Gossamer Grove
Wastewater and Refuse Assessments FY2024-2025
Year of First
Assessment Permit No Lot Tract Address APN ATN Valuation Finaled 2022/23 No. of Months to be
billed
2023/24 No. of Months to be
billed 2024/25 No. of Months to be billed
FY22/23 Monthly
Wastewater Charge
FY23/24 Monthly Wastewater
Charge
FY 2024/25 Monthly
Wastewater Charge Adjustment
Annual Wastewater
Assessment
(20519)
2023/24 No. of Months to be
billed FY 24/25 Monthly Refuse Charge Adjustment
Annual Refuse Assessment
(20518) Total Assessment
Property Information Wastewater Assessment Refuse Assessment 2025 23-0853 57 7319-3 9602 REDWOOD RIVER LN 482-501-10 482-501-10-00-5 170,802 2/20/2024 12 29.92 5 $ 29.92 $ 29.92 $ - $ $ 508.64 12 33.30 $ - $ $ 908.24 399.60 $ 2025 23-0857 55 7319-3 9610 REDWOOD RIVER LN 482-501-08 482-501-08-00-0 198,388 2/20/2024 12 29.92 5 $ 29.92 $ 29.92 $ - $ $ 508.64 12 33.30 $ - $ $ 908.24 399.60 $ 2025 22-0999 19 7346-3 9413 WOODLAND CREEK DR 482-473-04 482-473-04-00-4 262,000 2/22/2024 12 29.92 5 $ 29.92 $ 29.92 $ - $ $ 508.64 12 33.30 $ - $ $ 908.24 399.60 $ 2025 23-0261 330 7388 8917 WINDMILL DR 482-562-17 482-562-17-00-1 272,798 2/23/2024 12 29.92 5 $ 29.92 $ 29.92 $ - $ $ 508.64 12 33.30 $ - $ $ 908.24 399.60 $ 2025 23-0263 331 7388 8921 WINDMILL DR 482-562-16 482-562-16-00-8 350,068 2/23/2024 12 29.92 5 $ 29.92 $ 29.92 $ - $ $ 508.64 12 33.30 $ - $ $ 908.24 399.60 $ 2025 23-0854 38 7319-3 9603 REDWOOD RIVER LN 482-502-10 482-502-10-00-2 170,802 2/23/2024 12 29.92 5 $ 29.92 $ 29.92 $ - $ $ 508.64 12 33.30 $ - $ $ 908.24 399.60 $ 2025 23-0856 39 7319-3 9607 REDWOOD RIVER LN 482-502-09 482-502-09-00-0 198,388 2/26/2024 12 29.92 5 $ 29.92 $ 29.92 $ - $ $ 508.64 12 33.30 $ - $ $ 908.24 399.60 $ 2025 23-0859 54 7319-3 9614 REDWOOD RIVER LN 482-501-07 482-501-07-00-7 170,802 2/26/2024 12 29.92 5 $ 29.92 $ 29.92 $ - $ $ 508.64 12 33.30 $ - $ $ 908.24 399.60 $ 2025 23-0858 40 7319-3 9611 REDWOOD RIVER LN 482-502-08 482-502-08-00-7 170,802 2/26/2024 12 29.92 5 $ 29.92 $ 29.92 $ - $ $ 508.64 12 33.30 $ - $ $ 908.24 399.60 $ 2025 22-0996 13 7346-3 9408 WOODLAND CREEK DR 482-472-13 482-472-13-00-3 262,000 3/5/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 22-0998 12 7346-3 9412 WOODLAND CREEK DR 482-472-12 482-472-12-00-0 355,562 3/5/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0264 332 7388 8925 WINDMILL DR 482-562-15 482-562-15-00-5 272,798 3/6/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0260 302 7388 8914 WINDMILL DR 482-563-21 482-563-21-00-9 272,798 3/7/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0262 301 7388 8918 WINDMILL DR 482-563-20 482-563-20-00-6 350,068 3/7/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0861 53 7319-3 9618 REDWOOD RIVER LN 482-501-06 482-501-06-00-4 198,388 3/11/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0250 336 7388 3712 NEEDHAM LN 482-562-11 482-562-11-00-3 202,822 3/15/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0254 333 7388 3724 NEEDHAM LN 482-562-14 482-562-14-00-2 350,068 3/15/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0860 11 7346-3 9615 REDWOOD RIVER LN 482-502-07 482-472-11-00-7 227,731 3/15/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 22-1000 11 7346-3 9416 WOODLAND CREEK DR 482-472-11 482-472-11-00-7 262,000 3/18/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0864 43 7319-3 9623 REDWOOD RIVER LN 482-502-05 482-502-05-00-8 198,388 3/18/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 22-1001 20 7346-3 9417 WOODLAND CREEK DR 482-473-05 482-473-05-00-7 355,562 3/20/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0251 300 7388 3713 NEEDHAM LN 482-563-19 482-563-19-00-4 202,822 3/21/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0252 335 7388 3716 NEEDHAM LN 482-562-12 482-562-12-00-6 350,068 3/21/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0253 334 7388 3720 NEEDHAM LN 482-562-13 482-562-13-00-9 272,798 3/21/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 23-0862 42 7319-3 9619 REDWOOD RIVER LN 482-502-06 482-502-06-00-1 170,802 3/21/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 22-1002 21 7346-3 9421 WOODLAND CREEK DR 482-473-06 482-473-06-00-0 230,081 3/22/2024 12 29.92 4 $ 29.92 $ 29.92 $ - $ $ 478.72 12 33.30 $ - $ $ 878.32 399.60 $ 2025 22-1003 22 7346-3 9425 WOODLAND CREEK DR 482-473-07 482-473-07-00-3 355,562 4/3/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0212 341 7388 8918 CANYON SAGE DR 482-562-06 482-562-06-00-9 272,798 4/24/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0214 340 7388 8922 CANYON SAGE DR 482-562-07 482-562-07-00-2 202,822 4/18/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0246 339 7388 3700 NEEDHAM LN 482-562-08 482-562-08-00-5 350,068 4/18/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0247 338 7388 3704 NEEDHAM LN 482-562-09 482-562-09-00-8 272,798 4/15/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0248 337 7388 3708 NEEDHAM LN 482-562-10 482-562-10-00-0 350,068 4/5/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0249 299 7388 3709 NEEDHAM LN 482-563-18 482-563-18-00-1 272,798 4/5/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0863 52 7319-3 9622 REDWOOD RIVER LN 482-501-05 482-501-05-00-1 227,731 4/12/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0865 51 7319-3 9626 REDWOOD RIVER LN 482-501-04 482-501-04-00-8 198,388 4/4/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0866 44 7319-3 9627 REDWOOD RIVER LN 482-502-04 482-502-04-00-5 170,802 4/9/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0867 50 7319-3 9630 REDWOOD RIVER LN 482-501-03 482-501-03-00-5 170,802 4/11/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0868 45 7319-3 9631 REDWOOD RIVER LN 482-502-03 482-502-03-00-2 227,731 4/12/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0869 49 7319-3 9634 REDWOOD RIVER LN 482-501-02 482-501-02-00-2 227,731 4/17/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0870 46 7319-3 9635 REDWOOD RIVER LN 482-502-02 482-502-02-00-9 198,388 4/25/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0871 48 7319-3 9638 REDWOOD RIVER LN 482-501-01 482-501-01-00-9 170,802 4/25/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0872 47 7319-3 9639 REDWOOD RIVER LN 482-502-01 482-502-01-00-6 170,802 4/25/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-1015 77 7319-3 3301 MULBERRY GROVE WAY 482-501-31 482-501-31-00-6 162,765 4/10/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-1016 75 7319-3 3304 MULBERRY GROVE WAY 482-501-29 482-501-29-00-1 187,151 4/17/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-1017 78 7319-3 3305 MULBERRY GROVE WAY 482-501-32 482-501-32-00-9 207,930 4/10/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-1018 74 7319-3 3308 MULBERRY GROVE WAY 482-501-28 482-501-28-00-8 162,765 4/18/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-1019 79 7319-3 3309 MULBERRY GROVE WAY 482-501-33 482-501-33-00-2 187,151 4/5/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-1020 80 7319-3 3313 MULBERRY GROVE WAY 482-501-34 482-501-34-00-5 207,930 4/5/2024 12 29.92 3 $ 29.92 $ 29.92 $ - $ $ 448.80 12 33.30 $ - $ $ 848.40 399.60 $ 2025 23-0208 343 7388 8910 CANYON SAGE DR 482-562-04 482-562-04-00-3 272,798 5/3/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-0210 342 7388 8914 CANYON SAGE DR 482-562-05 482-562-05-00-6 350,068 5/3/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-0211 297 7388 8917 CANYON SAGE DR 482-563-16 482-563-16-00-5 202,822 5/3/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-0213 298 7388 8921 CANYON SAGE DR 482-563-17 482-563-17-00-8 350,068 5/3/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-0207 295 7388 8909 CANYON SAGE DR 482-563-14 482-563-14-00-9 202,822 5/9/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-1011 59 7319-3 9607 CLEAR RIDGE WAY 482-501-12 482-501-12-00-1 187,151 5/9/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-1111 60 7319-3 9611 CLEAR RIDGE WAY 482-501-13 482-501-13-00-4 16,265 5/9/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-1112 61 7319-3 9615 CLEAR RIDGE WAY 482-501-14 482-501-14-00-7 187,151 5/9/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-0206 344 7388 8906 CANYON SAGE DR 482-562-03 482-562-03-00-0 202,822 5/10/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-1110 73 7319-3 3309 LILAC VIEW CT 482-501-27 482-501-27-00-5 162,765 5/13/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-0205 294 7388 8905 CANYON SAGE DR 482-563-13 482-563-13-00-6 272,798 5/15/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-0209 296 7388 8913 CANYON SAGE DR 482-563-15 482-563-15-00-2 350,068 5/15/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-1109 72 7319-3 3305 LILAC VIEW CT 482-501-26 482-501-26-00-2 187,151 5/15/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-1108 70 7319-3 3302 LILAC VIEW CT 482-501-24 482-501-24-00-6 162,765 5/16/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-0204 345 7388 8902 CANYON SAGE DR 482-562-02 482-562-02-00-7 350,068 5/17/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ 2025 23-1032 76 7319-3 3300 MULBERRY GROVE WAY 482-501-30 482-501-30-00-3 245,948 5/23/2024 12 29.92 2 $ 29.92 $ 29.92 $ - $ $ 418.88 12 33.30 $ - $ $ 818.48 399.60 $ $ 620,690.40 $ 1,253,257.20 632,566.80 $
***Cut off date for parcels to be assigned rates was 5/31/2024. Any lots finaled after 5/31/2024 shall be assessed beginning in the 25/26 fiscal year.

Alexander P. Gonzalez, PEDeputy Public Works Director - Capital ProjectAssessment Engineer 7/2/2024
Date:
18 of 18

Page 369 of 494 ends

PUBLIC HEARINGS

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: July 16, 2024
FROM: Gabriel A. Gonzalez, City Manager
PREPARED BY: Alex Gonzalez, Deputy Public Works Director SUBJECT: ORDER ANNUAL LEVY OF ASSESSMENTS WITHIN EXISTING

LANDSCAPING AND LIGHTING DISTRICTS FOR FISCAL YEAR
2024-2025 RESOLUTION ADOPTION

RECOMMENDATION
Council find the action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines; conduct a public hearing on the Proposed Annual Levy of Assessments for Existing Landscape and Lighting Districts; and adopt Resolution 2977, a Resolution of the City Council of the City of Shafter Confirming Engineer’s Report, Diagram and Assessment for Existing Landscaping and Lighting Districts and Ordering the Levy and Collection of Assessments for Fiscal Year 2024-2025.

BACKGROUND
On June 18, 2024, the Council adopted Resolution No. 2973, which declared the intention to levy and collect assessments within existing landscaping and lighting districts for the Fiscal Year 2024-2025 pursuant to the Landscaping and Lighting Act of 1972 for the maintenance and servicing of lighting and landscaping and giving notice of and setting the time and place of the hearing on the annual levy of assessments.

ANALYSIS
The existing districts subject to annual levy of assessments are as follows:

LL001-95 (Tract 5774)
LL001-98 (Tract 5610, APN 026-321-01)
LL001-2002 (Tract 5856)
LL001-2005 (Tracts 6179, 6286, 6287)
LL002-2005 (Tract 6301, 7033)
LL003-2005 (Tract 6222, 6584, 6910, 6936)
LL004-2005 (Tract 6467)
LL001-2006 (Tract 6437, Tract 6713)
LL001-2007 (Tracts 6738, 6447, 6540)
LL002-2007 (Tract 6777)
LL001-2009 (Wonderful Logistics Park & City Rail Site)
LL001-2015 (Gossamer Grove)
LL001-2021 (Tract 7318)

Page 370 of 494 ends

ORDER ANNUAL LEVY OF ASSESSMENTS WITHIN EXISTING LANDSCAPING AND LIGHTING DISTRICTS FOR FISCAL YEAR 2024-2025 RESOLUTION ADOPTION - 2 -
LL001-2022 (Tract 6490)
Resolution No. 2973 also approved the engineer’s reports for each district to recommend assessments for the districts parcels. The City has published a notice of the public hearing on the proposed annual levying of assessments listed on this meeting agenda. After conducting the hearing, the Council can order the annual levy of assessments for the districts by adopting Resolution No. 2977.

FISCAL IMPACT
The 2024-2025 Fiscal Year budget reflects the estimated expenditures and assessments outlined in the approved engineer's reports prepared for each district listed above.

CEQA ANALYSIS
The action is not defined as a "Project" per Section 15378(b)(5) of the CEQA guidelines because the action is approval of a resolution to authorize annual levy of assessments for LLMDs and therefore, it is organizational and administrative activity that will not result in direct or indirect physical changes to the environment and not subject to CEQA.

APPROVED BY THE CITY ATTORNEY
Not Applicable

ALTERNATIVES
Landscape and lighting districts ensure that the benefitting property owners assume most of the operational and maintenance costs for specific improvements with minimal use of the General Fund. State law requires the Council action to approve levies for these districts on an annual basis formally. Failure to conduct an annual levy process would put the financial burden of operating and maintaining district facilities solely on the General Fund. Therefore, the recommended action is the best and only option for the Council to consider.

NEXT STEPS
Upon approval of the resolution, City Staff will file a copy of the Report and affected ATNs with the Kern County Treasurer-Tax Collector before the August 9, 2024 deadline.

ATTACHMENTS

1. Resolution 2977 Order Levy of Assessments

Page 371 of 494 ends

RESOLUTION NO. 2977

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHAFTER CONFIRMING ENGINEER’S REPORT, DIAGRAM AND ASSESSMENT FOR

EXISTING LANDSCAPING AND LIGHTING DISTRICTS AND ORDERING THE LEVY AND COLLECTION OF ASSESSMENTS FOR FISCAL YEAR 2024-2025 WHEREAS, June 18, 2024, the City Council (the “City Council”) of the City of Shafter (the “City”) adopted Resolution 2973, a resolution of intention pursuant to Section 22624 of the Streets and Highways Code, which, among other things, scheduled a public hearing on the levy and collection of assessments on the lots and parcels of assessable property within existing Landscaping and Lighting Districts within the City of Shafter as listed in Exhibit “A” (the "Assessment Districts") for fiscal year 2024-2025 pursuant to the Landscaping and Lighting Act of 1972, Part 2 (commencing with Section 22500) of Division 15 of the Streets and Highways Code (the "Act") for 6:00 p.m. on July 16, 2024, in the City Council Chambers at the City Hall of the City of Shafter located at 336 Pacific Avenue, Shafter, CA, 93263; and WHEREAS, notice of said hearing was duly published as required by Section 22626(a) of the Act; and
WHEREAS, at the time and place of said hearing, as set forth in said resolution of intention, the City Council held the hearing and afforded all interested persons an opportunity to be heard, and considered all oral statements and all written protests or communications made or filed by any interested persons;
NOW, THEREFORE, BE IT RESOLVED, DETERMINED AND ORDERED by the City Council of the City of Shafter, California, as follows:

Section 1. Findings. The City Council finds that: (i) the preceding recitals are true and correct and are incorporated herein by this reference;
(ii) compliance has been had with all of the applicable requirements of the Act; (iii) the City Council may therefore proceed to confirm the engineer’s report, diagram and assessment for the Assessment Districts for fiscal year 2024-2025, and order the levy and collection of the assessment; (iv) the assessments proposed to be levied on the lots and parcels of assessable property within the Assessment Districts for the maintenance and servicing of the improvements during fiscal year 2024-2025, as described in a report for each district prepared by the Public Works Director, or his/her designee, on file with the City Clerk (the "Report"), are based on the proportionate special benefit derived by such lots and parcels from the availability of such public lighting facilities; (v) the proportionate special benefit derived by each such lot or parcel has been determined in relationship to the entirety of the cost of the maintenance and servicing of such public lighting facilities; (vi) such assessments do not exceed the reasonable cost of the proportional special benefit conferred on each such lot and parcel; and (vii) such assessments will not exceed the maximum amounts of the assessments authorized by a vote of the property owners in the Assessment Districts.

Section 2. Levy of Assessment: Pursuant to Section 22631 of the Streets and Highways Code, the adoption of this resolution constitutes the levy of the assessment for the maintenance and servicing of the improvements within the Assessment Districts during fiscal year 2024-2025, as described in the Report, and such assessment is hereby levied. The City Clerk is

Page 372 of 494 ends

Shafter City Council Resolution No. 2977
July 16, 2024

Page 2 ends

directed to file a certified copy of this resolution together with the assessment contained in the Report with the County Auditor of the County of Kern, who, pursuant to Section 22645 of the Streets and Highways Code, shall enter on the County Assessment Roll opposite each lot or parcel of land the amount assessed thereupon, as shown in said assessment.

Section 3. Compliance with State Law. The City of Shafter certifies that these assessments comply with the requirements of Article XIIID of the State of California Constitution.

Section 4. Effective Date. This Resolution shall be effective immediately upon its adoption.

PASSED AND ADOPTED this 16th day of July, 2024
____________________________
Chad Givens, Mayor
ATTEST:
_____________________________
Yazmina Pallares, City Clerk
APPROVED AS TO FORM:
______________________________
Marco A. Martinez, City Attorney

Page 373 of 494 ends

Shafter City Council Resolution No. 2977
July 16, 2024

Page 3 ends

EXHIBIT “A”
SHAFTER CITY COUNCIL RESOLUTION NO. 2977
July 16, 2024
District No. Developments Served Formation Approval Date LL001-95 Tract 5774 January 9, 1996
LL001-98 Tract 5610
APN 026-321-01 January 9, 1999
LL001-2002 Tract 5856 July 15, 2003
LL001-2005
Tract 6179
Tract 6286
Tract 6287
August 16, 2005
LL002-2005 Tract 6301
Tract 7033 August 16, 2005
LL003-2005
Tract 6222
Tract 6584
Tract 6910
Tract 6936
October 18, 2005
LL004-2005 Tract 6467 December 6, 2005
LL001-2006 Tract 6437, 6713 September 5, 2006
LL001-2007
Tract 6738
Tract 6447
Tract 6540
January 16, 2007
LL002-2007 Tract 6777 July 17, 2007
LL001-2009 Wonderful Logistics Park June 16, 2009
LL001-2015 Gossamer Grove Specific Plan February 16, 2016 LL001-2021 Tract 7318 August 17, 2021
LL001-2022 Tract 6490 June 7, 2022

Page 374 of 494 ends

MANAGEMENT REPORT

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: July 16, 2024
FROM: Gabriel A. Gonzalez, City Manager
PREPARED BY: Giovanni Perez, Administrative Analyst II
SUBJECT: ADOPTION OF RESOLUTION 2978 FOR DECLARATION OF THREE CLUSTERS OF LAND, 1) NEAR E. LERDO HWY &
ZERKER RD, 2) NEAR E. LERDO HWY & GOLDS AVE, AND 3)
NEAR E. TULARE AVE & N. SHAFTER AVE, AS SURPLUS

PROPERTY, APPROVAL OF A FORM OF NOTICE OF

AVAILABILITY, AND AUTHORIZATION OF THE CITY MANAGER

OR HIS DESIGNEE TO COMPLY WITH THE SURPLUS LAND
ACT

RECOMMENDATION

1. Find that the proposed declaration of land as surplus property is exempt from environmental review pursuant to the California Environmental Quality Act (Pub.

Resources Code, §§21000 et seq.) (CEQA) and the State CEQA Guidelines (Cal. Code Regs. tit. 14, §15312), which applies to the declaration and sale of surplus government property; and adopt Resolution 2978, a Resolution of the City Council of the City of Shafter Declaring property located at 1) 5821, 5901, AND 5921 E. Lerdo Highway (APN 091-171-30, 091-171-31, 091-171-22), 2) E. Lerdo Highway & Golds Avenue (APN 089-140-73, 089-140-75, 089-230-67), and 3) E. Tulare Avenue & N Shafter Avenue (APN 028-010-12, 028-010-09) as non-exempt surplus land; Approving the form of Notice of Availability; Directing the City Manager to comply with the requirements of the Surplus Land Act, Government Code Section 54220, ET SEQ.; and finding the action is exempt from CEQA.

BACKGROUND
The City of Shafter (“City”) owns real property of 12.34 acres located at 5821, 5901, and 5921 E. Lerdo Highway in Shafter (“Subject Property 1”). This Subject Property 1 is zoned Business Park – Airport Approach Height and located across from Minter Field.

The City of Shafter (“City”) owns real property of 10.60 acres located at E. Lerdo Highway and Golds Avenue in Shafter (“Subject Property 2”). This Subject Property 2 is zoned Business Park and located across from a quarter-mile east of S Beech Ave.

The City of Shafter (“City”) owns real property of 9.57 acres located at E. Tulare Avenue and N. Shafter Avenue in Shafter (“Subject Property 3”). This Subject Property 3 is zoned Medium Density Residential and located east of Central Valley Highway.

Page 375 of 494 ends

ADOPTION OF RESOLUTION 2978 FOR DECLARATION OF THREE CLUSTERS OF LAND, 1) NEAR E. LERDO HWY & ZERKER RD, 2) NEAR E. LERDO HWY & GOLDS AVE, AND 3) NEAR E.

TULARE AVE & N. SHAFTER AVE, AS SURPLUS PROPERTY, APPROVAL OF A FORM OF NOTICE

OF AVAILABILITY, AND AUTHORIZATION OF THE CITY MANAGER OR HIS DESIGNEE TO

COMPLY WITH THE SURPLUS LAND ACT
- 2 -
Together, Subject Property 1, Subject Property 2, and Subject Property 3 are the “Subject Properties.”
In March of 2023, the City declared Subject Property 1 and Subject Property 2as surplus land under the California Surplus Land Act (Government Code Section 54220 et seq.) (the “Act”) and authorized the process for leasing Subject Property 1 and Subject Property 2, however, this item is being resubmitted to clearly authorize the City Manager to begin the process under the Act to make Subject Property 1 and Subject Property 2 available for sale as well. The rest of the Subject Properties would be declared as surplus land for the first time so that the City could proceed toward disposal.

The Act requires all local agencies to prioritize affordable housing, as well as parks and open space, when disposing of surplus land. New legislation which took effect on January 1, 2020, requires that before a local agency may dispose of land that is no longer necessary for its use, the land must be declared either "surplus land" or "exempt surplus land," as supported by written findings. Adoption of the Resolution would declare the Subject Properties as surplus land.

Upon the City's determination that the Subject Properties are surplus land, the procedures set forth in the Act must be followed prior to disposal. Those procedures require the City to offer the surplus land by issuing (via email wherever possible and by certified mail where not possible) by issuing a Notice of Availability, a form of which is attached to the Resolution as Exhibit D (the “Notice of Availability”), and accepting notices of interest for a period of 60 days.

If the City receives a letter of interest from any of the above entities, the City is required to enter into good faith negotiations concerning the price and terms of the sale or lease with that entity for a period of 90 days. If the price or terms cannot be agreed upon after 90 days (or if no entity gives notice of interest), the City may sell or lease the surplus land without further regard to the Act’s procedures, except that the City must obtain approval from the State’s Department of Housing and Community Development (HCD) that it complied with the Act, and the City must record a restrictive covenant on the Subject Properties, requiring that if ten or more residential units are ever built on the Subject Properties, at least 15% of those units must be affordable.

ANALYSIS

FISCAL IMPACT
No budget action required. There are minimal costs related to issuing a Notice of Availability via email.

CEQA ANALYSIS

Page 376 of 494 ends

ADOPTION OF RESOLUTION 2978 FOR DECLARATION OF THREE CLUSTERS OF LAND, 1) NEAR E. LERDO HWY & ZERKER RD, 2) NEAR E. LERDO HWY & GOLDS AVE, AND 3) NEAR E.

TULARE AVE & N. SHAFTER AVE, AS SURPLUS PROPERTY, APPROVAL OF A FORM OF NOTICE

OF AVAILABILITY, AND AUTHORIZATION OF THE CITY MANAGER OR HIS DESIGNEE TO

COMPLY WITH THE SURPLUS LAND ACT
- 3 -
The action is exempt from environmental review pursuant to the California Environmental Quality Act (Pub. Resources Code, §§21000 et seq.) (CEQA) and the State CEQA Guidelines (Cal. Code Regs. tit. 14, §15312), which applies to the declaration and sale of surplus government property.

