Cities Index.
Ncil20250924

Santee City Council
September 24, 2025

Document
Ncil20250924
Meeting
September 24, 2025
Body
Santee City Council
Pages
39
Original file
250.4 MB
Text extracted from the city's file for reading and search. Open the original on www.cityofsanteeca.gov. That file is the official record.

NEAR-TERM PLUS PROJECT WITH IMPROVEMENTS TRAFFIC CONDITIONS Generated with Cottonwood and Park
Version 2025 (SP 0-5) TJW Engineering, Inc. Scenario 10: 10 Opening + Project AM improvements Intersection Level Of Service Report
Intersection 5: Magnolia Ave/Park Center Dr
Control Type: Signalized Delay (sec / veh): 15.4
Analysis Method: HCM 7th Edition Level Of Service: B
Analysis Period: 15 minutes Volume to Capacity (v/c): 0.641 Crosswalk Yes No Yes
Curb Present No No No
Grade [%] 0.00 0.00 0.00
Speed [mph] 45.00 45.00 30.00
Exit Pocket Length [ft] 0.00 0.00 0.00 0.00 0.00 0.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 1
Entry Pocket Length [ft] 80.00 100.00 100.00 100.00 100.00 140.00 100.00 No. of Lanes in Entry Pocket 1 0 1 0 1 1 0
Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 Turning Movement Left Thru U-turn Thru Right Left Right Lane Configuration
Approach Northbound Southbound Eastbound
Name Magnolia Avenue Magnolia Avenue Park Center Drive
Intersection Setup
1 8/4/2025
Generated with Cottonwood and Park
Version 2025 (SP 0-5) TJW Engineering, Inc. Scenario 10: 10 Opening + Project AM improvements Bicycle Volume [bicycles/h] 0 0 0
v_ab, Corner Pedestrian Volume [ped/h] 0 0 0
v_ci, Inbound Pedestrian Volume crossing mi 0 0 0
v_co, Outbound Pedestrian Volume crossing 0 0 0
v_di, Inbound Pedestrian Volume crossing m 0 0 0
v_do, Outbound Pedestrian Volume crossing 0 0 0
Local Bus Stopping Rate [/h] 0 0 0 0 0 0 0
On-Street Parking Maneuver Rate [/h] 0 0 0 0 0 0 0
Presence of On-Street Parking No No No No No No
Total Analysis Volume [veh/h] 154 973 9 1194 9 23 305
Total 15-Minute Volume [veh/h] 39 243 2 298 2 6 76
Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Peak Hour Factor 0.9390 0.9390 0.9390 0.9390 0.9390 0.9390 0.9390 Total Hourly Volume [veh/h] 145 914 8 1121 8 22 286
Right Turn on Red Volume [veh/h] 0 0 0 0 0 0 0
Other Volume [veh/h] 0 0 0 0 0 0 0
Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0
Pass-by Trips [veh/h] 0 0 0 0 0 0 0
Diverted Trips [veh/h] 80 0 0 0 0 0 130
Site-Generated Trips [veh/h] 45 13 0 21 4 15 153
In-Process Volume [veh/h] 0 0 0 0 0 0 0
Growth Factor 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 Proportion of CAVs [%] 0.00
Heavy Vehicles Percentage [%] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Base Volume Input [veh/h] 20 883 8 1078 4 7 3
Name Magnolia Avenue Magnolia Avenue Park Center Drive
Volumes
2 8/4/2025
Generated with Cottonwood and Park
Version 2025 (SP 0-5) TJW Engineering, Inc. Scenario 10: 10 Opening + Project AM improvements Lost time [s] 10.00
Permissive Mode SingleBand
Offset Reference Lead Green - Beginning of First Green
Offset [s] 0.0
Actuation Type Fully actuated
