Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
4 (1) Insurance Services Office Commercial General Liability coverage (Occurrence Form CG 00 01) or exact equivalent. (iii) Commercial General Liability Insurance must include coverage for the following:
(1) Bodily Injury and Property Damage
(2) Personal Injury/Advertising Injury
(3) Premises/Operations Liability
(4) Products/Completed Operations Liability
(5) Aggregate Limits that Apply per Project
(6) Explosion, Collapse and Underground (UCX) exclusion deleted
(7) Contractual Liability with respect to this Agreement (8) Property Damage
(9) Independent Contractors Coverage
(iv) The policy shall contain no endorsements or provisions limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits by one insured against another; (3) products/completed operations liability; or (4) contain any other exclusion contrary to the Agreement.
(v) The policy shall give City, its officials, officers, employees, agents and City designated volunteers additional insured status using ISO endorsement forms CG 20 10 10 01 and 20 37 10 01, or endorsements providing the exact same coverage. (vi) The general liability program may utilize either deductibles or provide coverage excess of a self-insured retention, subject to written approval by the City, and provided that such deductibles shall not apply to the City as an additional insured. b. Automobile Liability
(i) At all times during the performance of the work under this Agreement, the Consultant shall maintain Automobile Liability Insurance for bodily injury and property damage including coverage for owned, non-owned and hired vehicles, in a form and with insurance companies acceptable to the City.
(ii) Coverage for automobile liability insurance shall be at least as broad as Insurance Services Office Form Number CA 00 01 covering automobile liability (Coverage Symbol 1, any auto).
(iii) The policy shall give City, its officials, officers, employees, agents and City designated volunteers additional insured status. (iv) Subject to written approval by the City, the automobile liability program may utilize deductibles, provided that such deductibles shall not apply to the City as an additional insured, but not a self-insured retention.
c. Workers’ Compensation/Employer’s Liability
Agenda Item #10.7.

Page 171 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
5 (i) Consultant certifies that he/she is aware of the provisions of Section 3700 of the California Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and he/she will comply with such provisions before commencing work under this Agreement.
(ii) To the extent Consultant has employees at any time during the term of this Agreement, at all times during the performance of the work under this Agreement, the Consultant shall maintain full compensation insurance for all persons employed directly by him/her to carry out the work contemplated under this Agreement, all in accordance with the “Workers’ Compensation and Insurance Act,” Division IV of the Labor Code of the State of California and any acts amendatory thereof, and Employer’s Liability Coverage in amounts indicated herein. Consultant shall require all subconsultants to obtain and maintain, for the period required by this Agreement, workers’ compensation coverage of the same type and limits as specified in this section.
d. Professional Liability (Errors and Omissions)
At all times during the performance of the work under this Agreement the Consultant shall maintain professional liability or Errors and Omissions insurance appropriate to its profession, in a form and with insurance companies acceptable to the City and in an amount indicated herein.

This insurance shall be endorsed to include contractual liability applicable to this Agreement and shall be written on a policy form specifically designed to protect against acts, errors or omissions of the Consultant. “Covered Professional Services” as designated in the policy must specifically include work performed under this Agreement. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer's duty to defend. e. Minimum Policy Limits Required
(i) The following insurance limits are required for the Agreement:

Combined Single Limit
Commercial General Liability $1,000,000 per occurrence/ $2,000,000 aggregate for bodily injury, personal injury, and property
damage
Automobile Liability $1,000,000 combined single limit
Employer’s Liability $1,000,000 per accident or disease Professional Liability $1,000,000 per claim and aggregate (errors and omissions)
(ii) Defense costs shall be payable in addition to the limits. (iii) Requirements of specific coverage or limits contained in this section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance. Any available coverage shall be provided to the parties required to be named as Additional Insured pursuant to this Agreement.

Agenda Item #10.7.

Page 172 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
6 f. Evidence Required
Prior to execution of the Agreement, the Consultant shall file with the City evidence of insurance from an insurer or insurers certifying to the coverage of all insurance required herein. Such evidence shall include original copies of the ISO CG 00 01 (or insurer’s equivalent) signed by the insurer’s representative and Certificate of Insurance (Acord Form 25-S or equivalent), together with required endorsements. All evidence of insurance shall be signed by a properly authorized officer, agent, or qualified representative of the insurer and shall certify the names of the insured, any additional insureds, where appropriate, the type and amount of the insurance, the location and operations to which the insurance applies, and the expiration date of such insurance.
g. Policy Provisions Required
(i) Consultant shall provide the City at least thirty (30) days prior written notice of cancellation of any policy required by this Agreement, except that the Consultant shall provide at least ten (10) days prior written notice of cancellation of any such policy due to non-payment of premium. If any of the required coverage is cancelled or expires during the term of this Agreement, the Consultant shall deliver renewal certificate(s) including the General Liability Additional Insured Endorsement to the City at least ten (10) days prior to the effective date of cancellation or expiration.
(ii) The Commercial General Liability Policy and Automobile Policy shall each contain a provision stating that Consultant’s policy is primary insurance and that any insurance, self-insurance or other coverage maintained by the City or any named insureds shall not be called upon to contribute to any loss.
(iii) The retroactive date (if any) of each policy is to be no later than the effective date of this Agreement. Consultant shall maintain such coverage continuously for a period of at least three years after the completion of the work under this Agreement. Consultant shall purchase a one (1) year extended reporting period A) if the retroactive date is advanced past the effective date of this Agreement; B) if the policy is cancelled or not renewed; or C) if the policy is replaced by another claims-made policy with a retroactive date subsequent to the effective date of this Agreement.
(iv) All required insurance coverages, except for the professional liability coverage, shall contain or be endorsed to provide a waiver of subrogation in favor of the City, its officials, officers, employees, agents, and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subconsultants.
(v) The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability.

Further the limits set forth herein shall not be construed to relieve the Consultant from liability in excess of such coverage, nor shall it limit the Consultant’s indemnification obligations to the City and shall not preclude the City from taking such other actions available to the City under other provisions of the Agreement or law.
h. Qualifying Insurers
Agenda Item #10.7.

Page 173 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
7 (i) All policies required shall be issued by acceptable insurance companies, as determined by the City, which satisfy the following minimum requirements:
(1) Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A:VII and admitted to transact in the business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.
i. Additional Insurance Provisions
(i) The foregoing requirements as to the types and limits of insurance coverage to be maintained by Consultant, and any approval of said insurance by the City, is not intended to and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Consultant pursuant to this Agreement, including but not limited to, the provisions concerning indemnification.
(ii) If at any time during the life of the Agreement, any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement.
(iii) The City may require the Consultant to provide complete copies of all insurance policies in effect for the duration of the Project. (iv) Neither the City nor any of its officials, officers, employees, agents or volunteers shall be personally responsible for any liability arising under or by virtue of this Agreement.
j. Subconsultant Insurance Requirements. Consultant shall not allow any subcontractors or subconsultants to commence work on any subcontract until they have provided evidence satisfactory to the City that they have secured all insurance required under this section.

Policies of commercial general liability insurance provided by such subcontractors or subconsultants shall be endorsed to name the City as an additional insured using ISO form CG 20 38 04 13 or an endorsement providing the exact same coverage. If requested by Consultant, City may approve different scopes or minimum limits of insurance for particular subcontractors or subconsultants.

12. Indemnification.
a. To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing), indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant’s services, the Project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses. Consultant's obligation to indemnify Agenda Item #10.7.

Page 174 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
8 shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, or volunteers.
b. If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance of “design professional” services (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.

13. California Labor Code Requirements.
a. Consultant is aware of the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects (“Prevailing Wage Laws”). If the services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It shall be mandatory upon the Consultant and all subconsultants to comply with all California Labor Code provisions, which include but are not limited to prevailing wages (Labor Code Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5), certified payroll records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section 1777.1). The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4. b. If the services are being performed as part of an applicable “public works” or “maintenance” project, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Consultant and all subconsultants performing such services must be registered with the Department of Industrial Relations. Consultant shall maintain registration for the duration of the Project and require the same of any subconsultants, as applicable. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1. c. This Agreement may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements. Any stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor that affect Consultant’s performance of services, including any delay, shall be Consultant’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Consultant caused delay and shall not be compensable by the City. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor.

Agenda Item #10.7.

Page 175 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
9 14. Safety.

Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and life-saving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

15. Verification of Employment Eligibility.

By executing this Agreement, Consultant verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subconsultants and sub-subconsultants to comply with the same.

16. INTENTIONALLY DELETED

17. Laws and Venue.

This Agreement shall be interpreted in accordance with the laws of the State of California.

If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a the Superior Court of California for the County of Napa.

18. Termination or Abandonment
a. City has the right to terminate or abandon any portion or all of the work under this Agreement by giving ten (10) calendar days written notice to Consultant. In such event, City shall be immediately given title and possession to all original field notes, drawings and specifications, written reports and other documents produced or developed for that portion of the work completed and/or being abandoned. City shall pay Consultant the reasonable value of services rendered for any portion of the work completed prior to termination. If said termination occurs prior to completion of any task for the Project for which a payment request has not been received, the charge for services performed during such task shall be the reasonable value of such services, based on an amount mutually agreed to by City and Consultant of the portion of such task completed but not paid prior to said termination. City shall not be liable for any costs other than the charges or portions thereof which are specified herein. Consultant shall not be entitled to payment for unperformed services, and shall not be entitled to damages or compensation for termination of work.
b. Consultant may terminate its obligation to provide further services under this Agreement upon thirty (30) calendar days’ written notice to City only in the event of substantial failure by City to perform in accordance with the terms of this Agreement through no fault of Consultant.

Agenda Item #10.7.

Page 176 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
10 19. Ownership of Documents and Confidential Information. a. All deliverables and other documents generated by Consultant in the performance of the Services, including all work papers, work-in-progress, designs, drawings, documents, data, computations, specifications, studies and reports prepared by Consultant as a part of the Services or authorized Additional Services (“Consultant Work Product”) shall belong to and be subject to the sole ownership and use of City. b. Except as otherwise provided in “Termination or Abandonment,” above, all original field notes, written reports, drawings and specifications and other documents, produced or developed for the Project shall, upon payment in full for the services described in this Agreement, be furnished to and become the property of the City. c. During the course of the performance of this Agreement, Consultant may receive written or verbal information from City, its representatives or agents, not in the public domain. Such information may include City’s know how, trade secrets, and other proprietary and confidential information and Consultant agrees to treat such information as confidential information belonging to City. Consultant agrees that neither it, nor its officers, employees, representatives, agents, successors, or assigns, will disclose such information to any third party or use the same in any manner without the prior written consent of City. Moreover, Consultant agrees to safeguard such proprietary and confidential information from unauthorized disclosure and/or use using the same degree of care it uses to protect its own proprietary and confidential information, but not less than a reasonable standard of care. In the event that disclosure of such information is sought pursuant to any law or regulation, Consultant shall promptly notify City of such fact to allow City to assert whatever exclusions or exemptions may be available to it under applicable law or regulation.

20. Organization
Consultant shall assign Cody Anderson as Project Manager. The Project Manager shall not be removed from the Project or reassigned without the prior written consent of the City.

21. Limitation of Agreement.

This Agreement is limited to and includes only the work included in the Project described above.

22. Notice
Any notice or instrument required to be given or delivered by this Agreement may be given or delivered by depositing the same in any United States Post Office, certified mail, return receipt requested, postage prepaid, addressed to:

CITY:

City of St. Helena
1088 College Avenue, St. Helena, CA 94574
Attn: Joseph Leach, Public Works Director
CONSULTANT:

Sherwood Design Engineers, Ltd.

PO Box 849598
Los Angeles, CA 90087-9598
and shall be effective upon receipt thereof.

Agenda Item #10.7.

Page 177 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
11 23. Third Party Rights
Nothing in this Agreement shall be construed to give any rights or benefits to anyone other than the City and the Consultant.

24. Equal Opportunity Employment.

Consultant represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

25. Entire Agreement
This Agreement, with its exhibits, represents the entire understanding of City and Consultant as to those matters contained herein, and supersedes and cancels any prior or contemporaneous oral or written understanding, promises or representations with respect to those matters covered hereunder. Each Party acknowledges that no representations, inducements, promises or agreements have been made by any person which are not incorporated herein, and that any other agreements shall be void. This Agreement may not be modified or altered except in writing signed by both Parties hereto. This is an integrated Agreement.

26. Severability
The unenforceability, invalidity or illegality of any provision(s) of this Agreement shall not render the remaining provisions unenforceable, invalid or illegal.

27. Successors and Assigns
This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators and assigns of each Party to this Agreement. However, Consultant shall not assign or transfer by operation of law or otherwise any or all of its rights, burdens, duties or obligations without the prior written consent of City. Any attempted assignment without such consent shall be invalid and void.

28. Non-Waiver
None of the provisions of this Agreement shall be considered waived by either Party, unless such waiver is specifically specified in writing.

29. Time of Essence
Time is of the essence for each and every provision of this Agreement.

30. City’s Right to Employ Other Consultants
City reserves its right to employ other consultants, including engineers, in connection with this Project or other projects.

Agenda Item #10.7.

Page 178 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
12 31. Prohibited Interests
Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.
[SIGNATURES ON FOLLOWING PAGE]
Agenda Item #10.7.

Page 179 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
13 SIGNATURE PAGE FOR PROFESSIONAL SERVICES AGREEMENT
BETWEEN CITY OF ST. HELENA
AND SHERWOOD DESIGN ENGINEERS LTD.

IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first written above.

CITY OF ST. HELENA Sherwood Design Engineers, Ltd.

By: By:

Anil Comelo Its:

City Manager
Printed Name:

ATTEST:

By:

Ethan Walsh, City Attorney

Agenda Item #10.7.

Page 180 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
14 EXHIBIT A
Scope of Services
Agenda Item #10.7.

Page 181 of 383 ends

Hwy 29 & Mills Lane Improvements
St. Helena, CA
Scope and Fee Proposal
for
Civil Engineering Services
Permitting Documents
Sherwood Design Engineers
September 8, 2025
Agenda Item #10.7.

Page 182 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 2 / 13 Scope and Fee Proposal
September 8, 2025
City of St. Helena
Attn: Mario Traverso
City of St. Helena | Public Works
1088 College Avenue | St. Helena, CA 94574
(707) 204-9084 | [email protected]
RE: Scope and Fee Proposal for Civil Engineering Services Mills Lane & Hwy 29 Improvements
Permit and Construction Documents
Mr. Traverso,
In response to your request, Sherwood Design Engineers (“Sherwood” hereinafter) is pleased to submit this proposal to the City of St. Helena (the “Client” hereinafter) for engineering services for improvements to Mills Lane and Hwy 29 in the City of St. Helena, CA. This proposal describes professional civil engineering services to be performed by Sherwood in collaboration, as appropriate, with the Client’s other design team members and their consultants (the “Design Team” hereinafter).

We will initiate proposed services upon the approval of this proposal.

1.0 PROJECT UNDERSTANDING
This phase of work includes public right of way improvements previously associated with the Farmstead Lodging project, which has been on indefinite hold. As requested by the City, Sherwood will update our design documents and resume the permitting process in collaboration with the City. • Design, permitting, and construction of Mills Lane realignment (does not include relocation of PG&E power lines)
• Design, permitting, and construction of revised Hwy 29 intersection Sherwood Design Engineers will work collaboratively with the City and other governing agencies to complete the contracted civil engineering services in accordance with appropriate requirements of the governing agencies. The understood scope of work has been established by the City and consists of civil engineering services for the required improvements.

This proposal is valid for 60 days from date submitted to [Insert Full Client Name]. Any proposed project or portion thereof not accepted during this timeframe, will become void and will require a new proposal if requested in the future.

Sherwood will initiate proposed services upon the written approval of these terms and conditions or upon receipt of a written Notice to Proceed that identifies that a formal signed contract will be forthcoming from the client.

2.0 PROJECT UNDERSTANDING
The project includes public right of way improvements previously associated with the Farmstead Lodging project, which has been on indefinite hold. As requested by the City, Sherwood will update our design documents and support the City of St. Helena in resuming the permitting process for public improvements to Mills Lane and an improved intersection at Hwy 29 and Grayson Ave.

Agenda Item #10.7.

Page 183 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 3 / 13 Sherwood will work closely in a collaborative manner with the Design Team to complete the contracted civil engineering services in accordance with appropriate requirements of the governing agencies. The understood scope of work has been established by the City of St. Helena and consists of civil engineering services as described below.

Every project is subject to specific requirements and conditions that cannot be fully anticipated and may require additional documentation and support not covered in the original scope. If additional scope items are identified, outside those listed within this proposal Sherwood will work with the Client to develop an Additional Services agreement for approval prior to advancing the work.

2.1 Limits of Work
The Limits of Work for this project encompasses the area(s) bounded in Exhibit A. Any additional work not included herein may be scoped in a separate contract.

3.0 PROJECT PHASING AND DELIVERABLES
Sherwood proposes the following design phases relative to the anticipated permit approvals process, planning documents, and construction documents production. Each phase is intended to enhance the design upon successive approvals to help the project realize the intended design upon completion.

The proposed design phases for this project are:

1. Intersection Improvements
a. Permit Documents
b. Permitting Support
c. Construction Documents
d. Construction Administration

2. Mills Lane Realignment
a. Permit Documents
b. Construction Documents
c. Construction Administration

3. Stormwater Pollution Prevention Plan (SWPPP)
It is understood that Sherwood will provide electronic files to the Client for submittal to the appropriate stakeholders and design review committee. Refer to phase(s) below for specific deliverables.

3.1 Intersection Improvements
Upon authorization, Sherwood will restart the design and permitting effort of the improved intersection of Hwy 29, Grayson Ave, and Mills Lane. Improvements will be consistent with the Hwy 29 Specific Plan and Development Agreement for the project with the assumptions listed in Section 5.0 in this agreement.

Intersection plans will include a new at-grade crossing of the existing train tracks and relocation of railroad equipment as directed by the railroad operator. The plans prepared in this phase will be used for coordination with the Town and Caltrans, permitting, cost estimation, and construction. There will be two (2) milestones during this phase of the project: 50%, 90% and 100% CD. This scope includes the following services and deliverables:

1. General Initiation/Coordination/Meeting(s)

2. Site Visit(s)

3. Demolition Plan

4. Grading & Drainage Plan

5. Striping Plan

6. Temporary Traffic Control Plan
Agenda Item #10.7.

Page 184 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 4 / 13

7. Signal Plan including: detector loops, hand holes, detector lead in cable, pull boxes, conduit and conductors, and traffic signal improvements.

8. Utility Plan (showing existing to remain, new recycled water line, and revised drainage)

9. Stormwater Control Plan

10. Detail Sheets

11. Specifications (Caltrans Standard Specifications)
Deliverables include:

1. Attend two (2) Design Team coordination meeting(s) (local).

2. One (1) Site Visit.

3. Four (4) Agency Coordination meetings.

4. One (1) Submittal to Client of the 90% Civil Engineering Construction Document package for Permit submittal.

5. One (1) Submittal to Client of 100% Civil Engineering Construction Document package stamped and signed for Permit re-submittal, addressing plan check comments.

6. Issue (1) Submittal of the Stormwater Control Plan

3.2 Mills Lane Realignment
Upon authorization, Sherwood will prepare permit and construction documents for the realignment of Mills Lane. Improvements will be consistent with the approved Farmstead Development Agreement and will include the new alignment from Hwy 29 to the nearest tie in point along the existing section of Mills that does not required relocation of existing utility poles. Plans will also include a new driveway connection to the Gold property to the north of Mills Lane. Sherwood anticipates that the plans delivered in this phase will be used for City and agency reviews, cost estimations, obtaining the building permit, bidding and for the purpose of construction. There will be two (2) milestones during this phase of the project: 90% and 100% CD. This scope includes the following services and deliverables:

1. General Initiation/Coordination/Meeting(s)

2. Site Visit(s)

3. Erosion Control Plan

4. Demolition Plan

5. Grading Plan with Road Profiles

6. Drainage Plan

7. Utility Plan

8. Stormwater Control Plan

9. Detail Sheets

10. Specifications
Deliverables include:

1. Attend two (2) Design Team coordination meeting(s) (local).

2. One (1) Site Visit.

3. Four (4) Agency Coordination meetings.

4. One (1) Submittal to Client of the 90% Civil Engineering Construction Document package for Permit submittal.

5. One (1) Submittal to Client of 100% Civil Engineering Construction Document package stamped and signed for Permit re-submittal, addressing plan check comments.

6. Issue (1) Submittal of the Stormwater Control Plan

3.3 Management & Coordination
Upon authorization, Sherwood will assist the Owner with overall project management and coordination.

Management assistance will be provided on a time & materials as-requested basis in order to best supporting an efficient process of coordinated design with the Town of St Helena. This phase is intended to allow for additional management work not included in the design phases above. Anticipated efforts include but are not limited to:

1. Preparation and maintenance of project schedule

2. Meetings with City and their consultants beyond what is included in design phases Agenda Item #10.7.

Page 185 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 5 / 13

3. Management of permitting process with City

4. Assist Owner with engagement of contractor, surveyor, or others

5. Assist Owner with preparation of completed permit applications to City, Caltrans, and CA PUC.

3.4 Construction Administration
Upon agreement with the Client, Sherwood will perform typical Construction Administration (CA) services during this phase of the project related to designs based on information available during final Construction Document submittal. The actual effort required by Sherwood during Construction Administration is highly dependent on field conditions encountered, contractor scheduling/sequencing, and contractor means and methods. Assumed fees for this phase are based on typical conditions and processes and may vary based on conditions outside of Sherwood’s control. Anticipated scope of services to provide general support to the Client during the construction schedule include:

1. Attend one (1) on site pre-construction conference / kick-off meeting.

2. Attend site visits during construction for observation of available work in terms of general conformance to construction documents.

3. Civil CA efforts in this phase include the following standard civil engineering services:
a. Review of civil related Submittals and Shop Drawings. b. RFI Response / Design Clarifications.
c. Attend final punch list site visit

4.0 ADDITIONAL PROJECT SCOPE & SERVICES (NOT INCLUDED IN PROPOSED FEE) The following are some services that are not included in this proposal. Sherwood would be pleased to provide these and other additional services that may become necessary as the project proceeds.

Additional services will be provided for additional mutually satisfactory compensation.

1. Separate project specifications (CSI format) not included in Section 2.0.

2. Preparation of traffic studies or other unanticipated deliverables associated with Caltrans permitting

3. Agency Submittals due to unanticipated permit staging of full permits.

4. More than one (1) Agency plan check comments and requested plan set resubmittal (not including previously addresses issues).

5. Major utility repair or realignment.

6. Construction routing and Traffic Control Plan.

7. Operation and Maintenance Plans.

8. Revisions to/or subsequent iterations of plans due to changes in agency requirements, design review or client.

9. Review/Respond to any issues related to unforeseen complications not known during initiation of agreement; including but not limited to utility and other subsurface conflicts and circulation changes.

10. Contractor and client initiated design revisions.

11. Additional Meeting(s).

12. Construction Staging Plan.

13. Clarifying Studies

14. Exhibits or other unanticipated agency requirements.

5.0 ASSUMPTIONS
The following items, if applicable, are to be provided by the Client prior to commencement of work:

1. Design will be based upon the Client’s approved site plan layout and provided to Sherwood in AutoCAD.

2. Design level Site Survey and all available line work of existing conditions in AutoCAD format.

3. Available site utility information, record documents, existing engineering and utility analysis.

4. Building finish floor elevations.

5. Historical project information.

Agenda Item #10.7.

Page 186 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 6 / 13

6. Environmental Assessments Reports.

7. Geotechnical Engineering Report.

8. Arborist Reports.

Additional Assumptions:

1. Phase durations will generally correspond to those shown in section 5.0. Extensions to the project schedule and associated engineering efforts will be addressed by contract addendum.