APPROVED BY THE CITY ATTORNEY

ALTERNATIVES

1. Reject approval of the Adoption of Resolution #2978 for Declaration of Land as Surplus Property. STAFF DOES NOT RECOMMEND THIS OPTION.

NEXT STEPS
Posting of 60 Day Notice of Availability by City Attorney

ATTACHMENTS

1. Resolution 2978 City of Shafter Declaring Properties as Non Exempt Surplus Land

2. Notice of Availablity of Surplus Properties HCD Cover Letter and Properties Table

Page 377 of 494 ends

RESOLUTION NO. 2978

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHAFTER DECLARING PROPERTY LOCATED AT 1) 5821, 5901, AND 5921 E. LERDO HIGHWAY (APN 091-171-30, 091-171-31, 091-171-22), 2) E. LERDO HIGHWAY & GOLDS AVENUE (APN 089-140-73, 089-140-75, 089-230-67), and 3) E.

TULARE AVENUE & N SHAFTER AVENUE (APN 028-010-12, 028-010-09) AS NON-EXEMPT SURPLUS LAND; APPROVING THE FORM OF NOTICE OF AVAILABILITY; DIRECTING THE CITY MANAGER TO COMPLY WITH THE

REQUIREMENTS OF THE SURPLUS LAND ACT, GOVERNMENT CODE,
SECTION 54220 ET SEQ.; AND FINDING THE ACTION EXEMPT FROM CEQA
WHEREAS, the City of Shafter (the "City") owns that certain 12.34-acre property, located at 5821, 5901, 5921 E. Lerdo Highway, Shafter, CA 93263 (APNs 091-171-30, 091-171- 31, 091-171-22) zoned Business Park – Airport Approach Height, which is more particularly depicted at Exhibit A (the "Subject Property 1"); and
WHEREAS, the City owns that certain 10.60-acre property located at E. Lerdo Highway and Golds Avenue, Shafter, CA 93263 (APNs 089-140-73, 089-140-75, 089-230-67) zoned Business Park, which is more particularly depicted at Exhibit B (the "Subject Property 2"); and WHEREAS, the City owns that certain 9.57-acre property, located at E. Tulare Avenue and N. Shafter Avenue, Shafter, CA 93263 (APNs 028-010-12, 028-010-09) zoned Medium Density Residential, which is more particularly depicted at Exhibit C (the "Subject Property 3"); and
WHEREAS, together Subject Property 1, Subject Property 2, and Subject Property 3 are “the Properties”; and
WHEREAS, the Properties are not necessary for the City's use and none of the statutory exemptions set forth under Government Code Section 54221(f)(1) are applicable, and therefore the Properties and disposition thereof are subject to the Surplus Land Act (Government Code Section 54220 et seq.) (the "Act").

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SHAFTER HEREBY RESOLVES AS FOLLOWS:

Section 1. The above recitals are true and correct and are incorporated herein by this reference.

Section 2. The City Council finds and declares that the Properties are “surplus land” as used in the Act, because the Properties are owned in fee simple by the City, the Properties are not necessary for the City's use, as defined under the Act, Section 54221(c), and do not qualify as "exempt surplus land" under the Act, Section 54221(f)(1).

Section 3. The City Council approves the form of Notice of Availability, attached hereto as Exhibit D (the "Notice"), and authorizes the City Manager or designee to comply with the requirements of the Act, to t a i l o r , f i n a l i z e , a n d issue the Notice to those statutorily entitled to receive it (Section 54222), and to negotiate in good faith with those entities, if any, who

Page 378 of 494 ends

17236.01000\42442015.1
Shafter City Council Resolution No. 2978
July 16, 2024

Page 2 ends

submit qualified Notices of Interest (Sections 54222.5 and 54223).

Section 4. The action authorized by this Resolution does not authorize or approve the actual disposition or sale of the Properties. Thus, this action does not commit the City to any future action, nor does this action approve a particular project, or grant any specific approval that would have a direct or reasonably foreseeable indirect environmental impact pursuant to the California Environmental Quality Act ("CEQA"). (See 14 California Code of Regulations Sections15060(c); 15378(b).) As such, the mere declaration of surplus land and authorization to proceed under the Act do not constitute the approval of a "project" under CEQA, and no further action under CEQA is required. In addition, the action is exempt from environmental review pursuant to State CEQA Guidelines §15312, which applies to the declaration and sale of surplus government property.

Section 5. Severability. If any provision of this Resolution or the application thereof to any person or circumstance is held invalid, such invalidity shall not affect other provisions or applications, and to this end the provisions of this Resolution are declared to be severable.

Section 6. Effective Date. This Resolution shall become effective immediately.

PASSED, APPROVED AND ADOPTED THIS 16th DAY OF JULY, 2024. _______________________________
Chad Givens, Mayor
ATTEST:
_______________________________
Yazmina Pallares, City Clerk
APPROVED AS TO FORM:
_______________________________
Marco A. Martinez, City Attorney

Page 379 of 494 ends

17236.01000\42442015.1
Shafter City Council Resolution No. 2978
July 16, 2024

Page 3 ends

EXHIBIT A
Site Maps –
Subject Property 1

Page 380 of 494 ends

17236.01000\42442015.1
Shafter City Council Resolution No. 2978
July 16, 2024

Page 4 ends

EXHIBIT B
Site Maps –
Subject Property 2

Page 381 of 494 ends

17236.01000\42442015.1
Shafter City Council Resolution No. 2978
July 16, 2024

Page 5 ends

EXHIBIT C
Site Maps –
Subject Property 3

Page 382 of 494 ends

17236.01000\42442015.1
Shafter City Council Resolution No. 2978
July 16, 2024

Page 6 ends

EXHIBIT D
Form of Notice of Availability
(see attached Cover Letter and
Property Description Sheet)

Page 383 of 494 ends

17236.01000\42442015.1
July 16, 2024
To All Interested Parties:

RE: Notice of Availability/Offer to Sell Surplus Property As required by Government Code Section 54220 of the State of California, the City of Shafter is providing notification that the City intends to sell or lease the surplus property listed in the accompanying table.

In accordance with Government Code Section 54222, you have sixty (60) days from the date this offer was sent via certified mail or electronic mail to notify the City of your interest in acquiring the property. However, this offer shall not obligate the City to sell or lease the property to you. Instead, the City would enter into at least ninety (90) days of negotiations with you pursuant to Government Code Section 54223. If no agreement is reached on sales/lease price and terms, the City may market the property to the general public.

As required by Government Code Section 54227, if the City receives more than one letter of interest during this 60 day period, it will give first priority to entities proposing to develop housing where at least 25 percent of the units will be affordable to lower income households. If more than one such proposal is received, priority will be given to the proposal with the greatest number of affordable units.

If more than one proposal specifies the same number of affordable units, priority will be given to the proposal that has the lowest average affordability level.

In the event your agency or company is interested in purchasing or leasing the property, you must notify the City in writing within sixty (60) days of the date this notice was sent via certified mail or electronic mail. Notice of your interest in acquiring the property shall be delivered to City of Shafter, Attn: Gabriel Gonzalez, City Manager
336 Pacific Avenue, Shafter, CA 93263.

You may also direct your questions to [email protected] or by calling (661) 746-5000.

Entities proposing to submit a letter of interest are advised to review the requirements set forth in the Surplus Land Act (Government Code Section 54220-54234).

Page 384 of 494 ends

17236.01000\42442015.1
Property
# Jurisdiction Name Jurisdiction Type Site Address/Intersection 1 City of Shafter City
2 City of Shafter City
3 City of Shafter City
Property
# City
Five Digit ZIP
Code County Assessor Parcel Number
1 Shafter
2 Shafter
3 Shafter
Property
# Consolidated Sites
General Plan Designation
(Current)
Zoning Designation
(Current)
1 2
3 Property
# Minimum Density
Allowed (units/acre)
Maximum Density
Allowed (units/acre)
Parcel Size
(Gross
Acres) Existing Use/Vacancy
1 2
3 Property
# Minimum Sales Price Last Appraised Value Last Appraised Date 1 2
3 Property
# Optional Information
1 2
3

Page 385 of 494 ends

MANAGEMENT REPORT

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: July 16, 2024
FROM: Gabriel A. Gonzalez, City Manager
PREPARED BY: Michael James, Public Works Director
SUBJECT: FINALIZE AQUATICS CENTER BUILDING ELEVATION

DISCUSSION

RECOMMENDATION
Council find that the item does not trigger CEQA review; finalize discussion on building exterior and architectural features presented by Ordiz-Melby Architects; and provide design feedback to staff.

BACKGROUND
At its June 4, 2024 meeting, the Council was provided with profiles of two different design concepts for the exterior of a new building planned for the Shafter Aquatics Center by Ordiz Melby Architects. "Scheme A" consisted of cement plaster, manufactured stone veneer wainscot, and a standing seam roof with a color scheme that resembles shade structures recently assembled at City parks. "Scheme B" consisted of cement plaster, metal siding (horizontal and vertical orientation), and a standing seam roof with a color scheme to match Shafter High School colors. At the meeting, the Council discussed the options but requested additional time to consider them.

This staff report includes an assessment of Schemes "A" and "B," including the "Pros & Cons" of the material options summarized by Ordiz Melby Architects. Additional color renderings for each scheme have also been included to expand the options available for consideration and discussion.

ANALYSIS
To ensure the new building project is on track to be designed and constructed by next summer, Ordiz Melby Architects requests a determination on which building exterior to incorporate into the design.

FISCAL IMPACT
No budget action is required. The item is presented for discussion purposes only.

CEQA ANALYSIS
This item does not require discretionary action as it is for informational purposes only. Therefore, it does not trigger a CEQA review.

Page 386 of 494 ends

FINALIZE AQUATICS CENTER BUILDING ELEVATION DISCUSSION
- 2 -

APPROVED BY THE CITY ATTORNEY
Not Applicable

ALTERNATIVES
There are no alternatives to the recommended action. The item is presented for discussion purposes only.

NEXT STEPS
Following tonight's meeting, the Council's feedback will be used to update the design and develop biddable construction plans. Authorization to bid will be brought before the Council for approval at a future meeting.

ATTACHMENTS

1. Options for Scheme "A" - Manufactured Stone

2. Options for Scheme "B" - Metal Siding

3. Assessment of Buiding Exterior Options

Page 387 of 494 ends

Scheme “A” – Manufactured Stone

Page 388 of 494 ends

Scheme “B” – Metal Siding

Page 389 of 494 ends

2024 06 05
City of Shafter Aquatic Center Building
Exterior Elevation Materials – Pros & Cons
Scheme A
Exterior Materials:
• Cement plaster
• Manufactured stone veneer wainscot
• Standing seam roof
Scheme B
Exterior Materials:
• Cement plaster
• Metal siding (horizontal and vertical orientation)
• Standing seam roof
Cement plaster
Pros: common building material, strong, durable, uniform surface, repairability Cons: Application of cement plaster finish is a time-consuming process Manufactured stone veneer
Pros: Aesthetic value: creates the look of natural beauty on any exterior, rich spectrum of profiles and colors, provides durable protection, requires little maintenance.

Cons: Moisture problems can occur if stone veneer siding is not installed correctly, in terms of cost, manufactured stone veneer costs more than other siding options.

Metal siding panels
Pros: Eco-friendly, energy efficient, lightweight, durable, aesthetic value Cons: Not vandal proof, prone to scratches & dents, repairability Metal standing seam roofing
Pros: Easy to maintain, pest resistant, durable, aesthetics, environmentally friendly, resistant to fading and chalking with 30-year warranty product, Eco-friendly
Cons: Cost is one of the biggest disadvantages over other roofing materials such as asphalt shingles

Page 390 of 494 ends

MANAGEMENT REPORT

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: July 16, 2024
FROM: Gabriel A. Gonzalez, City Manager
PREPARED BY: Alex Gonzalez, Deputy Public Works Director SUBJECT: DISCUSSION ON POLICE SUBSTATION RENDERINGS

RECOMMENDATION
Council find this item does not require discretionary action as it for informational purposes only; discuss architectural renderings of the new Police Substation Building prepared by Teter, Inc.; and provide feedback on the renderings to staff.

BACKGROUND
Earlier this year, the Council authorized a professional services agreement award to TETER, Inc. ("Teter") for developing biddable construction plans for a Police Substation and City Offices building located off Seventh Standard Road near the Gossamer Grove development. Since then, Teter has worked closely with City staff on the building floorplan and amenities. Additionally, Teter has generated three (3) possible color pattern renderings for the exterior of the building, which have been included with this staff report for Council review and discussion.

ANALYSIS
Council feedback will be factored into the finalization of the design and plans released for bidding.

FISCAL IMPACT
No budget action is required. The item is presented for discussion purposes only.

CEQA ANALYSIS
This item does not require discretionary action as it is for informational purposes only. Therefore, it does not trigger a CEQA review.

APPROVED BY THE CITY ATTORNEY
Not Applicable

ALTERNATIVES
There are no alternatives to the recommended action. The item is presented for discussion purposes only.

NEXT STEPS

Page 391 of 494 ends

DISCUSSION ON POLICE SUBSTATION RENDERINGS
- 2 -
Following tonight's meeting, the Council's feedback will be used to update the design and develop biddable construction plans. Authorization to bid will be brought before the Council for approval at a future meeting.

ATTACHMENTS

1. Presentation - Sub Station Rendering Options (3)

Page 392 of 494 ends
Page 393 of 494 ends

MANAGEMENT REPORT

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: July 16, 2024
FROM: Gabriel A. Gonzalez, City Manager
PREPARED BY: Michael James, Public Works Director
SUBJECT: AWARD NORTH SHAFTER STREET IMPROVEMENTS
ENGINEERING SERVICES (CIP PROJECT NO. ST00022) TO
DIVERSIFIED PROJECT SERVICES INTERNATIONAL, INC.
(DPSI)

RECOMMENDATION
Council find the requested action is exempt from the California Environmental Quality Act; accept three (3) proposals received for the North Shafter Street Improvements Engineering Services project; approve one (1) proposal submitted by Diversified Project Services International, Inc. (DPSI); authorize an award of a professional services agreement for said project to DPSI for an amount not to exceed $400,000; and authorize the City Manager to execute said agreement on behalf of the City.

BACKGROUND
Last year, the City was awarded two grants to advance engineering and construction for street improvements within the communities of North Park and North Shafter ("North Shafter"). One grant focuses on designing and constructing sidewalk and bicycle lane improvements along southbound Highway 43 valued at $1,000,000. The funding source is the San Joaquin Air Pollution Control District Road Paving and Sidewalk Installations Program. The project was recommended by the Shafter AB 617 Steering Committee to address air quality improvement initiatives. The second grant will develop a master plan for modernizing the interior streets, specifically referred to as the "North Shafter Transportation Improvements and Sustainability Plan", valued at $205,000. The funding source is the Caltrans Sustainable Transportation Planning Grant Program. Both initiatives require engineering work that Public Works determined would be best provided by consultants, mostly to expedite the completion of the grantfunded projects.

At its February 6, 2024 meeting, the Council authorized the release of the North Shafter Street Improvements Engineering Services Request for Proposals (RFP) to procure one consultant for completing objectives for both grants. The RFP was later released and resulted in three proposals received. A ranking of the proposals based on scoring criteria established in the RFP is as follows:

Page 394 of 494 ends

AWARD NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES (CIP PROJECT NO. ST00022) TO DIVERSIFIED PROJECT SERVICES INTERNATIONAL, INC. (DPSI) - 2 -
Proposal Rank Proposal Score (Possible
100 Points)
Firm
1 93.0 Diversified Project Services
International, Inc. (DPSI)
2 92.8 Ruettgers & Schuler
3 83.0 KSI
Per State grant funding requirements, proposals are ranked based on qualifications, not on costs. However, a top-ranked firm is typically later asked to provide a cost proposal to ensure the project can be fully funded. In the case of this project, there was a virtual tie for the top-ranked proposals submitted by DPSI and Ruettgers & Schuler, so both were later asked to submit cost proposals.

The following is a summary of the cost proposals received from the top-ranked firms:

Objective
#
Description Ruettgers &
Schuler
DPSI Budget/Forecast
1 Construction Plans -
Sidewalk and Bicycle Lane
Improvements at Highway
43 $91,000 $209,991 $125,000
2 North Shafter
Transportation
Improvements and
Sustainability Plan
$185,000 $164,804 $205,000
Totals $276,000 $374,795 $330,000

ANALYSIS
For each of the two RFP objectives, Ruettgers & Schuler is proposing the lowest cost. However, after further reviewing and discussing all aspects of the proposals, including qualifications, schedules, costs, and work plans, Public Works has determined that DPSI's proposal best meets the City's needs. Among the strengths of their proposal are the community engagement plan and a comprehensive outlook for completing the objectives with special studies, including topography, drainage, and soils.

DPSI's cost proposal for Objective #1, construction plans for sidewalk and bicycle lane improvements at Highway 43, exceeds what was planned with the AB 617 grant for engineering. However, that grant totals $1,000,000, which still allows almost $800,000 for construction if DPSI's proposal is awarded. Secondly, the AB 617 grant can likely be increased if DPSI's future design suggests construction is underfunded. DPSI's cost

Page 395 of 494 ends

AWARD NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES (CIP PROJECT NO. ST00022) TO DIVERSIFIED PROJECT SERVICES INTERNATIONAL, INC. (DPSI) - 3 -
proposal for Objective #2, developing the North Shafter Transportation Improvements and Sustainability Plan, is well within the grant and local funding programmed in the Capital Improvement Program for this fiscal year.

An appropriate budget to cover DPSI's cost proposal plus at least 5% in contingencies is $400,000.

FISCAL IMPACT
Capital Improvement Program Project No. ST00022 currently has $1,205,000 in grants and local funds programmed to complete both objectives. Awarding DPSI's design proposal would leave approximately $805,000 in funding to complete the construction approved for grant funding, which is the sidewalk and bicycle lane improvements at Highway 43. The design work to be completed will determine if the funds available will be sufficient to cover this construction. At this time, no budget action is required.

CEQA ANALYSIS
The recommended action is considered a statutory exemption from the California Environmental Quality Act (Section 15262). The work to be awarded is focused on feasibility and planning studies that would lead to future actions to be approved at a later date.

APPROVED BY THE CITY ATTORNEY
Not Applicable

ALTERNATIVES
The Council could direct staff to award a professional services agreement to Ruettgers & Schuler rather than DPSI. The primary benefit of this alternative action would be reducing project costs by nearly $100,000. However, in the case of this RFP, DPSI submitted a more comprehensive proposal, highlighted by a better understanding of community engagement and a more comprehensive approach to the project overall, which staff feel will result in a better project outcome for the City. Therefore, alternative action is not recommended.

NEXT STEPS
Public Works will award a professional services agreement to DPSI and schedule a project kick-off meeting. Project updates, particularly ones involving community engagement, will be brought before the Council at future meetings.

ATTACHMENTS

1. DPSI Proposal

2. Budget Proposed by DPSI

3. Ruettgers & Schuler Proposal

4. Budget Proposed by Ruettgers & Schuler

Page 396 of 494 ends

CIVIL ENGINEERING | CONSTRUCTION MANAGEMENT | SURVEYING MECHANICAL ENGINEERING | MECHANICAL INTEGRITY

BAKERSFIELD

SAN LUIS OBISPO

LONG BEACH

NORTH SHAFTER STREET IMPROVEMENTS

ENGINEERING SERVICES

Page 397 of 494 ends

May 10, 2024
Michael James
City of Shafter
336 Pacific Avenue
Shafter, CA 93263
Subject: Request for Proposal | North Shafter Street Improvements Engineering Services

Dear Mr. James:

Thank you for the opportunity to submit our proposal package for the North Shafter Street Improvements Engineering Services Project. Diversified Project Services International, Inc. (DPSI) is a multi-disciplinary engineering firm that provides Civil and Mechanical Engineering, Land Surveying and Construction Management services for public and private clients.

DPSI prides itself on our track record of successfully managing complex and fast paced projects for our clients. We recognize the need for a proactive approach to each project, including open communication, cost and schedule management, quality control and an emphasis on safety. Our schedule-driven team of experts is dedicated to helping our clients reach their goals on time while optimizing cost and schedule.

We provide a multitude of services to public agencies throughout the Central Valley. Based on our dedication to integrity, our history of reliability and commitment to satisfying our clients’ needs, we believe that our firm is uniquely qualified to provide City of Shafter the engineering services requested in this solicitation.

Our Director of Civil Engineering, Samuel D. Lux, RCE, will serve as the primary point of contact for this work, and is authorized to negotiate and execute contracts on behalf of the company. He will oversee our talented team of engineers on all work requested by the City of Shafter.

We are excited about the opportunity and committed to meet the City’s needs. Please feel free to contact us with any questions regarding this RFP. Thank you for your consideration.

Sincerely,
Samuel D. Lux, RCE
Director of Civil Engineering
Diversified Project Services International, Inc.
5351 Olive Drive, Suite 100
Bakersfield, CA 93308
(661) 371-2800
[email protected]
NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 2

Page 398 of 494 ends

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 3 Table of Contents
Scope of Work & Associated Work Plan 4
Firm & Subconsultant Qualifications 10
Organizational Chart 11
Proposed Staffing Plan 12
Resumes 14
Project Experience 23
Financial Management & Accounting 25
References 26
Attachments
Required Forms
Subconsultant Resumes

Page 399 of 494 ends

Scope of Work and Associated Work Plan
OBJECTIVE 1
DPSI understands that the scope of work for the first objective of the project will be to design plans and specifications for construction level documents. These will be used to construct a series of pedestrian and bicycle improvements primarily along the west side of Highway 43 between Mayer Lane and Tulare Avenue. To complete this project, we will survey the project area, locate the existing right of way and all utilities and/or other potential conflict items, coordinate with Caltrans to obtain encroachment permits, design required drainage improvements, coordinate with adjacent property owners, geotechnical analysis for pavement design and consistently coordinate with City staff throughout the design process.

The main concerns for this project include:

1. The Caltrans permit process and potential unanticipated design changes, or additional project requirements, that will be required to obtain the necessary encroachment permits.

2. Utility conflicts and how those conflicts are resolved. If relocations are required construction of the project could be significantly delayed. Therefore, it will be vital to start work as soon as it is feasible and determine any conflicts that may be present.

3. Project drainage and Caltrans specific requirements and how it will affect the areas with the existing system and those that are currently dirt shoulders.

4. Right of way constraints throughout the project and how that will impact the desired area for future landscaping. Several locations within the project area appear to have improved into the project area, which may require property owner discussions on specific improvements.

OBJECTIVE 2
The development of a local community plan that will outline, identify, and rank infrastructure deficiencies of the local streets within the North Shafter area. The plan will include recommendations for remediating these deficiencies that are based on engineering observations, engineering studies and have been presented and vetted with the local community. Upon completion and approval of the plan by City Staff, the plan and findings will be presented to the City Council.

The main concerns for this objective include:

1. The restrictive right of way with in the plan area, and how any project could impact how the residents currently utilize the area for parking.

2. Low community response during the community outreach process. Community input into a plan like this is extremely important and a lack of participation will diminish the plans results. Therefore, during this process we will be proactive in our approach to ensure as much involvement as possible.

Objective 1: Plans for Constructing Sidewalk and Bicycle Lane Improvements at Highway 43 Task 1: As-Built Research, Investigation and Review
• As-Built and Utility Research
DPSI will obtain public improvement and utility as-built information from the City and respective utility companies. This information will be carefully compiled into an existing utility base to anticipate potential underground conflicts with the proposed sidewalks, bicycle lanes and design around them.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 4

Page 400 of 494 ends

Scope of Work and Associated Work Plan
(continued)
• Hydrology Study
DPSI will perform a hydrology study to determine how much potential surface water will accumulate due to the addition of the sidewalk and bicycle lanes. The results of the study will determine if there is a need for a sump to hold the water within the right of way. • Geotechnical Engineering Report
DPSI will contract with Soils Engineering, Inc. (SEI) to evaluate subsurface conditions and obtain soil samples for the geotechnical engineering report. SEI will provide roadway cores, analyze the subgrade materials, and produce an R-value. The R-value will be used to aide in the design process of the roadway section for tie-in purposes.

If it is determined that a sump will be needed to collect and store the water runoff from within the Caltrans right-of-way, then SEI will drill two to four shallow borings where the potential new sump will be located. Copies of the boring logs and a boring location map will be included in the report. Soil samples obtained from the borings will be tested in the laboratory to determine various engineering properties including grain size distribution, plasticity index, in-sit moisture and density, and maximum density at optimum moisture. The final numbers and types of tests to be performed will be determined based on the subsurface conditions encountered and geotechnical parameters required.

The field and laboratory data will be reviewed by a Registered Engineer and evaluated with respect to development of geotechnical criteria for the proposed project. The following items will be addressed:
• Subsurface conditions encountered
• Sump construction considerations
Task 2: Field Survey
• Topographic Survey
DPSI will perform a field survey to establish control and to be used as the basis for design work. The survey will be conducted within the existing right-of-way along southbound Highway 43 between Mayer Lane and Tulare Lane. Additional survey may be performed outside the right-of-way at driveway locations to allow for the proper grades to be designed for driveway tie-ins behind the sidewalk. The field work will include gathering survey points that have descriptions and elevations attached to them.

