Cities Index.
Agenda packet

Santa Cruz City Council
March 11, 2025

Document
Agenda packet
Meeting
March 11, 2025
Body
Santa Cruz City Council
Pages
151
Original file
209.1 MB
Text extracted from the city's file for reading and search. Open the original on ecm.cityofsantacruz.com. That file is the official record.

CITY COUNCIL AGENDA
Regular Meeting - March 11, 2025
Updated March 10, 2025 – Items 13 and 21
10:30 A.M. CLOSED SESSION, ZOOM/COURTYARD CONFERENCE ROOM 11:15 A.M. ORAL COMMUNICATIONS, CONSENT, CONSENT PUBLIC HEARINGS,

GENERAL BUSINESS AND PUBLIC HEARINGS, ZOOM/COUNCIL CHAMBERS The meeting may be viewed remotely, using any of the following sources:
 Click on Zoom link (no time delay): https://zoom.us/j/94684401344  Online at http://www.cityofsantacruz.com/government/city-council/council-meetings  Online at Watch – Community Television of Santa Cruz County  Comcast Channel 25
Or: Call any of the numbers below. If one is busy, try the next one.  1-833-548-0276 (Toll Free)
 1-833-548-0282 (Toll Free)
 1-877-853-5247 (Toll Free)
 1-669-900-9128
 Enter the meeting ID number: 946 8440 1344
 When prompted for a Participant ID, press #.
 Press *9 on your phone to “raise your hand” when the Mayor calls for public comment.  It will be your turn to speak when the Mayor calls on you. Press *6 to unmute yourself. The timer will then be set.

Correspondence to be included in the agenda packet must be received by 5:00 pm on Monday, March 10th
PLEASE NOTE:
 Council may take a break(s) as needed.
 Requests for extra speaking time on items other than Oral Communications must be made by 5:00 p.m. on Sunday, March 9th by emailing the Mayor and the City Clerk.

Approval will be confirmed via email.
[email protected] [email protected]
March 11, 2025 City Council 2
The City of Santa Cruz does not discriminate against persons with disabilities. Out of consideration for people with chemical sensitivities we ask that you attend fragrance free. Upon request, the agenda can be provided in a format to accommodate special needs. Additionally, if you wish to attend this public meeting and will require assistance such as an interpreter for American Sign Language, Spanish, or other special equipment, please call the City Clerk’s Department at 420-5030 at least five days in advance so that we can arrange for such special assistance, or email [email protected]. The CalRelay system number: 1-800-735-2922.

Si desea asistir a esta reunión pública y necesita ayuda - como un intérprete de lenguaje de señas americano, español u otro equipo especial - favor de llamar al Departamento de la Secretaría de la Ciudad al 420-5030 al menos cinco días antes para que podamos coordinar dicha asistencia especial o envié un correo electrónico a [email protected]. El número del sistema Cal-Relay es: 1-800-735-2922.

Agenda and Agenda Packet Materials: The City Council agenda and the complete agenda packet containing public records, which are not exempt from disclosure pursuant to the California Public Records Act, are available for review on the City’s website:
www.cityofsantacruz.com/government/city-council-meetings and at the Office of the City Clerk located at 809 Center Street, Room 8, Santa Cruz, California, during normal business hours.

Agenda Materials Submitted after Publication of the Agenda Packet: Pursuant to Government Code §54957.5, public records related to an open session agenda item submitted after distribution of the agenda packet are available at the same time they are distributed or made available to the legislative body on the City’s website at: www.cityofsantacruz.com/government/city-councilmeetings and are also available for public inspection at the Office of the City Clerk, 809 Center Street Room 8, Santa Cruz, California, during normal business hours, and at the Council meeting.

Need more information? Contact the City Clerk’s office at 831-420-5030.

Closed Session
10:30 AM
Statements of Disqualification

1. Conference with Legal Counsel - Existing Litigation (Government Code §54956.9(d)(1))
GVC St. George, LLC v. City of Santa Cruz
(United States District Court Case No.CV-07695-BLF)

2. Public Employee Performance Evaluation (Government Code §54957) City Attorney
March 11, 2025 City Council 3
City Council
11:15 AM
Call to Order
Roll Call
Oral Communications Announcement – Members of the public may address Council on matters not on the agenda, but within the jurisdiction of the Council. 30 minutes is allocated for Oral Communications. No extra time for groups will be granted.

Oral Communications
Presentation

3. Mayoral Proclamation Declaring April 2025 as Sexual Assault Awareness Month
Presiding Officer's Announcements
Statements of Disqualification
Additions and Deletions
City Attorney Report on Closed Session
Council Meeting Calendar

4. The City Council will review the meeting calendar attached to the agenda and revise it as necessary.

March 11, 2025 City Council 4
Consent Agenda

5. Resolution Extending the Emergency Declaration in Connection with the December 2024 Municipal Wharf Emergency (CA/CM)
LOCATION: District 4
Motion to adopt a resolution extending by sixty days the Local Emergency Declaration in connection with the December 2024 Municipal Wharf emergency.

6. Minutes of the February 25, 2025 City Council Meeting (CC) LOCATION: None
Motion to approve as submitted.

7. Award Contract for National Oceanic and Atmospheric Administration (NOAA) Grant Administration Services for Coastal Restoration Projects (CM)
LOCATION: Districts 1, 2, and 4
Motion to:
1) Award a contract for professional grant administrative services to support the coastal restoration projects funded by a NOAA Coastal Resilience Regional Challenge Grant (Grant) to The Ferguson Group (TFG) in the amount of $799,500, reject all other proposals; and 2) Authorize the City Manager to execute a contract, in a form approved by the City Attorney, with TFG. The Purchasing Manager is authorized to execute change orders within the approved budget.

8. 2025 Legislative Program (CM)
LOCATION: Citywide
Motion to adopt the 2025 Legislative Program.

March 11, 2025 City Council 5
Consent Agenda (continued)

9. 2024 Citywide Sewer/Storm Drain Lining Project (c401511) – Notice of Completion (PW)
LOCATION: Citywide
Motion to accept the work of Insituform Technologies, LLC. (Chesterfield, MO) as completed per plans and specifications, authorize the filing of the Notice of Completion for the 2024 Citywide Sewer/Storm Drain Lining Project (c401511), and authorize the Public Works Director to sign the Notice of Completion as the Owner’s Authorized Agent.

10. City of Santa Cruz Resource Recovery Facility Appliance Recycler Services – Award of Contract (PW)
LOCATION: District 6
Motion to award the Appliance Recycler Services contract to Campos Bros. Recovery, Inc. (West Sacramento, CA). The City Manager is hereby authorized and directed to execute the contract in a form approved by the City Attorney, as authorized by Resolution No. NS27,563. The Public Works Director is authorized to execute change orders within the approved project budget.

11. Active Transportation Plan (c402408) - Outreach Consulting Contract Amendment 1 (PW)
LOCATION: Citywide
Motion to approve Contract Amendment 1 with Ecology Action (Santa Cruz, CA) reducing the original contract to $53,186 for outreach consulting for the Active Transportation Plan Update and authorize the City Manager to execute the contract amendment in a form approved by the City Attorney. The Public Works Director is authorized to execute future contract amendments within the approved project budget.

March 11, 2025 City Council 6
Consent Agenda (continued)

12. Monterey Bay Sanctuary Scenic Trail (Rail Trail) Segment 7 Phase II Project (c401413) – Budget Adjustment (PW)
LOCATION: Districts 3 and 4
Motion to adopt a resolution amending the FY 2025 budget to appropriate funds in the amount of $900,000 from Measure D to the Monterey Bay Sanctuary Scenic Trail (Rail Trail) Segment 7 Phase 2 (c401413).

The below item is deleted from the agenda and will not be discussed.

13. Measure E Oversight Committee (PW)
LOCATION: Citywide
Motion authorizing the Mayor to appoint Water Commissioner Julianne Rhodes, and Transportation and Public Works Commissioners Susan Gilchrist and Ron Goodman to serve on the Measure E Oversight Committee.

14. Resource Recovery Facility Enclosed Flare Installation Project (c402512) – Authorization to Ratify Purchase Order (PW)
LOCATION: District 6
Motion to ratify purchase order for the direct purchase of the enclosed flare, related equipment, shipping and startup with Perennial Energy LLC (West Plains, MO) at the Resource Recovery Facility in the amount of $1,023,314.01, in a form approved by the City Attorney. The Public Works Director is authorized to execute change orders within the approved project budget.

15. West Cliff Drive Bethany Curve Culvert Project (c402407) - Authorization to Ratify Purchase Order (PW)
LOCATION: District 6
Motion to ratify purchase order for additional work as outlined in the latest proposal from Pacific Crest Engineering (PCE) dated November 2024 for the West Cliff Drive Bethany Curve Culvert Project (c402407) and authorize the City Manager to execute the contract amendment in a form approved by the City Attorney. The Public Works Director is authorized to execute change orders within the approved project budget.

March 11, 2025 City Council 7
Consent Agenda (continued)

16. Modifications to City Council Forest Management Policies for Water Department Watershed Lands (WT)
LOCATION: Citywide
Motion to repeal City Council Policy 11.3 - Timber Harvests in Watershed Area and Preservation of Old Growth Trees, and replace with City Council Policy 11.3 – Forest Management of Water Department Watershed Lands, which includes a) additional old growth tree characteristics that will facilitate their protection and b) the ability to commercialize forest products in alignment with c) the requirement to reinvest revenue from such commercialization into other Water Department watershed restoration work.

End Consent Agenda
Consent Public Hearings

17. 2nd Reading and Final Adoption of Ordinance No. 2025-03 Amending Santa Cruz Municipal Code Chapter 9.36 (“Noise”) and Chapter 9.40 (“Sound Amplifying Equipment”) and Adding Objective Standards to Both Chapters (CN)
LOCATION: Citywide
Motion to adopt Ordinance No. 2025-03 amending Santa Cruz Municipal Code Chapter 9.36 (“Noise”) and Chapter 9.40 (“Sound Amplifying Equipment”) and adding objective standards to both chapters.

18. 2nd Reading and Final Adoption of Ordinance No. 2025-04 Minor Modifications to the Previously-Adopted Amendments to Chapter 18.15 of the Municipal Code Requiring Additional Energy Standards for Alterations and Additions to Existing Single Family Homes (CM/PL) LOCATION: Citywide
Motion to adopt Ordinance No. 2025-04 making minor changes to the previously-adopted Municipal Code Chapter 18.15 which adopted local amendments to Title 24, Part 6 of the California Code of Regulations (California Energy Code). Council finds the amendments are consistent with the Negative Declaration approved for the City of Santa Cruz 2030 Climate Action Plan adopted by City Council on September 13, 2022.

The ordinance is also exempt under exempt from CEQA under the general rule, 15061(b)(3) and per CEQA Guidelines Section 15308, Class 8, Actions by Regulatory Agencies for Protection of Natural Resources.

March 11, 2025 City Council 8
Consent Public Hearings (continued)

19. 2nd Reading and Final Adoption of Ordinance No. 2025-05 Childcare Impact Fee Updates (PL)
LOCATION: Citywide
Motion to adopt Ordinance No. 2025-05 amending City of Santa Cruz Municipal Code Chapter 18.48 “Childcare Impact Fees,” modifying Section 18.48.050 Exemptions.

20. Sidewalk Vending Ordinance Administrative Amendments. Applicant:

City of Santa Cruz. CEQA: Exempt per 15061(b)(3). (PL)
LOCATION: Citywide
Motion to introduce for publication an ordinance acknowledging the California Environmental Quality Act (CEQA) exemption and amending Santa Cruz Municipal Code (SCMC) Chapter 5.82 (“Sidewalk Vending”) to clarify the definition of an “Enforcement Official,” to specify the time period within which a vendor may receive citations before a permit may be revoked, to reduce the number of citations resulting in impoundment from four to three, to clarify and update restricted vending times and locations, and to provide clearer distinctions between roaming and stationary vending locations.

Public Hearings
The recommendation for the below item was corrected.

21. Public Safety Impact Fee Nexus Study and Proposed Fees Update (FD/PD)
LOCATION: Citywide
This item is continued to the March 25th April 22nd Council meeting and will not be discussed on March 11th.

March 11, 2025 City Council 9
Public Hearings (continued)

22. 313 Swift Street (Application No. CP24-0104) – Assessor’s Parcel Number 003-161-32 – Request for 1) Acknowledgement of the Environmental Determination and Adoption of a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (MMRP) Pursuant to Section 15074 of the California Environmental Quality Act (CEQA); and 2) Consideration of the Application for a Planned Development Permit, Coastal Permit, Design Permit, and Heritage Tree Removal Permit to Allow Construction of a New, Four-Story, Approximately 120,604 Square-Foot Multifamily Educator Workforce Housing Project Encompassing Approximately 100 Residential Units, Approximately 119 Parking Spaces, New Landscaping, and Associated Site Modifications, Including the Removal of Up to Six (6) Heritage Trees, on a Site Located in the P-F/CZ-O (Public Facilities/Coastal Zone Overlay) Zoning District, Based on the Findings and Conditions of Approval Listed In Exhibit “A.” (Environmental Review: Initial Study/Mitigated Negative Declaration). (Applicant/Filed: Santa Cruz City School District/June 27, 2024) (PL)
LOCATION: District 6
Motion to adopt a resolution acknowledging the environmental determination and adopting the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (MMRP), and approving the Planned Development Permit, Coastal Permit, Design Permit, and Heritage Tree Removal Permit to allow construction of a new, fourstory, approximately 120,604 square-foot multifamily educator workforce housing project encompassing approximately 100 residential units, approximately 119 parking spaces, new landscaping, and associated site modifications, including the removal of up to six (6) Heritage trees, on a site located in the P-F/CZ-O (Public Facilities/Coastal Zone Overlay) zone district, subject to the attached conditions of approval.

March 11, 2025 City Council 10
General Business

23. 2025-2030 City of Santa Cruz Local Hazard Mitigation Plan and Climate Adaptation Plan (CM)
LOCATION: Citywide
Motion to adopt a resolution approving and adopting the 2025-2030 City of Santa Cruz Local Hazard Mitigation Plan and Climate Adaptation Plan and directing and authorizing the appropriate City representatives to transmit a certified copy of this resolution to the Federal Emergency Management Agency.

24. Consideration of the Proposed 5-year Roadmap for West Cliff to Advance the Community’s 50-year Vision for West Cliff (CM/PW) LOCATION: Districts 3 and 6
Receive comments on and adopt the 5-year Roadmap for West Cliff.

Adjournment – The City Council will adjourn no later than 3:30 p.m.

March 11, 2025 City Council 11

INFORMATION ITEMS PREVIOUSLY DISTRIBUTED TO CITY COUNCILMEMBERS ADDENDUM TO CITY COUNCIL AGENDA – MARCH 11, 2025

25. Economic Development and Housing Department: 333 Locust – Unit Vacancies - 2/12/25 (EDHFYI 001)

MAYOR'S PROCLAMATIONS
None issued.

Advisory Body Appointments
The following positions are either currently vacant or the terms are due to expire. Council will make appointments at a future meeting.

Board of Building and Fire
Appeals
One opening – 4-year term, at-large nomination.

County Housing Authority Board One opening – 4-year term, at-large nomination.

County Latino Affairs Commission One opening – 4-year term, at-large nomination.

Historic Preservation Commission Two openings – One 4-year term to be appointed by Vice Mayor Kalantari-Johnson, and one 2-year term to
be appointed by Mayor Keeley.

March 11, 2025 City Council 12
Public Hearing
If, in the future, you wish to challenge in court any of the matters on this agenda for which a public hearing is to be conducted, you may be limited to raising only those issues which you (or someone else) raised orally at the public hearing or in written correspondence received by the City at or before the hearing.

Any person seeking to challenge a City Council decision made as a result of a proceeding in which, by law, a hearing is required to be given, evidence is required to be taken, and the discretion in the determination of facts is vested in the City Council, shall be required to commence that action either 60 days or 90 days following the date on which the decision becomes final as provided in Code of Civil Procedure Section 1094.6 Please refer to code of Civil Procedure 1094.6 to determine how to calculate when a decision becomes “final.” The 60-day rule applies to all public hearings conducted pursuant to the City’s Zoning Ordinance, Title 24, Santa Cruz Municipal Code. The 90-day rule applies to all other public hearings.

Meeting Type
Holiday
Jewish Holiday
Regular Meeting
Special Meeting (will be added as scheduled)
Study Session (will be added as scheduled)
Budget Hearing
DATE Location Meeting Type
Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public April 12/13
Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public May 26
Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public June 19
Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public July 4
Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public September 1
Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public September 22/23
Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public October 1/2
Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public November 11
Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public November 27
November 28
Courtyard Conf. Room Closed Session - Closed to the Public Council Chambers Council Regular Meeting - Open to the Public December 14/15
December 25
City Council Meeting Calendar for 2025
December 9
City Hall Closure - Thanksgiving Day
City Hall Closure - Day After Thanksgiving Day
June 24
September 9
September 30
City Hall Closure - Juneteenth
Passover (City observed - sundown to sundown)
August 12
March 25
May 13
April 22
June 10
May 27
City Hall Closure - Labor Day
August 26
July 8 and 22 Meetings Cancelled
City Hall Closure - Independence Day
City Hall Closure - Memorial Day
December 23 Meeting Cancelled
City Hall Closure - Christmas Day
Rosh Hashanah (City observed - sundown to sundown)
October 14
October 28
City Hall Closure - Veteran's Day (observed)
Hanukkah (City observed - sundown to sundown)
Yom Kippur (City observed - sundown to sundown)
November 18

4.1 City Council

AGENDA REPORT
DATE: 02/18/2025
AGENDA OF: 03/11/2025
DEPARTMENT: City Attorney
SUBJECT: Resolution Extending the Emergency Declaration in Connection with the December 2024 Municipal Wharf Emergency (CA/CM)
LOCATION: District 4
RECOMMENDATION: Motion to adopt a resolution extending by sixty days the Local Emergency Declaration in connection with the December 2024 Municipal Wharf emergency.

BACKGROUND: On December 23, 2024, at approximately 12:45 p.m., the City experienced a high surf event causing approximately 150 feet of a section of the Santa Cruz Municipal Wharf to collapse into the ocean. Damage to the Wharf is extensive and has resulted in significant cleanup efforts. Out of concerns for public safety around this unprecedented event, the City closed the Wharf, Cowell Beach, and Main Beach and multiple small businesses were impacted.

On December 24, 2024, the City Manager issued a “Proclamation of Existence of Local Emergency.” The City Manager re-issued the Proclamation of Existence of Local Emergency on December 31, 2024, and January 7, 2025.

DISCUSSION: Government Code section 8630 authorizes a governing body of a city or an official designated by ordinance to proclaim the existence of a local emergency. Santa Cruz Municipal Code section 2.20.030 empowers the Director of Emergency Services to proclaim the existence or threatened existence of a local emergency when the City is affected or likely to be affected by a public calamity or disaster, subject to confirmation by the City Council at the “earliest practicable time.” During the existence of such emergency, the Director of Emergency Services is also authorized, pursuant to Section 2.20.040(1), to “[m]ake and issue rules and regulations on matters reasonably related to the protection of life and property as affected by such emergency,” also subject to confirmation by the City Council “at the earliest practicable time.”
In view of the facts and circumstances described above, the City Manager declared the existence of a local emergency in the City of Santa Cruz on December 24, 2024, and declared the continued existence of a local emergency on December 31, 2024, and January 7, 2025. The City Council ratified the emergency declaration by Resolution No. NS-30,423 at its January 14, 2025 regular meeting.

5.1 The attached resolution, if adopted by the City Council, would extend the emergency declaration related to the December 2024 Wharf emergency by an additional 60 days, to May 10, 2025.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: The proposed Council action is not a “project” under CEQA. “Project” is defined by CEQA as:
“an activity which may cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and which is any of the following:
(a) An activity directly undertaken by any public agency. (b) An activity undertaken by a person which is supported, in whole or in part, through contracts, grants, subsidies, loans, or other forms of assistance from one or more public agencies. (c) An activity that involves the issuance to a person of a lease, permit, license, certificate, or other entitlement for use by one or more public agencies.” (Pub. Resources Code, § 21065.) The proposed resolution is not a “project” under CEQA because it does not have the potential to cause a physical change in the environment directly or indirectly. Any action taken to repair the Wharf or mitigate damages, if considered a “project” under CEQA, would be exempt as an emergency project pursuant to California Code of Regulations, Title 14, Division 6, Chapter 3, Article 18, Section 15269.

HEALTH IN ALL POLICIES (HiAP): This action is consistent with the three pillars of HiAP.

Specifically, the action has a nexus with public health in that the resolution is intended to aid the City in clean up and recovery efforts to protect the public health and safety along the Wharf and City beaches.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: Actions taken by the City during a declared emergency are potentially recoverable from Cal OES (California Governor’s Office of Emergency Services) and FEMA (Federal Emergency Management Agency).

Prepared By:

Kaylen Anderson
Law Fellow
Submitted By:

Tony Condotti
City Attorney
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. RESOLUTION.DOCX

5.2 RESOLUTION NO. NS-XX,XXX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CRUZ EXTENDING

THE LOCAL EMERGENCY DECLARATION IN CONNECTION WITH THE DECEMBER 2024 WHARF EMERGENCY
WHEREAS, Government Code section 8630 authorizes the City Council or an official designated by ordinance to proclaim the existence of a local emergency; and WHEREAS, Santa Cruz Municipal Code section 2.20.030 empowers the City Manager, as the director of emergency services, to proclaim the existence or threatened existence of a local emergency when the City is affected or likely to be affected by a public calamity, subject to confirmation by the City Council at the earliest practicable time; and WHEREAS, on December 23, 2024, at approximately 12:45 p.m., the City of Santa Cruz (“City”) experienced a high surf event causing approximately 150 feet of a section of the Santa Cruz Municipal Wharf (the “Wharf”) to collapse into the ocean; and WHEREAS, debris from the Wharf remains in the ocean and poses a potential threat to the shoreline and vessels on the water; and
WHEREAS, the City temporarily closed the remaining portions of the Wharf, Cowell Beach, and Main Beach to ensure the safety of the public. The Wharf remained closed for nearly two weeks, significantly impacting small businesses; and WHEREAS, damage to the Wharf is significant and is estimated at over $18 million and as a result, the City’s emergency response to the December 2024 Wharf Emergency is ongoing as City staff continues to assess the damage to the Wharf and impact of the debris from the Wharf; and
WHEREAS, as a result of the incident at the Wharf, the City Manager, as the director of emergency services, declared the existence of a local emergency on December 24, 2024, and declared the continued existence of a local emergency on December 31, 2024, and January 7, 2025; and
WHEREAS, at its January 14, 2025 meeting, the City Council adopted Resolution No. NS30,423 declaring the existence of a State of Emergency in connection with the December 2024 Wharf Emergency, confirming the December 24, 2024, December 31, 2024, and January 7, 2025 Emergency Proclamations by the City Manager, as the director of emergency services; and WHEREAS, on February 14, 2025, Gavin Newsom, Governor of the State of California, proclaimed the existence of a state of emergency in the County of Santa Cruz due to the December 2024 winter storm that resulted in damage to the Wharf, further highlighting the significant impact of the storm and resulting damage.

5.3 RESOLUTION NO. NS-XX,XXX
2 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Santa Cruz (City Council) as follows:

A. That the City Council hereby declares that the local emergency declaration adopted at its January 14, 2025 regular meeting by Resolution No. NS-30,423, shall be extended an additional sixty (60) days from its adoption pursuant to California Government Code Section 8630, et seq., by this Resolution; and B. This Resolution shall remain in full force and effect and shall thereafter terminate on the sixtieth (60th) day after its adoption, unless earlier terminated or further extended by subsequent City Council action.

PASSED AND ADOPTED this 11th day of March 2025 by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

APPROVED: __________________________
Fred Keeley, Mayor
ATTEST: ___________________________
Bonnie Bush, City Clerk Administrator

5.4 MINUTES ARE UNOFFICIAL UNTIL APPROVED BY COUNCIL
City of Santa Cruz
809 Center Street
Santa Cruz, California 95060

MINUTES OF A CITY COUNCIL MEETING
February 25, 2025
12:30 PM
Mayor Keeley opened the City Council Closed Session at 12:30 p.m. in a public meeting via Zoom and in Council Chambers, for the purpose of announcing the agenda, and receiving public testimony.

Roll Call

Present: Councilmembers Trigueiro, Brunner, Newsome, Golder, O’Hara; Vice Mayor Kalantari-Johnson; Mayor Keeley.

Absent: None.

Staff: City Manager M. Huffaker, City Attorney T. Condotti, Director of Information Technology K. Morgan (via Zoom), Deputy City Clerk Administrator J. Wood.

Statements of Disqualification – None.

Statements of Disqualification – None.

Public Comment
Mayor Keeley opened the public comment period at 12:32 p.m. There were no speakers. Mayor Keeley closed the public comment period at 12:32 p.m., at which time the meeting was closed to the public and Council adjourned to the Courtyard Conference Room.

6.1 February 25, 2025 CITY COUNCIL MINUTES 7830
Closed Session

1. Conference with Legal Counsel – Liability Claims (Government Code §54956.95) Claimant: Garrison Property and Casualty Insurance
Claim against the City of Santa Cruz
Council received a status report, took up under agenda item 9, and no reportable action was taken.

2. Conference with Labor Negotiators (Government Code §54957.6) SEIU Temporary Employees
SEIU Service Employees
Mid Managers, OE3
Supervisors, OE3
Fire Management
Fire, IAFF
Police Management
Police Officers Association
Executives
City Negotiator - Sara De Leon
Council received a status report from the City Negotiator, and no reportable action was taken.

3. Conference with Legal Counsel - Existing Litigation (Government Code §54956.9(d)(1))
GVC St. George, LLC v. City of Santa Cruz
(United States District Court Case No.CV-07695-BLF)
Council received a status report, and took no reportable action was taken.

6.2 February 25, 2025 CITY COUNCIL MINUTES 7831
City of Santa Cruz
809 Center Street
Santa Cruz, California 95060

MINUTES OF A CITY COUNCIL MEETING
February 25, 2025
1:30 PM
Call to Order – Mayor Keeley called the meeting to order at 1:30 p.m. in Council Chambers.

Roll Call

Present: Councilmembers Trigueiro, Brunner, Newsome, Golder, O’Hara; Vice Mayor Kalantari-Johnson; Mayor Keeley.

Absent: None.

Staff: City Manager M. Huffaker, Assistant City Manager M. Templeton (via Zoom), City Attorney T. Condotti, Chief of Fire R. Oatey, Director of Economic Development and Housing B. Lipscomb (via Zoom), Director of Information Technology K. Morgan (via Zoom), Director of Water H.

Luckenbach (via Zoom), Chief of Police B. Escalante (via Zoom), Director of Planning and Community Development L. Butler, Principal Management Analyst V. Pearson, Development Manager B. Borguno, Records Coordinator B. Inclan, Deputy City Clerk Administrator J. Wood.

Oral Communications Announcement - The Mayor provided a brief announcement about Oral Communications.

Oral Communications
At 1:31 p.m. Mayor Keeley opened Oral Communications for members of the public who wished to speak regarding items not listed on the City Council agenda.

James Ewing Whitman spoke regarding the Board of Supervisors’ meeting.

Gary Cole spoke regarding various cities that created greenbelts and community spaces.

At 1:37 p.m. Mayor Keeley closed Oral Communications.

6.3 February 25, 2025 CITY COUNCIL MINUTES 7832
Presentations

4. Parking for Hope Check Presentation
Vice Mayor Kalantari-Johnson spoke and presented a check on behalf of the City to the Downtown Association’s Parking for Hope Program. Program Manager Heather Perez spoke.

Presiding Officer's Announcements
Statements of Disqualification – None.

Additions and Deletions – Deputy City Clerk Administrator J. Wood announced items 14 and 16 have been continued to the March 11, 2025 City Council meeting, and item 17 has been continued to a future meeting.

City Attorney Report on Closed Session – See page 7830 for the report.

Council Meeting Calendar

5. The City Council reviewed and did not revise the meeting calendar attached to the agenda.

Consent Agenda
Mayor Keeley opened the public comment period. The following person spoke:

James Ewing-Whitman made a comment on item 6.

Mayor Keeley closed the public comment period.

MOTION: Councilmember Golder moved, seconded by Councilmember Brunner, to approve the Consent Agenda.

ACTION: The motion carried unanimously with the following vote.

AYES: Councilmembers Trigueiro, Brunner, Newsome, Golder, O’Hara; Vice Mayor Kalantari-Johnson; Mayor Keeley.

NOES: None.

ABSENT: None.

DISQUALIFIED: None.

6. Minutes of the February 11, 2025 City Council Meeting (CC) LOCATION: None
Motion carried to approve as submitted.

6.4 February 25, 2025 CITY COUNCIL MINUTES 7833
Consent Agenda (continued)

7. City Council Nomination of Rachel Dann to the County of Santa Cruz's Measure Q Safe Drinking Water, Clean Beaches, Wildfire Risk Reduction, and Wildlife Protection Act (WWWPA) Citizen's Oversight Advisory Board (CC) LOCATION: Countywide
Motion carried to nominate Rachel Dann for appointment to the County of Santa Cruz's Measure Q Safe Drinking Water, Clean Beaches, Wildfire Risk Reduction, and Wildlife Protection Act (WWWPA) Citizen's Oversight Advisory Board.

8. Resolution Establishing the 2025 Security Deposit Interest Rate for Residential Rental Property (EDH)
LOCATION: Citywide
Resolution No. NS-30,444 was adopted establishing the 2025 interest rate for the residential security deposits at 0.01% and rescinding Resolution No. NS30,287.

9. Liability Claim Filed Against the City of Santa Cruz (FN) Motion carried to return as late claim 1) Garrison Property and Casualty Insurance, based on staff recommendation.

10. Department of Toxic Substances Control (DTSC) Equitable Communities Revitalization Grant for Soils Investigation and Remedial Action Planning in the Lower Main Meadow, Pogonip Open Space – Third Amendment to Agreement for Environmental Consulting Services (PR)
LOCATION: District 5
Motion carried to approve and authorize the City Manager to execute an amendment to the Professional Services Agreement with Remediation Risk Management, Inc. for environmental consulting services to investigate and plan for the remediation of soil contamination in the Lower Main Meadow, Pogonip Open Space, in a form approved by the City Attorney. The Director of Parks and Recreation is authorized to execute contract amendments within the approved project budget.

End Consent Agenda

6.5 February 25, 2025 CITY COUNCIL MINUTES 7834
Consent Public Hearing
Councilmember O’Hara pulled item 12 for further discussion.

Mayor Keeley opened the public comment period. The following people spoke:

Rachel Sotos made a comment on item 12.

Garrett made a comment on item 11.

James Ewing-Whitman made a comment on item 13.

Mayor Keeley closed the public comment period.

MOTION: Vice Mayor Kalantari-Johnson moved, seconded by Councilmember Trigueiro, to approve the remaining Consent Public Hearing Agenda.

ACTION: The motion carried unanimously with the following vote.

AYES: Councilmembers Trigueiro, Brunner, Newsome, Golder, O’Hara; Vice Mayor Kalantari-Johnson; Mayor Keeley.

NOES: None.

ABSENT: None.

DISQUALIFIED: None.

11. 2nd Reading and Final Adoption of Ordinance No. 2025-02 Related to the Parking Lease Revenue Bond Authorization (FN/EDH/PW)
LOCATION: District 4
Motion carried to adopt Ordinance No. 2025-02 amending and restating Chapter

16.26 of the Municipal Code to permit the issuance of Parking Revenue Bonds by the City.

6.6 February 25, 2025 CITY COUNCIL MINUTES 7835
Consent Public Hearings (continued)

12. 2nd Reading and Final Adoption of Ordinance No. 2025-03 Amending Santa Cruz Municipal Code Chapter 9.36 (“Noise”) and Chapter 9.40 (“Sound Amplifying Equipment”) and Adding Objective Standards to Both Chapters (CN) LOCATION: Citywide
Councilmember O’Hara gave a presentation.

Mayor Keeley opened the public comment period. The following people spoke.

James Ewing-Whitman
Curtis Reliford
Greg Benson
Mayor Keeley closed the public comment period.

MOTION: Councilmember O’Hara moved, seconded by Vice Mayor Kalantari-Johnson, to:
 Direct staff to return to City Council within two months with an updated noise ordinance that meets the following objectives:
 Expands the ordinance to all commercial zones throughout the City.  Uses California Department of Public Health guidelines to limit noise impacting public health.
 Uses decibel measurement criteria instead of distance-based rules.  Ensures the ordinance only regulates noise harmful to public health.  Provides clear enforcement guidelines to Council.
 Engage with interested community members on permitting options to continue current public expression activities.

6.7 February 25, 2025 CITY COUNCIL MINUTES 7836
Consent Public Hearings (continued)

12. 2nd Reading and Final Adoption of Ordinance No. 2025-03 Amending Santa Cruz Municipal Code Chapter 9.36 (“Noise”) and Chapter 9.40 (“Sound Amplifying Equipment”) and Adding Objective Standards to Both Chapters (CN) LOCATION:

Citywide (continued)
ACTION: The motion failed with the following vote.

AYES: Councilmembers Golder, O’Hara; Vice Mayor KalantariJohnson.

NOES: Councilmembers Trigueiro, Brunner, Newsome; Mayor Keeley.

ABSENT: None.

DISQUALIFIED: None.

MOTION: Councilmember Newsome moved, seconded by Councilmember Brunner, to re-introduce for publication Ordinance No. 2025-03 amending Santa Cruz Municipal Code Chapter 9.36 (“Noise”) and Chapter 9.40 (“Sound Amplifying Equipment”) and adding objective standards to both chapters with the following amendments:

Section 9.36.020(C):

From:
“If the noise producing source is on public property in a commercial zone (as defined below), amplified noise and/or repetitive banging or percussive noises that can be heard 75 or more feet from the noise-producing source are presumptively unreasonably loud or disturbing as prohibited by this section. This presumption, however, shall not apply to permitted amplification or percussion used in special events or performances permitted by the City under a different part of the Municipal Code (e.g., Public Gathering and Expression Events (Chapter 10.65) and Major Public Special Events (Chapter 10.64)).”
To:
“If the noise producing source is on public property in a commercial zone (as defined below), amplified noise and/or repetitive banging or percussive noises that can be heard 125 or more feet from the noise-producing source are presumptively unreasonably loud or disturbing as prohibited by this section. This presumption, however, shall not apply to permitted amplification or percussion used in special events or performances permitted by the City under a different part of the Municipal Code (e.g., Public Gathering and Expression Events (Chapter 10.65) and Major Public Special Events (Chapter 10.64)).”

6.8 February 25, 2025 CITY COUNCIL MINUTES 7837
Consent Public Hearings (continued)

12. 2nd Reading and Final Adoption of Ordinance No. 2025-03 Amending Santa Cruz Municipal Code Chapter 9.36 (“Noise”) and Chapter 9.40 (“Sound Amplifying Equipment”) and Adding Objective Standards to Both Chapters (CN) LOCATION:

Citywide (continued)
MOTION (continued):

Section 9.40.010(B)(3):

From:
“Shall be operated at a volume of sound that is not be unreasonably loud, raucous, jarring, disturbing or a nuisance to reasonable persons of normal sensitiveness within the range of audibility, considering the factors set forth in Section 9.36.020(B). If the noise producing source is on public property in a commercial zone (as defined by SCMC §9.36.020(C)(1)), amplified noise that can be heard 75 or more feet from the noise-producing source is presumptively unreasonably loud or disturbing as prohibited by this subsection. This presumption, however, shall not apply to permitted amplification used in special events or performances permitted by the City under a different part of the Municipal Code (e.g., Public Gathering and Expression Events (Chapter 10.65), Major Public Special Events (Chapter

10.64))”
To:
“Shall be operated at a volume of sound that is not be unreasonably loud, raucous, jarring, disturbing or a nuisance to reasonable persons of normal sensitiveness within the range of audibility, considering the factors set forth in Section 9.36.020(B). If the noise producing source is on public property in a commercial zone (as defined by SCMC §9.36.020(C)(1)), amplified noise that can be heard 125 or more feet from the noise-producing source is presumptively unreasonably loud or disturbing as prohibited by this subsection. This presumption, however, shall not apply to permitted amplification used in special events or performances permitted by the City under a different part of the Municipal Code (e.g., Public Gathering and Expression Events (Chapter 10.65), Major Public Special Events (Chapter

10.64));”
FRIENDLY AMENDMENT: Councilmember Golder requested to expand to all commercial zones and direct staff to return in 6 months with data.

Councilmember Newsome did not accept.

6.9 February 25, 2025 CITY COUNCIL MINUTES 7838
Consent Public Hearings (continued)

12. 2nd Reading and Final Adoption of Ordinance No. 2025-03 Amending Santa Cruz Municipal Code Chapter 9.36 (“Noise”) and Chapter 9.40 (“Sound Amplifying Equipment”) and Adding Objective Standards to Both Chapters (CN) LOCATION:

Citywide (continued)
ACTION: The motion carried with the following vote.

AYES: Councilmembers Brunner, Newsome, Golder; Mayor Keeley.

NOES: Councilmembers Trigueiro, O’Hara; Vice Mayor KalantariJohnson.

ABSENT: None.

DISQUALIFIED: None.

13. Minor Modifications to the Previously Adopted Amendments to Chapter 18.15 of the Municipal Code Requiring Additional Energy Standards for Alterations and Additions to Existing Single-Family Homes (CM/PL)
LOCATION: Citywide
Motion carried to introduce for publication Ordinance No. 2025-04 making minor changes to the previously adopted Municipal Code Chapter 18.15 which adopted local amendments to Title 24, Part 6 of the California Code of Regulations (California Energy Code). Council finds the amendments are consistent with the Negative Declaration approved for the City of Santa Cruz 2030 Climate Action Plan adopted by City Council on September 13, 2022. The ordinance is also exempt from CEQA under the general rule, 15061(b)(3) and per CEQA Guidelines Section 15308, Class 8, Actions by Regulatory Agencies for Protection of Natural Resources.

Public Hearings

14. Public Safety Impact Fee Nexus Study and Proposed Fees Update (FD/PD) LOCATION: Citywide
This item was continued to the March 11, 2025 Council meeting and was not discussed.

6.10 February 25, 2025 CITY COUNCIL MINUTES 7839
Public Hearings

15. Childcare Impact Fee Updates (PL)
LOCATION: Citywide
Principal Management Analyst V. Pearson gave a presentation and responded to Council questions.

Mayor Keeley opened the public comment period. The following person spoke.

Unidentified person
Mayor Keeley closed the public comment period.

Director of Planning and Community Development L. Butler responded to Council questions.

MOTION: Councilmember Golder moved, seconded by Vice Mayor Kalantari-Johnson, to:
 Introduce for publication Ordinance No. 2025-05 amending City of Santa Cruz Municipal Code Chapter 18.48 “Childcare Impact Fees,” modifying Section 18.48.050 Exemptions; and
 Adopt Resolution No. NS-30,445 updating the Childcare Impact Fees for residential and non-residential development and rescinding Resolution No.

NS-29,812.

ACTION: The motion carried unanimously with the following vote.

AYES: Councilmembers Trigueiro, Brunner, Newsome, Golder, O’Hara; Vice Mayor Kalantari-Johnson; Mayor Keeley.

NOES: None.

ABSENT: None.

DISQUALIFIED: None.

6.11 February 25, 2025 CITY COUNCIL MINUTES 7840
Public Hearings (continued)

16. 313 Swift Street (Application No. CP24-0104) – Assessor’s Parcel Number 003- 161-32 – Request for 1) Acknowledgement of the Environmental Determination and Adoption of a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (MMRP) Pursuant to Section 15074 of the California Environmental Quality Act (CEQA); and 2) Consideration of the Application for a Planned Development Permit, Coastal Permit, Design Permit, and Heritage Tree Removal Permit to Allow Construction of a New, Four-Story, Approximately 120,604 Square-Foot Multifamily Educator Workforce Housing Project Encompassing Approximately 100 Residential Units, Approximately 119 Parking Spaces, New Landscaping, and Associated Site Modifications, Including the Removal of Up to Six (6) Heritage Trees, on a Site Located in the P-F/CZO (Public Facilities/Coastal Zone Overlay) Zoning District, Based on the Findings and Conditions of Approval Listed In Exhibit “A.” (Environmental Review: Initial Study/Mitigated Negative Declaration). (Applicant/Filed: Santa Cruz City School District/June 27, 2024) (PL)
LOCATION: District 6
This item was continued to the March 11, 2025 Council meeting and was not discussed.

General Business

17. Ordinance Amending Chapter 21.07 of the Santa Cruz Municipal Code to Create a Process Guaranteeing a Fair Rate of Return to Landlords of Properties with Expiring Affordability Agreements (CA)
LOCATION: Citywide
This item was continued to a future meeting and was not discussed.

6.12 February 25, 2025 CITY COUNCIL MINUTES 7841
General Business

18. Resolution to Accept and Appropriate the Award from the State Affordable Housing Sustainable Communities (AHSC) Program for the Downtown Library and Affordable Housing Project (EDH)
LOCATION: District 4
Director of Economic Development and Housing B. Lipscomb introduced the item.

Development Manager B. Borguno gave a presentation.

Mayor Keeley opened the public comment period. The following people spoke.

Unidentified person
Sarah Beck
Jim Rendler
Casey Beyer
Mayor Keeley closed the public comment period.

MOTION: Councilmember Newsome moved, seconded by Councilmember O’Hara, to adopt Resolution No. NS-30,446 authorizing the City Manager, or the Economic Development and Housing Director, to accept, and appropriate grant funds from the California Strategic Growth Council (SGC), as awarded, through the Round 7 State Affordable Housing and Sustainable Communities Grant Program (AHSC); and, to negotiate, execute, enter into, and deliver any necessary contracts, agreements, documents, amendments, in a form to be approved by the City Attorney; and take any other actions necessary to implement the grant funded project, in an aggregate amount(s) not to exceed the grant award of $33,502,820.

ACTION: The motion carried unanimously with the following vote.

AYES: Councilmembers Trigueiro, Brunner, Newsome, Golder, O’Hara; Vice Mayor Kalantari-Johnson; Mayor Keeley.

NOES: None.

ABSENT: None.

DISQUALIFIED: None.

Adjournment – Councilmember Golder moved, seconded by Councilmember Trigueiro, to adjourn. By consensus City Council adjourned at 3:03 p.m.

6.13 February 25, 2025 CITY COUNCIL MINUTES 7842
Respectfully Submitted:

Julia Wood, Deputy City Clerk Administrator
Attest:

Bonnie Bush, City Clerk Administrator
Approved:

Fred Keeley, Mayor

6.14 City Council

AGENDA REPORT
DATE: 02/19/2025
AGENDA OF: 03/11/2025
DEPARTMENT: City Manager
SUBJECT: Award Contract for National Oceanic and Atmospheric Administration (NOAA) Grant Administration Services for Coastal Restoration Projects (CM)
LOCATION: Districts 1, 2, and 4
RECOMMENDATION: Motion to:
1) Award a contract for professional grant administrative services to support the coastal restoration projects funded by a NOAA Coastal Resilience Regional Challenge Grant (Grant) to The Ferguson Group (TFG) in the amount of $799,500, reject all other proposals; and 2) Authorize the City Manager to execute a contract, in a form approved by the City Attorney, with TFG. The Purchasing Manager is authorized to execute change orders within the approved budget.

BACKGROUND: In July 2024, California Marine Sanctuary Foundation (CMSF) was awarded nearly $71M in grant funds from National Oceanic and Atmospheric Administration (NOAA) through the Climate Resilience Regional Challenge. The City of Santa Cruz is a subawardee of these grant funds in the amount of $7,887,878. The funded projects will address challenges posed by extreme weather events and other climate change impacts, such as sea level rise, atmospheric rivers, and drought. The City will use its portion of the funding to support the planning, design, and construction of resiliency projects at three critical locations: the mouth of the San Lorenzo River on Main Beach, San Lorenzo Park, and Jessie Street Marsh. Grant administration services are needed to lend capacity to the City and support completion of all reporting requirements as well as develop systems to track progress on grant deliverables over the course of the grant term. Staff issued a competitive solicitation to select one qualified consultant to provide grant administration services to the City for the projects.

DISCUSSION: On December 13, 2025, staff issued a Request for Proposals (RFP) for Grant Administration Services for the Coastal Restoration Project. The RFP Scope of Services included set up of a shared file collaboration site, communication with staff, scheduling review meetings as necessary, collection of progress updates and expenditure reports, preparation of invoicing and backup documentation and preparing all reporting. This work will also include close coordination with the CMSF, and use of the tools and templates developed by the CMSF. The

7.1 RFP was posted on the City’s website to ensure that the RFP was conducted in an open and competitive manner and the City issued a solicitation notification to a bid list of 11,086 vendors the same day.

Proposals were due at 4:00 PM PST on January 8, 2025, and the City received proposals from six firms by that time. After being checked for responsiveness, all six firms’ proposals were evaluated by an evaluation committee consisting of subject matter experts in grant administration, coastal restoration, and resilience project construction. Proposals were evaluated for adherence to RFP requirements, firm background, firm qualifications, team qualifications, expertise and experience, work plan for providing grant administration, references, and cost.

Regional Water Management Foundation (RWMF) received a total score of 88.20 out of 100.

Staff initiated negotiations with RWMF on January 29, 2025. After a week of negotiations, RWMF withdrew their proposal on February 4. 2025. Staff then initiated negotiations with the next highest-ranked proposer, The Ferguson Group. The Ferguson Group received a total score of 81.94 out of 100. Attachment: Evaluation Tabulation includes the scores for all six firm proposals. Staff recommends awarding the contract to The Ferguson Group with an effective date of March 14, 2025. The grant administration services are needed as soon as possible, given grant funded work is already underway. The proposed contract would have an initial contract period of four years and eight months.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: Not applicable. The proposed contract for grant administration services is not a “project” under CEQA because no direct or indirect physical change to the environment is anticipated, nor does the grant administration services represent the type of activity described in Public Resources Code section 21065.

HEALTH IN ALL POLICIES (HiAP): Grant administration services is an important part of successful delivery of the projects funded by the NOAA grant. While award of the grant administration contract does not have direct relevancy to the pillars of HiAP, the projects funded by the NOAA grant do consider all three pillars of the initiative. First, the projects support the City’s sustainability and resiliency goals and plans by (1) improving the resiliency of the City’s low-lying areas, (2) the use of nature-based solutions for flood protection and (3) the carbon sequestration potential of nature-based solutions in mitigating carbon emissions. Second, the projects will contribute to improvement in public health in several ways by: (1) reducing the threat flooding poses to human life and safety, (2) reducing mold occurrence in buildings susceptible to flooding which will lead to improved respiratory health outcomes for those who reside and work in those buildings, and (3) reducing the potential of parasites, viruses, and other harmful pollutants contained in floodwaters in causing illness and disease. Last, the projects consider equity by (1) improving flood control capacity in our low lying, frontline neighborhoods, (2) developing the projects through early frontline neighborhood engagement and tribal consultation, (3) capacity building and coordination with the Monterey Bay Climate Justice Collaborative, and (4) developing multiple workforce development pathways.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No

7.2 FISCAL IMPACT DESCRIPTION: The fee for consulting services from The Ferguson Group is $799,500, which covers the scope of work outlined in Attachment: Professional Services Agreement. Grant funds awarded from the NOAA grant have been appropriated to project numbers c402513 (Main Beach Living Shoreline) and c302518 (Santa Cruz City Parks Flood Mitigation and Habitat Enhancement and Restoration) to fulfill the overall scope of the grant.

The funds for grant administration services will be divided between these two project numbers, depending on which project the contractor is working on. There will be no impact on the General Fund.

Prepared By:

Tiffany Wise-West
Sustainability and Resiliency
Officer
Submitted By:

Michelle Templeton
Assistant City Manager
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. EVALUATION TABULATION.PDF

2. PROFESSIONAL SERVICES AGREEMENT FOR NOAA GRANT ADMINISTRATION WITH THE FERGUSON GROUP.PDF

7.3 ATTACHMENT: EVALUATION TABULATION
Grant Administration Services for Coastal Restoration Project Vendor Total Score
(Max Score 100)
Regional Water Management Foundation 88.2
The Ferguson Group 81.94
Weaver and Tidwell, L.L.P. 81.14
Engineering Solutions Services, Inc. 76.95
HANA Resources, Inc. 74.53
EMC Planning Group 69.25

7.4 7.5

7.6 7.7

7.8 7.9

7.10 7.11

7.12 7.13

7.14 7.15

7.16 7.17

7.18 7.19

7.20 7.21

7.22 7.23

7.24 7.25

7.26 7.27

7.28 7.29

7.30 7.31

7.32 7.33

7.34 7.35

7.36 7.37

7.38 7.39

7.40 7.41
City Council

AGENDA REPORT
DATE: 02/11/2025
AGENDA OF: 03/11/2025
DEPARTMENT: City Manager
SUBJECT: 2025 Legislative Program (CM)
LOCATION: Citywide
RECOMMENDATION: Motion to adopt the 2025 Legislative Program.

BACKGROUND: The Legislative Program (Program) establishes the principles that will guide the City’s policy and legislative advocacy efforts at the regional, state, and federal level. The program focuses on the key areas that will enable the City of Santa Cruz to deliver projects and programs to meet the needs of our community. Adopted annually, the City’s Program serves as a reference to guide the development of positions on legislative proposals and provides guidance for the City Council and staff throughout the year.

The City Council reviewed the Program at their January 28, 2025 meeting and provided direction to staff on their top three priorities for 2025. In addition, the Council provided further direction on the legislative platform which has been incorporated into the 2025 Legislative Program.

DISCUSSION: Each year, the Program is updated to highlight legislative and funding priorities for consideration and adoption by the City Council. The City Council met in January and identified their top three priorities for 2025:

1. Pro-Housing Incentives: Advance legislation providing relief from the Density Bonus Law to local governments that are meeting state housing targets. This relief would be in the form of reducing incentives or concessions that a developer would otherwise be eligible for on a project.

2. Homelessness Response: Support unrestricted, on-going state funding to cities that support homeless prevention programs, outreach teams, shelter programs and encampment clean-up programs.

3. Infrastructure: Provide funding for projects that build resiliency, restore or replace the City’s aging infrastructure, especially transit, transportation & climate resiliency.

8.1 The City Council approved six key Platform issue areas, each with detailed policy positions as shown below. The policy positions have been updated to include direction provided by the City Council in January.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: The proposed Council action is not a “project” under CEQA because it does not have the potential to cause a physical change in the environment directly or indirectly.

HEALTH IN ALL POLICIES (HiAP): Adopting a Legislative Program ensures the pillars of HIAP are integrated into all aspects of governance, supporting a comprehensive and coordinated approach to improving health outcomes across different sectors. The Legislative Program can support the long-term goals of HiAP by shaping policies that address environmental sustainability, public safety, economic stability and other factors that influence health.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: No fiscal impacts.

Prepared By:

Lisa Murphy
Deputy City Manager
Submitted By:

Michelle Templeton
Assistant City Manager
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. 2025 CITY OF SANTA CRUZ LEGISLATIVE PROGRAM.PDF
2025 Legislative
Platform
Homelessness
Response
Housing
Public Safety &
Community Well
Being
Economic
Vitality
Sustainability &
Resiliency
Infrastructure &
Transportation

8.2 Legislative Program
2025

PREPARED BY
Fred Keeley, Mayor
Shebreh Kalantari-Johnson,
Vice Mayor
Sonja Brunner, Councilmember
Renee Golder, Councilmember
Scott Newsome, Councilmember
Gabriela Trigueiro, Councilmember
Susie O’Hara, Councilmember

8.3 Contents
Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 City Strategic Plan Focus Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4 SECTION 1:

Legislative Priorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 SECTION 2:

Legislative Platform . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 Housing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Infrastructure & Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Homelessness Response . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 Sustainability & Resiliency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Public Safety & Community Well-Being . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Economic Vitality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 SECTION 3:

Legislative Action Program Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 California State Legislative Timeline 2024 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 City of Santa Cruz 2025 Legislative Program

8.4 PURPOSE
2025 Legislative Program
The Legislative Program establishes the principles that will guide the City’s policy and legislative advocacy efforts at the regional, state, and federal level. The program focuses on key areas that will enable the City of Santa Cruz to deliver projects and programs that meet the needs of our community. The purpose of the program is to position the City to capitalize on funding opportunities and provide input into legislation in both Washington, D.C. and Sacramento.

Each year, the Legislative Program is updated in consultation with the Mayor, City Council, and City departments to highlight legislative and funding priorities for consideration and adoption by the City Council. Recognizing the importance of promoting priorities, the City develops a legislative program consistent with the City Council Strategic Plan. The City’s Legislative Program serves as a reference to guide the development of positions on legislative proposals and provides guidance for the City Council and staff throughout the year.

The Legislative Program is presented in three sections. The first section is the 2025 Legislative Priority Section. Each of these areas will be the focus of the City’s legislative advocacy efforts. The second section contains the City’s Legislative Platform.

The Platform is the City Council’s declared policies on various issues impacting the City.

The Platform sets forth the City’s legislative objectives for the 2025 legislative sessions, and provides direction for the City’s legislative representatives and advocates as they work to secure strategic initiatives in Sacramento and Washington, D.C. It is intended to articulate the City’s positions on issues that are currently, or anticipated to be, the focus of future legislation by the state or federal governments. The Platform streamlines the City’s advocacy efforts by enabling City staff to take immediate action on pressing legislative items efficiently and without delay under City Council direction. The last section is a Legislative Action Guide for Council and staff on how to appropriately advocate for legislation and budget provisions favorable to the City.

City of Santa Cruz 2025 Legislative Program

8.5 FOCUS AREAS

FISCAL SUSTAINABILITY & TRANSPARENCY
Cultivate a thriving downtownand local businesses citywide to support economic health and vitality.

STRONG BUSINESS COMMUNITIES & A VIBRANT DOWNTOWN
Ensure that the city is on a strong financial trajectory through planful investments and revenue development.

PUBLIC SAFETY & COMMUNITY WELL-BEING
Provide public safety services that support well-being and healthy communities.

Create and preserve housing for all with a focus on affordable and workforce housing.

HOUSING
Working with the County, move toward positive outcomes in homelessness response, safety, and health, balancing the interests of persons who are unhoused and housed, as well as the business community.

HOMELESSNESS RESPONSE

NATURAL & BUILT INFRASTRUCTURE
Invest in sustainable, climate-adapted infrastructure and community assets in both the natural and built environment.

THRIVING ORGANIZATION
Advance a high-performing organization where employees are empowered to deliver outstanding services to the community.

Seven multi-year focus areas were established in 2023, identifying outcomes to be achieved through an accompanying set of strategies.

CITY OF SANTA CRUZ STRATEGIC PLAN 2023–28

8.6 2025
Legislative
Priorities

PRO-HOUSING INCENTIVES
Advance legislation providing jurisdictions meeting certain criteria relief from Density Bonus Law. This relief would be in the form of reducing incentives or concessions that a developer would otherwise be eligible for on a project.

Provide funding for projects that build resiliency, restore or replace the city's aging infrastructure, especially transit, transportation & climate resiliency

INFRASTRUCTURE
While the Legislative Platform includes City Council-adopted objectives and directives regarding a wide array of issue areas impacting the City, the 2025 Legislative Priorities highlight funding and legislative priorities for the current legislative year. Priorities are developed in conjunction with various City departments, align with the strategic plan, and may shift from year-to-year based on the social, political, and economic environment.

The City identified three legislative priorities for 2025. These areas will be the focus of the City’s legislative advocacy efforts.

City of Santa Cruz 2025 Legislative Program

HOMELESSNESS RESPONSE
Support unrestricted, on-going state funding to cities that support homeless prevention programs, outreach teams, shelter programs and encampment clean-up programs.

8.7 Legislative
Platform
The Legislative Platform was developed to support the successful implementation of the City’s 2023–2028 Citywide Strategic Plan. The Legislative Platform provides additional information on policy issues to the City Council, City staff, and the City’s state and federal legislative advocates.

The Legislative Platform reflects the City’s priorities coupled with current public policy issues affecting local governments. With annual updates, its priorities will change to accurately reflect relevant policy issues facing the City, enabling City staff to accurately and efficiently impact legislation. Six areas were identified as City priorities to serve the community.
2025
Legislative
Priorities
Homelessness
Respoonse
Housing
Public Safety &
Well Being
Economic
Vitality
Sustainability &
Resiliency
Infrastructure &
Transportation
City of Santa Cruz 2025 Legislative Program

8.8 SUPPORT REQUESTED
Advance legislation providing jurisdictions that meet certain criteria with relief from Density Bonus law. This relief would be in the form of reducing incentives or concessions that a developer would otherwise be eligible for in the process of negotiating the development of a project. Criteria could include a jurisdiction that has a pro-housing designation, met Regional Housing Needs Assessment (RHNA) targets in the previous cycle, met a pro-rated share of RHNA targets in the current cycle, or is a self-help jurisdiction.

SUPPORT REQUESTED
Legislation requiring zoning ordinance amendments that, absent those amendments, would cause the jurisdiction’s zoning ordinance to be null and void (e.g., for ADU legislation) should go into effect on July 1 of the following year instead of January 1 of the following year, as the January 1 effective date necessitates an urgency ordinance Advocate for, sponsor, or support legislation or budget provisions that would:

Support housing production with an emphasis on production and protection of affordable, permanent supportive, and workforce housing.

Support legislation that would provide cities with more local discretion when the City meet's it's RHNA goals.

Support improved mobility options for cities in light of new state laws prohibiting parking requirements for new development.

Fund the creation and preservation of affordable and supportive housing in the City, emphasizing low- and very-low-income households and workforce housing.

Support the construction of affordable housing and permanent supportive housing programs.

Increase the range of CEQA exemptions. Discourage, limit, and streamline legal challenges to housing projects, including but not limited to CEQA lawsuits.

Increase Section 8 or other rental subsidies to accommodate areas with the highest market-rate rents or lowest ratio of incomes to housing costs in the state.

Amend both federal and State Low-Income Housing Tax Credit Programs to support and deem competitive a mix of units in an affordable housing project.

Limit or eliminate ballot initiative options that serve as barriers to housing.

City of Santa Cruz 2025 Legislative Program
PRIORITY:

HOUSING

8.9 SUPPORT REQUESTED
Seeking funding for water supply project design and implementation including water diversion(s), treatment, and storage. Sources may include USBR, funding through SB867 Climate Resilience Bond, funding through DWR’s SGMA Grant Program.

SUPPORT REQUESTED
Provide funding for projects that build resiliency, restore or replace the City's aging infrastructure, especially transit, transportation & climate resiliency.

Allocate funding for the upgrading, replacement, and construction of needed infrastructure at the local level.

Create transportation policies that fund long-term maintenance and development of infrastructure projects.

Fund park development, infrastructure, and maintenance.

Fund cost-effective water ecosystem projects and ensure direct beneficiaries and cost causers fund their fair share of projects that provide long-term benefits to the state and its inhabitants.

Fund projects and programs to increase water system resiliency to drought by supporting increased storage of available surface water through aquifer storage and recovery and further development of alternative supplies, such as advanced purified recycled water.

Maintain and strengthen local control of water use and encourage water recycling and the many benefits of sustainability to Santa Cruz’s water supply.

Secure $15M in funding for San Lorenzo River Pump Station Upgrades. The upgrade and addition are necessary as existing infrastructure is undersized and reaching end of life. The pump stations are critical as is protects the downtown businesses, residents, and river basin area.

Secure $40M in funding for the Wastewater Treatment
Facility (WWTF) electrical upgrades. The WWTF is a regional facility serving over 100,000 residents and has antiquated equipment that has reached end of life.

Secure $20M in funding for Rail Trail Segment 8 and 9.

The project is a 2.2-mile, 12-foot wide, multi-use path that connects the City and County. 48,000 residents,
15 schools, and 37 parks are within 1-mile of this project.

City of Santa Cruz 2025 Legislative Program
PRIORITY:

Infrastructure &
Transportation

8.10 Support Requested
Support unrestricted, on-going state funding to cities that support homeless prevention programs, outreach teams, shelter programs and encampment clean-up programs.

Advocate for, sponsor, or support legislation and budget provisions that would:

Enact statewide legislation that prohibits/discourages jurisdictions from transporting persons experiencing homelessness to other jurisdictions without appropriate coordination, including the development of a comprehensive safety plan to ensure the health and welfare in the new jurisdiction of persons experiencing homelessness.

Provide homelessness prevention and services funding directly to cities proportionate to the rate of homelessness and the accompanying local impacts in that City.

Expand the availability and funding of mental health and substance use disorder treatment services and facilities.

Provide sustainable funding for transitional and permanent supportive housing units to house homeless individuals and families.

Expand and maintain support for basic food, hygiene, and safety needs, especially for highly vulnerable populations, including persons living with a mental health diagnosis, persons with substance use disorders, veterans, older adults, and persons with disabilities.

Take a balanced approach that addresses the need for services for people experiencing homelessness while upholding the health, safety, and welfare of all people in Santa Cruz.

Advocate for implementation of various Mental Health and Behavioral Health related legislation specifically as it relates to implementing Proposition 1.

Advocate for state funding to be based on per capita rate of homelessness and not just on Point In Time counts.

Advance regional initiatives involving county, state, and federal governments to reduce chronic homelessness.

City of Santa Cruz 2025 Legislative Program
PRIORITY:

Homelessness
Response

8.11 SUPPORT REQUESTED
Rapidly enact equitable climate solutions that support and enhance sustainability and resiliency and ensure effective performance of essential services, such as water and wastewater utilities and the protection of watershed lands, in the face of climate change effects already in motion. Grow the green economy through workforce development.

SUSTAINABILITY
Advocate for, sponsor, or support state and federal legislation or budget provisions that would:

Increase the adoption of electric vehicles and charging infrastructure.

Reduce emissions from transportation by increasing walking, biking, and access to public transportation, including future rail transit.

Support telework policy and infrastructure.

Eliminate natural gas use.

Equitably electrify buildings and bolster building stock resiliency through energy efficiency, local solar installations, and microgrids.

Provide stable and fair electricity rates, fees, and solar generation credit.

Increase the efficiency of water and wastewater transportation and treatment.

Reduce the amount of organic and inorganic waste entering the City’s landfill through producer responsibility initiatives, recyclable pre-processed material incentives, and the reduction of single-use products.

Advance local government’s ability to set local policies relating to environmental “sustainability,” including but not limited to building standards and land use planning.

Encourage innovation in carbon sequestration and carbon capture technology.

Provide capacity and resources to scale up municipal efforts and regional coordination to rapidly draw down carbon.

Support ongoing management of watershed lands including field activities and policy development to support healthy forests and source water protections.

City of Santa Cruz 2025 Legislative Program
PRIORITY:

Sustainability &
Resiliency

8.12 RESILIENCY
Advocate for, sponsor, or support state and federal legislation or budget provisions that would:

Fund and implement projects and programs for upgrading existing water, wastewater, and stormwater facilities and services to ensure effective functioning in the face of changing climate conditions, including increasing incidents of extreme weather.

Promote prevention and mitigation of wildfires by mandating responsible power management, funding fuel reduction and forest management activities, support protection of source water, and community engagement.

Fund coastal resilience and citywide climate adaptation studies, planning, monitoring and implementation.

Promote training and development initiatives that support the collaboration between community partners and fund training and development for youth, veterans, and underemployed individuals in green jobs supporting the City’s sustainability and resiliency priorities.

Fund capacity and resources for equitable engagement of frontline communities on resilience issues.

City of Santa Cruz 2025 Legislative Program
PRIORITY:

Sustainability &
Resiliency

8.13 SUPPORT REQUESTED
Legislation to regulate E-bikes and promote E-bike safety.

Legislation to address AB109 including allocating more resource for the following: county probation departments; funding for treatment options; strengthening data collection and analysis to track the outcomes of AB109 offenders.

Advocate for, sponsor, or support legislation or budget provisions that would Support measures that encourage community safety and wellbeing.

Support funding and programs for non-law enforcement response to those experiencing a mental health crisis.

Support funding for local law enforcement equipment, services, or personnel.

Support funding for local emergency operations including equipment, services, and personnel.

Support bills that restrict access to firearms and ammunition.

Support increased funding for law enforcement training costs related to homelessness and mental health.

Funding and programs addressing police officer wellness and mental health.

Oppose legislation that makes recruitment into law enforcement more difficult.

Support bills increasing the penalties for those supplying Fentanyl.

Support funding toward technological advancements. Including legislation on AI, specifically the ethical use of AI, privacy protection, transparency and accountability.

Support funding for a new County jail facility in South County Support legislation that develops and expands programs to encourage and support the City’s emergency preparedness initiatives.

Legislation supporting funding for public safety infrastructure.

Legislation that supports fire department medical transport efforts.

PRIORITY:

Public Safety &
Well-Being

8.14 CONT. Advocate for, sponsor, or support legislation or budget provisions that would Support existing legislation and initiatives that protects marginalized populations such as immigrants and LGBTQ+
Support legislation that decreases the use and consumption of harmful substances and products to youth and vulnerably populations such as Active hemp, and sugar sweetened beverages.

Advocate & support legislation that expands access to affordable childcare and promotes childcare workforce initiatives.

Legislation that will provide increased investment in youth programs and policies that ensure safe and inclusive spaces for youth engagement and recreation.

Legislation to enhance support for fixed-income seniors such as affordable housing, healthcare services and transportation to improve seniors quality of life.

Legislation and Policies that supports & protects undocumented immigrants, and promote Sancturary policies.

Support legislation that enhances wildfire prevention & preparedness.

Advocate for policies that ensure the availability & affordability of of insurance in wildfire prone areas.

Support legislation to implement Proposition 36.

PRIORITY:

Public Safety &
Well-Being

8.15 SUPPORT REQUESTED
Diversify revenue generation through actively pursuing new and varied sources. Support local economic recovery and regeneration of tourism dollars by seeking supports for local businesses and workers.

Advocate for, sponsor, or support state and federal legislation or budget provisions that would:

Oppose state preemption of local authority to generate revenue.

Preserve and enhance federal assistance to local governments and oppose federal preemption of local authority.

Prevent the state from borrowing, raiding, or otherwise redirecting local government funds (e.g., local taxes, sales tax, property taxes, etc.).

Ensure increased flexibility for the use of municipally generated revenues, such as the Public Education and Government fee, Utility Users Tax, and Development Impact Fees.

Retain and promote the success of local businesses.

Replace redevelopment funding mechanisms within the City and state.

Preserve funding mechanisms to promote continued economic development, including initiatives to provide financing for infrastructure and affordable housing.

Fund opportunities for small business assistance, loan programs for business improvements, and tax credits for businesses.

Provide tangible and productive tools and incentives to support job creation and retention.

Create a funding mechanism to accelerate innovation and entrepreneurship in the region.

