Solana Beach City Council Regular Meeting Agenda May 22, 2024 Page 1 of 8
CITY OF SOLANA BEACH
SOLANA BEACH CITY COUNCIL, SUCCESSOR AGENCY TO THE REDEVELOPMENT
AGENCY, PUBLIC FINANCING AUTHORITY, & HOUSING AUTHORITY AGENDA
Joint REGULAR Meeting
Wednesday, May 22, 2024 * 6:00 p.m.
City Hall / Council Chambers, 635 S. Highway 101, Solana Beach, California ➢ City Council meetings are video recorded and archived as a permanent record. The video recording captures the complete proceedings of the meeting and is available for viewing on the City's website. ➢ Posted Reports & Supplemental Docs contain records up to the cut off time prior to meetings for processing new submittals. Complete records containing meeting handouts, PowerPoints, etc. can be obtained through a Records Request.
PUBLIC MEETING ACCESS
The Regular Meetings of the City Council are scheduled for the 2nd and 4th Wednesdays and are broadcast live. The video taping of meetings are maintained as a permanent record and contain a detailed account of the proceedings. Council meeting tapings are archived and available for viewing on the City’s Public Meetings webpage.
WATCH THE MEETING
• Live web-streaming: Meetings web-stream live on the City’s website on the City’s Public Meetings webpage. Find the large Live Meeting button.
• Live Broadcast on Local Govt. Channel: Meetings are broadcast live on Cox Communications - Channel 19 / Spectrum (Time Warner)-Channel 24 / AT&T U-verse Channel 99. • Archived videos online: The video taping of meetings are maintained as a permanent record and contain a detailed account of the proceedings. Council meeting tapings are archived and available for viewing on the City’s Public Meetings webpage.
AGENDA MATERIALS
A full City Council agenda packet including relative supporting documentation is available at City Hall, the Solana Beach Branch Library (157 Stevens Ave.), La Colonia Community Ctr., and online www.cityofsolanabeach.org. Agendas are posted at least 72 hours prior to regular meetings and at least 24 hours prior to special meetings. Writings and documents regarding an agenda of an open session meeting, received after the official posting, and distributed to the Council for consideration, will be made available for public viewing at the same time. In addition, items received at least 1 hour 30 minutes prior to the meeting time will be uploaded online with the agenda posting. Materials submitted for consideration should be forwarded to the City Clerk’s department 858-720-2400. The designated location for viewing of hard copies is the City Clerk’s office at City Hall during normal business hours.
PUBLIC COMMENTS
Written correspondence (supplemental items) regarding an agenda item at an open session meeting should be submitted to the City Clerk’s Office at [email protected] with a) Subject line to include the meeting date b) Include the Agenda Item # as listed on the Agenda. o Correspondence received after the official posting of the agenda, but two hours prior to the meeting start time, on the meeting day, will be distributed to Council and made available online along with the agenda posting. All submittals received before the start of the meeting will be made part of the record. o Written submittals will be added to the record and not read out loud.
And/Or
Verbal Comment Participation:
Please submit a speaker slip to the City Clerk prior to the meeting, or the announcement of the Section/Item, to provide public comment. Allotted times for speaking are outlined on the speaker’s slip for each agenda section: Oral Communications, Consent, Public Hearings and Staff Reports.
Public speakers have 3 minutes each to speak on each topic. Time may be donated by another Solana Beach City Council Regular Meeting Agenda May 22, 2024 Page 2 of 8 individual who is present at the meeting to allow an individual up to 6 minutes to speak. Group: Time may be donated by two individuals who are present at the meeting allowing an individual up to 10 minutes to speak. Group Hearings: For public hearings only, time may be donated by two individuals who are present at the meeting allowing an individual up to 15 minutes to speak.
COUNCIL DISCLOSURE
Pursuant to the Levine Act (Gov’t Code Section 84308), any party to a permit, license, contract (other than competitively bid, labor or personal employment contracts) or other entitlement before the Council is required to disclose on the record any contribution, including aggregated contributions, of more than $250 made by the party or the party’s agents within the preceding 12 months to any Council Member. Participants and agents are requested to make this disclosure as well. The disclosure must include the name of the party or participant and any other person making the contribution, the name of the recipient, the amount of the contribution, and the date the contribution was made.
SPECIAL ASSISTANCE NEEDED
In compliance with the Americans with Disabilities Act of 1990, persons with a disability may request an agenda in appropriate alternative formats as required by Section 202. Any person with a disability who requires a modification or accommodation in order to participate in a meeting should direct such request to the City Clerk’s office (858) 720-2400 at least 72 hours prior to the meeting.
As a courtesy to all meeting attendees, please set all electronic devices to silent mode and engage in conversations outside the Council Chambers.
CITY COUNCILMEMBERS
Lesa Heebner
Mayor
Jewel Edson
Deputy Mayor / Councilmember District 3
Kristi Becker
Councilmember District 2
Jill MacDonald
Councilmember District 4
David A. Zito
Councilmember District 1
Alyssa Muto
City Manager
Johanna Canlas
City Attorney
Angela Ivey
City Clerk
SPEAKERS:
Please submit your speaker slip to the City Clerk prior to the meeting or the announcement of the Item. Allotted times for speaking are outlined on the speaker’s slip for Oral Communications, Consent, Public Hearings and Staff Reports.
READING OF ORDINANCES AND RESOLUTIONS:
Pursuant to Solana Beach Municipal Code Section 2.04.460, at the time of introduction or adoption of an ordinance or adoption of a resolution, the same shall not be read in full unless after the reading of the title, further reading is requested by a member of the Council. If any Councilmember so requests, the ordinance or resolution shall be read in full. In the absence of such a request, this section shall constitute a waiver by the council of such reading.
CALL TO ORDER AND ROLL CALL:
CLOSED SESSION REPORT:
FLAG SALUTE:
Solana Beach City Council Regular Meeting Agenda May 22, 2024 Page 3 of 8 APPROVAL OF AGENDA:
PROCLAMATIONS/CERTIFICATES: Ceremonial
None at the posting of this agenda
PRESENTATIONS: Ceremonial items that do not contain in-depth discussion and no action/direction.
None at the posting of this agenda
ORAL COMMUNICATIONS:
Comments relating to items on this evening’s agenda are taken at the time the items are heard. This portion of the agenda provides an opportunity for members of the public to address the City Council on items relating to City business and not appearing on today’s agenda by submitting a speaker slip (located on the back table) to the City Clerk. Pursuant to the Brown Act, no action shall be taken by the City Council on public comment items. Council may refer items to the City Manager for placement on a future agenda. The maximum time allotted for each presentation is THREE MINUTES. No donations of time are permitted (SBMC 2.04.190). Please be aware of the timer light on the Council Dais.
COUNCIL COMMUNITY ANNOUNCEMENTS / COMMENTARY:
An opportunity for City Council to make brief announcements or report on their activities. These items are not agendized for official City business with no action or substantive discussion.
A. CONSENT CALENDAR: (Action Items) (A.1. - A.6.)
Items listed on the Consent Calendar are to be acted in a single action of the City Council unless pulled for discussion. Any member of the public may address the City Council on an item of concern by submitting to the City Clerk a speaker slip (located on the back table) before the Consent Calendar is addressed. Those items removed from the Consent Calendar by a member of the Council will be trailed to the end of the agenda, while Consent Calendar items removed by the public will be heard immediately after approval of the Consent Calendar to hear the public speaker.
All speakers should refer to the public comment section at the beginning of the agenda for details.
Please be aware of the timer light on the Council Dais.
A.1. Minutes of the City Council.
Recommendation: That the City Council
1. Approve the Minutes of the City Council meetings held on April 24, 2024.
Item A.1. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
A.2. Register Of Demands. (File 0300-30)
Recommendation: That the City Council
1. Ratify the list of demands for April 20, 2024 – May 03, 2024.
Item A.2. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
Solana Beach City Council Regular Meeting Agenda May 22, 2024 Page 4 of 8 A.3. General Fund Adopted Budget for Fiscal Year 2023/2024 Changes. (File 0330-30) Recommendation: That the City Council
1. Receive the report listing changes made to the Fiscal Year 2023-2024 General Fund Adopted Budget.
Item A.3. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
A.4. Solana Beach Coastal Rail Trail Maintenance District Preliminary Engineer’s Report, Annual Levy, and Collection of Assessments – Fiscal Year 2024/25. (File 0495-20)
Recommendation: That the City Council
1. Adopt Resolution 2024-046, initiating the proceedings for the annual levy of assessments within the Coastal Rail Trail Maintenance District for Fiscal Year 2024/25.
2. Adopt Resolution 2024-047, approving the Preliminary Engineer's Report for proceedings of the annual levy of assessments within Coastal Rail Trail Maintenance District.
3. Adopt Resolution 2024-048, declaring intention to provide for the annual levy and collection of assessments in Coastal Rail Trail Maintenance District and setting a time and date for a public hearing for June 26, 2024.
Item A.4. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
A.5. Solana Beach Lighting Maintenance District Engineer’s Report, Annual Levy, and Collection of Assessments - Fiscal Year 2024/25. (File 0495-20) Recommendation: That the City Council
1. Adopt Resolution 2024-049 approving the Solana Beach Lighting Maintenance District Engineer’s Report for Fiscal Year 2024/25 for proceedings of the annual levy of assessments within a special maintenance district.
2. Adopt Resolution 2024-050 declaring intention to provide for an annual levy and collection of assessment in a special maintenance district and setting a time and date for a public hearing; and scheduling the public hearing for June 26, 2024.
Item A.5. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
Solana Beach City Council Regular Meeting Agenda May 22, 2024 Page 5 of 8 A.6. Exterior Painting and Stucco Repairs at City Hall - Notice of Completion. (File 0710-20)
Recommendation: That the City Council
1. Adopt Resolution 2024-060:
a. Ratifying the City Manager’s decision to execute Change Order No. 1 to the construction contract with Polychrome Construction, Inc., in an amount of $39,085, for a total amount of $86,830, for Fiscal Year 2023/24. b. Authorizing the City Clerk to file a Notice of Completion.
Item A.6. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
NOTE: The City Council shall not begin a new agenda item after 10:30 p.m. unless approved by a unanimous vote of all members present. (SBMC 2.04.070) B. PUBLIC HEARINGS: (B.1. - B.3.)
This portion of the agenda provides citizens an opportunity to express their views on a specific issue as required by law after proper noticing by submitting a speaker slip (located on the back table) to the City Clerk. After considering all of the evidence, including written materials and oral testimony, the City Council must make a decision supported by findings and the findings must be supported by substantial evidence in the record. An applicant or designee(s) for a private development/business project, for which the public hearing is being held, is allotted a total of fifteen minutes to speak, as per SBMC 2.04.210. A portion of the fifteen minutes may be saved to respond to those who speak in opposition. All other speakers should refer to the public comment section at the beginning of the agenda for time allotment. Please be aware of the timer light on the Council Dais.
B.1. Public Hearing: 135 S. Sierra, Applicant: Las Brisas HOA, Case No: TE23-002, APN: 298-010-51-01 to 36. (File 0600-40)
Recommendation: That the City Council
1. Conduct the Public Hearing: Open the Public Hearing, Report Council Disclosures, Receive Public Testimony, and Close the Public Hearing.
2. If the City Council can make the required findings, adopt Resolution 2024-029, approving the request for a Time Extension for approvals and entitlements in Case No. CUP20-004 and setting the expiration date as February 9, 2025.
Item B.1. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
Solana Beach City Council Regular Meeting Agenda May 22, 2024 Page 6 of 8 B.2. Public Hearing: 255-265 Pacific Ave., Applicant: Alamo Family Trust, Sivage Family Revocable Trust, Bradley and Susan Stone, Case: MOD24-002. (File 0600-40)
The proposed project meets the minimum zoning requirements under the SBMC, is consistent with the General Plan and may be found, as conditioned, to meet the discretionary findings to approve a modification to the approved CUP. Therefore, Staff recommends that the City Council:
1. Conduct the Public Hearing: Open the Public Hearing, Report Council Disclosures, Receive Public Testimony, and Close the Public Hearing.
2. Find the project exempt from the California Environmental Quality Act.
3. If the City Council makes the requisite findings and approves the project, adopt Resolution 2024-061 conditionally approving a modification to the CUP for backfilling of existing eroded gullies within the existing geogrid reinforced slope, installation of secondary geogrid in the backfill of the gully repair, installation of temporary irrigation, and revegetation of the upper bluff with native container plants and hydroseeding on the coastal bluff below 255, 261, and 265 Pacific Avenue, Solana Beach.
Item B.2. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
B.3. Public Hearing: Regional Transportation Improvement Program (RTIP) for Fiscal Years 2025-2029. (File 0840-30)
Recommendation: That the City Council
1. Conduct the Public Hearing: Open the Public Hearing, Report Council Disclosures, Receive Public Testimony, and Close the Public Hearing.
2. Consider Adoption of Resolution 2024-042, approving the 2025 Regional Transportation Improvement Program for Fiscal Years (FY) 2024/25 through FY 2028/29.
Item B.3. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
C. STAFF REPORTS: (C.1.)
Submit speaker slips to the City Clerk.
All speakers should refer to the public comment section at the beginning of the agenda for time allotments. Please be aware of the timer light on the Council Dais.
C.1. Glencrest Sidewalk Project Update. (File 0820-45)
Recommendation: That the City Council
1. Receive report and provide direction to Staff.
Item C.1. Report (click here)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
Solana Beach City Council Regular Meeting Agenda May 22, 2024 Page 7 of 8 WORK PLAN COMMENTS:
Adopted June 28, 2023
COMPENSATION & REIMBURSEMENT DISCLOSURE:
GC: Article 2.3. Compensation: 53232.3. (a) Reimbursable expenses shall include, but not be limited to, meals, lodging, and travel. 53232.3 (d) Members of a legislative body shall provide brief reports on meetings attended at the expense of the local agency “City” at the next regular meeting of the legislative body.
COUNCIL COMMITTEE REPORTS: Council Committees
REGIONAL COMMITTEES: (outside agencies, appointed by this Council) a. City Selection Committee (meets twice a year) Primary-Heebner, Alternate-Edson b. Clean Energy Alliance (CEA) JPA: Primary-Becker, Alternate-Zito c. County Service Area 17: Primary-MacDonald, Alternate-Edson d. Escondido Creek Watershed Authority: Becker / Staff (no alternate). e. League of Ca. Cities’ San Diego County Executive Committee: Primary-MacDonald, Alternate-Becker. Subcommittees determined by its members. f. League of Ca. Cities’ Local Legislative Committee: Primary-MacDonald, AlternateBecker g. League of Ca. Cities’ Coastal Cities Issues Group (CCIG): Primary-MacDonald, Alternate-Becker
h. North County Dispatch JPA: Primary-MacDonald, Alternate-Becker i. North County Transit District: Primary-Edson, Alternate-MacDonald j. Regional Solid Waste Association (RSWA): Primary-Zito, Alternate-MacDonald k. SANDAG: Primary-Heebner, 1st Alternate-Zito, 2nd Alternate-Edson. Subcommittees determined by its members.
l. SANDAG Shoreline Preservation Committee: Primary-Becker, Alternate-Zito m. San Dieguito River Valley JPA: Primary-MacDonald, Alternate-Becker n. San Elijo JPA: Primary-Zito, Primary-Becker, Alternate-City Manager o. 22nd Agricultural District Association Community Relations Committee: Primary-Edson, Primary-Heebner
STANDING COMMITTEES: (All Primary Members) (Permanent Committees) a. Business Liaison Committee – Zito, Edson
b. Fire Dept. Management Governance & Organizational Evaluation – Edson, MacDonald
c. Highway 101 / Cedros Ave. Development Committee – Heebner, Edson d. Parks and Recreation Committee – Zito, Edson
e. Public Arts Committee – Edson, Heebner
f. School Relations Committee – Becker, MacDonald
g. Solana Beach-Del Mar Relations Committee – Heebner, Edson
CITIZEN COMMISSION(S)
a. Climate Action Commission – Zito, Becker
ADJOURN:
Next Regularly Scheduled Meeting is June 12, 2024
Always refer to the City’s website Event Calendar for an updated schedule or contact City Hall. www.cityofsolanabeach.org 858-720-2400
Solana Beach City Council Regular Meeting Agenda May 22, 2024 Page 8 of 8
AFFIDAVIT OF POSTING
STATE OF CALIFORNIA
COUNTY OF SAN DIEGO
CITY OF SOLANA BEACH
§
I, Angela Ivey, City Clerk of the City of Solana Beach, do hereby certify that this Agenda for the May 22, 2024 Council Meeting was called by City Council, Successor Agency to the Redevelopment Agency, Public Financing Authority, and the Housing Authority of the City of Solana Beach, California, was provided and posted on May 16, 2024 at 9:45 a.m. on the City Bulletin Board at the entrance to the City Council Chambers. Said meeting is held at 6:00 p.m., May 22, 2024, in the Council Chambers, at City Hall, 635 S. Highway 101, Solana Beach, California.
Angela Ivey, City Clerk
City of Solana Beach, CA
UPCOMING CITIZEN CITY COMMISSION AND COMMITTEE MEETINGS:
Regularly Scheduled, or Special Meetings that have been announced, are posted on each Citizen Commission’s Agenda webpage. See the Citizen Commission’s Agenda webpages or the City’s Events Calendar for updates. o Budget & Finance Commission
o Climate Action Commission
o Parks & Recreation Commission
o Public Arts Commission
o View Assessment Commission
}
Solana Beach City Council Closed Session Agenda April 24, 2024 Page 1 of 1
CITY OF SOLANA BEACH
SOLANA BEACH CITY COUNCIL, SUCCESSOR AGENCY TO THE REDEVELOPMENT
AGENCY, PUBLIC FINANCING AUTHORITY, & HOUSING AUTHORITY
MINUTES
Joint Meeting - Closed Session
Wednesday, April 24, 2024 5:00 p.m.
City Hall / Council Chambers, 635 S. Highway 101, Solana Beach, California
CITY COUNCILMEMBERS
Lesa Heebner
Mayor
Jewel Edson
Deputy Mayor / Councilmember District 3
Kristi Becker
Councilmember District 2
Jill MacDonald
Councilmember District 4
David A. Zito
Councilmember District 1
Daniel King
Interim City Manager
Johanna Canlas
City Attorney
Angela Ivey
City Clerk
CALL TO ORDER AND ROLL CALL:
Mayor Heebner called the meeting to order at 5:55 p.m.
Present: Lesa Heebner, David A. Zito, Jewel Edson, Kristi Becker, Jill MacDonald
Absent: None
Also Present: Dan King, Interim City Manager
Johanna Canlas, City Attorney
PUBLIC COMMENT ON CLOSED SESSION ITEMS (ONLY):
Report to Council Chambers and submit speaker slips to the City Clerk before the meeting recesses to closed session.
CLOSED SESSION:
1. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION
Pursuant to Government Code Section 54956.9(d)(1)
- MacDonald v. City of Solana Beach (37-2023-00038867-CU-PO-CTL)
2. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION Pursuant to Government Code Section 54956.9(d)(2)
One (1) Potential case(s).
No reportable action.
ADJOURN:
Mayor Heebner adjourned the meeting at 5:55 p.m.
Angela Ivey, City Clerk Approved: ___________________
Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 1 of 11
CITY OF SOLANA BEACH
SOLANA BEACH CITY COUNCIL, SUCCESSOR AGENCY TO THE REDEVELOPMENT
AGENCY, PUBLIC FINANCING AUTHORITY, & HOUSING AUTHORITY
MINUTES
Joint REGULAR Meeting
Wednesday, April 24, 2024 * 6:00 p.m.
City Hall / Council Chambers, 635 S. Highway 101, Solana Beach, California City Council meetings are video recorded and archived as a permanent record. The video recording captures the complete proceedings of the meeting and is available for viewing on the City's website. Posted Reports & Supplemental Docs contain records up to the cut off time prior to meetings for processing new submittals. Complete records containing meeting handouts, PowerPoints, etc. can be obtained through a Records Request.
PUBLIC MEETING ACCESS
The Regular Meetings of the City Council are scheduled for the 2nd and 4th Wednesdays and are broadcast live. The video taping of meetings are maintained as a permanent record and contain a detailed account of the proceedings. Council meeting tapings are archived and available for viewing on the City’s Public Meetings webpage.
WATCH THE MEETING
• Live web-streaming: Meetings web-stream live on the City’s website on the City’s Public Meetings webpage. Find the large Live Meeting button.
• Live Broadcast on Local Govt. Channel: Meetings are broadcast live on Cox Communications - Channel 19 / Spectrum (Time Warner)-Channel 24 / AT&T U-verse Channel 99. • Archived videos online: The video taping of meetings are maintained as a permanent record and contain a detailed account of the proceedings. Council meeting tapings are archived and available for viewing on the City’s Public Meetings webpage.
AGENDA MATERIALS
A full City Council agenda packet including relative supporting documentation is available at City Hall, the Solana Beach Branch Library (157 Stevens Ave.), La Colonia Community Ctr., and online www.cityofsolanabeach.org. Agendas are posted at least 72 hours prior to regular meetings and at least 24 hours prior to special meetings. Writings and documents regarding an agenda of an open session meeting, received after the official posting, and distributed to the Council for consideration, will be made available for public viewing at the same time. In addition, items received at least 1 hour 30 minutes prior to the meeting time will be uploaded online with the agenda posting. Materials submitted for consideration should be forwarded to the City Clerk’s department 858-720-2400. The designated location for viewing of hard copies is the City Clerk’s office at City Hall during normal business hours.
PUBLIC COMMENTS
Written correspondence (supplemental items) regarding an agenda item at an open session meeting should be submitted to the City Clerk’s Office at [email protected] with a) Subject line to include the meeting date b) Include the Agenda Item # as listed on the Agenda. o Correspondence received after the official posting of the agenda, but two hours prior to the meeting start time, on the meeting day, will be distributed to Council and made available online along with the agenda posting. All submittals received before the start of the meeting will be made part of the record. o Written submittals will be added to the record and not read out loud.
And/Or
Verbal Comment Participation:
Please submit a speaker slip to the City Clerk prior to the meeting, or the announcement of the Section/Item, to provide public comment. Allotted times for speaking are outlined on the speaker’s slip for each agenda section: Oral Communications, Consent, Public Hearings and Staff Reports.
Public speakers have 3 minutes each to speak on each topic. Time may be donated by another Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 2 of 11 individual who is present at the meeting to allow an individual up to 6 minutes to speak. Group: Time may be donated by two individuals who are present at the meeting allowing an individual up to 10 minutes to speak. Group Hearings: For public hearings only, time may be donated by two individuals who are present at the meeting allowing an individual up to 15 minutes to speak.
SPECIAL ASSISTANCE NEEDED
In compliance with the Americans with Disabilities Act of 1990, persons with a disability may request an agenda in appropriate alternative formats as required by Section 202. Any person with a disability who requires a modification or accommodation in order to participate in a meeting should direct such request to the City Clerk’s office (858) 720-2400 at least 72 hours prior to the meeting.
As a courtesy to all meeting attendees, please set all electronic devices to silent mode and engage in conversations outside the Council Chambers.
CITY COUNCILMEMBERS
Lesa Heebner
Mayor
Jewel Edson
Deputy Mayor / Councilmember District 3
Kristi Becker
Councilmember District 2
Jill MacDonald
Councilmember District 4
David A. Zito
Councilmember District 1
Dan King
Interim City Manager
Johanna Canlas
City Attorney
Angela Ivey
City Clerk
SPEAKERS:
Please submit your speaker slip to the City Clerk prior to the meeting or the announcement of the Item. Allotted times for speaking are outlined on the speaker’s slip for Oral Communications, Consent, Public Hearings and Staff Reports.
READING OF ORDINANCES AND RESOLUTIONS:
Pursuant to Solana Beach Municipal Code Section 2.04.460, at the time of introduction or adoption of an ordinance or adoption of a resolution, the same shall not be read in full unless after the reading of the title, further reading is requested by a member of the Council. If any Councilmember so requests, the ordinance or resolution shall be read in full. In the absence of such a request, this section shall constitute a waiver by the council of such reading.
CALL TO ORDER AND ROLL CALL:
Mayor Heebner called the meeting to order at 6:03 p.m.
Present: Lesa Heebner, Jewel Edson, Kristi Becker, Jill MacDonald, David A. Zito
Absent: None
Also
Present:
Dan King, Interim City Manager
Johanna Canlas, City Attorney
Angela Ivey, City Clerk
Mo Sammak, City Engineer/Public Works Dir.
Rachel Jacobs, Finance Dir.
Joseph Lim, Community Development Dir.
Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 3 of 11 CLOSED SESSION REPORT: None
FLAG SALUTE:
APPROVAL OF AGENDA:
Motion: Moved by Councilmember Becker and second by Councilmember Zito to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.
Motion carried unanimously.
PROCLAMATIONS/CERTIFICATES: Ceremonial
• Earth Day/Month
Mayor Heebner read a proclamation in honor of Earth Day on April 22nd focusing on environmental awareness and Solana Beach’s efforts to combat climate change. • San Diego County Fair
Mayor Heebner presented a proclamation to Carlene Moore, Del Mar Fairgrounds 22nd District Agricultural Association, recognizing the significance of the annual San Diego County Fair, its history, and partnership with the City, and declaring June 12th San Diego County Fair Day in Solana Beach.
Carlene Moore, CEO Del Mar Fairgrounds 22nd District Agricultural Association, acknowledged the City’s partnership with the Fair and reviewed the upcoming events at the Fair beginning on June 12th.
ORAL COMMUNICATIONS:
Comments relating to items on this evening’s agenda are taken at the time the items are heard.
This portion of the agenda provides an opportunity for members of the public to address the City Council on items relating to City business and not appearing on today’s agenda by submitting a speaker slip (located on the back table) to the City Clerk. Pursuant to the Brown Act, no action shall be taken by the City Council on public comment items. Council may refer items to the City Manager for placement on a future agenda. The maximum time allotted for each presentation is THREE MINUTES. No donations of time are permitted (SBMC 2.04.190). Please be aware of the timer light on the Council Dais.
Terri-Ann Skelly, San Dieguito Alliance for Drug-Free Youth, submitted a handout (on file) and spoke of concerns regarding the sale of kratom, an unregulated psychoactive substance, and highlighted the dangers associated with its use. She asked Council to implement an ordinance like one adopted by the City of Oceanside which bans the sale of kratom and other synthetic drugs.
Peggy Walker, San Dieguito Alliance for Drug-Free Youth, expressed concerns about the sale of kratom in the City and referenced warnings from the FDA and the Mayo Clinic regarding its psychoactive and addictive properties as well as the lack of oversight and age restrictions. She said that the sale of kratom is prevalent in gas stations and café bars and that the long-term effects of these drugs liken its effects to opioids. She urged Council to adopt an ordinance like the one adopted in the City of Oceanside and provide information on the FDAs stance on kratom.
Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 4 of 11 Kelly McCormick, Public Health Educator, asked the Council to ban the sale of kratom products in Solana Beach and referenced an investigative report which highlighted hundreds of overdoses and deaths related to kratom. She said the concerns for the lack of regulation and warning labels, the variability of active ingredients, harmful interactions with other substances, and its addictive nature should be considered for a ban on sales in Solana Beach and asked Council to protect the community.
COUNCIL COMMUNITY ANNOUNCEMENTS / COMMENTARY:
An opportunity for City Council to make brief announcements or report on their activities. These items are not agendized for official City business with no action or substantive discussion.
A. CONSENT CALENDAR: (Action Items) (A.1. - A.9.)
Items listed on the Consent Calendar are to be acted in a single action of the City Council unless pulled for discussion. Any member of the public may address the City Council on an item of concern by submitting to the City Clerk a speaker slip (located on the back table) before the Consent Calendar is addressed. Those items removed from the Consent Calendar by a member of the Council will be trailed to the end of the agenda, while Consent Calendar items removed by the public will be heard immediately after approval of the Consent Calendar to hear the public speaker.
All speakers should refer to the public comment section at the beginning of the agenda for details.
Please be aware of the timer light on the Council Dais.
A.1. Minutes of the City Council.
Recommendation: That the City Council
1. Approve the Minutes of the City Council meetings held on March 13, 2024 and March 27, 2024.
Approved Minutes https://www.cityofsolanabeach.org/en/government/public-meetings/agendas-minutesvideos Motion: Moved by Deputy Mayor Edson and second by Councilmember MacDonald to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.
Motion carried unanimously.
A.2. Register Of Demands. (File 0300-30)
Recommendation: That the City Council
1. Ratify the list of demands for March 23, 2024 – April 5, 2024.
Item A.2. Report (click here)
Motion: Moved by Deputy Mayor Edson and second by Councilmember MacDonald to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.
Motion carried unanimously.
Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 5 of 11 A.3. General Fund Adopted Budget for Fiscal Year 2023/2024 Changes. (File 0330- 30)
Recommendation: That the City Council
1. Receive the report listing changes made to the Fiscal Year 2023-2024 General Fund Adopted Budget.
Item A.3. Report (click here)
Motion: Moved by Deputy Mayor Edson and second by Councilmember MacDonald to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.
Motion carried unanimously.
A.4. Street Maintenance & Repair Project Fiscal Year 2022-23 Notice of Completion. (File 0820-35)
Recommendation: That the City Council
1. Adopt Resolution 2024-004:
a. Authorizing the City Council to accept, as complete, the FY 2022-23 Street Maintenance & Repair Project, Bid No. 2023-07, performed by Quality Construction & Engineering.
b. Authorizing the City Clerk to file a Notice of Completion.
Item A.4. Report (click here)
Motion: Moved by Deputy Mayor Edson and second by Councilmember MacDonald to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.
Motion carried unanimously.
A.5. Security and Alarm Monitoring Services. (File 0700-40) Recommendation: That the City Council
1. Adopt Resolution 2024-026:
a. Authorizing the City Manager to execute a Professional Services Agreement, on behalf of the City, with Rancho Santa Fe Security for security and alarm monitoring services in Fiscal Year 2024/25 in an amount not to exceed $17,000 for Fiscal year 2024/25 from account 1006560-65300. b. Authorizing the City Manager to extend the agreement up to four additional one-year terms, at the City’s option, at an amount not to exceed the amount budgeted in each subsequent year.
c. Authorizing the City Manager to increase the annual not to exceed amount by 5% for FY 2025/26, 4.8% for FY 2026/27, 4.5% for FY 2027/28, 4.3% for FY 2028/29.
d. Authorizing the City Treasurer to amend the Fiscal Year 2024/25 Budget accordingly.
Item A.5. Report (click here)
Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 6 of 11 Motion: Moved by Deputy Mayor Edson and second by Councilmember MacDonald to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.
Motion carried unanimously.
A.6. Trash Abatement Services. (File 0700-25)
Recommendation: That the City Council
1. Adopt Resolution 2024-037:
a. Authorizing the City Manager to execute a Professional Services Agreement with PRIDE Industries, in an amount not to exceed $51,599.69 for FY 2024/25, for trash abatement, minor landscaping and other duties as assigned in public areas to be split between Street Sweeping account 1006550-65300 and Public Facilities account 1006570-65300.
b. Authorizing the City Manager to extend the agreement for up to four additional one-year terms at the City’s option in an amount not to exceed $51,599.69 per year.
c. Authorizing the City Treasurer to amend the FY 2024/25 Adopted Budget accordingly.
Item A.6. Report (click here)
Motion: Moved by Deputy Mayor Edson and second by Councilmember MacDonald to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.
Motion carried unanimously.
A.7. Street Maintenance and Repairs Project Fiscal Year 2023-24. (File 0820-35) Recommendation: That the City Council
1. Adopt Resolution 2024-043:
a. Approving the list of streets scheduled for maintenance and repairs as part of the 2023/24 Street Maintenance and Repairs Project.
b. Authorizing the City Engineer to advertise for construction bids for the 2023/24 Street Maintenance and Repairs Project.
Item A.7. Report (click here)
Motion: Moved by Deputy Mayor Edson and second by Councilmember MacDonald to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.
Motion carried unanimously.
A.8. Americans with Disability Act (ADA) Pedestrian Ramps. (File 0820-20) Recommendation: That the City Council
1. Adopt Resolution 2024-041:
a. Awarding a construction contract to LC Paving & Sealing in the amount of $54,300 for the ADA Pedestrian Ramps, Bid No. 2024-05.
b. Approving an amount of $5,430 for construction contingency. c. Authorizing the City Manager to execute the construction contract on behalf of the City.
d. Appropriating $6,921 to the Federal Grants revenue account and to the ADA Pedestrian Ramps CIP project, both in the CDBG fund.
Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 7 of 11 e. Appropriating $7,809 to the ADA Pedestrian Ramps CIP project from Gas Tax. f. Authorizing the City Treasurer to amend the FY 2023/24 Adopted Budget accordingly.
Item A.8. Report (click here)
Motion: Moved by Deputy Mayor Edson and second by Councilmember MacDonald to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.
Motion carried unanimously.
.
A.9. Temporary Lifeguard Supervisor Position Addition. (File 0510-00) Recommendation: That the City Council
1. Approve Resolution 2024-044 approving the Temporary/Seasonal Lifeguard Supervisor classification and updating the FY 2023/2024 Temporary/PartTime/Seasonal Salary Schedule 6 accordingly.
Item A.9. Report (click here)
Motion: Moved by Deputy Mayor Edson and second by Councilmember MacDonald to approve. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None.
Motion carried unanimously.
B. PUBLIC HEARINGS: (B.1.)
This portion of the agenda provides citizens an opportunity to express their views on a specific issue as required by law after proper noticing by submitting a speaker slip (located on the back table) to the City Clerk. After considering all of the evidence, including written materials and oral testimony, the City Council must make a decision supported by findings and the findings must be supported by substantial evidence in the record. An applicant or designee(s) for a private development/business project, for which the public hearing is being held, is allotted a total of fifteen minutes to speak, as per SBMC 2.04.210. A portion of the fifteen minutes may be saved to respond to those who speak in opposition. All other speakers should refer to the public comment section at the beginning of the agenda for time allotment. Please be aware of the timer light on the Council Dais.
B.1. Public Hearing: 718-732 Stevens Avenue, Applicant: 3981 Garfield St. LLC, Case No: DRP22-003/SMP22-001/SDP22-001, APN: 298-164-10 & 13. (File 0600- 40)
The proposed project meets the minimum zoning requirements under the SBMC, may be found to be consistent with the General Plan and may be found, as conditioned, to meet the discretionary findings required as discussed in this report to approve a DRP and Major Subdivision. Therefore, should the City Council be able to make the findings to approve the DRP and SMAP, Staff recommends that the City Council:
1. Conduct the Public Hearing: Open the Public Hearing, Report Council Disclosures, Receive Public Testimony, and Close the Public Hearing.
2. Find the project exempt from the California Environmental Quality Act pursuant to Section 15332 of the State CEQA Guidelines; and
Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 8 of 11
3. If the City Council can make the requisite findings and approve the Project, adopt Resolution 2024-045 conditionally approving a DRP, SMAP, and SDP for the Stevens 13 Avenue Project at 718-732 Stevens Avenue, Solana Beach.