Among other points, the elevations at all storm drain inlets, surface evidence of any other utilities, and private improvements within the public right-of-way will be identified as part of the survey.

Task 3: Preliminary Engineering Design
• Preliminary Design Plans (30%)
Based upon the findings of the meetings, assessments, inspections, surveys, and the geotechnical report, DPSI will prepare the Preliminary Design for review and approval from the City. The preliminary design will include the following:
• Preliminary plan and profile sheets
• Existing utility information showing potential conflicts • Existing site topographic features
NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 5

Page 401 of 494 ends

Scope of Work and Associated Work Plan
(continued)
• Preliminary Plan Review Meeting
The City will have the opportunity to review the Preliminary Design submittal and provide comments at a review meeting. DPSI will document the meeting in the form of meeting minutes and develop an action items list, if applicable. A site visit can also be scheduled after the meeting to better illustrate any field conditions that require discussion.
• Begin Coordinating With Caltrans
After getting The City’s approval of the design layout, DPSI will begin coordinating with Caltrans. We will get feedback from Caltrans on the layout of the plans at the 30% stage. Coordinating with Caltrans at the early stages is the best way to keep potential costs down and conflicts from arising later on. Since the sidewalks and bicycles lanes are in their right-of-way, an encroachment permit will be required and they may not like the layout of the design. If it better to catch that early on before a full plan set is completed. DPSI will ensure both the City and Caltrans are happy with the layout before proceeding to a more detailed design.

Task 4: Final Engineering Design
• 60% Design Plans & Estimate
Based upon comments received from the Preliminary Design review meeting, DPSI will prepare 60% drawings.

The first draft of the Engineer’s Estimate will be provided with bid items listed to follow the bid form. Quantity calculations and/or breakdowns for unit pricing and/or lump sum bids (depending upon the requirements for a given portion of the scope) will be provided. If the cost estimate shows the potential for coming in under the project budget, DPSI will make recommendations for possible alternatives in order to maximize the returns for the budgeted project. Conversely, if the budget estimate appears that it will exceed the project budget, DPSI will work with the City to revise or limit scope in any areas where a cost savings could be realized. • 60% Review Meeting
Upon completion of the 60% plans and documents, DPSI will prepare for and attend a meeting with City staff to review the progress plans. The meeting will be documented in the form of meeting minutes and an action items list will be developed, if applicable.
• 90% Design Plans, Specifications, and Estimates
DPSI will prepare the 90% submittal which will incorporate all the City’s comments from the review of the 60% plans and estimate and will include the first submittal of the technical specifications for the project. The frontend specifications are to be provided by the City, and DPSI will modify these specifications as needed to fit the scope of this project.
• 90% Review Meeting
Upon completion of the 90% plans and documents, DPSI will prepare for and attend a meeting with City staff to review the progress plans. The meeting will be documented in the form of meeting minutes and an action items list will be developed, if applicable.
• 100% Design Plans, Specifications, and Estimates
DPSI will prepare the 100% submittal which will incorporate all the City’s comments from the review of the 90% submittal and will be a complete set of construction plans, specifications and bidding documents. All plans and documents will be properly stamped and signed and will be delivered as a complete set of bidding documents to the City for construction bid advertising.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 6

Page 402 of 494 ends

Scope of Work and Associated Work Plan
(continued)
• Caltrans Permitting
DPSI will either apply for the Caltrans encroachment permit on behalf of the City or provide the City all the necessary information for the City to submit to Caltrans, whichever the City prefers. DPSI has extensive experience with applying for Caltrans permits and knows the process well. We can help out in any way the City requests.

Task 5: Engineering Support for Bidding and Construction • Plan Interpretation and Bidding Assistance
DPSI will conduct, if required by the City, a pre-bid conference. Any engineering questions (RFIs) City receives during the bid process will be forwarded to DPSI to address. RFIs that require changes to the plans and specifications or other significant clarifications will be compiled into bid addenda for the City to publish. DPSI can assist with bid submission review and recommendations for award to the City. • Construction Support
During the construction phase of the project, DPSI will respond to all RFIs and Change Order requests, and make related recommendations to the City.

Task 6: Meetings and Reports
• Kick-Off Meeting
DPSI will schedule a kick-off meeting with City staff and the project manager to discuss the pertinent items and areas of concern prior to starting the project. Items to be discussed will include:
• Communication: A line of communication will be established for day-to-day communications, as well as for major design considerations and milestone submittals between DPSI and the City. • Project Schedule: The overall project schedule will be discussed in relation to the City’s requested timeline. After the kick-off meeting, DPSI will create the initial project schedule. This will be a living document and may be updated after each subsequent project meeting or as any modifications are required. Prior to formalizing any scheduled changes, DPSI will make sure to obtain agreement by all parties involved.
• Design Criteria: Any design criteria or concerns that the City staff may have specific to each area will be discussed.
• Project Recommendations: Prior to the kick-off meeting, DPSI will conduct an onsite assessment of the site. At the meeting, recommendations will be made to the City for the layout of the sidewalks and bicycle lanes.
• Topographic Survey Limits: The limits of the topographic survey will be discussed to determine if any additional areas are required.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 7

Page 403 of 494 ends

Scope of Work and Associated Work Plan
(continued)
• Meeting Minutes and Progress Reports
DPSI will prepare meeting minutes and monthly progress reports to be provided to the City throughout the design and bid phases.

Objective 2: North Shafter Transportation Improvements and Sustainability Plan Task 1: Meetings and Community Outreach
• Kick-Off and Monthly Progress Meetings
DPSI will schedule a kick-off meeting with City staff and the project manager to discuss the pertinent items and areas of concern prior to starting the project. Items to be discussed will include:
• Plan future public meeting
• Identify ROW constraints, drainage issues, and city access priorities • Identify specific outreach efforts
• DPSI will prepare meeting minutes and monthly progress reports to be provided to the City throughout the project.
• Community Outreach Efforts
For this objective DPSI believes our community outreach efforts should include the following:
• Development of community outreach material, including preparation of an interactive online GIS map dashboard and online survey.
• Neighborhood canvassing to distribute material and begin initial community contacts. Utilizing this effort to acquaint the community with the project and its objectives. • Hold, at minimum, one public meeting to present the project and its objectives, initial proposals, and receive public comment.
• Tabulate and analyze community responses and survey results.

Task 2: Studies
• Drainage Study
DPSI will prepare a drainage study for the North Shafter area. The study will evaluate existing drainage patterns and capacities, along with determining any improvements needed to satisfy existing conditions. The study will also evaluate the impacts of the final projects proposed in the final plan, and provide sizing criteria for new retention basins.
• Topographic Study
DPSI will evaluate the existing site topography as provided by the City, in addition to site visits to determine impacts of proposed improvements. The study will be used to establish existing drainage patterns, physical constraints within the right of way, and appropriate locations for future retention basins. • Pedestrian Study
DPSI will prepare a pedestrian study to determine how the public is utilizing the existing right of way to assist in the selection and ranking of the proposed improvements. The study will include pedestrian counts within the neighborhood.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 8

Page 404 of 494 ends

Scope of Work and Associated Work Plan
(continued)
Task 3: Preparation of Final Plan and Presentation
DPSI will prepare the final Transportation Improvements and Sustainability Plan for City staff’s review and approval. The plan will provide the results of tasks 1 and 2 described above along with rankings of the proposed improvements. Maps and schematics showing the locations and layout of the proposed improvements, along with any street design standards developed for this plan. Along with a list of projects we will include the cost estimates and potential grant sources associated with each proposed improvement. Upon approval by City staff DPSI will present the plan and its findings to the City Council in coordination with the City’s staff.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 9

Page 405 of 494 ends

Firm & Subconsultant Qualifications
DPSI is a California S Corporation and Certified Small Business founded in October 2007. Our headquarters are located in Bakersfield, with additional offices in both San Luis Obispo and Long Beach. The Bakersfield office is located at 5351 Olive Drive, Suite 100. We have a team of over 70 qualified professionals across our Engineering, Land Surveying, Mechanical Integrity and Administrative Departments. DPSI has evolved substantially since we first began working for the City. Over the past several years, we’ve focused our growth towards providing engineering, surveying, inspection, and construction services for public agencies. Public works clients are now our largest market. In just the past year, we have integrated two new registered civil engineers and two new civil designers with over 50 years of combined experience delivering public works projects.

DPSI is well-versed in handling and completing work for large-scale public works contracts. We currently perform or have recently completed significant work for the following public agencies: County of Kern, City of Porterville, Kern-Tulare Water District, City of Bakersfield, County of Santa Barbara, City of Paso Robles, City of Pismo Beach, Long Beach Water Department and more.

DPSI will partner with SEI (Soils Engineering, Inc.) to provide all geotechnical support required for this project. DPSI and SEI have successfully completed several projects in recent years.

The combination of our extensive in-house experience with the type and magnitude of work covered in this RFP, our local presence and our substantial public agency experience make this project very attractive to us.

The following proposal package highlights DPSI’s technical and managerial approach to projects of this type, as well as our specific team and strategy for your particular project. We strongly believe that this approach, combined with the applied experience and knowledge of our staff, are an excellent fit for the work described in the RFP.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 10

Page 406 of 494 ends

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 11 City of Shafter
Oscar Carrillo, PLS
Chief Land Surveyor
Samuel D. Lux, RCE
Director of Civil Engineering
Principal in Charge
Survey Field Crews
Scott Radsick, RCE
Senior Engineer
Jesse Kaltenberg, RCE QSD/P
Senior Engineer
Alexa Kolosky, AICP
Planner
Project Support Staff
On Man Lau, P.E.

Soils Engineering, Inc.

Geotechnical Engineer
Organization Chart
Please refer to the organization chart and resumes for detailed information on the principles, key staff and subconsultants who will be performing the work.

Page 407 of 494 ends

Proposed Staffing Plan
NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 12

We strongly believe our firm’s experience, combined with the applied knowledge of our staff, are an excellent fit for the roles and responsibilities described in the Request for Proposals.

Samuel D. Lux, RCE, Director of Civil Engineering
Mr. Lux has over 20 years of experience working on a variety of civil engineering projects ranging from multimillion-dollar grade separations to bike and pedestrian paths to commercial and residential developments. As the previous public works director for the County of Kern, he has gained a wide-rage of experience within the field of civil engineering. He has completed the Resident Engineers Academy through the California Local Technical Assistance Program, and he has an extensive background working on public works projects administered per the Caltrans methods and procedures in accordance with the Local Assistance Procedure Manual. Mr. Lux’s professional strengths and key areas of expertise include project management, construction support services, quality assurance/quality control, design, and preparation of specifications, bid documents, and cost estimates. He will serve as the project manager of this project.

Scott Radsick, RCE, Senior Engineer
Mr. Radsick’s civil engineering experience spans over 13 years. He has undertaken a diverse array of roles such as being a resident engineer in construction, design engineer, engineering manager, and assistant public works director for the County of Kern. Serving as a resident engineer and engineering manager over construction, he oversaw the construction of buildings and sewer digesters, road reconstruction projects, bike and pedestrian paths, airport runway and taxiway improvements, traffic signals, and sewer trunk-lines and laterals. Mr. Radsick assumed leadership of the Transportation Division. In this capacity, he held comprehensive responsibilities, which encompassed the maintenance of over 3,300 lane miles of County roads, the management of the Kern Transit bus system, supervision of traffic engineering activities, oversight of road permits, management of the central shop and fleet services, and stewardship of advanced planning and right of way matters. Scott will act as an Assistant Project Manager for this project.

Jesse Kaltenberg, RCE/QSD/P
Mr. Kaltenberg has over 14 years of experience working on a variety of projects ranging from multimillion-dollar freeway widenings to commercial and industrial site design. He has wide-ranging experience with many aspects of civil engineering design, including plan and profile, grading, drainage, traffic signals and utility relocations. His duties and responsibilities include providing responsible charge in the development of plans, specifications and estimates for infrastructure projects.

Alexa Kolosky, AICP
Ms. Kolosky brings to the table 9 years of experience in local government planning from the County of Kern, where she occupied a variety of increasingly responsible roles, including: Planning Technician, Planner, Supervising Planner, and Public Works Manager. Ms. Kolosky has an extensive background in public works construction and direct experience in public outreach in support of Capital Improvement Projects.

Page 408 of 494 ends

Proposed Staffing Plan (continued)
NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 13

Oscar Carrillo, PLS
Mr. Carrillo has over 22 years of experience as a surveyor. He is proficient in the use of RTK GPS equipment and robotic total stations, which allows him to efficiently collect and process survey data in the field and office. Mr. Carrillo is also the lead project manager for all 3D laser scanning projects and drone projects, as well as multiple oilfield projects and various construction-staking projects. He will allocate 25% of his time to all City of Shafter projects awarded.

On Man Lau, PE, GE, Soils Engineering, Inc.

Mr. Lau has more than 30 years of experience in geotechnical engineering, soils/earthwork observation and testing, and construction materials testing and inspection. His areas of expertise include: Investigations for foundations, seismic hazards, slope stability, liquefaction analyses, drainage studies, footing foundation designs, settlement evaluations, pavement designs, slab-on-grade design, drilled pier design and construction, pile driving design and construction, expansive soils, corrosive soils, excavation stability, shoring, compaction requirements and volumetric calculations.

Page 409 of 494 ends

Samuel D. Lux, RCE
Director of Civil Engineering
Mr. Lux has over 20 years of experience working on a variety of civil engineering projects ranging from multimillion-dollar grade separations, from bike and pedestrian paths, to commercial and residential development. Working for a private engineering firm in Tehachapi and as an engineering manager, assistant public works director, and public works director for the County of Kern, he gained a wide range of experience within the field of civil engineering. His duties and responsibilities include providing responsible charge in the development of plans, specifications and estimates, and construction management for infrastructure projects.

Public Works, Kern County, California
During his tenure with the Kern County Public Works Department, Mr. Lux was responsible for the planning, design, and construction of infrastructure projects within the County right of way and at department facilities. As a designer, Mr. Lux worked on numerous projects including traffic signals, for bike and

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES
State of California
Licensed Civil Engineer
C77460
Bachelor of Science
Civil Engineering
University of North Dakota

CREDENTIALS
pedestrian paths, road reconstruction and realignments, pavement rehabilitation projects, and complete street projects including solar lighting and pedestrian crossing improvements. Acting as a Resident Engineer or Assistant Resident Engineer, Mr. Lux worked on projects including grade separations, traffic signals, road reconstruction, runway and taxiway improvements, drainage improvements, and installations of sewer trunk-lines and laterals.

Throughout his time with the department, he was directly responsible for and provided oversight for the federal and state funding process. Beginning with the initial project selection, grant preparation and submittal, obtaining all necessary clearances and authorizations, design, construction, invoicing and project closeout. Working with Caltrans Local Assistance, he established a program for local agencies to utilize County staff to deliver their federal and state funded projects.

Kern River Bike Path Extension, Kern County, California The project extended the Kern River Parkway Bike Trail from its terminus at State Route 43 to the Buena Vista Aquatic Recreational Area. The approximately 6.3 miles of new paved Class I bike path provided bicyclists a complete route from Lake Ming to Buena Vista Lake covering over 30 miles of trail. As the design manager, Mr. Lux was responsible for project management of consultants, providing engineering direction throughout the design and construction process.

Lake Ming Bike Path, Kern County, California
The project connected to the Kern River Bike Path at Lake Ming and provided a complete loop around the Lake. As the lead Civil Engineer for the project, Mr. Lux ensured that the necessary plans and specifications, along with quantities, and bidding documents were completed on time and within budget.

Rowlee Road Reconstruction, Kern County, California
The rehabilitation project involved an analysis of the existing pavement conditions utilizing site visits and pavement coring. The federally funded project included approximately three miles of areas of full reconstruction, pavement overlay and paved shoulders. Mr. Lux was the lead engineer on this project responsible for the design and preparation of documentation for authorization of federal funding. 14 Resumes

Page 410 of 494 ends

Samuel D. Lux, RCE
Antelope Run Multi-Use Path, Tehachapi, California
The project was located in the City of Tehachapi and was designed to provide a North-South connection between Tehachapi Boulevard shopping centers and the neighborhoods East of Tucker Road. The project consisted of approximately two miles of Class I bike path and tied into a multi-use path on Tehachapi Boulevard and a Class I bike path on W Valley Blvd. Mr. Lux was the lead engineer responsible for the design and construction of this federally funded project (TEA funding).

Diamond Street Beautification, Kern County, California
This project was a federal, state, and local funded project, which incorporated complete street elements to make intersection improvements to increase the overall safety for the pedestrians and vehicles utilizing the facilities. The project provided solar lighting, decorative colored stamped concrete crosswalks and pedestrian ADA improvements, along with pavement improvements to provide better visibility. As the lead Civil Engineer for the project, Mr. Lux ensured that the necessary plans and specifications, along with quantities, and bidding documents were completed on time and within budget.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 15

Page 411 of 494 ends

Scott Radsick, RCE
Senior Engineer
Mr. Radsick boasts an extensive career spanning over 13 years, marked by substantial contributions to diverse Civil Engineering initiatives. His professional journey encompasses hands-on involvement in the planning and execution phases of projects including bike and pedestrian path development, traffic signal installations, roadway enhancements, sewer line replacements, sewer digester facilities and airport runway rehabilitations. These projects have covered a broad spectrum in terms of both scale and complexity, ranging from projects with budgets as modest as $50,000 to multimillion-dollar projects. His career trajectory has seen him occupy pivotal roles including engineer, supervising engineer, engineering manager, and assistant public works director, each of which has enriched his proficiency within the field of civil engineering. His responsibilities have encompassed a wide array of duties, such as orchestrating grant application processes, delivering effective construction management oversight, and developing comprehensive plans, specifications and estimates for various infrastructure projects.

Public Works, Kern County, California

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES
State of California
Licensed Civil Engineer
C86436
Bachelor of Science
Civil Engineering
CSU Fresno

CREDENTIALS
Elevating his role to an Assistant Public Works Director, Mr. Radsick assumed leadership of the Transportation Division. In this capacity, he held comprehensive responsibilities, which encompassed the maintenance of over 3,300 lane miles of County roads, the management of the Kern Transit bus system, supervision of traffic engineering activities, oversight of road permits, management of the central shop and fleet services, and stewardship of advanced planning and right of way matters. Mr. Radsick oversaw a workforce of approximately 180 dedicated employees during his tenure.

Rowlee Road Reconstruction, Kern County, California
The rehabilitation project involved an analysis of the existing pavement conditions utilizing site visits and pavement coring. The federally funded RSTP and CMAQ project included approximately three miles of areas of full reconstruction, pavement overlay and paved shoulders. He was the design engineer on this project and produced the plans and specifications for it to go out to bid. Mr. Radsick also was responsible for the preparation of documentation for authorization of federal funding.

State Route 14 Pedestrian Path, Kern County, California This ATP project funded through the Caltrans Active Transportation Program was located in the unincorporated town of Mojave. The goal was to improve safe walking conditions for pedestrians to a nearby shopping center. He was the lead engineer on this project responsible for the production of plans and specification used for construction. This was within the Caltrans right of way requiring extensive coordination to complete the project. Mr. Radsick was required to follow the federal funding procedures as well as the Caltrans permitting guidelines. The new infrastructure installed includes curb and gutter, sidewalk, ADA curb ramps, drive approaches, streetlights, and striping. The completed project provided increased safety, increased physical activity, provided mobility options and access for non-drivers and disabled persons, and decreased vehicle trips and collisions. 16

Page 412 of 494 ends

Scott Radsick, RCE
Snow Road Traffic Signals, Kern County, California
This was a Congestion Mitigation and Air Quality Improvement (CMAQ) grant funded project to install traffic signals at two locations on Snow Road in the unincorporated area of Kern County. The two locations were at the cross street of Calloway Drive and Coffee Road. Drainage was a key issue at the Calloway Drive location. Mr. Radsick performed a hydrology study and designed a sump to solve the issue. He was the design engineer on this project, producing the plans and specifications prior to sending out for bid. He was also responsible for the preparation of documentation for authorization of federal funding.

Kern River Bike Path Extension, Kern County, California The federally funded project extended the Kern River Parkway Bike Trail from its terminus at State Route 43 to the Buena Vista Aquatic Recreational Area. The approximately 6.3 miles of new paved Class I Bike path provided bicyclists a complete route from Lake Ming to Buena Vista Lake covering over 30 miles of trail. As the construction manager, Mr. Radsick oversaw the project’s construction to ensure adherence to plans and specifications while maintaining budgetary constraints.

Twisselman Road Reconstruction, Kern County, California The project was located in the unincorporated area of Kern County in North of Lost Hills. The existing roadway would often close during storms due to flooding. The roadway followed the existing terrain and contained several low spots. This project reconfigured the roadway and raised it in several locations by 10+ feet to make it a smoother and safer drive. Mr. Radsick was the resident engineer in charge during the construction of the roadway. Cement treated base was used in lieu of the poor existing soil. Multiple large culverts were installed to alleviate the drainage issues. The project was built per the plans and specifications and was completed under budget.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 17

Page 413 of 494 ends

Jesse Kaltenberg, RCE, QSD/P
Senior Engineer
Mr. Kaltenberg has over 14 years of experience working on a variety of projects ranging from multi-million-dollar freeway widenings to commercial and industrial site design. He has wide-ranging experience with many aspects of civil engineering design, including plan and profile, grading, drainage, traffic signals and utility relocations. His duties and responsibilities include providing responsible charge in the development of plans, specifications and estimates for infrastructure projects.

Drainage Repair Project PS&E, Paso Robles, California
DPSI was awarded a contract with the City of Paso Robles to prepare construction documents for drainage system repairs at six sites throughout the City. Initially, DPSI assisted the City by recommending solutions and budgets, and subsequently, DPSI was awarded the design work also. The sites required various repairs due to erosion, drainage structure damages, other issues, and on-site requiring intensive environmental coordination. DPSI also provided land surveying services, hydraulic calculations, geotechnical analysis and engineer estimates. Mr. Kaltenberg was the project manager and lead engineer on this project and had responsible charge of all project deliverables.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES
State of California
Licensed Civil Engineer
C80031
Bachelor of Science
Civil Engineering
University of Arizona

CREDENTIALS
Bello and Wadsworth Water Mains, PS&E, Pismo Beach, California DPSI was awarded a contract with the City of Pismo Beach to prepare construction documents for the abandonment and replacement of existing water main lines. The upsizing of the new lines will improve fire flows in the downtown area, provide water distribution service along Bello Street, and fill the City’s reservoir.

In addition to engineering design, services include providing as-built utility mapping, topographic survey, engineer’s estimates, and engineering support for bidding and construction. Mr. Kaltenberg is the project manager and lead engineer on this project and has responsible charge of all project deliverables.

Pismo Beach Storm Drain Repair Project PS&E, Pismo Beach, California DPSI was awarded the project for storm drain infrastructure repairs on Encanto Avenue (outfall repair), Reef Court (inlet and piping construction), and Windward Avenue (inlet and piping construction) in the City of Pismo Beach. DPSI provided the initial topographic survey which informed our creation of plans and specifications for the project. DPSI currently serves as the construction manager and administrator as this project undergoes construction. Mr. Kaltenberg served as the lead civil engineer and provided the design, specifications, and engineer’s estimate for this project.

Calle Real Campus Water Main System PS&E, Santa Barbara, California DPSI has been awarded a two-phased contract with the County of Santa Barbara to upgrade the Calle Real Campus water distribution system. This includes improvements to the existing water main system (in the short term) and design of a new water main loop (in the long term). In addition to complete design services, DPSI will also oversee construction administration and inspection once each phase of the project is under construction. Mr. Kaltenberg is the project manager and lead engineer on this project and is in charge of all communication between the County and DPSI. 18

Page 414 of 494 ends

Jesse Kaltenberg, RCE, QSD/P
Crenshaw Boulevard Pavement Rehabilitation PS&E, Torrance, California This project rehabilitated approximately 2,500 feet of pavement from 182nd St to 190th St, along a 6-lane stretch of Crenshaw Boulevard in Torrance, California. Improvements included sections of full pavement replacement and grind and overlay. Additionally, curb and gutter was replaced where ponding was an issue. Mr. Kaltenberg was responsible for the design of project plans and estimates.

Durfee Avenue Grade Separation PS&E, Pico Rivera, California The Durfee Avenue project involved the grade separation of Durfee Avenue from the UPRR at-grade crossing in Pico Rivera, California. Due to the imminent need for pedestrian safety and traffic delay improvements along the corridor, this project was fast-tracked by Alameda Corridor-East Construction Authority. Mr. Kaltenberg was responsible for horizontal and vertical design of the corridor, along with storm drain plan and profile and developing plans for Los Angeles County Sanitation District on the relocation of a 15” trunk sewer line.

