City Council Agenda Report
Agenda Item No. 7.k.

DATE: September 10, 2024
TO: Honorable Mayor and Members of the City Council
APPROVED BY: Rene Salas, City Manager
SUBMITTED BY: John Poehler, Director of Public Works
SUBJECT: CONSIDERATION AND APPROVAL OF RESOLUTION NO.
24-218, TO APPROVE THE CITY SERVICE REQUEST WITH

LOS ANGELES COUNTY FOR THE PECK ROAD TRAFFIC

SYNCHRONIZATION PROJECT ON DURFEE AVENUE FROM

RUSH STREET TO THE INTERSECTION OF PECK ROAD

AND DURFEE AVENUE
SUMMARY: The Los Angeles County Department of Public Works (LACDPW) is set to perform a Traffic Signal Synchronization Project (TSSP) on Peck Road from Hemlock Street to Workman Mill Road, which is jurisdictionally shared among three cities—South El Monte, El Monte, and Industry—and the unincorporated communities of Whittier and Whittier Narrows. Due to the scope and cost of the project, County policy requires a City Service Request to be submitted for the TSSP project. The City of South El Monte’s estimated cost share for the project is $86,200.

RECOMMENDED ACTION: Staff recommends City Council:

1. Adopt Resolution No. 24-218 to approve submittal of the City Service Request to the County of Los Angeles, including the project cost share of $86,200;

2. Program $86,200 from the City’s Proposition C Local Return funds to cover the City's cost share; and

3. Authorize the City Manager or designee to negotiate and execute the agreement.

FISCAL/FINANCIAL IMPACT: The estimated total cost of the project is $3,328,200, with the City of South El Monte's share estimated at $548,800, of which the City will be responsible for only $86,200. The County has allocated $2,276,500 from its HighwaysThrough Cities (HTC) Funds, which include $419,000 in Proposition C Discretionary Grant Funds and 43,600 in Proposition C Local Return Funds. Staff recommends programming $86,200 from the City’s Proposition C Local Return funds to cover the City's cost share.

NOTE: the City’s final cost will be determined by the final accounting 120 days after

Page 332 of 881 ends

project completion, which will be based on the improvements located within the City’s jurisdiction.

DISCUSSION: On February 27, 2024, the City Council approved the General Services Agreement (GSAs) between the City of South El Monte and the County of Los Angeles, granting authorization for the County to provide services requested by the City. Services provided under the GSA include on-demand, time-limited services such as street maintenance, enforcement of ordinances, direct assessment collection, and various public works services.

The primary objective of the Peck Road Traffic Signal Synchronization Project is to improve the movement of vehicles and decrease the amount of time motorists will be stopped at a red signal. The project will upgrade 27 traffic signals, expand the existing Advanced Traffic Management System (ATMS) components and the deployment of arterial system detection. The TSSP project will significantly reduce delays and accidents, thereby alleviating motorists' frustrations, air pollution, and operational costs.

The estimated construction contract cost to complete this project ranges from $1,600,000 to $2,200,000, with a maximum construction contract cost of up to 15 percent above this amount. The total project cost is estimated to be $3,328,200. The County is scheduled to advertise for construction bids in November 2024 and select a contractor by March 27, 2025. Construction is anticipated to begin in the fall of 2025 and be completed by February 2027.

Staff recommends the submission of the City Service Request to authorize the County of Los Angeles to perform preliminary engineering, contract administration, construction engineering, traffic control, and other necessary work for the installation of traffic signal upgrades on Peck Road from Hemlock Street to Workman Mill Road as part of the Peck Road Traffic Synchronization Project.

Staff report prepared by Andrés González, Senior Public Works Analyst.

ATTACHMENT(S):

A. Resolution No. 24-218

Page 333 of 881 ends

01257.0006/1010591.1
RESOLUTION NO. 24-XX

A RESOLUTION OF THE SOUTH EL MONTE CITY COUNCIL

AUTHORIZING THE CITY MANAGER TO APPROVE

SUBMITTAL OF A CITY SERVICE REQUEST WITH THE

COUNTY OF LOS ANGELES FOR THE PECK ROAD TRAFFIC

SIGNAL SYNCHRONIZATION PROJECT
WHEREAS, the Los Angeles County Department of Public Works will serve as the lead agency in delivering the project from conceptual design to the completion of the subject project; and
WHEREAS, the City of South El Monte’s estimated cost share of the project is $86,200; and
WHEREAS, staff is requesting an appropriation of $86,200 from the City’s Proposition C Local Return Funds to cover the City’s cost share.

NOW, THEREFORE, THE SOUTH EL MONTE CITY COUNCIL HEREBY RESOLVES AS FOLLOWS:

SECTION 1: The above recitals are true and correct and incorporated by reference.

SECTION 2: The City Council approves submittal of a City Service request to the County of Los Angeles for the Peck Road Traffic Signal Synchronization Project.

SECTION 3: The City Council approves amending the Fiscal Year 2024-2025 budget by appropriating an amount of $86,200 from the City’s Proposition C Local Return Funds to cover the project’s cost share of the Peck Road Traffic Signal Synchronization Project.

SECTION 3: The City Council hereby authorizes the City Manager, or his designee, to take all actions necessary to submit a city services request to the County of Los Angeles for the Peck Road Traffic Signal Synchronization Project.

SECTION 4: The City Clerk shall certify to the passage and adoption of this resolution.

PASSED, APPROVED AND ADOPTED this 10th day of September 2024. _____________________________
Gloria Olmos, Mayor
ATTEST:
_____________________________
Sabrina Muhne, Interim City Clerk

Page 334 of 881 ends

01257.0006/1010591.1

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS:

CITY OF SOUTH EL MONTE )
I, Sabrina Muhne, Interim City Clerk of the City of South El Monte, do hereby certify that the foregoing Resolution, being Resolution No. 24-218, was passed and approved by the City Council of the City of South El Monte at a Regular meeting of said Council held on the 10th day of September 2024, and that said Resolution was adopted by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
_____________________________
Sabrina Muhne, Interim City Clerk

Page 335 of 881 ends

City Council Agenda Report
Agenda Item No. 7.l.

DATE: September 10, 2024
TO: Honorable Mayor and Members of the City Council
APPROVED BY: Rene Salas, City Manager
SUBMITTED BY: John Poehler, Director of Public Works
SUBJECT: CONSIDERATION AND APPROVAL OF RESOLUTION NO.
24-219, APPROVING AWARD OF CONSTRUCTION
CONTRACT TO GENTRY BROTHERS, INC. FOR THE FY 24-
25 PAVEMENT REHABILITATION PROJECT
SUMMARY: On July 29, 2024, the Engineering Department solicited bids for the FY 24- 25 Pavement Rehabilitation Project. The work involves asphalt concrete reconstruction/rehabilitation of existing streets, curb & gutter repairs, and restoration of pavement markings and striping on select segments of Rush St, Klingerman St, and Floradale Ave. The lowest responsive bid was submitted by Gentry Brothers, Inc. in the total bid amount of $1,953,040.00.

RECOMMENDED ACTION: Staff recommends City Council:

1. Adopt and approve the plans and specifications for the FY 24-25 Pavement Rehabilitation Project;

2. Adopt and approve Resolution No. 24-219, awarding the FY 24-25 Pavement Rehabilitation Project contract to the lowest responsible bidder in an amount of $1,953,040.00 to Gentry Brothers Inc. and authorize the City Manager to execute the contract; and

3. Authorize 10% of the total contract amount as contingency allowance to be used if necessary for unforeseen conditions at the City Manager’s discretion.

FISCAL/FINANCIAL IMPACT: The established budget is as follows:

Contract Award Amount $1,953,040.00
Construction Contingency (10% of contract
amount)
$195,304.00
Total Construction Budget $2,148,344.00

Page 336 of 881 ends

The Project will be funded by the following sources.

SB1/RMRA $888,226.00
Measure M Local $482,827.00
Measure R Local $482,827.00
CDBG $294,464.00
Total Budget $2,148,344.00
DISCUSSION: The FY 24-25 Pavement Rehabilitation Project includes asphalt concrete reconstruction/rehabilitation of existing streets, curb & gutter repairs, and restoration of pavement markings and striping on select segments of Rush St, Klingerman St, and Floradale Ave. The construction is anticipated to start in Fall 2024 and will be completed within 60 working days.

The construction portion of the project was advertised on July 29, 2024. The following seven (7) bids were received by the City at the Bid Opening held on August 22, 2024, at 2:00 PM. Below is the list of Bidders and Bid amounts:

Bidder Name (from low to high) Total Bid Amount
Gentry Brothers, Inc. $1,953,040.00
Onyx Paving Co. $2,324,000.00
Toro Enterprises Inc. $2,418,648.50
Palp Inc. dba Excel Paving Co. $2,628,392.00
All American Asphalt $2,698,698.00
Sequel Contractors Inc. $2,717,372.50
Dash Construction Co. $2,782,990.00
The apparent lowest bid was submitted by Gentry Brothers, Inc. in the total bid amount of $1,953,040.00.

Staff conducted a bid analysis and verified the contractor’s licensing, Department of Industrial Relations (DIR) registration, state and federal debarment files and references for Gentry Brothers Inc. Per the bid analysis, the Bid submitted by Gentry Brothers Inc. was determined to be the lowest responsive bid. The Bid submitted by Gentry Brothers Inc. and the bid analysis completed by staff is attached as reference.

Staff report was prepared by Andrés González, Senior Public Works Analyst, in collaboration with TransTech Staff.

Page 337 of 881 ends

ATTACHMENT(S):

A. Resolution No. 24-219
B. Submitted Bid
C. Bid Analysis
D. Contract

Page 338 of 881 ends

ATTACHMENT A
RESOLUTION NO. 24-219

A RESOLUTION OF THE SOUTH EL MONTE CITY COUNCIL

AWARDING CONSTRUCTION CONTRACT TO GENTRY
BROTHERS, INC. FOR THE FY 24-25 PAVEMENT

REHABILITATION PROJECT
WHEREAS, the City of South El Monte desires to construct asphalt concrete reconstruction/rehabilitation of existing streets, curb & gutter repairs, and restoration of pavement markings and striping on select segments of Rush St, Klingerman St, and Floradale Ave; and WHEREAS, the City solicited bids for the FY 24-25 Pavement Rehabilitation Project on July 29, 2024 and the City received seven (7) bids for the Project on August 22, 2024; and WHEREAS, City staff evaluated all bids and determined Gentry Brothers, Inc., has submitted the lowest responsive bid for the Project.

NOW, THEREFORE, THE SOUTH EL MONTE CITY COUNCIL HEREBY RESOLVES AS FOLLOWS:

SECTION 1. The above recitals are true and correct and incorporated by reference.

SECTION 2. The City Council of South El Monte (“City”) hereby adopts and approves the plans and specifications FY 24-25 Pavement Rehabilitation Project, with respect to design and criteria. Copies of the plans and specifications are on file in the City’s Engineering Department.

SECTION 3. Upon reviewing the bids submitted for the work to be performed pursuant to contract and the plans and specifications, the City Council hereby finds that Gentry Brothers, Inc. has submitted the lowest responsive bid for the Project, in the amount of $1,953,040.00.

SECTION 4. The City Council hereby authorizes and directs the City Manager to execute a construction agreement with Gentry Brothers, Inc. for the project, subject to review and approval as to form by the City Attorney. The Council further directs the City Manager to take all actions necessary to effectuate the agreement.

SECTION 5: The City Clerk shall certify to the passage and adoption of this resolution.

Page 339 of 881 ends

PASSED, APPROVED AND ADOPTED this 10th day of September 2024. _____________________________
Gloria Olmos, Mayor
ATTEST:
_____________________________
Sabrina Muhne, Interim City Clerk

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS:

CITY OF SOUTH EL MONTE )
I, Sabrina Muhne, Interim City Clerk of the City of South El Monte, do hereby certify that the foregoing Resolution, being Resolution No. 24-219, was passed and approved by the City Council of the City of South El Monte at a regular meeting of said Council held on the 10th day of September 2024, and that said Resolution was adopted by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
_____________________________
Sabrina Muhne, Interim City Clerk

Page 340 of 881 ends

ATTACHMENT B

Page 341 of 881 ends
Page 342 of 881 ends
Page 343 of 881 ends
Page 344 of 881 ends
Page 345 of 881 ends
Page 346 of 881 ends
Page 347 of 881 ends
Page 348 of 881 ends
Page 349 of 881 ends
Page 350 of 881 ends
Page 351 of 881 ends
Page 352 of 881 ends
Page 353 of 881 ends
Page 354 of 881 ends
Page 355 of 881 ends
Page 356 of 881 ends
Page 357 of 881 ends
Page 358 of 881 ends
Page 359 of 881 ends
Page 360 of 881 ends
Page 361 of 881 ends
Page 362 of 881 ends
Page 363 of 881 ends
Page 364 of 881 ends
Page 365 of 881 ends
Page 366 of 881 ends
Page 367 of 881 ends
Page 368 of 881 ends
Page 369 of 881 ends
Page 370 of 881 ends
Page 371 of 881 ends
Page 372 of 881 ends
Page 373 of 881 ends
Page 374 of 881 ends
Page 375 of 881 ends
Page 376 of 881 ends
Page 377 of 881 ends
Page 378 of 881 ends
Page 379 of 881 ends
Page 380 of 881 ends
Page 381 of 881 ends
Page 382 of 881 ends
Page 383 of 881 ends
Page 384 of 881 ends
Page 385 of 881 ends
Page 386 of 881 ends
Page 387 of 881 ends
Page 388 of 881 ends
Page 389 of 881 ends
Page 390 of 881 ends
Page 391 of 881 ends
Page 392 of 881 ends
Page 393 of 881 ends
Page 394 of 881 ends
Page 395 of 881 ends
Page 396 of 881 ends
Page 397 of 881 ends
Page 398 of 881 ends
Page 399 of 881 ends
Page 400 of 881 ends
Page 401 of 881 ends
Page 402 of 881 ends
Page 403 of 881 ends
Page 404 of 881 ends
Page 405 of 881 ends
Page 406 of 881 ends
Page 407 of 881 ends
Page 408 of 881 ends
Page 409 of 881 ends
Page 410 of 881 ends
Page 411 of 881 ends
Page 412 of 881 ends
Page 413 of 881 ends
Page 414 of 881 ends
Page 415 of 881 ends
Page 416 of 881 ends
Page 417 of 881 ends
Page 418 of 881 ends
Page 419 of 881 ends
Page 420 of 881 ends
Page 421 of 881 ends
Page 422 of 881 ends
Page 423 of 881 ends
Page 424 of 881 ends
Page 425 of 881 ends
Page 426 of 881 ends
Page 427 of 881 ends
Page 428 of 881 ends
Page 429 of 881 ends
Page 430 of 881 ends
Page 431 of 881 ends
Page 432 of 881 ends
Page 433 of 881 ends
Page 434 of 881 ends
Page 435 of 881 ends
Page 436 of 881 ends
Page 437 of 881 ends
Page 438 of 881 ends
Page 439 of 881 ends
Page 440 of 881 ends
Page 441 of 881 ends
Page 442 of 881 ends
Page 443 of 881 ends
Page 444 of 881 ends
Page 445 of 881 ends
Page 446 of 881 ends
Page 447 of 881 ends
Page 448 of 881 ends
Page 449 of 881 ends
Page 450 of 881 ends
Page 451 of 881 ends
Page 452 of 881 ends
Page 453 of 881 ends
Page 454 of 881 ends
Page 455 of 881 ends
Page 456 of 881 ends
Page 457 of 881 ends
Page 458 of 881 ends
Page 459 of 881 ends
Page 460 of 881 ends
Page 461 of 881 ends
Page 462 of 881 ends
Page 463 of 881 ends
Page 464 of 881 ends
Page 465 of 881 ends
Page 466 of 881 ends
Page 467 of 881 ends
Page 468 of 881 ends
Page 469 of 881 ends
Page 470 of 881 ends
Page 471 of 881 ends
Page 472 of 881 ends
Page 473 of 881 ends
Page 474 of 881 ends
Page 475 of 881 ends
Page 476 of 881 ends
Page 477 of 881 ends
Page 478 of 881 ends
Page 479 of 881 ends
Page 480 of 881 ends
Page 481 of 881 ends

Qty Unit Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 Cold-mill 2" existing AC pavement. 61,000 SF $0.70 $42,700.00 $0.77 $46,970.00 $0.95 $57,950.00 $0.94 $57,340.00 $0.61 $37,210.00 $0.70 $42,700.00 $0.75 $45,750.00 $0.77 $47,231.43 $0.61 $0.95 2 Remove existing AC pavement (6" removal) and 12" scarify and recompact 12" subgrade as shown on the plans. 223,650 SF $1.30 $290,745.00 $2.28 $509,922.00 $1.85 $413,752.50 $2.48 $554,652.00 $3.28 $733,572.00 $2.65 $592,672.50 $2.79 $623,983.50 $2.38 $531,328.50 $1.30 $3.28 3 Construct AC overlay (Thickness 2"), Type B-PG 64-10. 460 TON $105.00 $48,300.00 $111.00 $51,060.00 $128.00 $58,880.00 $123.00 $56,580.00 $135.00 $62,100.00 $160.00 $73,600.00 $155.30 $71,438.00 $131.04 $60,279.71 $105.00 $160.00 4 Construct AC overlay (Thickness 6"), Type C2-PG 64-10. 305 TON $105.00 $32,025.00 $111.00 $33,855.00 $138.00 $42,090.00 $124.00 $37,820.00 $135.00 $41,175.00 $124.00 $37,820.00 $155.30 $47,366.50 $127.47 $38,878.79 $105.00 $155.30 5 Construct AC overlay (Thickness 6"), Type B-PG 64-10. 8,810 TON $105.00 $925,050.00 $111.00 $977,910.00 $135.50 $1,193,755.00 $129.00 $1,136,490.00 $133.70 $1,177,897.00 $124.00 $1,092,440.00 $155.30 $1,368,193.00 $127.64 $1,124,533.57 $105.00 $155.30 6 Adjust water valve to grade. 22 EA $250.00 $5,500.00 $1,111.00 $24,442.00 $220.00 $4,840.00 $1,000.00 $22,000.00 $250.00 $5,500.00 $1,400.00 $30,800.00 $1,055.00 $23,210.00 $755.14 $16,613.14 $220.00 $1,400.00 7 Adjust storm drain/sewer manhole frame and cover to grade. 29 EA $1,000.00 $29,000.00 $2,222.00 $64,438.00 $1,350.00 $39,150.00 $1,600.00 $46,400.00 $1,250.00 $36,250.00 $1,700.00 $49,300.00 $1,670.00 $48,430.00 $1,541.71 $44,709.71 $1,000.00 $2,222.00 8 Sawcut and remove existing (joint to joint) and reconstruct 4" PCC sidewalk per SPPWC STD PLAN 113-2. 6,970 SF $12.00 $83,640.00 $15.00 $104,550.00 $21.00 $146,370.00 $23.00 $160,310.00 $18.00 $125,460.00 $28.00 $195,160.00 $18.90 $131,733.00 $19.41 $135,317.57 $12.00 $28.00 9 Remove and reconstruct existing concrete curb and gutter per SPPWC 120-3 to match existing at various locations. Work shall include 12" wide by 8" deep AC pavement slot cut and restore it AC, Type C2-PG 64-10 or Type B-PG 64-10, full depth of AC.
140 LF $100.00 $14,000.00 $123.00 $17,220.00 $110.00 $15,400.00 $135.00 $18,900.00 $146.00 $20,440.00 $90.00 $12,600.00 $81.00 $11,340.00 $112.14 $15,700.00 $81.00 $146.00 10 Remove existing and construct new PCC ADA curb ramps (using 2,500 PSI) as listed per SPPWC, STD. Plan No: 111-5. Case and Type as listed on project plan set.
25 EA $11,000.00 $275,000.00 $8,200.00 $205,000.00 $6,800.00 $170,000.00 $7,000.00 $175,000.00 $9,500.00 $237,500.00 $6,000.00 $150,000.00 $7,250.00 $181,250.00 $7,964.29 $199,107.14 $6,000.00 $11,000.00 11 Remove existing and construct new PCC gutter/cross gutter using 3,250 PSI design mix per SPPWC, STD. Plan No: 122-3 & 123-3. Work shall include AC slot patch (Reconstruction of 1 Foot Strip x 8" deep of AC pavement section).
6,100 SF $22.00 $134,200.00 $28.00 $170,800.00 $32.50 $198,250.00 $45.00 $274,500.00 $25.50 $155,550.00 $58.00 $353,800.00 $26.80 $163,480.00 $33.97 $207,225.71 $22.00 $58.00 12 Install pavement striping and marking including reflective pavement markers. 1 LS $30,000.00 $30,000.00 $57,794.00 $57,794.00 $40,000.00 $40,000.00 $31,000.00 $31,000.00 $20,908.00 $20,908.00 $40,000.00 $40,000.00 $20,765.00 $20,765.00 $34,352.43 $34,352.43 $20,765.00 $57,794.00 13 Remove, restore, and reinstall detector loop and connect wires to existing lead in cables to match existing. 15 EA $800.00 $12,000.00 $777.00 $11,655.00 $525.00 $7,875.00 $600.00 $9,000.00 $592.00 $8,880.00 $800.00 $12,000.00 $503.00 $7,545.00 $656.71 $9,850.71 $503.00 $800.00 14 Install two way blue reflective pavement hydrant marker. 16 EA $55.00 $880.00 $24.00 $384.00 $21.00 $336.00 $25.00 $400.00 $16.00 $256.00 $30.00 $480.00 $16.00 $256.00 $26.71 $427.43 $16.00 $55.00 15 Localized R&R areas at various locations as necessary. Work includes removing existing AC pavement section to 8" depth. Construct 8" AC Type B-PG 64-10 or Type C2-PG 64-10 over 12" scarified and compacted subgrade.
3,000 SF $10.00 $30,000.00 $16.00 $48,000.00 $10.00 $30,000.00 $16.00 $48,000.00 $12.00 $36,000.00 $12.00 $36,000.00 $12.75 $38,250.00 $12.68 $38,035.71 $10.00 $16.00 Apparent Low
Bidder 1
Apparent Low
Bidder 2
Apparent Low
Bidder 3
Apparent Low
Bidder 4
Apparent Low
Bidder 5
Apparent Low
Bidder 6
Apparent Low
Bidder 7
$1,953,040.00 $2,324,000.00 $2,418,648.50 $2,628,392.00 $2,698,698.00 $2,719,372.50 $2,782,990.00 $1,953,040.00 $2,324,000.00 $2,418,648.50 $2,628,392.00 $2,698,698.00 $2,717,372.50 $2,782,990.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,000.00 $0.00

1.32% $25,720.00 2.01% $46,712.40 0.50% $12,093.24 19.80% $520,421.62 2.10% $56,672.66 29.73% $808,000.00 45.00% $1,252,345.50 PCI $ 25,720.00 Case Land
Surveying, Inc. $ 18,824.40 Tesoro Contractors $ 12,093.24 PRS $ 420,542.72 Case Land Surveying, Inc. $ 29,685.68 Martinez Concrete $ 280,000.00 All American Asphalt $ 834,897.00 Traffic Loops
Crackfilling, Inc. $ 8,134.00 BC Traffic Specialist $ 21,027.14 BC Traffic Specialist $ 18,890.89 Case Land Surveying, Inc. $ 19,000.00 EBS Utilities $ 83,489.70 BC Traffic Specialist $ 19,754.00 EBS Utilities $ 65,709.80 Smithson Electric $ 8,096.09 BC Traffic Specialist $ 20,000.00 Martinez Concrete $ 278,299.00 Global Road Sealing
Inc. $ 13,141.96 Manhole Adjustment $ 80,000.00 BC Traffic Specialist $ 27,829.90 PRS $ 400,000.00 Case Land
Surveying, Inc. $ 27,829.90
TLC $ 9,000.00
TOTAL $25,720.00 TOTAL $46,712.40 TOTAL $12,093.24 TOTAL $520,421.62 TOTAL $56,672.66 TOTAL $808,000.00 TOTAL $1,252,345.50 Apparent Low Bidder 2
ONYX PAVING CO. ALL AMERICAN ASPHALT
Apparent Low Bidder 3
TORO ENTERPRISES INC.

1. BID TABULATION
Bid Item and Description

BID TABULATION
Apparent Low Bidder 1
GENTRY BROTHERS INC.

