Text extracted from the city's file for reading and search. Open the original on www.southpasadenaca.gov. That file is the official record.

According to the FEMA, the purpose of mitigation planning is to identify policies and actions that can be implemented to reduce risk and future losses from disasters.

Mitigation plans form the foundation for a community’s long-term strategy to reduce disaster losses and break the cycle of disaster damage and subsequent reconstruction.

The planning process is as important as the plan itself and involves community stakeholders. The plan creates a framework for risk-based decision making to reduce damages to the community, economy and potential threat to lives.

Following the Hurricane Katrina disaster in the Gulf of Mexico in 2005, FEMA mandated that state and local governments create and formally adopt federally approved LHMPs.

These plans are designed to prompt local governments to identify possible natural and man-made disasters and to provide mitigation steps. Although some disasters may be impossible to predict and/or avoid, steps should still be taken to lessen the impacts of a disaster. Hurricane Katrina shed light on areas that required a greater depth of focus for planning and preparedness in all communities.

Analysis
State and local governments must prepare and adopt FEMA approved LHMPs in order to comply with federal requirements. Federal guidelines require LHMPs be updated and adopted by local governing authorities every five years.

LHMP adoption requires stakeholder involvement and a planning process that takes place over the course of a year. City commissions and stakeholders have reviewed the draft LHMP, provided input, and approved the current draft LHMP. Presentations were provided to the following commissions and stakeholders as follows:
• June 9, 2022 Initial Technical Advisory Committee (TAC) Meeting - The TAC’s first meeting was held in-person. This meeting focused on identifying the hazards facing the City; a discussion on how to set goals, objectives, and mitigation actions; and establishing the Public Advisory Committee (PAC). The meeting agenda packet is included in Appendix 1 of the Plan.
• August 8, 2022 Public Safety Commission – A presentation was provided to the PSC regarding emergency preparedness. The presentation provided updates on both the updating of the City’s Emergency Operations Plan (EOP) as well as the LHMP.
• September 12, 2022 Public Safety Commission – An additional update was provided to the PSC regarding the LHMP and EOP and feedback was received.

October 1, 2022 Second TAC Meeting - The second TAC meeting was held virtually via Zoom. During the meeting, the TAC reviewed the list of City facilities, identified the hazards facing the City, identified members for the PAC, and the development of goals, objectives, and mitigation actions. The meeting agenda packet is included in Appendix 1 of the Plan.
19 - 2
Draft Local Hazard Mitigation Plan
August 16, 2023

Page 3 of 4 ends

• November 14, 2022 Third TAC Meeting - The third TAC meeting was held via Zoom to review the initial draft LHMP based on information developed from the first two TAC meetings.
• February 23, 2023 Initial PAC Meeting - The first PAC meeting was held via Zoom. The meeting focused on a presentation regarding LHMPs and their purpose, the role of the PAC, a review of the hazards identified by the TAC, and the initial development of the Plan’s goals, objectives, and mitigation actions. A copy of the draft LHMP was sent to the PAC.
• April 11, 2023 Planning Commission Meeting (Public Hearing) – Prior to the meeting, the Public Hearing was noticed in the South Pasadena Review newspaper and on the City’s website. At the meeting, the Commission received a presentation on the LHMP and the associated planning process. Following the Public Hearing (In-Person & Zoom), the Commission passed a Resolution approving the LHMP and recommended it be sent it to the City Council for approval.
• May 15, 2023 Second TAC Meeting - The second PAC meeting was held via Zoom. The meeting focused on gathering feedback from public stakeholders and allied agency partners.
• May 24, 2023, a press release was posted in inviting them to view the draft LHMP on the City’s website.

Alternatives
In order to be eligible for Hazard Mitigation Grants and Disaster Assistances Grants and funding the City must comply with the update process and schedule. If the LHMP is not approved and submitted the City could be financially impacted. Therefore, no alternatives are suggested.

Fiscal Impact
During the May 4, 2022 City Council meeting, the City Council accepted a proposal from R.E. Patterson and Associates for an amount not to exceed $34,000 for the 5 year update to the City’s LHMP.

An initial payment of $7,500 was budgeted and paid to R.E. Patterson and Associates on March 30, 2023 out of the FY 2022/23 City budget, Account 101-5010-5012-8180.

Two remaining payments will be made to R.E. Patterson and Associates and have been identified in FY 2023/24 City budget, Account 101-5010-5012-8180. The first payment will be made upon City Council approval of the draft LHMP and the second payment upon approval of the LHMP by Cal OES and FEMA.

Key Performance Indicators and Strategic Plan
This item is in line with section 3(c) of the City’s adopted 2021-2026 Strategic Plan, which identifies updating the City’s LHMP and Emergency Operations Plan as required by federal and state regulations.
19 - 3
Draft Local Hazard Mitigation Plan
August 16, 2023

Page 4 of 4 ends

Commission Review and Recommendation
This item was initially presented to the PSC on April 11, 2022. Additional updates on the City’s EOP as well as the LHMP were provided during the August 8, 2022, and the September 12, 2022 meetings. The PSC provided direction to bring this item to the City Council for approval.

Public Notification
A notification of this hearing was published on August 1, 2023 in the South Pasadena Review. The public was also made aware that this item was to be considered this evening by virtue of its inclusion on the legally publicly noticed agenda, posting of the same agenda and reports on the City’s website.

In addition, on May 24, 2023, a press release was posted in local area newspapers inviting the public to view the draft LHMP on the City’s website. The draft LHMP will remain posted on the City website and a hard copy will be available at the City Clerk’s office for review and additional public comment.

Attachments:

1. Draft 2023 LHMP
19 - 4

ATTACHMENT
Draft 2023 Local Hazard Mitigation Plan
19 - 5

THIS PAGE

INTENTIONALLY

LEFT BLANK
19 - 6
City of South Pasadena
Local Hazard Mitigation Plan
2023 - 2028
1414 Mission Street
South Pasadena, CA 91030
(626) 403-7200
19 - 7
19 - 8
City of South Pasadena
Local Hazard Mitigation Plan
2023 - 2028
Prepared by
131 Loma Linda Court
Scotts Valley, CA 95066
(831) 438-3290
repattersonandassociates.com
19 - 9
This Page Intentionally Left Blank
19 - 10

INSERT A COPY OF THE BOARD RESOLUTION IN THE FINAL DOCUMENT 19 - 11
This Page Intentionally Left Blank
19 - 12
i
Table of Contents Section One - Introduction..................................................................................................... 1

1.1 Purpose of the Plan.......................................................................................................................... 1

1.2 Authority.......................................................................................................................................... 2

1.3 Plan Adoption .................................................................................................................................. 2

1.4 Plan Use ........................................................................................................................................... 2

1.5 Mitigation Priorities and Goals........................................................................................................ 3

1.6 Hazard Mitigation Planning Process................................................................................................ 4

1.7 Pubic Review Process....................................................................................................................... 6

1.8 Public Comments............................................................................................................................. 6 Section Two - Community Profile........................................................................................... 7

2.1 Physical Setting ................................................................................................................................ 7

2.2 History of South Pasadena............................................................................................................... 8

2.3 Community Profile ........................................................................................................................... 9

2.4 Infrastructure................................................................................................................................. 10

2.5 Economic Trends............................................................................................................................10

2.6 Existing Land Use ...........................................................................................................................10

2.7 Development Trends......................................................................................................................13

2.8 Future Development......................................................................................................................16 Section Three - Risk Assessment and Hazard Identification .................................................. 17

3.1 What is Risk Assessment................................................................................................................17

3.2 Risk Assessment Methodology ......................................................................................................17

3.3 Hazard Identification and Prioritization.........................................................................................17

3.3.1 Hazard Identification.................................................................................................................17

3.4 Review of Existing Plans and Technical Information .....................................................................17

3.5 Calculated Priority Risk Index and the Hazard Ranking Worksheet ..............................................19

3.4.1 Calculated Priority Risk Index Assessment................................................................................23

3.4.2 Descriptive Planning Analysis by Hazard...................................................................................25

3.6 Critical Facilities .............................................................................................................................27

3.7 Hazard Change Considerations......................................................................................................31

3.8 Climate Change Considerations.....................................................................................................31 Section Four - Hazards Affecting the City.............................................................................. 33

4.1 Earthquake.....................................................................................................................................33

4.2 Severe Storms and Localized Flooding...........................................................................................61 19 - 13
ii

4.3 Landslides and Mudflow................................................................................................................66

4.4 Wildland and Urban Fires ..............................................................................................................69

4.5 Hazardous Materials and Human-Caused Events..........................................................................75

4.6 Windstorm.....................................................................................................................................78

4.7 Drought and Water Resources.......................................................................................................82

4.8 Reservoir Failure ............................................................................................................................88

4.9 Summary of Vulnerability ..............................................................................................................91

4.9.1 Significant, Moderate, and Limited Hazards.............................................................................91

4.9.2 Planning Analysis by Facility......................................................................................................91

4.9.3 Facilities Most at Risk................................................................................................................95

4.9.4 Potential Losses.........................................................................................................................96

4.10 History of Federally Declared Disasters.........................................................................................96 Section Five - Hazard Mitigation Actions.............................................................................. 99

5.1 Hazard Mitigation Overview..........................................................................................................99

5.1.1 Hazard Mitigation Goals............................................................................................................99

5.1.2 Hazard Mitigation Prioritization................................................................................................99

5.1.3 Hazard Mitigation Benefit-Cost Review..................................................................................101

5.2 Review of Previous Mitigation Actions from the 2019 LHMP .....................................................101

5.3 Current Hazard Mitigation Actions..............................................................................................102

5.4 Planning and Regulatory Capabilities Assessment ......................................................................124

5.5 Organizational Capabilities Assessment ......................................................................................131

5.6 Implementation Through Existing Programs...............................................................................137

5.7 Incorporation Into Existing Planning Mechanisms......................................................................138 Section Six - Plan Maintenance Process.............................................................................. 139

6.1 Monitoring, Evaluating, and Updating the Plan...........................................................................139

6.2 Method and Schedule for Updating the Plan Within Five Years.................................................140

6.3 Five-Year LHMP Update Timeline ................................................................................................141

6.4 Annual Progress Report Form......................................................................................................141

6.5 Adoption ......................................................................................................................................141

6.6 Continued Public Involvement.....................................................................................................141

6.7 Point of Contact...........................................................................................................................142

6.8 LHMP Annual Progress Report Form ...........................................................................................143 Section Seven - Glossary of Acronyms................................................................................ 145 19 - 14
iii
List of Exhibits
Exhibit 1 - Map of the City of South Pasadena ............................................................................................. 7 Exhibit 2 - Location of the City in Los Angeles County.................................................................................. 7 Exhibit 3 - Land Use Map ............................................................................................................................12 Exhibit 4 - City of South Pasadena Urban Form Map..................................................................................13 Exhibit 5 - Location of City of South Pasadena Facilities ............................................................................29 Exhibit 6 - Southern California Active Fault Zones......................................................................................39 Exhibit 7 - Regional Earthquake Faults and Probabilities ...........................................................................41 Exhibit 8 - Raymond Fault Map...................................................................................................................43 Exhibit 9 - Local Liquefaction Map..............................................................................................................45 Exhibit 10 - City of South Pasadena Potential Landslide Area Map............................................................47 Exhibit 11 - USGS Earthquake Shake Map - Southern San Andreas Fault...................................................55 Exhibit 12 - USGS Earthquake Shake Map - Sierra Madre Fault ................................................................. 56 Exhibit 13 - USGS Earthquake Shake Map - Verdugo Fault.........................................................................57 Exhibit 14 - USGS Earthquake Shake Map - Eylsian Park Fault...................................................................58 Exhibit 15 - USGS Earthquake Shake Map - Raymond Fault.......................................................................59 Exhibit 16 - Map of Wildland - Urban Interface..........................................................................................70 Exhibit 17 - CalFire Fire Hazard Map...........................................................................................................74 Exhibit 18 - Southern California Terrain Map .............................................................................................78 Exhibit 19 - Map of Water Pressure Zones ................................................................................................. 83 Exhibit 20 - October 11, 2022 California Drought Monitor ........................................................................84 Exhibit 21 – July 25, 2023 California Drought Monitor...............................................................................85 List of Figures
Figure 1 - Cawston Ostrich Farm................................................................................................................... 8 Figure 2 - South Pasadena Train Station....................................................................................................... 9 Figure 3 - Photo of South Pasadena Residential District ............................................................................14 Figure 4 - Photo of Ostrich Farm.................................................................................................................14 Figure 5 - Photo of Metro “L” Line Station ................................................................................................. 15 Figure 6 - Raymond Hotel - Before, During, and After Fire.........................................................................72 Figure 7 - Devil’s Gate Dam and Reservoir..................................................................................................89 List of Tables
Table 1 - Technical Advisory Team Members............................................................................................... 4 Table 2 - Public Advisory Committee Participants........................................................................................ 4 Table 3 - Meeting Summaries and Public Involvement Opportunities......................................................... 5 Table 4 - Summary of Public Comments....................................................................................................... 6 Table 5 - Demographic, Economic, and Social Data for South Pasadena ..................................................... 9 Table 6 - Planning (Land Use) Designations................................................................................................11 Table 7 - South Pasadena Hazard Identification.........................................................................................18 19 - 15
iv
Table 8 - CPRI Hazard Ranking System........................................................................................................20 Table 9 - CPRI Risk Assessment for the City of South Pasadena................................................................. 23 Table 10 - Hazard Ranking Worksheet........................................................................................................24 Table 11 - Descriptive Planning Considerations by Hazard for the City of South Pasadena.......................25 Table 12 - South Pasadena Critical Facilities and Infrastructure ................................................................27 Table 13 - City of South Pasadena Identified Hazards and PlanningConsiderations...................................31 Table 14 - Moment Magnitude Scale for Earthquakes...............................................................................50 Table 15 - Modified Mercalli Intensity Scale for Earthquakes....................................................................51 Table 16 - Largest Southern California Earthquakes 1980 to 2022 ............................................................53 Table 17 - Most Likely Damaging Earthquake Scenarios............................................................................54 Table 18 - Historical Severe Storm / Flooding Events in Los Angeles County.............................................63 Table 19 - Regional Landslides and Mudflows............................................................................................67 Table 20 - California Wildland Fires January to September 2022...............................................................71 Table 21 - Hazardous Materials Releases in California (Partial January 2022)...........................................76 Table 22 - Damaging Wind Events from 1979 to 2014 ...............................................................................79 Table 23 - Historical Drought Events...........................................................................................................86 Table 24 - Planning Consideration Assessments by Facility........................................................................92 Table 25 - Facilities Most at Risk.................................................................................................................95 Table 26 - Costliest Critical Facilities...........................................................................................................96 Table 27 - List of Federally Declared Disasters in California from 1980 to 2022........................................96 Table 28 - STAPLE-E Review and Section Criteria .....................................................................................100 Table 29 - 2019 South Pasadena Hazard Mitigation Actions and Current Status.....................................103 Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions.........................................................110 Table 31 - City of South Pasadena Planning Capabilities Assessment......................................................124 Table 32 - Outside Agency Capabilities.....................................................................................................127 Table 33 - City of South Pasadena Department Responsibilities..............................................................131 Table 34 - City of South Pasadena Capital Improvement Program Projects FY 2022 to FY 2027.............133 Table 35 - Internal City Funding Sources ..................................................................................................137 Table 36 - Potential Outside Funding Sources..........................................................................................137 Appendices
Appendix 1 - Technical Advisory Committee Documents
Appendix 2 - Public Advisory Committee and Public Comment Documents 19 - 16
August 2023 1

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION ONE
Section One - Introduction
The City of South Pasadena offers the benefits of living in a Mediterranean type of climate. The city is characterized by the unique and attractive landscape that makes the area so popular. However, the potential impacts of natural hazards associated with the terrain make the environment and population vulnerable to natural disaster situations.

Natural hazards and extreme weather events are an ongoing part of the weather cycle and seasons.

However, when natural hazards such as earthquakes, fires, or winter storms are at their height, they pose a severe risk to people and property. They can cause death, leave people injured or displaced, cause significant damage to our communities, businesses, public infrastructure, and environment, cost tremendous amounts in response and recovery dollars, and contribute to economic loss.

Throughout history, the residents of the City of South Pasadena have dealt with the various hazards affecting the area. In the past, the area's residents dealt with earthquakes, earth movements, flooding, wildfire, and severe storms.

Although fewer people were in the area, the hazards adversely affected the lives of those who depended on the land and climate conditions for food and welfare. As the population of the city continues to increase, the exposure to hazards creates an even higher risk than previously experienced.

A successful hazard mitigation strategy enables the implementation and sustaining of local actions that reduce vulnerability and risk from hazards or the severity of the effects of hazards on people and property.

Historically, in many local jurisdictions, disasters are followed by repairs and reconstruction, restoring the area to pre-disaster conditions.

While we cannot prevent disasters from happening, their effects can be reduced or eliminated through a well-organized public education and awareness effort, preparedness activities, and mitigation actions. For those hazards which cannot be fully mitigated, the community must be prepared to provide an efficient and effective response and recovery. The City of South Pasadena has the Raymond Earthquake Fault running through it, experiences severe winter storms, and is subject to various other natural disasters.

This Hazard Mitigation Plan (Plan) outlines opportunities to increase South Pasadena's resiliency in the face of future natural hazards.

1.1 PURPOSE OF THE PLAN
As the cost of damages from natural disasters continues to increase, the City of South Pasadena understands the importance of identifying effective ways to reduce vulnerability to disasters. This Plan assists South Pasadena in reducing vulnerability to disasters by identifying critical facilities (Table 12 - South Pasadena Critical Facilities), resources, information, and strategies for risk reduction while helping to guide and coordinate mitigation actions.

The Plan provides a set of strategies intended to do the following: reduce risk from natural hazards through education and outreach programs, foster the development of partnerships, and implement risk reduction activities.
19 - 17
August 2023 2

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION ONE
The resources and information within the Plan:
• Establish a basis for coordination and collaboration among participating agencies and public entities;
• Identify and prioritize future mitigation projects; and • Assist in meeting the requirements of federal assistance programs. The South Pasadena Hazard Mitigation Plan works in conjunction with other plans, including the General Plan, the Strategic Plan, and the City’s Emergency Operations Plan.

1.2 AUTHORITY
The Disaster Mitigation Act of 2000 (DMA 2000), Section 322 (a-d) requires that local governments, as a condition of receiving federal disaster mitigation funds, have a mitigation plan that describes the process for identifying hazards, risks, and vulnerabilities, identifies and prioritizes mitigation actions, encourages the development of local mitigation and provides technical support for those efforts. This mitigation plan serves to meet these requirements. This plan was developed following the guidelines set forth in FEMA’s Local Mitigation Planning Guide (FP 206-21-002), April 19, 2023.

1.3 PLAN ADOPTION
The City of South Pasadena approved the LHMP on August 16, 2023. After the California Office of Emergency Services (CalOES) review, it was approved by FEMA on Date. The City Council adopted the Final LHMP on Date.

1.4 PLAN USE
Each section of the mitigation plan provides information and resources to assist the public in understanding the hazard-related issues facing residents, businesses, and the environment. The plan's structure enables the public to use a section of interest and allows the City to review and update sections when new data is available. The ability to update individual sections of the mitigation plan places less of a financial burden on the City. Decision-makers can allocate funding and staff resources to selected pieces needing review, avoiding a full update, which can be costly and time-consuming. In addition, incorporating new data into the plan will result in a hazard mitigation plan that remains current and relevant to the City.

The Local Hazard Mitigation Plan is comprised of the following sections:

Section One: Introduction
The Introduction describes the background and purpose of developing the mitigation plan, introducing the mitigation priorities, and summarizing the planning process.

Section Two: Community Profile
The Community Profile presents the City of South Pasadena's history, geography, demographics, and socioeconomics. It serves as a tool to provide a historical perspective of natural hazards in the city. 19 - 18
August 2023 3

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION ONE
Section Three: Risk Assessment and Hazard Identification This section provides information on hazard identification, hazard profiles, vulnerability and risk associated with natural hazards, and a vulnerability assessment of critical facilities concerning the identified hazards.

Section Four: Hazards Affecting the City
This section documents in-depth profiles of each of the hazards identified as having a potential impact on the City of South Pasadena.

Section Five: Mitigation Actions
This section provides strategies and mitigation actions to reduce potential risks to the City’s facilities.

Section Six: Plan Maintenance Process
This section provides information on plan implementation, monitoring, and evaluation of the assets and capabilities available to achieve the proposed mitigation actions outlined in Section Five and opportunities for continued public involvement.

Section Seven: Glossary of Acronyms
Listing of commonly used Acronyms in Emergency Management and Hazard Mitigation planning.

1.5 MITIGATION PRIORITIES AND GOALS
The mission of the South Pasadena Hazard Mitigation Plan is to promote sound public policy designed to protect citizens, critical facilities, infrastructure, private property, and the environment from natural hazards. This can be achieved by increasing public awareness, documenting the resources for risk reduction and loss-prevention, and identifying activities to guide the city toward building a safer, more sustainable community.

The City’s Technical Advisory Committee (TAC) has adopted the four primary goals for reducing disaster risk in the South Pasadena Hazard Mitigation Plan, which include:

1. Avoid or reduce the potential for loss of life, injury, and economic damage to South Pasadena residents from earthquakes, floods, drought, landslides, and other geological hazards.

2. Increase the ability of the city government to serve the community during and after hazard events.

3. Protect South Pasadena’s unique character, scenic beauty, and values from being compromised by hazard events.

4. Encourage mitigation activities to increase the disaster resilience of the city, institutions, private companies, and systems essential to a functioning City of South Pasadena. 19 - 19
August 2023 4

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION ONE

1.6 HAZARD MITIGATION PLANNING PROCESS
City staff responsible for developing and maintaining this plan are known as the Technical Advisory Committee (TAC). Members of this team involved in the drafting of this document starting in June 2022:

Table 1 - Technical Advisory Team Members
Name Title
Alma Medina Senior Management Analyst
Andrew Jared City Attorney
Andy Dubois Police Sergeant
Anteneh Tesfaye Deputy Director of Public Works
Cathy Billings Library Director
Eric Zanteson Fire Division Chief
Matt Chang Planning Manager
Sheila Pautsch Community Services Director
Somin Kang Accountant
Tamara Binns Assistant to the City Manager
The TAC is responsible for developing, implementing, and maintaining this plan. A Public Advisory Committee (PAC) was formed to advise the City during the development of this plan. Coordination with the PAC enables ongoing risk reduction coordination throughout the area. Table 2 lists PAC representatives from the following local agencies:

Table 2 - Public Advisory Committee Participants
Committee Participants
Name Agency E-Mail
Jeannette Soriano So Cal Edison [email protected] Hellen Romero Shaw Southern California Gas [email protected] Richard Gomez Southern California Gas [email protected] Ed Chen Athens Waste [email protected]
Loni Ezell LA County DPW [email protected]
Soraya Sutherlin Area C DMAC [email protected]
Leslie Luke LA County OEM [email protected]
Moniek Pointer Metro [email protected]
Ryan Chan American Red Cross [email protected]
Dave Lubs SPUSD [email protected]
Laurie Wheeler Chamber of Commerce [email protected] Casey Law Natural Resource & Environmental Comm. [email protected] 19 - 20
August 2023 5

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION ONE
Table 3 - Meeting Summaries and Public Involvement Opportunities Date Purpose
June 9, 2022
Initial TAC Meeting - The Technical Advisory Committee's (TAC) first meeting was held inperson. This meeting focused on identifying the hazards facing the City; a discussion on how to set goals, objectives, and mitigation actions; and establishing the Public Advisory Committee (PAC). The meeting agenda packet is included in Appendix 1.

August 8, 2022 Public Safety Commission - An update on the LHMP process was provided to the PSC by the Fire Chief at their regularly scheduled monthly meeting.

September 12,
2022
Public Safety Commission - An additional update on the LHMP was given to the PSC at their regularly scheduled monthly meeting.

October 1, 2022
Second TAC Meeting - The second TAC meeting was held virtually via Zoom. During the meeting, the TAC reviewed the list of City facilities, identified the hazards facing the City, identified members for the Public Advisory Committee (PAC), and the development of goals, objectives, and mitigation actions. The meeting agenda packet is included in Appendix 1.

November 14,
2022
Third TAC Meeting - The third TAC meeting was held via Zoom to review the initial draft LHMP based on information developed from the first two TAC meetings.

February 23,
2023
Initial PAC Meeting - The first PAC meeting was held via Zoom. The meeting focused on a presentation regarding LHMPs and their purpose, the role of the PAC, a review of the hazards identified by the TAC, and the initial development of the Plan’s goals, objectives, and mitigation actions. A copy of the draft LHMP was sent to the PAC.

April 11, 2023
Planning Commission Meeting (Public Hearing) – Prior to the meeting, the Public Hearing was noticed in the South Pasadena Outlook newspaper and on the City’s website. At the meeting, the Commission received a presentation on the LHMP and the associated planning process.

Following the Public Hearing (In-Person & Zoom), the Commission passed a Resolution approving the LHMP and recommended it be sent it to the City Council for approval.

May 17, 2023
Second PAC Meeting - The PAC met via Zoom for the second time to review the draft LHMP and make final recommendations to the City. Refer to Table 5 - Summary of Public Comments.

May 24, 2023
to
July 15, 2023
Public Outreach - Upon completion of the Draft LHMP, the City posted the document on the City’s website. A news release was also distributed to local media organizations regarding the posting on the website and asking for public review and comment. Refer to Table 5 - Summary of Public Comments.

August 16, 2023
City Council Meeting (Public Hearing) - The Public Hearing was noticed on the City’s website.

The Council opened a Public Hearing, and staff presented the Local Hazard Mitigation Plan to the Council for approval. The City Council approved the submittal of the LHMP to CalOES and FEMA.

Date Final Board Meeting to Approve the LHMP -
19 - 21
August 2023 6

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION ONE

1.7 PUBIC REVIEW PROCESS
Two PAC meetings were held where the LHMP was reviewed and discussed. The LHMP process was also presented to the City’s Public Safety Commission, which is made up of local citizens, at two of their monthly scheduled meetings. Comments from these meetings are included in Table 4.

The City of South Pasadena’s Planning Commission held a Public Hearing on April 11, 2023. The Commission allowed public comment at the meeting and recommended it be placed for additional community review.

On May 24, 2023, the City of South Pasadena’s Draft Local Hazard Mitigation Plan was made available to the public via the City’s website; it was sent out to interested stakeholders, and a hard copy was made available at City Hall, the Police Department, and the Fire Department’s front desks for a 30-day public review. The City Council conducted a second Public Hearing on August 16, 2023. After approving the Plan, they recommended that it be forwarded for review to CalOES and FEMA.

1.8 PUBLIC COMMENTS
Table 4 lists the comments received during the public review process.

Table 4 - Summary of Public Comments
Initial PAC Meeting
Commenter Comments
Soraya Sutherlin Question about adding Evacuation Planning to the LHMP Casey Law Questions regarding LHMP and operational issues Public Safety Commission Meetings
Commenter Comments
None No comments on the plan were made
Second PAC Meeting
Commenter Comments
None No comments on the Plan were made
City’s Website Publication
Commenter Comments
None No comments on the Plan were made
City Council Public Hearing
Commenter Comments
Name Comment
Name Comment
19 - 22
August 2023 7

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION TWO
Section Two - Community Profile

2.1 PHYSICAL SETTING
South Pasadena is located on the westernmost edge of the San Gabriel Valley. The City boundaries are generally defined by natural landmarks, including the Arroyo Seco watershed on the west, Raymond Hill on the north which divides the City from the City of Pasadena, and the Monterey Hills which straddles South Pasadena’s southwest border with the City of Los Angeles. The cities of San Marino and Alhambra are located to the east and southeast.

Exhibit 1 - Map of the City of South Pasadena
Source: Los Angeles Times, Mapping L.A.

Exhibit 2 - Location of the City in Los Angeles County
Source: Los Angeles Times, Mapping L.A.
19 - 23
August 2023 8

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION TWO

2.2 HISTORY OF SOUTH PASADENA
In early 1874, the area that is now South Pasadena was a part of the San Gabriel-Orange Grove Association. In 1875, the stockholders of the association voted to name their town Pasadena, and just three years later, residents living in the southern portion of Pasadena considered themselves South Pasadenans.

In February of 1888, South Pasadenans voted eighty-five to twenty-five for incorporation to control their territory. A board of trustees was elected, and Ammon B. Cobb was appointed as the first marshal, with Marshal B. Selmen as his deputy.

On March 2, 1888, South Pasadena officially incorporated with a population of slightly over 500. The City’s boundaries established in 1889 are essentially the same today. South Pasadena consists of 3.44 square miles of prime residential property. In 1876, unimproved land with water sold from $75 to $150 an acre. Today a vacant lot in South Pasadena can be sold for more than $200,000.

Figure 1 - Cawston Ostrich Farm
Source: City of South Pasadena, Citywide Historic Context Statement, December 16, 2014 Few cities in California are better recognized for the quality of their small-town atmosphere and rich legacy of intact late 19th and early 20th-century neighborhoods and residences. South Pasadena also firmly claims to have the San Gabriel Valley's oldest and most historic sites. For many centuries, its adjacency to a natural fording place along the Arroyo Seco had served as a gateway to travel and commerce for aboriginal peoples here and along the coast. It was here that Hahamognas greeted Portola and the missionaries who later established the San Gabriel Mission a few miles to the east.

The initial buildings on the Rancho San Pascual, which subsequently gave birth to the Cities of Pasadena, South Pasadena, and Altadena, were built here. The first of these adobe structures became headquarters for General Flores and his staff in 1847, when they agreed to surrender to American forces, ending Mexican Colonial rule in California.

