City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 2-2
4. if backflow from a user’s premises occurs;
5. periodically, as identified in the City’s CCCMP required pursuant to State CCCPH section 3.1.4;
6. if the State Water Board requests a hazard assessment of a user’s premises; or
7. if the City concludes an existing hazard assessment may no longer accurately represent the degree of hazard.
f. A Cross-Connection Control Program Specialist must review or conduct each initial and follow-up hazard assessment pursuant to this section and make a written finding that, in the specialist’s judgment based on cross-connection control principles, the City’s hazard assessment properly identified all hazards at the time of the assessment, the appropriate degree of hazards, and the corresponding backflow protection.
2.2 Hazard Assessment Process
In order to assess each connection in the City’s water distribution system for potential cross connection the City will undertake assessments in the following phases. As part of the hazard assessment process the City has created a tracking system for the assessments made under the CCCMP, see CCCMP Appendix F.
Data will be gathered and logged into the assessment database in three phases. The assessment database record keeping policy is outlined in the CCCMP Section 9 and this is a new requirement so is not in the City’s Records Retention Policy. Phase 1 - All connections with existing backflow prevention assemblies at the meter connection
Phase 2 - All non-residential connections without backflow prevention assemblies at the meter connection
Phase 3 – Residential connections without backflow prevention assemblies at the meter connection
2.2.1 Phase 1 - All Connections with Backflow Protection The City currently has, as of May 14, 2025, 575 connections with backflow protection installed at the meter. For all connections with backflow protection the City will enter each address into the assessment tracking system indicating what type of BPA has been installed. The City’s Cross-Connection Control Program Specialist will review the data when entered into the assessment database to verify that an appropriate BPA has been installed on the meter connection. The Cross-Connection Control Program Specialist’s review date will be noted in the assessment database.
The City currently has 575 connections with backflow protection within the City. Based on the availability of the Cross-Connection Control Project Specialist the City has determined that this phase of the assessments can be completed within fourteen (14) years from the adoption of the City’s CCCMP.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 2-3
It is assumed that a Cross-Connection Control Program Specialist can process (1) site per available (2) hours, and the total number of annual Cross-Connection Control Program Specialist available hours is 85 hours/yr [5% of total annual 1,704 hours (2,080 total annual work hours - 24 hours for Floating holidays - 96 hours for City holidays - 120 hours for vacation - 96 hours for sick time - 40 hours for jury duty)] for a total of 42 sites per year per Cross-Connection Control Program Specialists assigned by the City to Cross-Connection Control. Therefore, the City will process up to 42 sites per year until all connections with an approved BPA have been assessed.
2.2.2 Phase 2 - All Non-Residential Connections without Backflow Protection The City currently has, as of May 14, 2025, 196 non-residential connections without backflow protection installed at the meter. For those non-residential connections without an approved BPA the City will provide a Site Assessment Form to provide information regarding onsite conditions which would necessitate the installation of an approved BPA at the meter connection.
The site assessment form to be completed by City staff may be found in CCCMP Appendix G.
It is assumed that a Cross-Connection Control Program Specialist can process (5) Site Assessment Forms per available hour, and the total number of annual Cross-Connection Control Program Specialist available hours is 85 hours/yr [5% of total annual 1,704 hours (2,080 total annual work hours - 24 hours for Floating holidays - 96 hours for City holidays - 120 hours for vacation - 96 hours for sick time - 40 hours for jury duty)] for a total of 425 Site Assessment Forms per year per Cross-Connection Control Program Specialists assigned by the City to Cross-Connection Control. It is also assumed that approximately (10%) of the non-residential Site Assessment Forms will be returned per distribution. Therefore, the City will distribute up to 4,250 Site Assessment Forms per year until all non-residential connections without an approved BPA have been assessed.
If the Cross-Connection Control Program Specialist determines that based on the Site Assessment Form that an approved BPA is not required, they will note that in the assessment database and the reason for not requiring an approved BPA. If the Cross-Connection Control Program Specialist determines that based on the Site Assessment Form that an approved BPA is required, they will note that in the assessment database and notify the non-residential customer that an approved BPA must be installed at the meter connection and note that determination in the assessment database.
The City has determined that this phase of the assessments can be completed within one (1) year from the completion of Phase 1.
If necessary, the City will follow up with the non-residential customers.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 2-4
Phase 3 – Residential Connections without Backflow Protection The City currently has, as of May 14, 2025, 4,489 residential connections without backflow protection installed at the meter. For those residential connections the City will assess each site by means of office-based tools such as:
City will utilize GIS system, and have excel spreadsheets available to export, and create an attribute for Specialist to sign, per each physical address or every meter. The following will supplement:
o Reviewing sites via Google Maps or other aerial photography software. o Reviewing tract maps to review blocks of residential customer in a common building area or zone.
o Using meter route maps or other billing information databases.
The office-based assessment will review sites for:
Private water wells
Other auxiliary water supplies
Sewer lift stations
Graywater systems
Pools
The office-based assessments would be conducted based on the available Cross-Connection Control Program Specialist hours to review the office-based databases and/or files. If the Cross-Connection Control Program Specialist determines that based on the officebased assessment that an approved BPA is not required, they will note that in the assessment database.
If the Cross-Connection Control Program Specialist determines that based on the officebased that an approved BPA is required, they will note that in the assessment database and notify the residential customer that an approved BPA must be installed at the meter connection and note that the customer has been contacted in the assessment database.
It is assumed that a Cross-Connection Control Program Specialist can perform assessments by means of office-based tools. Assuming that the total number of annual Cross-Connection Control Program Specialist available hours is 85 hours/yr [5% of total annual 1,704 hours (2,080 total annual work hours - 24 hours for Floating holidays - 96 hours for City holidays - 120 hours for vacation - 96 hours for sick time - 40 hours for jury duty)], and the Cross-Connection Control Program Specialist can review ten (10) sites per hour, therefore 850 residential sites can be assessed per year.
Based on the 4,489 residential connections without backflow protection installed at the meter, as of May 14, 2025, the City has determined that this phase of the assessments can be completed within five (5) years and three (3) months from the completion of Phase 2.
If necessary, the City will follow up with the residential customers.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 3-1
3 Operating Rules or Ordinances
In accordance with the State CCCPH, Section 3.1.3 (a)(1), and Section 3.1.4(b)(1) and Section
3.1.4 (b)(3),the City must have operating rules, ordinances, by-laws, or a resolution to implement the cross-connection program. The City must have legal authority to implement corrective actions in the event a water user fails to comply in a timely manner with the City’s provisions regarding the installation, inspection, field testing, or maintenance of BPAs required pursuant to this Section. Such corrective actions must include the City’s ability to perform at least one of the following:
Deny or discontinue water service to a water user;
Install, inspect, field test, and/or maintain a BPA at a water user’s premises; or Otherwise address in a timely manner a failure to comply with the City’s cross-connection control program.
The City’s backflow and cross-connection prevention requirements are contained in the City’s Municipal Code, Sections 13.04.02 through 13.04.130. A copy is attached as CCCMP Appendix C.
The City’s backflow and cross-connection prevention requirements are contained in the City’s Ordinance No. 376, Sections 1 through 2. A copy is attached as CCCMP Appendix D.
The City’s backflow and cross-connection prevention requirements are contained in the City’s Municipal Code, Sections 13.04.02 through 13.04.130, and City Ordinance No. 376, Sections 1 through 2. Copies are contained in CCCMP Appendices C and D.
City staff are currently in the process of updating the City’s Municipal Code, Sections 13.04.02 through 13.04.130, and City Ordinance No. 376, Sections 1 through 2, which will then be adopted by the Shafter City Council.
The first informational presentation of the updated Code and Ordinance will take place at the September 2, 2025 City Council Meeting. Then the updated Code and Ordinance will go to the next two subsequent City Council meetings.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 4-1
4 Backflow Prevention
In accordance with the State CCCPH, Section 3.1.3 (a)(4) and Section 3.2.2 – the City must ensure that actual and potential cross-connections are eliminated when possible or controlled by the installation of approved BPAs or AG’s consistent with the requirements of the Article 3 of the State CCCPH and the sections to follow. The City has 575 backflow assemblies installed at the water connections, and 541 onsite backflow assembles which are in the City’s tracking database and included in their annual backflow testing reports.
4.1 Backflow Prevention Requirements
(a) The City must ensure its distribution system is protected from backflow from identified hazards through the proper installation, continued operation, and field testing of an approved BPA (see Section 4.2 for installation and approved BPA criteria). When a DC is required or referenced in the State CCCPH, a DCDA or DCDA-II type of assembly may be substituted if appropriate. When an RP is required or referenced in the State CCCPH, an RPDA or RPDA-II type of assembly may be substituted if appropriate. (b) The BPA installed must be no less protective than that which is commensurate with the degree of hazard at a user premises, as specified in this section and as determined based on the results of the hazard assessment conducted pursuant to CCCMP Section 3. (c) Unless specified otherwise in this section, a City must, at all times, protect its distribution system from high hazard cross-connections (see CCCMP Appendix E for examples), through premises containment, through the use of AG(s) or RP(s). (1) Following State Water Board review and approval, the City may implement an alternate method of premises containment in lieu of a required AG provided that the proposed alternative would provide at least the same level of protection to public health.
(2) Following State Water Board review and approval, the City may accept internal protection in lieu of containment when premises containment is not feasible. (d) Except as otherwise allowed or prohibited in statute or in CCR Title 22, Division 4, Chapter 3, a swivel-ell may be used instead of an AG for premises containment protection when temporarily substituting tertiary recycled water use areas with potable water from a PWS if all the following criteria are met:
(1) the swivel-ell is approved by the State Water Board; (2) the City has a cross-connection control program, required pursuant to the State CCCPH Section 3.1.3, and the use and operation of the swivel-ell is described in the CCCMP required pursuant to the State CCCPH Section 3.1.4; (3) the design and construction-related requirements of the swivel-ell adheres to the criteria in CCCPH Appendix C;
(4) at least every 12 months, inspections are performed and documented to confirm
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 4-2
ongoing compliance with the design and construction-related requirements in CCCPH Appendix C;
(5) the RP used in conjunction with the swivel-ell is field tested and found to be functioning properly:
(A) immediately upon each switchover to potable water use, a visual inspection of the RP must be completed;
(B) within 72 hours of each switchover to potable water use, a field test must be completed; and
(C) at least every 12 weeks the use site is supplied with potable water; and (6) there is a legally binding agreement between the City and the entity supplying the recycled water, signed by those with relevant legal authority, which includes the following requirements:
(A) The State Water Board will be notified within 24 hours of all switchovers to or from potable water, will be given an estimate of the timeframe until the next switchover, and will be provided the results of the field testing required in paragraph (5);
(B) a trained representative of the City be present to supervise each switchover; and
(C) within seven days of each switchover, if requested by the State Water Board, the City will submit a written report describing compliance with this subsection, as well as potable and recycled water usage information. (e) Except as noted below, the City must ensure its distribution system is protected with no less than DC protection for a user premises with a fire protection system within ten years of the effective date of the State CCCPH.
(1) A high hazard cross-connection fire protection system, including but not limited to fire protection systems that may utilize chemical addition (e.g., wetting agents, foam, anti-freeze, corrosion inhibitor, etc.) or an auxiliary water supply, must have no less than RP protection.
(2) For existing fire protection systems that do not meet the State CCCPH, Section
3.2.2 (e)(3) or cannot install DC protection within ten years of the effective date of the State CCCPH, the City may propose in the CCCMP submitted for compliance with the State CCCPH Section 3.1.4:
(A) an alternative date; or
(B) an alternative method of backflow protection that provides at least the same level of protection to public health.
(3) A BPA is not necessary for a low hazard fire protection system on a residential user premises if the following criteria are satisfied:
(A) the user premises has only one service connection to the City; (B) a single service line onto the user premises exists that subsequently splits
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 4-3
on the property for domestic flow and fire protection system flow, such that the fire protection system may be isolated from the rest of the user premises;
(C) a single, water industry standard, water meter is provided to measure combined domestic flow and fire protection system flow; (D) the fire protection system is constructed of piping materials certified as meeting NSF/ANSI Standard 61; and
(E) the fire protection system’s piping is looped within the structure and is connected to one or more routinely used fixtures (such as a water closet) to prevent stagnant water.
(f) The State Water Board and the City may, at their discretion, require a water user to designate a user supervisor when the user premises has a multi-piping system that conveys various types of fluids and where changes in the piping system are frequently made. If a user supervisor is designated the following is required:
(1) The user supervisor is responsible for the avoidance of cross-connections during the installation, operation and maintenance of the water user’s pipelines and equipment. The user supervisor must be trained on the fluids used and backflow protection for the premise, and must inform the City of changes in piping, and maintain current contact information on file with the City; and (2) The City must include in the CCCMP required in the State CCCPH Section 3.1.4 the training and qualification requirements for user supervisors, identify the entity that will provide the user supervisor training, and frequency of any necessary recurring training. The training must adequately address the types of hazards and concerns typically found.
(g) Facilities producing, treating, storing, or distributing drinking water that are an approved water supply or water recycling plants as defined by CCR Title 22, Section 60301.710 must have proper internal protection from cross-connections to ensure that all drinking water produced and delivered to customers and workers at those facilities is free from unprotected cross-connections.
4.2 Backflow Prevention Assemblies
4.2.1 Standards for Types of Backflow Protection
(a) Each AG used for the CCCMP must meet the requirements in Table 1, Minimum Air Gaps for Generally used Plumbing Fixtures, page 4 of the American Society of Mechanical Engineers (ASME) A112.1.2- 2012(R2017).
(b) Each replaced or newly installed PVB, SVB, DC, and RP for protection of the PWS must be approved through both laboratory and field evaluation tests performed in accordance with at least one of the following:
(1) Standards found in Chapter 10 of the Manual of Cross-Connection Control, Tenth Edition, published by the University of Southern California Foundation for CrossConnection Control and Hydraulic Research;
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 4-4
(2) certification requirements for BPAs in the Standards of ASSE International current as of 2022 that include ASSE 1015-2021 for the DC, ASSE 1048-2021 for the DCDA & DCDA-11, ASSE 1013-2021 for the RP, and ASSE 1047-2021; (3) for the RPDA & RPDA-II and must have the 1YT mark.
(c) BPAs must not be modified following approval granted under Section 4.2.1(b). The City requires that BPA testers notify the City if a water user or City-owned BPA has been modified from the CCCMP Section 4.2.1(b) approval.
4.2.2 Installation Criteria for Backflow Protection
(a) For AGs, the following is required:
(1) The receiving water container must be located on the water user’s premises at the water user’s service connection unless an alternate location has been approved by the City;
(2) all piping between the water user’s service connection and the discharge location of the receiving water container must be above finished grade and be accessible for visual inspection unless an alternative piping configuration is approved by the City;
(3) the City must ensure that the AG specified in the State CCCPH Section 3.3.1 (a) has been installed; and
(4) any new air gap installation at a user’s service connection must be reviewed and approved by the State Water Board prior to installation. (b) RPs must be installed such that the lowest point of an assembly is a minimum of twelve inches above grade, and a maximum of thirty-six inches above the finished grade, unless an alternative is approved by the PWS.
(c) DCs installed or replaced after the adoption of the State CCCPH must be installed according to the State CCCPH Section 3.3.2 (b). Below ground installation can be considered if approved by the City where it determines no alternative options are available.
(d) A PVB or SVB must be installed at a minimum of twelve inches above all downstream piping and outlets.
(e) SVBs may not be used for premises containment. PVBs may only be used for roadway right of way irrigation systems as premises containment where there is no potential for backpressure.
(f) A RP or DC installed after the adoption of the State CCCPH must have a minimum side clearance of twelve inches, except that a minimum side clearance of twenty-four inches must be provided on the side of the assembly that contains the test cocks. The City may approve alternate clearances providing that there is adequate clearance for field testing and maintenance.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 4-5
(g) Backflow protection must be located as close as practical to the water user’s service connection unless one or more alternative locations have been approved by the City. If internal protection is provided in lieu of premises containment, the City must obtain access to the user premises and must ensure that the on-site protection meets the requirements of this Chapter for installation, field testing, and inspections. (h) Each BPA and air gap separation must be accessible for field testing, inspection, and maintenance.
(i) If an air gap feed is not available then an RP shall be installed on a Temporary Fire Hydrant Meters.
They City’s Standard Specification and/or drawings for each type of BPA is contained in Appendix J.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 5-1
5 Non-Testable Devices
5.1 Non-testable backflow preventer testing procedures
There are non-testable backflow preventer devices under City ownership or administration.
Hose-bibb vacuum breakers is an example of the most common types of non-testable backflow prevention devices for the City.
Table 5 -1 Location of Non-Testable backflow prevention device Location of Non-Testable Backflow Preventer
Location Air Gap
Atmospheric
Vacuum
Breaker
Hose-bibb
Vacuum
Breaker
Dual Check
Valve Identification Potential Onsite Hazard
Tank 1 No No Yes No None
Tank 2 and
Well 14 No No Yes No Sodium Hypochlorite (NaCIO)
Tank 3 No No Yes No Diesel
Tank 4 and
Well 18 No No Yes No Sodium Hypochlorite (NaCIO), Diesel Tank 5 No No Yes No None
Well 11 Yes No Yes No Sodium Hypochlorite (NaCIO)
Well 12 No No Yes No None
Well 16 Yes No Yes No Sodium Hypochlorite (NaCIO)
Well 17 Yes No Yes No Sodium Hypochlorite (NaCIO)
Well 20 Yes No Yes No Sodium Hypochlorite (NaCIO)
Well 21 Yes No Yes No Sodium Hypochlorite (NaCIO)
The above are inspected by the City’s staff (production, maintenance, specialists, etc.) Monday through Friday.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 6-1
6 Certified Backflow Prevention Assembly Testers and
Certified Cross-Connection Control Program Specialists
In accordance with the State CCCPH, Section 3.1.3 (a)(5), Section 3.1.4 (b)(6), and Section
3.4.1 – the City must ensure that each BPA required by the CCCMP to protect the City’s domestic water system is field tested by a person with valid certification from a certifying organization recognized by the State Water Board pursuant to the State’s CCCPH.
6.1 Backflow Tester Certification
All backflow testers testing within the service area of the City must provide evidence of current certification from a State Water Board-recognized organization certifying backflow prevention assembly testers. Certifying organizations must be recognized by the State Water Board in accordance with requirements of the State CCCPH and ISO/IEC 17024. Beginning on July 1, 2025, only those testers with a valid certification from a State Water Board recognized certifying organization shall be allowed to test BPA’s in the City’s service area, certifications from any other entity will be considered invalid.
6.1.1 Backflow Tester List
Backflow Testers must provide evidence of certification from a State Water Board recognized certifying organization and provide current calibration information for all test equipment. Both the certification and calibration information is submitted to online to the City’s backflow management system, which is Backflow Solutions, Inc. (BSI). BSI verifies the backflow testers information and maintains a list of City approved Backflow Testers. Backflow Testers must register online at https://bisonline.com and submit the above information.
Backflow Testers must hold a current City of Shafter business license in order to perform backflow testing in the City.
The City has one (1) staff who is certified by a State Water Board recognized certifying organization as Backflow Testers, but the City staff does not perform any testing.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 6-2
6.2 Cross-Connection Control Program Specialist Certification All Cross-Connection Control Program Specialists, used by the City pursuant to the requirements of the State CCCPH, shall have valid certification from a State Water Board recognized certifying organization, which complies with the State CCCPH, will be considered to be a State Water Board recognized certifying organization.
Beginning three years after the effective date of the State CCCPH, only those Cross-Connection Control Program Specialists with a valid certification from a State Water Board recognized certifying organization shall satisfy the requirements of the State CCCPH. Certifications obtained by organizations that do not meet the requirements of the State CCCPH will be invalid.
The City has two (2) staff who are certified by a State Water Board recognized certifying organization as Cross-Connection Control Program Specialists. These Cross-Connection Control Program Specialists are shown in Table 6-1 below:
Table 6 -1 Certified Cross-Connection Control Program Specialists Name Agency Address Phone No. Email Address Certification No. Certification Expiration Date
Marcos Torres City of Shafter 720 Commerce Way
Shafter, CA 93263 (661) 746-5004 [email protected] 03202 1/31/2026 Joseph T. O'Brien City of Shafter 720 Commerce Way
Shafter, CA 93263 (661) 746-5054 [email protected] 03624 6/30/2026
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 7-1
7 Backflow Incident Response, Reporting and Notification In accordance with the State CCCPH, Section 3.1.3(a)(8), Section 3.1.4 (b)(7), and Section 3.5.2 the City has developed and implemented procedures for investigating and responding to suspected or actual backflow incidents. The procedure for responding to backflow incidents, reporting any incidents, and reporting those incidents, will be:
7.1 Backflow Incident Response Procedure
In the event that a suspected backflow incident occurs in the City, the City’s response will include, but not limited to, the following:
(a) Consideration of complaints or reports of changes in water quality as possible incidents of backflow;
(b) Water quality sampling and pressure recording; and
(c) Documentation of the investigation, and any response and follow-up activities.
7.2 Backflow Incident Notification
In the event that a backflow incident occurs the Cross-Connection Control Program Coordinator will provide the following notification:
(a) The Cross-Connection Control Program Coordinator will notify the State Water Board and Kern County Public Health of any known or suspected incident of backflow within 24 hours of the determination. If required by the State Water Board, the City will issue a Tier 1 public notification pursuant to CCR, Title 22, Section 64463.1. (b) If required by the State Water Board, the City will submit, by a date specified by the State Water Board, a written incident report describing the details and affected area of the backflow incident, the actions taken by the City in response to the backflow incident, and the follow up actions to prevent future backflow incidents.
The written incident report form is in CCCMP Appendix I.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 8-1
8 Cross-Connection Control Program Coordinator
In accordance with the State CCCPH, Section 3.1.3 (a)(2) and Section 3.1.4 (b)(8), the City must designate at least one individual involved in the development of and be responsible for the reporting, tracking, and other administration duties of its cross-connection control program.
Further, for public water systems with 3,000 service connections or more the Cross-Connection Control Program Coordinator must be a Cross-Connection Control Program Specialist.
As of May 14, 2025, the City’s water system includes 5,000 domestic water connections.
Therefore, the City must have a Cross-Connection Control Program Coordinator and they must be a Cross-Connection Control Program Specialist.
The City’s Cross-Connection Control Program Coordinator is:
Marcos Torres
Deputy Public Works Director - Operations
City of Shafter
720 Commerce Way, Shafter, CA 93263
Phone:(661) 746-5004 - Office
Email: [email protected]
Certification Number: 03202
Certifying Entity: California-Nevada Section, American Water Works Association (CA-NV Section)
Expiration Date: 1/31/2026
The City’s Cross-Connection Control Program Specialist is:
Marcos Torres
Deputy Public Works Director - Operations
City of Shafter
720 Commerce Way, Shafter, CA 93263
Phone:(661) 746-5004 - Office
Email: [email protected]
Certification Number: 03202
Certifying Entity: California-Nevada Section, American Water Works Association (CA-NV Section)
Expiration Date: 1/31/2026
The City’s CCCMP was developed in consultation with their Cross-Connection Control Program Specialist(s) because the City’s domestic water system has more than 1,000 service connections.
The City’s designated Cross-Connection Control Program Specialist can be contacted within one hour, per the requirement of the State CCCPH for a PWS with 3,000 or more service connections.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 8-2
8.1 Cross-Connection Control Program Specialist Designee In the event the City’s Cross-Connection Control Program Specialist is not available due to vacation, sickness, or other reason, the duties of the Cross-Connection Control Program Coordinator and Specialist will be carried out by:
The City’s Cross-Connection Control Program Coordinator and Specialist is:
Joseph T. O'Brien
Utilities Manager
City of Shafter
720 Commerce Way, Shafter, CA 93263
Phone (661) 746-5054 - Office
Email: [email protected]
Certification Number: 03624
Certifying Entity: California-Nevada Section, American Water Works Association (CA-NV Section)
Expiration Date: 6/30/2026
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 9-1
9 Recordkeeping
In accordance with the State CCCPH, Section 3.1.3(a)(7) and Section 3.1.4 (b)(9) the City has developed and implemented a recordkeeping system for:
1. Backflow prevention assemblies (BPA)
2. Cross-connection information
3. Commercial/Industrial and Residential site assessments This recordkeeping system complies with the State CCCPH section 3.5.1.
9.1 Records Retained
The City maintains the following records via a Geographical Information System (GIS) and an internal database:
(a) The hazard assessments for each user premise, conducted pursuant to CCCPH section
3.2.1 (Hazard Assessment).
(b) For each BPA, the associated hazard or application, location, owner, type, manufacturer and model, size, and serial number. City does not record installation date. (c) For each AG installation, the associated hazard or application and the location, owner, and as-built plans of the AG.
(d) Results of all BPA field testing, AG inspections, swivel-ell inspections, and field tests for the previous three calendar years, including the name, test date, repair date, and certification number of the backflow prevention assembly tester for each BPA field test and AG and swivel-ell.
(e) Repairs made to, or replacement or relocation of, BPAs for the previous three calendar years.
(f) The most current cross-connection tests (e.g., shutdown test, dye test), if recycled water use on the premise. The City does not currently have a recycled water system as of May 14, 2025.
(g) If a User Supervisor is designated for a user premise, the current contact information for the User Supervisor and Water User, and any applicable training and qualifications as described by State CCCPH section 3.2.2(f). City does not require any user supervisors for its customers as of May 14, 2025.
(h) Descriptions and follow-up actions related to all backflow incidents. (i) If any portion of the cross-connection control program is carried out under contract or
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 9-2
agreement, a copy of the current contract or agreement. (j) The current Cross-Connection Control Management Plan as required in the State CCCPH Section 3.1.4.
(k) Any public outreach or education materials issued as required in the State CCCPH section 3.1.3.(a)(7) for the previous three calendar years. (l) All records retained by the City will be made available to the State Water Board upon request.
(m) Records of Commercial/Industrial site assessments.
(n) Records of Residential site assessments.
9.2 Recordkeeping Policy and Procedures
The City does not have a written retention policy regarding backflow nor hazard assessments.
The procedures outlined in Section 9 will become the City’s written retention policy and are generally described below:
9.2.1 City Backflow Capture
Backflow test notices are generated by City’s backflow management system, which is Backflow Solutions, Inc. (BSI)
Test notices are distributed:
By direct mail as standard procedure, or email when available Test results returned:
Uploaded through BSI portal
Record storage method:
Internal tracking system through BSI
Data stored:
On BSI cloud portal
Person responsible for storage:
Marcos Torres
Deputy Public Works Director – Operations
720 Commerce Way, Shafter, CA 93263
[email protected]
(661) 746-5004
Record retention:
Stored indefinitely on BSI and kept indefinitely as an attribute to the customer.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 9-3
9.2.2 Phase 1: All Connections with Backflow Protection Electronic assessment document which has been reviewed and signed by the Cross-Connection Control Program Specialist in Laserfiche has the following process:
If no action is required:
o Storage location:
Electronic copies are filed in a Laserfiche repository on the City’s internal IT servers.
o The Cross-Connection Control Program Specialist is responsible for the filing.
Marcos Torres
Deputy Public Works Director – Operations
720 Commerce Way, Shafter, CA 93263
[email protected]
(661) 746-5004
o Record retained for:
Files are retained indefinitely.
o Record disposal method after retained time limit:
Electronic files are saved in perpetuity.
o Assessment storage method:
By customer address.
o Assessment electronic storage location:
The City’s internal IT servers are utilized as an electronic storage location where the data from the assessment is stored.
If action is required:
o Notification generated by Cross-Connection Control Program Specialist that a backflow is required.
o Notification mailed to residential customer.
o Specialist follows up in 30 days to verify that backflow has been installed. o Action noted in assessment database.
o Action noted by the Cross-Connection Control Program Specialist, Marcos Torres
Deputy Public Works Director – Operations
720 Commerce Way, Shafter, CA 93263
[email protected]
(661) 746-5004
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 9-4
9.2.3 Phase 2: All Non-Residential Connections without Backflow Protection Electronic site assessment document is completed electronically by City personnel. The site assessment document is reviewed by the Cross-Connection Control Program Specialist and signed in Laserfiche, data is stored electronically by the Cross-Connection Control Program Specialist.
Electronic site assessment document which has been reviewed and signed by the CrossConnection Control Program Specialist in Laserfiche has the following process:
o Storage location:
Electronic copies are filed in a Laserfiche repository on the City’s internal IT servers.
o How filed:
Filed electronically on the City’s internal computer server. o Responsible person for the filing:
Marcos Torres
Deputy Public Works Director – Operations
720 Commerce Way, Shafter, CA 93263
[email protected]
(661) 746-5004
o How long is document retained:
Files are retained indefinitely.
o How file is disposed of after the holding period:
Electronic files are saved in perpetuity.
o Responsible person for disposal of the expired document:
Marcos Torres
Deputy Public Works Director – Operations
720 Commerce Way, Shafter, CA 93263
[email protected]
(661) 746-5004
If no action is required:
o Storage location:
Electronic copies are filed in a Laserfiche repository on the City’s internal IT servers.
o The Cross-Connection Control Program Specialist is responsible for the filing.
Marcos Torres
Deputy Public Works Director – Operations
720 Commerce Way, Shafter, CA 93263
[email protected]
(661) 746-5004
o Record retained for:
Files are retained indefinitely.
o Record disposal method after retained time limit:
Electronic files are saved in perpetuity.
o Assessment storage method:
By customer address.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 9-5
o Assessment electronic storage location:
The City’s internal IT servers are utilized as an electronic storage location where the data from the assessment is stored.
If action is required:
o Notification generated by Cross-Connection Control Program Specialist that a backflow is required.
o Notification mailed to residential customer.
o Specialist follows up in 30 days to verify that backflow has been installed. o Action noted in assessment database.
o Action noted by the Cross-Connection Control Program Specialist, Marcos Torres
Deputy Public Works Director – Operations
720 Commerce Way, Shafter, CA 93263
[email protected]
(661) 746-5004
9.2.4 Phase 3: Residential Connections without Backflow Protection Residential assessments conducted in accordance with Section 2. Electronic assessment document submitted as a pdf which is reviewed by the Cross-Connection Control Program Specialist and signed in Laserfiche, data is stored electronically by the Cross-Connection Control Program Specialist.
