Cities Index.
Agenda packet

Shafter City Council
June 3, 2025

Document
Agenda packet
Meeting
June 3, 2025
Body
Shafter City Council
Pages
510
Original file
40.9 MB
Text extracted from the city's file for reading and search. Open the original on shafterca.api.civicclerk.com. That file is the official record.

on such work to work in excess of eight hours in any calendar day or in excess of forty hoursin such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of eight hours in any calendar day or in excess of forty hoursin such workweek, whichever is greater. n. VIOLATION; LIABILITY FOR UNPAID WAGES; LIQUIDATED DAMAGES - In the event of any violation of the clause set forth in Section 5-3.01B(1) above, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractorshall be liable to the United States (in the case of work done under contract forthe District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damagesshall be computed with respectto each individual laborer or mechanic employed in violation of Section 5-3.01B(1), in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of eight hours or in excess of the standard workweek of forty hours without payment of the overtime wages required by Section 5-3.01B(1). o. WITHHOLDING FOR UNPAID WAGES AND LIQUIDATED DAMAGES - HUD or its designee shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld,from anymoneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other Federally-assisted contract subjectto the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor such sums as may be determine to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided inSection 5-3.01B(2) above. p. SUBCONTRACTS - The contractor or subcontractorshall insert in any subcontracts the clauses set forth in Sections 5-3.01B(1) through 5-3.01B(4)of these and also a clauserequiringthe subcontractors to include these clausesin any lowertiersubcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with provisions set forth in Sections 5-

3.01B(1) through 5-3.01B(4) of these .
q. HEALTH AND SAFETY -No laborer or mechanic shall be required to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous to his health and safety as determined under construction safety and health standards promulgated by the Secretary of Labor by regulation.

The Contractorshall comply with all regulationsissued by the Secretary of Labor pursuant to Title 29 Part 1926 and failure to comply may result in imposition of sanctions pursuant to the Contract Work Hours and Safety Standards Act, (40 USC 3701 et.seq.).

The Contractor shall include the provisions of this article in every subcontract so that such provisions will be binding on each subcontractor. The Contractor shall take such action with respect to any subcontract asthe Secretary of Housing and UrbanDevelopment orthe Secretary of labor shall direct as a means of enforcing such provisions.
r. CLEAN AIR AND WATER - The Contractor agreesto comply with all requirements of Section 114 of the Clean Air Act, (42 U.S.C. 7414) and Section 308 of the Clean Water Act, (33 U.S.C. 1318) relating to inspection, monitoring, entry, reports and information, as well as other requirements specified in Section114 and Section308 of the Air Act and the Water Act, and all regulations and guidelinesissued to implement those acts before award of this contract.

The Contractor agrees that no portion of the work required by this prime contract will be performed in a facility listed on the Environmental Protection Agency List of Violating Facilities on the date when this contract was awarded unless or until the EPA eliminates the name of such facility or facilities from such listing.
153

Page 293 of 510 ends

The Contractor agreesto use best efforts to comply with the clean air standards at the facility in which the contract is being performed.

The Contractor agreesto insert the substance of this clause into every nonexempt subcontract, including this paragraph.
s. EQUAL OPPORTUNITY CLAUSES (48 CFR 52.222-26) (Sept 2016) – (a) Compensation means any payments made to, or on behalf of, an employee or offered to an applicant as remuneration for employment, including but not limited to salary, wages, overtime pay, shift differentials, bonuses, commissions, vacation and holiday pay, allowances, insurance and other benefits, stock options and awards, profit sharing, and retirement.

Compensation information means the amount and type
of compensation provided to employees or offered to applicants, including, but not limited to, the desire of the Contractor to attract and retain a particular employee for the value the employee is perceived to add to the Contractor's profit or productivity; the availability of employees with like skills in the marketplace; market research about the worth of similar jobs in the relevant marketplace; job analysis, descriptions, and evaluations;salary and pay structures; salary surveys; labor union agreements; and Contractor decisions, statements and policies related to setting or altering employee compensation.

Essential job functions means the fundamental job duties of the employment position an individual holds. A job function may be considered essential if - (1) The accessto compensation information is necessary in orderto perform thatfunction or another routinely assigned business task; or
(2) The function or duties of the position include protecting and maintaining the privacy of employee personnel records, including compensation information.

Gender identity has the meaning given by the Department of Labor's Office of Federal Contract Compliance Programs, and is found at www.dol.gov/ofccp/LGBT/LGBT_FAQs.html.

Sexual orientation has the meaning given by the Department of Labor's Office of Federal Contract Compliance Programs, and is found at www.dol.gov/ofccp/LGBT/LGBT_FAQs.html.

United States means the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island. (b)
(1) If, during any 12-month period (including the 12 months preceding the award of this contract), the Contractor has been or is awarded nonexempt Federal contracts and/or subcontracts that have an aggregate value in excess of $10,000, the Contractor shall comply with this clause, except for work performed outside the United States by employees who were not recruited within the United States. Upon request, the Contractor shall provide information necessary to determine the applicability of this clause.
(2) If the Contractor is a religious corporation, association, educational institution, or society, the requirements of this clause do not apply with respect to the employment of individuals of a particular religion to perform work connected with the carrying on of the Contractor's activities (41 CFR 60-1.5).
(c)
(1) The Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. However, it shall not be a violation of this clause for the Contractor to 154

Page 294 of 510 ends

extend a publicly announced preference in employment to Indians living on or near an Indian reservation, in connection with employment opportunities on or near an Indian reservation, as permitted by 41 CFR 60-1.5.
(2) The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. This shall include, but not be limited to, (i) employment, (ii) upgrading, (iii) demotion, (iv) transfer, (v) recruitment or recruitment advertising, (vi) layoff or termination, (vii) rates of pay or other forms of compensation, and (viii) selection for training, including apprenticeship
(3) The Contractor shall post in conspicuous places available to employees and applicants for employment the notices to be provided by the Contracting Officer that explain this clause. (4) The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.
(5)
I. The Contractor shall not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This prohibition against discrimination does not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the Contractor's legal duty to furnish information.

II. The Contractor shall disseminate the prohibition on discrimination in paragraph (c) (5) (i) of this clause, using language prescribed by the Director of the Office of Federal Contract Compliance Programs (OFCCP), to employees and applicants by –
a. Incorporation into existing employee manuals or handbooks; and b. Electronic posting or by posting a copy of the provision in conspicuous places available to employees and applicants for employment.
(6)The Contractor shall send, to each labor union or representative of workers with which it has a collective bargaining agreement or other contract or understanding, the notice to be provided by the Contracting Officer advising the labor union or workers' representative of the Contractor's commitments under this clause, and post copies of the notice in conspicuous places available to employees and applicants for employment.
155

Page 295 of 510 ends

(7) The Contractor shall comply with Executive Order 11246, as amended, and the rules, regulations, and orders of the Secretary of Labor. (8) The Contractor shall furnish to the contracting agency all information required by Executive Order 11246, as amended, and by the rules, regulations, and orders of the Secretary of Labor. The Contractor shall also file Standard Form 100 (EEO-1), or any successor form, as prescribed in 41 CFR part 60-1. Unless the Contractor hasfiled within the 12months preceding the date of contract award, the Contractor shall, within 30 days after contract award, apply to either the regional Office of Federal Contract Compliance Programs (OFCCP) or the local office of the Equal Employment Opportunity Commission for the necessary forms..
(9) The Contractor shall permit access to its premises, during normal business hours, by the contracting agency or the OFCCP for the purpose of conducting on-site compliance evaluations and complaint investigations. The Contractor shall permit the Government to inspect and copy any books, accounts, records (including computerized records), and other material that may be relevant to the matter under investigation and pertinent to compliance with Executive Order 11246, as amended, and rules and regulations that implement the ExecutiveOrder.
(10) If the OFCCP determines that the Contractor is not in compliance with this clause or any rule, regulation, or order of the Secretary of Labor, this contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts, under the procedures authorized in Executive Order 11246, as amended. In addition, sanctions may be imposed and remedies invoked against the Contractor as provided in Executive Order 11246, as amended; in the rules, regulations, and orders of the Secretary of Labor; or as otherwise provided by law.
(11) The Contractor shall include the terms and conditions of this clause in every subcontract or purchase order that is not exempted by the rules, regulations, or orders of the Secretary of Labor issued under Executive Order 11246, as amended, so that these terms and conditions will be binding upon each subcontractor or vendor. (12) The Contractor shall take such action with respect to any subcontract or purchase order as the Director of OFCCP may direct as a means of enforcing these terms and conditions, including sanctions for noncompliance; provided, that if the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of any direction, the Contractor may request the United States to enter into the litigation to protect the interests of the United States. (d) Notwithstanding any other clause in this contract, disputes relative to this clause will be governed by the procedures in 41 CFR part 60-1.
t. GOALS AND TIMETABLES FOR MINORITY AND FEMALE PARTICIPATION - Bidder’s attention is called to the “Equal Opportunity Clause” and the “Standard Federal Equal Employment Opportunity Construction Contract Specifications” set forth herein.

The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
156

Page 296 of 510 ends

Timetables
Goals for minority
participation for each trade
Goals for female
participation for each trade

19.1 Percent 6.9 Percent
These goals are applicable to all the Contractor’s construction work (whether or not it is Federal or federally assisted) performed in the covered area.

The Contractor’s compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals established for the geographical area where the contract resulting from this solicitation is to be performed. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address and telephone number of the subcontractor; employer identification number; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the contract is to be performed. 157

Page 297 of 510 ends

u. UTILIZATION OF SMALL BUSINESS CONCERNS (48 CFR 52.219-8) (Sep 2023) – (a) Definitions. As used in thiscontract —
HUBZone small business concern means a small business concern that meets the requirements described in 13 CFR 126.200, certified by the Small Business Administration (SBA) and designated by SBA as a HUBZone small business concern in the Dynamic Small Business Search (DSBS) and SAM.

Service-disabled veteran-owned small business concern—
(1) Means a small business concern-
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran. (2) Service-disabled veteran means a veteran, as defined in 38 U.S.C.101(2), with a disability that is service-connected, as defined in 38 U.S.C.101(16).

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation and qualified as a small business under the criteria and size standards in 13 CFR part 121, including the size standard that corresponds to the NAICS code assigned to the contrac t or subcontract.

Small disadvantaged business concern, consistent with 13 CFR 124.1001, means a small business concern under the size standard applicable to the acquisition, that- (1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by- (i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States; and
(ii) Each individual claiming economic disadvantage has a net worth not exceeding the threshold at 13 CFR 124.104(c)(2) after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and
(2) The management and daily business operations of which are controlled (as defined at 13.CFR 124.106) by individuals, who meet the criteria in paragraphs (1)(i) and (ii) of this definition.

Veteran-owned small business concern means a small business concern- (1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C.101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and
(2) The management and daily business operations of which are controlled by one or more veterans.

Women-owned small business concern means a small business concern- (1) That is at least 51 percent owned by one or more women, or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more women; and (2) Whose management and daily business operations are controlled by one or more women. (b) It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is further the policy of the United States that its prime contractors establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts with small business concerns, 158

Page 298 of 510 ends

veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns.
(c)
(1) A joint venture qualifies as a small business concern if— (i) Each party to the joint venture qualifies as small under the size standard for the solicitation; or (ii) The protégé is small under the size standard for the solicitation in a joint venture comprised of a mentor and protégé with an approved mentor-protégé agreement under a SBA mentorprotégé program. (2) A joint venture qualifies as—
(i) A service-disabled veteran-owned small business concern if it complies with the requirements in 13 CFR part 125; or
(ii) A HUBZone small business concern if it complies with the requirements in 13 CFR 126.616(a) through (c).
(d) The Contractor hereby agrees to carry out this policy in the awarding of subcontracts to the fullest extent consistent with efficient contract performance. The Contractor further agrees to cooperate in any studies or surveys as may be conducted by the United States Small Business Administration or the awarding agency of the United States as may be necessary to determine the extent of the Contractor's compliance with this clause. (e)
(1) The Contractor may accept a subcontractor's written representations of its size and socioeconomic status as a small business, small disadvantaged business, veteran-owned small business, service-disabled veteran-owned small business, or a women-owned small business if the subcontractor represents that the size and socioeconomic status representations with its offer are current, accurate, and complete as of the date of the offer for the subcontract. (2) The Contractor may accept a subcontractor's representations of its size and socioeconomic status as a small business, small disadvantaged business, veteran-owned small business, servicedisabled veteran-owned small business, or a women-owned small business in the System for Award Management (SAM) if–
(i) The subcontractor is registered in SAM; and
(ii) The subcontractor represents that the size and socioeconomic status representations made in SAM are current, accurate and complete as of the date of the offer for the subcontract. (3) The Contractor may not require the use of SAM for the purposes of representing size or socioeconomic status in connection with a subcontract.
(4) In accordance with 13 CFR 121.411, 126.900, 127.700, and 128.600, a contractor acting in good faith is not liable for misrepresentations made by its subcontractors regarding the subcontractor's size or socioeconomic status.
(5) The Contractor shall confirm that a subcontractor representing itself as a HUBZone small business concern is certified by SBA as a HUBZone small business concern by accessing SAM or by accessing DSBS at https://web.sba.gov/pro-net/search/dsp_dsbs.cfm. If the subcontractor is a joint venture, the Contractor shall confirm that at least one party to the joint venture is certified by SBA as a HUBZone small business concern. The Contractor may confirm the representation by accessing SAM.
v. COMPLIANCE WITH THE REHABILITATION ACT OF 1973 - The Contractor shall comply with the requirements of 41CFR 60-741, which are incorporated by reference in this contract. w. EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (48 CFR 52.222-36) (JUN 2020) – (a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal 159

Page 299 of 510 ends

opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR)

33.1408(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
x. EQUAL OPPORTUNITY FOR VETERANS (48 CFR 52.222-35) (JUN 2020) – (a) Definitions. As used in this clause -
“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at Federal Acquisition Regulation (FAR) 22.1301. (b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts valued at or above the threshold specified in FAR 22.1302(a) on the date ofsubcontract award, unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
y. EMPLOYMENT REPORTS ON VETERANS (48 CFR 52.222-37) (Jun 2020) a) Definitions. As used in this clause, "active duty wartime or campaign badge veteran," "Armed Forces service medal veteran," "disabled veteran," "protected veteran," and "recently separated veteran," have the meanings given in Federal Acquisition Regulation (FAR)22.1301. (b) Unless the Contractor is a State or local government agency, the Contractor shall report at least annually, as required by the Secretary of Labor, on- (1) The total number of employees in the contractor’s workforce, by job category and hiring location, who are protected veterans (i.e., active duty wartime or campaign badge veterans, Armed Forces service medal veterans, disabled veterans, and recently separated veterans); (2) The total number of new employees hired during the period covered by the report, and of the total, the number of protected veterans (i.e., active duty wartime or campaign badge veterans, Armed Forces service medal veterans, disabled veterans, and recently separated veterans); and
(3) The maximum number and minimum number of employees of the Contractor or subcontractor at each hiring location during the period covered by the report. (c) The Contractor shall report the above items by filing the VETS-4212 "Federal Contractor Veterans’ Employment Report" (see "VETS-4212 Federal Contractor Reporting" and "Filing Your 160

Page 300 of 510 ends

VETS-4212 Report" at http://www.dol.gov/vets/vets4212.htm). (d) The Contractor shall submit VETS-4212 Reports no later than September 30 of each year. (e) The employment activity report required by paragraphs (b)(2) and (b)(3) of this clause shall reflect total new hires, and maximum and minimum number of employees, during the most recent 12–month period preceding the ending date selected for the report. Contractors may select an ending date-
(1) As of the end of any pay period between July 1 and August 31 of the year the report is due; or
(2) As of December 31, if the Contractor has prior written approval from the Equal Employment Opportunity Commission to do so for purposes of submitting the Employer Information Report EEO-1 (Standard Form 100).
(f) The number of veterans reported must be based on data known to the contractor when completing the VETS-4212. The contractor’s knowledge of veterans status may be obtained in a variety of ways, including an invitation to applicants to self-identify (in accordance with 41 CFR 60-300.42), voluntary self-disclosure by employees, or actual knowledge of veteran status by the contractor. This paragraph does not relieve an employer of liability for discrimination under 38 U.S.C.4212.
(g) The Contractor shall insert the terms of this clause in subcontracts valued at or above the threshold specified in FAR 22.1303(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary of Labor.
z. ARCHITECTURAL BARRIERS ACT OF 1968 - This project is subject to the requirements of the Architectural Barriers Act of 1968 (42 U.S.C. 4151-4157), as amended, and shall comply with the Uniform Federal Accessibility Standards (appendix A to 24 CFR part 40 for residential structures, and appendix A to 41 CFR part 101-19,subpart 101-19.6 for generaltype buildings) which require Federal and Federally funded buildings and other facilities be designed, constructed, or altered in accordance with standards that insure accessibility to, and use by, individuals with physical disabilities. aa. AMERICANS WITH DISABILITIES ACT OF 1990 - CDBG contractors and subcontractors agree to abide by the requirements of the American with Disabilities Act of 1990, Public Law 101- 336, and any regulations issued pursuant thereto, which prohibits, at Title I thereof, discrimination by any employer, employment agency, or labor origination against any qualified individual with a disability in regard to any term, condition, or privilege of employment; makes applicable, at Title II thereof, the prohibition against discrimination on the basis of disability to all programs, activities and services provided or made available by state and local agencies or instrumentalities or agencies thereof, or by public entities that provide public transportation; prohibits, at Title III thereof, disabilities discrimination by privately operated public accommodations and in public transportation services provided by private entities; and which, at Titles IV and V thereof, makes further provision against discrimination against disabled persons.
bb. NONDISCRIMINATION ON BASIS OF AGE POLICY - It isthe policy ofthe Executive Branch of the Governmentthat (a) contractors and subcontractors engaged in the performance of Federal contracts shall not, in connection with the employment, advancement, or discharge of employees, or in connectionwith the terms, conditions, or privileges of their employment, discriminate against persons because of their age except upon the basis of a bona fide occupational qualification, retirement plan, or statutory requirement, and (b) that contractors and subcontractors, or persons acting on their behalf, shall not specify, in solicitations or advertisements for employees to work on Government contracts, a maximumage limit for such employment unlessthe specified maximum age limit is based upon a bona fide occupational qualification, retirement plan, or statutory requirement. 161

Page 301 of 510 ends

G:\Shafter City of- 3846\384625001-CDBG Bid Package\200 Technical\290 Specifications\Shafter Library\D. 4. EEO clause.doc

EQUAL EMPLOYMENT OPPORTUNITY CLAUSE
During the performance of this contract, the contractor agrees as follows:
(1) The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following:
employment, upgrading, demotion or transfer, recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause.
(2) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. (3) The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the Contract Compliance Officer, advising the labor union or worker's representative of the contractor's commitments under this section and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
(4) The contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. (5) The contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the Department and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (6) In the event of the contractor’s noncompliance with the nondiscrimination clauses of this contract or with any of such rules, regulations, or orders, this contract may be cancelled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order No. 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. (7) The contractor will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor.

The contractor will take such action with respect to any subcontract or purchase order as the Department may direct as a means of enforcing such provisions including sanctions for noncompliance: provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the Department, the contractor may request the United States to enter into such litigation to protect the interests of the United States. 162

Page 302 of 510 ends

10/00 EEA-1

PLAN FOR

EQUAL EMPLOYMENT OPPORTUNITY
AND

AFFIRMATIVE ACTION
UNDER EXECUTIVE ORDER 11246
163

Page 303 of 510 ends

10/00 EEA-2
EXECUTIVE ORDER 11246

EQUAL EMPLOYMENT OPPORTUNITY
Effective
Effective Date Name of Company
developed an affirmative
Action plan for equal employment opportunity.

I. Statement of Policy:In order to provide equal employment opportunities to all qualified persons without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, or disability, this firm agrees to do the following: (1) recruit, hire, train, and promote persons in all job titles, without regard to race, color, religion, sex, sexual orientation, gender identity, nation origin, or disability, (2) base decisions on employment so as to further the principle of equal employment opportunity, (3) ensure that promotion decision are in accord with principles of equal employment opportunity by imposing only valid requirements for promotional opportunities, (4) ensure that all personnel actions , including but not limited to compensation, benefits, transfers, lay-offs, return from layoffs, firm sponsored training , education, tuition assistance, social and recreational programs, will be administered without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, or disability.

11. Responsibility for the Program: will
Name and Title of Person
Personally oversee the program and will appoint _ _ _ _ _ _ _ _ _ Name and Title of Person
As the Equal Employment Opportunity Officer (hereinafter referred to as the EEO Officer) to carry out the program. The EEO Officer is hereby given full authority to carry out the program and is given the responsibility and authority to:

A Develop policy statements and internal and external communication procedures.

B. Assist line management in collecting and analyzing employment data, identifying problem areas, setting goals and timetables and developing programs to achieve goals.

C. Design, implement and monitor internal audit and reporting systems to measure program effectiveness and to determine where progress has been made and where further action is needed and, if necessary, to assure that such action is taken.
164

Page 304 of 510 ends

1 0/00 EEA-3
D. Repo rt, at least quarterly, to the firm's owners on the progress of each unit in relation to company goals.

E. Serve as liaison between the company, government regulatory agencies, minority and female organizations and other community groups.

F. Assure that current legal information affecting affirmative action is disseminated to responsible officials.

G. Assure that all test and selection criteria required to employment with the firm have been validated (where there is an obligation to do so) as per 41 CFR Part 60-3.
111. Dissemination of Policy
A. International Dissemination of Policy: In order to disseminate the EEO Policy to all members of the company staff who are authorized to hire, supervise, promote and discharge employees, or who recommend such action, the firm will take the following steps:

1. Include the policy in the firm's policy manual;

2. Publicize the policy in firm newspapers, magazines, annual reports, and other available media devices ;

3. conduct, at least annually, special meetings with executive , management , and supervisory personnel to explain the intent of the policy and individual responsibility for its effective implementation, and making clear the firm's commitment to its affirmative action obligations;

4. Conduct a review, at least annually, of all supervisors' adherence to and performance under the firm's EEOpolicies and affirmative action obligations;

5. Schedule, at least annually, special meetings with all other employees to discuss policy and explain individual employee responsibilities;

6. Discuss the policy thoroughly in both employee orientation and management training programs;

7. Meet with union officials as appropriate to inform them of the policy, and to request their cooperation;
165

Page 305 of 510 ends

I 0/00 EEA-4

8. Include nondiscrimination clauses in any union agreements , and review all contractual provisions to ensure they are nondiscriminatory;

9. Publish articles in firm publications covering EEO programs, progress reports, promotions to ensure they are
nondiscriminatory;

10. Post policy on the firm's bulletin boards;

11. Inform employees of the existence of the firm's affirmative action policy and enable employees to avail themselves of its benefits;

12. Maintain a working environment free of harassment,
intimidation , and coercion at all sites and in all facilities at which this firm's employees are assigned to work. This firm shall specifically ensure that all foremen, superintendents, and other onsite supervisory personnel are aware of and carry out the firm's obligation to maintain such a working environment, which specific attention to minorities or females working at such sites or in such facilities .

B. External Dissemination of Policy: In order to make the firm's Equal employment Opportunity Policy known to all employees, prospective employees, and potential sources of employees, such as schools , employment agencies , labor unions, and college placement offices, the firm will take the following actions:

1. Inform all recruitment sources verbally and in writing of the firm's policy, stipulating that these sources actively recruit and refer minorities and females for all positions listed;

2. Incorporate the equal opportunity clause in all purchase orders, leases, and contracts covered by Executive Order 11246, as amended, and its implementing regulations;

3. Notify in writing, minority and female organizations , community agencies, community leaders, secondary
schools, and colleges of the firm's policy;

4. Inform prospective employees of the existence of the firm's affirmative action policy and enable such prospective
employees to avail themselves of its benefits;
166

Page 306 of 510 ends

10 /00 EEA-5

5. Send written notification of the firm's policies to all subcontractor, vendors , and suppliers with requests for appropriate action on their part.

IV. Sexual Harassment - Definition and Policy:

It is the policy of this firm to maintain a work place free of sexual harassment, intimidations and coercion. All allegations of sexual harassment will be fully reviewed. Disciplinary action will be taken against any employee found to have sexually harassed another employee. Sexual harassment is defined as, but not limited to:

Any repeated or unwarranted verbal, visual or physical sexual action, sexually explicit derogatory statement or remark of a sexual nature made by someone in the work place which can be reasonably determined by the recipient and the persons(s) reviewed the complaint to be offensive or objectionable or which may cause the recipient or anyone in the immediate area discomfort or humiliation.

The firm will investigate all complaints of alleged sexual harassment in connection with its obligations under its contracts, will attempt to resolve such complaints, and will take appropriate corrective action. If the investigation indicates that the sexual harassment may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the firm will inform the complainant of its finding and of all avenues of appeal within thirty (30) days of receiving thecomplaint.

To minimize the occurrence of sexual harassment in the work place, and to ensure that all employees understand that such actions will not be tolerated , managers and supervisors shall distribute the policy to every employee and periodically reinforce the importance of compliance.

V. Utilization of Minorities and Females: The firm will make a good faith effort to meet the designated goals set for the by the Office of Federal contract Compliance Programs (OFCCP) for utilizing minorities and females in the various crafts on all construction jobs during the time this contractor has a federally-assisted or direct federal construction contract.

A. Recruitment

1. When advertising for employees, the firm will include in all advertisements for employees the notation: "A Equal
Opportunity Employer". The firm will insert advertisements in newspapers or other publications having a large circulation among minority and female groups in the area from which the firm's workforce would normally be derived.
167

Page 307 of 510 ends

1 0/00 EEA-6

2. The firm will conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minority group applicants, including, by not limited to, state employment agencies, schools, college, and minority group organizations . To meet these requirements, the firm will, through the EEO Officer, identify sources of potential minority and female group employees and establish procedures whereby applicants may be referred to the firm for employments consideration.

3. The firm will encourage its present employees to refer minority and female group applicants for employment by posting
appropriate notices or bulletins in areas accessible to all such employees
B. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel action of every type, including hiring, upgrading, promotion , transfer, demotion, layoff, leave of absence, and termination , will be taken without regard to race, color, religion, sex, sexual orientation, gender identity, national origin or disability. The following procedures will be followed:

1. Periodic inspection of object sites will be conducted to ensure that working conditions and employee facilities do not allow discriminatory treatment of project sitespersonnel.

2. The spread of wages paid within each classification will be periodically evaluated to determine any evidence of
discriminatory wage practices.

3. The firm will periodically review selected personnel actions in depth to determine whether there is evidence of
discrimination. Where evidence is found, the firm will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons.

4. The firm will investigate all complaints of alleged
discrimination in connection with its obligations under its contracts, will attempt to resolve such complaint, and will take appropriate corrective action. If the investigation indicates that the discrimination may affect persons other that the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the firm will inform the complainant of its finding and of all
168

Page 308 of 510 ends

10/00 EEA-7
avenues appeal within thirty (30) days of receiving the complaint.

C. Training and Promotion

1. The firm will assist in locating, qualifying and increasing the skills of minority and female employees and applicants for employment.

2. Consistent with its requirements and as permissible under Federal and State regulations, the firm will make full use of training programs, such as pre-apprenticeship,
apprenticeship, or on-the-job training programs, for the geographical area of contract performance.

3. To the greatest extent possible, the firm will advise employees and applicants for employment of available
training programs and entrance requirements for such
programs.

4. The firm will review, at least annually, the training and promotion potential of minority and female employees and will encourage eligible employees to apply for such training and promotion.

D. Unions: The firm will use its best efforts to obtain the cooperation of any unions with which it has collective bargaining relationships to increase minority and female opportunities within the unions, and to effect referrals of minority and female employees by such unions.

1. The firm will cooperate with unions, as appropriate, to develop joint training programs aimed at qualifying more minority and female employees for membership in the unions and
increasing the skills of minority and female employees so that they may have the opportunity to qualify for higher paying employment.

2. The firm will encourage the incorporation of an equal employment opportunity clause into any union agreements stating that such unions will be bound contractually to refer applicants without regard to race, color, religion, sex, sexual orientation, gender identity national origin, or disability.

3. In the event a union is unable to refer minority and female applicants as requested by the firm within the time limit set forth in a union agreement, the firm will, through its own 169

Page 309 of 510 ends

10/00 EEA-8
recruitment procedures, fill the employment vacancies without regard to race, color religion, sex, sexual orientation, gender identity, national origin, or disability, making every effort to obtain qualifiedminority and female employees.

4. the firm will provide immediate written notification to the director of the OFCCP when a union with which it has a collective bargaining agreement falls to refer a minority or female, or when the firm has other information that the union referral process is impeding its efforts to meet itsobligations.

VI. Subcontracting: When required by federal contract the firm will use its best effort to utilize determine if the firm is a bona fide Minority Business Enterprise.

A. The firm will document and maintain a record of all solicitations or offers for subcontracts from minority and female construction contractors and suppliers, including circulation of solicitations to minority and female contractor association and other business associations.

B. the firm will insure that the above policies for utilizing minority group subcontractors, suppliers and vendors are included in any agreements/contracts for subcontracted work.

VII. Records and Reports
A. The firm will keep such records as are necessary to determine compliance with its equal employment opportunity obligations. The records kept by the firm will be designed to indicate :

1. The number of minority, non-minority and female group member employees in each work classification.

2. The progress and efforts being made (in cooperation with unions, of appropriate) to increase protected group
employment opportunities.

3. The progress and efforts being made in locating , hiring, training, qualifying and upgrading protected group employees.

4. The progress and efforts being made in securing the services of minority group subcontractors.

B. All such records will be retained for a period of three years following completion of the contract work an shall be available at reasonable times and 170

Page 310 of 510 ends

10/00 EEA-9
places for inspection by authorized representatives of the States and Federal governments . The firm reserves the right to require these representatives to show proper credentials.

C. the firm will submit all reports required by Executive Order 11246 and appropriate state and federal agencies, and will permit access to its books, records, and accounts by the appropriate governmental agencies and the Secretary of Labor for purposes of investigation to ascertain compliance with the rules, regulations and orders of the Secretary of Labor promulgated pursuant to Executive Order 11246.

VIII. Other Work: The firm agrees that it will be bound by the Equal Opportunity Clause required by Executive Order 11246 with respect to its own employment practices when it direct federal contract.

IX. Assistance in Compliance: The firm agrees it will assist and cooperate actively with the appropriate governmental agencies and the Secretary of Labor in obtaining the compliance of contractors and subcontractors with the Equal Opportunity Clause and the rules, regulations, and relevant orders of the Secretary of Labor. The firm will furnish such information as may be required for the supervision of such compliance.

X. Non-Segregated Facilities: All employee facilities provided by the firm shall be non-segregated . These include, but are not limited to, rest areas, parking lots, drinking fountains, and all other such common facilities. Toilets and necessary changing facilities will offer privacy to both males and females .

XI. Post Award Compliance: It is understood that the OFCCP may review the firm's employment practices as well as those of any subcontractors the company has employed during the performance of a federally-assisted or direct federal contract. If the goals for the employment of minorities and females set by the OFCCP are not being met, the firm shall still be given an opportunity to demonstrate that is has made every good faith effort to meet itscommitment.

