Cities Index.
Agenda packet

Seal Beach City Council
July 27, 2026

Document
Agenda packet
Meeting
July 27, 2026
Body
Seal Beach City Council
Pages
265
Original file
67.8 MB
Text extracted from the city's file for reading and search. Open the original on sealbeach.primegov.com. That file is the official record.

Section 9. Section 19. 0 ( Waiver) is hereby replaced in its entirety to read as follows:

19. 0 Waiver
No delay or omission to exercise any right, power or remedy accruing to City under this Agreement shall impair any right, power or remedy of City, nor shall it be construed as a waiver of, or consent to, any breach or default.

No waiver of any breach, any failure of a condition, or any right or remedy under this Agreement shall be ( i) effective unless it is in writing and signed by the Party making the waiver, ( ii) deemed to be a waiver of, or consent to, any other breach, failure of a condition, or right or remedy, or (iii) deemed to constitute a continuing waiver unless the writing expressly so states." Section 10. Section 24. 0( Ownership of Work Product is hereby added to the A r
eement to read as follows:

24. 0 Ownership of Work Product

24. 1. Unless otherwise agreed upon in writing, all field notes and other notes, draft and final reports, drawings, specifications, data, surveys, studies, plans, maps, models, photographs, images, ideas, concepts, designs including but not limited to website designs, source code, object code, computer files, electronic data and/ or electronic files, other media of any kind whatsoever, and any other documents and written material of any kind, created, developed, prepared or used by Consultant in the performance of this Agreement ( collectively " Work Product") shall be considered " works made for hire," for the benefit of City. Upon completion of, or in the event of termination or expiration of this Agreement, all Work Product and any and all intellectual property rights arising from their creation, including, but not limited to, all copyrights and other proprietary rights, shall be and remain the property of City without restriction or limitation upon their use, duplication or dissemination by City upon final payment being made in accordance with Subsection 5. 3, and may be used, reused or otherwise disposed of by City for any purpose without Consultant' s consent; provided that any use, reuse or modification of the Work Product by City for any purpose other than the purpose for which the Work Product was prepared or provided under this Agreement shall be at City' s own risk. Consultant shall not obtain or attempt to obtain copyright protection as to any of the Work Product.

24. 2. Consultant hereby assigns to City all ownership and any and all intellectual property rights to the Work Product that are not otherwise vested in City pursuant to Subsection 24. 1.

Page 5 ends

24. 3. Consultant warrants and represents that it has secured all necessary licenses, consents or approvals to use any instrumentality, thing or component as to which any intellectual property right exists, including computer software, used in the rendering of the Services and the production of all Work Product produced under this Agreement, and that City has full legal title to and the right to reproduce the Work Product for any purpose.

Consultant shall defend, indemnify and hold City, its elected and appointed officials, officers, employees, agents, servants, attorneys, volunteers, and those City agents serving as independent contractors in the role of City officials, harmless from any loss, claim or liability in any way related to a claim that City' s use of any of the Work Product violates federal, state or local laws, or any contractual provisions, or any laws relating to trade names, licenses, franchises, copyrights, patents or other means of protecting intellectual property rights and/or interests in products or inventions. Consultant shall bear all costs arising from the use of patented, copyrighted, trade secret or trademarked documents, materials, equipment, devices or processes in connection with its provision of the Services and Work Product produced under this Agreement. In the event the use of any of the Work Product or other deliverables hereunder by City is held to constitute an infringement and the use of any of the same is enjoined, Consultant, at its expense, shall: ( i) secure for City the right to continue using the Work Product and other deliverables by suspension of any injunction, or by procuring a license or licenses for City; or ( ii) modify the Work Product and other deliverables so that they become non -infringing while remaining in compliance with the requirements of this Agreement.

Consultant' s covenants and obligations under this Section shall survive the expiration or termination of this Agreement.

24. 4. Upon expiration or termination of the Agreement, Consultant shall deliver to City all Work Product and other deliverables related to any Services performed pursuant to this Agreement without additional cost or expense to City. If Consultant prepares a document on a computer, Consultant shall provide City with said document both in a printed format and in an electronic format that is acceptable to City.

Section 11. Section 25. 5( Confidentiality) is hereby added to the Agreement to read as follows.,

25.0 Confidentiality

25. 1. Consultant may have access to financial, accounting, statistical, and personnel data of individuals and City employees, trade secrets, and/ or other information that may be protected under other

Page 6 of 18 ends

applicable laws relating to privacy, confidentiality and/ or privilege.

Consultant covenants that all Work Product (as defined in Subsection 24. 1) and/ or any other data, documents, writings, discussion or other information created, developed, received or provided by Consultant in the performance of this Agreement are confidential unless such information is in the public domain or already known to Consultant. Consultant shall not release or disclose any such Work Product, data, documents, writings, discussion or other information to persons or entities other than City without prior written authorization by City. City shall grant such authorization if applicable law requires disclosure. Consultant, its officers, employees, agents, servants, and/ or subcontractors shall not without written authorization from the City Manager or unless requested in writing by the City Attorney, voluntarily provide declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the Services performed under this Agreement or relating to any project or property located within City. Response to a subpoena or court order shall not be considered voluntary," provided Consultant gives City timely notice of such court order or subpoena.

25. 2. Consultant shall promptly notify City should Consultant, its officers, employees, agents, servants, and/ or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed thereunder or with respect to any project or property located within City. City may, but has no obligation to, represent Consultant or be present at any deposition, hearing or similar proceeding.

Consultant agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Consultant. However, City' s right to review any such response does not imply or mean the right by City to control, direct or rewrite the response.

25. 3. Consultant' s covenants and obligations under this Section shall survive the termination or expiration of this Agreement." Section 12. Section 26. 0 ( Inspection and Audit of Records) is hereby added to the Agreement to read as follows:

26. 0 Inspection and Audit of Records
Consultant shall maintain complete and accurate records with respect to all Services and other matters covered under this Agreement, including but expressly not limited to, all Services performed, salaries, wages, payroll, invoices, time cards, cost control sheets, costs, expenses, receipts and

Page 7 of 18 ends

other records and Work Product with respect to this Agreement. Consultant shall maintain adequate records on the Services provided in sufficient detail to permit an evaluation of all Services in connection therewith. All such records shall be clearly identified and readily accessible. Upon 24 hours' notice by City, during regular business hours Consultant shall provide City with free access to such records, and the right to examine and audit the same and to make copies and transcripts as City deems necessary, and shall allow inspection of all program data, information, documents, proceedings and activities and all other matters related to the performance of the Services under this Agreement. Consultant shall retain all financial and program service records and all other records related to the Services and performance of this Agreement for at least three ( 3) years after expiration, termination or final payment under this Agreement, whichever occurs later. City' s rights under this Section shall survive for three ( 3) years after expiration, termination or final payment under this Agreement, whichever occurs later."
Section 13. Section 27. 0 ( Permits and Licenses) is hereby added to the Agreement to read as follows:

27. 0 Permits and Licenses
Consultant and all of Consultant' s employees and other personnel shall obtain and maintain during the Agreement term all necessary licenses, registrations, permits and certificates required by law for the provision of the Services under this Agreement, including a business license as required by the Seal Beach Municipal Code."
Section 14. Section 28. 0( Safety Requirements) is hereby added to the AcIreement to read as follows:

28. 0 Safety Requirements
All work performed under this Agreement shall be performed in such a manner as to provide safety to the public and to meet or exceed the safety standards outlined by CAL OSHA and other applicable state and federal laws. City may issue restraint or cease and desist orders to Consultant when unsafe or harmful acts are observed or reported relative to the performance of the Services. Consultant shall maintain the work sites free of hazards to persons and property resulting from its operations. Consultant shall immediately report to City any hazardous condition noted by Consultant."
Section 15. Section 29. 0 Labor Certification) is hereby added to the Agreement to read as follows:

Page 8 of 18 ends

29. 0 Labor Certification
By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code that require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services."
Section 16. Section 30. 0( Prevailing Wage and -Payroll Records is hereby added to the Agreement to read as follows:

30. 0 Prevailing Wage and Payroll Records
To the extent that this Agreement calls for services that, in whole or in part, constitute "public works" as defined in the California Labor Code, Consultant shall comply in all respects with all applicable provisions of the California Labor Code, including those set forth in Exhibit B, attached hereto and incorporated by reference herein. "
Section 17. Section 31. 0 ( Government Code Claim Compliance) is hereby added to the Agreement to read as follows:

31. 0 Government Code Claim Compliance
In addition to any and all requirements of this Agreement pertaining to notices of and requests for compensation or payment for additional services, disputed work, claims and/ or changed conditions, Consultant must comply with the claim procedures set forth in Government Code Section 900 et seq. prior to filing any lawsuit against City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to additional services, disputed work, claims, and/ or changed conditions have been followed by Consultant. If no such Government Code claim is submitted, or if any prerequisite contractual requirements are not otherwise satisfied as specified herein, Consultant shall be barred from bringing and maintaining a lawsuit against City."
Section 18. Section 32. 0 ( Non -Exclusive Agreement) is hereby added to the Agreement to read as follows:

32. 0 Non -Exclusive Agreement
Consultant acknowledges that City may enter into agreements with other consultants for services encompassed by or similar to the services that are subject to this Agreement or may have its own employees perform services

Page 9 of 18 ends

encompassed by or similar to those services contemplated by this Agreement."
Section 19. Section 33. 0 ( Final Payment Acceptance Constitutes Release) is hereby added to the Agreement to read as follows:

33. 0 Final Payment Acceptance Constitutes Release
The acceptance by Consultant of the final payment made under this Agreement shall operate as and be a release of City from all claims and liabilities for compensation to Consultant for anything done, furnished or relating to Consultant' s work or services. Acceptance of payment shall be any negotiation of City's check or the failure to make a written extra compensation claim within ten calendar days of the receipt of that check.

However, approval or payment by City shall not constitute, nor be deemed, a release of the responsibility and liability of Consultant, Its employees, subcontractors, agents, and servants for the accuracy and competency of the information provided and/ or work performed; nor shall such approval or payment be deemed to be an assumption of such responsibility or liability by City for any defect or error in the work prepared by Consultant, its employees, subcontractors, agents and servants."
Section 20. Section 34. 0 ( Corrections) is hereby added to the Agreement to read as follows:

34. 0 Corrections
In addition to the indemnification obligations set forth above, Consultant shall correct, at its expense, all errors in the work which may be disclosed during City' s review of Consultant's report or plans. Should Consultant fail to make such correction in a reasonably timely manner, such correction may be made by City, and the cost thereof shall be charged to Consultant. In addition to all other available remedies, City may deduct the cost of such correction from any retention amount held by City or may withhold payment otherwise owed Consultant under this Agreement up to the amount of the cost of correction."
Section 21. Section 35. 0 ( Non -Appropriations of Funds) is hereby added to the Agreement to read as follows:

35. 0 Non -Appropriation of Funds
Payments to be made to Consultant by City for any Services performed within the current fiscal year are within the current fiscal budget and within an available, unexhausted fund. In the event that City does not appropriate sufficient funds for payment of Consultant' s Services beyond the current

Page 10 of 18 ends

fiscal year, this Agreement shall cover payment for Consultant' s Services only to the conclusion of the last fiscal year in which City appropriates sufficient funds and shall automatically terminate at the conclusion of such fiscal year."
Section 22. Section 36. 0 ( Mutual Cooperation) is hereby added to the Agreement to read as follows:

36. 0 Mutual Cooperation

36. 1 City' s Cooperation. City shall provide Consultant with all pertinent data, documents and other requested information as is reasonably available for Consultant' s proper performance of the Services required under this Agreement.

36. 2 Consultant' s Cooperation. Consultant agrees to work closely and cooperate fully with City' s representative and any other agencies that may have jurisdiction or interest in the work to be performed. In the event any claim or action is brought against City relating to Consultant' s performance of Services rendered under this Agreement, Consultant shall render any reasonable assistance that City requires."
Section 23. Section 37. 0 ( Time is of the Essence) is hereby added to the Agreement to read as follows:

37. 0 Time of the Essence
Time is of the essence in respect to all provisions of this Agreement that specify a time for performance; provided, however, that the foregoing shall not be construed to limit or deprive a Party of the benefits of any grace or use period allowed in this Agreement."
Section 24. Section 38. 0 ( Titles and Headings) is hereby added to the Agreement to read as follows:

38. 0 Titles and Headings
The titles and headings used in this Agreement are for convenience only and shall in no way define, limit or describe the scope or intent of this Agreement or any part of it."
Section 25. All references to the term " Agreement" throughout Sections

1. 0 through 38. 0 inclusive, of the Agreement are hereby modified to include the

Page 11 of 18 ends

this Amendment 1, dated October 27, 2025, and all provisions hereof, as if all of those terms are fully set forth therein.

Section 426. Except as expressly modified or supplemented by this Amendment 1, all other provisions of the Agreement shall remain unaltered and in full force and effect.

Section 427. The persons executing this Amendment 1 on behalf of Consultant warrants that he or she is fully authorized to execute this Amendment 1 on behalf of said Party, and that by his or her execution, Consultant is formally bound to the provisions of this Amendment 1.

Signatures on the following pages]

Page 12 of 18 ends

IN WITNESS WHEREOF, the Parties hereto, through their respective authorized representatives have executed this Agreement as of the date and year first above written.

CITY OF SEAL BEACH
0 Atti
0 r ' ' F
Patrick Gallegos, City Manager
CONSULTANT: HF& H Consultants,
LLC ,
BY
Laith B. Ezzet
Senior Vice President
Approved as to Form.

By i&- A
Nicholas Ghirelli, City Attorney

Page 13 of 18 ends

EXHIBIT A- 1
11 A6W%x 28, 2025
Iris Lre
C?:reapr or PLUIC Worl, S
CItY of Seal baactt
2 11 E; hth Street
Stal beach. CA L 0740
SCR[ via erww. dr g sra'barG rs: a. pd/
HF& M Consultants
590 Ygnaoo va' 4y Rd. Sutte t05
Walnut Crack, G 44596
Phone: ( 925) 977- 6950
Web: hfh- wnsu=tents to' n
Suejedl UpdaW Proposal to Piovide on -Call Negotiotlon Consultant Services Dear Iris
mFeiH Consultarxs ( NMM) is chased to su! rnit this ipdared propm ' to that City of Seal Beach City) to prov de an -Call negczatcn censulte" sarvices
Thank you for tha oppartune: y m provide ycu with the updated : cape. We Pack ( omard to an opprorturlty to comnue oLx partnership rrith Via City V ) ecu hdwe a -`r p,.estlor ' ; lease oontha Ha4y Kuriert at ( 949) 251- 0930 or LEM
Very truly yours,
Hrarr 1C6hSULYANTSr LLC
f
r
Lath L= et, icq<
Senior vice Drat dere:
14 of 18
23050800
Natty VAInert
sencr Proxd Hamper
11/ 2019 rev.]
1 BACKGROUND
This proposal mods updated to adjust the ft* WWOS31,
Public Worts DinKw] on W dnesday. August; 27, 2425
2025, was devesoped after a raft wth CIN staff ( Laurin and a fo„ ow• up discussion with City staff ( fns Ler* and 2025. The Inienton cf Ws proposed is to amend
Iris Lee
August 28, 2025
2of2
after a call with City staff ( Iris bee,
Time initial propowl, dated August S,
barich) on Wedirmmuilay, July 23. 2425,
Lauren Sar -ch) on Thursday, July 31,
the budget to continue supporting
negotiatipr: w, h the Gay' s so'•d waste hauler, Repub] llc 5erv4trs ( Republic), for a Senate bill 1383 oorrNrama agreement and to proylde or: -ca Implerr-enta; en support services.

Section 1: Scope of Work
TASK 1: S8 1383 CONTRACTING ASSISTANCE TO FINALIZE

NEGOTIATIONS
The updated budget Is to support tie extended timefrarne of the nepdiatlons and agreement development, as well as adddlormaf time to ana-lyze, fadlteta, and negotLVA the Contract Vat was over and above the original tent pro; *%W. The funds will rover addkk" l tome due to m r+plexZes of m9otlations based or programmatlr assumptions for SB 1383 and recydlrq matters, adCltCnal cn " xl language discussions with the City Attorney' s ofrice, analysis required to avalua. e Costs and assurnptlors used by O. epubec, internal bnedings with City stall, drafting addltiorat contract er<hibds, drafting the Aral negotiated agreen ent, support for drafting the Counpl staff report, and preparation for and partcrpatlon In a City Council meeting to ptesiefk the drafted agreement -
TASK 2: ONGOING S8 1383 IMPLEMENTATION SUPPORT
Upon request frot” CAy staff, HF& H many = 6t with vaemis cn- nail SS 1383 - related rrculres and tasks thst arts* from time to time, to the ex rd the pr ojita budget su piports a request These tasks will rn6u4e legeslatrve research. mmptance tracking and repomi- ig, orad providing pen i" I recyding, ovganes, and sdkl waste liaison assistance as dc&Cr-, W in tie ce g tel proposal.

Section 2: Fee Proposal
We v" 11 pw* rm the scope of work based on time and matwxlals, up bo the am It of tine available budget We understand, based on time can on Atrgccxt . 7, 2025, the additional b udgd for there servicm is f25, 000. Based on per dlscus% on with Gty staff on August 27, time additional budget may fxX ttie u-Mclent to Ctxnp:eae the ne¢etlatlant. In time event that the alsoi— «w budget Is exhdu% ted prior to the Mrnpleucin cf we wrTI work cottabaratrvely with City staff to evaluate the remaining scope aro dete+*m ine If a further budget aClustment r:
needed. The tnitiai budget was ; 115, 0.'14, and the Lptiated total budge. LrduJing time additsonal f25, ODO, rvcn.bd tx S140, 000. Hourly rates for profe-d.r•+ ml and admlnistrathiv cersannal are bukd as provkkd under our cufea t profess. onal services agreernent. 15 of 18
23050800 [ 11/ 2019 rev.]

EXHIBIT B

TERMS FOR COMPLIANCE WITH CALIFORNIA LABOR LAW REQUIREMENTS

1. This Agreement calls for services that, in whole or in part, constitute " public works" as defined in Division 2, Part 7, Chapter 1 ( commencing with Section 1720) of the California Labor Code (" Chapter 1"). Further, Consultant acknowledges that this Agreement is subject to ( a) Chapter 1 and ( b) the rules and regulations established by the Department of Industrial Relations (" DIR") implementing such statutes. Therefore, as to those Services that are " public works", Consultant shall comply with and be bound by all the terms, rules and regulations described in 1( a) and 1( b) as though set forth in full herein.

2. California law requires the inclusion of specific Labor Code provisions in certain contracts. The inclusion of such specific provisions below, whether or not required by California law, does not alter the meaning or scope of Section 1 above.

3. Consultant shall be registered with the Department of Industrial Relations in accordance with California Labor Code Section 1725. 5, and has provided proof of registration to City prior to the Effective Date of this Agreement. Consultant shall not perform work with any subcontractor that is not registered with DIR pursuant to Section 1725. 5. Consultant and subcontractors shall maintain their registration with the DIR in effect throughout the duration of this Agreement. If Consultant or any subcontractor ceases to be registered with DIR at any time during the duration of the project, Consultant shall immediately notify City.

4. Pursuant to Labor Code Section 1771. 4, Consultant' s Services are subject to compliance monitoring and enforcement by DIR. Consultant shall post job site notices, as prescribed by DIR regulations.

5. Pursuant to Labor Code Section 1773. 2, copies of the prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Agreement are on file at City Hall and will be made available to any interested party on request.

Consultant acknowledges receipt of a copy of the DIR determination of such prevailing rate of per diem wages, and Consultant shall post such rates at each job site covered by this Agreement.

6. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. Consultant shall, as a penalty to City, forfeit 200.00 for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Consultant or by any subcontractor.

7. Consultant shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Consultant and each subcontractor to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified in Section 1776; 16 of 18
23050800 [ 11/ 2019 rev.]
certify and make such payroll records available for inspection as provided by Section 1776; and inform City of the location of the records.

8. Consultant shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777. 6 and 1777.7 and California Code of Regulations, Title 8, Section 200 et seq. concerning the employment of apprentices on public works projects. Consultant shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Consultant shall provide City with a copy of the information submitted to any applicable apprenticeship program.

Within 60 days after concluding work pursuant to this Agreement, Consultant and each of its subcontractors shall submit to City a verified statement of the journeyman and apprentice hours performed under this Agreement.

9. Consultant shall not perform work with any Subcontractor that has been debarred or suspended pursuant to California Labor Code Section 1777. 1 or any other federal or state law providing for the debarment of contractors from public works. Consultant and subcontractors shall not be debarred or suspended throughout the duration of this Contract pursuant to Labor Code Section 1777. 1 or any other federal or state law providing for the debarment of contractors from public works. If Consultant or any subcontractor becomes debarred or suspended during the duration of the project, Consultant shall immediately notify City.

10. Consultant acknowledges that eight hours labor constitutes a legal day's work.

Consultant shall comply with and be bound by Labor Code Section 1810. Consultant shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. Consultant shall, as a penalty to City, forfeit

25. 00 for each worker employed in the performance of this Agreement by Consultant or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code Section 1815, work performed by employees of Consultant in excess of eight hours per day, and 40 hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of eight hours per day at not less than one and one- half times the basic rate of pay.

11. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Consultant hereby certifies as follows:

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract."

12. For every subcontractor who will perform work on the project, Consultant shall be responsible for such subcontractor' s compliance with Chapter 1 and Labor Code Sections 1860 and 3700, and Consultant shall include in the written contract between it and each 17 of 18
23050800 [ 11/ 2019 rev.]
subcontractor a copy of those statutory provisions and a requirement that each subcontractor shall comply with those statutory provisions. Consultant shall be required to take all actions necessary to enforce such contractual provisions and ensure subcontractor' s compliance, including without limitation, conducting a periodic review of the certified payroll records of the subcontractor and upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages.

Consultant shall diligently take corrective action to halt or rectify any failure.

13. To the maximum extent permitted by law, Consultant shall indemnify, hold harmless and defend ( at Consultant' s expense with counsel reasonably acceptable to City) City, its officials, officers, employees, agents and independent contractors serving in the role of City officials, and volunteers from and against any demand or claim for damages, compensation, fines, penalties or other amounts arising out of or incidental to any acts or omissions listed above by any person or entity ( including Consultant, its subcontractors, and each of their officials, officers, employees and agents) in connection with any work undertaken or in connection with the Agreement, including without limitation the payment of all consequential damages, attorneys' fees, and other related costs and expenses. All duties of Consultant under this Section shall survive the termination of the Agreement. 18 of 18
23050800 [ 11/ 2019 rev.]

AGENDA STAFF REPORT
DATE: July 27, 2026
TO: Honorable Mayor and City Council
THRU: Patrick Gallegos, City Manager
FROM: Nicholas R. Ghirelli, City Attorney
Iris Lee, Public Works Director
SUBJECT: Council Direction on Terms of Potential Franchise Agreement with the Los Angeles Department of Water and
Power and City of Long Beach for the Haynes Generating
Station Recycled Water Pipeline Project (Discussion Only; No Action Will Be Taken on Any Franchise or Permit for
the Project)
________________________________________________________________ SUMMARY OF REQUEST:

That the City Council provide direction to staff on the terms of a potential franchise agreement with the Los Angeles Department of Water and Power (“LADWP”) for the placement of a recycled water pipeline and sewer force main within the City of Seal Beach’s right-of-way (ROW) along College Park Drive.

BACKGROUND:

The Long Beach Utilities Department (“LBUD”), on behalf of LADWP, is constructing a recycled water pipeline and sewer force main along Studebaker Road. The pipeline project is currently proposed to cross the San Gabriel River along College Park Drive, then under State Route 22 to the LADWP Haynes Generating Station (“Project”). A portion of the Project, known as Segment RW 1- 14, is within Seal Beach’s jurisdictional boundaries. It includes College Park Drive. This portion does not include the College Park Drive Bridge, which is located within the City of Long Beach and is maintained by Long Beach.

The Project includes two components: (1) construct a continuous recycled water pipeline intended to supply recycled water to the LADWP facility located in Long Beach; and (2) install a 12-inch diameter sewer force main that will run from the LADWP Haynes Generating Station to an existing 42-inch sewer main at the Los Angeles County Services District Long Beach Water Reclamation Facility. These pipelines are designed to supply and remove recycled water to and from the wet cooling system at the Haynes Generating Station, located in Long Beach.

Page 2 ends

The project proposes to add the recycled water pipeline and the sewer force main, respectively, to each side of the College Park Drive Bridge.

LBUD prepared an Initial Study/Mitigated Negative Declaration (IS/MND) for the Project dated July 18, 2024 (SCH #: 2024010488). Seal Beach is a responsible agency under CEQA in connection with the Project and submitted two (2) letters to LBUD (dated January 24, 2024 and July 9, 2024) on the proposed IS/MND and Project, including that a franchise agreement or easement would be required in order to construct any portion of the Project through Seal Beach’s public right of way. LBUD acknowledged Seal Beach’s comments and responded that LBUD will obtain a franchise agreement and/or easement for the project activities occurring within Seal Beach prior to construction. Copies of the City’s letters and LBUD’s responses are attached to this report (Attachments A and B).

On April 18, 2024, the Long Beach Public Utilities Commission authorized the General Manager to adopt and approve the final IS/MND, adopt the Mitigation Monitoring and Reporting Program including the filing of a Notice of Determination with the Los Angeles County Clerk, and execute the appropriate environmental documents related to the LADWP Haynes Generating Station Sewer Pipeline Project (SC 0442). A Notice of Determination for the recycled water (RW) pipeline was posted by the State Clearinghouse on April 22, 2024.

The portion of the Recycled Water Project along Studebaker Road is currently underway and is expected to be completed soon. LBUD has communicated that this portion of the project is expected to be completed in August 2027. The Sewer Pipeline Project is in the permitting process. In addition, a new potable water system upgrade is proposed by LBUD with design procurement to begin in August 2026.

Relevant here, staff is also informed that LADWP plans to apply for a franchise from Seal Beach for the water pipeline and sewer pipeline, and that LBUD, which is constructing the Project, will not commence construction on the pipeline segments within Seal Beach until LADWP has obtained the franchise. Such a franchise is consistent with the Project’s own IS/MND and state law, as discussed below.

In addition, LBUD has recently announced plans for a potable water line that is scheduled for design procurement in August 2026.

ANALYSIS:

1. Legal Framework
As noted above, the Project’s IS/MND states that LBUD and LADWP must obtain a franchise (or an easement) from Seal Beach in order to place its utility pipelines within Seal Beach’s ROW. This is an independent requirement under CEQA.

LBUD would have to revise its environmental determination for the Project in order to avoid its own franchise requirement.

Page 3 ends

More importantly, state law sets forth a process by which one municipality may construct utility infrastructure within the streets of another municipality. For example, Public Utilities Code sections 10101 through 10104 establish a process for LBUD and/or LADWP to request and negotiate a franchise with Seal Beach (or an equivalent use agreement, like an easement).

Section 10101 states: “There is granted to every municipal corporation of the State the right to construct, operate, and maintain water and gas pipes, mains and conduits . . . sewers and sewer mains, all with the necessary appurtenances, across, along, in, under, over, or upon any road, street, alley, avenue, or highway, and across, under, or over any railway, canal, ditch, or flume which the route of such works intersects, crosses, or runs along, in such manner as to afford security for life and property.

Section 10102 states: “A municipal corporation exercising its rights under this article shall restore the road, street, alley, avenue, highway, canal, ditch, or flume so used to its former state of usefulness as nearly as may be, and shall locate its use so as to interfere as little as possible with other existing uses of a road, street, alley, avenue, highway, canal, ditch, or flume.” Section 10103 states: “Before any municipal corporation uses any street, alley, avenue, or highway within any other municipal corporation or county, it shall request of the municipal corporation or county that has control over the street, alley, avenue, or highway to agree with it upon the location of the use and the terms and conditions to which the use shall be subject.” Section 10104 states: “If the two municipal corporations . . . are unable to agree on the terms and conditions and location of a use within three months after a proposal to do so, the municipal corporation proposing to use a street, alley, avenue, or highway may bring an action in the superior court of the county in which the street, alley, avenue, or highway is situated against the other municipal corporation or the county to have the terms and conditions and location determined. The superior court may determine and adjudicate the terms and conditions to which the use of the street, avenue, alley, or highway shall be subject, and the location thereof, and upon the making of the final judgment the municipal corporation desiring to do so may enter and use the street, alley, avenue, or highway upon the terms and conditions and at the location specified in the judgment.”
In this case, LBUD and LADWP, which are both departments of municipal corporations, seek to construct water and sewer pipelines within the public streets of another municipality. Such infrastructure may be installed by a municipal corporation under the authority provided by Public Utilities Code Sections 10101 and 10102.

However, in order for LBUD and LADWP to construct their facilities under a street within the City of Seal Beach, one or both agencies must first negotiate a

Page 4 ends

franchise agreement with Seal Beach in order to establish the location of the facilities and the terms and conditions under which they may use Seal Beach’s streets. Such an agreement is often referred to as a “franchise.” Thus, Seal Beach must grant a franchise to LBUD and/or LADWP in order for the Project’s recycled water and sewer main to be placed within College Park Drive.

Only if the agencies cannot reach an agreement within a three-month period may LBUD and/or LADWP seek a court order to have a judge establish the location and terms and conditions of use of College Park Drive for the Project’s two pipelines. This three-month period is not a hard deadline, and the parties may continue to negotiate beyond this period in an effort to reach an agreement without the need for litigation. At this time, neither LBUD nor LADWP has formally applied for a franchise, and the agencies have not begun any formal negotiation that would start the clock on this three-month period.

In the event that LBUD and/or LADWP request that a court establish the location and terms of use of Seal Beach’s ROW, Seal Beach would have an opportunity to participate in those proceedings.

2. Council Direction on Franchise Terms
The purpose of this agenda item is to seek direction from the City Council on its desired terms for a potential franchise. Staff has been informed that LADWP will formally request a franchise from Seal Beach at a later date. Based on the Council’s direction, staff will attempt to negotiate the inclusion of the Council’s requested terms in a proposed franchise for consideration by the City Council at a later date. Under the City Charter, a franchise is adopted by ordinance of the City Council.

Staff is aware that residents of College Park West are concerned about the Project’s impacts on the College Park Drive Bridge, which is the only vehicular access point to and from College Park West. The franchise is an appropriate forum to address these concerns given the Bridge’s impact on Seal Beach’s ROW and the College Park West community.

Potential terms for a franchise include:
1) Require LBUD and LADWP to repair and make retrofit improvements to the College Park Drive Bridge before Project-related construction begins on the Bridge. An underwater inspection of the Bridge should be conducted to determine the scope of these repairs. Staff is informed that the last Caltrans underwater inspection of the Bridge occurred in March 2021, which identified a “poor” Bridge substructure. Similar inspections are expected to occur every five years. Staff is informed that the City of Long Beach is already scheduled to perform Bridge repairs in 2029.

Page 5 ends

2) Require LBUD and/or LADWP to pay a franchise fee to the City as consideration for its right to use the City’s ROW. Such a fee could be based on an appraisal obtained by the City and paid for by LBUD and/or LADWP. 3) Require LBUD and its contractors to obtain applicable encroachment permits from Seal Beach so that Seal Beach can ensure safe traffic flow over the Bridge during construction. Seal Beach would review and approve the traffic control and emergency safety plans for work occurring on the Bridge. 4) Require LBUD to construct a reclaimed water pipeline connection to Seal Beach for the potential future purchase of recycled water by Seal Beach. 5) Provide funding to the College Park West Preserve in order to mitigate impacts on the College Park West community.
6) Require that LBUD trench and install the recycled water pipeline and the sewer force main at the same time (one-time single phase) to avoid duplicative trenching and construction within the City’s right-of-way. 7) Require LBUD to update the “Structural Analysis of College Park Drive Bridge for Pipeline Addition,” prepared by Kleinfelder and dated May 6, 2025 (“Kleinfelder Report”), in order to address comments contained in the Peer Review Memo prepared by BKF Engineers and dated April 30, 2026 (the “Peer Review Report”). BKF was retained by the City to review the findings and conclusions of the Kleinfelder Report. Although the Peer Review Report concludes that the Kleinfelder Report is “technically acceptable,” it recommended certain verifications, clarifications, and updates that should be completed before any construction on the Bridge. An update to the Kleinfelder Report has been provided to Seal Beach, and staff and BKF will review and comment on the final report.
8) Require LBUD and/or LADWP to post performance and payment bonds and provide proof of insurance to protect the City and its residents both during construction and during the term of the franchise.

ENVIRONMENTAL IMPACT:

Because Seal Beach is a responsible agency under CEQA in connection with the Project, prior to the City Council making a decision on a proposed franchise, the City Council would have to make environmental findings under CEQA prior to the City Council making a decision on the proposed franchise. Staff would evaluate the required level of environmental review based upon the final terms of any franchise.

LEGAL ANALYSIS:

The City Attorney has reviewed this staff report as to content and form.

Page 6 ends

FINANCIAL IMPACT:

There is no financial impact at this time.

RECOMMENDATION:

That the City Council provide direction to staff on the terms of a potential franchise agreement with the Los Angeles Department of Water and Power (“LADWP”) for the placement of a recycled water pipeline and sewer force main within the City of Seal Beach’s right-of-way (ROW) along College Park Drive.

SUBMITTED BY: NOTED AND APPROVED:

Nicholas R. Ghirelli Patrick Gallegos
Nicholas R. Ghirelli, City Attorney Patrick Gallegos, City Manager Iris Lee
Iris Lee, Public Works Director
ATTACHMENTS:

A. January 24, 2024 Seal Beach Comment Letter and April 10, 2024 LBUD Response
B. July 9, 2024 Seal Beach Comment Letter and October 2, 2024 LBUD Response
C. Kleinfelder Report
D. Peer Review Report
CITY HALL 211 EIGHTH STREET
SEAL BEACH, CALIFORNIA 90740
(562) 431-2527 • www.sealbeachca.gov

ƒ—ƒ”›ʹͶǡʹͲʹͶ
‡‹•ƒ–‘•
‘‰‡ƒ
Š–‹Ž‹–‹‡•‡’ƒ”–‡–
ͳͺͲͲƒ•–ƒ”†Ž‘™‘ƒ†
‘‰‡ƒ
ŠǡͻͲͺͲ͹
SUBJECT: Haynes Generating Station Recycled Water Pipeline Project – IS/MND
City of Seal Beach Comments
‡ƒ””Ǥƒ–‘•ǣ
Šƒ›‘—ˆ‘”–Ї‘’’‘”–—‹–›–‘
‘‡–‘–Ї
‹–‹ƒŽ–—†›Ȁ‹–‹‰ƒ–‡†‡‰ƒ–‹˜‡
‡
Žƒ”ƒ–‹‘ ˆ‘” –Ї
ƒ›‡•
‡‡”ƒ–‹‰ –ƒ–‹‘ ‡
›
އ† ƒ–‡” ‹’‡Ž‹‡ ”‘Œ‡
–
ȋDz”‘Œ‡
–dzȌȂ†ƒ–‡†
—Ž›ͳͺǡʹͲʹͶǤЇ’”‘Œ‡
–’”‘’‘•‡• –‘‹•–ƒŽŽƒ”‡
›
އ†™ƒ–‡”
’‹’‡Ž‹‡ƒŽ‘‰–—†‡„ƒ‡”‘ƒ†ǡ
”‘••‹‰ –Їƒ
ƒ„”‹‡Ž‹˜‡”ƒŽ‘‰‘ŽŽ‡‰‡ƒ”
”‹˜‡ǡ–Ї—†‡”–ƒ–‡‘—–‡ʹʹ–‘–Ї
ƒ›‡•
‡‡”ƒ–‹‰–ƒ–‹‘Ǥ‡‰‡–
 ͳǦͳͶ ‘ˆ –Ї ”‘Œ‡
– ‹• ™‹–Š‹ –Ї ‹–› ‘ˆ ‡ƒŽ ‡ƒ
Šǯ• ȋDz‹–›dzȌ Œ—”‹•†‹
–‹‘ƒŽ
„‘—†ƒ”‹‡•Ǥ
Ї‹–›‹•‹‰‡‡”ƒŽ•—’’‘”–‘ˆ—•‹‰”‡
›
އ†™ƒ–‡”ƒ•ƒ•—•–ƒ‹ƒ„އ™ƒ–‡””‡•‹Ž‹‡
›
‡ˆˆ‘”–ǢŠ‘™‡˜‡”ǡ™‡™‘—ކŽ‹‡–‘‘ˆˆ‡”–Їˆ‘ŽŽ‘™‹‰
‘‡–•ǣ
ͳǤ GENERAL Ǧ Ї ‘’‡”ƒ–‹‘• ‘ˆ ‘‰ ‡ƒ
Šǯ• —–‹Ž‹–› ™‹–Š‹ –Ї ‹–›ǯ• Œ—”‹•†‹
–‹‘ƒŽ
„‘—†ƒ”‹‡•™‹ŽŽ”‡“—‹”‡ƒˆ”ƒ
Š‹•‡ƒ‰”‡‡‡–ƒ†Ȁ‘”‡ƒ•‡‡–Ǥ
ʹǤ ENVIRONMENTAL CHECKLIST FORMǦЇ‹–›‘ˆ‡ƒŽ‡ƒ
Š•ŠƒŽŽ„‡‘–‡†ƒ•ƒ
Dz—„Ž‹
‰‡
›™Š‘•‡’’”‘˜ƒŽ‹•‡“—‹”‡†dz—†‡”‡
–‹‘ͳͲǤ••—
Šǡ†‡•‹‰ƒ†

‘•–”—
–‹‘Ǧ”‡Žƒ–‡†‹–‡•‘–‡†‹–Ї
Ȁ™‘—ކ„‡”‡˜‹‡™‡†ƒ––Šƒ–’‘‹–Ǥ
͵Ǥ ENVIRONMENTAL CHECKLIST FORMǦއƒ•‡†‡ˆ‹‡‘™‡”•Š‹’‘ˆ–Ї‘ŽŽ‡‰‡ƒ” ”‹˜‡„”‹†‰‡Ǥ
ͶǤ MULTIPLE SECTIONS Ǧ ‘ŽŽ‡‰‡ ƒ” ”‹˜‡ ‹• –Ї ‘Ž› ‘ŽŽ‡‰‡ ƒ” ‡•– ‹‰”‡••Ȁ‡‰”‡••’‘‹–Ǥ —ŽŽ”‘ƒ†
Ž‘•—”‡•™‹ŽŽ‘–„‡’‡”‹––‡†ƒ–ƒ›’‘‹–ǡ”‡‰ƒ”†Ž‡•• ‘ˆ  ‹’ƒ
–•Ǥ ŽŽ ‘†‹ˆ‹‡† ƒ

‡•• —•– ƒ

‘‘†ƒ–‡ ‡‡”‰‡
› ”‡•’‘•‡
˜‡Š‹
އ•Ǥ —ŽŽƒ

‡••–‘†‹•‘ƒ”—•–„‡ƒ‹–ƒ‹‡†ƒ–ƒŽŽ–‹‡•Ǥ
Comment SB-2
Comment SB-3
Comment SB-4
Comment SB-5
Comment SB-1
Comment Letter SB
3 ͷǤ Section XIII NOISEȂ–Ї‘ŽŽ‡‰‡ƒ””‹˜‡™‘”‹•‹ Ž‘•‡’”‘š‹‹–›–‘”‡•‹†‡
‡•
ƒ† †‹•‘ ƒ”Ǥ   Ǧͳ •ŠƒŽŽ ‹
Ž—†‡ ’”‘˜‹•‹‘• –‘ ’”‘˜‹†‡ •‘—† ‹–‹‰ƒ–‹‘
„ƒ””‹‡”•ƒ•‡
‡••ƒ”›ƒ†ƒ•”‡“—‡•–‡†„›–Ї‹–›Ǥ
͸Ǥ Section XV PUBLIC SERVICES Ǧ ‘•–”—
–‹‘ ‘–‹ˆ‹
ƒ–‹‘• •ŠƒŽŽ „‡ ’”‘˜‹†‡† –‘
‹†‹˜‹†—ƒŽ’ƒ”
‡Ž•ƒ–އƒ•––‡ȋͳͲȌ†ƒ›•ƒ†–™‘ȋʹȌ†ƒ›•’”‹‘”–‘
‘•–”—
–‹‘Ǥ
͹Ǥ Section XV PUBLIC SERVICESǦ’’Ž‹
ƒ–•ŠƒŽŽ„‡”‡•’‘•‹„އ ˆ‘”ƒ

‘‘†ƒ–‹‰
ƒ†
‘‘”†‹ƒ–‹‰ƒŽŽ’”‘‰”ƒƒ–‹
ƒ
–‹˜‹–‹‡•‹’ƒ
–‡†„›–Ї”‘Œ‡
–Ǥ
ͺǤ Section XVII TRANSPORTATION Ȃ ŽŽ –”ƒˆˆ‹

‘–”‘Ž ’Žƒ• ƒˆˆ‡
–‹‰ ‘ŽŽ‡‰‡ ƒ”
‡•–ƒ

‡••ƒ†Ȁ‘”™‹–Š‹–Ї‹–›ǯ•Œ—”‹•†‹
–‹‘ƒŽ„‘—†ƒ”‹‡••ŠƒŽŽ„‡”‡˜‹‡™‡†ƒ†
ƒ’’”‘˜‡†„›–Ї‹–›Ǥ
Ї ‹–› Ž‘‘• ˆ‘”™ƒ”† –‘
‘‘”†‹ƒ–‹‰ ™‹–Š ‘‰ ‡ƒ
Š –‹Ž‹–‹‡• ‡’ƒ”–‡– ‹
‹†‡–‹ˆ›‹‰ ƒ† ‹–‹‰ƒ–‹‰ ”‘Œ‡
– ‹’ƒ
–•Ǥ  
ˆ ›‘— Šƒ˜‡ “—‡•–‹‘• ”‡‰ƒ”†‹‰ –Š‹•
އ––‡”ǡ’އƒ•‡
‘–ƒ
–‡ƒ–ȋͷ͸ʹȌͶ͵ͳǦʹͷʹ͹šͳ͵ʹʹ‘”‹Ž‡‡̷•‡ƒŽ„‡ƒ
Š
ƒǤ‰‘˜Ǥ
‹
‡”‡Ž›ǡ

”‹•‡‡
‹”‡
–‘”‘ˆ—„Ž‹
‘”•

ǣ
‹ŽŽ
‰”ƒǡ‹–›ƒƒ‰‡”
 އšƒ‹––އǡ‹”‡
–‘”‘ˆ‘—‹–›‡˜‡Ž‘’‡–
 ƒ–Š”›‡Š‘ǡ‡’—–›‹”‡
–‘”Ȁ‹–›‰‹‡‡”
Comment SB-6
Comment SB-7
Comment SB-8
Comment SB-9
4 Long Beach Utilities Department
Initial Study/Mitigated Negative Declaration (Response to Comments) for the Long Beach Utilities Department/LADWP Haynes Generating Station Recycled Water Pipeline Project 5 April 10, 2024

2.1 City of Seal Beach
Comment Identifier: SB
Date Response Received: 1/24/2024
Response to Comment SB-1
This comment provides introductory remarks and a brief description of the proposed project.

The comment does not contain any substantive comments or questions about the environmental analysis or conclusions contained in the Public Review Draft IS/MND. No further response is required.

Response to Comment SB-2
This comment states the project operations within the City of Seal Beach’s jurisdictional boundaries will require a franchise agreement and/or easement.

LBUD acknowledges this comment. LBUD will obtain a franchise agreement and/or easement for the project activities occurring within the City of Seal Beach prior to construction.

Response to Comment SB-3
This comment states the City of Seal Beach shall be included as a “Public Agency whose Approval is Required,” and as such the City of Seal Beach would review design and construction-related items noted in the IS/MND.

LBUD acknowledges this comment. The suggested revision for Section 1, Environmental Checklist Form – Other Public Agencies whose Approval is Required, of the Public Review Draft IS/MND is included in Section 1 of the Final IS/MND. No additional revisions are required. This would be considered a clarification to the IS/MND, and thus would not require recirculation of the IS/MND (State CEQA Guidelines Section 15073.5). LBUD will send over applicable plan sheets to the City of Seal Beach for their review and approval.

Long Beach Utilities Department
Initial Study/Mitigated Negative Declaration (Response to Comments) for the Long Beach Utilities Department/LADWP Haynes Generating Station Recycled Water Pipeline Project 6 April 10, 2024
Response to Comment SB-4
This comment requests the ownership of the College Park Drive bridge be defined.

LBUD acknowledges this comment. The suggested revision for Section 1, Environmental Checklist Form, of the Public Review Draft IS/MND is included in Section 1 of the Final IS/MND. No additional revisions are required. This would be considered a clarification to the IS/MND, and thus would not require recirculation of the IS/MND (State CEQA Guidelines Section 15073.5).

Response to Comment SB-5
This comment states College Park Drive is the only College Park West ingress/egress point, and full road closures of College Park Drive will not be permitted at any point. In addition, all modified access must accommodate emergency response vehicles and full access to Edison Park must be maintained.

LBUD acknowledges this comment. As discussed in Section 4.17 Transportation of the Public Review Draft IS/MND, the project will implement a mitigation measure (MM) that requires the preparation and approval of specific traffic control plans (TCP) for each phase of the project. Revisions for Mitigation Measure TR-1 within Section 4.17 Transportation, of the Public Review Draft IS/MND are included in Section 4.17 Transportation of the Final IS/MND.

The mitigation measure has been revised to include the City of Seal Beach and Caltrans as a reviewer and specifies coordinating with Caltrans for any applicable permits.

MM TR-1: Prepare Standard Traffic Control Plan (TCP). During the final engineering phase and at least 30 days prior to construction, a construction TCP shall be prepared by the contractor and reviewed and approved by the lead agency. All traffic control plans shall be provided to the City of Seal Beach and Caltrans for review. In addition, coordination with Caltrans shall occur regarding the Project’s need for any Caltrans permits.