Van Buren Boulevard Widening PS&E, Riverside, California The project consisted of the widening of Van Buren Boulevard from four lanes to six lanes along a 1.6 mile stretch from Jackson Street to the Santa Ana River bridge, including new landscaped medians, curb ramps, sidewalks, traffic signals and private property improvements along the corridor. Mr. Kaltenberg was responsible for horizontal and vertical design for a number of portions of the project as well as calculations for an engineer’s estimate.

Lantern District Redevelopment PS&E, Dana Point, California This project modified the Pacific Coast Highway (PCH) couplet, through downtown Dana Point, California, from one-way to two-way operation. Redesign of the southbound portion (Del Prado Avenue) into a reduced-width, bike and pedestrian-friendly corridor allowed better access to shops and restaurants. Mr.

Kaltenberg was responsible for the design or re-design of nine traffic signals along both PCH and Del Prado, as well as ancillary civil improvements along the corridor.

La Rue Street Improvements PS&E, Riverside County, California This project was implemented to improve ADA access and drainage conditions along La Rue Street from Mustang Lane and continuing north to La Canada Street, in the unincorporated community of Rubidoux.

This project included construction of new infill sidewalks, curb and gutter improvements along both east and west sides of La Rue Street, railroad crossing improvements, and pavement rehabilitation on both La Rue and Mustang Lane. Mr. Kaltenberg was responsible for the design of project plans and engineer’s estimates.

Rosecrans Avenue Widening PS&, Manhattan Beach, California As the last improvements needed to complete the full-width section of Rosecrans Avenue, this project widened a 500-foot stretch of Rosecrans Avenue from Redondo Avenue to Manhattan Gateway.

Improvements included adding a dedicated right-turn lane into the Manhattan Gateway shopping center, adding catch basins and coordinating the undergrounding of Southern California Edison transmission lines. Mr. Kaltenberg was responsible for the design of roadway, drainage and traffic signal modification plans and the project cost estimate.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 19

Page 415 of 494 ends

Alexa Kolosky, AICP
Planner
Ms. Kolosky brings to the table 9 years of experience in local government planning from the County of Kern, where she occupied a variety of increasingly responsible roles, including: Planning Technician, Planner, Supervising Planner, and Public Works Manager.

During her tenure, she was employed as a land use planner for the Planning Department, where she gained expertise in processing CEQA environmental documents as the lead agency and preparing and presenting discretionary land use cases at Kern County public hearings.

As a planner with the Public Works Department, Ms. Kolosky’s duties involved transportation and environmental planning. She was responsible for creating transportation plans, identifying needed roadway and active transportation facility improvements, prioritizing improvements by greatest need, applying for grant funding, and successfully processing CEQA & NEPA environmental documentation for funded projects through California Department of Transportation, Division of Local Assistance.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES
AICP No. 32427
Bachelor of Arts
Sociology
California State University
of Bakersfield

CREDENTIALS
Between 2018-2023, she oversaw dozens of federal and state funded roadway, pedestrian, and cyclist safety projects successfully delivered for the Public Works Department through varied grant funding sources, such as Active Transportation Program (ATP), Congestion Mitigation Air Quality (CMAQ), Regional Surface Transportation Program (RSTP), Highway Safety Improvement Program (HSIP), Urban Greening, and Federal Emergency Management Agency (FEMA). She is well-versed in the process of weighing community requests with local government funding limitations and prioritizing requested improvements to benefit populations with the greatest need. She has an intimate understanding of the grant funding opportunities available in the transportation sector, as well as the innovative planning and community engagement strategies necessary to be competitive in obtaining grant funding.

Ms. Kolosky is proficient in creatively planning and bridging pedestrian and bicycle network gaps in areas with limited right-of-way to connect historically isolated communities to vital services. She has a wealth of relevant experience to successfully accomplish the proposed project, with lead roles in the below projects.

Kern County Unmet Transportation Needs Report (2019-2021) The Public Works Department’s Unmet Transportation Needs Report project involved compiling community roadway improvement requests with pavement condition survey results to prioritize lists of varied roadway improvement projects. This included roadway reconstruction, resurfacing, sidewalk, and bicycle lane improvements. Several factors were considered in the ranking of improvements, including factoring annual average daily traffic, roadway designation, neighborhood population, traffic collision history, disadvantaged community severity, potential grant funding applicability and competitiveness, number and nature of community requests, and proximity to local services including schools, stores, and bus stops. This plan identified and prioritized over 25 years’ worth of improvements needed to Kern County roadways and proposed a long-range improvement schedule. 20

Page 416 of 494 ends

Alexa Kolosky, AICP
Kern County Local Roadway Safety Plan (2018-2019)
Ms. Kolosky prepared the Public Works Department’s HSIP-required Local Roadway Safety Plan (LRSP), which involved establishing a planning committee comprised of local community stakeholders and soliciting feedback. This was completed by creating and disseminating digital surveys, analyzing responses, identifying and prioritizing requested roadway safety improvement opportunities, compiling regional collision statistics, proposing regional roadway safety goals, and proposing strategies moving forward to accomplish safety goals.

South Chester Avenue Pedestrian Safety Project
Active Transportation Program, State-Funded, $1.97 Million: (2018-2023) The grant writer and environmental project manager for the successful ATP project funded by the California Department of Transportation, Ms. Kolosky’s 2018 grant application ranked no. 2 out of 50 applications funded in the Cycle 4 statewide competitive program of projects. Originally a project identified in the Kern County Unmet Transportation Needs Report, this project constructed missing sidewalk gaps, a new pedestrian railroad crossing, ADA-compliant curb ramps, rapid flashing beacons, street lighting, and high-visibility crosswalk markings at unprotected crosswalks along South Chester Avenue, a highly disadvantaged community within unincorporated South Bakersfield. Public participation leveraged existing school partnerships to deploy an online, tablet-based survey to over 900 students and parents during the school year to solicit feedback on needed pedestrian and cyclist safety infrastructure. The completed project increased safety, increased physical activity, provided mobility options and access for non-drivers and disabled persons, and decreased vehicle trips and collisions.

Mt Vernon Elementary Pedestrian Safety Project
Congressional Community Project Funding, Federal-Funded, $4 Million: (2019-Current) She is the grant writer for the successful $4 million community project funding grant application, the project scope involves the construction of sidewalks, median improvements, and crosswalk safety upgrades. This will improve the safety for students and families walking to schools, bus stops, and other necessary services along Mt. Vernon Avenue and Potomac Avenue, a highly disadvantaged community within unincorporated East Bakersfield. Ms. Kolosky’s innovative and versatile public outreach campaign for this project established a planning committee with local parents and community stakeholders, engaged hundreds of students in the transportation planning process, held walk audits, community meetings, and safety trainings, employed community members to conduct pedestrian counts, and facilitated virtual public engagement. This was achieved by deploying online surveys and an interactive GIS map which allowed members of the public to drop pins to identify areas in need of roadway and active transportation improvements.

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 21

Page 417 of 494 ends

State of California
Licensed Land Surveyor
#8147
Bachelor of Science
Survey Engineering
CSU Fresno
Oscar Carrillo, PLS
Senior Land Surveyor
Mr. Carrillo has over 22 years of experience as a surveyor. He is proficient in the use of RTK GPS equipment and robotic total stations, which allows him to efficiently collect and process survey data in the field and office. Mr. Carrillo is also the lead project manager for all 3D laser scanning projects, as well as multiple oilfield projects and various construction-staking projects.

Kern River Bike Trail Extension, Bakersfield, California The Kern County Public Works Department requested DPSI’s assistance with surveying services for the Kern River bike trail extension project. DSPI provided quality control checks on existing survey completed by outside sources and established additional project survey control. Staking was provided at 100-foot intervals and was offset to the side of the bike pathway. Mr. Carrillo oversaw topographic mapping, right of way acquisition and construction staking for this project with coordination with both the County of Kern and City of Bakersfield.

KTUA Planning & Landscape Architecture, Bakersfield, California Under Mr. Carrillo’s supervision, DPSI provided topographic services for the

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES

CREDENTIALS
Buena Vista Aquatic Recreation Area Improvement Project. The survey was used for the design of the multi-use trail along the north of the park, a new splash pad with accessible features, a picnic pavilion with a shade structure and a fenced dog park area and four floating boat docks with upgraded lake edge erosion control.

CSUB Student Recreation Center, Bakersfield, California Mr. Carrillo established control and topographic survey of the CSUB Student Recreation Center in Bakersfield. He was also in charge of the construction staking of the new building and site work.

Pedestrian VIP, Kern County, California
Kern County Public Works requested land-surveying services for 18 street intersections. Mr. Carrillo established topographic line work, right of way lines and centerlines of numerous geographic locations of pedestrian roads in Kern County. The data collected included signs, mailboxes and utilities along the roads. Monuments and control points were established prior to construction. DPSI also provided survey support during construction, providing stationing and elevations. Final deliverable included topographic line work right of way lines and centerline stationing.

PG&E Trilobite Solar Project, San Bernardino, California Mr. Carrillo was the lead party chief in performing a record of survey for 10 sections, approximately 6,400 acres, to set property corners for a solar installation. Aerial panels were produced for the topographic survey control points. Oscar collected all data in the field, and produced the deliverable of map and boundary resolution, as well as provided drafting for all of the easement exclusions.

Robertson Road, Modesto, California
Mr. Carrillo was involved in the process of collecting topographic and boundary surveys data using GPS and Total Station for the County of Merced. The county was performing street improvements to include storm drains and installation of sidewalks. Oscar was also involved in writing the legal descriptions for the right of way takes.
22

Page 418 of 494 ends

Project Experience
NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 23 DPSI was awarded a contract with Kern County Public Works to prepare improvement plans for pedestrian routes to Jefferson Elementary School along six streets in the Ford City-Taft Heights community. The improvements include expanded paved roadways, pedestrian crossings, curbs, gutters, ramps, sidewalks, striping and signage, street lighting, drainage structures, and relocation of existing street features as needed. Crosswalk improvements for four intersections will also be designed. DPSI is providing a hydrology study to determine the necessary drainage system improvements. Services being provided also include preparation of construction specifications to County and Caltrans standards and construction support.

FORD CITY-TAFT HEIGHTS PEDESTRIAN PATH

KERN COUNTY, CALIFORNIA
Client: Kern County Public Works
Client Contact: Jeff Davis, 661-862-8895
Contract Value: $199,900
Project Timeline: September 2023-present
Kern County Public Works has contracted DPSI to provide civil engineering services for design of pedestrian pathways in the unincorporated area of Rexland Acres. DPSI will prepare pedestrian improvement plans focusing on the pedestrian routes to Fairview Elementary School. The scope of work includes expanding the paved roads, pedestrian crossings, curbs, gutters, ramps and sidewalks, striping and signage, street lighting, drainage structures, relocation of driveway approaches, and new or relocated bus stops. DPSI will provide a hydrology study, on-site improvement plan set, technical specifications, engineer estimate and construction support.

REXLAND ACRES PEDESTRIAN PATH

KERN COUNTY, CALIFORNIA
Client: Kern County Public Works
Client contact: Jeff Davis, 661-862-8895
Contract Value: $199,600
Project Timeline: September 2023-present

Page 419 of 494 ends

Project Experience (continued)
NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 24 DPSI provides on-going land surveying and civil engineering services for the Entrada de Paso Robles site located off of State Highway 46 East in Paso Robles. The 400-acre development currently includes the Sensorio immersive light and art outdoor exhibits, along with an event lawn, VIP area and market building. The scope of services we are providing include topographic and boundary surveys, construction staking, grading and drainage plans, sewer and water plans (including a reclaimed water system and sewer lift stations), and other site improvement. DPSI is designing all of the pathways and walkways per ADA standards, the roadway alignment and approaches to Dry Creek Bridge, and redesign the slope and added drainage to the Caltrans right of way.

ENTRADA DE PASO ROBLES

PASO ROBLES, CALIFORNIA
Client: Entrada de Paso Robles, LLC
Client Contact: Ken Hunter, 661-616-0600
Contract Value: $2,000,000 (ongoing)
Project Timeline: November 2018-present

ADDITIONAL STATE AND FEDERALLY FUNDED PROJECTS -
Mr. Samuel D. Lux has completed work on the following state and federal projects while working at Kern County Public Works, he was the lead engineer responsible for design and construction:

Rexland Acres ATP, Kern County, California
Client: Kern County Public Works
Client Contact: Jeff Davis, 661-862-8895, [email protected] 2700 M Street, Ste. 400, Bakersfield, CA 93301
Project Timeline: 2020-2021
This was a grant funded ATP safe routes to school project. It was the largest grant the County of Kern has received. The project was located in the unincorporated area of Kern County in Southeast Bakersfield.

Main roads needed to provide a direct route to Fairview Elementary School for sidewalks along with Price Street, which had high numbers of collisions near a school bus stop. Mr. Lux was the lead engineer on this project responsible for the design and construction. New infrastructure included: four miles of sidewalks,

5.3 miles bike lanes/routes, 66 ADA curb ramps, 75 new traffic signs, 11 flashing stop signs, 19 ladder-style crosswalks, six new street lights, and three new 4-way stops.

Page 420 of 494 ends

Project Experience (continued)
NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 25 Lamont Pedestrian Improvement Project ATP, Kern County, California Client: Kern County Public Works
Client Contact: Jeff Davis, 661-862-8895, [email protected] 2700 M Street, Ste. 400, Bakersfield, CA 93301
Project Timeline: 2014-2018
This ATP project was funded through the Caltrans Active Transportation Program. The goal was to improve walking and biking conditions for pedestrians. Safety for the community and children walking to school. Mr. Lux was the lead engineer on this project responsible for the design and construction. New infrastructure took place on various streets in Lamont. This resulted in increased safety, increased physical activity, mobility options and access for non-drivers and disabled persons, and decreased vehicle trips and collisions.

Antelope Run Multi-Use Path, Kern County, California
Client: Kern County Public Works
Client Contact: Jeff Davis, 661-862-8895, [email protected] 2700 M Street, Ste. 400, Bakersfield, CA 93301
Project Timeline: 2020-2022
The project was located in the City of Tehachapi and was designed to provide a North-South connection between Tehachapi Boulevard shopping centers and the neighborhoods East of Tucker Road. The project consisted of approximately 2 miles of Class I bike path and tied into a multi-use path on Tehachapi Boulevard and a Class I bike path on West Valley Blvd. Mr. Lux was the lead engineer responsible for the design and construction of this federally funded project (TEA funding).

DPSI is experienced working on federally funded projects and can furnish all forms required. Our Caltrans Acceptance ID for fiscal year 1/1/2022-12/31/2022 is L2024-1824.

Financial Management & Accounting

Page 421 of 494 ends

References
NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 26 County of Kern
Contacts: Jeff Davis, Senior Engineering Manager
Address: 2700 M Street, Ste. 400, Bakersfield, CA 93301 Phone: 661-862-8895
Projects
• On Call Engineering Services ($2,000,000; February 2024-present) • CSA-71 Sewer Trunk Lines ($312,553; November 2022-present) • Ford City-Taft Heights Pedestrian Pathways ($199,900; September 2023-present) County of Santa Barbara
Contacts: Darrell Goo, Project Manager
Address: 105 E Anapamu Street, Santa Barbara, CA 93101
Phone: 805-234-4328
Projects
• Calle Real Water Main Improvements ($217,970; July 2021-present) • On-Call Monument Perpetuation Services ($300,000+; July 2018-present) • Tajiguas Sanitary Landfill Civil, Survey & CM ($211,470; May 2018-January 2020) City of Paso Robles
Contact: Dave LaCaro, Interim Public Works Operations Manager Address: 1000 Spring Street, Paso Robles, CA 93446
Phone: 805-227-7241
Projects
• Citywide Drainage Improvements ($180,250; September 2022-present) • Citywide Drainage Improvements ($50,360; April 2020-September 2021) City of Pismo Beach
Contact: Eric Eldridge, Engineering Manager
Address: 760 Mattie Road, Pismo Beach, CA 93449
Phone: 805-773-7041
Projects
• Storm Drain Repair Project ($170,699; October 2020-April 2022) • Bello and Wadsworth Water Main Replacement ($166,375; January 2024-present) • Pismo Creek Crossing - Emergency Survey ($11,000; August-September 2021)

Page 422 of 494 ends

NORTH SHAFTER STREET IMPROVEMENTS ENGINEERING SERVICES 27 Addenda Acknowledgement
DPSI acknowledges addendum 1-4.

Attachments to Follow

Page 423 of 494 ends
Page 45 of 51 ends

DIR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to propose on, be listed in a proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public-Works/PublicWorks.html for additional information.

No proposal will be accepted, nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. This requirement will apply to all work under this RFP that is subject to the prevailing wage requirements set forth in Labor Code section 1720, et. seq., (“Prevailing Wage Work”) and to proposer and any subcontractor proposed to perform such work.

Offeror hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations.

Name of Proposer: _____________________________________ DIR Registration Number: ______________________________ *Name of Proposed Subcontractor: ____________________________ DIR Registration Number: __________________________________ *Include additional sheets as necessary to list additional proposed subcontractors who will perform Prevailing Wage Work, and DIR registration numbers.

Offeror further acknowledges:

1. Offeror shall maintain a current DIR registration for the duration of the project.

2. Offeror shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its contract(s) with subcontractors engaged to perform any Prevailing Wage Work, and shall ensure that all such subcontractors are registered at the time of proposal opening and maintain registration status for the duration of the project.

3. Failure to submit this form or comply with any of the above requirements may result in a finding that the proposal is non-responsive.

Signature: ______________________________________________ Name and Title: ____________________________________________ Dated:______________________________________________________

Page 424 of 494 ends
Page 46 of 51 ends

EXHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352

1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
☐ a. contract ☐ a. bid/offer/application ☐ a. initial
☐ b. grant ☐ b. initial award ☐ b. material change
☐ c. cooperative agreement ☐ c. post-award
☐ d. loan For Material Change Only:
☐ e. loan guarantee year _____ quarter __________
☐ f. loan insurance date of last report _____________

4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:
☐ Prime ☐ Subawardee
Tier _________ , if known
Congressional District, if known Congressional District, if known

6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable __________________________

8. Federal Action Number, if known: 9. Award Amount, if known:

10. Name and Address of Lobby Entity 11. Individuals Performing Services (If individual, last name, first name, MI) (including address if different from No. 10) (last name, first name, MI)
(attach Continuation Sheet(s) if necessary)

12. Amount of Payment (check all that apply) 14. Type of Payment (check all that apply) $_______________ ☐ actual ☐ planned ☐a. retainer
☐b. one-time fee

13. Form of Payment (check all that apply): ☐c. commission ☐ a. cash ☐d. contingent fee
☐ b. in-kind; specify: nature _________________ ☐e. deferred Value _______________ ☐f. other, specify ___________________________

15. Brief Description of Services Performed or to be performed and Date(s) of Service, including officer(s), employee(s), or member(s) contacted, for Payment Indicated in Item 12:
(attach Continuation Sheet(s) if necessary)

16. Continuation Sheet(s) attached: ☐ Yes ☐No

17. Information requested through this form is authorized by Title 31 U.S.C.

Section 1352. This disclosure of lobbying reliance was placed by the tier above when his transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to Congress semiannually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

Signature:______________________________________________ Print Name: ____________________________________________ Title: __________________________________________________ Telephone No.:_________________________ Date:____________ Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL
Standard Form LLL Rev. 04-28-06
Distribution: Orig- Local Agency Project Files

INSTRUCTIONS FOR COMPLETING EXHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES

Page 425 of 494 ends
Page 47 of 51 ends

This disclosure form shall be completed by the reporting entity, whether subawardee or prime federal recipient at the initiation or receipt of covered federal action or a material change to previous filing pursuant to title 31 U.S.C. Section 1352. The filing of a form is required for such payment or agreement to make payment to lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress an officer or employee of Congress or an employee of a Member of Congress in connection with a covered federal action. Attach a continuation sheet for additional information if the space on the form is inadequate. Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.

1. Identify the type of covered federal action for which lobbying activity is or has been secured to influence, the outcome of a covered federal action.

2. Identify the status of the covered federal action.

3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last, previously submitted report by this reporting entity for this covered federal action.

4. Enter the full name, address, city, state, and zip code of the reporting entity. Include Congressional District if known.

Check the appropriate classification of the reporting entity that designates if it is or expects to be a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the first tier. Subawards include but are not limited to: subcontracts, subgrants, and contract awards under grants.

5. If the organization filing the report in Item 4 checks "Subawardee" then enter the full name, address, city, state, and zip code of the prime federal recipient. Include Congressional District, if known.

6. Enter the name of the federal agency making the award or loan commitment. Include at least one organization level below agency name, if known. For example, Department of Transportation, United States Coast Guard.

7. Enter the federal program name or description for the covered federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans and loan commitments.

8. Enter the most appropriate federal identifying number available for the federal action identification in item 1 (e.g., Request for Proposal (RFP) number, Invitation for Bid (IFB) number, grant announcement number, the contract grant. or loan award number, the application/proposal control number assigned by the federal agency). Include prefixes, e.g., "RFP-DE-90-001."

9. For a covered federal action where there has been an award or loan commitment by the Federal agency, enter the federal amount of the award/loan commitments for the prime entity identified in item 4 or 5.

10. Enter the full name, address, city, state, and zip code of the lobbying entity engaged by the reporting entity identified in Item 4 to influence the covered federal action.

11. Enter the full names of the individual(s) performing services and include full address if different from 10 (a). Enter Last Name, First Name and Middle Initial (Ml).

12. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (Item 4) to the lobbying entity (Item 10). Indicate whether the payment has been made (actual) or will be made (planned). Check all boxes that apply. If this is a material change report, enter the cumulative amount of payment made or planned to be made.

13. Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and value of the inkind payment.

14. Check all boxes that apply. If other, specify nature.

15. Provide a specific and detailed description of the services that the lobbyist has performed or will be expected to perform and the date(s) of any services rendered. Include all preparatory and related activity not just time spent in actual contact with federal officials. Identify the federal officer(s) or employee(s) contacted or the officer(s) employee(s) or Member(s) of Congress that were contacted.

16. Check whether or not a continuation sheet(s) is attached.

17. The certifying official shall sign and date the form, and print his/her name title and telephone number.

Public reporting burden for this collection of information is estimated to average 30-minutes per response, including time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503. SF-LLL-Instructions Rev. 06-04

Page 426 of 494 ends
Page 48 of 51 ends

EXHIBIT 10-U CONSULTANT IN MANAGEMENT SUPPORT ROLE

CONFLICT OF INTEREST AND CONFIDENTIALITY STATEMENT
RFP/RFQ PROCUREMENT NUMBERS (if applicable):

PROJECT NAME (and FPN, if applicable)1:

APPLICABILITY: To be filled out by local agency consultants in management support role. □ I am an employee of a consultant under contract to the local agency that is responsible for the procuring and administering of one or more consultant contracts containing either Federal or State funds.
□ I am in a management position with the local agency, my title is listed below and I have attached my duty statement and scope of work.
□ I hereby certify as follows:

1. I recuse myself from all potential conflicts of interest.

2. I will not directly or indirectly participate in, manage, or oversee any consultant selection procurement process in which the consulting firm of which I am employed is competing as a consultant or subconsultant.

3. I will not directly or indirectly influence any employee, staff member, or other individual participating in any consultant selection procurement process in which the consulting firm of which I am employed is as a consultant or subconsultant.

4. I will not directly or indirectly participate in, manage, or oversee any local agency contract that is with the consulting firm of which I am employed, regardless of whether the involvement of my employer in the contract is as a consultant or subconsultant. Among other things, this includes my not being involved in approving changes in the schedule, scope, deliverables or invoices.

5. I understand that if I am involved in any local agency contract that is with the consulting firm of which I am employed, in violation of 1. or 2. above, that local agency contract will no longer be eligible for Federal or State reimbursement because of my involvement. □ I certify that I have read and understand my responsibilities per 23 CFR 172.7(b)(5) □ I fully understand that it is unlawful for a person to utilize any organization name (i.e. local agency) or auxiliary organization information, which is not a matter of public record, for personal gain. 1 For on-call contracts or contracts for multiple projects, indicate accordingly.

Page 427 of 494 ends
Page 49 of 51 ends

□ I have read and fully understand all of the above.

Date: __________________ Signed:

Name:

Title:

Consultant Firm/Sole Proprietor:

REVIEWED BY PUBLIC WORKS DIRECTOR OR AUTHORIZED LOCAL AGENCY REPRESENTATIVE I have reviewed the foregoing “Conflict of Interest and Confidentiality Statement” and will ensure:
□ That the foregoing named local agency consultant who is under contract and in a management support role with our local agency, abides by the foregoing terms and conditions; □ That should the foregoing named local agency consultant, who is under contract and in a management support role with our local agency, violate any of the foregoing terms and conditions, the Caltrans DLAE will be notified and such violation will be considered a breach of ethics and could be a basis for ineligibility of State or Federal project funds. □ The procedures followed to procure and execute the contract, between the consulting firm and the local agency of which I am employed, comply with all federal and state requirements. Also this contract has a specific date from ________________ to ________________.