PROJECT NAME: FY 24-25 PAVEMENT REHABILITATION PROJECT
LACDA PROJECT NO.: 602500-22, CITY PROJECT NO.: 640

SUBCONTRACTORS

TOTAL BASE BID AMOUNT CALCULATED BASED ON UNIT PRICES

IS THE BIDDER QUALIFIED BASED ON REFERENCE PROJECTS

CALCULATION CORRECTIONS TO BASE BID AMOUNT SUBMITTED BY CONTRACTOR BASED ON

CALCULATED BID AMOUNT

BID RANKING
SUBCONTRACTOR % AND AMOUNT SHOWN IN THE BID

TOTAL BASE BID AMOUNT INDICATED BY BIDDER

HIGHEST

UNIT BID
PRICE

AVERAGE BID VALUES LOWEST

UNIT BID
PRICE
YES
Apparent Low Bidder 7
DASH CONSTRUCTION CO.

Apparent Low Bidder 6
SEQUEL CONTRACTORS INC.

Apparent Low Bidder 4 Apparent Low Bidder 5
PALP INC. DBA EXCEL PAVING
CO.

D:\Dropbox (Transtech Engineers)\JOBRECRD\2024\240197 SEM FY 24-25 PAVEMENT REHABILITATION BID PACKAGE\WIP\0.CIP\40 Bidding\40.07 Bid Analysis\01. Bid Analysis, SEM, FY 24-25 Pavement Rehabilitation.xlsxBID TABULATION 1 of 1

ATTACHMENT C

Page 482 of 881 ends

APPARENT LOW BID AMOUNT: $1,953,040.00

REVIEW RESULT BY DATE
YES CITY CLERK 8/22/24
YES NG 8/27/24
YES NG 8/27/24
NO NG 8/27/24
YES NG 8/27/24
$25,720.00 NG 8/31/24

51.00% NG 8/27/24

98.68% NG 8/27/24
YES NG 8/27/24

49.00% NG 8/27/24

1.32% NG 8/27/24
YES NG 8/27/24
PRIME CONTRACTOR LICENSE STATUS: GENTRY BROTHERS INC. 397682 NG 8/27/24 PRIME CONTRACTOR DIR REGISTRATION STATUS: GENTRY BROTHERS INC. 1000002240 NG 8/27/24 SUB CONTRACTOR LICENSE STATUS: PCI 415490 NG 8/27/24
SUB CONTRACTOR DIR REGISTRATION STATUS: PCI 1000813536 NG 8/27/24

PRIME CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS: GENTRY BROTHERS INC. NOT ON STATE DEBARRED LIST NG 8/27/24

PRIME CONTRACTOR DEBARMENT STATUS FROM
FEDERAL CONTRACTS: GENTRY BROTHERS INC. NOT ON FEDERAL DEBARRED LIST NG 8/27/24

SUB CONTRACTOR DEBARMENT STATUS FROM STATE
CONTRACTS: PCI NOT ON STATE DEBARRED LIST NG 8/27/24

SUB CONTRACTOR DEBARMENT STATUS FROM FEDERAL
CONTRACTS: PCI NOT ON FEDERAL DEBARRED LIST NG 8/27/24
REFERENCE CHECK ACCEPTABLE: YES NG 8/27/24 See Reference Check Print-out from DIR Web Page attached (http://www.dir.ca.gov/dlse/debar.html) Print-out from SAM Web Page attached (https://www.sam.gov/SAM/) Print-out from DIR Web Page attached (http://www.dir.ca.gov/dlse/debar.html) Print-out from SAM Web Page attached (https://www.sam.gov/SAM/)

2. REVIEW OF APPARENT LOW BID
APPARENT LOW BID SUBMITTED BY: GENTRY BROTHERS INC.

ITEM REVIEWED/CHECKED REMARKS
BID STAMPED AS RECEIVED PRIOR BID TIME:

BID BOND IN PROPER AMOUNT:

ADDENDA ACKNOWLEDGEMENT:

PRIME CONTRACTOR % CALCULATED PER BID SUBMITTAL
(THIS % MUST BE EQUAL OR MORE THAN ABOVE %):

Print-out from DIR Web Page attached
(https://services.dir.ca.gov/gsp?id=dir_contractors&table=x_cdoi2_csm_portal_cus tomer_account_lookup&view=public&sysparm_fixed_query=type%3D2&filter=type %3D2)
ANY APPARENT DISCREPANCY IN THE SUBMITTAL:

TOTAL BID PRICES CALCULATED CORRECTLY:

SUBCONTRACTOR AMOUNT:

MIN PRIME CONTRACTOR % REQUIREMENT FOR WORK PER SPECIFICATIONS:

BIDDER COMPLIES WITH MIN PRIME CONTRACTOR % REQUIREMENT:

MAX ALLOWABLE SUBCONTRACTOR PERCENT PER SPECIFICATIONS:

SUB CONTRACTOR % CALCULATED PER BID SUBMITTAL
(THIS % MUST BE EQUAL OR LESS THAN ABOVE %):

Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/) BIDDER COMPLIES WITH MAX. SUB CONTRACTOR % REQUIREMENT:

Print-out from CLSB Web Page attached (http://www.cslb.ca.gov/) Print-out from DIR Web Page attached
(https://services.dir.ca.gov/gsp?id=dir_contractors&table=x_cdoi2_csm_portal_cus tomer_account_lookup&view=public&sysparm_fixed_query=type%3D2&filter=type %3D2)
D:\Dropbox (Transtech Engineers)\JOBRECRD\2024\240197 SEM FY 24-25 PAVEMENT REHABILITATION BID PACKAGE\WIP\0.CIP\40 Bidding\40.07 Bid Analysis\01. Bid Analysis, SEM, FY 24-25 Pavement Rehabilitation.xlsxREVIEW OF APPARENT LOW BID 1 of 1

Page 483 of 881 ends

REFERENCE PROJECT OWNER

CONTACT & TELEPHONEAMOUNTDATE COMPLETEDDID THE CONTRACTOR DO QUALITY WORKDID THE CONTRACTOR STAY ON SCHEDULEDID THE CONTRACTOR ASK FOR UNNECESSARY CHANGE ORDERSDID THE CONTRACTOR FILE CLAIMS AGAINST YOUWILL YOU HIRE THE CONTRACTOR AGAIN

REMARKS
FY 22-23 Green Street
Project
RKA Consulting
Group, on behalf of
the City of Walnut
Michael Lee
(909) 594-9702 $ 203,975.00 10/19/2023 Yes Yes No No Yes Contractor works very fast and meets
their deadlines. They do not push any
unnecessary change orders. Currently
working with the Contractor on two
projects.

NG 8/27/2024
Alley/Sanitation
Rehabilitation FY 20-21 @
SN-211
City of Chino Eduardo Diaz
(909) 334-3250 $1,423,393.75 2/7/2023 Yes Yes No No Yes Contractor was adequate to work with.

No issues with scheduling. They were
very cooperative with additional change
orders at the City's request.

NG 8/27/2024
CDBG Target Area Alley
Improvements City of Montclair Rosemary Hoerning(909) 625-9446 $ 976,909.28 1/31/2023 Yes Yes No No Yes Contractor communicates quickly and
clearly. Very attentive to scheduling.

Currently working on another $1.7
million CDBG project & highly
recommends.

NG 8/27/2024

3. REFERENCE CHECK OF APPARENT LOW BIDDER

REFERENCE CHECK FOR APPARENT LOW BIDDER

CHECKED BY
DATE
Answer "YES" if satisfied or "NO" if not satisfied

REFERENCE DATA FOR APPARENT LOW BIDDER
GENTRY BROTHERS INC.

D:\Dropbox (Transtech Engineers)\JOBRECRD\2024\240197 SEM FY 24-25 PAVEMENT REHABILITATION BID PACKAGE\WIP\0.CIP\40 Bidding\40.07 Bid Analysis\01. Bid Analysis, SEM, FY 24-25 Pavement Rehabilitation.xlsxREF CHECK 1 of 1

Page 484 of 881 ends

GENTRY BROTHERS INC.
$1,953,040.00

4. LOWEST RESPONSIVE BID
LOWEST RESPONSIVE BID SUBMITTED BY:

IN THE AMOUNT OF:

D:\Dropbox (Transtech Engineers)\JOBRECRD\2024\240197 SEM FY 24-25 PAVEMENT REHABILITATION BID PACKAGE\WIP\0.CIP\40 Bidding\40.07 Bid Analysis\01. Bid Analysis, SEM, FY 24-25 Pavement Rehabilitation.xlsxLOWEST RESPONSIVE BID 1 of 1

Page 485 of 881 ends
Page 486 of 881 ends
Page 487 of 881 ends
Page 488 of 881 ends
Page 489 of 881 ends
Page 490 of 881 ends
Page 491 of 881 ends
Page 492 of 881 ends
Page 493 of 881 ends
Page 494 of 881 ends
Page 495 of 881 ends
Page 496 of 881 ends
Page 497 of 881 ends
Page 498 of 881 ends
Page 499 of 881 ends
Page 500 of 881 ends
Page 501 of 881 ends
Page 502 of 881 ends
Page 503 of 881 ends
Page 504 of 881 ends
Page 505 of 881 ends
Page 506 of 881 ends
Page 507 of 881 ends
Page 508 of 881 ends
Page 509 of 881 ends
Page 510 of 881 ends
Page 511 of 881 ends

01257.0006/1013920.1

ATTACHMENT D

PUBLIC WORKS AGREEMENT
By and Between

CITY OF SOUTH EL MONTE
and
GENTRY BROTHERS, INC.

Page 512 of 881 ends

-1-
01257.0006/1013920.1

AGREEMENT FOR PUBLIC WORKS SERVICES

BETWEEN THE CITY OF SOUTH EL MONTE AND
GENTRY BROTHERS, INC.

THIS AGREEMENT FOR PUBLIC WORKS SERVICES (herein “Agreement”) is made and entered into this 10th day of September 2024 by and between the CITY OF SOUTH EL MONTE, a municipal corporation (“City”) and GENTRY BROTHERS, INC., a California Corporation (“Contractor”). City and Contractor may be referred to, individually or collectively, as “Party” or “Parties.”

RECITALS
A. City has sought, by issuance of a Request for Proposals or Invitation for Bids, the performance of the services defined and described particularly in Article 1 of this Agreement.

B. Following submission of the lowest responsible and responsive bid for the performance of the services, Contractor was selected by the City to perform those services.

C. Pursuant to the South El Monte Municipal Code, City has authority to enter into and execute this Agreement.

D. The Parties desire to formalize the selection of Contractor for performance of the services and desire that the terms of that performance be as particularly defined and described herein.

OPERATIVE PROVISIONS
NOW, THEREFORE, in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows:

ARTICLE 1. WORK OF CONTRACTOR

1.1 Scope of Work.

In compliance with all terms and conditions of this Agreement, the Contractor shall provide those services specified in the “Scope of Work” attached hereto as Exhibit “A” and incorporated herein by this reference, which may be referred to herein as the “services” or “work” hereunder. As a material inducement to the City entering into this Agreement, Contractor represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the work required under this Agreement in a thorough, competent, and professional manner, and is experienced in performing the work and services contemplated herein.

Contractor shall at all times faithfully, competently and to the best of its ability, experience and talent, perform all services described herein. Contractor covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be both of good quality as well as fit for the purpose intended. For purposes of this

Page 513 of 881 ends

-2-
01257.0006/1013920.1
Agreement, the phrase “highest professional standards” shall mean those standards of practice recognized by one or more first-class firms performing similar work under similar circumstances.

1.2 Bid Documents.

The Scope of Work shall include the “General Provisions” and “Special Provisions” in the bid documents for the project entitled, including any documents or exhibits referenced therein (collectively, “bid documents”), all of which are incorporated herein by this reference. In the event of any inconsistency between the terms of the bid documents and this Agreement, the terms of this Agreement shall govern.

1.3 Compliance with Law.

Contractor shall keep itself informed concerning, and shall render all services hereunder in accordance with, all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental entity having jurisdiction in effect at the time service is rendered.

1.4 Compliance with California Labor Law.
(a) Public Work. The Parties acknowledge that the work to be performed under this Agreement is a “public work” as defined in Labor Code Section 1720 and that this Agreement is therefore subject to the requirements of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works contracts and the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. The work performed under this Agreement is subject to compliance monitoring and enforcement by the DIR. Contractor shall post job site notices, as prescribed by regulation.
(b) Prevailing Wages. Contractor shall pay prevailing wages to the extent required by Labor Code Section 1771. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are on file at City Hall and will be made available to any interested party on request. By initiating any work under this Agreement, Contractor acknowledges receipt of a copy of the Department of Industrial Relations (DIR) determination of the prevailing rate of per diem wages, and Contractor shall post a copy of the same at each job site where work is performed under this Agreement.
(c) Penalty for Failure to Pay Prevailing Wages. Contractor shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty to the City, forfeit two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Contractor or by any subcontractor. (d) Payroll Records. Contractor shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Contractor and each subcontractor to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified

Page 514 of 881 ends

-3-
01257.0006/1013920.1
in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform the City of the location of the records. (e) Apprentices. Contractor shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777.6, and 1777.7 and California Code of Regulations Title 8, Section 200 et seq. concerning the employment of apprentices on public works projects.

Contractor shall be responsible for compliance with these aforementioned Sections for all apprenticeable occupations. Prior to commencing work under this Agreement, Contractor shall provide City with a copy of the information submitted to any applicable apprenticeship program.

Within sixty (60) days after concluding work pursuant to this Agreement, Contractor and each of its subcontractors shall submit to the City a verified statement of the journeyman and apprentice hours performed under this Agreement.
(f) Eight-Hour Work Day. Contractor acknowledges that eight (8) hours labor constitutes a legal day's work. Contractor shall comply with and be bound by Labor Code Section 1810.
(g) Penalties for Excess Hours. Contractor shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Contractor shall, as a penalty to the City, forfeit twenty-five dollars ($25) for each worker employed in the performance of this Agreement by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code section 1815, work performed by employees of Contractor in excess of eight (8) hours per day, and forty (40) hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than one and one-half (1½) times the basic rate of pay.
(h) Workers’ Compensation. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees if it has employees. In accordance with the provisions of California Labor Code Section 1861, Contractor certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”
Contractor’s Authorized Initials ________
(i) Contractor’s Responsibility for Subcontractors. For every subcontractor who will perform work under this Agreement, Contractor shall be responsible for such subcontractor's compliance with Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, and shall make such compliance a requirement in any contract with any subcontractor for work under this Agreement. Contractor shall be required to take all

Page 515 of 881 ends

-4-
01257.0006/1013920.1
actions necessary to enforce such contractual provisions and ensure subcontractor's compliance, including without limitation, conducting a review of the certified payroll records of the subcontractor on a periodic basis or upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages. Contractor shall diligently take corrective action to halt or rectify any such failure by any subcontractor.

1.5 Licenses, Permits, Fees and Assessments.

Contractor shall obtain at its sole cost and expense such licenses, permits, registrations, and approvals as may be required by law for the performance of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Contractor’s performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City, its officers, employees or agents of City, against any such fees, assessments, taxes, penalties or interest levied, assessed or imposed against City hereunder.

1.6 Familiarity with Work.
(a) By executing this Agreement, Contractor warrants that Contractor (i) has thoroughly investigated and considered the scope of work to be performed, (ii) has carefully considered how the services should be performed, and (iii) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. If the services involve work upon any site, Contractor warrants that Contractor has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder.
(b) Contractor shall promptly, and before the following conditions are disturbed, notify the City, in writing, of any: (i) material Contractor believes may be hazardous waste as defined in Section 25117 of the Health & Safety Code required to be removed to a Class I, II, or III disposal site in accordance with existing law; (ii) subsurface, unknown or latent conditions, materially different from those indicated; or (iii) unknown physical conditions at the site of any unusual nature, different from those ordinarily encountered and generally recognized as inherent in work of the character provided for in this Agreement, and will materially affect the performance of the services hereunder.
(c) City shall promptly investigate the conditions, and if it finds that the conditions do materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor's cost of, or the time required for, performance of any part of the work, shall issue a change order per Section 1.10 of this Agreement.
(d) In the event that a dispute arises between City and Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in Contractor's cost of, or time required for, performance of any part of the work, Contractor shall not be excused from any scheduled completion date set, but shall proceed with all work to be performed under the Agreement. Contractor shall retain any and all rights provided

Page 516 of 881 ends

-5-
01257.0006/1013920.1
either by contract or by law, which pertain to the resolution of disputes and protests between the contracting parties.
(e) City will compensate Contractor to the extent required by Government Code Section 4215 by issuing a change order per Section 1.10 of this Agreement.

1.7 Protection and Care of Work and Materials.

The Contractor shall adopt reasonable methods, including providing and maintaining storage facilities, during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as caused by City’s own negligence. Stored materials shall be reasonably accessible for inspection. Contractor shall not, without City’s consent, assign, sell, mortgage, hypothecate, or remove equipment or materials which have been installed or delivered and which may be necessary for the completion of the work.

1.8 Warranty.

Contractor warrants all work under the Agreement (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Agreement or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the work or non-conformance of the work to the Agreement, commence and prosecute with due diligence all work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act as soon as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair, remove and replace any portions of the work (or work of other contractors) damaged by its defective work or which becomes damaged in the course of repairing or replacing defective work. For any work so corrected, Contractor's obligation hereunder to correct defective work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected work.

Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Agreement. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Agreement, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non-conforming work and any work damaged by such work or the replacement or correction thereof at Contractor's sole expense.

Page 517 of 881 ends

-6-
01257.0006/1013920.1
Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand.

1.9 Further Responsibilities of Parties.

Both parties agree to use reasonable care and diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all instruments, prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of this Agreement. Unless hereafter specified, neither party shall be responsible for the service of the other.

1.10 Additional Work and Change Orders.
(a) City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Work or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written change order is first given by the Contract Officer to the Contractor, incorporating therein any adjustment in (i) the Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Contractor (“Change Order”). All Change Orders must be signed by the Contractor and Contract Officer prior to commencing the extra work thereunder.
(b) Any increase in compensation of up to ten percent (10%) of the Contract Sum or $25,000, whichever is less; or any increase in the time to perform of up to one hundred eighty (180) days; and does not materially affect the Work and which are not detrimental to the Work or to the interest of the City, may be approved by the Contract Officer. Any greater increases, taken either separately or cumulatively, must be approved by the City Council. (c) Any adjustment in the Contract Sum for a Change Order must be in accordance with the rates set forth in the Schedule of Compensation in Exhibit “C”. If the rates in the Schedule of Compensation do not cover the type of work in the Change Order, the cost of such work shall not exceed an amount agreed upon in writing and signed by Contractor and Contract Officer. If the cost of the Change Order cannot be agreed upon, the City will pay for actual work of the Change Order completed, to the satisfaction of the City, as follows:
(i) Labor: the cost of labor shall be the actual cost for wages of workers and subcontractors performing the work for the Change Order at the time such work is done. The use of labor classifications that would increase the cost of such work shall not be permitted.
(ii) Materials and Equipment: the cost of materials and equipment shall be at cost to Contractor or lowest current price which such materials and equipment are reasonably available at the time the work is done, whichever is lower. (iii) If the cost of the extra work cannot be agreed upon, the Contractor must provide a daily report that includes invoices for labor, materials and equipment costs for the work under the Change Order. The daily report must include: list of names of workers, classifications, and hours worked; description and list of quantities of materials used; type of

Page 518 of 881 ends

-7-
01257.0006/1013920.1
equipment, size, identification number, and hours of operation, including loading and transportation, if applicable; description of other City authorized services and expenditures in such detail as the City may require. Failure to submit a daily report by the close of the next working day may, at the City’s sole and absolute discretion, waive the Contractor’s rights for that day. (d) It is expressly understood by Contractor that the provisions of this Section 1.10 shall not apply to services specifically set forth in the Scope of Work. Contractor hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of Work may be more costly or time consuming than Contractor anticipates and that Contractor shall not be entitled to additional compensation therefor. City may in its sole and absolute discretion have similar work done by other contractors. (e) No claim for an increase in the Contract Sum or time for performance shall be valid unless the procedures established in this Section are followed.

1.11 Special Requirements.

Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the “Special Requirements” attached hereto as Exhibit “B” and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit “B” and any other provisions of this Agreement, the provisions of Exhibit “B” shall govern.

ARTICLE 2. COMPENSATION AND METHOD OF PAYMENT.

2.1 Contract Sum.

Subject to any limitations set forth in this Agreement, City agrees to pay Contractor the amounts specified in the “Schedule of Compensation” attached hereto as Exhibit “C” and incorporated herein by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed One Million Nine Hundred Fifty Three Thousand Forty Dollars and Zero Cents ($1,953,040.00) (the “Contract Sum”), unless additional compensation is approved pursuant to Section 1.10.

2.2 Method of Compensation.

The method of compensation may include: (i) a lump sum payment upon completion; (ii) payment in accordance with specified tasks or the percentage of completion of the services less the contract retention; (iii) payment for time and materials based upon the Contractor’s rates as specified in the Schedule of Compensation, provided that (a) time estimates are provided for the performance of sub tasks, (b) contract retention is maintained and (c) the Contract Sum is not exceeded; or (iv) such other methods as may be specified in the Schedule of Compensation.

2.3 Reimbursable Expenses.

Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, telephone expenses, and travel expenses approved by the Contract Officer in advance, or actual subcontractor expenses of an approved subcontractor pursuant to Section 4.5,

Page 519 of 881 ends

-8-
01257.0006/1013920.1
and only if specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Contractor at all project meetings reasonably deemed necessary by the City.

Coordination of the performance of the work with City is a critical component of the services. If Contractor is required to attend additional meetings to facilitate such coordination, Contractor shall not be entitled to any additional compensation for attending said meetings.

2.4 Invoices.

Each month Contractor shall furnish to City an original invoice for all work performed and expenses incurred during the preceding month in a form approved by City’s Director of Finance. By submitting an invoice for payment under this Agreement, Contractor is certifying compliance with all provisions of the Agreement. The invoice shall contain all information specified in Exhibit “C”, and shall detail charges for all necessary and actual expenses by the following categories: labor (by sub-category), travel, materials, equipment, supplies, and sub-contractor contracts. Sub-contractor charges shall also be detailed by such categories.

Contractor shall not invoice City for any duplicate services performed by more than one person.

City shall, as soon as practicable, independently review each invoice submitted by the Contractor to determine whether the work performed and expenses incurred are in compliance with the provisions of this Agreement. Except as to any charges for work performed or expenses incurred by Contractor which are disputed by City, or as provided in Section 7.3, City will cause Contractor to be paid within thirty (30) days of receipt of Contractor’s correct and undisputed invoice; however, Contractor acknowledges and agrees that due to City warrant run procedures, the City cannot guarantee that payment will occur within this time period. In the event that City does not cause Contractor to be paid within thirty (30) days of receipt of an undisputed and properly submitted invoice, Contractor shall be entitled to the payment of interest to the extent allowed under Public Contract Code Section 20104.50. In the event any charges or expenses are disputed by City, the original invoice shall be returned by City to Contractor, not later than seven (7) days after receipt by the City, for correction and resubmission. Returned invoices shall be accompanied by a document setting forth in writing the reasons why the payment request was rejected. Review and payment by the City of any invoice provided by the Contractor shall not constitute a waiver of any rights or remedies provided herein or any applicable law.

2.5 Waiver.

Payment to Contractor for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Contractor.

ARTICLE 3. PERFORMANCE SCHEDULE

3.1 Time of Essence.

Time is of the essence in the performance of this Agreement.

3.2 Schedule of Performance.

Contractor shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in

Page 520 of 881 ends

-9-
01257.0006/1013920.1
the “Schedule of Performance” attached hereto as Exhibit “D” and incorporated herein by this reference. When requested by the Contractor, extensions to the time period(s) specified in the Schedule of Performance may be approved in writing by the Contract Officer but not exceeding one hundred eighty (180) days cumulatively.

3.3 Force Majeure.

The time period(s) specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Contractor shall within ten (10) days of the commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified. The Contract Officer’s determination shall be final and conclusive upon the parties to this Agreement. In no event shall Contractor be entitled to recover damages against the City for any delay in the performance of this Agreement, however caused, Contractor’s sole remedy being extension of the Agreement pursuant to this Section.