Fund programs and projects that maintain the affordability of essential services provided by the City’s water and wastewater systems and other critical infrastructure, which serve as the foundation for economic vitality.

Maintain cities’ abilities to require only commercial and industrial uses on potential development sites.

PRIORITY:

Economic Vitality
City of Santa Cruz 2025 Legislative Program

8.16 Legislative Action
Manual
Internal Coordination of
the Legislative Program
Track
Legislation is tracked by the City Manager’s
Office or brought to the City’s attention by
residents, agencies, departments,
organizations, public servants, and others.

In addition, departments are urged to take
the initiative to identify legislation of
importance to the City.

Review
The City Manager’s Office reviews the
proposed legislation and, if warranted,
requests assistance from one or more
departments. The City Manager or the
appropriate departments evaluate the bill for
its impact on the City of Santa Cruz,
recommend a position and potential action,
and, as appropriate, draft a statement or
letter for use by the City Manager’s Office.

Determine Course of Action
One of two actions can be taken:

If the City Council has adopted a policy
directly relevant to the legislation of
concern, the City Manager’s Office may
proceed to prepare a letter for the
Mayor’s signature;
If City Council policy does not exist, if
the issue is politically controversial, or if
there is significant local interest in the
issue(s) posed by the legislation, the
proposed legislation is referred to the
City Council.

Referral to Council
The City Council will consider the
information provided in a staff report,
determine its position on the legislation and
provide appropriate direction to staff.

Advocacy
The City Council, staff delegate, or
government relations consultant will connect
with appropriate legislative bodies
throughout the legislative year.

Engagement Strategies
Staff and the City’s government relations
consultants will employ a variety of public
engagement strategies to support the 2025
Legislative Program, including:

Direct Engagement
Engage policymakers directly and guide
sponsored legislation, submit
correspondence, and provide public
testimony that communicates and advances
the City’s legislative and budget priorities
and positions.

Building Coalitions
Engage local, regional, and statewide
stakeholders to advocate on specific issues
and participate in local, regional, statewide,
and national coalitions organized to advance
positions that are consistent with the 2025
Legislative Program. Lead a statewide
coalition of coastal cities to advocate for
policy and funding reform around the issue
of homelessness.

Agency Connections
Foster and build state and federal agency
relationships to advance state and federal
funding competitiveness for the priorities
identified in the 2025 Legislative program.

City of Santa Cruz 2025 Legislative Program

8.17 Legislative Action Manual
The Role of the City
Manager’s Office
The City Manager’s Office is the central
coordinator of the City’s legislative program.

Some of the City Manager’s Office
responsibilities include:

Ensuring the consistency of legislative
policy throughout the City.

Serving as a clearinghouse and record
keeper for all legislative activity
occurring within the City.

Coordinating contacts and
communications with legislators and
staff.

Coordinating the evaluation of proposed
legislation that may affect the City.

Disseminating information on legislation
of interest to departments and divisions
within the City.

Encouraging suggestions from other
departments concerning subjects for
legislative action.

Providing feedback to departments on
the progress of legislation of interest.

Keeping the Council informed of the
status of the City’s legislative program.

Recommending priorities for legislative
action to ensure the effectiveness of the
City’s lobbying activities.

Planning, coordinating, and facilitating
lobbying activities by Councilmembers
and staff.

Maintaining legislative files (bill texts,
correspondence, records of lobbying
activity, background information, Council
policies).

Serving as liaison to Cal Cities, the
National League of Cities, and other
organizations and jurisdictions
concerning legislative activities.

Coordinating the annual review of
legislative positions and preparing the
City’s legislative platform.

The Role of the
City Council
The City Council has ultimate responsibility
for determining the position the City will take
on legislative issues. City Council positions
applicable to legislation accumulate over the
years and require periodic reevaluation to
assure they are still relevant to the City’s
needs and interests. The Council generally
takes positions only on those issues that are
of relevance to the City of Santa Cruz.

Some of the City Council’s responsibilities
include:

Conducting an annual review and
updating legislative priorities at both the
state and federal levels, taking the
Council’s own strategic priorities into
account.

Considering legislative issues brought to
the Council’s attention by staff,
residents, organizations, and others and
determine what, if any, position the City
should take.

Determining Council positions on
resolutions proposed for adoption by Cal
Cities (formerly the League of California
Cities) and the National League of Cities.

Suggesting areas for staff action
concerning legislation.

Assuming an active advocacy role with
legislators on behalf of the City. This
may include travel, which will be
consistent with current City
policies/procedures on travel.

City of Santa Cruz 2025 Legislative Program

8.18 Legislative Action Manual
Guidelines for Evaluating
Legislation
Bills are frequently amended during their
introduction and approval processes. Due to
this, analyses and letters expressing the
City’s position should be based on the most
up-to-date version of the bill.

Citywide Perspective
Bills often impact multiple departments in
different ways. Therefore, it is essential that
these different impacts are taken into
consideration to form a balanced citywide
position. It is the responsibility of the City
Manager’s office to work with departments
to reconcile differences.

Stating the City’s Position
If the department recommendation is to
support, oppose, or amend a bill, it is
important to draft the body of a letter that
the City Manager’s Office can use in writing
to the legislators. The City Manager’s Office
will put the letter in final form and send it to
the appropriate committees, legislators, etc.

A copy of the finalized letter will be routed
to the evaluating department for its records.

Other Key Aspects
Providing feedback to departments on
the progress of legislation of interest.

Keeping the Council informed of the
status of the City’s legislative program.

Recommending priorities for legislative
action to ensure the effectiveness of the
City’s lobbying activities.

Planning, coordinating, and facilitating
lobbying activities by Councilmembers
and staff.

Maintaining legislative files (bill texts,
correspondence, records of lobbying
activity, background information, Council
policies).

Serving as liaison to Cal Cities, the
National League of Cities, and other
organizations and jurisdictions
concerning legislative activities.

Coordinating the annual review of
legislative positions and preparing the
City’s legislative platform.

The Role of Departments
The participation of the City’s various
departments is essential to the success of
the Legislative Program. The program
requires departments to take responsibility
for identifying, evaluating, and monitoring
legislation related to their functional areas.

Steps to Take
Inform the City Manager’s Office of
legislative issues key to the City.

Designate a contact within the
department or division who will be
responsible for coordinating the
evaluation of legislation and monitoring
legislative issues of direct significance
to the department. Continue to monitor
bills as they progress through the
Legislature or Congress.

Establish a system within the department
for assuring that requests for the
evaluation of legislation are addressed
promptly.

Draft letters and provide analysis of
legislation as requested by City
Manager’s Office.

Maintain a legislative file with the
department to ensure consistency of
policy recommendations.

Establish mechanisms within the
department for accessing direct
information on legislation.

Network with other cities, agencies,
professional organizations, etc., to gain
background information and a broader
perspective on legislative issues.

Suggest organizations, individuals,
publications, and legislators who may be
allies in lobbying the City’s position on
legislation.

Understand and adhere to the City’s
Legislative Advocacy Policy. Consult the
City Manager’s Office if there are
questions.

Provide annual department
recommendations to the City Manager’s
Office for the ensuing year’s legislative
platform including review of existing
positions; statements of underlying
policies and principles; and priorities
related to specific legislative issues.

City of Santa Cruz 2025 Legislative Program

8.19 Legislative Action Manual
City Advisory Commissions and
Committees
City employees who are staff or liaisons to
Council-appointed advisory commissions
and committees should encourage the
bodies to alert the Council to legislation on
which they recommend taking a position.

Should legislative analysis and advocacy be
a required function of the advisory
commission or committee, those bodies shall
ensure that function is carried out according
to its bylaws.

Lobbying Methods
Listed here are a number of ways to inform
and persuade legislators and others of the
City’s position on proposed legislation.

Departmental participation in the planning
and implementation of these activities is
critical to the City’s success. Departments
should let the City Manager’s Office know of
its interest and suggestions for lobbying bills
they have evaluated.

Letters
Letters to the following groups or individuals
must follow specific protocol.

The authors of proposed legislation
The City’s elected representatives in the
state Legislature and CongressThe Chair
and members of legislative committees
The Governor or President
To submit a position letter to a committee
you must first register on the California
Legislature Position Letter Portal. After you
complete your registration, you can submit
your position letter to communicate your
views to the bill author’s staff as well as the
committee that will be hearing the bill. Most
committees require letters a week in
advance of a hearing. All records of mail and
e-mail will be maintained by the City
Manager’s Office.

Telephone calls
Phone calls are useful for discussing with
legislative staff the content and implications
of a bill and for suggesting amendments or
language clarification. However, many
committees’ rules prevent them from
counting phone calls as a legitimate
expression of a City’s position on a bill. Proand con-positions are recorded if they are received in writing.

Legislative Advocacy
The City Council holds the final authority for
determining the position that will be taken
by the City on legislation. The process
outlined below would likely be followed only
for key and controversial topics. Due to
timing or the nature of the issue, the Mayor
may sign a letter supporting or opposing
legislation on behalf of the City. This position
would need to be consistent with the City’s
overall guiding legislative principles or the
annually adopted priorities.

Process
Signatures
Letters and other communications
expressing the City’s position on legislation
will customarily bear the signature of the
Mayor, particularly when the legislation
relates to areas of City policies and
programs, other Council adopted policies,
issues of Council interest, and fiscal matters.

Letters and Other Communications
Expressing the City’s position on legislation
not related to areas of City policies and
programs, other Council adopted policies,
issues of Council interest, and fiscal matters
require Council direction for the Mayor’s
signature.

If the legislation’s principal impact is on the
City’s operating procedures, the City
Manager may sign the communication.

Copies of the letters will be distributed in the
Council agenda packet to keep the Council
and others informed of all City
communications on legislation.

Independent Lobbying by City Personnel
City employees are not to lobby in the name
of the City of Santa Cruz unless the
department head has approved the activity,
and the City Manager has been informed in
advance of the activity.

City of Santa Cruz 2025 Legislative Program

8.20 Legislative Action Manual
Letter Writing
Concentrate on the letter content, rather
than format. The City Manager’s Office
will produce the final letter, addressing it
to the proper legislators or committees
and securing the appropriate signature.

At the start of the letter, indicate the bill
number or legislative title that is the
subject of the letter.

A short, concise letter is generally more
effective than a lengthy treatise.

Provide specific examples of the impact
of the legislation on the City of Santa
Cruz.

When it is appropriate, discuss the
effects of the proposed legislation on the
legislator’s constituents.

City Council Meetings with Elected
Representatives
Typically, the City Council meets annually
with its county, state, and federal
representatives. These meetings are an
important component of building legislative
relationships and to share issues of
importance to the City of Santa Cruz. These
meetings should be scheduled at the
appropriate times during the respective
legislative calendars.

At direction of City Council, the other
Elected Representative, or the City Manager,
staff will schedule a meeting with the
representative. The City Manager will seek
agenda items from the Mayor and Council.

Staff from the City Manager’s Office will
obtain agenda items from Departments and
staff in the representative’s office.

Useful Links
Know your legislator
Overview of the legislative process
How to look up a bill
Lobbying Methods, Continued
Meeting with elected representatives in
the district, Sacramento, or Washington
It is Council’s practice to invite legislators
representing Santa Cruz to an annual
meeting to discuss all issues of importance
to the City during that legislative session.
·Councilmembers are encouraged to attend
legislative days set by the National League
of Cities or Cal Cities.

Resolutions
The Council is sometimes asked to adopt a
resolution expressing its position on a bill.

Resolutions are frequently sought by
organizations as an indication of widespread
support for a position, but they are less
effective than letters when communicating
directly with a legislator.

Testimony
Testifying in person at a legislative
committee hearing provides an opportunity
to present the City’s position and respond to
questions. The City Manager, the Mayor, a
Councilmember, or the staff person with
particular expertise in the subject assumes
the responsibility.

Editorial support from newspapers serving
the Santa Cruz community
·Staff members must seek approval from the
City Manager’s Office before submitting
editorials in newspapers.

Press Conferences
Press conferences are called by the City
Manager or the Mayor and are staged in a
location relevant to the issues being lobbied.

Any press conference should be coordinated
with the City Manager’s Office.

Coalitions with other jurisdictions
These alliances are not limited to
governmental bodies, but extend to all
segments of the broader community that
can similarly be affected by the legislation,
e.g. businesses, nonprofit organizations,
environmental groups, etc.

City of Santa Cruz 2025 Legislative Program

8.21 2025 California Legislative Timeline
January 1 Statutes take effect.

January 6 Legislature reconvenes.

January 10 Budget must be submitted by the Governor.

January 24 Last day for policy committees to hear and report to fiscal committees’ fiscal bills introduced in their house in the odd-numbered year.

Last day to submit bill requests to the Office of Legilative Counsel.

February 21 Last day for bills to be introduced.

April 10 Spring Recess begins upon adjournment.

April 21 Legislature r3econvenes from Spring Recess.

May 2 Last day for policy committees to hear and report fiscal committee’s fiscal bills introduced in their houses.

May 9 Last day for policy committees to hear and report to the floor non-fiscal bills introduced in their house.

May 16 Last day for policy committees to meet prior to June 9.

May 23 Last day for fiscal committees to hear and report to the floor bills introduced in their house.

June 2 – 6 Floor session only. No committee may meet for any purpose.

June 6 Last day for each house to pass bills introduced in that house.

June 9 Committee meetings may resume.

June 15 Budget Bill must be passed by midnight.

July 18 Last day for policy committees to meet and report bills.

Summer Recess begins on adjournment, provided Budget Bill has passed.

August 18 Legislature reconvenes from Summer Recess.

September 2 – 12 Floor session only. No committee may meet for any purpose.

September 5 Last day to amend on the Floor.

September 12 Last day for each house to pass bills. Final Recess begins upon adjournment.

October 12 Last day for Governor to sign or veto bills passed by the Legislature on or before September 12 and in the Governor’s possession after September 12.

8.22 8.23
Passage refused.

SUGGESTIONS FOR NEEDED LEGISLATION
from Agencies, Citizens, Governor, Lobbyists Senator
Assembly
Member

ASSEMBLY RULES COMMITTEE
Steps for Bill Passage
•
Some bills require hearing by multiple
committees — one committee may
re-refer the bill to another. Bills with
monetary implications must be rereferred to the proper fiscal committee in each House before they
are sent to the second reading and
final action.
•
A bill may be amended multiple times
as it moves through the Houses and is
reprinted each time an amendment is
adopted. All bill actions are printed in
the Daily Files, Journals, and Histories.
•
If a bill is amended in the opposite
house, it is returned to the House of
Origin for concurrence in
amendments. If the House of Origin
does not concur, a Conference
Committee Report must then be
adopted by each House before the bill
can be sent to the Governor.

Introduced by member, numbered,
first reading, printed.

Rules assigns bill to committee.

Committee Hearing:

Policy or appropriations chairperson and
members; bill author; citizens; experts; and
lobbyists testify.

Held in committee. Committee
recommendations pass.

Proposed
Amendments.

Assembly bill prepared by Legislative Counsel.

Introduced by member, numbered,
first reading, printed
Rules assigns bill to committee
Committee Hearing:

Policy or Appropriations chairperson and
members; bill author; citizens; experts; and
lobbysists testify.

Senate bill prepared by Legislative Counsel
Second Assembly reading.

Third Assembly reading. Debate. Vote.

Passage refused.

Revised third
reading analysis
Held in committee. Committee
recommendations pass.

Second Senate reading.

Third Senate reading. Debate. Vote.

Proposed
Amendments.

Revised third
reading analysis TO ASSEMBLY TO SENATE
Rules assigns bill to committee
First Assembly reading.

Committee Hearing:

Policy or Appropriations chairperson and
members; bill author; citizens; experts; and
lobbysists testify.

Held in committee. Committee
recommendations pass.

Rules assigns bill to committee
First Senate reading.

Committee Hearing:

Policy or Appropriations chairperson and
members; bill author; citizens; experts; and
lobbysists testify.

Held in committee. Committee
recommendations pass.

Passage refused.

Second Assembly reading.

Third Assembly reading. Debate. Vote.

Proposed
Amendments.

Revised third
reading analysis BILL PASSES
Passage refused.

Second Senate reading.

Third Senate reading. Debate. Vote.

Proposed
Amendments.

Revised third
reading analysis BILL PASSES
Without Assembly
amendments.

With Assembly
amendments.

Without Senate
amendments.

With Senate
amendments.

Return to Assembly floor. Concurrence in
Senate Amendments.

GOVERNOR
Return to Senate floor. Concurrence in
Senate Amendments.

YES
NO
NO YES
Conference Committee:
3 Assembly Members
3 Senate Members
Conference Report
Assembly and Senate
Adopt Conference Report

SIGN VETO
Becomes law
without
signature
Bill is chaptered by
Secretary of State.

Bill becomes law January 1
of the following year unless
it contains an urgency
clause (takes effect
immediately) or specifies its
own effective date.

BILL BECOMES LAW
Legislature has
60 days (not
including joint
recesses) to
override veto
with 2/3 vote in
each house.

CALIFORNIA LEGISLATION LIFE CYCLE
From Idea into Law

8.24 City Council

AGENDA REPORT
DATE: 02/20/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Public Works
SUBJECT: 2024 Citywide Sewer/Storm Drain Lining Project (c401511) – Notice of Completion (PW)
LOCATION: Citywide
RECOMMENDATION: Motion to accept the work of Insituform Technologies, LLC. (Chesterfield, MO) as completed per plans and specifications, authorize the filing of the Notice of Completion for the 2024 Citywide Sewer/Storm Drain Lining Project (c401511), and authorize the Public Works Director to sign the Notice of Completion as the Owner’s Authorized Agent.

BACKGROUND: At its June, 25, 2024 meeting, the City Council approved the authorization to advertise the 2024 Citywide Sewer/Storm Drain Lining Project and authorized the City Manager to execute the contract. On August 6, 2024, the project was awarded to the lowest responsive and responsible bidder, Insituform Technologies, LLC. Construction began on December 6, 2024 and included the rehabilitation of 2,541 linear feet of the City’s sanitary sewer and 173 linear feet of the City’s storm drain through the cured-in-place pipe method (CIPP).

Nine associated manhole structures were rehabilitated with a cementitious coating.

DISCUSSION: Work for this project is now complete, and has been inspected by Public Works staff, and has been found to be completed in accordance with the project’s plans and specifications. Utilization of this trenchless repair technology enables the City to cost effectively extend the working life of infrastructure while minimizing construction impacts.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: The 2024 Citywide Sewer/Storm Drain Lining Project is Categorically Exempt from environmental review under the California Code of Regulations Title 14 § 15302 (c), “Replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansions of capacity.”
HEALTH IN ALL POLICIES (HiAP): This project promotes the following Health in All Policies Conditions: Health and Wellness; Healthy Environments. The 2024 Citywide Sewer/Storm Drain Lining Project aligns with the City’s HiAP by rehabilitating critical City infrastructure through the non-invasive pipe installation method of CIPP and extending the service life of the City’s sewer and storm drain collections. Using this installation method

9.1 resulted in less traffic impacts and disruption to the neighborhood when compared to the traditional open-cut replacement.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: The total project construction cost was $523,084.22 and was funded by the Capital Investment Program (CIP) project c401511. There is no impact to the General Fund.

Prepared By:

Cina Seyedkazemi
Assistant Engineer II
Submitted By:

Nathan Nguyen, P.E.

Director of Public Works
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. NOTICE OF COMPLETION.DOCX

9.2 Notice of Completion (Revised Oct 2021)
(Space above for Recorder’s use only)
This instrument is being recorded for the benefit of the City of Santa Cruz.

No recording fee is required pursuant to Government Code § 27383.

NOTICE OF COMPLETION
(CA Civil Code Sections 8102 and 9204)
NOTICE IS HEREBY GIVEN THAT:

The undersigned is an authorized representative of the owner of the interest or estate stated below.

1. The Owner’s Name and Address. The Project owner is the City of Santa Cruz, a municipal corporation (the “City”). The City’s mailing address is 809 Center Street, Santa Cruz, California 95060. The City of Santa Cruz has the following interest in the subject Property described below: City Right-of-Way and Easements

2. Project Title and Number. The full name of the work of improvement/public works project (the “Project”) which is the subject of this Notice of Completion is: 2024 Citywide Sewer/Storm Drain Lining Project (c401511)

3. Nature of Work Performed on the Property or Materials Furnished for the City. The Project consisted of work described as: Rehabilitating City sanitary sewer and storm drain collections using the cured-inplace pipe method. Rehabilitating associated structures with a cementitious coating.

4. The general site location description or address (the “Property”) of the public improvement is located at: Morrissey Blvd, Centennial St, Oxford Wy, De La Costa Ave, Gault St, Columbia St, Stockton Ave, Allegro Dr, Laurent St

5. Name and Address of Contractor. The Contractor on the Project is: Insituform Technologies, LLC, 580 Goddard Avenue, Chesterfield, MO 63005

6. Construction Lender. The name and address of the construction lender, if any, is: N/A

7. Date of Completion. The Project on the Property was completed on: February 6, 2025

8. The filing of this Notice of Completion was authorized by the Santa Cruz City Council Minute Order on Tuesday, March 11, 2025
DATE: ___________________
Nathan Nguyen
Director of Public Works, City of Santa Cruz
RECORDED AT THE REQUEST OF:

City of Santa Cruz, Public Works
Attn: Cina Seyedkazemi
WHEN RECORDED MAIL TO:

City Clerk’s Department
809 Center Street, Room 9
Santa Cruz, CA 95060

9.3 Notice of Completion (Revised Oct 2021) 9.4
City Council

AGENDA REPORT
DATE: 02/20/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Public Works
SUBJECT: City of Santa Cruz Resource Recovery Facility Appliance Recycler Services – Award of Contract (PW)
LOCATION: District 6
RECOMMENDATION: Motion to award the Appliance Recycler Services contract to Campos Bros. Recovery, Inc. (West Sacramento, CA). The City Manager is hereby authorized and directed to execute the contract in a form approved by the City Attorney, as authorized by Resolution No. NS-27,563. The Public Works Director is authorized to execute change orders within the approved project budget.

BACKGROUND: At its June 25, 2024 meeting, City Council approved the specifications for the City of Santa Cruz Resource Recovery Facility (SCRRF) Appliance Recycler Services to advertise the project for bids. The project was advertised on OpenGov as IFB No. PW-0139 SCRRF Appliance Recycler Services between August 2, 2024 and August 26, 2024. Two bids were received at the bid opening on August 26, 2024.

DISCUSSION: Freon Free, Inc. was the apparent low bidder at the time of bid opening. City staff sent out the Notice of Intent to Award (NOITA) via email on September 6, 2024 notifying both bidders of the City’s intent to award the project to Freon Free Inc. after determining that all the bid packets were complete.

As part of their due diligence in determining that Freon Free Inc. was responsive, City staff then reviewed the required documents to complete the award of the service contract. At issue here is that Freon Free Inc. changed their company name to Freon and Metal Recycling Company in October 2024 due to the death of their business owner. With this change, the City’s requested Freon and Metal Recycling Company to provide DTSC’s Appliance Recycler Certification under the new company name. With the understanding that it might take time to get a new company’s documentation in order, City staff extended the timeline to provide the certification.

In November 2024 and January 2025, City staff followed up on their request of the certification from Freon and Metal Recycling Company, but did not receive the required paperwork. On February 6, 2025, the City sent out a Notice of Non-Responsiveness to Freon and Metal Recycling Company to inform them that their bid has been deemed non-responsive.

10.1 The City followed the Notice of Non-Responsiveness with a Notice of Intent to Award informing both bidders that the City intends to award the contract to the lowest responsive and responsible bidder, Campos Bros. Recovery, Inc., for their responsive and responsible bid on this project.

The lowest bidder was unable to provide the proper documentation, therefore rendering their bid non-responsive.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: This is not a project under CEQA.

HEALTH IN ALL POLICIES (HiAP): This program promotes the following Health in All Policies Conditions: The appliance recycling services offered at the SCRRF contributes to the Healthy Environments pillar of Health in All Policies Conditions. It addresses the CORE Community Indicators of “Concern for the environment” and “Environmental stewardship.” FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: Funds are available in the FY 2025 Refuse Fund Operating Budget. There is no impact to the General Fund.

Prepared By:

Hoi Yu
Associate Professional
Engineer
Submitted By:

Nathan Nguyen, P.E.

Director of Public Works
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

None.

10.2 City Council

AGENDA REPORT
DATE: 02/20/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Public Works
SUBJECT: Active Transportation Plan (c402408) - Outreach Consulting Contract Amendment 1 (PW)
LOCATION: Citywide
RECOMMENDATION: Motion to approve Contract Amendment 1 with Ecology Action (Santa Cruz, CA) reducing the original contract to $53,186 for outreach consulting for the Active Transportation Plan Update and authorize the City Manager to execute the contract amendment in a form approved by the City Attorney. The Public Works Director is authorized to execute future contract amendments within the approved project budget.

BACKGROUND: At its April 11, 2023 meeting, City Council authorized the City Manager to apply for, accept, and appropriate funds from the California Department of Transportation Sustainable Transportation Planning Grant Program for the Active Transportation Plan Update.

On August 31, 2023, the City of Santa Cruz (City) was notified of the successful grant award. At its October 10, 2023 meeting, Council adopted resolutions to execute grant agreements with Caltrans and execute a budget adjustment to reflect the grant award.

At its April 30, 2024 meeting, City Council adopted a recommendation to award a contract for outreach consulting for the Active Transportation Plan Update to Ecology Action for $118,000.

Due to changes in staffing capacity, the City and Ecology Action have collaborated to reduce the scope of services in the contract award to ensure project delivery.

DISCUSSION: The City worked with Ecology Action on the Active Transportation Plan grant application, with Ecology Action identified as a sub-applicant. Ecology Action has deep connections in the Santa Cruz community, having completed similar projects for the City, County of Santa Cruz, and cities of Watsonville and Scotts Valley. Their deep understanding and relationships with local groups enhance the results of these complex planning efforts.

Since the contract with Ecology Action was awarded, Ecology Action has experienced significant staffing changes. These staffing changes limit the ability of Ecology Action to fully deliver the originally contracted scope of services at this time. Specifically, Ecology Action will no longer provide support for the technical advisory committee or existing conditions inventory.

Instead, these tasks will be provided by a combination of City staff and other consultants. The remaining tasks will be completed by Ecology Action at a reduced level of effort with added

11.1 support by City staff and others. These changes allow the project to move forward on time and on budget while still leveraging Ecology Action’s local expertise.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: The Active Transportation Plans qualify for a Statutory Exemption under PRC Section 21080.20(a)(1), which states:

This division does not apply to an active transportation plan, a pedestrian plan, or a bicycle transportation plan for the restriping of streets and highways, bicycle parking and storage, signal timing to improve street and highway intersection operations, and the related signage for bicycles, pedestrians, and vehicles.

HEALTH IN ALL POLICIES (HiAP): The Active Transportation Plan promotes the following Health in All Policies Conditions:

Health and Wellness: Planning for and creating places for people to walk and bike fosters health and wellness across the community.

Healthy Environments: The Active Transportation Plan aims to increase the proportion of trips made by walking and biking. This supports the Climate Action Plan and assists in reducing the climate impacts of vehicle emissions from the transportation sector.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: The revised total value of the contract will be reduced to $53,186. This project is grant funded from the California Department of Transportation. The matching funds requirement is met by staff time working on this effort. There is no impact to the General Fund.

Prepared By:

Claire Gallogly
Principal Transportation
Planner
Submitted By:

Nathan Nguyen, P.E.

Director of Public Works
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. ECOLOGY ACTION CONTRACT AMENDMENT 1.DOCX

11.2 _______________ Amendment to Professional Services Agreement for ___________ February, 2025 Page 1

FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT WITH _________________
THIS First AMENDMENT (“First Amendment”), effective as of _________, (“effective date”) to the PROFESSIONAL SERVICES AGREEMENT dated May 1, 2024, is made by and between the CITY OF SANTA CRUZ (“City”) and Ecology Action of Santa Cruz (“Consultant”). City and Consultant may be referred to individually as a “Party” and collectively, as the “Parties.”

RECITALS
WHEREAS, City and Consultant have previously entered into that certain Professional Services Agreement (“Agreement”) dated May 1, 20024, incorporated herein by this reference; WHEREAS, City and Consultant desire to enter into this First Amendment to the Agreement to Revise the Scope of Work and Fee Schedule as specified herein.

AGREEMENT
NOW, THEREFORE, it is agreed between the Parties to incorporate the above Recitals hereto, and that the Agreement is hereby amended as follows:

1. Scope of Work of the Agreement is hereby amended to revise the prior Scope of Work in Exhibit A of the Agreement with the amended Scope of Work, which is attached hereto as Exhibit A-1 and incorporated herein.

2. Budget-the revised Not to Exceed Amount for this contract is $53,186 Notwithstanding these amended terms of the original Agreement by this First Amendment, all other applicable terms and conditions of the original Agreement and attachments[, and other prior amendment(s),] shall remain in full force and effect. The terms of this First Amendment shall control if any conflict exists.

Each party acknowledges that it has reviewed this First Amendment and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this First Amendment.

The unenforceability, invalidity or illegality of any provision(s) of this First Amendment shall not render the other provisions unenforceable, invalid or illegal.

The Parties may execute this First Amendment in two or more counterparts, which shall, in the aggregate, be deemed an original but all of which, together, shall constitute one and the same instrument. A scanned, electronic, facsimile or other copy of a party’s signature shall be accepted and valid as an original.

11.3 _______________ Amendment to Professional Services Agreement for ___________ February, 2025 Page 2
The signatories to this First Amendment warrant and represent that each is authorized to execute this First Amendment and that their respective signatures serve to legally obligate their respective representatives, agents, successors and assigns to comply with the provisions of this First Amendment.
[SIGNATURES ON FOLLOWING PAGE]

11.4 _______________ Amendment to Professional Services Agreement for ___________ February, 2025 Page 3
IN WITNESS WHEREOF, the City and the Consultant have executed this ____________ Amendment effective as of the date first written above.

Approved As To Form:

By: ______________________________ Date: ___________
Office of the City Attorney

CONSULTANT
By: ______________________________ Date: __________________ Printed: __________________________ Title: _________________________

CITY OF SANTA CRUZ
By: ______________________________ Date: __________________ Matt Huffaker, City Manager

11.5 _______________ Amendment to Professional Services Agreement for ___________ February, 2025 Page 4
Exhibit A-1
Amendment 1 Scope of Work
Summary of Project Tasks
Task 1: Engagement Plan
Participate in Development of an Engagement Plan:
 Contribute to an engagement plan to reach a diverse cross section of the community with a multi-tiered approach including:
o a focus on underserved populations
o establishing a technical advisory committee of partner agencies o convening focus group meetings with community advocacy groups that represent a diverse pool of interests such as pedestrians and bicyclists, elderly and disabled, environmental, youth, health, business, and neighborhood groups
o soliciting input from the general public
 Identify representatives of underserved populations to support engagement and engage with trusted messengers
 Utilize existing relationships with NGO groups that work in underserved communities, including Nueva Vista Community Resources, Second Harvest Food Bank, Senior Centers, Veterans Services, Homeless Services, and others.

Attend farmers markets, service agencies, and other venues. Post materials English and Spanish.
 Determine a list of community groups and identify representatives.  Set up a schedule for the full list of engagement strategies based on key milestones of the project including identifying active transportation need, developing the project list and priority order, and seeking input on the draft plan.
 Assist with development of specific strategies to reach underserved community residents who are too often left out of transportation planning discussions.

Create Project Website
• Develop and host a bilingual project website to share information about the Plan development process, promote outreach events, and host the community survey and map (map from Toole), as well as allow members of the public to view and provide feedback on various aspects of the Plan. ‘
•Regularly update website with content from City and Toole Budget: $7,280

11.6 _______________ Amendment to Professional Services Agreement for ___________ February, 2025 Page 5
Spent through 12/31/2024: $5,112.98
Remaining: $2167.02
Task Deliverables
Stakeholder Engagement Outreach Plan
Project website
Task 2: Engagement with Underserved Populations
Participate in Non-Traditional and Underserved Engagement Meetings  Assist in identification of specific areas of the City with underserved populations based on a variety of factors including income, minority, age, housing security, access to vehicle
 As determined in the Engagement Plan, consider targeted outreach events to reach underserved communities in the City of Santa Cruz. These outreach activities will utilize methods to engage with the target communities, including being bilingual and culturally competent.
 Assist with up to eight pop-up style outreach events in neighborhoods, at community-based organizations, and through existing relationships with community leaders to achieve trust and deeper outreach opportunities with underserved communities to ensure they fully share in the benefits of this Plan.

Attending existing gatherings is critical for engaging a broad and diverse range of people living and working in Santa Cruz.
o This includes:
 identification of outreach events with consideration for project schedule
 coordination and scheduling of events, including direct coordination with site locations and staff as needed.
 Provision of a outreach event calendar for team use listing dates, times, locations, and groups
 set up and take down of supplies and materials
 bilingual staff for community engagement.
 A summary of input received by event
 Utilize the Beach Flats Community liaison to engage with this area of the City that has the lowest income population and limited English proficiency

11.7 _______________ Amendment to Professional Services Agreement for ___________ February, 2025 Page 6
 Participate in a minimum of 3 meetings at key milestones of project including project introduction and existing conditions, project list development, and draft ATP.

Budget: $9,215
Task Deliverables
Schedule of Engagement
Summary of Input Received
Task 4: Public and Community Groups Engagement
Focus Groups to Engage Community Organizations
 Set up a series of focus group meetings with community advocacy groups that represent a diverse interests such as pedestrians and bicyclists, elderly and disabled, environmental, youth, health, business, and neighborhood groups.

Meetings will be organized in partnership with community organizations and align with existing meetings or gathering places where possible. These interviews will be focused on current barriers to active transportation and gather recommendations on meaningful education and encouragement programs that would enable each group to walk and bike more frequently and more safely
 Schedule and provide staff support for 1-3 meetings for each focus group at key milestones of project including identifying active transportation needs and development of project list, and draft ATP.
 This includes:
 identification of groups with consideration for project schedule  coordination and scheduling of events, including direct coordination with site locations and staff as needed.
 Provision of a focus group calendar for team use listing dates, times, locations, and groups
 set up and take down of supplies and materials
 bilingual staff as needed.
 A summary of input received by event
 Review and analyze comments from the Focus Groups to help determine the active transportation needs, the project list, priority order, and provide input on the draft ATP.
 Toole will create content and provide direction for all meetings.

11.8 _______________ Amendment to Professional Services Agreement for ___________ February, 2025 Page 7
Support Public Meetings
 Support a minimum of two public meetings bringing residents of the community together to provide input at key milestones of the project. This includes:
o Scheduling of meetings in consultation with City and Toole. Meetings will be in a location that is convenient to residents throughout the City and ensure that it is accessible via multimodal transportation. Meetings will be held on days and times that will provide the greatest level of participation.
o Hosting web based engagement on the project site to improve awareness. This includes the online mapping tool on the project site to improve participation. Online mapping tool will be created and provided by Toole. Static information used for in person events may also be provided online. Online content will be created and provided by Toole.
o Assistance with set up and take down of event
o Provide bilingual staff for translation for non-English-speaking audience members.
o A summary of input received by event
 Key milestones of project include development of project list by identifying active transportation needs and draft ATP.

Support Regular Project Updates
 In coordination with Toole, support public awareness of project via regular project updates and meeting notices. These may be through social media posts, electronic newsletters, press releases and email notifications to distribution lists
 The project website will be updated regularly using Toole created content to show progress on this project, next steps for completion, and ways to provide input.

Review & analyze public comments from a variety of sources  Review, categorize, and analyze public comments from ann engagement activities and public feedback, including online comment tool, to summarize public input and priorities. Public comments will be incorporated into the final ATP and help determine the ATP prioritized project list. This task will be incorporated in to the draft and final plans as an appendix (Task 7) Budget: $28,128

11.9 _______________ Amendment to Professional Services Agreement for ___________ February, 2025 Page 8
Spent through 12/31/2024: $1,720.72
Remaining: $26,407.28
Task Deliverables
List and Schedule of outreach events
Summary of input received
Task 6: Identification of Active Transportation Needs and Project List

1.Review list of programs and projects for improvements  Review proposed project list for congruence with public outreach process findings.
 Contribute to list of non-infrastructure and education/encouragement program recommendations
 Through all improvements, utilize Vision Zero, Health in All Policies, and Climate Action and Adaptation lenses.

Prioritization of Project List and Implementation Planning  Assist with development of evaluation criteria and scoring for non-infrastructure recommendations and assist with creation of prioritized list of recommendations.

Budget: 5,999
Task Deliverables
Non-infrastructure recommendations
Evaluation criteria for non-infrastructure recommendations Task 7: Develop Santa Cruz Active Transportation Plan Update-Draft and Final Contribute to Draft Plan
 Review Toole prepared draft Active Transportation Plan for the City of Santa Cruz detailing current bike and walking conditions, barriers, and solutions. o A list of potential IN solutions will be developed with input from Ecology Action.

11.10 _______________ Amendment to Professional Services Agreement for ___________ February, 2025 Page 9
o Ecology Action will provide an appendix highlighting outreach and engagement work with underserved communities, community organizations and the public and resulting ATP recommendations.

Review Draft Plan
 Review draft plan with Toole and City to assure best practices are applied, Plan reflects the plan process work and is implementation ready.

Final Plan
 The Final Plan will be posted to the project website.

Budget: $2,564

2. Task Deliverables
Draft Plan comments
Summary of comments from stakeholders and public
Final Plan posted to website

11.11 City Council

AGENDA REPORT
DATE: 02/20/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Public Works
SUBJECT: Monterey Bay Sanctuary Scenic Trail (Rail Trail) Segment 7 Phase II Project (c401413) – Budget Adjustment (PW)
LOCATION: Districts 3 and 4
RECOMMENDATION: Motion to adopt a resolution amending the FY 2025 budget to appropriate funds in the amount of $900,000 from Measure D to the Monterey Bay Sanctuary Scenic Trail (Rail Trail) Segment 7 Phase 2 (c401413).

BACKGROUND: The Rail Trail Segment 7 Phase II (c401413) is a 0.8 mile long paved bicycle and pedestrian path between the intersections of Bay Street at California Street and Pacific Avenue at Beach Street. The project will connect to the recently completed Coastal Rail Trail Segment 7 Phase I, which serves over 800 active transportation users per day with a 12-16 foot wide paved trail on the coastal side of the railway. Together Phase I and Phase II create 2.1 miles of the Coastal Rail Trail spine between Natural Bridges Drive and Pacific Avenue at the Santa Cruz Municipal Wharf. The two-phase trail will connect over 30,000 residents who live within one mile of the project to schools, work, beaches, shopping and other activity centers.

At its January 26, 2021 meeting, City Council approved the plans and specifications for the Monterey Bay Sanctuary Scenic Trail (Rail Trail) Segment 7 Phase II Project, authorized staff to advertise for bids, and directed the City Manager to execute the contract in a form approved by the City Attorney.

On April 21, 2022, the project was awarded to the lowest responsive and responsible bidder Anderson Pacific Engineering Construction, Inc. (Santa Clara, CA) in the amount of $11,395,666.80 (including 5% contingency).

At its November 28, 2023 meeting, City Council approved a resolution amending the FY 2024 budget to appropriate funds in the amount of $2,950,000 from Wastewater enterprise (m409659) and Measure D portions of Rail Trail Segment 8 & 9 (C401804), Pavement (c400809), Pavement (c400810), Bay Drive (c402304), to Monterey Bay Sanctuary Scenic Trail (Rail Trail) Segment 7 Phase II Project (c401413).

Since the last council update, work has progressed on the trail, and is nearing completion, but another year of wet weather and construction impacts have increased the cost of the project.

12.1 DISCUSSION: Due to a second consecutive year of extreme winter events in 2023/2024, and additional work needed to address design conflicts along the proposed trail, the project has experienced over six months of delay and is anticipated to incur $900,000 dollars of extra cost.

The site is situated adjacent to Neary Lagoon and is inundated with groundwater during and after rain events. These site conditions have contributed to design modifications that require the removal or stabilization of soils to build the trail and adjacent retaining walls. These conditions are often uncovered during construction and made worse by rainfall.

A major unanticipated cost was the construction of a concrete cutoff wall at the eastern end of the project. The wall was required to limit groundwater so the soil could be adequately compacted to sustain the asphalt path. The groundwater, blocked by the cut-off wall, is now routed into a modified storm drain system. This effort required design and construction of elements not originally anticipated in the design contract. Additionally, the prior storm events have resulted in extensive erosion of the hillside on the coastal side of the trail. That has resulted in the need for additional backfill behind the retaining wall system.

The additional time required to complete the above unforeseen conditions on the project has also increased the costs of flagging for railroad operations, construction management, and engineering and design support. The funds allocated at the November 2023 budget adjustment have been insufficient to cover the high costs of building a new wall and modifying the storm drain system as described above. This adjustment will ensure the project can be completed this spring.

Furthermore, the project will install 15 security cameras along the length of the new rail trail (Segment 7 Phase 2) after construction is complete. This work will be coordinated with the City of Santa Cruz Information Technology Department, Fire Department, Police Department, and Public Works Department. The cost of installing the 15 security cameras is included in the budget adjustment.

The budget adjustment allocates funds from Measure D, a local source for transportation project funding. If less funds are required, they will remain usable by other Measure D eligible projects.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: On April 19, 2019, the Planning Commission approved the Mitigated Negative Declaration, Mitigation Monitoring and Reporting Program, Coastal Permit, Design Permit and Slope Modification/Variance and Heritage Tree Removal Permit for the Rail Trail Segment 7 Phase II project. A Mitigated Negative Declaration (MND) was adopted for the project on June 11, 2019, and a Notice of Determination was filed with the County Clerk of Santa Cruz County on June 13, 2019.

HEALTH IN ALL POLICIES (HiAP): The Monterey Bay Sanctuary Scenic Trail (Rail Trail) Segment 7 Phase II project promotes the following HiAP Conditions:

Health and Wellness – The Rail Trail Segment 7 Phase II project promotes behaviors that maintain or improve health by providing a new venue to promote the use of “active living” transportation modes, such as walking and biking, and decreasing single-occupancy vehicle trips.

Also, the General Plan calls for a “citywide interconnected system of safe, inviting, and accessible pedestrian ways and bikeways” (Goal M4).

12.2 Heathy Environments – The Rail Trail Segment 7 Phase II project promotes reduction of greenhouse gas emissions, which will be achieved largely by providing safe paths for low-carbon transportation options as an alternative to single-occupancy vehicle trips.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: Yes

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: A budget adjustment for project c401413 is needed for $900,000 dollars to complete the project. The proposed budget adjustment will be funded through the local Measure D funds. The funding change within Measure D will not eliminate planned projects; they will be funded by other sources instead or deferred to later years. There is no impact to the General Fund.

Prepared By:

Ricardo Valdes, P.E.

Senior Professional Engineer
Submitted By:

Nathan Nguyen, P.E.

Director of Public Works
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. BUDGET ADJUSTMENT.PDF

12.3 City of Santa Cruz

BUDGET ADJUSTMENT REQUEST
$GPLQLVWUDWLYH$SSURYDO
)LVFDO<HDU

ACCOUNT 352-(&71$0(
LIDSSOLFDEOH
255(9(18($&&28177,7/(
ACCOUNT 352-(&71$0(
LIDSSOLFDEOH
25EXPENDITURE ACCOUNT TITLE
NET: $

REQUESTED BY DEPARTMENT HEAD

APPROVAL

BUDGET/ACCOUNTING
5(9,(:('

FINANCE DIRECTOR

APPROVAL

CITYMANAGER

APPROVAL
5HVR

352-(&7
352-(&7
$02817
$02817
&RXQFLO$SSURYDO

TOTAL EXPENDITURE

TOTALREVENUE
'DWH

1VSQPTF
3FWJTFE/PWFNCFS
 Clear Form
2025
02/06/2025
To cover additional construction costs to complete Segment 7 Rail Trail project. 311-00-00-0000-49169 c401413 956-5019-0 From 2016 Transportation Measure D 900,000 MB Sanctuary Scenic Trail Seg 7
900,000
311-40-64-9330-57307 c401413 100-2020-0 Pedestrian/bike systems 900,000 MB Sanctuary Scenic Trail Seg 7
224-00-00-0000-59103 To General CIP Fund 900,000
1,800,000
-900,000
Shelley
Horrow
Digitally signed by
Shelley Horrow
Date: 2025.02.06
10:24:19 -08'00'
Nathan N.

Nguyen
Digitally signed by
Nathan N. Nguyen
Date: 2025.02.19
22:51:44 -08'00'
Emily
Burton
Digitally signed
by Emily Burton
Date: 2025.02.23
18:32:59 -08'00'
Elizabet
h Cabell
Digitally signed by
Elizabeth Cabell
Date: 2025.02.24
15:06:18 -08'00' 12.4
City Council

AGENDA REPORT
DATE: 02/20/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Public Works
SUBJECT: Measure E Oversight Committee (PW)
LOCATION: Citywide
RECOMMENDATION: Motion authorizing the Mayor to appoint Water Commissioner Julianne Rhodes, and Transportation and Public Works Commissioners Susan Gilchrist and Ron Goodman to serve on the Measure E Oversight Committee.

BACKGROUND: The Clean River, Beaches, and Ocean tax, also known as Measure E, was approved by City voters in the November 2008 general election. The funds generated from this tax are dedicated to running the City’s stormwater management program, which includes maintaining and improving stormwater systems, conducting water quality monitoring, and ensuring stormwater permit compliance with the State Water Resources Control Board. This special purpose property tax generates approximately $650,000 annually via a flat charge per parcel citywide. Included in Measure E is a provision that calls for an independent oversight committee to convene and review the use of the tax proceeds. The committee was historically comprised of two members from the Transportation Public Works Commission and one member from the San Lorenzo River Committee. Meetings were held at least once a year to review the fund’s proposed expenditures with Public Works Department staff.

In 2020, the Measure E Oversight Committee ceased meeting due to the pandemic. Additionally, the San Lorenzo River Committee has since been dissolved. To catalyze the revival of the Measure E Oversight Committee, Public Works staff attended the December 9, 2024 Water Commission meeting to recommend a Water Commissioner participate in this committee. The Water Commission then nominated Julianne Rhodes. On January 27, 2025, the Transportation and Public Works Commission nominated two of their own members: Susan Gilchrist and Ron Goodman.

DISCUSSION: The Clean River, Beaches, and Ocean Tax Ordinance (No. 2008-21) calls for an oversight committee to review the use of the Tax Proceeds. Public Works staff recommend the Mayor appoint the nominated members from both the Water Commission and the Transportation and Public Works Commission so the Measure E Oversight Committee may continue its duty to help review the use of Measure E Tax Proceeds.

13.1 The Measure E Oversight Committee is a working group and not a standing committee.

Therefore, there are no conflicts with the members serving on this committee in addition to their respective advisory bodies.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: This is not a project under CEQA.

HEALTH IN ALL POLICIES (HiAP): This program promotes the following Health in All Policies Conditions: The revival of the Measure E Oversight Committee contributes to the Healthy Environments pillar of Health in All Policies Conditions. It addresses the CORE Community Indicators of “Concern for the environment” and “Environmental stewardship.” FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: There is no impact to the General Fund.

Prepared By:

Jessica Juico
Environmental Programs
Analyst II
Submitted By:

Nathan Nguyen, P.E.

Director of Public Works
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. CLEAN RIVER, BEACHES AND OCEAN TAX ORDINANCE.PDF

13.2 13.3

13.4 13.5

13.6 13.7
City Council

AGENDA REPORT
DATE: 02/20/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Public Works
SUBJECT: Resource Recovery Facility Enclosed Flare Installation Project (c402512) – Authorization to Ratify Purchase Order (PW)
LOCATION: District 6
RECOMMENDATION: Motion to ratify purchase order for the direct purchase of the enclosed flare, related equipment, shipping and startup with Perennial Energy LLC (West Plains, MO) at the Resource Recovery Facility in the amount of $1,023,314.01, in a form approved by the City Attorney. The Public Works Director is authorized to execute change orders within the approved project budget.

BACKGROUND: On August 13, 2024, City Council authorized the execution of Contract Amendment No. 7 with Tetra Tech BAS (TTBAS) for engineering and material purchase services for the Resource Recovery Facility Enclosed Flare Installation Project (c402512) in the amount of $1,785,870. In order to meet the aggressive deadline set by the Monterey Bay Air Resources District (MBARD) to submit a design by September 6, 2024, the contract included providing preliminary design for the application as well as procurement of the flare on behalf of the City. TTBAS put together a design for the flare and issued a request for proposals resulting in quotes from three vendors for the City’s selection.

DISCUSSION: TTBAS obtained bids in November 2024, with Perennial Energy LLC. (PEI) being the lowest bidder for the equipment option that met the City’s needs. PEI’s equipment cost is $1,023,314.01. The TTBAS contract included a 15% markup on the price of the flare, which is standard for these types of contracts. However, due to the large dollar value of the flare, the standard markup of 15% would result in an additional $150,000 project cost. To avoid the 15% markup costs, staff recommends reallocating funds from the TTBAS purchase order to purchase directly from PEI resulting in a savings of approximately $150,000. A separate procurement will occur to select a contractor to unload and install the flare once fabricated and shipped to the landfill.

Per Section 3.08.150 of the Purchasing Ordinance, staff submitted the Single Source justification to the Purchasing Manager on January 23, 2025, and was given approval to direct purchase the enclosed flare given the cost savings and time constraints of the project. PEI provided the lowest cost proposal for the enclosed flare. Staff finds PEI’s cost proposal reasonable amongst limited number of known vendors who fabricate enclosed flare systems. There is an urgent timeline to

14.1 install the permanent enclosed flare as the temporary open flare is operating under a variance that will expire on May 10, 2025. Staff is preparing to request an extension from MBARD while the permanent enclosed flare design is finalized and manufactured, however, time is of the essence.

The current target schedule is to complete all work by December 2025. Once the enclosed flare is installed the City will be in full compliance with California Air Board regulations and expect smooth operations and management of landfill gas into the future.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: A Notice of Exemption will be prepared for the installation of the permanent enclosed flare.

HEALTH IN ALL POLICIES (HiAP): This program promotes the following Health in All Policies Conditions: The Enclosed Flare Installation Project contributes to the Healthy Environments pillar of Health in All Policies Conditions. It addresses the CORE Community Indicators of “Concern for the environment” and “Environmental stewardship” by reducing health and safety risk associated from uncollected landfill gas and ensures responsible, mandated management.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: Funds are available in the Refuse Enterprise Fund in the FY 2025 Capital Improvement Program (CIP) project c402512. There is no impact to the General Fund.

Prepared By:

Hoi Yu
Associate Professional
Engineer
Submitted By:

Nathan Nguyen, P.E.

Director of Public Works
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. SINGLE SOURCE MEMO.PDF

14.2 Memorandum
To: Finance Department, Purchasing Division
From: Hoi Yu, Associate Professional Engineer
Date: January 23, 2025
Public Works Department
809 Center Street, Room 201
Re: Single Source Justification for Directly Purchasing Low NOx Flare from Perennial for the Enclosure Flare Installation Project at the RRF The Landfill gas-to-energy (LTE) facility, owned and operated by Opal Fuels, was forced to shut down following a severe wind event in February 2024 that damaged PG&E’s electrical infrastructure. Damage to PG&E’s electrical infrastructure prevented landfill gas (LFG) generated electricity from being delivered to the grid, inadvertently disrupting the collection and destruction of LFG at the landfill. Given the potential environmental and health and safety risks associated with uncollected LFG, the City was required to promptly resume the collection and control of LFG at the Landfill.

The City took immediate action and worked with the landfill’s contracted consulting engineering firm, Tetra Tech BAS (TTBAS), to start researching, identifying, obtaining quotes, and evaluating rental options for temporary LFG destruction devices. Upon determining an open flare was the most cost effective and quickest option for the landfill to get back into compliance, TTBAS assisted the City to obtain approval from the Monterey Bay Air Resources District (MBARD) to operate a temporary open flare LFG destruction device to resume LFG collection and destruction and bring the landfill back into compliance.

The temporary open flare was meant to be a short term backup system to continue collecting and destroying landfill gas when the LTE plant was down. If the landfill fails to collect and destroy landfill gas continuously, it is a clean air act violation. If the landfill does not have this backup any time the plant is down, it would be a repeat violation, which will cause the penalty fee to increase.

Permanent open flares are prohibited in California, but given the potential environmental and health and safety risks associated with uncollected LFG, MBARD gave the City approval to operate the temporary open flare until May 10, 2025. One of conditions of approval was to apply for a permanent enclosed flare by September 6, 2024. TTBAS was contracted to meet this tight deadline and provide a preliminary design for the permanent flare application as well as procure the flare on behalf of the City. TTBAS put together a design for the flare and issued a request for proposal resulting in quotes from 3 vendors for the City’s selection.

14.3 TTBAS obtained bids in November 2024, with Perennial Energy LLC. (PEI) being the lowest bidder for the equipment option that met the City’s needs. PEI’s equipment cost is $1,023,314.01. The TTBAS contract included a 15% markup of the flare’s price which is standard for markups on materials and equipment for these types of contracts. However, due to the large dollar value of the flare the standard markup of 15% would result in a $150,000 extra project cost. To eliminate markup costs, staff recommends reallocating funds from the TTBAS purchase order to make a direct purchase from PEI resulting in a savings of approximately $150,000 through avoidance of the 15% markup. A separate procurement will occur to select a contractor to install the flare once fabricated and delivered to the landfill.

Reason for Non-competitive Agreement
There is an urgent timeline to install the permanent flare as the temporary flare is operating under a variance that will expire on May 10, 2025. Staff is preparing to request an extension from MBARD while the permanent flare design is finalized then manufactured, time is of the essence. The current target schedule is to complete all work by December 2025.

Price Reasonableness Analysis
PEI provided the lowest cost proposal for the enclosed flare. The price comparison to the other vendors is listed in Table 1 below. Staff finds PEI’s cost proposal reasonable amongst limited number of know vendors who fabricate enclosed flare systems.

Table 1 – Vendor quotes obtained by consultant
Vendor Option Cost
Perennial Energy LLC.
(PEI)
Continental - Three
(3) multi-stage
centrifugal blowers 50
HP at 500 scfm and
three (3) 50 HP VFDs
$ 1,023,314.01
John Zink Company, LLC.

Three (3) multi-stage
centrifugal blowers 20 HP
at 500 scfm and three (3)
40 HP VFDs
$ 1,369,564.00
Cimarron Energy, INC.

Three (3) multi-stage
centrifugal blowers 20 HP
at 500 scfm and three (3)
20 HP VFDs with a 30
HP Rotary Screw Air
Compressor rated for 142
cfm at 100 psig. $ 1,211,250.00

14.4 City Council

AGENDA REPORT
DATE: 02/20/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Public Works
SUBJECT: West Cliff Drive Bethany Curve Culvert Project (c402407) - Authorization to Ratify Purchase Order (PW)
LOCATION: District 6
RECOMMENDATION: Motion to ratify purchase order for additional work as outlined in the latest proposal from Pacific Crest Engineering (PCE) dated November 2024 for the West Cliff Drive Bethany Curve Culvert Project (c402407) and authorize the City Manager to execute the contract amendment in a form approved by the City Attorney. The Public Works Director is authorized to execute change orders within the approved project budget.

BACKGROUND: The declared disasters of early 2023 and 2024 rought tremendous damage to the revetment along West Cliff Drive and in eight locations (opposite the addresses of 920, 932, 944, 960, 1016, 1030, and 1110 as well as the Bethany Culvert viaduct structure). As a result of impacts to the path and roadway from the damage in these locations, and because West Cliff Drive is a Federal Aid Route, these projects were authorized by Caltrans and the Federal Highway Administration (FHWA) to receive Emergency Opening (EO) funds. Due to the nature of the emergency, the City was advised to bid out the repair projects as quickly as possible with whatever level of design that could be produced in an expedited manner. As such, the design consultants, including Pacific Crest Engineering (PCE), have had a much larger role during construction than would be seen in more traditional design-bid-build project delivery as the designs are continually evolving to address site conditions as they are discovered.

DISCUSSION: Pacific Crest Engineering (PCE) was hired as the geotechnical design consultant for these projects and was subsequently retained to provide ongoing construction support. The scope of these projects was as well defined as the expedited plan set could anticipate, but due to changing site conditions and an evolving design approach, PCE now requires an augmentation of their existing purchase order #62-24070 (currently at $86,620). The proposal from PCE anticipates an additional $72,570 above the current purchase order to provide the necessary services to complete the projects, resulting in an amended contract of $159,190.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: This is not a project under CEQA

15.1 HEALTH IN ALL POLICIES (HiAP): HiAP is a collaborative approach to improving community well-being by prioritizing equity, public health and sustainability considerations into decision-making across sectors and policy areas. The actions recommended herein support the pillar of public health by increasing life safety outcomes for transportation and roadway users. It contributes to the HiAP Collective of Results and Evidence-based Investments Condition of a safe and just community and related community well-being outcome metrics.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: Amendment one would increase the contract with PCE by $72,570. Funds are available in the Public Works Capital Investment Program (CIP) project c401501. The FHWA EO funding will cover 88.53% of the total project costs, with the City match primarily coming from Gas Tax revenues. There is no impact to the General Fund.

Prepared By:

Miguel Lizarraga
Associate Engineer
Submitted By:

Nathan Nguyen, P.E.

Director of Public Works
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. SCOPE AND FEE MEMO.PDF

15.2 G E O T E C H N I C AL | E N V I R O N M E N T AL | C H E M I C AL | M AT E R I AL T E S T I N G | SP E C I AL I N S P E C T IO N S 444 AIRPORT BLVD., SUITE 106 | WATSONVILLE, CA 95076 | PHONE 831 -722-9446 | WWW.4PACIFIC-CREST.COM

AUTHORIZATION TO PERFORM ADDITIONAL SERVICES
Client: City of Santa Cruz
Attention: Josh Spangrud
Client Address: 809 Center Steet, Room 201
City PO No.: 62-24070
PCE Project No.: 2338
Project Name: Bethany Culvert Storm Damage Repair
Project Location: West Cliff Dive at Woodrow Avenue
Date: November 5, 2024
ADDITIONAL SCOPE OF WORK:

Our continued geotechnical support to the Bethany Culvert Storm Damage Project will include the following services:
• Provide geotechnical consultation and recommendations to address emerging field issues. • Geotechnical review of contractor RFI’s and submittals. • Attend project meetings and provide consultation and support as needed. • Project administration and management.
• Perform geotechnical observation and compaction testing activities. • Perform concrete sampling and testing services.
• Preparation of daily field reports summarizing the results of our daily observation and testing activities.
• Report and letter preparation documenting our observation and testing services on the site.

FEES
Our fees for additional services will be calculated on a time and materials basis based on the hourly rates provided in our current schedule of charges. Based upon our understanding of the ongoing work, attached is a spreadsheet outlining the estimated hours and associated rates. Our fee for continued construction phase support is roughly estimated at $72,570.00. Considering our original authorization $86,620 (P.O. 62-24070), this increase would bring our total authorization to $159,190.00.

The exact services shown, and the scope of each task may change in response to changes in the design, construction issues, or other issues outside of our control which may occur. This includes weather issues, means and methods for completion of the work chosen by the Contractor, unforeseen

15.3 Bethany Culvert Storm Damage Repair Projectl No. 2338 November 5, 2024

Page 2 ends

geotechnical conditions, etc. In conjunction with a varying scope and extent of our services, the fees for our services may be less than or greater than those estimated in this authorization.

AUTHORIZATION
To authorize our firm to provide these services, please send written authorization to proceed as soon as possible.

Pacific Crest Engineering Inc. appreciates the opportunity to provide our services, and would be pleased to answer any questions you may have about our proposed scope of work and fee. We can be reached at (831) 722-9446.

Sincerely,
PACIFIC CREST ENGINEERING INC.

Matt Maciel, PE, GE
Principal Geotechnical Engineer
G.E. 3189/Exp. 9/30/2026
Attachment: Opinion of Probable Cost

15.4 PROJECT:

Santa Cruz, CA
DATE:

Geotechnical/Geological Consultation
Principal Engineer/Geologist 60 hours @ 220 $/hour $13,200 RFI & Submittal Review
Principal Engineer/Geologist 8 hours @ 220 $/hour $1,760 Meetings
Principal Engineer/Geologist 24 hours @ 220 $/hour $5,280 Administrative Services
Principal Engineer/Geologist 16 hours @ 220 $/hour $3,520 Administrative Staff 24 hours @ 100 $/hour $2,400
Phase Subtotal $26,160
Observation/Testing During Grading & Shoring Operation
Senior Field Engineer 50 days @ 4 hours/day @ 145 $/hour $29,000 Compaction Curves 8 curves @ 325 $/Curve $2,600
Concrete Sampling and Testing
Senior Field Engineer 12 days @ 4 hours/day @ 145 $/hour $6,960 Compressive Strength 12 sets @ 350 $/set $4,200
Storage & Disposal Fee 12 sets @ 25 $/set $300
Progress Report
Principal Engineer 4 hours @ 220 $/hour $880
Senior Field Engineer 6 hours @ 145 $/hour $870
Administrative Staff 16 hours @ 100 $/hour $1,600
Phase Subtotal $46,410
Post Report/Pre-Constructions Services $26,160.00
Construction Phase Services $46,410.00
Total Request for Authorization Increase $72,570.00
TOTALS

CONSTRUCTION PHASE SERVICES - PREVAILING WAGE PROJECT
Bethany Culvert Storm Damage Repair
November 5, 2024

ADMINISTRATION, TECHNICAL REVIEW, CONSULTATION, AND MEETINGS

CONSTRUCTION OBSERVATION AND TESTING

15.5 City Council

AGENDA REPORT
DATE: 02/18/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Water
SUBJECT: Modifications to City Council Forest Management Policies for Water Department Watershed Lands (WT)
LOCATION: Citywide
RECOMMENDATION: Motion to repeal City Council Policy 11.3 - Timber Harvests in Watershed Area and Preservation of Old Growth Trees, and replace with City Council Policy

11.3 – Forest Management of Water Department Watershed Lands, which includes a) additional old growth tree characteristics that will facilitate their protection and b) the ability to commercialize forest products in alignment with c) the requirement to reinvest revenue from such commercialization into other Water Department watershed restoration work.

BACKGROUND: The City of Santa Cruz Water Department (Water Department) manages nearly 4,000 acres of property in the San Lorenzo River and Laguna Creek watersheds for the purposes of drinking water source protection. Forest management is of the utmost importance in the Water Department’s efforts to protect its drinking water supplies.

During the early twentieth century, most of the City’s watershed properties were clearcut by previous owners, resulting in regrowth of vegetation that is significantly denser and more prone to catastrophic wildfire. Since the City began acquiring these properties—an effort largely initiated in the 1950s—the Water Department has applied several strategies to manage forest health, including conifer and hardwood thinning, dead and dying tree removal, invasive/exotic weed removal, ladder fuel removal along key fire breaks and access routes, and coordination with fire agencies on training, access, and infrastructure needs.

City Council Policy 11.3 -Timber Harvests in Watershed Area and Preservation of Old Growth Trees (1998), provides criteria for identifying and protecting old growth trees. However, these criteria no longer align with contemporary forest health standards. For example, second and third growth trees would be mischaracterized as old growth solely based on their large trunk diameter.

As a result, the historic approach presents a fundamental challenge to forest management and overall forest health because large, but not necessarily old growth trees, cannot be cut even if forest health goals would benefit from it. Recognizing this, Water Department staff embarked on studies to determine if more widely accepted characteristics of old growth trees, reflected in contemporary forest health standards, should be incorporated into the City’s forest management policy.

16.1 In 2019, the Water Department hired Sicular Environmental Consulting and Natural Lands Management (Sicular) to evaluate opportunities and constraints for improved forest management to ensure forest health on the City’s watershed lands.

In 2021, the Water Commission supported a staff recommendation, based on the report from Sicular, to explore the Integrated Production and Restoration forest management alternative. This alternative places more focus on fuel management and restoration with limited commercial timber harvest. More details can be found in the October 4, 2021 Water Commission Watershed Lands Forest Management Update:
https://www.cityofsantacruz.com/home/showpublisheddocument/86410/637686001735000000 Following the October 2021 Water Commission meeting, the Department contracted with Auten Resource Consulting (ARC) to operationalize the broad recommendations of the Integrated Production and Restoration alternative. ARC recently provided its final report, Newell Creek Watershed Forest Stewardship Recommendations (Auten Resource Consulting 2024), available at:
https://www.cityofsantacruz.com/home/showpublisheddocument/102183. The recommendations include a range of forest management activities such as forest density reduction/large tree restoration, and forest health fuels reduction. Staff returned to the Water Commission in November of 2024 and February of 2025 to present these recommendations for discussion. The Commission supported the changes and requested staff report back during the budget process with details on how any revenue generated from this work would be allocated.

DISCUSSION: Forest health and drinking water source protection have always been the primary motivating factors for the management of Water Department watershed properties.

However, to carry out the recommendations contained in the Sicular and ARC studies, staff recommend that Council Policy 11.3 be amended to align with modern forest practices.

Proposed modifications to Council Policy 11.3 will create the policy language needed to perform the forest management work as described in the Integrated Production and Restoration alternative and ensure that any revenue generated is reinvested back into the watershed properties.

Below is the existing and proposed policy language.

Existing language:

Council Policy 11.3
Timber Harvests in Watershed Area and Preservation of Old Growth Trees Policy Timber Harvests
City staff will notify the Council of any requests for timber harvest permits, which would have the potential to cause negative impact in the City's watershed area.

16.2 Preservation of Old Growth Trees
The City Council of the City of Santa Cruz hereby declares it to be its policy that old growth trees and specimen trees on City-owned forest lands are to be preserved unless safety factors dictate their removal, or if the Council makes a specific exception.

Further, it is the policy of the City Council that residual trees will be harvested only in cases where silvicultural guidelines indicate their harvest would benefit the health and vigor of the stand, or if safety or extraneous factors dictate their removal.

For the purposes of this policy, the following definitions will apply:
“Old Growth Tree” means a tree which is at least 40 inches in diameter at breast height and/or is over 200 years old.
“Residual Tree” means a tree which was alive during the initial harvesting of the old growth forest, but either was a younger (smaller) tree at that time or was a suppressed tree in that forest.” Proposed new language:

Council Policy 11.3
Forest Management of Water Department Watershed Lands
Timber Harvests
Commercial Timber harvesting shall be allowed where it is consistent with the primary goals of maintaining forest health and drinking water source protection. Revenue generated from commercial harvest will be directed into dedicated accounts to be utilized for the purposes of furthering forest health, ecosystem resilience to fire and climate change, drinking water source protection, or other related Water Department ecosystem management goals. All commercial timber harvest plans shall be reviewed by the Water Commission and City Council prior to implementation.

