Cities Index.
Agenda packet, special meeting

South Pasadena City Council
March 20, 2024

Document
Agenda packet, special meeting
Meeting
March 20, 2024
Body
South Pasadena City Council
Pages
37
Original file
41.5 MB
Text extracted from the city's file for reading and search. Open the original on www.southpasadenaca.gov. That file is the official record.

including the potential ‘road diet’ reduction in lanes, may require further environmental impact evaluation.

Attachments

1. Residential Slow Streets Directive Plans

2. Residential Slow Streets Survey Responses Summary

3. Mission Parklet Design Draft Renderings

4. Mission Street Road Diet Previous Draft Design and Cross Section Exhibits

5. Parklet K-Rail Trim & Coverings Facade Components Fabrication Estimates

6. ProCast Products, Inc. K-Rail Manufacturer Quote and Drawings

7. Proposed Fourth Amendment with Right of Way, Inc.

8. Master On-Call Services Agreement with Right of Way, Inc. with Amendments 17 - 8
ATTACHMENT 1
Residential Slow Streets Directive Plans
17 - 9

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 10

OAK ST DIAMOND AVE
DIAMOND AVE R=5' (TYP.)
36'
22' 40'
7'
35' 20' 6' 6' 7' 10' 7' 11'
7' 10' 38' 48'
35'20'
6' 20'R=15' RAMONA AVE
RAMONA AVE 29'
35'OAK ST 48' 6' 6' 4' 4'
6'
6' 6' 36'
36'20'
6' R=15' 20'
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2023-071_OAK_SHT - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:06 PM Plotstyle table: ALTA NCS Standard.stb MATCHLINE - SEE SHEET 02

MATCHLINE - SEE BELOW LEFT
MATCHLINE - SEE ABOVE RIGHT PLAN 1A SCALE: 1" = 40' PLAN 1B SCALE: 1" = 40' 0 40' 80' Scale: 1" = 40' INSTALL 24" WIDE YELLOW CROSSWALK MARKINGS TO CREATE LADDER CROSSWALK (TYP.) INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL ADDITIONAL WHITE FLEXIBLE DELINEATORS IN CENTER OF PARKING LANE ON BOTH ENDS OF CURB EXTENSIONS (TYP.) INSTALL WHITE FLEXIBLE DELINEATORS AROUND CURB EXTENSION- 10' O.C (TYP.) INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME INSTALL YIELD MARKINGS (TYP.) INSTALL 24" WIDE YELLOW CROSSWALK MARKINGS TO CREATE LADDER CROSSWALK (TYP.) INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL ADDITIONAL WHITE FLEXIBLE DELINEATORS IN CENTER OF PARKING LANE ON BOTH ENDS OF CURB EXTENSIONS (TYP.) INSTALL WHITE FLEXIBLE DELINEATORS AROUND CURB EXTENSION- 10' O.C (TYP.) INSTALL CURB EXTENSION (TYP.) INSTALL NEW SIGN ON POST: R1-5L "YIELD HERE TO PEDESTRIANS" INSTALL NEW SIGN ON POST: R1-5L "YIELD HERE TO PEDESTRIANS" INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME DIRECTIVE PLAN OAK STREET SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE. 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. 1 DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION 17 - 11
OAK ST

FAIR OAKS AVE OAK ST
FREMONT AVE 7' 7'
10'
10'
60'
45' 7' 7' 37' 15' 40' 45'
42' 47' 48' R=5' (TYP.)
6'
6'
36'
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2023-071_OAK_SHT - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:06 PM Plotstyle table: ALTA NCS Standard.stb MATCHLINE - SEE SHEET 03 MATCHLINE - SEE BELOW LEFT
MATCHLINE - SEE ABOVE RIGHT 0 40' 80' Scale: 1" = 40' PLAN 2A SCALE: 1" = 40' PLAN 2B SCALE: 1" = 40' 0 40' 80' Scale: 1" = 40' INSTALL 24" WIDE YELLOW CROSSWALK MARKINGS TO CREATE LADDER CROSSWALK (TYP.) INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL ADDITIONAL WHITE FLEXIBLE DELINEATORS IN CENTER OF PARKING LANE ON BOTH ENDS OF CURB EXTENSIONS (TYP.) INSTALL WHITE FLEXIBLE DELINEATORS AROUND CURB EXTENSION- 10' O.C (TYP.)MATCHLINE - SEE SHEET 01 DIRECTIVE PLAN OAK STREET SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE. 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. 2 DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION 17 - 12

OAK ST OAK ST

MARENGO AVE
STRATFORD AVE 40' 40' 40' 40'
22'
22'
10'
10'
10'
10'
42'
42' R=5' (TYP.)
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2023-071_OAK_SHT - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:06 PM Plotstyle table: ALTA NCS Standard.stb MATCHLINE - SEE SHEET 04 MATCHLINE - SEE BELOW LEFT 0 40' 80' Scale: 1" = 40' MATCHLINE - SEE ABOVE RIGHT MATCHLINE - SEE SHEET 02 PLAN 3A SCALE: 1" = 40' PLAN 3B SCALE: 1" = 40' INSTALL 24" WIDE YELLOW CROSSWALK MARKINGS TO CREATE LADDER CROSSWALK (TYP.) INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL ADDITIONAL WHITE FLEXIBLE DELINEATORS IN CENTER OF PARKING LANE ON BOTH ENDS OF CURB EXTENSIONS (TYP.) INSTALL BIKE LANE CONFLICT ZONE MARKING (84 FT) INSTALL 24" WIDE YELLOW CROSSWALK MARKINGS TO CREATE LADDER CROSSWALK (TYP.) INSTALL WHITE FLEXIBLE DELINEATORS AROUND CURB EXTENSION - 10' O.C (TYP.) INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME DIRECTIVE PLAN OAK STREET SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT 3 DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE. 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. 17 - 13
OAK ST

MILAN AVE
8'
8' 65' 65'
42'
42'
17'

OAK MEADOW LN OAK ST

AMHERST DR

CHELTEN WAY

FLETCHER AVE
16' 16' 65' 65'
8' 20'
40'
40' 30'
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2023-071_OAK_SHT - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:06 PM Plotstyle table: ALTA NCS Standard.stb PLAN 4A SCALE: 1" = 40' PLAN 4B SCALE: 1" = 40' 0 40' 80' Scale: 1" = 40' INSTALL NEW SIGN ON POST: "NO PARKING (RT)" MATCHLINE - SEE SHEET 05 MATCHLINE - SEE BELOW LEFT
MATCHLINE - SEE ABOVE RIGHT MATCHLINE - SEE SHEET 03 INSTALL NEW SIGN ON RUBBER BASE: R1-6 INSTALL 24" WIDE YELLOW CROSSWALK MARKINGS TO CREATE LADDER CROSSWALK (TYP.) INSTALL YELLOW FLEXIBLE DELINEATORS - 10' O.C (TYP.) INSTALL YELLOW FLEXIBLE DELINEATORS - 10' O.C (TYP.) INSTALL NEW 24" WIDE WHITE CROSSWALK MARKINGS TO CREATE LADDER CROSSWALK (TYP.) INSTALL 4" YELLOW DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL 4" SOLID YELLOW STRIPE (TYP.) INSTALL 4" SOLID YELLOW STRIPE (TYP.) INSTALL 4" DASHED YELLOW STRIPE (33 FT) INSTALL 4" YELLOW DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL 4" SOLID YELLOW STRIPE (TYP.) INSTALL STOP BAR AND "STOP" PAVEMENT MARKING (TYP.) INSTALL STOP BAR AND "STOP" PAVEMENT MARKING (TYP.) INSTALL YIELD MARKINGS (TYP.) ALIGN WITH FLETCHER AVE CURB FACE INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME INSTALL NEW SIGN ON POST: "NO PARKING (LT)" INSTALL NEW SIGN ON A-FRAME: "NO PARKING (LT)" INSTALL SIGN ON EXISTING POST: "NO PARKING (RT)" INSTALL NEW SIGN ON POST: INSTALL NEW SIGN "NO PARKING (LT)" ON POST: "NO PARKING (LT)" INSTALL NEW SIGN ON POST: "NO PARKING (RT)" INSTALL SIGN ON EXISTING POST: "NO PARKING (LT)" INSTALL NEW SIGN ON POST: "NO PARKING (LT)" INSTALL NEW SIGN ON POST: R1-5L "YIELD HERE TO PEDESTRIANS" INSTALL NEW SIGN ON POST: R1-5L "YIELD HERE TO PEDESTRIANS" DIRECTIVE PLAN OAK STREET SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT 4 DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE. 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. 17 - 14

CAMDEN PKWY
CAMDEN PKWY OAK ST 35' 20'
10'
10' 10'
20'
42' 23' R=5' (TYP.) R=25'
8'
8'

BUSHNELL AVE OAK ST

WAYNE AVE

WAYNE AVE
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2023-071_OAK_SHT - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:06 PM Plotstyle table: ALTA NCS Standard.stb PLAN 4A SCALE: 1" = 20' DIRECTIVE PLAN OAK STREET SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT PLAN 4B SCALE: 1" = 20' 0 40' 80' Scale: 1" = 40' MATCHLINE - SEE SHEET 05 MATCHLINE - SEE BELOW LEFT
MATCHLINE - SEE ABOVE RIGHT MATCHLINE - SEE SHEET 04 INSTALL WHITE FLEXIBLE DELINEATORS AROUND CURB EXTENSION - 10' O.C (TYP.) INSTALL 24" WIDE WHITE CROSSWALK MARKINGS TO CREATE LADDER CROSSWALK INSTALL ADDITIONAL WHITE FLEXIBLE DELINEATORS IN CENTER OF PARKING LANE ON BOTH ENDS OF CURB EXTENSIONS (TYP.) INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL 4" SOLID WHITE EDGELINE STRIPE (60 FT) INSTALL 4" SOLID WHITE EDGELINE STRIPE (80 FT) INSTALL 4" SOLID WHITE EDGELINE STRIPE (220 FT) INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME NEW CROSSWALK - INSTALL 24" WIDE WHITE CROSSWALK MARKINGS 5 DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE. 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. 17 - 15
GARFIELD AVE AVONREA RD OAK ST 40'
7'
40' R=5'
8' 8'
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2023-071_OAK_SHT - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:07 PM Plotstyle table: ALTA NCS Standard.stb PLAN A SCALE: 1" = 40' 0 40' 80' Scale: 1" = 40' MATCHLINE - SEE SHEET 05 INSTALL WHITE FLEXIBLE DELINEATORS AROUND CURB EXTENSION- 10' O.C (TYP.) INSTALL 24" WIDE WHITE CROSSWALK MARKINGS TO CREATE LADDER CROSSWALK (TYP.) INSTALL ADDITIONAL WHITE FLEXIBLE DELINEATORS IN CENTER OF PARKING LANE ON BOTH ENDS OF CURB EXTENSIONS (TYP.) INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL 4" SOLID WHITE EDGELINE STRIPE (100 FT) INSTALL 4" SOLID WHITE EDGELINE STRIPE (197 FT) INSTALL 4" SOLID WHITE EDGELINE STRIPE (60 FT) MATERIAL SPECIFICATIONS AND GENERAL NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. 4. ALL SIGNING AND STRIPING SHALL CONFORM TO AND BE INSTALLED PER CALTRANS 2018 STANDARD PLANS, SPECIFICATIONS, AND CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 5. CLEAN THE ROADWAY SURFACE OF ANY DEBRIS BEFORE INSTALLATION. 6. FOLLOW MANUFACTURER'S SPECIFICATIONS FOR INSTALLATION. 7. IF REMOVABLE TRAFFIC TAPE IS USED, IT SHALL BE NON-SLIP, RETRO-REFLECTIVE, AND FOLLOW CITY STANDARDS. 8. FOR LONGER-TERM PILOT PROJECTS, INTENDED TO BE IN PLACE OVER ONE MONTH, MORE DURABLE ACRYLIC PAINT IS RECOMMENDED IN HIGH TRAFFIC AREAS. HOWEVER, REMOVAL MAY REQUIRE SPECIAL EQUIPMENT. 9. FLEXIBLE DELINEATOR POSTS SHOULD BE SURFACE-MOUNTED. ONE OPTION COULD BE ADHESIVE BUTYL PADS. 10. REPLACE ANY FLEXIBLE DELINEATOR POSTS THAT BREAK OR ARE REMOVED. REGULARLY CHECK THAT POSTS HAVE NOT BEEN DAMAGED, MOVED, OR REMOVED. 11. REFRESH OR REPLACE ANY PAINT, STENCIL, OR TRAFFIC TAPE THAT MAY HAVE BEEN REMOVED OR FADED. 12. ADA ACCESS MUST BE MAINTAINED WITH ANY CHANGES MADE WITHIN THE PROJECT RIGHT OF WAY. 13. ALL MATERIALS USED TO DELINEATE THE ROADWAY INCLUDING FLEXIBLE DELINEATORS AND PAVEMENT MARKINGS SHALL HAVE RETRO REFLECTIVE PROPERTIES TO ENHANCE NIGHTTIME VISIBILITY. INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME DIRECTIVE PLAN OAK STREET SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT 6 DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION 2022 17 - 16

MISSION ST GRAND AVE
8' 5' 5' 8'
22' 83' 127'
48' GRAND AVE

MAGNOLIA ST

MAGNOLIA ST
8' 5' 5' 8'
22'
48' 200' SPACING (TYP.) 10' 11' 12' 13'
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2021-185_GRAND_SHT-Opt2 - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:08 PM Plotstyle table: ALTA NCS Standard.stb PLAN 1B SCALE: 1" = 40' MATCHLINE - SEE SHEET 2 MATCHLINE - SEE BELOW LEFT 0 40' 80' Scale: 1" = 40' PLAN 1A SCALE: 1" = 40' MATCHLINE - SEE ABOVE RIGHT INSTALL 4" SOLID WHITE STRIPE (156 FT) INSTALL 4" SOLID WHITE STRIPE (200 FT) INSTALL 4" SOLID WHITE STRIPE (162 FT) INSTALL 4" SOLID WHITE STRIPE (220 FT) INSTALL 4" SOLID WHITE STRIPE (400 FT) INSTALL 4" SOLID WHITE STRIPE (332 FT) INSTALL BIKE LANE ARROW AND SYMBOL (TYP.) INSTALL NEW SIGN ON POST: R81(CA) R81B(CA) INSTALL SIGN ON EXISTING POST: R81(CA) R81A(CA) INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME. FIELD LOCATE INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME. FIELD LOCATE INSTALL 6" SOLID WHITE STRIPE (162 FT) INSTALL 6" SOLID WHITE STRIPE (220 FT) INSTALL 6" SOLID WHITE STRIPE (400 FT) INSTALL 6" SOLID WHITE STRIPE (332 FT) INSTALL 6" SOLID WHITE STRIPE (156 FT) INSTALL 6" SOLID WHITE STRIPE (200 FT) DIRECTIVE PLAN GRAND AVENUE SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT 1 DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE. 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. 17 - 17

CHARTER OAK ST

STERLING PL

STERLING PL GRAND AVE
48'
8' 5' 5' 8'
22' 11' 11' 12' 15' 10' 14' GRAND AVE

PALOMA DR
48'
8' 5' 5' 8'
22' 15' 18'
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2021-185_GRAND_SHT-Opt2 - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:08 PM Plotstyle table: ALTA NCS Standard.stb PLAN 2A SCALE: 1" = 40' PLAN 2B SCALE: 1" = 40' MATCHLINE - SEE SHEET 3 MATCHLINE - SEE BELOW LEFT
MATCHLINE - SEE ABOVE RIGHT 0 40' 80' Scale: 1" = 40'
MATCHLINE - SEE SHEET 1 INSTALL 4" SOLID WHITE STRIPE (37 FT) INSTALL 4" SOLID WHITE STRIPE (240 FT) INSTALL 4" SOLID WHITE STRIPE (287 FT) INSTALL 4" SOLID WHITE STRIPE (283 FT) INSTALL 4" SOLID WHITE STRIPE (410 FT) INSTALL 4" SOLID WHITE STRIPE (137 FT) INSTALL 4" SOLID WHITE STRIPE (156 FT) INSTALL 4" SOLID WHITE STRIPE (612 FT) INSTALL 6" SOLID WHITE STRIPE (37 FT) INSTALL 6" SOLID WHITE STRIPE (287 FT) INSTALL 6" SOLID WHITE STRIPE (240 FT) INSTALL 6" SOLID WHITE STRIPE (283 FT) INSTALL 6" SOLID WHITE STRIPE (137 FT) INSTALL 6" SOLID WHITE STRIPE (410 FT) INSTALL 6" SOLID WHITE STRIPE (612 FT) INSTALL 6" SOLID WHITE STRIPE (156 FT) DIRECTIVE PLAN GRAND AVENUE SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT 2 DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE. 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. 17 - 18
38'10' 40' 10'
8' 46'10'
8' GRAND AVE