3.4 Inspection and Final Acceptance.

City may inspect and accept or reject any of Contractor’s work under this Agreement, either during performance or when completed. City shall reject or finally accept Contractor’s work within forty-five (45) days after submitted to City. City shall accept work by a timely written acceptance, otherwise work shall be deemed to have been rejected. City’s acceptance shall be conclusive as to such work except with respect to latent defects, fraud and such gross mistakes as to amount to fraud. Acceptance of any work by City shall not constitute a waiver of any of the provisions of this Agreement including, but not limited to, Articles 1 and 5, pertaining to warranty and indemnification and insurance, respectively.

3.5 Term.

Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding September 10, 2025 from the date hereof, except as otherwise provided in the Schedule of Performance (Exhibit “D”).

ARTICLE 4. COORDINATION OF WORK

4.1 Representatives and Personnel of Contractor.

The following principals of Contractor (“Principals”) are hereby designated as being the principals and representatives of Contractor authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith:

Page 521 of 881 ends

-10-
01257.0006/1013920.1
Steven Gentry President & COO
(Name) (Title)
Wayne Gentry, Jr. Secretary/Treasurer & CEO
(Name) (Title)
It is expressly understood that the experience, knowledge, capability and reputation of the foregoing Principals were a substantial inducement for City to enter into this Agreement.

Therefore, the Principals shall be responsible during the term of this Agreement for directing all activities of Contractor and devoting sufficient time to personally supervise the services hereunder.

All personnel of Contractor, and any authorized agents, shall at all times be under the exclusive direction and control of the Principals. For purposes of this Agreement, the Principals may not be replaced nor may their responsibilities be substantially reduced by Contractor without the express written approval of City. Additionally, Contractor shall make every reasonable effort to maintain the stability and continuity of Contractor’s staff and subcontractors, if any, assigned to perform the services required under this Agreement. Contractor shall notify City of any changes in Contractor’s staff and subcontractors, if any, assigned to perform the services required under this Agreement, prior to and during any such performance.

4.2 Status of Contractor.

Contractor shall have no authority to bind City in any manner, or to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. Contractor shall not at any time or in any manner represent that Contractor or any of Contractor’s officers, employees, or agents are in any manner officials, officers, employees or agents of City. Neither Contractor, nor any of Contractor’s officers, employees or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise accrue to City’s employees. Contractor expressly waives any claim Contractor may have to any such rights.

4.3 Contract Officer.

The Contract Officer shall be Rene Salas or such person as may be designated by the City Manager. It shall be the Contractor’s responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and the Contractor shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority, if specified in writing by the City Manager, to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement.

4.4 Independent Contractor.

Neither the City nor any of its employees shall have any control over the manner, mode or means by which Contractor, its agents or employees, perform the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge,

Page 522 of 881 ends

-11-
01257.0006/1013920.1
supervision or control of Contractor’s employees, servants, representatives or agents, or in fixing their number, compensation or hours of service. Contractor shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Contractor shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Contractor in its business or otherwise or a joint venturer or a member of any joint enterprise with Contractor.

4.5 Prohibition Against Subcontracting or Assignment.

The experience, knowledge, capability and reputation of Contractor, its principals and employees were a substantial inducement for the City to enter into this Agreement. Therefore, Contractor shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the City. All subcontractors shall obtain, at its or Contractor’s expense, such licenses, permits, registrations and approvals (including from the City) as may be required by law for the performance of any services or work under this Agreement. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without the express consent of City.

ARTICLE 5. INSURANCE, INDEMNIFICATION AND BONDS

5.1 Insurance Coverages.

Without limiting Contractor’s indemnification of City, and prior to commencement of any services under this Agreement, Contractor shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to City.
(a) General liability insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $2,000,000 per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury, and property damage. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
(b) Automobile liability insurance. Contractor shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Services

Page 523 of 881 ends

-12-
01257.0006/1013920.1
to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident. (c) Professional liability (errors & omissions) insurance. Contractor shall maintain professional liability insurance that covers the Services to be performed in connection with this Agreement, in the minimum amount of $1,000,000 per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this Agreement and Contractor agrees to maintain continuous coverage through a period no less than three (3) years after completion of the services required by this Agreement. (d) Workers’ compensation insurance. Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000).
(e) Subcontractors. Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall include all of the requirements stated herein. (f) Additional Insurance. Policies of such other insurance, as may be required in the Special Requirements in Exhibit “B”.

5.2 General Insurance Requirements.
(a) Proof of insurance. Contractor shall provide certificates of insurance to City as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by City’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City at all times during the term of this Agreement. City reserves the right to require complete, certified copies of all required insurance policies, at any time.
(b) Duration of coverage. Contractor shall procure and maintain for the duration of this Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Services hereunder by Contractor, its agents, representatives, employees or subcontractors. (c) Primary/noncontributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of City before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
(d) City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium

Page 524 of 881 ends

-13-
01257.0006/1013920.1
paid by City will be promptly reimbursed by Contractor or City will withhold amounts sufficient to pay premium from Contractor payments. In the alternative, City may cancel this Agreement. (e) Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or that is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VI (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the City’s Risk Manager.
(f) Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subcontractors.
(g) Enforcement of contract provisions (non-estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder.
(h) Requirements not limiting. Requirements of specific coverage features or limits contained in this section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
(i) Notice of cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide to City with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.
(j) Additional insured status. General liability policies shall provide or be endorsed to provide that City and its officers, officials, employees, and agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.
(k) Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing.

Page 525 of 881 ends

-14-
01257.0006/1013920.1
(l) Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions. (m) Pass through clause. Contractor agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by Contractor, provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contractor agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to City for review. (n) Agency’s right to revise specifications. The City reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the Contractor ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City and Contractor may renegotiate Contractor’s compensation.
(o) Self-insured retentions. Any self-insured retentions must be declared to and approved by City. City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by City.
(p) Timely notice of claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
(q) Additional insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work.

5.3 Indemnification.

To the full extent permitted by law, Contractor agrees to indemnify, defend and hold harmless the City, its officers, employees and agents (“Indemnified Parties”) against, and will hold and save them and each of them harmless from, any and all actions, either judicial, administrative, arbitration or regulatory claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities whether actual or threatened (herein “claims or liabilities”) that may be asserted or claimed by any person, firm or entity arising out of or in connection with the negligent performance of the work, operations or activities provided herein of Contractor, its officers, employees, agents, subcontractors, or invitees, or any individual or entity for which Contractor is legally liable (“indemnitors”), or arising from Contractor’s or indemnitors’ reckless or willful misconduct, or arising from Contractor’s or indemnitors’ negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, and in connection therewith:

Page 526 of 881 ends

-15-
01257.0006/1013920.1
(a) Contractor will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys’ fees incurred in connection therewith;
(b) Contractor will promptly pay any judgment rendered against the City, its officers, agents or employees for any such claims or liabilities arising out of or in connection with the negligent performance of or failure to perform such work, operations or activities of Contractor hereunder; and Contractor agrees to save and hold the City, its officers, agents, and employees harmless therefrom;
(c) In the event the City, its officers, agents or employees is made a party to any action or proceeding filed or prosecuted against Contractor for such damages or other claims arising out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Contractor hereunder, Contractor agrees to pay to the City, its officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys’ fees.

In addition, Contractor agrees to indemnify, defend and hold harmless the Indemnified Parties from, any and all claims and liabilities for any infringement of patent rights, copyrights or trademark on any person or persons in consequence of the use by the Indemnified Parties of articles to be supplied by Contractor under this Agreement, and of which the Contractor is not the patentee or assignee or has not the lawful right to sell the same.

Contractor shall incorporate similar indemnity agreements with its subcontractors and if it fails to do so Contractor shall be fully responsible to indemnify City hereunder therefore, and failure of City to monitor compliance with these provisions shall not be a waiver hereof. This indemnification includes claims or liabilities arising from any negligent or wrongful act, error or omission, or reckless or willful misconduct of Contractor in the performance of professional services and work hereunder. The provisions of this Section do not apply to claims or liabilities occurring as a result of City’s sole negligence or willful acts or omissions, but, to the fullest extent permitted by law, shall apply to claims and liabilities resulting in part from City’s negligence, except that design professionals’ indemnity hereunder shall be limited to claims and liabilities arising out of the negligence, recklessness or willful misconduct of the design professional. The indemnity obligation shall be binding on successors and assigns of Contractor and shall survive termination of this Agreement.

5.4 Notification of Third-Party Claims.

City shall timely notify Contractor of the receipt of any third-party claim relating to the work under this Agreement. City shall be entitled to recover from Contractor its reasonable costs incurred in providing such notification.

5.5 Performance and Labor Bonds.

Concurrently with execution of this Agreement Contractor shall deliver to the City, the following:

Page 527 of 881 ends

-16-
01257.0006/1013920.1
(a) A performance bond in the amount of the Contract Sum of this Agreement, in the form provided by the City Clerk, which secures the faithful performance of this Agreement.
(b) A labor and materials bond in the amount of the Contract Sum of this Agreement, in the form provided by the City Clerk, which secures the payment of all persons furnishing labor and/or materials in connection with the work under this Agreement.

Both the performance and labors bonds required under this Section 5.5 shall contain the original notarized signature of an authorized officer of the surety and affixed thereto shall be a certified and current copy of his power of attorney. The bond shall be unconditional and remain in force during the entire term of the Agreement and shall be null and void only if the Contractor promptly and faithfully performs all terms and conditions of this Agreement and pays all labor and materials for work and services under this Agreement.

5.6 Sufficiency of Insurer or Surety.

Insurance and bonds required by this Agreement shall be satisfactory only if issued by companies qualified to do business in California, rated “A” or better in the most recent edition of Best’s Rating Guide, The Key Rating Guide or in the Federal Register, and only if they are of a financial category Class VII or better, unless such requirements are waived by the Risk Manager of the City (“Risk Manager”) due to unique circumstances. If this Agreement continues for more than 3 years duration, or in the event the Risk Manager determines that the work or services to be performed under this Agreement creates an increased or decreased risk of loss to the City, the Contractor agrees that the minimum limits of the insurance policies and the performance bond required by Section 5.5 may be changed accordingly upon receipt of written notice from the Risk Manager.

5.7 Substitution of Securities.

Pursuant to Public Contract Code Section 22300, substitution of eligible equivalent securities for any funds withheld to ensure performance under this Agreement may be permitted at the request and sole expense of the Contractor. Alternatively, the Contractor may, pursuant to an escrow agreement in a form prescribed by Public Contract Code Section 22300, request payment of retentions funds earned directly to the escrow agent at the sole expense of the Contractor.

5.8 Release of Securities.

City shall release the Performance and Labor Bonds when the following have occurred:
(a) Contractor has made a written request for release and provided evidence of satisfaction of all other requirements under Article 5 of this Agreement; (b) the Work has been accepted; and
(c) after passage of the time within which lien claims are required to be made pursuant to applicable laws; if lien claims have been timely filed, City shall hold the Labor

Page 528 of 881 ends

-17-
01257.0006/1013920.1
Bond until such claims have been resolved, Contractor has provided statutory bond, or otherwise as required by applicable law.

ARTICLE 6. RECORDS, REPORTS, AND RELEASE OF INFORMATION

6.1 Records.

Contractor shall keep, and require subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports, studies, certified and accurate copies of payroll records in compliance with all applicable laws, or other documents relating to the disbursements charged to City and services performed hereunder (the “books and records”), as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the performance of such services. Any and all such documents shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of 3 years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required. In the event of dissolution of Contractor’s business, custody of the books and records may be given to City, and access shall be provided by Contractor’s successor in interest. Notwithstanding the above, the Contractor shall fully cooperate with the City in providing access to the books and records if a public records request is made and disclosure is required by law including but not limited to the California Public Records Act.

6.2 Reports.

Contractor shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as the Contract Officer shall require. Contractor hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Contractor agrees that if Contractor becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services contemplated herein or, if Contractor is providing design services, the cost of the project being designed, Contractor shall promptly notify the Contract Officer of said fact, circumstance, technique or event and the estimated increased or decreased cost related thereto and, if Contractor is providing design services, the estimated increased or decreased cost estimate for the project being designed.

6.3 Ownership of Documents.

All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents and other materials (the “documents and materials”) prepared by Contractor, its employees, subcontractors and agents in the performance of this Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Contractor shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the documents and materials hereunder. Any use, reuse or assignment of such completed documents for other projects and/or use of uncompleted

Page 529 of 881 ends

-18-
01257.0006/1013920.1
documents without specific written authorization by the Contractor will be at the City’s sole risk and without liability to Contractor, and Contractor’s guarantee and warranties shall not extend to such use, reuse or assignment. Contractor may retain copies of such documents for its own use.

Contractor shall have an unrestricted right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Contractor fails to secure such assignment, Contractor shall indemnify City for all damages resulting therefrom. Moreover, Contractor with respect to any documents and materials that may qualify as “works made for hire” as defined in 17 U.S.C. § 101, such documents and materials are hereby deemed “works made for hire” for the City.

6.4 Confidentiality and Release of Information.
(a) information gained or work product produced by Contractor in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Contractor. Contractor shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the Contract Officer.
(b) Contractor, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the Contract Officer or unless requested by the City Attorney, voluntarily provide documents, declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered "voluntary" provided Contractor gives City notice of such court order or subpoena. (c) If Contractor, or any officer, employee, agent or subcontractor of Contractor, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Contractor for any damages, costs and fees, including attorneys’ fees, caused by or incurred as a result of Contractor’s conduct. (d) Contractor shall promptly notify City should Contractor, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed there under. City retains the right, but has no obligation, to represent Contractor or be present at any deposition, hearing or similar proceeding. Contractor agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Contractor. However, this right to review any such response does not imply or mean the right by City to control, direct, or rewrite said response.

ARTICLE 7. ENFORCEMENT OF AGREEMENT AND TERMINATION

7.1 California Law.

This Agreement shall be interpreted, construed and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other

Page 530 of 881 ends

-19-
01257.0006/1013920.1
appropriate court in such county, and Contractor covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in the County of Los Angeles, State of California.

7.2 Disputes.
(a) Default; Cure. In the event that Contractor is in default under the terms of this Agreement, the City shall not have any obligation or duty to continue compensating Contractor for any work performed after the date of default. Instead, the City may give notice to Contractor of the default and the reasons for the default. The notice shall include the timeframe in which Contractor may cure the default. This timeframe is presumptively thirty (30) days, but may be extended, though not reduced, if circumstances warrant. During the period of time that Contractor is in default, the City shall hold all invoices and shall proceed with payment on the invoices only when the default is cured. In the alternative, the City may, in its sole discretion, elect to pay some or all of the outstanding invoices during the period of default. If Contractor does not cure the default, the City may take necessary steps to terminate this Agreement under this Article.

Any failure on the part of the City to give notice of the Contractor’s default shall not be deemed to result in a waiver of the City’s legal rights or any rights arising out of any provision of this Agreement.
(b) Dispute Resolution. This contract is subject to the provisions of Article 1.5 (commencing at Section 20104) of Division 2, Part 3 of the California Public Contract Code regarding the resolution of public works claims of less than $375,000. Article 1.5 mandates certain procedures for the filing of claims and supporting documentation by the Contractor, for the response to such claims by the City, for a mandatory meet and confer conference upon the request of the Contractor, for mandatory non-binding mediation in the event litigation is commenced, and for mandatory judicial arbitration upon the failure to resolve the dispute through mediation. This Agreement hereby incorporates the provisions of Article 1.5 as though fully set forth herein.

7.3 Retention of Funds.

Contractor hereby authorizes City to deduct from any amount payable to Contractor (whether or not arising out of this Agreement) (i) any amounts the payment of which may be in dispute hereunder or which are necessary to compensate City for any losses, costs, liabilities, or damages suffered by City, and (ii) all amounts for which City may be liable to third parties, by reason of Contractor’s acts or omissions in performing or failing to perform Contractor’s obligation under this Agreement. In the event that any claim is made by a third party, the amount or validity of which is disputed by Contractor, or any indebtedness shall exist which shall appear to be the basis for a claim of lien, City may withhold from any payment due, without liability for interest because of such withholding, an amount sufficient to cover such claim. The failure of City to exercise such right to deduct or to withhold shall not, however, affect the obligations of the Contractor to insure, indemnify, and protect City as elsewhere provided herein.

Page 531 of 881 ends

-20-
01257.0006/1013920.1

7.4 Waiver.

Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision or a waiver of any subsequent breach or violation of any provision of this Agreement.

Acceptance by City of any work or services by Contractor shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver.

Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement.

7.5 Rights and Remedies are Cumulative.

Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party.

7.6 Legal Action.

In addition to any other rights or remedies, either party may take legal action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. Notwithstanding any contrary provision herein, Contractor shall file a claim pursuant to Government Code Sections 905 et seq. and 910 et seq., in order to pursue a legal action under this Agreement.

7.7 Liquidated Damages.

Since the determination of actual damages for any delay in performance of this Agreement would be extremely difficult or impractical to determine in the event of a breach of this Agreement, the Contractor and its sureties shall be liable for and shall pay to the City the sum of $250.00 (Two Hundred Fifty Dollars) as liquidated damages for each calendar day of delay in the performance of any service required hereunder, as specified in the Schedule of Performance (Exhibit “D”). The City may withhold from any monies payable on account of services performed by the Contractor any accrued liquidated damages. Pursuant to Government Code Section 4215, Contractor shall not be assessed liquidated damages for delay in completion of the project when such delay was caused by the failure of the public agency or owner of the utility to provide for removal or relocation of utility facilities.

7.8 Termination Prior to Expiration of Term.

This Section shall govern any termination of this Contract except as specifically provided in the following Section for termination for cause. The City reserves the right to terminate this Contract at any time, with or without cause, upon thirty (30) days’ written notice to Contractor, except that where termination is due to the fault of the Contractor, the period of notice may be

Page 532 of 881 ends

-21-
01257.0006/1013920.1
such shorter time as may be determined by the Contract Officer. In addition, the Contractor reserves the right to terminate this Contract at any time, with or without cause, upon sixty (60) days’ written notice to City, except that where termination is due to the fault of the City, the period of notice may be such shorter time as the Contractor may determine. Upon receipt of any notice of termination, Contractor shall immediately cease all services hereunder except such as may be specifically approved by the Contract Officer. Except where the Contractor has initiated termination, the Contractor shall be entitled to compensation for all services rendered prior to the effective date of the notice of termination and for any services authorized by the Contract Officer thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, except as provided in Section 7.3. In the event the Contractor has initiated termination, the Contractor shall be entitled to compensation only for the reasonable value of the work product actually produced hereunder. In the event of termination without cause pursuant to this Section, the terminating party need not provide the non-terminating party with the opportunity to cure pursuant to Section 7.2.

7.9 Termination for Default of Contractor.

If termination is due to the failure of the Contractor to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 7.2, take over the work and prosecute the same to completion by contract or otherwise, and the Contractor shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to the Contractor for the purpose of set-off or partial payment of the amounts owed the City as previously stated.

7.10 Attorneys’ Fees.

If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney’s fees. Attorney’s fees shall include attorney’s fees on any appeal, and in addition a party entitled to attorney’s fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment.

7.11 Unfair Business Practices Claims.

In entering into this Agreement, Contractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials related to this Agreement. This assignment shall be made and become effective at the time the City renders final payment to the Contractor without further acknowledgment of the Parties.

Page 533 of 881 ends

-22-
01257.0006/1013920.1
ARTICLE 8. CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION

8.1 Non-liability of City Officers and Employees.

No officer or employee of the City shall be personally liable to the Contractor, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Contractor or to its successor, or for breach of any obligation of the terms of this Agreement.

8.2 Conflict of Interest.

Contractor covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Contractor’s performance of services under this Agreement. Contractor further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent or subcontractor without the express written consent of the Contract Officer. Contractor agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement.

No officer or employee of the City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which effects his financial interest or the financial interest of any corporation, partnership or association in which he is, directly or indirectly, interested, in violation of any State statute or regulation. The Contractor warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement.

8.3 Covenant Against Discrimination.

Contractor covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry, or other protected class in the performance of this Agreement. Contractor shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry, or other protected class.

8.4 Unauthorized Aliens.

Contractor hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C. § 1101 et seq., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Contractor so employ such unauthorized aliens for the performance of work and/or services covered by this Agreement, and should any liability or sanctions be imposed against City for such use of unauthorized aliens, Contractor hereby agrees to and shall reimburse City for the cost of all such liabilities or sanctions imposed, together with any and all costs, including attorneys' fees, incurred by City.

Page 534 of 881 ends

-23-
01257.0006/1013920.1
ARTICLE 9. MISCELLANEOUS PROVISIONS

9.1 Notices.

Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail, in the case of the City, to the City Manager and to the attention of the Contract Officer (with her/his name and City title), City of South El Monte, 1415 Santa Anita Avenue, South El Monte, California 91733, and in the case of the Contractor, to the person at the address designated on the execution page of this Agreement.

Either party may change its address by notifying the other party of the change of address in writing.

Notice shall be deemed communicated at the time personally delivered or in seventy-two (72) hours from the time of mailing if mailed as provided in this Section. All correspondence relating to this Agreement shall be serialized consecutively.

9.2 Interpretation.

The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply.

9.3 Counterparts.

This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument.

9.4 Integration; Amendment.

This Agreement including the attachments hereto is the entire, complete and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by the Contractor and by the City Council. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void.

9.5 Severability.

In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless.

Page 535 of 881 ends

-24-
01257.0006/1013920.1

9.6 Warranty & Representation of Non-Collusion.

No official, officer, or employee of City has any financial interest, direct or indirect, in this Agreement, nor shall any official, officer, or employee of City participate in any decision relating to this Agreement which may affect his/her financial interest or the financial interest of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any State or municipal statute or regulation. The determination of “financial interest” shall be consistent with State law and shall not include interests found to be “remote” or “noninterests” pursuant to Government Code Sections 1091 or 1091.5. Contractor warrants and represents that it has not paid or given, and will not pay or give, to any third party including, but not limited to, any City official, officer, or employee, any money, consideration, or other thing of value as a result or consequence of obtaining or being awarded any agreement.

Contractor further warrants and represents that (s)he/it has not engaged in any act(s), omission(s), or other conduct or collusion that would result in the payment of any money, consideration, or other thing of value to any third party including, but not limited to, any City official, officer, or employee, as a result of consequence of obtaining or being awarded any agreement. Contractor is aware of and understands that any such act(s), omission(s) or other conduct resulting in such payment of money, consideration, or other thing of value will render this Agreement void and of no force or effect.

Contractor’s Authorized Initials _______

9.7 Corporate Authority.

The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE]

Page 536 of 881 ends

-25-
01257.0006/1013920.1
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first-above written.

CITY:

CITY OF SOUTH EL MONTE, a municipal
corporation
____________________________________
Rene Salas, City Manager
ATTEST:

Sabrina Muhne, Interim City Clerk
APPROVED AS TO FORM:

ALESHIRE & WYNDER, LLP
Anthony R. Taylor, City Attorney
CONTRACTOR:

Gentry Brothers, Inc., a California
corporation
By:

Name: Steven Gentry
Title: President and COO
By:

Name: Wayne Gentry, Jr.

Title: Secretary/Treasurer and CEO
Address: 384 Live Oak Ave
Irwindale, CA 91706
Two corporate officer signatures required when Contractor is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer. CONTRACTOR’S SIGNATURES

SHALL BE DULY NOTARIZED, AND APPROPRIATE ATTESTATIONS SHALL BE INCLUDED AS

MAY BE REQUIRED BY THE BYLAWS, ARTICLES OF INCORPORATION, OR OTHER RULES OR REGULATIONS APPLICABLE TO CONTRACTOR’S BUSINESS ENTITY.

Page 537 of 881 ends

01257.0006/1013920.1

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
On __________, 2024 before me, ________________, personally appeared ________________, proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature: _____________________________________

OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT

INDIVIDUAL

CORPORATE OFFICER
_______________________________

TITLE(S)

PARTNER(S) LIMITED

GENERAL

ATTORNEY-IN-FACT

TRUSTEE(S)

GUARDIAN/CONSERVATOR
OTHER_______________________________
______________________________________
SIGNER IS REPRESENTING:
(NAME OF PERSON(S) OR ENTITY(IES))
_____________________________________________
_____________________________________________
___________________________________

TITLE OR TYPE OF DOCUMENT
___________________________________

NUMBER OF PAGES
___________________________________

DATE OF DOCUMENT
___________________________________

SIGNER(S) OTHER THAN NAMED ABOVE
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document.