Preservation of Old Growth Trees
The City Council of the City of Santa Cruz hereby declares it to be its policy that old growth and residual trees on City-owned lands are to be preserved unless safety factors or critical infrastructure needs dictate their removal, or if the Council makes a specific exception.

For the purposes of this policy, the following definitions will apply:
“Old Growth Tree” means a tree that is greater than 300 years old and has one or more of the following characteristics:
• Outline of the live crown is irregular
• Broken-off or spike top is present
• Epicormic branching or reiterations are present
• Large horizontal branches (>8") are present in the upper half of the tree • Cavities (goosepens), broken limbs or other "defect" present • Burn scars are visible on the trunk

16.3 “Residual” tree means a tree that was alive during the initial harvesting of the old growth forest but was small and not harvested during those harvests.” While these policy changes are unique to Water Department’s forest management on watershed lands, they are related to the citywide wildfire resiliency planning (WRP) effort recently reviewed by City Council. Whereas WRP focuses on maintaining defensible space and access, as well as infrastructure hardening, the proposed policy changes will enable healthier, more fireresilient forest conditions around infrastructure, reducing the risk of catastrophic wildfire events.

Additionally, the proposed policy changes will help clarify old growth tree standards so that large but non-old growth trees adjacent to critical water infrastructure can be managed more efficiently and cost-effectively.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: The proposed policy changes are exempt from CEQA review. Other than routine maintenance, all future forest management projects affected by these policy changes will go through CEQA review. While most projects will qualify for exemptions, timber harvests will require Timber Harvest Plans under the California Forest Practice Rules. This process is considered the functional equivalent of CEQA.

HEALTH IN ALL POLICIES (HiAP): These policy changes align well with the City’s HiAP pillars of public health and sustainability by supporting environmental and public health, increasing resilience to climate change, improving water supply reliability, potentially reducing water treatment costs, and providing other benefits to both City operations and stakeholders in our drinking water source watersheds. Furthermore, these changes support the HiAP equity pillar by enabling revenue from forest products to fund other forest health, restoration, and drinking water source protection goals that might otherwise require financial support from water rates paid for by ratepayers. Additionally, future forest health-related work is expected to involve significant stakeholder engagement. Finally, these policy changes institutionalize a more nuanced understanding of forest health needs, ultimately supporting the Water Department’s long-term management of watershed lands and drinking water source protection and overall protection of environmental and public health.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: The Watershed Section budget has sufficient funds in the Fiscal Year 2025 budget to initiate implementation of these policy changes.

Prepared By:

Chris Berry
Watershed Compliance
Manager
Submitted By:

Heidi Luckenbach
Water Director
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. RESOLUTION.DOCX

2. DRAFT COUNCIL POLICY 11.3 FOREST MANAGEMENT OF WATER DEPARTMENT WATERSHED LANDS.DOC

16.4 RESOLUTION NO. NS-XX,XXX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CRUZ REPEALING AND REPLACING COUNCIL POLICY 11.3
WHEREAS, THE City endeavors to supply water to customers in the most efficient, cost effective, and environmentally sustainable manner possible; and WHEREAS, the Water Department maintains nearly 4,000 acres of open space acreage for the purposes of drinking water source protection; and
WHEREAS, this open space requires management in order to ensure forest health; and WHEREAS, forest health contributes significantly to drinking water source protection goals; and
WHEREAS, the City staff modified the language of Council Policy 11.3 including renaming to reflect its true focus, Forest Management of Water Department Watershed Lands to clarify standards for performing forest health - related management work; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Santa Cruz that Council Policy 11.3 - Timber Harvests in Watershed Area and Preservation of Old Growth Trees is hereby repealed and replaced with Council Policy 11.3 - Forest Management of Water Department Watershed Lands, which shall take effect immediately.

PASSED AND ADOPTED this 11h day of March, 2025 by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

APPROVED: ______________________________
Fred Keeley, Mayor
ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator

16.5 COUNCIL POLICY 11.3

POLICY TITLE FOREST MANAGEMENT OF WATER

DEPARTMENT WATERSHED LANDS
POLICY STATEMENT:

Timber Harvests
Commercial Timber harvesting shall be allowed where it is consistent with the primary goals of maintaining forest health and drinking water source protection. Revenue generated from commercial harvest will be directed into dedicated accounts to be utilized for the purposes of furthering forest health, ecosystem resilience to fire and climate change, drinking water source protection, or other related Water Department ecosystem management goals. All commercial timber harvest plans shall be reviewed by the Water Commission and City Council prior to implementation.

Preservation of Old Growth Trees
The City Council of the City of Santa Cruz hereby declares it to be its policy that old growth and residual trees on City-owned lands are to be preserved unless safety factors or critical infrastructure needs dictate their removal, or if the Council makes a specific exception.

For the purposes of this policy, the following definitions will apply:
“Old Growth Tree” means a tree that is greater than 300 years old and has one or more of the following characteristics:
 Outline of the live crown is irregular
 Broken-off or spike top is present
 Epicormic branching or reiterations are present
 Large horizontal branches (>8") are present in the upper half of the tree  Cavities (goosepens), broken limbs or other "defect" present  Burn scars are visible on the trunk
“Residual” tree means a tree that was alive during the initial harvesting of the old growth forest but was small and not harvested during those harvests.

16.6 ORDINANCE NO. 2025-03

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA CRUZ AMENDING SANTA CRUZ MUNICIPAL CODE CHAPTER 9.36 (“NOISE”) AND CHAPTER 9.40 (“SOUND AMPLIFYING EQUIPMENT”) AND ADDING OBJECTIVE STANDARDS TO

BOTH CHAPTERS
WHEREAS, the City Council for the City of Santa Cruz finds that unreasonably loud noise in commercial areas is a major issue in the City impacting the public’s health, use, and enjoyment of both public and private spaces; and
WHEREAS, the City Council desires to set more objective standards related to unreasonable loud noise, similar to the objective standard contained in California Vehicle Code § 27007, which provides, in relevant part that, “[n]o driver of a vehicle shall operate . . . any sound amplification system which can be heard outside the vehicle from 50 or more feet when the vehicle is being operated”; and
WHEREAS, the City Council desires to set objective standards to create a community understanding about unreasonably loud noise and to foster an environment of mutual respect, while at the same time promoting self-expression; and
WHEREAS, these amendments to Chapters 9.36 and 9.40 establish objective standards as to when certain noises should be presumed to be unreasonably loud, in violation of Santa Cruz Municipal Code sections 9.36.020 and 9.40.010.

BE IT ORDAINED by the City Council of the City of Santa Cruz as follows:

SECTION 1. City Council Intent.

The City Council for the City of Santa Cruz finds that unreasonably loud noise in commercial areas is a major issue in the City impacting the public’s health, use, and enjoyment of both public and private spaces.

The City Council desires to set more objective standards related to unreasonable loud noise, similar to the objective standard contained in California Vehicle Code § 27007, which provides, in relevant part that, “[n]o driver of a vehicle shall operate . . . any sound amplification system which can be heard outside the vehicle from 50 or more feet when the vehicle is being operated”.

The City Council desires to set objective standards to create a community understanding about unreasonably loud noise and to foster an environment of mutual respect, while at the same time promoting self-expression.

17.1 ORDINANCE NO. 2025-03
2 These amendments to Chapters 9.36 and 9.40 establish objective standards as to when certain noises should be presumed to be unreasonably loud, in violation of Santa Cruz Municipal Code sections 9.36.020 and 9.40.010.

With these amendments, the Council intends for enforcement officers who observe violations of Section 9.36.020 and 9.40.010 to be able to cite for those violations without necessarily requiring a victim’s signature, similar to when enforcement officers witness other violations of law, such as running a stop sign or smoking on Pacific Avenue.

SECTION 2. Santa Cruz Municipal Code section 9.36.020, within Chapter 9.36 “Noise”, is hereby amended to read as follows:
“9.36.020 UNREASONABLY DISTURBING NOISES.

A. No person shall make, suffer or permit to be made any noises or sounds which are unreasonably loud, raucous, jarring or disturbing to people of ordinary sensitiveness.

B. The factors to be considered in determining whether to issue a citation for a violation and whether a violation of this section has occurred shall include, but not be limited to, the following:

1. The volume and intensity of the noise, music, or related sound;

2. The duration, continuousness or repetitive nature of the noise, music, or related sound;

3. Whether the origin of the noise, music, or related sound is natural or unnatural to the area in which it occurs;

4. The volume and intensity of the ambient or background noise or sound, if any;

5. The proximity of the noise, music, or related sound to residential sleeping facilities or to overnight accommodations, such as hotels and motels;

6. The proximity to offices, places of business or other areas where work is known to be carried on, of the noise, music, or related sound;

7. The nature and zoning of the area within which the noise, music, or related sound emanates;

8. The time of day or night the noise, music, or related sound occurs and the relationship of this time to the normal activities of the area in which it occurs and in relation to the other factors listed in this subsection; and

17.2 ORDINANCE NO. 2025-03
3 9. Whether the noise, music, or related sound is produced by a commercial or a noncommercial activity.

C. If the noise producing source is on public property in a commercial zone (as defined below), amplified noise and/or repetitive banging or percussive noises that can be heard 125 or more feet from the noise-producing source are presumptively unreasonably loud or disturbing as prohibited by this section. This presumption, however, shall not apply to permitted amplification or percussion used in special events or performances permitted by the City under a different part of the Municipal Code (e.g., Public Gathering and Expression Events (Chapter

10.65) and Major Public Special Events (Chapter 10.64)).

1. Within this section and SCMC § 9.40.010(B)(3), the term “commercial zone” means one of the following places: (i) the area within the boundaries of the Downtown Plan Area, as currently adopted or as amended; or (ii) the area along or within 75 feet of any point of Soquel Ave. within the City of Santa Cruz; or (iii) the area along or within 75 feet of any point on Mission St./Highway 1 within the City of Santa Cruz.” SECTION 3. Santa Cruz Municipal Code section 9.40.010, within Chapter 9.40 “Sound Amplifying Equipment”, is hereby amended to read as follows:
“9.40.010 RESTRICTIONS ON USE OF SOUND AMPLIFYING EQUIPMENT AND SOUND TRUCKS.

A. No person shall use or cause to be used any sound amplifying device or equipment at any place in the city, whether on public property or private property, except in accordance with subsection B.

B. Sound amplifying equipment and sound trucks:

1. Shall only be used to produce music or human speech, or both;

2. Shall not be emitted near hospitals, churches, schools, courthouses or city facilities in a manner that unreasonably disrupts, obstructs, impairs or interferes with the normal use and operation of such facilities for their intended purposes;

3. Shall be operated at a volume of sound that is not be unreasonably loud, raucous, jarring, disturbing or a nuisance to reasonable persons of normal sensitiveness within the range of audibility, considering the factors set forth in Section 9.36.020(B). If the noise producing source is on public property in a commercial zone (as defined by SCMC § 9.36.020(C)(1)), amplified noise that can be heard 125 or more feet from the noise-producing source is presumptively unreasonably loud or disturbing as prohibited by this subsection. This presumption, however, shall not apply to permitted amplification used in special events or performances permitted by the City under a

17.3 ORDINANCE NO. 2025-03
4 different part of the Municipal Code (e.g., Public Gathering and Expression Events (Chapter 10.65), Major Public Special Events (Chapter 10.64));

4. Shall be operated in a manner that directs sound, to the extent feasible, toward open unoccupied space and away from residential and business uses; and

5. Shall not be used between the hours of 10:00 p.m. and 8:00 a.m.” SECTION 4. Environmental Review. The Council finds that approval of this ordinance is not a “project” under the California Environmental Quality Act (CEQA). An activity undertaken, supported, or authorized by a public agency is a “project” subject to CEQA only if it “may cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment.” (Pub. Resources Code, § 21065.) Approval of this ordinance is not a “project” under CEQA because it does not have the potential to cause physical change in the environment directly or indirectly.

In the alternative, if this ordinance is considered a “project” under CEQA, the “common sense” exemption applies because it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment.” (14 Cal Code Regs 15061(b)(3).) Furthermore, the following exemptions are applicable:
• Class 7 Categorical Exemption because the Council action is intended “to assure the maintenance, restoration, or enhancement of a natural resource.” (Cal. Code Regs., tit. 14, § 15307.)
• Class 8 Categorical Exemption because the Council action is intended “to assure the maintenance, restoration, enhancement, or protection of the environment.” (Cal. Code Regs., tit. 14, § 15308.)
The project does not include construction activities or relaxation of standards allowing environmental degradation as prohibited by these exceptions.

SECTION 5. This ordinance shall take effect and be in force thirty (30) days after final adoption.

PASSED FOR PUBLICATION this 25th day of February 2025, by the following vote:

AYES: Councilmembers Brunner, Newsome, Golder; Mayor Keeley.

NOES: Councilmember Trigueiro, O’Hara; Vice Mayor Kalantari-Johnson.

ABSENT: None.

DISQUALIFIED: None.

17.4 ORDINANCE NO. 2025-03
5 APPROVED: ______________________________
Fred Keeley, Mayor
ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator
PASSED FOR FINAL ADOPTION this 11th day of March 2025, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

APPROVED: ______________________________
Fred Keeley, Mayor
ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator
This is to certify that the above and
foregoing document is the original
of Ordinance No. 2025-03 and that
it has been published or posted in
accordance with the Charter of the
City of Santa Cruz.
________________________________
Bonnie Bush, City Clerk Administrator

17.5 Proof of Publication
(2015 C.C.P.)
I, the undersigned, declare:

That I caused the attached legal notice/advertisement to be published in the Santa Cruz Good Times, a weekly newspaper published and circulated in the County of Santa Cruz, and adjudged a newspaper of general circulation by the Superior Court of California in and for the County of Santa Cruz, under Proceeding No. 68833; and that the legal notice/advertisement was published in the above-named newspaper on the following date(s), to wit:

March 5, 2025
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.

This 5th day of March, 2025, Santa Cruz, California
____________________________
Julia Wood
Deputy City Clerk Administrator

17.6 DECLARATION OF POSTING

STATE OF CALIFORNIA )
) SS.

COUNTY OF SANTA CRUZ )
On the 5th day of March, 2025, I posted conspicuously in three public places within the City of Santa Cruz, Ordinance No. 2025-03, to wit:

1. City Hall: 809 Center Street: Bulletin Board outside Room 9/10

2. City Hall: Bulletin Board outside Council Chambers

3. The City of Santa Cruz website
The document, posted in its entirety, consists of pages 1—5.

I declare under penalty of perjury that the foregoing is true and correct. Executed this 5th day of March, 2025, in Santa Cruz, California.
_______________________________
Julia Wood
Deputy City Clerk Administrator

17.7 Brittany Inclan
From: Dusten Dennis <[email protected]>
Sent: Sunday, March 2, 2025 10:11 AM
To: City Council
Subject: Please Cancel New Downtown Noise Restrictions
Dear City Council,
I was dismayed to read that the Council has advanced a new proposal to limit sound downtown to 125ft without a permit. Wonderful bands and street music is the ONE thing left in downtown that is holding the place together. If we impose more restrictions we will lose a tiny thread that is tenuously keeping Pacific Ave a place to frequent.

PLEASE VOTE NO on the 125ft ORDINANCE
Thanks,
Dusten Dennis
920 Cayuga St.

17.8 Brittany Inclan
From: Judi Grunstra <[email protected]>
Sent: Sunday, March 9, 2025 6:06 PM
To: City Council
Subject: Consent Public Hearing #17
Dear Mayor and Council:

I have to disagree with this:
"The City Council for the City of Santa Cruz finds that unreasonably loud noise in commercial areas is a major issue in the City impacting the public’s health, use, and enjoyment of both public and private spaces." Really? The 7 members of the Council have concluded on their own that loud noise is a major issue? There are many more issues that impact the public's health, use, and enjoyment of public and private space, including traffic congestion, scarcity of free public restrooms, petty theft, shuttered storefronts, etc.

Do we really want to burden our police personnel with enforcing this ordinance when they undoubtedly have more important issues to contend with?
The factors to be considered in determining whether to issue a citation for a violation and whether a violation of this section has occurred shall include, but not be limited to, the following: (this is no longer "objective - it's subjective)

1. The volume and intensity of the noise, music, or related sound;

2. The duration, continuousness or repetitive nature of the noise, music, or related sound;

3. Whether the origin of the noise, music, or related sound is natural or unnatural to the area in which it occurs;
(a pile driver might be "natural" to downtown).

4. The volume and intensity of the ambient or background noise or sound, if any;

5. The proximity of the noise, music, or related sound to residential sleeping facilities or to overnight accommodations, such as hotels and motels;

6. The proximity to offices, places of business or other areas where work is known to be carried on, of the noise, music, or related sound;

7. The nature and zoning of the area within which the noise, music, or related sound emanates;

8. The time of day or night the noise, music, or related sound occurs and the relationship of this time to the normal activities of the area in which it occurs and in relation to the other factors listed in this subsection; and

9. Whether the noise, music, or related sound is produced by a commercial or a noncommercial activity. (why does this matter? If the noise is disturbing, it's disturbing) The city already has a noise ordinance, prohibiting loud sounds between certain hours. We don't need additional language about time of day.

And what are "normal activities of the area in which it occurs"? Who defines that? Are UCSC student parties in residential neighborhoods a "normal activity in the area"? A band rehearsing? One could say that they are.

17.9 Is the loud and unsettling roar of motorcycle engines a "normal activity of the area"? Will police be called if a contingent of motorcyclists rides through downtown or the area defined by this ordinance? In a time when the President of the US is attempting to suppress rights and dissent, does the Santa Cruz City Council wish to follow a similar playbook? Leave the city's noise ordinance as is, please.

Judi Grunstra

17.10 ORDINANCE NO. 2024-04

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA CRUZ AMENDING SECTION 18.050.040 “ENERGY CODE – MODIFICATIONS” OF CHAPTER 18.15 “ENERGY CODE” OF THE CITY OF SANTA CRUZ MUNICIPAL CODE
BE IT ORDAINED By the City of Santa Cruz as follows:

Section 1. Table 150.0-J of Section 18.15.040 of Chapter 18.04 of the Santa Cruz Municipal Code is hereby amended to read as follows:
“Table 150.0-J: Measure Specifications
ID Measure Specification
General Measures
E1 Water Heating Package: Add exterior insulation meeting a minimum of R-6 to existing storage water heaters. Insulate all accessible hot water pipes with pipe insulation a minimum of ¾ inch thick. This includes insulating the supply pipe leaving the water heater, piping to faucets underneath sinks, and accessible pipes in attic spaces or crawlspaces. Upgrade fittings in sinks and showers to meet current California Green Building Standards Code (Title 24, Part 11) Section 4.303 water efficiency requirements.

Water heaters 20 gallons or less, or water heaters that are not able to add exterior insulation may not take credit for this measure.

Exception 1: Water heater blanket is not required on water heaters less than 20 gallons.

Exception 2: Water heater blanket not required if application of a water heater blanket voids the warranty on the water heater.

Exception 3: Upgraded fixtures are not required if existing fixtures have rated or measured flow rates of no more than ten percent greater than 2022 California Green Building Standards Code (Title 24, Part 11) Section 4.303 water efficiency requirements.

Exception 4: Water heaters with factory installed insulation of R-24 or greater E2 Induction Cooktop: Replace existing gas and electric resistance stove top with inductive stove top and cap the gas line..

E3 Heat Pump Clothes Dryer: Replace existing electric resistance clothes dryer with heat pump dryer with no resistance element and cap gas line.

E4 Air Sealing: Seal all accessible cracks, holes, and gaps in the building envelope at walls, floors, and ceilings. Pay special attention to penetrations including plumbing, electrical, and mechanical vents, recessed can light luminaires, and windows. Weather-strip doors if not already present.

Verification shall be conducted by a certified HERS Rater that either: a) shows at least a 30 percent reduction from pre-retrofit conditions; or b) shows that the number of air changes per hour at 50 Pascals pressure difference (ACH50) does not exceed ten for Pre-1978 vintage buildings, seven for 1978 to 1991 vintage buildings and five for 1992-2010 vintage buildings.

Compliance can also be demonstrated with blower door testing conducted by a certified HERS Rater no more than three years prior to the permit application date showing compliance with condition (a) or (b).

If combustion appliances are located within the pressure boundary of the building, conduct a combustion safety test by a professional certified by the Building Performance Institute in

18.1 ORDINANCE NO. 2025-04
2 accordance with the ANSI/BPI-1200-S-2017 Standard Practice for Basic Analysis of Buildings, the Whole House Combustion Appliance Safety Test Procedure for the Comfortable Home Rebates Program 2020 or the California Community Services and Development Combustion Appliance Safety Testing Protocol.

Reducing the air leakage of a building can reduce the building’s drying potential. When improving the air sealing of a building, consider if there is a need to add continuous ventilation to the building (if not already present).

E5 Duct Sealing: Air seal all space conditioning ductwork to meet the requirements of the 2022 Title 24 Section 150.2(b)1E. The duct system must be tested by a HERS Rater no more than three years prior to the alteration or addition permit application date to verify the duct sealing and confirm that the requirements have been met. This measure may not be combined with the New Ducts and Duct Sealing measure in this Table. Dwelling units without ductwork or where the ducts are in conditioned space may not take credit for this measure.

E6 R-49 Attic Insulation: Attic insulation shall be installed to achieve a weighted assembly Ufactor of 0.020 or insulation installed at the ceiling level shall have a thermal resistance of R-49 or greater for the insulation alone. Recessed downlight luminaires in the ceiling shall be covered with insulation to the same depth as the rest of the ceiling. Luminaires not rated for insulation contact must be replaced or fitted with a fire-proof cover that allows for insulation to be installed directly over the cover.

Exception: In buildings where existing R-30 is present and existing recessed downlight luminaires are not rated for insulation contact, insulation is not required to be installed over the luminaires.

E7 Windows: Replace at least 50% of existing windows with high performance windows with an area-weighted average U-factor no greater than 0.30.

E8 R-13 Wall Insulation: Install wall insulation in all exterior walls to achieve a weighted U-factor of 0.102 or install wall insulation in all exterior wall cavities that shall result in an installed thermal resistance of R-13 or greater for the insulation alone.

E9 New Ducts + Duct Sealing: Replace existing space conditioning ductwork with new R-8 ducts that meet the requirements of 2022 Title 24 Section 150.0(m)11. This measure may not be combined with the Duct Sealing measure in this Table. To qualify, a preexisting measure must have been installed no more than three years before the alteration or addition permit application date.

E10 R-19 Floor Insulation: Raised-floors shall be insulated such that the floor assembly has an assembly U-factor equal to or less than U-0.037, or shall be insulated between wood framing with insulation having an R-value equal to or greater than R-19. This measure cannot be combined with measure R-30 Floor insulation.

E11 R-30 Floor Insulation: Raised-floors shall be insulated such that the floor assembly has an assembly U-factor equal to or less than U-0.028, or shall be insulated between wood framing with insulation having an R-value equal to or greater than R-30. This measure cannot be combined with measure R-19 Floor insulation.

E12 Heat Pump Water Heater (HPWH): Replace existing electric resistance or natural gas storage water heater with a heat pump water heater.

E13 PV and Electric Ready Pre-Wire: Install a solar PV system that meets the requirements of 2022 Title 24 Section 150.1(c)14.

In addition to the solar PV system, comply with the water heating system electric readiness requirements per Section 150.0(w)4and the heat pump space heaters requirements per Section 150.0(t) and one of the following:

A. Energy Storage Systems (ESS) Ready, as specified in Section 150.0(s), or

18.2 ORDINANCE NO. 2025-04
3 B. EV Charger Ready as specified in the California Green Building Code, Title 24, Part 11, Section A4.106.8.1, which otherwise applies to new construction.

Exception 1: In buildings where the designated space requirement specified in Section 150.0(n)1 can be demonstrated to the building official as infeasible, the electric readiness components per Section 150.0(n)1 are not required.

E14 Heat Pump Space Heater: Replace all existing gas and electric resistance space heating systems with an electric-only heat pump system
Mandatory Measures
M1 Utility Room, Kitchen & Laundry-Related Electric Ready Pre-Wire: Where the project includes a kitchen remodel, comply with the electric cooktop ready requirement, as specified in Section 150.0(u). Where the project includes a laundry room remodel, comply with the electric clothes dryer ready requirement, as specified in Section 150.0(v). Where the project includes a utility room remodel, comply with the water heating system electric readiness requirements per Section 150.0(w)4and the heat pump space heater electric readiness requirements per Section 150.0(t):

Exception 1: If an electrical permit is not otherwise required for the project other than compliance with this measure.

Exception 2: If a utility service upgrade is not otherwise required for the project other than compliance with this measure.

Exception 3: In buildings where the designated space requirement specified in Section 150.0(w)4can be demonstrated to the building official as infeasible, the electric readiness components per Section 150.0(w)4are not required.

M2 Panel-Related Electric Ready Pre-Wire: Where the project includes a new electrical panel and electrical service upgrade to 200A or more, comply with the water heating systems electric readiness requirements per Section 150.0(w)4 and the heat pump space heater electric readiness requirements per Section 150.0(t).

Exception 1: In buildings where the designated space requirement specified in Section (150.0(w)4can be demonstrated to the building official as infeasible, the electric readiness components per Section 150.0(w)4 are not required.

Section 3. This ordinance shall take effect and be in full force thirty (30) days after final adoption.

18.3 ORDINANCE NO. 2025-04
4 PASSED FOR PUBLICATION this 25th day of February 2025, by the following vote:

AYES: Councilmembers Trigueiro, Brunner, Newsome, Golder, O’Hara; Vice Mayor Kalantari-Johnson; Mayor Keeley.

NOES: None.

ABSENT: None.

DISQUALIFIED: None.

APPROVED: ______________________________
Fred Keeley, Mayor
ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator
PASSED FOR FINAL ADOPTION this 11th day March 2025, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

APPROVED: ______________________________
Fred Keeley, Mayor
ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator
This is to certify that the above and
foregoing document is the original
of Ordinance No. 2025-04 and that
it has been published or posted in
accordance with the Charter of the
City of Santa Cruz.
________________________________
Bonnie Bush, City Clerk Administrator

18.4 Proof of Publication
(2015 C.C.P.)
I, the undersigned, declare:

That I caused the attached legal notice/advertisement to be published in the Santa Cruz Good Times, a weekly newspaper published and circulated in the County of Santa Cruz, and adjudged a newspaper of general circulation by the Superior Court of California in and for the County of Santa Cruz, under Proceeding No. 68833; and that the legal notice/advertisement was published in the above-named newspaper on the following date(s), to wit:

March 5, 2025
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.

This 5th day of March, 2025, Santa Cruz, California
____________________________
Julia Wood
Deputy City Clerk Administrator

18.5 DECLARATION OF POSTING

STATE OF CALIFORNIA )
) SS.

COUNTY OF SANTA CRUZ )
On the 5th day of March, 2025, I posted conspicuously in three public places within the City of Santa Cruz, Ordinance No. 2025-03, to wit:

1. City Hall: 809 Center Street: Bulletin Board outside Room 9/10

2. City Hall: Bulletin Board outside Council Chambers

3. The City of Santa Cruz website
The document, posted in its entirety, consists of pages 1—4.

I declare under penalty of perjury that the foregoing is true and correct. Executed this 5th day of March, 2025, in Santa Cruz, California.
_______________________________
Julia Wood
Deputy City Clerk Administrator

18.6 ORDINANCE NO. 2025-05

AN ORDINANCE OF THE CITY OF SANTA CRUZ AMENDING SANTA CRUZ MUNICIPAL CODE SECTION 18.48.050, CHILDCARE IMPACT FEES WHEREAS, on April 27, 2021, the City passed Ordinance No. 2021-10, which created the Santa Cruz Municipal Code Chapter 18.48, “Childcare Impact Fees;” and WHEREAS, the City Council provided direction to evaluate and update the Childcare Impact Fee charged to new residential and non-residential development; and WHEREAS, the intent of this ordinance is to remove those exemptions.

BE IT ORDAINED By the City of Santa Cruz as follows:

Section 1. Santa Cruz Municipal Code Section 18.48.050 “Exemptions” is hereby amended as follows:

18.48.050 Exemptions.

A. The following exemptions from the requirements for fees and exactions are imposed:
(a) Any type of project determined by the city council to have a reduced or insignificant childcare impact as per Section 18.48.070.
(b) Childcare or School Facility. Childcare facilities and any school or day care facility for children including preschools and kindergarten through grade twelve. (c) Senior Housing Project. Senior housing projects, except for congregate care or nursing home care projects for which the fee or exaction shall be based upon the number of employment opportunities resulting from such a type of project. (d) Housing units constructed and operated by a Santa Cruz County school district to provide living accommodations for its employees.
(e) Affordable Housing Projects. For purposes of this exemption, as further detailed below, Affordable Housing Projects are projects where one hundred percent of the units, excluding managers units, within the development are dedicated to lower income households. The affordable units within the development are subject to a recorded affordability restriction for a minimum of fifty-five years or per local inclusionary requirements, whichever is greater. The exemptions are as follows:

1. Affordable Housing Projects that incorporate childcare facilities into the proposed project are fully exempt from the childcare impact fee. However, if a childcare facility remains unoccupied by a childcare facility for three years

19.1 ORDINANCE NO. 2025-05
2 following final inspection or final certificate of occupancy, then the remaining 50% of the fee is due.

2. Affordable Housing Projects without childcare facilities are eligible for a fifty percent (50%) reduction in fees.
(f) Accessory dwelling units and junior accessory dwelling units of less than 750 square feet.
(g) Repairs or Replacement. The repair, remodel, modification, reconstruction or replacement of a residential or nonresidential building substantially equivalent to the preexisting building. Existing square footage beyond the preexisting amount is not exempt. This includes residential and nonresidential square footage being replaced due to natural disaster.
(h) Nonresidential Change of Use. Any change of use of an existing legally established nonresidential use, unless the change in use is determined by the city council to be so significant as to require a childcare impact fee.
(i) Public Project. Projects undertaken by a public agency except projects undertaken by a private developer on public property, and except property not used exclusively for a governmental purpose.
(j) Project with Complete Application on Effective Date of Ordinance. Project for which an application for permit was complete prior to the effective date of the ordinance codified in this section, except for any project which is required to comply with these measures pursuant to the provisions of a development agreement.

B. Change of use is entitled to an offset or a credit:
(a) If a project is changing its use, a credit in the amount offsetting the impact of its prior use shall be applied. For example, a development project converting existing hotel square footage into residential multi-family will have the fee for the proposed (including any addition) multifamily calculated and the fee for the existing hotel space calculated, and the existing hotel space will be credited against the new multifamily fee use. In the event that the credit exceeds the new fee, the fee shall be zero and no refunds are applicable.

C. No credits or exemptions will be given to properties that have been vacant for more than three years by the time of applying for building permit.
(Ord. 2021-10 § 1, 2021; Ord. 2019-26 § 1 (part), 2020).

Section 2. If any section or portion of this ordinance is found to be invalid by a court of competent jurisdiction, such finding shall not affect the validity of the remainder of the ordinance, which shall continue in full force and effect.

19.2 ORDINANCE NO. 2025-05
3 Section 3. This ordinance shall take effect and be in full force thirty (30) days after final adoption.

PASSED FOR PUBLICATION this 25th day of February 2025, by the following vote:

AYES: Councilmembers Trigueiro, Brunner, Newsome, Golder, O’Hara; Vice Mayor Kalantari-Johnson; Mayor Keeley.

NOES: None.

ABSENT: None.

DISQUALIFIED: None.

APPROVED: ______________________________
Fred Keeley, Mayor
ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator
PASSED FOR FINAL ADOPTION this 11th day March 2025, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

APPROVED: ______________________________
Fred Keeley, Mayor
ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator
This is to certify that the above and
foregoing document is the original
of Ordinance No. 2025-05 and that
it has been published or posted in
accordance with the Charter of the
City of Santa Cruz.
________________________________
Bonnie Bush, City Clerk Administrator

19.3 Proof of Publication
(2015 C.C.P.)
I, the undersigned, declare:

That I caused the attached legal notice/advertisement to be published in the Santa Cruz Good Times, a weekly newspaper published and circulated in the County of Santa Cruz, and adjudged a newspaper of general circulation by the Superior Court of California in and for the County of Santa Cruz, under Proceeding No. 68833; and that the legal notice/advertisement was published in the above-named newspaper on the following date(s), to wit:

March 5, 2025
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.

This 5th day of March, 2025, Santa Cruz, California
____________________________
Julia Wood
Deputy City Clerk Administrator

19.4 DECLARATION OF POSTING

STATE OF CALIFORNIA )
) SS.

COUNTY OF SANTA CRUZ )
On the 5th day of March, 2025, I posted conspicuously in three public places within the City of Santa Cruz, Ordinance No. 2025-03, to wit:

1. City Hall: 809 Center Street: Bulletin Board outside Room 9/10

2. City Hall: Bulletin Board outside Council Chambers

3. The City of Santa Cruz website
The document, posted in its entirety, consists of pages 1—3.

I declare under penalty of perjury that the foregoing is true and correct. Executed this 5th day of March, 2025, in Santa Cruz, California.
_______________________________
Julia Wood
Deputy City Clerk Administrator

19.5 City Council

AGENDA REPORT
DATE: 02/20/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Planning and Community Development
SUBJECT: Sidewalk Vending Ordinance Administrative Amendments. Applicant:

City of Santa Cruz. CEQA: Exempt per 15061(b)(3). (PL)
LOCATION: Citywide
RECOMMENDATION: Motion to introduce for publication an ordinance acknowledging the California Environmental Quality Act (CEQA) exemption and amending Santa Cruz Municipal Code (SCMC) Chapter 5.82 (“Sidewalk Vending”) to clarify the definition of an “Enforcement Official,” to specify the time period within which a vendor may receive citations before a permit may be revoked, to reduce the number of citations resulting in impoundment from four to three, to clarify and update restricted vending times and locations, and to provide clearer distinctions between roaming and stationary vending locations.

BACKGROUND: The City of Santa Cruz (City) piloted various sidewalk vending programs since Senate Bill (SB) 9461 “Safe Sidewalk Vending Act” became effective January 1, 2019. (Government Code sections 51036 et seq.) SB 946 limited the City’s ability to regulate sidewalk vending and prohibited criminal punishment for sidewalk vending-related violations. The pilot programs allowed staff to have a better understanding of the impact of SB 946 implementation, especially in the popular vending area of Beach Street.

The City Council adopted the Sidewalk Vending Ordinance SCMC Chapter 5.82 (“Sidewalk Vending”) on April 12, 2022 and approved the fees associated with the administration and enforcement on May 10, 2022. At the February 14, 20232 meeting, the City Council adopted amendments to SCMC Chapter 5.82 that updated sidewalk vending definitions and conduct and clarified the permit application process and number of citations issued prior to impound.

DISCUSSION: The City’s Sidewalk Vending Ordinance was administered starting May 2022 with the coordination of the following departments: City Manager’s Office, City Attorney’s Office, Planning and Community Development, Parks and Recreation, Economic Development, and Police. During the implementation of the Sidewalk Vending Program from May 2022 to present, staff continues to identify opportunities to provide further clarification to the Ordinance and improve its efficiency.
1 https://leginfo.legislature.ca.gov/faces/billTextClient.xhtml?bill_id=201720180SB946 2 https://ecm.cityofsantacruz.com/OnBaseAgendaOnline/Meetings/ViewMeeting?id=2053&doctype=1#

20.1 Proposed Amendments
Staff is recommending the following additional amendments to SCMC Chapter 5.82 for City Council consideration. The proposed updated Ordinance is attached with clean and track changes versions.
 Amendment to 5.82.020(p) – Definitions: Updating definitions of “enforcement official.” This change clarifies who can enforce the Ordinance, specifically expanding the definition to include any individuals designated to issue citations under SCMC

4.02.021.
 Amendment to 5.82.050(f) – Sidewalk Vending Permit Approval, Conditions, Denial, or Revocation: Adding a twenty-four-month timeline for citations issued prior to permit revocation. This change clarifies the time period within which a sidewalk vendor can receive four or more subsequent citations before being considered for permit revocation. Currently the ordinance does not include a timeframe, allowing for different interpretations of the revocation provision.
 Amendment to 5.82.080(a)(2) – Restricted Vending Times and Locations: Adding additional location where stationary sidewalk vendors cannot vend without permits and approval. This change enables the enforcement of the ordinance against stationary vendors who do not reserve one of the five City-demarcated vending and display zones on Beach Street between the Municipal Wharf and Third Street, during the off season (November 1 through March 31). This amendment addresses safety concerns by preventing stationary vendors from operating outside these designated areas, which causes pedestrian congestion and forces people into traffic or bike lanes.  Amendment to 5.82.080(a)(3) – Restricted Vending Times and Locations: Section

5.82.080(a)(3) would be relocated to 5.82.080(b)(6) to clarify that both roaming and stationary sidewalk vendors cannot vend within five hundred feet of a permitted certified farmer’s market, a swap meet, or an area designated for a temporary special permit. The current Ordinance allows for roaming vendors to vend in these locations. The proposed amendments would extend the restriction to roaming vendors, consistent with SB 946, Government Code section 51038(d)(1)-(2).  Amendment to 5.82.090(a) – Vending in City Parks and Beaches: Adding “parks and recreation” on the name of the vending permit. This change clarifies the name of the permit, and which department issues it.
 Amendment to 5.82.120 – Impoundment: Updating the required number of citations to be issued prior to an impoundment from four to three. Staff have observed that citations and their associated fees do not always deter unpermitted vending and recommends reducing the required number of citations issued before impoundment to improve compliance.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: This has no impact on the natural environment, because it does not create any physical change to the environment. Therefore, it is not considered a project under CEQA. However, if it were considered a project, it would be exempt from review under the CEQA Guidelines Section 15061(b)(3) (known as the “Common Sense” exemption) in that it would not reasonably be seen

20.2 to create a significant impact on the environment. It would also be exempt under Section 15306 (Information Collection) of the CEQA Guidelines in that it relates to analysis and provision of information to the Council.

HEALTH IN ALL POLICIES (HiAP): The goal of Health in All Policies (HiAP) is to ensure that decision-makers are informed about the impacts on the three HiAP pillars of public health, equity, and sustainability when reviewing projects and policy options. While sidewalk vending provides important entrepreneurship and economic development opportunities to low-income and migrant communities, the State has acknowledged that it can result in public health and safety impacts, and, therefore, the State allows this activity to be regulated to a certain extent.

Currently, numerous unpermitted vendors are selling food under unsanitary conditions, and other vendors endanger public health and pedestrian safety by operating in unsafe locations such as unpermitted areas, parking meters, and streets. The proposed changes to the Ordinance support the public health and equity pillars of HiAP through balancing public health with economic opportunities for vendors.

FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: No

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: No fiscal impacts.

Prepared By:

Laura Landry
Code Compliance Manager

Kim Dorey
Code Compliance Supervisor
Ashley Wheelock
Deputy City Attorney
Submitted By:

Lee Butler
Planning & Community
Development Director
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. ORDINANCE – CLEAN.DOCX

2. ORDINANCE – WITH TRACK CHANGES.DOCX

20.3 ORDINANCE NO. 2025-XX

AN ORDINANCE OF THE CITY OF SANTA CRUZ AMENDING SANTA CRUZ MUNICIPAL CODE SECTION 5.82 RELATED TO SIDEWALK VENDING REGULATIONS

WHEREAS, in 2019, California Senate Bill ("SB") 946 (Sidewalk Vendors) became law, decriminalizing commercial sidewalk vending and limiting local governments' ability to restrict sidewalk vending;
WHEREAS, on April 12, 2022, the City passed Ordinance No. 2022-03, which created the Santa Cruz Municipal Code Chapter 5.82, “Sidewalk Vending;” to promote public health, safety, and welfare, through a comprehensive City-wide dedicated sidewalk vending permitting and regulation scheme that both complies with state law and is effective at regulating sidewalk vending in public spaces;
WHEREAS, on February 12, 2023, the City amended the Ordinance in Ordinance No. 2023-04;

WHEREAS, the intent of this ordinance is to update the current sidewalk vending permitting and regulation scheme to effectively regulate sidewalk vending in a way that: (a) complies with state law; (b) addresses objective public health, safety, and welfare concerns; (c) promotes the public's use and enjoyment of natural resources and recreational opportunities; and (d) prevents an undue concentration of commercial activity that unreasonably interferes with the scenic and natural character of City parks and open spaces.

WHEREAS, this has no impact on the natural environment, because it does not create any physical change to the environment. Therefore, it is not considered a project under CEQA. However, if it were considered a project, it would be exempt from review under the CEQA Guidelines Section 15061(b)(3) (known as the “Common Sense” exemption) in that it would not reasonably be seen to create a significant impact on the environment. It would also be exempt under Section 15306 (Information Collection) of the CEQA Guidelines in that it relates to analysis and provision of information to the Council.

NOW, THEREFORE, BE IT ORDAINED By the City of Santa Cruz as follows:

Section 1. Santa Cruz Municipal Code Section 5.82.020 “Definitions” is hereby amended as follows:

5.82.020 DEFINITIONS.

For the purpose of this chapter, the following words and phrases are defined as follows:
a) “City-demarcated vending and display zones” means those areas specifically set aside for sidewalk vending, operating vending display devices, operating other display devices, and/or conducting First Amendment activities. The city-demarcated vending and display

20.4 zones on Pacific Avenue are marked on the sidewalk, and an up-to-date, accurate copy of the map of Pacific Avenue city-demarcated vending and display zones shall be posted on the city’s website. The city-demarcated vending and display zones on Pacific Avenue must permit a reasonable amount of sidewalk vending on Pacific Avenue, but also must limit vending on Pacific Avenue solely based on objective health, safety, or welfare concerns. b) “Director” means the director of the planning and community development department or their designee.
c) “Farmers’ market” or “certified farmers’ market” means a location operated in accordance with Chapter 10.5 (commencing with Section 47000) of Division 17 of the Food and Agricultural Code and any regulations adopted pursuant to that chapter. d) “Food” means raw, cooked, or processed edible substance, ice, beverage, an ingredient used or intended for use or for sale in whole or in part for human consumption, chewing gum and/or any other items defined as food by the California Retail Food Code. e) “Food sidewalk vendor” means any type of sidewalk vendor offering products defined as food.
f) “Mobile vendor” means any person in charge of or driving any motorized mobile vending vehicle requiring a state driver’s license to operate, either as an agent, employee, or otherwise under the direction of the owner.
g) “No vending or limited vending zone” means an area where sidewalk vending is prohibited or limited due to objective public health, safety, or welfare concerns. The city council may establish no vending or limited vending zones by resolution, as set forth in Section

5.82.080(c).
h) “Roaming sidewalk vendor” means a sidewalk vendor who moves from place to place and stops only to complete a transaction.
i) “Sidewalk vending” means to sell, offer for sale, expose or display for sale, solicit offers to purchase, or to barter food, goods, or merchandise on any public sidewalk, pedestrian path, park, or other public property, with or without the assistance of a vending display device, or to require someone to pay a fee or to set, negotiate, or establish a fee before providing any such food, goods, or merchandise, even if characterized by the sidewalk vendor as a donation.
j) “Sidewalk vending permit” means a permit or card issued by the city to a sidewalk vendor pursuant to Section 5.82.040.
k) “Sidewalk vendor” means a person who sells food or merchandise from a vending display device or from one’s person, upon a public sidewalk, pedestrian path, park, or other public property. This term is inclusive of both roaming and stationary sidewalk vendors.

20.5 l) “Stationary sidewalk vendor” means a sidewalk vendor who vends from a fixed location. m) “Swap meet” means a location operated in accordance with Article 6 (commencing with Section 21660) of Chapter 9 of Division 8 of the Business and Professions Code and any regulations adopted pursuant to that article.
n) “Temporary special permit” is any permit issued by the city for the temporary use of, or encroachment on, the sidewalk or other public area, including, but not limited to, an encroachment permit pursuant to Chapter 15.34, a major public special event permit pursuant to Chapter 10.64, or any other type of city-issued temporary event permit, for purposes including, but not limited to, filming, parades, or outdoor concerts. o) “Vending display device” means a pushcart, stand, display, pedal-driven cart, wagon, showcase, rack, nonmotorized conveyance (including trailers), freestanding table, rack, chair, box, stand, or any container, structure, or other object used or capable of being used for holding, selling, advertising, or displaying tangible things, together with any associated seating facilities. “Vending display device” does not include any street furniture such as benches or planters, any other structure permanently installed by the city of Santa Cruz or with the consent of the city of Santa Cruz, or news racks placed in conformity with the provisions of this code regulating news racks.
p) “Enforcement official” means any person designated by the city manager to enforce this chapter and includes, but is not limited to: planning and community development department or parks and recreation department staff tasked with code enforcement or compliance, all Santa Cruz police department sworn personnel and community service officers, any person designated to issue citations under 4.02.021, and/or any city-contracted code enforcement officer or specialist.

Section 2. Santa Cruz Municipal Code Section 5.82.050 “Sidewalk Vending Permit Approval, Conditions, Denial, or Revocation” is hereby amended as follows:

5.82.050 SIDEWALK VENDING PERMIT APPROVAL, CONDITIONS, DENIAL, OR REVOCATION.
a) The director or their designee shall approve the issuance of the sidewalk vending permit unless they determine that:
1) Information contained in the application, or supplemental information requested from the applicant, is false in any material detail; or
2) The proposed operations contained in the application are contrary to the provisions of this chapter, or are contrary to any regulations promulgated pursuant to Section

5.82.030(b); or

20.6 3) The applicant has failed to provide a complete application, after having been notified of the requirement to produce additional information or documents; or 4) The applicant has failed to demonstrate an ability to conform to the operating standards set forth in this chapter or any standards set forth in regulations promulgated pursuant to Section 5.82.030(b); or
5) The applicant has failed to pay or otherwise resolve any previous administrative citations associated with a previous violation of this chapter; or 6) The location of the proposed vending operations has already been approved for another use (including potentially other vending operations) at the time the applicant proposes to vend at the subject location; or
7) The proposed vending operations are illegal, and/or the city’s approval of a sidewalk vending permit would be contrary to legal requirements applicable to the city. b) If the permit is denied, written notice of such denial and the reasons therefore shall be provided to the applicant.
c) The director or their designee may add reasonable sidewalk vending permit conditions, regulating the time, place, and manner of sidewalk vending. Such conditions must be (1) consistent with this chapter and any regulations promulgated pursuant to Section 5.82.030(b), and (2) directly related to objective public health, safety, or welfare concerns, or directly related to legal requirements applicable to the city. A violation of the sidewalk vending permit conditions is considered a violation of this chapter. d) Use of a shade structure may be requested in a sidewalk vending permit application and park’s vending permit application, and such request will be granted if: (1) there is adequate space for the shade structure at the proposed vending location (including any space needed for pedestrians (including disabled pedestrians), vehicles, and bicyclists); (2) use of the shade structure at the proposed location would not adversely impact or put at risk public health, safety, or welfare; and (3) use of the shade structure at the proposed location would not be contrary to legal requirements applicable to the city.
e) Use of a generator may be requested in a sidewalk vending permit application, and such request will be granted if the proposed generator use: (1) will not create unreasonable noise, trip and fall hazards, or other adverse risks or impacts to public health, safety, or welfare; (2) is not otherwise illegal or contrary to legal requirements applicable to the city; and (3) is approved by all appropriate regulating entities, such as the Monterey Bay Air Resources District (MBARD), if those appropriate regulating entities require generator use approval. f) The director or their designee may revoke a sidewalk vending permit for a fourth or subsequent violation of this chapter within a twenty-four-month period. A sidewalk vendor whose permit is revoked may apply for a new sidewalk vending permit upon the expiration of the term of the rescinded permit.

20.7 g) Any person whose application for a sidewalk vending permit is denied, revoked, or conditioned in a way that the applicant believes is not in accordance with applicable legal requirements may appeal such decision to the city manager by filing a written notice of appeal with the city manager or their designee within ten calendar days after receipt of the notice of denial, conditions, or revocation. The appeal hearing shall be conducted pursuant to the administrative enforcement hearing procedure contained in Title 4. If the appeal is successful, the hearing officer will order the city to return the fee paid for appeal.

Section 3. Santa Cruz Municipal Code Section 5.82.080 “Restricted Vending Times and Locations” is hereby amended as follows:

5.82.080 RESTRICTED VENDING TIMES AND LOCATIONS.
a) Unless specifically permitted by another provision of this municipal code, to ensure rapid access by first responder and emergency personnel; to improve sidewalk accessibility for persons with disabilities; to facilitate ingress into and egress from vehicles, rights-of-way, buildings, and public spaces; to maximize use and promote maintenance of public rights-ofway, parks, the beach, and other public spaces; to help preserve and protect sensitive habitats, community landmarks, natural and scenic areas and the Monterey Bay National Marine Sanctuary; and to reduce the city’s exposure to civil liability, stationary sidewalk vending is not permitted in the following limited areas:
1) Year round, in areas on Pacific Avenue that are outside of the city-demarcated vending and display zones;
2) From November 1st through March 31st, on the streets and sidewalks of Beach Street between the Municipal Wharf and Third Street that are outside of the city-demarcated vending and display zones;
3) Year round, in any city park or beach where the City has entered into an agreement for concessions that exclusively permits the sale of food or merchandise by the concessionaire;
4) Year round, in areas that are zoned exclusively residential, including within residentially zoned parks; and
5) Year round, within the city’s open space, natural, and scenic areas, which includes Arana Gulch, Pogonip, Moore Creek, the San Lorenzo Riverwalk, and the West Cliff Drive pedestrian/bike path.
b) For the same reasons identified in subsection (a), both stationary and roaming sidewalk vending shall not be permitted in the following limited areas:

20.8 1) From April 1st through October 31st, on the streets and sidewalks of Beach Street between the Municipal Wharf and Third Street;
2) Year round, on the vehicle and pedestrian thoroughfares of the Santa Cruz Municipal Wharf;
3) Year round, on that portion of Main Beach over which the city has an easement for recreation and beach purposes only pursuant to a 1933 superior court judgment quieting title to the Seaside Company, which mandates “that no peddling, soliciting or bartering shall be permitted thereon”;
4) Year round, on the Beach Street Promenade Deck;
5) Year round, on a bike path, a street (including within on-street parking spaces), within a driveway, or in a public parking lot; and
6) Within five hundred feet of a permitted certified farmer’s market, a swap meet, or an area designated for a temporary special permit. This prohibition shall be limited to the operating hours of the farmer’s market or swap meet, or the limited duration of the temporary special permit.
c) The city council, by resolution, may from time to time designate no vending or limited vending zones due to objective health, safety, or welfare concerns. In designating a no vending or limited vending zone, the city council shall first determine that vending without limitation in the area would impede or interfere with public health, safety, or welfare. d) This section shall not be construed as prohibiting events that are conducted pursuant to, and in accordance with, Chapters 10.64, Major Public Special Events, and 10.65, Public Gathering and Expression Events.

Section 4. Santa Cruz Municipal Code Section 5.82.090 “Vending in City Beaches and Parks” is hereby amended as follows:

5.82.090 VENDING IN CITY BEACHES AND PARKS.
a) An additional parks and recreation vending permit is required for sidewalk vendors who wish to operate in a city park, beach, or other facility within the jurisdiction of the parks and recreation department, including that portion of the Beach Street sidewalk operated by the parks and recreation department, between the Municipal Wharf and Third Street. No person may vend in a city park, city beach, or facility within the jurisdiction of the parks and recreation department without first obtaining a parks vending permit. b) The director of parks and recreation, or their designee, may refuse to grant a parks vending permit if:
1) The sidewalk vendor does not yet have a sidewalk vending permit; or

20.9 2) If granting the parks vending permit would negatively impact objective health, safety, or welfare concerns; or
3) If denial is necessary to ensure the public’s use and enjoyment of natural resources or recreational opportunities; or
4) If denial of the permit is necessary to prevent an undue concentration of commercial activity that unreasonably interferes with the scenic and natural character of the park or beach; or
5) If the location of the proposed vending operations has already been approved for another use (including potentially other vending operations) at the time the applicant proposes to vend at the subject location; or
6) If the vending operations are illegal, or the city’s approval of the permit would be contrary to legal requirements imposed on the city.
c) If the permit is denied, written notice of such denial and the reasons therefor shall be provided to the applicant.
d) The director of parks and recreation, or their designee, may attach conditions to a parks vending permit. All conditions must be: (1) directly related to objective health, safety, welfare concerns, or directly related to legal requirements imposed on the city; or (2) necessary to ensure the public’s use and enjoyment of natural resources and recreational opportunities; or (3) necessary to prevent an undue concentration of commercial activity that unreasonably interferes with the scenic and natural character of the park. e) Any person aggrieved by a decision of the parks and recreation department to issue, deny issuance, condition, or rescind a parks vending permit may appeal the decision to the city manager or their designee within ten calendar days after receipt of the notice of denial, conditions, or revocation. The appeal hearing shall be conducted pursuant to the administrative enforcement hearing procedure contained in Title 4. If the appeal is successful, the hearing officer shall order the city to return the fee paid for appeal.

Section 5. Santa Cruz Municipal Code Section 5.82.120 “Impoundment” is hereby amended as follows:

5.82.120 IMPOUNDMENT.
a) The city may impound vending display devices, food, goods, and/or merchandise that:
1) Reasonably appear to be abandoned on public property; or 2) Are displayed, offered, or made available for rent or sale by a sidewalk vendor who (A) operates in violation of this chapter; and (B) refuses or fails to provide

20.10 identification, as required by Section 5.82.110(f); and (C) refuses to remove their vending display device, food for sale, and/or goods/merchandise for sale after being instructed to do so by a city enforcement official; or
3) Are displayed, offered, or made available for rent or sale by a sidewalk vendor who (A) does not possess a valid applicable sidewalk vending permit (and/or, if applicable, a valid applicable parks vending permit); and (B) also refuses to remove their vending display device, food for sale, and/or goods/merchandise for sale after being instructed to do so by a city enforcement official; or 4) Is (A) creating an imminent and substantial safety or environmental hazard by the location of the vending display device or the nature of the goods being offered for sale, and (B) refuses to remove their vending display device, food for sale, and/or goods/merchandise for sale after being instructed to do so by a city enforcement official; or
5) Are displayed, offered, or made available for rent or sale by a sidewalk vendor who has, within a twenty-four-month period, been issued three or more administrative citations for violations of this chapter.
b) The city may immediately dispose of impounded materials that are perishable or cannot be safely stored.
c) An aggrieved vendor may, within ten days, appeal the impoundment of their property by requesting an administrative hearing before a hearing officer appointed by the city under Title 4, and if successful in their appeal, may have their property returned without paying an impound fee. The appeal hearing shall be conducted pursuant to the administrative enforcement hearing procedure contained in Title 4. Any appeal fee paid by the sidewalk vendor shall be returned to the sidewalk vendor if they are successful on appeal. d) An individual may recover impounded materials upon paying applicable impound fees and demonstrating proper proof of ownership.
e) The city council may by resolution adopt impound fees, which shall reflect the city’s enforcement, investigation, storage, and impound costs. f) Any unclaimed items will be considered abandoned and forfeited to the city after ninety days following impoundment.

Section 6. If any section or portion of this ordinance is found to be invalid by a court of competent jurisdiction, such finding shall not affect the validity of the remainder of the ordinance, which shall continue in full force and effect.

Section 7. This ordinance shall take effect and be in full force thirty (30) days after final adoption.

20.11 PASSED FOR PUBLICATION this 11th day of March, 2025, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

APPROVED: __________________________
Fred Keeley, Mayor

ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator

20.12 ORDINANCE NO. 2025-XX

AN ORDINANCE OF THE CITY OF SANTA CRUZ AMENDING SANTA CRUZ MUNICIPAL CODE SECTION 5.82 RELATED TO SIDEWALK VENDING REGULATIONS

WHEREAS, in 2019, California Senate Bill ("SB") 946 (Sidewalk Vendors) became law, decriminalizing commercial sidewalk vending and limiting local governments' ability to restrict sidewalk vending;
WHEREAS, on April 12, 2022, the City passed Ordinance No. 2022-03, which created the Santa Cruz Municipal Code Chapter 5.82, “Sidewalk Vending;” to promote public health, safety, and welfare, through a comprehensive City-wide dedicated sidewalk vending permitting and regulation scheme that both complies with state law and is effective at regulating sidewalk vending in public spaces;
WHEREAS, on February 12, 2023, the City amended the Ordinance in Ordinance No. 2023-04;

WHEREAS, the intent of this ordinance is to update the current sidewalk vending permitting and regulation scheme to effectively regulate sidewalk vending in a way that: (a) complies with state law; (b) addresses objective public health, safety, and welfare concerns; (c) promotes the public's use and enjoyment of natural resources and recreational opportunities; and (d) prevents an undue concentration of commercial activity that unreasonably interferes with the scenic and natural character of City parks and open spaces.

WHEREAS, this has no impact on the natural environment, because it does not create any physical change to the environment. Therefore, it is not considered a project under CEQA. However, if it were considered a project, it would be exempt from review under the CEQA Guidelines Section 15061(b)(3) (known as the “Common Sense” exemption) in that it would not reasonably be seen to create a significant impact on the environment. It would also be exempt under Section 15306 (Information Collection) of the CEQA Guidelines in that it relates to analysis and provision of information to the Council.

NOW, THEREFORE, BE IT ORDAINED By the City of Santa Cruz as follows:

Section 1. Santa Cruz Municipal Code Section 5.82.020 “Definitions” is hereby amended as follows:

5.82.020 DEFINITIONS.

For the purpose of this chapter, the following words and phrases are defined as follows:
a) “City-demarcated vending and display zones” means those areas specifically set aside for sidewalk vending, operating vending display devices, operating other display devices, and/or conducting First Amendment activities. The city-demarcated vending and display

20.13 zones on Pacific Avenue are marked on the sidewalk, and an up-to-date, accurate copy of the map of Pacific Avenue city-demarcated vending and display zones shall be posted on the city’s website. The city-demarcated vending and display zones on Pacific Avenue must permit a reasonable amount of sidewalk vending on Pacific Avenue, but also must limit vending on Pacific Avenue solely based on objective health, safety, or welfare concerns. b) “Director” means the director of the planning and community development department or their designee.
c) “Farmers’ market” or “certified farmers’ market” means a location operated in accordance with Chapter 10.5 (commencing with Section 47000) of Division 17 of the Food and Agricultural Code and any regulations adopted pursuant to that chapter. d) “Food” means raw, cooked, or processed edible substance, ice, beverage, an ingredient used or intended for use or for sale in whole or in part for human consumption, chewing gum and/or any other items defined as food by the California Retail Food Code. e) “Food sidewalk vendor” means any type of sidewalk vendor offering products defined as food.
f) “Mobile vendor” means any person in charge of or driving any motorized mobile vending vehicle requiring a state driver’s license to operate, either as an agent, employee, or otherwise under the direction of the owner.
g) “No vending or limited vending zone” means an area where sidewalk vending is prohibited or limited due to objective public health, safety, or welfare concerns. The city council may establish no vending or limited vending zones by resolution, as set forth in Section

5.82.080(c).
h) “Roaming sidewalk vendor” means a sidewalk vendor who moves from place to place and stops only to complete a transaction.
i) “Sidewalk vending” means to sell, offer for sale, expose or display for sale, solicit offers to purchase, or to barter food, goods, or merchandise on any public sidewalk, pedestrian path, park, or other public property, with or without the assistance of a vending display device, or to require someone to pay a fee or to set, negotiate, or establish a fee before providing any such food, goods, or merchandise, even if characterized by the sidewalk vendor as a donation.
j) “Sidewalk vending permit” means a permit or card issued by the city to a sidewalk vendor pursuant to Section 5.82.040.
k) “Sidewalk vendor” means a person who sells food or merchandise from a vending display device or from one’s person, upon a public sidewalk, pedestrian path, park, or other public property. This term is inclusive of both roaming and stationary sidewalk vendors.

20.14 l) “Stationary sidewalk vendor” means a sidewalk vendor who vends from a fixed location. m) “Swap meet” means a location operated in accordance with Article 6 (commencing with Section 21660) of Chapter 9 of Division 8 of the Business and Professions Code and any regulations adopted pursuant to that article.
n) “Temporary special permit” is any permit issued by the city for the temporary use of, or encroachment on, the sidewalk or other public area, including, but not limited to, an encroachment permit pursuant to Chapter 15.34, a major public special event permit pursuant to Chapter 10.64, or any other type of city-issued temporary event permit, for purposes including, but not limited to, filming, parades, or outdoor concerts. o) “Vending display device” means a pushcart, stand, display, pedal-driven cart, wagon, showcase, rack, nonmotorized conveyance (including trailers), freestanding table, rack, chair, box, stand, or any container, structure, or other object used or capable of being used for holding, selling, advertising, or displaying tangible things, together with any associated seating facilities. “Vending display device” does not include any street furniture such as benches or planters, any other structure permanently installed by the city of Santa Cruz or with the consent of the city of Santa Cruz, or news racks placed in conformity with the provisions of this code regulating news racks.
p) “Enforcement official” means any person designated by the city manager to enforce this chapter and includes, but is not limited to: planning and community development department or parks and recreation department staff tasked with code enforcement or compliance, all Santa Cruz police department sworn personnel and community service officers, any person designated to issue citations under 4.02.021, and/or any city-contracted code enforcement officer or specialist.

Section 2. Santa Cruz Municipal Code Section 5.82.050 “Sidewalk Vending Permit Approval, Conditions, Denial, or Revocation” is hereby amended as follows:

5.82.050 SIDEWALK VENDING PERMIT APPROVAL, CONDITIONS, DENIAL, OR REVOCATION.
a) The director or their designee shall approve the issuance of the sidewalk vending permit unless they determine that:
1) Information contained in the application, or supplemental information requested from the applicant, is false in any material detail; or
2) The proposed operations contained in the application are contrary to the provisions of this chapter, or are contrary to any regulations promulgated pursuant to Section

5.82.030(b); or

20.15 3) The applicant has failed to provide a complete application, after having been notified of the requirement to produce additional information or documents; or 4) The applicant has failed to demonstrate an ability to conform to the operating standards set forth in this chapter or any standards set forth in regulations promulgated pursuant to Section 5.82.030(b); or
5) The applicant has failed to pay or otherwise resolve any previous administrative citations associated with a previous violation of this chapter; or 6) The location of the proposed vending operations has already been approved for another use (including potentially other vending operations) at the time the applicant proposes to vend at the subject location; or
7) The proposed vending operations are illegal, and/or the city’s approval of a sidewalk vending permit would be contrary to legal requirements applicable to the city. b) If the permit is denied, written notice of such denial and the reasons therefore shall be provided to the applicant.
c) The director or their designee may add reasonable sidewalk vending permit conditions, regulating the time, place, and manner of sidewalk vending. Such conditions must be (1) consistent with this chapter and any regulations promulgated pursuant to Section 5.82.030(b), and (2) directly related to objective public health, safety, or welfare concerns, or directly related to legal requirements applicable to the city. A violation of the sidewalk vending permit conditions is considered a violation of this chapter. d) Use of a shade structure may be requested in a sidewalk vending permit application and park’s vending permit application, and such request will be granted if: (1) there is adequate space for the shade structure at the proposed vending location (including any space needed for pedestrians (including disabled pedestrians), vehicles, and bicyclists); (2) use of the shade structure at the proposed location would not adversely impact or put at risk public health, safety, or welfare; and (3) use of the shade structure at the proposed location would not be contrary to legal requirements applicable to the city.
e) Use of a generator may be requested in a sidewalk vending permit application, and such request will be granted if the proposed generator use: (1) will not create unreasonable noise, trip and fall hazards, or other adverse risks or impacts to public health, safety, or welfare; (2) is not otherwise illegal or contrary to legal requirements applicable to the city; and (3) is approved by all appropriate regulating entities, such as the Monterey Bay Air Resources District (MBARD), if those appropriate regulating entities require generator use approval. f) The director or their designee may revoke a sidewalk vending permit for a fourth or subsequent violation of this chapter within a twenty-four-month period. A sidewalk vendor whose permit is revoked may apply for a new sidewalk vending permit upon the expiration of the term of the rescinded permit.

20.16 g) Any person whose application for a sidewalk vending permit is denied, revoked, or conditioned in a way that the applicant believes is not in accordance with applicable legal requirements may appeal such decision to the city manager by filing a written notice of appeal with the city manager or their designee within ten calendar days after receipt of the notice of denial, conditions, or revocation. The appeal hearing shall be conducted pursuant to the administrative enforcement hearing procedure contained in Title 4. If the appeal is successful, the hearing officer will order the city to return the fee paid for appeal.

Section 3. Santa Cruz Municipal Code Section 5.82.080 “Restricted Vending Times and Locations” is hereby amended as follows:

5.82.080 RESTRICTED VENDING TIMES AND LOCATIONS.
a) Unless specifically permitted by another provision of this municipal code, to ensure rapid access by first responder and emergency personnel; to improve sidewalk accessibility for persons with disabilities; to facilitate ingress into and egress from vehicles, rights-of-way, buildings, and public spaces; to maximize use and promote maintenance of public rights-ofway, parks, the beach, and other public spaces; to help preserve and protect sensitive habitats, community landmarks, natural and scenic areas and the Monterey Bay National Marine Sanctuary; and to reduce the city’s exposure to civil liability, stationary sidewalk vending is not permitted in the following limited areas:
1) Year round, in areas on Pacific Avenue that are outside of the city-demarcated vending and display zones;
2) From November 1st through March 31st, on the streets and sidewalks of Beach Street between the Municipal Wharf and Third Street that are outside of the city-demarcated vending and display zones;
2)3) Year round, in any city park or beach where the City has entered into an agreement for concessions that exclusively permits the sale of food or merchandise by the concessionaire; Within five hundred feet of a permitted certified farmer’s market, a swap meet, or an area designated for a temporary special permit. This prohibition shall be limited to the operating hours of the farmer’s market or swap meet, or the limited duration of the temporary special permit;
3)4) Year round, in areas that are zoned exclusively residential, including within residentially zoned parks; and
4)5) Year round, within the city’s open space, natural, and scenic areas, which includes Arana Gulch, Pogonip, Moore Creek, the San Lorenzo Riverwalk, and the West Cliff Drive pedestrian/bike path.

