From: John Milliken
To: Cindy Tzafopoulos
Cc: Noah Housh; Mark Prestwich
Subject: Hunter EIR Scoping Comments
Date: Thursday, April 12, 2018 11:14:19 AM
Attachments: C001 SENT Hunter Comment Ltr.pdf
NPS_Urban-facts_final.pdf
Response to Response.docx
Hunter EIR Scoping Comments 4/12/18
Please find listed below areas that should be included in the scope of the new EIR. In addition, I have attached comments from a CEQA Attorney and my own comments prepared in response to the original DEIR. Also attached is an informational report prepared by the EPA that reviews how to protect water quality from Urban Runoff. These attachments detail many of the shortcomings of the original DEIR and I would like them included for consideration for the scoping of the new EIR.
Design, Implementation and Administration of the Affordable Units It will be very difficult to conduct a thorough EIR that subscribes to CEQA standards until the design, implementation, and administration of the affordable housing components are fully understood.
How and who is going to build them? Will they have to built before the market rate houses? How large will they be and how many occupants will they have. How many bedrooms, bathrooms, and parking spaces will there be? Are they going to be rentals or owner occupied? Will the multi-family units need zoning variances or conditional permits? Will the 10 lots with Granny units be deed restricted or under the control of the owner? What mechanisms are in place to ensure that the 10 granny units are indeed made available as affordable and when will they be built. If the project qualifies for a density bonus by right, should the EIR anticipate this and factor in the potential impact of additional units? All of this should be explained and understood BEFORE the EIR is started so that there are no surprises that could derail this second attempt at completing an EIR for this project. It is one thing to draw boxes on a sub-division map and designate them as affordable for development concessions. It is quite another to adequately explain how this will all work within the parameters of existing regulations and requirements. And, without this information, preparing an informed EIR will be incredibly difficult.
Design and Implementation of a controlled intersection at the Pope Street Bridge and Silverado Trail
Well after the completion of the last DEIR, the applicant claimed they had new information and that they would submit a design and pay for this intersection (along with approval from the County) to mitigate traffic impacts. Will information on how this will be accomplished (or is even practical) be provided BEFORE the start of the new EIR?
Plans for mitigating loss of State Designated Prime Agricultural Land Well after the completion of the last DEIR, the applicant claimed that they had new information for a plan for offsetting the loss of Prime Agricultural Land. Will this information be provided BEFORE the start of the new EIR?
Impacts of Traffic Through Neighborhoods
Agenda Item #5.5.
Beyond traffic count studies, will the new EIR take into account traffic that will utilize the Adams and Starr extensions to circumvent traffic delays on the Silverado Trail and Highway 29. The advent of apps like Waze and Google Maps will re-direct increasing amounts of traffic through neighborhoods.
Residents of Hunts Grove will now have to cross a busy intersection upon exiting their development.
This is a particular concern for the safety of children and pedestrians who now do not face crossing a street in order to walk to/from school or shopping.
Loss of open space and safe access to the Napa River Walk for pedestrians and dog walkers Once Starr is extended to meet Adams, residents and visitors who currently use the undeveloped city owned lot to access the River walk will be faced with sharing their walk with traffic and parked cars to reach the walk. This will be a significant danger to children and dog walkers.
John Milliken
[email protected]
707-963-8134 (Office) 707-486-4266 (Mobile\Text)
1256 Hudson Ave.
St. Helena, CA 94574
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
and snowmelt remains above the
surface, where it runs off rapidly in
unnaturally large amounts.
Storm sewer systems concentrate
runoff into smooth, straight
conduits. This runoff gathers speed
and erosional power as it travels
underground. When this runoff
leaves the storm drains and empties
into a stream, its excessive volume
and power blast out streambanks,
damaging streamside vegetation and
wiping out aquatic habitat. These
increased storm flows carry sediment
loads from construction sites and
other denuded surfaces and eroded
streambanks. They often carry
higher water temperatures from
streets, roof tops, and parking lots,
which are harmful to the health and
reproduction of aquatic life.
from
Did you know that because of impervious surfaces like pavement and rooftops, a typical city block generates more than 5 times more runoff than a woodland area of the same size? The most recent National Water Quality Inventory reports that runoff from urbanized areas is the leading source of water quality impairments to surveyed estuaries and the third-largest source of impairments to surveyed lakes.
I
n urban and suburban areas, much
of the land surface is covered
by buildings and pavement, which
do not allow rain and snowmelt
to soak into the ground. Instead,
most developed areas rely on storm
drains to carry large amounts of
runoff from roofs and paved areas to
nearby waterways. The stormwater
runoff carries pollutants such as oil,
dirt, chemicals, and lawn fertilizers
directly to streams and rivers, where
they seriously harm water quality.
To protect surface water quality and
groundwater resources, development
should be designed and built to
minimize increases in runoff.
How Urbanized Areas
Affect Water Quality
Increased Runoff
The porous and varied terrain of
natural landscapes like forests,
wetlands, and grasslands traps
rainwater and snowmelt and allows
them to filter slowly into the ground.
In contrast, impervious (nonporous)
surfaces like roads, parking lots, and
rooftops prevent rain and snowmelt
from infiltrating, or soaking, into
the ground. Most of the rainfall
The loss of infiltration from
urbanization may also cause profound
groundwater changes. Although
urbanization leads to great increases
in flooding during and immediately
after wet weather, in many instances
it results in lower stream flows
during dry weather. Many native fish
and other aquatic life cannot survive
when these conditions prevail.
Increased Pollutant Loads
Urbanization increases the variety
and amount of pollutants carried
into streams, rivers, and lakes. The
pollutants include:
• Sediment
• Oil, grease, and toxic chemicals
from motor vehicles
• Pesticides and nutrients from
lawns and gardens
• Viruses, bacteria, and nutrients
from pet waste and failing septic
systems
• Road salts
• Heavy metals from roof shingles,
motor vehicles, and other sources
• Thermal pollution from dark
impervious surfaces such as streets
and rooftops
These pollutants can harm fish and
wildlife populations, kill native
vegetation, foul drinking water
supplies, and make recreational areas
unsafe and unpleasant.
Clean Water Is Everybody’s Business
URBAN RUNOFF EPA 841-F-03-003
Relationship between impervious cover and surface runoff. Impervious cover in a watershed results in increased surface runoff. As little as 10 percent impervious cover in a watershed can result in stream degradation.
Protecting Water Quality Agenda Item #5.5.
Managing Urban Runoff
What Homeowners Can Do
To decrease polluted runoff from
paved surfaces, households can develop
alternatives to areas traditionally covered
by impervious surfaces. Porous pavement
materials are available for driveways and
sidewalks, and native vegetation and mulch
can replace high maintenance grass lawns.
Homeowners can use fertilizers sparingly
and sweep driveways, sidewalks, and roads
instead of using a hose. Instead of disposing
of yard waste, they can use the materials to
start a compost pile. And homeowners can
learn to use Integrated Pest Management
(IPM) to reduce dependence on harmful
pesticides.
In addition, households can prevent
polluted runoff by picking up after pets and
using, storing, and disposing of chemicals
properly. Drivers should check their cars
for leaks and recycle their motor oil and
antifreeze when these fluids are changed.
Drivers can also avoid impacts from car
wash runoff (e.g., detergents, grime, etc.) by
using car wash facilities that do not generate
runoff. Households served by septic systems
should have them professionally inspected
For More Information
U.S. Environmental Protection Agency
Nonpoint Source Control Branch (4503T)
1200 Pennsylvania Avenue, NW
Washington, DC 20460
www.epa.gov/nps
and pumped every 3 to 5 years. They should
also practice water conservation measures to
extend the life of their septic systems.
Controlling Impacts from New
Development
Developers and city planners should
attempt to control the volume of runoff
from new development by using low
impact development, structural controls,
and pollution prevention strategies. Low
impact development includes measures that
conserve natural areas (particularly sensitive
hydrologic areas like riparian buffers and
infiltrable soils); reduce development
impacts; and reduce site runoff rates by
maximizing surface roughness, infiltration
opportunities, and flow paths.
Controlling Impacts from
Existing Development
Controlling runoff from existing urban
areas is often more costly than controlling
runoff from new developments. Economic
efficiencies are often realized through
approaches that target “hot spots” of
runoff pollution or have multiple benefits,
such as high-efficiency street sweeping
(which addresses aesthetics, road safety,
and water quality). Urban planners and
others responsible for managing urban
and suburban areas can first identify and
implement pollution prevention strategies
and examine source control opportunities.
They should seek out priority pollutant
reduction opportunities, then protect
natural areas that help control runoff, and
finally begin ecological restoration and
retrofit activities to clean up degraded water
bodies. Local governments are encouraged
to take lead roles in public education
efforts through public signage, storm drain
marking, pollution prevention outreach
campaigns, and partnerships with citizen
groups and businesses. Citizens can help
prioritize the clean-up strategies, volunteer
to become involved in restoration efforts,
and mark storm drains with approved “don’t
dump” messages.
Turn Your Home into a Stormwater Pollution Solution!
www.epa.gov/nps
This web site links to an EPA homeowner’s guide to healthy habits for clean water that provides tips for better vehicle and garage care, lawn and garden techniques, home improvement, pet care, and more.
National Management Measures to Control Nonpoint Source Pollution from Urban Areas
www.epa.gov/owow/nps/urbanmm
This technical guidance and reference document is useful to local, state, and tribal managers in implementing management programs for polluted runoff. Contains information on the best available, economically achievable means of reducing pollution of surface waters and groundwater from urban areas.
Onsite Wastewater Treatment System Resources
www.epa.gov/owm/onsite
This web site contains the latest brochures and other resources from EPA for managing onsite wastewater treatment systems (OWTS) such as conventional septic systems and alternative decentralized systems. These resources provide basic information to help individual homeowners, as well as detailed, up-to-date technical guidance of interest to local and state health departments.
Low Impact Development Center
www.lowimpactdevelopment.org
This center provides information on protecting the environment and water resources through integrated site design techniques that are intended to replicate preexisting hydrologic site conditions.
Stormwater Manager’s Resource Center (SMRC)
www.stormwatercenter.net
Created and maintained by the Center for Watershed Protection, this resource center is designed specifically for stormwater practitioners, local government officials, and others that need technical assistance on stormwater management issues.
Strategies: Community Responses to Runoff Pollution
www.nrdc.org/water/pollution/storm/stoinx.asp
The Natural Resources Defense Council developed this interactive web document to explore some of the most effective strategies that communities are using around the nation to control urban runoff pollution. The document is also available in print form and as an interactive CD-ROM.
February 2003
Related Publications
Agenda Item #5.5.
Response to Response to Comments: Prepared by John Milliken Inadequate Analysis and Flawed Findings in FEIR Section I: Hydrology and Water Quality The less than significant finding (LTS) in the FEIR concerning water quality and potential harm to the habitat of the endangered species in the adjacent Napa River is completely without merit. The EIR insufficiently identifies and fails to provide a level of analysis of the significant impacts of polluted runoff, increased storm water volumes, and diminished re-charging of the underlying aquifer (affecting summer stream flows) that will be caused by the project. Not only are the significance of these impacts ignored, corresponding mitigations to lessen their effects are not proposed either.
The credibility of the entire EIR process is in question if you agree with the presumption that an 87 unit development, located in a flood plain, with acres and acres of impervious surfaces (roads, driveways, parking lots, walkways, roofs, patios, utility pads, etc.), will not have any significant impact on water quality, groundwater recharging, or the amount of runoff generated by the project. The likelihood of significant impacts to water quality and harm to protected species is even more pronounced if the cumulative effects over many years are considered. Not identifying cumulative impacts to hydrology and water quality is another serious failure in this FEIR.
Instead of identifying significant impacts and proposing mitigations, the FEIR spontaneously claims that, ”it was abundantly clear that potential impacts to aquatic resources that could potentially result from water quality or runoff flow caused by the project would be insignificant and, therefore, not a significant impact to aquatic resources on, adjacent to, or downstream of the project, including to fish, fish habitat, or fish movement.” This claim was made in spite of a 6 page report to the contrary prepared by a fisheries biologist expert, Jeff Hagar, who was commenting on the inadequacies of the DEIR. Instead of heeding Mr. Hagar’s meticulously researched and documented analysis, the FEIR took a pass on his findings and deflected them all away by claiming that the project will have to apply for an EPA NPEDS (National Pollutant Discharge Elimination System) permit and this will mitigate everything. Interestingly, Table III-1, Required Discretionary and Ministerial Permits and Approvals, from the DEIR does not even list a NPEDS permit.
A General NPED Construction Permit’s scope applies only to storm water runoff during a project’s construction phase and is an important protection for water quality. However, there are no impacts identified in the FEIR concerning Hydrology and Water Quality post construction singularly or cumulatively. And if there are no impacts identified, there are certainly no mitigations offered either. As it turns out, this is a common theme of both the DEIR and FEIR. The analysis of the DEIR was preoccupied with the environmental impacts of the construction phase of the project and tended to ignore/neglect the post construction and cumulative impacts of the project, another example of improper CEQA mandated analysis.
So what types of mitigations could have been proposed by a proper analysis? Quite a few, if you had just perused the EPA’s brochure on the impacts of Urban Development Guidelines. Somehow this readily available information was ignored or not even considered in both the DEIR and FEIR. Which leads one to ponder the competence of the firm that was hired to prepare both of these reports.
Nonpoint source (NPS) pollution, unlike pollution from industrial and sewage treatment plants, comes from many diffuse sources. NPS pollution is caused by rainfall or snowmelt moving over and through the Agenda Item #5.5.
ground. As the runoff moves, it picks up and carries away natural and human-made pollutants, finally depositing them into lakes, rivers, wetlands, coastal waters and ground waters.
Urbanization increases the variety and amount of pollutants carried into our nation's waters. In urban and suburban areas, much of the land surface is covered by buildings, pavement and compacted landscapes. These surfaces do not allow rain and snow melt to soak into the ground which greatly increases the volume and velocity of stormwater runoff. In addition to these habitat-destroying impacts, pollutants from urban runoff include:
•Sediment
•Oil, grease and toxic chemicals from motor vehicles
•Pesticides and nutrients from lawns and gardens
•Viruses, bacteria and nutrients from pet waste and failing septic systems •Road salts
•Heavy metals from roof shingles, motor vehicles and other sources •Thermal pollution from impervious surfaces such as streets and rooftops These pollutants can harm fish and wildlife populations, kill native vegetation, foul drinking water, and make recreational areas unsafe and unpleasant
Controlling Impacts from New
Development
Developers and city planners should
attempt to control the volume of runoff
from new development by using low
impact development, structural controls,
and pollution prevention strategies. Low
impact development includes measures that
conserve natural areas (particularly sensitive
hydrologic areas like riparian buffers and
infiltrable soils); reduce development
impacts; and reduce site runoff rates by
maximizing surface roughness, infiltration
opportunities, and flow paths.
As stated in the DEIR, permit approval is not a substitute for thorough and complete environmental review. From the DEIR:
E. DISCRETIONARY ACTIONS
Agenda Item #5.5.
It is anticipated that this EIR will provide environmental review for all discretionary approvals and actions necessary for the proposed project. A number of permits and approvals would be required before the development of the project could proceed. As Lead Agency for the proposed project, the City of St. Helena would be responsible for the majority of approvals required for development. A list of required permits and approvals that may be required by the City and other agencies includes, without limitation, those provided in Table III-1.
The FEIR does NOT provide environmental review for the discretionary approval and actions necessary for a NPEDS permit.
Given that the project site is located on the floodway of a river that has been designated as impaired for endangered fish species, a thorough EIR analysis, that strictly follows CEQA guidelines, is even more of an imperative. It would surely be a mistake to rely on solely NPEDS permitting standards in such an environmentally sensitive area. The project site is so close to the impaired river that options for improving water quality are extremely limited. Quite simply, polluted high sediment runoff from the acres and acres of impervious surfaces will enter the gravity operated storm water basin and then exit directly into the impaired river. Although it is predicted that storm water handling facilities will have the capacity to handle storm water flows from the project, there is no denying that the level of water pollutants and quantity of runoff into the river from the project will be far greater than pre-project levels. The DEIR refers to studies of sediment TMDL being developed with the goal of reducing sediment discharges into sensitive fish spawning areas. However, these studies are ongoing and TMDLs have not yet been established. Until they are, the FEIR should not assume that the issuing of a NPEDS permit will reduce project water quality to less than significant. This is best summed up by the fisheries biologist, Jeff Hagar:
This comment brings up another shortcoming of the FEIR, there are no comments in regard to the DEIR from other government and private stakeholders working to restore endangered fish habitat just south of the project. Should not there have been comments solicited from California Coastal Conservancy, U.S.
Army Corps of Engineers, Napa County Resource Conservation District, California Fish and Game, California Water Quality Control Board, and a group of 23 private property owners with property that borders the Rutherford Reach, the 4.5 mile stretch of the Napa River between St. Helena and Oakville? Were these entities ever contacted and asked to comment on the DEIR and allowed to express concerns about the projects impacts on their environmental restoration efforts just to the south? As the lead agency responsible for producing an EIR that will adequately inform government decision makers as well as the public, the City of St. Helena should instruct the EIR consulting firm to re-evaluate the preparation of the Hunter Development EIR and recirculate a document that meets the standards established by CEQA. The deficiencies of the FEIR concerning Hydrology and Water Quality documented above are just one of the many areas of this FEIR that provide inadequate and incomplete analysis of the project’s impacts on environmental quality.
Agenda Item #5.5.
Agenda Item #5.5.