Item B.1. Report (click here)
Item B.1. Updated Report #1 (added 4-24-24 at 12:15pm)
Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals.
The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
Dan King, Interim City Manager, introduced the item.
Corey Andrews, Principal Planner, presented a PowerPoint (on file).
Mayor Heebner opened the public hearing.
Council disclosures.
Council and Staff discussed height of the buildings, parking layout, trash enclosure size, solar panel installation, fire access, the potential impact on stormwater runoff into nearby Stevens Creek, assurances regarding compliance with building codes, fire safety standards, and stormwater management requirements, the feasibility of certain design elements, such as the turning radius for parking and the adequacy of the trash enclosure size, and the possibility of incorporating permeable surfaces for parking areas to mitigate runoff impacts.
Tim Golba, Golba Architecture, presented a PowerPoint (on file) of the design concepts for the proposed development project, highlighting key aspects such as site layout, building placement, parking arrangements, and landscaping. He reviewed the efforts to integrate the project with the existing neighborhood while utilizing the site's topography to create a balanced and visually appealing design, and the engagement with neighbors through the sharing of renderings to provide a realistic visualization of the project's impact.
Council and Applicant discussed the garage parking and the allowance for additional parking outside of the garages as surplus guest parking, the design feature to prevent easy access between units for the safety and accessibility of roof decks between buildings, the choice of materials for railings and openness to using glass railings for visibility, considering native and drought-tolerant plant materials for landscaping, and utilizing garage spaces for parking rather than storage.
Lawrence and Melissa Gallego presented posters and said that the project was a threestory building towering over their backyard and disrupting their view and privacy, that there were issues regarding parking, sunlight, and the invasion of privacy due to the height of the building and the positioning of decks, and asked Council to mitigate these concerns by reducing the height of the building and the number of units.
Danny Hernandez said that he had concerns about the proposed three-story buildings, worries about parking and traffic congestion, particularly regarding the tightness of the driveways in the proposed development, that the neighborhood was predominantly zoned for two-story buildings and suggested that reducing the height of the new development would better align with the character of the area.
Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 9 of 11 Tara Hernandez said she was speaking in support of neighbors Melissa and Larry Gallegos and that she empathized with her neighbors' situation, as a similar issue had occurred with her own property, that the project's size had an impact on shadows cast on neighboring houses, that she advocated for reducing the project to two stories to preserve the character of the neighborhood and prevent future developments from overshadowing the area.
Maura Griffin said that the building heights in the area should remain unchanged, the need for the building to be lowered, that more green space be included, and concerns about the number of units proposed for the development.
Richard Cordes said that he opposed the proposed development, citing concerns about the impact on the scenic view of Stevens Creek Valley from Hernandez Street that the proposed building was a giant that they do not want in the area, and that it should be reduced in size.
Chad Arendsen stated concerns about the proposed development's impact on the neighborhood's character and affordability, the importance of balancing return on investment (ROI) with community needs, that the proposed density increase does not adequately benefit the community, particularly in terms of affordable housing, and urged Council to consider making the project conform to existing regulations by limiting height and maintaining a lower unit count to better align with community interests.
PJ Chryssostomides, Applicant, said that they originally planned to build 11 units instead of nine, that this layout was a result of working with the City to meet all requirements, that the height of the existing buildings are 30 ft., that the density bonus was warranted given the affordable housing component, that the project was carefully planned to mitigate issues with parking and height, that the project would enhance the community preserving the neighborhood's character while providing much-needed housing, and that landscape plans would minimize visual impact on neighboring properties.
Council and Applicant discussed that the reduction of the height of the back buildings was not economically feasible, that they would be willing to remove rooftop decks if the community felt they were not historically appropriate, that the developer agreed to consider using solid railings instead of glass at the back to provide more privacy to neighboring properties, and that landscaping options should be chosen to soften the visual impact of the development.
Johanna Canlas, City Attorney, explained the limitations imposed by state law on the Council’s discretion regarding land use decisions and were required to adhere to objective standards and could not change them to reduce density.
Council discussed their limitations and frustration with the process and encouraged the community to advocate for restoring local land use authority to cities.
Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 10 of 11 Motion: Moved by Councilmember Zito and second by Deputy Mayor Edson to close the public hearing. Approved 5/0. Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes:
None. Motion carried unanimously.
Council discussed modifications and requested that the Applicant work with the neighbors in choosing appropriate vegetation for the east end of the project to shield the project’s view.
Motion: Moved by Deputy Mayor Edson and second by Councilmember MacDonald to approve. Approved 5/0 with modifications to 1) remove roof decks 2) garages be used for parking 3) that rear balcony rails be opaque and not see through 4) increase vegetation on east end of project 5) native and drought tolerant plantings where feasibility.
Ayes: Heebner, Edson, Becker, MacDonald, Zito. Noes: None. Motion carried unanimously.
Mayor Heebner recessed the meeting at 7:55 p.m. for a break and reconvened at 8:02 p.m.
C. STAFF REPORTS: (C.1.)
Submit speaker slips to the City Clerk.
All speakers should refer to the public comment section at the beginning of the agenda for time allotments. Please be aware of the timer light on the Council Dais.
C.1. Public Right-of-Way Parkway Surface Alternatives. (File 0820-18) Recommendation: That the City Council
1. Receive report, discuss and provide direction, as necessary.
Item C.1. Report (click here)
Item C.1. Supplemental Docs (updated 4-24-24 at 5:25pm) Posted Reports & Supplemental Docs contain records up to the cut off time, prior to the start of the meeting, for processing new submittals. The final official record containing handouts, PowerPoints, etc. can be obtained through a Records Request to the City Clerk’s Office.
Dan King, Interim City Manager, introduced the item.
Mo Sammak, Engineering/Public Works Dir., presented a PowerPoint (on file) giving an overview of the current state of right-of-way improvements and seeking direction from the Council on potential alternative options.
Catherine Barnes expressed support for expanding options for approved ground coverings in the right-of-way areas in front of houses and said that there were benefits of decomposed granite (DG) in certain circumstances but highlighted its limitations, particularly on sloped properties where it can cause runoff issues and create hazards for pedestrians, especially those with disabilities. She suggested alternative options such as pavers to achieve a balance of safety, aesthetics, and environmental responsibility.
Council discussion centered on finding suitable surface options for city rights-of-way, particularly driveways and parking areas, the use of Decomposed Granite (DG) and alternative options for surfacing public areas and walkways, that DG is favored for its rural Solana Beach City Council Regular Meeting Minutes April 24, 2024 Page 11 of 11 and informal look, but it may not be suitable for all locations, such as steep slopes and areas prone to water runoff, the issues with DG maintenance including the breakdown of bonding agents and the need for frequent restoration, the need for surfaces to be walkable and compatible with mobility aids like walkers and wheelchairs for safety and accessibility, alternative materials like pavers, stamped concrete, and crushed rock, developing guidelines and policies for right-of-way improvements, questions about permit fees for maintenance projects in the right-of-way and possible reduced fees for such projects, and the need for a balance between aesthetics, environmental impact, safety, and maintenance when selecting surfacing materials for public areas.
WORK PLAN COMMENTS:
Adopted June 28, 2023
Mayor Heebner said that she expected a public speaker requesting that Cipriana Gonzales be considered for a La Colonia commemorative plaque on the tot lot.
COMPENSATION & REIMBURSEMENT DISCLOSURE: None
GC: Article 2.3. Compensation: 53232.3. (a) Reimbursable expenses shall include, but not be limited to, meals, lodging, and travel. 53232.3 (d) Members of a legislative body shall provide brief reports on meetings attended at the expense of the local agency “City” at the next regular meeting of the legislative body.
COUNCIL COMMITTEE REPORTS: Council Committees
REGIONAL COMMITTEES: (outside agencies, appointed by this Council) ADJOURN:
Mayor Heebner adjourned the meeting at 9:04 p.m.
Angela Ivey, City Clerk Approved: ______________________ CITY COUNCIL ACTION: ____________________________________________________ _________________________________________________________________________ AGENDA ITEM # A.2.
STAFF REPORT
CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: May 22, 2024
ORIGINATING DEPT: Finance
SUBJECT: Register of Demands
BACKGROUND:
Section 3.04.020 of the Solana Beach Municipal Code requires that the City Council ratify a register of demands which represents all financial demands made upon the City for the applicable period.
DISCUSSION:
Staff certifies that the register of demands has been reviewed for accuracy, that funds are available to pay the above demands, and that the demands comply with the adopted budget.
CEQA COMPLIANCE STATEMENT:
Not a project as defined by CEQA.
FISCAL IMPACT:
The register of demands for April 20, 2024 through May 3, 2024 reflects total expenditures of $1,236,953.73 from various City sources.
WORK PLAN:
N/A
Register of Demands: 04/20/2024 through 05/03/2024
Check Register - Disbursement Fund (Attachment 1) $ 933,661.19 Net Payroll Retiree Health May 3, 2024 2,975.00
Net Payroll Staff O22 April 26, 2024 300,317.54
TOTAL $ 1,236,953.73
May 22, 2024
Register of Demands
OPTIONS:
• Ratify the register of demands.
• Do not ratify and provide direction.
DEPARTMENT RECOMMENDATION:
Staff recommends that the City Council ratify the above register of demands.
CITY MANAGER’S RECOMMENDATION:
Approve Department Recommendation.
_______________________
Alyssa Muto, City Manager
Attachments:
1. Check Register – Disbursement Fund
Page: 1 of 7
City of Solana Beach
Register of Demands
4/20/2024 - 5/3/2024
Department
Vendor Description Date
Check/EFT
Number Amount
100 - GENERAL FUND
MISSION SQUARE PLAN 302817 Payroll Run 1 - Warrant O22 04/25/2024 9001418 $17,230.09 SOLANA BEACH FIREFIGHTERS ASSOC Payroll Run 1 - Warrant O22 04/25/2024 9001423 $900.00 DEPARTMENT OF CONSERVATION OCT-DEC 23-SMIP FEES 04/25/2024 106576 $1,358.32 DEPARTMENT OF CONSERVATION JAN-MAR 24-SMIP FEE 04/25/2024 106576 $1,931.42 CALPERS O21 PERS 04/12/24 PD (04/22/24 PERS) 04/22/2024 9042224 $65,266.57 CALPERS O22 457 CONTRIBUTION 04/25/2024 911032294 $2,350.40 CALPERS O22 PERS 04/26/24 PD (05/02/24 PERS) 05/02/2024 9050224 $65,846.29 PRE-PAID LEGAL SERVICES, INC APR 24 - PPD LEGAL 05/03/2024 106619 $25.90 AFLAC APRIL 24 05/03/2024 106595 $1,005.18
DIVISION OF THE STATE ARCHITECT SB1186 FEES: 2023 QTR 4/2024 QTR1 05/03/2024 106609 $357.20 DIVISION OF THE STATE ARCHITECT SB1186 FEES: 2023 QTR 4/2024 QTR1 05/03/2024 106609 $323.60 SELF INSURED SERVICES COMPANY MAY 24- LIFE&ADD INS/SUPP LIFE INS/LTD 05/03/2024 9001430 $1,218.35 SELF INSURED SERVICES COMPANY MAY 24- LIFE&ADD INS/SUPP LIFE INS/LTD 05/03/2024 9001430 $350.75 SELF INSURED SERVICES COMPANY MAY 24- LIFE&ADD INS/SUPP LIFE INS/LTD 05/03/2024 9001430 $1,122.10 SELF INSURED SERVICES COMPANY MAY 24 05/03/2024 9001431 $2,837.80 INSTATAX O22 TAX PAYMENT 04/24/2024 990120305 $38,064.48 INSTATAX O22 TAX PAYMENT 04/24/2024 990120305 $1,252.10 INSTATAX O22 TAX PAYMENT 04/24/2024 990120305 $9,195.06 INSTATAX O22 TAX PAYMENT 04/24/2024 990120305 $15,094.97 INSTATAX O22 TAX PAYMENT 04/24/2024 990120305 $2,593.57 PAYMENTUS CORPORATION MARCH 24 04/25/2024 106586 $655.46 FIDELITY SECURITY LIFE INSURANCE COMPANY MAY 24-VISION 05/03/2024 106611 $497.12 IAFF-MERP APR 24 FF TRUST PAYMENT 05/03/2024 9001436 $4,975.00 MEHRNAZ DAVOUDI RFND-SB0646911/SB0646914/SB0646917/SB0646918 05/03/2024 106615 $1,432.00 TOTAL GENERAL FUND $235,883.73
1005100 - CITY COUNCIL
US BANK CLOSED SESSION 05/03/2024 106601 $180.22
US BANK CLOSED SESSION 05/03/2024 106601 $187.66
TOTAL CITY COUNCIL $367.88
1005150 - CITY CLERK
US BANK TRASH BAGS 05/03/2024 106601 $84.34
US BANK IIMC CONFERENCE TRAVEL 05/03/2024 106601 $301.48 US BANK ELECTION MATERIALS 05/03/2024 106601 $299.64
US BANK STORAGE BAGS 05/03/2024 106601 $23.72
US BANK EMAIL ENCRYPTION 05/03/2024 106601 $57.50
US BANK CCAC CONFERENCE REGISTRATION 05/03/2024 106601 $650.00 US BANK MINUTES 05/03/2024 106601 $50.25
CORODATA RECORDS MANAGEMENT, INC MAR 24-STORAGE/SHREDDING 04/25/2024 106574 $1,070.92 KFORCE INC. TEMP SERVICES-02/29/24-CLK 04/25/2024 9001419 $500.00 KFORCE INC. TEMP SERVICES-04/04/24-CLK 04/25/2024 9001419 $640.00 KFORCE INC. TEMP SERVICES-04/11/24-CLK 04/25/2024 9001419 $280.00 TOTAL CITY CLERK $3,957.85
Page: 2 of 7
1005200 - CITY MANAGER
US BANK CARDS FOR STAFF 05/03/2024 106601 $51.28
US BANK TONER 05/03/2024 106601 $103.19
US BANK OFFICE SUPPLIES 05/03/2024 106601 $30.44
US BANK BUSINESS CARDS 05/03/2024 106601 $47.83
EMANUELS JONES AND ASSOCIATES DEC 23-LOBBYING CONSULTING SERVICES 04/24/2024 9001413 $518.40 CARRIER JOHNSON FEB 24-PARKING STUDY 04/25/2024 106572 $1,645.00 TOTAL CITY MANAGER $2,396.14
1005250 - LEGAL SERVICES
BEST BEST & KRIEGER LLP NOV 23-ELECTIONS COUNSEL SRVC 05/03/2024 106598 $442.50 TOTAL LEGAL SERVICES $442.50
1005300 - FINANCE
WILLDAN MAR 24- FEE STUDY & COST ALLOCATION PLAN 04/25/2024 9001425 $475.00 HDL COREN & CONE APR-JUN 24-CONTRACT SRVC PROPERTY TAX 05/03/2024 9001434 $3,747.50 AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-ADHESIVE DESK DRAWER TRAY 04/25/2024 9001415 $29.34 DAVIS FARR, LLP FY 23-34-ANNUAL AUDIT SERVICES 05/03/2024 106606 $7,400.00 CALIFORNIA BOARD OF ACCOUNTANCY CPA EXAM APPLICATION FEE 05/03/2024 106602 $100.00 TOTAL FINANCE $11,751.84
1005350 - SUPPORT SERVICES
STAPLES CONTRACT & COMMERCIAL PAPER 05/03/2024 106623 $450.17 STAPLES CONTRACT & COMMERCIAL AIR DUSTER/PENS/DESK CALENDAR 04/25/2024 106589 $51.51 STAPLES CONTRACT & COMMERCIAL PAPER 04/25/2024 106589 $297.38 AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-PAPER
PLATES/BOWLS/FORKS/SPOONS
04/25/2024 9001415 $163.17
AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-SIGN HOLDERS 04/25/2024 9001415 $39.65 AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-COFFEE CREAMER/PODS/SUGAR 04/25/2024 9001415 $121.39 TOTAL SUPPORT SERVICES $1,123.27
1005400 - HUMAN RESOURCES
DEPARTMENT OF JUSTICE MAR 24-FINGERPRINT APP 04/25/2024 106577 $192.00 US BANK STAR AWARD 05/03/2024 106601 $138.42
US BANK COUNCIL SNACKS 05/03/2024 106601 $231.36
ALTA LANGUAGE SERVICES, INC LANGUAGE TEST 05/03/2024 9001428 $68.00 TOTAL HUMAN RESOURCES $629.78
1005450 - INFORMATION SERVICES
COX COMMUNICATIONS INC 0013410039730701-04/19/24-05/18/24 05/03/2024 106604 $321.49 US BANK CONSTANT CONTACT 05/03/2024 106601 $86.00
US BANK CD CASES/SCREEN PROTECTORS/BATTERIES/LAPTOP
CAS
05/03/2024 106601 $359.00
US BANK COMPUTER SPEAKERS 05/03/2024 106601 $105.24
US BANK FS PHONE EQUIPMENT 05/03/2024 106601 $359.72
AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-HOTLINE AUTO DIALER 04/25/2024 9001415 $65.13 AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-PHONE MOUNT/PLUG
CONNECTOR
04/25/2024 9001415 $34.68
AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-KEYBOARD 04/25/2024 9001415 $190.25 AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-LINEMANS TEST SET 04/25/2024 9001415 $119.20 AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-CABNT/PWR SRTP/ETHERNET SWITCH
04/25/2024 9001415 $387.31
TOTAL INFORMATION SERVICES $2,028.02
1005550 - PLANNING
OFFICE DEPOT INC FOLDERS/PENS/PRESSBOARD 05/03/2024 106618 $113.46 CENTRAL SQUARE TRAKIT - ANNUAL MAINT 07/01/23-06/30/24 04/25/2024 106573 $28,570.17 Page: 3 of 7
TOTAL PLANNING $28,683.63
1005590 - CODE ENFORCEMENT
VERIZON WIRELESS-SD 442224168 - 02/24/24-03/23/24 04/25/2024 106592 $139.01 DATATICKET INC. MAR 24-PARKING CITATION SERVICES 05/03/2024 106605 $724.71 DATATICKET INC. MAR 23-PARKING CITATION SERVICES 05/03/2024 106605 $1,120.80 US BANK OFFICE SUPPLIES 05/03/2024 106601 $123.82
US BANK WIPER FLUID 05/03/2024 106601 $6.51
DIAMOND MMP, INC. PARKING CITATION NOTICE 04/25/2024 9001420 $2,336.29 TOTAL CODE ENFORCEMENT $4,451.14
1006110 - LAW ENFORCEMENT
SAN DIEGO COUNTY SHERIFF'S DEPT. MAR 24-LAW ENFORCEMENT 05/03/2024 106621 $400,004.51 TOTAL LAW ENFORCEMENT $400,004.51
1006120 - FIRE DEPARTMENT
L. N. CURTIS & SONS INC PULLEYS/BELT/DUFFEL BAG/PAD/RAPPEL 04/25/2024 106583 $1,263.79 NAPA AUTO PARTS INC DEISEL EXHAUST FLUID 04/25/2024 106585 $64.59 NAPA AUTO PARTS INC TIRE WET FOAM/DETAIL SPRAY/WAX POLISH 04/25/2024 106585 $133.50 REGIONAL COMMS SYS, MS 056 - RCS MAR 24- SHERIFF RADIOS 04/25/2024 106587 $769.50 REGIONAL COMMS SYS, MS 056 - RCS MAR 24-FIRE RADIOS 04/25/2024 106587 $1,368.00 REGIONAL COMMS SYS, MS 056 - RCS MAR 24-CAP CODE 04/25/2024 106587 $32.50 ALLSTAR FIRE EQUIPMENT, INC REDZONE PARTICULATE BLOCKING HOOD 04/25/2024 106570 $1,267.93 US BANK TONER - FS 05/03/2024 106601 $27.67
US BANK FS SUPPLIES 05/03/2024 106601 $425.74
US BANK FS SUPPLIES 05/03/2024 106601 $36.96
US BANK FS SUPPLIES 05/03/2024 106601 $105.05
US BANK FS BATTERIES 05/03/2024 106601 $276.34
US BANK FS VACUUM 05/03/2024 106601 $217.49
US BANK FLOOD LIGHT 05/03/2024 106601 $638.30
US BANK MAILBOX PEDESTAL 05/03/2024 106601 $130.50
US BANK CONNECTOR KIT 05/03/2024 106601 $65.24
US BANK F150 BRAKE REPAIR 05/03/2024 106601 $1,069.63
US BANK TIP LIGHT 05/03/2024 106601 $638.30
ACE UNIFORMS LLC BOOTS 05/03/2024 9001426 $357.21
ACE UNIFORMS LLC HATS/PATCHES 05/03/2024 9001426 $1,161.11 ACE UNIFORMS LLC ALTERATIONS 04/25/2024 9001414 $122.32 ACE UNIFORMS LLC PATCH/SEWING 04/25/2024 9001414 $212.20 KATIE STRICKLAND REIMB-ICC FIRE INSPECTOR 1-02/12/24-02/29/24 05/03/2024 106613 $230.00 SOUTHERN CALIFORNIA FIRE PREVENTION STATUTES AND REGULATIONS 04/25/2024 106588 $300.00 TOTAL FIRE DEPARTMENT $10,913.87
1006130 - ANIMAL CONTROL
HABITAT PROTECTION, INC APR 24- DEAD ANIMAL REMOVAL 04/25/2024 9001417 $45.00 HABITAT PROTECTION, INC APR 24- DEAD ANIMAL REMOVAL 05/03/2024 9001433 $145.00 TOTAL ANIMAL CONTROL $190.00
1006170 - MARINE SAFETY
US BANK HARDWARE FOR SIGNAGE 05/03/2024 106601 $18.12
US BANK TRAINING SUPPLIES 05/03/2024 106601 $24.88
US BANK ROPES 05/03/2024 106601 $206.32
US BANK PICTURE FRAME 05/03/2024 106601 $40.19
CULLIGAN OF SAN DIEGO APR 24- WATER-MS 04/25/2024 106575 $56.89 WASHED OUT PRESSURE WASHING CLEANING LIFEGUARD TOWERS 05/03/2024 106626 $1,116.00 TOTAL MARINE SAFETY $1,462.40
Page: 4 of 7
1006510 - ENGINEERING
VERIZON WIRELESS-SD 362455526 - 03/02/24-04/01/24 04/25/2024 106592 $53.17 US BANK ARCGIS LOGIN (IT) 05/03/2024 106601 $58.16
US BANK APWA LUNCH MEETING 05/03/2024 106601 $45.00
MOHAMMAD SAMMAK REIMB-ENGINEER LUNCHEON 05/03/2024 106617 $19.20 ARIA ASGHARZADEH REIMB-FISH & WILDLIFE ADMIN FEE 05/03/2024 106596 $52.50 TOTAL ENGINEERING $228.03
1006520 - ENVIRONMENTAL SERVICES
VERIZON WIRELESS-SD 362455526 - 03/02/24-04/01/24 04/25/2024 106592 $53.17 MISSION LINEN & UNIFORM INC UNIFORM SERVICES FOR PUBLIC WORKS 05/03/2024 106616 $14.82 MISSION LINEN & UNIFORM INC UNIFORM SERVICES FOR PUBLIC WORKS 04/25/2024 106584 $14.81 DOG WASTE DEPOT DOG WASTE BAGS 04/25/2024 106579 $140.05 DOG WASTE DEPOT DOG WASTE BAGS 04/25/2024 106579 $2,415.55 TOTAL ENVIRONMENTAL SERVICES $2,638.40
1006530 - STREET MAINTENANCE
VERIZON WIRELESS-SD 362455526 - 03/02/24-04/01/24 04/25/2024 106592 $53.17 MISSION LINEN & UNIFORM INC UNIFORM SERVICES FOR PUBLIC WORKS 05/03/2024 106616 $24.06 MISSION LINEN & UNIFORM INC UNIFORM SERVICES FOR PUBLIC WORKS 04/25/2024 106584 $24.07 DIXIELINE LUMBER CO INC GLOVES/UTILITY KNIFE 04/25/2024 106578 $90.97 DIXIELINE LUMBER CO INC SCISSORS/SCRAPER/TRASH CAN 05/03/2024 106610 $167.98 DIXIELINE LUMBER CO INC TRASH CANS/PUSH BROOM HEAD 05/03/2024 106610 $195.39 DIXIELINE LUMBER CO INC GLOVES 05/03/2024 106610 $62.60 DIXIELINE LUMBER CO INC PAINT ROLLER/CUTOFF WHEEL/DIAMOND BLADE 05/03/2024 106610 $73.31 SDG&E CO INC 02/07/24-04/05/24-UTILITIES 05/03/2024 106622 ($59.65) SDG&E CO INC 03/07/24-04/05/24-UTILITIES 05/03/2024 106622 $544.20 BOOT WORLD, INC. BOOTS 05/03/2024 106599 $193.91
WEST COAST ARBORISTS, INC. 03/19/24-03/22/24- CITY-WIDE TREE MAINTENANC 05/03/2024 106627 $3,500.00 US BANK PLASTIC SHED 05/03/2024 106601 $1,184.17
US BANK WHITEWATER BOULDER 05/03/2024 106601 $134.30
BILL SMITH FOREIGN CAR SERVICE INC STARTER REPLACE 04/25/2024 106571 $402.08 BILL SMITH FOREIGN CAR SERVICE INC OIL CHANGE/FILTER 04/25/2024 106571 $69.85 TOTAL STREET MAINTENANCE $6,660.41
1006540 - TRAFFIC SAFETY
VERIZON WIRELESS-SD 362455526 - 03/02/24-04/01/24 04/25/2024 106592 $37.98 SDG&E CO INC 02/07/24-04/05/24-UTILITIES 05/03/2024 106622 $50.42 SDG&E CO INC 03/07/24-04/05/24-UTILITIES 05/03/2024 106622 $496.50 DEPARTMENT OF TRANSPORTATION JAN-MAR 24-COST SHARE AGMT I-5 TRAFFIC SIGNAL 05/03/2024 106608 $172.06 DEPARTMENT OF TRANSPORTATION JAN-MAR 24-COST SHARE AGMT I-5 TRAFFIC SIGNAL 05/03/2024 106608 $1,320.16 ALL CITY MANAGEMENT SERVICES, INC 03/31/24-04/13/24- CROSSING GUARD SERVICES 05/03/2024 9001427 $5,946.00 TOTAL TRAFFIC SAFETY $8,023.12
1006560 - PARK MAINTENANCE
VERIZON WIRELESS-SD 362455526 - 03/02/24-04/01/24 04/25/2024 106592 $75.95 MISSION LINEN & UNIFORM INC UNIFORM SERVICES FOR PUBLIC WORKS 05/03/2024 106616 $17.59 MISSION LINEN & UNIFORM INC UNIFORM SERVICES FOR PUBLIC WORKS 04/25/2024 106584 $17.58 DIXIELINE LUMBER CO INC WIRE CONNECTOR 04/25/2024 106578 $8.79 DIXIELINE LUMBER CO INC GLOVES 05/03/2024 106610 $23.47 DIXIELINE LUMBER CO INC LAMP/OUTLET ADAPTER 05/03/2024 106610 $39.89 DIXIELINE LUMBER CO INC FIBERGLASS FILLER 05/03/2024 106610 $24.46 DIXIELINE LUMBER CO INC PLIERS/SCREWS 05/03/2024 106610 $16.62 DIXIELINE LUMBER CO INC SCREWS 05/03/2024 106610 $15.25 DIXIELINE LUMBER CO INC SIGNS 05/03/2024 106610 $25.43
Page: 5 of 7
RANCHO SANTA FE SECURITY SYS INC MAY 24-ALARM MONITORING 05/03/2024 106620 $331.20 US BANK PAINT 05/03/2024 106601 $30.79
AA FARNSWORTH'S BACKFLOW SERVICES ANNUAL BACKFLOW TEST 05/03/2024 106594 $713.75 EMBROIDERY IMAGE POLO-PW 04/25/2024 106580 $114.75
BILL SMITH FOREIGN CAR SERVICE INC TRANSMISSION/FLYWHEEL ASSB/OIL SEAL 04/25/2024 106571 $1,280.76 THE HOME DEPOT PRO BLEACH/LINERS 04/25/2024 106591 $590.35 TOTAL PARK MAINTENANCE $3,326.63
1006570 - PUBLIC FACILITIES
DIXIELINE LUMBER CO INC PAINT ROLLER/PAINT BRUSH 04/25/2024 106578 $20.52 DIXIELINE LUMBER CO INC LIGHT SOCKET/BIT TIP HOLDER 05/03/2024 106610 $40.39 DIXIELINE LUMBER CO INC PLUMBING TEST 05/03/2024 106610 $6.16 SDG&E CO INC 02/07/24-04/05/24-UTILITIES 05/03/2024 106622 $1,721.72 SDG&E CO INC 03/07/24-04/05/24-UTILITIES 05/03/2024 106622 $5,832.22 US BANK VENTILATION FAN 05/03/2024 106601 $96.79
US BANK FLOOR MATS FOR CHEVY COLORADO 05/03/2024 106601 $96.89 US BANK BATHROOM FAN 05/03/2024 106601 $10.88
US BANK ADJUSTABLE TWIST HOSE NOZZLE 05/03/2024 106601 $15.21 US BANK LED LIGHTS 05/03/2024 106601 $273.56
US BANK BATHROOM FAUCET 05/03/2024 106601 $254.29
LALLEY CONSTRUCTION AS-NEEDED REPAIR-OUTDOOR SHWR/DOOR 05/03/2024 106614 $455.00 LALLEY CONSTRUCTION ON-CALL AS-NEEDED REPAIR SERVI 05/03/2024 106614 $845.00 SYMONS FIRE PROTECTION 2 QTR- FIRE SUPRESSION EQUIPMENT INSPECTION 05/03/2024 106624 $1,110.00 SYMONS FIRE PROTECTION Q1- FIRE SUPRESSION EQUIPMENT 04/25/2024 106590 $1,110.00 CINTAS CORPORATION NO. 2 FIRST AID SUPPLIES-PW 05/03/2024 106603 $81.55 HABITAT PROTECTION, INC APR-24- BEE/WASP REMOVAL 05/03/2024 9001433 $1,495.00 TOTAL PUBLIC FACILITIES $13,465.18
1007100 - COMMUNITY SERVICES
BAKER IRON WORKS INC SCULPTURES/MOUNTING 05/03/2024 106597 $4,893.75 STAPLES CONTRACT & COMMERCIAL AIR DUSTER/PENS/DESK CALENDAR 04/25/2024 106589 $7.06 US BANK CITY-COUNTY COM & MARK ASSOC 05/03/2024 106601 $400.00 TOTAL COMMUNITY SERVICES $5,300.81
1007110 - GF-RECREATION
US BANK LITTLE LIBRARY SIGN FOR LC 05/03/2024 106601 $54.94 US BANK TAPE AND ZIP TIES 05/03/2024 106601 $39.09
EMBROIDERY IMAGE STAFF UNIFORMS-PARK & REC 04/25/2024 106580 $509.38 BUSINESS OFFICE OUTFITTERS RECREATION DEPARTMENT FURNITURE 05/03/2024 106600 $3,366.11 TOTAL GF-RECREATION $3,969.52
1205460 - SELF INSURANCE RETENTION
US BANK PARMA HOTEL 05/03/2024 106601 $915.48
GEORGE HILLS COMPANY, INC. GL CLAIMS SERVICES 05/03/2024 9001432 $756.90 TOTAL SELF INSURANCE RETENTION $1,672.38
1355450 - ASSET REPLACEMENT-INFO SYS
DELL MARKETING L.P. LAPTOP 05/03/2024 106607 $2,262.69
TOTAL ASSET REPLACEMENT-INFO SYS $2,262.69
1356120 - ASSET REPLACEMENT-FIRE
FIRE STATION OUTFITTERS LLC RECLINERS-FS 04/25/2024 106581 $1,903.13 TOTAL ASSET REPLACEMENT-FIRE $1,903.13
1356170 - ASSET REPLACEMENT-MARN SFTY
US BANK PAINT FOR DIVE TRAILER 05/03/2024 106601 $57.25 TOTAL ASSET REPLACEMENT-MARN SFTY $57.25
Page: 6 of 7
1605360 - OPEB OBLIGATION
MIDAMERICA MAY 24 05/03/2024 9001435 $8,225.00
TOTAL OPEB OBLIGATION $8,225.00
2037510 - HIGHWAY 101 LANDSC #33
SDG&E CO INC 03/07/24-04/05/24-UTILITIES 05/03/2024 106622 $2,633.18 TOTAL HIGHWAY 101 LANDSC #33 $2,633.18
2117600 - STREET LIGHTING DISTRICT
VERIZON WIRELESS-SD 362455526 - 03/02/24-04/01/24 04/25/2024 106592 $15.19 SDG&E CO INC 02/07/24-04/05/24-UTILITIES 05/03/2024 106622 $9,245.93 TOTAL STREET LIGHTING DISTRICT $9,261.12
2135550 - DEVELOPER PASS-THRU- PLANNING
PAMELA ELLIOTT LANDSCAPE ARCHITECT MARCH 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT MARCH 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT MARCH 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT MARCH 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT MARCH 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT MARCH 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT MARCH 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT MARCH 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT MARCH 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT MARCH 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT APRIL 2024 04/25/2024 9001421 $350.00 PAMELA ELLIOTT LANDSCAPE ARCHITECT APRIL 2024 04/25/2024 9001421 $350.00 CONSTRUCTION TESTING & ENGINEERING, INC. GEOTECHNICAL REVIEW FOR THE LAS BRISAS TE23-002 04/25/2024 9001424 $610.00 TOTAL DEVELOPER PASS-THRU- PLANNING $4,810.00
2146120 - FIRE MITIGATION FEES
LINEGEAR FIRE & RESCUE EQUIPMENT JACKETS/PANTS 04/25/2024 106582 $2,533.62 TOTAL FIRE MITIGATION FEES $2,533.62
2196110 - COPS PROGRAM
SAN DIEGO COUNTY SHERIFF'S DEPT. MAR 24-LAW ENFORCEMENT 05/03/2024 106621 $12,051.99 TOTAL COPS PROGRAM $12,051.99
2505570 - COASTAL BUSINESS/VISITORS
US BANK EGG HUNT COLORING POSTER 05/03/2024 106601 $75.00 US BANK EGG HUNT SUPPLIES 05/03/2024 106601 $77.43
US BANK EGG HUNT SUPPLIES 05/03/2024 106601 $135.22
US BANK EGG HUNT SUPPLIES 05/03/2024 106601 $213.87
US BANK EGG HUNT SUPPLIES 05/03/2024 106601 $171.89
US BANK EGG HUNT SUPPLIES 05/03/2024 106601 $233.73
TOTAL COASTAL BUSINESS/VISITORS $907.14
2556180 - CAMP PROGRAMS
US BANK SCHEDULING PROGRAM 05/03/2024 106601 $12.00
TOTAL CAMP PROGRAMS $12.00
2706120 - PUBLIC SAFETY- FIRE
US BANK LED POWER SUPPLY/MDC NCDJPA 05/03/2024 106601 $130.24 US BANK MDC SUPPLIES 05/03/2024 106601 $159.37
US BANK FIRE IPAD PROTECTIVE CASES/MDC NCDJPA 05/03/2024 106601 $1,744.73 GAETKE MEDICAL CORPORATION FIRE EMPLOYEE PHYSICALS (10/13/2023) 05/03/2024 106612 $10,000.00 TOTAL PUBLIC SAFETY- FIRE $12,034.34
2706170 - PUBLIC SAFETY- MARINE SAFETY
US BANK CSA.17 SHARPS CONTAINER 05/03/2024 106601 $19.32 Page: 7 of 7
TOTAL PUBLIC SAFETY- MARINE SAFETY $19.32
459 - MISC. CAPITAL PROJECTS
QUALITY CONSTRUCTION & ENGINEERING, INC. 9362.23 FY23 PAVEMENT MAINTENCE 04/25/2024 106593 ($1,236.65) TOTAL MISC. CAPITAL PROJECTS ($1,236.65)
4595450 - MISC.CAPITALPROJECTS-IS
US BANK 9408.00 COUNCIL CHAMBER UPGRADES 05/03/2024 106601 $945.86 AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-SMART TV 04/25/2024 9001415 $982.56 AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-HDMI CABLE/DISPLAY PORT 04/25/2024 9001415 $63.06 AMAZON.COM SALES, INC INV:13PP-HXDF-XJFC-TOUCH SCREEN MONITOR 04/25/2024 9001415 $276.85 TOTAL MISC.CAPITALPROJECTS-IS $2,268.33
4596510 - MISC.CAPITALPROJECTS-ENG
UT SAN DIEGO - NRTH COUNTY NTC-BID NO:2024-04 05/03/2024 106625 $785.95 QUALITY CONSTRUCTION & ENGINEERING, INC. 9362.23 FY23 PAVEMENT MAINT CO 04/25/2024 106593 $21,229.34 QUALITY CONSTRUCTION & ENGINEERING, INC. 9362.23 FY23 PAVEMENT MAINTENA 04/25/2024 106593 $3,503.66 TOTAL MISC.CAPITALPROJECTS-ENG $25,518.95
5097700 - SANITATION
VERIZON WIRELESS-SD 362455526 - 03/02/24-04/01/24 04/25/2024 106592 $15.19 MISSION LINEN & UNIFORM INC UNIFORM SERVICES FOR PUBLIC WORKS 05/03/2024 106616 $9.25 MISSION LINEN & UNIFORM INC UNIFORM SERVICES FOR PUBLIC WORKS 04/25/2024 106584 $9.26 TOTAL SANITATION $33.70
6527820 - SUCCESSOR AGENCY
COMPUTERSHARE CORPORATE TRUST INTREST/PRINCIPAL 2017 BOND-06/01 04/25/2024 9001416 $33,099.36 COMPUTERSHARE CORPORATE TRUST INTREST/PRINCIPAL 2017 BOND-06/01 04/25/2024 9001416 $67,800.00 COMPUTERSHARE CORPORATE TRUST INTREST/PRINCIPAL 2017 BOND-06/01 04/25/2024 9001416 ($104.32) TOTAL SUCCESSOR AGENCY $100,795.04
REPORT TOTAL: $933,661.19
COUNCIL ACTION:
______________________________________________________________________ ______________________________________________________________________ AGENDA ITEM # A.3.