20.17 b) For the same reasons identified in subsection (a), both stationary and roaming sidewalk vending shall not be permitted in the following limited areas:
1) From April 1st through October 31st, on the streets and sidewalks of Beach Street between the Municipal Wharf and Third Street;
2) Year round, on the vehicle and pedestrian thoroughfares of the Santa Cruz Municipal Wharf;
3) Year round, on that portion of Main Beach over which the city has an easement for recreation and beach purposes only pursuant to a 1933 superior court judgment quieting title to the Seaside Company, which mandates “that no peddling, soliciting or bartering shall be permitted thereon”;
4) Year round, on the Beach Street Promenade Deck; and
5) Year round, on a bike path, a street (including within on-street parking spaces), within a driveway, or in a public parking lot; and.
6) Within five hundred feet of a permitted certified farmer’s market, a swap meet, or an area designated for a temporary special permit. This prohibition shall be limited to the operating hours of the farmer’s market or swap meet, or the limited duration of the temporary special permit.
c) The city council, by resolution, may from time to time designate no vending or limited vending zones due to objective health, safety, or welfare concerns. In designating a no vending or limited vending zone, the city council shall first determine that vending without limitation in the area would impede or interfere with public health, safety, or welfare. d) This section shall not be construed as prohibiting events that are conducted pursuant to, and in accordance with, Chapters 10.64, Major Public Special Events, and 10.65, Public Gathering and Expression Events.

Section 4. Santa Cruz Municipal Code Section 5.82.090 “Vending in City Beaches and Parks” is hereby amended as follows:

5.82.090 VENDING IN CITY BEACHES AND PARKS.
a) An additional parks and recreation vending permit is required for sidewalk vendors who wish to operate in a city park, beach, or other facility within the jurisdiction of the parks and recreation department, including that portion of the Beach Street sidewalk operated by the parks and recreation department, between the Municipal Wharf and Third Street. No person may vend in a city park, city beach, or facility within the jurisdiction of the parks and recreation department without first obtaining a parks vending permit.

20.18 b) The director of parks and recreation, or their designee, may refuse to grant a parks vending permit if:
1) The sidewalk vendor does not yet have a sidewalk vending permit; or 2) If granting the parks vending permit would negatively impact objective health, safety, or welfare concerns; or
3) If denial is necessary to ensure the public’s use and enjoyment of natural resources or recreational opportunities; or
4) If denial of the permit is necessary to prevent an undue concentration of commercial activity that unreasonably interferes with the scenic and natural character of the park or beach; or
5) If the location of the proposed vending operations has already been approved for another use (including potentially other vending operations) at the time the applicant proposes to vend at the subject location; or
6) If the vending operations are illegal, or the city’s approval of the permit would be contrary to legal requirements imposed on the city.
c) If the permit is denied, written notice of such denial and the reasons therefor shall be provided to the applicant.
d) The director of parks and recreation, or their designee, may attach conditions to a parks vending permit. All conditions must be: (1) directly related to objective health, safety, welfare concerns, or directly related to legal requirements imposed on the city; or (2) necessary to ensure the public’s use and enjoyment of natural resources and recreational opportunities; or (3) necessary to prevent an undue concentration of commercial activity that unreasonably interferes with the scenic and natural character of the park. e) Any person aggrieved by a decision of the parks and recreation department to issue, deny issuance, condition, or rescind a parks vending permit may appeal the decision to the city manager or their designee within ten calendar days after receipt of the notice of denial, conditions, or revocation. The appeal hearing shall be conducted pursuant to the administrative enforcement hearing procedure contained in Title 4. If the appeal is successful, the hearing officer shall order the city to return the fee paid for appeal.

Section 5. Santa Cruz Municipal Code Section 5.82.120 “Impoundment” is hereby amended as follows:

5.82.120 IMPOUNDMENT.
a) The city may impound vending display devices, food, goods, and/or merchandise that:

20.19 1) Reasonably appear to be abandoned on public property; or 2) Are displayed, offered, or made available for rent or sale by a sidewalk vendor who (A) operates in violation of this chapter; and (B) refuses or fails to provide identification, as required by Section 5.82.110(f); and (C) refuses to remove their vending display device, food for sale, and/or goods/merchandise for sale after being instructed to do so by a city enforcement official; or 3) Are displayed, offered, or made available for rent or sale by a sidewalk vendor who (A) does not possess a valid applicable sidewalk vending permit (and/or, if applicable, a valid applicable parks vending permit); and (B) also refuses to remove their vending display device, food for sale, and/or goods/merchandise for sale after being instructed to do so by a city enforcement official; or 4) Is (A) creating an imminent and substantial safety or environmental hazard by the location of the vending display device or the nature of the goods being offered for sale, and (B) refuses to remove their vending display device, food for sale, and/or goods/merchandise for sale after being instructed to do so by a city enforcement official; or
5) Are displayed, offered, or made available for rent or sale by a sidewalk vendor who has, within a twenty-four-month period, been issued four three or more administrative citations for violations of this chapter. b) The city may immediately dispose of impounded materials that are perishable or cannot be safely stored.
c) An aggrieved vendor may, within ten days, appeal the impoundment of their property by requesting an administrative hearing before a hearing officer appointed by the city under Title 4, and if successful in their appeal, may have their property returned without paying an impound fee. The appeal hearing shall be conducted pursuant to the administrative enforcement hearing procedure contained in Title 4. Any appeal fee paid by the sidewalk vendor shall be returned to the sidewalk vendor if they are successful on appeal. d) An individual may recover impounded materials upon paying applicable impound fees and demonstrating proper proof of ownership.
e) The city council may by resolution adopt impound fees, which shall reflect the city’s enforcement, investigation, storage, and impound costs. f) Any unclaimed items will be considered abandoned and forfeited to the city after ninety days following impoundment.

20.20 Section 6. If any section or portion of this ordinance is found to be invalid by a court of competent jurisdiction, such finding shall not affect the validity of the remainder of the ordinance, which shall continue in full force and effect.

Section 7. This ordinance shall take effect and be in full force thirty (30) days after final adoption.

PASSED FOR PUBLICATION this 11th day of March, 2025, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

APPROVED: __________________________
Fred Keeley, Mayor

ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator

20.21 City Council

AGENDA REPORT
DATE: 03/04/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Fire Department/Police Department
SUBJECT: Public Safety Impact Fee Nexus Study and Proposed Fees Update (FD/PD) LOCATION: Citywide
RECOMMENDATION: This item is continued to the April 22nd Council meeting and will not be discussed on March 11th.

21.1 City Council

AGENDA REPORT
DATE: 02/10/2025
AGENDA OF: 03/11/2025
DEPARTMENT: Planning and Community Development
SUBJECT: 313 Swift Street (Application No. CP24-0104) – Assessor’s Parcel Number 003-161-32 – Request for 1) Acknowledgement of the Environmental Determination and Adoption of a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (MMRP) Pursuant to Section 15074 of the California Environmental Quality Act (CEQA); and 2) Consideration of the Application for a Planned Development Permit, Coastal Permit, Design Permit, and Heritage Tree Removal Permit to Allow Construction of a New, Four-Story, Approximately 120,604 SquareFoot Multifamily Educator Workforce Housing Project Encompassing Approximately 100 Residential Units, Approximately 119 Parking Spaces, New Landscaping, and Associated Site Modifications, Including the Removal of Up to Six (6) Heritage Trees, on a Site Located in the P-F/CZO (Public Facilities/Coastal Zone Overlay) Zoning District, Based on the Findings and Conditions of Approval Listed In Exhibit “A.” (Environmental Review: Initial Study/Mitigated Negative Declaration). (Applicant/Filed: Santa Cruz City School District/June 27, 2024) (PL) LOCATION: District 6
RECOMMENDATION: Motion to adopt a resolution acknowledging the environmental determination and adopting the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program (MMRP), and approving the Planned Development Permit, Coastal Permit, Design Permit, and Heritage Tree Removal Permit to allow construction of a new, four-story, approximately 120,604 square-foot multifamily educator workforce housing project encompassing approximately 100 residential units, approximately 119 parking spaces, new landscaping, and associated site modifications, including the removal of up to six (6) Heritage trees, on a site located in the P-F/CZ-O (Public Facilities/Coastal Zone Overlay) zone district, subject to the attached conditions of approval.

BACKGROUND: The applicant requests approval of a Planned Development Permit, Coastal Permit, Design Permit, and Heritage Tree Removal Permit to allow construction of a new, fourstory, approximately 120,604 square-foot multifamily educator workforce housing project encompassing approximately 100 residential units, approximately 119 parking spaces, new landscaping, and associated site modifications at 313 Swift Street, an approximately 4-acre property owned by Santa Cruz City School District. The subject site occurs on land bearing a

22.1 General Plan Land Use designation of CF (Community Facilities) and is situated within the P-F (Public Facilities) zoning district. Per City of Santa Cruz Municipal Code (SCMC) Section

24.04.130, a Planned Development Permit requires approval by the City Council, which, pursuant to SCMC 24.04.090, necessitates review at a public hearing. Under SCMC 24.04.150, when more than one permit is required and authority normally rests with more than one decisionmaking body, final action must be taken by the decision-making body with highest authority.

Thus, this Council action addresses all of the requested permits.

Public Outreach Meeting
Pursuant to the City’s Public Outreach Policy for Planning Projects, a community engagement meeting (hosted via internet video conference) was held on May 6, 2024. Approximately 43 members of the community attended, including the property owner/applicant, project architects, owners and occupants of units surrounding the project site, and residents from surrounding neighborhoods throughout the City. Participants offered diverse feedback, ranging from concerns regarding impacts of the project to loss of available on-street parking capacity and expectation for worsened neighborhood traffic, to remarks related to provision of affordable housing, queries regarding tenant selection criteria and ongoing housing opportunities for prospective future tenants of the development, and similar topics. Overall, attendee reactions ranged from mild concern to outright support.

Planning Commission Public Hearing
On February 6, 2025, the Planning Commission considered the environmental determination and permit applications at a duly-noticed public hearing. Topics of discussion included educators’ difficulty in securing affording housing within Santa Cruz, potential for the proposed project to create unintended impacts associated with educators’ dependency on the school district for the provision of housing, visibility of the project to the adjacent neighborhood, parking of vehicles and equipment during project construction, and maintenance of safe access to the pedestrian pathway during project construction, among others. Following deliberation, on a vote of 6-0-1-0 (Commissioner McKelvey absent), the Planning Commission recommended that the City Council acknowledge the environmental determination and approve the requested entitlements with revisions and additions to the attached conditions of approval, including addition of four conditions (related to the project’s provision of laundry microplastic filters and free METRO bus passes, maintenance of public access to the pedestrian pathway during project construction, and planting of at least six street trees) and modifications to one condition, granting the authority to the City’s Zoning Administrator to review final project materials proposed. Staff agrees with the additions and modifications, and they have been incorporated into the recommended conditions of approval in the attached resolution.

DISCUSSION: A full description and analysis of the proposed project, presenting an evaluation of its consistency with applicable Goals, Policies, and Actions of the General Plan and relevant provisions of the Municipal Code, including the City’s Objective Standards for Multifamily Development, is provided in the attached staff report to the Planning Commission dated February 6, 2025. The applicant requests the following:
 Planned Development Permit – required for consideration of the proposed land use; the General Plan Land Use designation of CF (Community Facilities) envisions land identified with this classification as “existing and potential community facilities,

22.2 including schools, government offices, community buildings such as the Civic Auditorium, sewer and water facilities, and the City landfill. Also applies to land used by State highways.” Residential use is not included among the categories of land uses encompassed by the CF General Plan Land Use designation; however, the provision of multifamily residential use to accommodate housing of school district personnel for longterm retention of employees clearly supports the school district’s mission of educating students. The P-F (Public Facilities) zoning district specifies categories of uses principally-permitted and conditionally-permitted. Per City of Santa Cruz Municipal Code (SCMC) Section 24.10.1770, “government facilities; local, state, and federal” and “school, public” constitute classes of land uses allowing for consideration via discretionary review, again, without residential use listed among them. A Planned Development Permit “provides variation on district regulation, where appropriate, in the following areas,” which includes “uses”; thus, the Planned Development Permit serves as a mechanism for consideration of multifamily workforce housing as proposed at the subject site.
 Coastal Permit – required for review “as a project undertaken by a public agency” (school district) per SCMC Section 24.08.230. The subject site falls within Coastal Overlay, Exclusion Area A, and a Coastal Permit must be obtained for the proposed scope of work, as the project does not meet the Coastal Permit exclusion criteria.  Design Permit – required for review of site and building design per SCMC Section

24.08.410 as a project wherein the applicant is a public agency over which the City may exercise land use controls, as a public project within the Coastal Zone, and as a project which requires a Planned Development Permit.
 Heritage Tree Removal Permit – required for review of proposed removal of up to six (6) Heritage trees at the subject site, per SCMC Section 9.56.060.

Applicable State Laws
 Government Code 65915: The project does not seek approval of a Density Bonus.  Government Code 65589.5: The Housing Accountability Act limits a local government’s ability to deny, reduce the density of, or make infeasible housing development projects, emergency shelters, or farmworker housing that are consistent with objective local development standards and contribute to meeting housing needs. This project proposes approval of a Planned Development Permit to allow for variations to objective standards, specifically, the use of the site for residential purposes, therefore, the City’s discretion is not limited under this section of the state law. However, the project is vested to the standards in place at the time of Preapplication completeness.

Planned Development Permit
Neither the General Plan, through the Community Facilities Land Use designation, nor the Zoning Ordinance, via the Public Facilities zoning classification, envision residential use at the subject site; however, as the proposed project comprises a multifamily educator workforce housing project intended to attract and retain employees of Santa Cruz City Schools, including teachers and support staff (i.e., certificated and classified staff), the proposed scope of work and

22.3 design can be considered via a Planned Development Permit as a use of the land supportive of, and contributory and complementary to, the school district’s mission as a public agency tasked with educating the residents it serves.

Per SCMC 24.08.700, the purpose of a Planned Development includes the following:
1) Provide an administrative technique to foster development plans for eligible lands which serve public objectives more fully than development plans permitted under conventional zoning regulations;
2) Establish criteria for identifying those parcels of land in the city which are eligible for the special procedures available to applicants proposing creative development plans requiring special review and approval procedures.

The City Council is requested to consider the use of the subject parcel as proposed via the application for Planned Development Permit, including the public benefits associated with the development.

As a contiguous site exceeding 4 acres in size and of approximately rectangular dimensions, the subject lot provides adequate size and an appropriate shape to accommodate “innovative and creative site planning,” while a team of two professional architecture firms with experience in formulation of educational facilities have spearheaded the proposed design and layout. Existing site topography will remain largely unchanged, and on-site natural features will remain intact to the extent practicable. The provision of affordable housing for educators serves a clear and demonstrable benefit to the public. Additionally, the project introduces a formal pedestrian footpath from Swift Street to Sergeant Derby Park, replacing the current, longstanding informal access path, thereby offering further public benefit.

As the subject parcel remains largely unused, development of the site for educator workforce housing facilitates appropriate infill development while retaining ample open space for future potential structures and site features and offering opportunity for active and passive recreation.

Further, by repurposing an existing site, the school district will avoid incurring additional costs associated with property acquisition while maintaining wise stewardship and effective utilization of its existing assets.

Zoning and General Plan Consistency
The project site occurs on land contained in the PF (Public Facilities) zone district and has a General Plan land use designation of CF (Community Facilities).

The project upholds consistency with the purpose of the General Plan Land Use designation of CF, described in the General Plan 2030 as below:
“Designates existing and potential community facilities, including schools, government offices, community buildings such as the Civic Auditorium, sewer and water facilities, and the City landfill. Also applies to land used by State highways.” Because the California Coastal Commission has not yet adopted the City’s General Plan 2030, and the subject site occurs on land within the Coastal Zone, the proposed project is additionally

22.4 evaluated for consistency with the City’s 1990-2005 General Plan (“2005 General Plan”). The subject site bears a Land Use Designation of “Community Facilities” pursuant to the 2005 General Plan.

The project exhibits consistency with the purpose of the General Plan Land Use designation of CF as identified in both current and former General Plan, conforming to, and fostering the attainment of, many goals and policies of both documents, as described at length in the attached Staff Report to the Planning Commission.

Design Permit
The proposed project requires approval of a Design Permit per SCMC Section 24.08.410 as a project wherein the applicant is a public agency over which the City may exercise land use controls, as a public project within the Coastal Zone, and as a project which requires a Planned Development Permit, as well as “for multiple dwellings and dwelling groups containing three or more dwelling units,” with the Design Permit intended to promote high quality of project design consistent with the standards for aesthetics typifying the Santa Cruz community. Staff have focused the Design Review on conformance of the proposal to the City’s Objective Design Standards for Multifamily Development (SCMC Section 24.12.185); an evaluation of the proposal reveals its consistency with applicable Objective Design Standards, as demonstrated in the attached compliance matrix.

As currently proposed, the project presents high quality of architecture and site design, satisfying the stated rationale of the requirement for Design Permit as identified in the SCMC and introducing a site configuration and building form aligned to the City’s Multifamily Objective Design Standards.

Coastal Permit
As proposed, the project avoids adverse impacts to views of, and public access to, the coast, and staff recommend that the Council make the findings to support approval of a Coastal Permit, as described in the attached resolution and as further detailed in the Planning Commission staff report.

Heritage Tree Removal Permit
A Heritage Tree Removal Permit is required for removal of up to six (6) Heritage trees at the subject site per City of Santa Cruz Municipal Code Section 9.56.060 due to conflicts with the location of the proposed building and associated site improvements. The submitted arborist report further recommends elimination of one additional Heritage-sized tree located on the adjacent lot immediately south of the subject site, which is also owned by the school district.

Removal of this tree on the adjacent property is not part of the subject approval and will be addressed through separate permits, should the school district seek to remove it. Conditions of approval require replacement of any tree removed with minimally two trees of at least 24-inch box-size, including foliage varieties supportive of monarch butterfly populations.

22.5 Affordable Housing
SCMC Section 24.16.020 generally requires that residential developments creating five or more new residential dwelling units provide at least 20% of their dwelling units as inclusionary (affordable) units, which must be made available for lease to low-income households at an affordable rent. Inclusionary units are restricted in perpetuity to households earning 80% or less of the Area Median Income (AMI).

As an alternative to the aforementioned requirement, SCMC 24.16.030(10)(b) offers the following means of compliance, applicable only to school-district employer-sponsored housing:
 School district employer sponsored housing projects conforming to the requirements of the Teacher Housing Act of 2016 (Health and Safety Code Section 53570 et seq. or successor provisions) will be deemed to satisfy the inclusionary housing requirements of this chapter. For any such projects, an agreement must be executed to formalize that the project has met this alternate means of compliance, and annual compliance reports must be submitted to confirm compliance with the affordability provisions of the Teacher Housing Act of 2016.

The applicant has invoked the above provision, declaring the intent to pursue provision of all 100 residential units with rent restricted to a maximum of approximately 60% to 65% of market rate to serve the target population. Such rent restriction stems from compliance with the Teacher Housing Act of 2016, which defines “affordable rental housing” pursuant to Health & Safety Code Section 53572(a) as rental housing “with a majority of its rents restricted to levels that are affordable to persons and families of low or moderate income”. Conditions of approval require that the project provide full conformance with the Teacher Housing Act of 2016, bolstered through mandatory submittal of an affordable housing agreement acceptable to the City prior to issuance of any Building Permit related to the project and provision of annual reports demonstrating compliance with applicable State law.

CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DETERMINATION: The California Environmental Quality Act (CEQA) serves to disclose and mitigate potential environmental impacts of activities, including development projects. For assessment of the proposed project’s likelihood for impact to the environment, an Initial Study of Environmental Impact (Initial Study), dated December 2024, was prepared by consulting firm Dudek, pursuant to CEQA Guidelines Section 15074. Among other criteria, the Initial Study includes an evaluation of the project’s potential for “conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance), through a determination of whether the proposed project would not be inconsistent with any such plan or policy.

The Initial Study indicates that the project holds the potential to generate significant environmental impacts, but which can be mitigated to levels below established thresholds of significance through the adoption and incorporation of appropriate mitigation measures.

Consequently, a Mitigated Negative Declaration (MND) has been prepared in accordance with the procedures directed in CEQA to assess, disclose, and mitigate the potentially significant environmental impacts of the entire scope of the proposed project. The Draft MND, attached, identifies potentially significant environmental impacts related to hazardous materials associated with the site’s past use by the US Army Reserve. The analysis contained in the IS/MND

22.6 concludes that the proposed project will not induce a significant impact on the environment with mitigation measures implemented related to soil remediation, testing, and management. All mitigation measures included in the MND have been included in a Mitigation Monitoring and Reporting Program (MMRP) and incorporated as project conditions of approval.

A Notice of Intent to adopt a Mitigated Negative Declaration (NOI) was prepared and filed with the Santa Cruz County Clerk and submitted to the State Department of Land Use and Climate (formerly Governor’s Office of Policy and Research) Clearinghouse on December 16, 2024, initiating a 30-day period of circulation allowing for public comment through January 15, 2025.

In response, letters were received from the California Department of Conservation, dated January 10, 2025; California Department of Fish and Wildlife dated January 10, 2025, and Stephen Svete, dated January 15, 2025. None of the correspondence submitted raised concerns regarding the project’s potential to effect environmental impacts not already addressed in the Initial Study and Mitigated Negative Declaration.

With adoption and implementation of the recommended mitigation measures, the Findings of Fact under CEQA conclude that the proposed project will have no significant adverse impact on the environment.

HEALTH IN ALL POLICIES (HiAP): HiAP is a collaborative approach to improving the health of all people by incorporating health considerations into decision-making across sectors and policy areas. HiAP rests on three pillars: equity, public health, and sustainability. HiAP serves to ensure that all decision-makers remain informed about the health, equity, and sustainability impacts of various policy options during the policy development process. The proposed project supports the pillar of equity by providing rental units on an infill site within a developed locale improved with sidewalks and street trees and offering direct access to public transportation, commercial goods and services, and recreational areas, including ample opportunities for recreation and respite provided by virtue of the site’s proximity to the Pacific Ocean. Through the incorporation of bicycle parking and pedestrian connections, the redevelopment fosters improved public health by promoting use of alternative modes of transportation in a resource-rich environment encouraging active transportation and outdoor recreation. Additionally, the construction of residences on an existing low-performing, underutilized site upholds sustainability through intensified development of land in a locale surrounded by urban uses and served by existing utilities and transportation infrastructure. As such, the project fortifies the three pillars of HiAP and demonstrates efficient and judicious use of the subject property.

The proposed project offers affordable housing for educators of the City while maximizing provision of off-street parking, preservation of open space, connectivity to surrounding land uses, and compatibility with the built environment in the vicinity of the subject site. Through supply of residential units dedicated to teachers and school district personnel, the project bolsters stability in staffing which benefits both students and the broader community through preparation of the local populace for successful entry into, and contribution to, the area’s economy via provision of a well-trained local workforce, while enhancing use of an underutilized site, facilitating appropriate infill development, and ensuring wise stewardship of public assets.

22.7 FISCAL IMPACT:

1. The recommendation in this report impacts the General Fund: Yes

2. This recommendation requires a budget adjustment: No

3. The recommendation creates an on-going expenditure commitment: No FISCAL IMPACT DESCRIPTION: The applicant has paid fees to compensate for costs associated with staff’s processing of this application. The project, if approved, will contribute to increased property tax revenue to the City, and the applicant/developer will be required to pay City impact fees, generating additional sources of funding for municipal services. Over time, residential projects have the potential to have a net negative impact on the City’s general fund due to the range of services provided to residents.

Prepared By:

Timothy Maier
Senior Planner
Submitted By:

Lee Butler
Director of Planning and
Community Development
Approved By:

Matt Huffaker
City Manager
ATTACHMENTS:

1. DRAFT RESOLUTION.DOCX

2. PROJECT PLANS, PREPARED BY EHDD, DATED NOVEMBER 1, 2024 (PART 1).PDF

3. PROJECT PLANS, PREPARED BY EHDD, DATED NOVEMBER 1, 2024 (PART 2).PDF

4. ARBORIST REPORT, PREPARED BY NIGEL BELTON, DATED MAY 24, 2023.PDF

5. NOISE EVALUATION (BASIS OF DESIGN), PREPARED BY SMITH, FAUSE, AND MCDONALD, INC. (UNDATED).PDF

6. GEOTECHNICAL AND GROUNDWATER FIELD EXPLORATION AND EVALUATION REPORT, DATED FEBRUARY 14, 2024.PDF

7. PHASE I ENVIRONMENTAL SITE ASSESSMENT, PREPARED BY MOORE TWINING ASSOCIATES, DATED JUNE 21, 2023 (PART 1).PDF

8. PHASE I ENVIRONMENTAL SITE ASSESSMENT, PREPARED BY MOORE TWINING ASSOCIATES, DATED JUNE 21, 2023 (PART 2).PDF

9. PHASE I ENVIRONMENTAL SITE ASSESSMENT, PREPARED BY MOORE TWINING ASSOCIATES, DATED JUNE 21, 2023 (PART 3).PDF

10. PHASE II ENVIRONMENTAL SITE ASSESSMENT, PREPARED BY MOORE TWINING ASSOCIATES, DATED OCTOBER 22, 2024.PDF

11. TRIP GENERATION MEMORANDUM PREPARED BY FEHR AND PEERS TRANSPORTATION CONSULTANTS, DATED OCTOBER 25, 2024.PDF

12. INITIAL STUDY OF ENVIRONMENTAL SIGNIFICANCE, PREPARED BY DUDEK, DATED DECEMBER 12, 2024.PDF

13. MITIGATED NEGATIVE DECLARATION, PREPARED BY DUDEK DATED DECEMBER 10, 2024.PDF

14. MITIGATION MONITORING AND REPORTING PROGRAM, PREPARED BY DUDEK, DATED JANUARY 24, 2025.PDF

15. TABLE DEMONSTRATING PROJECT COMPLIANCE WITH OBJECTIVE DESIGN STANDARDS FOR MULTIFAMILY DEVELOPMENT.PDF

16. STAFF REPORT TO THE PLANNING COMMISSION DATED FEBRUARY 6, 2025.DOCX

17. FEBRUARY 6, 2025 PLANNING COMMISSION MEETING ACTION SUMMARY.PDF

18. PUBLIC CORRESPONDENCE.PDF

22.8 DRAFT RESOLUTION NO.

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CRUZ

ACKNOWLEDGING THE CEQA DETERMINATION AND APPROVING A PLANNED

DEVELOPMENT PERMIT, COASTAL PERMIT, DESIGN PERMIT, AND HERITAGE

TREE REMOVAL PERMIT TO ALLOW A NEW, FOUR-STORY, APPROXIMATELY 120,604 SQUARE-FOOT MULTIFAMILY EDUCATOR WORKFORCE HOUSING PROJECT ENCOMPASSING APPROXIMATELY 100 RESIDENTIAL UNITS, APPROXIMATELY 119 PARKING SPACES, NEW LANDSCAPING, AND ASSOCIATED SITE MODIFICATIONS, INCLUDING THE REMOVAL OF SIX(6) HERITAGE TREES, ON A SITE LOCATED AT 313 SWIFT STREET (APPLICATION NO. CP24-0104) WHEREAS, on April 10, 2024, a Preapplication was submitted for proposed development of a multi-story, multifamily workforce housing development with approximately 80 units accommodating school district personnel on a site located at 313 Swift Street (CP24-0073); WHEREAS, on May 6, 2024, consistent with the City’s Public Outreach Policy for Planning Projects, a community engagement meeting (hosted via Internet video conference) was held to allow for early input from the public related to the project; WHEREAS, on June 27, 2024, a formal application was submitted for proposed construction of a new, four-story, approximately 120,604 square-foot multifamily educator workforce housing development encompassing 100 residential units, 119 parking spaces, new landscaping, and associated site modifications, including the removal of six (6) Heritage (CP24- 0104);
WHEREAS, on July 22, 2024, a Preapplication was submitted pursuant to California State Senate Bill 330 (SB330), which Preapplication was deemed complete on December 2, 2024; WHEREAS, on February 6, 2025, at a duly-noticed public hearing, the Planning Commission considered, and, on a vote of 6-0-1-0, recommended to the City Council acknowledgement of the environmental determination and approval of a Planned Development Permit, Coastal Permit, Design Permit, and Heritage Tree Removal Permit; WHEREAS, an Initial Study of Environmental Impact (Initial Study) dated December 2024 was prepared by consulting firm Dudek for assessment of the proposed project’s likelihood for impact to the environment, revealing that the project holds the potential to generate significant environmental impacts which can be mitigated to levels below established thresholds of significance through the implementation of appropriate mitigation measures. Consequently, a Mitigated Negative Declaration (MND) was prepared in accordance with the procedures directed in CEQA, to assess, disclose, and mitigate the potentially significant environmental impacts of the entire scope of the proposed project, providing the opportunity for review and comment by the public;

22.9 RESOLUTION NO.
2 WHEREAS, on December 16, 2024, a Notice of Intent to adopt a Mitigated Negative Declaration (NOI) was filed with the Santa Cruz County Clerk and submitted to the State Department of Land Use and Climate (formerly Governor’s Office of Policy and Research) Clearinghouse, initiating a 30-day period of circulation allowing for public comment through January 15, 2025;
WHEREAS, several letters of correspondence were submitted in response to the Initial Study and Mitigated Negative Declaration, including comments from two (2) external agencies and one (1) private party. Letters were received from the California Department of Conservation, dated January 10, 2025; California Department of Fish and Wildlife dated January 10, 2025, and Stephen Svete, dated January 15, 2025. None of the correspondence contained concerns regarding potential for environmental impacts not already addressed in the Initial Study and Mitigated Negative Declaration;
WHEREAS, a Mitigation Monitoring and Reporting Program (MMRP) has been prepared by consulting firm Dudek to ensure compliance with the required mitigation measures, with such mitigation measures included as project conditions of approval; WHEREAS, the City Council now makes the following findings:

With Respect to the Mitigated Negative Declaration
The City Council has considered the Mitigated Negative Declaration together with comments received during the public review process and responses and supporting documentation provided and finds, on the basis of the whole record before it, that there is no substantial evidence that the project will have a significant effect on the environment, and that the Mitigated Negative Declaration reflects the City’s independent judgment and analysis.

FINDINGS
Planned Development Permit, Section 24.08.770

1. Is consistent with the General Plan, the Local Coastal Land Use Plan, and adopted area plans.

The subject parcel has a General Plan land use designation of CF (Community Facilities), which envisions land identified with this classification serving as, “existing and potential community facilities, including schools, government offices, community buildings such as the Civic Auditorium, sewer and water facilities, and the City landfill. Also applies to land used by State highways.” Residential use is not included among the categories of land uses encompassed by the CF General Plan Land Use designation; however, provision of multifamily residential use to accommodate housing of school district personnel for long-term retention of employees supports the school district’s mission of educating students.

The proposed project is consistent with the policies of the General Plan, including the following:

22.10 RESOLUTION NO.
3 Goal LU1 Sustainable Land Uses
 Policy LU1.1: Relate residential, commercial and industrial land use intensities to the capability and location of the land while ensuring optimum utilization of infill parcels.  Policy LU3.7: Encourage higher-intensity residential uses and maximum densities in accordance with the general plan land use designations.

Goal LU3 A complementary balance of diverse land uses
 Policy LU3.1: Foster land use patterns that balance economic, housing, community, and environmental needs, and promote social diversity.

Goal CC2 Comprehensive community facilities and services  Policy CC2.1 Provide community services and facilities in keeping with the needs of a growing and diverse population
Goal CC8 Excellent educational opportunities and resources  Policy CC8.1: Cooperate with public and private institutions seeking to meet their educational objectives.

Goal CD1 A built environment in harmony with its natural setting  Policy CD1.2: Ensure that the scale, bulk, and setbacks of new development preserve important public scenic views and vistas.
 Policy CD1.3. Ensure that development is designed to be in harmony with natural topography and vegetation.

Goal M1 Land use patterns, street design, parking, and access solutions that facilitate multiple transportation alternatives
 Policy M1.6: Design parking areas and parking garages that are safe, pleasant and easy to use.

Goal M4 A citywide interconnected system of safe, inviting, and accessible pedestrian ways and bikeways
 Policy M4.1: Enable and encourage walking in Santa Cruz Goal NRC5 An enhanced and sustainable urban forest
 Policy NRC5.1: Protect and manage tree resources in the urban environment, with emphasis on significant and heritage trees.

Goal PR1 Ample, accessible, safe, and well-maintained parks, open space, and active recreational facilities
 PR1.7: Require developers to mitigate the impacts of their property improvements on city parks, recreation facilities and open space areas.

Goal ED4 A skilled, educated, and diverse local workforce  Policy ED4.2 Retain and expand the existing base of medium and large employers in Santa Cruz

22.11 RESOLUTION NO.
4  Policy ED4.1 Promote the education and training of the workforce to meet the needs of emerging economies.

The proposed project advances the above goals and policies of the General Plan and conforms to the purpose of the P-F (Public Facilities) zone district, “to designate public buildings and facilities and to ensure that there is a compatible relationship between such uses and the surrounding area”.

No area plan applies to the project site.

2. Is consistent with the purpose of this chapter and other applicable sections of this title.

The P-F (Public Facilities) zoning district specifies categories of uses principally-permitted and conditionally-permitted. Per City of Santa Cruz Municipal Code Section 24.10.1770, “government facilities; local, state, and federal” and “school, public” appear among the classes of land use accommodate by the district via discretionary review, without residential uses listed among them.

A Planned Development Permit “provides variation on district regulation, where appropriate, in the following areas”, including “uses”, thus providing a mechanism for consideration of multifamily workforce housing project as proposed at the subject site.

As prescribed by the Municipal Code, “the land area subject to planned development permit shall comprise at least twenty thousand square feet”. With a lot size in excess of four acres, the project fulfills the criterion for minimum land area. Further, the Planned Development Permit requires that “the applicant owns or controls the land subject to the planned development permit application”. As Santa Cruz City Schools holds the subject lot in fee-simple ownership, the school district will retain control of project entitlement, construction, and long-term operation and management, satisfying the above finding.

3. Includes planned variations to underlying district regulations which serve public purposes to an equivalent or higher degree than would underlying district regulations.

As an approximately 4.08-acre, generally rectangular, contiguous site, the subject lot provides adequate size to accommodate a creative and innovative design, while a team of two professional architecture firms with experience in designing educational facilities have devised the proposed site configuration, building forms, and architecture. The provision of affordable housing for educators provides a clear and demonstrable benefit to the public. Existing site topography will remain largely unchanged, while on-site natural features will remain intact to the extent practicable.

The inclusion of 119 off-street, surface parking spaces for residents and employees of the new residential building, will offset increased demand for on-street parking in the surrounding residential neighborhoods. Provision of ample open space and landscape areas on the site for the enjoyment and benefit of the building’s inhabitants and their guests offers a visual benefit to neighboring properties, both enhancing the local environment and offering greater access to neighboring Sergeant Derby Park.

The proposed project introduces an infill residential development of high density within a minimal building footprint in the context of a site plan integrating generous vehicular and bicycle parking

22.12 RESOLUTION NO.
5 providing connectivity to surrounding destinations in a location well-served by public transit, while offering affordable residences to educators and support staff, thereby reducing school staffing turnover due to high housing costs.

4. Can be coordinated with existing and proposed development of surrounding areas.

The proposed project will maintain a balance of scale, form and proportion to both the existing site and neighboring properties in a variety of ways. Through removal of dated, underutilized, low-density, under-performing buildings, the project will allow for better use of a constrained property while continuing the residential character of the site and maintaining cohesiveness to surrounding uses. Minor regrading of the project area and setting of new surface material will combine for improved circulation and site access conducive to a high-density commercial/ residential use. New rooftop mechanical equipment and all ground-mounted equipment and utility installations will be required to be fully screened from view from surrounding properties and public rights-of-way.

Santa Cruz City Schools retains ownership of the parcel immediately to the south of the subject parcel, which contains an existing school; future plans for the adjacent lot envision retention of the existing school facilities. Additionally, no application for development of the properties to the north of the subject lot been received by the City, and reasonably foreseeable future conditions include retention of the existing industrial uses on parcels adjoining the project site. Surrounding residential neighborhoods will very likely continue such existing land uses for decades into the future. The proposed development therefore demonstrates coordination with existing and proposed development of land within the vicinity of the subject site.

5. Overall, the amenity level of the development and the amount of open space shall be greater than what would have been permitted by the underlying district regulations.

SCMC 24.10.1790 does not specify open space requirements in the district regulations for the PF district, and, therefore, pursuant to the Municipal Code, no minimum open space requirement pertains. Through provision of 51,200 square feet of common open space and 1,800 square feet of private open space dedicated to ground-floor units, the project provides, on average, 5,300 square feet of open space per residential unit, offering generous opportunities for respite and access by residents and visitors to both active and passive recreation opportunities. Including a direct connection to Sergeant Derby Park, and by virtue of the site’s proximity to the Pacific Ocean, access to natural amenities remains intrinsic to the project’s location. With a proposal for planting of the number of trees as proposed, the project additionally enhances the site and surroundings through integration of features offering visual beauty and connection to nature.

Coastal Permit, Section 24.08.250

6. Maintain views between the sea and the first public roadway parallel to the sea;

22.13 RESOLUTION NO.
6 Situated at the southwest corner of Delaware Avenue and Swift Street, surrounded by established industrial and residential uses, approximately a third-mile north of the Pacific Ocean, the proposed project will not impact views between the sea and the first public roadway parallel to the sea.

7. Protect vegetation, natural habitats and natural resources consistent with the Local Coastal Land Use Plan;
The subject site falls outside areas mapped for sensitive biological resources per General Plan 2030; however, the northeasterly corner of the site occurs with an area mapped as habitat potentially supportive of monarch butterfly habitat per General Plan 2005, with which the project must demonstrate compliance. Biotic consulting firm Ecosystems West has deemed that the project would induce no potential impact to potential monarch butterfly habitat or overwintering capacity. Conditions of approval require submittal of a formal biotic report to document such findings and ongoing compliance with the consultant’s recommendations.

The proposed project falls within an urbanized area, with a number of properties separating the subject site from surrounding sensitive habitat and identified waterways. The site carries no General Plan 2030 designation identifying it as a location potentially containing valuable or rare habitat, nor does it connect directly to other areas of natural habitat. The project will additionally have no effect on wildlife movement.

8. Be consistent with any applicable design plans and/or area plans incorporated into the Local Coastal Land Use Plan;
No design or area plan pertains to the subject site; therefore, the above finding remains inapplicable.

9. Maintain public access to the coast along any coastline as set forth in the Local Coastal Land Use Plan;
The project is set approximately a third mile from the coast and will not impair public access to the shore; rather, through development of 100 new residential units, the project will locate additional population proximate to the shore, thereby improving access to coastal resources. The project would maintain and not disrupt, but, rather, enhance existing circulation patterns due to incorporation of a new, widened sidewalk, new drive aisle, and multiple pedestrian pathways, including a formalized pathway continuing access from Swift Street to Sergeant Derby Park, thus introducing augmented internal and external connectivity. The project site is additionally positioned within an urbanized area in close proximity to employment, commercial goods and services, and recreational resources, facilitating the use of alternative modes of transportation.

10. Be consistent with the Local Coastal Land Use Plan goal of providing visitor-serving needs as appropriate;
The project includes 100 new affordable housing units, consistent with the allowances of the Municipal Code, including the City’s Multifamily Objective Design Standards, providing enhanced residential capacity in close proximity to surrounding retail, employment, and other

22.14 RESOLUTION NO.
7 services. The project site will likely draw some visitors; however, the project objectives do not directly relate to visitor-serving development.

11. Be consistent with the Local Coastal Land Use Plan goal of encouraging coastal development uses as appropriate.

The project affords consistency with the goal of encouraging coastal development uses, in that the proposed development will enhance access to the seashore by expanding the population in an area within walking and biking distance to the coast. No coastal resources will experience adverse effect, as the project will avoid impact to any coastal scenic viewsheds, the development is located a significant distance from designated sensitive environments, and the proposed design minimizes removal of Heritage trees, thus minimizing detrimental consequences to local ecology, the subject site, and its vicinity. The proposed building will additionally remain sympathetic to surrounding development with regard to mass and height.

Design Permit, Section 24.08.430

12. The site plan and building design are consistent with design and development policies, limited to those policies that constitute objective standards therein when required by state law, of the General Plan, any element of the General Plan, and any area plan, specific plan, or other city policy for physical development. If located in the Coastal Zone, the site plan and building design are also consistent with policies of the Local Coastal Program.

The project complies with all applicable objective standards. The subject site falls within the P-F (Public Facilities) zone district, governed by sparse development standards as identified in the Municipal Code; however, SCMC 24.12.185 contains a variety of objective criteria pertinent to project design. The proposed development achieves compliance with all such objective standards.

The project would replace aging features and fixtures with upgraded facilities at a site bounded on all sides by existing buildings of similar scale and range of land uses. Removal of assorted modular buildings and replacement with a new development boasting modern architecture and extensive amenities will maintain the existing land use and retain compatibility with the nature of surrounding uses of residential character, while avoiding spillover effects inducing detrimental effects to surrounding land uses. The project layout will allow for improved use of the site for public facilities use and maintain compatibility in design and utility of neighboring properties.

Building color and texture will complement adjacent topography to blend into the natural environment to the extent possible, in conformance to the appearance of the surroundings to achieve a design aesthetic in keeping with the high standards of the Santa Cruz visual environment and community expectations.

The project site plan demonstrates consistency with, and will facilitate achievement of, the goals, policies, and actions of General Plan 2005 and General Plan 2030, both of whose Land Use Maps designate the land including the subject parcel as “Community Facilities.” Construction of new, modern, amenity-rich residential units to replace existing on-site trailers, and reconfiguration of on-site parking, will provide improved utility of the site and provide for a more uniform, cohesive

22.15 RESOLUTION NO.
8 exterior appearance consistent with the bulk, mass, and architecture of existing, surrounding uses.

As proposed, the project will, therefore, 1) attain General Plan Goal CD-1 by promoting “a building environment in harmony with its natural setting;” 2) advance Policy CC2.1 to “provide community services and facilities in keeping with the needs of a growing and diverse population; and 3) support Policy CC2.1.1 to “update and replace facilities consistent with the General Plan Policy”. Consistency with the General Plan and other applicable regulations is further articulated in the project plans, staff reports, website materials for the project, public hearing presentations, and conditions of approval, and elsewhere in these findings.

13. The site plan and building design are in full conformance with the design standards of Section 24.12.185.

The proposed site plan and building design demonstrate consistency with the City’s Objective Design Standards for Multifamily Development as promulgated in Section 24.12.185 of the Municipal Code. The subject site occurs on land within the P-F (Public Facilities) zone district, and the project design complies with all applicable criteria of SCMC 24.12.185. In particular, revisions to the project design as initially submitted have been made to effect full compliance with the Objective Design Standards for Multifamily Development, as follows:

SCMC 24.12.185.4.d.: The project provides a new bicycle/pedestrian pathway through the subject site, 5 feet in width per minimum standards of the Public Works Department, thereby formalizing a long-standing access through the property from Swift Street to Sergeant Derby Park.

SCMC 24.12.185.4.e.: The sidewalk adjacent to Swift Street will measure minimally 8 feet in width as required, with dedication of land, or recordation of an easement to effectuate such widening.

SCMC 24.12.185.7: The submitted plan provides enclosures for refuse bins as set forth in the City of Santa Cruz Department of Public Works Refuse Container Storage Facility Standard Design Policy
SCMC 24.12.185.10: The easterly elevation of the east wing has been modified to incorporate six roof forms along the predominant building face, and the southeasterly elevation of the west wing has been updated to incorporate seven roof forms along the predominant building face per SCMC 24.12.185(10)(a).

The proposed roof form has additionally been revised to include a difference in height of at least three feet per roof form per SCMC 24.12.185(10)(b)(v).

SCMC 24.12.185.12: The form of the building has been revised to provide modulation of building faces greater than 30 feet in length, as required.

SCMC 24.12.185.16: As conditioned, a lighting plan fully compliant with the referenced Municipal Code provisions will be submitted.

22.16 RESOLUTION NO.
9 The project has been thoughtfully designed for consistency with applicable Municipal Code requirements and applicable provisions of the Building and Fire Codes. Through iterative revision, the proposed design ensures preservation of existing trees and prevents adverse impacts to natural resources to the degree possible. The design of the project and all landscaping will enhance the aesthetics of the project site and allow for an intensity of use and activity appropriate for the site’s industrial and residential surroundings, while site improvements will combine for improved circulation and site access.

The project scope of work includes new landscaping integrating native vegetation and low wateruse, drought-tolerant plant varieties. The project will further be required to comply with all applicable provisions of Municipal Code Chapter 16.16, Water-Efficient Landscaping, related to regulation of landscape design, construction, and maintenance, thereby promoting efficient water use, facilitating management of peak season water demand, and assisting with the preservation of water storage to ensure a reliable and adequate public water supply. The application has been conditioned to provide a final landscape plan for review and approval with the building permit plans.

Through removal of underutilized buildings and a largely abandoned surface parking lot, the proposed project will allow for better use of the subject property while maintaining cohesiveness to surrounding uses. Provision of 100 new residential units to house educators and support staff will provide residences tailored to the needs of the Santa Cruz City School District, intended for attraction and retention of a high-quality workforce while adding to the stock of affordable housing providing accommodations for an underserved segment of the community, demonstrating clear benefits to the public.

Heritage Tree Removal Permit, Chapter 9.56, City Council Resolution No. NS-23, 710

14. A heritage tree or shrub, as defined in Chapter 9.56 of the City of Santa Cruz Municipal Code shall only be altered or removed in the following circumstances:
a) Alteration of a heritage tree or shrub would only affect less than twenty-five percent (25%) of the crown of said heritage tree or heritage shrub; b) Findings by the Director of Parks & Recreation can be established in conformity with the City’s Urban Forest and Wildland Interface Policy Statement; c) One or more of the following findings are established by the applicant and confirmed by the Director of Parks & Recreation:
1) The heritage tree or heritage tree shrub has, or is likely to have, an adverse effect upon the structural integrity of a building, utility, or public or private right of way;
2) The physical condition or health of the tree or shrub, such as disease or infestation, warrants alteration or removal;
3) A construction project design cannot be altered to accommodate existing heritage trees or heritage shrubs.

The arborist report prepared by ISA Certified Arborist Nigel Belton dated May 24, 2023, confirms that six (5) trees, 14 inches diameter (or greater), located within the project work area, will present locational conflicts with the proposed building, with the removal of such trees therefore

22.17 RESOLUTION NO.
10 recommended. Additionally, one tree appears in poor condition as demonstrated in the submitted arborist report and not suitable for retention in the project. Thus, the number of Heritage trees recommended for removal because of high construction impacts or poor condition totals six (6).

The project design has elicited mindful review of available options resulting in minimal impacts to existing trees. A condition of approval requires replacement of each tree proposed to be removed at a ratio of two, 24-inch-box-sized trees. Given the disparate arrangement of trees throughout the parcel and the objective of maintaining minimal impact to existing foliage, the project balances the potentially conflicting motivations of retention of existing trees and provision of affordable housing.

Alternative Methods to Comply with Inclusionary Housing Requirements, Section 24.16.030

15. The proposal for the alternative method of compliance is consistent with the Santa Cruz General Plan and all of its elements.

The applicant has invoked SCMC 24.16.030(10)(b), stating the intent to pursue provision of all 100 residential units at the Low/Moderate Income level to serve the target population, thus providing a functional alternative to, and exceeding the minimum requirements of, SCMC

24.16.020, which requires 20% of dwelling units serve as inclusionary units in a project with five or greater residential units. Rents will be restricted to 60% to 65% of market rate. A condition of approval requires that the project maintain full conformance with the Teacher Housing Act of 2016, which legislation requires the majority of units remain restricted to rents affordable to low or moderate income persons or families as defined in Health and Safety Code 50093. A further condition of approval requires submittal of an affordable housing agreement acceptable to the City prior to issuance of any Building Permit related to the project, as well as submittal of annual reports demonstrating compliance with applicable State law. Such approach will advance goals of the General Plan regarding provision of affordable housing, particularly for local employees, as previously referenced in the findings contains herein.

16. The proposal conforms to the standards established for inclusionary units in Section

24.16.025, unless the alternative method does not require compliance with that section.

The proposed project will conform to all standards of SCMC 24.16.025. Distribution of residential units of various types throughout the development will avoid an overconcentration of any particular unit type, and all units will uphold consistency in exterior appearance, materials, and finished quality, in keeping with the intent of the Municipal Code related to equitable distribution and presentation of residential units. Submittal of an affordable housing agreement, subject to review by City staff and the City Attorney’s Office, will ensure compliance with all applicable provisions of the Municipal Code, including SCMC 24.16.025. Conditions of approval additionally ensure ongoing conformance with the Teacher Housing Act of 2016.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Santa Cruz hereby acknowledges the CEQA determination and approves the Planned Development Permit,

22.18 RESOLUTION NO.
11 Coastal Permit, Design Permit, and Heritage Tree Removal Permit to allow a new, four-story, approximately 120,604 square-foot multifamily educator workforce housing project encompassing approximately 100 residential units, approximately 119 parking spaces, new landscaping, and associated site modifications, including the removal of six(6) Heritage trees, on a site located at 313 Swift Street, subject to the analysis included in the associated staff report and the Conditions of Approval listed in Exhibit “A,” attached hereto and made a part hereof. All environmental documents and other materials that constitute the record of proceedings upon which this decision is based, are made available at the City of Santa Cruz Planning and Community Development Department Office, 809 Center Street, Room 101, Santa Cruz, California 95060.

PASSED AND ADOPTED this ___ day of _________, 2025, by the following vote:

AYES:

NOES:

ABSENT:

DISQUALIFIED:

APPROVED: ______________________________
Fred Keeley, Mayor
ATTEST: _________________________________
Bonnie Bush, City Clerk Administrator

22.19 RESOLUTION NO.
12 RESOLUTION NO.

EXHIBIT “A”
CONDITIONS OF APPROVAL* FOR THE PROJECT ON PROPERTY AT
313 Swift Street (CP24-0104)
Planned Development Permit, Coastal Permit, Design Permit, and Heritage Tree Removal Permit to allow a new, four-story, approximately 120,604 square-foot multifamily educator workforce housing project encompassing approximately 100 residential units, approximately 119 parking spaces, new landscaping, and associated site modifications, including the removal of six (6) Heritage trees, on a site located in the P-F/CZ-O (Public Facilities/Coastal Zone Overlay) zone district
*The following conditions of approval are recommended to be incorporated into the final list of conditions of approval adopted by the City Council.

1. If one or more of the following conditions is not met with respect to all its terms, then this approval may be revoked.

2. All plans for future construction which are not covered by this review shall be submitted to the City Planning and Community Development Department for review and approval.

3. This permit shall be exercised within three (3) years of the date of final approval, or it shall become null and void. When a building permit is required, a zoning permit shall be considered exercised following the issuance of a valid building permit.

4. If, upon exercise of this permit, this use is at any time determined by the Planning Commission to be incompatible with the surrounding neighborhood, revocation of, or amendment to, this permit by the City Council could occur.

5. The use shall meet the standards and shall be developed within limits established by Chapter

24.14 of the Santa Cruz Municipal Code as to the emission of noise, odor, smoke, dust, vibration, wastes, fumes or any public nuisance arising or occurring incidental to its establishment or operation.

6. The applicant shall be responsible for the completeness and accuracy of all forms and supporting material submitted in connection with any application. Any errors or discrepancies found therein may result in the revocation of any approval or permits issued in connection therewith.

7. Grading, drainage and erosion control plans shall be prepared by a professional engineer in conjunction with a soils engineer to minimize erosion and risks of construction on sloping topography.

22.20 RESOLUTION NO.
13 8. Plans submitted for building permit issuance shall comply with all recommendations of the Final Environmental Impact Report and Mitigation and Monitoring Reporting Program, including all technical memoranda, as approved by the City Council.

9. Prior to building permit issuance or any ground disturbance on the lot, a site-specific geotechnical investigation shall be prepared and shall be submitted to the City for review and approval.

10. All final working drawings shall be submitted to the Zoning Administrator for review and approval.

11. The development of the site shall be in substantial accordance with the approved plans submitted and on file in the Department of Planning and Community Development of the City of Santa Cruz.

12. The applicant and contractor who obtains a building permit for the project shall be required to sign the following statement at the bottom of these conditions, which will become conditions of the building permit:
“I understand that the subject permit involves construction of a building (project) with an approved Design Permit. I intend to perform or supervise the performance of the work allowed by this permit in a manner which results in a finished building with the same level of detail, articulation, and dimensionality shown in the plans submitted for building permits. I hereby acknowledge that failure to construct the building as represented in the building permit plans, may result in delay of the inspections process and/or the mandatory reconstruction or alteration of any portion of the building that is not in substantial conformance with the approved plans, prior to continuation of inspections or the building final.”
Signature of Building Contractor Date

13. All requirements of the Building Division, Green Building Division, Fire Department, Public Works Department (including Stormwater Division, and Bicycle Coordinator) and Water Department (including Water Conservation and Water Engineering) and the County Department of Environmental Health and Safety, shall be completed prior to occupancy and continuously maintained thereafter.

14. Grading shall be done during periods of dry weather and protective measures shall be incorporated during grading to prevent siltation from any grading project halted due to rain.

15. Adequate provisions shall be made to supply water to each of the premises covered by this application. The design of water facilities shall be to standards of the Water Department, and plans therefore must be submitted to the Water Department Director for review and approval prior to the issuance of a building permit.

22.21 RESOLUTION NO.
14 16. Plans submitted for building permit issuance shall show all exterior site lighting locations and fixture details. All exterior building lighting shall be shielded and contained in a downward direction. No exterior lighting shall produce off-site glare.

17. Exterior site lighting shall be provided along pedestrian pathways and in the vehicle parking area. Security lighting shall be motion sensor only.

18. Landscape plans shall be submitted at the time of the building permit application and will be reviewed by both the Planning Department and Water Department. The landscape plans shall demonstrate compliance with all requirements of the City’s Water-Efficient Landscaping Ordinance in Chapter 16.16 of the Santa Cruz Municipal Code prior to issuance of the building permit. New landscaping shall include foliage types, which may include tree(s), supportive of monarch butterfly populations, subject to review by biotic consulting firm Ecosystems West and approval by the Director of Planning and Community Development.

19. All landscaping shall be installed prior to final utility release or issuance of occupancy permits.

20. All Heritage-sized trees removed shall be replaced at a 2:1 ratio of at least two, 24-inch boxsized trees installed for each tree removed.

21. Bicycle parking shall be provided in accordance with Section 24.12.250-252 of the City's Zoning Ordinance.

22. All utilities and transformer boxes shall be placed underground in accordance with the provisions of Section 24.12.700 through 24.12.740 of the Zoning Ordinance.

23. A drainage plan shall be submitted in conjunction with application for building permits.

24. Any person exercising a development permit or building permit who, at any time in the preparation for or process of excavating or otherwise disturbing earth, discovers any human remains of any age or any artifact or any other object which reasonably appears to be evidence of an archaeological/cultural resource or paleontological resource, shall:
a. Immediately cease all further excavation, disturbance, and work on the project site; b. Cause staking to be placed completely around the area of discovery by visible stakes not more than ten feet apart forming a circle having a radius of not less than one hundred feet from the point of discovery; provided, that such staking need not take place on adjoining property unless the owner of the adjoining property authorizes such staking;
c. Notify the Santa Cruz County sheriff-coroner and the city of Santa Cruz planning director of the discovery unless no human remains have been discovered, in which case the property owner shall notify only the planning director; d. Grant permission to all duly authorized representatives of the sheriff-coroner and the planning director to enter onto the property and to take all actions consistent with this section.

22.22 RESOLUTION NO.
15 25. The plan for erosion control approved as part of this application shall be submitted and all work installed by November 1, or a later date as allowed by the Director of Public Works consistent with all applicable requirements of the Regional Water Quality Control Board.

26. Grading shall be done during periods of dry weather and protective measures shall be incorporated during grading to prevent siltation from any grading project halted due to rain.

27. Prior to site grading or any disturbance all trees and/or tree stands indicated for preservation or approved plans shall be protected through fencing or other approved barricade. Such fencing shall protect vegetation during construction and shall be installed to the satisfaction of the Director of Planning and Community Development.

28. If project site work occurs any time between February 1 and August 31, the applicant shall submit documentation of a pre-construction nesting bird survey by a qualified biologist prior to the start of work. The survey shall be described in the biotic report, if such a report was prepared, and shall be completed no more than seven days before the start of any project construction activities on the site (including tree removal, clearing, and excavation) and shall include observations of any nesting activities on the site. Site work may commence once the Planning Department has accepted the report and confirmed that there are no nesting birds on the site or that an appropriate buffer zone around any active nests has been recommended by the biologist, as applicable, and physically established on the site.

29. Handicap access shall be provided in accordance with California Building Code.

30. All new mechanical equipment and appurtenances, including gas and water meters, electrical boxes, roof vents, air conditioners, antennas, etc. visible from the public way and from adjacent properties, shall be screened with material compatible with the materials of the building and shall be subject to the approval of the Zoning Administrator.

31. All diesel-fueled off-road construction equipment greater than 75 horsepower shall be zeroemissions or equipped with California Air Resources Board (CARB) Tier 4 Final or Interim compliant engines. Alternatively, CARB Tier 2 or 3 compliant engines may be used if CARB Level 3 Verified Diesel Emissions Control Strategy (VDECS) filters are added to each piece of off-road diesel-fueled equipment.

32. Final colors and materials shall be approved by the Zoning Administrator prior to application for building permits. (Modified at PC 2-6-25)

33. Acoustic Analysis Basis of Design. Plans submitted for Building Permit shall conform to the Noise Evaluation (Basis of Design), prepared by Smith, Fause, and McDonald, Inc. (undated).

34. Acoustic Evaluation. Prior to issuance of Building Permit, an acoustic analysis (noise report) must be prepared, demonstrating consistency of the proposed project design with General

22.23 RESOLUTION NO.
16 Plan Policy HZ3.2.3, and compliance with recommendations of the acoustic evaluation to ensure ongoing conformance with that General Plan Policy must be maintained at all times.

35. Geotechnical Report. Prior to issuance of Building Permit, a letter and/or revisions to the Geotechnical and Groundwater Field Exploration and Evaluation report, prepared by Moore Twining Associates, Inc. dated February 14, 2024 must be provided for update of the report to correspond with the current project scope of work, including a new, four-story, approximately 120,604 square-foot multifamily educator workforce housing project encompassing approximately 100 residential units, approximately 119 parking spaces, new landscaping, and associated site modifications.

36. Transportation Analysis. Compliance with all recommendations of the Trip Generation Memorandum (including recommendations for the project site plan) dated October 25, 2024, prepared by Fehr and Peers Transportation Consultants, as may be amended, must be ensured at all times.

37. Bicycle Parking. Plans submitted for Building Permit shall show that the project will supply the requisite bicycle parking capacity, subject to review by City staff, and submittal of details of proposed bicycle parking facilities, including identification of vendor and specification of dimensions and arrangement of interior layout with spacing for all bike parking proposed, shall be made.

38. Compliance with Teacher Housing Act of 2016. Compliance with the Teacher Housing Act of 2016, as may be amended, shall be ensured throughout the life of the project. Such compliance shall include preparation and submittal by Santa Cruz City Schools, or authorized designee, reports to the City and/or other responsible agency/ies, required for ongoing compliance.

39. Affordable Housing Agreement. Applicant shall comply with the inclusionary housing requirements set forth at SCMC Chapter 24.16 and shall enter into and record an affordable housing development agreement prior to issuance of a building permit for any structure in the residential development. The affordable housing development agreement shall run with the land and bind all future owners and successors in interest. Submittal of reports demonstrating compliance with applicable State law shall additionally be made throughout the life of the project.

40. Compliance with Requirements of County Department of Environmental Health and Safety (ESH). Prior to issuance of Building Permit, compliance with all recommendations of the County of Santa Cruz Department of Environmental Health and Safety (ESH), or successor agency, shall be ensured.

41. Compliance with Recommendations of Arborist Report. Compliance with all recommendations of the arborist Report, prepared by Nigel Belton, dated May 24, 2023 as may be amended, must be ensured at all times.

42. Compliance with Recommendations of Environmental Site Assessments. Compliance with all recommendations of the Phase I Environmental Site Assessment (ESA), prepared by

22.24 RESOLUTION NO.
17 Moore Twining dated June 21, 2023, and compliance with all recommendations of the Phase II Environmental Site Assessment, prepared by Moore Twining and dated October 22, 2024, as either or both of the above-referenced ESAs may be amended, must be ensured at all times.

43. Santa Cruz Metropolitan Transit District. Prior to issuance of Building Permit, compliance with all requirements of the Santa Cruz Metropolitan Transit District shall be fulfilled, including coordination regarding retention or relocation of existing infrastructure, including, but not limited to, existing bus stop(s).

44. Bird-Safe Building Design Standards. The project shall comply with the City’s Bird-Safe Building Design Standards.

45. Compliance with Recommendations of Biotic Report/Memorandum. Compliance with all recommendations of the report/memorandum prepared by biotic consulting firm Ecosystems West as may be amended, must be ensured at all times.

46. Street Trees. City street trees, each of minimally 24-inch-box size, shall be planted in a quantity and at locations as determined by the City’s Urban Forester. City Street Trees to be planted must conform to the City’s approved Street Tree List.

47. Minimum Number of Street Trees. At least six (6) street trees shall be planted. (Added at PC 2-6-25)

48. Impact Fees. Prior to building permit issuance, the applicant shall pay all applicable impact fees, including, but not limited to, Traffic Impact Fees (TIF) as required by the Public Works Department; Park In-Lieu Fee/Parks Facility Tax; Public Safety Impact Fee; and Childcare Impact Fee.

49. Public Access Pathway. A public access pathway, minimally five feet in width at all points, shall be provided, allowing access at all times by pedestrians and bicyclists from Swift Street to Sergeant Derby Park.

50. Access to Pedestrian Pathway During Project Construction. Temporary access to Derby Park shall remain open during project construction. (Added at PC 2-6-25)

51. Laundry Microplastic Filters: All washing machines provided for common use among tenants shall be equipped with microplastic filters to reduce plastic pollution.  Building owners shall ensure that the microplastic filters on washing machines in common laundry rooms are regularly cleaned in accordance with the manufacturer’s specifications for the selected filter.  Filtered microplastics shall not be disposed of in drains.  Rather, they shall be disposed of in the solid waste trash containers, unless municipal facilities become equipped for and readily able to recycle said microplastic materials in the future, in which case the captured plastic shall be recycled through the municipal system. (Added at PC 2-6-25)

52. Bus Passes. The applicant shall enter into a contract with Santa Cruz Metropolitan Transit District (Santa Cruz METRO) to provide unlimited local transit passes for all residents of the subject development project, as required by SCMC 10.46.040. (Added at PC 2-6-25)

22.25 RESOLUTION NO.
18 53. Driveway Approach Design. Driveways and approaches shall comply with the standards set forth in Municipal Code Sections 15.20 and 24.12.280 and the driveway approach standard detail included with the public works standards in effect at the time of design review and shall be designed in accordance with American Association of State Highway and Transportation Officials (AASHTO) “Green Book” sight distance standards.

54. Lighting Plan. Prior to issuance of Building Permit, a lighting plan must be submitted demonstrating full compliance with all requirements of City of Santa Cruz Municipal Code Section 24.12.185, subject to review and approval by the Director of Planning and Community Development.

55. Stormwater Management: Prior to submittal of any application for Demolition Permit or Building Permit, the applicant shall submit all necessary information, documentation, and plans necessary to demonstrate compliance with all applicable requirements of the City, State Water Resources Control Board, and any other regulatory agencies related to satisfactory management and treatment of stormwater.

56. Reasonable Documentation: Should the applicant, property owner, or any interested party propose any incentive/concession requesting variation from any applicable development standard, such party shall submit pro formas or other reasonable documentation which demonstrates actual and identifiable cost reductions for the project associated with any such incentive/concession(s).

57. Subsequent Modification. Should any outstanding item of compliance, such as preparation and submittal of an acoustic report, provision of information related to stormwater management, updates to geotechnical report, or the like result in a substantial change to the project design as determined by the Director of Planning and Community Development, including, but not limited to, position of the building relative to the property lines of the site, such modification shall be considered by the Planning Commission at a public hearing, at the discretion of the Director of Planning and Community Development.

58. Mitigation Measure HAZ-1: Prepare and implement a soil removal action plan for additional investigation and/or removal of the elevated TPHd in near surface soil (upper 3 to 4 feet) in the vicinity of boring B10 (near the former concrete ramp used for vehicle/tank maintenance/repairs) and elevated arsenic in near surface soil (upper 3 to 4) in the vicinity of boring B4.

59. Mitigation Measure HAZ-2: Conduct additional soil gas sampling to confirm if the detected concentrations of benzene and chloroform are present in soil gas at the site that may cause an excessive vapor intrusion risk to the proposed school development (benzene and chloroform concentrations were detected slightly above published residential screening level values which are used for proposed school sites). In lieu of additional soil gas sampling, a chemical resistant vapor barrier can be installed below the proposed onsite buildings during future development to mitigate the potential vapor intrusion concern.

22.26 RESOLUTION NO.
19 60. Mitigation Measure HAZ-3: Prepare and implement a soil and groundwater management plan to address handling and management of impacted soil and/or groundwater that could be potentially encountered during construction activities. The detected concentrations of TPHd, TPHmo, TCE, arsenic, and chromium in soil and/or groundwater may require special handling/testing and increase construction cost if soil/groundwater is required to be exported/disposed of offsite.

61. Construction activity resulting in a land disturbance of one acre or more, or less than one acre but part of a larger common plan of development or sale must obtain the Construction Activities Storm Water General Permit (2022-0057-DWQ Permit). Construction activity includes clearing, grading, excavation, stockpiling, and reconstruction of existing facilities involving removal and replacement. Construction activity does not include routine maintenance such as maintenance of original line and grade, hydraulic capacity, or original purpose of the facility.

62. Prior to the issuance of a building permit, the applicant shall pay all required impact fees pursuant to relevant provisions of the City of Santa Cruz Municipal Code based on the final building permit plans.

63. Asbestos/Lead-Based Paint: Prior to demolition, testing shall be performed for presence of asbestos and lead based paint by EPA or CA state certified health inspectors. An application shall be submitted, and approval shall then be obtained from Monterey Bay Air Resources District (MBARD) for the hazardous or other regulated material removal. An ASB application number through MBARD or release in the form of an email from MBARD shall be provided to the City of Santa Cruz Building and Safety Division prior to plan approval and permit issuance.

64. Construction Waste Management Plan: Prior to demolition permit issuance, a fully completed Construction Waste Management Plan for 65% minimum diversion rate must be submitted and shall include diversion rates and methods for individual waste streams. The document is available at http://www.cityofsantacruz.com/home/showdocument?id=58142.

65. Stormwater Management. Prior to issuance of Building Permit, a Storm Water Pollution Prevention Plan (SWPPP) must be submitted. Each residential unit will require compliance with Santa Cruz Green Building Program for Residential New Construction and Residential Mandatory Measures Chapter 4 of 2019 CALGreen using a Residential Green Building Checklist. Note: The city green building program points required scale with unit floor area.