The lane/street closures in the construction TCP shall be coordinated between the construction contractor, private businesses, public transit and bus operators, emergency service providers, and residents to minimize construction-related vehicular traffic impacts. During planned closures, traffic shall be re-routed to adjacent streets via clearly marked detours and notice shall be provided in advance to applicable parties (nearby residences, emergency service providers, public transit and bus operators, businesses, and organizers of special events). The TCP shall identify proposed closure schedules and detour routes, as well as construction traffic routes, including haul truck routes, and preferred delivery/haul-out location and hours to avoid heavily congested areas during peak hours, where feasible.

The traffic control plans will coordinate necessary lane and/or street closures between the contractor, private businesses, public transit, emergency service providers, and residents. LBUD has included in the Contract Documents that the construction Contractor will be required to include the following provisions within the project’s traffic control plans: 1) no full road closures of College Park Drive are allowed, 2) full access to Edison Park shall be maintained, and 3) accommodate emergency access throughout construction. In addition, this project will have fulltime third-party Construction Management and inspection services under the supervision of LBUD who will ensure the mitigation measure and provisions are strictly adhered to.

Long Beach Utilities Department
Initial Study/Mitigated Negative Declaration (Response to Comments) for the Long Beach Utilities Department/LADWP Haynes Generating Station Recycled Water Pipeline Project 7 April 10, 2024
Response to Comment SB-6
This comment states due to proximity of College Park Drive construction work to Edison Park, Mitigation Measure Noise-1 shall include provisions to provide sound mitigation barriers as necessary and as requested by the City of Seal Beach.

LBUD acknowledges this comment. As discussed in Section 4.13 Noise of the Public Review Draft IS/MND, the project would implement a mitigation measure that would reduce the potential impacts associated with construction noise. The mitigation measure would limit construction activities to time and day restrictions as established in the City of Long Beach and City of Seal Beach noise ordinances. LBUD will require the Contractor and/or Construction Manager to adhere to the City of Seal Beach noise ordinance and include the noise specifications within the project’s contract documents. The increase in noise caused by the project would be temporary and periodic, only occurring for the duration of construction adjacent to Edison Park, within the City of Seal Beach (approximately one week). Noise impacts would be linear and moving along the project alignment (approximately 100-200 linear feet per day). As such, the project was found to have less than significant noise impact with implementation of mitigation measures.

Response to Comment SB-7
This comment states construction notifications shall be provided to individual parcels at least ten (10) days and two (2) days prior to construction.

LBUD acknowledges this comment. LBUD will require the Contractor and/or Construction Manager to notify individual parcels at least ten (10) days and two (2) days prior to construction. The comment does not contain any substantive comments or questions about the environmental analysis, or conclusions contained in the Draft IS/MND; thus, no further response is required.

Response to Comment SB-8
This comment states the Project applicant shall be responsible for accommodating and coordinating all programmatic activities impacted by the Project.

LBUD acknowledges this comment. This project will have full-time third-party Construction Management and inspection services under the supervision of LBUD who will ensure a pre-construction meeting is held, projectrelated notifications are provided, and all traffic control plans and Contract requirements are strictly adhered to.

Long Beach Utilities Department
Initial Study/Mitigated Negative Declaration (Response to Comments) for the Long Beach Utilities Department/LADWP Haynes Generating Station Recycled Water Pipeline Project 8 April 10, 2024
Response to Comment SB-9
This comment states all traffic control plans affecting College Park Drive access and/or within the City of Seal Beach’s jurisdictional boundaries shall be reviewed and approved by the City of Seal Beach.

LBUD acknowledges this comment. LBUD will require the Contractor to provide traffic control plans for all phases of the project to the City of Seal Beach prior to construction. Revisions for Mitigation Measure TR-1 within Section

4.17 Transportation, of the Public Review Draft IS/MND are included in Section 4.17 Transportation of the Final IS/MND. The mitigation measure has been revised to include the City of Seal Beach and Caltrans as a reviewer. The comment does not contain any substantive comments or questions about the environmental analysis, or conclusions contained in the Draft IS/MND; thus, no further response is required.

Long Beach Utilities Department
IS/MND – Response to Comments
October 2, 2024 | 21

2.5 City of Seal Beach

2.5.1 Comment Letter
SB-1
SB-2
SB-3
SB-4
Long Beach Utilities Department
IS/MND – Response to Comments
22 | October 2, 2024
SB-5
SB-6
SB-7
SB-8
SB-9
SB-10
SB-11
SB-12
SB-13
Long Beach Utilities Department
IS/MND – Response to Comments
October 2, 2024 | 23

2.5.2 Responses to Comments
Below are LBUD’s responses to comments received from the City of Seal Beach for the Draft IS/MND on July 9, 2024.

SB-1 This comment provides introductory remarks and a brief description of the proposed Project and does not contain any substantive comments or questions about the environmental analysis or conclusions contained in the Draft IS/MND.

SB-2 This comment states that the Project operations within the City of Seal Beach’s jurisdictional boundaries will require a franchise agreement and/or easement. LBUD appreciates the City of Seal Beach’s input and will coordinate with Seal Beach on acquiring a franchise agreement and/or easement for components of the Project that overlap with Seal Beach’s jurisdiction. Table 2-1 of the Draft IS/MND acknowledges Seal Beach’s role in the Project’s regulatory approvals. These coordination activities will occur as part of the Project’s final design and prior to construction.

SB-3 This comment states that the Project’s current alignment is conceptual and that the City of Seal Beach would need a detailed alignment to determine the specific impacts within its jurisdictional boundary. This comment is correct; however, LBUD notes that the Project’s impacts have been conservatively estimated and assessed in the Draft IS/MND. LBUD will share the Project’s final design plans with the City of Seal Beach once available to coordinate permit requirements and any temporary construction or permanent easements.

SB-4 This comment states that the IS/MND assumes Seal Beach will approve associated permits and agreements but should also discuss alternatives in case these discretionary instruments are not approved. LBUD has considered multiple route alternatives as part of the Project’s preliminary design and carried forward LBUD’s preferred alignment as part of the Project, as described and analyzed in the Draft IS/MND. The alternative routes considered by LBUD included alignments east of the San Gabriel River and within the San Gabriel River right-of-way, as well as other alignments to the west. Following consideration of these various alignments, LBUD selected the Project alignment, which maximizes opportunities for resource avoidance and minimizes direct impacts to communities within Seal Beach.

SB-5 This comment requests that the City of Seal Beach be included in the discussions about the amendment of the LACSD Sphere of Influence (SOI) to get a full understanding of how this action would affect the City. LBUD appreciates Seal Beach’s interest in the contemplated approval processes for the Project that will be required through the Orange and Los Angeles County LAFCO boundary adjustment processes, respectively. LBUD will include the City of Seal Beach in each respective LAFCO approval process so the City is informed of the timing and any corresponding effect to Seal Beach. At this time, LBUD is not aware of any impacts from the boundary adjustment that would otherwise adversely affect Seal Beach.

SB-6 This comment states that modifications to or removal of trees in Seal Beach will require a permit. LBUD acknowledges this comment and refers Seal Beach to Response SBEQCB-6.

Long Beach Utilities Department
IS/MND – Response to Comments
24 | October 2, 2024
SB-7 This comment states that impacts to eucalyptus trees will require a separate Eucalyptus Tree Permit pursuant to the Seal Beach Municipal Code. LBUD acknowledges this comment and, consistent with the revisions to MM-BR-6, would secure the appropriate tree removal permits as requested based on the Project’s final design.

SB-8 This comment states that the document should disclose that work on College Park Drive is in close proximity to residences and Edison Park. LBUD acknowledges the City of Seal Beach’s request and has added additional description to Section 3.XIII of the IS/MND, as provided in Section 3 of this document. These minor revisions are provided in Section 3 of this document and are considered a minor clarification to the IS/MND and does not constitute a substantive change to the analysis. This revision would not require recirculation of the IS/MND (State CEQA Guidelines Section 15073.5).

The following minor revisions were made to page 76, Section 3.XIII, of the IS/MND:

Construction noise levels in the project vicinity would fluctuate depending on the particular type, number, and duration of equipment usage. The effects of construction noise largely depend on the type of construction activities occurring on any given day, noise levels generated by those activities, distances to sensitive receptors, and the existing ambient noise environment.

Construction generally occurs in several phases, with each phase requiring different equipment with varying noise characteristics. Residences and park areas within 50 feet of construction in the Cities of Long Beach and Seal Beach could experience maximum noise levels during construction, as shown in Table 3.7.

SB-9 This comment states that the Impact Analysis should identify the potential to implement mitigation measures in these areas as necessary and requested by the City of Seal Beach. LBUD has considered potential noise impacts from construction as provided in Section 3.XIII of the Draft IS/MND, which includes MM-NOI-1 and NOI-2 to mitigate for potential noise impacts during Project construction. As provided, once constructed, there are no new permanent noise sources associated with the Project that would otherwise result in permanent long-term increases in existing ambient noise levels.

SB-10 This comment states that construction notifications shall be provided to individual parcels at least 10 to 2 days prior to construction. LBUD acknowledges this comment and will require the Contractor and/or Construction Manager to notify individual parcels at least 10 days prior to construction per LBUD’s standard specification 01 10

03. SB-11 This comment states that the Project applicant shall be responsible for accommodating and coordinating all programmatic activities implemented by the Project. LBUD acknowledges this comment and will coordinate the Project’s final design with Seal Beach to avoid conflicts with other projects and coordinate installation based on input from Seal Beach. Additionally, LBUD will have full-time, third-party Construction Management and inspection services for the Project to coordinate pre-construction meetings and related notifications.

Long Beach Utilities Department
IS/MND – Response to Comments
October 2, 2024 | 25
SB-12 This comment identifies College Park Drive as the only College Park West ingress/egress point, and states that full road closures will not be permitted at any point. Additionally, the comment states that all modified access must accommodate emergency response vehicles, and full access to Edison Park must be maintained at all times. As discussed in Section 3.XVII, Transportation, of the Draft IS/MND, the Project will implement Mitigation Measure MM-TR-1, which requires the preparation and approval of specific traffic control plans for each phase of the Project. The traffic control plans will coordinate necessary lane and/or street closures between the contractor, private businesses, public transit, emergency service providers, and residents. LBUD has modified MM-TR-1 to include the following provisions within the Project’s traffic control plans: 1) no full road closures of College Park Drive are allowed; 2) full access to public parks shall be maintained; and 3) emergency access shall be accommodated throughout construction. Additionally, LBUD will include these measures in the Project’s contract documents so they are enforceable during construction. These minor revisions are provided in Section 3 of this document. This would be considered a minor clarification to the IS/MND and does not constitute a substantive change to the analysis. This revision would not require recirculation of the IS/MND (State CEQA Guidelines Section 15073.5).

The following minor revisions were made to MM-TR-6 under Section 3.XVII and Appendix E (MMRP) of the IS/MND:

MM TR 1: Prepare Standard Traffic Control Plan (TCP).

During the final engineering phase and at least 30 days prior to construction, a construction TCP shall be prepared by the contractor and reviewed and approved by the lead agency, City of Long Beach/LBUD.

The lane/street and bike trail closures in the construction TCP shall be coordinated between the construction contractor, private businesses, public transit and bus operators, emergency service providers, and residents to minimize construction related vehicular traffic impacts. During planned closures, traffic shall be rerouted to adjacent streets via clearly marked detours and notice shall be provided in advance to applicable parties (nearby residences, emergency service providers, public transit and bus operators, the bicycle community, businesses, and organizers of special events). The TCP shall identify proposed closure schedules and detour routes, as well as construction traffic routes, including haul truck routes, and preferred delivery/haul out locations and hours so as to avoid heavily congested areas during peak hours, where feasible. The following provisions shall be included in the TCP:
• Access to adjacent residences and public parks shall be maintained during business hours via existing or temporary driveways, and residences at all times, as feasible.
• Advance notice signs shall be posted prior to construction in areas where access to residences could be affected.
• Los Angeles Department of Transportation, Long Beach, Seal Beach, and Caltrans shall be provided an opportunity to review and comment on the Long Beach Utilities Department
IS/MND – Response to Comments
26 | October 2, 2024
TCP for each phase of Project construction and notified in advance of street closures, detours, or temporary lane reductions. No full road closures of College Park Drive are allowed.
• Construction activities will occur outside of peak hours. • Proposed detour routes for pedestrian and bicycle traffic along San Gabriel River Bike Trail if required.
• Emergency access shall be accommodated throughout construction.

SB-13 This comment states that all traffic plans affecting College Park West access and/or within the City of Seal Beach’s jurisdictional boundaries shall be reviewed and approved by the City. LBUD acknowledges this comment and notes that this requirement is contained in MM-TR-1. No additional changes to the Draft IS/MND are required in response to this comment.
20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com

STRUCTURAL ANALYSIS OF COLLEGE PARK DRIVE BRIDGE

FOR PIPELINE ADDITION
16” OR 24” WATER PIPE WITH 8” SEWER PIPE

BRIDGE RATING REPORT
KLEINFELDER PROJECT # 20233246.001A
June 30, 2026
Copyright 2026 Kleinfelder
All Rights Reserved

ONLY THE CLIENT OR ITS DESIGNATED REPRESENTATIVES MAY USE THIS DOCUMENT AND ONLY FOR THE SPECIFIC PROJECT FOR WHICH THIS REPORT WAS PREPARED.

Page 1 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
A Report Prepared for: City of Long Beach Utilities
Dennis Santos, PE
Manager of Engineering – Development Services
Long Beach Utilities
1800 E Wardlow Rd
Long Beach, CA 90807
Prepared by: Hao Xu, P.E.

Name
Project Professional
Reviewed by: Kelly Burnell, P.E.

Name
Senior Program Manager

KLEINFELDER
770 First Avenue, Suite 400
San Diego, CA 92101
Phone: 619-831-4600
June 30, 2026
Kleinfelder Project No: 20233246.001A

Page 2 ends

12/31/2026
20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
1 EXECUTIVE SUMMARY
___________________________________________________________________________________ The City of Long Beach Utilities requested a structural analysis of the existing College Park Drive Bridge to assess the feasibility of adding a pipeline on each side of the bridge overhang while maintaining the bridge’s structural integrity. The Kleinfelder team performed a field visit to confirm findings of the current Bridge Inspection Report and performed a load rating analysis with the intent of identifying potential deficiencies of the bridge. The bridge was analyzed using CSI Bridge software to reflect the overall performance in the bridge superstructure and piers.

The addition of the proposed pipelines does not significantly affect the bridge’s load carrying capacity nor push any components below load carrying requirements.

The site visit validated the information provided in the Bridge Inspection Report. The bridge condition was observed to be consistent with the findings of the inspection report. The site visit confirmed that rebar is exposed and corroded around the middle-lower surfaces of several piers. No immediate critical deficiencies were identified in the bridge superstructure. See Section 2 of this report for discussion of the site visit.

Two scenarios were considered in this rating analysis. The first scenario includes the installation of a 16- inch water pipe on the north side and an 8-inch sewer pipeline encased within a 16-inch casing on the south side. The second scenario considers upsizing the north-side water pipe to 24 inches while adding the same sewer pipeline configuration on the south side. Based on the results of the load rating analysis, the bridge superstructure with the proposed pipelines added has sufficient capacity for the design operating rating and all legal vehicles. A rating analysis of the existing bridge prior to the addition of the pipelines was also performed, by comparing the rating scores of proposed and existing conditions. The proposed pipe loading has a maximum impact of 6.42% in scenario one and 12.3% in scenario two on the exterior girder ratings. Table 1 and 2 summarize the results of the final bridge condition for these two scenarios with the additional pipelines as presented below:

Page 3 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
Table 1: Load Rating Summary for Scenario 1
Table 2: Load Rating Summary for Scenario 2
Additionally, given the existing damage to the bridge piers, an analysis was performed to check the bending and axial capacity of the pier with the additional loads from the proposed pipelines. The analysis assumed the corroded rebars were ineffective. The analysis results show the damaged pier has sufficient structural capacity to resist the loading during the normal daily operation and vehicle travel with the proposed pipeline loads added.

Page 4 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
2 DOCUMENT REVIEW AND SITE VISIT
___________________________________________________________________________________ The College Park Drive Bridge is a reinforced concrete girder bridge spanning 350 feet and 6 inches across the San Gabriel River. Originally constructed in 1964, the bridge consists of eight spans and a superstructure measuring 39 feet and 11 inches in width. It accommodates two traffic lanes, one in each direction, a sidewalk on the north side, and a small curb along the south side with concrete railings on both sides of the bridge. The superstructure is comprised of six T-girders integrated with a 6 1/8-inchthick deck with overhangs. Seven symmetrically spaced pier walls support the bridge across the river.

These pier walls are fixed-fixed at pier 4,5&6 and are fixed-pinned at pier 2,3,7&8. Expansion bearings at the abutments provide support for each girder. In 2010, the abutments were modified to include shear keys on each girder as part of a seismic retrofit. There are two existing utilities suspended from the exterior bridge girders, a 12-inch water pipe on the north side and a 16-inch oil pipe on the south side.

It is our understanding that a bridge preventative maintenance plan to repair the spalling and corrosion of the piers is underway.

2.1 NEW PIPELINES TO THE BRIDGE
The Long Beach Water Department is proposing to install two new utility pipes above the existing utility pipes on both sides of the bridge. Two alternatives are being considered for the north side: a 16-inch or a 24-inch welded steel recycled water pipeline. On the south side, an 8-inch sewer pipeline encased within a 16-inch casing is proposed. Both pipelines will be supported by steel framing systems attached to the exterior girders and deck overhangs of the bridge. The two north-side pipeline alternatives are evaluated separately in this report.

2.2 BRIDGE SITE VISIT
A field visit was conducted to evaluate the existing bridge condition. The site inspection included a visual assessment of the overall bridge, focusing on the superstructure, pier walls (observed from both sides of the river channel), and abutment shear keys. The purpose of the visit was to verify the condition assessment outlined in the Bridge Inspection Report and identify any new deficiencies, if present.

Page 5 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com

2.2.1 Bridge Deck
The bridge deck and sidewalk exhibit aged concrete with signs of delamination and hairline cracks. There are multiple areas of spalled concrete on the deck surface, exposing underlying aggregate and potentially reinforcing steel (Figure 2). The deck overhang shows concrete loss along the edge corner, with exposed bottom rebar on the north side (Figure 6). Concrete corner damage is commonly observed on the bridge rails (Figure 3). Additionally, sections of the sidewalk and curbs have areas where the concrete cover has deteriorated, exposing the rebar to the surface (Figures 4 and 5). Although these types of damage are found on the bridge deck, they remain localized and are unlikely to compromise the overall performance of the bridge superstructure, confirming the deck condition is “Fair” as rated in the inspection report.

Figure 1: Bridge Looking West Figure 2: Bridge Deck Eastbound Figure 3: Bridge Rail Damage Figure 4: Bridge South Curb Surface

Page 6 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
Figure 5: Bridge Sidewalk Damage Figure 6: Bridge North Overhang

2.2.2 Bridge Girders
No major damage was found on the bridge girders or deck soffit. Minor efflorescence and hairline cracks are present but do not pose a concern for structural integrity or load-bearing capacity. Overall, the girders remain in good condition.

Figure 7: Deck Soffit and Girder 1 Figure 8: Deck Soffit and Girder 2

2.2.3 Bridge Piers
The piers were observed from both ends of the riverbank. Rebar exposures were observed on both faces of pier 4,5,6 and 7. Pier 4 has significant signs of deterioration, particularly at the waterline and lower sections. There is visible concrete spalling, exposing vertical reinforcement bars, which suggests longterm water damage and corrosion. The concrete surface has cracks and delamination, further indicating material degradation (Figure 13,14). Per 5,6 and 7 all have similar deterioration but to a lesser scale at the edge of the pier (Figure 15,16). The bridge pier near the waterline undergoes a biological growth,

Page 7 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
with rough-textured layer of marine growth, likely mussels, or barnacles, having accumulated on the submerged portion of the pier. While not a hazard by itself, the biological growth can make inspection of the concrete at those locations difficult. The overall condition of the pier appears structurally intact, though the biological growth and water exposure indicate that continued routine inspections for potential deterioration over time are important (Figure 17). These routine inspections are currently performed by Los Angeles County Department of Public Works.

The pile cap and piles have been reported as exposed and affected by scour. Since the structure is submerged, the condition of these elements could not be assessed during the site visit.

Figure 9: Piers Looking Southwest Figure 10: Piers Looking Southeast Figure 11: Piers Looking Northwest Figure 12: Pier Looking Northeast

Page 8 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
Figure 13: Pier 4 East Face Figure 14: Pier 4 East Face 2 Figure 15: Pier 5(Front) & 6 West Face Figure 16: Pier 5 East Face Figure 17: Marine Growth on Pier Figure 18: Pier 8 North

Page 9 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com

2.2.4 Bridge Abutment
A seismic retrofit of the bridge abutment was completed in 2010. The newly poured concrete shear keys and the steel bearing plates attached to the girders are in good condition. Cracks were noted on the concrete shear key, and paint spalling on the steel plate indicating likely signs of stress concentration at the engaged faces. No damage was observed in the bearing assembly or anchor bolts. Overall, the abutments remain in good condition.

Figure 19: Bridge East Abutment
Figure 20: Bridge Shear Key Figure 21: Bridge Bearing

2.2.5 Existing Utilities and Other Considerations
The existing utilities on each side of the bridge are in good condition, with no visible deformation or damage to the pipes. The connection and support frames remain intact, with no signs of steel buckling or missing bolts observed during the site visit. However, at the northeast corner of the bridge, where the pipe is buried underground, a small water stream was noticed on the ground surface, indicating a potential underground leakage at this location (Figure24). It is our understanding that a repair of this leak is planned.

Page 10 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
A beehive was also observed at the northeast abutment, within the bridge expansion joint. The hive could pose environmental concerns and may require careful removal to prevent further issues. (Figure 25)

Figure 22: South Utility Pipe Figure 23: North Utility Pipe

Figure 24: Northeast Utility Pipe Figure 25: Beehive at East Abutment

2.3 SEISMIC CONSIDERATION OF PIPELINE ADDITION
Caltrans Structure Technical Policy 16.1 provides guidance on seismic design considerations for bridge modification that add mass or increase demands on existing components.

For seismic evaluation and design, bridge modification is classified as Minor or Major modification. Only Major modification to the bridge requires seismic evaluation and retrofit of the structure. To satisfy Major modification, the increase in mass due to additions needs to exceed 20% of the existing

Page 11 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
superstructure mass. The calculation below shows the added weight of the proposed utilities, including the existing utility pipes previously installed and is determined to be 10.75 percent of the total superstructure weight for Scenario 2. Therefore, seismic modifications are not required due to the pipeline additions.

Table 3: Superstructure Weight Comparison
The bridge underwent a seismic retrofit in the early 2000’s. The intention of this retrofit was to prevent collapse of the superstructure spans through the addition of shear keys and restrainers. The seismic retrofit did not upgrade the substructure of the bridge.

Page 12 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
3 BRIDGE LOAD RATING
___________________________________________________________________________________ To assess the feasibility and impact of adding two additional pipelines while maintaining the bridge’s structural integrity, a load rating analysis was performed. The load rating follows the Caltrans Bridge Load Rating Manual (Caltrans Rating Manual) 2nd edition 2022, which references to the Manual for Bridge Evaluation (MBE) and the AASHTO LRFD Bridge Design Specifications with CA Amendments.

Load ratings provide a consistent method of analyzing the current condition of the bridge to safely carry expected vehicular loads. Load ratings are used to determine if a bridge needs to be posted for reduced loads.

3.1 LOAD RATING OVERVIEW
The bridge load rating follows the requirements specified in Section 3 of the Caltrans Rating Manual.

Per the Caltrans Rating Manual Section 2.8, only the primary superstructure element requires load rating. Also, the manual indicates the deck of conventionally reinforced concrete bridge supported on girders carrying normal traffic in good to fair condition need not be load rated. Therefore, for this structure the bridge girders are the only element requiring load rating. This is consistent with the pipelines being added to the exterior girder where their loading will have the primary impact.

Based on the Caltrans Rating Manual Section 3.7, reinforced concrete girder bridge should be load rated using the Load and Resistance Factor Ratings (LRFR) method. The Strength Limit States used for Design loading at Strength I (Inventory and Operating) and Strength II levels use the following load factors. Per Caltrans Rating Manual 3.7.4.1, the Service Limit State does not require evaluation for reinforced concrete girder bridges.

Table 4: Strength Level Load Factors

Page 13 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
The Live Load for the loading rating includes the two Vehicle Classes. • Design Vehicle - HS20-44
• Legal Vehicles – Type 3, Type 3S2 and Type 3-3
It is noted on the As-Built Plans that H20-44 was used in the original bridge design, however, HS20-44 is used to be consistent with the load rating data shown on the Bridge Inspection Report. The Permit Vehicles were not rated in this bridge rating analysis.

The Load Rating Equation used is as follows,
• The C in the equation is the capacity of the bridge element expressed as C=φc x φs x φRn.

The φc is the Condition Factor defined in the MBE. Based on the Inspection Report and site visit observation, the bridge deck is in “fair” condition and the girder is ”Satisfactory,” therefore a Conditional Factor of 0.95 is used.

Table 5: Condition Factors
The φs is the System Factor defined in the MBE and represents the level of redundancy of the superstructure system, which for a multi-girder bridge, 1.0 is used.

Table 6: System Factors
 =
 − 
( +

)

Page 14 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
φRn is the capacity of the bridge element with reduction factor. • The γD is the permanent load with Strength Level Load Factors. In this analysis, the self-weight of the bridge, including the existing and proposed utility pipes are considered. • The γ (LL+IM) is the Live Load with Strength Level Load Factors, including the Dynamic Allowance (IM) based on the AASHTO Caltrans Amendments which is taken as 33% for Strength I Design Vehicle and 25% for Strength II Legal Vehicles.

Table 7: Dynamic Allowance IM

3.2 BRIDGE MODEL AND DESIGN LOAD ASSUMPTIONS

3.2.1 Bridge Geometry
A 3D model was developed using the CSI Bridge software to model the entire bridge superstructure and piers to capture the Dead Load and Live Load condition of the bridge.

Figure 26: Bridge Model

Page 15 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
The superstructure has eight continuous spans with pier walls. The pier walls are fixed-fixed at pier 4,5&6 and fixed at top and pined to the footing at pier 2,3,7&8. The abutments are modeled as roller bearing links.

The bridge deck and girders are modeled in the bridge cross section which includes the fillet on each side of the girders. The intermediate and end diaphragms are also modeled as part of the bridge superstructure.

Figure 27 Bridge Cross Section
The girder layout also includes variable web width at each end, modeled to capture the variable section values.

Figure 28: Typical Girder Plan View

Page 16 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
The pier wall is modeled as a single frame element similar to a column, supporting the bridge at each span. The height of the pier is measured from the bottom of the girder to the top of the footing. Based on the as-built plans, the following pier height are used.

Table 8: Pier Height

3.2.2 Dead Load
The Dead Load of the Bridge Deck, Girder, Diaphragms and Piers are auto calculated in the CSI Bridge Software based on the geometry defined. There is no Wearing Surface on the Bridge. The Dead Load of the Sidewalk, Curb, Rails and Utilities on both sides of the Bridge are defined as user load inputs.

Per Caltrans Rating Manual Section 4.5.5.5, the weight of the Sidewalk, Curb and Rails are distributed evenly to all girders. In the model, the weight of those components is defined as surface load applied to the entire bridge deck area. The weight calculation for each component can be found in the attached calculations.

Figure 29: Sidewalk Load on Deck
The existing and new proposed utility pipes are attached to the exterior girders and deck. There are two existing pipes: a 12 in. water pipe on the north side and a 16 in. oil pipe on the south side. The details of

Page 17 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
the existing pipes are not provided in the documents. With the absence of this information, the selfweight of the existing pipes and water inside are estimated based on the Memo to Load Raters 11-5.

Table 9: Utility Weight Table
The two proposed utility pipes are taken from the design plans provided by the City and are a 16 in. welded steel water pipe on the north side and 8 in. encased sewer pipe on the south side. The selfweight of those pipes and support beams are calculated. Without detailed plans, the alternative 24 in. water pipe assumed using XS standard pipe and with a 10% increase of the total weight to account for the weight of supports.

The utility load is concentrated at each connection support and the spacing varies along each side. In the model this is simplified as a line load applied on both sides of the bridge. The existing pipes’ self-weight are directly attached to the exterior girders, they are modeled with a 1 ft. offset from the edge of the deck. The new utility pipes self-weight is modeled at the edge of the deck.

Page 18 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
Figure 30: Existing & New Utility Load
The self-weight of the pipes will be distributed to all girders based on the girder geometry within the model. Based on the model results, the dead load distribution from the exterior girder to the first and second interior girder is around 55%, 35%, and 10%, respectively. This is slightly different from the Memo to Load Raters Section 11-5 statement, which uses a more approximate method of 75% of the utility weight is distributed to the exterior girder and 25% to the first interior girder.

3.2.3 Live Load
The Live Load for the loading rating includes the two Vehicle Classes and four types of trucks. The Pedestrian Load on the sidewalk is not considered in this load rating analysis as per MBE Section 6A.2.3.4.
• Design Vehicle - HS20-44
Figure 31: HS20 Loading

Page 19 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
• Legal Vehicles – Type 3, Type 3S2 and Type 3-3
Figure 32: Legal Vehicles Loading
Based on the Bridge Cross Section the total roadway width is 36 ft. between the sidewalk and the curb and contains two traffic lanes. For load rating purposes, the traffic load is not considered to occur over the sidewalk. The lane limit in the bridge model is restricted between the sidewalk and curbs.

Figure 33: Live Load Lane Width

Page 20 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
Two floating traffic lanes are defined in the model, each lane is considered 12 ft. wide containing a 10 ft. wide truck and can be placed side by side at any offset within the overall 32 ft. bridge width.

Figure 34: Lane Data
For each vehicle type, it is allowed to have up to two lanes on the bridge simultaneously, with the Multiple Presence Factor of 1.2 for one lane or 1.0 for two lanes. The dynamic allowance IM is applied to each type of vehicle, which for the Design Vehicle under Strength I, 33% is used, and for the Legal Vehicles under Strength II, 25% is used. The live load distribution to each girder is based on the geometry of the bridge and the lane location, as calculated by the software.

The lane load does not apply in general load cases. However, For the Type 3-3 vehicle, MBE Section 6A.4.4.2.1a requires that when analyzing the negative moment of the girder, a lane load of 0.2 klf combined with two Type 3-3 vehicles heading in the same direction separated by 30 ft. should also be considered. Per AASHTO 3.6.3.1, the negative bending at interior piers should also consider 90% of two HS20 design tracks spaced at minimum of 50 ft. placed in adjacent spans. Those additional load cases are defined in the bridge model.

Page 21 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
Per MBE Section C 6A.2.3.1, the longitudinal load due to the truck braking force should only be considered when longitudinal stability of the structure is a concern. Since the stability of a multi-piers bridge is not an issue, the braking force is not considered in the bridge rating.

3.2.4 Environmental Load
The environmental load cases such as Wind Load, Seismic Load, Stream Load or Temperature, Creep and Shrinkage are not considered in the load rating per the MBE.

3.3 BRIDGE DEMAND AND CAPACITY
The factored moment and shear demand at the entire bridge section or at each girder are obtained from the modeled results. The maximum positive moment is taken as the maximum value near the middle span. The maximum negative moment is taken at the face of the pier wall, which is 9 in. away from the center of the pier. The Maximum shear force is taken as “D” away from the centerline of the pier, “D” is the superstructure depth, which is about 3 ft.

Figure 35: A Typical Loading Diaphragm (Strength I HS20, Entire Deck)

Page 22 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
The summary of the maximum moment and shear demands for all spans is listed below.

Table 10: Summary of Maximum Moment and Shear Demand (Entire Bridge) In general, the bridge design uses the same rebar detail for shear reinforcement. Span 1,2,7,8 contain one less bottom longitudinal rebar than Spans 3-6. The reduced positive bending capacity at those four spans are investigated.

Table 11: Summary of Maximum Positive Moment Demand (At Span 1,2,7,8) The top longitudinal reinforcement at Piers 2 & 8 are two rebar less than the typical interior piers. The reduced negative bending capacity at those two piers is also investigated. The interior girder negative moment rating was found to be governed by the bending at Pier 2. The summary of the negative maximum moment at Pier 2 & 8 is shown in the table below.

Page 23 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
Table 12: Summary of Maximum Negative Moment and Shear Demand (At Pier 2&8) The moment and shear capacities in the calculation package are based on the AASHTO Section 5.

Based on the as-built plans, the following material properties are used:
f`c=3.0 ksi Concrete Strength
fy=40.0 ksi Rebar Strength
The bridge girders are treated as T-beams with the effective flange width defined per Memo to Load Raters 11-6. In this case, since the Girder Spacing/Span ratio is less than 0.32, the full tributary width of the deck can be used as the effective flange width. Per the plan details, 5-#11 bars are placed at the bottom of the girder at middle span in spans 3-6, while 4-#11 bars are used in the other shorter spans. 8-#10 bars are used at the top for negative bending at piers 3-7 and 6-#10 bars are used at piers 2 & 8.

There are #4 continuous longitudinal bars at the bottom of the deck between each girder. Those bars are also considered contributing to the negative bending capacity.

The summary of factored girder moment capacity at the middle span and at the face of the pier wall are listed in the table below. The moment at location of where the longitudinal rebar terminates are also checked under the Strength I load combination to ensure the section capacity is sufficient.

Table 13: Girder Moment Capacity
The shear capacity is taken as the girder only section. The flange deck concrete is ignored in the shear capacity check. The shear stirrups near the middle piers use #5 @ 9 in., the stirrups spacing near Piers 2&8 are increased to #5 @ 12 in. The girder has horizontal flares at the last 5 ft. from the span end.

Page 24 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
Since the critical shear location is at “D” away from the centerline of pier, the girder width is also taken at the same location which is about 3 ft. away at each end. The Shear Analysis Method is using the AASHTO Appendix B5 General Procedure with Tables as this is the recommended first alternative per the Memo to Load Raters Section 15-1.

The summary of factored shear capacity at “D” away from the pier is listed below. Notice that since the Appendix B5 General Procedure for Shear Design with Tables is used, the shear capacity is interactive with the moment demand at same location, resulting in the shear capacity varies slightly on each load case.

Table 14: Girder Shear Capacity

3.4 BRIDGE RATING RESULTS
The table below shows the final bridge rating factors for both exterior girders and the controlling interior girder. The rating results for the Design Vehicle Operating and Legal Vehicles are satisfactory for all girders. The rating results for the Design Vehicle Inventory Rating indicate the bridge interior girder and south exterior girder rate below 1.0 for the Design Vehicle Inventory case. This is reasonable because the original design vehicle for the bridge was a lighter truck than the HS20 and the safety factors used for Inventory rating are higher than normal operational rating factors. This rating factor under 1.0 for the Inventory condition does not result in a need to post or limit vehicular use of the bridge.

Table 15: Rating Scores Final Bridge (Scenario 1)

Page 25 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
Table 16: Rating Scores Final Bridge (Scenario 2)
The current bridge, without the newly proposed pipe additions, was also rated and the results are provided in the table below. It shows the same pattern where the legal and operating ratings are satisfactory, but the inventory design vehicle rating is below 1.0.

Table 17: Rating Scores Existing Bridge
By comparing the three tables, the rating results indicate that the additional weight of the proposed pipes reduces the rating factor of the north exterior girder by 6.42% in Scenario 1 and 12.3% in Scenario

2. The south exterior girder is affected by 5.01% in Scenario 1 and 5.23% in Scenario 2. The interior girder has less than 3% difference in both scenarios. These results suggest that the proposed utility pipelines should have a minimal impact on the structural integrity of the existing bridge.

Page 26 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
4 PIER CAPACITY CHECK
___________________________________________________________________________________ Based on the field visit and Bridge Inspection Report, the existing bridge piers show signs of deterioration at the waterline and lower sections. There is visible concrete spalling and exposed vertical reinforcement bars, which suggest long-term water damage and corrosion. The reduced capacity of the piers was investigated to assess the structure condition with the additional proposed pipeline weight considered.

Per the as-built plan, the pier vertical rebars are #8@12 inch spacing and they are not confined by the horizontal reinforcement. The piers are fixed at the top to the superstructure and pin connected to the foundation at Piers 2,3,7&8, and fix connected at Piers 4,5,6. In all eight piers, Pier 4 exhibits the most severe rebar exposure along the horizontal surface above the waterline height. The worst face is the east face of Pier 4, where 25 vertical exposed rebars were counted along a similar height. This constitutes about 2/3 of the total vertical reinforcement on one side of that cross-section. For that reason, the calculations focus on the Pier 4 capacity, assuming conservatively those bars are no longer effective under bending or axial loads.

Figure 36: Pier 4 Rebar Exposure
The structure analysis uses the LRFD method to determine the Demand / Capacity Ratio (DCR) of the pier under bending in the bridge longitudinal direction and concurrent axial force. The Strength I Limit State loading with 24-inch waterpipe load scenario is considered. The pier bending in the bridge’s

Page 27 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
longitudinal direction is primarily controlled by the braking force of the design vehicles and the thermal expansion due to the temperature change. The 3D model is utilized to obtain the Dead Load, Live Load, Braking, and Thermal forces from the bridge.

The moment demand due to the temperature change is based on the uniform temperature Procedure A per AASHTO Caltrans Amendments. The temperature change is taken as half of the total temperature range which is 35 F°+/-. The thermal coefficient per AASHTO is taken as 0.000006 in./in./F°. Since the bridge has symmetric span and substructure height configurations with roller bearings at the abutments, it is assumed that the expansion or contraction of the superstructure will be evenly distributed towards both abutments. Piers 2 & 8 will undergo the most top thermal demands, while Pier 5 will see negligible thermal loading.

The longitudinal load due to the truck braking force is also considered in the model. Since the lane load does not apply in general cases, 25% of the axle weight of the design vehicle is used to determine the braking force.

The maximum moment and the axial forces under Strength I from the 3D bridge model is tabulated below:

Table 18: Strength I Moment and Axial Demand
Since Pier 4 is the component under the investigation for condition reasons, the calculation checks the Pier 4 reduced capacity vs. the total demand of thermal, DL+LL, and braking. It is noticed that the cross section of where the exposed rebar is at the lower portion of the pier, and for a fixed-fixed pier, the moment demand is reduced at the middle height of the pier. Since the corrosion extension of the rebar is unknown, it is assumed that the critical moment section is taken at the waterline which is the lower 1/4 height of the pier. By visually counting the exposed rebar, the bending cross section assumes total 25 tension rebars are lost when calculating the reduced moment capacity. The bending capacity is checked utilizing the software SPColumn. Based on the calculation result, the DCR for the moment at Pier 4 is 0.92. The pier is determined to still be structurally sound despite the current levels of corrosion.

Page 28 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
Table 19: Strength I Moment and Axial Demand Along the Height of Pier 4 Figure 37: SP Column Model
Table 20: Moment DCR
Our understanding is that a pier repair project is currently planned for the bridge. Repair of the deteriorated bridge pier walls to prevent further damage is recommended. The loose, delaminated concrete surface needs to be removed to expose the corroded reinforcing steel. The exposed rebar should be cleaned using abrasive blasting or wire brushing to remove rust and scale, followed by the application of surface sealer or coating. Severely corroded bars may be supplemented or replaced as needed to restore the original reinforcement configuration. High-performance, non-shrink repair mortar or shotcrete will be placed to rebuild the damaged concrete surface, followed by appropriate curing methods to ensure strength development.

Page 29 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com
5 CONCLUSIONS
___________________________________________________________________________________

1. The addition of the proposed utility pipelines does not significantly affect the bridge’s load carrying capacity nor does it push any components below load carrying requirements.

2. The observations from the site visit confirmed the condition assessment in the Bridge Inspection Report.
• The bridge deck exhibits minor concrete damage, including efflorescence and hairline cracks. However, these do not affect structural integrity. The bridge girders remain in good condition with no major damage.
• The piers show varying degrees of deterioration, spalling and exposed rebar, with significant corrosion observed. The submerged portions of the piers also show biological growth, which may make inspection difficult.
• The abutments, retrofitted in 2010, are in generally good condition, with minor cracks in the shear key and paint spalling on the steel bearing plates observed. • Existing utility pipes are in good condition, though minor leakage may be occurring at the northeast corner of the bridge. A beehive was also observed at the east abutment.

3. Load Rating Results indicate that the Design Vehicle Operating and Legal Vehicles have satisfactory ratings for normal vehicle operation. The addition of the two proposed utility pipes has a minimal impact on the bridge’s structural integrity.

4. A capacity check of the piers, especially Pier 4, reveals the piers still meet structural requirements with reserve capacity despite the corrosion and loss reinforcement.

5. While the bridge remains structurally sound, the piers, particularly Pier 4, require monitoring and repair to arrest the deterioration. Continued regular inspection of the bridge as is currently underway by Los Angeles County Department of Public Works and maintenance of the piers, deck, and utilities are recommended to ensure continued structural integrity. The addition of the pipes will not complicate the future repair of the pier damage and can reasonably be performed prior to the repair project.

6. The repairs outlined in the Inspection report on the bridge should be performed.

Page 30 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com

APPENDIX A

PROJECT PLANS
___________________________________________________________________________________

Page 31 ends
Page 32 ends
Page 33 ends
Page 34 ends
Page 35 ends
Page 36 ends
Page 37 ends
Page 38 ends

SCALE:

FILE:
4 DETAIL
C07 1"=1'-0"
201326-C10.DWG
PROJECT NO.

LAST SAVED BY: FILE NAME:

DES
DWN
CHK C10 REO-0123
14 BRIDGE PIPE SUPPORT

DETAILS
201326-C10.dwg asimon
201326
1/22/2024 11:14:32 AM Plot Date:

DIRECTOR OF ENGINEERING / CHIEF ENGINEER

MANAGER OF ENGINEERING

APPROVED

RECOMMENDED

DEPARTMENT DATE
BY CK'D.

CITY ENG.

VERIZON
EDISON CO.

LB ENERGY
FIRE

INPUT BY

AS-BUILT BY

POSTED GIS

CONSTRUCTED BY

GIS TILE
SPEC. NO

SECTION MAP

SERVICE ATLAS PAGE
GATE VALVES REC.

SCALE 1"= 40'
N/A
CONTRACT NO.

CHECKED BY

DESIGNED BY
DATE
DATE

CORRECTED BY
DATE
DATE
DATE
DATE
__
DATE __/__/__

VARIOUS
REV. DATE DESCRIPTION SHEET OF SHEETS
DRAWING / FILE NUMBER:

FAMIS PROJECT: WAR86
DATE
DATE
CHRISTOPHER J. GARNER

GENERAL MANAGER

LADWP HAYNES GENERATING

STATION RECYCLED WATER PIPELINE
__/__/__
DRAFT 100% SUBMITTAL NOT FOR CONSTRUCTION
N/A
MUNIS PROJECT: 6005030010
47 No. 76961

LONG BEACH UTILITIES DEPARTMENT

SUPPORT LOCATION

SEE SECTION A
16" WELDED STEEL

PIPE (EL&C)
WEST
SCALE:

ELEVATION
A
-

FOR CONTINUATION,
SEE DWG C-07 FOR CONTINUATION,
SEE DWG C-07
78+00 77+00 76+00 75+00
STA 78+38.39
16" FORCE BALANCED

FLEXIBLE EXPANSION JOINT

BY EBBA IRON REFER TO
SPECIFIATION SECTION 33 05 35

FOR ADDITIONAL REQUIREMENTS
STA 75+01.88
16" FORCE BALANCED

FLEXIBLE EXPANSION JOINT

BY EBBA IRON REFER TO
SPECIFIATION SECTION 33 05 35

FOR ADDITIONAL REQUIREMENTS
EAST
CONSTRUCT 3" AV/AR
SEE DWG C17, TYPICAL
DETAIL P240

NO SCALE
COLB BRIDGE NO. 53C0139
NOTES:

1. ALL STRUCTURAL STEEL SHAPES AND PLATES SHALL BE ASTM A572 GR 50.

2. ALL WELDING ELECTRODES SHALL BE E70XX.

3. ALL STRUCTURAL STEEL, PLATES, AND C-CLAMPS SHALL BE HOT DIP GALVANIZED ACCORDING TO ASTM A153.

4. ALL ANCHORS SHALL BE HOT DIP GALVANIZED PER ASTM F1554 GR. 55.

5. PIPE SUPPORTS NEAREST FORCE BALANCED FLEXIBLE EXPANSION JOINT SHALL BE SHIMMED WITH STEEL WASHER PLATE TO PROVIDE 1/4" CLEARANCE BETWEEN PIPE AND CLAMP. 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 266'-8" 20'-0" 20'-0" SCALE:

FILE:

A SECTION
- 1"=1'-0"
201326-C10.DWG
5 -
6 -
(2) L4x3x1/2
1" DIA U-BOLT WITH 1-1/2" WIDE X 11/16"
THICK THERMOPLASTIC ISOLATOR. FIG
100-TPI BY PIPING TECHNOLOGY AND
PRODUCTS INC. OR APPROVED EQUAL
16" WELDED STEEL

PIPE (EL&C)
(1/2" WALL THICKNESS)
C15x40

EXISTING
12" WATER PIPE

PROTECT IN PLACE

EXISTING COLLEGE PARK

DRIVE BRIDGE STRUCTURE
(BRIDGE NO. 53C0139)
7 -
SCALE:

FILE:
5 DETAIL
- 3/16"=1'-0"
201326-C10.DWG
C15x40

1.25" MIN
(TYP)
24"Lx8"Wx5/8"
(6) 3/4"Ø ANCHORS W/6" MIN EMBEDMENT. USE
HILTI HIT-RE 500 V3 OR

APPROVED EQUAL
(TYP)
3/8
TYP
SCALE:

FILE:
6 DETAIL
- 3/8"=1'-0"
201326-C10.DWG
L4x3x1/2 C15x40
1" BOLT
2"
2"
3"
2" 6"
1-3/4"
3"

EXISTING

CONCRETE
L4x3x1/2 (TYP)
(2) 3/4"Ø ANCHORS W/ 6" MIN EMBEDMENT. USE
HILTI HIT-RE 500 V3 OR

APPROVED EQUAL
SCALE:

FILE:
7 DETAIL
- 3/8"=1'-0"
201326-C10.DWG
5'-0" 8'-0" 10'-11" 20'-0" 11'-6" 8'-0" 5'-0"

SUPPORT LOCATION

SEE SECTION A (TYP)

SUPPORT LOCATION

SEE SECTION A
Digitally signed by Matthew B. Huckaby
Contact Info: Carollo Engineers, Inc.