STAFF REPORT
CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: May 22, 2024
ORIGINATING DEPT: Finance
SUBJECT: Report on Changes Made to the General Fund Adopted Budget for Fiscal Year 2023-24
BACKGROUND:
Staff provides a report at each Council meeting that lists changes made to the current Fiscal Year (FY) General Fund Adopted Budget. The information provided in this Staff Report lists the changes made through May 8, 2024.
DISCUSSION:
The following table reports the revenues, expenditures, and transfers for 1) the Adopted General Fund Budget approved by Council on June 28, 2023 (Resolution 2023-089), 2) prior year purchase order carryover adjustments, and 3) any resolutions passed by Council that amended the Adopted General Fund Budget.
Date Action Description Revenues Expenditures Transfers from GF Net Surplus 06/28/2023 Reso 2023-089 Adopted Budget 24,472,918 (23,078,124) (980,000) $ 414,794 07/01/2023 System Generated FY 2023 GF PO Carryover (19,590) 395,204 09/27/2023 Reso 2023-113 Ord 531 Training/Diversion Program (10,000) 385,204 11/29/2023 Reso 2023-128 Engineering Survey Services (100,000) 285,204 03/13/2024 Reso 2024-027 STC Traffic Inc (Pedestrian Crossing) (20,000) 265,204 03/27/2024 Reso 2024-015 La Colonia Master Plan Update (70,000) 195,204 04/10/2024 Reso 2024-039 Mid-Year Adjustments for FY 2024 702,072 (21,229) 876,047 876,047
Date Action Description Revenues Expenditures Transfers from GF Net Surplus 06/28/2023 Reso 2023-089 Adopted Budget 4,400,000 (1,124,000) (733,400) $ 2,542,600 04/10/2024 Reso 2024-039 Mid-Year Adjustments for FY 2024 200,000 2,742,600 2,742,600
Combined General Fund Net Surplus $ 3,618,647
GENERAL FUND - ADOPTED BUDGET PLUS CHANGES
As of 05/08/2024
General Fund - Operations
General Fund - Measure S
May 22, 2024
General Fund Budget Changes - FY 2024
CEQA COMPLIANCE STATEMENT:
Not a project as defined by CEQA.
FISCAL IMPACT:
N/A
WORK PLAN:
N/A
OPTIONS:
∙ Receive the report.
∙ Do not accept the report.
DEPARTMENT RECOMMENDATION:
Staff recommends that the City Council receive the report listing changes made to the FY 2023-2024 General Fund Adopted Budget.
CITY MANAGER’S RECOMMENDATION:
Approve Department Recommendation
________________________________
Alyssa Muto, City Manager
CITY COUNCIL ACTION:
______________________________________________________________________ ______________________________________________________________________ AGENDA ITEM # A.4.
STAFF REPORT
CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: May 22, 2024
ORIGINATING DEPT: Engineering Department
SUBJECT: City Council Consideration of Resolutions 2024-046, 2024- 047 and 2024-048 Approving the Preliminary Coastal Rail Trail Engineer’s Report for Fiscal Year 2024/25 and the Annual Levy and Collection of Assessments for the Solana Beach Coastal Rail Trail Maintenance District
BACKGROUND:
In 2006, the City Council adopted a resolution forming the Solana Beach Coastal Rail Trail Maintenance District (District) under the provisions of the Landscape and Lighting Act of 1972, Division 15, Part 2, of the California Streets and Highways Code (1972 Act). The District was formed for the purpose of levying and collecting funds for the operation, maintenance, and servicing of landscaping, lighting and all appurtenant facilities related to the Coastal Rail Trail (CRT). In order to levy and collect an assessment in the District, it is necessary to notify the property owners of the City and conduct a Public Hearing. Staff is recommending the public hearing be held on June 12, 2024.
This item is presented to the City Council for the consideration of Resolution 2024-046 (Attachment 1) initiating proceedings for the District for Fiscal Year (FY) 2024/25, Resolution 2024-047 (Attachment 2) approving the Preliminary Engineer’s Report and Resolution 2024-048 (Attachment 3) setting a time and place for a Public Hearing.
DISCUSSION:
The District’s major costs are for ongoing maintenance of the CRT. The maintenance items include landscaping, irrigation, trail maintenance and graffiti removal. The costs also include the utility charges for water use along the CRT. The District includes funds for capital replacement as well including future replacement of landscaping, irrigation, pedestrian/bike path and hardscape items. The capital replacement costs also include an operating reserve of approximately 10% of the direct maintenance costs.
May 22, 2024
CRT Maintenance District for FY 2024/25
The District’s assessment methodology uses an Equivalent Benefit Unit (EBU) System.
The EBU method of apportioning benefit is typically viewed as the most appropriate and equitable assessment methodology for districts formed under the 1972 Act. The EBU for the proposed District establishes the single-family detached residential unit as the basic unit, representing 1.0 EBU. The following summarizes the EBU application by land use:
Land Use EBU
Single-Family Residential 1.0 per parcel
Residential Condominium 1.0 per dwelling unit
Multi-Family Residential 0.75 per dwelling unit
Planned Residential Development 1.0 per proposed unit
Commercial/Industrial 1.0 per parcel
Vacant Single-Family Residential 1.0 per parcel
Vacant Multi-Family Residential 0.75 per parcel
Vacant Commercial/Industrial 1.0 per parcel
The methodology identifies parcels that are exempt from the proposed District. They include, but are not limited to, parcels identified as public streets, roadways, dedicated public easements, open space and rights-of-way. These properties, as well as other publicly owned properties such as schools, fire stations, post offices and community centers are considered to receive little or no benefit from the improvements of the proposed District.
In addition to assigning properties an EBU by land type, the assessment methodology utilizes three zones based on the proximity of parcels to the CRT. Properties located closest to the CRT will receive a greater special benefit than those properties that are located further away from the trail. A factor is applied to each of the zones according to their locations. The three zones are as follows:
Zone 1:
This zone includes all properties generally located within a few blocks and closest to the CRT. The properties are located between the east side of Acacia Avenue, the east side of South Sierra Avenue and the west side of Rios Avenue (see the assessment boundary map in the Engineer’s Report). Parcels in this zone are assessed the EBU amounts based on land use and then multiplied by a factor of three.
Zone 2:
This zone includes all properties that are generally located on the west side of Acacia Avenue, the west side of South Sierra Avenue and those properties located between the east side of Rios Avenue and west of Interstate 5. Parcels in this zone are assessed the EBU amounts based on land use and then multiplied by a factor of two.
May 22, 2024
CRT Maintenance District for FY 2024/25
Zone 3:
This zone includes properties located east of Interstate 5. Parcels in this zone are assessed the EBU amounts based on land use and then multiplied by a factor of 0.5.
At the formation of the District, the adopted Maximum Assessment formula included an annual Consumer Price Index for All Urban Consumers (CPI-U) adjustment that is not to exceed 2.00%. This Maximum Assessment annual adjustment adopted by the initial vote is not considered an increased assessment. Since the CPI-U for 2023 was 5.51%, the increase to the EBU charge from last year is 2.00%, which is the maximum allowed. The following shows the maximum assessment rates proposed to be levied in the Fiscal Year (FY) 2024/25 by land use:
Land Use Description Per
Base
Rate
Zone 1
Base
Rate
Zone 2
Base
Rate
Zone 3
Single-Family Residential
Lot or
Parcel $25.08 $16.72 $4.18
Residential Condominium
Dwelling
Unit $25.08 $16.72 $4.18
Multi-Family Residential
Dwelling
Unit $18.82 $12.54 $3.14
Planned Residential
Development
Lot or
Dwelling
Unit $25.08 $16.72 $4.18
Commercial/Industrial Parcel $25.08 $16.72 $4.18
Vacant Single-Family
Residential Parcel $25.08 $16.72 $4.18
Vacant Multi-Family Residential Parcel $18.82 $12.54 $3.14 Vacant Commercial/Industrial Parcel $25.08 $16.72 $4.18 Timeshare Units
1 week of
ownership $ 0.00 $ 0.00 $0.00
Exempt Parcels Parcel $ 0.00 $ 0.00 $0.00
Public Owned Parcels Parcel $ 0.00 $ 0.00 $0.00
The 1972 Act requires the City Council to adopt a resolution annually directing the preparation and filing of an Annual Report and a Resolution of Intention to renew the annual assessments for the District. The resolutions declare the City Council's intention to levy and collect assessments and set the date of the public hearing at which the assessments will be levied. The law requires the assessment information to be submitted to the County by August 10th of each year.
Attachment 4 is the preliminary CRT Maintenance District Engineer's Report for FY 2024/25.
The report contains an overview of the District; a description of the services and May 22, 2024
CRT Maintenance District for FY 2024/25
improvements to be maintained; the proposed FY 2024/25 Budget; and the method of apportionment.
The City will notify the property owners about levying and collecting assessments in the Solana Beach Coastal Rail Trail Maintenance District by publishing a notice about the date of the Public Hearing (June 26, 2024) in the local paper.
CEQA COMPLIANCE STATEMENT:
Not a project as defined by CEQA.
FISCAL IMPACT:
The District began assessing a benefit charge in FY 2006/07. The CPI-U for 2023 was
5.51%. Since the maximum amount the assessment is allowed to increase each year is equal to the CPI-U but not greater than 2.00%, the assessments for FY 2024/25 are proposed to increase by 2.00% per Table 3 of the Report (and indicated on the previous page of this Staff Report). The amount of the Equivalent Benefit Unit for FY 2024/25 is $8.36. This is $0.18 more per EBU than last year’s assessment and is consistent with the approval of the District by the vote of the property owners in January 2006.
Based on the above methodology and included in the Engineer’s Report, the CRT is expected to receive $84,177 in benefit charge revenues (total assessment amount). The total amount expected to be spent on the Coastal Rail Trail in FY 2024/25 is $106,231. The shortfall of $22,054, or the difference between the amount expected to be received ($84,177) and the amount expected to be spent ($106,231), will be covered by available projected reserves in the CRT fund of $45,984 on July 1, 2024. The CRT fund should keep reserves equal to approximately 50% of the annual assessment amount. The proposed budget will reduce the CRT fund balance to approximately $23,930 by June 30, 2025. This reserve will be under the 50% recommended maximum fund balance of $42,089. In the future, additional funds will need to be appropriated from non-CRT funding sources to fully fund the maintenance of the Coastal Rail Trail and maintain the recommended operating reserves.
WORK PLAN:
Renewal of the CRT Maintenance District is consistent with the Fiscal Sustainability section of the City’s Work Plan.
OPTIONS:
• Accept the Preliminary Coastal Rail Trail Maintenance District Engineer’s Report for FY 2024/25, proceed with the annual levy of assessments and set the time and date for a public hearing to be held on June 26, 2024.
May 22, 2024
CRT Maintenance District for FY 2024/25
• Do not renew the CRT Maintenance District and fund cost for maintenance of the CRT through the General Fund.
• Provide direction.
DEPARTMENT RECOMMENDATION:
Staff recommends that the City Council:
1. Adopt Resolution 2024-046, initiating the proceedings for the annual levy of assessments within the Coastal Rail Trail Maintenance District for Fiscal Year 2024/25.
2. Adopt Resolution 2024-047, approving the Preliminary Engineer's Report for proceedings of the annual levy of assessments within Coastal Rail Trail Maintenance District.
3. Adopt Resolution 2024-048, declaring intention to provide for the annual levy and collection of assessments in Coastal Rail Trail Maintenance District and setting a time and date for a public hearing for June 26, 2024.
CITY MANAGER’S RECOMMENDATION:
Approve Department Recommendation.
_______________________
Alyssa Muto, City Manager
Attachments:
1. Resolution 2024-046, Initiating Proceedings
2. Resolution 2024-047, Approving Preliminary Engineer’s Report
3. Resolution 2024-048, Setting the Public Hearing
4. CRT Maintenance District Engineer’s Report for FY 2024/25 ATTACHMENT 1
RESOLUTION 2024-046
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SOLANA BEACH, CALIFORNIA, INITIATING
PROCEEDINGS FOR THE CITY OF SOLANA BEACH
COASTAL RAIL TRAIL MAINTENANCE DISTRICT FOR FY
2024/25 AND FOR THE ANNUAL LEVY OF ASSESSMENTS
WITHIN THE COASTAL RAIL TRAIL MAINTENANCE
DISTRICT
WHEREAS, the City Council of the City of Solana Beach, California, by previous Resolutions formed and approved the maximum annual assessment rates for the City of Solana Beach Coastal Rail Trail Maintenance District (“District”), pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2, Division 15 of the California Streets and Highways Code (commencing with sections 22500) (1972 Act); and
WHEREAS, the 1972 Act provides the City Council the authority to annually levy and collect assessments for the District on the San Diego County tax roll on behalf of the District to pay the maintenance, services, and operation of facilities and improvements related thereto; and
WHEREAS, the City has retained Koppel & Gruber Public Finance for the purpose of preparing and filing an engineer’s report (hereinafter referred to as the Engineer’s Report) with the City Clerk.
NOW, THEREFORE, the City Council of the City of Solana Beach, California, does resolve as follows:
1. That the above recitations are true and correct.
2. The City Council hereby appoints Koppel & Gruber Public Finance as the District Assessment Engineer and orders Koppel & Gruber Public Finance to prepare the Engineer’s Report concerning the District and the levy of assessments for Fiscal Year (FY) 2024/25, in accordance with Chapter 1, Article 4, beginning with Section 22565 of the Act.
That Coastal Rail Trail Maintenance District Engineer’s Report for FY 2024/25, as presented, consists of the following:
• A description of the District boundary and improvements; and • The Annual Budget (costs and expenses of services, operation and maintenance); and
• The method of apportionment for calculating the assessment for Resolution 2024-046
Initiating Proceedings for the CRT Maintenance District
each of the assessed parcels, lots and subdivisions of land for the property located within the CRT Maintenance District in proportion to the special benefits received and a roll containing the proposed levy amount for each assessed parcel within the CRT Maintenance District for FY 2024/25; and
• An exhibit showing the boundaries of the District.
Upon completion of the Engineer’s Report, said Report shall be filed with the City Clerk, who shall submit the same to the City Council for its consideration pursuant to Section 22586 of the Act.
3. The proposed improvements for the District include, but are not limited to:
the ongoing maintenance, operation and servicing of landscaping and public lighting improvements that were installed as part of the construction of the City’s Coastal Rail Trail. These improvements may also include all materials, equipment, utilities, labor, and appurtenant facilities related to those improvements. The Engineer’s Report describes in more detail the items to be maintained and serviced.
4. The City Council hereby determines that to provide the improvements described in Section 3 of this resolution, it is necessary to levy and collect assessments against lots and parcels within the District.
5. The City Manager of the City of Solana Beach is hereby authorized and directed to take any and all action necessary and appropriate in connection with the annual levy and collection of assessments for the District.
PASSED AND ADOPTED this 22nd day of May 2024, at a Regular Meeting of the City Council of the City of Solana Beach, California by the following vote:
AYES: Councilmembers –
NOES: Councilmembers –
ABSTAIN: Councilmembers –
ABSENT: Councilmembers –
______________________________
LESA HEEBNER, Mayor
APPROVED AS TO FORM: ATTEST:
_____________________________ _______________________________ JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk ATTACHMENT 2
RESOLUTION 2024-047
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SOLANA BEACH, CALIFORNIA, APPROVING THE
PRELIMINARY ENGINEER’S REPORT FOR PROCEEDINGS
FOR THE ANNUAL LEVY OF ASSESSMENTS WITHIN THE
COASTAL RAIL TRAIL MAINTENANCE DISTRICT
WHEREAS, the City Council of the City of Solana Beach, California, pursuant to the terms of the "Landscaping and Lighting Act of 1972", being Division 15, Part 2 of the Streets and Highways Code of the State of California, did, by previous Resolution, initiate proceedings and ordered the preparation of an Engineer's Report for the annual levy of assessments within a special assessment district, such special assessment district known and designated as City of Solana Beach Coastal Rail Trail Maintenance District (Maintenance District); and
WHEREAS, pursuant to Section 22586 of the Streets and Highways Code, there has now been presented to this City Council the Engineer’s Report as required by said Division 15 of the Streets and Highways Code and as previously directed by Resolution; and
WHEREAS, the City Council has carefully examined and reviewed the Preliminary Engineer’s Report as presented, and is preliminarily satisfied with the Maintenance District, each and all the budget items and documents as set forth therein and is satisfied that the proposed assessments have been spread in accordance with the benefits received from the improvements to be maintained and services, as set forth in said Engineer’s Report.
NOW, THEREFORE, the City Council of the City of Solana Beach, California, does resolve as follows:
1. That the above recitations are true and correct.
2. That the Coastal Rail Trail Maintenance District Engineer’s Report for Fiscal Year 2024/25, as presented, consists of the following:
• A description of the Maintenance District boundary and improvements; and
• The Annual Budget (costs and expenses of services, operation and maintenance); and
• The method of apportionment for calculating the assessment for each of the assessed parcels, lots, and subdivisions of land for the Resolution 2024-047
CRT Engineer’s Report for FY 2024/25
property located within the Maintenance District in proportion to the special benefits received and a roll containing the proposed levy amount for each assessed parcel within the Maintenance District for Fiscal Year 2024/25; and
• An exhibit showing the boundaries of the District.
3. That the Engineer’s Report is hereby preliminarily approved and ordered to be filed in the Office of the City Clerk as a permanent record and to remain open to public inspection.
4. That the City Clerk shall certify to the passage and adoption of this Resolution and the minutes of this meeting shall so reflect the presentation of the Engineer’s Report.
PASSED AND ADOPTED this 22nd day of May 2024, at a Regular Meeting of the City Council of the City of Solana Beach, California by the following vote:
AYES: Councilmembers –
NOES: Councilmembers –
ABSTAIN: Councilmembers –
ABSENT: Councilmembers –
______________________________
LESA HEEBNER, Mayor
APPROVED AS TO FORM: ATTEST:
_____________________________ _______________________________ JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk RESOLUTION 2024-048
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SOLANA BEACH, CALIFORNIA, DECLARING ITS
INTENTION TO PROVIDE FOR THE ANNUAL LEVY AND
COLLECTION OF ASSESSMENTS IN THE COASTAL
RAIL TRAIL MAINTENANCE DISTRICT FOR FY 2024/25
AND SETTING A TIME AND PLACE FOR A PUBLIC
HEARING THEREON
WHEREAS, the City Council of the City of Solana Beach, California, has previously formed a special assessment district pursuant to the terms of the "Landscaping and Lighting Act of 1972", being Division 15, Part 2 of the Streets and Highways Code of the State of California, such special assessment district known and designated as City of Solana Beach Coastal Rail Trail Maintenance District (the Maintenance District); and
WHEREAS, at this time, the City Council is desirous to take proceedings to provide for the annual levy of assessments for the next ensuing fiscal year to provide for costs and expenses necessary to pay for the maintenance of the improvements in said Maintenance District; and
WHEREAS, at the formation of the District, the adopted Maximum Assessment formula includes an annual Consumer Price Index for All Urban Consumers (CPI-U) adjustment not to exceed 2.00% and this annual adjustment adopted by the initial vote is not considered an increased assessment. The CPI-U for 2023 was 5.51%. Since the maximum amount the assessment is allowed to increase each year is 2.00%, the assessments per Equivalent Benefit Unit (EBU) for Fiscal Year 2024/25 are proposed to increase by 2.00%; and
WHEREAS, there has been presented and approved by this City Council the Engineer’s Report, as required by law, and this City Council is desirous of continuing with the proceedings for said annual levy by adopting this Resolution of Intent pursuant to Streets and Highways Code Section 22587.
NOW, THEREFORE, the City Council of the City of Solana Beach, California, does resolve as follows:
1. That the above recitations are true and correct.
2. The public interest and convenience require, and the City Council does propose at this time, to levy assessments for the Maintenance District to provide for the financing of the operation, maintenance and servicing of certain improvements located within the Coastal Rail Trail including both Resolution 2024-048
Set Public Hearing for the CRT Maintenance District
landscaping improvements and appurtenances and public lighting improvements and appurtenances.
The landscaping improvements and services to be maintained by the Maintenance District include, but are not limited to, landscaping, planting, ground cover, shrubbery, turf, trees, irrigation and drainage systems, hardscape, fixtures, sidewalks, fencing and other appurtenant items located along and adjacent to the City portion of the Coastal Rail Trail.
The public lighting improvements to be maintained and serviced include, but are not limited to, poles, fixtures, bulbs, conduits, conductors, equipment including guys, anchors, posts and pedestals, metering devices and appurtenant facilities as required to provide lighting along and within the Coastal Rail Trail.
3. That said works of improvement are of special benefit to the properties within the boundaries of said Maintenance District, which Maintenance District the legislative body previously declared to be the area specially benefited by said works of improvement, and for particulars, reference is made to the boundary map as previously approved by this legislative body, a copy of which is on file in the Office of the City Clerk and open for public inspection, and is designated by the name of this Maintenance District.
4. That the Engineers Report, as preliminarily approved by the legislative body, is on file with the City Clerk and open for public inspection.
Reference is made to such Engineer’s Report for a full and detailed description of the improvements to be installed and/or maintained, the boundaries of the Maintenance District, any zones therein and the proposed assessments upon assessable lots and parcels of land within the Maintenance District.
5. All costs and expenses of the works of maintenance and incidental expenses have been apportioned and distributed to the benefiting parcels in accordance with the special benefits received from the proposed work.
6. Notice is hereby given of a public hearing on the 26th day of June, 2024 at 6:00 P.M.
7. At that time, the legislative body will consider and finally determine whether to levy the proposed annual assessment, and to hear all protests relating to said proposed proceedings, or the estimate of the cost and expenses of the proposed maintenance, or the proposed annual assessment; and any and all persons interested may file a written protest at [email protected] before 12:00 p.m. of the hearing day or, having Resolution 2024-048
Set Public Hearing for the CRT Maintenance District
filed such a protest, may file a written withdrawal of that protest at [email protected] prior to 12:00 p.m. of such hearing day. Any such written protest must state all grounds for objection. A written protest by a property owner must contain a description sufficient to identify the property owned by such person, e.g. assessor’s parcel number.
Any interested person may mail a protest to the following address:
CITY CLERK
CITY OF SOLANA BEACH
635 S. HIGHWAY 101
SOLANA BEACH, CA 92075
[email protected]
To be considered by the legislative body, all protests must be received by 12:00 p.m. the public hearing date. A postmark prior to such date and time will not be sufficient.
8. That the City Clerk is hereby authorized and directed to give notice as required by law by causing a copy of the Resolution to be published in the newspaper of general circulation within said City; and publication to be completed not less than ten (10) days prior to the date set for the public hearing.
PASSED AND ADOPTED this 22nd day of May 2024, at a Regular Meeting of the City Council of the City of Solana Beach, California by the following vote:
AYES: Councilmembers –
NOES: Councilmembers –
ABSTAIN Councilmembers –
ABSENT: Councilmembers –
______________________________
LESA HEEBNER, Mayor
APPROVED AS TO FORM: ATTEST:
_____________________________ _______________________________ JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk City Of Solana Beach
Coastal Rail Trail Maintenance District
Engineer’s Report
Fiscal Year 2024/2025
Date May 8, 2024
TABLE OF CONTENTS
SECTION I. OVERVIEW ..............................................................................................1 SECTION II. PLANS AND SPECIFICATION..............................................................3 SECTION III. PROPOSED FISCAL YEAR 2024/2025 BUDGET ..................................5 A. ESTIMATED FISCAL YEAR 2024/2025 BUDGET ...............................5 B. DESCRIPTION OF BUDGET ITEMS...................................................7 SECTION IV. METHOD OF APPORTIONMENT .......................................................8 A. GENERAL ................................................................................................8 B. GENERAL BENEFIT ANALYSIS ..........................................................8 C. SPECIAL BENEFIT ANALYSIS .............................................................9 D. ASSESSMENT METHODOLOGY .......................................................10 E. RATES .....................................................................................................12 F. ASSESSMENT RANGE FORMULA.....................................................13 SECTION V. ASSESSMENT ROLL.............................................................................14 SECTION VI. ASSESSEMENT DIAGRAM ...................................................................15 City of Solana Beach Coastal Rail Trail Maintenance District Page 1 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
SECTION I. OVERVIEW
A. INTRODUCTION AND BACKGROUND
The Coastal Rail Trail (the “CRT”) is a project sponsored by the cities of Oceanside, Carlsbad, Encinitas, Solana Beach and San Diego for a multi-use pathway (bicycle facilities and pedestrian) that will ultimately extend from the San Luis Rey River in Oceanside to the Santa Fe Depot in San Diego. Each of the sponsoring cities has agreed to construct and maintain the portion of the trail that is located within their jurisdiction. The City of Solana Beach (the “City”) began construction on their portion of the CRT (“City CRT”) in August 2003 by obtaining outside grants and the City CRT was substantially completed in November of 2004.
The City CRT consists of a Class I bicycle trail that is approximately 1.7 miles long. The Solana Beach portion of the CRT starts at the south City boundary at Via de la Valle and extends north to Ocean Street near the north City boundary.
The City of Solana Beach Coastal Rail Trail Maintenance District (“District”) was formed in January 2006 in order to provide funding for the maintenance of certain public improvements including but not limited to the operation, maintenance and servicing of landscaping and public lighting improvements along the City CRT. This report constitutes the Fiscal Year 2024/2025 Engineer’s Report for the District.
The City Council pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code of California, beginning with Section 22500 (“Act”) and in compliance with the substantive and procedural requirements of the California State Constitution Article XIIIC and XIIID (“Proposition 218”) and the Proposition 218 Omnibus Implementation Act (Government Code Section 53750 and following) (the “Implementation Act”) desires to levy and collect annual assessments against lots and parcels within the District beginning in the fiscal year commencing July 1, 2024 and ending June 30, 2025 to pay for the operation, maintenance and servicing of landscaping and public lighting improvements along the City CRT. The proposed assessments are based on the City’s estimate of the costs for Fiscal Year 2024/2025 to maintain the City CRT improvements that provide a special benefit to properties assessed within the District. The assessment rates set for Fiscal Year 2024/2025 as set forth in this Engineer’s Report, do not exceed the maximum rates established at the time the District was formed, therefore, the City and the District are not required to go through a property owner ballot procedure in order to establish the 2024/2025 assessment rates.
City of Solana Beach Coastal Rail Trail Maintenance District Page 2 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
B. CONTENTS OF ENGINEER’S REPORT
This Report describes the District boundaries and the proposed improvements to be assessed to the property owners located within the District. The Report is made up of the following sections.
SECTION I. OVERVIEW – Provides a general introduction into the Report and provides background on the District and the assessment.
SECTION II. PLANS AND SPECIFICATIONS – Contains a general description of the improvements that are maintained and serviced by the District.
SECTION III. PROPOSED FISCAL YEAR 2024/2025 BUDGET – Identifies the cost of the maintenance and services to be provided by the District including incidental costs and expenses.
SECTION IV. METHOD OF APPORTIONMENT – Describes the basis in which costs have been apportioned to lots or parcels within the District, in proportion to the special benefit received by each lot or parcel.
SECTION V. ASSESSMENT ROLL – The assessment roll identifies the maximum assessment to be levied to each lot or parcel within the District.
SECTION VI. ASSESSMENT DIAGRAM – Displays a diagram of the District showing the boundaries of the District.
For this Report, each lot or parcel to be assessed, refers to an individual property assigned its own Assessment Parcel Number (“APN”) by the San Diego County (“County”) Assessor’s Office as shown on the last equalized roll of the assessor.
Following the conclusion of the Public Hearing, the City Council will confirm the Report as submitted or amended and may order the collection of assessments for Fiscal Year 2024/2025.
City of Solana Beach Coastal Rail Trail Maintenance District Page 3 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
SECTION II. PLANS AND SPECIFICATION
A. GENERAL DESCRIPTION OF THE DISTRICT
The boundaries of the District are defined as being contiguous with the boundaries of the City of Solana Beach. Solana Beach is located approximately thirty miles north of the City of San Diego in the north coastal area of the County. The City is bordered by the Pacific Ocean to the west, the City of Encinitas to the north, the City of Del Mar to the south and the County of San Diego to the east.
The properties within the District include single-family residential, multi-family residential, timeshare, commercial, and industrial parcels. Each parcel has been categorized into three zones based upon their general proximity to the City CRT. Please refer to Section IV D of the Report for a further explanation on the zones included within the District.
B. DESCRIPTION OF SERVICES AND IMPROVEMENTS TO BE MAINTAINED The District provides a funding mechanism for the ongoing maintenance, operation and servicing of landscaping and public lighting improvements that were installed as part of the construction of the City CRT. These improvements may include, but are not limited to, all materials, equipment, utilities, labor, and appurtenant facilities related to those improvements.
The improvements constructed as part of the project that are to be maintained and serviced by the District relate to landscaping and public lighting improvements, and are generally described as follows:
Concrete and decomposed granite trails including landscaping, irrigation, drainage, grading, lighting, and hardscape features.
Concrete paths, trees, plantings, lighting, irrigation, conduit, infrastructure, earthwork, trash receptacles, fencing, node structures (bus shelters, art amenities, garden nodes), drinking fountains, signage, and observation deck.
Open space and irrigated and planted slopes located along the Trail. Public lighting facilities within and adjacent to the City CRT.
Maintenance services will be provided by City personnel and/or private contractors. The proposed improvements to be maintained and services are generally described as follows:
City of Solana Beach Coastal Rail Trail Maintenance District Page 4 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
LANDSCAPING AND APPURTENANT IMPROVEMENTS
The landscaping improvements and services to be maintained by the District include but are not limited to landscaping, planting, ground cover, shrubbery, turf, trees, irrigation and drainage systems, hardscape, fixtures, sidewalks, fencing and other appurtenant items located along and adjacent to the City CRT.
PUBLIC LIGHTING AND APPURTENANT IMPROVEMENTS
The public lighting improvements to be maintained and serviced include but are not limited to the following, which provide public lighting directly or indirectly to the City CRT or to other public areas associated with or necessary for use of the trail:
Maintenance, repair and replacement of public light poles and fixtures, including changing light bulbs, painting, photoelectric cell repair or replacement, and repairing damage caused by automobile accidents, vandalism, time, and weather. Electrical conduit repair and replacement due to damage by vandalism, time and weather.
Service-call maintenance, repair and replacement including painting, replacing worn out electrical components and repairing damage due to accidents, vandalism, and weather.
Payment of the electrical bill for the existing street lighting system. Responding to constituent and business inquiries and complaints regarding the public lighting.
Maintenance means the furnishing of services and materials for the ordinary and usual maintenance, operation and servicing of landscaping and public lighting improvements facilities and appurtenant facilities. This includes repair, removal or replacement of all or part of any of the landscaping and street lighting improvements, or appurtenant facilities; providing for the life, growth, health and beauty of landscaping improvements and for the operation of the lighting improvements.
Servicing means the furnishing of all labor, materials, equipment and utilities necessary to maintain the landscaping improvements and to maintain and operate the public lighting improvements or appurtenant facilities in order to provide adequate illumination.