In 1888, South Pasadena incorporated the southern portion of the Indiana Colony and extended south and westward to the Los Angeles border, becoming the sixth municipality in Los Angeles County. With the establishment of the Raymond Hotel and the Cawston Ostrich Farm, the small community was able to attract tourists and increasingly large waves of new residents to the Pasadena area in the late 19th and early 20th Centuries.
19 - 24
August 2023 9

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION TWO
With the completion of the Pacific Electric Short Line, putting the entire city within easy walking distance of the “red car” stations, South Pasadena also became one of the first suburbs of Los Angeles. It is now certainly one of the best-preserved cities, maintaining a small-town quality and humanity in the scale of its buildings, its residential streetscapes, and its historic commercial core.

Figure 2 - South Pasadena Train Station
Source: City of South Pasadena, Citywide Historic Context Statement, December 16, 2014

2.3 COMMUNITY PROFILE
The City of South Pasadena has a population of approximately 25,478 residents (2020 U.S. Census estimate) within an area of 3.42 square miles. Table 5 - Demographic, Economic, and Social Date for South Pasadena provides an overview of the city’s population data, ethnicity, and education levels based on the 2020 5-Year estimates.

Table 5 - Demographic, Economic, and Social Data for South Pasadena Population
Total Population 25,478
Males 12,739 (50%)
Females 12,739 (50%)
Median Resident Age 39.5
Median Household Income $ 109,927
Per Capita Income $ 64,960
Median House Value $ 1,113,100
Ethnicity
White (non-Hispanic) 40%
Black 4%
American Indian 0%
Asian 32%
Some Other Race 0%
Two or More Races 5%
Hispanic or Latino 19%
Education Attainment
High school graduate or higher 97.2%
Bachelor's degree or higher 70.6%
Source: https://censusreporter.org/profiles/16000US0673220-south-pasadena-ca/ 19 - 25
August 2023 10

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION TWO

2.4 INFRASTRUCTURE
The City’s existing infrastructure includes a variety of elements, including water, wastewater, and solid waste, that are central to the residents’ daily lives. The City wants to ensure these systems continue to operate past their intended life span and are adequate to meet the needs of a growing city. Most growth would be expected to occur in the Downtown area along Mission Street and Fair Oaks Avenue. The new development stimulated by a revised Downtown Specific Plan could be expected to exert minimal pressure on existing municipal water, sewer, power, gas, telecom, and street systems since the anticipated new development is relatively modest over a protracted period of time. A small growth increment focusing on office and mixed-use development is projected at the Ostrich Farm. Small neighborhood-scale infill development could revitalize the three centers along Huntington Drive at Fair Oaks Avenue/Freemont Avenue, and also at Fletcher Avenue and Garfield Avenue. The General Plan conservatively projects that the infill and redevelopment of these corridors and centers will largely mirror current land uses with some intensifying residential water use.

2.5 ECONOMIC TRENDS
According to the City’s most recent Comprehensive Annual Financial Report (CAFR), General Fund revenues total approximately $26.5 million, of which nearly $20 million are attributable to tax revenues, which is generally in line with other similarly sized Southern California cities. Over half of the City’s tax revenues currently come from property taxes, which total $10.1 million. Due to Proposition 13, property tax growth in California cities is limited to two percent each year, and assessed values only change when a property is sold, or there is new construction on that given property. The next largest revenue source is the City’s utility tax, totaling $3.4 million and accounting for 17 percent of all tax revenues.

However, according to the City, utility tax revenues have declined since 2010 due to water and energy conservation efforts, decreasing demand for landline telephone services, and using alternative energy sources. Motor Vehicle in Lieu Fees (MVLF) are the third largest revenue source, totaling $2.5 million and representing 13 percent of the City’s tax revenues. MVLF has generally increased with the City’s overall General Fund revenues. Sales taxes are the fourth largest revenue source, accounting for $2.4 million and 12 percent of the City’s tax revenues. Notably, sales tax revenues have increased at an annual rate of six and a half percent since 2010, which is the highest growth rate among the City’s largest revenue sources over that timeframe.

The City is currently committed to funding a number of capital projects and has an estimated backlog of $60 million in city-wide infrastructure repairs. In addition, like most California municipalities, City pension obligations will continue to expand, further burdening the City’s fiscal capacity. These commitments limit the City’s capacity to fund any other major capital improvements in the near future.

2.6 EXISTING LAND USE
South Pasadena is a collection of highly desirable historic residential neighborhoods with many tree-lined streets. The community is diverse, with a rich mix of age, income, and race. The housing stock is evenly divided between multi-family and single-family residences. The majority of residents are renters who 19 - 26
August 2023 11

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION TWO
tend to live in multi-family units.

Mission Street is the heart of the community, with a number of historic buildings, retail spaces, and cultural institutions within a walkable environment. The Metro L Line Station has sparked renewed interest in for-sale and rental housing in the downtown area. Growth opportunities tend to be limited as the City is built-out and strongly advocates for historic preservation.

Table 6 - Planning (Land Use) Designations
Very Low (0-3.9 units/acre): This designation permits detached single-family homes and is characterized by lots over 10,000 square feet.

Low (4-5.9 units/acre): This designation permits detached single-family homes and is characterized by 5,000 to 10,000 square feet.

Medium (6-13.9 units/acre): This designation permits attached housing types, such as townhomes and duplexes and detached single-family homes on smaller lots.

High (14-24 units/acre): This designation permits multi-family residential development. It is intended to identify and conserve existing concentrations of such development in the city. These areas are characterized by multi-story apartments and condominiums.

Mixed Use: Encourages a wide range of building types depending on neighborhood characteristics that house a mix of functions, including commercial, entertainment, office, and housing with a maximum density of 70 units per acre. An intensity of 2.0FAR is permitted throughout the City. .

The Downtown Specific Plan: Sees the Downtown as being shaped by two distinct corridors: Mission Street and Fair Oaks Avenue, that are adjacent and complimentary to one another. Both corridors have a clear historic center with commercial and retail uses surrounded by single and multi- family neighborhood fabric. The Mission Street corridor is centered on the light rail station. The Fair Oaks Avenue Corridor is centered on the Fair Oaks Avenue and Mission Street intersection. A maximum density of 70 units per acre is allowed.

Civic: Accommodates civic functions such as government offices, libraries, schools, community center, and places of religious worship.

Parks & Open Space: Includes active and passive public parks of all sizes to maintain open space areas for public recreation and leisure resources. These zones can range from small pocket parks to larger community parks and may include playgrounds or other recreation facilities.

Conservation: Intended to preserve the natural characteristics of properties that have been acquired by the City, while providing the public opportunities for recreation and passive enjoyment. Maintain as Open Space.

Conservation: Intended to preserve the natural characteristics of properties that have been acquired by the City, while providing the public opportunities for recreation and passive enjoyment. Maintain as Open Space.

Source: City of South Pasadena General Plan
19 - 27
August 2023 12

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION TWO
Exhibit 3 - Land Use Map
Source: City of South Pasadena
19 - 28
August 2023 13

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION TWO

2.7 DEVELOPMENT TRENDS
The culmination of separate land use designations evolves into the geography of places that address the “form and character” of that place. The City’s General Plan guides the type of intended changes in different areas. The established areas are preserved and maintained, and areas with redevelopment opportunities are programmed for investment. The General Plan redirects growth to corridors in the Downtown area, Ostrich Farm District, and neighborhood centers along Huntington Drive in varying designs based on the existing infrastructure. This approach focuses on policies, regulations, and strategies to implement the community vision for specific areas. The City’s General Plan Housing Element provides policies to accommodate the 2,067 housing units the City must plan for to achieve the City’s Regional Housing Needs Allocation (RHNA) obligation. It is anticipated these RHNA units can be feasibly built in the areas contemplated by the proposed General Plan to accommodate such growth.

The primary urban forms include organizing place types, neighborhood centers, districts, and corridors.

Listed in the following pages are place types recommended for moderate infill, redevelopment, or infrastructure improvements. Most of the new growth will be directed to Downtown and Ostrich Farm District corridors. The change to the urban form ranges from reinvestment in existing buildings and minor improvements to utility infrastructure and the public realm to the infill development that completes the prevalent development pattern. In some instances, adding new streets may be necessary to break the large-scale superblocks into pedestrian-oriented blocks or complete a block with otherwise missing buildings, open space, or infrastructure.

Exhibit 4 - City of South Pasadena Urban Form Map
19 - 29
August 2023 14

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION TWO
Development Trends - Districts: Districts consist of streets or areas emphasizing specific types of activities and exhibiting distinct characteristics. A neighborhood or parts of neighborhoods can form a district.

Figure 3 - Photo of South Pasadena Residential District

Source: City of South Pasadena General Plan
Figure 4 - Photo of Ostrich Farm

Source: City of South Pasadena General Plan
Residential Districts: South Pasadena has an impressive collection of neighborhoods representing significant periods of the City’s growth, along with important individual examples of period architectural styles and works by prominent local architects. The striking and well-preserved architecture and tree-lined streets make these neighborhoods among the most desirable places to live in Southern California. The neighborhoods are comprised of single-family districts throughout the City, with multi-family districts located along the City’s main corridors. This Plan calls for the preservation of the built and natural assets within the residential districts. While no growth other than Accessory Dwelling Units (ADUs) is projected within the stable residential districts, the City will need to plan for the 2,067 housing units required by its RHNA obligation. This may require focused rezoning of certain neighborhoods near the L Line station and high-quality transit corridors (Fair Oaks Avenue and Huntington Drive).

19 - 30
August 2023 15

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION TWO

Figure 5 - Photo of Metro “L” Line Station
Source: City of South Pasadena General Plan
The Ostrich Farm is the western gateway to the City. Once the home of Cawston’s Ostrich Farm, a provider of ostrich feathers and tourist attraction from 1896 to1935, the site was later developed as a group of creative office suites buildings and live/work lofts. Creative Office Suites in the Ostrich Farm area are typically occupied by tenants who require large floor areas such as entertainment and design firms. Creative Office Suites are fullyequipped spaces that rent out various office spaces that range from shared spaces to large private offices and are desirable to boutique businesses, design firms, and small entertainment companies. The market study shows low vacancy and high demand for 185,000 to 370,000 square feet of creative office space over the next two decades.

The vacant and underutilized parcels at Ostrich Farm represents South Pasadena’s greatest opportunity for creative office suite development, for significant amounts of new housing, or both. Creative office development could also support and enhance South Pasadena’s creative community. For sites adjacent to residential neighborhoods, mixed-use development with limited neighborhood-serving retail and transitional residential use may be appropriate. Better linkage to the Metro Gold Line Station would provide Ostrich Farm employees access to reliable transit. A Citywide public or private circulator shuttle service as part of a transportation demand management could link Ostrich Farm to downtown assets and the Metro “L” Line Station.

The “L” Line South Pasadena Station at Mission Street and Meridian Avenue is an existing mobility asset that could be better leveraged within the “walkshed” which includes a half-mile radius from the station. There are a number of locations within a half-mile of the station – within its walkshed, which includes much of Downtown South Pasadena – where “first/last mile” access to the station and transportation conditions more generally could be improved. This would serve to improve the accessibility of the station and increase transit ridership; it would also improve safety and mobility for non-users of the station who are traveling through the area. 19 - 31
August 2023 16

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION TWO

2.8 FUTURE DEVELOPMENT
While there is relatively strong demand for residential, office, and retail uses within South Pasadena, the actual amount and scale of development that can occur is limited by the amount of available land, financial feasibility of new development, fiscal priorities, and the level of acceptable density aligned with community character and vision. For residential uses, the scale and character of new development based on available opportunities differs by area. Whereas smaller mixed-use infill development is appropriate for Mission Street, Fair Oaks Avenue and Huntington Drive can accommodate larger buildings by redeveloping suburban retail centers and large surface parking lots.

In general, new residential development, particularly multifamily, is essential to bolster the City’s tax base, supporting new and existing retail by providing customers, promoting an active urban character, and can potentially help to mitigate traffic impact by locating new development near transit. The City’s RHNA obligation requires planning for 2,067 additional housing units by October 2029. The City intends to direct this growth into the Downtown area near the L Line station, and in other areas of the city like the Ostrich Farm District, Fair Oaks Avenue, and Huntington Drive, where such growth is appropriate. Office uses will likely involve new development and the adaptive reuse of underutilized buildings and spaces. However, office development's financial feasibility will require creative parking and design approaches. As with encouraging residential growth, increasing employment in the City bolsters local restaurants and retail by providing a more significant customer base and particularly generates daytime shopping and dining activity.

Finally, as the City’s sales tax revenues are an increasingly important revenue source, enhancing the retail tax base is key to fiscal sustainability. Historically, retail growth in the City has been “organic” and has occurred without a concerted effort to attract and grow particular retail businesses. However, a targeted retail strategy that focuses on creating a specialty shopping and dining destination can fully leverage the distinct market opportunity to form a retail cluster focused on “high-design” and local “flavor.” Ultimately, this will likely involve a mix of small, independent, national credit retailers that provide a holistic array of products and services to the local market and help ensure fiscal stability. Additionally, the growth of office and residential uses will be vital to increasing the daytime population, which is key to supporting a robust retail environment.

Overall, achieving a balanced mix of uses will best position the City to achieve urban vitality and fiscal sustainability. Locating employment, residents, and shopping and dining opportunities in close proximity will synergistically affect each other, promoting economic dynamism and walkability. However, as residential uses command a premium compared to retail and office uses in the City, including residential uses in new development may be integral to making mixed-use developments financially feasible.

In addition, the City’s General Plan update reflects that any new development in other areas of the city will require additional mitigation efforts, such as requiring fire-resistant building materials for all structures in hillside areas, encouraging the use of fire-resistant landscaping, requiring home sprinklers, ensuring the protection of residents from geologic and groundwater hazards, requiring a full site-specific geologic study of any hillside site within the purview of the hillside ordinance where site-specific questions such as slope stability, erosion, subsidence, and groundwater runoff. 19 - 32
August 2023 17

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE
Section Three - Risk Assessment and Hazard Identification

3.1 WHAT IS RISK ASSESSMENT
Conducting a risk assessment can provide information regarding the location of hazards, the value of existing land and property in hazard locations, and an analysis of risks to life, property, and the environment that may result from natural, technological, and human-caused hazard events. Specifically, the four levels of a risk assessment are:
• Hazard Identification
• Profiling Hazard Events
• Vulnerability Assessment/Inventory of Existing Assets • Risk Analysis

3.2 RISK ASSESSMENT METHODOLOGY
Each hazard profile was determined by the methodology described in the section above. In addition, replacement and contents values for the facilities within the hazard areas are tallied in each vulnerability table to estimate the potential losses to each hazard. It should be noted that the actual losses will depend on the type and extent of the hazard event.

3.3 HAZARD IDENTIFICATION AND PRIORITIZATION

3.3.1 HAZARD IDENTIFICATION
Using the previous South Pasadena Local Hazard Mitigation Plan (2019) and the FEMA hazard mitigation planning guidance as a reference, the Technical Advisory Committee discussed a comprehensive list of natural hazards during the meeting on June 8, 2022. This discussion resulted in the identification of the hazards which pose a potential risk to the City of South Pasadena. Table 7: 2023 City of South Pasadena Hazard Identification summarizes the TAC’s discussion for each of the natural hazards and shows which were identified, as highlighted, for inclusion in the Plan.

3.4 REVIEW OF EXISTING PLANS AND TECHNICAL INFORMATION
TAC members reviewed the General Plan, land use documents, hillside planning requirements, wildfire related plans, and City operational plans to assist in the determination of risk. These specific documents are highlighted in Section 5.7.
19 - 33
August 2023 18

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE
Table 7 - South Pasadena Hazard Identification
List of Hazards Identified in 2019
LHMP
Included in
2023 LHMP Discussion Summary
Aircraft Accident No No
Agricultural Pests No No
Avalanche No No
Climate Change N/A N/A Climate change will be considered a factor for all the identified hazards.

Coastal Erosion No No
Coastal Storm No No
Dam Failure No No
Drought and Water
Resource Yes Yes
Earthquake Yes Yes
Erosion No No
Expansive soils No No
Extreme Temperature No No
Flooding No No
Geological Hazards N/A N/A This category is included in other hazard profiles.

Hailstorms No No
Hazardous Materials
and Human Caused Yes Yes
Hurricane No No
Land Subsidence No No
Lightning No No
Landslide and Mudflow Yes Yes
19 - 34
August 2023 19

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE
Table 7 - South Pasadena Hazard Identification (Continued) List of Hazards Identified in 2019
LHMP
Included in
2023 LHMP Discussion Summary
Human-Caused Hazards N/A N/A Except for Hazardous Materials Spills, this plan intends to focus on natural hazard risk.

Reservoir Failure Yes Yes
Sea Level Rise No No
Severe Storms and
Localized Flooding Yes Yes
Storm Surge No No
Subsidence No No
Tornado No No
Tsunami No No
Volcano No No
Wildland and
Urban Fires Yes Yes
Windstorm Yes Yes

3.5 CALCULATED PRIORITY RISK INDEX AND THE HAZARD RANKING WORKSHEET This Plan used two methods for determining the Hazard and Risk Analysis for the City. The first used is the Calculated Priority Risk Index (CPRI), a FEMA-recommended ranking method that allows for the comparison of disparate hazard categories. The second is the Hazard Ranking Worksheet that was used in the previous LHMP from 2019. This worksheet calculates risk differently, giving definitive rankings as Limited, Moderate, and High. The CPRI produces the results numerically. The CPRI is obtained by assigning values to risk categories:
• Probability (45%)
• Magnitude/Severity (30%)
• Warning Time (15%)
• Duration (10%)
There are four varying degrees of risk for each of the risk categories from which to choose: 1, 2, 3, or 4.

Zero (0) is the value used when an option is not assigned. Refer to Table 8. 19 - 35
August 2023 20

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE
Table 8 - CPRI Hazard Ranking System
CPRI
Category
Degree of Risk Assigned
Weighting
Factor
Probability
Unlikely
Extremely rare, with no documented history of
occurrences or events.

Annual probability of less than 1 in 1,000 years (<0.1%). 1 45%
Possible
Rare occurrences.

Annual probability of between 1 in 100 years and 1 in
1,000 years
(0.1%-1%).
2 Likely
Occasional occurrences with at least two or more
documented historic events.

Annual probability of between 1 in 10 years and 1 in 100 years (1%-10%).
3 Highly Likely
Frequent events with a well-documented history of
occurrence.Annual probability of greater than one
every year (>10%).
4 Magnitude
Or
Severity
Negligible
Negligible property damages (less than 5% of critical
and non- critical facilities and infrastructure).

Injuries or illnesses are treatable with first aid and
there are no deaths.

Negligible loss of quality of life.

Shutdown of critical public facilities for less than 24 hours. 1 30%
Limited
Slight property damage (greater than 5% and less
than 25% of critical and non-critical facilities and
infrastructure).

Injuries or illnesses do not result in permanent disability, and no deaths exist.

Moderate loss of quality of life.

Shutdown of critical public facilities for more than one day and lessthan one week.
2 Critical
Moderate property damage (greater than 25% and less
than 50% ofcritical and non-critical facilities and
infrastructure).

Injuries or illnesses result in permanent disability and at least one death.

Shutdown of critical public facilities for more than one week and lessthan one month.
3 Catastrophic
Severe property damage (greater than 50% of critical
and non- critical facilities and infrastructure).

Injuries and illnesses result in permanent disability
and multiple deaths.

Shutdown of critical public facilities for more than one month.
4 19 - 36
August 2023 21

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE
Table 8 - CPRI Hazard Ranking System (Continued)
CPRI
Category Degree of Risk
Assigned
Weighting
Factor
Warning
Time
More than 24
hours Population will receive greater than 24 hours of warning. 1 15%
12 - 24 hours Population will receive 12 - 24 hours of warning. 2 6 - 12 hours Population will receive 6 - 12 hours of warning. 3 Less than 6
hours Population will receive less than 6 hours of warning. 4 Duration
Less than 6
hours Disaster event will last less than 6 hours. 1
10%
Less than 24
hours Disaster event will last 6 - 24 hours. 2
Less than one
week Disaster event will last between 24 hours and one week. 3 More than one
week Disaster event will last more than one week. 4
Refer to Table 10 for the City of South Pasadena results based on the CPRI Hazard Ranking System. 19 - 37
August 2023 22

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE
This Page Intentionally Left Blank
19 - 38
August 2023 23

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE

3.4.1 CALCULATED PRIORITY RISK INDEX ASSESSMENT
Table 9 - CPRI Risk Assessment for the City of South Pasadena Hazard Probability Magnitude Warning Time Duration Weighted Total
Score Weight Score Weight Score Weight Score Weight
Earthquake 3 1.35 3 0.9 4 0.6 4 0.4 3.25
Severe Storms and Localized Flooding 4 1.9 2 0.6 1 0.15 2 0.2 2.75 Landslide and Mudflow 2 0.9 2 0.6 4 0.6 3 0.3 2.4
Wildland and Urban Fire 3 1.35 3 0.9 4 0.6 2 0.2 3.05
Hazardous Materials & Human Caused 1 0.45 2 0.6 4 0.6 2 0.2 1.85 Windstorm 3 1.35 3 0.9 1 0.15 2 0.2 2.6
Drought and Water Resource 3 1.35 2 0.9 1 0.15 5 0.5 2.9 Reservoir Failure 1 0.45 4 1.2 3 0.45 4 0.4 2.4
As noted, the other tool used in ranking risk is the Hazard Ranking Worksheet, noted in Table 10. It was also used to give an overall analysis of the City of South Pasadena. These results are noted in Table 11, Descriptive Planning Analysis by Hazard.

It should be noted that both ranking tools showed almost identical hazard rating levels for the city. 19 - 39
August 2023 24

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE
Table 10 - Hazard Ranking Worksheet
Probability Importance 2.0 Secondary Impacts Importance 0.5 Based on estimated likelihood of occurrence from historical data Based on estimated secondary impacts to the community at large Probability Score Impact Score
Unlikely (Less than 1% probability in next 100 years or has a recurrence interval of greater than every 100 years.) 1 Negligible - no loss of function, downtime, and/or evacuations 1 Somewhat Likely (Between 1 and 10% probability in next year or has a recurrence interval of 11 to 100 years.) 2 Limited - minimal loss of function, downtime, and/or evacuations 2 Likely (Between 10 and 100% probability in next year or has a recurrence interval of 10 years or less.) 3 Moderate - some loss of function, downtime, and/or evacuations 3 Highly Likely (Near 100% probability in next year or happens every year.) 4 High - major loss of function, downtime, and/or evacuations 4 Affected Area Importance 0.8 Total Score = Probability x Impact, where:

Based on the size of geographical area of community affected by hazard Probability = (Probability Score x Importance) Affected Area Score Impact = (Affected Area + Primary Impact + Secondary Impacts), where:

Isolated 1 Affected Area = Affected Area Score x Importance Small 2 Primary Impact = Primary Impact Score x Importance Medium 3 Secondary Impacts = Secondary Impacts Score x Importance Large 4
Primary Impact Importance 0.7 Descriptive Hazard Planning Consideration Based on percentage of damage to the typical facility in the community Total Score (Range) Distribution Hazard Level Impact Score 0.0 12.0 1 Limited
Negligible - less than 10% damage 1 12.1 42.0 2 Moderate Limited - between 10% and 25% damage 2 42.1 64.0 3 Significant Critical - between 25% and 50% damage 3
Catastrophic - more than 50% damage 4
The probability of each hazard is determined by assigning a level, from unlikely to highly likely, based on the likelihood of occurrence from historical data. The total impact value includes each hazard's affected area, primary impact, and secondary impact levels. Each level's score is reflected in the matrix. The total score for each hazard is the probability score multiplied by its importance factor times the sum of the impact level scores multiplied by their importance factors.

Based on this total score, the hazards are separated into three categories based on the hazard level they pose to the communities: Significant, Moderate, and Limited.
19 - 40
August 2023 25

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE

3.4.2 DESCRIPTIVE PLANNING ANALYSIS BY HAZARD
Table 11 - Descriptive Planning Considerations by Hazard for the City of South Pasadena Hazard Type Probability
Impact
Total Score Descriptive Planning
Affected Area Consideration Primary
Impact
Secondary
Impacts
Earthquake 4 3.20 2.10 1.50 31.20 Moderate
Severe Storms and Localized Flooding 6 2.40 1.40 0.50 25.80 Moderate Landslide and Mudflow 2 0.08 0.07 1.00 4.00 Limited
Wildland and Urban Fire 4 2.40 2.10 1.50 24.00 Moderate Hazardous Materials & Human Caused 6 0.08 0.07 0.50 12.00 Limited Windstorm 4 3.20 2.10 1.00 25.20 Moderate
Drought and Water Resource 4 3.20 1.40 0.50 30.60 Moderate Reservoir Failure 2 0.80 1.40 0.50 5.40 Limited
For additional information on the hazard analysis for each facility, refer to 4.10.2, Planning Analysis Assessments by Facility. 19 - 41
August 2023 26

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE
This Page Intentionally Left Blank
19 - 42
August 2023 27

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE

3.6 CRITICAL FACILITIES
The Technical Advisory Committee identified 23 critical facilities for incorporation in the hazard vulnerability/risk analysis. These facilities include the Civic Center complex, the Police Department and Fire Station, and other cityowned properties and facilities that provide essential services to the community. Damage to these facilities caused by a hazard event can impair response and recovery from the event and may lead to disruption of services. This list includes critical facilities owned and operated by the City and does not include other local government, state, or federal facilities outside of city control. Refer to Table 12 below.

Table 12 - South Pasadena Critical Facilities and Infrastructure # Facility or Infrastructure Component
Estimated
Replacement
Value
Estimated
Contents
Value
Estimated
Total
Value
1 Civic Center Complex $3,915,330 $1,045,505 $4,960,835 3 Police and Fire Departments $6,884,410 $663,593 $7,548,003 3 Library & Community Room $11,305,773 $5,109,225 $16,434,998 * 4 Senior Center $1,812,686 $75,838 $21,366,476 *
5 Eddie Park $1,052,760 $65,627 $1,123,387 *
6 War Memorial $2,563,950 $30,763 $2,629,713 *
7 Recreation Center $1,791,803 $67,981 $1,861,284 *
8 Meridian Iron Works Museum $499,079 $0 $499,079
9 Garfield Park and Youth House $345,105 $6,210 $353,960 * 10 Public Works Yard $1,355,084 $249,232 $1,604,316
11 Garfield Reservoir $6,727,351 $588,610 $7,315961
12 Grand Reservoir $1,195,542 $6,181 $1,201,723
13 Westside Reservoir $5,977,293 $165,374 $6,142,668
14 Kolle Pump House $481,499 $0 $481,499
15 Indiana Booster Station $673,553 $0 $673,553
16 Bilicke Water Tower $2,267,509 $0 $2,281,178
17 Raymond Tank $2,251,877 $0 $2,251,877
* - Includes Rental Value
19 - 43
August 2023 28

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION THREE
Table 12 – City of South Pasadena Critical Facilities and Infrastructure (Continued) # Facility or Infrastructure Component
Estimated
Replacement
Value
Estimated
Contents
Value
Estimated
Total
Value
18 Wilson Reservoir (Located in the City of San Gabriel) $4,984,403 $337,902 $5,322,305 19 Mission Meridian Village Parking $15,726,015 $1,237 $15,760,252 * 20 Graves Reservoir (Located in the City of San Marino) $12,947,971 $589,705 $13,537,676 21 San Pasqual Stables $6,241,015 $51,000 $6,292,015 *
22 Arroyo Seco Golf Course $564,632 $182,736 $968,733 * 23 Arroyo Seco Racquet Club $1,558,271 $0 $1,558,271
24 Arroyo Seco Park $174,014 $0 $174,014
Total $131,886,589 $17,169,538 $150,389,869
* - Includes Rental Value
See Exhibit 5, Location of City of South Pasadena Facilities, on the following page. 19 - 44
August 2023 29

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION THREE
Exhibit 5 - Location of City of South Pasadena Facilities (Refer to Facility Number on Previous Page) Source: City of South Pasadena
21 12
17 6
11 23
9 22 7 10
1-2
8 3-4
14 15
16 5
13 19
18 20
24 19 - 45
August 2023 30

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION THREE
This Page Intentionally Left Blank
19 - 46
August 2023 31

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION THREE
Table 13 - City of South Pasadena Identified Hazards and PlanningConsiderations Identified Hazard Hazard Planning
Consideration
Earthquake Moderate
Severe Storms and Localized Flooding Moderate
Landslide and Mudflow Limited
Wildland and Urban Fire Moderate
Hazardous Materials & Human Caused Limited
Windstorm Moderate
Drought and Water Resource Moderate
Reservoir Failure Limited

3.7 HAZARD CHANGE CONSIDERATIONS
The TAC determined that there have been no significant changes to hazard prone areas City-wide since the 2019 Local Hazard Mitigation Plan was implemented. The risks associated in the previous LHMP remain the same.

3.8 CLIMATE CHANGE CONSIDERATIONS
Climate change is a serious issue, as it affects communities in various ways. In the City of South Pasadena, climate change can result in many impacts and potentially exacerbate existing natural and human-caused hazards or create new hazards. This Plan has identified climate change considerations within each hazard profile in the document to address potential climate change impacts. These considerations deal with changing weather patterns, precipitation regimes, and other hazards that these changing conditions could exacerbate. Within each hazard profile, the plan has discussed some potential impacts of climate change.