2. Should value engineering or incorporation of addenda and other modifications be required after completion of the 100% CDs/ Bid Documents/Permit Set, Sherwood Design Engineers will complete necessary changes (on a Time and Material (T&M) Basis, with a stipulated cap), agreed upon by the Client, prior to commencing our work.

3. This scope/fee is based on the discussion with the City of St. Helena in June 2025 in which the desire to complete Mills Lane and Hwy 29 improvements was discussed. Changes to the scope or schedule as described may result in additional civil engineering efforts that will be addressed by contract addendum.

4. The City of St. Helena will provide a stormwater management connection location within the project footprint. Sherwood has identified that a permanent conveyance of stormwater does not currently exist within this stretch of Mills Lane. Sherwood will not be responsible for designing or permitting a new storm drain outfall as part of this project.

5. If necessary, an updated signed and stamped survey of the project site will be provided by the client prior to the commencement of the design phase.

6. Sherwood is not responsible for any inconsistencies with the survey identified in the field that affect civil engineering and/or landscape design drawings. Sherwood would be prepared to modify design drawings to remedy unforeseen site conditions based upon an agreed upon additional scope and fee.

7. Structural design, including site elements associated with earthwork retention and sign/lighting footing design, is not included in this scope of work unless specifically identified in Section 2.0.

8. Unless specifically identified in the RFP, it is assumed that Sherwood and the Design Team will deliver plans and supporting documents consistent with Sherwood Design Engineers standard styles in keeping with accepted standards of care. Changes to presentation formats, including additional plan sheets, use of specific fonts, note and keynotes usage, CAD layers, sheets size, or other styles introduced during the design process and resulting in additional unanticipated efforts will be addressed by contract addendum.

9. If this contract were to be placed on hold for more than thirty days, Sherwood reserves the right to redistribute staff to other projects and would require a two-week remobilization effort and a renegotiation of our terms of service to restart the effort.

10. The client may not copy, republish or use any imagery provided by Sherwood as part of any submissions as this imagery may be subject to copyright infringement. Sherwood relinquishes all responsibility for use of any copy-righted image that is furnished to the client as part of any submission.

6.0 BASIC AND ADDITIONAL FEES FOR SERVICES
Fixed Fee: Fees below will be billed on a fixed fee basis in accordance with Attachment I. Fee estimates are based on the schedule below and are subject to revision based on changes to this schedule. Additional services can be provided upon written request and will be billed on a Time and Materials basis or by contract addendum.

A. BASIC SERVICES Schedule Fee Estimate
Estimated
Reimbursable
Expenses

2.0 Project Scope and Fees
Agenda Item #10.7.

Page 187 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 7 / 13 A. BASIC SERVICES Schedule Fee Estimate
Estimated
Reimbursable
Expenses
Mills Lane Improvements 16 weeks $45,000
Hwy 29 Intersection Improvements 16 weeks $35,000
Project Management & Coordination 16 weeks $10,000
Total Fee Estimate $90,000 $1,000
*Duration is defined as elapsed time from initiation of phase or scope of work upon our receipt of your written authorization to proceed.

7.0 EXCLUSIONS
Sherwood shall not be required to provide the following services:

1. Agency Fees

2. Geotechnical Report

3. Legal Descriptions

4. Foundation/ Structural Design

5. Construction Staking Site Cleanup

6. Mitigation of contaminants resulting from
unidentified leaking above ground or
underground storage tanks

7. Soils testing, remediation, removal, or
cathodic protection design

8. Percolation tests

9. MEP Design Service

10. Hazardous Waste Remediation

11. Materials Testing and Inspection reports.

12. O&M plans for Mechanical systems

13. Building Waterproofing – other than items
in scope

14. Utility demand engineering for electrical
service, gas services, telecommunication
service, streetlights and sidewalk lights

15. Connection location for buildings by
others; electric meter and gas meter
layout by MEP consultant

16. Traffic Engineering and Traffic Studies

17. Verification or inspection of construction
activities in the field.

18. Flow/pressure or hydrant flow test

8.0 REIMBURSABLE EXPENSES
Reimbursable costs as defined in the schedule will be billed in accordance with Sherwood Design Engineers' Fee Schedule – see Attachment II. Ordinary expenses of approximately 10 percent of the labor budget should be anticipated.

9.0 INITIATION
For your reference, copies of our current fee schedule and our Standard Terms and Conditions have been included with this proposal and will be part of this agreement. Should you find the terms of this proposal acceptable, please sign and return via email to Cody Anderson at [email protected].

Sherwood Design Engineers thanks you for this opportunity to submit this proposal and look forward to beginning work with you on this exciting project!
Sincerely,
Cody Anderson, PE
Managing Principal
Agenda Item #10.7.

Page 188 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 8 / 13 EXHIBIT A – LIMIT OF WORK
Agenda Item #10.7.

Page 189 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 12 / 13

ATTACHMENT II

PROFESSIONAL PERSONNEL SERVICE FEES
JANUARY 1, 2025 – DECEMBER 31, 2025
Personnel Rate
Associate Principal $ 260
Senior Engineer $ 250
Senior Project Manager $ 250
Director of Technology $ 240
Project Manager $ 240
Senior Project Engineer / Strategist $ 240
Project Engineer / Strategist $ 220
Design Engineer III $ 205
Designer III $ 200
CAD Manager $ 195
Design Engineer II / Designer II $ 195
Senior CAD Technician $ 195
Design Engineer I / Designer I $ 185
CAD Technician $ 165
Graphic Designer $ 165
Project Assistant $ 145
Principals’, Managing Principals’ and Design Principals’ time on projects is chargeable at $ 285 to $ 350 per hour.

Charges for outside services, equipment, and facilities not furnished directly by Sherwood Design Engineers will be billed at cost plus 10%. Such charges may include, but shall not be limited to, printing reproduction services; shipping, delivery, and courier charges; sub-consultant fees and expenses; special fees, permits and insurance; transportation on public carriers, and consumable materials. Mileage will be charged at the prevailing IRS rate per mile.

These rates apply to the current period and are subject to increase by SDE each January 1 and July 1 or when foreign exchange rates cause the hourly rates to decrease in relation to the USD by more than 5% from the rate at the date of this Proposal.

Agenda Item #10.7.

Page 190 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 13 / 13

ACKNOWLEDGEMENT
The respective obligations of the parties are set forth in the Proposal, including any schedules or exhibits referred to therein, and in the ATTACHMENT I - STANDARD TERMS AND CONDITIONS which is attached to the Proposal and made a part thereof. If both the Client and Owner have signed this Acknowledgement, both shall be responsible jointly and severally to pay amounts invoiced and due to Sherwood Design Engineers.

Proposal:

Letter dated for the
Billing: Preferred Billing Method: ☐ US Mail ☐ Email ☐ Both Billing contact name:

Billing contact email:

Special Instructions:

Client Owner
Full Legal Name: Full Legal Name:

Attention: Attention:

Address: Address:

Federal Tax ID: Federal Tax ID:
x x
Agreed For Client Title Date Agreed For Owner Title Date Sherwood Design Engineers:

This agreement is with only the following identified entity which is solely responsible to provide the Service:

Sherwood Design Engineers, Ltd - 2548 Mission Street, San Francisco, CA 94110, USA x
Agreed For Sherwood Design Engineers Title Date
Remittance Address: Sherwood Design Engineers, P.O. Box 849598, Los Angeles, CA 90084-9598 Agenda Item #10.7.

Page 191 of 383 ends
Page 192 of 383 ends

Agenda Report to the City Council
Agenda Section: CONSENT ITEMS
Department: Public Works
DATE: November 25, 2025
FROM: Stephanie Killingsworth, Public Works Financial Analyst SUBJECT: Consideration and Proposed Approval of a Resolution Authorizing the City Manager to Execute a Professional
Services Agreement with Sherwood Design Engineers for
Civil Engineering Services for the Mills Lane and Highway 29 Improvements Project in an amount not-to-exceed
$91,000 and Establishing Capital Improvement Plan
Project No. R26-06 - Mills Lane Realignment and
Intersection Improvements.

RECOMMENDED
ACTION:

Staff recommends approval of the attached Resolution.

PREVIOUS COUNCIL
ACTION:

None.

STATEMENT OF THE
PURPOSE:

To authorize design services related to the Mills Lane
Realignment and Intersection Improvements.

FINANCIAL IMPACT: The total financial impact is an amount not-to-exceed $91,000, to be funded from Traffic Mitigation Impact Fees (Fund 740).

BACKGROUND:

The proposed project advances long-planned right-of-way improvements at the intersection of Mills Lane, Grayson Avenue, and Highway 29.

These improvements were originally part of the Farmstead Lodging Project's conditions of approval and have been on hold since the private project's deferral. To address existing traffic safety and access deficiencies, the City now intends to move forward with design and permitting for these public improvements independent of the private development.

It should be noted that the Farmstead development will still be obligated to compensate the City for their proportionate share of the project costs as delineated in the Development Agreement.

Sherwood Design Engineers was previously the engineer for the record for these plans and possesses the relevant background materials and agency coordination experience.

Re-engaging Sherwood Design Engineers will allow the City to efficiently update existing design documents and resume permitting with Caltrans, the California Public Utilities Commission, and other stakeholders without re-starting the process.

Agenda Item #10.7.

Page 193 of 383 ends

DISCUSSION:

Sherwood's proposal outlines engineering services for:
 Intersection Improvements - Permit documents, permitting support, and construction documents for the revised intersection at Highway 29 and Grayson Avenue, including railroad crossing coordination.
 Mills Lane Realignment - Design and permitting for the realignment connecting to Highway 29 consistent with the previous Farmstead Development Agreement.  Stormwater Control and Storm Water Pollution Prevention Plan Preparation.  Project Management and Construction Administration support on a time-andmaterials basis during construction.

Staff has reviewed the proposal and determined that the scope of services is consistent with the City's project needs and industry standards. The proposed fee is reasonable for the scope and timeline of work.

Approval of this agreement will enable design work to commence immediately, allowing staff to proceed with Caltrans and the California Public Utilities Commission permitting.

Following completion of design and permitting, staff will return to Council for authorization to bid construction.

ENVIRONMENTAL REVIEW: Not a CEQA Project.

GOAL:

Goal 2: Improve Infrastructure & Further Environmental Sustainability Goal 5: Enhance Quality of Life
Goal 8: Implement Capital Improvement Plans (CIP) Projects Miscellaneous/Other DOCUMENTS ATTACHMENTS:

Resolution Mills Lane
R26-06 CIP Page
PSA Sherwood Design Engineers
Agenda Item #10.7.

Page 194 of 383 ends

CITY OF ST. HELENA
RESOLUTION NO. 2025-__
RESOLUTION AUTHORIZING (1) THE CITY MANAGER TO

EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH

SHERWOOD DESIGN ENGINEERS FOR CIVIL ENGINEERING
SERVICES FOR THE MILLS LANE AND HIGHWAY 29

IMPROVEMENTS PROJECT IN AN AMOUNT NOT-TO-EXCEED
$91,000, AND (2) ESTABLISHING CAPITAL IMPROVEMENT
PROJECT R26-06 – MILLS LANE REALIGNMENT AND
INTERSECTION IMPROVEMENTS.

RECITALS
A. The City of St. Helena seeks to advance long-planned public right-of-way improvements to improve traffic safety, access, and connectivity; and B. These improvements were originally conditioned under the Farmstead Lodging Project, which has been on hold, and the City now desires to proceed independently with these public improvements; and
C. Sherwood Design Engineers previously served as the engineer of record for the project and has the background materials and permitting experience necessary to efficiently resume and complete the work; and
D. Sherwood’s proposal includes design, permitting, and construction-support services for intersection improvements, roadway realignment, and stormwater compliance planning, for a total not-to-exceed $91,000; and E. Funding for this work is available from Traffic Mitigation Impact Fees (Fund 740), and it is appropriate to establish a new Capital Improvement Project R26-06 Mills Lane Realignment and Intersection Improvements to manage this effort.

RESOLUTION
NOW, THEREFORE, the City Council of the City of St. Helena resolves as follows:

1. Authorizes the City Manager to execute a Professional Services Agreement with Sherwood Design Engineers for civil engineering services for the Mills Lane and Highway 29 Improvements Project in an amount not-to-exceed $91,000.

Agenda Item #10.7.

Page 195 of 383 ends

2. Authorizes an establishment of a new Capital Improvement Project, R26-06 Mills Lane Realignment and Intersection Improvements funded from Traffic Mitigation Impact Fees (Fund 740).

3. Budget Amendments are as follows:

Description Fund GL Account Amount
Budget Increase
Transfer to Other Funds
740 – Traffic
Mitigation Impact
Fees
740-40-00-29-99 $91,000
Budget Increase
Operating Transfers In
741 – Streets
Capital
Improvement
741-39-98-00-00 $91,000

4. Funding is as follows:

Description Fund/Funding
Source
Expense
GL Account
Amount
R26-06
Design
740 – Traffic
Mitigation Impact
Fees
741-5014-3110 $91,000
Approved at a Regular Meeting of the St. Helena City Council on November 25, 2025, by the following vote:

Mayor Dohring:

Vice Mayor Deasy:

Council Member Barak:

Council Member Spadarotto:

Council Member Summers:

APPROVED: ATTEST:
________________________ ________________________
Paul Jamison Dohring, Mayor Andrew Bradley, City Clerk
Agenda Item #10.7.

Page 196 of 383 ends

Mills Lane Realignment and Intersection Improvements
Category
Project Mills Lane
Streets
Project No: R26-06
Public Works
Location:

Responsible
Department:
2025-26 2026-27 2027-28 2029-30

PROJECT
TOTAL

EXPENDITURES
(Thousands of Dollars)
2028-29
Continued
Approp.

Exp/Enc as
of
2/28/2025
3110 - Design 91,000 91,000
EXPENDITURE TOTALS 91,000 91,000
FUNDING SOURCES
740-Traffic Mitigation Impact Fees 91,000 91,000
FUNDING TOTALS 91,000 91,000
EXPENDITURE ACCOUNTS:   741-5014-
STATUS:   Design PSA
PRIORITY:   Medium
PROJECT PURPOSE & DESCRIPTION:

To design and permit long-planned roadway improvements that will realign Mills Lane and improve the intersection. The project enhances traffic safety, access, and connectivity along this key corridor, addressing long-standing deficiencies in circulation and sight distance near the Highway 29 corridor and adjacent development area.

PROJECT NOTES:

FY26 -New CIP Project created with Resolution at November 25, 2025 City Council Meeting. -Future construction funding to be determined following completion of design and permitting. 34 Agenda Item #10.7.

Page 197 of 383 ends
Page 198 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
1 CITY OF ST. HELENA

PROFESSIONAL SERVICES AGREEMENT
MILLS LANE AND HIGHWAY 29 INTERSECTION IMPROVEMENTS
This Agreement is made and entered into as of November 25, 2025 by and between the City of St. Helena, a public agency organized and operating under the laws of the State of California (“City”), and Sherwood Design Engineers, Ltd., a Corporation with its principal place of business at 2548 Mission Street, San Francisco, CA 94110 (hereinafter referred to as “Consultant”). City and Consultant are sometimes individually referred to as “Party” and collectively as “Parties” in this Agreement.

RECITALS
A. City is a public agency of the State of California and is in need of professional services for the following project:

Mills Lane and Highway 29 Intersection Improvements (hereinafter referred to as “the Project”).

B. Consultant is duly licensed and has the necessary qualifications to provide such services.

C. The Parties desire by this Agreement to establish the terms for City to retain Consultant to provide the services described herein.

AGREEMENT
NOW, THEREFORE, IT IS AGREED AS FOLLOWS:

1. Services.

Consultant shall provide the City with the services described in the Scope of Services attached hereto as Exhibit “A.”

2. Compensation.
a. Subject to paragraph 2(b) below, the City shall pay for such services in accordance with the Schedule of Charges set forth in Exhibit “A.” b. In no event shall the total amount paid for services rendered by Consultant under this Agreement exceed the sum of $91,000.00. This amount is to cover all printing and related costs, and the City will not pay any additional fees for printing expenses. Periodic payments shall be made within 30 days of receipt of an invoice which includes a detailed description of the work performed. Payments to Consultant for work performed will be made on a monthly billing basis.

3. Additional Work.

If changes in the work seem merited by Consultant or the City, and informal consultations with the other party indicate that a change is warranted, it shall be processed in the following manner: a letter outlining the changes shall be forwarded to the City by Consultant with a Agenda Item #10.7.

Page 199 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
2 statement of estimated changes in fee or time schedule. An amendment to this Agreement shall be prepared by the City and executed by both Parties before performance of such services, or the City will not be required to pay for the changes in the scope of work. Such amendment shall not render ineffective or invalidate unaffected portions of this Agreement.

4. Maintenance of Records.

Books, documents, papers, accounting records, and other evidence pertaining to costs incurred shall be maintained by Consultant and made available at all reasonable times during the contract period and for four (4) years from the date of final payment under the contract for inspection by City.

5. Term.

The term of this Agreement shall be from November 18, 2025 to November 18, 2026 unless earlier terminated as provided herein. The Parties may, by mutual, written consent, extend the term of this Agreement if necessary to complete the Project. Consultant shall perform its services in a prompt and timely manner within the term of this Agreement and shall commence performance upon receipt of written notice from the City to proceed (“Notice to Proceed”). The Notice to Proceed shall set forth the date of commencement of work.

6. Delays in Performance.
a. Neither City nor Consultant shall be considered in default of this Agreement for delays in performance caused by circumstances beyond the reasonable control of the nonperforming party. For purposes of this Agreement, such circumstances include but are not limited to, abnormal weather conditions; floods; earthquakes; fire; epidemics; pandemics; war; riots and other civil disturbances; strikes, lockouts, work slowdowns, and other labor disturbances; sabotage or judicial restraint.
b. Should such circumstances occur, the non-performing party shall, within a reasonable time of being prevented from performing, give written notice to the other party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement.

7. Compliance with Law.
a. Consultant shall comply with all applicable laws, ordinances, codes and regulations of the federal, state and local government, including Cal/OSHA requirements. b. If required, Consultant shall assist the City, as requested, in obtaining and maintaining all permits required of Consultant by federal, state and local regulatory agencies. c. If applicable, Consultant is responsible for all costs of clean up and/ or removal of hazardous and toxic substances spilled as a result of his or her services or operations performed under this Agreement.

8. Standard of Care; Performance of Employees
Agenda Item #10.7.

Page 200 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
3 a. Consultant’s services will be performed in accordance with generally accepted professional practices and principles and in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions. b. Consultant’s employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them. Consultant represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Consultant shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Consultant’s failure to comply with the standard of care provided for herein. Any employee of the Consultant or its sub-consultants who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Consultant and shall not be re-employed to perform any of the Services or to work on the Project.

9. Assignment and Subcontracting
Consultant shall not assign, sublet, or transfer this Agreement or any rights under or interest in this Agreement without the written consent of the City, which may be withheld for any reason. Any attempt to so assign or so transfer without such consent shall be void and without legal effect and shall constitute grounds for termination. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement. Nothing contained herein shall prevent Consultant from employing independent associates and subcontractors as Consultant may deem appropriate to assist in the performance of services hereunder.

10. Independent Contractor
Consultant is retained as an independent contractor and is not an employee of City. No employee or agent of Consultant shall become an employee of City. The work to be performed shall be in accordance with the work described in this Agreement, subject to such directions and amendments from City as herein provided.

11. Insurance. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City it has secured all insurance required under this section. In addition, Consultant shall not allow any subcontractor to commence work on any subcontract until it has secured all insurance required under this section. a. Commercial General Liability
(i) The Consultant shall take out and maintain, during the performance of all work under this Agreement, in amounts not less than specified herein, Commercial General Liability Insurance, in a form and with insurance companies acceptable to the City. (ii) Coverage for Commercial General Liability insurance shall be at least as broad as the following:

Agenda Item #10.7.

Page 201 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
4 (1) Insurance Services Office Commercial General Liability coverage (Occurrence Form CG 00 01) or exact equivalent. (iii) Commercial General Liability Insurance must include coverage for the following:
(1) Bodily Injury and Property Damage
(2) Personal Injury/Advertising Injury
(3) Premises/Operations Liability
(4) Products/Completed Operations Liability
(5) Aggregate Limits that Apply per Project
(6) Explosion, Collapse and Underground (UCX) exclusion deleted
(7) Contractual Liability with respect to this Agreement (8) Property Damage
(9) Independent Contractors Coverage
(iv) The policy shall contain no endorsements or provisions limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits by one insured against another; (3) products/completed operations liability; or (4) contain any other exclusion contrary to the Agreement.
(v) The policy shall give City, its officials, officers, employees, agents and City designated volunteers additional insured status using ISO endorsement forms CG 20 10 10 01 and 20 37 10 01, or endorsements providing the exact same coverage. (vi) The general liability program may utilize either deductibles or provide coverage excess of a self-insured retention, subject to written approval by the City, and provided that such deductibles shall not apply to the City as an additional insured. b. Automobile Liability
(i) At all times during the performance of the work under this Agreement, the Consultant shall maintain Automobile Liability Insurance for bodily injury and property damage including coverage for owned, non-owned and hired vehicles, in a form and with insurance companies acceptable to the City.
(ii) Coverage for automobile liability insurance shall be at least as broad as Insurance Services Office Form Number CA 00 01 covering automobile liability (Coverage Symbol 1, any auto).
(iii) The policy shall give City, its officials, officers, employees, agents and City designated volunteers additional insured status. (iv) Subject to written approval by the City, the automobile liability program may utilize deductibles, provided that such deductibles shall not apply to the City as an additional insured, but not a self-insured retention.
c. Workers’ Compensation/Employer’s Liability
Agenda Item #10.7.

Page 202 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
5 (i) Consultant certifies that he/she is aware of the provisions of Section 3700 of the California Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and he/she will comply with such provisions before commencing work under this Agreement.
(ii) To the extent Consultant has employees at any time during the term of this Agreement, at all times during the performance of the work under this Agreement, the Consultant shall maintain full compensation insurance for all persons employed directly by him/her to carry out the work contemplated under this Agreement, all in accordance with the “Workers’ Compensation and Insurance Act,” Division IV of the Labor Code of the State of California and any acts amendatory thereof, and Employer’s Liability Coverage in amounts indicated herein. Consultant shall require all subconsultants to obtain and maintain, for the period required by this Agreement, workers’ compensation coverage of the same type and limits as specified in this section.
d. Professional Liability (Errors and Omissions)
At all times during the performance of the work under this Agreement the Consultant shall maintain professional liability or Errors and Omissions insurance appropriate to its profession, in a form and with insurance companies acceptable to the City and in an amount indicated herein.

This insurance shall be endorsed to include contractual liability applicable to this Agreement and shall be written on a policy form specifically designed to protect against acts, errors or omissions of the Consultant. “Covered Professional Services” as designated in the policy must specifically include work performed under this Agreement. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer's duty to defend. e. Minimum Policy Limits Required
(i) The following insurance limits are required for the Agreement:

Combined Single Limit
Commercial General Liability $1,000,000 per occurrence/ $2,000,000 aggregate for bodily injury, personal injury, and property
damage
Automobile Liability $1,000,000 combined single limit
Employer’s Liability $1,000,000 per accident or disease Professional Liability $1,000,000 per claim and aggregate (errors and omissions)
(ii) Defense costs shall be payable in addition to the limits. (iii) Requirements of specific coverage or limits contained in this section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance. Any available coverage shall be provided to the parties required to be named as Additional Insured pursuant to this Agreement.

Agenda Item #10.7.