Page 538 of 881 ends

01257.0006/1013920.1

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
On __________, 2024 before me, ________________, personally appeared ________________, proved to me on the basis of satisfactory evidence to be the person(s) whose names(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature: _____________________________________

OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT

INDIVIDUAL

CORPORATE OFFICER
_______________________________

TITLE(S)

PARTNER(S) LIMITED

GENERAL

ATTORNEY-IN-FACT

TRUSTEE(S)

GUARDIAN/CONSERVATOR
OTHER_______________________________
______________________________________
SIGNER IS REPRESENTING:
(NAME OF PERSON(S) OR ENTITY(IES))
_____________________________________________
_____________________________________________
___________________________________

TITLE OR TYPE OF DOCUMENT
___________________________________

NUMBER OF PAGES
___________________________________

DATE OF DOCUMENT
___________________________________

SIGNER(S) OTHER THAN NAMED ABOVE
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy or validity of that document.

Page 539 of 881 ends

01257.0006/1013920.1 A-1
EXHIBIT “A”

SCOPE OF WORK
I. Contractor shall perform all of the work and comply with all of the specifications and requirements in the “General Provisions” and “Special Provisions” included in the bid documents for the project entitled FY 24-25 Pavement Rehabilitation Project in South El Monte, including any documents or exhibits referenced therein and attached hereto as Exhibit A-1.

II. Brief description of the work to be performed:

The work involves asphalt concrete reconstruction/rehabilitation of existing streets, curb & gutter repairs, and restoration of pavement markings and striping on select segments of Rush St, Klingerman St, and Floradale Ave.

III. In addition to the requirements of Section 6.2, during performance of the work, Contractor will keep the City apprised of the status of performance by delivering the following status reports:

A. Project Baseline Schedule
B. Project Look ahead Schedule (3 weeks look ahead) Updates IV. All work is subject to review and acceptance by the City, and must be revised by the Contractor without additional charge to the City until found satisfactory and accepted by City.

V. Contractor shall provide safe and continuous passage for pedestrian and vehicular traffic in accordance with the Work Area Traffic Control Handbook (WATCH), latest edition.

Page 540 of 881 ends

01257.0006/1013920.1 B-1
EXHIBIT “B”

SPECIAL REQUIREMENTS
(Superseding Contract Boilerplate)
The Agreement is amended as provided herein. Deleted text is indicated in strikethrough and added text in bold italics.

None.

Page 541 of 881 ends

01257.0006/1013920.1 C-1
EXHIBIT “C”

SCHEDULE OF COMPENSATION
I. Contractor shall perform all work at the rates on the Bid Sheet submitted as part of Contractor’s Proposal, and listed below:

Page 542 of 881 ends

01257.0006/1013920.1 C-2
II. A retention of five percent (5%) shall be held from each payment as a contract retention to be paid as part of the final payment upon satisfactory completion of services.

III. Within the budgeted amounts for each item on the Bid Sheet, and with the approval of the Contract Officer, funds may be shifted from one item’s sub-budget to another so long as the Contract Sum is not exceeded per Section 2.1, unless Additional Work is approved per Section 1.10.

IV. The City will compensate Contractor for the Services performed upon submission of a valid invoice. Each invoice is to include:

A. Line items for all personnel describing the work performed, the number of hours worked, and the hourly rate.

B. Line items for all materials and equipment properly charged to the Services.

C. Line items for all other approved reimbursable expenses claimed, with supporting documentation.

D. Line items for all approved subcontractor labor, supplies, equipment, materials, and travel properly charged to the Services.

V. The total compensation for the Services shall not exceed the amount provided in Section 2.1 of this Agreement.

Page 543 of 881 ends

01257.0006/1013920.1 D-1
EXHIBIT “D”

SCHEDULE OF PERFORMANCE
I. Contractor shall perform all work timely in accordance with the following schedule:

The Contractor shall complete all work within sixty (60) working days.

II. Contractor shall deliver the following tangible work products to the City by the following dates.

A. Project Baseline Schedule (Date(s) will be mutually-agreed upon between the parties)
B. Project Look ahead Schedule (3 weeks look ahead) Updates (Date(s) be mutuallyagreed upon between the parties) III. The Contract Officer may approve extensions for performance of the services in accordance with Section 3.2.

Page 544 of 881 ends

01257.0006/1013920.1 D-1

PERFORMANCE BOND
WHEREAS, the CITY OF SOUTH EL MONTE, (“City”), has awarded to GENTRY BROTHERS, INC., as Contractor (“Principal”), a Contract for the work entitled and described as follows: FY 24-25 PAVEMENT REHABILITATION PROJECT;
WHEREAS, the Contractor is required under the terms of said Contract to furnish a bond for the faithful performance of the Contract;
NOW, THEREFORE, we the undersigned Contractor and Surety, are held and firmly bound unto the City in the sum of ________________________________________ ($______________), this amount being not less than one hundred percent (100%) of the total Contract price, lawful money of the United States of America, for payment of which sum well and truly be made we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. In case suit is brought upon this bond, the Surety will pay a reasonable attorney’s fee to the City in an amount to be fixed by the court.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bound Contractor, or its heirs, executors, administrators, successors, or assigns, shall in all things stand and abide by, well and truly keep and perform all undertakings, terms, covenants, conditions, and agreements in the said Contract and any alteration thereof, made as therein provided, all within the time and in the manner designated and in all respects according to their true intent and meaning, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

FURTHER, the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or modification of the Contract Documents or of the work to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of such change, extension of time, alteration, or modification of the Contract Documents or of the work to be performed thereunder.

Executed on 20___.

PRINCIPAL
(Seal if Corporation) By
Title
(Attach Acknowledgment of Authorized Representative of Principal)

Page 545 of 881 ends

01257.0006/1013920.1 D-2
Any claims under this bond may be addressed to:
(name and address of Surety)
(name and address of Surety's agent for service
of
process in California, if different from above)
(telephone number of Surety's agent in California)
(Attach Acknowledgment)
SURETY
By
(Attorney-in-Fact)
APPROVED:
(Attorney for CITY)
NOTICE:

No substitution or revision to this bond form will be accepted. Sureties must be authorized to do business in and have an agent for service of process in California. Certified copy of Power of Attorney must be attached.

Page 546 of 881 ends

01257.0006/1013920.1

PAYMENT BOND
(Labor and Material Bond)
WHEREAS, the CITY OF SOUTH EL MONTE, (“City”), has awarded GENTRY BROTHERS, INC., as Contractor (“Principal”), a Contract for the work entitled and described as follows: FY 24-25 PAVEMENT REHABILITATION PROJECT;
WHEREAS, said Contractor is required to furnish a bond in conjunction with said Contract, to secure the payment of claims of laborers, mechanics, material men, and other persons as provided by law;
NOW, THEREFORE, we the undersigned Contractor and Surety, are held and firmly bound unto the City in the sum of ________________________________________ ($______________), this amount being not less than one hundred percent (100%) of the total Contract price, lawful money of the United States of America, for payment of which sum well and truly be made we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. In case suit is brought upon this bond, the Surety will pay a reasonable attorney’s fee to the City in an amount to be fixed by the court.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if said Contractor, its heirs, executors, administrators, successors, assigns, or subcontractor fails to pay: (1) for any work, materials, services, provisions, provender, or other supplies, or for the use of implements of machinery, used in, upon, for, or about the performance of the work to be done, or for any work or labor thereon of any kind; (2) for work performed by any of the persons named in Civil Code Section 9100; (3) for any amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract; and/or (4) for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and/or its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, then the Surety herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void.

This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon the bond. Moreover, if the City or any entity or person entitled to file stop payment notices is required to engage the services of an attorney in connection with the enforcement of this bond, each shall be liable for the reasonable attorney's fees incurred, with or without suit, in addition to the above sum.

Said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or modification of the Contract Documents or of the work to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of such change, extension of time, alteration, or modification of the Contract Documents or of the work to be performed thereunder.

Page 547 of 881 ends

01257.0006/1013920.1
Executed on , 20____.

PRINCIPAL
(Seal if Corporation) By
Title
(Attach Acknowledgment of Authorized Representative of Principal) Any claims under this bond may be addressed to:
(name and address of Surety)
(name and address of Surety's agent for service
of process in California, if different from above)
(telephone number of Surety's agent in California)
(Attach Acknowledgment)
SURETY
By
(Attorney-in-Fact)
APPROVED:
(Attorney for CITY)
NOTICE:

No substitution or revision to this bond form will be accepted. Sureties must be authorized to do business in and have an agent for service of process in California. Certified copy of Power of Attorney must be attached.

Page 548 of 881 ends

01257.0006/1013920.1

WORKERS COMPENSATION INSURANCE CERTIFICATE
Description of Contract: City of SOUTH EL MONTE
Project: FY 24-25 Pavement Rehabilitation Project
Type of Insurance: Workers' Compensation and
Employers' Liability Insurance
THIS IS TO CERTIFY that the following policy has been issued by the below-stated company in conformance with the requirements of Article 5 of the Contract and is in force at this time, and is in a form approved by the Insurance Commissioner.

The Company will give at least 30 days' written notice to the City and Engineer/Architect prior to any cancellation of said policy.

POLICY NUMBER EXPIRATION DATE LIMITS OF LIABILITY
Workers' Compensation:

Statutory Limits Under the Laws
of the State of California
Employers' Liability:
$_________________ Each Accident
$_________________ Disease - Policy Limit
$_________________ Disease - Each Employee
Named Insured (Contractor) Insurance Company
Street Number Street Number
City and State City and State
By
(Company Representative)
(SEE NOTICE ON NEXT PAGE)

Page 549 of 881 ends

01257.0006/1013920.1
Insurance Company Agent for Service
of Process in California:

Name
Agency
Street Number
City and State
Telephone Number
This certificate is issued as a matter of information only and confers no rights upon the certificate holder. This certificate does not amend, extend, or alter the coverage afforded by the policy listed herein.

This is to certify that the policy has been issued to the named insured for the policy period indicated, notwithstanding any requirement, term, or condition of any contract or other document with respect to which this certificate may be issued or may pertain, the insurance afforded by the policy described herein is subject to all the terms, exclusions, and conditions of such policy.

NOTICE:

No substitution or revision to the above certificate form will be accepted. If the insurance called for is provided by more than one insurance company, a separate certificate in the exact above form shall be provided for each insurance company.

Page 550 of 881 ends

01257.0006/1013920.1

ADDITIONAL INSURED ENDORSEMENT

COMPREHENSIVE GENERAL LIABILITY
Name and address of named insured (“Named Insured”)
Name and address of Insurance Company (“Company”)
General description of agreement(s), permit(s), license(s), and/or activity(ies) insured Notwithstanding any inconsistent statement in the policy to which this endorsement is attached (the “Policy”) or in any endorsement now or hereafter attached thereto, it is agreed as follows:

1. The
(“Public Agency”), its elected officials, officers, attorneys, agents, employees, and volunteers are additional insureds (the above named additional insureds are hereafter referred to as the “Additional Insureds”) under the Policy in relation to those activities described generally above with regard to operations performed by or on behalf of the Named Insured. The Additional Insureds have no liability for the payment of any premiums or assessments under the Policy.

2. The insurance coverages afforded the Additional Insureds under the Policy shall be primary insurance, and no other insurance maintained by the Additional Insureds shall be called upon to contribute with the insurance coverages provided by the Policy.

3. Each insurance coverage under the Policy shall apply separately to each Additional Insured against whom claim is made or suit is brought except with respect to the limits of the Company's liability.

4. Nothing in this contract of insurance shall be construed to preclude coverage of a claim by one insured under the policy against another insured under the policy. All such claims shall be covered as third-party claims, i.e., in the same manner as if separate policies had been issued to each insured. Nothing contained in this provision shall operate to increase or replicate the Company's limits of liability as provided under the policy.

5. The insurance afforded by the Policy for contractual liability insurance (subject to the terms, conditions and exclusions applicable to such insurance) includes liability assumed by the Named Insured under the indemnification and/or hold harmless provision(s) contained in or executed in conjunction with the written agreement(s) or permit(s) designated above, between the Named Insured and the Additional Insureds.

6. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits (except as the result of the payment of claims), or non-renewal except after written notice to Public Agency, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereof. In the event of Company's failure to comply with this notice provision, the policy as initially drafted will continue in full force and effect until compliance with this notice requirement.

7. Company hereby waives all rights of subrogation and contribution against the Additional Insureds, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to the perils insured against in relation to those activities described generally above with regard

Page 551 of 881 ends

01257.0006/1013920.1
to operations performed by or on behalf of the Named Insured regardless of any prior, concurrent, or subsequent active or passive negligence by the Additional Insureds.

8. It is hereby agreed that the laws of the State of California shall apply to and govern the validity, construction, interpretation, and enforcement of this contract of insurance.

9. This endorsement and all notices given hereunder shall be sent to Public Agency at:

City Manager, City of South El Monte, 1415 Santa Anita Avenue, South El Monte, California 91733

10. Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.

TYPE OF COVERAGES TO WHICH POLICY PERIOD LIMITS OF

THIS ENDORSEMENT ATTACHES FROM/TO LIABILITY

11. Scheduled items or locations are to be identified on an attached sheet. The following inclusions relate to the above coverages. Includes:
□ Contractual Liability □ Explosion Hazard
□ Owners/Landlords/Tenants □ Collapse Hazard
□ Manufacturers/Contractors □ Underground Property Damage □ Products/Completed Operations □ Pollution Liability
□ Broad Form Property Damage □ Liquor Liability
□ Extended Bodily Injury □
□ Broad Form Comprehensive □
General Liability Endorsement □

12. A □ deductible or □ self-insured retention (check one) of $ applies to all coverage(s) except:
(if none, so state). The deductible is applicable □ per claim or □ per occurrence (check one).

13. This is an □ occurrence or □ claims made policy (check one).

14. This endorsement is effective on at 12:01 a.m. and forms a part of Policy Number .
(signatures on following page)

Page 552 of 881 ends

01257.0006/1013920.1
I, (print name), hereby
declare under penalty of perjury under the laws of the State of California, that I have the authority to bind the Company to this endorsement and that by my execution hereof, I do so bind the Company.

Executed , 20
Signature of Authorized Representative
(Original signature only; no facsimile signature
Telephone No.: ( ) or initialed signature accepted)

Page 553 of 881 ends

01257.0006/1013920.1

ADDITIONAL INSURED ENDORSEMENT

AUTOMOBILE LIABILITY
Name and address of named insured (“Named Insured”)
Name and address of Insurance Company (“Company”)
General description of agreement(s), permit(s), license(s), and/or activity(ies) insured Notwithstanding any inconsistent statement in the policy to which this endorsement is attached (the “Policy”) or in any endorsement now or hereafter attached thereto, it is agreed as follows:

1. The
(“Public Agency”), its elected officials, officers, attorneys, agents, employees, and volunteers are additional insureds (the above named additional insureds are hereafter referred to as the “Additional Insureds”) under the Policy in relation to those activities described generally above with regard to operations performed by or on behalf of the Named Insured. The Additional Insureds have no liability for the payment of any premiums or assessments under the Policy.

2. The insurance coverages afforded the Additional Insureds under the Policy shall be primary insurance, and no other insurance maintained by the Additional Insureds shall be called upon to contribute with the insurance coverages provided by the Policy.

3. Each insurance coverage under the Policy shall apply separately to each Additional Insured against whom claim is made or suit is brought except with respect to the limits of the Company's liability.

4. Nothing in this contract of insurance shall be construed to preclude coverage of a claim by one insured under the policy against another insured under the policy. All such claims shall be covered as third-party claims, i.e., in the same manner as if separate policies had been issued to each insured. Nothing contained in this provision shall operate to increase or replicate the Company's limits of liability as provided under the policy.

5. The insurance afforded by the Policy for contractual liability insurance (subject to the terms, conditions and exclusions applicable to such insurance) includes liability assumed by the Named Insured under the indemnification and/or hold harmless provision(s) contained or executed in conjunction with the written agreement(s) or permit(s) designated above, between the Named Insured and the Additional Insureds.

6. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits (except as the result of the payment of claims), or non-renewal except after written notice to Public Agency, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereto. In the event of Company's failure to comply with this notice provision, the policy as initially drafted will continue in full force and effect until compliance with this notice requirement.

7. Company hereby waives all rights of subrogation and contribution against the Additional Insureds, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to the perils insured against in relation to those activities described generally above with regard

Page 554 of 881 ends

01257.0006/1013920.1
to operations performed by or on behalf of the Named Insured regardless of any prior, concurrent, or subsequent active or passive negligence by the Additional Insureds.

8. It is hereby agreed that the laws of the State of California shall apply to and govern the validity, construction, interpretation, and enforcement of this contract of insurance.

9. This endorsement and all notices given hereunder shall be sent to Public Agency at:

City Manager
City of SOUTH EL MONTE
1415 Santa Anita Avenue
SOUTH EL MONTE, California 91733

10. Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.

TYPE OF COVERAGES TO WHICH POLICY PERIOD LIMITS OF

THIS ENDORSEMENT ATTACHES FROM/TO LIABILITY

11. Scheduled items or locations are to be identified on an attached sheet. The following inclusions relate to the above coverages. Includes:
□ Any Automobiles □ Truckers Coverage
□ All Owned Automobiles □ Motor Carrier Act
□ Non-owned Automobiles □ Bus Regulatory Reform Act
□ Hired Automobiles □ Public Livery Coverage
□ Scheduled Automobiles □
□ Garage Coverage □

12. A □ deductible or □ self-insured retention (check one) of $ applies to all coverage(s) except: (if none, so state). The deductible is applicable □ per claim or □ per occurrence (check one).

13. This is an □ occurrence or □ claims made policy (check one).

14. This endorsement is effective on at 12:01 a.m. and forms a part of Policy Number . (signatures on following page)

Page 555 of 881 ends

01257.0006/1013920.1
I, (print name), hereby
declare under penalty of perjury under the laws of the State of California, that I have the authority to bind the Company to this endorsement and that by my execution hereof, I do so bind the Company.

Executed , 20
Signature of Authorized Representative
(Original signature only; no facsimile signature
Telephone No.: ( ) or initialed signature accepted)

Page 556 of 881 ends

01257.0006/1013920.1

ADDITIONAL INSURED ENDORSEMENT

EXCESS LIABILITY
Name and address of named insured (“Named Insured”)
Name and address of Insurance Company (“Company”)
General description of agreement(s), permit(s), license(s), and/or activity(ies) insured Notwithstanding any inconsistent statement in the policy to which this endorsement is attached (the “Policy”) or in any endorsement now or hereafter attached thereto, it is agreed as follows:

1. The
(“Public Agency”), its elected officials, officers, attorneys, agents, employees, and volunteers are additional insureds (the above named additional insureds are hereafter referred to as the “Additional Insureds”) under the Policy in relation to those activities described generally above with regard to operations performed by or on behalf of the Named Insured. The Additional Insureds have no liability for the payment of any premiums or assessments under the Policy.

2. The insurance coverages afforded the Additional Insureds under the Policy shall be primary insurance, and no other insurance maintained by the Additional Insureds shall be called upon to contribute with the insurance coverages provided by the Policy.

3. Each insurance coverage under the Policy shall apply separately to each Additional Insured against whom claim is made or suit is brought, except with respect to the limits of the Company's liability.

4. Nothing in this contract of insurance shall be construed to preclude coverage of a claim by one insured under the policy against another insured under the policy. All such claims shall be covered as third-party claims, i.e., in the same manner as if separate policies had been issued to each insured. Nothing contained in this provision shall operate to increase or replicate the Company's limits of liability as provided under the policy.

5. The insurance afforded by the Policy for contractual liability insurance (subject to the terms, conditions and exclusions applicable to such insurance) includes liability assumed by the Named Insured under the indemnification and/or hold harmless provision(s) contained in or executed in conjunction with the written agreement(s) or permit(s) designated above, between the Named Insured and the Additional Insureds.

6. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits (except as the result of the payment of claims), or non-renewal except after written notice to Public Agency, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereto. In the event of Company's failure to comply with this notice provision, the policy as initially drafted will continue in full force and effect until compliance with this notice requirement.

7. Company hereby waives all rights of subrogation and contribution against the Additional Insureds, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to the perils insured against in relation to those activities described generally above with regard to operations performed by or on behalf of the Named Insured regardless of any prior, concurrent, or subsequent active or passive negligence by the Additional Insureds.

Page 557 of 881 ends

01257.0006/1013920.1

8. It is hereby agreed that the laws of the State of California shall apply to and govern the validity, construction, interpretation, and enforcement of this contract of insurance.

9. This endorsement and all notices given hereunder shall be sent to Public Agency at:

City Manager
City of SOUTH EL MONTE
1415 Santa Anita Avenue
SOUTH EL MONTE, California 91733

10. Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.

TYPE OF COVERAGES TO WHICH POLICY PERIOD LIMITS OF

THIS ENDORSEMENT ATTACHES FROM/TO LIABILITY
□ Following Form
□ Umbrella Liability
□

11. Applicable underlying coverages:

INSURANCE COMPANY POLICY NO. AMOUNT

12. The following inclusions, exclusions, extensions or specific provisions relate to the above coverages:

13. A □ deductible or □ self-insured retention (check one) of $ applies to all coverage(s) except:
(if none, so state). The deductible is applicable □ per claim or □ per occurrence (check one).

14. This is an □ occurrence or □ claims made policy (check one).

15. This endorsement is effective on at 12:01 a.m. and forms a part of Policy Number .

Page 558 of 881 ends

01257.0006/1013920.1
(signatures on following page)
I, (print name), hereby
declare under penalty of perjury under the laws of the State of California, that I have the authority to bind the Company to this endorsement and that by my execution hereof, I do so bind the Company.

Executed , 20
Signature of Authorized Representative
(Original signature only; no facsimile signature
Telephone No.: ( ) or initialed signature accepted)

Page 559 of 881 ends

City Council Agenda Report
Agenda Item No. 7.m.

DATE: September 10, 2024
TO: Honorable Mayor and Members of the City Council
APPROVED BY: Rene Salas, City Manager
SUBMITTED BY: John Poehler, Director of Public Works
SUBJECT: CONSIDERATION AND APPROVAL OF RESOLUTION NO.
24-220, AWARDING A PUBLIC WORKS AGREEMENT TO
SOUTHERN CALIFORNIA PRECISION CONCRETE INC. DBA

PRECISION CONCRETE CUTTING FOR TRIP HAZARD

REMOVAL SERVICES
SUMMARY: Staff seeks City Council approval to award a Public Works Agreement to Southern California Precision Concrete Inc. dba Precision Concrete Cutting for Trip Hazard Removal Services.

RECOMMENDED ACTION: Staff recommends City Council:

1. Adopt Resolution No. 24-220, awarding a Public Works Agreement to Southern California Precision Concrete Inc dba Precision Concrete Cutting for Trip Hazard Removal Services; and

2. Authorize the City Manager or designee to negotiate and execute the agreement.

ENVIRONMENTAL ANALYSIS: The action proposed herein is not a project subject to the California Environmental Quality Act (CEQA) pursuant to Section 20165 of CEQA and Sections 15060(c)(2), 15060(c)(3), and 15378 of the State CEQA Guidelines and, as such, no environmental document pursuant to CEQA is required. Sidewalk repair complies with all requirements of the California Environmental Quality Act (CEQA) and is categorically exempt under Section 15301 Class 1 Subsection (c) as the work involves maintenance and repair of existing facilities with negligible or no expansion of use.

FISCAL/FINANCIAL IMPACT: The total contract amount for Trip Hazard Removal Services will not exceed $148,756.72. $153,000 has been appropriated for these services within the City Council’s approved FY 2024/25 budget. This includes $85,756.72 from Measure M funds and $63,000 from Transportation Development Act funds.

DISCUSSION: Sidewalks develop unevenness over time due to pavement expansion and contraction, underlying soil conditions, trees, landscaping, and other factors causing

Page 560 of 881 ends

deterioration. The City routinely conducts inspections and maintenance of these public sidewalks, notes deficiencies, and systematically makes repairs. To further this effort, the City hired Precision Concrete Cutting in March 2024 to conduct a comprehensive sidewalk survey of the entire city. An inventory of risk factors and distress items was collected over a 3-week period and summarized into a comprehensive report that identified, described, and recommended actions to address each problem condition.