From: Cindy Tzafopoulos
To: Noah Housh
Subject: FW: Hunter EIR comments
Date: Thursday, April 12, 2018 4:37:06 PM
Thank you,
Cindy Tzafopoulos
City Clerk
City of St. Helena
1480 Main Street
St. Helena, CA 94574
Direct 707-968-2742 | Fax 707-963-7748
[email protected]
www.cityofsthelena.org
From: [email protected] [mailto:[email protected]]
Sent: Thursday, April 12, 2018 4:36 PM
To: Cindy Tzafopoulos <[email protected]>; Cindy Tzafopoulos <[email protected]>
Cc: [email protected]
Subject: Hunter EIR comments
Hi Cindy – please add these questions to the EIR
Hope all is well. Weird weather, right? From 80 degrees to rain storms and 45 degrees. What season is this?
Cheers,
Ann
Question #1
How will this project affect the St Helena city groundwater wells at the Stonebridge locations? The project plan states it will provide all the landscaping water for 87 houses’ lawns, flowers, bushes, gardens, carwashes, and other watering uses. The number could be 20-40 units higher if the project includes regulated affordable housing. Since the well is located next to the Napa River upstream from the City of St Helena wells that supply our community with water, what mapping will be conducted to determine if the aquifers are connected? If they are connected, then drawing large amounts of water from the same groundwater source needs to be assessed so it does not deplete the City wells supply. Who will conduct the mapping? How many groundwater data points will be included in any mapping exercise? Will it be a sufficient number to adequately determine that the Hunter well is on an aquifer that is separated from the city aquifer? This question must be answered accurately, because the city relies on the groundwater Agenda Item #5.5.
from these 2 wells as a critical source of water in times of drought when Bell Canyon is depleted. (Example – the drought resulting in exposure of large portions of the bottom of the Bell Canyon reservoir.
Question #2:
The project area is in a low lying wet area on the historic floodplain for this part of the Napa River. It has flooded numerous times over the last 20-30 years. Even in non-flood years, large portions have remained wet during the summers, to the point that vine growth and production was hampered due to the wet soils. Presently, this area is covered with standing water during and after rains with water depths often 10-12 inches deep. The project will add millions of gallons (25 acre feet) of landscaping water annually to an area that has never been irrigated.
Will the addition of paved surfaces, construction pads, streets and structures cause compaction of the soils/subsoils in the area? Will this cause subsidence or instability of structures in and around the project area over time? Will subsidence cause new unknown flooding issues? Question #3:
There is an existing subsoil study on the project area that shows what is considered to be the profile of a historic pond, which is typical in areas proximal to meandering rivers. Since the area is a known liquefaction zone in an earthquake prone location, and soils of this type can be unstable, how will this affect the safety of the homes and the structural integrity of the levee in an earthquake or major flood?
Agenda Item #5.5.
From: Tim Nieman
To: Cindy Tzafopoulos; Noah Housh; Mark Prestwich
Subject: Scoping comments on Hunter EIR
Date: Thursday, April 12, 2018 1:37:08 PM
I’d like to submit the following comments for the Scoping of the Hunter EIR Groundwater usage on the site
The estimates of historical groundwater usage on the site need to be redone. The previous EIR made some highly questionable assumptions about historical groundwater usage, leading to an estimate of pre-flood-project groundwater demand on the site of 22 AF. There are two errors in the consultant’s methodology rendering this estimate much too high.
1. The consultant assumed that all of the vineyards on the site were historically irrigated. There is little need to irrigate this wet vineyard and there is no evidence that there has ever been an irrigation system on the site, so the assumption that the well was used to irrigate the entire site is unfounded. There are no remnants of piping or any other irrigation components currently. And, vintners adjacent to the site who have lived here for decades do not recall there ever being such a system. The property is adjacent to the river and is one of the wettest vineyard locations in the valley. There is little need to irrigate there. Adjacent vineyards which are updip and drier are all dry farmed. If the assumption is to be made that irrigation once existed for the entire vineyard, it is incumbent upon the consultants to prove that such a system existed.
2. The consultant assumed vineyard irrigation rates from the Oakville area, a much drier area farther from the Napa River. Even if this area was ever irrigated, Oakville irrigation rates are too high. Again, this is a wet vineyard which would need water only rarely in the driest of years, if at all.
Therefore, historical groundwater pumping on the site was likely localized, sporadic and minimal.
The actual usage would be a small fraction of the 22 AF. What are the new estimates of historical production? What data are used to justify those estimates? Impacts on the Napa River, including fish
The existing groundwater well on the site is only hundreds of feet from the Napa River. If the aquifer being accessed is at all connected to the river, then the well is drawing down from the Napa River, impacting river flows and fish habitat. What is the connection to the Napa River? How much is the impact on river flow from pumping on the site at different rates? A groundwater hydrology study should be undertaken to determine the connection to the river.
Impacts on City Groundwater Supply Wells
The existing groundwater well on the site is updip of City water supply wells and the proposed levels of use could impact City wells. Is it the same aquifer? How would pumping on the site affect groundwater levels in the City wells, at different rates? A groundwater hydrology study should be undertaken to determine if there is a connection to the City’s groundwater supply wells and the potential for drawdown of those wells.
Agenda Item #5.5.
From: Vickie Bradshaw
To: Cindy Tzafopoulos
Cc: Noah Housh; Mark Prestwich
Subject: Hunter EIR Scoping Comments
Date: Thursday, April 12, 2018 9:20:20 AM
CindyBelow are my comments regarding the scope of the Hunter EIR.
1. The EIR for the Hunter Project cannot be done until it is conclusively determined whether or not the Hunter Project qualifies for the 40% affordable housing benefits, including priority in water and sewer connections, use of prior year surplus units from the Growth Management System (GMS), etc. The reason for this is that the environmental impact is completely different if the benefits are applied to the project than if they are not applied. An example is that if the project qualifies under the inclusive housing and affordable housing ordinances, then the entire project can be completed in 2 years, according to the developer. If the project does not qualify, then the Hunter Project could take up to 10 years to complete, assuming very few, if any other houses are built in St. Helena during that timeframe because the project would be limited to the annual 9 units allowed under the GMS. It isn’t hard to see that the environmental impacts are quite different under these two scenarios.
Before the EIR begins, it has to be determined if the Project qualifies for such benefits or not.
This decision cannot run on parallel tracks with the EIR and then come together at the end, as Noah Housh suggested at the neighborhood scoping meeting last month. For the EIR to be accurate, the EIR consultants must know what scenario applies before the EIR begins. And, in cases like this, it does matter to CEQA if the housing is market rate or affordable because the priority benefits derived from hitting a 40% affordable housing rate under City ordinances changes that environmental analysis. In this case, it is not the affordability of the housing that affects the CEQA analysis, but the priority benefits given by the City and/or the state that changes the impact on the environment from building this project.
The prior Hunter Project EIR inappropriately assumed (without confirming) that the Hunter Project would qualify for the priority benefits stemming from the project complying with the inclusive housing and affordable housing ordinances at the 40% rate. That assumption cannot be part of the current EIR process because it likely will make the EIR inaccurate.
If the developer does not want to show to the satisfaction of the City Council that their current proposal completely meets all of the City’s inclusive and affordable housing requirements to qualify for the 40% priority benefits, then the EIR should be done without giving any credit for any of those benefits before the EIR is started. At the very least this would change the environmental analysis from a two-year project to a potential ten-year project with ongoing environmental impacts.
If the EIR assumes the project will qualify for the 40% rate and if it is later determined that the current project cannot meet the inclusive housing and affordable housing ordinance requirements without resubmitting a tentative map, then the City would be in the position of looking at yet another Hunter EIR exercise. It would make more sense to make that determination now.
2. The Hunter Project EIR has to take into consideration the cumulative impacts of the 17-acre Agenda Item #5.5.
Hunter Project, along with the 24-acres of Key Opportunity Sites (sites 1, 2, and 6 on page 134 of the Housing Element Needs Assessment), which begins about 3 blocks from the Hunter Project and extends south across Pope Street. These cumulative sites will significantly impact surrounding streets and the Pope Street bridge. Such cumulative effects will undoubtedly impact the environment and have to be taken into consideration in the Hunter Project EIR.
3. The Hunter Project EIR needs to consider the environmental impacts resulting from a potential levee failure. CA Government Code §65302(g)(2)(A)(vii-viii) requires that St.
Helena include a levee failure map in its General Plan Update to show areas that would be inundated in the event of a levee failure. It will be important to have such an inundation map to show the environmental difference between the situations where the land behind the levee is undeveloped, as it is now, and the situation where the land behind the levee is covered over with asphalt and houses, which is a situation where there would be significantly less permeable land for flood waters to be absorbed. The environmental differences between these two situations would likely be significant.
Of additional environmental interest is that fact that the area closest to the Napa River where the levee is located is considered a high liquefaction susceptibility area (Figure 4.K-2 in the General Plan Update) and liquefaction is a well-known and significant cause of levee failure.
4. The EIR for the Hunter Project has to assume the project can be built out to the maximum density allowed resulting from any density bonuses provided under city ordinances and state law, even assuming the current project does not now show such a density bonus in the “deemed complete” tentative map. The current owner and/or developer could decide after an EIR is approved to sell the property and the new owners could apply for the density bonuses prior to seeking building permits. At that point it would be too late for the EIR to take into consideration the increased housing units, population, cars and other environmental impacts because the EIR would already have been completed and approved.
Thank you for your consideration, Vickie Bradshaw
Victoria Bradshaw
California Strategies, LLC
One Embarcadero, Suite 1060
San Francisco, CA 94111
(415) 705-5276
980 9th Street, Suite 2000
Sacramento, CA 95814
(916) 266-4575
Agenda Item #5.5.
From: Noah Housh
To: "Chuck Vondra"
Cc: [email protected]
Subject: RE: Hunter NOP Electronic Notification
Date: Wednesday, March 07, 2018 10:07:00 AM
Attachments: image001.png
Hi Chuck,
Thank you for taking the time to provide your input on the EIR and project.
City staff and project consultants will ensure that the review process fully vets the proposed project and meets all requirements of the law.
Further, I will be sure to keep you informed of all steps in the review process.
Thanks again,
NOAH HOUSH
PLANNING & COMMUNITY IMPROVEMENT DIRECTOR
City of St. Helena | Planning & Community Improvement Department 1480 Main Street | St. Helena, CA 94574
Direct: (707) 968-2659 | [email protected] | http://cityofsthelena.org/planning From: Chuck Vondra [mailto:[email protected]]
Sent: Tuesday, March 06, 2018 5:35 PM
To: Noah Housh
Cc: [email protected]; CityCouncil
Subject: RE: Hunter NOP Electronic Notification
Hello Noah,
Thanks for hosting the meeting last week. As I mentioned at the meeting, kicking off the EIR seems very premature and a waste of time and money.
1. The applicant is still formulating and the City still reviewing the affordable housing component. How can we comment on something that is incomplete, and has not been reviewed by the city?
2. As was brought up by Planning Commissioner Grace Kistner, our municipal code requires that in order to qualify for density bonuses (without which this project will never get built) the project needs 20% AFU for sale. This will almost certainly require a revised subdivision map, and likely a brand new subdivision application. It seemed to me that the developer has not thought this project out very well as is making it up as he goes along. With this understanding Agenda Item #5.5.
an EIR at this juncture makes no sense.
3. This project is extremely unpopular by a majority of residents and a hasty ill-planned EIR process will most certainly be vigorously challenged. Why not pause and let the developer get his plans together first, it is not fair to ask the community to weigh on a moving target.
Sincerely,
Chuck Vondra – Principal, Sr. Consultant
Bus: 707-963-5418 E-Mail [email protected] Cell: 707-815-6355 1176 Starr Avenue, St. Helena, CA 94574
www.Com-Strat.com
Your independent expert for technology consulting and project management.
The information contained in this email is proprietary and confidential, and may be used only by its intended recipient. If you receive this email in error, you should contact the sender and then delete permanently by pressing <shift><delete>. Thank you for your consideration.
From: Noah Housh [mailto:[email protected]]
Sent: Tuesday, March 6, 2018 5:18 PM
To: Noah Housh <[email protected]>
Subject: Hunter NOP Electronic Notification
***Information Only; Please Do Not Reply All***
Greetings,
At the recently held neighborhood meeting for the Hunter Residential Subdivision, you provided your email contact information indicating you would like to be notified of future project activities.
Attached please find the formal Notice of Preparation initiating the Environmental Impact Review (EIR) process for this project.
As was identified at the neighborhood meeting, a scoping meeting for the EIR is scheduled for Monday, March 12, 2018, from 6:00 – 7:30 pm at the St Helena Fire Department (1480 Main Street).
This meeting will provide an opportunity for individuals to speak directly to the California Environmental Quality Act (CEQA) consultants regarding the scope of the EIR analysis.
Alternatively, if you are unable to attend this meeting, please feel free to provide your written comments to me (electronically or hard copy) any time before April 9, 2018, to ensure they are considered in the EIR analysis. My contact information is provided in the notice, and in the signature below
After the initial analysis is completed, a draft EIR will be published for a 45-day public review and Agenda Item #5.5.
comment period, during which the public will have an additional opportunity to comment on the environmental analysis and resulting document. This is tentatively scheduled to occur in late spring or early summer, 2018.
These comments will then be used to finalize the document making modifications or expanding the analysis, as appropriate. Further, a response to each comment will be provided in the Final draft EIR for the project, which will then be taken before the Planning Commission for review and action at a public hearing tentatively proposed to be held in late summer or early fall of 2018.
Please forward this message to anyone you feel may be interested in the Hunter Residential Subdivision EIR process. Thank you for your attention to this matter.
NOAH HOUSH
PLANNING & COMMUNITY IMPROVEMENT DIRECTOR
City of St. Helena | Planning & Community Improvement Department 1480 Main Street | St. Helena, CA 94574
Direct: (707) 968-2659 | [email protected] | http://cityofsthelena.org/planning Agenda Item #5.5.
From: Cindy Tzafopoulos
To: Noah Housh
Subject: FW:
Date: Thursday, April 12, 2018 4:20:13 PM
Attachments: 541c_93_GP_Policies_9.4.4._&_9.4.5.png
image001.png
image002.png
image004.png
image005.png
image006.png
Thank you,
Cindy Tzafopoulos
City Clerk
City of St. Helena
1480 Main Street
St. Helena, CA 94574
Direct 707-968-2742 | Fax 707-963-7748
[email protected]
www.cityofsthelena.org
From: Wendell Laidley [mailto:[email protected]]
Sent: Thursday, April 12, 2018 4:17 PM
To: Cindy Tzafopoulos <[email protected]> Subject:
Cindy,
The first photos are showing up now. Can you tell me if you receive this with the first 7 photos in it? Just hit reply if you would. Thanks.
Wendell
Dear Cindy,
Please consider these comments regarding the scope of the Hunter EIR.
An earlier EIR dismissed flood risk for the Hunter Property behind the levee as "less than significant" as shown below ...
Agenda Item #5.5.
That citation reports the "potential flooding impact, under CEQA, is less than significant." With due respect to all, I consider the flood risk behind the levee and its potential consequences to be substantial, and ask that the flood risk be thoroughly studied so St. Helena residents and taxpayers do not become liable for damages occurred on that property when the levee alignment violated St.
Helena's own 1993 General Plan, which contained this provision ...
Agenda Item #5.5.
... that "grading and earth filling within the designated 100-year floodway should not be permitted." Unfortunately the Vineyard Valley development was developed directly atop the floodway to the Napa River, as shown on these photographs ...
and from the east side of the River ...
Agenda Item #5.5.
These photos show that the floodwater trapped behind the Vineyard Valley cinder block wall did not overtop the riverbank, but instead drained naturally from the watershed northwest of Vineyard Valley, toward the historic floodway now blocked by Vineyard Valley.
Disruption of that historic natural floodway caused both floods in 1986 and 1995 that caused over $100 Million as documented by City Manager Johansson in his Project Summary report to Assemblywoman Noreen Evans and Senator Pat Wiggins ...
Agenda Item #5.5.
Engineers know as basic safety practice not to obstruct floodplains, as confirmed below in St.
Helena's 1993 General Plan ...
Agenda Item #5.5.
Unfortunately that basic practice was ignored in the levee alignment, which bisects the very floodplain that caused the 1986 and 1995 floods that caused over $100 Million as reported above by former City Manager Bert Johansson.
After the 1986 flood, in his letter of August 14, 1986, to developer McDonnell, then City Engineer Jack Meade warned Mr. McDonnell against reconstructing Vineyard Valley on its floodway blocking site ...
Agenda Item #5.5.
... and in his response to that letter, Professional Engineer Gerald R. Giorgi expressly alerted the landowner that he should "count on being sued" should another flood occur and neighbors be damaged, for "whatever reason" ...
Agenda Item #5.5.
It is unfortunate the General Plan guidelines the professional engineers recommendations were ignored, but when Measure A was passed in 1998, residents of Vineyard Valley, fearing the future flood warned by engineer Giorgi, fought assertively to have their flood protection upgraded to avoid the next damaging flood. Vineyard Valley residents were comforted by the inclusion of this Measure A set-aside to fund flood protection for St. Helena ...
In December 2008, residents sought to preserve the floodplain by suggesting this upgrade to Agenda Item #5.5.
the extant cinder block wall erected after Vineyard Valley's flood in 1986 to flood standard, along Vineyard Valley's north property line ...
Unfortunately the residents were ignored and the levee alignment now cordons off a major component of the natural floodplain, with obvious flood risk increases by obstructing the floodplain.
The residents proposed the remaining floodplain be preserved as a public riverbank park, but advocates of the ill-designed levee across the floodplain won the argument and Vineyard Valley flood protection was approved across the very floodplain that had flooded Vineyard Valley so badly in 1986 and 1995.