Page 203 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
6 f. Evidence Required
Prior to execution of the Agreement, the Consultant shall file with the City evidence of insurance from an insurer or insurers certifying to the coverage of all insurance required herein. Such evidence shall include original copies of the ISO CG 00 01 (or insurer’s equivalent) signed by the insurer’s representative and Certificate of Insurance (Acord Form 25-S or equivalent), together with required endorsements. All evidence of insurance shall be signed by a properly authorized officer, agent, or qualified representative of the insurer and shall certify the names of the insured, any additional insureds, where appropriate, the type and amount of the insurance, the location and operations to which the insurance applies, and the expiration date of such insurance.
g. Policy Provisions Required
(i) Consultant shall provide the City at least thirty (30) days prior written notice of cancellation of any policy required by this Agreement, except that the Consultant shall provide at least ten (10) days prior written notice of cancellation of any such policy due to non-payment of premium. If any of the required coverage is cancelled or expires during the term of this Agreement, the Consultant shall deliver renewal certificate(s) including the General Liability Additional Insured Endorsement to the City at least ten (10) days prior to the effective date of cancellation or expiration.
(ii) The Commercial General Liability Policy and Automobile Policy shall each contain a provision stating that Consultant’s policy is primary insurance and that any insurance, self-insurance or other coverage maintained by the City or any named insureds shall not be called upon to contribute to any loss.
(iii) The retroactive date (if any) of each policy is to be no later than the effective date of this Agreement. Consultant shall maintain such coverage continuously for a period of at least three years after the completion of the work under this Agreement. Consultant shall purchase a one (1) year extended reporting period A) if the retroactive date is advanced past the effective date of this Agreement; B) if the policy is cancelled or not renewed; or C) if the policy is replaced by another claims-made policy with a retroactive date subsequent to the effective date of this Agreement.
(iv) All required insurance coverages, except for the professional liability coverage, shall contain or be endorsed to provide a waiver of subrogation in favor of the City, its officials, officers, employees, agents, and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subconsultants.
(v) The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability.

Further the limits set forth herein shall not be construed to relieve the Consultant from liability in excess of such coverage, nor shall it limit the Consultant’s indemnification obligations to the City and shall not preclude the City from taking such other actions available to the City under other provisions of the Agreement or law.
h. Qualifying Insurers
Agenda Item #10.7.

Page 204 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
7 (i) All policies required shall be issued by acceptable insurance companies, as determined by the City, which satisfy the following minimum requirements:
(1) Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A:VII and admitted to transact in the business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.
i. Additional Insurance Provisions
(i) The foregoing requirements as to the types and limits of insurance coverage to be maintained by Consultant, and any approval of said insurance by the City, is not intended to and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Consultant pursuant to this Agreement, including but not limited to, the provisions concerning indemnification.
(ii) If at any time during the life of the Agreement, any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement.
(iii) The City may require the Consultant to provide complete copies of all insurance policies in effect for the duration of the Project. (iv) Neither the City nor any of its officials, officers, employees, agents or volunteers shall be personally responsible for any liability arising under or by virtue of this Agreement.
j. Subconsultant Insurance Requirements. Consultant shall not allow any subcontractors or subconsultants to commence work on any subcontract until they have provided evidence satisfactory to the City that they have secured all insurance required under this section.

Policies of commercial general liability insurance provided by such subcontractors or subconsultants shall be endorsed to name the City as an additional insured using ISO form CG 20 38 04 13 or an endorsement providing the exact same coverage. If requested by Consultant, City may approve different scopes or minimum limits of insurance for particular subcontractors or subconsultants.

12. Indemnification.
a. To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing), indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant’s services, the Project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses. Consultant's obligation to indemnify Agenda Item #10.7.

Page 205 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
8 shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, or volunteers.
b. If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance of “design professional” services (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.

13. California Labor Code Requirements.
a. Consultant is aware of the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects (“Prevailing Wage Laws”). If the services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It shall be mandatory upon the Consultant and all subconsultants to comply with all California Labor Code provisions, which include but are not limited to prevailing wages (Labor Code Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5), certified payroll records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section 1777.1). The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4. b. If the services are being performed as part of an applicable “public works” or “maintenance” project, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Consultant and all subconsultants performing such services must be registered with the Department of Industrial Relations. Consultant shall maintain registration for the duration of the Project and require the same of any subconsultants, as applicable. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1. c. This Agreement may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements. Any stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor that affect Consultant’s performance of services, including any delay, shall be Consultant’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Consultant caused delay and shall not be compensable by the City. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor.

Agenda Item #10.7.

Page 206 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
9 14. Safety.

Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and life-saving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

15. Verification of Employment Eligibility.

By executing this Agreement, Consultant verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subconsultants and sub-subconsultants to comply with the same.

16. INTENTIONALLY DELETED

17. Laws and Venue.

This Agreement shall be interpreted in accordance with the laws of the State of California.

If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a the Superior Court of California for the County of Napa.

18. Termination or Abandonment
a. City has the right to terminate or abandon any portion or all of the work under this Agreement by giving ten (10) calendar days written notice to Consultant. In such event, City shall be immediately given title and possession to all original field notes, drawings and specifications, written reports and other documents produced or developed for that portion of the work completed and/or being abandoned. City shall pay Consultant the reasonable value of services rendered for any portion of the work completed prior to termination. If said termination occurs prior to completion of any task for the Project for which a payment request has not been received, the charge for services performed during such task shall be the reasonable value of such services, based on an amount mutually agreed to by City and Consultant of the portion of such task completed but not paid prior to said termination. City shall not be liable for any costs other than the charges or portions thereof which are specified herein. Consultant shall not be entitled to payment for unperformed services, and shall not be entitled to damages or compensation for termination of work.
b. Consultant may terminate its obligation to provide further services under this Agreement upon thirty (30) calendar days’ written notice to City only in the event of substantial failure by City to perform in accordance with the terms of this Agreement through no fault of Consultant.

Agenda Item #10.7.

Page 207 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
10 19. Ownership of Documents and Confidential Information. a. All deliverables and other documents generated by Consultant in the performance of the Services, including all work papers, work-in-progress, designs, drawings, documents, data, computations, specifications, studies and reports prepared by Consultant as a part of the Services or authorized Additional Services (“Consultant Work Product”) shall belong to and be subject to the sole ownership and use of City. b. Except as otherwise provided in “Termination or Abandonment,” above, all original field notes, written reports, drawings and specifications and other documents, produced or developed for the Project shall, upon payment in full for the services described in this Agreement, be furnished to and become the property of the City. c. During the course of the performance of this Agreement, Consultant may receive written or verbal information from City, its representatives or agents, not in the public domain. Such information may include City’s know how, trade secrets, and other proprietary and confidential information and Consultant agrees to treat such information as confidential information belonging to City. Consultant agrees that neither it, nor its officers, employees, representatives, agents, successors, or assigns, will disclose such information to any third party or use the same in any manner without the prior written consent of City. Moreover, Consultant agrees to safeguard such proprietary and confidential information from unauthorized disclosure and/or use using the same degree of care it uses to protect its own proprietary and confidential information, but not less than a reasonable standard of care. In the event that disclosure of such information is sought pursuant to any law or regulation, Consultant shall promptly notify City of such fact to allow City to assert whatever exclusions or exemptions may be available to it under applicable law or regulation.

20. Organization
Consultant shall assign Cody Anderson as Project Manager. The Project Manager shall not be removed from the Project or reassigned without the prior written consent of the City.

21. Limitation of Agreement.

This Agreement is limited to and includes only the work included in the Project described above.

22. Notice
Any notice or instrument required to be given or delivered by this Agreement may be given or delivered by depositing the same in any United States Post Office, certified mail, return receipt requested, postage prepaid, addressed to:

CITY:

City of St. Helena
1088 College Avenue, St. Helena, CA 94574
Attn: Joseph Leach, Public Works Director
CONSULTANT:

Sherwood Design Engineers, Ltd.

PO Box 849598
Los Angeles, CA 90087-9598
and shall be effective upon receipt thereof.

Agenda Item #10.7.

Page 208 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
11 23. Third Party Rights
Nothing in this Agreement shall be construed to give any rights or benefits to anyone other than the City and the Consultant.

24. Equal Opportunity Employment.

Consultant represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

25. Entire Agreement
This Agreement, with its exhibits, represents the entire understanding of City and Consultant as to those matters contained herein, and supersedes and cancels any prior or contemporaneous oral or written understanding, promises or representations with respect to those matters covered hereunder. Each Party acknowledges that no representations, inducements, promises or agreements have been made by any person which are not incorporated herein, and that any other agreements shall be void. This Agreement may not be modified or altered except in writing signed by both Parties hereto. This is an integrated Agreement.

26. Severability
The unenforceability, invalidity or illegality of any provision(s) of this Agreement shall not render the remaining provisions unenforceable, invalid or illegal.

27. Successors and Assigns
This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators and assigns of each Party to this Agreement. However, Consultant shall not assign or transfer by operation of law or otherwise any or all of its rights, burdens, duties or obligations without the prior written consent of City. Any attempted assignment without such consent shall be invalid and void.

28. Non-Waiver
None of the provisions of this Agreement shall be considered waived by either Party, unless such waiver is specifically specified in writing.

29. Time of Essence
Time is of the essence for each and every provision of this Agreement.

30. City’s Right to Employ Other Consultants
City reserves its right to employ other consultants, including engineers, in connection with this Project or other projects.

Agenda Item #10.7.

Page 209 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
12 31. Prohibited Interests
Consultant maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no director, official, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.
[SIGNATURES ON FOLLOWING PAGE]
Agenda Item #10.7.

Page 210 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
13 SIGNATURE PAGE FOR PROFESSIONAL SERVICES AGREEMENT
BETWEEN CITY OF ST. HELENA
AND SHERWOOD DESIGN ENGINEERS LTD.

IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date first written above.

CITY OF ST. HELENA Sherwood Design Engineers, Ltd.

By: By:

Anil Comelo Its:

City Manager
Printed Name:

ATTEST:

By:

Ethan Walsh, City Attorney

Agenda Item #10.7.

Page 211 of 383 ends

Sherwood Design Engineers/Mills Lane and Highway 29
Intersection Improvements
14 EXHIBIT A
Scope of Services
Agenda Item #10.7.

Page 212 of 383 ends

Hwy 29 & Mills Lane Improvements
St. Helena, CA
Scope and Fee Proposal
for
Civil Engineering Services
Permitting Documents
Sherwood Design Engineers
September 8, 2025
Agenda Item #10.7.

Page 213 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 2 / 13 Scope and Fee Proposal
September 8, 2025
City of St. Helena
Attn: Mario Traverso
City of St. Helena | Public Works
1088 College Avenue | St. Helena, CA 94574
(707) 204-9084 | [email protected]
RE: Scope and Fee Proposal for Civil Engineering Services Mills Lane & Hwy 29 Improvements
Permit and Construction Documents
Mr. Traverso,
In response to your request, Sherwood Design Engineers (“Sherwood” hereinafter) is pleased to submit this proposal to the City of St. Helena (the “Client” hereinafter) for engineering services for improvements to Mills Lane and Hwy 29 in the City of St. Helena, CA. This proposal describes professional civil engineering services to be performed by Sherwood in collaboration, as appropriate, with the Client’s other design team members and their consultants (the “Design Team” hereinafter).

We will initiate proposed services upon the approval of this proposal.

1.0 PROJECT UNDERSTANDING
This phase of work includes public right of way improvements previously associated with the Farmstead Lodging project, which has been on indefinite hold. As requested by the City, Sherwood will update our design documents and resume the permitting process in collaboration with the City. • Design, permitting, and construction of Mills Lane realignment (does not include relocation of PG&E power lines)
• Design, permitting, and construction of revised Hwy 29 intersection Sherwood Design Engineers will work collaboratively with the City and other governing agencies to complete the contracted civil engineering services in accordance with appropriate requirements of the governing agencies. The understood scope of work has been established by the City and consists of civil engineering services for the required improvements.

This proposal is valid for 60 days from date submitted to [Insert Full Client Name]. Any proposed project or portion thereof not accepted during this timeframe, will become void and will require a new proposal if requested in the future.

Sherwood will initiate proposed services upon the written approval of these terms and conditions or upon receipt of a written Notice to Proceed that identifies that a formal signed contract will be forthcoming from the client.

2.0 PROJECT UNDERSTANDING
The project includes public right of way improvements previously associated with the Farmstead Lodging project, which has been on indefinite hold. As requested by the City, Sherwood will update our design documents and support the City of St. Helena in resuming the permitting process for public improvements to Mills Lane and an improved intersection at Hwy 29 and Grayson Ave.

Agenda Item #10.7.

Page 214 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 3 / 13 Sherwood will work closely in a collaborative manner with the Design Team to complete the contracted civil engineering services in accordance with appropriate requirements of the governing agencies. The understood scope of work has been established by the City of St. Helena and consists of civil engineering services as described below.

Every project is subject to specific requirements and conditions that cannot be fully anticipated and may require additional documentation and support not covered in the original scope. If additional scope items are identified, outside those listed within this proposal Sherwood will work with the Client to develop an Additional Services agreement for approval prior to advancing the work.

2.1 Limits of Work
The Limits of Work for this project encompasses the area(s) bounded in Exhibit A. Any additional work not included herein may be scoped in a separate contract.

3.0 PROJECT PHASING AND DELIVERABLES
Sherwood proposes the following design phases relative to the anticipated permit approvals process, planning documents, and construction documents production. Each phase is intended to enhance the design upon successive approvals to help the project realize the intended design upon completion.

The proposed design phases for this project are:

1. Intersection Improvements
a. Permit Documents
b. Permitting Support
c. Construction Documents
d. Construction Administration

2. Mills Lane Realignment
a. Permit Documents
b. Construction Documents
c. Construction Administration

3. Stormwater Pollution Prevention Plan (SWPPP)
It is understood that Sherwood will provide electronic files to the Client for submittal to the appropriate stakeholders and design review committee. Refer to phase(s) below for specific deliverables.

3.1 Intersection Improvements
Upon authorization, Sherwood will restart the design and permitting effort of the improved intersection of Hwy 29, Grayson Ave, and Mills Lane. Improvements will be consistent with the Hwy 29 Specific Plan and Development Agreement for the project with the assumptions listed in Section 5.0 in this agreement.

Intersection plans will include a new at-grade crossing of the existing train tracks and relocation of railroad equipment as directed by the railroad operator. The plans prepared in this phase will be used for coordination with the Town and Caltrans, permitting, cost estimation, and construction. There will be two (2) milestones during this phase of the project: 50%, 90% and 100% CD. This scope includes the following services and deliverables:

1. General Initiation/Coordination/Meeting(s)

2. Site Visit(s)

3. Demolition Plan

4. Grading & Drainage Plan

5. Striping Plan

6. Temporary Traffic Control Plan
Agenda Item #10.7.

Page 215 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 4 / 13

7. Signal Plan including: detector loops, hand holes, detector lead in cable, pull boxes, conduit and conductors, and traffic signal improvements.

8. Utility Plan (showing existing to remain, new recycled water line, and revised drainage)

9. Stormwater Control Plan

10. Detail Sheets

11. Specifications (Caltrans Standard Specifications)
Deliverables include:

1. Attend two (2) Design Team coordination meeting(s) (local).

2. One (1) Site Visit.

3. Four (4) Agency Coordination meetings.

4. One (1) Submittal to Client of the 90% Civil Engineering Construction Document package for Permit submittal.

5. One (1) Submittal to Client of 100% Civil Engineering Construction Document package stamped and signed for Permit re-submittal, addressing plan check comments.

6. Issue (1) Submittal of the Stormwater Control Plan

3.2 Mills Lane Realignment
Upon authorization, Sherwood will prepare permit and construction documents for the realignment of Mills Lane. Improvements will be consistent with the approved Farmstead Development Agreement and will include the new alignment from Hwy 29 to the nearest tie in point along the existing section of Mills that does not required relocation of existing utility poles. Plans will also include a new driveway connection to the Gold property to the north of Mills Lane. Sherwood anticipates that the plans delivered in this phase will be used for City and agency reviews, cost estimations, obtaining the building permit, bidding and for the purpose of construction. There will be two (2) milestones during this phase of the project: 90% and 100% CD. This scope includes the following services and deliverables:

1. General Initiation/Coordination/Meeting(s)

2. Site Visit(s)

3. Erosion Control Plan

4. Demolition Plan

5. Grading Plan with Road Profiles

6. Drainage Plan

7. Utility Plan

8. Stormwater Control Plan

9. Detail Sheets

10. Specifications
Deliverables include:

1. Attend two (2) Design Team coordination meeting(s) (local).

2. One (1) Site Visit.

3. Four (4) Agency Coordination meetings.

4. One (1) Submittal to Client of the 90% Civil Engineering Construction Document package for Permit submittal.

5. One (1) Submittal to Client of 100% Civil Engineering Construction Document package stamped and signed for Permit re-submittal, addressing plan check comments.

6. Issue (1) Submittal of the Stormwater Control Plan

3.3 Management & Coordination
Upon authorization, Sherwood will assist the Owner with overall project management and coordination.

Management assistance will be provided on a time & materials as-requested basis in order to best supporting an efficient process of coordinated design with the Town of St Helena. This phase is intended to allow for additional management work not included in the design phases above. Anticipated efforts include but are not limited to:

1. Preparation and maintenance of project schedule

2. Meetings with City and their consultants beyond what is included in design phases Agenda Item #10.7.

Page 216 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 5 / 13

3. Management of permitting process with City

4. Assist Owner with engagement of contractor, surveyor, or others

5. Assist Owner with preparation of completed permit applications to City, Caltrans, and CA PUC.

3.4 Construction Administration
Upon agreement with the Client, Sherwood will perform typical Construction Administration (CA) services during this phase of the project related to designs based on information available during final Construction Document submittal. The actual effort required by Sherwood during Construction Administration is highly dependent on field conditions encountered, contractor scheduling/sequencing, and contractor means and methods. Assumed fees for this phase are based on typical conditions and processes and may vary based on conditions outside of Sherwood’s control. Anticipated scope of services to provide general support to the Client during the construction schedule include:

1. Attend one (1) on site pre-construction conference / kick-off meeting.

2. Attend site visits during construction for observation of available work in terms of general conformance to construction documents.

3. Civil CA efforts in this phase include the following standard civil engineering services:
a. Review of civil related Submittals and Shop Drawings. b. RFI Response / Design Clarifications.
c. Attend final punch list site visit

4.0 ADDITIONAL PROJECT SCOPE & SERVICES (NOT INCLUDED IN PROPOSED FEE) The following are some services that are not included in this proposal. Sherwood would be pleased to provide these and other additional services that may become necessary as the project proceeds.

Additional services will be provided for additional mutually satisfactory compensation.

1. Separate project specifications (CSI format) not included in Section 2.0.

2. Preparation of traffic studies or other unanticipated deliverables associated with Caltrans permitting

3. Agency Submittals due to unanticipated permit staging of full permits.

4. More than one (1) Agency plan check comments and requested plan set resubmittal (not including previously addresses issues).

5. Major utility repair or realignment.

6. Construction routing and Traffic Control Plan.

7. Operation and Maintenance Plans.

8. Revisions to/or subsequent iterations of plans due to changes in agency requirements, design review or client.

9. Review/Respond to any issues related to unforeseen complications not known during initiation of agreement; including but not limited to utility and other subsurface conflicts and circulation changes.

10. Contractor and client initiated design revisions.

11. Additional Meeting(s).

12. Construction Staging Plan.

13. Clarifying Studies

14. Exhibits or other unanticipated agency requirements.

5.0 ASSUMPTIONS
The following items, if applicable, are to be provided by the Client prior to commencement of work:

1. Design will be based upon the Client’s approved site plan layout and provided to Sherwood in AutoCAD.

2. Design level Site Survey and all available line work of existing conditions in AutoCAD format.

3. Available site utility information, record documents, existing engineering and utility analysis.

4. Building finish floor elevations.

5. Historical project information.

Agenda Item #10.7.

Page 217 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 6 / 13

6. Environmental Assessments Reports.

7. Geotechnical Engineering Report.

8. Arborist Reports.

Additional Assumptions:

1. Phase durations will generally correspond to those shown in section 5.0. Extensions to the project schedule and associated engineering efforts will be addressed by contract addendum.

2. Should value engineering or incorporation of addenda and other modifications be required after completion of the 100% CDs/ Bid Documents/Permit Set, Sherwood Design Engineers will complete necessary changes (on a Time and Material (T&M) Basis, with a stipulated cap), agreed upon by the Client, prior to commencing our work.

3. This scope/fee is based on the discussion with the City of St. Helena in June 2025 in which the desire to complete Mills Lane and Hwy 29 improvements was discussed. Changes to the scope or schedule as described may result in additional civil engineering efforts that will be addressed by contract addendum.

4. The City of St. Helena will provide a stormwater management connection location within the project footprint. Sherwood has identified that a permanent conveyance of stormwater does not currently exist within this stretch of Mills Lane. Sherwood will not be responsible for designing or permitting a new storm drain outfall as part of this project.

5. If necessary, an updated signed and stamped survey of the project site will be provided by the client prior to the commencement of the design phase.

6. Sherwood is not responsible for any inconsistencies with the survey identified in the field that affect civil engineering and/or landscape design drawings. Sherwood would be prepared to modify design drawings to remedy unforeseen site conditions based upon an agreed upon additional scope and fee.

7. Structural design, including site elements associated with earthwork retention and sign/lighting footing design, is not included in this scope of work unless specifically identified in Section 2.0.

8. Unless specifically identified in the RFP, it is assumed that Sherwood and the Design Team will deliver plans and supporting documents consistent with Sherwood Design Engineers standard styles in keeping with accepted standards of care. Changes to presentation formats, including additional plan sheets, use of specific fonts, note and keynotes usage, CAD layers, sheets size, or other styles introduced during the design process and resulting in additional unanticipated efforts will be addressed by contract addendum.

9. If this contract were to be placed on hold for more than thirty days, Sherwood reserves the right to redistribute staff to other projects and would require a two-week remobilization effort and a renegotiation of our terms of service to restart the effort.

10. The client may not copy, republish or use any imagery provided by Sherwood as part of any submissions as this imagery may be subject to copyright infringement. Sherwood relinquishes all responsibility for use of any copy-righted image that is furnished to the client as part of any submission.

6.0 BASIC AND ADDITIONAL FEES FOR SERVICES
Fixed Fee: Fees below will be billed on a fixed fee basis in accordance with Attachment I. Fee estimates are based on the schedule below and are subject to revision based on changes to this schedule. Additional services can be provided upon written request and will be billed on a Time and Materials basis or by contract addendum.

A. BASIC SERVICES Schedule Fee Estimate
Estimated
Reimbursable
Expenses

2.0 Project Scope and Fees
Agenda Item #10.7.

Page 218 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 7 / 13 A. BASIC SERVICES Schedule Fee Estimate
Estimated
Reimbursable
Expenses
Mills Lane Improvements 16 weeks $45,000
Hwy 29 Intersection Improvements 16 weeks $35,000
Project Management & Coordination 16 weeks $10,000
Total Fee Estimate $90,000 $1,000
*Duration is defined as elapsed time from initiation of phase or scope of work upon our receipt of your written authorization to proceed.

7.0 EXCLUSIONS
Sherwood shall not be required to provide the following services:

1. Agency Fees

2. Geotechnical Report

3. Legal Descriptions

4. Foundation/ Structural Design

5. Construction Staking Site Cleanup

6. Mitigation of contaminants resulting from
unidentified leaking above ground or
underground storage tanks

7. Soils testing, remediation, removal, or
cathodic protection design

8. Percolation tests

9. MEP Design Service

10. Hazardous Waste Remediation

11. Materials Testing and Inspection reports.

12. O&M plans for Mechanical systems

13. Building Waterproofing – other than items
in scope

14. Utility demand engineering for electrical
service, gas services, telecommunication
service, streetlights and sidewalk lights

15. Connection location for buildings by
others; electric meter and gas meter
layout by MEP consultant

16. Traffic Engineering and Traffic Studies

17. Verification or inspection of construction
activities in the field.

18. Flow/pressure or hydrant flow test

8.0 REIMBURSABLE EXPENSES
Reimbursable costs as defined in the schedule will be billed in accordance with Sherwood Design Engineers' Fee Schedule – see Attachment II. Ordinary expenses of approximately 10 percent of the labor budget should be anticipated.