Coordination Type Time of Day Pattern Coordinated
Active Pattern Pattern 1
Cycle Length [s] 70
Signal Coordination Group -
Located in CBD No
Intersection Settings
I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Advanced Detector Length [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Advanced Detector Location [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector Length [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector Location [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0
l2, Clearance Lost Time [s] 2.0 2.0 2.0 2.0 0.0 2.0 2.0 l1, Start-Up Lost Time [s] 2.0 2.0 2.0 2.0 0.0 2.0 2.0
Rest In Walk No No No
Delayed Vehicle Green [s] 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pedestrian Clearance [s] 0.0 10.0 0.0 10.0 0.0 17.0 0.0 Walk [s] 0.0 5.0 0.0 5.0 0.0 5.0 0.0
All red [s] 1.0 1.0 1.0 1.0 0.0 1.0 1.0
Amber [s] 3.0 3.0 3.0 3.0 0.0 3.0 3.0
Maximum Green [s] 30 25 30 25 0 30 30
Auxiliary Signal Groups
Signal Group 1 6 5 2 0 3 1
Flashing Yellow Arrow
Control Type Protected Permissive Protected Permissive Permissive Permissive Permissive Phasing & Timing (Basic)
Pedestrian Recall No No No No No
Maximum Recall No No No No No
Minimum Recall No No No No No
Vehicle Extension [s] 3.0 3.0 3.0 3.0 0.0 3.0 3.0
Minimum Green [s] 5 10 5 10 0 5 5
Lead / Lag Lead - Lead - - Lead -
Split [s] 13.0 29.0 15.0 31.0 0.0 26.0 13.0
Phasing & Timing: Pattern 1
Pedestrian Clearance [s] 0
Pedestrian Walk [s] 0
Pedestrian Signal Group 0
Exclusive Pedestrian Phase
3 8/4/2025
Generated with Cottonwood and Park
Version 2025 (SP 0-5) TJW Engineering, Inc. Scenario 10: 10 Opening + Project AM improvements PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00
d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 d2, Incremental Delay [s] 2.39 0.68 8.61 2.49 2.49 0.06 8.45 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 k, delay calibration 0.11 0.50 0.11 0.50 0.50 0.11 0.15 d1, Uniform Delay [s] 31.54 7.80 34.21 10.92 10.92 21.65 26.35 c, Capacity [veh/h] 252 2157 25 1023 1020 395 353
s, saturation flow rate [veh/h] 3514 3618 1810 1900 1895 1810 1615 (v / s)_i Volume / Saturation Flow Rate 0.04 0.27 0.00 0.32 0.32 0.01 0.19 g / C, Green / Cycle 0.07 0.60 0.01 0.54 0.54 0.22 0.22 g_i, Effective Green Time [s] 5.0 41.8 0.9 37.7 37.7 15.3 15.3 l2, Clearance Lost Time [s] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 l1_p, Permitted Start-Up Lost Time [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 L, Total Lost Time per Cycle [s] 4.00 4.00 4.00 4.00 4.00 4.00 4.00 C, Calculated Cycle Length [s] 70 70 70 70 70 70 70
Lane Group L C L C C L R
Lane Group Calculations
95th-Percentile Queue Length [ft/ln] 56.27 136.71 9.04 232.60 232.22 13.21 232.28 95th-Percentile Queue Length [veh/ln] 2.25 5.47 0.36 9.30 9.29 0.53 9.29 50th-Percentile Queue Length [ft/ln] 31.26 75.95 5.02 136.72 136.44 7.34 136.48 50th-Percentile Queue Length [veh/ln] 1.25 3.04 0.20 5.47 5.46 0.29 5.46 Critical Lane Group Yes No No No Yes No Yes