HERMOSA ST
8' 8' 39' 10'
48'
5' 5'
5' 5' R=15' (TYP.) R=5' (TYP.) 90'
8' 10'
COLUMBIA ST GRAND AVE 87' 10'
8'
48'
5' 5' R=13' R=7' R=11' (TYP.)
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2021-185_GRAND_SHT-Opt2 - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:09 PM Plotstyle table: ALTA NCS Standard.stb PLAN 3A SCALE: 1" = 40' PLAN 3B SCALE: 1" = 40'

MATCHLINE - SEE BELOW LEFT
MATCHLINE - SEE ABOVE RIGHT 0 40' 80' Scale: 1" = 40'MATCHLINE - SEE SHEET 2 MATCHLINE - SEE SHEET 4 INSTALL 6" SOLID WHITE STRIPE (119 FT) INSTALL 4" SOLID WHITE STRIPE (86 FT) INSTALL 6" SOLID WHITE STRIPE (120 FT) INSTALL 4" SOLID WHITE STRIPE (90 FT) INSTALL 6" SOLID WHITE STRIPE (446 FT) INSTALL 4" SOLID WHITE STRIPE (417 FT) INSTALL 6" SOLID WHITE STRIPE (446 FT) INSTALL 4" SOLID WHITE STRIPE (414 FT) INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL WHITE FLEXIBLE DELINEATORS AROUND CURB EXTENSION- 10' O.C (TYP.) INSTALL ADDITIONAL WHITE FLEXIBLE DELINEATORS IN CENTER OF PARKING LANE ON BOTH ENDS OF CURB EXTENSIONS (TYP.) INSTALL WHITE FLEXIBLE DELINEATORS AROUND CURB EXTENSION- 10' O.C (TYP.) INSTALL ADDITIONAL WHITE FLEXIBLE DELINEATORS IN CENTER OF PARKING LANE ON BOTH ENDS OF CURB EXTENSIONS (TYP.) INSTALL 6" SOLID WHITE STRIPE (148 FT) INSTALL 4" SOLID WHITE STRIPE (227 FT) INSTALL 6" SOLID WHITE STRIPE (226 FT) INSTALL 4" SOLID WHITE STRIPE (147 FT) INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL NEW SIGN ON POST: R81(CA) R81A(CA) INSTALL NEW SIGN ON POST: R81(CA) R81B(CA) INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME DIRECTIVE PLAN GRAND AVENUE SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT 3 DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE. 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. (227 FT) (148 FT) 17 - 19

HERMOSA ST

FLORAL PARK

TERRACE
24' 60' 10' 3' 10' 10' 45'
6' 5' 10'
6'
24' 16' HERMOSA ST HERMOSA ST HERMOSA PL HILLSIDE RD 16' 24' 14' 34' 38' 46' (TYP.) R=30' 50' 24' 6' Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2021-185_GRAND_SHT-Opt2 - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:09 PM Plotstyle table: ALTA NCS Standard.stb PLAN 4B SCALE: 1" = 40' MATCHLINE - SEE SHEET 5 MATCHLINE - SEE BELOW LEFT MATCHLINE - SEE ABOVE RIGHT 0 40' 80' Scale: 1" = 40' MATCHLINE - SEE SHEET 3 PLAN 4A SCALE: 1" = 40' INSTALL WHITE FLEXIBLE DELINEATORS - 10' O.C (TYP.) INSTALL 4" SOLID DOUBLE YELLOW STRIPE (TYP.) INSTALL CHANNELIZING ISLAND AND WHITE CHEVRON MARKING - 7' O.C. 4" WHITE INSTALL STOP BAR AND "STOP" PAVEMENT MARKING (TYP.) INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL WHITE FLEXIBLE DELINEATORS AROUND CURB EXTENSION- 10' O.C (TYP.) REMOVE CENTERLINE STRIPING FROM THIS POINT NORTH TO COLUMBIA ST INSTALL 6" SOLID WHITE STRIPE (458 FT) INSTALL ADDITIONAL WHITE FLEXIBLE DELINEATORS IN CENTER OF PARKING LANE ON BOTH ENDS OF CURB EXTENSIONS (TYP.) ERADICATE EXISTING STOP SYMBOLS AND STOP BARS INSTALL RED CURB DIRECTIVE PLAN HERMOSA STREET SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT 4 DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE. 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. 17 - 20

COLUMBIA ST

HILLSIDE RD

HERMOSA ST
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2021-185_GRAND_SHT-Opt2 - Directive Plans.dwg Last saved by: samanthahernandez Plot date: 7/11/2023 4:09 PM Plotstyle table: ALTA NCS Standard.stb PLAN 5 SCALE: 1" = 40' 0 40' 80' Scale: 1" = 40' MATCHLINE - SEE SHEET 4 INSTALL SLOW STREET INFORMATIONAL SIGN ON A-FRAME INSTALL 6" SOLID WHITE STRIPE (458 FT) INSTALL RED CURB DIRECTIVE PLAN HERMOSA STREET SOUTH PASADENA SLOW STREETS PROGRAM, DEMONSTRATION PROJECT 5 MATERIAL SPECIFICATIONS AND GENERAL NOTES: 1. REMOVE, ERADICATE, OR COVER ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS PRIOR TO INSTALLATION 2. STREET WIDTHS SHOWN ARE APPROXIMATE 3. ALL STRIPING IS 4" UNLESS OTHERWISE NOTED. 4. ALL SIGNING AND STRIPING SHALL CONFORM TO AND BE INSTALLED PER CALTRANS 2018 STANDARD PLANS, SPECIFICATIONS, AND CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 5. CLEAN THE ROADWAY SURFACE OF ANY DEBRIS BEFORE INSTALLATION. 6. FOLLOW MANUFACTURER'S SPECIFICATIONS FOR INSTALLATION. 7. IF REMOVABLE TRAFFIC TAPE IS USED, IT SHALL BE NON-SLIP, RETRO-REFLECTIVE, AND FOLLOW CITY STANDARDS. 8. FOR LONGER-TERM PILOT PROJECTS, INTENDED TO BE IN PLACE OVER ONE MONTH, MORE DURABLE ACRYLIC PAINT IS RECOMMENDED IN HIGH TRAFFIC AREAS. HOWEVER, REMOVAL MAY REQUIRE SPECIAL EQUIPMENT. 9. FLEXIBLE DELINEATOR POSTS SHOULD BE SURFACE-MOUNTED. ONE OPTION COULD BE ADHESIVE BUTYL PADS. 10. REPLACE ANY FLEXIBLE DELINEATOR POSTS THAT BREAK OR ARE REMOVED. REGULARLY CHECK THAT POSTS HAVE NOT BEEN DAMAGED, MOVED, OR REMOVED. 11. REFRESH OR REPLACE ANY PAINT, STENCIL, OR TRAFFIC TAPE THAT MAY HAVE BEEN REMOVED OR FADED. 12. ADA ACCESS MUST BE MAINTAINED WITH ANY CHANGES MADE WITHIN THE PROJECT RIGHT OF WAY. 13. ALL MATERIALS USED TO DELINEATE THE ROADWAY INCLUDING FLEXIBLE DELINEATORS AND PAVEMENT MARKINGS SHALL HAVE RETRO REFLECTIVE PROPERTIES TO ENHANCE NIGHTTIME VISIBILITY. DESIGNED BY: ASHLEY HAIRE, CA PE #C81212 APPROVED BY: CITY OF SOUTH PASADENA ______________________________________ (SIGNATURE) ______________________________________ (PRINTED NAME) FOR TEMPORARY INSTALLATION ONLY NOT FOR PERMANENT CONSTRUCTION 2022 17 - 21

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 22
ATTACHMENT 2
Residential Slow Streets Survey Responses Summary
17 - 23

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 24
South Pasadena Slow Streets | Residential Survey
1 / 63

98.65% 731

1.08% 8

0.27% 2
Q1 What Language would you like to take the survey in?
Answered: 741 Skipped: 3
TOTAL 741
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
English
Spanish -
Español
Chinese - 中国人

ANSWER CHOICES RESPONSES
English
Spanish - Español
Chinese - 中国人
17 - 25
South Pasadena Slow Streets | Residential Survey
2 / 63

90.55% 479

16.26% 86

35.92% 190
Q2 Select all that apply.

Answered: 529 Skipped: 215
Total Respondents: 529
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
I live in
South Pasadena
I work in
South Pasadena
I visit/shop
in South...

ANSWER CHOICES RESPONSES
I live in South Pasadena
I work in South Pasadena
I visit/shop in South Pasadena
17 - 26
South Pasadena Slow Streets | Residential Survey
3 / 63

92.44% 489

53.69% 284

22.31% 118

94.52% 500

20.60% 109

2.65% 14
Q3 Which of the following modes of transportation do you use to get around South Pasadena? Select all that apply.

Answered: 529 Skipped: 215
Total Respondents: 529
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Walk
Bike
Public
transportation
Car / truck
Ride Share
(Uber / Lyft)
Other (please
specify)

ANSWER CHOICES RESPONSES
Walk
Bike
Public transportation
Car / truck
Ride Share (Uber / Lyft)
Other (please specify)
17 - 27
South Pasadena Slow Streets | Residential Survey
4 / 63

85.20% 449

42.69% 225

86.34% 455

2.47% 13

7.02% 37

2.47% 13
Q4 Which of the following modes of transportation have you used on Oak / Hermosa / Grand after the project was installed? Select all that apply.

Answered: 527 Skipped: 217
Total Respondents: 527
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Walking
Bicycling
Driving (a
car/truck)
Public Transit
Scooting /
Skating
Other (please
specify)

ANSWER CHOICES RESPONSES
Walking
Bicycling
Driving (a car/truck)
Public Transit
Scooting / Skating
Other (please specify)
17 - 28
South Pasadena Slow Streets | Residential Survey
5 / 63
Q5 How has the demonstration project influenced the behavior of people using these streets? Please explain and specify which corridor you are focusing on.

Answered: 505 Skipped: 239
17 - 29
South Pasadena Slow Streets | Residential Survey
6 / 63
Q6 Overall, how do you think the demonstration strategies have impacted each corridor? Please only reply to corridors you have experienced firsthand.

Answered: 525 Skipped: 219

48.61%
227

16.06%
75 35.33%
165 467

48.59%
172

19.21%
68 32.20%
114 354

46.73%
150

20.25%
65 33.02%
106 321
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Better/Safer About the s… Worse/Les…
Oak Street
Grand Ave
Hermosa Ave

BETTER/SAFER ABOUT THE SAME WORSE/LESS SAFE TOTAL
Oak Street
Grand Ave
Hermosa Ave
17 - 30
South Pasadena Slow Streets | Residential Survey
7 / 63

49.34% 260

39.66% 209

11.01% 58
Q7 Would you like the City of South Pasadena to temporarily demonstrate the use of traffic safety tools on any other streets?
Answered: 527 Skipped: 217
TOTAL 527
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Yes
No
Don’t know

ANSWER CHOICES RESPONSES
Yes
No
Don’t know
17 - 31
South Pasadena Slow Streets | Residential Survey
8 / 63

62.14% 325

31.93% 167

73.42% 384

2.87% 15

1.72% 9

0.57% 3
Q8 How did you arrive to the demonstration project?
Answered: 523 Skipped: 221
Total Respondents: 523
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Automobile
Bike
Walk
Other wheeled
device
Transit (Rail)
Transit (Bus)

ANSWER CHOICES RESPONSES
Automobile
Bike
Walk
Other wheeled device
Transit (Rail)
Transit (Bus)
17 - 32
South Pasadena Slow Streets | Residential Survey
9 / 63

1.77% 9

3.94% 20

8.86% 45

0.20% 1

88.19% 448
Q9 If you used Metro (bus, rail) for transportation to the demonstration project, how did you access Metro today?
Answered: 508 Skipped: 236
Total Respondents: 508
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Automobile
Bike
Walk
Other wheeled
device
n/a

ANSWER CHOICES RESPONSES
Automobile
Bike
Walk
Other wheeled device
n/a
17 - 33
South Pasadena Slow Streets | Residential Survey
10 / 63

28.00% 147

50.86% 267

15.05% 79

4.19% 22

1.90% 10
Q10 Do you ever ride Metro? (i.e. rail, bus)
Answered: 525 Skipped: 219
TOTAL 525
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Never
Less than once
a month
Several times
a month
Several times
a week
Daily

ANSWER CHOICES RESPONSES
Never
Less than once a month
Several times a month
Several times a week
Daily
17 - 34
South Pasadena Slow Streets | Residential Survey
11 / 63

14.26% 75

66.92% 352

4.75% 25

14.07% 74
Q11 After the demonstration project, your use of transit is likely to:

Answered: 526 Skipped: 218
TOTAL 526
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Increase
Stay the same
Decrease
Don't know

ANSWER CHOICES RESPONSES
Increase
Stay the same
Decrease
Don't know
17 - 35
South Pasadena Slow Streets | Residential Survey
12 / 63

8.86% 46

3.08% 16

16.57% 86

7.51% 39

63.97% 332
Q12 After the demonstration project, how likely are you to walk in your neighborhood? (Please rank on a scale of 1-5 with 1 being least likely and 5 being most likely.)
Answered: 519 Skipped: 225
TOTAL 519
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
1 2
3 4
5 ANSWER CHOICES RESPONSES
1 2
3 4
5 17 - 36
South Pasadena Slow Streets | Residential Survey
13 / 63

47.83% 253

43.67% 231

8.51% 45
Q13 Do you perceive this demonstration as improving this neighborhood/community?
Answered: 529 Skipped: 215
TOTAL 529
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Yes
No
Don’t know

ANSWER CHOICES RESPONSES
Yes
No
Don’t know
17 - 37
South Pasadena Slow Streets | Residential Survey
14 / 63

55.98% 295

44.02% 232
Q14 Would you like to see future demonstrations in your neighborhood? Answered: 527 Skipped: 217
TOTAL 527
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Yes
No

ANSWER CHOICES RESPONSES
Yes
No
17 - 38
South Pasadena Slow Streets | Residential Survey
15 / 63

25.58% 88

20.93% 72

9.88% 34

14.53% 50

29.07% 100
Q15 If yes, how often?
Answered: 344 Skipped: 400
TOTAL 344
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Yearly
2-5 times/year
6-10 times/year
Monthly
Weekly

ANSWER CHOICES RESPONSES
Yearly
2-5 times/year
6-10 times/year
Monthly
Weekly
17 - 39
South Pasadena Slow Streets | Residential Survey
16 / 63
Q16 Did you (or do you plan to) buy any food or drinks near the demonstration project?
Answered: 441 Skipped: 303
17 - 40
South Pasadena Slow Streets | Residential Survey
17 / 63
Q17 Did you (or do you plan to) shop at any local businesses near the demonstration project?
Answered: 442 Skipped: 302
17 - 41
South Pasadena Slow Streets | Residential Survey
18 / 63

1.54% 8

1.16% 6

19.85% 103

59.92% 311

17.53% 91
Q18 Age
Answered: 519 Skipped: 225
TOTAL 519
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Under 18
19-25
26-40
41-65
65-above

ANSWER CHOICES RESPONSES
Under 18
19-25
26-40
41-65
65-above
17 - 42
South Pasadena Slow Streets | Residential Survey
19 / 63

41.49% 217

52.58% 275

0.57% 3

5.35% 28
Q19 Gender
Answered: 523 Skipped: 221
TOTAL 523
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Male
Female
Non-binary/
third gender
Prefer not to
share

ANSWER CHOICES RESPONSES
Male
Female
Non-binary/ third gender
Prefer not to share
17 - 43
South Pasadena Slow Streets | Residential Survey
20 / 63

52.21% 272

0.96% 5

10.36% 54

10.36% 54

0.38% 2

0.00% 0

7.29% 38

18.43% 96
Q20 Ethnicity/Race
Answered: 521 Skipped: 223
TOTAL 521
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
White or
Caucasian
Black or
African...

Hispanic or
Latino
Asian or Asian
American
American
Indian or...

Native
Hawaiian or...

Multi-Ethnic
Decline to
state

ANSWER CHOICES RESPONSES
White or Caucasian
Black or African American
Hispanic or Latino
Asian or Asian American
American Indian or Alaska Native
Native Hawaiian or other Pacific Islander
Multi-Ethnic
Decline to state
17 - 44
South Pasadena Slow Streets | Residential Survey
21 / 63
100.00% 256
Q21 If you would like updates on this demonstration project including a summary of the evaluation results, please provide an email address here:

Answered: 256 Skipped: 488
TOTAL 256
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
No thank you

ANSWER CHOICES RESPONSES
No thank you
17 - 45
South Pasadena Slow Streets | Residential Survey
22 / 63
100.00% 5

0.00% 0

0.00% 0
Q22 Seleccione todas las que correspondan.

Answered: 5 Skipped: 739
TOTAL 5
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Yo vivo en el
sur de pasadena
Yo trabajo en
el sur de...

Visito/compro
en South...

ANSWER CHOICES RESPONSES
Yo vivo en el sur de pasadena
Yo trabajo en el sur de pasadena
Visito/compro en South Pasadena
17 - 46
South Pasadena Slow Streets | Residential Survey
23 / 63

50.00% 3

0.00% 0

16.67% 1

0.00% 0

0.00% 0

33.33% 2
Q23 ¿Cuál de los siguientes medios de transporte utiliza para desplazarse por South Pasadena? Seleccione todas las que correspondan.