This discussion is intended to supplement, but not replace, the Probability of Future Events discussion. 19 - 47
August 2023 32

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION THREE
This Page Intentionally Left Blank
19 - 48
August 2023 33

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
Section Four - Hazards Affecting the City

4.1 Earthquake
Identifying Earthquake Hazards
An earthquake is a sudden release of energy in the earth’s crust. Caused by movement along fault lines, earthquakes vary in size and severity. The focus of an earthquake is found at the first point of movement along the fault line (which may be beneath the surface), and the epicenter is the corresponding point above the focus at the earth’s surface. Damage from an earthquake varies with the local geological conditions, the quality of construction, the energy released by the earthquake, the distance from the earthquake’s focus, and the type of faulting that generates the earthquake. Earthquake-related hazards include primary impacts (fault rupture and ground shaking) and secondary impacts (liquefaction). This hazard profile will discuss ground shaking and liquefaction since these are the most likely impacts anticipated due to an earthquake.

Ground motion/shaking is the primary cause of earthquake damage and injury. It can result in surface rupture, liquefaction, landslides, lateral spreading, differential settlement, tsunamis, and building and infrastructure failure, which could lead to fire and other collateral damage. Typically, areas underlain by thick, water-saturated, unconsolidated material will experience more significant shaking motion than areas underlain by firm bedrock, but, in some cases, topographic relief may intensify shaking along ridge tops, where landslides may develop.

Fires and structural failure are the most hazardous results of ground shaking. Most earthquake-induced fires start because of ruptured power lines, gas lines, or electrically powered stoves and equipment.

Structural failure is generally a result of age, quality, and building construction.

Liquefaction is the transformation of loose, water-saturated granular materials (such as sand and silt) from a solid to a liquid state. This results in the loss of soil strength and the soil’s ability to support weight.

Buildings and their occupants are at risk when the ground can no longer support these buildings and structures.

Earthquake-induced landslides are secondary earthquake hazards that occur from ground shaking. They can destroy the roads, buildings, utilities, and other critical facilities necessary to respond and recover from an earthquake. Many Southern California communities are highly likely to encounter such risks, especially in areas with steep slopes. Historically, hillsides in the City of South Pasadena have not experienced slope failure due to earthquakes.
19 - 49
August 2023 34

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
Location
South Pasadena is located at the boundary between two of Southern California’s geomorphic provinces in an area that is being compressed by geologic forces associated with the movement of the Pacific and North American tectonic plates. Bounded by the San Andreas Fault system on the north and the Sierra Madre fault zone on the south, the mountains are essentially a large block of the Earth’s crust that has been squeezed up and thrust over the valley floor by north-south compression along the San Andreas tectonic plate boundary. Displacements on faults at the northern edge of the Los Angeles Basin and the San Gabriel Valley are mainly of the thrust or thrust-oblique type, causing older geologic units to be pushed up along a series of faults that dip northward beneath the mountains they form. The most dramatic example of this in the South Pasadena area is the Sierra Madre fault zone, which has thrust ancient crystalline rocks onto and over younger sediments filling the valley.

The San Gabriel Valley is composed of alluvial fan sediments that have a range of ages coincident with the rise of the San Gabriel Mountains. Because the fans were built up naturally with sediments shed from the mountains, their composition reflects the rocks eroded by various streams. Most of South Pasadena is underlain by old alluvium consisting of unconsolidated gravel, sand, silt, and clay containing decomposed boulders of granitic rock from the mountains to the north and west that form the upland portions of the city. The upper alluvium is usually a loose to medium-dense silty sand underlain by discontinuous beds of moderately dense sand and gravelly sand.

The San Andreas Fault is the principal boundary between the Pacific and North American plates. As such, it is considered the “Master Fault” because it has frequent (geologically speaking) large earthquakes and controls the seismic hazard in southern California. The fault extends over 1,000 miles (1,600 kilometers) from near Cape Mendocino in northern California to the Salton Sea region in southern California. At its closest approach, the San Andreas Fault is approximately 21 miles (33 km) north of South Pasadena.

Significant faults, such as the San Andreas Fault, are generally divided into segments to evaluate future earthquake potential. The segments are generally defined at discontinuities along the fault that may affect the rupture length. In central and southern California, the San Andreas Fault zone is divided into five segments named, from north to south, the Cholame, Carrizo, Mojave, San Bernardino Mountains, and Coachella Valley segments (WGCEP, 1995). Each segment is assumed to have a characteristic slip rate (rate of movement averaged over time), recurrence interval (time between moderate to large earthquakes), and displacement (amount of offset during an earthquake). While this methodology has some value in predicting earthquakes, historical records and studies of prehistoric earthquakes show that more than one segment can rupture during a large quake or for ruptures to overlap into adjacent segments.

The last major earthquake on the southern portion of the San Andreas Fault was the 1857 Fort Tejon (M 8) event. This is the largest earthquake reported in California. The 1857 surface rupture broke the Cholame, Carrizo, and Mojave segments, resulting in displacements of as much as 27 feet (9 meters) along the rupture zone. Peak ground accelerations in the San Gabriel Valley area due to the 1857 earthquake are estimated to have been as high as 0.23g. These fault segments are thought to have a recurrence interval between 104 and 296 years.
19 - 50
August 2023 35

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
The Mojave segment of the San Andreas fault is 83 miles (133 km) long, extending from approximately Three Points southward to just northwest of Cajon Creek, at the southern limit of the 1857 rupture (WGCEP, 1995). Using a slip rate of 30±8 millimeters per year (mm/year) and a characteristic displacement of 4.5±1.5 meters (m), the WGCEP (1995) derived a recurrence interval of 150 years for this segment. The Mojave segment is estimated to be capable of producing a magnitude 7.1 earthquake, which could result in peak ground accelerations in the South Pasadena area of between 0.13g and 0.16g.

The WGCEP (1995) calculated that this segment has a 26 percent probability of rupturing sometime between 1994 and 2024.

The San Bernardino Mountains segment extends approximately 49 miles (78 km) from Cajon Creek to the San Gorgonio Pass. This segment is a structurally complex zone that is poorly understood and for which there are scant data on fault behavior. Using a slip rate of 24±5 mm/year and a characteristic displacement of 3.5±1.0 m, the 1995 WGCEP derived a recurrence interval on this fault of 146 years. This fault segment is estimated to produce a magnitude 7.3 earthquake, resulting in peak ground accelerations in San Gabriel between 0.11g and 0.13g. If this fault segment ruptures with the Mojave and Coachella Valley segments, higher ground motions would be expected. In 1994, the WGCEP (1995) calculated that this fault segment had a 28 percent probability of rupturing sometime in the next 30 years.

The Coachella Valley segment is about 71 miles (114 km) long and extends from San Gorgonio Pass to the Salton Sea. This segment has not produced any large surface-rupturing earthquakes in historical times (Sieh and Williams, 1990.) Paleoseismic studies suggest that the last surface-rupturing earthquake on this segment occurred around 1680. The data also suggest that during the 1680 earthquake and the one before that, in 1450, both the Coachella Valley and San Bernardino Mountain segments ruptured simultaneously. Using a slip rate of 25± 5mm/year and a characteristic displacement of 4.0 (+4,-2) m, the 1995 WGCEP derived a recurrence interval for this fault of 220 ±13 years. This segment can produce a magnitude 7.4 earthquake, resulting in peak ground accelerations in the South Pasadena area from 0.12g to 0.13 g. The WGCEP (1995) also calculated a 22 percent probability that this fault segment will generate an earthquake sometime between 1994 and 2024.

The Raymond Fault is a left-lateral, strike-slip fault about 13 miles (20 km) long that extends across the northern section of South Pasadena. Refer to Exhibit 6 – Raymond Fault Map. The fault is arcuate in shape, trending east-west in its western section and east-northeast in its eastern section. The fault produces a very obvious south-facing scarp along much of its length, which led many geologists to favor reverse slip as the predominant sense of fault motion. However, left-deflected channels, shutter ridges, sag ponds, and pressure ridges indicate that the Raymond Fault is predominantly a left-lateral strike-slip fault. This sense of motion is confirmed by the seismological record, especially the main shock and aftershock sequence to the 1988 Pasadena earthquake of local magnitude (ML) 5.0 that probably occurred on this fault (Jones et al., 1990; Hauksson and Jones, 1991). The Raymond fault appears to transfer slip southward from the Sierra Madre fault zone to other fault systems.

The Raymond Fault was recently trenched in San Marino and at the Los Angeles Arboretum in Arcadia (Weaver and Dolan, 2000), where significant data on the recent history of this fault were collected. These studies indicate that the most recent surface-rupturing earthquake on this fault occurred 1,000 to 2,000 years ago and that between three and five earthquakes occurred on this fault between 41,500 and 31,500 19 - 51
August 2023 36

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
years ago. This suggests that the fault either breaks in cluster earthquakes or several more surfacerupturing earthquakes have occurred on this fault that has not been detected in the trenches. Weaver and Dolan (2000) also indicate that the Raymond fault may rupture alone or with other nearby faults, such as the Hollywood fault. A strike-slip rate of 4 (+1, -0.5) mm/year on the Raymond fault was recently estimated from paleoseismic data (Marin et al., 2000; Dolan et al., in review). In California, each earthquake is followed by revisions and improvements in the Building Codes. The 1933 Long Beach resulted in the Field Act, affecting school construction. The 1971 Sylmar earthquake brought another set of increased structural standards. Similar re-evaluations occurred after the 1989 Loma Prieta and 1994 Northridge earthquakes. These code changes have resulted in more substantial and earthquake-resistant structures.

The Verdugo Fault is a 13-mile (21 km) long, southeast-striking fault that lies along the southern border of the Verdugo Mountains near Burbank. The fault has been interpreted as a reverse fault (Wesnousky, 1986) and a left-lateral strike-slip fault (Walls et al., 1998). Weber et al. (1980) first reported southwestfacing scarps 2 to 3 meters high in the alluvial fan deposits in the Burbank and West Glendale areas and other subsurface features indicative of faulting. Since Weber et al.’s study (1980), no additional surface data on this fault has been published. Recently, however, several investigators began reviewing the subsurface geology in this area (Tsutsumi and Yeats, 1999; Langenheim et al., 2000; Pujol et al., 2001).

Results of these studies suggest that the Verdugo fault changes in character from a reverse fault adjacent to the Pacoima Hills to a normal fault at the southwest edge of the Verdugo Mountains. Vertical separation on the fault is at least 1000 meters (Tsutsumi and Yeats, 1999).

Additional studies will be required to resolve these inconsistencies in the style of faulting. Given its location near highly populated portions of the Los Angeles metropolitan area, several investigations, including trenching of the fault, are likely to be conducted in the next few years to better define this fault’s seismic hazard. The slip rate on the Verdugo fault is poorly constrained and estimated at 0.5 mm/year (CGS, previously CDMG, 1996). The fault’s recurrence interval is unknown. The southern segment of the fault is thought to have ruptured during the Holocene; therefore, the fault is considered active (Jennings, 1994). The Verdugo fault can generate magnitude 6.0 to 6.8 earthquakes based on length. A magnitude

6.7 earthquake on this fault would generate peak ground accelerations in the San Gabriel Valley area between 0.53g and 0.64g.

The Sierra Madre Fault Zone is a north-dipping reverse fault zone approximately 47 miles (75 km) long. It extends along the southern flank of the San Gabriel Mountains from San Fernando to San Antonio Canyon, where it continues southeastward as the Cucamonga fault. The Sierra Madre fault has been divided into five segments, each with a different activity rate. The northwestern most segment of the Sierra Madre fault (the San Fernando segment) ruptured in 1971, causing the Mw 6.7 San Fernando (or Sylmar) earthquake. As a result of this earthquake, the Sierra Madre fault has been known to be active. In the 1980s, Crook and others (1987) studied the Transverse Ranges using general geologic and geomorphic mapping, coupled with a few trenching locations, and suggested that the segments of the Sierra Madre fault east of the San Fernando segment have not generated major Earthquakes in several thousands of years, and possibly as long as 11,000 years. By California’s definitions of active faulting, most of the Sierra Madre fault would therefore be classified as not active. Then, in the mid-1990s, Rubin and others (1998) trenched a section of the Sierra Madre fault in Altadena (at Loma Alta Park) and determined that this segment has ruptured at least twice in the last 15,000 years, causing magnitude 7.2 to 7.6 earthquakes. 19 - 52
August 2023 37

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
This suggests that the Los Angeles area is susceptible to infrequent but large near-field earthquakes on the Sierra Madre fault. Rubin et al.’s (1998) trenching data show that during the last earthquake, this fault trace shifted as much as 13 feet (4 meters) at the surface and that total displacement in the last two events added to more than 34 feet (10.5 meters)
Although the fault seems to slip at a rate of only about 0.6 mm/year, it can accumulate significant strain over time. The paleoseismic data obtained at the Loma Alta Park site were insufficient to estimate the recurrence interval and the age of the last surface-rupturing event on this fault segment. However, Tucker and Dolan (2001) trenched the east Sierra Madre fault at Horsethief Canyon and obtained data consistent with Rubin et al.’s (1998) findings. At Horsethief Canyon, the Sierra Madre fault last ruptured more than 8,000 years ago. Thus, using a slip rate of 0.6 mm/year and a slip per event of 5 meters, we can calculate a recurrence interval of about 8,000 years. If the last event occurred more than 8,000 years ago, it is possible that these segments of the Sierra Madre fault are near the end of their cycle and, therefore, likely to generate an earthquake in the not-too-distant future.

The Elysian Park Fault first came to light after the Whittier Narrows earthquake of October 1, 1987, occurred on a previously unknown blind thrust fault underneath the eastern part of the Los Angeles basin.

Davis et al. (1989) used oil field data to construct cross-sections showing the subsurface geology of the basin and concluded that the Whittier Narrows earthquake occurred on a thrust ramp they called the Elysian Park thrust fault. They modeled the Elysian Park as a shallow-angle, reverse-motion fault 6 to 10 miles below the ground surface generally located between the Whittier fault to the southeast and the Hollywood Fault to the west-northwest. Although blind thrusts do not extend to the Earth’s surface, they are typically expressed at the surface by a series of hills or mountains. Davis et al. (1989) indicated that the Elysian Park thrust ramp is expressed at the surface by the Santa Monica Mountains and the Elysian, Repetto, Montebello, and Puente Hills.

Davis et al. (1989) estimated a long-term slip rate on Elysian Park between 2.5 and 5.2 mm/yr. Dolan et al. (1995) used a different approach to estimate a slip rate on the Elysian Park fault of about 1.7 mm/year with a recurrence interval of about 1,475 years. Then, in 1996, Shaw and Suppe re-interpreted the subsurface geology of the Los Angeles basin, proposed a new model for the Elysian Park trend, and estimated a slip rate on the thrust ramp beneath the Elysian Park trend of 1.7±0.4 mm/yr.

More recently, Shaw and Shearer (1999) relocated the main shock and aftershocks of the 1987 Whittier Narrows earthquake and showed that the earthquake sequence occurred on an east-west trending buried thrust they called the Puente Hills thrust (rather than the northwest-trending Elysian Park thrust).

The Alquist-Priolo Earthquake Fault Zoning Act was passed in 1972 to mitigate the hazard of surface faulting to structures for human occupancy. This state law directly resulted from the 1971 San Fernando Earthquake, which was associated with extensive surface fault ruptures that damaged numerous homes, commercial buildings, and other structures. Surface rupture is the most easily avoided seismic hazard.

The Seismic Hazards Mapping Act, passed in 1990, addresses non-surface fault rupture earthquake hazards, including liquefaction and seismically induced landslides. The State Department of Conservation operates the Seismic Mapping Program for California. Extensive information is available at their website:
http://gmw.consrv.ca.gov/shmp/index.htm
19 - 53
August 2023 38

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
As discussed above, ground shaking potential can be expressed qualitatively using the Modified Mercalli Scale or quantitatively by the PHGA (peak horizontal ground acceleration). The PGHA value is calculated based on the so-called maximum credible earthquake or the seismic event considered likely to occur on an active fault affecting the city. In the City of South Pasadena, the Los Angeles segment of the Puente Hills blind thrust fault represents the controlling force for calculating the PGHA. Assuming a magnitude

6.5 earthquake on this fault, the best PGHA estimate is 0.5 g for loose soils (alluvium) and 0.55 g for bedrock. This level of ground shaking translates to an approximate Modified Mercalli Scale intensity of IX for the entire city. See Table 15: Modified Mercalli Intensity Scale for Earthquakes.

A significant earthquake produced along any of the regional fault systems has the potential to produce strong ground shaking in South Pasadena. Experience from the Whittier Narrows (1987) and Northridge (1994) earthquakes has shown that ridge-top locations in the city and near the margins of alluvial basins may be susceptible to elevated levels of ground shaking.

Seismic risks associated with both regional fault systems and the local blind thrust faults underlying the City of South Pasadena emphasize the need to ensure that all new development projects - and the retrofit of existing structures - incorporate appropriate design features to guard against widespread property damage and loss of life in the event of an earthquake.
19 - 54
August 2023 39

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
Exhibit 6 - Southern California Active Fault Zones
Source: Southern California Earthquake Center
19 - 55
August 2023 40

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
This Page Intentionally Left Blank
19 - 56
August 2023 41

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
Exhibit 7 - Regional Earthquake Faults and Probabilities Source: Southern California Earthquake Center
19 - 57
August 2023 42

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
This Page Intentionally Left Blank
19 - 58
August 2023 43

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
Exhibit 8 - Raymond Fault Map
Source: City of South Pasadena
Raymond Fault
19 - 59
August 2023 44

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
This Page Intentionally Left Blank
19 - 60
August 2023 45

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
Exhibit 9 - Local Liquefaction Map
Source: County of Los Angeles Enterprise GIS at https://egis-lacounty.hub.arcgis.com/datasets/lacounty::liquefaction-zones/explore?location=34.117611%2C-118.174063%2C14.39 19 - 61
August 2023 46

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
This Page Intentionally Left Blank
19 - 62
August 2023 47

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
Exhibit 10 - City of South Pasadena Potential Landslide Area Map Source: Los Angeles County Enterprise GIS at https://egis-lacounty.hub.arcgis.com/datasets/lacounty::landslide-zones/explore?location=34.109591%2C-118.165406%2C13.76 19 - 63
August 2023 48

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FOUR
This Page Intentionally Left Blank
19 - 64
August 2023 49

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Extent
An earthquake's size and magnitude (M) are measured in various ways. Charles Richter first developed the Richter scale in the 1930s for measuring the size of earthquakes occurring in southern California using relatively high-frequency data from nearby seismograph stations. This magnitude scale was referred to as (ML), with the L for local. This is what was to become known as the Richter magnitude eventually.

Another scale, the Moment Magnitude Scale, measures the magnitude of medium and large-sized earthquakes by characterizing the amount of energy released by the earthquake. These include body wave magnitude (Mb) and surface wave magnitude (Ms). Each is valid for a particular frequency range and type of seismic signal. In its range of validity, each is equivalent to the Richter magnitude. The magnitude is based on the earthquake's seismic moment, which is equal to the rigidity of the Earth multiplied by the average amount of slip on the fault and the size of the area that slipped. (USGS, Glossary of Terms on Earthquake Maps)
The Modified Mercalli Intensity Scale measures ground shaking intensity in terms of perception and damage and considers localized earthquake effects. This scale is shown in Table 15: Modified Mercalli Intensity Scale for Earthquakes.

The Alquist-Priolo Earthquake Fault Zoning Act was passed in 1972 to mitigate surface faulting to structures for human occupancy. This state law resulted from the 1971 San Fernando Earthquake, which was associated with extensive surface fault ruptures that damaged numerous homes, commercial buildings, and other structures. Surface rupture is the most easily avoided seismic hazard. The Seismic Hazards Mapping Act, passed in 1990, addresses non-surface fault rupture earthquake hazards, including liquefaction and seismically induced landslides.

The State Department of Conservation operates the Seismic Mapping Program for California. Extensive information is available on their website: http://gmw.consrv.ca.gov/shmp/index.htm.

The Richter Scale, developed in the 1930s, provided a valuable measure of earthquake comparison.

Another scale, the Moment Magnitude Scale, measures the magnitude of medium and large-sized earthquakes by characterizing the amount of energy released by the earthquake. The magnitude is based on the earthquake's seismic moment, which is equal to the rigidity of the Earth multiplied by the average amount of slip on the fault and the size of the area that slipped.

The Moment Magnitude Scale is now more widely used for scientific comparison since it accounts for the actual slip that generated the earthquake. Actual damage is due to the propagation of seismic or ground waves due to initial failure. The intensity of shaking is related to earthquake magnitude as it is to the condition of underlying materials. Loose materials tend to amplify ground waves, while hard rock can quickly attenuate them, causing minor damage to overlying structures. Refer to Table 14.

Another measurement tool, the Modified Mercalli Intensity (MMI) Scale, provides a practical qualitative assessment of ground shaking. The MMI Scale is a 12-point earthquake intensity scale based on local effects experienced by people, structures, and earth materials. Each succeeding step on the scale 19 - 65
August 2023 50

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
describes a progressively more significant amount of damage at a given point of observation. The MMI Scale is shown in Table 15, along with relative ground velocity and acceleration.

A major earthquake along any regional fault system can produce strong ground shaking in the San Gabriel Valley. In addition, seismic risks associated with both regional fault systems and the local blind thrust faults underlying the area emphasize the need to ensure that all new development projects - and the retrofit of existing structures - incorporate appropriate design features to guard against widespread property damage and loss of life in the event of an earthquake.

Table 14 - Moment Magnitude Scale for Earthquakes
Moment
Magnitude (Mw) Earthquake Effects
Less than 3.5 Generally not felt, but recorded.

3.5 - 5.4 Often felt, but rarely causes damage.

Under 6.0 At most slight damage to well-designed buildings. It can cause significant damage to poorly constructed buildings over small regions.

6.1 - 6.9 Can be destructive in areas up to about 100 kilometers across where people live.

7.0 - 7.9 Major earthquake. Can cause severe damage over larger areas.

Eight or greater Great earthquake. Can cause severe damage in areas several hundred kilometers across. 19 - 66
August 2023 51

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 15 - Modified Mercalli Intensity Scale for Earthquakes Intensity Shaking Description/Damage
Corresponding
Richter Scale
Magnitude
I Not Felt Not felt except by a very few under especially favorable conditions.

II Weak Felt only by a few persons at rest, especially on upper floors of buildings. <4.2 III Weak
Felt quite noticeably by persons indoors, especially on upper floors of buildings. Many people do not recognize it as an earthquake. Standing motor cars may rock slightly. Vibrations are similar to the passing of a truck. Durationestimated.

IV Light
Felt indoors by many, outdoors by few during the day. At night, some awakened. Dishes, windows, doors disturbed; walls make cracking sound. Sensation like a heavy truck striking building. Standing motor cars rockednoticeably.

V Moderate
Felt by nearly everyone; many awakened. Some dishes and windows broken. Unstable objects overturned. Pendulum clocks may stop.
<4.8
VI Strong
Felt by all, many frightened. Some heavy furniture moved; a few instances of fallen plaster. Damage slight. <5.4
VII Very Strong
Damage negligible in buildings of good design; slight to moderate in well-built ordinary structures; considerable damage in poorly built or badly designed structures;some chimneys broken.
<6.1
VIII Severe
Damage slight in specially designed structures; considerable damage in ordinary substantial buildings with partial collapse. Damage great in poorly built structures. Fall of chimneys, factory stacks, columns, monuments, and walls. Heavy furniture overturned.

IX Violent
Damage considerable in specially designed structures; well-designed frame structures thrown out of plumb. Damage great in substantial buildings, with partial collapse. Buildings shifted off foundations. <6.9
X Extreme
Some well-built wooden structures destroyed; most masonry and frame structures destroyed, including their foundations. Rail traffic disrupted due to bentrails.
<7.3
XI Extreme Few, if any, masonry structures remain standing. Bridges destroyed. Rails bent greatly. <8.1
XII Extreme Damage total. Lines ofsight and level are distorted. Objects are thrown into the air. >8.1
The California Geological Survey has identified areas most vulnerable to liquefaction. Liquefaction occurs when ground shaking causes wet granular soils to change from a solid state to a liquid state. This results in the loss of soil strength and the soil's ability to support weight. Buildings and their occupants are at risk when the ground can no longer support these buildings and structures. Southern California has many active landslide areas, and a large earthquake could trigger accelerated movement in these slide areas, in addition to jarring loose other unknown areas of landslide risk. 19 - 67
August 2023 52

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Previous Occurrences
The City of South Pasadena lies within a region with several active faults and therefore is subject to the risks and hazards associated with earthquakes. The most recent significant earthquake affecting Southern California was the January 17th, 1994, Northridge Earthquake. At 4:31 a.m., a moderate but very damaging earthquake with a magnitude of 6.7 struck the San Fernando Valley. In the following days and weeks, thousands of aftershocks occurred, causing additional damage to affected structures.

Fifty-seven people were killed, and more than 1,500 people were seriously injured. For days afterward, thousands of homes and businesses were without electricity; tens of thousands had no gas, and nearly 50,000 had little or no water. Approximately 15,000 structures were moderately to severely damaged, which left thousands of people temporarily homeless.
66,500 buildings were inspected. Nearly 4,000 were severely damaged, and over 11,000 were moderately damaged. Several collapsed bridges and overpasses created commuter havoc on the freeway system.

Extensive damage was caused by ground shaking, but earthquake-triggered liquefaction and dozens of fires also caused additional severe damage. This extreme ground motion in large portions of Los Angeles County resulted in record economic losses.

However, the earthquake occurred early in the morning on a holiday. This circumstance considerably reduced the potential effects. Many collapsed buildings were unoccupied, and most businesses were not yet open. The direct and indirect economic losses ran into tens of billions of dollars. Like many neighboring cities, the City of South Pasadena felt the jolt of the Northridge Earthquake; fortunately, the city did not experience significant property damage or loss of life.

In addition to the Northridge Earthquake, historical and geological records show that California has a long history of seismic events. As noted earlier, Southern California is probably best known for the San Andreas Fault, the 400-mile-long fault running from the Mexican border to a point offshore, west of San Francisco.

However, the San Andreas is only one of the dozens of known earthquake faults that crisscross Southern California. In addition to the other faults mentioned, some of the other known faults include the NewportInglewood, Chatsworth, Elsinore, Hollywood, Los Alamitos, and Palos Verdes faults. Beyond the known faults, a potentially large number of “blind” faults underlie the surface of Southern California.

Table 16 shows the most prominent Southern California earthquakes since 1980. 19 - 68
August 2023 53

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 16 - Largest Southern California Earthquakes 1980 to 2022 Date Name Mw MMI Deaths Injuries Loss
July 5, 2019 Ridgecrest 7.1 Mw IX 5 $5.3 B
July 4, 2019 Ridgecrest 6.4 Mw VIII 1 20 $5.3 B
March 28, 2014 La Habra 5.1 Mw VI Few $10.8 M
April 4, 2010 Baja California 7.2 Mw VII 2 - 4 100 - 233 $1.15 B July 29, 2008 Chino Hills 5.4 Mw VI 8 Limited
Dec. 22, 2003 San Simeon 6.6 Mw VIII 2 40 $250 - 300 M
Oct. 16, 1999 Hector Mine 7.1 Mw VII 4 Limited
Jan. 17, 1994 Northridge 6.7 Mw IX 57 8,700 + $13 - 40 B June 28, 1992 Big Bear 6.5 Mw VIII 63 More than 60 M
June 29, 1992 Landers 7.3 Mw IX 3 400 + $92 M
April 22, 1992 Joshua Tree 6.3 Mw VII 32 Light - Moderate July 28, 1991 Sierra Madre 5.6 Mw VII 2 100 - 107 $34 - 40 M Feb. 28, 1990 Upland 5.7 Mw VII 30 $12.7 M
Nov. 24, 1987 Elmore Ranch 6.5 Mw VIII 2 90 +
Nov. 23, 1987 Superstition Hills 6.1 Mw VIII $3 M
Oct. 1, 1987 Whittier 5.9 Mw VIII 8 200 $213 - 358 M
July 21, 1986 Chalfant Valley 6.2 Mw VI 2 $2.7 M
July 13, 1986 Oceanside 5.8 Mw VI 1 $700 K
July 8, 1986 N. Palm Springs 6.0 Mw VII 29 - 40 $4.5 - 6 M Probability of Future Events
According to the Southern California Earthquake Center (SCEC) document Putting Down Roots in California, the most comprehensive statewide analysis of earthquake probabilities determined the chance of having one or more magnitude 6.7 or larger earthquakes in California over the next 30 years is 99.7%.

The fault with the highest probability of such earthquakes is the southern San Andreas, with 59% in the next 30 years. For powerful quakes of magnitude 7.5 or greater, there is a 37% chance that one or more will occur in the next 30 years in Southern California.

To clarify the extent of future earthquake risk, a partnership between the United States Geological Survey, California Geologic Survey, and Southern California Earthquake Center was formed to provide a uniform forecast. Known as the Working Group on California Earthquake Probabilities, this group evaluated and systemized currently available historic and paleoseismic information to produce a probabilistic seismic hazards analysis to indicate the type of future earthquakes. One product of this analysis is a method of 19 - 69
August 2023 54

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
estimating the ground shaking is illustrated in Table 17 - Most Likely Damaging Earthquake Scenarios.

Refer to Shake Maps included in Exhibit 11 - USGS Earthquake Shake Map - Southern San Andreas Fault, Exhibit 12 - USGS Earthquake Shake Map - Sierra Madre Fault, Exhibit 13 - USGS Earthquake Shake Map - Verdugo Fault, and Exhibit 14 - USGS Earthquake Shake Map – Raymond Fault on the potential for damage based on Southern San Andreas, Verdugo, and Raymond Fault earthquakes as generated by the USGS.