If no action is required:
o Storage location:
Electronic copies are filed in a Laserfiche repository on the City’s internal IT servers.
o The Cross-Connection Control Program Specialist is responsible for the filing.
Marcos Torres
Deputy Public Works Director – Operations
720 Commerce Way, Shafter, CA 93263
[email protected]
(661) 746-5004
o Record retained for:
Files are retained indefinitely.
o Record disposal method after retained time limit:
Electronic files are saved in perpetuity.
o Assessment storage method:
By customer address.
o Assessment electronic storage location:
The City’s internal IT servers are utilized as an electronic storage location where the data from the assessment is stored.
If action is required:
o Notification generated by Cross-Connection Control Program Specialist that a backflow is required.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 9-6
o Notification mailed to residential customer.
o Specialist follows up in 90 days to verify that backflow has been installed. o Action noted in assessment database.
o Action noted by the Cross-Connection Control Program Specialist, Marcos Torres
Deputy Public Works Director – Operations
720 Commerce Way, Shafter, CA 93263
[email protected]
(661) 746-5004
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 10-1
10 User Supervisors
In accordance with the State CCCPH, Section 3.2.2 (3)(f),The State Water Board and City may, at their discretion, require a water user to designate a user supervisor when the user premises has a multi-piping system that conveys various types of fluids and where changes in the piping system are frequently made. If a user supervisor is designated the following is required:
(1) The user supervisor is responsible for the avoidance of cross-connections during the installation, operation and maintenance of the water user’s pipelines and equipment. The user supervisor must be trained on the fluids used and backflow protection for the premise, and must inform the City of changes in piping, and maintain current contact information on file with the City; and
(2) The City must include in the CCCMP required in CCCPH Section 3.1.4 the training and qualification requirements for user supervisors if required by the State Water Board or City, identify the entity that will provide the user supervisor training, and frequency of any necessary recurring training. The training must adequately address the types of hazards and concerns typically found.
The City has not required any user supervisors for use sites within the City.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 11-1
11 Backflow Prevention Assembly Testing and Reporting
In accordance with the State CCCPH, Section 3.1.3 (a)(6) – the City must ensure that each BPA required by the CCCMP to protect the City’s domestic water system is field tested. The City must develop and implement a procedure for ensuring all BPAs are field tested, inspected, and maintained and AG’s are inspected and maintained in accordance with the State CCCPH, Section 3.3.3.
1. All BPAs installed in the City in compliance with it CCCMP must be field tested following installation, repair, depressurization for winterizing, or permanent relocation. All required field testing must be performed by certified backflow prevention assembly tester.
2. BPAs must be field tested at least annually. The State CCCPH does not preclude the City, the State Water Board, or a local health agency from requiring more frequent field testing for premises with high hazard cross-connection or BPA at increased risk of testing failure.
3. Air-gap separations must be visually inspected at least annually by a certified backflow prevention assembly tester or certified as a Cross-Connection Control Program Specialist.
4. The City must receive passing field tests before providing continuous service to a water user with a newly installed BPA.
5. BPAs that fail the field test must be repaired or replaced within 30 days of notification of the failure by the City. Extensions may be allowed by the City if low hazard and customer is working with City to replace.
Backflow prevention assembly testers must notify the City within one day if a backflow incident or an unprotected cross-connection is observed at the BPA or prior to the user premises during field testing. The City will immediately investigate and discontinue service to the user premises if a backflow incident is confirmed, and water service will not be restored to that user premises until the City receives a confirmation of a passing BPA field test from a backflow prevention assembly tester and the assembly is protecting the City.
11.1 Backflow Testing Notification Process
For each BPA in the City’s water distribution system, an annual notice that the BPA must be tested in accordance with the CCCMP will be sent to the user by BSI via mail.
Upon receipt, the Owner will have 30 days to have the BPA tested by a certified backflow assembly tester, and the test results submitted to the City via BSI Online.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 11-2
Each water user with a BPA on the service connection must comply with the following schedule in order to be in compliance with the CCCMP and continue to receive water service from the City.
First notice – the first annual notice of BPA testing required is sent to the user. First notices are sent out by BSI to all premises with BPA via mail. Users then have 30 days to respond via BSI Online.
Second notice – if not resolved after 30 days from the date the first notice was sent to the user; a second notice will be sent to the user by BSI via mail. Users then have 15 days to respond via BSI Online.
Third notice– if not resolved after 15 days from the date the second notice was sent to the user; a third notice will be sent to the user by BSI via mail with a shutoff notice. How long to respond and how to respond (return mail, email, both?). Users then have 30 days to respond via BSI Online.
Fourth notice – if not resolved after 30 days from the date the third notice was sent to the user; City staff will install a door hangar with 72 hours notice to turnoff. Termination of water service – if the user fails to provide the required test results 72 hours after the final notice; the water service will be terminated.
11.2 Damaged, missing, or improperly installed backflow prevention assemblies.
In the event that a backflow prevention assembly is missing (or stolen), installed incorrectly, illegally modified, or tampered with, the City will notify the user that the BPA is missing (or stolen), installed incorrectly, illegally modified, or tampered with, and provide them 30 days to replace, repair, or re-install the BPA.
Although no written standard operating procedure exists, BPAs that fail the field test must be repaired or replaced within 30 days of notification of the failure by the City. Extensions may be allowed by the City if low hazard and customer is working with City to replace.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 12-1
12 Public Outreach and Education
In accordance with State CCCPH, Section 3.1.3 (a)(9) and Section 3.1.4 (b)(12) – the City has developed a cross-connection control public outreach and education program that is intended to educate staff, customers, and the community about backflow protection and crossconnection control.
The City has a designated Public Information Officer (PIO) that provides a point of contact for the City regarding the City’s cross-connection control and backflow protection program and other water related issues. The City’s PIO is:
Michael James
Public Works Director
661-746-5004
[email protected]
Public Outreach to educate the City’s customers on backflow and cross-connection control include information on backflow and cross-connections on the City’s website which is:
https://www.shafter.com/70/Water
This CCCMP will be accessible through the City’s website, which is:
https://www.shafter.com/70/Water
In addition, backflow and cross-connection prevention may be distributed by other means, including but not limited to, periodic water bill inserts, information pamphlet distribution, new customer documentation, emails, and additions to the City’s Annual Water Quality Report, which for Reporting Year 2024 will be accessible through the City’s website, which is:
https://www.shafter.com/70/Water
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025 13-1
13 Local Entity Coordination
In accordance with the State CCCPH, Section 3.1.3 (a)(10) and Section 3.1.4 (b)(13) The City must coordinate with applicable local entities that are involved in either cross-connection control or public health protection to ensure hazard assessments can be performed, appropriate backflow protection is provided and provide assistance in the investigation of backflow incidents.
Local entities may include but are not limited to plumbing, permitting, or health officials, law enforcement, fire departments, maintenance, and public and private entities.
For the City the local entities which are involved in cross-connection control include, but are not limited to:
City of Shafter Building Department
Dennis Fidler
336 Pacific Ave, Shafter, CA 93263
Office: 661-746-5026
[email protected]
Coordination includes: Implementation of the City’s cross-connection control and backflow program.
Kern County Fire Station 32
325 Sunset Ave, Shafter, CA 93263
Office: 661-746-3933
Coordination includes: Implementation of the City’s cross-connection control and backflow program.
State Water Resources Control Board - Division of Drinking Water Jesse Dhaliwal, Tehachapi District (District 19) Engineer 4925 Commerce Dr., Ste 120, Bakersfield, CA 93309
Office: 661-335-7318; Work Cell: 661-333-4065
[email protected]
Coordination includes: Review of the City’s cross-connection control and backflow program.
State Water Resources Control Board - Division of Drinking Water Jeff Densmore, South Central Section (Section IV) Chief 1001 I St, 24th Floor, Sacramento, CA 95814
Office: 805-566-9021; Work Cell: 805-570-7830
[email protected]
Coordination includes: Review of the City’s cross-connection control and backflow program.
Kern County Environmental Health Division
Jeffrey Marshall, Director of Environmental Health
2700 M St, Ste 300, Bakersfield, CA 93301
Office: 661-862-8775; Work Cell: 661-246-7915
[email protected]
Coordination includes: Review of the City’s cross-connection control and backflow program.
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix A
What is a Cross Connection?
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix A
Background on Backflow Protection and Cross-Connection Control A.1 What is a Cross-Connection?
A cross-connection is an interconnection between a potable water supply and a non- potable source via any actual or potential connection or structural arrangement between a PWS and any source or distribution system containing liquid, gas, or other substances not from an approved water supply. Bypass arrangements, jumper connections, removable sections, swivel or change-over devices and other temporary or permanent devices through which, or because of which backflow can occur are considered to be cross-connections.1 The State CCCPH includes acceptable installation criteria for swivel-ell and other types of backflow prevention assemblies (BPAs) to prevent backflow.
Backflow is the undesired or unintended reversal of flow of water and/or other liquids, gases, or other substances into a PWS’s distribution system or approved water supply.
The presence of a cross-connection represents a location in a distribution system through which backflow of contaminants or pollutants can occur. Backflow occurs when a non-potable source is at a greater pressure than the potable water distribution system. Backflow can occur from either backsiphonage or backpressure. Backsiphonage occurs when a non-potable source enters the drinking water supply due to negative (i.e., sub-atmospheric) distribution system pressure. Backpressure occurs when the pressure from a non-potable source exceeds the pressure in the potable water distribution system.
Backsiphonage may be caused by a variety of circumstances, such as main breaks, flushing, pump failure, or emergency firefighting water demand. Backpressure may occur when heating, cooling, waste disposal, or industrial manufacturing systems are connected to potable supplies and the pressure in the external system exceeds the pressure in the distribution system. Both situations act to change the direction of water, which normally flows from the distribution system to the customer, so that non-potable substances from industrial, commercial, or residential premises flows back into the distribution system through a cross-connection.
Cross-connections are not limited to industrial or commercial facilities. Submerged inlets are found on many common plumbing fixtures and are sometimes necessary features of the fixtures if they are to function properly. Examples of this type of design are siphon-jet urinals or water closets, flushing rim slop sinks, and dental cuspidors.
Older bathtubs and lavatories may have supply inlets below the flood level rims, but modern sanitary design has minimized or eliminated this cross-connection in new fixtures. Chemical and industrial process vats sometimes have submerged inlets where the water pressure is used as an aid in diffusion, dispersion, and agitation of the vat contents. Even though a supply pipe may be installed above a vat, backsiphonage can still occur. Siphon action has been shown to raise a liquid in a pipe such as water almost 34 feet. Some submerged inlets are difficult to control, including those which are not apparent until a significant change in water level occurs or where
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
a supply may be conveniently extended below the liquid surface by means of a hose or auxiliary piping. A submerged inlet may be created in numerous ways, and its detection may be difficult.
Chemical and biological contaminants have caused illness and deaths during known incidents of backflow, with contamination affecting several service connections, and the number of incidents reported is believed to be a small percentage of the total number of backflow incidents that actually occur. The public health risk from cross-connections and backflow is a function of a variety of factors including cross-connection and backflow occurrence and type and amount of contaminants.
A.2 Purpose of a Cross-Connection Control Program
The purpose of a cross-connection control program is to prevent the occurrence of backflow into a PWS’s distribution system in order to protect customers from contamination or pollution from any on-site hazards. Properly installed and maintained BPAs, devices or methods provide protection against the threat posed by many conditions typically found on a user’s premise.
The use of approved BPAs ensures that the appropriate performance evaluation of the assembly was conducted. It is important and required by the State CCCPH to select and properly install an approved BPA that is capable of protecting the distribution system from the hazard identified.
The success of a program depends on individuals that are knowledgeable about crossconnection control to identify actual and potential hazards, apply principles of backflow protection and prevention, and implement cross-connection control policies and procedures. A successful program will have ongoing surveillance of a PWS to ensure BPAs, devices or methods are working and identify new hazards or changes in the distribution system. Certified specialists are needed to properly evaluate the degree of hazard that exists in the distribution system. Hazards typically identified in distribution systems along with the required level of protection are specified in Chapter 3 of the State CCCPH.
A.3 Notes on Applicability of the Cross-Connection Control Policy Handbook The State CCCPH provides the basis for regulating the use and management of crossconnection control programs and BPAs in PWSs, and related requirements for supporting programs and policies. Activities or uses outside of the scope of the authority of the State Water Board to regulate PWSs are not regulated by the State CCCPH, including California Plumbing Code requirements and definitions not related to PWSs.
Recycled water cross-connection control installations and programs for the purposes of protecting the recycled water supply are not regulated by the State CCCPH, although a PWS that uses recycled water is regulated by the State CCCPH to ensure that a PWS’s drinking water system has adequate backflow protection from a recycled water system.
Water systems that do not meet the definition of a PWS (e.g., “State Small Water Systems” under CCR Title 22, Article 3) are not regulated by the CCCPH, although they may need to comply with the California Plumbing Code, local health agencies, and other laws or entities. __________________________________________
1 California Department of Health Services (DHS), Public Water Supply Branch. (1988). Guidance Manual for Cross-Connection Control Program (Green Manual). California Department of Health Services
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix B
Assembly Bill 1671 (2017, Chapter 533)
Assembly Bill 1180 (2019, Chapter 455)
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Assembly Bill No. 1671
CHAPTER 533
An act to amend Section 116810 of, and to add Sections 116407 and 116555.5 to, the Health and Safety Code, relating to drinking water. [Approved by Governor October 6, 2017. Filed with Secretary of State October 6, 2017.]
legislative counsel’s digest
AB 1671, Caballero. Backflow protection and cross-connection controls:
standards.
(1) Existing law, the California Safe Drinking Water Act, requires the State Water Resources Control Board to administer provisions relating to the regulation of drinking water to protect public health, including, but not limited to, conducting research, studies, and demonstration projects relating to the provision of a dependable, safe supply of drinking water, enforcing the federal Safe Drinking Water Act, adopting regulations, and conducting studies and investigations to assess the quality of private domestic water wells. Existing law makes certain violations of the act a misdemeanor.
Existing law requires any person who owns a public water system to ensure that the system does certain things, including, but not limited to, that it will not be subject to backflow under normal operating conditions. Existing law, to ensure that testing and maintenance of backflow prevention devices are performed by persons qualified to do testing and maintenance, authorizes local health officers to maintain programs for certification of backflow prevention device testers and requires the certification program to be consistent with backflow protection regulations adopted by the state board. A violation of these provisions, or an order by a local health officer pursuant to these provisions, is a misdemeanor.
This bill would require a public water system to implement a crossconnection control program that complies with, and would require the certification program to be consistent with, applicable regulations and the standards described in (2).
(2) Existing regulations establish standards for a backflow prevention device and cross-connection control.
This bill, on or before January 1, 2020, would require the state board to adopt standards for backflow protection and cross-connection control and would authorize the state board to do so through the adoption of a policy handbook, as specified. By authorizing the state board to adopt standards, the violation of which would be a crime, the bill would create a new crime and impose a state-mandated local program.
94
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Ch. 533 — 2 —
(3) The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
The people of the State of California do enact as follows:
SECTION 1. Section 116407 is added to the Health and Safety Code, to read:
116407. (a) On or before January 1, 2020, the state board shall adopt standards for backflow protection and cross-connection control.
(b) The state board may implement subdivision (a) through the adoption of a policy handbook that is not subject to the requirements of Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code. The policy handbook shall include standards for backflow protection and cross-connection control. In developing the standards and any amendments to those standards, the state board shall consult with state and local agencies and other persons whom the state board has identified as having expertise in the subject of backflow protection and cross-connection control.
The state board shall hold at least two public hearings before adopting the policy handbook. The policy handbook shall be posted on the board’s Internet Web site. (c) (1) Upon the effective date of a policy handbook adopted by the state board pursuant to subdivision (b), the regulations set forth in Article 1 (commencing with Section 7583) and Article 2 (commencing with Section 7601) of Group 4 of Subchapter 1 of Chapter 5 of Division 1 of Title 17 of the California Code of Regulations shall become inoperative, and, 90 days thereafter, are repealed, unless the state board makes a determination not to repeal a specific regulation. (2) If the state board determines not to repeal a specific regulation pursuant to paragraph (1), the state board shall provide to the Office of Administrative Law and the Secretary of State written notice of its determination, including identification of the specific regulation that is not repealed. That regulation, upon the provision of that written notice to the Office of Administrative Law and the Secretary of State, shall become operative.
SEC. 2. Section 116555.5 is added to the Health and Safety Code, to read:
116555.5. A public water system shall implement a cross-connection control program that complies with applicable regulations and with standards adopted by the board pursuant to Section 116407.
SEC. 3. Section 116810 of the Health and Safety Code is amended to read:
116810. To ensure that testing and maintenance of backflow prevention devices are performed by persons qualified to do testing and maintenance, 94
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
— 3 — Ch. 533
local health officers may maintain programs for certification of backflow prevention device testers. The local health officer may suspend, revoke, or refuse to renew the certificate of a tester, if, after a hearing before the local health officer or his or her designee, the local health officer or his or her designee finds that the tester has practiced fraud or deception or has displayed gross negligence or misconduct in the performance of his or her duties as a certified backflow prevention device tester. The local health officer may collect fees from certified testers to offset the cost of the certification program provided pursuant to this section. The certification standards shall be consistent with standards adopted by the state board pursuant to Section 116407 and any other applicable backflow protection regulations.
SEC. 4. No reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIII B of the California Constitution.
94
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Assembly Bill No. 1180
CHAPTER 455
An act to amend Section 116407 of the Health and Safety Code, and to add Section 13521.2 to the Water Code, relating to water.
[Approved by Governor October 2, 2019. Filed with Secretary of State October 2, 2019.]
legislative counsel’s digest
AB 1180, Friedman. Water: recycled water.
(1) Existing law, the California Safe Drinking Water Act, requires the State Water Resources Control Board to administer provisions relating to the regulation of drinking water to protect public health. Existing law requires, on or before January 1, 2020, the state board to adopt standards for backflow protection and cross-connection control through the adoption of a policy handbook, as specified.
This bill would require that handbook to include provisions for the use of a swivel or changeover device to supply potable water to a dual-plumbed system during an interruption in recycled water service.
(2) Existing law requires the state board to establish uniform statewide recycling criteria for each varying type of use of recycled water where the use involves the protection of public health.
This bill would require the state board, on or before January 1, 2023, as specified, to update the uniform statewide criteria for nonpotable recycled water uses.
The people of the State of California do enact as follows:
SECTION 1. The Legislature finds and declares all of the following:
(a) On December 11, 2018, the State Water Resources Control Board unanimously adopted an amendment to the policy for water quality control for recycled water, which included a goal to increase the use of recycled water in the state from 714,000 acre-feet per year in 2015 to 1,500,000 acre-feet per year by 2020 and 2,500,000 acre-feet per year by 2030.
(b) Section 13521 of the Water Code requires the state board to establish uniform statewide recycling criteria for each varying type of use of recycled water where the use involves the protection of public health.
(c) The regulations establishing the uniform statewide criteria for recycled water uses are set forth in Chapter 3 (commencing with Section 60301.050) of Division 4 of Title 22 of the California Code of Regulations. The regulations that pertain to nonpotable recycled water uses have not been updated since 2000. 95
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Ch. 455 — 2 —
(d) The regulations relating to backflow protection and cross-connection control for recycled water are set forth in Article 1 (commencing with Section 7583) and Article 2 (commencing with Section 7601) of Group 4 of Subchapter 1 of Chapter 5 of Division 1 of Title 17 of the California Code of Regulations. These regulations have not been updated since 1987.
(e) Section 1 of Chapter 533 of the Statutes of 2017 (Assembly Bill 1671 of the 2017–18 Regular Session) requires, on or before January 1, 2020, the state board to adopt backflow protection and cross-connection control standards and authorizes their implementation through a policy handbook.
(f) In order to maximize the amount of recycled water California can safely use for beneficial purposes, it is necessary to update the uniform statewide criteria for nonpotable recycled water uses and specify certain associated backflow protection and cross-connection control provisions.
SEC. 2. Section 116407 of the Health and Safety Code is amended to read:
116407. (a) On or before January 1, 2020, the state board shall adopt standards for backflow protection and cross-connection control.
(b) (1) The state board may implement subdivision (a) through the adoption of a policy handbook that is not subject to the requirements of Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code. The policy handbook shall include standards for backflow protection and cross-connection control. In developing the standards and any amendments to those standards, the state board shall consult with state and local agencies and other persons whom the state board has identified as having expertise in the subject of backflow protection and cross-connection control. The state board shall hold at least two public hearings before adopting the policy handbook. The policy handbook shall be posted on the board’s internet website. (2) (A) The policy handbook described in this subdivision shall include provisions for the use of a swivel or changeover device to supply potable water to a dual-plumbed system during an interruption in recycled water service. (B) The use of a swivel or changeover device shall be consistent with any notification and backflow protection provisions contained in the policy handbook. (c) (1) Upon the effective date of a policy handbook adopted by the state board pursuant to subdivision (b), the regulations set forth in Article 1 (commencing with Section 7583) and Article 2 (commencing with Section 7601) of Group 4 of Subchapter 1 of Chapter 5 of Division 1 of Title 17 of the California Code of Regulations shall become inoperative, and, 90 days thereafter, are repealed, unless the state board makes a determination not to repeal a specific regulation. (2) If the state board determines not to repeal a specific regulation pursuant to paragraph (1), the state board shall provide to the Office of Administrative Law and the Secretary of State written notice of its determination, including identification of the specific regulation that is not repealed. That regulation, upon the provision of that written notice to the
95
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
— 3 — Ch. 455
Office of Administrative Law and the Secretary of State, shall become operative.
SEC. 3. Section 13521.2 is added to the Water Code, to read:
13521.2. (a) On or before January 1, 2023, the state board shall update the uniform statewide criteria for nonpotable recycled water uses established in Chapter 3 (commencing with Section 60301.050) of Division 4 of Title 22 of the California Code of Regulations. The deadline imposed by this section is mandatory only if the Legislature has appropriated sufficient funds, as determined by the executive director of the state board, in the annual Budget Act or otherwise to cover the state board’s costs associated with the performance of the duties imposed by this section. (b) For purposes of the update to the uniform statewide criteria for nonpotable recycled water uses described in subdivision (a), the state board shall adopt a regulation that incorporates by reference the criteria and applicable backflow protection provisions, including the provisions for the use of a swivel or changeover device for dual-plumbed systems, that are contained in the most recently adopted version of the policy handbook adopted pursuant to Section 116407 of the Health and Safety Code and any future versions of the policy handbook.
O
95
City of Shafter Cross-Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix C
Municipal Code, Sections 13.04.02 through
13.04.130
Title 13 - PUBLIC SERVICES
Chapter 13.04 - WATER SERVICE
Article II. Control of Backflow and Cross-Connections
Shafter, California, Code of Ordinances Created: 2025-04-02 08:09:26 [EST] (Supp. No. 23, Update 1)
Article II. Control of Backflow and Cross-Connections
13.04.020 Purpose.
The purpose of this article is:
A. To protect the public potable water supply of the city from the possibility of contamination or pollution by isolating within its customers' internal distribution system(s) or its customers' internal distribution system(s) or its customers' private water system(s) such contaminants or pollutants which could backflow or back-siphon into the public water supply system; and B. To promote the elimination or control of existing cross-connections, actual or potential, between its customers' in-plant potable water system(s) and nonpotable water systems, plumbing fixtures and industrial piping systems; and
C. To provide for the maintenance of a continuing program of cross-connections control which will systematically and effectively prevent the contamination or pollution of all potable water systems.
D. To comply with the State Water Resources Control Board’s Cross-Connection Control Policy Handbook (“CCCPH”). To the extent that any provision within this chapter conflicts with the CCCPH, as may be amended from time to time, the CCCPH shall control.
(Ord. XXX § 1, 2025; Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.01 (a)))
13.04.030 Definitions.
Except as otherwise specified herein, the terms used in this chapter shall have the meanings ascribed to them in Section 3.1.1. of the CCCPH.
A. “Director” shall refer to the director of public works for the city of Shafter or his designee. (Ord. XXX § 1, 2025; Ord. 376 § 1 (part), 1988: prior code § 10-4(6-7.02(b)—(t)))
13.04.040 Makeup of water system.
A. The water system shall be considered as made up of two parts:
1. The city system; and
2. The customer system.
B. The city system shall consist of the source facilities and the distribution system; and shall include all those facilities of the water system under the complete control of the city up to the point where the customer's system begins.
C. The source shall include all components of the facilities utilized in the production, treatment, storage and delivery of water to the distribution system.
D. The distribution system shall include the network of conduits used for the delivery of water from the source to the customer's system.
Created: 2025-04-02 08:09:26 [EST]
(Supp. No. 23, Update 1)
E. The customer's system shall include those parts of the facilities beyond the termination of the city distribution system which are utilized in conveying city delivered domestic water to points of use. (Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.03))
13.04.050 Water service connection—Installation and maintenance.
No water service connection to any premises shall be installed or maintained unless the water supply is protected as required by state laws and regulation and this article. Service of water to any premises shall be discontinued if a prevention device required by this article is not installed, tested and maintained, or if it is found that a backflow prevention device has been removed, bypassed, or if an unprotected cross-connection exists on the premises. Service will not be restored until such conditions or defects are corrected. (Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.04))
13.04.060 Inspection of customer's system.
The customer's system should be open for inspection at all reasonable times to authorized representatives of the public works water division to determine whether cross-connections or other structural or sanitary hazards, including violations of these regulations, exist. When such a condition becomes known, the director shall deny or immediately discontinue service to the premises by providing for a physical break in the service line until the customer has corrected the condition(s) in conformance with state and city statutes relating to plumbing and water supplies and the regulations adopted pursuant thereto. If the customer refuses to allow authorized representatives of the public works water division to inspect the system, the customer shall be required to install an approved backflow prevention device.
(Ord. XXX § 1, 2025; Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.05))
13.04.070 Backflow prevention devices—Required—Where and when.
An approved backflow prevention device shall also be installed on each service line to a customer's water system at or near the property line or immediately inside the building being served; but in all cases, before the first branch line leading off the service line wherever the following conditions exist:
A. In the case of premises having an auxiliary water supply which is not or may not be of safe bacteriological or chemical quality and which is not acceptable as an additional source by the director, the city water system shall be protected against backflow from the premises by installing a backflow prevention device in the service line appropriate to the degree of hazard.
B. In the case of premises on which any industrial fluids or any other objectionable substance is handled in such a fashion as to create an actual or potential hazard to the city water system, the city system shall be protected against backflow from the premises by installing a backflow prevention device in the service line appropriate to the degree of hazard. This shall include the handling of process waters and waters originating from the city system which have been subject to deterioration in quality.
C. In the case of premises having (1) internal cross-connections that cannot be permanently corrected and controlled, or (2) intricate plumbing and piping arrangements or where entry to all portions of the premises is not readily accessible for inspection purposes, making it impracticable or impossible to ascertain whether or not dangerous cross-connections exist, the city water system shall be protected against backflow from the premises by installing a backflow prevention device in the service line.
Created: 2025-04-02 08:09:26 [EST]
(Supp. No. 23, Update 1)
D. In the case of premises identified in Appendix D, or whenever any other hazard is identified by the director following a hazard assessment.
(Ord. XXX § 1, 2025; Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.06))
13.04.080 Backflow prevention devices—Required—Type.
The type of protective device required under Section 13.04.070(A), (B) and (C) shall depend upon the degree of hazard which exists as follows:
A. In the case of any premises where there is an auxiliary water supply as stated in Section 13.04.070(A), (B) and (C) and it is not subject to any of the following rules, the city water system shall be protected by an approved air-gap separation or an approved reduced pressure principle backflow prevention device.
B. In the case of any premises where there is water or substance that would be objectionable but not hazardous to health, if introduced into the city water system, the city water system shall be protected by an approved double check valve assembly.
C. In the case of any premises where there is any material dangerous to health which is handled in such a fashion as to create an actual or potential hazard to the city water system, the city water system shall be protected by an approved air-gap separation or an approved reduced pressure principle backflow prevention device. Examples of premises where these conditions will exist include sewage treatment plants, sewage pumping stations, chemical manufacturing plants, hospitals, mortuaries and plating plants.
D. In the case of any premises where there are uncontrolled cross-connections, either actual or potential, the city water system shall be protected by an approved air-gap separation or an approved reduced pressure principle backflow prevention device at the service connection.
E. In the case of any premises where, because of security requirements or other prohibitions or restrictions it is impossible or impractical to make a complete cross-connection survey or hazard assessment, the city water system shall be protected against backflow or back-siphonage from the premises by the installation of a backflow prevention device in the service line. In this case, maximum protection will be required; that is, an approved air-gap separation or an approved reduced pressure principle backflow prevention device shall be installed in each service to the premises. (Ord. XXX § 1, 2025; Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.07))
13.04.090 Backflow prevention devices—Approval.
A. Any backflow prevention device required herein shall be of model and size approved by the director. The term "approved backflow prevention device" means a device that has been manufactured in full conformance with the standards established by the American Water Works Association entitled "AWWA C506-78 Standards for Reduced Pressure Principle and Double Check Valve Backflow Prevention Devices:" and have met completely the laboratory and field performance specifications of the Foundation for CrossConnection Control and Hydraulic Research of the University of Southern California established by Specifications of Backflow Prevention Devices—#69-2 dated March, 1969 or the most current issue. Said AWWA and FCCC&HR standards and specifications have been adopted by the director. Final approval shall be evidenced by a certificate of approval issued by an approved testing laboratory certifying full compliance with said AWWA standards and FCCC&HR specifications.
B. The following testing laboratory has been qualified by the director to test and certify backflow preventers:
Created: 2025-04-02 08:09:26 [EST]
(Supp. No. 23, Update 1)
Foundation for Cross-Connection
Control & Hydraulic Research
University of Southern California
University Park
Los Angeles, CA 90008
Testing laboratories other than the laboratory listed above will be added to an approved list as they are qualified by the director.