For the purpose of this policy statement, a bona fide Minority Business Enterprise is a business, firm, or corporation which is at least fifty one percent (51%) owned and operated by a minority person or persons.

The purpose of the firm's commitment to specific goals for the utilization of minority and/or female employees is to meet the affirmative action obligations under the equal Opportunity clause of a federal or federally-assisted contract. This commitment is not intended and shall not be used to discriminate against any qualified applicant or employee.

XII. Refusal to Deal with Debarred or Ineligible Contractors or Subcontractors:

The firm agrees that it will refrain from entering into any contract or 171

Page 311 of 510 ends

10/00 EEA-10
contract modifications subject to Executive Order 11246 with a contractor or subcontractor debarred from or who has not demonstrated eligibility for direct federal or federally-assisted construction contracts pursuant to Executive Order 11246.
will use its best effort to meet the goals set forthin
Name of Firm
the contract specifications.

Complaints of non-compliance and grievances are to be directed to the attention of the firm's designated Equal Opportunity Officer:

Name
Firm
StreetAddress
City, State, Zip
Telephone Number with Area Code
Name and Title of Person Signing Plan
Firm Name
Date
172

Page 312 of 510 ends

FEDERAL PREVAILING WAGE PAYMENT INFORMATION
All prime contractors and subcontractors are required to pay the higher if either the rates published in the Davis-Bacon Wage Determination issued by the U.S. Department of Labor (Federal) or the General Prevailing Wage Determination issued by the California Department of Industrial Relations (Date) to all laborers and mechanics and other workers on the project. The State wages can be obtained by contacting the Department of Industrial Relations, on-line at Director's General Prevailing Wage Determinations (ca.gov) or by contacting the Kern County Planning and Natural Resources Department – Community Development Division at (661) 862- 5050.

The latest modification of the Federal wages can be obtained on-line at SAM.gov | Search and completed, from the drop down menus, the appropriate State information (“California”), County information (“Kern”), type off project construction (“Building”, “Heavy”, “Highway”, or “Residential”), and WD [Wage Decision} Number (“CA20”). Then click on the “Search” Button.

You will need to remember that the federal wage “locks” on a certain stage of the procurement process so the latest modification available on-line may not apply to this specific project. If you go on-line to obtain Federal wages, please check with the Kern County Planning and Natural Resources Department – Community Development Division to see if you have the applicable wage decision for this specific project.

Immediately following is a copy of the project Davis Bacon Wage Determination (General Decision), which is the listing of the Federal wages. Unless modified prior to bid opening, this wage decision will apply to the project.

All contractors agree to comply with the latest applicable Davis-Bacon Wage Determination, as determined solely by County, regardless of what Davis Bacon Wage Determination is actually contained in the specifications. The successful contractor will be notified no later than the project preconstruction conference if the applicable wage decision is different than the one contained in this specification, or in any addendums issued prior to bid opening. All prospective contractors and subcontractors on this project should verify this Davis-Bacon Wage Determination contains an area labor classification and specified wage rate for each of the different trades that the contractor/subcontractor intends to use on this project. If a proper area classification and wage rate cannot be found for a trade that you, as prime contractor or subcontractor, intend to use on this project, please immediately contact the Kern County Planning and Natural Resources Department – Community Development Division (PLNR) at (661) 862-5050. PLNR will, on your behalf, contact the U.S Department of Housing and Urban Development (HUD) and the U.S. Department of Labor to ascertain what the proper federal area classification and wage rate is for any trades in question. 173

Page 313 of 510 ends

SUPPLEMENTAL INFORMATION

REGARDING

PREVAILING WAGE
AND

STATE AND FEDERAL LABOR

STANDARDS

REQUIREMENTS
This section provides additional guidance to all contractors and subcontractors bidding or working on this project. It is placed into these specifications so that you will be made aware of those items where discrepancies have occurred in the past. However, please also be aware that this section is not all inclusive, nor is it meant to emphasize the special importance of any particular requirement. The topics covered in this supplement include prevailing wage requirements for Truck Drivers on HUD funded projects, bid submittal requirements for Trucking Services and labor standards compliance requirements for “working subcontractors”.

ALL CONTRACTORS ARE URGED TO CAREFULLY REVIEW THIS INFORMATION BEFORE BIDDING OR WORKING IN THIS PROJECT. If there are any questions regarding these matters, please contact the Kern County Community and Economic Development Department.
174

Page 314 of 510 ends

Prevailing wage payment requirements for Truck Drivers
AND for Self Employed Laborers and Mechanics
(“Working Subcontractors”) on HUD funded projects
February 6, 2002

1. The current State and Federal requirements regarding prevailing/Davis-Bacon wage payments to Truck Drivers on public works projects are as follows:

State of California Requirements:

Truck drivers hauling materials to or from a public works jobsite are subject to prevailing wages. The State of California Department of Industrial Relations, in their Coverage Letters PW#99-066 and PW#99-081, indicate that truck drivers are “workers employed by contractors or subcontractors in the execution of any contract for public work” and therefore “are deemed to be employed upon public work” and required to be paid prevailing wages. However, and at this time, it appears that this requirement does not apply to Truck Drivers who are merely dropping off materials from a commercial supplier.

Federal Requirements:

Under regulations that went into effect on January 19, 2001, (65 FR 80268, dated December 20, 2000) Truck Drivers employed by a construction contractor or subcontractor transporting materials to or from the site of work are covered by Davis-Bacon for the time spent on site that is more than “de minimis”, or more than the time it takes to pick up or drop off materials. For example, material delivery truck drivers who come on to the site of work for only a few minutes at a time merely to drop off construction materials are not covered by Davis-Bacon. All other truck drivers on the “site of work” are covered by Davis-Bacon. “Site of Work” is defined in the regulations as:
a.) The physical place or places where the building or work called for in the contract will remain; and any other site where a significant portion of the building or work is constructed, provided that such site is established specifically for the performance of the contract or project;
b) Except as provided in paragraph ‘c’ below, job headquarters, tool yards, batch plants, borrow pits, etc., are part of the site of work provided they are dedicated exclusively, or nearly so, to performance of the contract or project, and provided they are adjacent or virtually adjacent the site of work as defined in paragraph ‘a’ above; c) Not included in the site of work are permanent home offices, branch plant establishments, fabrication plants, tool yards, etc., of a contractor or subcontractor whose location and continuance in operation are determined wholly without regard to a particular Federal or federally assisted contract or project. In addition, borrow pits, job headquarters, tool yards, etc., of a commercial or material supplier, which are 175

Page 315 of 510 ends

established by a supplier of materials for the project before the opening of bids and not on the site of the work as stated in paragraph ‘a’ above, are not included in the site of work. Such permanent, previously established facilities are not part of the site of work, even where the operations for a period of time may be dedicated exclusively, or nearly so, to the performance of a contract.

Contractors are notified that they should follow
the more restrictive requirement noted above.

Other requirements of HUD also indicate that Truck Drivers who are working on the site of work, as defined above, and who are “Owner-Operators” must be reported on project payrolls that are prepared by the firm who hired them. These payrolls, which must be signed by both the owner-operator and by the contractor or broker who hired them, must also include the hourly wage rates paid to these owner - operators as well as the hours they worked on the project. Any individuals, including other Truck Drivers, who are working on the site of work (as defined above) and are employed by an OwnerOperator, are covered by Davis-Bacon. But also be aware: per State requirements, all Truck Drivers employed by contractors and subcontractors in the execution of any contract for public work (and who are not merely dropping off materials from a commercial supplier) are covered by State prevailing wage requirements.

Bid Submittal Requirements of Trucking Services:

Based on legal advice provided to the CD Program Department, the names of trucking firms who will be working on the project for the prime contractor (not a material supplier) must appear on the prime contractor’s List of Subcontractors as follows:

If the trucking services are provided by a firm using its own employees and who is getting paid an amount in excess of ½ of 1% of the prime contractor’s bid, they must be listed as a subcontractor.

If trucking services are to be provided solely by Owner-Operator Truck Drivers hired directly by the prime contractor, or through a brokerage arrangement, the Owner-Operator Truck Driver payroll information must be provided by the firm for whom services are being rendered, but these Owner-Operator Truck Drivers do not need to be listed as a subcontractor on the List of Subcontractors.

2. Per HUD Labor Relations Letter No. LR-96-01, the current requirements for payment of prevailing wages to self employed laborers and mechanics (a.k.a. “working subcontractors”) are as follows:

The payment of prevailing wage rates established by HUD provide that the wage protections afforded apply to laborers and mechanics employed on federally-assisted construction contracts regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. Additionally, all 176

Page 316 of 510 ends

laborers and mechanics must be paid unconditionally and not less often than once per week. There is no exception to this protection for self-employed laborers or mechanics, including owners of businesses, sole-proprietors, partners, corporate officers, or others.
“Laborers and mechanics” may not certify to the payment of their own prevailing wages EXCEPT where the laborer or mechanic is the owner of a business working on the site of the work with his/her own crew.

Payrolls submitted reporting single or multiple owners certifying that they have paid to themselves the prevailing wage for their craft are unacceptable; rather, such laborers or mechanics must instead be carried on the certified payroll of the contractor or subcontractor (the “responsible employer”) for whom they are working and with whom they have executed a contract.

Whatever method of compensation computation is utilized, the amount of weekly compensation divided by the actual hours of work performed for that week must result in an “effective” hourly wage rate for that week that is not less than the prevailing hourly rate for the type of work involved. The name, work classification, actual hours of work, effective hourly wage rate, and wage payment of each self-employed laborer and mechanic must be reported and certified on the responsible employer’s weekly payroll.

More extensive guidance for the Federal prevailing wage requirements and compliance standards for self-employed laborers and mechanics (also referred to as “working subcontractors”) is detailed in HUD Labor Relations Letter No. LR-96-01, dated December 2, 1996 (copy attached). Additional information is also provided regarded HUD’s compliance and certification parameters for owner-operators of power equipment and truck drivers.
177

Page 317 of 510 ends

178

Page 318 of 510 ends

179

Page 319 of 510 ends

180

Page 320 of 510 ends

181

Page 321 of 510 ends

182

Page 322 of 510 ends

183

Page 323 of 510 ends

184

Page 324 of 510 ends

185

Page 325 of 510 ends

186

Page 326 of 510 ends

187

Page 327 of 510 ends

188

Page 328 of 510 ends

189

Page 329 of 510 ends

190

Page 330 of 510 ends

191

Page 331 of 510 ends

192

Page 332 of 510 ends

193

Page 333 of 510 ends

194

Page 334 of 510 ends

195

Page 335 of 510 ends

196

Page 336 of 510 ends

197

Page 337 of 510 ends

198

Page 338 of 510 ends

199

Page 339 of 510 ends

200

Page 340 of 510 ends

201

Page 341 of 510 ends

202

Page 342 of 510 ends

203

Page 343 of 510 ends

204

Page 344 of 510 ends

205

Page 345 of 510 ends

206

Page 346 of 510 ends

207

Page 347 of 510 ends

208

Page 348 of 510 ends

209

Page 349 of 510 ends

COUNTY OF KERN

PLANNING AND NATURAL RESOURCES DEPARTMENT

SMALL BUSINESS AFFIRMATIVE ACTION PLAN
PURPOSE: This Plan contains policies, procedures, and contract clauses applicable to the objective of facilitating maximum practicable opportunity for participation of small businesses (SBs) in Community Development Block Grant (CDBG) funded contracts at both the prime and subcontract level. This Plan is designed to carry out the procurement standards found at 24 CFR 85.36(e).

GENERAL APPROACH : The Kern County Planning and Natural Resources Department (PLNR) is charged with facilitating the participation of small businesses in CDBG funded contracts and will administer an affirmative action plan which, at a minimum, shall provide for the following:

I. Seek out small businesses and facilitate the placement of such concerns on the County's SB source list;
II. Solicit offers from the small businesses on the County's SB source list; Ill. Counsel small businesses, with respect to business opportunities, for the purpose of enhancing their potential participation in CDBG funded contracts; IV. Ensure small businesses will have an equitable opportunity to compete for contracts, particularly by arranging solicitations, time for the preparation of bids, quantities, specifications, and delivery schedules, to facilitate as practicable, the participation of small businesses; V. Establish operating procedures which accomplish these general requirements; VI. Maintain records showing small businesses on the County's SB source list, and dollar value of awards to such concerns;
VII. Obtain data on subcontract awards to small businesses from prime contractors which have the "Small Business Subcontracting Program" clause (Exhibit "B") in their contracts; VIII. Submit reports at such times, and in such form, as established by the U. S. Department of Housing and Urban Development (HUD);
IX. Provide that the policies and procedures established in this Plan shall also apply to those firms certified as WOMAN BUSINESS ENTERPRISES (WBEs);
X. Establish a method for referral of any written discrimination complaints received by the County to HUD's Fair Housing or Equal Opportunity Office; and
XI. Establish an appeal procedure to the Director of the PLNR for contractors or apparent low bidders who the SB Liaison Officer determines have not taken the necessary affirmative steps to comply with this Plan or meet SB participation objectives. The decision, on appeal, of the PLNR Director shall be final.

RESPONSIBI LITY: The Small Business Liaison Officer for the PLNR and its CDBG funded projects will be the Business Manager, (661) 862-5050, for said Program. Those tasks generally described in the General Approach section of this Plan are the responsibilities of the SB Liaison 210

Page 350 of 510 ends

Officer. The Business Manager/SB Liaison Officer will be assigned such staff as is necessary to implement the provisions of this Plan and shall report to the PLNR Director.

PROCEDURE:

I. APPLICATION - The Plan set forth herein shall apply to contracts for goods, services, and construction involving CDBG funding of more than the simplified acquisition threshold fixed at 41 U.S.C. 403 (11) (currently set at $250,000).

II. DEFINITIONS
A. Small Business or SB: A business, including its affiliates, that is independently owned and operated, not dominant in its field of operation in which it is bidding for government contracts, and qualified as a small business under the criteria in 13 CFR part 121. The size criterion entitled "Small Business Size Standards" has been attached to this Plan as Exhibit "C" and is incorporated herein as if set forth in full.

B. Contract: An agreement for goods, services, and construction, between the County of Kern or its subgrantees and a bidder, involving more than $250,000 in CDBG funds.

C. Contractor: The individual, partnership, corporation, joint venture or other legal entity entering into a contract with the County of Kern or its subgrantees.

D. Subcontractor: Any person, firm, association, or corporation entering into a subcontract with a contractor or higher-tier subcontractor.

E. HUD: United States Department of Housing and Urban Development.

F. Woman Business Enterprise or WBE: A business, at least 50 percent of which is owned by women; or in the case of publicly owned businesses, at least 51 percent of the stock of which is owned by women.

Ill. Specific Duties of SB Liaison Officer
A. Policy - The SB Liaison Officer with direction from the PLNR Director will establish policy for the administration of this Plan. At a minimum such policy shall require the County or its designee to:

1. Utilize small businesses on all contracts for construction involving CDBG funding of more than the simplified acquisition threshold, fixed at 41 U.S.C. 403 (11) (currently set at $250,000), to the maximum extent feasible.

2. Require contractors bidding on a CDBG funded project to:
a. Abide by the provisions of this Plan as contained in the "Small Business Participation Requirements " and "Small Business Subcontracting Program" contract clauses attached hereto as Exhibits "A" and "B", respectively and incorporated herein as if set forth in full.
b. Make the maximum attempt feasible to achieve the County's objective for SB participation in CDBG funded contracts.

3. Examine contractor's SB affirmative action efforts in view of:
211

Page 351 of 510 ends

a. Opportunities for SBs as subcontractors.
b. Small business population of Kern County.
c. Any existing SB programs being utilized in Kern County by State, Federal or other local jurisdictions.
d. Availabilityof certified SB firms.
e. Past experience with SB contracting on similar projects.

4. Actively promote the SB Affirmative Action Plan by:
a. Publishing notice of the PLNR SB Plan as adopted by the County in small business and other local media; informing the public that comments for informational purposes only will be accepted by the County for 45 days from the date ofnotice. b. Maintaining a SBDirectory;

1. Consisting of SB name, address, telephone number, ethnicity and gender data, ownership, type of work performed, including NAICS code, and State contractor's license number.

2. Compiled from the SB Liaison Officer's solicitation of SBs for inclusion on said Directory, from the list of SBs certified by the California Department of Transportation, and from any SB Directories produced by local Small Business Development Centers.

3. With the small business status of each listed SB certified via use of "Small Business and Woman Business Enterprise Questionnaire" (SBQSTN) attached hereto as Exhibit "D" and incorporated herein by this reference as if set forth in full.
c. Providing interested parties with access to the current SB Directory, including contracting firms doing regular business with the County, project engineers,SB firms, and small business assistance agencies and service organizations. d. Transmitting notices inviting project bids/proposals to certified SBs and agencies servicing small businesses.
e. Ensuring all project bid solicitations (Notices to Contractors) appearing in news media clearly stipulate to the County's objective of maximum practical opportunity for participation of SBs in CDBG funded contracts.
f. Providing technical assistance to SBs including, but not limited to, the areas of CDBG contracts administration, bonding, assembling bid proposal packets, and introduction to contractors seeking SBs for project work.
g. Advising all County departments, Cooperation Cities, and other entities implementing CDBG funded projects of this Plan and the requirement for compliance with its provisions.

5. Advertise for small subcontractors, via a "Notice to Subcontractors", on behalf of the potential project prime contractors/bidders.
212

Page 352 of 510 ends

B. Contract Administration - The SB Liaison Officer will promote this Plan by requiring project contractors to comply with the "Small Business Participation Requirements" contract clause, attached hereto as Exhibit "A", contained in bid specifications or request for proposal packages and further described and explained at pre-bid or preproposal conferences.

C. Contract Compliance - To document compliance with this Plan the SB Liaison Officer shall:

1. Develop such reporting and documentation systems as are required pursuant to CDBG regulation to report on the activities and results of this Plan.

2. Monitor SB compliance during the course of contract completion.

3. Require bidding contractors to submit documentation verifying attainment of SB objectives/goals with their bid on Form SB-241, "Small Business and Woman Business Enterprise Utilization Bid Submission to the County of Kern", attached hereto as part of the bid submission forms and incorporated herein by this reference as if set forth in full. If the objectives/goals are not achieved, submission of documentation showing the necessary affirmative steps taken, as outlined in the "Small Business Participation Requirements" contract clause attached hereto as Exhibit "A", shall be required. Contractors may document their efforts on Form SB-242, "List of Necessary Affirmative Steps Taken To Involve Small Businesses (SBs)", attached hereto as part of the bid submission forms and incorporated herein by this reference as if set forth in full. 213

Page 353 of 510 ends

SMALL BUSINESS PARTICIPATION REQUIREMENTS
(Applies only to projects where CDBG funding is more than $250,000 and less than $750,000) I. It is the policy of the HUD that small businesses and women business enterprises shall have the maximum practicable opportunity to participate in the performance of HUD funded contracts.

II. The Contractor agrees to use his best efforts to carry out this policy in the award of his subcontracts to the fullest extent consistent with the efficient performance of this contract. Contractors may rely on written representations by subcontractors regarding their status as small businesses in lieu of an independent investigation.

Ill. A Small Business (SB) is a business, including its affiliates, which is independently owned and operated, not dominant in its field of operation in which it is bidding for government contracts, and qualified as a small business under the criteria in 13 CFR part 121. The size criterion entitled "Small Business Size Standards" is within this bid specification or request for proposal package for reference.

IV. Bidding Contractors shall make the maximum attempt feasible to achieve the County's objective for SB participation in CDBG funded contracts by performing the contract administration and compliance steps as follows:

A. Contract Administration: The contractor shall insert this clause in any subcontract involving CDBG funding of more than the simplified acquisition threshold, fixed at 41 U.S C. 403 (11) (currently set at $250,000), monitor the subcontractor's compliance, and maintain records of such compliance.

B. Contract Compliance: The Contractor shall evidence his/her understanding of and intent to comply with the County's PLNR SB Plan by submitting, as an integral part of his/her bid, the following:

1. To verify attainment of County's SB goals submit, with bid, Form SB-241 "SMALL BUSINESS

AND WOMAN BUSINESS ENTERPRISE UTILIZATION BID SUBMISSION TO THE COUNTY OF KERN"; and

2. When non-attainment occurs, submit, with bid, Form SB-242, "LIST OF NECESSARY AFFIRMATIVE STEPS TAKEN TO INVOLVE SMALL BUSINESSES (SBs)", including any additional documentation which provides evidence of the contractor's efforts to attain the County's SB goals, which is to include the following:
a. Statement of contractor's efforts to enter into direct contact withSBs. b. Report of responses received from SBs, including proposals or bids and the contractor's response thereto.
c. Copies of correspondence sent to groups and individual SBs as notification of the contractor's intent to contract with SBs.
d. Report of specific contacts with small contractor's associations, small business development centers, or any other agency which may disseminate bid information to SBs. e. Description of specific efforts undertaken by prime contractors to encourage subcontractors to obtain SB participation.

The bid forms section within this bid specification or request for proposal package includes both SB Forms. Bidders are hereby notified that in the event they do not meet the County's SB goal, their firm can still receive a CDBG funded contract if they performed all of the listed steps.

V. Bidders are hereby notified that the text of the entire SB Plan is available at PLNR upon request. 214

Page 354 of 510 ends

SMALL BUSINESS SUBCONTRACTING PROGRAM
(Applies only to projects where CDBG funding is more than $750,000) I. The Contractor agrees to establish and conduct a program which will enable small businesses to be considered fairly as subcontractors under this contract. The term "small business", as used in this clause, is defined at Ill. of the "Small Business Participation Requirements" contract clause. In this connection, the Contractor shall:

A. Designate a liaison officer who will administer the Contractor's Small Business Subcontracting Program.

B. Provide adequate and timely consideration of the potentialities of known small businesses in all "make-or-buy" decisions.

C. Assure small businesses will have an equitable opportunity to compete for subcontracts, particularly by arranging solicitations, time for the preparation of bids, quantities, specifications, and delivery schedules so as to facilitate the participation of small businesses.

D. Submit periodic reports of subcontracting to small businesses with respect to the records referred to in subparagraph (5), in such form and manner and at such time (not more often than quarterly) as PLNR's SB Liaison Officer may prescribe.

E. Maintain records showing (i) procedures adopted to comply with the policies set forth in this clause, including the establishment of a source list of small businesses, (ii) awards to small businesses on the source list, and (iii) specific efforts to identify and award contracts to small businesses.

F. Cooperate with PLNR's SB Liaison Officer in any studies and surveys; he/she may conduct, regarding small business procedures and practices of prime contractors.

II. The Contractor further agrees to insert, in any subcontract hereunder which may exceed $750,000, provisions which shall conform substantially to the language of this clause, including this paragraph II, and to notify the SB Liaison Officer of the names of such subcontractors. 215

Page 355 of 510 ends

SMALL BUSINESS SIZE STANDARDS
(November 2023)
13 CFR 121.201 is incorporated herein as if set forth in full. The size standards for industries deemed applicable by PLNR have been excerpted and are listed below by North American Industry Classification System (NAICS) codes.

The size standards are expressed either in number of employees or annual receipts in millions of dollars, unless otherwise specified. The number of employees or annual receipts indicates the maximum allowed for a business and its affiliates to be considered small.

NAICS
codes NAICS U.S. industry title
Size
standards
in millions
of dollars
Size
standards
in number
of
employees
Sector 23—Construction
Subsector 236—Construction of Buildings
236115 New Single-family Housing Construction (Except For-Sale Builders)
$45.0
236116 New Multifamily Housing Construction (except For-Sale Builders)
$45.0
236117 New Housing For-Sale Builders $45.0
236118 Residential Remodelers $45.0
236210 Industrial Building Construction $45.0
236220 Commercial and Institutional Building Construction $45.0 Subsector 237—Heavy and Civil Engineering Construction
237110 Water and Sewer Line and Related Structures Construction $45.0 237120 Oil and Gas Pipeline and Related Structures Construction $45.0 237130 Power and Communication Line and Related Structures Construction
$45.0
237210 Land Subdivision $34.0
237310 Highway, Street, and Bridge Construction $45.0
237990 Other Heavy and Civil Engineering Construction $45.0 Except, Dredging and Surface Cleanup Activities2 $37.02 Subsector 238—Specialty Trade Contractors
238110 Poured Concrete Foundation and Structure Contractors $19.0 238120 Structural Steel and Precast Concrete Contractors $19.0 238130 Framing Contractors $19.0
216

Page 356 of 510 ends

238140 Masonry Contractors $19.0
238150 Glass and Glazing Contractors $19.0
238160 Roofing Contractors $19.0
238170 Siding Contractors $19.0
238190 Other Foundation, Structure, and Building Exterior Contractors
$19.0
238210 Electrical Contractors and Other Wiring Installation Contractors
$19.0
238220 Plumbing, Heating, and Air-Conditioning Contractors $19.0 238290 Other Building Equipment Contractors $22.0
238310 Drywall and Insulation Contractors $19.0
238320 Painting and Wall Covering Contractors $19.0
238330 Flooring Contractors $19.0
238340 Tile and Terrazzo Contractors $19.0
238350 Finish Carpentry Contractors $19.0
238390 Other Building Finishing Contractors $19.0
238910 Site Preparation Contractors $19.0
238990 All Other Specialty Trade Contractors $19.0
Except, Building and Property Specialty Trade Services13 $19.013 Sector 54—Professional, Scientific and Technical Services Subsector 541—Professional, Scientific and Technical Services 541110 Offices of Lawyers $15.5
541191 Title Abstract and Settlement Offices $19.5
541199 All Other Legal Services $20.5
541211 Offices of Certified Public Accountants $26.5
541213 Tax Preparation Services $25.0
541214 Payroll Services $39.05
541219 Other Accounting Services $25.0
541310 Architectural Services $12.5
541320 Landscape Architectural Services $9.0
541330 Engineering Services $25.5
Except, Military and Aerospace Equipment and Military Weapons $47.0 Except, Contracts and Subcontracts for Engineering Services Awarded Under the National Energy Policy Act of 1992
$47.0
217

Page 357 of 510 ends

Except, Marine Engineering and Naval Architecture $47.0 541340 Drafting Services $9.0
541350 Building Inspection Services $11.5
541360 Geophysical Surveying and Mapping Services $28.5 541370 Surveying and Mapping (except Geophysical) Services $19.0 541380 Testing Laboratories $19.0
541410 Interior Design Services $9.0
541420 Industrial Design Services $17.0
541430 Graphic Design Services $9.0
541490 Other Specialized Design Services $13.5
541511 Custom Computer Programming Services $34.0
541512 Computer Systems Design Services $34.0
541513 Computer Facilities Management Services $37.0
541519 Other Computer Related Services $34.0
Except, Information Technology Value Added Resellers18 15018 541611 Administrative Management and General
Management Consulting Services
$24.5
541612 Human Resources Consulting Services $29.0
541613 Marketing Consulting Services $19.0
541614 Process, Physical Distribution and Logistics
Consulting Services
$20.0
541618 Other Management Consulting Services $19.0
541620 Environmental Consulting Services $19.0
541690 Other Scientific and Technical Consulting Services $19.0 541713 Research and Technology in Nanotechnology11
541714 Research and Development in Biotechnology11
(except Nanotechnology)
1,00011
541715 Research and Development in the Physical,
Engineering, and Life Sciences (except Nanotechnology
and Biotechnology)11
1,00011
Except, Aircraft, Aircraft Engine, and Engine Parts11 111,500 Except, Other Aircraft Parts and Auxiliary Equipment11 111,250 Except, Guided Missiles and Space Vehicles, Their Propulsion Units and Propulsion Parts11
111,300
218

Page 358 of 510 ends

541720 Research and Development in the Social Sciences
and Humanities
$28.0
541810 Advertising Agencies10 $25.510
541820 Public Relations Agencies $19.0
541830 Media Buying Agencies $32.5
541840 Media Representatives $21.0
541850 Outdoor Advertising $34.5
541860 Direct Mail Advertising $22.0
541870 Advertising Material Distribution Services $28.5 541890 Other Services Related to Advertising $19.0
541910 Marketing Research and Public Opinion Polling $22.5 541921 Photography Studios, Portrait $16.0
541922 Commercial Photography $9.0
541930 Translation and Interpretation Services $22.5
541940 Veterinary Services $10.0
541990 All Other Professional, Scientific and Technical Services $19.5 219

Page 359 of 510 ends

Footnotes:

2. NAICS code 237990—Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.

10. NAICS codes 488510 (excluding the exception) 531210, 541810, 561510, 561520, and 561920—As measured by total revenues, but excluding funds received in trust for an unaffiliated third party, such as bookings or sales subject to commissions. The commissions received are included as revenues.

11. NAICS code 541713, 571714 and 541715—
(a) “Research and Development” means laboratory or other physical research and development. It does not include economic, educational, engineering, operations, systems, or other nonphysical research; or computer programming, data processing, commercial and/or medical laboratory testing.
(b) For research and development contracts requiring the delivery of amanufactured product, the appropriate size standard is that of the manufacturing industry. (c) For purposes of the Small Business Innovation Research (SBIR) program only, a different definition has been established by law. See §121.701 of these regulations. (d) “Research and Development” for guided missiles and space vehicles includes evaluations and simulation, and other services requiring thorough knowledge of complete missiles and spacecraft.

13. NAICS code 238990—Building and Property Specialty Trade Services: If a procurement requires the use of multiple specialty trade contractors (i.e., plumbing, painting, plastering, carpentry, etc.), and no specialty trade accounts for 50% or more of the value of the 220

Page 360 of 510 ends

procurement, all such specialty trade contractors activities are considered a single activity and classified as Building and Property Specialty Trade Services.