Lane Group LOS C A D B B C C
d, Delay for Lane Group [s/veh] 33.93 8.48 42.83 13.41 13.42 21.71 34.81 X, volume / capacity 0.61 0.45 0.36 0.59 0.59 0.06 0.86 Lane Group Results
4 8/4/2025
Generated with Cottonwood and Park
Version 2025 (SP 0-5) TJW Engineering, Inc. Scenario 10: 10 Opening + Project AM improvements Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 33.93 8.48 42.83 13.41 13.42 21.71 34.81 Movement LOS C A D B B C C
d_A, Approach Delay [s/veh] 11.96 13.63 33.89
Approach LOS B B C
d_I, Intersection Delay [s/veh] 15.42
Intersection LOS B
Intersection V/C 0.641
Emissions
Vehicle Miles Traveled [mph] 119.23 753.33 3.71 248.56 247.94 2.00 26.54 Stops [stops/h] 128.62 312.49 10.33 281.25 280.68 15.10 280.76 Fuel consumption [US gal/h] 6.75 31.39 0.33 13.66 13.63 0.27 4.80 CO [g/h] 471.78 2194.00 23.36 954.86 952.67 18.69 335.79 NOx [g/h] 91.79 426.87 4.55 185.78 185.35 3.64 65.33
VOC [g/h] 109.34 508.48 5.41 221.30 220.79 4.33 77.82
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 0.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 26.58 0.00 26.58
I_p,int, Pedestrian LOS Score for Intersectio 3.082 0.000 2.240 Crosswalk LOS C F B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 714 771 629 d_b, Bicycle Delay [s] 14.46 13.21 16.46
I_b,int, Bicycle LOS Score for Intersection 2.489 2.560 1.560 Bicycle LOS B B A
Ring 4 - - - - - - - - - - - - - - - -
Ring 3 - - - - - - - - - - - - - - - -
Ring 2 5 6 - - - - - - - - - - - - - -
Ring 1 1 2 3 - - - - - - - - - - - - -
Sequence
5 8/4/2025
Generated with Cottonwood and Park
Version 2025 (SP 0-5) TJW Engineering, Inc. Scenario 11: 11 Opening + Project PM improvements Intersection Level Of Service Report
Intersection 5: Magnolia Ave/Park Center Dr
Control Type: Signalized Delay (sec / veh): 13.1
Analysis Method: HCM 7th Edition Level Of Service: B
Analysis Period: 15 minutes Volume to Capacity (v/c): 0.473 Crosswalk Yes No Yes
Curb Present No No No
Grade [%] 0.00 0.00 0.00
Speed [mph] 45.00 45.00 30.00
Exit Pocket Length [ft] 0.00 0.00 0.00 0.00 0.00 0.00 100.00 No. of Lanes in Exit Pocket 0 0 0 0 0 0 1
Entry Pocket Length [ft] 80.00 100.00 100.00 100.00 100.00 140.00 100.00 No. of Lanes in Entry Pocket 1 0 1 0 1 1 0
Lane Width [ft] 12.00 12.00 12.00 12.00 12.00 12.00 12.00 Turning Movement Left Thru U-turn Thru Right Left Right Lane Configuration
Approach Northbound Southbound Eastbound
Name Magnolia Avenue Magnolia Avenue Park Center Drive
Intersection Setup
1 8/5/2025
Generated with Cottonwood and Park
Version 2025 (SP 0-5) TJW Engineering, Inc. Scenario 11: 11 Opening + Project PM improvements Bicycle Volume [bicycles/h] 0 0 0
v_ab, Corner Pedestrian Volume [ped/h] 0 0 0
v_ci, Inbound Pedestrian Volume crossing mi 0 0 0
v_co, Outbound Pedestrian Volume crossing 0 0 0
v_di, Inbound Pedestrian Volume crossing m 0 0 0
v_do, Outbound Pedestrian Volume crossing 0 0 0
Local Bus Stopping Rate [/h] 0 0 0 0 0 0 0
On-Street Parking Maneuver Rate [/h] 0 0 0 0 0 0 0
Presence of On-Street Parking No No No No No No