C. Backflow preventers which may be subjected to back pressure or back siphonage that have been fully tested and have been granted a certificate of approval by said qualified laboratory and are listed on the laboratory's current list of approved devices may be used without further test or qualifications. (Ord. XXX § 1, 2025; Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.08))
13.04.100 Backflow prevention devices—Inspection and testing.
It shall be the duty of the customer-user at any premises where backflow prevention devices are installed to have certified inspections and operational tests made at least once per year. In those instances where the director deems the hazard to be great enough, he may require certified inspections at more frequent intervals. These inspections and tests shall be at the expense of the water user and shall be performed by the device manufacturer's representative, by public works water division personnel or by a certified tester approved by the director. It shall be the duty of the director to see that these timely tests are made. The customer-user shall notify the director in advance when the tests are to be undertaken so that he or his representative may witness the tests if so desired. These devices shall be repaired, overhauled or replaced within 30 days at the expense of the customer-user whenever the devices are found to be defective. Records of such tests, repairs and overhauls shall be kept and made available to the director.
(Ord. XXX § 1, 2025; Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.09))
13.04.110 User Supervisor.
In accordance with the CCCPH, Section 3.2.2 (3)(f), the State Water Resources Control Board or the City may, at their discretion, require a customer to designate a user supervisor when the user premises has a multi-piping system that conveys various types of fluids and where changes in the piping system are frequently made. The user supervisor is responsible for the avoidance of cross-connections during the installation, operation and maintenance of the customer’s pipelines and equipment. The user supervisor must be trained on the fluids used and backflow protection for the premise, and must inform the City of changes in piping, and maintain current contact information on file with the City.
(Ord. XXX § 1, 2025; Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.10))
13.04.120 Water system protection.
The director of public works shall be responsible for the protection of the public potable water distribution system from contamination or pollution due to the backflow or back-siphonage of contaminants or pollutants through the water service connection. If, in the judgment of the director, an approved backflow prevention device is required, at the city's water service connection to any customer's premises, for the safety of the water system, the director is his designated agent shall give notice in writing to the customer to install such an approved
Created: 2025-04-02 08:09:26 [EST]
(Supp. No. 23, Update 1)
backflow prevention device at each service connection to his premises. The customer shall immediately install such approved device or devices at his own expense; and failure, refusal or inability on the part of the customer to install the device or devices immediately shall constitute a ground for discontinuing water service to the premises until such device or devices have been properly installed. (Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.01(b)))
13.04.130 Implementation of program—Enforcement of provisions.
The director is invested with the authority and responsibility for the implementation of an effective crossconnection control program and for enforcement of the provisions of this article. (Ord. XXX § 1, 2025; Ord. 376 § 1 (part), 1988: prior code § 4-10(6-7.02(a)))
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix D
Ordinance No. 376, Sections 1 through 2
ORDINANCE NO. 376
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SHAFTER ADDING CHAPTER IO TO TITLE 4 OF THE SHAFTER MUNICIPAL CODE RELATING TO CONTROL OF BACKFLOI. I AND CROSS- CONNECTIONS The City Council of the City of Shafter does ordain as
fol lows:
Seclion l: Chapter l0 is hereby added to Title 4 of
the Shafter Municipal Code to read as follows:
Chapter 10
CONTROL OF BACKFLOI, I AND CROSS- CONNECTIONS
Sec. 6-7.01. Cross-connection control -- General Policy. a) The purpose of this ordinance is:
l) To protect the public potable water supply
of the City of Shafter from the possibilitv of contamination or pollution by isolating within its customers' internal distribution s.ystem ( s) or its customers' internal distribution system ( s) or its customers' private water system ( s) such contaminates of pollutants which could backflow or back-siphon into the public water supply system; and
Ql To promote the elimination or control of
existing cross- connections, actual or potential, between its customers' in-plant potable water s.ystem ( s) and non- potable water systems, plumbing fixtures and industrial piping s.ystems¡ and
3) To provide for the maintenance of a continuing program of cross-connections control which will s.ystematically and effectively prevent the contamination or pollution of all potable water systems.
l
ORDTNANCE NO. 1 Page 192 of 318
b) Responsibility. The Director of Public Works
shall be responsible for the protection of the public potable water distribution s.ystem from contamination or pollution due to the backflow or back- siphonage of contaminants or pollutants through the water service connection. If, in the judgment of said Director, an approved backflow prevention device is required, at the City's water service connection to any customer' s premises, for the safety of the water s.ystem, the Director or his designated agent shall give notice in writing to said customer to install such an approved backflow prevention device at each service connection to his premises. The customer shall irunediately install such approved device or devices at his own expensei and failure, refusal or inability on the part of the customer to install said device or devices i¡rmediately shall constitute a ground for discontinuing water service to the premises until such device or devices have been properly installed.
Sec. 6-7.02. Definitions.
a) Di rector of Publ i c l,lorks. The Di rector of Pubt i c I'lorks, hereafter called Director, in charge of the l,later Department of the City of Shafter is invested with the authority and responsibilitv for the implementation of an effective cross-connection control program and for enforcement of the provisions of this ordinance. b) Approved. Accepted by the Director as meeting
an applicable specification stated or cited in this ordinance; 2-
(4) In cooperation with the State Water Resources Control Board Division of Drinking Water, City’s major goal is to ensure the distribution of a safe and potable water supply to all domestic water users. In order for the City to achieve this goal, a Cross-Connection Control Management Plan (CCCMP) is being developed with an effective date of July 1, 2025. The City’s CCCMP was developed pursuant to the requirements set forth in the CrossConnection Control Policy Handbook (CCCPH) which replaced State of California Administrative Code Title 17, Sections §7583 through §7605 and applies to all State of California Public Water Systems, as defined in California’s Health and Safety Code (CHSC, section 116275(h))
Add Item #4 below
13 L4
16 16
1?
18 19
20 2L
22 23
24 2S
26 27
28 t
2 3
4 6
6 or as sultable for the ppoposjt use.
onor
c) AuxillíIrv ll¿Ll...t lt,'lrlll. Ar¡.\,water surrnlv
available Eo the prernises
veclpu'
oLlrer. than the City,s nnor.
mavinclude
ric potable water sup¡rly. Trrese atrxrlrarv waters
warer from a¡rotrrer purrric not¿¡ble water srrlr>ry o,:
Ilny naCurnl source( s) such as; well, spri¡¡, river, . 9r.renm,, artror, etc. , or t'usecl lyAters,, or ,,inclt¡.sCrial
sewafersf lui<1s,,. T.llt,
may
be pollutetl or corrr:;¡¡ri¡r;¡tetr, of trrcy may .
l>e
sourccover
obJectionat¡ re and co¡lsEitutc í¡^ .racce¡rtatrre water wr¡rcr¡ trre crtv tr'es ¡roL rrr,¡e s;a¡rit¿¡rv c'¡¡r-rol. d) Rackflow. r'he flow of; w¿rter or <¡t.e.r rir¡trirrs, 1plpes
mlxÈures or subscances u¡tder pressrrre 1r¡to tl¡e r!í s LrlbrrLin¡ orsources
of a poÈable waEer su¡r¡rly svstenr from a¡rv $orrrce
other than iro L¡rterrrler. t sorrrce.
e) Bacl<- siilroug_ o. L'rre flow of waLer or . ilrerllqul< le' mlxÈures or sul¡stnnr: es lrrto trre rllstrlbutl.¡ ¡ rines of a Potal¡le htaLer sup¡l1y sys terrr f ¡:.r,¡ a..y sor¡rce other tlla¡r i ts lnt'ended sources causect by tlre sutltlen reduct. i.on of nresr;.¡.e in the poEable rvaUã'r stro¡rly syst.erx.
ßacl,. f lorv I'rjì-Lqlllf . A clevlce or ¡¡earJ. s dcs J ltoflne.<prevenc backf low or l¡aclc_sr tpllonnge.
Âtr-Ga¿. llhe urrol>structe<l verEical. rlir¡tarì(:e
throug. E^e f ree atr¡ros¡rrrere r:c,rjrv.r:rr Lrrc rowcs t- o[re¡1i ¡¡¡, f-¡:,rn any'pipe or fauceÈ su¡,plyin¡, w¿ltr_,r to a t¿¡nlr., nlumbi'¡ 1 fizt-ure, or oÈher device ancl Erre f lootr level rinr of saicr ves.ser. Ârr approvetl air-gap sl¡alI be at lcast- tl'ubl.e tlre dia'rcter .F.' the supply pipe ' nreAr;rrecr verticn l ry, arr've tlre ton of t!re rim of the vessel; aDcl, in tr() e;rfie less; l_lr;rrr olte ir¡ch. l.,lrq:n 3-
7 I
9 10
I1
t2
2L
22 P3
L
2 4
6 an air-gap 1s used at the . sel:v.i ce conrìec t Íon Lo preverì t tlre conEnml¡ ratlon or pollrr,tlcrn oJ. I.lrc Cit.y,s ur¡table v¡atçr syrìLern, arr emergency by-pass shall be r.'st:allccr arou¡.¡ d tr¡e air-¡¡,.p s),sEem and an approved' recruced pres$rtr:* ¡
bnfnscalled
rr.-r.crple rrevice shnlr.
l¡r Ehe by-pass system.
h) Re<luced l)ressrri: J'ri-rrc!rr,..-tf.!gg.. An assenrbry of Èwo lndependently operarirr¡¡ :rp¡rrovecl checr< valves witrr arr auEomaEically oPeractng differe¡rt:l¿rl rcllef valve between the Lv¡o cl¡eck valves, tlghcly closing shut-of f v¡rlves on elrher sirle of the check varves , prus propr:rr y rocated tes t cocks f c¡r the Èesclng of the checlc and relief valves. Tlre enclre assernbl! shall meeE the clesl¡irr a¡tcl perfrlrrnance sl)eclficaElons arrcl åpproval of a reco¡','lz,ed n¡¡cl c.lty apnrovecl testl'¡,. afÌ(¡¡ì(..v for l¡aclcf low ¡r¡qye¡rLior¡ ¡ ts{¡(,lrrl¡ I lr.:;. I.ltc dcvlce s;lrall r¡ner.aËe Eo maintai¡ t the pressure 1n tlre z.otre bctwee^ tlre tv'o cll*ck valves at a level less tlrarr t.hc l)ressure on the Cirv r.¡¡rLcr supply slcle of the <levice.
L
cessatlon of. normal f lov¡ the
Pressure beEween the clreck vrlves slrall be Iess tha¡r t.llc supply pressure. In case of l.eal:a6e of eíther c¡eck valve, Èhe differentlal rellef valve sh¿rll (r¡)erate Lo rnalntain. t¡ls reduced nressure by cllschar¡i.rr¡. to the aLnosnhere. l.ll¡en the lnlet pressure ts t r"/o pountls ¡) er: s(luare inclr or less, the rellef valve sharl open Eo Lhe atrnos¡rhere. To be annrovert, these devlces must be reaclily accessil¡ le Jlor ln-line nnainEenance and EesÈing arrd be l¡¡stalle<l i¡ a location where no parE of Ehe device will bc. subrrrer:¡ 1etl.
6 7
I
9 10
11 1e
1 l4
15 16
t?
L8
19 20
24 25
26 ûPage 195 of 318
I
a
4 6
6 7
I
9 10
1L
t2
13 1.¡
15 16
t?
18 19
20 21
22 23
24 26
26 i) Double g.!rggL-\ t.1þq 4i-lst¡rÞb. An assenrr¡ lv of yclosing
rwolntlepe. tlc.tly o¡)ernttrrg nf )¡) rove(r cr¡ccri valves wrrt¡ Li¡rrL l. shuc-off valve.s o. eacrr s i tre of trre ctreck valves , plus properry lócated tesL cor.. ks for Erre testrrrp, of eacrr check valve. The e¡rÈire ass**blv srrarr ¡ neet the desi¡n and performance speclflcati<.1¡ts a¡¡tl ¡rt)l)rovírl of a recogrì izetl a¡r<l' acity approvecl ÈesEin¡', al',encv llor backf 1¡¡rv prevenÈlr: n ¿ evlces.
To be approvecl these tlevices nrLrst tre reaclÍly accesslble for in- line maintenance a¡r<l tes t i rrg.
J ) cont.arni.natlon. lfenns an lnr¡:alr¡nent of tlre quallty of the potaËle wacer by rìevra[', e, irrdusLrlal f luids or rraste llqulcls, com¡rourrds or otrrcrr rrraterrnls¡ Lo n dc¡rce r¡rrrcrr creates all accual hazarcl ro Llre ¡rrrbl ic heal cl¡ rhrou¡ rh ooisoning or Èhrough the sprea.rl of <llsenr;e.
k) Cross-cotrtrccliott. Ârry nlrysical corìnecti6n ot
arrangement of ptprng or f rxttrres between tr.¡o otherr.¡rse separaEe ptpin¡' systents one of rvlrich contains poLable v¡ater and Ëhe other trotr-¡roEable watcr o¡: ln<lus trl¡rl f lulds of, ( lrectlonable safeEy, Èhrou¡', h whrch, or rrecause of rvrrich, bacrcflow or tracl"- slphonage may occur into tlre ¡rotablc water svsIem.
A Ltacer servlce coll¡ìecLLon betwac¡r ír publtc lrotal¡le rvater dlstrlbuÈlon sysLem and a cusl-onrcr'.s w¿rter dlsErlbutlon . sysËem whlch ls cross-connectecl to ã cor¡ta¡nlnatecl f lxcure, lrrclustrial fluld system or wlch a potenLtal. ly co¡ltarnl¡ rated sunrrly or auxlllar¡l vrat'er systern, co¡1st:itt¡Les one type of cross- co¡¡ectlon.
Ocher Eypes of cross-co¡ulections include cor¡necLorj suclr as 5-
9 10
11 2
16 17
L8
19 20
2L
22 23
24 25
26 I
2 3
4 s'rrng connecÈions' removabler sectiors, forrr-vrav plun vaIves, srrools ' durrurry sectrorrs;, c.rf ¡ri ¡ r., ' wrvel <¡r c:lran¡r,e-over: < levices, sliding rnulÈiporE Eube, solirl cìotì¡ìectÍons, eCc. f ) qross_Se!lllgg!igl¡q--: _
rtonbeÈwee¡ conrro I lc<l. A conrrecr a potable. water sys t-ern arrcl. a norì_¡ r<ltab temwithla waEer .sys
an a¡rprovecl backf loro p.ou.,,.,tior¡ tlevicc r¡ronerlv in¡; talledthaE r'¡i1l contlnuously aff.rrr r:rle Drotectirn corìmensurace wiCh Èhe de¡ree of hazard.
m) Cross- cprr. ccÇi., n . cl¡ltrol
einsÈallaElon J¡-y_.c.¡.!tai¡r're¡rt . ?.,'
of an a¡r¡rroved l>acr<fr.ow prevenLion cJevice at tlrewaÈer servr-ce connectron to n.y cusLoner,s premises where iÈ isphyslcally yeli¡
a.cl eco¡romrcally r.rrfe¿rst>1e Lo fl.ncr an<r nermanentl. ninate or control ¡ rll actrn l. or r)ote¡ttia L cro.ss-co¡ rrìectionswtclitn re1¡
the customer. rs vrarer svsLer'; or, f t srralr mea¡r L! tscallaÈlon of an al)l)rove( t l¡¡rr:l<flow ¡)
üheservÍce rcve¡ltlon rlevlce ()¡.r
llne leading to ancl sr¡¡)l)lyi.¡ a ¡rortlon of a crst.rner,s waÈer eysÈem where tlrere are actu¿rl or nocerìtial cross-cornections whlch cannot be effectively cl i¡,rirratecl or colltrolletl at thepolnE of cross-cont¡ection. r) Ilazard, DS¡rge o!
l) llazard llcalr'. rlrry con<llElo¡r, ctcvice,
or pracLLce ln tl¡e water su¡r¡rlv sy.ster¡ ancl iEs oDeration vr'lch could create, or ln Èhe .juc. l¡,,rrrenÈ of the DirecEor nray create a danger Lo trre hea r rh ancr we r r- be in¡ o F tlre wa ter co¡rsumer' Àn example of a he¡l tlr lrazar< l
i.s ít strrrctrrral clefecË,
f nclucllrrg cross-con¡ìectio¡rs, t. ¿ ì r,¡;¡tcr str¡r¡rIy. 6 6
7 B
I3
14 1.6
6-
6 7
I
9 10
t.t
l2
I
14 L6
16 t?
18 t9
20 8¡.
22 23
24 26
26 27
28 I
2 3
4 2) Ilazard plrrntbin¡. L ¡r Iu¡rrb j.¡ìp._ Lyt) e
Cross-cOnÌlecLÍo¡r' lrt a.cot.tsunrcr' s
Irotat¡le w¿rtcr s;,r.stenr tlrat has
troÈ been properly pror-ecLe< r b'¡ ¿r vacuum r>r*aker, .âÍr-fiap seParaElo¡¡ or bàckf low ¡rrevetttl ot¡ tlcvice. rr¡rnrorectc<l 1typelurnbin¡,
cros s - co¡ìnect ro¡rs are co.s r <re red to bc a hea r t rr ha 2...r rd . 3) llazarcl I'ollutio.al. Ârr actual .r:
potentlal threat Èo the plrys tcal l)rol)ertle:i of: Llre vrater sysÈem .
or
to the poLabiltty oI tlre public or the corì.sr'r(:r,s
potable water systern but whiclr woulcl corìstit-t¡te a ¡¡uisflnce or be aesthetlcally objecLio¡rable or coul< l causr clanra¡. e to the sys Èem or its aPptlrce¡ ìances , l>trt woul<l lr<¡t brl <larr¡.erous to health 4) llnzarcl system. A¡r actual or note:ntiaI
threaE of severe darna¡ ie to trre ¡rrrysrcal ï)r()r)erLrcs of trrc City's ¡ rotable wate. r system or Llrc, cc)nsunrer'. s not¿rtrlc, ,¡aLer syste¡ n or of ¿r polltrEl-on or (:orìtiìnrlrraLlor¡ r.rlrlcl¡ woulcl lrnve a proÈracCed affecL orì tl'¡e r¡uallty oll tlre ¡rotable wrter i¡t the sys tem.
o) rnclus trlal Fl.g¡!r _l'¡_t.e[. ruy system co¡rtainrng, a f lutd or solutlon wlrlch may l.¡e clremicallv, blolo¡,.lcal ly or otherwise contamlnated or nrrlluced i¡r a form or.concenLraÈlon such as would constit.te a trealth, svste¡n, Dollut:lonal or plumblng hazarcl lf lntrotluct. erl lr¡to an a¡r¡rr:overJ wacer sr:¡rnIy.
This mny lncludc, but rìoL bc rrnrj.tert to: pollucecl or contamtnated rvater.s; a1l types of r)r:occss waLers antl ,,userl waLers,, origlnaÈin¡, f rom. the publtc potable water svstcrn which nay have deÈeriorated ln sanitary r¡rrallty; cllernicals in fr¡icr forml plaLlrrg aclcls atrd nll:¿rlj.cs, circulatccl coolln¡ r vrnLers con¡recte<l to an ol)en cOol.in¡', toi:r:r arìtl/t>t c6olin¡ tovrers 7
t
7 I
9 10
1t
L2
I3
l4
16 16
17 18
l9
80 91
22 23
24 25
26 27
I
2 o
4 6
6 starririzerrwlc.
that Bre c'ernicall. y or triol0¡iicn l1y treatcrr or
toxrc subsLa. ces;,
asfrom
co¡lta¡.r¡rated .aLural water..; . such
wells ' sprr'ngs, s treams , rivers , bays , ha.r bors , seas , lrrlgatlo¡r ""
ua,i" or systcnìs,, ete.; of.l.s, Ílases, p.lvcerlne,
paraf fins, caustic ancl acrcl s'ruLlo¡rs a.cr c¡Eher
ancrgaseous
liquicr
flutds used rn r¡rdustrial or other purposes or F.ctr
f lre-f tghctng pur¡)oses.
p) pollution. Ì{c¿rrr.s the presctìce of .any [ nsubsÈance ( orei¡. organlc, Lnor¡¡anic, or biolo¡lcal) i' water r,¡'ic'
orlmpalr
tends co de¡¡racle lcs c¡traltty so arì Lo co¡stlrute ír tt¿tzar< l t'e usefurness or qualltv of t^e water to a de¡ rreewhlch does not create a¡ì nctu;r.l lrnzartl thbut to l.tre publlc lre¡rl.
whlch does aclvers ley an<J unreasonabl, v ¿¡f fect such w¿ìters f or dt¡rnes t lc use .
q) water -- t-'otalr! g-. Ârry water: which, accor.cling.
Èo recog,.lzed sEandards is s,.rf e for hu¡na¡l (: onsu¡ nrrtron. r) I,tater -- ltorrpgt-abLg. I.,ater r.,hlch ls not safe for human consumPElotr or wlrlch 1s of questf. r:nable potal)t1icv. s) l'later -- servL-qg--çgurgs!l!l]-g-.
endofThe Eerrni¡ ral
a servLce connecLr- o. from trre cit-y,s ¡rotable r.¡at.er.svsr-en; i'e', where Èhe ctty loses Jtrr:iscllctl-on ancl sanitary corrtrol over the water at rts ¡ rolnt r f: rre 1r very to the cus tonrer , s waEer system. rf a neter ls r¡rstarlecr at the e.rr r:f .Lhe scrúlce connecÈlo¡ r, thett Ll¡e service connectlon shall rncan the downsÈream end of the nreter. ' frrere srrourcr be ¡ro unprotecte<r rowp'"
Èakeoffs from che servrce rr'e alrea<r of any neter or rrackf u".,tlon device 10caEe. at trle p'int of crelivcry to the flPage 199 of 318
I
14 16
I6
x?
IB
19 2a
81 22
23 24
26 26
I
2 I
6 6
7 I
9 l0
t1
L2
l3
cusÈomer'
arsolnclucle
s water systern. servíce corìnectio. . srralr
water servlce .(:
or¡nect. L.r¡ alloÈfrer llrorrr a flrr: lrvdranL a¡rd
temporary or emergency wnLer service r:onrìections
mthefr<¡
publtc poÈable wator e¡rs t errr.
t) watqr. - - r,secr. ¡\¡ rv rrater sur)Driecr rjicvfrornt¡y t!re t'e pocable watcr systenr i,r..r corìr;unrcr,. s v¡ater s.ystem. af
nolonger
cer tc has passecl rhrou¿h trre poi¡rt of deliverv. and is uncler È.e sanrtary cor¡tror '
f
trre cirv.
Sec. 6-7. 03. Re.¡uirenre¡rts.
a) l.laEer .Sys tern.
1) The water svstenr shall tre consiclerecl as
made up of two parts: Tl¡e clr:v Íìysten nrrcl t:he custor,¡ er system. 2) r'.e ctty system srrarl c.¡rsrsE of ttre source
facilltles and ühe tllstrlburio¡r sys tcm; ancl shall lncluclc all those faclllcles of the watcr sy.stem untter the complete control of the ctcy up to the ¡ror-rrt wrrere Lrre cuslLonrcr, s svstem beglns.
3) T.e sourcc srra I l r.clurte arl corn'orìents of
faclllcles uElllzecl L. the nrcrclt¡ctio¡r, trcaLrîenr, st.ra¡¡e, dellvery of vraÈer to Ehe clistrlbutlon sysÈem.
4) The dlsÈrlbutlo¡r system shall
necwork of condúlte used for thc clcllver. y of water
source t.o the customer' s nystem.
tl¡e
and
f nc I urle the
fron the
parcs of the
dlstrlbuElon
5) Tl-re cus Lorner' s sys ten sha r I i.nc rucre tlrose facllirles beyond the ternrination of. the City
system wtrich are uríIizecJ in conveyÍ¡ rg Citv
9-
I
I
2 ã
4 6
6 7
I
I
10 11
L2
13 14
1 L6
17 18
19 20
e1
22 23
24 25
dellvered do¡nestic water. to poirrts of use.
sec. 6-7.04, lrr.s,t-arratr.otr of r..latcr Í-ervf ce con¡recti. on MainÈenance.
No waÈer servr-ce con¡re(ì t rorr to a.y premr. ses sha r r be lnsÈa1led or maLr¡tal.ed u¡r1css the v¡ater s;un¡rlv is ¡ rrotecÈeclas requlred by staEe laws ancr regtrlatro. ancr trrls crra¡rter. aprevenElon
servlce of water to a¡ry prerrrrses srra I l be drsco.E rnue<J Í f devrce require.'y trrrs crrapter 1s noÈ i¡rstarred,
tested and marntafnad, or tf f t rs founcr thaE a backf:row prevenÈlon devrce. rras been remove<r, by-¡lassed, or rf a¡r un_ proÈecÈed crogs- con¡recÈlon r:xlsts on tl¡e ¡rrenrlses. service wlll noÈ be restored u¡rtLl st¡ch co¡rdlclons or defeccs ¿¡r* correcEed.
sec' 6-7.05. ,
r¡rspect- rr.rrr of cust, onrer' s systern.
The cusEo¡ ner's system slroul.rt be open f.or lnsructl.r¡ at all reasonable tlmes to authorlzecl rcprese¡rtaLl'res ¿ f Èhe I,.blic lJorks lJater Dlvlslo¡r to <leLer¡nine whether cross-connecti<¡ns or other strucÈural or sanltary hazarcls, inclu<lin¡,. violatlons of these regulatlons, exlst. l'ihcn such a co¡rditlc¡n l¡ecomes known, Èhe Dtrector srralr. <Ieny or rnr¡necllaterv < lrscpntinue servlce to the premlses by ¡>rovlclln¡, for a n¡vr¡lcal l¡reak in Èhe servlce 1lne unEll the customer has corrected Ëhc conctltlon( s) ln conforma.ce rvlrh staLe nrrtl city statu' es relatin¡, to nrurnbrng ancl waÈer supPlles antl the relÌulatlo¡rs aclopted DursualìL thereto.
Sec. 6- 7.06. lJaclif lorv I)evices .
Â'n aporoved backf row Dreve. tlo¡r devlce shall also be 26 l0-
t
T
I
9 10
L6
1B
19 20
2L
22 g3
24 25
26 L
2 4
6 6
11 L2
f3
l4
L6
lnsÈalled on eacl¡ service.rinc.
aEor
to a customcr,s water svsEem
near Èhe proPerLy rl',o or-'llrr'e<llatcly ir¡r¡lcle tl¡e lrtrlltli.¡, belng served; but in .rr. case.e, before trre f irst branch lineleadtng' off trre'servrce rlne wrrerever crre f-orlowrrr¡, Jltl0nsexlscon< È.
a) rn Èhe case .f
watersupply
irrernrses havrrrg ân auxlltary
orchemlca.
w'rcrr fs not or may rìot be of safe bacterl0l0¿i.cal
l qualtty ana r¡rricrr is noE acceptable as an. a< JcJttionalsource by Erre DirecÈor, t'e ctty water system sirarr be pro_ cecte¿ agalnsc backftow from Lhe orenrlses try installtn¡ a back_ flow preventron devrce in Èhe servíce rlne npDroDriate to thedegree of hazard. b) rn trre cnse of ¡r¡¡,¡¡¡J-oss on w^f ch any rn<rr.c
trialflulds or any oÈher obJectLo. nt¡1e s¡r¡bstn¡rce ls l¡andlect i¡r such a fashron as to create a¡r acttrar or p.tenLrar hazard the clty water sysue¡ n, trrr: ctty system s¡hall be protected agalnsÈ backflow fro¡n tlre pre¡nises [, y ln.stalllrr¡,, a backflow preventron trevrce il¡ trre service r.ine ånDro' rraLe Èo the degree of hazar<I. Thi.s srrall r¡rcrucre the hancflirrg of procese waterg an<l water: s or.l¡,.[¡atirr¡q fr.om tt¡e C.itv sysÈem whlch have beerr subJecr: to rreterlorar- ro¡r
i¡r quarrty.
c) rn tl¡e case of l)rcnrIses havin¡r ( l) inter¡ra I crossconnecÈlons ÈhaÈ cannot be pertnanently correcte< l a¡r<l controlled, or ( 2) lnLrlcate plurnblng ancl pllrl¡rg arrang.enrents or wtrere entry to all porÈlons of the premrses r.s ¡roL reactiry acces.sibre for lnspecÈlon purposes, mak.lrr¡i it lrn¡rraccicable or ln¡>osslble 11-
1 16
L7
18 l9
20 2L
22 23
24 26
26 1
2 o
4 6
to agcerLaln wheLher or ¡ìot trangerou. s cros.s-conrìecr:Íons exrsÈ, the ctLy r,¡aÈer sys tem . grrar l be pr<_r tected agalns r:
ackf
ror^¡
from Èhe premies by fnstalllrr¡¡ a backf
lnthelow ¡r¡s\rention ttevlce
servLce llne.
Sec. 6-1 .07. proEecLive Devises l)egree oE U.azarcl.
The ÈyPe of protectlve, luvlce
rs6-
requíretl uncler subsectlo¡
ofhazard
7' 06 (a), ( b) and ( c) shall <Jepend upon rrre deg.ree whlch.exlsts as follov.rs: .
a) r¡r El¡e case o.t any ¡;
anauxlllary
rernles v¡l¡ere t¡ere is
water supply aa sÈatecl
ofEhts
lrr subsection 6-7.06(a)
Chapter ancl iC ls noÈ strbject to a¡Ì), of the followi.n¡l rules ' Èhe clÈy water sys tern sl¡;¡ I I be protec üccl by an a¡r¡ rroveclalr- gap separatLon or an approve( t rcctuce<. 1 Dressure nrlncir¡le backflow prevenÈlon. devlce.
b) rn Èhe case of ¿uìy ¡
waceror
rremles v¡l¡ere t¡ere f s
subsÈance tr'tc woul<l be obJecLlo¡ ab1e l¡uc noÈ ¡azar<Jou.s to. health, Íf rnEroduced rnÈo trre citv water syster: r,' trre ciLv waÈer sysÈem shall t¡e protectecl by a¡t approvecl clout¡le check valve assembly.
c) rn Ètre case of nrìy premrses wrrere therc is any
maÈerl'a1 <langerous to l¡ealLh wlricl¡ is hancllecl ln such a f¿rshion as to creaEe an actual 0r potertral rrazarcr to trre cltv ,^,ater system, Èhe crÈy wficer systern sharr be procecte(r by an ao¡rroúed alr-gap separatlon or an a¡rprovetr reduced I)ressure princlpre backf low prevenÈlott devlce. tixanr¡r les of premlses r^rhere t¡ese condltlons
rqrll exrsE inclt¡dc sevrnge treatn¡crrI r,ra.ts, sewage 6 7
I
0 10
11 t2
13 14
t?.-
I
10 11
L2
1 14
16 I6
1?