City of Solana Beach Coastal Rail Trail Maintenance District Page 5 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
SECTION III. PROPOSED FISCAL YEAR BUDGET
A. ESTIMATED FISCAL YEAR 2024/2025 BUDGET
A summary of the proposed District Fiscal Year 2024/2025 budget is summarized, by category, in Table 1 shown on the following page:
City of Solana Beach Coastal Rail Trail Maintenance District Page 6 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
TOTAL
BUDGET
GENERAL
BENEFIT
PORTION1&2
PROPOSED FY
2024/2025
ASSESSMENT
Operating and Maintenance
Landscape, Irrigation & Hardscape Maintenance Thru an
Outside Contract (Includes Tree Trimming) $68,500 $3,500 $65,000 Utilities (Water) $21,000 $0 $21,000
Utilities (Electricity) $29,500 $29,500 $0
Trail Maintenance (DG & Concrete Paths) $1,400 $0 $1,400 Graffiti Abatement $200 $0 $200
Advertising $700 $0 $700
Total Operating and Maintenance Costs $121,300 $33,000 $88,300 Capital Replacement
Landscape & Irrigation Replacement $3,600 $100 $3,500
Pedestrian/Bicycle Path Replacement $2,500 $0 $2,500
Hardscape Features Replacement (water fountain, art
work, bus shelter) $2,600 $100 $2,500
Reserves
Fiscal Year 2024/2025 Reserve Collection $0 $0 $0
Total Capital Replacement and Reserves $8,700 $200 $8,500 District Administration Costs
County SB 2557 Costs $598
County Electronic Data Processing Costs $602
City Administration/Consultant Costs $8,231
Total Administration Costs $9,431
TOTAL BUDGET $106,231
LESS OPERATING RESERVES USED IN FY2 ($22,054)
TOTAL ASSESSMENT AMOUNT $84,177
Total Parcels in the District 13,105
Total Parcels Levied 5,658
Total Equivalent Benefit Units 10,069.13
Proposed Levy Per Equivalent Benefit Unit $8.36
Inflation Percentage Applied to Proposed Levy Per EBU 2.00% Beginning Balance as of 7/1/24 $45,984
FY 2024/2025 Collection $84,177
Expenditures ($106,231)
Projected Ending Balance as of 6/30/253 $23,930
Maximum Recommended Cash Flow Reserve Amount $42,089
1. While the cost of the electricity is not 100% general benefit, the City is paying for the entire cost through other available funds and none of the cost is being allocated to the parcels located within the District.
2. The CRT landscaping cost is greater than the available funding from the District so other available funding is being utilized to cover the difference.
3. The City is developing a plan on how to utilize the operating reserves on the CRT in the future.
ADMINISTRATION COSTS
AMOUNT TO LEVY
OPERATING RESERVES
Table 1
CITY OF SOLANA BEACH
COASTAL RAIL TRAIL MAINTENANCE DISTRICT
2024/2025 BUDGET
OPERATING AND MAINTENANCE COSTS
CAPITAL REPLACEMENT AND RESERVES
City of Solana Beach Coastal Rail Trail Maintenance District Page 7 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
B. DESCRIPTION OF BUDGET ITEMS
The following is a brief description of the major budget categories that includes the detailed costs of maintenance and services for the District included in the table above.
OPERATING AND MAINTENANCE COSTS – This includes the costs of maintaining and servicing the landscaping and lighting improvements. This may include, but is not limited to, the costs for labor, utilities, equipment, supplies, repairs, replacements and upgrades that are required to properly maintain the items that provide a direct benefit to properties located within the District.
CAPITAL REPLACEMENT AND RESERVES – These items provide a funding source to pay for items that wear out over time, other unanticipated items not directly budgeted for and for the replacement of the landscaping, pathways and hardscape features located along and adjacent to the City CRT.
ADMINISTRATION COSTS – This includes the indirect costs not included above that are necessary to pay for administrative costs related to the District, including the levy and submittal of the assessments to the County to be placed on the Fiscal Year 2024/2025 County equalized tax roll, responding to property owner inquiries relating to the assessments and services, and any other related administrative costs.
City of Solana Beach Coastal Rail Trail Maintenance District Page 8 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
SECTION IV. METHOD OF APPORTIONMENT
A. GENERAL
The 1972 Act permits the establishment of assessment districts by agencies for the purpose of providing certain public improvements, which include the construction, maintenance, and servicing of landscaping and public lights and appurtenant facilities.
Streets and Highways Code Section 22573 requires that maintenance assessments be levied according to benefit rather than the assessed value.
“The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.”
In addition, Article XIIID and the Implementation Act require that a parcel’s assessment may not exceed the reasonable cost for the proportional special benefit conferred to that parcel. A special benefit is a particular and distinct benefit over and above general benefits conferred on property located within the assessment district. Article XIIID and the Implementation Act further provides that only special benefits are assessable and the City must separate the general benefits from the special benefits. They also require that publicly owned properties which specifically benefit from the improvements be assessed.
B. GENERAL BENEFIT ANALYSIS
The improvements described in Section II B of this Report are for the special benefit, enhancement and use of properties within the District. However, the City CRT was constructed as a portion of a much larger regional trail that eventually will extend from the City of Oceanside to the north to the City of San Diego to the south. Residents and property owners located in each of the cities along the trail will receive a special benefit from the construction and maintenance of the trail within their city. Residents from each of these cities will have an opportunity to use the entire trail upon completion including the portion in Solana Beach which creates a general benefit.
Additionally, included among the different property types in the City are timeshare units.
Though individuals may purchase and “own” their timeshare unit, their ownership rights are limited and temporary (typically one week per year.) Owners of timeshare units have an opportunity to use the CRT while vacationing in the City. Due to the limited ownership time-frame of timeshare owners, their special benefit is limited and thus considered as part of the general benefit similar to the general benefit to the public at large.
The general benefit portion of the assessment has been determined by looking at each participating city’s trail length as a factor or the entire trail. The City of Solana Beach’s portion of the CRT is 1.7 miles compared to the entire proposed trail length of 44.0 miles.
Comparing the length of the City CRT to the total length of the CRT results in a general benefit of 3.86%. Engineering also determined that timeshares add an additional 2.0% City of Solana Beach Coastal Rail Trail Maintenance District Page 9 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
general benefit impact. For rounding purposes after adding the two components (3.86% +
2.0%) the general benefit is considered to be 6.0% overall to the public at large. The budget has been allocated to parcels based on their special benefit share. In addition, the City is paying 100% of the electricity costs, totaling $29,500, for the District through funds available from other sources resulting in over 30% of the costs paid directly by the City.
C. SPECIAL BENEFIT ANALYSIS
Each of the proposed improvements and the associated costs and assessments within the District has been reviewed, identified and allocated based on special benefit pursuant to the provisions of Article XIIID, the Implementation Act, and the Streets and Highways Code Section 22573.
Proper maintenance and operation of the City CRT landscaping, hardscape, open space and public lighting provides special benefit to adjacent properties by providing community character, security, safety and vitality. Additionally, one of the purposes of the trail is to facilitate alternative transportation opportunities in order to reduce air pollution and vehicular traffic congestion which provide special benefit to the properties within the District.
TRAIL AND LANDSCAPING SPECIAL BENEFIT
Landscaping and appurtenant facilities, if well maintained, provide beautification, shade and enhancement of the desirability of the surroundings, and therefore increase property values. Specifically, they provide a sense of ownership and a common theme in the community providing aesthetic appeal, recreational and health opportunities and increased desirability of properties.
PUBLIC LIGHTING SPECIAL BENEFIT
The operation, maintenance and servicing of public lighting along and adjacent to the City CRT provide safety and security to properties along City CRT specifically as follows:
Improved security, deterrence of crime and aid to police and fire protection. Reduced vandalism and damage to the improvements and property. Increased business activity to the coastal community during nighttime hours.
City of Solana Beach Coastal Rail Trail Maintenance District Page 10 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
D. ASSESSMENT METHODOLOGY
To establish the special benefit to the individual lots or parcels within the District, an Equivalent Benefit Unit system based on land use is used along with a Zone Factor based on geographic proximity to the City CRT.
EQUIVALENT BENEFIT UNITS
Each parcel of land is assigned an Equivalent Benefit Unit in proportion to the estimated special benefit the parcel receives relative to other parcels within the District. The single family detached (“SFD”) residential property has been selected as the basic unit for calculating assessments; therefore, a SFD residential parcel equals one Equivalent Benefit Unit (“EBU”).
The EBU method of apportioning benefit is typically seen as the most appropriate and equitable assessment methodology for districts formed under the 1972 Act, as the benefit to each parcel from the improvements are apportioned as a function of land use type, size and development. A methodology has been developed to relate all other land uses to the SFD residential as described below.
EBU APPLICATION BY LAND USE:
SINGLE-FAMILY RESIDENTIAL — This land use is defined as a fully subdivided residential parcel in which a tract map has been approved and recorded. This land use is assessed 1.0 EBU per lot or parcel. This is the base value that all other land use types are compared and weighted against (i.e. Equivalent Benefit Unit or EBU).
RESIDENTIAL CONDOMINIUM — This land use is defined as a fully subdivided residential parcel that has more than one residential unit developed on the property with individual unit ownership. This land use is assessed 1.0 EBU per dwelling unit.
MULTI-FAMILY RESIDENTIAL — This land use is defined as a fully subdivided residential parcel that has more than one residential unit developed on the property not available for individual unit ownership. This land use is assessed 0.75 EBU per dwelling unit.
PLANNED-RESIDENTIAL DEVELOPMENT — This land use is defined as any property not fully subdivided with a specific number of proposed residential lots or dwelling units to be developed on the parcel. This land use type is assessed at 1.0 EBU per planned (proposed) residential lot or dwelling unit.
COMMERCIAL/INDUSTRIAL — This land use is defined as property developed for either commercial or industrial use. This land use type is assessed at 1.0 EBU per parcel.
VACANT SINGLE-FAMILY RESIDENTIAL — This land use is defined as property currently zoned for single-family detached residential development, but a tentative or final tract map has not been submitted and/or approved. This land use is assessed at 1.0 EBU per parcel.
VACANT MULTI-FAMILY RESIDENTIAL — This land use is defined as property currently zoned for multi-family residential development, but a tentative or final tract map has not been submitted and/or approved. This land use is assessed at 0.75 EBU per parcel.
City of Solana Beach Coastal Rail Trail Maintenance District Page 11 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
VACANT COMMERCIAL/INDUSTRIAL — This land use is defined as property currently zoned for either commercial or industrial use. This land use is assessed at 1.0 EBU per parcel.
EXEMPT PARCELS — This land use identifies properties that are not assessed and are assigned 0.0 EBU. This land use classification may include, but is not limited, to lots or parcels identified as public streets and other roadways (typically not assigned an APN by the County); dedicated public easements, open space areas and right-of-ways including greenbelts and parkways; utility right-of-ways; common areas, sliver parcels and bifurcated lots or any other property that can not be developed; park properties and other publicly owned properties that are part of the District improvements or that have little or no improvement value. These types of parcels are considered to receive little or no benefit from the improvements and are therefore exempted from assessment.
PUBLIC OWNED PARCELS — This land use identifies properties that are not assessed and are assigned 0.0 EBU. This land use classification includes other typically non-assessed parcels that are not considered exempt parcels and may include, but is not limited, to lots or parcels identified as schools, government owned buildings, fire and police stations, and administration offices. These types of properties are considered to receive little special benefit from the improvements and any benefit that they may receive is considered to be part of the City’s general benefit contribution to the District.
ZONE FACTOR
The District was divided into three zones based on the proximity of parcels in location to the City CRT. Properties located the closest to the trail will receive a greater special benefit as compared to those parcels the farthest away. In order to calculate this into the assessment a factor is applied to each parcel according to the following Zone location.
ZONE 1 PROPERTIES – This Zone is defined as properties located adjacent to or within a few blocks of the City CRT improvements. This includes all properties that are generally located east of Acacia and Sierra Avenue and west of Rios Avenue. Parcels located in this zone use the EBU amounts derived above based on land use and then multiplied by a proximity factor of three (3).
ZONE 2 PROPERTIES – This Zone is defined as properties located close to the improvements but not adjacent to the City CRT or properties defined as Zone 1 Properties.
This includes all properties that are generally located west of Acacia Avenue and also those properties located east of Rios Avenue and west of Interstate-5. Parcels located in this zone use the EBU amounts derived above based on land use and then multiplied by a proximity factor of two (2).
ZONE 3 PROPERTIES – This Zone is defined as properties located the furthest away from the City CRT improvements. This includes all properties that are located east of Interestate5. Parcels located in this zone use the EBU amounts derived above based on land use and then multiplied by a proximity factor of 0.5.
City of Solana Beach Coastal Rail Trail Maintenance District Page 12 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
The following table summarizes the EBU and Zone Factors based on land use.
In order to determine the maximum annual assessment rate for each type of land use described above, the following formula is applied:
Applicable EBU * Applicable Zone Factor*Maximum Assessment Rate per 1.0 EBU=Assessment Rate per Unit/Parcel.
E. RATES
Table 3 below shows the maximum assessments rates proposed to be levied in Fiscal Year 2024/2025 by land use. Because the San Diego Consumer Price Index for All Urban Consumers (“CPI-U”) was over 2.00% for 2023 (5.51%), the maximum assessments were increased by 2.00% as allowed for in the assessment range formula discussed below.
Land Use Description
Equivalent
Benefit Units
(EBUs) Per
Zone 1
Multiplier
Zone 2
Multiplier
Zone 3
Multiplier
No. of EBUs
for Property
in Zone 1
No. of EBUs
for Property
in Zone 2
No. of EBUs
for Property
in Zone 3
Single Family Residential 1.00 Lot or Parcel 3.00 2.00 0.50 3.00 2.00 0.50 Residential Condominium 1.00 Dwelling Unit 3.00 2.00 0.50 3.00 2.00 0.50 Multi-Family Residential 0.75 Dwelling Unit 3.00 2.00 0.50 2.25 1.50 0.38 Planned Residential Development 1.00
Lot or Dwelling
Unit 3.00 2.00 0.50 3.00 2.00 0.50
Commercial/Industrial 1.00 Parcel 3.00 2.00 0.50 3.00 2.00 0.50 Vacant Single Family Residential 1.00 Parcel 3.00 2.00 0.50 3.00 2.00 0.50 Vacant Multi-Family Residential 0.75 Parcel 3.00 2.00 0.50 2.25 1.50 0.38 Vacant Commercial/Industrial 1.00 Parcel 3.00 2.00 0.50 3.00 2.00 0.50 Timeshare Units 0.00
1 week of
ownership 3.00 2.00 0.50 0.00 0.00 0.00
Exempt Parcels 0.00 Parcel 3.00 2.00 0.50 0.00 0.00 0.00 Public Owned Parcels 0.00 Parcel 3.00 2.00 0.50 0.00 0.00 0.00 Table 2
CITY OF SOLANA BEACH
COASTAL RAIL TRAIL MAINTENANCE DISTRICT
EQUIVALENT BENEFIT UNITS AND ZONE FACTOR BY LAND USE
City of Solana Beach Coastal Rail Trail Maintenance District Page 13 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
F. ASSESSMENT RANGE FORMULA
The purpose of establishing an Assessment Range Formula is to provide for reasonable inflationary increases to the annual assessments without requiring the District to go through an expensive balloting process required by law in order to get a small increase. On July 1, 2007 and each year thereafter, the Maximum Assessment Rate shall be increased by the lesser of Local CPI-U in the San Diego County area or 2.0%. The CPI-U used shall be as determined annually by the Bureau of Labor Statistics beginning with the CPI-U rate increase for 2006.
Beginning in the Fiscal Year 2007/2008 the Maximum Assessment may be increased using the lesser of the increase in the CPI-U from first year levy (the Assessment Range Formula) or 2.0%. This Assessment Rate Formula would be applied every fiscal year thereafter and a new Maximum Assessment will be established to include the allowable increase.
The Maximum Assessment adjusted annually by this formula is not considered an increased assessment. Although the Maximum Assessment will increase each year, the actual assessment will only reflect the necessary budgeted amounts and may remain unchanged. Increases in the budget or an increase in the rate in one year from the prior year will not require a new 218 balloting unless the rate is greater than the Maximum Assessment adjusted to reflect an increase in the CPI-U.
Land Use Description Per
Base Rate for
Zone 1
Base Rate
for Zone 2
Base Rate
for Zone 3
Single Family Residential Lot or Parcel $25.08 $16.72 $4.18 Residential Condominium Dwelling Unit $25.08 $16.72 $4.18 Multi-Family Residential Dwelling Unit $18.82 $12.54 $3.14 Planned Residential Development
Lot or Dwelling
Unit $25.08 $16.72 $4.18
Commercial/Industrial Parcel $25.08 $16.72 $4.18
Vacant Single Family Residential Parcel $25.08 $16.72 $4.18 Vacant Multi-Family Residential Parcel $18.82 $12.54 $3.14 Vacant Commercial/Industrial Parcel $25.08 $16.72 $4.18 Timeshare Units
1 week of
ownership $0.00 $0.00 $0.00
Exempt Parcels Parcel $0.00 $0.00 $0.00
Public Owned Parcels Parcel $0.00 $0.00 $0.00
COASTAL RAIL TRAIL MAINTENANCE DISTRICT
EQUIVELANT BENEFIT UNITS AND ZONE FACTOR BY LAND USE
Table 3
CITY OF SOLANA BEACH
City of Solana Beach Coastal Rail Trail Maintenance District Page 14 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
SECTION V. ASSESSMENT ROLL
Parcel identification, for each lot or parcel within the District shall be the parcel as shown on the County Assessor's map for the year in which this Report is prepared.
A listing of parcels assessed within the District, along with the proposed assessment amounts, has been submitted to the City Clerk, under a separate cover, and by reference is made part of this Report. Said listing of parcels to be assessed shall be submitted to the County Auditor/Controller and included on the property tax roll for each parcel in Fiscal Year 2024/2025. If any parcel submitted for collection is identified by the County Auditor/Controller to be an invalid parcel number for the current fiscal year, a corrected parcel number and/or new parcel numbers will be identified and resubmitted to the County Auditor/Controller. The assessment amount to be levied and collected for the resubmitted parcel or parcels shall be based on the method of apportionment and assessment rate approved in this Report. Therefore, if a single parcel has changed to multiple parcels, the assessment amount applied to each of the new parcels shall be recalculated and applied according to the approved method of apportionment and assessment rate rather than a proportionate share of the original assessment.
City of Solana Beach Coastal Rail Trail Maintenance District Page 15 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
SECTION VI. ASSESSMENT DIAGRAM
The parcels within the District consist of all lots, parcels and subdivisions of land located in the City. A reduced copy of the boundary map of the area is attached. 900· 450• o· 900'
SCALE : 1" = 900'
KOPlPEL GRUBER PUBL I C 1-' I NAN E
334 'Via Vera Crus Suite 21111 Ban Ila-. Callfomla tlli078 PboDe ('NICI) 1110-0290 ru ('NICI) 1110-0288 (05-057) APRIL 2005
CITY OF
SAN DIEGO
SHEET 1 OF 1
FILED IN THE omcE OF THE CITY CLERK OF THE CITY OF SOLANA BEACH THIS __ DAY OF ------~ 2005.
I HEREBY CERTIFY THAT THE \\1THIN MAP SH0\\1NG PROPOSED BOUNDARIES
OF THE COASTAL RAIL TRAIL MAINTENANCE DISTRICT, CITY OF SOLANA
BEACH COUNTY OF SAN DIEGO STATE OF CALIFORNIA, WAS APPROVED BY THE CITY COUNCIL OF THE CITY OF SOLANA BEACH AT A REGULAR MEETING THEREOF, HELD ON THE ___ DAY OF ______ _ 2005, BY ITS RESOLUTION NO. ---------
CITY CLERK
CITY OF SOLANA BEACH
NOTE· FOR PARTICULARS OF THE LINES AND DIMENSIONS OF ASSESSOR'S
PARCELS, REFERENCE IS MADE TO THE MAPS OF THE SAN DIEGO COUNTY
ASSESSOR OF SAN DIEGO COUNTY RECORDS, WHICH MAPS SHALL GOVERN FOR ALL DETAILS RELATING THERETO.
PROPOSED BOUNDARY MAP OF
COASTAL RAIL TRAIL MAINTENANCE DISTRICT
CITY OF SOLANA BEACH
COUNTY OF SAN DIEGO
STATE OF CALIFORNIA
City of Solana Beach Coastal Rail Trail Maintenance District Page 16 Fiscal Year 2024/2025 Engineer’s Report 4/19/2024
CITY OF SOLANA BEACH
CITY OF SOLANA BEACH
COASTAL RAIL TRAIL MAINTENANCE DISTRICT
Engineer’s Report
Fiscal Year 2024/2025
The undersigned respectfully submits the enclosed Report as directed by City Council.
Report Submitted By:
By: ________________________________
Scott Koppel
Koppel & Gruber Public Finance
By: ________________________________
Mohammad Sammak
CITY COUNCIL ACTION:
______________________________________________________________________ ______________________________________________________________________ AGENDA ITEM # A.5.
STAFF REPORT
CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: May 22, 2024
ORIGINATING DEPT: Engineering Department
SUBJECT: City Council Consideration of Resolution 2024-049 and 2023-050 for the Engineer’s Report, the Annual Levy and Collection of Assessments for the Solana Beach Lighting District for FY 2024/25
BACKGROUND:
In 1987, the City Council adopted a resolution forming the Solana Beach Lighting District (District) under the provisions of the Landscape and Lighting Act of 1972, Division 15, Part 2, of the California Streets and Highways Code (1972 Act). The District was formed for the purpose of levying and collecting funds for the installation, operation, and maintenance of streetlight facilities within the City.
The 1972 Act requires the City Council to adopt a resolution annually directing the preparation and filing of an Annual Report and a Resolution of Intention to renew the District.
The resolutions declare the City Council's intention to levy and collect assessments and set the date of the public hearing at which the assessments will be levied. The law requires the assessment information to be submitted to the County by August 10th each year. In Fiscal Year (FY) 2008/09, fees for the District were suspended. During the period of FY 2009/10 through FY 2023/24, fees were collected but the rate was not increased. Staff is proposing no increase in fees for FY 2024/25.
Utilizing a portion of the reserve funds in the district, all City-owned streetlights were retrofitted to LED fixtures in 2012. The LED lights are much more energy efficient than the old lights. The streetlights in Solana Beach are not metered and the City pays a set rate for each light. SDG&E has reduced the rates for the LED retrofitted lights and the savings are reflected in the budget. The retrofitted LED lights use approximately 50% less energy than the standard streetlights that were previously used.
May 22, 2024
Lighting District for FY 2024/25
This item is before the City Council for the consideration of Resolution 2024-049 (Attachment 1) approving the Solana Beach Lighting Maintenance District Engineer’s Report for Fiscal Year 2024/25 and Resolution 2024-050 (Attachment 2) setting a time and place for a Public Hearing.
DISCUSSION:
The proposed Solana Beach Lighting Maintenance District Engineer's Report for FY 2024/25 is included as Attachment 3. The recommended assessment methodology is a Spread Methodology as outlined in the Calculation of Assessment Fees, page 7 of Attachment 3. The total amount to be assessed for streetlights for FY 2024/25 is $75,270.
The Derivation of Streetlighting Benefit Units table in Exhibit 2 (page 9 and 10) is found to be consistent with the current SANDAG Traffic Generation Manual and is appropriate for the associated land uses. The improvements include those designated in the district boundaries and shown in the City’s Streetlight Master Plan.
The District is the successor agency to portions of San Diego County Lighting Maintenance District Nos. 1 and 3 (LMD1 and LMD3). Ballots issued in 1982 and 1984 to levy assessments for LMD1 and LMD3 were approved to have a maximum charge of $25.00 per benefit unit. This maximum benefit unit charge will not apply to Zone B of the District as it was formed since Solana Beach was incorporated.
The annual assessment fees are collected based on property locations in the City, identified as Zone A or Zone B, as shown on the Streetlight Zone Map in Exhibit 1 (page 8) of Attachment 3. The annual assessment fees for this year are $8.80 per benefit unit for Zone A and $1.62 for Zone B. These fees are the same assessment fees as last year. In order to levy and collect an assessment in the District, it is necessary to notify the property owners of the City. The City will publish one notice in a newspaper of local circulation indicating the public hearing to be held on June 26, 2024.
CEQA COMPLIANCE STATEMENT:
Not a project as defined by CEQA.
FISCAL IMPACT:
The District has been financed by a benefit charge and by using the District’s share of one percent ad valorem property tax revenues since FY 1989/90. The amount to be generated from the benefit assessment is proposed to be $8.80 per benefit unit in Zone A and $1.62 in Zone B, which are unchanged from last year, for a total assessment of $75,270 in FY 2024/25. The amount to be assessed this year is slightly down from the assessed amount from last year. This is due to the property at the Solana Highlands Apartments along Nardo Avenue being classified as vacant land. Once construction of that project is completed, the property will be reclassified and the number of EDUs will increase.
May 22, 2024
Lighting District for FY 2024/25
WORK PLAN:
Renewal of the District is consistent with the Fiscal Sustainability section of the City’s Work Plan.
OPTIONS:
• Accept the Engineer’s Report for proceeding with the annual levy of assessments and set time and date for a public hearing on June 26, 2024. • Suspend assessment for FY 2024/25.
• Do not renew the Lighting District and provide direction to Staff.
DEPARTMENT RECOMMENDATION:
Staff recommends that the City Council:
1. Adopt Resolution 2024-049 approving the Solana Beach Lighting Maintenance District Engineer’s Report for Fiscal Year 2024/25 for proceedings of the annual levy of assessments within a special maintenance district.
2. Adopt Resolution 2024-050 declaring intention to provide for an annual levy and collection of assessment in a special maintenance district and setting a time and date for a public hearing; and scheduling the public hearing for June 26, 2024.
CITY MANAGER’S RECOMMENDATION:
Approve Department Recommendation.
____________________________
Alyssa Muto, City Manager
Attachments:
1. Resolution 2024-049, Approving Engineer’s Report
2. Resolution 2024-050, Setting Public Hearing
3. Lighting Maintenance District Engineer’s Report for FY 2024/25 RESOLUTION 2024-049
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SOLANA BEACH, CALIFORNIA, APPROVING THE
SOLANA BEACH LIGHTING MAINTENANCE DISTRICT
ENGINEER’S REPORT FOR FISCAL YEAR 2024/25 FOR
PROCEEDINGS FOR THE ANNUAL LEVY OF
ASSESSMENTS WITHIN A SPECIAL LIGHTING DISTRICT
WHEREAS, the City Council of the City of Solana Beach, California, pursuant to the terms of the "Landscaping and Lighting Act of 1972", being Division 15, Part 2 of the Streets and Highways Code of the State of California, did, by separate Resolution, initiate proceedings and order the preparation of the Engineer's Report (hereinafter referred to as Report) for the annual levy of assessments within a special Lighting District, said special Lighting District known and designated as Solana Beach Lighting District (hereinafter referred to as Lighting District); and WHEREAS, the Report, as required by said Division 15 of the Streets and Highways Code and as previously directed by Resolution, was presented to the City Council; and
WHEREAS, the City Council examined and reviewed the Report as presented and is satisfied with each and all the items and documents as set forth therein, and is satisfied that the assessments, on a preliminary basis, are spread in accordance with the special benefits received from the improvements to be maintained, as set forth in said Report.
NOW, THEREFORE, the City Council of the City of Solana Beach, California does resolve as follows:
1. That the above recitals are all true and correct
2. That the Solana Beach Lighting Maintenance District Engineer’s Report for Fiscal Year 2024/25, as presented, consists of the following:
a. Plans and specifications describing the general nature, location and extent of the improvements to be maintained as described in the City’s Street Light Master Plan. No other substantial changes in existing improvements or zones are proposed for the next fiscal year; all improvements to be maintained are in existing public streets, or sidewalks, or public leaseholds, of the City;
b. Estimate of cost, including the amount of the annual installment for the forthcoming fiscal year;
c. Diagram of the Lighting District;
Resolution 2024-049
Approve Engineering Report for Lighting District for FY 2024/25
d. Assessment of the estimated cost, including the amount of individual annual installments for the next fiscal year. No assessments on any existing parcels within the Lighting District are to be increased from those as levied in Fiscal Year 2023/24.
3. That the Report, as presented, is hereby approved on a preliminary basis, and is ordered to be filed in the Office of the City Clerk as a permanent record and to remain open to public inspection.
4. That the City Clerk shall certify the passage and adoption of this Resolution, and the minutes of this meeting shall so reflect the presentation of the Solana Beach Lighting Maintenance District Engineer’s Report for Fiscal Year 2024/25.
PASSED AND ADOPTED this 22nd day of May, 2024, at a Regular Meeting of the City Council of the City of Solana Beach, by the following vote:
AYES: Councilmembers –
NOES: Councilmembers –
ABSENT: Councilmembers –
ABSTAIN: Councilmembers –
_______________________________
LESA HEEBNER, Mayor
APPROVED AS TO FORM: ATTEST:
_________________________________ ________________________________ JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk RESOLUTION 2024-050
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF SOLANA BEACH, CALIFORNIA, DECLARING ITS
INTENTION TO PROVIDE FOR AN ANNUAL LEVY AND
COLLECTION OF ASSESSMENTS IN A SPECIAL
LIGHTING DISTRICT, AND SETTING A TIME AND PLACE
FOR PUBLIC HEARING THEREON
WHEREAS, the City Council of the City of Solana Beach, California, has previously formed a special Lighting District pursuant to the terms of the "Landscaping and Lighting Act of 1972", being Division 15, Part 2 of the Streets and Highways Code of the State of California, said special Lighting District known and designated as Solana Beach Lighting District (hereinafter referred to as the "Lighting District"); and WHEREAS, at this time, the City Council desires to initiate proceedings to provide for the annual levy of assessments for the next ensuing fiscal year to provide for costs and expenses necessary to pay for the maintenance of the improvements in said Lighting District; and
WHEREAS, the Solana Beach Lighting Maintenance District Engineer’s Report for Fiscal Year 2024/25 (herein referred to as Report), has been presented to and approved by the City Council as a separate action, as required by law, and the City Council desires to continue with the proceedings for said annual levy.
NOW, THEREFORE, the City Council of the City of Solana Beach, California, does resolve as follows:
1. That the above recitals are all true and correct.
2. That the public interest and convenience requires, and it is the intention of this legislative body, to levy and collect assessments to pay the annual costs and expenses for the installation, maintenance and/or servicing of such improvements from those parcels which specially benefit from improvements described below for the above-referenced Lighting District. The improvements are generally described as follows:
a. The operation, maintenance and servicing of the following improvements, all within existing public streets, public sidewalks, or public leaseholds of the City.
b. Public lighting and street lighting improvements, together with appurtenances.
Resolution 2024-050
Set Public Hearing for Lighting District for FY 2024/25
c. All improvements are detailed in the City’s Street Light Master Plan. No substantial changes in existing improvements or zones are proposed as a part of these proceedings.
3. That said works of improvement are of special benefit to the properties within the boundaries of said Lighting District, which Lighting District the legislative body previously declared to be the area specially benefited by said works of improvement, and for particulars, reference is made to the boundary map as previously approved by this legislative body, a copy of which is on file in the Office of the City Clerk and open for public inspection, and is designated by the name of this Lighting District.
4. That the Solana Beach Lighting Maintenance District Engineer’s Report for Fiscal Year 2024/25, as preliminarily approved by this legislative body, is on file with the City Clerk and open for public inspection. Reference is made to the Report for a full and detailed description of the improvements to be maintained, the boundaries of the Lighting District and any zones therein, and the proposed assessments upon assessable lots and parcels of land within the Lighting District.
5. All costs and expenses of the works of maintenance and incidental expenses have been apportioned and distributed to the benefiting parcels in accordance with the special benefits received from the proposed work. The amount assessed on any existing property has not been increased since the 2009/10 Fiscal Year.
6. Notice is hereby given of a public hearing on the 26th day of June, 2024 at 6:00 p.m.
7. At that time, the legislative body will consider and finally determine whether to levy the proposed annual assessment, and to hear all protests relating to said proposed proceedings, or the estimate of the cost and expenses of the proposed maintenance, or the proposed annual assessment; and any and all persons interested may file a written protest at [email protected] before 12:00 p.m. of the hearing day or, having filed such a protest, may file a written withdrawal of that protest at [email protected] prior to 12:00 p.m. of such hearing day. Any such written protest must state all grounds for objection. A written protest by a property owner must contain a description sufficient to identify the property owned by such person, e.g. assessor’s parcel number.
Any interested person may mail a protest to the following address:
CITY CLERK
CITY OF SOLANA BEACH
635 S. HIGHWAY 101
SOLANA BEACH, CA 92075
[email protected]
Resolution 2024-050
Set Public Hearing for Lighting District for FY 2024/25
To be considered by the legislative body, all protests must be received by 12:00 p.m. the public hearing date. A postmark prior to such date and time will not be sufficient.
8. That the City Clerk is hereby authorized and directed to give notice as required by law by causing a copy of the Resolution to be published in the newspaper of general circulation within said City; and publication to be completed not less than ten (10) days prior to the date set for the public hearing.
PASSED AND ADOPTED this 22nd day of May, 2024, at a Regular Meeting of the City Council of the City of Solana Beach, California by the following vote:
AYES: Councilmembers –
NOES: Councilmembers –
ABSTAIN: Councilmembers –
ABSENT: Councilmembers –
_______________________________
LESA HEEBNER, Mayor
APPROVED AS TO FORM: ATTEST:
_________________________________ ________________________________ JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk --
Prepared April 26, 2024
CITY OF SOLANA BEACH
LIGHTING MAINTENANCE DISTRICT
ENGINEER’S REPORT
FISCAL YEAR 2024/2025
Prepared by:
Dan Goldberg
Principal Civil Engineer
R.C.E. 57292
2 TABLE OF CONTENTS
INTRODUCTION ........................................................................................3 GENERAL DESCRIPTION OF THE DISTRICT..........................................3 DESIGNATION OF ZONES........................................................................4 DISTRICT IMPROVEMENT........................................................................4 METHOD OF APPORTIONMENT..............................................................6 DISTRICT FINANCING ..............................................................................6 ASSESSMENT ROLL ................................................................................6 CALCULATION OF ASSESSMENT FEES ................................................7 EXHIBIT 1 – STREETLIGHT ZONE MAP ..................................................8 EXHIBIT 2 – DERIVATION OF STREETLIGHT BENEFIT UNITS..............9 EXHIBIT 3 – BUDGET 2024-2025............................................................11 3 Introduction
The City of Solana Beach (“City”) Lighting Maintenance District (“District”) was formed to provide funding for operation, maintenance and servicing of all lights within the City, owned both by City of Solana Beach and San Diego Gas and Electric as shown on the City’s Streetlight Master Plan. The City Council, pursuant to the provisions of the “Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Street and Highway Code of California” (Act), desires to levy and collect annual assessment against lots and parcels within the District beginning in the fiscal year beginning July 1, 2024, and ending June 30, 2025. The collected assessments would pay for the operation, maintenance and servicing of the public lighting improvements within the City. The proposed assessments are based on the City’s estimate for the cost for fiscal year 2024/2025 to maintain the District that provides a special benefit to properties assessed within the District. The assessment rates set for Fiscal Year 2024/2025, as set forth in this Engineer’s Report (“Report”), do not exceed the maximum rates established at the time the District was formed, therefore, the City and the District are not required to go through property owner ballot procedure to establish the 2024/2025 assessment rates.
This report describes the District boundaries and the proposed operation, maintenance and services to be assessed to the property owners located within the District. For this Report, each lot or parcel to be assessed refers to an individual property and is assigned its own Assessment Parcel Number (“APN”) by the San Diego County (“County”) Assessor’s Office as shown on the latest equalization roll of the assessor.