Date: 2024.01.22 15:10:46-08'00'

Page 39 ends

EAST WEST 75+00 76+00 77+00 78+00 79+00 DIRECTOR OF ENGINEERING MANAGER OF ENGINEERING APPROVED RECOMMENDED DEPARTMENT DATE BY CK'D. CITY ENG. VERIZON EDISON CO. LB ENERGY FIRE INPUT BY AS-BUILT BY POSTED GIS CONSTRUCTED BY GIS TILE SPEC. NO SECTION MAP SERVICE ATLAS PAGE GATE VALVES REC. SCALE NTS N/ACONTRACT NO. CHECKED BY DESIGNED BY DATE DATE CORRECTED BY DATE DATE DATE DATE __ DATE 09/18/23 VARIOUS REV. DATE DESCRIPTION SHEET OF SHEETS SC-0442 DRAWING / FILE NUMBER: FAMIS PROJECT: WASM-FB DATE DATE CHRISTOPHER J. GARNER GENERAL MANAGER LONG BEACH UTILITIES DEPARTMENT LADWP HAYNES GENERATING STATION SEWER FORCE MAIN PIPELINE PACKAGE 1 PH_. X_______ __/__/__ FILE NAME: SC0442.dwg DESIGN BY: PH N/A MUNIS PROJECT: 6007050019 1111 Corporate Center Dr, Suite 303 Monterey Park, CA 91754 8 10 BRIDGE PIPE SUPPORT DETAILS EXISTING COLLEGE PARK DRIVE BRIDGE STRUCTURE SUPPORT STRAP @ 12'-0" SPACING OFFSET FROM EXISTING 16" OIL PIPE SUPPORT SCALE: NTS ELEVATION STA 74+99.00 EXPANSION JOINT
STA 78+53.00 EXPANSION JOINT 16" STEEL CASING WITH 8" DIP SEWER FORCE MAIN A1 C-09B SCALE: FILE: NTS FILE SECTION - EXISTING EXISTING SUPPORT LOCATION (TYP) 2'-1" 4" 12" 0'-9 1/2" 1'-10" 1'-2 1/2" A2 C-09B SCALE: FILE: NTS FILE SECTION - NEW 16" CASING WITH 8" SEWER FM PIPELINE (2) L4x4x1/2 EXISTING COLLEGE PARK DRIVE BRIDGE STRUCTURE 2 x (4) 3/4" ANCHORS W/6" EMBEDMENT. USE HILTI HIT-RE 500 V3 OR APPROVED EQUAL 3" A1- 25' TYP 25' TYP EXISTING 16" OIL PROTECT IN PLACE C 15x40 FLATB C-10B 2 C-10B 1 C-10B3 C-10B EXISTING 16" OIL C-09B PROPOSED SUPPORT LOCATION (TYP) 12' TYP FOR CONTINUATION, SEE DWG C-07 B FOR CONTINUATION, SEE DWG C-07 B 3" 4 C-10B 5 C-10B A2- CONSTRUCT 2" AIR/VAC ASSEMBLY PER DETAIL WDS-212 1. DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO STANDARD OF THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), AS CONTAINED IN THE 15TH EDITION OF "AISC MANUAL OF STEEL CONSTRUCTION". 2. PROVIDE THE FOLLOWING MATERIALS FOR STRUCTURAL STEEL U.N.O.: a. ALL STRUCTURAL STEEL SHAPES, PLATES, ANGLES AND CHANNELS SHALL BE ASTM A36. b. MACHINE BOLTS SHALL BE ASTM A307. c. TREADED RODS FOR ANCHOR BOLTS SHALL BE ASTM F1554, GR. 36. 3. ALL STRUCTURAL AND MISCELLANEOUS STEEL SHALL BE HOT DIP GALVANIZED ACCORDING TO ASTM A153 AFTER FABRICATION. 4. WELDING OF STRUCTURAL STEEL SHALL BE PERFORMED PER AWS D1.1 & D1.8 USING E70XX ELECTRODES UNLESS OTHERWISED NOTED. 5. TESTS AND SPEICAL INSPECTION: STRUCTURAL TESTS AND SPECIAL INSPECTIONS SHALL BE PROVIDED BY A QUALIFIED TESTING AND INSPECTION AGENCY AS REQUIRED BELOW AND SHALL CONFORM TO THE REUIREMENT OF CHAPTER 17 OF THE CBC. TESTS: a. STRUCTURAL STEEL b. POST-INSTALLED ANCHORS (3/4" ROD: 7.2 K TENSION TEST LOAD U.N.O.) SPECIAL INSPECTIONS: a. SHOP & FIELD WELDING (CONTINUOUS) b. POST-INSTALLED ANCHORS (CONTINUOUS) 6. WHEN INSTALLING DRILLED-IN ANCHORS IN EXISTING NON-PRESTRESSED REINFORCED CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS. WHEN INSTALLING THEM INTO EXISTING PRESTRESSED CONCRETE (PRE-OR POST-TENSIONED) LOCATE THE PRESTRESSED TENDONS BY USING A NON-DESTRUCTIVE METHOD PRIOR TO INSTALLATION. EXERCISE EXTREME CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION. MAINTAIN A MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR. 7. FIELD VERIFY ALL CONDITIONS & DIMENSIONS PRIOR TO SHOP DRAWING PRODUCTION AND FABRICATION OF STRUCTURAL ELEMENT. 8. WHERE ALL OTHER EXISTING CONDITIONS VARY SIGNIFICANTLY FROM THOSE SHOWN ON THESE DRAWINGS, THE STRUCTURAL ENGINEER SHALL BE NOTIFIED PRIOR TO CONTINUED CONSTRUCTION RELATED TO SUBJECT CONDITIONS. NOTES TO CONTRACTOR: E N G I N E E R S I N C 2151 Michelson Dr. #240 Irvine, CA 92612 Tel. 949.679.0870 Fax. 949.679.9370 Project No.: J858 QualityV C A C I V I L Service Commitment S T R U C T U R A L MBE DBE SBE

Page 40 ends

20233246.001A June 30, 2026
© 2026 Kleinfelder www.kleinfelder.com

APPENDIX B

LOAD RATING CALCULATIONS
___________________________________________________________________________________

Page 41 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26San Diego, CA 92101 Checked:

SUMMARY RESULTS

1.81 1.79 2.67 0.96 0.96 0.94 1.08 0.99 1.132.35 2.33 4.16 1.25 1.35 1.45 1.40 1.28 1.753.67 4.05 8.36 1.80 2.09 2.20 2.20 2.21 3.063.95 3.53 8.36 1.92 1.88 2.34 2.36 2.22 3.374.39 3.24 9.00 2.19 1.81 2.64 2.67 1.95 3.641.76 1.68 2.56 0.95 0.96 0.94 1.05 0.94 1.082.28 2.18 4.00 1.24 1.34 1.44 1.36 1.22 1.693.56 3.79 8.07 1.78 2.08 2.20 2.14 2.10 2.973.83 3.34 8.12 1.90 1.87 2.33 2.30 2.11 3.264.26 3.03 8.73 2.17 1.78 2.64 2.59 1.85 3.53

2.99% 6.42% 4.20% 1.09% 1.56% 0.19% 2.75% 5.01% 3.81%
Type 3S2 Vehicle
Type 3-3 Vehicle
Final Bridge with New 16" Water Pipe and 8" Sewer Pipe
Shear
V
Mid-Span
Moment
End Span
Moment
End Shear
V
HS20 Vehicle Inventory
Mid-Span
Moment
End Span
Moment
End Shear
V
Mid-Span
Moment
End Span
Moment
Rating Vehicle
North Exterior Girder
North Exterior Girder Interior Girder South Exterior Girder End Shear
V
HS20 Vehicle Operating
End Span
Moment
Interior Girder
Mid-Span
Moment
End Span
Moment
South Exterior Girder
Rating Factor
Type 3-3 Vehicle
Rating Factor
Existing Bridge Without New Utility
Impact Due to New Pipes
Rating Vehicle
HS20 Vehicle Inventory
HS20 Vehicle Operating
Type 3 Vehicle
Type 3S2 Vehicle
Shear
V
Mid-Span
Moment
End Span
Moment
End Shear
V
Type 3 Vehicle
Mid-Span
Moment

Page 42 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26San Diego, CA 92101 Checked:

1.72 1.57 2.46 0.96 0.96 0.94 1.06 0.94 1.082.23 2.04 3.86 1.24 1.33 1.45 1.38 1.21 1.693.48 3.55 7.80 1.79 2.09 2.20 2.17 2.10 2.963.74 3.21 7.87 1.91 1.88 2.33 2.33 2.11 3.254.17 2.84 8.46 2.17 1.76 2.64 2.63 1.85 3.51

5.13% 12.30% 8.02% 0.81% 2.32% 0.18% 1.41% 5.23% 4.21%
Final Bridge with New 24" Water Pipe and 8" Sewer Pipe
Rating Vehicle
Rating Factor
North Exterior Girder Interior Girder South Exterior Girder Mid-Span
Moment
End Span
Moment
End Shear
V
Mid-Span
Moment
End Span
Moment
Shear
V
Mid-Span
Moment
End Span
Moment
End Shear
V
Impact Due to New Pipes
HS20 Vehicle Inventory
HS20 Vehicle Operating
Type 3 Vehicle
Type 3S2 Vehicle
Type 3-3 Vehicle

Page 43 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26
San Diego, CA 92101 Checked:

DEAD LOAD
γconcrete = 150 pcf Unitweight of Concrete γwater = 62.4 pcf Unitweight of Water γsteel = 490 pcf Unitweight of Steel
Bridge Deck
ddeck = 6.125 in Bridge Deck Depth
dtotal = 37 in Total Typical Section Depth
wgirder = 14 in Typical Girder Width
bdeck.ext = 22.5 in Clear Deck Width at Overhang
bdeck.in = 35 in Clear 1/2 Deck Width Between Girder
Agirder.e = Exterior Girder Area
Aslab.e = Exterior Slab Area
Agirder.i = Interior Girder Area
Aslab.i = Interior Slab Area
Additional Concrete at Girder Flare
Girder End Flare: Girder-Deck Joint Fillet:

Span #: 1&8 2&7 3 to 6 Adeck.f.e = 39 in^2 Exterior Joint Fillet Span Length: 35.4 ft 41.6 ft 50.0 ft (3.875"+16")*3.875"/2 Top Area Typ Girder: 5943 in^2 6993 in^2 8400 in^2 Adeck.f.i = 15 in^2 Interior Joint Fillet Exterior Girder Flare Area: 90 in^2 180 in^2 180 in^2 (3.875"*3.875") Exterior Girder Increase%: 1.5% 2.6% 2.1%
Interior Girder Flare Area: 180 in^2 360 in^2 360 in^2
Interior Girder Increase%: 3.0% 5.1% 4.3%
(Flare as additional weight of girder)
Girder Total Unit Weight:

Span #: 1&8 2&7 3 to 6
Adeck.e= 6.36 ft^2 6.39 ft^2 6.37 ft^2 Total Area of One Bridge Exterior Girder with Deck Adeck.i= 6.77 ft^2 6.83 ft^2 6.81 ft^2 Total Area of One Bridge Interior Girder with Deck wdeck.e = 0.95 klf 0.96 klf 0.96 klf Unit Weight of Exterior Girder and Deck wdeck.i = 1.02 klf 1.03 klf 1.02 klf Unit Weight of Interior Girder and Deck

3.0 ft^2

3.6 ft^2

3.0 ft^2

3.0 ft^2

Page 44 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26
San Diego, CA 92101 Checked:

Sidewalk (North) Curb (South)
dsidewalk = 9.9 in Average Sidewalk Depth dcurb = 9 in Curb Depth bsidewalk = 72 in Sidewalk Width Bcurb = 23 in Curb Width Asidewalk = 5.0 ft^2 Area of Sidewalk Asidewalk = 1.4 ft^2 Area of Curb wsidewalk = 0.743 klf Unit Weight of Sidewalk wcurb = 0.216 klf Unit Weight of Curb Bridge Rail (North) Bridge Rail (South)
hrail = 36 in Height of Rail hrail = 28 in Height of Rail drail = 6 in Width of Rail drail = 6 in Width of Rail
hopening = 18.25 in Height of Rail Opening hopening = 20.25 in Height of Rail Opening wopening = 10 in Width of Rail Opening wopening = 6 in Width of Rail Opening Sopening = 17 in Opening Spacing Sopening = 17 in Opening Spacing hrail.eq = 25.26 in Equivalent Height of Rail hrail.eq = 20.85 in Equivalent Height of Rail (assume solid rail, 6" wide) (assume solid rail, 6" wide) drail.add = 2 in Additional Rail Width drail.add = 8 in Additional Rail Width hrail.max = 11.5 in Height of Wider Rail (8"+3.5") hrail.max = 3.5 in Height of Wider Rail Arail.n = 1.2 ft^2 Area of Rail Arail.s = 1.1 ft^2 Area of Rail wrail.n = 0.182 klf Unit Weight of Rail wrail.s = 0.159 klf Unit Weight of Rail Per Caltrans Bridge Load Rating Manual 4.5.5.5, The dead load of the Barrier and Sidewalk(Curb) is distributed to all girders.

Wdeck = 39.92 ft Total Deck Width
wrail.tot = 0.009 ksf Weight of two Rails Uniformly Distribute to Entire Bridge Surface ws.walk.tot = 0.024 ksf Weight of Sidewalk+Curb Uniformly Distribute to Entire Bridge Surface

Page 45 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26
San Diego, CA 92101 Checked:

Intermediate Diaphragm
ddiaph.i = 24.88 in Intermediate Diaphragm Depth (Without slab) wdiaph.i = 10 in Intermediate Diaphragm Width
Ldiaph.i = 70 in Intermediate Diaphragm Length Between Girder Adiaph.i f = 4 in^2 Fillet 2"x2" Both Sides
Adiaph.i = 1.8 ft^2 Intermediate Diaphragm Area
Pdiaph.i = 0.8 k Point DL at Midspan of Girder
(The diaphragm is modeled as actural element at span2-7) Pier Diaphragm
ddiaph.p = 30.88 in Pier Diaphragm Depth (Without slab) wdiaph.p = 18 in Pier Diaphragm Width
Ldiaph.p = 84 in Pier Diaphragm Length Between Girder
Adiaph.p f = 4 in^2 Fillet 2"x2" Both Sides
Adiaph.p = 3.9 ft^2 Pier Diaphragm Area
Pdiaph.p = 2.0 k Point DL at End Span of Girder
End Diaphragm
ddiaph.e = 32.88 in End Diaphragm Depth (Without slab)
wdiaph.e = 18 in End Diaphragm Width
Ldiaph.e = 84 in End Diaphragm Length Between Girder
Adiaph.e f = 2 in^2 Fillet 2"x2" One Sides
Adiaph.i = 4.1 ft^2 Intermediate Diaphragm Area
Pdiaph.i = 2.2 k Point DL at Abutment

Page 46 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26
San Diego, CA 92101 Checked:

Utility
In the absence of specific information of the existing pipe, the weight is estimated base on the Caltrans Memo to Load Raters 11-5.

Existing Pipe North (12" Dia Water)
(Self-weight assumed base on the Memo to Rator Table )
wpipe.n.e = 0.120 klf Unit Weight Existing Pipe North
Spipe.n.exi = 25 ft Support Spacing
Ppipe.n.exi = 3.0 k Total Wt. Per Support
New Pipe North ( Two Alternatives)
Alternative 1:(16" Dia Water Weld Steel with 1/2" Wall Thickness) (Self-weight calculated base on the utility drawing provided) Pipe
Dod.s.new = 16.0 in Out Diameter of New Pipe
Did.s.new = 15.0 in Inner Diameter of New Pipe
Apipe.s.new = 24 in^2 Steel Pipe Area
Awater.s.new = 177 in^2 Pipe inside Area
wpipe.s.new = 0.159 klf Unit Weight New Pipe Filled with Water Spipe.s.new = 20 ft Support Spacing
Pipe Support
C 15x40 L= 48 in w= 40 plf Wt.= 160 lb
L 4x3x1/2 L= 30 in w= 11.1 plf No.= 2 Wt.= 55 lb
Total Wt.= 215 lb per support
Ppipe.s.new = 3.4 k Total Wt. Per Support at New Pipe
or 0.170 klf Uniformly Distributed along Deck Edge
Alternative 2:(24" Dia Water Pipe)
(Without a design plan, the 24" pipe assumes to use 24XS pipe with 1/2" wall thickness. Add 10% for support weight ) Pipe
Dod.s.new = 24.0 in Out Diameter of New Pipe
Did.s.new = 23.0 in Inner Diameter of New Pipe
Apipe.s.new = 37 in^2 Steel Pipe Area
Awater.s.new = 415 in^2 Pipe inside Area
wpipe.s.new = 0.306 klf Unit Weight New Pipe Filled with Water Spipe.s.new = 20 ft Support Spacing assumed
Ppipe.s.new = 6.7 k Total Wt. Per Support at New Pipe
or 0.336 klf Uniformly Distributed along Deck Edge
Total wt. include additional 10% for
assumed connection and support
(simple clamp used for pipe connection,
support wt negligible )

Page 47 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26
San Diego, CA 92101 Checked:

Existing Pipe South (16" Dia Oil)
(Self-weight assumed base on the Memo to Rator Table )
wpipe.s.exi = 0.193 klf Unit Weight Existing Pipe South Spipe.s.exi = 24 ft Support Spacing
Ppipe.s.exi = 5.1 k Total Wt. Per Support
or 0.212 klf Uniformly Distributed along Deck Edge
Total wt. include additional 10% for
assumed connection and support
New Pipe South (16" Casing with 8" sewer FM Pipeline)
(Self-weight assumed base on the Memo to Rator Table )
Pipe
Dod.s.new.c = 16.00 in Out Diameter of New Pipe Casing
Did.s.new.c = 15.25 in Inner Diameter of New Pipe Casing Apipe.s.new.c = 18.4 in^2 Steel Casing Area
Dod.s.new = 8.625 in Out Diameter of New Pipe
Did.s.new = 7.625 in Inner Diameter of New Pipe
Apipe.s.new = 12.8 in^2 Steel Pipe Area
Awater.s.new = 45.7 in^2 Pipe inside Area
wpipe.s.new = 0.126 klf Unit Weight New Pipe Filled with Water Spipe.s.new = 24 ft Support Spacing
Pipe Support
C 15x40 L= 48 in w= 40 plf Wt.= 160 lb
L 4x4x1/2 L= 30 in w= 12.8 plf No.= 2 Wt.= 63 lb
Total Wt.= 223 lb per support
Ppipe.s.new = 3.2 k Total Wt. Per Support at New Pipe
or 0.135 klf Uniformly Distributed along Deck Edge
Compare Weight of Utility V.S Weight of Superstructure

0.96 klf x2

1.02 klf x4 0.12 klf

0.74 klf 0.19 klf

0.22 klf 0.14 klf

0.18 klf 0.17 klf 0.34 klf

0.16 klf 0.62 klf 0.78 klf

7.30 klf
New Utility N-24"
Utility All with 24"
Weight of Utility
Scenario 1 Scenario 2
Same as Scenario 1
Curb
Rail N
New Utility/
Sup.structure

8.47% New Utility/
Sup.structure

10.75%
Scenario 1 Scenario 2
Compare New Utility to the Existing Bridge
Superstructure
Utility All with 16"
Weight of Superstructure
Rail S
Existing Utility N
Existing Utility S
New Utility N-16"
New Utility S
Exterior Girder+Deck
Interior Girder+Deck
Sidewalk

Page 48 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26
San Diego, CA 92101 Checked:

LIVE LOAD
Bridge is rated for four vehicles:

Design Vehicle: HS20
Legal Vehicle: Type 3, Type 3S3, Type 3-3
The above vehicles are defined in Bridge Model

Page 49 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #:20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26San Diego, CA 92101 Checked:

GIRDER CAPACITY
Effective Flange Width(Momo to Raters 11-6)Sgirder = 7 ft Girder spacing Lspan = 35.375 ft Shortest Span length
beff =
Since: Sgirder/Lspan= 0.20 <0.32 The effective flange is taken as tributary width of the deck X Y X+Y (1/2 girder spacing+overhang or girder spacing) 22.5 in 42 in 64.5 in 71.5 in 42 in 42 in 84 in 84 in
Material f`c= 3.0 ksi Concrete Strength β= 0.85
fy= 40.0 ksi Rebar Strength
Girder Positive Bending Capacity
Ext. Girder Int. Girder Ext. Girder Int. Girder Ext. Girder Int. Girder Dgirder= 37 in 37 in 37 in 37 in 37 in 37 in Total girder depth Bgirder = 14 in 14 in 14 in 14 in 14 in 14 in Girder width Ddeck= 6.125 in 6.125 in 6.125 in 6.125 in 6.125 in 6.125 in Deck (flange) thickness beff= 71.5 in 84 in 71.5 in 84 in 71.5 in 84 in Effective flange width tcover = 1 in 1 in 1 in 1 in 1 in 1 in Clear coverNo.bars = 5 5 4 4 2 2 Number of #11 bars providedAs = 7.8 in^2 7.8 in^2 6.2 in^2 6.2 in^2 3.1 in^2 3.1 in^2 Total tension rebar areaa= 1.7 in 1.5 in 1.4 in 1.2 in 0.7 in 0.6 in Stress Block Depth As Fy/0.85f`cbf Inside Flange de.= 34.1 in 34.1 in 34.0 in 34.0 in 34.7 in 34.7 in Girder effective depth T= 312.0 k 312.0 k 249.6 k 249.6 k 124.8 k 124.8 k Atotal*fy c= 2.0 in 1.7 in 1.6 in 1.4 in 0.8 in 0.7 in a/βMn= 864.5 k-ft 867.8 k-ft 692.2 k-ft 694.4 k-ft 357.0 k-ft 357.5 k-ft Moment capacity of Girder εc= 0.003 0.003 0.003 0.003 0.003 0.003 Compression strain limit εs= 0.048 0.057 0.060 0.071 0.126 0.149 Tension strain > 0.005 Tension control φ= 0.9 0.9 0.9 0.9 0.9 0.9 Reduction factorφMn= 778.1 k-ft 781.0 k-ft 623.0 k-ft 624.9 k-ft 321.3 k-ft 321.8 k-ft Nominal Capacity Mu= 165.0 k-ft 165.0 k-ft Strength I moment at location of interestDCR= - - - - 0.51 0.51 <1 Exterior Girder
Interior Girder
bmin
Effective Flange Width
At Additional Rebar EndsAt Middle Span
At Span 3-6 At Span 1,2,7,8 At All Pier
See Bridge Rating

Page 50 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #:20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26San Diego, CA 92101 Checked:

GIRDER CAPACITY
Girder Negative Bending Capacity
Ext. Girder Int. Girder Ext. Girder Int. Girder Ext. Girder Int. Girder Ext. Girder Int. Girder Dgirder= 37 in 37 in 37 in 37 in 37 in 37 in 37 in 37 in Total girder depth Bgirder = 17 in 20 in 17 in 20 in 14 in 14 in 14 in 14 in Girder width Ddeck= 6.125 in 6.125 in 6.125 in 6.125 in 6.125 in 6.125 in 6.125 in 6.125 in Deck (flange) thickness beff= 71.5 in 84 in 71.5 in 84 in 71.5 in 84 in 71.5 in 84 in Effective flange width tcover = 1 in 1 in 1 in 1 in 1 in 1 in 1 in 1 in Clear coverAs = 10.8 in^2 11.2 in^2 8.2 in^2 8.6 in^2 4.4 in^2 3.5 in^2 4.4 in^2 3.5 in^2 Total tension rebar area Use #10(in girder)+#4(in slab) a= 9.9 in 8.8 in 7.6 in 6.8 in 4.9 in 4.0 in 4.9 in 4.0 in Stress Block Depth As Fy/0.85f`cBgirder de.= 34.6 in 34.6 in 34.6 in 34.5 in 34.5 in 34.2 in 34.5 in 34.2 in Girder effective depth T= 430.4 k 446.4 k 328.8 k 344.8 k 176.4 k 141.6 k 176.4 k 141.6 k Atotal*fy c= 11.7 in 10.3 in 8.9 in 8.0 in 5.8 in 4.7 in 5.8 in 4.7 in a/βMn= 1064.0 k-ft 1122.9 k-ft 844.0 k-ft 894.4 k-ft 470.4 k-ft 379.9 k-ft 470.4 k-ft 379.9 k-ft Moment capacity of Girder εc= 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 Compression strain limit εs= 0.006 0.007 0.009 0.010 0.015 0.019 0.015 0.019 Tension strain > 0.005 Tension control φ= 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 Reduction factorφMn= 957.6 k-ft 1010.6 k-ft 759.6 k-ft 805.0 k-ft 423.3 k-ft 341.9 k-ft 423.3 k-ft 341.9 k-ft Nominal Capacity Mu= 90.7 k-ft 148.5 k-ft 68.9 k-ft 109.1 k-ft Strength I moment at location of interestDCR= - - - - 0.21 0.43 0.16 0.32 <1 See Bridge Rating
At Pier 3-7 At Pier 2&8 At Pier 3-7 At Pier 2&8
At End Span At Additional Rebar Ends

Page 51 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #:20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26San Diego, CA 92101 Checked:

GIRDER CAPACITY
Girder Shear Capacity AASHTO Appendix B5
Kip-ft Kip Kip-ft Kip
944.0 131.4 942.1 146.3816.2 111.5 811.1 122.0634.5 83.2 649.8 93.9633.4 83.7 667.9 92.5668.2 80.6 701.6 88.0 Ext. Girder Int. Girder Ext. Girder Int. Girder Ext. Girder Int. Girder Ext. Girder Int. Girder Ext. Girder Int. Girder As= 10.8 in^2 11.2 in^2 11.2 in^2 11.2 in^2 11.2 in^2 11.2 in^2 11.2 in^2 11.2 in^2 11.2 in^2 11.2 in^2 Total longitudinal Rebar Provided:

Mu= 944.0 k-ft 942.1 k-ft 816.2 k-ft 811.1 k-ft 634.5 k-ft 649.8 k-ft 633.4 k-ft 667.9 k-ft 668.2 k-ft 701.6 k-ft Moment Demand at Location Checked:

Nu= 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k Factored Axial Force Tension (+):

Vu= 131.4 k 146.3 k 111.5 k 122.0 k 83.2 k 93.9 k 83.7 k 92.5 k 80.6 k 88.0 k Shear Demand at Location Checked:
θ= 33.9 deg 36.8 deg 36.5 deg 36.6 deg 36.4 deg 36.4 deg 36.4 deg 36.4 deg 36.4 deg 36.4 deg Guess valueEs= 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi Modulus of Elasticity Es:εx X1000= 0.74 0.71 0.60 0.61 0.46 0.49 0.46 0.49 0.48 0.51 Longitudinal Strain at Middepth:

Sx= 15.6 in 15.6 in 15.6 in 15.6 in 15.6 in 15.6 in 15.6 in 15.6 in 15.6 in 15.6 in Crack Spacing Parameter ag= 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in Maximum Aggregate Size Sxe= 21.4 in 21.4 in 21.4 in 21.4 in 21.4 in 21.4 in 21.4 in 21.4 in 21.4 in 21.4 in Crack Spacing Parameter Adjusted by a g vu= 0.30 ksi 0.30 ksi 0.25 ksi 0.25 ksi 0.19 ksi 0.19 ksi 0.19 ksi 0.19 ksi 0.18 ksi 0.18 ksi Shear Stress in Concrete:
vu/f`c= 0.100 0.101 0.085 0.084 0.063 0.065 0.064 0.064 0.061 0.061 At Pier 3-7
HS20 Vehicle Inventory
HS20 Vehicle Operating
HS20 Vehicle Operating Type 3 Vehicle Type 3S2 Vehicle Type 3-3 Vehicle Demand at End of Girder
Strength Level Demand Summary
Exterior Girder Interior Girder
Moment Shear Moment Shear
Type 3 Vehicle
Type 3S2 Vehicle
Type 3-3 Vehicle
HS20 Vehicle Inventory

Page 52 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #:20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26San Diego, CA 92101 Checked:

GIRDER CAPACITY
Ext. End Int. End Ext. End Int. End Ext. End Int. End Ext. End Int. End Ext. End Int. End β= 2.33 2.35 2.47 2.47 2.64 2.61 2.64 2.60 2.62 2.58θ= 33.9 deg 33.5 deg 31.9 deg 32.0 deg 29.9 deg 30.3 deg 29.9 deg 30.4 deg 30.2 deg 30.6 degλ= 1 1 1 1 1 1 1 1 1 1 Normal concretef`c= 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi Concrete strength bv.girder= 15.7 in 17.3 in 15.7 in 17.3 in 15.7 in 17.3 in 15.7 in 17.3 in 15.7 in 17.3 in Girder width bv.slab= 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in Slab width(not used)d1= 29.7 in 30.2 in 29.7 in 30.2 in 29.7 in 30.2 in 29.7 in 30.2 in 29.7 in 30.2 in Distance between T and a d2= 31.2 in 31.1 in 31.2 in 31.1 in 31.2 in 31.1 in 31.2 in 31.1 in 31.2 in 31.1 in 0.9de d3= 26.6 in 26.6 in 26.6 in 26.6 in 26.6 in 26.6 in 26.6 in 26.6 in 26.6 in 26.6 in 0.72Dgirderdv= 31.2 in 31.1 in 31.2 in 31.1 in 31.2 in 31.1 in 31.2 in 31.1 in 31.2 in 31.1 in Effective shear section depth 5.7.2.8 Taken max d 1,d2,d3dv.slab= 3.865 in 3.865 in 3.865 in 3.865 in 3.865 in 3.865 in 3.865 in 3.865 in 3.865 in 3.865 in Slab effective depth (not used) Vc= 62.2 k 69.1 k 66.1 k 72.7 k 70.5 k 76.9 k 70.5 k 76.5 k 69.8 k 76.0 k Shear concrete capacity db= 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in Diameter of shear reinforcement # 5 Bar n 2 2 2 2 2 2 2 2 2 2 Number of legsAv= 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 Area of reinforcementfy= 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi Shear reinforcement steels= 9.0 in 9.0 in 9.0 in 9.0 in 9.0 in 9.0 in 9.0 in 9.0 in 9.0 in 9.0 in Bar spacingVs= 126.7 k 128.0 k 136.5 k 135.6 k 147.5 k 145.3 k 147.5 k 144.5 k 145.9 k 143.2 k Shear reinforcement steel capacityφ= 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 Resistance factor for shearVn= 188.9 k 197.1 k 202.5 k 208.4 k 218.0 k 222.2 k 218.0 k 221.0 k 215.7 k 219.3 k Total shear resistanceφVn= 170.0 k 177.4 k 182.3 k 187.5 k 196.2 k 200.0 k 196.2 k 198.9 k 194.2 k 197.3 k Factored shear resistance capacity

Page 53 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #:20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26San Diego, CA 92101 Checked:

GIRDER CAPACITY
Kip-ft Kip Kip-ft Kip
722.3 119.0 788.1 138.3591.1 95.6 631.4 107.9454.9 73.4 492.1 85.8468.0 70.0 521.0 82.3464.4 67.7 512.0 76.9 Ext. Girder Int. Girder Ext. Girder Int. Girder Ext. Girder Int. Girder Ext. Girder Int. Girder Ext. Girder Int. Girder As= 8.2 in^2 8.6 in^2 8.6 in^2 8.6 in^2 8.6 in^2 8.6 in^2 8.6 in^2 8.6 in^2 8.6 in^2 8.6 in^2 Total longitudinal Rebar Provided:

Mu= 722.3 k-ft 788.1 k-ft 591.1 k-ft 631.4 k-ft 454.9 k-ft 492.1 k-ft 468.0 k-ft 521.0 k-ft 464.4 k-ft 512.0 k-ft Moment Demand at Location Checked:

Nu= 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k 0.0 k Factored Axial Force Tension (+):

Vu= 119.0 k 138.3 k 95.6 k 107.9 k 73.4 k 85.8 k 70.0 k 82.3 k 67.7 k 76.9 k Shear Demand at Location Checked:
θ= 34.5 deg 34.1 deg 32.2 deg 32.1 deg 30.1 deg 30.3 deg 30.1 deg 30.5 deg 30.0 deg 30.3 deg Guess valueEs= 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi 29000 ksi Modulus of Elasticity Es:εx X1000= 0.79 0.83 0.63 0.67 0.49 0.54 0.50 0.55 0.49 0.54 Longitudinal Strain at Middepth:

Sx= 14.8 in 15.1 in 14.8 in 15.1 in 14.8 in 15.1 in 14.8 in 15.1 in 14.8 in 15.1 in Crack Spacing Parameter ag= 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in 0.375 in Maximum Aggregate Size Sxe= 20.4 in 20.7 in 20.4 in 20.7 in 20.4 in 20.7 in 20.4 in 20.7 in 20.4 in 20.7 in Crack Spacing Parameter Adjusted by a g vu= 0.28 ksi 0.29 ksi 0.23 ksi 0.23 ksi 0.18 ksi 0.18 ksi 0.17 ksi 0.18 ksi 0.16 ksi 0.16 ksi Shear Stress in Concrete:
vu/f`c= 0.095 0.098 0.076 0.077 0.059 0.061 0.056 0.058 0.054 0.055 HS20 Vehicle Inventory HS20 Vehicle Operating Type 3 Vehicle Type 3S2 Vehicle Type 3-3 Vehicle HS20 Vehicle Inventory
HS20 Vehicle Operating
Type 3 Vehicle
Type 3S2 Vehicle
Type 3-3 Vehicle
Demand at End of Girder
Strength Level Demand Summary
North Exterior Girder Interior Girder
Moment Shear Moment Shear
At Pier2&8

Page 54 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #:20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26San Diego, CA 92101 Checked:

GIRDER CAPACITY
Ext. End Int. End Ext. End Int. End Ext. End Int. End Ext. End Int. End Ext. End Int. End β= 2.31 2.28 2.48 2.44 2.60 2.56 2.59 2.54 2.60 2.56θ= 34.4 deg 34.8 deg 32.2 deg 32.7 deg 30.4 deg 31.0 deg 30.5 deg 31.2 deg 30.4 deg 31.0 degλ= 1 1 1 1 1 1 1 1 1 1 Normal concretef`c= 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi 3.0 ksi Concrete strength bv.girder= 15.7 in 17.3 in 15.7 in 17.3 in 15.7 in 17.3 in 15.7 in 17.3 in 15.7 in 17.3 in Girder width bv.slab= 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in 0.0 in Slab width(not used)d1= 29.7 in 30.2 in 29.7 in 30.2 in 29.7 in 30.2 in 29.7 in 30.2 in 29.7 in 30.2 in Distance between T and a d2= 0.6 in 0.6 in 0.6 in 0.6 in 0.6 in 0.6 in 0.6 in 0.6 in 0.6 in 0.6 in 0.9de d3= 22.4 in 22.4 in 22.4 in 22.4 in 22.4 in 22.4 in 22.4 in 22.4 in 22.4 in 22.4 in 0.72Dgirderdv= 29.7 in 30.2 in 29.7 in 30.2 in 29.7 in 30.2 in 29.7 in 30.2 in 29.7 in 30.2 in Effective shear section depth 5.7.2.8 Taken max d 1,d2,d3dv.slab= 28.9 in 28.9 in 28.9 in 28.9 in 28.9 in 28.9 in 28.9 in 28.9 in 28.9 in 28.9 in Slab effective depth (not used) Vc= 58.6 k 65.1 k 62.9 k 69.7 k 66.0 k 73.1 k 65.8 k 72.7 k 66.1 k 73.1 k Shear concrete capacity db= 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in 0.625 in Diameter of shear reinforcement # 5 Bar n 2 2 2 2 2 2 2 2 2 2 Number of legsAv= 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 0.6 in^2 Area of reinforcementfy= 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi 40.0 ksi Shear reinforcement steels= 12.0 in 12.0 in 12.0 in 12.0 in 12.0 in 12.0 in 12.0 in 12.0 in 12.0 in 12.0 in Bar spacingVs= 88.5 k 88.7 k 96.4 k 96.0 k 103.3 k 102.8 k 103.0 k 102.0 k 103.5 k 102.8 k Shear reinforcement steel capacityφ= 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 0.9 Resistance factor for shearVn= 147.2 k 153.8 k 159.4 k 165.7 k 169.3 k 175.9 k 168.9 k 174.7 k 169.5 k 175.9 k Total shear resistanceφVn= 132.4 k 138.4 k 143.4 k 149.1 k 152.4 k 158.3 k 152.0 k 157.2 k 152.6 k 158.3 k Factored shear resistance capacity

Page 55 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26
San Diego, CA 92101 Checked:

PRIMARY GIRDER LOAD RATING
Demand Summary
Kip-ft Kip-ft Kip Kip-ft Kip-ft Kip Kip-ft Kip-ft Kip
200.0 -378.2 43.3 211.6 -369.3 40.1 206.4 -385.0 44.4
211.9 -411.6 47.6 218.5 -373.8 40.3 201.6 -386.2 44.2
306.7 -316.3 41.5 454.3 -572.8 106.3 453.2 -559.0 87.0
236.6 -244.0 32.0 350.5 -441.9 82.0 349.6 -431.2 67.1
Type 3 Vehicle 151.6 -140.1 16.1 243.4 -280.5 53.8 230.4 -249.6 38.8 140.8 -146.2 17.6 228.1 -298.6 52.4 212.4 -248.4 39.3
126.5 -175.5 16.2 200.1 -332.3 47.9 191.4 -283.2 36.2
Kip-ft Kip Kip-ft Kip Kip-ft Kip
-263.1 36.6 -239.8 32.0 -260.3 37.1
-281.1 40.1 -236.7 32.0 -268.2 37.5
-270.9 34.9 -548.3 106.3 -459.1 81.9
-193.5 24.9 -391.6 75.9 -327.9 58.5
Type 3 Vehicle -115.4 13.4 -252.3 53.8 -191.7 36.3
-137.2 12.5 -281.2 50.3 -204.8 32.9
-146.6 11.7 -272.2 44.9 -201.2 30.6
Kip-ft Kip-ft Kip-ft
165.8 160.2 174.4
181.6 159.0 168.6
225.7 454.3 398.5
174.1 350.5 307.4
Type 3 Vehicle 115.3 243.4 195.1
108.8 228.1 181.9

94.9 200.1 161.0
Dead Load with 24" Pipe
Dead Load with 24" Pipe
Dead Load with 24" Pipe
Type 3S2 Vehicle
Type 3-3 Vehicle
HS20 Vehicle Operating
Type 3S2 Vehicle
Type 3-3 Vehicle
Max Positive Moment at
Span 1,2,7,8
Dead Load with 16" Pipe
HS20 Vehicle Inventory
HS20 Vehicle Operating
Type 3S2 Vehicle
Type 3-3 Vehicle
North
Exterior
Girder
Interior
Girder
South
Exterior
Girder
Strength Level Demand
HS20 Vehicle Inventory
South
Exterior Girder
Shear
V
Negative
M
Shear
V
Negative M Shear
V
Strength Level Demand Summary
HS20 Vehicle Operating
Max
Positive M
Max
Negative M
Max
V
North Exterior Girder
Dead Load with 16" Pipe
Max
Negative M
HS20 Vehicle Inventory
South Exterior Girder
Max
Positive M
Max
Negative M
Max
V
Interior Girder
Max
Positive M
Max
V
Max Moment and Shear
at Span All Span
Dead Load with 16" Pipe
Strength Level Demand Summary
North
Exterior Girder Negative Moment and Interior Girder
Shear
at Pier 2&8 Negative M

Page 56 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26
San Diego, CA 92101 Checked:

PRIMARY GIRDER LOAD RATING
Capacity Summary
Exterior Interior Exterior Interior
Kip-ft Kip-ft Kip-ft Kip-ft
-957.6 -1010.6 778.1 781.0
-759.6 -805.0 623.0 624.9
Kip Kip Kip Kip
170.0 177.4 132.4 138.4
182.3 187.5 143.4 149.1
196.2 200.0 152.4 158.3
196.2 198.9 152.0 157.2
194.2 197.3 152.6 158.3

RATING FACTOR
Per MBE Equation 6A.4.2.1-1
φc = 0.95 Condition Factor φc φs= 0.95
φs = 1 System Factor
C= φc φs Rn Factored Capacity
γ D= Factored Permanent Load ( Bridge Selfweight+All Utilities) γ (LL+IM)= Factored Live Load at Each Limit States
At Pier 2&8
Type 3 Vehicle
Type 3S2 Vehicle
Type 3-3 Vehicle
Span End
Negative Moment
Girder Moment Capacity
At Span 3-6
At Span 1,2,7,8
Mid-Span
Positive Moment
HS20 Vehicle Inventory
HS20 Vehicle Operating
Exterior
Girder
Interior
Girder
Pier 3-7 Pier 2&8
Exterior
Girder
Interior
Girder
Girder Shear Capacity
At Pier 3-7
 
  γ
γ

Page 57 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26
San Diego, CA 92101 Checked:

PRIMARY GIRDER LOAD RATING

1.76 1.68 2.56 0.95 0.96 0.94 1.05 0.94 1.08

2.28 2.18 4.00 1.24 1.34 1.44 1.36 1.22 1.69
Type 3 Vehicle 3.56 3.79 8.07 1.78 2.08 2.20 2.14 2.10 2.97

3.83 3.34 8.12 1.90 1.87 2.33 2.30 2.11 3.26

4.26 3.03 8.73 2.17 1.78 2.64 2.59 1.85 3.53

2.99% 6.42% 4.20% 1.09% 1.56% 0.19% 2.75% 5.01% 3.81%

1.72 1.57 2.46 0.96 0.96 0.94 1.06 0.94 1.08

2.23 2.04 3.86 1.24 1.33 1.45 1.38 1.21 1.69
Type 3 Vehicle 3.48 3.55 7.80 1.79 2.09 2.20 2.17 2.10 2.96

3.74 3.21 7.87 1.91 1.88 2.33 2.33 2.11 3.25

4.17 2.84 8.46 2.17 1.76 2.64 2.63 1.85 3.51

5.13% 12.30% 8.02% 0.81% 2.32% 0.18% 1.41% 5.23% 4.21%

1.81 1.79 2.67 0.96 0.96 0.94 1.08 0.99 1.13

2.35 2.33 4.16 1.25 1.35 1.45 1.40 1.28 1.75
Type 3 Vehicle 3.67 4.05 8.36 1.80 2.09 2.20 2.20 2.21 3.06

3.95 3.53 8.36 1.92 1.88 2.34 2.36 2.22 3.37

4.39 3.24 9.00 2.19 1.81 2.64 2.67 1.95 3.64

2.99% 6.02% 4.20% 1.09% 0.63% 0.19% 2.75% 5.01% 3.81%

2.99% 6.42% 3.78% 1.09% 0.87% 0.18% 2.75% 5.01% 3.43%
Type 3 Vehicle 2.99% 6.42% 3.49% 1.09% 0.63% 0.16% 2.75% 5.01% 3.16%

2.99% 5.33% 2.96% 1.09% 0.63% 0.16% 2.75% 5.01% 3.17%

2.99% 6.42% 3.00% 1.09% 1.56% 0.16% 2.75% 5.01% 3.16%
HS20 Vehicle Inventory
HS20 Vehicle Operating
Type 3S2 Vehicle
Type 3-3 Vehicle
Rating Vehicle
Difference % V.S Existing
Type 3-3 Vehicle
HS20 Vehicle Operating
HS20 Vehicle Inventory
Difference % V.S Existing
Final Bridge with New 16" Water Pipe and 8" Sewer Pipe
End Span
Moment
Shear
V
Mid-Span
Moment
End Span
Moment
End Shear
V
Type 3S2 Vehicle
Mid-Span
Moment
End Span
Moment
End Shear
V
Mid-Span
Moment
End Span
Moment
South Exterior Girder
Rating Factor
North Exterior Girder
Mid-Span
Moment
South Exterior Girder
Mid-Span
Moment
End Span
Moment
End Shear
V
Mid-Span
Moment
End Span
Moment
Shear
V
Mid-Span
Moment
End Span
Moment
End Shear
V
Final Bridge with New 24" Water Pipe and 8" Sewer Pipe
Rating Vehicle
Rating Factor
North Exterior Girder Interior Girder South Exterior Girder Mid-Span
Moment
End Span
Moment
End Shear
V
Mid-Span
Moment
HS20 Vehicle Inventory
Mid-Span
Moment
End Span
Moment
End Shear
V
Mid-Span
Moment
End Span
Moment
Rating Factor
North Exterior Girder Interior Girder South Exterior Girder End Span
Moment
End Shear
V
Existing Bridge without New Utility
North Exterior Girder Interior Girder
HS20 Vehicle Operating
Type 3S2 Vehicle
Type 3-3 Vehicle
HS20 Vehicle Operating
Type 3S2 Vehicle
Type 3-3 Vehicle
Difference, New (16" Water Pipe+8" Sewer Pipe) vs Existing Bridge Rating Vehicle
Rating Vehicle
HS20 Vehicle Inventory
Shear
V
Mid-Span
Moment
End Span
Moment
End Shear
V
Interior Girder
Shear
V

Page 58 ends

Project: College Park Dr Bridge Load Rating Page:

Load Rating Project #: 20233246
770 First Ave, Suite 400 Designed: H Xu Date: Jun-26
San Diego, CA 92101 Checked:

PRIMARY GIRDER LOAD RATING

5.13% 11.92% 8.02% 0.81% 0.04% 0.18% 1.41% 5.23% 4.21%

5.13% 12.30% 7.22% 0.81% 1.64% 0.16% 1.41% 5.23% 3.79%
Type 3 Vehicle 5.13% 12.30% 6.67% 0.81% 0.17% 0.15% 1.41% 5.23% 3.49%

5.13% 9.03% 5.85% 0.81% 0.04% 0.15% 1.41% 5.23% 3.51%

5.13% 12.30% 5.93% 0.81% 2.32% 0.15% 1.41% 5.23% 3.49%
HS20 Vehicle Inventory
HS20 Vehicle Operating
Type 3S2 Vehicle
Type 3-3 Vehicle
Rating Vehicle
Difference, New (24" Water Pipe+8" Sewer Pipe) vs Existing Bridge North Exterior Girder Interior Girder South Exterior Girder Mid-Span
Moment
End Span
Moment
End Shear
V
Mid-Span
Moment
End Span
Moment
Shear
V
Mid-Span
Moment
End Span
Moment
End Shear
V

Page 59 ends

TABLE: Bridge Object Girder Forces
BridgeObj BridgeCut Station Span Girder GirderDist LocType OutputCaseCaseType P V2 V3 T M2 M3 GlobalX GlobalY GlobalZ Text Unitless ft Text Text ft Text Text Text Kip Kip Kip Kip-ft Kip-ft Kip-ft ft ft ft BOBJ1 1 0 Span 1 Left Exterior Girder 0 After Str I-DL Combination -0.255 -24.879 -2.613 -9.6962 4.0422 -3.7028 1.18E-15 1.75E+01 -0.7058BOBJ1 2 5 Span 1 Left Exterior Girder 5 Before Str I-DL Combination 1.33 -16.216 -3.972 -8.6608 15.4462 97.8984 5.00E+00 1.75E+01 -0.7058BOBJ1 3 5 Span 1 Left Exterior Girder 5 After Str I-DL Combination 2.905 -15.232 -3.442 -7.9859 10.4546 96.7701 5 17.5 -0.7058BOBJ1 4 13.4583 Span 1 Left Exterior Girder 13.4583 Before Str I-DL Combination 4.604 -0.149 -0.576 -1.65 22.6181 160.5754 13.4583 17.5 -0.7058BOBJ1 5 13.4583 Span 1 Left Exterior Girder 13.4583 After Str I-DL Combination 4.311 0.821 1.357 0.2652 23.6331 160.7883 13.4583 17.5 -0.7058BOBJ1 6 21.9167 Span 1 Left Exterior Girder 21.9167 Before Str I-DL Combination 1.168 15.851 4.849 7.0806 7.6267 92.5394 21.9167 17.5 -0.7058BOBJ1 7 21.9167 Span 1 Left Exterior Girder 21.9167 After Str I-DL Combination -1.43 16.836 6.3 8.5494 16.1599 94.4029 21.9167 17.5 -0.7058BOBJ1 8 30.375 Span 1 Left Exterior Girder 30.375 Before Str I-DL Combination -7.336 31.956 6.259 12.468 -19.7018 -107.69 30.375 17.5 -0.7058BOBJ1 9 30.375 Span 1 Left Exterior Girder 30.375 After Str I-DL Combination -9.647 32.945 3.346 10.5489 -12.5294 -106.031 30.375 17.5 -0.7058BOBJ1 10 35.375 Span 1 Left Exterior Girder 35.3766 Before Str I-DL Combination -10.971 41.999 -2.918 12.8213 -10.6221 -290.872 35.375 17.375 -0.8237BOBJ1 11 35.375 Span 2 Left Exterior Girder 0 After Str I-DL Combination -8.873 -38.012 3.554 -9.5931 -9.8535 -256.892 35.375 17.375 -0.8237BOBJ1 12 40.375 Span 2 Left Exterior Girder 5.0016 Before Str I-DL Combination -8.58 -28.978 -1.93 -7.2631 -13.3384 -90.9559 40.375 17.5 -0.7058BOBJ1 13 40.375 Span 2 Left Exterior Girder 5.0016 After Str I-DL Combination -7.163 -27.805 -4.38 -8.6623 -17.4439 -91.9729 40.375 17.5 -0.7058BOBJ1 14 48.2813 Span 2 Left Exterior Girder 12.9078 Before Str I-DL Combination -5.037 -14.152 -4.639 -5.1457 11.5369 72.3658 48.2813 17.5 -0.7058BOBJ1 15 48.2813 Span 2 Left Exterior Girder 12.9078 After Str I-DL Combination -3.169 -12.743 -3.187 -3.3858 5.5359 71.0298 48.2813 17.5 -0.7058BOBJ1 16 56.1875 Span 2 Left Exterior Girder 20.8141 Before Str I-DL Combination -2.108 0.889 -1.557 1.538 20.8106 117.1308 56.1875 17.5 -0.7058BOBJ1 17 56.1875 Span 2 Left Exterior Girder 20.8141 After Str I-DL Combination -2.854 2.72 3.435 0.2244 23.2907 117.6914 56.1875 17.5 -0.7058BOBJ1 18 64.0938 Span 2 Left Exterior Girder 28.7203 Before Str I-DL Combination -5.368 16.342 4.989 5.1218 -1.5734 44.1319 64.0938 17.5 -0.7058BOBJ1 19 64.0938 Span 2 Left Exterior Girder 28.7203 After Str I-DL Combination -8.509 17.73 6.226 6.7694 8.7411 46.3773 64.0938 17.5 -0.7058BOBJ1 20 72 Span 2 Left Exterior Girder 36.6266 Before Str I-DL Combination -11.593 31.354 5.366 9.9184 -27.1855 -145.455 72 17.5 -0.7058BOBJ1 21 72 Span 2 Left Exterior Girder 36.6266 After Str I-DL Combination -13.387 32.51 1.728 7.6595 -21.847 -144.166 72 17.5 -0.7058BOBJ1 22 77 Span 2 Left Exterior Girder 41.6281 Before Str I-DL Combination -13.821 41.53 -5.238 8.8951 -13.7449 -327.05 77 17.375 -0.8237BOBJ1 23 77 Span 3 Left Exterior Girder 0 After Str I-DL Combination -16.73 -46.146 5.053 -10.8052 -13.6561 -348.221 77 17.375 -0.8237BOBJ1 24 82 Span 3 Left Exterior Girder 5.0016 Before Str I-DL Combination -16.044 -37.113 -2.44 -9.3935 -20.0818 -142.807 82 17.5 -0.7058BOBJ1 25 82 Span 3 Left Exterior Girder 5.0016 After Str I-DL Combination -14.085 -36.052 -6.335 -11.9587 -25.8649 -144.211 82 17.5 -0.7058BOBJ1 26 92 Span 3 Left Exterior Girder 15.0016 Before Str I-DL Combination -7.667 -18.206 -6.768 -7.3927 22.1805 122.4693 92 17.5 -0.7058BOBJ1 27 92 Span 3 Left Exterior Girder 15.0016 After Str I-DL Combination -4.679 -17.043 -5.158 -5.5978 12.3736 120.3376 92 17.5 -0.7058BOBJ1 28 102 Span 3 Left Exterior Girder 25.0016 Before Str I-DL Combination -1.131 0.776 -2.073 1.7863 36.7424 199.1396 102 17.5 -0.7058BOBJ1 29 102 Span 3 Left Exterior Girder 25.0016 After Str I-DL Combination -1.549 1.887 3.362 -0.3424 38.099 199.4978 102 17.5 -0.7058BOBJ1 30 112 Span 3 Left Exterior Girder 35.0016 Before Str I-DL Combination -6.769 19.696 6.389 7.0234 6.8469 95.2889 112 17.5 -0.7058BOBJ1 31 112 Span 3 Left Exterior Girder 35.0016 After Str I-DL Combination -10.458 20.846 7.902 8.7658 19.0031 97.9317 112 17.5 -0.7058BOBJ1 32 122 Span 3 Left Exterior Girder 45.0016 Before Str I-DL Combination -17.773 38.655 6.695 12.8375 -33.9914 -194.344 122 17.5 -0.7058BOBJ1 33 122 Span 3 Left Exterior Girder 45.0016 After Str I-DL Combination -19.749 39.694 1.897 9.661 -28.2321 -192.923 122 17.5 -0.7058BOBJ1 34 127 Span 3 Left Exterior Girder 50.0031 Before Str I-DL Combination -20.264 48.725 -6.948 10.1765 -16.7724 -410.948 127 17.375 -0.8237BOBJ1 35 127 Span 4 Left Exterior Girder 0 After Str I-DL Combination -19.733 -47.464 6.892 -9.8437 -16.2105 -397.789 127 17.375 -0.8237 BOBJ1 36 132 Span 4 Left Exterior Girder 5.0016 Before Str I-DL Combination -19.407 -38.437 -1.555 -9.1895 -27.6857 -185.863 132 17.5 -0.7058 BOBJ1 37 132 Span 4 Left Exterior Girder 5.0016 After Str I-DL Combination -17.75 -37.397 -6.127 -12.2028 -32.3683 -187.051 132 17.5 -0.7058BOBJ1 38 142 Span 4 Left Exterior Girder 15.0016 Before Str I-DL Combination -11.306 -19.597 -7.271 -8.0461 17.592 93.2958 142 17.5 -0.7058BOBJ1 39 142 Span 4 Left Exterior Girder 15.0016 After Str I-DL Combination -8.021 -18.45 -5.775 -6.3054 6.8004 90.952 142 17.5 -0.7058BOBJ1 40 152 Span 4 Left Exterior Girder 25.0016 Before Str I-DL Combination -3.635 -0.649 -2.799 1.0263 35.0837 183.3192 152 17.5 -0.7058BOBJ1 41 152 Span 4 Left Exterior Girder 25.0016 After Str I-DL Combination -3.666 0.406 2.829 -0.8579 35.1961 183.3714 152 17.5 -0.7058BOBJ1 42 162 Span 4 Left Exterior Girder 35.0016 Before Str I-DL Combination -8.235 18.215 5.827 6.4666 7.2595 93.5097 162 17.5 -0.7058BOBJ1 43 162 Span 4 Left Exterior Girder 35.0016 After Str I-DL Combination -11.611 19.367 7.349 8.2069 18.375 95.9288 162 17.5 -0.7058BOBJ1 44 172 Span 4 Left Exterior Girder 45.0016 Before Str I-DL Combination -18.414 37.185 6.336 12.3992 -31.5836 -181.966 172 17.5 -0.7058BOBJ1 45 172 Span 4 Left Exterior Girder 45.0016 After Str I-DL Combination -20.273 38.228 1.844 9.4401 -26.1895 -180.63 172 17.5 -0.7058BOBJ1 46 177 Span 4 Left Exterior Girder 50.0031 Before Str I-DL Combination -20.753 47.259 -6.524 10.1706 -15.8567 -391.293 177 17.375 -0.8237

Page 60 ends

Total Dead Load with 16" Water Pipe
BOBJ1 47 177 Span 5 Left Exterior Girder 0 After Str I-DL Combination -20.588 -47.049 6.281 -10.3112 -15.8517 -386.095 177 17.375 -0.8237 BOBJ1 48 182 Span 5 Left Exterior Girder 5.0016 Before Str I-DL Combination -20.066 -38.018 -1.913 -9.4597 -25.5181 -176.492 182 17.5 -0.7058BOBJ1 49 182 Span 5 Left Exterior Girder 5.0016 After Str I-DL Combination -18.192 -36.969 -6.307 -12.3688 -30.9754 -177.836 182 17.5 -0.7058BOBJ1 50 192 Span 5 Left Exterior Girder 15.0016 Before Str I-DL Combination -11.455 -19.149 -7.265 -8.1399 18.6779 97.9204 192 17.5 -0.7058BOBJ1 51 192 Span 5 Left Exterior Girder 15.0016 After Str I-DL Combination -8.099 -17.994 -5.741 -6.4012 7.6179 95.5256 192 17.5 -0.7058BOBJ1 52 202 Span 5 Left Exterior Girder 25.0016 Before Str I-DL Combination -3.628 -0.185 -2.745 0.9172 35.1166 183.2336 202 17.5 -0.7058BOBJ1 53 202 Span 5 Left Exterior Girder 25.0016 After Str I-DL Combination -3.633 0.869 2.887 -0.9644 35.0958 183.1858 202 17.5 -0.7058BOBJ1 54 212 Span 5 Left Exterior Girder 35.0016 Before Str I-DL Combination -8.12 18.669 5.861 6.3713 6.3641 88.677 212 17.5 -0.7058BOBJ1 55 212 Span 5 Left Exterior Girder 35.0016 After Str I-DL Combination -11.424 19.814 7.353 8.1128 17.209 91.0447 212 17.5 -0.7058BOBJ1 56 222 Span 5 Left Exterior Girder 45.0016 Before Str I-DL Combination -17.926 37.612 6.148 12.2283 -33.0399 -191.433 222 17.5 -0.7058BOBJ1 57 222 Span 5 Left Exterior Girder 45.0016 After Str I-DL Combination -19.56 38.645 1.472 9.1613 -28.4468 -190.257 222 17.5 -0.7058BOBJ1 58 227 Span 5 Left Exterior Girder 50.0031 Before Str I-DL Combination -19.838 47.672 -7.157 9.6865 -16.2316 -403.247 227 17.375 -0.8237BOBJ1 59 227 Span 6 Left Exterior Girder 0 After Str I-DL Combination -20.065 -48.565 6.728 -10.3152 -16.79 -406.345 227 17.375 -0.8237BOBJ1 60 232 Span 6 Left Exterior Girder 5.0016 Before Str I-DL Combination -19.512 -39.534 -1.961 -9.6874 -27.6475 -189.123 232 17.5 -0.7058BOBJ1 61 232 Span 6 Left Exterior Girder 5.0016 After Str I-DL Combination -17.522 -38.49 -6.672 -12.8227 -33.4643 -190.549 232 17.5 -0.7058BOBJ1 62 242 Span 6 Left Exterior Girder 15.0016 Before Str I-DL Combination -10.263 -20.678 -7.835 -8.7217 19.3121 100.0831 242 17.5 -0.7058BOBJ1 63 242 Span 6 Left Exterior Girder 15.0016 After Str I-DL Combination -6.585 -19.526 -6.322 -6.9828 7.182 97.4583 242 17.5 -0.7058BOBJ1 64 252 Span 6 Left Exterior Girder 25.0016 Before Str I-DL Combination -1.439 -1.716 -3.301 0.3746 38.1208 199.9996 252 17.5 -0.7058BOBJ1 65 252 Span 6 Left Exterior Girder 25.0016 After Str I-DL Combination -1.046 -0.614 2.145 -1.7451 36.8204 199.6331 252 17.5 -0.7058BOBJ1 66 262 Span 6 Left Exterior Girder 35.0016 Before Str I-DL Combination -4.678 17.203 5.228 5.6476 12.1076 119.2654 262 17.5 -0.7058BOBJ1 67 262 Span 6 Left Exterior Girder 35.0016 After Str I-DL Combination -7.682 18.364 6.836 7.4478 21.9578 121.4184 262 17.5 -0.7058BOBJ1 68 272 Span 6 Left Exterior Girder 45.0016 Before Str I-DL Combination -14.175 36.208 6.368 11.9929 -26.2795 -146.785 272 17.5 -0.7058BOBJ1 69 272 Span 6 Left Exterior Girder 45.0016 After Str I-DL Combination -16.132 37.263 2.398 9.3935 -20.5116 -145.378 272 17.5 -0.7058BOBJ1 70 277 Span 6 Left Exterior Girder 50.0031 Before Str I-DL Combination -16.791 46.297 -5.23 10.7116 -13.5831 -351.556 277 17.375 -0.8237BOBJ1 71 277 Span 7 Left Exterior Girder 0 After Str I-DL Combination -13.485 -41.004 4.956 -9.0324 -13.646 -318.898 277 17.375 -0.8237BOBJ1 72 282 Span 7 Left Exterior Girder 5.0016 Before Str I-DL Combination -13.019 -31.982 -1.776 -7.6659 -21.0233 -138.631 282 17.5 -0.7058BOBJ1 73 282 Span 7 Left Exterior Girder 5.0016 After Str I-DL Combination -11.241 -30.824 -5.265 -9.8232 -26.3195 -139.908 282 17.5 -0.7058BOBJ1 74 289.9063 Span 7 Left Exterior Girder 12.9078 Before Str I-DL Combination -8.22 -17.196 -6.074 -6.6456 8.8036 47.7603 289.9063 17.5 -0.7058BOBJ1 75 289.9063 Span 7 Left Exterior Girder 12.9078 After Str I-DL Combination -5.158 -15.806 -4.826 -4.9972 -1.253 45.5719 289.9063 17.5 -0.7058BOBJ1 76 297.8125 Span 7 Left Exterior Girder 20.8141 Before Str I-DL Combination -2.731 -2.183 -3.273 -0.1047 22.6133 114.9495 297.8125 17.5 -0.7058BOBJ1 77 297.8125 Span 7 Left Exterior Girder 20.8141 After Str I-DL Combination -2.09 -0.363 1.754 -1.3614 20.4591 114.4535 297.8125 17.5 -0.7058BOBJ1 78 305.7188 Span 7 Left Exterior Girder 28.7203 Before Str I-DL Combination -3.259 13.266 3.363 3.5549 4.0662 64.2807 305.7188 17.5 -0.7058BOBJ1 79 305.7188 Span 7 Left Exterior Girder 28.7203 After Str I-DL Combination -5.201 14.669 4.759 5.2866 10.3042 65.6696 305.7188 17.5 -0.7058BOBJ1 80 313.625 Span 7 Left Exterior Girder 36.6266 Before Str I-DL Combination -7.331 28.315 4.356 8.7165 -19.0569 -102.729 313.625 17.5 -0.7058BOBJ1 81 313.625 Span 7 Left Exterior Girder 36.6266 After Str I-DL Combination -8.651 29.483 1.583 7.0987 -15.2961 -101.781 313.625 17.5 -0.7058BOBJ1 82 318.625 Span 7 Left Exterior Girder 41.6281 Before Str I-DL Combination -8.813 38.514 -4.298 9.1355 -9.4246 -270.332 318.625 17.375 -0.8237BOBJ1 83 318.625 Span 8 Left Exterior Girder 0 After Str I-DL Combination -10.195 -41.773 2.558 -12.9596 -10.9643 -281.12 318.625 17.375 -0.8237BOBJ1 84 323.625 Span 8 Left Exterior Girder 5.0016 Before Str I-DL Combination -8.861 -32.72 -3.468 -10.5052 -11.693 -97.3269 323.625 17.5 -0.7058BOBJ1 85 323.625 Span 8 Left Exterior Girder 5.0016 After Str I-DL Combination -6.588 -31.727 -6.212 -12.3169 -18.7279 -98.9552 323.625 17.5 -0.7058BOBJ1 86 332.0833 Span 8 Left Exterior Girder 13.4599 Before Str I-DL Combination -0.85 -16.601 -6.185 -8.3622 17.0357 101.2999 332.0833 17.5 -0.7058BOBJ1 87 332.0833 Span 8 Left Exterior Girder 13.4599 After Str I-DL Combination 1.666 -15.61 -4.725 -6.9068 8.7801 99.5018 332.0833 17.5 -0.7058BOBJ1 88 340.5417 Span 8 Left Exterior Girder 21.9182 Before Str I-DL Combination 4.608 -0.561 -1.23 -0.1594 24.4375 165.7853 340.5417 17.5 -0.7058BOBJ1 89 340.5417 Span 8 Left Exterior Girder 21.9182 After Str I-DL Combination 4.815 0.422 0.7 1.7031 23.7183 165.6416 340.5417 17.5 -0.7058BOBJ1 90 349 Span 8 Left Exterior Girder 30.3766 Before Str I-DL Combination 2.951 15.54 3.554 7.9043 11.151 99.5036 349 17.5 -0.7058BOBJ1 91 349 Span 8 Left Exterior Girder 30.3766 After Str I-DL Combination 1.349 16.536 4.109 8.5553 16.2235 100.6545 349 17.5 -0.7058BOBJ1 92 354 Span 8 Left Exterior Girder 35.3766 Before Str I-DL Combination -0.218 25.214 2.732 9.5261 4.0932 -2.5986 354 17.5 -0.7058BOBJ1 1 0 Span 1 Interior Girder 1 0 After Str I-DL Combination 0.399 -20.696 -2.099 -2.4489 -2.4462 8.5843 8.88E-16 1.05E+01 -0.8108BOBJ1 2 5 Span 1 Interior Girder 1 5 Before Str I-DL Combination -1.026 -13.314 -1.577 -2.0517 0.5574 94.6312 5 10.5 -0.8108BOBJ1 3 5 Span 1 Interior Girder 1 5 After Str I-DL Combination -2.733 -12.623 -1.025 -1.5566 -4.5599 95.8537 5 10.5 -0.8108

Page 61 ends

BOBJ1 4 13.4583 Span 1 Interior Girder 1 13.4583 Before Str I-DL Combination -5.486 0.322 0.9 0.5624 -5.9761 149.8891 13.4583 10.5 -0.8108 BOBJ1 5 13.4583 Span 1 Interior Girder 1 13.4583 After Str I-DL Combination -6.126 1.143 2.212 1.9264 -1.6915 150.3436 13.4583 10.5 -0.8108BOBJ1 6 21.9167 Span 1 Interior Girder 1 21.9167 Before Str I-DL Combination -5.599 14.194 4.365 4.2985 -9.7037 85.1058 21.9167 10.5 -0.8108BOBJ1 7 21.9167 Span 1 Interior Girder 1 21.9167 After Str I-DL Combination -4.532 15.026 4.92 4.9616 4.7901 84.3378 21.9167 10.5 -0.8108BOBJ1 8 30.375 Span 1 Interior Girder 1 30.375 Before Str I-DL Combination -1.579 28.026 4.134 4.6255 -3.2181 -99.8698 30.375 10.5 -0.8108BOBJ1 9 30.375 Span 1 Interior Girder 1 30.375 After Str I-DL Combination -0.497 28.759 3.325 3.942 9.2751 -100.649 30.375 10.5 -0.8108BOBJ1 10 35.375 Span 1 Interior Girder 1 35.375 Before Str I-DL Combination -0.092 36.836 2.933 3.8616 1.4693 -264.344 35.375 10.5 -0.9268BOBJ1 11 35.375 Span 2 Interior Girder 1 0 After Str I-DL Combination -1.535 -34.359 0.28 -1.0364 5.4611 -242.595 35.375 10.5 -0.9268BOBJ1 12 40.375 Span 2 Interior Girder 1 5 Before Str I-DL Combination -1.879 -26.27 -0.233 -1.4952 4.4421 -91.5273 40.375 10.5 -0.8108BOBJ1 13 40.375 Span 2 Interior Girder 1 5 After Str I-DL Combination -3.055 -25.375 -1.214 -2.2212 -1.4438 -90.6832 40.375 10.5 -0.8108BOBJ1 14 48.2813 Span 2 Interior Girder 1 12.9063 Before Str I-DL Combination -4.753 -13.624 -1.937 -2.585 2.0204 64.6967 48.2813 10.5 -0.8108BOBJ1 15 48.2813 Span 2 Interior Girder 1 12.9063 After Str I-DL Combination -6.169 -12.517 -1.416 -2.0719 -6.1272 65.7074 48.2813 10.5 -0.8108BOBJ1 16 56.1875 Span 2 Interior Girder 1 20.8125 Before Str I-DL Combination -7.185 -0.768 -0.121 -0.9195 -3.9377 118.9484 56.1875 10.5 -0.8108BOBJ1 17 56.1875 Span 2 Interior Girder 1 20.8125 After Str I-DL Combination -7.208 4.321 2.826 3.0085 1.3554 118.9616 56.1875 10.5 -0.8108BOBJ1 18 64.0938 Span 2 Interior Girder 1 28.7188 Before Str I-DL Combination -6.253 16.082 3.955 4.066 -11.1891 37.6269 64.0938 10.5 -0.8108BOBJ1 19 64.0938 Span 2 Interior Girder 1 28.7188 After Str I-DL Combination -4.971 17.216 4.092 4.35 6.3239 36.7115 64.0938 10.5 -0.8108BOBJ1 20 72 Span 2 Interior Girder 1 36.625 Before Str I-DL Combination -3.537 29.008 2.747 3.5972 -4.0821 -147.044 72 10.5 -0.8108BOBJ1 21 72 Span 2 Interior Girder 1 36.625 After Str I-DL Combination -2.739 29.934 1.21 2.4919 5.7654 -147.62 72 10.5 -0.8108BOBJ1 22 77 Span 2 Interior Girder 1 41.625 Before Str I-DL Combination -2.759 38.038 0.415 1.9362 4.8316 -316.642 77 10.5 -0.9268BOBJ1 23 77 Span 3 Interior Girder 1 0 After Str I-DL Combination -2.848 -41.921 -0.435 -2.1674 4.9859 -331.138 77 10.5 -0.9268BOBJ1 24 82 Span 3 Interior Girder 1 5 Before Str I-DL Combination -3.285 -33.834 -1.276 -2.7706 5.9768 -142.34 82 10.5 -0.8108BOBJ1 25 82 Span 3 Interior Girder 1 5 After Str I-DL Combination -4.63 -33.019 -2.776 -3.8609 -3.1376 -141.376 82 10.5 -0.8108BOBJ1 26 92 Span 3 Interior Girder 1 15 Before Str I-DL Combination -8.691 -17.658 -4.514 -4.7789 3.9973 114.9241 92 10.5 -0.8108BOBJ1 27 92 Span 3 Interior Girder 1 15 After Str I-DL Combination -10.302 -16.701 -3.97 -4.136 -11.2995 116.0698 92 10.5 -0.8108BOBJ1 28 102 Span 3 Interior Girder 1 25 Before Str I-DL Combination -12.219 -1.371 -1.084 -1.6012 -3.5472 207.7934 102 10.5 -0.8108BOBJ1 29 102 Span 3 Interior Girder 1 25 After Str I-DL Combination -12.234 3.962 2.887 3.2495 -0.5706 207.8146 102 10.5 -0.8108BOBJ1 30 112 Span 3 Interior Girder 1 35 Before Str I-DL Combination -10.337 19.311 5.6 5.6512 -13.9212 90.1323 112 10.5 -0.8108BOBJ1 31 112 Span 3 Interior Girder 1 35 After Str I-DL Combination -8.792 20.288 5.913 6.1354 6.5107 89.0228 112 10.5 -0.8108BOBJ1 32 122 Span 3 Interior Girder 1 45 Before Str I-DL Combination -5.029 35.708 3.324 4.6417 -3.3193 -193.63 122 10.5 -0.8108BOBJ1 33 122 Span 3 Interior Girder 1 45 After Str I-DL Combination -4 36.555 1.366 3.2494 7.0213 -194.373 122 10.5 -0.8108BOBJ1 34 127 Span 3 Interior Girder 1 50 Before Str I-DL Combination -3.944 44.652 0.29 2.4532 6.3009 -396.4 127 10.5 -0.9268BOBJ1 35 127 Span 4 Interior Girder 1 0 After Str I-DL Combination -4.121 -43.463 0.497 -1.7168 7.2439 -383.703 127 10.5 -0.9268BOBJ1 36 132 Span 4 Interior Girder 1 5 Before Str I-DL Combination -4.28 -35.364 -0.566 -2.5735 5.6721 -187.572 132 10.5 -0.8108BOBJ1 37 132 Span 4 Interior Girder 1 5 After Str I-DL Combination -5.358 -34.521 -2.464 -3.9029 -2.2635 -186.798 132 10.5 -0.8108BOBJ1 38 142 Span 4 Interior Girder 1 15 Before Str I-DL Combination -9.121 -19.096 -5.007 -5.3049 4.7188 83.9771 142 10.5 -0.8108BOBJ1 39 142 Span 4 Interior Girder 1 15 After Str I-DL Combination -10.733 -18.119 -4.686 -4.785 -12.647 85.124 142 10.5 -0.8108BOBJ1 40 152 Span 4 Interior Girder 1 25 Before Str I-DL Combination -12.757 -2.772 -2 -2.3373 -2.1281 191.0029 152 10.5 -0.8108BOBJ1 41 152 Span 4 Interior Girder 1 25 After Str I-DL Combination -12.839 2.495 2.303 2.7571 -1.6166 191.081 152 10.5 -0.8108BOBJ1 42 162 Span 4 Interior Girder 1 35 Before Str I-DL Combination -11.079 17.837 4.993 5.1602 -13.0569 88.1989 162 10.5 -0.8108BOBJ1 43 162 Span 4 Interior Girder 1 35 After Str I-DL Combination -9.582 18.81 5.338 5.6697 5.3557 87.1241 162 10.5 -0.8108BOBJ1 44 172 Span 4 Interior Girder 1 45 Before Str I-DL Combination -5.869 34.217 2.946 4.3048 -3.0445 -180.646 172 10.5 -0.8108BOBJ1 45 172 Span 4 Interior Girder 1 45 After Str I-DL Combination -4.795 35.059 1.105 2.9892 6.3193 -181.421 172 10.5 -0.8108BOBJ1 46 177 Span 4 Interior Girder 1 50 Before Str I-DL Combination -4.653 43.155 0.086 2.2076 6.2231 -375.945 177 10.5 -0.9268BOBJ1 47 177 Span 5 Interior Girder 1 0 After Str I-DL Combination -4.493 -42.913 -0.147 -2.2428 6.0682 -370.277 177 10.5 -0.9268BOBJ1 48 182 Span 5 Interior Girder 1 5 Before Str I-DL Combination -4.677 -34.818 -1.146 -2.9992 6.2765 -176.909 182 10.5 -0.8108BOBJ1 49 182 Span 5 Interior Girder 1 5 After Str I-DL Combination -5.771 -33.982 -2.941 -4.2921 -3.1263 -176.125 182 10.5 -0.8108BOBJ1 50 192 Span 5 Interior Girder 1 15 Before Str I-DL Combination -9.435 -18.573 -5.286 -5.6307 5.1945 89.2687 192 10.5 -0.8108BOBJ1 51 192 Span 5 Interior Girder 1 15 After Str I-DL Combination -10.951 -17.601 -4.914 -5.105 -13.0075 90.3466 192 10.5 -0.8108BOBJ1 52 202 Span 5 Interior Girder 1 25 Before Str I-DL Combination -12.739 -2.259 -2.193 -2.6727 -1.8256 190.9053 202 10.5 -0.8108

Page 62 ends

BOBJ1 53 202 Span 5 Interior Girder 1 25 After Str I-DL Combination -12.695 3.007 2.114 2.4247 -1.9388 190.8941 202 10.5 -0.8108 BOBJ1 54 212 Span 5 Interior Girder 1 35 Before Str I-DL Combination -10.699 18.355 4.765 4.8409 -12.7275 82.6964 212 10.5 -0.8108BOBJ1 55 212 Span 5 Interior Girder 1 35 After Str I-DL Combination -9.106 19.333 5.056 5.3428 4.8459 81.5531 212 10.5 -0.8108BOBJ1 56 222 Span 5 Interior Girder 1 45 Before Str I-DL Combination -5.299 34.757 2.457 3.9082 -2.1873 -191.596 222 10.5 -0.8108BOBJ1 57 222 Span 5 Interior Girder 1 45 After Str I-DL Combination -4.243 35.605 0.507 2.5529 5.6669 -192.358 222 10.5 -0.8108BOBJ1 58 227 Span 5 Interior Girder 1 50 Before Str I-DL Combination -4.128 43.704 -0.58 1.6661 7.4104 -389.664 227 10.5 -0.9268BOBJ1 59 227 Span 6 Interior Girder 1 0 After Str I-DL Combination -3.63 -44.46 -0.339 -2.4846 6.1476 -391.325 227 10.5 -0.9268BOBJ1 60 232 Span 6 Interior Girder 1 5 Before Str I-DL Combination -3.726 -36.363 -1.4 -3.2602 6.9493 -190.19 232 10.5 -0.8108BOBJ1 61 232 Span 6 Interior Girder 1 5 After Str I-DL Combination -4.774 -35.522 -3.318 -4.6346 -3.4224 -189.439 232 10.5 -0.8108BOBJ1 62 242 Span 6 Interior Girder 1 15 Before Str I-DL Combination -8.495 -20.101 -5.872 -6.111 6.3374 91.3343 242 10.5 -0.8108BOBJ1 63 242 Span 6 Interior Girder 1 15 After Str I-DL Combination -10.063 -19.124 -5.537 -5.6132 -13.9308 92.4501 242 10.5 -0.8108BOBJ1 64 252 Span 6 Interior Girder 1 25 Before Str I-DL Combination -12.002 -3.775 -2.798 -3.1868 -0.7818 208.3119 252 10.5 -0.8108BOBJ1 65 252 Span 6 Interior Girder 1 25 After Str I-DL Combination -12.034 1.568 1.19 1.6674 -3.4128 208.3667 252 10.5 -0.8108BOBJ1 66 262 Span 6 Interior Girder 1 35 Before Str I-DL Combination -10.155 16.899 4.042 4.1722 -11.4267 114.7208 262 10.5 -0.8108BOBJ1 67 262 Span 6 Interior Girder 1 35 After Str I-DL Combination -8.566 17.803 4.56 4.8264 4.0607 113.5801 262 10.5 -0.8108BOBJ1 68 272 Span 6 Interior Girder 1 45 Before Str I-DL Combination -4.445 33.155 2.794 3.8941 -3.1518 -144.133 272 10.5 -0.8108BOBJ1 69 272 Span 6 Interior Girder 1 45 After Str I-DL Combination -3.11 33.974 1.258 2.785 5.9775 -145.096 272 10.5 -0.8108BOBJ1 70 277 Span 6 Interior Girder 1 50 Before Str I-DL Combination -2.702 42.061 0.4 2.1612 5.0381 -334.59 277 10.5 -0.9268BOBJ1 71 277 Span 7 Interior Girder 1 0 After Str I-DL Combination -2.309 -37.468 -0.451 -1.9679 4.6532 -307.814 277 10.5 -0.9268BOBJ1 72 282 Span 7 Interior Girder 1 5 Before Str I-DL Combination -2.331 -29.364 -1.213 -2.4962 5.6095 -141.559 282 10.5 -0.8108BOBJ1 73 282 Span 7 Interior Girder 1 5 After Str I-DL Combination -3.13 -28.442 -2.697 -3.5687 -4.1191 -140.982 282 10.5 -0.8108BOBJ1 74 289.9063 Span 7 Interior Girder 1 12.9063 Before Str I-DL Combination -4.522 -16.652 -4.001 -4.3049 6.0201 38.2708 289.9063 10.5 -0.8108BOBJ1 75 289.9063 Span 7 Interior Girder 1 12.9063 After Str I-DL Combination -5.763 -15.516 -3.84 -4.0152 -11.0784 39.1569 289.9063 10.5 -0.8108BOBJ1 76 297.8125 Span 7 Interior Girder 1 20.8125 Before Str I-DL Combination -6.689 -3.755 -2.697 -2.9536 1.0087 115.9983 297.8125 10.5 -0.8108BOBJ1 77 297.8125 Span 7 Interior Girder 1 20.8125 After Str I-DL Combination -6.654 1.312 0.327 1.0523 -3.5952 115.9915 297.8125 10.5 -0.8108BOBJ1 78 305.7188 Span 7 Interior Girder 1 28.7188 Before Str I-DL Combination -5.637 13.061 1.581 2.194 -6.4948 58.4465 305.7188 10.5 -0.8108BOBJ1 79 305.7188 Span 7 Interior Girder 1 28.7188 After Str I-DL Combination -4.22 14.171 2.018 2.6723 2.1625 57.4346 305.7188 10.5 -0.8108BOBJ1 80 313.625 Span 7 Interior Girder 1 36.625 Before Str I-DL Combination -2.543 25.928 1.157 2.2337 -1.2966 -102.28 313.625 10.5 -0.8108BOBJ1 81 313.625 Span 7 Interior Girder 1 36.625 After Str I-DL Combination -1.435 26.829 0.035 1.4238 4.1478 -103.077 313.625 10.5 -0.8108BOBJ1 82 318.625 Span 7 Interior Girder 1 41.625 Before Str I-DL Combination -1.206 34.919 -0.555 0.892 5.8268 -256.897 318.625 10.5 -0.9268BOBJ1 83 318.625 Span 8 Interior Girder 1 0 After Str I-DL Combination 1.333 -36.68 -2.713 -3.5008 1.2282 -255.396 318.625 10.5 -0.9268BOBJ1 84 323.625 Span 8 Interior Girder 1 5 Before Str I-DL Combination 0.795 -28.606 -3.126 -3.6016 8.3632 -92.2123 323.625 10.5 -0.8108BOBJ1 85 323.625 Span 8 Interior Girder 1 5 After Str I-DL Combination -0.397 -27.881 -3.897 -4.257 -3.4729 -91.3584 323.625 10.5 -0.8108BOBJ1 86 332.0833 Span 8 Interior Girder 1 13.4583 Before Str I-DL Combination -3.549 -14.887 -4.598 -4.5491 4.0179 91.7914 332.0833 10.5 -0.8108BOBJ1 87 332.0833 Span 8 Interior Girder 1 13.4583 After Str I-DL Combination -4.757 -14.057 -4.013 -3.9001 -9.4041 92.6533 332.0833 10.5 -0.8108BOBJ1 88 340.5417 Span 8 Interior Girder 1 21.9167 Before Str I-DL Combination -5.556 -1.008 -1.856 -1.6554 -2.0814 156.9319 340.5417 10.5 -0.8108BOBJ1 89 340.5417 Span 8 Interior Girder 1 21.9167 After Str I-DL Combination -5.059 -0.187 -0.568 -0.4042 -5.2519 156.5722 340.5417 10.5 -0.8108BOBJ1 90 349 Span 8 Interior Girder 1 30.375 Before Str I-DL Combination -2.559 12.757 1.266 1.3997 -4.2529 101.5853 349 10.5 -0.8108BOBJ1 91 349 Span 8 Interior Girder 1 30.375 After Str I-DL Combination -0.994 13.448 1.74 1.7495 1.5541 100.4601 349 10.5 -0.8108BOBJ1 92 354 Span 8 Interior Girder 1 35.375 Before Str I-DL Combination 0.296 20.813 2.263 2.1201 -1.899 13.8777 354 10.5 -0.8108BOBJ1 1 0 Span 1 Interior Girder 2 0 After Str I-DL Combination -1.238 -21.085 2.683 1.292 4.6177 0.565 2.96E-16 3.50E+00 -0.9158BOBJ1 2 5 Span 1 Interior Girder 2 5 Before Str I-DL Combination -2.471 -13.675 2.009 1.0424 -3.9765 88.3458 5.00E+00 3.50E+00 -0.9158BOBJ1 3 5 Span 1 Interior Girder 2 5 After Str I-DL Combination -3.425 -12.964 1.927 1.2393 0.2753 89.0291 5 3.5 -0.9158BOBJ1 4 13.4583 Span 1 Interior Girder 2 13.4583 Before Str I-DL Combination -4.593 -0.055 2.259 2.0847 -5.8584 144.9185 13.4583 3.5 -0.9158BOBJ1 5 13.4583 Span 1 Interior Girder 2 13.4583 After Str I-DL Combination -4.701 0.706 2.541 2.4469 1.0532 144.9961 13.4583 3.5 -0.9158BOBJ1 6 21.9167 Span 1 Interior Girder 2 21.9167 Before Str I-DL Combination -4.017 13.628 2.717 2.8322 -5.3886 83.8909 21.9167 3.5 -0.9158BOBJ1 7 21.9167 Span 1 Interior Girder 2 21.9167 After Str I-DL Combination -3.383 14.398 2.696 2.7971 3.1278 83.437 21.9167 3.5 -0.9158BOBJ1 8 30.375 Span 1 Interior Girder 2 30.375 Before Str I-DL Combination -2.072 27.342 2.159 2.3511 -1.3555 -94.0247 30.375 3.5 -0.9158BOBJ1 9 30.375 Span 1 Interior Girder 2 30.375 After Str I-DL Combination -1.505 28.081 2.029 2.1321 5.2801 -94.4305 30.375 3.5 -0.9158

Page 63 ends

BOBJ1 10 35.375 Span 1 Interior Girder 2 35.375 Before Str I-DL Combination -1.137 36.211 1.912 2.3011 0.5332 -254.711 35.375 3.5 -1.0318 BOBJ1 11 35.375 Span 2 Interior Girder 2 0 After Str I-DL Combination -0.115 -33.734 1.242 0.5532 4.4609 -235.199 35.375 3.5 -1.0318BOBJ1 12 40.375 Span 2 Interior Girder 2 5 Before Str I-DL Combination -0.514 -25.606 0.978 0.3098 0.6426 -87.1594 40.375 3.5 -0.9158BOBJ1 13 40.375 Span 2 Interior Girder 2 5 After Str I-DL Combination -1.289 -24.703 0.723 0.0897 1.6474 -86.6046 40.375 3.5 -0.9158BOBJ1 14 48.2813 Span 2 Interior Girder 2 12.9063 Before Str I-DL Combination -2.362 -12.939 0.362 -0.0846 -1.8969 62.9661 48.2813 3.5 -0.9158BOBJ1 15 48.2813 Span 2 Interior Girder 2 12.9063 After Str I-DL Combination -3.416 -11.81 0.449 -0.0138 -1.3994 63.7208 48.2813 3.5 -0.9158BOBJ1 16 56.1875 Span 2 Interior Girder 2 20.8125 Before Str I-DL Combination -3.995 -0.022 0.765 0.3607 -4.5035 110.9055 56.1875 3.5 -0.9158BOBJ1 17 56.1875 Span 2 Interior Girder 2 20.8125 After Str I-DL Combination -3.812 3.547 1.616 1.4197 0.2387 110.7454 56.1875 3.5 -0.9158BOBJ1 18 64.0938 Span 2 Interior Girder 2 28.7188 Before Str I-DL Combination -2.891 15.318 1.882 1.7902 -5.884 35.5114 64.0938 3.5 -0.9158BOBJ1 19 64.0938 Span 2 Interior Girder 2 28.7188 After Str I-DL Combination -1.62 16.41 1.894 1.8758 2.6965 34.6013 64.0938 3.5 -0.9158BOBJ1 20 72 Span 2 Interior Girder 2 36.625 Before Str I-DL Combination -0.604 28.117 1.461 1.7489 -2.5569 -142.147 72 3.5 -0.9158BOBJ1 21 72 Span 2 Interior Girder 2 36.625 After Str I-DL Combination -0.267 28.964 1.121 1.5647 3.2365 -142.389 72 3.5 -0.9158BOBJ1 22 77 Span 2 Interior Girder 2 41.625 Before Str I-DL Combination -0.326 37.062 0.69 1.5064 2.1212 -306.791 77 3.5 -1.0318BOBJ1 23 77 Span 3 Interior Girder 2 0 After Str I-DL Combination 0.498 -41.385 0.934 0.6331 4.2452 -323.477 77 3.5 -1.0318BOBJ1 24 82 Span 3 Interior Girder 2 5 Before Str I-DL Combination -0.31 -33.229 0.585 0.2858 1.56 -136.887 82 3.5 -0.9158BOBJ1 25 82 Span 3 Interior Girder 2 5 After Str I-DL Combination -1.457 -32.376 0.15 -0.1998 1.242 -136.067 82 3.5 -0.9158BOBJ1 26 92 Span 3 Interior Girder 2 15 Before Str I-DL Combination -4.444 -16.967 -0.888 -1.0533 -0.8025 112.7775 92 3.5 -0.9158BOBJ1 27 92 Span 3 Interior Girder 2 15 After Str I-DL Combination -6.048 -15.993 -0.837 -1.0353 -4.8576 113.9253 92 3.5 -0.9158BOBJ1 28 102 Span 3 Interior Girder 2 25 Before Str I-DL Combination -8.171 -0.579 0.296 0.0139 -5.4742 198.2959 102 3.5 -0.9158BOBJ1 29 102 Span 3 Interior Girder 2 25 After Str I-DL Combination -8.074 3.115 1.301 1.525 -2.788 198.2301 102 3.5 -0.9158BOBJ1 30 112 Span 3 Interior Girder 2 35 Before Str I-DL Combination -5.612 18.522 2.35 2.4768 -7.093 88.2781 112 3.5 -0.9158BOBJ1 31 112 Span 3 Interior Girder 2 35 After Str I-DL Combination -3.908 19.485 2.318 2.4163 1.9738 87.0591 112 3.5 -0.9158BOBJ1 32 122 Span 3 Interior Girder 2 45 Before Str I-DL Combination -1.118 34.86 1.08 1.3928 -0.2199 -186.675 122 3.5 -0.9158BOBJ1 33 122 Span 3 Interior Girder 2 45 After Str I-DL Combination -0.328 35.693 0.58 0.8568 3.6622 -187.24 122 3.5 -0.9158BOBJ1 34 127 Span 3 Interior Girder 2 50 Before Str I-DL Combination 0.091 43.835 0.191 0.6195 3.4532 -385.789 127 3.5 -1.0318BOBJ1 35 127 Span 4 Interior Girder 2 0 After Str I-DL Combination 0.374 -42.475 0.779 -0.2402 4.693 -373.006 127 3.5 -1.0318BOBJ1 36 132 Span 4 Interior Girder 2 5 Before Str I-DL Combination 0.098 -34.37 0.253 -0.5521 1.8843 -181.236 132 3.5 -0.9158BOBJ1 37 132 Span 4 Interior Girder 2 5 After Str I-DL Combination -0.565 -33.595 -0.254 -0.8906 0.1435 -180.76 132 3.5 -0.9158BOBJ1 38 142 Span 4 Interior Girder 2 15 Before Str I-DL Combination -3.559 -18.329 -1.273 -1.4228 -0.2288 81.0296 142 3.5 -0.9158BOBJ1 39 142 Span 4 Interior Girder 2 15 After Str I-DL Combination -5.393 -17.399 -1.267 -1.3536 -5.5424 82.3422 142 3.5 -0.9158BOBJ1 40 152 Span 4 Interior Girder 2 25 Before Str I-DL Combination -7.988 -2.016 -0.395 -0.4219 -4.1435 181.2922 152 3.5 -0.9158BOBJ1 41 152 Span 4 Interior Girder 2 25 After Str I-DL Combination -8.037 1.642 0.982 1.1914 -3.1796 181.3538 152 3.5 -0.9158BOBJ1 42 162 Span 4 Interior Girder 2 35 Before Str I-DL Combination -5.676 17.052 1.833 2.014 -6.417 86.1862 162 3.5 -0.9158BOBJ1 43 162 Span 4 Interior Girder 2 35 After Str I-DL Combination -3.977 18.012 1.806 1.9741 0.8162 84.9706 162 3.5 -0.9158BOBJ1 44 172 Span 4 Interior Girder 2 45 Before Str I-DL Combination -1.148 33.368 0.666 1.094 -0.0997 -173.97 172 3.5 -0.9158BOBJ1 45 172 Span 4 Interior Girder 2 45 After Str I-DL Combination -0.355 34.187 0.175 0.6135 2.6388 -174.538 172 3.5 -0.9158BOBJ1 46 177 Span 4 Interior Girder 2 50 Before Str I-DL Combination 0.068 42.321 -0.258 0.3233 3.7225 -365.534 177 3.5 -1.0318BOBJ1 47 177 Span 5 Interior Girder 2 0 After Str I-DL Combination 0.271 -41.967 0.259 -0.6012 3.7046 -359.27 177 3.5 -1.0318BOBJ1 48 182 Span 5 Interior Girder 2 5 Before Str I-DL Combination -0.065 -33.852 -0.222 -0.8587 2.4102 -170.034 182 3.5 -0.9158BOBJ1 49 182 Span 5 Interior Girder 2 5 After Str I-DL Combination -0.785 -33.065 -0.697 -1.2321 -0.5493 -169.517 182 3.5 -0.9158BOBJ1 50 192 Span 5 Interior Girder 2 15 Before Str I-DL Combination -3.718 -17.773 -1.704 -1.8622 0.4863 86.792 192 3.5 -0.9158BOBJ1 51 192 Span 5 Interior Girder 2 15 After Str I-DL Combination -5.477 -16.834 -1.693 -1.8281 -6.2669 88.0503 192 3.5 -0.9158BOBJ1 52 202 Span 5 Interior Girder 2 25 Before Str I-DL Combination -7.9 -1.443 -0.818 -0.9413 -3.4666 181.1841 202 3.5 -0.9158BOBJ1 53 202 Span 5 Interior Girder 2 25 After Str I-DL Combination -7.861 2.215 0.563 0.6736 -3.8721 181.173 202 3.5 -0.9158BOBJ1 54 212 Span 5 Interior Girder 2 35 Before Str I-DL Combination -5.325 17.617 1.406 1.538 -5.7191 80.1877 212 3.5 -0.9158BOBJ1 55 212 Span 5 Interior Girder 2 35 After Str I-DL Combination -3.549 18.568 1.374 1.5332 0.0684 78.9169 212 3.5 -0.9158BOBJ1 56 222 Span 5 Interior Girder 2 45 Before Str I-DL Combination -0.661 33.896 0.219 0.7529 0.565 -185.491 222 3.5 -0.9158BOBJ1 57 222 Span 5 Interior Girder 2 45 After Str I-DL Combination 0.068 34.701 -0.306 0.3074 2.0734 -186.013 222 3.5 -0.9158BOBJ1 58 227 Span 5 Interior Girder 2 50 Before Str I-DL Combination 0.425 42.826 -0.788 -0.04 4.7052 -379.555 227 3.5 -1.0318