1. 18. NAICS code 541519—An Information Technology Value Added Reseller (ITVAR) provides a totalsolution to informationtechnology acquisitionsby providingmulti-vendor hardware and software along with significant value added services. Significant value added services consist of, but are not limited to, configuration consulting and design, systems integration, installation of multi-vendor computer equipment, customization of hardware or software, training, product technical support, maintenance, and end user support. For purposes of Government procurement, an information technology procurement classified under this exception and 150-employee size standard must consist of at least 15% and not more than 50% of value added services, as measured by the total contract price. In addition, the offeror must comply with the manufacturing performance requirements, or comply with the non-manufacturer rule by supplying the products of small business concerns, unless SBA has issued a class or contract specific waiver of the non-manufacturer rule. If the contract consists of less than 15% of value added services, then it must be classified under a NAICS manufacturing industry. If the contract consists of more than 50% of value added services, then it must be classified under the NAICS industry that best describes the predominate service of the procurement. 221

Page 361 of 510 ends

G:\Shafter City of- 3846\384625001-CDBG Bid Package\200 Technical\290 Specifications\Shafter Library\D. 7.d.IV Small Business and WBE Questionnaire.doc

COUNTY OF KERN

PLANNING AND NATURAL RESOURCES DEPARTMENT

SMALL BUSINESS AND WOMAN BUSINESS ENTERPRISE QUESTIONNAIRE

1. Name of Firm

2. Business Address City State Zip

3. Name of Person to Contact Telephone No.
(list only one) (list only one)

4. A. Type of Ownership CHECK ONE ONLY
___ Sole Ownership ___ Partnership ___ Joint Venture ___ Other ___ Corporation B. Ownership Status CHECK ALL THAT APPLY
___ Woman ___ Non-Woman ___ Minority Owned - OWNERSHIP MUST BE 51% OR MORE

5. Contractor's License Nos.

A. License Class_____ No.________ Expiration Date_________ B. License Class_____ No.________ Expiration Date_________ Name of License Name of License
Qualifying Individual________________________________ Qualifying Individual________________________________

6. Nature of Firm's Business:

NAICS Code Years in Business
Does the Business meet the applicable size standard of a ‘Small Business’ as indicated on the COUNTY OF

KERN PLANNING AND NATURAL RESOURCES DEPARTMENT SMALL BUSINESS AFFIRMATIVE ACTION PLAN’s Exhibit "C" entitled "Small Business Size Standards"? [ ] Yes [ ] No

7. Identify all individuals who own 5% or more of this firm. (Also, please list on another sheet, the contributions of money, equipment, real estate, or expertise of each of the owners, if any) Years % %
Name: Sex Owned Owned Voting
[ ] Black [ ] Asian/Pacific Islander [ ] Hispanic**
[ ] Amer. Indian/Alaskan Native [ ] Hasidic Jew [ ] White Name:
[ ] Black [ ] Asian/Pacific Islander [ ] Hispanic**
[ ] Amer. Indian/Alaskan Native [ ] Hasidic Jew [ ] White Name:
[ ] Black [ ] Asian/Pacific Islander [ ] Hispanic **
[ ] Amer. Indian/Alaskan Native [ ] Hasidic Jew [ ] White **Person of Spanish culture with origins in Mexico, South/Central America or Caribbean Islands, regardless of race, are considered to be Hispanic as defined in the Equal Opportunity Regulations. 222

Page 362 of 510 ends

G:\Shafter City of- 3846\384625001-CDBG Bid Package\200 Technical\290 Specifications\Shafter Library\D. 7.d.IV Small Business and WBE Questionnaire.doc

8. Are you authorized to do business in California as well as locally, including all necessary business licenses? [ ] YES [ ] NO

9. Is your firm registered as a small business with:

State of California, Department of General Services, Office of Small Business Certification and Resources [ ] YES [ ] NO A Federal Agency Office of Small Disadvantaged Business Utilization [ ] YES [ ] NO

10. Indicate if this firm or other firms with any of the same officers have previously received or been denied certification or participation as a SB and describe the circumstances. Indicate the name of the certifying authority and the date of such certification or denial.

VERIFICATION
"The undersigned swears that the foregoing statements are true and correct and include all material information necessary to identify and explain the operations of (name or firm) as well as the ownership thereof. Further, the undersigned agrees to provide through the prime contractor or, if no prime, directly to the County of Kern Planning and Natural Resources Department current, complete and accurate information regarding actual work performed on the project, the payment thereof and any proposed changes, if any, of the foregoing arrangements and to permit the audit and examination of books, records, and files of the named firm.

Any material misrepresentation will be grounds for terminating any contract which may be awarded and for initiating action under federal or state laws concerning false statements." NOTE: If, after filing this schedule, and before the work on any contract covered by this regulation, there is any significant change in the information submitted, you must inform the County of the change, either through the prime contractor or to the County directly.

Date Contractor/Subcontractor
Signature
Title
223

Page 363 of 510 ends

224

Page 364 of 510 ends

225

Page 365 of 510 ends

226

Page 366 of 510 ends

227

Page 367 of 510 ends

228

Page 368 of 510 ends

229

Page 369 of 510 ends

230

Page 370 of 510 ends

231

Page 371 of 510 ends

232

Page 372 of 510 ends

233

Page 373 of 510 ends

234

Page 374 of 510 ends

235

Page 375 of 510 ends

236

Page 376 of 510 ends

237

Page 377 of 510 ends

238

Page 378 of 510 ends

239

Page 379 of 510 ends

240

Page 380 of 510 ends

241

Page 381 of 510 ends

Other Federal Requirements
Bid Award Registration
In order to be considered responsive, the project Prime Contractor must have an active entity registration with Sam.gov, or its successor website, and all subs, at a minimum, shall be issued a Unique Entity Identification (UEI) number from Sam.gov, or its successor website. Bids will be reviewed for federal exclusions with Sam.gov, or its successor/equivalent website(s), prior to award. Where active exclusions are found involving bidders, it may prevent the award of the project, even if the bid is otherwise considered the lowest, most responsive bid.

Build America, Buy America Act
(As Applicable, based on Grant Year Funding included in Project) In accordance with the Build America, Buy America Act (BABA), any project with a total cost of more than $250,000 and utilizing CDBG funds for Infrastructure Projects, as defined under 2 CFR 184.4(d), shall incorporate within the plans and specifications BABA requirements for all iron, steel, manufactured products, or construction materials utilized in the execution of the construction work performed. Any exception to this requirement, must either obtain a waiver or fall within the de minimis thresholds provided under HUD guidelines.

Federal Prevailing Wage Requirements
This Community Development Project is subject to the Davis Bacon Act, the Copeland "Anti-Kick Back" Act, the Equal Employment Opportunity Requirements and the Contract Works Hours and Safety Standards Act. Minimum wage rates as predetermined by the Secretary of Labor are set forth in the Special Provisions. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and his subcontractors shall pay not less than the higher wage rate. 242

Page 382 of 510 ends

EXHIBIT “C”

M A T E R I A L C O V E R E D A T P R O J E C T

P R E C O N S T R U C T I O N C O N F E R E N C E

PURPOSE
AGENDA
I. Contractor/Subcontractor Information Sheet Form CDA-100 II. Section 3 Compliance Instructions
III. Executive Order No. 11246, amended by Executive Order No. 11375, Equal Employment Opportunity
IV. Contractor's Ratio of Apprentices to Journeymen AND Proving Employee Apprentice Status
V. Project Wage Determination
VI. Fringe Benefit Statement
VII. U.S. Department of Labor Form WH-347, Weekly Payroll Sheet VIII. Working Subcontractors
IX. Record of Employee Interview, Form HUD 11
PRECONST_Revised_12_12_22
Revised 2022
243

Page 383 of 510 ends

Preconstruction Conference

Page 2 of 7 ends

EXHIBIT “C”

PRECONSTRUCTION CONFERENCE

PURPOSE
HUD requires that CDBG recipients hold a conference with the principal project contractor and all available subcontractors prior to the actual start of project construction. Seven days lead notice of conference date is required by HUD. The purpose of the Conference is to inform project contractors of their responsibilities relating to Equal Employment Opportunity, Federal Labor Standards, and general contract compliance.

AGENDA
I. Contractor/Subcontractor Information Sheet, Form CDA-100 A. Required for completion of County's Contract and Subcontract Activity Report to HUD.

B. This form is used to document whether the contractor/subcontractor is a:

1. Minority Contractor

2. Woman Contractor

3. Contractor whose contract was procured by Competitive Bidding C. Submission is required prior to issuance of "NOTICE TO PROCEED." D. Construction cannot start until proper review and approval by County.

II. Section 3 Compliance Instructions
A. The purpose of Section 3 is to ensure that employment and other economic opportunities generated by the HUD financial assistance on this project shall, to the greatest extent feasible, and consistent with existing federal, state and local laws and regulations, be directed to low - and very low - income persons, particularly those who are recipients of government assistance for housing or residents of the community in which the federal assistance is spent.

B. Under Part 75, Section 3 applies to those projects that receive HUD financial assistance exceeding $200,000, for all contracts and subcontracting opportunities. If this project exceeds that assisted threshold, it is subject to the Section 3 requirements.

Section 3 does not apply to material supply contracts.

C. Please consult the Section 3 Compliance Instructions contained in the project 244

Page 384 of 510 ends

Preconstruction Conference

Page 3 of 7 ends

EXHIBIT “C”
specification manual for more details regarding project Section 3 compliance.

III. Executive Order No. 11246, amended by Executive Order No. 11375, Equal Employment Opportunity.

A. The purpose of Executive Order No. 11246, as amended by Executive Order No. 11375, is to assure that project contractors and subcontractors will not discriminate against project employees in regard to their race, color, religion, sex or national origin.

B. For federally funded construction contracts in excess of $10,000, contractors and subcontractors are required to make a good faith effort to ensure that 19.1% of all work hours are performed by minority workers and that 6.9% of all work hours are performed by women.

C. Written Affirmative Action Plans are required for federally funded construction prime contracts of $1,000,000 or more and for subcontracts of $100,000 or more.

D. All contractors and subcontractors working on federally-assisted construction projects are required, by the U.S. Department of Labor, Employment Standards Administration, Office of Federal Contract Compliance Programs (OFFCP) to collect race and gender information on construction employees, classified by trade. This information must be maintained not only for this project, but for all work your firm is performing, whether it is federally funded or not. The U. S. Department of Labor reserves the right to review this information in the future.

E. HUD may impose sanctions such as contract suspension or termination and/or debarment in future federally funded construction projects in cases of noncompliance.

IV. Contractor's Ratio of Apprentices to Journeymen AND Proving Employee Apprentice Status
A. The purpose of the Contractor's Ratio of Apprentices to Journeymen is to comply with the California Labor Code regarding employment of apprentices on public works projects.

B. The contractor or subcontractor shall apply for a certificate from the local craft Joint Apprenticeship Council, approving the contractor's or subcontractor's participation in an apprenticeship program.

C. The ratio of apprentices to journeymen in any craft or trade employed on a public works project is to be no less than one apprentice to each five Journeymen. 245

Page 385 of 510 ends

Preconstruction Conference

Page 4 of 7 ends

EXHIBIT “C”
D. Noncompliance requires withholding of fifty dollars ($50.00) from progress payments for each day of noncompliance.

E. For each apprentice listed on project payrolls, the contractor or subcontractor shall submit with the first payroll the apprentice is listed on, current registration information from the U. S. Department of Labor - Office of Apprenticeship. Copies of Apprentice Agreements will no longer be accepted as proof of registration in an approved program. ALSO, each apprentice who is listed on project payrolls must have listed for them what type of apprentice (Electrical, Plumbing, Cement Mason, etc.) they are.

V. Project Wage Determination
A. The Wage Determination lists the minimum wages to be paid all non-supervisory employees.

B. Listed are the different Hourly Rates of Pay for all employees depending upon each employee's Labor Classification and Group Number.

C. All employees listed on any project payrolls are to be listed by their proper Labor Classification Title and Group Number as found in the project Wage Determination for the type of work they actually perform.

VI. Fringe Benefit Statement
A. The purpose of the “Fringe Benefit Statement” is to have the contractor/subcontractor provide additional information regarding fringe benefits paid into an “...approved plan, fund, or program.”
B. Listed are the hourly rates for the various categories of fringe benefits, and the name & address of the fund to which the fringe benefits are being paid into, for each labor classification being used on the job-site.

C. The information provided on this Statement is used to assist the project monitor in payroll reviews to verify that employees are receiving the required total wage package (the basic rate plus fringe benefit per hour).

D. The “Fringe Benefit Statement” is to be submitted by the prime contractor and each sub-contractor (who has not already indicated that fringe benefits are being paid in cash to the employee) with the first weekly Certified Payroll for work performed.

VII. U. S. Department of Labor Form WH-347, Weekly Payroll Sheet 246

Page 386 of 510 ends

Preconstruction Conference

Page 5 of 7 ends

EXHIBIT “C”
A. The purpose of Form WH-347, Weekly Payroll Sheet, is to verify that all project employees are being paid weekly and correctly. The use of any other payroll form will be acceptable only if its format includes all the information needed to meet HUD requirements. All payrolls submitted must be originals, with “wet signatures” on the Statements of Compliance.

B. The Weekly Payroll Sheet is to be submitted to the County/Owner/Architect or Engineer once a week, each week, that work was done on this project.

C. Weekly Payroll Computations will be checked for both mathematical accuracy and for any non-permissible deductions.

D. Untimely submittal or submittal with errors will require holding up of progress payments, until this form is received.

E. Prime Contractors and subcontractors must retain their basic payroll records (payroll register, individual earning cards, check stubs, etc.) for a three year period after completion of the project.

F. If requested, contractors shall make their Superintendent's log book available to the payroll reviewer for payroll compliance review purposes.

VIII. Working Subcontractors
A. The payment of prevailing wage rates established by HUD provide that the wage protections afforded apply to laborers and mechanics employed on federally-assisted construction contracts regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. Additionally, all laborers and mechanics must be paid unconditionally and not less often than once per week. There is no exception to this protection for self-employed laborers or mechanics, including owners of businesses, sole-proprietors, partners, corporate officers, or others.

B. “Laborers and mechanics” may not certify to the payment of their own prevailing wages EXCEPT where the laborer or mechanic is the owner of a business working on the site of the work with his/her own crew.

C. Payrolls submitted reporting singe or multiple owners certifying that they have paid to themselves the prevailing wage for their craft are unacceptable; rather, such laborers or mechanics must instead be carried on the certified payroll of the contractor or subcontractor (the “responsible employer”) for whom they are working and with whom 247

Page 387 of 510 ends

Preconstruction Conference

Page 6 of 7 ends

EXHIBIT “C”
they have executed a contract.

D. Whatever method of compensation computation is utilized, the amount of weekly compensation divided by the actual hours of work performed for that week must result in an “effective” hourly wage rate for that week that is not less than the prevailing hourly rate for the type of work involved. The name, work classification, actual hours of work, effective hourly wage rate, and wage payment of each self-employed laborer and mechanic must be reported and certified on the responsible employer’s weekly payroll.

E. More extensive guidance for the Federal prevailing wage requirements and compliance standards for self-employed laborers and mechanics (also referred to as “working subcontractors”) is detailed in Labor Relations Letter No. LR-96-01, dated December 2, 1996. Additional information is also provided regarded HUD’s compliance and certification parameters for owner-operators of power equipment and truck drivers.

IX. Record of Employee Interview, Form HUD-11
A. Interviews will be conducted by County/Owner/Architect or Engineer staff or their designee.

B. Required to document the confirmation that::

1. Project Employees are working in the correct classification; and

2. For the correct pay.

B. Random samples of each contractor/subcontractor(s) workforce will be interviewed throughout the course of the project.

D. Comparisons of interview forms with the Weekly Payroll Sheets and Prevailing Wage Decision will assure proper payment to project workforce.

E. Failure to resolve discrepancies within a reasonable period of time will cause future progress payments to be held up.

F. County/Owner/Architect or Engineer staff who administer the HUD-11 forms are hereby reminded that they are to indicate “None” in the Remarks sections of the form when there is nothing additional to report from the actual interview or the comparison of the HUD-11 form to the payroll and the project wage decision. The HUD-11 interviewer and payroll examiner are each to sign and date the form in the spaces provided when 248

Page 388 of 510 ends

Preconstruction Conference

Page 7 of 7 ends

EXHIBIT “C”
they have completed the interview and examination.
249

Page 389 of 510 ends

Rev. 0
August 20, 2010
City of Shafter Library and Learning Center, Chess Garden Apprenticeship Program CDBG 18.22.1 & 18.23.1 00738 - 1
DOCUMENT 00738

APPRENTICESHIP PROGRAM
ARTICLE 1 - COMPLIANCE REQUIRED

1.01 Contractor and Subcontractors shall comply with the requirements of California Labor Code §§1776, 1777.5, and 1777.6 concerning the employment of apprentices by Contractor or Subcontractors. Willful failure to comply may result in penalties, including loss of the right to Bid on or receive public works contracts.

ARTICLE 2 - CERTIFICATION OF APPROVAL

2.01 California Labor Code §1777.5, as amended, requires a Contractor or Subcontractor employing tradespersons in any apprenticeable occupation to apply to the joint apprenticeship committee nearest the site of a public works project and which administers the apprenticeship program in that trade for a certification of approval. The certificate shall also fix the ratio of apprentices to journeypersons that will be used in performance of the Contract. The ratio of work performed by apprentices to journeypersons in such cases shall not be less than one hour of apprentices work for every five hours of labor performed by journeypersons (the minimum ratio for the land surveyor classification shall not be less than one apprentice for each five journeypersons), except:

A. When unemployment for the previous three-month period in the area exceeds an average of 15 percent;
B. When the number of apprentices in training in the area exceeds a ratio of one to five; C. When a trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally; or
D. Assignment of an apprentice to any work performed under a public works contract would create a condition which would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large or if the specific task to which the apprentice is to be assigned is of such a nature that training cannot be provided by a journeyperson.

ARTICLE 3 - FUND CONTRIBUTIONS

3.01 Contractor is required to make contributions to funds established for administration of apprenticeship programs if Contractor employs registered apprentices or journeypersons in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions.

ARTICLE 4 - APPRENTICESHIP STANDARDS

4.01 Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of the California Department of Industrial Relations, or from the Division of Apprenticeship Standards and its branch offices.

ARTICLE 5 – FEDERAL REQUIREMENTS

5.01 For this project, contractors employing apprentices must provide proof of apprenticeship status from the U. S. Department of Labor – Office of Apprenticeship. Copies of Apprenticeship Agreements are not accepted as proof of apprentice registration.

END OF DOCUMENT
250

Page 390 of 510 ends

City of Shafter Library & Learning Center, Chess Garden Suppl. Conditions – Insurance and Indemnification CDBG 18.22.1 & 18.23.1 00800 - 1
DOCUMENT 00800
SUPPLEMENTARY CONDITIONS – INSURANCE AND INDEMNIFICATION ARTICLE 1 - INSURANCE

1.01 At or before the date specified in Document 00200 (Instructions to Bidders), Contractor, in order to protect the CITY OF SHAFTER (“Owner”) and its council/board members, officials, agents, officers, and employees against all claims and liability for death, injury, loss and damage as a result of Contractor’s actions in connection with the performance of Contractor’s obligations, as required in the Contract Documents, shall secure and maintain insurance as described below.

Contractor shall not perform any work under the Contract Documents until Contractor has obtained all insurance required under this section and the required certificates of insurance and all required endorsements have been filed with Owner or their authorized insurance representative. Receipt of evidence of insurance that does not comply with all applicable insurance requirements shall not constitute a waiver of the insurance requirements set forth herein. The required documents must be signed by the authorized representative of the insurance company shown on the certificate. Upon request, Contractor shall supply proof that such person is an authorized representative thereof, and is authorized to bind the named underwriter(s) and their company to the coverage, limits and termination provisions shown thereon. Contractor shall promptly deliver to Owner or their representative a certificate of insurance, and all required endorsements, with respect to each renewal policy, as necessary to demonstrate the maintenance of the required insurance coverage for the term specified herein. Such certificates and endorsements shall be delivered to Owner or their representative prior to the expiration date of any policy and bear a notation evidencing payment of the premium thereof if so requested.

Contractor shall immediately pay any deductibles and self-insured retentions under all required insurance policies upon the submission of any claim by Contractor or Owner as an additional insured.

A. Workers’ Compensation and Employers Liability Insurance Requirement -- In the event Contractor has employees who may perform any services pursuant to the Contract Documents, Contractor shall submit written proof that Contractor is insured against liability for workers’ compensation in accordance with the provisions of section 3700 of the California Labor Code.

I signing the Agreement, Contractor makes the following certification, required by section 1861 of the Labor Code:

I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake selfinsurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work pursuant to the Contract Documents.

Contractor shall require any sub-contractors to provide workers’ compensation for all of the subcontractors’ employees, unless the sub-contractors’ employees are covered by the insurance afforded by Contractor. If any class of employees engaged in work or services performed under this Agreement is not covered by California Labor Code section 3700, Contractor shall provide and/or require each sub-contractor to provide adequate insurance for the coverage of employees not otherwise covered.

Contractor shall also maintain employer’s liability insurance with limits of one million dollars ($1,000,000) for bodily injury or disease.

B. General Liability Insurance Requirements – Contractor shall maintain in full force and effect, at all times during the term of the Agreement Commercial General Liability Insurance including, but not 251

Page 391 of 510 ends

City of Shafter Library & Learning Center, Chess Garden Suppl. Conditions – Insurance and Indemnification CDBG 18.22.1 & 18.23.1 00800 - 2
limited to, Contractual Liability Insurance (specifically concerning the indemnity provisions of the Contract Documents), Products-Completed Operations Hazard, Personal Injury (including bodily injury and death), and Property Damage for liability arising out of Contractor’s performance of work under the Agreement. Contractor shall maintain the Products-Completed Operations Hazard coverage for the longest period allowed by law following termination of the Agreement.

The amount of said insurance coverage required by the Contract Documents shall be the policy limits, which shall be at least one million dollars ($1,000,000) each occurrence and two million dollars ($2,000,000) aggregate.

C. Automobile Liability Insurance Requirements – Contractor shall maintain Automobile Liability Insurance against claims of Personal Injury (including bodily injury and death) and Property Damage covering any vehicle and/or all owned, leased, hired and non-owned vehicles used in the performance of services pursuant to the Contract Documents with coverage equal to the policy limits, which shall be at least one million dollars ($1,000,000) each occurrence.

1.02 The Commercial General Liability and Automobile liability Insurance required in sub-paragraphs B. and C. above shall include an endorsement naming the Owner and Owner’s board members, their officials, officers, agents, employees and volunteers as additional insureds for liability arising out of the Agreement and any operations related thereto. Said endorsement shall be provided using one of the following three options: (i) on ISO form CG 20 10 11 85; or (ii) on ISO form CG 20 37 10 01 plus either ISO form CG 20 10 10 01 or CG 20 33 10 01; or (iii) on such other forms which provide coverage at least equal to or better than form CG 20 10 11 85.

1.03 Any self-insured retentions in excess of $100,000 must be declared on the Certificate of Insurance or other documentation provided to Owner and must be approved by the Kern County Planning and Community Development Department.

1.04 If any of the insurance coverages required under the Contract Documents is written on a claimsmade basis, Contractor, at Contractor’s option, shall either (i) maintain said coverage for at least three (3) years following the termination of this Agreement with coverage extending back to the effective date of this Agreement; or (ii) purchase an extended reporting period of not less than three (3) years following the termination of the Agreement.

1.05 Cancellation of Insurance -- The above stated insurance coverages required to be maintained by Contractor shall be maintained until the completion of all of Contractor’s obligations under the Contract Documents except as otherwise indicated herein. Each insurance policy supplied by Contractor shall not be suspended, voided, modified, canceled, or reduced in coverage or in limits except after ten (10) days notice by Contractor in the case of non-payment of premiums, or on thirty (30) days prior written notice in all other cases. This notice requirement does not waive the insurance requirements stated herein. Contractor shall immediately obtain replacement coverage for any insurance policy that is terminated, canceled, non-renewed, or whose policy limits have been exhausted or upon insolvency of the insurer that issued the policy.

1.06 All insurance shall be issued by a company or companies admitted to do business in California and listed in the current “Best’s Key Rating Guide” publication with a minimum rating of A-; VII.

Any exception to these requirements must be pre-approved by the Owner and the Kern County Planning and Community Development Department.

1.07 If Contractor is, or becomes during the term of the Agreement, self-insured or a member of a selfinsurance pool, Contractor shall provide coverage equivalent to the insurance coverages and endorsements required above. Owner will not accept such coverage unless Owner determines, in its sole discretion and by written acceptance, that the coverage proposed to be provided by Contractor is equivalent to the above-required coverages.

1.08 All insurance afforded by Contractor pursuant to the Contract Documents shall be primary to and not contributing to any other insurance or self-insurance maintained by Owner. An endorsement 252

Page 392 of 510 ends

City of Shafter Library & Learning Center, Chess Garden Suppl. Conditions – Insurance and Indemnification CDBG 18.22.1 & 18.23.1 00800 - 3
shall be provided on all policies which shall waive any right of recovery (waiver of subrogation) against Owner. A waiver of right of recovery (waiver of subrogation) is only required when Contractor’s personnel deliver services or perform service for the Owner while on Owner property.

1.09 Insurance coverages in the minimum amounts set forth herein shall not be construed to relieve Contractor for any liability, whether within, outside, or in excess of such coverage, and regardless of solvency or insolvency of the insurer that issues the coverage; nor shall it preclude Owner from taking such other actions as are available to it under any other provision of the Contract Documents or otherwise in law.

1.10 Failure by Contractor to maintain all such insurance in effect at all times required by the Contract Documents shall be a material breach of the Contract by Contractor. Owner, at its sole option, may terminate the Contract and obtain damages from Contractor resulting from said breach.

Alternatively, Owner may purchase such required insurance coverage, and without further notice to Contractor, Owner shall deduct from sums due to Contractor any premiums and associated costs advanced or paid by Owner for such insurance. If the balance of monies obligated to Contractor pursuant to the Contract are insufficient to reimburse Owner for the premiums and any associated costs, Contractor agrees to reimburse Owner for the premiums and pay for all costs associated with the purchase of said insurance. Any failure by Owner to take this alternative action shall not relieve Contractor of its obligation to obtain and maintain the insurance coverages required by the Contract Documents.

1.11 If injury occurs to any employee of Contractor, Subcontractor or sub-subcontractor for which the employee, or the employee’s dependents in the event of employee’s death, is entitled to compensation from Owner under provisions of the Workers’ Compensation Insurance and Safety Act, as amended, or for which compensation is claimed from Owner, Owner may retain out of sums due Contractor under the Contract Documents, an amount sufficient to cover such compensation, as fixed by the Workers’ Compensation Insurance and Safety Act, as amended, until such compensation is paid, or until it is determined that no compensation is due. If Owner is compelled to pay compensation, Owner may, in its discretion, either deduct and retain from the Contract Sum the amount so paid, or require Contractor to reimburse Owner.

1.12 Nothing herein shall be construed as limiting in any way the extent to which Contractor or any Subcontractor may be held responsible for payment of damages resulting from their operations.

1.13 All Subcontractors shall maintain the same insurance required to be maintained by Contractor with respect to their portions of the Work unless otherwise indicated in the Contract Documents, and Contractor shall cause the Subcontractors to furnish proof thereof to Owner within ten Days of Owner’s request.

ARTICLE 2 - RESPONSIBILITY OF CONTRACTOR AND INDEMNIFICATION

2.01 Owner and each of its officers, employees, consultants and agents including, but not limited to, the Board, Project Manager and each Owner’s Representative, shall not be liable or accountable in any manner for loss or damage that may happen to any part of the Work; loss or damage to materials or other things used or employed in performing the Work; injury, sickness, disease, or death of any person; or damage to property resulting from any cause whatsoever except their sole negligence, willful misconduct or active negligence, attributable to performance or character of the Work, and Contractor releases all of the foregoing persons and entities from any and all such claims.

2.02 To the furthest extent permitted by law (including without limitation California Civil Code §2782), Contractor shall assume defense of, and indemnify and hold harmless, Owner, their officers, employees, consultants and agents, including but not limited to the Council/Board, Project 253

Page 393 of 510 ends

City of Shafter Library & Learning Center, Chess Garden Suppl. Conditions – Insurance and Indemnification CDBG 18.22.1 & 18.23.1 00800 - 4
Manager and Owner’s officers, employees, consultants, and agents from claims, suits, actions, losses and liability of every kind, nature and description, including but not limited to claims and fines of regulatory agencies and attorney’s fees of counsel retained by Owner, expert fees, costs of staff time, and investigation costs, directly or indirectly arising out of, connected with or resulting from performance of the Work, failure to perform the Work, or condition of the Work which is caused in whole or part by any act or omission of Contractor, Subcontractors, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, resulting from any cause whatsoever.

2.03 With respect to third-party claims against Contractor, Contractor waives any and all rights to any type of express or implied indemnity against Owner and each of its officers, employees, consultants and agents including, but not limited to Owner, the Council/Board, Project Manager and each Owner’s Representative. Owner shall provide timely notice to Contractor of any thirdparty claim relating to the Contract Documents, in accordance with Section 9201 of the California Public Contract Code.

2.04 Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of Contractor, its Subcontractors of any tier, or the officers or agents of any of them.

2.05 To the furthest extent permitted by law (including, without limitation, Civil Code §2782), the indemnities, releases of liability and limitations of liability, claims procedures, and limitations of remedy expressed throughout the Contract Documents shall apply even in the event of breach of Contract, negligence (active or passive), fault or strict liability of the party(ies) indemnified, released, or limited in liability, and shall survive the termination, rescission, breach, abandonment, or completion of the Work or the terms of the Contract Documents. If Contractor fails to perform any of these defense or indemnity obligations, Owner may in its discretion back charge Contractor for Owner’s costs and damages resulting therefrom and withhold such sums from progress payments or other Contract moneys which may become due.

2.06 The indemnities in the Contract Documents shall not apply to any indemnified party to the extent of its sole negligence or willful misconduct; nor shall they apply to Owner or other indemnified party to the extent of its active negligence.

END OF DOCUMENT
254

Page 394 of 510 ends

SECTION VI
255

Page 395 of 510 ends

256

Page 396 of 510 ends

SPECIAL PROVISIONS
Project Name and Number: CITY OF SHAFTER LIBRARY AND LEARNING CENTER, CHESS GARDEN, CDBG 18.22.1 & 18.23.1
SECTION 1. OTHER DOCUMENTS
Addendum (if any) and the General Conditions, Bid Proposals, Faithful Performance Bond, Payment Bond, Plans, Specifications, and all documents appurtenant thereto, including the Standard Specifications, and all documents attached hereto are hereby incorporated herein by this reference.

Should there be any conflict between the terms of these Special Provisions and any of the above documents, including the bid proposal, these special provisions shall control and nothing herein shall be considered as an acceptance of any terms of said documents or proposal conflicting herewith (excepting Addendum which modify these Special Provisions).

SECTION 2. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED

DAMAGES
GENERAL - Attention is directed to the provisions of Sections 8-1.03, “Beginning of Work”, 8-1.06 “Time of Completion”, and 8-1.07, “Liquidated Damages”, of the Standard Specifications and these Special Provisions.

The first paragraph of Section 8-1.03 “Beginning of Work”, of the Standard Specifications, is amended to read:

As the execution of the Agreement by City is a matter of public record, Contractor will be considered to have received actual notice of the date the agreement was executed by City, on the date the agreement is so executed by City. The City may but is not required to send to Contractor written notice to proceed. Contractor's working days shall begin thirteen (13) calendar days after the date the agreement has been executed by City. Contractor shall begin work within fifteen (15) calendar days after the date said working days begin and shall diligently prosecute the same to completion before the expiration of FIFTY-SIX (56) calendar working days.