Total Analysis Volume [veh/h] 326 1111 1 792 21 10 171
Total 15-Minute Volume [veh/h] 82 278 0 198 5 3 43
Other Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Peak Hour Factor 0.9630 0.9630 0.9630 0.9630 0.9630 0.9630 0.9630 Total Hourly Volume [veh/h] 314 1070 1 763 20 10 165
Right Turn on Red Volume [veh/h] 0 0 0 0 0 0 0
Other Volume [veh/h] 0 0 0 0 0 0 0
Existing Site Adjustment Volume [veh/h] 0 0 0 0 0 0 0
Pass-by Trips [veh/h] 0 0 0 0 0 0 0
Diverted Trips [veh/h] 130 0 0 0 0 0 80
Site-Generated Trips [veh/h] 173 20 0 15 17 7 73
In-Process Volume [veh/h] 0 0 0 0 0 0 0
Growth Factor 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 1.0200 Proportion of CAVs [%] 0.00
Heavy Vehicles Percentage [%] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Base Volume Adjustment Factor 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 Base Volume Input [veh/h] 11 1029 1 733 3 3 12
Name Magnolia Avenue Magnolia Avenue Park Center Drive
Volumes
2 8/5/2025
Generated with Cottonwood and Park
Version 2025 (SP 0-5) TJW Engineering, Inc. Scenario 11: 11 Opening + Project PM improvements Lost time [s] 10.00
Permissive Mode SingleBand
Offset Reference Lead Green - Beginning of First Green
Offset [s] 0.0
Actuation Type Fully actuated
Coordination Type Time of Day Pattern Coordinated
Active Pattern Pattern 1
Cycle Length [s] 80
Signal Coordination Group -
Located in CBD No
Intersection Settings
I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Advanced Detector Length [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Advanced Detector Location [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector Length [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector Location [ft] 0.0 0.0 0.0 0.0 0.0 0.0 0.0
l2, Clearance Lost Time [s] 2.0 2.0 2.0 2.0 0.0 2.0 2.0 l1, Start-Up Lost Time [s] 2.0 2.0 2.0 2.0 0.0 2.0 2.0
Rest In Walk No No No
Delayed Vehicle Green [s] 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Pedestrian Clearance [s] 0.0 10.0 0.0 10.0 0.0 17.0 0.0 Walk [s] 0.0 5.0 0.0 5.0 0.0 5.0 0.0
All red [s] 1.0 1.0 1.0 1.0 0.0 1.0 1.0
Amber [s] 3.0 3.0 3.0 3.0 0.0 3.0 3.0
Maximum Green [s] 30 30 10 30 0 30 30
Auxiliary Signal Groups
Signal Group 1 6 5 2 0 3 1
Flashing Yellow Arrow
Control Type Protected Permissive Protected Permissive Permissive Permissive Permissive Phasing & Timing (Basic)
Pedestrian Recall No No No No No
Maximum Recall No No No No No
Minimum Recall No No No No No
Vehicle Extension [s] 3.0 3.0 3.0 3.0 0.0 3.0 3.0
Minimum Green [s] 5 10 5 10 0 5 5
Lead / Lag Lead - Lead - - Lead -
Split [s] 23.0 35.0 19.0 31.0 0.0 26.0 23.0
Phasing & Timing: Pattern 1
Pedestrian Clearance [s] 0
Pedestrian Walk [s] 0
Pedestrian Signal Group 0
Exclusive Pedestrian Phase
3 8/5/2025
Generated with Cottonwood and Park
Version 2025 (SP 0-5) TJW Engineering, Inc. Scenario 11: 11 Opening + Project PM improvements PF, progression factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Rp, platoon ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00