Page 64 ends

BOBJ1 59 227 Span 6 Interior Girder 2 0 After Str I-DL Combination 0.55 -43.531 -0.182 -0.8872 3.4274 -380.114 227 3.5 -1.0318 BOBJ1 60 232 Span 6 Interior Girder 2 5 Before Str I-DL Combination 0.216 -35.407 -0.621 -1.0953 3.4091 -183.048 232 3.5 -0.9158BOBJ1 61 232 Span 6 Interior Girder 2 5 After Str I-DL Combination -0.504 -34.606 -1.109 -1.5288 -0.6797 -182.532 232 3.5 -0.9158BOBJ1 62 242 Span 6 Interior Girder 2 15 Before Str I-DL Combination -3.399 -19.293 -2.22 -2.3111 1.6232 89.0479 242 3.5 -0.9158BOBJ1 63 242 Span 6 Interior Girder 2 15 After Str I-DL Combination -5.165 -18.351 -2.215 -2.2988 -6.9858 90.3115 242 3.5 -0.9158BOBJ1 64 252 Span 6 Interior Girder 2 25 Before Str I-DL Combination -7.699 -2.964 -1.134 -1.2761 -3.1321 198.7036 252 3.5 -0.9158BOBJ1 65 252 Span 6 Interior Girder 2 25 After Str I-DL Combination -7.812 0.735 -0.134 0.2483 -5.2658 198.8254 252 3.5 -0.9158BOBJ1 66 262 Span 6 Interior Girder 2 35 Before Str I-DL Combination -5.761 16.17 0.979 1.2379 -5.077 112.8489 262 3.5 -0.9158BOBJ1 67 262 Span 6 Interior Girder 2 35 After Str I-DL Combination -4.222 17.111 0.995 1.1563 -0.531 111.7484 262 3.5 -0.9158BOBJ1 68 272 Span 6 Interior Girder 2 45 Before Str I-DL Combination -1.343 32.581 -0.184 0.0408 1.6334 -138.753 272 3.5 -0.9158BOBJ1 69 272 Span 6 Interior Girder 2 45 After Str I-DL Combination -0.112 33.468 -0.636 -0.5576 1.7047 -139.633 272 3.5 -0.9158BOBJ1 70 277 Span 6 Interior Girder 2 50 Before Str I-DL Combination 0.797 41.645 -0.935 -0.9411 4.167 -327.577 277 3.5 -1.0318BOBJ1 71 277 Span 7 Interior Girder 2 0 After Str I-DL Combination 0.423 -36.365 -0.664 -1.7666 2.0372 -297.256 277 3.5 -1.0318BOBJ1 72 282 Span 7 Interior Girder 2 5 Before Str I-DL Combination 0.579 -28.289 -1.15 -1.7958 2.8666 -136.268 282 3.5 -0.9158BOBJ1 73 282 Span 7 Interior Girder 2 5 After Str I-DL Combination 0.317 -27.477 -1.465 -1.851 -3.0602 -136.079 282 3.5 -0.9158BOBJ1 74 289.9063 Span 7 Interior Girder 2 12.9063 Before Str I-DL Combination -0.757 -15.81 -1.812 -1.8125 2.2325 35.8102 289.9063 3.5 -0.9158BOBJ1 75 289.9063 Span 7 Interior Girder 2 12.9063 After Str I-DL Combination -2.114 -14.747 -1.754 -1.6303 -5.77 36.7825 289.9063 3.5 -0.9158BOBJ1 76 297.8125 Span 7 Interior Girder 2 20.8125 Before Str I-DL Combination -3.089 -2.99 -1.516 -1.2508 0.0459 107.5946 297.8125 3.5 -0.9158BOBJ1 77 297.8125 Span 7 Interior Girder 2 20.8125 After Str I-DL Combination -3.273 0.537 -0.554 -0.1465 -4.0383 107.7984 297.8125 3.5 -0.9158BOBJ1 78 305.7188 Span 7 Interior Girder 2 28.7188 Before Str I-DL Combination -2.673 12.333 -0.325 0.1581 -1.5848 56.4912 305.7188 3.5 -0.9158BOBJ1 79 305.7188 Span 7 Interior Girder 2 28.7188 After Str I-DL Combination -1.587 13.473 -0.309 0.1605 -1.686 55.7138 305.7188 3.5 -0.9158BOBJ1 80 313.625 Span 7 Interior Girder 2 36.625 Before Str I-DL Combination -0.5 25.249 -0.726 -0.0837 1.7834 -98.1395 313.625 3.5 -0.9158BOBJ1 81 313.625 Span 7 Interior Girder 2 36.625 After Str I-DL Combination 0.287 26.161 -1.018 -0.3594 0.534 -98.7019 313.625 3.5 -0.9158BOBJ1 82 318.625 Span 7 Interior Girder 2 41.625 Before Str I-DL Combination 0.697 34.294 -1.371 -0.683 4.6084 -249.63 318.625 3.5 -1.0318BOBJ1 83 318.625 Span 8 Interior Girder 2 0 After Str I-DL Combination 0.735 -36.336 -1.582 -1.8138 0.4473 -248.56 318.625 3.5 -1.0318BOBJ1 84 323.625 Span 8 Interior Girder 2 5 Before Str I-DL Combination 0.504 -28.216 -1.821 -1.7091 4.2005 -87.5107 323.625 3.5 -0.9158BOBJ1 85 323.625 Span 8 Interior Girder 2 5 After Str I-DL Combination 0.062 -27.485 -1.913 -1.8427 -1.8326 -87.1944 323.625 3.5 -0.9158BOBJ1 86 332.0833 Span 8 Interior Girder 2 13.4583 Before Str I-DL Combination -1.205 -14.54 -2.203 -2.0786 1.9534 91.4451 332.0833 3.5 -0.9158BOBJ1 87 332.0833 Span 8 Interior Girder 2 13.4583 After Str I-DL Combination -1.866 -13.756 -2.125 -2.0832 -4.9036 91.9186 332.0833 3.5 -0.9158BOBJ1 88 340.5417 Span 8 Interior Girder 2 21.9167 Before Str I-DL Combination -2.73 -0.777 -1.82 -1.8211 -0.0908 154.0046 340.5417 3.5 -0.9158BOBJ1 89 340.5417 Span 8 Interior Girder 2 21.9167 After Str I-DL Combination -2.799 0.027 -1.501 -1.6098 -4.7764 154.0536 340.5417 3.5 -0.9158BOBJ1 90 349 Span 8 Interior Girder 2 30.375 Before Str I-DL Combination -2.16 13.044 -1.052 -1.1738 -0.7084 98.3198 349 3.5 -0.9158BOBJ1 91 349 Span 8 Interior Girder 2 30.375 After Str I-DL Combination -1.498 13.812 -0.927 -1.0699 -2.763 97.8463 349 3.5 -0.9158BOBJ1 92 354 Span 8 Interior Girder 2 35.375 Before Str I-DL Combination -0.604 21.27 -1.333 -1.2695 1.7093 9.5069 354 3.5 -0.9158BOBJ1 1 0 Span 1 Interior Girder 3 0 After Str I-DL Combination -9.727 -22.625 2.414 2.1323 1.6102 -12.8857 -2.96E-16 -3.50E+00 -1.0208BOBJ1 2 5 Span 1 Interior Girder 3 5 Before Str I-DL Combination -9.581 -15.074 2.533 2.3485 -3.7181 81.2591 5 -3.5 -1.0208BOBJ1 3 5 Span 1 Interior Girder 3 5 After Str I-DL Combination -9.231 -14.173 2.379 2.2334 2.6644 81.0082 5 -3.5 -1.0208BOBJ1 4 13.4583 Span 1 Interior Girder 3 13.4583 Before Str I-DL Combination -7.795 -0.873 1.543 1.5767 -3.4099 143.5885 13.4583 -3.5 -1.0208BOBJ1 5 13.4583 Span 1 Interior Girder 3 13.4583 After Str I-DL Combination -6.821 0.045 1.224 1.2549 0.4805 142.8915 13.4583 -3.5 -1.0208BOBJ1 6 21.9167 Span 1 Interior Girder 3 21.9167 Before Str I-DL Combination -4.455 13.188 0.597 0.7683 -1.8458 85.1968 21.9167 -3.5 -1.0208BOBJ1 7 21.9167 Span 1 Interior Girder 3 21.9167 After Str I-DL Combination -3.187 14.021 0.522 0.6586 -0.0037 84.2893 21.9167 -3.5 -1.0208BOBJ1 8 30.375 Span 1 Interior Girder 3 30.375 Before Str I-DL Combination -0.953 27.024 0.431 0.6546 -0.3056 -90.9181 30.375 -3.5 -1.0208BOBJ1 9 30.375 Span 1 Interior Girder 3 30.375 After Str I-DL Combination -0.1 27.766 0.469 0.672 1.3425 -91.529 30.375 -3.5 -1.0208BOBJ1 10 35.375 Span 1 Interior Girder 3 35.375 Before Str I-DL Combination 0.491 35.893 0.339 0.7926 1.0782 -250.575 35.375 -3.5 -1.1368BOBJ1 11 35.375 Span 2 Interior Girder 3 0 After Str I-DL Combination 2.124 -33.864 2.344 1.848 4.3948 -236.791 35.375 -3.5 -1.1368BOBJ1 12 40.375 Span 2 Interior Girder 3 5 Before Str I-DL Combination 1.841 -25.735 2.137 1.6651 -2.6831 -87.9273 40.375 -3.5 -1.0208BOBJ1 13 40.375 Span 2 Interior Girder 3 5 After Str I-DL Combination 1.167 -24.834 2.165 1.7868 3.4144 -87.4451 40.375 -3.5 -1.0208BOBJ1 14 48.2813 Span 2 Interior Girder 3 12.9063 Before Str I-DL Combination 0.21 -13.075 2.089 1.9182 -5.5261 63.1023 48.2813 -3.5 -1.0208BOBJ1 15 48.2813 Span 2 Interior Girder 3 12.9063 After Str I-DL Combination -0.795 -11.953 1.894 1.791 2.2045 63.822 48.2813 -3.5 -1.0208

Page 65 ends

BOBJ1 16 56.1875 Span 2 Interior Girder 3 20.8125 Before Str I-DL Combination -1.475 -0.168 1.015 1.2588 -3.1767 112.2233 56.1875 -3.5 -1.0208 BOBJ1 17 56.1875 Span 2 Interior Girder 3 20.8125 After Str I-DL Combination -1.367 3.8 0.827 0.3545 0.5548 112.2661 56.1875 -3.5 -1.0208BOBJ1 18 64.0938 Span 2 Interior Girder 3 28.7188 Before Str I-DL Combination -0.53 15.619 0.004602 -0.1594 -1.1968 34.9011 64.0938 -3.5 -1.0208BOBJ1 19 64.0938 Span 2 Interior Girder 3 28.7188 After Str I-DL Combination 0.587 16.812 -0.076 -0.2369 -0.9938 34.1023 64.0938 -3.5 -1.0208BOBJ1 20 72 Span 2 Interior Girder 3 36.625 Before Str I-DL Combination 1.67 28.676 0.003629 -0.0413 -0.064 -146.49 72 -3.5 -1.0208BOBJ1 21 72 Span 2 Interior Girder 3 36.625 After Str I-DL Combination 2.673 29.678 0.219 0.1619 1.0408 -147.206 72 -3.5 -1.0208BOBJ1 22 77 Span 2 Interior Girder 3 41.625 Before Str I-DL Combination 3.349 37.87 0.242 0.4348 1.0986 -316.369 77 -3.5 -1.1368BOBJ1 23 77 Span 3 Interior Girder 3 0 After Str I-DL Combination 3.487 -40.747 2.148 1.7704 3.8431 -317.12 77 -3.5 -1.1368BOBJ1 24 82 Span 3 Interior Girder 3 5 Before Str I-DL Combination 3.439 -32.68 2.093 1.7717 -2.6907 -133.699 82 -3.5 -1.0208BOBJ1 25 82 Span 3 Interior Girder 3 5 After Str I-DL Combination 2.965 -31.965 2.29 2.054 2.7034 -133.357 82 -3.5 -1.0208BOBJ1 26 92 Span 3 Interior Girder 3 15 Before Str I-DL Combination -0.107 -16.79 2.596 2.5985 -6.7492 112.6733 92 -3.5 -1.0208BOBJ1 27 92 Span 3 Interior Girder 3 15 After Str I-DL Combination -1.998 -15.885 2.495 2.5275 1.451 114.0269 92 -3.5 -1.0208BOBJ1 28 102 Span 3 Interior Girder 3 25 Before Str I-DL Combination -4.466 -0.513 0.814 1.3614 -3.7674 197.8241 102 -3.5 -1.0208BOBJ1 29 102 Span 3 Interior Girder 3 25 After Str I-DL Combination -4.32 2.968 0.259 -0.0983 -1.9291 197.7637 102 -3.5 -1.0208BOBJ1 30 112 Span 3 Interior Girder 3 35 Before Str I-DL Combination -1.335 18.359 -1.36 -1.2965 -0.0166 88.9718 112 -3.5 -1.0208BOBJ1 31 112 Span 3 Interior Girder 3 35 After Str I-DL Combination 0.73 19.282 -1.386 -1.365 -4.1619 87.4935 112 -3.5 -1.0208BOBJ1 32 122 Span 3 Interior Girder 3 45 Before Str I-DL Combination 3.995 34.515 -0.851 -0.7749 1.1481 -183.867 122 -3.5 -1.0208BOBJ1 33 122 Span 3 Interior Girder 3 45 After Str I-DL Combination 4.626 35.267 -0.552 -0.4813 0.0277 -184.32 122 -3.5 -1.0208BOBJ1 34 127 Span 3 Interior Girder 3 50 Before Str I-DL Combination 4.823 43.358 -0.526 -0.2642 2.303 -380.998 127 -3.5 -1.1368BOBJ1 35 127 Span 4 Interior Girder 3 0 After Str I-DL Combination 4.775 -43.067 1.427 1.1158 3.3479 -380.546 127 -3.5 -1.1368BOBJ1 36 132 Span 4 Interior Girder 3 5 Before Str I-DL Combination 4.302 -34.905 1.408 1.2217 -1.3341 -185.303 132 -3.5 -1.0208BOBJ1 37 132 Span 4 Interior Girder 3 5 After Str I-DL Combination 3.473 -34.044 1.68 1.5391 2.1666 -184.711 132 -3.5 -1.0208BOBJ1 38 142 Span 4 Interior Girder 3 15 Before Str I-DL Combination 0.761 -18.607 2.209 2.2027 -5.7924 80.488 142 -3.5 -1.0208BOBJ1 39 142 Span 4 Interior Girder 3 15 After Str I-DL Combination -0.907 -17.621 2.191 2.1724 1.1733 81.6815 142 -3.5 -1.0208BOBJ1 40 152 Span 4 Interior Girder 3 25 Before Str I-DL Combination -3.339 -2.176 0.58 1.0284 -3.3603 182.4037 152 -3.5 -1.0208BOBJ1 41 152 Span 4 Interior Girder 3 25 After Str I-DL Combination -3.269 1.66 -0.033 -0.4775 -2.4694 182.2653 152 -3.5 -1.0208BOBJ1 42 162 Span 4 Interior Girder 3 35 Before Str I-DL Combination -0.494 17.051 -1.668 -1.6619 0.2673 86.7024 162 -3.5 -1.0208BOBJ1 43 162 Span 4 Interior Girder 3 35 After Str I-DL Combination 1.375 17.982 -1.711 -1.7251 -5.008 85.3647 162 -3.5 -1.0208BOBJ1 44 172 Span 4 Interior Girder 3 45 Before Str I-DL Combination 4.349 33.251 -1.241 -1.1406 1.3676 -172.954 172 -3.5 -1.0208BOBJ1 45 172 Span 4 Interior Girder 3 45 After Str I-DL Combination 4.99 34.026 -0.981 -0.8555 -0.9393 -173.414 172 -3.5 -1.0208BOBJ1 46 177 Span 4 Interior Girder 3 50 Before Str I-DL Combination 5.234 42.133 -0.986 -0.7041 2.5293 -364.012 177 -3.5 -1.1368BOBJ1 47 177 Span 5 Interior Girder 3 0 After Str I-DL Combination 5.174 -42.306 1.057 0.7505 2.6121 -363.736 177 -3.5 -1.1368BOBJ1 48 182 Span 5 Interior Girder 3 5 Before Str I-DL Combination 4.711 -34.16 1.048 0.8967 -1.0476 -172.222 182 -3.5 -1.0208BOBJ1 49 182 Span 5 Interior Girder 3 5 After Str I-DL Combination 3.881 -33.324 1.302 1.1853 1.4371 -171.629 182 -3.5 -1.0208BOBJ1 50 192 Span 5 Interior Girder 3 15 Before Str I-DL Combination 1.05 -17.936 1.757 1.7614 -5.1202 86.7094 192 -3.5 -1.0208BOBJ1 51 192 Span 5 Interior Girder 3 15 After Str I-DL Combination -0.666 -16.966 1.712 1.6967 0.3101 87.9377 192 -3.5 -1.0208BOBJ1 52 202 Span 5 Interior Girder 3 25 Before Str I-DL Combination -3.148 -1.537 0.075 0.5123 -2.5552 182.2378 202 -3.5 -1.0208BOBJ1 53 202 Span 5 Interior Girder 3 25 After Str I-DL Combination -3.09 2.302 -0.539 -0.994 -3.3006 182.165 202 -3.5 -1.0208BOBJ1 54 212 Span 5 Interior Girder 3 35 Before Str I-DL Combination -0.366 17.71 -2.147 -2.1375 1.1037 80.1443 212 -3.5 -1.0208BOBJ1 55 212 Span 5 Interior Girder 3 35 After Str I-DL Combination 1.45 18.658 -2.161 -2.1657 -5.7035 78.8445 212 -3.5 -1.0208BOBJ1 56 222 Span 5 Interior Girder 3 45 Before Str I-DL Combination 4.295 33.978 -1.615 -1.4921 2.065 -186.387 222 -3.5 -1.0208BOBJ1 57 222 Span 5 Interior Girder 3 45 After Str I-DL Combination 4.935 34.78 -1.337 -1.1785 -1.2462 -186.846 222 -3.5 -1.0208BOBJ1 58 227 Span 5 Interior Girder 3 50 Before Str I-DL Combination 5.189 42.905 -1.353 -1.0682 3.2387 -381.26 227 -3.5 -1.1368BOBJ1 59 227 Span 6 Interior Girder 3 0 After Str I-DL Combination 5.119 -43.566 0.6 0.3131 2.3652 -381.172 227 -3.5 -1.1368BOBJ1 60 232 Span 6 Interior Girder 3 5 Before Str I-DL Combination 4.708 -35.437 0.621 0.5241 -0.1088 -183.361 232 -3.5 -1.0208BOBJ1 61 232 Span 6 Interior Girder 3 5 After Str I-DL Combination 3.894 -34.626 0.915 0.8212 1.1939 -182.778 232 -3.5 -1.0208BOBJ1 62 242 Span 6 Interior Girder 3 15 Before Str I-DL Combination 0.761 -19.277 1.438 1.4048 -4.3142 89.0008 242 -3.5 -1.0208BOBJ1 63 242 Span 6 Interior Girder 3 15 After Str I-DL Combination -1.162 -18.314 1.411 1.3353 0.0069 90.3767 242 -3.5 -1.0208BOBJ1 64 252 Span 6 Interior Girder 3 25 Before Str I-DL Combination -3.866 -2.886 -0.212 0.1342 -2.0548 198.3211 252 -3.5 -1.0208

Page 66 ends

BOBJ1 65 252 Span 6 Interior Girder 3 25 After Str I-DL Combination -3.886 0.587 -0.766 -1.3378 -3.7285 198.1677 252 -3.5 -1.0208 BOBJ1 66 262 Span 6 Interior Girder 3 35 Before Str I-DL Combination -1.116 15.92 -2.446 -2.5093 1.3239 113.594 262 -3.5 -1.0208BOBJ1 67 262 Span 6 Interior Girder 3 35 After Str I-DL Combination 0.934 16.729 -2.546 -2.5569 -6.7132 112.1259 262 -3.5 -1.0208BOBJ1 68 272 Span 6 Interior Girder 3 45 Before Str I-DL Combination 4.154 31.77 -2.23 -2.0082 2.5489 -132.739 272 -3.5 -1.0208BOBJ1 69 272 Span 6 Interior Girder 3 45 After Str I-DL Combination 4.425 32.421 -2.034 -1.7337 -2.6843 -132.937 272 -3.5 -1.0208BOBJ1 70 277 Span 6 Interior Girder 3 50 Before Str I-DL Combination 4.241 40.447 -2.091 -1.7328 3.687 -314.879 277 -3.5 -1.1368BOBJ1 71 277 Span 7 Interior Girder 3 0 After Str I-DL Combination 3.988 -37.774 -0.177 -0.3891 1.0862 -313.551 277 -3.5 -1.1368BOBJ1 72 282 Span 7 Interior Girder 3 5 Before Str I-DL Combination 3.095 -29.541 -0.161 -0.1235 0.8659 -144.741 282 -3.5 -1.0208BOBJ1 73 282 Span 7 Interior Girder 3 5 After Str I-DL Combination 1.931 -28.469 0.041 0.0793 -0.0764 -143.911 282 -3.5 -1.0208BOBJ1 74 289.9063 Span 7 Interior Girder 3 12.9063 Before Str I-DL Combination 0.959 -16.531 0.104 0.2663 -1.137 34.6704 289.9063 -3.5 -1.0208BOBJ1 75 289.9063 Span 7 Interior Girder 3 12.9063 After Str I-DL Combination 0.062 -15.285 0.014 0.1772 -1.228 35.3117 289.9063 -3.5 -1.0208BOBJ1 76 297.8125 Span 7 Interior Girder 3 20.8125 Before Str I-DL Combination -0.577 -3.439 -0.812 -0.3445 0.4805 109.7828 297.8125 -3.5 -1.0208BOBJ1 77 297.8125 Span 7 Interior Girder 3 20.8125 After Str I-DL Combination -0.513 0.685 -1.014 -1.2512 -3.1891 109.5234 297.8125 -3.5 -1.0208BOBJ1 78 305.7188 Span 7 Interior Girder 3 28.7188 Before Str I-DL Combination 0.321 12.46 -1.883 -1.7699 2.2065 56.9635 305.7188 -3.5 -1.0208BOBJ1 79 305.7188 Span 7 Interior Girder 3 28.7188 After Str I-DL Combination 1.371 13.564 -2.057 -1.8738 -5.3994 56.2112 305.7188 -3.5 -1.0208BOBJ1 80 313.625 Span 7 Interior Girder 3 36.625 Before Str I-DL Combination 2.265 25.3 -2.094 -1.7061 3.4335 -98.0646 313.625 -3.5 -1.0208BOBJ1 81 313.625 Span 7 Interior Girder 3 36.625 After Str I-DL Combination 2.732 26.181 -1.949 -1.4892 -2.224 -98.399 313.625 -3.5 -1.0208BOBJ1 82 318.625 Span 7 Interior Girder 3 41.625 Before Str I-DL Combination 2.87 34.299 -1.907 -1.4208 3.608 -249.447 318.625 -3.5 -1.1368BOBJ1 83 318.625 Span 8 Interior Girder 3 0 After Str I-DL Combination 2.653 -36.457 -0.588 -1.1376 0.7402 -249.263 318.625 -3.5 -1.1368BOBJ1 84 323.625 Span 8 Interior Girder 3 5 Before Str I-DL Combination 2.095 -28.311 -0.518 -0.8146 1.5338 -87.217 323.625 -3.5 -1.0208BOBJ1 85 323.625 Span 8 Interior Girder 3 5 After Str I-DL Combination 1.34 -27.55 -0.436 -0.7403 -0.3036 -86.6767 323.625 -3.5 -1.0208BOBJ1 86 332.0833 Span 8 Interior Girder 3 13.4583 Before Str I-DL Combination -0.183 -14.555 -0.55 -0.7314 -0.0791 92.4792 332.0833 -3.5 -1.0208BOBJ1 87 332.0833 Span 8 Interior Girder 3 13.4583 After Str I-DL Combination -0.916 -13.757 -0.628 -0.836 -2.0353 93.0043 332.0833 -3.5 -1.0208BOBJ1 88 340.5417 Span 8 Interior Girder 3 21.9167 Before Str I-DL Combination -1.908 -0.763 -1.25 -1.3061 0.3117 155.1289 340.5417 -3.5 -1.0208BOBJ1 89 340.5417 Span 8 Interior Girder 3 21.9167 After Str I-DL Combination -2.042 0.041 -1.567 -1.62 -3.6685 155.2245 340.5417 -3.5 -1.0208BOBJ1 90 349 Span 8 Interior Girder 3 30.375 Before Str I-DL Combination -1.534 13.056 -2.427 -2.2869 2.541 99.4823 349 -3.5 -1.0208BOBJ1 91 349 Span 8 Interior Girder 3 30.375 After Str I-DL Combination -0.951 13.818 -2.602 -2.4159 -3.8711 99.0643 349 -3.5 -1.0208BOBJ1 92 354 Span 8 Interior Girder 3 35.375 Before Str I-DL Combination -0.278 21.263 -2.391 -2.0674 1.9215 10.873 354 -3.5 -1.0208BOBJ1 1 0 Span 1 Interior Girder 4 0 After Str I-DL Combination 0.267 -20.849 4.482 5.8506 3.9039 7.1895 -8.88E-16 -1.05E+01 -1.1258BOBJ1 2 5 Span 1 Interior Girder 4 5 Before Str I-DL Combination -1.079 -13.509 3.853 5.413 -5.6813 94.0473 5.00E+00 -1.05E+01 -1.1258BOBJ1 3 5 Span 1 Interior Girder 4 5 After Str I-DL Combination -2.626 -12.864 3.38 4.794 4.9176 95.1595 5 -10.5 -1.1258BOBJ1 4 13.4583 Span 1 Interior Girder 4 13.4583 Before Str I-DL Combination -5.052 0.012 1.206 2.1662 -0.9006 151.3003 13.4583 -10.5 -1.1258BOBJ1 5 13.4583 Span 1 Interior Girder 4 13.4583 After Str I-DL Combination -5.401 0.808 -0.096 0.5626 0.7914 151.5504 13.4583 -10.5 -1.1258BOBJ1 6 21.9167 Span 1 Interior Girder 4 21.9167 Before Str I-DL Combination -4.019 13.851 -2.511 -2.2666 4.2932 88.577 21.9167 -10.5 -1.1258BOBJ1 7 21.9167 Span 1 Interior Girder 4 21.9167 After Str I-DL Combination -2.42 14.679 -3.043 -3.0965 -3.9205 87.4318 21.9167 -10.5 -1.1258BOBJ1 8 30.375 Span 1 Interior Girder 4 30.375 Before Str I-DL Combination 1.584 27.683 -2.465 -3.0119 2.0063 -94.6206 30.375 -10.5 -1.1258BOBJ1 9 30.375 Span 1 Interior Girder 4 30.375 After Str I-DL Combination 3.054 28.403 -1.639 -2.3967 -4.5585 -95.6781 30.375 -10.5 -1.1258BOBJ1 10 35.375 Span 1 Interior Girder 4 35.375 Before Str I-DL Combination 3.792 36.467 -1.537 -2.0949 0.4963 -258.247 35.375 -10.5 -1.2418BOBJ1 11 35.375 Span 2 Interior Girder 4 0 After Str I-DL Combination 4.752 -34.686 2.717 3.0737 2.2619 -247.725 35.375 -10.5 -1.2418BOBJ1 12 40.375 Span 2 Interior Girder 4 5 Before Str I-DL Combination 4.636 -26.609 2.834 3.2628 -6.0322 -94.4251 40.375 -10.5 -1.1258BOBJ1 13 40.375 Span 2 Interior Girder 4 5 After Str I-DL Combination 3.633 -25.718 3.762 4.03 5.9998 -93.7036 40.375 -10.5 -1.1258BOBJ1 14 48.2813 Span 2 Interior Girder 4 12.9063 Before Str I-DL Combination 2.098 -13.958 4.19 4.4346 -8.8125 64.2387 48.2813 -10.5 -1.1258BOBJ1 15 48.2813 Span 2 Interior Girder 4 12.9063 After Str I-DL Combination 0.841 -12.844 3.667 3.9442 6.8285 65.1368 48.2813 -10.5 -1.1258BOBJ1 16 56.1875 Span 2 Interior Girder 4 20.8125 Before Str I-DL Combination -0.018 -1.079 2.095 2.8117 -4.4542 120.7871 56.1875 -10.5 -1.1258BOBJ1 17 56.1875 Span 2 Interior Girder 4 20.8125 After Str I-DL Combination 0.373 4.352 -1.165 -1.5285 -2.4552 120.4926 56.1875 -10.5 -1.1258BOBJ1 18 64.0938 Span 2 Interior Girder 4 28.7188 Before Str I-DL Combination 2.009 16.115 -2.591 -2.6748 5.3007 38.4158 64.0938 -10.5 -1.1258BOBJ1 19 64.0938 Span 2 Interior Girder 4 28.7188 After Str I-DL Combination 3.925 17.223 -2.794 -3.1526 -5.0894 37.0466 64.0938 -10.5 -1.1258BOBJ1 20 72 Span 2 Interior Girder 4 36.625 Before Str I-DL Combination 5.825 28.968 -1.87 -2.7102 3.5302 -146.91 72 -10.5 -1.1258BOBJ1 21 72 Span 2 Interior Girder 4 36.625 After Str I-DL Combination 6.631 29.833 -0.421 -1.8646 -1.7681 -147.493 72 -10.5 -1.1258

Page 67 ends

BOBJ1 22 77 Span 2 Interior Girder 4 41.625 Before Str I-DL Combination 6.472 37.899 0.037 -1.2917 -1.4864 -316.888 77 -10.5 -1.2418 BOBJ1 23 77 Span 3 Interior Girder 4 0 After Str I-DL Combination 8.232 -42.571 3.026 3.5521 2.872 -341.012 77 -10.5 -1.2418BOBJ1 24 82 Span 3 Interior Girder 4 5 Before Str I-DL Combination 7.774 -34.457 3.201 3.886 -6.8893 -147.73 82 -10.5 -1.1258BOBJ1 25 82 Span 3 Interior Girder 4 5 After Str I-DL Combination 6.389 -33.595 4.621 5.1622 5.1007 -146.733 82 -10.5 -1.1258BOBJ1 26 92 Span 3 Interior Girder 4 15 Before Str I-DL Combination 2.584 -18.117 6.234 6.5004 -11.5405 114.5229 92 -10.5 -1.1258BOBJ1 27 92 Span 3 Interior Girder 4 15 After Str I-DL Combination 1.209 -17.132 5.656 5.9145 8.0944 115.505 92 -10.5 -1.1258BOBJ1 28 102 Span 3 Interior Girder 4 25 Before Str I-DL Combination -0.41 -1.752 2.215 3.1872 -5.6691 211.0374 102 -10.5 -1.1258BOBJ1 29 102 Span 3 Interior Girder 4 25 After Str I-DL Combination -0.206 4.05 -1.891 -2.2683 -5.05 210.897 102 -10.5 -1.1258BOBJ1 30 112 Span 3 Interior Girder 4 35 Before Str I-DL Combination 2.206 19.441 -5.161 -5.019 7.8518 91.7618 112 -10.5 -1.1258BOBJ1 31 112 Span 3 Interior Girder 4 35 After Str I-DL Combination 3.934 20.436 -5.522 -5.5709 -9.5698 90.5275 112 -10.5 -1.1258BOBJ1 32 122 Span 3 Interior Girder 4 45 Before Str I-DL Combination 8.031 35.941 -3.131 -4.0222 3.6268 -194.274 122 -10.5 -1.1258BOBJ1 33 122 Span 3 Interior Girder 4 45 After Str I-DL Combination 9.17 36.809 -1.23 -2.5886 -3.7914 -195.096 122 -10.5 -1.1258BOBJ1 34 127 Span 3 Interior Girder 4 50 Before Str I-DL Combination 9.286 44.919 -0.695 -1.8237 -0.4913 -400.007 127 -10.5 -1.2418BOBJ1 35 127 Span 4 Interior Girder 4 0 After Str I-DL Combination 10.223 -43.683 1.498 3.1171 0.3503 -390.034 127 -10.5 -1.2418BOBJ1 36 132 Span 4 Interior Girder 4 5 Before Str I-DL Combination 10.311 -35.611 2.036 3.7012 -4.6862 -191.246 132 -10.5 -1.1258BOBJ1 37 132 Span 4 Interior Girder 4 5 After Str I-DL Combination 9.389 -34.803 3.826 4.9381 5.0362 -190.578 132 -10.5 -1.1258BOBJ1 38 142 Span 4 Interior Girder 4 15 Before Str I-DL Combination 5.36 -19.414 5.965 6.1348 -10.3455 83.3923 142 -10.5 -1.1258BOBJ1 39 142 Span 4 Interior Girder 4 15 After Str I-DL Combination 3.649 -18.454 5.581 5.5322 8.4368 84.6147 142 -10.5 -1.1258BOBJ1 40 152 Span 4 Interior Girder 4 25 Before Str I-DL Combination 1.412 -3.09 2.494 2.9071 -6.2716 193.9048 152 -10.5 -1.1258BOBJ1 41 152 Span 4 Interior Girder 4 25 After Str I-DL Combination 1.419 2.648 -2.103 -2.6774 -5.653 193.9263 152 -10.5 -1.1258BOBJ1 42 162 Span 4 Interior Girder 4 35 Before Str I-DL Combination 3.622 18.036 -5.193 -5.2484 7.6277 88.9656 162 -10.5 -1.1258BOBJ1 43 162 Span 4 Interior Girder 4 35 After Str I-DL Combination 5.276 19.022 -5.579 -5.7898 -9.977 87.7838 162 -10.5 -1.1258BOBJ1 44 172 Span 4 Interior Girder 4 45 Before Str I-DL Combination 9.258 34.491 -3.42 -4.3653 3.7974 -182.623 172 -10.5 -1.1258BOBJ1 45 172 Span 4 Interior Girder 4 45 After Str I-DL Combination 10.35 35.34 -1.658 -3.0258 -4.6755 -183.412 172 -10.5 -1.1258BOBJ1 46 177 Span 4 Interior Girder 4 50 Before Str I-DL Combination 10.441 43.439 -1.206 -2.3891 -0.1429 -381.063 177 -10.5 -1.2418BOBJ1 47 177 Span 5 Interior Girder 4 0 After Str I-DL Combination 10.706 -43.084 1.386 2.8009 -0.003 -374.859 177 -10.5 -1.2418BOBJ1 48 182 Span 5 Interior Girder 4 5 Before Str I-DL Combination 10.678 -35.005 1.856 3.3713 -4.7542 -178.946 182 -10.5 -1.1258BOBJ1 49 182 Span 5 Interior Girder 4 5 After Str I-DL Combination 9.656 -34.189 3.559 4.5852 4.3062 -178.207 182 -10.5 -1.1258BOBJ1 50 192 Span 5 Interior Girder 4 15 Before Str I-DL Combination 5.593 -18.787 5.551 5.7398 -9.8555 89.58 192 -10.5 -1.1258BOBJ1 51 192 Span 5 Interior Girder 4 15 After Str I-DL Combination 3.891 -17.823 5.125 5.1229 7.5337 90.7962 192 -10.5 -1.1258BOBJ1 52 202 Span 5 Interior Girder 4 25 Before Str I-DL Combination 1.65 -2.455 2.007 2.4865 -5.5121 193.76 202 -10.5 -1.1258BOBJ1 53 202 Span 5 Interior Girder 4 25 After Str I-DL Combination 1.647 3.282 -2.596 -3.1 -6.4501 193.7749 202 -10.5 -1.1258BOBJ1 54 212 Span 5 Interior Girder 4 35 Before Str I-DL Combination 3.851 18.667 -5.649 -5.6563 8.5078 82.4873 212 -10.5 -1.1258BOBJ1 55 212 Span 5 Interior Girder 4 35 After Str I-DL Combination 5.516 19.648 -5.989 -6.1823 -10.4813 81.2973 212 -10.5 -1.1258BOBJ1 56 222 Span 5 Interior Girder 4 45 Before Str I-DL Combination 9.465 35.103 -3.673 -4.7133 4.4877 -195.281 222 -10.5 -1.1258BOBJ1 57 222 Span 5 Interior Girder 4 45 After Str I-DL Combination 10.449 35.943 -1.82 -3.3502 -4.607 -195.992 222 -10.5 -1.1258BOBJ1 58 227 Span 5 Interior Girder 4 50 Before Str I-DL Combination 10.416 44.035 -1.298 -2.6975 0.1503 -396.554 227 -10.5 -1.2418BOBJ1 59 227 Span 6 Interior Girder 4 0 After Str I-DL Combination 10.003 -44.616 0.866 2.2243 -0.3904 -394.43 227 -10.5 -1.2418BOBJ1 60 232 Span 6 Interior Girder 4 5 Before Str I-DL Combination 9.954 -36.526 1.419 2.926 -3.8916 -190.949 232 -10.5 -1.1258BOBJ1 61 232 Span 6 Interior Girder 4 5 After Str I-DL Combination 8.886 -35.69 3.269 4.2409 4.0972 -190.178 232 -10.5 -1.1258BOBJ1 62 242 Span 6 Interior Girder 4 15 Before Str I-DL Combination 4.708 -20.25 5.509 5.5332 -9.5031 92.5005 242 -10.5 -1.1258BOBJ1 63 242 Span 6 Interior Girder 4 15 After Str I-DL Combination 2.932 -19.277 5.111 4.9082 7.7603 93.7697 242 -10.5 -1.1258BOBJ1 64 252 Span 6 Interior Girder 4 25 Before Str I-DL Combination 0.474 -3.906 1.812 2.0895 -4.9676 211.4041 252 -10.5 -1.1258BOBJ1 65 252 Span 6 Interior Girder 4 25 After Str I-DL Combination 0.266 1.906 -2.303 -3.3731 -5.8556 211.5903 252 -10.5 -1.1258BOBJ1 66 262 Span 6 Interior Girder 4 35 Before Str I-DL Combination 1.834 17.308 -5.72 -6.0354 8.1267 114.4497 262 -10.5 -1.1258BOBJ1 67 262 Span 6 Interior Girder 4 35 After Str I-DL Combination 3.154 18.262 -6.255 -6.5694 -11.7169 113.5069 262 -10.5 -1.1258BOBJ1 68 272 Span 6 Interior Girder 4 45 Before Str I-DL Combination 6.879 33.804 -4.482 -4.9535 4.4717 -149.452 272 -10.5 -1.1258BOBJ1 69 272 Span 6 Interior Girder 4 45 After Str I-DL Combination 8.347 34.701 -3.014 -3.5494 -6.9396 -150.507 272 -10.5 -1.1258BOBJ1 70 277 Span 6 Interior Girder 4 50 Before Str I-DL Combination 8.879 42.836 -2.873 -3.1584 2.6809 -345.19 277 -10.5 -1.2418