In the event that Contractor fails to complete the work within the FIFTY-SIX (56) calendar days as herein provided, for reasons or causes other than those provided for in the contract documents hereof, the City will be damaged. After considering such a breach and all aspects of the work including, but not limited to, the type of project, the current and future uses of the facilities and premises, the disarrangement of the premises and facilities thereof during the work, and the additional cost and difficulty of using the disarranged facilities during the work, the parties agree that a reasonable amount of damages for such a breach, if any, will be ONE THOUSAND DOLLARS AND NO CENTS ($1,000.00*******) per calendar day. Contractor's payment of said amount, if any, is payment of liquidated damages and not a penalty. It is understood that this amount is manifestly reasonable under the circumstances existing at the time of execution of the Agreement between Contractor and City, and it would be extremely difficult or impossible to determine with any degree of accuracy the actual damages in case of any such breach. In case of such a breach, it is agreed that City may deduct the amount thereof from the money due or to become due Contractor under the Agreement. City may withhold said liquidated damages from payments as such damages accrue, or, at City’s discretion, withhold liquidated damages from any payments due or that may become due under the agreement, including retention and final payment (pursuant to California Government Code Section 53069.85).
257

Page 397 of 510 ends

SECTION 3. TECHNICAL SPECIFICATIONS
Contractor’s attention is directed to the Approved Plans prepared by WYNN-SMITH LANDSCAPE ARCHITECTURE, INC. and signed by Timothy Michael Smith for all technical specifications for this project. There are no separate technical specifications. 258

Page 398 of 510 ends

LIBRARY These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263
TITLE SHEET LT-1.0 GENERAL NOTES 1. NO CHANGES ARE TO BE MADE WITHOUT WRITTEN CONSENT OF THE CITY ENGINEER AND THE PLANNING DIRECTOR. CHANGES WILL NOT REQUIRE PLANNING COMMISSION APPROVAL. 2. 24 HOUR INSPECTION NOTICE - PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE OFFICE OF THE CITY OF SHAFTER STANDARDS FOR LANDSCAPING, THE PROJECT AT HAND, AND AS DIRECTED BY THE CITY ENGINEER. THEY SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING. 3. COMPACTION TEST NOTE - PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE OFFICE OF THE CITY ENGINEER SHALL BE GIVEN AT LEAST 24 HOURS NOTICE. PHONE: ( 661) 746-5002. 4. FOR THE LOCATION OF EXISTING UNDERGROUND UTILITY LINES THE CONTRACTOR SHALL NOTIFY BOTH THE CITY OF SHAFTER DEPARTMENT OF PUBLIC WORKS, AND UNDERGROUND SERVICE ALERT (USA) AT LEAST TWO (2) WORKING DAYS PRIOR TO THE START OF CONSTRUCTION. USA PHONE: (800) 642-2444 CITY OF SHAFTER: (661) 746-5002 5. CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS BEFORE START OF CONSTRUCTION. A PERMIT SHALL BE OBTAIN FROM THE OFFICE OF THE CITY ENGINEER FOR ALL WORK TO BE PERFORMED IN CITY RIGHT-OF-WAY. 6. THE LOCATIONS OF EXISTING UTILITIES AND UNDERGROUND PIPELINES SHOWN ON THESE PLANS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES AND UNDERGROUND PIPELINES BEFORE COMMENCING WORK. CONTRACTOR ASSUMES ALL LIABILITY FOR ANY AND ALL DAMAGE TO EXISTING UTILITIES OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE, PRESERVE, AND PROTECT ANY AND ALL UNDERGROUND UTILITIES AND PIPELINES. 7. ANY TRENCHING CONDUCTED WITHIN THIS PROJECT SHALL BE BACKFILLED AND COMPACTED IN ACCORDANCE WITH THE CITY'S STANDARD DRAWINGS. 8. THE CONTRACTOR SHALL REMOVE AND/OR RELOCATE ALL OBSTRUCTIONS WITHIN THE STREET RIGHT-OF-WAY AS DIRECTED BY THE CITY ENGINEER. 9. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER, ENGINEER, AND THE CITY OF SHAFTER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING THE LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER/ENGINEER/CITY OF SHAFTER. 10. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN ACCORDANCE WITH CITY OF SHAFTER STANDARDS, THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION STANDARDS SPECIFICATIONS, AND AS DIRECTED BY THE CITY ENGINEER. LANDSCAPING NOTES 1. THERE SHALL BE NO SUBSTITUTIONS OR DELETIONS OF PLANT MATERIALS WITHOUT THE EXPRESS WRITTEN CONSENT OF THE CITY ENGINEER AND THE PLANNING DIRECTOR. 2. ALL LANDSCAPING PLANT MATERIALS AND RELATED INFRASTRUCTURE SHALL BE INSTALLED IN ACCORDANCE WITH THE CITY OF SHAFTER STANDARDS FOR LANDSCAPING AND AS DIRECTED BY THE CITY ENGINEER. SHAFTER LIBRARY LANDSCAPE PLANS CITY OF SHAFTER VICINITY MAP NOT TO SCALE LANDSCAPE ARCHITECT CERTIFICATE I HEREBY CERTIFY THAT THESE PLANS AND SPECIFICATIONS COMPLY WITH CITY OF SHAFTER ORDINANCES, STANDARDS, AND DESIGN CRITERIA, AND THAT THEY INCLUDE ALL IMPROVEMENTS IN ACCORDANCE WITH THE LANDSCAPE REQUIREMENTS OF THE CITY OF SHAFTER FOR THIS DEVELOPMENT. I AM RESPONSIBLE FOR ALL CALCULATIONS AND DRAWINGS ON THESE PLANS AND ANY ERRORS, OMISSIONS, OR VIOLATIONS OF THOSE ORDINANCES, STANDARDS, AND DESIGN CRITERIA SHALL BE CORRECTED DURING CONSTRUCTION. LANDSCAPE ARCHITECT TIMOTHY M. SMITH, PLA, ASLA WYNN-SMITH LANDSCAPE ARCHHITECTURE, INC. 13319 POWAY ROAD, SUITE 150 POWAY, CA 92064 OFFICE: (858) 513-0030 GENERAL LEGEND WOOD FENCE EXISTING FENCE SHEET DESCRIPTION LT-1.0 TITLE SHEET L-1.0 DEMO PLAN L-1.1 AMENITIES PLAN L-2.0 LAYOUT PLAN L-2.1 LAYOUT PLAN L-2.2 ACCESSIBLE PLAN L-3.0 CONSTRUCTION DETAILS L-3.1 CONSTRUCTION DETAILS L-3.2 CONSTRUCTION DETAILS L-3.3 CONSTRUCTION DETAILS L-4.0 IRRIGATION PLAN L-4.1 IRRIGATION DETAILS L-4.2 IRRIGATION DETAILS L-5.0 PLANTING PLAN L-5.1 PLANTING DETAILS L-6.0 HYDROZONE PLAN SHEET INDEX PROJECT LOCATION 236 JAMES STREET CENTRAL VALLEY HWY JAMES STREET

SHAFTER AVE N O R T H

Page 399 of 510 ends

LIBRARY D-101 D-101 D-102 D-102 D-102 D-103 D-102 02-01 02-01 D-102 02-02 SYMBOL CODE DESCRIPTION QTY CONCRETE TO BE REMOVED 221 SF MOW CURB TO BE REMOVED FENCE TO BE REMOVED D-101 D-102 D-103 DEMOLITION SCHEDULE CODE DESCRIPTION EXISTING TREES TO REMAIN EXISTING WALL/FENCE TO REMAIN 02-01 02-02 02 EXISTING CONDITIONS SCHEDULE These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263
DEMOLITION PLAN L-1.0 N O R T H
0SCALE: 10 20 30 feet 1" = 10'

Page 400 of 510 ends

LIBRARY 11 1 3 4 5 99 2 2 4 57 6 10 11S-102 S-115 13 S-113 1412 9 1515 9 S-105 S-105 S-104 S-104 S-104 S-104 S-103 S-107 S-106 S-106 S-106 S-101 S-110 S-111 S-109 S-108 S-116 S-116 S-116 S-112 S-108 82 8 16 SYMBOL CODE DESCRIPTION QTY DETAIL D.G. - 4" THICK DECOMPOSED GRANITE 3/8", COLOR TO BE GOLD DUST. PLACE IN 2" LIFTS, COMPACT TO 90%, WET, THEN PLACE FINAL 2" LIFT. DG FROM MARANATHA LANDSCAPE, BAKERSFIELD, CA OR SUPPLIER WITH MATCHING COLOR. 1,206 SF 2/L-3.0 SYNTHETIC TURF - SYNTIPEDE 343 BY SYNLAWN 379 SF 5/L-3.0 4' HT. SERPENTINE WALL WITH STUCCO FINISH TO MATCH BUILDING 83 LF 2/L-3.1 8' HT. STUCCO WALL WITH STUCCO FINISH TO MATCH BUILDING 53 LF 1/L-3.1 5' HT. WOOD FENCE 74 LF 4/L-3.1 8' HT. WOOD GATE - DOUBLE SWINGING 3/L-3.1 5' HT. WOOD ENTRY GATE 5/L-3.1 4" THICK CONCRETE PAVING - COLOR TO BE NATURAL GREY WITH LIGHT BROOM FINISH 56 SF 3/L-3.0 ALUMINIUM EDGING 493 LF 1/L-3.0 LIBRARY ROOF OVERHANG GATE TRELLIS 1/L-3.2 CONCRETE MOW CURB 42 LF 4/L-3.0 FREESTANDING DOOR 2/L-3.2 MIRROR WALL 3/L-3.2 EXISTING WALL MAINTENANCE GATE - 8' HT. 30" WIDE CHAINLINK GATE WITH SLATS 12345678910111213141516 REFERENCE NOTES SCHEDULE SITE FURNISHINGS IRON VALLEY TRASH RECEPTACLE BY KINGS RIVER CASTING (MODEL NO. IVTR); COLOR TO BE BLACK OR EQUAL. INSTALL PER MANUFACTURER`S STANDARDS. SET ON CONCRETE BASE. 1 3/L-3.3 COMMUNITY DONATED BICYCLE WITH BASKET. LOCK TO ADJACENT FENCE. DINING CHAIRS - (3) SIGNATURE DINING CHAIRS BY POLYWOOD. COLOR - GREEN. 3 4/L-3.3 RIVERSTONE BENCH - 67L, BY KINGS RIVER CASTING - MODEL #RVSB-67. BENCH TO BE WITHOUT ARMS. 4 2/L-3.3 ADIRONDACK CHAIR - COTTAGE CURVEBACK BY POLYWOOD. COLOR - LIME. 2 5/L-3.3 ROUND 18 INCH SIDE TABLE BY POLYWOOD. COLOR - LIME. 3 7/L-3.3 RIVIERA MODERN LOUNGE CHAIR BY POLYWOOD. COLOR - GREEN. 2 6/L-3.3 ADULT CHESS TABLE - ADA CONCRETE CHESS TABLE WITH SQUARE STEEL POST LEG BY KENNETH LYNCH & SONS. 2 1/L-3.3 KIDS CHESS TABLE - CONCRETE CHESS TABLE WITH SQUARE STEEL POST LEG BY KENNETH LYNCH & SONS, SET AT 27 INCH HEIGHT. 1 1/L-3.3 ADULT STOOL - 18 INCH SQUARE BY DOTY&SONS. 2 KIDS STOOL - 14 INCH SQUARE BY DOTY&SONS. 2 WICKER HANGING CHAIR. TO BE PURCHASED BY THE CITY. 2 18X18 FT UMBRELLA WITH THE POST, BY PACIFIC PLAY SYSTEMS (BY DEFERRED SUBMITTAL) ILLUSION MIRROR - GIGGLE MIRROR HEAD STRETCHER BY CARNIVAL DEPOT MIRROR BALL. TO BE PURCHASED BY THE CITY. 3 S-101 S-102 S-103 S-104 S-105 S-106 S-107 S-108 S-109 S-110 S-111 S-112 S-113 S-115 S-116 These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263
AMENITIES PLAN L-1.1 N O R T H 0SCALE: 10 20 30 feet 1" = 10' 1 11 1 PATHWAY SLOPES NOT TO EXCEED 2% CONTRACTOR TO REGRADE THIS AREA TO SLOPE REPLACE CONCRETE LANDING. COORDINATE FLATWORK WITH TRELLIS POST FOOTING INSTALLATION

Page 401 of 510 ends

R3'-0"
R8'-5" R8'-0"
R3'-6"
R7'-0"
R8'-0"
R4'-6"
R1'-7"
R4'-0"
4'-2" 4'-2" 8'-3" 7'-5" 2'-11"5'-10"
1'-3"
2'-11" 6'-0" 6'-5"
11"
4'-4" 6'-10" 4'-4"
R6'-0"
9"
5'-8"
8'-1"
5'-6"
7'-6"
8'-3" 4'-11" 6'-9" 6" 2'-6" 5'-6" 11" 6" 2'-0" 5'-3" 11'-0" 6'-5" 6'-6"
10" 3'-0"
3'-0" TYP.
4'-0"
R2'-0"
R5'-7" 11'-1"
4'-0" 4'-6"
4'-0" 1'-6" These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263

LAYOUT PLAN -
ENLARGEMENT L-2.0
0SCALE:
4 8 12 feet 1/4" = 1'-0" N O R T H MATCHLINE - SEE SHEET L-2.0 EXISTING WALL TO REMAIN

Page 402 of 510 ends

R8'-6" 6'-1" 1'-5" R5'-6"
6'-6" 2'-4"
6"
10'-4" 9'-10" 6'-2"
R7'-9" R1'-9" 3'-9" 10" 4'-5"
2'-6" 3'-8"
2'-7"
1'-6"
2'-11" 10'-1" R10'-3" 8'-11" 10" R2'-6" R8'-0" R3'-11"
5'-0"
5'-0"
R6'-6"
4'-0"
3'-1"
5'-4" 3'-9"
7"
8" 9'-1" 1'-0" 6'-0" 6'-1" 1'-4" 21'-0"
3'-9" 3'-5"
4"
5" 5'-0"
4'-2" 4'-2" 4'-2" 8'-4" 8'-3" 7'-5" R14'-0"
14'-0" 9'-6"
5'-8" R2'-0" 1'-4" R2'-0"
3'-0"
R2'-6" ALIGN
R9'-6"
R6'-6"
R20'-0"
R14'-0" R2'-0" R2'-0" 3'-7" 3'-0" 5'-3" 2'-0"
3'-10" 2" R10'-9" 1'-6"
1'-0"
3'-0" 5'-5"
5'-0" R6'-1" 1'-3"
3'-0"
R7'-6"
R10'-11"
R14'-0"
3'-0" TYP. 2'-6"
2'-8" These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263

LAYOUT PLAN -
ENLARGEMENT L-2.1 0SCALE: 4 8 12 feet 1/4" = 1'-0" N O R T H MATCHLINE - SEE SHEET L-2.0 ROOF OVERHANG CONTRACTOR TO RAISE GRADE IN THIS AREA 0" - 12" AGAINST NEW RETAINING WALL BUT ALLOW SHEETFLOW SURFACE DRAINAGE TOWARDS WALL. WALL TO HAVE WEEP HOLES EVERY 32" TO ALLOW DRAINAGE TO FLOW THROUGH WALL.

SLOPE TO DRAIN
1-2% MAX.

Page 403 of 510 ends

LIBRARY These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263
ACCESSIBLE PLAN L-2.2 N O R T H 0SCALE: 10 20 30 feet 1" = 10' ACCESSIBLE FURNITURE TOTAL NUMBER OF CHESS TABLES TOTAL ACCESSIBLE CHESS TABLES WITH ACCESSIBLE PATHS TOTAL NUMBER OF BENCHES WITH ADJACENT WHEELCHAIR SPACE WITH FRONT ACCESS TOTAL ACCESSIBLE BENCHES WITH ADJACENT WHEELCHAIR SPACE WITH FRONT ACCESS TOTAL NUMBER OF BENCHES TOTAL ACCESSIBLE BENCHES 3 3 4 3 4 3 ACCESSIBLE FEATURES ACCESSIBLE CIRCULATION WHEELCHAIR SPACE (36" X 48") 1 67" FIXED SEAT BENCH - SEATS 3 PERSONS @18" SEATING PER PERSON. BENCH IS 33% ACCESSIBLE 67" FIXED SEAT BENCH - SEATS 3 PERSONS @18" SEATING PER PERSON. BENCH IS 33% ACCESSIBLE ADULT CHESS TABLE- SEATS 3 PERSONS. TABLE IS 50% ACCESSIBLE KIDS CHESS TABLE- SEATS 2 PERSONS. TABLE IS 50% ACCESSIBLE ADULT CHESS TABLE- SEATS 2 PERSONS. TABLE IS 50% ACCESSIBLE

Page 404 of 510 ends

LEGEND 6" 0R 8" SEE PLANS
1'-0" 1 345 6 7108 9 2% MIN. 11
3" SYNTHETIC TURF-SECURE TO BASE PER MANUF. RECOMMENDATIONS 12 1/2" RADIUS TOOLED EDGE, TYP. 34 FINISH GRADE - SHRUB AREA CAST OR EXTRUDED CONCRETE CURB W/ 3/8" TOOLED JOINTS @ 10' O.C. & 3/8" EXPANSION JOINTS @40' O.C. MAX. SMOOTH TROWEL FINISH 56 TUCK AND NAIL EDGES OF TURF 7 #3 CONT. TOP AND BOTTOM 8 90% COMPACTED SUBGRADE 4" MIN. CLASS II PERMEABLE BASE COMPACTED TO 95% 910 2 x 4 TREX NAILER, LAG TO CURB 1/2" WASHED SILICA SAND FILL LAYER PER MANUF. RECOMMENDATIONS 11 6" 0R 8" SEE PLANS 1'-0" 13 2 56 7108 9 2% MIN. 11
1/2" MAX. 1:2 MAX BEVEL ABOVE 1/4" CONCRETE CURB AT SYNTHETIC TURF 1 1/2" = 1'-0" 1/2" MAX, TYP. 1:2 MAX BEVEL ABOVE 1/4" FINISH GRADE - D.G. PAVING PLANTING AREA CONDITION D.G. AREA CONDITION 6 P-20-SHA-41 LEGEND SYNTHETIC TURF ON AGGREGATE BASE 1 1/2" = 1'-0" 6" 1'-0" 1 4 5 97 8 10 3 2% MIN.
1/2" MAX. 6 L-3.0 1 SYNTHETIC TURF, PER PLANS. 1/2" RADIUS TOOLED EDGE, TYP. 2 SMOOTH AND SLOPE SUBGRADE TO DRAIN 2% MIN. 34 ADJACENT CONCRETE CURB, SEE 5 TUCK AND NAIL EDGES OF TURF SEE CONST. PLANS FOR PLAN VIEW OF PIPE LAYOUT 6 90% COMPACTED SUBGRADE, SLOPE TO SUBDRAIN 7 4" MIN. CLASS II PERMEABLE BASE COMPACTED TO 95% 8 2 x 4 TREX NAILER, LAG TO PAVEMENT OR CURB 9 1/2" WASHED SILICA SAND FILL LAYER PER MANUF. RECOMMENDATIONS 10 1:2 MAX BEVEL ABOVE 1/4" 11 11 FINISHED SURFACE, PER PLANS 2 5 P-20-SHA-08 www.surelocedging.com SURE-LOC ALUMINUM EDGING CORPORATION 494 EAST 64TH ST HOLLAND, MI 49423 TOLL FREE: 1-800-787-3562 PHONE: (616) 392-3209 FAX: (616) 392-5134 ® SURE-LOC ALUMINUM LANDSCAPE EDGING NOT TO SCALE 1 2 3 4 5 1. DESIRED SIZE: 316" X 4" X16' (.182 -.188" AVERAGE THICKNESS) 2. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS NOTES 1 STEEL EDGING 2 SPECIFIED BEDDING MATERIAL TOP OF EDGING NO MORE THAN 1/2" BELOW TOP OF EDGING 34 TURF 5 TAPERED STEEL STAKES TO INTERIOR OF BED AREA LEGEND 1/8" X 4" X 16' (.120-.125" AVERAGE THICKNESS) 14GA. X 4" X 10' (.070-.075" AVERAGE THICKNESS) SELECT DESIRED SIZE 3/16" X 4" X 16' (.182-.188" AVERAGE THICKNESS) 1/4" X 5" X 16' (.20 - .250" AVERAGE THICKNESS) 1 P-20-SHA-01 These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263

CONSTRUCTION
DETAILS L-3.0 STABILIZED DECOMPOSED GRANITE PAVING 1" = 1'-0" 2" LEGEND NOTES 1. D.G. STABILIZER TO BE BLENDED AT THE RATE OF 10 LBS. PER TON OF D.G. 2. D.G. PER REFERENCE NOTE SCHEDULE 2 1 3 4 1 L-3.0 4" LAYER OF DECOMPOSED GRANITE 3/8", COLOR TO BE GOLD DUST. 1 PERMALOC ALUMINUM RESTRAINT PER 23 FINISH GRADE 4 90% COMPACTED SUBGRADE P-20-SHA-05 2 CONCRETE PAVING 3/4" = 1'-0" 1 234 2 1 CONCRETE PAVING 3/8" EXP. JOINT @ 20' O.C. MAX. OR DEEP JOINTS @ 10' O.C. (UNLESS OTHERWISE SHOWN) 23 3/4" TOOLED JOINT UNLESS OTHERWISE SHOWN 4 90% COMPACTED SUBGRADE SECTION PLAN LEGEND 3 P-20-SHA-03 LEGEND 1 2 4 35 1 2 4 4 1 2 4 LAWN CONDITION PLANTING CONDITION D.G. CONDITION CONCRETE MOW CURB 1" = 1'-0" 2" 6" 6"2" 6" 6"
2" 6" 6" 1 CONCRETE MOW CURB 2 COMPACTED SUBGRADE 3 ADJACENT PLANTING 4 ADJACENT LAWN ADJACENT DECOMPOSED GRANITE 5 4 P-20-SHA-06

Page 405 of 510 ends

LEGEND: 14 6 7 5 8 14 1 2 X 4 WOOD GATE FRAME 23 95% COMPACTED SUBGRADE 4 (6) HEAVY DUTY GATE HINGES 5 GATE HANDLE 6 FINISHED GRADE 7 CANE BOLT 8 2 X 6 WOOD CROSS BRACES 8' WOOD GATE - DOUBLE SWINGING 3/4" = 1'-0" 1X6 WOOD BOARD (HORIZONTAL WITH 1" BETWEEN EACH BOARD) 2 2 NOTES: 1. 1 x 6 HORIZONTAL BOARDS TO BE CEDAR, ALL OTHER WOOD TO BE CONSTRUCTION GRADE DOUGLAS FIR. 2. ALL HARDWARE TO BE GALVANIZED. 3. STAIN ALL WOOD WITH NATURAL COLOR SEALANT. 3 3 9 CONCRETE FOOTING 9 1 L-3.1 1 L-3.1 3 P-20-SHA-15 These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263

CONSTRUCTION
DETAILS L-3.1
10" LEGEND 5 6 23 2'-6"1'-6" 8' HT. STUCCO WALL 3/4" = 1'-0"8'-0" 147 8" BLOCK WALL WITH STUCCO FINISH TO MATCH BUILDING. 12 #4 BAR (HORIZONTAL) AS SHOWN 3 #4 BAR @ 32" O.C. CENTERED IN WALL SLIGHTLY ROUNDED STUCCO TOP TO ALLOW WATER RUN-OFF 45 FINISH GRADE 6 CONCRETE FOOTING 7 95% COMPACTED SUBGRADE 1 P-20-SHA-02 LEGEND 5 23 4' HT. STUCCO WALL 3/4" = 1'-0" 4'-0" 14 8" BLOCK WALL WITH STUCCO FINISH TO MATCH BUILDING. 12 #4 BAR (HORIZONTAL) AS SHOWN 3 #4 BAR @ 32" O.C. CENTERED IN WALL SLIGHTLY ROUNDED STUCCO TOP TO ALLOW WATER RUN-OFF 45 FINISH GRADE 6 CONCRETE FOOTING 7 95% COMPACTED SUBGRADE INTERIOR SIDE STREET SIDE 1'-4"

HEIGHT VARIES - SEE SITE PLAN

FOR APPROPRIATE ELEVATIONS
APPROXIMATELY 12"
1'-0" 10" WEEP HOLES (4" TALL X1" WIDE) EVERY OTHER BLOCK 8 8 EXISTING GRADE 1% P-20-SHA-11 2 NOTES: 1. 1 x 6 HORIZONTAL BOARDS TO BE CEDAR, ALL OTHER WOOD TO BE CONSTRUCTION GRADE DOUGLAS FIR. 2. ALL HARDWARE TO BE GALVANIZED. 3. STAIN ALL WOOD WITH NATURAL COLOR SEALANT. LEGEND 5' WOOD ENTRY GATE 3/4" = 1'-0" 4" SQ. GALV. TUBULAR STEEL POST WITH CAP-WELDED FLUSH AND SMOOTH W/POST 12 2 x 4 WOOD GATE FRAME CONCRETE FOOTING - SLOPE TOP TO DRAIN 34 95% COMPACTED SUBGRADE 5 (3) HEAVY DUTY GATE HINGES 678 2 x 6 WOOD CROSS BRACE 9 FINISHED GRADE 1 5 26 2 3 1 9 4 ABU44Z ADJUSTABLE POST BASE WITH UPLIFT, BY SIMPSON STRONG TIE 10 10 1X6 WOOD BOARD (HORIZONTAL WITH 1" BETWEEN EACH BOARD) 4 L-3.1 8 7 ADA COMPLIANT LEVER TYPE LOCKING HANDLE ON BOTH SIDES OF THE GATE 5 P-20-SHA-17 LEGEND 12 4 5 1 4X4 WOOD POST AT 6' O.C. 1X6 WOOD BOARD (HORIZONTAL 2 WITH 1" BETWEEN EACH BOARD) 3 CONCRETE FOOTING FOR POSTS, SLOPE TOP TO DRAIN 45 FINISHED GRADE 36 95% COMPACTED SUBGRADE ABU44Z ADJUSTABLE POST BASE WITH UPLIFT, BY SIMPSON STRONG TIE 6 ELEVATION SECTION NOTES: 1. 1 x 6 HORIZONTAL BOARDS TO BE CEDAR, ALL OTHER WOOD TO BE CONSTRUCTION GRADE DOUGLAS FIR. 2. ALL HARDWARE TO BE GALVANIZED. 3. STAIN ALL WOOD WITH NATURAL COLOR SEALANT. 2 1 5 5' HT. WOOD FENCE 3/4" = 1'-0" 4 P-20-SHA-19 1 1

Page 406 of 510 ends

MIRROR WALL 1/2" = 1'-0" NOTES: 1. ALL WOOD TO BE DOUG FIR. 2. ALL FASTENERS TO BE STAINLESS STEEL. 3. DO NOT INSTALL MIRROR POSTS UNTIL MIRROR IS ON SITE. LEGEND 1345 2 1 6X6 WOOD POST 2 FINISH GRADE APB66 SIMPSON POST BASE. INSTALL PER MANUFACTURER'S RECOMMENDATIONS 3 CONCRETE FOOTING AT POST, TYPICAL 4 6' HT. FUNHOUSE MIRROR NATURAL (SKU: FM-SFRD6N) BY CARNIVAL DEPOT 5 ATTACH MIRROR FRAME TO WOOD POSTS WITH 1/4"X2" GALVANIZED SCREWS (4 ON EACH SIDE) 6 6 P-20-SHA-32 3 These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263

CONSTRUCTION
DETAILS L-3.2 GATE TRELLIS 1/2" = 1'-0" SECTION ELEVATION PLANVIEW LEGEND 1 1 8X8 WOOD POST 2 10X6 WOOD BEAM 4X6 WOOD RAFTERS, 36" O.C. 4 CONCRETE FOOTING 6 90% COMPACTED SUBGRADE 7 4X4WOOD RAFTERS, 10" O.C. 53 2 43 7 2 156 FINISHED GRADE 43 2143 7 4 L-3.1 8 8 ABU88Z ADJUSTABLE POST BASE WITH UPLIFT, BY SIMPSON STRONG TIE 9 1/2" CARRIAGE BOLTS (2)9 NOTES: 1. ATTACH WOOD MEMBERS TO LOWER WOOD, EXCEPT WHERE NOTED, WITH 10d GALVANIZED NAILS. 2. ALL WOOD TO BE DOUGLAS FIR #1 AND BETTER. 3. APPLY NATURAL STAIN TO ALL WOOD. 10 10 WATERPROOF SEALANT ON TOP OF POSTS 11 11 10d GALVANIZED NAILS 9 1 P-20-SHA-18 FREESTANDING DOOR 1/2" = 1'-0" ELEVATION - NORTH LEGEND 6X6 DOOR FRAME MITRED AT T0P CORNERS 1 3068 DOOR (SOLID) HINGED TO DOOR FRAME. DOOR TO BE 6 PANEL DOOR 2 CONCRETE FOOTING 4 D.G. PER PLAN 653 1 FINISHED GRADE SECTION NOTES: 1. DOOR TO BE PAINTED RED 2. ALL DOOR FRAME WOOD TO BE DOUGLAS FIR AND PAINTED WHITE 3. ALL HARDWARE TO BE GALVANIZED 21 3 4 4 6 5 3 ABU66Z ADJUSTABLE POST BASE WITH UPLIFT, BY SIMPSON STRONG TIE 7 ADA COMPLIANT LEVER TYPE HANDLE ON BOTH SIDES OF THE DOOR 7 8 COMPACTED SUBGRADE 8 2 P-20-SHA-21 1 1 1

Page 407 of 510 ends

LOUNGE CHAIR NTS
6 P-20-SHA-38 ADA CONCRETE CHESS TABLE NTS
1 P-20-SHA-33 RIVERSTONE BENCH NTS
2 P-20-SHA-34 TRASH RECEPTACLE NTS
3 P-20-SHA-35 CHAIR NTS
4 P-20-SHA-39 ADIRONDACK CHAIR NTS
5 P-20-SHA-36 18-IN ROUND TABLE NTS
7 P-20-SHA-37 These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263

CONSTRUCTION
DETAILS L-3.3
1

Page 408 of 510 ends

LIBRARY FSMV APPROXIMATE LOCATION OF EXISTING BACKFLOW PREVENTER CONTRACTOR TO DETERMINE, IN FIELD, BEST LOCATION TO CONNECT NEW IRRIGATION TO EXISTING MAIN LINE.