9.0 INITIATION
For your reference, copies of our current fee schedule and our Standard Terms and Conditions have been included with this proposal and will be part of this agreement. Should you find the terms of this proposal acceptable, please sign and return via email to Cody Anderson at [email protected].

Sherwood Design Engineers thanks you for this opportunity to submit this proposal and look forward to beginning work with you on this exciting project!
Sincerely,
Cody Anderson, PE
Managing Principal
Agenda Item #10.7.

Page 219 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 8 / 13 EXHIBIT A – LIMIT OF WORK
Agenda Item #10.7.

Page 220 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 12 / 13

ATTACHMENT II

PROFESSIONAL PERSONNEL SERVICE FEES
JANUARY 1, 2025 – DECEMBER 31, 2025
Personnel Rate
Associate Principal $ 260
Senior Engineer $ 250
Senior Project Manager $ 250
Director of Technology $ 240
Project Manager $ 240
Senior Project Engineer / Strategist $ 240
Project Engineer / Strategist $ 220
Design Engineer III $ 205
Designer III $ 200
CAD Manager $ 195
Design Engineer II / Designer II $ 195
Senior CAD Technician $ 195
Design Engineer I / Designer I $ 185
CAD Technician $ 165
Graphic Designer $ 165
Project Assistant $ 145
Principals’, Managing Principals’ and Design Principals’ time on projects is chargeable at $ 285 to $ 350 per hour.

Charges for outside services, equipment, and facilities not furnished directly by Sherwood Design Engineers will be billed at cost plus 10%. Such charges may include, but shall not be limited to, printing reproduction services; shipping, delivery, and courier charges; sub-consultant fees and expenses; special fees, permits and insurance; transportation on public carriers, and consumable materials. Mileage will be charged at the prevailing IRS rate per mile.

These rates apply to the current period and are subject to increase by SDE each January 1 and July 1 or when foreign exchange rates cause the hourly rates to decrease in relation to the USD by more than 5% from the rate at the date of this Proposal.

Agenda Item #10.7.

Page 221 of 383 ends

2548 MISSION STREET, SAN FRANCISCO, CA 94110
+1 (415) 677-7300 | WWW.SHERWOODENGINEERS.COM
250708_Mills & Hwy29 DRAFT.docx SCOPE & FEE PROPOSAL | 13 / 13

ACKNOWLEDGEMENT
The respective obligations of the parties are set forth in the Proposal, including any schedules or exhibits referred to therein, and in the ATTACHMENT I - STANDARD TERMS AND CONDITIONS which is attached to the Proposal and made a part thereof. If both the Client and Owner have signed this Acknowledgement, both shall be responsible jointly and severally to pay amounts invoiced and due to Sherwood Design Engineers.

Proposal:

Letter dated for the
Billing: Preferred Billing Method: ☐ US Mail ☐ Email ☐ Both Billing contact name:

Billing contact email:

Special Instructions:

Client Owner
Full Legal Name: Full Legal Name:

Attention: Attention:

Address: Address:

Federal Tax ID: Federal Tax ID:
x x
Agreed For Client Title Date Agreed For Owner Title Date Sherwood Design Engineers:

This agreement is with only the following identified entity which is solely responsible to provide the Service:

Sherwood Design Engineers, Ltd - 2548 Mission Street, San Francisco, CA 94110, USA x
Agreed For Sherwood Design Engineers Title Date
Remittance Address: Sherwood Design Engineers, P.O. Box 849598, Los Angeles, CA 90084-9598 Agenda Item #10.7.

Page 222 of 383 ends

Agenda Report to the City Council
Agenda Section: CONSENT ITEMS
Department: Public Works
DATE: November 25, 2025
FROM: Jose Calderon, Engineering Technician II, Mario Traverso, Project Manager
SUBJECT: Consider and adopt a Resolution updating the City of St.

Helena Design and Construction Standards

RECOMMENDED
ACTION:

Approve the resolution.

PREVIOUS COUNCIL
ACTION:
6/22/1993 Resolution No. 93-58 - Adoption of Water and
Sewer Technical Standards
11/23/1993 Resolution No. 93-134 - Adoption of Streets, Storm and Sidewalk Technical Standards
6/23/1998 Resolution No. 98-57 - Revision of Streets,
Storm and Sidewalk Standards
11/27/2015 Resolution No. 2015-132 - Revision of Trench Standards

STATEMENT OF THE
PURPOSE:

The purpose of this action is to approve an update to the City of St. Helena Design and Construction Standards.

FINANCIAL IMPACT: None
BACKGROUND:

The City Design and Construction Standards are a collection of graphical exhibits and instructions which define the means, methods, configurations and products to be used by contractors who perform work within the City Right-of-Way and on City infrastructure.

All contractors performing work within the City are required to adhere to these standards to ensure consistency, safety, and quality of the public infrastructure. The Design and Construction Standards specify a wide variety of public infrastructure ranging from the widths of streets and sidewalks to detailed instructions regarding the installation of water pipelines.

The current collection of Design and Construction Standards were developed and approved in 1993 and 1998 with revisions in 2015. The Standards are due to be updated to reflect updates in products, materials, methods and construction practices.

In 2019, Staff initiated an update to its existing City Design and Construction Standards.

DISCUSSION:

The 2019 update effort stalled for a variety of reasons and in 2024 Staff reinitiated the update effort. City Engineering and Operations Staff conducted a comprehensive review of the City’s Design and Construction Standards. The review and update to the standards has been completed, which have been modified to reflect current industry Agenda Item #10.8.

Page 223 of 383 ends

practices, updated materials, configurations and construction methods. The table of contents of the updated standards and an example of an updated standard is found in Attachment 1.

There are two major categories of content which has been updated. The first are updates that include revisions to products and materials which now align with technological and industry advances. This includes items such as pipe materials, pipe systems, concrete and asphalt concrete mix designs, materials, and safety devices.

The second are updates that include revisions to design standards and methods. This includes items such as pedestrian facilities, roadway striping, trenching methods and surface restoration, utility layouts and separations, inspection and disinfection procedures. These updates are essential to ensure the continued safety, reliability, and efficiency of the City's public infrastructure.

The updated standards are posted on the City's website and can be viewed at https://cityofsthelena.gov/921/7636/Public-WorksStandards?activeLiveTab=widgets.Upon approval by the City Council, the City will officially transition to distribution and use of the updated City Standards.

ENVIRONMENTAL REVIEW: None
GOAL:

Goal 2: Improve Infrastructure & Further Environmental Sustainability Goal 3: Pursue Water Security & Sustainable Management of Water Resources Goal 5: Enhance Quality of Life
Goal 8: Implement Capital Improvement Plans (CIP) Projects Miscellaneous/Other DOCUMENTS ATTACHMENTS:

Attachment 1 - Table of Contents and Example
Attachment 2 - Resolution
Agenda Item #10.8.

Page 224 of 383 ends

CITY OF ST. HELENA

STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS
ADOPTED NOVEMBER 25, 2025
Agenda Item #10.8.

Page 225 of 383 ends

TABLE OF CONTENTS
WATER
101 WATER MAIN CONSTRUCTION NOTES
101A WATER MAIN CONSTRUCTION NOTES CONTINUED
102 FIRE HYDRANT INSTALLATION
102A FIRE HYDRANT LOCATION
102B FIRE HYDRANT MARKER LOCATION
103 1" WATER SERVICE
103A 2" WATER SERVICE
103B 2” MANIFOLD MUTILPLE SERVICES
103C 2” MANIFOLD MUTILPLE SERVICES NOTES
103D 4” DUCTILE IRON MANIFOLD MULTI – SERVICES
103E 4” DUCTILE IRON MANIFOLD MUTIPLE SERVICES NOTES
104 4” WATER SERVICE FOR 3” METER
104A 4” WATER SERVICE FOR 3” METER NOTES AND PARTS LIST 104B 4” WATER SERVICE FOR 4” METER
104C 4” WATER SERVICE FOR 4” METER NOTES AND PARTS LIST 104D 6” WATER SRRVICE FOR 6” METER
104E 6” WATER SERVICE FOR 6” METER NOTES AND PARTS LIST 106 ¾” THRU 4” REDUCED PRESSURE PRINCIPAL BACKFLOW ASSEMBLY 106A 4” THRU 10” DOUBLE DETECTOR FIRE LINE BACKFLOW ASSEMBLY 106B 4” THRU 10” DOUBLE DETECTOR FIRE LINE BACKFLOW ASSEMBLY NOTES 108 TAPPING SADDLE 4” AND OVER
108A TAPPING SADDLE 4” AND OVER
109 COMBINATION FIRE & DOMESTIC SERVICE MASTER METER ASSEMBLY 109A COMBINATION FIRE & DOMESTIC SERVICE MASTER METER ASSEMBLY NOTES 110 COMBINATION SERVICE STUB COMMERCIAL & MULTI-RESIDENTIAL 110A COMBINATION SERVICE STUB COMMERCIAL & MULTI-RESIDENTIAL 111 GATE VALVE, STEM EXTENSION AND BOX WITH RISER
111A VALVE STEM EXTENSION ASSEMBLY
111B BUTTERFLY VALVE INSTALLATION
111C VALVE, ANCHOR, TIE DOWN
112 6” AND 8” BLOW-OFF
112A END OF LINE DETAIL BLOW-OFF APPLICATION
112B TEMPORARY BLOWOFF AND/OR METERED CONNECTION – MAINS UNDER

CONSTRUCTION
112C TIE DOWN CONNECTION AND PIPE CONNECTIONS
112D TYPICAL SYSTEM RESTRAINT LENGTHS
Agenda Item #10.8.

Page 226 of 383 ends

113 WATER SAMPLING STATION
115 CONCRETE ANCHOR BLOCKS: VERTICAL AND COMBINATION BEND

APPLICATIONS
115A CONCRETE THRUST BLOCKS: HORIZONTAL APPLICATIONS
115B CONCRETE THRUST BLOCKS: HORIZONTAL APPLICATIONS NOTES 116 HARNESS INSTALLATION FOR FLANGE FITTINGS
117 WATER MAIN UNDER STRUCTURE LOWERING
118 WATERMAIN OVER STRUCTURE
122 WATER MAIN AND MAIN LINE VALVE ALIGNMENT
123 BORE, AND JACK CASING, SPACER AND END SEAL
127 PRESSURE REDUCING VALVE
127A SURGE ANTICIPATOR VALVE OR PRESSURE RELIEF VALVE NOTES 127B SURGE ANTICIPATIOR VALVE
128 AIR AND VACUUM / AIR RELEASE VALVE
128A 1” MANUAL AIR RELEASE VALVE CONNECTION
129 WATER SEPARATION REQUIREMENTS
129A PIPE TO PIPE CROSSING REQUIREMENTS
129B PIPE TO PIPE CROSSING REQUIREMENTS NOTES
130 EXTERIOR REDUCED PRESSURE BACKFLOW DEVICE INSTALLATION FOR 3” TO 8”

WATER SERVICES

SANITARY SEWER
201 48” PRECAST MANHOLE SANITARY SEWER
202 60” PRECAST MANHOLE SANITARY SEWER
203 INSIDE DROP IN SANITARY SEWER MANHOLE
207 ABANDON PIPE PLUG DETAIL
208 ABANDON MANHOLE / VAULT
209 PRECAST CONCRETE MANHOLES REDUCER SLAB
210 STANDARD MANHOLE FRAME AND COVER
211 SEWER SERVICE LATERAL
211A BACKWATER CHECK VALVE INSTALLATION
212 SEWER SERVICE LATERAL CROSSING DETAILS
213 PIPE STRUCTURE CROSSING DETAILS
214 PLASTIC SEWER PIPE DEFLECTION MANDREL
215 PRECAST GREASE INTERCEPTOR
219 CLEANOUT DETAIL AT BUILDING
220 TYPICAL SERVICE CONNECTION DETAILS
221 SEWAGE BACKEATER VALVE ASSEMBLY
222 SEWER SEPARATION REQUIREMENTS
223 PIPE STRUCTURE CROSSING
Agenda Item #10.8.

Page 227 of 383 ends

STREETS
301 STANDARD HALF STREET SECTIONS
302 STRUCTURAL DESIGN CHART FOR FLEXIBLE PAVEMENTS
303 TRAFFIC CHART FOR FLEXIBLE PAVEMENTS
304 TYPICAL CUL-DE-SACS
305 STANDARD STREET KNUCKLE RESIDENTIAL & MINOR STREETS 306 HAMMERHEAD TURN AROUND RESIDENTIAL PRIVATE STREETS AND ACCESS WAYS
307 EMERGENCY VEHICLE TURNOUT
308 SIDE STREET, END OF OVERLAY AND LIP OF GUTTER CONFORM 310 STANDARD CURB AND GUTTER
313 STANDARD P.C.C. CROSS GUTTER
314 STANDARD DRIVEWAY APPROACH
314A STANDARD DRIVEWAY APPROACH DETACHED SIDEWALK
316 STANDARD CURB RETURN CURB GUTTER & SIDEWALK
316A STANDARD DETAILS SIDEWALK SECTIONS
317 ADA CURB RAMPS
319 TYPICAL SIDEWALK OBSTRUCTION TRANSITION
320 STREET WIDENING / PAVEOUT DETAIL
324 VISIBILITY AND FENCING REQUIREMENTS
325 REMOVABLE TRAFFIC BOLLARD DETAIL
326 STANDARD PERMENANT MONUMENT
327 TYPICAL METHODS FOR SETTING APPURTENANCES
328 STANDARD BARRICADE
328A SIDEWALK BARRICADE
329 STANDARD WOODS TYPE GUAD RAIL
331A STREET NAME SIGN INSTALLATION
331B STREET NAME SIGN INSTALLATION PRIVATE STREETS
332 STANDARD STREET SIGN
333 ADDRESS PAINTING ON CURB FACE
334A STANDARD RESIDENTIAL STREET LIGHT
334B STANDARD RESIDENTIAL STREET LICHT
334C STANDARD RESIDENTIAL STREET LIGHT
335 PAVEMENT MARKINGS
336A TRAFFIC CONTROL REQUIREMENTS

EARTHWORK
400 STANDARD TRENCH DETAILS
400A STANDARD BACKFILL DETAILS
Agenda Item #10.8.

Page 228 of 383 ends

STORMWATER
500 EROSION CONTROL
501 SIDEWALK UNDERDRAIN STORM DRAIN
502 48” CONCRETE MANHOLE STORM DRAIN UNDER 7’
502A 60” CONCRETE MANHOLE STORM DRAIN OVER 7’
503 STORM DRAIN PRESSURE MANHOLES – CONCRETE COLLARS
504 PRECAST CONCRETE MANHOLE REDUCER SLAB
507 SPECIAL APRONS FOR CATCH BASINS
508 CONCRETE V DITCH
509 CURB OPENING CATCH BASIN
509A MODIFICATIONS OF EXISTING CATCH BASIN TO ACCOMIDATE NEW CURB RAMP 510 PRECAST CATCH BASIN COVER STORM DRAIN
510A CATCH BASIN AND DROP INCLET NOTES
511 CATCH BASIN STANDARD TYPE “E”
511A TYPE “E” CATCH BASIN DETAIL
511B STORM DRAIN TYPE “A” CATCH BASIN OVER C.I.P.P.
511C STORM DRAIN MANHOLE OVER C.I.P.P.
512 STROM DRAIN GALLERY
513 STORM DRAIN INLET
513B FIELD DRAIN
514 STORM DRAIN LABELS
515 TYPICAL BIO-RETENTION UNIT 1
515A TYPICAL BIO-RETENTION UNIT 2
Agenda Item #10.8.

Page 229 of 383 ends

)> (') 0
""O :c ;o
""O ?.- )>
c§ ~
z
~ ~ C>
(/)
" 0 (/} ~
CD
)> ::::0
Orr,
AO
-,, C
ro
0 rr,
:E 0
""D -u
::::0 ::;o
rr, rr,
< (/) rr, (/) Zc
~ ::;o
Sci rr,
~ (/)
0 cf
m z
0 ;o
(/) fT1
() ~ )> ..... r
p:1 .....
..... z -.....J
0 I
z lO
fT1 .i,..
)>
""O
;o
0 ~
0 )>
~
"Tl
rr,
OJ
__.
lO
lO
vi
UNION
PIPING.VALVES, NIPPLES, ETC. SHALL~

BE THREADED BRASS OR GALVANIZED
FOR SIZES 2• OR LESS, AND SHALL BE

FLANGED DUCTILE IRON FOR

REDUCED PRESSURE BACKFLOW PREVENTION DEVICE
WATTS NO. 909, FEBCO SERIES 825Y, 825,
OR APPROVED EQUAL.

UNION
3• OR GREATER. r...--TEE WITH
METER AND VAUL~~
SEE STD. 102 OR •:~---'
tc::~;Tc11===============-:-!----
1-----J I \ I
I I \ I
I I \ I
If 'I
s·
I I i-==-===-i I I I I 7}--_......____ --~,
I I
I I
i.J
NOTES:

BRASS OR

COPPER LINE

1. REDUCED PRESSURE TYPE BLACKFLOW PREVENTION DEVICES

SHALL BE REQUIRED FOR ANY USE WHERE TOXIC MATERIALS

ARE USED OR WHERE POSITIVE PROTECTION FOR THE PUBLIC
WATER SUPPLY IS REQUIRED. TYPICAL APPLICATIONS INCLUDE:

IRRIGATION SERVICES, COMMERCIAL SERVICES, INDUSTRIAL SERVICES,

HOSPITALS, LABORATORIES, MORTUARIES, OR AS DETERMINED
BY THE CITY ENGINEER. (TITLE 17 CAL. ADMINISTRATION CODE)

2. APPROVED REDUCED PRESSURE TYPE BACKFLOW PREVENTION

DEVICES SHALL BE AS LISTED BY THE UNIVERSITY OF
SOUTHERN CALIFORNIA STUDY, LA TEST REVISION.
. .
1• PLUG
s• ABOVE INUNDATION
LEVEL OR 12• MIN.
• • • • A •
. . · . ..
3• THICK P.C.C. PAD
MIN. 2•-0• WIDE
- CONCRETE THRUST BLOCK----

NOT SHOWN - THRUST

BLOCK NOT REQUIRED
FOR 2• OR SMALLER

CONNECT TO
SYSTEM

3. BACKFLOW PREVENTION DEVICES SHALL BE INSTALLED

ADJACENT TO AND ON THE PROPERTY SIDE OF SIDEWALK
WHERE APPLICABLE. THE ASSEMBLY SHALL BE INSTALLED AS
CLOSE TO THE WATER METER LOCATION AS PRACTICAL.

4. DEVICE TO BE SAME SIZE OR LARGER THAN SERVICE METER.

5. LANDSCAPING OR OTHER SCREENING AROUND THE BACKFLOW

DEVICE SHALL BE AS SHOWN ON IMPROVEMENT PLANS, AS
APPROVED BY THE CITY ENGINEER.

Agenda Item #10.8.

Page 230 of 383 ends

12" MIN. ABOVE FINISHED

GRADE OR INUNDATION
LEVEL OR 24" MAXIMUM.
4" THICK CONCRETE
PAD MIN. 2'-0" WIDE
FOR 2" DIA. DEVICE
& LARGER.

NOTES:

1. SEE WATER SYSTEM DESIGN GUIDELINES.

2. REDUCED PRESSURE BACKFLOW ASSEMBLIES SHALL BE

REQUIRED FOR ALL NEW DOMESTIC SERVICES AND ANY

USE WHERE TOXIC MATERIALS ARE USED OR WHERE

POSITIVE PROTECTION OF THE PUBLIC WATER SUPPLY IS
REQUIRED. TYPICAL APPLICATIONS INCLUDE, ALL

INDUSTRIAL AND IRRIGATION SERVICES, PARKS,

HOSPITALS, MEDICAL AND DENTAL LABORATORIES,

MORTUARIES, INDUSTRIAL PLANTS AND DRY CLEANERS
OR AS DETERMINED BY THE CITY ENGINEER.

3. REDUCED PRESSURE BACKFLOW ASSEMBLIES SHALL BE

INSTALLED ADJACENT TO AND ON THE PROPERTY SIDE OF
SIDEWALK WHERE APPLICABLE. WHERE NO SIDEWALK

EXISTS, THE REDUCED PRESSURE BACKFLOW ASSEMBLY

SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO THE
WATER METER LOCATION. THERE SHALL BE NO TEE OR

BRANCH LINES BETWEEN THE WATER METER AND
ASSEMBLY LOCATION. ANY CONFLICTS SHALL BE

RESOLVED BY CONTRACTOR TO THE CITY ENGINEER'S
APPROVAL.

4. APPROVED REDUCED PRESSURE BACKFLOW ASSEMBLIES
SHALL BE AS SHOWN ON "LIST OF APPROVED BACKFLOW
PREVENTION ASSEMBLIES" (LATEST REVISION) BY THE

STATE OF CALIFORNIA WATER RESOURCE CONTROL

BOARD, DIVISION OF DRINKING WATER, INFORMATION FOR

PUBLIC DRINKING WATER SYSTEMS

5. ALL REDUCED PRESSURE BACKFLOW ASSEMBLIES SHALL
BE PROVIDED WITH A MINIMUM OF FOUR (4) TEST COCKS.

AND TWO (2) SHUT OFF VALVES.

6. THE PIPING FROM THE METER AND THE REDUCED

PRESSURE BACKFLOW ASSEMBLY ITSELF, MUST BE THE

SAME SIZE AS THE METER UNLESS OTHERWISE APPROVED
BY THE CITY ENGINEER.

7. FOR 2" PIPE DIAMETER OR LESS, A 12" LONG MINIMUM
BRASS NIPPLE OR TYPE " L " HARD TEMPER COPPER PIPE
IS REQUIRED AT BOTH UNDERGROUND ELBOWS.

8. A THERMAL EXPANSION TANK WHEN USED ON A DOMESTIC

SERVICE SHALL BE SIZED AND INSTALLED PER

MANUFACTURES RECOMMENDATION ON THE COLD WATER
SUPPLY LINE TO THE WATER HEATER.

9. AN ENCLOSURE IS RECOMMENDED FOR PROTECTION
FROM FREEZING AND VANDALISM.

10. SHUT OFF VALVES:

10.1. 3" AND LESS SHALL BE BALL VALVE

10.2. 4" AND GREATER SHALL BE RESILIENT SEAT GATE
VALVE.

11. ALL PIPING, VALVES, NIPPLES, ETC. SHALL BE THREADED BRASS.

11.1. 3" AND LESS SHALL BE TYPE "L" HARD-TEMPER
COPPER.

11.2. 4" AND GREATER SHALL BE FLANGED DUCTILE IRON.

12. PVC PIPE OR FITTINGS SHALL NOT BE USED.

13. IF PROPOSING TO INSTALL THIS DEVICE IN A FLOOD ZONE, CONTACT THE CITY ENGINEER FOR APPROVAL.

14. REDUCE PRESSURE BACKFLOW DEVICE MANUFACTURE
FROM APPROVED MATERIALS LIST.

REDUCED PRESSURE VALVE, TYP. SEE NOTES 2 & 3. CHECK VALVES.

TEST COCK, TYP. SEE NOTE 5.

SEE NOTE 12.

ENCLOSURE,
SEE NOTE 9.

SIDEWALK

METER COUPLING
OR FLANGE REQUIRED.

METER AND BOX
PER CITY STD.

NIPPLE 12" MIN.

SEE NOTE 7.

CONCRETE THRUST BLOCKS
SEE CITY STD 115 (4" AND LARGER ONLY).

BUILDING SERVICE
NIPPLE 12" MIN.