Answered: 6 Skipped: 738
TOTAL 6
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Caminando
En Bicicleta
En Transporte
público
En coche /
carro
En Viaje
compartido...

Otro (por
favor...

ANSWER CHOICES RESPONSES
Caminando
En Bicicleta
En Transporte público
En coche / carro
En Viaje compartido (Uber / Lyft)
Otro (por favor especifique)
17 - 47
South Pasadena Slow Streets | Residential Survey
24 / 63

16.67% 1

16.67% 1

16.67% 1

16.67% 1

0.00% 0

33.33% 2
Q24 ¿Cuál de los siguientes modos de transporte ha utilizado en Oak/Hermosa/Grand después de que se instaló el proyecto? Seleccione todas las que correspondan.

Answered: 6 Skipped: 738
TOTAL 6
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Caminando
En bicicleta
En coche/carro
Tránsito
público
Scooting /
Patinaje
Otro (por
favor...

ANSWER CHOICES RESPONSES
Caminando
En bicicleta
En coche/carro
Tránsito público
Scooting / Patinaje
Otro (por favor especifique)
17 - 48
South Pasadena Slow Streets | Residential Survey
25 / 63
Q25 ¿Cómo ha influido el proyecto de demostración en el comportamiento de las personas que usan estas calles? Explique y especifique en qué corredor se está enfocando.

Answered: 4 Skipped: 740
17 - 49
South Pasadena Slow Streets | Residential Survey
26 / 63
Q26 En general, ¿cómo cree que las estrategias de demostración han impactado en cada corredor? Responda solo a los corredores que haya experimentado
Answered: 6 Skipped: 738

33.33%
2 16.67%
1 50.00%
3 6 2.17

33.33%
1 0.00%
0 66.67%
2 3 2.33

33.33%
1 0.00%
0 66.67%
2 3 2.33
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Mejor Mas o men… Peor
Oak St
Grand Ave
Hermosa Ave

MEJOR MAS O MENOS IGUAL PEOR TOTAL WEIGHTED AVERAGE
Oak St
Grand Ave
Hermosa Ave
17 - 50
South Pasadena Slow Streets | Residential Survey
27 / 63

83.33% 5

16.67% 1

0.00% 0
Q27 ¿Le gustaría que la ciudad de South Pasadena demostrara temporalmente el uso de herramientas de seguridad vial en otras calles? Answered: 6 Skipped: 738
TOTAL 6
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Sí
No
No sé

ANSWER CHOICES RESPONSES
Sí
No
No sé
17 - 51
South Pasadena Slow Streets | Residential Survey
28 / 63
Q28 Si respondió si, ¿puede enumerar otras calles que crea que serían buenas candidatas para futuras manifestaciones?
Answered: 4 Skipped: 740
17 - 52
South Pasadena Slow Streets | Residential Survey
29 / 63

0.00% 0

0.00% 0
100.00% 4

0.00% 0

0.00% 0

0.00% 0
Q29 ¿Cómo llegaste al proyecto de demostración?
Answered: 4 Skipped: 740
TOTAL 4
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
En coche/carro
En Bicicleta
Caminando
Otro
dispositivo ...

Tránsito
(Ferrocarril)
Tránsito
(Autobús)

ANSWER CHOICES RESPONSES
En coche/carro
En Bicicleta
Caminando
Otro dispositivo con ruedas
Tránsito (Ferrocarril)
Tránsito (Autobús)
17 - 53
South Pasadena Slow Streets | Residential Survey
30 / 63

0.00% 0

0.00% 0

25.00% 1

0.00% 0

75.00% 3
Q30 Si usó Metro (autobús, tren) para el transporte al proyecto de demostración, ¿cómo accedió a Metro hoy?
Answered: 4 Skipped: 740
TOTAL 4
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Automóvil
Bicicleta
Caminar
Otro
dispositivo ...
n / A

ANSWER CHOICES RESPONSES
Automóvil
Bicicleta
Caminar
Otro dispositivo con ruedas
n / A
17 - 54
South Pasadena Slow Streets | Residential Survey
31 / 63

40.00% 2

60.00% 3

0.00% 0

0.00% 0

0.00% 0
Q31 ¿Que Sequido z viajas en metro? (es decir, tren, autobús) Answered: 5 Skipped: 739
TOTAL 5
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Nunca
Menos de una
vez al mes
Varias veces
al mes
Varias veces a
la semana
Diario

ANSWER CHOICES RESPONSES
Nunca
Menos de una vez al mes
Varias veces al mes
Varias veces a la semana
Diario
17 - 55
South Pasadena Slow Streets | Residential Survey
32 / 63

40.00% 2

20.00% 1

0.00% 0

40.00% 2
Q32 Después del proyecto de demostración, es probable que su uso del transporte público:

Answered: 5 Skipped: 739
TOTAL 5
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Aumentar
Seguira igual
Disminuir
No sé

ANSWER CHOICES RESPONSES
Aumentar
Seguira igual
Disminuir
No sé
17 - 56
South Pasadena Slow Streets | Residential Survey
33 / 63

16.67% 1

0.00% 0

16.67% 1

16.67% 1

50.00% 3
Q33 Después del proyecto de demostración, ¿qué tan probable es que camine en su vecindario? (Por favor, califique en una escala de 1 a 5, siendo 1 la menos probable y 5 la más probable).

Answered: 6 Skipped: 738
TOTAL 6
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
1 2
3 4
5 ANSWER CHOICES RESPONSES
1 2
3 4
5 17 - 57
South Pasadena Slow Streets | Residential Survey
34 / 63

50.00% 3

16.67% 1

33.33% 2
Q34 ¿Percibe esta demostración como una mejora para este vecindario/comunidad?
Answered: 6 Skipped: 738
TOTAL 6
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Sí
No
No sé

ANSWER CHOICES RESPONSES
Sí
No
No sé
17 - 58
South Pasadena Slow Streets | Residential Survey
35 / 63

66.67% 4

33.33% 2
Q35 ¿Le gustaría ver futuras manifestaciones en su vecindario? Answered: 6 Skipped: 738
TOTAL 6
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Sí
No

ANSWER CHOICES RESPONSES
Sí
No
17 - 59
South Pasadena Slow Streets | Residential Survey
36 / 63

25.00% 1

25.00% 1

0.00% 0

25.00% 1

25.00% 1
Q36 En caso afirmativo, ¿con qué frecuencia?
Answered: 4 Skipped: 740
TOTAL 4
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Anualmente
2-5 veces/año
6-10 veces/año
Mensualmente
Semanalmente

ANSWER CHOICES RESPONSES
Anualmente
2-5 veces/año
6-10 veces/año
Mensualmente
Semanalmente
17 - 60
South Pasadena Slow Streets | Residential Survey
37 / 63
Q37 ¿Compraste (o planeas comprar) alimentos o bebidas cerca del proyecto de demostración?
Answered: 3 Skipped: 741
17 - 61
South Pasadena Slow Streets | Residential Survey
38 / 63
Q38 ¿Compraste (o planeas comprar) en negocios locales cerca del proyecto de demostración?
Answered: 3 Skipped: 741
17 - 62
South Pasadena Slow Streets | Residential Survey
39 / 63

0.00% 0

0.00% 0

20.00% 1

60.00% 3

20.00% 1
Q39 Edad
Answered: 5 Skipped: 739
TOTAL 5
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Menores de 18
años
19-25
26-40
41-65
65-más

ANSWER CHOICES RESPONSES
Menores de 18 años
19-25
26-40
41-65
65-más
17 - 63
South Pasadena Slow Streets | Residential Survey
40 / 63

20.00% 1

80.00% 4

0.00% 0

0.00% 0
Q40 Género
Answered: 5 Skipped: 739
TOTAL 5
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Masculino
Femenino
No binario /
tercer género
Prefiero no
compartir

ANSWER CHOICES RESPONSES
Masculino
Femenino
No binario / tercer género
Prefiero no compartir
17 - 64
South Pasadena Slow Streets | Residential Survey
41 / 63

20.00% 1

0.00% 0

60.00% 3

0.00% 0

0.00% 0

0.00% 0

0.00% 0

20.00% 1
Q41 Etnicidad / raza
Answered: 5 Skipped: 739
TOTAL 5
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Blanco o
caucásico
negro o
afroamericano
hispano o
latino
asiático o
asiático...

Indio
americano o...

Nativo de
Hawai u otra...

Multiétnico
Prefiero no
compartir

ANSWER CHOICES RESPONSES
Blanco o caucásico
negro o afroamericano
hispano o latino
asiático o asiático americano
Indio americano o nativo de Alaska
Nativo de Hawai u otra isla del Pacífico
Multiétnico
Prefiero no compartir
17 - 65
South Pasadena Slow Streets | Residential Survey
42 / 63
Q42 (opcional) Si desea actualizaciones sobre este proyecto de demostración, incluido un resumen de los resultados de la evaluación, proporcione una dirección de correo electrónico aquí
Answered: 2 Skipped: 742
17 - 66
South Pasadena Slow Streets | Residential Survey
43 / 63

50.00% 1

0.00% 0

50.00% 1
Q43 选择所有符合条件的。
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
我住在南帕萨迪纳
我在南帕萨迪纳工作
南帕萨迪纳参观/购物

ANSWER CHOICES RESPONSES
我住在南帕萨迪纳
我在南帕萨迪纳工作
我在南帕萨迪纳参观/购物
17 - 67
South Pasadena Slow Streets | Residential Survey
44 / 63

50.00% 1

0.00% 0

0.00% 0

50.00% 1

0.00% 0

0.00% 0
Q44 您使用以下哪种交通方式游览南帕萨迪纳?选择所有符合条件的。
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
走
自行车
公共交通工具
汽车/卡车
拼车(Uber /
Lyft)
其他

ANSWER CHOICES RESPONSES
走
自行车
公共交通工具
汽车/卡车
拼车(Uber / Lyft)
其他
17 - 68
South Pasadena Slow Streets | Residential Survey
45 / 63

50.00% 1

50.00% 1

0.00% 0

0.00% 0

0.00% 0

0.00% 0
Q45 项目安装后,您在 Oak / Hermosa / Grand 上使用过以下哪种交通方
式?选择所有符合条件的。
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
步行
骑自行车
驾驶(汽车/卡车)
公共交通
滑板车/滑冰
其他

ANSWER CHOICES RESPONSES
步行
骑自行车
驾驶(汽车/卡车)
公共交通
滑板车/滑冰
其他
17 - 69
South Pasadena Slow Streets | Residential Survey
46 / 63
Q46 示范项目如何影响人们使用这些街道的行为?请解释并具体说明您关
注的是哪条走廊。
Answered: 2 Skipped: 742
17 - 70
South Pasadena Slow Streets | Residential Survey
47 / 63
Q47 总体而言,您认为示范策略对每个走廊有何影响?请仅回复您亲身经
历过的走廊。
Answered: 2 Skipped: 742

0.00%
0 50.00%
1 50.00%
1 2

50.00%
1 0.00%
0 50.00%
1 2

0.00%
0 100.00%
2 0.00%
0 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
更好/更安全 差不多 更糟糕/不…
Oak Street
Grand Ave
Hermosa Ave
更好/更安全 差不多 更糟糕/不太安全 TOTAL
Oak Street
Grand Ave
Hermosa Ave
17 - 71
South Pasadena Slow Streets | Residential Survey
48 / 63

50.00% 1

50.00% 1

0.00% 0
Q48 您是否希望南帕萨迪纳市在其他街道上临时演示交通安全工具的使
用?
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
是的
不
不知道

ANSWER CHOICES RESPONSES
是的
不
不知道
17 - 72
South Pasadena Slow Streets | Residential Survey
49 / 63
Q49 如果是,您能否列出您认为适合未来示威的其他街道
Answered: 1 Skipped: 743
17 - 73
South Pasadena Slow Streets | Residential Survey
50 / 63

0.00% 0

50.00% 1

50.00% 1

0.00% 0

0.00% 0

0.00% 0
Q50 您是如何参与示范项目的?
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
汽车
自行车
走
其他轮式装置
交通(铁路)
交通(巴士)

ANSWER CHOICES RESPONSES
汽车
自行车
走
其他轮式装置
交通(铁路)
交通(巴士)
17 - 74
South Pasadena Slow Streets | Residential Survey
51 / 63

0.00% 0

0.00% 0

50.00% 1

0.00% 0

50.00% 1
Q51 如果您乘坐地铁(公交车、铁路)前往示范项目,您今天是如何乘坐
地铁的?
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
汽车
自行车
走
其他轮式装置
不适用

ANSWER CHOICES RESPONSES
汽车
自行车
走
其他轮式装置
不适用
17 - 75
South Pasadena Slow Streets | Residential Survey
52 / 63

0.00% 0

50.00% 1

50.00% 1

0.00% 0

0.00% 0
Q52 你坐过地铁吗? (即铁路、公共汽车)
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
绝不
每月少于一次
一个月几次
一周几次
日常的

ANSWER CHOICES RESPONSES
绝不
每月少于一次
一个月几次
一周几次
日常的
17 - 76
South Pasadena Slow Streets | Residential Survey
53 / 63

50.00% 1

50.00% 1

0.00% 0

0.00% 0
Q53 示范项目结束后,您对交通的使用可能会:
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
增加
保持原样
减少
不知道

ANSWER CHOICES RESPONSES
增加
保持原样
减少
不知道
17 - 77
South Pasadena Slow Streets | Residential Survey
54 / 63

0.00% 0

0.00% 0

0.00% 0

0.00% 0
100.00% 2
Q54 示范项目结束后,您在附近步行的可能性有多大? (请按照 1-5 的等
级进行排名,其中 1 是最不可能的,5 是最有可能的。)
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
1 2
3 4
5 ANSWER CHOICES RESPONSES
1 2
3 4
5 17 - 78
South Pasadena Slow Streets | Residential Survey
55 / 63

50.00% 1

50.00% 1

0.00% 0
Q55 您认为这次示威活动改善了这个街区/社区吗?
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
是的
不
不知道

ANSWER CHOICES RESPONSES
是的
不
不知道
17 - 79
South Pasadena Slow Streets | Residential Survey
56 / 63

50.00% 1

50.00% 1
Q56 您想在您的社区看到未来的示威活动吗?
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
是的
不

ANSWER CHOICES RESPONSES
是的
不
17 - 80
South Pasadena Slow Streets | Residential Survey
57 / 63
100.00% 1

0.00% 0

0.00% 0

0.00% 0

0.00% 0
Q57 如果是,多久一次?
Answered: 1 Skipped: 743
TOTAL 1
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
每年
2-5次/年
6-10次/年
每月
每周

ANSWER CHOICES RESPONSES
每年
2-5次/年
6-10次/年
每月
每周
17 - 81
South Pasadena Slow Streets | Residential Survey
58 / 63
Q58 您是否(或打算)在示范项目附近购买过任何食物或饮料吗?
Answered: 1 Skipped: 743
17 - 82
South Pasadena Slow Streets | Residential Survey
59 / 63
Q59 您是否(或打算)在示范项目附近的任何当地企业购物?
Answered: 1 Skipped: 743
17 - 83
South Pasadena Slow Streets | Residential Survey
60 / 63

0.00% 0

0.00% 0

50.00% 1

50.00% 1

0.00% 0
Q60 年龄
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
18岁以下
19-25日
26-40
41-65
65以上

ANSWER CHOICES RESPONSES
18岁以下
19-25日
26-40
41-65
65以上
17 - 84
South Pasadena Slow Streets | Residential Survey
61 / 63

50.00% 1

50.00% 1

0.00% 0

0.00% 0
Q61 性别
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
男性
女性
非二元/第三性别
宁愿不分享

ANSWER CHOICES RESPONSES
男性
女性
非二元/第三性别
宁愿不分享
17 - 85
South Pasadena Slow Streets | Residential Survey
62 / 63

0.00% 0

0.00% 0

0.00% 0

50.00% 1

0.00% 0

0.00% 0

0.00% 0

50.00% 1
Q62 民族/种族
Answered: 2 Skipped: 742
TOTAL 2
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
白人或白种人
黑人或非裔美国人
西班牙裔或拉丁裔
亚裔或亚裔美国人
人或阿拉斯加原住民
民或其他太平洋岛民
多民族
拒绝说明

ANSWER CHOICES RESPONSES
白人或白种人
黑人或非裔美国人
西班牙裔或拉丁裔
亚裔或亚裔美国人
美洲印第安人或阿拉斯加原住民
夏威夷原住民或其他太平洋岛民
多民族
拒绝说明
17 - 86
South Pasadena Slow Streets | Residential Survey
63 / 63
Q63 (可选)如果您想了解此演示项目的最新信息,包括评估结果摘要,
请在此处提供电子邮件地址:
Answered: 0 Skipped: 744
17 - 87

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 88
ATTACHMENT 3
Mission Parklet Design Draft Renderings
17 - 89

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 90
Task 7: Parklet | Furniture Design 18 OCTOBER 2023
17 - 91
Planters
Raised Planter
1 SOUTH PASADENA SLOW STREETS PROGRAM 2
18 OCTOBER 2023
Task 7: Parklet Design
Typ. Parklet Plan View
Existing Plaza
Bar Seating Cafe Seating
Shade Canopy
Group Seating
Bike Rack Bike Rack Bike Rack
E x i s t i n g
Crosswalk
17 - 92
1 SOUTH PASADENA SLOW STREETS PROGRAM 3
18 OCTOBER 2023
Task 7: Parklet Design
Isometric View
Bar Seating Area Cafe Seating Area
Optional Shade Structure
Group Seating Area R a i s e d P l a n t e r &
Bike Rack P l a n t e r s
Bike Rack
Existing Street Trees
17 - 93
1 SOUTH PASADENA SLOW STREETS PROGRAM 4
18 OCTOBER 2023
Task 7: Parklet Design
Street View Context
17 - 94
1 SOUTH PASADENA SLOW STREETS PROGRAM 5
18 OCTOBER 2023
Task 7: Parklet Design
Pre-Purchased Planters
Parkinsonia florida

PALO VERDE TREE
17 - 95
1 SOUTH PASADENA SLOW STREETS PROGRAM 6
18 OCTOBER 2023
Task 7: Parklet Design
Street View

SOUTH PASADENA - BIKE RACK
17 - 96
1 SOUTH PASADENA SLOW STREETS PROGRAM 7
18 OCTOBER 2023
Task 7: Parklet Design
GENERAL NOTES:
3/8” STEEL FRAME

HOT-DIP GALVANIZED

AND POWDER COAT
COLOR TO BE: SELECTED

ALL WELDED JOINTS TO BE BUTT

GRIND SMOOTH

CONTRACTOR TO PROVIDE ALL

NECESSARY CONNECTION
FASTNER’S / HARDWARE

WOOD FINISH TO BE KEBONY

OR THERMORY WOOD FINISH

PER SPECIFICATION

CONCRETE FINISH TO

MATCH COLOR OF

PRE-PURCHASED PLANTERS

SEE SPECIFICATION
USE 5/8” GALVANIZED

LAG SCREWS

W/ WASHER TO ATTACH

FURNITURE TO WOOD DECK

ALL FURNITURE TO BE FABRICATED,

TRANSPORTED AND INSTALLED ON
SITE PER CONTRACTOR.