When Vineyard Valley residents asked why the levee had to obstruct the floodplain instead of upgrading the cinder block wall along their north property line, and they were told upgraded floodwall around Vineyard Valley and Hunter's Grove "would not work." As an engineer myself, I can only conclude the levee alignment was built across the floodplain to protect developer Hunter's property at public expense, and the sacrifice of a large portion of the historic floodplain.
UC Davis Engineering Professor Nicholas Pinter wrote after completing a site inspection that he found our levee a "field of dreams levee" as he wrote in this report. City management may want to inquire of Professor Pinter as to his opinion of the wisdom of permitting housing development behind the levee.
I personally trust Professor Pinter significantly than I trust the engineers who dangerously aligned our levee right through the middle of our floodplain.
Thank you for your consideration.
Wendell Laidley
Agenda Item #5.5.
st. Helena
Agenda Item #5.5.
From: David Wilkinson
To: Cindy Tzafopoulos
Cc: Noah Housh; Mark Prestwich
Subject: Hunter Project-ERI Scoping Input
Date: Thursday, April 12, 2018 4:11:07 PM
To the City Clerk, St. Helena, et al,
This note is a submission in response to the request for input on the Hunter Property Development EIR scoping exercise.
As you may be aware my home is located somewhat at ground zero of this proposed development and the results of the EIR impacts me very directly and those of my immediate neighbors and the greater St. Helena community dramatically. The EIR, which seems to be evolving with considerable thought, does seem to be predicated on some larger issues that are being relegated to past decisions that do not appear to be as well thought out and that is concerning to me, substantially.
I am relatively new to the community and while attempting to discover what has been a very long process in developing this property there are more questions raised than answered. I would consider myself pro-development but with the caveat that any development is very well thought out, vetted intensely, and evolved with the best practices for the whole community/City in its considerations and approvals. I am pro-development, and not a developer. But I know instinctively when something is not of the potential standard that the community needs and deserves. The very few illustrations of this development that I have seen are of the poorest creative quality that I could imagine and certainly do not seem to fit any, even minimal, urban plan for our City although I have made some efforts to discover what that may actually entail. As I stated in one of the public meetings I am somewhat baffled by the rush to move a poorly defined project forward without much more discovery.
These comments are somewhat outside the bounds of the Scoping Request but the Discovery process is directly related to that Request. I have heard of my neighbors concerns, and they are ground zero concerns, and whole community concerns of mine as well in relation to traffic, water, resources, noise, costs, liability, and impact on every aspect of the future of this City that I am quickly coming to value and appreciate deeply.
Somewhat disconcerting is the revelation that a previous EIR contained information which is to be transported into the new EIR without review. I am particularly concerned with the whole process of developing the levee and its viability particularly relative to the news of so many levees and similar structures in Houston, New Orleans and elsewhere failing when they were supposed to be certified ‘100 year flood’ capable. If this levee fails who is responsible for the destruction that will devastate so many in this community? Who pays for those types of catastrophes? I would ask that this issue not be swept under the proverbial rug and be added, Agenda Item #5.5.
in-depth, to the scope of the EIR work.
My thanks for your work and the commitment from every one of our councilors, City Staff and Executive and Counsel, the Mayor and all of those tasked with this EIR work and they all contribute to our future which is bright indeed.
David G. Wilkinson
704 Hunt Avenue
St. Helena, CA.
94574
1.415.608.5790
[email protected]
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
Agenda Item #5.5.
1-A
Appendix A. California Agricultural LESA Worksheets
Calculation of the Land Evaluation (LE) Score
NOTES Part 1. Land Capability Classification (LCC) Score:
(1) Determine the total acreage of the project. (2) Determine the soil types within the project area and enter them in Column A of the Land Evaluation Worksheet provided on page 2-A. (3) Calculate the total acres of each soil type and enter the amounts in Column B. (4) Divide the acres of each soil type (Column B) by the total acreage to determine the proportion of each soil type present. Enter the proportion of each soil type in Column C. (5) Determine the LCC for each soil type from the applicable Soil Survey and enter it in Column D. (6) From the LCC Scoring Table below, determine the point rating corresponding to the LCC for each soil type and enter it in Column E.
LCC Scoring Table
LCC Class
I IIe IIs,w IIIe IIIs,w IVe IVs,w V VI VII VIII
Points 100 90 80 70 60 50 40 30 20 10 0
(7) Multiply the proportion of each soil type (Column C) by the point score (Column E) and enter the resulting scores in Column F. (8) Sum the LCC scores in Column F. (9) Enter the LCC score in box <1> of the Final LESA Score Sheet on page 10-A.
Part 2. Storie Index Score:
(1) Determine the Storie Index rating for each soil type and enter it in Column G. (2) Multiply the proportion of each soil type (Column C) by the Storie Index rating (Column G) and enter the scores in Column H. (3) Sum the Storie Index scores in Column H to gain the Storie Index Score. (4) Enter the Storie Index Score in box <2> of the Final LESA Score Sheet on page 10-A.
Agenda Item #5.5.
2-A
Land Evaluation Worksheet Site Assessment Worksheet 1.
Land Capability Classification (LCC)
Project Size Score
and Storie Index Scores
A B C D E F G H I J K
Soil Map Project Proportion
of
LCC LCC LCC Storie Storie
Index
LCC Class LCC
Class
LCC
Class
Unit Acres Project Area Rating Score Index Score I - II III IV - VIII (Must Sum LCC Storie Index
Totals to 1.0) Total
Score
Total Score Total Acres
Project Size
Scores
Highest Project
Size Score
104105
118124
3.596
8.588
3.394
0.56616.14
0.22 0.53
0.210.04
IIw-2
IIw-2
IIw-2IVs-4
808080
40 17.84
42.56 16.8
1.4 78.6 61.14
3.596
8.588
3.394
0.566
10.578
30 0.566
0 30
63 587046
13.86 30.74
14.7 1.84
Agenda Item #5.5.
3-A
LESA Worksheet (cont.) Calculation of the Site Assessment (SA) ScoreNOTES Part 1. Project Size Score:.
(1) Using Site Assessment Worksheet 1 provided on page 2-A, enter the acreage of each soil type from Column B in the Column - I, J or K - that corresponds to the LCC for that soil. (Note: While the Project Size Score is a component of the Site Assessment calculations, the score sheet is an extension of data collected in the Land Evaluation Worksheet, and is therefore displayed beside it).(2) Sum Column I to determine the total amount of class I and II soils on the project site. (3) Sum Column J to determine the total amount of class III soils on the project site. (4) Sum Column K to determine the total amount of class IV and lower soils on the project site.(5) Compare the total score for each LCC group in the Project Size Scoring Table below and determine which group receives the highest score.
Project Size Scoring Table
Class I or II Class III Class IV or Lower
Acreage Points Acreage Points Acreage Points
>80 100 >160 100 >320 100
60-79 90 120-159 90 240-319 8040-59 80 80-119 80 160-239 6020-39 50 60-79 70 100-159 4010-19 30 40-59 60 40-99 20 10<
0 20-39 30 40<
0 10-19 10
10<
0 (6) Enter the Project Size Score (the highest score from the three LCC categories) in box <3> of the Final LESA Score Sheet on page 10-A.
Agenda Item #5.5.
4-A
LESA Worksheet (cont.) Part 2. Water Resource Availability Score:
NOTES
(1) Determine the type(s) of irrigation present on the project site, including a determination of whether there is dryland agricultural activity as well. (2) Divide the site into portions according to the type or types of irrigation or dryland cropping that is available in each portion. Enter this information in Column B of Site Assessment Worksheet 2. - Water Resources Availability. (3) Determine the proportion of the total site represented for each portion identified, and enter this information in Column C. (4) Using the Water Resources Availability Scoring Table, identify the option that is most applicable for each portion, based upon the feasibility of irrigation in drought and non-drought years, and whether physical or economic restrictions are likely to exist. Enter the applicable Water Resource Availability Score into Column D. (5) Multiply the Water Resource Availability Score for each portion by the proportion of the project area it represents to determine the weighted score for each portion in Column E. (6) Sum the scores for all portions to determine the project’s total Water Resources Availability Score (7) Enter the Water Resource Availability Score in box <4> of the Final LESA Score Sheet on page 10-A.
Agenda Item #5.5.
5-A
Site Assessment Worksheet 2. - Water Resources Availability A
B
C
D
E
Water Weighted
Project Water Proportion of Availability Availability
Portion Source Project Area Score Score
(C x D)
123456
(Must Sum Total Water
to 1.0) Resource
Score
On-site well 0.4 100 40
Not irrigated 0.6
2 0 12
52
Agenda Item #5.5.
6-A
Water Resource Availability Scoring Table
Non-Drought Years Drought Years
WATER
RESTRICTIONS RESTRICTIONS
Option RESOURCE
Irrigated Physical Economic Irrigated Physical Economic Production Restrictions Restrictions Production Restrictions Restrictions SCORE Feasible? ? ? Feasible? ? ? 1 YES NO NO YES NO NO 1002 YES NO NO YES NO YES 953 YES NO YES YES NO YES 904 YES NO NO YES YES NO 855 YES NO NO YES YES YES 806 YES YES NO YES YES NO 757 YES YES YES YES YES YES 658 YES NO NO NO -- -- -- -- 50 9 YES NO YES NO -- -- -- -- 45 10 YES YES NO NO -- -- -- -- 35 11 YES YES YES NO -- -- -- -- 30 12 Irrigated production not feasible, but rainfall adequate for dryland 25 production in both drought and non-drought years
13 Irrigated production not feasible, but rainfall adequate for dryland 20 production in non-drought years (but not in drought years) 14 Neither irrigated nor dryland production feasible 0
Agenda Item #5.5.
7-A
LESA Worksheet (cont.) Part 3. Surrounding Agricultural Land Use Score:
NOTES
(1) Calculate the project’s Zone of Influence (ZOI) as follows:
(a) a rectangle is drawn around the project such that the rectangle is the smallest that can completely encompass the project area. (b) a second rectangle is then drawn which extends one quarter mile on all sides beyond the first rectangle.
(c) The ZOI includes all parcels that are contained within or are intersected by the second rectangle, less the area of the project itself.
(2) Sum the area of all parcels to determine the total acreage of the ZOI. (3) Determine which parcels are in agricultural use and sum the areas of these parcels (4) Divide the area in agriculture found in step (3) by the total area of the ZOI found in step (2) to determine the percent of the ZOI that is in agricultural use. (5) Determine the Surrounding Agricultural Land Score utilizing the Surrounding Agricultural Land Scoring Table below.
Surrounding Agricultural Land Scoring Table
Percent of ZOI
in
Surrounding
Agricultural
Agriculture Land Score
90-100 100
80-89 9075-79 8070-74 7065-69 6060-64 5055-59 4050-54 3045-49 2040-44 10 <40
0 (5) Enter the Surrounding Agricultural Land Score in box <5> of the Final LESA Score Sheet on page 10-A.
Agenda Item #5.5.
8-A
Site Assessment Worksheet 3. Surrounding Agricultural Land and Surrounding Protected Resource Land
A B C D
E
F
G
Zone of Influence
Surrounding
Total Acres Acres in Acres of Percent in Percent Surrounding Protected Agriculture Protected Agriculture Protected Agricultural Resource Resource Resource Land Land Score Land Score
Land (A/B) (A/C) (From Table) (From Table)
418.5 178.34 86.96 42.96 20.78 10
0
Agenda Item #5.5.
9-A
LESA Worksheet (cont.) Part 4. Protected Resource Lands Score:
NOTES
The Protected Resource Lands scoring relies upon the same Zone of Influence information gathered in Part 3, and figures are entered in Site Assessment Worksheet 3, which combines the surrounding agricultural and protected lands calculations. (1) Use the total area of the ZOI calculated in Part 3. for the Surrounding Agricultural Land Use score. (2) Sum the area of those parcels within the ZOI that are protected resource lands, as defined in the California Agricultural LESA Guidelines. (3) Divide the area that is determined to be protected in Step (2) by the total acreage of the ZOI to determine the percentage of the surrounding area that is under resource protection. (4) Determine the Surrounding Protected Resource Land Score utilizing the Surrounding Protected Resource Land Scoring Table below.
Surrounding Protected Resource Land Scoring Table
Percent of ZOI Protected Resource
Protected Land Score
90-100 100
80-89 9075-79 8070-74 7065-69 6060-64 5055-59 4050-54 3045-49 2040-44 10 <40
0 (5) Enter the Protected Resource Land score in box <6> of the Final LESA Score Sheet on page 10-A.
Agenda Item #5.5.
10-A
Final LESA Score Sheet
LESA Worksheet (cont.) Calculation of the Final LESA Score:
NOTES
(1) Multiply each factor score by the factor weight to determine the weighted score and enter in Weighted Factor Scores column. (2) Sum the weighted factor scores for the LE factors to determine the total LE score for the project. (3) Sum the weighted factor scores for the SA factors to determine the total SA score for the project. (4) Sum the total LE and SA scores to determine the Final LESA Score for the project.
Factor
Scores
Factor
Weight
Weighted
Factor
Scores
LE Factors
Land Capability
Classification
<1> 0.25
Storie
Index
<2> 0.25
LE
Subtotal
0.50 SA Factors
Project
Size
<3> 0.15
Water Resource
Availability
<4> 0.15
Surrounding
Agricultural Land
<5> 0.15
Protected
Resource Land
<6> 0.05
SA
Subtotal
0.50 Final LESA
Score
For further information on the scoring thresholds under the California Agricultural LESA Model, consult Section 4 of the Instruction Manual.
78.6 61.14
19. 7
15.3 35.0
30 5210
0 4.5
7.8 1.5
0.0 13.84
8.8
Agenda Item #5.5.
Average Annual Daily Criteria Pollutant Emissions Hunter Subdivision Project Unmitigated Construction tons Unmitigated Construction average lbs/day Year ROG Nox PM10 exh PM2.5 exh Year ROG Nox PM10 exh PM2.5 exh 2023 0.2271 1.577 0.0722 0.0675 Total 3.1 12.7 0.5 0.5
2024 0.1352 0.00929 0.00046 0.00046
0.2544 1.0927 0.0469 0.0441
2025 0.1602 1.3947 0.0552 0.052
2026 0.3227 0.1578 0.00631 0.00596
0.2447 1.015 0.0403 0.0379
2027 0.244 1.0137 0.0403 0.0379
2028 0.2074 0.9791 0.036 0.0344
Total 1.7957 7.23929 0.29767 0.28022
Construction Duration: 1142 days Total Duration
Site Preparation 3/20/2023 3/31/2023 10 days
Grading 4/1/2023 4/28/2023 20 days
Paving 4/29/2023 5/26/2023 20 days
Building Construction 5/27/2023 12/22/2023 150 days
Architectural Coating 12/23/2023 1/19/2024 20 days
Building Construction 3/18/2024 10/11/2024 150 days
Architectural Coating 10/12/2024 11/8/2024 20 days
Building Construction 3/17/2025 1/30/2026 230 days
Architectural Coating 1/31/2026 2/25/2026 18 days
Building Construction 3/23/2026 10/16/2026 150 days
Architectural Coating 10/17/2026 11/11/2026 18 days
Phase 1
Phase 2
Phase 3
Phase 4
Agenda Item #5.5.
Building Construction 3/22/2027 10/15/2027 150 days
Architectural Coating 10/16/2027 11/10/2027 18 days
Building Construction 3/20/2028 10/13/2028 150 days
Architectural Coating 10/14/2028 11/8/2028 18 days
1142 days
Phase 5
Phase 6
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:32 AM
Hunter Subdivision Project - First Year
Napa County, Annual
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 5.50 Acre 5.50 239,580.00 0
City Park 0.06 Acre 0.06 2,613.60 0
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 2
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2024
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 4 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2023 (March), with completion in January 2024.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed. Page 1815 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced.
Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 4/12/2024 5/26/2023
tblConstructionPhase PhaseEndDate 3/15/2024 12/22/2023
tblConstructionPhase PhaseEndDate 5/10/2024 1/19/2024
tblConstructionPhase PhaseStartDate 3/16/2024 4/29/2023 tblConstructionPhase PhaseStartDate 4/29/2023 5/27/2023 tblConstructionPhase PhaseStartDate 4/13/2024 12/23/2023 tblLandUse Population 6.00 2.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 0.00 2.00
tblTripsAndVMT VendorTripNumber 41.00 11.00
tblTripsAndVMT WorkerTripNumber 15.00 20.00
tblTripsAndVMT WorkerTripNumber 106.00 55.00
tblTripsAndVMT WorkerTripNumber 21.00 11.00
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual Exhaust
PM10
PM10
Total
2.0 Emissions Summary
2.1 Overall Construction
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
CH4 N2O CO2e
Year tons/yr MT/yr
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2023 0.2271 1.5770 1.7270 3.2700e0030.1977 0.0722 0.2698 0.0946 0.0675 0.1621 0.0000 286.2994 286.2994 0.0633 0.0000 287.8816 2024 0.1352 9.2900e0030.0152 3.0000e0056.5000e0044.6000e0041.1100e0031.7000e0044.6000e0046.3000e0040.0000 2.3984 2.3984 1.2000e0040.0000 2.4014 Maximum 0.2271 1.5770 1.7270 3.2700e0030.1977 0.0722 0.2698 0.0946 0.0675 0.1621 0.0633 0.0000 287.8816 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 286.2994 286.2994
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2023 0.2271 1.5770 1.7270 3.2700e0030.1120 0.0722 0.1841 0.0488 0.0675 0.1162 0.0000 286.2991 286.2991 0.0633 0.0000 287.8814 2024 0.1352 9.2900e0030.0152 3.0000e0056.5000e0044.6000e0041.1100e0031.7000e0044.6000e0046.3000e0040.0000 2.3984 2.3984 1.2000e0040.0000 2.4014 Maximum 0.2271 1.5770 1.7270 3.2700e0030.1120 0.0722 0.1841 0.0488 0.0675 0.1162 0.0000 286.2991 286.2991 0.0633 0.0000 287.8814 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 43.22 0.00 31.64 48.37 0.00 28.17 0.00 0.00 0.00 0.00 0.00 0.00
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 3/20/2023 3/31/2023 5 10 2 Grading Grading 4/1/2023 4/28/2023 5 20
150
3 Paving Paving 4/29/2023 5/26/2023 5
1/19/2024 5
20 4 Building Construction Building Construction 5/27/2023 12/22/2023 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 10
Acres of Paving: 5.5
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking 5 Architectural Coating Architectural Coating 12/23/2023 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 1 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Page 1818 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Grading 6 20.00 2.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 55.00 11.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 11.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Page 1819 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual
3.1 Mitigation Measures Construction
NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
Water Exposed Area
3.2 Site Preparation - 2023
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0133 0.1376 0.0912 1.9000e0046.3300e0036.3300e0035.8200e0035.8200e0030.0000 16.7254 16.7254 5.4100e0030.0000 16.8606 Total 0.0133 0.1376 0.0912 1.9000e0045.4100e0030.0903 6.3300e- 0.0000 16.8606 003
0.0967 0.0497 5.8200e0030.0555
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 16.7254 16.7254
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e0041.8000e0041.9700e0031.0000e0057.1000e0040.0000 7.2000e0041.9000e0040.0000 1.9000e0040.0000 0.5494 0.5494 1.0000e0050.0000 0.5497 Total 2.8000e0041.8000e0041.9700e0031.0000e0051.0000e0057.1000e- 0.0000 0.5497 004
0.0000 7.2000e0041.9000e0040.0000 1.9000e0040.0000 0.5494 0.5494
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 0.0407 0.0000 0.0407 0.0223 0.0000 0.0223 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0133 0.1376 0.0912 1.9000e0046.3300e0036.3300e0035.8200e0035.8200e0030.0000 16.7253 16.7253 5.4100e0030.0000 16.8606 Total 0.0133 0.1376 0.0912 1.9000e0045.4100e0030.0407 6.3300e- 0.0000 16.8606 003
0.0470 0.0223 5.8200e0030.0282
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 16.7253 16.7253
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.8000e0041.8000e0041.9700e0031.0000e0057.1000e0040.0000 7.2000e0041.9000e0040.0000 1.9000e0040.0000 0.5494 0.5494 1.0000e0050.0000 0.5497 Total 2.8000e0041.8000e0041.9700e0031.0000e0051.0000e0057.1000e- 0.0000 0.5497 004
0.0000 7.2000e0041.9000e0040.0000 1.9000e0040.0000 0.5494 0.5494
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Grading - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 0.0655 0.0000 0.0655 0.0337 0.0000 0.0337 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0171 0.1794 0.1475 3.0000e0047.7500e0037.7500e0037.1300e0037.1300e0030.0000 26.0606 26.0606 8.4300e0030.0000 26.2713 Total 0.0171 0.1794 0.1475 3.0000e0048.4300e0030.0655 7.7500e- 0.0000 26.2713 003
0.0733 0.0337 7.1300e0030.0408
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 26.0606 26.0606
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 5.0000e0051.5800e0034.5000e0041.0000e0051.3000e0040.0000 1.3000e0044.0000e0050.0000 4.0000e0050.0000 0.4962 0.4962 2.0000e0050.0000 0.4967 Worker 6.2000e0044.0000e0044.3700e0031.0000e0051.5800e0031.0000e0051.5900e0034.2000e0041.0000e0054.3000e0040.0000 1.2208 1.2208 3.0000e0050.0000 1.2215 Total 6.7000e0041.9800e0034.8200e0032.0000e0055.0000e0051.7100e- 0.0000 1.7182 003
1.0000e0051.7200e0034.6000e0041.0000e0054.7000e0040.0000 1.7169 1.7169
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 0.0295 0.0000 0.0295 0.0152 0.0000 0.0152 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0171 0.1794 0.1475 3.0000e0047.7500e0037.7500e0037.1300e0037.1300e0030.0000 26.0606 26.0606 8.4300e0030.0000 26.2713 Total 0.0171 0.1794 0.1475 3.0000e0048.4300e0030.0295 7.7500e- 0.0000 26.2713 003
0.0372 0.0152 7.1300e0030.0223
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 26.0606 26.0606
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 5.0000e0051.5800e0034.5000e0041.0000e0051.3000e0040.0000 1.3000e0044.0000e0050.0000 4.0000e0050.0000 0.4962 0.4962 2.0000e0050.0000 0.4967 Worker 6.2000e0044.0000e0044.3700e0031.0000e0051.5800e0031.0000e0051.5900e0034.2000e0041.0000e0054.3000e0040.0000 1.2208 1.2208 3.0000e0050.0000 1.2215 Total 6.7000e0041.9800e0034.8200e0032.0000e0055.0000e0051.7100e- 0.0000 1.7182 003
1.0000e0051.7200e0034.6000e0041.0000e0054.7000e0040.0000 1.7169 1.7169
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.4 Paving - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 0.0103 0.1019 0.1458 2.3000e0045.1000e0035.1000e0034.6900e0034.6900e0030.0000 20.0269 20.0269 6.4800e0030.0000 20.1888 Paving 7.2100e0030.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0175 0.1019 0.1458 2.3000e0046.4800e0035.1000e- 0.0000 20.1888 003
5.1000e0034.6900e0034.6900e003
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 20.0269 20.0269
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.6000e0043.0000e0043.2800e0031.0000e0051.1900e0031.0000e0051.1900e0033.2000e0041.0000e0053.2000e0040.0000 0.9156 0.9156 2.0000e0050.0000 0.9161 Total 4.6000e0043.0000e0043.2800e0031.0000e0052.0000e0051.1900e- 0.0000 0.9161 003
1.0000e0051.1900e0033.2000e0041.0000e0053.2000e0040.0000 0.9156 0.9156
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 0.0103 0.1019 0.1458 2.3000e0045.1000e0035.1000e0034.6900e0034.6900e0030.0000 20.0268 20.0268 6.4800e0030.0000 20.1888 Paving 7.2100e0030.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0175 0.1019 0.1458 2.3000e0046.4800e0035.1000e- 0.0000 20.1888 003
5.1000e0034.6900e0034.6900e003
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 20.0268 20.0268
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.6000e0043.0000e0043.2800e0031.0000e0051.1900e0031.0000e0051.1900e0033.2000e0041.0000e0053.2000e0040.0000 0.9156 0.9156 2.0000e0050.0000 0.9161 Total 4.6000e0043.0000e0043.2800e0031.0000e0052.0000e0051.1900e- 0.0000 0.9161 003
1.0000e0051.1900e0033.2000e0041.0000e0053.2000e0040.0000 0.9156 0.9156
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.5 Building Construction - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 0.1180 1.0789 1.2183 2.0200e0030.0525 0.0525 0.0494 0.0494 0.0000 173.8536 173.8536 0.0414 0.0000 174.8875 Total 0.1180 1.0789 1.2183 2.0200e0030.0525 0.0525 0.0494 0.0494 0.0414 0.0000 174.8875 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 173.8536 173.8536
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.9400e0030.0652 0.0187 2.1000e0045.4100e0038.0000e0055.4800e0031.5600e0037.0000e0051.6400e0030.0000 20.4667 20.4667 9.3000e0040.0000 20.4899 Worker 0.0127 8.2500e0030.0902 2.8000e0040.0326 2.1000e0040.0328 8.6700e0031.9000e0048.8600e0030.0000 25.1783 25.1783 5.6000e0040.0000 25.1924 Total 0.0147 0.0735 0.1089 4.9000e0041.4900e0030.0380 2.9000e- 0.0000 45.6823 004
0.0383 0.0102 2.6000e0040.0105 0.0000 45.6450 45.6450
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 0.1180 1.0789 1.2183 2.0200e0030.0525 0.0525 0.0494 0.0494 0.0000 173.8534 173.8534 0.0414 0.0000 174.8873 Total 0.1180 1.0789 1.2183 2.0200e0030.0525 0.0525 0.0494 0.0494 0.0414 0.0000 174.8873 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 173.8534 173.8534
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.9400e0030.0652 0.0187 2.1000e0045.4100e0038.0000e0055.4800e0031.5600e0037.0000e0051.6400e0030.0000 20.4667 20.4667 9.3000e0040.0000 20.4899 Worker 0.0127 8.2500e0030.0902 2.8000e0040.0326 2.1000e0040.0328 8.6700e0031.9000e0048.8600e0030.0000 25.1783 25.1783 5.6000e0040.0000 25.1924 Total 0.0147 0.0735 0.1089 4.9000e0041.4900e0030.0380 2.9000e- 0.0000 45.6823 004
0.0383 0.0102 2.6000e0040.0105 0.0000 45.6450 45.6450
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.6 Architectural Coating - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.0445 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.8000e0043.2600e0034.5300e0031.0000e0051.8000e0041.8000e0041.8000e0041.8000e0040.0000 0.6383 0.6383 4.0000e0050.0000 0.6393 Total 0.0450 3.2600e0034.5300e0031.0000e0054.0000e0051.8000e- 0.0000 0.6393 004
1.8000e0041.8000e0041.8000e004
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 0.6383 0.6383
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.0000e0056.0000e0056.0000e0040.0000 2.2000e0040.0000 2.2000e0046.0000e0050.0000 6.0000e0050.0000 0.1679 0.1679 0.0000 0.0000 0.1680 Total 8.0000e0056.0000e0056.0000e0040.0000 2.2000e- 0.0000 0.0000 0.1680 004
0.0000 2.2000e0046.0000e0050.0000 6.0000e0050.0000 0.1679 0.1679
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.0445 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.8000e0043.2600e0034.5300e0031.0000e0051.8000e0041.8000e0041.8000e0041.8000e0040.0000 0.6383 0.6383 4.0000e0050.0000 0.6393 Total 0.0450 3.2600e0034.5300e0031.0000e0054.0000e0051.8000e- 0.0000 0.6393 004
1.8000e0041.8000e0041.8000e004
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 0.6383 0.6383
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 8.0000e0056.0000e0056.0000e0040.0000 2.2000e0040.0000 2.2000e0046.0000e0050.0000 6.0000e0050.0000 0.1679 0.1679 0.0000 0.0000 0.1680 Total 8.0000e0056.0000e0056.0000e0040.0000 2.2000e- 0.0000 0.0000 0.1680 004
0.0000 2.2000e0046.0000e0050.0000 6.0000e0050.0000 0.1679 0.1679
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.6 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.1336 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.3600e0039.1400e0030.0136 2.0000e0054.6000e0044.6000e0044.6000e0044.6000e0040.0000 1.9149 1.9149 1.1000e0040.0000 1.9176 Total 0.1349 9.1400e0030.0136 2.0000e0051.1000e0044.6000e- 0.0000 1.9176 004
4.6000e0044.6000e0044.6000e004
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 1.9149 1.9149
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e0041.5000e0041.6600e0031.0000e0056.5000e0040.0000 6.6000e0041.7000e0040.0000 1.8000e0040.0000 0.4835 0.4835 1.0000e0050.0000 0.4837 Total 2.4000e0041.5000e0041.6600e0031.0000e0051.0000e0056.5000e- 0.0000 0.4837 004
0.0000 6.6000e0041.7000e0040.0000 1.8000e0040.0000 0.4835 0.4835
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.1336 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.3600e0039.1400e0030.0136 2.0000e0054.6000e0044.6000e0044.6000e0044.6000e0040.0000 1.9149 1.9149 1.1000e0040.0000 1.9176 Total 0.1349 9.1400e0030.0136 2.0000e0051.1000e0044.6000e- 0.0000 1.9176 004
4.6000e0044.6000e0044.6000e004
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 1.9149 1.9149
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.4000e0041.5000e0041.6600e0031.0000e0056.5000e0040.0000 6.6000e0041.7000e0040.0000 1.8000e0040.0000 0.4835 0.4835 1.0000e0050.0000 0.4837 Total 2.4000e0041.5000e0041.6600e0031.0000e0051.0000e0056.5000e- 0.0000 0.4837 004
0.0000 6.6000e0041.7000e0040.0000 1.8000e0040.0000 0.4835 0.4835
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:35 AM
Hunter Subdivision Project - First Year
Napa County, Summer
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 5.50 Acre 5.50 239,580.00 0
City Park 0.06 Acre 0.06 2,613.60 0
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 2
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2024
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 4 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2023 (March), with completion in January 2024.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed. Page 1832 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced.
Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 4/12/2024 5/26/2023
tblConstructionPhase PhaseEndDate 3/15/2024 12/22/2023
tblConstructionPhase PhaseEndDate 5/10/2024 1/19/2024
tblConstructionPhase PhaseStartDate 3/16/2024 4/29/2023 tblConstructionPhase PhaseStartDate 4/29/2023 5/27/2023 tblConstructionPhase PhaseStartDate 4/13/2024 12/23/2023 tblLandUse Population 6.00 2.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 0.00 2.00
tblTripsAndVMT VendorTripNumber 41.00 11.00
tblTripsAndVMT WorkerTripNumber 15.00 20.00
tblTripsAndVMT WorkerTripNumber 106.00 55.00
tblTripsAndVMT WorkerTripNumber 21.00 11.00
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer Exhaust
PM10
PM10
Total
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2023 18.0361 27.5558 18.6698 0.0394 18.2141 1.2669 19.4811 9.9699 1.1656 11.1355 0.0000 3,816.822 9 3,816.822
9 1.1954 0.0000 3,846.708
8 2024 18.0228 1.2362 2.0497 3.7300e0030.0904 0.0615 0.1518 0.0240 0.0614 0.0854 0.0000 357.4378 357.4378 0.0174 0.0000 357.8735 Maximum 18.0361 27.5558 18.6698 0.0394 1.1954 0.0000 3,846.708 8 18.2141 1.2669 19.4811 9.9699 1.1656 11.1355
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,816.822
9 3,816.822
9 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2023 18.0361 27.5558 18.6698 0.0394 8.2777 1.2669 9.5446 4.5080 1.1656 5.6736 0.0000 3,816.822 9 3,816.822
9 1.1954 0.0000 3,846.708
8 2024 18.0228 1.2362 2.0497 3.7300e0030.0904 0.0615 0.1518 0.0240 0.0614 0.0854 0.0000 357.4378 357.4378 0.0174 0.0000 357.8735 Maximum 18.0361 27.5558 18.6698 0.0394 8.2777 1.2669 9.5446 4.5080 1.1656 5.6736 0.0000 3,816.822 9 3,816.822
9 1.1954 0.0000 3,846.708
8 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 54.28 0.00 50.61 54.65 0.00 48.68 0.00 0.00 0.00 0.00 0.00 0.00
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 3/20/2023 3/31/2023 5 10 2 Grading Grading 4/1/2023 4/28/2023 5 20
150
3 Paving Paving 4/29/2023 5/26/2023 5
1/19/2024 5
20 4 Building Construction Building Construction 5/27/2023 12/22/2023 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 10
Acres of Paving: 5.5
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
5 Architectural Coating Architectural Coating 12/23/2023 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 1 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Page 1835 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Grading 6 20.00 2.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 55.00 11.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 11.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Page 1836 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer
3.1 Mitigation Measures Construction
NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
Water Exposed Area
3.2 Site Preparation - 2023
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.6595 27.5242 18.2443 0.0381 1.2660 1.2660 1.1647 1.1647 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 2.6595 27.5242 18.2443 0.0381 1.1926 3,717.121
9 18.0663 1.2660 19.3323 9.9307 1.1647 11.0954
SO2 Fugitive
PM10
Exhaust
PM10
3,687.308
1 3,687.308
1 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0583 0.0317 0.4255 1.3000e0030.1479 9.0000e0040.1488 0.0392 8.3000e0040.0401 129.5148 129.5148 2.8900e003129.5870 Total 0.0583 0.0317 0.4255 1.3000e0032.8900e0030.1479 9.0000e- 129.5870 004
0.1488 0.0392 8.3000e0040.0401 129.5148 129.5148
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 2.6595 27.5242 18.2443 0.0381 1.2660 1.2660 1.1647 1.1647 0.0000 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 2.6595 27.5242 18.2443 0.0381 1.1926 3,717.121
9 8.1298 1.2660 9.3958 4.4688 1.1647 5.6336
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,687.308
1 3,687.308
1 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0583 0.0317 0.4255 1.3000e0030.1479 9.0000e0040.1488 0.0392 8.3000e0040.0401 129.5148 129.5148 2.8900e003129.5870 Total 0.0583 0.0317 0.4255 1.3000e0032.8900e0030.1479 9.0000e- 129.5870 004
0.1488 0.0392 8.3000e0040.0401 129.5148 129.5148
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Grading - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 1.7109 17.9359 14.7507 0.0297 0.7749 0.7749 0.7129 0.7129 2,872.691 0 2,872.691
0 0.9291 2,895.918
2 Total 1.7109 17.9359 14.7507 0.0297 0.9291 2,895.918
2 6.5523 0.7749 7.3273 3.3675 0.7129 4.0804
SO2 Fugitive
PM10
Exhaust
PM10
2,872.691
0 2,872.691
0 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.6000e0030.1568 0.0427 5.2000e0040.0135 1.8000e0040.0137 3.8900e0031.7000e0044.0700e00355.2560 55.2560 2.4000e00355.3159 Worker 0.0648 0.0352 0.4727 1.4400e0030.1643 1.0000e0030.1653 0.0436 9.2000e0040.0445 143.9053 143.9053 3.2100e003143.9855 Total 0.0694 0.1919 0.5154 1.9600e0035.6100e0030.1778 1.1800e- 199.3014 003
0.1790 0.0475 1.0900e0030.0486 199.1613 199.1613
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 2.9486 0.0000 2.9486 1.5154 0.0000 1.5154 0.0000 0.0000 Off-Road 1.7109 17.9359 14.7507 0.0297 0.7749 0.7749 0.7129 0.7129 0.0000 2,872.691 0 2,872.691
0 0.9291 2,895.918
2 Total 1.7109 17.9359 14.7507 0.0297 0.9291 2,895.918
2 2.9486 0.7749 3.7235 1.5154 0.7129 2.2283
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,872.691
0 2,872.691
0 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.6000e0030.1568 0.0427 5.2000e0040.0135 1.8000e0040.0137 3.8900e0031.7000e0044.0700e00355.2560 55.2560 2.4000e00355.3159 Worker 0.0648 0.0352 0.4727 1.4400e0030.1643 1.0000e0030.1653 0.0436 9.2000e0040.0445 143.9053 143.9053 3.2100e003143.9855 Total 0.0694 0.1919 0.5154 1.9600e0035.6100e0030.1778 1.1800e- 199.3014 003
0.1790 0.0475 1.0900e0030.0486 199.1613 199.1613
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.4 Paving - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.0327 10.1917 14.5842 0.0228 0.5102 0.5102 0.4694 0.4694 2,207.584 1 2,207.584
1 0.7140 2,225.433
6 Paving 0.7205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7532 10.1917 14.5842 0.0228 0.7140 2,225.433
6 0.5102 0.5102 0.4694 0.4694
SO2 Fugitive
PM10
Exhaust
PM10
2,207.584
1 2,207.584
1 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0486 0.0264 0.3546 1.0800e0030.1232 7.5000e0040.1240 0.0327 6.9000e0040.0334 107.9290 107.9290 2.4100e003107.9891 Total 0.0486 0.0264 0.3546 1.0800e0032.4100e0030.1232 7.5000e- 107.9891 004
0.1240 0.0327 6.9000e0040.0334 107.9290 107.9290
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.0327 10.1917 14.5842 0.0228 0.5102 0.5102 0.4694 0.4694 0.0000 2,207.584 1 2,207.584
1 0.7140 2,225.433
6 Paving 0.7205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7532 10.1917 14.5842 0.0228 0.7140 2,225.433
6 0.5102 0.5102 0.4694 0.4694
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,207.584
1 2,207.584
1 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0486 0.0264 0.3546 1.0800e0030.1232 7.5000e0040.1240 0.0327 6.9000e0040.0334 107.9290 107.9290 2.4100e003107.9891 Total 0.0486 0.0264 0.3546 1.0800e0032.4100e0030.1232 7.5000e- 107.9891 004
0.1240 0.0327 6.9000e0040.0334 107.9290 107.9290
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.5 Building Construction - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 1.5728 14.3849 16.2440 0.0269 0.6079 2,570.406
1 0.6997 0.6997 0.6584 0.6584
SO2 Fugitive
PM10
Exhaust
PM10
2,555.209
9 2,555.209
9 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0253 0.8621 0.2348 2.8700e0030.0744 9.9000e0040.0754 0.0214 9.5000e0040.0224 303.9081 303.9081 0.0132 304.2374 Worker 0.1782 0.0967 1.3000 3.9700e0030.4518 2.7600e0030.4546 0.1198 2.5400e0030.1224 395.7396 395.7396 8.8200e003395.9602 Total 0.2035 0.9588 1.5348 6.8400e0030.5262 3.7500e- 0.0220 700.1976 003
0.5300 0.1413 3.4900e0030.1447 699.6476 699.6476
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 0.0000 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 1.5728 14.3849 16.2440 0.0269 0.6079 2,570.406
1 0.6997 0.6997 0.6584 0.6584
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,555.209
9 2,555.209
9 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0253 0.8621 0.2348 2.8700e0030.0744 9.9000e0040.0754 0.0214 9.5000e0040.0224 303.9081 303.9081 0.0132 304.2374 Worker 0.1782 0.0967 1.3000 3.9700e0030.4518 2.7600e0030.4546 0.1198 2.5400e0030.1224 395.7396 395.7396 8.8200e003395.9602 Total 0.2035 0.9588 1.5348 6.8400e0030.5262 3.7500e- 0.0220 700.1976 003
0.5300 0.1413 3.4900e0030.1447 699.6476 699.6476
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.6 Architectural Coating - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8690 Total 18.0005 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0168 281.8690 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0357 0.0193 0.2600 7.9000e0040.0904 5.5000e0040.0909 0.0240 5.1000e0040.0245 79.1479 79.1479 1.7600e00379.1920 Total 0.0357 0.0193 0.2600 7.9000e0041.7600e0030.0904 5.5000e- 79.1920 004
0.0909 0.0240 5.1000e0040.0245 79.1479 79.1479
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0000 281.4481 281.4481 0.0168 281.8690 Total 18.0005 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0168 281.8690 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0357 0.0193 0.2600 7.9000e0040.0904 5.5000e0040.0909 0.0240 5.1000e0040.0245 79.1479 79.1479 1.7600e00379.1920 Total 0.0357 0.0193 0.2600 7.9000e0041.7600e0030.0904 5.5000e- 79.1920 004
0.0909 0.0240 5.1000e0040.0245 79.1479 79.1479
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.6 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 17.9896 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0332 0.0174 0.2396 7.6000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 75.9897 75.9897 1.5800e00376.0292 Total 0.0332 0.0174 0.2396 7.6000e0041.5800e0030.0904 5.4000e- 76.0292 004
0.0909 0.0240 4.9000e0040.0245 75.9897 75.9897
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Total 17.9896 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0332 0.0174 0.2396 7.6000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 75.9897 75.9897 1.5800e00376.0292 Total 0.0332 0.0174 0.2396 7.6000e0041.5800e0030.0904 5.4000e- 76.0292 004
0.0909 0.0240 4.9000e0040.0245 75.9897 75.9897
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:36 AM
Hunter Subdivision Project - First Year
Napa County, Winter
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Other Asphalt Surfaces 5.50 Acre 5.50 239,580.00 0
City Park 0.06 Acre 0.06 2,613.60 0
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 2
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2024
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 4 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2023 (March), with completion in January 2024.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed. Page 1849 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced.
Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 4/12/2024 5/26/2023
tblConstructionPhase PhaseEndDate 3/15/2024 12/22/2023
tblConstructionPhase PhaseEndDate 5/10/2024 1/19/2024
tblConstructionPhase PhaseStartDate 3/16/2024 4/29/2023 tblConstructionPhase PhaseStartDate 4/29/2023 5/27/2023 tblConstructionPhase PhaseStartDate 4/13/2024 12/23/2023 tblLandUse Population 6.00 2.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 0.00 2.00
tblTripsAndVMT VendorTripNumber 41.00 11.00
tblTripsAndVMT WorkerTripNumber 15.00 20.00
tblTripsAndVMT WorkerTripNumber 106.00 55.00
tblTripsAndVMT WorkerTripNumber 21.00 11.00
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter Exhaust
PM10
PM10
Total
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2023 18.0380 27.5643 18.6514 0.0393 18.2141 1.2669 19.4811 9.9699 1.1656 11.1355 0.0000 3,807.105 6 3,807.105
6 1.1953 0.0000 3,836.987
4 2024 18.0246 1.2408 2.0386 3.6800e0030.0904 0.0615 0.1518 0.0240 0.0614 0.0854 0.0000 351.7373 351.7373 0.0173 0.0000 352.1706 Maximum 18.0380 27.5643 18.6514 0.0393 1.1953 0.0000 3,836.987 4 18.2141 1.2669 19.4811 9.9699 1.1656 11.1355
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,807.105
6 3,807.105
6 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2023 18.0380 27.5643 18.6514 0.0393 8.2777 1.2669 9.5446 4.5080 1.1656 5.6736 0.0000 3,807.105 6 3,807.105
6 1.1953 0.0000 3,836.987
4 2024 18.0246 1.2408 2.0386 3.6800e0030.0904 0.0615 0.1518 0.0240 0.0614 0.0854 0.0000 351.7373 351.7373 0.0173 0.0000 352.1706 Maximum 18.0380 27.5643 18.6514 0.0393 8.2777 1.2669 9.5446 4.5080 1.1656 5.6736 0.0000 3,807.105 6 3,807.105
6 1.1953 0.0000 3,836.987
4 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 54.28 0.00 50.61 54.65 0.00 48.68 0.00 0.00 0.00 0.00 0.00 0.00
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 3/20/2023 3/31/2023 5 10 2 Grading Grading 4/1/2023 4/28/2023 5 20
150
3 Paving Paving 4/29/2023 5/26/2023 5
1/19/2024 5
20 4 Building Construction Building Construction 5/27/2023 12/22/2023 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 10
Acres of Paving: 5.5
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
5 Architectural Coating Architectural Coating 12/23/2023 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 1 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Page 1852 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Grading 6 20.00 2.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 55.00 11.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 11.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Page 1853 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter
3.1 Mitigation Measures Construction
NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
Water Exposed Area
3.2 Site Preparation - 2023
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 2.6595 27.5242 18.2443 0.0381 1.2660 1.2660 1.1647 1.1647 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 2.6595 27.5242 18.2443 0.0381 1.1926 3,717.121
9 18.0663 1.2660 19.3323 9.9307 1.1647 11.0954
SO2 Fugitive
PM10
Exhaust
PM10
3,687.308
1 3,687.308
1 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0402 0.4071 1.2000e0030.1479 9.0000e0040.1488 0.0392 8.3000e0040.0401 119.7975 119.7975 2.7200e003119.8655 Total 0.0614 0.0402 0.4071 1.2000e0032.7200e0030.1479 9.0000e- 119.8655 004
0.1488 0.0392 8.3000e0040.0401 119.7975 119.7975
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 8.1298 0.0000 8.1298 4.4688 0.0000 4.4688 0.0000 0.0000 Off-Road 2.6595 27.5242 18.2443 0.0381 1.2660 1.2660 1.1647 1.1647 0.0000 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 2.6595 27.5242 18.2443 0.0381 1.1926 3,717.121
9 8.1298 1.2660 9.3958 4.4688 1.1647 5.6336
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,687.308
1 3,687.308
1 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0614 0.0402 0.4071 1.2000e0030.1479 9.0000e0040.1488 0.0392 8.3000e0040.0401 119.7975 119.7975 2.7200e003119.8655 Total 0.0614 0.0402 0.4071 1.2000e0032.7200e0030.1479 9.0000e- 119.8655 004
0.1488 0.0392 8.3000e0040.0401 119.7975 119.7975
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Grading - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 1.7109 17.9359 14.7507 0.0297 0.7749 0.7749 0.7129 0.7129 2,872.691 0 2,872.691
0 0.9291 2,895.918
2 Total 1.7109 17.9359 14.7507 0.0297 0.9291 2,895.918
2 6.5523 0.7749 7.3273 3.3675 0.7129 4.0804
SO2 Fugitive
PM10
Exhaust
PM10
2,872.691
0 2,872.691
0 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.9000e0030.1578 0.0487 5.1000e0040.0135 1.9000e0040.0137 3.8900e0031.8000e0044.0700e00353.9148 53.9148 2.5900e00353.9796 Worker 0.0682 0.0446 0.4524 1.3400e0030.1643 1.0000e0030.1653 0.0436 9.2000e0040.0445 133.1084 133.1084 3.0200e003133.1839 Total 0.0731 0.2024 0.5011 1.8500e0035.6100e0030.1778 1.1900e- 187.1635 003
0.1790 0.0475 1.1000e0030.0486 187.0231 187.0231
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Fugitive Dust 2.9486 0.0000 2.9486 1.5154 0.0000 1.5154 0.0000 0.0000 Off-Road 1.7109 17.9359 14.7507 0.0297 0.7749 0.7749 0.7129 0.7129 0.0000 2,872.691 0 2,872.691
0 0.9291 2,895.918
2 Total 1.7109 17.9359 14.7507 0.0297 0.9291 2,895.918
2 2.9486 0.7749 3.7235 1.5154 0.7129 2.2283
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,872.691
0 2,872.691
0 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 4.9000e0030.1578 0.0487 5.1000e0040.0135 1.9000e0040.0137 3.8900e0031.8000e0044.0700e00353.9148 53.9148 2.5900e00353.9796 Worker 0.0682 0.0446 0.4524 1.3400e0030.1643 1.0000e0030.1653 0.0436 9.2000e0040.0445 133.1084 133.1084 3.0200e003133.1839 Total 0.0731 0.2024 0.5011 1.8500e0035.6100e0030.1778 1.1900e- 187.1635 003
0.1790 0.0475 1.1000e0030.0486 187.0231 187.0231
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.4 Paving - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.0327 10.1917 14.5842 0.0228 0.5102 0.5102 0.4694 0.4694 2,207.584 1 2,207.584
1 0.7140 2,225.433
6 Paving 0.7205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7532 10.1917 14.5842 0.0228 0.7140 2,225.433
6 0.5102 0.5102 0.4694 0.4694
SO2 Fugitive
PM10
Exhaust
PM10
2,207.584
1 2,207.584
1 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0511 0.0335 0.3393 1.0000e0030.1232 7.5000e0040.1240 0.0327 6.9000e0040.0334 99.8313 99.8313 2.2700e00399.8880 Total 0.0511 0.0335 0.3393 1.0000e0032.2700e0030.1232 7.5000e- 99.8880 004
0.1240 0.0327 6.9000e0040.0334 99.8313 99.8313
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.0327 10.1917 14.5842 0.0228 0.5102 0.5102 0.4694 0.4694 0.0000 2,207.584 1 2,207.584
1 0.7140 2,225.433
6 Paving 0.7205 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.7532 10.1917 14.5842 0.0228 0.7140 2,225.433
6 0.5102 0.5102 0.4694 0.4694
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,207.584
1 2,207.584
1 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0511 0.0335 0.3393 1.0000e0030.1232 7.5000e0040.1240 0.0327 6.9000e0040.0334 99.8313 99.8313 2.2700e00399.8880 Total 0.0511 0.0335 0.3393 1.0000e0032.2700e0030.1232 7.5000e- 99.8880 004
0.1240 0.0327 6.9000e0040.0334 99.8313 99.8313
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.5 Building Construction - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 1.5728 14.3849 16.2440 0.0269 0.6079 2,570.406
1 0.6997 0.6997 0.6584 0.6584
SO2 Fugitive
PM10
Exhaust
PM10
2,555.209
9 2,555.209
9 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0270 0.8679 0.2680 2.8000e0030.0744 1.0400e0030.0754 0.0214 1.0000e0030.0224 296.5311 296.5311 0.0143 296.8876 Worker 0.1875 0.1227 1.2440 3.6700e0030.4518 2.7600e0030.4546 0.1198 2.5400e0030.1224 366.0480 366.0480 8.3100e003366.2558 Total 0.2145 0.9906 1.5120 6.4700e0030.5262 3.8000e- 0.0226 663.1434 003
0.5300 0.1413 3.5400e0030.1448 662.5791 662.5791
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.5728 14.3849 16.2440 0.0269 0.6997 0.6997 0.6584 0.6584 0.0000 2,555.209 9 2,555.209
9 0.6079 2,570.406
1 Total 1.5728 14.3849 16.2440 0.0269 0.6079 2,570.406
1 0.6997 0.6997 0.6584 0.6584
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,555.209
9 2,555.209
9 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0270 0.8679 0.2680 2.8000e0030.0744 1.0400e0030.0754 0.0214 1.0000e0030.0224 296.5311 296.5311 0.0143 296.8876 Worker 0.1875 0.1227 1.2440 3.6700e0030.4518 2.7600e0030.4546 0.1198 2.5400e0030.1224 366.0480 366.0480 8.3100e003366.2558 Total 0.2145 0.9906 1.5120 6.4700e0030.5262 3.8000e- 0.0226 663.1434 003
0.5300 0.1413 3.5400e0030.1448 662.5791 662.5791
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.6 Architectural Coating - 2023
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 281.4481 281.4481 0.0168 281.8690 Total 18.0005 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0168 281.8690 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0375 0.0245 0.2488 7.3000e0040.0904 5.5000e0040.0909 0.0240 5.1000e0040.0245 73.2096 73.2096 1.6600e00373.2512 Total 0.0375 0.0245 0.2488 7.3000e0041.6600e0030.0904 5.5000e- 73.2512 004
0.0909 0.0240 5.1000e0040.0245 73.2096 73.2096
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1917 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0000 281.4481 281.4481 0.0168 281.8690 Total 18.0005 1.3030 1.8111 2.9700e0030.0708 0.0708 0.0708 0.0708 0.0168 281.8690 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0375 0.0245 0.2488 7.3000e0040.0904 5.5000e0040.0909 0.0240 5.1000e0040.0245 73.2096 73.2096 1.6600e00373.2512 Total 0.0375 0.0245 0.2488 7.3000e0041.6600e0030.0904 5.5000e- 73.2512 004
0.0909 0.0240 5.1000e0040.0245 73.2096 73.2096
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.6 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 17.9896 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0220 0.2284 7.1000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 70.2892 70.2892 1.4800e00370.3263 Total 0.0350 0.0220 0.2284 7.1000e0041.4800e0030.0904 5.4000e- 70.3263 004
0.0909 0.0240 4.9000e0040.0245 70.2892 70.2892
Agenda Item #5.5.