SEE NOTE 7.

SHUT OFF VALVE TYP SEE NOTES 5
& 10
DRAWN:

SCALE:

CHK:

APPVD:

DATE:

STD. NO.

APPROVED BY:

JOSEPH LEACH, P.E.

JL PUBLIC WORKS DIRECTOR MT 106
3 4" THRU 4"

REDUCED PRESSURE PRINCIPLE

BACKFLOW ASSEMBLY
PL
NONE JAN 2025
Agenda Item #10.8.

Page 231 of 383 ends

CITY OF ST. HELENA
RESOLUTION NO. 2025 -

A RESOLUTION ADOPTING UPDATED CITY DESIGN

AND CONSTRUCTION STANDARDS

RECITALS
A. Construction in the City occurs on a regular basis; and B. Design and Construction Standards promote consistency and prescribe expectations concerning the maintenance and improvement of City infrastructure; and C. The current City Design and Construction Standards were developed and adopted in 1993 and 1998 and last updated in 2015; and
D. The Design and Construction Standards have been updated to incorporate local, state and federal best practices; and
E. The Design and Construction Standards will continue to be updated to incorporate changes in best practices, products, construction means and methods: and F. The Design and Construction Standards will be kept on file at City Hall, available on the City’s website and distributed in association with construction within the City.

RESOLUTION
The City Council of the City of St. Helena hereby resolves as follows:

1. The updated City Design and Construction Standards are approved; and

2. Staff shall publish and distribute the updated City Design and Construction Standards in association with construction within the City; and

3. The Public Works Director/City Engineer is authorized to modify the City Design and Construction Standards to reflect changes in best practices, products and construction means and methods.

Approved at a Regular Meeting of the St. Helena City Council on November 25, 2025, by the following vote:

Mayor Dohring: __________
Vice Mayor Deasy: __________
Council Member Barak: __________
Council Member Spadarotto: __________
Council Member Summers: __________
Agenda Item #10.8.

Page 232 of 383 ends

APPROVED: ATTEST:
________________________ ________________________
Paul Jamison Dohring, Mayor Andrew Bradley, City Clerk
Agenda Item #10.8.

Page 233 of 383 ends
Page 234 of 383 ends

Agenda Report to the City Council
Agenda Section: CONSENT ITEMS
Department: Public Works
DATE: November 25, 2025
FROM: Jose Calderon, Engineering Technician II, Mario Traverso, Project Manager
SUBJECT: Consider and adopt a Resolution updating the City of St.

Helena Design and Construction Standards

RECOMMENDED
ACTION:

Approve the resolution.

PREVIOUS COUNCIL
ACTION:
6/22/1993 Resolution No. 93-58 - Adoption of Water and
Sewer Technical Standards
11/23/1993 Resolution No. 93-134 - Adoption of Streets, Storm and Sidewalk Technical Standards
6/23/1998 Resolution No. 98-57 - Revision of Streets,
Storm and Sidewalk Standards
11/27/2015 Resolution No. 2015-132 - Revision of Trench Standards

STATEMENT OF THE
PURPOSE:

The purpose of this action is to approve an update to the City of St. Helena Design and Construction Standards.

FINANCIAL IMPACT: None
BACKGROUND:

The City Design and Construction Standards are a collection of graphical exhibits and instructions which define the means, methods, configurations and products to be used by contractors who perform work within the City Right-of-Way and on City infrastructure.

All contractors performing work within the City are required to adhere to these standards to ensure consistency, safety, and quality of the public infrastructure. The Design and Construction Standards specify a wide variety of public infrastructure ranging from the widths of streets and sidewalks to detailed instructions regarding the installation of water pipelines.

The current collection of Design and Construction Standards were developed and approved in 1993 and 1998 with revisions in 2015. The Standards are due to be updated to reflect updates in products, materials, methods and construction practices.

In 2019, Staff initiated an update to its existing City Design and Construction Standards.

DISCUSSION:

The 2019 update effort stalled for a variety of reasons and in 2024 Staff reinitiated the update effort. City Engineering and Operations Staff conducted a comprehensive review of the City’s Design and Construction Standards. The review and update to the standards has been completed, which have been modified to reflect current industry Agenda Item #10.8.

Page 235 of 383 ends

practices, updated materials, configurations and construction methods. The table of contents of the updated standards and an example of an updated standard is found in Attachment 1.

There are two major categories of content which has been updated. The first are updates that include revisions to products and materials which now align with technological and industry advances. This includes items such as pipe materials, pipe systems, concrete and asphalt concrete mix designs, materials, and safety devices.

The second are updates that include revisions to design standards and methods. This includes items such as pedestrian facilities, roadway striping, trenching methods and surface restoration, utility layouts and separations, inspection and disinfection procedures. These updates are essential to ensure the continued safety, reliability, and efficiency of the City's public infrastructure.

The updated standards are posted on the City's website and can be viewed at https://cityofsthelena.gov/921/7636/Public-WorksStandards?activeLiveTab=widgets.Upon approval by the City Council, the City will officially transition to distribution and use of the updated City Standards.

ENVIRONMENTAL REVIEW: None
GOAL:

Goal 2: Improve Infrastructure & Further Environmental Sustainability Goal 3: Pursue Water Security & Sustainable Management of Water Resources Goal 5: Enhance Quality of Life
Goal 8: Implement Capital Improvement Plans (CIP) Projects Miscellaneous/Other DOCUMENTS ATTACHMENTS:

Attachment 1 - Table of Contents and Example
Attachment 2 - Resolution
Agenda Item #10.8.

Page 236 of 383 ends

CITY OF ST. HELENA

STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS
ADOPTED NOVEMBER 25, 2025
Agenda Item #10.8.

Page 237 of 383 ends

TABLE OF CONTENTS
WATER
101 WATER MAIN CONSTRUCTION NOTES
101A WATER MAIN CONSTRUCTION NOTES CONTINUED
102 FIRE HYDRANT INSTALLATION
102A FIRE HYDRANT LOCATION
102B FIRE HYDRANT MARKER LOCATION
103 1" WATER SERVICE
103A 2" WATER SERVICE
103B 2” MANIFOLD MUTILPLE SERVICES
103C 2” MANIFOLD MUTILPLE SERVICES NOTES
103D 4” DUCTILE IRON MANIFOLD MULTI – SERVICES
103E 4” DUCTILE IRON MANIFOLD MUTIPLE SERVICES NOTES
104 4” WATER SERVICE FOR 3” METER
104A 4” WATER SERVICE FOR 3” METER NOTES AND PARTS LIST 104B 4” WATER SERVICE FOR 4” METER
104C 4” WATER SERVICE FOR 4” METER NOTES AND PARTS LIST 104D 6” WATER SRRVICE FOR 6” METER
104E 6” WATER SERVICE FOR 6” METER NOTES AND PARTS LIST 106 ¾” THRU 4” REDUCED PRESSURE PRINCIPAL BACKFLOW ASSEMBLY 106A 4” THRU 10” DOUBLE DETECTOR FIRE LINE BACKFLOW ASSEMBLY 106B 4” THRU 10” DOUBLE DETECTOR FIRE LINE BACKFLOW ASSEMBLY NOTES 108 TAPPING SADDLE 4” AND OVER
108A TAPPING SADDLE 4” AND OVER
109 COMBINATION FIRE & DOMESTIC SERVICE MASTER METER ASSEMBLY 109A COMBINATION FIRE & DOMESTIC SERVICE MASTER METER ASSEMBLY NOTES 110 COMBINATION SERVICE STUB COMMERCIAL & MULTI-RESIDENTIAL 110A COMBINATION SERVICE STUB COMMERCIAL & MULTI-RESIDENTIAL 111 GATE VALVE, STEM EXTENSION AND BOX WITH RISER
111A VALVE STEM EXTENSION ASSEMBLY
111B BUTTERFLY VALVE INSTALLATION
111C VALVE, ANCHOR, TIE DOWN
112 6” AND 8” BLOW-OFF
112A END OF LINE DETAIL BLOW-OFF APPLICATION
112B TEMPORARY BLOWOFF AND/OR METERED CONNECTION – MAINS UNDER

CONSTRUCTION
112C TIE DOWN CONNECTION AND PIPE CONNECTIONS
112D TYPICAL SYSTEM RESTRAINT LENGTHS
Agenda Item #10.8.

Page 238 of 383 ends

113 WATER SAMPLING STATION
115 CONCRETE ANCHOR BLOCKS: VERTICAL AND COMBINATION BEND

APPLICATIONS
115A CONCRETE THRUST BLOCKS: HORIZONTAL APPLICATIONS
115B CONCRETE THRUST BLOCKS: HORIZONTAL APPLICATIONS NOTES 116 HARNESS INSTALLATION FOR FLANGE FITTINGS
117 WATER MAIN UNDER STRUCTURE LOWERING
118 WATERMAIN OVER STRUCTURE
122 WATER MAIN AND MAIN LINE VALVE ALIGNMENT
123 BORE, AND JACK CASING, SPACER AND END SEAL
127 PRESSURE REDUCING VALVE
127A SURGE ANTICIPATOR VALVE OR PRESSURE RELIEF VALVE NOTES 127B SURGE ANTICIPATIOR VALVE
128 AIR AND VACUUM / AIR RELEASE VALVE
128A 1” MANUAL AIR RELEASE VALVE CONNECTION
129 WATER SEPARATION REQUIREMENTS
129A PIPE TO PIPE CROSSING REQUIREMENTS
129B PIPE TO PIPE CROSSING REQUIREMENTS NOTES
130 EXTERIOR REDUCED PRESSURE BACKFLOW DEVICE INSTALLATION FOR 3” TO 8”

WATER SERVICES

SANITARY SEWER
201 48” PRECAST MANHOLE SANITARY SEWER
202 60” PRECAST MANHOLE SANITARY SEWER
203 INSIDE DROP IN SANITARY SEWER MANHOLE
207 ABANDON PIPE PLUG DETAIL
208 ABANDON MANHOLE / VAULT
209 PRECAST CONCRETE MANHOLES REDUCER SLAB
210 STANDARD MANHOLE FRAME AND COVER
211 SEWER SERVICE LATERAL
211A BACKWATER CHECK VALVE INSTALLATION
212 SEWER SERVICE LATERAL CROSSING DETAILS
213 PIPE STRUCTURE CROSSING DETAILS
214 PLASTIC SEWER PIPE DEFLECTION MANDREL
215 PRECAST GREASE INTERCEPTOR
219 CLEANOUT DETAIL AT BUILDING
220 TYPICAL SERVICE CONNECTION DETAILS
221 SEWAGE BACKEATER VALVE ASSEMBLY
222 SEWER SEPARATION REQUIREMENTS
223 PIPE STRUCTURE CROSSING
Agenda Item #10.8.

Page 239 of 383 ends

STREETS
301 STANDARD HALF STREET SECTIONS
302 STRUCTURAL DESIGN CHART FOR FLEXIBLE PAVEMENTS
303 TRAFFIC CHART FOR FLEXIBLE PAVEMENTS
304 TYPICAL CUL-DE-SACS
305 STANDARD STREET KNUCKLE RESIDENTIAL & MINOR STREETS 306 HAMMERHEAD TURN AROUND RESIDENTIAL PRIVATE STREETS AND ACCESS WAYS
307 EMERGENCY VEHICLE TURNOUT
308 SIDE STREET, END OF OVERLAY AND LIP OF GUTTER CONFORM 310 STANDARD CURB AND GUTTER
313 STANDARD P.C.C. CROSS GUTTER
314 STANDARD DRIVEWAY APPROACH
314A STANDARD DRIVEWAY APPROACH DETACHED SIDEWALK
316 STANDARD CURB RETURN CURB GUTTER & SIDEWALK
316A STANDARD DETAILS SIDEWALK SECTIONS
317 ADA CURB RAMPS
319 TYPICAL SIDEWALK OBSTRUCTION TRANSITION
320 STREET WIDENING / PAVEOUT DETAIL
324 VISIBILITY AND FENCING REQUIREMENTS
325 REMOVABLE TRAFFIC BOLLARD DETAIL
326 STANDARD PERMENANT MONUMENT
327 TYPICAL METHODS FOR SETTING APPURTENANCES
328 STANDARD BARRICADE
328A SIDEWALK BARRICADE
329 STANDARD WOODS TYPE GUAD RAIL
331A STREET NAME SIGN INSTALLATION
331B STREET NAME SIGN INSTALLATION PRIVATE STREETS
332 STANDARD STREET SIGN
333 ADDRESS PAINTING ON CURB FACE
334A STANDARD RESIDENTIAL STREET LIGHT
334B STANDARD RESIDENTIAL STREET LICHT
334C STANDARD RESIDENTIAL STREET LIGHT
335 PAVEMENT MARKINGS
336A TRAFFIC CONTROL REQUIREMENTS

EARTHWORK
400 STANDARD TRENCH DETAILS
400A STANDARD BACKFILL DETAILS
Agenda Item #10.8.

Page 240 of 383 ends

STORMWATER
500 EROSION CONTROL
501 SIDEWALK UNDERDRAIN STORM DRAIN
502 48” CONCRETE MANHOLE STORM DRAIN UNDER 7’
502A 60” CONCRETE MANHOLE STORM DRAIN OVER 7’
503 STORM DRAIN PRESSURE MANHOLES – CONCRETE COLLARS
504 PRECAST CONCRETE MANHOLE REDUCER SLAB
507 SPECIAL APRONS FOR CATCH BASINS
508 CONCRETE V DITCH
509 CURB OPENING CATCH BASIN
509A MODIFICATIONS OF EXISTING CATCH BASIN TO ACCOMIDATE NEW CURB RAMP 510 PRECAST CATCH BASIN COVER STORM DRAIN
510A CATCH BASIN AND DROP INCLET NOTES
511 CATCH BASIN STANDARD TYPE “E”
511A TYPE “E” CATCH BASIN DETAIL
511B STORM DRAIN TYPE “A” CATCH BASIN OVER C.I.P.P.
511C STORM DRAIN MANHOLE OVER C.I.P.P.
512 STROM DRAIN GALLERY
513 STORM DRAIN INLET
513B FIELD DRAIN
514 STORM DRAIN LABELS
515 TYPICAL BIO-RETENTION UNIT 1
515A TYPICAL BIO-RETENTION UNIT 2
Agenda Item #10.8.

Page 241 of 383 ends

)> (') 0
""O :c ;o
""O ?.- )>
c§ ~
z
~ ~ C>
(/)
" 0 (/} ~
CD
)> ::::0
Orr,
AO
-,, C
ro
0 rr,
:E 0
""D -u
::::0 ::;o
rr, rr,
< (/) rr, (/) Zc
~ ::;o
Sci rr,
~ (/)
0 cf
m z
0 ;o
(/) fT1
() ~ )> ..... r
p:1 .....
..... z -.....J
0 I
z lO
fT1 .i,..
)>
""O
;o
0 ~
0 )>
~
"Tl
rr,
OJ
__.
lO
lO
vi
UNION
PIPING.VALVES, NIPPLES, ETC. SHALL~

BE THREADED BRASS OR GALVANIZED
FOR SIZES 2• OR LESS, AND SHALL BE

FLANGED DUCTILE IRON FOR

REDUCED PRESSURE BACKFLOW PREVENTION DEVICE
WATTS NO. 909, FEBCO SERIES 825Y, 825,
OR APPROVED EQUAL.

UNION
3• OR GREATER. r...--TEE WITH
METER AND VAUL~~
SEE STD. 102 OR •:~---'
tc::~;Tc11===============-:-!----
1-----J I \ I
I I \ I
I I \ I
If 'I
s·
I I i-==-===-i I I I I 7}--_......____ --~,
I I
I I
i.J
NOTES:

BRASS OR

COPPER LINE

1. REDUCED PRESSURE TYPE BLACKFLOW PREVENTION DEVICES

SHALL BE REQUIRED FOR ANY USE WHERE TOXIC MATERIALS

ARE USED OR WHERE POSITIVE PROTECTION FOR THE PUBLIC
WATER SUPPLY IS REQUIRED. TYPICAL APPLICATIONS INCLUDE:

IRRIGATION SERVICES, COMMERCIAL SERVICES, INDUSTRIAL SERVICES,

HOSPITALS, LABORATORIES, MORTUARIES, OR AS DETERMINED
BY THE CITY ENGINEER. (TITLE 17 CAL. ADMINISTRATION CODE)

2. APPROVED REDUCED PRESSURE TYPE BACKFLOW PREVENTION

DEVICES SHALL BE AS LISTED BY THE UNIVERSITY OF
SOUTHERN CALIFORNIA STUDY, LA TEST REVISION.
. .
1• PLUG
s• ABOVE INUNDATION
LEVEL OR 12• MIN.
• • • • A •
. . · . ..
3• THICK P.C.C. PAD
MIN. 2•-0• WIDE
- CONCRETE THRUST BLOCK----

NOT SHOWN - THRUST

BLOCK NOT REQUIRED
FOR 2• OR SMALLER

CONNECT TO
SYSTEM

3. BACKFLOW PREVENTION DEVICES SHALL BE INSTALLED

ADJACENT TO AND ON THE PROPERTY SIDE OF SIDEWALK
WHERE APPLICABLE. THE ASSEMBLY SHALL BE INSTALLED AS
CLOSE TO THE WATER METER LOCATION AS PRACTICAL.

4. DEVICE TO BE SAME SIZE OR LARGER THAN SERVICE METER.

5. LANDSCAPING OR OTHER SCREENING AROUND THE BACKFLOW

DEVICE SHALL BE AS SHOWN ON IMPROVEMENT PLANS, AS
APPROVED BY THE CITY ENGINEER.

Agenda Item #10.8.

Page 242 of 383 ends

12" MIN. ABOVE FINISHED

GRADE OR INUNDATION
LEVEL OR 24" MAXIMUM.
4" THICK CONCRETE
PAD MIN. 2'-0" WIDE
FOR 2" DIA. DEVICE
& LARGER.

NOTES:

1. SEE WATER SYSTEM DESIGN GUIDELINES.

2. REDUCED PRESSURE BACKFLOW ASSEMBLIES SHALL BE

REQUIRED FOR ALL NEW DOMESTIC SERVICES AND ANY

USE WHERE TOXIC MATERIALS ARE USED OR WHERE

POSITIVE PROTECTION OF THE PUBLIC WATER SUPPLY IS
REQUIRED. TYPICAL APPLICATIONS INCLUDE, ALL

INDUSTRIAL AND IRRIGATION SERVICES, PARKS,

HOSPITALS, MEDICAL AND DENTAL LABORATORIES,

MORTUARIES, INDUSTRIAL PLANTS AND DRY CLEANERS
OR AS DETERMINED BY THE CITY ENGINEER.

3. REDUCED PRESSURE BACKFLOW ASSEMBLIES SHALL BE

INSTALLED ADJACENT TO AND ON THE PROPERTY SIDE OF
SIDEWALK WHERE APPLICABLE. WHERE NO SIDEWALK

EXISTS, THE REDUCED PRESSURE BACKFLOW ASSEMBLY

SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO THE
WATER METER LOCATION. THERE SHALL BE NO TEE OR

BRANCH LINES BETWEEN THE WATER METER AND
ASSEMBLY LOCATION. ANY CONFLICTS SHALL BE

RESOLVED BY CONTRACTOR TO THE CITY ENGINEER'S
APPROVAL.

4. APPROVED REDUCED PRESSURE BACKFLOW ASSEMBLIES
SHALL BE AS SHOWN ON "LIST OF APPROVED BACKFLOW
PREVENTION ASSEMBLIES" (LATEST REVISION) BY THE

STATE OF CALIFORNIA WATER RESOURCE CONTROL

BOARD, DIVISION OF DRINKING WATER, INFORMATION FOR

PUBLIC DRINKING WATER SYSTEMS

5. ALL REDUCED PRESSURE BACKFLOW ASSEMBLIES SHALL
BE PROVIDED WITH A MINIMUM OF FOUR (4) TEST COCKS.

AND TWO (2) SHUT OFF VALVES.

6. THE PIPING FROM THE METER AND THE REDUCED

PRESSURE BACKFLOW ASSEMBLY ITSELF, MUST BE THE

SAME SIZE AS THE METER UNLESS OTHERWISE APPROVED
BY THE CITY ENGINEER.

7. FOR 2" PIPE DIAMETER OR LESS, A 12" LONG MINIMUM
BRASS NIPPLE OR TYPE " L " HARD TEMPER COPPER PIPE
IS REQUIRED AT BOTH UNDERGROUND ELBOWS.

8. A THERMAL EXPANSION TANK WHEN USED ON A DOMESTIC

SERVICE SHALL BE SIZED AND INSTALLED PER

MANUFACTURES RECOMMENDATION ON THE COLD WATER
SUPPLY LINE TO THE WATER HEATER.

9. AN ENCLOSURE IS RECOMMENDED FOR PROTECTION
FROM FREEZING AND VANDALISM.

10. SHUT OFF VALVES:

10.1. 3" AND LESS SHALL BE BALL VALVE

10.2. 4" AND GREATER SHALL BE RESILIENT SEAT GATE
VALVE.

11. ALL PIPING, VALVES, NIPPLES, ETC. SHALL BE THREADED BRASS.

11.1. 3" AND LESS SHALL BE TYPE "L" HARD-TEMPER
COPPER.

11.2. 4" AND GREATER SHALL BE FLANGED DUCTILE IRON.

12. PVC PIPE OR FITTINGS SHALL NOT BE USED.

13. IF PROPOSING TO INSTALL THIS DEVICE IN A FLOOD ZONE, CONTACT THE CITY ENGINEER FOR APPROVAL.

14. REDUCE PRESSURE BACKFLOW DEVICE MANUFACTURE
FROM APPROVED MATERIALS LIST.

REDUCED PRESSURE VALVE, TYP. SEE NOTES 2 & 3. CHECK VALVES.

TEST COCK, TYP. SEE NOTE 5.

SEE NOTE 12.

ENCLOSURE,
SEE NOTE 9.

SIDEWALK

METER COUPLING
OR FLANGE REQUIRED.

METER AND BOX
PER CITY STD.

NIPPLE 12" MIN.

SEE NOTE 7.

CONCRETE THRUST BLOCKS
SEE CITY STD 115 (4" AND LARGER ONLY).

BUILDING SERVICE
NIPPLE 12" MIN.

SEE NOTE 7.

SHUT OFF VALVE TYP SEE NOTES 5
& 10
DRAWN:

SCALE:

CHK:

APPVD:

DATE:

STD. NO.

APPROVED BY:

JOSEPH LEACH, P.E.

JL PUBLIC WORKS DIRECTOR MT 106
3 4" THRU 4"

REDUCED PRESSURE PRINCIPLE

BACKFLOW ASSEMBLY
PL
NONE JAN 2025
Agenda Item #10.8.

Page 243 of 383 ends
Page 244 of 383 ends

CITY OF ST. HELENA
RESOLUTION NO. 2025 -

A RESOLUTION ADOPTING UPDATED CITY DESIGN

AND CONSTRUCTION STANDARDS

RECITALS
A. Construction in the City occurs on a regular basis; and B. Design and Construction Standards promote consistency and prescribe expectations concerning the maintenance and improvement of City infrastructure; and C. The current City Design and Construction Standards were developed and adopted in 1993 and 1998 and last updated in 2015; and
D. The Design and Construction Standards have been updated to incorporate local, state and federal best practices; and
E. The Design and Construction Standards will continue to be updated to incorporate changes in best practices, products, construction means and methods: and F. The Design and Construction Standards will be kept on file at City Hall, available on the City’s website and distributed in association with construction within the City.

RESOLUTION
The City Council of the City of St. Helena hereby resolves as follows:

1. The updated City Design and Construction Standards are approved; and

2. Staff shall publish and distribute the updated City Design and Construction Standards in association with construction within the City; and

3. The Public Works Director/City Engineer is authorized to modify the City Design and Construction Standards to reflect changes in best practices, products and construction means and methods.