To benefit from cost savings, the City will utilize the Master Services Agreement between the California Joint Powers Insurance Authority (CJPIA) and Southern California Precision Concrete Inc, operating as Precision Concrete Cutting, which was established on January 1, 2019, and renewed on February 15, 2023. This Master Services Agreement provides CJPIA members, including the City, with access to professional sidewalk inspection and maintenance services at a reduced rate. It includes a predefined set of services and associated costs to assist in the removal of trip hazards.

To assess the cost-effectiveness of Precision Concrete Cutting, CJPIA conducted a sample project where both Precision and another grinding company inspected and estimated repairs for an entire city. It was found that Precision Concrete Cutting was less expensive because their proprietary process allows them to repair and cut in locations that grinders cannot reach. In contrast, the grinding company often recommended removing and replacing sections that their equipment could not access which increased the cost of the project.

Staff recommends that the City Council approve a Public Works Agreement with Southern California Precision Concrete Inc. dba Precision Concrete Cutting for Trip Hazard Removal Services in a not-to-exceed amount of $148,756.72and authorize the City Manager or designee to execute the agreement.

Staff report prepared by Andrés González, Senior Public Works Analyst.

ATTACHMENT(S):

A. Resolution No. 24-220
B. Precision Concrete Cutting Agreement
C. Proposal for South El Monte
D. Precision Concrete Cutting - CJPIA Master Services Agreement

Page 561 of 881 ends

01257.0006/1012754.1

ATTACHMENT A
RESOLUTION NO. 24-220

A RESOLUTION OF THE SOUTH EL MONTE CITY COUNCIL

AWARDING A PROFESSIONAL SERVICES AGREEMENT TO
SOUTHERN CALIFORNIA PRECISIONS, INC. DBA

PRECISION CONCRETE CUTTING FOR TRIP HAZARD

REMOVAL SERVICES
WHEREAS, the City invests in maintaining the public sidewalks in order to preserve public health, safety, and welfare; and
WHEREAS, on January 1, 2019 and February 15, 2023, the California Joint Powers Insurance Authority (“CJPIA”) entered into a Master Services Agreement with Southern California Precision Cutting Inc. dba Precision Concrete Cutting to establish services and costs for CJPIA members to provide sidewalk assessment and trip hazard removal services (“Services”); and
WHEREAS, South El Monte Municipal Code Chapter 3.16 allows the City to “piggyback” off of the CJPIA Master Services Agreement and enter into an agreement with Precision Concrete Cutting; and
WHEREAS, the City seeks to engage Precision Concrete Cutting to address trip hazards using their proprietary saw cutting techniques, as identified in the inspection database; and WHEREAS, Precision Concrete Cutting provided a cost proposal to complete in a notto-exceed amount of $148,756.72; and WHEREAS, Precision Concrete Cutting represents that it is fully qualified to perform such services by virtue of its experience and the training, education and expertise of its principals and employees.

NOW, THEREFORE, THE SOUTH EL MONTE CITY COUNCIL HEREBY RESOLVES AS FOLLOWS:

SECTION 1: The above recitals are true and correct and incorporated by reference.

SECTION 2: The action proposed herein is not a project subject to the California Environmental Quality Act (CEQA) in accordance with Section 21065 of CEQA and State CEQA Guidelines Sections 15060(c)(2), 15060(c)(3), and 15378. Entering into an agreement for trip hazard removal services is an administrative action that would not cause either a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment. Therefore, the proposed action is not a “project” subject to CEQA, as defined in Section 21065 of CEQA and Section 15378 of the State CEQA Guidelines. Since the action is not a project subject to CEQA, no environmental document is required.

Page 562 of 881 ends

01257.0006/1012754.1
SECTION 3: The City Council hereby authorizes the City Manager, or his designee, to take all actions necessary to effectuate and execute a public works agreement with Southern California Precision Cutting Inc. dba Precision Concrete Cutting in the amount of $148,756.72, subject to the approval by the City Attorney as to form.

SECTION 4: The City Clerk shall certify to the passage and adoption of this resolution.

PASSED, APPROVED AND ADOPTED this 10th day of September 2024. _____________________________
Gloria Olmos, Mayor
ATTEST:
_____________________________
Sabrina Muhne, Interim City Clerk

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) SS:

CITY OF SOUTH EL MONTE )
I, Sabrina Muhne, Interim City Clerk of the City of South El Monte, do hereby certify that the foregoing Resolution, being Resolution No. 24-220 was passed and approved by the City Council of the City of South El Monte at a regular meeting of said Council held on the 10th day of September 2024, and that said Resolution was adopted by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
_____________________________
Sabrina Muhne, Interim City Clerk

Page 563 of 881 ends

01257.0006/1012751.1

ATTACHMENT B

PUBLIC WORKS AGREEMENT
By and Between

CITY OF SOUTH EL MONTE
and

SOUTHERN CALIFORNIA PRECISION CONCRETE INC
dba PRECISION CONCRETE CUTTING

Page 564 of 881 ends

01257.0006/1012751.1

AGREEMENT FOR PUBLIC WORKS SERVICES

BETWEEN THE CITY OF SOUTH EL MONTE AND
SOUTHERN CALIFORNIA PRECISION CONCRETE INC dba PRECISION

CONCRETE CUTTING
THIS AGREEMENT FOR PUBLIC WORKS SERVICES (herein “Agreement”) is made and entered into this _______ day of 2024 by and between the CITY OF SOUTH EL MONTE, a municipal corporation (“City”) and SOUTHERN CALIFORNIA PRECISION CONCRETE INC dba PRECISION CONCRETE CUTTING, (“Contractor”).

City and Contractor may be referred to, individually or collectively, as “Party” or “Parties.”

RECITALS
A. The City desires to retain Contractor, on an independent contractor basis, to perform services for public works, as more particularly described below.

B. Contractor represents that it is fully qualified to perform such services by virtue of its experience and the training, education and expertise of its principals and employees.

C. Pursuant to the South El Monte Municipal Code, City has authority to enter into and execute this Agreement.

D. The Parties desire to formalize the selection of Contractor for performance of the services and desire that the terms of that performance be as particularly defined and described herein.

OPERATIVE PROVISIONS
NOW, THEREFORE, in consideration of the mutual promises and covenants made by the Parties and contained herein and other consideration, the value and adequacy of which are hereby acknowledged, the parties agree as follows:

ARTICLE 1. WORK OF CONTRACTOR

1.1 Scope of Work.

In compliance with all terms and conditions of this Agreement, the Contractor shall provide the services specified in the “Scope of Work” attached hereto as Exhibit “A” and incorporated herein by this reference, which may be referred to herein as the “services” or “work” hereunder. As a material inducement to the City entering into this Agreement, Contractor represents and warrants that it has the qualifications, experience, and facilities necessary to properly perform the work required under this Agreement in a thorough, competent, and professional manner, and is experienced in performing the work and services contemplated herein.

Contractor shall at all times faithfully, competently, and to the best of its ability, experience and talent, perform all services described herein. Contractor covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be both of good quality as well as fit for the purpose intended. For purposes of this

Page 565 of 881 ends

01257.0006/1012751.1
Agreement, the phrase “highest professional standards” shall mean and refer to the standards of practice recognized by first-class firms performing similar work under similar circumstances.

1.2 Bid Documents.

The Scope of Work shall include the “General Provisions” and “Special Provisions” in the bid documents for the project entitled, including any documents or exhibits referenced therein (collectively, “bid documents”), all of which are incorporated herein by this reference. In the event of any inconsistency between the terms of the bid documents and this Agreement, the terms of this Agreement shall govern.

1.3 Compliance with Law.

Contractor shall keep itself informed concerning, and shall render all services hereunder in accordance with all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental entity having jurisdiction in effect at the time service is rendered.

1.4 Compliance with California Labor Law.
(a) Public Work. The Parties acknowledge that the work to be performed under this Agreement is a “public work” as defined in Labor Code Section 1720 and that this Agreement is therefore subject to the requirements of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works contracts and the rules and regulations established by the Department of Industrial Relations (“DIR”) implementing such statutes. The work performed under this Agreement is subject to compliance monitoring and enforcement by the DIR. Contractor shall post job site notices as prescribed by regulation.
(b) Prevailing Wages. Contractor shall pay prevailing wages to the extent required by Labor Code Section 1771. Pursuant to Labor Code Section 1773.2, copies of the prevailing rate of per diem wages are on file at City Hall and will be made available to any interested party upon request. By initiating any work under this Agreement, Contractor acknowledges receipt of a copy of DIR’s determination of the prevailing rate of per diem wages, and Contractor shall post a copy of the same at each job site where work is performed under this Agreement.
(c) Penalty for Failure to Pay Prevailing Wages. Contractor shall comply with and be bound by the provisions of Labor Code Sections 1774 and 1775 concerning the payment of prevailing rates of wages to workers and the penalties for failure to pay prevailing wages. The Contractor shall, as a penalty to the City, forfeit two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by DIR for the work or craft in which the worker is employed for any public work done pursuant to this Agreement by Contractor or by any subcontractor. (d) Payroll Records. Contractor shall comply with and be bound by the provisions of Labor Code Section 1776, which requires Contractor and each subcontractor to: keep accurate payroll records and verify such records in writing under penalty of perjury, as specified

Page 566 of 881 ends

01257.0006/1012751.1
in Section 1776; certify and make such payroll records available for inspection as provided by Section 1776; and inform the City of the location of the records. (e) Apprentices. Contractor shall comply with and be bound by the provisions of Labor Code Sections 1777.5, 1777.6, and 1777.7 and California Code of Regulations Title 8, Section 200 et seq., concerning the employment of apprentices on public works projects.

Contractor shall be responsible for compliance with these aforementioned Sections for all apprentice-able occupations. Prior to commencing work under this Agreement, Contractor shall provide City with a copy of the information submitted to any applicable apprenticeship program.

Within sixty (60) days after concluding work pursuant to this Agreement, Contractor and each of its subcontractors shall submit to the City a verified statement of the journeyman and apprentice hours performed under this Agreement.
(f) Eight-Hour Work Day. Contractor acknowledges that eight (8) hours of labor constitutes a legal day's work. Contractor shall comply with and be bound by Labor Code Section 1810.
(g) Penalties for Excess Hours. Contractor shall comply with and be bound by the provisions of Labor Code Section 1813 concerning penalties for workers who work excess hours. The Contractor shall, as a penalty to the City, forfeit twenty-five dollars ($25) for each worker employed in the performance of this Agreement by the Contractor or by any subcontractor for each calendar day during which such a worker is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of the provisions of Division 2, Part 7, Chapter 1, Article 3 of the Labor Code. Pursuant to Labor Code Section 1815, work performed by employees of Contractor in excess of eight (8) hours per day, and forty (40) hours during any one week shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than one and one-half (1½) times the basic rate of pay.
(h) Workers’ Compensation. California Labor Code Sections 1860 and 3700 provide that every employer will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, Contractor certifies as follows:
“I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.”
Contractor’s Authorized Initials ________
(i) Contractor’s Responsibility for Subcontractors. For every subcontractor who will perform work under this Agreement, Contractor shall be responsible for such subcontractor's compliance with Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code, and shall make such compliance a requirement in any contract with any subcontractor for work under this Agreement. Contractor shall be required to take all

Page 567 of 881 ends

01257.0006/1012751.1
actions necessary to enforce such contractual provisions and ensure subcontractor's compliance, including without limitation, conducting a review of the certified payroll records of the subcontractor on a periodic basis or upon becoming aware of the failure of the subcontractor to pay their workers the specified prevailing rate of wages. Contractor shall diligently take corrective action to halt or rectify any such failure by any subcontractor.

1.5 Licenses, Permits, Fees, and Assessments.

Contractor shall obtain at its sole cost and expense such licenses, permits, registrations, and approvals as may be required by law for the performance of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Contractor’s performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City, its officers, employees or agents of City, against any such fees, assessments, taxes, penalties or interest levied, assessed or imposed against City hereunder.

1.6 Familiarity with Work.
(a) By executing this Agreement, Contractor warrants that Contractor (i) has thoroughly investigated and considered the scope of work to be performed, (ii) has carefully considered the manner in which the services should be performed, and (iii) fully understands the facilities, difficulties, and restrictions regarding performance of the services under this Agreement.

If the services involve work upon any site, Contractor warrants that Contractor has or will investigate the site and is or will be fully acquainted with the conditions there existing prior to the commencement of services hereunder.
(b) Contractor shall promptly, and before the following conditions are disturbed, notify the City, in writing, of any: (i) material Contractor believes may be hazardous waste as defined in Section 25117 of the Health & Safety Code required to be removed to a Class I, II, or III disposal site in accordance with existing law; (ii) subsurface, unknown or latent conditions, materially different from those indicated; or (iii) unknown physical conditions at the site of any unusual nature, different from those ordinarily encountered and generally recognized as inherent in work of the character provided for in this Agreement, and will materially affect the performance of the services hereunder.
(c) City shall promptly investigate the conditions, and if it finds that the conditions do materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor's cost of, or the time required for, performance of any part of the work, shall issue a change order per Section 1.10 of this Agreement.
(d) In the event that a dispute arises between City and Contractor regarding whether the conditions materially differ, involve hazardous waste, or cause a decrease or increase in Contractor's cost of, or time required for performance of any part of the work, Contractor shall not be excused from any scheduled completion date set, but shall proceed with all work to be performed under the Agreement. Contractor shall retain any and all rights provided

Page 568 of 881 ends

01257.0006/1012751.1
either by contract or by law, which pertain to the resolution of disputes and protests between the contracting parties.
(e) City will compensate Contractor to the extent required by Government Code Section 4215 by issuing a change order per Section 1.10 of this Agreement.

1.7 Protection and Care of Work and Materials.

The Contractor shall adopt reasonable methods, including providing and maintaining storage facilities, during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as caused by City’s own negligence. Stored materials shall be reasonably accessible for City inspection. Contractor shall not, without City’s consent, assign, sell, mortgage, hypothecate, or remove equipment or materials which have been installed or delivered and which may be necessary for the completion of the work as specified within this Agreement.

1.8 Warranty.

Contractor warrants all work under this Agreement (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any nonconforming materials incorporated into the work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Agreement or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the work, whichever is later) after the date of final acceptance, Contractor shall within ten (10) days after being notified in writing by the City of any defect in the work or nonconformance of the work to the Agreement, commence and prosecute with due diligence all work necessary to fulfill the terms of the warranty at Contractor’s sole cost and expense. Contractor shall act as soon as requested by the City in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair, remove, and replace any portions of the work (or work of other contractors) damaged by its defective work or which becomes damaged in the course of repairing or replacing said defective work. For any work so corrected, Contractor's obligation hereunder to correct defective work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected work. Contractor shall perform such tests as the City may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Agreement. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of the Contractor. All warranties and guarantees of subcontractors, suppliers, and manufacturers with respect to any portion of the work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the City, regardless of whether or not such warranties and guarantees have been transferred or assigned to the City by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the City. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Agreement, to the reasonable satisfaction of the City, the City shall have the right to correct and replace any defective or non-conforming work

Page 569 of 881 ends

01257.0006/1012751.1
and any work damaged by such work or the replacement or correction thereof at Contractor's sole expense. Contractor shall be obligated to fully reimburse the City for any expenses incurred hereunder upon demand.

1.9 Further Responsibilities of Parties.

Both parties agree to use reasonable care and diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all instruments, prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of this Agreement. Unless hereafter specified, neither party shall be responsible for the services of the other.

1.10 Additional Work and Change Orders.
(a) City shall have the right at any time during the performance of the services of this Agreement, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Work or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written change order is first given by the Contract Officer to the Contractor, incorporating therein any adjustment in (i) the Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Contractor (“Change Order”). All Change Orders must be signed by the Contractor and Contract Officer prior to commencing the extra work thereunder. (b) Any increase in compensation of up to ten percent (10%) of the Contract Sum or $25,000, whichever is less, or any increase in the time to perform of up to one hundred eighty (180) days, and does not materially affect the Work and which are not detrimental to the Work or to the interest of the City, may be approved by the City’s Contract Officer. Any greater increases, taken either separately or cumulatively, must be approved by the City Council. (c) Any adjustment in the Contract Sum for a Change Order must be in accordance with the rates as set forth in the Schedule of Compensation enclosed herein as Exhibit “C”. If the rates in the Schedule of Compensation do not cover the type of work specified within the Change Order, the cost of such work shall not exceed an amount agreed upon in writing and signed by Contractor and City’s Contract Officer. If the cost of the Change Order cannot be agreed upon, the City will pay for actual work of the Change Order completed, to the satisfaction of the City, as follows:
(i) Labor: the cost of labor shall be the actual cost for wages of workers and subcontractors performing the work for the Change Order at the time such work is done. The use of labor classifications that would increase the cost of such work shall not be permitted.
(ii) Materials and Equipment: the cost of materials and equipment shall be at cost to Contractor or lowest current price which such materials and equipment are reasonably available at the time the work is done, whichever is lower. (iii) If the cost of the extra work cannot be agreed upon, the Contractor must provide a daily report that includes invoices for labor, materials, and equipment

Page 570 of 881 ends

01257.0006/1012751.1
costs for the work under the Change Order. The daily report must include a: list of names of workers, classifications, and hours worked; description and list of quantities of materials used; type of equipment, size, identification number, and hours of operation, including loading and transportation, if applicable; description of other City authorized services and expenditures in such detail as the City may reasonably require. Failure to submit a daily report by the close of the next working day may, at the City’s sole and absolute discretion, waive the Contractor’s right to payment for that day.
(d) It is expressly understood by Contractor that the provisions of this Section 1.10 shall not apply to services specifically set forth within the Scope of Work. Contractor hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of Work may be more costly or time consuming than Contractor anticipates and that Contractor shall not be entitled to additional compensation therefor. City may in its sole and absolute discretion have similar work done by other contractors. (e) No claim for an increase in the Contract Sum or time for performance shall be valid unless the procedures established within this Section are followed.

1.11 Special Requirements.

Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the “Special Requirements” attached hereto as Exhibit “B” and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit “B” and any other provisions of this Agreement, the provisions of Exhibit “B” shall govern.

ARTICLE 2. COMPENSATION AND METHOD OF PAYMENT.

2.1 Contract Sum.

Subject to any limitations set forth in this Agreement, City agrees to pay Contractor the amounts specified in the “Schedule of Compensation” attached hereto as Exhibit “C” and incorporated herein by this reference. The total compensation, including reimbursement for actual expenses, shall not exceed One Hundred Forty Eight Thousand Seven Hundred Fifty Six Thousand Dollars and Seventy Two Cents ($148,756.72) (the “Contract Sum”), unless additional compensation is approved pursuant to Section 1.10.

2.2 Method of Compensation.

The method of compensation may include: (i) a lump sum payment upon completion of services; (ii) payment in accordance with specified tasks or the percentage of completion of the services less the contract retention; (iii) payment for time and materials based upon the Contractor’s rates as specified in the Schedule of Compensation, provided that (a) time estimates are provided for the performance of sub tasks, (b) contract retention is maintained and (c) the Contract Sum is not exceeded; or (iv) such other methods as may be specified in the Schedule of Compensation.

Page 571 of 881 ends

01257.0006/1012751.1

2.3 Reimbursable Expenses.

Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, telephone expenses, and travel expenses approved by the Contract Officer in advance, or actual subcontractor expenses of an approved subcontractor pursuant to Section 4.5, and only if specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Contractor at all project meetings reasonably deemed necessary by the City.

Contractor acknowledges and agrees that coordination of the performance of the work with City is a critical component of the services. If Contractor is required to attend additional meetings to facilitate such coordination, Contractor acknowledges and agrees that it shall not be entitled to any additional compensation for required attendance.

2.4 Invoices.

Each month Contractor shall furnish to City an original invoice for all work performed and expenses incurred during the preceding month in a form approved by the City’s Director of Finance. By submitting an invoice for payment under this Agreement, Contractor is certifying compliance with all provisions of the Agreement. The invoice shall contain all information specified in Exhibit “C”, and shall detail charges for all necessary and actual expenses by the following categories: labor (by sub-category), travel, materials, equipment, supplies, and sub-contractor contracts. Sub-contractor charges shall also be detailed by such categories.

Contractor shall not invoice City for any duplicate services performed by more than one person.

City shall, as soon as practicable, independently review each invoice submitted by the Contractor to determine whether the work performed and expenses incurred are compliant with the provisions of this Agreement. Except as to any charges for work performed or expenses incurred by Contractor which are disputed by City, or as provided in Section 7.3, City will cause Contractor to be paid within thirty (30) days of receipt of Contractor’s correct and undisputed invoice; however, Contractor acknowledges and agrees that due to City warrant run procedures, the City cannot guarantee that payment will occur within this time period. In the event that City does not cause Contractor to be paid within thirty (30) days of receipt of an undisputed and properly submitted invoice, Contractor shall be entitled to the payment of interest to the extent allowed under Public Contract Code Section 20104.50. In the event any charges or expenses are disputed by City, the original invoice shall be returned to the Contractor, not later than seven (7) days after receipt by the City, for correction and resubmission. Returned invoices shall be accompanied by a document setting forth in writing the reasons why the payment request was rejected. Review and payment by the City of any invoice provided by the Contractor shall not constitute a waiver of any rights or remedies provided herein or any applicable law.

2.5 Waiver.

Payment to Contractor for work performed pursuant to this Agreement shall not be deemed to waive any defects in work performed by Contractor.

Page 572 of 881 ends

01257.0006/1012751.1
ARTICLE 3. PERFORMANCE SCHEDULE

3.1 Time of Essence.

Time is of the essence in the performance of this Agreement.

3.2 Schedule of Performance.

Contractor shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the “Schedule of Performance” attached hereto as Exhibit “D” and incorporated herein by this reference. When requested by the Contractor, extensions to the time period(s) specified in the Schedule of Performance may be approved in writing by the Contract Officer but may not exceed one hundred eighty (180) days cumulatively.

3.3 Force Majeure.

The time period(s) specified in the Schedule of Performance pursuant to this Agreement shall be extended as a result of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Contractor shall within ten (10) days of the commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified. The Contract Officer’s determination shall be final and conclusive upon the parties to this Agreement. In no event shall Contractor be entitled to recover damages against the City for any delay in the performance of this Agreement, however caused, Contractor’s sole remedy being extension of the Agreement pursuant to this Section.

3.4 Inspection and Final Acceptance.

City may inspect and accept or reject any of Contractor’s work under this Agreement, either during performance or when completed. City shall reject or finally accept Contractor’s work within forty-five (45) days after submitted to City. City shall accept Contractor’s work with a timely written acceptance, otherwise work shall be deemed to have been rejected. City’s acceptance shall be conclusive as to such work except with respect to latent defects, fraud, and such gross mistakes as to amount to fraud. Acceptance of any work by City shall not constitute a waiver of any of the provisions of this Agreement including, but not limited to, Articles 1 and 5, pertaining to warranty and indemnification and insurance, respectively.

3.5 Term.

Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding September 30, 2025 from the date hereof, except as otherwise provided in the Schedule of Performance (Exhibit “D”).

Page 573 of 881 ends

01257.0006/1012751.1
ARTICLE 4. COORDINATION OF WORK

4.1 Representatives and Personnel of Contractor.

The following principals of Contractor (“Principals”) are hereby designated as being the principals and representatives of Contractor authorized to act on its behalf with respect to the work specified herein and make all decisions in connection therewith:

Ronald Durna _____________ President_________________
(Name) (Title)
Neshtinscka Durna _________ Secretary_________________
(Name) (Title)
________________________ ________________________
(Name) (Title)
It is expressly understood that the experience, knowledge, capability, and reputation of the foregoing Principals were a substantial inducement for City to enter into this Agreement. Therefore, the Principals shall be responsible during the term of this Agreement for directing all activities of Contractor and devoting sufficient time to personally supervise the services hereunder. All personnel of Contractor, and any authorized agents, shall at all times be under the exclusive direction and control of the Principals. For purposes of this Agreement, the Principals may not be replaced nor may their responsibilities be substantially reduced by Contractor without the express written approval of City. Additionally, Contractor shall make every reasonable effort to maintain the stability and continuity of Contractor’s staff and subcontractors, if any, assigned to perform the services required under this Agreement. Contractor shall timely notify City of any changes in Contractor’s staff and subcontractors, if any are assigned to perform the services required under this Agreement, prior to and during any such performance.