Date: __________________ Signed: ________________________________________ Name: ________________________________________
Title: _________________________________________
Department/Local Agency: _____________________________

Page 428 of 494 ends
Page 51 of 51 ends

SAMPLE AGREEMENT ACCEPTANCE

SAMPLE AGREEMENT ACCEPTANCE
I have received and reviewed the sample CONSULTANT’S
AGREEMENT including the INDEMNITY clause which was
included in the City’s RFQ/RFP. My signature above shall signify our firm’s acceptance of said contract if our firm is selected for awarding a contract for the project as described in said RFQ/RFP. This acceptance is made with the
understanding that the Compensation and Time for Completion clauses will be modified or created to contain the amounts and dates established for this contract.

BY: _____________________________
TITLE: ___________________________

Page 429 of 494 ends

ID Task
Mode
Task Name Duration Start Finish
0 MS Project Schedule 130 days Mon 6/17/24 Fri 12/13/24 1 Topographic Survey 38 days Mon 6/17/24 Wed 8/7/24
2 Survey field and Office 10 days Mon 6/17/24 Fri 6/28/24 3 Prepare topo 28 days Mon 7/1/24 Wed 8/7/24
4 Initial Project Research 30 days Mon 6/17/24 Fri 7/26/24 5 As-built/utility 5 days Mon 6/17/24 Fri 6/21/24
6 Geotechnical report 30 days Mon 6/17/24 Fri 7/26/24
7 Hydrology Review/study 30 days Mon 6/17/24 Fri 7/26/24 8 Plans/Specs (30%) 45 days Thu 8/8/24 Wed 10/9/24
9 Design 4 wks Thu 8/8/24 Wed 9/4/24
10 City Review 1 wk Thu 9/5/24 Wed 9/11/24
11 Initial CALTRANS Review 4 wks Thu 9/12/24 Wed 10/9/24 12 Plans/Specs (60%) 33 days Thu 9/12/24 Mon 10/28/24
13 Design 4 wks Thu 9/12/24 Wed 10/9/24
14 Construction Estimate 1 wk Thu 10/3/24 Wed 10/9/24
15 QC 3 days Thu 10/10/24 Mon 10/14/24
16 City Review 10 days Tue 10/15/24 Mon 10/28/24
17 Plans/Specs (90%) 22 days Tue 10/29/24 Wed 11/27/24
18 Design 2 wks Tue 10/29/24 Mon 11/11/24
19 Construction Estimate 1 wk Tue 11/5/24 Mon 11/11/24
20 Specifications 1 wk Tue 11/5/24 Mon 11/11/24
21 QC 2 days Tue 11/12/24 Wed 11/13/24
22 City Review 10 days Thu 11/14/24 Wed 11/27/24
23 Plans/Specs (Final) 12 days Thu 11/28/24 Fri 12/13/24 24 Final design preparation 2 wks Thu 11/28/24 Wed 12/11/24 25 Final Construction Estimate 1 wk Thu 12/5/24 Wed 12/11/24 26 Final Specifications 1 wk Thu 12/5/24 Wed 12/11/24
27 QC 2 days Thu 12/12/24 Fri 12/13/24
6/16 6/23 6/30 7/7 7/14 7/21 7/28 8/4 8/11 8/18 8/25 9/1 9/8 9/15 9/22 9/29 10/6 10/13 10/20 10/27 11/3 11/10 11/17 11/24 12/1 12/8 12/15 12/22 12/29 July August September October November December January Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress

Page 1 ends

Project: North Shafter Street Improvements - Objective 1 Date: June 17, 2024

Page 430 of 494 ends

ID Task
Mode
Task Name Duration Start Finish
0 MS Project Schedule Objective 2 200 days Mon 6/24/24 Fri 3/28/25 1 Task 1 Outreach 184 days Mon 6/24/24 Thu 3/6/25
2 Kick off Meeting 1 day Mon 6/24/24 Mon 6/24/24
3 Develop Outreach materials 28 days Tue 6/25/24 Thu 8/1/24 4 Deploy Public Survey 2 days Fri 8/2/24 Mon 8/5/24
5 Neighborhood Canvassing 45 days Fri 8/2/24 Thu 10/3/24 6 Initial Public Meeting 1 day Fri 10/4/24 Fri 10/4/24
7 Tabulate and map results 15 days Mon 10/7/24 Fri 10/25/24 8 Meet with City to discuss results 1 day Mon 10/28/24 Mon 10/28/24 9 Final Public Meeting 1 day Mon 3/3/25 Mon 3/3/25
10 Summarize results 2 days Tue 3/4/25 Wed 3/5/25
11 Meet with City to discuss results 1 day Thu 3/6/25 Thu 3/6/25 12 Task 2 Studies 71 days Mon 8/5/24 Mon 11/11/24
13 Drainage 60 days Mon 8/5/24 Fri 10/25/24
14 Topography 30 days Mon 8/5/24 Fri 9/13/24
15 Pedestrian 10 days Tue 10/29/24 Mon 11/11/24
16 Task 3 Preparation of Plan 140 days Mon 9/16/24 Fri 3/28/25 17 Concept Projects and Layouts 4 wks Mon 9/16/24 Fri 10/11/24 18 City Review 5 days Mon 10/14/24 Fri 10/18/24
19 Revision Concept 10 days Mon 10/21/24 Fri 11/1/24
20 Proposed Improvement Rankings
and cost estimates
1 wk Tue 10/29/24 Mon 11/4/24
21 City Review 4 wks Tue 11/5/24 Mon 12/2/24
22 Revision to projects, layouts, and
rankings
20 days Tue 12/3/24 Mon 12/30/24
23 Prepare and Submit Plan 20 days Tue 12/31/24 Mon 1/27/25 24 City Review 10 days Tue 1/28/25 Mon 2/10/25
25 Final revisions to plan and City
staff approval
15 days Fri 3/7/25 Thu 3/27/25
26 Presentation to City Council 1 day Fri 3/28/25 Fri 3/28/25 6/166/236/30 7/7 7/147/217/28 8/4 8/118/188/25 9/1 9/8 9/159/229/2910/610/1310/2010/2711/311/1011/1711/2412/112/812/1512/2212/291/5 1/121/191/26 2/2 2/9 2/162/23 3/2 3/9 3/163/233/30 4/6 4/134/204/27 5/4 5/115/185/25 6/1 6/8 6/156/226/29 7/6 July August September October November December January February March April May June July Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress

Page 1 ends

Project: North Shafter Street Improvements - Objective 2 Date: June 17, 2024

Page 431 of 494 ends

EDUCATION:

California Polytechnic State University, San Luis Obispo:

B.S., Civil and Environmental Engineering, 1992
California Polytechnic State University, San Luis Obispo:

M.S., Civil and Environmental Engineering, 1994
REGISTRATION:

Registered Civil Engineer, C057398 - California, September 1997 Registered Geotechnical Engineer, GE2644 – California, January 2004 PROFESSIONAL HISTORY:

Feb. 2022-Present
Soils Engineering, Inc., Bakersfield, CA
1994-2022
BSK Associates, Bakersfield, CA
PROFESSIONAL BACKGROUND:

Mr. Lau has more than 30 years of experience in geotechnical engineering, soils/earthwork observation and testing, and construction materials testing and inspection. His areas of expertise include investigations for foundations, seismic hazards, slope stability, liquefaction analyses, drainage studies, footing foundation designs, settlement evaluations, pavement designs, slab-on-grade design, drilled pier design and construction, pile driving design and construction, expansive soils, corrosive soils, excavation stability, shoring, compaction requirements and volumetric calculations.

His projects have included water and wastewater facilities, pipelines, canals, bridges, roadways and highways, schools, hospitals, parks, multi-story buildings, commercial office complexes, airports, energy sites, dams, retaining walls, manufacturing plants, and police/fire/prison sites. Mr. Lau has performed and managed geotechnical engineering and construction materials testing projects in Kern, Tulare, Kings and Fresno counties, and Owens Valley, Antelope Valley, and the Mojave Desert regions of California.

Recent projects on which Mr. Lau managed and supervised the materials testing and special inspections include:
7th Standard Road Improvement Client: County of Kern
Highway 204 and Chester Avenue Seismic Retrofit Client: Caltrans Warthan Creek Bridge Client: County of Kern
Pedestrian/Bike Path Client: City of Bakersfield
ON MAN LAU, P.E., G.E.

ENGINEERING MANAGER

Page 432 of 494 ends

7 | P a g e
City of Bakersfield 2020 & 2021 - Geotechnical & Materials Testing Services Contract Client: Public Works Department / City of Bakersfield
Contact: Roy Campos or Jeff Garnett (661) 326-3049
Term: Two (2) Year Contract (for the past 12 years)
Value: T&M Est. $ 786,225
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers Bolthouse Properties, LLC – Geotechnical, Materials Testing & Inspection Services Client: Bolthouse Properties, LLC
Contact: Kath MacNeill or Brad DeBranch (661) 323-4005
Term: Ongoing (Year to Years Services for over 15 years) Value: T&M Yearly Est. $200,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers Castle & Cooke – Geotechnical, Materials Testing & Inspection Services Client: Castle & Cooke
Contact: Ben Wageman (661) 664-6541
Term: Ongoing (Year to Year Services for over 20 years) Value: T&M Yearly Est. $200,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers Kern County Water Agency – Geotechnical, Materials Testing & Inspection Services Client: County of Kern
Contact: Martin Varga or Mike McGovern (661) 634-1484
Term: Ongoing (Year to Year Services for over 20 years) Value: T&M Yearly Est. $150,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers

COMPARABLE PAST PROJECTS

Page 433 of 494 ends

8 | P a g e
California Water Service Company – Geotechnical, Materials Testing & Inspection Services Client: California Water Service Company
Contact: Michael Serna (310) 247-1453, Jordan Dickson (661) 529-0548 Term: 1 Year Master Consulting Agreement (Year to Year Services for over 20 years) Value: T&M Yearly Est. $200,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers Southern California Gas Company - Materials Testing, Inspections & Surveying Contract Client: Southern California Gas Company
Contact: Nick Azizian (626) 731-0600
Term: 2 Year Master Consulting Agreement – 2014 to 2016, 2017 to 2019 Value: T&M Est. $ 200,000
Company Personnel: Field & Lab Testers, Surveying, Project Managers and Engineers Wonderful Companies - Geotechnical & Materials Testing & Inspection Services Client: Wonderful Companies
Contact: Ms. Tracy Burns-Lusich (661) 829-8115
Term: On Going (Year to Year Services – Services provided for over 20 years) Value: T&M Yearly Est. $200,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers Tejon Ranch Company - Geotechnical & Materials Testing & Inspection Services Client: Tejon Ranch Company
Contact: Joe Rentfro (661) 858-2161
Term: Ongoing (Year to Year Services – Services provided for over 20 years) Value: T&M Yearly Est. $ 100,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers

COMPARABLE PAST PROJECTS

Page 434 of 494 ends

7 | P a g e
City of Bakersfield 2020 & 2021 - Geotechnical & Materials Testing Services Contract Client: Public Works Department / City of Bakersfield
Contact: Roy Campos or Jeff Garnett (661) 326-3049
Term: Two (2) Year Contract (for the past 12 years)
Value: T&M Est. $ 786,225
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers Bolthouse Properties, LLC – Geotechnical, Materials Testing & Inspection Services Client: Bolthouse Properties, LLC
Contact: Kath MacNeill or Brad DeBranch (661) 323-4005
Term: Ongoing (Year to Years Services for over 15 years) Value: T&M Yearly Est. $200,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers Castle & Cooke – Geotechnical, Materials Testing & Inspection Services Client: Castle & Cooke
Contact: Ben Wageman (661) 664-6541
Term: Ongoing (Year to Year Services for over 20 years) Value: T&M Yearly Est. $200,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers Kern County Water Agency – Geotechnical, Materials Testing & Inspection Services Client: County of Kern
Contact: Martin Varga or Mike McGovern (661) 634-1484
Term: Ongoing (Year to Year Services for over 20 years) Value: T&M Yearly Est. $150,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers

COMPARABLE PAST PROJECTS

Page 435 of 494 ends

8 | P a g e
California Water Service Company – Geotechnical, Materials Testing & Inspection Services Client: California Water Service Company
Contact: Michael Serna (310) 247-1453, Jordan Dickson (661) 529-0548 Term: 1 Year Master Consulting Agreement (Year to Year Services for over 20 years) Value: T&M Yearly Est. $200,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers Southern California Gas Company - Materials Testing, Inspections & Surveying Contract Client: Southern California Gas Company
Contact: Nick Azizian (626) 731-0600
Term: 2 Year Master Consulting Agreement – 2014 to 2016, 2017 to 2019 Value: T&M Est. $ 200,000
Company Personnel: Field & Lab Testers, Surveying, Project Managers and Engineers Wonderful Companies - Geotechnical & Materials Testing & Inspection Services Client: Wonderful Companies
Contact: Ms. Tracy Burns-Lusich (661) 829-8115
Term: On Going (Year to Year Services – Services provided for over 20 years) Value: T&M Yearly Est. $200,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers Tejon Ranch Company - Geotechnical & Materials Testing & Inspection Services Client: Tejon Ranch Company
Contact: Joe Rentfro (661) 858-2161
Term: Ongoing (Year to Year Services – Services provided for over 20 years) Value: T&M Yearly Est. $ 100,000
Company Personnel: Field & Laboratory Testers, Project Managers and Engineers

COMPARABLE PAST PROJECTS

Page 436 of 494 ends

4400 YEAGER WAY
BAKERSFIELD, CA 93313
OFFICE: (661) 831-5100
FAX: (661) 831-2111
[email protected]
WWW.SOILSENGINEERING.COM
Soils Engineering, Inc. (SEI) has almost 60 years of experience in providing geotechnical and geological engineering, environmental assessments, and testing and surveying services to private, government and industrial clients throughout California. Our firm has proudly serviced Kern County, Tulare County, Ventura County, Monterey County, San Joaquin County and San Luis Obispo County. We hope you will consider us during the bidding process to provide engineering services on your current or future projects.

Below are some of the key commitments our company makes to each of our clients in order to fulfill project needs:
• Continuity: Our firm can perform Geotechnical Investigations, Geological Hazards Reports, Surveying, and Phase 1 Environmental Assessments at the initiation of the project; we can then perform the materials testing program during the construction phase of project development. It is in the best interest of our clients to use our firm to perform engineering services throughout the entire lifecycle of the project from design through construction in order to effectively minimize risk and maintain continuity. • Highest standard of technical expertise: Our company is staffed with geotechnical and civil engineers, a certified engineering geologist, a chief surveyor, a field supervisor, a laboratory manager, and engineering technicians with extensive experience in laboratory and field testing. We have built a team that is responsive and informed in order to provide the support our clients need. • Efficiency and cost awareness: Our sixty years of experience has enabled us to work efficiently when dealing with projects for schools, energy and power, water, transportation, power plants, and commercial and residential developments. We pledge through our business practice to problem solve in a timely manner. Our past and current clients are our best advertisement. • In-house production: From drilling and laboratory testing to issuing engineering reports, we provide services for each step of a project. We operate our own drill rig that is dispatched on a daily basis out of our Bakersfield office. We perform all laboratory testing (soils, concrete, steel, asphalt, and masonry) in our laboratory located on Yeager Way in Bakersfield. This gives us a distinct advantage because we are able to react quickly to the needs of our clients and to deliver on time to meet their requirements.

Above all else, Soils Engineering, Inc. is a client-focused firm. We put forth every effort to ensure the standards our clients have come to expect from our many years of service is upheld through all of the projects in which we assist.

On the following pages can be found a list of the services we provide.

Page 437 of 494 ends

4400 YEAGER WAY
BAKERSFIELD, CA 93313
OFFICE: (661) 831-5100
FAX: (661) 831-2111
[email protected]
WWW.SOILSENGINEERING.COM
Geotechnical Services
● Geotechnical (Soils) Investigations
● Sewage Feasibility Studies
● Pavement Design
● Slope Stability Analysis
● Settlement Analysis
● Liquefaction Potential Studies
● Sump Drainage Studies
Geological Services
● Geologic Hazard Studies
● Fault Investigations
● Geophysical Investigations
● Seismic Evaluations
● Landslide Investigations
● Pipeline Risk Evaluations
● Hydrological Studies
● Ground Penetrating Radar (GPR)
Materials Testing Services (All tests are performed in-house) ● Soils Field & Laboratory Testing
● Concrete Sampling & Testing
● Concrete Mix Design
● Post-Tension Inspection
● Masonry Inspection & Qualifications Tests
● Asphalt QA/QC Field & Laboratory Testing
● Asphalt Mix Design
● Structural Steel & Reinforcing Steel (Installation & Material Qualification) ● High Strength Bolting (Installation & Material Qualification) ● Welding Shop & Field Inspection

Page 438 of 494 ends

4400 YEAGER WAY
BAKERSFIELD, CA 93313
OFFICE: (661) 831-5100
FAX: (661) 831-2111
[email protected]
WWW.SOILSENGINEERING.COM
Environmental Services
Phase 1 Environmental Site Assessments, 3Phase II Environmental Site Assessments & Preliminary Environmental Assessments (PEAs):
● Soil Sampling
● Water Sampling
● Chemical Analysis of Samples
● Soil Vapor Sampling and Analysis
● Asbestos and Lead-Based Paint Sampling and Analysis
● Monitoring Well Installations and Sampling (Quarterly, etc.) ● Waste Depth Assessments and Cap Assessments at Landfills Contaminant Risk and Hazard Assessments, Spill Prevention Control & Countermeasure Plans (SPCC), Storm Water Pollution Prevention Plans (SWPPP) and SWPPP Inspections, and Remedial Activities:
● Preparation of Reports and Work Plans (RAW) and Reports ● Soil Removal and Disposal (hazardous and non-hazardous) ● Groundwater Treatment
● Soil Vapor Extraction, Design, Installation and Operation ● Vapor Intrusion Mitigation
● Bioventing and Bioremediation
● Air Sparging
● Other Remedial Activities
Drilling Services
● Geotechnical & Environmental Borings for Sample Collection ● Installation of Monitoring Wells
● Installation of Vapor Extraction Wells
● Abandonment of Monitoring Wells and Water Wells
● Installation of Inclinometer Wells

Page 439 of 494 ends

Date: 06/21/2024 Project No: 240450
Project Name: City of Shafter North Shafter Street Improvements 253.9 230.81 218.47 200 195 170 155 155 135 187.54 159.49 161.17 121.18 12 Item
Chief Engineer - S. LuxSenior Engineer - S. RadsickSenior Engineer - J. KaltenbergEngineer IIIProject Manager IIDesigner IIICAD Technician IIIProject CoordinatorProject TechnicianSenior Land SurveyorChainman/RodmanInstrument ManSurvey Tech VSub-Consultant Truck Total
HRS HRS HRS HRS HRS HRS HRS HRS HRS HRS HRS HRS HRS $ $ $ OBJECTIVE 1 $209,991
PROJECT KICKOFF MEETING CITY 2 2 2 2 $1,303
TOPOGRAPHIC SURVEY $42,421
Field Survey 80 80 80 $26,613
Office Survey 24 $4,501
Processing Topographic survey 80 $9,694
Project Management 5 5 $1,613
INITIAL PROJECT RESEARCH $23,658
As-Built/Utility 2 4 10 $2,812
Geotechnical Report 1 10800 $11,000
Hydrology Review/Study 8 40 $9,846
INITIAL DESIGN 30 PERCENT $36,433
Initial Design 30 40 80 $28,524
Cost Estimate (rough for discussion only) 4 24 $4,880
30% Design Meeting with City 2 2 2 $886
Project Management 6 4 $2,143
PS&E (60%) $42,610
60 Percent Plan Set 30 10 80 40 $28,724
Cost Estimate 2 8 16 $4,782
60% Specifications 16 8 $5,293
Quality Control 6 $1,523
Design Meeting with City 1 1 2 $455
Project Management 6 2 $1,833
PS&E (90%) $36,063
90 Percent Plan Set 20 20 80 20 $25,316
Cost Estimate 2 8 16 $4,782
90% Specifications 4 4 $1,723
Quality Control 6 $1,523
Design Meeting with City 2 2 2 $886
Project Management 6 2 $1,833
PS&E (Final) $18,455
Final Percent Plan Set 8 10 16 8 $7,806
Cost Estimate 4 12 8 $4,683
Final Specifications 4 4 $1,723
Quality Control 6 $1,523
Design Handoff Meeting with City 2 2 2 $886
Project Management 6 2 $1,833
Permitting and Construction Support $9,046
Caltrans Permitting 4 16 $4,123
Bid Support 2 4 $1,262
Construction Support 2 16 $3,662
$0
Objective II $164,804
PROJECT KICKOFF MEETING CITY AND MONTHLY MEETINGS 2 8 8 8 $3,404 MATERIAL DEVELOPMENT $4,554
Charrette Materials 2 $310
Interactive online GIS map dashboard 5 $775
Online Survey Form 4 $620
Project Management 10 2 $2,849
COMMUNITY OUTREACH $10,079
Survey deployment (online result review and tabulation) 4 $620 Neighborhood Canvasing (assuming survey review only) 6 $930 Public Meeting (initial) and tabulation of the results 4 10 4 $2,398 Meeting with City to discuss results of the outreach 2 2 2 2 $1,242 Public Meeting (final meeting to discuss results with community) 4 8 $2,040 Project Management 10 2 $2,849
Studies $60,159
Drainage Study 4 40 60 $21,754
Topography Study 2 40 $7,237
Pedestrian & Bike (Peak Hour AM&PM for 7 Days @ 4 Locations) 4 2 8 168 168 $27,389 Project Management 10 8 $3,779
Plan Preparation $86,608
Concept Projects and Layout 4 60 10 120 16 $39,004
Concept Revisions 20 40 20 $13,900
Proposed Improvement Rankings and Cost Estimates 2 28 20 $9,725 2nd Revisions to projects, layouts, and rankings 2 6 5 40 10 $11,169 Final Revisions to plan 2 5 5 16 10 $6,870
City Council Presentation 4 4 4 $1,542
Project Management 10 12 $4,399
$0
Total 106 147 147 326 8 576 68 183 173 29 80 80 80 10800 276 $374,795

Page 440 of 494 ends
Page 441 of 494 ends

City of Shafter
Statement of Qualifications
North Shafter Street Improvements Engineering Services
May 10, 2024
1800 30th Street, Suite 260
Bakersfield, California 93301
(661) 327-1969

Page 442 of 494 ends

Table of Contents
Executive Summary 1
Scope of Work & Associated Work Plan 3
Project Team 9
Firm Organizational Chart 10
Resumes and Qualifications 13
Relevant Experience 22
Financial Management & Accounting 29
Required Forms 30

Page 443 of 494 ends

City of Shafter SOQ Page 1
Executive Summary
The City of Shafter desires to engage a professional consultant to provide engineering services for the following:
• Construction plans for sidewalk and bicycle lane improvements on Highway 43 • North Shafter Transportation Improvements and Sustainability Plan For these services Ruettgers & Schuler Civil Engineers (R&S CE) has assembled a team to provide the City of Shafter with the resources for the successful accomplishment of the two projects.

R&S CE was established in 1980 in Bakersfield California as a consulting civil engineering firm specializing in transportation and public works facilities design and construction, right-of-way engineering, acquisition and relocation, traffic impact and transportation studies, and railroad grade separation projects. The majority of projects undertaken by our firm involve working directly with public agencies including special districts, cities, counties and the State of California, through their public works or transportation offices.

As part of this SOQ, R&S CE proposes to team with the firm of Dewalt Corporation for survey services. Dewalt completed surveys and a Record of Survey for the North Park and North Shafter areas and along SR 43. The DeWalt Corporation Land Surveying Department supports public agencies, large utilities, and private companies by providing Professional Land Surveying services and solutions; Topographic and/or aerial surveying to support engineering of new construction; Construction staking of engineered improvements or facilitiess As-built documentation of site work, pipelines and facilities. Legal descriptions and exhibits for properties, licenses and easements. Interpretation and implementation of the California Subdivision Map Act.

As evidenced by project experience and quality of individuals, R&S CE has significant public works experience.

We have a blend of engineers and professionals who have worked in the private and public sector and therefore have an understanding of the needs of public agencies, and how to deliver successful projects.

The Principal Engineer for R&S CE will be Ian J. Parks, P.E., who will act as the authorized individual to negotiate and sign contracts. Kevin Harmon, PE, will act as Project Manager for both projects. Kevin has a long history working in Shafter, including working on the installation of sewer within the North Park and North Shafter areas, and is familiar with SR 43 and the improvements that are being considered.

R&S CE has a long history of accomplishing a broad spectrum of projects involving State and Federal procedures.

We have prepared plans and various project documents for both public agencies and private entities for

Page 444 of 494 ends

City of Shafter SOQ Page 2
improvements on State highways and for projects using State and Federal funding. R&S CE and Subconsultant are familiar with federal accounting requirements for these projects, and have broad experience with the forms contained in the Local Assistance Procedures Manual.