For the purposes of determining EV Charging Space compliance, the plans must clearly allocate parking spaces between residential and commercial use.

66. Outdoor Lighting: Outdoor lighting must demonstrate compliance with BUG rating limits in 2019 CALGreen 5.106.8 for Lighting Zone 3 for this development in the Outdoor Lighting Schedule in the building permit submission. All outdoor lighting shall be downward facing and shielded to minimize off-site glare.

22.27 RESOLUTION NO.
20 67. Bicycle Parking: Prior to issuance of Building Permit, details of proposed bicycle parking facilities, including identification of vendor and specification of dimensions and arrangement of interior layout with spacing for all bike parking proposed, must be submitted for review and approval by the Director of Public Works or authorized designee.

68. Utility Locations – Illustration of locations of all existing and proposed underground utilities and points of connection for sewer lateral, gas, and water lines on the plans.

69. Utility Undergrounding - When providing new electrical service to a parcel, it shall be undergrounded. Indicate the location and the point of connection to the nearest Pacific Gas & Electric (PG&E) facility for the underground power to the property.

70. Operations and Maintenance Plan (O&M Plan): A final O&M Plan shall be submitted as part of the Building Permit application. The O&M Plan shall include at a minimum: 1) site plan showing the location of drainage structures and structural control measures; 2) O&M procedures, timing, and maintenance frequency for the LID features and drainage systems, and include applicable BMPs from Chapter 6B of the City's Storm Water BMPs for Development Projects; 3) cost estimates for maintenance; and 4) BMPs for any Special Site Conditions (see pages 30-31), e.g. trash enclosure, parking, etc.

71. The O&M Plan shall be submitted in an 8 ½ x 11 inch report format and can be included as a SWCP appendix. The signed Maintenance Agreement shall be included in the O&M Plan as an attachment.

72. Construction Dewatering Operations: Plans submitted must indicate whether dewatering or groundwater discharges are expected either during construction or post-construction/longterm for any of the below ground project components. If so, please inform the project planner and submit plans indicating whether there are any current or past site contamination issues.

73. State Construction General Permit: A Notice of Intent (NOI) must be filed with the State Water Resource Control Board (SWRCB) to obtain coverage under the NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Construction General Permit) prior to commencing work. The applicant is responsible for filing a Notice of Intent and for developing a Storm Water Pollution Prevention Plan (SWPPP). Prior to issuance of a demolition, grading, or building permit, the applicant shall provide the City with proof of coverage under the State Construction General Permit, including a copy of the letter of receipt and Waste Discharger Identification (WDID) number issued by the SWRCB that acknowledges the property owner’s submittal of a complete Notice of Intent (NOI) package. Please submit an electronic copy of the site’s Storm Water Pollution Prevention Plan (SWPPP) submitted to the State. For information on the Construction General Permit, please see the State Water Board website:
http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.shtml

22.28 THIS IS A MULTLI-FAMILY HOUSING PROJECT FOR EDUCATORS EMPLOYED BY SANTA CRUZ CITY SCHOOLS ("SCCS") SCHOOL DISTRICT LOCATED AT 313 SWIFT STREET. THE PROJECT INCLUDES 100 RESIDENTIAL APARTMENT UNITS AND ASSOCIATED SITEWORK. THE DWELLING UNITS WILL BE A MIX OF STUDIO, ONEBEDROOM, TWO-BEDROOM, AND THREE-BEDROOM APARTMENT STYLE UNITS WITH AMENITIES TYPICAL TO SIMILAR BUILDINGS. OFF-STREET SURFACE VEHICLE PARKING WILL BE ACCOMODATED WITH SURFACE LOTS ALONG THE NORTH END OF THE SITE.

THE PROJECT WILL BE A 4-STORY STRUCTURE TOTALLING 120,604 GSF; THE PROJECT PROPERTY ENCOMPASSES 177,584 SF (4.08 ACRES) OF TOTAL SITE AREA, AND INCLUDES (2) EXISTING BUILDINGS TO REMAIN ALONG SWIFT STREET.

PROJECT DESCRIPTION
PROJECT LOCATION:
313 SWIFT STREET
SANTA CRUZ, CA 95060
APN: 003-16-132
APPLICABLE CODES (BASIS OF DESIGN):

CODE REQUIREMENTS INCLUDE BUT ARE NOT LIMITED TO THE FOLLOWING:

APPLICABLE STATE CODES:
2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, CBSC 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, CBSC
2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, CBSC
2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, CBSC
2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, CBSC
2022 CALIFORNIA ENERGY CODE (CPC), PART 6, CBSC
2022 CALIFORNIA FIRE CODE, PART 9, CBSC
2022 CALIFORNIA REFERENCED STANDARDS, PART 12, CBSC
TITLE 8 C.C.R., CH. 4, SUB-CH. 6-ELEVATOR SAFETY ORDERS TITLE 19 C.C.R., PUBLIC SAFETY, SFM REGULATIONS
APPLICABLE FEDERAL CODES & STANDARDS:
2022 ADA STANDARDS FOR ACCESSIBLE DESIGN
APPLICABLE LOCAL CODES:

SANTA CRUZ MUNICIPAL CODE (SCMC)
OCCUPANCY CLASSIFICATION & TYPE OF CONSTRUCTION:

OCCUPANCY TYPE R-2, CONSTRUCTION TYPE V-A
UNIT MIX:

STUDIOS: 11 UNITS
1 BEDROOM: 28 UNITS
2 BEDROOMS: 50 UNITS
3 BEDROOMS: 11 UNITS
TOTAL: 100 UNITS
UNIT & AREA TOTAL: GROSS AREA STUDIOS 1 BR 2 BR 3 BR TOTAL LEVEL 1: 28,276 GSF 2 7 11 2 22
LEVEL 2: 30,776 GSF 3 7 13 3 26
LEVEL 3: 30,776 GSF 3 7 13 3 26
LEVEL 4: 30,776 GSF 3 7 13 3 26
TOTAL (NEW) 120,604 GSF 11 28 50 11 100
EXISTING BLDG 1 2,077 GSF
EXISTING BDLG 2 3,308 GSF
TOTAL (ALL BDLGS) 125,989 GSF

PROJECT DATA

EXISTING AND PROPOSED USES
EXISTING USES:
• (1) ONE STORY, 2,077 S.F. ADMINISTRATIVE BUILDING USED BY THE SANTA CRUZ

EDUCATION FOUNDATION, WHICH WILL MOVE OUT PRIOR TO THE START OF CONSTRUCTION. BUILDING IS TO REMAIN, BUT THE USE IS PROPOSED TO BE

CHANGED TO BE PROPERTY MANAGEMENT OFFICES AND SUPPORT SPACES FOR THE PROPOSED RESIDENTIAL DEVELOPMENT.
• (1) ONE STORY, 3,308 S.F. EDUCATIONAL BUILDING USED THE WESTSIDE PARENT EDUCATION NURSERY SCHOOL, WHICH WILL MOVE OUT BY JANUARY 1, 2025. THE

BUILDING IS TO REMAIN, BUT THE USE IS PROPOSED TO BE CHANGED TO STORAGE EXCLUSIVELY FOR RESIDENTS OF THE PROPOSED RESIDENTIAL DEVELOPMENT. • (2) ONE STORY MOBILE, PORTABLE CLASSROOM BUILDINGS USED BY THE SANTA

CRUZ OFFICE OF EDUCATION TRANSITION PROGRAM, WHICH WILL MOVE OUT BY JUNE, 2025. THESE BUILDINGS WILL BE REMOVED FROM THE PROPERTY.

PROPOSED USES
• NEW 4 STORY, 100 DWELLING UNIT, 120,604 S.F. MULTI FAMILY HOUSING PROJECT • THE ONE STORY, 2,077 S.F. ADMINISTRATIVE BUILDING BUILDING IS TO REMAIN, BUT

THE USE IS PROPOSED TO BE CHANGED TO BE PROPERTY MANAGEMENT OFFICES AND SUPPORT SPACES FOR THE PROPOSED RESIDENTIAL DEVELOPMENT. • THE ONE STORY, 3,308 S.F. EDUCATIONAL BUILDING IS TO REMAIN, BUT THE USE IS

PROPOSED TO BE CHANGED TO STORAGE EXCLUSIVELY FOR RESIDENTS OF THE PROPOSED RESIDENTIAL DEVELOPMENT.

DESIGN/BUILD CONTRACTOR
BOGARD CONSTRUCTION INC.
350 CORAL ST #A
SANTA CRUZ, CA 95060
T: (831) 426-8191

ARCHITECT OF RECORD

EHDD ARCHITECTURE
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
T: (415) 285-9193

ASSOCIATE ARCHITECT

STUDIO VARA
3130 20TH ST, SUITE 190
SAN FRANCISCO, CA 94110
T: (415) 826-1367

CIVIL ENGINEER

IFLAND ENGINEERS
1509 SEABRIGHT AVE, SUITE A2
SANTA CRUZ, CA 95062
T: (831) 426-5313

LANDSCAPE ARCHITECT
JONI L. JANECKI & ASSOCIATES, INC.
515 SWIFT ST
SANTA CRUZ, CA 95060
T: (831) 423-6040

STRUCTURAL ENGINEER
FTF ENGINEERING, INC.
38 MASON ST, 2ND FLOOR
SAN FRANCISCO, CA 94102
T: (415) 931-8460

PROJECT TEAM

MECH/ELEC/PLUMBING ENGINEER

POINT ENERGY INNOVATIONS
220 MONTGOMERY ST, SUITE 321
SAN FRANCISCO, CA 94104
T: (415) 663-6340

ACOUSTICAL ENGINEER
SMITH, FAUSE & MCDONALD, INC.
351 8TH STREET
SAN FRANCISCO, CA 94103
T: (415) 255-9140
TBD
DEFERRED SUBMITTALS FOR DESIGN BUILD PERMITS SHALL BE SUBMITTED BY OTHERS.

THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR HIRING LICENSED

PROFESSIONALS AS REQUIRED TO DESIGN AND BUILD THE SYSTEM AS WELL AS

PROVIDE SERVICES TO INCLUDE THE PREPARATION OF DRAWINGS AS REQUIRED FOR PERMIT. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED.

DEFERRED APPROVAL

THIS SET OF DRAWINGS DOES NOT ADVERSELY INFRINGE ON THE BASIC LIFE SAFETY SYSTEMS OR THE BUILDING.

NON-INFRINGEMENT

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:29 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 12" = 1'-0"
G0.00

COVER SHEET

SCCS EDUCATOR

HOUSING
Author
23132

VICINITY MAP

SCCS EDUCATOR HOUSING
313 SWIFT STREET
FORMAL APP BACKCHECK 08.30.2024
FORMAL APP BACKCHECK 2 11.01.2024

22.29 PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:30 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt G0.01

SHEET INDEX

SCCS EDUCATOR

HOUSING
Author
23132

GENERAL
G0.00 COVER SHEET
G0.01 SHEET INDEX
G0.02 ARCHITECTURAL ABBREVIATIONS AND SYMBOLS
G0.11 PROJECT RENDERINGS
G0.12 PROJECT RENDERINGS
G0.13 PROJECT STREET VIEWS
G0.14 NEIGHBORHOOD CONTEXT IMAGES
G0.15 PLANNING & ZONING SUMMARY
G0.16 SHADOW STUDIES
G0.21 CODE ANALYSIS
G0.22 LIFE SAFETY & ACCESSIBILITY SITE PLAN
G0.23 LIFE SAFETY PLANS
G0.31 ACCESSIBLE MOUNTING HEIGHTS
G0.32 MOBILITY UNIT DISPERSION PLANS
G0.41 PLUMBING CALCULATIONS
G1.01 SURVEY - FOR REFERENCE ONLY
G1.02 SURVEY - FOR REFERENCE ONLY
G1.03 SURVEY - FOR REFERENCE ONLY
18 CIVIL
C0.0 SCHEMATIC DEMOLITION PLAN
C1.0 SCHEMATIC GRADING AND DRAINAGE PLAN
C2.0 SCHEMATIC UTILITY PLAN
C3.0 SCHEMATIC STORMWATER CONTROL PLAN
C3.1 SCHEMATIC STORMWATER CONTROL CALCULATIONS 5

LANDSCAPE
TPZ1.00 TREE REMOVAL & PROTECTION PLAN
L1.00 LANDSCAPE SITE PLAN
L1.01 LANDSCAPE NOTES, PLANT LIST & PLAN IMAGES 3

ARCHITECTURAL
A0.12 SITE PLAN
A0.13 SITE SECTIONS
A0.14 (E) BUILDING FLOOR PLAN (FOR REFERENCE)
A0.15 (E) BUILDING FLOOR PLAN - PROPOSED USE
A0.21 AXONOMETRIC VIEWS
A2.01 FLOOR PLAN - LEVEL 1
A2.02 FLOOR PLAN - LEVEL 2
A2.03 FLOOR PLAN - LEVEL 3
A2.04 FLOOR PLAN - LEVEL 4
A2.05 ROOF PLAN
A2.11A SECTOR FLOOR PLAN - LEVEL 1 WEST
A2.11B SECTOR FLOOR PLAN - LEVEL 1 EAST
A2.12A SECTOR FLOOR PLAN - LEVEL 2 WEST
A2.12B SECTOR FLOOR PLAN - LEVEL 2 EAST
A2.13A SECTOR FLOOR PLAN - LEVEL 3 WEST
A2.13B SECTOR FLOOR PLAN - LEVEL 3 EAST
A2.14A SECTOR FLOOR PLAN - LEVEL 4 WEST
A2.14B SECTOR FLOOR PLAN - LEVEL 4 EAST
A2.15A ROOF PLAN -WEST
A2.15B ROOF PLAN - EAST
A3.01 BUILDING ELEVATIONS - EAST WING
A3.02 BUILDING ELEVATIONS - EAST WING
A3.03 BUILDING ELEVATIONS - WEST WING
A3.04 BUILDING ELEVATIONS
A3.11 ENLARGED BUILDING ELEVATIONS
A3.12 ENLARGED BUILDING ELEVATIONS
A3.21 BUILDING SECTION
A4.01 ENLARGED FLOOR PLANS, RCP - STUDIO, 1BR
A4.02 ENLARGED FLOOR PLANS, RCP - 1BR
A4.03 ENLARGED FLOOR PLANS, RCP - 2BR
A4.04 ENLARGED FLOOR PLANS, RCP - 3BR
A4.05 ENLARGED FLOOR PLANS, RCP - MOBILITY UNITS
A4.06 ENLARGED FLOOR PLANS, RCP - MOBILITY UNITS
A4.07 ENLARGED FLOOR PLANS COMMON AREAS
A8.11 EXTERIOR WALL DETAILS
A8.51 ROOF DETAILS - MEMBRANE ROOFING
A8.52 ROOF DETAILS - MEMBRANE ROOFING
A9.01 PARTITION TYPES
A9.02 FLOOR & CEILING TYPES
39 STRUCTURAL
S0.00 LEGENDS
S0.01 GENERAL NOTES I
S2.11A FIRST FLOOR / FOUNDATION PLAN - WEST
S2.11B FIRST FLOOR / FOUNDATION PLAN - EAST
S2.11C BRIDGE
S2.12A SECOND FLOOR FRAMING PLAN - WEST
S2.12B SECOND FLOOR FRAMING PLAN - EAST
S2.13A THIRD FLOOR FRAMING PLAN - WEST
S2.13B THIRD FLOOR FRAMING PLAN - EAST
S2.14A FOURTH FLOOR FRAMING PLAN - WEST
S2.14B FOURTH FLOOR FRAMING PLAN - EAST
S2.15A ROOF FRAMING PLAN - WEST
S2.15B ROOF FRAMING PLAN - EAST
S6.00 WOOD FRAMING DETAILS
S6.10 WOOD SHEAR WALL DETAILS
15 TOTAL SHEETS: 80

SHEET INDEX
FORMAL APP BACKCHECK 2 11.01.2024

22.30 1. THE FOLLOWING GENERAL NOTES APPLY TO ALL A-SERIES DRAWINGS.

2. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

3. FOR NON A-SERIES GENERAL NOTES AND SYMBOLS REFER TO APPLICABLE DRAWINGS.

4. THE A-SERIES DRAWINGS ARE A PART OF A LARGER SET OF DRAWINGS. REVIEW AND COORDINATE THE WORK ALL ASPECTS OF THE CONTRACT DOCUMENTS.

ARCHITECTURAL GENERAL NOTES
SECOND
LEVEL +10'-0"

BUILDING SECTION

BLDG SECTION NUMBER

DIRECTION OF VIEW

SHEET WHERE DRAWN

WALL SECTION

NORTH ARROW REFERENCE

PROJECT
NORTH

NEW GRID

IDENTIFICATION

EXISTING GRID

IDENTIFICATION

LAYOUT GRID LINES

BASIC DRAWING TITLE

LEVEL LINE

REVISION NUMBER AND EXTENT

ROOM NAME AND NUMBER

PLAN DETAIL REFERENCE

EXTERIOR ELEVATION

SEE PARTITION SYMBOL

DESCRIPTION ON SHEET
A9.X.X

PARTITION TYPE IDENTIFICATION MARK

ELEVATION NUMBER

AND DIRECTION

SHEET WHERE DRAWN

SHEET WHERE DRAWN,

HYPHEN INDICATES
DETAIL ON SAME SHEET.

DETAIL NUMBER
AX.X.X X

WINDOW AND LOUVER TYPE MARK

WINDOW MARK

NAME OF LEVEL

INDICATES HEIGHT

ABOVE PROJECT DATUM

REVISION NUMBER -

SEE REVISION HISTORY

ON THE TITLE BLOCK

OF EACH SHEET

EXTENT OF CURRENT

REVISION

KEYED NOTE MARK

MATCH LINE REFERENCE

DRAWING TITLE SYMBOLS
1 SEE CORRESPONDING

NUMBERED KEY NOTE

ON SHEET WHERE

REFERENCE OCCURS

DRAWING SIDE

DRAWING WHERE

CONTINUATION IS
FOUND
SCALE: 1/8" = 1'-0"
AX.XX
X SIM
1 A101
Room Name
101
W-X
A3E3

WALL SECTION NUMBER

DIRECTION OF VIEW

SHEET WHERE DRAWN

SECTION DETAIL REFERENCE

ELEVATION NUMBER

SHEET WHERE DRAWN

DETAIL REFERENCE

SHEET WHERE DRAWN,

HYPHEN INDICATES
DETAIL ON SAME SHEET.

AX.XX DETAIL NUMBER
X SIM
SIM
AX.XX
X

INTERIOR ELEVATION REFERENCE

ELEVATION NUMBER AND

DIRECTION OF VIEW

SHEET WHERE DRAWN
AX.XX X
AX.XX
X SIM
AX.XX
X SIM

DOOR IDENTIFICATION MARK
A3E3 DOOR OPENING MARK

ARCHITECTURAL REFERENCE SYMBOLS
View Name

1. VERIFY ALL DIMENSIONS BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCY OR VARIATION. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATION OR DISCREPANCY IS RESOLVED.

2. DO NOT SCALE DRAWINGS. IF UNABLE TO LOCATE DIMENSIONS FOR ANY ITEM OF WORK, CONSULT ARCHITECT FOR DIRECTION BEFORE PROCEEDING.

3. PLAN DIMENSIONING: DIMENSIONS ARE TO:

FACE OF INTERIOR GYPSUM BOARD
FACE OF EXT. FINISH

CENTER LINE OF COLUMN GRID

FACE OF DOOR JAMBS

4. HEIGHTS SHOWN OR NOTED AFF (ABOVE FINISH FLOOR) ARE TO BE MEASURED FROM TOP OF FINISH FLOOR MATERIAL. EXCEPTIONS: AT AREAS THAT RECEIVE CARPET OR RESILIENT FLOORING, HEIGHTS ARE MEASURED FROM TOP OF CONCRETE.

5. IF DRAWING IS LESS THAN 30" X 42", IT HAS BEEN REDUCED FROM ORIGINAL.

6. DETAILS SHOWN ON DRAWINGS SHALL BE INCORPORATED INTO THE PROJECT AT ALL

APPROPRIATED LOCATIONS WHETHER SPECIFICALLY REFERENCED AT EACH LOCATION OR NOT.

7. INSTALL NECESSARY BLOCKING, BACKING, FRAMING, HANGERS, AND OTHER SUPPORT FOR FIXTURES, EQUIPMENT, SHELVING AND CASEWORK.

8. PROVIDE GYPSUM WALL BOARD OR PLASTER BEHIND AND AROUND ALL OPENINGS

INCLUDING WALL CABINETS, RECESSED FIRE HOSE VALVE AND FIRE EXTINGUISHER

CABINETS, ELECTRICAL PANELS AND ELECTRICAL BOXES WHERE REQUIRED BY CODE TO MAINTAIN FIRE RATED CONSTRUCTION SHOWN ON DRAWINGS.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL SUPERVISE ALL CUTTING

AND PATCHING OF FINISHED WORK ALREADY INSTALLED IF MADE NECESSARY BY ERRORS, CHANGES, OR OTHER REASONS. ALL REPLACEMENT WORK SHALL MATCH ADJOINING SURFACES WITH NO VISIBLE MARKINGS OF REDO/REPAIR WORK.

10. FOR EQUIPMENT WEIGHING MORE THAN 400 LBS AND SUPPORTED DIRECTLY ON THE

FLOOR OR ROOF STRUCTURE AND FOR TEMPORARY OR MOVABLE EQUIPMENT AND FOR EQUIPMENT WEIGHING MORE THAN 20 LBS THAT IS SUPPORTED BY VIBRATION DEVICES

SUSPENDED FROM THE ROOF, WALL OR FLOOR ANCHORAGE MUST BE ENGINEERED BY

A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA TO MEET CCR TITLE 24 PART 2. COORDINATE WITH STRUCTURAl DWGS

11. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL SUPPORTS,

ANCHORS, CLIPS, FASTENERS, BRACES, AND REINFORCEMENTS FOR ALL ASSEMBLIES,

SYSTEMS, FIXED EQUIPMENT, ACCESSORIES, AND SO FORTH, THAT ARE A PART OF THE

STRUCTURAL SYSTEM, HAVE BEEN SHOWN, SPECIFIED, OR SIZED OR ARE REASONABLY

REQUIRED TO COMPLETE THE WORK IN CONFORMANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL ALSO PROVIDE CALCULATIONS FOR ALL SUCH ITEMS AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION.

12. IF A DISCREPANCY EXISTS BETWEEN DRAWINGS, BETWEEN DRAWINGS AND

SPECIFICATIONS OR WITHIN THE SPECIFICATIONS, SUCH DISCREPANCY SHALL BE

BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO INSTALLATION OF SAID WORK. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATION OR DISCREPANCY IS RESOLVED.

13. THE CONTRACTOR SHALL NOT FABRICATE OR INSTALL ANY WORK WHERE THEY HAVE

REASONABLE KNOWLEDGE THAT THE CONTRACT DOCUMENTS MAY BE IN CONFLICT

WITH APPLICABLE CODES OR INTERPRETATION OF THE AUTHORITY HAVING JURISDICTION. ANY SUCH INFORMATION SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ARCHITECT WHO SHALL ISSUE A RESOLUTION OF THE CONFLICT.

14. SHOULD ANY CONDITIONS DEVELOP NOT COVERED BY THE CONTRACT DOCUMENTS SUCH THAT THE FINISHED WORK WILL NOT COMPLY WITH TITLE 24 OF THE CALIFORNIA

CODE OF REGULATIONS, A CHANGE ORDER DETAILING AND SPECIFYING THE REQUIRED

WORK SHALL BE SUBMITTED TO AND APPROVED BY THE OWNER BEFORE PROCEEDING WITH THE WORK.

PROJECT GENERAL NOTES
&..............................................................And °..........................................Angle in Degrees ∠….......................................................Angle @................................................................At X.................................................................By C.....................................................Centerline ø.......................................Diameter or Round (E)......................................................Existing (N)...........................................................New P............................................................Plate %.......................................................Percent #.........................................Pound or Number ⅊................................................Property Line ²...........................................................Square A.C........................................Air Conditioning A/V..............................................Audio Visual AB................................................Anchor Bolt ABRSV..............................................Abrasive ABV......................................................Above ACC..............................................Accessible ACOUS.......................................Acoustic (al) ACP.....................Acoustical Concrete Paving
ACU...............................Air Conditioning Unit AWT......................Acoustical Wall Treatment
AD..............................................Access Door AD.................................................Area Drain ADC............................Automatic Door Closer
ADDL..............................................Additional ADH.................................................Adhesive ADJ...............................................Adjustable ADJC................................................Adjacent AFF...................................Above Finish Floor AFG.............................Above Finished Grade
AFS................................Above Finished Slab
AGGR.............................................Aggregate AHR.....................................................Anchor AHU.....................................Air Handling Unit AL...................................................Aluminum ALM.......................................................Alarm ALT...................................................Alternate AMT....................................................Amount ANN..............................................Annunciator ANOD...............................................Anodized ANT....................................................Antenna AP..............................................Access Panel APPROX................................Approximate (ly)
ARCH.......................................Architect (ural) ASPH..................................................Asphalt ASSN............................................Association ASSY...............................................Assembly AC.........................................Acoustic Ceiling

ATCH............................................Attachment AWG...............................American Wire Gage
B.O.F.................................Bottom of Footing B.U....................................................Built Up B.U.R........................................Built Up Roof BB...........................................Bulletin Board BC................................................Bridge Clip BD........................................................Board BETW...............................................Between BEV.......................................................Bevel BITUM...........................................Bituminous BLDG.................................................Building BLKG................................................Blocking BLW......................................................Below BM.........................................................Beam BM...............................................Bench Mark BOT.....................................................Bottom BP.................................................Base Plate BRDG................................................Bridging BRG...................................................Bearing BRKT..................................................Bracket BRS.......................................................Brass BRZ.....................................................Bronze BS.................................................Both Sides BSMT.............................................Basement C..............................................................Civil CAB...................................................Cabinet CPT.....................................................Carpet CAV......................................................Cavity C.B.............................................Catch Basin CEM...................................................Cement CER...................................................Ceramic CFM............................Cubic Foot per Minute
CFLG...................................Counter Flashing C & G.................................Curb and Gutter
C.G...........................................Corner Guard C.H...........................................Ceiling Height CHAN................................................Channel CHFR................................................Chamfer CHK BD.....................................Chalk Board
CIP..........................................Cast-in-Place CJ......................................Construction Joint CL................................................Center Line CLG.....................................................Ceiling CLJ............................................Control Joint CLO......................................................Closet CLR........................................................Clear CMPST...........................................Composite CMU...........................Concrete Masonry Unit
CNR.....................................................Corner CNTR.................................................Counter CO.........................................Cased Opening C.O.................................................Clean Out COL....................................................Column COMB.........................................Combination COMP..............................................Compact COMPL........................................Compliance COMPT.....................................Compartment
CONC...............................................Concrete CONF...........................................Conference CONN...........................................Connection CONSTR.....................................Construction CONT.................................Continuous (ation) CONTR.......................................Contract (or) COORD..........................................Coordinate CORR................................................Corridor COV PL........................................Cover Plate C.P...........................................Control Panel CPT.....................................................Carpet CRC...............................Cold Rolled Channel
CRL......................................................Carrel CS................................................Cast Stone C.S.B.........................Concrete Splash Block
CSMT.............................................Casement CSWK.............................................Casework CT...............................................Ceramic Tile CTD & R..........................Combination Towel
..................Dispenser & Receptacle
CTR......................................................Center CTSK..........................................Countersunk CU.........................................................Cubic CUB....................................................Cubicle CYL L........................................Cylinder Lock (D)....................................................Demolish D...........................................................Depth D.A...........................................Drainage Area D.CL............................................Door Closer D.F...............................................Douglas Fir D.H.............................................Double Hung DBL......................................................Double DIA...................................................Diameter DEG.....................................................Degree DEMO.............................................Demolition DEPT............................................Department DET.......................................................Detail DF.......................................Drinking Fountain DFR..............................................Door Frame DIF..................................................Difference DIFF....................................................Diffuser DIM.................................................Dimension DISP................................................Dispenser DIST..................................................Distance DIV.......................................................Divider DLV..............................................Door Louver DMPF........................................Dampproofing DMPR.................................................Damper DN..........................................................Down DOP..........................................Door Opening DR..........................................................Door DS.................................................Downspout DSP..........................................Dry Standpipe DST.................................................Door Stop DT....................................................Drain Tile DUPL................................................Duplicate DWG..................................................Drawing DWR...................................................Drawer (E)......................................................Existing E..............................................................East E.......................................................Electrical EA...........................................................Each EDF........................Electric Drinking Fountain
EF................................................Electric Fan EJ..........................................Expansion Joint EL.....................................................Elevation ELAST.........................................Elastometric ELEC................................................Electrical ELEV..................................................Elevator EMER............................................Emergency EMP........................Electrical Metallic Tubing
ENAM..................................................Enamel ENCL...............................................Enclosure ENGR...............................................Engineer EO..........................................Electrical Outlet E.O.S..........................................Edge of Slab EP..........................................Electrical Panel EQ.........................................................Equal EQPT.............................................Equipment EQUIV............................................Equivalent ERECT...............................................Erection ESMT..............................................Easement EST...................................................Estimate ETR...................................Existing to Remain EWC..............................Electric Water Cooler
EXC...................................................Excavate EXIST..................................................Existing EXP BT...................................Expansion Bolt EXP................................Expanded/Expansion
EXP JT...................................Expansion Joint EXT.....................................................Exterior EXTN...............................................Extension EXTR................................Extrusion, Extruded F/...........................................................From F&F........................Furniture and Furnishings
FA...................................................Fire Alarm FBD................................................Fiberboard FD.................................................Floor Drain FDMPR........................................Fire Damper FDN...............................................Foundation FEC........................Fire Extinguisher Cabinet
FEXT....................................Fire Extinguisher FF.................................................Finish Floor FGL.................................................Fiberglass FH...................................................Fire Hose FHC...................................Fire Hose Cabinet FHCS.......................Flat Head Counter Sunk
F.H.V.E.C.......................Fire Hose Valve and
......................................Extinguisher Cabinet F.H.W.S......................Flat Head Wood Screw
FIN.........................................................Finish FIN.FL...........................................Finish Floor FIN GR........................................Finish Grade FIXT......................................................Fixture FL............................................................Floor FLDG...................................................Folding FLR................................................Floor (ing) FLUOR.........................................Fluorescent FOC....................................Face of Concrete FOF..........................................Face of Finish FOM.....................................Face of Masonry FOS..........................................Face of Studs FOSTL.......................................Face of Steel FPRF...........................................Fireproofing FR.................................................Fire Rating FRP............................Fiber Reinforced Panel
F.R.P.T........Fire Retardant Pressure Treated
F.R.T...........................Fire Retardant Treated
FS.....................................................Far Side F.S....................................................Full Size FSH..................................Fire Sprinkler Head FSP..........................................Fire Standpipe FSTNR..............................................Fastener F.T...............................................Fire Treated FT...............................................Foot or Feet FTG.....................................................Footing FURN................................................Furniture FURR...................................................Furring FUT.......................................................Future F.V.C......................Fire Hose Valve Cabinet
FXTR....................................................Fixture GA...........................................Gage or Gauge GAL.......................................................Gallon GALV.............................................Galvanized GB...................................................Grab Bar GDR...............................................Guard Rail GEN................................................Generator GENL..................................................General G.F.R.C…..Glass Fiber Reinforced Concrete
GL..........................................................Glass GMKD.............................Grand Master Keyed
GND.....................................................Ground GOVT...........................................Government GP..........................................Gypsum Plaster GR............................................Grade (e)(ing) GR.LN............................................Grade Line GRL.........................................................Grille GRP.......................................................Group GSKT...................................................Gasket GRTG...................................................Grating GSM..........................Galvanized Sheet Metal
GT...........................................................Grout GUT.......................................................Gutter GV................................................Gravity Vent GWB.................................Gypsum Wall Board
GYP BD...................................Gypsum Board
GYP....................................................Gypsum GYP PLAS..............................Gypsum Plaster
H PLAM....................High Pressure Laminate
HB...................................................Hose Bib HCMU.............Hollow Concrete Masonry Unit
HD..........................................................Hand H.D...............................................Hand Dryer HDR.....................................................Header HDWD.............................................Hardwood HDWE..............................................Hardware HGR.....................................................Hanger HM..............................................Hollow Metal H.M.D.................................Hollow Metal Door H.M.F...............................Hollow Metal Frame
HNDRL............................................Hand Rail HO.................................................Hold-Open HORIZ.............................................Horizontal HR...........................................................Hour H.S.B................................High Strength Bolt HT.........................................................Height HTG....................................................Heating HTR......................................................Heater HV.................................................Hose Valve HVAC…………..…….Heating, Ventilation and
………………………………...Air Conditioning
HYDR...............................................Hydraulic ID...........................................Inside Diameter IN................................................Inch, Inches INC............................................Inside Corner INCAND.....................................Incandescent INDL.................................................Industrial INFO..............................................Information INL...........................................................Inlet INSTL.............................................Installation INSUL...............................................Insulation INSUL PNL.............................Insulated Panel
INT.......................................................Interior INV.........................................................Invert JAN.......................................................Janitor J.B.............................................Junction Box JST..........................................................Joist JT............................................................Joint KD...................................................Kiln Dried KO...................................................Knockout K.O.P......................................Knockout Panel KPL.................................................Kick Plate L...........................................................Length LAB................................................Laboratory LAM...............................................Lamination LATL....................................................Lateral LAV...................................................Lavatory LB.......................................................Pound LBR.....................................................Lumber LD............................................Linear Diffuser LDG....................................................Landing LDR......................................................Leader LF.................................................Linear Foot LG........................................................Length LH...................................................Left Hand LIB.......................................................Library LIN.........................................................Linear LIQ.........................................................Liquid LKR.......................................................Locker LL....................................................Live Load LOC...................................................Location LONG...........................................Longitudinal LT............................................................Light LT. WT.........................................Light Weight LTG.....................................................Lighting LTG. PNL..................................Lighting Panel LVR.......................................................Louver LW PLAST.........................Lightweight Plaster
M.B............................................Machine Bolt MAC RM..................................Machine Room
MAINT.........................................Maintenance MAN.....................................................Manual MAS...................................................Masonry MATL..................................................Material MAX.................................................Maximum M.B.H.................................Mop/Broom Holder
MECH............................................Mechanical MEP............... Mechanical/Electrical/Plumbing
MEMB.............................................Membrane MTL........................................................Metal MEZZ..............................................Mezzanine MFR............................................Manufacturer MH.....................................................Manhole MIN...................................................Minimum MIR........................................................Mirror MISC.........................................Miscellaneous MLDG..................................................Molding M.O......................................Masonry Opening MOD..............................................Module (ar) MTD...................................................Mounted MTG..................................................Mounting MULT...................................................Multiple MWP.......................Membrane Waterproofing
N..............................................................North NA............................................Not Applicable NIC........................................Not in Contract NPRN...............................................Neoprene NO......................................................Number NOM...................................................Nominal NTS............................................Not to Scale O/............................................................Over OA........................................................Overall O.C.................................................On Center OD.......................................Outside Diameter OFCI...Owner Furnished, Contractor Installed
OFOI..........Owner Furnished, Owner Installed
OFF........................................................Office OPNG.................................................Opening OPP...................................................Opposite OPP HD...................................Opposite Hand
OUC........................................Outside Corner OVC............................................Over Current OVFL..................................................Overflow OVHD...............................................Overhead PLBG................................................Plumbing PAR.....................................................Parallel PC, POLYCARB........................Polycarbonate
P.C. CON..........................Pre-Cast Concrete
PCP.........................Portland Cement Plaster
PED...................................................Pedestal PERF..............................................Perforated PERIM..............................................Perimeter PERM.............................................Permanent PERP.........................................Perpendicular PL...........................................................Plate PI.P......................................Poured-in-Place PLAM....................................Plastic Laminate PLAS....................................................Plaster PLYWD, PWD....................................Plywood
PNL........................................................Panel PT, PTD..................................................Paint POL....................................................Polished POLY...........................................Polyethylene POS.....................................................Positive PREFAB.....................................Prefabricated PREFIN..........................................Prefinished PR............................................................Pair PROJ....................................................Project PROP.................................................Property P.SH.............................................Purse Shelf P.T.......................................Pressure Treated PTN....................................................Partition P.T.R.........................Paper Towel Receptacle
PTD.........................................................Paint PV................................................Photovoltaic PVC.....................................Polyvinyl Chloride QT..........................................................Quart QT..................................................Quarry Tile QTR.....................................................Quarter QTY....................................................Quantity QUAL....................................................Quality R.............................................................Riser RAD......................................................Radius RBR.....................................................Rubber RCP.............................Reflected Ceiling Plan
R.D.................................................Roof Drain REC.................................................Recessed RECMD............................Recommend (ation)
REF.............................................Refer (ence) REFR...........................................Refrigerator REINF...................Reinforce (d) (ing) (ment)
REM..............................................Removable REQD...............................................Required REQMTS...................................Requirements
RESIL................................................Resilient RFG....................................................Roofing RGTR................................................Register RH................................................Right Hand RLG.....................................................Railing RM........................................................Room RND.....................................................Round R.O........................................Rough Opening R.W.C..........................Rain Water Conductor
R.W.L................................Rain Water Leader
S............................................................South S.A.D....................See Architectural Drawings
SAN....................................................Sanitary SASF...................Self Adhered Sheet Flashing
SAWDF..Self Adhered Window & Door Flashing
S.B.............................................Splash Block SC.................................................Solid Core S.C.D.................................See Civil Drawings SCHED..............................................Schedule S.DET.....................................Smoke Detector SD...............................................Storm Drain SECT...................................................Section S.E.D.........................See Electrical Drawings
S.EX.D...........................See Exhibit Drawings
SF................................................Square Feet SGL........................................................Single SHT...............................................Sheet (ing) SHV............................................Shelves (ing) SIM.......................................................Similar SL...........................................................Slope S.L.A.D....................See Landscape Drawings
SLV........................................................Sleeve S.M.D......................See Mechanical Drawings
SMS.................................Sheet Metal Screws
SND.......................Sanitary Napkin Dispenser
SNR.....................Sanitary Napkin Receptacle
SPC.......................Suspended Plaster Ceiling
S.P.D.........................See Plumbing Drawings
SPEC...........................................Specification SPKLR...............................................Sprinkler SPKR..................................................Speaker SPLY.....................................................Supply SQ........................................................Square SQ FT..........................................Square Foot SQ IN..........................................Square Inch SQ YD.........................................Square Yard SS...........................................Sanitary Sewer S.STL.. ...................................Stainless Steel S.S.M.B.............Stainless Steel Machine Bolt
S.S.D........................See Structural Drawings
STA......................................................Station STD...................................................Standard STL.........................................................Steel STOR...................................................Storage STRUCT.....................................Structure (al) SURF...................................................Surface SUSP..............................................Suspended SUSP. CLG........................Suspended Ceiling
SVCE...................................................Service SVCE.SK......................................Service Sink S.W....................................................Sidewalk SYM.....................................................Symbol SYS......................................................System T................................................................Tee T.C.S................Terne-Coated Stainless Steel
T.D.R...................Towel Dispenser/Receptacle
T&G.................................Tongue and Groove
TEL..................................................Telephone TEMP....................Temperature or Temporary
TER....................................................Terrazzo THK..................................................Thickness THRES.............................................Threshold THRU..................................................Through TK BD..........................................Tack Board TMPD...............................................Tempered T.O.......................................................Top of T.O.B.........................................Top of Beam T.O.C..........................................Top of Curb T.O.P...................................Top of Pavement T.O.SL..........................................Top of Slab T.O.S...........................................Top of Steel T.O.W...........................................Top of Wall TPH..................................Toilet Paper Holder TRANS.........................................Transparent TRD........................................................Tread NOTE:

1. Not all abbreviations listed below appear in the documents

2. Abbreviations apply whether or not they contain periods

3. Definitions for abbreviations for particular drawings may appear on those drawings. Abbreviations for engineering drawings may appear on the general information sheets for those discipines.

ARCHITECTURAL ABBREVIATIONS
TS..................................................Tube Steel TV.....................................................Television TYP.......................................................Typical UFCI...Owner Furnished, Contractor Installed
UFUI...........Owner Furnished, Owner Installed
UNEX...........................................Unexcavated UNFIN..............................................Unfinished UON...........................Unless Otherwise Noted
UTIL........................................................Utility VAP........................................................Vapor VAP.BAR....................................Vapor Barrier VAP PRF......................................Vapor Proof VAT....................................Vinyl Asbestos Tile VAV..................................Variable Air Volume VB..................................................Vinyl Base VCT..............................Vinyl Composition Tile VDT.............................Video Display Terminal
VENT................................................Ventilator V.E.J.........................Vertical Expansion Joint
VERT....................................................Vertical VEST..................................................Vestibule VFAT........................Vinyl Faced Acoustic Tile
VIF............................................Verify In Field VIN...........................................................Vinyl VNR......................................................Veneer VTR....................................Vent through Roof VWC..................................Vinyl Wall Covering W............................................................Water W.............................................................West W............................................................Width W/............................................................With WO............................................Where Occurs W/O.....................................................Without W/D...........................................Washer/Dryer WC..............................................Water Closet WD..........................................................Wood WDW...................................................Window W GL..............................................Wire Glass W.H..................................................Wall Hung WLD.....................................................Welded WP.........................................Waterproof (ing) W.P............................................Working Point WP MEMB....................Waterproof Membrane
WR.........................................Water Resistant WS........................................Weatherstripping WSCT...............................................Wainscot WT........................................................Weight WTRPRF....................................Waterproofing WSP........................................Wet Stand Pipe

DETAILS ARE NUMBERED ACCORDING TO

THEIR LOCATION ON EACH SHEET AND
ARE NOT NUMBERED CONSECUTIVELY.

EACH MODULE MAINTAINS THE NUMBER

ASSOCIATED WITH IT

THIS SYSTEM CAN BE APPLIED TO ANY

DRAWING THAT CONTAINS MULTIPLE
IMAGES. THE IMAGES ARE NUMBERED

ACCORDING TO THE MODULE SYSTEM

SHOWN ILLUSTRATED TO THE LEFT

EACH DETAIL MAY OCCUPY ONE OR
MORE WHOLE MODULES. THE DETAIL

MODULE IS USED TO ESTABLISH THE

IDENTIFYING LABEL FOR EACH DETAIL,

NOT TO LIMIT THE SIZE OF THE DETAIL

DETAIL MODULE LAYOUT

DETAIL NUMBERING EXAMPLE

THE NUMBER OF THE MODULE WHICH

OCCURS IN THE LOWER LEFT CORNER

OF A SINGLE MODULE OR SEVERAL

MODULES GROUPED TOGETHER WILL

DEFINE THE FINAL DETAIL NUMBER AS

SHOWN IN THE ILLUSTRATION TO THE
LEFT. ALTHOUGH THE MODULE

NUMBERS OCCUR IN CONSECUTIVE

ORDER, NOT ALL NUMBERS ARE

NECESSARILY USED ON EACH SHEET
20 19
18 17
16 15
14 13
12 11
10 9
8 7
6 5
4 3
2 1
10 9
6 5
2 1
8 7
20 19
17 15

MODULAR LAYOUT DETAIL NUMBER

OVERHEAD ROLLING
DOOR

PAIR DOORS - UNEQUAL
SIZES

DOUBLE ACTING DOOR
SINGLE OPENING DOOR 2 PANEL BI-FOLD DOOR

PAIR - BI FOLD DOOR

DOOR OPENING MARK

PAIR DOORS - EQUAL SIZES

PAIR DOORS - DOUBLE
EGRESS

DOOR WITH SIDE LIGHT

SLIDING DOOR - BETWEEN
JAMBS

SLIDING POCKET DOOR
122

INTERIOR GLAZED
WINDOW
122
122 122
122
122 122 122
122
122

DOOR AND INTERIOR OPENINGS SYMBOLS

ARCHITECTURAL MATERIAL INDICATIONS
EARTH

AGGREGATE BASE
COURSE

CONCRETE

CONCRETE MASONRY UNIT

BRICK MASONRY

SOLID SURFACE

STEEL, STAINLESS
STEEL

ALUMINUM
STONE

WOOD FRAMING -

CONTINUOUS

WOOD FRAMING -

DISCONTINUOUS

PLYWOOD

VERTICAL GRAIN WOOD

RIGID INSULATION

MINERAL FIBER INSULATION

BATT INSULATION

PLASTER, MORTAR, SAND, FIREPROOFING,

TERRAZZO

COMPOSITE BOARD

ACOUSTIC CEILING TILE
GLASS

ELEVATION - PLAN - RCP

SECTION

BUILDING PAPER & FABRIC

FLASHING

EXPANDED METAL LATH

WIRE MESH
STONE

HORIZONTAL GRAIN WOOD
WOOD

PLASTER

GYPSUM BOARD

ACOUSTIC PANEL

PERFORATED METAL

GYPSUM BOARD

CEILING

BASE CABINETS

BASE AND WALL

CABINETS

WALL CABINETS

TOILET PARTITION AND
DOOR

TOILET - WALL HUNG

URINAL - FLOOR/WALL
HUNG

LAVATORY - COUNTERTOP

LAVATORY -

PEDESTAL/WALL HUNG

GENERAL SYMBOLS

PLUMBING SYMBOLS
10' - 0"

HANDRAIL

BUMPER GUARD
CG CG

CORNER GUARD

EDGE GUARD

OVERHEAD ITEMS

UNDER-COUNTER
ITEMS
NIC

NOT-IN-CONTRACT
ITEMS
10' - 0"
10' - 0"

JANITOR'S RECEPTOR

DRINKING FOUNTAIN / EWC
EG

DIMENSION SYMBOLS

UTILITY SINK

BATHTUB
SHOWER

FLOOR DRAIN IN SLOPING
FLOOR
FEC
FEC
FEXT
FEC

FIRE EXTINGUISHER

BRACKET MOUNTED

FIRE EXTINGUISHER

SURFACE MOUNTED

FIRE EXTINGUISHER

CABINET

SEMI-RECESSED

FIRE EXTINGUISHER

CABINET RECESSED
DIMENSION SHOWN TO:
- STRUCTURAL GRID
- LAYOUT GRID

GRID LINE TYPICAL
DIMENSION SHOWN TO:
- CENTERLINE OF

ASSEMBLY
- CENTER OF OPENING
- CENTER OF EQUIP/
FURN

CENTER LINE TYPICAL
DIMENSION SHOWN TO:
- PARTITION ASSEMBLY
- EDGE OF DOOR

OPENING
- OTHER BUILDING

ELEMENT
- WPT INDICATED ON
DETAIL
FD

ARCH FLOOR PLAN SYMBOLS

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:31 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt As indicated
G0.02

ARCHITECTURAL

ABBREVIATIONS

AND SYMBOLS

SCCS EDUCATOR

HOUSING
Author
23132

22.31 EXISTING SINGLE STORY BUILDING
& COVERED EXTERIOR PORCH

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:32 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 12" = 1'-0"
G0.11

PROJECT

RENDERINGS

SCCS EDUCATOR

HOUSING
Author
23132

NOT TO SCALE

RENDERING - NE VIEW AT VEHICULAR ENTRY
SCALE: 12" = 1'-0"

RENDERING - NE VIEW OF LOBBY & COMMUNITY ROOM

22.32 PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:34 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 12" = 1'-0"
G0.12

PROJECT

RENDERINGS

SCCS EDUCATOR

HOUSING
Author
23132
SCALE: 12" = 1'-0"
3D VIEW - VIEW FROM DELAWARE ST.

SCALE: 12" = 1'-0"
3D VIEW - SOUTHEAST AERIAL

22.33 PROPOSED BUILDING

PROPOSED BUILDING

PROPOSED BUILDING

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:35 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 12" = 1'-0"
G0.13

PROJECT STREET
VIEWS

SCCS EDUCATOR

HOUSING
Author
23132
SCALE: 12" = 1'-0"
VIEW FROM SWIFT ST. (FROM NORTHEAST)
SCALE: 12" = 1'-0"
VIEW FROM SWIFT ST. (FROM EAST)
SCALE: 12" = 1'-0"
VIEW FROM SWIFT ST. (FROM SOUTHEAST)

22.34 RESIDENTIAL DWELLING NEIGHBORHOOD ON EAST SIDE OF SWIFT NORTH SIDE OF DELAWARE AVE. AT WESTERN BOUNDARY OF SITE:

COMMERCIAL / INDUSTRIAL NEIGHBORHOOD
NORTH SIDE OF DELAWARE AVE. @ SWIFT ST., AT WESTERN BOUNDARY OF SITE:

COMMERCIAL / INDUSTRIAL NEIGHBORHOOD
RESIDENTIAL DWELLING NEIGHBORHOOD ON EAST SIDE OF SWIFT RESIDENTIAL DWELLING NEIGHBORHOOD ON EAST SIDE OF SWIFT LOW-RISE BUILDING ADJACENT TO PROJECT @ SWIFT STREET DEVELOPMENT @ NORTH SIDE OF DELAWARE AVENUE DEVELOPMENT @ NORTH SIDE OF DELAWARE AVENUE DEVELOPMENT ADJACENT TO PROJECT @ SOUTH SIDE OF DELAWARE AVENUE DEVELOPMENT ADJACENT TO PROJECT @ SOUTH SIDE OF DELAWARE AVENUE DEVELOPMENT @ NORTH SIDE OF DELAWARE AVENUE DEVELOPMENT @ NORTH SIDE OF DELAWARE AVENUE DEVELOPMENT @ NORTH SIDE OF DELAWARE AVENUE DEVELOPMENT @ NORTH SIDE OF DELAWARE AVENUE

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 11:33:18 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 12" = 1'-0"
G0.14

NEIGHBORHOOD

CONTEXT IMAGES

SCCS EDUCATOR

HOUSING
Author
23132
SCALE: 12" = 1'-0"

NEIGHBORHOOD CONTEXT IMAGES

22.35 THIS IS A MULTLI-FAMILY HOUSING PROJECT FOR EDUCATORS AND WORKERS EMPLOYED BY SANTA CRUZ CITY SCHOOLS ("SCCS") DISTRICT LOCATED AT 313 SWIFT STREET. THE PROJECT INCLUDES 100 RESIDENTIAL APARTMENT UNITS AND ASSOCIATED SITEWORK. THE DWELLING UNITS WILL BE STACKED FLATS CONSISTING OF

A MIX OF STUDIO, ONE-BEDROOM, TWO-BEDROOM, AND THREE-BEDROOM APARTMENT

UNITS WITH AMENITIES TYPICAL TO SIMILAR BUILDINGS, SUCH AS A LAUNDRY ROOM, COMMUNITY ROOM & LOUNGES AND BIKE STORAGE ROOMS. OFF-STREET SURFACE

VEHICLE PARKING WILL BE ACCOMMODATED WITH SURFACE LOTS ALONG THE NORTH END OF THE SITE. THE PROJECT WILL BE A 4-STORY STRUCTURE TOTALING 120,604 GSF; THE PROJECT PROPERTY ENCOMPASSES 177,584 SF (4.08 ACRES) OF TOTAL SITE AREA AND INCLUDES (2) EXISTING BUILDINGS TO REMAIN ALONG SWIFT STREET AND IS OWNED

BY SCCS DISTRICT

PROJECT DESCRIPTION
PROJECT LOCATION:
313 SWIFT STREET
SANTA CRUZ, CA 95060
APN: 003-16-132
PARCEL AREA: 177,584 SQ. FT. / 4.08 ACRES

ZONING SUMMARY
GENERAL PLAN LAND USE DESIGNATION:

ZONING DISTRICT:

ADJACENT ZONING DISTRICT:

CF (COMMUNITY FACILITES)

PF (PUBLIC FACILITIES DISTRICT)
R-1-5
I-G / PER2

ZONING CONTROLS CHART
F.A.R.

REQUIRED PROPOSED NOTES

2.5 MAXIMUM
(443,960 SQ. FT.)

0.68 (120,604 SQ. FT. / 177,584 SQ. FT.)

PER GENERAL PLAN CF LAND

USE DESIGNATION

DWELLING UNIT

DENSITY
43 DU / ACRE MAX. 24.5 DU / ACRE
100 DU'S
- PER SCMC 24.16.255, MAXIMUM DU /

ACRE DERIVED FROM CALCULATIONS

USING PARCEL COVERAGE, HEIGHT
LIMITS, F.A.R. CAN BE FOUND IN THE

LONGER DESCRIPTION UNDER 'DWELLING
UNIT DENSITY' ON THIS SHEET.
- RESIDENTIAL DENSITY CLASSIFICATION
PER SC GENERAL PLAN 2030 IS M -

MEDIUM-DENSITY RESIDENTIAL
PARCEL

COVERAGE
40% MAXIMUM EXISTING:
3%
(5,439 SQ. FT. / 177,584 SQ. FT.)
NEW:
16%
(28,276 SQ. FT. / 177,584 SQ. FT.)
TOTAL:
19%
(33,715 SQ. FT. / 177,584 SQ. FT.)

DOES NOT INCLUDE UPPER
LEVEL ARTICULATION.

OPEN SPACE 8,000 S.F.
(80 SQ. FT. / 100 DU)
4% OF SITE
53,000 S.F.
(530 S.F. / DU)

29.8% OF SITE
PER SCMC 24.12.185(8)

SETBACKS
FRONT - SWIFT ST.

REAR
SIDE

INTERIOR SIDE
20'
0'
0'
0'
241' - 3"
20' - 8"
70' - 11"
17' - 7"
PER SCMC 24.10.1790(2), SETBACKS ARE:

PER ADJACENT ZONE: R-1-5
PER ADJACENT ZONE: I-G / PER2
PER ADJACENT ZONE: I-G / PER2
PER ADJACENT ZONE: I-G / PER2

OFF STREET

PARKING
0 SPACES
- PER AB 2097
119
- 40 STANDARD / 58 COMPACT
- 3 STANDARD ADA / 3 VAN ADA

PARKING REPORT BY FREAR&PEERS

CALCULATED FULL PARKING
CONTAINMENT AS 1.2 SPACES / 1 DU.

ELECTRIC

VEHICLE

CHARGING
15 12% OF TOTAL SPACES REQUIRED
PER SCMC 24.12.241
BIKE

PARKING
CLASS 1: 100
CLASS 2: 25
CLASS 1: 103
- 55 IN BUILDING BIKE ROOMS
- 48 IN BIKE DEPOTS
CLASS 2: 26
CLASS 1: 1 / 1 DU
CLASS 2: 1 / 4 DU
PER SCMC 24.12.250
HEIGHT 50' MAX. 50' PER SCMC 24.10.1790(1), THE LIMITS ARE:
- 35' IN RESIDENTIAL AREAS
- 50' IN COMMERCIAL/INDUSTRIAL AREAS
15 (INCLUDES 2 ADA EV

CHARGING STALLS)
BIKE

SERVICE STATION
1 2 PER SCMC 24.12.250.3

BUILT ON AN UNDERUTILIZED PARCEL OWNED BY THE SANTA CRUZ CITY SCHOOLS DISTRICT, THE PROJECT AIMS TO ACHIEVE A BEST USE OF THE LAND BY CONSTRUCTING A NEW MULTIFAMILY HOUSING BUILDING TO FILL A CRITICAL GAP IN AFFORDABLE HOUSING OPTIONS FOR THE EDUCATORS WORKING IN THE SCHOOL DISTRICT.

EXISTING CONDITIONS

THE SITE IS CURRENTLY OCCUPIED BY SURFACE PARKING, AN UNCOVERED STORAGE YARD, AND IMPERVIOUS PAVING, AS WELL AS THE FOLLOWING STRUCTURES:
• (1) ONE STORY, 2,077 S.F. ADMINISTRATIVE BUILDING TO REMAIN W/ EXISTING BUSINESS (B) USE. BUILDING IS CURRENTLY OCCUPIED BY THE SANTA CRUZ EDUCATION FOUNDATION, WHICH WILL MOVE OUT PRIOR TO THE START OF CONSTRUCTION. SPACES

PROPOSED TO BE USED BY PROPERTY MANAGEMENT OFFICES AND SUPPORT SPACES FOR THE PROPOSED RESIDENTIAL DEVELOPMENT.
• (1) ONE STORY, 3,308 S.F. EDUCATIONAL BUILDING USED THE WESTSIDE PARENT EDUCATION NURSERY SCHOOL, WHICH WILL MOVE OUT BY JANUARY 1, 2025. THE

BUILDING IS TO REMAIN, BUT THE USE IS PROPOSED TO BE CHANGED TO STORAGE EXCLUSIVELY FOR RESIDENTS OF THE PROPOSED RESIDENTIAL DEVELOPMENT.

EXISTING RESTROOMS TO REMAIN FOR RESIDENT USE ONLY.
• (2) ONE STORY MOBILE, PORTABLE CLASSROOM BUILDINGS USED BY THE SANTA CRUZ OFFICE OF EDUCATION TRANSITION PROGRAM, WHICH WILL MOVE OUT BY JUNE, 2025.

THESE BUILDINGS WILL BE REMOVED FROM THE PROPERTY.

ADDITIONALLY, THE SITE ALSO CONTAINED A BUILDING THAT HAS PREVIOUSLY BEEN DEMOLISHED. A PERMIT FOR THIS DEMOLITION COULD NOT BE LOCATED.

SITE DESIGN
THE SITE ITSELF - 313 SWIFT ST. - IS CURRENTLY OCCUPIED BY TWO EXISTING, SINGLE STORY OFFICE BUILDINGS ON THE EASTERN THIRD OF THE PLOT, THAT ARE TO REMAIN. ONE

OF THESE IS PROPOSED TO BE CONVERTED TO STORAGE USE FOR THE NEW BUILDING'S

RESIDENTS AND THE OTHER WILL HOUSE RESIDENTIAL SUPPORT SPACES SUCH AS PROPERTY MANAGEMENT OFFICES. THE WESTERN TWO-THIRDS OF THE PLOT WILL BE OCCUPIED BY THE PROPOSED 4-STORY RESIDENTIAL STACKED FLAT BUILDING.

THE SITE DESIGN PROPOSED IS INTENDED TO MAXIMIZE DENSITY WITHIN A MINIMAL

BUILDING FOOTPRINT, SO THAT THE REMAINDER OF THE SITE CAN BE DEVELOPED INTO LANDSCAPED AREAS. THE LANDSCAPE PLAN, DESCRIBED ON L1.00, AIMS TO FOSTER A

SENSE OF COMMUNITY IN THE BUILDING'S RESIDENTS THROUGH SHARED OUTDOOR GATHERING SPACES IN A PARK-LIKE SETTING. THIS STRATEGY ALSO ALLOWS FOR THE

INCLUDING OF A LARGER SURFACE PARKING LOT FOR THE RESIDENTS, MINIMIZING

ADDITIONAL STRESS ON ON-STREET PARKING IN THE ADJACENT RESIDENTIAL NEIGHBORHOOD TO THE EAST OF THE SITE.

THE PROJECT ALSO PROPOSED A NEW PEDESTRIAN FOOTPATH FROM SWIFT ST. TO

SERGEANT DERBY PARK, TO FORMALIZE THE CURRENT, INFORMAL ACCESS PATH AS AN ADDITIONAL PUBLIC BENEFIT ON THE SITE.

BUILDING DESIGN

THE BUILDING DESIGN AIMS TO RESPOND TO THE SITE'S URBAN CONTEXT AND UNIQUE

CIRCUMSTANCES AS A ZONE OF TRANSITION BETWEEN THREE DISPARATE URBAN CONDITIONS. THE NEIGHBORHOOD TO THE NORTH AND NORTHWEST IS CHARACTERIZED BY

LARGER, MORE INDUSTRIAL SCALED BUILDINGS AND THEIR RESPECTIVELY LARGER PARCELS; TO THE SOUTH AND EAST, SMALLER, MORE FINE-GRAINED, SINGLE FAMILY, SINGLE STORY HOMES DOMINATE THE NEIGHBORHOOD; DIRECTLY TO THE SOUTHWEST, SERGEANT DERBY PARK IS A GREEN SPACE FOR RESIDENT ENRICHMENT; AND FINALLY, THE OPEN FIELD OF THE GATEWAY SCHOOL THAT TERMINATES AT STOCKTON AVE., WHICH CREATES A VIEW CORRIDOR TO THE OCEAN, 600 YARDS AWAY.

THE GOAL OF THE DESIGN IS ALSO TO ARTICULATE THE SEPARATE UNITS AND RESIDENTIAL

CHARACTER OF THE BUILDING AND ITS INHABITANTS WITHIN THE LARGER, COLLECTIVE FORM OF THE BUILDING AND THE COMMUNITY IT HOPES TO CREATE.

THE BUILDING DESIGN RESPONDS TO THESE CONDITIONS IN THE FOLLOWING WAYS:
• THE BUILDING IS BROKEN UP INTO THREE DISTINCT MASSES, OR WINGS, CONNECTED BY

EXTERIOR BRIDGES, WHICH MIMIC THE SCALE OF THE INDUSTRIAL BUILDINGS AND

REINFORCE THE COLLECTIVE NATURE OF THE NEW COMMUNITY, WHILE ALSO ENSURING THE BUILDING DOES NOT OVERWHELM ITS IMMEDIATE NEIGHBORS. • THE MASSING OF EACH WING IS FURTHER DEFINED INTO LONGER, SIDE-BY-SIDE BARS: A

SHED ROOF VOLUME, INSPIRED BY LARGE SCALE INDUSTRIAL BUILDING TYPOLOGIES,

AND A RECTANGULAR VOLUME WITH ARTICULATED FORMS THAT ARE MORE COMMONLY FOUND ON MID-SIZE RESIDENTIAL BUILDINGS.
• THE WINGS ARE ARRANGED TO PROVIDE A VARIETY OF LANDSCAPE EXPERIENCES, RANGING FROM A "FRONT YARD" AT THE NORTHEAST, BY THE BUILDING LOBBY AND COMMUNITY ROOM, A MORE PRIVATE "BACK YARD" AT THE NORTHWEST, AND A

COMMUNAL INTERIOR COURTYARD THAT ANGLES TO OPEN TOWARD THE VIEW CORRIDOR TO THE BEACH.
• THE ARTICULATION, MODULATION OF PLANES, AND EXPRESSION OF ROOF FORMS ON THE

FACADES ADHERES TO THE SANTA CRUZ RESIDENTIAL OBJECTIVE DESIGN STANDARDS

SO THAT IT CAN HARMONIZE WITH THE RESIDENTIAL CONTEXT WHILE ALSO EXPRESSING THE INDIVIDUALITY OF THE UNITS CONTAINED WITHIN.

DESIGN NARRATIVE
P-F: PUBLIC FACILITIES DISTRICT
USE

THE PROPOSED PROJECT IS BEING SUBMITTED AS A PLANNED DEVELOPMENT PERMIT, WHICH ALLOWS FOR VARIATIONS FROM CODIFIED USES PER SCMC 24.08.720.

RESIDENTIAL USES ARE NOT A PRINCIPALLY PERMITTED USE PER SCMC 24.10.1765 OR A CONDITIONALLY PERMITTED USE PER SCMC 24.10.1770. HOWEVER, SCMC 24.10.1780 STATES:

ANY OTHER USE OR SERVICE ESTABLISHMENT DETERMINED BY THE ZONING

ADMINISTRATOR TO BE OF THE SAME GENERAL CHARACTER AS THE FOREGOING USES,

AND WHICH WILL NOT IMPAIR THE PRESENT OR POTENTIAL USE OF ADJACENT PROPERTIES, MAY BE PERMITTED.

THE PURPOSE OF THE P-F DISTRICT, WHICH, IN SCMC 24.10.1760, IS STATED TO:

DESIGNATE PUBLIC BUILDINGS AND FACILITIES AND TO ENSURE THAT THERE IS A COMPATIBLE RELATIONSHIP BETWEEN SUCH USES AND THE SURROUNDING AREAS.

THE PROPOSED RESIDENTIAL USE IS RESERVED FOR SCCS EMPLOYEES ONLY AND THE BUILDING AND PROPERTY WILL BE WHOLLY OWNED BY SCCS. THIS USE IS ALSO COMPATIBLE WITH THE ADJACENT RESIDENTIAL R-1-5 ZONES TO THE EAST, THE SOUTH (ON THE OTHER

SIDE OF THE GATEWAY SCHOOL) AND THE SOUTHWEST (ON THE OTHER SIDE OF SERGEANT DERBY PARK.

THE PROPOSED RESIDENTIAL USE IS MOST SIMILAR TO THE CONDITIONALLY PERMITTED USES DESCRIBED IN SCMC 24.10.1770(2) WHICH REQUIRE A SPECIAL USE PERMIT AND A DESIGN PERMIT.

HEIGHT
PER SCMC 24.10.1790, THE HEIGHT LIMITS FOR P-F DISTRICTS ARE SET AT:
• 35' FOR RESIDENTIAL AREAS
• 50' FOR COMMERCIAL OR INDUSTRIAL AREAS

AS PREVIOUSLY DISCUSSED WITH THE SANTA CRUZ PLANNING DEPARTMENT, THE HEIGHT LIMIT FOR THE PROPOSED PROJECT WAS SET AT 50' DUE TO THE SITE LOCATION AT THE TRANSITION POINT FROM RESIDENTIAL TO INDUSTRIAL USES.

THE PROJECT PROPOSED IS 4 STORIES, AND 50' HIGH, AS MEASURED TO THE MIDPOINT OF

SLOPED ROOFS, TO ACHIEVE THE GOALS OF MAXIMIZING AVAILABLE AFFORDABLE UNITS, OFF

STREET PARKING, PROVIDING A NEW PEDESTRIAN PATH TO SERGEANT DERBY PARK AND THE

PRESERVATION / ENHANCEMENT OF THE SITE THROUGH ITS LANDSCAPE FOR THE ENJOYMENT OF THE RESIDENTS, GREATER PUBLIC, AND LOCAL WILDLIFE.

SETBACKS
PER SCMC 24.10.1790(2) WHICH STATES:

SETBACKS SHALL REFLECT THOSE REQUIRED BY ADJACENT DISTRICTS.