Page 68 ends

BOBJ1 71 277 Span 7 Interior Girder 4 0 After Str I-DL Combination 7.683 -37.198 0.107 1.6753 -1.4881 -307.437 277 -10.5 -1.2418 BOBJ1 72 282 Span 7 Interior Girder 4 5 Before Str I-DL Combination 7.915 -29.154 0.577 2.1766 -1.8524 -141.406 282 -10.5 -1.1258BOBJ1 73 282 Span 7 Interior Girder 4 5 After Str I-DL Combination 7.187 -28.327 1.943 2.8687 3.9001 -140.877 282 -10.5 -1.1258BOBJ1 74 289.9063 Span 7 Interior Girder 4 12.9063 Before Str I-DL Combination 5.244 -16.625 2.746 3.1306 -4.9063 38.2143 289.9063 -10.5 -1.1258BOBJ1 75 289.9063 Span 7 Interior Girder 4 12.9063 After Str I-DL Combination 3.25 -15.548 2.489 2.5478 5.0896 39.6387 289.9063 -10.5 -1.1258BOBJ1 76 297.8125 Span 7 Interior Girder 4 20.8125 Before Str I-DL Combination 1.565 -3.8 1.086 1.383 -2.3876 117.3262 297.8125 -10.5 -1.1258BOBJ1 77 297.8125 Span 7 Interior Girder 4 20.8125 After Str I-DL Combination 1.176 1.582 -2.303 -3.0156 -4.938 117.656 297.8125 -10.5 -1.1258BOBJ1 78 305.7188 Span 7 Interior Girder 4 28.7188 Before Str I-DL Combination 2.063 13.356 -3.775 -4.0659 7.0175 57.9725 305.7188 -10.5 -1.1258BOBJ1 79 305.7188 Span 7 Interior Girder 4 28.7188 After Str I-DL Combination 3.362 14.486 -4.172 -4.4512 -8.8042 57.0447 305.7188 -10.5 -1.1258BOBJ1 80 313.625 Span 7 Interior Girder 4 36.625 Before Str I-DL Combination 4.941 26.265 -3.568 -3.9057 5.5257 -105.178 313.625 -10.5 -1.1258BOBJ1 81 313.625 Span 7 Interior Girder 4 36.625 After Str I-DL Combination 6.002 27.173 -2.544 -3.0489 -5.5418 -105.941 313.625 -10.5 -1.1258BOBJ1 82 318.625 Span 7 Interior Girder 4 41.625 Before Str I-DL Combination 6.123 35.261 -2.499 -2.8695 2.321 -262.251 318.625 -10.5 -1.2418BOBJ1 83 318.625 Span 8 Interior Girder 4 0 After Str I-DL Combination 6.059 -36.554 1.432 1.6696 0.8147 -251.738 318.625 -10.5 -1.2418BOBJ1 84 323.625 Span 8 Interior Girder 4 5 Before Str I-DL Combination 5.315 -28.493 1.444 1.8785 -3.792 -88.4599 323.625 -10.5 -1.1258BOBJ1 85 323.625 Span 8 Interior Girder 4 5 After Str I-DL Combination 3.888 -27.777 2.162 2.374 2.0902 -87.4329 323.625 -10.5 -1.1258BOBJ1 86 332.0833 Span 8 Interior Girder 4 13.4583 Before Str I-DL Combination -0.111 -14.774 2.487 2.2602 -2.9237 95.4164 332.0833 -10.5 -1.1258BOBJ1 87 332.0833 Span 8 Interior Girder 4 13.4583 After Str I-DL Combination -1.754 -13.935 1.855 1.4049 3.4479 96.5926 332.0833 -10.5 -1.1258BOBJ1 88 340.5417 Span 8 Interior Girder 4 21.9167 Before Str I-DL Combination -3.333 -0.846 -0.687 -1.2735 1.6931 160.2299 340.5417 -10.5 -1.1258BOBJ1 89 340.5417 Span 8 Interior Girder 4 21.9167 After Str I-DL Combination -3.16 -0.014 -2.014 -2.6927 -2.4298 160.1058 340.5417 -10.5 -1.1258BOBJ1 90 349 Span 8 Interior Girder 4 30.375 Before Str I-DL Combination -1.276 12.952 -4.207 -4.7852 5.1675 103.9878 349 -10.5 -1.1258BOBJ1 91 349 Span 8 Interior Girder 4 30.375 After Str I-DL Combination -0.053 13.644 -4.829 -5.2357 -7.6159 103.1081 349 -10.5 -1.1258BOBJ1 92 354 Span 8 Interior Girder 4 35.375 Before Str I-DL Combination 0.91 21.02 -5.877 -5.7355 6.6894 15.7656 354 -10.5 -1.1258BOBJ1 1 0 Span 1 Right Exterior Girder 0 After Str I-DL Combination -0.149 -25.904 3.991 11.7416 -3.3862 -6.8593 -1.18E-15 -1.75E+01 -1.2308BOBJ1 2 5 Span 1 Right Exterior Girder 5 Before Str I-DL Combination 2.124 -17.694 5.314 12.2822 -19.1373 100.5072 5 -17.5 -1.2308BOBJ1 3 5 Span 1 Right Exterior Girder 5 After Str I-DL Combination 4.406 -15.859 4.853 9.8344 -11.6397 98.8682 5 -17.5 -1.2308BOBJ1 4 13.4583 Span 1 Right Exterior Girder 13.4583 Before Str I-DL Combination 7.618 -1.161 1.514 4.6561 -28.4326 168.5143 13.4583 -17.5 -1.2308BOBJ1 5 13.4583 Span 1 Right Exterior Girder 13.4583 After Str I-DL Combination 8.034 0.686 -0.484 0.6703 -26.9696 168.2162 13.4583 -17.5 -1.2308BOBJ1 6 21.9167 Span 1 Right Exterior Girder 21.9167 Before Str I-DL Combination 6.218 15.31 -4.49 -5.0886 -11.5437 101.8759 21.9167 -17.5 -1.2308BOBJ1 7 21.9167 Span 1 Right Exterior Girder 21.9167 After Str I-DL Combination 4.248 17.173 -5.96 -8.588 -17.9238 103.2868 21.9167 -17.5 -1.2308BOBJ1 8 30.375 Span 1 Right Exterior Girder 30.375 Before Str I-DL Combination -0.347 31.915 -6.309 -11.265 21.2409 -100.989 30.375 -17.5 -1.2308BOBJ1 9 30.375 Span 1 Right Exterior Girder 30.375 After Str I-DL Combination -2.008 33.656 -3.407 -11.1243 16.3161 -99.7945 30.375 -17.5 -1.2308BOBJ1 10 35.375 Span 1 Right Exterior Girder 35.3766 Before Str I-DL Combination -2.787 42.357 2.642 -11.9116 16.1523 -288.646 35.375 -17.375 -1.3449BOBJ1 11 35.375 Span 2 Right Exterior Girder 0 After Str I-DL Combination -1.308 -39.27 -2.153 10.3065 17.2229 -269.361 35.375 -17.375 -1.3449BOBJ1 12 40.375 Span 2 Right Exterior Girder 5.0016 Before Str I-DL Combination -0.458 -30.776 3.448 9.582 16.4076 -95.3063 40.375 -17.5 -1.2308BOBJ1 13 40.375 Span 2 Right Exterior Girder 5.0016 After Str I-DL Combination 1.752 -28.443 6.073 8.9532 23.3207 -96.893 40.375 -17.5 -1.2308BOBJ1 14 48.2813 Span 2 Right Exterior Girder 12.9078 Before Str I-DL Combination 4.89 -15.514 5.959 7.7026 -13.9772 74.6318 48.2813 -17.5 -1.2308BOBJ1 15 48.2813 Span 2 Right Exterior Girder 12.9078 After Str I-DL Combination 7.753 -12.827 4.488 3.2856 -4.4523 72.5847 48.2813 -17.5 -1.2308BOBJ1 16 56.1875 Span 2 Right Exterior Girder 20.8141 Before Str I-DL Combination 9.826 0.071 2.594 0.662 -25.399 121.5283 56.1875 -17.5 -1.2308BOBJ1 17 56.1875 Span 2 Right Exterior Girder 20.8141 After Str I-DL Combination 9.913 2.88 -3.088 -0.7767 -24.9668 121.3663 56.1875 -17.5 -1.2308BOBJ1 18 64.0938 Span 2 Right Exterior Girder 28.7203 Before Str I-DL Combination 8.079 15.76 -4.892 -3.4013 0.4846 48.9921 64.0938 -17.5 -1.2308BOBJ1 19 64.0938 Span 2 Right Exterior Girder 28.7203 After Str I-DL Combination 5.633 18.414 -6.124 -7.7472 -7.4438 50.7402 64.0938 -17.5 -1.2308BOBJ1 20 72 Span 2 Right Exterior Girder 36.6266 Before Str I-DL Combination 3.283 31.299 -5.594 -8.6709 31.5098 -144.102 72 -17.5 -1.2308BOBJ1 21 72 Span 2 Right Exterior Girder 36.6266 After Str I-DL Combination 2.134 33.396 -1.846 -8.4624 28.4088 -143.273 72 -17.5 -1.2308BOBJ1 22 77 Span 2 Right Exterior Girder 41.6281 Before Str I-DL Combination 2.13 42.068 5.111 -8.0544 20.4566 -331.876 77 -17.375 -1.3449BOBJ1 23 77 Span 3 Right Exterior Girder 0 After Str I-DL Combination -1.153 -47.622 -3.896 11.5196 23.153 -365.875 77 -17.375 -1.3449BOBJ1 24 82 Span 3 Right Exterior Girder 5.0016 Before Str I-DL Combination -0.088 -39.13 3.915 11.8929 26.385 -150.192 82 -17.5 -1.2308BOBJ1 25 82 Span 3 Right Exterior Girder 5.0016 After Str I-DL Combination 2.304 -37.011 8.033 12.6748 33.708 -151.911 82 -17.5 -1.2308BOBJ1 26 92 Span 3 Right Exterior Girder 15.0016 Before Str I-DL Combination 9.811 -19.556 7.873 9.7398 -24.4513 125.5354 92 -17.5 -1.2308BOBJ1 27 92 Span 3 Right Exterior Girder 15.0016 After Str I-DL Combination 13.303 -17.313 6.239 5.7157 -12.8277 123.0379 92 -17.5 -1.2308

Page 69 ends

BOBJ1 28 102 Span 3 Right Exterior Girder 25.0016 Before Str I-DL Combination 17.884 0.095 2.806 0.04 -42.3238 205.8646 102 -17.5 -1.2308 BOBJ1 29 102 Span 3 Right Exterior Girder 25.0016 After Str I-DL Combination 17.869 2.027 -3.266 0.0572 -42.2877 205.7518 102 -17.5 -1.2308BOBJ1 30 112 Span 3 Right Exterior Girder 35.0016 Before Str I-DL Combination 13.334 19.405 -6.616 -5.6601 -8.2388 101.8093 112 -17.5 -1.2308BOBJ1 31 112 Span 3 Right Exterior Girder 35.0016 After Str I-DL Combination 9.98 21.622 -8.133 -9.6798 -19.2901 104.2075 112 -17.5 -1.2308BOBJ1 32 122 Span 3 Right Exterior Girder 45.0016 Before Str I-DL Combination 3.381 39.004 -7.475 -12.2424 41.2479 -194.188 122 -17.5 -1.2308BOBJ1 33 122 Span 3 Right Exterior Girder 45.0016 After Str I-DL Combination 1.766 40.888 -2.513 -10.847 36.7252 -193.025 122 -17.5 -1.2308BOBJ1 34 127 Span 3 Right Exterior Girder 50.0031 Before Str I-DL Combination 1.494 49.57 6.485 -9.6501 26.0705 -418.844 127 -17.375 -1.3449BOBJ1 35 127 Span 4 Right Exterior Girder 0 After Str I-DL Combination 1.745 -48.711 -6.018 10.0905 26.2936 -412.384 127 -17.375 -1.3449BOBJ1 36 132 Span 4 Right Exterior Girder 5.0016 Before Str I-DL Combination 2.239 -40.226 2.751 11.2851 35.941 -190.497 132 -17.5 -1.2308BOBJ1 37 132 Span 4 Right Exterior Girder 5.0016 After Str I-DL Combination 4.075 -38.128 7.57 12.5179 41.2721 -191.819 132 -17.5 -1.2308BOBJ1 38 142 Span 4 Right Exterior Girder 15.0016 Before Str I-DL Combination 11.128 -20.72 8.155 9.9743 -18.1521 97.3604 142 -17.5 -1.2308BOBJ1 39 142 Span 4 Right Exterior Girder 15.0016 After Str I-DL Combination 14.668 -18.495 6.627 5.9735 -6.41 94.8289 142 -17.5 -1.2308BOBJ1 40 152 Span 4 Right Exterior Girder 25.0016 Before Str I-DL Combination 19.569 -1.111 3.34 0.3402 -39.4762 189.3764 152 -17.5 -1.2308BOBJ1 41 152 Span 4 Right Exterior Girder 25.0016 After Str I-DL Combination 19.655 0.687 -3.078 -0.0033 -39.1885 189.3014 152 -17.5 -1.2308BOBJ1 42 162 Span 4 Right Exterior Girder 35.0016 Before Str I-DL Combination 15.124 18.071 -6.342 -5.6128 -7.5704 98.727 162 -17.5 -1.2308BOBJ1 43 162 Span 4 Right Exterior Girder 35.0016 After Str I-DL Combination 11.781 20.296 -7.863 -9.6056 -18.6349 101.1176 162 -17.5 -1.2308BOBJ1 44 172 Span 4 Right Exterior Girder 45.0016 Before Str I-DL Combination 5.087 37.701 -7.398 -12.233 39.5943 -184.065 172 -17.5 -1.2308BOBJ1 45 172 Span 4 Right Exterior Girder 45.0016 After Str I-DL Combination 3.345 39.596 -2.69 -10.9935 34.5789 -182.811 172 -17.5 -1.2308BOBJ1 46 177 Span 4 Right Exterior Girder 50.0031 Before Str I-DL Combination 2.926 48.282 5.931 -9.9689 25.0475 -402.241 177 -17.375 -1.3449BOBJ1 47 177 Span 5 Right Exterior Girder 0 After Str I-DL Combination 3.106 -48.071 -5.657 10.143 25.0116 -397.332 177 -17.375 -1.3449BOBJ1 48 182 Span 5 Right Exterior Girder 5.0016 Before Str I-DL Combination 3.595 -39.586 2.808 11.1459 33.7746 -178.481 182 -17.5 -1.2308BOBJ1 49 182 Span 5 Right Exterior Girder 5.0016 After Str I-DL Combination 5.387 -37.485 7.418 12.2296 38.9691 -179.772 182 -17.5 -1.2308BOBJ1 50 192 Span 5 Right Exterior Girder 15.0016 Before Str I-DL Combination 12.14 -20.072 7.83 9.571 -18.9548 103.1676 192 -17.5 -1.2308BOBJ1 51 192 Span 5 Right Exterior Girder 15.0016 After Str I-DL Combination 15.477 -17.845 6.287 5.5617 -7.9056 100.7816 192 -17.5 -1.2308BOBJ1 52 202 Span 5 Right Exterior Girder 25.0016 Before Str I-DL Combination 19.94 -0.459 2.998 -0.0688 -39.0575 189.136 202 -17.5 -1.2308BOBJ1 53 202 Span 5 Right Exterior Girder 25.0016 After Str I-DL Combination 19.808 1.336 -3.426 -0.4157 -39.4911 189.264 202 -17.5 -1.2308BOBJ1 54 212 Span 5 Right Exterior Girder 35.0016 Before Str I-DL Combination 14.835 18.719 -6.683 -6.0246 -5.9367 92.5174 212 -17.5 -1.2308BOBJ1 55 212 Span 5 Right Exterior Girder 35.0016 After Str I-DL Combination 11.288 20.942 -8.188 -10.008 -17.6945 95.0536 212 -17.5 -1.2308BOBJ1 56 222 Span 5 Right Exterior Girder 45.0016 Before Str I-DL Combination 4.302 38.342 -7.542 -12.5154 42.0259 -196.354 222 -17.5 -1.2308BOBJ1 57 222 Span 5 Right Exterior Girder 45.0016 After Str I-DL Combination 2.526 40.234 -2.615 -11.1204 36.9072 -195.075 222 -17.5 -1.2308BOBJ1 58 227 Span 5 Right Exterior Girder 50.0031 Before Str I-DL Combination 2.11 48.919 6.324 -9.8897 26.333 -417.6 227 -17.375 -1.3449BOBJ1 59 227 Span 6 Right Exterior Girder 0 After Str I-DL Combination 2.197 -49.408 -6.239 9.809 26.0558 -414.533 227 -17.375 -1.3449BOBJ1 60 232 Span 6 Right Exterior Girder 5.0016 Before Str I-DL Combination 2.534 -40.927 2.625 10.9984 36.0772 -188.987 232 -17.5 -1.2308BOBJ1 61 232 Span 6 Right Exterior Girder 5.0016 After Str I-DL Combination 4.194 -38.836 7.503 12.2479 40.7666 -190.184 232 -17.5 -1.2308BOBJ1 62 242 Span 6 Right Exterior Girder 15.0016 Before Str I-DL Combination 10.862 -21.446 8.117 9.6602 -19.5737 106.4494 242 -17.5 -1.2308BOBJ1 63 242 Span 6 Right Exterior Girder 15.0016 After Str I-DL Combination 14.218 -19.228 6.58 5.6246 -8.5095 104.0497 242 -17.5 -1.2308BOBJ1 64 252 Span 6 Right Exterior Girder 25.0016 Before Str I-DL Combination 18.707 -1.848 3.21 -0.1116 -42.2282 206.2463 252 -17.5 -1.2308BOBJ1 65 252 Span 6 Right Exterior Girder 25.0016 After Str I-DL Combination 18.687 0.076 -2.876 -0.0998 -42.3761 206.4033 252 -17.5 -1.2308BOBJ1 66 262 Span 6 Right Exterior Girder 35.0016 Before Str I-DL Combination 14.051 17.482 -6.276 -5.7538 -12.51 121.9128 262 -17.5 -1.2308BOBJ1 67 262 Span 6 Right Exterior Girder 35.0016 After Str I-DL Combination 10.556 19.722 -7.888 -9.7641 -24.1358 124.4119 262 -17.5 -1.2308BOBJ1 68 272 Span 6 Right Exterior Girder 45.0016 Before Str I-DL Combination 3.105 37.17 -8.015 -12.6819 34.2139 -154.7 272 -17.5 -1.2308BOBJ1 69 272 Span 6 Right Exterior Girder 45.0016 After Str I-DL Combination 0.755 39.084 -3.814 -11.7541 27.0417 -153.012 272 -17.5 -1.2308BOBJ1 70 277 Span 6 Right Exterior Girder 50.0031 Before Str I-DL Combination -0.249 47.777 4.134 -11.3707 23.0076 -369.112 277 -17.375 -1.3449BOBJ1 71 277 Span 7 Right Exterior Girder 0 After Str I-DL Combination 3.441 -41.53 -4.83 8.1898 20.1533 -323.979 277 -17.375 -1.3449BOBJ1 72 282 Span 7 Right Exterior Girder 5.0016 Before Str I-DL Combination 3.501 -33.059 1.916 8.5757 27.532 -137.452 282 -17.5 -1.2308BOBJ1 73 282 Span 7 Right Exterior Girder 5.0016 After Str I-DL Combination 4.677 -30.754 5.53 8.6055 30.7442 -138.301 282 -17.5 -1.2308BOBJ1 74 289.9063 Span 7 Right Exterior Girder 12.9078 Before Str I-DL Combination 7.036 -17.863 6.018 7.6603 -7.4863 52.2027 289.9063 -17.5 -1.2308BOBJ1 75 289.9063 Span 7 Right Exterior Girder 12.9078 After Str I-DL Combination 9.464 -15.205 4.77 3.3077 0.4029 50.4669 289.9063 -17.5 -1.2308BOBJ1 76 297.8125 Span 7 Right Exterior Girder 20.8141 Before Str I-DL Combination 11.261 -2.325 2.962 0.6825 -24.1832 118.4824 297.8125 -17.5 -1.2308

Page 70 ends

BOBJ1 77 297.8125 Span 7 Right Exterior Girder 20.8141 After Str I-DL Combination 11.094 0.451 -2.802 -0.8554 -24.853 118.7111 297.8125 -17.5 -1.2308 BOBJ1 78 305.7188 Span 7 Right Exterior Girder 28.7203 Before Str I-DL Combination 8.926 13.346 -4.658 -3.4582 -2.7336 65.7185 305.7188 -17.5 -1.2308BOBJ1 79 305.7188 Span 7 Right Exterior Girder 28.7203 After Str I-DL Combination 6.016 16.028 -6.064 -7.8389 -12.4014 67.799 305.7188 -17.5 -1.2308BOBJ1 80 313.625 Span 7 Right Exterior Girder 36.6266 Before Str I-DL Combination 2.908 28.95 -6.054 -9.0136 25.3593 -107.78 313.625 -17.5 -1.2308BOBJ1 81 313.625 Span 7 Right Exterior Girder 36.6266 After Str I-DL Combination 0.806 31.075 -3.138 -9.3525 18.8347 -106.271 313.625 -17.5 -1.2308BOBJ1 82 318.625 Span 7 Right Exterior Girder 41.6281 Before Str I-DL Combination 0.07 39.767 2.846 -9.8897 17.268 -282.554 318.625 -17.375 -1.3449BOBJ1 83 318.625 Span 8 Right Exterior Girder 0 After Str I-DL Combination -0.585 -42.137 -2.394 11.8535 16.2853 -279.672 318.625 -17.375 -1.3449BOBJ1 84 323.625 Span 8 Right Exterior Girder 5.0016 Before Str I-DL Combination 0.152 -33.642 3.454 11.0043 15.7299 -91.1189 323.625 -17.5 -1.2308BOBJ1 85 323.625 Span 8 Right Exterior Girder 5.0016 After Str I-DL Combination 1.695 -31.7 6.172 10.9156 20.2327 -92.2291 323.625 -17.5 -1.2308BOBJ1 86 332.0833 Span 8 Right Exterior Girder 13.4599 Before Str I-DL Combination 5.897 -16.953 5.698 8.1722 -18.6004 110.4919 332.0833 -17.5 -1.2308BOBJ1 87 332.0833 Span 8 Right Exterior Girder 13.4599 After Str I-DL Combination 7.627 -15.081 4.194 4.6849 -13.0659 109.2533 332.0833 -17.5 -1.2308BOBJ1 88 340.5417 Span 8 Right Exterior Girder 21.9182 Before Str I-DL Combination 8.92 -0.428 0.173 -0.9534 -27.7328 173.9165 340.5417 -17.5 -1.2308BOBJ1 89 340.5417 Span 8 Right Exterior Girder 21.9182 After Str I-DL Combination 8.246 1.44 -1.812 -4.8382 -30.1029 174.3994 340.5417 -17.5 -1.2308BOBJ1 90 349 Span 8 Right Exterior Girder 30.3766 Before Str I-DL Combination 4.579 16.192 -5.122 -9.7804 -12.5005 102.4941 349 -17.5 -1.2308BOBJ1 91 349 Span 8 Right Exterior Girder 30.3766 After Str I-DL Combination 2.148 18.05 -5.566 -12.1261 -20.5125 104.2395 349 -17.5 -1.2308BOBJ1 92 354 Span 8 Right Exterior Girder 35.3766 Before Str I-DL Combination -0.106 26.283 -4.169 -11.4522 -3.6091 -4.979 354 -17.5 -1.2308

Page 71 ends

Max Postive M Max Negative M Max V range
Kip-ft Kip-ft Kip
200.00 -410.95 48.73 4 95208.37 -396.40 44.65 96 187198.83 -385.79 43.84 188 279198.32 -381.26 43.57 280 371211.59 -400.01 44.92 372 463206.40 -418.84 49.57 464 555 All Dead Load, Concrete+UtilityOffset 0.75 ft
Row Row+/-1 Location 1 Location 2 M max M near M target 37 36 127 122 -410.95 -192.92 -378.24
129 128 127 122 -396.40 -194.37 -366.10221 220 127 122 -385.79 -187.24 -356.01337 336 227 222 -381.26 -186.85 -352.10405 404 127 122 -400.01 -195.10 -369.27497 496 127 122 -418.84 -193.03 -384.97 Offset 3 ft
Row Row+/-1 Location 1 Location 2 V max V near V target 37 36 127 122 48.73 39.69 43.31
129 128 127 122 44.65 36.56 39.79221 220 127 122 43.84 35.69 38.95338 339 227 232 -43.57 -35.44 38.69405 404 127 122 44.92 36.81 40.05497 496 127 122 49.57 40.89 44.36 Kip-ft Kip-ft Kip Kip-ft Kip-ft Kip Kip-ft Kip-ft Kip
200.0 -378.2 43.3 211.6 -369.3 40.1 206.4 -385.0 44.4
Reduced at face of pier for moment and 3ft away for shear Find Negative Moment @9" away
Find End Shear @36" away
North Exterior Girder
Interior Girder 1Interior Girder 2Interior Girder 3Interior Girder 1Interior Girder 2 South Exterior Girder
Max
Postive M
Max
Negative
Max
V
Max
Postive M
Max
Negative M
Max
V
Max
Postive M
Max
Negative
Max
V
North Exterior Girder Interior Girder
Interior Girder 4
South Exterior Girder
Span 2-7
Interior Girder 4
South Exterior Girder
Interior Girder 3
North Exterior Girder
Interior Girder 1Interior Girder 2Interior Girder 3Interior Girder 4 South Exterior Girder
North Exterior Girder

Page 72 ends

Max Postive M Max Negative M Max V range1 range2
Kip-ft Kip-ft Kip
165.79 -290.87 42.00 4 13 86 95156.93 -264.34 36.84 96 105 178 187154.05 -254.71 36.34 188 197 270 279155.22 -250.57 36.46 280 289 362 371160.23 -258.25 36.55 372 381 454 463174.40 -288.65 42.36 464 473 546 555 Offset 0.75 ft
Row Row-1 Location 1 Location 2 M max M near M target
13 12 35.375 30.375 -290.87 -106.03 -263.15
105 104 35.375 30.375 -264.34 -100.65 -239.79197 196 35.375 30.375 -254.71 -94.43 -230.67289 288 35.375 30.375 -250.57 -91.53 -226.72381 380 35.375 30.375 -258.25 -95.68 -233.86473 472 35.375 30.375 -288.65 -99.79 -260.32 Offset 3 ft
Row Row+/-1 Location 1 Location 2 V max V near V target 13 12 35.375 30.375 42.00 32.95 36.57
105 104 35.375 30.375 36.84 28.76 31.99270 271 318.625 323.625 -36.34 -28.22 31.46362 363 318.625 323.625 -36.46 -28.31 31.57454 455 318.625 323.625 -36.55 -28.49 31.72473 472 35.375 30.375 42.36 33.66 37.14 Kip-ft Kip Kip-ft Kip Kip-ft Kip
-263.1 36.6 -239.8 32.0 -260.3 37.1
Reduced at face of pier for moment and 3ft away for shear Negative
M
Moment& Shear
at Span 1&8
Find End Shear @36" away
North Exterior Girder
Interior Girder 1Interior Girder 2Interior Girder 3Interior Girder 4 South Exterior Girder
Shear
V Negative M Shear
V Negative M Shear
V
Interior Girder
Find Negative Moment @9" away
North Exterior Girder
Interior Girder 1Interior Girder 2Interior Girder 3Interior Girder 4 South Exterior Girder
South
Exterior Girder
Interior Girder 2Interior Girder 3Interior Girder 4
South Exterior Girder
North
Exterior Girder
Span 1&8
North Exterior Girder
Interior Girder 1

Page 73 ends

TABLE: Bridge Object Girder Forces
BridgeObj BridgeCut Station Span Girder GirderDist LocType OutputCase CaseType P V2 V3 T M2 M3 GlobalX GlobalY GlobalZ Text Unitless ft Text Text ft Text Text Text Kip Kip Kip Kip-ft Kip-ft Kip-ft ft ft ft BOBJ1 1 0 Span 1 Left Exterior Girder 0 After Str I-DL 24 Combination -0.503 -28.518 -2.428 -17.911 5.8424 -9.9225 1.18E-15 1.75E+01 -0.7058BOBJ1 2 5 Span 1 Left Exterior Girder 5 Before Str I-DL 24 Combination 1.859 -18.782 -4.728 -15.1712 15.9898 106.6351 5.00E+00 1.75E+01 -0.7058BOBJ1 3 5 Span 1 Left Exterior Girder 5 After Str I-DL 24 Combination 4.19 -17.77 -4.553 -15.0077 8.4106 104.9649 5 17.5 -0.7058BOBJ1 4 13.4583 Span 1 Left Exterior Girder 13.4583 Before Str I-DL 24 Combination 7.474 -0.927 -1.543 -4.7525 24.187 181.6378 13.4583 17.5 -0.7058BOBJ1 5 13.4583 Span 1 Left Exterior Girder 13.4583 After Str I-DL 24 Combination 7.806 0.02 0.67 -2.86 23.0305 181.4055 13.4583 17.5 -0.7058BOBJ1 6 21.9167 Span 1 Left Exterior Girder 21.9167 Before Str I-DL 24 Combination 5.348 16.778 4.664 8.1278 8.2812 112.1479 21.9167 17.5 -0.7058BOBJ1 7 21.9167 Span 1 Left Exterior Girder 21.9167 After Str I-DL 24 Combination 2.841 17.763 6.312 9.4513 16.4707 113.9498 21.9167 17.5 -0.7058BOBJ1 8 30.375 Span 1 Left Exterior Girder 30.375 Before Str I-DL 24 Combination -3.146 34.72 6.16 16.9047 -19.0699 -103.661 30.375 17.5 -0.7058BOBJ1 9 30.375 Span 1 Left Exterior Girder 30.375 After Str I-DL 24 Combination -5.524 35.661 3.043 14.4841 -11.7144 -101.951 30.375 17.5 -0.7058BOBJ1 10 35.375 Span 1 Left Exterior Girder 35.3766 Before Str I-DL 24 Combination -6.887 45.906 -3.545 19.2984 -6.9429 -303.792 35.375 17.375 -0.8237BOBJ1 11 35.375 Span 2 Left Exterior Girder 0 After Str I-DL 24 Combination -4.998 -42.31 4.635 -15.082 -6.6879 -289.068 35.375 17.375 -0.8237BOBJ1 12 40.375 Span 2 Left Exterior Girder 5.0016 Before Str I-DL 24 Combination -4.507 -32.288 -1.681 -10.6513 -14.7648 -103.808 40.375 17.5 -0.7058BOBJ1 13 40.375 Span 2 Left Exterior Girder 5.0016 After Str I-DL 24 Combination -2.64 -30.945 -4.744 -12.7998 -20.4012 -105.151 40.375 17.5 -0.7058BOBJ1 14 48.2813 Span 2 Left Exterior Girder 12.9078 Before Str I-DL 24 Combination 0.147 -15.576 -5.292 -5.9078 10.3321 76.7592 48.2813 17.5 -0.7058BOBJ1 15 48.2813 Span 2 Left Exterior Girder 12.9078 After Str I-DL 24 Combination 2.738 -14.128 -4.073 -4.6684 1.8444 74.9056 48.2813 17.5 -0.7058BOBJ1 16 56.1875 Span 2 Left Exterior Girder 20.8141 Before Str I-DL 24 Combination 4.54 1.159 -3.237 3.5274 24.7031 124.8858 56.1875 17.5 -0.7058BOBJ1 17 56.1875 Span 2 Left Exterior Girder 20.8141 After Str I-DL 24 Combination 3.929 2.29 4.844 -1.4723 26.7166 125.4629 56.1875 17.5 -0.7058BOBJ1 18 64.0938 Span 2 Left Exterior Girder 28.7203 Before Str I-DL 24 Combination 0.921 17.576 5.614 6.6752 -4.4865 49.0792 64.0938 17.5 -0.7058BOBJ1 19 64.0938 Span 2 Left Exterior Girder 28.7203 After Str I-DL 24 Combination -2.708 19.016 6.65 7.7807 7.5039 51.6755 64.0938 17.5 -0.7058BOBJ1 20 72 Span 2 Left Exterior Girder 36.6266 Before Str I-DL 24 Combination -6.24 34.37 5.563 14.3005 -29.3585 -156.84 72 17.5 -0.7058BOBJ1 21 72 Span 2 Left Exterior Girder 36.6266 After Str I-DL 24 Combination -8.374 35.503 1.503 11.2966 -22.876 -155.305 72 17.5 -0.7058BOBJ1 22 77 Span 2 Left Exterior Girder 41.6281 Before Str I-DL 24 Combination -9.034 45.716 -6.069 14.9025 -10.792 -356.529 77 17.375 -0.8237BOBJ1 23 77 Span 3 Left Exterior Girder 0 After Str I-DL 24 Combination -12.84 -51.06 6.278 -17.4615 -10.0162 -387.678 77 17.375 -0.8237BOBJ1 24 82 Span 3 Left Exterior Girder 5.0016 Before Str I-DL 24 Combination -12.008 -41.029 -2.041 -13.9134 -21.515 -159.846 82 17.5 -0.7058BOBJ1 25 82 Span 3 Left Exterior Girder 5.0016 After Str I-DL 24 Combination -9.826 -39.789 -6.479 -17.2274 -28.0121 -161.411 82 17.5 -0.7058BOBJ1 26 92 Span 3 Left Exterior Girder 15.0016 Before Str I-DL 24 Combination -2.802 -19.711 -7.185 -8.7521 21.2722 130.9962 92 17.5 -0.7058BOBJ1 27 92 Span 3 Left Exterior Girder 15.0016 After Str I-DL 24 Combination 0.479 -18.522 -5.535 -7.2762 10.4811 128.6584 92 17.5 -0.7058BOBJ1 28 102 Span 3 Left Exterior Girder 25.0016 Before Str I-DL 24 Combination 4.678 1.39 -3.81 3.8097 42.1905 211.2956 102 17.5 -0.7058BOBJ1 29 102 Span 3 Left Exterior Girder 25.0016 After Str I-DL 24 Combination 3.932 1.338 5.767 -1.9846 44.6947 211.8563 102 17.5 -0.7058BOBJ1 30 112 Span 3 Left Exterior Girder 35.0016 Before Str I-DL 24 Combination -3.284 21.242 7.458 9.0988 4.0891 104.1086 112 17.5 -0.7058BOBJ1 31 112 Span 3 Left Exterior Girder 35.0016 After Str I-DL 24 Combination -7.943 22.419 9.033 10.5328 19.5975 107.4497 112 17.5 -0.7058BOBJ1 32 122 Span 3 Left Exterior Girder 45.0016 Before Str I-DL 24 Combination -17.333 42.468 7.67 18.575 -37.0907 -210.23 122 17.5 -0.7058BOBJ1 33 122 Span 3 Left Exterior Girder 45.0016 After Str I-DL 24 Combination -20.241 43.486 2.501 14.6722 -28.1364 -208.137 122 17.5 -0.7058BOBJ1 34 127 Span 3 Left Exterior Girder 50.0031 Before Str I-DL 24 Combination -21.407 53.72 -6.967 17.6992 -16.057 -447.527 127 17.375 -0.8237BOBJ1 35 127 Span 4 Left Exterior Girder 0 After Str I-DL 24 Combination -21 -52.658 6.924 -17.4257 -15.7519 -439.325 127 17.375 -0.8237 BOBJ1 36 132 Span 4 Left Exterior Girder 5.0016 Before Str I-DL 24 Combination -19.922 -42.629 -2.28 -14.4321 -27.9601 -204.621 132 17.5 -0.7058 BOBJ1 37 132 Span 4 Left Exterior Girder 5.0016 After Str I-DL 24 Combination -17.17 -41.404 -7.313 -18.1572 -36.4024 -206.594 132 17.5 -0.7058BOBJ1 38 142 Span 4 Left Exterior Girder 15.0016 Before Str I-DL 24 Combination -8.266 -21.366 -8.62 -10.0367 18.1459 100.8315 142 17.5 -0.7058BOBJ1 39 142 Span 4 Left Exterior Girder 15.0016 After Str I-DL 24 Combination -3.804 -20.193 -7.061 -8.6058 3.2752 97.6489 142 17.5 -0.7058BOBJ1 40 152 Span 4 Left Exterior Girder 25.0016 Before Str I-DL 24 Combination 2.962 -0.297 -5.425 2.438 41.8335 195.2439 152 17.5 -0.7058BOBJ1 41 152 Span 4 Left Exterior Girder 25.0016 After Str I-DL 24 Combination 3.456 -0.406 4.361 -3.1024 40.1067 194.9147 152 17.5 -0.7058BOBJ1 42 162 Span 4 Left Exterior Girder 35.0016 Before Str I-DL 24 Combination -1.391 19.496 5.989 7.9203 5.6977 102.9296 162 17.5 -0.7058BOBJ1 43 162 Span 4 Left Exterior Girder 35.0016 After Str I-DL 24 Combination -4.851 20.673 7.545 9.3406 17.0688 105.414 162 17.5 -0.7058BOBJ1 44 172 Span 4 Left Exterior Girder 45.0016 Before Str I-DL 24 Combination -11.845 40.725 6.241 17.4293 -33.2127 -196.534 172 17.5 -0.7058BOBJ1 45 172 Span 4 Left Exterior Girder 45.0016 After Str I-DL 24 Combination -13.74 41.741 1.266 13.6859 -27.7545 -195.167 172 17.5 -0.7058BOBJ1 46 177 Span 4 Left Exterior Girder 50.0031 Before Str I-DL 24 Combination -14.227 51.971 -7.844 16.6712 -11.8771 -427.144 177 17.375 -0.8237BOBJ1 47 177 Span 5 Left Exterior Girder 0 After Str I-DL 24 Combination -14.543 -52.114 7.091 -17.1889 -13.1301 -427.494 177 17.375 -0.8237

Page 74 ends

Total Dead Load with 24" Water Pipe
BOBJ1 48 182 Span 5 Left Exterior Girder 5.0016 Before Str I-DL 24 Combination -13.565 -42.084 -1.999 -14.1915 -26.9715 -194.691 182 17.5 -0.7058 BOBJ1 49 182 Span 5 Left Exterior Girder 5.0016 After Str I-DL 24 Combination -11.031 -40.854 -6.97 -17.88 -34.671 -196.509 182 17.5 -0.7058BOBJ1 50 192 Span 5 Left Exterior Girder 15.0016 Before Str I-DL 24 Combination -2.712 -20.802 -8.197 -9.7394 18.0047 105.7589 192 17.5 -0.7058BOBJ1 51 192 Span 5 Left Exterior Girder 15.0016 After Str I-DL 24 Combination 1.423 -19.623 -6.626 -8.3122 4.2617 102.8106 192 17.5 -0.7058BOBJ1 52 202 Span 5 Left Exterior Girder 25.0016 Before Str I-DL 24 Combination 7.509 0.278 -5.003 2.7068 40.8543 195.162 202 17.5 -0.7058BOBJ1 53 202 Span 5 Left Exterior Girder 25.0016 After Str I-DL 24 Combination 7.653 0.167 4.827 -2.8291 40.3137 195.0399 202 17.5 -0.7058BOBJ1 54 212 Span 5 Left Exterior Girder 35.0016 Before Str I-DL 24 Combination 2.109 20.063 6.428 8.1932 3.795 97.8483 212 17.5 -0.7058BOBJ1 55 212 Span 5 Left Exterior Girder 35.0016 After Str I-DL 24 Combination -1.679 21.236 7.969 9.6152 16.2959 100.5675 212 17.5 -0.7058BOBJ1 56 222 Span 5 Left Exterior Girder 45.0016 Before Str I-DL 24 Combination -9.215 41.275 6.53 17.6392 -35.8004 -206.559 222 17.5 -0.7058BOBJ1 57 222 Span 5 Left Exterior Girder 45.0016 After Str I-DL 24 Combination -11.266 42.287 1.384 13.781 -29.8131 -205.081 222 17.5 -0.7058BOBJ1 58 227 Span 5 Left Exterior Girder 50.0031 Before Str I-DL 24 Combination -11.828 52.515 -8.008 16.6062 -13.2821 -440.004 227 17.375 -0.8237BOBJ1 59 227 Span 6 Left Exterior Girder 0 After Str I-DL 24 Combination -12.467 -53.583 7.502 -17.1264 -14.3612 -447.142 227 17.375 -0.8237BOBJ1 60 232 Span 6 Left Exterior Girder 5.0016 Before Str I-DL 24 Combination -11.482 -43.554 -2.078 -14.3483 -29.3344 -206.757 232 17.5 -0.7058BOBJ1 61 232 Span 6 Left Exterior Girder 5.0016 After Str I-DL 24 Combination -8.838 -42.33 -7.348 -18.2435 -37.3722 -208.653 232 17.5 -0.7058BOBJ1 62 242 Span 6 Left Exterior Girder 15.0016 Before Str I-DL 24 Combination -0.015 -22.291 -8.755 -10.1966 18.4819 108.0796 242 17.5 -0.7058BOBJ1 63 242 Span 6 Left Exterior Girder 15.0016 After Str I-DL 24 Combination 4.43 -21.116 -7.194 -8.76 3.7068 104.9094 242 17.5 -0.7058BOBJ1 64 252 Span 6 Left Exterior Girder 25.0016 Before Str I-DL 24 Combination 11.168 -1.217 -5.555 2.3012 43.722 211.7426 252 17.5 -0.7058BOBJ1 65 252 Span 6 Left Exterior Girder 25.0016 After Str I-DL 24 Combination 11.701 -1.284 4.11 -3.4719 41.9328 211.3626 252 17.5 -0.7058BOBJ1 66 262 Span 6 Left Exterior Girder 35.0016 Before Str I-DL 24 Combination 6.98 18.631 5.813 7.5942 9.341 128.0051 262 17.5 -0.7058BOBJ1 67 262 Span 6 Left Exterior Girder 35.0016 After Str I-DL 24 Combination 3.475 19.821 7.471 9.0694 20.9037 130.5214 262 17.5 -0.7058BOBJ1 68 272 Span 6 Left Exterior Girder 45.0016 Before Str I-DL 24 Combination -4.084 39.911 6.759 17.5017 -29.2224 -162.682 272 17.5 -0.7058BOBJ1 69 272 Span 6 Left Exterior Girder 45.0016 After Str I-DL 24 Combination -6.446 40.945 2.278 14.0773 -22.1011 -160.981 272 17.5 -0.7058BOBJ1 70 277 Span 6 Left Exterior Girder 50.0031 Before Str I-DL 24 Combination -7.41 51.18 -6.18 17.6456 -10.2626 -389.438 277 17.375 -0.8237BOBJ1 71 277 Span 7 Left Exterior Girder 0 After Str I-DL 24 Combination -3.42 -45.387 6.257 -14.4302 -10.2981 -352.337 277 17.375 -0.8237BOBJ1 72 282 Span 7 Left Exterior Girder 5.0016 Before Str I-DL 24 Combination -2.926 -35.379 -1.284 -10.9465 -23.511 -151.475 282 17.5 -0.7058BOBJ1 73 282 Span 7 Left Exterior Girder 5.0016 After Str I-DL 24 Combination -1.029 -34.051 -5.317 -13.8076 -29.1703 -152.842 282 17.5 -0.7058BOBJ1 74 289.9063 Span 7 Left Exterior Girder 12.9078 Before Str I-DL 24 Combination 2.218 -18.705 -6.394 -7.2456 6.6985 53.3867 289.9063 17.5 -0.7058BOBJ1 75 289.9063 Span 7 Left Exterior Girder 12.9078 After Str I-DL 24 Combination 5.573 -17.273 -5.357 -6.1081 -4.3379 50.9872 289.9063 17.5 -0.7058BOBJ1 76 297.8125 Span 7 Left Exterior Girder 20.8141 Before Str I-DL 24 Combination 8.304 -1.993 -4.596 2.0545 25.831 125.1963 297.8125 17.5 -0.7058BOBJ1 77 297.8125 Span 7 Left Exterior Girder 20.8141 After Str I-DL 24 Combination 8.637 -0.861 3.53 -2.931 24.774 124.9816 297.8125 17.5 -0.7058BOBJ1 78 305.7188 Span 7 Left Exterior Girder 28.7203 Before Str I-DL 24 Combination 6.53 14.432 4.36 5.2416 0.6814 72.8377 305.7188 17.5 -0.7058BOBJ1 79 305.7188 Span 7 Left Exterior Girder 28.7203 After Str I-DL 24 Combination 3.638 15.889 5.573 6.4454 10.2105 74.9062 305.7188 17.5 -0.7058BOBJ1 80 313.625 Span 7 Left Exterior Girder 36.6266 Before Str I-DL 24 Combination 0.577 31.267 4.981 13.269 -21.6206 -109.317 313.625 17.5 -0.7058BOBJ1 81 313.625 Span 7 Left Exterior Girder 36.6266 After Str I-DL 24 Combination -1.491 32.415 1.834 10.9337 -15.2881 -107.832 313.625 17.5 -0.7058BOBJ1 82 318.625 Span 7 Left Exterior Girder 41.6281 Before Str I-DL 24 Combination -2.12 42.645 -4.619 15.3872 -6.7998 -294.48 318.625 17.375 -0.8237BOBJ1 83 318.625 Span 8 Left Exterior Girder 0 After Str I-DL 24 Combination -3.812 -46.153 4.252 -19.1382 -5.7773 -311.719 318.625 17.375 -0.8237BOBJ1 84 323.625 Span 8 Left Exterior Girder 5.0016 Before Str I-DL 24 Combination -2.716 -36.108 -2.522 -14.6169 -13.0816 -107.594 323.625 17.5 -0.7058BOBJ1 85 323.625 Span 8 Left Exterior Girder 5.0016 After Str I-DL 24 Combination -0.66 -34.955 -5.77 -17.0775 -19.3066 -109.068 323.625 17.5 -0.7058BOBJ1 86 332.0833 Span 8 Left Exterior Girder 13.4599 Before Str I-DL 24 Combination 4.697 -17.985 -5.988 -9.7327 15.5281 110.9337 332.0833 17.5 -0.7058BOBJ1 87 332.0833 Span 8 Left Exterior Girder 13.4599 After Str I-DL 24 Combination 6.929 -16.989 -4.354 -8.4623 8.3077 109.3411 332.0833 17.5 -0.7058BOBJ1 88 340.5417 Span 8 Left Exterior Girder 21.9182 Before Str I-DL 24 Combination 8.827 -0.207 -0.389 2.4076 22.5775 180.6947 340.5417 17.5 -0.7058BOBJ1 89 340.5417 Span 8 Left Exterior Girder 21.9182 After Str I-DL 24 Combination 8.256 0.753 1.805 4.2344 24.5778 181.1108 340.5417 17.5 -0.7058BOBJ1 90 349 Span 8 Left Exterior Girder 30.3766 Before Str I-DL 24 Combination 4.521 17.628 4.759 14.3352 8.4737 106.1014 349 17.5 -0.7058BOBJ1 91 349 Span 8 Left Exterior Girder 30.3766 After Str I-DL 24 Combination 2.045 18.647 4.963 14.503 16.5641 107.8815 349 17.5 -0.7058BOBJ1 92 354 Span 8 Left Exterior Girder 35.3766 Before Str I-DL 24 Combination -0.376 28.395 2.692 17.2265 5.3622 -7.991 354 17.5 -0.7058BOBJ1 1 0 Span 1 Interior Girder 1 0 After Str I-DL 24 Combination 0.764 -20.956 -3.895 -5.5825 -3.6126 12.6404 8.88E-16 1.05E+01 -0.8108BOBJ1 2 5 Span 1 Interior Girder 1 5 Before Str I-DL 24 Combination -0.767 -13.609 -3.198 -5.1372 2.8421 100.1508 5 10.5 -0.8108BOBJ1 3 5 Span 1 Interior Girder 1 5 After Str I-DL 24 Combination -2.5 -12.942 -2.675 -4.6599 -7.5219 101.3924 5 10.5 -0.8108BOBJ1 4 13.4583 Span 1 Interior Girder 1 13.4583 Before Str I-DL 24 Combination -5.361 0.005954 -0.801 -2.2218 -5.4667 158.2086 13.4583 10.5 -0.8108BOBJ1 5 13.4583 Span 1 Interior Girder 1 13.4583 After Str I-DL 24 Combination -5.826 0.855 0.559 -0.5205 -6.177 158.5358 13.4583 10.5 -0.8108