R&S CE along with the sub-consultant team has a diverse range of services which include the following areas:
• Preparation of engineering reports (Including Caltrans PSR & PR) • Preliminary design and cost studies
• Preparation of plans, specifications and cost estimates, including contract documents • Field surveying and topographic mapping for project control and design • Utility investigations/design and relocation coordination • Roadway and drainage system design, including flexible/rigid pavement design • Traffic signal and lighting systems design
• Traffic analysis and planning studies (development impacts, design requirements) • Traffic management plans (Construction, special events) • Storm drain, sewer, and water system design
• Right of way investigation and mapping, including preparation of plats and legal descriptions • Right of way acquisition and relocation
• Construction bid and award assistance
• Project management/time scheduling
• Construction management
• Government agency coordination
• Grant and funding applications
• Railroad coordination
• Stormwater Pollution Prevention Plans (SWPPP)

Page 445 of 494 ends

City of Shafter SOQ Page 3
Scope of Work & Associated Work Plan
Following is R&S CE’s understanding of each project and associated work items, including a detailed schedule.

Construction plans for sidewalk, curb & gutter and bicycle lane improvements on Highway 43 The project will include the preparation of plans, specifications and estimate (PS&E) for the construction of a bike lane, curb & gutter and sidewalk along SR 43. The limits of the project are between Mayer Lane and Tulare Avenue. Following are items which will need to be evaluated and designed in order to deliver a successful project:
• An evaluation of the grant and funding will be made in order to confirm work items and deliverables in order to meet all goals of the grant
• Initial layout and design to determine the geometrics necessary to accommodate the bike lane, sidewalk and future landscaping improvements
• The project is within Caltrans right-of-way. In consultation with the City, an initial meeting/submittal should be considered at the 30% design stage in order to confirm the proposed geometrics for the project and preliminary striping concept
• Determine drainage patterns and evaluate location of terminus of runoff • Existing drainage inlets will need to be evaluated to determine if they can be utilized in the project and if they will meet ADA standards
• Existing driveways along SR 43 will need to be defined and designed to work with existing infrastructure
• Investigate existing utilities along SR 43 and propose solutions for the interfering utilities (if any) • The mailboxes along SR 43 will need to be evaluated as to where they will be placed and confirm that ADA access and standards are met
• Striping for the bike lane will need to be evaluated through the intersections to the west • The intersection of SR 43 and Tulare will need to be evaluated as to the terminus of the curb & gutter around the return and property access for the residence at the corner • ADA standards adhered to along the pedestrian corridor North Shafter Transportation Improvements and Sustainability Plan The project will include the development of a master plan for the North Shafter area. The limits of the project are outlined in the RFP and generally include the areas as shown in the study provided by the City as an addendum to the RFP. The goals of the project are to prepare a general plan that will identify road improvement projects to address the needs of the residents. An important part of the process will be neighborhood input and being responsive to the needs of the residents. The goal is for the City Council to adopt the plan to implement improvements within the North Shafter area. Following are items which will need to be evaluated and designed in order to deliver a successful project:
• An evaluation of the grant and funding will be made in order to confirm work items and deliverables in order to meet all goals of the grant

Page 446 of 494 ends

City of Shafter SOQ Page 4
• A detailed work plan will be prepared for review and comment by the City in order to confirm that all items are being covered by the work plan
• It is understood that the City will provide topographic survey information within the project limits
• It is anticipated that a detailed site visit(s) will be necessary to confirm existing conditions and to make notes and detailed evaluation of the project limits • Initially our office would prepare the technical studies, alongside investigating potential layouts and options for roadway configuration
o These layouts and options would be prepared for use in public outreach • We would submit the studies and layouts/options to the City for review and approval • We would then prepare final documents to be presented at the public meeting for input from the residences. In addition to the layouts, surveys would be prepared for residences to fill out • Taking into account information from the public meeting, and in discussions with the City, we would begin work on the draft plan for the community
• Once the draft plan is complete and conceptually approved by the City, it is anticipated that a presentation to the City Council, summarizing the investigation and proposed plan would be made
• Upon any comments from council, and final review and comment by the City on the draft plan, we would create the final plan for adoption by the City Council

Page 447 of 494 ends

City of Shafter SOQ Page
5 0 Intersection Improvement Schedule 6/18/241 Project Startup 6/18/242 Review Documents & Prepare Plan of Action
6/18/24 4 days
3 Attend kickoff Meeting 6/24/24 1 day 24 Site Investigation, Data Collection, Record Research
6/25/24
5 Gather project data, ROW, control,
GIS & mapping
6/25/24 10 days 3
6 Utility Investigation 6/25/24 20 days 37 Field Investigation/Define Survey Limits
6/25/24 5 days 3
8 Survey/Basemap 7/2/249 Topo survey/Set control 7/2/24 10 days 7 10 Prepare basemap 7/16/24 5 days 911 Preliminary Design (30%) 7/23/2412 Layout Curb & Gutter, Sidewalk and Bike Lane Limits
7/23/24 20 days 10
13 Submit to City 8/20/24 1 day 1214 City review/comment 8/21/24 10 days 1315 Caltrans Coordination (Prelim) 9/4/2416 Coordinate with Caltrans/City to obtain geometric approval of layouts
9/4/24 20 days 14
17 Preliminary Design (60%) 10/2/2418 Design to 60% Design level 10/2/2419 Street improvement design including drainage
10/2/24 10 days 16
20 Traffic design (Striping, Signs) 10/2/24 10 days 1621 Prepare prelim special provision for bid items
10/16/24 1 day 19
22 Prepare preliminary cost
estimate (20% Cont.)
10/16/24 10 days 19
23 Identify utility conflicts 10/16/24 5 days 1924 Submit to City for review/ comment
10/30/24 1 day 22
25 City review/comment 10/31/24 10 days 24
# Traits Title Expected Start Given
Work
Predec
essors
Intersection Improvement Schedule
Project Startup
Review Documents & Prepare Plan of Action 6/21/24
Attend kickoff Meeting 6/24/24
Site Investigation, Data Collection, Record Research
Gather project data, ROW, control, GIS & mapping 7/8/24 Utility Investigation 7/22/24
Field Investigation/Define Survey Limits 7/1/24
Survey/Basemap
Topo survey/Set control 7/15/24
Prepare basemap 7/22/24
Preliminary Design (30%)
Layout Curb & Gutter, Sidewalk and Bike Lane Limits 8/19/24 Submit to City 8/20/24
City review/comment 9/3/24
Caltrans Coordination (Prelim)
Coordinate with Caltrans/City to obtain geometric ap… 10/1/24 Preliminary Design (60%)
Design to 60% Design level
Street improvement design including drainage 10/15/24
Traffic design (Striping, Signs) 10/15/24
Prepare prelim special provision for bid items 10/16/24 Prepare preliminary cost estimate (20% Cont.) 10/29/24
Identify utility conflicts 10/22/24
Submit to City for review/comment 10/30/24
City review/comment 11/13/24
Q1 / 2024 Q2 / 2024 Q3 / 2024 Q4 / 2024 Q1 / 20253 4 5 6 7 8 9 10 11 12 1 State Route 43 Sidewalk & Bike Path Schedule
Ruettgers & Schuler Civil Engineers

Page 448 of 494 ends

City of Shafter SOQ Page
6 26 Final Design (90%) 11/14/2427 Prepare 90% Plan Set 11/14/2428 Detailed plan set preparation 11/14/24 10 days 2529 Prepare special provisions and standard City contract documents
11/14/24 10 days 25
30 Submit to City for review/
comment
11/28/24 1 day 28
31 City review/comment 11/29/24 10 days 3032 Final Design - Bid Documents (100%)
12/13/24
33 Prepare 100% Plan Set 12/13/2434 Revise plans per comments/ Finalize
12/13/24 5 days 31
35 Prepare Final Engineer's
Estimate
12/13/24 5 days 31
36 Prepare special provisions and
standard City contract documents
12/13/24 5 days 31
37 Submit all required Documents
to City
12/20/24 1 day 36
# Traits Title Expected Start Given
Work
Predec
essors
Final Design (90%)
Prepare 90% Plan Set
Detailed plan set preparation 11/27/24
Prepare special provisions and standard City contract… 11/27/24 Submit to City for review/comment 11/28/24
City review/comment 12/12/24
Final Design - Bid Documents (100%)
Prepare 100% Plan Set
Revise plans per comments/Finalize 12/19/24
Prepare Final Engineer's Estimate 12/19/24
Prepare special provisions and standard City contract… 12/19/24 Submit all required Documents to City 12/20/24
Q1 / 2024 Q2 / 2024 Q3 / 2024 Q4 / 2024 Q1 / 20253 4 5 6 7 8 9 10 11 12 1 State Route 43 Sidewalk & Bike Path Schedule
Ruettgers & Schuler Civil Engineers

Page 449 of 494 ends

City of Shafter SOQ Page
7 0 North Shafter Transportation
Improvements Plan
6/17/24
1 Notice to Proceed for generation
of Schedule & Cost
6/17/24
2 Prepare cost and schedule 6/17/24 3 days3 Coordinate with the City regarding schedule and cost
6/20/24 10 days 2
4 Review by IOAI 7/4/24 45 days 35 Notice to Proceed 9/5/24 1 day 46 Project Startup 9/6/247 Review Grant, ROS & Topo and scope of work
9/6/24 10 days 5
8 Prepare detailed scope of work
and action plan to meet Grant and City objectives
9/20/24 10 days 7
9 Attend kickoff Meeting With City 10/4/24 1 day 8
10 Site Investigation, Data Collection,
Record Research
10/7/24
11 Gather project data, ROW, control,
GIS & mapping
10/7/24 10 days 9
12 Utility Investigation 10/7/24 10 days 913 Field Investigation to confirm topo and note any changes
10/21/24 5 days 11
14 Basemap 10/28/2415 Prepare basemap, including all
constraints
10/28/24 10 days 13
16 Technical Studies 11/11/2417 Drainage Study 11/11/24 20 days 1518 Topographic Study 11/11/24 20 days 1519 Pedestrian and Bike Study 11/11/24 20 days 1520 Other studies as necessary 11/11/24 20 days 1521 Prepare Improvement Alternatives Study
12/9/24
22 Layout drainage options based on
study
12/9/24 20 days 16
23 Identify roadway width &
configuration options
12/9/24 30 days 16
# Title Expected
Start
Given Work
Pred
eces
sors
North Shafter Transportation Improvements Plan 12/23/25 Notice to Proceed for generation of Schedule & Cost 9/5/24 Prepare cost and schedule 6/19/24
Coordinate with the City regarding schedule and cost 7/3/24 Review by IOAI 9/4/24
Notice to Proceed 9/5/24
Project Startup 10/4/24
Review Grant, ROS & Topo and scope of work 9/19/24
Prepare detailed scope of work and action plan to me… 10/3/24 Attend kickoff Meeting With City 10/4/24
Site Investigation, Data Collection, Record Research 10/25/24 Gather project data, ROW, control, GIS & mapping 10/18/24 Utility Investigation 10/18/24
Field Investigation to confirm topo and note any chan… 10/25/24 Basemap 11/8/24
Prepare basemap, including all constraints 11/8/24
Technical Studies 12/6/24
Drainage Study 12/6/24
Topographic Study 12/6/24
Pedestrian and Bike Study 12/6/24
Other studies as necessary R&S
Prepare Improvement Alternatives Study 2/14/25
Layout drainage options based on study 1/3/25
Identify roadway width & configuration options 1/17/25
2023 2024 2025 2026
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
North Shafter Transportation Improvements and Sustainability Plan Ruettgers & Schuler Civil Engineers

Page 450 of 494 ends

City of Shafter SOQ Page
8 24 Prepare cost estimate for
alternatives
1/20/25 10 days 23
25 Coordinate with the City to
determine preferred options
2/3/25 10 days 24
26 Community Outreach 2/17/2527 Prepare exhibits 2/17/2528 Prepare exhibits for public meeting to show alternatives
2/17/25 30 days 25
29 Prepare survey for residents to
respond to
2/17/25 30 days 25
30 Submit to City for review/
comment
3/31/25 30 days 28
31 Prepare final exhbits and survey 5/12/25 20 days 3032 Public Meeting 6/9/25 3033 Coordinate public meeting and survey with the City
6/9/25 20 days 31
34 Attend meeting 7/7/25 1 day 3335 Compile Input and Survey results
7/8/25 10 days 34
36 Prepare Draft Transportation and
Sustainability Plan
7/22/25
37 Prepare cross sections/limits 7/22/25 20 days 3238 Prepare layout for areas/limits of defined improvements
7/22/25 20 days 32
39 Prepare draft cost estimate 8/19/25 10 days 3840 Prepare document summarizing the plan
9/2/25 20 days 39
41 City review/comment 9/30/25 20 days 4042 Final Transportation and Sustainability Plan
10/28/25
43 Revise sections per comments 10/28/25 20 days 4144 Revise layout for areas/limits of defined improvements per commetns
10/28/25 20 days 41
45 Prepare Final Engineer's Estimate 11/25/25 10 days 4446 Prepare final document based on comments
11/25/25 20 days 44
47 Submit all required Documents to
City
12/23/25 1 day 46
# Title Expected
Start
Given Work
Pred
eces
sors
Prepare cost estimate for alternatives 1/31/25
Coordinate with the City to determine preferred options 2/14/25 Community Outreach 7/21/25
Prepare exhibits 6/6/25
Prepare exhibits for public meeting to show alternatives 3/28/25 Prepare survey for residents to respond to 3/28/25
Submit to City for review/comment 5/9/25
Prepare final exhbits and survey 6/6/25
Public Meeting 7/21/25
Coordinate public meeting and survey with the City 7/4/25 Attend meeting 7/7/25
Compile Input and Survey results 7/21/25
Prepare Draft Transportation and Sustainability Plan 10/27/25 Prepare cross sections/limits 8/18/25
Prepare layout for areas/limits of defined improvements 8/18/25 Prepare draft cost estimate 9/1/25
Prepare document summarizing the plan 9/29/25
City review/comment 10/27/25
Final Transportation and Sustainability Plan 12/23/25
Revise sections per comments 11/24/25
Revise layout for areas/limits of defined improvement… 11/24/25 Prepare Final Engineer's Estimate 12/8/25
Prepare final document based on comments 12/22/25
Submit all required Documents to City 12/23/25
2023 2024 2025 2026
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
North Shafter Transportation Improvements and Sustainability Plan Ruettgers & Schuler Civil Engineers

Page 451 of 494 ends

City of Shafter SOQ Page 9
Project Team
Prime Consultant
Ruettgers & Schuler Civil Engineers
Partnership
1800 30th Street, Suite 260
Bakersfield, CA 93301
Ian J. Parks, P.E.
661.327.1969 Ext. 204
[email protected]
Sub-consultants
DeWalt Corporation
1930 22nd Street
Bakersfield, CA 93301
Adam Stubbs LSIT
(661) 323.4600
[email protected]

Page 452 of 494 ends

City of Shafter SOQ Page 10
Firm Organizational Chart
Organizational charts are shown for the two projects. Following is a summary of staff and roles as they relate to the two projects:
• Construction plans for constructing sidewalk and bicycle lane improvement at Highway 43 o Ian Parks will be the Principal Engineer on the project and is the individual able to negotiate the agreement.
o Kevin Harmon will be lead Project Manager and Design Engineer o Linda Hakimi will be the lead for preparation of special provisions o Warren Maxwell will be lead QA/QC on the project
o Other staff will supplement the design, drafting, estimate preparation and detailing of the plans • North Shafter Transportation Improvements and Sustainability Plan o Ian Parks will be the Principal Engineer on the project and is the individual able to negotiate the agreement.
o Kevin Harmon will be lead Project Manager and Design Engineer o Linda Hakimi will be the lead for preparation of required studies and assist in the work plan for the project
o Warren Maxwell will be lead QA/QC on the project and will lend input on design standards and layouts of exhibits
o Other staff will supplement the design, drafting and detailing of the plan and exhibits

Page 453 of 494 ends

City of Shafter SOQ Page 11 Ian Parks Principal Engineer Kevin Harmon, PE Project Manager, Designer Linda Hakimi, PE Specifications Shalisha Hodson Staff Traffic Tech Warren Maxwell, PE QA/QC Alex Leano, EIT Staff Engineer Dewalt Corporation Survey Mike Serapiglia Designer Dancie Grumbles Engineering Tech John Schuler Managing Principal OrganizationalChart Construction plans for constructing sidewalk and bicycle lane

Page 454 of 494 ends

City of Shafter SOQ Page 12 Ian Parks Principal Engineer Kevin Harmon, PE Project Manager, Designer Linda Hakimi, PE Lead Traffic Shalisha Hodson Staff Traffic Tech Warren Maxwell, PE QA/QCAlex Leano, EIT Staff Engineer Mike Serapiglia Designer Dancie Grumbles Engineering Tech John Schuler Managing Principal OrganizationalChart North Shafter Transportation Improvements and Sustainability Plan

Page 455 of 494 ends

City of Shafter SOQ Page 13
Resumes and Qualifications
The individuals that comprise the team of Ruettgers & Schuler Civil Engineers and sub-consultant on the team have a broad spectrum of past experience involving both public and private infrastructure projects. Following are staff resumes which show their qualifications and experience.

Page 456 of 494 ends

City of Shafter SOQ Page 14
Ian J. Parks, P.E.

Principal/Project Manager
Education: California Polytechnic State University, San Luis Obispo, BSCE, 1994 Professional Registration: Professional Registered Civil Engineer, California, C58155 Professional Affiliation: Past President, APWA Kern Branch Past President, ASCE, Los Angeles Section, Southern San Joaquin Branch
Responsibilities/Experience:

As Project Manager/Senior Engineer, Mr. Parks is responsible for overseeing the preparation of transportation, traffic impact and traffic signal corridor studies, and design oversight for a variety of roadway improvement projects, traffic signal systems, site and drainage improvements. He is also responsible for oversight on utility investigations and relocation efforts, preparation of right-of-way mapping, construction inspection on road improvements. He has been with Ruettgers & Schuler Civil Engineers since 1994, becoming a partner in 2004.

Project Experience:

On Call Engineering Services, City of Bakersfield – Project Manager/Design Engineer for design of a variety of capital improvement projects including Stine Road widening, sewer replacement on Planz Road. Traffic Signal & Lighting at Panama Lane and Mountain Ridge Drive. Truxtun Avenue and Commercial Way Street Improvements.

Traffic Engineering Services, City of Delano - Project Manager for the preparation of stop control and signal warrants for several intersections, signal plans, striping plans for new bike lanes and intersection reconfiguration in the City of Delano.

Traffic Signal Design - Project manager for more than 50 Traffic Signal PS&E for new and modified traffic signal and lighting systems.

Transportation Facilities Studies – Design Engineer/Project Manager for various evaluation studies for proposed transportation facilities, including alignment, feasibility, traffic analysis and estimates.

Most studies were for public agencies or private firms teaming with public agencies.

Stallion Springs CSD Road Repair – Project Manage/Design Engineer for several biennial road maintenance projects involving roadway reconstruction, drainage improvements, parking lot design and reconstruction and overlays. Work included preparation of complete contract documents, bidding, awarding contract and construction management

Page 457 of 494 ends

City of Shafter SOQ Page 15
John D. Schuler, P.E.

Managing Principal/Project Manager
Education: California Polytechnic State University, San Luis Obispo, BSAgE, 1983 Professional Registration: Professional Civil Engineer, California, C51825 Responsibilities/Experience:

As Managing Principal/Project Engineer, Mr. Schuler is responsible for establishing and directing project tasks, creating cost estimates and schedules, and overall management. He is the principal point of contact and coordination with clients and governmental agencies. He has over thirty years’ experience in managing a variety of mechanical, software and civil engineering projects. Since joining the firm of Ruettgers & Schuler Civil Engineers (formerly Ronald F. Ruettgers Civil Engineer) in 1991, he has garnered extensive experience in traffic analysis, design and project management of highway transportation and public works projects in Kern County. Project types include: transportation studies, grade separations, highways, interchanges, bridges, road widening, site design, and right-of-way engineering.

Project Experience:

Railroad Grade Separations, Greater Bakersfield Separation of Grade District – Project Manager for preliminary design and funding studies for grade separations at multiple at-grade railroad crossings in metro Bakersfield for submittal to the Public Utilities Commission and State grade separation program.

Traffic Impact Studies - Principal/Project Manager – Prepared or oversaw the preparation of more than 600 traffic studies within Kern County for schools, residential, commercial, alternative energy, industrial development, as well as public agency projects.

On-call Engineering Services for the City of Bakersfield 1998-2006, 2010-2021 – Principal/Project Manager for design of Rosedale Highway (S.R. 58) conceptual study and roadway widening, Friant-Kern Canal relocation at Calloway Drive, Brimhall Road widening, Ming Avenue widening, and various projects.

Renfro Road Specific Plan at BNSF Railway, Grade Separation District – Principal Engineer for the preparation of conceptual designs and ultimate right of way limits for future grade separation. Coordinated with adjacent landowners and City staff in development and finalizing project alternatives and preservation of right of way.

West Beltway Interchange Layouts at Ming Avenue, White Lane and Panama Lane, City of Bakersfield – Principal In Charge of design of preliminary interchanges, setting right of way limits and preparation for right of way plats and legal descriptions for City early acquisition of property.

Mohawk Street Extension North of Rosedale Highway, City of Bakersfield – Principal In Charge of design and utility coordination for extension of Mohawk Street north of Rosedale Highway, including signal modifications at Rosedale Highway, installation of 16” water pipeline, and arch culvert crossing of the Calloway Canal.

Hageman Road/Allen Road Grade Separation at BNSF Railway, Grade Separation District – Project Manager for all District activities regarding design review, traffic study for design parameters, right of way engineering and acquisition, utility coordination and relocation.

Page 458 of 494 ends

City of Shafter SOQ Page 16
Kevin L. Harmon, P.E.

Sr. Civil Engineer
Education: San Diego State University, 1991
Professional Registration: Professional Civil Engineer, California, C54800 Responsibilities/Experience:

Experienced Civil Engineer with a demonstrated history of success working for a small municipal government actively pursuing a diverse economy. Mr. Harmon joined the Ruettgers & Schuler Civil Engineers’ team in March, 2024. He understands commercial and residential land development, public street and utilities design, construction, and rehabilitation. He has a strong background in public works related design, construction, and contracting.

Project Experience, City Engineer, City of Shafter (2002-2024):
• Lead Engineer & CAD Drafter for numerous public projects including street, storm drain, water, sewer, fiber, & parks, all financed with local, state, and federal funding. • Lead Engineer & CAD Drafter for city owned commercial developments such as the COS Rail Yard, Alliance Ready Mix, and Williams Sonoma.
• Establish & update land development & construction standards for public streets, sewer, water, fiber, and stormwater.
• Review and approve public improvement plans & storm analyses for residential, commercial, and industrial developments such as the Gossamer Grove Development and Wonderful Industrial Park. • Review proposed developments, determine impacts on city infrastructure, draft conditions of approval, and recommend mitigations or alternate solutions. • Review, approve, and file for recordation tract maps, parcel maps, parcel map waivers, lot line adjustments, legal descriptions, and public dedications. • Participated in technical discussions and negotiations with California High Speed Rail regarding their design and route through the City of Shafter.
• Develop RFPs & establish contracts with outside consulting firms as needed. • Legally Responsible Person (LRP) for required stormwater pollution & prevention.

Project Experience, Staff Engineer, City of Shafter (1994 – 2002):
• Draft and develop construction plans & specifications for public works projects. • Project management including estimates, public bidding & contracting, construction inspection, tracking quantities, and acceptance.
• Projects include:
o Road construction, reconstruction, and asphalt overlay projects. o Concrete curb, gutter, and sidewalk improvements including ADA facilities. o Sewer improvements including lift stations.
o Water improvements including distribution, wells, tanks, & booster stations. o Stormwater improvements including storm analysis and basin sizing. o Public parks including grading, playgrounds, structures, and sports lighting. • Review and recommend for approval construction plans for residential, commercial, and industrial developments.

Page 459 of 494 ends

City of Shafter SOQ Page 17
Linda J. Hakimi, P.E.

Design Engineer
Education: BSCE, California State University, Sacramento, 1986 Professional Registration: Professional Registered Civil Engineer, California, C53094 Responsibilities/Experience:

Ms. Hakimi joined the firm of Ruettgers & Schuler in 2002. Since that time, she has provided design engineering services in railroad crossing nominations, pavement management studies, drainage studies and system design, traffic impact studies and preparation of Project Reports and Design Exception Fact Sheets for Caltrans projects. Ms. Hakimi is lead engineer for the preparation of traffic impact studies. Prior to joining Ruettgers & Schuler, Ms. Hakimi has worked for the City of Bakersfield Public Works Department since 1996, and for the Kern County Roads Department before that. While at the City of Bakersfield she oversaw the initiation, development and implementation of the City’s Pavement Management System. In addition to expertise in pavement management and inspection, she has also designed capital improvement projects including street widening/reconstruction and sewer lining.

Project Experience:

Railroad Grade Separations Nominations, Greater Bakersfield Separation of Grade District - Gathered vehicular, train, accident history and blocking delay data, evaluated crossing geometrics, and conducted interviews with railroad personnel in preparation for bi-annual PUC nominations. Prepared and submitted nominations applications/packages for PUC statewide grade separation ranking.

Traffic Impact Studies – Lead engineer for numerous traffic impact studies within the following Counties: Kern, Tulare, Fresno, Kings, Mariposa, San Luis Obispo, Los Angeles and San Bernardino.