18 19
80 g1
22 23
24 25
26 I
8 4
6 6
7 I
puu¡plng statrons, crrernlcar ¡ ranrtacttrrrr¡, ¡ rlarrts, rrosnitals, mortuarles ancl platlng [rlnnt:sr.
d)
aret'
In Èlte case .f any premises where there
unco¡rÈrolrecl"
b'r.r"s-co.necr:r o's, ertrrcr nctuar or poLentfal,
Lhe City !,rater sysEern shall l¡e ¡rrotectecl Lr.¡ a¡t a¡i¡rrovetl airg'p separaÈion or ar¡ approvetl' rccJucecr presfrure princlple backflohr prevenEion devlce at Erre servrce co¡ì.ecriorr e) rn E.e case of a.y premrses wr"¡ere, because of,
uriiy requlremenÈs or other prohibltio.s or resËrÍcti. ns tt 1s Lmposslbre or irnpractical ro ¡nake a cornf) lete ín-¡rI.;rnt cross-connecÈion survey, Ehe Ctty water svscem shall be ProÈecced agalnsÈ backflow or b¿rcþ._slphona¡,. e fron¡ the ¡> rermlsesby Èhe l-nsÈallatron of a backf row preve'tf '. devr_ce rn Lrre eervlce llrre ' rn Llrls¡ cn$e, ¡ìr:ìxl.nrtr¡n ¡ rrotccr-lon rvt I I l>e reoulred; thaE. ls, an approved alr-¡;ap se¡raratlo' or nn a¡:provcc! reclucecl pressure prlncl'ple backflow pr-cverìLlo¡r <levlce shall be l.stalled ln each servlce to Èl¡e preml- ses.
Sec. 6-7.08. Approval of l)irector.
Any backflow preventlon clevice requlrecl hereln s¡all be of mo<lel and slze approved by trre Dlrector. î'rre term .,'.{¡rproV€ d Backf low PrevenÈlon Devlce" shnl1 rnean a dr:vlce Èlrat llas treen manufactured ln fu11 conforntnnce wlth the s tan<larcl.r es tabllshecl by the Amerlcan srater rlorks Associatro¡-¡ entrErer.!:
l'iWA
C506-78 Stantlarcls for Iìe<lt¡cetl I'ressure prlrrcinle pieventionDevices: ancl Double check valve llackf loru
and have mec collrPl. etely the laboratory ancl fíelcl nerforrnance 13-
Add: "and Cross-Connection
Control Program Specialist" after
Director
I
t;
I
a. tL
5 6
7 I
9 10
11 L2
13 14
16 sPeclflcatlons of the Foundatitr¡ r
f.r cross-con¡rcctio¡r ct¡.trol
and llydraullc Reeearctr, of the tl¡rlversity of soutlrer¡r ca lJ. fornla' establlshed' by
l,¡
cesttGespeelfleatl"rr of Rncl<flow l'¡:cve¡¡tfon Devr. ctrrrenrlssue
2 <lare<l March, i6i-;; ií;;'il;È
said AH,A an. Fccc&tR etandardi nr¡< r specrficntrons have been adopted by In" Director. Frnal a¡r¡rroval srralr be evicjenced by a "C.erÈlflcate of Approval,, issued by an aoprovetl testin¡. laboratory cerËlfylng fu11 cornpllance wlth sai<l AtitJA stanclards and FCCC& ÌIR SpeClflcarLons
heDlrector
Ttre followrng tes Etng laboratory r.¡as been qurrrif ted by t, Èo, Èost a¡rcl cerÈtfy bacl<f low preve¡ rCe:... s
Foundcrblon
ResearchU¡
for cross-cotruectl.o¡r conÈrol fr llvclraurlc
U¡ rtverbtry of Souchãrn C¿rltfàiiirà-' rlverstty parlc Los r\ngelee, C^ 90008
TeeÈlng laboraEorles oÈlrer than the lat¡oratory ll.sterl above wtll l¡e adcled. to an approvecl llst as Ehey are gualrfletl bv the IDlrector.
I
Backflow preventers whrclr may be subJecte<r Èo back pressure or back slphonage Èhat have treen fully Lested and ¡ ave l:een granÈed a Certlflcate of Âpp::oval by sald r¡ualtfterl Iaboracory and are 1lsced on the raborar:( rry's currenu l.lst of ,,Anproved Devf cea" may . be used wlLhout further test or c¡uallf lcacl.¡rs. .
Sec. 6-7 .09. InspecÈlorr ancl Tes Es.
Ic shall be the duty of the cuscorqer- user at an.y premise where backf low preventlon clevlces are lrrs tallecl to have cerEtf ied Lh16
1?
L8
19 20
2L
22 24
26 2.0
i
I
2 3
4 6
6 7
I
9 t0
1T
L2
l3
14 1
16 17
1.8 I9
20 81
22 o!t
24 25
26 lnspecÈions ancl operatronar te.srs ¡nacre at least o¡rce Þer year. rn Èltose ins Lances whe¡e tl¡r: Dircc tor tlee¡¡rs t5e hazarrl to be greaE enough, he may requirc cerlifle<t i¡rsoecÈÍons at nore , frequenttnLerv; ls.Tlreselrts¡ lectlotrsattdEesrssha1lbe âÈ
bythe
the expense of the waÈe* ser and srrarl be performed
devlce manufacÈurerrs a"pràrentaÈrve, by lru!>ric ¡,orks I,IaEer Dlvlston personner or by a certlf tect test er a¡r¡rroved fry trreDlrecco. r, rc shatl be the cruty of the Dlrector to see trraE Èhese timely cests are macle. The custo¡ner-user slrall nor:ify the DlrecÈor ln advance whe¡r the tests are to rre uncrertake. so thac he or trrs representaLlve rnay wrc¡ress the tesLs of. s() deslred. These devrces shall be reparre<r, overhaurecr or replace<l at ch" u*p"rr"" of tlre customer-user whenevor satcl tdevlces are founcl Èo l¡e defect:ive. Recorcls of ",
r"t,
testri,
repaLrs and overhauls ghalL trc ke¡rg ancl ¡ natle avnllable Lo the DlrecÈor. i
Sec. 6-7.10. presenLly I.¡rst-allecl Devices.
All presenLly insEalletl [¡ nckflow rlevi<:es which <lo nr>L meet the requlremenÈs of thls secEi.on but were anproved clevices for tlre purpose descrlbed herein at the time of instarlation and whlch have been properly nral.tai.ecl shal1, except- for the ÍnspectLon a¡td malnEellance rerlrrlre¡ nerrts unrler Sectlon 6-l ,Og. be excluded from the requrrenlent. s oJ: these rules so ron¡, as Èhe'DirecÈor ls assurecl Lhat tlrey wtll satlsfactorlly DroEecE tl¡e CtÈy system. llltenever the exlsElng device f s rnoved from the present locaLlon or reqtrires more tha¡r minlmum malntenance t
15-
the Cross-Connection Control Program Specialist
Add "or Cross-Connection Control Program Specialist
or when the Director finds that the maintenance constitutes a hazard to health, the unit shall be replaced by a backflow prevention device meeting the requirements of this Section.
Section 2. This ordinance shall take effect thirtv (30) days after its passage, and a summar. y of this ordinance shall be published within fifteen ( 15) davs after adoption of this ordinance or amendment, together with the names of those City Council Members voting for or against the ordinance or amendment, and the City Clerk shall post in the office of the Citv Clerk a certified copv of the full text of this ordinance along with the names of the City Council Members voting for or against the ordinance or amendment within fifteen ( 15) days after adoption hereof.
PASSED AND ADOPTED
by the following vote:
this 2s day Of January 1988
Ayes: Thomas, Hiebert,
Nayes¡ None
Absent: None
Prout, Nash and Zachary
ores nson,
Approved as to
Add "or Cross-Connection Control Program Specialist
Revise
I HEREBY CERTIFY That, Ihe
and adopted by the CÍty CounciL
regular meet,ing thereof held on
foregoing Ordinance was. passed
of the CÍty of Shafter at a
the 25th day of January
1989' by the following vote:
Ayes: Thomas, Iliebert, Prout, Nash and Zachary
Nayes¡ None
Absent: None
Revise
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix E
High Hazard Premises
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix E
HIGH HAZARD CROSS-CONNECTION CONTROL PREMISES
The list below identifies premises that require backflow protection provided by an air gap or a reduced pressure principle backflow prevention assembly, unless noted otherwise. The list below is not intended to be all-inclusive. A PWS, State Water Board, or local health agency may require an AG, RP, or both to protect a PWS from other hazards not listed below and identified in premises through the hazard assessment completed in CCCPH Chapter 3, section 3.2.1. A PWS may reduce or increase the minimum protection required for a previously hazard-assessed user premise following a hazard reassessment as described in CCCPH Chapter 3, section 3.2.1.
1. Sewage handling facilities
2. Wastewater lift stations and pumping stations
3. Wastewater treatment processes, handling, or pumping equipment that is interconnected to a piping system connected to a PWS (+)
4. Petroleum processing or storage plants
5. Radioactive material storage, processing plants or nuclear reactors
6. Mortuaries
7. Cemeteries
8. Sites with an auxiliary water supply interconnected with PWS (+)
9. Sites with an auxiliary water supply not interconnected with PWS
10. Premises with more than one connection to the PWS (++++)
11. Recycled water (++)(+++)
12. Recycled water interconnected to piping system that contains water received from a PWS (+)
13. Graywater systems, as defined in California Water Code Section 14876, that are interconnected to a piping system that is connected to a PWS
14. Medical facilities
15. Kidney dialysis facilities
16. Dental office with water-connected equipment
17. Veterinarian facilities
18. Chemical plants
19. Laboratories
20. Biotech facilities
21. Electronics manufacture
22. Dry cleaner facilities
23. Industrial or commercial laundry facilities
24. Metal-plating facilities
25. Business park with a single meter serving multiple businesses
26. Marine-port facilities
27. Car wash facilities
28. Mobile home park, RV park, or campgrounds with RV hookups
29. Hotels/motels
30. Gas stations
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
31. Fire stations
32. Solid waste disposal facilities
33. Pet groomers
34. Agricultural premises
35. Hazard assessment access denied or restricted
36. Railroad maintenance facilities
37. Incarceration facilities (e.g., prisons)
38. Temporary connections to fire hydrants for miscellaneous uses, including construction
39. Private water distribution mains
40. Drinking water storage tank overflow connected to a sump or storm drain (+)
41. Airports
(+) Premise isolated by air gap only except as allowed through CCCPH Section 3.2.2(c) (++) Dual-plumbed use areas established per CCR Title 22, Section 60313 through 60316 where recycled water is used for individually owned residential unit. (+++) Residences using recycled water for landscape irrigation as part of an approved dual plumbed use area established pursuant to CCR Title 22, sections 60313 through 60316 shall use, at a minimum, a DC. If the water supplier is also the supplier of the recycled water, then the recycled water supplier may obtain approval of the local public water supplier or the State Water Board, to utilize an alternative backflow protection plan that includes an annual inspection of both the recycled water and potable water systems and an annual crossconnection test of the recycled water and potable water systems pursuant to subsection 60316(a) in lieu of any BPA.
(++++) All connections must receive at least the same level of protection excluding fire protection when connected to the PWS distribution system (e.g., if one connection requires an RP then all connections must have RPs installed).
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix F
Assessment Database
Zone No. Account No. Customer Name Service Address Service Type Service Size Meter Size Meter S/N Backflow Type Manufacturer Backflow Size Recommended
BPA
Assessment
Date
CCCPS Name, No.
100 1234567 Jonathan Johnson 12365 W. Longstreet Name Commercial 1-inch 1-inch W-123456789 RP Febco 1-inch RP 12/12/2025 M. Torres, No. 12345 100 1234568 Mary Smith 12366 W. Longstreet Name Industrial 1-inch 1-inch W-123456790 RP Febco 1-inch RP 12/13/2025 M. Torres, No. 12346 100 1234569 Bill Jones 12367 W. Longstreet Name Multi-Family 1-inch 1-inch W-123456791 RP Febco 1-inch RP 12/14/2025 M. Torres, No. 12347 100 1234571 Jose Martinez 12369 W. Longstreet Name Agricultural 1-inch 1-inch W-123456793 RP Watts 1-inch RP 12/16/2025 M. Torres, No. 12349 100 1234572 Adam Lin 12370 W. Longstreet Name Landscaping 1-inch 1-inch W-123456794 RP Watts 1-inch RP 12/17/2025 M. Torres, No. 12350 100 1234570 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 100 1234572 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 100 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 100 1234571 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 100 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 100 1234574 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 100 1234572 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 100 1234574 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 100 1234575 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 Cross-Connection Assessment Tracking Sheet
Zone No. Account No. Customer Name Service Address Service Type Service Size Meter Size Meter S/N Backflow Type Manufacturer Backflow Size Recommended
BPA
Assessment
Date
CCCPS Name, No.
200 1234567 Jonathan Johnson 12365 W. Longstreet Name Commercial 1-inch 1-inch W-123456789 RP Febco 1-inch RP 12/12/2025 M. Torres, No. 12345 200 1234568 Mary Smith 12366 W. Longstreet Name Industrial 1-inch 1-inch W-123456790 RP Febco 1-inch RP 12/13/2025 M. Torres, No. 12346 200 1234569 Bill Jones 12367 W. Longstreet Name Multi-Family 1-inch 1-inch W-123456791 RP Febco 1-inch RP 12/14/2025 M. Torres, No. 12347 200 1234571 Jose Martinez 12369 W. Longstreet Name Agricultural 1-inch 1-inch W-123456793 RP Watts 1-inch RP 12/16/2025 M. Torres, No. 12349 200 1234572 Adam Lin 12370 W. Longstreet Name Landscaping 1-inch 1-inch W-123456794 RP Watts 1-inch RP 12/17/2025 M. Torres, No. 12350 200 1234570 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 Cross-Connection Assessment Tracking Sheet
Zone No. Account No. Customer Name Service Address Service Type Service Size Meter Size Meter S/N Backflow Type Manufacturer Backflow Size Recommended
BPA
Assessment
Date
CCCPS Name, No.
300 1234567 Jonathan Johnson 12365 W. Longstreet Name Commercial 1-inch 1-inch W-123456789 RP Febco 1-inch RP 12/12/2025 M. Torres, No. 12345 300 1234568 Mary Smith 12366 W. Longstreet Name Industrial 1-inch 1-inch W-123456790 RP Febco 1-inch RP 12/13/2025 M. Torres, No. 12346 300 1234569 Bill Jones 12367 W. Longstreet Name Multi-Family 1-inch 1-inch W-123456791 RP Febco 1-inch RP 12/14/2025 M. Torres, No. 12347 300 1234571 Jose Martinez 12369 W. Longstreet Name Agricultural 1-inch 1-inch W-123456793 RP Watts 1-inch RP 12/16/2025 M. Torres, No. 12349 300 1234572 Adam Lin 12370 W. Longstreet Name Landscaping 1-inch 1-inch W-123456794 RP Watts 1-inch RP 12/17/2025 M. Torres, No. 12350 300 1234570 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 300 1234572 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 300 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 300 1234571 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 300 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 300 1234574 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 300 1234572 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 300 1234574 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 300 1234575 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 300 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 300 1234575 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 Cross-Connection Assessment Tracking Sheet
Zone No. Account No. Customer Name Service Address Service Type Service Size Meter Size Meter S/N Backflow Type Manufacturer Backflow Size Recommended
BPA
Assessment
Date
CCCPS Name, No.
400 1234567 Jonathan Johnson 12365 W. Longstreet Name Commercial 1-inch 1-inch W-123456789 RP Febco 1-inch RP 12/12/2025 M. Torres, No. 12345 400 1234568 Mary Smith 12366 W. Longstreet Name Industrial 1-inch 1-inch W-123456790 RP Febco 1-inch RP 12/13/2025 M. Torres, No. 12346 400 1234569 Bill Jones 12367 W. Longstreet Name Multi-Family 1-inch 1-inch W-123456791 RP Febco 1-inch RP 12/14/2025 M. Torres, No. 12347 400 1234571 Jose Martinez 12369 W. Longstreet Name Agricultural 1-inch 1-inch W-123456793 RP Watts 1-inch RP 12/16/2025 M. Torres, No. 12349 400 1234572 Adam Lin 12370 W. Longstreet Name Landscaping 1-inch 1-inch W-123456794 RP Watts 1-inch RP 12/17/2025 M. Torres, No. 12350 400 1234570 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 400 1234572 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 400 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 400 1234571 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 400 1234573 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 400 1234574 Fred Brown 12368 W. Longstreet Name Residential 1-inch 1-inch W-123456792 None None 12/15/2025 M. Torres, No. 12348 Cross-Connection Assessment Tracking Sheet
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix G
Site Assessment Form
Do any of the following exist:
Dental and/or medical equipment using water Laundry facilities Pumps or motors connected to water or sewer piping Multiple tenant suites Chemicals in quantities greater than 5 gallons or 5 lbs. Graywater system(s) Water storage tanks, ponds, water treatment systems,
sewage treatment, sewage storage, and/or wells
Petroleum, chemical or radioactive materials processing or storage Type of Business
Veterinary Manufacturing
Pet grooming Food Processing
Medical/Dental Restaurant
Office/Warehouse Aerospace
Hotel/Motel Retail
Other (explain below):
Site Contact
Contact Name:
Business Name:
Phone No.
Email:
Signature
Print Name:
Title:
Date:
Degree of Hazard Meter protection appropriate for Degree of Hazard Internal Protection and Referral to OC Health High Yes Yes
Low No No
No Hazard
Cross-Connection Control Specialist Reviewer:
Cross-Connection Control Program Specialist Certification No. Expiration Date: ` Review Date:
To help prevent cross connection and backflow incidents confirm the following
FOR CITY OF SHAFTER USE ONLY
City of Shafter - Commerical/Industrial Site Assessment If yes, what chemicals are present:
If yes, please describe:
I am uncertain of the hazards on site and request an inspection.
I certify that the above information is true and correct to the best of my knowledge.
On December 19, 2023, the State Water Resources Control Board adopted the Cross-Connection Policy Handbook which became effective on July 1, 2024. This new legislation requires each public water system to conduct initial and ongoing inspections of potentially high hazard facilities to determine the level of hazard within this facility. The City is conducting site assessments at commerical/industrial sites which will be reviewed and approved by :
Marco Torres, Deputy Public Works Director - Operations at [email protected]
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix H
Backflow Prevention Assembly Diagrams
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Diagram 1
Double check detector backflow prevention assembly
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Diagram 2
Double check detector backflow prevention assembly – type II
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Diagram 3
Double check valve backflow prevention assembly
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Diagram 4
Pressure vacuum breaker backsiphonage prevention assembly
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Diagram 5
Reduced pressure principle backflow prevention assembly
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Diagram 6
Reduced pressure principle detector backflow prevention assembly
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Diagram 7
Reduced pressure principle detector backflow prevention assembly – Type II
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Diagram 8
Spill-resistant pressure vacuum breaker backsiphonage prevention assembly
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Swivel-Ell Design and Construction Criteria
The criteria below, in conjunction with the swivel-ell diagrams that follow (Diagrams A and B), are minimum acceptable design and construction-related requirements for utilizing a swivelell. For restrictions and allowances for utilizing a swivel-ell, see CCCPH section 3.2.2.
A. Prior to operation of a swivel-ell, the PWS will receive approval for the design and construction plans of that swivel-ell from the State Water Board.
B. The drinking water supply must not, under any circumstances, be directly connected to the recycled water supply, nor be designed such that the recycled water use site could be supplied concurrently by a recycled water supply and a drinking water supply.
C. The drinking water supply line and the recycled water supply line must be offset (see Diagram 9b) in a manner that ensures a tee-connection, spool, or other prefabricated mechanical appurtenance(s) could not be readily utilized in lieu of the swivel-ell connection, nor result in the recycled water use site being supplied concurrently by recycled water and drinking water.
D. The recycled water supply line used in conjunction with the swivel-ell must be the only recycled water supply to the recycled water use area.
E. The swivel-ell must be located as close as practical to the public water system service connection, with the swivel-ell connection being located as close as practical to the RP upstream of the swivel-ell.
F. The swivel-ell must:
1. be located above ground;
2. be color-coded pursuant to section 116815 of the CHSC and its implementing regulations;
3. include appropriate signage, as required by regulation and the State Water Board;
4. be provided the security necessary to prevent interconnections, vandalism, unauthorized entry, etc.; and
5. be provided with meters on both the recycled water service and drinking water service connections.
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Legend for Diagram 9a and 9b (also see next page)
RP = Reduced pressure principle backflow prevention assembly RW = Tertiary-treated recycled water originating from wastewater treatment facility DW = Drinking water originating from a public water system W = Water (tertiary recycled water or drinking water) to use site. As pictured, configured for supplemental drinking water to the use site.
M = Meter (next page)
PE = Plain End (next page)
GRV = Groove (next page)
PWS = Public Water System (next page)
Diagram A: Example Swivel-Ell Pictorial (also see Plan View Schematics) Note: The RP, a required component of an acceptable swivel-ell, is not shown in the picture.
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Diagram B
Swivel-Ell Typical Plan View Schematics
(not intended to be an exact portrayal of the pictorial)
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix I
Cross-Connection Incident Response Form
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Cross Connection Incident Report Form
CALL DETAILS
1. Caller Name: Phone number:
2. Call Date: Time:
3. Location address:
Street Number Street Name City
4. Name of
ownership/business:
ISSUE DESCRIBED BY CALLER
5. Estimated start date & time:
6. Description of issue:
7. Name of City of Shafter Inspector:
ON SITE DETAILS
8. Site conditions: (Check all that apply)
Meter Protection
Last Test Date:
Circle: PASS FAIL
Designated Industrial Line
Dual Plumbed Bldg.
Cooling Tower
Kitchen/Cafeteria
Recycled Water onsite
Cooling Tower
Chemical Pumps/Motors
Laboratory
Multiple
Tenants
Notes:
9. Number of persons in the building:
10. Kern County
Environmental Health
Division Notified:
661-862-8775 or
[email protected]
YES NO
If yes, name: Date & Time of Notice:
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
Appendix J
City Standard Specifications and/or
drawings
City of Shafter Cross Connection Control Management Plan (CCCMP) City of Shafter CCCMP – June 2025
City Standard Specifications and/or
drawings
https://www.shafter.com/56/SubdivisionEngineering-Design-Manual
CONSENT CALENDAR
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Marcos Torres, Deputy Public Works Director SUBJECT: WATER METER AND METER BOX PURCHASE FOR METER
RETROFIT PROJECT (CIP NO. WA00007) APPROVAL
RECOMMENDATION
Council find the action is not defined as a “project” per Section 15378(b)(4) of the CEQA Guidelines; accept a cost proposal for purchasing 429 residential water meter assemblies from Badger Meter totaling $156,004.92 (Quotation No. 3801729); accept two (2) proposals for meter boxes and lids; approve one (1) proposal submitted by Core and Main for said meter boxes and lids valued at $21,582.99 (Bid No. 4405292); and authorize the Deputy Public Works Director to issue a purchase order for the water meter assemblies, boxes, and lids, at a total cost of $177,587.91
BACKGROUND
The City maintains an ongoing Capital Improvement Program (CIP) project to replace and upgrade water meters. The program supports state reporting requirements and improves operational and water-use efficiency. The customers also benefit from improved accuracy of meter reads. This project is part of the City's phased effort to transition to Advanced Metering Infrastructure (AMI) technology, which improves operational efficiency by enabling remote reads, early leak detection, and better customer engagement. This phase upgrades 429 water meters and boxes across both core and outlying service areas.
Authorized vendors have recently submitted cost proposals for supplying the equipment needed for these replacements. The first quote was submitted by Core and Main at a total cost of $21,582.99. The second was submitted by Ferguson Waterworks at a total cost of $22,207.90. Core and Main submitted the lowest responsive quote and is a previously approved vendor.
Badger Meter submitted a proposal of $156,004.92 for purchasing the water meter assemblies. They are the sole manufacturer and distributor of their product line in California. Accordingly, their proposal qualifies for a sole source purchase.
FISCAL IMPACT
The City's Capital Improvement Program Project No. WA00007 has $375,000.00 programmed for water meter retrofits with sufficient funds remaining. No budget action is required.
WATER METER AND METER BOX PURCHASE FOR METER RETROFIT PROJECT (CIP NO.
WA00007) APPROVAL
- 2 -
CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(4) of the CEQA Guidelines because the action is the approval of the purchase of water meters and meter boxes for the meter retrofit project that has already been environmentally cleared and therefore, it is the creation of a governmental funding mechanism or other fiscal activity that does not involve any commitment to a specific project that can result in a potentially significant impact and not subject to CEQA.
APPROVED BY THE CITY ATTORNEY
Not Applicable
ATTACHMENTS
1. Badger Meter Quote
2. Core and Main Quote
3. Ferguson Waterworks Quote
Badger Meter Inc.
4545 W Brown Deer Road Milwaukee WI 53223
PO Box 245036 Milwaukee WI 53224-9536
To Customer ID 00023111
CITY OF SHAFTER
336 PACIFIC AVE
SHAFTER
California , 93263
Revised Date:
Pricing Effective Dates: 08-25-2025 - 11-24-2025
Salesperson Proposal Subject Shipping Terms / INCO Terms Payment Terms 008102 DAVID BLAKENEY Proposal_3801729_08-25-2025 PREPAY/NO CHARGE For SHIPMENTS > $35,000
FCA FACTORY
NET 30 DAYS
Line # Description Qty Unit Net Price
USD
Line Totals
USD
1 BMI Part No.: 110-7108
Cat String: DS-DBA-PB1P-XXD3-Y2-M1AM-2B2X1-8BE-NN-AG-TF-AAB0A Description:
DS - Rcdl Disc Lead-Free Brz Alloy (NSF-61-372), DBA - MODEL 35- 3/4" (3/4 X 7-1/2) Potable, B1 - LOW LEAD BRONZE BOTTOM, 430 SS (ONE) Plastic, XX - None, Badger Std (TS-135), Y2 - YR MFG 9D & PBB, HR-E ORION CELLULAR, 2 - POLYMER LID / POLYMER SHROUD (GREY) Torx Seal Screw, Street read, None, Standard, 8 Dial - 0.1 Gal, E - 1,000 NN - YR 9D BRCD IN, YR 9D OUT Pit/Remote Thru Lid Kit, TWIST TIGHT - 5 FT (MTR, ASSY), AA - Ground/Ocean (Paused), B0A - BADGER METER STANDARD (ID=B0A)
395 330.38 130,498.13
2 BMI Part No.: 108-3140
Cat String: DS-KCC-PB2P-XXD3-Y2-M1AM-2B2X1-8BE-NN-AG-TF-AAB0A Description:
DS - Rcdl Disc Lead-Free Brz Alloy (NSF-61-372), KCC - MODEL 70- 1" (1 X 10-3/4) Potable, B2 - LOW LEAD BRONZE BOTTOM, 430 SS (ALL) Plastic, XX - None, Badger Std (TS-135), Y2 - YR MFG 9D & PBB, HR-E ORION CELLULAR, 2 - POLYMER LID / POLYMER SHROUD (GREY) Torx Seal Screw, Street read, None, Standard, 8 Dial - 0.1 Gal, E - 1,000 NN - YR 9D BRCD IN, YR 9D OUT Pit/Remote Thru Lid Kit, TWIST TIGHT - 5 FT (MTR, ASSY), AA - Ground/Ocean (Paused), B0A - BADGER METER STANDARD (ID=B0A)
25 457.88 11,446.88
3 BMI Part No.: 107-8234
Cat String: DS-REB-PFAS-XXD3-Y2-M1AM-2B2X1-8CE-NN-AG-TF-AAB0A Description:
DS - Rcdl Disc Lead-Free Brz Alloy (NSF-61-372), M170- 2" -Elliptical Long Drilled W/TP, Potable, 430 SS Bolts (None), Stainless Steel, XX - None, Badger Std (TS-135), Y2 - YR MFG 9D & PBB, HR-E ORION CELLULAR, 2 - POLYMER LID / POLYMER SHROUD (GREY) Torx Seal Screw, Street read, None, Standard, 8 Dial - 1 Gal, E - 1,000 NN - YR 9D BRCD IN, YR 9D OUT Pit/Remote Thru Lid Kit, TWIST TIGHT - 5 FT (MTR, ASSY), AA - Ground/Ocean (Paused), B0A - BADGER METER STANDARD (ID=B0A) 9 856.88 7,711.88
Domestic Quotation
Quotation No. 3801729
Thank you for your business!
Estimated ship dates subject to change based upon component availability, as a result of global supply chain constraints, or credit review.
This acknowledgment is made subject to the terms & conditions found on our web-site: https://www.badgermeter.com/terms-and-conditions.
Terms and conditions related to service units, training, and professional services can be found here: https://badgermeter.com/service-units-terms-and-conditions
Subtotal - USD 149,656.88
Tax 6,348.04
Total Price - USD 156,004.92
Notes and Assumptions
If applicable, sales tax and freight, if included on the proposal, is an estimate and will be recalculated based on rates and tax status in effect at the time of invoicing.
To expedite the order entry process, please ensure the following is noted on your purchase order: billing address, shipping address, purchase order number, quantity, price, payment terms, quotation number, and the vendor is listed as Badger Meter, Inc.