Following the conclusion of the Public Hearing, the City Council will confirm the Report as submitted or amended and may order the collection of the assessments for Fiscal Year 2024/2025.
General Description of the District
The boundaries of the District are defined as being contiguous with the boundaries of the City of Solana Beach. The properties within the District include single-family residential, multi-family residential, timeshare, multiuse, commercial and industrial parcels.
Section 22573, Landscape and Lighting Act of 1972 (“1972 Act”), requires assessments to be levied according to benefit rather than according to assessed value. This section of the 1972 Act states:
"The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.”
4 The 1972 Act also provides for the classification of various areas within an assessment district into different zones where, "...by reason of variations in the nature, location, and extent of the improvements, the various areas will receive differing degrees of benefit from the improvements. A zone shall consist of all territory, which will receive substantially the same degree of benefit from the improvements. An assessment district may consist of contiguous or non-contiguous areas."
Properties owned by public agencies, such as a city, county, state, or the federal government, are not assessable without the approval of the particular agency. For this reason, they are traditionally not assessed.
Designation of Zones
The District consists of two zones in the City of Solana Beach; Zone “A” and Zone “B”.
Properties within Zone “A”, which represent the majority of the parcels in the City, benefit from streetlights on six significant circulation element streets as well as streetlights on their local streets. Properties within Zone “B”, also known as “Dark Sky Zone”, do not have streetlights on their local streets. These properties benefit only from streetlights on circulation element streets and do not benefit from streetlights on local streets. A map showing the boundaries of the District and the zones is on file in the office of the City Engineer and is also attached herein as Exhibit 1.
District Improvements
The public lighting improvements to be maintained and serviced include but are not limited to the following:
• Maintenance, repair and replacement of public light poles and fixtures, including changing light bulbs, painting, photoelectric cell repair or replacement, repairing damages caused by automobile accidents and vandalism, and repairing normal deterioration caused by time and weather.
• Electrical conduit repair and replacement due to damage by vandalism and normal deterioration.
• Service-call maintenance repair and replacement including painting, replacing worn out electrical components and repairing damage due to accidents, vandalism, and normal deterioration.
• Payment of the electrical bill for the existing street lighting system. • Responding to constituent and business inquiries and complaints regarding the public lighting.
5 Maintenance
The City provides services and furnishes materials for the ordinary and usual maintenance, operation and servicing of public lighting improvements facilities and appurtenant facilities. This includes inspecting lights during daylight as well as evening hours for condition assessment and performing repair, removal or replacement of all or part of any of the streetlights found to be inoperable in order to provide for the health welfare and safety of the residents in the district.
Servicing
The City workforce along with assistance from private contractors provide all labor, materials, equipment and utilities necessary to maintain and operate the public lighting improvements or appurtenant facilities in order to provide adequate illumination.
City’s Streetlight System
The City’s streetlight system consists of streetlights which are owned by San Diego Gas and Electric (SDG&E) and streetlights that are owned by the City of Solana Beach. A listing (printout) showing the type, size, location and ownership of the specific streetlights in the City is on file in the Office of the City Engineer. There are currently 801 streetlights in the District of which 149 are located on circulation element streets such as Highway 101, Lomas Santa Fe Drive, Via De La Valle, Cedros Avenue, San Andres Drive, Highland Avenue and Stevens Avenue. The remaining 652 streetlights are located on local streets. Approximately 274 streetlights are owned and maintained by SDG&E and the remaining 527 streetlights are owned and maintained by the City of Solana Beach. The City pays SDG&E for the use of their streetlights. For the purpose of this report, all lights have been analyzed regardless of ownership. Additionally, there are 247 bollard lights and 16 pedestrian pole lights on the Coastal Rail Trail that are included in the District.
Streetlight Retrofit
In April 2012, the City entered into an agreement with Chevron Energy Solution (Chevron ES) for a series of energy efficient projects, which included retrofitting all Cityowned streetlights to the latest LED technology. This project replaced the approximately two-thirds of the streetlights throughout the City that are owned and operated by the City. The remaining one-third of the streetlights were not retrofitted because they are owned and operated by SDG&E. Because of this partial ownership arrangement, a few streetlights in some neighborhoods remained unchanged.
Capital Improvement Projects
Since the City-owned streetlights were converted to LED fixtures in 2012, there was not a need for a capital improvement project for the streetlights this past year. 6 Method of Apportionment
The 1972 Act requires that a parcel’s assessment may not exceed the reasonable cost for the proportional benefit conferred to that parcel. To establish the benefit to the individual lots or parcels within the district, an Equivalent Benefit Unit (“EBU”) system based on land use is used along with special consideration based on City’s “Dark Sky Zone”. Each parcel of land in the District was determined by the Engineering Department to have a specific land use. Each land use type was assigned a land use factor determined by trip generation rates developed by San Diego Association of Government (SANDAG). If a land use was not included in the SANDAG’s study, the Engineering Department made a determination as to its probable trip generation compared to that of a single family residential and assigned a land use factor accordingly. Single-family residential units were assigned a land use factor of 1.0 regardless of its size. The theory is that all single-family residential units, regardless of parcel size, generate approximately the same number of trips and therefore receive the same benefit from the use of streets and their appurtenances such as streetlights.
Under this method, vacant lots are assigned an EBU of “0”. Exhibit 2 provides the EBU determination for all land uses within the City.
District Financing
The District will be financed by assessing a benefit assessment and by using the District’s share of 1.0 percent ad valorem tax revenues. The amount to be generated from the benefit assessment is $8.80 per benefit unit in Zone “A” and $1.62 per benefit unit in Zone “B”. As mentioned above, the total amount of revenue to be generated by assessment was calculated from a methodology, which identifies two benefit zones within the District. This methodology assumes that circulation element streetlights provide City-wide benefit and therefore properties located in Zone “B”, the Dark Sky Zone properties, are assessed for this portion of the District’s expenses only. Properties located within Zone “A” are assessed for expenses associated with the streetlights located on the circulation element streets as well as those on local streets. Both the circulation element streetlight benefit and local streetlight benefit are allotted in proportion to the Average Daily Traffic (ADT) generated by properties within the District to establish equivalent benefit charge per property. These are estimates only because the County Assessor’s information will not be available until August 2024. The City does not assess governmental agencies owning properties within the District. See Exhibit 3 for the proposed District budget.
Assessment Roll
Parcel identification, for each lot or parcel within the District shall be the parcel as shown on the County Assessor’s map for the year in which this Report is prepared. 7 A listing of parcels assessed within the District, along with the proposed assessment amounts, has been submitted to the City Clerk, under a separate cover, and by reference is made part of this Report. Said listing of parcels to be assessed shall be submitted to the County Auditor/Controller and included on the property tax roll for each parcel in Fiscal Year 2024/2025. If any parcel submitted for collection is identified by the County Auditor/Controller to be an invalid parcel number for the current fiscal year, a corrected parcel number and/or new parcel numbers will be identified and resubmitted to the County Auditor/Controller. The assessment amount to be levied and collected for the resubmitted parcel or parcels shall be based on the method of apportionment and assessment rate approved in this Report. Therefore, if a single parcel has changed to multiple parcels, the assessment amount applied to each of the new parcels shall be recalculated and applied according to the approved method of apportionment and assessment rate rather than a proportionate share of the original assessment.
Calculation of Assessment Fees
Following is a calculation of assessment fees for the Solana Beach Lighting District.
There are two zones in this lighting district; Zone “A” and Zone “B”.
Total streetlights on six circulation element streets 149 Total streetlights on local streets 652
Total streetlights 801
Bollard lights on Coastal Rail Trail 247
Pedestrian pole lights on Coastal Rail Trail 16
Total Benefit Units in Zone “A” 8,465
Total Benefit Units in Zone “B” 480
Assessment per Benefit Unit in Zone “A” $8.80
Assessment per Benefit Unit in Zone “B” $1.62
Total Assessment for Zone “A” $74,492
Total Assessment for Zone “B” $778
Total Assessment for the District $75,270
8 EXHIBIT 1
STREETLIGHT ZONE MAP
Dar\,; Sky Areas
Zone B
6 N
SAN DIEGO
COUNTY
9 EXHIBIT 2
DERIVATION OF STREETLIGHT BENEFIT UNITS
Traffic generation rates are derived from a report issued by the San Diego Association of Governments (SANDAG) dated April 2002. The information in the report is based on the San Diego Traffic Generators manual. Land uses are defined by the County Assessor. Using traffic generated by single family dwellings as 10 per dwelling unit (d.u.) or 40 per acre, the derivation of Benefit Units from land use is as follows:
LAND USE BENEFIT UNITS HOW DERIVED
Vacant Land 0.0 Generates little or no traffic.
Assigned a value of 0.0
Residential 1.0/d.u. 10 trips/d.u.
10 trips/d.u.
Time Shares .02/Time Share 0.2 trips/time share
10 trips/d.u.
Mobilehome/Trailer Parks 0.5/Space 5 trips/d.u. or space 10 trips/d.u.
1-3 Story Misc. Stores 10.0/Acre 400 trips/acre
40 trips/acre
4+ Story Offices/Stores 15.0/Acre 600 trips/acre
40 trips/acre
Regional Shopping Center
Medical, Dental, Animal Hospital
12.5/Acre 500 trips/acre
40 trips/acre
Community Shopping Center 17.5/Acre 700 trips/acre
40 trips/acre
Neighborhood Shopping Center 30.0/Acre 1200 trips/acre
40 trips/acre
10 Hotel, Motel 5.0/Acre 200 trips/acre
40 trips/acre
Convalescent Hospital, Rest Home 1.0/Acre 40 trips/acre 40 trips/acre
Office Condominiums 0.5/Condo 20 trips/condo
10 trips/d.u.
Parking lot, Garage, Used Cars,
Auto Sales/Service, Service Station
7.5/Acre 300 trips/acre
40 trips/acre
Bowling Alley 7.5/Acre 300 trips/acre
40 trips/acre
11 EXHIBIT 3
STREETLIGHT DISTRICT
PROPOSED BUDGET
FISCAL YEAR 2024-25
Amended Budget
2023-24
Adopted Budget
2024-25
COSTS
Energy $118,500 $120,000
Maintenance 365,648 376,993
Administration 270,443 279,875
Capital Outlay 0 0
Debt Service 70,375 70,375
Contingency Reserve 3,457,689 3,380,498
TOTAL COSTS $4,282,655 $4,227,741
FUNDING
Property Taxes $634,482 $640,827
Benefit Fees 76,006 76,500
Interest 42,525 42,525
Intergovernmental 10,200 10,200
Fund Balance 3,519,442 3,457,689
TOTAL RESOURCES $4,282,655 $4,227,741
CITY COUNCIL ACTION:
______________________________________________________________________ ______________________________________________________________________ AGENDA ITEM # A.6.
STAFF REPORT
CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: May 22, 2024
ORIGINATING DEPT: Public Works Department
SUBJECT: City Council Consideration of Resolution 2024-060 Ratifying the Interim City Manager’s Decision to Execute Change Order No. 1 to the Construction Contract for
Exterior Painting and Stucco Repairs at City Hall with
Polychrome Construction, Inc., Accept this Project as
Complete and Authorize the City Clerk to File a Notice of Completion
BACKGROUND:
The City of Solana Beach City Hall building was last painted in 2007 and was in need of exterior painting and stucco repairs. Due to the coastal environment, exterior painting and stucco repairs were necessary, as the City Hall building provides essential services to the community. The Adopted Budget for Fiscal Year 2023/2024 appropriated $125,000 in the Capital Improvement Program (CIP) for exterior painting and stucco repairs for the City Hall Facility.
In October 2023, Staff issued a Request for Bids (RFB), Bid No. 2023-10, via an electronic bid site to solicit proposals from firms qualified to provide painting and stucco repair services. Seven bids were received by the closing date. On November 14, 2023, at 2:00 p.m., the City Clerk’s Office opened the bids and read them publicly.
On December 13, 2023, the City Council authorized the City Manager to enter into a construction contract with Polychrome Construction, Inc. (Polychrome) for painting and stucco repairs at City Hall, Resolution 2023-131.
This item is before the City Council for the consideration of Resolution 2024-060 (Attachment 1) that would ratify the Interim City Manager’s decision to execute Change Order No. 1 to the construction contract with Polychrome, report the final project costs, accept the project as complete and direct the City Clerk to file a Notice of Completion (NOC).
May 22, 2024
Change Order No. 1 and NOC - Polychrome Construction, Inc.
DISCUSSION:
During the stucco repair process, it was discovered that additional measures were needed to protect the building from moisture infiltration. Polychrome recommended the use of the Tremco Solargard Hy-Build Fibrous Elastomeric (Tremco) product, a highquality product known for its effectiveness in waterproofing and moisture protection. In several instances, and especially during the 2024 storm events, water intrusion caused significant damage to the City Hall building, such as carpet, drywall, and tile damage, leading to costly repairs. Utilizing the Tremco’s waterproofing solutions would have effectively prevented many, if not most, of these issues by providing a durable barrier against moisture penetration. After careful consideration, the Interim City Manager decided to approve the use of the Tremco product for this purpose. This decision was made based on the contractor’s expertise and the product’s proven track record in similar projects. A copy of Change Order No. 1 is included with this Staff Report as Attachment
2. The Interim City Manager’s approval reflects a commitment to ensuring the longevity and structural integrity of the building, which ultimately benefits the community and City Staff by reducing the risk of future moisture-related issues. Although the amount of the change order was outside Interim City Manager’s limit as detailed in Section 3.08.105 (B) of the Solana Beach Municipal Code, due to the short time frame for completion of this project (one week), there was not sufficient time to obtain City Council approval of the change order without unduly delaying the contractor and completion of the project.
Polychrome Construction, Inc., completed all work on this project in accordance with the approved plans and specifications of Bid No. 2023-10 to the satisfaction of the City Engineer on May 3, 2024.
CEQA COMPLIANCE STATEMENT:
Exempt pursuant to Section 15301(a) of the State CEQA Guidelines.
FISCAL IMPACT:
The Adopted Budget for Fiscal Year 2023/2024 appropriated $125,000 in the Capital Improvement Program (CIP) for exterior painting and stucco repairs for the City Hall Facility.
The City Council approved a construction contract with Polychrome Construction, Inc., in the amount of $47,745, and a recommended contingency amount of $7,161 (15%), for a total amount of $54,906.
City Staff is recommending that the City Council ratify the Interim City Manager’s decision to approve the use of the Tremco product, at a cost of $39,085, bringing the final contract May 22, 2024
Change Order No. 1 and NOC - Polychrome Construction, Inc.
amount to $86,830. Please note that there was a remaining balance of $70,094 for FY 2023/24 in the CIP project fund would more than offset this additional expenditure.
WORK PLAN:
Since this project was listed in the Capital Improvement Program section of the Fiscal Year 2023/2024 Adopted Budget, this project is consistent with the item in the Workplan for “Capital Project Construction Management”.
OPTIONS:
• Approve Staff recommendation.
• Approve Staff recommendations with modifications.
• Provide alternative direction to Staff.
DEPARTMENT RECOMMENDATION:
Staff recommends that the City Council adopt Resolution 2024-060:
1. Ratifying the City Manager’s decision to execute Change Order No. 1 to the construction contract with Polychrome Construction, Inc., in an amount of $39,085, for a total amount of $86,830, for Fiscal Year 2023/24.
2. Authorizing the City Clerk to file a Notice of Completion.
CITY MANAGER’S RECOMMENDATION:
Approve Department Recommendation.
_________________________
Alyssa Muto, City Manager
Attachments:
1. Resolution 2024-060
2. Change Order No. 1
RESOLUTION 2024-060
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SOLANA BEACH, CALIFORNIA, RATIFYING THE INTERIM
CITY MANAGER’S DECISION TO EXECUTE CHANGE
ORDER NO. 1 TO THE CONSTRUCTION CONTRACT FOR
EXTERIOR PAINTING AND STUCCO REPAIRS AT CITY
HALL WITH POLYCHROME CONSTRUCTION, INC.,
ACCEPT THIS PROJECT AS COMPLETE AND AUTHORIZE
THE CITY CLERK TO FILE A NOTICE OF COMPLETION
WHEREAS, the City of Solana Beach City Hall building needed exterior painting and stucco repairs. The City Hall building was last painted in 2007; and WHEREAS, in October 2023, Staff issued a Request for Bids (RFB), Bid No. 2023- 10, via an electronic bid site to solicit proposals from firms qualified to provide painting and stucco repair services. Seven bids were received by the closing date of November 14, 2023; and
WHEREAS, on December 13, 2023, the City Council authorized the City Manager to enter into a Construction Contract with Polychrome Construction, Inc. (Polychrome) for painting and stucco repairs at City Hall, Resolution 2023-131; and WHEREAS, during the construction process, it was discovered that additional measures were needed to protect the building from moisture infiltration. Polychrome recommended the use of the Tremco Solargard Hy-Build Fibrous Elastomeric product, a high-quality product known for its effectiveness in waterproofing and moisture protection; and
WHEREAS, in several instances, and especially during the 2024 storm events, water intrusion caused significant damage to the City Hall building, such as carpet, drywall, and tile damage, leading to costly repairs. Utilizing the Tremco’s waterproofing solutions would have effectively prevented many, if not most, these issues by providing a durable barrier against moisture penetration; and
WHEREAS, the Fiscal Year 2023/2024 Adopted Budget appropriated $125,000 in the Capital Improvement Program (CIP) for exterior painting and stucco repairs for the City Hall building; and
WHEREAS, the City Council approved a construction contract with Polychrome Construction, Inc., in the amount of $47,745, and a recommended contingency amount of $7,161 (15%), for a total amount of $54,906; and
WHEREAS, City Staff recommended that the City Council ratify the Interim City Resolution No. 2024-060
Change Order No. 1 and NOC - Polychrome Construction, Inc.
Manager’s decision to approve the use of the Tremco product, at a cost of $39,085, bringing the not to exceed amount to $86,830.
NOW, THEREFORE, the City Council of the City of Solana Beach, California, does resolve as follows:
1. That the foregoing recitations are true and correct.
2. That the City Council ratifies the Interim City Manager’s decision to execute Change Order No. 1 to the construction contract with Polychrome Construction, Inc., in an amount of $39,085, for a total amount of $86,830, for Fiscal Year 2023/24.
3. That the City Council authorizes the City Clerk to file a Notice of Completion.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Solana Beach, California, held on the 22nd day of May 2024 by the following vote.
AYES: Councilmembers –
NOES: Councilmembers –
ABSENT: Councilmembers –
ABSTAIN: Councilmembers –
______________________________
LESA HEEBNER, Mayor
APPROVED AS TO FORM: ATTEST:
________________________________ ______________________________ JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk City Hall Painting and Stucco Repairs – Change Order No. 1
CITY OF SOLANA BEACH
CONTRACT CHANGE ORDER
Date May 7, 2024
Project: City Hall Exterior Painting and Stucco Repairs Change Order 1
Purchase Order # 22400169
PROJECT TITLE: City Hall Exterior Painting and Stucco Repairs, Bid No. 2023-10 This change order compensates the contractor for the items listed below. Request for Change Order No. 1 dated May 7, 2024 (attached).
1. Recommended application of Tremco Solargard Hy-Build Fibrous Elastomeric to mitigate and protect against unwanted water intrusion. Price includes all Material, Prevailing wage Labor and Boom Lifts
TOTAL CHANGE TO CONTRACT AMOUNT: $39,085.00
CHANGE TO CONTRACT WORKING DAYS: 0
All work related to this change order shall be done in accordance with the Project Special Provisions, the Project Plans, and the Standard Specifications for Public Works Construction “Greenbook”, 2018 Edition (Standard Specifications). This change order shall include all labor, materials, tools, equipment and incidentals as required to complete the work complete and in place. No additional compensation shall be due to the contractor as a result of this change order.
This change order shall include all general contractor's overhead, extended overhead, profit, incidentals, bonds and lost time. Contractor shall not be entitled to any additional payments or time extensions beyond what is detailed in this change order.
City Hall Painting and Stucco Repairs – Change Order No. 1
Estimated Cost: Increase $39,085.00 Decrease -- No Change -- By reason of this change order the time of completion will be extended by -0- days.
Recommended By:
Mohammad Sammak, City Engineer
Contract Summary
Approved: CITY OF SOLANA BEACH
Initial Contract Amount $47,745.00 By:
Daniel King, Interim City Manager
Date:
This Change Order $39,085.00
Approved: POLYCHROME CONST.
Total Contract to Date $86,830.00 By:
Additional Appropriation Required No Date:
April 26, 2024
From: Polychrome Construction Inc.
8908 Balboa Blvd. Northridge, CA. 91325
Lic # 993826
DIR# 1000020697
To: City of Solana Beach
635 Hwy 101,
Solana Beach, CA 92075
Att: Mr. Mo Sammak
Principal Engineer
RE: Tremco Waterproofing Material Coating for Selected walls of City Hall
PROPOSAL
Dear Mr. Sammak,
Submitted herewith is our proposal for the Exterior waterproofing of selected exterior walls as per our site visit on April 25, 2024. After examining the areas of the exterior walls that appear to have the water intrusion issue, we are suspecting that the walls are failing to protect the building from water penetration at the upper rooftop areas where the wall fuses into what can be considered a partial roof. When rainfall conditions exist, the rain hits the horizontal surface area of the wall/roof of the building at a higher velocity than the vertical part of the wall therefore encouraging water penetration to occur. It appears that those areas of the walls that take a curvature are prone to conditions that a proper roof would encounter therefore a suitable roofinglike coating should mitigate the water intrusion problem.
We recommend the Tremco Solargard Hy-Build Fibrous Elastomeric. It is a water-based, acrylic, elastomeric roof and wall coating formulated to provide a tough, durable, flexible, breathable film protection of previously painted or unpainted masonry walls.
The walls to receive the Tremco Solargard Hy-Build will be power washed to remove all dirt, debris, algae, and dust in order to create a clean substrate for the coating to adhere to. Any loose or peeling paint and damaged stucco will be scraped and removed, and any cracks will be filled with elastomeric caulking and stucco patch to blend with the existing texture. (This cleaning and prepping procedure is documented here as a formality and the city is not being charged for it in this quote as it is already included in the painting contract that already exists). (1)
~OLYC~Romt: 'I__:: CONSTRUCTION , INC
Once the surfaces are prepped, they will receive a coat of Tremco Solargard Hy-Build in white to a mil thickness of 24 wet mils. Once the Material is dry ( usually 24 hr wait time ) then it will be ready to be top coated with the Loxon Flat paint (this is part of the original painting contract and separate of this quote).
Price includes all Material, Prevailing wage Labor and Boom Lifts. $ 39,085.00 (Thirty-Nine Thousand and Eighty-Five Dollars and Zero cents) Regards,
Marios Polychronas
President
Polychrome Construction Inc
(2)
8908 Balboa Blvd, Northridge, CA 91325 818-831-8308 Fax 818-775-9944 License # 993826 Walls to receive
Walls to receive the
Tremco Coating
!~)~~
'<~~>.
\(;(2t 0{1'4{ l(.1 l'
~---r~r-T .;;-~.
Walls to receive
the Tremco
Coating
Wall to receive the
Tremco Coating
receive
Tremco
Coating
Wall to receive
Tremco Coating
COUNCIL ACTION:
______________________________________________________________________ ______________________________________________________________________ AGENDA ITEM # B.1.
STAFF REPORT
CITY OF SOLANA BEACH
TO: Honorable Mayor and City Councilmembers
FROM: Alyssa Muto, City Manager
MEETING DATE: May 22, 2024
ORIGINATING DEPT: Community Development Department
SUBJECT: Public Hearing: Request for a Time Extension for an Approved Conditional Use Permit Modification for the
Construction of a 60-Foot-Long Drilled Micropile/Caisson Return Wall at the Southern Terminus of the Seawall on the Coastal Bluff Below 135 S. Sierra Avenue, Solana Beach.
Case No: TE23-002; Applicant: Las Brisas HOA, APN: 298- 010-51-01 to 36 Resolution 2024-029
BACKGROUND:
The Applicant, Las Brisas Homeowners Association, is requesting a 12-month time extension to the Conditional Use Permit Modification (CUP mod.) originally approved on February 9, 2022, with the adoption of Resolution 2022-013, to construct a Bluff Retention Device (BRD) consisting of a return wall that would extend from the top of the southern terminus of the existing seawall approximately 60 feet to the top of the bluff. The shotcrete wall would be constructed with a drilled micropier/caisson design with structural concrete between piers. The exposed areas of the wall would be covered with hand sculpted, colored shotcrete to match the natural bluff surface and color. Areas of failed mid-to upper-bluff, north of the wall, will be reconstructed with geogrid and soil and covered with a hydroseed application that would utilize drought resistant, salt tolerant native species.
The return wall would encapsulate and restore the bluff to an acceptable factor of safety for the existing residential structures onsite at 135 S. Sierra Avenue. The project would also allow public pedestrian access and public agency vehicle access near the top of the bluff that is currently closed.
The project was set to expire 24 months from the original approval date; therefore, it was set to expire February 9, 2024. The Applicant applied for the extension request on December 7, 2023. The permit expiration is considered to be on hold until the City Council is able to make a determination on the project.
May 22, 2024
Time Extension TE23-002
135 S. Serra Ave. – Las Brisas HOA
This item is before the City Council to consider adoption of Resolution 2024-028 (Attachment 1) approving the Applicant’s request to formally extend the project approval as provided under the Solana Beach Municipal Code (SBMC) 17.72.110 for 12 months starting from the original expiration date of February 9, 2024.
DISCUSSION:
In 2022, the City Council adopted Resolution 2022-013 conditionally approving a CUP mod. for the construction of the BRD and upper bluff restoration. The previous City Council agenda packet has been provided for reference in Attachment 2.
Prior to the expiration date, the Applicant had obtained California Coastal Commission (CCC) approval of the project and had obtained a grading permit issued by the City of Solana Beach. When holding a pre-construction meeting onsite, the contractor the Applicant had retained to perform the work backed out of the contract due to the conditions of the site. The Applicant had to find and retain another qualified contractor to do the work. Once a new contractor was retained, new engineering plans had to be drawn up as the previous firm retained the ownership of the previous plans. The Applicant determined they were not going to be able to complete this prior to the discretionary expiration date, therefore, they requested the project extension.
The approval under Resolution 2022-013 was set to expire on February 9, 2024. The Applicant submitted a formal application on December 7, 2023, more than 60 days before the expiration date in accordance with SBMC Section 17.72.110. The Code indicates that:
One or more (but not more than a total of four) extensions may be granted not exceeding a cumulative total of 24 months after the date the original approval of the project expires. The duration of an extension shall be in an increment of 30 days. The minimum duration of an extension shall be six months. The maximum duration of an extension shall not be more than 12 months. The duration of an extension shall be determined at the discretion of the issuing authority.
The Applicant is requesting to extend the expiration by 12 months to February 9, 2025, due to the unique circumstances of the project and the restricted construction times for coastal bluff projects. The extension would allow the Applicant sufficient time to process a revision to the CCC permit and the grading permit, if necessary, obtain authorization from the CCC and the associated grading permit required by the City and start construction. The project extension application (Attachment 4) indicates how they will use the 12-month extension period to obtain the required permits and commence construction.
SBMC Section 17.72.110 establishes that City Council action is required to review and act on a request for an extension of a CUP mod. when City Council was the original approving body. The City Council may extend the approval of a project if they are able to make the seven (7) required findings, which are as follows:
May 22, 2024
Time Extension TE23-002
135 S. Serra Ave. – Las Brisas HOA
1. The applicant has presented facts which establish that the applicant has timely and diligently pursued issuance of a building permit during the 24-month period following the issuance of the original approval for the project (or the different period set forth as a condition of approval of the project) or during the then current extension period;
2. Circumstances beyond the applicant’s control have intervened and prevented the applicant from obtaining the issuance of a building permit for the project prior to expiration of the 24-month period (or the expiration date established as a condition of the approval) or during the then current extension period;
3. The application for the extension sets forth a reasonable and substantial factual basis for issuance of the extension;
4. There is a substantial factual basis to determine that the applicant will be able to perform the actions necessary to obtain issuance of a building permit prior to expiration of the requested extension;
5. The duration of the extension requested by the applicant is no longer than is reasonably necessary to perform the actions necessary to obtain the issuance of a building permit;
6. There have not been any significant changes in the general plan, applicable specific plan, if any, zoning, or character of the area within which the project is located that would cause the approved project to become inconsistent, incompatible, or nonconforming therewith; and
7. The granting of an extension shall not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity.
The draft Resolution of Approval has been prepared by Staff for the consideration of the City Council. The draft Resolution is based upon the information provided in this report.
The City Council may direct Staff to modify Resolution 2024-029 to reflect the findings and conditions it deems appropriate as a part of the public hearing process. In the alternative, if the City Council determines the request is to be denied, Staff will prepare a Resolution of Denial for an action to be taken at a subsequent City Council meeting.
Notices of a Public Hearing for this project were mailed to property owners and occupants within 300 feet of the project site more than 10 days prior to the City Council date. As of the date of preparation of this Staff Report, no phone calls, letters, or emails have been received by Staff in regard to the extension request.
May 22, 2024
Time Extension TE23-002
135 S. Serra Ave. – Las Brisas HOA
CEQA COMPLIANCE STATEMENT:
Time Extensions are not a project as defined by CEQA. The original project was found exempt pursuant to the 2022 State of California CEQA Guidelines Sections 15269.
FISCAL IMPACT: N/A
WORK PLAN: N/A
OPTIONS:
∙ Approve the requested time extension and minor modifications. ∙ Deny the request for a time extension and minor modifications. ∙ Provide direction to Staff.
DEPARTMENT RECOMMENDATION:
Staff recommends that the City Council:
1. Conduct the Public Hearing: Open the Public Hearing, Report Council disclosures, Receive Public testimony, Close the Public Hearing.
2. If the City Council can make the required findings, adopt Resolution 2024-029, approving the request for a Time Extension for approvals and entitlements in Case No. CUP20-004 and setting the expiration date as February 9, 2025.
CITY MANAGER’S RECOMMENDATION:
Approve Department Recommendation
_________________________
Alyssa Muto, City Manager
Attachments:
1. Resolution 2024-029
2. Original Public Hearing Package
3. New Project Plans
4. Extension Request Application
RESOLUTION 2024-029
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SOLANA BEACH, CALIFORNIA, CONDITIONALLY
APPROVING A TIME EXTENSION TO A PREVIOUSLY
APPROVED CONDITIONAL USE PERMIT MODIFICATION
FOR THE CONSTRUCTION OF A MICROPILE RETURN WALL,
MID-AND UPPER-BLUFF RESTORATION AND
LANDSCAPING BELOW 135 S. SIERRA AVENUE IN SOLANA
BEACH
APPLICANT: LAS BRISAS
CASE NO.: TE23-002 TIME EXTENSION
APN: 298-010-51-01 to 36
WHEREAS, the Las Brisas Homeowners Association (hereinafter referred to as “Applicant”) has submitted a request for a time extension of the approved Development Review Permit (DRP) and Structure Development Permit (SDP) pursuant to Title 17 (Zoning), of the Solana Beach Municipal Code (SBMC); and WHEREAS, the City Council adopted Resolution 2022-013 approving the project at the regularly scheduled February 9, 2022, City Council meeting; and WHEREAS, the original discretionary approval was set to expire on February 9, 2024; and
WHEREAS, the Applicant submitted a request for a 12-month extension of the project approval; and
WHEREAS, on May 22, 2024, the City Council held a duly noticed Public Hearing to consider the time extension request and minor modifications; and WHEREAS, the Public Hearing was conducted pursuant to the provisions of SBMC
17.72.030 of the Solana Beach Zoning Ordinance; and
WHEREAS, at the Public Hearing, the City Council received and considered evidence concerning the request for a Time Extension; and WHEREAS, the City Council of the City of Solana Beach found that a Time Extension Request is not a project according to the State California Environmental Quality Act (CEQA) Guidelines; however, the City Council found that the original project was found exempt pursuant to the 2022 State of California CEQA Guidelines Section 15269; and WHEREAS, this decision is based upon the evidence presented at the Hearing, and any information the City Council gathered by viewing the site and the area as disclosed at the Hearing.
Resolution 2024-029
TE23-002 Las Brisas Time Extension
NOW THEREFORE, the City Council of the City of Solana Beach, California, does resolve as follows:
1. That the foregoing recitations are true and correct.
2. That the request for a 12-month Time Extension for a Conditional Use Permit Modification to construct a Bluff Retention Device (BRD) consisting of a return wall with a drilled pier/caisson design with structural concrete between the piers covered with hand sculpted, colored shotcrete would extend from the top of the southern terminus of the seawall approximately 60 feet to the top of the bluff is conditionally approved based on the following:
3. FINDINGS:
A. In accordance with Section 17.72.110 (Lapse of Approval and Extensions) of the City of Solana Beach Municipal Code, the City Council finds the following:
I. The Applicants have presented facts which establish that the Applicants have timely and diligently pursued issuance of a building permit during the 24-month period following the issuance of the original approval for the project;
II. Circumstances beyond the Applicants’ control have intervened and prevented the Applicants from obtaining the issuance of a building permit for the project prior to expiration of the 24-month period following the issuance of the original approval for the project; III. The application for the extension sets forth a reasonable and substantial factual basis for issuance of the time extension; IV. There is a substantial factual basis to determine that the Applicants will be able to perform the actions necessary to obtain issuance of a building permit prior to expiration of the requested extension; V. The duration of the time extension requested by the Applicants is not longer than is reasonably necessary to perform the actions necessary to obtain the issuance of a building permit;
VI. There have not been any significant changes in the general plan, applicable specific plan, if any, zoning, or character of the area within which the project is located that would cause the approved project to become inconsistent, incompatible, or nonconforming therewith; and Resolution 2024-029
TE23-002 Las Brisas Time Extension
VII. The granting of an extension shall not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity.
1. CONDITIONS:
Prior to use or development of the property in reliance on this permit, the Applicant shall provide for and adhere to the conditions of the original project approval of Resolution 2022-013.
2. ENFORCEMENT: Pursuant to SBMC 17.72.120(B) failure to satisfy any and all of the above-mentioned conditions of approval is subject to the imposition of penalties as set forth in SBMC Chapters 1.16 and 1.18 in addition to any applicable revocation proceedings.
3. EXPIRATION: The Conditional Use Permit for the project will expire 12 months from the date of expiration of the original project approval, unless the Applicant has obtained building permits and have commenced construction prior to that date, and diligently pursued construction to completion.