Approved at a Regular Meeting of the St. Helena City Council on November 25, 2025, by the following vote:

Mayor Dohring: __________
Vice Mayor Deasy: __________
Council Member Barak: __________
Council Member Spadarotto: __________
Council Member Summers: __________
Agenda Item #10.8.

Page 245 of 383 ends

APPROVED: ATTEST:
________________________ ________________________
Paul Jamison Dohring, Mayor Andrew Bradley, City Clerk
Agenda Item #10.8.

Page 246 of 383 ends

Agenda Report to the City Council
Agenda Section: CONSENT ITEMS
Department: Public Works
DATE: November 25, 2025
FROM: Stephanie Killingsworth, Public Works Financial Analyst SUBJECT: Consideration and Proposed Adoption of a Resolution Authorizing a Budget Amendment to Appropriate Water
Enterprise Fund Balance for the Stonebridge Well Filter Media Replacement with ERS Industrial Services, Inc.
increasing appropriations by $190,590 using Water
Enterprise Fund Balance.

RECOMMENDED
ACTION:

Staff recommends approval of the attached Resolution.

PREVIOUS COUNCIL
ACTION:

Resolution 2025-111 - City Council approved a
Construction Contract with ERS Industrial Services, Inc. with an authorized total project budget of $190,590 to be paid with FY2025/26 Water Enterprise Operating Budget.

STATEMENT OF THE
PURPOSE:

This item seeks City Councils approval of a budget
amendment only. During implementation, staff determined that sufficient appropriations were not available within the FY25/26 Water Enterprise Operating Budget to support the approved Project. Therefore, City Council authorization is required to appropriate use of Water Enterprise Fund
Balance to fund the project.

FINANCIAL IMPACT: The previously approved project cost of $190,590 was not included in the adopted FY25/26 Water Enterprise Fund
Operating Budget. The prior staff report anticipated that a mid-year budget adjustment may be required to maintain
adequate operational capacity.

Upon further review, staff has determined that no
appropriated funds are currently available within the
current Operating Budget to support this project. As a
result, a budget adjustment is required now, rather than at mid-year, to ensure the project can proceed.

Staff recommends increasing appropriations for 561-5034- 2670 by $190,590 using Water Enterprise Fund Balance.

This action will ensure that sufficient funding is available while maintaining continuity of operations.

BACKGROUND:

Agenda Item #10.9.

Page 247 of 383 ends

The Stonebridge Wells play a critical role in supplementing the City's water supply during high-demand months. In recent years, the City has received periodic customer complaints related to discoloration and aesthetic quality of water, which can partially be attributed to this site. Although the water remains safe and compliant with regulatory standards, staff has been actively working with consultants and treatment specialists to identify operational improvements.

An evaluation of the Stonebridge Well Filter System determined that the filter media, which is responsible for removing naturally occurring constituents such as iron and manganese, has reached the end of its useful life and is no longer performing efficiently.

Replacing the media is necessary to maintain water quality and system reliability.

As part of the City's ongoing efforts to address seasonal water quality issues, staff had an evaluation performed on the condition of the filter media at the Stonebridge Wells.

The existing media has been in place for several years and has shown signs of reduced effectiveness in removing iron, manganese, and other naturally occurring constituents that can contribute to water discoloration, taste, and odor concerns.

ERS Industrial Services, Inc., a specialized environmental remediation contractor, has provided a proposal to remove and replace the aging filter media with new, higherperformance material that is expected to enhance treatment efficiency and improve water quality. The scope of work includes removal and disposal of the existing media, cleaning and inspection of the vessels, supply and installation of a new filter gravel, greensand, provided a proposal to remove and replace the aging filter media with new, higher-performance material that is expected to enhance treatment efficiency and improve water quality. The scope of work includes removal and disposal of the existing media, cleaning and inspection of the vessels, supply and installation of a new filter gravel, greensand, and anthracite, and testing to ensure system optimization following installation.

DISCUSSION:

On September 23, 2025 the City Council approved a Construction Contract with ERS Industrial Services, Inc. for replacement of the media requiring a total budget of $190.590. The scope of work includes removal and disposal of existing media, vessel cleaning and inspection, installation of new filter gravel, greensand, and anthracite, and post-installation testing. The contract terms and scope remain unchanged.

The initial approval assumed that sufficient appropriations were in place within the FY2025/26 Water Enterprise Operating Budget, subject to a possible mid-year budget adjustment. However, during implementation, staff confirmed that current-year operating appropriations cannot support this cost, and the fund does not contain available savings or unused capacity to absorb the expense.

Although the current FY25/26 Water Enterprise Fund Operating Budget does not have adequate appropriated funds, the fund does have sufficient Fund Balance to complete Agenda Item #10.9.

Page 248 of 383 ends

this one-time expense. To proceed with the project, an immediate budget amendment is necessary. This action allows the project to move forward immediately and removes a fiscal constraint identified after the original approval.

ENVIRONMENTAL REVIEW: The project is exempt from CEQA under Section 15301, Class 1 (Existing Facilities), as it involves repair and maintenance of existing public utility systems without expansion of capacity or use.

GOAL:

Goal 2: Improve Infrastructure & Further Environmental Sustainability Goal 3: Pursue Water Security & Sustainable Management of Water Resources DOCUMENTS ATTACHMENTS:

Resolution ERS Funding Amendment
Agenda Item #10.9.

Page 249 of 383 ends

CITY OF ST. HELENA
RESOLUTION NO. 2025-__

RESOLUTION AUTHORIZING A BUDGET AMENDMENT TO

APPROPRIATE WATER ENTERPRISE FUND BALANCE FOR THE

STONEBRIDGE WELL FILTER MEDIA REPLACEMENT WITH ERS
INDUSTRIAL SERVICES, INC.

RECITALS
A. The City Council previously approved a Construction Contract with ERS Industrial Services, Inc. on September 23, 2025 via Resolution 2021-111, authorizing a total project budget of $190,590 for the Stonebridge Well Filter Media Replacement Project; and
B. The initial approval assumed that sufficient appropriations were in place within the FY2025/2 Water Enterprise Operating Budget, with the possibility that a midyear budget adjustment might later be required ; and C. Upon further review during implementation, staff has determined that no appropriated funds are available within the FY2025/26 Water Enterprise Operating Budget to cover the previously approved project costs; and D. The Water Enterprise Fund has adequate Fund Balance available to fully support this one-time project expense without affecting ongoing operational needs or regulatory requirements; and
E. A budget amendment is required now rather than mid-year, to appropriate the necessary funds and allow the project to proceed as previously authorized.

RESOLUTION
NOW, THEREFORE, the City Council of the City of St. Helena resolves as follows:

1. Authorizes a budget amendment to increase appropriations in the Water Enterprise Operating Budget, by $190,590 for the Stonebridge Well Filter Media Replacement.

2. The City Council authorizes the use of Water Enterprise Fund Balance as the funding source for this appropriation.

Agenda Item #10.9.

Page 250 of 383 ends

3. Funding is as follows:

Description Fund/Funding
Source
Expense
GL Account
Amount
Increase to Budget
Capital Improvement
Equipment
561 – Water
Enterprise Fund 561-5034-2670 $190,590
Approved at a Regular Meeting of the St. Helena City Council on November 25, 2025, by the following vote:

Mayor Dohring:

Vice Mayor Deasy:

Council Member Barak:

Council Member Spadarotto:

Council Member Summers:

APPROVED: ATTEST:
________________________ ________________________
Paul Jamison Dohring, Mayor Andrew Bradley, City Clerk
Agenda Item #10.9.

Page 251 of 383 ends
Page 252 of 383 ends

Agenda Report to the City Council
Agenda Section: CONSENT ITEMS
Department: Public Works
DATE: November 25, 2025
FROM: Stephanie Killingsworth, Public Works Financial Analyst SUBJECT: Consideration and Proposed Adoption of a Resolution Authorizing a Budget Amendment to Appropriate Water
Enterprise Fund Balance for the Stonebridge Well Filter Media Replacement with ERS Industrial Services, Inc.
increasing appropriations by $190,590 using Water
Enterprise Fund Balance.

RECOMMENDED
ACTION:

Staff recommends approval of the attached Resolution.

PREVIOUS COUNCIL
ACTION:

Resolution 2025-111 - City Council approved a
Construction Contract with ERS Industrial Services, Inc. with an authorized total project budget of $190,590 to be paid with FY2025/26 Water Enterprise Operating Budget.

STATEMENT OF THE
PURPOSE:

This item seeks City Councils approval of a budget
amendment only. During implementation, staff determined that sufficient appropriations were not available within the FY25/26 Water Enterprise Operating Budget to support the approved Project. Therefore, City Council authorization is required to appropriate use of Water Enterprise Fund
Balance to fund the project.

FINANCIAL IMPACT: The previously approved project cost of $190,590 was not included in the adopted FY25/26 Water Enterprise Fund
Operating Budget. The prior staff report anticipated that a mid-year budget adjustment may be required to maintain
adequate operational capacity.

Upon further review, staff has determined that no
appropriated funds are currently available within the
current Operating Budget to support this project. As a
result, a budget adjustment is required now, rather than at mid-year, to ensure the project can proceed.

Staff recommends increasing appropriations for 561-5034- 2670 by $190,590 using Water Enterprise Fund Balance.

This action will ensure that sufficient funding is available while maintaining continuity of operations.

BACKGROUND:

Agenda Item #10.9.

Page 253 of 383 ends

The Stonebridge Wells play a critical role in supplementing the City's water supply during high-demand months. In recent years, the City has received periodic customer complaints related to discoloration and aesthetic quality of water, which can partially be attributed to this site. Although the water remains safe and compliant with regulatory standards, staff has been actively working with consultants and treatment specialists to identify operational improvements.

An evaluation of the Stonebridge Well Filter System determined that the filter media, which is responsible for removing naturally occurring constituents such as iron and manganese, has reached the end of its useful life and is no longer performing efficiently.

Replacing the media is necessary to maintain water quality and system reliability.

As part of the City's ongoing efforts to address seasonal water quality issues, staff had an evaluation performed on the condition of the filter media at the Stonebridge Wells.

The existing media has been in place for several years and has shown signs of reduced effectiveness in removing iron, manganese, and other naturally occurring constituents that can contribute to water discoloration, taste, and odor concerns.

ERS Industrial Services, Inc., a specialized environmental remediation contractor, has provided a proposal to remove and replace the aging filter media with new, higherperformance material that is expected to enhance treatment efficiency and improve water quality. The scope of work includes removal and disposal of the existing media, cleaning and inspection of the vessels, supply and installation of a new filter gravel, greensand, provided a proposal to remove and replace the aging filter media with new, higher-performance material that is expected to enhance treatment efficiency and improve water quality. The scope of work includes removal and disposal of the existing media, cleaning and inspection of the vessels, supply and installation of a new filter gravel, greensand, and anthracite, and testing to ensure system optimization following installation.

DISCUSSION:

On September 23, 2025 the City Council approved a Construction Contract with ERS Industrial Services, Inc. for replacement of the media requiring a total budget of $190.590. The scope of work includes removal and disposal of existing media, vessel cleaning and inspection, installation of new filter gravel, greensand, and anthracite, and post-installation testing. The contract terms and scope remain unchanged.

The initial approval assumed that sufficient appropriations were in place within the FY2025/26 Water Enterprise Operating Budget, subject to a possible mid-year budget adjustment. However, during implementation, staff confirmed that current-year operating appropriations cannot support this cost, and the fund does not contain available savings or unused capacity to absorb the expense.

Although the current FY25/26 Water Enterprise Fund Operating Budget does not have adequate appropriated funds, the fund does have sufficient Fund Balance to complete Agenda Item #10.9.

Page 254 of 383 ends

this one-time expense. To proceed with the project, an immediate budget amendment is necessary. This action allows the project to move forward immediately and removes a fiscal constraint identified after the original approval.

ENVIRONMENTAL REVIEW: The project is exempt from CEQA under Section 15301, Class 1 (Existing Facilities), as it involves repair and maintenance of existing public utility systems without expansion of capacity or use.

GOAL:

Goal 2: Improve Infrastructure & Further Environmental Sustainability Goal 3: Pursue Water Security & Sustainable Management of Water Resources DOCUMENTS ATTACHMENTS:

Resolution ERS Funding Amendment
Agenda Item #10.9.

Page 255 of 383 ends
Page 256 of 383 ends

CITY OF ST. HELENA
RESOLUTION NO. 2025-__

RESOLUTION AUTHORIZING A BUDGET AMENDMENT TO

APPROPRIATE WATER ENTERPRISE FUND BALANCE FOR THE

STONEBRIDGE WELL FILTER MEDIA REPLACEMENT WITH ERS
INDUSTRIAL SERVICES, INC.

RECITALS
A. The City Council previously approved a Construction Contract with ERS Industrial Services, Inc. on September 23, 2025 via Resolution 2021-111, authorizing a total project budget of $190,590 for the Stonebridge Well Filter Media Replacement Project; and
B. The initial approval assumed that sufficient appropriations were in place within the FY2025/2 Water Enterprise Operating Budget, with the possibility that a midyear budget adjustment might later be required ; and C. Upon further review during implementation, staff has determined that no appropriated funds are available within the FY2025/26 Water Enterprise Operating Budget to cover the previously approved project costs; and D. The Water Enterprise Fund has adequate Fund Balance available to fully support this one-time project expense without affecting ongoing operational needs or regulatory requirements; and
E. A budget amendment is required now rather than mid-year, to appropriate the necessary funds and allow the project to proceed as previously authorized.

RESOLUTION
NOW, THEREFORE, the City Council of the City of St. Helena resolves as follows:

1. Authorizes a budget amendment to increase appropriations in the Water Enterprise Operating Budget, by $190,590 for the Stonebridge Well Filter Media Replacement.

2. The City Council authorizes the use of Water Enterprise Fund Balance as the funding source for this appropriation.

Agenda Item #10.9.

Page 257 of 383 ends

3. Funding is as follows:

Description Fund/Funding
Source
Expense
GL Account
Amount
Increase to Budget
Capital Improvement
Equipment
561 – Water
Enterprise Fund 561-5034-2670 $190,590
Approved at a Regular Meeting of the St. Helena City Council on November 25, 2025, by the following vote:

Mayor Dohring:

Vice Mayor Deasy:

Council Member Barak:

Council Member Spadarotto:

Council Member Summers:

APPROVED: ATTEST:
________________________ ________________________
Paul Jamison Dohring, Mayor Andrew Bradley, City Clerk
Agenda Item #10.9.

Page 258 of 383 ends

Agenda Report to the City Council
Agenda Section: CONSENT ITEMS
Department: Public Works
DATE: November 25, 2025
FROM: Stephanie Killingsworth, Public Works Financial Analyst SUBJECT: Consideration and Proposal Approval of Resolutions Authorizing (1) Payment to Larry Walker Associates for
Past Wastewater and Groundwater Regulatory Work
Efforts in the amount of $191,209 and Authorizing the
Necessary Budget Amendments; and (2) the City Manager
to Execute a Professional Services Agreement with Larry Walker Associates for a New Scope of Services and
Funding Authorization for Wastewater Regulatory
Assistance through June 30, 2027 for a total not-to-exceed $160,700.

RECOMMENDED
ACTION:

Staff recommends approval of the attached Resolution.

PREVIOUS COUNCIL
ACTION:

February 14, 2017 - Resolution 2017-15
Approval of a Professional Services Agreement in the
amount of $35,100 for groundwater quality monitoring and reporting at the WWTP.

June 13, 2017 - Resolution 2017-77
Approval of a Professional Services Agreement in the
amount of $610,276 for groundwater quality monitoring
and reporting at the WWTP.

November 28, 2017 - Resolution 2017-154
Approval of Amendment No. 1 to the Professional Services Agreement for an amount of $25,000.

August 14, 2018 - Resolution 2018-018
Approval of a Professional Services Agreement in the
amount of $47,838 to provide Regulatory Assistance for
the WWTP.

November 9, 2021 - Resolution 2021-140
Approval of a Professional Services Agreement in the
amount of $65,371 to provide Regulatory Assistance for
the WWTP.

STATEMENT OF THE
PURPOSE:

Obtain City Council authorization to (1) cover past
regulatory compliance work completed by Larry Walker
Associates (LWA) under expired agreements and
authorize the necessary budget amendments, and (2)
execution of a new Professional Services Agreement
(PSA) with LWA to continue essential wastewater and
Agenda Item #10.10.

Page 259 of 383 ends

groundwater regulatory services through June 30, 2027.

FINANCIAL IMPACT: Past Work
Payment for the past regulatory work completed by Larry Walker Associates in the amount of $191,209 is not
appropriated in the FY25-26 Wastewater Enterprise Fund
Operating Budget. Staff recommends using Wastewater
Enterprise Fund Balance to fully fund this outstanding
obligation. These monies include accumulated savings
from prior-year Public Works Administration operating
budgets, which were returned to fund balance at year-end.

New Scope of Services
Funding for the new Professional Services Agreement notto-exceed $160,700 through June 30, 2027 is available within the Public Works Administration operating budget for FY2025-26 and FY2026-27, and no budget adjustment
is required for the new contract at this time.

BACKGROUND:

Larry Walker Associates (LWA) has provided regulatory compliance assistance to the City of St. Helena's Wastewater Treatment and Reclamation Facility WWTP) since 2017. Their work supports the City's compliance with the San Francisco Bay Regional Water Quality Control Board (RWQCB) permits, Water Reclamation Requirements, Sanitary Sewer System Waste Discharge Requirements (WDRs), and various monitoring and reporting mandates.

The City has historically relied on LWA for wastewater regulatory assistance, groundwater monitoring, NPDES compliance reporting, and specialized technical support. Over the past several years, LWA's services have been essential in maintaining the City's compliance with complex and evolving State and regional regulatory requirements.

Past Work
Larry Walker Associates experienced staff turnover and delays in invoicing; however, they continued providing regulatory assistance beyond the expiration of the prior agreement to ensure that the City remained compliant. LWA subsequently submitted four outstanding invoices totaling $191,209.24 (rounded to $191,209 for City Council authorization). LWA's November 13, 2025 cover letter provides itemized past-work totals and a reconciliation of hours, tasks, and deliverables completed.

New Scope of Services
To maintain continuity in regulatory compliance, LWA submitted a new proposed Scope of Services through June 30, 2027, with a total not-to-exceed cost of $160,700. The proposed scope includes ongoing SMRs, pollution prevention reporting, annual reports, Agenda Item #10.10.

Page 260 of 383 ends

groundwater monitoring, mixing zone study updates, assistance with the NPDES permit renewal process, and SSMP updates, among other regulatory requirements.

DISCUSSION:

Past Work Payment Authorization
The past work performed by Larry Walker Associates between February 2023 and October 2025 was necessary to ensure the City remained in compliance. Work performed included:
 Monthly and annual Self-Monitoring Reports (SMRs)
 NPDES permit renewal application support (ROWD)
 Groundwater sampling, lab coordination, and reporting  Pollution Prevention Program compliance
 Regulatory correspondence and technical support
 SSMP audit and update preparation
 Operational assistance during staffing shortages and equipment failures These efforts ensured uninterrupted compliance and prevented potential enforcement actions or penalties. Payment authorization is now requested to reconcile the outstanding balance of $191,209 for these completed services.

New Professional Services Agreement
The City continues to face significant and ongoing wastewater regulatory requirements, including anticipated updates to NPDES permit conditions, groundwater monitoring obligations, and mandatory SSMP updates. LWA's 2025-2027 Scope of Services provides comprehensive technical, regulatory, and reporting support needed to maintain compliance. Key components of the new scope include:
 Preparation of SMRs, annual reports, and compliance certifications  Updates to the Pollution Prevention Program
 Support through the NPDES permit reissuance and ROWD process  Groundwater monitoring, sampling, and analysis
 Mixing zone study coordination and regulatory review
 Technical assistance for emerging regulatory issues and RWQCB directives  SSMP update and recertification before May 2026 deadline The new PSA establishes a not-to-exceed cost of $160,700 through June 30, 2027.

This agreement formalizes ongoing services and ensures adequate technical support for the City's complex regulatory environment.

ENVIRONMENTAL REVIEW: Not a CEQA Project.

GOAL:

Agenda Item #10.10.

Page 261 of 383 ends

Goal 2: Improve Infrastructure & Further Environmental Sustainability Goal 3: Pursue Water Security & Sustainable Management of Water Resources Goal 7: Enhance Organizational Effectiveness
DOCUMENTS ATTACHMENTS:

Resolution A
LWA St Helena Past Work Effort Cover Letter
Resolution B
Larry Walker FY26-27 PSA
Agenda Item #10.10.

Page 262 of 383 ends

CITY OF ST. HELENA
RESOLUTION NO. 2025-__

RESOLUTION AUTHORIZING PAYMENT TO LARRY WALKER

ASSOCIATES FOR PAST WASTEWATER AND GROUNDWATER
REGULATORY WORK EFFORTS IN THE AMOUNT OF $191,209
AND AUTHORIZING THE NECESSARY BUDGET AMENDMENTS.

RECITALS
A. Larry Walker Associates (LWA) has provided regulatory compliance services to ensure the City’s adherence to State and regional wastewater and groundwater regulatory requirements; and
B. LWA continued providing essential regulatory support beyond the expiration of the prior agreement. Due to LWA’s internal staffing turnover and delays in invoicing, the City did not receive timely invoices for work performed between February 2023 and October 2025; and
C. As a result of these delays, the City now has outstanding invoices totaling $191,209 requiring Council authorization for payment; and D. Payment for these past services was not appropriated in the FY2025-26 Wastewater Enterprise Fund Operating Budget; and
E. Sufficient funding is available within the Wastewater Enterprise Fund Balance, including accumulated savings from prior-year Public Works Administration operating budgets that revered to fund balance at year-end; and F. A budget amendment is required to appropriate these funds for payment.

RESOLUTION
NOW, THEREFORE, the City Council of the City of St. Helena resolves as follows:

1. Authorizes payment to Larry Walker Associates in the amount of $191,209 for past wastewater and groundwater regulatory work efforts.

2. Authorizes a budget amendment appropriating $191,209 from the Wastewater Enterprise Fund Balance to the applicable operating expenditure account to fund this payment.

Agenda Item #10.10.

Page 263 of 383 ends

3. Funding is as follows:

Description Fund/Funding
Source
Expense
GL Account
Amount
PW Admin
Professional Contracts
571 – Wastewater
Enterprise 571-5000-2130 $191,209
Approved at a Regular Meeting of the St. Helena City Council on November 25, 2025, by the following vote:

Mayor Dohring:

Vice Mayor Deasy:

Council Member Barak:

Council Member Spadarotto:

Council Member Summers:

APPROVED: ATTEST:
________________________ ________________________
Paul Jamison Dohring, Mayor Andrew Bradley, City Clerk
Agenda Item #10.10.

Page 264 of 383 ends

2246 Sixth Street
Berkeley, CA 94710
510. 883. 9873
[email protected]
www.lwa.com
LARRY WALKER ASSOCIATES 1
WASTEWATER AND GROUNDWATER REGULATORY SERVICES: PROGRESS REPORT AND CONTRACTING November 13, 2025
Joseph Leach
City of St. Helena
1088 College Avenue
St. Helena, CA 95574
[email protected]
Subject: Wastewater and Groundwater Regulatory Services: Progress Report and Contracting Dear Mr. Leach,
Larry Walker Associates (LWA) has been providing regulatory assistance to the City of St. Helena (City) since 2005. Most recently, we have been assisting with wastewater compliance for the City’s wastewater treatment plant (WWTRP) under contract 2022-031 and with groundwater monitoring under P.O. 14117.