F
F
F
F
F
R
3 4"
3 4"3
4"
3 4"
3 4"
3 4"3
4"
1 1.39
3 4" 4.25
21" 1.4
3 3
4" 2.92
4 3
4"
5 0.5 1"
6 1.91
3 4"
7 0.83
3 4"
1 2"
C SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY PSI DETAIL RAIN BIRD 1800-1400 FLOOD FIXED FLOW RATE 0.25 GPM - 2.0 GPM, FULL CIRCLE BUBBLER, 1/2IN. FIPT. 19 30 4/L-4.1 SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL RAIN BIRD LFV-075 3/4IN. LOW FLOW DV VALVE 5 10/L-4.1 RAIN BIRD MDCFCAP DRIPLINE FLUSH VALVE CAP IN COMPRESSION FITTING COUPLER.5 3/L-4.2 AREA TO RECEIVE DRIPLINE RAIN BIRD XFCV-06-18 XFCV ON-SURFACE LANDSCAPE DRIPLINE WITH A HEAVY-DUTY 3.5 PSI CHECK VALVE. 0.6 GPH EMITTERS AT 18" O.C. DRIPLINE LATERALS SPACED AT 18" APART, WITH EMITTERS OFFSET FOR TRIANGULAR PATTERN. GREAT FOR ELEVATION CHANGE. SPECIFY XF INSERT FITTINGS. 1,327 L.F. 4/L-4.2 SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL RAIN BIRD PGA-PRS-D ANGLE 1IN., 1-1/2IN., 2IN. ELECTRIC REMOTE CONTROL VALVE, ANGLE. WITH PRESSURE REGULATOR MODULE. 2 2/L-4.2 RAIN BIRD 33-DLRC 3/4IN. BRASS QUICK-COUPLING VALVE, WITH CORROSION-RESISTANT STAINLESS STEEL SPRING, LOCKING THERMOPLASTIC RUBBER COVER, DOUBLE TRACK KEY LUG, AND 2-PIECE BODY.2 9/L-4.1 RAIN BIRD PGA-PRS-D ANGLE 1" 1IN., 1-1/2IN., 2IN. ELECTRIC MASTER VALVE, ANGLE. WITH PRESSURE REGULATOR MODULE. 1 5/L-4.1 RAIN BIRD ESP4ME3 WITH (2) ESP-SM3 10 STATION, HYBRID MODULAR OUTDOOR CONTROLLER. FOR RESIDENTIAL OR LIGHT COMMERCIAL USE. LNK WIFI MODULE AND FLOW SENSOR READY. 1 1/L-4.1 RAIN BIRD RSD-BEX RAIN SENSOR, WITH METAL LATCHING BRACKET, EXTENSION WIRE. 1 8/L-4.1 RAIN BIRD FS-100-B 1" FLOW SENSOR FOR USE WITH RAIN BIRD MAXICOM, SITECONTROL, AND ESP-LXD CENTRAL CONTROL SYSTEMS. BRASS MODEL. SUGGESTED OPERATING RANGE OF 2.0 GPM TO 40.0 GPM. SENSORS SHOULD BE SIZED FOR FLOW RATHER THAN PIPE SIZE. 1 6/L-4.1 POINT OF CONNECTION 1" SHAFTER CITY PUBLIC WORKS DEPARTMENT 1 IRRIGATION LATERAL LINE: PVC CLASS 200 SDR 21 542.0 L.F. 3/L-4.1 IRRIGATION MAINLINE: PVC SCHEDULE 40 195.4 L.F. 1401 1402 1404 FMVC
RFS #"
# Valve Number Valve Size Valve Flow Valve Callout
# IRRIGATION SCHEDULE NUMBER MODEL SIZE TYPE GPM PSI PSI @ POC PRECIP 1 RAIN BIRD LFV-075 3/4" AREA FOR DRIPLINE 1.39 23.2 28.3 0.43 in/h 2 RAIN BIRD PGA-PRS-D ANGLE 1" BUBBLER 4.25 36.1 50.6 0.89 in/h 3 RAIN BIRD LFV-075 3/4" AREA FOR DRIPLINE 1.4 23.2 28.9 0.43 in/h 4 RAIN BIRD LFV-075 3/4" AREA FOR DRIPLINE 2.92 23.5 33.2 0.43 in/h 5 RAIN BIRD PGA-PRS-D ANGLE 1" BUBBLER 0.5 34.3 38.9 1.12 in/h 6 RAIN BIRD LFV-075 3/4" AREA FOR DRIPLINE 1.91 23.3 31.1 0.43 in/h 7 RAIN BIRD LFV-075 3/4" AREA FOR DRIPLINE 0.83 23.2 28.2 0.43 in/h VALVE SCHEDULE Generated: 2024-11-19 16:09 P.O.C. NUMBER: 01 Water Source Information: Shafter City Public Works Department FLOW AVAILABLE Point of Connection Size: 1" Flow Available 19.62 GPM PRESSURE AVAILABLE Static Pressure at POC: 62 PSI Pressure Available: 62 PSI DESIGN ANALYSIS Maximum Station Flow: 4.25 GPM Flow Available at POC: 19.62 GPM Residual Flow Available: 15.37 GPM Critical Station:
2 Design Pressure: 30 PSI Friction Loss: 1.12 PSI Fittings Loss: 0.11 PSI Elevation Loss: 0 PSI Loss through Valve: 4.87 PSI Pressure Req. at Critical Station: 36.1 PSI Loss for Fittings: 0.87 PSI Loss for Main Line: 8.7 PSI Loss for POC to Valve Elevation: 0 PSI Loss for Backflow: 0 PSI Loss for Master Valve: 4.87 PSI Critical Station Pressure at POC: 50.5 PSI Pressure Available: 62 PSI Residual Pressure Available: 11.5 PSI CRITICAL ANALYSIS These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263
IRRIGATION PLAN L-4.0 N O R T H
0SCALE: 10 20 30 feet 1" = 10'
1

Page 409 of 510 ends

1 1/2" = 1'-0" MASTER CONTROL VALVE 5 328406.23-01 1 1/2" = 1'-0" QUICK COUPLING VALVE IN BOX NOTES 1. PLACE ONE QUICK COUPLING VALVE EVERY 100' ALONG MAINLINE. 2. SUPPLY WITH 2 KEYS, QB44KAT10 OR APPROVED EQUAL, & MATCHING HOSE SWIVELS AS PART OF TURNOVER PACKAGE. 3. VALVE SHALL BE IDENTIFIED BY 'QVC' WITH CHRISTY'S STANDARD POLYURETHANE VALVE TAG OR APPROVED EQUAL, COLOR SHALL BE YELLOW, SINGLE SIDED. FOR NON-POTABLE IRRIGATION SYSTEMS, INCLUDE VALVE TAG STATING, 'WARNING: NON-POTABLE WATER, 1 2 3 45678 9 10 11 1 2 STAINLESS STEEL CLAMPS 2 FINISHED GRADE 10" DIA. VALVE BOX. HEAD BRAND 'QVC' ON LID WITH 2" HIGH CHARACTERS. 3 FLUSH IN LAWN AREAS. 2" IN SHRUB AREAS 4 QUICK COUPLING VALVE AS SPECIFIED 56 GALV. NIPPLE LENGTH AS REQ. 6" DEEP LAYER OF 3/4" CRUSHED ROCK. 78 3" PVC SCHEDULE 80 NIPPLE 9 1/2" X 36" GALV STEEL PIPE 10 3 PVC SCH 80 ELLS 11 12" PVC SCHEDULE 80 NIPPLE DO NOT DRINK' ON CHRISTY'S STANDARD POLYURETHAN VALVE ID TAG OR APPROVED EQUAL, COLOR SHALL BE PURPLE, SINGLE SIDED.FOR RECLAIMED WATER SYSTEMS, CONTRACTOR TO USE PURPLE LIDS AND HANDLES LEGEND 9 328406.43-02 1" = 1'-0" MASTER CONTROL VALVE AND FLOW SENSOR ASSEMBLY 6 328406.23-03 1 1/2" = 1'-0" TRUE UNION BALL ISOLATION VALVE 1 2 3 4 56 7 1 ISOLATION BALL VALVE AS SPECIFIED, SAME SIZE AS MAIN LINE 2 RECTANGULAR BOX WITH EXTENSION AS NECESSARY 3 20" X 14" JUMBO PLASTIC VALVE BOX WITH BRANDED LID 4 SET BOX 1" ABOVE GRADE 5 SCHEDULE 80 THREADED NIPPLE AS REQUIRED 6 PVC MAIN LINE 7 CONCRETE BLOCK CAPS, ON EACH SIDE OF BOX LEGEND NOTES 1. USE TEFLON TAPE ON THREADED CONNECTION. 2. FOR RECLAIMED WATER SYSTEMS, CONTRACTOR TO USE PURPLE LIDS AND HANDLES 7 328406.33-04 RAIN SENSOR - ROOF BRACKET 1" = 1'-0" 123456 1 EAVE OF BUILDING RAIN SENSOR - RAIN BIRD RSD-BEx 2 WIRE TO IRRIGATION CONTROLLER 34 PLASTIC TIE DOWN STRAP 5 MOUNTING BRACKET SECURE WIRE WITH CABLE TIE BRACKET (1 OF 2) 6 LEGEND 8 328409.83-01 1 1/2" = 1'-0" 3/4" DRIP VALVE/FILTER/REGULATOR 10 328413.76-13 1" = 1'-0" WALL MOUNT CONTROLLER 1 328409.13-01 3" = 1'-0" BUBBLER ON FLEX HOSE RISER 1 2 3 4 5 6 7 8 9 1 PVC SLIP-THREAD ADAPTER BUBBLER NOZZLE AS SPECIFIED 23 3" ABOVE GRADE WATER WELL AS PER PLANTING DETAIL 45 FINISHED GRADE 6 ROOT BALL 1/2" IPS FLEX HOSE WITH PVC FLEX GLUE AND PRIMER. LENGTH AS REQUIRED. 7 8 PCV LATERAL LINE PVC SLIP-THREAD ADAPTER 9 FOR EXISTING TREES- PLACE IN OUTER 25% OF CANOPY LEGEND NOTES: FOR TREES WITH 2 OR MORE BUBBLERS, SEE ROOT WATERING SYSTEM RWS DETAIL. 4 1 1/2" = 1'-0" 328403.53-01 MAINLINE PIPE TRENCH WITH SAND DETAIL PAVING OR FINISH GRADE BACKFILL WITH REJECT SAND AND COVER WITH 6" OF NATIVE SOIL NOTES: 1. ADD DETECTABLE WARNING TAPE INSTALLED 12" ABOVE ALL MAINLINE. TAPE TO SAY: CAUTION BURIED WATER LINE BELOW. 2. CONTROL WIRES TO BE TAPED TO SIDE OF MAINLINE EVERY 10'-0". 2 P-20-SHA-28 LEGENDPIPE TRENCHING DETAIL 1" = 1" 123456 7 1 FINISH GRADE CLEAN BACKFILL - SEE SPECS. FOR MATERIAL W/ 90% COMPACTION REQUIRED 23 NON-PRESSURE LATERAL LINE 4 INSTALL WARNING TAPE 3" ABOVE MAINLINE 5 PRESSURE SUPPLY LINE 6 PROVIDE 2" OF CLEAN BACKFILL CONTROLL WIRES - BUNDLE AND TAPE AT 15"O.C. AND INSTALL BELOW PRESSURE SUPPLY LINE 7 -PIGTAIL & LOOP CONTROL WIRE & PROVIDE THRUST BLOCKS AT ALL 90 DEGREE CHANGES IN DIRECTION -SPLICING OF WIRE RUN PER SPECS. ONLY -36" MIN. COVER FOR RECLAIMED WATER MAINLINE NOTES 3 328409.76-21 These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263

IRRIGATION
DETAILS L-4.1

Page 410 of 510 ends

RCV WITH UNION S.O.V. 1 1/2" = 1'-0" 12 3 4 6 5 7 9 8 10 WATER PROOF WIRE CONNECTORS ON 18" LOOPED WIRES 1 20x14 JUMBO PLASTIC VALVE BOX AND COVER 2 REMOTE CONTROL VALVE, ONE PER BOX. 3 KBI BTU 'V' THREADED TRUE UNION BALL VALVE WITH SCHEDULE 80 NIPPLES. 4 5 MAIN LINE WITH PVC TEE 6 SCHEDULE 40 RISER 7 TXS PVC 90 ELBOW 1/2" WIRE CLOTH GOPHER SCREEN, WRAP UP ALL SIDES 8 6X2X16 CONC. BLOCK CAPS, ONE EA. CORNER (4 TOTAL) 9 INCREASE LATERAL LINES AS PER PLANS 10 NOTES 1. FOR RECLAIMED WATER SYSTEMS, CONTRACTOR TO USE PURPLE LIDS AND HANDLES 328406.13-04 2 1 1/2" = 1'-0" DRIP FLUSH VALVE SET VALVE BOX 2" ABOVE FINISHED GRADE OF SHRUB AREA.1 2 34 5 6 1 10" DIAMETER VALVE BOX 2 COIL 24" TO 30" OD DRIP TUBING IN THE BOX 3 1/2" DRIP TUBING TO 3/4" FPT ADAPTER 4 3/4" PVC BALL VALVE WITH SHORT NIPPLE 5 1/2" DRIP TUBING 4" THICK LAYER OF WASHED GRAVEL. THE BOX SHALL REST UPON THE ROCK BED. DO NOT EXTEND GRAVEL INTO BOX. 6LEGEND 2" 3 328413.49-03 LATERAL FLOW PER 100 FT (GPM) GRID PRECIPITATION RATES (IN/HR) MAXIMUM LATERAL LENGTH (FEET) DOGBONE SHAPED CORNER SHAPED CURVED POLYGON HOURGLASS SHAPED POLYGON SHAPED "C" SHAPED ODD SHAPED RAIN BIRD DRIPLINE W/ XPANDO INSERT ADAPTER N.T.S. PVC MAINLINE. END FEED EXAMPLE CENTER FEED EXAMPLE TYPICAL OFFSET 2" FROM HARDSCAPE, 4" FROM PLANTED AREA. TYPICAL DRIPLINE WITH EMITTER SPACING AS NOTED. TIE DOWN STAKE AT ALL TEES, ELLS, AND AT 5' O.C. AT CLAY, 4' O.C. AT LOAM, OR 3' O.C. AT SAND. FLUSH VALVE OR CAP AT LOW END, AS FAR FROM THE SUPPLY HEADER AS POSSIBLE. AT CENTER FEED, FLUSH VALVE AT EACH EXHAUST END.

MAXIMUM LENGTH OF SINGLE
LATERAL, SEE CHART. TYPICAL VALVE, FILTER, PRESSURE REGULATOR.

MAXIMUM LENGTH OF SINGLE
LATERAL, SEE CHART. DRIPLINE SPACING AS NOTED. EMITTERS OFFSET FOR TRIANGULAR SPACING. TYPICAL OFFSET 2" FROM HARDSCAPE, 4" FROM PLANTED AREA. TYPICAL 1-1/2" MINIMUM SUPPLY MANIFOLD. DRILL HOLES WITH "XPANDO" INSERT ADAPTERS FOR DRIPLINE AS PER DETAIL: TYPICAL LATERAL PIPE FROM VALVE ASSEMBLY, SIZE AS PER PLANS. SUPPLY MANIFOLD. EXHAUST MANIFOLD. EXHAUST MANIFOLD. SUPPLY MANIFOLD. AIR RELIEF VALVE AT HIGH POINT, AS INDICATED. SLOPED CONDITION NOTE: 1. DRIPLINE LATERALS SHOULD FOLLOW THE CONTOURS OF THE SLOPE WHENEVER POSSIBLE. 2. INSTALL AIR RELIEF VALVE AT HIGHEST POINT. 3. NORMAL SPACING WITHIN THE TOP 2/3 OF SLOPE. 4. INSTALL DRIPLINE AT 25% GREATER SPACING AT BOTTOM 1/3 OF THE SLOPE. 5. WHEN ELEVATION CHANGE IS 10 FT OR MORE, ZONE THE BOTTOM 1/3 ON A SEPARATE VALVE. SUPPLY MANIFOLD. DRILL HOLES WITH INSERT ADAPTERS AS PER DETAIL: 4 FX-IR-RB-DRIP-29 RAINBIRD XCZ-100-PRBR DRIP CONTROL VALVE 1" = 1" 1 328406.13-11 These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263

IRRIGATION
DETAILS L-4.2

Page 411 of 510 ends

LIBRARY AF AF AF WF WF WF WF WFWF AF AF PR PR PR PR PR PR PR PR PR PR PRPR PR PR PRPR PR LC LC LC LC LC LC LC PT PT PT PTPTPT PTPTPT PTPT PT LC LC LC LA LA LC LC LA LA LALA LA LA LA LA LCLC LC LC LC LC LC LCLCLCLC LC LC LCLC LCLC LC LC LC LC LC LC LC LC LC LC LC LCLCLC LC LC LCLCLA PMPMPMPMPMPM PM PM PM PM PM PM PM PM PMPMPMPMPMPMPM SC SC SCSC SCSC SCSC WMWMWM WMWMWMWM SCSC SC SC SC SC SC SC SC SC WMWM WM WM MC MC MC MCMC MC MC MC MC MC MC MC MC MC LS LS LS LS LS LS LS LS LS LSLSLSLSLSLS ERI DIV 19 - 1 gal ERI MUL 1 - 24"box ERI DIV 3 - 1 gal ERI DIV 5 - 1 gal LIBRARY PT LS LS LS ERI DIV 2 - 1 gal TRA ESP 14 - 1 gal ERI DIV 4 - 1 gal ERI DIV 3 - 1 gal ERI DIV 7 - 1 gal ERI DIV 3 - 1 gal ERI DIV 3 - 1 gal WMWMWM SC LCLCLCLC PTPT LCLC PR PRPR SYMBOL BOTANICAL NAME COMMON NAME CONT WUCOLS QTY TREES ERIOBOTRYA DEFLEXA BRONZE LOQUAT MULTI-TRUNK 24"BOX MODERATE 1 SHRUBS ANIGOZANTHOS FLAVIDUS KANGAROO PAW 5 GAL LOW 5 ECHEVERIA X 'BLUE ATOLL' BLUE ATOLL ECHEVERIA 1 GAL LOW 4 FESTUCA GLAUCA 'ELIJAH BLUE' ELIJAH BLUE FESCUE 1 GAL LOW 46 LAVANDULA ANGUSTIFOLIA 'ESSENCE PURPLE' ESSENCE PURPLE ENGLISH LAVENDER 5 GAL LOW 11 LIGUSTRUM SINENSE 'SUNSHINE' SUNSHINE CHINESE PRIVET 5 GAL LOW 18 LOMANDRA LONGIFOLIA 'BREEZE' DWARF MAT RUSH 5 GAL LOW 53 MYRTUS COMMUNIS 'COMPACTA' DWARF COMMON MYRTLE 5 GAL LOW 14 PHORMIUM TENAX 'RAINBOW MAIDEN' NEW ZEALAND FLAX 5 GAL LOW 20 PHORMIUM TENAX 'TOM THUMB' DWARF FLAX 5 GAL LOW 15 PITTOSPORUM TOBIRA 'MOJO' JAPANESE PITTOSPORUM 5 GAL MODERATE 21 SANTOLINA CHAMAECYPARISSUS LAVENDER COTTON 5 GAL LOW 19 WESTRINGIA FRUTICOSA 'MORNING LIGHT' MORNING LIGHT COAST ROSEMARY 5 GAL LOW 14 WESTRINGIA FRUTICOSA 'WES05' MUNDI™ COAST ROSEMARY 5 GAL LOW 6 VINE ESPALIER BIGNONIA CAPREOLATA 'TANGERINE BEAUTY' TANGERINE BEAUTY CROSS VINE 5 GAL MODERATE 10 DISTICTIS BUCCINATORIA BLOOD RED TRUMPET VINE 5 GAL MODERATE 3 FICUS PUMILA CREEPING FIG 5 GAL MODERATE 4 SYMBOL BOTANICAL NAME COMMON NAME CONT WUCOLS SPACING QTY GROUND COVERS ERIGERON KARVINSKIANUS SANTA BARBARA DAISY 1 GAL LOW 30" o.c. 50 TRACHELOSPERMUM JASMINOIDES STAR JASMINE TRELLIS 1 GAL MODERATE 24" o.c. 14 AF LALS LCMCPRPTPMSC WMWF PLANT SCHEDULE These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263
PLANTING PLAN L-5.0 N O R T H 0SCALE: 10 20 30 feet 1" = 10' PLANTING NOTES 1. THE PLANTING PLAN IS DIAGRAMMATIC AND SHALL BE USED AS A GUIDE FOR SETTING OUT PLANTS. PRIOR TO PLANTING, THE LANDSCAPE ARCHITECT SHALL BE CONTACTED TO APPROVE ALL PLANT LOCATIONS AND DIRECT ADJUSTMENTS. 2. PLANT MATERIALS SHALL CONFORM TO NURSERYMAN'S STANDARDS FOR SIZE AND HEALTH. ALL PLANTS ARE SUBJECT TO REJECTION BY THE LANDSCAPE ARCHITECT IF SUBSTANDARD IN SIZE, QUALITY AND HEALTH. PROVIDE WATERPROOF SPECIES IDENTIFICATION TAGS ON ONE PLANT PER SPECIES PER GROUPING. 3. PLANT COUNTS ARE FOR THE CONVENIENCE OF THE LANDSCAPE CONTRACTOR ONLY. CONTRACTOR IS RESPONSIBLE FOR ALL PLANTS SHOWN ON THE PLAN. 4. IRRIGATION SYSTEM SHALL BE FULLY OPERATIONAL AND ALL PLANTING AREAS THOROUGHLY SOAKED PRIOR TO PLANTING. 5. LANDSCAPE CONTRACTOR SHALL MAINTAIN A MINIMUM 2% DRAINAGE AWAY FROM ALL BUILDINGS AND FINISH GRADES SMOOTHED TO ELIMINATE PUDDLING OR STANDING WATER. CONTRACTOR SHALL COORDINATE WITH OTHER TRADES AND MAINTAIN DRAINAGE DURING CONSTRUCTION. FINISH GRADE OF PLANTING AREAS SHALL BE 2" BELOW FINISH SURFACE OF PAVING AND A MINIMUM OF 8" BELOW BUILDING STUCCO SCREED. 6. LANDSCAPE CONTRACTOR SHALL REMOVE ALL EXISTING VEGETATION, TRASH, CLIPPINGS, ROCK AND OTHER DEBRIS IN PLANTING AREAS. RAKE AND FINE GRADE ALL PLANTING AREAS PRIOR TO COMMENCEMENT OF PLANTING OPERATIONS. 7. PLANTING PITS SHALL BE PER PLANTING DETAILS. 8. PLANTING PITS AND PLANTERS SHALL BE BACKFILLED PER SOIL TEST REPORT FOR PLANTING. CONTRACTOR SHALL PROVIDE RESULTS OF AN AGRONOMIC SOILS TEST TO THE OWNER. CONTRACTOR SHALL ADD AMENDMENTS TO THE PLANTING AREAS PER SOILS TESTING RECOMMENDATIONS. 9. STAKE 15 GALLON AND LARGER TREES PER DETAILS. CONTRACTOR SHALL BE RESPONSIBLE FOR TREE STABILITY DURING LENGTH OF THE GUARANTEE PERIOD. 10. VERIFY TREE PIT DRAINAGE WITH 24 HOUR WATER FILL TEST PRIOR TO PLANTING. ALL BOXED TREES NOT DRAINING ARE TO HAVE A 4" DIAMETER AUGER HOLE DRILLED THROUGH ANY HARDPAN OR COMPACTED EARTH AS REQUIRED TO PROVIDE DRAINAGE IN 24 HOUR PERIOD. 11. POST PLANTING FERTILIZATION SHALL BE PERFORMED BY CONTRACTOR AT 30, 60, & 90 DAYS AFTER PLANTING. 12. PLANTS SHALL NOT BE PLACED WITHIN 12" OF SPRINKLER HEADS. 13. SHRUBS AND TREES SHALL BE UNDERPLANTED WITH GROUND COVER AS SHOWN BY ADJACENT SYMBOL. 14. GROUNDCOVER SHALL BE PLANTED USING TRIANGULAR SPACING AS NOTED IN DETAIL UNLESS OTHERWISE NOTED. 15. PROVIDE 3" LAYER OF "WALK-ON BARK" FOR ALL NON-TURF PLANTING AREAS WITH SLOPES LESS STEEP THAN 3:1. PROVIDE SAMPLE TO LANDSCAPE ARCHITECT. BARK TO BE SHREDDED BARK MULCH. 16. VINES SHALL BE SECURED TO ADJACENT FENCES, POSTS OR WALLS USING VINE TIES, UNLESS SHOWN ON TRELLIS. 17. LOCATION OF TREES SHALL CONFORM TO THE REQUIREMENTS OF THE LOCAL JURISDICTION WITH REGARD TO SETBACKS FROM UTILITIES, STREET SIGNAGE AND RIGHT-OF-WAYS. IF TREES ON PLANS ARE IN VIOLATION OF SUCH CODES, CONTRACTOR SHALL INFORM LANDSCAPE ARCHITECT PRIOR TO INSTALLING TREES. 18. LANDSCAPE CONTRACTOR SHALL MAINTAIN ALL PLANTINGS FOR A PERIOD OF NINETY (90) DAYS AFTER FINAL ACCEPTANCE OF THE LANDSCAPE INSTALLATION. ALL AREAS SHALL BE KEPT CLEAN, WATERED AND WEED-FREE. ALL DEAD OR DYING PLANTS THAT ARE WATERED SHALL BE REPLACED WITHIN TWO (2) WEEKS. CONTRACTOR SHALL NOTIFY OWNER IN WRITING WHEN CONTRACTOR IS BEGINNING THE MAINTENANCE PERIOD AND WHAT DATE WILL TERMINATE THE MAINTENANCE PERIOD. 19. CONTRACTOR SHALL GUARANTEE PLANT LONGEVITY AS FOLLOWS: TREES - ONE YEAR; SHRUBS AND GROUNDCOVER - THREE MONTHS. IF MAINTENANCE PERIOD ENDS DURING PERIOD OF PLANT DORMANCY, CONTRACTOR SHALL REPLACE ANY PLANTS THAT DO NOT GROW BACK DURING THE NEXT PLANTING SEASON. 20. WHERE TREE TRUNKS ARE WITHIN 6' OF CURBS, WALLS, SIDEWALKS OR OTHER HARDSCAPE, CONTRACTOR SHALL INSTALL ROOT BARRIER BY 'BIO-BARRIER'. ROOT BARRIERS ARE TO BE LINEAR (24" DEEP MINIMUM) WITH A MINIMUM LENGTH OF 10 FEET PER TREE. LOCATE THE BARRIER AT THE PERIMETER EDGE OF THE PLANTER CENTERED ON THE TREE. 21. CONTRACTOR SHALL PROVIDE THE OWNER WITH AS-BUILT PLANS OF IRRIGATION CLEARLY INDICATING LOCATION OF ALL VALVES, MAINLINES AND MODIFICATIONS TO HEAD LAYOUT. 22. PROVIDE JUTE NETTING TO ALL SLOPES OF 3:1 OR GREATER. 23. PRIOR TO PLANTING, CONTRACTOR SHALL REMOVE ALL WEEDS WITH SYSTEMIC HERBICIDE (ROUND-UP) AND APPLY A PRE-EMERGENT HERBICIDE AFTER PLANTING. 1

Page 412 of 510 ends

VINE PLANTING 1/2" = 1'-0" P-20-SHA-25 4 These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263
PLANTING DETAILS L-5.1 TREE PLANTING WITH STAKING 1/4" = 1'-0" P-20-SHA-22 1 SHRUB PLANTING FROM CONTAINERS 1/2" = 1'-0" 2 P-20-SHA-23 GROUNDCOVER PLANTING 1/4" = 1'-0" NOTES: 1. WHERE PLANTING IS FROM FLATS OR 4" POTS AND MULCH IS REQUIRED, CONTRACTOR SHALL LAY MULCH PRIOR TO PLANTING. 2. IF DRIP IRRIGATION IS USED IN GROUNDCOVER AREA, CONTRACTOR SHALL ADJUST DRIP SYSTEM SO THAT EACH PLANT IS GETTING THE APPROPRIATE AMOUNT OF WATER. P-20-SHA-24 3

Page 413 of 510 ends

LIBRARY SYMBOL CODE DESCRIPTION QTY LOW WATER USE SHRUBS AND GROUNDCOVERS WITH DRIP IRRIGATION 1,777 SF MODERATE WATER USE SHRUBS AND GROUNDCOVERS WITH DRIP IRRIGATION 186 SF MODERATE WATER USE TREES WITH BUBBLERS 7 SF MODERATE WATER USE VINES WITH BUBBLERS 120 SF H-101 H-102 H-103 H-104 HYDROZONES SCHEDULE These designs, drawings and specifications are the property and copyright of the landscape architect and shall not be used in connection with any other work except by agreement with the landscape architect. There shall be no changes or deviation without the consent of the landscape architect. Written dimensions shall be verified on the job site. Any discrepancy shall be brought to the notice of the landscape architect prior to the commencement of any work. 13319 POWAY RD, SUITE 150 P O W A Y , C A 9 2 0 6 4 T E L . 8 5 8 . 5 1 3 . 0 0 3 0 WYNN-SMITH LANDSCAPE ARCHITECTURE INC.

SHAFTER LIBRARY
236 JAMES STREET
SHAFTER, CA 93263
HYDROZONE PLAN L-6.0 N O R T H 0SCALE: 10 20 30 feet 1" = 10' 1

Page 414 of 510 ends

CONSENT CALENDAR

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: June 3, 2025
DEPARTMENT: Randy Milligan, Police Chief
SUBJECT: RADAR/MESSAGING TRAILER FROM FLOCK SAFETY

PURCHASE

RECOMMENDATION
Council find the action is not defined as a “project” per Section 15378(b)(4) of the CEQA Guidelines; approve the purchase of the RADAR messaging trailer from Flock Safety for $30,250.

BACKGROUND
The Shafter Police Department currently does not own a RADAR/messaging trailer.

Previously, the department had a RADAR trailer that was used for several years, but it became non-operational and was never replaced.

The trailer was proven to be a highly effective tool for gathering traffic information to support enforcement efforts, assist with traffic-calming initiatives, address speed complaints in residential neighborhoods, and fulfill citizen requests for additional traffic monitoring.

Speed trailers display the speed of approaching vehicles and serve as effective tools for increasing driver awareness. They are not intended for traffic enforcement but are educational for drivers and can significantly reduce speeds in residential areas and throughout the city.

The Flock Safety Radar Trailer can also display messages, allowing the Police Department to communicate with motorists and pedestrians. By adding a trailer, the Police Department would have the capability to warn the public of traffic hazards or redirect traffic during accidents or events. This feature would enhance traffic, transit, pedestrian, and bicycle safety throughout the city.

The trailers from Flock Safety come prewired for Automated License Plate Reading (LPR) cameras, enabling the Police Department to install an LPR camera on the trailer.

LPR cameras assist the Police Department in crime prevention and serve as investigative tools. The camera can be incorporated with the current Flock system.

The Police Department is requesting approval to purchase the Flock Safety Speed Alert 24 RADAR/Messaging trailer with the Flock LPR bundle. The total cost of the RADAR/Messaging trailer is $30,250.00. This price includes a two-year subscription to

Page 415 of 510 ends

RADAR/MESSAGING TRAILER FROM FLOCK SAFETY PURCHASE
- 2 -
the Flock LPR camera. After two years, an annual recurring cost of $5,000 will be added to our current Flock LPR camera subscription. A quote from Flock Safety is attached for review.

FISCAL IMPACT
If approved by the Council, a budget adjustment will be required to allocate $30,250 from the General Fund, utilizing salary savings from vacant positions.

CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(4) of the CEQA Guidelines because the action is the approval of speed alert radar message sign therefore, it is the creation of a governmental funding mechanism or other fiscal activity that does not involve any commitment to a specific project that can result in a potentially significant impact and not subject to CEQA.

APPROVED BY THE CITY ATTORNEY
Not Applicable

ATTACHMENTS

1. Shafter PD x Flock- trailer purchase, camera lease quote

Page 416 of 510 ends

Flock Safety + CA - Shafter PD
______________
Flock Group Inc.
1170 Howell Mill Rd, Suite 210
Atlanta, GA 30318
______________
MAIN CONTACT:

Caroline Fraher
[email protected]
3108443659
Created Date: 05/22/2025
Expiration Date: 06/20/2025
Quote Number: Q-142399
PO Number:

Page 417 of 510 ends

Budgetary Quote
This document is for informational purposes only. Pricing is subject to change.