Hunter Subdivision Project - First Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 17.8088 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Total 17.9896 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0220 0.2284 7.1000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 70.2892 70.2892 1.4800e00370.3263 Total 0.0350 0.0220 0.2284 7.1000e0041.4800e0030.0904 5.4000e- 70.3263 004
0.0909 0.0240 4.9000e0040.0245 70.2892 70.2892
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Annual CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:42 AM
Hunter Subdivision Project - Second Year
Napa County, Annual
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2025
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2024 (March), with completion in November 2024.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced. Page 1866 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Annual Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 18.00 20.00
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 2/26/2025 11/8/2024
tblConstructionPhase PhaseEndDate 1/31/2025 10/11/2024
tblConstructionPhase PhaseStartDate 2/1/2025 10/12/2024 tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
5.00 55.00
tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Annual NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2.0 Emissions Summary
2.1 Overall Construction
Unmitigated Construction
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
Exhaust
PM10
PM10
Total
2024 0.2544 1.0927 1.3333 2.5400e0030.0389 0.0469 0.0858 0.0105 0.0441 0.0546 0.0000 221.6110 221.6110 0.0427 0.0000 222.6788 Maximum 0.2544 1.0927 1.3333 2.5400e0030.0389 0.0469 0.0858 0.0105 0.0441 0.0546 0.0427 0.0000 222.6788 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 221.6110 221.6110
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2024 0.2544 1.0927 1.3333 2.5400e0030.0389 0.0469 0.0858 0.0105 0.0441 0.0546 0.0000 221.6108 221.6108 0.0427 0.0000 222.6786 Maximum 0.2544 1.0927 1.3333 2.5400e0030.0389 0.0469 0.0858 0.0105 0.0441 0.0546 0.0000 221.6108 221.6108 0.0427 0.0000 222.6786 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Annual
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/18/2024 10/11/2024 5 150 2 Architectural Coating Architectural Coating 10/12/2024 11/8/2024 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
10.80 Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00
20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
10.80 7.30
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Annual NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2024
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Off-Road 0.1104 1.0083 1.2125 2.0200e0030.0460 0.0460 0.0433 0.0433 0.0000 173.8868 173.8868 0.0411 0.0000 174.9148 Total 0.1104 1.0083 1.2125 2.0200e0030.0460 0.0460 0.0433 0.0433 0.0411 0.0000 174.9148 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 173.8868 173.8868
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.8600e0030.0646 0.0175 2.1000e0045.4100e0037.0000e0055.4800e0031.5600e0037.0000e0051.6300e0030.0000 20.3524 20.3524 9.3000e0040.0000 20.3757 Worker 0.0119 7.4200e0030.0829 2.7000e0040.0326 2.0000e0040.0328 8.6700e0031.9000e0048.8600e0030.0000 24.1739 24.1739 5.0000e0040.0000 24.1865 Total 0.0138 0.0720 0.1005 4.8000e0041.4300e0030.0380 2.7000e- 0.0000 44.5622 004
0.0383 0.0102 2.6000e0040.0105 0.0000 44.5263 44.5263
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 0.1104 1.0083 1.2125 2.0200e0030.0460 0.0460 0.0433 0.0433 0.0000 173.8866 173.8866 0.0411 0.0000 174.9146 Total 0.1104 1.0083 1.2125 2.0200e0030.0460 0.0460 0.0433 0.0433 0.0411 0.0000 174.9146 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 173.8866 173.8866
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.8600e0030.0646 0.0175 2.1000e0045.4100e0037.0000e0055.4800e0031.5600e0037.0000e0051.6300e0030.0000 20.3524 20.3524 9.3000e0040.0000 20.3757 Worker 0.0119 7.4200e0030.0829 2.7000e0040.0326 2.0000e0040.0328 8.6700e0031.9000e0048.8600e0030.0000 24.1739 24.1739 5.0000e0040.0000 24.1865 Total 0.0138 0.0720 0.1005 4.8000e0041.4300e0030.0380 2.7000e- 0.0000 44.5622 004
0.0383 0.0102 2.6000e0040.0105 0.0000 44.5263 44.5263
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.8100e0030.0122 0.0181 3.0000e0056.1000e0046.1000e0046.1000e0046.1000e0040.0000 2.5533 2.5533 1.4000e0040.0000 2.5569 Total 0.1299 0.0122 0.0181 3.0000e0051.4000e0046.1000e- 0.0000 2.5569 004
6.1000e0046.1000e0046.1000e004
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2.5533 2.5533
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.2000e0042.0000e0042.2100e0031.0000e0058.7000e0041.0000e0058.7000e0042.3000e0040.0000 2.4000e0040.0000 0.6446 0.6446 1.0000e0050.0000 0.6450 Total 3.2000e0042.0000e0042.2100e0031.0000e0051.0000e0058.7000e- 0.0000 0.6450 004
1.0000e0058.7000e0042.3000e0040.0000 2.4000e0040.0000 0.6446 0.6446
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Annual SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.8100e0030.0122 0.0181 3.0000e0056.1000e0046.1000e0046.1000e0046.1000e0040.0000 2.5533 2.5533 1.4000e0040.0000 2.5568 Total 0.1299 0.0122 0.0181 3.0000e0051.4000e0046.1000e- 0.0000 2.5568 004
6.1000e0046.1000e0046.1000e004
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2.5533 2.5533
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.2000e0042.0000e0042.2100e0031.0000e0058.7000e0041.0000e0058.7000e0042.3000e0040.0000 2.4000e0040.0000 0.6446 0.6446 1.0000e0050.0000 0.6450 Total 3.2000e0042.0000e0042.2100e0031.0000e0051.0000e0058.7000e- 0.0000 0.6450 004
1.0000e0058.7000e0042.3000e0040.0000 2.4000e0040.0000 0.6446 0.6446
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Summer CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:46 AM
Hunter Subdivision Project - Second Year
Napa County, Summer
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2025
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2024 (March), with completion in November 2024.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced. Page 1874 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Summer Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 18.00 20.00
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 2/26/2025 11/8/2024
tblConstructionPhase PhaseEndDate 1/31/2025 10/11/2024
tblConstructionPhase PhaseStartDate 2/1/2025 10/12/2024 tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
5.00 55.00
tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Summer NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
Unmitigated Construction
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM10
PM10
Total
2024 13.0257 14.3844 17.5847 0.0336 0.5262 0.6170 1.1432 0.1413 0.5803 0.7216 0.0000 3,237.850 2 3,237.850
2 0.6255 0.0000 3,253.486
6 Maximum 13.0257 14.3844 17.5847 0.0336 0.6255 0.0000 3,253.486 6 0.5262 0.6170 1.1432 0.1413 0.5803 0.7216
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,237.850
2 3,237.850
2 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2024 13.0257 14.3844 17.5847 0.0336 0.5262 0.6170 1.1432 0.1413 0.5803 0.7216 0.0000 3,237.850 2 3,237.850
2 0.6255 0.0000 3,253.486
6 Maximum 13.0257 14.3844 17.5847 0.0336 0.5262 0.6170 1.1432 0.1413 0.5803 0.7216 0.0000 3,237.850 2 3,237.850
2 0.6255 0.0000 3,253.486
6 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Summer
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/18/2024 10/11/2024 5 150 2 Architectural Coating Architectural Coating 10/12/2024 11/8/2024 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
10.80 Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00
20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
10.80 7.30
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Summer NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2024
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Off-Road 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 1.4716 13.4438 16.1668 0.0270 0.6044 2,570.807
7 0.6133 0.6133 0.5769 0.5769
SO2 Fugitive
PM10
Exhaust
PM10
2,555.698
9 2,555.698
9 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0242 0.8537 0.2199 2.8500e0030.0744 9.8000e0040.0754 0.0214 9.3000e0040.0224 302.2028 302.2028 0.0132 302.5328 Worker 0.1661 0.0869 1.1980 3.8100e0030.4518 2.6900e0030.4545 0.1198 2.4700e0030.1223 379.9485 379.9485 7.9000e003380.1461 Total 0.1904 0.9406 1.4178 6.6600e0030.5262 3.6700e- 0.0211 682.6789 003
0.5299 0.1413 3.4000e0030.1447 682.1513 682.1513
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 0.0000 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 1.4716 13.4438 16.1668 0.0270 0.6044 2,570.807
7 0.6133 0.6133 0.5769 0.5769
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,555.698
9 2,555.698
9 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0242 0.8537 0.2199 2.8500e0030.0744 9.8000e0040.0754 0.0214 9.3000e0040.0224 302.2028 302.2028 0.0132 302.5328 Worker 0.1661 0.0869 1.1980 3.8100e0030.4518 2.6900e0030.4545 0.1198 2.4700e0030.1223 379.9485 379.9485 7.9000e003380.1461 Total 0.1904 0.9406 1.4178 6.6600e0030.5262 3.6700e- 0.0211 682.6789 003
0.5299 0.1413 3.4000e0030.1447 682.1513 682.1513
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 12.8117 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 12.9925 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0332 0.0174 0.2396 7.6000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 75.9897 75.9897 1.5800e00376.0292 Total 0.0332 0.0174 0.2396 7.6000e0041.5800e0030.0904 5.4000e- 76.0292 004
0.0909 0.0240 4.9000e0040.0245 75.9897 75.9897
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 12.8117 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Total 12.9925 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0332 0.0174 0.2396 7.6000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 75.9897 75.9897 1.5800e00376.0292 Total 0.0332 0.0174 0.2396 7.6000e0041.5800e0030.0904 5.4000e- 76.0292 004
0.0909 0.0240 4.9000e0040.0245 75.9897 75.9897
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Winter CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:47 AM
Hunter Subdivision Project - Second Year
Napa County, Winter
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2025
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2024 (March), with completion in November 2024.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced. Page 1882 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Winter Table Name Column Name Default Value New Value
tblConstructionPhase NumDays 18.00 20.00
tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 2/26/2025 11/8/2024
tblConstructionPhase PhaseEndDate 1/31/2025 10/11/2024
tblConstructionPhase PhaseStartDate 2/1/2025 10/12/2024 tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
5.00 55.00
tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Winter NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
Unmitigated Construction
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM10
PM10
Total
2024 13.0275 14.4132 17.5599 0.0333 0.5262 0.6170 1.1432 0.1413 0.5804 0.7216 0.0000 3,202.033 3 3,202.033
3 0.6261 0.0000 3,217.684
9 Maximum 13.0275 14.4132 17.5599 0.0333 0.6261 0.0000 3,217.684 9 0.5262 0.6170 1.1432 0.1413 0.5804 0.7216
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,202.033
3 3,202.033
3 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2024 13.0275 14.4132 17.5599 0.0333 0.5262 0.6170 1.1432 0.1413 0.5804 0.7216 0.0000 3,202.033 3 3,202.033
3 0.6261 0.0000 3,217.684
9 Maximum 13.0275 14.4132 17.5599 0.0333 0.5262 0.6170 1.1432 0.1413 0.5804 0.7216 0.0000 3,202.033 3 3,202.033
3 0.6261 0.0000 3,217.684
9 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Winter
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/18/2024 10/11/2024 5 150 2 Architectural Coating Architectural Coating 10/12/2024 11/8/2024 5 20 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
10.80 Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00
20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
10.80 7.30
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Winter NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2024
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Off-Road 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 1.4716 13.4438 16.1668 0.0270 0.6044 2,570.807
7 0.6133 0.6133 0.5769 0.5769
SO2 Fugitive
PM10
Exhaust
PM10
2,555.698
9 2,555.698
9 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0258 0.8592 0.2510 2.7800e0030.0744 1.0200e0030.0754 0.0214 9.7000e0040.0224 294.8883 294.8883 0.0143 295.2457 Worker 0.1752 0.1102 1.1422 3.5300e0030.4518 2.6900e0030.4545 0.1198 2.4700e0030.1223 351.4462 351.4462 7.4200e003351.6316 Total 0.2010 0.9694 1.3931 6.3100e0030.5262 3.7100e- 0.0217 646.8772 003
0.5299 0.1413 3.4400e0030.1447 646.3344 646.3344
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.4716 13.4438 16.1668 0.0270 0.6133 0.6133 0.5769 0.5769 0.0000 2,555.698 9 2,555.698
9 0.6044 2,570.807
7 Total 1.4716 13.4438 16.1668 0.0270 0.6044 2,570.807
7 0.6133 0.6133 0.5769 0.5769
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,555.698
9 2,555.698
9 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0258 0.8592 0.2510 2.7800e0030.0744 1.0200e0030.0754 0.0214 9.7000e0040.0224 294.8883 294.8883 0.0143 295.2457 Worker 0.1752 0.1102 1.1422 3.5300e0030.4518 2.6900e0030.4545 0.1198 2.4700e0030.1223 351.4462 351.4462 7.4200e003351.6316 Total 0.2010 0.9694 1.3931 6.3100e0030.5262 3.7100e- 0.0217 646.8772 003
0.5299 0.1413 3.4400e0030.1447 646.3344 646.3344
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2024
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 12.8117 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 281.4481 281.4481 0.0159 281.8443 Total 12.9925 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0220 0.2284 7.1000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 70.2892 70.2892 1.4800e00370.3263 Total 0.0350 0.0220 0.2284 7.1000e0041.4800e0030.0904 5.4000e- 70.3263 004
0.0909 0.0240 4.9000e0040.0245 70.2892 70.2892
Agenda Item #5.5.
Hunter Subdivision Project - Second Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 12.8117 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1808 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0000 281.4481 281.4481 0.0159 281.8443 Total 12.9925 1.2188 1.8101 2.9700e0030.0609 0.0609 0.0609 0.0609 0.0159 281.8443 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0350 0.0220 0.2284 7.1000e0040.0904 5.4000e0040.0909 0.0240 4.9000e0040.0245 70.2892 70.2892 1.4800e00370.3263 Total 0.0350 0.0220 0.2284 7.1000e0041.4800e0030.0904 5.4000e- 70.3263 004
0.0909 0.0240 4.9000e0040.0245 70.2892 70.2892
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Annual Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences, 2 ADUs, and 25 low income units. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2025 (March), with completion in February 2026.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
64 Climate Zone 4 Operational Year 2026
Utility Company Pacific Gas & Electric Company
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Condo/Townhouse 25.00 Dwelling Unit 1.56 25,000.00 62
Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:57 AM
Hunter Subdivision Project - Third Year
Napa County, Annual
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Annual tblTripsAndVMT WorkerTripNumber 23.00 55.00
tblTripsAndVMT WorkerTripNumber 5.00 11.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 4.00 11.00
tblLandUse Population 6.00 5.00
tblLandUse Population 72.00 62.00
Table Name Column Name Default Value New Value
Grading - Assumed site would be balanced. Page 1891 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Annual
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10
Maximum 0.3227 1.3947 1.8018 3.4500e- 0.0527 0.0552 0.1079 0.0142 0.0520 0.0662 0.0000 301.4075 301.4075 0.0586 0.0000 302.8732 003
0.0000 34.5691 34.5691 6.3300e0036.3600e- 0.0000 34.7273 003
6.3100e0030.0127 1.7100e0035.9600e0037.6700e0032026 0.3227 0.1578 0.2076 4.0000e004 2025 0.1602 1.3947 1.8018 3.4500e- 0.0527 0.0552 0.1079 0.0142 0.0520 0.0662 0.0000 301.4075 301.4075 0.0586 0.0000 302.8732 003
Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 301.4078 301.4078
PM2.5
Total
Bio- CO2 NBio- CO2
Maximum 0.3227 1.3948 1.8018 3.4500e- 0.0527 0.0552 0.1079 0.0142 0.0520 0.0662 0.0586 0.0000 302.8735 003
0.0000 34.5691 34.5691 6.3300e0036.3600e- 0.0000 34.7274 003
6.3100e0030.0127 1.7100e0035.9600e0037.6700e0032026 0.3227 0.1578 0.2076 4.0000e004 2025 0.1602 1.3948 1.8018 3.4500e- 0.0527 0.0552 0.1079 0.0142 0.0520 0.0662 0.0000 301.4078 301.4078 0.0586 0.0000 302.8735 003
NBio- CO2 Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2.0 Emissions Summary
2.1 Overall Construction
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Annual
10.80 7.30 20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 87,480; Residential Outdoor: 29,160; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 230
2 Architectural Coating Architectural Coating 1/31/2026 2/25/2026 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/17/2025 1/30/2026 5
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Annual
0.0000 60.2115 60.2115 1.9300e0030.0527 3.7000e- 0.0000 60.2598 004
0.0531 0.0142 3.5000e004Total 0.0180 0.0979 0.1290 6.5000e- 0.0146 004
0.0000 32.1444 32.1444 6.3000e0040.0452 2.7000e- 0.0000 32.1601 004
0.0455 0.0120 2.5000e004Worker 0.0155 9.3000e- 0.0123
003
0.1059 3.6000e004
0.0000 28.0672 28.0672 1.3000e0037.5000e- 0.0000 28.0997 003
1.0000e0047.6000e0032.1700e0031.0000e0042.2700e003Vendor 2.4900e0030.0886 0.0231 2.9000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 241.1962 241.1962
PM2.5
Total
Bio- CO2 NBio- CO2
Total 0.1422 1.2969 1.6728 2.8000e- 0.0549 0.0549 0.0516 0.0516 0.0567 0.0000 242.6137 003
Off-Road 0.1422 1.2969 1.6728 2.8000e- 0.0549 0.0549 0.0516 0.0516 0.0000 241.1962 241.1962 0.0567 0.0000 242.6137 003
NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2025
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Annual
0.0000 60.2115 60.2115 1.9300e0030.0527 3.7000e- 0.0000 60.2598 004
0.0531 0.0142 3.5000e004Total 0.0180 0.0979 0.1290 6.5000e- 0.0146 004
0.0000 32.1444 32.1444 6.3000e0040.0452 2.7000e- 0.0000 32.1601 004
0.0455 0.0120 2.5000e004Worker 0.0155 9.3000e- 0.0123
003
0.1059 3.6000e004
0.0000 28.0672 28.0672 1.3000e0037.5000e- 0.0000 28.0997 003
1.0000e0047.6000e0032.1700e0031.0000e0042.2700e003Vendor 2.4900e0030.0886 0.0231 2.9000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 241.1959 241.1959
PM2.5
Total
Bio- CO2 NBio- CO2
Total 0.1422 1.2969 1.6728 2.8000e- 0.0549 0.0549 0.0516 0.0516 0.0567 0.0000 242.6134 003
Off-Road 0.1422 1.2969 1.6728 2.8000e- 0.0549 0.0549 0.0516 0.0516 0.0000 241.1959 241.1959 0.0567 0.0000 242.6134 003
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Annual
0.0000 6.2247 6.2247 2.0000e0045.5700e- 0.0000 6.2297
003
4.0000e0055.6100e0031.5000e0034.0000e0051.5400e003Total 1.7900e0030.0102 0.0127 7.0000e005
0.0000 3.2714 3.2714 6.0000e0054.7800e- 0.0000 3.2729
003
3.0000e0054.8100e0031.2700e0033.0000e0051.3000e003Worker 1.5400e0039.0000e0040.0104 4.0000e005
0.0000 2.9533 2.9533 1.4000e0047.9000e- 0.0000 2.9568
004
1.0000e0058.0000e0042.3000e0041.0000e0052.4000e004Vendor 2.5000e0049.2700e0032.3400e0033.0000e005 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 25.5111 25.5111
PM2.5
Total
Bio- CO2 NBio- CO2
6.0000e0035.8000e- 0.0000 25.6611
003
5.8000e0035.4600e0035.4600e003Total 0.0150 0.1372 0.1769 3.0000e004
0.0000 25.5111 25.5111 6.0000e0035.8000e- 0.0000 25.6611 003
5.8000e0035.4600e0035.4600e003Off-Road 0.0150 0.1372 0.1769 3.0000e004 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.2 Building Construction - 2026 Page 1896 of 4422
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Annual
0.0000 6.2247 6.2247 2.0000e0045.5700e- 0.0000 6.2297
003
4.0000e0055.6100e0031.5000e0034.0000e0051.5400e003Total 1.7900e0030.0102 0.0127 7.0000e005
0.0000 3.2714 3.2714 6.0000e0054.7800e- 0.0000 3.2729
003
3.0000e0054.8100e0031.2700e0033.0000e0051.3000e003Worker 1.5400e0039.0000e0040.0104 4.0000e005
0.0000 2.9533 2.9533 1.4000e0047.9000e- 0.0000 2.9568
004
1.0000e0058.0000e0042.3000e0041.0000e0052.4000e004Vendor 2.5000e0049.2700e0032.3400e0033.0000e005 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 25.5111 25.5111
PM2.5
Total
Bio- CO2 NBio- CO2
6.0000e0035.8000e- 0.0000 25.6610
003
5.8000e0035.4600e0035.4600e003Total 0.0150 0.1372 0.1769 3.0000e004
0.0000 25.5111 25.5111 6.0000e0035.8000e- 0.0000 25.6610 003
5.8000e0035.4600e0035.4600e003Off-Road 0.0150 0.1372 0.1769 3.0000e004 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Annual
0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.5000e0041.5000e0041.7000e0031.0000e005
0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.5000e0041.5000e0041.7000e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2.2979 2.2979
PM2.5
Total
Bio- CO2 NBio- CO2
1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Total 0.3056 0.0103 0.0163 3.0000e005
0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.3041 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2026 Page 1898 of 4422
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Annual
0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.5000e0041.5000e0041.7000e0031.0000e005
0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.5000e0041.5000e0041.7000e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2.2979 2.2979
PM2.5
Total
Bio- CO2 NBio- CO2
1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Total 0.3056 0.0103 0.0163 3.0000e005
0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.3041 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Summer CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 9:58 AM
Hunter Subdivision Project - Third Year
Napa County, Summer
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
Condo/Townhouse 25.00 Dwelling Unit 1.56 25,000.00 62
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2026
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences, 2 ADUs, and 25 low income units. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2025 (March), with completion in February 2026.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units. Page 1900 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Summer Grading - Assumed site would be balanced.