Table 17 - Most Likely Damaging Earthquake Scenarios
Earthquake Fault 30-year Probability Potential
Magnitud
San Andreas Significant 6.8 to 8
Sierra Madre Moderate 6 to 7
Verdugo Moderate 6 to 6.8
Elysian Park Minimal 6 to 7
Raymond Minimal 6 to 7
19 - 70
August 2023 55

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Exhibit 11 - USGS Earthquake Shake Map - Southern San Andreas Fault 19 - 71
August 2023 56

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Exhibit 12 - USGS Earthquake Shake Map - Sierra Madre Fault 19 - 72
August 2023 57

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Exhibit 13 - USGS Earthquake Shake Map - Verdugo Fault
19 - 73
August 2023 58

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Exhibit 14 - USGS Earthquake Shake Map - Eylsian Park Fault 19 - 74
August 2023 59

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Exhibit 15 - USGS Earthquake Shake Map - Raymond Fault
19 - 75
August 2023 60

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Impacts
A large Earthquake would significantly impact the City of South Pasadena. The loss of human life and significant injuries remain a major consequence of an earthquake due to the potential of building collapses, roadway overpasses dropping, falling items and debris, and glass breakage.

With the potential of Landslides in the Monterey Hills area, a landslide could flatten or destroy houses resulting in added injuries or loss of life in the City. Liquefaction zones in the Arroyo and Monterey Hills areas also have the potential for building damage.

A significant Earthquake could also cause commercial and residential fires by severing internal gas lines.

In the downtown area, it may be difficult to stop the spread of the fire, and this, in turn, would lead to extensive damage.

The City’s utility system could also see major damage, with broken water and sewer lines, downed electrical lines, and ruptured gas lines. Damage such as this could create transportation delays along Fair Oaks Avenue, Huntington Drive, Mission Street, and Monterey Road. Damage to State Route 110 could result in traffic diverting onto City streets, causing further delays.

Lastly, a major earthquake would deplete City services to a point where mutual aid would need to be called in to help the City respond to and recover from such an event.

Vulnerability
This Plan has already established that South Pasadena lies within a region with several active faults and therefore is subject to the risks and hazards associated with earthquakes. Exhibit 7 - Local Earthquake Faults and Probabilities shows the geographic relationship of the city to surrounding active and potentially active faults. As mentioned earlier, the Raymond Fault has been identified as being within city limits. Any of these earthquake faults are a hazard risk to the city.

Climate Change Considerations
As climate change occurs, it is anticipated that changes to precipitation regimes and hydrological patterns will result. Since liquefaction depends on shallow subsurface water, increased groundwater levels could occur due to increased precipitation. The potential increase in shallow subsurface water conditions could expand the potential liquefiable areas within the city, increasing the risk of future damage to structures. 19 - 76
August 2023 61

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR

4.2 Severe Storms and Localized Flooding
Identifying Flooding Hazards
Flooding and severe storms present similar risks and are usually related types of hazards in South Pasadena. Severe storms can cause high winds, hill erosion, debris flows, and flooding.

Severe storms are usually generated in the Pacific Ocean. As they rise over the mountain and ridges that border the eastern boundaries of Los Angeles County, the air associated with these storms cools, resulting in large amounts of precipitation. The topography of the County provides relatively steep and well-defined watershed areas to funnel the falling rain into runoff tributaries. Periods of heavy rainfall are expected during the fall and winter months.

During a flood, excess water from rainfall overflows into storm drains and creeks. Several factors determine the severity of floods, including rainfall intensity and duration, creek and storm drain system capacity, and the infiltration rate of the ground.

A flood occurs when a storm drain or waterway receives a discharge greater than its conveyance capacity.

Floods may result from intense rainfall, localized drainage problems, or failure of flood control or water supply structures such as culverts, levees, dams, or reservoirs. Floods usually occur in relation to precipitation. Flood severity is determined by the quantity and rate at which water enters the waterway, increasing the volume and velocity of water flow. The rate of surface runoff, the major component of flood severity, is influenced by the region's topography and the extent to which ground soil allows for infiltration, in addition to the percentage of impervious surfaces.

Floodwaters can carry large objects downstream with force strong enough to destroy stationary structures such as homes and bridges and break utility lines. Floodwaters also saturate materials and the earth resulting in the instability, collapse, and destruction of structures and the loss of human life.

Two types of flooding may affect the area: riverine flooding and urban flooding (see descriptions below).

In addition, any low-lying area has the potential to flood. The flooding of developed areas may occur when the amount of water generated from rainfall and runoff exceeds a stormwater system’s capability to remove it.

Riverine flooding is the overbank flooding of rivers and streams. The natural processes of riverine flooding add sediment and nutrients to fertile floodplain areas. Flooding in large river systems typically results from large-scale weather systems that generate prolonged rainfall over a wide geographic area, causing flooding in hundreds of smaller streams that drain into the major rivers. Shallow area flooding is a particular type of riverine flooding. FEMA defines shallow flood hazards as areas that are inundated by a 100-year flood with flood depths of only one to three feet. Low-velocity sheet flows of water generally flood these areas.
19 - 77
August 2023 62

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Urban Flooding is a concern as land is converted from fields or woodlands to roads and parking lots and loses its ability to absorb rainfall. Urbanization of a watershed changes the hydrologic systems of the basin. Heavy rainfall collects and flows faster on impervious concrete and asphalt surfaces. The water moves from the clouds to the ground and into streams much fasterin urban areas. Adding these elements to the hydrological systems can result in flood waters that rise rapidly and peak with violent force.

South Pasadena has a high concentration of impervious surfaces that either collect or concentrate water flow in unnatural channels. During periods of urban flooding, streets can become swift-moving rivers, and basements can fill with water. Storm drains often back up with vegetative debris causing additional, localized flooding.

Location
Flooding occurs when climate, geology, and hydrology combine to create conditions where water flows outside its usual course. In South Pasadena, geography and climate combine to create seasonal flooding conditions, especially in the city's older sections where older storm drains can no longer carry the water generated by Severe Storms.

The greater Los Angeles Basin has been the product of rainstorms and erosion for millennia. Most of the mountains that ring the valleys and coastal plain are deeply fractured faults, and as they (the mountains) grew taller, their brittle slopes were continually eroded. Rivers and streams carried boulders, rocks, gravel, sand, and silt down these slopes to the valleys and coastal plain. In places, these sediments are as much as twenty thousand feet thick.

Many portions of Los Angeles County, including the San Gabriel Valley, are built for all intents and purposes. This leaves precious little open land to absorb rainfall. The lack of open ground forces water to remain on the surface and rapidly accumulate. Flooding would be much more common if not for the massive flood control system with its concrete-lined river and stream beds. And the tendency is towards even less and less open land. In-fill building is becoming a much more common practice in many areas.

Developers tear down an older home, which typically covers up to 40% of the lot size, and replace it with three or four townhomes or apartments that may cover 90-95% of the lot.

Another potential source of flooding is “asphalt creep.” The street space between the curbs of a street is a part of the flood control system. Water leaves the property and accumulates in the streets, where it is directed toward the underground portion of the flood control system. The carrying capacity of the street is determined by the width of the street and the height of the curbs along the street.

Extent
As part of the National Flood Insurance Program (NFIP), floodplain studies have been conducted for various communities in Los Angeles County, including the City of South Pasadena. The results of these studies are presented on Flood Insurance Rate Maps (FIRM), which identify 100 and 500-year floodplain boundaries. The City of South Pasadena is located on Panel No. 0650671 of the FIRM maps. The entire city is located within Zone C, which designates areas of minimal flooding. As there are no floodplain areas 19 - 78
August 2023 63

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
within the city, and there are no pertinent large-scale flood hazards. Because of this, the City of South Pasadena does not participate in the NFIP as it has been designated as a No Special Flood Hazard Area (NSFHA). Refer to https://www.fema.gov/cis/CA.html.

Past Occurrences
Severe storms that cause flooding have occurred numerous times over the years. In the last 125 years, the average annual rainfall in Los Angeles County has been 14.9 inches. But the term “average” means very little as the annual rainfall during this period has ranged from only 4.35 inches in 2001-2002 to 38.2 inches in 1883-1884. In fact, in only fifteen of the past 125 years, the annual rainfall has been within plus or minus 10% of the 14.9-inch average. In only 38 years, the annual rainfall has been within plus or minus 20% of the 14.9-inch average. This makes the Los Angeles basin a land of extremes in terms of annual precipitation. The City of South Pasadena is in the western region of the San Gabriel Valley. It is close to the San Gabriel Mountains, which increases rainwater collection. Refer to Table 18 - Historical Severe Store and Flooding Events in Los Angeles County
Table 18 - Historical Severe Storm / Flooding Events in Los Angeles County Year Event
1825 L.A. River changed its course back from the Ballona wetlands to San Pedro 1832 Heavy flooding
1861-62 Heavy flooding. Fifty inches of rain falls during December and January. 1867 Floods create a large, temporary lake out to Ballona Creek. 1876 The Novician Deluge
1884 Heavy flooding causes the river to change, turning east to Vernon and southward to San Pedro.
1914 Heavy flooding. Great damage to the harbor.
1934 Moderate flood starting January 1. Forty dead in La Canada. 1938 Great County-wide flood with four days of rain. Most of the rain on day 4. 1941-44 L.A. River floods five times.
1952 Moderate flooding
1969 One heavy flood after a nine-day storm. One moderate flood. 1978 Two moderate floods
1979 Los Angeles experiences severe flooding and mudslides. 1980 Flood tops banks of a river in Long Beach. Sepulveda Basin spillway almost opened. 1983 Flooding kills six people.
1992 15-year flood. Motorists trapped in Sepulveda basin. Six people dead. 1994 Heavy flooding
19 - 79
August 2023 64

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 18 - Historical Severe Storm / Flooding Events in Los Angeles County (Continued) Year Event
2005 First large flood in Los Angeles County since 1938. It centered in communities near the Los Angeles River or near creeks connected to the Los Angeles River. Three people were killed. 2009 Intense rainfall on mountain slopes denuded by the Station Fire triggered mud, rock, and boulders to flow into a hillside community in La Canada Flintridge. 2010
A series of powerful Pacific winter storms fueled by El Nino conditions pounded Los Angeles County and leashed mud and debris flows that prompted evacuations, flooded businesses, and downed trees and power lines.
2013 Heavy thunderstorms developed in the high desert. Radar estimated rainfall west of Victorville at seven inches.
2015 A severe storm swept through Southern California, causing mudslides to close portions of Interstate 5 and Hwy 58 near Mojave.
2018 Marine layer clouds brought drizzle and dense fog to the Cajon Pass, reducing visibilities on Interstate 5. A 30-vehicle crash occurred, and 21 people were injured.

Probability of Future Events
Severe storms will always continue to occur in Southern California. Anecdotal information reveals that South Pasadena experiences one large storm every two to three years. This equates to a 33% to 66% chance of a large storm occurring within the city in a given year.

Impacts
The greatest Flooding issue in South Pasadena is related to the City’s storm drain infrastructure and its inability to handle significant amounts of rainfall during Severe Storms. Water will flood the roadways and surrounding properties, causing traffic disruption and the possibility of property damage to businesses and residences. Associated property damage could lead to claims against the City and the possibility of financial losses. The City of South Pasadena is addressing this issue by updating its storm drain system over the next five years in an attempt to mitigate localized flooding Vulnerability
In general, flood hazard identification is the first phase of hazard assessment. Identification is the process of estimating: (1) the geographic extent of the floodplain (i.e., the area at risk from flooding); (2) the intensity of the flooding that can be expected in specific areas of the floodplain; and (3) the probability of occurrence of flood events. This process usually results in the creation of a floodplain map. Floodplain maps provide detailed information that can assist jurisdictions in making policies and land-use decisions.

This phase is not pertinent to the City of South Pasadena. 19 - 80
August 2023 65

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Vulnerability assessment is the second step of flood-hazard assessment. It combines the floodplain boundary, generated through hazard identification, with an inventory of the property within the floodplain. Understanding the population and property exposed to natural hazards will assist in reducing risk and preventing loss from future events. Flooding events in South Pasadena will be localized due to urban flooding issues.

Risk analysis is the third and most advanced phase of a hazard assessment. It builds upon hazard identification and vulnerability assessment. A flood risk analysis for the City of South Pasadena should include two components: (1) the life and value of a property that may incur losses from a localized flood event (defined through the vulnerability assessment); and (2) the number and type of flood events expected to occur over time. Within the broad components of risk analysis, it is possible to predict the severity of damage from a range of events.

The data used to develop these models is based on hydrological analysis of landscape features. Changes in the landscape, often associated with human development, can alter the flow velocity and the severity of damage expected from a localized flood event.

It is possible that damage can be expected from localized flood events over time. It is also possible to pinpoint the effects of certain flood events on individual properties. In the future, updated mapping projects will result in better data that will assist in understanding specific flooding risks.

Climate Change Considerations
According to the Scripps Institution of Oceanography, the last two decades underscore California’s strong propensity for wet and dry periods, with a string of multi-year droughts punctuated by a few spectacular wet years. Scripps downscaled global models indicate that, by the mid-21st century, California’s dry years may become drier, wet years occasionally becoming wetter. On top of its already volatile hydroclimate, these precipitation and drought extremes would exacerbate other climate problems confronting the state, both flood- and drought-related.

Two key climate change signals in the hydroclimate of California have been identified: progressively less frequent precipitation, particularly in the fall and spring, and greater precipitation extremes. Although these signals tend to cancel each other out in the annual mean precipitation, they exacerbate the natural volatility of the region’s hydroclimate by increasing reliance on the most significant storms of the year to make up the annual total precipitation.

In Southern California, the ups and downs of the annual water supply are dictated by the presence or absence of a few large winter storms. In most cases, these extremely wet storms come in the form of long, narrow water vapor bands known as atmospheric rivers (ARs). ARs are the source of the West Coast’s heaviest rains. ARs are both a hazard and a benefit – they cause most of the West Coast’s floods, but they deliver the majority of their rain and snow that is vital for the region’s water supply. Like hurricanes, atmospheric rivers become more damaging the stronger they are. Scripps researchers found that these storms pose a $1 billion-a-year flood risk in the West. Scientists expect that atmospheric rivers will become an even more significant flood risk as global warming trends increase their intensity. 19 - 81
August 2023 66

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR

4.3 Landslides and Mudflow
Identifying Landslide and Mudflow Hazards
General slope stability is determined by many factors, such as the angle of the slope, vegetative cover, wildland fire, bedrock, soil, seismic activity, precipitation, groundwater, erosion, and human alterations to land, such as hillside grading activities. Slopes may be in temporary equilibrium until one of the factors above is modified by natural or human activity resulting in an unstable condition and potential slope failure.

A landslide is a downward and outward movement of soil and rock. Such a movement occurs when steep slopes are destabilized by excess water accumulation in the soil, the addition of excess weight to the top of a slope, the removal of support from the bottom of a slope, or a combination of the above. The force of rocks, soils, or other debris moving down a slope can devastate anything in its path.

Mudflows, often referred to as "debris flows" or "mudslides," are caused by sustained and intense rainfall accompanied by rocks, vegetation, and other debris. These are fast-moving slope flows and can cause severe damage. The rapid movement and sudden arrival of debris flows pose a hazard to life and property during and immediately following the triggering rainfall. To trigger "debris flows," a storm must have a critical combination of rainfall intensity and duration, leading to saturation of the hill slope soils, generation of positive pore fluid pressures within the soil, and, ultimately, slope failure.

Location
The areas in the City of South Pasadena that are susceptible to Landslides due to severe storms and flooding are the same areas that could be affected by an Earthquake, namely the Monterey Hills neighborhood and the areas surrounding the below-ground section of State Route 110. Refer to Exhibit 10 - City of South Pasadena Potential Landslide Area Map.

Extent
Although landslides can threaten South Pasadena, they are a severe geologic hazard in almost every state and many cities in America. Nationally, landslides cause 25 to 50 deaths each year. The best estimate of direct and indirect costs of landslide damage in the United States ranges between $1 and $2 billion annually. As a seismically active region, California has had a significant number of locations impacted by landslides. Some landslides damage private property, and other landslides impact transportation corridors, fuel and energy conduits, and communication facilities. They can also pose a serious threat to human life. Slow-moving landslides can cause significant property damage but are less likely to result in serious human injuries.
19 - 82
August 2023 67

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Past Occurrences
There have been no significant occurrences of Landslides in the City, although minor mudflows have been reported in the Monterey Hills neighborhood following Severe Storms. Table 19 - Regional Landslides and Mudflows identifies past landslide and mudflow events in and around Los Angeles County.

Table 19 - Regional Landslides and Mudflows
Date Location Type Damage
1983 Southern California Landslides Over 1 Billion Dollars in Damage 1983 San Clemente Landslide Highway 1 Damaged
1983 Big Rock Mesa Landslide 13 Homes Destroyed
1994 Los Angeles County
(Northridge Earthquake) Landslides 11,000 Landslides
Valley Fever Outbreak
1995 Ventura and Malibu Landslides Numerous Homes Destroyed Many Deaths Resulted
2018 Montecito (Santa Barbara County) Mudslides Numerous Homes Destroyed Many Deaths Resulted
Probability of Future Events
According to the Los Angeles County Safety Element, landslide areas exist throughout the region. As stated, the Monterey Hills area in the southwest portion of the city could be a particular area of concern.

Although small in geographic size compared to the rest of the County, the area has the potential for a sizeable disastrous event for the City.

Impacts
During an Earthquake or Severe Storm, a significant Landslide in the Monterey Hills neighborhood could cause homes to slide down the hills onto other homes or roadways. If the homes were occupied, there would be a considerable risk of injury or death to the occupants. In addition, roadways could slide away, hampering rescue operations and creating long-term traffic issues. Dollar amounts to rebuild homes (if possible) and rebuild public roadways would be enormous to both the City and homeowners.

Along the below-ground section of State Route 110, a landslide onto the highway could force the detouring of traffic onto surface streets, causing significant congestion on the City’s arterial roadways.

There would also be financial impacts to the State of California to repair the roadway and surrounding areas to open it back up for vehicular traffic.
19 - 83
August 2023 68

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Vulnerability
Vulnerability assessment for landslides will assist in predicting how different types of property and population groups will be affected by a hazard. Data that includes specific landslide-prone and debris flow locations in the city can be used to assess the population and total value of the property at risk from future landslide occurrences. Factors in assessing landslide risk include population and property distribution in the hazard area, the frequency of landslide or debris flow occurrences, slope steepness, soil characteristics, and precipitation intensity.

The potential for slope failure is dependent on many factors and their interrelationships. Some of the most critical factors include slope height, steepness, sheer strength, the orientation of weak layers in the underlying geologic unity, and pore water pressures. Joints and shears, which weaken the rock fabric, allow water penetration, leading to deeper weathering of the rock along with increasing the pore pressures, the plasticity of weak clays, and the weight of the landmass.

Natural slopes, graded slopes, or graded/natural slope combinations must meet these minimum engineering standards where they impact planned homes, subdivisions, or other types of developments.

In general, slopes adjacent to areas where the risk of economic losses from landslides is small are often allowed a lesser factor of safety.

While a quantitative vulnerability assessment (an assessment that describes the number of lives or amount of property exposed to the hazard) has not yet been conducted for the City of South Pasadena landslide events, many qualitative factors point to potential vulnerability. As mentioned, landslides can impact roadways, blocking residents from essential services and businesses.

Climate Change Considerations
Anticipating that precipitation regimes may change in the future due to climate change, there may be greater opportunity for landslides and mudflows. Current climate change science indicates that storms may become less frequent and more intense, resulting in greater runoff at higher velocities within the various drainages in South Pasadena. With greater amounts of precipitation, underlying soils and rock units could become saturated quicker, increasing the risk of landslides. In addition, if water runoff occurs at greater velocities, there is a more significant potential for erosion, which could induce landslides and mudflows within the city.
19 - 84
August 2023 69

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR

4.4 Wildland and Urban Fires
Identifying Wildland and Urban Fire Hazards
Fire hazards threaten lives, property, and natural resources and present a considerable risk to vegetation and wildlife habitats. Fires occur in wildland and urban areas. A wildfire is an uncontrolled fire spreading through vegetative fuels. Wildfires can be caused by human error (such as campfires), intentionally by arson, by mechanical sources of ignition (such as heaters and generators), and by natural events (such as lightning). Wildfires often occur in forests or other areas with ample vegetation. In areas where structures and other human development meets or intermingles with wildland or vegetative fuels (referred to as the “wildland-urban interface”), wildfires can cause significant property damage and present extreme threats to public health and safety.

Urban fires usually result from sources within structures and are generally related to specific sites and structures. The availability of firefighting services is essential to minimize losses that result from a fire.

Effective fire protection in urban areas is based upon several factors, such as structure age, circulation routes' efficiency (ultimately affecting response times), and availability of water resources to combat fires.

There are three categories of interface fire: The classic wildland/urban interface exists where well-defined urban and suburban development presses up against open expanses of wildland areas; isolated homes characterize the mixed wildland/urban interface, subdivisions and small communities situated predominantly in wildland settings; and the occluded wildland/urban interface exists where islands of wildland vegetation occur inside a primarily urbanized area. Certain conditions must be present for significant interface fires to occur. The most common conditions include hot, dry, and windy weather; the inability of fire protection forces to contain or suppress the fire; multiple fires that overwhelm committed resources; and a large fuel load (dense vegetation). Once a fire has started, several conditions influence its behavior, including fuel topography, weather, drought, and development.

Location
Southern California has two distinct areas of risk for wildland fire. The foothills and lower mountain areas are most often covered with scrub brush or chaparral. The higher elevations of mountains also have heavily forested terrain. The lower elevations covered with chaparral create one type of exposure.

One challenge Southern California faces regarding the wildfire hazard is the increasing number of houses built on the urban/wildland interface. Every year the growing population has expanded further into the hills and mountains, including forest lands. The increased "interface" between urban/suburban areas and the open spaces created by this expansion has significantly increased threats to life and property from fires. It has pushed existing fire protection systems beyond their original or current design and capability.

Property owners in the interface are unaware of their problems and threats. Therefore, many owners have done little to manage or offset fire hazards or risks on their property. Furthermore, human activities increase the incidence of fire ignition and potential damage. 19 - 85
August 2023 70

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Topography influences the movement of air, thereby directing a fire course. For example, if the percentage of uphill slope doubles, the rate of spread in wildfire will likely double. Gulches and canyons can funnel air and act as chimneys, which intensify fire behavior and cause the fire to spread faster. Solar heating of dry, south-facing slopes produces upslope drafts that can complicate fire behavior.

Unfortunately, hillsides with hazardous topographic characteristics are also desirable residential areas in many communities. This underscores the need for wildfire hazard mitigation and increased education and outreach to homeowners living in interface areas.

Weather patterns combined with specific geographic locations can create a favorable climate for wildfire activity. Areas, where annual precipitation is less than 30 inches per year are extremely fire-susceptible.

High-risk areas in Southern California share a hot, dry season in late summer and early fall when high temperatures and low humidity favor fire activity. The so-called “Santa Ana” winds, which are heated by compression as they flow down to Southern California from Utah, create an exceptionally high risk, as they can rapidly spread what might otherwise be a small fire.

Several areas in the City of South Pasadena have been identified as potential areas for urban interface brush fires. These areas are moderate in size ranging from several acres to dozens of acres in size. Most of these identified areas are covered in light to moderate brush with topography ranging from gradual hillsides to very steep hillsides. The fire department assessed the areas identified by utilizing pre-fire planning, which accounts for access, water supply, and strategic, operational planning. Refer to Exhibit 16 - Map of Wildland - Urban Interface indicates the Monterey Hills area of South Pasadena. It is highlighted in yellow on the lower left side of the map. In 1984, in the area marked as “A,” a 5-acre fire broke out in the area of Via del Ray. There has been little to no change since the map was developed in 2010.

Exhibit 16 - Map of Wildland - Urban Interface
Source: City of South Pasadena
A
19 - 86
August 2023 71

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Extent
CalFire tracks Wildland Fires to provide a snapshot of the number of fires and acres burned. These are numbers taken from their Computer Aided Dispatch (CAD) system and the National Incident Management Situation Report. These are good ways to track the number and locations of Wildland Fires Statewide.

These fires range from minor incidents to large, multi-jurisdictional incidents. Lives lost, Acres burned, and property damaged are all indicators of a fire’s size and complexity. Refer to Table 20 - California Wildland Fires January to September 2022
Table 20 - California Wildland Fires January to September 2022 California Wildland Fires January to January 2023
Fire Name Acres
Burned Start Date Notes
Airport Fire 4,136 February 16, 2022 Unknown cause
Coastal Fire 200 May 11, 2022 Burned into a neighborhood and destroyed 20 homes Lost Lake Fire 5,856 May 26, 2022 Unknown cause
Thunder Fire 2,500 June 22, 2022 Likely caused by a lightning strike Roblar Fire 63 June 27, 2022 Unknown cause; one fatality after being trapped in a vehicle
Electra Fire 4,478 July 4, 2022 Unknown cause, possibly fireworks celebrations Washburn Fire 4,886 July 7, 2022
Human-caused, forced evacuations in Wawona and
trail closures in Yosemite National Park; threatened
Mariposa Grove
Oak Fire 19,244 July 22, 2022
Unknown cause forced evacuations in Mariposa
County. Destroyed 182 structures and damaged ten
structures
McKinney Fire 60,138 July 29, 2022 Possibly caused by power lines; destroyed 185 structures, and caused four fatalities
Yeti Fire 7,886 July 29, 2022 Probable lightning-caused, forced evacuations in Siskiyou County, originally named the China 2 fire
Summit Fire 1,394 August 3, 2022 Caused by lightning, being suppressed using indirect methods, burning in southern Sequoia National Park
Red Fire 8,364 August 4, 2022 Lightning caused burning in Yosemite National Park, not being entirely suppressed due to natural barriers
Six Rivers Lightning
Complex 41,596 August 5, 2022
Caused mandatory evacuations in Trinity and
Humboldt counties, composed of multiple lightning
fires that eventually merged into the Campbell Fire
and Ammon Fire
Rodgers Fire 2,790 August 8, 2022 Lightning caused burning in Yosemite National Park, not being entirely suppressed due to natural barriers
19 - 87
August 2023 72

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 20 - California Wildland Fires January to September 2022 (Continued) Fire Name Acres
Burned Start Date Notes
Route Fire 5,208 August 31, 2022 Burned near Interstate 5 and Castaic Lake, one structure destroyed and seven firefighters injured
Border 32 Fire 4,456 August 31, 2022 Burned near U.S./Mexico border, ten structures destroyed
Mountain Fire 13,440 September 2, 2022 Burned seven miles SW of Gazelle, four structures destroyed
Mill Fire 3,935 September 2, 2022
Burned in/near communities of Weed and Lake
Shastina, destroyed 118 structures, caused two
fatalities
Radford Fire 1.079 September 2, 2022 Burning near Big Bear Lake, has caused evacuations in the region
Fairview Fire 28,307 September 5, 2022 Burning near Hemet, caused two fatalities and destroyed 36 structures
Mosquito Fire 76,788 September 6, 2022 Burning near Foresthill, has caused evacuations in Placer and El Dorado County. 78 structures destroyed
Fork Fire 819 September 7, 2022 Caused by a vehicle, destroyed 43 structures near North Fork
Barnes Fire 5843 September 7, 2022 Caused by lightning, burned near Fort Bidwell in the Warner Mountains
Past Occurrences
A sizeable urban fire occurred in 1895 in South Pasadena at the historic Raymond Hotel. On November 17, 1886, the magnificent 400-room Hotel Raymond was formally opened. The hotel was a large frame structure costing $400,000 at the time, construction on which had been started in 1884. On Easter Sunday, 1895, a spark from a chimney set the roof on fire, and the hotel and all its contents burned to the ground in 40 minutes. At the time, 165 guests were staying at the hotel, but most were at church. As fortune would have it, no one was hurt, though all their possessions were lost. Nothing was left standing but the chimney. In 1984, in the area known Monterey Hills, a five-acre fire broke out in the area of Via del Ray.

It was contained by the South Pasadena Fire Department and mutual aid fire agencies. A large area of vegetation burned, and some homes were damaged.

Figure 6 - Raymond Hotel - Before, During, and After Fire Source: City of South Pasadena Library
19 - 88
August 2023 73

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Probability of Future Events
Southern California's hills and mountainous areas are considered interface areas. The development of homes and other structures is encroaching onto the wildland and is expanding the wildland/urban interface, creating the probability of increased Wildland Fires. The interface neighborhoods are characterized by various housing structures, development patterns, ornamental and natural vegetation, and natural fuels.

In a wildfire, vegetation, structures, and other flammables can merge into unwieldy and unpredictable events. Factors critical to fighting such fires include access, firebreaks, the proximity of water sources, distance from a fire station, and available firefighting personnel and equipment. Reviewing past wildland/urban interface fires shows that many structures are destroyed or damaged for one or more of the following reasons:
• Combustible roofing material;
• Wood construction;
• Structures with no defensible space;
• Fire department with poor access to structures;
• Subdivisions located in heavy natural fuel types;
• Structures located on steep slopes covered with flammable vegetation; • Limited water supply; and
• Winds over 30 miles per hour.

Continued development into the interface areas will significantly impact the wildland/urban interface.

Periodically, the historical losses from wildfires in Southern California have been catastrophic, with deadly and expensive fires going back decades. The continued growth and development increase the public need for Local Hazard Mitigation Planning in Southern California.