Studies were prepared for the following types of developments: master planned communities, residential, commercial/retail, commercial office, alternative energy (Wind and Solar), industrial and school facilities. In addition to private development studies, reports were prepared for governmental agencies, including: Caltrans, City of Bakersfield and the County of Kern for new facilities analysis (interchange, freeway alignments, intersections) for design purposes.

Morning Drive at UPRR, Grade Separation District – Conducted right of way and utility investigations and prepared mapping for preliminary design and funding estimates. Prepared Benefit Cost Ratio study for federal funding application.

College Avenue Widening, City of Bakersfield – Lead design engineer for the widening of College Avenue west of Fairfax Road. Project included use of MSE wall to retain adjacent hillside and preparation of PS&E for wall and street widening improvements.

Page 460 of 494 ends

City of Shafter SOQ Page 18
Warren Maxwell, P.E.

Design Engineer
Professional Registration: Registered Civil Engineer, California 68104 WORK EXPERIENCE:
2023 – Present – Ruettgers & Schuler Civil Engineers
Technical advisor and QA/QC reviewer, on a variation of traffic studies and transportation related projects.

Preparation of various studiesPlan Review.
2021 – 2022 – Kern County Public Works Department
2021 – 2022 – Senior Engineering Manager – Extra Help (Development) Managed coordination, review, and revision of the $3 Billion Metropolitan Bakersfield Transportation Impact Fee Program in consultation with the City of Bakersfield, City of Shafter, and the Kern Council of Governments.

Reviewed and updated a substantial portion of the current edition of the Kern County Developments Standards. 1981 – 2019 – Kern County Public Works Department
2018 - 2019 Senior Engineering Manager - Development
Managed seven divisions, consisting of twenty-nine staff members responsible for review of subdivisions and other developments with regard to sewer, drainage, flood control, street design, traffic studies, traffic modeling, implementation of traffic impact fee programs and related plan check and inspection. Staff were also responsible for processing land divisions, office and field survey, GIS and CAD mapping, annexations, permits, street closings, dedications, vacations, and special districts. 2010 - 2018 Engineering Manager – Development Review Division Managed three divisions, consisting of eleven staff members responsible for review of subdivisions and other developments with regard to street design, traffic studies, traffic modeling, implementation of traffic impact fee programs and related plan check and inspection. Staff were also responsible for processing land divisions, office and field survey, GIS and CAD mapping, annexations, permits, street closings, dedications, and vacations.

Served as the Kern County Public Works representative at the Kern County Planning Commission. 2005 - 2010 Supervising Engineer – Development Review Division Supervised two staff members responsible for review of developments with regard to street design, traffic studies, traffic modeling, implementation of traffic impact fee programs and encroachment permit related plan check and inspection. Served as the Kern County Public Works Department representative at the Kern Council of Governments Regional Planning Advisory Committee and Kern County Planning Commission. 2002 - 2005 Engineer II/III - Development Review Division Reviewed development projects with regard to traffic studies, traffic modeling, and implementation of traffic impact fee programs. Served as the Kern County Public Works Department representative at the Kern Council of Governments Regional Planning Advisory Committee.
2000 - 2001 Engineer I – Design Division
Prepared engineered plans, specifications, and cost estimates for street improvement and maintenance related Public Works projects.
1981 - 2000 Engineering Aide/Drafting Technician/Engineering Technician – Field Survey/Drainage Division
Provided staff support for preliminary, topographic, retracement, and construction field surveys. Provided drafting and field related support for various drainage and flood control projects, and flood hazard review. Reviewed and approved drainage and grading plans, sewer and water plans, and performed landfill inspection throughout Kern County.

Page 461 of 494 ends

City of Shafter SOQ Page 19

TODD WOOD, DIRECTOR OF ENGINEERING

PROFESSIONAL ENGINEER
Mr Wood came from the Public Sector after serving 17 years with the Kern County Roads Department. Mr. Wood brings a wealth of experience with transportation improvement projects throughout Kern County and City of Bakersfield. Mr. Wood began his career with Kern County Roads in the Construction Division as a Resident Engineer where he administered construction contracts with scopes ranging from AC Overlays, Roadway Reconstruction, Traffic Signal Installation, as well as a Grade Separation projects. He rotated through the Roads Design Division, Major Projects Division, acted as the County Program Manager at TRIP, and was Engineering Manager of Maintenance and Design before leaving public service. He was the Engineer of Record for the 7th Standard Road at State Route 99 Interchange improvement project which was a Caltrans District 6 Oversight project. More recently, he was the Engineer of Record for the SR 43 and SR 46 Project Reports and Roadway PS&E packages in relation to the California High Speed Rail Construction Package 4 in Wasco, CA.

Relevant Experience:

Chinatown Urban Greening Grant, City of Fresno - Mr. Wood is the Engineer of Record responsible for the Project Plans, Specifications and Estimate Phase for this project. The project limits are located on F Street between Mariposa Street and Ventura Street, Kern Street between G Street and E Street and Mariposa Street between E Street and G Street.

The purpose of the project was to comply with TCC and City of Fresno requirements improving ADA facilities, installation of greening improvements, and installing lighting.

The project also included STI elements including the installation of LED streetlights on F Street from Fresno to Ventura Street and tree planting on F Street from Fresno Street to Mariposa Street. Reconstruction of Chia Alley included permeable pavement pavers and improved lighting.

Delano FY 19-20 SB 1 Local Streets and Road Resurfacing, City of Delano – Mr. Wood was Engineer of Record for the 354,000 SF Pavement Rehabilitation Project. The project limits are located on High Street from 21st Avenue to Cecil Avenue and on Jefferson Street from Cecil Avenue to Garces Highway. The project was a two-phase project that included cold planing the pavement surface, localized dig outs and replacement of the entire structural section where subgrade failure was occurring and an HMA overlay of the entire length of the roadway.

Haven Drive Pavement Rehabilitation Project, City of Arvin – Mr. Wood was Engineer of Record and Project Manager for the 2,890 LF Pavement Rehabilitation Project. The scope of this project included a pavement reclamation and overlay process that included pulverizing the existing surfacing, grading, and paving the entire roadway. The scope also included replacement of 1,900 LF of curb and gutter, 7,100 CY of sidewalk, replacement of three cross gutters and construction of 14 ADA curb ramps.

Registrations
Registered Professional Civil
Engineer, CA
No. 64410
Education
BS, Civil Engineering,
California State University
Fresno
Experience
27 Years
DeWalt Corporation
Director of Engineering,
2014 to Current
Kern County Roads
Department
Engineering Manager
1997-2014
Professional Affiliations
American Society of Civil
Engineers ASCE
American Council of
Engineering Companies
ACEC
American Public Works
Association APWA
California Stormwater Quality
Association CASQA

Page 462 of 494 ends

City of Shafter SOQ Page 20

BOB LUX

PROFESSIONAL LAND SURVEYOR
Mr. Lux is experienced in boundary and topographic surveying and the preparation of survey maps and legal descriptions. He has acquired over six years of skills, knowledge and experience through training and experience resulting in a team player with professionalism and integrity, self-motivation and hardworking with strong analytical, decision making and communication skills.

Mr. Lux has worked as a Survey Manager preparing survey calculations, corner records, record of surveys, easement maps, lot line adjustments, lot mergers and legal descriptions.

Additionally, he has worked with clients forming business relationships and has monitored client satisfaction. Mr. Lux is also proficient in AutoCAD Land Desktop and Civil 3D. While working in the field, he collected survey control points, set property boundary corners, performed topographic surveys and set panel points for aerial topography.

Under a contract basis, Mr. Lux performed as the in-house licensed land surveyor on Construction Package 4 for California Rail Builders. Mr. Lux reviewed daily construction surveying reports and ensured that the field crews were utilizing the established project control and monumentation. Mr. Lux also was instrumental in assisting CRB in preparing their project survey specifications in accordance with the Authorities requirements.

In 2015, Mr. Lux became a certified Professional Land Surveyor by the State of California. Mr. Lux is result-oriented, highly adaptable to new environments and increasing levels of responsibility, making him key personnel at DeWalt Corporation.

Registrations
PLS California
License no. 9222
Education
University of Portland
Portland, OR
Lassen Community College
Susanville, CA
Years of Experience
20

Page 463 of 494 ends

City of Shafter SOQ Page 21

ADAM STUBBS

DIRECTOR OF SURVEYING
Mr. Stubbs began his 20-year journey as a chainman. During those 20 years, he excelled as Project manager / Survey Coordinator for clients such as So Cal Gas PSEP Program, So Cal Gas Distribution, Chevron, Aera Energy, PG&E, CHSR CP 2-3 and CP 4,and many more. His hard work and dedication paid off when he was promoted to Director of Survey for DeWalt Corporation in 2019.

Mr. Stubbs worked for JES Engineering (2008-2012) as the lead party chief in their Kern County office, where he learned the ins and outs of the renewable energy sector for the industry by preforming all of the field work and assisting in the office work for pre-ALTA surveys, post-ALTA surveys, construction surveying, electrical line sag surveys for gen tie routes, setting of property corners for Record of Survey No. 3102, and coordination of field visits by lead engineers and construction teams for micro sighting on projects such as Pacific Wind, Avalon Wind, and Catalina solar.

Now, as the Director of Surveying for DeWalt Corporation his duties include various aspects within the Land Surveying department. Mr. Stubbs is responsible coordinating work performed by field crews, preparing proposals, working directly with clients, working with the engineering staff to update all projects, managing all personal of the survey department, along with normal day to day duties as the Director of Survey.

CHSR CP 2-3 and CP 4
As the Project Manager for DeWalt he managed all personnel of the survey department, coordinated work performed by field crews and worked directly with the client. Work involved: aerial target locations for LiDar flights, boundary resolution, topography of existing features, construction staking and construction as-built, post processing for aerial targets, 3D laser scan and processing, survey control network, existing easement plotting, new easement drafting, worked with rail authority to make sure all specifications were met per the survey standard, land appraisal exhibits, sub surface utility mark out, and generated as-built reports for bridge crossings and grading design. He also worked with the engineering staff to update the project and coordinate access for design surveys along railroad tracks, freeways, and private property. These tasks and many more were done along with his normal duties as Director of Surveying. Project value estimated at $750k.

Registrations
LSIT California
Education
Bakersfield High School
Bakersfield, CA
Years of Experience
20 Certifications
GPS Certified, System
Dividends, 2013
GSSI Certificate for GPR
Utility Location
Global Mapper Certificate

Page 464 of 494 ends

City of Shafter SOQ Page 22
Relevant Experience
The following project profiles and descriptions are representative of the types of projects R&S CE has accomplished through the years. Client references and contact information is provided on each project profile.

In addition to R&S project information, representative projects are included for subconsultant Dewalt Corporation.

Page 465 of 494 ends

City of Shafter SOQ Page 23
Owner: City of Bakersfield/Caltrans
Client: Parsons
Contact:

Project Cost: $1,750,000
(Local Signal/Lighting Only)
Project Dates: 2015-2024
Status: Substantially Completed
Contract: $275,000
As part of the Thomas Roads Improvement Program R&S was a subconsultant to the lead designer Parsons. R&S was responsible for preparation of PS&E for all the local traffic signal installation/modifications and street lighting installation/modifications that are required due to the new freeway connection. The Local Roads portion of the project was designed to City of Bakersfield and/or County of Kern Standards (a portion of the project is in County Right of Way). R&S is also responsible for coordination with the Caltrans freeway designers, structure designers, utility coordinators and wall designers to make sure that all portions of the work tie together. As part of the project R&S designed new lighting for areas without lighting, and modified existing lighting in areas which already had street lights. R&S designed several locations with lighting in the soffits of various bridges, with analysis of lighting coverage and internal conduit run design in the bridge and columns.

The intersection of Wible Road and Belle Terrace (Pictured below) required a complete new traffic signal design due to the raising of the road. The poles on the west side of the intersection required foundations to be deigned within the bridge deck. R&S additionally provided support and coordination for traffic control plans for early deliverable projects.

Centennial
Corridor Local
Traffic Signal &
Lighting Project
Relevance:
• Preparation of
PS&E for public
infrastructure
improvements
• Kern County and
Caltrans
Coordination
• Signal & Lighting
• Utility coordination
Key Personnel:

Ian Parks
Linda Hakimi
Matt Brash
Program Director
Parsons
661-326-3591
[email protected]

Page 466 of 494 ends

City of Shafter SOQ Page 24
Owner: City of Bakersfield
Client: City of Bakersfield
Contact:

Project Cost: $467,000
Retaining Wall
Project Dates: 2018-2020
Status: Completed
Contract: $50,000
R&S was retained by the City of Bakersfield to prepare street widening plans on College Avenue from Flintridge Drive to Fairfax Road. The project included the design of a retaining wall along the East Niles Community Services District (ENCSD) property. Multiple project alternatives were prepared to determine the most efficient, cost effective and permanent solution for both the City of Bakersfield and ENCSD.

Several design items were taken into consideration, including cost, height of the wall, wall type, slope, slope treatment, drainage and access to ENCSD property. Design alternatives were prepared and presented to both the City of Bakersfield and ENCSD for review and input.

It was determined, that in order to meet budget constraints and design parameters a Mechanically Stabilized Earth (MSE) retaining wall was chosen. Costs for the MSE wall were significantly less than a block retaining wall or cast in place concrete.

In addition to the wall and street improvement design, R&S acquired street right of way from ENCSD and temporary construction easements from the properties east and west of ENCSD. R&S also assisted in obtaining an encroachment permit from ENCSD.

Street
Improvements on
College Avenue
West of Fairfax
Road
Relevance:
• Preparation of
PS&E for public
infrastructure
improvements
• R/W acquisition
• Agency
Coordination
• Evaluation of Project
Alternatives
• Utility coordination
Key Personnel:

Ian Parks
Linda Hakimi
Aaron McWilliams
Civil Engineer III
City of Bakersfield
1501 Truxtun Avenue
Bakersfield, CA 93301
661-326-3591

Page 467 of 494 ends

City of Shafter SOQ Page 25
Owner: City of Delano
Client: City of Delano
Contact:

Project Cost: $650,000
Project Dates: 2020 to 2022
Status: Under Construction
Contract: $60,000
The City of Delano retained R&S to prepare PS&E for the 2020 ATP Gap Closure Project in various locations. The areas to receive improvements were located in decades old neighborhoods which had varying degrees of improvements and utilities. A challenging part of the project was to make sure that all existing conditions were accounted for and that the design of improvements matched existing, but also met current ADA requirements and design standards. A detailed topographic survey and site investigation was performed in order to identify all improvements and utilities. This allowed for the preparation of accurate plans and estimate of quantities for pay items.

The project included the following: approximately 46,400 SF of concrete sidewalks, 22 ADA curb ramps and bulb-outs, 18 driveway approaches, 2 Alley driveway approaches and ramps and 650 LF of curb and gutter along with roadway widening. City of Delano 2019 ATP3-SRTS Sidewalk Gap Closure Project ATPL-5227(060) Terrace Drive
Terrace Drive
City of Delano
ATP Gap Closure
Project
Relevance:
• PS&E for Public
Agency
• Federal Funding
• Utility coordination
• ADA design
Key Personnel:

Ian Parks
Linda Hakimi
Roman Dowling
Public Works Director
City of Delano
1015 Eleventh Avenue
Delano, CA 93216
(661) 720-2219

Page 468 of 494 ends

Owner: City of Tehachapi
Client: City of Tehachapi

Project Estimate: $3,100,000
Roundabout
Project Dates: 2023
Status: Complete
Contract: $27,000
The City of Tehachapi is intending to construct a roundabout at the intersection of Highline Road and Tucker Road. The City retained R&S to prepare a CMAQ application to be submitted to the Kern Council of Governments. R&S prepared the following:
• Roundabout layout and alternatives. Roundabout design was to a level that right-of-way could be defined. Engineer’s estimate of the roundabout. • Prepare various exhbits needed for the application
• Investigate collision information and document for the application • Prepare traffic and emissions calculations using SIDRA software • Prepare VMT reduction analysis
• Prepare bicycle and pedestrian analysis
• Prepare cost-effectiveness analysis
• Prepare right-of-way plats and legals for acquisition • Prepare complete application.

Tehachapi
Highline Rd &
Tucker Rd
Roundabout
CMAQ
Application
Relevance:
• Grant funding
application
• Feasibility Study
• Preliminary
roundabout layout
and cost estimate
• Traffic analysis
• Coordination with
KernCOG
• Plats and legal
descriptions
Key Personnel:

Ian Parks
Linda Hakimi

Contact Jay Schlosser
Development Services Director
115 S Robinson Street
Tehachapi, Ca. 93561
661-822-2200 Ext 115
[email protected]

Page 469 of 494 ends

City of Shafter SOQ Page 23
Owner: City of Delano
Client: City of Delano
Contact:

Project Cost: $3,000,000 (Construction
Estimate)
Project Dates: 2023
Status: Under Construction
Contract: $35,000
The City of Delano retained R&S to prepare a feasibility study for a realignment of High Street from the Union Pacific railroad underpass west to the Morse Boulevard alignment. High Street will go over State Route 99, and Glenwood Street will be realigned and go under High Street adjacent to State Route 99. R&S prepared the following work items in order to determine feasibility:
• Topographic survey of the limits of the project
• Prepare various alignment alternatives for High Street based on City of Delano standards
• Determine the bridge thickness and limits of the bridge • Prepare various profile alternatives for High Street based on City of Delano standards
• Prepare matrix of design alternatives and standards to determine if the project is feasible. The flyover was determined to be feasible and a summary document was prepared.
• The document was submitted to the City and Caltrans for review and comment • Caltrans determined that the project is feasible and Caltrans is in support • Prepared plats and legal descriptions for right-of-way acquisition • The City has retained R&S to prepare the Project Study Report for submittal to Caltrans and to aid in finding funding for the project

DOVER PARKWAY

MORSE BLVD
45' ROW

8.38 ACS

REMAINDER PARCEL B

12.75 GRS ACS

12.30 NET ACS

REMAINDER

PARCEL A

1.37 GRS ACS

1.13 NET ACS HWY 99
SPRR

GLENWOOD STREET

HIGH STREET
500'R
2:1 DAYLIGHT
SLOPE

EXISTING

LOT LINE

8.38 ACS
1 HIGH STREET FLYOVER

PLAN & PROFILE
City of Delano
High Street
Flyover
Feasibility Study
Relevance:
• PS&E for Public
Agency
• Federal Funding
• Utility coordination
• ADA design
• Plats and legal
descriptions for
right-of-way
acquisition
Key Personnel:

Ian Parks
Linda Hakimi
Roman Dowling
Public Works Director
City of Delano
1015 Eleventh Avenue
Delano, CA 93216
(661) 720-2219

Page 470 of 494 ends

City of Shafter SOQ Page 24
Owner: Kern County Public Works
Client: Kern County Public Works
Contact:

Project Cost: $5,500,000
Project Dates: 2019 through 2023
Status: Construction Complete
Contract: $327,000
2019 HSIP
R&S CE prepared the PS&E for intersection and sidewalk improvement at 82 intersections at various locations in the County, including Buttonwillow, various areas in Bakersfield, Oildale, Lamont and Rosamond. Improvements included new curb & gutter with asphalt tie-in, ADA curb ramps, drive approaches and sidewalk along existing curb & gutter. The project also included new sign and striping for pedestrian crossings. Various locations required modified or new light standards to enhance safety.

Several locations in areas such as northeast Bakersfield where existing roadways had slopes which required creative solutions to maintain ADA standards and slopes.

In addition to design, R&S investigated existing utilities and reviewed for conflicts and modified design to avoid conflict, or called out for utility relocation as needed.

The construction budget for the project was approximately $5.5 million.

Diane Dr & Esther Dr (Int #11, Oildale)

CROSSWALK IMPROVEMENTS AT VARIOUS UNCONTROLLED

INTERSECTIONS IN KERN COUNTY
Diane Dr & Margo Ln (Int #12, Oildale)

CONSTRUCTION NOTES LEGEND
CONSTRUCTION PLANS C-8
County of Kern
HSIP
Unsignalized
Intersection
Enhancement
Relevance:
• Preparation of
PS&E for public
infrastructure
improvements
• ADA Design and
improvements
• Utility coordination
Key Personnel:

Ian Parks

Josh Champlin
Kern County Public Works
Public Works Director
661-862-8844
[email protected]

Page 471 of 494 ends

City of Shafter SOQ Page 25
Owner: City of Tehachapi
Client: City of Tehachapi

Project Estimate: $1,100,000
Construction
Project Dates: 2019-2023
Status: Complete
Contract: $110,000
The UP Railroad cooridor through Tehachapi was not fenced, and the existing railroad crossings did not include consistent pedestrian or bicycle infrastructure. There were significant safety concerns for pedestrians crossing the tracks at uncontrolled locations. The City proposed a project to add security fencing along H Street to preclude crossing at locations other than controlled crossings, and upgrade the crossings to include bike and pedestrian facitlies, while upgrading the infrastructure to include medians, curb and gutter, sidewalk. The project also added trees along H Street to enhance the beauty of the cooridor. Railroad crossing signals were upgraded to include pedestrian indications. The project included significant coordination and work with the PUC and UPRR.

The project upgraded the following crossings:

1. Green Street

2. Hayes Street

3. Dennison Street
Fencing, curb & gutter and sidewalk were installed along H Street between Mill Street & its easterly terminus. Approximately 0.80 miles.

Tehachapi Blvd
ATP Railroad
Corridor Safety
Improvements
Relevance:
• Preparation of
Plans,
Specifications and
Estimate for
Street and
Railroad
Improvements
• Utility
Investigation
• Coordination with
Public Works and
Railroad staff
• ADA, Bicycle &
Pedestrian
facilities
• PUC Coordination
Key Personnel:

Ian Parks

Contact Jay Schloser
Development Services Director
115 S Robinson Street
Tehachapi, Ca. 93561
661-822-2200 Ext 115
[email protected]

Page 472 of 494 ends

City of Shafter SOQ Page 26
Owner: City of Shafter
Client: City of Shafter
Contact:

Construction Cost: $550,000
Project Dates: 2021-2022
Status: Construction Complete
Contract: $37,500
R&S was retained by the City of Shafter to prepare PS&E for the construction of a traffic signal at the intersection of 7th Standard Road and the West Beltway/Express Avenue, and also for the design of street lighting long the West Beltway/Express Avenue from 7th Standard Road north to Zachary Avenue, approximately 7,600 feet. While the traffic signal is within City of Shafter right of way, an agreement with the City of Bakersfield and the City of Shafter for operation of the signal is in place in which the City of Bakersfield will program and operate the signal. Review and approval was obtained for the signal by the City of Bakersfield in accordance with said agreement.

NORTHWEST 1/4
SECTION 33
T.28S. R.26E.

M.D.B.M.

FORMER ORCHARD

FALLOW LAND

NEW ORCHARD NEW ORCHARD
1 2
3 4
5 NORTHWEST 1/4
SECTION 33
T.28S. R.26E.

M.D.B.M.

NEW ORCHARD

FALLOW FIELD

HAY STORAGE
5 6
7 8
9 NEW ORCHARD

ORCHARD ORCHARD

NEW ORCHARD
10 11
9 12
13 ”
City of Shafter
Traffic Signal &
Street Lighting at
7th Standard Rd &
the West Beltway
Relevance:
• Preparation of
PS&E for Public
Works Project
• City of Shafter
and City of
Bakersfield
Coordination
• Traffic Signal &
Lighting Design
Key Personnel:

Ian Parks
John Schuler

Michael James
Public Works Director
City of Shafter
336 Pacific Avenue
Shafter, CA 93263
661-746-5002 ext. 5018

Page 473 of 494 ends

City of Shafter SOQ Page 27
Public Meetings and Input
R&S CE has experience with public meetings and gathering information from residents for use in design implementation and for planning purposes. Following are some representative examples of R&S CE experience.

Railroad Grade Separation Projects
R&S CE has typically conducted at least one public meeting/presentation for each of the grade separation projects that we have been involved in. For the meetings, R&S CE has prepared the presentation, including exhibits, detailed information about the projects and survey sheets for the public to record their input. R&S CE gathered the input and utilized in the design and implementation as appropriate.

Bike Plan Projects
R&S CE has been involved in public meetings for bike plan adoption projects in the City of Bakersfield and the City of Wasco. R&S CE was involved in the creation of the survey, preparation of exhibits and defining project information. Public input was tabulated and utilized in the preparation of the bike plans for both projects.

Project Schedule Examples
Cross Gutter Removal Curry Street & Valley Boulevard, City of Tehachapi The City of Tehachapi obtained a CMAQ grant to remove existing cross gutters and to install drainage facilities at the intersection of Curry Street and Valley Boulevard. The City retained R&S CE (with P&P as sub consultant) under our On-Call contract to prepare PS&E for the project. The grant had a deadline for submitting substantially complete plans to be funded. The schedule was very limited due to timing of the selection of OnCall consultants. R&S CE was immediately awarded the project and was able to fast track the work and determine the best performing and most cost-effective improvements for the intersection, and prepared PS&E within the required time frame. The funding budget was limited, and R&S CE was creative in finding solutions to the problems, while staying under budget. R&S CE was able to delete storm drain pipe and two inlets due to creative gutter grades and understanding of the local conditions. R&S CE completed the work with no contract change orders.