GENERAL NOTES:

CONCRETE COUNTER TOPS TO MATCH

EXISTING POTTERY WHICH HAS BEEN

PURCHASED AND IS

AVAILABLE FOR REVIEW ON SITE
Pre-Purchased Planters
17 - 97
1 SOUTH PASADENA SLOW STREETS PROGRAM 8
18 OCTOBER 2023
Task 7: Parklet Design
Movable Planter Options
Kalanchoe-beharensis

ELEPHANT EAR PLANT
Kalanchoe-beharensis

ELEPHANT EAR PLANT
Acacia cognata

COUSIN ITT
Pennisetum sp.

LITTLE BUNNY
Stelitzia nicolai

GIANT BIRD OF PARADISE
17 - 98
1 SOUTH PASADENA SLOW STREETS PROGRAM 9
18 OCTOBER 2023
Task 7: Parklet Design
Strelitzia nicolai

GIANT BIRD OF PARADISE
Dracaena draco

DRAGON TREE
Casuarina glauca

COUSIN IT
Aloe 'hercules'

ALOE HERCULES TREE
Planter Options - Feature Planting
Aloe 'hercules'

ALOE HERCULES TREE
17 - 99
1 SOUTH PASADENA SLOW STREETS PROGRAM 10
18 OCTOBER 2023
Task 7: Parklet Design
Triangular Corner Planter - Detail

PLAN VIEW

PLANTER
4" DIA. DRAIN
HOLE TYP.

CROSS BRACE TYP.

CROSS BRACE TYP.
1" SQUARED OFF TOP
AT ALL PLANTERS TYP.

PLANTERS
17 - 100
1 SOUTH PASADENA SLOW STREETS PROGRAM 11
18 OCTOBER 2023
Task 7: Parklet Design
Triangular Corner Planter - Corrugated Steel

ISO VIEW

PLANTER

MILD STEEL METAL - HOT DIPPED PAINT

CONCEPT
PLANTER NOTES:

CONTRACTOR TO PROVIDE CUSTOM

METAL PLANTERS TO FIT WITHIN THE
K-RAIL AND CURB / STREET.

THREE SEPARATE PLANTERS WITH VARIED HEIGHTS

INTERIORS OF PLANTERS TO BE

WATERPROOFED WITH APPROVED MASTIC,
CONTRACTOR TO SUBMIT SAMPLE FOR APPROVAL.

MILD STEEL CONSTRUCTION

POWDER COAT FINISH
PAINT COLOR TO BE: SELECTED / APPROVED

ALL WELDED JOINTS TO BE BUTT

GRIND SMOOTH

PLANTERS TO BE RAISED OFF OF
STREET 3” MINIMUM TO ALLOW FOR
PROPER STREET DRAINAGE.

CONTRACTOR TO PROVIDE STEEL

RISERS TO SUPPORT PLANTERS
ABOVE STREET LEVEL.

CONTRACTOR TO PROVIDE 4" DIA.

DRAINAGE AND 1" DIA IRRIGATION HOLES.

ALL PLANTERS TO BE BOLTED TOGETHER.
17 - 101
1 SOUTH PASADENA SLOW STREETS PROGRAM 12
18 OCTOBER 2023
Task 7: Parklet Design
Triangular Corner Planter - Detail

ISO VIEW

PLANTER

TRIANGULAR PLANTER
17 - 102
1 SOUTH PASADENA SLOW STREETS PROGRAM 13
18 OCTOBER 2023
Task 7: Parklet Design
Hesperaloe parviflora

HESPER ALOE
Agave 'boutin blue'

BLUE FLAME AGAVE

ASSORTED SUCCULENTS
Calamagrostis-acutiflora

KARL-FOERSTER
Parkinsonia florida

PALO VERDE TREE
Stepped Corner Planter - Planting
Arbutus unedo

STRAWBERRY TREE
17 - 103
1 SOUTH PASADENA SLOW STREETS PROGRAM 14
18 OCTOBER 2023
Task 7: Parklet Design

K RAIL CAP

PLANTER
K-Rail Cap - Details

K RAIL CAP

PLANTER

PAINTED K-RAIL TO MATCH BLDG AWNINGS OPTIONAL STEEL PLANTERS @ K-RAIL
17 - 104
1 SOUTH PASADENA SLOW STREETS PROGRAM 15
18 OCTOBER 2023
Task 7: Parklet Design
Shade Canopy - Concept
17 - 105
1 SOUTH PASADENA SLOW STREETS PROGRAM 16
18 OCTOBER 2023
Task 7: Parklet Designxx
Shade Structure-Details

PLAN VIEW

SHADE STRUCTURE

ELEVATION

SHADE STRUCTURE
17 - 106
1 SOUTH PASADENA SLOW STREETS PROGRAM 17
18 OCTOBER 2023
Task 7: Parklet Design

SECTION

SHADE STRUCTURE
Shade Structure-Details

SHADE CONCEPT

CABLE TO WALL CONNECTION CABLE TO WALL CONNECTION
GENERAL NOTE:

CONTRACTOR TO SUPPLY / INSTALL

SUNBRELLA SHADE CLOTH PER

MANUFACTURES SPECIFICATION
17 - 107
1 SOUTH PASADENA SLOW STREETS PROGRAM 18
18 OCTOBER 2023
Task 7: Parklet Design
Bench-Detail

PLAN VIEW
BENCH

ELEVATION
BENCH
ISO
BENCH
GENERAL NOTES:
3/8” STEEL FRAME

HOT-DIP GALVANIZED

AND POWDER COAT
COLOR TO BE: SELECTED

ALL WELDED JOINTS TO BE BUTT

GRIND SMOOTH

CONTRACTOR TO PROVIDE ALL

NECESSARY CONNECTION
FASTNER’S / HARDWARE

WOOD FINISH TO BE KEBONY

OR THERMORY WOOD FINISH

PER SPECIFICATION

CONCRETE FINISH TO

MATCH COLOR OF

PRE-PURCHASED PLANTERS

SEE SPECIFICATION
USE 5/8” GALVANIZED

LAG SCREWS

W/ WASHER TO ATTACH

FURNITURE TO WOOD DECK
ALL FURNITURE TO BE FABRICATED, TRANSPORTED AND INSTALLED ON SITE PER CONTRACTOR. 17 - 108
1 SOUTH PASADENA SLOW STREETS PROGRAM 19
18 OCTOBER 2023
Task 7: Parklet Design

ELEVATION

STAND UP BAR
PLAN

STAND UP BAR
Stand Up Bar-Detail
17 - 109
1 SOUTH PASADENA SLOW STREETS PROGRAM 20
18 OCTOBER 2023
Task 7: Parklet Design
GENERAL NOTES:
3/8” STEEL FRAME

HOT-DIP GALVANIZED

AND POWDER COAT
COLOR TO BE: SELECTED

ALL WELDED JOINTS TO BE BUTT

GRIND SMOOTH

CONTRACTOR TO PROVIDE ALL

NECESSARY CONNECTION
FASTNER’S / HARDWARE

WOOD FINISH TO BE KEBONY

OR THERMORY WOOD FINISH

PER SPECIFICATION

CONCRETE FINISH TO

MATCH COLOR OF

PRE-PURCHASED PLANTERS

SEE SPECIFICATION
USE 5/8” GALVANIZED

LAG SCREWS

W/ WASHER TO ATTACH

FURNITURE TO WOOD DECK
ALL FURNITURE TO BE FABRICATED, TRANSPORTED AND INSTALLED ON SITE PER CONTRACTOR.

ISO

STAND UP BAR
GENERAL NOTE:

CONCRETE COUNTER TOPS TO MATCH

EXISTING POTTERY WHICH HAS BEEN

PURCHASED AND IS

AVAILABLE FOR REVIEW ON SITE
Stand Up Bar-Detail
17 - 110
1 SOUTH PASADENA SLOW STREETS PROGRAM 21
18 OCTOBER 2023
Task 7: Parklet Design
Stand Up Table-Detail

ELEVATION

STAND UP TABLE
PLAN

STAND UP TABLE
GENERAL NOTES:
3/8” STEEL FRAME

HOT-DIP GALVANIZED

AND POWDER COAT
COLOR TO BE: SELECTED

ALL WELDED JOINTS TO BE BUTT

GRIND SMOOTH

CONTRACTOR TO PROVIDE ALL

NECESSARY CONNECTION
FASTNER’S / HARDWARE

WOOD FINISH TO BE KEBONY

OR THERMORY WOOD FINISH

PER SPECIFICATION

CONCRETE FINISH TO

MATCH COLOR OF

PRE-PURCHASED PLANTERS

SEE SPECIFICATION
USE 5/8” GALVANIZED

LAG SCREWS

W/ WASHER TO ATTACH

FURNITURE TO WOOD DECK
ALL FURNITURE TO BE FABRICATED, TRANSPORTED AND INSTALLED ON SITE PER CONTRACTOR.

ISO

STAND UP TABLE
17 - 111
1 SOUTH PASADENA SLOW STREETS PROGRAM 22
18 OCTOBER 2023
Task 7: Parklet Design
Group Seating Concept
17 - 112
1 SOUTH PASADENA SLOW STREETS PROGRAM 23
18 OCTOBER 2023
Task 7: Parklet Design
PLAN

SQUARE SEAT

ELEVATION

SQUARE SEAT
Square Seat-Detail
ISO

SQUARE SEAT
GENERAL NOTES:
3/8” STEEL FRAME

HOT-DIP GALVANIZED

AND POWDER COAT
COLOR TO BE: SELECTED

ALL WELDED JOINTS TO BE BUTT

GRIND SMOOTH

CONTRACTOR TO PROVIDE ALL

NECESSARY CONNECTION
FASTNER’S / HARDWARE

WOOD FINISH TO BE KEBONY

OR THERMORY WOOD FINISH

PER SPECIFICATION

CONCRETE FINISH TO

MATCH COLOR OF

PRE-PURCHASED PLANTERS

SEE SPECIFICATION
USE 5/8” GALVANIZED

LAG SCREWS

W/ WASHER TO ATTACH

FURNITURE TO WOOD DECK
ALL FURNITURE TO BE FABRICATED, TRANSPORTED AND INSTALLED ON SITE PER CONTRACTOR. 17 - 113
1 SOUTH PASADENA SLOW STREETS PROGRAM 24
18 OCTOBER 2023
Task 7: Parklet Design
PLAN

RECTANGULAR TABLE

ELEVATION

RECTANGULAR TABLE
ISO

RECTANGULAR TABLE
Rectangular Table-Detail
GENERAL NOTES:
3/8” STEEL FRAME

HOT-DIP GALVANIZED

AND POWDER COAT
COLOR TO BE: SELECTED

ALL WELDED JOINTS TO BE BUTT

GRIND SMOOTH

CONTRACTOR TO PROVIDE ALL

NECESSARY CONNECTION
FASTNER’S / HARDWARE

WOOD FINISH TO BE KEBONY

OR THERMORY WOOD FINISH

PER SPECIFICATION

CONCRETE FINISH TO

MATCH COLOR OF

PRE-PURCHASED PLANTERS

SEE SPECIFICATION
USE 5/8” GALVANIZED

LAG SCREWS

W/ WASHER TO ATTACH

FURNITURE TO WOOD DECK
ALL FURNITURE TO BE FABRICATED, TRANSPORTED AND INSTALLED ON SITE PER CONTRACTOR.

STEEL SEATING - COLOR
17 - 114
1 SOUTH PASADENA SLOW STREETS PROGRAM 25
18 OCTOBER 2023
Task 7: Parklet Design
Group Seating Option

EXISTING GINGKO TREE - SUMMER EXISTING GINGKO TREE - FALL OPTIONAL STEEL PLANTERS @ K-RAIL STEEL SEATING
17 - 115
1 SOUTH PASADENA SLOW STREETS PROGRAM 26
18 OCTOBER 2023
Task 7: Parklet Design

IPE WOOD CLADDING THERMORY WOOD
Wood Specifications
17 - 116
1 SOUTH PASADENA SLOW STREETS PROGRAM 27
18 OCTOBER 2023
Task 7: Parklet Design

STEEL SEATING - COLOR
Hot Dipped Galvanised and Powder Coated Steel-Specifications 17 - 117
SOUTH PASADENA SLOW STREETS PROGRAM 28
17 - 118
18 OCTOBER 2023
ATTACHMENT 4
Mission Street Road Diet Previous Draft Design and Cross Section Exhibits
17 - 119

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 120

JOIN EXISTING STRIPING MISSION ST
ORANGE
GROVE AVE 95' TAPER 20' 10' 10' 20' INSTALL SIGN ON NEW POST: W4-2(L) INSTALL 6" YELLOW MEDIAN LINE (325 FT) INSTALL 6" WHITE LANE LINE (325 FT) INSTALL TYPE VI ARROW PAVEMENT MARKING INSTALL 4" YELLOW DIAGONAL STRIPE - 10' O.C. INSTALL TYPE VI ARROW PAVEMENT MARKING INSTALL SIGN ON NEW POST: W9-1(L) 3 EX. PARALLEL PARKING SPOTS 6 EX. PARALLEL PARKING SPOTS EX. BUS STOP SIGN

PROSPECT AVE MISSION ST
MERIDIAN AVE 9' 9' 20' TYP. EX. BUS STOP SIGN 8' 50' TAPER 12' 20' 11' 9' 11' 11' INSTALL 24" WIDE WHITE CROSSWALK MARKINGS TO CREATE LADDER CROSSWALK INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C INSTALL 8" SOLID WHITE STRIPE (85 FT) R30' 55' TAPER INSTALL 6" YELLOW MEDIAN LINE (55 FT) INSTALL 6" WHITE LANE LINE (55 FT) INSTALL 6" YELLOW MEDIAN LINE (212FT) INSTALL 6" WHITE LANE LINE (180 FT) INSTALL 6" YELLOW MEDIAN LINE (43 FT) INSTALL 8" SOLID WHITE STRIPE (38 FT) R4' R4' INSTALL 4" YELLOW DIAGONAL STRIPE - 10' O.C. 11' R20' 11' 10' 12' 8' 9' TYP. 14' 14' INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C INSTALL TYPE IV (LT) ARROW PAVEMENT MARKING (TYP.) 90' OPENING REMOVE EX. R32C(CA) SIGN INSTALL YELLOW FLEXIBLE DELINEATORS - 20' O.C. (TYP.) INSTALL 4" YELLOW DIAGONAL STRIPE - 10' O.C. INSTALL DOTTED WHITE LANE LINE EXTENSION (80FT) INSTALL 4" SOLID WHITE 45° STRIPE (20 FT) R220' R125' INSTALL YELLOW FLEXIBLE DELINEATORS - 20' O.C. (TYP.) INSTALL 6" SOLID DOUBLE YELLOW STRIPE (153 FT) Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2023-071_MISSION_SHT - Directive Plans.dwg Last saved by: taliaagazaryan Plot date: 9/25/2023 12:10 PM Plotstyle table: ALTA NCS Standard.stb NOT FOR CONSTRUCTION 1 PLAN MISSION STREET SOUTH PASADENA SLOW STREETS PROGRAM, CONCEPTUAL PLANS PLAN 1A SCALE: 1" = 40' PLAN 1B SCALE: 1" = 40' MATCHLINE - SEE BELOW LEFT 0 40' 80' Scale: 1" = 40'
MATCHLINE - SEE ABOVE RIGHT NOTES: 1. CONCEPTUAL HORIZONTAL GEOMETRY SHOWN. ROADWAY PAVEMENT MARKINGS, BARRIER TYPE, AND SURFACE MATERIALS FOR PARKLET AREAS TO BE DETERMINED BY CITY ENGINEER. 2. ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS SHALL BE REMOVED, ERADICATED, OR COVERED 3. ADA ACCESS MUST BE MAINTAINED WITH ANY CHANGES MADE WITHIN THE PROJECT RIGHT OF WAY EX. PARKLET LEGEND: PROP. PARKLET EX. STRIPING/MARKINGS MATCHLINE - SEE SHEET 2 MATCHLINE - SEE SHEET 3 60 ft (typical) (2 thru lanes + CLTL) 60 ft with 2 parklets (2 thru lanes + CLTL) 48-50 ft section at curb extensions (2 thru lanes + LT) 60 ft with 1 parklet (2 thru lanes + CLTL) 60 ft (typical) (4 vehicle lanes) 48-50 ft at curb extensions (4 vehicle lanes) 60 ft with 1 parklet (4 vehicle lanes) 60 ft (4 vehicle lanes) - Current condition 17 - 121