Vulnerability
Exhibit 17 - CalFire Fire Hazard Map - Very High Fire Hazard Severity Zones (VHFHSZ) in Local Responsibility Area indicates that the City of South Pasadena is not considered a very high fire risk by CalFire in its current map. However, the Monterey Hills area was considered a High Fire Hazard Severity Zone in previous CalFire map versions. The area is currently inspected, and clearance and cleanup are enforced utilizing the same brush clearance standards as in CalFire High Fire Hazard Severity Zones. Access to many areas of the hills is challenging due to narrow roadway widths and on-street parking. Efforts have been ongoing for the past few years to review on-street parking as it relates to safe evacuation of the public and appropriate access for fire apparatus.
19 - 89
August 2023 74

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Exhibit 17 - CalFire Fire Hazard Map
Fire and Resource Assessment Program
Very High Fire Hazard Severity Zones (VHFHSZ) in Local Responsibility Area Source: CalFire Office of the State Fire Marshal
Climate Change Considerations
Recent concerns about the effects of climate change, particularly drought, are contributing to concerns about wildfire vulnerability. The term drought is applied to a period in which an unusual scarcity of rain causes a serious hydrological imbalance. Unusually dry winters, or significantly less rainfall than average, can lead to relatively drier conditions and leave reservoirs and water tables lower. Anticipating that precipitation regimes may change in the future due to climate change, there may be more significant opportunitiesfor wildfire hazards throughout the State of California. Increased future droughts and hotter temperatures could increase fuel loads within wildland areas increase the risk associated with wildland fires.
19 - 90
August 2023 75

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR

4.5 Hazardous Materials and Human-Caused Events
Identifying Hazardous Material Release Hazards
“Hazardous materials” covers a large number of substances that are a danger to the public. These include toxic metals, chemicals, and gases; flammable and/or explosive liquids and solids; corrosive materials; infectious substances; and radioactive materials. The City of South Pasadena has adopted a Hazardous Materials Ordinance which requires that the city be notified of all use, storage, and transport of hazardous materials.

In addition to the immediate risk to life safety, public health, and air quality, the potential for water source contamination, and the potential environmental impacts of accidental hazardous materials releases and toxic substances, there is also concern over the long-term public health and environmental impacts that may result from the sustained use of or exposure to certain substances. An incident could result in the evacuation of a few people, a section of a facility, or an entire neighborhood.

Location
The greatest probability of a major hazardous material incident is from a transportation accident. Even though South Pasadena has a major highway (State Route 110) that runs through the city, trucks over three tons are excluded. However, there are five major roadways used that are used as trucking routes (including local traffic) that are an alternate to SR 110. These include:
• Pasadena Avenue (West City limits to Mission Street)
• Mission Street (Pasadena Avenue to Fair Oaks Avenue)
• Fair Oaks Avenue (North City limits to Huntington Drive) • Huntington Drive (South City limits to Garfield Avenue) • Fremont Avenue (Huntington Drive to South City limits) A large number of the trucks that transport goods throughout the city pass through the area described above. A significant number of them are transporting cargo along these transportation corridors that are considered hazardous materials. A HazMat incident along one of these streets would affect most areas within the city.

Extent
Hazardous materials are everywhere and are accidentally released or spilled frequently during any day. In 2017, the California State Warning Center received approximately 11,000 hazardous material spill reports on hazardous material incidents and potentially hazardous material incidents. Most of these incidents are minor, but some cause significant impacts, such as injuries, evacuation, and the need for cleanup. Refer to Table 21 - Hazardous Materials Releases in California (Partial January 2023) for the incidents reported to CalOES statewide.
19 - 91
August 2023 76

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 21 - Hazardous Materials Releases in California (Partial January 2022) Hazardous Materials Releases Reported to CalOES in 2022 Type Date / Time County City Location
SPILL Report 10/12/2022 02:14 PM SoCal Gas
SPILL Report 10/18/2022 11:10 AM Santa Barbara County Santa Barbara Waterways SPILL Report 10/18/2022 10:59 AM Alameda County Alameda Ship/Harbor/Port SPILL Report 10/18/2022 10:21 AM Kern County Bakersfield Railroad SPILL Report 10/18/2022 10:04 AM Humboldt County Recology Road SPILL Report 10/18/2022 09:53 AM Butte County Durham Merchant/Business SPILL Report 10/18/2022 09:54 AM Los Angeles County Long Beach Rail Road SPILL Report 10/18/2022 09:21 AM Kern County Bakersfield Merchant/Business SPILL Report 10/18/2022 08:40 AM Tulare County Porterville Residence SPILL Report 10/18/2022 08:34 AM Santa Barbara County Santa Maria Other - Petroleum SPILL Report 10/18/2022 08:13 AM Riverside County Temecula Merchant/Business Past Occurrences
The City of South Pasadena has been fortunate to escape the impact of a major hazardous materials release. However, several minor incidents have been consistent with the characteristics of a community like South Pasadena.

Most hazardous materials incidents have occurred in transport corridors such as freeways and other major transport arteries. The most significant of these releases have consisted of petroleum products such as gasoline and diesel fuel. Previous hazardous materials incidents do not accurately reflect the city's vulnerabilities.

Probability of Future Events
Although past occurrences can indicate future impacts, in the case of hazardous materials spills, the City is constantly improving the mechanisms by which they approve and regulate businesses that use hazardous materials. In addition, technological advances and increases in industry standards are also improving safety and further preventing/ minimizing potential releases of hazardous materials. As a result, future incidents will decrease as newer technologies, standards, and regulations are implemented.

Vulnerability
With the volume of traffic that flows along the described transportation routes described above, there is a possibility that a hazardous materials release will occur as the result of an accident. An accident of this type would close the freeway or street for several hours requiring traffic to detour through South Pasadena streets. In an accident involving a vehicle carrying hazardous materials such as toxic gas, the populated business and residential areas adjacent to the highway would have to be evacuated. 19 - 92
August 2023 77

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
The South Pasadena Fire Department (SPFD) is responsible for responding to hazardous materials incidents in the city. The SPFD is limited in its response capabilities to the level defined by the California State Fire Marshall First Responder – Operational training standard. This standard limits the SPFD response to the following actions:
• Safety - Identifying and assigning a safety officer
• Isolation - Isolating and evacuating the affected area • Notification - Notify appropriate regulatory agencies and start a mitigation response • Command - Initiate an incident management system
• Identify - Attempt to identify the released materials • Action Planning - Develop an action plan in conjunction with responding mitigation agencies Currently, the City of South Pasadena enjoys the benefits of a Unified Response mutual aid system administered by the Verdugo Fire Communications System. Verdugo would provide a qualified hazardous materials response unit in a hazardous materials incident. If a Verdugo unit is unavailable, the County of Los Angeles and the City of Los Angeles would be willing to provide hazardous materials units to the city.

The South Pasadena Police Department (SPPD) is responsible for maintaining the free flow of traffic through the City’s transportation corridors and providing for the general public's safety. In the event of a hazardous materials spill/release, it would be the SPPD’s responsibility to cordon off the area limiting access to only the appropriate emergency response personnel. In addition, SPPD personnel would be responsible for any necessary evacuations.

Climate Change Considerations
Anticipating that precipitation regimes may change in the future due to climate change, there may be a greater opportunity for the release of hazardous materials to enter local waterways and the groundwater aquifer. It is anticipated that if this concern increases, the City and other regulating agencies will re-visit procedures and practices to ensure that the greatest amount of protection occurs. 19 - 93
August 2023 78

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR

4.6 Windstorm
Identifying Windstorm Hazards
A windstorm is an event that is strong enough to cause at least light damage to trees and buildings and may or may not be accompanied by precipitation. Wind speeds during a windstorm typically exceed 34 miles per hour. Wind damage can be attributed to gusts (short bursts of high-speed winds) or more extended periods of stronger sustained winds. Although tornadoes and tropical cyclones produce wind damage, they are usually classified separately.

Location
The complex terrain of southern California, as illustrated in Exhibit 18, poses several forecast challenges for various types of wind events that impact the region. For example, there are well-documented “sundowner” winds along the Santa Ynez Range of Santa Barbara County. There are also the infamous and heavily researched Santa Ana winds that can fuel large wildfires throughout much of southern California. Another less well-known wind event type is the “Palmdale Wave,” which is associated with a strong north wind. The San Gabriel Mountains also play an important role in damaging northerly wind events that impact the San Gabriel Valley and eastern portions of the San Fernando Valley.

Exhibit 18 - Southern California Terrain Map
Source: NOAA/NWS Oxnard
19 - 94
August 2023 79

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Santa Ana winds, out of the Northeast or East-Northeast, usually result in little or no wind for the San Gabriel Valley and Los Angeles Coastal Plain. Instead, Santa Ana winds typically funnel through the lower mountain ranges in western Los Angeles County and continue down through the Santa Clarita Valley and the valleys of Ventura County. The western portions of the San Fernando Valley and the Santa Monica Mountains often experience gusty winds during Santa Ana events. Although damaging winds in the foothill and valley areas immediately south of the San Gabriel Mountains are very rare with Santa Ana events, it should be noted that mountain wave activity and downslope winds would be possible with a meteorological wind direction as northeasterly.

During strong Northwest wind events, damaging winds can occur through the Interstate 5 Corridor and down through the Santa Clarita Valley. Occasionally damaging winds reach the northern San Fernando Valley during Northwest wind events but rarely reach the San Gabriel Valley. So, it can be seen that unique conditions are required for damaging winds to occur in the San Gabriel Valley, as it is often sheltered from the more common Northwest and Northeast wind events.

Extent
Winds are horizontal flows of air that blow from areas of high pressure to low pressure. Wind strength depends on the difference between the high-and low-pressure systems and the distance between them.

A steep pressure gradient results from a large pressure difference or a short distance between these systems and causes high winds. High winds are defined as those that last longer than one hour at greater than 35 miles per hour (mph) or for any length of time at greater than 57 mph. Winds measured at over 75 mph are considered in a Hurricane category.

Past Occurrences
Windstorms have occurred numerous times in Southern California. One of the most damaging occurred in December of 2011 when a powerful windstorm deprived approximately 80,000 homes and businesses of power for three days in San Gabriel Valley communities. Residents remained without power in Pasadena, Temple City, San Marino, and Arcadia. It knocked over numerous trees and broke power lines.

At the wind event's peak, more than 400,000 electric power customers throughout Los Angeles County lost power, and around 235,000 in San Gabriel Valley. Refer to Table 22 below.

Table 22 - Damaging Wind Events from 1979 to 2014
Damaging Wind Events (1979 – 2014)
January 12, 1985 January 6, 1997
February 21, 1985 January 6, 2003
November 23, 1986 December 30, 2010
February 17, 1988 December 1, 2011
January 1, 1996
19 - 95
August 2023 80

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Probability of Future Events
Damaging wind events in the San Gabriel Valley can be difficult to predict for several reasons. One reason is that damaging northerly wind events, such as the December 1, 2011 event, are very rare.

Another reason is that Santa Ana events, associated with Northeast to East-Northeast winds for parts of Los Angeles County, typically produce very little wind in the San Gabriel Valley; however, the synopticscale conditions can be similar to northerly wind events such as the December 1, 2011 event. The complex terrain of Los Angeles County and the relatively coarse resolution of numerical models commonly used can make forecasting wind events in the San Gabriel Valley difficult, as models cannot fully resolve the winds in the boundary layer, let alone forecast small-scale details such as mountain waves and downslope wind storms.

Impacts
Based on the region's history, windstorm events can be expected, perhaps annually, across broad areas of the region. The City of South Pasadena and the surrounding region can be adversely impacted during a windstorm. This can involve the City of South Pasadena’s emergency response personnel during a wideranging windstorm or microburst tornadic activity.

Both residential and commercial structures with weak reinforcement are susceptible to damage. Wind pressure can create a direct and frontal assault on a structure, pushing walls, doors, and windows inward.

Conversely, passing currents can create lift suction forces that pull building components and surface outward. Extreme wind forces the roof or entire building to fail, causing considerable damage. Debris carried along by extreme winds can directly contribute to loss of life and indirectly to the failure of protective building envelopes, siding, or walls. When severe windstorms strike a community, downed trees, power lines, and damaged property can be significant hindrances to emergency response and disaster recovery.

Historically, falling trees have been the primary cause of power outages in the region. Windstorms such as strong microbursts and Santa Ana Wind conditions can cause flying debris and downed utility lines. For example, tree limbs breaking in winds of only 45 mph can be thrown over 75 feet. Overhead power lines can be damaged even in relatively minor windstorm events. Falling trees can bring electric power lines down to the pavement, creating the possibility of lethal electric shock. Rising population growth and new infrastructure in the region create a higher probability of damage from windstorms as more life and property are exposed to risk.

Windstorms can damage buildings, power lines, and other property and infrastructure due to falling trees and branches. During wet winters, saturated soils cause trees to become less stable and more vulnerable to uprooting from high winds.

Windstorms can result in collapsed or damaged buildings or blocked roads and bridges and damaged traffic signals, streetlights, and parks, among others. Roads blocked by fallen trees during a windstorm may have severe consequences for people who need access to emergency services. When interrupted by blocked roads or power supplies, emergency response operations can be complicated. Industry and 19 - 96
August 2023 81

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
commerce can suffer losses from electric service interruptions and extended road closures. They can also sustain direct losses to buildings, personnel, and other vital equipment. There are direct consequences to the local economy resulting from windstorms related to physical damages and interrupted services.

Perhaps the greatest danger from windstorm activity in Southern California comes from the combination of the Northwest winds with the major fires that occur every few years in the urban/wildland interface.

With the Northwest winds driving the flames, the speed and reach of the flames are even greater than in times of calm wind conditions. The higher fire hazard a Northwest wind condition raises requires even more care and attention to proper brush clearances on property in the wildland/urban interface areas.

Windstorm activity can impact local transportation in addition to the problems caused by downed trees and electrical wires blocking streets and highways. During powerful Santa Ana winds, major highways can temporarily close to truck and recreational vehicle traffic. However, typically these disruptions are not long-lasting, nor do they carry a severe long-term economic impact on the region.

Vulnerability
The entire City of South Pasadena and all critical facilities are susceptible to windstorm damage. A majority of windstorm damage that occurs is associated with fallen trees and tree limbs. Facilities located close to large trees may be more susceptible to windstorm damage. It is improbable that a windstorm would destroy any of the identified critical facilities. However, the replacement values for these facilities may be referenced in Table 6: South Pasadena Critical Facilities List.

Climate Change Considerations
It is anticipated that wind patterns and windstorm development may be altered due to climate change.

The resulting change could increase future storm intensity and duration and potentially change the location of where these storms are generated. With this in mind, it will be necessary for the City to consider how anticipated changes in weather patterns may change future events and how they respond and mitigate hazards associated with windstorms.
19 - 97
August 2023 82

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR

4.7 Drought and Water Resources
Drought
Identifying Drought Hazards
A drought is a period of dry weather that persists long enough to cause problems such as crop damage or water supply shortages. Droughts can occur in short durations (single-year occurrence) or persist for several years (multi-year), impacting hydrologic cycles and biological communities. Droughts may not be predictable, but they should be expected. They occur with some regularity and varying levels of severity.

The magnitude and duration of drought can be predicted based on historical records and should be considered in water resource planning.

Water Resources
Groundwater is an essential component of our nation’s freshwater resources. Groundwater use is of fundamental importance to human life and is also significant to economic vitality. Inventories of groundwater and surface water use patterns in the United States emphasize the importance of groundwater. The United States Geological Survey (USGS) compiles national water use information every five years and publishes a report that summarizes this information. Groundwater is a hidden resource. At one time, its purity and availability were taken for granted. Now contamination and availability are serious issues. The following should be considered:
• Scientists estimate groundwater accounts for more than 95% of all freshwater. • Approximately 50% of Americans obtain all or part of their drinking water from groundwater. • Nearly 95% of rural residents rely on groundwater for their drinking supply. • About half of irrigated cropland uses groundwater.
• Using groundwater fulfills approximately one-third of industrial water needs. • About 40% of river flow nationwide (on average) depends on groundwater.

Location
Droughts can occur over large regions (multiple states) or be isolated to small areas such as a city or county. The Los Angeles County Hazard Mitigation Plan notes the entire county is susceptible to and at risk of drought conditions. Likewise, the City of South Pasadena is susceptible to drought.

The City has four wells located within the Main Basin: Graves Well No. 2, Wilson Well No. 2, Wilson Well No. 3, and Wilson Well No. 4, with approximate pumping capacities of 705 GPM, 750 GPM, 1,960 GPM, and 1,100 GPM, respectively, although Wilson Well No. 2 is inactive. The collective capacity is about 5,000 GPM.

Groundwater from Graves Well No. 2 is pumped into the Graves reservoir, and groundwater from the Wilson Wells is pumped into the Wilson reservoir. The Graves reservoir has a capacity of 1.0 million gallons 19 - 98
August 2023 83

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
RAYMOND Drive
Columbia Street
(MG) and the Wilson reservoir has a capacity of 1.3 MG. A booster station at each well site pumps water through a transmission main that leads to the Garfield reservoir, updated in 2017, with a total capacity of

6.5 MG located within the City’s service area. The Garfield reservoir provides water to two distribution reservoirs, the Grand and Westside Reservoirs, and two elevated steel tanks, the Raymond Hill Tank and Bilicke Tank, within the City’s service area.

The City’s distribution system contains four pressure zones: the Raymond Zone, the Central Zone, the Bilicke Zone, and the Pasadena Zone. The Raymond Zone, the Central Zone, and the Bilicke Zone receive water from the City’s system. In contrast, the Pasadena Zone, located at the top of Raymond Hill, receives water from the City of Pasadena. The City can also deliver water to Raymond Hill Tank when the City of Pasadena cannot supply water to the Pasadena Zone.

Exhibit 19 - Map of Water Pressure Zones
Source: City of South Pasadena
Extent
One approach to supplementing California's limited period of measured data is to statistically reconstruct data through the study of tree rings (called dendrochronology). Information on the thickness of annual growth rings can be used to infer the wetness of the season. Site-specific approaches to supplementing the historical record can include age-dating dryland plant remains now submerged in place by rising water levels or sediment and pollen studies. For example, a 1994 study of relict tree stumps rooted in presentday lakes, rivers, and marshes suggested that California sustained two epic drought periods extending over more than three centuries. The first epic drought lasted more than two centuries before the year 1112; the second drought lasted more than 140 years before 1350. In this study, the researcher used drowned tree stumps rooted in Mono Lake, Tenaya Lake, West Walker River, and Osgood Swamp in the 19 - 99
August 2023 84

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
central Sierra Nevada. These investigations indicate that California has been subject to droughts more severe and more prolonged than those witnessed in the brief historical record.

The Drought Monitor was introduced as a weekly operational product in 1999 to provide an overview of conditions averaged across a broad array of time scales and impact indicators, leaning toward those that seem most relevant to observed impacts. This approach has led to unprecedented cooperation and coordination among disparate Federal, state, and local government agencies and many interested academic and private research community members. The result has boiled the complex issues of drought and drought-related impact assessment down to a simple, visually intuitive summary of conditions that have replaced the uncoordinated, disparate, and often contradictory assortment of opinions and data that formerly characterized response requests for drought information.

The following exhibits show how droughts are monitored throughout the Country. The first one (Exhibit 20) shows the level of drought in October 2022, while the second one (Exhibit 21) shows the level of drought in July of 2023. These tools are helpful to agencies in planning for drought emergencies.

Exhibit 20 - October 11, 2022 California Drought Monitor Source - Droughtmonitor.unl.edu
19 - 100
August 2023 85

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Exhibit 21 – July 25, 2023 California Drought Monitor
Source - Droughtmonitor.unl.edu
An increased quantity of groundwater is being withdrawn to meet the demands of a growing population.

Some typical threats associated with this include overdraft, drawdown, and subsidence. An overdraft occurs when groundwater is removed faster than recharge can replace it. This can result in the following:
• Permanent loss of a portion of its storage capacity.
• Change that can cause water of unusable quality to contaminate good water in coastal basins where saltwater intrusion can occur.

Generally, any withdrawal over safe yield (the amount that can be withdrawn without producing an undesirable result) is an overdraft. Drawdown differs significantly from overdraft. It results in a temporarily lowered water table generally caused by pumping. In this situation, the water table recovers when the supply is replenished.

Subsidence is one of the dramatic results of over-pumping. As the water table declines, water pressure is reduced. This causes the fine particles that held water to become compacted. In addition to permanently reducing storage capacity, the land above the aquifer can sink from a few inches to several feet, causing a sinkhole.

Past Occurrences
In recent history, Los Angeles County was impacted by four statewide drought occurrences: 1976-77, 1987- 1992, 2007-2009, 2011-2017, and 2019-2022. Table 23 - Historical Drought Events presents the impacts of drought in the City of South Pasadena.
19 - 101
August 2023 86

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 23 - Historical Drought Events
Date Impact/Property Damage
1863-1864 Statewide - Unknown
1877 Statewide - Unknown
1928-1937 Reported as one of the most prolonged and severe in state history.
1947-1949 Statewide
1976-1977 Water conservation ordered
1987-1992 Severe drought, water conservation ordered
2007-2009 Water waste regulations are strictly enforced; local water providers request voluntary 15% conservation savings.
2011-2018 The period between late 2011 and 2018 was the driest in California history since record-keeping began
2020-2023 The drought conditions from the past decade have continued into the current decade.

Probability of Future Events
One approach to evaluating the probability of future events focuses on the magnitude of the worst-case drought because the degree of shortfall determines what actions the community would take and the resulting hardships the public would face. It should also considerthe chance of that event occurring before a solution is achieved. The amount of time that elapses before new supply can be developed is an essential consideration because it also has a bearing on the degree of risk faced by water customers; the longer the delay, the greater the risk.

The City is exploring multiple avenues to conserve water throughout the city for residential and commercial facilities. Goal II of the South Pasadena Green Action Plan is to Enhance Water Conservation Projects and Programs and includes a series of strategies and actions to promote water conservation efforts throughout the City. Strategies include providing education and promoting greywater systems, using water conservation devices, providing educational materials and expert advice on water conservation practices, and increasing conservation efforts outdoors.

Impacts
The City of South Pasadena was impacted by the ongoing drought that affected the State over the past few years. The City had declared a Stage 2 Serious Water Supply Shortage and placed limits on watering days in order to ensure enough water to sustain the city moving forward. Watering or irrigation of lawn, landscape, or other vegetated areas, was limited to two designated days per week. In addition, leaks were to be repaired within 48 hours of notification. Other permanent water restrictions also applied. The City’s Water Conservation Ordinance mandates year-round water use efficiency best practices. Residents and businesses must practice measuressuch as not watering their landscape between 9:00 a.m. and 5:00 p.m.

Large. New landscapes must follow water-efficient guidelines detailed in the City's Water Efficient 19 - 102
August 2023 87

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Landscape Ordinance. The following watering restrictions are effective at all times regardless of what water supply stage the City is experiencing:
• Watering between the hours of 9:00 a.m. and 5:00 p.m. is prohibited • Excessive water run-off from sprinklers/irrigation is prohibited • Watering during periods of rain and 48 hours after is prohibited • Washing down hard or paved surfaces is prohibited
• Vehicles must be washed with a hose equipped with a shutoff nozzle • Watering is limited to 15 minutes per station per day • Using water to clean, fill or maintain levels in decorative fountains, ponds, or other similar aesthetic structures is prohibited unless the structure uses a recirculating water system.

Vulnerability
The responsibility for groundwater protection collectively belongs to federal, state, and local government agencies. Federal and state governments regulate groundwater through laws, regulations, and policies. In many cases, state and local laws are stricter versions of federal legislation, which serves as a valuable baseline for building state and local laws. The City’s UWMP pinpoints action items with directions on specific activities that the city, organizations, and or residents of South Pasadena can undertake or implement to reduce the risk and prevent the loss of services in the event of a significant water issue.

The City of South Pasadena drought mitigation action items provide direction and specific activities that the City, organizations, and residents in the City of South Pasadena can undertake to reduce the risk and prevent the impact of a drought or other supply issues or conditions that may have an impact on the residents and or water operations within the City of South Pasadena. The UWMP Act (Water Code Sections 10610 through 10656) requires that every urban water supplier provides and adopts an Urban Water Management Plan (UWMP). The City updated and published its Urban Water Management Plan in 2020, published in September 2021. Since then, the City’s Water Division has updated some items in the plan, and they are currently being discussed for future implementation or adoption through City Council approval. The UWMP is kept on file in the offices of the South Pasadena Water Department.

Climate Change Considerations
According to the City’s UWMP, consistent future use of groundwater sources may be affected by climate change. Climate change forecasts indicate a potentially significant decrease in the recharge of groundwater basins. Due to climate change, the City of South Pasadena may expect more severe droughts.
19 - 103
August 2023 88

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR

4.8 Reservoir Failure
Identifying Reservoir Failure Hazards
There are 103 dams in Los Angeles County, owned by 23 agencies or organizations, ranging from the Federal government to Home Owner Associations. These dams hold billions of gallons of water in reservoirs. Releases of water from the major reservoirs are designed to protect Southern California from floodwaters and to store domestic water. Seismic activity can compromise the dam structures, and the resultant flooding could cause catastrophic flooding. Following the 1971 Sylmar earthquake, the Lower Van Norman Dam showed signs of structural compromise, and tens of thousands of persons had to be evacuated until the dam could be drained. The dam has never been refilled.

California Government Code § 8589.5 (1972) requires dam owners to submit to the Office of Emergency Services maps showing inundation zones for catastrophic dam failure. The Office of Emergency Services is responsible for designating areas with a potential loss of life and reviewing procedures for population control and evacuation below dams in the event of a dam failure.

Location
Devil’s Gate Dam and Reservoir is a stormwater and flood management facility located in the City of Pasadena, approximately 14 miles north of downtown Los Angeles. It is immediately north of Interstate Highway 210, near the Rose Bowl Stadium, and south of the San Gabriel Mountains. It is located where the Arroyo Seco stream emerges from the mountains into the alluvial plain. The dam separates the upper and lower watersheds of the Arroyo Seco Channel. It provides significant storage capacity for stormwater runoff originating from approximately 20,416 acres (31.9 square miles) of primarily undeveloped land north in the San Gabriel Mountains. The Raymond Basin underlies the dam and reservoir area.

Devil’s Gate Reservoir area covers approximately 175 acres (0.27 square miles) and has a design storage capacity of 4,600 acre‐feet (AF). Devil’s Gate Dam is a Concrete Gravity Arch Structure. It is 100 feet high, 310 feet long, 30 feet wide at its crest, and 99 feet wide at its buttress. The dam is under the jurisdiction of the California Department of Water Resources Division of Safety of Dams (DSOD).

Completed in 1920, the Devil’s Gate Dam and Reservoir facility was the first flood control facility built by the Los Angeles County Flood Control District to provide flood protection to the Cities of Pasadena, South Pasadena, and Los Angeles. It continues to serve this function today by capturing sediment washed into the reservoir by storm flows, attenuating storm flows, and subsequently controlling water releases to the downstream Arroyo Seco Channel. The Dam protects an inundation area of 1,783 acres, including 3,590 parcels, and 10.3 million square feet of structures. Downstream of Devil’s Gate Dam, the lower half of the Arroyo Seco watershed is distinctly different from the upper watershed. The stream is channelized chiefly downstream, and the watershed is highly urbanized.
19 - 104
August 2023 89

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Extent
Reservoir or dam failure generally occurs for one of three reasons: ground shaking from an earthquake in excess of design assumptions, structural instability, or heavy rains over design capacity. In addition, reservoirs and dams located in seismically active regions may overtop due to seiche during seismic activity or seismically-induced landsliding. The resulting disaster could affect downstream communities and neighborhoods in the inundation area.

Figure 7 - Devil’s Gate Dam and Reservoir
Source: Los Angeles County Flood Control District

Previous Occurrences
In 2009, the Station Fire burned over 160,000 acres in the San Gabriel Mountains. This was the largest fire in Angeles National Forest's recorded history. Approximately 68 percent of the watershed tributary to Devil's Gate Reservoir (approximately 100 percent of the undeveloped portion) was burned, making sediment deposition inevitable during subsequent storm events. Following this unprecedented burn of the watershed, the storms that occurred in the two wet seasons after the fire deposited more than one million cubic yards combined.

Over the last three years, Los Angeles County Public Works removed 1.3 million cubic yards of sediment from Devil’s Gate Reservoir. This allowed the Devil’s Gate Dam to regulate high runoff flows during the 2021-22 storm season to mitigate flood risk to communities downstream.

Public Works conducted its annual reservoir maintenance from September 1, 2022, to December 15, 2022, to prepare the facility for the yearly storm season. The work included clearing vegetation within the reservoir basin and excavating excess sediment that washed in during the past storm season. Additional time is factored in for the erosion repairs along the side slopes and the re-building of a low-flow diversion and two low-flow channels along the side slopes that serve the two maintenance areas at the bottom of the reservoir.
19 - 105
August 2023 90

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Probability of Future Events
The Devil's Gate Dam routinely undergoes inspection and maintenance by the County of Los Angeles. Any deficiencies in the dam construction would be noticed, and measures would be taken for repairs. In the event of a severe storm, the County would have the ability to let out water into the Arroyo in a controlled manner to relieve pressure on the dam and prevent overtopping.

Impacts
A catastrophic dam failure would create a severe flooding situation along the Arroyo and impact the area within the flood zone. The City’s Golf Course, Racquet Ball facility and the San Pasqual Stables would face significant damage.

Vulnerability
The possibility of future reservoir failure or leaks cannot be discounted based on the region's susceptibility to earthquake damage. Ongoing responsibility for maintaining and inspecting the reservoirs belongs with the Los Angeles County Flood Control District to prevent future occurrences. 19 - 106
August 2023 91

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR

4.9 Summary of Vulnerability

4.9.1 SIGNIFICANT, MODERATE, AND LIMITED HAZARDS
Vulnerability assessments within each hazard profile are used to understand the varying levels of risk to the City of South Pasadena. Based on these assessments, LHMP planning personnel concluded that some facilities involve Significant Risk, some involve Moderate Risk, and some are Limited Risk.