THE SETBACK REQUIREMENTS ARE AS FOLLOWS:

FRONT - SWIFT ST.: 20' ADJACENT ZONE: R-1-5
REAR: 0' ADJACENT ZONE: I-G / PER2
SIDE: 0' ADJACENT ZONE: I-G / PER2
INTERIOR SIDE: 0' ADJACENT ZONE: I-G / PER2
THE PROPOSED SETBACKS ARE AS FOLLOWS:

FRONT - SWIFT ST.: 241' - 3"
REAR: 20' - 8"
SIDE: 70' - 11"
INTERIOR SIDE: 17' - 7"

THE BUILDING SETBACKS HAVE BEEN INCREASED TO ALLOW MORE SPACE FOR THE FOLLOWING:
• FRONT: TO ALLOW THE EXISTING BUILDING TO BE RETAINED AND TO MINIMIZE THE BULK AT MASSING AT THE INTERSECTION OF THE SITE AND A LOWER DENSITY, PRIMARILY 1 STORY RESIDENTAIL NEIGHBORHOOD.
• REAR: TO ALLOW FOR INCREASED OPEN SPACE AND LANDSCAPING FOR THE BENEFIT OF THE RESIDENTS OF THE PROPOSED DEVELOPMENT.
• SIDE: TO ALLOW FOR A LARGE, OFF-STREET SURFACE PARKING LOT FOR THE BENEFIT OF

THE RESIDENTS AND TO LIMIT THE IMPACT ON EXISTING PARKING IN THE ADJACENT RESIDENTIAL NEIGHBORHOOD.
• INTERIOR SIDE: TO ALLOW FOR THE CREATION OF A NEW PUBLIC PEDESTRIAN PATH FROM SWIFT ST. TO SERGEANT DERBY PARK.

PLANNING & ZONING ANALYSIS

PERMITTING NARRATIVE

THE PROPOSED PROJECT IS PURSUING A PLANNED DEVELOPMENT (PD) PERMIT UNDER THE GUIDELINES OF SCMC 24.08.700 AND CONFORMS TO THE PURPOSE OF SAID PERMIT IN THAT:
• THE PROJECT AIMS TO ADDRESS THE HOUSING AFFORDABILITY CRISIS FACING PUBLIC

EDUCATORS, SPECIFICALLY THOSE EMPLOYED BY SCCS, SERVING THE PUBLIC OBJECTIVE OF RETAINING CRITICAL PUBLIC EDUCATORS. RESIDENTIAL USES ARE NOT AN ALLOWABLE USE PER THE P-F ZONE. (SCMC 24.08.700(A)(1)
• THE DEVELOPMENT OF THE PARCEL IN QUESTION AIMS TO ESTABLISH A NEW AND

INNOVATIVE PATH FOR CALIFORNIA SCHOOL DISTRICTS TO ACHIEVE THE HIGHEST AND

BEST USE OF THEIR UNDER-UTILIZED PROPERTIES, PROVIDING A CASE STUDY FOR OTHER

TO FOLLOW AS THEY SEEK TO ADDRESS THE HOUSING AFFORDABILITY CRISIS FACING PUBLIC EDUCATORS. (SCMC 24.08.700(A)(2))
• PER SCMC 24.10.1760, THE P-F DISTRICT IS PART OF THE LOCAL COASTAL IMPLEMENTATION PLAN. (SCMC 24.08.700(B))

AS PART OF THE PD PERMIT, THE FOLLOWING PERMITS WILL ALSO BE SUBMITTED IN SUPPORT OF SAID PERMIT, AS REQUIRED BY THE SANTA CRUZ PLANNING DEPARTMENT:
• DESIGN PERMIT
• COASTAL PERMIT
• HERITAGE TREE REMOVAL PERMIT

STANDARD BUILDING PERMITS WILL BE SUBMITTED AS REQUIRED FOLLOWING THE PD PERMIT APPROVAL.

OFF STREET

LOADING
1 TYPE A
24' x 8'
1 TYPE A
24' x 8'
PER SCMC 24.12.295:

RESIDENTIAL USE, 51-200 UNITS: 1 TYPE A

OFF STREET PARKING
NO PARKING IS REQUIRED PER AB 2097, AS CONFIRMED BY THE SC PLANNING DEPARTMENT.

FOR REFERENCE ONLY, THE OFF STREET PARKING REQUIREMENTS, PER SCMC 24.12.240 ARE AS FOLLOWS:
• EXISTING BUSINESS USE: 5,490 S.F. / 300 S.F. = 19 PARKING SPACES • EXISTING PARKING PROVIDED: 47 PARKING SPACES (45 STANDARD / 2 ADA)

THE EXISTING BUSINESS USES WILL BE VACATED PRIOR TO CONSTRUCTION AND THE

BUILDINGS THEY ARE HOUSED IN WILL BE WHOLLY USED BY THE NEW RESIDENTIAL DEVELOPMENT.

NEW RESIDENTIAL USE
39 STUDIO AND 1 BR UNITS X 1 = 39 PARKING SPACES
61 2 BR AND 3 BR UNITS X 2 = 122 PARKING SPACES
RESIDENTIAL PARKING TOTAL = 161 PARKING SPACES
10% GUEST UNITS = 16 PARKING SPACES
TOTAL SPACES REQUIRED 177 PARKING SPACES
(WITHOUT AB 2095)
PARKING STUDY BY FEHR & PEERS DETERMINED THAT 1.2 PARKING SPACES WERE REQUIRED TO MEET FULL ON-SITE PARKING CONTAINMENT. CONSEQUENTLY, WE HAVE DESIGNED THE PARKING TO MEET THAT. A LARGE PORTION OF THE PARKING SPACES ARE LOCATED BEHIND A

SECURE, RESIDENT-ONLY GATE, WITH THE REMAINDER INTENDED TO BE USED BY GUESTS

AND THE EMPLOYEES OCCUPYING THE ADMINISTRATIVE OFFICES FOR THE NEW RESIDENTIAL BUILDING:

PROPOSED PARKING:

STANDARD: 40
COMPACT: 58 (48.7% OF TOTAL)
EVSE: 15 (12.6% OF TOTAL)
ADA-STANDARD: 3 (1 EVSE CAPABLE)
ADA-VAN 3 (2 EVSE CAPABLE)
TOTAL: 119

PROPOSED GUEST / EMPLOYEE PARKING, WHICH IS TO BE PUBLICLY ACCESSIBLE, LOCATED ON THE EXTERIOR SIDE OF THE PARKING LOT GATE AND ACCESSED OFF OF SWIFT ST., IS THE FOLLOWING:

STANDARD: 10
COMPACT: 12
ADA-VAN: 1
TOTAL: 23 (18% OF TOTAL)
(INCLUDED IN COUNT ABOVE)

EVCE PARKING
SCMC 24.12.241(3)(a) REQUIRES THAT NEW MULTIFAMILY RESIDENTIAL STRUCTURES WITH FIVE OR MORE UNITS REQUIRES THAT 12% OF TOTAL PARKING HAVE ELECTRIC VEHICLE SUPPLY EQUIPMENT INSTALLED:

TOTAL PARKING SPACES: 119
TOTAL EVSE SPACES: 15
PERCENT EVSE SPACES: 12.6%

OFF STREET LOADING
SCMC 24.12.295(3)(A) REQUIRES THAT NEW MULTIFAMILY RESIDENTIAL STRUCTURES WITH BETWEEN 51 - 200 UNITS PROVIDE 1 TYPE A (MINIMUM SIZE OF 24' LONG x 8' WIDE) OFF-STREET LOADING SPACE:

OFF STREET LOADING SPACES PROVIDED: 1 TYPE A

BICYCLE PARKING
SCMC24.12.250 SETS FORTH THE BIKE PARKING REQUIREMENTS FOR NEW MULTIFAMILY RESIDENTIAL DEVELOPMENTS WITH 3+ UNITS AS FOLLOWS:

CLASS 1 - 1 PER UNIT
CLASS 2 - 1 PER 4 UNITS
1 FIX-IT STATION FOR PROJECT WITH 20+ SPACES
5% TOTAL SPACES TO BE LARGE FOOTPRINT MINIMUM
REQUIRED SPACES:

CLASS 1 - 1 SPACE x 100 UNITS: 100 SPACES
CLASS 2 - 100 UNITS / 4: 25 SPACES
FIX-IT STATION: 1 STATION

LARGE FOOTPRINT SPACES
125 SPACES x .05: 6 SPACES
PROVIDED SPACES:

CLASS 1: 103 SPACES
CLASS 2: 26 SPACES
FIX-IT STATIONS: 2 STATIONS
LARGE FOOT PRINT SPACES: 6 SPACES

OPEN SPACE
SCMC 24.10.1790 DOES NOT SPECIFY OPEN SPACE REQUIREMENTS IN THE DISTRICT REGULATIONS FOR THE P-F DISTRICT. HOWEVER, SCMC 24.12.185(8)(c) DEFINES

REQUIRED OPEN SPACE FOR SPECIFIC DISTRICTS THAT ALLOW RESIDENTIAL USES AS FOLLOWS:
• PRIVATE USABLE OPEN SPACE MUST BE AT LEAST 4' IN ANY HORIZONTAL DIMENSION AND COMMON USABLE OPEN SPACE MUST BE AT LEAST 15' IN ANY HORIZONTAL DIMENSION.
• THERE SHALL BE NO LIMIT TO THE PERCENT OF THE REQUIRED OPEN SPACE

THAT MAY BE ASSIGNED TO PRIVATE BALCONY OR PATIO AREAS
• NO LESS THAN 25% OF THE TOTAL COMMON OPEN SPACE SHALL BE PERMANENTLY LANDSCAPED WITH LIVE PLANT MATERIAL....

ADDITIONALLY, SCMC 24.12.185(8)(c) DEFINES REQUIREMENTS FOR SPECIFIC LANDSCAPE FEATURES THAT ARE TO BE INCLUDED IN COMMON OPEN SPACES.

DOCUMENTATION SHOWING COMPLIANCE WITH THESE REQUIREMENTS ARE SHOWN ON THE LANDSCAPE PLANS, SPECIFICALLY SHEET L1.00 - LANDSCAPE SITE PLAN.

FOR REFERENCE, SCMC 24.12.185(8)(a) AND 24.12.185(8)(b) DEFINE REQUIRED OPEN SPACE AS FOLLOWS:
• C-C, R-T(C), C-T, C-N C-B, PA AND ALL MU DISTRICTS:
- 40 S.F. OF PRIVATE OPEN SPACE PER DU
- 20 S.F. OF COMMON OPEN SPACE PER DU
- COMMON OPEN SPACE MAY BE SUBSTITUED FOR PRIVATE OPEN SPACE AT A RATIO OF 2:1 (80 S.F. OF COMMON SPACE MAY BE SUBSTITUTED FOR 40 S.F. OF COMMON SPACE).
• IN ALL R-DISTRICTS AND IN THE R-T(A), R-T(D) AND R-T(E) DISTRICTS, THE

AMOUNT OF OPEN SPACE SHALL BE DETERMINED BY THE UNDERLYING ZONE DISTRICT STANDARD, WHICH RANGES FROM 250 S.F. TO 400 S.F. OF USABLE OPEN SPACE PER DU.

THE DESIGN OF THE PROJECT MAKES USES OF THE HEIGHT LIMIT VARIATION TO

CONCENTRATE THE BUILDING FOOTPRINT, FREEING UP MORE OF THE SITE FOR

LANDSCAPING AND OPEN SPACE, TO EXCEED THE REFERENCED REQUIREMENTS AS FOLLOWS:

OPEN SPACE CALCULATIONS
PROVIDED: PRIVATE OPEN SPACE: 1,800 S.F.
(FOR 22 LEVEL 1 UNITS ONLY)
COMMON OPEN SPACE: 51,200 S.F.

TOTAL OPEN SPACE: 53,000 S.F.

COMMON OPEN SPACE PER DU: 530 S.F. / DU

DWELLING UNIT DENSITY

THE DISTRICT REGULATIONS FOR A P-F DISTRICT DO NOT DEFINE A MAXIMUM DWELLING UNIT DENSITY. HOWEVER, PER SCMC 24.16.255, OTHER LIMITATIONS, SUCH AS F.A.R, HEIGHT, PARCEL COVERAGE AND AVERAGE UNIT SIZES, CAN BE USED TO

EXTRAPOLATE AN IMPLIED MAXIMUM DWELLING UNIT DENSITY, AS DESCRIBED IN THE FOLLOWING STEPS:

1. THE MAXIMUM BUILDING FOOTPRINT CAN BE FOUND BY MULTIPLYING THE SQUARE FOOTAGE OF THE SITE BY THE MAXIMUM PARCEL COVERAGE:
177,584 SQ. FT. PARCEL SIZE x .4 = 71,033 SQ. FT.

2. THE MAXIMUM BUILDING SIZE CAN BE FOUND BY MULTIPLYING THE BUILDING FOOTPRINT BY THE NUMBER OF STORIES ALLOWED BY THE CURRENT HEIGHT LIMITS:
35' HEIGHT LIMIT / 10' FLOOR-TO-FLOOR HEIGHT = 3.5 = 3 STORIES 71,033 SQ. FT. x 3 STORIES = 213,099 SQ. FT.

3. THIS MAXIMUM BUILDING SQUARE FOOTAGE IS UNDER THE MAXIMUM SQUARE FOOTAGE ALLOWED PER F.A.R. CALCULATIONS:
172,584 SQ. FT. PARCEL SIZE x 2.5 = 443,960 SQ. FT.

4. TO FIND THE DWELLING UNIT DENSITY, THE MAXIMUM BUILDING SQUARE FOOTAGE IS DIVIDED BY THE AVERAGE UNIT SIZE OF THE PROPOSED PROJECT:
120,601 SQ. FT. / 100 DU = 1,206 SQ. FT. AVG DU SIZE
213,099 SQ. FT. / 1,206 SQ. FT. = 176 DU

5. FINALLY, THE MAXIMUM DWELLING UNIT DENSITY CAN BE FOUND BY DIVIDING THE MAXIMUM DWELLING UNIT COUNT BY THE SIZE OF THE SITE:
176 DU / 4.08 ACRES = 43 DU / ACRE MAXIMUM

PLANNING & ZONING ANALYSIS
LOT AREA NO MINIMUM 177,584 SQ. FT. / 4.08 ACRES PER SCMC 24.10.790, NO MINIMUM LOT AREA IS LISTED.

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:40 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 12" = 1'-0"
G0.15

PLANNING &

ZONING SUMMARY

SCCS EDUCATOR

HOUSING
Author
23132
FORMAL APP BACKCHECK 08.30.2024
FORMAL APP BACKCHECK 2 11.01.2024

22.36 SERGEANT
DERBY
PARK
1 2
3 4
5 6
7 8

GATEWAY SCHOOL FIELD SERGEANT
DERBY
PARK
1 2
3 4
5 6
7 8

GATEWAY SCHOOL FIELD SERGEANT
DERBY
PARK
1 2
3 4
5 6
7 8

GATEWAY SCHOOL FIELD

SERGEANT
DERBY
PARK
1 2
3 4
5 6
7 8

SERGEANT GATEWAY SCHOOL FIELD
DERBY
PARK
1 2
3 4
5 6
7 8

SERGEANT GATEWAY SCHOOL FIELD
DERBY
PARK
1 2
3 4
5 6
7 8

GATEWAY SCHOOL FIELD

ADJACENT BUILDING HEIGHTS

1. 28' - 0" - 1 Story

2. 21' - 6" - 1 Story

3. 15' - 0" - 1 Story

4. 15' - 0" - 1 Story

5. 21' - 0" - 1 Story

6. 21' - 0" - 1 Story

7. 21' - 0" - 1 Story

8. 21' - 0" - 1 Story

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:43 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt As indicated
G0.16

SHADOW STUDIES

SCCS EDUCATOR

HOUSING
BK
23132
G0.16 NOT TO SCALE
5 December 21 at 3:00 PM
G0.16 NOT TO SCALE
3 December 21 at 12:00 PM
G0.16 NOT TO SCALE
1 December 21 at 9:00 AM
G0.16 NOT TO SCALE
2 June 21 at 9:00 AM
G0.16 NOT TO SCALE
4 June 21 at 12:00 PM
G0.16 NOT TO SCALE
6 June 21 at 3:00 PM
N
N
N
N N
N

22.37 PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:50 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt G0.21

CODE ANALYSIS

SCCS EDUCATOR

HOUSING
Author
23132
FORMAL APP BACKCHECK 08.30.2024

22.38 42" TT TREE
42" TT TREE
16" TREE
12" PINE
22" MT TREE
16" RDWD
16" RDWD
16" RDWD
16" RDWD
18" RDWD
46" STUMP
6" TREE
6" TREE
38" STUMP
36" STUMP
38" STUMP
16" TT TREE
18" MT TREE
4" TREE
4" TREE
4" TREE
4" TREE
6" TREE
5" TREE
20" TREE
IRR
RI R
UTIL. RISER
UT LI . RISER
UTIL.

UTIL.

51.67 51.70

52.46 52.39

52.39 53.93

53.94 55.64 82

56.30 55.9
59 6.20

56.18 56.19

56.30 56.32

55.94 55.97

56.01 55.7063

56.14 55.84

55.88 55.88

55.77 55.7
5 0

5.69 55.66

55.63 55.65

55.04 55.06

55.03 55.34

55.73 55.75

56.27 56.26

56.32 54.48 55.00 4.32

54.69 55.17 4.66

55.28 54.96

53.91 4.74

54.2289

54.37 54.62

55.02 54.57 55.12

54.64 54.89

54.46 70.96
TOP
TOE
TOE
TOE
TOE
TOE
TEL
TV
TEL
EB
TV
TEL

52.58 54.37

52.43 52.91

49.97 50.06

53.85 47.64

52.67 50.06

52.81 53.78

51.01 53.30

55.57 55.69

54.50 54.08
EB
EB
SL
EB
FW
WM
FW
WM
GB
GB
GB
GB
GB
GB
GB

BASKETBALL COURT

DRINKING

FOUNTAIN
(E)

BUILDING
SHED
RAMP
GATE

CLF CLF
GATE
DENSE

VEGITATION
HEDGE
HEDGE
(E)

BUILDING
(E)

BUILDING

STORAGE SHED
(E)

BUILDING
BLOCK
WALL

BUSINESS SIGN

SEWER BOX
SCHOOL

CROSSING

PARKING
SDCB
RIM=53.61'
INV=51.83'
METAL

AWNING (E)

BUILDING
RAMP
(E)

MODULAR
(E)

MODULAR
RAMP
GATE
SDCB
RIM=53.59'
INV=51.59'
SDCB
RIM=53.33'
INV=46.93'

PLANTER
SDCB
RIM=53.39'
INV=46.84'
SDCB
RIM=53.49'
INV=46.69'
LANDING@DOOR
=54.82'
LANDING@DOOR
=54.85' HOSE
BIB
SDMH
RIM=53.59'
INV=47.09'
SDCB
GRATE=49.07'
INV=46.22'
SDMH
RIM=51.50'
INV=46.20'
SDMH
RIM=48.70'
INV(N)=39.03'
INV(S)=38.83'
SDMH
RIM=50.33'
INV(N)=40.99'
INV(S)=40.87'

SCHOOL S GI N
STOP
SIGN
AHEAD

PARKING
SDCB
GRATE=50.05'
INV=47.27'

DR VI EWAY

DR VI EWAY
SDCB
GRATE=49.16'
INV=44.26'
SSMH
RIM=48.77'
INV(N)=43.58'
INV(E)=43.44'
SSMH
RIM=51.99'
INV(N)=43.99'
INV(S)=43.93'
1-1/2" WATER PIPE
HOSE
BIB
CC@DOOR
=53.92'
CC@DOOR
=53.95'
CC@DOOR
=53.96'
CC@DOOR
=53.95'
CC@DOOR
=53.94'
CC@DOOR
=53.91'
CC@DOOR
=53.94'
CC@DOOR
=53.93'
CC@DOOR
=53.97'
CC@DOOR
=53.95'
CC@DOOR
=53.96'
1-1/2" WATER PIPE

PARKING
CLF
CLF
CLF
CLF

THRESHOLD
=53.90'
(E)

BUILDING

THRESHOLD
=53.87'

THRESHOLD
=53.84'
HOSE
BIB

CLUSTER
GROUP

MAILBOXES
GATE

GATE TRASH

ENCLOSURE

PLANTER
S GI N

DRIVEWAY
3"
CURB
DRAINS
SDCB w/
PUMP
GRATE=55.04'
INV=52.04'

AREA DRAIN
RIM=55.09'
INV=53.36'
NO

PARKING/
END
SDCB
GRATE=53.61'
INV=51.11'
SDCB
RIM=53.45'
INV=51.53'

THRESHOLD
=55.80'

BOLLARD LIGHT

GROUND LIGHT

PARKING

METAL FENCE
NO

PARKING

51.9 5
9 1.99

51.98 50.3
5 3

0.34 50.32

49.24 49.14 49.63

49.72 49.92

49.94 49.81 49.36

49.42 49.35

49.40 49.72

49.18 49.16

49.35 49.16

49.25 49.36

49.59 50.09

50.17 50.47

50.36 50.32

49.91 50.02

50.40 50.54

50.49 50.53

50.04 50.17

50.42 50.31 50.76

50.85 51.08

51.00 50.54

50.62 50.91

50.81 51.27

51.33 51.51

51.44 50.98

51.09 51.25

51.14 51.61

51.71 51.90

51.7951.34

51.46 51.58

51.43 51.89

51.97 51.97

52.09 51.56

51.80 52.15

51.66 52.07

52.54 52.45

52.00 52.12

52.23 52.11 52.58

52.64 52.90

52.80 52.32

52.47 52.76

52.57 52.98

52.75 52.61

52.44 52.29

52.14 52.02

51.86 51.69

51.50 51.27

51.08 50.85

50.60 50.35

50.16 49.95

49.72 49.86

49.86 50.11

50.15 50.34

50.61 50.82

50.85 51.03

51.05 51.25

51.28 51.42

50.06 50.26

50.45 50.65

50.94 51.14

51.37 51.58

51.81 52.00

52.14 52.32

52.53 52.80

53.07 53.35

52.89 52.71

52.58 52.54

53.06 53.02

53.05 53.44

53.61 53.79

53.79 53.99 53.78

53.56 53.55

53.70 53.64

53.69 53.57

54.21 53.28

53.27 53.68

53.89 54.78 54.68

54.78 53.90

54.13 55.23

55.02 54.13

54.03 53.34

53.56 53.18

52.79 52.68

53.05 52.97

53.43 52.73

52.73 53.63

53.86 53.42

53.14 53.10

52.61 52.29

52.10 52.21

52.09 52.07

53.69 53.63

53.65 53.66

53.76 54.00 3.8453.95

53.77 53.56

53.48 53.46

53.46 53.58

52.05 51.92

53.34 51.94

51.64 51.58

51.68 52.55

53.31 53.44

52.02 51.66

51.45 51.34

51.10 51.40

50.38 50.07

50.06 50.06

50.04 50.0
56 0.06

50.05 51.09

51.21 50.81

50.61 52.54

53.7953.89

53.93 53.95

53.90 53.89

53.93 53.92

53.92 53.91

53.91 53.93

53.93 53.92

53.91 53.91

53.91 53.94

53.95 53.93

53.90 53.93

53.93 53.90

53.92 53.92

53.92 53.7493

53.93 53.82

53.77 53.91

53.92 53.91

53.93 53.93

53.93 53.94

52.82 51.86

51.52 51.44

51.27 51.29

51.33 51.34

51.69 51.67

51.65 51.69

52.23 52.25

52.26 52.58

52.63 52.67 2. 1

52.60 52.56

52.64 53.21

53.55 53.72

52.87 51.85

53.30 53.19

53.31 53.06

52.12 50.62 50.62

50.88 51.12

51.36 51.57

51.67 51.84

54.02 53.96

48.74 48.7
4 0

8.73 48.68

48.7 47

8.78 48.79

49.86 49.99

50.03 49.90 9.8

49. 6
83 49.81

50.49 50.39

50.1 50.
6 16

50.11 50.39

50.54 50.44

50.62 50.5

50. 5
55 50.58

50.34 50.68 0.70

50.50 50.80

50.80 50.77

51.50 51.86 51.91

51.77 51.75

52.40 52.56 52.57

52.43 52.4
52 2.56

52.56 52.30

52.18 2.50

51.83 51.90

51.18 50.53

52.20 52.27

52.41 52.39

52.70 52.74

52.70 52.72

52.75 52.74

52.74 52.74

52.76 52.38

52.35 52.45 52.45

51.92 52.14 52.23

52.14 50.57

50.71 50.09

49.71 49.71

49.65 49.66

49.08 49.09

49.05 49.07 50.08

49.86 50.15

50.21 50.74 50.93

51.35 51.19

51.38 51.51

51.71 51.65

51.95 51.93

52.45 52.60

52.81 52.86

53.82 53.81

53.77 53.77

53.83 53.824

52.79 52.72

52.71 52.72

52.64 52.70

52.92 52.83

51.30 51.20

52.52 52.41

52.56 51.43

50.95 50.88

50.90 50.66

50.67 50.53

52.53 52.62

52.58 52.47

52.29 52.46

52.33 52.62 52.57

52.70 52.60

52.59 52.71

52.66 52.67

52.66 52.76

52.77 52.74 52.79

52.79 52.68 52.55

52.58 52.72

52.79 52.72 52.53

52.08 52.27

52.1 5
3 2.21

51.54 51.06

51.54 51.80

51.87 52.00

52.16 52.51

52.70 52.24

51.89 52.05

51.78 51.59

51.40 51.53

51.3312

50.71 50.84

50.30 50.23

50.10 50.73

52.77 52.24

51.68 52.62

52.76 52.64

53.00 53.10

53.10 53.11

53.25 52.05

53.49 53.50 3. 8

53.30 3.21

53.071

53.29 53.32

53.82 53.63

53.78 52.34

52.68 53.02

52.84 52.71

53.28 53.26

52.68 2. 7

53.10 3.24

53.71 53.37

53.80 53.16

53.1 57

2.93 53.82

53.80 53.78

53.75 53.75

53.77 53.78

53.85 53.86

53.77 53.76 53.77

53.74 53.76

54.82 54.86

54.87 54.81

54.83 54.84

54.85 53.80

53.82 54.83

54.84 54.82

54.92 54.82

54.82 54.82

53.92 53.94

53.93 53.63 53.75

53.70 53.62

53.66 53.74

53.785

54.08 54.01

53.93 53.67

53.3 53.
9 51

53.57 53.57

53.62 53.70

53.80 53.67

53.49 53.95

53.87 53.97

53.94 53.91

53.89 53.75 3. 7

53.76 3.

53.65 53.78

53.77 53.69

53.68 53.77

53.78 3.80

54.40 54.38

54.14 53.80

54.00 53.9

53. 9
98 53.93

53.79 54.06

53.97 54.00

53.96 53.95 53.94

53.9 53.
1 94

53.93 3.79

53.96 3. 5

53.89 53.81

53.81 53.88

53.87 53.81

53.81 53.82

53.88 53.88

53.88 53.88

53.59 53.82

53.91 53.88

53.94 54.00

53.99 53.96

53.94 53.95

53.94 53.93

53.93 53.9453.94

53.9 53.
5 96

53.93 53.94

53.95 53.94

53.94 53.94

53.96 53.87

53.84 53.93

53.86 53.94

53.78 53.68

53.94 53.95

53.97 53.94

54.13 54.09

53.97 54.02

54.11 54.14

53.93 53.92

53.92 53.88 3.

53.83 53.88

53.57 53.40

53.60 3.56

53.59 53.67

53.69 53.72

53.77 53.77

53.77 53.33

52.64 52.70

52.78 52.80

52.71 52.75

52.79 52.84 52.85

53.88 53.86 53.90

53.87 53.82

52.90 2.

52.89 52.94

52.97 53.74

53.78 53.79 53.66

53.81 53.86

53.8 5
7 3.62

53.60 53.64

53.41 53.66 53.46 3. 0

53.19 3.15

52.88 93

52.81 2.60

53.02 53.11

53.29 51.75

51.38 51.35

51.11 51.12

50.87 50.78

50.84 50.85

50.87 50.87

50.89 50.83

50.76 50.78

50.75 50.78

50.91 51.12

53.00 51.26

50.91 51.13

50.96 50.61

50.72 50.61

51.13 50.70

51.04 51.08

50.75 51.00

50.70 50.56

50.37 50.74

50.76 51.23

50.54 50.26

50.80 50.50

50.84 50.96

50.74 50.82

50.94 50.54

50.29 50.23

50.19 49.92

49.95 49.91

49.91 49.93

49.96 50.13

50.94 51.11

53.82 53.94

53.93 53.94

53.98 53.91

53.90 53.96

53.96 53.96

53.94 53.71

53.77 53.61

53.86 53.95

53.97 53.97

53.96 53.96

54.66 54.00

54.09 54.23

54.45 5

4.62 54.44

54.32 55.04

54.84 54.56

52.75 52.82

52.57 52.18

52.75 52.78

52.70 52.84

53.06 53.12

53.12 52.79

53.03 54.20

54.57 53.36

52.82 52.78

52.73 52.81

52.77 52.60

52.51 52.39

52.39 52.48

52.28 51.88

52.70 52.52

51.41 51.22

53.98 54.13

54.41 54.50

54.58 54.43

54.46 54.89

55.02 55.32

55.09 54.88

55.64 55.50

55.97 55.89 55.45

55.59 55.59

55.44 55.85

55.83 55.37

55.53 55.47

55.32 55.42

55.28 55.71

55.72 55.30

55.38 55.28

55.28 55.36

55.22 55.635

55.4659

55.15 55.30

55.54 55.58

55.61 55.63

55.69 55.76

55.82 55.86

55.90 56.05 56.06

56.08 56.02

56.00 55.95

55.92 55.99

55.938

55.8755.93 55.90

55.86 55.86 55.842

55.840

55.8069

55.5765

55.83 56.01

55.97 55.72

55.90 55.91 56.17 55.78

55.44 55.85 55.61

55.43 55.795

55.96 6.03 55.62

55.89 56.32

56.10 56.321

56.20 56.23

56.84 56.72

56.73 56.32

56.34 56.16 55.94

56.06 56.31

56.33 55.62 55.68

55.63 55.54

55.6271

55.56 55.72 56.05 5.97

56.31 56.57

56.76 56.76

56.76 56.74

56.58 56.83 55.89 93

55.923

56.50 57.17

57.10 56.02

56.08 56.04

56.15 56.26

55.04 55.08

55.25 55.38

55.35 55.41

55.32 55.75

55.07 55.10

55.09 55.64 55.74 55.75

56.51 56.46

55.85 55.46

55.26 55.56

55.64 56.07 5.83

55.63 55.24

55.17 55.00

55.02 54.92

54.82 54.73

54.56 54.69

55.09 4.6354.69 5.1 54.73

54.71 55.10 4.68

54.38 55.04

54.55 54.49

54.40 55.0

54.56 54.28

54.46 54.68

54.86 55.07

55.36 55.61

55.45 55.41

55.25 55.11

54.91 54.75

54.69 54.69 55.22 54.71

54.78 55.26 54.79

54.85 55.28

54.87 55.00 55.2805

55.04 55.30

55.08 55.37

55.1 5
6 5.41

55.35 55.48

55.53 55.59

55.60 55.67

55.73 55.79

55.82 55.83 55.64 57.28

56.53 56.52 55.9087

55.704

55.59 5.62

55.59 55.59

55.62 55.53

55.4857

55.49 55.42

55.34 55.45

55.4532

55.29 55.39 55.38

55.36 55.47

55.46 55.44

55.23 53.98

53.89 53.91

53.90 53.90

53.92 54.00

54.04 54.49 54.46

54.35 54.80 54.12

54.23 54.23

54.29 54.77 54.07

53.94 53.63

53.63 53.59

53.61 53.58

53.79 53.90 54.29

53.57 53.50

53.49 53.48

53.45 54.16

54.08 53.98

53.92 53.91

53.96 55.2
5 2

5.25 55.7549

55.62 55.35

55.17 55.1
5 1

5.16 54.89 55.3821

55.39 54.85 54.49

54.9247

54.45 54.48

54.96 54.31

54.52 54.70

54.31 54.98

54.57 54.62 55.02

54.62 55.0
5 2

5.07 54.75

54.65 55.06

54.65 55.12

55.14 54.74

54.94 54.615 46

54.46 54.60

55.05 54.55

54.61 55.06 4.55

54.75 54.76 54.82

54.78 55.2706

54.80 54.86 55.2
50 4.84

54.72 54.68 55.23

54.70 54.82

55.24 54.80

55.16 55.18 54.76

54.71 55.13 54.30

54.45 55.12 54.62

54.6453

54.46 54.91

55.24 55.38

55.41 55.3
5 2

6.86 56.86

56.86 56.86

55.38 55.38

55.17 55.16 55.05

54.90 55.16

54.72 4. 6 55.18 4.93

54.85 54.63

54.21 54.14

54.09 54.39 54.9366

54.48 54.94 54. 754.46 5.01

54.57 54.79

54.31 54.24 54.26 54.7459

54.49 54.67

54.24 54.35

54.3254.8358

54.74 54.36

54.48 54.936

54.93 55.02

54.67 54.91

54.41 54.46 54.92 54.77

54.84 54.41

54.42 54.36

54.49 54.96

54.54 54.86

54.49 54.95 54.48

54.41 54.89

54.21 54.78 54.69

54.69 54.71

54.22 54.35

54.9288

54.9855.04 54.26

54.78 54.28

54.25 54.02

54.48 55.0254.69

54.6085

54.36 54.30

54.83 54.60 54.5178

54.43 54.49

54.735 58

54.64 54.89

55.24 54.89

55.25 55.06

54.74 4.88

54.78 54.51

54.85 54.92

54.67 54.66

54.66 54.50

54.22 54.09

54.18 54.14

54.06 53.51

53.90 54.96

54.86 54.57

54.46 54.49

54.63 54.95

55.08 54.71

55.14 55.09

55.04 55.04

54.65 54.59 54.99 54.60

54.39 54.95

54.55 54.48

54.93 54.27

55.17 54.96

55.17 55.13

55.13 55.12

55.13 55.13

71.12 55.40

55.59 54.96

55.22 55.76

55.78 55.80

55.26 55.60 55.47

54.48 54.56

54.60 55.06
5,000, 5,000
CO
UV
CO
CO
CO
SSCO
WV
WV
CO
D
CO
D
D
D
CO
WV
S
S
DS
DS DS
DS
DS
DS
DS
DS
DS DS
GM
GM
DS
H Y D
DS
7"/8"/4" ACER
46" STUMP
38" STUMP
36" STUMP
38" STUMP
13"/8.5" QUERCUS
5"/4"/3" POPULUS

56.5" HESPEROCYPARIS
22" STUMP
62" AT 12"> GROUND

HESPEROCYPARIS
4"/3"/3" DODONEA
8"/12" POPULUS
14"/16" POPULUS
25+" POPULUS
6" PRUNUS 4" MALUS
44" PINUS

7.5"/7"8"/5.5" CINNAMOMUM
25+" POPULUS
40" POPULUS
8"/17" POPULUS
14" POPULUS
11" PINUS
18" SEQUOIA

16.5" SEQUOIA
17" SEQUOIA

16.5" SEQUOIA
20" SEQUOIA
21" JUGLANS
16" TT TREE 18" MT TREE
4" TREE 4" TREE
6" TREE
5" TREE
17" CINNAMOMUM
4" TREE
4" TREE

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT ON

NI KRAP G
ON

NI KRAP G
ON

NI KRAP G
ON

NI KRAP G
VE

GRAHC GNI
YLNO
VE

GRAHC GNI
YLNO
VE

GRAHC GNI
YLNO
VE

GRAHC GNI
YLNO

COMPACT

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT ON

NI KRAP G
ON

NI KRAP G
VE

GRAHC GNI
YLNO

COMPACT COMPACT COMPACT

AP MOC TC AP MOC TC

COMPACT

AP MOC TC AP MOC TC AP MOC TC
EV

CHARGING
ONLY
EV

CHARGING
EV
ONLY

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
24 SPOTS
(11) STANDARD
(13) COMPACT
119 TOTAL SPOTS
(40) STANDARD
(58) COMPACT
(15) EV
(3) VAN ADA
(3) STANDARD ADA

X X X X X X X X X X X X X X X X X X X
X
X X X
X X

X X X X X X X
X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X (7) EV (3) EV
2 SPOTS
(1) STANDARD ADA
(1) VAN ADA
(13) COMPACT
(10) COMPACT
(10) COMPACT
(12) COMPACT
24 SPOTS
(16) STANDARD
(5) EV
(2) STANDARD ADA
(1) VAN ADA
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
(5) COMPACT
X X

X X X X X
121 TOTAL SPOTS
(83) COMPACT
(3) STANDARD
11 SPOTS
(10) STANDARD
(1) VAN ADA

X X X X X X X X X
20' - 8"
1 7' -
7"
241' - 3"
1 8' -
6 "
24' -
7 2
"
4' -
4"
ASS
U
M
E
D
P
RO
P
E
RTY
LIN
E
ASS
U
M
E
D
P
RO
P
E
RTY
LIN
E
1-HR RATING @

EXTERIOR WALL
1-HR RATING @ EXTERIOR WALL

ASSUMED PROPERTY LINES, SEE

LIFE SAFETY FLOOR PLANS ASSUMED PROPERTY LINES, SEE

LIFE SAFETY FLOOR PLANS
70' -
1 1
"

ACCESSIBILITY LEGEND

ACCESSIBLE BUILDING ENTRANCES

ACCESSIBLE BUILDING EXITS

ACCESSIBLE FEATURE

ACCESSIBLE PATH OF TRAVEL

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:53 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt As indicated
G0.22

LIFE SAFETY &

ACCESSIBILITY

SITE PLAN

SCCS EDUCATOR

HOUSING
Author
23132
G0.22 SCALE: 1" = 30'-0"
1 SITE LIFE SAFETY PLAN - LEVEL 1

22.39 LIFE SAFETY AND EXITING LEGEND
AREA

FLOOR AREA PER OCCUPANT

OCCUPANT COUNT
EGRESS

ELEMENT

CLR WIDTH
(INCHES)
WIDTH
FACTOR
EGRESS

CAPACITY
(OCCUPANTS)
ACTUAL

OCCUPANTS
STAIR/DOOR 42" 0 210 60

AREA NAME
150 SF
150 SF/OCC
XX OCC

START POINT OF TRAVEL

ACCUMULATED LOAD AND TRAVEL DIRECTION

OCCUPANT LOAD WITHIN INDIVIDUAL SPACE

AND TRAVEL DISTANCE

EXIT PATH OF TRAVEL
1 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER (HORIZONTAL EXIT)

COMMON PATH OF TRAVEL
X' - X"
X' - X"

FIRE EXTINGUISHER CABINET

EXIT SIGN, SINGLE-SIDED

EXIT SIGN, DOUBLE-SIDED

PATTERN FUNCTION OF SPACE OCCUPANT LOAD FACTOR

ASSEMBLY, UNCONCENTRATED

BUSINESS AREAS
RESIDENTIAL (R-2)

MECHANICAL EQUIPMENT ROOM

STORAGE ROOMS
15 NET
100 GROSS
200 GROSS
300 GROSS
300 GROSS
FEC
0 0
9,514 SF
200 SF/OCC
48 OCC
RES - WEST 1
481 SF
300 SF/OCC
2 OCC
GROUP S-2

TRASH RM
7,489 SF
200 SF/OCC
38 OCC
RES - EAST 1
834 SF
15 SF/OCC
56 OCC
GROUP A-3

COMMUNITY RM
922 SF
150 SF/OCC
7 OCC

GROUP B
LOBBY
10' - 1" 20' - 1 243/256"
104' - 4 23/64" 20' - 1 243/256"
6,234 SF
200 SF/OCC
32 OCC
RES - SOUTH 1
33' - 4 103/128" 20' - 1 243/256"
EXIT ACCESS DISTANCE: 44'-7"
COMMON PATH OF TRAVEL: 26'-2"
26 28
26 12
12 25
16 25
16 28
247 SF
300 SF/OCC
1 OCC

GROUP B

PACKAGE RM
12 1
2 28
449 SF
300 SF/OCC
2 OCC
GROUP S-2

BIKE RM
135 SF
300 SF/OCC
1 OCC

ELEC RM
449 SF
300 SF/OCC
2 OCC
GROUP S-2

ELEC RM
331 SF
300 SF/OCC
2 OCC
GROUP S-2

BIKE RM
146 SF
300 SF/OCC
1 OCC
GROUP S-2
MPOE
50 SF
300 SF/OCC
1 OCC
GROUP S-2
IDF
41 SF
300 SF/OCC
1 OCC
GROUP S-2
JAN
1 1
1 1
1 1
2' - 2 7/8"
3' - 10 1/2"
10' - 1"
10' - 1"
3' - 10 1/2"
20' - 0 1/2" 10' - 1" 7' - 6"
339 SF
150 SF/OCC
3 OCC

GROUP B

LAUNDRY RM

ASSUMED PROPERTY LINE

ASSUMED PROPERTY LINE
11,418 SF
200 SF/OCC
58 OCC
GROUP R-2
RES WEST 2
10,673 SF
200 SF/OCC
54 OCC
GROUP R-2
RES EAST 2
6,567 SF
200 SF/OCC
33 OCC
GROUP R-2
RES SOUTH 2

COMMON PATH
OF TRAVEL: 58'-9"

EXIT ACCESS
DISTANCE: 150'-1"

EXIT ACCESS
DISTANCE: 198'-7"

EXIT ACCESS
DISTANCE: 198'-7"
142 SF
300 SF/OCC
1 OCC
GROUP S-2

TRASH RM
134 SF
300 SF/OCC
1 OCC
GROUP S-2
MECH
58 58
393 SF
15 SF/OCC
27 OCC

GROUP B
LOUNGE
119 SF
300 SF/OCC
1 OCC
GROUP S-2
JAN
30 30
54 SF
300 SF/OCC
1 OCC
GROUP S-2
IDF
88 27
EGRESS

ELEMENT

CLR WIDTH
(INCHES)
WIDTH
FACTOR
EGRESS

CAPACITY
(OCCUPANTS)
ACTUAL

OCCUPANTS
STAIR 1 42" 0.2 210 60
EGRESS

ELEMENT

CLR WIDTH
(INCHES)
WIDTH
FACTOR
EGRESS

CAPACITY
(OCCUPANTS)
ACTUAL

OCCUPANTS
STAIR 3 42" 0.2 210 60
EGRESS

ELEMENT

CLR WIDTH
(INCHES)
WIDTH
FACTOR
EGRESS

CAPACITY
(OCCUPANTS)
ACTUAL

OCCUPANTS
STAIR 2 42" 0.2 210 60
3' - 5 3/4"
9' - 8 1/4"
9' - 8 1/4"
3' - 5 3/4"
16' - 7 3/4" 10' - 1"
16' - 7 3/4"ASSUMED PROPERTY LINE

ASSUMED PROPERTY LINE

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 11:00:09 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/16" = 1'-0"
G0.23

LIFE SAFETY
PLANS

SCCS EDUCATOR

HOUSING
Author
23132
G0.23 SCALE: 1/16" = 1'-0"
1 FIRE LIFE SAFETLY PLAN - LEVEL 1
G0.23 SCALE: 1/16" = 1'-0"
2 FIRE LIFE SAFETY PLAN - LEVEL 2 (LEVELS 3 & 4 SIM.)

22.40 MIN. @ EXTERIOR
DOORS
MIN. @ INTERIOR
DOORS

SURFACE

MOUNTED

TOILET SEAT
COVER

DISPENSER

SURFACE

MOUNTED TRASH

RECEPTACLE

WITH HAND TOWEL

DISPENSER
FULL
LENGTH
MIRROR

MIRROR COAT HOOK
WITH
BUMPER

EXTRA HEAVY DUTY

SHOWER CURTAIN ROD
WITH S.STL SHOWER

CURTAIN HOOKS
S.STL
SHOWER

CURTAIN
HOOKS

SURFACE

MOUNTED
ROBE
HOOK
TOWEL
PIN

REVERSIBLE SOLID

PHENOLIC FOLDING

SHOWER SEAT

SURFACE

MOUNTED

SINGLE ROLL

TOILET TISSUE

DISPENSER

SURFACE

MOUNTED
HAND
DRYER

SURFACE

MOUNTED

TOWEL BARS

SURFACE

MOUNTED

MULTI-ROLL

TOILET TISSUE

DISPENSER

SANITARY
NAPKIN

DISPOSAL

SURFACE

MOUNTED

MULTI-ROLL
TOILET
TISSUE

DISPENSER

RECESSED NOT USED

SINGLE ROLL
TOILET
TISSUE

DISPENSER
CORNER
SOAP
DISH

FOLDING BATHTUB
SEAT

SURFACE

MOUNTED SOAP

DISPENSER

CLEAR MANEUVERING
SPACE
PULL
SIDE
PUSH
SIDE

HINGE APPROACH

PROVIDE THIS

ADDITIONAL SPACE
IF

DOOR IS EQUIPPED

WITH BOTH A LATCH

AND A CLOSER
PUSH
SIDE

FRONT APPROACH
PULL
SIDE
PULL
SIDE
PUSH
SIDE

LATCH APPROACH

PERPENDICULAR APPROACH PARALLEL APPROACH

REQUIRED LEVEL MANEUVERING

CLEARANCE AT DOORS

TOP OF FINISH
FLOOR

TYPICAL INTERIOR

SIGNAGE AND FIXTURES

ELEVATOR

DOOR JAMB

SIGN W/FLOOR
NUMBER

HALL CALL
BUTTON
(ELEVATOR)
TOP OF F.E.

HANDLE
FIRE

EXTINGUISHER

CABINET
HALL

LANTERN
(ELEVATOR)

FIRE ALARM DEVICES

ACCESSIBLE ROLL IN SHOWER - ELEVATIONS

ACCESSIBLE TOILET - WALL MOUNTED
TYP. ACCESSIBLE

TOILET SEAT HEIGHT

ACCESSORIES

TOP OF FINISH FLOOR
CONT. LONG L-SHAPED

GRAB BAR, EXTEND AROUND

SHOWER TO FOLD DOWN

SEAT, PROVIDE BACKING
FOR 250# PT. LOAD

SEE GRAB
BAR

ACCESSORIES
SEE
TOILET

PAPER - SEE
PANEL
BOARDS

PROJECTING

WALL OR
COLUMN

MOUNTED

OBJECTS

LIGHT SWITCH,

OR HIGH

ACCESSIBLE

CONVENIENCE
OUTLET

EXIT SIGNS AT

DOORWAYS (CEILING

MOUNTED OR WALL

MOUNTED)
EXIT
1" MIN. CONT.

PHOTOLUMINESCENT

GUIDE STRIP

MOUNTED ON DOOR
FRAME
EXIT
DOOR

IDENTIFICATION

SYMBOL REFER TO

SIGNAGE DRAWINGS

SIDE ELEVATION

LAVATORY, VANITY & MIRROR (MULTIPLE)

SIDE ELEVATION FRONT ELEVATION
WRAP
PIPES.P.D.

WRAP
PIPES.P.D.

VANITY & MIRROR (SINGLE)

FRONT ELEVATION
WRAP
PIPES.P.D.

AUDIBLE NOTIFICATION

APPLIANCE, LOCATE NOT
LESS THAN 6" BELOW

CEILING
ALIGN
30" X 60" MIN. ACCESSIBLE ROLL IN NON-ACCESSIBLE TUB

SHOWER - PLAN
42" MIN.

GRAB BAR -
SEE
36" MIN.

GRAB

BAR - SEE
FLUSH

ACTIVATOR

ON WIDE SIDE

ACCESSIBLE TOILET COMPARTMENT
(SIDE OPENING INSWING DOOR) - PLAN

ALL DISPENSERS

EXCEPT TOILET

PAPER DISPENSERS
40" MAX. TO HIGHEST

OPERABLE PART

SIDE ELEVATION FRONT ELEVATION

LAVATORY & MIRROR (SINGLE)

SIDE ELEVATION FRONT ELEVATION

ACCESSIBLE TOILET - FLOOR

MOUNTED TANK TOILET
OF
DOOR
U.O.N.

SHARED CLOSETS

AND DESIGNATED

ACCESSIBLE

CLOSETS CLOTHES
ROD + SHELVES

BACK HEAD

ACCESSIBLE PLUMBING FIXTURES

ACCESSIBLE TUB WITH SEAT IN TUB

PERPENDICULAR

APPROACH

ELECTRICAL
RECEPTACLE +

TELECOM OUTLET
FOOT

CONTROL
AREA

FOLDING
SHOWER

SEAT - SEE U
4" MAX. PROJECTION

AUDIBLE/VISIBLE NOTIFICATION

APPLIANCE, LOCATE NOT LESS
THAN 90" TO TOP OF DEVICE AND
NOT LESS THAN 6" BELOW CEILING

RECESSED SOAP DISH

WITHIN SEAT REACH
AREA; SHELF AT 3'-4", W.O.

FOLDING SHOWER

SEAT - SEE U

STANDARD NON-ACCESSIBLE

STANDARD ACCESSIBLE
1:48 MAX.

GRAB BAR GRAB BAR CONTINUOUS

L-SHAPED

GRAB BAR
PLAN

GRAB BAR GRAB BAR GRAB BARS
RESTS ON RIM OF BATHTUB 17" MIN,
19" MAX ABOVE BATHROOM FLOOR
2' - 8"
16" MAX
15" MIN

ACCESSIBLE URINAL

FRONT ELEVATION
X=36" : MIN. CLR. @ RECESS MORE THAN 24" DEEP, CENTERED

ON FIXTURE
X=30" @ RECESS LESS THAN 24" DEEP, CENTERED ON

FIXTURE

SIDE ELEVATION
CARD
READER

OF OPERABLE PARTS OF SPRAYER
UNIT AND CONTROLS: 19" MIN, 27"

MAX FROM SEAT WALL

THERMOSTAT

CERAMIC

ACCESSORIES
13 1/2" MIN.

FOOT
GREATER THAN 4"
CLR.
60" MIN.
34" MIN CLR
36" MIN DOOR
CLR.
60" MIN.
1'-6" MAX.
1'-5" MIN.
60" MIN.

FLEXIBLE HOSE
3'-4" CONTROLS
(3'-3" CODE MIN.,
3'-5" CODE MAX.)

NON-ACCESSIBLE SECOND

SHOWER HEAD,

W/DIVERTER IN CONTROL
AREA. ONLY ONE SHOWER

HEAD TO BE ON AT ANY ONE
TIME

PARALLEL

APPROACH
1/4" MAXIMUM
OPENING @ DRAIN
GRATE
60" MIN. F.O.F.
1:48 MAX. SLOPE
30" MIN. SHOWER FLOOR
THRESHOLD: 1/4" MAX. VERTICAL,
1/2" MAX. W/ 1/4" MAX. VERTICAL
AND THE REST BEVELED @ 1
VERTICAL TO 2 HORIZONTAL

CLEAR FLOOR SPACE
60" MIN.

CLEAR FLOOR SPACE
36" MIN
MIN. 60"X60"

MANEUVERING
SPACE
6' - 7"

FIRE VALVE CABINET
1' - 6" 3' - 0"
6' - 0"
MIN.
1' - 6"

TO BOTTOM
1' - 6" MIN.
3' - 0" TYP.
1' - 0" MIN.

SEE J
3' - 0" MIN. 6" MAX.
18" MAX.
17" MIN.

MAX.
1' - 0"
SEE K
3' - 6" MIN.
54" MIN.
30" MIN. CLR.
40" MAX. TO

SURFACE AT COUNTER OR LAV
40" MAX. TO REFLECTIVE

W/SPLASH
COORDINATE 3' - 0"
8"
4' - 0"
5' - 6"
90" MIN
6' - 8"
4' - 0" MAX
BARTYPE DOOR
ACTUATOR 35" MIN 5" MAX.
(ATYPICAL

HEIGHT AS

INDICATED IN

ELEVATIONS)
6' - 0"

TOP OF FVC
HANDLE
40" MAX. TO
PAPER
TOWEL

DISPENSER

TELECOM/DATA
RECEPTACLE +

CABLE OUTLET
TYP.
6"
(ATYPICAL

HEIGHT AS

INDICATED IN

ELEVATIONS)

WALL MOUNTED TV

OR MONITOR
6' - 0 1/2"

SHOWER CURTAIN
ROD, SEE 40" MAX.
96" MAX TO TOP OF LENS
TO THE

ACTIVATIN

G HANDLE

OR LEVER
OF THE
BOX
19" MIN
19" MIN
7"-9" IN FRONTOF TOILET
19" MIN
. .
.

CL
3' - 0"
33" MIN
36" MAX
3' - 6" 12" MIN. 24" MIN. 24" MIN.

T1 = 60" MIN.

T = 36" +/-
6'-8" MIN CLR UON
5' - 6" TYP.
5' - 6"
2' - 6"
CL
CL
CL
CL
CL
CL
CL
CL CL
CL
CL
CL

A B C D E F G H J K L M N P Q R T X
U

S V W Y AA
T1
BB CC FF 4'-0" BASE OF

TOP OF SEAT
17"-19"
18" MAX.
17" MIN.

SEE J
3'-0" MIN. 6" MAX.

MIN.
1' - 0"
7"-9" MAX.
54" MIN.

MAX.
1' - 0"
SEE K
3'-6" MIN. 1 1/2" CLR.
.

CL
17" MAX
X

OPERABLE PART
44" MAX TO

OPERABLE PART
44" MAX TO
2'-10" MAX.

TO RETURN
1' - 6" MIN.

CLR.
30" MIN.
33" - 36"
. 33" - 36" 2'-10" MAX. TO T.O. CNTR. OR RIM OF SINK, WHICHEVER IS HIGHER 2'-10" MAX. TO T.O. CNTR. OR RIM

OF SINK, WHICHEVER IS HIGHER
EQ EQ
2' - 8"
1' - 8"
6' - 4"
4' - 0"
2' - 5"

RECESSED

SOAP DISH
9"
12" MAX. 24" MAX.
48" MIN.
30" MIN.
60" MIN.

PERMANENT FOLD-DOWN

SHOWER SEAT - SEE
3' - 6"
5' - 0"
48" MAX.
48" MAX.
6' - 8" MIN.
6' - 6"

TOP OF BOX
4' - 0" TO
4' - 0" TYP. TO

TOP OF BOX
58" - 60"
4'-0" MIN. 5'-0" MIN.
1' - 0"
1' - 6"
2'-0" .
3'-8" MIN. 5'-0" MIN.
2'-0" MIN.

MIN.
3' - 0"
5'-0" MIN. 3'-8" MIN.
7" MIN - 9" MAX.

CL CL
CL
TOP OF DISPENSER NOT LESS THAN 1 1/2" BELOW GRAB BAR
7"-9" IN FRONTOF TOILET
7"-9" IN FRONTOF TOILET
7"-9" IN FRONTOF TOILET

TOP OF ACCESSIBLE

DISPENSER NOT LESS THAN
1 1/2" BELOW GRAB BAR
60" MIN.

GG
40" MAX. TO

WALL MOUNTED
SOAP

DISPENSER
40" MAX.

ROOM
SCHEDULER 4' - 0" TYP. TO TOP OF BOX
4' - 0" TYP. TO

TOP OF BOX

LIGHTING

AND SHADE

CONTROL
36" TYP.

CL
3"
96" TYP. TO TOP OF DEVICE

END OF DOOR, DOOR

IN OPEN POSITION,

OR SIDELITE JAMB

WHERE OCCURS
U.O.N.
3"

END OF DOOR

IN OPEN

POSITION OR

SIDELITE

JAMB WHERE
OCCURS
3"

DUAL-SIDED
CLOCK
7' - 6" TYP.

CL
WALL

MOUNTED
SMOKE
DETECTOR 1' - 0" TYP.

LOCATE NOT LESS
THAN 4" OR
GREATER THAN 12"

BELOW CEILING

FROM TOP OF
DEVICE (WITHIN 36"

HORIZONTALLY OF

PEAK OF CEILING)
WALL
CLOCK
CL
6' - 6" TYP.
3"
ALERT

BEACON TO TOP OF BOX
4' - 0" TYP.
3"

END OF DOOR, DOOR

IN OPEN POSITION,

OR SIDELITE JAMB

WHERE OCCURS
U.O.N.

GUIDE STRIP
CBC 1024.4/5 &
1011.5
EQ. EQ.
1' - 0" 5' - 0"
1' - 2"
40" MAX.

CL
CL
CLR. MIN
1 1/2"

TOP OF BAR
MIN. CLR.
1 1/2"
19" MIN
42" MIN.

GRAB BAR -
SEE
36" MIN.

GRAB BAR -
SEE
FLUSH

ACTIVATOR

ON WIDE SIDE

ACCESSIBLE TOILET COMPARTMENT
(END OPENING INSWING DOOR) - PLAN
CLR.
60" MIN.

CLR.
60" MIN.
1'-6" MAX.
1'-5" MIN.

MIN. 60"X60"

MANEUVERING SPACE
CL
32" MIN CLR
34" MIN DOOR
CLR.
1 1/2" MIN
19" MIN

TO RETURN
1' - 6" MIN CL

TACTILE AND OTHER

EXIT SIGNAGE ON
LATCH SIDE: REFER TO

SIGNAGE DRAWINGS

TOILET ROOM

SIGN ON DOOR
MIN.
22"

PERMANENT FOLD-DOWN

SHOWER SEAT - SEE
GRAB

BAR - SEE
GRAB

BAR - SEE
22" MIN
23" MAX
14" MIN
15" MAX

FOLDING

SHOWER SEAT -
SEE U

OF SHOWER FLOOR
3" MAX. SEAT TO EDGE 2 1/2" MAX.

SEAT TO WALL
1 1/2" MAX.
19" MIN.
27" MAX.
1:48 MAX. SLOPE ANY
DIRECTION, TYP. IN ACCESSIBLE

SHOWER FLOOR
1 1/2" MIN.

PULL SIDE
18" MIN.
59" MIN. CLR. @ FLOOR-MTD. W.C. WHEN DOOR SWINGS IN
56" MIN. CLR. AT WALL-MOUNTED W.C. WHEN DOOR SWINGS IN
36" MIN WHEN DOOR

SWINGS IN
TOE CLEARANCE, 6" DEEP BY 9" HIGH MINIMUM, AT EITHER LONG SIDE OF ACCESSIBLE STALLS THAT ARE LESS THAN 66" WIDE.

PARTITION SUPPORTS MAY INTERRUPT THE TOE CLEARANCE

SANITARY NAPKIN

DISPOSAL - SEE
2' - 0" MIN.

DISPENSER,
NONACCESSIBLE
MINIMUM CLEARANCES FOR APPROACH. ACCESSIBLE

LAVATORY IS ALLOWED IN THE CLEARANCE NEXT TO
THE CONTROL END OF THE TUB.

CL
47" MAX. TO T.O.

ACCESSIBLE HOOK
47" MAX. TO T.O.

ACCESSIBLE

ACCESSIBLE HOOK

OPERABLE
NONPART ACCESSIBLE

TO DISPENSER

OUTLET AND

OPERABLE PARTS

TO OUTLET OF THE

DISPENSER AT

ACCESSIBLE

LOCATIONS
33" MIN
36" MAX
CLR. MIN
1 1/2"
CLR. MIN
1 1/2"
35" MIN.
37" MAX.
60" MIN.
44" MIN.

AMBULATORY ACCESSIBLE TOILET
CL
7" MIN.
8" MAX.

CL
30" MIN.
44" MAX.
1 1/2" TYP.

MIRROR - SEE
4' MIN. IF DOOR

HAS BOTH

LATCH AND
CLOSER
4' MIN. IF DOOR

HAS BOTH

LATCH AND
CLOSER
BUTTONTYPE DOOR

ACTUATOR
OUTLET
AND TO

OPERABLE

PARTS OF

DISPENSER
OUTLET
AND TO

OPERABLE

PARTS OF

DISPENSER
OUTLET
AND TO

OPERABLE

PARTS OF

DISPENSER
35" MAX
WHERE
NOT AT

COUNTER
OR LAV
25" MAX.
19" MIN.

ACCESSIBLE DINING &

WORK SURFACES

ACCESSIBLE LAVATORIES
NOTE REGARDING SLOPED OR UNEVEN FLOORS: CLEAR HEIGHTS ARE MEASURED TO THE WORST CONDITION, NOT NECESSARILY AT THE WALL. EXCEPTION: PER CBC 11B-606.2 EXCEPTION 6, THE DIP OF THE OVERFLOW SHALL NOT BE CONSIDERED IN DETERMINING KNEE AND TOE CLEARANCES. 27" MIN. 27" MIN.

FOR CLEARANCES -

SEE TOE & KNEE

CLEARANCE

FOR CLEARANCES -

SEE TOE & KNEE

CLEARANCE

FOR CLEARANCES - SEE

TOE & KNEE

CLEARANCE

FOR DIMENSIONS SEE -
30" X 60" MIN.

ACCESSIBLE ROLL IN

SHOWER - PLAN

ABOVE SHOWER RM FLOOR
17" MIN, 19" MAX

ACCESSIBLE

OPERABLE
PART

NON-ACCESSIBLE SHOWER
TOP OF FINISH FLOOR 6' - 7"
6' - 7"
4' - 0"
9" MIN. TOE CLR.
29" MIN.
6" MAX.
11" MIN.
27" MIN.

OTHER ACCESSIBLE

SURFACES
9" MIN. TOE CLR.
8" MIN.
11" MIN.
25" MAX
17" MIN.
27" MIN.

ACCESSIBLE SINKS
6" MAX.
11" MIN.
25" MAX
19" MIN.
8" MIN.

TOE & KNEE CLEARANCE
SCALE: 1/2" = 1' - 0"
KNEE & TOE CLEARANCE SHALL BE 30" WIDE MIN.
19" MAX.
17" MIN.
6" MAX.
9" MIN. TOE CLR.

DRINKING FOUNTAIN - ALCOVE

FRONT ELEVATION SIDE ELEVATION
5" MAX. FROM OF

BUBBLER OUTLET

TO FRONT EDGE
OF D.F.
@ RECESSES UP
TO 24" DEEP
@ AT WHEELCHAIRACCESSIBLE LOW DF
@ RECESSES MORE
THAN 24" DEEP
CL CL
18" MIN.
15" MIN.

D.F.: 18" MIN, 19" MAX
.
32" MIN. CLR. AT RECESSES
OF D.F., MIN

MATCH DEPTH
15" MIN
38" MIN 43" MAX
UP TO 24" DEEP; 36" MIN.

CLR. AT RECESSES
MORE THAN 24" DEEP

FOR CLEARANCES - SEE

TOE & KNEE

CLEARANCE
8" MIN. MIRROR - SEE

MIRROR - SEE

ACCESSORIES

TO OUTLET OF THE DISPENSER

AT ACCESSIBLE LOCATIONS

ACCESSIBLE PLUMBING FIXTURES
36" MIN WHEN

DOOR SWINGS
IN

ACCESSIBLE PLUMBING FIXTURES
C
R
N
M
V
R
R

DOOR HEADER
6" TOP OF
EXIT
DOOR
19" MIN
.

CL
18" MIN
16" MIN
@ RECESSES
UP TO 24" DEEP @

RECESSES

MORE THAN
24" DEEP

STANDING

TACTILE SIGN
9" TO CL OF

TACTILE SIGN
9" TO CL OF
G
V
K
J
K
J
J K

BUBBLER FOR
STANDING D.F.
36" MAX. TO

WHEELCHAIR

ACCESSIBLE

BUBBLER
4'-0" MAX.

SPRAYER UNIT

MOUNTING

BRACKET
2 19" MIN

PROVIDE THIS
ADDITIONAL 30"x48"

SPACE IF DOOR IS

EQUIPPED WITH

ACTUATORS

PROVIDE THIS
ADDITIONAL 30"x48"

SPACE IF DOOR IS

EQUIPPED WITH

ACTUATORS
24" MIN FOR SIDE APPROACH
15" MIN FOR FRONT APPROACH OR OTHER TOP SURFACE 34" MAX TO TOP OF ACCESSIBLE COUNTER 1 1/2" MIN CLR TO GRAB BAR

DISPOSAL TO BE

ADJACENT TO TP

DISPENSER, BETWEEN TP AND REAR WALL
17" MIN, 19" MAX
1 1/2" MIN CLR
34" MIN DOOR,
32" MIN CLR
24" MAX

ADJUSTABLE HEIGHT

SHOWER SPRAY UNIT W/
59" MIN HOSE
T1
U.O.N. U.O.N.

NOTE: WHERE BOTH (1)

TACTILE MESSAGES ARE

NOT CENTERED ON THE
SIGN AND (2) THE DOOR

SWINGS TOWARDS THE
PERSON AT THE SIGN, 9"

MIN FROM THE DOOR EDGE

TO THE CENTER OF EVERY

TACTILE LINE OF TEXT OR

BRAILLE

REDUCTION OF ACCESSIBLE

HEIGHTS AT
OBSTRUCTIONS: 44" HIGH

MAX AT OBSTRUCTED HIGH

FORWARD REACH (WALL
BEHIND A COUNTER 20"-25"
DEEP, W/ KNEESPACE); 46"

HIGH MAX AT OBSTRUCTED

HIGH SIDE REACH (WALL
BEHIND A COUNTER 10"-24"
DEEP AND 34" MAX HIGH

W/O KNEESPACE)

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 11:00:11 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/4" = 1'-0"
G0.31

ACCESSIBLE

MOUNTING

HEIGHTS

SCCS EDUCATOR

HOUSING
Author
23132

22.41 1 BR-MOB
147

EXTERIOR CORREDOR

BREEZEWAY

BREEZEWAY

STU-MOB
149

EXTERIOR CORRIDOR
1 BR - (1B)
113
2 BR - (2A.1)
115

ELEVATED WALKWAY BRIDGE

EXTERIOR CORRIDOR

ELEVATED

WALKWAY
BRIDGE

EXTERIOR CORREDOR
2 BR-MOB
202
2 BR-MOB
204
ELEV
E1-2
3 BR-MOB
245

MOBILITY UNIT DISPERSION PLAN LEGEND

ACCESSIBLE UNIT ENTRANCES

MOBILITY UNIT

ACCESSIBLE PATH OF TRAVEL

MOBILITY UNIT DISPERSION PLAN NOTES

1. PER 2022 CBC 11B-233.3.1.1, MOBILITY UNITS ARE TO BE 5% OF UNIT TOTAL:

BUILDING UNIT TOTAL: 100 UNITS
REQUIRED MOBILITY UNITS: 5 UNITS
MOBILITY UNIT MIX: 1 STUDIO
1 1-BR
2 2-BR
1 3-BR

2. PER 2022 CBC 11B-233.3.1.2.1, IN AN ELEVATOR BUILDING, ALL OTHER UNITS ARE TO BE ADAPTABLE.

3. PER 2022 CBC 11B-233.3.1.3, COMMUNICATION FEATURE UNITS ARE TO BE 2% OF THE UNIT TOTAL:

BUILDING UNIT TOTAL: 100 UNITS
REQUIRED COMMUNICATION UNITS: 2 UNITS
COMMUNICATION UNIT MIX: 1 1-BR
1 2-BR

4. ALL COMMUNICATIONS UNITS ARE TO COMPLY WITH 2022 CBC 11B-809.5.

5. ALL UNITS, BOTH MOBILITY AND ADAPTABLE, HAVE THEIR PRIMARY ENTRIES OFF OF THE BUILDING CORRIDOR.

6. ALL PATIO DOORS SERVING MOBILITY UNITS SHALL COMPLY WITH 2022 CBC 11B-303.

7. ALL PATIO DOORS SERVING ADAPTABLE UNITS SHALL COMPLY WITH 2022 CBC 11B-809.8.

COMMUNICATION UNIT

LOCATION OF MOBILITY OR COMMUNICATION UNIT

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 11:00:16 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/16" = 1'-0"
G0.32

MOBILITY UNIT

DISPERSION
PLANS

SCCS EDUCATOR

HOUSING
Author
23132
G0.32 SCALE: 1/16" = 1'-0" 1 LEVEL 1 - MOBILITY UNIT DISPERSION PLAN G0.32 SCALE: 1/16" = 1'-0" 2 LEVEL 2 - MOBILITY UNIT DISPERSION PLAN

22.42 (7) WASHERS & (7) DRYERS

PROVIDED AT LAUNDRY
ROOM

DRINKING FOUNTAIN
(HIGH/LOW) + BOTTLE FILLING

STATION

SINGLE-OCC ADA

RESTROOM
1,091 SF
B
LOBBY
870 SF
A-3

COMMUNITY
RM
NOTE: SEE GENERAL NOTE #1 ABOVE

FOR PLUMBING FIXTURES AT ALL
RESIDENTIAL FLOORS (LEVELS 2, 3, & 4)

PLUMBING CALCULATION NOTES

1. APARTMENTS REQUIRE (1) W.C., (1) LAVATORY, (1) SHOWER & (1) KITCHEN SINK PER CPC 2022 TABLE 422.1. THIS APPLIES TO ALL APARTMENTS, SEE PLANS FOR QUANTITY OF FIXTURES PROVIDED AT EACH RESIDENTIAL UNIT TYPE.