4.2 Status of Contractor.

Contractor shall have no authority to bind City in any manner, or to incur any obligation, debt or liability of any kind on behalf of or against City, whether by contract or otherwise, unless such authority is expressly conferred under this Agreement or is otherwise expressly conferred in writing by City. Contractor shall not at any time or in any manner represent that Contractor or any of Contractor’s officers, employees, or agents are in any manner officials, officers, employees, or agents of City. Neither Contractor, nor any of Contractor’s officers, employees, or agents, shall obtain any rights to retirement, health care or any other benefits which may otherwise be accrued by City’s employees. Contractor expressly waives any claim Contractor may have to any such rights.

4.3 Contract Officer.

The Contract Officer shall be Andres Gonzalez (Senior Public Works Analyst), Jose Figueroa (Public Works Supervisor), or such person as designated by the City Manager. It shall be the Contractor’s responsibility to assure that the Contract Officer is kept informed of the

Page 574 of 881 ends

01257.0006/1012751.1
progress of the performance of the services and the Contractor shall refer any decisions which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority, if specified in writing by the City Manager, to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement.

4.4 Independent Contractor.

Neither the City nor any of its employees shall have any control over the manner, mode or means by which Contractor, its agents or employees, performs the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of Contractor’s employees, servants, representatives or agents, or in fixing their number, compensation or hours of service. Contractor shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Contractor shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Contractor in its business or otherwise, or a joint venturer, or a member of any joint enterprise with Contractor.

4.5 Prohibition Against Subcontracting or Assignment.

The experience, knowledge, capability, and reputation of Contractor, its Principals and employees were a substantial inducement for the City to enter into this Agreement. Therefore, Contractor shall not contract with any other entity to perform in whole or in part the services required hereunder without the express written approval of the City. All subcontractors shall obtain, at its or Contractor’s expense, such licenses, permits, registrations, and approvals (including from the City) as may be required by law for the performance of any and all services or work to be performed under this Agreement. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without the express consent of City.

ARTICLE 5. INSURANCE, INDEMNIFICATION, AND BONDS

5.1 Insurance Coverages.

Without limiting Contractor’s indemnification of City, and prior to the commencement of any services under this Agreement, Contractor shall obtain, provide, and maintain at its own expense, during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to City.

Page 575 of 881 ends

01257.0006/1012751.1
(a) General Liability Insurance. Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO "insured contract" language will not be accepted. (b) Automobile Liability Insurance. Contractor shall maintain automobile insurance with coverages at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the Contractor arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned, or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.
(c) Professional Liability Insurance (Errors & Omissions). Contractor shall maintain professional liability insurance that covers the Services to be performed in connection with this Agreement, in the minimum amount of $1,000,000 per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this Agreement and Consultant agrees to maintain continuous coverage through a period no less than three (3) years after completion of the services required by this Agreement. (d) Workers’ Compensation Insurance. Contractor shall maintain Workers' Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for Contractor’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, Contractor shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees. Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its officers, agents, employees, and volunteers.
(e) Builder’s Risk (Course of Construction). Upon commencement of construction and with approval of City, Contractor shall obtain and maintain builder’s risk (course of construction) for the entire duration of the project until only the City has an insurable interest.

The builder’s risk coverage shall include the coverages as specified.

The named insureds shall be Contractor and City, including its officers, officials, employees, and agents. All subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insured as their interests may appear.

Contractor shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to City. The policy shall contain a provision that all proceeds from the builder’s risk policy shall be made payable to the City. The City will act as a fiduciary for all other interests in the Project.

Policy shall be provided for replacement value on an “all risk” basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision un any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship,

Page 576 of 881 ends

01257.0006/1012751.1
Nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insurance the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to City to ensure adequacy of terms and sublimits and shall be submitted to the City prior to commencement of construction.
(f) Installation Floaters. If required by the City or not covered by the builders’ risk (course of construction) coverage, Contractor shall obtain an installation floater for the value of the property and covering the portion of the work to be constructed, installed, altered, or repaired by the Contractor. The installation floater policy must include coverage for the fixtures, materials, supplies, machinery, and equipment used in or incidental to the construction project as well as property kept off-site or while in transit. Coverage must include property of others in the Contractor’s care, custody, or control. In addition to Contractor, the City and all subcontractors shall be named as additional insureds on the policy with coverage extending through the final completion date.
(g) Subcontractors. Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and certified endorsements for each subcontractor. All coverages for subcontractors shall include all of the requirements stated herein. (h) Additional Insurance. Policies of such other insurance, as may be required in the Special Requirements in Exhibit “B”.
(i) Contractor’s Pollution Liability Insurance. Coverage shall provide for liability arising out of sudden, accidental, and gradual pollution, and remediation. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. All activities contemplated in this agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for remediation of the site in the event of an environmental contamination event arising out of the materials, supplies, products, work, operations, or workmanship.

5.2 General Insurance Requirements.
(a) Proof Of Insurance. Contractor shall provide certificates of and required endorsements to City as evidence of the insurance coverage required herein. Insurance certificates and endorsements must be approved by the City’s Risk Manager prior to commencement of performance. Current certification of insurance shall be kept on file with City for the contract period and any additional length of time required thereafter. City reserves the right to require complete, certified copies of all required insurance policies, at any time. (b) Duration Of Coverage. Contractor shall procure and maintain for the contract period, and any additional length of time required thereafter, insurance against claims for

Page 577 of 881 ends

01257.0006/1012751.1
injuries to persons or damages to property, or financial loss which may arise from or in connection with the performance of the Work hereunder by Contractor, their agents, representatives, employees. or subconsultants. Contractor must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims.

Agency and its officers, officials, employees, and agents shall continue as additional insureds under such policies.
(c) Primary/Noncontributing. Coverage provided by Contractor shall be primary and any insurance or self-insurance procured or maintained by City shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and noncontributing basis for the benefit of City before City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
(d) Umbrella or Excess Liability Insurance. Contractor shall obtain and maintain an umbrella liability insurance policy with limits that will provide bodily injury, personal injury, and property damage liability coverage, including commercial general liability, automobile liability, and employer’s liability. Such policy or policies shall include the following terms and conditions: (1) A drop-down feature requiring the policy to respond if any primary insurance that would otherwise have applied proves to be uncollectible in whole or in part for any reason; (2) “pay on behalf of” wording as opposed to “reimbursement;” and (3) concurrency of effective dates with primary policies. Umbrella or excess liability insurance shall be excess over commercial general liability, automobile liability, and employer’s liability policies. (e) Products/Completed Operations Coverage. Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The City, its officials, officers, agents, and employees, shall be included as additional insureds under the Products and Completed Operations coverage.
(f) City’s Rights Of Enforcement. In the event any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Contractor or City will withhold amounts sufficient to pay the premium from Contractor payments. In the alternative, City may cancel this Agreement in its entirety.
(g) Acceptable Insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or that is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VI (or

Page 578 of 881 ends

01257.0006/1012751.1
larger) in accordance with the latest edition of “Best’s Key Rating Guide,” unless otherwise approved by the City’s Risk Manager.
(h) Waiver Of Subrogation. All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive subrogation against City, its elected or appointed officers, agents, officials, employees, and volunteers or shall specifically allow Contractor or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Contractor hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subcontractors.
(i) Enforcement Of Contract Provisions (Non-Estoppel). Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform Contractor of non-compliance with any requirement imposes no additional obligations on the City nor does it waive any rights hereunder.
(j) Requirements Not Limiting. Requirements of specific coverage features or limits contained in this section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided for by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the Contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverages shall be available to the City. (k) Notice Of Cancellation. Contractor agrees to oblige its insurance agent or broker and insurers to provide to City with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage. If any of the Contractor’s insurers are unwilling to provide such notice, then Contractor shall have the responsibility of notifying the City immediately in the event of Contractor’s failure to renew any of the required insurance coverages, or insurer’s cancellation or non-renewal.
(l) Additional Insured Status. General liability, automobile liability, and umbrella/excess liability insurance policies shall provide or be endorsed to provide that City and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies.
(m) Prohibition Of Undisclosed Coverage Limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing.
(n) Separation Of Insureds. A severability of interests provision must apply for all additional insureds ensuring that Contractor’s insurance shall apply separately to each

Page 579 of 881 ends

01257.0006/1012751.1
insured against whom a claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions. (o) Pass Through Clause. Contractor agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project/service by Contractor (hereinafter collectively “subcontractor”), provide the same minimum insurance coverage and endorsements required of Contractor. Contractor agrees to monitor and review all such coverages and assumes all responsibility for ensuring that such coverages are provided in conformity with the requirements of this section. However, in the event Contractor’s subcontractor cannot comply with this requirement, which proof must be submitted to the City, Contractor shall be required to ensure that its subcontractor provide and maintain insurance coverage and endorsements sufficient to the specific risk of exposure involved with subcontractor’s scope of work and services, with limits less than required of the Contractor, but in all other terms consistent with the Contractor’s requirements under this Agreement. This provision does not relieve the Contractor of its contractual obligations under the Agreement and/or limit its liability to the amount of insurance coverage provided by its subcontractors. This provision is intended solely to provide Contractor with the ability to utilize a subcontractor who may be otherwise qualified to perform the work or services but may not carry the same insurance limits as required of the Contractor under this Agreement given the limited scope of work or services provided by the subcontractor. Contractor agrees that upon request, all agreements with subcontractors, and others engaged in the project, will be submitted to City for review. (p) City’s Right To Revise Requirements. The City reserves the right at any time during the term of the contract to change the amounts and types of insurances required by giving the Contractor ninety (90) day advance written notice of such change. If such change results in substantial additional cost to the Contractor, the City and Contractor may renegotiate Contractor's compensation.
(q) Self-Insured Retentions. Any self-insured retentions must be declared to and approved by City. City reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible, or require proof of ability to pass losses and related investigations, claim administration, and defense expenses within the retention through confirmation from the underwriter. Self-insurance will not be considered to comply with these specifications unless approved by City.
(r) Timely Notice Of Claims. Contractor shall give City prompt and timely notice of claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
(s) Additional Insurance. Contractor shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the work.

Page 580 of 881 ends

01257.0006/1012751.1

5.3 Indemnification.

To the full extent permitted by law, Contractor agrees to indemnify, defend and hold harmless the City, its officers, employees, and agents (“Indemnified Parties”) against, and will hold and save them and each of them harmless from, any and all actions, either judicial, administrative, arbitration or regulatory claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities whether actual or threatened (herein “claims or liabilities”) that may be asserted or claimed by any person, firm or entity arising out of or in connection with the negligent performance of the work, operations or activities provided herein of Contractor, its officers, employees, agents, subcontractors, or invitees, or any individual or entity for which Contractor is legally liable (“indemnitors”), or arising from Contractor’s or indemnitors’ reckless or willful misconduct, or arising from Contractor’s or indemnitors’ negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, and in connection therewith:
(a) Contractor will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys’ fees incurred in connection therewith;
(b) Contractor will promptly pay any judgment rendered against the City, its officers, agents, or employees for any such claims or liabilities arising out of or in connection with the negligent performance of or failure to perform such work, operations or activities of Contractor hereunder; and Contractor agrees to save and hold the City, its officers, agents, and employees harmless therefrom;
(c) In the event the City, its officers, agents or employees is made a party to any action or proceeding filed or prosecuted against Contractor for such damages or other claims arising out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Contractor hereunder, Contractor agrees to pay to the City, its officers, agents, or employees, any and all costs and expenses incurred by the City, its officers, agents, or employees in such action or proceeding, including but not limited to, legal costs and attorneys’ fees.

In addition, Contractor agrees to indemnify, defend and hold harmless the Indemnified Parties from, any and all claims and liabilities, for any infringement of patent rights, copyrights or trademark on any person or persons in consequence of the use by the Indemnified Parties of articles to be supplied by Contractor under this Agreement, and of which the Contractor is not the patentee or assignee or has not the lawful right to sell the same.

Contractor shall incorporate similar indemnity agreements with its subcontractors and if it fails to do so Contractor shall be fully responsible to indemnify City hereunder therefore, and failure of City to monitor compliance with these provisions shall not be a waiver hereof. This indemnification includes claims or liabilities arising from any negligent or wrongful act, error or omission, or reckless or willful misconduct of Contractor in the performance of professional services and work hereunder. The provisions of this Section do not apply to claims or liabilities occurring as a result of City’s sole negligence or willful acts or omissions, but, to the fullest extent permitted by law, shall apply to claims and liabilities resulting in part from City’s negligence,

Page 581 of 881 ends

01257.0006/1012751.1
except that design professionals’ indemnity hereunder shall be limited to claims and liabilities arising out of the negligence, recklessness, or willful misconduct of the design professional. The indemnity obligation shall be binding on successors and assigns of Contractor and shall survive termination of this Agreement.

5.4 Notification of Third-Party Claims.

City shall timely notify Contractor of the receipt of any third-party claim relating to the work under this Agreement. City shall be entitled to recover from Contractor its reasonable costs incurred in providing such notification.

5.5 Performance and Labor Bonds.

Concurrently with execution of this Agreement Contractor shall deliver to the City, the following:
(a) A performance bond in the amount of the Contract Sum of this Agreement, in the form provided by the City Clerk, which secures the faithful performance of this Agreement.
(b) A labor and materials bond in the amount of the Contract Sum of this Agreement, in the form provided by the City Clerk, which secures the payment of all persons furnishing labor and/or materials in connection with the work under this Agreement.

Both the performance and labor bonds required under this Section 5.5 shall contain the original notarized signature of an authorized officer of the surety and affixed thereto shall be a certified and current copy of his power of attorney. The bond shall be unconditional and remain in force during the entire term of the Agreement and shall be null and void only if the Contractor promptly and faithfully performs all terms and conditions of this Agreement and pays for all labor and materials for work and services performed under this Agreement.

5.6 Sufficiency of Insurer or Surety.

Insurance and bonds required by this Agreement shall be satisfactory only if issued by companies qualified to do business in California, rated “A” or better in the most recent edition of “Best’s Rating Guide,” “The Key Rating Guide” or in the Federal Register, and only if they are of a financial category Class VII or better, unless such requirements are waived by the City’s Risk Manager (“Risk Manager”) due to unique circumstances. If this Agreement continues for more than three (3) years duration, or in the event the Risk Manager determines that the work or services to be performed under this Agreement create an increased or decreased risk of loss to the City, the Contractor agrees that the minimum limits of the insurance policies and the performance bond required by Section 5.5 may be changed accordingly upon receipt of written notice from the Risk Manager.

5.7 Substitution of Securities.

Pursuant to Public Contract Code Section 22300, substitution of eligible equivalent securities for any funds withheld to ensure performance under this Agreement may be permitted

Page 582 of 881 ends

01257.0006/1012751.1
at the request and sole expense of the Contractor. Alternatively, the Contractor may, pursuant to an escrow agreement in a form prescribed by Public Contract Code Section 22300, request payment of retentions funds earned directly to the escrow agent at the sole expense of the Contractor.

5.8 Release of Securities.

City shall release the Performance and Labor Bonds when the following have occurred:
(a) Contractor has made a written request for release and provided evidence of satisfaction of all other requirements under Article 5 of this Agreement; (b) the work has been accepted; and
(c) after passage of the time within which lien claims are required to be made pursuant to applicable laws; if lien claims have been timely filed, City shall hold the Labor Bond until such claims have been resolved, Contractor has provided statutory bond, or otherwise as required by applicable law.

ARTICLE 6. RECORDS, REPORTS, AND RELEASE OF INFORMATION

6.1 Records.

Contractor shall keep, and require subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports, studies, certified and accurate copies of payroll records in compliance with all applicable laws, or other documents relating to the disbursements charged to City and services performed hereunder (the “books and records”), as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the performance of such services. Any and all such documents shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of three (3) years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required. In the event of dissolution of Contractor’s business, custody of the books and records may be given to City, and access shall be provided by Contractor’s successor in interest. Notwithstanding the above, the Contractor shall fully cooperate with the City in providing access to the books and records if a public records request is made and disclosure is required by law including but not limited to requests made in accordance with the California Public Records Act.

6.2 Reports.

Contractor shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as requested by the Contract Officer. Contractor hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Contractor agrees that if Contractor becomes aware of any facts, circumstances, techniques, or events that

Page 583 of 881 ends

01257.0006/1012751.1
may or will materially increase or decrease the cost of the work or services contemplated herein or, if Contractor is providing design services, the cost of the project being designed, Contractor shall promptly notify the Contract Officer of said fact, circumstance, technique, or event and the estimated increase or decrease of costs related thereto and, if Contractor is providing design services, the estimated increased or decreased cost estimate for the project being designed.

6.3 Ownership of Documents.

All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents and other materials (the “documents and materials”) prepared by Contractor, its employees, subcontractors, and agents in the performance of this Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer or upon the termination of this Agreement, and Contractor shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the documents and materials hereunder. Any use, reuse or assignment of such completed documents for other projects and/or use of uncompleted documents without specific written authorization by the Contractor will be at the City’s sole risk and without liability to Contractor, and Contractor’s guarantee and warranties shall not extend to such use, reuse or assignment. Contractor may retain copies of such documents for its own use.

Contractor shall have an unrestricted right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Contractor fails to secure such assignment, Contractor shall indemnify City for all damages resulting therefrom. Moreover, Contractor with respect to any documents and materials that may qualify as “works made for hire” as defined in 17 U.S.C. § 101, such documents and materials are hereby deemed “works made for hire” for the City.

6.4 Confidentiality and Release of Information.
(a) Information gained or work product produced by Contractor in performance of this Agreement shall be considered confidential, unless such information is in the public domain or already known to Contractor. Contractor shall not release or disclose any such information or work product to persons or entities other than City without prior written authorization from the Contract Officer.
(b) Contractor, its officers, employees, agents or subcontractors, shall not, without prior written authorization from the Contract Officer or unless requested by the City Attorney, voluntarily provide documents, declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the work performed under this Agreement. Response to a subpoena or court order shall not be considered "voluntary" provided Contractor gives City notice of such court order or subpoena. (c) If Contractor, or any officer, employee, agent or subcontractor of Contractor, provides any information or work product in violation of this Agreement, then City shall have the right to reimbursement and indemnity from Contractor for any damages, costs and fees, including attorneys’ fees, caused by or incurred as a result of Contractor’s conduct.

Page 584 of 881 ends

01257.0006/1012751.1
(d) Contractor shall promptly notify City should Contractor, its officers, employees, agents or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admission or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed there under. City retains the right, but has no obligation, to represent Contractor or be present at any deposition, hearing or similar proceeding. Contractor agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Contractor. However, this right to review any such response does not imply or provide the City with the right to control, direct, or rewrite said responses.

ARTICLE 7. ENFORCEMENT OF AGREEMENT AND TERMINATION

7.1 California Law.

This Agreement shall be interpreted, construed and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other appropriate court in such county, and Contractor covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. In the event of litigation in a U.S. District Court, venue shall lie exclusively in the Central District of California, in the County of Los Angeles, State of California.

7.2 Disputes.
(a) Default; Cure. In the event that Contractor is in default under the terms of this Agreement, the City shall not have any obligation or duty to continue compensating Contractor for any work performed after the date of default. Instead, the City may give notice to Contractor of the default and the reasons for the default. The notice shall include the timeframe in which Contractor may cure the default. This timeframe is presumptively thirty (30) days, but may be extended, though not reduced, if circumstances warrant. During the period of time that Contractor is in default, the City shall hold all invoices and shall proceed with payment on the invoices only when the default is cured. In the alternative, the City may, in its sole discretion, elect to pay some or all of the outstanding invoices during the period of default. If Contractor does not cure the default, the City may take necessary steps to terminate this Agreement under this Article.

Any failure on the part of the City to give notice of the Contractor’s default shall not be deemed to result in a waiver of the City’s legal rights or any rights arising out of any provision of this Agreement.
(b) Dispute Resolution. This contract is subject to the provisions of Article 1.5 (commencing at Section 20104) of Division 2, Part 3 of the California Public Contract Code regarding the resolution of public works claims of less than $375,000. Article 1.5 mandates certain procedures for the filing of claims and supporting documentation by the Contractor, for the response to such claims by the City, for a mandatory meet and confer conference upon the request of the Contractor, for mandatory non-binding mediation in the event litigation is commenced, and for mandatory judicial arbitration upon the failure to resolve the dispute through mediation. This Agreement hereby incorporates the provisions of Article 1.5 as though fully set forth herein.

Page 585 of 881 ends

01257.0006/1012751.1

7.3 Retention of Funds.

Contractor hereby authorizes City to deduct from any amount payable to Contractor (whether or not arising out of this Agreement) (i) any amounts the payment of which may be in dispute hereunder or which are necessary to compensate City for any losses, costs, liabilities, or damages suffered by City, and (ii) all amounts for which City may be liable to third parties, by reason of Contractor’s acts or omissions in performing or failing to perform Contractor’s obligation under this Agreement. In the event that any claim is made by a third party, the amount or validity of which is disputed by Contractor, or any indebtedness shall exist which shall appear to be the basis for a claim of lien, City may withhold from any payment due, without liability, for interest because of such withholding, an amount sufficient to cover such claim. The failure of City to exercise such right to deduct or to withhold shall not, however, affect the obligations of the Contractor to insure, indemnify, and protect City as elsewhere provided herein.

7.4 Waiver.

Waiver by any party to this Agreement of any term, condition, or covenant of this Agreement shall not constitute a waiver of any other term, condition, or covenant. Waiver by any party of any breach of the provisions of this Agreement shall not constitute a waiver of any other provision or a waiver of any subsequent breach or violation of any provision of this Agreement.

Acceptance by City of any work or services by Contractor shall not constitute a waiver of any of the provisions of this Agreement. No delay or omission in the exercise of any right or remedy by a non-defaulting party on any default shall impair such right or remedy or be construed as a waiver.

Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement.

7.5 Rights and Remedies are Cumulative.

Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party.

7.6 Legal Action.

In addition to any other rights or remedies, either party may take legal action, in law or in equity, to cure, correct, or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. Notwithstanding any contrary provision herein, Contractor shall file a claim pursuant to Government Code Sections 905 et seq., and 910 et seq., in order to pursue a legal action under this Agreement.

7.7 Liquidated Damages.

Since the determination of actual damages for any delay in performance of this Agreement would be extremely difficult or impractical to determine in the event of a breach of this Agreement, the Contractor and its sureties shall be liable for and shall pay to the City the sum

Page 586 of 881 ends

01257.0006/1012751.1
of $250.00 (Two Hundred Fifty Dollars) as liquidated damages for each working day of delay in the performance of any service required hereunder, as specified in the Schedule of Performance (Exhibit “D”). The City may withhold from any monies payable on account of services performed by the Contractor any accrued liquidated damages. Pursuant to Government Code Section 4215, Contractor shall not be assessed liquidated damages for delay in completion of the project when such delay was caused by the failure of the public agency or owner of the utility to provide for removal or relocation of utility facilities.

7.8 Termination Prior to Expiration of Term.

This Section shall govern any termination of this Contract except as specifically provided for in the following Section for termination for cause. The City reserves the right to terminate this Contract at any time, with or without cause, upon thirty (30) days’ written notice to Contractor, except that where termination is due to the fault of the Contractor, the period of notice may be a shorter period of time as determined by the Contract Officer. In addition, the Contractor reserves the right to terminate this Contract at any time, with or without cause, upon sixty (60) days’ written notice to City, except that where termination is due to the fault of the City, the period of notice may be a shorter period of time as determined by the Contractor. Upon receipt of any notice of termination, Contractor shall immediately cease all services hereunder except such as may be specifically approved by the Contract Officer. Except where the Contractor has initiated termination, the Contractor shall be entitled to compensation for all services rendered prior to the effective date of the notice of termination and for any services authorized by the Contract Officer thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, except as provided for in Section 7.3. In the event the Contractor has initiated termination, the Contractor shall be entitled to compensation only for the reasonable value of the work product actually produced hereunder. In the event of termination without cause pursuant to this Section, the terminating party need not provide the non-terminating party with the opportunity to cure pursuant to Section 7.2.