4. INDEMNIFICATION AGREEMENT: The Applicant shall defend, indemnify, and hold harmless the City, its agents, officers, and employees from any and all claims, actions, proceedings, damages, judgments, or costs, including attorney’s fees, against the City or its agents, officers, or employees, relating to the issuance of this permit including, but not limited to, any action to attack, set aside, void, challenge, or annul this development approval and any environmental document or decision. The City will promptly notify the Applicant of any claim, action, or proceeding. The City may elect to conduct its own defense, participate in its own defense, or obtain independent legal counsel in defense of any claim related to this indemnification. In the event of such election, the Applicant shall pay all of the costs related thereto, including without limitation reasonable attorney’s fees and costs. In the event of a disagreement between the City and Applicant regarding litigation issues, the City shall have the authority to control the litigation and make litigation related decisions, including, but not limited to, settlement or other disposition of the matter. However, the Applicant shall not be required to pay or perform any settlement unless such settlement is approved by the Applicant.
NOTICE TO APPLICANTS: Pursuant to Government Code Section 66020, you are hereby notified that the 90-day period to protest the imposition of the fees, dedications, reservations or other exactions described in this Resolution commences on the effective date of this resolution. To protest the imposition of any fee, dedications, reservations or other exactions described in this Resolution you must comply with the provisions of Government Code Section 66020. Generally the Resolution is effective upon expiration of the tenth day following the date of adoption of this Resolution, unless the resolution is appealed or called for review as provided in the Solana Beach Zoning Ordinance.
Resolution 2024-029
TE23-002 Las Brisas Time Extension
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Solana Beach, California, held on the 22th day of May, 2024, by the following vote:
AYES: Councilmembers –
NOES: Councilmembers –
ABSENT: Councilmembers –
ABSTAIN: Councilmembers –
______________________________
LESA HEEBNER, Mayor
APPROVED AS TO FORM: ATTEST:
______________________________ _______________________________ JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk TO:
FROM:
MEETING DATE:
ORIGINATING DEPT:
SUBJECT:
BACKGROUND:
STAFF REPORT
CITY OF SOLANA BEACH
Honorable Mayor and City Councilmembers
Gregory Wade, City Manager
February 9, 2022
Community Development Department
Request for a Conditional Use Permit for the
Construction of a Bluff Retention Device at 135 S. Sierra Avenue, Solana Beach. Case No: CUP 17-17-27;
Applicant: Las Brisas Homeowners Association
Resolution 2022-013.
The Applicant, the Las Brisas Homeowners Association, is requesting the approval of a Conditional Use Permit (CUP) to construct a Bluff Retention Device (BRO) consisting of a return wall that would extend from the top of the southern terminus of the existing seawall to the top of the bluff approximately 60 feet. The shotcrete wall would be constructed with a drilled pier/caisson design with structural concrete between piers. Exposed areas of the wall would be covered with hand sculpted, colored shotcrete to match the natural bluff surface and color. Areas of failed mid to upper bluff to the north of the wall will be reconstructed with geogrid and soil and covered with a hydroseed application that would utilize drought resistant, salt tolerant native species. The return wall would encapsulate and restore the bluff to an acceptable factor of safety for the existing residential structures onsite at 135 S. Sierra Avenue. The project would also allow public pedestrian access and public agency vehicle access near the top of the bluff that is currently closed.
This issue before the City Council is whether to approve, approve with conditions or deny the Applicant's request for a Conditional Use Permit (CUP) as contained in Resolution 2022-013 (Attachment 1 ).
DISCUSSION:
The existing approximately 2.19-acre property is developed with two four-story and one three-story condominium buildings, a one-story clubhouse, a swimming pool, a tennis court and associated underground utilities, retaining walls and vehicular and pedestrian hardscape and landscaping. At the closest point, the separation between the foundation of the CITY COUNCIL ACTION:
Resolution 2022-013
Approved 4/0/1 with Modification Absent: Zito
AGENDA ITEM# 8.1.
February 9 ,2022
CUP20-004 mod.
Las Brisas HOA
westernmost condominium building (building 3) and the coastal bluff edge is approximately 27 feet.
The lower coastal bluff is protected by an existing Bluff Retention Device (BRD)/seawall that is approximately 120 feet long and 35 feet high that is restrained with three rows of 75-footlong tiebacks and covered by hand-sculpted and colored shotcrete. Above the wall, geogrid reinforced fill was placed on top of the BRO to an approximate elevation of 45 feet above Mean Sea Level (MSL) to create a transition between the top of the BRO and the upper bluff.
The City Council approved a Conditional Use Permit to construct the BRO/Seawall in 2004 with the adoption of Resolution 2004-171.
In 2010, a significant failure occurred along the section of lower coastal bluff beginning at the southern terminus of the Las Brisas seawall and extending south approximately 70 feet across the unprotected bluff face along the Surfsong Condominium Association property line.
Undercut depths in the failure area had reached depths of 5 to 8 feet. The failure occurred along a joint at the base of the undercut area. According to the application, this failure resulted in a loss of 5 to 8 feet in depth of the coastal bluff adjacent to the Surfsong property.
The failure exposed approximately 7 to 8 feet of the southern end of the Las Brisas seawall.
In 2010, the Applicant requested and received approval of a Development Review Permit to construct a new segment of seawall that was an 8 foot long, 2.5 foot wide and 35 foot tall lateral return wall at the south end of the existing 120 foot long, 35 foot high seawall under an Emergency Permit. The Emergency Permit was issued by the California Coastal Commission as it was found to be the least amount of work necessary to restore the design parameters of the existing seawall and assure the factor of safety for the blufflop residences remains consistent with that provided by the seawall.
After the completion of the work, the Applicant was required to submit monitoring reports annually for the first three years and then every three years for the life of the BRO. In the 2012 monitoring report, it was noted that the exposure of the clean sand lens had expanded to the north and behind the seawall approximately seven feet north of the Las Brisas southern property line. The report indicated that this concern could expand further with time and on-going monitoring was advised. In the 2015 report, there was minor progression of erosion at the northern end of the seawall at the level of the exposed clean sand lens.
In 2019, there was a significant failure immediately south of the existing seawall. This failure has undergone progressive headward retreat since that time which has impacted a recorded easement for public agency vehicles, including emergency vehicles. As a result, public pedestrian access from Fletcher Cove across the Las Brisas Property into a public open space area on the adjacent Surfsong Condominium property to the south has been closed.
As indicated in the geotechnical reports provided by the Applicant and reviewed by the City's third-party geotechnical engineer, the proposed project would fully encapsulate the Las Brisas Property and return the property to a level of safety that would allow the City to reopen the rear of the property to pedestrian and public agency vehicular access. Project plans have been provided in Attachment 2.
February 9 ,2022
CUP20-004 mod.
Las Brisas HOA
The proposed project design is consistent with portions of Figure 3 and Figure 5, Appendix B included as Attachment 3 in the City's Certified Land Use Plan (LUP) which depicts the City's preferred engineered solution for a coastal bluff experiencing active lower, mid and upper bluff erosion.
This CUP application is before the City Council because the bluff area located below and along the project site has been determined to meet the criteria of imminent failure. The generally accepted factor of safety calculation for purposes of determining bluff stability and the potential for imminent failure is a factor of safety of 1 .2 or less. The factors of safety onsite range from 1.021 to 1.19, thus meeting the criteria for imminent failure.
The existing conditions are the result of several factors including, but not limited to, recent failures immediately adjacent to these properties and the exposure of the clean sand lens which both result in undermining of the existing seawall. Las Brisas was advised that this will be a reoccurring issue due to the continued failure of the exposed clean sand lens at the southerly terminus.
Table 1, below, demonstrates the existing factor of safety versus the factor of safety with proposed project improvements under both static and seismic conditions. A factor of safety equal to or less than 1 .0 represents a slope that is structurally failing whereby the bluff top principal structures are considered in "imminent danger" from potential bluff collapse and/or failure.
TABLE 1 - FACTOR OF SAFETY
Existing: With Project:
Structure Distance to bluff Static Static and Seismic
edge Factor of Safety Factor of Safety
Public
Easement/Public 0-1 0 feet 1.021 1.5/1.1 Agency Vehicle Access:
Las Brisas
Condominium 27 feet 1.19 1.5/1.1
BuildinQ 3:
Solana Beach Local Coastal Program
A consistency finding with the City's Local Coastal Program (LCP) Land Use Plan (LUP) is required for the proposed project. The City's LUP policies were certified to be consistent with Coastal Act Section 30235 which states: Revetments, breakwaters, groins, harbor channels, seawalls, cliff retaining walls, and other such construction that alters natural shoreline processes shall be permitted when required to serve coastal-dependent uses or to protect February 9 ,2022
CUP20-004 mod.
Las Brisas HOA
existing structures or public beaches in danger from erosion, and when designed to eliminate or mitigate adverse impacts on local shoreline sand supply.
Applicable City policies from the City's Certified LUP (as amended) are listed below followed by a discussion of how the project complies or has been conditioned to comply with the City's applicable and relevant LUP policies.
• Certified LUP Policy 4.26 (irrigation controls for bluff properties) • Certified LUP Policy 4.27 (use of drought resistant landscaping) • Certified LUP Policy 4.28 (stormwater runoff)
• Certified LUP Policy 4.32 (use of preferred engineering designs) • Certified LUP Policy 4.38 (aesthetics)
• Certified LUP Policy 4.39 (payment of mitigation fees) • Certified LUP Policy 4.45 (bluff retention device design) • Certified LUP Policy 4.49 (findings)
• Certified LUP Policy 4.50 (impact mitigation fees)
• Certified LUP Policy 4.54 (shoreline protection device maintenance) • Certified LUP Policy 4.55 (coordination among neighbors) • Certified LUP Policy 4.58 (development on the bluff)
Policy 4.26: With respect to bluff properties only, the City will require the removal or capping of any permanent irrigation system within 100 feet of the bluff edge in connection with issuance of discretionary permits for new development, redevelopment, or shoreline protection, or bluff erosion, unless the bluff property owner demonstrates to the satisfaction of the Public Works Director, or the CCC if the project is appealed, that such irrigation has no material impact on bluff erosion (e.g., watering hanging plants over hardscape which drains to the street).
• Project Compliance with Policy 4.26: The project has been conditioned to require the removal or capping of any permanent irrigation system within 100 feet of the bluff edge.
Policy 4.27: Require all bluff property landscaping for new development to consist of native, non-invasive, drought-tolerant, fire-resistant, and salt-tolerant species. • Project Compliance with Policy 4.27: After the return wall has been constructed, a reinforced soil slope (RSS) would be constructed to repair the mid and upper bluff.
The RSS would consist of geotextile grids that would be pinned to the slope with hand driven mechanical anchors and covered with soil and a hydroseed application that would utilize drought resistant, salt tolerant native species. The proposed hydroseed mix (Attachment 4) has been reviewed by the City's third-party landscape architect and have been found to be consistent with this policy.
Policy 4.28: All storm water drain systems that currently drain or previously drained towards the west over the bluff shall be capped. These systems should be redesigned to drain directly, or through a sump system, and then pumped to the street in compliance with SWP 2007-0001 and consistent with SUSMP requirements. This policy shall be implemented as a February 9 ,2022
CUP20-004 mod.
Las Brisas HOA
condition of approval for all discretionary permits issued for bluff properties or within 5 years of adoption of the LCP, whichever is sooner.
• Project Compliance with Policy 4.28: The project has been conditioned to require that all storm water drain systems that currently drain towards the west over the bluff be capped.
Policy 4.32: When bluff retention devices are unavoidable, encourage applicants to pursue preferred bluff retention designs as depicted in Appendix B of the LUP when required to protect an existing principal structure in danger from erosion. All future bluff retention device applications should utilize these designs as the basis of site-specific engineering drawings to ensure consistency with the LUP.
• Project Compliance with Policy 4.32: The project has been designed to be consistent with a mixture of the engineering requirements of Figure 3 and Figure 4 of LUP Appendix B.
Policy 4.38: Maximize the natural, aesthetic appeal and scenic beauty of the beaches and bluffs by avoiding and minimizing the size of bluff retention devices, preserving the maximum amount of unaltered or natural bluff face, and minimizing encroachment of the bluff retention device on the beach, to the extent feasible, while ensuring that any such bluff retention device accomplishes its intended purpose of protecting existing principal structures in danger from erosion.
• Project Compliance with Policy 4.38: The project has been designed to be the minimum size required to stabilize the bluff and protect the existing bluff top structures (Building 3) and the City infrastructure. An alternatives analysis was prepared for the proposed project and is contained in Attachment 5.
Policy 4.39: Provide for reasonable and feasible mitigation for the impacts of all bluff retention devices which consists of the payment of Sand Mitigation Fees and Public Recreation Fees to the City or other assessing agency.
• Project Compliance with Policy 4.39: The project has been conditioned to mitigate for all impacts related to sand supply and public recreation through the payment of impact mitigation fees.
Policy 4.45: The City has adopted preferred bluff retention solutions (see Appendix B) to streamline and expedite the City permit process for bluff retention devices. The preferred bluff retention solutions are designed to meet the following goals and objectives:
(1) Locate bluff retention devices as far landward as feasible; (2) Minimize alteration of the bluff face;
(3) Minimize visual impacts from public viewing areas; , (4) Minimize impacts to adjacent properties including public bluffs and beach area; and,
(5) Conduct annual visual inspection and maintenance as needed.
February 9 ,2022
CUP20-004 mod.
Las Brisas HOA
The bluff property owner's licensed Civil or Geotechnical Engineer must examine the device for use in the specific location and take responsibility for the design as the Engineer of Record.
The Bluff Property Owner shall arrange for and pay the costs of:
(1) The licensed Geotechnical or Civil Engineer;
(2) The bluff retention device;
(3) A bond to ensure completion of the bluff retention device; (4) Appropriate mitigation; and
(5) All necessary repairs, maintenance, and if needed removal. • Project Compliance with Policy 4.45: The project Applicant has paid for their licensed Geotechnical Engineer and will pay the construction costs for the bluff retention device and will be conditioned to pay the City a bond to ensure completion of the bluff retention device. Sand Supply and Public Recreation Impact Mitigation fees are required to be paid by the Applicant prior to issuance of the construction permit.
The Applicant will be responsible for all necessary future repairs and maintenance.
Policy 4.49: Coastal structures shall be approved by the City only if all the following applicable findings can be made and the stated criteria satisfied. The permit shall be valid until the currently existing structure requiring protection is redeveloped (per definition of Bluff Top Redevelopment in the LUP), is no longer present, or no longer requires a protective device, whichever occurs first and subject to an encroachment/removal agreement approved by the City.
(a) Based upon the advice and recommendation of a licensed Geotechnical or Civil Engineer, the City makes the findings set forth below.
(1) A bluff failure is imminent that would threaten a bluff home, city facility, city infrastructure, and/or other principal structure.
(2) The coastal structure is more likely than not to preclude the need for a larger coastal structure or upper bluff retention structure. Taking into consideration any applicable conditions of previous permit approvals for development at the subject site, a determination must be made based on a detailed alternatives analysis that none of the following alternatives to the coastal structure are currently feasible, including:
• A Seacave/Notch Infill;
• A smaller coastal structure; or
• Other remedial measures capable of protecting the bluff home, city facility, non-city-owned utilities, and/or city infrastructure, which might include or other non-beach and bluff face stabilizing measures, taking into account impacts on the near and long term integrity and appearance of the natural bluff face, and contiguous bluff properties;
(3) The bluff property owner did not create the necessity for the coastal structure by unreasonably failing to implement generally accepted erosion and drainage control measures, such as reasonable management of surface drainage, plantings and irrigation, or by otherwise unreasonably acting or failing to act with respect to the bluff property. In determining whether or not the bluff February 9 ,2022
CUP20-004 mod.
Las Brisas HOA
property owner's actions were reasonable, the City shall take into account whether or not the bluff property owner acted intentionally, with or without knowledge, and shall consider all other relevant credible scientific evidence, as well as, relevant facts and circumstances.
(4) The location, size, design and operational characteristics of the proposed coastal structure will not create a significant adverse effect on adjacent public or private property, natural resources, or public use of, or access to, the beach, beyond the environmental impact typically associated with a similar coastal structure and the coastal structure is the minimum size necessary to protect the principal structure, has been designed to minimize all environmental impacts, and provides mitigation for all coastal and environmental impacts, as provided for in this LCP.
(b) The coastal structure shall meet City Design Standards, which shall include the following criteria to ensure the coastal structure will be:
(1) Constructed to resemble as closely as possible the natural color, texture and form of the adjacent bluffs;
(2) Landscaped, contoured, maintained and repaired to blend in with the existing environment;
(3) Designed so that it will serve its primary purpose of protecting the bluff home or other principal structure, provided all other requirements under the implementing ordinances are satisfied, with minimal adverse impacts to the bluff face;
(4) Reduced in size and scope, to the extent feasible, without adversely impacting the applicant's bluff property and other properties; and
(5) Placed at the most feasible landward location considering the importance of preserving the maximum amount of natural bluff and ensuring adequate bluff stability to protect the bluff home, City facility, or City infrastructure.
(c) Mitigation for the impacts to shoreline and sand supply, public access and recreation and any other relevant coastal resource impacted by the coastal structure is required and shall be assessed in 20-year increments, starting with the building permit completion certification date. Property owners shall apply for a CDP amendment prior to expiration of each 20-year mitigation period, proposing mitigation for coastal resource impacts associated with retention of the coastal structure beyond the preceding 20-year mitigation period and shall include consideration of alternative feasible measures in which the permittee can modify the coastal structure to lessen the coastal structure's impacts in coastal resources. Monitoring reports to the City and the Coastal Commission shall be required every five years from the date of the CDP issuance until CDP expiration, which evaluate whether or not the coastal structure is still required to protect the existing structure it was designed to protect. The permittee is required to submit a CDP application to remove the authorized coastal structure within six months of a determination that the coastal structure is no longer required to protect the existing structure it was designed to protect.
February 9 ,2022
CUP20-004 mod.
Las Brisas HOA
• Project Compliance with Policy 4.49: An alternatives analysis is included in Attachment 5. Alternatives considered but rejected include: the proposed project, a seawall extension and no project. The City's third-party geotechnical engineer has confirmed that the project complies with, or has satisfied all of the findings required in, this policy (Attachment 6). Imminent bluff failure potential has been confirmed based on the factors of safety as shown in Table 1 shown previously in this report. The project has been designed consistent with the engineering design requirements of Figure 3 and Figure 4, Appendix B of the LUP. Mitigation has been imposed on the project as a condition of approval.
Policy 4.50: The bluff property owner shall pay for the cost of the coastal structure or Infill and pay a Sand Mitigation Fee and a Public Recreation Fee per LUP Policy 4.39. These mitigation fees are not intended to be duplicative with fees assessed by other agencies. It is anticipated the fees assessed as required by this LCP will be in conjunction with, and not duplicative of, the mitigation fees typically assessed by the CCC and the CSLC for impacts to coastal resources from shoreline protective devices.
• Project Compliance with Policy 4.50: The project will be required to mitigate all sand supply and public recreation impacts through the payment of mitigation fees to the City. The Applicant will also be required to obtain all necessary permits and approvals from the CCC and the CSLC prior to the City issuance of a construction permit.
Policy 4.54: Any bluff retention device shall be reasonably maintained and repaired by the bluff property owner on an "as needed" basis, at the bluff property owner's expense, in accordance with the implementing ordinances and any permit issued by the City. Any authorized assessing entity in which the project lies shall ensure such payments are reimbursed to the City if the bluff property owner fails to perform such work and the City elects to do so, subject to mandatory reimbursement. However, in all cases, after inspection, it is apparent that repair and maintenance is necessary, including maintenance of the color of the structures to ensure a continued match with the surrounding native bluffs, the bluff property owner or assessing entity shall contact the City or CCC office to determine whether permits are necessary, and, if necessary, shall subsequently apply for a coastal development permit for the required maintenance.
• Project Compliance with Policy 4.54: The project has been conditioned to include a requirement that the proposed project be repaired and maintained as needed for the life of the structure.
Policy 4.55: To achieve a well maintained, aesthetically pleasing, and safer shoreline, coordination among property owners regarding maintenance and repair of all bluff retention devices is strongly encouraged. This may a/so result in cost savings through the realization of economies of scale to achieve these goals by coordination through an assessing entity. All bluff retention devices existing as of the date of certification of the LCP, to the extent they do not conform to the requirements of the LCP, shall be deemed non-conforming. A bluff property owner may elect to conform his/her/its bluff property or bluff retention device to the LCP at any time if the City finds that an existing bluff retention device that is required to protect existing principal structures in danger from erosion is structurally unsound, is unsafe, February 9 ,2022
CUP20-004 mod.
Las Brisas HOA
or is materially jeopardizing contiguous private or public principal structures for which there is no other adequate and feasible solution, then the City may require reconstruction of the bluff retention device.
• Project Compliance with Policy 4.55: The subject CUP application was collectively submitted by the Las Brisas Condominium Homeowners Association.
Policy 4.58: Development on the bluffs, including the construction of a bluff retention device, shall include measures to ensure that:
• No stockpiling of dirt or construction materials shall occur on the beach; • All grading shall be properly covered and sandbags and/or ditches shall be used to prevent runoff and siltation;
• Measures to control erosion shall be implemented at the end of each day's work; • No machinery shall be allowed in the intertidal zone at any time to the extent feasible; • All construction debris shall be properly collected and removed from the beach.
Shotcretelconcrete shall be contained through the use of tarps or similar barriers that completely enclose the application area and that prevent shotcretelconcrete contact with beach sands and/or coastal waters.
• Project Compliance with Policy 4.58: Compliance with the requirements of this policy have been included as engineering conditions of approval.
Resolution No. 2022-013 (Attachment 1) contains citations to relevant policies of the City's LUP as conditions of approval.
Sand Mitigation Fee and Public Recreation Impact Mitigation Fee Deposit As a condition of their 2005 Coastal Development Permit (CDP) to construct the existing seawall below the Las Brisas Condominiums, the Applicant was required to pay a fee of $309,000 for, "the loss of sandy beach area and thus the loss of public recreational impacts" as well as "$22,977.36 for the loss of sand." The proposed lateral return wall would be constructed to retain the beach sands behind the existing seawall for which mitigation fees were already paid, therefore, no additional mitigation fees are required with this permit.
Compliance with Solana Beach Certified LUP Policies
Staff has evaluated the CUP application taking into account the following factors: (1) the relevant policies of the City's Certified LUP; (2) the conclusions drawn by the (a) City of Solana Beach's independent third-party geotechnical consultant CTE, INC. regarding the need for the project and the appropriateness of the proposed bluff stabilization devices and (b) the City of Solana Beach City Engineer conditions of approval; and (3) the Applicant's geotechnical reports and supplemental alternatives analysis (Attachments 7, 8, and 9).
After evaluating the Coastal Bluff Evaluation and Project Recommendations from TerraCosta Consulting Group, The Bluff Stabilization Engineering Design Report from GeoStabilization International and the Geotechnical Update and Response to comments from GeoSoils, Inc. provided by the Applicant and included in Attachments 7, 8, and 9, and the third-party review February 9 ,2022
CUP20-004 mod.
Las Brisas HOA
findings provided by the City's geotechnical engineering consultant, CTE, Inc., and the City Engineer, Staff concurs that the proposed project has met the standard of imminent danger.
Without the proposed project to stabilize the bluffs, the prospect of bluff failure could threaten the condominium building 3 and the pedestrian and public agency vehicular access is reasonably foreseeable within the next 12 months according to the factor of safety analysis.
Based on the foregoing information, City Staff finds that the proposed project could be found consistent with applicable LUP policies previously cited.
In addition to the required LUP findings, compliance with the Solana Beach Municipal Code is required to support issuance of a Conditional Use Permit.
Compliance with Solana Beach Municipal Code (SBMCl Findings 17.68.010 (Fl a. That the proposed use is in accord with the general plan, the general intent of this title, and the purposes of the zone in which the site is located. b. That the proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity.
c. That the proposed use complies with each of the applicable provisions of the zoning ordinance, unless a variance is granted pursuant to SBMC 17.68.020.
The proposed project is consistent with required finding (a), whereby shoreline protective devices are a structure/use allowed in the City to protect bluff top principal structures in danger of erosion.
The proposed project is consistent with the required finding (b) whereby the proposed project is needed to address an emergency condition whereby bluff failure has been confirmed to be imminent by Construction Testing and Engineering, Inc. (CTE, Inc. who is one of the City's on call third-party Geotechnical Engineering Firms).
The proposed project is consistent with the required finding (c) whereby the proposed project is consistent with the zoning ordinance which allows shoreline protection.
CEQA COMPLIANCE STATEMENT:
The proposed project qualifies as an emergency repair pursuant to the California Environmental Quality Act (CEQA) Public Resources Code §§ 21060.3, as evidenced by a licensed geotechnical engineer. Thus, this project is exempt from CEQA per 2022 State CEQA Guidelines §15269(b)(c).
FISCAL IMPACT: N/A
WORK PLAN: N/A
OPTIONS:
• Approve the proposed project and adopt Resolution 2022-013. • Deny the proposed project
• Provide alternative direction.
DEPARTMENT RECOMMENDATION:
Staff recommends that the City Council:
February 9 ,2022
CUP20-004 mod.
Las Brisas HOA
1. Conduct the Public Hearing: Open the public hearing, Report Council disclosures, receive public testimony, and close the public hearing
2. Find the Proposed Project exempt from the requirements of CEQA pursuant to 2022 State California CEQA Guidelines§ 15269 as emergency conditions exist on site.
3. Adopt Resolution 2022-013 condtionally approving a Conditional Use Permit Modification to construct a return wall that would consist of a drilled pier/caisson design with structural concrete betvveen piers, extend from the top of the southern terminus of the existing seawall to the top of the bluff, and would be covered with hand sculpted, colored shotcrete to match the adjacent natural bluff at 135 S. Sierra Avenue, Solana Be.ach.
CITY MANAGER'S RECOMMENDATION:
G_ egory Wade. City Manager
Attachments
1. Resolution 2022-013
2. Proposed Plans
ndation.
3. LUP Appendix B Figures 3 and 5
4 . Proposed Hydroseed Mix
5. Alternatives Anaysis
6. CTE. I NC. Third-Party Review Letters 1 and 2
7. Coastal Bluff Evaluetion and Project Recommendations. TerraCosta Consulting Group
8. Las Brisas Bluff Stabilization Engineering Design Manual. GeoStabilization International
9. Geotechnical Update and Response to Third-Party Geotechnical Review. GeoSoils. Inc.
RESOLUTION 2022-013
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SOLANA BEACH, CALIFORNIA, APPROVING A
CONDITIONAL USE PERMIT MODIFICATION FOR THE
CONSTRUCTION OF A MICROPILE REURN WALL, MID-AND
UPPER-BLUFF RESTORATION AND LANDSCAPING BELOW
135 S. SIERRA AVENUE IN SOLANA BEACH.
APPLICANTS: Las Brisas Homeowners Association
CASE NO.: CUP20-004
WHEREAS, the Applicant, the Las Brisas Homeowners Association (hereinafter referred to as "Applicant") has submitted an application for a Conditional Use Permit (CUP) pursuant to Title 17 (Zoning) of the Solana Beach Municipal Code (SBMC); and WHEREAS, the City Council adopted the Amended Local Coastal Program (LCP) Land Use Plan (LUP) in June 2014 with policies allowing for the construction of shoreline protective devices in the City as allowed by California Coastal Act Section 30235; and WHEREAS, a Coastal Bluff Evaluation and Basis of Design Report prepared by TerraCosta Consulting Group, Project Plans and Structural Calculations prepared by Soils Engineering Construction and supplemental technical materials prepared by GeoSoils, Inc. has been reviewed and confirmed by Geopacifica Geotechnical Consultants (Geopacifica), the City's third party independent geotechnical consultant, in a letter dated March 14, 2018 indicating the proposed project is required and has been designed consistent with all City requirements; and
WHEREAS, the existing static factors of safety onsite below the pedestrian/vehicular access area and Building 3 of Las Brisas are currently 1 .021 and 1 .19 respectively; and
WHEREAS, a factor of safety equal to or less than 1.0 represents a slope that is structurally failing whereby the generally accepted factor of safety calculation for purposes of determining bluff stability and the potential for imminent failure is a factor of safety of 1 .2 or less the bluff top principal structure (Building 3) and the public agency vehicular access and pedestrian access are considered in "imminent danger" from potential bluff collapse and/or failure; and
WHEREAS, at the duly noticed public hearing held on February 9, 2022, the City Council received and considered evidence concerning the proposed application as received; and
WHEREAS, the public hearing was conducted pursuant to the provisions of Solana Beach Municipal Code Section 17. 72.030; and
WHEREAS, the City Council of the City of Solana Beach found the proposed project exempt from the California Environmental Quality Act pursuant to State CEQA Guidelines§ 15269 as a documented geologic emergency exists onsite; and ATTACHMENT 1
Resolution 2022-013
CUP20-004 Mod.
Las Brisas HOA
WHEREAS, the proposed project will be designed to be located as far landward as possible, contoured, color matched and sculpted to match the surrounding bluff and will be maintained over the life of the structure consistent with the engineering design requirements depicted in Solana Beach Certified LCP LUP Appendix B, Figure 3; and WHEREAS, this decision is based upon the evidence contained in the subject application, testimony of Geopacifica, evidence presented at the hearing and any information the City Council gathered by viewing the site and the area as disclosed at the hearing.
NOW THEREFORE, the City Council of the City of Solana Beach, California, does resolve as follows:
1. That the foregoing recitations are true and correct.
2. That the project is categorically exempt from the requirements of CEQA pursuant to 2022 State California CEQA Guidelines 15269.
3. That the request for a Conditional Use Permit Modification to construct a return wall that would consist of a drilled pier/caisson design with structural concrete between piers that would extend from the top of the southern terminus of the existing seawall to the top of the bluff, would be covered with hand sculpted, colored shotcrete to match the adjacent natural bluff, would include and mid and upper bluff reconstruction and landscaping at 135 S. Sierra Avenue is conditionally approved based upon the following Findings and subject to the following Conditions:
4. FINDINGS
A. Compliance with Solana Beach Certified LCP LUP Policy Requirements: A consistency finding with the City's Local Coastal Program (LCP) Land Use Plan (LUP) is required for the proposed project. The City's LUP policies were certified to be consistent with Coastal Act Section 30235 which states:
Revetments, breakwaters, groins, harbor channels, seawalls, cliff retaining walls, and other such construction that alters natural shoreline processes shall be permitted when required to serve coastal-dependent uses or to protect existing structures or public beaches in danger from erosion, and when designed to eliminate or mitigate adverse impacts on local shoreline sand supply.
Applicable City policies from the City's Certified LUP (as amended) are listed below. The project complies or has been conditioned to comply with all applicable and relevant City LUP policies including:
Certified LUP Policy 4.26 (irrigation controls for bluff properties); Resolution 2022-013
CUP20-004 Mod.
Certified LUP Policy 4.27 (use of drought resistant landscaping); Certified LUP Policy 4.28 (stormwater runoff);
Certified LUP Policy 4.32 (use of preferred engineering designs); Certified LUP Policy 4.38 (aesthetics);
Certified LUP Policy 4.39 (payment of mitigation fees); Certified LUP Policy 4.45 (bluff retention device design); Certified LUP Policy 4.49 (findings);
Certified LUP Policy 4.50 (impact mitigation fees);
Las Brisas HOA
Certified LUP Policy 4.54 (shoreline protection device maintenance); Certified LUP Policy 4.55 (coordination among neighbors); and Certified LUP Policy 4.58 (development on the bluff).
B. Compliance with Solana Beach Municipal Code (SBMC) Findings 17.68.01 O:
a. That the proposed use is in accord with the general plan, the general intent of this title, and the purposes of the zone in which the site is located.
The proposed project is consistent with the required finding, whereby shoreline protective devices are a structure/use allowed in the City to protect bluff top principal structures in danger of erosion. b. That the proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity.
The proposed project is consistent with the required finding, whereby the proposed project is needed to address an emergency condition whereby bluff failure has been confirmed to be imminent by CTE Inc. (Construction Testing and Engineering, Inc. one of the City's third party geotechnical Engineering firms).
c. That the proposed use complies with each of the applicable provisions of the zoning ordinance, unless a variance is granted pursuant to SBMC
17.68.020.
The proposed project is consistent with the required finding, whereby the proposed project is consistent with the zoning ordinance which allows shoreline protection.
5. CONDITIONS
Prior to use or development of the property in reliance on this permit, the Applicant shall provide for and adhere to the following conditions:
A. Community Development Department Conditions:
Resolution 2022-013
CUP20-004 Mod.
Las Brisas HOA
I. Building Permit plans must be in substantial conformance with the plans presented to the City Council on February 9, 2022 and located in the project file with a submittal date of December 21, 2020.
II. The Applicant shall obtain required California Coastal Commission (CCC) approval of a Coastal Development Permit, waiver or exemption as determined necessary by the CCC, prior to the issuance of a grading or building permit.
Ill. The repairs will be constructed and maintained to incorporate an earth-like appearance which will resemble, as closely as possible, the color and texture of the surrounding bluffs.
IV. The Applicant shall remove or cap any permanent irrigation system within 100 feet of the bluff edge in connection with issuance of discretionary permits for new development, redevelopment, or shoreline protection, or bluff erosion, unless the bluff property owner demonstrates to the satisfaction of the Public Works Director, or the CCC if the project is appealed, that such irrigation has no material impact on bluff erosion (e.g., watering hanging plants over hardscape which drains to the street).
V. All storm water drain systems that currently drain or previously drained towards the west over the bluff shall be capped. These systems should be redesigned to drain directly, or through a sump system, and then pumped to the street in compliance with the current Regional Water Quality Control Board (RWQCB) Standard Urban Storm Water Mitigation Plan (SUSMP) requirements.
VI. Any bluff retention device shall be reasonably maintained and repaired by the bluff property owner on an "as needed" basis, at the bluff property owner's expense, in accordance with the implementing ordinances and any permit issued by the City. Any authorized assessing entity in which the project lies shall ensure such payments are reimbursed to the City if the bluff property owner fails to perform such work and the City elects to do so, subject to mandatory reimbursement. However, in all cases, after inspection, it is apparent that repair and maintenance is necessary, including maintenance of the color of the structures to ensure a continued match with the surrounding native bluffs, the bluff property owner or assessing entity shall contact the City or CCC office to determine whether permits are necessary and, if necessary, shall subsequently apply for a coastal development permit for the required maintenance.
VII. No stockpiling of dirt or construction materials shall occur on the beach.
Resolution 2022-013
CUP20-004 Mod.
Las Brisas HOA
VIII. All grading shall be properly covered and sandbags and/or ditches shall be used to prevent runoff and siltation.
IX. Measures to control erosion shall be implemented at the end of each day's work.
X. No machinery shall be allowed in the intertidal zone at any time to the extent feasible.
XI. All construction debris shall be properly collected and removed from the beach. Shotcrete/concrete shall be contained through the use of tarps or similar barriers that completely enclose the application area and that prevent shotcrete/concrete contact with beach sands and/or coastal waters.
XII. Temporary irrigation shall be periodically inspected every six months following planting to ensure planting success and to verify that irrigation is still required. At six month intervals, a report prepared by a licensed landscape architect detailing the status of the vegetation, an assessment on the condition of the temporary irrigation system, and provides supporting information on whether the temporary irrigation is still needed shall be provided to the City.