In the time since these contracts have started, the LWA management team for the City’s contract has undergone staffing changes. Although the initial contract periods have expired, work continued as LWA was committed to ensure the City continued environmental compliance. Invoices for these services were delayed but are now enclosed for your review. Enclosed, please find four invoices covering work efforts for February 2023 to October 2025 for wastewater regulatory assistance (invoices 00110.24-17 and 00110.24- 18) and for October 2024 to October 2025 for groundwater monitoring and reporting (invoices 00110.19-80 and 00110.19-81). In total, the compensation amount for this past work effort is $191,208.24.

The enclosed invoices include detailed information on personnel, hours, and task descriptions on a monthly basis. The work effort completed has always been at the direction of City staff, and has ensured the City’s compliance with requirements mandated by the Regional and State Water Resources Control Boards.

In the period covered by these work efforts, LWA has assisted the WWTRP team through several staffing transitions, helped staff navigate complex regulatory requirements, prepared monthly and annual selfmonitoring reports for the WWTRP, completed the WWTRP National Pollutant Discharge Elimination System (NPDES) permit renewal application, updated the City’s Sewer System Management Plan, and performed groundwater sampling required by the City’s 2016 Cease and Desist Order.

We appreciate your assistance in this matter. Our efforts have ensured uninterrupted compliance and supported the City through critical regulatory transitions. It has always been a pleasure to work with City of St. Helena staff and support the City’s continued commitment to protecting the environment. We look forward to continuing this work and have completed a proposal and scope of services to continue this assistance through June 30, 2027 (submitted separately).

Please let me know if you have any questions. I can be reached at 415-378-2780 or [email protected].

Sincerely,
Alina Constantinescu, Senior Engineer
Larry Walker Associates, Inc.

Agenda Item #10.10.

Page 265 of 383 ends
Page 1 of 6 ends

009 - Project Management $470.75
008 - Bi-Annual Groundwater Monitoring Report $.00
007 - Interim Groundwater Monitoring Report $5,467.00
006 - Groundwater Fate and Transport Modelling $.00
005 - Review and Compile Analytical Data $359.50
004 - Perform Monitoring $10,521.41
003 - Monitoring Preparation $7,926.40
002 - Prepare a Sampling and Analysis Plan $.00
001 - Development of Monitoring Well Network and Monitoring Well Installation $.00 TOTAL AMOUNT DUE THIS INVOICE $24,745.06

TOTAL PER TASK SUMMARY
City of St. Helena
Attn: Accounts Payable
1088 College Ave.

St. Helena, CA 94574
1480 Drew Avenue, Suite 100
Davis, CA 95618
Please remit payment to
Larry Walker Associates, Inc.

November 10, 2025
Project No. - Invoice No: 00110.19-80
CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Project: 00110.19
PO 14117
For Services Rendered Through 7/31/2025
Agenda Item #10.10.

Page 266 of 383 ends

Project 00110.19 CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Invoice 00110.19-80

Page 2 of 6 ends

Kornegay, Travis Project Level I-C 11.25 150.00 $1,687.50 Diaz Casanueva, Jose Project Level II-B .50 221.00 $110.50 Total Professional Services for 004 $1,798.00
Employee Title Hours Rate Amount
LWA Professional Services
004 - Perform Monitoring
Lee, Brandon Tze-Hung Supplies & Materials Ice 6/2/2025 1.00 15.93 $15.93 Lee, Brandon Tze-Hung Meals Lunch - St.

Helena
11/12/2024 1.00 21.72 $21.72
Total Reimbursable for 003 $37.65
Payee Expense Code Comment Date Qty Unit Rate Amount
Reimbursables
McFadin, Sophie Project Level II-B .25 221.00 $55.25
Lee, Brandon Tze-Hung Project Level I-B 25.50 176.00 $4,488.00 Kornegay, Travis Project Level I-C 16.25 150.00 $2,437.50 Diaz Casanueva, Jose Project Level II-B 3.50 221.00 $773.50 Constantinescu, Alina Senior I .50 269.00 $134.50
Total Professional Services for 003 $7,888.75
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 003 $7,926.40
003 - Monitoring Preparation
City of St. Helena
Attn: Accounts Payable
1088 College Ave.

St. Helena, CA 94574
CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Project: 00110.19
PO 14117
For Services Rendered Through 7/31/2025
November 10, 2025
Project No. - Invoice No: 00110.19-80
Agenda Item #10.10.

Page 267 of 383 ends

Project 00110.19 CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Invoice 00110.19-80

Page 3 of 6 ends

Invoice Amount $24,745.06
$24,745.06 $612,779.61 $637,524.67 $610,376.00 ($27,148.67) Current Invoice Previously Invoiced Total Invoiced Budget Remaining Budget Billing Limits
Constantinescu, Alina Senior I 1.75 269.00 $470.75
Total Professional Services for 009 $470.75
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 009 $470.75
009 - Project Management
Diaz Casanueva, Jose Project Level II-B 15.00 221.00 $3,315.00 Constantinescu, Alina Senior I 8.00 269.00 $2,152.00
Total Professional Services for 007 $5,467.00
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 007 $5,467.00
007 - Interim Groundwater Monitoring Report
Kornegay, Travis Project Level I-C 1.50 150.00 $225.00
Constantinescu, Alina Senior I .50 269.00 $134.50
Total Professional Services for 005 $359.50
LWA Professional Services
Employee Title Hours Rate Amount
Total Charges for 005 $359.50
005 - Review and Compile Analytical Data
Caltest Analytical Laboratory 731023 6/23/2025 4,046.40 1.10 $4,451.04 Caltest Analytical Laboratory 725146 12/11/2024 3,540.60 1.10 $3,894.66 Total Outside Services for 004 $8,345.70
Outside Services
Payee Invoice Date Invoice Total Markup Amount
Laurenson, Brian Taxi/Limo/Bus/Auto
Rental
Enterprise
8G3TXK
6/6/2025 1.00 162.58 $162.58
Kornegay, Travis Supplies & Materials Ice 11/11/2024 1.00 15.13 $15.13 Equipment Rental Equipment Rental Field Rig
(field vehicle
and all
equipment) 1
day used @
$200/day
11/25/2024 1.00 200.00 $200.00
Total Reimbursable for 004 $377.71
Payee Expense Code Comment Date Qty Unit Rate Amount
Reimbursables
Total Charges for 004 $10,521.41
Agenda Item #10.10.

Page 268 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 10/29/2024 Diaz Casanueva, Jose Project Level II-B 0.25 $ 221.00 $ 55.25 Task 3: Monitoring Preparation
10/29/2024 Diaz Casanueva, Jose Project Level II-B 0.25 $ 221.00 $ 55.25 10/29/2024 Kornegay, Travis Project Level I-C 0.50 $ 150.00 $ 75.00 10/29/2024 McFadin, Sophie Project Level II-B 0.25 $ 221.00 $ 55.25 10/30/2024 Diaz Casanueva, Jose Project Level II-B 0.50 $ 221.00 $ 110.50 10/30/2024 Kornegay, Travis Project Level I-C 0.50 $ 150.00 $ 75.00 10/31/2024 Kornegay, Travis Project Level I-C 0.25 $ 150.00 $ 37.50 Task 3 subtotal $ 408.50
Task 7: Interim Groundwater Monitoring Report
Team discussion and review of requirements for 4th Quarter 2024 monitoring report. 10/1/2024 Constantinescu, Alina Senior I 2.50 $ 269.00 $ 672.50 10/1/2024 Diaz Casanueva, Jose Project Level II-B 0.75 $ 269.00 $ 165.75 Task 7 subtotal $ 838.25
Task 9: Project Management
Project team coordination, timesheets and expense reviews for invoicing. 10/24/2024 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 10/30/2024 Constantinescu, Alina Senior I 1.00 $ 269.00 $ 269.00 Task 9 subtotal $ 403.50
$ 1,650.25
Task 3: Monitoring Preparation
11/4/2024 Kornegay, Travis Project Level I-C 0.75 $ 150.00 $ 112.50 11/8/2024 Kornegay, Travis Project Level I-C 0.75 $ 150.00 $ 112.50 11/11/2024 Kornegay, Travis Project Level I-C 0.75 $ 150.00 $ 112.50 11/11/2024 Lee, Brandon Tze-Hung Project Level I-B 1.75 $ 176.00 $ 308.00 11/12/2024 Kornegay, Travis Project Level I-C 9.75 $ 150.00 $ 1,462.50 11/12/2024 Lee, Brandon Tze-Hung Project Level I-B 10.50 $ 176.00 $ 1,848.00 11/18/2024 Kornegay, Travis Project Level I-C 0.25 $ 150.00 $ 37.50 11/18/2024 Lee, Brandon Tze-Hung Project Level I-B 0.25 $ 176.00 $ 44.00 11/21/2024 Kornegay, Travis Project Level I-C 0.25 $ 150.00 $ 37.50 11/12/2024 Reimbursable: Field expenses (meals) $ 21.72 Task 3 subtotal $ 4,096.72
Task 4: Perform Monitoring
11/1/2024 Diaz Casanueva, Jose Project Level II-B 0.25 $ 221.00 $ 55.25 11/4/2024 Diaz Casanueva, Jose Project Level II-B 0.25 $ 221.00 $ 55.25 11/25/2024 Reimbursable: Rent field vehicle and equip1.00 $ 200.00 $ 200.00 11/11/2024 Reimbursable: Ice for sample preservation $ 15.13 Task 4 subtotal $ 325.63
$ 4,422.35
Project 110.19 Groundwater Monitoring and Reporting
Invoice 00110.19-80 for October 2024 to July 2025 Work Effort October 2024
Key for cost tables shown below:

Prepare for 4th Quarter 2024 monitoring event (completed 11/12/24): scheduling and team coordination, reserving rental car, coordinating with Caltest, preparing sample bottles and equipment November 2024
Prepare for 4th Quarter 2024 monitoring event (completed 11/12/24): scheduling and team coordination,coordinating with Caltest, preparing sample bottles and equipment Conduct 4th Quarter 2024 monitoring event (completed 11/12/24): team coordination, travel and site visit at St.

Helena WWTRP, monitoring paperwork
October 2024 Work Effort Total
November 2024 Work Effort Total

Page 4 of 6 ends

Agenda Item #10.10.

Page 269 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 10/29/2024 Diaz Casanueva, Jose Project Level II-B 0.25 $ 221.00 $ 55.25 Project 110.19 Groundwater Monitoring and Reporting
Invoice 00110.19-80 for October 2024 to July 2025 Work Effort Key for cost tables shown below:

Task 7: Interim Groundwater Monitoring Report
Review Caltest Lab Report and draft 4th Quarter 2024 monitoring report. 12/20/2024 Diaz Casanueva, Jose Project Level II-B 1.75 $ 221.00 $ 386.75 12/23/2024 Diaz Casanueva, Jose Project Level II-B 7.50 $ 221.00 $ 1,657.50 12/11/2024 Outside Services: Caltest Analytical Laborator 10% markup $ 3,540.60 $ 3,894.66 Task 7 subtotal $ 5,938.91
$ 5,938.91
Task 7: Interim Groundwater Monitoring Report
Review and finalize 4th Quarter 2024 monitoring report. 1/2/2025 Diaz Casanueva, Jose Project Level II-B 1.25 $ 221.00 $ 276.25 1/3/2025 Constantinescu, Alina Senior I 1.00 $ 269.00 $ 269.00 1/31/2025 Constantinescu, Alina Senior I 0.25 $ 269.00 $ 67.25 Task 7 subtotal $ 612.50
Task 9: Project Management
Project team coordination, timesheets and expense reviews for invoicing. 1/7/2025 Constantinescu, Alina Senior I 0.25 $ 269.00 $ 67.25 Task 9 subtotal $ 67.25
$ 679.75
Task 3: Monitoring Preparation
4/2/2025 Constantinescu, Alina Senior I 0.25 $ 269.00 $ 67.25 4/23/2025 Diaz Casanueva, Jose Project Level II-B 2.75 $ 221.00 $ 607.75 4/28/2025 Constantinescu, Alina Senior I 0.25 $ 269.00 $ 67.25 Task 3 subtotal $ 742.25
$ 742.25
Task 3: Monitoring Preparation
Prepare for 1st Semi-Annual 2025 monitoring event (completed 6/3/25): scheduling and team coordination 5/14/2025 Kornegay, Travis Project Level I-C 0.25 $ 150.00 $ 37.50 Task 3 subtotal $ 37.50
$ 37.50
April 2025
May 2025
January 2025
December 2024
December 2024 Work Effort Total
January 2025 Work Effort Total
April 2025 Work Effort Total
Prepare for 1st Semi-Annual 2025 monitoring event (completed 6/3/25): scheduling and team coordination, review of requirements for monitoring report.

May 2025 Work Effort Total

Page 5 of 6 ends

Agenda Item #10.10.

Page 270 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 10/29/2024 Diaz Casanueva, Jose Project Level II-B 0.25 $ 221.00 $ 55.25 Project 110.19 Groundwater Monitoring and Reporting
Invoice 00110.19-80 for October 2024 to July 2025 Work Effort Key for cost tables shown below:

Task 3: Monitoring Preparation
6/2/2025 Kornegay, Travis Project Level I-C 2.25 $ 150.00 $ 337.50 6/2/2025 Lee, Brandon Tze-Hung Project Level I-B 0.75 $ 176.00 $ 132.00 6/3/2025 Lee, Brandon Tze-Hung Project Level I-B 12.00 $ 176.00 $ 2,112.00 6/8/2025 Lee, Brandon Tze-Hung Project Level I-B 0.25 $ 176.00 $ 44.00 6/2/2025 Reimburseables: Ice for sample preservation $ 15.93 Task 3 subtotal $ 2,641.43
Task 4: Perform Monitoring
6/3/2025 Kornegay, Travis Project Level I-C 10.50 $ 150.00 $ 1,575.00 6/4/2025 Kornegay, Travis Project Level I-C 0.75 $ 150.00 $ 112.50 6/6/2025 Reimbursable: Rent field vehicle 1.00 $ 162.58 $ 162.58 6/23/2025 Outside Services: Caltest Analytical Laborator 10% markup $ 4,046.40 $ 4,451.04 Task 4 subtotal $ 6,301.12
Task 5: Review and Compile Analytical Data
Review Caltest Lab Report and prepare data analysis for 1st Semi-Annual 2025 monitoring report. 6/23/2025 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 6/5/2025 Kornegay, Travis Project Level I-C 1.00 $ 150.00 $ 150.00 6/9/2025 Kornegay, Travis Project Level I-C 0.50 $ 150.00 $ 75.00 Task 3 subtotal $ 359.50
Task 7: Interim Groundwater Monitoring Report
Draft, review, and finalize 1st Semi-Annual 2025 monitoring report. 6/30/2025 Constantinescu, Alina Senior I 4.00 $ 269.00 $ 1,076.00 6/30/2025 Diaz Casanueva, Jose Project Level II-B 3.75 $ 221.00 $ 828.75 Task 3 subtotal $ 1,904.75
$ 11,206.80
Task 7: Interim Groundwater Monitoring Report
Finalize and submit 1st Semi-Annual 2025 monitoring report. 7/1/2025 Constantinescu, Alina Senior I 0.25 $ 269.00 $ 67.25 Task 3 subtotal $ 67.25
$ 67.25
Total for Invoice 00110.19-80 $ 24,745.06
July 2025
June 2025
June 2025 Work Effort Total
July 2025 Work Effort Total
Prepare for 1st Semi-Annual 2025 monitoring event (completed 6/3/25): scheduling and team coordination, coordinating with Caltest, preparing sample bottles and equipment Conduct 1st Semi-Annual 2025 monitoring event (completed 6/3/25): team coordination, travel and site visit at St. Helena WWTRP, monitoring paperwork

Page 6 of 6 ends

Agenda Item #10.10.

Page 271 of 383 ends

Project 00110.19 CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Invoice 00110.19-80 Lee, Brandon Tze-Hung
employees
Receipts
Agenda Item #10.10.

Page 272 of 383 ends

Project 00110.19 CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Invoice 00110.19-80 Agenda Item #10.10.

Page 273 of 383 ends

Project 00110.19 CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Invoice 00110.19-80 Kornegay, Travis
Agenda Item #10.10.

Page 274 of 383 ends

Project Number: 110.19 Task: 4
Date(s) of Use:

Item
Daily
Rate
Days
Used Total per Item
Single-parameter Meters & Equipment $30 $0
Digital Flow Meter $60 $0
Multi-parameter Field Meters & Sondes $100 $0
Field Rig (field vehicle and all equipment) $200 1 $200 Survey grade RTK-GPS $250 $0
Sontek RiverSurveyor $250 $0
Tracer study and sensor mapping equipment $250 $0
Total: $200
Date:

Submitted By: Travis Kornegay
11/14/2024
11/25/2024
If multiple events are conducted, a single form may be submitted at the end of each month.

Larry Walker Associates
Field Equipment Usage Record
The purpose of this form is to record usage of LWA owned field equipment.

Complete this form after each field event and submit to the LWA accounting department.

Agenda Item #10.10.

Page 275 of 383 ends

Rental Agreement #: 8G3TXK
Bill Ref #: 1080-1333-1453
Invoice Date: 06/04/2025
5055 CHILES RD Account #: XZSBC03
DAVIS, CA 95616-4439

BILL TO

LARRY WALKER ASSOCIATES
ATTN: NICOLE COLLINS
1480 DREW AVE
STE 100
DAVIS, CA - 95618

RENTAL INFORMATION
Date/Time Out Date/Time In
06/02/2025 04:23 PM 06/03/2025 05:48 PM
Renter

LEE, BRANDON

RENTAL VEHICLES
Miles/Kms
Color License Model Unit Out In
SILVER T013UX ROGU 8FN62Y 36,500 36,537
VIN: 5N1BT3BB8RC705166

CLAIM INFORMATION
Claim# / PO# / RO# Insured
Date of Loss Type of Loss Type of Vehicle
Repair Shop

BILLING DETAIL
Description Qty/Per Rate Amount
TIME & DISTANCE 1 HR 48.50 48.50
TIME & DISTANCE 1 DAY 97.00 97.00
Subtotal 145.50
VEHICLE LICENSE RECOVERY FEE 2 DAY 1.81 3.62
SALES TAX PCT 9.25 13.46
Total Charges (USD) 162.58

PAYMENTS
Deposit Settlement Visa -162.58
Total Payments (USD) -162.58
Amount Due (USD) 0.00
Individual line item charges such as rental rates for Time and Distance, percentage-based charges (e.g., sales taxes and fees or surcharges), and charges divided between multiple parties may be rounded up or down a whole cent to ensure that the charges equal the actual Total Amount Due and/or to avoid fractional cents.

For Billing Inquiries / Payment Terms :

Tel#: +1 9184016000
[email protected]
Payments are due immediately.

Late payments are subject to a finance charge.

Thank You For Choosing Enterprise
Please Return This Portion With Remittance Amount Due (USD) 0.00 Remit To : Paid By:

EAN SERVICES, LLC
PO BOX 402383
ATLANTA, GA 30384-2383
Email Remit To: [email protected]

LARRY WALKER ASSOCIATES
1480 DREW AVE
STE 100
DAVIS, CA 95618
Fed Tax Id: 430724835 Account # Rental Agreement Amount GPBR XZSBC03 8G3TXK 0.00 3005

Page 1 of 1 ends

Agenda Item #10.10.

Page 276 of 383 ends

Description TAT Quantity Unit Price Total Cost
Ammonia as Nitrogen (NH3-N) Standard 7 $52.20 $365.40
Biochemical Oxygen Demand (BOD) Standard 7 $66.60 $466.20 Chloride, by Ion Chromatography Standard 7 $56.70 $396.90 Nitrate, as N, by Ion Chromatography Standard 7 $56.70 $396.90 Nitrogen, Total Kjeldahl (TKN) Standard 7 $82.80 $579.60 Solids, Total Suspended (TSS) Standard 7 $45.90 $321.30 Total Coliform - 15 Tube MPN Standard 7 $82.80 $579.60
Total Dissolved Solids (TDS) Standard 7 $62.10 $434.70
Total $3,540.60
Caltest Analytical Laboratory
1885 North Kelly Road
Napa, California 94558
(707) 258-4000
Please reference the invoice number on your check and remit to:

Invoice Notes
Invoice Invoice No: 725146
Invoice Date: 12/11/2024
Accounts Payable
Larry Walker and Associates
1480 Drew Avenue, Suite 100
Davis, CA 95618
Invoice To:

NELAP/ORELAP Certification 4036 CA-ELAP Certification 1664 Received:

Lab Order:

Project:

Sampled:

Purchase Auth/PO:

Invoice Terms **: Net 30
Z110479

ST HELENA WWTRP
Client
Report To:

CC:
11/12/2024
Alina Constantinescu
Larry Walker & Associates
1480 Drew Avenue, Suite 100
Davis, CA 95618
(510)883-9873
Back-Out
12/11/2024 08:30 Page 1 of 1
**Payment due NET days from Invoice Date or Prior to Release of results if COD Past Due Balances subject to a FINANCE CHARGE of 1.5% per month. *** Securely pay invoices online at CaltestLabs.com *** 1885 North Kelly Road • Napa, California 94558
(707) 258-4000 • e-mail: [email protected]
110.19 Task 4
Agenda Item #10.10.

Page 277 of 383 ends

Description TAT Quantity Unit Price Total Cost
Ammonia as Nitrogen (NH3-N) Standard 8 $52.20 $417.60
Biochemical Oxygen Demand (BOD) Standard 8 $66.60 $532.80 Chloride, by Ion Chromatography Standard 8 $56.70 $453.60 Nitrate, as N, by Ion Chromatography Standard 8 $56.70 $453.60 Nitrogen, Total Kjeldahl (TKN) Standard 8 $82.80 $662.40 Solids, Total Suspended (TSS) Standard 8 $45.90 $367.20 Total Coliform - 15 Tube MPN Standard 8 $82.80 $662.40
Total Dissolved Solids (TDS) Standard 8 $62.10 $496.80
Total $4,046.40
Caltest Analytical Laboratory
1885 North Kelly Road
Napa, California 94558
(707) 258-4000
Please reference the invoice number on your check and remit to:

Invoice Notes
Invoice Invoice No: 731023
Invoice Date: 06/23/2025
Accounts Payable
Larry Walker and Associates
1480 Drew Avenue, Suite 100
Davis, CA 95618
Invoice To:

NELAP/ORELAP Certification 4036 CA-ELAP Certification 1664 Received:

Lab Order:

Project:

Sampled:

Purchase Auth/PO:

Invoice Terms **: Net 30
A060162

ST HELENA WWTRP

BRANDON LEE
Report To:

CC:
06/03/2025
Alina Constantinescu
Larry Walker & Associates
1480 Drew Avenue, Suite 100
Davis, CA 95618
(510)883-9873
Back-Out
06/23/2025 14:14 Page 1 of 1
**Payment due NET days from Invoice Date or Prior to Release of results if COD Past Due Balances subject to a FINANCE CHARGE of 1.5% per month. *** Securely pay invoices online at CaltestLabs.com *** 1885 North Kelly Road • Napa, California 94558
(707) 258-4000 • e-mail: [email protected]
110.19 Task 04
Agenda Item #10.10.

Page 278 of 383 ends
Page 1 of 4 ends

009 - Project Management $.00
008 - Bi-Annual Groundwater Monitoring Report $.00
007 - Interim Groundwater Monitoring Report $.00
006 - Groundwater Fate and Transport Modelling $.00
005 - Review and Compile Analytical Data $.00
004 - Perform Monitoring $3,974.00
003 - Monitoring Preparation $706.93
002 - Prepare a Sampling and Analysis Plan $.00
001 - Development of Monitoring Well Network and Monitoring Well Installation $.00 TOTAL AMOUNT DUE THIS INVOICE $4,680.93

TOTAL PER TASK SUMMARY
City of St. Helena
Attn: Accounts Payable
1088 College Ave.

St. Helena, CA 94574
1480 Drew Avenue, Suite 100
Davis, CA 95618
Please remit payment to
Larry Walker Associates, Inc.