7.9 Termination for Default of Contractor.

If termination is due to the failure of the Contractor to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 7.2, take over the work and prosecute the same to completion by contract or otherwise, and the Contractor shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to the Contractor for the purpose of set-off or partial payment of the amounts owed to the City as previously stated.

7.10 Attorneys’ Fees.

If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney’s fees. Attorney’s fees shall include attorney’s fees on any appeal, and in addition a party entitled to attorney’s fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and all other

Page 587 of 881 ends

01257.0006/1012751.1
necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment.

7.11 Unfair Business Practices Claims.

In entering into this Agreement, Contractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials related to this Agreement. This assignment shall be made and become effective at the time the City renders final payment to the Contractor without further acknowledgment of the Parties.

ARTICLE 8. CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION

8.1 Non-Liability of City Officers and Employees.

No officer or employee of the City shall be personally liable to the Contractor, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Contractor or to its successor, or for breach of any obligation of the terms of this Agreement.

8.2 Conflict of Interest.

Contractor covenants that neither it, nor any officer or principal of its firm, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Contractor’s performance of services under this Agreement. Contractor further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent, or subcontractor without the express written consent of the Contract Officer. Contractor agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest or with the interests of City in the performance of this Agreement.

No officer or employee of the City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the Agreement which effects his financial interest or the financial interest of any corporation, partnership or association in which he is, directly or indirectly, interested, in violation of any State statute or regulation. The Contractor warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement.

8.3 Covenant Against Discrimination.

Contractor covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry, or other protected class in the performance of this Agreement. Contractor shall take affirmative action to insure that applicants are employed and

Page 588 of 881 ends

01257.0006/1012751.1
that employees are treated without regard to their race, color, creed, religion, sex, gender, sexual orientation, marital status, national origin, ancestry, or other protected class.

8.4 Unauthorized Aliens.

Contractor hereby promises and agrees to comply with all of the provisions of the Federal Immigration and Nationality Act, 8 U.S.C. § 1101 et seq., as amended, and in connection therewith, shall not employ unauthorized aliens as defined therein. Should Contractor so employ such unauthorized aliens for the performance of work and/or services covered by this Agreement, and should any liability or sanctions be imposed against City for such use of unauthorized aliens, Contractor hereby agrees to and shall reimburse City for the cost of all such liabilities or sanctions imposed, together with any and all costs, including attorneys' fees, incurred by City.

ARTICLE 9. MISCELLANEOUS PROVISIONS

9.1 Notices.

Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class U.S. mail, in the case of the City, to the City Manager and to the attention of the Contract Officer (with her/his name and City title), City of South El Monte, 1415 Santa Anita Avenue, South El Monte, California 91733, and in the case of the Contractor, to the person at the address designated on the execution page of this Agreement.

Either party may change its address by notifying the other party of the change of address in writing.

Notice shall be deemed communicated at the time personally delivered or in seventy-two (72) hours from the time of mailing if mailed as provided in this Section. All correspondence relating to this Agreement shall be serialized consecutively.

9.2 Interpretation.

The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of authorship of this Agreement or any other rule of construction which might otherwise apply.

9.3 Counterparts.

This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument.

9.4 Integration; Amendment.

This Agreement including the attachments hereto is the entire, complete, and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements, and understandings, if any, between the parties, and none shall be used to interpret this Agreement. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by the

Page 589 of 881 ends

01257.0006/1012751.1
Contractor and by the City Council. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void.

9.5 Severability.

In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless.

9.6 Warranty and Representation of Non-Collusion.

No official, officer, or employee of City has any financial interest, direct or indirect, in this Agreement, nor shall any official, officer, or employee of City participate in any decision relating to this Agreement which may affect his/her financial interest or the financial interest of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any corporation, partnership, or association in which (s)he is directly or indirectly interested, or in violation of any state or municipal statute or regulation. The determination of “financial interest” shall be consistent with state law and shall not include interests found to be “remote” or “noninterest” pursuant to Government Code Sections 1091 or 1091.5. Contractor warrants and represents that it has not paid or given, and will not pay or give, to any third party including, but not limited to, any City official, officer, or employee, any money, consideration, or other thing of value as a result or consequence of obtaining or being awarded any agreement.

Contractor further warrants and represents that (s)he/it has not engaged in any act(s), omission(s), or other conduct or collusion that would result in the payment of any money, consideration, or other thing of value to any third party including, but not limited to, any City official, officer, or employee, as a result of consequence of obtaining or being awarded any agreement. Contractor is aware of and understands that any such act(s), omission(s), or other conduct resulting in such payment of money, consideration, or other thing of value, will render this Agreement void and of no force or effect.

Contractor’s Authorized Initials _______

9.7 Corporate Authority.

The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors and assigns of the parties.

Page 590 of 881 ends

01257.0006/1012751.1
[SIGNATURES ON FOLLOWING PAGE]

Page 591 of 881 ends

01257.0006/1012751.1
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date and year first-above written.

CITY:

CITY OF SOUTH EL MONTE, a municipal
corporation
____________________________________
Rene Salas, City Manager
ATTEST:

Sabrina Muhne, Interim City Clerk
APPROVED AS TO FORM:

ALESHIRE & WYNDER, LLP
Anthony R. Taylor, City Attorney
CONTRACTOR:

SOUTHERN CALIFORNIA PRECISION
CONCRETE INC dba PRECISION

CONCRETE CUTTING
By:

Name: Ronald Durna
Title: President
By:

Name: Neshtinscka Durna
Title: Secretary
Address: 13089 Peyton Dr, #C235
Chino Hills Ca. 91709
If applicable, two corporate officer signatures required when Contractor is a corporation, with one signature required from each of the following groups: 1) Chairman of the Board, President or any Vice President; and 2) Secretary, any Assistant Secretary, Chief Financial Officer or any Assistant Treasurer.

Page 592 of 881 ends

01257.0006/1012751.1 A-1
EXHIBIT “A”

SCOPE OF WORK
I. Contractor shall perform all of the work and comply with all of the specifications and requirements in the “General Provisions” and “Special Provisions” included in the bid documents for the project entitled “Trip Hazard Repair Proposal”, including any documents or exhibits referenced therein.

II. Brief description of the work to be performed:

The Services include the remediation of concrete sidewalk trip hazards from 0.625" and up

2.5” in pre-designated work areas within the City. Remediation services must remove trip hazards completely, from one end of the raised sidewalk joint to the other, if applicable, leaving zero point of differential between concrete slabs. Any panels inspected and deemed not to be at a zero point differential shall be repaired to the required specifications at no additional cost to City.

III. In addition to the requirements of Section 6.2, during performance of the work, Contractor will keep the City apprised of the status of performance by delivering the following status reports:

A. Status reports and studies due upon City’s request.

IV. All work is subject to review and acceptance by the City, and must be revised by the Contractor without additional charge to the City until found satisfactory and accepted by City.

V. Contractor shall provide safe and continuous passage for pedestrian and vehicular traffic in accordance with the Work Area Traffic Control Handbook (WATCH), latest edition.

Page 593 of 881 ends

01257.0006/1012751.1 A-2
EXHIBIT “A-1”

MASTER SERVICES AGREEMENT BETWEEN

PRECISION CONCRETE CUTTING AND

THE CALIFORNIA JOINT POWERS INSURANCE AUTHORITY
Pursuant to the California Joint Powers Insurance Authority (“CJPIA”) Master Services Agreement, dated February 15, 2023, Contractor submitted a proposal to the City for sidewalk assessment and trip hazard removal services, attached hereto and incorporated herein by this reference as Exhibit A-1. This Master Services Agreement contains provision defining the scope of services and the price of those services.

Page 594 of 881 ends

01257.0006/1012751.1 B-1
EXHIBIT “B”

SPECIAL REQUIREMENTS
(Superseding Contract Boilerplate)
The Agreement is amended as provided herein. Deleted text is indicated in strikethrough and added text in bold italics.

Section 3.5, Term, shall be amended as follows:
“Unless earlier terminated in accordance with Article 7 of this Agreement, this Agreement shall continue in full force and effect until completion of the services but not exceeding September 30, 2025 from the date hereof, except as otherwise provided in the Schedule of Performance (Exhibit “D”). The City may, in its sole and absolute discretion, extend the term for one (1) additional year.”

Page 595 of 881 ends

01257.0006/1012751.1 D-1
EXHIBIT “C”

SCHEDULE OF COMPENSATION
I. Contractor shall perform all work at the rates on the Bid Sheet and at the rates listed in Exhibit A-1 submitted as part of Contractor’s Proposal, and listed below:

II. A retention of five percent (5%) shall be held from each payment as a contract retention to be paid as part of the final payment upon satisfactory completion of services.

III. Within the budgeted amounts for each item on the Bid Sheet, and with the approval of the Contract Officer, funds may be shifted from one item’s sub-budget to another so long as the Contract Sum is not exceeded per Section 2.1, unless Additional Work is approved per Section 1.10.

IV. The City will compensate Contractor for the Services performed upon submission of a valid invoice. Each invoice is to include:

A. Line items for all personnel describing the work performed, the number of hours worked, and the hourly rate.

B. Expenses. These rates are inclusive of all expenses. Contractor shall bear all other outof-pocket expenses, or any other costs related to the performance of services pursuant to this Agreement and shall not seek reimbursement of such expenses from City.

V. The total compensation for the Services shall not exceed the amount provided in Section 2.1 of this Agreement.

Page 596 of 881 ends

01257.0006/1012751.1 D-2
EXHIBIT “D”

SCHEDULE OF PERFORMANCE
I. Contractor shall perform all work timely in accordance with the following schedule:

The City and Contractor may reach a mutually-agreed upon completion date for the tasks listed under Exhibit A.I. depending on the tasks and the City’s requirements.

II. Contractor shall deliver the following tangible work products to the City by the following dates.

A. Status reports and studies due upon City’s request.

III. The Contract Officer may approve extensions for performance of the services in accordance with Section 3.2.

Page 597 of 881 ends

01257.0006/1012751.1

PERFORMANCE BOND
WHEREAS, the CITY OF SOUTH EL MONTE, (“City”), has awarded to __________________________________, as Contractor (“Principal”), a Contract for the work entitled and described as
follows:__________________________________________________; WHEREAS, the Contractor is required under the terms of said Contract to furnish a bond for the faithful performance of the Contract;
NOW, THEREFORE, we the undersigned Contractor and Surety, are held and firmly bound unto the City in the sum of ________________________________________ ($______________), this amount being not less than one hundred percent (100%) of the total Contract price, lawful money of the United States of America, for payment of which sum well and truly be made we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. In case suit is brought upon this bond, the Surety will pay a reasonable attorney’s fee to the City in an amount to be fixed by the court.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bound Contractor, or its heirs, executors, administrators, successors, or assigns, shall in all things stand and abide by, well and truly keep and perform all undertakings, terms, covenants, conditions, and agreements in the said Contract and any alteration thereof, made as therein provided, all within the time and in the manner designated and in all respects according to their true intent and meaning, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

FURTHER, the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or modification of the Contract Documents or of the work to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of such change, extension of time, alteration, or modification of the Contract Documents or of the work to be performed thereunder.

Executed on 20___.

PRINCIPAL
(Seal if Corporation) By
Title
(Attach Acknowledgment of Authorized Representative of Principal)

Page 598 of 881 ends

01257.0006/1012751.1
Any claims under this bond may be addressed to:
(name and address of Surety)
(name and address of Surety's agent for service
of
process in California, if different from above)
(telephone number of Surety's agent in California)
(Attach Acknowledgment)
SURETY
By
(Attorney-in-Fact)
APPROVED:
(Attorney for CITY)
NOTICE:

No substitution or revision to this bond form will be accepted. Sureties must be authorized to do business in and have an agent for service of process in California. Certified copy of Power of Attorney must be attached.

Page 599 of 881 ends

01257.0006/1012751.1

PAYMENT BOND
(Labor and Material Bond)
WHEREAS, the CITY OF SOUTH EL MONTE, (“City”), has awarded to __________________________________, as Contractor (“Principal”), a Contract for the work entitled and described as
follows:__________________________________________________; WHEREAS, said Contractor is required to furnish a bond in conjunction with said Contract, to secure the payment of claims of laborers, mechanics, material men, and other persons as provided by law;
NOW, THEREFORE, we the undersigned Contractor and Surety, are held and firmly bound unto the City in the sum of ________________________________________ ($______________), this amount being not less than one hundred percent (100%) of the total Contract price, lawful money of the United States of America, for payment of which sum well and truly be made we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. In case suit is brought upon this bond, the Surety will pay a reasonable attorney’s fee to the City in an amount to be fixed by the court.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if said Contractor, its heirs, executors, administrators, successors, assigns, or subcontractor fails to pay: (1) for any work, materials, services, provisions, provender, or other supplies, or for the use of implements of machinery, used in, upon, for, or about the performance of the work to be done, or for any work or labor thereon of any kind; (2) for work performed by any of the persons named in Civil Code Section 9100; (3) for any amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract; and/or (4) for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and/or its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, then the Surety herein will pay for the same in an amount not exceeding the sum specified in this bond, otherwise the above obligation shall be void.

This bond shall inure to the benefit of any of the persons named in Civil Code Section 9100 so as to give a right of action to such persons or their assigns in any suit brought upon the bond. Moreover, if the City or any entity or person entitled to file stop payment notices is required to engage the services of an attorney in connection with the enforcement of this bond, each shall be liable for the reasonable attorney's fees incurred, with or without suit, in addition to the above sum.

Said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or modification of the Contract Documents or of the work to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of such change, extension of time, alteration, or modification of the Contract Documents or of the work to be performed thereunder.

Page 600 of 881 ends

01257.0006/1012751.1
Executed on , 20____.

PRINCIPAL
(Seal if Corporation) By
Title
(Attach Acknowledgment of Authorized Representative of Principal) Any claims under this bond may be addressed to:
(name and address of Surety)
(name and address of Surety's agent for service
of process in California, if different from above)
(telephone number of Surety's agent in California)
(Attach Acknowledgment)
SURETY
By
(Attorney-in-Fact)
APPROVED:
(Attorney for CITY)
NOTICE:

No substitution or revision to this bond form will be accepted. Sureties must be authorized to do business in and have an agent for service of process in California. Certified copy of Power of Attorney must be attached.

Page 601 of 881 ends

01257.0006/1012751.1

WORKERS COMPENSATION INSURANCE CERTIFICATE
Description of Contract: City of SOUTH EL MONTE
Project: _____________________________________________
Type of Insurance: Workers' Compensation and
Employers' Liability Insurance
THIS IS TO CERTIFY that the following policy has been issued by the below-stated company in conformance with the requirements of Article 5 of the Contract and is in force at this time, and is in a form approved by the Insurance Commissioner.

The Company will give at least 30 days' written notice to the City and Engineer/Architect prior to any cancellation of said policy.

POLICY NUMBER EXPIRATION DATE LIMITS OF LIABILITY
Workers' Compensation:

Statutory Limits Under the Laws
of the State of California
Employers' Liability:
$_________________ Each Accident
$_________________ Disease - Policy Limit
$_________________ Disease - Each Employee
Named Insured (Contractor) Insurance Company
Street Number Street Number
City and State City and State
By
(Company Representative)
(SEE NOTICE ON NEXT PAGE)

Page 602 of 881 ends

01257.0006/1012751.1
Insurance Company Agent for Service
of Process in California:

Name
Agency
Street Number
City and State
Telephone Number
This certificate is issued as a matter of information only and confers no rights upon the certificate holder. This certificate does not amend, extend, or alter the coverage afforded by the policy listed herein.

This is to certify that the policy has been issued to the named insured for the policy period indicated, notwithstanding any requirement, term, or condition of any contract or other document with respect to which this certificate may be issued or may pertain, the insurance afforded by the policy described herein is subject to all the terms, exclusions, and conditions of such policy.

NOTICE:

No substitution or revision to the above certificate form will be accepted. If the insurance called for is provided by more than one insurance company, a separate certificate in the exact above form shall be provided for each insurance company.

Page 603 of 881 ends

01257.0006/1012751.1

ADDITIONAL INSURED ENDORSEMENT

COMPREHENSIVE GENERAL LIABILITY
Name and address of named insured (“Named Insured”)
Name and address of Insurance Company (“Company”)
General description of agreement(s), permit(s), license(s), and/or activity(ies) insured Notwithstanding any inconsistent statement in the policy to which this endorsement is attached (the “Policy”) or in any endorsement now or hereafter attached thereto, it is agreed as follows:

1. The
(“Public Agency”), its elected officials, officers, attorneys, agents, employees, and volunteers are additional insureds (the above named additional insureds are hereafter referred to as the “Additional Insureds”) under the Policy in relation to those activities described generally above with regard to operations performed by or on behalf of the Named Insured. The Additional Insureds have no liability for the payment of any premiums or assessments under the Policy.

2. The insurance coverages afforded the Additional Insureds under the Policy shall be primary insurance, and no other insurance maintained by the Additional Insureds shall be called upon to contribute with the insurance coverages provided by the Policy.

3. Each insurance coverage under the Policy shall apply separately to each Additional Insured against whom claim is made or suit is brought except with respect to the limits of the Company's liability.

4. Nothing in this contract of insurance shall be construed to preclude coverage of a claim by one insured under the policy against another insured under the policy. All such claims shall be covered as third-party claims, i.e., in the same manner as if separate policies had been issued to each insured. Nothing contained in this provision shall operate to increase or replicate the Company's limits of liability as provided under the policy.

5. The insurance afforded by the Policy for contractual liability insurance (subject to the terms, conditions and exclusions applicable to such insurance) includes liability assumed by the Named Insured under the indemnification and/or hold harmless provision(s) contained in or executed in conjunction with the written agreement(s) or permit(s) designated above, between the Named Insured and the Additional Insureds.

6. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits (except as the result of the payment of claims), or non-renewal except after written notice to Public Agency, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereof. In the event of Company's failure to comply with this notice provision, the policy as initially drafted will continue in full force and effect until compliance with this notice requirement.

7. Company hereby waives all rights of subrogation and contribution against the Additional Insureds, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to the perils insured against in relation to those activities described generally above with regard

Page 604 of 881 ends

01257.0006/1012751.1
to operations performed by or on behalf of the Named Insured regardless of any prior, concurrent, or subsequent active or passive negligence by the Additional Insureds.

8. It is hereby agreed that the laws of the State of California shall apply to and govern the validity, construction, interpretation, and enforcement of this contract of insurance.

9. This endorsement and all notices given hereunder shall be sent to Public Agency at:

City Manager, City of South El Monte, 1415 Santa Anita Avenue, South El Monte, California 91733

10. Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.

TYPE OF COVERAGES TO WHICH POLICY PERIOD LIMITS OF

THIS ENDORSEMENT ATTACHES FROM/TO LIABILITY

11. Scheduled items or locations are to be identified on an attached sheet. The following inclusions relate to the above coverages. Includes:
□ Contractual Liability □ Explosion Hazard
□ Owners/Landlords/Tenants □ Collapse Hazard
□ Manufacturers/Contractors □ Underground Property Damage □ Products/Completed Operations □ Pollution Liability
□ Broad Form Property Damage □ Liquor Liability
□ Extended Bodily Injury □
□ Broad Form Comprehensive □
General Liability Endorsement □

12. A □ deductible or □ self-insured retention (check one) of $ applies to all coverage(s) except:
(if none, so state). The deductible is applicable □ per claim or □ per occurrence (check one).

13. This is an □ occurrence or □ claims made policy (check one).

14. This endorsement is effective on at 12:01 a.m. and forms a part of Policy Number .

Page 605 of 881 ends

01257.0006/1012751.1
(signatures on following page)
I, (print name), hereby
declare under penalty of perjury under the laws of the State of California, that I have the authority to bind the Company to this endorsement and that by my execution hereof, I do so bind the Company.

Executed , 20
Signature of Authorized Representative
(Original signature only; no facsimile signature
Telephone No.: ( ) or initialed signature accepted)

Page 606 of 881 ends

01257.0006/1012751.1

ADDITIONAL INSURED ENDORSEMENT

AUTOMOBILE LIABILITY
Name and address of named insured (“Named Insured”)
Name and address of Insurance Company (“Company”)
General description of agreement(s), permit(s), license(s), and/or activity(ies) insured Notwithstanding any inconsistent statement in the policy to which this endorsement is attached (the “Policy”) or in any endorsement now or hereafter attached thereto, it is agreed as follows:

1. The
(“Public Agency”), its elected officials, officers, attorneys, agents, employees, and volunteers are additional insureds (the above named additional insureds are hereafter referred to as the “Additional Insureds”) under the Policy in relation to those activities described generally above with regard to operations performed by or on behalf of the Named Insured. The Additional Insureds have no liability for the payment of any premiums or assessments under the Policy.

2. The insurance coverages afforded the Additional Insureds under the Policy shall be primary insurance, and no other insurance maintained by the Additional Insureds shall be called upon to contribute with the insurance coverages provided by the Policy.

3. Each insurance coverage under the Policy shall apply separately to each Additional Insured against whom claim is made or suit is brought except with respect to the limits of the Company's liability.

4. Nothing in this contract of insurance shall be construed to preclude coverage of a claim by one insured under the policy against another insured under the policy. All such claims shall be covered as third-party claims, i.e., in the same manner as if separate policies had been issued to each insured. Nothing contained in this provision shall operate to increase or replicate the Company's limits of liability as provided under the policy.

5. The insurance afforded by the Policy for contractual liability insurance (subject to the terms, conditions and exclusions applicable to such insurance) includes liability assumed by the Named Insured under the indemnification and/or hold harmless provision(s) contained or executed in conjunction with the written agreement(s) or permit(s) designated above, between the Named Insured and the Additional Insureds.

6. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits (except as the result of the payment of claims), or non-renewal except after written notice to Public Agency, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereto. In the event of Company's failure to comply with this notice provision, the policy as initially drafted will continue in full force and effect until compliance with this notice requirement.

7. Company hereby waives all rights of subrogation and contribution against the Additional Insureds, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to the perils insured against in relation to those activities described generally above with regard

Page 607 of 881 ends

01257.0006/1012751.1
to operations performed by or on behalf of the Named Insured regardless of any prior, concurrent, or subsequent active or passive negligence by the Additional Insureds.

8. It is hereby agreed that the laws of the State of California shall apply to and govern the validity, construction, interpretation, and enforcement of this contract of insurance.

9. This endorsement and all notices given hereunder shall be sent to Public Agency at:

City Manager
City of SOUTH EL MONTE
1415 Santa Anita Avenue
SOUTH EL MONTE, California 91733

10. Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.

TYPE OF COVERAGES TO WHICH POLICY PERIOD LIMITS OF

THIS ENDORSEMENT ATTACHES FROM/TO LIABILITY

11. Scheduled items or locations are to be identified on an attached sheet. The following inclusions relate to the above coverages. Includes:
□ Any Automobiles □ Truckers Coverage
□ All Owned Automobiles □ Motor Carrier Act
□ Non-owned Automobiles □ Bus Regulatory Reform Act
□ Hired Automobiles □ Public Livery Coverage
□ Scheduled Automobiles □
□ Garage Coverage □

12. A □ deductible or □ self-insured retention (check one) of $ applies to all coverage(s) except: (if none, so state). The deductible is applicable □ per claim or □ per occurrence (check one).

13. This is an □ occurrence or □ claims made policy (check one).

14. This endorsement is effective on at 12:01 a.m. and forms a part of Policy Number . (signatures on following page)

Page 608 of 881 ends

01257.0006/1012751.1
I, (print name), hereby
declare under penalty of perjury under the laws of the State of California, that I have the authority to bind the Company to this endorsement and that by my execution hereof, I do so bind the Company.

Executed , 20
Signature of Authorized Representative
(Original signature only; no facsimile signature
Telephone No.: ( ) or initialed signature accepted)

Page 609 of 881 ends

01257.0006/1012751.1

ADDITIONAL INSURED ENDORSEMENT

EXCESS LIABILITY
Name and address of named insured (“Named Insured”)
Name and address of Insurance Company (“Company”)
General description of agreement(s), permit(s), license(s), and/or activity(ies) insured Notwithstanding any inconsistent statement in the policy to which this endorsement is attached (the “Policy”) or in any endorsement now or hereafter attached thereto, it is agreed as follows:

1. The
(“Public Agency”), its elected officials, officers, attorneys, agents, employees, and volunteers are additional insureds (the above named additional insureds are hereafter referred to as the “Additional Insureds”) under the Policy in relation to those activities described generally above with regard to operations performed by or on behalf of the Named Insured. The Additional Insureds have no liability for the payment of any premiums or assessments under the Policy.