Please send all purchase orders to the contact that prepared this quotation for you.
Actual lead time to be provided at time of order.
Badger Meter provides certification files to help manage meter and endpoint inventory and to maintain meter accuracy data. The standard method of delivery for this format is via electronic mail. Any deviations from our standard format, or any custom file formats, will be considered on a time and material basis.
Due to continuous improvements and redesign of Badger Meter products and technology solutions, Badger Meter reserves the right to provide our newest product solutions as an alternative to the proposed products provided they are in conformance with the requirements of the specifications and do not exceed the prices quoted.
Domestic Quotation
Quotation No. 3801729
Thank you for your business!
Estimated ship dates subject to change based upon component availability, as a result of global supply chain constraints, or credit review.
This acknowledgment is made subject to the terms & conditions found on our web-site: https://www.badgermeter.com/terms-and-conditions.
Terms and conditions related to service units, training, and professional services can be found here: https://badgermeter.com/service-units-terms-and-conditions
CITY OF SHAFTER
720 Commerce Way
SHAFTER, CA 93263
Contact: JOE OBRIEN
[email protected]
Job
METER BOX QUOTE
Shafter, CA
Bid Date: 08/21/2025
Bid #: 4405292
Sales Representative
Shannon Ulrich
(M) 661-316-8594
(T) 661-834-1162
[email protected]
Core & Main
4920 Lisa Marie Ct
Bakersfield, CA 93313
(T) 6618341162
Bid Proposal for METER BOX QUOTE
CUS
TOMER
CONTA
C
T NOTE
S
08/21/2025 - 3:18 PM Actual taxes may vary Page 1 of 2
Seq# Qty Description Units Price Ext Price
10 156 B16 CONC UTILITY BOX-CHRISTY EA 55.00 8,580.00
20 156 B16P REIN. CONC. LID W/HOLE FOR READING PROBE 1020610 EA 46.00 7,176.00 30 98 B12P CONC LID WATER W/PROBE HOLE EA 34.00 3,332.00 40 5 B16P REIN. CONC. LID W/HOLE FOR READING PROBE 1020610 EA 46.00 230.00 50 4 B30P CONC METER BOX COVER W/PROBE HOLE EA 58.00 232.00 60 7 B36P PROBE LID CONCRETE LID F/PROBE READING EA 82.00 574.00 Sub Total 20,124.00
Tax 1,458.99
Total 21,582.99
UNLESS OTHERWISE SPECIFIED HEREIN, PRICES QUOTED ARE VALID IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY CUSTOMER FOR MANUFACTURE WITHIN THIRTY (30) CALENDAR DAYS FROM THE DATE OF THIS QUOTATION. CORE & MAIN LP
RESERVES THE RIGHT TO INCREASE PRICES TO ADDRESS FACTORS, INCLUDING BUT NOT LIMITED TO, GOVERNMENT REGULATIONS, TARIFFS, TRANSPORTATION, FUEL AND RAW MATERIAL COSTS. DELIVERY WILL COMMENCE BASED UPON MANUFACTURER LEAD TIMES. ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEAD TIMES MAY BE SUBJECT TO PRICE INCREASES AND/OR APPLICABLE STORAGE FEES. THIS BID PROPOSAL IS CONTINGENT UPON BUYER’S ACCEPTANCE OF SELLER’S TERMS AND CONDITIONS OF SALE, AS MODIFIED FROM TIME TO TIME, WHICH CAN BE FOUND AT: https://coreandmain.com/terms-of-sale/ THIS BID MAY INCLUDE GLOBALLY SOURCED (IMPORTED) MATERIALS THAT ARE SUBJECT TO CHANGING TARIFFS. PRICES ARE SUBJECT TO CHANGE DUE TO POTENTIAL ADDITIONAL TARIFFS IMPOSED BY THE U.S. GOVERNMENT. IF IMPOSED, PRICES WILL INCREASE BY THE SAME PERCENTAGE AND WILL BE EFFECTIVE ON THE DATE THAT THE NEW TARIFFS ARE IMPLEMENTED. THESE ITEMS SHOULD BE PURCHASED WITH HASTE TO AVOID ANY ADDITIONAL RISING TARIFF COSTS.
CITY OF SHAFTER
Job Location: Shafter, CA
Bid Date: 08/21/2025
Core & Main Bid #: 4405292
Core & Main
4920 Lisa Marie Ct
Bakersfield, CA 93313
Phone: 6618341162
Fax: 6618341395
Bid Proposal for METER BOX QUOTE
08/21/2025 - 3:18 PM Actual taxes may vary Page 2 of 2
FERGUSON WW BAKERSFIELD #2777
2900 FAIRHAVEN DRIVE
BAKERSFIELD, CA 93308-6125
Phone: 661-396-3230
Fax: 661-397-7429
Deliver To:
From: Robert Calvillo
[email protected]
Comments:
HOW ARE WE DOING? WE WANT YOUR FEEDBACK!
Scan the QR code or use the link below to
complete a survey about your bids:
https://survey.medallia.com/?bidsorder&fc=2777&on=2549
14:23:50 AUG 25 2025
FERGUSON WATERWORKS #2777
Price Quotation
Phone: 661-396-3230
Fax: 661-397-7429
Bid No: B016491
Bid Date: 08/21/25
Quoted By: DXM
Cust Phone: 661-746-2065
Terms: NET 10TH PROX
Customer: CITY OF SHAFTER
336 PACIFIC AVE
SHAFTER, CA 93263-2047
Ship To: CITY OF SHAFTER
336 PACIFIC AVE
SHAFTER, CA 93263-2047
Cust PO#: AMR LIDS Job Name: AMR LIDS
Item Description Quantity Net Price UM Total
CB16BOX MTR BX 156 57.485 EA 8967.66
CB16GP B16GP CNCRT LID W/ PROBE 156 45.649 EA 7121.24
SP-O1002696 B12 P W BADGER ORION AMR 98 33.741 EA 3306.62 CB16GP B16GP CNCRT LID W/ PROBE 5 45.650 EA 228.25
CB30DP B30D CNCRT LID W/ PROBE H 4 60.853 EA 243.41
CB36DP B-36DP CNCRT LID W/ PROBE H 7 92.600 EA 648.20
Net Total: $20515.38
Tax: $1692.52
Freight: $0.00
Total: $22207.90
Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. QUOTES FOR PRODUCTS SHIPPED FOR RESALE Due to the uncertain impact of potential tariffs, Ferguson's quotation/proposal has not included any provision or contingency for future tariffs or increase of existing tariffs. Ferguson reserves the right to adjust prices to reflect the impact of any new or increased tariffs that affect our costs at the time of shipment.
Ferguson will provide notice of any such adjustments along with documentation supporting the changes.
CONTRACTOR CUSTOMERS: IF YOU HAVE DBE/MBE/WBE//VBE/SDVBE/SBE GOOD FAITH EFFORTS DIVERSITY GOALS/ REQUIREMENTS ON A
FEDERAL, STATE, LOCAL GOVERNMENT, PRIVATE SECTOR PROJECT, PLEASE CONTACT YOUR BRANCH SALES REPRESENATIVE IMMEDIATELY PRIOR TO RECEIVING A QUOTE/ORDER.
ARE NOT FIRM UNLESS NOTED OTHERWISE.
https://www.ferguson.com/content/website-info/terms-of-sale Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon Local, State and Federal laws governing type of products that can be sold or put into commerce. This Quote is offered contingent upon the Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or on the web at
Govt Buyers: All items are open market unless noted otherwise.
14:23:50 AUG 25 2025
FERGUSON WATERWORKS #2777
Price Quotation
Fax: 661-397-7429
Reference No: B016491
HOW ARE WE DOING? WE WANT YOUR FEEDBACK!
Scan the QR code or use the link below to
complete a survey about your bids:
https://survey.medallia.com/?bidsorder&fc=2777&on=2549
CONSENT CALENDAR
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Giovanni Perez, Economic Development Coordinator SUBJECT: DECLARE SURPLUS RAIL MOVER EQUIPMENT
AUTHORIZATION
RECOMMENDATION
Council find the action is not defined as a "project" per Section 15378(b)(5) of the CEQA Guidelines; declare the list of equipment in this item as surplus property.
BACKGROUND
As part of the City's ongoing reassessment of property and land uses, Staff identified the need to remove two unused rail car movers currently stored on city land at the Wonderful Logistics Center. These units have been out of service for several years, and given that the City does not plan to operate a rail terminal for its own use, there is no longer a municipal purpose for retaining them. Clearing this equipment is a necessary step in preparing the site for future utilization. The rail movers were originally purchased in 2008 and 2012 and are identified as follows:
• Rail King model RK330, Serial Number RCM-706
• Rail King model RK330 G5, Derial Number RCM932-5
FISCAL IMPACT
No fiscal impact for this item.
CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines because the action is the approval to declare surplus equipment for disposal or sale and therefore, it is organizational and administrative activity that will not result in direct or indirect physical changes to the environment that have not already been previously analyzed and not subject to CEQA.
APPROVED BY THE CITY ATTORNEY
No
ATTACHMENTS
None
DECLARE SURPLUS RAIL MOVER EQUIPMENT AUTHORIZATION
- 2 -
CONSENT CALENDAR
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Giovanni Perez, Economic Development Coordinator SUBJECT: SALE OF TWO RAIL KING RAIL CAR MOVERS AUTHORIZATION
RECOMMENDATION
Council find the action is not defined as a “project” per Section 15378(b)(4) of the CEQA Guidelines; approve the sale of two surplus Rail King rail car movers to Pacific West Systems in the amount of $170,000; and authorize the City Manager, or designee, to execute all necessary documents to complete the transaction
BACKGROUND
The two Rail King rail car mover units, originally purchased in 2008 and 2012, were previously utilized for rail operations but have not been in service for several years.
With no municipal rail terminal operations planned, the equipment no longer has a City use and has been declared surplus.
Staff received an offer in July 2025 from Pacific West Systems to purchase both rail car movers for a total of $170,000. The purchase offer is attached to this staff report. Staff reviewed the offer and determined that it reflects a fair and reasonable value for the equipment, given its age and condition.
Surplus Equipment:
• Rail King model RK330, Serial Number RCM-706
• Rail King model RK330 G5, Derial Number RCM932-5
Unless otherwise directed, the sale proceeds will be directed to the City's General Fund.
FISCAL IMPACT
The transaction will generate $170,000 in one-time revenue for the City's general fund for Fiscal Year 2025-2026.
CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(4) of the CEQA Guidelines because the action is the approval of the sale of two rail car movers and therefore, it is
SALE OF TWO RAIL KING RAIL CAR MOVERS AUTHORIZATION
- 2 -
the creation of a governmental funding mechanism or other fiscal activity that does not involve any commitment to a specific project that can result in a potentially significant impact and not subject to CEQA.
APPROVED BY THE CITY ATTORNEY
No
ATTACHMENTS
1. Rail King Railcar Mover Purchase Proposal
Pacific West Systems, Inc.
PO Box 807, Mentone, CA 92359-0807
Telephone: 909-793-4403 Fax: 909-793-4459
www:PacificWestSystems.com
July 8, 2025
City of Shafter
Attn: Kamal Siada
336 Pacific Avenue
Shafter, CA 93263
We are pleased to provide the following proposal to purchase two Rail King railcar movers. Our company is the Rail King dealer for western United States and provides railcar mover services throughout the West. We have specialized in railcar movers for 24 years.
Your Rail King Equipment
Your Rail King Railcar Movers have sat idle for multiple years and this deteriorates the equipment. We will purchase them from you.
Rail King Price Offer
We will purchase your Rail King model RK330, serial number RCM-706 and your Rail King model RK330 G5, serial number RCM932-5 for $170,000.00.
Thanks for your consideration.
Tom Sillers
Railcar Mover Specialist
CONSENT CALENDAR
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Johnny Rubio, IT Director
SUBJECT: MICROSOFT OFFICE 365 SUBSCRIPTION RENEWAL
APPROVAL
RECOMMENDATION
Council find the action is not defined as a “project” per Section 15378(b)(4) of the CEQA Guidelines; approve the renewal of the Microsoft Office 365 annual subscription in the amount of $22,898.04.
BACKGROUND
In 2020, the City secured a five-year Microsoft 365 (Office 365) subscription through AMS.NET using CARES Act funding, as email communications were eligible under program guidelines. Over the term, Microsoft price adjustments have resulted in periodic true-up charges, however, there have been no service interruptions. City Staff rely daily on the Microsoft 365 suite to conduct operations and serve residents.
AMS.NET, now MGT, will continue to provide the annual subscription, which is scheduled to renew on September 23, 2025.
FISCAL IMPACT
The $22,989.04 cost for the Microsoft 365 (Office 365) subscription renewal can be accommodated within the current fiscal-year IT budget.
CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(4) of the CEQA Guidelines because the action is the approval of a subscription renewal for Microsoft Office 365 and therefore, it is the creation of a governmental funding mechanism or other fiscal activity that does not involve any commitment to a specific project that can result in a potentially significant impact and not subject to CEQA.
APPROVED BY THE CITY ATTORNEY
No
ATTACHMENTS
1. Quote
SAAS SUBSCRIPTION AGREEMENT- ANNUAL:
City of Shafter - Microsoft 365 - Renewal -
Annual Prepaid
City of Shafter
Quote #Q-00087663
#Q-00087663 | Page 1
AMS.NET, LLC. D/B/A MGT Impact Solutions
502 Commerce Way, Livermore, CA 94551
(925) 245-6100 | Fax (925) 245-6150
www.mgt.us
Quote# Q-00087663
Introduction
At AMS.NET, LLC. D/B/A MGT Impact Solutions, we are trusted advisors driven by social impact. Our specialized technology and advisory solutions address the mission-critical problems that live at the top of our client’s leadership agenda. From aging technology and cybersecurity threats to budgetary constraints, we take on the toughest challenges – and succeed together.
Our suite of comprehensive technology solutions, spanning cybersecurity, managed services, SaaS, physical security, network infrastructure, cloud and data, communications, and more empower you to effortlessly conquer your toughest technology obstacles. Please refer to our customer price quote for specific manufacturers, parts, pricing and professional services proposed as a part of this solution.
A Social Impact Commitment
DEFINED BY IMPACT
We understand how important flexibility and scalability is to City of Shafter, and for this reason we are providing a predictable Microsoft subscription technology solution that supports your organizations goals and helps you improve the communities your serve.
MGT’s Expertise
MGT brings 50 years of experience and more than 900 professionals driving positive social change with technology and advisory solutions for education, government, and enterprise companies. We have a national presence with local engineering and cabling resources.
Strategy & Implementation
Working alongside an organization’s
C-suite, we help leaders co-create
strategy through organizational
reviews and data analytics to create
actionable roadmaps for success.
Cybersecurity & Resilience
From real-time, 24/7 monitoring to
proactive threat detection and rapid
incident response, we can give you
the tools to heighten your network’s
security posture and keep it there.
IT Infrastructure & Digital
We provide engineering expertise to
modernize IT infrastructure and ensure
your technology implementation is
properly designed, integrated,
modernized, and maintained.
Performance & Operations
Bridging the gap between strategy and
enduring change, we support efficient
revenue allocation, promote economic
development, and create fairness in
hiring and contracting systems.
#Q-00087663 | Page 2
AMS.NET, LLC. D/B/A MGT Impact Solutions
502 Commerce Way, Livermore, CA 94551
(925) 245-6100 | Fax (925) 245-6150
www.mgt.us
Quote# Q-00087663
Billing Information
AMS.NET, LLC. will invoice against the contract once open purchase order is received and processed by AMS.NET, LLC. Failure to pay invoices may lead to cancellation of manufacturer subscription and early termination penalty. Prices below reflect a discount off current manufacturer published list prices and are subject to change monthly. If Microsoft increases or decreases the list price, AMS.NET, LLC. will adjust the monthly unit price using the same discount off list. Any licenses added during the month will be reflected in the next month’s bill. Removing licenses are subject to the contract type and terms.
SaaS Contract Cost Summary:
To add or remove licenses during the agreement, please email [email protected]. At the end of the initial term, current agreement will be automatically renewed to a month-to-month subscription. Please provide a new open purchase order for month-to-month agreement and current subscription counts to our renewals team, at [email protected]. To cancel your subscription at the end of the initial term, please notify Renewals by email, no later than 30-days prior to end-of term.
AMS.NET, LLC. will invoice against the original contract once an open purchase order is received and processed by the AMS.NET, LLC. internal team. Above costs are estimates and customer is responsible for any Microsoft increases or licenses added. Legacy CSP contracts can reduce seats at any time. NCE contracts can only cancel/reduce seats/downgrade within the cancellation window. For NCE contracts, there will be no charge if cancelled within 24 hours, a prorated charge if canceled within 25-72 hours and there is no cancel option after 72 hours after activation.
Failure to pay invoices may lead to cancellation of the manufacturer subscription and early termination penalties may apply. Customer is subject to early termination fees for the remaining value on the contract if contract is terminated before the contract end date. To cancel the subscription, please email Renewals at [email protected], in writing 30-days prior to the end-of-term. AMS.NET, LLC. will send out customer reminders notifying them of the impending renewal and the customer must provide an open purchase order for the month-to-month renewal term to AMS.NET, LLC. Renewals at [email protected]. Agreements automatically renew into a month-to-month agreement unless specified as only a 1 year agreement.
Termination without cause- Either party may terminate this Agreement without case on 30 day’s notice. Termination without cause will not affect Customer’s perpetual licenses, and license granted on a subscription basis will continue for the duration of the subscription period(s), subject to the terms of this Agreement.
Termination for cause- Without limiting other remedies it may have, either party may terminate this Agreement on 30 days’ notice for material breach if the other party fails to cure the breach within the 30-day notice period. Upon such termination, the following will apply:
1. All licenses granted under this Agreement will terminate immediately except for fully-paid, perpetual licenses.
2. All amounts due under any unpaid invoices shall become due and payable immediately. For metered Products billed periodically based on usage, Customer must immediately pay for unpaid usage as of the termination date.
Contract Term 1 Year Estimated
Annual Total
$22,898.04
Billing Term Prepaid Estimated
Total Contract
$22,898.04
#Q-00087663 | Page 3
AMS.NET, LLC. D/B/A MGT Impact Solutions
502 Commerce Way, Livermore, CA 94551
(925) 245-6100 | Fax (925) 245-6150
www.mgt.us
Quote# Q-00087663
3. If Microsoft is in breach, Customer will receive a credit for any subscription fees, including amounts paid in advance for unused consumption for any usage period after the termination date.
#Q-00087663 | Page 4
AMS.NET, LLC. D/B/A MGT Impact Solutions
502 Commerce Way, Livermore, CA 94551
(925) 245-6100 | Fax (925) 245-6150
www.mgt.us
Quote# Q-00087663
Estimated
Contract Start 9/24/2025
Estimated
Contract
Expiration
9/23/2026
Contract Term 1 Year
Billing Term Prepaid
Modified 9/3/2025
Account Mgr.
Sean Harrington
(559) 547-2867
[email protected]
Customer
City of Shafter
336 Pacific Ave
Shafter CA, 93263-2047 United States
ATTN: Johnny Rubio
Quote Description
City of Shafter - Microsoft 365 - Renewal - Annual Prepaid due to auto renew Sept 2025.
Inside
Account Mgr.
Ken Falconitin
(925) 245-6119
[email protected]
Line Item
Description Qty ServiceTerm
Monthly
Unit Price
Qty
Years Extended Price
1 MST-CFQ7TTC0HDB0-0011-YEAR-GOVERN-12
Microsoft Project Plan 3 - Subscription license - hosted - Government Community Cloud, NCE - Annual Commit
1 1 Year $28.36 1 $340.32
2 MST-CFQ7TTC0HL8W-000M-YEAR-GOVERN-12
NCE Power BI Premium Per User (GCC) Annual Commit
1 1 Year $18.91 1 $226.92
3 MST-CFQ7TTC0H9MP-0009-YEAR-GOVERN-12
Power BI Pro - Subscription license - 1 user - hosted - Government Community Cloud, NCE
9 1 Year $9.45 1 $1,020.60
4 MST-CFQ7TTC0LH16-000T-YEAR-GOVERN-12
NCE Exchange Online (Plan 1) (GCC) Annual Commit
99 1 Year $3.80 1 $4,514.40
5 MST-CFQ7TTC0JXCZ-000F-YEAR-GOVERN-12
NCE Microsoft Teams Audio Conferencing with dial-out
to USA/CAN (GCC) Annual Commit
1 1 Year $0.00 1 $0.00
6 MST-CFQ7TTC0J1ZM-0003-YEAR-GOVERN-12
NCE Microsoft 365 G3 (GCC) Annual Commit
35 1 Year $34.05 1 $14,301.00
7 MST-CFQ7TTC0J1Z9-0007-YEAR-GOVERN-12
Microsoft Office 365 G1 - subscription license - 1 license 22 1 Year $9.45 1 $2,494.80
#Q-00087663 | Page 5
AMS.NET, LLC. D/B/A MGT Impact Solutions
502 Commerce Way, Livermore, CA 94551
(925) 245-6100 | Fax (925) 245-6150
www.mgt.us
Quote# Q-00087663
Order Summary
Estimated
Annual Total $22,898.04
Estimated
Contract Total $22,898.04
#Q-00087663 | Page 6
AMS.NET, LLC. D/B/A MGT Impact Solutions
502 Commerce Way, Livermore, CA 94551
(925) 245-6100 | Fax (925) 245-6150
www.mgt.us
Quote# Q-00087663
Sign and return this page to your account manager to accept this proposal for SaaS Subscription- Annual.
I, the undersigned (“Customer”), hereby accept this proposal for SaaS Services(s) as detailed in the quote number Q-00087663. I also agree to the following:
Terms and Conditions
Payment Conditions
\
Yes, Customer chooses to purchase SaaS services from AMS.NET, LLC. Customer understands that Customer will be responsible to pay the full costs of the services until contract has expired. Fees are non-refundable and payment obligations are noncancelable, except as provided in your purchase terms or where prohibited by law.
Term: 1 Year
Microsoft services purchased from AMS.NET, LLC. requires customer to accept the Microsoft Customer agreement located at: https://www.microsoft.com/licensing/docs/customeragreement. This Microsoft Customer Agreement describes the rights and responsibilities related to the Cloud Service(s) You purchase from Microsoft or an Approved Source and is between You and Microsoft. Both the terms in this Agreement and the Agreement between you and Microsoft for the Cloud Services must be accepted.
Year 1 Cost - Quote Total Qty Service
Term
Monthly
Unit Price
Qty
Years
Extended
Price
MST-CFQ7TTC0HDB0-0011-YEAR-GOVERN12
Microsoft Project Plan 3 - Subscription license -
hosted - Government Community Cloud, NCE -
Annual Commit
1 1 Year $28.36 1 $340.32
MST-CFQ7TTC0HL8W-000M-YEAR-GOVERN12
NCE Power BI Premium Per User (GCC) Annual
Commit
1 1 Year $18.91 1 $226.92
MST-CFQ7TTC0H9MP-0009-YEAR-GOVERN12
Power BI Pro - Subscription license - 1 user -
hosted - Government Community Cloud, NCE
9 1 Year $9.45 1 $1,020.60
MST-CFQ7TTC0LH16-000T-YEAR-GOVERN12
NCE Exchange Online (Plan 1) (GCC) Annual
Commit
99 1 Year $3.80 1 $4,514.40
MST-CFQ7TTC0JXCZ-000F-YEAR-GOVERN12
NCE Microsoft Teams Audio Conferencing with
dial-out to USA/CAN (GCC) Annual Commit
1 1 Year $0.00 1 $0.00
MST-CFQ7TTC0J1ZM-0003-YEAR-GOVERN12
NCE Microsoft 365 G3 (GCC) Annual Commit
35 1 Year $34.05 1 $14,301.00
#Q-00087663 | Page 7
AMS.NET, LLC. D/B/A MGT Impact Solutions
502 Commerce Way, Livermore, CA 94551
(925) 245-6100 | Fax (925) 245-6150
www.mgt.us
Quote# Q-00087663
MST-CFQ7TTC0J1Z9-0007-YEAR-GOVERN-12
Microsoft Office 365 G1 - subscription license -
1 license
22 1 Year $9.45 1 $2,494.80
Estimated Annual
Total
$22,898.04
Estimated
Contract Total
$22,898.04
#Q-00087663 | Page 8
AMS.NET, LLC. D/B/A MGT Impact Solutions
502 Commerce Way, Livermore, CA 94551
(925) 245-6100 | Fax (925) 245-6150
www.mgt.us
Quote# Q-00087663
This Agreement may be executed in one or more counterparts, each of which will be deemed an original but all of which together will constitute one and the same instrument. Delivery of an executed counterpart of a signature page to this Agreement by facsimile, .pdf or other electronic means will be as binding and effective as delivery of a manually executed counterpart to the Agreement.
By signing below, each of the Parties, intending to be legally bound thereby, agrees to the terms of this Agreement.
Submitted by Acknowledged and Agreed
AMS.NET, LLC. City of Shafter
Signature \s1\ Signature \s2\
Name \n1\ Name \n2\
Title \t1\ Title \t2\
Date \d1\ Date \d2\
Payment Terms and Conditions
1. AMS.NET, LLC. will require a purchase order referencing this Quote # and an authorized representative must sign this proposal.
2. Payment Terms are NET 30. Payments made beyond 30 days are subject to a finance charge of 1.5% per month. Customer agrees to pay all collection costs and attorney fees or late payments if applicable. In the event that a site’s readiness is delayed by the customer, customer agrees to accept and pay invoices that reflect services already received.
3. Shipping charges and sales tax will not be added to this order as these services on non-taxable.
4. The laws of the state where the item is shipped will apply to this sale.
5. The term “start date” means the first business day on which the service starts. Minor omissions or variances in performance of the System that do not materially or adversely affect the operation of the system, shall not be deemed to have postponed the start date. Seller shall use its best efforts to make timely delivery of start date. HOWEVER, ALL STATED
DELIVERY AND START DATES ARE APPROXIMATE AND EXCEPT AS EXPRESSLY PROVIDED IN THIS AGREEMENT, SELLER
SHALL, UNDER NO CIRCUMSTANCE, BE DEEMED TO BE IN DEFAULT HEREUNDER OR BE LIABLE FOR CONSEQUENTIAL, INCIDENTAL OR SPECIAL DAMAGES OR COMMERCIAL LOSS RESULTING FROM DELAYS IN DELIVERY OF START DATE.
6. Early Terminate Fee (ETF): Customer is subject to Early Termination fees for the remaining value on contract if contract is terminated before the contract end date. AMS will deduct contract total minus total paid by customer to calculate value of the ETF. ETF Payment terms are subject to same payment terms listed above.
#Q-00087663 | Page 9
AMS.NET, LLC. D/B/A MGT Impact Solutions
502 Commerce Way, Livermore, CA 94551
(925) 245-6100 | Fax (925) 245-6150
www.mgt.us
Quote# Q-00087663
7. Microsoft services purchased from AMS.NET, LLC. requires customer to accept the Microsoft Customer agreement located on Microsoft’s Website. This Microsoft Customer Agreement describes the rights and responsibilities related to the Cloud Service(s) You purchase from Microsoft or an Approved Source and is between You and Microsoft. The Microsoft Customer Agreement includes the applicable Offer Description(s) located at https://www.microsoft.com/licensing/docs/customeragreement.
8. Prices in quote reflect a discount off current manufacturer published list prices and are subject to change monthly. If Microsoft increases or decreases the list price, AMS.NET, LLC. will adjust the monthly unit price using the same discount off list.
9. AMS.NET, LLC. will invoice against the original contract once an open purchase order is received and processed by the AMS.NET, LLC. internal team. Above costs are estimates and customer is responsible for any Microsoft increases or licenses added or removed. Failure to pay invoices may lead to cancellation of the manufacturer subscription and early termination penalties may apply. Customer is subject to early termination fees for the remaining value on the contract if contract is terminated before the contract end date. To cancel the subscription, please email Renewals at [email protected], in writing 30-days prior to the end-of-term. AMS.NET, LLC. will send out customer reminders notifying them of the impending renewal and the customer must provide an open purchase order for the month-to-month renewal term to AMS.NET, LLC. Renewals at [email protected]. Agreements automatically renew into a month-to-month agreement unless specified as only a 1 year agreement.
Termination without cause- Either party may terminate this Agreement without case on 30 day’s notice. Termination without cause will not affect Customer’s perpetual licenses, and license granted on a subscription basis will continue for the duration of the subscription period(s), subject to the terms of this Agreement.
Termination for cause- Without limiting other remedies it may have, either party may terminate this Agreement on 30 days’ notice for material breach if the other party fails to cure the breach within the 30-day notice period. Upon such termination, the following will apply:
1. All licenses granted under this Agreement will terminate immediately except for fully-paid, perpetual licenses.
2. All amounts due under any unpaid invoices shall become due and payable immediately. For metered Products billed periodically based on usage, Customer must immediately pay for unpaid usage as of the termination date.
3. If Microsoft is in breach, Customer will receive a credit for any subscription fees, including amounts paid in advance for unused consumption for any usage period after the termination date.
AMS.NET, LLC.
Tax ID: 94-3291626
C7 License: 763508
Purchase Order
Please make your purchase order to AMS.NET, LLC. and email it to Sean Harrington at [email protected]. You may also return it by mail to 502 Commerce Way, Livermore, CA 94551
CONSENT CALENDAR
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Michael James, Public Works Director
SUBJECT: HIGHWAY-RAIL GRADE CROSSING CLOSURE AGREEMENT
WITH BNSF AND STATE OF CALIFORNIA (BEECH AVENUE)
APPROVAL
RECOMMENDATION
Council find that the project has already been environmentally cleared per CEQA; approve the Highway-Rail Grade Crossing Closure Agreement between the City of Shafter, the State of California Department of Transportation, and BNSF Railway Company for the permanent closure of the Beech Avenue (Los Angeles Avenue) Public Crossing (U.S. DOT No. 028386G); authorize the Public Works Director to execute the agreement on behalf of the City of Shafter; and authorize the City Attorney to make non-substantive modifications to the agreement as needed to finalize execution.