4.9.2 PLANNING ANALYSIS BY FACILITY
Using the CPRI Risk Assessment for the City of South Pasadena (refer to Tables 9 and 10) to determine the overall risks posed to the City by the hazards listed in Table 8 and the detailed assessment made for the City using the Hazard Planning Analysis Worksheet (Table 12), an analysis was made for each facility using the Table 11 Worksheet.

Table 22 - Planning Consideration Assessments by Facility shows a summary of critical facilities intersecting with South Pasadena's hazard areas. Those facilities that intersect with a hazard area are indicated with an “S” for Severe, an “M” for Moderate Risk, and an “L” for Limited Risk. A blank box notes that the hazard does not apply to that facility.
19 - 107
August 2023 92

CITY OF SOUTH PASADENA

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 24 - Planning Consideration Assessments by Facility Facility Earthquake
Severe
Storms and
Localized
Flooding
Landslides and
Mudflow
Wildland and
Urban Fire
Hazmat and
Human
Caused
Windstorms Drought Reservoir
Failure
1 City Hall L L M L L
2 Council
Chambers L L M L L
3 Police
Department L L M L L
4 Fire
Department L L M L L
5 Library &
Community
Room

S S L L L
6 Senior Center M L L L L
7 Eddie Park
House S L L L L
8 War Memorial S S M L L
9 Orange Grove
Recreation
Building

S L M L L
Hazard Planning Considerations: S - Significant Risk M - Moderate Risk L - Limited Risk 19 - 108
August 2023 93

CITY OF SOUTH PASADENA

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 24 - Planning Consideration Assessments by Facility (Continued) Facility Earthquake
Severe
Storms and
Localized
Flooding
Landslides and
Mudflow
Wildland and
Urban Fire
Hazmat and
Human
Caused
Windstorms Drought Reservoir
Failure
10 Meridian Iron
Works Museum S L L L L
11 Garfield Park
Youth House L L L L L
12 Public Works
Yard M L L L L
13 Garfield
Reservoir L L L L L
14 Grand Reservoir L L L L L L L
15 Westside
Reservoir L L L L L L
16 Kolle
Interconnection S L L L L L L
17 Indiana Pump
Station S L L L L L L
18 Bilicke Tank S L L L L L
Hazard Planning Considerations: S - Significant Risk M - Moderate Risk L - Limited Risk 19 - 109
August 2023 94

CITY OF SOUTH PASADENA

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 24 - Planning Consideration Assessments by Facility (Continued) Facility Earthquake
Severe
Storms and
Localized
Flooding
Landslides and
Mudflow
Wildland and
Urban Fire
Hazmat and
Human
Caused
Windstorms Drought Reservoir
Failure
19 Raymond Tank S L L L L
20 Wilson
Reservoir L L L L L
21 Wilson Well #2 L L L L L
22 Graves
Reservoir L L L L L
23 San Pasqual
Stables S M M L L L L L
24 Arroyo Seco
Golf Course M M L L M L L L
25 Arroyo Seco
Racquet Club S M L L M L L L
Hazard Planning Considerations: S - Significant Risk M - Moderate Risk L - Limited Risk 19 - 110
August 2023 95

CITY OF SOUTH PASADENA

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR

4.9.3 FACILITIES MOST AT RISK
Table 25 - Facilities Most at Risk
Facility Earthquake
Severe
Storms and
Localized
Flooding
Landslides and
Mudflow
Wildland and
Urban Fire
Hazmat and
Human
Caused
Windstorms Drought Reservoir
Failure
War Memorial S S M L L
Library S S L L L
San Pasqual Stables S M M L L L L L
Arroyo Seco
Racquet Club S M L L M L L L
Arroyo Seco
Golf Course M M L L M L L L
Orange Grove
Recreation S L M L L
Bilicke Tank S L L L L L L
Kolle
Interconnection S L L L L L L
Indiana
Pump Station S L L L L L L
Hazard Planning Considerations: S - Significant Risk M - Moderate Risk L - Limited Risk 19 - 111
August 2023 96

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR

4.9.4 POTENTIAL LOSSES
Table 26 - Costliest Critical Facilitiesidentifies the critical facilities in the city with the highest replacement value (combination of building replacement and contents value). Should these facilities be destroyed by a hazard event, their replacement will be more costly than other identified critical facilities.

Table 26 - Costliest Critical Facilities
Facility Replacement Value
Library and Community Room $168,916,846
Police and Fire Department $60,000,000
San Pasqual Stables $49,842,804
City Hall and Council Chambers $40,000,000
War Memorial $38,468,046

4.10 History of Federally Declared Disasters
In order to put perspective into the hazards associated with each of the City’s facilities and the potential for economic losses, the following table indicates federally declared disasters in the State of California since 1980.

Table 27 - List of Federally Declared Disasters in California from 1980 to 2022 ID # Date Description
4619 8/14/2021 Caldor Fire
4610 7/14/2021 California Wildfires
4569 10/16/2020 California Wildfires
4558 8/22/2020 Northern California Lightning Fires
5280 11/8/2018 Hill and Woolsey Fires
4407 11/8/2018 Camp Fire
5259 8/2/2018 Carr Fire
4353 1/2/2018 Santa Barbara and Ventura County Mudslides 5228 12/7/2017 Lilac Fire
5225 12/5/2017 Creek and Rye Fires
4396 12/8/2017 Thomas Wildfire
4344 10/9/2017 Sonoma and Napa Wildfires
4305 03/16/2017 Severe Winter Storms, Flooding, and Mudslides 4301 02/14/2017 Severe Winter Storms, Flooding, and Mudslides 19 - 112
August 2023 97

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 27 - List of Federally Declared Disasters in California from 1980 to 2021 (Continued) ID # Date Description
4193 09/11/2014 Earthquake
4158 12/13/2013 Rim Fire
1968 04/18/2011 Tsunami Waves
1952 01/26/2011 Winter Storms, Flooding, and Debris and Mud Flows 1911 05/07/2010 Earthquake
1884 03/08/2010 Severe Winter Storms, Flooding, Debris & Mud Flows 1810 11/18/2008 Wildfires
1731 10/24/2007 Wildfires
1689 03/13/2007 Severe Freeze
1646 06/05/2006 Severe Storms, Flooding, Landslides, and Mudslides 1628 02/03/2006 Severe Storms, Flooding, Mudslides, and Landslides 1585 04/14/2005 Severe Storms, Flooding, Landslides, Mud & Debris Flows 1577 02/04/2005 Severe Storms, Flooding, Debris Flows, and Mudslides 1529 06/30/2004 Flooding As A Result Of a Levee Break
1505 01/13/2004 Earthquake
1498 10/27/2003 Wildfires
1342 09/14/2000 Earthquake
1267 02/09/1999 Severe Freeze
1203 02/09/1998 Severe Winter Storms and Flooding
1155 01/04/1997 Severe Storms/Flooding
1046 03/12/1995 Severe Winter Storms, Flooding, Landslides, Mud Flows 1044 01/10/1995 Severe Winter Storms, Flooding, Landslides, Mud Flows 1038 09/13/1994 El Nino Effect (The Salmon Industry)
1008 01/17/1994 Northridge Earthquake
1005 10/28/1993 Fires, Mud & Landslides, Soil Erosion, Flooding 979 02/03/1993 Severe Storm, Winter Storm, Mud & Landslides, Flooding 958 08/29/1992 Old Gulch, Fountain Fires
947 07/02/1992 Earthquake, Aftershocks
943 05/04/1992 Earthquake, Aftershocks
19 - 113
August 2023 98

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FOUR
Table 27 - List of Federally Declared Disasters in California from 1980 to 2021 (Continued) ID # Date Description
942 05/02/1992 Fire during a Period of Civil Unrest
935 02/25/1992 Snow Storms, Heavy Rain, High Winds, Flooding, Mudslides
919 10/22/1991 Oakland Hills Fire
894 02/11/1991 Severe Freeze
872 06/30/1990 Fires
845 10/18/1989 Loma Prieta Earthquake
815 09/29/1988 Wildfires
812 02/05/1988 Severe Storms, High Tides, Flooding
799 10/07/1987 Earthquake, Aftershocks
758 02/21/1986 Severe Storms, Flooding
739 07/18/1985 Grass, Wildlands, Forest Fires
690 09/22/1983 Flash Flooding
687 07/01/1983 Flooding
682 05/05/1983 Coalinga Earthquake
677 02/09/1983 Coastal Storms, Flooding, Slides, Tornadoes 669 09/24/1982 Levee Break
657 04/24/1982 Urban Fire
651 01/07/1982 Severe Storms, Flooding, Mudslides, High Tide 635 11/27/1980 Brush, Timber Fires
633 10/02/1980 Levee Break and Flooding
615 02/21/1980 Severe Storms, Flooding, Mudslides, Flooding 19 - 114
August 2023 99

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FIVE
Section Five - Hazard Mitigation Actions

5.1 Hazard Mitigation Overview

5.1.1 HAZARD MITIGATION GOALS
The plan goals, presented in the Mitigation Priorities and Goals section of Chapter 1, serve as a basis for promoting sound public policy designed to protect critical facilities, infrastructure, and the environment from hazards. In addition, the Plan goals guide the direction of future activities aimed at reducing risk and preventing loss from natural hazards. The goals also serve as checkpoints as agencies and organizations implement mitigation action items. Refer to Section 1.6.

The hazard mitigation actions identified below list activities the City will utilize to reduce its risk of potential hazards. These mitigation actions were identified through the planning process with the Technical Advisory Committee and public input. The TAC determined that since the last LHMP was approved in 2019, there have been no changes in within the city that would affect hazard mitigation priorities. Some of these actions may be eligible for funding through Federal and State grant programs and other funding sources made available to the City. The mitigation actions are intended to address the comprehensive range of identified hazards. Some actions may address risk reduction from multiple hazards.

5.1.2 HAZARD MITIGATION PRIORITIZATION
The TAC used the STAPLE/E (Social, Technical, Administrative, Political, Legal, Economic, and Environmental) criteria through discussion and analysis, as described in Table 28 - STAPLE/E Review and Selection Criteria. This methodology (as endorsed by FEMA) requires that social, technical, administrative, political, legal, economic, and environmental considerations be considered when reviewing potential actions to undertake. This process was used to help ensure that the most equitable and feasible actions would be undertaken based on the City's capabilities. .
19 - 115
August 2023 100

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FIVE
Table 28 - STAPLE-E Review and Section Criteria
Social
• Is the proposed action socially acceptable to the jurisdiction and surrounding community? • Are there equity issues involved that would mean that one segment of the jurisdiction and/or community is treated unfairly?
• Will the action cause socialdisruption?
Technical
• Will the proposed action work?
• Will it create more problems than itsolves?
• Does it solve a problem or only a symptom?
• Is it the most useful action in light of other jurisdiction goals? Administrative
• Can the jurisdiction implement theaction?
• Is there someone to coordinate and lead theeffort?
• Is there sufficient funding, staff, and technical support available? • Are there ongoing administrative requirements that need to be met? Political
• Is the action politically acceptable?
• Is there public support both to implement and maintain the project? Legal
• Is the jurisdiction authorized to implement the proposed action? • Are there legal side effects? Could the activity be construed as a taking? • Will the jurisdiction be liable for action or lack ofaction? • Will the activity be challenged?
Economic
• What are the costs and benefits of thisaction?
• Do the benefits exceed the costs?
• Are initial, maintenance, and administrative costs taken into account? • Has funding been secured for the proposedaction?
What are the potential funding sources (public, non-profit, and private) if not? • How will this action affect the fiscal capability of thejurisdiction? • What burden will this action place on the tax base or local economy? • What are the budget and revenue effects of thisactivity? • Does the action contribute to other jurisdictiongoals? • What benefits will the actionprovide?
Environmental
• How will the action affect theenvironment?
• Will the action need environmental regulatoryapprovals? • Will it meet local and state regulatoryrequirements?
• Are endangered or threatened species likely to beaffected? 19 - 116
August 2023 101

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FIVE

5.1.3 HAZARD MITIGATION BENEFIT-COST REVIEW
A cost-benefit review was applied to prioritize the mitigation recommendations for implementation. The priority for implementing mitigation recommendations depends upon the recommendation's overall feasibility when considering monetary and non-monetary costs and benefits associated with each action.

The cost-benefit table for each hazard analyzesthe benefit, cost, and relative priority rank (High, Medium, and Low) for each mitigation activity. The general guidelines are listed below. • High - Benefits are perceived to exceed costs without further study or evaluation. • Medium - Benefits are perceived to exceed costs but may require further study or evaluation before implementation.
• Low - Benefits and the associated costs require an additional evaluation prior to implementation.

Projects identified in this LHMP receiving funding, either from City resources or grant opportunities, shall be cost-effective and assist in efforts to help the City to mitigate or recover from disasters. Some of the projects identified are already funded through existing mechanisms, while others await evaluating and identifying potential funding sources. Most of the projects are ongoing to ensure mitigation measures are implemented within the City. It is not anticipated that all future projects will be identified in this LHMP. The LHMP will help guide the City to prioritize, be flexible, and identify critical mitigation strategy needs that may arise from a disaster when there is no time to update the local plan.

It is also essential for the City to protect critical facilities and infrastructure. South Pasadena has a Capital Improvement Program in place (Table 34) and is actively working to protect facilities and infrastructure critical to the city.

Mitigation Funding Strategy
South Pasadena intends to fund mitigation activities deemed feasible to accomplish with a combination of City budget funds and Federal and/or state grant funds when available. These funds could be from a variety of sources, including FEMA Pre-Disaster Mitigation Grant Funding (PDM), FEMA Hazard Mitigation Grant Program (HMGP) funding, and Emergency Management Performance Grant (EMPG) program funds.

Refer to Table 36.

These grants will be investigated, and the City will apply for funding once a project has been identified as viable or, during the investigative phase, if funding is available to assist with those associated costs. In addition, the TAC will facilitate and monitor grant funding opportunities as they arise and report on grant application outcomes as part of the annual reporting required under the LHMP.

5.2 Review of Previous Mitigation Actions from the 2019 LHMP Refer to Table 29 - 2019 South Pasadena Hazard Mitigation Actions and Current Status. 19 - 117
August 2023 102

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FIVE

5.3 Current Hazard Mitigation Actions
The process used by the Technical Advisory Committee to identify hazard mitigation actions for this Plan included reviewing the City’s hazard assessment presented in Section Four and discussing concerns and issues to reduce hazards to critical facilities and infrastructure.

Multi-hazard action items are those activities that pertain to two or more of the nine hazards in the mitigation plan: Drought, Earthquake, Hazardous Materials, Landslide and Mudflow, Severe Storms and Localized Flooding, Water Resource, Wildland Fire, and Windstorm.

Refer to Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions. 19 - 118
August 2023 103

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 29 - 2019 South Pasadena Hazard Mitigation Actions and Current Status 2019 Mitigation Action Responsible Department Mitigation Status Update

1. Earthquake Hazard Related Actions
A. Require a full site-specific geologic study of any hillside site within the purview of the hillside ordinance. The study shall adequately address site-specific questions such as slope stability, erosion, subsidence, groundwater effects and earthquakes.

Planning and Building
Department
These studies continue to be required for all hillside
development within the city.

B. Continue to review the Regional Earthquake
Transportation Evacuation Routes and make any required
updates to the appropriate documents, such as the City’s Emergency Operations Plan.

Police Department, Fire
Department
These continue to be reviewed by the City’s Police and
Fire Departments
C. Continue to support the City’s Community Emergency
Response Team (CERT) of volunteers that have completed
the recognized training course to ensure that in the event of a major disaster neighbors will be trained to help with immediate life-saving and life sustaining needs.

Police Department, Fire
Department
The CERT volunteers continue to assist in preparation of disaster events and are an integral part of the City’s
emergency response program.

D. Identification of funding sources for retrofitting seismically vulnerable structures, identification of at-risk structures and infrastructure in the city, and reductions of hazards in structures through educational awareness programs.

Planning and Building
Department, Public Works
Department
This continues to be an on-going effort for the Planning and Building Department and the Public Works
Department.

E. During storm periods, monitor catch basins to ensure that they are kept clear of debris to maintain optimal
conditions in the event of heavy rainfall.

Public Works Department This continues to be an on-going effort by the Public Works Department.
19 - 119
August 2023 104

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 29 - 2019 South Pasadena Hazard Mitigation Actions and Current Status (Continued) 2019 Mitigation Action Responsible Department Mitigation Status Update

2. Flooding Hazard Related Actions
A. Review and update the City’s existing ordinances as they relate to storm / flooding hazards, consistent with the risks identified in this LHMP.

Planning and Building
Department
This continues to be an on-going effort for the Planning and Building Department.

B. Monitor and review California State Water Resources
Control Board regulations and permit requirements to
ensure consistency with City policies and regulations. This includes on-site retention of storm water runoff from
impervious surfaces and the implementation of Low Impact Development (LIDs) standards on new development.

Planning and Building
Department, Public Works
Department
This continues to be an on-going effort for the Planning and Building Department and the Public Works
Department.

C. In coordination with the Los Angeles County Flood Control District, evaluate the effectiveness of current policies and ordinances to ensure that storm water runoff from
impervious surfaces does not contribute to flooding.

Planning and Building
Department, Public Works
Department
This continues to be an on-going effort for the Planning and Building Department and the Public Works
Department.
19 - 120
August 2023 105

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 29 - 2019 South Pasadena Hazard Mitigation Actions and Current Status (Continued) 2019 Mitigation Action Responsible Department Mitigation Status Update

3. Landslide Hazard Related Actions
A. Improve knowledge of landslide hazard areas and
understanding of vulnerability and risk to life and property in these areas by updating landslide mapping data in
appropriate City plans and documents.

Planning and Building
Department, Public Works
Department
This continues to be an on-going effort for the Planning and Building Department and the Public Works
Department.

B. Continue to require that geologic/engineering reports be prepared for any proposed construction near landsliding and require mitigation of landslide hazards before issuing any building or grading permits.

Planning and Building
Department, Public Works
Department
This continues to be an on-going effort for the Planning and Building Department and the Public Works
Department.

C. Identify safe evacuation routes in debris flow and landside areas by identifying debris removal resources and in
conjunction with the County’s Debris Removal Plan.

Planning and Building
Department, Public Works
Department
This continues to be an on-going effort for the Planning and Building Department and the Public Works
Department.
19 - 121
August 2023 106

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 29 - 2019 South Pasadena Hazard Mitigation Actions and Current Status (Continued) 2019 Mitigation Action Responsible Department Mitigation Status Update

4. Wildfire Hazard Related Actions
A. Continue to secure adequate equipment and attract and retain personnel while collaborating with neighboring
jurisdiction and partner agencies to adequately respond to emergencies and incidents in all parts of the city.

Fire Department This continues to be an on-going effort for the Fire Department.

B. Work cooperatively with other relevant agencies to
promote the implementation and awareness of fire
prevention programs.

Fire Department This continues to be an on-going effort for the Fire Department.

C. Require adequate fire flow and emergency access as a condition of approval for discretionary entitlements within Hillside areas.

Planning and Building
Department, Fire Department
This continues to be an on-going effort for the Planning and Building Department and the Fire Department.

D. Work with residents to promote fire mitigation and water conservation measures related to drought stress issues.

Planning and Building
Department, Fire Department
This continues to be an on-going effort for the Planning and Building Department and the Fire Department.

E. Require fire-resistant building materials for all structures in hillside areas and encourage use of fire-resistant
landscaping.

Planning and Building
Department, Fire Department
This continues to be an on-going effort for the Planning and Building Department and the Fire Department.
19 - 122
August 2023 107

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 29 - 2019 South Pasadena Hazard Mitigation Actions and Current Status (Continued) 2019 Mitigation Action Responsible Department Mitigation Status Update

5. Human Caused (Hazardous Materials) Related Actions
A. Enhance the response capabilities of firefighters, police officers, and Public Works field personnel through
ongoing training on event specific (human caused)
incidents.

Fire Department, Police
Department, Public Works
Department
Ongoing training for emergency response is built into each of the Department’s yearly training plans.

B. Continue to enhance public safety communications
through upgrades and interoperable technologies.

Fire Department, Police
Department, Public Works
Department
The Police and Fire Departments are continuing the
process of updating their communications systems.

C. Coordinate with the Los Angeles County Department of Environmental Health Services on enforcement of State
and local statutes and regulations pertaining to hazardous materials/waste storage, use, and disposal.

Planning and Building
Department, Fire Department This coordination is ongoing between the agencies. 2019 Mitigation Action Responsible Department Mitigation Status Update

6. Windstorm Hazard RelatedActions
A. Create local city awareness of tree pruning and Fire Code sections relevant to wind-resistant utility operations by providing information to residents, utility companies, and other involved agencies.

Public Works, Building,
Community and Economic
Development, Fire
This continues to be an on-going effort between all the Departments involved.

B. Encourage critical facilities (public and private)
throughout the city to purchase and/or test backup
generators during power failure by providing information guidance.

Fire Department, Police
Department, Public Works
Department
This continues to be an on-going effort between all the Departments involved.
19 - 123
August 2023 108

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 29 - 2019 South Pasadena Hazard Mitigation Actions and Current Status (Continued) 2019 Mitigation Action Responsible Department Mitigation Status Update

6. Windstorm Hazard RelatedActions
C. Create local city awareness of tree pruning and Fire Code sections relevant to wind-resistant utility operations by providing information to residents, utility companies, and other involved agencies.

Public Works, Building,
Community and Economic
Development, Fire
This continues to be an on-going effort between all the Departments involved.

D. Encourage critical facilities (public and private)
throughout the city to purchase and/or test backup
generators during power failure by providing information guidance.

Fire Department, Police
Department, Public Works
Department
This continues to be an on-going effort between all the Departments involved.
2019 Mitigation Action Responsible Department Mitigation Status Update

7. Drought Hazard Related Actions
A. Continue to work with other government and other
involved agencies to implement water conservation
strategies that maximize the use of existing water
resources.

City Manager, Planning and
Building Department, Public
Works Department
This continues to be an on-going effort between all the Departments involved.

B. Work in coordination with the Upper San Gabriel Water District to promote increased groundwater recharge and
conjunctive use.

Public Works Department Public Works staff regularly meet with Water District officials on groundwater recharge issues.

C. Coordinate with the all-water distribution partners on water conservation restrictions and drought conditions. Public Works Department This continues to be an on-going effort between all the agencies involved.
19 - 124
August 2023 109

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 29 - 2019 South Pasadena Hazard Mitigation Actions and Current Status (Continued) 2019 Mitigation Action Responsible Department Mitigation Status Update

8. Reservoir Failure Hazard Related Actions
A. Monitor the Los Angeles County Flood Control District’s project that will restore reservoir capacity to address the post‐Station Fire sediment impacts at Devil’s Gate Dam.

Public Works Department This project has been completed.

B. Monitor the Los Angeles County Flood Control District’s project to establish a reservoir configuration that will be more suitable for future routine maintenance activities including sediment management. This will enable the
timely removal of sediment in locations, such as those near the dam’s valves that are critical to dam safety.

Public Works Department This project has been completed. 19 - 125
August 2023 110

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

1. Multi-Hazard Related Actions
A. Increase the ability of
the city government to
serve the community
during and after hazard
events.

Update Crisis
Communication
Systems
Promote crisis communication by
implementing a Wireless Emergency
Alerting (WEA) system.

Grant Funding Medium June 30, 2024 Police Chief,
Fire Chief
B. Increase the ability of
the city government to
serve the community
during and after hazard
events.

Emergency
Operations Center
Enhancement
Obtain Planet Bid for establishing
contracts with vendors during a
disaster.

General Fund Medium June 30, 2024 Fire Division
Chief
C. Increase the ability of
the city government to
serve the community
during and after hazard
events.

Emergency
Operations Center
Enhancement
Initiate regular Emergency Operations
Center (EOC) training for Department
Directors and staff.

General Fund Medium June 30, 2024 Fire Division
Chief
D. Increase the ability of
the city government to
serve the community
during and after hazard
events.

Coordinate City
Planning Efforts
Integrate the City's Mitigation Plan
into current capital improvement
plans to ensure that development
plans include specific strategies for
mitigation requirements.

Staff Budget Medium June 30, 2026
Community
Development
Director
E. Encourage mitigation
activities to increase the
disaster resilience of the
City, institutions, private
companies, and systems
essential to the City.

Pursuit of Additional
Mitigation Funding
Identify and pursue funding
opportunities to develop and
implement local and city mitigation
activities.

Staff Budget Medium June 30, 2026 Fire Division
Chief
19 - 126
August 2023 111

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

1. Multi-Hazard Related Actions
F. Increase the ability of
the City government to
serve the community
during and after hazard
events.

Enhance Emergency
Communications
Replacement of the Fire and Police
Department’s Communications Tower Grant Funding Medium June 30, 2027 Fire Chief, Police Chief
19 - 127
August 2023 112

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

2. Earthquake-Related Actions
A. Encourage mitigation
activities to increase the
disaster resilience of the
City, institutions, private
companies, and systems
essential to a functioning
City of South Pasadena.

Review Seismic
Regulations
Complete an inventory of soft-story
buildings in preparation for
consideration of future regulations.

General Fund Medium January 31, 2024
Community
Development
Director
B. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South
Pasadena residents from
earthquakes, floods,
drought, landslides, and
other geological hazards.

Facilities
Assessment
Conduct an assessment of City
facilities to determine upgrade costs
for municipal buildings.

CIP Medium June 30, 2027 Public Works
Director
C. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South
Pasadena residents from
earthquakes, floods,
drought, landslides, and
other geological hazards.

Fire Station Upgrade
Replace the Fire Station Bay
apparatus doors to ensure operation
following a severe seismic event
CIP High January 31, 2024 Fire Division
Chief
19 - 128
August 2023 113

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)
D. Increase the ability of
the City government
to serve the
community during
and after hazard
events.

Ongoing Support of
the City’s CERT
Program
Continue to support the City’s
Community Emergency Response
Team (CERT) of volunteers
Staff Budget,
General Fund Medium June 30, 2026 Fire Chief
19 - 129
August 2023 114

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

3. Severe Storms and Localized Flooding Related Actions A. Encourage mitigation
activities to increase the
disaster resilience of the
City, institutions, private
companies, and systems
essential to a functioning
City of South Pasadena.

Mitigating Climate
Change
Complete the City’s Climate Action
Plan to lessen to assist in mitigating
the effects of Severe Storms.

General Fund Medium June 30, 2027 Public Works
Director
B. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South
Pasadena residents from
earthquakes, floods,
drought, landslides, and
other geological hazards.

Support of
Infrastructure
Enhancements
Complete the Lower Arroyo Seco
Stormwater Mitigation Projects CIP Medium June 30, 2027 Public Works Director
C. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South
Pasadena residents from
earthquakes, floods,
drought, landslides, and
other geological hazards.

Support of
Infrastructure
Enhancements
Complete the Huntington Drive and
Green Street Stormwater Mitigation
Project.

CIP Medium June 30, 2026 Public Works
Director
19 - 130
August 2023 115

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

3. Severe Storms and Localized Flooding Related Actions D. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South
Pasadena residents from
earthquakes, floods,
drought, landslides, and
other geological hazards.

Support of
Infrastructure
Enhancements
Complete the Rio Honda Load
Reduction Project CIP Medium June 30, 2024 Public Works Director
19 - 131
August 2023 116

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

4. Landslide and Mudflow-Related Actions
A. Encourage mitigation
activities to increase the
disaster resilience of the
City, institutions, private
companies, and systems
essential to a functioning
City of South Pasadena.

Monitoring of
Landslide Planning
Continue to require that
geologic/engineering reports be
prepared for any proposed
construction near landsliding and
require mitigation of landslide
hazards before issuing any building or
grading permits.

Staff Budget Medium June 30, 2026
Community
Development
Director
B. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South Pasadena
residents from earthquakes,
floods, drought, landslides,
and other geological
hazards.

Monitoring of
Landslide Planning
Identify safe evacuation routes in
debris flow and landside areas by
identifying debris removal resources
in conjunction with the County’s
Debris Removal Plan.

Staff Budget Medium June 30, 2026 Public Works
Director
19 - 132
August 2023 117

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

5. Wildland and Urban Fire Related Actions
A. Encourage mitigation
activities to increase the
disaster resilience of
institutions, private
companies, and systems
essential to a functioning
City of South Pasadena.

Wildland Fire
Prevention
Research alternative methods of
controlling/mitigating hazardous
vegetation in the City’s high-hazard
brush area.

Staff Budget Medium June 30, 2025 Fire Chief
B. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South Pasadena
residents from earthquakes,
floods, drought, landslides,
and other geological
hazards.

Wildland Fire
Prevention
Work with SGVCOG and apply for
grants on wildfire mitigation on cityowned vacant lots.Staff Budget Medium January 31, 2024 Fire Chief C. Encourage mitigation
activities to increase the
disaster resilience of the
City, institutions, private
companies, and systems
essential to a functioning
City of South Pasadena.

Wildland Fire
Prevention
Work cooperatively with other
agencies to promote the
implementation and awareness of fire
prevention programs.

Staff Budget Low June 30, 2027 Fire Chief
19 - 133
August 2023 118

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

5. Wildland and Urban Fire Related Actions
D. Encourage mitigation
activities to increase the
disaster resilience of the
City, institutions, private
companies, and systems
essential to a functioning
City of South Pasadena.

Wildland Fire
Prevention
Work with residents to promote fire
mitigation and water conservation
measures related to drought stress
issues.

Staff Budget Medium June 30, 2025 Fire Chief
19 - 134
August 2023 119

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

6. Hazardous Materials and Human Caused Related Actions A. Increase the ability of
the City government to
serve the community
during and after hazard
events.

Improve Hazmat
Response Training
Continue the enhancement of
response capabilities of firefighters,
police officers, and Public Works field
personnel through ongoing training
on event-specific (human-caused)
incidents.