MISSION ST

DIAMOND AVE
FAIRVIEW AVE 7 EX. PARALLEL PARKING SPOTS 2 EX. PARALLEL PARKING SPOTS 2 EX. PARALLEL PARKING SPOTS INSTALL SIGN ON EX. POST: W73A(CA) (RT) 11' 18' 11' 8' INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. INSTALL 4" SOLID WHITE 45° STRIPE (20 FT) 50' 83' TAPER 13' 11' 14' 14'
9' TYP. 1 EX. PARALLEL PARKING SPOT 11'3' INSTALL 8" SOLID WHITE STRIPE (50 FT) INSTALL WHITE CHEVRON MARKING - 10' O.C (TYP.) INSTALL 6" YELLOW MEDIAN LINE (140 FT) INSTALL 8" WHITE LANE DROP STRIPE - DETAIL 37B (115 FT) INSTALL 6" YELLOW MEDIAN LINE (272 FT) INSTALL TYPE IV (RT) ARROW PAVEMENT MARKING (TYP.) INSTALL TYPE IV (LT) ARROW PAVEMENT MARKING (TYP.) INSTALL 8" SOLID WHITE STRIPE (27 FT) R25'
R25' INSTALL DOTTED WHITE LANE LINE EXTENSION (50FT) 60' OPENING 60' OPENING INSTALL DOTTED WHITE LANE LINE EXTENSION (53 FT) R25'
14' REMOVE EX. SIGNS: R32C(CA), R49(CA) REMOVE EX. R32C(CA) SIGN REMOVE EX. R32C(CA) SIGN 8' INSTALL 6" SOLID DOUBLE YELLOW STRIPE (110FT) RRFB RRFB RRFB RRFB INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. INSTALL 4" YELLOW DIAGONAL STRIPE - 10' O.C. INSTALL YELLOW FLEXIBLE DELINEATORS - 20' O.C. (TYP.) INSTALL 4" YELLOW DIAGONAL STRIPE - 10' O.C. INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL 4" SOLID WHITE 45° STRIPE (20 FT) INSTALL 8" SOLID WHITE STRIPE (50 FT) INSTALL SIGN ON EX. POST: R3-7R 20' TYP.

R60'
R60'
R25'
14' 13' 11' 11' 10' 65' TAPER 14'
16' 9' INSTALL 4" SOLID WHITE 45° STRIPE (20 FT) INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C.

R60' 11' 2' 50' 9'
30 30
FREMONT AVE 3 EX. PARALLEL PARKING SPOTS EX. BUS STOP SIGN RELOCATED BUS STOP 90' 21' 9' 11' 19' 16' 15' 8' 11' 13' 14'14' 53' TAPER 5 EX. PARALLEL PARKING SPOTS 3 EX. PARALLEL PARKING SPOTS 1 EX. PARALLEL PARKING SPOT 11' 15' R30' 54' INSTALL 8" SOLID WHITE STRIPE (95 FT) INSTALL WHITE CHEVRON MARKING - 10' O.C (TYP.) INSTALL 6" YELLOW MEDIAN LINE (105 FT) INSTALL "ONLY" PAVEMENT MARKING (TYP.) INSTALL 6" YELLOW TWO WAY LEFT TURN LANES (45 FT) INSTALL 8" SOLID WHITE STRIPE (69 FT) R8' INSTALL DOTTED WHITE LANE LINE EXTENSION (62 FT) 60' OPENING REMOVE EX. R32C(CA) SIGN 9'
TYP. INSTALL 4" YELLOW DIAGONAL STRIPE - 10' O.C. EX. BUS STOP SIGN INSTALL 6" YELLOW MEDIAN LINE (25 FT) INSTALL 4" YELLOW DIAGONAL STRIPE - 10' O.C. INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C INSTALL 6" YELLOW TWO WAY LEFT TURN LANES (248 FT) INSTALL 4" SOLID WHITE 45° STRIPE (20 FT) INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C. (TYP.) INSTALL 6" SOLID DOUBLE YELLOW STRIPE (95 FT) R150'
R50'
R50'
R50'
R60'
14'
Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2023-071_MISSION_SHT - Directive Plans.dwg Last saved by: taliaagazaryan Plot date: 9/25/2023 12:10 PM Plotstyle table: ALTA NCS Standard.stb NOT FOR CONSTRUCTION 2 PLAN MISSION STREET SOUTH PASADENA SLOW STREETS PROGRAM, CONCEPTUAL PLANS PLAN 1C SCALE: 1" = 40' PLAN 1D SCALE: 1" = 40'

MATCHLINE - SEE BELOW LEFT
0 40' 80' Scale: 1" = 40'
MATCHLINE - SEE ABOVE RIGHT MATCHLINE - SEE SHEET 1 NOTES: 1. CONCEPTUAL HORIZONTAL GEOMETRY SHOWN. ROADWAY PAVEMENT MARKINGS, BARRIER TYPE, AND SURFACE MATERIALS FOR PARKLET AREAS TO BE DETERMINED BY CITY ENGINEER. 2. ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS SHALL BE REMOVED, ERADICATED, OR COVERED 3. ADA ACCESS MUST BE MAINTAINED WITH ANY CHANGES MADE WITHIN THE PROJECT RIGHT OF WAY MATCHLINE - SEE SHEET 3 EX. PARKLET LEGEND: PROP. PARKLET EX. STRIPING/MARKINGS 4-ft bike lanes do not meet Caltrans' minimum requirements.

Not recommended to have outer lanes less than 11 ft on atruck route with buses, especially not next to a bike lane.These right turn lanes will be impacted by the bus stops oneach corner. 17 - 122
25 25 MISSION ST
MOUND AVE 7 EX. PARALLEL PARKING SPOTS 7 EX. PARALLEL PARKING SPOTS 1 EX. PARALLEL PARKING SPOT 14 EX. PARALLEL PARKING SPOTS 4 EX. PARALLEL PARKING SPOTS 2 EX. PARALLEL PARKING SPOTS 11' 8' 20' TYP. INSTALL SIGN ON EX. POST: W73A(CA) (LT) 11' 11' 11' 8' 13' 11' 11' 11' 8' INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C (TYP.) R200' R200' R7' R15' INSTALL 6" YELLOW MEDIAN LINE (95 FT) INSTALL 8" SOLID WHITE STRIPE (48 FT) INSTALL 8" SOLID WHITE STRIPE (51 FT) INSTALL 8" WHITE LANE DROP STRIPE - DETAIL 37B (165 FT) INSTALL 8" SOLID WHITE STRIPE (50 FT) INSTALL 8" SOLID WHITE STRIPE (50 FT) INSTALL 6" WHITE LANE LINE (236 FT) INSTALL TYPE IV (LT) ARROW PAVEMENT MARKING (TYP.) INSTALL TYPE I ARROW PAVEMENT MARKING (TYP.) INSTALL 8" SOLID WHITE STRIPE (44 FT) INSTALL 8" WHITE LANE DROP STRIPE - DETAIL 37B (183 FT) INSTALL 6" SOLID DOUBLE YELLOW STRIPE (337 FT) INSTALL 6" YELLOW TWO WAY LEFT TURN LANES (118 FT) REMOVE EX. 15-MIN PARKING SIGN INSTALL 4" YELLOW DIAGONAL STRIPE - 10' O.C. INSTALL YELLOW FLEXIBLE DELINEATORS - 20' O.C. (TYP.) INSTALL 4" SOLID WHITE STRIPE (24 FT) INSTALL 4" SOLID WHITE STRIPE (43 FT) INSTALL 6" SOLID DOUBLE YELLOW STRIPE (50 FT) 8' 11' 11' 11' 11' 8' 9' 11' 10.5' 10.5' 11'8'

FAIR OAKS AVE
MISSION ST 12' 14' INSTALL TYPE I ARROW PAVEMENT MARKING (TYP.) INSTALL 8" SOLID WHITE STRIPE (59 FT) INSTALL 8" SOLID WHITE STRIPE (54 FT) INSTALL 6" SOLID DOUBLE YELLOW STRIPE (59 FT) INSTALL "ONLY" PAVEMENT MARKING 11' 11' 11' 11' 8'8' 9' TYP. 22' TYP. 8' 13.5'14' INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C R40' INSTALL WHITE PARKING SPACE MARKINGS (TYP.) INSTALL 4" SOLID WHITE 45° STRIPE (19 FT) (TYP.) MERIDIAN AVE INSTALL 4" WHITE DIAGONAL STRIPE - 10' O.C Dwg filename: N:\Shared\PROJECTS\2023\00-2023-071 South Pasadena, CA Slow Streets Program\CAD\01_Plans\2023-071_MISSION_SHT - Directive Plans.dwg Last saved by: taliaagazaryan Plot date: 9/25/2023 12:10 PM Plotstyle table: ALTA NCS Standard.stb NOT FOR CONSTRUCTION 3 PLAN MISSION STREET SOUTH PASADENA SLOW STREETS PROGRAM, CONCEPTUAL PLANS PLAN 1E SCALE: 1" = 40' PLAN 1F SCALE: 1" = 40' MATCHLINE - SEE BELOW LEFT 0 40' 80' Scale: 1" = 40'
MATCHLINE - SEE SHEET 2 MATCHLINE - SEE ABOVE RIGHT NOTES: 1. CONCEPTUAL HORIZONTAL GEOMETRY SHOWN. ROADWAY PAVEMENT MARKINGS, BARRIER TYPE, AND SURFACE MATERIALS FOR PARKLET AREAS TO BE DETERMINED BY CITY ENGINEER. 2. ALL CONFLICTING PAVEMENT MARKINGS AND SIGNS SHALL BE REMOVED, ERADICATED, OR COVERED 3. ADA ACCESS MUST BE MAINTAINED WITH ANY CHANGES MADE WITHIN THE PROJECT RIGHT OF WAY PLAN 1G SCALE: 1" = 40' MATCHLINE - SEE SHEET 1 EX. PARKLET LEGEND: PROP. PARKLET EX. STRIPING/MARKINGS 4-ft bike lanes do not meet Caltrans' minimum requirements.Not recommended to have outer lanes less than 11 fton a truck route with buses, especially not next to abike lane.

Inadequate width to provide parking, parklet, and bike lanes.Maintaining traffic operations requires 4 travel lanes in thissection.Not recommended to have outer lanes less than 11 ft on atruck route with buses.

Current condition. Inadequate width for bike lanes.Maintaining traffic operations requires 4 travel lanes in thissection.Not recommended to have outer lanes less than 11 ft on atruck route with buses. 17 - 123

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 124
ATTACHMENT 5
Parklet K-Rail Trim & Coverings Facade Components
Fabrication Estimates
17 - 125

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 126
K-Rail Cap Trim: $3300 each
This unit will be built using ¼ steel strap, angle iron and tubing. All metal components will be sandblasted and powder coated with color TBD. The wood covering will be Thermory Ash, stained and sealed with UV protection. All mounting hardware will be galvanized concrete bolts.

K-Rail Cap Planter: $3800 each
This unit will be built using ¼ steel strap, angle iron and tubing. All metal components will be sandblasted and powder coated with color TBD. The wood covering will be Thermory Ash, stained and sealed with UV protection. All mounting hardware will be galvanized concrete bolts.

Does Not include planter boxes
K-Rail Transitions: ( K-Rail Cap) $2000n each
This unit will accommodate the angle connection of the K-Rails tying the specified Caps together on both ends. This unit will be built using ¼ steel strap, angle iron and tubing. All metal components will be sandblasted and powder coated with color TBD. The wood covering will be Thermory Ash, stained and sealed with UV protection. All mounting hardware will be galvanized concrete bolts.

K-Rail Transitions: ( K-Rail Planter) $2400 each
This unit will accommodate the angle connection of the K-Rails tying the specified Caps together on both ends. This unit will be built using ¼ steel strap, angle iron and tubing. All metal components will be sandblasted and powder coated with color TBD. The wood covering will be Thermory Ash, stained and sealed with UV protection. All mounting hardware will be galvanized concrete bolts.
17 - 127
Triangular Corner Planter: $7950 each Revised 10/18/23
The planter will have a heavy duty steel substructure with adjustable legs to accommodate any site. The floor of all three planter boxes will be elevated at a minimum of 3” from the street surface to allow proper drainage and protection of the asphalt street. The outer walls of the planters will be a smooth steel, sandblasted and powder coated with a color TDB. The planter will be attached to the K-Rails on one leading side with galvanized concrete bolts and bolted together as needed to make the entire planter monolithic. The elevated floor of the planter boxes will be fiberglass grating to assure longevity and drainage along with the structural integrity needed when soil and plants are added. One layer of heavy duty landscape cloth will be laid on top of the grating allowing the soil to compact and drain over the entire planter mitigating the possibility of excess hydrostatic pressure due to heavy rains or over watering. The interior walls of the planters will be sealed with Semco Waterproofing Membrane to protect the inner walls of the planters.

Does not include soil, plants, and trees or any type of irrigation system.

Shade Structure: $5800 each
The 4” steel posts that make up the support for the overhead cables will sleeve over a steel saddle that will be mounted to the K-rails with concrete bolts. The sleeve design will allow for the posts to be adjusted for height at each site. Stainless steel bolts will be used to secure the post/sleeve connections. All cable, turnbuckles, termination ends, and rings will be made of stainless steel. The mounting plates that will terminate the cables at the building will be made of steel and the proper attachment will be used based on the existing structure and the location of attachment. All steel components will be sandblasted and powder coated with color TBD. The 17 - 128
overhead Roman shade will be made of Sunbrella. The shade will have five reinforcing pockets with an aluminum bar and 10 stainless steel rings allowing for the shades to be installed and removed anytime.

Bench: $2500 each
This unit will be built using ⅜ steel strap and tubing. All metal components will be sandblasted and powder coated with color TBD. The wood covering will be Thermory Ash, stained and sealed with UV protection. All mounting hardware will be stainless steel tamper proof bolts.

Stand up Bar: $3500 each w/ $1800 top allowance
This unit will be built using ⅜ steel strap and tubing. All metal components will be sandblasted and powder coated with color TBD. The concrete top color and source is TBD. All mounting hardware will be stainless steel tamper proof bolts.

Stand up Table: $1980 each w/ $800 top allowance
This unit will be built using ⅜ steel strap and tubing. All metal components will be sandblasted and powder coated with color TBD. The concrete top color and source is TBD. All mounting hardware will be stainless steel tamper proof bolts.

Square Seat: $2300 each
This unit will be made of 12 gauge steel and tubing, sandblasted and powder coated with color TBD. The wood covering will be Thermory Ash, 17 - 129
stained and sealed with UV protection. All mounting hardware will be galvanized concrete bolts.

Rectangular Table: $5040 each w/ $2000 top allowance
This unit will be made of 12 gauge steel and tubing, sandblasted and powder coated with color TBD. The concrete top color and source is TBD.

All mounting hardware will be galvanized concrete bolts.

Triangular Corner Planter: $7950 each Revised 10/18/23
The planter will have a heavy duty steel substructure with adjustable legs to accommodate any site. The floor of all three planter boxes will be elevated at a minimum of 3” from the street surface to allow proper drainage and protection of the asphalt street. The outer walls of the planters will be a smooth steel, sandblasted and powder coated with a color TDB. The planter will be attached to the K-Rails on one leading side with galvanized concrete bolts and bolted together as needed to make the entire planter monolithic. The elevated floor of the planter boxes will be fiberglass grating to assure longevity and drainage along with the structural integrity needed when soil and plants are added. One layer of heavy duty landscape cloth will be laid on top of the grating allowing the soil to compact and drain over the entire planter mitigating the possibility of excess hydrostatic pressure due to heavy rains or over watering. The interior walls of the planters will be sealed with Semco Waterproofing Membrane to protect the inner walls of the planters.