BACKGROUND
On July 15, 2025, the City Council authorized the Public Works Director to submit a “Request for Authority to Alter Highway-Rail Crossings” to the California Public Utilities Commission (CPUC) supporting the closure of the Beech Avenue at-grade crossing in connection with the planned roundabout at Santa Fe Way and Highway 43. Beech Avenue, as a local roadway, will not close, but Caltrans does intend to terminate its access to a state-controlled intersection. Immediately east of the current at-grade crossing, southbound Beech Avenue traffic will be diverted to eastbound Los Angeles Avenue (and vice versa). This arrangement was approved with the intent of enabling the roundabout project to proceed while expressly preserving the potential to restore the roadway connection in the future, contingent upon construction of a gradeseparated crossing.
To implement the physical closure of the at-grade crossing, a separate agreement is now required among the City of Shafter, the State of California (Caltrans), and the Burlington Northern and Santa Fe Railway Company (BNSF). The proposed HighwayRail Grade Crossing Closure Agreement establishes the terms under which the public crossing identified as U.S. DOT No. 028386G will be permanently vacated and closed.
Although the CPUC application and previous Council actions refer to the location as the Beech Avenue crossing, BNSF designates the same crossing as Los Angeles Avenue due to the roadway’s official name on the east side of the tracks, where Beech Avenue and Los Angeles Avenue merge. Both names reference the same physical crossing and location.
HIGHWAY-RAIL GRADE CROSSING CLOSURE AGREEMENT WITH BNSF AND STATE OF
CALIFORNIA (BEECH AVENUE) APPROVAL
- 2 -
While the new agreement identifies the closure as permanent, the previously approved Request for Authority to Alter Highway-Rail Crossings explicitly allows for a future restoration of the Beech Avenue connection through a grade separation project, subject to environmental review, engineering design, and coordination with BNSF, CPUC, and Caltrans because the City does not have jurisdiction over grade separation projects with railroads and state highways.
FISCAL IMPACT
There is no immediate fiscal impact associated with this agreement. Prior expenditures related to the roundabout design and right-of-way acquisition have been funded through a combination of local traffic impact fees and federal grant proceeds. The closure agreement does not impose any new financial obligation on the City and is consistent with the Council's prior direction.
Under the terms of the agreement, BNSF will provide a one-time payment of $100,000 to the State of California in consideration of the permanent closure and vacation of the public crossing at U.S. DOT No. 028386G (Beech Avenue/Los Angeles Avenue). These funds are intended to offset the costs of physical closure work, including removal of roadway approaches and installation of appropriate end-of-road treatments. The City will coordinate with the State to ensure compliance with all provisions of the agreement and will retain responsibility for maintaining the closure signage and barricades following completion of the work.
CEQA ANALYSIS
The California Department of Transportation (Caltrans) is the lead agency under the California Environmental Quality Act (CEQA) for the roundabout project at Santa Fe Way and Highway 43, which includes the permanent closure of the Beech Avenue (Los Angeles Avenue) at-grade crossing as a project component. The project has already been environmentally cleared by Caltrans. The City of Shafter, acting as a responsible agency under CEQA, has reviewed the lead agency’s determination and finds that no further environmental review is required.
APPROVED BY THE CITY ATTORNEY
Yes
ATTACHMENTS
1. Highway-Rail Grade Crossing Closure Agreement
Contract Number: BF-20553730
1 of 3
HIGHWAY-RAIL GRADE CROSSING CLOSURE AGREEMENT
BNSF File No. BF-20553730
Los Angeles Ave
U.S. DOT No. 028386G
Railroad Line Segment: 7200
Railroad Milepost: 904.409
Bakersfield Subdivision
THIS AGREEMENT, made and entered into by and between the BNSF RAILWAY COMPANY, a Delaware corporation, hereinafter referred to as the "BNSF", the City of Shafter, a political subdivision of the State of California “CITY”, and the State of California, acting by and through its Department of Transportation, hereinafter referred to as the "STATE", and collectively referred to herein as “The Parties.” WITNESSETH:
WHEREAS, elimination of a grade crossing by closing the road includes the abandonment and permanent vacating of roadway right-of-way across the railroad rightof-way, and WHEREAS, the BNSF agrees to pay the STATE a closure fee a for eliminating crossing DOT No. 028386G by closing the road, and
WHEREAS, the STATE in cooperation with CITY and BNSF will permanently close the Los Angeles Ave grade crossing DOT No. 028386G and
NOW THEREFORE, in consideration of these facts, the parties hereto agree as follows:
SECTION 1. The STATE, and CITY after having executed this agreement, and after taking all actions necessary to permanently close and vacate the Los Angeles Ave Public Crossing DOT No. 028386G and easement across the BNSF’s property, and after removing both roadway approaches and installing the appropriate signage and end-of-road treatment in the form of either permanent barricades or natural barricades (re-establishing parallel ditch line, etc.) – located outside of the BNSF right-of-way line, will submit an invoice statement (including STATE’s Tax ID #) to the BNSF in the amount of One Hundred Thousand and No/100 [$100,000.00]. The STATE and City will coordinate with the BNSF Field Representative in advance of
Contract Number: BF-20553730
2 of 3
removing roadway approaches to coordinate scheduling of work next to tracks.
SECTION 2. The BNSF hereby agrees to pay the STATE the sum of One Hundred Thousand and No/100 [$100,000.00] in consideration of the permanent closure and vacation of the Los Angeles Ave Public Crossing DOT No. 028386G and relinquishment of the easement across the BNSF property, upon the receipt of the above referenced invoice statement.
SECTION 3. BNSF will do all railroad work set forth in Exhibit A on an actual cost basis, when BNSF, in its sole discretion, determines it is required by its labor agreements to perform such work with its own employees working under applicable collective bargaining agreements.
SECTION 4. STATE must reimburse BNSF in full for the actual costs of all work performed by BNSF provided such amount does not exceed the amount set forth in Exhibit B (including applicable sales and use taxes, but excluding any tax based upon income).
SECTION 5. The CITY agrees to own and maintain the appropriate signage and end-of-road treatment.
SECTION 6. The STATE and CITY agree that this crossing will remain closed and will not be re-opened by the STATE or CITY.
SECTION 7. BNSF agrees to own and maintain the area covered by the easement relinquishment.
SIGNATURE PAGE TO FOLLOW
Contract Number: BF-20553730
3 of 3
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed by their proper officials thereunto duly authorized as the dates below indicated.
EXECUTED by the BNSF on [____________________].
BNSF RAILWAY COMPANY State of California
Signature: Signature:
Printed Name: Printed Name:
Title: __________________ Title:
CITY OF SHAFTER
Signatue:________________________
Printed Name:____________________
Title:____________________________
CONSENT CALENDAR
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Rogelio Sanchez, Finance Director, Isarel Perez-Hernandez, CMT, Deputy Finance Director
SUBJECT: STATE OF GOOD REPAIRS PROGRAM (SGR) FY 2025-26
PROJECT LIST AND GRANT AWARD RESOLUTION ADOPTION
RECOMMENDATION
Council find action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines; adopt Resolution No. 3042, a Resolution Authorizing the Project List for the Fiscal Year 2025-26 Grant Award from the California State of Good Repairs Program and Authorize the City Manager or Designee to Execute Budget Amendments, Grant Agreements, and Authorize the Execution of the Certifications and Assurances Form from the California State of Good Repairs Program.
BACKGROUND
California Department of Transportation administers SB1- State Good Repair (SGR) Program funds, which are made available for capital projects that maintain the public transit system in a state of good repair. The SGR Program is one of two programs that allocate SB1 funds to transit agencies through the State Transit Assistance Formula.
Funds allocated to public transit operators are based on the local needs. The goal of the SGR Program is to provide funding for capital assistance, rehabilitate and modernize California’s existing local transit systems.
Eligible Recipients
According to the California Department of Transportation SGR program guidelines pursuant to PUC Section 99314, the regional entities [KernCOG] shall suballocate funds to:
• Transit operators listed on the SCO’s SGR Allocation Estimate letter. • In addition, pursuant to PUC Section 99313, eligible agencies may participate in the regional process, as determined by the applicable regional entity, and may therefore also be an eligible recipient of PUC Section 99313 funding.
All SGR eligible agencies that are identified in the SCO’s annual SGR Allocation Estimate letter, must prepare and submit a project list to qualify for funding. Eligible recipients prepare and submit their project list to their respective regional entity. The regional entity shall review the project lists as submitted by the SGR eligible agencies in their region. If the projects listed are in compliance with these Guidelines, and no additional information is needed, the regional entity shall forward the project
STATE OF GOOD REPAIRS PROGRAM (SGR) FY 2025-26 PROJECT LIST AND GRANT AWARD
RESOLUTION ADOPTION
- 2 -
list(s) to Caltrans for review.
Eligible recipients assume responsibility and accountability for the use and expenditure of SGR funds and must comply with all relevant federal and state laws, regulations, policies and procedures.
Eligible Projects
SGR funds are made available for capital projects that maintain the public transit system in a state of good repair. PUC Section 99212.1 (c) lists the projects eligible for SGR funding as follows:
• Transit capital projects or services to maintain or repair a transit operator’s existing transit vehicle fleet or transit facilities, including the rehabilitation and/or modernization of the existing vehicles or facilities.
• The design, acquisition, and construction of new vehicles or facilities that improve existing transit services.
• Transit services that complement local efforts for repair and improvement of local transportation infrastructure.
Examples include, but are not limited to, the following:
• Replacement or rehabilitation of:
• Rolling stock
• Passenger stations and terminals
• Security equipment and systems
• Maintenance facilities and equipment
• Ferry vessels
• Rail
Transit Preventative Maintenance
• Preventative maintenance is only to maintain existing infrastructure and vehicles in a state of good repair, essentially repair and rehabilitation. Normal maintenance such as oil changes and other regularly scheduled vehicle maintenance are to be covered under the transit agency’s normal operating costs and are not eligible for SGR funding. • Public and Staff Safety
• New transit facilities or equipment needed to maintain existing transit service(s) Project List Scope
The City of Shafter is proposing to utilize the SGR FY 2025-26 estimated amount of $39,921 to construct a Transit Metal Carport near the public works yard. The Shafter transit department has recently replaced its fleet to include electric vans to provide safe, reliable and environmentally friendly transportation services to the community. To ensure the long-term preservation and performance of these vehicles it’s necessary to construct a protective metal carport structure by the public works yard.
Prior to grant award apportionment, the Department of Transportation requires all potential recipient agencies to submit a board resolution and project list to the Department of Transportation prior to receiving their allocation.
STATE OF GOOD REPAIRS PROGRAM (SGR) FY 2025-26 PROJECT LIST AND GRANT AWARD
RESOLUTION ADOPTION
- 3 -
FISCAL IMPACT
The City of Shafter would receive grant funds estimated at $39,921.
CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines because the action is approval of a project list and grant award for SGR for a project that will undergo further CEQA analysis and therefore, it is organizational and administrative activity that will not result in direct or indirect physical changes to the environment and not subject to CEQA.
APPROVED BY THE CITY ATTORNEY
No
ATTACHMENTS
1. Exhibit A - SGR FY2025-26 Project List
2. Resolution No. 3042
EXHIBIT A
City Manager
(661) 746-5000
Fax (661) 746-0607
Public Works/Engineering
(661) 746-5004
Fax (661) 746-9125
Planning/Building
(661) 746-5002
Fax (661) 746-9125
Human Resources
(661) 746-5003
Fax (661) 746-2645
Finance
(661) 746-5001
Fax (661) 746-1002
336 Pacific Avenue • Shafter, California 93263
FY 2025-2026 STATE OF GOOD REPAIRS PROGRAM LIST
The fiscal year 2025-2026 list of projects planned to be funded by the State of Good Repair Program to support capital projects that maintain the public transit system in state of good repair:
• PROJECT TITLE: Transit Metal Carport Project
• PROJECT SCOPE: The City of Shafter is proposing to utilize the SGR FY 2025-26 estimated amount of $39,921 to construct a Transit Metal Carport near the public works yard. The Shafter transit department recently replaced its fleet to include electric vans to provide safe, reliable and environmentally friendly transportation services to the community. To ensure the long-term preservation and performance of these vehicles it’s necessary to construct a protective metal carport structure by the public works yard.
RESOLUTION NO. 3042
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHAFTER APPROVING THE PROJECT LIST FOR THE FISCAL YEAR 2025-26 GRANT
AWARD FROM THE CALIFORNIA STATE OF GOOD REPAIRS PROGRAM AND
AUTHORIZE THE CITY MANAGER OR DESIGNEE TO EXECUTE GRANT
AGREEMENTS, BUDGET ADJUSTMENTS AND AUTHORIZE THE EXECUTION OF
THE CERTIFICATIONS AND ASSURANCES FORM FROM THE CALIFORNIA
STATE OF GOOD REPAIRS PROGRAM
WHEREAS, the City Council of the City of Shafter is an eligible project sponsor and may receive funding from the State Good Repair for eligible transit capital projects; and WHEREAS, the City of Shafter concurs with and approves the identified project below in section 4 of this resolution for the State of Good Repair Program funds; and WHEREAS, the Road Repair and Accountability Act 2017, establishing the State of Good Repair (SGR) program to fund eligible transit maintenance, rehabilitation and capital project activities that maintain the public transit system in a state of good repair; and NOW THEREFORE BE IT RESOLVED, DETERMINED AND ORDERED by the City Council of the City of Shafter, California, that the City Manager or Finance Director or Designee is hereby authorized to:
SECTION 1: The City Council of the City of Shafter hereby approves the SB1 State of Good Repair Project List Exhibit A for FY 2025-26.
SECTION 2: The fund recipient agrees to comply with all conditions and requirements set forth in the Certification and Assurances document and applicable statutes, regulations and guidelines for all SGR funded capital projects.
SECTION 3: The City Manager or Finance Director or Designee is hereby authorized to submit a request for Scheduled Allocation of the SB1 State of Good Repair funds and to execute the related grant applications, forms, agreements and budget appropriations.
SECTION 4: The fiscal year 2025-2026 list of projects planned to be funded by the State of Good Repair Program to support capital projects that maintain the public transit system in state of good repair only include the construction of a Transit Metal Carport by the public works yard.
PASSED, APPROVED AND ADOPTED ON THIS 16
th DAY OF SEPTEMBER, 2025.
_______________________________
Chad Givens, Mayor
ATTEST
_______________________________
Yazmina Pallares, City Clerk
Shafter City Council Resolution No. 3042
September 16, 2025
APPROVED AS TO FORM:
_____________________________
Marco A. Martinez, City Attorney
CONSENT CALENDAR
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Lance Lippincott, City Manager
SUBJECT: REQUEST FOR SUPPORT FROM THE STATE ATTORNEY
GENERAL TO THE CITY OF SHAFTER FOR THE CALIFORNIA
STATE APPLICATION SEEKING FUNDING FROM THE
NATIONAL OPIOID SETTLEMENT WITH PURDUE PHARMA L.P.
RECOMMENDATION
Council find the action is not defined as a “project” per Section 15378(b)(5) of the California Environmental Quality Act Guidelines; authorize staff to execute all materials necessary to support the State of California application for funding from the Purdue Pharma L.P. opioid settlement.
BACKGROUND
On September 9, 2025, general communications were received from the State Attorney General's Office to inform the City of Shafter that they had not received a commitment of support for the State's application for federal opioid settlement funds. The State anticipates requesting up to $510 million for opiod abatement, with 85% of the abatement funds received by California going directly to cities and counties. Any money not allocated through the national process will be allocated back to the defendants. Kern County is considered an area of high opioid used compared to the California average, and it is likely that the City of Shafter would be well positioned to apply for these funds if the State's application is successful.
FISCAL IMPACT
There is no fiscal impact to this item.
CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines because the action is approval of a request for support from the state attorney general for a state application and therefore, it is organizational and administrative activity that will not result in direct or indirect physical changes to the environment and not subject to CEQA.
APPROVED BY THE CITY ATTORNEY
No
ATTACHMENTS
REQUEST FOR SUPPORT FROM THE STATE ATTORNEY GENERAL TO THE CITY OF SHAFTER
FOR THE CALIFORNIA STATE APPLICATION SEEKING FUNDING FROM THE NATIONAL OPIOID SETTLEMENT WITH PURDUE PHARMA L.P.
- 2 -
None
PUBLIC HEARINGS
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Clarisa Olaguez, Associate Planner
SUBJECT: TENTATIVE TRACT MAP NO. 7207 EXTENSION OF TIME
APPROVAL
RECOMMENDATION
Council find the action does not require additional CEQA review; conduct public hearing and adopt Resolution No. 3040, a Resolution of the City Council of the City of Shafter, approving a two (2) year extension of time for Tentative Tract Map No. 7207 located between Elizabeth Avenue and West Riverside Street, approximately 1/3 west of South Shafter Avenue, in the City of Shafter, subject to the conditions approved by the City Council on August 18, 2009, to now expire on August 18, 2027.
BACKGROUND
Tentative Tract Map 7207 was originally approved by the City Council on August 18, 2009. Tentative Tract 7207 is located approximately 1/3 west of South Shafter Avenue between Elizabeth Avenue and West Riverside Street and proposes to subdivide 20 acres into 23 single-family residential lots, ranging in size from 10,886 square feet to 45,706 square feet.
The original expiration date for Tentative Tract Map 7207 was August 18, 2011.
However, due to the slow economy in the mid-2000s, the California State Legislature enacted multiple statutory extensions, which collectively added eight years to the life of previously approved subdivision maps. In addition to the legislative extensions, the City Council approved two discretionary time extensions, with the most recent granted on June 7, 2022. This extended the expiration date to August 18, 2025. In recognition that the expiration date has past, under the Shafter Subdivision Ordinance and Subdivision Map Act, a map remains active if a discretionary extension is requested prior to the expiration date until a final decision is made by City Council.
Therefore, the applicant is requesting approval of the second two-year discretionary time extension, which would move the map expiration date to August 18, 2027. Should the map not be recorded by that date, the applicant may apply for one more discretionary extension or the map would expire.
The Planning Commission considered the proposed extension of time on August 12, 2025, and recommended that the City Council approve the requested two-year extension of time to file a final map for Tentative Tract Map 7207, subject to the
TENTATIVE TRACT MAP NO. 7207 EXTENSION OF TIME APPROVAL - 2 -
conditions approved by the City Council on August 18, 2009, to now expire on August 18, 2027.
FISCAL IMPACT
There is no fiscal impact directly resulting from the approval of this tentative tract map extension.
CEQA ANALYSIS
The City of Shafter adopted a Negative Declaration for Tentative Tract No. 7207 on August 18, 2009 (Resolution 09-2056). Therefore, no additional California Environmental Quality Act analysis or documentation is required for the extension of time.
APPROVED BY THE CITY ATTORNEY
No
ATTACHMENTS
1. Vicinity Map
2. Resolution No. 3040
3. Exhibit "A" of Resolution No. 3040
4. Exhibit "B" of Resolution No. 3040
PLANADA
WAHOO CT
E RIVERSIDE
S SHAFTER AVE
W RIVERSIDE ST THOMAS LN
MARION ST
BRITTANY ST
CLARENCE ST
ELMENDORF CT
OAKMONT ST
ELIZABETH AVE
EXHIBIT 1: TTM 7207 VICINITY MAP
Copyright nearmap 2015
Override 1 Road Centerlines
Arterial
Local
7/21/2025, 2:01:22 PM
0 0.03 0.06 0.12 mi
0 0.05 0.1 0.2 km
1:4,514
City of Shafter
City of Shafter | Source: U.S. Census Bureau | County of Kern Planning Department, Bakersfield, California. | Kern County Assessor's Office, Mapping Section. 7207
EXHIBIT 2
RESOLUTION NO. 3040
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHAFTER APPROVING A TWO (2) YEAR EXTENSION OF TIME FOR TENTATIVE TRACT MAP NO. 7207 LOCATED BETWEEN ELIZABETH AVENUE AND WEST
RIVERSIDE STREET, APPROXIMATELY 1/3 MILE WEST OF SOUTH SHAFTER AVENUE, WITHIN THE CITY OF SHAFTER.
WHEREAS, on July 10, 2025, Gregory Black on behalf of Mehdi Davary, the property owner of Tentative Tract Map No. 7207, requested approval of an extension of time to record a final map on that certain property in the City of Shafter as shown on attached Exhibit “A”. The extension of time request was submitted prior to the expiration of the map and is being considered within the 60-day time period allowed by the Subdivision Map Act; and WHEREAS, Tentative Tract Map No. 7207, proposing to subdivide 20 acres into 23 single-family residential lots, ranging in size from 10,886 square feet to 45,706 square feet was approved by the City Council on August 18, 2009, per Resolution No. 09-2056; and WHEREAS, the City of Shafter adopted a Negative Declaration for Tentative Tract Map No. 7207 on August 18, 2009 (Resolution 09-2056), therefore no additional California Environmental Quality Act analysis or documentation is required for the extension of time; and WHEREAS, Tentative Tract Map No. 7207 was approved with a condition requiring the final map to be recorded within two years; and
WHEREAS, on July 15, 2011, the state legislature amended the Subdivision Map Act to provide an additional twenty-four (24) month extension of time for all approved subdivision maps, thereby extending the recordation of the map to August 18, 2015; and WHEREAS, July 11, 2013, the state legislature amended the Subdivision Map Act to provide an additional twenty-four (24) month extension of time for all approved subdivision maps, thereby extending the recordation of the map to August 18, 2017; and WHEREAS, on October 10, 2015, the state legislature amended the Subdivision Map Act to provide an additional twenty-four (24) month extension of time for all approved subdivision maps, thereby extending the recordation of the map to August 18, 2019; and WHEREAS, on August 7, 2018, the City Council approved Ordinance 706 amending an Addendum to the Negative Declaration adopted for Tentative Tract No. 7207 for Development Agreement No. 17-15, thereby extending the Tentative Tract Map expiration date to August 18, 2021; and
WHEREAS, on January 1, 2021, the state legislature amended the Subdivision Map Act to provide an additional twenty-four (24) month extension of time for all approved subdivision maps, thereby extending the recordation of the map to August 18, 2023; and WHEREAS, on June 7, 2022, the City Council approved a two-year extension of time, extending the recordation to August 18, 2025; and
Shafter City Council Resolution No. 3040
September 16, 2025
WHEREAS, Title 16, Section 4.080.B of the City Municipal Code (Subdivision Ordinance) and Government Code §66452.6(e) allow the City Council to approve extensions of time for approved, or conditionally approved, tentative subdivision maps if the request is received prior to the expiration date of the map; and
WHEREAS, the City of Shafter has historically approved subdivision map extensions of time in two-year intervals; and
WHEREAS, the Planning Commission did, on August 12, 2025, approve Resolution No. 25-468, a resolution of the Planning Commission of the City of Shafter recommending that the City Council approve a two-year extension of time for Tentative Tract Map No. 7207, subject to the conditions (Exhibit “B”) approved by the City Council on August 18, 2009, to expire on August 18, 2027; and
WHEREAS, the City Council through the City Clerk, did set Tuesday, September 16, 2025 at the hour of 6:00 p.m. in the City Council Chambers of City Hall, 336 Pacific Avenue, Shafter, California, as the time and place for a public hearing before said City Council on said proposal, and notice of the public hearing was given in the manner provided in Title Sixteen of the Shafter Municipal Code; and
WHEREAS, at said City Council meeting held on September 16, 2025, the proposed extension of time for Tentative Tract Map No. 7207 was duly presented and considered and the City Council determined that Tentative Tract Map No. 7207 is eligible to receive a two-year extension of time for recordation of the final map.
NOW, THEREFORE, BE IT that the City Council of the City of Shafter, in a regular session assembled on the 16th day of September, 2025, resolved to approve a two-year extension of time for Tentative Tract Map No. 7207 (Exhibit “A”) located between Elizabeth Avenue and West Riverside Street, subject to the conditions (Exhibit “B”) approved by the City Council on August 18, 2009, to expire on August 18, 2027.
PASSED AND ADOPTED THIS 16th DAY OF SEPTEMBER 2025.
_______________________________
Chad Givens, Mayor
ATTEST
_______________________________
Yazmina Pallares, City Clerk
APPROVED AS TO FORM:
_____________________________
Marco A. Martinez, City Attorney
Exhibit A
CONDITIONS OF APPROVAL
TENTATIVE TRACT NO. 7207
GENERAL
1. The owner( s) or project proponents ( hereinafter referred to as " Developer"), solely at their cost and expense, shall defend, indemnify and hold harmless the City of Shafter hereinafter referred to as " City"), its agents, legislative bodies, officers and employees regarding any legal or administrative action, claim or proceeding concerning approval of Tentative Tract No. 7207 and/ or related actions including, without limitation, actions taken or not taken with respect to the California Environmental Quality Act ( hereinafter referred to as " CEQA"); or, at its election and in the alternative, shall relinquish such approval. Developer shall assume the defense of the City in any such legal or administrative action, claim or proceeding with legal counsel paid for in the entirety by Developer, but subject to the City' s reasonable approvals. Developer shall also reimburse the City, its agent, legislative bodies, officers and employees for any judgments, amounts paid in settlements, court costs and attorneys' fees which the City, its agents, legislative bodies, officers and employees may be required to pay or otherwise pay as a result of such action, claim, or proceeding. The City may, at its sole discretion, participate at its own expense in the defense of any such action, claim or proceeding, but such participation shall not relieve Developer' s obligations under these conditions of approval ( hereinafter referred to as " Conditions").
2. The developer/ applicant or the developer/ applicant' s engineer, shall submit a list of all contractors and/ or subcontractors performing work on Tentative Tract 7207 to the City Administrative Services Department and such contractors and subcontrators shall obtain valid business licenses to do business and/ or work in the City of Shafter.
3. Until all portions of Tentative Tract 7207 have been developed, all vacant and undeveloped land, not being actively farmed, shall be maintained in a weed- free and clean manner by the developer/applicant/ property owner. Should said property not be so maintained, the City shall notify property owner that the property is to be cleaned within thirty ( 30) days of receipt of said notice. If property owner does not comply within the required time frame, City may then clear the land and bill the property owner for expenses incurred.
4. Unless a final map is recorded, Tentative Tract 7207 shall expire twenty- four( 24) months from the date of approval by the City Council, unless an extension is granted by the City Council. Should an extension be requested, Developer, not less than sixty ( 60) days prior to the expiration date, shall submit to the City in writing, a request for an extension of that approval in accordance with the provisions of City Code.
5. Developer shall pay all development fees and impact fees adopted by the City in effect at the time of issuance of any building permits.
6. Developer shall comply with the latest Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, National Electrical Code, Uniform Fire Code an all
EXHIBIT B
applicable codes, ordinances, regulations, and development standards in effect at the time of issuance of the relative permits.
PLANNING
7. Tentative Tract 7207 shall conform to the in- lieu park fee measures ( Quimby Act) of the City of Shatter. Said fees shall be paid prior to recordation of the Final Map.
8. In lieu of the construction of alleys, Developer shall pay refuse capacity fee as required by Ordinance No. 351. Refuse capacity fee shall be due and payable prior to recordation of the Final Map.
9. Installation of all improvements for Tentative Tract 7207 shall be completed within one year from the date of filing of the Final Map unless an extension of time is granted by the City Council.
10. Prior to recordation of Tract 7207, the developer shall enter into a development agreement with the City of Shafter, in a form and substance reasonably approved and required by the City, which shall provide for a minimum square footage of residential units within the subdivision, and which shall provide for payment of park fees, traffic fees and other fees established by the City. In the event that the City has not adopted such fees in a timely manner such that the developer would have to make payment at the time of obtaining each building permit for development of the subdivision, then the developer and the City agree that park fees shall be a minimum of$650 per lot and traffic fees shall be a minimum of$ 2, 346 per lot, and that such fees represent the actual costs pertaining to park and recreation and traffic impacts proportional to and directly related to each lot.
Such fees shall be paid regardless of whether the developer and the City enter into a development agreement. In addition, the developer shall cooperate with the City regarding the establishment and formation of a community facilities district for school purposes and the developer shall require all successors in interest in and to the subdivision, and each portion thereof, to cooperate with the City in the establishment of such a district. For this purpose, the developer and its successors in interest shall object to participate in any protest regarding the formation of such a district, and shall affrmatively vote" yes" with respect to all real property within the subdivision for purposes of establishing such a district.
11. Prior to issuance of each building permit for houses within Tentative Tract 7207, Developer shall submit a site plan to the City Planning Department for review and approval. The site plan shall reference the floor plan layout and building elevations, including exterior building materials and colors, for each of the single- family residences to be constructed within Tentative Tract 7207. All architectural features of each singlefamily residence and all landscaping requirements as set forth in Section 2. 80, Chapter 2, Title 17 of the Shafter Municipal Code ( Design Review) shall be adhered to. All roofs constructed within Tentative Tract 7207 shall be of concrete tile or Prestique I High Definition manufactured by ELK Corporation in Shaffer, its equivalent or better. 2
12. Developer shall submit landscaping and irrigation plans for review and approval by the City' s Project Assistance Team for the landscape area between the sidewalk and decorative wall along West Riverside Street, prior to the recordation of the Final Map, or first phase of the Final Map. Said landscape plans and irrigation plans shall include the following:
a. A six-foot-high solid masonry wall with split block faces, columns, or other design features to provide visual relief along the wall face, shall be subject to approval by the City' s Project Assistance Team. Said wall/ fence shall be reduced in steps from six feet in height to forty inches in height within the 25- foot frontyard setback Iine. b. Landscape irrigation plans shall include type, size, and location of the irrigation system, the location and design of all walls; and the size, type, and location of all plant materials.
13. All roof- mounted air conditioning equipment shall be located on the rear portion of the roof ridge line in such a manner as to be screened as much as practical from view from public streets.
14. With the exception of model houses, as provided in Section 3. 080, Chapter 3, Title 16 Subdivision Ordinance) of the Shafter Municipal Code, no building permit shall be issued by the City until Tract 7207 has been recorded pursuant to the requirements of Title 16 ( Subdivision Ordinance) and Title 17 ( Zoning Ordinance) of the Shafter Municipal Code.