Page 75 ends

BOBJ1 6 21.9167 Span 1 Interior Girder 1 21.9167 Before Str I-DL 24 Combination -4.232 13.932 2.919 2.5875 -9.5986 94.8429 21.9167 10.5 -0.8108 BOBJ1 7 21.9167 Span 1 Interior Girder 1 21.9167 After Str I-DL 24 Combination -2.33 14.758 3.534 3.5524 1.3603 93.4737 21.9167 10.5 -0.8108BOBJ1 8 30.375 Span 1 Interior Girder 1 30.375 Before Str I-DL 24 Combination 2.51 27.649 2.898 3.5056 -1.4818 -89.4011 30.375 10.5 -0.8108BOBJ1 9 30.375 Span 1 Interior Girder 1 30.375 After Str I-DL 24 Combination 4.381 28.315 2.254 2.9248 8.7633 -90.7475 30.375 10.5 -0.8108BOBJ1 10 35.375 Span 1 Interior Girder 1 35.375 Before Str I-DL 24 Combination 5.389 36.326 2.172 2.9003 3.7556 -253.122 35.375 10.5 -0.9268BOBJ1 11 35.375 Span 2 Interior Girder 1 0 After Str I-DL 24 Combination 3.21 -34.806 -0.498 -2.0531 6.3359 -253.333 35.375 10.5 -0.9268BOBJ1 12 40.375 Span 2 Interior Girder 1 5 Before Str I-DL 24 Combination 2.918 -26.77 -0.728 -2.3511 6.9257 -99.3823 40.375 10.5 -0.8108BOBJ1 13 40.375 Span 2 Interior Girder 1 5 After Str I-DL 24 Combination 1.495 -25.94 -1.714 -3.2163 -1.2854 -98.3586 40.375 10.5 -0.8108BOBJ1 14 48.2813 Span 2 Interior Girder 1 12.9063 Before Str I-DL 24 Combination -0.579 -14.269 -2.631 -3.8046 3.5434 62.0743 48.2813 10.5 -0.8108BOBJ1 15 48.2813 Span 2 Interior Girder 1 12.9063 After Str I-DL 24 Combination -2.434 -13.21 -2.215 -3.3123 -8.1455 63.3993 48.2813 10.5 -0.8108BOBJ1 16 56.1875 Span 2 Interior Girder 1 20.8125 Before Str I-DL 24 Combination -4.033 -1.487 -0.611 -1.8708 -4.0245 122.6389 56.1875 10.5 -0.8108BOBJ1 17 56.1875 Span 2 Interior Girder 1 20.8125 After Str I-DL 24 Combination -4.006 4.757 2.726 4.0994 0.1516 122.6151 56.1875 10.5 -0.8108BOBJ1 18 64.0938 Span 2 Interior Girder 1 28.7188 Before Str I-DL 24 Combination -2.364 16.495 4.185 5.4026 -11.8299 37.4313 64.0938 10.5 -0.8108BOBJ1 19 64.0938 Span 2 Interior Girder 1 28.7188 After Str I-DL 24 Combination -0.544 17.581 4.254 5.6072 7.2553 36.1318 64.0938 10.5 -0.8108BOBJ1 20 72 Span 2 Interior Girder 1 36.625 Before Str I-DL 24 Combination 1.354 29.292 2.791 4.5959 -2.4146 -150.521 72 10.5 -0.8108BOBJ1 21 72 Span 2 Interior Girder 1 36.625 After Str I-DL 24 Combination 2.469 30.149 1.345 3.3575 8.7572 -151.326 72 10.5 -0.8108BOBJ1 22 77 Span 2 Interior Girder 1 41.625 Before Str I-DL 24 Combination 2.592 38.207 0.898 2.9287 7.3925 -322.033 77 10.5 -0.9268BOBJ1 23 77 Span 3 Interior Girder 1 0 After Str I-DL 24 Combination 2.581 -42.412 -0.481 -3.0379 8.4859 -341.487 77 10.5 -0.9268BOBJ1 24 82 Span 3 Interior Girder 1 5 Before Str I-DL 24 Combination 1.861 -34.377 -0.934 -3.5597 8.6823 -149.27 82 10.5 -0.8108BOBJ1 25 82 Span 3 Interior Girder 1 5 After Str I-DL 24 Combination 0.022 -33.629 -2.337 -4.7724 -0.3174 -147.952 82 10.5 -0.8108BOBJ1 26 92 Span 3 Interior Girder 1 15 Before Str I-DL 24 Combination -5.305 -18.411 -4.318 -6.0891 3.5742 116.0997 92 10.5 -0.8108BOBJ1 27 92 Span 3 Interior Girder 1 15 After Str I-DL 24 Combination -7.449 -17.481 -3.948 -5.464 -11.9257 117.6228 92 10.5 -0.8108BOBJ1 28 102 Span 3 Interior Girder 1 25 Before Str I-DL 24 Combination -10.709 -2.191 -0.675 -2.4457 -5.7593 218.3247 102 10.5 -0.8108BOBJ1 29 102 Span 3 Interior Girder 1 25 After Str I-DL 24 Combination -10.893 4.761 4.242 5.208 0.1075 218.4559 102 10.5 -0.8108BOBJ1 30 112 Span 3 Interior Girder 1 35 Before Str I-DL 24 Combination -8.296 20.067 7.36 8.1109 -17.7966 92.4834 112 10.5 -0.8108BOBJ1 31 112 Span 3 Interior Girder 1 35 After Str I-DL 24 Combination -6.537 21.015 7.518 8.59 8.6976 91.2178 112 10.5 -0.8108BOBJ1 32 122 Span 3 Interior Girder 1 45 Before Str I-DL 24 Combination -2.016 36.288 4.726 6.6898 -4.1357 -198.54 122 10.5 -0.8108BOBJ1 33 122 Span 3 Interior Girder 1 45 After Str I-DL 24 Combination -0.633 37.071 2.842 5.1329 11.5535 -199.54 122 10.5 -0.8108BOBJ1 34 127 Span 3 Interior Girder 1 50 Before Str I-DL 24 Combination -0.367 45.115 2.1 4.5583 6.4647 -404.583 127 10.5 -0.9268BOBJ1 35 127 Span 4 Interior Girder 1 0 After Str I-DL 24 Combination -0.287 -44.098 -1.734 -4.1905 6.8663 -396.383 127 10.5 -0.9268BOBJ1 36 132 Span 4 Interior Girder 1 5 Before Str I-DL 24 Combination -0.597 -36.051 -2.475 -4.7932 10.8863 -196.39 132 10.5 -0.8108BOBJ1 37 132 Span 4 Interior Girder 1 5 After Str I-DL 24 Combination -1.987 -35.274 -4.316 -6.3168 -3.6786 -195.393 132 10.5 -0.8108BOBJ1 38 142 Span 4 Interior Girder 1 15 Before Str I-DL 24 Combination -6.398 -19.992 -7.107 -8.1597 7.9023 84.1208 142 10.5 -0.8108BOBJ1 39 142 Span 4 Interior Girder 1 15 After Str I-DL 24 Combination -8.158 -19.044 -6.955 -7.6609 -17.2052 85.369 142 10.5 -0.8108BOBJ1 40 152 Span 4 Interior Girder 1 25 Before Str I-DL 24 Combination -10.68 -3.739 -3.877 -4.7249 -0.426 201.084 152 10.5 -0.8108BOBJ1 41 152 Span 4 Interior Girder 1 25 After Str I-DL 24 Combination -10.492 3.143 1.379 3.1825 -4.5207 200.981 152 10.5 -0.8108BOBJ1 42 162 Span 4 Interior Girder 1 35 Before Str I-DL 24 Combination -7.181 18.445 4.465 6.0833 -12.6834 90.694 162 10.5 -0.8108BOBJ1 43 162 Span 4 Interior Girder 1 35 After Str I-DL 24 Combination -5.085 19.39 4.64 6.5847 4.2518 89.1875 162 10.5 -0.8108BOBJ1 44 172 Span 4 Interior Girder 1 45 Before Str I-DL 24 Combination -0.022 34.653 2.011 4.8266 0.8163 -184.662 172 10.5 -0.8108BOBJ1 45 172 Span 4 Interior Girder 1 45 After Str I-DL 24 Combination 1.566 35.429 0.267 3.4058 8.695 -185.808 172 10.5 -0.8108BOBJ1 46 177 Span 4 Interior Girder 1 50 Before Str I-DL 24 Combination 2.011 43.472 -0.349 2.667 10.7963 -383.044 177 10.5 -0.9268BOBJ1 47 177 Span 5 Interior Girder 1 0 After Str I-DL 24 Combination 2.93 -43.505 -1.377 -3.9343 8.1474 -382.938 177 10.5 -0.9268BOBJ1 48 182 Span 5 Interior Girder 1 5 Before Str I-DL 24 Combination 2.598 -35.462 -2.005 -4.4922 10.8689 -185.512 182 10.5 -0.8108BOBJ1 49 182 Span 5 Interior Girder 1 5 After Str I-DL 24 Combination 1.157 -34.693 -3.729 -5.9387 -1.9907 -184.48 182 10.5 -0.8108BOBJ1 50 192 Span 5 Interior Girder 1 15 Before Str I-DL 24 Combination -3.377 -19.429 -6.355 -7.6987 7.3558 89.4065 192 10.5 -0.8108BOBJ1 51 192 Span 5 Interior Girder 1 15 After Str I-DL 24 Combination -5.206 -18.486 -6.167 -7.1899 -15.2154 90.7045 192 10.5 -0.8108BOBJ1 52 202 Span 5 Interior Girder 1 25 Before Str I-DL 24 Combination -7.872 -3.187 -3.057 -4.2542 -1.2264 200.9801 202 10.5 -0.8108BOBJ1 53 202 Span 5 Interior Girder 1 25 After Str I-DL 24 Combination -7.751 3.699 2.192 3.654 -2.6442 200.9126 202 10.5 -0.8108BOBJ1 54 212 Span 5 Interior Girder 1 35 Before Str I-DL 24 Combination -4.56 19.004 5.26 6.5667 -13.5893 85.1426 212 10.5 -0.8108BOBJ1 55 212 Span 5 Interior Girder 1 35 After Str I-DL 24 Combination -2.537 19.954 5.391 7.0536 5.8943 83.6876 212 10.5 -0.8108

Page 76 ends

BOBJ1 56 222 Span 5 Interior Girder 1 45 Before Str I-DL 24 Combination 2.339 35.231 2.566 5.1908 0.3129 -195.734 222 10.5 -0.8108 BOBJ1 57 222 Span 5 Interior Girder 1 45 After Str I-DL 24 Combination 3.804 36.015 0.72 3.7052 9.7114 -196.793 222 10.5 -0.8108BOBJ1 58 227 Span 5 Interior Girder 1 50 Before Str I-DL 24 Combination 4.135 44.061 0.055 2.9797 10.5957 -397.131 227 10.5 -0.9268BOBJ1 59 227 Span 6 Interior Girder 1 0 After Str I-DL 24 Combination 4.698 -45.039 -1.511 -4.0614 8.4233 -403.994 227 10.5 -0.9268BOBJ1 60 232 Span 6 Interior Girder 1 5 Before Str I-DL 24 Combination 4.449 -36.995 -2.211 -4.6486 11.6547 -198.753 232 10.5 -0.8108BOBJ1 61 232 Span 6 Interior Girder 1 5 After Str I-DL 24 Combination 3.048 -36.221 -4.07 -6.1742 -2.1126 -197.749 232 10.5 -0.8108BOBJ1 62 242 Span 6 Interior Girder 1 15 Before Str I-DL 24 Combination -1.58 -20.945 -6.912 -8.0488 8.6114 91.4202 242 10.5 -0.8108BOBJ1 63 242 Span 6 Interior Girder 1 15 After Str I-DL 24 Combination -3.473 -19.997 -6.762 -7.5573 -15.9108 92.7636 242 10.5 -0.8108BOBJ1 64 252 Span 6 Interior Girder 1 25 Before Str I-DL 24 Combination -6.305 -4.691 -3.636 -4.6127 0.0032 218.2327 252 10.5 -0.8108BOBJ1 65 252 Span 6 Interior Girder 1 25 After Str I-DL 24 Combination -6.26 2.277 1.29 3.0466 -3.8598 218.2299 252 10.5 -0.8108BOBJ1 66 262 Span 6 Interior Girder 1 35 Before Str I-DL 24 Combination -3.183 17.566 4.57 6.0388 -12.0909 116.8285 262 10.5 -0.8108BOBJ1 67 262 Span 6 Interior Girder 1 35 After Str I-DL 24 Combination -1.167 18.441 4.934 6.6727 5.4341 115.3787 262 10.5 -0.8108BOBJ1 68 272 Span 6 Interior Girder 1 45 Before Str I-DL 24 Combination 3.999 33.648 2.949 5.2968 -0.4442 -148.775 272 10.5 -0.8108BOBJ1 69 272 Span 6 Interior Girder 1 45 After Str I-DL 24 Combination 5.722 34.402 1.535 4.064 10.2203 -150.018 272 10.5 -0.8108BOBJ1 70 277 Span 6 Interior Girder 1 50 Before Str I-DL 24 Combination 6.329 42.438 1.139 3.6406 8.1838 -342.716 277 10.5 -0.9268BOBJ1 71 277 Span 7 Interior Girder 1 0 After Str I-DL 24 Combination 5.709 -38.03 -0.313 -2.288 8.6258 -319.265 277 10.5 -0.9268BOBJ1 72 282 Span 7 Interior Girder 1 5 Before Str I-DL 24 Combination 5.551 -29.971 -0.767 -2.7619 8.3513 -149.058 282 10.5 -0.8108BOBJ1 73 282 Span 7 Interior Girder 1 5 After Str I-DL 24 Combination 4.395 -29.115 -2.227 -3.9594 -1.014 -148.224 282 10.5 -0.8108BOBJ1 74 289.9063 Span 7 Interior Girder 1 12.9063 Before Str I-DL 24 Combination 2.419 -17.405 -3.704 -4.9226 6.5205 37.0855 289.9063 10.5 -0.8108BOBJ1 75 289.9063 Span 7 Interior Girder 1 12.9063 After Str I-DL 24 Combination 0.516 -16.318 -3.645 -4.6743 -10.3451 38.4445 289.9063 10.5 -0.8108BOBJ1 76 297.8125 Span 7 Interior Girder 1 20.8125 Before Str I-DL 24 Combination -1.209 -4.581 -2.176 -3.3278 -0.4355 122.2934 297.8125 10.5 -0.8108BOBJ1 77 297.8125 Span 7 Interior Girder 1 20.8125 After Str I-DL 24 Combination -1.318 1.646 1.19 2.6919 -2.3783 122.3617 297.8125 10.5 -0.8108BOBJ1 78 305.7188 Span 7 Interior Girder 1 28.7188 Before Str I-DL 24 Combination 0.198 13.369 2.811 4.1135 -8.718 61.9249 305.7188 10.5 -0.8108BOBJ1 79 305.7188 Span 7 Interior Girder 1 28.7188 After Str I-DL 24 Combination 1.961 14.428 3.214 4.5454 5.3965 60.6655 305.7188 10.5 -0.8108BOBJ1 80 313.625 Span 7 Interior Girder 1 36.625 Before Str I-DL 24 Combination 3.913 26.1 2.253 3.8604 -1.5182 -100.943 313.625 10.5 -0.8108BOBJ1 81 313.625 Span 7 Interior Girder 1 36.625 After Str I-DL 24 Combination 5.232 26.932 1.235 2.9177 8.4645 -101.892 313.625 10.5 -0.8108BOBJ1 82 318.625 Span 7 Interior Girder 1 41.625 Before Str I-DL 24 Combination 5.442 34.968 1.03 2.6675 6.5361 -256.855 318.625 10.5 -0.9268BOBJ1 83 318.625 Span 8 Interior Girder 1 0 After Str I-DL 24 Combination 6.827 -36.581 -1.263 -2.4773 6.2184 -258.931 318.625 10.5 -0.9268BOBJ1 84 323.625 Span 8 Interior Girder 1 5 Before Str I-DL 24 Combination 5.789 -28.57 -1.313 -2.594 8.5801 -95.092 323.625 10.5 -0.8108BOBJ1 85 323.625 Span 8 Interior Girder 1 5 After Str I-DL 24 Combination 3.875 -27.911 -1.953 -3.2108 0.7362 -93.7201 323.625 10.5 -0.8108BOBJ1 86 332.0833 Span 8 Interior Girder 1 13.4583 Before Str I-DL 24 Combination -1.148 -15.017 -2.639 -3.3817 0.7904 91.4816 332.0833 10.5 -0.8108BOBJ1 87 332.0833 Span 8 Interior Girder 1 13.4583 After Str I-DL 24 Combination -3.183 -14.192 -2.04 -2.4941 -7.7789 92.9331 332.0833 10.5 -0.8108BOBJ1 88 340.5417 Span 8 Interior Girder 1 21.9167 Before Str I-DL 24 Combination -5.012 -1.118 0.265 0.4376 -6.8956 158.9969 340.5417 10.5 -0.8108BOBJ1 89 340.5417 Span 8 Interior Girder 1 21.9167 After Str I-DL 24 Combination -4.694 -0.273 1.583 2.0385 -3.9941 158.7619 340.5417 10.5 -0.8108BOBJ1 90 349 Span 8 Interior Girder 1 30.375 Before Str I-DL 24 Combination -2.137 12.666 3.349 4.2227 -8.0514 104.4556 349 10.5 -0.8108BOBJ1 91 349 Span 8 Interior Girder 1 30.375 After Str I-DL 24 Combination -0.599 13.331 3.788 4.6027 4.0125 103.347 349 10.5 -0.8108BOBJ1 92 354 Span 8 Interior Girder 1 35.375 Before Str I-DL 24 Combination 0.71 20.66 4.505 5.0638 -4.2314 17.4237 354 10.5 -0.8108BOBJ1 1 0 Span 1 Interior Girder 2 0 After Str I-DL 24 Combination -0.334 -21.367 -0.843 -1.9717 -1.7543 6.0833 2.96E-16 3.50E+00 -0.9158BOBJ1 2 5 Span 1 Interior Girder 2 5 Before Str I-DL 24 Combination -1.154 -13.909 -0.613 -1.6828 -1.0777 94.8603 5.00E+00 3.50E+00 -0.9158BOBJ1 3 5 Span 1 Interior Girder 2 5 After Str I-DL 24 Combination -1.805 -13.14 -0.276 -1.3512 -2.9978 95.3261 5 3.5 -0.9158BOBJ1 4 13.4583 Span 1 Interior Girder 2 13.4583 Before Str I-DL 24 Combination -2.347 -0.125 0.104 -0.7012 -3.4493 151.8004 13.4583 3.5 -0.9158BOBJ1 5 13.4583 Span 1 Interior Girder 2 13.4583 After Str I-DL 24 Combination -2.235 0.672 0.3 -0.4489 -2.9111 151.7204 13.4583 3.5 -0.9158BOBJ1 6 21.9167 Span 1 Interior Girder 2 21.9167 Before Str I-DL 24 Combination -1.296 13.636 0.347 -0.1047 -2.9687 90.5277 21.9167 3.5 -0.9158BOBJ1 7 21.9167 Span 1 Interior Girder 2 21.9167 After Str I-DL 24 Combination -0.605 14.415 0.335 -0.0468 -1.135 90.033 21.9167 3.5 -0.9158BOBJ1 8 30.375 Span 1 Interior Girder 2 30.375 Before Str I-DL 24 Combination 0.747 27.365 0.062 -0.057 0.5608 -87.6275 30.375 3.5 -0.9158BOBJ1 9 30.375 Span 1 Interior Girder 2 30.375 After Str I-DL 24 Combination 1.37 28.103 0.082 -0.0416 1.9458 -88.0733 30.375 3.5 -0.9158BOBJ1 10 35.375 Span 1 Interior Girder 2 35.375 Before Str I-DL 24 Combination 1.801 36.231 0.02 0.0471 2.6852 -248.845 35.375 3.5 -1.0318BOBJ1 11 35.375 Span 2 Interior Girder 2 0 After Str I-DL 24 Combination 2.629 -33.913 0.541 -0.1757 3.8867 -242.203 35.375 3.5 -1.0318BOBJ1 12 40.375 Span 2 Interior Girder 2 5 Before Str I-DL 24 Combination 2.148 -25.788 0.467 -0.1927 1.6583 -92.8842 40.375 3.5 -0.9158BOBJ1 13 40.375 Span 2 Interior Girder 2 5 After Str I-DL 24 Combination 1.238 -24.888 0.409 -0.2713 1.7143 -92.2328 40.375 3.5 -0.9158

Page 77 ends

BOBJ1 14 48.2813 Span 2 Interior Girder 2 12.9063 Before Str I-DL 24 Combination -0.055 -13.122 0.141 -0.3486 -0.9597 58.9509 48.2813 3.5 -0.9158 BOBJ1 15 48.2813 Span 2 Interior Girder 2 12.9063 After Str I-DL 24 Combination -1.417 -11.983 0.338 -0.1467 -1.3825 59.9262 48.2813 3.5 -0.9158BOBJ1 16 56.1875 Span 2 Interior Girder 2 20.8125 Before Str I-DL 24 Combination -2.251 -0.182 1.007 0.5369 -5.2194 108.6167 56.1875 3.5 -0.9158BOBJ1 17 56.1875 Span 2 Interior Girder 2 20.8125 After Str I-DL 24 Combination -2.061 3.307 0.684 1.2721 -1.7973 108.4427 56.1875 3.5 -0.9158BOBJ1 18 64.0938 Span 2 Interior Girder 2 28.7188 Before Str I-DL 24 Combination -0.863 15.085 1.324 1.9163 -4.3396 34.8751 64.0938 3.5 -0.9158BOBJ1 19 64.0938 Span 2 Interior Girder 2 28.7188 After Str I-DL 24 Combination 0.747 16.175 1.494 2.1057 2.7364 33.7219 64.0938 3.5 -0.9158BOBJ1 20 72 Span 2 Interior Girder 2 36.625 Before Str I-DL 24 Combination 2.011 27.872 1.224 2.0791 -0.9729 -141.308 72 3.5 -0.9158BOBJ1 21 72 Span 2 Interior Girder 2 36.625 After Str I-DL 24 Combination 2.455 28.704 1.097 2.0345 4.6238 -141.627 72 3.5 -0.9158BOBJ1 22 77 Span 2 Interior Girder 2 41.625 Before Str I-DL 24 Combination 2.43 36.79 0.846 2.1109 3.6487 -305.042 77 3.5 -1.0318BOBJ1 23 77 Span 3 Interior Girder 2 0 After Str I-DL 24 Combination 3.519 -41.522 1.622 0.789 7.0876 -326.229 77 3.5 -1.0318BOBJ1 24 82 Span 3 Interior Girder 2 5 Before Str I-DL 24 Combination 2.503 -33.365 1.499 0.4638 2.0758 -138.458 82 3.5 -0.9158BOBJ1 25 82 Span 3 Interior Girder 2 5 After Str I-DL 24 Combination 1.116 -32.51 1.245 0.0327 4.4844 -137.466 82 3.5 -0.9158BOBJ1 26 92 Span 3 Interior Girder 2 15 Before Str I-DL 24 Combination -2.491 -17.084 0.232 -0.9166 -2.0596 113.0893 92 3.5 -0.9158BOBJ1 27 92 Span 3 Interior Girder 2 15 After Str I-DL 24 Combination -4.551 -16.098 0.276 -0.9009 -2.8532 114.5635 92 3.5 -0.9158BOBJ1 28 102 Span 3 Interior Girder 2 25 Before Str I-DL 24 Combination -7.59 -0.644 2.115 0.7406 -9.5762 200.4415 102 3.5 -0.9158BOBJ1 29 102 Span 3 Interior Girder 2 25 After Str I-DL 24 Combination -7.537 3.145 1.683 2.0955 -3.2608 200.3897 102 3.5 -0.9158BOBJ1 30 112 Span 3 Interior Girder 2 35 Before Str I-DL 24 Combination -4.303 18.578 3.418 3.6781 -8.9684 89.4508 112 3.5 -0.9158BOBJ1 31 112 Span 3 Interior Girder 2 35 After Str I-DL 24 Combination -2.191 19.541 3.364 3.6416 3.9858 87.9396 112 3.5 -0.9158BOBJ1 32 122 Span 3 Interior Girder 2 45 Before Str I-DL 24 Combination 1.149 34.894 2.076 2.5552 -0.9633 -186.642 122 3.5 -0.9158BOBJ1 33 122 Span 3 Interior Girder 2 45 After Str I-DL 24 Combination 2.103 35.711 1.702 2.0599 6.4101 -187.325 122 3.5 -0.9158BOBJ1 34 127 Span 3 Interior Girder 2 50 Before Str I-DL 24 Combination 2.638 43.843 1.542 2.098 2.7157 -386.318 127 3.5 -1.0318BOBJ1 35 127 Span 4 Interior Girder 2 0 After Str I-DL 24 Combination 2.984 -42.705 -1.121 -1.989 3.2055 -378.015 127 3.5 -1.0318BOBJ1 36 132 Span 4 Interior Girder 2 5 Before Str I-DL 24 Combination 2.553 -34.597 -1.366 -1.9785 5.5327 -184.689 132 3.5 -0.9158BOBJ1 37 132 Span 4 Interior Girder 2 5 After Str I-DL 24 Combination 1.692 -33.817 -1.746 -2.3561 -1.0181 -184.072 132 3.5 -0.9158BOBJ1 38 142 Span 4 Interior Girder 2 15 Before Str I-DL 24 Combination -1.753 -18.533 -2.916 -3.1496 3.0324 80.1772 142 3.5 -0.9158BOBJ1 39 142 Span 4 Interior Girder 2 15 After Str I-DL 24 Combination -3.943 -17.588 -2.967 -3.1206 -8.2673 81.7444 142 3.5 -0.9158BOBJ1 40 152 Span 4 Interior Girder 2 25 Before Str I-DL 24 Combination -7.228 -2.166 -1.445 -1.6265 -3.3341 182.8854 152 3.5 -0.9158BOBJ1 41 152 Span 4 Interior Girder 2 25 After Str I-DL 24 Combination -7.201 1.584 -1.497 -0.1701 -8.2001 182.8782 152 3.5 -0.9158BOBJ1 42 162 Span 4 Interior Girder 2 35 Before Str I-DL 24 Combination -3.824 17.018 0.078 1.3067 -3.2159 87.4381 162 3.5 -0.9158BOBJ1 43 162 Span 4 Interior Girder 2 35 After Str I-DL 24 Combination -1.605 17.974 0.079 1.3352 -1.384 85.8497 162 3.5 -0.9158BOBJ1 44 172 Span 4 Interior Girder 2 45 Before Str I-DL 24 Combination 1.938 33.294 -0.906 0.6005 3.8025 -173.056 172 3.5 -0.9158BOBJ1 45 172 Span 4 Interior Girder 2 45 After Str I-DL 24 Combination 2.904 34.09 -1.196 0.2822 2.6018 -173.747 172 3.5 -0.9158BOBJ1 46 177 Span 4 Interior Girder 2 50 Before Str I-DL 24 Combination 3.459 42.208 -1.44 -0.0058 7.5554 -364.71 177 3.5 -1.0318BOBJ1 47 177 Span 5 Interior Girder 2 0 After Str I-DL 24 Combination 3.777 -42.216 -0.62 -1.5378 4.4989 -364.588 177 3.5 -1.0318BOBJ1 48 182 Span 5 Interior Girder 2 5 Before Str I-DL 24 Combination 3.316 -34.1 -0.836 -1.5788 5.2177 -173.612 182 3.5 -0.9158BOBJ1 49 182 Span 5 Interior Girder 2 5 After Str I-DL 24 Combination 2.424 -33.305 -1.112 -1.9126 0.6616 -172.973 182 3.5 -0.9158BOBJ1 50 192 Span 5 Interior Girder 2 15 Before Str I-DL 24 Combination -0.969 -17.986 -2.142 -2.6909 2.3729 85.9365 192 3.5 -0.9158BOBJ1 51 192 Span 5 Interior Girder 2 15 After Str I-DL 24 Combination -3.11 -17.029 -2.16 -2.6715 -6.3148 87.4687 192 3.5 -0.9158BOBJ1 52 202 Span 5 Interior Girder 2 25 Before Str I-DL 24 Combination -6.312 -1.595 -0.595 -1.1878 -4.2052 182.894 202 3.5 -0.9158BOBJ1 53 202 Span 5 Interior Girder 2 25 After Str I-DL 24 Combination -6.248 2.16 -0.676 0.252 -6.292 182.8393 202 3.5 -0.9158BOBJ1 54 212 Span 5 Interior Girder 2 35 Before Str I-DL 24 Combination -2.784 17.582 0.891 1.7661 -4.0773 81.6324 212 3.5 -0.9158BOBJ1 55 212 Span 5 Interior Girder 2 35 After Str I-DL 24 Combination -0.522 18.526 0.875 1.8183 0.4069 80.0132 212 3.5 -0.9158BOBJ1 56 222 Span 5 Interior Girder 2 45 Before Str I-DL 24 Combination 3.019 33.809 -0.145 1.1544 2.9195 -184.229 222 3.5 -0.9158BOBJ1 57 222 Span 5 Interior Girder 2 45 After Str I-DL 24 Combination 3.883 34.586 -0.445 0.8722 4.0209 -184.848 222 3.5 -0.9158BOBJ1 58 227 Span 5 Interior Girder 2 50 Before Str I-DL 24 Combination 4.327 42.692 -0.669 0.7161 6.9003 -378.281 227 3.5 -1.0318BOBJ1 59 227 Span 6 Interior Girder 2 0 After Str I-DL 24 Combination 4.212 -43.817 -0.997 -1.649 4.4551 -386.006 227 3.5 -1.0318BOBJ1 60 232 Span 6 Interior Girder 2 5 Before Str I-DL 24 Combination 3.714 -35.686 -1.138 -1.637 6.3884 -186.987 232 3.5 -0.9158BOBJ1 61 232 Span 6 Interior Girder 2 5 After Str I-DL 24 Combination 2.792 -34.87 -1.44 -2.0501 0.8878 -186.327 232 3.5 -0.9158BOBJ1 62 242 Span 6 Interior Girder 2 15 Before Str I-DL 24 Combination -0.557 -19.518 -2.617 -3.0109 3.6259 88.0291 242 3.5 -0.9158BOBJ1 63 242 Span 6 Interior Girder 2 15 After Str I-DL 24 Combination -2.697 -18.555 -2.649 -3.0137 -6.7953 89.5607 242 3.5 -0.9158

Page 78 ends

BOBJ1 64 252 Span 6 Interior Girder 2 25 Before Str I-DL 24 Combination -6.008 -3.121 -0.87 -1.3765 -3.7228 200.3166 252 3.5 -0.9158 BOBJ1 65 252 Span 6 Interior Girder 2 25 After Str I-DL 24 Combination -6.096 0.685 -1.364 -0.0461 -7.456 200.3935 252 3.5 -0.9158BOBJ1 66 262 Span 6 Interior Girder 2 35 Before Str I-DL 24 Combination -3.107 16.139 0.488 1.5884 -3.2049 114.1381 262 3.5 -0.9158BOBJ1 67 262 Span 6 Interior Girder 2 35 After Str I-DL 24 Combination -1.07 17.071 0.531 1.5641 0.1353 112.6804 262 3.5 -0.9158BOBJ1 68 272 Span 6 Interior Girder 2 45 Before Str I-DL 24 Combination 2.482 32.487 -0.464 0.601 4.0588 -137.647 272 3.5 -0.9158BOBJ1 69 272 Span 6 Interior Girder 2 45 After Str I-DL 24 Combination 3.817 33.339 -0.656 0.2014 3.8948 -138.602 272 3.5 -0.9158BOBJ1 70 277 Span 6 Interior Girder 2 50 Before Str I-DL 24 Combination 4.774 41.493 -0.694 0.0382 6.3844 -326.34 277 3.5 -1.0318BOBJ1 71 277 Span 7 Interior Girder 2 0 After Str I-DL 24 Combination 3.491 -36.718 -0.163 -1.3624 4.9729 -303.903 277 3.5 -1.0318BOBJ1 72 282 Span 7 Interior Girder 2 5 Before Str I-DL 24 Combination 3.468 -28.629 -0.421 -1.3538 4.1117 -140.698 282 3.5 -0.9158BOBJ1 73 282 Span 7 Interior Girder 2 5 After Str I-DL 24 Combination 2.978 -27.793 -0.563 -1.3752 0.6276 -140.345 282 3.5 -0.9158BOBJ1 74 289.9063 Span 7 Interior Girder 2 12.9063 Before Str I-DL 24 Combination 1.677 -16.092 -0.843 -1.3665 1.8177 34.0688 289.9063 3.5 -0.9158BOBJ1 75 289.9063 Span 7 Interior Girder 2 12.9063 After Str I-DL 24 Combination 0.036 -14.997 -0.69 -1.1472 -2.6352 35.2448 289.9063 3.5 -0.9158BOBJ1 76 297.8125 Span 7 Interior Girder 2 20.8125 Before Str I-DL 24 Combination -1.173 -3.216 -0.092 -0.5008 -2.377 108.1111 297.8125 3.5 -0.9158BOBJ1 77 297.8125 Span 7 Interior Girder 2 20.8125 After Str I-DL 24 Combination -1.342 0.233 -0.372 0.2325 -3.3501 108.2474 297.8125 3.5 -0.9158BOBJ1 78 305.7188 Span 7 Interior Girder 2 28.7188 Before Str I-DL 24 Combination -0.442 12.024 0.265 0.8775 -1.9172 59.1477 305.7188 3.5 -0.9158BOBJ1 79 305.7188 Span 7 Interior Girder 2 28.7188 After Str I-DL 24 Combination 1.012 13.141 0.49 1.0951 0.9288 58.106 305.7188 3.5 -0.9158BOBJ1 80 313.625 Span 7 Interior Girder 2 36.625 Before Str I-DL 24 Combination 2.354 24.873 0.323 1.1113 0.8125 -93.1297 313.625 3.5 -0.9158BOBJ1 81 313.625 Span 7 Interior Girder 2 36.625 After Str I-DL 24 Combination 3.149 25.738 0.306 1.1059 3.2884 -93.6995 313.625 3.5 -0.9158BOBJ1 82 318.625 Span 7 Interior Girder 2 41.625 Before Str I-DL 24 Combination 3.497 33.839 0.087 1.1007 4.0422 -242.714 318.625 3.5 -1.0318BOBJ1 83 318.625 Span 8 Interior Girder 2 0 After Str I-DL 24 Combination 1.907 -36.541 0.943 0.5617 5.2632 -252.614 318.625 3.5 -1.0318BOBJ1 84 323.625 Span 8 Interior Girder 2 5 Before Str I-DL 24 Combination 1.526 -28.402 0.803 0.4296 1.832 -90.3437 323.625 3.5 -0.9158BOBJ1 85 323.625 Span 8 Interior Girder 2 5 After Str I-DL 24 Combination 0.949 -27.642 0.857 0.3774 2.8346 -89.932 323.625 3.5 -0.9158BOBJ1 86 332.0833 Span 8 Interior Girder 2 13.4583 Before Str I-DL 24 Combination -0.25 -14.653 0.638 0.1851 -1.753 89.7905 332.0833 3.5 -0.9158BOBJ1 87 332.0833 Span 8 Interior Girder 2 13.4583 After Str I-DL 24 Combination -0.864 -13.863 0.626 0.1476 -1.0026 90.2306 332.0833 3.5 -0.9158BOBJ1 88 340.5417 Span 8 Interior Girder 2 21.9167 Before Str I-DL 24 Combination -1.7 -0.896 0.682 0.3711 -4.0123 153.2481 340.5417 3.5 -0.9158BOBJ1 89 340.5417 Span 8 Interior Girder 2 21.9167 After Str I-DL 24 Combination -1.795 -0.109 0.897 0.6078 -1.9095 153.3163 340.5417 3.5 -0.9158BOBJ1 90 349 Span 8 Interior Girder 2 30.375 Before Str I-DL 24 Combination -1.317 12.87 1.366 1.3017 -4.782 99.0091 349 3.5 -0.9158BOBJ1 91 349 Span 8 Interior Girder 2 30.375 After Str I-DL 24 Combination -0.763 13.628 1.793 1.7061 -0.1532 98.6124 349 3.5 -0.9158BOBJ1 92 354 Span 8 Interior Girder 2 35.375 Before Str I-DL 24 Combination -0.113 21.08 2.131 2.1263 -4.4647 11.3851 354 3.5 -0.9158BOBJ1 1 0 Span 1 Interior Girder 3 0 After Str I-DL 24 Combination -0.258 -21.304 1.552 0.1541 2.3587 5.9038 -2.96E-16 -3.50E+00 -1.0208BOBJ1 2 5 Span 1 Interior Girder 3 5 Before Str I-DL 24 Combination -0.997 -13.85 1.266 0.0375 -2.1721 94.3175 5 -3.5 -1.0208BOBJ1 3 5 Span 1 Interior Girder 3 5 After Str I-DL 24 Combination -1.618 -13.082 1.015 -0.1546 0.3592 94.7619 5 -3.5 -1.0208BOBJ1 4 13.4583 Span 1 Interior Girder 3 13.4583 Before Str I-DL 24 Combination -2.188 -0.066 0.143 -0.6899 -1.7752 150.7655 13.4583 -3.5 -1.0208BOBJ1 5 13.4583 Span 1 Interior Girder 3 13.4583 After Str I-DL 24 Combination -2.093 0.737 -0.252 -0.9688 -1.9603 150.6976 13.4583 -3.5 -1.0208BOBJ1 6 21.9167 Span 1 Interior Girder 3 21.9167 Before Str I-DL 24 Combination -1.203 13.716 -1.049 -1.3382 0.0253 88.9265 21.9167 -3.5 -1.0208BOBJ1 7 21.9167 Span 1 Interior Girder 3 21.9167 After Str I-DL 24 Combination -0.538 14.502 -1.172 -1.3473 -2.9167 88.4501 21.9167 -3.5 -1.0208BOBJ1 8 30.375 Span 1 Interior Girder 3 30.375 Before Str I-DL 24 Combination 0.776 27.46 -1.258 -1.0756 1.3931 -89.9564 30.375 -3.5 -1.0208BOBJ1 9 30.375 Span 1 Interior Girder 3 30.375 After Str I-DL 24 Combination 1.354 28.2 -1.233 -0.9511 -1.4454 -90.3701 30.375 -3.5 -1.0208BOBJ1 10 35.375 Span 1 Interior Girder 3 35.375 Before Str I-DL 24 Combination 1.746 36.33 -1.409 -0.9788 3.2574 -251.597 35.375 -3.5 -1.1368BOBJ1 11 35.375 Span 2 Interior Girder 3 0 After Str I-DL 24 Combination 2.808 -34.023 1.969 1.5982 4.0143 -243.872 35.375 -3.5 -1.1368BOBJ1 12 40.375 Span 2 Interior Girder 3 5 Before Str I-DL 24 Combination 2.42 -25.896 1.875 1.5688 -2.2607 -94.0528 40.375 -3.5 -1.0208BOBJ1 13 40.375 Span 2 Interior Girder 3 5 After Str I-DL 24 Combination 1.664 -25 2.062 1.8304 3.6498 -93.512 40.375 -3.5 -1.0208BOBJ1 14 48.2813 Span 2 Interior Girder 3 12.9063 Before Str I-DL 24 Combination 0.602 -13.246 2.135 2.1065 -5.1607 58.4396 48.2813 -3.5 -1.0208BOBJ1 15 48.2813 Span 2 Interior Girder 3 12.9063 After Str I-DL 24 Combination -0.485 -12.128 2.062 2.097 3.026 59.2182 48.2813 -3.5 -1.0208BOBJ1 16 56.1875 Span 2 Interior Girder 3 20.8125 Before Str I-DL 24 Combination -1.2 -0.347 1.307 1.6676 -3.3572 109.0437 56.1875 -3.5 -1.0208BOBJ1 17 56.1875 Span 2 Interior Girder 3 20.8125 After Str I-DL 24 Combination -1.157 3.484 -0.051 0.0857 -0.7454 109.1508 56.1875 -3.5 -1.0208BOBJ1 18 64.0938 Span 2 Interior Girder 3 28.7188 Before Str I-DL 24 Combination -0.413 15.309 -0.754 -0.387 1.0065 34.3283 64.0938 -3.5 -1.0208BOBJ1 19 64.0938 Span 2 Interior Girder 3 28.7188 After Str I-DL 24 Combination 0.69 16.515 -0.719 -0.4271 -1.4423 33.5398 64.0938 -3.5 -1.0208BOBJ1 20 72 Span 2 Interior Girder 3 36.625 Before Str I-DL 24 Combination 1.852 28.395 -0.482 -0.15 1.8241 -144.825 72 -3.5 -1.0208BOBJ1 21 72 Span 2 Interior Girder 3 36.625 After Str I-DL 24 Combination 3.047 29.414 -0.086 0.171 1.6811 -145.678 72 -3.5 -1.0208

Page 79 ends

BOBJ1 22 77 Span 2 Interior Girder 3 41.625 Before Str I-DL 24 Combination 3.911 37.615 0.127 0.5646 2.4644 -313.743 77 -3.5 -1.1368 BOBJ1 23 77 Span 3 Interior Girder 3 0 After Str I-DL 24 Combination 4.116 -40.543 3.076 2.3064 6.1847 -314.694 77 -3.5 -1.1368BOBJ1 24 82 Span 3 Interior Girder 3 5 Before Str I-DL 24 Combination 4.095 -32.493 3.238 2.3572 -3.2224 -132.198 82 -3.5 -1.0208BOBJ1 25 82 Span 3 Interior Girder 3 5 After Str I-DL 24 Combination 3.615 -31.803 3.643 2.7891 5.7681 -131.852 82 -3.5 -1.0208BOBJ1 26 92 Span 3 Interior Girder 3 15 Before Str I-DL 24 Combination 0.305 -16.679 4.229 3.5172 -8.9443 112.9913 92 -3.5 -1.0208BOBJ1 27 92 Span 3 Interior Girder 3 15 After Str I-DL 24 Combination -1.742 -15.788 4.211 3.4998 4.6715 114.4569 92 -3.5 -1.0208BOBJ1 28 102 Span 3 Interior Girder 3 25 Before Str I-DL 24 Combination -4.351 -0.429 2.814 2.5172 -7.2882 197.4554 102 -3.5 -1.0208BOBJ1 29 102 Span 3 Interior Girder 3 25 After Str I-DL 24 Combination -4.188 2.875 0.518 0.1562 -1.7217 197.4234 102 -3.5 -1.0208BOBJ1 30 112 Span 3 Interior Girder 3 35 Before Str I-DL 24 Combination -1.035 18.276 -0.842 -0.8559 -0.7313 89.3901 112 -3.5 -1.0208BOBJ1 31 112 Span 3 Interior Girder 3 35 After Str I-DL 24 Combination 1.181 19.211 -0.815 -0.8881 -2.9531 87.8044 112 -3.5 -1.0208BOBJ1 32 122 Span 3 Interior Girder 3 45 Before Str I-DL 24 Combination 4.735 34.471 -0.149 -0.251 0.3985 -183.183 122 -3.5 -1.0208BOBJ1 33 122 Span 3 Interior Girder 3 45 After Str I-DL 24 Combination 5.568 35.236 0.197 0.0272 1.4795 -183.781 122 -3.5 -1.0208BOBJ1 34 127 Span 3 Interior Girder 3 50 Before Str I-DL 24 Combination 5.944 43.335 0.141 0.2175 1.874 -380.583 127 -3.5 -1.1368BOBJ1 35 127 Span 4 Interior Girder 3 0 After Str I-DL 24 Combination 5.93 -42.902 0.2 0.1686 2.2581 -380.308 127 -3.5 -1.1368BOBJ1 36 132 Span 4 Interior Girder 3 5 Before Str I-DL 24 Combination 5.41 -34.757 0.107 0.3065 0.9421 -185.682 132 -3.5 -1.0208BOBJ1 37 132 Span 4 Interior Girder 3 5 After Str I-DL 24 Combination 4.486 -33.922 0.427 0.5912 0.6646 -185.022 132 -3.5 -1.0208BOBJ1 38 142 Span 4 Interior Girder 3 15 Before Str I-DL 24 Combination 1.347 -18.538 1.086 1.2817 -3.4892 79.5326 142 -3.5 -1.0208BOBJ1 39 142 Span 4 Interior Girder 3 15 After Str I-DL 24 Combination -0.592 -17.568 1.111 1.2739 -0.3058 80.9205 142 -3.5 -1.0208BOBJ1 40 152 Span 4 Interior Girder 3 25 Before Str I-DL 24 Combination -3.442 -2.138 -0.25 0.2979 -2.0432 181.4869 152 -3.5 -1.0208BOBJ1 41 152 Span 4 Interior Girder 3 25 After Str I-DL 24 Combination -3.504 1.54 -2.615 -2.1141 -6.7873 181.4882 152 -3.5 -1.0208BOBJ1 42 162 Span 4 Interior Girder 3 35 Before Str I-DL 24 Combination -0.857 16.947 -3.948 -3.0896 4.591 87.1434 162 -3.5 -1.0208BOBJ1 43 162 Span 4 Interior Girder 3 35 After Str I-DL 24 Combination 1.022 17.896 -3.895 -3.082 -7.9563 85.7984 162 -3.5 -1.0208BOBJ1 44 172 Span 4 Interior Girder 3 45 Before Str I-DL 24 Combination 4.076 33.212 -3.124 -2.2787 5.4805 -171.947 172 -3.5 -1.0208BOBJ1 45 172 Span 4 Interior Girder 3 45 After Str I-DL 24 Combination 4.876 34.012 -2.629 -1.8088 -1.9364 -172.52 172 -3.5 -1.0208BOBJ1 46 177 Span 4 Interior Girder 3 50 Before Str I-DL 24 Combination 5.273 42.133 -2.395 -1.6375 5.6482 -363.196 177 -3.5 -1.1368BOBJ1 47 177 Span 5 Interior Girder 3 0 After Str I-DL 24 Combination 5.217 -42.106 0.567 0.2403 3.4418 -363.152 177 -3.5 -1.1368BOBJ1 48 182 Span 5 Interior Girder 3 5 Before Str I-DL 24 Combination 4.703 -33.985 0.754 0.5816 0.6428 -172.533 182 -3.5 -1.0208BOBJ1 49 182 Span 5 Interior Girder 3 5 After Str I-DL 24 Combination 3.774 -33.186 1.177 0.9865 2.4825 -171.869 182 -3.5 -1.0208BOBJ1 50 192 Span 5 Interior Girder 3 15 Before Str I-DL 24 Combination 0.481 -17.872 1.867 1.739 -4.2416 85.7952 192 -3.5 -1.0208BOBJ1 51 192 Span 5 Interior Girder 3 15 After Str I-DL 24 Combination -1.506 -16.925 1.892 1.7349 1.5489 87.2172 192 -3.5 -1.0208BOBJ1 52 202 Span 5 Interior Girder 3 25 Before Str I-DL 24 Combination -4.361 -1.518 0.54 0.7636 -2.8219 181.4883 202 -3.5 -1.0208BOBJ1 53 202 Span 5 Interior Girder 3 25 After Str I-DL 24 Combination -4.403 2.156 -1.861 -1.6584 -4.9858 181.5554 202 -3.5 -1.0208BOBJ1 54 212 Span 5 Interior Girder 3 35 Before Str I-DL 24 Combination -1.754 17.587 -3.174 -2.6102 3.8561 80.9442 212 -3.5 -1.0208BOBJ1 55 212 Span 5 Interior Girder 3 35 After Str I-DL 24 Combination 0.096 18.558 -3.112 -2.593 -6.0892 79.6198 212 -3.5 -1.0208BOBJ1 56 222 Span 5 Interior Girder 3 45 Before Str I-DL 24 Combination 3.098 33.945 -2.314 -1.778 4.6816 -185.052 222 -3.5 -1.0208BOBJ1 57 222 Span 5 Interior Girder 3 45 After Str I-DL 24 Combination 3.982 34.782 -1.831 -1.3365 -0.365 -185.684 222 -3.5 -1.0208BOBJ1 58 227 Span 5 Interior Girder 3 50 Before Str I-DL 24 Combination 4.473 42.927 -1.666 -1.1485 5.1861 -380.245 227 -3.5 -1.1368BOBJ1 59 227 Span 6 Interior Girder 3 0 After Str I-DL 24 Combination 4.458 -43.333 0.247 0.0282 3.4752 -380.507 227 -3.5 -1.1368BOBJ1 60 232 Span 6 Interior Girder 3 5 Before Str I-DL 24 Combination 4.053 -35.235 0.389 0.3558 1.6378 -183.864 232 -3.5 -1.0208BOBJ1 61 232 Span 6 Interior Girder 3 5 After Str I-DL 24 Combination 3.19 -34.471 0.831 0.7522 2.4169 -183.245 232 -3.5 -1.0208BOBJ1 62 242 Span 6 Interior Girder 3 15 Before Str I-DL 24 Combination -0.396 -19.216 1.585 1.5237 -3.3386 87.7939 242 -3.5 -1.0208BOBJ1 63 242 Span 6 Interior Girder 3 15 After Str I-DL 24 Combination -2.602 -18.282 1.628 1.5256 1.4794 89.3723 242 -3.5 -1.0208BOBJ1 64 252 Span 6 Interior Girder 3 25 Before Str I-DL 24 Combination -5.699 -2.882 0.305 0.5679 -2.201 197.4347 252 -3.5 -1.0208BOBJ1 65 252 Span 6 Interior Girder 3 25 After Str I-DL 24 Combination -5.83 0.413 -2.068 -1.8274 -5.1723 197.445 252 -3.5 -1.0208BOBJ1 66 262 Span 6 Interior Girder 3 35 Before Str I-DL 24 Combination -3.166 15.773 -3.447 -2.8205 4.3152 114.5648 262 -3.5 -1.0208BOBJ1 67 262 Span 6 Interior Girder 3 35 After Str I-DL 24 Combination -1.096 16.665 -3.47 -2.859 -6.7518 113.083 262 -3.5 -1.0208BOBJ1 68 272 Span 6 Interior Girder 3 45 Before Str I-DL 24 Combination 2.286 31.798 -2.889 -2.1771 5.4219 -131.717 272 -3.5 -1.0208BOBJ1 69 272 Span 6 Interior Girder 3 45 After Str I-DL 24 Combination 2.849 32.494 -2.448 -1.7423 -1.4329 -132.123 272 -3.5 -1.0208BOBJ1 70 277 Span 6 Interior Girder 3 50 Before Str I-DL 24 Combination 2.957 40.547 -2.223 -1.5628 5.665 -314.561 277 -3.5 -1.1368BOBJ1 71 277 Span 7 Interior Girder 3 0 After Str I-DL 24 Combination 2.816 -37.612 0.534 0.1638 3.6891 -313.703 277 -3.5 -1.1368