d3, Initial Queue Delay [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 d2, Incremental Delay [s] 2.46 0.52 33.20 0.19 0.20 0.07 7.45 I, Upstream Filtering Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 k, delay calibration 0.11 0.50 0.11 0.11 0.11 0.11 0.11 d1, Uniform Delay [s] 33.73 4.60 39.85 8.37 8.37 30.44 33.86 c, Capacity [veh/h] 440 2597 4 1130 1120 235 210
s, saturation flow rate [veh/h] 3514 3618 1810 1900 1883 1810 1615 (v / s)_i Volume / Saturation Flow Rate 0.09 0.31 0.00 0.21 0.21 0.01 0.11 g / C, Green / Cycle 0.13 0.72 0.00 0.59 0.59 0.13 0.13 g_i, Effective Green Time [s] 10.0 57.5 0.1 47.6 47.6 10.4 10.4 l2, Clearance Lost Time [s] 2.00 2.00 2.00 2.00 2.00 2.00 2.00 l1_p, Permitted Start-Up Lost Time [s] 0.00 0.00 0.00 0.00 0.00 0.00 0.00 L, Total Lost Time per Cycle [s] 4.00 4.00 4.00 4.00 4.00 4.00 4.00 C, Calculated Cycle Length [s] 80 80 80 80 80 80 80
Lane Group L C L C C L R
Lane Group Calculations
95th-Percentile Queue Length [ft/ln] 135.12 105.60 2.42 130.03 128.92 7.66 161.13 95th-Percentile Queue Length [veh/ln] 5.40 4.22 0.10 5.20 5.16 0.31 6.45 50th-Percentile Queue Length [ft/ln] 75.07 58.66 1.34 72.24 71.62 4.26 89.52 50th-Percentile Queue Length [veh/ln] 3.00 2.35 0.05 2.89 2.86 0.17 3.58 Critical Lane Group Yes No No No Yes No Yes
Lane Group LOS D A E A A C D
d, Delay for Lane Group [s/veh] 36.19 5.11 73.06 8.57 8.57 30.51 41.31 X, volume / capacity 0.74 0.43 0.26 0.36 0.36 0.04 0.81 Lane Group Results
4 8/5/2025
Generated with Cottonwood and Park
Version 2025 (SP 0-5) TJW Engineering, Inc. Scenario 11: 11 Opening + Project PM improvements Movement, Approach, & Intersection Results
d_M, Delay for Movement [s/veh] 36.19 5.11 73.06 8.57 8.57 30.51 41.31 Movement LOS D A E A A C D
d_A, Approach Delay [s/veh] 12.16 8.65 40.71
Approach LOS B A D
d_I, Intersection Delay [s/veh] 13.11
Intersection LOS B
Intersection V/C 0.473
Emissions
Vehicle Miles Traveled [mph] 252.40 860.17 0.41 168.52 167.03 0.87 14.88 Stops [stops/h] 270.25 211.19 2.42 130.03 128.92 7.66 161.13 Fuel consumption [US gal/h] 14.41 33.27 0.06 8.11 8.03 0.14 2.94 CO [g/h] 1007.46 2325.34 4.13 566.54 561.58 9.80 205.51 NOx [g/h] 196.01 452.43 0.80 110.23 109.26 1.91 39.98
VOC [g/h] 233.49 538.92 0.96 131.30 130.15 2.27 47.63
Other Modes
g_Walk,mi, Effective Walk Time [s] 9.0 0.0 9.0
M_corner, Corner Circulation Area [ft²/ped] 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped] 0.00 0.00 0.00 d_p, Pedestrian Delay [s] 31.51 0.00 31.51
I_p,int, Pedestrian LOS Score for Intersectio 3.034 0.000 2.255 Crosswalk LOS C F B
s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h] 775 675 550 d_b, Bicycle Delay [s] 15.01 17.56 21.03
I_b,int, Bicycle LOS Score for Intersection 2.745 2.231 1.560 Bicycle LOS B B A
Ring 4 - - - - - - - - - - - - - - - -
Ring 3 - - - - - - - - - - - - - - - -
Ring 2 5 6 - - - - - - - - - - - - - -
Ring 1 1 2 3 - - - - - - - - - - - - -
Sequence
5 8/5/2025

← All documents from this meeting