15. The Developer ofTract 7207 shall comply with all San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) requirements while grading and developing the site. It is the developer' s responsibility to contact the SJVUAPCD to determine with which requirements/ rules the developer must comply.
16 The following notes shall appear on the final map:
a. Lots 1, 2, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, and 23, as shown on the tentative map are locate partially, or wholly, within 300 feet of land used for agricultural purposes, It is the declared policy of the City of Shafter that no agricultural activity, operation, facility, or appurtenances thereof, conducted or maintained for commercial purposes within the City of Shafter and conducted in a manner consistent with proper and accepted customs and standards as established and followed by similar agricultural operations in the same locality shall be or become a nuisance, private or public, due to any changed condition in or about the locality, after the same has been in operation for more than three ( 3) years, ifit was not a nuisance at the time it began. The term " agricultural activity, operation, facility, or appurtenances thereof' includes, but is not limited to: the cultivation and tillage of soil, dairying, the production, cultivation, growing, and harvesting of any agricultural commodity, including apiculture, horticulture, the raising of livestock, fur bearing animals, fish, or poultry; and any practices performed by a farmer or on a farm as incident to or in conjunction with such farming operations, including preparation for market, delivery to storage or to market, or to carriers for transportation to market.
3
b. Within six ( 6) months of public sewer service becoming available in West Riverside Street, the current property owner( s) of Lots 1 through 8 and Lots 16 through 23, as shown on the tentatively approved map, shall decommission, at their expense, any existing septic systems and connect to the public sewer system in compliance with all City standards.
17. Approved street names are as follows:
a. Elizabeth Avenue
b. West Riverside Street
c. Summer Breeze Court
18. Should any previously unknown or unrecorded oil well be uncovered or damaged during excavation or grading, the Bakersfield office of the California Department of Conservation/ Division of Oil, Gas, and Geothermal Resources ( DOGGR) shall be contacted for remediation information and approval.
19. The developer/ applicant shall be required to permanently maintain all landscaping except for landscaping included in the Landscape and Lighting District, including the replacement of any trees or shrubs that do not survive.
20. Approved access shall be provided for each lot in accordance with City standards.
21. The Shaftcr-Wasco Irrigation District (SWID) has indicated the following:
a. The District has a turnout 4. 1- 2M- 10 that serves the 20- acre parcel for agricultural purposes.
b. The U. S. Government has an easement along Riverside Street 45- feet north from the centerline and there is also a 15- inch AC water line located approximately 35- feet north of the centerline of Riverside Street.
c. At the time the property is to no longer be used for agriculture, the developer may submit a request to the SWID Board of Directors requesting that the turnout be removed at the landowner' s expense and that the parcel be removed from the District' s standby charges. The request for the removal from the Standby must be addressed to the Board of Directors.
d. Any development on the parcel which would affect the easement or pipeline, would require a License and Consent to enter upon, construct, operate and maintain a facility on the United States Bureau of Reclamation easements. e. Prior to commencing any work, the developer should contact Ron Sutton ( Field Superintendent) with SWID to review construction and permitting requirements over these pipelines.
22. In accordance with a request from Richland School District, a school bus pullout and stop shall be provided on West Riverside Street near the southeast corner of Lot 1, as shown on the tentative map. The bus stop shall include a concrete landing area within the landscaped area adjacent to the sidewalk to provide a standing area for the students. The bus stop shall be signed in accordance with all applicable codes and regulations. 4
BUILDING
23. Prior to issuing a certificate of occupancy for any lot, building address( es) shall he permanently installed and be clearly visible from the street.
24. No final inspection or issuance of a certificate of occupancy shall he approved for any lot, until all required improvements have been completed by the developer/ applicant and accepted by the City.
25. Private drives constructed of Portland cement- concrete shall he constructed at a minimum width of 16 feet from the edge of public roadway pavement to the garage of each house.
26. Prior to recordation ofthe Final Map, the applicant shall provide written verification that a Notice of Expungement has been recorded for the " Declaration of Substandard Property"( Document # 0205170922) recorded on July 1, 2005 by the Kern County Engineering and Survey Services Department, Code Compliance Division.
ENGINEERING: GENERAL
27. Developer shall remove and replace any existing public or private improvements that may become damaged during any phase of construction, as required by the City Engineer. The contractor working within the public right- of- way shall obtain an encroachment permit from the City Engineer prior to commencing any such work.
28. Developer shall relocate and/ or install all necessary infrastructure to provide utilities to the proposed project.
29. A six ( 6) foot public utility easement shall be provided in the front of all lots and on the street side of all corner lots as requested by the utility companies and the City Engineer.
Easements shall be granted with the final map.
30. Easements to be given to the City or any other public utility agency for, sewer, water, storm drain, electrical, or any other utility or similar purpose shall not cross private property without prior approval of the City Engineer.
31. Any above ground utility cabinets or facilities to be located within the road right- of-way or p
public utility easement shall be permitted only upon approval by the City Engineer. Such approval will be made in writing, upon written request of the applicant and/ or the affected utility company.
32, Any obstructions including utilities, irrigation lines, etc., shall be removed and/ or relocated, if necessary, at the expense ofthe applicant.
33. Any onsite wells and septic tanks shall be abandoned per Kern County standards.
34. No final inspection shall be approved until all required improvements have been completed by the applicant and accepted by the City.
5
35. All new utilities shall be underground service.
36. During construction, vehicular access points shall be covered with decomposed granite, road oil, or some other treatment acceptable to the City Engineer, to prevent generation of dust during periods of vehicular activity and/ or windy conditions and tracking of mud and dirt on public roadways.
37. Prior to issuance ofa certificate of occupancy on any lot of the proposed tract, all required improvements shall be completed and accepted by the City Council. Additional improvement outside the affected project boundary may be required for orderly development as determined by the City Engineer.
38. All improvements shall be complete within one( 1) year from the date of filing of the final map for the development, unless a time extension is granted by the City Engineer.
39. Type and location of centralized mail delivery units shall be determined by the postal service.
Ifthe postal service requires special easements for the placement of the delivery units, then said easements shall be shown on the final map.
ENGINEERING: GRADING & DRAINAGE
40. Prior to review of any required improvement plans, both a drainage/ hydrology study and a master grading plan for all tract phases shall be submitted to and approved by the City Engineer.
41. The drainage/hydrology study and hydraulic analysis for the project shall be performed by a registered civil engineer and submitted to the City Engineer for review and approval. The study shall demonstrate that any potential run-off will not impact surrounding properties.
The study shall focus on the project property and any affected adjacent properties.
42. " The grading plan for the project shall be performed by a registered civil engineer and submitted to the City Engineer for review and approval. All grading shall conform to the California Building Code, latest edition, approved by the City and City adopted standards and specifications. Storm drainage protection and disposal of water into and from the affected property shall be by method approved by the City Engineer.
43. A soils report, prepared by a registered civil engineer shall he submitted along with the grading plan. Soils report shall be performed in compliance with California Building Code, Chapter 18, latest edition. In addition, all site grading, earthwork, and building design shall be performed in accordance with the recommendations of the soils report.
44. A grading permit shall be obtained from the City prior to commencement of any grading activity.
45. Prior to issuance of a building permit, the developer shall file a " Rough Grade Certificate" with the City in accordance with the City Engineering & Design Standards. Rough Grade 6
Certificate shall be accompanied by certified soil compaction test data from an acceptable materials testing company and a certification that the rough graded in substantial conformance with the approved grading plan and Chapter 33 of the California Building Code. Developer to obtain Rough Grade Certificate form from the City.
46. Prior to final approval, acceptance of work, or issuance of certificate of occupancy, the applicant' s engineer shall file a" Final Grade Certificate" stating that all required grading has been done in accordance with the approved grading plan. Developer to obtain Final Grade Certificate form from the City.
47. The location and frequency of soils compaction testing shall be per the City Engineer. Soils compaction testing shall be provided by the developer/ owner.
48. Minimum slopes across any flat surface shall be 1%. For lots greater than or equal to one acre( 43, 560 SF) minimum slopes across any flat surface shall be 0. 5% or greater. For slopes less than 1%, surface drainage shall be channeled into a concrete v- gutter, curb and gutter, underground stone drain, or similar drainage structure.
49. All building pads shall provide a minimum of 2% slope away from each house to a earth Swale, and a minimum of 1% from the highest point in the swale to the street. The minimum pad height shall be twelve ( 12) inches above the adjacent top- of-curb.
50. Street side corner lots shall not have their side yard slope( finish grade to back of sidewalk) exceed 4 horizontal: l vertical. If maximum slope is exceeded, side yard shall be retained in an approved manner.
51. Wood retaining structures shall not be approved. Developer shall use masonry, concrete, or other approved material.
52. Drainage Basin Offsite Improvements: If developer intends to utilize the existing drainage basin located on the north side ofElizabeth Avenue for Phase I runoff, then developer shall be responsible for paying a fair share proportion of the following improvements to said drainage basin. Said improvements are also a condition of approval for Tract 6713. Both this developer and the developer of Tract 6713 to the north will be responsible for all or a portion of the following improvements to the drainage basin.
Tract Runoff Area of Total
Tract 6713 23. 18 92. 1%
Tract 7207, Phase 1 1. 98 7. 9%
Total Acres 25. 16
Developer shall contribute 7. 9% of total developer costs to upgrade the drainage basin to current standard. If Tract 6713 does not develop at the same time as Tract 7207, Phase 1, developer shall be assessed a one time fee of$ 5, 000 ( 7. 9% of an engineer' s estimate of 64, 174, see Appendix A) prior to Phase I street improvement plan approval. 7
Drainage Basin improvements shall include the following:
a. Perimeter screening: The existing chain link fence on the south side of the existing sump as well as the existing chain link fence and gates on the north side against Verde Street shall he replaced with masonry wall ( or equivalent) conforming to City standards. Wall shall be continuous with the wall required for the north side of Elizabeth Avenue. Masonry wall shall also be required between the sump and any residential lot of Tract 6713 only. Remaining chain link fencing shall be tied to the new wall in order to complete the enclosure. For all portions of the perimeter wall viewable from the street or the front yards of adjacent lots, the wall shall be decorative in nature.
b. Access Point: The existing access point located on Verde Street shall be utilized for entrance to the drainage sump. A new gate shall be constructed along with the masonry wall. Gate construction shall be decorative in nature, shall provide a secure entrance to the basin, and shall prevent visibility of the basin. Gate shall be constructed of steel Or other approved material. Wood or chain link gates shall not be acceptable. Construction, style, and finish are subject to City approval. c. Easements: Easements for access and/ or storm drains( ifrequired) shall be provided on the final map or by separate instrument as approved by the City Engineer. d. Landscaping: The south side of the existing sump shall be landscaped. See the section entitled ENGINEERING: LANDSCAPING.
53. Drainage Swales and Localized Basins ( approximate 1- Acre Lots): Developer may create drainage swales or localized drainage sumps for each of the approximate 1- acre lots within Tract 7207, Phases 2 and 3.
a. Each approximate 1- acre lot shall have its own drainage swale or localized basin and shall not be allowed to drain to any other lot' s basin. Each drainage swale or localized basin shall be sized for the lot draining to it. b. Pipes shall not be designed to connect individual swales or drainage basins to each other in order to allow flow from one area to another.
c. Drainage swales or localized basins shall be located outside the City right- of- way and any public utility easements.
d. At no time shall the drainage swales or localized basins be designed to retain more than 18 inches of water.
54. Drainage from Public Streets: Drainage from Riverside Avenue and/ or Summer Breeze Court shall be provided its own temporary public drainage basin. a. Perimeter screening: Utile temporary drainage basin exceeds 18 inches in depth, developer shall provide a six- foot chain link fence conforming to City standards.
Fence shall be equipped with a gate for maintenance purposes. b. Access Point: Access to the temporary drainage basin shall he provided from established City owned right- of-way or access easement. Paving is not required. c. Easements: Easements for access and/ or storm drains( if required) shall be provided on the final map or by separate instrument as approved by the City Engineer. 8
55. The number and location of street based siphons and cross gutters allowed, if any, will be determined during the grading and drainage review process. The minimum grade for allowed cross gutters shall be 0. 6%.
56. Grading onto adjacent property shall not be done without written permission from the adjacent property owner.
57. The Office ofthe City Engineer shall be notified 24 hours in advance ofthe placement of any fill material.
58. Fill and/ or import material shall be subject to the approval of the soils engineer.
59. Contractor is responsible for the grading of lot pad areas to within 0. 1 foot of the design elevations.
60. All areas in the site on which structures are to be placed must be compacted to 90% relative density, for a minimum distance of 5 feet in all directions from the foundations of' the structure.
61. All fill material shall be moisture conditioned to at least 2% above optimum moisture and compacted to 90% relative density, as determined by test methods referenced in California Building Code, Appendix Chapter 33, Section 3305, and so certified by tests and report from the soils engineer.
62. The design engineer shall exercise sufficient supervisory control during grading operations to insure compliance with the plans, specifications, and codes within his purview.
63. The placement of fill shall be in 6 inch maximum lifts, compacted with heavy compaction equipment approved by the City Engineer, unless specifically recommended otherwise m the preliminary soils report.
64. Compaction in proposed pavement areas should be the same as for the building pads, and should extend to a minimum distance of 2 feet beyond the outside edges of pavements.
65. All cut and fill slopes shall not be steeper than 2 horizontal to 1 vertical.
66. All fill areas to be cleared of all vegetation and other unsuitable material for a structural fill and the areas shall be scarified to a depth of 6 inches, unless specifically noted otherwise in the preliminary soils report.
67. All slopes in excess of three feet shall be prepared and maintained to control against erosion.
68. Grading work shall be supervised as engineered grading in accordance with Chapter 33 ofthe California Building Code.
69. During grading, reasonable searching should be performed for concealed subsurface obstructions. All abandoned subsurface obstructions should be removed. If the terminus of 9
any abandoned piping is outside the project limits, the piping should be removed within the project and properly capped at the project boundary.
70. Dust Control: It shall be the developer' s responsibility to prevent a dust nuisance originating from the site of work as a result of his operations during the effective period ofthis contract.
Preventative measures to he taken by the contractor shall include but not be limited to the following;
a. Water shall he applied to all unpaved areas as required to prevent the surfaces from becoming dry enough to permit dust formation.
b. Paved surfaces over which vehicular traffic is permitted to travel shall be kept free of dirt.
ENGINEERING: WATER/ FIRE
71. Developer shall install a water system for the development together with such equipment, pipeline, and facilities, including individual water services, as may be necessary to ensure the development has a minimum supply of water for the purposes of the development including fire protection. Developer shall submit water improvement plans to the City Engineer for review and approval. Developer shall construct public water systems in accordance with Subdivision Engineering Design Manual for the subject property.
72. Fire protection shall be provided per Kern County Fire Department Standards for the type of development. A Certificate of Approval shall be obtained by the applicant from the Kern County Fire Department. Evidence of this certificate of approval shall be provided to the City prior to acceptance of the water system by the City.
73. The City Engineer shall recommend hydrant type and location if required.
74. Water line size, location, and materials shall be subject to the approval ofthe City Engineer.
Minimum water line size shall be in accordance with the Subdivision Engineering Design Manual.
75. Tie- ins to existing water mains shall be constructed in a manner approved by the City Engineer.
76. Whenever possible, the water system shall be looped to minimize dead ends. For cul- de- sacs greater than 330 feet in length, the water main shall be looped through the side lot lines, of the lots near the end of the cul- de- sac, back to adjacent streets, as directed by the City Engineer. Easements shall be provided to the City in a manner consistent with the Subdivision Engineering & Design Manual.
77. Separate water services shall be installed for each residential property.
78. No permanent structures shall be constructed over proposed or existing utility easements. 10
79. Prior to the issuance of a building permit, water mains and fire hydrants to be installed by applicant shall be completed, tested, and accepted ( UFC 10. 502, 10. 503).
ENGINEERING: SEWER
80. Developer shall install a sewer system for the development together with such materials, pipeline, manholes, and individual services for the purposes of the development. Developer shall submit sewer improvement plans to the City Engineer for review and approval.
Developer shall construct public sewer systems in accordance with Subdivision Engineering Design Manual for the subject property.
81 . Sewer line size, location, slope, and materials shall be subject to the approval of the City Engineer. Minimum sewer line size, location, slope, and materials shall also be in accordance with the Subdivision Engineering Design Manual.
82. Tie- ins to existing sewer mains, manholes, or other structure shall be constructed as directed by the City Engineer.
83. Separate sewer services shall be installed for each property. At no time shall sewer be joint trenched with water.
84. Sewer lines will not be permitted in casements between the back yards or side yards of single or multi-family lots.
85. No permanent structures shall be constructed over proposed or existing utility easements.
86. ELIZABETH AVENUE: The sewer main to be constructed in Elizabeth Avenue has already been designed for Tract 6713. Developer shall ensure sewers plans submitted for construction in Elizabeth will match the already approved design submitted for Tract 6713.
Copies of plans are available on request.
87. SUMMER BREEZE COURT: Due to the lack of available sewer in Riverside Street, all approximate 1- acre lots facing Summer Breeze Court shall be served by individual septic systems. Developer shall install a dry sewer system in Summer Breeze Court with individual services for each approximate 1- acre Iot. Dry sewer shall extend to the south side of Riverside Street a minimum of ten ( 10) feet beyond the proposed street improvements and terminate with a cleanout. Each service onto the approximate 1- acre lots shall be solvent weld capped.
ENGINEERING: STREET & TRAFFIC
88. Developer shall construct and provide right of way for all streets, curb, gutter, cross gutter, drainage facilities, sidewalks, street lights, drive approaches, intersections, and other related improvements for the purposes of the development. Developer shall submit street improvement plans prepared by a registered civil engineer• to the City Engineer for review and approval and shall include:
II
a. preliminary soils report- including R values taken from proposed road locations and infiltration tests taken from any proposed basin site( s); 1) At least one( 1) R- value test will be taken for Elizabeth Avenue and two( 2) R- value tests will be taken for Summer Breeze Court.
h. preliminary engineer' s estimate of construction costs; and c. plan check and inspection fees.
89. The drawings shall include alI proposed public street pavement, curb, gutter, driveways, streetlights, cross gutter, catch basins, striping, signage, traffic signals, and sidewalks along the perimeter of all streets adjacent to or within the project site. Said improvement shall be constructed as per the street improvement plans approved by the City Engineer in a manner consistent with the Subdivision Engineering Design Manual.
90. Street Sections:
a. Pavement structural section calculations shall he performed to verify the proposed structural sections and shall be submitted to and approved by the City Engineer with street plans. Calculations shall use the results of the R- value tests from the soils report.
b. The minimum allowable structural section for Elizabeth Avenue shall be 0. 17 feet of Asphalt Concrete ( 3/ 4" AR- 4000) over 0. 42 feet of Class II Aggregate Base over 1. 0 feet native material moistened and compacted to City standards. Traffic Index 5. 0. Assumed base soil R- Value of 45.
c. The minimum allowable structural section for West Riverside Street shall be 0. 38 feet of Asphalt Concrete ( 3/ 4" PG 64- 10) over 0. 67 feet of Class II Aggregate Base over 1. 0 feet native material moistened and compacted to City standards.
Traffic Index = 8. 0. Assumed base soil R- Value of 45. d. The minimum allowable structural section for Summer Breeze Court shall be 0. 17 feet of Asphalt Concrete( 1/ 2" PG 64- 10) over 0. 33 feet of Class Il Aggregate Base over 1. 0 feet native material moistened and compacted to City standards.
Traffic Index — 4. 0
e. Minimum cross slope shall be 1. 5% constructed. A minimum of 2% cross slope shall be designed and shown on plans.
91. Street Dimensions:
a. Elizabeth Avenue shall be developed as a modified local along the entire property line ofthe subject property, in accordance with standards and specifications ofthe City as approved by the City Engineer. Developer shall be responsible for developing that portion south of the centerline as follows:
1) Elizabeth Avenue shall be fifteen ( 15) feet partial right- of- way with eight 8) feet from centerline to flowline. Total flowline to flowline dimension shall be 40 feet.
2) The design of Elizabeth Avenue shall include the already approved grades and dimensions for Elizabeth Avenue per the approved grading, and street plans for Tract 6713. Copies will he made available on request. 3) If Tract 6713 is not developed prior to Phase I of"Tract 7207, then developer shall be responsible for constructing Elizabeth Avenue to 12
twenty- six ( 26) feet north of the centerline of Elizabeth Avenue. This is necessary to obtain twenty-four( 24) feet of paving plus ten ( 10) feet for parking. Developer shall also construct a temporary turnaround at the west end of Elizabeth Avenue. Developer shall secure right-of-way from the property owner to the north for both the permanent street and the temporary turnaround.
b. Riverside Street shall be developed as an arterial, half-width, along the entire property line of the subject property, in accordance with standards and specifications of the City as approved by the City Engineer. Riverside Street shall be fifty-five ( 55) feet half right-of-way with forty-one (41) feet centerline to fiowhne.
1) Riverside Street shall be fifty-five ( 55) feet half right-of- way with fortyone ( 41) feet centerline to flowline. 2) Portions of the existing road shall be demolished and Riverside Street shall be constructed to its centerline. Demolition and construction beyond the centerline of Riverside Street may be necessary if existing road profile will not accommodate new construction.
3) Provisions shall be made for both the design and construction of Riverside Street for a future fourteen ( 14) foot wide landscaped median centered on Riverside Street.
c. Summer Breeze Court shall be developed as a full- width local street in accordance with the standards and specifications of the City as approved by the City Engineer.
Summer Breeze Court shall be fifty- two ( 52) feet full- width right- of-way with forty( 40) feet flowline to flowline.
92. Should a street transition to another street with a ninety( 90) degree turn occur, that transition shall be a street knuckle and shall be shown on the final tract map and in the street improvement plans.
93. Cul- de- sac and street knuckle dimensions and radii to conform to the Subdivision Engineering Design Manual and/ or the City Engineer. The use of offset cul- de- sacs is approved provided they meet the requirements of the City.
94. The following streets shall be striped in accordance with the City Engineer and Caltrans Traffic Manual, latest edition. Proposed striping shall be shown on street plans. a. West Riverside Street
95. Street signs shall be installed per City standards as required by the City Engineer.
96. All utilities proposed under paving shall be installed prior to paving. Cover over utilities shall be a depth as approved by the City Engineer.
97. During construction, the applicant shall maintain the project, including adjacent streets in a dust free condition. This condition applies at all times including weekends, evenings and nighttime hours. During construction operations, cleanup of soil from the public roadways shall be required, if deemed necessary, by the City Engineer. 13
98. Driveway approaches shall be constructed in a manner consistent with the requirements for residential approaches as set forth in the City' s Subdivision and Engineering Design Manual.
The tops of adjacent drive approaches shall be a minimum of ten ( 10) feet apart.
99. Sidewalk, including curb, shall be five( 5) feet wide and shall be placed behind the curb on all streets. Transitions at intersections and wheelchair ramps shall be provided and installed per City' s Subdivision and Engineering Design Manual.
100. Monument and monument covers shall be set per City Standards. 101. Temporary turnarounds, ifrequired, including right of way, shall be granted, designed, and installed per the Subdivision and Engineering Design Manual. 102. Property line locations shall be marked with a chiseled line on the top of curb for all property lines. The location of all sewer laterals shall be indicated on the top of curb with a stamped 5".
103. Street lighting shall be installed in accordance with the City Engineering & Subdivision Design Manual as directed by the City Engineer. Developer shall coordinate with Pacific Gas & Electric to ensure that the street lights are established under the LS- 2 rate schedule. 104. Secondary access easements shall be provided at the request of the City Engineer. Within any given phase of development, secondary access easements and improvements shall be provided in a manner approved by the City Engineer. Access roads shall be twelve( 12) feet in width and shall consist of three( 3) inches of class 11 aggregate base over six ( 6) inches of native material compacted to 90% relative maximum density. 105. A waiver of direct access shall be dedicated and shown on the final map as follows:
a. Along the south property lines of Lots 1 and 23, as shown on the tentative map. 106. Blue Botts' dots shall be placed at the center of the street for each fire hydrant. 107. A City benchmark shall be established in the top of curb at either the BCR or the ECR on the northwest corner of Summer Breeze Court and West Riverside Street. Location shall be established with an " X" chiseled or stamped in the top of curb. Developer shall have a California State Licensed Surveyor establish the benchmark elevation and submit calculations to the City for review and approval
ENGINEERING: LANDSCAPING
108. All landscaping plans including plants, irrigation equipment, points of connection to water lines, timers, lighting, etc. shall be approved by the City Engineer prior to construction.
Landscaping plumbing, electrical, plants, and trees shall be designed for all phases of the tract.
14
109. Electrical Source for Landscaping:
a. For landscaping systems that do not require pumps, motorized equipment, or other large power loads, Developer shall make provisions for landscaping timers and solenoids to receive power from the street lighting system. b. Developer shall ensure the electrical loads for the landscaping system meet the requirements of Pacific Gas & Electric LS- 2 flat rate. c. Conduits shall be run directly from a street lighting splice box to the secured landscaping cabinet.
d. Service wiring size shall match the size of the wiring for street lighting. e. Service wiring shall be adequately protected from overload with in- line fuse or equivalent, serviceable from the landscaping enclosure. 110. Water Source for Landscaping:
a. Landscaping water service point of connection shall be approved by the City Engineer and shown on the water plans.
b. Water source shall be a minimum 2 inch water service conforming to City standards c. Meters, meter boxes, and a backflow prevention device shall be provided. 1 1 1. Landscaping Enclosure:
a. Landscaping Timers, electrical service fuses, breakers, etc., shall be installed within a commercial grade landscaping enclosure.
b. Commercial grade landscaping enclosure shall be installed within the dedicated landscaping area adjacent to the water source and/ or electrical source. c. Commercial grade landscaping enclosure shall be installed on a concrete foundation poured onto a minimum of 6 inches of native subgrade compacted to 90% ( or in accordance with manufacturer' s recommendations, whichever is more stringent). d. City of Shafter Subdivision Engineering& Design Manual requires a 110 volt duplex electrical service within the enclosure. This requirement is waived since it will not allow direct connection to the street lighting system per the LS- 2 rate. 112. All other landscaping requirements shall meet the requirements of the City of Shafter Subdivision Engineering & Design Manual.
113. Masonry Wall:
a. A masonry wall, or approved alternative, is to be installed:
1) Along the north right- of- way line of West Riverside Street 2) At the perimeter of any proposed permanent drainage basin. b. Wall plans, materials, dimensions to be approved by City prior to construction. 1 14. Sleeves shall be placed under the proposed paving for landscaping piping or low voltage electrical per the City Engineer.
115. Developer shall place the entire subdivision within a new or pre-existing Landscape/ Lighting Maintenance District, prior to acceptance of improvements by the City. 15
a. The maintenance district shall be set- up to cover the cost of street lighting, drainage basin maintenance, and landscaping maintenance, as well as all administrative costs associated with the City' s management of the district. b. The Developer shall be required to cover the cost of street lighting, maintain all landscaping, including the replacement of any trees or shrubs that do not survive, within public right-of-way and landscape easements for a period of six ( 6) months after final inspection of the Iandscape improvements, or until such time as the maintenance district is formed, whichever shall occur last. c. Developer shall be fully responsible for the formation, and formation cost of the Landscape/ Lighting Maintenance District, as directed by the City Engineer. d. Developer shall be fully responsible for paying the cost of water for all landscaping and electricity for the street lights until such time as the maintenance district is formed.
ENGINEERING: OTHER
1 16. Fiber Optic
a. Developer shall design and install a system of conduits, terminal boxes, splice boxes, connection points, etc. for fiber optic network for each buildable lot within the development. Plans shall be submitted showing the proposed utility trench and all appurtenant hardware.
b. Fiber optic conduits can be joint trenched with other utility company pipes and/ or conduits. Conduits fbr fiber Optic system shall be mandrelled, checked for obstructions, and equipped with mule tape going from stub to stub. The fiber optic cable shall be pulled by others when system is available. c. Design and material specifications are available from the City of Shafter. 16
APPENDIX A
ENGINEER' ER' SS ESTIMATE-- BASIN IMPROVEMENTS
ITEM DESCRIPTION QTY UNITS UNIT COST TOTAL EST
Al MASONRY WALL, NORTH SIDE 175 L1= 76. 00 13, 300
MASONRY WALL, SOUTH SIDE, 265 LE 76. 00 20, 140
VENEER COLUMNS; 40 ET- i- I- SPACING 14 EA $ 1, 200. 00 16, 800 A2 16' GATE 1 LS $ 1, 600. 00 1, 600
A3 DEMOLITION OF EXISTING CHAIN LINK FENCE 1 LS $ 3, 500. 00 3, 500 A4 ENGINIERING1 LS $ 3, 500. 00 3, 000
SUBTOTAL OFFSITE BASIN IMPROVE+ME.NTS 58, 340
10% CONTINGENCY: 5, 834
TOTAL,: 64, 174
7' R 6713 23. 18 ACRES 92. 1% $ 59, 124
TR 7207 PHASE 1 1. 98 ACRES 7. 9% $ 5, 050
25. 16 ACRES TOTAL 64, 174
17
PUBLIC HEARINGS
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Clarisa Olaguez, Associate Planner
SUBJECT: TENTATIVE TRACT MAP NO. 6398 EXTENSION OF TIME
APPROVAL
RECOMMENDATION
Council find the action does not require additional CEQA review; conduct a public hearing; and adopt Resolution No. 3041, a Resolution of the City Council of the City of Shafter, approving a two (2) year extension of time for Tentative Tract Map No. 6398 located at the southwest corner of East Tulare Avenue and North Beech Avenue, within the City of Shafter, subject to the conditions approved by the City Council on July 18, 2006, to now expire on October 1, 2027.
BACKGROUND
The City Council approved Tentative Tract No. 6398 on July 18, 2006, by Resolution No. 06-1845. The tract map is located at the southwest corner of E. Tulare Avenue and N. Beech Avenue and proposes to subdivide 1.54 acres into five (5) single-family residential lots ranging in size from 12,342 square feet to 16,427 square feet. The subject property is zoned for Low Density Residential (R-1) development.