Does not include soil, plants, and trees or any type of irrigation system. 17 - 130
ATTACHMENT 6
ProCast Products, Inc. K-Rail Manufacturer Quote and
Drawings
17 - 131

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 132

QUOTATION
Quantity Item Unit of MeItasemure Description Unit Price Amount

50.00 FT 704 10' STANDARD CONCRETE BARRIER, 51.00 2,550.00

PAINTED CUSTOM COLOR WITHOUT

LOOPS AND CONNECTING PIN

4.00 EA 706 5' CONCRETE BARRIER, PAINTED 325.00 1,300.00

CUSTOM COLOR, WITH OUT LOOPS

OR CONNECTION PIN

2.00 <Each>715 30 DEGREE CORNER, PAINTED 250.00 500.00

CUSTOM COLOR, WITHOUT LOOPS

1.00 <Each>300 BOOM TRUCK DELIVERY 1,100.00 1,100.00
(NON-TAXABLE): INCLUDES ONE
HOUR. ADDITIONAL STANDBY WILL
BE BILLED AT $250/HR.

1.00 <Each>300 BOOM TRUCK DELIVERY ADDITIONAL 250.00 250.00 HOUR FOR SETTING BARRIER.

Quote Number: 19559
Quote Date: Nov 17, 2023
Sales Rep
Quoted To:

Good Thru
12/17/23
Customer ID Payment Terms
Page:

PROSPECTIVE C.O.D. 300Brown
1 TOTAL 6,284.25
Sales Tax 584.25
Subtotal 5,700.00
P.O. Box 602
Highland, CA 92346
909-793-7602 fax 909-793-1283
Quoted For:

City of Pasadena Public Works Dept.

Att: Anteneh Tesfaye 626-460-6393
Painted Barrier

PASADENA, CA
www.procastproducts.com

DEAR PROSPECTIVE CUSTOMER
Accepted by ___________________________________________ Print name and title_____________________________________ This quotation is subject to Procast Products terms and conditions as posted on our website www.procastproducts.com and available upon request immediately via regular mail, fax, or email.

Details such as exact quantities,delivery start dates, outside delivery dates, pace of delivery, storage, and standby time, must be mutually agreed upon in writing attime and acceptance of order.

Deliveries must be scheduled 48 hours in advance or it may be subject to an additional fee.

All orders are subject to availability, credit approval, and acceptance by seller.

Quantities less than stated above are subject to revised pricing. 17 - 133
4'-10" (5'-0" /1.5M STANDARD END LOOPS FOR PIN CONNECTIONS NOTES: 1. Weight = Approx. 1,950 lbs per piece. 2. Laying lenght between connector pins is 5'-0". 3. "GAWK" screen hole is 1 1 2"Ø x12" deep or 3"Ø consult
factory when placing order. 4. Cured in accordance with 2010 Caltrans Standard Specifications Section 90-1.03B (2) 4"Ø LIFTING HOLES (1) BRIDGE POCKETS LAYING LENGTH SEE NOTE 2) (1) 1 1
2"Ø GAWK SCREEN HOLE x12" DEEP 1'-0" (TYP.) PROVIDE 2 SCUPPERS OF EQUAL SPACE PER 5' FOOT SECTION OF BARRIER (LOCATION- ±2") K-5F.M. 12/06/2017 -- TYPE K-5 1/2"=1'-0" -- B-003A g:\3 - standard products folder\new standard product drawings\barriers\barriers.dwg DRAWING NO. DRAWN BY: CHECKED BY: DESCRIPTION: PRODUCT NAME:

PO Box 602, Highland, CA 92346
909-793-7602 phone 909-793-1283 fax
www.procastproducts.com REVISED BY: SCALE: DESIGN SPECIFICATIONS PRO-CAST PRODUCTS RESERVES THE RIGHT TO MAKE CHANGES TO PRODUCT DESIGN AND/OR DIMENSIONS WITHOUT NOTICE. PLEASE CONTACT PRO-CAST PRODUCTS WHENEVER NECESSARY FOR CONFIRMATION OR ADVICE ON PRODUCT DESIGN. CONTENTS: Barrier Type K-5 ISOMETRIC ISOMETRIC SCALE: 1/2"=1'-0" 17 - 134
(2) 4" DIA. LIFTING HOLES STANDARD END LOOPS FOR PIN CONNECTIONS BRIDGE POCKETS 2'- 0'' 2'-8" 6" (1) 1 2"Ø GAWK SCREEN HOLE x12" DROP STANDARD END LOOPS FOR PIN CONNECTIONS (1) BRIDGE POCKET (2) 4"Ø LIFTING HOLES 4'-10" (5'-0" /1.5M LAYING LENGTH - SEE NOTE 2) PROVIDE 2 SCUPPERS OF EQUAL SPACE PER 5' FOOT SECTION OF BARRIER (LOCATION- ±2") K-5F.M. 12/06/2017 -- TYPE K-5 -- B-003B g:\3 - standard products folder\new standard product drawings\barriers\barriers.dwg DRAWING NO. DRAWN BY: CHECKED BY: DESCRIPTION: PRODUCT NAME:

PO Box 602, Highland, CA 92346
909-793-7602 phone 909-793-1283 fax
www.procastproducts.com REVISED BY: SCALE: DESIGN SPECIFICATIONS PRO-CAST PRODUCTS RESERVES THE RIGHT TO MAKE CHANGES TO PRODUCT DESIGN AND/OR DIMENSIONS WITHOUT NOTICE. PLEASE CONTACT PRO-CAST PRODUCTS WHENEVER NECESSARY FOR CONFIRMATION OR ADVICE ON PRODUCT DESIGN. CONTENTS: Barrier Type K-5 BARRIER END DETAIL SCALE: 3/4"=1'-0" K- 5 ELEVATION SCALE: 1/2"=1'-0" - END DETAIL - SIDE ELEVATION 17 - 135
17 - 136
ATTACHMENT 7
Proposed Fourth Amendment with Right of Way, Inc.
17 - 137

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 138

Page 1 of 2 ends

FOURTH AMENDMENT TO

AGREEMENT FOR SERVICES
THIS AMENDMENT (“Amendment”) is made on this 20th day of March 2024, by and between the CITY OF SOUTH PASADENA (“CITY”) and RIGHT OF WAY, INC. (“CONTRACTOR”).

RECITALS
WHEREAS, on August 19, 2020, the City Council approved an on-call contract with Right of Way, Inc., to provide concrete barriers for parking closures as part of the Al Fresco Dining and Retail Pilot Program on an as-needed basis; and WHEREAS, on August 18, 2021, the City Council approved the first amendment to the on-call contract with Right of Way, Inc., to extend the contract to August 19, 2022 and establish month-to-month unit costs for equipment and other services; and WHEREAS, on August 17, 2022, the City Council approved the second amendment to the on-call contract with Right of Way, Inc., to extend the contract to August 19, 2023 and establish month-to-month unit costs for equipment and other services; and
WHEREAS, on July 19, 2023, the City Council approved the third amendment to the on-call contract with Right of Way, Inc., to extend the contract to January 30, 2024 and establish month-to-month unit costs for equipment and other services; and WHEREAS, the Contractor has deployed barriers in conformity with the Agreement and the City desires to continue use of those barriers; and WHEREAS, the City and Contractor desire to extend the contract term to June 30, 2024 and increase the compensation for the extended use of the barriers; NOW, THEREFORE, THE CITY AND THE CONTRACTOR AGREE AS FOLLOWS:

1. PARAGRAPH 3.5 “Maximum Amount” is amended to read as follows: The total amount of compensation and costs payable to Consultant by the City under this Agreement is One-Hundred and Twenty-Two Thousand and FiveHundred ($122,500), which is comprised of Fifty Thousand ($50,000) for the original Scope of Services; Twenty-Five Thousand ($25,000) for the first extension of the contract term, ($25,000) for the second extension of the contract term, Fifteen Thousand ($15,000) for this third extension of the 17 - 139

Page 2 of 2 ends

contract term, and Seven Thousand and Five-hundred ($7,500) for this fourth extension of the contract term.

2. PARAGRAPH 3.7 “Termination Date” is amended to read: June 30, 2024, or when the work is satisfactory completed, whichever occurs first, or unless extended by a supplemental amendment.

3. PROVISIONS OF AGREEMENT. All other terms, conditions, and provisions of the Agreement to the extent not modified by this Amendment, shall remain in full force and effect.
“City”
City of South Pasadena
By:________________________________
Signature
Printed:_____________________________
Title:_______________________________
Date:______________________
“Contractor”
Right of Way, Inc.

By:______________________________
Signature
Printed:___________________________
Title:_____________________________
Date:______________________
Attest:

By:__________________________
Mark Perez, Deputy City Clerk
Date:________________________

Approved as to form:

By:___________________________
Roxanne Diaz, City Attorney

Date:________________________
17 - 140
ATTACHMENT 8
Master On-Call Services Agreement with Right of Way,
Inc. with Amendments
17 - 141

THIS PAGE

INTENTIONALLY

LEFT BLANK
17 - 142
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 143
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 144
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 145
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 146
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 147
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 148
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 149
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 150
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 151
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 152
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 153
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 154
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 155
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 156
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 157
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 158
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 159
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 160
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 161
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F 17 - 162
DocuSign Envelope ID: 1648ACA7-F352-4E91-AF61-24EBD64F2C1F Stephanie DeWolfe
09/10/2020
17 - 163
+608/325Ā,5914671Ā.+(Ā# "#)*-+Ȁ +-*Ȁ#-&$Ȁ'!% Ȁ%!+,%)#$-!-, DocuSign Envelope ID: F5CDA767-0641-4E20-BC37-D4C30DB51E72 17 - 164
Christina Muñoz
Acting Deputy City Clerk
Andrew Jared, City Attorney
+608/325Ā,5914671Ā.+(Ā# "#)*-+Ȁ +-*Ȁ#-&$Ȁ'!% Ȁ%!+,%)#$-!-, 


DocuSign Envelope ID: F5CDA767-0641-4E20-BC37-D4C30DB51E72 17 - 165
+608/325Ā,5914671Ā.+(Ā# "#)*-+Ȁ +-*Ȁ#-&$Ȁ'!% Ȁ%!+,%)#$-!-, DocuSign Envelope ID: F5CDA767-0641-4E20-BC37-D4C30DB51E72 17 - 166
17 - 167
17 - 168
DocuSign Envelope ID: 532CDCDE-81C0-42CC-A70A-C8C7B7ABC658 DocuSign Envelope ID: 6C34DAC7-C3EF-45F6-B429-AD362BFBB244 17 - 169
DocuSign Envelope ID: 532CDCDE-81C0-42CC-A70A-C8C7B7ABC658 DocuSign Envelope ID: 6C34DAC7-C3EF-45F6-B429-AD362BFBB244 9/19/2023
10/5/2023
City Manager
Armine Chaparyan
10/9/2023
17 - 170
18 18 - 1

THIS PAGE

INTENTIONALLY

LEFT BLANK
18 - 2
ATTACHMENT 1
August 17, 2022 - Regular City Council Meeting Minutes
18 - 3

THIS PAGE

INTENTIONALLY

LEFT BLANK
18 - 4
City of South Pasadena Page 1

CITY OF SOUTH PASADENA

CITY COUNCIL - REGULAR MEETING

M I N U T E S
WEDNESDAY, AUGUST 17, 2022, AT 7:00 P.M.

CALL TO ORDER:

The Regular Meeting of the South Pasadena City Council was called to order by Mayor Cacciotti on Wednesday, August 17, 2022, at 7:19 P.M. The City Council Chambers are located at 1424 Mission Street, South Pasadena, California.

ROLL CALL:

PRESENT Mayor Michael A. Cacciotti
Mayor Pro Tem Jon Primuth
Councilmember Jack Donovan
Councilmember Diana Mahmud
Councilmember Evelyn G. Zneimer
ABSENT None.

Yolanda Chavez, Interim Records Specialist, announced a quorum.

CITY STAFF PRESENT:

Arminé Chaparyan, City Manager; Andrew Jared, City Attorney; Yolanda Chavez, Interim Records Specialist and Tiara Solorzano, Administrative Secretary were present at Roll Call.

Other staff members presented reports or responded to questions as indicated in the minutes.

PLEDGE OF ALLEGIANCE
The Flag Salute was led by Councilmember Donovan.

CLOSED SESSION ANNOUNCEMENTS

1. CLOSED SESSION ANNOUNCEMENTS
August 17, 2022 Closed Session Meeting:

A. CONFERENCE WITH LEGAL COUNSEL: POTENTIAL LITIGATION
Government Code Section 54956.9(d)(2)
Number of Potential Cases: 1
18 - 5
Regular Meeting Minutes August 17, 2022

Page 2 ends

B. CONFERENCE WITH LEGAL COUNSEL: EXISTING LITIGATION
Government Code Section 54956.9(d)(1)

1. Case Name: Abbas v. City of South Pasadena, LASC Case No. 22STCV19084

2. Case Name: Contreras v. City of South Pasadena, LASC Case No 21STCV10065

3. Case Name: Snider v. City of South Pasadena, UPC Case No LA-CE-1180-M City Attorney Andrew Jared reported that City Council recessed into closed session at 5:09 P.M. will all members present. Direction was provided to staff and no reportable action taken. Council recessed from Closed Session at 7:03 P.M.

August 15, 2022, Closed Session Meeting:

A. CONFERENCE WITH LEGAL COUNSEL: EXISTING LITIGATION
(Government Code Section 54956.9(d)(1))

1. Californians for Homeownership, Inc. v. City of South Pasadena, (LASC Case No. 22STCP01388)

2. Californians for Homeownership, Inc. v. City of South Pasadena, (LASC Case No. 22STCP01161)
B. REAL PROPERTY NEGOTIATIONS
(Government Code Section 54956.8)

1. Property Address: 702 and 714 Mound Avenue
Agency Negotiator: Arminé Chaparyan, City Manager
Negotiating Party: Scott Hancock
Under Negotiation: Price and Terms
City Attorney Andrew Jared reported that City Council recessed into closed session at 10:00 A.M. will all members present. There was a motion on item A to settle the matter. The motion passed on a 4-0 vote. There were no further reportable actions taken. The City Attorney noted that there was a typographical error on property address for the Real Property Negotiations. The addresses that were discussed are 702 and 712 Mound Avenue.

PUBLIC COMMENT

2. PUBLIC COMMENT – GENERAL (NON-AGENDA ITEMS)
Zoom Public Comments:

Ella Hushagen commented on Just Cause Ordinance.

In-Person Comments:

Yvonne LaRose spoke regarding Title 7 and protected speech.

Ken Zanguill spoke regarding the accident that occurred on Marengo and Maple.

Cristian Ovalle spoke regarding the accident that occurred on Marengo and Maple. 18 - 6
Regular Meeting Minutes August 17, 2022

Page 3 ends

Felicia Yu spoke regarding the accident that occurred on Marengo and Maple.

Jeffrey Liter spoke regarding the accident that occurred on Marengo and Maple.

Shlomo Nitzani spoke regarding the community meeting on neighborhood watch.

Kay Mouradian spoke regarding the accident that occurred on Marengo and Maple.

3. STAFF RECOGNITION
City Manager’s Office: Cielo Frausto-Lupo
Community Development Department: Ben Jarvis
Community Services Department: Jonathan Smith
Fire Department: Colin Carson, Sam Benites, and Luis Vasquez Library Department: Kimberly Nguyen
Staff introduced the new employees to the City Council.

4. DEPARTMENT HIGHLIGHT VIDEO
Fire Department
Fire Chief Paul Riddle presented a Department Highlight Video.

5. PET ADOPTION – PASADENA HUMANE SOCIETY
The Pasadena Humane Society gave a presentation on their local pet adoption event.

COMMUNICATIONS

6. COUNCILMEMBER COMMUNICATIONS
Councilmember Mahmud spoke regarding the accident that occurred on Marengo and Maple and speeding throughout the city. She spoke regarding the City’s Water Conservation Fee and La Nina. She noted that she attended an inaugural event by the South Pasadena Senior Citizen Foundation with Mayor Cacciotti and Mayor Pro Tem Primuth. The Foundation awarded the inaugural senior champion award to Granville Thurman and Former Mayor Bob Joe.

Mayor Pro Tem Primuth spoke regarding the upcoming Finance Committee Ad Hoc report.

Councilmember Zneimer spoke regarding the “walk out ceremony” for Bob Bartell. She highlighted her attendance at the graduation ceremony for Eagle Scout Troop # 342 with Mayor Cacciotti. She attended the memorial services for Police Assistant Byron Salguero.

She highlighted the recent “Concerts in the Park” event.

Councilmember Donovan reported out from a recent Lease Properties Ad Hoc Committee meeting. The committee spoke about the batting cages, the awarding of a contract, and the

PRESENTATION
18 - 7
Regular Meeting Minutes August 17, 2022

Page 4 ends

tennis courts. The committee may bring a recommendation before the council in the near future.

Mayor Cacciotti made a motion, seconded by Councilmember Mahmud directing staff to review the city policy on the use of city facilities.