Table Name Column Name Default Value New Value
tblLandUse Population 6.00 5.00
tblLandUse Population 72.00 62.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 4.00 11.00
23.00 55.00
tblTripsAndVMT WorkerTripNumber 5.00 11.00
tblTripsAndVMT WorkerTripNumber
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Summer NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
Unmitigated Construction
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM10
PM10
Total
2025 1.5466 13.3933 17.3981 0.0334 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,221.349 5 3,221.349
5 0.6214 0.0000 3,236.883
9 2026 33.9894 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 0.0000 3,206.023 4 3,206.023
4 0.6208 0.0000 3,221.542
9 Maximum 33.9894 13.3933 17.3981 0.0334 0.6214 0.0000 3,236.883 9 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,221.349
5 3,221.349
5 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2025 1.5466 13.3933 17.3981 0.0334 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,221.349 5 3,221.349
5 0.6214 0.0000 3,236.883
9 2026 33.9894 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 0.0000 3,206.023 4 3,206.023
4 0.6208 0.0000 3,221.542
9 Maximum 33.9894 13.3933 17.3981 0.0334 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,221.349 5 3,221.349
5 0.6214 0.0000 3,236.883
9 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Summer
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/17/2025 1/30/2026 5 230 2 Architectural Coating Architectural Coating 1/31/2026 2/25/2026 5 18 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 87,480; Residential Outdoor: 29,160; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
10.80 Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00
20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
10.80 7.30
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Summer NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2025
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0234 0.8450 0.2088 2.8300e0030.0744 9.6000e0040.0754 0.0214 9.2000e0040.0223 300.5382 300.5382 0.0133 300.8708 Worker 0.1558 0.0786 1.1046 3.6500e0030.4518 2.6300e0030.4545 0.1198 2.4200e0030.1223 364.3369 364.3369 7.1200e003364.5150 Total 0.1792 0.9236 1.3135 6.4800e0030.5262 3.5900e- 0.0204 665.3858 003
0.5298 0.1413 3.3400e0030.1446 664.8751 664.8751
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0234 0.8450 0.2088 2.8300e0030.0744 9.6000e0040.0754 0.0214 9.2000e0040.0223 300.5382 300.5382 0.0133 300.8708 Worker 0.1558 0.0786 1.1046 3.6500e0030.4518 2.6300e0030.4545 0.1198 2.4200e0030.1223 364.3369 364.3369 7.1200e003364.5150 Total 0.1792 0.9236 1.3135 6.4800e0030.5262 3.5900e- 0.0204 665.3858 003
0.5298 0.1413 3.3400e0030.1446 664.8751 664.8751
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.2 Building Construction - 2026
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0226 0.8359 0.2000 2.8200e0030.0744 9.4000e0040.0754 0.0214 9.0000e0040.0223 298.9825 298.9825 0.0134 299.3167 Worker 0.1468 0.0716 1.0252 3.5200e0030.4518 2.5500e0030.4544 0.1198 2.3500e0030.1222 350.5666 350.5666 6.4600e003350.7281 Total 0.1694 0.9075 1.2252 6.3400e0030.5262 3.4900e- 0.0198 650.0448 003
0.5297 0.1413 3.2500e0030.1445 649.5491 649.5491
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0226 0.8359 0.2000 2.8200e0030.0744 9.4000e0040.0754 0.0214 9.0000e0040.0223 298.9825 298.9825 0.0134 299.3167 Worker 0.1468 0.0716 1.0252 3.5200e0030.4518 2.5500e0030.4544 0.1198 2.3500e0030.1222 350.5666 350.5666 6.4600e003350.7281 Total 0.1694 0.9075 1.2252 6.3400e0030.5262 3.4900e- 0.0198 650.0448 003
0.5297 0.1413 3.2500e0030.1445 649.5491 649.5491
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2026
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 33.7892 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 33.9600 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0154 281.8319 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0294 0.0143 0.2050 7.0000e0040.0904 5.1000e0040.0909 0.0240 4.7000e0040.0244 70.1133 70.1133 1.2900e00370.1456 Total 0.0294 0.0143 0.2050 7.0000e0041.2900e0030.0904 5.1000e- 70.1456 004
0.0909 0.0240 4.7000e0040.0244 70.1133 70.1133
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Summer SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 33.7892 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 Total 33.9600 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0154 281.8319 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0294 0.0143 0.2050 7.0000e0040.0904 5.1000e0040.0909 0.0240 4.7000e0040.0244 70.1133 70.1133 1.2900e00370.1456 Total 0.0294 0.0143 0.2050 7.0000e0041.2900e0030.0904 5.1000e- 70.1456 004
0.0909 0.0240 4.7000e0040.0244 70.1133 70.1133
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Winter CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:01 AM
Hunter Subdivision Project - Third Year
Napa County, Winter
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
Condo/Townhouse 25.00 Dwelling Unit 1.56 25,000.00 62
Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) 64 Climate Zone 4 Operational Year 2026
Utility Company Pacific Gas & Electric Company
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences, 2 ADUs, and 25 low income units. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2025 (March), with completion in February 2026.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units. Page 1910 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Winter Grading - Assumed site would be balanced.
Table Name Column Name Default Value New Value
tblLandUse Population 6.00 5.00
tblLandUse Population 72.00 62.00
tblLandUse Population 26.00 22.00
tblTripsAndVMT VendorTripNumber 4.00 11.00
23.00 55.00
tblTripsAndVMT WorkerTripNumber 5.00 11.00
tblTripsAndVMT WorkerTripNumber
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Winter NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission)
Unmitigated Construction
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
Exhaust
PM10
PM10
Total
2025 1.5568 13.4194 17.3733 0.0331 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,186.766 2 3,186.766
2 0.6220 0.0000 3,202.317
0 2026 33.9911 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 0.0000 3,172.522 1 3,172.522
1 0.6215 0.0000 3,188.058
8 Maximum 33.9911 13.4194 17.3733 0.0331 0.6220 0.0000 3,202.317 0 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,186.766
2 3,186.766
2 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
2025 1.5568 13.4194 17.3733 0.0331 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,186.766 2 3,186.766
2 0.6220 0.0000 3,202.317
0 2026 33.9911 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 0.0000 3,172.522 1 3,172.522
1 0.6215 0.0000 3,188.058
8 Maximum 33.9911 13.4194 17.3733 0.0331 0.5262 0.5312 1.0574 0.1413 0.4996 0.6409 0.0000 3,186.766 2 3,186.766
2 0.6220 0.0000 3,202.317
0 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Winter
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/17/2025 1/30/2026 5 230 2 Architectural Coating Architectural Coating 1/31/2026 2/25/2026 5 18 Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 87,480; Residential Outdoor: 29,160; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
10.80 Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00
20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
10.80 7.30
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Winter NOx CO SO2 Fugitive
PM10
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2025
Unmitigated Construction On-Site
ROG NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0249 0.8501 0.2383 2.7600e0030.0744 1.0000e0030.0754 0.0214 9.6000e0040.0224 293.2796 293.2796 0.0144 293.6400 Worker 0.1645 0.0996 1.0503 3.3800e0030.4518 2.6300e0030.4545 0.1198 2.4200e0030.1223 337.0123 337.0123 6.6600e003337.1789 Total 0.1894 0.9497 1.2887 6.1400e0030.5262 3.6300e- 0.0211 630.8189 003
0.5299 0.1413 3.3800e0030.1446 630.2919 630.2919
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0249 0.8501 0.2383 2.7600e0030.0744 1.0000e0030.0754 0.0214 9.6000e0040.0224 293.2796 293.2796 0.0144 293.6400 Worker 0.1645 0.0996 1.0503 3.3800e0030.4518 2.6300e0030.4545 0.1198 2.4200e0030.1223 337.0123 337.0123 6.6600e003337.1789 Total 0.1894 0.9497 1.2887 6.1400e0030.5262 3.6300e- 0.0211 630.8189 003
0.5299 0.1413 3.3800e0030.1446 630.2919 630.2919
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.2 Building Construction - 2026
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0241 0.8406 0.2282 2.7500e0030.0744 9.8000e0040.0754 0.0214 9.4000e0040.0224 291.7753 291.7753 0.0145 292.1376 Worker 0.1554 0.0907 0.9723 3.2500e0030.4518 2.5500e0030.4544 0.1198 2.3500e0030.1222 324.2724 324.2724 6.0300e003324.4231 Total 0.1795 0.9314 1.2005 6.0000e0030.5262 3.5300e- 0.0205 616.5607 003
0.5298 0.1413 3.2900e0030.1446 616.0477 616.0477
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.6010 2,571.498
1 0.5276 0.5276 0.4963 0.4963
SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,556.474
4 2,556.474
4 PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0241 0.8406 0.2282 2.7500e0030.0744 9.8000e0040.0754 0.0214 9.4000e0040.0224 291.7753 291.7753 0.0145 292.1376 Worker 0.1554 0.0907 0.9723 3.2500e0030.4518 2.5500e0030.4544 0.1198 2.3500e0030.1222 324.2724 324.2724 6.0300e003324.4231 Total 0.1795 0.9314 1.2005 6.0000e0030.5262 3.5300e- 0.0205 616.5607 003
0.5298 0.1413 3.2900e0030.1446 616.0477 616.0477
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2026
Unmitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 33.7892 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 33.9600 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0154 281.8319 SO2 Fugitive
PM10
Exhaust
PM10
281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0311 0.0182 0.1945 6.5000e0040.0904 5.1000e0040.0909 0.0240 4.7000e0040.0244 64.8545 64.8545 1.2100e00364.8846 Total 0.0311 0.0182 0.1945 6.5000e0041.2100e0030.0904 5.1000e- 64.8846 004
0.0909 0.0240 4.7000e0040.0244 64.8545 64.8545
Agenda Item #5.5.
Hunter Subdivision Project - Third Year - Napa County, Winter SO2 Fugitive
PM10
Exhaust
PM10
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Archit. Coating 33.7892 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 Total 33.9600 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 0.0154 281.8319 SO2 Fugitive
PM10
Exhaust
PM10
0.0000 281.4481 281.4481
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0311 0.0182 0.1945 6.5000e0040.0904 5.1000e0040.0909 0.0240 4.7000e0040.0244 64.8545 64.8545 1.2100e00364.8846 Total 0.0311 0.0182 0.1945 6.5000e0041.2100e0030.0904 5.1000e- 64.8846 004
0.0909 0.0240 4.7000e0040.0244 64.8545 64.8545
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Annual Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced.
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2026 (March), with completion in November 2026.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
64 Climate Zone 4 Operational Year 2027
Utility Company Pacific Gas & Electric Company
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:30 AM
Hunter Subdivision Project - Fourth Year
Napa County, Annual
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Annual tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/5/2027 10/16/2026
tblConstructionPhase PhaseStartDate 2/6/2027 10/17/2026 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/3/2027 11/11/2026
Table Name Column Name Default Value New Value
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Annual
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10
Maximum 0.2447 1.0150 1.3110 2.5100e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 219.2138 219.2138 0.0424 0.0000 220.2732 003
2026 0.2447 1.0150 1.3110 2.5100e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 219.2138 219.2138 0.0424 0.0000 220.2732 003
Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Maximum 0.2447 1.0150 1.3110 2.5100e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 219.2140 219.2140 0.0424 0.0000 220.2734 003
2026 0.2447 1.0150 1.3110 2.5100e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 219.2140 219.2140 0.0424 0.0000 220.2734 003
CH4 N2O CO2e
Year tons/yr MT/yr
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
2.0 Emissions Summary
2.1 Overall Construction Page 1922 of 4422
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Annual
10.80 7.30 20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/17/2026 11/11/2026 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/23/2026 10/16/2026 5
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Annual
0.0000 42.4411 42.4411 1.3500e0030.0380 2.6000e- 0.0000 42.4750 004
0.0383 0.0102 2.5000e004Total 0.0123 0.0693 0.0867 4.6000e- 0.0105 004
0.0000 22.3047 22.3047 4.1000e0040.0326 1.9000e- 0.0000 22.3150 004
0.0328 8.6700e0031.8000e0048.8500e003Worker 0.0105 6.1100e0030.0708 2.5000e004
0.0000 20.1364 20.1364 9.4000e0045.4100e- 0.0000 20.1600 003
7.0000e0055.4800e0031.5600e0037.0000e0051.6300e003Vendor 1.7400e0030.0632 0.0160 2.1000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9396 173.9396 0.0409 0.0000 174.9618 003
Off-Road 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9396 173.9396 0.0409 0.0000 174.9618 003
NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Annual
0.0000 42.4411 42.4411 1.3500e0030.0380 2.6000e- 0.0000 42.4750 004
0.0383 0.0102 2.5000e004Total 0.0123 0.0693 0.0867 4.6000e- 0.0105 004
0.0000 22.3047 22.3047 4.1000e0040.0326 1.9000e- 0.0000 22.3150 004
0.0328 8.6700e0031.8000e0048.8500e003Worker 0.0105 6.1100e0030.0708 2.5000e004
0.0000 20.1364 20.1364 9.4000e0045.4100e- 0.0000 20.1600 003
7.0000e0055.4800e0031.5600e0037.0000e0051.6300e003Vendor 1.7400e0030.0632 0.0160 2.1000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9394 173.9394 0.0409 0.0000 174.9616 003
Off-Road 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9394 173.9394 0.0409 0.0000 174.9616 003
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Annual
0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.5000e0041.5000e0041.7000e0031.0000e005
0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.5000e0041.5000e0041.7000e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Total 0.1297 0.0103 0.0163 3.0000e005
0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Annual
0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.5000e0041.5000e0041.7000e0031.0000e005
0.0000 0.5353 0.5353 1.0000e0057.8000e- 0.0000 0.5356
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.5000e0041.5000e0041.7000e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Total 0.1297 0.0103 0.0163 3.0000e005
0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Summer Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced.