Staff Budget,
General Fund,
CalOES Grants
Medium June 30, 2026
Fire Chief,
Police Chief,
Public Works
Director
B. Increase the ability of
the City government to
serve the community
during and after hazard
events.

Review Public Safety
Communications
Systems
Continue to enhance public safety
communications through upgrades
and interoperable technologies.

CIP, Grant
Funding Medium June 30, 2027 Police Chief,
Fire Chief
19 - 135
August 2023 120

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

7. Windstorm-Related Actions
A. Encourage mitigation
activities to increase the
disaster resilience of the
City, institutions, private
companies, and systems
essential to a functioning
City of South Pasadena.

Provide Information
on Power Loss
Issues to the
Community
Encourage critical facilities (public and
private) throughout the city to
purchase and test backup generators
during power failure by providing
information guidance.

Staff Budget Medium June 30, 2026 Fire Chief
B. Encourage mitigation
activities to increase the
disaster resilience of the
City, institutions, private
companies, and systems
essential to a functioning
City of South Pasadena.

Distribution of
Public Information
to deal with Wind
Related
Emergencies
Continue local awareness of tree
pruning and Fire Code sections
relevant to wind-resistant utility
operations by providing information
to residents, utility companies, and
other involved agencies.

Staff Budget Medium June 20, 2026 Fire Chief
19 - 136
August 2023 121

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

8. Drought and Water Resource Related Actions
A. Increase the ability of
the City government to
serve the community
during and after hazard
events.

Ensure Water
Resource
Sustainability
Implement Integrated Water
Resources Plan to address ongoing
aging infrastructure challenges,
operational and supply sources, and
financial strategies for a droughtproof City.

General Fund Medium June 30, 2027 Public Works
Director
B. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South
Pasadena residents from
earthquakes, floods,
drought, landslides, and
other geological hazards.

Ensure Water
Resource
Sustainability
Complete the Westside Reservoir
redesign and construction project. CIP Medium June 30, 2027 Public Works Director
C. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South
Pasadena residents from
earthquakes, floods,
drought, landslides, and
other geological hazards.

Ensure Water
Resource
Sustainability
Complete the Raymond and Bilikie
tanks improvement project. CIP Medium January 31, 2024 Public Works Director
19 - 137
August 2023 122

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

8. Drought and Water Resource Related Actions
D. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South
Pasadena residents from
earthquakes, floods,
drought, landslides, and
other geological hazards.

Ensure Water
Resource
Sustainability
Complete the SCADA update project CIP Medium June 30, 2027 Public Works Director
19 - 138
August 2023 123

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 30 - City of South Pasadena 2023 Hazard Mitigation Actions (Continued) Goal Objective Mitigation Action
Potential
Funding
Sources
(Tables 35 & 36)
Priority
Target
Completion
Date
Staff
Assigned
Table (33)

9. Reservoir Failure-Related Actions
A. Avoid or reduce the
potential for loss of life,
injury, and economic
damage to South
Pasadena residents from
earthquakes, floods,
drought, landslides, and
other geological hazards.

Ongoing Monitoring
of Reservoir
Flooding Issues
Monitor the Los Angeles County Flood
Control District’s project to establish a
reservoir configuration that will be
more suitable for future routine
maintenance activities, including
sediment management. This will
enable the timely removal of
sediment in locations, such as those
near the dam’s valves, critical to dam
safety.

Staff Budget Low June 30, 2027 Public Works
Director
19 - 139
August 2023 124

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE

5.4 Planning and Regulatory Capabilities Assessment
This capability assessment is designed to identify existing local agencies, personnel, planning tools, public policy and programs, technology, and funds to support hazard mitigation activities and strategies outlined in this LHMP. To create this capability assessment, the Technical Advisory Committee collaborated to identify current local capabilities and mechanisms available to the City for reducing damage from future natural hazard events. These plans and resources were reviewed while developing the Local Hazard Mitigation Plan and summarized below.

Key Resources
The City of South Pasadena has departments with resources to support mitigation actions. These departments offer various planning, technical, policy, and staffing resources, summarized below.

Table 31 - City of South Pasadena Planning Capabilities Assessment Type of
Resource Resource Name Ability to Support Mitigation Web Address (URL) Planning Department
Personnel
Resource
Community
Development
Department
The Planning & Building Department provides staff
services to the Planning and Cultural Heritage
Commissions and the Design Review Board. The
planning staff administers land use and development
regulations, processes land use permits, and does
long-range land use planning. In addition, the
Department is responsible for the planning and
development review of the built environment in
South Pasadena.
https://www.southpasadenaca.gov/government/departments/planningand-building/www.ci.south-pasadena.ca.us/index.aspx?page=118 Policy Resource Zoning Ordinance
The Zoning Ordinance is the primary tool to
implement the City’s General Plan. It sets land use
regulations and the zoning map for the city.

Mitigation actions outlined in this Plan can be
adopted as land use/development regulations.
http://www.codepublishing.com/CA/SouthPasadena/#!/South Pasadena36/SouthPasadena36.html
19 - 140
August 2023 125

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 31 - City of South Pasadena Planning Capabilities Assessment (Continued) Type of
Resource Resource Name Ability to Support Mitigation Web Address (URL) Building Department
Personnel
Resource Building Official The role of the Building Division is to enforce the provisions of the Building Code. http://www.southpasadenaca.gov/index.aspx?page=119 Policy Resource Inspections &
Permit
Building permits ensure that zoning requirements, as
well as fire and structural safety standards, are met.
https://www.southpasadenaca.gov/government/departments/pl anning-and-building/building-division
City Council
Policy Resource Policy Approval Policy legislation and implementation http://www.southpasadenaca.gov/index.aspx?page=14 1 City Administration
Personnel
Resource City Manager
Supports the development and implementation of
this Local Hazard Mitigation Plan by allocating the
appropriate personnel and resources.
https://www.southpasadenaca.gov/government/departments/ city-manager-s
Financial
Resource Finance Budgeting and Risk Management for City owned facilities. http://www.southpasadenaca.gov/index.aspx?page=108 Public Works Department
Personnel
Resource
Public Works
Director
Participates in the development and implementation
of this Hazard Mitigation Plan. http://www.southpasadenaca.gov/index.aspx?page=134 Technical and
Policy Resource Maintenance Provides maintenance and improvement of the city’s streets, facilities, stormwater, and parks. http://www.southpasadenaca.gov/index.aspx?page=354 Personnel
Resource Engineering
Engineering activities include the programming,
design, and construction of the City's capital
projects.
http://www.southpasadenaca.gov/index.aspx?page=134
19 - 141
August 2023 126

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 31 - City of South Pasadena Planning Capabilities Assessment (Continued) Type of
Resource Resource Name Ability to Support Mitigation Web Address (URL) Police Department
Personnel
Resource Police Chief Provides law enforcement services for the City of South Pasadena.
https://www.southpasadenaca.gov/government/departments/ police
Fire Department
Personnel
Resource Fire Chief
Coordinates emergency response, fire prevention
education, CERT training, and wildfire education and
prevention.
https://www.southpasadenaca.gov/government/departments/ fire/administration
Plan Resource Hazardous Waste Dealing with hazardous waste materials within the city.
https://www.southpasadenaca.gov/government/departments/ fire/hazardous-waste
Personnel
Resource
Operations
Division
Is charged with the responsibility of providing fast
and efficient emergency response to fires, hazardous
conditions, rescues, illnesses, or any other conditions where the health, safety, and welfare of the public is
in jeopardy.
https://www.southpasadenaca.gov/government/departments/f ire/operations
Personnel
Resource
Emergency
Services
Coordinates with City staff on emergency
preparedness, response, and mitigation activities.
https://www.southpasadenaca.gov/residents/disasterpreparedness Personnel
Resource Public Education Educates residents on hazard awareness, prevention, and preparedness.
https://www.southpasadenaca.gov/government/departments
/fire/fire-prevention
Policy Resource
Building
Inspections and
Permits
Provides reoccurring fire prevention inspections of
all buildings in the city. The Department also
provides plan check and permit functions for
commercial development addressing Fire Code
Standards.
https://www.southpasadenaca.gov/government/departments/ fire/fire-prevention
19 - 142
August 2023 127

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 32 - Outside Agency Capabilities
Type of
Resource Resource Name Ability to Support Mitigation Web Address (URL) Outside Agencies Within Los Angeles County
Upper San Gabriel Valley Municipal Water District
Plan Resource Water Provider Water supply planning. http://upperdistrict.org/ Metropolitan Water District
Plan Resource Water Provider Wholesale water provider for the Southern California region. http://www.mwdh2o.com/
Los Angeles County Flood Control District
Technical
Resource Flood Control Organization charged with coordinating flood control issues in Los Angeles County. http://ladpw.org/LACFCD/index.cfm Sanitation Districts of Los Angeles County
Technical
Resource
Wastewater
Collection and
Treatment
The Sanitation Districts provide wastewater and solid
waste management for over half the population of
Los Angeles County.
https://dpw.lacounty.gov/landing/wr/sewer/wwTreatment.cfm Los Angeles County Office of Emergency Management
Plan Resource
Operational Area
Emergency
Management Plan
Overall emergency management plan for the Los
Angeles County Operational Area. https://ceo.lacounty.gov/emergency-management/ Southern California Earthquake Center
Technical
Resource
Earthquake
Planning
Regional Earthquake planning and technical resource
organization. https://www.scec.org/
19 - 143
August 2023 128

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 32 - Outside Agency Capabilities (Continued)
Type of
Resource Resource Name Ability to Support Mitigation Web Address (URL) State Agencies
California Office of Emergency Services (CalOES)
Plan Resource Planning
Organization
State of California’s emergency management
agency. Assists with mitigation plans and training. http://www.caloes.ca.gov/home California Department of Transportation (CalTrans)
Technical
Resource
Transportation
Agency
State of California’s transportation agency. Assists
with emergency management plans. http://www.dot.ca.gov/ California Department of Forestry and Protection (CalFire) Technical
Resource
Fire Protection
Agency
The California Department of Forestry and Fire
Protection protects over 31 million acres of
California's privately-owned wildlands.
http://www.fire.ca.gov/
California Department of Water Resources Control Board (DWRCB) Technical
Resource
Water Regulatory
Agency
The Department of Water Resources manages
California's water resourcesin cooperation with other
agencies.
http://www.water.ca.gov/
California Department of Conservation
Technical
Resource
Conservation
Agency
Provides services and information that promote
environmental health, economic vitality, informed
land-use decisions, and sound management of our
state's natural resources.
http://www.conservation.ca.gov/
19 - 144
August 2023 129

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 32 - Outside Agency Capabilities (Continued)
Type of
Resource Resource Name Ability to Support Mitigation Web Address (URL) Federal Agencies
Federal Emergency Management Agency Region IX (FEMA)
Plan Resource Planning
Organization
Responsible for the federal government’s response
to disasters.
https://www.fema.gov/fema-region-ix-arizona-california-hawaii-nevada-pacificislands Federal Emergency Management Agency Mitigation Division (FEMA) Plan Resource Planning
Organization
FEMA’s division that assists with mitigation plans and
training. https://www.fema.gov/hazard-mitigation-assistance United States Geological Survey (USGS)
Technical
Resource
Geological
Agency
The Agency provides reliable scientific information to
describe and understand the Earth and to minimize
the loss of life and property from natural disasters.
https://www.usgs.gov/
National Weather Service (NWS)
Technical
Resource
Weather
Agency
It is responsible for observing and reporting the
weather and issuing forecasts and warnings of
weather and floods in the interest of national safety
and the economy.
http://www.weather.gov/
US Army Corps of Engineers (USACE)
Technical
Resource
Engineering
Agency
Although generally associated with dams, canals, and
flood protection in the United States, USACE is
involved in many public works projects worldwide.
http://www.usace.army.mil/
19 - 145
August 2023 130

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
This Page Intentionally Left Blank
19 - 146
August 2023 131

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FIVE

5.5 Organizational Capabilities Assessment
The following summarizes the City of South Pasadena’s organizational capabilities in terms of the City's resources and allocated spending. The General Fund and Enterprise accounts are the primary sources of the City’s financial resources. The City has allocated most of these financial resources to the City departments listed in the table below. These departments are all relevant for implementing hazard mitigation actions. The functions of City departments include:

Table 33 - City of South Pasadena Department Responsibilities Department Responsibilities
City Manager
The Council appoints the City Manager to oversee the activities of the City. The City Manager serves as the Chief Administrative Officer, ensuring that the policies of the Mayor and City Council are executed effectively and efficiently.

Specific areas of responsibility include oversight of eight operating departments, public information and community engagement, legislative affairs, economic development, following up on citizen concerns, providing recommendations to promote organizational efficiency, and overseeing the development and presentation of the annual budget.

City Clerk
The City Clerk’s Office conducts municipal elections, coordinates City Council meetings and agendas, is the custodian of City public records, maintains the City’s Municipal Code, and coordinates the recruitment process for the City’s advisory committees.

Human Resources
Division
The Human Resources Office is a Division of the Management Services Department, dedicated to responsible human resource management by recruiting qualified individuals for a productive workplace; providing a safe work environment; maintaining equitable compensation systems; and committing to the personal and professional development of the employees through meaningful training and recognition programs.

Management Services Management Services is responsible for Information Technology, Grants Management, and Special Projects for the City.

Finance Department
The Finance Department provides various services to residents, businesses, and other departments in the City. The Finance Director coordinates the activities of the Department's various program areas and serves as the primary contact point for the City Council, other City departments, and the general public. The Finance Director is responsible for preparing the City's Annual Budget and budgetary monitoring throughout the year.
19 - 147
August 2023 132

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FIVE
Table 33 - City of South Pasadena Department Responsibilities (Continued) Department Responsibilities
Fire Department
The Fire Department is an all-risk emergency services agency. Department personnel is trained to handle responses such as structure, wildland, vehicle fires, hazardous materials releases, rescues, and service calls. In addition, it provides advanced life support and medical transport. The Fire Prevention Bureau works to prevent or reduce fire losses and ensure compliance with applicable codes and ordinances. The Department also oversees the City’s emergency management program that coordinates with all City Departments to strengthen the City's ability to prepare for, mitigate, respond to, and recover from any disaster. The Fire Department is the lead department to coordinate all emergency management activities for the City.

Library Department
The Library is governed by the Library Board of Trustees, whose members are appointed by the City Council. Library staff oversees a collection of approximately 120,000 titles in various formats, the circulation of more than 340,000 items, and over 233,000 visits. The Library has free high-speed Wi-Fi and computer workstations for children, teens, and adults.

Public Works
Department
The Public Works Department provides for the efficient operation of public works systems and programs such as water system management, sewer maintenance, waste management and recycling, water conservation, traffic management, street design and maintenance, maintenance of public facilities and parks, and graffiti removal while protecting the environment and responding to the needs of the citizens. Public Works Administration coordinates all activities of the City's Capital Improvement Program. It also reviews plans, issues permits, and provides inspections for private construction projects involving grading or public right-of-way work.

Police Department
The Police Department comprises the Field Operations Division, which provides frontline police services to the City, and the Traffic Unit, which conducts traffic enforcement, community education, and collision investigation. The Department’s Detective Bureau is responsible for conducting follow-up investigations on criminal cases. The Support Services Division is made up of the Communications Division and the Records Division.

Community
Development
The Community Development Department provides staff services to the Planning, Cultural Heritage Commission and the Design Review Board. The planning staff administers land use and development regulations, processes land use permits, and does long-range land use planning. In addition, the Department is responsible for the planning and development review of the built environment in South Pasadena.

Community Services
The Community Services Department oversees the City’s parks and museum, various recreation and youth programs, Citywide special events, senior services, and the Dial-a-Ride program.
19 - 148
August 2023 133

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Capital Improvement Program
In accordance with section 65401 of the California Government Code, a City that has adopted a General Plan and recommends, prepares plans for, or constructs major public works, shall also prepare a coordinated program of proposed public works for the ensuing fiscal year. The CIP for fiscal year (FY) 2022-2023 is included in the City’s Preliminary FY 2022-2023 Budget. In addition, a Five-Year CIP is included as an attachment to the Budget, which outlays planned physical improvements, such as buildings, transportation, street projects, parks, water & sewer facilities, etc. These projects are recommended for adoption in future proposed budgets for fiscal years 2023-2024 through 2026-2027. This CIP does not include costs for operational functions, programs, and routine maintenance activities, as is typical of CIPs. Furthermore, the attached five-year CIP includes references to the City’s current General Plan to demonstrate that the proposed projects support, promote, or implement the statements, goals, policies, and programs in the General Plan. Table 34 shows each line item in the capital improvement program.

Table 34 - City of South Pasadena Capital Improvement Program Projects FY 2022 to FY 2027 Project Name Appropriated
21-22
Carryover
From 21-22
Proposed
22-23
Proposed
23-24
Proposed
24-25
Proposed
25-26
Proposed
26-27 Total

GENERAL BUILDINGS & FACILITIES
Computerized Maintenance Mgmt. System $150,000 $150,000 - - - - - $150,000 Citywide Facilities Assessment $100.000 $100,000 $100,000 - - - - $200,000 Citywide Facilities Repairs - - $150,000 $250,000 $500,000 $500,000 $500,000 $1,900,000 825 Mission Yard Security Gates $160,000 $160,000 - - - - - $160,000 War Memorial HVAC Repairs - - $25,000 - - - - $25,000
Total $2,435,000

COMMUNITY DEVELOPMENT
CD Permit Management Software - - $310,000 $140,000 - - - $450,000 CD Digital Records Scanning & Mgmt. - - $45,000 - - - - $45,000 Total $495,000

INFORMATION TECHNOLOGY
VoIP Phone / Network System - - $200,000 $200,000 - - - $400,000 Customer Care System - - - - $25,000 - - $25,000
Agenda Management System - - - - $25,000 - - $25,000
Total $450,000

LIBRARY
Security Camera System $20,000 $20,000 - - - - - $20,000 HVAC Repairs - - $25,000 - - - - $25,000
Northeast Ramp Lighting - - $20,000 - - - - $20,000
19 - 149
August 2023 134

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 34 - City of South Pasadena Capital Improvement Program Projects FY 2022 to FY 2027 (Continued) Project Name Appropriated
21-22
Carryover
From 21-22
Proposed
22-23
Proposed
23-24
Proposed
24-25
Proposed
25-26
Proposed
26-27 Total

LIBRARY
HVAC Children’s Room - - - $12,000 - - - $12,000
Repair Children’s Room Windows - - - $10,000 - - - $10,000 Radio Frequency Identification System - - - $160,000 - - - $160,000 Exterior Park Lighting - - - $220,000 - - - $220,000
Public Restrooms Expansion & Remodel - - - $240,000 - - - $240,000 Emergency Solar Backup & Storage - - - - $475,000 - - $475,000 Cooling Center Backup HVAC - - - - $20,000 - - $20,000
Total $1,202,000

COMMUNITY SERVICES & PARKS
Grevelia & Berkshire Pocket Parks $178,025 $178,025 $825,000 - - - - $1,003,025 Golf Course & Driving Range Net Replace $100,000 - $750,000 - - - - $750,000 War Memorial Sound System - - $50,000 - - - - $50,000
Recreation Facilities Key System - - $75,000 - - - - $75,000 Parks Master Plan - - - $150,000 - - - $150,000
Snake Trail Improvements - - - $50,000 $300,000 - - $350,000 Garfield Park Fitness Equipment - - - $100,000 - - - $100,000 Arroyo Park Fitness Equipment - - - $100,000 - - - $100,000 Eddie Park Restrooms - - - $100,000 - - - $100,000
Orange Grove Gazebo - - - - $150,000 - - $150,000
Orange Grove Park Playground - - - - $200,000 - - $200,000 Arroyo Walking Trail - - - - $200,000 $150,000 - $350,000 Garfield Gazebo - - - - - $200,000 - $200,000
Eddie Park Playground Replacement - - - - - $150,000 - $150,000 Arroyo Park Sports Complex - - - - - - $750,000 $750,000 Orange Grove Sports Complex - - - - - - $750,000 $750,000 Total $5,753,025

PUBLIC SAFETY (POLICE & FIRE)
PD Front Counter/Lobby Remodel - - $16,000 - - - - $16,000 PD Locker Room Remodel - - $180,000 - - - - $180,000
PD Briefing/Training Room Update - - $18,000 - - - - $18,000 PD Interior Paint, Drywall, & Millwork - - $12,000 - - - - $12,000 Fire Station Bay Apparatus Door - - $80,000 - - - - $80,000 Total $306,000
19 - 150
August 2023 135

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 34 - City of South Pasadena Capital Improvement Program Projects FY 2022 to FY 2027 (Continued) Project Name Appropriated
21-22
Carryover
From 21-22
Proposed
22-23
Proposed
23-24
Proposed
24-25
Proposed
25-26
Proposed
26-27 Total
Sewer
System Repair & Rehabilitation - - $500,000 $810,000 $878,000 $820,000 $1,014,500 $4,022,500 Total $4,022,500
Stormwater
Rio Honda Load Reduction - - $5,000 $50,000 - - - $55,000 Arroyo Seco, San Rafael, San Pascual - - $1,214,953 $3,528,202 $3,528,202 - - $8,271,357 Lower Arroyo Seco Projects - - - $750,000 $760,000 $5,800,000 $17,000,000 $24,310,000 Huntington Drive Green Street - - - $250,000 $2,000,000 $3,000,000 - $5,250,000 Camino Verde Pocket Park - - - - $100,000 $600,000 $900,000 $1,600,000 Total $39,486,357

STREETS
Street Repavement & Repairs $2,313,936 $2,313,936 $1,667,093 $1,800,000 $2,000,000 $2,000,000 $2,000,000 $11,781,026 Sidewalk Replacement & Repairs $216,597 $216,597 $105,126 $120,000 $120,000 $120,000 $120,000 $801,723 Total $12,582,752

SUSTAINABILITY
Climate Action Plan $120,000 $120,000 - $100,000 $100,000 $100,000 $100,000 $520,000 Civic Center/City Hall EV Charging Sys - - $350,000 - - - $150,000 $500,000 Civic Center/Mound Solar Panels - - - - - - - -
Arroyo Park EV Charging Systems - - $50,000 - - - $50,000 $100,000 Urban Forest Master Plan - - - $150,000 - - $150,000
Total $1,270,000

TRANSPORTATION & TRAFFIC
Fremont/Huntington Project - - $475,000 $3,400,000 $5,200,000 $4,000,000 $3,000,000 $16,075,000 North-South Corridor ITS Deployment - - $867,331 $282,669 $5,000,000 $5,000,000 - $11,150,000 Rectangular Rapid Flashing Beacons $43,540 $43,540 $238,465 - - - - $282,005 Grevelia and Fair Oaks Avenue - - $50,000 $150,000 - - - $200,000 Pedestrian Crossing Devices - - $200,000 $122,624 - - - $322,624 Garfield and Monterey Signal & Bicycle - - - $100,000 $300,000 - - $400,000 Columbia Striping & Signals Orange Grove - - - $50,000 $250,000 - - $300,000 Orange Grove Avenue Project - - - $50,000 $100,000 $350,000 - $500,000 Mission Meridian-El Centro Bollard System - - - $50,000 $200,000 - - $250,000 Citywide Mobility Plan Update - - - $150,000 - - - $150,000 Fair Oaks / 110 Interchange Controller - - - $750,000 $1,500,000 $2,000,000 $2,500,000 $6,750,000 Traffic Signal Controller Replacement - - - - - $300,000 $300,000 $600,000 Total $36,979,629
19 - 151
August 2023 136

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN SECTION FIVE
Table 34 - City of South Pasadena Capital Improvement Program Projects FY 2022 to FY 2027 (Continued) Project Name Appropriated
21-22
Carryover
From 21-22
Proposed
22-23
Proposed
23-24
Proposed
24-25
Proposed
25-26
Proposed
26-27 Total
Water
Water Main Pipeline Repairs $1,134,628 $1,134,628 $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $10,134,628 Raymond& Bilikie TanksImprovements $80,000 $80,000 $40,000 - - - - $120,000 Westside Reservoir Design/Construction $550,000 $550,000 - - $2,000,000 $7,000,000 $6,000,000 $15,550,000 Water Facility Site Improvements - - $88,000 $50,000 $250,000 $250,000 $250,000 $888,000 Advanced Metering Infrastructure - - $150,000 $300,000 $500,000 $1,000,000 $1,000,000 $2,950,000 SCADA Upgrade - - - - $150,000 $150,000 $150,000 $450,000 Total $30,092,628

ALL PROJECTS
Total $5,166,726 $5,066,726 $9,881,968 $16,745,495 $29,031,202 $35,490,000 $38,534,500 $269,499,72 19 - 152
August 2023 137

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FIVE
City Funding Sources
There may be funding sources available in the City's regularly budgeted accounts. Examples of these are noted in Table 36.

Table 35 - Internal City Funding Sources
City Fund Potential Mitigation Actions
General Fund Ongoing Programs
Capital Improvement Program Capital Projects
Grant Funding New Projects and Programs
Enterprise Accounts Ongoing Programs
Bond Measures Capital Projects and Programs
As noted in 5.1.3, Hazard Mitigation Benefit-Cost Review, there at potential outside funding sources for mitigation measures. These include:

Table 36 - Potential Outside Funding Sources
Acronym Funding Source Name
HMGP Hazard Mitigation Grant Program(FEMA)
CDBG Community Development Block Grants
FMA Flood Mitigation Assistance (FEMA)
FHA Federal Highway Administration
CalOES California Office of Emergency Service
CalTrans California Department ofTransportation
PDM Pre-Disaster Mitigation (FEMA)

5.6 Implementation Through Existing Programs
The effectiveness of the City’s non-regulatory LHMP depends on implementing the Plan and incorporating the outlined mitigation action items into existing City plans, policies, and programs. The Plan includes a range of action items that, if implemented, would reduce loss from hazard events. Together, the mitigation action items in the Plan provide the framework for activities that the City can choose to implement over the next five years. Accordingly, the City has prioritized the Plan’s goals and identified actions that will be implemented (resources permitting) through existing plans, policies, and programs.

The Fire Department has taken on the responsibility for overseeing the Plan’s implementation and maintenance through the City’s existing programs. The City’s Emergency Manager will be responsible for facilitating LHMP implementation and maintenance meetings. Although the Fire Department will have primary responsibility for review, coordination, and promotion, plan 19 - 153
August 2023 138

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION FIVE
implementation and evaluation will be a shared responsibility among all departments identified in the mitigation action plan. The City will work with other Regional organizations to ensure consistency with all relevant plans.

5.7 Incorporation Into Existing Planning Mechanisms
As stated in Section 3.4, information on hazards, risk, vulnerability, and mitigation contained in this Plan is based on information from similar planning documents used by the City. The General Plan and the LHMP work together to reduce risk exposure to the City. Many of the ongoing recommendations identified in the mitigation strategy are programs recommended by the General Plan, Strategic Plan, and other adopted plans. As used in the preparation of the LHMP, the City will continue to coordinate the Plan’s recommendations with other planning processes and programs, which include:
• City of South Pasadena General Plan
• City of South Pasadena Strategic Plan
• City of South Pasadena Capital Improvement Program
• South Pasadena Building Codes
• South Pasadena Building Design Guidelines
• South Pasadena Emergency Operations Plan
• Los Angeles County Emergency ManagementPlan
19 - 154
August 2023 139

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SIX
Section Six - Plan Maintenance Process
This Chapter identifies the formal process to ensure that the City of Pasadena’s LHMP remains an active and relevant document. The Plan maintenance process includes a schedule for monitoring and evaluating the Plan annually and producing an update every five years.

This chapter describes how the City will integrate public participation throughout the plan maintenance and implementation process. In addition, the Plan's format allows the City to readily update sections when new data becomes available, resulting in a Plan that will remain current and relevant to South Pasadena.

6.1 Monitoring, Evaluating, and Updating the Plan
Coordinating Body
The City of South Pasadena’s Technical Advisory Committee (TAC) will be responsible for the maintenance of this LHMP. The Fire Department will lead in LHMP maintenance issues by coordinating the maintenance of this plan, undertaking the formal review process, and revising the LHMP.

Convener
The City’s assigned Emergency Manager will facilitate the TAC meetings and assign tasks such as updating and presenting the Plan to other Departments, Stakeholder Groups, and elected officials. Plan implementation and evaluation will be a shared responsibility among all of the TAC.

Monitoring
It will be the responsibility of the Division Chief to track the implementation of the LHMP and report back to the TAC with their findings. As a part of the yearly budget process occurring at the beginning of the calendar year, they will evaluate the progress of each action item with the department responsible for its implementation. Refer to Sections 6.2 and 6.3. In addition, they will coordinate with the Fire Chief on an ongoing basis on the Plan’s progress. Finally, public input will be obtained by consulting with the City’s Planning Commission, Public Safety Commission, and the Natural Resources and Environmental Commission.

Evaluation
The minimum task of the annual hazard mitigation planning team meeting will be to evaluate the Plan's progress and incorporate the actions into other planning documents. This review will include the following:
• Summary of any hazard events that occurred during the prior year and their impact on the City. • Review of successful mitigation initiatives identified in the Plan. • A brief discussion about why targeted mitigation strategies were not completed. 19 - 155
August 2023 140

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SIX
• Re-evaluation of the Mitigation Actions to determine if the timeline for identified projects needs to be amended (such as changing a long-term project to a short-term project due to funding availability). • Review by the City’s TAC on an annual basis.
• Recommendations for new mitigation actions.
• Changes in, or potential for, new funding options/grant opportunities. • Integration of new GIS data and maps that can be used to update the Plan. • Evaluation of other planning programs or initiatives within the City involving hazard mitigation.