Bill To: 201 Central Valley Hwy Shafter, California 93263 Ship To: 201 Central Valley Hwy Shafter, California 93263 Billing Company Name: CA - Shafter PD Subscription Term: 24 Months Billing Contact Name: Payment Terms: Net 30
Billing Email Address: Retention Period: 30 Days
Billing Phone: Billing Frequency: Annual Plan - First Year Invoiced at Signing.

Hardware and Software Products
Annual recurring amounts over subscription term
Item Cost Quantity Total
Flock Safety Platform $5,000.00
Flock Safety Bundles
LPR Trailer Bundle - Purchase Included 1 Included
Flock Safety LPR Products
LPR Camera - For Approved Trailers Included 1 Included
Professional Services and One Time Purchases
Item Cost Quantity Total
One Time Fees
Flock Safety Professional Services
Trailer - ATS-5 with SpeedAlert 24 Radar
Speed and Message Sign - Purchase $18,750.00
Trailer Delivery $1,500.00
Subtotal Year 1: $25,250.00
Annual Recurring Subtotal: $5,000.00
Estimated Tax: $1,359.38
Contract Total: $30,250.00
Taxes shown above are provided as an estimate. Actual taxes are the responsibility of the Customer. This is not an invoice – this document is a non-binding proposal for informational purposes only. Pricing is subject to change.

Page 418 of 510 ends

Billing Schedule Amount (USD)
Year 1
At Contract Signing $25,250.00
Annual Recurring after Year 1 $5,000.00
Contract Total $30,250.00
*Tax not included

Page 419 of 510 ends

Product and Services Description
FlockOS Features Description
LPR Trailer Bundle - Purchase
Trailer - ATS-5 with SpeedAlert 24 Radar Speed and Message Sign - Purchase
ATS-5 trailer with 120W solar, 47Ah batteries, and equipped with SpeedAlert 24 radar message sign
LPR Camera - For Approved Trailers Preconfigured LPR camera for use on approved trailers Trailer Delivery Delivery of trailer to customer site
FlockOS Features & Description
FlockOS Features Description

Page 420 of 510 ends

CONSENT CALENDAR

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: June 3, 2025
DEPARTMENT: Rogelio Sanchez, Finance Director
SUBJECT: FEDERAL FUNDING UNDER FTA SECTION 5311 (49 U.S.C.

SECTION 5311) WITH THE CALIFORNIA DEPARTMENT OF

TRANSPORTATION APPLICATION AUTHORIZATION

RECOMMENDATION
Council find the action is not defined as a “project” per Section 15378(b)(4) of the CEQA Guidelines; adopt Resolution 3020, a Resolution of the City Council of the City of Shafter, California, Authorizing the Federal Funding Under FTA Section 5311 (49 U.S.C. Section 5311) with the California Department of Transportation for Fiscal Year 2025-2026

BACKGROUND
The City annually files an application for federal assistance to fund a portion of the operation of our transit system. The City updated the resolution that establishes who is authorized to execute and file Section 5311 grant applications and assurances, who is authorized to furnish additional information as the Department of Transportation may require, who is authorized to execute affirmative and minority business policies, and who is authorized to execute the grant award. Securing of 5311 grant funds will fund a portion of the Transit Operations for Fiscal Year (FY) 2025-2026.

FISCAL IMPACT
These funds are annually budgeted, and this funding source assists in the delivery of transit services in the community. KernCOG is the lead agency for administering FTA 5311 grant funds to all Cities in the county and does so through the adoption of a Program of Projects (POP). The Fiscal Year 2025-2026 allocation to the City of Shafter is estimated to be $137,843.

CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(4) of the CEQA Guidelines because the action is the approval of a resolution authorizing application for federal funding with the California Department of Transportation and therefore, it is the creation of a governmental funding mechanism or other fiscal activity that does not involve any commitment to a specific project that can result in a potentially significant impact and not subject to CEQA.

APPROVED BY THE CITY ATTORNEY
No

Page 421 of 510 ends

FEDERAL FUNDING UNDER FTA SECTION 5311 (49 U.S.C. SECTION 5311) WITH THE

CALIFORNIA DEPARTMENT OF TRANSPORTATION APPLICATION AUTHORIZATION - 2 -

ATTACHMENTS

1. Resolution 3020 Federal Transportation Act 5311 Funding FY 25/26

Page 422 of 510 ends

RESOLUTION NO. 3020

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHAFTER,

CALIFORNIA, AUTHORIZING THE FEDERAL FUNDING UNDER FTA
SECTION 5311 (49 U.S.C. SECTION 5311) WITH THE CALIFORNIA

DEPARTMENT OF TRANSPORTATION
WHEREAS, the U.S. Department of Transportation is authorized to make grants to states through the Federal Transit Administration to support capital/operating assistance projects for non­ urbanized public transportation systems under Section 5311 of the Federal Transit Act (FTA C 9040.IF and FTA C 9050.1); and
WHEREAS, the California Department of Transportation (Department) has been designated by the Governor of the State of California to administer Section 5311 grants for transportation projects for the general public for the rural transit and intercity bus; and WHEREAS, the City of Shafter desires to apply for said financial assistance to permit operation of service/purchase of capital equipment in Kern County; and WHEREAS, the City of Shafter has, to the maximum extent feasible, coordinated with other transportation providers and users in the region (including social service agencies).

NOW, THEREFORE, BE IT RESOLVED, DETERMINED AND
ORDERED by the City Council of the City of Shafter, California, that the City Manager and Administrative Services Director of the City of Shafter is hereby authorized to:

Section 1. Execute and file applications on behalf of the City of Shafter with the Department to aid in the financing of capital/operating assistance projects pursuant to Section 5311 of the Federal Transit Act (FTA C 9040.IF and FTA 9050.1), as amended, Section 2. Execute and file all certification of assurances, contracts or agreements or any other document required by the Department.

Section 3. Provide additional information as the Department may require in connection with the application for the Section 5311 projects.

Section 4. Submit and approve request for reimbursement of funds from the Department for the Section 5311 project(s).

Page 423 of 510 ends

PASSED, APPROVED AND ADOPTED ON THIS 3
rd DAY OF JUNE, 2025.
_________________________________
Chad Givens, Mayor
ATTEST:
_________________________________
Yazmina Pallares, City Clerk
APPROVED AS TO FORM:
_________________________________
Marco A. Martinez, City Attorney

Page 424 of 510 ends

CONSENT CALENDAR

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: June 3, 2025
DEPARTMENT: Rachel Zermeno, Community Engagement Manager SUBJECT: SOCIAL MEDIA RELATIONS ASSISTANT POSITION TO FULLTIME APPROVAL

RECOMMENDATION
Council find the action is exempt from the California Environmental Quality Act (CEQA) because it is not defined as a "project" per Section 15378(b)(4) of the CEQA Guidelines; and authorize the City Manager to convert the Social Media Relations Assistant Position to Full-Time within the Community Engagement Department.

BACKGROUND
The Community Engagement Department currently operates with a lean staffing structure consisting of one full-time employee and one part-time Social Media Relations Assistant. As the City of Shafter expands, the demand for timely, accurate, and effective communication with residents, businesses, and stakeholders has grown significantly.

Recently, the department assumed full responsibility for managing the social media accounts of both the Shafter Police Department and Animal Control. This transition has allowed public safety personnel to focus more directly on core operations; however, it has also substantially increased the workload of the communications team. We have seen a substantial increase in reach, over 100%, and gained more than 1,800 followers on Facebook and Instagram combined.

Shafter remains one of the fastest-growing communities in California. This growth has added complexity to City operations, particularly in community engagement, public transparency, and strategic communications, making robust and proactive communication efforts more critical than ever.

In May 2024, the City hired a part-time Social Media Relations Assistant position to help meet increasing communication demands. Over the past year, the position has averaged 103.5 hours per month, making it eligible for CalPERS retirement and health benefits. Given this, Staff recommends transitioning this role from part-time to full-time.

While the position will formally become full-time and eligible for associated benefits, it will maintain a regular schedule of 30 hours per week, with the flexibility to increase to 40 hours per week during peak periods or special project needs.

This adjustment ensures compliance with benefits eligibility requirements with minimal

Page 425 of 510 ends

SOCIAL MEDIA RELATIONS ASSISTANT POSITION TO FULL-TIME APPROVAL - 2 -
impact on the General Fund, supports the operational needs of the Community Engagement Department, and reinforces the City's ongoing commitment to responsive and effective communication with the public.

FISCAL IMPACT
Transitioning the Social Media Relations Assistant position from part-time to full-time will result in an estimated annual cost of $110,543, inclusive of salary and benefits. This increase will impact the General Fund beginning in FY 2025-26. No budget adjustment is required for the current fiscal year (FY 2024-25).

CEQA ANALYSIS
The action is exempt from the California Environmental Quality Act (CEQA) because it is not defined as a "project" per Section 15378(b)(4) of the CEQA Guidelines. The action is a government fiscal activity that does not involve any commitment to any specific project that may result in a potentially significant impact on the environment.

APPROVED BY THE CITY ATTORNEY
Not Applicable

ATTACHMENTS
None

Page 426 of 510 ends

CONSENT CALENDAR

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: June 3, 2025
DEPARTMENT: Yazmina Pallares, City Clerk
SUBJECT: REGULAR CITY COUNCIL MEETING OF JULY 1, 2025

CANCELLATION

RECOMMENDATION
Council find the action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines; approve the cancellation of the regularly scheduled City Council meeting of July 1, 2025.

BACKGROUND
It is common practice of cities to cancel one regularly scheduled City Council meeting during the summertime. This time of year is typically considered to not be as busy mainly due to several factors: usually the annual city budget has been adopted; City Council and City Staff may have planned summer vacations with family; and our counterparts at the local, regional and State level also tend to be out of the office. To this end, Staff is proposing the cancelation of the regular City Council meeting of July 1, 2025.

Currently, there are no business matters that require immediate action by the City Council at that meeting. A special meeting can be scheduled should business matters requiring immediate attention arise prior to the next regular Council meeting on Tuesday, July 15, 2025.

FISCAL IMPACT
None.

CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines because the action is the cancellation of a regularly scheduled City Council meeting and therefore, it is organizational and administrative activity that will not result in direct or indirect physical changes to the environment and not subject to CEQA.

APPROVED BY THE CITY ATTORNEY
Not Applicable

ATTACHMENTS
None

Page 427 of 510 ends

CONSENT CALENDAR

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: June 3, 2025
DEPARTMENT: Carol Chavolla, HR Director
SUBJECT: CITY OF SHAFTER EMPLOYEE BI-WEEKLY PAY SCHEDULE, EFFECTIVE MAY 6, 2025

RECOMMENDATION
Council find action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines; and adopt the City of Shafter Employee Bi-Weekly Pay Schedule, effective May 6, 2025.

BACKGROUND
The City of Shafter Employee Bi-Weekly Pay Schedule has been revised to reflect the addition of the Deputy Finance Director position authorized by the City Council on May 6, 2025, and the removal of the Utility Billing Clerk (PT/Extra Help) position. The revisions to the Shafter Employee Bi-weekly Pay Schedule are as follows:

Position Range Bi-Weekly
Pay
Action
Finance Director,
Deputy
NR-NS
347
$5,806 -
$7,058
Add Position
Utility Billing Clerk

PT/EH TI
Hourly $23.50 Remove Position
Utility Billing Clerk

PT/EH TII
Hourly $25.33 Remove Position
Pursuant to California Code of Regulations (CCR) Section 570.5, CalPERS requires that a pay schedule be adopted by the City Council to formally authorize the employee pay rates and earnable reportable compensation. For City Council adoption, enclosed is the revised City of Shafter Employee Bi-Weekly Pay Schedule effective May 6, 2025.

FISCAL IMPACT
The revisions are within the approved Fiscal Year 2024/2025 Annual Operating Budget. A budget amendment is not required.

CEQA ANALYSIS

Page 428 of 510 ends

CITY OF SHAFTER EMPLOYEE BI-WEEKLY PAY SCHEDULE, EFFECTIVE MAY 6, 2025 - 2 -
The action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines because the action is the approval of a pay schedule, and therefore, it is an organizational and administrative activity that will not result in direct or indirect physical changes to the environment and not subject to CEQA.

APPROVED BY THE CITY ATTORNEY
No

ATTACHMENTS

1. Bi-Weekly Pay Schedule Effective 2025 05 06

Page 429 of 510 ends

TITLE SALARY GRID RANGE ABCDE
Accounting Manager NR-NS 306 4,766 $ 5,005 $ 5,255 $ 5,518 $ 5,793 $ Accounting Supervisor NR-NS 261 3,844 $ 4,037 $ 4,238 $ 4,450 $ 4,673 $ Accounting Technician I NR-NS 146 2,246 $ 2,358 $ 2,476 $ 2,600 $ 2,730 $ Accounting Technician II NR-NS 178 2,603 $ 2,733 $ 2,870 $ 3,013 $ 3,164 $ Accounting Technician III NR-NS 210 3,022 $ 3,174 $ 3,332 $ 3,499 $ 3,674 $ Administrative Analyst I NR-NS 209 3,008 $ 3,159 $ 3,317 $ 3,483 $ 3,657 $ Administrative Analyst II NR-NS 261 3,844 $ 4,037 $ 4,238 $ 4,450 $ 4,673 $ Administrative Assistant I NR-NS 147 2,256 $ 2,369 $ 2,488 $ 2,612 $ 2,742 $ Administrative Assistant II NR-NS 179 2,615 $ 2,746 $ 2,883 $ 3,027 $ 3,179 $ Administrative Assistant (PT/Extra Help) Tier I NR-NS Hourly 26.17 $ Administrative Assistant (PT/Extra Help) Tier II NR-NS Hourly 28.19 $ Animal Control Manager SPOA-NS 212 3,022 $ 3,174 $ 3,332 $ 3,499 $ 3,674 $ Animal Control Officer SPOA-NS 155 2,319 $ 2,435 $ 2,557 $ 2,685 $ 2,819 $ Animal Control Services Worker NR-NS 70 1,595 $ 1,675 $ 1,759 $ 1,847 $ 1,939 $ Building Inspector I NR-NS 232 3,351 $ 3,519 $ 3,695 $ 3,880 $ 4,074 $ Building Inspector II NR-NS 253 3,701 $ 3,886 $ 4,080 $ 4,284 $ 4,498 $ Building Inspector Manager NR-NS 306 4,766 $ 5,005 $ 5,255 $ 5,518 $ 5,793 $ Building Official, Chief DIR 384 6,763 $ 7,102 $ 7,457 $ 7,830 $ 8,221 $ City Clerk NR-NS 306 4,766 $ 5,005 $ 5,255 $ 5,518 $ 5,793 $ City Clerk, Deputy NR-NS 209 3,008 $ 3,159 $ 3,317 $ 3,483 $ 3,657 $ City Engineer NR-NS 365 6,334 $ 6,651 $ 6,984 $ 7,333 $ 7,700 $ City Manager Contract 8,077 $
Code Enforcement Officer I NR-NS 183 2,664 $ 2,797 $ 2,937 $ 3,084 $ 3,238 $ Code Enforcement Officer II NR-NS 215 3,094 $ 3,249 $ 3,411 $ 3,582 $ 3,761 $ Community Engagement Manager NR-NS 306 4,766 $ 5,005 $ 5,255 $ 5,518 $ 5,793 $ Community Service Officer (PT) - Tier I Hourly 28.96 $
Community Service Officer (PT) - Tier II Hourly 31.21 $ Community Services Assistant I (PT) - Tier I Hourly 23.92 $ Community Services Assistant I (PT) - Tier II Hourly 25.77 $ Community Services Assistant II (PT) - Tier I Hourly 27.20 $ Community Services Assistant II (PT) - Tier II Hourly 29.30 $ Community Services Director DIR 384 6,763 $ 7,102 $ 7,457 $ 7,830 $ 8,221 $ Community Services Supervisor NR-NS 261 3,844 $ 4,037 $ 4,238 $ 4,450 $ 4,673 $ Economic Development Coordinator NR-NS 277 4,149 $ 4,356 $ 4,574 $ 4,803 $ 5,043 $ Economic Development Director DIR 384 6,763 $ 7,102 $ 7,457 $ 7,830 $ 8,221 $ Engineer I NR-NS 232 3,351 $ 3,519 $ 3,695 $ 3,880 $ 4,074 $ Engineer II NR-NS 263 3,881 $ 4,075 $ 4,278 $ 4,492 $ 4,717 $ Engineer III, Civil NR-NS 294 4,500 $ 4,725 $ 4,961 $ 5,209 $ 5,470 $ Equipment Operator SEIU 137 2,299 $ 2,414 $ 2,534 $ 2,661 $ 2,794 $ Executive Assistant NR-NS 221 3,182 $ 3,341 $ 3,508 $ 3,683 $ 3,867 $ Facilities Supervisor NR-NS 261 3,844 $ 4,037 $ 4,238 $ 4,450 $ 4,673 $ Finance Analyst I NR-NS 209 3,008 $ 3,159 $ 3,317 $ 3,483 $ 3,657 $ Finance Analyst II NR-NS 261 3,844 $ 4,037 $ 4,238 $ 4,450 $ 4,673 $ Finance Director DIR 384 6,763 $ 7,102 $ 7,457 $ 7,830 $ 8,221 $ Finance Director, Deputy NR-NS 347 5,806 $ 6,097 $ 6,402 $ 6,722 $ 7,058 $ GIS Specialist I NR-NS 186 2,701 $ 2,836 $ 2,978 $ 3,127 $ 3,283 $ GIS Specialist II NR-NS 207 2,980 $ 3,129 $ 3,286 $ 3,450 $ 3,623 $ Human Resources Coordinator NR-NS 261 3,844 $ 4,037 $ 4,238 $ 4,450 $ 4,673 $ Human Resources Director DIR 384 6,763 $ 7,102 $ 7,457 $ 7,830 $ 8,221 $ CITY OF SHAFTER EMPLOYEE BIWEEKLY PAY SCHEDULE (Effective 5/6/25 - Revised 5/7/25 - Adopted 6/3/25 )

Page 430 of 510 ends

TITLE SALARY GRID RANGE ABCDE
CITY OF SHAFTER EMPLOYEE BIWEEKLY PAY SCHEDULE (Effective 5/6/25 - Revised 5/7/25 - Adopted 6/3/25 ) Information Technology Analyst NR-NS 265 3,918 $ 4,114 $ 4,320 $ 4,536 $ 4,762 $ Information Technology Director DIR 384 6,763 $ 7,102 $ 7,457 $ 7,830 $ 8,221 $ Information Technology Manager NR-NS 306 4,766 $ 5,005 $ 5,255 $ 5,518 $ 5,793 $ Information Technology Specialist I NR-NS 199 2,871 $ 3,014 $ 3,165 $ 3,323 $ 3,490 $ Information Technology Specialist II NR-NS 238 3,447 $ 3,620 $ 3,801 $ 3,991 $ 4,190 $ Intern - Tier I Hourly 16.50 $
Intern - Tier II Hourly 17.78 $
Mechanic SEIU 157 2,519 $ 2,645 $ 2,777 $ 2,916 $ 3,062 $ Permit Technician NR-NS 183 2,664 $ 2,797 $ 2,937 $ 3,084 $ 3,238 $ Planner, Associate NR-NS 205 2,952 $ 3,100 $ 3,255 $ 3,418 $ 3,588 $ Planner, Senior NR-NS 281 4,228 $ 4,440 $ 4,662 $ 4,895 $ 5,140 $ Planning Director DIR 384 6,763 $ 7,102 $ 7,457 $ 7,830 $ 8,221 $ Police Chief DIR 384 6,763 $ 7,102 $ 7,457 $ 7,830 $ 8,221 $ Police Dispatch Supervisor NR-NS 228 3,288 $ 3,453 $ 3,625 $ 3,807 $ 3,997 $ Police Dispatcher SPOA-NS 154 2,309 $ 2,424 $ 2,546 $ 2,673 $ 2,807 $ Police Lieutenant NR-S 306 5,032 $ 5,283 $ 5,547 $ 5,825 $ 6,116 $ Police Officer SPOA-S 205 3,145 $ 3,303 $ 3,468 $ 3,641 $ 3,823 $ Police Officer, Senior SPOA-S 226 3,471 $ 3,645 $ 3,827 $ 4,018 $ 4,219 $ Police Officer Trainee - Tier I Hourly 26.52 $
Police Officer Trainee - Tier II Hourly 28.58 $
Police Records Supervisor NR-NS 228 3,288 $ 3,453 $ 3,625 $ 3,807 $ 3,997 $ Police Records Technician NR-NS 163 2,429 $ 2,550 $ 2,678 $ 2,812 $ 2,952 $ Police Property & Evidence Supervisor NR-NS 228 3,288 $ 3,453 $ 3,625 $ 3,807 $ 3,997 $ Police Property & Evidence Technician NR-NS 163 2,429 $ 2,550 $ 2,678 $ 2,812 $ 2,952 $ Police Sergeant SPOA-S 262 4,116 $ 4,321 $ 4,537 $ 4,764 $ 5,003 $ Public Facilities Supervisor NR-NS 261 3,844 $ 4,037 $ 4,238 $ 4,450 $ 4,673 $ Public Works Director DIR 384 6,763 $ 7,102 $ 7,457 $ 7,830 $ 8,221 $ Public Works Director, Deputy NR-NS 363 6,274 $ 6,587 $ 6,917 $ 7,262 $ 7,626 $ Public Works Inspector NR-NS 208 2,994 $ 3,144 $ 3,301 $ 3,466 $ 3,640 $ Risk Management Coordinator NR-NS 261 3,844 $ 4,037 $ 4,238 $ 4,450 $ 4,673 $ Service Crew Member I SEIU 106 1,996 $ 2,096 $ 2,201 $ 2,311 $ 2,427 $ Service Crew Member II SEIU 140 2,331 $ 2,447 $ 2,569 $ 2,698 $ 2,833 $ Service Crew Member, Senior SEIU 172 2,700 $ 2,835 $ 2,977 $ 3,126 $ 3,282 $ Social Media Relations Assistant (PT/Extra Help) - Tier I NR-NS Hourly 28.19 $ Social Media Relations Assistant (PT/Extra Help) - Tier II NR-NS Hourly 30.38 $ Streets Supervisor NR-NS 261 3,844 $ 4,037 $ 4,238 $ 4,450 $ 4,673 $ Teacher (PT) - Tier I Hourly 41.28 $
Teacher (PT) - Tier II Hourly 44.48 $
Transit Driver (FT) NR-NS 108 1,889 $ 1,984 $ 2,083 $ 2,187 $ 2,296 $ Transit Driver (PT) - Tier I Hourly 21.92 $
Tranist Driver (PT) - Tier II Hourly 23.62 $
Transit Driver, Lead NR-NS 146 2,246 $ 2,358 $ 2,476 $ 2,600 $ 2,730 $ Utilities Manager NR-NS 306 4,766 $ 5,005 $ 5,255 $ 5,518 $ 5,793 $ Utility Operator I SEIU 140 2,331 $ 2,447 $ 2,569 $ 2,698 $ 2,833 $ Utility Operator II SEIU 173 2,713 $ 2,848 $ 2,991 $ 3,140 $ 3,297 $ Utility Technician SEIU 205 3,149 $ 3,306 $ 3,471 $ 3,645 $ 3,827 $ The numbers on this schedule are rounded to the nearest dollar and may vary slightly from actual payroll calculations due to rounding.

Page 431 of 510 ends

FULL-TIME PART-TIME
Spanish 5% $55.39 $55.39
Prorate per hour =
$1,440 Annual
Student +60 Units 2.5%
Associate Degree 2.5%
Bachelor Degree 5%
POST Intermediate 5% 5%
POST Advanced 5% 5%
POST Supervisor 2.5% 2.5%
Arborist (ISA Arborist) 2.5% 2.5%
Arborist (Tree Risk Assess.) 0.5% 0.5%
Arborist (Muni Spec.) 0.5% 0.5%
ASE (G1 and A1-A8 Master) 2.5% 2.5%
ASE (Medium/Heavy Truck) 1.0% 1.0%
ASE (Transit Bus Master) 1.0% 1.0%
Water (Distribution or Treatment) D1/T1 None None
Water (Distribution or Treatment) D2/T2 2.5% 2.5%
Water (Distribution or Treatment) D3/T3 1.5% 1.5%
Water (Distribution or Treatment) D4 1.0% 1.0%
Other Up to 5%
3 Years 2.5%
5 Years 2.5% 2.5%
7 Years 2.5%
10 Years 2.5% 2.5%
12 Years 2%
15 Years 2.5% 2.5%
16 Years 2%
20 Years 1% 2.5% 2.5%
Canine 2.5%
Detective Division Premium 3.5%
Traffic Detail 3.5%
Shift Differential - Sworn (7 p.m. - 7 a.m.) $1.50/hr
Shift Differential - Dispatch (6 p.m. - 6 a.m.) $1.50/hr Longevity
Special Assignment
Bilingual
Education Incentive (5% Maximum)
Certificates
CITY OF SHAFTER EMPLOYEE BIWEEKLY PAY SCHEDULE (Effective 5/6/25 - Revised 5/7/25 - Adopted 6/3/25 )

PREMIUM PAY FLAT AMOUNT AND/OR PERCENTAGE OF BASE BIWEEKLY AMOUNT

INCENTIVE

SHAFTER POLICE

OFFICER ASSOCIATION

SEIU PUBLIC WORKS
UNIT

NONREPRESENTED EMPLOYEES

Page 432 of 510 ends

PUBLIC HEARINGS

CITY OF SHAFTER

CITY COUNCIL REPORT
MEETING DATE: June 3, 2025
DEPARTMENT: Alan Cazares, Associate Planner
SUBJECT: TENTATIVE TRACT MAP NO. 7463

RECOMMENDATION
City Council find the action already complied with the California Environmental Quality Act; approve Tentative Tract No. 7463, proposing to subdivide 181.44 gross acres into 578 lots, subject to the recommended conditions of approval.

BACKGROUND
Lennar Homes, on behalf of the property owner, Millrose Properties California, is requesting approval of a Tentative Tract Map to subdivide approximately 181.44 gross acres into 578 total lots. This will include 548 single-family residences, three public parks, two drainage basins, a water well site, and 24 public landscape lots. The residential lots range in size from 5,000 square feet to 13,000 square feet.

At this time, the applicant is merely applying for a map approval as part of the entitlement process. Further design and development of the proposed tract will undergo additional review and permitting processes.

ANALYSIS
The project site is located on the southeastern edge of the City, north of Seventh Standard Road and within the Mission Lakes Specific Plan. Mission Lakes is envisioned as a master planned community containing a maximum of 5,334 dwelling units at full build-out; a major commercial center; locations for an elementary and middle school; public recreation facilities; an extensive system of landscaped public walkways; and parks.

This particular tract is located in the center of Mission Lakes. The future Mission Lakes Boulevard wraps around most of the tract, but Pueblo Street serves as the western boundary. In relation to the other Mission Lakes tracts that have been considered by the Commission so far, this tract is north of Tract 7461 and west of Tract 7462. This is the tract that will feature the proposed central lakes within the 43-acre recreational site.

This is the third residential tract application that the City has received for the Mission Lakes Specific Plan area. Tentative Tract Map 7461 was approved by the Shafter City Council in January 2025, allowing for the future development of 281 single-family residences. Tentative Tract Map 7462 was approved by Council in April 2025, allowing

Page 433 of 510 ends

TENTATIVE TRACT MAP NO. 7463
- 2 -
for future development of 836 single-family residential lots. If 7463 is approved by Council, there will be entitlements for 1,665 future single-family homes in the Mission Lakes Specific Plan area.

A variety of floor plans will be provided that will appeal to a wide range of future home buyers, responding to both local and regional housing needs. As the City entitles and permits more housing units, the City makes progress in meeting the 6th Cycle Regional Housing Needs Assessment (RHNA) as identified in the City of Shafter’s 2023-2031 Housing Element Update. Under the RHNA process, the City is assigned its “fair share” of new housing units to build in order to plan for the housing needs of its residents across all income levels, plan for projected growth, and help alleviate California’s housing shortage.

Tract 7463 will also contain two new public parks and a 43-acre recreation site, the latter will include the central lake(s). There will be an extensive system of landscaped walkways, primary paseos, and secondary paseos within the tract designed to enhance walkability, increase connectivity throughout the specific plan area, and promote healthy living.

The tract is located two miles east of the Wonderful Industrial Park, one of Shafter’s major employment hubs, which places housing in close proximity to work. Proximity between jobs and housing can help reduce the region’s vehicle miles traveled and contribute to emission reduction goals. As housing production increases within Shafter, commercial real estate groups may be incentivized to invest in the community and foster projects that will boost the local economy and quality of life.

Around Tract 7463, Mission Lakes Boulevard will be developed as an arterial street with four travel lanes, two auxiliary/bike lanes, a landscaped median, and a primary paseo on one side of the street. Pueblo Street is defined as a minor collector with a parking lane and travel lane on each side, a turn lane down the middle, and a primary paseo on one side of the street. Pedregoza Street will also be a minor collector but will have a secondary paseo on one side of the street instead of the primary paseo. This will serve as a main access point to the 40-acre recreational site. Secondary paseos along the internal streets and multiple landscape lots with walkways will be distributed throughout the tract. These will provide future residents with a variety of walking paths from the home to the multiple public parks and recreation site. Immediately across Pueblo Street, adjacent to the southwest tract boundary, a 15-acre elementary school will be located in the future.

PROJECT REVIEW
The standards and procedures for review and approval of a tentative tract map are generally governed by the California Subdivision Map Act and Title 16 of the Shafter Municipal Code, which is our local Subdivision Ordinance. The proposed tentative tract map has been designed to be consistent with the design elements, development standards, and housing unit capacity required by the Mission Lakes Specific Plan.

Page 434 of 510 ends

TENTATIVE TRACT MAP NO. 7463
- 3 -
The proposed subdivision project was reviewed by the Planning, Building, Public Works, and Engineering Departments of the City of Shafter. To the best of staff’s combined knowledge, the proposed project satisfies all applicable local and state ordinances and regulations at this stage of the development process. Moreover, staff have compiled a list of conditions of approval (as shown in Exhibit “B” of Resolution No. 3019) that reflect additional necessary requirements and rules that the project proponent will have to satisfy and comply with in the ongoing design and development of this tract. More thorough analysis and project review occur at future steps of the entitlement, permitting, and construction phases.

Affected public agencies and service providers were given an opportunity to review the map, provide comments, and propose conditions of approval prior to the Planning Commission hearing. As required by law, public noticing was also provided to any parties within 300 feet of the project boundaries, and a public hearing notice was published on the local press within the required timeline.

MISSION LAKES SPECIFIC PLAN CONSISTENCY
The proposed residential project is consistent with the adopted Mission Lakes Specific Plan and the lot size, configuration, and density meet the requirements for Planning Areas 5, 6, and 10, as identified in the Specific Plan. The circulation plan, street configuration, trails, parks, landscaping, and proposed improvements are all consistent with the Mission Lakes Specific Plan and approved amendments.