The original expiration date for the tentative map was July 18, 2008. However, due to the slow economy in the mid-2000s, the California State Legislature enacted multiple statutory extensions, which collectively added eleven years to the life of previously approved subdivision maps. In addition to the legislative extensions, the City Council approved two discretionary time extensions, and a Development Agreement. The most recent Council approval was on September 1, 2020, approving Development Agreement No. 20-18 for Tentative Tract No. 6398. This extended the expiration date to October 1, 2025.
Therefore, the applicant is requesting approval of the final two-year discretionary time extension, which would move the map expiration date to October 1, 2027. Should the map not be recorded by that date, no further discretionary extensions would be available, and the map would expire.
The Planning Commission considered the proposed extension of time on August 12, 2025, and recommended that the City Council approve the requested two-year extension of time to file a final map for Tentative Tract Map 6398, subject to the conditions approved by the City Council on July 18, 2006.
TENTATIVE TRACT MAP NO. 6398 EXTENSION OF TIME APPROVAL - 2 -
FISCAL IMPACT
There is no fiscal impact directly resulting from the approval of this tentative tract map extension.
CEQA ANALYSIS
The City of Shafter adopted a Negative Declaration for Tentative Tract Map No. 6398 on July 18, 2006 (Resolution No. 06-1845); therefore, no additional California Environmental Quality Act analysis or documentation is required for the extension of time.
APPROVED BY THE CITY ATTORNEY
No
ATTACHMENTS
1. Vicinity Map
2. Resolution No. 3041
3. Exhibit "A" of Resolution No. 3041
BLAKE AVE
MAPLE ST
PLUMTREE CT
PINE ST
E TULARE AVE
HAZELWOOD PL
BEECH AVE
Exhibit 1: Tentative Tract Map No. 6398 Vicinity Map
Copyright nearmap 2015
Override 1 Road Centerlines
Arterial
Collector
Local
7/23/2025, 7:57:38 AM
0 0.01 0.03 0.06 mi
0 0.03 0.05 0.1 km
1:2,257
City of Shafter
City of Shafter | Source: U.S. Census Bureau | County of Kern Planning Department, Bakersfield, California. | Kern County Assessor's Office, Mapping Section. 6398
EXHIBIT 2
RESOLUTION NO. 3041
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHAFTER APPROVING A TWO (2) YEAR EXTENSION OF TIME FOR TENTATIVE TRACT MAP NO. 6398 LOCATED AT THE SOUTHWEST CORNER OF E. TULARE AVENUE AND N. BEECH AVENUE, WITHIN THE CITY OF SHAFTER
WHEREAS, on July 22, 2025, Dominga Arenas, the property owner, requested approval of an extension of time to record a final map on that certain property in the City of Shafter as shown on attached Exhibit “A”, citing a desire to keep the map active while they complete the preparation of a final map as the justification for extending the map. The extension of time request was submitted prior to the expiration of the map and is being considered within the 60-day time period allowed by the Subdivision Map Act; and
WHEREAS, Tentative Tract Map 6398, proposing to subdivide 1.54 acres into 5 singlefamily residential lots ranging in size from 12,342 square feet to 16,427 square feet, was approved by the City Council on July 18, 2006; and
WHEREAS, the City of Shafter adopted a Negative Declaration for Tentative Tract No. 6398 on July 18, 2006 (Resolution No. 06-1845), therefore no additional CEQA analysis or documentation is required for the extension of time; and WHEREAS, Tentative Tract Map No. 6398 was approved with a condition requiring the final map to be recorded within two years; and
WHEREAS, on July 15, 2008, the state legislature amended the Subdivision Map Act to provide an additional twelve (12) month extension of time for all approved subdivision maps, thereby extending the recordation of the map to July 18, 2009; and WHEREAS, on July 15, 2009, the state legislature amended the Subdivision Map Act to provide an additional twenty-four (24) month extension of time for all approved subdivision maps, thereby extending the recordation of the map to July 18, 2011; and WHEREAS, on July 15, 2011, the state legislature amended the Subdivision Map Act to provide an additional twenty-four (24) month extension of time for all approved subdivision maps, thereby extending the recordation of the map to July 18, 2013; and WHEREAS, on August 16, 2011, the City Council approved a two-year extension of time, thereby extending the recordation of the map to July 18, 2015; and WHEREAS, on July 11, 2013, the state legislature amended the Subdivision Map Act to provide an additional twenty-four (24) month extension of time for all approved subdivision maps, thereby extending the recordation of the map to July 18, 2017; and WHEREAS, on October 10, 2015, the state legislature amended the Subdivision Map Act to provide an additional twenty-four (24) month extension of time for all approved subdivision maps, thereby extending the recordation of the map to July 18, 2019; and
Shafter City Council Resolution No. 3041
September 16, 2025
WHEREAS, on July 11, 2019, the City Council approved a two-year extension of time, thereby extending the recordation of the map to July 18, 2021; and WHEREAS, on September 1, 2020, the City Council approved Development Agreement No. 20-18 for Tentative Tract No. 6398, thereby extending the recordation of the map to October 1, 2025; and
WHEREAS, Title 16, Section 4.080.B of the City Municipal Code (Subdivision Ordinance) and Government Code §66452.6(e) allow the City Council to approve extensions of time for approved, or conditionally approved, tentative subdivision maps if the request is received prior to the expiration date of the map; and
WHEREAS, the City of Shafter has historically approved subdivision map extensions of time in two-year intervals; and
WHEREAS, the Planning Commission did, on August 12, 2025, approve Resolution No. 25-469, a resolution of the Planning Commission of the City of Shafter recommending that the City Council approve a two-year extension of time for Tentative Tract Map No. 6398, subject to the conditions approved by the City Council on July 18, 2006, to expire on October 1, 2027; and WHEREAS, the City Council through the City Clerk, did set Tuesday, September 16, 2025 at the hour of 6:00 p.m. in the City Council Chambers of City Hall, 336 Pacific Avenue, Shafter, California, as the time and place for a public hearing before said City Council on said proposal, and notice of the public hearing was given in the manner provided in Title Sixteen of the Shafter Municipal Code; and
WHEREAS, at said City Council meeting held on September 16, 2025, the proposed extension of time for Tentative Tract Map No. 6398 was duly presented and considered and the City Council determined that Tentative Tract Map No. 6398 is eligible to receive a two-year extension of time for recordation of the final map.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Shafter, in a regular session assembled on the 16th day of September, 2025, resolved to approve a two-year extension of time for Tentative Tract Map No. 6398 (Exhibit “A”) located on the southwest corner of East Tulare Avenue and North Beech Avenue, subject to the conditions (Exhibit “B”) approved by the City Council on July 18, 2006, to expire on October 1, 2027.
PASSED AND ADOPTED THIS 16th DAY OF SEPTEMBER 2025.
_______________________________
Chad Givens, Mayor
ATTEST
_______________________________
Yazmina Pallares, City Clerk
Shafter City Council Resolution No. 3041
September 16, 2025
APPROVED AS TO FORM:
_____________________________
Marco A. Martinez, City Attorney
MANAGEMENT REPORT
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Alex Gonzalez, Deputy Public Works Director SUBJECT: 2025 RESIDENTIAL STREET IMPROVEMENT PROJECT AWARD (ST00021.25)
RECOMMENDATION
Council find the action is exempt from the California Environmental Quality Act; accept bids received for the 2025 Residential Street Improvement Project; and authorize the Deputy Public Works Director to issue a Notice of Award and Notice to Proceed to Westrock LLC dba Westrock General Engineering in an amount not to exceed $1,100,000 for the project.
BACKGROUND
On July 15, 2025, the City Council authorized Staff to advertise the 2025 Residential Street Improvement Project (ST00021.25) for public bids. The project includes work along South Reiker Street and West Marengo Avenue, such as pavement repairs, concrete replacement, new sidewalks, ADA ramps, and other related improvements.
Bids were opened on August 29, 2025. The City received seven bids; however, one was deemed non-responsive because the contractor submitted it on the incorrect bid form. The other six bids were reviewed for accuracy and completeness and are the first listed in the summary below.
Bidder Total Base Bid
WESTROCK LLC DBA WESTROCK
GENERAL ENGINEERING
$944,444.00
BOWMAN ASPHALT INC $962,374.40
BURTCH TRUCKING INC DBA
BURTCH CONSTRUCTION
$1,029,006.50
NAGLE EARTHWORKS $1,047,686.00
MAC GENERAL ENGINEERING
INC
$1,068,426.75
S&B SONS INC $1,585,413.99
2025 RESIDENTIAL STREET IMPROVEMENT PROJECT AWARD (ST00021.25) - 2 -
DERRICK D ENTERPRISE INC NON-RESPONSIVE
A detailed bid breakdown by project line item is provided in Attachment 1.
Westrock LLC dba Westrock General Engineering submitted the lowest responsive bid valued at $944,444.00. They have completed similar projects for the City, including the 2024 Residential Street Improvement Project, so they meet the qualifications to complete the current project.
FISCAL IMPACT
The project combines two funded Capital Improvement Program (CIP) projects:
• ST00021.25 - 2025 Residential Road Reconstruction Project, with an allocation of $500,000
• ST00039.2 - 2025 RMRA Road Improvement Project, with an allocation of $600,000
The cost proposal from Westrock LLC dba Westrock General Engineering for the residential street improvements is $944,444.00. To allow for construction contingencies, inspection, testing, and administrative costs, staff recommends establishing a total construction budget of $1,100,000. A budget amendment will not be necessary at this time.
CEQA ANALYSIS
The project is categorically exempt from the California Environmental Quality Act (CEQA) per Section 15301 of the CEQA Guidelines because the project is the repair, maintenance, and/or minor alteration of existing public right-of-way involving no expansion of existing or former use.
APPROVED BY THE CITY ATTORNEY
Not Applicable
ATTACHMENTS
1. BID RESULTS - 2025 Residential Street Improvement Project [ST00021.25]
A.
ITEM DESCRIPTION QTY UNITS Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost Unit Cost Total Cost A1 HOT MIX ASPHALT, 1/2 IN PG64‐10 796 TONS 120.00 $ 95,520.00 $ 120.00 $ 95,520.00 $ 122.50 $ 97,510.00 $ 155.26 $ 123,586.96 $ 133.75 $ 106,465.00 $ 202.28 $ 161,014.88 $ A2 FULL DEPTH GRIND & REMOVE SECTION, REIKER (.30' DEPTH) 51,342 SF 0.80 $ 41,073.60 $ 0.50 $ 25,671.00 $ 0.50 $ 25,671.00 $ 0.35 $ 17,969.70 $ 0.40 $ 20,536.80 $ 1.31 $ 67,258.02 $ A3 SUBGRADE PREP (INCLUDES DIRT WORK, HAUL ON/OFF) 51,342 SF 0.15 $ 7,701.30 $ 0.85 $ 43,640.70 $ 0.47 $ 24,130.74 $ 0.76 $ 39,019.92 $ 0.30 $ 15,402.60 $ 1.46 $ 74,959.32 $ A4 CLASS II AGGREGATE BASE 628 CY 94.00 $ 59,032.00 $ 65.00 $ 40,820.00 $ 62.18 $ 39,049.04 $ 122.18 $ 76,729.04 $ 71.00 $ 44,588.00 $ 80.00 $ 50,240.00 $ A5 FOG SEAL 51,342 SF 0.17 $ 8,728.14 $ 0.05 $ 2,567.10 $ $ 0.03 $ 0.07 1,386.23 $ 3,593.94 $ 0.07 $ 3,593.94 $ 0.07 $ 3,593.94 $ A6 DEMO EXISTING CONCRETE (SIDEWALK/DRIVE APPROACHES/RAMPS) 8,715 SF 3.75 $ 32,681.25 $ 3.00 $ 26,145.00 $ 4.40 $ 38,346.00 $ 3.09 $ 26,929.35 $ 5.25 $ 45,753.75 $ 1.10 $ 9,586.50 $ A7 SIDEWALK 8,082 SF 8.25 $ 66,676.50 $ 7.00 $ 56,574.00 $ 9.67 $ 78,152.94 $ 7.99 $ 64,575.18 $ 8.85 $ 71,525.70 $ 25.20 $ 203,666.40 $ A8 RESIDENTIAL DRIVE APPROACH 319 SF 11.00 $ 3,509.00 $ 11.50 $ 3,668.50 $ 17.73 $ 5,655.87 $ 15.78 $ 5,033.82 $ 18.20 $ 5,805.80 $ 32.40 $ 10,335.60 $ A9 COMMERCIAL DRIVE APPROACH 1,207 SF 14.50 $ 17,501.50 $ 19.00 $ 22,933.00 $ 14.86 $ 17,936.02 $ 15.32 $ 18,491.24 $ 18.10 $ 21,846.70 $ 38.40 $ 46,348.80 $ A10 TYPE‐C ADA RAMP 14 EA 2,250.00 $ 31,500.00 $ 3,500.00 $ 49,000.00 $ 6,020.00 $ 84,280.00 $ 2,590.69 $ 36,269.66 $ 3,080.30 $ 43,124.20 $ 8,578.29 $ 120,096.06 $ A11 RETAINING CURB @ BACK OF SIDEWALK 33 LF 50.00 $ 1,650.00 $ 150.00 $ 4,950.00 $ 163.00 $ 5,379.00 $ 66.79 $ 2,204.07 $ 56.40 $ 1,861.20 $ 46.55 $ 1,536.15 $ A12 DEMO & REPLACE 6" CURB & GUTTER 1,135 LF 51.50 $ 58,452.50 $ 62.00 $ 70,370.00 $ 52.10 $ 59,133.50 $ 42.83 $ 48,612.05 $ 80.70 $ 91,594.50 $ 50.40 $ 57,204.00 $ A13 DEMO & REPLACE 8" CURB & GUTTER 861 LF 60.00 $ 51,660.00 $ 66.00 $ 56,826.00 $ 56.46 $ 48,612.06 $ 55.66 $ 47,923.26 $ 85.30 $ 73,443.30 $ 80.40 $ 69,224.40 $ A14 DEMO & REPLACE CROSS GUTTER 5 EA 4,210.00 $ 21,050.00 $ 7,500.00 $ 37,500.00 $ 6,095.00 $ 30,475.00 $ 6,726.88 $ 33,634.40 $ 8,122.00 $ 40,610.00 $ 5,520.00 $ 27,600.00 $ A15 DEMO & REPLACE SPANDREL (INCLUDES CURB) 10 EA 5,400.00 $ 54,000.00 $ 6,600.00 $ 66,000.00 $ 5,883.00 $ 58,830.00 $ 8,015.66 $ 80,156.60 $ 8,341.55 $ 83,415.50 $ 8,184.00 $ 81,840.00 $ A16 ADJUST FACILITIES TO GRADE (SMALL) 13 EA 1,320.00 $ 17,160.00 $ 1,350.00 $ 17,550.00 $ 1,458.00 $ 18,954.00 $ 1,527.94 $ 19,863.22 $ 1,342.20 $ 17,448.60 $ 553.85 $ 7,200.05 $ A17 ADJUST FACILITIES TO GRADE (LARGE) 6 EA 1,320.00 $ 7,920.00 $ 2,150.00 $ 12,900.00 $ 2,842.00 $ 17,052.00 $ 5,104.74 $ 30,628.44 $ 1,623.60 $ 9,741.60 $ 1,600.00 $ 9,600.00 $ A18 INSTALL NEW STREET MONUMENT 3 EA 1,320.00 $ 3,960.00 $ 1,350.00 $ 4,050.00 $ 1,555.00 $ 4,665.00 $ 5,530.08 $ 16,590.24 $ 1,342.20 $ 4,026.60 $ 720.00 $ 2,160.00 $ A19 TRAFFIC STRIPING 1 LS 3,850.00 $ 3,850.00 $ 8,100.00 $ 8,100.00 $ 9,000.00 $ 9,000.00 $ 10,608.97 $ 10,608.97 $ 4,972.30 $ 4,972.30 $ 18,000.00 $ 18,000.00 $ A20 CONSTRUCTION STAKING (FULL PROJECT) 1 LS 21,950.00 $ 21,950.00 $ 25,000.00 $ 25,000.00 $ 18,000.00 $ 18,000.00 $ 28,749.00 $ 28,749.00 $ 25,000.00 $ 25,000.00 $ 26,400.00 $ 26,400.00 $ A21 TRAFFIC CONTROL (FULL PROJECT) 1 LS 52,686.00 $ 52,686.00 $ 30,000.00 $ 30,000.00 $ 40,000.00 $ 40,000.00 $ 16,735.00 $ 16,735.00 $ 53,354.05 $ 53,354.05 $ 36,000.00 $ 36,000.00 $ A22 MOBILIZATION (FULL PROJECT) 1 LS 74,000.00 $ 74,000.00 $ 29,000.00 $ 29,000.00 $ 35,000.00 $ 35,000.00 $ 20,811.92 $ 20,811.92 $ 18,618.55 $ 18,618.55 $ 9,600.00 $ 9,600.00 $ Subtotal 732,261.79 $ Subtotal 728,785.30 $ Subtotal $ 757,218.40 Subtotal 768,715.98 $ Subtotal 802,728.69 $ Subtotal 1,093,464.12 $ B.
B1 HOT MIX ASPHALT, 1/2" TYPE A, PG64‐10 344 TONS 120.00 $ 41,280.00 $ 120.00 $ 41,280.00 $ 138.48 $ 47,637.12 $ 156.40 $ 53,801.60 $ 133.75 $ 46,010.00 $ 220.88 $ 75,982.72 $ B2 FULL DEPTH GRIND & REMOVE SECTION MARENGO (0.65' DEPTH) 22,208 SF 0.80 $ 17,766.40 $ 0.80 $ 17,766.40 $ 1.09 $ 24,206.72 $ 0.55 $ 12,214.40 $ 1.00 $ 22,208.00 $ 2.32 $ 51,522.56 $ B3 SUBGRADE PREP (INCLUDES DIRT WORK, HAUL ON/OFF) 22,208 SF 0.15 $ 3,331.20 $ 0.85 $ 18,876.80 $ 0.54 $ 11,992.32 $ 1.33 $ 29,536.64 $ 0.30 $ 6,662.40 $ 3.01 $ 66,846.08 $ B4 CLASS II AGGREGATE BASE 271 CY 94.00 $ 25,474.00 $ 65.00 $ 17,615.00 $ 93.04 $ 25,213.84 $ 113.47 $ 30,750.37 $ 71.00 $ 19,241.00 $ 80.29 $ 21,758.59 $ B5 FOG SEAL 22,208 SF 0.17 $ 3,775.36 $ 0.05 $ 1,110.40 $ 0.05 $ 1,110.40 $ 0.21 $ 4,663.68 $ 0.07 $ 1,554.56 $ 0.11 $ 2,442.88 $ B6 DEMO EXISTING CONCRETE (SIDEWALK/DRIVE APPROACHES/RAMPS) 1794 SF 3.75 $ 6,727.50 $ 3.00 $ 5,382.00 $ 4.40 $ 7,893.60 $ 5.95 $ 10,674.30 $ 6.50 $ 11,661.00 $ 2.68 $ 4,807.92 $ B7 SIDEWALK 3437 SF 8.25 $ 28,355.25 $ 7.00 $ 24,059.00 $ 9.67 $ 33,235.79 $ 7.99 $ 27,461.63 $ 9.50 $ 32,651.50 $ 25.20 $ 86,612.40 $ B8 RESIDENTIAL DRIVE APPROACH 2057 SF 11.00 $ 22,627.00 $ 11.50 $ 23,655.50 $ 17.73 $ 36,470.61 $ 15.32 $ 31,513.24 $ 16.00 $ 32,912.00 $ 32.56 $ 66,975.92 $ B9 TYPE‐C ADA RAMP 4 EA 2,250.00 $ 9,000.00 $ 3,500.00 $ 14,000.00 $ 6,020.00 $ 24,080.00 $ 2,362.79 $ 9,451.16 $ 2,776.05 $ 11,104.20 $ 12,000.00 $ 48,000.00 $ B10 DEMO & REPLACE 6" CURB & GUTTER 437 LF 51.50 $ 22,505.50 $ 62.00 $ 27,094.00 $ 52.10 $ 22,767.70 $ 59.59 $ 26,040.83 $ 90.40 $ 39,504.80 $ 50.40 $ 22,024.80 $ B11 DEMO & REPLACE CROSS GUTTER 2 EA 4,210.00 $ 8,420.00 $ 7,500.00 $ 15,000.00 $ 6,095.00 $ 12,190.00 $ 7,423.66 $ 14,847.32 $ 9,902.90 $ 19,805.80 $ 5,520.00 $ 11,040.00 $ B12 DEMO & REPLACE SPANDREL (INCLUDES CURB) 4 EA 5,400.00 $ 21,600.00 $ 6,600.00 $ 26,400.00 $ 5,883.00 $ 23,532.00 $ 5,046.47 $ 20,185.88 $ 5,260.15 $ 21,040.60 $ 8,184.00 $ 32,736.00 $ B13 ADJUST FACILITIES TO GRADE (SMALL) 1 EA 1,320.00 $ 1,320.00 $ 1,350.00 $ 1,350.00 $ 1,458.00 $ 1,458.00 $ 7,828.97 $ 7,828.97 $ 1,342.20 $ 1,342.20 $ 1,200.00 $ 1,200.00 $ Subtotal 212,182.21 $ Subtotal 233,589.10 $ Subtotal 271,788.10 $ Subtotal 278,970.02 $ Subtotal 265,698.06 $ Subtotal 491,949.87 $ Total Bid Price 944,444.00 $ Total Bid Price 962,374.40 $ Total Bid Price $ 1,029,006.50 Total Bid Price 1,047,686.00 $ Total Bid Price 1,068,426.75 $ Total Bid Price 1,585,413.99 $ Value differs from submitted bid form and was calculated using the unit prices. Name Item Name Item Name Item Name Item Name Item Name Item Value provided on bid form to 3 decimal places, values shown are rounded to the nearest cent.
Cen‐Cal Construction F/P/S Minor Concrete Pavement Recycling Systems Full Depth Grind (Portion) Central California Construction
Demo, Concrete, Adjsut Utilities Harker Striping & Signage Traffic Striping Cen Cal Construction Concrete Demo & Pour Back Asphalt Dr. Asphalt Chrisp Company Traffic Striping Harker Striping & Signage Striping Harker Striping & Signage Striping Cen‐Cal Construction Items A7‐A15, B7‐B12 Chrsip Company Striping H&H Surveying Surveying Cindy Trump Inc Operated Grinder Rental H&H Surveying Surveying, Staking H&H Surveying Surveying ***ALL BIDS ARE UNDER REVIEW Pavement Recycling Asphalt Grinding BOWMAN ASPHALT BURTCH CONSTRUCTION NAGLE EARTHWORKS MAC GENERAL ENGINEERING INC. S&B SONS, INC.
WEST MARENGO AVENUE IMPROVEMENTS
WESTROCK GENERAL ENGINEERING
ST00021.25 ‐ 2025 RESIDENTIAL STREET IMPROVEMENT PROJECT SOUTH REIKER STREET IMPROVEMENTS
MANAGEMENT REPORT
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Lance Lippincott, City Manager, Vanessa Uribe, Executive Assistant SUBJECT: AUTHORIZATION TO UTILIZE DESIGN-BUILD PROCUREMENT
METHOD AND APPROVING THE RELEASE OF A REQUEST FOR
QUALIFICATIONS AND PROPOSALS (RFQP) FOR DESIGNBUILD SERVICES TO CONVERT THE FORMER MODIFIED
COMMUNITY CORRECTIONAL FACILITY (MCCF) INTO A
POLICE DEPARTMENT HEADQUARTERS
RECOMMENDATION
Council find that the action is not defined as a "project" under Section 15378(b)(5) of the CEQA Guidelines; authorize the use of the Design-Build Procurement Method pursuant to Chapter 2.69 of Title 2 of the Shafter Municipal Code; approve the release of a Request for Qualifications and Proposals (RFQP) for design-build services to convert the former Modified Community Correction Facility (MCCF) into a Police Department headquarters; and direct the City Engineer or designee to prepare procurement documents, including prequalification and selection criteria, with Council retaining final authority to award the design-build contract following staff evaluation and recommendation.
BACKGROUND
The Shafter Police Department is currently operating from 201 Central Valley Highway, which has become inadequate due to spatial constraints, aging infrastructure, and increasing demands for public safety services. In an effort to improve operational efficiency and public safety service delivery, Staff has identified the vacated Modified Community Correctional Facility (MCCF), located at 1150 E. Ash Avenue, as a viable site to repurpose into a modern police headquarters.
The proposed conversion would include:
• Renovation of former detention areas into administrative and operational offices; • Construction of evidence storage and forensic processing areas; • Installation of secure access systems and upgraded communications infrastructure; and
• Site and structural modifications to meet public access and ADA requirements.
AUTHORIZATION TO UTILIZE DESIGN-BUILD PROCUREMENT METHOD AND APPROVING THE RELEASE OF A REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQP) FOR DESIGNBUILD SERVICES TO CONVERT THE FORMER MODIFIED COMMUNITY CORRECTIONAL
FACILITY (MCCF) INTO A POLICE DEPARTMENT HEADQUARTERS
- 2 -
Chapter 2.69 of Title 2 of the Shafter Municipal Code authorizes the City, subject to approval by the City Council, to use the design-build procurement method as an alternative to the traditional design-bid-build process. This approach integrates design and construction services under one contract. Staff recommends the design-build method to reduce the City's overall risk through a single point of responsibility and, due to the project's specialized and technical nature with limited qualified providers.
Following Staff review, a summary of results and a recommendation for contract award will be presented to the City Council for final approval.
FISCAL IMPACT
Approval of this item does not commit the City to construction or renovation costs at this time. The action authorizes use of the Design-Build Procurement Method and release of a Request for Qualifications and Proposals (RFQP) for design-build services. Costs associated with preparing and advertising the RFQP will be absorbed within the existing operating budget of the City Manager’s and Public Works/Engineering Departments.
Once proposals are received, staff will return to Council with an evaluation, funding plan, and recommendation for contract award. At that time, Council will consider specific fiscal impacts, including design and construction costs, available funding sources, and any necessary budget amendments.
CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines because the action is the approval of the use of the Design-Build Procurement Method and to release an RFQP for design-build services to convert the former MCCF into a Police Department headquarters and therefore, it is organizational and administrative activity that will not result in direct or indirect physical changes to the environment and not subject to CEQA.
APPROVED BY THE CITY ATTORNEY
ATTACHMENTS
None
MANAGEMENT REPORT
CITY OF SHAFTER
CITY COUNCIL REPORT
MEETING DATE: September 16, 2025
DEPARTMENT: Marco Martinez, City Attorney
SUBJECT: RESOLUTION APPROVING RESPONSE TO THE 2024-2025
KERN COUNTY GRAND JURY REPORT ON THE OPERATIONS
AND MANAGEMENT OF THE CITY OF SHAFTER
RECOMMENDATION
Council find that the action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines; adopt Resolution No. 3043, a Resolution of the City Council of the City of Shafter Approving a response to the 2024-2025 Kern County Grand Jury Report on the Operation and Management of the City of Shafter and directing a response to the Presiding Judge and Grand Jury Foreperson.
BACKGROUND
On June 17, 2025, the City of Shafter (“City”) received a report from the 2024-2025 Kern County Grand Jury (“Grand Jury Report”) concerning certain operations of the City of Shafter. More specifically, the Grand Jury Report evaluated the City Council’s familiarity with its City Charter and adopted Norms and Protocols concerning their accountability to the public. In addition, the Grand Jury Report analyzed certain operations of the Shafter Police Department and the City Animal Shelter. Pursuant to California Penal Code Section 933, “[N]o later than 90 days after the grand jury submits a final report on the operations of any public agency subject to its reviewing authority, the governing body of the public agency shall comment to the presiding judge of the superior court on the findings and recommendations pertaining to matters under the control of the governing body…” (See Penal Code, Section 933(c)).
The attached Resolution adopts the City’s comments/responses to the Grand Jury Report and informs that:
1. On July 15, 2025, the City Council adopted: A RESOLUTION OF THE CITY
COUNCIL OF THE CITY OF SHAFTER ESTABLISHING GOVERNANCE NORMS AND PROTOCOLS FOR THE CONDUCT OF PUBLIC BUSINESS; and,
2. On August 5, 2025, the City Council adopted: AN ORDINANCE OF THE CITY
COUNCIL OF THE CITY OF SHAFTER ADOPTING ENFORCEMENT PROCEDURES
FOR VIOLATIONS OF COUNCIL GOVERNANCE NORMS AND PROTOCOLS, CITY
ORDINANCES AND CHARTER PROVISIONS AND STATE AND LOCAL LAWS IN ACCORDANCE WITH THE CHARTER OF THE CITY OF SHAFTER.
3. On September 11, 2025 the City published the Governance Norms and Protocols, as well as the ordinance adopting enforcement procedures on the City’s
RESOLUTION APPROVING RESPONSE TO THE 2024-2025 KERN COUNTY GRAND JURY
REPORT ON THE OPERATIONS AND MANAGEMENT OF THE CITY OF SHAFTER - 2 -
Website.
4. The City has ordered an identification sign for the Shafter Police Department facility located at 201 Central Valley Highway, Shafter, Ca.
The Resolution adopting the City’s comments and response to the Grand Jury Report authorize the Mayor and City Manager to draft a letter transmitting the Grant Jury Report.
FISCAL IMPACT
The Grand Jury Report advises the City of Shafter to purchase an identification sign for the City Police Department. The proposed sign will cost the City less than $10,000.
CEQA ANALYSIS
The action is not defined as a “project” per Section 15378(b)(5) of the CEQA Guidelines because the action is approval of a resolution responding to a grand jury report and therefore, it is organizational and administrative activity that will not result in direct or indirect physical changes to the environment and not subject to CEQA.
APPROVED BY THE CITY ATTORNEY
Yes
ATTACHMENTS
1. Shafter - 2025 Letter in Response to Grand Jury Report-c1
2. Resolution No. 3043