The City will issue a determination on the status of the temporary irrigation system upon reviewing the report. The City can require the removal of the temporary irrigation system at anytime. The temporary irrigation system may remain active and in place up to a maximum of 24 months at the approval of the City and must be removed once the plants have become established.
XIII. All required plantings will be maintained in good growing condition throughout the life of the project and, whenever necessary, shall be replaced with new plant materials to ensure continued compliance with the landscape plan.
XIV. The temporary irrigation system shall include redundant valve control/shut off valves to prevent any irrigation system leaks/failures.
B. Fire Department Conditions:
I. OBSTRUCTION OF ROADWAYS DURING CONSTRUCTION: All
roadways shall be a minimum of 20 feet in width during construction and maintained free and clear, including the parking of vehicles, in accordance with the California Fire Code and the Solana Beach Fire Department.
Resolution 2022-013
CUP20-004 Mod.
Las Brisas HOA
C. Engineering Department Conditions: Prior to obtaining any building or grading permits pursuant to this project, the Applicants shall:
I. Prior to obtaining any building or grading permits pursuant to this colored concrete seacave infill maintenance project, the Applicant shall:
a. Prepare, execute and record a declaration of restrictions on real property approved by the City Attorney whereby the applicant or the applicant's successors in interest to the property will construct and maintain the shoreline defense structure in accordance with Conditions of this approval.
b. The declaration of restrictions shall include an agreement by the Applicant to defend, indemnify, and hold harmless the City, its agents, officers, and employees from any and all claims, actions, proceedings, damages, judgments, or costs, including attorney's fees, against the City or its agents, officers, or employees, relating to any claim for damages from any injury to person or property caused by the shoreline defense structure or by its failure.
c. Said declaration of restrictions shall be acknowledged and recorded in the office of the County Recorder.
d. Per Policy 4.49 of the certified LUP, an Encroachment Maintenance and Removal Agreement is required when the
proposed Bluff Retention Device (BRO) is located in whole or in part on public land. In order to determine if an Encroachment Removal Agreement is required for this project, the applicant shall submit an engineering plan clearly showing the property lines, existing topography and the location of the proposed BRO. e. Obtain required California Coastal Commission Permits prior to the issuance of any structure and grading permits or present evidence that an emergency waiver has been granted.
f. Obtain any other permits or emergency waivers, which may be required from State and Federal agencies including the State Lands Commission and the U.S. Army Corps of Engineers.
g. The project shall be designed and shall provide appropriate data to confirm the submitted design to the satisfaction of the City Engineer. This shall include, but is not limited to, a geotechnical report.
Resolution 2022-013
CUP20-004 Mod.
Las Brisas HOA
h. The property owners shall post securities to guarantee proper care and use of the Fletcher Cove ramp. No construction materials to be off-loaded on the ramp, at the end of the ramp or any public property including streets and Fletcher Cove Park. No washing of equipment shall occur unless a containment system is properly utilized.
i. For all projects on which equipment is driven on the Fletcher Cove Beach Access Ramp, the access ramp and adjacent
parking lot must be swept daily to remove sand that has been tracked onto the ramp and parking lot. At least once a week, the access ramp and parking lot must be swept with a street sweeper that is capable of cleaning the streets and parking lots of paper, glass, dirt, silt, sand, rocks, litter and miscellaneous debris. The street sweeper shall be equipped with dual gutter brooms, and vacuum equipment may be used. If any sand is tracked outside the parking lot, these areas (including city streets) must also be cleaned weekly with a street sweeper. j. The property owners shall pay all inspection and plan check fees as required by the City.
k. Plans and specifications for the project shall be approved by the City Engineer in addition to approvals from the Director of Planning as may be required, and shall substantially conform to the plans submitted by the Applicant. All bluff stabilization devices shall produce a natural appearing bluff to the satisfaction of the City Engineer and the Community development director.
Project implementation shall provide a final product mimicking a naturally appearing bluff in terms of colors, textures, forms and angles.
I. A grading/drainage plan shall be prepared by a registered civil engineer in accordance with the current Grading Ordinance and be submitted to the City Engineer for approval and permit issuance.
m. Plans and specifications for the project shall be approved by the Planning Department prior to submittal to the Engineering Department.
n. The Applicant shall post with the City a Performance Bond equal to the full amount of the work to be completed to guarantee that once started, construction will be completed per approved plans. o. The Applicant shall submit a Certificate of Insurance naming the City of Solana Beach as an additional insured in the amount of Resolution 2022-013
CUP20-004 Mod.
Las Brisas HOA
$2,000,000 on a policy of general liability insurance issued by an insurance company licensed to do business in California, and meeting the requirements established by City Council resolution for insurance companies doing business with the City, covering injuries to persons and property during the construction period. p. The Applicant shall obtain a Special Use (Marine Safety) Permit specifying the conditions governing use of vehicles, use of the boat ramp, and entry upon and use of areas of the public beach for construction equipment and vehicles. Evidence of permit issuance shall be submitted to the City Engineer before issuance of the permit for the project.
q. The Applicant shall have on file evidence from the Captain of Marine Safety and City Engineer, City of Solana Beach, that arrangements have been made to satisfy the following criteria:
i. Prior to usage of the Solana Beach Fletcher Cove ramp or parking lot, a cash deposit, bond or other secured
agreement to cover the following impact charges shall be deposited:
• A six dollars ($6.00) per round trip vehicle charge for all construction related vehicles using the ramp.
• A three dollars ($3.00) per ton fee, or less if approved by the City Council, based on the estimated weight of
the vehicle and load for all vehicles in excess of¾ ton capacity, excluding any vehicles solely transporting
beach grade replenishment sand.
• A twenty-nine dollars ($29) per day charge for the first 30 days escalating to fifty-five dollars ($55) per day for the 31 st and subsequent days charge shall be collected to encourage a timely completion of all projects, unless otherwise modified for good cause by the City Council
or City Manager.
• Any damage caused to the Solana Beach Fletcher
Cove ramp and parking lot.
ii. At least one City of Solana Beach Lifeguard shall be contracted, at the Applicant's expense, through the Captain of Marine Safety, to monitor all activities in order to insure full compliance with the conditions of this permit. The lifeguard(s) shall be on duty at all times when any
construction activity takes place. Additional lifeguards may Resolution 2022-013
CUP20-004 Mod.
Las Brisas HOA
be required at the discretion of the Captain of Marine
Safety. In addition to the lifeguard staffing cost, the Applicant shall also pay a Marine Safety equipment use fee of four-dollar and sixty-four cents ($4.64) per hour, based on the number of the number of hours the lifeguards are contracted for the project.
iii. If construction access is from Fletcher Cove Park, precautions shall be taken to avoid damage to the beach access ramp during construction and repairs. If damage to the ramp occurs, it shall be repaired to a condition
equivalent to the condition at the start of construction activity to the satisfaction of the City of Solana Beach City Engineer. All City owned work areas including Fletcher
Cove Park and access ramp shall be videotaped prior to the commencement of the project. The videotape shall
establish the "as-is" condition. In any areas missed by the videotape, the City Engineer will determine "as-is" condition.
If access is from the State Park at the north end of
Solana Beach, precautions shall be taken to avoid
damage to the hard layer of fossiliferous sandstone
that forms the beach surface at the north end of the
coastal bluffs. Such access may necessitate State
approval. Proof of such access shall be provided to
the City Engineer before construction begins.
r. Beach quality sand from the excavation for the proposed project shall be deposited and spread on the beach in front of this site unless unique and/or inappropriate conditions are encountered.
The Applicant should reference this condition to other permitting agencies.
s. An encroachment permit from the Engineering Department is required if a crane, construction materials, etc. are envisioned to be stationed in the public right of way. The City does not guarantee that an encroachment permit will be approved. t. Any grout mixture used on the project that may be visible from the beach or surrounding areas shall be of similar color as the surrounding natural bluffs. Color samples shall be submitted and approved by the City prior to placing the grout.
u. The structure and any exposed construction shall mimic the natural contours, color and texture to the maximum extent practicable, as determined by the City Engineer and Community Development Director.
Resolution 2022-013
CUP20-004 Mod.
Las Brisas HOA
v. A carved, colored and textured facade on the face of the structure matching the adjacent bluff areas shall be constructed.
The fa9ade shall match the contours, both vertically and horizontally, and the texture of the adjacent natural bluffs to the maximum extent feasible. Coastal bluff colored grouting shall be used and shall be submitted to the City Engineer before approval of the plans. A test prism shall be cast and delivered to a testing lab during construction.
w. A qualified, licensed and insured contractor shall perform all required work as outlined by certified/registered engineering geologist or Registered Civil Engineer on the construction plans.
Special and general notes on said plans shall be followed to the satisfaction of the City Engineer or his designee.
x. Lateral pedestrian and Marine Safety vehicular access through the construction area, shall be provided past the site at all times, subject to high tides and safety issues. A 30-foot-wide safety/construction work zone shall be provided during work hours to separate the work zone from the open public beach. y. No construction activities may occur on the beach during the busier recreational season, which is defined as the period between Memorial Day and Labor Day of any year. The
contractor shall obtain approval from the City of Solana Beach Engineering and Marine Safety Departments regarding the use and timing of the Fletcher Cove parking lot and beach access ramp for all construction related access, staging and parking issues if such use becomes required.
II. Prior to Final Inspection of the project, the Applicant shall:
a. Submit certification to the City Engineer from the Geotechnical Engineer and the Civil Engineer of Record for the project that they have inspected the project and certify that it was constructed per the approved plan, specifying the date of the plan.
b. The applicant and/or contractor shall repair any damage caused to the Solana Beach property and facilities, including but not limited to, Fletcher Cove ramp and parking lot to the satisfaction of the City Engineer.
Ill. The Applicant shall provide for and adhere to the following Conditions:
Resolution 2022-013
CUP20-004 Mod.
Las Brisas HOA
a. All development on the site shall substantially conform to the final Conditional Use Permit Plan approved by the City Council. b. The property owner shall be responsible to immediately remove, in perpetuity, any graffiti or other markings should they appear on the project exterior face. If erosion exposes the steel rebar, the Applicant or their successor in interest shall arrange to apply a sculptor-coat of concrete over the exposed steel to match the natural bluff. The property owner shall be responsible for the removal of the structure or any portion thereof.
c. If requested by the City Manager or his designee, the property owner or their successor in interest shall install and maintain signage about unstable bluffs fronting their property.
d. The applicant shall provide "As-Built" plans and all certifications required to the City, before the City will release the performance bond as indicated in condition 1 .XII.
e. Pursuant to SBMC Section 7.34.100, Construction hours are limited to 7:00 a.m. to 7:00 p.m., Monday through Friday, and 8:00 a.m. to 7:00 p.m. on Saturday. No work is allowed on Sunday or holidays unless specifically approved pursuant to SBMC Section 7.34.100.B. Engines shall not be started, no construction-related materials shall be moved, or any other construction-related activities occur outside these hours. Work is not permitted on the beach on Saturdays without the written approval of the City Manager.
6. ENFORCEMENT: Pursuant to SBMC 17.72.120(B) failure to satisfy any and all of the above-mentioned conditions of approval is subject to the imposition of penalties as set forth in SBMC Chapters 1.1.6 and 1.18 in addition to any applicable revocation proceedings.
7. EXPIRATION: The Conditional Use Permit for the project will expire 24 months from the date of project approval unless the Applicant has obtained building/grading permits and commenced construction prior to that date, and diligently pursued construction to completion. An extension of the application may be granted by the City Council.
8. INDEMNIFICATION AGREEMENT: The Applicant shall defend, indemnify, and hold harmless the City, its agents, officers, and employees from any and all claims, actions, proceedings, damages, judgments, or costs, including attorney's fees, against the City or its agents, officers, or employees, relating to the issuance of this permit including, but not limited to, any action to attack, set aside, void, challenge, or annul this development approval and any environmental document or decision. The City will promptly notify Applicant of Resolution 2022-013
CUP20-004 Mod.
Las Brisas HOA
any claim, action, or proceeding. The City may elect to conduct its own defense, participate in its own defense, or obtain independent legal counsel in defense of any claim related to this indemnification. In the event of such election, Applicant shall pay all of the costs related thereto, including without limitation reasonable attorney's fees and costs. In the event of a disagreement between the City and Applicant regarding litigation issues, the City shall have the authority to control the litigation and make litigation related decisions, including, but not limited to, settlement or other disposition of the matter. However, the Applicant shall not be required to pay or perform any settlement unless such settlement is approved by Applicant.
9. NOTICE TO APPLICANT: Pursuant to Government Code Section 66020, you are hereby notified that the 90-day period to protest the imposition of the fees, dedications, reservations or other exactions described in this resolution commences on the effective date of this resolution. To protest the imposition of any fee, dedications, reservations or other exactions described in this resolution you must comply with the provisions of Government Code Section 66020.
Generally the resolution is effective upon expiration of the tenth day following the date of adoption of this resolution, unless the resolution is appealed or called for review as provided in the Solana Beach Zoning Ordinance.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Solana Beach, California, held on the 9th day of February 2022, by the following vote:
AYES: Councilmembers -
NOES: Councilmembers -
ABSENT: Councilmembers -
ABSTAIN: Councilmembers -
Lesa Heebner, Mayor
APPROVED AS TO FORM: ATTEST:
JOHANNA N. CANLAS, City Attorney ANGELA IVEY, City Clerk
BLUFF STABILIZATION PLANS
...
i ~· ~ ?
:z.' ,,. 'P t, .£ i ~ i p
;~APPROXIMATE
,PROJECT LOCATION
'LAT: 32.Ql029
LONG;.117.2f 413 ••
.. ~
VICINITY MAP
(liO T TO SCAL ~
LAS BRISAS CONDOMINIUMS
CITY OF SOLANA BEACH, CA
LAS BRISAS HOA
SHEET INDEX
NO. DESCRIPTION
C-01 COVER SHEET
C-02 GENERAL NOTES
C-03 GENERAL NOTES (CONT.)
C-04 EXISTING SITE &ACCESS PLAN
C-05 PROJECT SITE PLAN
C-06 SECTION VIEW· CUTOFF WALL
C-07 CUTOFF WALL DETAILS
C-08 MICR OPILE ANCHOR DETAILS
C-09 MICR OPILE CAP DETAILS
C-10 SECTION VIEW· RSS SYSTEM
C-11 PHASE II MITIGATION SECTION
C-12 MICR OPILE TESTING DETAILS
C-13 DRILL LOGS
GENERAL NOTES:
• GSI WILL BE THE LEAD FOR JOB SITE CONDITIONS AND SAFETY DURING CONSTRUCTION HOURS. THE JOB SITE WILL BE KEPT REASONABLY SECURE TO DETER UNAUTHORIZED ENTRY OR TAMPERING. HOWEVER, THOSE WHO ENTER THE CONSTRUCTION ZONE WITHOUT ENTRY WILL BE CONSIDERED TO BE TRESPASSING.
• GSI WILL USE UTILITY ONE CALL SERVICES, REQUEST UTILITY MAPS, AND REQUEST POTHOLING AS NEEDED TO LOCATE AND MARK KNOWN UTILITIES. .. DIG ALERT: DIAL 811, OR DIGALERT.ORG
.. CITY OF SOLANA BEACH PUBLIC WORKS 858-720-2470
• AT THE END OF EACH WORK DAY GSI WILL LEAE THE WORK AREA FREE OF HAZARDS,
AND PROVIDE TEMPORARY SIGNS, WARNING DEVICES, AND/OR BARRICADES, AS NEEDED.
• GSI WILL KEEP RECORDS OF THE DRILLING CONDITIONS, GROUT MIX SPECIFIC GRAVITY AND OTHER NOTES ON THESE PLANS AS NEEDED TO PROVIDE AS-BUil T INFORMATION TO THE OWNER AFTER PROJECT COMPLETION.
• GSI UNDERSTANDS THE WORKING HOURS FOR THIS SITE TO BE 7:00 A.M. AND 7 P.M.
EACH DAY, MONDAY THROUGH FRIDAY.
• GSI WILL NOTIFY THE CITY OF SOLANA BEACH AT (858) 720-2470, AT LEAST 24 HOURS BEFORE THE FIRST DAY OR THE PROJECT.
STANDARD REQUIREMENTS
GSI WILL PERFORM THE WORK IN GENERAL ACCORDANCE WITH THE LATEST EDITION AND SUPPLEMENTS OF THE "STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION,"
SAN DIEGO REGIONAL STANDARD DRAWINGS AND CITY OF SOLANA BEACH ENGINEERING CONSTRUCTION STANDARDS.
ASSESSOR PARCEL NUMBERS ADDRESSES
298-010-54-0001 THROUGH -36 135 S SIERRA AVE
EROSION CONTROL NOTES:
• GSI WILL PLACE SILT FENCE AT THE TOE OF THE SLOPE (TOP OF THE SEA WALL) TO LIMIT ERODED SOILS FROM REACHING THE PUBLIC BEACH.
• GSI WILL USE DIKES, BERMS OR TRENCHES TO LIMIT STORMWATER WATER FLOWING OVER CRESTS OF THE SLOPE.
• GSI WILL USE WATER AS NEEDED TO MINIMIZE AIR BORNE DUST ON THE SITE.
HOUSE KEEPING:
• THE SITE WILL BE ORGANIZED AND CLEAR OF ANY TRASH OR DEBRIS. ALL TRASH WILL BE PLACED IN A PROPER CONTAINER AND REMOVED AT THE END OF EACH WORK DAY.
SAFETY:
• ALL SAFETY PLANS FOR LIFTING, HEARING, DUST CONTROL, PPE ETC. WILL BE IN PLACE AND FOLLOWED ACCORDINGLY. PPE INCLUDES SAFETY VEST, STEEL TOED SHOES,
HARD HAT, SAFETY GLASSES, RESPIRATOR DURING DUST PRODUCING ACTIVITIES, AND GLOVES.
• GSI WILL GENERATE A SITE SPECIFIC HEAL TH AND SAFETY PLAN THAT MUST BE
REVIEWED AND SIGNED BY ALL GSI EMPLOYEES, SUBCONTRACTORS, AND VISITORS TO THE SITE.
• GSI WILL LEAD A DAILY TAILGATE MEETING TO REVIEW JOB HAZARD ANALYSIS "JHA" FOR EACH OF THE DAYS ANTICIPATED TASKS.
EMPLOYEE CERTIFICATIONS:
• ACI SHOTCRETE NOZZLEMEN CERTIFICATION
• 10-HOUR OCCUPATIONAL SAFETY AND HEALTH TRAINING COURSE IN CONSTRUCTION
SAFETY & HEALTH
• AMERICAN RED CROSS STANDARD FIRST AID TRAINING
SHEET REVISIONS PROJECT NAME:
ANTICIPATED CONSTRUCTION SEQUENCE/WORK SCHEDULE:
1. DELINEATE LIMITS OF STABILIZATION. NOTIFY LOCAL UTILITIES PROVIDERS TO LOCATE AND MARK POTENTIAL UNDERGROUND FACILITIES. DAYLIGHTING OF UTILITIES IN POTENTIAL CONFLICT, AS NECESSARY (BY OTHERS).
2. PREPARE THE WORK AREA FOR MICROPILE INSTALLATION AND CUTOFF WALL
CONSTRUCTION
2.1. INSTALL EROSION CONTROL FENCE AT THE TOP OF THE EXISTING SEAWALL TO LIMIT SOIL EROSION DURING CONSTRUCTION.
2.2. MINOR RE-SHAPING OF EXISTING SCARP AND SURROUNDING GRADES MAY BE REINFORCING STEEL PLACEMENT:
• RIENFORCEEING STEEL FOR THIS PROJECT SHALL BE EPOXY COATED OR GALVANZIED. • WELDED WIRE MESH WILL BE PLACED ON BOTH SIDES OF THE EXTENDED 51 mm MICROPILES AS SHOWN IN THESE DRAWINGS.
• NO. 5 REBAR WILL BE TIED TO THE SOUTH WIRE MESH. FOLLOW SPACING AND SPLICE LENGTHS AS SHOWN IN THESE DRAWINGS.
• NO. 5 REBAR WILL ALSO BE USED FOR THE MICROPILE CAP. FOLLOW SPACING AND SPLICE LENGTHS AS SHOWN IN THESE DRAWINGS.
NEEDED TO FACILITATE CONSTRUCTION OF THE MICROPILE CUTOFF WALL. MICROPILE CAP PLATES:
2.3. MARK THE LOCATIONS OF THE PROPOSED STABILIZATION ELEMENTS WITH SURVEY • 6" X 6" X 1/2" STEEL BEARING PLATES WILL BE PLACED OVER THE MICROPILES IN THE MARKING PAINT. MICROPILE CAP AND ATTACHED WITH A HEX NUT TOP AND BOTTOM. IF THE MICROPILES
3. INSTALLATION OF MICROPILE ELEMENTS. EACH ELEMENT WILL BE GROUTED DURING EXTEND BEYOND THE TOP HEX NUTS, THEY WILL BE TRIMMED.
DRILLING UNLESS DIRECTED OTHERWISE BY GSI ENGINEER.
4. CONSTRUCT THE CUTOFF WALL:
4.1 . PLACE REINFORCING STEEL AND DRAIN STRIPS PER THESE DRAWINGS.
4.2. USE WOOD OR SIMILAR FORMWORK ON THE NORTH SIDE OF THE CUTOFF WALL TO FACILITATE SHOTCRETE PLACEMENT.
4.3. PLACE SHOTCRETE FROM THE BOTTOM UP TO THE REQUIRED THICKNESS DETAILED IN THESE PLANS.
5. PREPARE AREA NORTH OF THE CUTOFF WALL FOR REINFORCED SOIL SLOPE SYSTEM INSTALLATION. MINOR GRUBBING AND GRADING MAY BE NECESSARY.
6. INSTALL REINFORCED SOIL SLOPE SYSTEM IN LIFTS AS DETAILED IN THESE DRAWINGS AND PER THE MANUFACTURER INSTALLATION PROCEDURES.
7. SITE CLEANUP AND DEMOBILIZATION FROM SITE.
7.1. CONCRETE, GROUT, AND OTHER CONSTRUCTION DEBRIS WILL BE REMOVED PERIODICALLY THROUGHOUT THE WORK.
7.2. FINAL CLEANUP OF THE SITE TO INCLUDE REASONABLE HAND CLEANING METHODS LIKE SWEEPING, SPRAYING WITH WATER AND REMOVAL OF TRASH AND DEBRIS.
MAJOR LANDSCAPING SHOULD NOT BE NEEDED IF PROPER ACCESS IS GRANTED TO GSI THROUGHOUT THE PROJECT.
SIZE AND TYPE OF STABILIZATION ELEMENTS:
• THE MICROPILE ELEMENTS SHALL CONSIST OF 51 mm NOMINAL DIAMETER, SELF-DRILLING HOLLOW BAR. SACRIFICIAL DRILL BITS WILL BE ATTACHED TO THE STABILIZATION ELEMENT PRIOR TO INSTALLATION.
• SACRIFICIAL DRILL BITS ARE NOT PERMANENTLY INCORPORATED INTO THE PROJECT
AND MAY BE REMOVED AFTER DRILLING OR LEFT AT THE PROJECT FOR THE CONTRACTOR'S CONVENIENCE. SACRIFICIAL DRILL BITS ARE NOT END PRODUCTS.
SACRIFICIAL DRILL BITS ARE NOT PRODUCED IN THE UNITED STATES. • GSI ENGINEER MAY ELECT TO MODIFY THE TYPE OF STABILIZATION ELEMENT, LENGTH OR INSTALLATION METHOD, DEPENDING ON ACTUAL DRILLING CONDITIONS.
FACING AND DRAINAGE SYSTEM:
• DRAIN STRIPS WILL BE PROVIDED AND INSTALLED APPROX. EVERY SIX-FEET ALONG THE NORTH SIDE OF THE CUTOFF WALL .. THE DRAIN STRIPS SHALL BE PLACED WITH THE GEOTEXTILE SIDE AGAINST THE FORMWORK.
• DRAIN STRIPS WILL BE CONTINUOUS AND ANY SPLICES SHALL BE MADE WITH A ONE-FOOT MINIMUM OVERLAP SUCH THAT THE FLOW OF WATER IS NOT IMPEDED. • DRAIN STRIPS SHALL EXTEND BEYOND THE FACE OF THE SHOTCRETE AT THE DOWNHILL FACE.
• DRAIN STRIPS SHALL BE MINIMUM 12" WIDE.
REINFORCED SOIL SLOPE (RSS) SYSTEM:
HIGH PERFORMANCE TURF REINFORCEMENT MAT (HPTRM)
•
•
•
•
MATERIAL IS THREE-DIMENSIONAL, LOFTY WOVEN POLYPROPYLENE HPTRM
MATRIX COMPOSED OF TRILOBAL MONOFILAMENT YARNS WOVEN INTO UNIFORM
CONFIGURATION OF RESILIENT PYRAMID-LIKE PROJECTIONS THAT MINIMIZE WATERING REQUIREMENTS WHILE ENHANCING VEGETATION ESTABLISHMENT.
MUST BE A HOMOGENEOUS MATRIX, AND NOT COMPRISED OF LAYERS, COMPOSITES,
OR DISCONTINUOUS MATERIALS, OR OTHERWISE LOOSELY HELD TOGETHER BY STITCHED OR GLUED NETTING.
THE HPTRM SHOULD MEET THE FOLLOWING VALUES:
PROPERTY TEST METHOD UNITS MINIMUM
REQUIREMENT
THICKNESS ASTM D6525 IN 04
LIGHT PENETRATION ASTM D6567 % 10
TENSILE STRENGHT ASTM D6818 LB/FT 4000 X 3000
TENSILE ELONGATION ASTM D6818 % 40X 35
RESILIENCY ASTM D6524 % 80
FLEXIBILITY ASTM D6575 IN-LB 0.534
UV RESISTANCE ASTM 4355 % 90 AT 6000 hrs
• WOOD OR PLASTIC STAKES, OR STEEL PINS ARE USED TO PIN-DOWN THE GEOTEXTILE
NEAR THE BACK OF THE REINFORCEMENT ZONE TO HOLD THE GEOTEXTILE TAUT WHILE ALIGNING THE WALL FACE AND PLACING SOIL BACKFILL. THESE ARE INSTALLED AS NEEDED ALONG THE HPTRM, BUT AT A FREQUENCY NO LESS THAN 1 PER 6 LINEAL FEET. THE STAKES OR PINS SHALL BE 9 TO 12 IN LONG.
• BACKFILL WILL COMPRISE GENERAL FILL WITH A UNIFIED SOIL CLASSIFICATION SYSTEM DESIGNATION OF SILTY SAND (SM).
.. THE SM MATERIAL WILL CONSIST OF INERT EARTH MATERIALS WITH LESS THAN 3% ORGANICS OR OTHER DELETERIOUS SUBSTANCES.
.. FILL WILL BE PLACED IN UNIFORM, MAXIMUM 12-INCH LIFTS. .. FILL IN THE UPPER 12 INCHES OF THE GRADED SLOPE FACE WILL NOT BE COMPACTED DUE TO LACK OF CONFINEMENT.
.. FILL BEHIND THE UPPER 12 INCHES OF THE GRADED SLOPE FACE WILL BE COMPACTED TO AT LEAST 90% OF THE MATERIALS MAXIMUM DRY DENSITY AND BE
UNIFORMLY MOISTURE CONDITIONED TO AT LEAST THE OPTIMUM MOISTURE CONTENT AS DETERMINED BY ASTM D1557.
DATE DESCRIPTION NO
09/01/21 ISSUED FOR REVIEW IFR
10/20/21 ISSUED FOR PERMIT IFP LAS BRISAS CONDOMINIUMS
1----+--------------+-----1 SHEET TITLE:
THIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WTH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE
TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL (GSI) THE DESIGN IS ONLY VALID IF
CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR
DRAWN BY
MAC
GENERAL NOTES
CHECKED BY: DATE:
JDR 10/20/21
PROJECT NUMBER:
210487CA01
SHEET
C-02
lie o!ita biliza tio n Inte rna tio n a l®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
RSS ANCHOR DETAILS
TYPE B3 ANCHOR PROPERTIES
Component Materials
Anchor Head
Cable Tendon
Material Composition
Hot Dip Galvanized Ductile
Iron
Ga Iva nized St eel
Physical Properties
t>.~ 1n x i84 m x 2.36 In
(163.3 mm x 46. 7 mm x 59.9 mm)
Bearino Area: 10.3 in• 166.5 cm•l
Diameter: 0.1875 In (4.8 mm)
Lower Termination Aluminum Length: 0.65 in (16.5 mm), Wal l Thickness: 0.11 in (2.8 mm) Load Bearing Plate Zinc-Alum inum
5.98 in x 6.6 In x 0. 75 In
(15i9 mm x 167.6 mm x 19.1 mm)
Bearing Area: 17.43 in• (112.5 cm')
Top Termination Zinc-Alum inum
Circumferential Tripple Wedge Grip Assembly to Eliminate cable Pinch Points Grip to Cable Conwct Surface Area: 0.505 in2 (3.3 cm 2) Grip to Cable Contact Ratio: 97% of Cable Diameter
Performance Properties
Ult imate Assembly Strength 2800 lb (12.46 kN) Typical Working Load I 2000 lb (8.9 kN) Ultimate Cable Strength 3700 lb (16.46 kN) Embedment Depth I 6-12 ft (1.83-3.66 m) SHOTCRETE MIX DESIGN:
• SHOTCRETE SHALL COMPLY WITH THE REQUIREMENTS OF ACI 506.2, "SPECIFICATIONS FOR MATERIALS, PROPORTIONING AND APPLICATION OF SHOTCRETE", EXCEPT AS OTHERWISE SPECIFIED. SHOTCRETING CONSISTS OF APPLYING ONE OR MORE LAYERS
OF CONCRETE CONVEYED THROUGH A HOSE PNEUMATICALLY PROJECTED AT A HIGH VELOCITY AGAINST A PREPARED SURFACE.
• THE WET-MIX PROCESS CONSISTS OF THOROUGHLY MIXING ALL THE INGREDIENTS,
INTRODUCING THE MIXTURE INTO THE DELIVERY EQUIPMENT AND DELIVERING IT, BY POSITIVE DISPLACEMENT, TO THE NOZZLE. AIR JET THE WET-MIX SHOTCRETE FROM THE NOZZLE AT HIGH VELOCITY ONTO THE SURFACE.
• GSI STANDARD SHOTCRETE MIX DESIGN SHALL BE USED UNLESS SHOTCRETE TEMPERATURES ARE ANTICIPATED TO REACH AND/OR EXCEED 85°F. IN THIS EVENT, GSI HOT WEATHER MIX MAY BE USED. SET TIME CONTROLLING ADDITIVES (I.E. HYDRATION
STABILIZERS, RETARDERS) MAY BE USED PER THE MANUFACTURER SPECIFICATIONS AND UNDER THE DIRECTION OF A GSI ENGINEER.
GS/ STANDARD SHOTCRETE MIX DESIGN (PER Yfi3)
MATERIAL DESCRIPTION WEIGHT (LBS)
AGGREGATE NO. 1 i" ROCK, AASHTO M80, CLASS B 650
AGGREGATE NO. 2 CONCRETE SAND, CLEAN, NATURAL 1800
AIR 6% TOTAL --
WATER CLEAN AND POTABLE 300
FLY ASH TYPE FOR C 150
CEMENT TYPEV 750
TOTAL -- 3710
GS/ HOT WEATHER SHOTCRETE MIX DESIGN (PER YD3
)
MATERIAL DESCRIPTION WEIGHT (LBS.)
AGGREGATE NO. 1 i" ROCK, AASHTO M80, CLASS B 600
AGGREGATE NO. 2 CONCRETE SAND, CLEAN, NATURAL 1800
AIR 6% TOTAL --
WATER CLEAN AND POTABLE 315
FLY ASH TYPE FOR C 300
CEMENT TYPEV 700
TOTAL -- 3710
SHEET REVISIONS PROJECT NAME:
SHOTCRETE APPLICATION:
• SHOTCRETE APPLICATION WILL GENERALLY COMPLY WITH ACI 506.2-13 UNLESS DIRECTED BY GSI ENGINEER OR THEIR DESIGNATED REPRESENTATIVE. • SHOTCRETE WILL BE PLACED FROM THE LOWER PART OF THE AREA UPWARDS TO PREVENT ACCUMULATION OF REBOUND. THE NOZZLE WILL BE ORIENTED A PROPER
DISTANCE FROM AND APPROXIMATELY PERPENDICULAR TO THE WORKING FACE SO THAT REBOUND WILL BE MINIMAL AND COMPACTION WILL BE MAXIMIZED. • CARE WILL BE TAKEN WHILE ENCASING REINFORCING STEEL AND MESH TO KEEP THE
FRONT FACE OF THE REINFORCEMENT CLEAN DURING PLACEMENT OPERATIONS, SO
THAT SHOTCRETE BUILDS UP FROM BEHIND, TO ENCASE THE REINFORCEMENT AND PREVENT VOIDS OR POCKETS FROM FORMING.
• SHOTCRETE THICKNESS TOLERANCE SHALL BE MINUS ONE INCH - PLUS TWO INCHES.
GROUT MIX DESIGN:
• STANDARD GROUT MIX DESIGN TO BE USED IN SOIL DRILLING. • IF SLOWER DRILLING IS EXPERIENCED WHILE DRILLING IN ROCK GSI ENGINEERS MAY APPROVE USE OF DRILLING GROUT MIX DESIGN. UPON COMPLETION OF DRILLING TO
SPECIFIED DEPTH WITH DRILLING GROUT MIX HOLE SHOULD BE FLUSHED WITH
STANDARD GROUT MIX AND NAIL HOLE SWABBED TO AID IN DRILLING GROUT MIX REPLACEMENT.
• IF VOIDS ARE ENCOUNTERED AND GROUT LOSS IS EXPERIENCED CONTACT GSI
ENGINEERS AND CUT OFF GROUT PUMPING FOR THAT ELEMENT WHEN DRILLING DEPTH IS REACHED AND A TOTAL OF 3 BAGS OF GROUT SLURRY PER 10' STICK OF BAR HAS BEEN USED.
• THE GROUT WILL BE A TYPE I/11/V PORTLAND CEMENT. THE WATER/CEMENT RATIO WILL BE 0.5 TO 0.6. NO ADDITIONAL AGGREGATE OR ADMIXTURES WILL BE ADDED TO THE GROUT.
STANDARD GROUT MIX DESIGN
MATERIAL WEIGHT (LBS.) VOLUME (FT3) FIELD UNIT VOLUME
WATER 235-282 3.8-4.5 28 - 34 GALLONS
CEMENT (TYPE 1/11) 470 2.4 5 BAGS (94 LBS.)
TOTAL UNIT 705 - 752 6.1-6.9 --
W/C RATIO -- -- 0.5 - 0.6
SPECIFIC GRAVITY -- -- 1.84-1.75
DRILLING GROUT MIX DESIGN
MATERIAL WEIGHT (LBS.) VOLUME (FT3) FIELD UNIT VOLUME
WATER 235-282 3.8-4.5 28 - 34 GALLONS
CEMENT (TYPE 1/11) 188 0.9 2 BAGS (94 LBS.)