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2026 (March), with completion in November 2026.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
64 Climate Zone 4 Operational Year 2027
Utility Company Pacific Gas & Electric Company
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:32 AM
Hunter Subdivision Project - Fourth Year
Napa County, Summer
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Summer tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/5/2027 10/16/2026
tblConstructionPhase PhaseStartDate 2/6/2027 10/17/2026 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/3/2027 11/11/2026
Table Name Column Name Default Value New Value
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Summer
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10
0.0000 3,206.023
4 3,206.023
4 0.6208 0.0000 3,221.542
9 Maximum 14.4355 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408
0.0000 3,206.023
4 3,206.023
4 0.6208 0.0000 3,221.542
9 2026 14.4355 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,206.023
4 3,206.023
4 0.6208 0.0000 3,221.542
9 Maximum 14.4355 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408
0.0000 3,206.023
4 3,206.023
4 0.6208 0.0000 3,221.542
9 2026 14.4355 13.3772 17.3098 0.0333 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission) Page 1930 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Summer
10.80 7.30 20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/17/2026 11/11/2026 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/23/2026 10/16/2026 5
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Summer
0.5262 3.4900e- 649.5491 649.5491 0.0198 650.0448
003
0.5297 0.1413 3.2500e003Total 0.1694 0.9075 1.2252 6.3400e- 0.1445 003
350.5666 350.5666 6.4600e0030.4518 2.5500e- 350.7281
003
0.4544 0.1198 2.3500e003Worker 0.1468 0.0716 1.0252 3.5200e- 0.1222 003
0.0744 9.4000e- 298.9825 298.9825 0.0134 299.3167
004
0.0754 0.0214 9.0000e004Vendor 0.0226 0.8359 0.2000 2.8200e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Summer
0.5262 3.4900e- 649.5491 649.5491 0.0198 650.0448
003
0.5297 0.1413 3.2500e003Total 0.1694 0.9075 1.2252 6.3400e- 0.1445 003
350.5666 350.5666 6.4600e0030.4518 2.5500e- 350.7281
003
0.4544 0.1198 2.3500e003Worker 0.1468 0.0716 1.0252 3.5200e- 0.1222 003
0.0744 9.4000e- 298.9825 298.9825 0.0134 299.3167
004
0.0754 0.0214 9.0000e004Vendor 0.0226 0.8359 0.2000 2.8200e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963
0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Summer
70.1133 70.1133 1.2900e0030.0904 5.1000e- 70.1456
004
0.0909 0.0240 4.7000e004Total 0.0294 0.0143 0.2050 7.0000e- 0.0244 004
70.1133 70.1133 1.2900e0030.0904 5.1000e- 70.1456
004
0.0909 0.0240 4.7000e004Worker 0.0294 0.0143 0.2050 7.0000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Summer
70.1133 70.1133 1.2900e0030.0904 5.1000e- 70.1456
004
0.0909 0.0240 4.7000e004Total 0.0294 0.0143 0.2050 7.0000e- 0.0244 004
70.1133 70.1133 1.2900e0030.0904 5.1000e- 70.1456
004
0.0909 0.0240 4.7000e004Worker 0.0294 0.0143 0.2050 7.0000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Winter Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced.
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2026 (March), with completion in November 2026.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
64 Climate Zone 4 Operational Year 2027
Utility Company Pacific Gas & Electric Company
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:33 AM
Hunter Subdivision Project - Fourth Year
Napa County, Winter
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Winter tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/5/2027 10/16/2026
tblConstructionPhase PhaseStartDate 2/6/2027 10/17/2026 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/3/2027 11/11/2026
Table Name Column Name Default Value New Value
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Winter
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10
0.0000 3,172.522
1 3,172.522
1 0.6215 0.0000 3,188.058
8 Maximum 14.4372 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408
0.0000 3,172.522
1 3,172.522
1 0.6215 0.0000 3,188.058
8 2026 14.4372 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,172.522
1 3,172.522
1 0.6215 0.0000 3,188.058
8 Maximum 14.4372 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408
0.0000 3,172.522
1 3,172.522
1 0.6215 0.0000 3,188.058
8 2026 14.4372 13.4010 17.2851 0.0330 0.5262 0.5311 1.0573 0.1413 0.4995 0.6408 CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission) Page 1938 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Winter
10.80 7.30 20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/17/2026 11/11/2026 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/23/2026 10/16/2026 5
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Winter
0.5262 3.5300e- 616.0477 616.0477 0.0205 616.5607
003
0.5298 0.1413 3.2900e003Total 0.1795 0.9314 1.2005 6.0000e- 0.1446 003
324.2724 324.2724 6.0300e0030.4518 2.5500e- 324.4231
003
0.4544 0.1198 2.3500e003Worker 0.1554 0.0907 0.9723 3.2500e- 0.1222 003
0.0744 9.8000e- 291.7753 291.7753 0.0145 292.1376
004
0.0754 0.0214 9.4000e004Vendor 0.0241 0.8406 0.2282 2.7500e- 0.0224 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Winter
0.5262 3.5300e- 616.0477 616.0477 0.0205 616.5607
003
0.5298 0.1413 3.2900e003Total 0.1795 0.9314 1.2005 6.0000e- 0.1446 003
324.2724 324.2724 6.0300e0030.4518 2.5500e- 324.4231
003
0.4544 0.1198 2.3500e003Worker 0.1554 0.0907 0.9723 3.2500e- 0.1222 003
0.0744 9.8000e- 291.7753 291.7753 0.0145 292.1376
004
0.0754 0.0214 9.4000e004Vendor 0.0241 0.8406 0.2282 2.7500e- 0.0224 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963
0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Winter
64.8545 64.8545 1.2100e0030.0904 5.1000e- 64.8846
004
0.0909 0.0240 4.7000e004Total 0.0311 0.0182 0.1945 6.5000e- 0.0244 004
64.8545 64.8545 1.2100e0030.0904 5.1000e- 64.8846
004
0.0909 0.0240 4.7000e004Worker 0.0311 0.0182 0.1945 6.5000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2026
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fourth Year - Napa County, Winter
64.8545 64.8545 1.2100e0030.0904 5.1000e- 64.8846
004
0.0909 0.0240 4.7000e004Total 0.0311 0.0182 0.1945 6.5000e- 0.0244 004
64.8545 64.8545 1.2100e0030.0904 5.1000e- 64.8846
004
0.0909 0.0240 4.7000e004Worker 0.0311 0.0182 0.1945 6.5000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Annual Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced.
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2027 (March), with completion in November 2027.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
64 Climate Zone 4 Operational Year 2028
Utility Company Pacific Gas & Electric Company
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:38 AM
Hunter Subdivision Project - Fifth Year
Napa County, Annual
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Annual tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/4/2028 10/15/2027
tblConstructionPhase PhaseStartDate 2/5/2028 10/16/2027 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/1/2028 11/10/2027
Table Name Column Name Default Value New Value
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Annual
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10
Maximum 0.2440 1.0137 1.3052 2.5000e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 218.3153 218.3153 0.0423 0.0000 219.3738 003
2027 0.2440 1.0137 1.3052 2.5000e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 218.3153 218.3153 0.0423 0.0000 219.3738 003
Total CO2 CH4 N2O CO2e
Year tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Maximum 0.2440 1.0137 1.3052 2.5000e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 218.3155 218.3155 0.0423 0.0000 219.3740 003
2027 0.2440 1.0137 1.3052 2.5000e- 0.0388 0.0403 0.0791 0.0104 0.0379 0.0484 0.0000 218.3155 218.3155 0.0423 0.0000 219.3740 003
CH4 N2O CO2e
Year tons/yr MT/yr
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
2.0 Emissions Summary
2.1 Overall Construction Page 1946 of 4422
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Annual
10.80 7.30 20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/16/2027 11/10/2027 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/22/2027 10/15/2027 5
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Annual
0.0000 41.5614 41.5614 1.3200e0030.0380 2.5000e- 0.0000 41.5944 004
0.0383 0.0102 2.4000e004Total 0.0116 0.0680 0.0810 4.5000e- 0.0105 004
0.0000 21.5249 21.5249 3.7000e0040.0326 1.8000e- 0.0000 21.5342 004
0.0328 8.6700e0031.7000e0048.8400e003Worker 9.9000e0035.5700e0030.0657 2.4000e004
0.0000 20.0365 20.0365 9.5000e0045.4100e- 0.0000 20.0601 003
7.0000e0055.4800e0031.5600e0037.0000e0051.6300e003Vendor 1.6900e0030.0625 0.0153 2.1000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9396 173.9396 0.0409 0.0000 174.9618 003
Off-Road 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9396 173.9396 0.0409 0.0000 174.9618 003
NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2027
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Annual
0.0000 41.5614 41.5614 1.3200e0030.0380 2.5000e- 0.0000 41.5944 004
0.0383 0.0102 2.4000e004Total 0.0116 0.0680 0.0810 4.5000e- 0.0105 004
0.0000 21.5249 21.5249 3.7000e0040.0326 1.8000e- 0.0000 21.5342 004
0.0328 8.6700e0031.7000e0048.8400e003Worker 9.9000e0035.5700e0030.0657 2.4000e004
0.0000 20.0365 20.0365 9.5000e0045.4100e- 0.0000 20.0601 003
7.0000e0055.4800e0031.5600e0037.0000e0051.6300e003Vendor 1.6900e0030.0625 0.0153 2.1000e004 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9394 173.9394 0.0409 0.0000 174.9616 003
Off-Road 0.1026 0.9352 1.2064 2.0200e- 0.0396 0.0396 0.0372 0.0372 0.0000 173.9394 173.9394 0.0409 0.0000 174.9616 003
Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Annual
0.0000 0.5166 0.5166 1.0000e0057.8000e- 0.0000 0.5168
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.4000e0041.3000e0041.5800e0031.0000e005
0.0000 0.5166 0.5166 1.0000e0057.8000e- 0.0000 0.5168
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.4000e0041.3000e0041.5800e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Total 0.1297 0.0103 0.0163 3.0000e005
0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2027
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Annual
0.0000 0.5166 0.5166 1.0000e0057.8000e- 0.0000 0.5168
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Total 2.4000e0041.3000e0041.5800e0031.0000e005
0.0000 0.5166 0.5166 1.0000e0057.8000e- 0.0000 0.5168
004
0.0000 7.9000e0042.1000e0040.0000 2.1000e004Worker 2.4000e0041.3000e0041.5800e0031.0000e005 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Total 0.1297 0.0103 0.0163 3.0000e005
0.0000 2.2979 2.2979 1.3000e0044.6000e- 0.0000 2.3011
004
4.6000e0044.6000e0044.6000e004Off-Road 1.5400e0030.0103 0.0163 3.0000e005 Archit. Coating 0.1281 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Summer Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced.
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2027 (March), with completion in November 2027.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
64 Climate Zone 4 Operational Year 2028
Utility Company Pacific Gas & Electric Company
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:40 AM
Hunter Subdivision Project - Fifth Year
Napa County, Summer
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Summer tblTripsAndVMT WorkerTripNumber 1.00 11.00
tblTripsAndVMT VendorTripNumber 1.00 11.00
tblTripsAndVMT WorkerTripNumber 5.00 55.00
tblLandUse Population 6.00 5.00
tblLandUse Population 26.00 22.00
tblConstructionPhase PhaseEndDate 2/4/2028 10/15/2027
tblConstructionPhase PhaseStartDate 2/5/2028 10/16/2027 tblConstructionPhase NumDays 230.00 150.00
tblConstructionPhase PhaseEndDate 3/1/2028 11/10/2027
Table Name Column Name Default Value New Value
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Summer
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
ROG NOx CO SO2 Fugitive Bio- CO2
PM10
0.0000 3,192.295
1 3,192.295
1 0.6202 0.0000 3,207.800
4 Maximum 14.4337 13.3612 17.2299 0.0332 0.5262 0.5309 1.0571 0.1413 0.4994 0.6406
0.0000 3,192.295
1 3,192.295
1 0.6202 0.0000 3,207.800
4 2027 14.4337 13.3612 17.2299 0.0332 0.5262 0.5309 1.0571 0.1413 0.4994 0.6406 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 3,192.295
1 3,192.295
1 0.6202 0.0000 3,207.800
4 Maximum 14.4337 13.3612 17.2299 0.0332 0.5262 0.5309 1.0571 0.1413 0.4994 0.6406
0.0000 3,192.295
1 3,192.295
1 0.6202 0.0000 3,207.800
4 2027 14.4337 13.3612 17.2299 0.0332 0.5262 0.5309 1.0571 0.1413 0.4994 0.6406 CH4 N2O CO2e
Year lb/day lb/day
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2
Unmitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
2.0 Emissions Summary
2.1 Overall Construction (Maximum Daily Emission) Page 1954 of 4422 Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Summer
10.80 7.30 20.00 LD_Mix HDT_Mix HHDT
7.30 20.00 LD_Mix HDT_Mix HHDT
Architectural Coating 1 11.00 0.00 0.00
Building Construction 9 55.00 11.00 0.00 10.80
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle
Class
Hauling
Vehicle
Class
Trips and VMT
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Architectural Coating Air Compressors 1 6.00 78 0.48
Building Construction Welders 1 8.00 46 0.45
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Forklifts 3 8.00 89 0.20
Load Factor
Building Construction Cranes 1 7.00 231 0.29
Acres of Grading (Site Preparation Phase): 0
Acres of Grading (Grading Phase): 0
Acres of Paving: 0
Residential Indoor: 36,855; Residential Outdoor: 12,285; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area:
OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power 150
2 Architectural Coating Architectural Coating 10/16/2027 11/10/2027 5 18 End Date Num Days
Week
Num Days Phase Description
1 Building Construction Building Construction 3/22/2027 10/15/2027 5
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Summer
0.5262 3.3500e- 635.8208 635.8208 0.0193 636.3023
003
0.5296 0.1413 3.1200e003Total 0.1600 0.8916 1.1452 6.1900e- 0.1444 003
338.3236 338.3236 5.8600e0030.4518 2.4200e- 338.4700
003
0.4542 0.1198 2.2300e003Worker 0.1380 0.0653 0.9530 3.3900e- 0.1221 003
0.0744 9.3000e- 297.4972 297.4972 0.0134 297.8323
004
0.0754 0.0214 8.9000e004Vendor 0.0220 0.8263 0.1922 2.8000e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2
3.1 Mitigation Measures Construction
3.2 Building Construction - 2027
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Summer
0.5262 3.3500e- 635.8208 635.8208 0.0193 636.3023
003
0.5296 0.1413 3.1200e003Total 0.1600 0.8916 1.1452 6.1900e- 0.1444 003
338.3236 338.3236 5.8600e0030.4518 2.4200e- 338.4700
003
0.4542 0.1198 2.2300e003Worker 0.1380 0.0653 0.9530 3.3900e- 0.1221 003
0.0744 9.3000e- 297.4972 297.4972 0.0134 297.8323
004
0.0754 0.0214 8.9000e004Vendor 0.0220 0.8263 0.1922 2.8000e- 0.0223 003
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963
0.0000 2,556.474
4 2,556.474
4 0.6010 2,571.498
1 Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Summer
67.6647 67.6647 1.1700e0030.0904 4.8000e- 67.6940
004
0.0909 0.0240 4.5000e004Total 0.0276 0.0131 0.1906 6.8000e- 0.0244 004
67.6647 67.6647 1.1700e0030.0904 4.8000e- 67.6940
004
0.0909 0.0240 4.5000e004Worker 0.0276 0.0131 0.1906 6.8000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
3.3 Architectural Coating - 2027
Unmitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Summer
67.6647 67.6647 1.1700e0030.0904 4.8000e- 67.6940
004
0.0909 0.0240 4.5000e004Total 0.0276 0.0131 0.1906 6.8000e- 0.0244 004
67.6647 67.6647 1.1700e0030.0904 4.8000e- 67.6940
004
0.0909 0.0240 4.5000e004Worker 0.0276 0.0131 0.1906 6.8000e- 0.0244 004
Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Total 14.4061 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Off-Road 0.1709 1.1455 1.8091 2.9700e- 0.0515 0.0515 0.0515 0.0515 0.0000 281.4481 281.4481 0.0154 281.8319 003
Archit. Coating 14.2352 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2
Mitigated Construction On-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
Agenda Item #5.5.
Hunter Subdivision Project - Fifth Year - Napa County, Winter Off-road Equipment - Default equipment assumed.
Trips and VMT - Assumed same trips for construction of all res dwelling units.
Grading - Assumed site would be balanced.
1.3 User Entered Comments & Non-Default Data
Project Characteristics - Hunter Subdivision Project. BAAQMD.
Land Use - Construction of 9 SF residences and 2 ADUs. Updated population per City of St Helena avg household size per BayAreaCensus.
Construction Phase - Assumed project would begin construction Spring 2027 (March), with completion in November 2027.
Off-road Equipment - Default equipment assumed.
Off-road Equipment - Default equipment assumed.
CO2 Intensity
(lb/MWhr)
641.35 CH4 Intensity
(lb/MWhr)
0.029 N2O Intensity
(lb/MWhr)
0.006
64 Climate Zone 4 Operational Year 2028
Utility Company Pacific Gas & Electric Company
1.2 Other Project Characteristics
Urbanization Urban Wind Speed (m/s) 3.6 Precipitation Freq (Days) Single Family Housing 9.00 Dwelling Unit 2.92 16,200.00 22 Floor Surface Area Population
Apartments Low Rise 2.00 Dwelling Unit 0.13 2,000.00 5
1.0 Project Characteristics
1.1 Land Usage
Land Uses Size Metric Lot Acreage
CalEEMod Version: CalEEMod.2016.3.2
Date: 3/3/2021 10:42 AM
Hunter Subdivision Project - Fifth Year