Mayor Cacciotti spoke regarding the Library’s children stories in the park program, which occurs every Saturday. He spoke regarding his volunteer work at the Holy Family Church Giving Bank. He spoke regarding the film “Far East Deep South”, which was shown at the library recently. He highlighted the recent “Concerts in the Park” event. He spoke regarding his recent meeting with the City of Pittsburgh on the City’s efforts converting commercial electric lawn equipment for our parks to all electric. He recognized Eagle Scout Troop # 342 on their recent graduation. He highlighted his meeting with Reverend Sam Park. He highlighted his attendance at the Boys’ Soccer Middle School coaching event with Coach Moro Zapatera. He highlighted the “walk out ceremony” for Bob Bartell. He highlighted his meeting with Assemblyman Holden regarding Housing Community Development. He spoke regarding an event held by Denise Menchaca who is a candidate for the San Gabriel City Council. He highlighted the inaugural event by the South Pasadena Senior Citizen Foundation with Councilmember Mahmud and Mayor Pro Tem Primuth.

7. CITY MANAGER COMMUNICATIONS
City Manager Chaparyan spoke regarding Monkeypox, COVID-19, and the Housing Element Community events.

8. REORDERING OF, ADDITIONS, OR DELETIONS TO THE AGENDA Item no. 5 was heard after Item no. 1. Item no. 17 and 16 were heard ahead of the Consent Calendar.

CONSENT CALENDAR
COUNCIL MOTION AND ACTION:

Councilmember Zneimer requested to pull Item No. 9 for separate discussion. Mayor Cacciotti requested to pull Item No. 10 for separate discussion. A motion was made by Councilmember Mahmud and seconded by Councilmember Zneimer to approve Consent Calendar Items Nos. 11-15 as modified by the additional documents. The motion carried 5-0, by the following vote:

AYES: Donovan, Mahmud, Primuth, Zneimer, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

9. APPROVAL OF PREPAID WARRANTS IN THE AMOUNT OF $358,194.89; GENERAL CITY WARRANTS IN THE AMOUNT OF $2,537,566.73; ONLINE PAYMENTS IN THE AMOUNT OF $115,527.81; TRANSFERS IN THE AMOUNT OF $125,815.27; VOIDS IN THE AMOUNT OF ($3,800.00); PAYROLL IN THE AMOUNT OF $2,799,490.53. 18 - 8
Regular Meeting Minutes August 17, 2022

Page 5 ends

Recommendation
It is recommended that the City Council approve the Warrants as presented.

Public Works Director Ted Gerber and Acting Management Services Director Belinda Varela responded to questions raised by the City Council.

COUNCIL MOTION AND ACTION:

Councilmember Zneimer requested to pull Item No. 9 for separate discussion. A motion was made by Councilmember Zneimer and seconded by Councilmember Mahmud to approve Item No. 9, as presented by staff. The motion carried 5-0, by the following vote:

AYES: Donovan, Mahmud, Primuth, Zneimer, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

10.MONTHLY INVESTMENT REPORT FOR JUNE 2022
Recommendation
It is recommended that the City Council receive and file the Monthly Investment Report for June 2022.

Finance Director Ken Louie responded to questions raised by the City Council.

COUNCIL MOTION AND ACTION:

Mayor Cacciotti requested to pull Item No. 10 for separate discussion. Hearing no objection, the report was received and filed.

11.PRESENTATION OF CITY COUNCIL MEETING MINUTES
Recommendation
It is recommended that the City Council approve the minutes as listed on the agenda and as presented.

A motion was made to approve recommendation on the Consent Calendar.

12.CITY RECOGNIZED HOLIDAY SCHEDULE
Recommendation
It is recommended that the City Council approve the City holiday closure schedule.

A motion was made to approve recommendation on the Consent Calendar.

13.JOB DESCRIPTION, CLASSIFICATION AND SALARY SCHEDULE CREATIONS,

UPDATES AND CORRECTIONS FOR VARIOUS POSITIONS
Recommendation
It is recommended that the City Council consider the following actions:

1. Approve the job description and salary schedule for the Permit Counter Technician and 18 - 9
Regular Meeting Minutes August 17, 2022

Page 6 ends

salary schedule for the Part Time Code Enforcement Officer positions;

2. Approve the reclassification of the Accounting Manager position to a Deputy Finance Director/Controller position, approve the job description and salary schedule, and appropriate $75,044 to Finance Department Salaries – Permanent Account 101-3010- 3011-7000-000 from General Fund Reserves;

3. Approve the correction to the salary schedule for Police Chief and Appropriate $913 to Police Department Salaries – Permanent Account 101-4010-4011-7000-000 from General Fund Reserves;

4. Approve the correction to the salary schedule for the Part-Time Community Services Coordinator and Appropriate $1,690 to the Community Services Department Salaries – Permanent Account 101-8030-8031-7000-000 from General Fund Reserves;

5. Approve a salary schedule adjustment for the Deputy City Manager classification and appropriate $19,599 to City Manager Department Salaries – Permanent Account 101- 2010- 2011-7000-000 from General Fund Reserves; and

6. Approve a revised job description for the Assistant to the City Manager classification.

A motion was made to approve recommendation on the Consent Calendar.

14.AUTHORIZE THE CITY MANAGER TO EXECUTE A SECOND CONTRACT AMENDMENT WITH RIGHT OF WAY, INC. TO EXTEND THE CONTRACT TERM TO AUGUST 19, 2023 AND INCREASE THE TOTAL NOT TO EXCEED AMOUNT OF $100,000 Recommendation
It is recommended that the City Council authorize the City Manager to execute the second contract amendment with Right of Way, Inc. (ROW) to extend the contract term to August 19, 2023 and increase the maximum amount by $25,000, for a new not to exceed amount of $100,000.

A motion was made to approve recommendation on the Consent Calendar.

15.AWARD OF A CONTRACT FOR PROFESSIONAL SERVICES TO CONDUCT A WATER

AND WASTEWATER SERVICE RATES STUDY
Recommendation
It is recommended that the City Council:

1. Award a professional services agreement to Raftelis Financial Consultants, Inc. (Raftelis) to conduct a comprehensive rate study for water and wastewater services; and

2. Authorize the City Manager to execute an agreement with Raftelis for a not-to-exceed amount of $79,990, including $74,990 for the proposed amount, and a $5,000 contingency.

A motion was made to approve recommendation on the Consent Calendar.

ACTION/DISCUSSION

16.CONSIDERATION OF APPROVAL FOR THE RELOCATION OF PEAFOWL AND THE

CREATION OF A SOUTH PASADENA PEAFOWL MANAGEMENT PLAN
18 - 10
Regular Meeting Minutes August 17, 2022

Page 7 ends

Recommendation
It is recommended that the South Pasadena City Council:

1. Consider the removal of Peafowl; and

2. Creation of a Peafowl Management Plan (PMP).

Lt. Jacobs gave a presentation and responded to City Council questions.

In Person Public Comments:

Bee Simpson spoke regarding the peafowl relocation and policies adopted by local cities.

Edwin Ng spoke regarding the removal of the peafowl population.

Shlomo Nitzani spoke regarding the removal of the peafowl population.

Su Kim spoke regarding the peafowl population and property damage.

Alan Ehrlich spoke regarding the removal of the peafowl population.

Zoom Public Comment:

Oren Biten spoke regarding the removal of the peafowl population.

Jerilyn Schmidt spoke regarding the removal of the peafowl population.

Stephanie Cao spoke regarding the removal of the peafowl population.

Carl spoke regarding the removal of the peafowl population.

Josh Albrektson spoke regarding the removal of the peafowl population.

Muse Mak spoke regarding the removal of the peafowl population.

COUNCIL MOTION AND ACTION:

After extensive discussion, a motion was made by Mayor Pro Tem Primuth and seconded by Councilmember Zneimer to direct staff to declare the peafowl population is a nuisance, to proceed with the full removal of the flock, and the City Manager is directed to investigate with Councilmember Zneimer the suitability of the removal sites for the proposed contractor and report back to City Council by the second meeting of September. The motion carried 5-0, by the following vote:

AYES: Donovan, Mahmud, Primuth, Zneimer, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

17.DISCUSS 2022 FINANCE AD HOC COMMITTEE REPORT
Recommendation
It is recommended that the City Council:
18 - 11
Regular Meeting Minutes August 17, 2022

Page 8 ends

1. Review and discuss the 2022 Finance Ad Hoc Committee (FAHC) Report;

2. Not pursue a forensic audit/internal auditor in light of current and improved fiscal practices; and

3. Receive and file the 2022 Finance Ad Hoc Committee Report Finance Director Ken Louie and City Manager Chaparyan gave a presentation and responded to City Council questions.

Zoom Public Comments:

John spoke regarding the city soliciting a new law firm for City Attorney Services.

Josh Albrektson spoke regarding the City Attorney and the Housing Element.

PUBLIC COMMENT – CONTINUED

18.CONTINUED PUBLIC COMMENT – GENERAL
None.

ADJOURNMENT
There being no further matters, Mayor Cacciotti adjourned the meeting of the City Council at 12:12 A.M., to the next Regular City Council meeting scheduled on Wednesday, September 07, 2022.

Respectfully submitted:
_______________________________
Mark Perez
Deputy City Clerk

APPROVED
_______________________________
Evelyn G. Zneimer
Mayor
18 - 12
Regular Meeting Minutes August 17, 2022

Page 9 ends

Attest:
________________________________
Mark Perez
Deputy City Clerk
Approved at City Council Meeting:
18 - 13

THIS PAGE

INTENTIONALLY

LEFT BLANK
18 - 14
ATTACHMENT 2
December 7, 2022 - Regular City Council Meeting Minutes 18 - 15

THIS PAGE

INTENTIONALLY

LEFT BLANK
18 - 16

CITY OF SOUTH PASADENA

CITY COUNCIL - REGULAR MEETING

M I N U T E S
WEDNESDAY, DECEMBER 7, 2022, AT 7:00 P.M.

CALL TO ORDER:

The Regular Meeting of the South Pasadena City Council was called to order by Mayor Cacciotti on Wednesday, December 7, 2022, at 7:11 P.M. The City Council Chambers are located at 1424 Mission Street, South Pasadena, California.

ROLL CALL:

PRESENT Mayor Michael Cacciotti
Mayor Pro Tem Jon Primuth
Councilmember Jack Donovan
Councilmember Diana Mahmud
Councilmember Evelyn G. Zneimer
ABSENT None.

Yolanda Chavez, Interim Records Specialist, announced a quorum.

CITY STAFF PRESENT:

Arminé Chaparyan, City Manager; Andrew Jared, City Attorney; Yolanda Chavez, Interim Records Specialist and Tiara Solorzano, Administrative Secretary were present at Roll Call. Other staff members presented reports or responded to questions as indicated in the minutes.

PLEDGE OF ALLEGIANCE
The Flag Salute was led by Councilmember Mahmud.
18 - 17
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 2
1A. RECOGNITION OF ASSEMBLYMEMBER CHRIS HOLDEN

Assemblymember Chris Holden gave a speech on his time as assemblymember.

Mayor Cacciotti and City Council presented plaque in recognition of Assemblymember Holden from the City of South Pasadena.

1B. WELCOME AND INTRODUCTION OF ASSEMBLYMEMBER MIKE FONG Mayor Cacciotti introduced and welcomed Assemblymember Mike Fong.

Assemblymember Fong gave a speech on his upcoming role representing the City of South Pasadena.

STATE OF THE CITY / PRESENTATIONS

2. 2022 STATE OF THE CITY PRESENTATION BY MAYOR CACCIOTTI Mayor Cacciotti presented the 2022 State of the City.

CLOSED SESSION ANNOUNCEMENTS

3. CLOSED SESSION ANNOUNCEMENTS
A. CONFERENCE WITH LEGAL COUNSEL: EXISTING LITIGATION
(Government Code Section 54956.9(d)(1))

1. Shahid Abbas v. City of South Pasadena (LASC Case No. 22STCV19084)

2. James v. City of South Pasadena (CDCA, Case No. 2:21-cv-08256-

DSF-KK)

3. Lucina Demirjian v. City of South Pasadena (WCAB Case No.

ADJ16479017)

4. City of South Pasadena v. California Department of Transportation (LASC Case
No. 21STCP01779)

5. Justin Miller v. City of South Pasadena (WCAB Case No. ADJ 16011558)
City Attorney Andrew Jared stated the City Council recessed into closed session at 6:10 P.M. and recessed from closed session at 7:00 P.M. The City Council discussed all items, direction was given to

PRESENTATIONS
18 - 18
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 3
staff, and no reportable action taken for items. Item No. 4 of closed session will be discussed further following open session.

City Attorney Jared also reported that at the conclusion of the November 16, 2022, City Council meeting, Council reconvened into closed session, with all members present, to discuss one item regarding property negotiations - 920 Lohman Lane. Item was discussed, direction was provided to staff, and no reportable action was taken.

PUBLIC COMMENT

4. PUBLIC COMMENT – GENERAL (NON-AGENDA ITEMS)
In-Person Public Comments:

Kay Mouradian commented on traffic conditions on Marengo Avenue.

Yvonne La Rose spoke on Diversity, Equity, Inclusion, and Belonging.

Linda Crowson spoke on Peafowl.

Zoom Public Comments:

Mark Gallatin spoke on Cal Trans properties.

Clarence Au Young spoke on noise complaint.

5. SOUTH PASADENA TOURNAMENT OF ROSES COMMITTEE RAFFLE
South Pasadena Tournament of Roses Committee Chair Brant Dunlap and Committee Member Alan Vlacich conducted raffle and announced the upcoming Crunch Time Party.

6. PRESENTATION OF A CERTIFICATE OF APPRECIATION TO CALIFORNIA

PROTECTIVE PARENTS ASSOCIATION AND ANA ESTEVEZ IN HONOR OF “PIQUI’S LAW,” KEEPING CHILDREN SAFE FROM FAMILY VIOLENCE Sandra Ross from the California Protective Parents Association was presented with a certificate of appreciation on behalf of the City Council.

PRESENTATIONS CONTINUED
18 - 19
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 4

7. PRESENTATION OF A CERTIFICATE OF APPRECIATION TO THE

MEASURE LL COMMITTEE FOR EFFORTS TO PLACE AN ITEM ON THE NOVEMBER 8, 2022 GENERAL MUNICIPAL ELECTION BALLOT TO

EXTEND THE SOUTH PASADENA LIBRARY SPECIAL TAX TO REMAIN IN

EFFECT UNTIL OTHERWISE TERMINATED BY A MAJORITY VOTE OF THE

SOUTH PASADENA ELECTORATE
Mayor Cacciotti presented the members of the Measure LL Committee with a certificate of appreciation for their efforts to place an item on the November 8, 2022, General Municipal Election Ballot for the Library Special Tax extension.

8. DEPARTMENT HIGHLIGHT VIDEO: MANAGEMENT SERVICES

DEPARTMENT
Video highlighting the Management Services Department was played.

9. STAFF INTRODUCTIONS/RECOGNITION
Finance Department:

Kenneth L. Louie, Deputy City Manager/Interim
Hsiulee Tran, Deputy Finance Director/Controller
City Manager Chaparyan highlighted and recognized Deputy City Manager/Interim Finance Director Kenneth L. Louie for his service with the City.

Deputy City Manager/Interim Finance Director Kenneth L. Louie introduced the new Deputy Finance Director/Controller, Hsiulee Tran.

Public Works Department:

Maizon Van Zandt, Maintenance Worker I
Staff requested to introduce Maizon Van Zandt at the next meeting.

10. COUNCILMEMBER COMMUNICATIONS
Councilmember Mahmud spoke on meetings attended on behalf of the City.

Councilmember Donovan spoke on meetings attended on behalf of the City.

Mayor Cacciotti spoke on attending food giveaways, City events, local organizations, and regional meetings.

COMMUNICATIONS
18 - 20
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 5
Councilmember Zneimer – no comments.

Mayor Pro Tem Primuth – no comments.

11. CITY MANAGER COMMUNICATIONS
None.

12. REORDERING OF, ADDITIONS, OR DELETIONS TO THE AGENDA None.

CONSENT CALENDAR
City Manager Chaparyan requested to continue Item No. 22. Councilmember Zneimer requested to pull Item Nos. 13, 15, and 16, for separate discussion.

Councilmember Mahmud requested to pull Item No. 20, for separate discussion.

A motion was made by Councilmember Mahmud and seconded by Councilmember Donovan to approve Item Nos. 14, 17, 18, 19, and 21, of the consent calendar as presented. The motion carried 5-0, by the following vote:

AYES: Mahmud, Donovan, Zneimer, Primuth, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

13. APPROVAL OF PREPAID WARRANTS IN THE AMOUNT OF $80,967.15; GENERAL CITY WARRANTS IN THE AMOUNT OF $728,953.77; VOIDS IN THE AMOUNT OF ($374.04); ONLINE PAYMENTS IN THE AMOUNT OF $11,669.35; TRANSFERS IN THE AMOUNT OF $47,313.19; PAYROLL IN THE AMOUNT OF $793,400.62
Recommendation
It is recommended that the City Council approve the Warrants as presented.

Staff responded to questions from the City Council.

Zoom Public Comment:

Alan Ehrlich spoke on the warrants and legal expenses.