6.2 Method and Schedule for Updating the Plan Within Five Years Section 201.6.(d)(3) of Title 44 of the Code of Federal Regulations requires that local hazard mitigation plans be reviewed, revised if appropriate, and resubmitted for approval to remain eligible for benefits awarded under the Disaster Mitigation Act (DMA). The City intends to update the Plan on a five-year cycle from the date of plan adoption. It is anticipated that this update process will occur one year before the expiration of the existing plan. This cycle may be accelerated to less than five years based on the following triggers:
• A Presidential Disaster Declaration that impacts the City. • A hazard event that causes a significant amount of damage.

The update process will intend to add new planning process methods, community profile data, hazard data and events, vulnerability analyses, mitigation actions, and goals to the adopted plan so that the Plan will always be current and up to date. Based on the needs identified by the planning team, the update will, at a minimum, include the elements below:
• The update process will be convened through the Technical Advisory Committee and reviewed by the Division Chief to ensure consistency between City plans. • The hazard risk assessment will be reviewed and updated annually using the best available information and technologies.
• Critical structures and mapping evaluation will be updated and improved as funding becomes available.
• The mitigation actions will be reviewed and revised for any actions completed, deferred, or changed to account for changes in the risk assessment or new City policies identified under other planning mechanisms, as appropriate.
• The draft update will be sent to appropriate agencies for comment. • The public will be allowed to comment before adoption. • The South Pasadena City Council will adopt the updated Plan. 19 - 156
August 2023 141

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SIX

6.3 Five-Year LHMP Update Timeline
Based on a midyear 2023 CalOES and FEMA approval date.
• March 2024 - LHMP Progress Report and October 2024 Mitigation Action review • March 2025 - LHMP Progress Report and October 2025 Mitigation Action review • March 2026 - LHMP Progress Report and October 2026 Mitigation Action review • March 2027 - LHMP Progress Report and Plan Update Implementation • October 2027 - Mitigation Action Review
• January 2028 - Submit Update LHMP to CalOES and FEMA
• March 2028 - LHMP Progress Report
• Summer 2028 - Implementation of approved LHMP

6.4 Annual Progress Report Form
As part of the Plan Maintenance Process for the LHMP, the TAC will convene to conduct an annual review to monitor the progress in implementing the LHMP. The LHMP Progress Report Form has been developed for this purpose and will be completed annually.

The LHMP Progress Report Form (Section 6.8) will provide the basis for possible changes to the overall LHMP. The City will be able to refocus on any new or more threatening hazards. In addition, this will allow the City to make any necessary adjustments to or changes in resource allocations and engage additional support for the LHMP implementation if warranted. The findings will be reviewed by the Fire Division Chief and used for the next plan update.

6.5 Adoption
The City of South Pasadena’s City Council is responsible for adopting the Plan. This formal adoption should take place every five years. Once the Plan has been adopted, the City will be responsible for final submission to the California Office of Emergency Services (CalOES). CalOES will then submit the Plan to the Federal Emergency Management City (FEMA) for final review and approval.

6.6 Continued Public Involvement
The public will continue to be apprised of the LHMP actions through the City’s website and by providing copies of the progress report to the public. Upon initiating the LHMP update process, a new public involvement strategy will be developed based on guidance from the planning team. This strategy will be based on the needs and capabilities of the City at the time of the update. At a minimum, this strategy will include the use of local media outlets within the area and the City’s website. 19 - 157
August 2023 142

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SIX

6.7 Point of Contact
Division Chief Eric Zanteson
City of South Pasadena Fire Department
817 Mound Avenue
South Pasadena, CA 91030
(626) 403-7300
19 - 158
August 2023 143

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SIX

6.8 LHMP Annual Progress Report Form

LHMP Annual Progress Report Form
Date:

Name of Person Completing the Report:

Summary of Progress
Have any new hazard/disaster events occurred during the reporting period? If so, list the event(s).

To your knowledge, did anyone from the public comment on the plan during the reporting period? If so, list the comments.

Do the plan's goals, objectives, and mitigation actions address current and expected conditions? If not, please explain further:

Were any mitigation projects identified in the LHMP implemented during the reporting period? If so, list the projects.

What obstacles, problems, or delays did any current or ongoing mitigation projects may encounter? How were the problems solved?
Are currentresources appropriate forimplementing the Plan? Y N Have the outcomes occurred as expected? Y N
Have outside agencies participated as proposed? Y N
Were shortcomings identified? What can the City do to get things back on track? Have there been changes in development trends that could create additional risks? If so, please explain. 19 - 159
August 2023 144

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SIX
This Page Intentionally Left Blank
19 - 160
August 2023 145

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SEVEN
Section Seven - Glossary of Acronyms
Commonly Used Emergency Management Acronyms
A
AAR After-Action Report
AAR / IP After-Action Report / Improvement Plan
AC Area Command
ADA Americans with Disabilities Act
ALS Advanced Life Support
AQI Air Quality Index
ARC American Red Cross
ARES Amateur Radio Emergency Services
ASL Above Mean-Sea-Level
AWMC Agricultural Water Management Council
B
BIA Bureau of Indian Affairs
BLM Bureau of Land Management
BLS Basic Life Support
BRIC Building Resilient Infrastructure and Communities
C
C&O Concept and Objectives
Cal Fire California Department of Forestry and Fire Protection Cal OES California Office of Emergency Services
Cal OSHA California Occupational Safety and Health Administration CCR California Code of Regulations (State Water Board regulations are in Title 23)
CDC Centers for Disease Control
CDEC California Data Exchange Center
CDFW California Department of Fish and Wildlife
CDPH California Department of Public Health
CERT Community Emergency Response Team
CEQA California Environmental Quality Act
CFR Code of Federal Regulations
CFS Cubic Feet per Second
CHP California Highway Patrol
CMUA California Municipal Utilities Association
19 - 161
August 2023 146

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SEVEN
C
COOP Continuity of Operations Plan
COG Continuity of Government
COP Common Operating Picture
CPG Comprehensive Planning Guide
CRT Crisis Response Team
CVP Central Valley Project
CVRWQCB Central Valley WaterQuality Control Board
D
DCF Disaster Control Facility
DHS United States Department of Homeland Security
DMA 2000 Disaster Mitigation Act of 2000
DMP Debris Management Plan
DOC Department Operations Center
DOD United States Department of Defense
DOJ United States Department of Justice
DWR Department of Water Resources
E
EAP Emergency Action Plan
EEG Exercise Evaluation Guide
EF(#) Enhanced Fujita Scale (followed by a #)
EHPSM Environmental and Historic Preservation Screening Memo EMA Emergency Management City
EMAC Emergency Management Assistance Compact
EMMA Emergency Management Mutual Aid
EMPG Emergency Management Performance Grant
EMPT Emergency Management Planning Team
EMS Emergency Medical Services
EMT Emergency Medical Technician
EOC Emergency Operations Center
EOP Emergency Operations Plan
EPA United States Environmental Protection City
ERP Emergency Response Plan
EVC Emergency Volunteer Center
ERT Emergency Response Team
EXPLAN Exercise Plan
19 - 162
August 2023 147

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SEVEN
F
FBI Federal Bureau of Investigation
FE Functional Exercise
FEMA Federal Emergency Management City
FERC Federal Energy Regulatory Commission
FIRESCOPE Firefighting Resources of California Organized for Potential Emergencies FIRM Flood Insurance Rate Map
FMA Flood Mitigation Assistance
FMAG Fire Mutual Aid Grant
FOG Field Operations Guide
FOUO For Official Use Only
FPC Final Planning Conference
FPPC Fair Political Practices Commission
G
G&T Preparedness Directorate’s Office of Grants and Training GIS Graphical Information System
GPS Global Positioning System
H
HMAG Hazard Mitigation Assistance Grant
HazMat Hazardous Materials
HMGP Hazard Mitigation Grant Program
Hotwash Debriefing of Personnel Immediately after an Exercise HSC Homeland Security Council
HSEEP Homeland Security Exercise and Evaluation Program HSPD Homeland Security Presidential Directive
HSPD-5 Homeland Security Presidential Directive-5
I
IAEM International Association of Emergency Managers
IAP Incident Action Plan
IC Incident Commander
ICS Incident Command System
IDE Initial Damage Estimate
ICP Incident Command Post
IMAT Incident Management Assistance Team
IPC Initial Planning Conference
IS Independent Study (FEMA Course)
19 - 163
August 2023 148

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SEVEN
J
JIC Joint Information Center
JIS Joint Information System
JOC Joint Operations Center
K
L
LDRM Local Disaster Recovery Manager
LEPC Local Emergency Planning Committee
LHMP Local Hazard Mitigation Plan
LNO Liaison Officer
LOTO Lock-out/Tag-out
M
MA Mutual Aid
MAC Multi City Coordination
MACS Multi-City Coordination System
MCI Mass Casualty Incident
MH Medical Health
MHOAC Medical Health Operational Area Coordinator
MMI Modified Mercalli Index
MOU Memorandum of Understanding
MSEL Master Scenario Events List
MW Moment Magnitude
N
NDRF National Disaster Recovery Framework
NFIP National Flood Insurance Program
NIC National Incident Management System (NIMS) Integration Center NIMS National Incident Management System
NGO Non-Governmental Organization
NOAA National Oceanic and Atmospheric Administration
NPREP National Preparednessfor Response Exercise Program NPS National Preparedness System
NRF National Response Framework
NWS National Weather Service
19 - 164
August 2023 149

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SEVEN
O
OA Operational Area
OES Office of Emergency Services
OSHA Occupational Health and Safety Administration
P
PM2.5 Particulate Matter (2.5 microns orsmaller)
PDM Pre-Disaster Mitigation
PDRP Post-Disaster Recovery Plan
PGA Peak Ground Acceleration
PHA Peak Horizontal Acceleration
PIO Public Information Officer
PMF Probable Maximum Flood
POC Point of Contact
PPD Presidential Policy Directive
PPE Personal Protective Equipment
Q
QPF Quantitative Predictive Forecast
R
R&D Research and Development
REOC Regional Emergency Operations Center
RESTAT Resources Status
RFC Repetitive Flood Claim
RSF Recovery Support Function
RSP Render-Safe Procedures
S
SCADA Supervisory Control And Data Acquisition
SCE Southern California Edison
SEMS Standardized Emergency Management System
SFHA Special Flood Hazard Area
SITREP Situation Report
SMART Simple, Measurable, Achievable, Realistic, Task-oriented SME Subject Matter Expert
SOC State Operations Center
SOP Standard Operating Procedure
SRL Severe Repetitive Loss
SWRCB State Water Resources Control Board
19 - 165
August 2023 150

DRAFT CITY OF SOUTH PASADENA DRAFT

LOCAL HAZARD MITIGATION PLAN

SECTION SEVEN
T
TA Homeland Security Preparedness Technical Assistance Program T&EPW Training and Exercise Plan Workshop
TAG Threat Assessment Group
TCL Target Capabilities List
Tech Spec Technical Specialist
TFL Task Force Leader
THIRA Threat and Hazard Identification and Risk Assessment TTX Tabletop Exercise
U
UC Unified Command
UAC Unified Area Command
USACE United States Army Corps of Engineers
USAR Urban Search and Rescue
USBR United States Bureau of Reclamation
USFS United States Forest Service (Dept. of Agriculture) USFWS United States Fish and Wildlife Service
USGS United States Geological Survey
UTL Universal Task List
UW United Way
V
VIP Very Important Person
VOAD Volunteer Organizations Active in Disasters
W
WHO World Health Organization
WUI Wildland-Urban Interface
X
Y
Z
19 - 166
City Council
Agenda Report
DATE: August 16, 2023
FROM: Armine Chaparyan, City Manager {.}(/'
PREPARED BY: Luis Frausto, Management Services Director Mark Perez, Deputy City Clerk
ITEM NO.

SUBJECT: Consideration of Approval of City Council Meeting Minutes for June 1 1 20221 and October 3, 2022
Recommendation
It is recommended that the City Council consider the:

1. Approval of minutes for the June 1, 2022, City Council Meeting; and

2. Approval of minutes for the October 3, 2022, Special City Council Meeting.

Executive Summary
The City Clerk's Division is diligently working on backlogged City Council meeting minutes dating back to May 2022. Attached to this staff report are meeting minutes for June 1, 2022, and October 3, 2022. Staff is committed to submitting the most recent meeting minutes, as well as two prior meeting minutes, at each council meeting for approval moving forward until minutes are current. Staff will maintain timely minutes thereafter.

Background
The City Clerk's Division is responsible for producing meeting minutes for the City Council meetings. Meeting minutes are used as the official record of the actions taken by the City at the direction of the City Council. They are also used for confirmation of approval for purchases by the City, as approved by the City Council. Currently, the division is working towards the completion of the backlog of minutes.

Current staff has developed a high quality, accurate and timely minutes process, and are working diligently to address past minutes as well as maintain timely minutes moving forward.

Analysis
Attached for the City Council's consideration and approval are meeting minutes for various dates as listed on the agenda, and hereby included as attachments to this staff report.
20 20 - 1
Approval of City Council Meeting Minutes
August 16, 2023

Page 2 of 2 ends

Key Performance Indicators and Strategic Plan
This item is in line with the Management Services Department’s Key Performance Indicator to provide quick access to information and accountability, ensuring public transparency.

Fiscal Impact
To date, the City has paid approximately $19,575 to Marc A. Donohue for the production of City Council meeting minutes over the term of the contract. There is one additional consultant fee anticipated for $2,000 dollars set for the payment on the August 16, 2023 warrant. With the payment of this invoice, there are no future consultant fees anticipated as Division staff is facilitating the work related to this project.

Attachments:

1. June 1, 2022, Regular City Council Meeting Minutes

2. October 3, 2022, Special City Council Meeting Minutes 20 - 2
ATTACHMENT 1
June 1, 2022, Regular City Council Meeting Minutes
20 - 3

THIS PAGE

INTENTIONALLY

LEFT BLANK
20 - 4

CITY OF SOUTH PASADENA

REGULAR MEETING OF THE CITY

COUNCIL

M I N U T E S
WEDNESDAY, JUNE 01, 2022, AT 7:00 P.M.

CALL TO ORDER:

The Regular Meeting of the South Pasadena City Council was called to order by Mayor Cacciotti on Wednesday, June 01, 2022, at 7:13 P.M. in the City Council Chambers, 1424 Mission Street, South Pasadena, California 91030.

ROLL CALL:

PRESENT Mayor Michael Cacciotti
Mayor Pro Tem Jon Primuth
Councilmember Jack Donovan
Councilmember Evelyn G. Zneimer
Councilmember Diana Mahmud
ABSENT None
Christina Munoz, Deputy City Clerk, announced a quorum.

CITY STAFF PRESENT:

Arminé Chaparyan, City Manager; Andrew Jared, City Attorney; Christina Munoz, Deputy City Clerk were present at Roll Call. Other staff members presented reports or responded to questions as indicated in the minutes.

PLEDGE OF ALLEGIANCE
Mayor Michael Cacciotti led the Flag Salute.
20 - 5
Regular Meeting Minutes June 01, 2022
South Pasadena City Council Page 2

CLOSED SESSION ANNOUCEMENTS

1. CLOSED SESSION ANNOUNCEMENTS
A. CONFERENCE WITH LEGAL COUNSEL: INITIATION OF LITIGATION Government Code Section 54956.9(d)(4)
Number of Potential Cases: 2
B. CONFERENCE WITH LABOR NEGOTIATORS
(Government Code Section 54957.6)
Conference with Labor Negotiators regarding labor negotiations with the following groups:
- South Pasadena Police Officers’ Association
- South Pasadena Firefighters’ Association
- South Pasadena Public Service Employees’ Association
- South Pasadena Public Service Part Time Employees’ Association - Unrepresented Management Employees
City Negotiators: City Manager Arminé Chaparyan; Human Resources and Risk Manager Belinda Varela
C. PUBLIC EMPLOYMENT- PERFORMANCE EVALUATION
(Government Code Section 54957(b)(1))
Title: City Manager
City Attorney Andrew Jared noted that the City Council recessed into Closed session at 5:00 P.M. with all councilmembers were present.

City Attorney Jared reported that no action was taken. The City Council recessed from Closed Session at 7:10 P.M.

PUBLIC COMMENT

2. PUBLIC COMMENT – GENERAL (NON-AGENDA ITEMS)
In Person Comments:

Alan Ehrlich spoke regarding invoices paid by the city.

Joe Payne spoke regarding the Festival of Balloons and the poster contest winners.

Sandy Kitto spoke regarding their excitement in taking over the Festival of Balloons’ poster contest going forward.
20 - 6
Regular Meeting Minutes June 01, 2022
South Pasadena City Council Page 3

PRESENTATIONS

3. MERCHANT MINUTE – Cos & Pi
Laurie Wheeler, South Pasadena Chamber of Commerce, introduced Xochilt Perez and Casey Wiele owners of Cos & Pi, and played a short video.

4. PROCLAMATION DECLARING THE MONTH OF JUNE 2022 AS “PRIDE MONTH” IN THE CITY OF SOUTH PASADENA
Mayor Cacciotti presented a proclamation declaring June 2022 as “Pride Month”.

COMMUNICATIONS

5. COUNCILMEMBER COMMUNICATIONS
Councilmember Zneimer spoke regarding her recent attendance at the Public Works Week Luncheon, AAPI Celebration, The Special Finance Committee Meeting, Meeting with South Pasadena School District, ribbon cutting ceremony celebrating the 10th anniversary of the “Beyond the Classroom” program, and the Memorial Day program.

Councilmember Mahmud spoke regarding her recent attendance at the Library Board of Trustee meeting and various regional body committee meetings and recognized all of South Pasadena volunteers.

Councilmember Donovan had no comments.

Mayor Pro Tem Primuth spoke regarding his attendance at the AAPI Celebration, the School District Ad Hoc Committee meeting, Arroyo Verdugo JPA Meeting, and the SCAG Transportation Committee meeting.

Mayor Cacciotti gave a brief PowerPoint presentation highlighting the “We, Too, Are America” event, Public Works Week luncheon, AAPI event, Natural Resources and Environmental Commission, the Memorial Day Program at the War Memorial and various regional body committee meetings.

6. CITY MANAGER COMMUNICATIONS
City Manager Arminé Chaparyan had no comments.

7. REORDERING OF, ADDITIONS, OR DELETIONS TO THE AGENDA Item No. 13 was moved to be heard prior to the Public Hearing item with no objection. 20 - 7
Regular Meeting Minutes June 01, 2022
South Pasadena City Council Page 4

CONSENT CALENDAR

A motion was made by Councilmember Zneimer, seconded by Councilmember Donovan and approved by roll call vote to approve Consent Calendar Item No. 10 as presented. Councilmember Mahmud requested to pull Item No. 11 for separate discussion. Item Nos. 8 and 9 were pulled for separate discussion via public comment. The motion carried 5-0, by the following vote:

AYES: Donovan, Mahmud, Primuth, Zneimer, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

8. APPROVAL OF PREPAID WARRANTS IN THE AMOUNT OF $219,026.22; GENERAL CITY WARRANTS IN THE AMOUNT OF $393,457.86; ONLINE PAYMENTS IN THE AMOUNT OF $6,768.02; TRANSFERS IN THE AMOUNT OF $265,840.74; PAYROLL IN THE AMOUNT OF $721,549.00
Recommendation
It is recommended that the City Council approve the Warrants as presented.

In Person Public Comment
Alan Ehrlich spoke regarding the Covid-19 testing, City Attorney Services, and car maintenance invoices.

COUNCIL ACTION AND MOTION
Mayor Cacciotti directed staff to get back to Council on invoice questions.

After discussion, a motion was made by Councilmember Mahmud, seconded by Councilmember Zneimer and approved by roll call vote to approve Consent Calendar Item No. 8, as presented by staff. Item No. 8 was pulled for separate discussion via public comment. The motion carried 5-0, by the following vote:

AYES: Donovan, Mahmud, Primuth, Zneimer, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

9. MONTHLY INVESTMENT REPORT FOR MARCH 2022
Recommendation
It is recommended that the City Council receive and file the Monthly Investment Report for March 2022.
20 - 8
Regular Meeting Minutes June 01, 2022
South Pasadena City Council Page 5
In Person Public Comment
Alan Ehrlich spoke regarding the investment policy.

COUNCIL ACTION AND MOTION
A motion was made by Councilmember Mahmud, seconded by Mayor Pro Tem Primuth, and approved by roll call vote to approve Consent Calendar Item No. 9, as presented by staff. Item No. 9 was pulled for separate discussion via public comment. The motion carried 5-0, by the following vote:

AYES: Donovan, Mahmud, Primuth, Zneimer, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

10. SECOND READING AND ADOPTION OF AN ORDINANCE ADOPTING A POLICY

FOR THE APPROVAL, ACQUISITION, AND REPORTING OF MILITARY

EQUIPMENT BY THE SOUTH PASADENA POLICE DEPARTMENT

ORDINANCE

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF

SOUTH PASADENA, CALIFORNIA, ADOPTING A POLICY FOR

THE USE OF MILITARY EQUIPMENT BY THE SOUTH

PASADENA POLICE DEPARTMENT
Recommendation
It is recommended that the City Council read by title only for second reading, waiving further reading, and adopt an ordinance adopting a Military Equipment Use Policy for the approval, acquisition, and reporting of Military Equipment by the South Pasadena Police Department, as required by Assembly Bill 481 (AB 481).

A motion was made to approve recommendation on the Consent Calendar.

Ordinance No. 2365 was approved.

11. SECOND READING AND ADOPTION OF AN ORDINANCE FOR THE CREATION

OF A COMMUNITY SERVICES COMMISSION, AND CHANGE TO THE MEETING

FREQUENCY OF THE PUBLIC ARTS COMMISSION MEETINGS

ORDINANCE

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
SOUTH PASADENA, CALIFORNIA, AMENDING SECTIONS 2.44
THROUGH 2.46 OF ARTICLE IVC “PARKS AND RECREATION”
OF CHAPTER 2, SECTION 2.24 AND 2.30 OF ARTICLE IV
“BOARDS AND COMMISSIONS”, ARTICLE IVE “ANIMAL
COMMISSION”, SECTION 2.79-11 OF ARTICLE IVL “PUBLIC
20 - 9
Regular Meeting Minutes June 01, 2022
South Pasadena City Council Page 6
ARTS COMMISSION”, AND ARTICLE IVF “SENIOR CITIZEN
COMMISSION”, OF THE SOUTH PASADENA MUNICIPAL CODE
TO REFLECT CITY COUNCIL’S DIRECTION IN
CONSOLIDATING CITY’S YOUTH, PARKS AND RECREATION,

AND SENIOR COMMISSIONS TO COMMUNITY SERVICES

COMMISSION AND REDUCING FREQUENCY OF THE PUBLIC
ARTS COMMISSIONS.

Recommendation
It is recommended that the City Council approve the creation of a Community Services Commission, and approve a change to the frequency of meetings of the Public Arts Commission by adopting an ordinance amending Chapter 2 of the City Code.

COUNCIL ACTION AND MOTION

Councilmember Mahmud requested to pull Item No. 11 for separate discussion.

Councilmember Mahmud discussed revisions to the Ordinance. Mayor Cacciotti requested that staff provide notice to the school district regarding Section 2.45 of the Ordinance.

After the motion was made, City Attorney Jared commented that the revisions to the Ordinance reverts the Ordinance back to first reading and staff will bring back to Council for a second reading at another meeting. The change was accepted by the maker of the motion.

A motion was made by Councilmember Mahmud, seconded by Councilmember Donovan and approved by roll call vote to amend the Ordinance with the words “Parks and Recreation” to be removed in Section 2.6 of the redlined version of the Ordinance and reintroduce for first reading the ordinance as stated by the City Attorney. The motion carried 5-0, by the following vote:

AYES: Donovan, Mahmud, Primuth, Zneimer, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

PUBLIC HEARING

12. REVIEW OF FISCAL YEAR 2022-2023 ANNUAL BUDGET AND ADOPTION OF

THE FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM
Recommendation
It is recommended that the City Council:
20 - 10
Regular Meeting Minutes June 01, 2022
South Pasadena City Council Page 7

1. Conduct a Public Hearing regarding the proposed 2022-23 Annual Budget;

2. Approve Updated List of Designated Reserves;

3. Approve items to be funded by the State and Local Fiscal Recovery Fund (SLFRF); and

4. Adopt the 2022/2023 through 2026/2027 Five Year Capital Improvement Program (CIP) consistent with the City’s General Plan.

Finance Director Ken Louie gave a presentation.

Public Works Director Ted Gerber gave a presentation.

The Mayor opened the Public Hearing.

In Person Comments:

Alan Ehrlich spoke regarding the fiscal sustainability fund, the C.I.P., and staffing changes.

The Mayor closed the Public Hearing for the C.I.P.

COUNCIL ACTION AND MOTION
Mayor Pro Tem Primuth suggested restricting Slater Fund Reserve to 626 Prospect Ave. litigation and any other potential litigation with respect to Caltrans homes. No opposition from Council.

With no opposition, Council agreed to give Slater Funds new title, “Cal Trans Housing/626 Prospect Ave. Litigation Reserve” with description from Councilmember Mahmud and Mayor Cacciotti to include “For past, current, and future costs.”
Councilmember Zneimer directed staff to insert a bullet in the Water Division section of the budget to provide Water Conservation kit outreach to the public and Water Conservation enforcement.

A motion was made by Mayor Pro Tem Primuth, seconded by Councilmember Zneimer, and approved by roll call vote to approve Recommendation Nos. 2, and 3, with modifications to Designated Reserve fund title as discussed and the recovery fund item. The motion carried 5-0, by the following vote:

AYES: Donovan, Mahmud, Primuth, Zneimer, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

Council waived presentation for C.I.P.
20 - 11
Regular Meeting Minutes June 01, 2022
South Pasadena City Council Page 8
After extensive discussion, a motion was made by Mayor Pro Tem Primuth, seconded by Councilmember Mahmud and approved by roll call vote to approve Recommendation No. 4, with modifications to include direction from Council on grants, strategic plan link on social media, addition of Eddie Park with no amount identified, and keep the public hearing on the budget open until June 15th. The motion carried 5-0, by the following vote:

AYES: Donovan, Mahmud, Primuth, Zneimer, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

ACTION / DISCUSSION

13.DIRECTION AND APPROVAL OF FINANCIAL POLICIES AND PROCEDURES Recommendation
It is recommended that the City Council:

1. Review and approve the Financial Policies and Procedures with consideration of the Finance Commission’s recommended changes.

2. Direct staff to amend the South Pasadena Municipal Code to modifying the purchasing limits.

Interim Director of Finance Ken Louie, with Rick Hayden and Pete Gonda from Management Partners, presented on the Financial Policies and Procedures.

In Person Public Comment:

Alan Ehrlich commented on the presented purchasing policies and procedures.

COUNCIL ACTION AND MOTION
City Attorney Jared and City Manager suggested receiving all feedback and direction from Council and consultants and bring back for first reading. After extensive discussion, City Council requested suggestions be made and to be brought back to Council for review and discussion.

PUBLIC COMMENT – CONTINUED

14. CONTINUED PUBLIC COMMENT – GENERAL
None.

ADJOURNMENT
There being no further matters, Mayor Cacciotti adjourned the meeting of the City Council at 11:01 P.M.
20 - 12
Regular Meeting Minutes June 01, 2022
South Pasadena City Council Page 9
Respectfully submitted:
_______________________________
Mark Perez
Deputy City Clerk
APPROVED:
_______________________________
Jon Primuth
Mayor
ATTEST:
________________________________
Mark Perez
Deputy City Clerk
Approved at City Council Meeting:
20 - 13

THIS PAGE

INTENTIONALLY

LEFT BLANK
20 - 14
ATTACHMENT 2
October 3, 2022, Special City Council Meeting Minutes
20 - 15

THIS PAGE

INTENTIONALLY

LEFT BLANK
20 - 16

CITY OF SOUTH PASADENA

SPECIAL MEETING OF THE CITY

COUNCIL

M I N U T E S
WEDNESDAY, OCTOBER 3, 2022, AT 8:30 A.M.

CALL TO ORDER:

The Special Meeting of the South Pasadena City Council was called to order by Mayor Cacciotti on Wednesday, October 3, 2022, at 8:30 A.M. in the City Council Chambers, 1424 Mission Street, South Pasadena, California.

ROLL CALL:

PRESENT Mayor Michael A. Cacciotti
Mayor Pro Tem Jon Primuth
Councilmember Jack Donovan
Councilmember Evelyn G. Zneimer
Councilmember Diana Mahmud
ABSENT None
Desiree Jimenez, Chief City Clerk, announced a quorum.

CITY STAFF PRESENT:

Arminé Chaparyan, City Manager; Andrew Jared, City Attorney; Desiree Jimenez, Chief City Clerk were present at Roll Call. Other staff members presented reports or responded to questions as indicated in the minutes.

PLEDGE OF ALLEGIANCE
The Flag Salute was led by Mayor Cacciotti.
20 - 17
Special Meeting Minutes October 3, 2022
South Pasadena City Council Page 2

PUBLIC COMMENT
None.

PRESENTATIONS
A. MEET AND GREET WITH SUPERVISOR KATHRYN BARGER TO DISCUSS CITY MATTERS RELATED TO, BUT NOT LIMITED TO:

1. Introduction of County of Los Angeles Supervisor Kathryn Barger

2. Introduction of South Pasadena City Council

3. Mental Health Issues in the City/County

4. Housing

5. Safe Clean Water Program Implementation

6. Electrification

7. Transportation
Hearing no opposition, the presentations were received and filed.

ADJOURNMENT
There being no further matters, Mayor Cacciotti adjourned the Special Meeting of the City Council at 10:00 A.M.

Respectfully submitted:
_______________________________
Mark Perez
Deputy City Clerk
APPROVED:
_______________________________
Jon Primuth
Mayor
ATTEST:
________________________________
Mark Perez
Deputy City Clerk
Approved at City Council Meeting:
20 - 18

← All documents from this meeting