2. The insurance coverages afforded the Additional Insureds under the Policy shall be primary insurance, and no other insurance maintained by the Additional Insureds shall be called upon to contribute with the insurance coverages provided by the Policy.

3. Each insurance coverage under the Policy shall apply separately to each Additional Insured against whom claim is made or suit is brought, except with respect to the limits of the Company's liability.

4. Nothing in this contract of insurance shall be construed to preclude coverage of a claim by one insured under the policy against another insured under the policy. All such claims shall be covered as third-party claims, i.e., in the same manner as if separate policies had been issued to each insured. Nothing contained in this provision shall operate to increase or replicate the Company's limits of liability as provided under the policy.

5. The insurance afforded by the Policy for contractual liability insurance (subject to the terms, conditions and exclusions applicable to such insurance) includes liability assumed by the Named Insured under the indemnification and/or hold harmless provision(s) contained in or executed in conjunction with the written agreement(s) or permit(s) designated above, between the Named Insured and the Additional Insureds.

6. The policy to which this endorsement is attached shall not be subject to cancellation, change in coverage, reduction of limits (except as the result of the payment of claims), or non-renewal except after written notice to Public Agency, by certified mail, return receipt requested, not less than thirty (30) days prior to the effective date thereto. In the event of Company's failure to comply with this notice provision, the policy as initially drafted will continue in full force and effect until compliance with this notice requirement.

7. Company hereby waives all rights of subrogation and contribution against the Additional Insureds, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to the perils insured against in relation to those activities described generally above with regard to operations performed by or on behalf of the Named Insured regardless of any prior, concurrent, or subsequent active or passive negligence by the Additional Insureds.

Page 610 of 881 ends

01257.0006/1012751.1

8. It is hereby agreed that the laws of the State of California shall apply to and govern the validity, construction, interpretation, and enforcement of this contract of insurance.

9. This endorsement and all notices given hereunder shall be sent to Public Agency at:

City Manager
City of SOUTH EL MONTE
1415 Santa Anita Avenue
SOUTH EL MONTE, California 91733

10. Except as stated above and not in conflict with this endorsement, nothing contained herein shall be held to waive, alter or extend any of the limits, agreements, or exclusions of the policy to which this endorsement is attached.

TYPE OF COVERAGES TO WHICH POLICY PERIOD LIMITS OF

THIS ENDORSEMENT ATTACHES FROM/TO LIABILITY
□ Following Form
□ Umbrella Liability
□

11. Applicable underlying coverages:

INSURANCE COMPANY POLICY NO. AMOUNT

12. The following inclusions, exclusions, extensions or specific provisions relate to the above coverages:

13. A □ deductible or □ self-insured retention (check one) of $ applies to all coverage(s) except:
(if none, so state). The deductible is applicable □ per claim or □ per occurrence (check one).

14. This is an □ occurrence or □ claims made policy (check one).

15. This endorsement is effective on at 12:01 a.m. and forms a part of Policy Number .

Page 611 of 881 ends

01257.0006/1012751.1
(signatures on following page)
I, (print name), hereby
declare under penalty of perjury under the laws of the State of California, that I have the authority to bind the Company to this endorsement and that by my execution hereof, I do so bind the Company.

Executed , 20
Signature of Authorized Representative
(Original signature only; no facsimile signature
Telephone No.: ( ) or initialed signature accepted)

Page 612 of 881 ends

TRIP HAZARD
REPAIR PROPOSAL:

Presented to: The City Of South El Monte
August 28th, 2024
Contact: Jose Figueroa
CONTACT: RONALD DURNA
MOBILE: (909) 539-7740
CA LICENSE NUMBER: 925449
The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project. Any copying or unauthorized disclosure of this information is prohibited.

ATTACHMENT C

Page 613 of 881 ends

ENVIRONMENTAL IMPACT EXAMPLE: As a member of the U.S. Green Building Council (USGBC) we are proud of the fact that we reduce the impact to landfills and the environment as a result of our service.Removing and replacing 100 panels would result in approximately 118,500 pounds or 59 tons of concrete being removed (average panel weight of 1185 pounds) Using Precision Concrete Cutting for 100 trip hazards results in 0.3 tons of concrete removed and recycled, approximately 141 gallons of gasoline saved, and a reduction of 1.3 metric tons of Co2.

COST SAVINGS
We’ll repair your sidewalks for 70-90% less than sidewalk replacement, which means you can do more for your
community for less.

A.D.A. COMPLIANCE
Patented technology that brings sidewalks into ADA compliance CLEAN
Our patented containment system captures dust and debris to bring you the cleanest process available.

SAFE
Decrease liability on your pedestrian walkways

DETAILED REPORTING
We track our jobs with honesty and integrity. Invoices show measurements, locations and cost for each hazard.

LOW IMPACT
Efficient systems with an average removal time of 20 minutes, no sidewalk closures.

FULL SERVICE CONTRACTOR
Complete GIS integration, mapping, etc.

COMMITMENT SUMMARY

Page 614 of 881 ends

U.S. GREEN BUILDING COUNCIL
Precision Concrete Cutting (PCC) is a member of
the U.S. Green Building Council, whose mission is
to bring green building and sustainability to the
building and construction industries through LEED
Certification.

LANDFILL REDUCTION
We are proud of the fact that we reduce the impact
to landfills and the environment as a result of our
service. Removing and replacing 100 sidewalk
panels results in approximately 59 tons of concrete
going to landfills, in contrast using PCC results in .3 tons of concrete.

RECYCLING
In addition to reducing the waste going to landfills, in most areas we are able to recycle the concrete to
be used in the future as road base for future roads
and infrastructure projects.

DETAILED IMPACT OF YOUR PROJECT
• Gallons of Gasoline Saved = 86.67
•Metric Tons of Co2 Saved = .77
• Number of Acres required to sequester Co2 = .94
• Total Trees Planted (.06 metric tons of Co2 per
tree) = 12.84
• Equiv. Number of Plastic Bottles Recycled (828
grams / bottle) = 930
• Number of Cars off the Road for 1 year = .169

ENVIRONMENTAL COMMITMENT SUMMARY

Page 615 of 881 ends
Page 2 ends

THE PRECISION CONCRETE CUTTING DIFFERENCE
Our patented technology and innovative sidewalk repairs process leaves you with a beautiful, smooth surface that is ADA compliant — a result you can’t get with grinding. Plus, our method saves you money! The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project.

Any copying or unauthorized disclosure of this information is prohibited.

Page 616 of 881 ends

PRECISION CONCRETE CUTTING REPAIRS
The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project.

Any copying or unauthorized disclosure of this information is prohibited.

Page 617 of 881 ends

PRECISION CONCRETE CUTTING REPAIRS
The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project.

Any copying or unauthorized disclosure of this information is prohibited.

Page 618 of 881 ends

PRICING INFORMATION
The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project.

Any copying or unauthorized disclosure of this information is prohibited.

PRICING .625” - 2.5”

ZONE NUMBER OF

HAZARDS
“SMALL”

NUMBER OF

HAZARDS
“MEDIUM”

NUMBER OF

HAZARDS
“LARGE”
TOTAL

NUMBER OF

HAZARDS

COST OF
REPAIRS .375”
- 2.5”
UNIT PRICING $31.93 $63.86 $128.75
ZONE 1 0 149 42 191 $14,992.64
ZONE 2 0 190 55 245 $19,214.65
ZONE 3 0 213 101 314 $26,605.93
ZONE 4 0 224 91 315 $26,020.89
ZONE 5 0 84 15 99 $7,295.49
ZONE 6 0 250 75 325 $25,621.25
ZONE 7 0 82 15 94 $7,167.77
ZONE 8 0 210 66 276 $21,908.10
TOTALS 0 1,402 460 1,862 $148,756.72

Page 619 of 881 ends

CONTACT US
The information in this summary is confidential, and is to be used only by the intended recipient and Precision Concrete Cutting in evaluating the project.

Any copying or unauthorized disclosure of this information is prohibited.

PRECISION CONCRETE CUTTING
13089 PEYTON DR #C235
CHINO HILLS CA 91709
Phone: 909-539-7740
CL#925449
[email protected]
www.safesidewalks.com
Trip Hazard Removal Specialist for
Los Angeles and San Gabriel Valley

Page 620 of 881 ends

MASTER SERVICE AGREEMENT
This Master Services Agreement (AGREEMENT) made as of this date, February, 15, 2023, by and between Precision Concrete Cutting (“CONTRACTOR”) and The California Joint Powers Insurance Authority (“AUTHORITY”).

This AGREEMENT is created for the sole purpose of establishing an agreed-upon set of services and related costs in order to allow California JPIA members (“MEMBER”) access to professional sidewalk inspection and maintenance services.

Further, this AGREEMENT creates no obligation or expectation that any work will result from this agreement. The CONTRACTOR’s specific services are defined below, and are available to members on as as-needed basis; the exact terms and conditions of such services are to be arranged between CONTRACTOR and MEMBER. MEMBERS are responsible for initiating and requesting any work of CONTRACTOR.

Service Option 1

SIDEWALK ASSESSMENT SERVICES
CONTRACTOR will inspect sidewalks and provide a written inspection report in the format approved by the MEMBER (optional curbs and gutters can be included in the scope of work).

The inspection reports shall include the identification, location, and description of each problem and recommended action to be taken. The format and information required may be changed at the request of MEMBER with the agreement of both parties.

Sidewalk Assessment Fee Schedule
Cost Per
Sidewalk Mile
Total Sidewalk
Miles
Estimated Cost
per Day
Estimated
Man Days
Total Estimate
Assessment Cost
$455.00 TBD $1,000 TBD $ TBD
Sample Services and Responsibilities

1. MEMBER shall provide maps of specified areas to CONTRACTOR.

2. CONTRACTOR shall inspect public right-of-ways designated on the maps.

3. CONTRACTOR shall use current ADA standards and Member standards in determining tripping hazards. These hazards shall include, but not be limited to:
a) Differential displacement between sidewalk sections 3/8 inch or greater b) Spall surfaces, holes in surfaces, and cracks above 1 inch wide or greater c) Deteriorated joints that have an eroded condition and are 1/2 inch wide or greater

4. CONTRACTOR shall record location of damaged sections in a GPS device.

ATTACHMENT D

Page 621 of 881 ends

5. Data entered into the GPS device shall be provided in writing to the MEMBER.

6. CONTRACTOR shall provide written inspection report that shall include, but not be limited to:
a. Identification and description of each problem condition b. Physical address and location including GPS location data c. Size of the hazards in height, length, and square foot d. Probable cause of the hazard, if evident
e. Pictures of damaged areas
f. Priority for repair; high, medium, low
g. Recommended action to be taken.

7. CONTRACTOR shall report to the MEMBER the results of the inspection upon completion.

Service Option 2

SIDEWALK TRIP HAZARD REMOVAL
Hazard Class Small
3/8” to 1/2”
Medium
>1/2” to 1”
Large
>1”
Lineal Foot
per Location
Square Foot
per Location
Price per Hazard $31.00 $62.00 $125.00 5 lin. feet 25 sq. ft.

CONTRACTOR shall be paid a fee for specialized trip-hazard repair service on lifted sidewalk with a difference in vertical elevation above ¼” to 2 ½”.

The fee paid to CONTRACTOR for trip-hazard removal shall be charged on a cost per hazard category per 5 lineal feet location. A removal of a trip hazard greater than 5 lineal feet shall be charged incremental cost per 5 feet location for the hazard class as follows:

Example: A less severe hazard (3/8” to 1/2” high) that is 7 lineal feet long shall be charged 2 locations (7 lineal feet = 5 feet + 2 feet) = $31 x 2 locations = $62.00 Sample Services and Responsibilities

1. CONTRACTOR shall repair sidewalk trip hazards above ¼” and up to 2 ½” in designated work areas as determined by the MEMBER.

2. CONTRACTOR shall remove hazards completely, from one end of the raised sidewalk joint to the other, if applicable, leaving a zero point of differential between slabs.

3. CONTRACTOR shall not cause any damage to landscaping, trees, retaining walls, curbs, sprinkler heads, utility covers or other objects adjacent to sidewalks. If CONTRACTOR and/or CONTRACTOR’s equipment does cause damage to above, the MEMBER must

Page 622 of 881 ends

be notified immediately and damages must be repaired at the CONTRACTOR’s expense within 24 hours of the time the damage occurred.

4. CONTRACTOR shall completely and immediately clean up all debris after each hazard is repaired. All costs incurred for disposal of waste material shall be included in unit cost and not paid for separately.

5. CONTRACTOR shall repair each sidewalk trip hazard without damage to adjacent slab(s) or curb(s).

6. CONTRACTOR shall cut dry with dust abatement mechanism. No water-cooling is allowed, which creates slurry and contaminates storm drains or causes excessive environmental impact.

7. CONTRACTOR shall submit an itemized summary of all repaired hazards which includes:
a. The specific hazard height – both high side and low side measurement – in 8ths of an inch
b. The actual length of the repair to the nearest ½ foot c. The total width of actual repair to the nearest ½ foot d. The square feet of the effective panel from joint to nearest joint or score line e. The calculated unit for measurement shall be the square foot of the effected panel f. The physical location (address) of each repair
g. Pictures of each repair as requested
h. Itemized cost of each repaired trip hazard

8. CONTRACTOR shall submit a detailed invoice setting forth the services performed, in accordance with the formula for saw-cutting calculations. All invoices must show the cut depth, size, length, width, square feet, address, the number of locations, and the date repaired for each hazard removal.

The billing unit for invoice calculation shall be the number of locations where one (1) location is up to 5 lineal feet.

9. CONTRACTOR shall guarantee specified repair slope (1:12 or 1:8 based upon requirements outlined by the Americans with Disabilities Act) is achieved. If defined slope is not achieved, CONTRACTOR must repair to specification at no additional charge within 24 hours of discovery.

10. CONTRACTOR shall guarantee that the removed trip hazard will have a uniform appearance and texture. The finished surface shall have a co-efficient of friction of at least 0.6.

11. Method of trip-hazard removal shall entail precise saw-cutting performed with hand-held, electric-powered equipment, using a machined hub and flush-mounted, diamond-tipped blades. Must be capable of cutting at any angle and perform trip-hazard removal in hardto-reach areas, around obstacles, on narrow walkways, and next to fences and retaining walls or buildings.

Page 623 of 881 ends

12. CONTRACTOR shall make its best effort to notify residents 3 days in advance of any work and schedule the operations so as to cause a minimum of interruption, interference or disturbance to the operation of stores, businesses, office buildings, hotels, churches, etc., and allow access by pedestrians and emergency, delivery and service vehicles at all times.

Sidewalk repair equipment and all other items incidental to the work shall not be left or stored on the sidewalk or on private property while not in use.

13. CONTRACTOR shall take precautions during saw-cutting operations not to disfigure, scar, or impair the health of any tree on public or private property.

Service Option 3

SIDEWALK ASSESSMENT AND TRIP HAZARD REMOVAL
Hazard Class Small
3/8” to 1/2”
Medium
>1/2” to 1”
Large
>1”
Lineal Foot
per Location
Square Foot
per Location
Price per Hazard $37.00 $74.00 $148.00 5 lin. Feet 25 sq. ft.

See sample services and responsibilities under respective sections in Service Option 1 and Service Option 2.

Service Option 4

FIVE-YEAR MAINTENANCE PROGRAM
Hazard Class Small
3/8” to 1/2”
Medium
>1/2” to 1”
Large
>1”
Lineal Foot
per Location
Square Foot
per Location
Price per Hazard $37.00 $74.00 $148.00 5 lin. Feet 25 sq. ft.

Sample Sidewalk Survey Services and Responsibilities

1. CONTRACTOR shall perform annual, semi-annual, or quarterly sidewalk inspection as determined by the scope of services to be defined by terms mutually set between the MEMBER and CONTRACTOR.

2. CONTRACTOR shall specify problems and recommend action to be taken.

3. CONTRACTOR shall prioritize the areas and problems to be resolved.

4. CONTRACTOR shall identify repairs to be accomplished by saw cutting.

5. CONTRACTOR shall identify spall surfaces, holes in surfaces, and cracks above 1” wide or greater.

6. CONTRACTOR shall recommend areas to be demolished and replaced.

7. CONTRACTOR shall provide written inspection report that shall include, but not be limited to:
a. Identification and description of each problem condition

Page 624 of 881 ends

b. Physical address and location including GPS location data c. Size of the hazards in height, length, and square foot d. Probable cause of the hazard, if evident
e. Pictures of damaged areas
f. Priority for repair; high, medium, low
g. Recommended action to be taken.
h. CONTRACTOR shall report to the MEMBER the results of the inspection upon completion.

Sample Sidewalk Trip Hazard Removal Services and Responsibilities

1. CONTRACTOR shall make repairs and recommendations to achieve the lowest overall cost to the MEMBER.

2. CONTRACTOR shall remove the existing trip hazards by saw cutting changes in elevation between adjacent panels from above ¼ inch up to 2 ½ inches in height as specified in the scope of work defined by mutually set terms between the MEMBER and CONTRACTOR.

3. The MEMBER shall set a fixed budget “not to exceed” per month, per quarter, or per year.

4. CONTRACTOR shall provide in-depth report, audit-able for maintenance and risk management
Sample Remove/Replacement Survey Reporting Services and Responsibilities

1. CONTRACTOR shall survey and report all areas not recommended for saw cutting.

2. CONTRACTOR shall identify remove and replacement locations to maximize the repair of locations that truly need to be replaced.

3. CONTRACTOR shall provide a written report that identifies the location, length, width, and square foot measurement of the effected panels to be replaced.

4. CONTRACTOR shall provide GPS locations, maps and photographs of areas recommended for removal and replacement.

5. CONTRACTOR shall provide monthly an in-depth report, audit-able for maintenance and risk management.

Bonding Requirements
Direct cost associated with any specific bonding requirements beyond the required Contractors License Bond including the cost of Performance Bond, Payment Bond, or any other additional bonding requirements are not included in the fee schedule listed above and will be added to the cost of the project.

Page 625 of 881 ends

CPI Escalation
The fees charged by Precision Concrete Cutting which are expressed as stated dollar amounts in this schedule shall be increased annually commencing on the one-year anniversary date of the Effective Date. Any increase must include written justification such as CPI figures and is subject to approval if it exceeds the annual 3% allowable increase.

Authorization
CONTRACTOR shall inspect and report only those sidewalk conditions andtriphazards as specified in the performance in this AGREEMENT, and therefore makes no representation that other trip hazards outside the scope of work have been identified. CONTRACTOR shall not be responsible for conditions outsidethecontrol of CONTRACTOR that havechanged after completion ofthe inspections due to tree roots, water, settling, and other causes, and shall not be liable for any claims, losses, or damages arising from known or unknown trip hazards. Additionally, CONTRACTOR shall carry out authorized remediation and repair work asspecified in the performance ofthis AGREEMENT, and based on locations either identified through theirinspection process or identified separately fromthe CONTRACTOR'S inspection process. CONTRACTOR shall be responsible for removal of all trip hazardsthat have been identified and authorized through the performance ofthis AGREEMENT. CONTRACTOR shall not be responsible fortrip hazards that arise after completion of the remediation and repair work asspecified in the performance ofthis AGREEMENT due to conditions outside the control of the CONTRACTOR, such astree roots, water, settling, and other causes.

FOR AUTHORITY: FOR CONTRACTOR:

Jonathan Shull Gary Beneduci

NAME NAME
Chief Executive Officer General Manager

TITLE TITLE
________________________________ ________________________________

SIGNATURE SIGNATURE
_____________ _____________

DATE DATE
February 7, 2023 February 7, 2023

Page 626 of 881 ends

City Council Agenda Report
Agenda Item No. 9.a.

DATE: September 10, 2024
TO: Honorable Mayor and Members of the City Council
APPROVED BY: Rene Salas, City Manager
SUBMITTED BY: Masami Higa, Director of Finance
SUBJECT: CONSIDERATION AND APPROVAL OF RESOLUTION NO.
24-221, AMENDING THE FISCAL YEAR (FY) 2024-25
BUDGET
SUMMARY: On June 11, 2024, the City adopted a tentative FY 2024-25 budget subject to change when agreements are reached with its employees' labor unions. The City has reached an agreement with its employees' labor unions, and staff has prepared a proposed budget amendment.

RECOMMENDED ACTION: Staff recommends City Council adopt Resolution No. 24- 221 amending the City's FY 2024-25 budget.

FISCAL/FINANCIAL IMPACT: The fiscal impact of this proposed budget amendment to the tentative FY 2024-25 budget is a reduction in the General Fund deficit/reserve applied to $183,672, and an increase in Special Revenue Funds deficit/reserve applied to $138,389.

DISCUSSION: On June 11, 2024, the City adopted Resolution No. 24-192, a tentative FY 2024-25 budget subject to change when agreements are reached with its employees' labor unions. According to the tentative FY 2024-25 budget, the City's General Fund was going to apply reserves in the amount of $590,105, and the Special Revenue Funds were going to apply reserves in the amount of $4,549,980 for FY 2024-25.

On July 29, 2024, the City reached an agreement with its employees' labor unions by entering into Memorandum of Understandings (MOUs). Also, between June 11, 2024, and July 29, 2024, staff found a few errors in the tentative FY 2024-25 budget, and would like to correct them. Staff recommends that City Council amend the tentative FY2024- 25 budget for the MOUs and the few errors found in the FY 2024-25 tentative budget as follows:

Page 627 of 881 ends

ATTACHMENT(S):

A. PowerPoint - FY24-25 Recommended Budget Amendment_09102024 B. Resolution No. 24-221 Amending the Fiscal Year 2024-25 Budget C. Exhibit A to Resolution No. 24-221

Page 628 of 881 ends

Recommended Budget
Amendment
Fiscal Year 2024-25

CITY OF SOUTH EL MONTE
September 10, 2024
City of Achievement

Page 629 of 881 ends

On June 11, 2024, the City adopted a tentative
FY2024-25 budget subject to change.
On July 29, 2024, the City reached an agreement
with its employees’ labor unions.
Between June 11, 2024 and July 29, 2024, staff
found few errors in the tentative FY2024-25 budget
and would like to correct them.
List of recommended budget adjustments
Updated FY2024-25 Budget
Updated Five Year Forecast
2 OVERVIEW

Page 630 of 881 ends

3 RECOMMENDED BUDGET ADJUSTMENTS

Page 631 of 881 ends

4 RECOMMENDED BUDGET ADJUSTMENTS

Page 632 of 881 ends

Funds
Estimated
Fund Balance
6/30/2024
Estimated
Revenues Expenditures
Net Surplus /
(Deficit)
Estimated
Fund Balance
6/30/2025
General Fund 19,912,737 23,356,013 (23,762,446) (406,433) 19,506,304 Reserve % 100% 82%
Special
Revenues
Funds
15,286,163 24,294,421 (28,982,789) (4,688,368) 10,597,795 Total 35,198,900 47,650,434 (52,745,235) (5,094,801) 30,104,099 5 UPDATED 2024-25 BUDGET

Page 633 of 881 ends

FY 23-24 FY 24-25 FY 25-26 FY 26-27 FY 27-28 FY 28-29
Forecast Proposed Forecast Forecast Forecast Forecast
General Fund
Revenues 23,721,132 23,356,013 23,474,004 24,109,727 24,819,416 25,554,408 Expenditures 21,435,925 23,762,446 24,163,567 25,297,501 26,404,957 27,707,232 Net Surplus (Deficit)

2,285,207 (406,433) (689,563) (1,187,774) (1,585,541) (2,152,824) Fund Balance 19,912,737 19,506,304 18,816,741 17,628,967 16,043,426 13,890,601 Reserve % 93% 82% 78% 70% 61% 50%
Special Revenue Funds
Revenues 7,812,960 24,294,420 18,121,679 5,389,283 4,789,213 4,873,531 Expenditures 10,314,179 28,982,789 17,495,093 3,430,447 2,842,330 2,906,262 Net Surplus (Deficit)

(2,501,219) (4,688,369) 626,586 1,958,836 1,946,883 1,967,268 Fund Balance 15,563,906 10,875,537 11,502,123 13,460,958 15,407,841 17,375,109 6 UPDATED FIVE YEAR FORECAST