Realignment of the Friant Kern Canal and the Extension of Olive Drive at Calloway Drive, Bakersfield, California
This project involved realignment of 1,200' of the Friant-Kern Canal along with the construction of a 400', 24'X17' double box culvert structure, and the reconstruction of sections of Calloway Drive, and the extension of Olive Drive to the west. The City of Bakersfield retained R&S CE, along with Dokken Engineering as a subconsultant, to prepare the plans and assist in permitting and approval with the Friant Water Users Authority (FWUA) and Bureau of Reclamation. The City of Bakersfield had an opportunity to construct the project while the canal was dewatered and would not be able to construct for another three years if the plans and permitting were not completed in time. R&S CE managed the project and was able to prepare plans and obtain permits and utility relocation within the window needed to construct. R&S performed the work under budget and on time, and the relocation was completed within the dewatering window.

Page 474 of 494 ends

City of Shafter SOQ Page 28
Stallion Springs Community Services District (SSCSD), Kern County, California R&S CE has prepared road maintenance contracts for SSCSD since 1994, and has been responsible for performing pavement management services, project budget planning, preparation of PS&E and contract administration and inspections. SSCSD has a very limited seasonal period during which construction may be performed due to weather patterns at the higher elevations. R&S CE has historically prepared comprehensive schedules and budgets and planned the work to occur within the required window. R&S CE track record of successful projects is evidenced in our over 30 year association with the District.

Mohawk Street Construction, Bakersfield, California
The City of Bakersfield obtained a grant from the State for the construction of Mohawk Street from Rosedale Highway to Siena Lane. The City retained R&S CE and P&P as sub-consultant to design and manage the project from planning to construction. There were several complicated aspects to this project, including extensive utility relocation, including oil field facilities, and coordination with the current TRIP project on Rosedale Highway and permitting and approval with the North Kern Water Storage District. The deadline for the grant allowed less than one year for design and right of way clearance prior to construction. R&S CE and P&P were able to design the project and obtain a permit from Caltrans and North Kern WSD and manage the relocation of all utilities and oil field facilities in order to allow the construction to begin prior to the deadline set by the grant.

R&S CE stayed within budget and only had change orders for change in scope of work by outside influences.

Page 475 of 494 ends

City of Shafter SOQ Page 29
Financial Management & Accounting
We have reviewed each of the referenced sections of the Code of Federal Regulations and have considered the requirements. We have in place the proper methodologies to track and report personnel work hours and any additional materials and fees associated with the contract; having the capability to provide progress percentage-completed invoicing. We will maintain effective internal controls related to the proposed contract.

We are currently, (and in the past), working on multiple federally funded projects (including High Speed Rail) and adhere to the accounting principles required.

The statement applies to Dewalt Corporation also.

Page 476 of 494 ends

City of Shafter SOQ Page 30
Required Forms
The following forms are included in the SOQ.
• Sample agreement acceptance
• DIR Registration Information
• DIR Registration Certification
• Exhibit 10-Q
• Exhibit 10-U

Page 477 of 494 ends
Page 478 of 494 ends
Page 479 of 494 ends

-
-
-
B -
-
-
-
/RFDO$VVLVWDQFH3URFHGXUHV0DQXDO (;+%,74
'LVFORVXUHRI/REE\LQJ$FWLYLWLHV
(;+,%,74 ',6&/2685(2)/2%%<,1*$&7,9,7,(6
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352

1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offer/application a. initial
b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan For Material Change Only:
e. loan guarantee year ____ quarter _________
f. loan insurance date of last report __________

4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee, Enter Name and Address of Prime:

Prime Subawardee
Tier _______ , if known
Congressional District, if known Congressional District, if known

6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable ____________________

8. Federal Action Number, if known: 9. Award Amount, if known:

10. Name and Address of Lobby Entity 11. Individuals Performing Services (If individual, last name, first name, MI) (including address if different from No. 10) (last name, first name, MI)
(attach Continuation Sheet(s) if necessary)

12. Amount of Payment (check all that apply) 14. Type of Payment (check all that apply) $ _____________ actual planned a. retainer
b. one-time fee

13. Form of Payment (check all that apply): c. commission a. cash d. contingent fee
b. in-kind; specify: nature _______________ e deferred
Value _____________ f. other, specify _________________________

15. Brief Description of Services Performed or to be performed and Date(s) of Service, including officer(s), employee(s), or member(s) contacted, for Payment Indicated in Item 12:
(attach Continuation Sheet(s) if necessary)

16. Continuation Sheet(s) attached: Yes No

17. Information requested through this form is authorized by Title 31 U.S.C. Section 1352. This disclosure of lobbying reliance was placed by the tier above when his transaction was made or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This information will be reported to Congress
semiannually and will be available for public inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.

Signature: ________________________________________
Print Name: _______________________________________
Title: ____________________________________________
Telephone No.: ____________________ Date:___________
Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL
Standard Form LLL Rev. 04-28-06
Distribution: Orig- Local Agency Project Files

Page 1 ends

/33 0D\

Page 480 of 494 ends

Local Assistance Procedures Manual EXHIBIT 10-U
Consultant Management Conflict of Interest Statement
EXHIBIT 10-U CONSULTANT IN MANAGEMENT SUPPORT ROLE CONFLICT OF INTEREST AND C 1 ONFIDENTIALITY STATEMENT
5)35)4352&85(0(17180%(56
LIDSSOLFDEOH


352-(&71$0(
DQG)31LIDSSOLFDEOH



APPLICABILITY: To be filled out by local agency consultants in management support role. □ I am an employee of a consultant under contract to the local agency that is responsible for the procuring and administering of one or more consultant contracts containing either Federal or State funds.
□ I am in a management position with the local agency, my title is listed below and I have attached my duty statement and scope of work.
□ I hereby certify as follows:

1. I recuse myself from all potential conflicts of interest.

2. I will not directly or indirectly participate in, manage, or oversee any consultant selection procurement process in which the consulting firm of which I am employed is competing as a consultant or subconsultant.

3. I will not directly or indirectly influence any employee, staff member, or other individual participating in any consultant selection procurement process in which the consulting firm of which I am employed is as a consultant or subconsultant.

4. I will not directly or indirectly participate in, manage, or oversee any local agency contract that is with the consulting firm of which I am employed, regardless of whether the involvement of my employer in the contract is as a consultant or subconsultant.

Among other things, this includes my not being involved in approving changes in the schedule, scope, deliverables or invoices.

5. I understand that if I am involved in any local agency contract that is with the consulting firm of which I am employed, in violation of 1. or 2. above, that local agency contract will no longer be eligible for Federal or State reimbursement because of my involvement.
□ I certify that I have read and understand my responsibilities per 23 CFR 172.7(b)(5) □ I fully understand that it is unlawful for a person to utilize any organization name (i.e. local agency) or auxiliary organization information, which is not a matter of public record, for personal gain.
(DFKFRQVXOWDQWVWDIIZRUNLQJLQDPDQDJHPHQWVXSSRUWUROHVKDOOFRPSOHWHDVHSDUDWHIRUP )RURQFDOOFRQWUDFWVRUFRQWUDFWVIRUPXOWLSOHSURMHFWVLQGLFDWHDFFRUGLQJO\

Page 1 of 3 ends

January 2018

Page 481 of 494 ends

 
Local Assistance Procedures Manual EXHIBIT 10-U
Consultant Management Conflict of Interest Statement
□ I have read and fully understand all of the above.
'DWH
BBBBBBBBBBBBBBBBBB 6LJQDWXUH
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
1DPH
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
7LWOH
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
&RQVXOWDQW)LUP6ROH3URSULHWRU
BBBBBBBBBBBBBBBBBBBBBBBBBBBBB

REVIEWED BY PUBLIC WORKS DIRECTOR OR AUTHORIZED LOCAL AGENCY

REPRESENTATIVE
,KDYHUHYLHZHGWKHIRUHJRLQJ³&RQIOLFWRI,QWHUHVWDQG&RQILGHQWLDOLW\6WDWHPHQW´DQGZLOOHQVXUH 
Ƒ 7KDWWKHIRUHJRLQJQDPHGORFDODJHQF\FRQVXOWDQWZKRLVXQGHUFRQWUDFWDQGLQDPDQDJHPHQW VXSSRUWUROHZLWKRXUORFDODJHQF\DELGHVE\WKHIRUHJRLQJWHUPVDQGFRQGLWLRQV

Ƒ 7KDWVKRXOGWKHIRUHJRLQJQDPHGORFDODJHQF\FRQVXOWDQWZKRLVXQGHUFRQWUDFWDQGLQD PDQDJHPHQWVXSSRUWUROHZLWKRXUORFDODJHQF\YLRODWHDQ\RIWKHIRUHJRLQJWHUPVDQG FRQGLWLRQVWKH&DOWUDQV'/$(ZLOOEHQRWLILHGDQGVXFKYLRODWLRQZLOOEHFRQVLGHUHGDEUHDFK RIHWKLFVDQGFRXOGEHDEDVLVIRULQHOLJLELOLW\RI6WDWHRU)HGHUDOSURMHFWIXQGV Ƒ The procedures followed to procure and execute the contract, between the local agency and the consulting firm of which I am employed, comply with all federal and state requirements. Also this contract has a specific date from to .
'DWH
BBBBBBBBBBBBBBBBBB 6LJQDWXUH
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
1DPH
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
7LWOH
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
'HSDUWPHQW/RFDO$JHQF\
BBBBBBBBBBBBBBBBBBBBBBBBBBBBB

Page 2 of 3 ends

January 2018

Page 482 of 494 ends

Local Assistance Procedures Manual EXHIBIT 10-U
Consultant Management Conflict of Interest Statement

REVIEWED/CONCURRENCE BY FEDERAL HIGHWAYS
,KDYHUHYLHZHGWKHIRUHJRLQJ³&RQIOLFWRI,QWHUHVWDQG&RQILGHQWLDOLW\6WDWHPHQW´DQG VXSHUYLVRU¶VVWDWHPHQW
□ ,FRQFXUWKDWWKHFRQVXOWDQWZKRLVXQGHUFRQWUDFWDQGLQDPDQDJHPHQWVXSSRUWUROHZLWKWKH ORFDODJHQF\GRHVQRWDSSHDUWRSUHVHQWDFRQIOLFWRILQWHUHVW7KHORFDODJHQF\DQGWKH FRQVXOWDQWVKRXOGEHFRQVLGHUHGHOLJLEOHIRUIHGHUDOUHLPEXUVHPHQW □ ,GRQRWFRQFXUDV,EHOLHYHWKDWWKHFRQVXOWDQWZKRLVXQGHUFRQWUDFWDQGLQDPDQDJHPHQW VXSSRUWUROHZLWKWKHORFDODJHQF\GRHVDSSHDUWRSUHVHQWDFRQIOLFWRILQWHUHVW 'DWH
BBBBBBBBBBBBBBBBBB 6LJQDWXUH
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
1DPH
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3RVLWLRQ
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
Distribution: 
&RS\WR
'/$(IRUHDFK)HGHUDO6WDWHIXQGHGSURMHFW

&RS\WREHUHWXUQHGWR/RFDO$JHQF\E\'/$(ZLWK)+:$DSSURYDO

Page 3 of 3 ends

January 2018

Page 483 of 494 ends

Registrations 5/9/24, 4:18 PM
https://cadir.my.salesforce-sites.com/ContractorSearch/registrationSearchDetails?id=a1R8y000001uBtrEAE Page 1 of 2 Contractor Information
Legal Entity Name
Ruettgers & Schuler, Civil Engineers
Legal Entity Type
General Partnership
Status
Active
Registration Number
PW-LR-1000829066
Registration effective date
05/08/24
Registration expiration date
06/30/24
Mailing Address
1800 30th Street, Suite 260 Bakersfield 93301 CA …
Physical Address
1800 30th Street, Suite 260 Bakersfield 93301 CA …
Email Address
[email protected]
Trade Name/DBA
License Number (s)
Registration History
Effective Date    Expiration Date
10/03/21 06/30/22
05/08/24 06/30/24
Legal Entity Information
Partner name(s):

Partner Legal Name: Ian Parks
Partner Legal Entity Type: General Partnership
Partner Legal Name: John Schuler
Partner Legal Entity Type: General Partnership
Partner Legal Name: Sheila Plane
Partner Legal Entity Type: General Partnership
Worker's Compensation

Page 484 of 494 ends

Registrations 5/9/24, 4:18 PM
https://cadir.my.salesforce-sites.com/ContractorSearch/registrationSearchDetails?id=a1R8y000001uBtrEAE Page 2 of 2 Do you lease employees through Professional Employer Organization (PEO)?: No Please provide your current worker's compensation insurance information below:

PEO Information
PEO
Name
PEO
Phone
PEO
Email
Insured by Carrier
Policy Holder Name: Ruettgers
Insurance Carrier: Chubb Na
Policy Number: 10052
Inception date: 07/01/23
Expiration Date: 07/01/24

Page 485 of 494 ends
Page 486 of 494 ends

Local Assistance Procedures Manual EXHIBIT 10-U
Consultant Management Conflict of Interest Statement
EXHIBIT 10-U CONSULTANT IN MANAGEMENT SUPPORT ROLE CONFLICT OF INTEREST AND C 1 ONFIDENTIALITY STATEMENT
5)35)4352&85(0(17180%(56
LIDSSOLFDEOH


352-(&71$0(
DQG)31LIDSSOLFDEOH



APPLICABILITY: To be filled out by local agency consultants in management support role. □ I am an employee of a consultant under contract to the local agency that is responsible for the procuring and administering of one or more consultant contracts containing either Federal or State funds.
□ I am in a management position with the local agency, my title is listed below and I have attached my duty statement and scope of work.
□ I hereby certify as follows:

1. I recuse myself from all potential conflicts of interest.

2. I will not directly or indirectly participate in, manage, or oversee any consultant selection procurement process in which the consulting firm of which I am employed is competing as a consultant or subconsultant.

3. I will not directly or indirectly influence any employee, staff member, or other individual participating in any consultant selection procurement process in which the consulting firm of which I am employed is as a consultant or subconsultant.

4. I will not directly or indirectly participate in, manage, or oversee any local agency contract that is with the consulting firm of which I am employed, regardless of whether the involvement of my employer in the contract is as a consultant or subconsultant.

Among other things, this includes my not being involved in approving changes in the schedule, scope, deliverables or invoices.

5. I understand that if I am involved in any local agency contract that is with the consulting firm of which I am employed, in violation of 1. or 2. above, that local agency contract will no longer be eligible for Federal or State reimbursement because of my involvement.
□ I certify that I have read and understand my responsibilities per 23 CFR 172.7(b)(5) □ I fully understand that it is unlawful for a person to utilize any organization name (i.e. local agency) or auxiliary organization information, which is not a matter of public record, for personal gain.
(DFKFRQVXOWDQWVWDIIZRUNLQJLQDPDQDJHPHQWVXSSRUWUROHVKDOOFRPSOHWHDVHSDUDWHIRUP )RURQFDOOFRQWUDFWVRUFRQWUDFWVIRUPXOWLSOHSURMHFWVLQGLFDWHDFFRUGLQJO\

Page 1 of 3 ends

January 2018

Page 487 of 494 ends

10/13/22, 4:24 PM https://cadir.secure.force.com/ContractorSearch/PrintRegDetails https://cadir.secure.force.com/ContractorSearch/PrintRegDetails 1/10 Contractor Information
Legal Entity Name

DEWALT CORPORATION
Legal Entity Type
Corporation
Status
Expired
Registration Number
1000032842
Registration effective date
7/6/2018
Registration expiration date
6/30/2019
Mailing Address
1930 22ND STREET BAKERSFIELD 93301 CA Uni…
Physical Address
1930 22ND STREET BAKERSFIELD 93301 CA Uni…
Email Address
Trade Name/DBA
License Number(s)
Registration History
Legal Entity Information
Corporation Number:

Federal Employment Identification Number:

President Name:

JEFFREY GUTIERREZ
Vice President Name:

Treasurer Name:

Secretary Name:

CEO Name:

Agent of Service Name:

DEWALT CORPORATION
Agent of Service Mailing Address:
1930 22ND STREET BAKERSFIELD 93301 CA United States of America Workers Compensation
Effective Date Expiration Date
7/6/2018 6/30/2019
5/17/2017 6/30/2018
6/30/2016 6/30/2017
12/14/2015 6/30/2016
7/31/2019 6/30/2020
7/1/2020 6/30/2022
7/1/2022 6/30/2024
Do you lease employees
through Professional
Employer Organization
(PEO)?:

Please provide your
current workers

Page 488 of 494 ends

10/13/22, 4:24 PM https://cadir.secure.force.com/ContractorSearch/PrintRegDetails https://cadir.secure.force.com/ContractorSearch/PrintRegDetails 2/10 Contractor Information
Legal Entity Name

DEWALT CORPORATION
Legal Entity Type
Corporation
Status
Expired
Registration Number
1000032842
Registration effective date
5/17/2017
Registration expiration date
6/30/2018
Mailing Address
1930 22ND STREET BAKERSFIELD 93301 CA Uni…
Physical Address
1930 22ND STREET BAKERSFIELD 93301 CA Uni…
Email Address
Trade Name/DBA
License Number(s)
Registration History
Legal Entity Information
Corporation Number:

Federal Employment Identification Number:

President Name:

JEFFREY GUTIERREZ
Vice President Name:

Treasurer Name:

Secretary Name:

CEO Name:

Agent of Service Name:

DEWALT CORPORATION
Agent of Service Mailing Address:
1930 22ND STREET BAKERSFIELD 93301 CA United States of America compensation insurance
information below:

PEO Information
PEO
Name
PEO
Phone
PEO
Email
Insured by Carrier
Policy Holder Name:DEWALT CORPORATIONInsurance Carrier:

STATE COMPENSATION INSURANCE FUNDPolicy Number:9206452-2018Inception date:
3/10/2018Expiration Date:3/10/2019
Effective Date Expiration Date
7/6/2018 6/30/2019
5/17/2017 6/30/2018
6/30/2016 6/30/2017
12/14/2015 6/30/2016
7/31/2019 6/30/2020
7/1/2020 6/30/2022
7/1/2022 6/30/2024

Page 489 of 494 ends

Scope of Services
Ruettgers & Schuler Civil Engineers
SR 43 Pedestrian & Bicycle Improvement Project
Budget Summary
Description of Work Budget

1. Project Management $6,000

2. Site Investigation, Data Collection Record Research $7,500

3. Basemap (Including survey update) $17,500

4. Plan Preparation 30% $22,500

5. Plan Preparation 60% $15,000

6. Plan Preparation 90% $12,500

7. Final Plan and Bid Documents $10,000
Total Budget $91,000

Page 490 of 494 ends

Scope of Services
Ruettgers & Schuler Civil Engineers
North Shafter Transportation Improvements & Sustainability Plan Budget Summary
Description of Work Budget

1. Project Management $12,500

2. Site Investigation, Data Collection Record Research $17,500

3. Basemap (Including survey update) $22,500

4. Technical Studies $20,000

5. Prepare Alternative Layouts $40,000

6. Community Outreach $17,500

7. Draft Plan $35,000

8. Final Plan $20,000
Total Budget $185,000

Page 491 of 494 ends

MANAGEMENT REPORT

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: July 16, 2024
FROM: Gabriel A. Gonzalez, City Manager
PREPARED BY: Alex Gonzalez, Deputy Public Works Director SUBJECT: AWARD VETERANS PARK SOCCER FIELD LIGHTING PROJECT (#PK00012) TO INNOVATIVE ENGINEERING SYSTEMS, INC.,
DBA AGILITECH IN AN AMOUNT UP TO $800,000

RECOMMENDATION
Council find the action is exempt from the California Environmental Quality Act; authorize a reallocation of $100,000 in American Rescue Plan Act funding from Capital Improvement Program Project #PF00002 to Project #PK00012; authorize a General Fund budget appropriation of $300,000 Captial Improvement Program Project #PK00012; ratify staff determinations that (1) Unwired Broadband LLC’s bid is rejected on the basis of non-responsiveness and (2) Innovative Engineering Systems, Inc., dba Agilitech (“Agilitech”) is the lowest responsive bidder for the project; authorize the Deputy Public Works Director to issue a Notice of Award and Notice to Proceed to Agilitech and make all necessary findings in connection therewith; and authorize the Public Works Director to award up to $800,000 in project expenditures.

BACKGROUND
The Council authorized staff to release the Veterans Park Soccer Field Lighting Project for bidding purposes this past May. The project will install sports lighting for two soccer fields on the North end of Veterans Park. Four (4) bids were received and publicly opened on June 14. The bid results are as follows:

BIDDER BID
AMOUNT
UNWIRED BROADBAND LLC $618,869.27
INNOVATIVE ENGINEERING SYSTEMS, INC., DBA AGILITECH $719,383.00 DL BROWN INC. $778,100.00
AUDEAMUS, DBA SEBASTION $779,485.04

ANALYSIS

Page 492 of 494 ends

AWARD VETERANS PARK SOCCER FIELD LIGHTING PROJECT (#PK00012) TO INNOVATIVE ENGINEERING SYSTEMS, INC., DBA AGILITECH IN AN AMOUNT UP TO $800,000 - 2 -
After reviewing bids, staff determined that the apparent low bidder, Unwired Broadband LLC, failed to complete or submit two required forms: the list of subcontractors form and the bidder information and experience form. Additionally, a form to report relevant work experience is incomplete. These issues left the bid deemed non-responsive and led to the bid submitted by Innovative Engineering Systems, Inc., DBA Agilitech, which was the confirmed lowest responsive.

Provided Agilitech is awarded this project, an appropriate budget covering materials testing services is $800,000, which leaves approximately $80,000 in additional funding capacity. The forecasted breakdown for additional funds is $10,000 for construction materials testing services and $70,000 for general construction contingencies (approximately 10% of the base bid).

FISCAL IMPACT
Capital Improvement Project (CIP) #PK00012 currently has $400,000 in American Rescuse Plan Act (ARPA) funds allocated to it. Action by the Council is required to fund a project budget of $800,000. A reallocation of $100,000 in ARPA funding currently allocated to the Aquatic Center #PF00002, along with a General Fund appropriation of $300,000, is one option for budget action that would close the funding gap.

CEQA ANALYSIS
The project is exempt from CEQA per Section 15303 (New Construction or Conversion of Small Structures) of the CEQA Guidelines because it consists of the construction of limited numbers of new, small facilities or structures that are accessory to an existing use.

APPROVED BY THE CITY ATTORNEY
Not Applicable

ALTERNATIVES
An alternative to the requested action is to reject all bids and release the project for a new round of formal bidding. While this could result in a lower responsive bid amount, the City is facing a looming deadline to complete the project and expend the ARPA funds by the end of 2024. A new round of bidding would likely prevent the City from meeting this deadline. Therefore, alternative action is not recommended.

NEXT STEPS
Upon Council authorization, staff will issue a Notice of Award with a construction contract to Agilitech. It’s anticipated that construction will take place this fall.

ATTACHMENTS

1. BID RESULTS - Veterans Park Soccer Field Lighting Project

Page 493 of 494 ends

A.

ITEM DESCRIPTION QTY UNITS Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost A1 INSTALL SPORTS LIGHTING AND ALL RELATED ELECTRICAL WORK 1 LS $                      567,332.03 567,332.03 $                     494,460.00 $                     494,460.00 $                     629,000.00 $                     629,000.00 $                      557,244.00 $                     557,244.00 $                    A2 INSTALL ALL 1-1/2" & 2" PVC SCH 40 CONDUIT 1 LS $                        33,180.00 33,180.00 $                       141,391.00 $                     141,391.00 $                     84,000.00 $                        84,000.00 $                         68,213.00 $                        68,213.00 $                       A3 INSTALL ELECTRICAL BOXES PER DETAIL 2 ON SHEET E2.0 22 EA $                              18,357.24 834.42 $                       527.00 $                             11,594.00 $                       1,050.00 $                          23,100.00 $                         3,568.32 $                          78,503.04 $                       A4 MOBILIZATION 1 LS $                                    ‐ ‐ $                                    71,938.00 $                       71,938.00 $                       42,000.00 $                        42,000.00 $                         75,525.00 $                        75,525.00 $ Total Bid Price 618,869.27 $ Total Bid Price 719,383.00 $ Total Bid Price 778,100.00 $ Total Bid Price 779,485.04 $ Name Item Name Item Name Item Name Item
Total Western Inc. Civil Work Skycon Electric Electrical Skycon Electric Electrical ***All Bids are under Review
AUDEAMUS, DBA SEBASTIAN
Subcontractors
Indicates a difference between numbers written on the bid and as calculated using the unit prices. In the event of a discrepancy, the unit price prevails per the bid documents. Change in values did not affect the outcome of the bid.

Subcontractors
UNWIRED BB LLC
INNOVATIVE ENGINEERING SYSTEMS, INC., DBA
AGILITECH DL BROWN CONSTRUCTION INC.

PK00012 Veterans Park Soccer Field Lighting Project

LERDO HIGHWAY RECONSTRUCTION (WALL ST - SHAFTER AVE)
Subcontractors Subcontractors

Page 494 of 494 ends