Josh Albretkson spoke on public records requests submitted and warrants. 18 - 21
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 6

COUNCIL MOTION AND ACTION
Councilmember Zneimer requested to pull item for separate discussion.

A motion was made by Councilmember Zneimer and seconded by Councilmember Mahmud to approve Item No. 13, as presented. The motion carried 5-0, by the following vote:

AYES: Mahmud, Donovan, Zneimer, Primuth, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

14. SECOND READING AND ADOPTION OF AN ORDINANCE AMENDING ARTICLES XI (“PURCHASING”) AND XIII (“AWARDING PUBLIC WORKS CONTRACTS”) OF THE SOUTH PASADENA MUNICIPAL CODE

PERTAINING TO PURCHASING POLICIES

ORDINANCE

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY

OF SOUTH PASADENA, CALIFORNIA, AMENDING
SECTION 2.99-29 OF ARTICLE XI RELATING TO
“PURCHASING PROCEDURES”, AND SECTIONS 2.99-
35 AND 2.99-37 OF ARTICLE XIII “AWARDING PUBLIC
WORKS CONTRACTS” OF CHAPTER 2 OF THE SOUTH

PASADENA MUNICIPAL CODE
Recommendation
It is recommended that the City Council conduct a second reading and adopt the ordinance of the City Council of the City of South Pasadena, California, Amending Section 2.99-29 of Article XI Relating to “Purchasing Procedures”, and Sections 2.99-35 and 2.99-37 of Article XIII “Awarding Public Works Contracts” of Chapter 2 of the South Pasadena Municipal Code.

A motion was made to approve recommendation on the Consent Calendar.

Ordinance No. 2369 was adopted.

15. APPROVAL OF A DISCRETIONARY FUNDS REQUEST FROM
COUNCILMEMBER DIANA MAHMUD IN THE AMOUNT OF $250 FOR THE

SOUTH PASADENA TOURNAMENT OF ROSES FLOAT
Recommendation
It is recommended that the City Council:

1. Find that the requested allocation of Discretionary Funds to support the South Pasadena Tournament of Roses (SPTOR) float is consistent with the findings required pursuant to the Guidelines for the Application of City Council Discretionary Budget Accounts adopted by Resolution No. 7174; 18 - 22
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 7
and

2. Approve the requested allocation in the amount of $250 by Councilmember Mahmud to support the SPTOR float.

Staff responded to questions from City Council.

COUNCIL MOTION AND ACTION
Councilmember Zneimer requested to pull item for separate discussion.

A motion was made by Councilmember Zneimer and seconded by Mayor Pro Tem Primuth to approve Item No. 15, as presented. The motion carried 5-0, by the following vote:

AYES: Mahmud, Donovan, Zneimer, Primuth, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

16. APPROVAL OF A PROFESSIONAL SERVICES AGREEMENT WITH

TRUEPOINT SOLUTIONS, AN ACCELA LICENSING/SUBSCRIPTION

AGREEMENT, AND AN ASSOCIATED LASERFICHE AGREEMENT TO

IMPLEMENT AN ACCELA-BASED PROJECT MANAGEMENT AND CASE

MANAGEMENT ON-LINE PERMITTING SYSTEM
Recommendation
It is recommended that the City Council:

1. Review and approve the Professional Services Agreement with TruePoint Solutions for the purchase and implementation of an Accela-based case management and on-line permitting system for a total not-to-exceed amount of $252,567;

2. Review and approve a three-year Accela licensing/subscription agreement for a first year not- to-exceed amount of $28,800 and a three-year not-to exceed amount of $90,792;

3. Authorize the City Manager to execute the necessary subscription agreement with Laserfiche in support of the on-line permitting system in an amount not to exceed $11,388 for the first year; and

4. Authorize the City Manager to execute any other documents related to this Agreement and enter into a Professional Services Agreement with TruePoint Solutions, sign the Accela licensing agreement, and execute a Laserfiche subscription agreement for the implementation of an Accela-based case management and on-line permitting system for the Community Development Department.

Community Development Director Angelica Frausto-Lupo presented the item to the City Council.
18 - 23
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 8
Staff responded to questions from City Council.

COUNCIL MOTION AND ACTION
Councilmember Zneimer requested to pull item for separate discussion.

A motion was made by Councilmember Mahmud and seconded by Councilmember Zneimer to approve Item No. 16, as presented. The motion carried 5-0, by the following vote:

AYES: Mahmud, Donovan, Zneimer, Primuth, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

17. APPROVAL OF RENEWAL OF ANNUAL AGREEMENT WITH DIGITAL MAP PRODUCTS, L.P. FOR GOVCLARITY
Recommendation
It is recommended that the City Council approve the renewal agreement with Digital Map Products, L.P. in an amount not-to-exceed $26,114 for GovClarity, a map-based location information license and application, for the term of October 1, 2022 through September 30, 2023.

A motion was made to approve recommendation on the Consent Calendar.

18. AUTHORIZE THE CITY MANAGER TO EXECUTE A CONTRACT

AMENDMENT FOR THE PROFESSIONAL SERVICES AGREEMENT WITH

CATALYST CONSULTING FOR A COMMUNITY SERVICES DEPARTMENT

ASSESSMENT
Recommendation
It is recommended that the City Council authorize the City Manager to execute the first amendment for the professional services agreement with Catalyst Consulting - Recreation Services for the Community Services Department Assessment for additional analysis in the amount of $5,850 for a total not-toexceed amount of $30,150 and extend the contract until March 31, 2023.

A motion was made to approve recommendation on the Consent Calendar.

19. RECEIVE AND FILE AN ANNUAL REPORT FOR THE FISCAL YEAR 2021- 2022 LIBRARY SPECIAL TAX
Recommendation
It is recommended that the City Council receive and file a report on the Fiscal Year 2021-2022 Library Special Tax, per the requirements of the State of 18 - 24
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 9
California Local Agency Special Tax and Bond Accountability Act.

A motion was made to approve recommendation on the Consent Calendar.

20. REINSTATEMENT OF CONCEAL CARRY WEAPON PERMIT FEES AND

ESTABLISHMENT OF RECURRING APPROPRIATION OF GENERAL FUND

RESERVES FOR DIFFERENCE IN COST FOR APPLICANT

PSYCHOLOGICAL EXAM
Recommendation
It is recommended that the City Council:

1. Approve the recommended edits to the City’s Fee schedule and establishment of the following fees: $317.16 Conceal Carry Weapon (CCW) application fee, $35.00 CCW permit clerical fee, $150.00 CCW psychological evaluation fee, $20.00 CCW amendment fee.

2. Approve an appropriation of $4,500 from General Fund Reserves to Special Department Expense Account 101-4010-4011-8020 for an estimated annual processing of 15 CCW permits within the City, in order to address the difference between cost and reimbursement of applicant psychological exams.

Staff responded to questions from City Council.

COUNCIL MOTION AND ACTION
Councilmember Mahmud requested to pull item for separate discussion.

A motion was made by Councilmember Mahmud and seconded by Councilmember Zneimer to approve Item No. 20, as presented with amendments made via additional document. In addition, staff is directed to work with Senator’s Office to advise the legislation to give South Pasadena the ability to recoup the out-of-pocket costs in its entirety and also to clarify the city can seek a second psychological evaluation, if believed it is warranted. The motion carried 5-0, by the following vote:

AYES: Mahmud, Donovan, Zneimer, Primuth, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

21. APPROVAL OF TRANSPORTATION PROGRAM MANAGER JOB

DESCRIPTION
Recommendation
It is recommended that the City Council approve the revised job classification for the Transportation Program Manager position.

A motion was made to approve recommendation on the Consent Calendar. 18 - 25
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 10

22. APPROVAL OF A PROFESSIONAL SERVICES AGREEMENT WITH
CAROLLO ENGINEERS, INC. TO PROVIDE SEWER CONSENT JUDGMENT

RELATED REPORTS
Recommendation
It is recommended that the City Council:

1. Authorize the City Manager to enter into a Professional Services Agreement with Carollo Engineers, Inc. (Consultant) to assist the City in submitting required reports to the Los Angeles Regional Water Quality Control Board (RWQCB) Enforcement Unit to comply with an existing Consent Judgment. The Professional Services Agreement is in the amount of Sixty-Six Thousand Dollars ($66,000), including $59,968 for the proposed work, and $6,032 (approximately 10%) as a contingency;

2. Authorize an appropriation of $66,000 from the Sewer Reserves Fund 210 to Public Works Sewer Maintenance Professional Services Expenditure Account No. 210-6010-6501-8170- 000 for this work; and

3. Authorize the City Manager to execute all related documents on behalf of the City.

City Manager requested and it was approved by City Council to continue Item No. 22.

23. ADOPTION OF URGENCY AND SECOND READING AND ADOPTION OF REGULAR ORDINANCES BY REFERENCE OF THE 2023 LOS ANGELES

COUNTY BUILDING, RESIDENTIAL, ELECTRICAL, MECHANICAL,

PLUMBING AND EXISTING BUILDING CODES WITH CERTAIN

AMENDMENTS, ADDITIONS AND DELETIONS THERETO BY AMENDING CHAPTER 9 ARTICLE 1 OF THE SOUTH PASADENA MUNICIPAL CODE AND ADD NEW SECTION TO ARTICLE 2 OF CHAPTER 9 TO COMPLY WITH AB 1236 AND AB 970 TO EXPEDITE PERMITTING FOR ELECTRICAL

VEHICLE CHARGING STATIONS

ORDINANCE

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY

OF SOUTH PASADENA, CALIFORNIA, AMENDING THE

CITY OF SOUTH PASADENA MUNICIPAL CODE BY
MODIFYING CHAPTER 9 ARTICLE I THEREOF
ADOPTING BY REFERENCE THE 2023 LOS ANGELES
COUNTY BUILDING CODE (TITLE 26), ELECTRICAL
CODE (TITLE 27), PLUMBING CODE (TITLE 28),
MECHANICAL CODE (TITLE 29), RESIDENTIAL CODE
(TITLE 30), AND EXISTING BUILDING CODE (TITLE 33)

PUBLIC HEARING
18 - 26
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 11

AND BY MODIFYING ARTICLE II THEREOF ADDING

EXPEDITED PERMITTING WITH CERTAIN

AMENDMENTS, ADDITIONS AND DELETIONS

THERETO

URGENCY ORDINANCE

AN URGENCY ORDINANCE OF THE CITY COUNCIL OF

THE CITY OF SOUTH PASADENA, CALIFORNIA,

AMENDING THE CITY OF SOUTH PASADENA
MUNICIPAL CODE BY MODIFYING CHAPTER 9

ARTICLEI THEREOF ADOPTING BY REFERENCE THE
2023 LOS ANGELES COUNTY BUILDING CODE (TITLE
26), ELECTRICAL CODE (TITLE 27), PLUMBING CODE
(TITLE 28), MECHANICAL CODE (TITLE 29),
RESIDENTIAL CODE (TITLE 30), AND EXISTING
BUILDING CODE (TITLE 33) AND BY MODIFYING

ARTICLE II THEREOF ADDING EXPEDITED

PERMITTING WITH CERTAIN AMENDMENTS,

ADDITIONS AND DELETIONS THERETO
Recommendation
It is recommended that the City Council:

1. Hold a Public Hearing to hear any objections to an Ordinance and Urgency Ordinance both adopting by reference and amending the 2023 Los Angeles County Building, Residential, Electrical, Mechanical, Plumbing, and Existing Building Codes;

2. Read by title only and waive further reading for the second reading of an Ordinance adopting by reference and amending the 2023 Los Angeles County Building, Electrical, Plumbing, Mechanical, Residential, and Existing Building Codes;

3. Read by title only and waive further reading of an Urgency Ordinance adopting by reference and amending the 2023 Los Angeles County Building, Electrical, Plumbing, Mechanical, Residential, and Existing Building Codes;

4. Find that adoption of the proposed Ordinance and Urgency Ordinance are exempt from the provisions of the California Environmental Quality Act because such actions Section 15061(b)(3) of Title 14 of the California Code of Regulations;

5. Adopt the Ordinance on Second Reading; and

6. Adopt the Urgency Ordinance.

COUNCIL MOTION AND ACTION
Mayor opened the Public Hearing at 9:37 P.M.

With no public comments, Mayor closed the Public Hearing at 9:38 P.M.

A motion was made by Mayor Pro Tem Primuth and seconded by 18 - 27
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 12
Councilmember Zneimer to adopt recommendation no. 4 and the remainder of staff’s recommendations above, that the adoption of the proposed ordinance and urgency ordinance are exempt from the provisions of California Environmental Quality Act (CEQA), as presented by staff. The motion carried 5-0, by the following vote:

AYES: Mahmud, Donovan, Zneimer, Primuth, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

A motion was made by Mayor Pro Tem Primuth and seconded by Councilmember Mahmud to consider and adopt the second reading of the ordinance, as presented by staff. The motion carried 5-0, by the following vote:

AYES: Mahmud, Donovan, Zneimer, Primuth, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

A motion was made by Mayor Pro Tem Primuth and seconded by Councilmember Mahmud to consider and adopt the urgency ordinance, as presented by staff. The motion carried 5-0, by the following vote:

AYES: Mahmud, Donovan, Zneimer, Primuth, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

Ordinance No. 2370 was adopted.

Urgency Ordinance No. 2371 was adopted.
-This section has intentionally been left blank18 - 28 Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 13

ACTION/DISCUSSION

24. ADOPTION OF A RESOLUTION ELECTING AN ALTERNATE

COUNCILMEMBER TO REPRESENT CITIES WITH PRESCRIPTIVE

PUMPING RIGHTS TO THE SAN GABRIEL BASIN WATER QUALITY

AUTHORITY

RESOLUTION

A RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF SOUTH PASADENA, CALIFORNIA, CASTING ITS

VOTES FOR COUNCILMEMBER TO REPRESENT

CITIES WITH PRESCRIPTIVE WATER PUMPING

RIGHTS AS AN ALTERNATE MEMBER ON THE BOARD

OF THE SAN GABRIEL BASIN WATER QUALITY

AUTHORITY
Recommendation

1. It is recommended that the City Council take a vote to determine who they wish to elect to the San Gabriel Basin Water Quality Authority; and

2. Waive further reading, read by title only and adopt Resolution entitled, "A

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOUTH

PASADENA, CALIFORNIA, CASTING ITS VOTES FOR

COUNCILMEMBER TO REPRESENT CITIES WITH PRESCRIPTIVE

WATER PUMPING RIGHTS AS AN ALTERNATE MEMBER ON THE
BOARD OF THE SAN GABRIEL BASIN WATER QUALITY AUTHORITY".

Assistant to the City Manager Tamara Binns presented on item.

In-Person Public Comment:

Jeff Maloney, City of Alhambra Mayor and Special Council to the Santa Monica Mountains Conservancy, spoke about him seeking an alternate position for the board of the San Gabriel Basin Water Quality Authority.

Members of the City Council asked questions to Mr. Maloney.

Zoom Public Comment:

Anthony commented on audio not being available for this item via zoom.

Assistant to the City Manager Tamara Binns presented the item again for Council consideration.
18 - 29
Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 14

COUNCIL MOTION AND ACTION
A motion was made by Councilmember Mahmud and seconded by Councilmember Zneimer to adopt a resolution to appoint Mayor Maloney from the City of Alhambra to represent cities with prescriptive water pumping rights as an alternate member on the board of the San Gabriel Basin Water Quality Authority. The motion carried 5-0, by the following vote:

AYES: Mahmud, Donovan, Zneimer, Primuth, Mayor Cacciotti NOES: None.

ABSENT: None.

ABSTAINED: None.

Resolution No. 7796 was adopted.

25. ADOPTION OF THE CITY OF SOUTH PASADENA UPDATED EMERGENCY

OPERATIONS PLAN ALONG WITH AN EARTHQUAKE ANNEX AND A

HEAT EMERGENCY ANNEX
Recommendation
It is recommended that the City Council adopt the updated Emergency Operations Plan and associated Annexes.

Fire Chief Paul Riddle introduced the item and Division Chief Eric Zanteson.

Chief requested City Council receive the presentation and staff will bring back the item with a resolution for approval in January 2023.

Fire Division Chief Eric Zanteson gave a presentation on the item.

Staff answered questions from City Council.

COUNCIL MOTION AND ACTION
Hearing no opposition, City Council received and filed the presentation.

PUBLIC COMMENT – CONTINUED

26. CONTINUED PUBLIC COMMENT - GENERAL
None.
-This section has intentionally been left blank18 - 30 Regular Meeting Minutes December 7, 2022
City of South Pasadena Page 15

ADJOURNMENT
There being no further matters, Mayor Cacciotti adjourned the meeting of the City Council at 10:39 P.M., to the next Regular City Council meeting scheduled for Wednesday, December 21, 2022. The City Council recessed back into closed session to continue discussion on Cal Trans item.

Respectfully submitted:
_______________________________
Mark Perez
Deputy City Clerk
Approved:
_______________________________
Evelyn G. Zneimer
Mayor
Attest:
________________________________
Mark Perez
Deputy City Clerk
Approved at City Council Meeting:
18 - 31

THIS PAGE

INTENTIONALLY

LEFT BLANK
18 - 32

← All documents from this meeting