Page 80 ends

BOBJ1 72 282 Span 7 Interior Girder 3 5 Before Str I-DL 24 Combination 2.016 -29.415 0.731 0.4921 1.1453 -145.815 282 -3.5 -1.0208 BOBJ1 73 282 Span 7 Interior Girder 3 5 After Str I-DL 24 Combination 0.886 -28.404 1.127 0.8604 3.3387 -145.009 282 -3.5 -1.0208BOBJ1 74 289.9063 Span 7 Interior Girder 3 12.9063 Before Str I-DL 24 Combination -0.24 -16.533 1.377 1.2025 -2.4117 33.439 289.9063 -3.5 -1.0208BOBJ1 75 289.9063 Span 7 Interior Girder 3 12.9063 After Str I-DL 24 Combination -1.335 -15.335 1.425 1.2222 2.7484 34.2226 289.9063 -3.5 -1.0208BOBJ1 76 297.8125 Span 7 Interior Girder 3 20.8125 Before Str I-DL 24 Combination -2.133 -3.515 0.738 0.7985 -1.5863 109.3104 297.8125 -3.5 -1.0208BOBJ1 77 297.8125 Span 7 Interior Girder 3 20.8125 After Str I-DL 24 Combination -2.251 0.445 -0.676 -0.7938 -1.5552 109.3225 297.8125 -3.5 -1.0208BOBJ1 78 305.7188 Span 7 Interior Girder 3 28.7188 Before Str I-DL 24 Combination -1.646 12.245 -1.431 -1.2554 2.485 58.7281 305.7188 -3.5 -1.0208BOBJ1 79 305.7188 Span 7 Interior Girder 3 28.7188 After Str I-DL 24 Combination -0.703 13.402 -1.512 -1.3074 -3.0962 58.0531 305.7188 -3.5 -1.0208BOBJ1 80 313.625 Span 7 Interior Girder 3 36.625 Before Str I-DL 24 Combination 0.276 25.212 -1.418 -1.041 3.4294 -95.2939 313.625 -3.5 -1.0208BOBJ1 81 313.625 Span 7 Interior Girder 3 36.625 After Str I-DL 24 Combination 1.133 26.163 -1.048 -0.6474 0.1119 -95.9059 313.625 -3.5 -1.0208BOBJ1 82 318.625 Span 7 Interior Girder 3 41.625 Before Str I-DL 24 Combination 1.632 34.321 -0.632 -0.1274 3.0517 -247.082 318.625 -3.5 -1.1368BOBJ1 83 318.625 Span 8 Interior Girder 3 0 After Str I-DL 24 Combination 1.739 -36.059 1.462 0.4091 4.0772 -247.176 318.625 -3.5 -1.1368BOBJ1 84 323.625 Span 8 Interior Girder 3 5 Before Str I-DL 24 Combination 1.453 -27.961 1.868 0.8136 -0.9651 -87.305 323.625 -3.5 -1.0208BOBJ1 85 323.625 Span 8 Interior Girder 3 5 After Str I-DL 24 Combination 0.988 -27.266 2.139 1.107 3.7042 -86.9707 323.625 -3.5 -1.0208BOBJ1 86 332.0833 Span 8 Interior Girder 3 13.4583 Before Str I-DL 24 Combination -0.407 -14.39 2.136 1.354 -3.5832 90.2114 332.0833 -3.5 -1.0208BOBJ1 87 332.0833 Span 8 Interior Girder 3 13.4583 After Str I-DL 24 Combination -1.148 -13.635 2.023 1.3052 1.94 90.7423 332.0833 -3.5 -1.0208BOBJ1 88 340.5417 Span 8 Interior Girder 3 21.9167 Before Str I-DL 24 Combination -2.162 -0.69 1.256 0.9058 -3.152 152.0671 340.5417 -3.5 -1.0208BOBJ1 89 340.5417 Span 8 Interior Girder 3 21.9167 After Str I-DL 24 Combination -2.295 0.107 0.894 0.6505 -0.2523 152.1623 340.5417 -3.5 -1.0208BOBJ1 90 349 Span 8 Interior Girder 3 30.375 Before Str I-DL 24 Combination -1.72 13.13 0.073 0.1898 -1.454 95.7869 349 -3.5 -1.0208BOBJ1 91 349 Span 8 Interior Girder 3 30.375 After Str I-DL 24 Combination -1.032 13.904 -0.297 -0.0927 -1.1675 95.2945 349 -3.5 -1.0208BOBJ1 92 354 Span 8 Interior Girder 3 35.375 Before Str I-DL 24 Combination -0.181 21.372 -0.964 -0.4865 2.2649 6.4957 354 -3.5 -1.0208BOBJ1 1 0 Span 1 Interior Girder 4 0 After Str I-DL 24 Combination 0.526 -20.991 4.007 3.2187 3.934 10.5751 -8.88E-16 -1.05E+01 -1.1258BOBJ1 2 5 Span 1 Interior Girder 4 5 Before Str I-DL 24 Combination -0.75 -13.605 3.579 3.0983 -5.394 97.9783 5.00E+00 -1.05E+01 -1.1258BOBJ1 3 5 Span 1 Interior Girder 4 5 After Str I-DL 24 Combination -2.188 -12.889 3.153 2.7147 4.3953 99.0136 5 -10.5 -1.1258BOBJ1 4 13.4583 Span 1 Interior Girder 4 13.4583 Before Str I-DL 24 Combination -4.365 0.121 0.809 0.5501 -0.3981 154.6174 13.4583 -10.5 -1.1258BOBJ1 5 13.4583 Span 1 Interior Girder 4 13.4583 After Str I-DL 24 Combination -4.646 0.992 -0.585 -0.9396 0.069 154.8247 13.4583 -10.5 -1.1258BOBJ1 6 21.9167 Span 1 Interior Girder 4 21.9167 Before Str I-DL 24 Combination -3.299 14.133 -3.307 -3.5931 5.3822 89.8957 21.9167 -10.5 -1.1258BOBJ1 7 21.9167 Span 1 Interior Girder 4 21.9167 After Str I-DL 24 Combination -1.765 15.004 -3.948 -4.3941 -5.2688 88.7975 21.9167 -10.5 -1.1258BOBJ1 8 30.375 Span 1 Interior Girder 4 30.375 Before Str I-DL 24 Combination 2.082 28.027 -3.643 -4.1942 3.5206 -95.9901 30.375 -10.5 -1.1258BOBJ1 9 30.375 Span 1 Interior Girder 4 30.375 After Str I-DL 24 Combination 3.5 28.753 -2.9 -3.5564 -6.3891 -97.0113 30.375 -10.5 -1.1258BOBJ1 10 35.375 Span 1 Interior Girder 4 35.375 Before Str I-DL 24 Combination 4.172 36.813 -2.864 -3.3742 2.3862 -261.319 35.375 -10.5 -1.2418BOBJ1 11 35.375 Span 2 Interior Girder 4 0 After Str I-DL 24 Combination 3.337 -34.953 2.554 3.0942 2.2018 -256.202 35.375 -10.5 -1.2418BOBJ1 12 40.375 Span 2 Interior Girder 4 5 Before Str I-DL 24 Combination 3.203 -26.876 2.745 3.3862 -5.8328 -101.718 40.375 -10.5 -1.1258BOBJ1 13 40.375 Span 2 Interior Girder 4 5 After Str I-DL 24 Combination 2.144 -25.979 3.81 4.2551 6.4992 -100.955 40.375 -10.5 -1.1258BOBJ1 14 48.2813 Span 2 Interior Girder 4 12.9063 Before Str I-DL 24 Combination 0.556 -14.227 4.337 4.8009 -8.6196 59.117 48.2813 -10.5 -1.1258BOBJ1 15 48.2813 Span 2 Interior Girder 4 12.9063 After Str I-DL 24 Combination -0.732 -13.101 3.912 4.3639 7.873 60.0367 48.2813 -10.5 -1.1258BOBJ1 16 56.1875 Span 2 Interior Girder 4 20.8125 Before Str I-DL 24 Combination -1.587 -1.348 2.308 3.259 -4.2958 117.7648 56.1875 -10.5 -1.1258BOBJ1 17 56.1875 Span 2 Interior Girder 4 20.8125 After Str I-DL 24 Combination -1.269 3.97 -1.716 -1.6624 -2.9374 117.5079 56.1875 -10.5 -1.1258BOBJ1 18 64.0938 Span 2 Interior Girder 4 28.7188 Before Str I-DL 24 Combination 0.225 15.713 -3.204 -2.8594 7.2725 38.6314 64.0938 -10.5 -1.1258BOBJ1 19 64.0938 Span 2 Interior Girder 4 28.7188 After Str I-DL 24 Combination 2.044 16.817 -3.379 -3.4153 -5.3805 37.3313 64.0938 -10.5 -1.1258BOBJ1 20 72 Span 2 Interior Girder 4 36.625 Before Str I-DL 24 Combination 3.895 28.535 -2.458 -2.9886 5.6472 -143.274 72 -10.5 -1.1258BOBJ1 21 72 Span 2 Interior Girder 4 36.625 After Str I-DL 24 Combination 4.702 29.393 -0.94 -2.1489 -1.5807 -143.859 72 -10.5 -1.1258BOBJ1 22 77 Span 2 Interior Girder 4 41.625 Before Str I-DL 24 Combination 4.556 37.451 -0.398 -1.5806 0.0494 -310.818 77 -10.5 -1.2418BOBJ1 23 77 Span 3 Interior Girder 4 0 After Str I-DL 24 Combination 6.766 -42.56 4.205 4.3512 5.5618 -339.912 77 -10.5 -1.2418BOBJ1 24 82 Span 3 Interior Girder 4 5 Before Str I-DL 24 Combination 6.24 -34.437 4.477 4.6435 -7.8881 -146.826 82 -10.5 -1.1258BOBJ1 25 82 Span 3 Interior Girder 4 5 After Str I-DL 24 Combination 4.748 -33.555 6.042 6.0209 8.0956 -145.759 82 -10.5 -1.1258BOBJ1 26 92 Span 3 Interior Girder 4 15 Before Str I-DL 24 Combination 1.208 -18.083 7.781 7.5698 -13.6303 114.9621 92 -10.5 -1.1258BOBJ1 27 92 Span 3 Interior Girder 4 15 After Str I-DL 24 Combination 0.03 -17.075 7.327 6.996 11.2778 115.7958 92 -10.5 -1.1258BOBJ1 28 102 Span 3 Interior Girder 4 25 Before Str I-DL 24 Combination -1.067 -1.722 3.756 4.2359 -8.1421 210.538 102 -10.5 -1.1258BOBJ1 29 102 Span 3 Interior Girder 4 25 After Str I-DL 24 Combination -0.701 3.948 -1.556 -2.0821 -4.4335 210.309 102 -10.5 -1.1258

Page 81 ends

BOBJ1 30 112 Span 3 Interior Girder 4 35 Before Str I-DL 24 Combination 1.932 19.301 -4.951 -4.8752 7.669 92.2502 112 -10.5 -1.1258 BOBJ1 31 112 Span 3 Interior Girder 4 35 After Str I-DL 24 Combination 3.775 20.305 -5.183 -5.4422 -8.764 90.9258 112 -10.5 -1.1258BOBJ1 32 122 Span 3 Interior Girder 4 45 Before Str I-DL 24 Combination 8.15 35.742 -2.767 -3.8418 3.3081 -192.421 122 -10.5 -1.1258BOBJ1 33 122 Span 3 Interior Girder 4 45 After Str I-DL 24 Combination 9.398 36.597 -0.78 -2.4147 -3.0033 -193.322 122 -10.5 -1.1258BOBJ1 34 127 Span 3 Interior Girder 4 50 Before Str I-DL 24 Combination 9.566 44.692 -0.129 -1.5198 -1.4156 -397.206 127 -10.5 -1.2418BOBJ1 35 127 Span 4 Interior Girder 4 0 After Str I-DL 24 Combination 10.116 -43.666 0.287 2.165 -1.4364 -391.044 127 -10.5 -1.2418BOBJ1 36 132 Span 4 Interior Girder 4 5 Before Str I-DL 24 Combination 10.087 -35.588 0.992 2.9966 -3.217 -192.284 132 -10.5 -1.1258BOBJ1 37 132 Span 4 Interior Girder 4 5 After Str I-DL 24 Combination 8.954 -34.762 2.942 4.2932 3.8076 -191.471 132 -10.5 -1.1258BOBJ1 38 142 Span 4 Interior Girder 4 15 Before Str I-DL 24 Combination 4.609 -19.375 5.24 5.6798 -8.8585 82.3479 142 -10.5 -1.1258BOBJ1 39 142 Span 4 Interior Girder 4 15 After Str I-DL 24 Combination 2.704 -18.388 5.006 5.1008 7.7723 83.7018 142 -10.5 -1.1258BOBJ1 40 152 Span 4 Interior Girder 4 25 Before Str I-DL 24 Combination 0.132 -3.046 1.823 2.4684 -4.9568 192.6945 152 -10.5 -1.1258BOBJ1 41 152 Span 4 Interior Girder 4 25 After Str I-DL 24 Combination -0.139 2.555 -4.004 -3.9818 -8.5536 192.9106 152 -10.5 -1.1258BOBJ1 42 162 Span 4 Interior Girder 4 35 Before Str I-DL 24 Combination 1.441 17.898 -7.222 -6.6023 11.617 89.5698 162 -10.5 -1.1258BOBJ1 43 162 Span 4 Interior Girder 4 35 After Str I-DL 24 Combination 2.832 18.887 -7.5 -7.1722 -12.3794 88.5685 162 -10.5 -1.1258BOBJ1 44 172 Span 4 Interior Girder 4 45 Before Str I-DL 24 Combination 6.519 34.276 -5.355 -5.7031 8.0768 -179.876 172 -10.5 -1.1258BOBJ1 45 172 Span 4 Interior Girder 4 45 After Str I-DL 24 Combination 7.603 35.108 -3.516 -4.3401 -6.0367 -180.661 172 -10.5 -1.1258BOBJ1 46 177 Span 4 Interior Girder 4 50 Before Str I-DL 24 Combination 7.687 43.192 -2.984 -3.8436 3.5222 -376.793 177 -10.5 -1.2418BOBJ1 47 177 Span 5 Interior Girder 4 0 After Str I-DL 24 Combination 6.643 -43.187 1.246 2.6242 0.8225 -376.827 177 -10.5 -1.2418BOBJ1 48 182 Span 5 Interior Girder 4 5 Before Str I-DL 24 Combination 6.467 -35.095 1.843 3.3333 -3.9581 -180.795 182 -10.5 -1.1258BOBJ1 49 182 Span 5 Interior Girder 4 5 After Str I-DL 24 Combination 5.244 -34.251 3.727 4.6759 5.5162 -179.919 182 -10.5 -1.1258BOBJ1 50 192 Span 5 Interior Girder 4 15 Before Str I-DL 24 Combination 1.132 -18.834 5.886 6.0989 -9.4541 88.4676 192 -10.5 -1.1258BOBJ1 51 192 Span 5 Interior Girder 4 15 After Str I-DL 24 Combination -0.578 -17.839 5.598 5.5209 9.2662 89.6811 192 -10.5 -1.1258BOBJ1 52 202 Span 5 Interior Girder 4 25 Before Str I-DL 24 Combination -2.746 -2.49 2.38 2.8992 -5.3491 192.855 202 -10.5 -1.1258BOBJ1 53 202 Span 5 Interior Girder 4 25 After Str I-DL 24 Combination -2.827 3.107 -3.46 -3.5566 -7.0912 192.9253 202 -10.5 -1.1258BOBJ1 54 212 Span 5 Interior Girder 4 35 Before Str I-DL 24 Combination -0.872 18.445 -6.638 -6.1833 11.2434 83.8198 212 -10.5 -1.1258BOBJ1 55 212 Span 5 Interior Girder 4 35 After Str I-DL 24 Combination 0.708 19.427 -6.876 -6.7632 -10.7102 82.6831 212 -10.5 -1.1258BOBJ1 56 222 Span 5 Interior Girder 4 45 Before Str I-DL 24 Combination 4.645 34.793 -4.619 -5.3475 7.571 -191.227 222 -10.5 -1.1258BOBJ1 57 222 Span 5 Interior Girder 4 45 After Str I-DL 24 Combination 5.693 35.61 -2.692 -4.0069 -4.3409 -191.986 222 -10.5 -1.1258BOBJ1 58 227 Span 5 Interior Girder 4 50 Before Str I-DL 24 Combination 5.718 43.682 -2.03 -3.3616 2.4135 -390.326 227 -10.5 -1.2418BOBJ1 59 227 Span 6 Interior Girder 4 0 After Str I-DL 24 Combination 4.525 -44.791 0.744 2.0897 0.588 -397.73 227 -10.5 -1.2418BOBJ1 60 232 Span 6 Interior Girder 4 5 Before Str I-DL 24 Combination 4.322 -36.685 1.435 2.9481 -2.9656 -193.94 232 -10.5 -1.1258BOBJ1 61 232 Span 6 Interior Girder 4 5 After Str I-DL 24 Combination 3.042 -35.817 3.457 4.4058 5.4237 -193.024 232 -10.5 -1.1258BOBJ1 62 242 Span 6 Interior Girder 4 15 Before Str I-DL 24 Combination -1.159 -20.353 5.869 6.0197 -9.0105 90.8353 242 -10.5 -1.1258BOBJ1 63 242 Span 6 Interior Girder 4 15 After Str I-DL 24 Combination -2.926 -19.345 5.615 5.4569 9.7066 92.0898 242 -10.5 -1.1258BOBJ1 64 252 Span 6 Interior Girder 4 25 Before Str I-DL 24 Combination -5.277 -3.988 2.217 2.6794 -4.6355 210.4033 252 -10.5 -1.1258BOBJ1 65 252 Span 6 Interior Girder 4 25 After Str I-DL 24 Combination -5.554 1.67 -3.123 -3.6527 -6.2081 210.6263 252 -10.5 -1.1258BOBJ1 66 262 Span 6 Interior Girder 4 35 Before Str I-DL 24 Combination -4.224 17.021 -6.673 -6.4161 11.0488 116.2931 262 -10.5 -1.1258BOBJ1 67 262 Span 6 Interior Girder 4 35 After Str I-DL 24 Combination -2.979 18.025 -7.12 -7.0053 -11.6345 115.3961 262 -10.5 -1.1258BOBJ1 68 272 Span 6 Interior Girder 4 45 Before Str I-DL 24 Combination 0.758 33.474 -5.433 -5.5106 7.9335 -144.746 272 -10.5 -1.1258BOBJ1 69 272 Span 6 Interior Girder 4 45 After Str I-DL 24 Combination 2.295 34.344 -3.883 -4.1458 -6.371 -145.853 272 -10.5 -1.1258BOBJ1 70 277 Span 6 Interior Girder 4 50 Before Str I-DL 24 Combination 2.907 42.458 -3.592 -3.7658 5.2527 -338.063 277 -10.5 -1.2418BOBJ1 71 277 Span 7 Interior Girder 4 0 After Str I-DL 24 Combination 1.522 -37.592 1.019 2.265 1.3475 -313.179 277 -10.5 -1.2418BOBJ1 72 282 Span 7 Interior Girder 4 5 Before Str I-DL 24 Combination 1.66 -29.532 1.541 2.7814 -2.0268 -145.863 282 -10.5 -1.1258BOBJ1 73 282 Span 7 Interior Girder 4 5 After Str I-DL 24 Combination 0.844 -28.671 3.042 3.6691 7.0551 -145.272 282 -10.5 -1.1258BOBJ1 74 289.9063 Span 7 Interior Girder 4 12.9063 Before Str I-DL 24 Combination -0.965 -16.947 3.964 4.1662 -6.2004 36.3548 289.9063 -10.5 -1.1258BOBJ1 75 289.9063 Span 7 Interior Girder 4 12.9063 After Str I-DL 24 Combination -2.706 -15.838 3.806 3.6832 8.8653 37.5987 289.9063 -10.5 -1.1258BOBJ1 76 297.8125 Span 7 Interior Girder 4 20.8125 Before Str I-DL 24 Combination -4.077 -4.091 2.368 2.5637 -3.7517 117.3604 297.8125 -10.5 -1.1258BOBJ1 77 297.8125 Span 7 Interior Girder 4 20.8125 After Str I-DL 24 Combination -4.257 1.162 -1.743 -2.4051 -2.6901 117.4925 297.8125 -10.5 -1.1258BOBJ1 78 305.7188 Span 7 Interior Girder 4 28.7188 Before Str I-DL 24 Combination -3.245 12.906 -3.31 -3.5456 7.3496 61.1591 305.7188 -10.5 -1.1258BOBJ1 79 305.7188 Span 7 Interior Girder 4 28.7188 After Str I-DL 24 Combination -1.784 14.012 -3.744 -4.092 -6.6345 60.1151 305.7188 -10.5 -1.1258

Page 82 ends

BOBJ1 80 313.625 Span 7 Interior Girder 4 36.625 Before Str I-DL 24 Combination -0.03 25.737 -3.231 -3.6873 6.285 -98.2721 313.625 -10.5 -1.1258 BOBJ1 81 313.625 Span 7 Interior Girder 4 36.625 After Str I-DL 24 Combination 1.144 26.61 -2.18 -2.9403 -4.21 -99.1164 313.625 -10.5 -1.1258BOBJ1 82 318.625 Span 7 Interior Girder 4 41.625 Before Str I-DL 24 Combination 1.388 34.677 -2.094 -2.7269 2.562 -252.099 318.625 -10.5 -1.2418BOBJ1 83 318.625 Span 8 Interior Girder 4 0 After Str I-DL 24 Combination 2.749 -36.824 3.763 3.4236 5.0347 -257.921 318.625 -10.5 -1.2418BOBJ1 84 323.625 Span 8 Interior Girder 4 5 Before Str I-DL 24 Combination 1.964 -28.737 3.668 3.4351 -6.5266 -93.712 323.625 -10.5 -1.1258BOBJ1 85 323.625 Span 8 Interior Girder 4 5 After Str I-DL 24 Combination 0.433 -27.981 4.402 4.0997 5.2125 -92.6166 323.625 -10.5 -1.1258BOBJ1 86 332.0833 Span 8 Interior Girder 4 13.4583 Before Str I-DL 24 Combination -3.19 -14.915 4.786 4.3672 -5.9236 91.4298 332.0833 -10.5 -1.1258BOBJ1 87 332.0833 Span 8 Interior Girder 4 13.4583 After Str I-DL 24 Combination -4.57 -14.033 4.156 3.5742 7.0415 92.4127 332.0833 -10.5 -1.1258BOBJ1 88 340.5417 Span 8 Interior Girder 4 21.9167 Before Str I-DL 24 Combination -5.593 -0.883 1.436 0.9259 -0.8773 156.2294 340.5417 -10.5 -1.1258BOBJ1 89 340.5417 Span 8 Interior Girder 4 21.9167 After Str I-DL 24 Combination -5.166 -0.00412 0.054 -0.5624 0.9963 155.9178 340.5417 -10.5 -1.1258BOBJ1 90 349 Span 8 Interior Girder 4 30.375 Before Str I-DL 24 Combination -2.715 13.017 -2.28 -2.726 3.1931 99.0821 349 -10.5 -1.1258BOBJ1 91 349 Span 8 Interior Girder 4 30.375 After Str I-DL 24 Combination -1.171 13.733 -2.629 -3.0576 -4.3869 97.9713 349 -10.5 -1.1258BOBJ1 92 354 Span 8 Interior Girder 4 35.375 Before Str I-DL 24 Combination 0.265 21.116 -2.824 -3.0069 1.4174 9.8173 354 -10.5 -1.1258BOBJ1 1 0 Span 1 Right Exterior Girder 0 After Str I-DL 24 Combination -0.196 -26.285 3.698 11.2675 -3.9278 -4.4029 -1.18E-15 -1.75E+01 -1.2308BOBJ1 2 5 Span 1 Right Exterior Girder 5 Before Str I-DL 24 Combination 1.81 -16.683 5.05 9.6347 -19.2406 101.579 5 -17.5 -1.2308BOBJ1 3 5 Span 1 Right Exterior Girder 5 After Str I-DL 24 Combination 3.921 -16.326 4.629 9.5724 -12.3456 100.0622 5 -17.5 -1.2308BOBJ1 4 13.4583 Span 1 Right Exterior Girder 13.4583 Before Str I-DL 24 Combination 6.788 -0.023 1.303 2.1115 -28.5542 167.117 13.4583 -17.5 -1.2308BOBJ1 5 13.4583 Span 1 Right Exterior Girder 13.4583 After Str I-DL 24 Combination 6.994 0.257 -0.746 0.6078 -27.8209 166.9627 13.4583 -17.5 -1.2308BOBJ1 6 21.9167 Span 1 Right Exterior Girder 21.9167 Before Str I-DL 24 Combination 4.682 16.472 -4.904 -7.6063 -11.2667 97.8775 21.9167 -17.5 -1.2308BOBJ1 7 21.9167 Span 1 Right Exterior Girder 21.9167 After Str I-DL 24 Combination 2.396 16.772 -6.46 -8.6475 -18.7445 99.5141 21.9167 -17.5 -1.2308BOBJ1 8 30.375 Span 1 Right Exterior Girder 30.375 Before Str I-DL 24 Combination -2.97 33.127 -6.894 -13.6747 22.3871 -107.629 30.375 -17.5 -1.2308BOBJ1 9 30.375 Span 1 Right Exterior Girder 30.375 After Str I-DL 24 Combination -5.081 33.504 -3.984 -11.1775 15.8953 -106.111 30.375 -17.5 -1.2308BOBJ1 10 35.375 Span 1 Right Exterior Girder 35.3766 Before Str I-DL 24 Combination -6.221 43.509 2.099 -14.2441 17.708 -296.806 35.375 -17.375 -1.3449BOBJ1 11 35.375 Span 2 Right Exterior Girder 0 After Str I-DL 24 Combination -4.86 -40.299 -2.359 11.5219 18.0882 -279.971 35.375 -17.375 -1.3449BOBJ1 12 40.375 Span 2 Right Exterior Girder 5.0016 Before Str I-DL 24 Combination -4.056 -30.311 3.378 8.5614 17.3781 -104.887 40.375 -17.5 -1.2308BOBJ1 13 40.375 Span 2 Right Exterior Girder 5.0016 After Str I-DL 24 Combination -1.775 -29.872 6.152 10.928 24.5303 -106.524 40.375 -17.5 -1.2308BOBJ1 14 48.2813 Span 2 Right Exterior Girder 12.9078 Before Str I-DL 24 Combination 1.455 -14.731 6.124 6.3158 -13.424 67.4865 48.2813 -17.5 -1.2308BOBJ1 15 48.2813 Span 2 Right Exterior Girder 12.9078 After Str I-DL 24 Combination 4.455 -14.245 4.695 5.3947 -3.4305 65.3415 48.2813 -17.5 -1.2308BOBJ1 16 56.1875 Span 2 Right Exterior Girder 20.8141 Before Str I-DL 24 Combination 6.657 0.862 2.783 -0.6811 -25.493 116.6753 56.1875 -17.5 -1.2308BOBJ1 17 56.1875 Span 2 Right Exterior Girder 20.8141 After Str I-DL 24 Combination 6.689 1.348 -3.238 1.0924 -25.2852 116.4458 56.1875 -17.5 -1.2308BOBJ1 18 64.0938 Span 2 Right Exterior Girder 28.7203 Before Str I-DL 24 Combination 4.619 16.433 -5.076 -5.0136 0.643 47.6311 64.0938 -17.5 -1.2308BOBJ1 19 64.0938 Span 2 Right Exterior Girder 28.7203 After Str I-DL 24 Combination 1.898 16.881 -6.307 -5.9178 -8.2722 49.5761 64.0938 -17.5 -1.2308BOBJ1 20 72 Span 2 Right Exterior Girder 36.6266 Before Str I-DL 24 Combination -0.746 31.975 -5.808 -10.3134 31.2012 -141.667 72 -17.5 -1.2308BOBJ1 21 72 Span 2 Right Exterior Girder 36.6266 After Str I-DL 24 Combination -2.172 32.379 -2.165 -7.3999 27.1156 -140.641 72 -17.5 -1.2308BOBJ1 22 77 Span 2 Right Exterior Girder 41.6281 Before Str I-DL 24 Combination -2.328 42.34 4.562 -9.4137 21.3706 -326.754 77 -17.375 -1.3449BOBJ1 23 77 Span 3 Right Exterior Girder 0 After Str I-DL 24 Combination -6.38 -48.324 -3.047 12.8285 24.9332 -366.324 77 -17.375 -1.3449BOBJ1 24 82 Span 3 Right Exterior Girder 5.0016 Before Str I-DL 24 Combination -4.929 -38.342 4.628 10.6586 24.9953 -151.74 82 -17.5 -1.2308BOBJ1 25 82 Span 3 Right Exterior Girder 5.0016 After Str I-DL 24 Combination -1.914 -37.952 8.681 13.9867 34.506 -153.899 82 -17.5 -1.2308BOBJ1 26 92 Span 3 Right Exterior Girder 15.0016 Before Str I-DL 24 Combination 6.845 -18.619 8.544 8.2369 -25.9147 122.6463 92 -17.5 -1.2308BOBJ1 27 92 Span 3 Right Exterior Girder 15.0016 After Str I-DL 24 Combination 10.994 -18.247 6.873 7.0611 -11.9722 119.6876 92 -17.5 -1.2308BOBJ1 28 102 Span 3 Right Exterior Girder 25.0016 Before Str I-DL 24 Combination 16.801 1.038 3.496 -1.409 -43.8907 201.5823 102 -17.5 -1.2308BOBJ1 29 102 Span 3 Right Exterior Girder 25.0016 After Str I-DL 24 Combination 17.147 0.874 -3.251 1.0806 -42.5658 201.2032 102 -17.5 -1.2308BOBJ1 30 112 Span 3 Right Exterior Girder 35.0016 Before Str I-DL 24 Combination 12.747 20.131 -6.551 -7.4318 -8.5355 99.2755 112 -17.5 -1.2308BOBJ1 31 112 Span 3 Right Exterior Girder 35.0016 After Str I-DL 24 Combination 9.476 20.478 -8.104 -8.5914 -19.2921 101.6216 112 -17.5 -1.2308BOBJ1 32 122 Span 3 Right Exterior Girder 45.0016 Before Str I-DL 24 Combination 3.076 39.758 -7.254 -13.7652 40.7251 -194.975 122 -17.5 -1.2308BOBJ1 33 122 Span 3 Right Exterior Girder 45.0016 After Str I-DL 24 Combination 1.567 40.123 -2.229 -9.8025 36.5769 -193.886 122 -17.5 -1.2308BOBJ1 34 127 Span 3 Right Exterior Girder 50.0031 Before Str I-DL 24 Combination 1.387 50.097 6.756 -10.7964 24.8885 -419.165 127 -17.375 -1.3449BOBJ1 35 127 Span 4 Right Exterior Girder 0 After Str I-DL 24 Combination 1.578 -49.259 -6.575 10.3367 25.0067 -415.124 127 -17.375 -1.3449BOBJ1 36 132 Span 4 Right Exterior Girder 5.0016 Before Str I-DL 24 Combination 1.791 -39.289 2.218 9.2709 36.3867 -194.028 132 -17.5 -1.2308BOBJ1 37 132 Span 4 Right Exterior Girder 5.0016 After Str I-DL 24 Combination 3.346 -38.926 7.13 13.1391 40.727 -195.143 132 -17.5 -1.2308

Page 83 ends

BOBJ1 38 142 Span 4 Right Exterior Girder 15.0016 Before Str I-DL 24 Combination 9.782 -19.65 7.931 7.8868 -17.7296 93.0952 142 -17.5 -1.2308 BOBJ1 39 142 Span 4 Right Exterior Girder 15.0016 After Str I-DL 24 Combination 13.114 -19.299 6.399 6.7483 -6.7166 90.7208 142 -17.5 -1.2308BOBJ1 40 152 Span 4 Right Exterior Girder 25.0016 Before Str I-DL 24 Combination 17.576 -0.041 3.196 -1.6666 -39.6113 184.2398 152 -17.5 -1.2308BOBJ1 41 152 Span 4 Right Exterior Girder 25.0016 After Str I-DL 24 Combination 17.201 -0.343 -3.894 0.4476 -40.9462 184.4618 152 -17.5 -1.2308BOBJ1 42 162 Span 4 Right Exterior Girder 35.0016 Before Str I-DL 24 Combination 11.133 18.923 -7.142 -7.973 -6.7576 95.8574 162 -17.5 -1.2308BOBJ1 43 162 Span 4 Right Exterior Girder 35.0016 After Str I-DL 24 Combination 7.008 19.281 -8.729 -9.1159 -20.5759 98.8142 162 -17.5 -1.2308BOBJ1 44 172 Span 4 Right Exterior Girder 45.0016 Before Str I-DL 24 Combination -1.345 38.593 -8.236 -14.4432 40.265 -184.567 172 -17.5 -1.2308BOBJ1 45 172 Span 4 Right Exterior Girder 45.0016 After Str I-DL 24 Combination -3.888 38.974 -3.63 -10.7295 32.4383 -182.738 172 -17.5 -1.2308BOBJ1 46 177 Span 4 Right Exterior Girder 50.0031 Before Str I-DL 24 Combination -4.882 48.958 4.784 -12.2002 27.0924 -400.988 177 -17.375 -1.3449BOBJ1 47 177 Span 5 Right Exterior Girder 0 After Str I-DL 24 Combination -4.705 -48.79 -5.446 11.0916 25.9893 -400.947 177 -17.375 -1.3449BOBJ1 48 182 Span 5 Right Exterior Girder 5.0016 Before Str I-DL 24 Combination -4.2 -38.816 2.92 9.6478 33.0612 -183.142 182 -17.5 -1.2308BOBJ1 49 182 Span 5 Right Exterior Girder 5.0016 After Str I-DL 24 Combination -2.251 -38.449 7.512 13.3023 38.8017 -184.538 182 -17.5 -1.2308BOBJ1 50 192 Span 5 Right Exterior Girder 15.0016 Before Str I-DL 24 Combination 4.763 -19.162 8.035 7.8826 -19.8073 98.4579 192 -17.5 -1.2308BOBJ1 51 192 Span 5 Right Exterior Girder 15.0016 After Str I-DL 24 Combination 8.295 -18.808 6.477 6.7372 -8.0685 95.9405 192 -17.5 -1.2308BOBJ1 52 202 Span 5 Right Exterior Girder 25.0016 Before Str I-DL 24 Combination 13.101 0.454 3.239 -1.6851 -40.3259 184.2817 202 -17.5 -1.2308BOBJ1 53 202 Span 5 Right Exterior Girder 25.0016 After Str I-DL 24 Combination 12.894 0.154 -3.81 0.4312 -41.0197 184.3886 202 -17.5 -1.2308BOBJ1 54 212 Span 5 Right Exterior Girder 35.0016 Before Str I-DL 24 Combination 7.18 19.415 -7.065 -8.0086 -6.3293 90.581 212 -17.5 -1.2308BOBJ1 55 212 Span 5 Right Exterior Girder 35.0016 After Str I-DL 24 Combination 3.252 19.769 -8.626 -9.1458 -19.433 93.397 212 -17.5 -1.2308BOBJ1 56 222 Span 5 Right Exterior Girder 45.0016 Before Str I-DL 24 Combination -4.567 39.07 -7.906 -14.3479 41.3038 -195.195 222 -17.5 -1.2308BOBJ1 57 222 Span 5 Right Exterior Girder 45.0016 After Str I-DL 24 Combination -6.778 39.445 -3.093 -10.5012 34.6632 -193.604 222 -17.5 -1.2308BOBJ1 58 227 Span 5 Right Exterior Girder 50.0031 Before Str I-DL 24 Combination -7.506 49.426 5.573 -11.7555 27.2938 -414.086 227 -17.375 -1.3449BOBJ1 59 227 Span 6 Right Exterior Girder 0 After Str I-DL 24 Combination -7.667 -50.208 -6.108 10.7945 26.7705 -419.888 227 -17.375 -1.3449BOBJ1 60 232 Span 6 Right Exterior Girder 5.0016 Before Str I-DL 24 Combination -7.298 -40.239 2.693 9.5627 35.233 -195.228 232 -17.5 -1.2308BOBJ1 61 232 Span 6 Right Exterior Girder 5.0016 After Str I-DL 24 Combination -5.475 -39.88 7.588 13.4133 40.4819 -196.534 232 -17.5 -1.2308BOBJ1 62 242 Span 6 Right Exterior Girder 15.0016 Before Str I-DL 24 Combination 1.466 -20.614 8.34 8.098 -20.5575 100.9368 242 -17.5 -1.2308BOBJ1 63 242 Span 6 Right Exterior Girder 15.0016 After Str I-DL 24 Combination 5.026 -20.267 6.789 6.9354 -8.7744 98.3992 242 -17.5 -1.2308BOBJ1 64 252 Span 6 Right Exterior Girder 25.0016 Before Str I-DL 24 Combination 9.88 -1.009 3.458 -1.5911 -43.6732 201.3196 252 -17.5 -1.2308BOBJ1 65 252 Span 6 Right Exterior Girder 25.0016 After Str I-DL 24 Combination 9.797 -1.169 -3.219 0.8955 -44.0443 201.3923 252 -17.5 -1.2308BOBJ1 66 262 Span 6 Right Exterior Girder 35.0016 Before Str I-DL 24 Combination 4.459 18.114 -6.635 -7.6066 -13.2255 120.443 262 -17.5 -1.2308BOBJ1 67 262 Span 6 Right Exterior Girder 35.0016 After Str I-DL 24 Combination 0.596 18.486 -8.309 -8.7786 -26.1552 123.213 262 -17.5 -1.2308BOBJ1 68 272 Span 6 Right Exterior Girder 45.0016 Before Str I-DL 24 Combination -7.681 37.831 -8.395 -14.4284 33.2048 -152.436 272 -17.5 -1.2308BOBJ1 69 272 Span 6 Right Exterior Girder 45.0016 After Str I-DL 24 Combination -10.479 38.227 -4.368 -11.0987 24.4629 -150.425 272 -17.5 -1.2308BOBJ1 70 277 Span 6 Right Exterior Girder 50.0031 Before Str I-DL 24 Combination -11.798 48.214 3.219 -13.2759 24.4787 -363.914 277 -17.375 -1.3449BOBJ1 71 277 Span 7 Right Exterior Girder 0 After Str I-DL 24 Combination -7.99 -42.65 -4.314 9.9558 22.0434 -331.075 277 -17.375 -1.3449BOBJ1 72 282 Span 7 Right Exterior Girder 5.0016 Before Str I-DL 24 Combination -7.641 -32.684 2.435 7.905 26.4973 -144.216 282 -17.5 -1.2308BOBJ1 73 282 Span 7 Right Exterior Girder 5.0016 After Str I-DL 24 Combination -5.946 -32.274 6.094 10.8591 31.5234 -145.435 282 -17.5 -1.2308BOBJ1 74 289.9063 Span 7 Right Exterior Girder 12.9078 Before Str I-DL 24 Combination -2.982 -17.172 6.594 6.4969 -9.095 47.9122 289.9063 -17.5 -1.2308BOBJ1 75 289.9063 Span 7 Right Exterior Girder 12.9078 After Str I-DL 24 Combination 0.044 -16.718 5.36 5.6172 0.8853 45.7492 289.9063 -17.5 -1.2308BOBJ1 76 297.8125 Span 7 Right Exterior Girder 20.8141 Before Str I-DL 24 Combination 2.416 -1.63 3.496 -0.4908 -26.1229 116.586 297.8125 -17.5 -1.2308BOBJ1 77 297.8125 Span 7 Right Exterior Girder 20.8141 After Str I-DL 24 Combination 2.66 -1.151 -2.501 1.215 -25.3747 116.4519 297.8125 -17.5 -1.2308BOBJ1 78 305.7188 Span 7 Right Exterior Girder 28.7203 Before Str I-DL 24 Combination 0.734 13.951 -4.429 -4.8937 -4.5137 67.2242 305.7188 -17.5 -1.2308BOBJ1 79 305.7188 Span 7 Right Exterior Girder 28.7203 After Str I-DL 24 Combination -1.996 14.43 -5.849 -5.8386 -13.5641 69.1758 305.7188 -17.5 -1.2308BOBJ1 80 313.625 Span 7 Right Exterior Girder 36.6266 Before Str I-DL 24 Combination -4.963 29.565 -5.898 -10.4973 23.2188 -102.621 313.625 -17.5 -1.2308BOBJ1 81 313.625 Span 7 Right Exterior Girder 36.6266 After Str I-DL 24 Combination -7.039 29.999 -3.215 -8.22 16.7797 -101.132 313.625 -17.5 -1.2308BOBJ1 82 318.625 Span 7 Right Exterior Girder 41.6281 Before Str I-DL 24 Combination -7.711 39.985 2.372 -11.2617 17.8624 -274.412 318.625 -17.375 -1.3449BOBJ1 83 318.625 Span 8 Right Exterior Girder 0 After Str I-DL 24 Combination -9.411 -43.335 -1.384 14.0595 18.7429 -290.167 318.625 -17.375 -1.3449BOBJ1 84 323.625 Span 8 Right Exterior Girder 5.0016 Before Str I-DL 24 Combination -8.016 -33.339 4.483 10.7428 14.3976 -100.874 323.625 -17.5 -1.2308BOBJ1 85 323.625 Span 8 Right Exterior Girder 5.0016 After Str I-DL 24 Combination -5.586 -32.97 7.247 13.1106 22.0155 -102.613 323.625 -17.5 -1.2308BOBJ1 86 332.0833 Span 8 Right Exterior Girder 13.4599 Before Str I-DL 24 Combination 0.297 -16.63 6.71 7.9724 -19.7869 102.9007 332.0833 -17.5 -1.2308BOBJ1 87 332.0833 Span 8 Right Exterior Girder 13.4599 After Str I-DL 24 Combination 2.837 -16.333 5.166 6.9427 -11.403 101.088 332.0833 -17.5 -1.2308

Page 84 ends
← All documents from this meeting