2. ALL APARTMENT UNITS EXCEPT STUDIO APARTMENTS ARE PROVIDED WITH 1 AUTOMATIC CLOTHES WASHER CONNECTION ("WASHER/DRYER-READY"), PER CPC TABLE 422.1.

3. LAUNDRY MACHINES FOR STUDIO APARTMENTS ARE PROVIDED AT LEVEL 1 LAUNDRY ROOM. PER XXX, (1) WASHER & (1) DRYER REQUIRED FOR EVERY 10 UNITS (1:12 RATIO, PER CPC TABLE 422.1). PER CBC 11B-214, (2) WASHERS & (2) DRYERS WITHIN EACH LAUNDRY ROOM SHALL COMPLY WITH 11B-611.

TOTAL STUDIO APARTMENTS: 11
LAUNDRY SERVICE, REQUIRED (11 X 1/12): (1) WASHERS + (1) DRYERS REQUIRED LAUNDRY SERVICE, PROVIDED: SEE LEVEL 1 FLOOR PLAN
PLUMBING CALCULATIONS (LEVEL 1)
NOTE: (1) SINGLE-OCCUPANT ACCESSIBLE RESTROOM PROVIDED AT LEVEL 1 NONAPARTMENT RESTROOM FIXTURE LOAD AT LEVEL 1.

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 11:00:20 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt As indicated
G0.41

PLUMBING

CALCULATIONS

SCCS EDUCATOR

HOUSING
Author
23132
G0.41 SCALE: 1/32" = 1'-0"
1 PLUMBING COUNT PLAN - LEVEL 1
G0.41 SCALE: 1/32" = 1'-0"
2 PLUMBING COUNT PLAN - LEVEL 2 (LEVELS 3 & 4 SIM.)

22.43 SAN FRANCISCO MUSEUM OF MODERN
ART
151 THIRD STREET

SAN FRANCISCO
CALIFORNIA 94103
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% CONSTRUCTION DOCUMENTS 10.07.2015

ARCHITECTURE

INTERIORS

PLANNING URBAN DESIGN
PIER 1 THE
EMBARCADERO, BAY 2

SAN FRANCISCO
CALIFORNIA 94111
[email protected]
T 415-285-9193
F 415-285-3866
Revisions and Description Date
100% CONSTRUCTION DOCUMENTS 10.07.2015
10/31/2024 11:00:21 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 12" = 1'-0"
G1.01

SURVEY - FOR

REFERENCE ONLY
SCCS

EDUCATOR

HOUSING
Author
23132
SCALE: 12" = 1'-0"

SITE SURVEY (EAST) - FOR REFERENCE ONLY

22.44 SAN FRANCISCO MUSEUM OF MODERN
ART
151 THIRD STREET

SAN FRANCISCO
CALIFORNIA 94103
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% CONSTRUCTION DOCUMENTS 10.07.2015

ARCHITECTURE

INTERIORS

PLANNING URBAN DESIGN
PIER 1 THE
EMBARCADERO, BAY 2

SAN FRANCISCO
CALIFORNIA 94111
[email protected]
T 415-285-9193
F 415-285-3866
Revisions and Description Date
100% CONSTRUCTION DOCUMENTS 10.07.2015
10/31/2024 11:00:21 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 12" = 1'-0"
G1.02

SURVEY - FOR

REFERENCE ONLY
SCCS

EDUCATOR

HOUSING
Author
23132
SCALE: 12" = 1'-0"

SITE SURVEY (WEST) - FOR REFERENCE ONLY

22.45 SAN FRANCISCO MUSEUM OF MODERN
ART
151 THIRD STREET

SAN FRANCISCO
CALIFORNIA 94103
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% CONSTRUCTION DOCUMENTS 10.07.2015

ARCHITECTURE

INTERIORS

PLANNING URBAN DESIGN
PIER 1 THE
EMBARCADERO, BAY 2

SAN FRANCISCO
CALIFORNIA 94111
[email protected]
T 415-285-9193
F 415-285-3866
Revisions and Description Date
100% CONSTRUCTION DOCUMENTS 10.07.2015
10/31/2024 11:00:21 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 12" = 1'-0"
G1.03

SURVEY - FOR

REFERENCE ONLY
SCCS

EDUCATOR

HOUSING
Author
23132
SCALE: 12" = 1'-0"

SITE SURVEY (PENDING EASEMENT) - FOR REFERENCE ONLY

22.46 X X X
X X X
V
V
V
V
V
V
V
V
V V V

X X X X X X X X X X X X
X X

X X X X X X X X X
X X

X X X X X X X X X
X

X X X X
X
X
X
X
X
X
X
X

X X X X X X X X
X
X
X

X X X X X X X
X X
X
X
X
X
X
X
X
X
V
V
V
V
X

X X X X X X X X X

X X X X X X X X X X X X X X X X X X
X X
X X

X X X X
X
X
X
X
X

X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X
X X
X
X
X
X
X
X
X
X

X X X X
X
X
X

X X X X
X
X X

X X X X
X
X
X F:\23132 Santa Cruz Educator Housing\MILESTONES\240315_50SD\Titleblock\TB-30x42-EHDD-EHDDBlack+White-952547.jpg PROJECT ADDRESS 313 SWIFT ST SANTA CRUZ, CA 95060 SCCS Educator Housing Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date 100% SCHEMATIC DESIGN 06.14.2024 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 [email protected] +1 415-285-9193 Revisions and Description Date 1509 SEABRIGHT AVENUE, SUITE A2 SANTA CRUZ, CA 95062 TEL (831) 426-5313 www.iflandengineers.com 100% SCHEMATIC DESIGN 08.28.2024 1 PER CITY COMMENTS 08.28.2024 C0.0 SCHEMATIC DEMOLITION PLAN 22.47 X X X
X X X
V
V
V
V
V
V
V
V
V
V V

X X X X X X X X X X X X
X X

X X X X X X X X X

X X X X X X X X X X X
X

X X X X
X
X
X
X
X
X
X
X

X X X X X X X X
X
X
X

X X X X X X X
X X
X
X
X
X
X
X
X
X
V
V
V
V
X

X X X X X X X X X

X X X X X X X X X X X X X X X X X X
X X
X X

X X X X
X
X
X
X
X

X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X
X X
X
X
X
X
X
X
X
X

X X X X
X
X
X

X X X X
X
X X

X X X X
X
X
X F:\23132 Santa Cruz Educator Housing\MILESTONES\240315_50SD\Titleblock\TB-30x42-EHDD-EHDDBlack+White-952547.jpg PROJECT ADDRESS 313 SWIFT ST SANTA CRUZ, CA 95060 SCCS Educator Housing Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date 100% SCHEMATIC DESIGN 06.14.2024 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 [email protected] +1 415-285-9193 Revisions and Description Date 1509 SEABRIGHT AVENUE, SUITE A2 SANTA CRUZ, CA 95062 TEL (831) 426-5313 www.iflandengineers.com 100% SCHEMATIC DESIGN 08.28.2024 1 PER CITY COMMENTS 08.28.2024 C1.0 SCHEMATIC GRADING AND DRAINAGE PLAN 22.48 X X X
X X X
V
V
V
V
V
V
V
V
V
V V

X X X X X X X X X X X X
X X

X X X X X X X X X X X X X X X X X X X X
X
V
V
V
V

X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X
X X

X X X X
X
X
X

X X X X
X
X X

X X X X
X
X
X F:\23132 Santa Cruz Educator Housing\MILESTONES\240315_50SD\Titleblock\TB-30x42-EHDD-EHDDBlack+White-952547.jpg PROJECT ADDRESS 313 SWIFT ST SANTA CRUZ, CA 95060 SCCS Educator Housing Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date 100% SCHEMATIC DESIGN 06.14.2024 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 [email protected] +1 415-285-9193 Revisions and Description Date 1509 SEABRIGHT AVENUE, SUITE A2 SANTA CRUZ, CA 95062 TEL (831) 426-5313 www.iflandengineers.com 100% SCHEMATIC DESIGN 08.28.2024 1 PER CITY COMMENTS 08.28.2024 C2.0 SCHEMATIC UTILITY PLAN 22.49 X X X
X X X
V
V
V
V
V
V
V
V
V V V

X X X X X X X X X X X X
X X

X X X X X X X X X
X X

X X X X X X X X X
X
V
V
V
V

X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X
X X

X X X X
X
X
X

X X X X
X
X X

X X X X
X
X
X F:\23132 Santa Cruz Educator Housing\MILESTONES\240315_50SD\Titleblock\TB-30x42-EHDD-EHDDBlack+White-952547.jpg PROJECT ADDRESS 313 SWIFT ST SANTA CRUZ, CA 95060 SCCS Educator Housing Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date 100% SCHEMATIC DESIGN 06.14.2024 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 [email protected] +1 415-285-9193 Revisions and Description Date 1509 SEABRIGHT AVENUE, SUITE A2 SANTA CRUZ, CA 95062 TEL (831) 426-5313 www.iflandengineers.com 100% SCHEMATIC DESIGN 08.28.2024 1 PER CITY COMMENTS 08.28.2024 C3.0 SCHEMATIC STORMWATER CONTROL PLAN 22.50 F:\23132 Santa Cruz Educator Housing\MILESTONES\240315_50SD\Titleblock\TB-30x42-EHDD-EHDDBlack+White-952547.jpg PROJECT ADDRESS 313 SWIFT ST SANTA CRUZ, CA 95060 SCCS Educator Housing Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date 100% SCHEMATIC DESIGN 06.14.2024 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 [email protected] +1 415-285-9193 Revisions and Description Date 1509 SEABRIGHT AVENUE, SUITE A2 SANTA CRUZ, CA 95062 TEL (831) 426-5313 www.iflandengineers.com 100% SCHEMATIC DESIGN 08.28.2024 1 PER CITY COMMENTS 08.28.2024 C3.1 SCHEMATIC STORMWATER CONTROL CALCULATIONS 22.51 X X X
X X X
V
V
V
V
V
V
V
V
V V V

X X X X X X X X X X X X
X X

X X X X X X X X X
X X

X X X X X X X X X
X

X X X X
X
X
X
X
X
X
X
X

X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
V
V
V
V
X

X X X X X X X X X

X X X X X X X X X X X X X X X X X X
X X
X X
X X X
X
X
X
X
X
X

X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X
X X
X
X
X
X
X
X
X
X

X X X X
X
X
X

X X X X
X
X X

X X X X
X
X
X F:\23132 Santa Cruz Educator Housing\MILESTONES\240315_50SD\Titleblock\TB-30x42-EHDD-EHDDBlack+White-952547.jpg PROJECT ADDRESS 313 SWIFT ST SANTA CRUZ, CA 95060 SCCS Educator Housing Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date 100% SCHEMATIC DESIGN 06.14.2024 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 [email protected] +1 415-285-9193 Revisions and Description Date 1509 SEABRIGHT AVENUE, SUITE A2 SANTA CRUZ, CA 95062 TEL (831) 426-5313 www.iflandengineers.com 100% SCHEMATIC DESIGN 08.28.2024 1 PER CITY COMMENTS 08.28.2024 C4.0 SCHEMATIC FIRE ACCESS PLAN 22.52 X X X X X X X X X X X X X X X X V V V V X X X X X X X X X X X X X X PROJECT ADDRESS 313 SWIFT ST SANTA CRUZ, CA 95060 SCCS Educator Housing NW23132 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date 100% SCHEMATIC DESIGN 06.14.2024 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 [email protected] +1 415-285-9193 Revisions and Description Date 515 SWIFT ST. SANTA CRUZ CA 95060 PHONE 831.423.6040 | WWW.JLJA.COM California Landscape Architect License 3163 SCALE: 1"=20'-0" 0 10' 20' 40' 1" = 20'-0" TPZ1.00 TREE REMOVAL & PROTECTION PLAN TREE PROTECTION AND REMOVAL NOTES 1. THE PROJECT ARBORIST MUST ATTEND A PRE-CONSTRUCTION MEETING WITH THE GENERAL CONTRACTOR AND THE GRADING CONTRACTOR BEFORE ANY SITE WORK PROCEEDS IN ORDER TO DISCUSS TREE PROTECTION REQUIREMENTS. THE PROJECT ARBORIST MUST ALSO BE NOTIFIED CONCERNING SCHEDULED SITE MEETINGS THROUGHOUT THE CONSTRUCTION PERIOD. 2. TREE PROTECTION ZONE FENCING MUST BE INSTALLED AND APPROVED BY THE PROJECT ARBORIST BEFORE ANY EQUIPMENT COMES ON SITE AND ANY SITE WORK PROCEEDS. 3. THE PROJECT ARBORIST MUST PROVIDE SUPERVISION AND OVERSIGHT IN THE EVENT THAT ANY GRADING, EXCAVATION, OR TRENCHING WORK WILL ENCROACH WITHIN THE TREE PROTECTION ZONES DEFINED BY TPZ FENCES. THE PROJECT ARBORIST MUST PROVIDE DIRECTION AND SUPERVISION CONCERNING REQUIRED ROOT PRESERVATION AND ROOT PRUNING MEASURES. 4. THE PROJECT ARBORIST MUST PROVIDE SUPERVISION AND OVERSIGHT CONCERNING ALL CONSTRUCTION DISTURBANCES THAT ENCROACH WITHIN THE CRITICAL ROOT ZONES AREAS OF PROTECTED TREES (AS DEFINED BY THEIR CANOPY DRIP LINE PERIMETERS OR THEIR TRUNK DIAMETER MEASUREMENTS). 5. THE PROJECT ARBORIST MUST BE NOTIFIED IN THE EVENT THAT SIGNIFICANT ROOTS, 2-INCH DIAMETER OR LARGER, ARE FOUND DURING ANY GRADING, TRENCHING, OR CONSTRUCTION ACTIVITIES. THE WORK SHALL STOP, ROOTS SHALL BE COVERED WITH BURLAP OR MULCH, AND PROJECT ARBORIST CONTACTED TO PROVIDE RECOMMENDATIONS ON ROOT CUTTING AND TREATMENT OF IMPACTED ROOTS PRIOR TO CONTINUING WORK. 6. PROJECT ARBORIST TO PROVIDE GUIDANCE AND SUPERVISION PERTAINING TO REQUIRED TREE PRUNING WORK, MEET WITH THE APPROVED TREE SERVICE PROVIDER TO DISCUSS THE REQUIRED SCOPE OF WORK, AND PROVIDE INSPECTIONS AND OVERSIGHT AS NEEDED. ARBORIST'S INSPECTION SCHEDULE TREE SUMMARY: PROPOSED NUMBER OF EXISTING TREES TO REMAIN WITHIN LIMITS OF WORK: 10 PROPOSED NUMBER OF EXISTING TREES TO BE REMOVED: 12 PROPOSED NUMBER OF HERITAGE TREES TO BE REMOVED: 5 PROPOSED NUMBER OF EXISTING STUMPS TO BE REMOVED: 6 PROPOSED NUMBER OF NEW TREES: 122 (REFER TO L1.00 AND L1.01) LEGEND PROPERTY LINE EXISTING TREE TO BE PROTECTED IN PLACE (APPROXIMATE CANOPY) EXISTING TREE TO BE REMOVED (APPROXIMATE CANOPY) TREE PROTECTION FENCING (TEMPORARY) EXISTING TREES TO BE REMOVED TREE NUMBER SPECIES DBH (INCHES) NOTES 6 ACER BUERGERIANUM (MT) 7/4/4 11 POPULUS NIGRA ‘ITALICA’ (MT) 5/4/3 13 PRUNUS SPP. 6 14 MALUS SPP. 4 15 HESPEROCYPARIS MACROCARPA 56.5 PROTECTED HERITAGE TREE 16 HESPEROCYPARIS MACROCARPA 62 PROTECTED HERITAGE TREE 17 POPULUS NIGRA ‘ITALICA’ 25 PROTECTED HERITAGE TREE 19 POPULUS NIGRA ‘ITALICA’ (MT) 8/12 20 POPULUS NIGRA ‘ITALICA’ (MT) 14/16 PROTECTED HERITAGE TREE 22 DODONEA VISCOSA (MT) 4/3/3 25 EUCALYPTUS POLYANTHEMOS 28.5 PROTECTED HERITAGE TREE 26 QUERCUS ILEX (MT) 13/8.5 X X X EXISTING FENCE SWIFT STREET TREE REPLACEMENT NOTES: 1. PER COASTAL ZONE REQUIREMENTS, TREE REMOVAL REQUIRES A 2:1 REPLACEMENT. 2. TREES PROPOSED TO BE REMOVED MUST BE REPLACED WITH MINIMALLY TWO, 24"-INCH BOX-SIZED TREES 1. A TREE PRESERVATION ZONE (TPZ) SHALL BE ESTABLISHED AS SHOWN ON PLAN AND AS VERIFIED IN THE FIELD WITH OWNER'S REPRESENTATIVE OR PROJECT ARBORIST. PROJECT ARBORIST MUST INSPECT AND DOCUMENT THE INSTALLATION OF TREE PROTECTION BEFORE ANY EQUIPMENT COMES ON SITE. 2. TREE PROTECTION ZONE FENCING - FENCE HEIGHT TO BE 6 FEET AND MUST BE COMPRISED OF STEEL CHAIN-LINK CONSTRUCTION, ATTACHED TO STEEL POSTS DRIVEN INTO THE GROUND. LAMINATED TREE PROTECTION NOTICES MUST BE ATTACHED TO TPZ FENCES AT DISTANCES OF EVERY 10 FEET. ALL CONSTRUCTION ACTIVITIES MUST BE EXCLUDED FROM FENCED TREE PROTECTION ZONES. THESE FENCES MUST NOT BE DISMANTLED OR MOVED AT ANY TIME DURING THE CONSTRUCTION PERIOD, WITHOUT FIRST OBTAINING THE CONSENT OF THE OWNER'S REPRESENTATIVE OR PROJECT ARBORIST. 3. CONTRACTOR TO SUBMIT SCHEDULE OF TREE PROTECTION FENCE INSTALLATION AND REMOVAL FOR REVIEW AND APPROVAL BY OWNER'S REPRESENTATIVE PRIOR TO FENCE INSTALLATION OR REMOVAL. 4. VEHICLES AND EQUIPMENT MUST BE EXCLUDED FROM TREE PROTECTION ZONES. NO MATERIALS, TOOLS, DEBRIS, EXCESS SOIL, CHEMICALS, OR WASTE PRODUCTS MAY BE STORED OR DISPOSED OF WITHIN THESE PROTECTED AREAS. SOLVENTS, LIQUIDS, CONCRETE WASH-OFF, OR ANY TYPE OF DEBRIS SHOULD BE DISPOSED OF PROPERLY, NEVER WITHIN THIS PROTECTED AREA. 5. ALL TRENCHING NEAR EXISTING TREES TO REMAIN SHALL BE HAND DUG AND REVIEWED BY OWNER'S REPRESENTATIVE OR PROJECT ARBORIST. 6. NO SOIL COMPACTION SHALL OCCUR WITHIN THE TPZ. SOIL SURFACE WITHIN THE TPZ SHALL BE MULCHED WITH A 4-INCH LAYER OF AGED WOOD CHIPS AND SET BACK 9 INCHES FROM TRUNKS AT GRADE. WOOD CHIP MULCH SHALL BE APPROVED BY OWNER'S REPRESENTATIVE PRIOR TO ORDERING. SUBMIT MULCH SAMPLES TO OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. 7. NATURAL GRADE AROUND TPZ SHALL BE MAINTAINED. NO ADDITIONAL FILL OR EXCAVATION WILL BE PERMITTED WITHIN AREAS OF TREE ROOT DEVELOPMENT. 8. UNAUTHORIZED PRUNING OF ANY TREE SHALL NOT BE ALLOWED. IF ANY TREE CANOPY ENCROACHES ON THE PROJECT AREA, THE REQUIRED PRUNING WILL BE DONE WITH AUTHORITY OF OWNER'S REPRESENTATIVE OR PROJECT ARBORIST AND TO INTERNATIONAL SOCIETY OF ARBORICULTURE GUIDELINES (ISA) AND AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) A-300 PRUNING STANDARDS. 9. PROVIDE TEMPORARY IRRIGATION TO ALL TREES WITHIN THE FENCED AREA. CONTRACTOR TO PROVIDE WATERING SCHEDULE FOR OWNER'S REPRESENTATIVE REVIEW AND APPROVAL. WATERING SCHEDULE TO BE SUBMITTED FOR APPROVAL TEN (10) CALENDAR DAYS BEFORE CONSTRUCTION START DATE AND CONTINUE THROUGHOUT CONSTRUCTION UNTIL FINAL SIGN OFF BY OWNER'S REPRESENTATIVE. 10. CONTRACTOR TO REMOVE TREES AS SHOWN ON THE PLAN. PRIOR TO REMOVAL, CONTRACTOR TO CLEARLY MARK TREES AND WALK SITE WITH OWNER'S REPRESENTATIVE TO VERIFY TREES TO BE REMOVED. 11. CONTRACTOR TO FULLY REMOVE AND GRIND OR DIG OUT ALL STUMPS OF TREES TO BE REMOVED. 12. TREE PROTECTION FENCING TO BE REMOVED BY CONTRACTOR AFTER COMPLETION OF CONSTRUCTION AND AS DIRECTED BY OWNER'S REPRESENTATIVE. 13. SALVAGE AND REUSE REMOVED AND FALLEN EXISTING TREES ON SITE, IF POSSIBLE. 14. REFER TO CIVIL PLANS FOR EROSION CONTROL INFORMATION. 15. REFER TO CIVIL PLANS FOR GRADING AND DRAINAGE INFORMATION. 16. REFER TO ARBORIST REPORT BY NIGEL BELTON, DATED MAY 24TH, 2024, FOR ADDITIONAL INFORMATION. #1#2 #3 #4#5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #16 #15 #17 #19 #20 #21 #22 #23 #24 #25 #26 #XX #XX S S S S S S EXISTING TREE STUMP TO BE REMOVED S TREE STUMPS TO BE REMOVED - TYP. TREE STUMP TO BE REMOVED - TYP. TREE STUMP TO BE REMOVED - TYP. REFER TO ARBORIST REPORT BY NIGEL BELTON DATED MAY 24TH, 2024 #18 PREVIOUSLY REMOVED BY OTHERS TREE SUMMARY AND REPLACEMENT NOTES 100% SCHEMATIC DESIGN R1 08.28.2024 PLANNING PERMIT R1 08.28.2024 22.53 PROJECT ADDRESS 313 SWIFT ST SANTA CRUZ, CA 95060 SCCS Educator Housing NW23132 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date 100% SCHEMATIC DESIGN 06.14.2024 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 [email protected] +1 415-285-9193 Revisions and Description Date 515 SWIFT ST. SANTA CRUZ CA 95060 PHONE 831.423.6040 | WWW.JLJA.COM California Landscape Architect License 3163 L1.00 LANDSCAPE SITE PLAN LANDSCAPE DESIGN NARRATIVE SCALE  
  


T+E LANDSCAPE DESIGN )OR T+IS 08LTI)A0IL< RESIDENTIAL PRO-ECT INTENDED )OR T+E SC+OOL DISTRICT :OR.)ORCE AI0S TO )OSTER A SENSE O) CO008NIT< T+RO8G+ S+ARED O8TDOOR GAT+ERING SPACES IN A PAR.LI.E SETTING T+E DESIGN CONNECTS S0OOT+L< TO CIRC8LATION RO8TES EN+ANCES VIE:S )OR RESIDENTS AND NEIG+%ORS AND )ORGES LIN.S TO T+E O8TDOORS T+E LANDSCAPE INCORPORATES IN)OR0AL NAT8RE PLA< SPACES )EAT8RING %O8LDERS LOGS AND ST80PS NAT8RAL 0ATERIALS S8C+ AS :OOD AND DECO0POSED GRANITE CONTRI%8TE TO T+E COASTAL AEST+ETIC :+ILE CONCRETE AND STEEL CO0PLE0ENT NEIG+%ORING IND8STRIAL ARC+ITECT8RE T+E LANDSCAPE DESIGN APPROAC+ OPTI0I=ES T+E OVERALL LIVING E;PERIENCE )OR T+E SC+OOL DISTRICT :OR.)ORCE :+ILE +AR0ONI=ING :IT+ SANTA CR8=·S 8NI48E C+ARACTER 1" = 20'-0" S:I)T STREET A8TO0ATIC SLIDING VE+IC8LAR GATE STREET TREE AND TREE GRATE PER CIT< STANDARD DETAIL   
 
 
 
 












 
 
 


 
 LOADING =ONE 
 0A;I080 
TALL RETAINING :ALL CONCRETE RETAINING :ALL :IT+ )ENCE ON TOP :ALL TO %E 0A;I080  TALL 8NLESS OT+ER:ISE NOTED CO0%INED :ALL AND )ENCE +EIG+T TO %E  TALL ON PAT+ SIDE A8TO0ATIC SLIDING VE+IC8LAR GATE A8TO0ATIC SLIDING VE+IC8LAR GATE 
CLASS  %I.E PAR.ING SPACES

CLASS  %I.E PAR.ING SPACES

CLASS  %I.E PAR.ING SPACES E;ISTING %8ILDING E;ISTING %8ILDING O))SITE COVERED TRAS+ ENCLOS8RE ONSITE COVERED TRAS+ ENCLOS8RE E;ISTING SIDE:AL. TO RE0AIN NE: :IDENED SIDE:AL. RE)ER TO CIVIL I0PROVE0ENT PLANS E;ISTING CONCRETE TO RE0AIN OPEN SPACE PROPOSED PRIVATE OPEN SPACE  S)
0IN 
:IDT+
PROPOSED CO00ON8SEA%LE OPEN SPACE
 S)
0IN 
:IDT+
N80%ER O) D:ELLING 8NITS
 8SEA%LE OPEN SPACE PER 8NIT
 S) NOTE
8SEA%LE OPEN SPACE S+ALL CO0PL< :IT+ SANTA CR8= 08NICIPAL CODE SC0C  PRIVATE 8SEA%LE OPEN SPACE 08ST %E AT LEAST  )EET IN AN< +ORI=ONTAL DI0ENSION AND CO00ON 8SEA%LE SPACE 08ST %E AT LEAST  )EET IN AN< +ORI=ONTAL DI0ENSION 
CLASS  %I.E PAR.ING SPACES AND

%I.E SERVICE STATION INSIDE %8ILDING

CLASS  %I.E PAR.ING SPACES AND

%I.E SERVICE STATION INSIDE %8ILDING

%I.E DEPOTS

CLASS  %I.E PAR.ING SPACES

%I.E DEPOTS

CLASS  %I.E PAR.ING SPACES 



 
 
 
 LEGEND DECO0POSED GRANITE
 S)
PERVIO8S CONCRETE PAVING
 S)
E;ISTING TREE TO %E PROTECTED IN PLACE PROPERT< LINE ELECTRIC %%4  TOTAL
LITTER AND REC<CLING RECEPTACLES
 SETS TOTAL
ACCESSI%LE PICNIC TA%LE
 TOTAL

DECORATIVE PAVING
 S)
E;ISTING )ENCE REPLACE AS NEEDED C+IPSEAL OR STA%ILI=ED DECO0POSED GRANITE  )IRE TR8C. RATED  S)
LA:N
 S)
%IORETENTION PLANTING
 S)
PICNIC TA%LE
 TOTAL
TOP TA%LE
 TOTAL
%O8LDERS
 TOTAL
:OOD LOG
 TOTAL
S0ALLCANOP< TREE
 TOTAL
LARGECANOP< TREE

TOTAL
VINE S+R8% AND GRO8ND COVER PLANTING
 S)
STEEL PIC.ET )ENCE  )EET TALL
 L)
0ETAL +EADER
 L)
%ENC+
 TOTAL
CONCRETE STAIRS RE0OVA%LE %OLLARDS
 TOTAL
CONCRETE %LOC. RETAINING :ALL :IT+ CAP
 L)

SCREENING PLANTING
 S)
T8R) %LOC.  )IRE TR8C. RATED
 S)

SEEDED PLANTING
 S)
:OOD PEDESTRIAN %RIDGE %8ILDING OVER+ANG )IRE TR8C. T8RN ARO8ND STREET TREE  TOTAL
RE)RES+ O) E;ISTING PLANTING
 S)
PAR.ING LOT TREE
 TOTAL



 ACCESS GATES )OR E;ISTING )ENCING AT SC+OOL RESIDENTONL< ACCESS PROPERT< TO %E REPLACED P8%LIC CONNECTION )RO0 S:I)T STREET TO DER%< PAR. ACCESS SC+OOL ACCESS  :IDE )LARE AT PEDESTRIAN CONNECTION
 
:IDE )LARE AT PEDESTRIAN CONNECTION



 1 1 1 1 2 2 2 5 5 5 5 66 6 6 3 3 CODE DESCRIPTION )I;ED OR 0OVA%LE SEATING PICNICST<LE TA%LES S+ADE TREES NATIVE +A%ITAT O8TDOOR .ITC+EN E48IP0ENT LA:N AREA 123456 OPEN SPACE PROGRAMMING 3 CLASS %I.E RAC. DERO +OOP RAC. +EAV< D8T<  TOTAL   SPACES

CLASS  PRE)A%RICATED %I.E S+ELTER CAGED :IT+ ELECTRONIC ACCESS DERO %I.E S+ELTERS :IT+ DERO DEC.ER  %I.ES

 DEPOTS TOTAL   SPACES
4 4 PRIVATE OPEN SPACE
PATIO
T<P 


100% SCHEMATIC DESIGN R1 08.28.2024 PLANNING PERMIT R1 08.28.2024 22.54 SYMBOL TYPE QUANTITY TREES SMALL CANOPY TREE: - CARPINUS BETULUS 'FASTIGIATA' - LAGERSTROEMIA INDICA - HYMENOSPORUM FLAVUM 57 PARKING LOT TREE: - LAURUS NOBILIS 'SARATOGA' - METROSIDEROS EXCELSA 20 STREET TREE: - ARBUTUS X 'MARINA' 6 LARGE CANOPY TREE: - QUERCUS AGRIFOLIA - LOPHOSTEMON CONFERTUS 39 PROJECT ADDRESS 313 SWIFT ST SANTA CRUZ, CA 95060 SCCS Educator Housing NW23132 Stamp Consultant Sheet Number Sheet Title EHDD Job Number Drawn by Scale Printing Date 100% SCHEMATIC DESIGN 06.14.2024 PIER 1, BAY 2 THE EMBARCADERO SAN FRANCISCO, CA 94111 [email protected] +1 415-285-9193 Revisions and Description Date 515 SWIFT ST. SANTA CRUZ CA 95060 PHONE 831.423.6040 | WWW.JLJA.COM California Landscape Architect License 3163 N/A L1.01 LANDSCAPE NOTES, PLANT LIST, & PLANT IMAGES IRRIGATION NOTES PLANTING NOTES 1. THE IRRIGATION SYSTEM, IN COMPLIANCE WITH STATE AND LOCAL WATER EFFICIENT LANDSCAPE ORDINANCES, WILL BE DESIGNED TO APPLY THE MINIMUM AMOUNT OF WATER REQUIRED TO MAINTAIN GOOD PLANT HEALTH. TO ACCOMPLISH THIS, THE SYSTEM WILL INCLUDE AN AUTOMATIC WEATHER-BASED CONTROLLER, RAIN SHUT-OFF DEVICE, MASTER CONTROL VALVE, FLOW SENSOR, MATCHED PRECIPITATION RATE SPRINKLER HEADS, ROTORS, BUBBLERS, OR DRIP EMITTERS, A PROPER SETBACK FROM NON-PERMEABLE SURFACES, AND SEPARATE SOLENOID CONTROL VALVES FOR DIFFERENT HYDROZONES (PLANT WATER USE LEVELS); IT WILL BE DESIGNED TO PREVENT RUNOFF AND OVERSPRAY. THE IRRIGATION SYSTEM WILL INCLUDE WATERING SCHEDULES BASED ON LOCAL EVAPOTRANSPIRATION DATA TAKEN FROM CIMIS AND WILL BE REGULATED BY THE AUTOMATIC IRRIGATION CONTROLLER. 1. CONTRACTOR SHALL PROCURE PLANT SPECIES WITHIN THIRTY (30) DAYS OF AWARD OF THE CONTRACT. CONTRACTOR SHALL BE RESPONSIBLE FOR PLACING REQUIRED DEPOSITS TO ENSURE TIMELY PROCUREMENT OF THE SPECIFIED PLANTS. CONTRACTOR SHALL PROVIDE OWNER'S REPRESENTATIVE WITH WRITTEN VERIFICATION (RECEIPTS) SHOWING PROCUREMENT TO MEET THE PLANTING REQUIREMENTS. CONTRACTOR TO SUBMIT PHOTOGRAPHS OF ALL PLANTS FOR REVIEW AND APPROVAL BY OWNER'S REPRESENTATIVE. PLANTS MAY NEED TO BE CONTRACT GROWN TO ENSURE PLANT AVAILABILITY. 2. ALL EXISTING TREES TO REMAIN SHALL BE PROTECTED IN PLACE UNLESS NOTED OTHERWISE. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE OF ANY KIND TO EXISTING TREES DURING THE COURSE OF CONSTRUCTION. 3. HOLD FINISHED GRADES FOR SHRUB AREAS 1 1/2 INCHES BELOW TOP OF ADJACENT PAVEMENT OR WALLS, UNLESS OTHERWISE NOTED ON THE DRAWINGS. 4. GRADUALLY ROUND OFF TOPS AND TOES OF ALL PLANTED SLOPES TO PRODUCE A SMOOTH AND NATURAL TRANSITION BETWEEN EXISTING PLANTING, FINISH GRADES, AND NEW PLANTING. 5. CONTRACTOR SHALL NOTIFY OWNER'S REPRESENTATIVE A MINIMUM OF FIVE (5) DAYS IN ADVANCE TO SCHEDULE PLANT DELIVERY DATES. OWNER'S REPRESENTATIVE SHALL INSPECT PLANTS UPON ARRIVAL AND RESERVES THE RIGHT TO REJECT PLANTS. 6. CONTRACTOR SHALL PLACE PLANTS AS SHOWN ON PLAN AND VERIFY LOCATION WITH OWNER'S REPRESENTATIVE. OWNER'S REPRESENTATIVE MAY REQUEST THAT CONTRACTOR ADJUST OR RELOCATE PLANTS ON-SITE AS NEEDED TO PROPERLY COMPLETE DESIGN. 7. CONTRACTOR TO PROTECT ALL NEW PLANTS FROM GOPHERS, RODENTS, DEER, AND OTHER ANIMALS. TYPE AND EXTENT OF PROTECTION MEASURES SHALL BE DETERMINED BY CONTRACTOR AND SUBMITTED TO OWNER'S REPRESENTATIVE FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. 8. TYPICAL OF ALL TREES - KEEP ALL SHRUBS, GRASSES, PERENNIALS, GROUND COVER, VINES, OR SUCCULENTS 18 INCHES CLEAR FROM ANY EXISTING OR NEW TREE TRUNK. 9. IF SOIL IS LIME TREATED, PLANTING AREAS TO BE EXCAVATED WITHIN 6 INCHES OF THE EDGE OF PAVING/CURB TO A MINIMUM DEPTH OF 18 INCHES OR UNTIL LIME-TREATED SOIL IS FULLY REMOVED. DISPOSE OF EXCAVATED SOIL OFF-SITE. PLANTING AREAS TO BE FILLED WITH IMPORTED TOPSOIL AMENDED PER SOILS REPORT. PLANTING AREAS TO BE TESTED FOR PROPER DRAINAGE PRIOR TO PLANTING. 10. COMPACTED SOILS MUST BE TRANSFORMED TO A FRIABLE CONDITION TO MAXIMIZE WATER RETENTION. 11. SOIL AMENDMENTS MUST BE INCORPORATED ACCORDING TO RECOMMENDATIONS OF THE SOIL ANALYSIS REPORT AND WHAT IS APPROPRIATE FOR THE PLANTS SELECTED. 12. INCORPORATE COMPOST INTO THE SOIL TO A MINIMUM RATE OF 6 CUBIC YARDS PER 1000 SQUARE FEET. SOILS WITH GREATER THAN 6% ORGANIC MATTER IN THE TOP 6 INCHES OF SOIL ARE EXEMPT FROM ADDING COMPOST AND TILLING UNLESS OTHERWISE DIRECTED BY LANDSCAPE ARCHITECT. 13. PROVIDE A MINIMUM OF 3 INCHES OF WOOD CHIP MULCH TO SOIL SURFACE AFTER PLANTING AND AROUND EXISTING TREES AND SHRUBS TO REMAIN. MULCH SHALL NOT BE PLACED WITHIN A 12-INCH DIAMETER OF TREE TRUNKS AND SHOULD BE KEPT FREE FROM THE CROWN OF ALL SHRUBS, GRASSES, AND PERENNIALS. DO NOT MULCH SEEDED AREAS. MULCH FOR RAIN GARDENS SHALL BE NON-FLOATING, AS ACCEPTED BY LANDSCAPE ARCHITECT. MULCH FOR ALL OTHER PLANTING AREAS SHALL BE 1/2-INCH TO 1-INCH DIAMETER REDWOOD CHIPS, FREE OF STICKS, DIRT, AND OTHER DEBRIS, AS ACCEPTED BY LANDSCAPE ARCHITECT. 14. CONTRACTOR TO REVIEW ALL PLANS AND SPECIFICATIONS FOR SUBMITTALS, TESTING, AND OTHER REQUIREMENTS. CONTRACTOR TO IMMEDIATELY NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES BETWEEN SITE CONDITIONS AND INTENT OF THESE DRAWINGS. ANY CONFLICTS WILL BE RESOLVED PRIOR TO COMPLETING WORK. PLANT IMAGES CONCEPTUAL PLANT LIST QUERCUS AGRIFOLIA (COAST LIVE OAK) CARPINUS BETULUS 'FASTIGIATA' (PYRAMIDAL EUROPEAN HORNBEAM) ARBUTUS X 'MARINA' LAGERSTROEMIA INDICA (CRAPE MYRTLE) (MARINA STRAWBERRY TREE) HEUCHERA MAXIMA (ISLAND ALUM ROOT) POLYSTICHUM MUNITUM (WESTERN SWORD FERN) MIMULUS AURANTIACUS (STICKY MONKEY-FLOWER) MUHLENBERGIA RIGENS (DEERGRASS) SALVIA CLEVELANDII (CLEVELAND SAGE) SALVIA SONOMENSIS (SONOMA SAGE) CEANOTHUS THYRSIFLORUS HETEROMELES ARBUTIFOLIA (TOYON) (BLUE BLOSSOM CEANOTHUS) VACCINIUM OVATUM (CALIFORNIA HUCKLEBERRY) SESLERIA AUTUMNALIS (AUTUMN MOOR GRASS) CALAMAGROSTIS FOLIOSA CAREX TUMULICOLA (FOOTHILL SEDGE) (CAPE MENDOCINO REED GRASS) TREES SHRUBS AND GROUND COVERS (15 GAL AND 24" BOX) SHRUBS (1 AND 5 GALLON UNLESS NOTED OTHERWISE) LAWN: - FESCUE AND BLUEGRASS BLEND SOD BIORETENTION PLANTING: - ACHILLEA MILLEFOLIUM - CALAMAGROSTIS X ACUTIFLORA 'KARL FOERSTER' - FESTUCA RUBRA - SISYRINCHIUM BELLUM SHRUB AND GROUND COVER PLANTING: - BACCHARIS PILULARIS 'PIGEON POINT' - CALAMAGROSTIS FOLIOSA - CAREX TUMULICOLA - HEUCHERA MAXIMA - LESSINGIA FILAGINIFOLIA 'SILVER CARPET' - MIMULUS AURANTIACUS - MUHLENBERGIA RIGENS - POLYSTICHUM MUNITUM - SALVIA CLEVELANDII - SALVIA SONOMENSIS - SESLERIA AUTUMNALIS - VACCINIUM OVATUM 30,600 SF 18,100 SF 6,300 SF SEEDED PLANTING: - CALIFORNIA NATIVE MEADOW SEED MIX SCREENING PLANTING: - ARCTOSTAPHYLOS MANZANITA 'DR. HURD' - CEANOTHUS 'JULIA PHELPS' - CEANOTHUS THYRSIFLORUS - HETEROMELES ARBUTIFOLIA 1,800 SF 3,700 SF REFRESH OF EXISTING PLANTING 4,500 SFSCREENING LAWN CEANOTHUS 'JULIA PHELPS' (SMALL LEAF MOUNTAIN LILAC) LESSINGIA FILAGINIFOLIA 'SILVER CARPET' (SILVER CARPET BEACH ASTER) BACCHARIS PILULARIS 'PIGEON POINT' (DWARF COYOTE BRUSH) ARCTOSTAPHYLOS MANZANITA 'DR. HURD' (DR. HURD MANZANITA) FESCUE AND BLUEGRASS BLEND SOD CALAMAGROSTIS X ACUTIFLORA 'KARL FOERSTER' (FEATHER REED GRASS)

BIORETENTION

ACHILLEA MILLEFOLIUM (YARROW) FESTUCA RUBRA (RED FESCUE) SISYRINCHIUM BELLUM (BLUE-EYED GRASS) SEEDED PLANTNIG CALIFORNIA NATIVE MEADOW SEED MIX HYMENOSPORUM FLAVUM (SWEETSHADE) LAURUS NOBILIS 'SARATOGA' (SARATOGA LAUREL) METROSIDEROS EXCELSA (NEW ZEALAND CHRISTMAS TREE) LOPHOSTEMON CONFERTUS (BRISBANE BOX) SYMBOL TYPE QUANTITY TOTAL NEW TREES: 122 100% SCHEMATIC DESIGN R1 08.28.2024 PLANNING PERMIT R1 08.28.2024 22.55 42" TT TREE
42" TT TREE
16" TREE
12" PINE
22" MT TREE
16" RDWD
16" RDWD
16" RDWD
16" RDWD
18" RDWD
46" STUMP
6" TREE
6" TREE
38" STUMP
36" STUMP
38" STUMP
16" TT TREE
18" MT TREE
4" TREE
4" TREE
4" TREE
4" TREE
6" TREE
5" TREE
20" TREE
IRR
RI R
UTIL. RISER
UT LI . R SI ER
UTIL.

UTIL.

51.67 51.70

52.46 52.39

52.39 53.93

53.94 55.64 55.82

56.30 55.9
5 9

6.20 56.18 56.19

56.30 56.32

55.94 55.97

56.01 55.7063

56.14 55.84

55.88 55.88

55.77 55.7
5 0

5.69 55.66

55.63 55.65

55.04 55.06

55.03 55.34

55.73 55.75

56.27 56.26

56.32 54.48 55.00 4.32

54.69 55.17 4.66

55.2854.96

53.91 4.74

54.2289

54.37 54.62

55.02 54.57 55.12

54.64 54.89

54.46 70.96
TOP
TOE
TOE
TOE
TOE
TOE
TEL
TV
TEL
EB
TV
TEL

52.58 54.37

52.43 52.91

49.97 50.06

53.85 47.64

52.67 50.06

52.81 53.78

51.01 53.30

55.57 55.69

54.50 54.08
EB
EB
SL
EB
FW
WM
FW
WM
GB
GB
GB
GB
GB
GB
GB

BASKETBALL COURT

DRINKING

FOUNTAIN
(E)

BUILDING
SHED
RAMP
GATE

CLF CLF
GATE
DENSE

VEGITATION
HEDGE
HEDGE
(E)

BUILDING
(E)

BUILDING

STORAGE SHED
(E)

BUILDING
BLOCK
WALL

BUSINESS SIGN

SEWER BOX
SCHOOL

CROSSING

PARKING
SDCB
RIM=53.61'
INV=51.83'
METAL

AWNING (E)

BUILDING
RAMP
(E)

MODULAR
(E)

MODULAR
RAMP
GATE
SDCB
RIM=53.59'
INV=51.59'
SDCB
RIM=53.33'
INV=46.93'

PLANTER
SDCB
RIM=53.39'
INV=46.84'
SDCB
RIM=53.49'
INV=46.69'
LANDING@DOOR
=54.82'
LANDING@DOOR
=54.85' HOSE
BIB
SDMH
RIM=53.59'
INV=47.09'
SDCB
GRATE=49.07'
INV=46.22'
SDMH
RIM=51.50'
INV=46.20'
SDMH
RIM=48.70'
INV(N)=39.03'
INV(S)=38.83'
SDMH
RIM=50.33'
INV(N)=40.99'
INV(S)=40.87'

SCHOOL S GI N
STOP
SIGN
AHEAD

PARKING
SDCB
GRATE=50.05'
INV=47.27'

DR VI EWAY

DR VI EWAY
SDCB
GRATE=49.16'
INV=44.26'
SSMH
RIM=48.77'
INV(N)=43.58'
INV(E)=43.44'
SSMH
RIM=51.99'
INV(N)=43.99'
INV(S)=43.93'
1-1/2" WATER PIPE
HOSE
BIB
CC@DOOR
=53.92'
CC@DOOR
=53.95'
CC@DOOR
=53.96'
CC@DOOR
=53.95'
CC@DOOR
=53.94'
CC@DOOR
=53.91'
CC@DOOR
=53.94'
CC@DOOR
=53.93'
CC@DOOR
=53.97'
CC@DOOR
=53.95'
CC@DOOR
=53.96'
1-1/2" WATER PIPE

PARKING
CLF
CLF
CLF
CLF

THRESHOLD
=53.90'
(E)

BUILDING

THRESHOLD
=53.87'

THRESHOLD
=53.84'
HOSE
BIB

CLUSTER
GROUP

MAILBOXES
GATE

GATE TRASH

ENCLOSURE

PLANTER
S GI N

DRIVEWAY
3"
CURB
DRAINS
SDCB w/
PUMP
GRATE=55.04'
INV=52.04'

AREA DRAIN
RIM=55.09'
INV=53.36'
NO

PARKING/
END
SDCB
GRATE=53.61'
INV=51.11'
SDCB
RIM=53.45'
INV=51.53'

THRESHOLD
=55.80'

BOLLARD LIGHT

GROUND LIGHT

PARKING

METAL FENCE
NO

PARKING

51.9 5
9 1.99

51.98 50.3
5 3

0.34 50.32

49.24 49.14 49.63

49.72 49.92

49.94 49.81

49.36 49.42

49.35 49.40

49.72 49.18

49.16 49.35

49.16 49.25

49.36 49.59

50.09 50.17

50.47 50.36 50.32

49.91 50.02

50.40 50.54

50.49 50.53

50.04 50.17

50.42 50.31 50.76

50.85 51.08

51.00 50.54

50.62 50.91

50.81 51.27

51.33 51.51

51.4450.98

51.09 51.25

51.14 51.61

51.71 51.90

51.79 51.34

51.46 51.58

51.43 51.89

51.97 51.97

52.09 51.56

51.80 52.15

51.66 52.07

52.54 52.45

52.00 52.12

52.23 52.11 52.58

52.64 52.90

52.80 52.32

52.47 52.76

52.57 52.98

52.75 52.61

52.44 52.29

52.14 52.02

51.86 51.69

51.50 51.27

51.08 50.85

50.60 50.35

50.16 49.95

49.72 49.86

49.86 50.11

50.15 50.34

50.61 50.82

50.85 51.03

51.05 51.25

51.28 51.42

50.06 50.26

50.45 50.65

50.94 51.14

51.37 51.58

51.81 52.00

52.14 52.32

52.53 52.80

53.07 53.35

52.89 52.71

52.58 52.54

53.06 53.02

53.05 53.44

53.61 53.79

53.79 53.99 53.78

53.56 53.55

53.70 53.64

53.69 53.57

54.21 53.28

53.27 53.68

53.89 54.78 54.68

54.78 53.90

54.13 55.23

55.02 54.13

54.03 53.34

53.56 53.18

52.79 52.68

53.05 52.97

53.43 52.73

52.73 53.63

53.86 53.42

53.14 53.10

52.61 52.29

52.10 52.21

52.09 52.07

53.69 53.63

53.65 53.66

53.76 54.00 3.8453.95

53.77 53.56

53.48 53.46

53.46 53.58

52.05 51.92

53.34 51.94

51.64 51.58

51.68 52.55

53.31 53.44

52.02 51.66

51.45 51.34

51.10 51.40

50.38 50.07

50.06 50.06

50.04 50.0
56 0.06

50.05 51.09

51.21 50.81

50.61 52.54

53.7953.89

53.93 53.95

53.90 53.89

53.93 53.92

53.92 53.91

53.91 53.93

53.93 53.92

53.91 53.91

53.91 53.94

53.95 53.93

53.90 53.93

53.93 53.90

53.92 53.92

53.92 53.7493

53.93 53.82

53.77 53.91

53.92 53.91

53.93 53.93

53.93 53.94

52.82 51.86

51.52 51.44

51.27 51.29

51.33 51.34

51.69 51.67

51.65 51.69

52.23 52.25

52.26 52.58

52.63 52.67 52.61

52.60 52.56

52.64 53.21

53.55 53.72

52.87 51.85

53.30 53.19

53.31 53.06

52.12 50.62 50.62

50.88 51.12

51.36 51.57

51.67 51.84

54.02 53.96

48.74 48.7
4 0

8.73 48.68

48.7 47

8.78 48.79

49.86 49.99

50.03 49.90 9.8

49. 6
83 49.81

50.49 50.39

50.1 50.
6 16

50.11 50.39

50.54 50.44

50.62 50.5

50. 5
55 50.58

50.34 50.68 0.70

50.50 50.80

50.80 50.77

51.50 51.86 51.91

51.77 51.75

52.40 52.56 52.57

52.43 52.4
5 2

2.56 52.56

52.30 52.18 2.50

51.83 51.90

51.18 50.53

52.20 52.27

52.41 52.39

52.70 52.74

52.70 52.72

52.75 52.74

52.74 52.74

52.76 52.38

52.35 52.45 52.45

51.92 52.14 52.23

52.14 50.57

50.71 50.09

49.71 49.71

49.65 49.66

49.08 49.09

49.0549.07 50.08

49.86 50.15

50.21 50.74 50.93

51.35 51.19

51.38 51.51

51.71 51.65

51.95 51.93

52.45 52.60

52.81 52.86

53.82 53.81

53.77 53.77

53.83 53.824

52.79 52.72

52.71 52.72

52.64 52.70

52.92 52.83

51.30 51.20

52.52 52.41

52.56 51.43

50.95 50.88

50.90 50.66

50.67 50.53

52.53 52.62

52.58 52.47

52.29 52.46

52.33 52.62 52.57

52.70 52.60

52.59 52.71

52.66 52.67

52.66 52.76

52.77 52.74 52.7
5 9

2.79 52.68 52.55

52.58 52.72

52.79 52.72 52.53

52.08 52.27

52.1 5
3 2.21

51.54 51.06

51.54 51.80

51.87 52.00

52.16 52.51

52.70 52.24

51.89 52.05

51.78 51.59

51.40 51.53

51.3312

50.71 50.84

50.30 50.23

50.10 50.73

52.77 52.24

51.68 52.62

52.76 52.64

53.00 53.10

53.10 53.11

53.25 52.05

53.49 53.50 3. 8

53.3021

53.071

53.29 53.32

53.82 53.63

53.78 52.34

52.68 53.02

52.84 52.71

53.28 53.26

52.68 2. 7

53.10 3.24

53.71 53.37

53.80 53.16

53.1 57

2.93 53.82

53.80 53.78

53.75 53.75

53.77 53.78

53.85 53.86

53.77 53.76 53.77

53.74 53.76

54.82 54.86

54.87 54.81

54.83 54.84

54.85 53.80

53.82 54.83

54.84 54.82

54.92 54.82

54.82 54.82

53.92 53.94

53.93 53.63 53.75

53.70 53.62

53.66 53.74

53.785

54.08 54.01

53.93 53.67

53.3 53.
9 51

53.57 53.57

53.62 53.70

53.80 53.67

53.49 53.95

53.87 53.97

53.94 53.91

53.89 53.75 3. 7

53.76 3.

53.65 53.78

53.77 53.69

53.68 53.77

53.78 3.80

54.40 54.38

54.14 53.80

54.00 53.9
5 9

3.98 53.93

53.79 54.06

53.97 54.00

53.96 53.95 53.94

53.9 53.
1 94

53.93 3.79

53.96 3. 5

53.89 53.81

53.81 53.88

53.87 53.81

53.81 53.82

53.88 53.88

53.88 53.88

53.59 53.82

53.91 53.88

53.94 54.00

53.99 53.96

53.94 53.95

53.94 53.93

53.93 53.9453.94

53.9 53.
5 96

53.93 53.94

53.95 53.94

53.94 53.94

53.96 53.87

53.84 53.93

53.86 53.94

53.78 53.68

53.94 53.95

53.97 53.94

54.13 54.09

53.97 54.02

54.11 54.14

53.93 53.92

53.92 53.88 3.

53.83 53.88

53.57 53.40

53.60 3.56

53.59 53.67

53.69 53.72

53.77 53.77

53.77 53.33

52.64 52.70

52.78 52.80

52.71 52.75

52.79 52.84 52.85

53.88 53.86

53.90 53.875 2

52.90 2.

52.89 52.94

52.97 53.74

53.78 53.79 53.66

53.81 53.86

53.8 5
7 3.62

53.60 53.64

53.41 53.66 53.46 3. 0

53.19 3.15

52.88 93

52.81 2.60

53.02 3.11

53.29 51.75

51.38 51.35

51.11 51.12

50.87 50.78

50.8450.85

50.87 50.87

50.89 50.83

50.76 50.78

50.75 50.78

50.91 51.12

53.00 51.26

50.91 51.13

50.96 50.61

50.72 50.61

51.13 50.70

51.04 51.08

50.75 51.00

50.70 50.56

50.37 50.74

50.76 51.23

50.54 50.26

50.80 50.50

50.84 50.96

50.74 50.82

50.94 50.54

50.29 50.23

50.19 49.92

49.95 49.91

49.91 49.93

49.96 50.13

50.94 51.11

53.82 53.94

53.93 53.94

53.98 53.91

53.90 53.96

53.96 53.96

53.94 53.71

53.77 53.61

53.86 53.95

53.97 53.97

53.96 53.96

54.66 54.00

54.09 54.23

54.45 5

4.62 54.44

54.32 55.04

54.84 54.56

52.75 52.82

52.57 52.18

52.75 52.78

52.70 52.84

53.06 53.12

53.12 52.79

53.03 54.20

54.57 53.36

52.82 52.78

52.73 52.81

52.77 52.60

52.51 52.39

52.39 52.48

52.28 51.88

52.70 52.52

51.41 51.22

53.98 54.13

54.41 54.50

54.58 54.43

54.46 54.89

55.02 55.32

55.09 54.88

55.64 55.50

55.97 55.89

55.45 55.59

55.59 55.44

55.85 55.83

55.37 55.53

55.47 55.32

55.42 55.28

55.71 55.72

55.30 55.38

55.28 55.28

55.36 55.22

55.63 55.53

55.46 55.59

55.15 55.30

55.54 55.58

55.61 55.63

55.69 55.76

55.82 55.86

55.90 56.05 56.06

56.08 56.02

56.00 55.95

55.992

55.983

55.87 55.93 55.90

55.86 55.86 55.842

55.80 55.84

55.8069

55.5765

55.83 56.01

55.97 55.72

55.90 55.91 56.17 55.78

55.44 55.8561

55.43 55.795

55.96603 55.62

55.89 56.32

56.10 56.3256.12

56.20 56.23

56.84 56.72

56.73 56.32

56.34 56.16 55.94

56.06 56.31

56.33 55.62 55.68

55.63 55.54

55.6271

55.56 55.72 56.05 5.97

56.31 56.57

56.76 56.76

56.76 56.74

56.58 56.83 55.89 93

55.93 5. 2

56.50 57.17

57.10 56.02

56.08 56.04

56.15 56.26

55.0 55.
4 08

55.25 55.38

55.35 55.41

55.32 55.75

55.0755.10

55.09 55.64 55.74

55.75 56.51

56.46 55.85

55.46 55.26

55.5 5
6 5.64 56.07 5.83

55.63 55.24

55.17 55.00

55.02 54.92

54.82 54.73

54.56 54.69

55.09 4.6354.69 5.1 54.73

54.71 55.10 4.68

54.38 55.04

54.55 54.49

54.40 55.0

54.56 54.28

54.46 54.68

54.86 55.07

55.36 55.61

55.45 55.41

55.25 55.11

54.91 54.75

54.69 54.69 55.22 54.71

54.78 55.26 54.79

54.85 55.28 54.87

55.00 55.2805

55.04 55.30

55.08 55.37

55.1 5
6 5.41

55.35 55.48

55.53 55.59

55.60 55.67

55.73 55.79

55.82 55.8364 57.28

56.53 56.52 55.90 5.87

55.74 5. 0

55.59 5.62

55.59 55.59

55.62 55.53

55.4857

55.49 55.42

55.34 55.45

55.45 32

55.29 55.39 55.38

55.36 55.47

55.46 55.44

55.23 53.98

53.89 53.91

53.90 53.90

53.92 54.00

54.04 54.49 54.46

54.35 54.80 54.12

54.23 54.23

54.29 54.77 54.07

53.94 53.63

53.63 53.59

53.61 53.58

53.79 53.90 54.29

53.57 53.50

53.49 53.48

53.45 54.16

54.08 53.98

53.92 53.91

53.96 55.2
5 2

5.25 55.7549

55.62 55.35

55.17 55.1
5 1

5.16 54.89 55.3821

55.39 54.85 54.49

54.9247

54.45 54.48

54.96 54.31

54.52 54.70

54.31 54.98

54.57 54.62 55.02

54.62 55.0
5 2

5.07 54.75

54.65 55.06

54.65 55.12

55.14 54.74

54.94 54.615 46

54.46 54.60

55.05 54.55

54.61 55.06 54.55

54.75 54.76 54.82

54.78 55.2706

54.80 54.86 55.2
50 4.84

54.72 54.68 55.23

54.70 54.82

55.24 54.80

55.16 55.18 54.76

54.71 55.13 4.30

54.45 55.12 54.62

54.6453

54.46 54.91

55.24 55.38

55.41 55.3
5 2

6.86 56.86

56.86 56.86

55.38 55.38

55.17 55.16 55.05

54.90 55.16

54.72 4. 6 55.18 4.93

54.85 54.63

54.21 54.14

54.09 54.39 54.9366

54.48 54.94 54. 754.46 5.01 54.57

54.79 54.31

54.24 4. 6 54.7459

54.49 54.67

54.24 54.35

54.32 54.8358

54.74 54.36

54.48 54.936

54.93 55.02

54.67 54.91 54.41

54.46 54.92 54.77

54.84 54.41

54.42 54.36

54.4954.96

54.54 54.86

54.49 54.95 54.48

54.41 54.89

54.21 54.78 54.69

54.69 54.71

54.22 54.35

54.9288

54.9855.04 54.26

54.78 54.28

54.25 54.02

54.48 55.02 54.69

54.6085

54.36 54.30

54.8360 54.5178

54.43 54.49

54.735 58

54.64 54.89

55.24 54.89

55.25 55.06

54.74 4.88

54.78 54.51

54.85 54.92

54.67 54.66

54.66 54.50

54.22 54.09

54.18 54.14

54.06 53.51

53.90 54.96

54.86 54.57

54.46 54.49

54.63 54.95

55.0854.71

55.14 55.09

55.04 55.04

54.65 54.59 54.99 54.60

54.39 54.95

54.55 54.48

54.93 54.27

55.17 54.96

55.17 55.13

55.13 55.12

55.13 55.13

71.12 55.40

55.59 54.96

55.22 55.76

55.78 55.80

55.26 55.60 55.47

54.48 54.56

54.60 55.06
5,000, 5,000
CO
UV
CO
CO
CO
SSCO
WV
WV
CO
D
CO
D
D
D
CO
WV
S
S
DS
DS DS
DS
DS
DS
DS
DS
DS DS
GM
GM
DS
H Y D
DS
7"/8"/4" ACER
46" STUMP
38" STUMP
36" STUMP
38" STUMP
13"/8.5" QUERCUS
5"/4"/3" POPULUS

56.5" HESPEROCYPARIS
22" STUMP
62" AT 12"> GROUND

HESPEROCYPARIS
4"/3"/3" DODONEA
8"/12" POPULUS
14"/16" POPULUS
25+" POPULUS
6" PRUNUS 4" MALUS
44" PINUS

7.5"/7"8"/5.5" CINNAMOMUM
25+" POPULUS
40" POPULUS
8"/17" POPULUS
14" POPULUS
11" PINUS
18" SEQUOIA

16.5" SEQUOIA
17" SEQUOIA

16.5" SEQUOIA
20" SEQUOIA
21" JUGLANS
16" TT TREE 18" MT TREE
4" TREE 4" TREE
6" TREE
5" TREE
17" CINNAMOMUM
4" TREE
4" TREE

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT ON

NI KRAP G
ON

NI KRAP G
ON

NI KRAP G
ON

NI KRAP G
VE

GRAHC GNI
YLNO
VE

GRAHC GNI
YLNO
VE

GRAHC GNI
YLNO
VE

GRAHC GNI
YLNO

COMPACT

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT ON

NI KRAP G
ON

NI KRAP G
VE

GRAHC GNI
YLNO

COMPACT COMPACT COMPACT

AP MOC TC AP MOC TC

COMPACT

AP MOC TC AP MOC TC AP MOC TC
EV

CHARGING
ONLY
EV

CHARGING
EV
ONLY

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
EV

CHARGING
ONLY
24 SPOTS
(11) STANDARD
(13) COMPACT
119 TOTAL SPOTS
(40) STANDARD
(58) COMPACT
(15) EV
(3) VAN ADA
(3) STANDARD ADA

X X X X X X X X X X X X X X X X X X X
X
X X X
X X
X

X X X X X X
X

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X (7) EV (3) EV
2 SPOTS
(1) STANDARD ADA
(1) VAN ADA
(13) COMPACT
(10) COMPACT
(10) COMPACT
(12) COMPACT
24 SPOTS
(16) STANDARD
(5) EV
(2) STANDARD ADA
(1) VAN ADA
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
(5) COMPACT
X X

X X X X X
121 TOTAL SPOTS
(83) COMPACT
(3) STANDARD
11 SPOTS
(10) STANDARD
(1) VAN ADA

X X X X X X X X X
1 A0.13
2 A0.13
(E) 1-STORY EDUCATIONAL BLDG TO REMAIN
NOTE:
• 3,308 S.F. EDUCATIONAL BUILDING USED THE

WESTSIDE PARENT EDUCATION NURSERY SCHOOL,
WHICH WILL MOVE OUT BY JANUARY 1, 2025.
• THE USE IS PROPOSED TO BE CHANGED TO

STORAGE EXCLUSIVELY FOR RESIDENTS OF THE
PROPOSED RESIDENTIAL DEVELOPMENT.
(E) 1-STORY BLDG TO REMAIN
NOTE:
• 2,077 S.F. ADMINISTRATIVE BUILDING USED BY THE

SANTA CRUZ EDUCATION FOUNDATION, WHICH WILL
MOVE OUT PRIOR TO THE START OF CONSTRUCTION.
• THE USE IS PROPOSED TO BE CHANGED TO BE

PROPERTY MANAGEMENT OFFICES AND SUPPORT

SPACES FOR THE PROPOSED RESIDENTIAL
DEVELOPMENT.

ASSUMED ACCESS EASEMENT,

SEE CIVIL & LANDSCAPE DWGS
241' - 3"
1 8' -
6 "
NOTE: PROJECT RETAINS EXISTING
ADDRSS AND APN DESIGNATION:
313 SWIFT STREET
APN: 003-16-132
ADJACENT ZONING: I-G / PER2
ADJACENT ZONING: I-G / PER2
ADJACENT ZONING: I-G / PER2
ADJACENT ZONING: I-G / PER2
R-1-5 ZONE (ACROSS SWIFT ST)
640' - 0"
259' -
9"
3 1
3' -
1 1
"

ACCESS TO SERGEANT DERBY PARK
(N) PUBLIC PATHWAY W/ ACCESS
FROM SWIFT ST. TO SERGEANT

DERBY PARK, SLD
70' -
1 1
"
(2) ONE STORY MOBILE, PORTABLE CLASSROOM

BUILDINGS TO BE REMOVED
NOTES:
• USED BY THE SANTA CRUZ OFFICE OF EDUCATION

TRANSITION PROGRAM, WHICH WILL MOVE OUT BY
JUNE, 2025.
• THESE BUILDINGS WILL BE REMOVED FROM THE
PROPERTY.

ARCHITECTURAL SITE PLAN LEGEND

PUBLIC FRONTAGE PARALLEL TO SWIFT STREET

PUBLIC FRONTAGE PARALLEL TO (N) PUBLIC ACCESS EASEMENT

TENANT SITE ENTRY POINTS AT SECURE FENCELINE, SEE LANDSCAPE DWGS

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:57:28 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt As indicated
A0.12

SITE PLAN

SCCS EDUCATOR

HOUSING
ZG
23132
A0.12 SCALE: 1" = 30'-0"
1 SITE PLAN - ARCH
N
FORMAL APP BACKCHECK 08.30.2024
FORMAL APP BACKCHECK 2 11.01.2024

22.56 LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"

SWIFT STREET DERBY PARK
(E) BLDG
2 A0.13
T.O. PARAPET
EL +46' - 0"
243' - 11 7/8"

EAST WING (SOUTH)
126' - 8 3/4"

EAST WING
69' - 4 1/4"

COURTYARD

OBLIQUE

WEST WING

OBLIQUE
14' - 9 5/8"

PROPERTY LINEPROPERTY LINE
T.O. PARAPET
46' - 0"

MIDPOINT OF SLOPED ROOF
50' - 0"
35' - 0"

45.0°

NEIGHBORHOOD

TRANSITION PLANE

HEIGHT LIMIT
50' - 0"
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
1 A0.13
ADJ (E) BLDG.