MINERAL RIGHTS
Atlantic Richfield Company (ARCO) owns 100% of the mineral rights underlying the project site. As required by state law, ARCO is identified on the tentative tract map as the mineral rights owner. To date, ARCO has not provided comments on the map.

PUBLIC COMMENTS
To date, no public comments on the project have been received. No public comments were received at the May 13th Planning Commission public hearing either when this map was presented.

PLANNING COMMISSION REVIEW AND RECOMMENDATION
The Planning Commission considered the tentative tract map on May 13, 2025. The Planning Commission unanimously approved of and adopted Resolution No. 25-459, recommending the City Council approve the tentative tract map (Tentative Tract No. 7463) subject to the recommended conditions of approval.

FINDINGS

Page 435 of 510 ends

TENTATIVE TRACT MAP NO. 7463
- 4 -

1. The City Council finds that Tentative Tract No. 7463, with the Conditions of Approval, is consistent with the Shafter General Plan and the Mission Lakes Specific Plan.

2. The City Council finds the proposed subdivision is in substantial conformity with the Subdivision Map Act and with Title 16 (Subdivision Ordinance) of the Shafter Municipal Code. The proposed lots are in substantial conformance with the provisions of City Ordinances and all lots will have adequate access to public streets, water lines, fire hydrants, drainage facilities, and utilities.

3. The project’s uses and design are compatible with projects adjacent to the Mission Lakes Specific Plan.

4. The project contributes to the design qualities expected under the Mission Lakes Specific Plan.

5. The project has demonstrated compliance with the policies of the City of Shafter 2005 General Plan.

6. The attached Conditions of Approval are deemed necessary for the safety and welfare of the community and to ensure reasonable surface access is provided for oil and gas exploration and production within the Mission Lakes Specific Plan.

7. The project is exempt from the California Environmental Quality Act, i.e., exempt from the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code, pursuant to California Government Code §65457.

ALTERNATIVES

1. Disapprove the tentative map. Government Code §66474 of the Subdivision Map Act specifies that the Council may only deny the tentative map if it can be found that the map design or improvements are inconsistent with the General Plan, the type or density of development are physically unsuitable for the site, it is likely that the development will cause environmental damage, it is likely that the development will cause serious public health problems, or that the design will conflict with public easements. None of the required findings for denial apply to the proposed map. STAFF DOES NOT RECOMMEND THIS OPTION.

2. Delay approval of the tentative map. The City Council is required by Government Code §66452.2 to take action on the tentative map within 30 days of the filing of the recommendation from the Planning Commission. The Planning Commission recommended approval of the tentative map on May 13, 2025, so final action by the Council is needed before June 12, 2025. Since there are no other City Council meetings scheduled before the aforementioned date, Council should not delay the map any further. STAFF DOES NOT RECOMMEND THIS OPTION.

3. Take no action on the tentative map. If the City Council takes no action on the map prior to June 12, 2025, Government Code §66452.4 stipulates that the map is automatically deemed approved. STAFF DOES NOT RECOMMEND THIS OPTION.

FISCAL IMPACT

Page 436 of 510 ends

TENTATIVE TRACT MAP NO. 7463
- 5 -
There is no fiscal impact directly resulting from the approval of the tentative tract map.

Indirectly, the approval may expedite the development of the residential project. Development of residential projects typically result in increased one-time building related revenues and annual property tax revenues. These revenues are generally offset by the increased ongoing costs of providing services to the newly developed properties.

CEQA ANALYSIS
The proposed tentative tract map includes residential development consistent with the adopted Mission Lakes Specific Plan. Therefore, the project is exempt from the California Environmental Quality Act, i.e., exempt from the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code, pursuant to California Government Code §65457. The project is within the scope of the Program Environmental Impact Report (EIR) that was certified for the Mission Lakes Specific Plan in 2005 (SCH No. 2004101029). The certified Program EIR adequately describes the activity of the residential development proposed in Tentative Tract No. 7463 as adopted in the Mission Lakes Specific Plan.

APPROVED BY THE CITY ATTORNEY
Not Applicable

ATTACHMENTS

1. Vicinity Map

2. Resolution No. 3019

3. Exhibit "A" of Resolution No. 3019

4. Exhibit "B" of Resolution No. 3019

Page 437 of 510 ends

ACRE
CT
BIRD
CT
DUSTY

CT FIELDS
WAY
RAVEN
WAY
CANYON
CT
MYSTIC
WAY

HOMESTEAD
WAY

BLAZING
WAY
BAN
J
O
WAY

BAILEY ST

BAREBACK AVE

WINDSONG
AVE

PAMPLONA
LN

GLENBROOK AVE

PONDEROSA AVE

ZERKER RD

ZERKER RD
7TH STANDARD RD
Copyright nearmap 2015
Tract 7463
City Limits

TRACT BOUNDARY
This map and the data contained within it was generated by the City of Shafter. Please consult the City of Shafter Planning Department with any questions, concerns, or potential inaccuracies that may be associated with this document.

Credits: Esri, HERE, City of Shafter, Nearmap Inc. - Aerial Imagery as of February 2024 0 0.17 0.35 0.7 Miles ¯
EXHIBIT 1: VICINITY MAP

Page 438 of 510 ends

RESOLUTION NO. 3019

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHAFTER APPROVING TENTATIVE TRACT NO. 7463, AS DEPICTED IN EXHIBIT “A”, WHEREAS, Lennar Homes of California, Inc., 5 River Park Place East, Suite 210, Fresno, CA 93720, submitted a Tentative Tract Map application to the City of Shafter to subdivide 181.44 acres (gross) into 548 single-family residential lots, 3 public park lots, 2 basin lots, 1 water well site, and 24 landscape lots within the adopted Mission Lakes Specific Plan; and WHEREAS, Lennar Homes of California, Inc., 5 River Park Place East, Suite 210, Fresno, CA 93720, is requesting approval of Tentative Tract No. 7463 on that certain property in the City of Shafter as shown in Exhibit “A”; and
WHEREAS, the Planning Commission did, on May 13, 2025 approve Resolution No. 25- 459; a Resolution of the Planning Commission of the City of Shafter recommending that the City Council approve Tentative Tract No. 7463 with conditions of approval; and WHEREAS, the City Council, through its secretary, did set Tuesday, June 03, 2025, at the hour of 6:00 p.m. in the Council Chambers of City Hall, 336 Pacific Avenue, Shafter, California, as the time and place for a public hearing before said City Council on said proposal, and notice of the public hearing was given in the manner provided in Title 16 of the Shafter Municipal Code; and
WHEREAS, the project is exempt from the California Environmental Quality Act, i.e., exempt from the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code, pursuant to California Government Code §65457; and WHEREAS, the project is within the scope of the Program Environmental Impact Report (EIR) that was certified for the Mission Lakes Specific Plan in 2005 (SCH No. 2004101029) pursuant to Resolution No. 05-1738; and
WHEREAS, the certified Program EIR adequately describes the activity of the residential development proposed in Tentative Tract No. 7463 and is consistent with the Mission Lakes Specific Plan and approved alterations thereof; and
WHEREAS, the facts presented in the staff report and evidence at the above referenced public hearing support the findings contained in this resolution; and WHEREAS, at said public hearing held on June 03, 2025, the proposed tentative tract map was duly heard and considered, and the City Council found as follows:

1. All required public notices have been given. Hearing notices regarding the proposed project were mailed to property owners within 300 feet of the project area, the mineral rights owner, and published in a local newspaper of general circulation at least 10 days prior to the hearing.

2. The proposed tentative tract map is only proposing residential development consistent with the Mission Lakes Specific Plan as amended. Therefore, the project is exempt

Page 439 of 510 ends

Shafter City Council Resolution No. 3019
June 03, 2025

Page 2 ends

from the California Environmental Quality Act, i.e., exempt from the requirements of Division 13 (commencing with Section 21000) of the Public Resources Code, pursuant to California Government Code §65457. The project is within the scope of the Program Environmental Impact Report (EIR) that was certified for the Mission Lakes Specific Plan in 2005 (SCH No. 2004101029). The certified Program EIR adequately describes the activity of the residential development proposed in Tentative Tract No. 7463 within the Mission Lakes Specific Plan area.

3. The City Council finds the proposed subdivision is in substantial conformity with the Subdivision Map Act and with Title 16 (Subdivision Ordinance) of the Shafter Municipal Code. The proposed lots are in substantial conformance with the provisions of the Mission Lakes Specific Plan and all lots have adequate and proper access to public streets, sanitary sewer, water lines, fire hydrants, drainage structures and utilities.

4. The attached Conditions of Approval are deemed necessary for the safety and welfare of the community and to ensure reasonable surface access is provided for oil and gas exploration and production within the Mission Lakes Specific Plan.

5. Urban services are available for the proposed development. The project is within an area to be served by all necessary utilities and waste disposal systems. Improvements proposed as part of the project will deliver utilities to the individual lots or parcels to be created.

6. The proposed subdivision (Tentative Tract No. 7463), together with the provisions for its design and improvement, is consistent with the City of Shafter General Plan. The proposed density and intensity of development are consistent with the Mission Lakes Specific Plan.

Proposed road improvements are consistent with the Circulation Program. The overall design of the project, as conditioned, is consistent with the goals and policies of all elements of the General Plan.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Shafter, in a regular meeting on the 3rd day of June 2025, hereby approves Tentative Tract Map No. 7463 (Exhibit “A”), as described above and as shown in Exhibit “A”, with conditions of approval as provided in Exhibit “B”.

PASSED AND ADOPTED THIS 3rd DAY OF JUNE, 2025.
_____________________________
Chad Givens, Mayor
ATTEST
_____________________________
Yazmina Pallares, City Clerk

Page 440 of 510 ends

N
TENTATIVE TRACT NO. 7463 FRIANT-KERN CANAL HIGHWAY 99 CALLOWAY DRIVE COFFEE ROAD SNOW ROAD HIGHWAY 65 CALLOWAY CANALZERKER ROAD
7TH STANDARD ROAD
02/05/2025
EXHIBIT "A"

Page 441 of 510 ends

TENTATIVE TRACT NO. 7463
02/05/2025 Page 442 of 510
N

LAKE ROAD

LOT 'AA'

PARK/RECREATION

LOT 'BB' WATER WELL SITE

PUEBLO STREET

MISSION LAKES

BOULEVARD

CHAPALA STREET

ZERKER ROAD

LOT 'B' PARK

MOSSLINE WAY

RAINBOW DRIVE

BIG BASS LANE ROCK HALLOW LANE ANTELOPE ISLAND DRIVE LARK LANE HORSETAIL LANE MOORHEN DRIVE ARTESIA LANE

SUMMIT WAY

CHANNEL LANE ECHO LANE GRAY HAWK LANE

REGATTA LANE

MARSH LANE

LONG POINT LANE

PORCUPINE DRIVE

KNOT DRIVE

CROSSWIND DRIVE CATAMARAN DRIVE

SILVERSTONE DRIVE STARBOARD DRIVE RIO VISTA DRIVE

BRIDGER DRIVE

GILNER LANE

HARBOR LIGHT LANE

PEDREGOZA STREET

EASTSHORE LANE

STARSIDE LANE
548

LOT 'C'

LOT 'E'

LOT 'F'

LOT 'H'

LOT 'I'

LOT 'J'

LOT 'K'

LOT 'P'

LOT 'Q'

LOT 'S'

LOT 'T' LOT 'W'

LOT 'Y' BASIN

LOT 'Z' BASIN

LOT 'L'

LOT 'N'

LOT 'G'

LOT 'D'

LOT 'M'

LOT 'R'

LOT 'O'

LOT 'A' PARK ROBIN LANE

LOT 'CC'

LOT 'DD'

ANTELOPE ISLAND DRIVE

CHAPALA STREET
528
529
530
531
532
533
537 536535 534
538
539
540
541
542
543
544
545
546

LOT 'G' LAKE ROAD N
TENTATIVE TRACT NO. 7463
PARCEL 29 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 28 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 27 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 26 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 31 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 30 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 13 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 21 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 25 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 'D' OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 8 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 9 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 10 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 11 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R.

PARCEL 24 OF PARCEL MAP NO. 11314, BOOK 54 OF MAPS, PAGES 149-158, K.C.R. 390 LOT 'X' LOT 'V' LOT 'U'
02/05/2025 Page 443 of 510

ANTELOPE ISLAND DRIVE

ROBIN LANE

BRIDGER DRIVE

ROCK HALLOW LANE
368
369
370
371
372
373
374 375
376
377
378
379
380
381
396
397
398
399
400
402 401
403
404
405 406
407
408
409
410
411

LOT 'F'

MARSH LANE

MISSION LAKES BOULEVARD
PUEBLO
STREET
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 444 of 510

ANTELOPE ISLAND DRIVE

LOT 'F'

PEDREGOZA STREET

ROBIN LANE

HORSETAIL LANE

EASTSHORE LANE
382
383
384
385
386
387
388
389
390
391
392
393
394
395
412
413
414
423
424
425
426
427
428
429
430
431
432
476
477
478
479
480

MISSION LAKES

BOULEVARD

LOT 'H'

LOT 'K'
415

BRIDGER DRIVE

LARK LANE
475
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 445 of 510

HARBOR LIGHT LANE

ANTELOPE ISLAND DRIVE

PEDREGOZA STREET GILNER LANE
481
482
483
484
485
486
487
488
496
497
498
499
500
501 502
503
504
505
506
507
512
513
514
515
516
537 536 535 538 539
540
541
542
543
544
545
546
547
548

LOT 'G'

MISSION LAKES

BOULEVARD

HORSETAIL LANE
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 446 of 510

LOT 'G'

GILNER LANE

ANTELOPE ISLAND DRIVE
517
518
519
520
521
522
523
524
525 526
527
528
529
530
531
532
533 534

RIO VISTA DRIVE

MISSION LAKES

BOULEVARD

LOT 'AA'
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 447 of 510

STARBOARD DRIVE

SUMMIT WAY

LOT 'E'

RIO VISTA DRIVE ROCK HALLOW LANE

BRIDGER BAY DRIVE

BRIDGER DRIVE
309
310
311
314 313 312
315
316
317
318
319 320 321
322
323
324
343
344
345
346
347
348
349
350
351
352
353 354
355
356
361
362
363 365 364
366
367
PUEBLO
STREET

LOT 'F'
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 448 of 510

ROBIN LANE BRIDGER DRIVE

MARSH LANE EASTSHORE LANE

LARK LANE

STARBOARD DRIVE
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
357
358
359
360
418 420
421
422

LOT 'N'

RIO VISTA DRIVE
416
417
419

LOT 'M'

LOT 'B' PARK
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 449 of 510

PEDREGOZA STREET

HORSETAIL LANE

HARBOR LIGHT LANE
433
434
435
436
437
438
439
448
449
450
451
452
453
454
455
456
457
466
467
468
469
471 470
472
473
474
489
490
491
492
493
494
495

LOT 'L'

EASTSHORE LANE

RIO VISTA DRIVE

LOT 'H'

LOT 'K'

LOT 'J'

LOT 'I'
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 450 of 510

HARBOR LIGHT LANE

GILNER LANE
508
509
510
511

LOT 'Z' BASIN

RIO VISTA DRIVE

LOT 'AA'
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 451 of 510

SILVERSTONE DRIVE

STARBOARD DRIVE

STARBOARD DRIVE

MARSH LANE

EASTSHORE LANE
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
325
326
327
328
329
330
331

LOT 'O'

LOT 'BB' WATER WELL SITE

RAINBOW DRIVE

LONG POINT LANE

LOT 'AA'
332
271
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 452 of 510

HORSETAIL LANE

PEDREGOZA STREET

PEDREGOZA STREET

HORSETAIL LANE

HARBOR LIGHT LANE

RAINBOW DRIVE
440
441
442
443
444
445
446
447
458
459
460
461
462
463
464
465

RAINBOW DRIVE

EASTSHORE LANE

LOT 'AA'

LOT 'I'

LOT 'J'

STARBOARD

DRIVE N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 453 of 510

RAINBOW DRIVE

STARSIDE LANE GRAY HAWK LANE

STARBOARD DRIVE

PORCUPINE DRIVE

PORCUPINE DRIVE
207
208 209 211 210
227
228 229
230
256
257
258
259
260
266
268
263
337
340 339 338
341
342
PUEBLO
STREET

ROCK HALLOW LANE

MOSSLINE WAY

LOT 'E'

CHANNEL LANE
333
334
336 335
270
269
264 265 267
261
262
212 213
215
214

LOT 'CC'
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 454 of 510

MOORHEN DRIVE

ECHO LANE

LONG POINT LANE

SILVERSTONE DRIVE

CROSSWIND DRIVE

STARSIDE LANE
152 151 150
153
154
155
156
157
158
159
160
161
162
163
173
174
175
176
177
178
179
180
181 182
183
184
185
186
187
193
194
195
196
197
198
199
200
201
202
203
204
205
206
231
232
233
234
235
236
237
238

LOT 'P'

LOT 'Q'

LOT 'R'

RAINBOW DRIVE

PORCUPINE DRIVE
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 455 of 510

SILVERSTONE DRIVE

MOORHEN DRIVE

CROSSWIND DRIVE

BIG BASS LANE
147
148 149
164 165 166 167
168 171 170 169
172
188 189 190 191
192

LOT 'Y' BASIN

LOT 'AA'
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 456 of 510

LOT 'AA'

LAKE ROAD

MISSION LAKES BOULEVARD
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 457 of 510

CROSSWIND DRIVE

KNOT DRIVE

GRAY HAWK LANE CHANNEL WAY LANE

PORCUPINE DRIVE

MOSSLINE WAY
24 25
26 27
28 29 30
33 34
35 36
217
218
220
226
239
240
241
242
243
245 246 247 248
249
250
251
252
253
254
255

LOT 'A' PARK
31 PUEBLO
STREET

ARTESIA LANE

STARSIDE LANE

REGATTA
LANE

LOT 'D'

ECHO LANE
225
224
222 223 221
219
216

LOT 'DD'
32 244 LOT 'V'N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 458 of 510

ARTESIA LANE

KNOT DRIVE

CROSSWIND DRIVE
110
114 113 112 111
116
117
118
119
120
121
122
123
124
125
126
127
128
129

LOT 'X'
131
132
133 134 135 136

LOT 'S'
130

ECHO LANE

LONG POINT LANE

BIG BASS LANE
115
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 459 of 510

KNOT DRIVE

BIG BASS LANE
137
138
139
140
141
142
143
144
145
146

CROSSWIND DRIVE
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 460 of 510

REGATTA LANE

CATAMARAN DRIVE

KNOT DRIVE
7 8 11 10 9
12 13
14 15
16 17
18 19
20 21
22 23

LOT 'U'
45 46
47 48
49 50
51 52
53 54
44 PUEBLO
STREET

MISSION LAKES

BOULEVARD

LOT 'D'
57 58
55 56
42 43
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 461 of 510

ARTESIA LANE

LOT 'D'

KNOT DRIVE

CATAMARAN DRIVE
1 2
3 4
5 6
37 38
39 40
59 60
61 62
63 64
65 66 67
68 69
70 71 72 73
88 87 86
89 90 91
92 93
94 95
96 97 98
99 100
101
102
103
104 105

LOT 'C'

LOT 'T'

LOT 'W'

MISSION LAKES

BOULEVARD
41 N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 462 of 510

CATAMARAN DRIVE

LOT 'C'

BIG BASS LANE

KNOT DRIVE
74 75
76 77
78 79
80 81
82 84 83
85 106 107
108
109

MISSION LAKES

BOULEVARD
N
TENTATIVE TRACT NO. 7463
02/05/2025 Page 463 of 510
1 EXHIBIT “B”

CONDITIONS OF APPROVAL
TENTATIVE TRACT NO. 7463

GENERAL

1. The owner(s), project proponent(s), and/or applicant(s) (hereinafter referred to as “Developer”), solely at their cost and expense, shall defend, indemnify and hold harmless the City of Shafter (hereinafter referred to as “City”), its agents, legislative bodies, officers and employees regarding any legal or administrative action, claim or proceeding concerning approval of Tentative Tract No. 7463 and/or related actions including, without limitation, actions taken or not taken with respect to the California Environmental Quality Act (hereinafter referred to as “CEQA”); or, at its election and in the alternative, shall relinquish such approval. Developer shall assume the defense of the City in any such legal or administrative action, claim or proceeding with legal counsel paid for in the entirety by Developer, but subject to the City's reasonable approvals. Developer shall also reimburse the City, its agents, legislative bodies, officers and employees for any judgments, amounts paid in settlements, court costs and attorneys' fees which the City, its agents, legislative bodies, officers and employees may be required to pay or otherwise pay because of such action, claim, or proceeding. The City may, at its sole discretion, participate at its own expense in the defense of any such action, claim or proceeding, but such participation shall not relieve Developer’s obligations under these conditions of approval (hereinafter referred to as “Conditions”).

2. The Developer or the Developer’s engineer shall submit a list of all contractors and/or subcontractors performing work on this project to the City Finance Department and such contractors and subcontractors shall obtain valid business licenses to do business and/or work in the City of Shafter.

3. The following disclosure shall be given as part of transfer of properties: “All your real property is near property used for agricultural operations, you may be subject to inconveniences or discomforts arising from such operations on any 24-hour basis. Said discomforts may include, but not be limited to equipment noises, odors from manure or other chemicals, and dust or smoke. The City has determined that the use of real property for agricultural operations is a high priority and favored use to the City and Kern County and will not be considered a nuisance for those inconveniences or discomforts arising from agricultural operations, provided such operations are consistent with accepted customs, standards, and laws.”

4. Until all portions of the tentative tract have been developed, all vacant and undeveloped land, not being actively farmed, shall be maintained in a weed-free and clean manner by the Developer. Should said property not be so maintained, the City shall notify the property owner that the property is to be cleaned within thirty (30) days of receipt of said notice. If the property owner does not comply within the required time frame, City may then clear the land and bill the property owner for expenses incurred.

Page 464 of 510 ends

2 5. Unless a final map is recorded, this tentative tract shall expire twenty-four (24) months from the date of approval by the City Council, unless an extension is granted by the City Council.

Should an extension be requested, Developer, not less than sixty (60) days prior to the expiration date, shall submit to the City, the applicable processing fees and a completed application requesting an extension of the map approval in accordance with the provisions of City Code and the Subdivision Map Act. PLEASE NOTE: This will be the only notice given for the above specific expiration date. The applicant is responsible for initiating an extension request.

6. All construction and development shall be consistent with the City of Shafter Mission Lakes Specific Plan and Tentative Tract No. 7463.

PLANNING

7. Prior to initiating any grading or earthmoving within Tract No. 7463, the Developer shall provide the City of Shafter Planning Department with written confirmation from the San Joaquin Valley Air Pollution Control District (SJVAPCD) that the proposed development follows the requirements of the District’s Rule 9510.

8. The Developer shall be required to permanently maintain all landscaping, except for landscaping included in the Community Facilities District, including the replacement of any trees or shrubs that do not survive.

9. Only the street names or alternate street names that have been approved on the attached Tentative Tract Map shall be shown on the Final Map(s) for Tract No. 7463. If the Developer wishes to change the street names at any point in time, a street name change request will need to be submitted to the Shafter Planning Department and approved prior to changing or using any proposed street names.

10. If the Developer proposes to phase the map or make any changes to the approved tentative map contents, the Developer shall submit a Substantial Conformance application to the Planning Director for review and approval. If the map is phased, the Planning Department may request that the Developer apply for a Change of Conditions to update any affected conditions as necessary.

11. Approved access shall be provided for each lot in accordance with City standards.

12. All roof-mounted air conditioning equipment shall be located on the rear portion of the roof ridge line in such a manner as to be screened as much as practical from view from public streets.

13. With the exception of model houses, as provided in Section 3.080, Chapter 3, Title 16 (Subdivision Ordinance) of the Shafter Municipal Code, no building permit shall be issued by the City of Shafter until Tract No. 7463 has been recorded pursuant to the requirements of Title 16 (Subdivision Ordinance) and Title 17 (Zoning Ordinance) of the Shafter Municipal Code.

Page 465 of 510 ends

3 14. If Condition No. 146 is initiated by the Developer and executed by the City of Shafter, no building permit shall be issued until wet utilities have been installed, an all-weather surface roadway is completed on the subject property, and survey stakes or other form of temporary documentation will be provided for, and approved by the Building and Safety Inspector, to verify building location. Missing stakes or other temporary documentation will result in delays in inspection schedule.

15. The following note shall appear on the final map and all grading and construction plans:
a. If during grading or construction, any plugged, abandoned, or unrecorded oil or gas wells are uncovered or damaged, the California Department of Conservation/Geologic Energy Management Division (CalGEM) shall be contacted to inspect and approve any remediation required.
b. If any abandoned water wells are located within the development or discovered during excavation or grading, the Kern County Public Health Department - Environmental Health Services Program must be contacted to obtain information for the proper permitting and destruction procedures.
c. Building setbacks on lots with existing plugged wells shall satisfy the requirements of the CalGEM. If the recommended setbacks cannot be satisfied, the Developer shall submit, concurrent with the submittal for a building permit for the impacted lot, written confirmation from the CalGEM that the setback provided is acceptable.

16. During grading operations, all activity shall be restricted to periods of low wind to reduce dust emissions. Verification of compliance will be the responsibility of the City of Shafter Building Inspection Division.

17. Prior to construction, the Developer shall submit plans for the public parks to be developed on Lot ‘A’, Lot ‘B’, and Lot ‘AA’, approved under Tentative Tract No. 7463. The public park designs shall be approved by the City of Shafter in consultation with the North of the River Recreation and Park District. The public parks in Tract 7463 shall be fully constructed, landscaped, and completed by the Developer, consistent with the Mission Lakes Specific Plan and all applicable standards, prior to receiving over 60% of the Certificates of Occupancy (more specifically being the 329th Certificate of Occupancy) for this subject tract. Lot ‘A’, Lot ‘B’, and Lot ‘AA’ shall be dedicated/deeded to the North of the River Recreation and Park District upon completion and acceptance of all improvements by the City of Shafter.

As an alternative to dedication and transfer of ownership of the public parks to the North of the River Recreation and Park District, and subject to authority granted in state law, Developer may request the City consider alternative arrangements for the dedication and transfer of the public parks, as authorized by state law, either to the City of Shafter or a combination of the City of Shafter and the North of the River Recreation and Park District.

Such alternative arrangements shall be memorialized in an agreement approved by the City of Shafter and the North of the River Recreation and Park District, prior to acceptance of all improvements by the City of Shafter (except for the issuance of a certificate of occupancy

Page 466 of 510 ends

4 for model homes). Nothing contained herein shall obligate the City or the North of the River Recreation and Park District to accept such alternative dedication and transfer.

18. The Developer of Tract No. 7463 shall comply with all SJVAPCD requirements while grading and developing the site. It is the Developer’s responsibility to contact the SJVAPCD to determine with which requirements/rules the Developer must comply.

19. Prior to recordation of any final map for Tract No. 7463, the Developer shall enter into a development agreement with the City of Shafter, in a form and substance reasonably approved and required by the City, which shall provide for a minimum square footage of residential units within the subdivision, and which shall provide for payment of park fees, traffic fees, and any other fees deemed necessary by the City.

20. All utilities shall be designed and constructed in such a way as to allow for them to be extended into any future residential development areas.

21. The landscape lots and trail system in Tract No. 7463 shall be planted with a combination of evergreen and deciduous trees at a density sufficient to provide a year-round visual buffer.

Tree species and spacing shall be reviewed and approved by the City as part of the approval of the landscape plans for the tract.

22. If during development activities, any wells are encountered, the property owner is expected to immediately notify the CalGEM construction site well review engineer in the Inland district office, and file for Division review an amended site plan with well casing diagrams.

23. On all corner lots and/or reverse corner lots within the tract, fences/walls shall not be located within the first 5 feet of the Public Utility Easement behind the street side yard and frontyard property lines. A note stating this must be included on all site plans during building permit review. The City will not permit walls nor fences to be built within the first five (5) feet of the PUE dedication on the side-yard of corner/reverse corner lots.

24. No permanent structure shall be built within a 10-foot radius of any existing wells within Tract No. 7463.

25. The design of all houses proposed to be built by the Developer/Home Builder(s) within Tract 7463 must be in substantial conformance with the Mission Lakes Specific Plan Chapter 5: Design Guidelines.

26. The Developer/Home Builder of Tract 7463 shall use a variety of floor plans within the residential tract as required in the City of Shafter Zoning Ordinance Table 2.B (Residential Floor Plan and Elevations Guidelines). Floor plans and elevations will be subject to the review and approval of the Shafter Planning and Building Departments. The Developer/Home Builder shall plot alternative floor plan types and/or elevation styles on contiguous lots within Tract 7463.

BUILDING

Page 467 of 510 ends

5 27. Prior to issuing a certificate of occupancy for any building, the building address(es) shall be permanently installed and be clearly visible from the street.

28. The Developer shall obtain a letter from Kern County Fire Department stating Kern County Fire’s approval of construction of 199 dwelling units without a secondary access. A copy of this letter shall be provided to the Building Department prior to the recording of a Final Map.

29. Prior to issuance of the first building permit, the Developer shall provide written confirmation from the SJVAPCD confirming that any and all applicable off-site mitigation fees for the subdivision have been paid in full.

30. No final inspection or issuance of a certificate of occupancy shall be approved for any lot until all required improvements have been completed by the Developer and accepted by the City.

31. Developer shall pay all development fees and impact fees adopted by the City in effect at the time of issuance of any building permits. The Developer can also elect to pay traffic impact fees at the time of each building permit’s issuance.

32. Developer shall comply with the latest California Building Code, California Mechanical Code, California Plumbing Code, California Electrical Code, California Fire Code and all other applicable codes, ordinances, regulations, and development standards in effect at the time of issuance of relative permits.

33. Prior to issuance of each building permit for houses within Tract No. 7463, Developer shall submit a site plan to the City Planning Department for review and approval. The site plan shall reference the floor plan layout and building elevations, including exterior building materials and colors, for each of the single-family residences to be constructed within Tract No. 7463. The siting of each structure on the plans must comply with the applicable lot development standards of the latest Mission Lakes Specific Plan.

34. Private drives constructed of Portland cement concrete shall be constructed at a minimum width of 16 feet from the edge of public roadway pavement to the garage of each home.

35. A landscaping plan, including design of a permanent irrigation system, shall be submitted to and approved by the Planning Director and City Engineer. Said approved landscape and irrigation plan shall be implemented prior to receiving a final inspection for any house constructed within the subdivision. All landscaping is subject to the requirements for landscaping contained herein these conditions and with City Standards. Landscaping shall include an irrigation system for both the front-yard and the street side-yard (where applicable) provided the street side-yard is not obscured from sight from an adjacent street by fencing, for each lot within the subdivision. Landscaping shall comply with current State guidelines for residential landscaping.