TOTAL UNIT 423 - 470 4.7 - 5.5 --
W/C RATIO -- -- 1.25 - 1.5
SPECIFIC GRAVITY -- -- 1.44-1.38
DATE DESCRIPTION NO
09/01/21 ISSUED FOR REVIEW IFR
10/20/21 ISSUED FOR PERMIT IFP LAS BRISAS CONDOMINIUMS
1-----+----------------------1 SHEET TITLE:
THIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE
TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IF
CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR DRAWN BY:
MAC
GENERAL NOTES (CONT)
CHECKED BY: DATE:
JDR 10/20/21
PROJECT NUMBER:
210487CA01
SHEET
C-03
QUALITY CONTROL:
• GSI WILL CONDUCT OR OBTAIN QUALIFIED PERSONNEL TO CONDUCT THE FOLLOWING QUALITY CONTROL TESTING DURING THE PROJECT.
QUALITY CONTROL SCHEDULE
DESCRIPTION
DILL LOGS
PROOF NAIL TEST
MUD BALANCE
READINGS (SPECIFIC
GRAVITY)
GROUT CUBES
SHOTCRETE PANELS
FREQUENCY
EVERY MICROPILE
5% OF PRODUCTION NAILS,
TEST AFTER 48 HRS
ONCE EACH DAY OF
GROUTING
1 SET OF 3 CUBES PER
EVERY 10 PILES INSTALLED
2 PRODUCTION PANELS
THROUGHOUT PROJECT
lieo!it abiliza tio n Intern a tio n a l ®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
REFERENCE/ CRITERIA
RECORD DATA PER SHEET
C-14
FHWA 05-039, 2005
SEE SHEET C-03 & C-14 FOR
MIX DESIGN AND DATA LOG
ASTM C-109/AASHTO T106. 3, 7
& 28 DAY STRENGTH. 4000 PSI
28-DAY.
ASTM C1140, 1500 PSI. 3, 7 & 28
DAY STRENGTH. 5000 PSI
28-DAY.
OVERSPRAY BARRIER
(SEE NOTE 5)
...
EROSION CONTROL BMPs
WILL BE PLACED AT THE
SEAWALL WITHIN THE
CONSTRUCTION ZONE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I - - ----- - -- .J. - J
30' WIDE CONSTRUCTION
WORK ZONE (SEE NOTE 4)
SHEET REVISIONS PROJECT NAME:
DATE DESCRIPTION NO
09/01/21 ISSUED FOR REVIEW IFR
10/20/21 ISSUED FOR PERMIT IFP
l------+------------+-------1 SHEET TITLE:
THIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE
TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IF
CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR DRAWN BY:
MAC
6' PAST THE END OF THE
SEAWALL END OF
CONSTRUCTION ZONE
LAS BRISAS CONDOMINIUMS
EXISTING SITE & ACCESS PLAN
CHECKED BY: DATE:
JDR 10/20/21
PROJECT NUMBER:
210487CA01
SHEET
...
••
C-04
NOTES:
1. BACKGROUND IMAGE OBTAINED FROM GSI DRONE
FLIGHT AERIAL IMAGERY, FLOWN ON 8/25/21.
EXISTING TOPOGRAPHY DATA OBTAINED FROM
PASCO LARET SUITER & ASSOCIATES, PLSA JOB
#2710.
2. CONSTRUCTION ACCESS CORRIDOR IS LOCATED
ALONG THE SOUTH SIDE OF THE LAS BRISAS
CONDOMINIUMS. CARE SHOULD BE TAKEN TO
LIMIT IMPACT TO THE CONDOMINIUM AND PUBLIC
ACCESS IN THE AREA
3. CONSTRUCTION MATERIALS AND EQUIPMENT
SHALL BE MOVED FROM THE STAGING SITE AND
RESTORE THE STAGING TO ITS
PRIOR-TO-CONSTRUCTION CONDITION WITHIN 72
HRS FOLLOWING COMPLETION OF THE PROJECT.
4. GSI TO PROVIDE CONSTRUCTION BARRIER
DURING WORKING HOURS TO SEPARATE WORK
ZONE FROM OPEN PUBLIC BEACH. LATERAL
PUBLIC ACCESS SHALL BE PROVIDED PAST THE
SITE AT ALL TIMES.
5. GSI WILL USE A PLASTIC OR SIMILAR BARRIER TO
PROTECT THE BUILDING FROM SHOTCRETE
OVERSPRAY. ANTICIPATE DRAPING FROM THE
3RD DECK TO GROUND LEVEL.
0 lieo!itabilization International®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
w
♦~ ~
10' 20' 40'
REINFORCED
REINFORCED Ml
POST-CONSTRUCTION
GEOGRID REINFORCED SLOPE
ROXIMATE LOCA
EXISTING TIED-BAG
. ELEV. 35'
SHEET REVISIONS PROJECT NAME:
DATE DESCRIPTION NO
09/01/21 ISSUED FOR REVIEW IFR
10/20/21 ISSUED FOR PERMIT IFP
1----1---------------+----t SHEET TITLE:
THl~gi;E'6~~~~ ~~~N~~~~~1~~~~~y1~~iRT:!\~i~ i:o~~~~~~i~~;~i/i~~~HIS ORA WN BY: TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY coN~~~~~~~ !~~~~~~~~;:; ~~~~1 ~~
1 /TsT~G~H~~~tE~ iuNi;ovN~~~;TOR MAC
'r .;"
r "'
DRILL LOWER MICROPILE
INTO EXISTING SEAWALL
RETURN TO REPAIR
BREACH IN WALL.
LAS BRISAS CONDOMINIUMS
PROJECT SITE PLAN
CHECKED BY: DATE:
JDR 10/20/21
PROJECT NUMBER:
210487CA01
SHEET
C-05
••
NOTES:
1. BACKGROUND IMAGE OBTAINED FROM GSI
DRONE FLIGHT ON 8/25/21. EXISTING
TOPOGRAPHY DATA OBTAINED FROM
PASCO LARET SUITER & ASSOCIATES,
PLSA JOB #2710.
w
♦~ ~
0 10' 20' 40'
lieo!itabilization International®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
PROPOSED
SHOTCRETE WALL
KEY IN SHOTCRETE
BASE MIN. 6" BELOW
SURROUNDING GRADE
EXISTING
SEAWALL
DOWELL REBAR, MIN
12", AT END STATION
INTO EXISTING
SEAWALL
SHOTCRETE CONNECTION
TO EXISTING SEAWALL
~ MICROPILE CAP TO
~ SHOTCRETE CONNECTION
STRIP DRAINS SPACED EVERY 6', @ SLOT DRAINS INTO 4" CORRUGATED PIPE,
SHOOT DRAIN INTO THE BASE OF SHOTCRETE
WALL AND DAYLIGHT TOWARDS THE BEACH
BLUFF SURFACE SOUTH OF
PROPOSED WALL ALIGNMENT
REINFORCED SHOTCRETE
TO OVERLAP EXISTING
SEAWALL MIN 12"
@ A BETWEEN -1
18" SPACING
C-07 MICROPILES I
@ SOLID HATCH INDICATES
~ STRUCTURALSHOTCRETE
REINFORCED SHOTCRETE
CONNECTION TO EXISTING
SEAWALL.
4" CORRUGATED PIPE OUTLET TO
DAYLIGHT AND DRAIN WATER OVER
TOP OF EXISTING SEAWALL
REBAR DOWELING I
I
EXISTING CONCRETE ~ :
SEAWALL RETURN ~
EMBEDME~::S=
RETURN WALL UNKNOWN
~ SHEET REVISIONS PROJECT NAME:
DATE DESCRIPTION NO
09/01/21 ISSUED FOR REVIEW IFR
10/20/21 ISSUED FOR PERMIT IFP
1------+-------------+----1 SHEET TITLE:
LAS BRISAS CONDOMINIUMS
SECTION VIEW - CUTOFF WALL
THIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WTH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE
TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL (GSI) THE DESIGN IS ONLY VALID IF
CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR
DRAWN BY
MAC
CHECKED BY:
JDR
DATE:
10/20/21
PROJECT NUMBER:
210487CA01
SHEET
C-06
LASBRISASCONDOMINIUMS
10'
MICROPILE
CAP
PROPOSED MICROPILES @ TO EXTEND 10' BEHIND A
(EAST) EXPOSED SCARP C-08
BOTTOM OF STRUCTURAL
SHOTCRETE. KEY IN
SHOTCRETE 6" MINIMUM
BELOW SURROUNDING GRADE
ALL MICROPILE TO BE
EMBEDDED A MINIMUM
OF 5' INTO TORREY
SANDSTONE FORMATION
lieo!itabilization International®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
z
0 ~ ~
0:::
0 LL
1-
z
0 0...
~ co
UJ
>- z
UJ 0
0::: l- o::: (/)
00 I- z
<(
Cf)
TWO LAYERS W4.0x4x4 EPOXY C
(OR GALVANIZED) MESH; ONE
ON EACH SIDE OF MICRO
OATED~
LAYER
PILES
NOMINAL 8" REINFORCE
SHOTCRET
~ ------------
CONTINUOUS NO.5 EPOXY COATED
(OR GALVANIZED) WALERS, SPACING
18". PLACED ON TOP OF MESH ON
SOUTH SIDE OF MICROPILES
SPLICE LENGTH OF 30
,
II
KEY IN SHOTCRETE
BASE MINIMUM 6" BELOW
SURROUNDING GRADE
~
['.
r---
"
--
LESS
ILITY)
18" SPACING, GALVANIZED (OR STAIN
STEEL PENDING MATERIAL AVAi LAB
X51 MICROPILES. PILES SHOU
EMBEDDED A MIN. OF 5' INTO UNDER
TORREY SANDSTONE FORM
LO BE
ATION
LYING ~
NVIEW
SHEET REVISIONS PROJECT NAME:
DATE DESCRIPTION NO
09/01/21 ISSUED FOR REVIEW IFR
10/20/21 ISSUED FOR PERMIT IFP
l-----+-----------+--------1 SHEET TITLE:
THIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WTH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE
TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL (GSI) THE DESIGN IS ONLY VALID IF
CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR
DRAWN BY
MAC
1 -- - r -- -
-- -
-- -
-- -
-- - r--,- -- - r---
r--~ -- - -- rI'- r--
~" """- - -- - -- rr-~
1-t- - - t--- t- -- ._ __ 1--- --1-t- -
SELF-DRILLING MICROPILE
4.5" BIT TYP
8"
NOMINAL
0 ~T~CTIONAL VIEW
SHOTCRETE
4" DRAIN PIPE DRAIN STRIP
j
co
~ 8" 4-
SIDE VIEW
2 LAYERS 4x4x4.0 EPOXY
COATED (OR GALVANIZED)
WELDED WIRE MESH
NO. 5 GRADE 60 EPOXY COATED
(OR GALVANIZED) VERTICAL BARS
SPACED 18" HORIZONTALLY,
SPLICE LENGTH OF 30"
NO. 5 GRADE 60 EPOXY COATED
(OR GALVANIZED) HORIZONTAL
BARS SPACED 18" VERTICALLY,
SPLICE LENGTH OF 30"
2" MIN DISTANCE
TO REINFORCEMENT
DRAIN STRIP
CONNECTOR
FRONT VIEW
4" DRAIN PIPE
0 ~T~AIN CONNECTION DETAIL
LAS BRISAS CONDOMINIUMS
CUTOFF WALL DETAILS
CHECKED BY: DATE:
JDR 10/20/21
PROJECT NUMBER:
210487CA01
SHEET
C-07
lieo!itabilization International®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
~ BEARING PLATE WITH
~ NUT TOP AND BOTTOM
GROUND SURFACE
GROUT
SELF-DRILLING
MICROPILE
4.5" MIN. BIT
DIAMETER
s
w
>
z
0 lo
w
Cf)
w
w
Cf)
Cf)
w
0:::
~
0 ~T~CHOR DETAIL
SHEET REVISIONS PROJECT NAME:
DATE DESCRIPTION NO
09/01/21 ISSUED FOR REVIEW IFR
10/20/21 ISSUED FOR PERMIT IFP LAS BRISAS CONDOMINIUMS
1---~>-------------+-----1 SHEET TITLE:
FIELD INSTALLED GROUT
GROUT ABSORPTION
BEYOND BORE HOLE 0
INJECTION ANCHOR
BORE HOLE
0 ~l~ROPILE SECTION
MICROPILE HOLE
DIAMETER= 2-1/4"
6" I.. ~ I
~ j
1/2"
0 ~l~ROPILE BEARING PLATE
MICROPILE ANCHOR DETAILS lieo!itabilization International®
THIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WTH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE
TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL (GSI) THE DESIGN IS ONLY VALID IF
CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR
DRAWN BY
MAC
CHECKED BY: DATE:
JDR 10/20/21
PROJECT NUMBER:
210487CA01
SHEET
C-08
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
NO. 5 GRADE 60 TOP AND
BOTTOM MAT 16-IN O.C
RETAINED SIDE
3" MIN.
NO. 5 GRADE 60 TOP AND
BOTTOM CONTINUOUS.
SPLICE LAP SHALL BE MIN. 30" 18"
C__~====--===-.....::.....==t_~====--====--===-_____),~~-=fl-F-====--====--====--====--====--=i:F-====--====--====--====--====--====--J-====--------,~====--====--====--====--1+=-====--====--====--====--====---d n
NUT TOP & BOTTOM
6-IN X 6-IN X 1/2-IN
STEEL PLATE
EXCAVATION SIDE
SHOTCRETE TO CAP
CONNECTION, EXTEND
REBAR MIN 36" INTO
SHOTCRETE FACING
NOTE:
VIEW LOOKING NORTH AT
FACE OF SHOTCRETE WALL
SHEET REVISIONS
DATE DESCRIPTION
09/01/21 ISSUED FOR REVIEW
10/20/21 ISSUED FOR PERMIT
NO
IFR
IFP
[:]
18", oc
0 ~l?ROPILES - TOP VIEW
NO. 5 GRADE
60 TOP MAT
16"
NO. 5 GRADE
60 BOTTOM MAT
2 - NO. 5 GRADE 60
CONTINUOUS
30" SPLICE LENGTH
0 ~l?ROPILES - SIDE VIEW
PROJECT NAME:
0 N
..----
LAS BRISAS CONDOMINIUMS
SHEET TITLE:
MICROPILE CAP DETAILS
THIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WTH THIS DRAWN BY·. PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE
TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL (GSI) THE DESIGN IS ONLY VALID IF CHECKED BY: DATE: PROJECT NUMBER:
CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR MAC JDR 10/20/21 210487CA01 SHEET
N
..----
SELF-DRILLING
MICROPILE
® ~l?ROPILES - END VIEW
3"MIN
r= 3" MIN
NO.5GRADE60 ----,---,st- N
..----
CONTINUOUS
I 18" 3" MIN i--•-------------1•-il
® ~T~INFORCEMENT - END VIEW
C-09
lieo!itabilization International®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
PROPOSED FINISHED GRADE LINE TO DAYLIGHT TO EXISTING
GRADE TO THE NORTH OF PROPOSED PERMANENT CUTOFF
WALL. EXISTING GRADE ON THE NORTH IS APPROX. 1 :1
EXTEND ALL GRID LAYERS TO
EXPOSED SLOPE FACE,
MIN 4' LENGTH
~ -~--~...----------,, ' ',
' ' ' ' ' ' ' ' ' '
SUB 90% COMPA TION IN
GEOGRID TO TERMINATE MIN 6" BEHIND FINISHED FACE. DUE TO LACK OF LATERAL CONFINEMENT, 90% RELATIVE COMPACTION
ALONG THE FACE MAY NOT BE FEASIBLE. HOWEVER, THE RSS FACE WILL BE COMPACTED TO THE MAXIMUM EXTENT POSSIBLE. ~ ~-------~, ~ ~------~ ' / ',,
FRONT 12" OF R S DUE TO LACK
OF CONFINEMEN AT THE FACE
GEOGRID WILL BE HIGH PERFORMANCE TURF
REINFORCEMENT MATS (HPTRM) OR EQUIVALENT
RI ENFORCED SOIL SLOPE (RSS)
(CONTINUE TO TOP OF BLUFF)
RSS BACKFILL TO BE LOCALLY
SOURCED MATERIAL AND APPROVED
BY PROJECT ENGINEER
RSS GRID LAYERS SPACED
MAXIMUM 12" VERTICALLY
SLOTTED PVC DRAINS,
SPACED 5' HORIZONTALLY
KEY IN BOTTOM LIFT 6"-12"
BELOW TOP OF SEAWALL
EXISTING SEAWALL ~
F-----,~------~'
/-~-------1 ',,
' -· - ---~-- ' --z---~',
SHAPE TOE TO OBT: I:',,
MIN 4' LONG GRID LENGTH
' ' ' ' ' ' ' ',
'
0 ~T~INFORCED SOIL SLOPE SECTION
SHEET REVISIONS PROJECT NAME:
DATE DESCRIPTION NO
09/01/21 ISSUED FOR REVIEW IFR
10/20/21 ISSUED FOR PERMIT IFP
----+-------------'---- SHEET TITLE:
THIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WITH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE
TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY GEOSTABILIZATION INTERNATIONAL. (GSI). THE DESIGN IS ONLY VALID IF
CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR DRAWN BY:
MAC
LAS BRISAS CONDOMINIUMS
SECTION VIEW - RSS SYSTEM
CHECKED BY: DATE:
JDR 10/20/21
PROJECT NUMBER:
210487CA01
SHEET
' ' ' ' ' ' ' '
MIN 90% COMPACTION IN FILL
BEHIND FRONT 12" OF RSS
B3 ANCHOR AND PLATE SHALL BE USED
EVERY 3RD LIFT OF GEOGRID (SEE BELOW
AND SHEET C-03 FOR ANCHOR DETAILS)
4" PERFORATED PIPE SLEEVED WITH FILTER
FABRIC TO PERMIT FLOW OF WATER BUT LIMIT
FLOW OF SOIL INTO PIPE. TIE 4" PIPE INTO SLOTTED
DRAINS EXTENDING TOWARDS EXISTING SEAWALL.
C-10
lieo!itabilization International®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
LASBRISASCONDOMINIUMS
10'
SHEET REVISIONS
DATE DESCRIPTION
09/01/21 ISSUED FOR REVIEW
10/20/21 ISSUED FOR PERMIT
i
I
I
I
I
I
I
I
I
NO
IFR
IFP
PHASE I REINFORCED
SHOTCRETE CUTOFF WALL
PROJECT NAME:
1--------jl--------------t-------i SHEET TITLE:
LAS BRISAS CONDOMINIUMS
J 1-----1--------------t-------i PHASE II MITIGATION SECTION 11-----1-------------;-------1
! 1-----1--------------t-------i
ll-__J _______ __j_------1,-----~-----r-------.::":"'=="'."'.'."'.':::--T:".".':::~---, I THISDRAWINGISFURNISHEDSOLELYFORTHEUSEOFORINCONNECTIONWTHTHIS DRAWN BY: CHECKED BY: DATE: PROJECT NUMBER: SHEET ' PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE i TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY ; GEOSTABILIZATION INTERNATIONAL (GSI) THE DESIGN IS ONLY VALID IF ~ CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR MAC JDR 10/20/21 210487CA01 C-11
PHASE I MICROPILES
AND CAP
• ADDITIONAL REINFORCED SHOTCRETE
AND BLUFF STABILIZATION ELEMENTS
WILL BE REQUIRED TO MITIGATE
GLOBAL FAILURE OF CUTOFF WALL
ONCE EXPOSED DUE TO NATURAL
EROSIONAL PROCESSES.
• TRIGGER ALARMS FOR PHASE II
EROSION MITIGATION:
1. MICROPILES BELOW BASE OF
SHOTCRETE FACING BECOME
EXPOSED UP TO 6', AND/OR
2. FLOW OF RSS BACKFILL TOWARDS
SOUTH AND BETWEEN MICROPILES.
lieo!itabilization International®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
TO HYDRAULIC
PUMP AND
PRESSURE GAGE
COUPLER (AS NECESSARY)
PVC TUBE (BOND-BREAKER),
IF NEEDED
MICROPILE BAR
MICROPILE TEST ACCEPTANCE CRITERIA:
DIAL GAGES ATTACHED TO
INDEPENDENT SUPPORT
REFERENCE PLATE
HYDRAULIC RAM
STEEL BASE PLATE
WOOD TIMBERS
I
I
f- ,...._ C) UJ
z _J
UJ Ill
z _J <(
~ 0~
UJ _J
0 0 a.. .- z a..
0 <(
Ill !:!::
z-----
=>
I
fC)
z
UJ z _J
~ 0
UJ 0
0 .-
z
UJ
Ill
• THE SLOPE OF THE LOAD VERSUS DISPLACEMENT CURVE IS LESS THAN OR EQUAL TO 0.025 IN/KIP AT 2.00 DL. • THE TOTAL MOVEMENT AT 1.3 DL (CREEP) DOES NOT EXCEED 0.04 INCHES BETWEEN 1 AND 10 MINUTE READINGS, OR THE TOTAL MOVEMENT DOES NOT EXCEED 0.08 INCHES BETWEEN 6 AND 60 MINUTE READINGS.
SHEET REVISIONS PROJECT NAME:
PROOF MICROPILE TESTING PROCEDURE AND EQUIPMENT:
• THE REACTION FRAME WILL BE SUFFICIENTLY RIGID AND OF ADEQUATE DIMENSIONS SO THAT EXCESSIVE DEFORMATION OF THE TESTING EQUIPMENT DOES NOT OCCUR. THE REACTION FRAME WILL BE SUPPORTED INDEPENDENTLY OF THE MICROPILE BAR. THE CONFIGURATION OF
THE TESTING APPARATUS WILL BE POSITIONED TO REDUCE THE POTENTIAL OF THE NEED FOR THE RAM, BEARING PLATES, AND STRESSING ANCHORAGE TO BE REPOSITIONED DURING A TEST.
• THE LOAD WILL BE APPLIED WITH A HYDRAULIC RAM AND MEASURED WITH A PRESSURE GAUGE. THE PRESSURE GAUGE WILL BE GRADUATED IN 100 PSI INCREMENTS OR LESS. THE RAM, PRESSURE GAUGES, AND PUMPS WILL HAVE BEEN CALIBRATED WITH EACH OTHER WITHIN THE LAST YEAR BY AN INDEPENDENT AASHTO ACCREDITED LABORATORY OR BY A DEPARTMENT LABORATORY. • MOVEMENT OF THE BAR HEAD SHALL BE MEASURED WITH AT LEAST ONE DIAL GAUGE CAPABLE OF MEASURING TO THE NEAREST 0.001 INCH. THE
GAUGE WILL BE VISUALLY ALIGNED TO BE PARALLEL WITH THE AXIS OF THE BAR AND SHALL BE SUPPORTED INDEPENDENTLY OF THE RAM AND REACTION FRAME. GENERALLY TWO DIAL GAUGES ARE UTILIZED, IF POSSIBLE. • TESTING SHALL BE PERFORMED BY INCREMENTALLY LOADING THE BAR PER TO THE LOADING SCHEDULE PROVIDED BELOW. THE BAR HEAD MOVEMENTS SHALL BE RECORDED AT EACH LOAD INCREMENT WITH THE DIAL GAUGE(S).
DESIGN LOAD (DL):
• LOADING ON THE BAR SHALL BE APPLIED BASED ON THE DESIGN LOAD AS DETERMINED BY FHWA PUBLICATION NHI 05-039, MICROPILE DESIGN AND CONSTRUCTION.
• DESIGN BOND STRENGTH FOR THIS PROJECT IS 615 LB/FT OF BOND. • THE DESIGN LOAD (DL) IS DETERMINED BY MULTIPLYING THE DESIGN BOND VALUES BY THE BOND LENGTH OF MICROPILE.
THE BOND LENGTH FOR TESTING SHOULD BE AT LEAST 10-FT.
TESTING OF MICROPILES:
• PROOF TESTING WILL BE PERFORMED ON 5% OF PRODUCTION MICROPILES. LOADING WILL BE APPLIED IN TENSION. • A MINIMUM 48-HOUR NOTICE WILL BE PROVIDED TO THE CITY'S REPRESENTATIVES PROVIDED THEY WISH TO OBSERVE MICROPILE TESTING AT THE SITE.
• TESTS SHALL OCCUR IN LOCATIONS DETERMINED BY GSI FIELD PERSONNEL ON SITE. • THE ALIGNMENT LOAD (AL) SHALL BE APPLIED TO ALIGN THE TESTING APPARATUS. DIAL GAUGES FOR MEASURING THE MOVEMENT OF THE TEST NAIL SHALL BE SET TO "ZERO" AFTER THE ALIGNMENT LOAD HAS BEEN APPLIED.
LOADING SCHEDULE FOR PROOF TEST
LOADING LOAD HOLD TIME
AL 0.025 DL MAX 2.5 MINUTES
LOAD CYCLE 0.30 DL 2.5 MINUTES
0.45 DL 2.5 MINUTES
0.60 DL 2.5 MINUTES
0.75 DL 2.5 MINUTES
0.90 DL 2.5 MINUTES
1.00 DL 2.5 MINUTES
1.15 DL 2.5 MINUTES
HOLD 1.30 DL ABOVE FOR 10 MINUTES WHILE RECORDING MOVEMENT AT 1, 2, 3, 4, 5, 6, AND 10 MINUTES. IF TOTAL MOVEMENT MEASURED DURING LOAD EXCEEDS 0.04 INCHES BETWEEN THE 1 AND 10 MINUTE AVERAGE READINGS THEN THE LOAD SHOULD BE HELD ON MICROPILE FOR AN ADDITIONAL 50 MINUTES, RECORDING MOVEMENT AT 20, 30, 40, 50, AND 60 MINUTES.
LOAD CYCLE 1.45 DL 2.5 MINUTES
1.60 DL 2.5 MINUTE
UNLOAD CYCLE 1.30 DL 4 MINUTES
1.00 DL 4 MINUTES
0.75 DL 4 MINUTES
0.50 DL 4 MINUTES
0.25 DL 4 MINUTES
AL 0.025 DL MAX 4 MINUTES
DATE DESCRIPTION NO
09/01/21 ISSUED FOR REVIEW IFR
10/20/21 ISSUED FOR PERMIT IFP LAS BRISAS CONDOMINIUMS
1----+--------------+-----1 SHEET TITLE:
THIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WTH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE
TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL (GSI) THE DESIGN IS ONLY VALID IF
CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR
DRAWN BY
MAC
MICROPILE TESTING DETAILS
CHECKED BY: DATE:
JDR 10/20/21
PROJECT NUMBER:
210487CA01
SHEET
C-08
lieo!itabilization International®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
DATE
MICROPILE ID
DRILLED GROUTED
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
31 32
33 34
35 36
37 38
39 40
41 42
43 44
45 46
47 SHEET REVISIONS
DATE DESCRIPTION NO
09/01/21 ISSUED FOR REVIEW IFR
10/20/21 ISSUED FOR PERMIT IFP
THIS DRAWING IS FURNISHED SOLELY FOR THE USE OF OR IN CONNECTION WTH THIS
PROJECT AND THE PROPRIETARY INFORMATION SHOWN HEREON IS NOT TO BE
TRANSMITTED TO ANY OTHER ORGANIZATION WITHOUT SPECIFIC AUTHORIZATION BY
GEOSTABILIZATION INTERNATIONAL (GSI) THE DESIGN IS ONLY VALID IF
CONSTRUCTED AND SUPERVISED BY GSI OR ITS AUTHORIZED SUBCONTRACTOR EMBEDMENTLENGTH(m DATE EMBEDMENTLENGTH(m MICROPILE ID
SOIL ROCK DRILLED GROUTED SOIL ROCK
48 PROJECT NAME:
LAS BRISAS CONDOMINIUMS
SHEET TITLE:
DRILL LOGS
DRAWN BY
MAC
CHECKED BY: DATE: PROJECT NUMBER:
210487CA01
SHEET
JDR 10/20/21 C-13
MUD BALANCE READINGS
READINGS
DATE (1. 75-1.84, TYP. FOR GSl'S 5-BAG MIX, SEE
SHEET C-03 FOR FURTHER DETAILS))
lieo!itabiliz ation International®
Phone: 855.579.0536 I Fax: 970.245.7737
www.geostabilization.com
RECONSTRUCT UPPER BLUFF WITH I
GEOFABRIC REINFORCED FILL
LANDSCAPING & TEMP. IRRIGATION
CONCRETE FILL
TERRACE DEPOSITS
~- ·,' -·-·-EXISTING BLUFF
y~ . . ._.,.. ,_.., ,_ ,_ , __ -- ~--·-·,.,......-
' ' ~~-~'
• ~:f, CLEAN SAND LENS
TIEBACK
SANDSTONE BEDROCK
1. FACTOR OF SAFETY NEAR 1.0
2. GEOTECHNICAL REPORT
3. STRUCTURAL CALCULATIONS
4. LOCATED AS FAR LANDWAFW AS POSSIBLE
5. MINIMIZE ALTERATION OF BLUFF - FACE OR MIMIC EXISTING.
6. INCLUDE DETAILED METHODOLOGY FOR MONITORING AND
MAINTENANCE OVER THE LIFE OF THE DEVICE.
7. MINIMIZE THE NEED F"OR ANY MAINTENANCE THAT NECESSITATATES ADDITIONAL. SEAWARD ENCROACMENT OF THE DEVICE.
8. BLUFF FACE TO HAVE "NATURAL COL.Or~ AND TEXTURE" (SBMC 17.62) Preferred Solution - Seawall and Upper Bluff Repair
City of Solana Beach CC-Approved LUP, February 2013 FIGURE NO. 3 ATTACHMENT 3
RECONSTRUCT UPPER BLUFF WITH
GEOFABRIC REINFORCED FILL
TERRACE DEPOSITS
-=·--;'"" I I, lll ' ,..--, I\ · !JJ: ...
• -I I • l
NOTES:
1. FACTOR OF SAFETY NEAR 1.0
2. GEOTECHNICAL REPORT
3. STRUCTURAL CALCULATIONS
4 . LOCATED AS FAR LANDWARD AS POSSIBLE
5. MINIMIZE ALTERATION OF BUJFF --FACE OR MIMIC EXISTING.
6. INCLUDE DETAILED METHODOLOGY FOR MONITORING AND
MAINTENANCE OVER THE LIFE OF THE DEVICE.
SANDSTONE BEDROCK
7. MINIMIZE THE NEED FOR ANY MAINTENANCE THAT NECESSITATATES ADDITIONAL SEAWARD ENCROACMENT OF THE DEVICE.
8. BLUFF FACE TO HAVE "NATURAL COLOR AND TEXTURE" (SSMC 17.62) Preferred Solution - Upper Bluff Repair
City of Solana Beach CCC-Approved LUP, February 2013 FIGURE NO. 4 SC.IENTIFIC. OR PRODUC.T NAME
6INDER
FERTILIZER
MULCH .
A6R.ONIA VILL05A
ARTEMISIA CALIFORNIA
MIX
CAMISSONIA CHEIRANTHIFOLIA SSP. SUFFR.UTICOSA
ENCELIA CALIFORNIA
ERIOcSoONUM FASCICULATUM
LASTHENIA CALIFORNIA
LASTHENIA cSoLA6RA
LUPINUS 6ICOLOR
MALOSMA LAURINA
MIMULUS PUNICEUS
YUCCA ~HIPPLEI
5ARVON TM
5UPERTHRIVE™
MYCORRHIZAL INOCULUM, cSoLOMIS INTRARADICES
C.OMMON NAME
AZTEC TM OR APPROVED EGUAL
Ie-Ie-Ie
VIRGIN v-lOOD F16ER
SAND VER6ENA
COAST AL SAGE6R.LJ5H
SUN CUP (BEACH EVENING PRIMOSE)
CALIFORNIA ENCELIA
CALIFORNIA 6UCK~HEAT
DAARF GOLDFIELDS
GOLDFIELDS
PYGMY-LEAFED LUPINE
LAUREL SUMAC
MONKE:Y FLOY',ER
OUR LORD'S CANDLE
RATE/AC.RE
.250 LBS.
900 L.65.
9000 LBS.
I L65.
9 LSS.
1/.2 L.65
e LS.
.20 L65.
1-1/.2 LSS.
1-1/.2 L65.
5 LBS.
9 LBS.
1-1/2 LBS.
9 L6S.
Ei GALS.
P.L.5.
.24%
Gf%
1.2 24%
1%
0.90%
11%
,e
51%
1%
58%
5ecD5/I..B.
e,e,ooo
55,000,000
4,000.00
115,000
450,000
9~!50,000
1,eoo,000
115,000
.211)00
12,0001)00
100,000
20Z.IIOO GALS OF HYDROSEED SLURF
40 oz.
ATTACHMENT 4
ATTACHMENT 11D11
ALTERNATIVES ANALYSIS
The proposed project proposed to extend a lateral retention wall from the southern terminus of the existing lower coastal bluff seawall to the top of the failed bluff. The project would also propose reconstruction of a relatively small area of failed mid-to-upper bluff below Las Brisas Condominiums utilizing geogrid / soil, and applying hydroseed consisting of drought-tolerant, salt-resistant native plant species. The alternatives to this project are limited and determined to be infeasible. They are addressed below.
ALTERNATIVE #1: No Project
A No Project alternative would allow a significant failure that has already reached the top of the coastal bluff to continue to extend landward toward the residential structure. Based on the existing slope stability evaluation for the project site, a No Project alternative would result in the very near future loss of the public pedestrian easement that extend from Fletcher Cove south across the rear yard (adjacent to top of bluff) of Las Brisas Condominiums. Emergency public agency vehicle access also served by this easement will be lost. Due to the significant of the ongoing failure, this access has already been temporarily closed by the City of Solana Beach. Further, it the access has already been impacted by the failure at the southern property line of Las Brisas Condominiums.
A No Project Alternative that allows the failure to continue unimpeded would also result in the likely near future impact to the southwestern residential building on the Las Brisas site. The geotechnical / factor of safety evaluation for this building notes that a single additional event failure at the top of bluff could place the building under imminent threat of damage.
Base on this analysis a No Project Alternative is not a viable response to the existing, and ongoing failure conditions at this site.
ALTERNATIVE #2: Placement of a below-grade caisson/grade beam/ tieback system set back from the top of bluff, extending north from the southerly boundary for a span of+/- 25', and extending east along the southerly boundary for a span of+/- 16'.
This alternative would acknowledge that the failure will be allowed to continue upslope until such time has it exposes the caisson system. When that event occurs, the caisson system would receive an additional row of tiebacks and a sculpted and color-treated shotcrete wall covering.
Alternative #2 would provide sufficient protection to the southwesterly residential building on the Las Brisas site, but it would result in the total loss of the existing public access easement that was required as a condition of the complex's initial approval. It would also result in the continuation of mid-to upper bluff failure below the condominium units and would therefore likely need to be extended further to the north as the mid-to-upper bluff continued to fail in that direction.
ATTACHMENT 5
Attachment "D"