DELAWARE STREET GATEWAY SCHOOL
T.O. PARAPET
EL +46' - 0"

EAST/WEST PUBLIC ACCESS EASEMENT,

SEE CIVIL & LANDSCAPE DWGS

PROPERTY LINEPROPERTY LINE
19' - 1 5/8" 166' - 2 1/8" 83' - 5 1/8"
T.O. ELEVATOR OVERRUN
51' - 0"
35' - 0"

45.0°

NEIGHBORHOOD

TRANSITION PLANE

HEIGHT LIMIT
50' - 0"

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:57:30 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1" = 20'-0"
A0.13

SITE SECTIONS

SCCS EDUCATOR

HOUSING
BK
23132
A0.13 SCALE: 1" = 20'-0"
1 E-W SITE SECTION
A0.13 SCALE: 1" = 20'-0"
2 N-S SITE SECTION
FORMAL APP BACKCHECK 08.30.2024
FORMAL APP BACKCHECK 2 11.01.2024

22.57 7"/8"/4" ACER 11" PINUS

16.5" SEQUOIA
17" SEQUOIA

16.5" SEQUOIA
20" SEQUOIA
X
X
X
X
X
X
XX
XX
X
X
21' - 1" 25' - 5"
38' - 3" 23' - 9"
46' - 6"
19' - 6 1/2"

RECEPTION
STOR
STOR

OFFICE OFFICE
OFFICE
OFFICE
OFFICE
STOR

COMMUNITY ROOM

COMMUNITY
ROOM

COMMUNAL

KITCHEN

RESTROOMS

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:57:31 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A0.14
(E) BUILDING

FLOOR PLAN (FOR

REFERENCE)

SCCS EDUCATOR

HOUSING
Author
23132
A0.14 SCALE: 1/8" = 1'-0" 1 LEVEL 1 - (E) BUILDINGS
FORMAL APP BACKCHECK 2 11.01.2024

22.58 7"/8"/4" ACER
11" PINUS

16.5" SEQUOIA
17" SEQUOIA

16.5" SEQUOIA
20" SEQUOIA
X

X X X X X

X X X X X
X
(E) RESTROOMS TO REMAIN - 387 SF
BALANCE OF (E) SPACES CONVERTED TO STORAGE USE - 2,921 SF (E) OFFICE (BUSINESS) USE TO REMAIN - 2,077 SF

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:57:32 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A0.15
(E) BUILDING

FLOOR PLAN -

PROPOSED USE

SCCS EDUCATOR

HOUSING
Author
23132
FORMAL APP BACKCHECK 2 11.01.2024
A0.15 SCALE: 1/8" = 1'-0"
1 LEVEL 1 - (E) BUILDINGS - PROPOSED USE

22.59 PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:57:48 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 12" = 1'-0"
A0.21

AXONOMETRIC
VIEWS

SCCS EDUCATOR

HOUSING
Author
23132
A0.21 SCALE: 1 AXONOMETRIC - FROM NE
A0.21 SCALE: 2 AXONOMETRIC - FROM SW

22.60 MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4
2 A0.13
2 BR - (2A.1)
115
1 BR - (1A)
117
3 BR - (3A)
151
1 BR - (1B)
113
1 BR - (1B)
111
1 BR - (1B)
109
2 BR - (2A)
106

COMMUNITY ROOM
1 BR-MOB 102
147
2 BR - (2A)
144
2 BR - (2A)
146
2 BR - (2A)
148
2 BR - (2A)
150
STU
153
3 BR - (3A)
155
TRASH
T-1

BIKE RM
140
2 BR - (2A)
108
ELEC
145
JAN
141
E-CE-D
E-1
W-D
W-1
E-1.4
E-2
E-3
E-4
E-5
E-6.3E
-A.0E-AE-B
W-C
W-B
W-A
E-2.1
E-2.2
E-3.1
E-3.2
E-5.1
W-2
W-3.1
W-3
W-4
W-5
W-6
W-7
W-3.2
W-5.1
W-5.2
W-5.3
W-7.1
W1.1
W1.2

LAUNDRY RM
107

EXTERIOR CORRIDOR

EXTERIOR PATIO W/
DECORATIVE PAVERS, TYP.

PACKAGE RM
103
WC
104
MPOE
143
IDF
142

BREEZEWAY

BREEZEWAY

STU-MOB
149

BIKE RM
110
ELEC
129
2 BR - (2A.1)
119
1 BR - (1C)
121
2 BR - (2A.1)
123
2 BR - (2A.1)
116
2 BR - (2A.1)
114
1 BR - (1C)
112
JAN
105
E-D.1E-EE-FE-GE-H
E-E.5E-F.5E-G.5E-H.5
E-3.6 E-6 E-6.1
E-1.2
E-7
E-1.1
E-6.2
E-1.5
W-A.0
W-D.1
E-3.5
A2.11AA2.11B
A2.11AA2.11B
IDF
125
MEP
127
ELEV
E1-1

EXTERIOR CORRIDOR

LOBBY/MAIL
101

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:57:52 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt As indicated
A2.01

FLOOR PLAN -
LEVEL 1

SCCS EDUCATOR

HOUSING
Author
23132
A2.01 SCALE: 1/16" = 1'-0" 1 LEVEL 1

22.61 MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4
2 A0.13
3 BR-MOB
245
2 BR - (2A.1)
213
1 BR - (1B)
211
1 BR - (1B)
209
1 BR - (1B)
207
2 BR-MOB
202
1 BR - (1A)
215
2 BR - (2A)
246
3 BR -(3A)
247
2 BR - (2A)
248
2 BR - (2A)
250
2 BR - (2A)
244
3 BR - (3B)
251
2 BR - 2B
201

E-C E-D
E-1
W-D
W-1
E-1.4
E-2
E-3
E-4
E-5
E-6.3
E-A.0 E-A E-B
W-C
W-B
W-A
E-2.1
E-2.2
E-3.1
E-3.2
E-5.1
W-2
W-3.1
W-3
W-4
W-5
W-6
W-7
W-3.2
W-5.1
W-5.2
W-5.3
W-7.1
W1.1
W1.2
STU
243
1 BR - (1A)
240

ELEVATED WALKWAY
BRIDGE
LOUNGE
205
2 BR-MOB
204
TRASH
T-2
IDF
223
STU
249

EXTERIOR CORRIDOR
STU
208
2 BR - (2A)
206
2 BR - (2A.1)
217
2 BR - (2A.1)
221
2 BR - (2A.1)
214
1 BR - (1C)
210
IDF
242
2 BR - (2A.1)
212
1 BR - (1C)
219

ELEVATED

WALKWAY
BRIDGE
E-D.1 E-E E-F E-G E-H
E-E.5 E-F.5 E-G.5 E-H.5
E-3.6
E-6
E-6.1
E-1.2
E-7
E-1.1
E-6.2
E-1.5
W-A.0
W-D.1
E-3.5
A2.12AA2.12B
A2.12AA2.12B
JAN
203
MEP
227
MEP
225
ELEV
E1-2

EXTERIOR CORREDOR

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:57:56 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt As indicated
A2.02

FLOOR PLAN -
LEVEL 2

SCCS EDUCATOR

HOUSING
Author
23132
A2.02 SCALE: 1/16" = 1'-0"
1 LEVEL 2

22.62 MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4
2 A0.13
3 BR - (3B)
351
2 BR - (2A)
344
2 BR - (2A)
346
2 BR - (2A)
348
2 BR - (2A)
350
LOUNGE
305
E-CE-D
E-1
W-D
W-1
E-1.4
E-2
E-3
E-4
E-5
E-6.3E
-A.0E-AE-B
W-C
W-B
W-A
E-2.1
E-2.2
E-3.1
E-3.2
E-5.1
W-2
W-3.1
W-3
W-4
W-5
W-6
W-7
W-3.2
W-5.1
W-5.2
W-5.3
W-7.1
W1.1
W1.2

SEISMIC JT

ELEVATED

WALKWAY BRIDGE
1 BR - (1A)
340
JAN
303
TRASH
T-3
3 BR - (3A)
345
3 BR - (3A)
347
STU
343
2 BR - 2B
301
2 BR - (2A)
302
2 BR - (2A)
304
2 BR - (2A)
306
1 BR - (1A)
315
2 BR - (2A.1)
313
1 BR - (1B)
311
1 BR - (1B)
309
1 BR - (1B)
307
2 BR - (2A.1)
317
1 BR - (1C)
319
2 BR - (2A.1)
321
1 BR - (1C)
310
2 BR - (2A.1)
312
2 BR - (2A.1)
314
E-D.1E-EE-FE-GE-H
E-E.5E-F.5E-G.5E-H.5
E-3.6 E-6 E-6.1
E-1.2
E-7
E-1.1
E-6.2
E-1.5
W-A.0
W-D.1
E-3.5
A2.13AA2.13B
A2.13AA2.13B
IDF
323
STU
308
IDF
342
STU
349
MEP
325

EXTERIOR CORRIDOR

ELEVATED

WALKWAY
BRIDGE
ELEV
E1-3

EXTERIOR CORREDOR
MEP
327

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:00 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt As indicated
A2.03

FLOOR PLAN -
LEVEL 3

SCCS EDUCATOR

HOUSING
Author
23132
A2.03 SCALE: 1/16" = 1'-0" 1 LEVEL 3

22.63 MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4
2 A0.13
2 BR - (2A)
446
2 BR - (2A)
448
2 BR - (2A)
450
3 BR - (3B)
451
TRASH
T-4
E-CE-D
E-1
W-D
W-1
E-1.4
E-2
E-3
E-4
E-5
E-6.3E
-A.0E-AE-B
W-C
W-B
W-A
E-2.1
E-2.2
E-3.1
E-3.2
E-5.1
W-2
W-3.1
W-3
W-4
W-5
W-6
W-7
W-3.2
W-5.1
W-5.2
W-5.3
W-7.1
W1.1
W1.2

ELEVATED

WALKWAY BRIDGE
JAN
246
1 BR - (1A)
440
3 BR - (3A)
447
STU
449
3 BR -(3A)
445
STU
443
2 BR - (2A)
444
2 BR - 2B
401 2 BR - (2A)
402
2 BR - (2A)
404
2 BR - (2A)
406
STU
308
1 BR - (1B)
407
1 BR - (1B)
409
1 BR - (1B)
411
2 BR - (2A.1)
413
1 BR - (1C)
410
1 BR - (1C)
419
1 BR - (1A)
415
2 BR - (2A.1)
421
2 BR - (2A.1)
414
2 BR - (2A.1)
412
2 BR - (2A.1)
417
IDF
442
LOUNGE
405
E-D.1E-EE-FE-GE-H
E-E.5E-F.5E-G.5E-H.5
E-3.6 E-6 E-6.1
E-1.2
E-7
E-1.1
E-6.2
E-1.5
W-A.0
W-D.1
E-3.5
A2.14AA2.14B
A2.14AA2.14B
IDF
423

EXTERIOR CORRIDOR

ELEVATED

WALKWAY
BRIDGE
ELEV
E1-4

EXTERIOR CORREDOR
MEP
425
MEP
427

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:04 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt As indicated
A2.04

FLOOR PLAN -
LEVEL 4

SCCS EDUCATOR

HOUSING
Author
23132
A2.04 SCALE: 1/16" = 1'-0" 1 LEVEL 4
FORMAL APP BACKCHECK 2 11.01.2024

22.64 FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4
2 A0.13
E-CE-D
E-1
W-D
W-1
E-1.4
E-2
E-3
E-4
E-5
E-6.3
E-A.0E-AE-B
W-C
W-B
W-A
E-2.1
E-2.2
E-3.1
E-3.2
E-5.1
W-2
W-3.1
W-3
W-4
W-5
W-6
W-7
W-3.2
W-5.1
W-5.2
W-5.3
W-7.1
W1.1
W1.2
E-D.1E-EE-FE-GE-H
E-E.5E-F.5E-G.5E-H.5
E-3.6 E-6 E-6.1
E-1.2
E-7
E-1.1
E-6.2
E-1.5
W-A.0
W-D.1
E-3.5
A2.15AA2.15B
A2.15AA2.15B

ROOF PLAN LEGEND

STANDING SEAM METAL ROOFING

FUTURE PHOTOVOLTAIC PANELS BY SEPARATE PERMIT

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:05 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt As indicated
A2.05

ROOF PLAN

SCCS EDUCATOR

HOUSING
BK
23132
A2.05 SCALE: 1/16" = 1'-0" 1 ROOF
FORMAL APP BACKCHECK 08.30.2024

22.65 -
-
A3.03
1 A3.03
2 A3.03
3 W-D
W-1
W-C
W-B
W-A
W-2
W-3.1
W-3
W-4
W-5
W-6
W-7
W-3.2
W-5.1
W-5.2
W-5.3
W-7.1
W1.1
W1.2
A3.04
2 W-A.0
W-D.1
3 BR - (3A)
151
1 BR-MOB
147
2 BR - (2A)
144
2 BR - (2A)
146
2 BR - (2A)
148
2 BR - (2A)
150
STU
153
3 BR - (3A)
155
TRASH
T-1

BIKE RM
140
ELEC
145
JAN
141

EXTERIOR CORRIDOR

EXTERIOR
PATIO, TYP.

MPOE
143
IDF
142

BREEZEWAY

STU-MOB
149

EXTERIOR
PATIO, TYP.

A2.11B A2.11B

SECURITY GATE
AT LEVEL 1

SECURITY GATE
AT LEVEL 1
(28) CLASS 1 BICYCLE PARKING SPACES.

BIKE ROOM IS SECURE AND ACCESSIBLE

ONLY TO RESIDENTS
TYP.
2' - 7"
10' - 4 3/8"
26' - 0 3/4"

BIKE REPAIR STATION
5' - 5"
4' - 2"

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4

MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:09 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A2.11A

SECTOR FLOOR
PLAN - LEVEL 1
WEST

SCCS EDUCATOR

HOUSING
Author
23132
A2.11A SCALE: 1/8" = 1'-0"
1 LEVEL 1 - WEST
FORMAL APP BACKCHECK 08.30.2024

22.66 2- A3.01 -
A3.04
1 A3.01 1
1 A3.21
2 A0.13

E-C E-D
E-1
E-1.4
E-2
E-3
E-4
E-5
E-6.3
E-A.0 E-A E-B
E-2.1
E-2.2
E-3.1
E-3.2
E-5.1
A3.02
5 A3.02
4 6 A3.02
A3.02 7
E-D.1 E-E E-F E-G E-H
E-E.5 E-F.5 E-G.5 E-H.5
E-3.6
E-6
E-6.1
E-1.2
E-7
E-1.1
E-6.2
E-1.5
E-3.5
2 BR - (2A.1)
115
1 BR - (1A)
117
1 BR - (1B)
113
1 BR - (1B)
111
1 BR - (1B)
109
2 BR - (2A)
106

COMMUNITY ROOM
102
2 BR - (2A)
108

LAUNDRY RM
107

EXTERIOR CORREDOR

SECURITY GATE AT
LEVEL 1

EXTERIOR
PATIO, TYP.

PACKAGE RM
103
WC
104

BREEZEWAY

BIKE RM
110
ELEC
129
2 BR - (2A.1)
119
1 BR - (1C)
121
2 BR - (2A.1)
123
2 BR - (2A.1)
116
2 BR - (2A.1)
114
1 BR - (1C)
112
JAN
105
IDF
125
MEP
127
A2.11A A2.11A

SECURITY GATE
AT LEVEL 1

SECURITY GATE
AT LEVEL 1
ELEV
E1-1
(21) CLASS 1 BICYCLE PARKING
SPACES, INCLUDING 5 CARGO
BIKE SPACES. BIKE ROOM IS

SECURE AND ACCESSIBLE ONLY

TO RESIDENTS
3' - 0"
TYP.
10' - 0"

LOBBY/MAIL
101
TYP.
2' - 7"

BIKE REPAIR STATION
8' - 0"
8' - 0"

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4

MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:11 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A2.11B

SECTOR FLOOR
PLAN - LEVEL 1
EAST

SCCS EDUCATOR

HOUSING
Author
23132
A2.11B SCALE: 1/8" = 1'-0"
1 LEVEL 1 - EAST
FORMAL APP BACKCHECK 08.30.2024

22.67 -
-
A3.03
1 A3.03
2 A3.03
3 W-D
W-1
W-C
W-B
W-A
W-2
W-3.1
W-3
W-4
W-5
W-6
W-7
W-3.2
W-5.1
W-5.2
W-5.3
W-7.1
W1.1
W1.2
A3.04
2 W-A.0
W-D.1
3 BR-MOB
245
2 BR - (2A)
246
3 BR -(3A)
247
2 BR - (2A)
248
2 BR - (2A)
250
2 BR - (2A)
244
3 BR - (3B)
251
STU
243
1 BR - (1A)
240

ELEVATED

WALKWAY BRIDGE
TRASH
T-2
STU
249

EXTERIOR CORRIDOR
IDF
242

SEISMIC JT
A2.12B A2.12B

ENTRY CANOPY FOR

EXTERIOR UNIT
ENTRY BELOW, TYP.

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4

MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:15 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A2.12A

SECTOR FLOOR
PLAN - LEVEL 2
WEST

SCCS EDUCATOR

HOUSING
Author
23132
A2.12A SCALE: 1/8" = 1'-0"
1 LEVEL 2 - WEST

22.68 2- A3.01 -
A3.04 1
A3.01
1 1
A3.21
2 A0.13
E-CE-D
E-1
E-1.4
E-2
E-3
E-4
E-5
E-6.3
E-A.0E-AE-B
E-2.1
E-2.2
E-3.1
E-3.2
E-5.1
A3.02 5
A3.02 4
6 A3.02
A3.02
7 E-D.1E-EE-FE-GE-H
E-E.5E-F.5E-G.5E-H.5
E-3.6 E-6 E-6.1
E-1.2 E-7 E-1.1
E-6.2
E-1.5
E-3.5
2 BR - (2A.1)
213
1 BR - (1B)
211
1 BR - (1B)
209
1 BR - (1B)
207
2 BR-MOB
202
1 BR - (1A)
215
2 BR - 2B
201

ELEVATED

WALKWAY BRIDGE
LOUNGE
205
2 BR-MOB
204
IDF
223
STU
208
2 BR - (2A)
206
2 BR - (2A.1)
217
2 BR - (2A.1)
221
2 BR - (2A.1)
214
1 BR - (1C)
210
2 BR - (2A.1)
212
1 BR - (1C)
219

ELEVATED

WALKWAY
BRIDGE
JAN
203
MEP
227
MEP
225
ELEV
E1-2

EXTERIOR CORREDOR
A2.12A A2.12A

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4

MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:17 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A2.12B

SECTOR FLOOR
PLAN - LEVEL 2
EAST

SCCS EDUCATOR

HOUSING
Author
23132
A2.12B SCALE: 1/8" = 1'-0" 1 LEVEL 2 - EAST

22.69 -
-
A3.03
1 A3.03
2 A3.03
3 W-D
W-1
W-C
W-B
W-A
W-2
W-3.1
W-3
W-4
W-5
W-6
W-7
W-3.2
W-5.1
W-5.2
W-5.3
W-7.1
W1.1
W1.2
A3.04
2 W-A.0
W-D.1
3 BR - (3B)
351
2 BR - (2A)
344
2 BR - (2A)
346
2 BR - (2A)
348
2 BR - (2A)
350
1 BR - (1A)
340
TRASH
T-3
3 BR - (3A)
345
3 BR - (3A)
347
STU
343
IDF
342

SEISMIC JT

EXTERIOR CORRIDOR
STU
349

ELEVATED

WALKWAY BRIDGE
A2.13B A2.13B

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4

MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:20 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A2.13A

SECTOR FLOOR
PLAN - LEVEL 3
WEST

SCCS EDUCATOR

HOUSING
Author
23132
A2.13A SCALE: 1/8" = 1'-0" 1 LEVEL 3 - WEST

22.70 2- A3.01 -
A3.04 1
A3.01
1 1
A3.21
2 A0.13
E-CE-D
E-1
E-1.4
E-2
E-3
E-4
E-5
E-6.3
E-A.0E-AE-B
E-2.1
E-2.2E-2.2
E-3.1
E-3.2
E-5.1
A3.02 5
A3.02 4
6 A3.02
A3.02
7 E-D.1E-EE-FE-GE-H
E-E.5E-F.5E-G.5E-H.5
E-3.6 E-6 E-6.1
E-1.2 E-7 E-1.1
E-6.2
E-1.5
E-3.5
LOUNGE
305
JAN
303
2 BR - 2B
301
2 BR - (2A)
302
2 BR - (2A)
304
2 BR - (2A)
306
1 BR - (1A)
315
2 BR - (2A.1)
313
1 BR - (1B)
311
1 BR - (1B)
309
1 BR - (1B)
307
2 BR - (2A.1)
317
1 BR - (1C)
319
2 BR - (2A.1)
321
1 BR - (1C)
310
2 BR - (2A.1)
312 2 BR - (2A.1)
314
ELEV
E1-3
STU
308

ELEVATED

WALKWAY
BRIDGE

EXTERIOR CORREDOR
MEP
325
IDF
323
MEP
327

ELEVATED

WALKWAY BRIDGE
A2.13A A2.13A

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4

MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:23 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A2.13B

SECTOR FLOOR
PLAN - LEVEL 3
EAST

SCCS EDUCATOR

HOUSING
Author
23132
A2.13B SCALE: 1/8" = 1'-0" 1 LEVEL 3 - EAST

22.71 -
-
A3.03
1 A3.03
2 A3.03
3 W-D
W-1
W-C
W-B
W-A
W-2
W-3.1
W-3
W-4
W-5
W-6
W-7
W-3.2
W-5.1
W-5.2
W-5.3
W-7.1
W1.1
W1.2
A3.04
2 W-A.0
W-D.1
2 BR - (2A)
446
2 BR - (2A)
448
2 BR - (2A)
450
3 BR - (3B)
451
TRASH
T-4
1 BR - (1A)
440
3 BR - (3A)
447
STU
449
3 BR -(3A)
445
STU
443
2 BR - (2A)
444
IDF
442

SEISMIC JT

EXTERIOR CORRIDOR

ELEVATED

WALKWAY BRIDGE
A2.14B A2.14B

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4

MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:26 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A2.14A

SECTOR FLOOR
PLAN - LEVEL 4
WEST

SCCS EDUCATOR

HOUSING
Author
23132
A2.14A SCALE: 1/8" = 1'-0" 1 LEVEL 4 - WEST
FORMAL APP BACKCHECK 2 11.01.2024

22.72 2- A3.01 -
A3.04 1
A3.01
1 1
A3.21
2 A0.13
E-CE-D
E-1
E-1.4
E-2
E-3
E-4
E-5
E-6.3
E-A.0E-AE-B
E-2.1
E-2.2
E-3.1
E-3.2
E-5.1
A3.02 5
A3.02 4
6 A3.02
A3.02
7 E-D.1E-EE-FE-GE-H
E-E.5E-F.5E-G.5E-H.5
E-3.6 E-6 E-6.1
E-1.2 E-7 E-1.1
E-6.2
E-1.5
E-3.5
JAN
246
2 BR - 2B
401
2 BR - (2A)
402
2 BR - (2A)
404
2 BR - (2A)
406
STU
308
1 BR - (1B)
407
1 BR - (1B)
409
1 BR - (1B)
411
2 BR - (2A.1)
413
1 BR - (1C)
410
1 BR - (1C)
419
1 BR - (1A)
415
2 BR - (2A.1)
421
2 BR - (2A.1)
414
2 BR - (2A.1)
412
2 BR - (2A.1)
417
LOUNGE
405

ELEVATED

WALKWAY
BRIDGE

EXTERIOR CORREDOR
ELEV
E1-4
IDF
423
MEP
425 MEP
427

ELEVATED

WALKWAY BRIDGE
A2.14A A2.14A

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4

MILLWORK IN PLAN VIEW
808-A
Room Name
Numb ROOM NAME AND NUMBER

DOOR NUMBER

FLOOR PLAN LEGEND

NEW PARTITION AND DOOR

EXISTING TO REMAIN

NOT IN CONTRACT
EQ-1 EQUIPMENT
(E) EXISTING

ACCESSIBLE UNIT

COMMUNICATION UNIT
1-HR RATED WALL

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:28 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A2.14B

SECTOR FLOOR
PLAN - LEVEL 4
EAST

SCCS EDUCATOR

HOUSING
Author
23132
A2.14B SCALE: 1/8" = 1'-0" 1 LEVEL 4 - EAST
FORMAL APP BACKCHECK 2 11.01.2024

22.73 -
-
A3.04
1 A3.03
1 A3.03
2 A3.03
3 1
A3.21
W-D
W-1
W-C
W-B
W-A
W-2
W-3.1
W-3
W-4
W-5
W-6
W-7
W-3.2
W-5.1
W-5.2
W-5.3
W-7.1
W1.1
W1.2
A3.04
2 W-A.0
W-D.1

MEMBRANE ROOFING, SLOPED
TO INTERNAL DRAINS TYP.

ASSUMED LOCATION
FOR PV ARRAY, TYP.
42' - 0"
46' - 0 1/2"
3 1/8" / 1'-0"
STANDING SEEM MTL ROOFING, TYP.

MEMBRANE ROOFING

SLOPED TO DOWNSPOUT
A2.15B A2.15B

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4

ROOF PLAN LEGEND

STANDING SEAM METAL ROOFING

FUTURE PHOTOVOLTAIC PANELS BY SEPARATE PERMIT

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:30 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A2.15A

ROOF PLAN -WEST

SCCS EDUCATOR

HOUSING
Author
23132
A2.15A SCALE: 1/8" = 1'-0"
1 ROOF - WEST
FORMAL APP BACKCHECK 08.30.2024

22.74 2- A3.01 -
A3.04
1 A3.01 1
1 A3.21
2 A0.13

E-C E-D
E-1
E-1.4
E-2
E-3
E-4
E-5
E-6.3
E-A.0 E-A E-B
E-2.1
E-2.2
E-3.1
E-3.2
E-5.1
A3.02
5 A3.02
4 6 A3.02
A3.02 7
E-D.1 E-E E-F E-G E-H
E-E.5 E-F.5 E-G.5 E-H.5
E-3.6
E-6
E-6.1
E-1.2
E-7
E-1.1
E-6.2
E-1.5
E-3.5

MEMBRANE ROOFING, SLOPED
TO INTERNAL DRAINS TYP.

ASSUMED LOCATION
FOR PV ARRAY, TYP.

STANDING SEEM MTL ROOFING, TYP.
42' - 0"
46' - 0 1/2"
2 5/8" / 1'-0"
2 7/8" / 1'-0"

ELEVATOR OVERRUN
A7.11
2 A2.15A A2.15A
51' - 0"

FLOOR PLAN SHEET NOTES

1. FOR GENERAL NOTES APPLICABLE TO ALL DRAWINGS REFER TO THE "PROJECT GENERAL NOTES".

2. FOR ALL (N) INTERIOR ALUMINUM FRAMING AND GLAZING SYSTEM MATCH (E) ANODIZED ALUMINUM, TYP.

3. BASE PROJECT: LEVELS 1 - 3
DENSITY BONUS: LEVEL 4

ROOF PLAN LEGEND

STANDING SEAM METAL ROOFING

FUTURE PHOTOVOLTAIC PANELS BY SEPARATE PERMIT

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:31 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A2.15B

ROOF PLAN - EAST

SCCS EDUCATOR

HOUSING
Author
23132
A2.15B SCALE: 1/8" = 1'-0"
1 ROOF - EAST
FORMAL APP BACKCHECK 08.30.2024

22.75 LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-6.3 E-5.1 E-5 E-4 E-3.2 E-3.1 E-3 E-2.2 E-2.1 E-2 E-1.4 E-1 T.O. PARAPET
EL +46' - 0"
A3.11
1 E-7 E-6 E-1.5 E-1.2 E-1.1

VERTICAL BOARD AND BATTEN

COMPOSITE BOARD STOCK BEYOND,
PAINTED PROJECT BLUE 1, TYP

CEMENT PLASTER, PAINTED

PROJECT WHITE, TYP

ELEVATED WALKWAY/BRIDGE

CEMENT PLASTER, PAINTED
PROJECT BLUE 3

HORIZONTAL LAPPED

COMPOSITE BOARD STOCK,
PAINTED PROJECT BLUE 2,
TYP.

PAINTED GALVANIZED STEEL

GUARDRAILS, PAINT W/ MARINE

GRADE INDUSTRIALIZED COATING

PUBLIC FRONTAGE
123' - 3 3/4"

COMPOSITE BOARD STOCK
WITH EXPOSED FASTENERS.

ALUMINUM WINDOW, KYNAR

FINISH W/ MATCHING

PREFINISHED ALUMINUM
SILL/FLASHING, TYP.

BEHIND BUILDING PASS THRU
37' - 5 5/8"

OPEN CORRIDOR
6' - 4 5/8"
3' - 0" 32' - 6" 10' - 6"
ROOF FORM 7
29' - 7 1/2"
ROOF FORM 6
8' - 9 1/4"
ROOF FORM 5
26' - 2 3/4"
ROOF FORM 4
8' - 9 1/4"
ROOF FORM 3
26' - 2 3/4"
ROOF FORM 2
8' - 9 1/4"
ROOF FORM 1
14' - 11"

GALVANIZED HALLOW
METAL DOORS, TYP.

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY

ALUMINUM ROOFING

FASCIA BEYOND,

PREFINISHED W/ KYNAR

COATING TO MATCH

STANDING SEAM ROOF
CANOPY

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 67%
• VERTICAL BOARD AND BATTEN = 17%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK = 9%
• FLAT PANEL COMPOSITE BOARD STOCK = 3%
• ALUMINUM STOREFRONT = 4%
A3.01
3'-4 3/4" PLANE CHANGE, TYP. @ RECESSES 3

THIS FACADE (SEE UPPER FLOOR PLAN)
3'-4 3/4" PLANE CHANGE, TYP. @ RECESSES

THIS FACADE (SEE UPPER FLOOR PLAN)
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-1 E-1.4 E-2 E-2.1 E-2.2 E-3 E-3.1 E-3.2 E-4 E-5 E-5.1 E-6.3 T.O. PARAPET
EL +46' - 0"
A3.12
1 VERTICAL BOARD AND BATTEN

COMPOSITE BOARD STOCK,
PAINTED PROJECT BLUE 1, TYP

ELEVATED WALKWAY/BRIDGE
E-1.2 E-1.5 E-7

PLASTER COMPOSITE BOARD

STOCK, PAINTED PROJECT WHITE,
TYP.

HORIZONTAL LAPPED COMPOSITE

BOARD STOCK, PAINTED PROJECT
BLUE 2, TYP.

GALVANIZED STEEL GUARDRAILS,

PAINT W/ MARINE GRADE

INDUSTRIALIZED COATING
122' - 0 3/4"

ALUMINUM WINDOW, KYNAR FINISH W/

MATCHING PREFINISHED ALUMINUM
FLASHING, TYP.
31' - 0" 11' - 0" 4' - 0"
21' - 10 1/8" 13' - 5 5/8" 9' - 6 3/8" 13' - 5 5/8" 9' - 6 3/8" 13' - 5 5/8" 21' - 9 5/8" 13' - 2 5/8" 5' - 8 3/4"

ALUMINUM AND GLASS DOOR, KYNAR

FINISH W/ MATCHING PREFINISHED

ALUMINUM FLASHING

ALUMINUM SLOPED STANDING

SEAM METAL ROOF,

PREFINISHED PROJECT GRAY

ALUMINUM ROOFING FASCIA,

PREFINISHED W/ KYNAR

COATING TO MATCH STANDING

SEAM ROOF

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 26%
• VERTICAL BOARD AND BATTEN = 51%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK =23%
• FLAT PANEL COMPOSITE BOARD STOCK = 0%
• ALUMINUM STOREFRONT = 0%
40' - 4 1/2"

OPEN CORRIDOR
8' - 1 1/2"

EXTERIOR ELEVATIONS LEGEND

CEMENT PLASTER, PAINTED, PROJECT WHITE
VERTICAL BOARD AND BATTEN COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 1 HORIZONTAL LAPPED COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 2

STANDING SEAM METAL ROOF, PROJECT GRAY
FLAT PANEL EXPOSED FASTENER COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 2 CEMENT PLASTER, PAINTED PROJECT BLUE 3

EXTERIOR ELEVATIONS NOTES

1. ALLWINDOWS TO BY ALUMINUM, KYNAR FINSIH W/ MATCHING PREFINISHED ALUMINUM SILL/FLASHING, TYP.

2. NO FACADE TO HAVE MORE THAN 85% OF A SINGLE MATERIAL

3. ALL EXTERIOR MATERIALS TO WRAP CORNERS TO A MINUMUM DEPTH OF 4'

4. ALL EXTERIOR GLAZING TO INCLUDE BIRD SAFING FRIT TREATMENT TO CONFORM

TO BIRD-SAFING BUILDING DESIGN STANDARDS (CITY OF SANTA CRUZ) LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-1
T.O. PARAPET
EL +46' - 0"

GALVANIZED STEEL TRELLIS CANOPY
E-1.2 E-1.1

SIGNAGE, PAINTED PROJECT RED

BOARD AND BATTEN

COMPOSITE BOARD

STOCK, PAINTED
PROJECT BLUE 1 TYP

ALUMINUM ROOFING

FASCIA, PREFINISHED W/

KYNAR COATING TO

MATCH STANDING SEAM
ROOF

ALUMINUM STOREFRONT, KYNAR

FINISH W/ MATCHING PREFINISHED

ALUMINUM FLASHING, TYP

PUBLIC FRONTAGE
12' - 10 3/8"

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY

ELEVATION MATERIAL RATIOS
REFERENCE 2
A3.01
7' - 3 1/4" 35' - 6" 10' - 6"

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:37 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A3.01

BUILDING

ELEVATIONS -

EAST WING

SCCS EDUCATOR

HOUSING
BK
23132
A3.01 SCALE: 1/8" = 1'-0"
2 EAST WING - EAST ELEVATION
A3.01 SCALE: 1/8" = 1'-0"
1 EAST WING - WEST ELEVATION
A3.01 SCALE: 1/8" = 1'-0"
3 EAST WING - LOBBY ELEVATION
FORMAL APP BACKCHECK 08.30.2024

22.76 EXTERIOR ELEVATIONS LEGEND

CEMENT PLASTER, PAINTED, PROJECT WHITE
VERTICAL BOARD AND BATTEN COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 1 HORIZONTAL LAPPED COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 2

STANDING SEAM METAL ROOF, PROJECT GRAY
FLAT PANEL EXPOSED FASTENER COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 2 CEMENT PLASTER, PAINTED PROJECT BLUE 3

EXTERIOR ELEVATIONS NOTES

1. ALLWINDOWS TO BY ALUMINUM, KYNAR FINSIH W/ MATCHING PREFINISHED ALUMINUM SILL/FLASHING, TYP.

2. NO FACADE TO HAVE MORE THAN 85% OF A SINGLE MATERIAL

3. ALL EXTERIOR MATERIALS TO WRAP CORNERS TO A MINUMUM DEPTH OF 4'

4. ALL EXTERIOR GLAZING TO INCLUDE BIRD SAFING FRIT TREATMENT TO CONFORM

TO BIRD-SAFING BUILDING DESIGN STANDARDS (CITY OF SANTA CRUZ) LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-A.0 E-A E-B E-C E-D
T.O. PARAPET
EL +46' - 0"
E-D.1 E-E E-E.5 E-F E-F.5 E-G E-G.5 E-H E-H.5
ELEVATED WALKWAY.BRIDGE

CEMENT PLASTER, PAINTED
PROJECT WHITE, TYP.

VERTICAL BOARD AND BATTEN

COMPOSITE BOARD STOCK,
PAINTED PROJECT BLUE 1, TYP

CEMENT PLASTER, PAINTED
PROJECT BLUE 3

GALVANIZED STEEL CANOPY

HORIZONTAL LAPPED

COMPOSITE BOARD STOCK

PANELS, PAINTED PROJECT
BLUE TYPE 3, TYP
2' - 1"

PUBLIC FRONTAGE
178' - 11 1/2"

GALVANIZED STEEL GUARDRAILS,

PAINT W/ MARINE GRADE

INDUSTRIALIZED COATING
ROOF FORM 1
13' - 5 3/4"
ROOF FORM 2
13' - 8 1/4"
ROOF FORM 3
8' - 9 1/4"
ROOF FORM 4
26' - 0 7/8"
ROOF FORM 5
11' - 10 1/4"
ROOF FORM 6
13' - 7 3/4"
ROOF FORM 7
8' - 9 1/4"
ROOF FORM 8
14' - 0 3/8"

OPEN CORRIDOR
13' - 2"
ROOF FORM 9
27' - 5 1/4"

OPEN CORRIDOR
12' - 6"
ROOF FORM 10
29' - 11 1/4"

ALUMINUM WINDOW, KYNAR

FINISH W/ MATCHING

PREFINISHED ALUMINUM
SILL/FLASHING,TYP.

ALUMINUM ROOFING FASCIA,

PREFINISHED W/ KYNAR

COATING TO MATCH

STANDING SEAM ROOF

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 65%
• VERTICAL BOARD AND BATTEN = 20%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK =15%
• FLAT PANEL COMPOSITE BOARD STOCK = 0%
• ALUMINUM STOREFRONT = 0%
3' - 0" 1' - 0" 31' - 0" 11' - 0"
3'-4 3/4" PLANE CHANGE, TYP. @ RECESSES

THIS FACADE (SEE UPPER FLOOR PLAN)
6'-4 3/4" PLANE CHANGE @ BOARD
& BATTEN FACADE (SEE PLAN)
3'-4 3/4" PLANE CHANGE, TYP. @ RECESSES

THIS FACADE (SEE UPPER FLOOR PLAN)
3'-4 3/4" PLANE CHANGE, TYP. @ RECESSES

THIS FACADE (SEE UPPER FLOOR PLAN)
53' - 3 3/8" TO HIGH POINT OF SLOPED ROOF
49' - 7 7/8" TO MIDPOINT OF SLOPED ROOF
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-D
T.O. PARAPET
EL +46' - 0"
E-H.5 E-H E-G.5 E-G E-F.5E-F E-E.5 E-E E-D.1
100' - 0"

VERTICAL BOARD AND BATTEN

COMPOSITE BOARD STOCK, PAINTED
PROJECT BLUE 1, TYP

CEMENT PLASTER, PAINTED

PROJECT WHITE, TYP

HORIZONTAL LAPPED

COMPOSITE BOARD STOCK,
PAINTED PROJECT BLUE 2,
TYP.

ALUMINUM WINDOW, TYP.
13' - 9 1/2" 21' - 9 5/8" 13' - 2 3/8"
11' - 0" 31' - 0" 3' - 0 3/8"

ALUMINUM SLOPED STANDING

SEAM METAL ROOF,

PREFINISHED PROJECT GRAY

ALUMINUM ROOFING FASCIA,

PREFINISHED W/ KYNAR COATING

TO MATCH STANDING SEAM ROOF
CANOPY

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 31%
• VERTICAL BOARD AND BATTEN = 41%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK =28%
• FLAT PANEL COMPOSITE BOARD STOCK = 0%
• ALUMINUM STOREFRONT = 0%
13' - 2 3/8" 21' - 9 5/8"
3' - 3"
12' - 11 1/2"

OPEN PASS THROUGH
26' - 8 3/4"
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-6.3 E-5 E-4
T.O. PARAPET
EL +46' - 0"
E-7 E-6.2 E-6.1 E-6 E-3.6 E-3.5
ELEVATED WALKWAY.BRIDGE

CEMENT PLASTER, PAINTED
PROJECT WHITE, TYP.

VERTICAL BOARD AND BATTEN

COMPOSITE BOARD STOCK,
PAINTED PROJECT BLUE 1, TYP

CEMENT PLASTER,
PAINTED BLUE 3

GALVANIZED STEEL GUARDRAILS,

PAINT W/ MARINE GRADE

INDUSTRIALIZED COATING
3' - 4 3/4"

PUBLIC FRONTAGE
65' - 3 1/8" 2' - 5 7/8"
ALUMINUM WINDOW, TYP.
4' - 0" 31' - 0" 11' - 0"
ROOF FORM 3
32' - 9 1/4"
ROOF FORM 2
6' - 0"
ROOF FORM 1
29' - 10 5/8"

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 49%
• VERTICAL BOARD AND BATTEN = 48%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK = 3%
• FLAT PANEL COMPOSITE BOARD STOCK = 0%
• ALUMINUM STOREFRONT = 0%

GALVANIZED STEEL FENCE

PAINT W/ MARINE GRADE

INDUSTRIALIZED COATING
13'-5 3/4" PLANE CHANGE @ CEMENT

PLASTER FACADE (SEE PLAN)

ANGLED WALL
(SEE PLAN)
OPEN

CORRIDOR
48' - 7 7/8" TO MIDPOINT OF SLOPED ROOF
52' - 3 3/8" TO HIGH POINT OF SLOPED ROOF
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
T.O. PARAPET
EL +46' - 0"
E-3.5 E-3.6 E-6 E-6.1 E-6.2
ELEVATED WALKWAY.BRIDGE

CEMENT PLASTER, PAINTED
PROJECT WHITE, TYP.

VERTICAL BOARD AND BATTEN

COMPOSITE BOARD STOCK,
PAINTED PROJECT BLUE 1, TYP

CEMENT PLASTER,
PAINTED BLUE 3
CANOPY

HORIZONTAL LAPPED

COMPOSITE BOARD STOCK

PANELS, PAINTED PROJECT
BLUE TYPE 3, TYP

PAINTED GALVANIZED STEEL

GUARDRAILS, MARINE GRADE
2' - 5 7/8" 65' - 3 1/8" 3' - 4 3/4"
ALUMINUM WINDOW, TYP.

ALUMINUM ROOFING

FASCIA, PREFINISHED W/

KYNAR COATING TO

MATCH STANDING SEAM
ROOF

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 50%
• VERTICAL BOARD AND BATTEN = 48%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK = 2%
• FLAT PANEL COMPOSITE BOARD STOCK = 0%
• ALUMINUM STOREFRONT = 0%
29' - 10 5/8"

OPEN CORRIDOR
6' - 0" 32' - 9 1/4"
35' - 0 1/2" 11' - 0"
48' - 7 7/8" TO MIDPOINT OF SLOPED ROOF
52' - 3 3/8" TO HIGH POINT OF SLOPED ROOF

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:45 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A3.02

BUILDING

ELEVATIONS -

EAST WING

SCCS EDUCATOR

HOUSING
BK
23132
A3.02 SCALE: 1/8" = 1'-0"
4 L-WING SOUTH ELEVATION
A3.02 SCALE: 1/8" = 1'-0"
5 L-WING NORTH ELEVATION
A3.02 SCALE: 1/8" = 1'-0"
6 L-WING EAST ELEVATION
A3.02 SCALE: 1/8" = 1'-0"
7 L-WING WEST ELEVATION
FORMAL APP BACKCHECK 08.30.2024

22.77 EXTERIOR ELEVATIONS LEGEND

CEMENT PLASTER, PAINTED, PROJECT WHITE
VERTICAL BOARD AND BATTEN COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 1 HORIZONTAL LAPPED COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 2

STANDING SEAM METAL ROOF, PROJECT GRAY
FLAT PANEL EXPOSED FASTENER COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 2 CEMENT PLASTER, PAINTED PROJECT BLUE 3

EXTERIOR ELEVATIONS NOTES

1. ALLWINDOWS TO BY ALUMINUM, KYNAR FINSIH W/ MATCHING PREFINISHED ALUMINUM SILL/FLASHING, TYP.

2. NO FACADE TO HAVE MORE THAN 85% OF A SINGLE MATERIAL

3. ALL EXTERIOR MATERIALS TO WRAP CORNERS TO A MINUMUM DEPTH OF 4'

4. ALL EXTERIOR GLAZING TO INCLUDE BIRD SAFING FRIT TREATMENT TO CONFORM

TO BIRD-SAFING BUILDING DESIGN STANDARDS (CITY OF SANTA CRUZ) LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"

W-A W-B W-C W-D
T.O. PARAPET
EL +46' - 0"

CEMENT PLASTER, PAINTED
PROJECT BLUE 3, TYP

PTD CEMENT PLASTER, PAINTED

PROJECT WHITE, TYP

BOARD AND BATTEN

COMPOSITE BOARD STOCK,
PAINTED PROJECT BLUE 1,
TYP
W-A.0 W-D.1
CANOPY

GALVANIZED STEEL GUARDRAILS,

PAINT W/ MARINE GRADE

INDUSTRIALIZED COATING

ELEVATED WALKWAY

LAPPED COMPOSITE BOARD STOCK
PANELS, PAINTED PROJECT BLUE 2

PUBLIC FRONTAGE
63' - 7 1/8" 2' - 5 7/8"

TO MIDPOINT OF SLOPED ROOF
49' - 7 7/8"
ROOF FORM 3
30' - 5 1/4"
ROOF FORM 2
6' - 0"
ROOF FORM 1
27' - 6 5/8"

ALUMINUM WINDOWS, KYNAR

FINISH W/ MATCHING

PREFINISHED ALUMINUM
SILL/FLASHING, TYP.

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 50%
• VERTICAL BOARD AND BATTEN = 47%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK = 3%
• FLAT PANEL COMPOSITE BOARD STOCK = 0%
• ALUMINUM STOREFRONT = 0%
6'-7 3/4" PLANE CHANGE/RECESS @

BOARD & BATTEN FACADE (SEE PLAN)
OPEN
ANGLED WALL, L2-4 CORRIDOR
(SEE PLAN)

TO HIGH POINT OF SLOPED ROOF
53' - 3 3/8"
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
W-1 W-2 W-3 W-3.1 W-3.2 W-4 W-5 W-5.1 W-5.2 W-5.3 W-6 W-7 W-7.1 T.O. PARAPET
EL +46' - 0"
W1.1 W1.2

CEMENT PLASTER, PAINTED

PROJECT WHITE, TYP

LAPPED COMPOSITE BOARD

STOCK, PAINTED PROJECT BLUE
2, TYP

CEMENT PLASTER, PAINTED
PROJECT BLUE 3, TYP

EGRESS STAIR BEYOND

BOARD AND BATTEN

COMPOSITE BOARD STOCK

BEYOND, PAINTED PROJECT
BLUE 1, TYP
181' - 0 1/2" 5' - 0 1/8"

FLAT PANEL EXPOSED

FASTENER COMPOSITE

BOARD STOCK, PAINTED
PROJEDCT BLUE 2
3' - 0" 1' - 0" 31' - 0" 11' - 0"

ALUMINUM WINDOWS, KYNAR

FINISH W/ MATCHING

PREFINISHED ALUMINUM
SILL/FLASHING,TYP.
29' - 4 3/4" 20' - 6" 25' - 11" 20' - 2 3/4" 29' - 7 1/4" 9' - 0" 24' - 2 7/8" 9' - 3 3/8" 18' - 3 1/2" 1' - 1"

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY
CANOPY

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 69%
• VERTICAL BOARD AND BATTEN = 0%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK = 22%
• FLAT PANEL COMPOSITE BOARD STOCK = 9%
• ALUMINUM STOREFRONT = 0%
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
W-7.1 W-7 W-6 W-5 W-4 W-3.2 W-3.1 W-3 W-2 W-1
T.O. PARAPET
EL +46' - 0"
W1.2

BOARD AND BATTEN

COMPOSITE BOARD

STOCK, PAINTED
PROJECT BLUE 1 TYP

CEMENT PLASTER, PAINTED

PROJECT WHITE, TYP

LAPPED COMPOSITE BOARD

STOCK, PAINTED PROJECT
BLUE 3 TYP

ELEVATED WALKWAY/BRIDGE W/

GALVANIZED STEEL GUARDRAILS,

PAINT W/ MARINE GRADE

INDUSTRIALIZED COATING
188' - 8 3/8"
13' - 7" 21' - 9 5/8" 13' - 2 3/8" 21' - 9 5/8" 13' - 0 1/4" 21' - 11 3/4" 13' - 2 3/8" 21' - 9 1/8"

OPEN CORRIDOR
18' - 1 1/8" 30' - 3 1/8"

ALUMINUM WINDOWS, KYNAR

FINISH W/ MATCHING

PREFINISHED ALUMINUM
SILL/FLASHING,, TYP.
11' - 0" 31' - 0" 4' - 0"

ALUMINUM SLOPED STANDING

SEAM METAL ROOF,

PREFINISHED PROJECT GRAY

ALUMINUM ROOFING

FASCIA, PREFINISHED W/

KYNAR COATING TO

MATCH STANDING SEAM
ROOF
CANOPY

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 33%
• VERTICAL BOARD AND BATTEN = 48%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK = 19%
• FLAT PANEL COMPOSITE BOARD STOCK = 0%
• ALUMINUM STOREFRONT = 0%
A3.03 SCALE: 1/8" = 1'-0"
1 WEST WING - SOUTH ELEVATION
A3.03 SCALE: 1/8" = 1'-0"
2 WEST WING - NORTHWEST ELEVATION
A3.03 SCALE: 1/8" = 1'-0"
3 WEST WING - SOUTHEAST ELEVATION

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:51 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A3.03

BUILDING

ELEVATIONS -

WEST WING

SCCS EDUCATOR

HOUSING
BK
23132
FORMAL APP BACKCHECK 08.30.2024

22.78 LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-D E-C E-B E-EA-A.0
T.O. PARAPET
EL +46' - 0"

ALUMINUM STOREFRONT, KYNAR

FINISH W/ MATCHING

PREFINISHED ALUMINUM

FLASHING, TYP

BOARD AND BATTEN COMPOSITE

BOARD STOCK, PAINTED PROJECT
BLUE 1, TYP

CEMENT PLASTER, PAINTED

PROJECT WHITE, TYP

ELEVATOR PENTHOUSE

BEYOND, BOARD AND

BATTEN COMPOSITE BOARD
STOCK

METAL TRELLIS CANOPY
E-D.1
69' - 4 1/4"

CEMENT PLASTER, PAINTED
PROJECT BLUE 3, TYP

GALVINIZED STEEL

GUARDRAILS, PAINT W/

MARINE GRADE

INDUSTRIALIZED COATING

ALUMINUM WINDOW, KYNAR

FINISH W/ MATCHING

PREFINISHED ALUMINUM

SILL/FLASHING, TYP

ALUMINUM ROOFING FASCIA,

PREFINISHED W/ KYNAR

COATING TO MATCH

STANDING SEAM ROOF

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 56%
• VERTICAL BOARD AND BATTEN = 34%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK = 0%
• FLAT PANEL COMPOSITE BOARD STOCK = 0%
• ALUMINUM STOREFRONT = 10%

MAX TO MIDPOINT OF SLOPED ROOF
49' - 7 7/8"
32' - 11"

OPEN CORRIDOR
6' - 0"30' - 5"
ANGLED WALL, L2-4
(SEE PLAN)

TO HIGH POINT OF SLOPED ROOF
53' - 3 3/8"
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"

W-D W-C W-B W-A
T.O. PARAPET
EL +46' - 0"

CEMENT PLASTER, PAINTED
PROJECT WHITE, TYP.

CEMENT PLASTER, PAINTED
PROJECT BLUE 3,TYP

BOARD AND BATTEN

COMPOSITE BOARD STOCK,
PAINTED PROJECT BLUE 1
TYP
49' - 7 7/8" TO MIDPOINT OF SLOPED ROOF
W-D.1 W-A.0
60' - 7 1/8" 3' - 4 3/4"

ELEVATED WALKWAY

GALVINIZED STEEL

GUARDRAILS, PAINT W/

MARINE GRADE

INDUSTRIALIZED COATING

ALUMINUM WINDOWS, KYNAR

FINISH W/ MATCHING

PREFINISHED ALUMINUM
SILL/FLASHING, TYP.

ROOF FORM 1
27' - 0 1/2"

OPEN CORRIDOR
6' - 0"
ROOF FORM 2
27' - 6 5/8"
11' - 0" 35' - 0 1/2"

ALUMINUM ROOFING FASCIA,

PREFINISHED W/ KYNAR

COATING TO MATCH

STANDING SEAM ROOF

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY

ELEVATION MATERIAL RATIOS
• CEMENT PLASTER = 52%
• VERTICAL BOARD AND BATTEN = 48%
• HORIZONTAL LAPPED COMPOSITE BOARD STOCK = 0%
• FLAT PANEL COMPOSITE BOARD STOCK = 0%
• ALUMINUM STOREFRONT = 0%

ANGLED WALL (SEE PLAN)
53' - 3 3/8" TO HIGH POINT OF SLOPED ROOF

EXTERIOR ELEVATIONS LEGEND

CEMENT PLASTER, PAINTED, PROJECT WHITE
VERTICAL BOARD AND BATTEN COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 1 HORIZONTAL LAPPED COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 2

STANDING SEAM METAL ROOF, PROJECT GRAY
FLAT PANEL EXPOSED FASTENER COMPOSITE BOARD STOCK, PAINTED PROJECT BLUE 2 CEMENT PLASTER, PAINTED PROJECT BLUE 3

EXTERIOR ELEVATIONS NOTES

1. ALLWINDOWS TO BY ALUMINUM, KYNAR FINSIH W/ MATCHING PREFINISHED ALUMINUM SILL/FLASHING, TYP.

2. NO FACADE TO HAVE MORE THAN 85% OF A SINGLE MATERIAL

3. ALL EXTERIOR MATERIALS TO WRAP CORNERS TO A MINUMUM DEPTH OF 4'

4. ALL EXTERIOR GLAZING TO INCLUDE BIRD SAFING FRIT TREATMENT TO CONFORM

TO BIRD-SAFING BUILDING DESIGN STANDARDS (CITY OF SANTA CRUZ) A3.04 SCALE: 1/8" = 1'-0"
1 EAST WING - NORTH ELEVATION
A3.04 SCALE: 1/8" = 1'-0"
2 WEST WING - NORTH ELEVATION

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:58:58 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A3.04

BUILDING

ELEVATIONS

SCCS EDUCATOR

HOUSING
BK
23132
FORMAL APP BACKCHECK 08.30.2024

22.79 LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-3.1 E-3 E-2.2
T.O. PARAPET
EL +46' - 0"
2 A3.11

CEMENT PLASTER, TYP,
PAINTED PROJECT BLUE 3

LAPPED COMPOSITE BOARD

STOCK, TYP, PAINTED
PROJECT BLUE 2

CEMENT PLASTER, TYP,

PAINTED PROJECT WHITE

BOARD AND BATTEN,
PAINTED PROJECT BLUE 1
3 A3.11

ALUMINUM WINDOW, KYNAR

FINISH W/ MATCHING

PREFINISHED ALUMINUM

SILL/FLASHING, TYP

COMPOSITE BOARD STOCK

W/ EXPOSED FASTENERS
PAINTED PROJECT BLUE 2.

ALUMINUM ROOFING

FASCIA, PREFINISHED W/

KYNAR COATING TO MATCH

STANDING SEAM ROOF

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY

GALVANIZED HALLOW METAL

DOOR, TYP

ENTRY CANOPY
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"

E-B E-D
T.O. PARAPET
EL +46' - 0"
E-D.1
RECESSED ALUM. WINDOW , TYP.

ALUMINIM FLASHING,

PREFINISHED TO MATCH

WINDOW FRAME

PVC ROOFING, WHITE,

SLOPE TO DRAIN
4' - 0"
A8.11
9 A8.11
11 A8.11
2 ALUMINUM SLOPED STANDING

SEAM METAL ROOF,

PREFINISHED PROJECT GRAY

ALUMINUM ROOFING FASCIA,

PREFINISHED W/ KYNAR

COATING TO MATCH

STANDING SEAM ROOF

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY

VENTED SOFFIT
A8.51
2 A8.51
2 TYP. RECESS
3' - 4 3/4"
8"
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"

E-B E-D
T.O. PARAPET
EL +46' - 0"
E-D.1

PROVIDE ROOF TIE
OFFS WHERE T.O.

PARAPET IS LESS THAN
3'-6" FROM T.O. ROOF 3' - 0" 1' - 0"

PVC ROOFING, SLOPE TO
DRAIN

ALUMINUM WINDOW, TYP

ALUMINUM WINDOW

FLASHING, PREFINISHED TO

MATCH WINDOW FRAME
A8.11
9 A8.11
10 A8.11
2 A8.11
6 ALUMINUM SLOPED STANDING

SEAM METAL ROOF,

PREFINISHED PROJECT GRAY

ALUMINUM ROOFING FASCIA,

PREFINISHED W/ KYNAR

COATING TO MATCH

STANDING SEAM ROOF

ALUMINUM PARAPET

CAP, PREFINISHED

PROJECT GRAY
A8.51
2 PARAPET BEYOND
A8.51
2 PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:03 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/4" = 1'-0"
A3.11

ENLARGED

BUILDING

ELEVATIONS

SCCS EDUCATOR

HOUSING
BK
23132
A3.11 SCALE: 1/4" = 1'-0"
1 EAST WING - EAST ELEVATION - TYPICAL MODULE
A3.11 SCALE: 1/4" = 1'-0"
2 EAST WING - EAST WALL SECTION @ CEMENT PLASTER
A3.11 SCALE: 1/4" = 1'-0"
3 EAST WING - EAST WALL SECTION @ FIBER CEMENT
FORMAL APP BACKCHECK 08.30.2024

22.80 LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-3.1 E-3.2
T.O. PARAPET
EL +46' - 0"
2 A3.12

BOARD AND BATTEN PANEL, TYP,
PAINTED PROJECT BLUE 1

CEMENT PLASTER,

TYP ,PAINTED PROJECT WHITE
3 A3.12

BOARD AND BATTEN COMPOSITE

BOARD STOCK PANEL, TYP,
PAINTED PROJECT BLUE 1

GALVANIZED HALLOW METAL
DOOR, TYP.

ALUMINUM WINDOW, KYNAR

FINISH W/ MATCHING

PREFINISHED ALUMINUM

SILL/FLASHING, TYP

LAPPED COMPOSITE

BOARD STOCK,

PAINTED PROJECT
BLUE 2

ALUMINUM SLOPED STANDING

SEAM METAL ROOF,

PREFINISHED PROJECT GRAY

ALUMINUM ROOFING FASCIA,

PREFINISHED W/ KYNAR

COATING TO MATCH

STANDING SEAM ROOF

ENTRY CANOPY
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-A.0 E-A
T.O. PARAPET
EL +46' - 0"
ALUM. WINDOWS,
TYP
1' - 0"
A8.11
1 A8.11
10 A8.11
3 ALUMINUM SLOPED STANDING

SEAM METAL ROOF,

PREFINISHED PROJECT GRAY

ALUMINUM ROOFING FASCIA,

PREFINISHED W/ KYNAR

COATING TO MATCH

STANDING SEAM ROOF

ALUMINUM WINDOW

FLASHING, PREFINISHED TO

MATCH WINDOW FRAME
LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
E-A.0 E-A
T.O. PARAPET
EL +46' - 0"

ENTRY CANOPY
RECESSED ALUM.

WINDOWS, TYP
1' - 0"
A8.11
1 A8.11
6 A8.11
3 ALUMINUM SLOPED STANDING

SEAM METAL ROOF,

PREFINISHED PROJECT GRAY

ALUMINUM ROOFING FASCIA,

PREFINISHED W/ KYNAR

COATING TO MATCH

STANDING SEAM ROOF

ALUMINUM SLOPED STANDING

SEAM METAL ROOF,

PREFINISHED PROJECT GRAY

ALUMINUM WINDOW

FLASHING, PREFINISHED TO

MATCH WINDOW FRAME
4"

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:06 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/4" = 1'-0"
A3.12

ENLARGED

BUILDING

ELEVATIONS

SCCS EDUCATOR

HOUSING
BK
23132
A3.12 SCALE: 1/4" = 1'-0"
1 EAST WING - WEST ELEVATION - TYPICAL MODULE
A3.12 SCALE: 1/4" = 1'-0"
2 EAST WING - WEST WALL SECTION @ CEMENT PLASTER
A3.12 SCALE: 1/4" = 1'-0"
3 EAST WING - WEST WALL SECTION @ FIBER CEMENT
FORMAL APP BACKCHECK 08.30.2024

22.81 LEVEL 1
EL +0' - 0"
LEVEL 2
EL +12' - 0"
LEVEL 3
EL +22' - 0"
LEVEL 4
EL +32' - 0"
ROOF
EL +42' - 0"
12' - 0" 10' - 0" 10' - 0" 10' - 0"
T.O. ROOF
42' - 0" 4' - 0"
2 A0.13
E-DE-CE-BE-AE-A.0
T.O. PARAPET
EL +46' - 0"
1 BR - (1B)
2 BR - (2A) 1 BR - (1B)
2 BR - (2A)
VARIES
E-D.1
49' - 7 7/8" TO MIDPOINT OF SLOPED ROOF
T.O. PARAPET
46' - 0"

LOCATION OF FUTURE

SOLAR PANELS
53' - 3 3/8" TO HIGH POINT OF SLOPED ROOF

W-DW-CW-BW-A
2 BR - (2A) 3 BR - (3A)
2 BR - (2A)
2 BR - (2A) 3 BR -(3A)
W-D.1W-A.0
49' - 7 7/8" TO MIDPOINT OF SLOPED ROOF

LOCATION OF FUTURE

SOLAR PANELS
53' - 3 3/8" TO HIGH POINT OF SLOPED ROOF

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Co
nsultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:08 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/8" = 1'-0"
A3.21

BUILDING SECTION

SCCS EDUCATOR

HOUSING
Author
23132
A3.21 SCALE: 1/8" = 1'-0" 1 E-W BUILDING SECTION
FORMAL APP BACKCHECK 08.30.2024
FORMAL APP BACKCHECK 2 11.01.2024

22.82 W
-D
W-1
W-C
W-2
W1.2

LIVING / DINING

BEDROOM

KITCHEN

TELECOM
CLOSET

TRASH ROOM
26' - 5 1/2" 10' - 10 1/2"
CLOSET

COAT CLOSET

CORRIDOR
W/D
BATH
PANTRY
26' - 6"
W.H.

CLOSET
W-AW-B
W1.1
W1.2

WALK-IN
CLOSET

KITCHEN
BATH

LIVING / DINING / BEDROOM CORRIDOR

COAT CLOSET
PANTRY

RESIDENTIAL UNIT
16' - 4"
W-A.0
3' - 0" 26' - 6"
W.H.

CLOSET
W-D
W-1
W-C
W-2
W1.2

CORRIDOR

BEDROOM LIVING / DINING

KITCHEN

TELECOM
CLOSET

TRASH ROOM
CLOSET

COAT CLOSET
W/D
BATH
PANTRY
W.H.

CLOSET
SOFFIT
FOR

EXHAUST
W-AW-B
W1.1
W1.2
W-A.0

WALK-IN
CLOSET

KITCHEN
BATH

LIVING / DINING / BEDROOM
LINEN

DROP CEILING

AT BATHROOM

DROP CEILING FOR
CLOSET

SOFFIT FOR EXHAUST

SOFFIT FOR EXHAUST

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:10 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/4" = 1'-0"
A4.01

ENLARGED FLOOR

PLANS, RCP -
STUDIO, 1BR

SCCS EDUCATOR

HOUSING
Author
23132
A4.01 SCALE: 1/4" = 1'-0" 2 ENLARGED PLAN - UNIT 1A TYPICAL OF 7A4.01 SCALE: 1/4" = 1'-0" 1 ENLARGED PLAN - UNIT STUDIO TYPICAL OF 10 A4.01 SCALE: 1/4" = 1'-0" 4 ENLARGED RCP - UNIT 1AA4.01 SCALE: 1/4" = 1'-0" 5 ENLARGED RCP - UNIT STUDIO

22.83 E-A.0 E-A E-B
E-3.1
E-3.2
2' - 1" 32' - 4 1/2"

BEDROOM

LIVING / DINING

KITCHEN

WALK-IN

CLOSET BATH
W.H.

CLOSET

RESIDENTIAL UNIT

RESIDENTIAL UNIT

CORRIDOR

PANTRY COAT CLOSET
23' - 0"
W/D

BEDROOM

KITCHEN LIVING /DINING
BATH
W/D

PANTRY CLOSET
28' - 10"
25' - 6"
E-F
E-G
E-6 E-6.1 E-6.2
3' - 0"
COAT
CLOSET
W.H.

CLOSET
E-F
E-G
E-6 E-6.1 E-6.2

BEDROOM

LIVING /DINING

KITCHEN
W/D

PANTRYCLOSET

DROP CEILING BATH

SOFFIT FOR EXHAUST
E-A.0 E-A E-B
E-3.1
E-3.2
E-A.0E-A E-B
E-3.1
E-3.2

BEDROOM

LIVING / DINING KITCHEN

CLOSET BATH
COAT
CLOSET
PANTRY

DROP CEILING

W/D SOFFIT FOR EXHAUST

SOFFIT FOR EXHAUST

PROJECT ADDRESS
313 SWIFT ST
SANTA CRUZ, CA 95060
Stamp
Consultant
Sheet Number
Sheet Title
EHDD Job Number
Drawn by
Scale
Printing Date
100% SCHEMATIC DESIGN 06.14.2024
PIER 1, BAY 2

THE EMBARCADERO
SAN FRANCISCO, CA 94111
[email protected]
+1 415-285-9193
Revisions and Description Date
10/31/2024 10:59:12 AM Autodesk Docs://23132 Santa Cruz Educator Housing/23132-SCCS HOUSING-A-BLDG.rvt 1/4" = 1'-0"
A4.02

ENLARGED FLOOR
PLANS, RCP - 1BR

SCCS EDUCATOR

HOUSING
Author
23132
A4.02 SCALE: 1/4" = 1'-0"
11 ENLARGED PLAN - UNIT 1B - TYP. OF 9
A4.02 SCALE: 1/4" = 1'-0"
1 ENLARGED PLAN - UNIT 1C - TYP. OF 6
A4.02 SCALE: 1/4" = 1'-0"
2 ENLARGED RCP - UNIT 1C
A4.02 SCALE: 1/4" = 1'-0"
4 ENLARGED RCP - UNIT 1B

22.84 W-C W-D
W-4
W-5
35' - 0"

← All documents from this meeting