36. Fiber Optic Installation for Dwelling Units: Owner agrees to install in each dwelling unit the following fiber optic requirements:

Page 468 of 510 ends

6 a. Install a Dedicated City Fiber Enclosure adjacent to the other utility enclosures or a Common Communication Enclosure (collectively “Utility Enclosure”) for the proposed communications utilities (phone, cable, fiber, etc.). The enclosure type shall be Benner-Nawman 14326W-UL or as approved by the City. The Utility Enclosure may face the garage exterior or interior and shall include one 120-volt, 15-amp convenience receptacle inside the enclosure mounted on either side of the wall. A surge-protected receptacle must be installed or verification that an equivalent surge protection device (SPD) has been installed as an integral part of the service equipment or located immediately adjacent to the service equipment to be in accordance with article 230.67 of the California Electrical Code.
b. Install a wireless-transparent Structured Media Enclosure (“Media Enclosure”), such as models: Legrand 30” ENP3050, Legrand 42” ENP4250, Leviton 30” 49605-30W, Primex Verge 30” P3000, 42” Primex Verge P4200, or as approved by the City. The Media Enclosure shall be installed in the wall of a master bedroom closet or a laundry room furthest from the water supply and maintain a minimum 48-inch horizontal clearance between and 24-inch clearance above any metallic appliances or accessories.

The Media Enclosure shall include one 120-volt, 15-amp convenience receptacle located inside the enclosure.
c. Install a conduit pathway from the Utility Enclosure to the Media Enclosure with a minimum of one (1) 1-inch diameter non-metallic, flexible conduit which shall maintain a minimum 36-inch bend radius and protrude a minimum of 6-inches into the enclosures. The conduit shall be marked with orange Tyvek or plastic tags, labeled “City Fiber Use Only”, 661-746-8929”, tie wrapped to the conduit in plain view within the enclosures.
d. Install a continuous conduit without breaks or couplings from the existing City Fiber Distribution Enclosure located in the right-of-way (“Distribution Enclosure”) to the bottom side of the Utility Enclosure. The conduit shall be installed a minimum of 36- inches below grade, protrude a minimum of 12-inches into the Utility Enclosure, be orange in color, and be factory labeled “City of Shafter 661-746-8929”. If the conduit does not have an integrated tracer wire, a continuous external #12 AWG solidconductor tracer wire with high-density polyethylene insulation rated for direct burial shall be installed along with the conduit leaving a minimum 15-feet of slack coiled in the Distribution Enclosure and 3-feet of slack coiled in the Utility Enclosure. The conduit and tracer wire shall be inspected by a City of Shafter representative before shading and backfilling.
i. After backfilling, polyester cable pulling tape (Muletape), or equivalent, shall be installed in all conduit paths between the Distribution Enclosure and the Utility Enclosure. Mule tape shall be slack (no tension) and fastened to the plug or cap. ii. Couplings shall be used to repair damaged or short-length conduit only if approved by the City. Conduit couplings shall be an air-tight, water-tight, pushon compression fitting approved by the City. Tracer wire couplings shall be airtight, water-tight, twist on or compression connector approved by the City.

Coupling integrity shall be inspected by a City of Shafter representative.

Page 469 of 510 ends

7 e. Category 6 Unshielded Twisted Pair (CAT 6 UTP) cable (or as approved by the City) shall be installed according to industry standards and the requirements below, and shall not be pinched, stapled, bent sharply, or crossing any sharp, unprotected edges:
i. Install a minimum of two (2) cables from the Utility Enclosure to the Media Enclosure.

ENGINEERING

37. Developer shall remove and replace any existing public or private improvements that may become damaged during any phase of construction, as required by the City Engineer. The contractor working within the public right-of-way shall obtain an encroachment permit from the City Engineer prior to commencing any such work.

38. Developer shall relocate and/or install all necessary infrastructure to provide utilities to the proposed project.

39. A ten (10) foot public utility easement, as shown on the tentative map, shall be provided in the front of all lots and on the street side of all corner lots/reverse corner lots as requested by the utility companies and the City Engineer. Easements shall be granted with the final map. Easements must also be shown on individual site plans during building permit application review.

40. Easements to be given to the City or any other public utility agency for sewer, water, storm drain, electrical, or any other utility or similar purpose shall not cross private property without prior approval of the City Engineer.

41. Any above-ground utility cabinets or facilities to be located within the road right-of-way or public utility easement shall be permitted only upon approval by the City Engineer. Such approval will be made in writing, upon written request of the applicant and/or the affected utility company.

42. Any obstructions including utilities, irrigation lines, etc., shall be removed and/or relocated, if necessary, at the expense of the Developer.

43. No final inspection shall be approved until all required improvements have been completed by the applicant and accepted by the City of Shafter.

44. All new utilities shall be underground service.

45. During construction, vehicular access points shall be covered with decomposed granite, road oil, or some other treatment acceptable to the City Engineer, to prevent generation of dust during periods of vehicular activity and/or windy conditions and tracking of mud and dirt on public roadways.

46. Prior to the issuance of a Certificate of Occupancy on any lot of Tract No. 7463, all required improvements shall be completed and accepted by the City of Shafter. Required improvements shall be those improvements necessary to provide adequate City Services to the subject lot as determined by the City Engineer.

Page 470 of 510 ends

8 47. All improvements shall be complete within one (1) year from the date of filing of the final map for the development unless a time extension is granted by the City Engineer. The timing of improvements shall be subject to approval of the City Engineer.

48. Type and location of centralized mail delivery units shall be determined by the postal service. If the postal service requires special easements for the placement of the delivery units, then said easements shall be shown on the final map.

49. All road, landscaping, trail, sidewalk, block wall, and paseo improvements, required by and consistent with Tract No. 7463 and the Mission Lakes Specific Plan, shall be constructed by the Developer and approved by the City of Shafter prior to recordation of the final map or shall be included as a public improvement in the subdivision improvement agreement. Wall plans, materials, and dimensions shall be consistent with the requirements of the Mission Lakes Specific Plan and Tentative Tract No. 7463 and shall be approved by the City of Shafter prior to construction. The timing of improvements shall be subject to approval of the City Engineer.

50. Developer shall place the entire subdivision within a new or add to an existing Community Facilities District prior to recordation of a final map and prior to acceptance of improvements by the City of Shafter. The maintenance district shall be set-up to cover the cost of street lighting, drainage basin maintenance, landscaping maintenance, and/or park maintenance, as well as all administrative costs associated with the City of Shafter’s management of the District.
a. The Developer shall be required to cover the cost of street lighting, maintain all landscaping, park maintenance, including the replacement of any trees or shrubs that do not survive, within public right-of-way and landscape easements for a period of one (1) year after final inspection of the landscape improvements, or until such time as the maintenance district is formed, whichever shall occur last. b. Developer shall be fully responsible for the formation, and formation cost of the Community Facilities District, as directed by the City Engineer. c. Developer shall be fully responsible for paying the cost of water for all landscaping and electricity for the streetlights for a period of one (1) year after issuance of Notice of Completion.

51. Engineered plans and building permits are required for all block walls greater than 6 feet in height.

52. Developer shall design and install a system of conduits, terminal enclosures, distribution enclosures, splice enclosures, connection points, and hand holes for a fiber optic network to each buildable lot within the development. Design and material specifications are available from the City of Shafter. Plans shall be submitted to and approved by the City of Shafter, prior to recordation of the final map, showing the proposed utility trench and all appurtenant hardware. The design shall include the following minimum specifications:

Page 471 of 510 ends

9 a. A combination of fiber optic conduits shall minimally include 4” SDR-11 HDPE, 2” SDR-11 HDPE, 1.25” SDR-11 HDPE, and 7-Way bundled HPDE innerduct with attached tracer wire. Fiber optic conduits may be joint-trenched with other utility company pipes and/or conduits.
b. All underground fiber optic conduits, innerduct bundles, etc. shall be factory-labeled “City of Shafter 661-746-8929”. Conduits shall be identified by a permanent marking, with the address number of the residence they serve, within the distribution enclosures.
c. All underground fiber optic conduit paths shall have tracer wire. If the conduit does not have an integrated tracer wire, a continuous external #12 AWG solid-conductor tracer wire with high-density polyethylene insulation rated for direct burial shall be installed along with the conduit leaving a minimum 15-feet of slack coiled in the endpoint enclosures.
d. The ends of all fiber optic conduits and innerducts shall be plugged or capped to prevent dirt, debris, or foreign objects from entering. e. After backfilling, all conduits shall be checked for obstructions, and re-excavated and repaired or replaced as required. All conduits ½-inch or larger shall require polyester cable pulling tape (Muletape) or equivalent installed. Polyester cable pulling tape (Muletape) shall be slack (no tension) and fastened to the plug or cap. Innerducts shall be mandrel tested and are subject to inspection by a City of Shafter representative.
f. A combination of underground utility enclosures shall minimally include 36”W x 60”L x 36”D polymer concrete enclosures with dual torsion covers, 36”W x 36”L x 24-36”D and 24”W x 36”L x 24-36”D High Density Polyethylene (HDPE) enclosures.
g. All underground utility enclosures shall be factory-stamped “City Fiber”.

53. Prior to construction, all improvement plans and landscaping plans shall be approved by the City of Shafter.

54. The side-yard fences constructed along local streets shall consist of a masonry block retaining wall, or other material as approved by the City Engineer, topped with a wooden fence. Sufficient area behind the sidewalk shall be provided to accommodate the installation of community mailboxes, where required by the US Postal Service.

55. The final subdivision map proposed for recordation shall be in substantial conformance with the approved tentative map or any approved alterations thereafter.

ENGINEERING: GRADING & DRAINAGE

56. Prior to review of any required improvement plans, both a drainage/hydrology study and a grading plan shall be submitted to and approved by the City Engineer. A master grading plan covering Tract No. 7463 shall be submitted and approved. Future development plans shall be based upon the approved master plan. Any deviation from the approved master plan will require the approval of the City Engineer.

57. The drainage/hydrology study and hydraulic analysis for the project shall be performed by a registered civil engineer and submitted to the City Engineer for review and approval. The

Page 472 of 510 ends

10 study shall demonstrate that any potential run-off will not impact surrounding properties.

The study shall focus on the project property and any affected adjacent properties.

58. A soils report, prepared by a registered civil engineer shall be submitted along with the grading plan. Soils report shall be performed in compliance with the latest edition of California Building Code, and Chapter 15.28 of the Shafter Municipal Code. In addition, all site grading, earthwork and building design shall be performed in accordance with the recommendations of the soils report.

59. A grading permit shall be obtained from the City prior to commencement of any grading activity.

60. Prior to issuance of a building permit, the Developer shall file a “Rough Grade Certificate” with the City in accordance with the City Engineering Design Standards. Rough Grade Certificate shall be accompanied by certified soil compaction test data from an acceptable materials testing company and a certificate that the rough grade is in substantial conformance with the approved grading plan and Chapter 15.28 of the Shafter Municipal Code. Developer to obtain “Rough Grade Certificate” form from the City.

61. Prior to final approval, acceptance of work, or issuance of Certificate of Occupancy, the Developer’s engineer shall file a “Final Grade Certificate” stating that all required grading has been done in accordance with the approved grading plan. Developer to obtain “Final Grade Certificate” form from the City.

62. The location and frequency of soils compaction testing shall be per the City Engineer. Soils compaction testing shall be provided by the Developer.

63. Minimum slopes across any flat surface shall be 1%. For slopes less than 1%, surface drainage shall be channeled into a concrete v-gutter, curb and gutter, underground storm drain, or similar drainage structure.

64. All building pads shall provide a minimum of 2% slope away from each house to an earth swale, and a minimum of 1% from the highest point in the swale to the street. A four-inch landscape drain may be used to replace the earth swale. The minimum pad height shall be twelve (12) inches above the adjacent curb.

65. Street side corner lots shall not have their side yard slope (finish grade to back of sidewalk) exceed 4 horizontal: 1 vertical. If maximum slope is exceeded, side yard shall be retained in an approved manner.

66. Wood retaining structures shall not be approved. Developer shall use masonry, keystone, concrete, or other approved material.

67. Engineered off-site drainage plans for Tentative Tract No. 7463 shall be submitted to and approved by the City of Shafter prior to recordation of a final map. The approved drainage facilities shall be constructed and approved by the City of Shafter prior to issuance of building permits.

Page 473 of 510 ends

11 68. All storm drain pipes and manholes shall be installed with the street paving. Catch basin shall be installed per city standards.

69. Drainage Basin:
a. Developer shall construct a drainage basin on Lot Y and Lot Z as shown on the Tentative Tract Map No. 7463. Developer shall provide calculations showing all drainage areas utilizing the basin, and show the percentage of the capacity utilized by Tract No. 7463.
b. Developer shall construct permanent masonry walls around the proposed drainage basin on Lot Y with a minimum 16’ access controlled by a gate. c. Developer shall construct permanent masonry walls around the proposed drainage basin on Lot Z with a minimum 16’ access controlled by a gate.

70. The number and location of street-based siphons and cross gutters allowed, if any, will be determined during the grading and drainage review process. The minimum grade for allowed cross gutters shall be 0.6%.

71. Grading onto adjacent property shall not be done without written permission from the adjacent property owner.

72. The Office of the City Engineer shall be notified 24 hours in advance of the placement of any fill material.

73. Fill and/or import material shall be subject to the approval of the soils engineer.

74. Developer is responsible for the grading of lot pad areas to within 0.1 foot of the design elevations.

75. All areas in the site on which structures are to be placed must be compacted to 90% relative density, for a minimum distance of 5-feet in all directions from the foundations of the structure.

76. All fill material shall be moisture conditioned to at least 2% above optimum moisture and compacted to 90% relative density, as determined by test methods referenced in Chapter

15.28 of the Shafter Municipal Code, and so certified by test and report from the soils engineer.

77. The design engineer shall exercise sufficient supervisory control during grading operations to ensure compliance with the plans, specifications, and code within his purview.

78. The placement of fill shall be in 6-inch-maximum lifts, compacted with heavy compaction equipment approved by the City Engineer, unless specifically recommended otherwise in the preliminary soils report.

79. Compaction in proposed pavement areas should be per City standards and should extend to a minimum distance of 2-feet beyond the outside edges of pavement.

Page 474 of 510 ends

12 80. All cut and fill slopes shall not be steeper than 2 horizontal to 1 vertical.

81. All fill areas to be cleared of all vegetation and other unsuitable materials for a structural fill and the areas shall be scarified to a depth of 6-inches, unless specifically noted otherwise in the preliminary soils report.

82. All slopes in excess of three (3) feet shall be prepared and maintained to control against erosion.

83. Grading work shall be supervised as engineered grading in accordance with Chapter 15.28 of the Shafter Municipal Code.

84. During grading, reasonable searching should be performed for concealed subsurface obstructions. All abandoned subsurface obstructions should be removed. If terminus of any abandoned piping is outside the project limits, the piping should be removed within the project and properly capped at the project boundary.

85. Developer's attention is directed to the provisions of SJVAPCD's Regulation VIII - Fugitive PM 10 Prohibitions, which requires the submission of a Dust Control Plan for certain construction projects. Developer shall comply with all applicable SJVAPCD rules and regulations including the submission of a Dust Control Plan as may be applicable.

Current SJVAPCD rules and regulations are available online at http://www.valleyair.org/rules/1ruleslist.htm.

86. It shall be the Developer's responsibility to prevent a dust nuisance from originating from the site of the work as a result of his operations. Preventative measures to be taken by the Contractor shall include but shall not be limited to the following:
a. Water shall be applied to all unpaved areas as required to prevent the surface from becoming dry enough to permit dust formation.
b. Paved surfaces over which vehicular traffic is permitted to travel shall be kept free of dirt.
c. Temporary suspension of the work, either as a result of order by the Engineer or as a result of conditions beyond the control of the Contractor shall not relieve the Contractor from his responsibility for dust control as set forth herein.

87. Any temporary drainage basin serving the subdivision shall be surrounded with a chain link fence with privacy slats.

ENGINEERING: WATER/FIRE

88. The Developer shall install two water systems for the project together with such equipment, pipeline, and facilities, including individual water services, as may be necessary to ensure the development has a minimum supply of water for the purposes of the development including fire protection. One water system shall be developed exclusively for drinking or domestic water service. The other shall be for fire protection, irrigation of lawns, parks,

Page 475 of 510 ends

13 and common landscape area and be provided by either existing or new wells. Developer shall submit water improvement plans to the City Engineer and Oildale Mutual Water Company for review and approval. Developer shall construct the public water system in accordance with Subdivision Engineering Design Manual for the subject property. The dual water system shall be constructed by the Developer and approved by the City of Shafter and Oildale Mutual Water Company prior to recordation of the final map.

89. To the greatest extent possible, above ground air-vac or air release valves required by Oildale Mutual Water Company shall be in public landscaping or entrances to Natural Trail areas, and not along residential property frontages. This requirement is subject to the approval of Oildale Mutual Water Company.

90. To the greatest extent possible, wet utilities (sewer, water, storm drain) shall be installed between the flowlines on all streets.

91. Fire protection shall be provided per Kern County Fire Department Standards for the type of development. A Certificate of Approval shall be obtained by the Developer from the Kern County Fire Department. Evidence of this Certificate of Approval shall be provided to the City prior to acceptance of the water system by the City.

92. Prior to installation, all water improvement plans shall be reviewed and approved by the Kern County Fire Department. The review includes hydrant locations and access into and out of the tract. A plan review permit, obtained from the Kern County Fire Department, must be applied and paid for prior to the review of any modified or new tract map.

93. The water line size, location and materials shall be subject to the approval of the City Engineer. The minimum water line size shall be in accordance with the Subdivision and Engineering Design Manual.

94. Tie-ins to existing water mains shall be constructed in a manner approved by the City Engineer.

95. Whenever possible, the water system shall be looped to minimize dead ends.

96. Separate dual water services shall be installed for each residential property.

97. No permanent structures shall be constructed over proposed or existing utility easements.

98. Prior to issuance of a building permit, water mains and fire hydrants to be installed by applicant shall be completed, tested, and accepted (CFC).

99. The Developer shall provide AWWA approved fire hydrants that comply with Kern County Development Standards (Clow 850 or equivalent).
100. The required fire hydrants shall be placed a maximum of 660 feet apart throughout the tract for firefighting purposes. Final hydrant locations shall be approved by Kern County Fire prior to installation.

Page 476 of 510 ends

14 101. The Developer shall install reflective markers to identify hydrant locations pursuant to California Health and Safety Code 13060.
102. The required fire hydrants shall provide a minimum fire flow of 1,500 gallons per minute for 2 hours with 20 PSI residual, as determined by the Kern County Fire Department. 103. The water system for the required fire hydrants shall be looped, if practicable. 104. The Developer shall install the required water, access and street signs prior to issuance of any building permit.
105. A fire flow test shall be performed and approved by the Kern County Fire Department prior to issuance of any building permit and before any Certificates of Occupancy are issued.

The Kern County Fire Department shall be contacted for a fire flow test and approval prior to the commencement of construction.
106. All fire access roads to each parcel must meet specifications set forth in Section 503.2 of the California Fire Code and the applicable Appendix and Ordinance sections. 107. All new residential construction will require automatic fire sprinklers and shall meet all other fire requirements of the California Fire Code.

ENGINEERING: SEWER
108. No properties shall be served by a septic system.
109. Developer shall install a sewer system for the development together with such materials, pipelines, manholes, and individual services for the purposes of the development. Developer shall submit sewer improvement plans to the City Engineer for review and approval prior to recordation of the final map. Developer shall construct the public sewer system in accordance with the Shafter Subdivision Engineering Design Manual for the subject property.
110. Sewer line size, location, slope, and materials shall be subject to the approval of the City Engineer. Minimum sewer line size, location, slope, and materials shall also be in accordance with the Subdivision and Engineering Design Manual. 111. Tie-ins to existing sewer mains, manholes, or other structures shall be constructed as directed by the City Engineer.
112. Sewer pipelines and manholes shall be installed within the proposed street paving of the development.
113. Separate sewer services shall be installed for each property. At no time shall sewer be joint trenched with water.
114. Sewer lines shall not be permitted in easements between the backyards or side-yards of residential lots.

Page 477 of 510 ends

15 115. No permanent structures shall be constructed over proposed or existing utility easements.

ENGINEERING: STREET & TRAFFIC
116. Developer shall construct and provide rights-of-way for all streets, curb, gutter, cross gutter, drainage facilities, sidewalks, walls, landscaping, streetlights, drive approaches, intersections, and other related improvements consistent with Tentative Tract No. 7463 and the Mission Lakes Specific Plan. Developer shall submit street improvement plans prepared by a registered civil engineer to the City Engineer for review and approval and shall include:

Preliminary soils report, preliminary engineer’s estimate of construction costs; and plan check and inspection fees.
117. Additional rights of way easements or dedications necessary for street and/or public utility improvements located outside the tract boundary shall be granted to the City of Shafter prior to map recordation.
118. The drawings shall include all proposed public street pavement, curb, gutter, driveways, streetlights, cross gutter, catch basins, striping, signage, traffic signals, and sidewalks along the perimeter of all streets adjacent to or within the project site. Said improvements shall be constructed as per the street improvement plans approved by the City Engineer in a manner consistent with the Subdivision and Engineering Design Manual. 119. All local streets shall be developed as full-width streets in accordance with standards and specifications of the Mission Lakes Specific Plan and the City of Shafter, as approved by the City Engineer. All local streets shall be fifty-two (52) feet full right-of-way with forty (40) feet flowline to flowline.
120. Additional Street Requirements:
a. Developer intends to continue to use a modified 4.5-inch wedge shaped curb along home frontages similar to City of Fresno Standard P-9. City of Shafter agrees to the use of this 4.5-inch wedge shaped curb provided Developer supplies a slip form for a 4.5-inch wedge shaped curb that is consistent with the City of Shafter standard 6- inch curb. Final dimensions are subject to City of Shafter approval. It is the intention of the City to develop a City curb and gutter standard based on this wedge shape curb to better comply with ADA regulations on home frontages. This modified curb shall be used on residential lot frontages only.
b. Mission Lakes Boulevard shall be constructed to its full flowline to flowline width along the tract boundary. Sidewalk, landscaping, and wall improvements may be deferred along the opposite side of the subject tract on Mission Lakes Boulevard until those areas are developed.
c. Pueblo Street shall be constructed to its full flowline to flowline width along the tract boundary. Sidewalk, landscaping, and wall improvements may be deferred along the west side of Pueblo Street until those areas are developed.

Page 478 of 510 ends

16 121. Should a street transition to another street with a ninety (90) degree turn occur, that transition shall be a street knuckle and shall be shown on the final tract map and in the street improvement plans.
122. Cul-de-sac and street knuckle dimensions and radii to conform to the Subdivision and Engineering Design Manual and/or as approved by the City Engineer. The use of off-set cul-de-sacs is approved provided they meet the requirements of the City of Shafter. 123. Street signs shall be installed per City standards as required by the City Engineer. 124. During construction, the Developer shall maintain the project, including all adjacent streets in a dust free condition. This condition applies at all times including weekends, evenings, and nighttime hours. During construction operations, cleanup of soil from the public roadways shall be required, if deemed necessary, by the City Engineer. 125. All utilities proposed under paving shall be installed prior to paving. Cover over utilities shall be at a depth as approved by the City Engineer.
126. Driveway approaches shall be constructed in a manner consistent with the requirements for residential approaches as set forth in the City’s Subdivision and Engineering Design Manual or as permitted by the City Engineer.
127. Sidewalk, including curb, shall be five (5) feet wide and shall be placed behind the curb, or as specified by the Mission Lakes Specific Plan. Transitions at intersections and wheelchair ramps shall be provided and installed per the City’s Subdivision and Engineering Design Manual.
128. Monument and monument covers shall be set per City Standards. 129. Temporary turnarounds, if required, including right-of-way, shall be granted, designed, and installed per the Subdivision and Engineering Design Standards. 130. Property line locations shall be marked with a chiseled line on the top of curb for all property lines. The location of all sewer laterals shall be indicated on the top or face of curb with a stamped “S”.
131. Street lighting shall be installed in accordance with the City Engineering and Subdivision Design Manual as directed by the City Engineer. Developer shall coordinate with Pacific Gas & Electric to ensure that the streetlights are established under the LS-2A rate schedule. 132. Secondary access easements shall be provided at the request of the City Engineer. Within any given phase of development, secondary access easements and improvements shall be provided in a manner approved by the City Engineer. Access roads shall be twenty (20) feet in width and shall consist of three (3) inches of Class II aggregate base over six (6) inches of native material compacted to 90% relative maximum density. 133. The Developer shall install a traffic signal at the intersection of 7th Standard Road and Lake Road if one does not exist. Prior to recordation of a final map, the Developer shall bond for

Page 479 of 510 ends

17 this traffic signal. The certificate of occupancy will not be issued to even a single lot in Tract No. 7463 until the traffic signal at this intersection is fully operational. The Developer shall disclose this to the prospective buyers.
134. The Developer shall provide a traffic study to check whether signal warrants are met for installation of a traffic signals at the intersections of Zerker Road with Mission Lakes Blvd north & south.
135. Waivers of direct access shall be dedicated and shown on the final map(s) for Tract No. 7463 as approved on the tentative map, subject to change by the request of the City Engineer. Said waivers of direct access shall also be shown on the individual plot plans during building permit application.
136. The Developer shall construct a secondary access road from the 7th Standard Road to Mission Lakes Boulevard (South) other than the one from Lake Road to Mission Lakes Boulevard to the Tract 7463’s access point at Artesia Lane, pursuant to the City of Shafter’s Engineering and Design Standards prior to the issuance of a building permit for the 200th dwelling unit within Tract 7463. Also, the Developer shall construct a secondary access point to Tract No. 7463 prior to the issuance of a building permit for the 200th dwelling unit within Tract No. 7463.

ENGINEERING: LANDSCAPING
137. Electrical Source for Landscaping:
a. Developer shall supply and install landscaping electrical services to power any and all required timers, solenoids, pumps, motorized equipment. Cabinets and meter pedestals shall be approved by the City of Shafter. Developer shall contract with Pacific, Gas & Electric the location of each pedestal and make all arrangements for them to deliver power at each location.
138. Water Source for Landscaping:
a. Landscaping water service point of connection shall be approved by the City Engineer. The water source shall be from the non-potable water system installed with the tract.
139. Landscaping Enclosure:
a. Landscaping timers, electrical service fuses, breakers, etc., shall be installed within a commercial grade landscaping enclosure.
b. Commercial grade landscaping enclosure shall be installed within the dedicated landscaping area adjacent to the water source and/or electrical source. c. Commercial grade landscaping enclosure shall be installed on a concrete foundation poured onto a minimum of six (6) inches of native subgrade compacted to 90% (or in accordance with manufacturer’s recommendations, whichever is more stringent).

Page 480 of 510 ends

18 d. The City of Shafter Subdivision and Design Manual requires a 110-volt duplex electrical service within the enclosure.
140. The Developer shall comply with all requirements for grading and erosion control, including the prevention of sedimentation or potential damage to off-site property. 141. Sleeves shall be placed under the proposed paving for landscape piping or low voltage electrical per the City Engineer.
142. Public landscaping throughout Tract 7463 shall be reviewed and approved by the City of Shafter prior to installation. Plans shall show the locations of water and electrical services necessary to serve the landscaping and lighting needs of these areas. 143. Landscape lots shall be equipped with a minimal number of benches, trash receptacles, water fountains, picnic tables, etc. as necessary. Details shall be worked out with the City during landscape plan review and approval.
144. Bollards or other effective obstructions shall be placed at the entrances of the landscape lots and wherever else they are deemed necessary by the City for pedestrian safety. 145. Developer shall dedicate the public landscaping lots to the City of Shafter at the time of recording of the final map.

ENGINEERING: SUBDIVISION IMPROVEMENT AGREEMENT
146. The Developer shall furnish the City of Shafter acceptable security to guarantee the construction of public improvements in accordance with all applicable provisions of the City of Shafter Municipal Code and the State Subdivision Map Act. The Developer may enter into a subdivision improvement agreement with the City of Shafter for public improvements that are not completed at the time of Final Map approval. The subdivision improvement agreement must be approved by the City Council and recorded with the Kern County Assessor-Recorder.

CALIFORNIA DEPARTMENT OF CONSERVATION – GEOLOGIC ENERGY

MANAGEMENT DIVISION (CDC-CALGEM)
147. Any wells located within Tract 7463, prior to, or during, development activities shall be tested by the Developer for liquid and gas leakage. Surveyed locations should be provided to CalGEM in Latitude and Longitude, NAD 83 decimal format. Any wells found leaking must be reported immediately to CalGEM by the Developer. 148. No well work may be performed on any oil, gas, or geothermal well by the Developer without written approval from CalGEM. Well work requiring approval includes, but is not limited to, mitigating leaking gas or other fluids from abandoned wells, modifications to well casings, and/or any other re-abandonment work. The Developer must acquire any required approval from CalGEM prior to commencing any well work. The Division also regulates the top of a plugged and abandoned well's minimum and maximum depth below

Page 481 of 510 ends

19 final grade. CCR §1723.5 states well casings shall be cut off at least 5 feet but no more than 10 feet below grade. If any well needs to be lowered or raised (i.e. casing cut down or casing riser added) to meet this regulation, the Developer must acquire the necessary permit from the Division before commencing work.
149. The Developer shall notify the appropriate authorities if soil containing significant amounts of hydrocarbons is discovered during development.
150. If during development activities, any wells are encountered that were not previously reviewed by CalGEM, the Developer/property owner is expected to immediately notify CalGEM’s construction site well review engineer in the Inland district office, and file for Division review an amended site plan with well casing diagrams. The District office will send a follow-up well evaluation letter to the property owner and local permitting agency.

NORTH OF THE RIVER RECREATION AND PARK DISTRICT
151. Prior to recordation of a final map, the subdivider shall dedicate land with free and clear title to North of the River Recreation and Park District based on a park land dedication requirement of 2.5 acres per 1,000 population in accordance with City of Shafter Municipal Code. If the number of dwelling units increases or decreases upon recordation of a final map(s), the park land requirements will change accordingly. Prior to recordation of a final map, the subdivider shall enter into an agreement with North of the River Recreation and Park District to implement and satisfy this condition. This subdivision is located within the boundaries of the North of the River Recreation and Park District. a. Subdivider shall dedicate 46.64 acres as planned park sites ‘A’, ‘B’ and PA-10. 152. Prior to recordation of any final map, the subdivider shall record a covenant on the property disclosing the requirement to dedicate/reserve a public park pursuant to a park agreement with the North of the River Recreation and Park District. Covenant shall be reviewed for approval by the North of the River Recreation and Park District prior to recordation. 153. All park sites shall be improved to North of the River Recreation and Park District requirements/Standards via an agreement with North of the River Recreation and Park District and the subdivider (“Developer Built Park Agreement”). Said agreement shall include the scope and timing of the development of the park site. This agreement shall be recorded with the Kern County Recorder’s Office to run with the land. The agreement shall be in place prior to the 250th residential unit permit on Tract 7461 and prior to the approval of the park plans by North of the River Recreation and Park District and the City of Shafter for Tract 7461. If an extension is needed, North of the River Recreation and Park District may exercise the option to record a covenant on the tracts of Mission Lakes stating the work towards the agreement and extending the ability to develop 100 residential units in Tract 7463 and prior to the approval of the park plans for Tract 7463 by North of the River Recreation and Park District and the City of Shafter.
154. Prior to recordation of any final map, the subdivider shall record a covenant on all lots of the subdivision disclosing the potential for light, glare, traffic and noise disturbances associated with the operations of the existing park site. Covenant shall be prepared,

Page 482 of 510 ends
← All documents from this meeting