November 10, 2025
Project No. - Invoice No: 00110.19-81
CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Project: 00110.19
PO 14117
For Services Rendered Through 10/31/2025
Agenda Item #10.10.

Page 279 of 383 ends

Project 00110.19 CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Invoice 00110.19-81

Page 2 of 4 ends

Woicekowski, Camille Project Level I-B 10.50 176.00 $1,848.00 Kornegay, Travis Project Level I-C 11.25 150.00 $1,687.50 Constantinescu, Alina Senior I .50 269.00 $134.50
Total Professional Services for 004 $3,670.00
Employee Title Hours Rate Amount
LWA Professional Services
004 - Perform Monitoring
Lee, Brandon Tze-Hung Supplies & Materials Ice 10/16/2025 1.00 14.18 $14.18 Total Reimbursable for 003 $14.18
Payee Expense Code Comment Date Qty Unit Rate Amount
Reimbursables
Kornegay, Travis Project Level I-C 4.25 150.00 $637.50
Diaz Casanueva, Jose Project Level II-B .25 221.00 $55.25 Total Professional Services for 003 $692.75
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 003 $706.93
003 - Monitoring Preparation
City of St. Helena
Attn: Accounts Payable
1088 College Ave.

St. Helena, CA 94574
CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Project: 00110.19
PO 14117
For Services Rendered Through 10/31/2025
November 10, 2025
Project No. - Invoice No: 00110.19-81
Agenda Item #10.10.

Page 280 of 383 ends

Project 00110.19 CITY OF ST. HELENA GROUNDWATER MONITORING AND REPORTING Invoice 00110.19-81

Page 3 of 4 ends

Invoice Amount $4,680.93
$4,680.93 $637,524.67 $642,205.60 $610,376.00 ($31,829.60) Current Invoice Previously Invoiced Total Invoiced Budget Remaining Budget Billing Limits
Woicekowski, Camille Mileage Drive to St.

Helena
groundwater
monitoring
10/21/2025 120.00 0.70 $84.00
Equipment Rental Equipment Rental Field Rig
(field vehicle
and all
equipment) 1
day 1 hour
used at
$200/day
10/22/2025 1.00 220.00 $220.00
Total Reimbursable for 004 $304.00
Reimbursables
Payee Expense Code Comment Date Qty Unit Rate Amount
Total Charges for 004 $3,974.00
Agenda Item #10.10.

Page 281 of 383 ends

*Note: no charges for August 2025 and September 2025
Date Employee Name Employee Title Hours Hourly Rat Cost 10/3/2025 Diaz Casanueva, Jose Project Level II-B 0.25 $ 221.00 $ 55.25 Task 3: Monitoring Preparation
10/3/2025 Diaz Casanueva, Jose Project Level II-B 0.25 $ 221.00 $ 55.25 10/3/2025 Kornegay, Travis Project Level I-C 0.25 $ 150.00 $ 37.50 10/8/2025 Kornegay, Travis Project Level I-C 0.50 $ 150.00 $ 75.00 10/15/2025 Kornegay, Travis Project Level I-C 0.50 $ 150.00 $ 75.00 10/16/2025 Kornegay, Travis Project Level I-C 0.25 $ 150.00 $ 37.50 10/16/2025 Reimbursable Ice for sample preservation $ 14.18 10/17/2025 Kornegay, Travis Project Level I-C 0.50 $ 150.00 $ 75.00 10/20/2025 Kornegay, Travis Project Level I-C 2.25 $ 150.00 $ 337.50 Task 3 subtotal $ 706.93
Task 4: Perform Monitoring
10/6/2025 Constantinescu, Alina Senior I 0.25 $ 269.00 $ 67.25 10/8/2025 Constantinescu, Alina Senior I 0.25 $ 269.00 $ 67.25 10/20/2025 Woicekowski, Camille Project Level I-B 0.25 $ 176.00 $ 44.00 10/21/2025 Kornegay, Travis Project Level I-C 9.75 $ 150.00 $ 1,462.50 10/21/2025 Woicekowski, Camille Project Level I-B 10.00 $ 176.00 $ 1,760.00 10/21/2025 Reimbursable Field vehicle rental (1day, 1hr) 1.10 $ 200.00 $ 220.00 10/22/2025 Kornegay, Travis Project Level I-C 1.50 $ 150.00 $ 225.00 10/22/2025 Reimbursable Mileage 120.00 $ 0.70 $ 84.00
10/31/2025 Woicekowski, Camille Project Level I-B 0.25 $ 176.00 $ 44.00 Task 9 subtotal $ 3,974.00
$ 4,680.93
Total for Invoice 00110.19-81 $ 4,680.93
Conduct 2nd Semi-Annual 2025 monitoring event (conducted 10/21/2025): team coordination, travel and site visit at St. Helena WWTRP, monitoring paperwork, equipment rental, and supplies.

October 2024 Work Effort Total
Prepare for 2nd Semi-Annual 2025 monitoring event (conducted 10/21/2025): scheduling and team coordination, review of requirements for monitoring report, prepare bottles and equipment.

Project 110.19 Groundwater Monitoring and Reporting
Invoice 00110.19-81 for August 2025 to October 2025 Work Effort* October 2025
Key for cost tables shown below:

Page 4 of 4 ends

Agenda Item #10.10.

Page 282 of 383 ends

Project Number: 110.19 Task: 4
Date(s) of Use:

Item Daily Rate Days Used
Total per
Item
Single-parameter Meters & Equipment $30 $0
Digital Flow Meter $60 $0
Multi-parameter Field Meters & Sondes $100 $0
Field Rig (field vehicle and all equipment) $200 1.1 $220 Survey grade RTK-GPS $250 $0
Sontek RiverSurveyor $250 $0
Tracer study and sensor mapping equipment $250 $0
Total: $220
Date:

Submitted By: Travis Kornegay
The purpose of this form is to record usage of LWA owned field equipment.

Complete this form after each field event and submit to the LWA accounting department.

If multiple events are conducted, a single form may be submitted at the end of each month.

Larry Walker Associates
Field Equipment Usage Record
10/22/2025
10/21/25 (25 hours)
Agenda Item #10.10.

Page 283 of 383 ends

Agenda Item #10.10.

Page 284 of 383 ends
Page 1 of 16 ends

06 - Project Management $189.75
05 - Effluent Monitoring $2,592.00
04 - Pollution Prevention Assistance $8,104.25
03 - Recycled Water Permit Assistance $2,121.00
02 - Preparation of SMRs and Annual Reports $93,501.25
01 - General Consulting $32,945.00
TOTAL AMOUNT DUE THIS INVOICE $139,453.25

TOTAL PER TASK SUMMARY
City of St. Helena
Attn: Accounts Payable
1088 College Ave.

St. Helena, CA 94574
1480 Drew Avenue, Suite 100
Davis, CA 95618
Please remit payment to
Larry Walker Associates, Inc.

November 10, 2025
Project No. - Invoice No: 00110.24-17
CITY OF ST. HELENA 2021-2022 REGULATORY ASSISTANCE
Project: 00110.24
For Services Rendered Through 7/31/2025
Agenda Item #10.10.

Page 285 of 383 ends

Project 00110.24 CITY OF ST. HELENA 2021-2022 REGULATORY ASSISTANCE Invoice 00110.24-17

Page 2 of 16 ends

Rojas Cala, Brenda Yomara Project Level I-A 10.50 202.00 $2,121.00 Total Professional Services for 03 $2,121.00
LWA Professional Services
Employee Title Hours Rate Amount
Total Charges for 03 $2,121.00
03 - Recycled Water Permit Assistance
Trouchon, Michael Associate I 5.25 304.00 $1,596.00
Donikian, Nubia Project Level II-B 25.75 221.00 $5,690.75 Constantinescu, Alina Senior I 320.50 269.00 $86,214.50 Total Professional Services for 02 $93,501.25
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 02 $93,501.25
02 - Preparation of SMRs and Annual Reports
Vilas, David Senior I 8.25 269.00 $2,219.25
Rueda Villamil, Paula Project Level I-B 11.75 176.00 $2,068.00 Nguyen, Thi Nhu Khanh Project Level I-A 1.00 202.00 $202.00 Constantinescu, Alina Senior I 96.75 269.00 $26,025.75
Conners, Denise Helene Associate II 7.50 324.00 $2,430.00 Total Professional Services for 01 $32,945.00
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 01 $32,945.00
01 - General Consulting
City of St. Helena
Attn: Accounts Payable
1088 College Ave.

St. Helena, CA 94574
CITY OF ST. HELENA 2021-2022 REGULATORY ASSISTANCE
Project: 00110.24
For Services Rendered Through 7/31/2025
November 10, 2025
Project No. - Invoice No: 00110.24-17
Agenda Item #10.10.

Page 286 of 383 ends

Project 00110.24 CITY OF ST. HELENA 2021-2022 REGULATORY ASSISTANCE Invoice 00110.24-17

Page 3 of 16 ends

Invoice Amount $139,453.25
$139,453.25 $65,334.50 $204,787.75 $65,371.00 ($139,416.75) Current Invoice Previously Invoiced Total Invoiced Budget Remaining Budget Billing Limits
Donikian, Nubia Project Level II-B .25 221.00 $55.25
Constantinescu, Alina Senior I .50 269.00 $134.50
Total Professional Services for 06 $189.75
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 06 $189.75
06 - Project Management
Caltest Analytical Laboratory Misc. Reimbursable
Exps
Inv. #719684 5/22/2024 1.00 2,592.00 $2,592.00
Total Reimbursable for 05 $2,592.00
Payee Expense Code Comment Date Qty Unit Rate Amount
Reimbursables
Total Charges for 05 $2,592.00
05 - Effluent Monitoring
Donikian, Nubia Project Level II-B 17.50 221.00 $3,867.50 Constantinescu, Alina Senior I 15.75 269.00 $4,236.75
Total Professional Services for 04 $8,104.25
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 04 $8,104.25
04 - Pollution Prevention Assistance
Agenda Item #10.10.

Page 287 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Task 2: Preparation of SMRs and Annual Reports
Prepare 2022 Pollution Prevention Report.
2/9/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 2/10/2023 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 2/24/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 2/27/2023 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 Task 2 subtotal $ 1,345.00
Task 4: Pollution Prevention Assistance
Prepare 2022 Pollution Prevention Report.
2/17/2023 Donikian, Nubia Project Level II-B 1.00 $221.00 $ 221.00 Task 4 subtotal $ 221.00
$ 1,566.00
Task 1: General Consulting
3/20/2023 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 3/20/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 3/23/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 3/30/2023 Constantinescu, Alina Senior I 3.50 $269.00 $ 941.50 Task 1 subtotal $ 1,291.50
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab reports and prepare January 2023 SMR/DMR Report and Cover Letter. 3/1/2023 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 3/7/2023 Constantinescu, Alina Senior I 5.50 $269.00 $ 1,479.50 3/14/2023 Constantinescu, Alina Senior I 1.25 $269.00 $ 336.25 3/15/2023 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 3/16/2023 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 3/17/2023 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 3/20/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 3,564.25
Task 4: Pollution Prevention Assistance
Finalize and submit 2022 Pollution Prevention Report.
3/7/2023 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 4 subtotal $ 67.25
Task 6: Project Management
Project team coordination, timesheet reviews for invoicing. 3/23/2023 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 6 subtotal $ 67.25
$ 4,990.25
As needed tasks: Research effluent limit violations and Riverwatch settlement, research requirements for biologist SOP for SSOs, calculate 2021 copper loads for BACWA fees.

February 2023 Work Effort Total
March 2023
Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

February 2023
March 2023 Work Effort Total

Page 4 of 16 ends

Agenda Item #10.10.

Page 288 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
4/3/2023 Conners, Denise Helene Associate II 0.50 $324.00 $ 162.00 4/3/2023 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 4/4/2023 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 4/4/2023 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 4/5/2023 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 4/10/2023 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 4/21/2023 Rueda Villamil, Paula Project Level I-B 1.50 $176.00 $ 264.00 4/24/2023 Constantinescu, Alina Senior I 0.75 $269.00 $ 201.75 4/24/2023 Rueda Villamil, Paula Project Level I-B 1.75 $176.00 $ 308.00 4/25/2023 Rueda Villamil, Paula Project Level I-B 2.50 $176.00 $ 440.00 4/27/2023 Rueda Villamil, Paula Project Level I-B 2.00 $176.00 $ 352.00 4/28/2023 Conners, Denise Helene Associate II 0.50 $324.00 $ 162.00 4/28/2023 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 1 subtotal $ 5,131.50
Task 2: Preparation of SMRs and Annual Reports
4/26/2023 Constantinescu, Alina Senior I 6.50 $269.00 $ 1,748.50 4/26/2023 Trouchon, Michael Associate I 0.25 $304.00 $ 76.00 4/27/2023 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 4/28/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 2,362.50
$ 7,494.00
Task 1: General Consulting
As needed tasks: Prepare biologist SOP and other updates for the SSMP Spill Emergency Response Plan (SER 5/1/2023 Rueda Villamil, Paula Project Level I-B 2.50 $176.00 $ 440.00 5/8/2023 Rueda Villamil, Paula Project Level I-B 1.50 $176.00 $ 264.00 5/10/2023 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 5/16/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 5/16/2023 Vilas, David Senior I 1.50 $269.00 $ 403.50
5/17/2023 Constantinescu, Alina Senior I 0.75 $269.00 $ 201.75 5/17/2023 Vilas, David Senior I 2.75 $269.00 $ 739.75
5/18/2023 Vilas, David Senior I 1.00 $269.00 $ 269.00
5/19/2023 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 5/22/2023 Vilas, David Senior I 2.00 $269.00 $ 538.00
5/23/2023 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 5/23/2023 Vilas, David Senior I 1.00 $269.00 $ 269.00
5/24/2023 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 5/26/2023 Constantinescu, Alina Senior I 3.50 $269.00 $ 941.50 5/30/2023 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 Task 1 subtotal $ 6,353.00
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare April 2023 SMR/DMR Report and Cover Letter. 5/22/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 5/25/2023 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 5/26/2023 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 Task 2 subtotal $ 1,614.00
$ 7,967.00
April 2023 Work Effort Total
May 2023
Review Alpha Reports and prepare March 2023 SMR/DMR Report and Cover Letter, including calculation of 6- week rolling geomean for E. coli data (new requirement) April 2023
As needed tasks: Communication with Sonoma Water regarding biologist SOP for SSOs, updates to SSMP Spill Emergency Response Plan (SERP), Update the Wastewater Facilities Report and the WWTP Contingency and Spill Prevention Plans per reqirements from recent RWQCB inspection, research approach for reporting May 2023 Work Effort Total

Page 5 of 16 ends

Agenda Item #10.10.

Page 289 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare April 2023 SMR/DMR Report and Cover Letter. 6/21/2023 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 6/22/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 6/27/2023 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 Task 2 subtotal $ 1,479.50
$ 1,479.50
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare June 2023 SMR/DMR Report and Cover Letter. 7/21/2023 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 7/24/2023 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 7/28/2023 Constantinescu, Alina Senior I 6.50 $269.00 $ 1,748.50 7/31/2023 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 2 subtotal $ 2,488.25
$ 2,488.25
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare July 2023 SMR/DMR Report and Cover Letter. 8/21/2023 Constantinescu, Alina Senior I 6.50 $269.00 $ 1,748.50 8/25/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 8/29/2023 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 8/30/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 2,690.00
$ 2,690.00
Task 1: General Consulting
As needed tasks: Review permit amendments re: total residual chlorine; respond to issue re: annual flows for CIR 9/8/2023 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 9/29/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 1 subtotal $ 672.50
Task 2: Preparation of SMRs and Annual Reports
9/15/2023 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 9/20/2023 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 9/22/2023 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 9/26/2023 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 9/27/2023 Constantinescu, Alina Senior I 5.50 $269.00 $ 1,479.50 9/28/2023 Constantinescu, Alina Senior I 6.00 $269.00 $ 1,614.00 9/29/2023 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 Task 2 subtotal $ 5,245.50
$ 5,918.00
June 2023 Work Effort Total
August 2023
July 2023
June 2023
August 2023 Work Effort Total
Review Alpha Lab Reports and prepare August 2023 SMR/DMR Report and Cover Letter; Review CIWQS withdrawn SMRs, phone call with Kerry O'connor, RWQCB, discussion regarding withdrawn March 2023 SMR July 2023 Work Effort Total
September 2023
September 2023 Work Effort Total

Page 6 of 16 ends

Agenda Item #10.10.

Page 290 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
As needed tasks: Research and discussion regarding response and compliance strategies for bacteria violations 10/11/2023 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 10/18/2023 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 10/23/2023 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 10/24/2023 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 Task 1 subtotal $ 1,776.00
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare September 2023 SMR/DMR Report and Cover Letter. 10/20/2023 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 10/23/2023 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 10/26/2023 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 10/30/2023 Constantinescu, Alina Senior I 0.75 $269.00 $ 201.75 Task 2 subtotal $ 3,160.75
$ 4,936.75
Task 1: General Consulting
11/2/2023 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 11/8/2023 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 11/17/2023 Constantinescu, Alina Senior I 0.75 $269.00 $ 201.75 Task 1 subtotal $ 874.25
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare October 2023 SMR/DMR Report and Cover Letter. 11/27/2023 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 11/28/2023 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 11/29/2023 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 11/30/2023 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 Task 2 subtotal $ 3,228.00
$ 4,102.25
Task 1: General Consulting
12/18/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 12/27/2023 Conners, Denise Helene Associate II 0.75 $324.00 $ 243.00 12/29/2023 Conners, Denise Helene Associate II 2.50 $324.00 $ 810.00 12/31/2023 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 Task 1 subtotal $ 1,268.50
Task 2: Preparation of SMRs and Annual Reports
12/8/2023 Donikian, Nubia Project Level II-B 4.75 $221.00 $ 1,049.75 12/12/2023 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 12/15/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 12/15/2023 Donikian, Nubia Project Level II-B 0.25 $221.00 $ 55.25 12/18/2023 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 12/19/2023 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 12/20/2023 Donikian, Nubia Project Level II-B 4.25 $221.00 $ 939.25 12/21/2023 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 Task 2 subtotal $ 3,792.75
$ 5,061.25
October 2023
October 2023 Work Effort Total
As needed tasks: Call with Chace Clock re: new chlorine requirements and inability to conduct continuous monitoring. Emails and call with RWQCB to arrange alternate arrangements for TRC monitoring.

December 2023
As needed tasks: Continue discussion regarding response and compliance strategies for bacteria violations; provide information on Regional Water Board NPDES Permit amendments, inclding new TRC monitoring November 2023
December 2023 Work Effort Total
November 2023 Work Effort Total
Review Alpha Lab Reports and prepare November 2023 SMR/DMR Report and Cover Letter; commence draft 2023 WWTRP Annual Report and 2023 Pollution Prevention Report.

Page 7 of 16 ends

Agenda Item #10.10.

Page 291 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
1/2/2024 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 1/6/2024 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 1/9/2024 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 1/18/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 1/19/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 1 subtotal $ 1,238.00
Task 2: Preparation of SMRs and Annual Reports
1/3/2024 Donikian, Nubia Project Level II-B 1.00 $221.00 $ 221.00 1/8/2024 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 1/8/2024 Donikian, Nubia Project Level II-B 0.50 $221.00 $ 110.50 1/9/2024 Donikian, Nubia Project Level II-B 0.75 $221.00 $ 165.75 1/11/2024 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 1/17/2024 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 1/22/2024 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 1/23/2024 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 1/25/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 1/26/2024 Constantinescu, Alina Senior I 3.50 $269.00 $ 941.50 1/29/2024 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 1/30/2024 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 1/31/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 2 subtotal $ 6,079.00
Task 4: Pollution Prevention Assistance
Prepare historical data plots and draft 2023 Pollution Prevention Report. 1/18/2024 Donikian, Nubia Project Level II-B 3.00 $221.00 $ 663.00 1/22/2024 Donikian, Nubia Project Level II-B 0.50 $221.00 $ 110.50 1/23/2024 Donikian, Nubia Project Level II-B 0.50 $221.00 $ 110.50 1/30/2024 Donikian, Nubia Project Level II-B 1.50 $221.00 $ 331.50 Task 4 subtotal $ 1,215.50
$ 8,532.50
Review Alpha Lab Reports and prepare December 2023 SMR/DMR Report and Cover Letter; Prepare RFI, update annual mercury load calculation, and draft 2023 WWTRP Annual Report.

As needed tasks: Call and email followup with Chace Clock re: new discharge requirements new chlorine requirements and inability to conduct continuous monitoring. Emails and call with RWQCB to arrange alternate arrangements for TRC monitoring; Draft December 2023 SMR and DMR report.

January 2024
January 2024 Work Effort Total

Page 8 of 16 ends

Agenda Item #10.10.

Page 292 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
2/5/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 2/7/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 2/9/2024 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 2/12/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 2/12/2024 Nguyen, Thi Nhu Khanh Project Level I-A 1.00 $202.00 $ 202.00 2/28/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 1 subtotal $ 1,278.00
Task 2: Preparation of SMRs and Annual Reports
2/1/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 2/9/2024 Donikian, Nubia Project Level II-B 0.75 $221.00 $ 165.75 2/13/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 2/15/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 2/16/2024 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 2/21/2024 Constantinescu, Alina Senior I 3.50 $269.00 $ 941.50 2/22/2024 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 2/23/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 2/26/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 2/27/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 2/28/2024 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 2/29/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 Task 2 subtotal $ 3,595.50
Task 4: Pollution Prevention Assistance
Revise, finalize, and submit 2023 Pollution Prevention Report. 2/8/2024 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 2/9/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 2/13/2024 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 2/26/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 2/27/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 4 subtotal $ 2,421.00
Task 6: Project Management
Project team coordination, timesheet reviews for invoicing. 2/2/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 6 subtotal $ 67.25
$ 7,361.75
Review Alpha Lab Reports and prepare January 2024 SMR/DMR Report and Cover Letter; Finalize and upload 2023 WWTRP Annual Report.

As needed tasks: Communication re: regulatory reporting re: CCB power loss; Advise on SSO reporting; Question re: requirements for accelerated monitoring.

February 2024
February 2024 Work Effort Total

Page 9 of 16 ends

Agenda Item #10.10.

Page 293 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
3/4/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 3/6/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 3/7/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 3/8/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 3/13/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 3/22/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 3/26/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 1 subtotal $ 739.75
Task 2: Preparation of SMRs and Annual Reports
3/22/2024 Constantinescu, Alina Senior I 3.50 $269.00 $ 941.50 3/27/2024 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 3/28/2024 Constantinescu, Alina Senior I 6.50 $269.00 $ 1,748.50 3/29/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 Task 2 subtotal $ 3,766.00
$ 4,505.75
Task 1: General Consulting
4/2/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 4/3/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 4/5/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 4/10/2024 Constantinescu, Alina Senior I 0.75 $269.00 $ 201.75 4/23/2024 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 4/26/2024 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 4/29/2024 Constantinescu, Alina Senior I 6.50 $269.00 $ 1,748.50 4/30/2024 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 Task 1 subtotal $ 4,774.75
$ 4,774.75
March 2024
As needed tasks: Discussion re: increased discharge flows; Follow-up emails re: copper accelerated monitoring and progress of MBR upgrades; Calculate 2022 metal loads for BACWA fees, per SFEI request; Discussion re:

Collection Systems Annual Report (new requirement in 2022 SSS WDR).

Review Alpha Lab Reports and prepare February 2024 SMR/DMR Report and Cover Letter; Follow-up re:
ammonia lab results.

April 2024 Work Effort Total
March 2024 Work Effort Total
As needed tasks: Discussion re: required monitoring for ammonia compliance; Questions re: June 2022 inspection report; Revise and re-submit April 2022 withdrawn report; 'Review Alpha Lab Reports and prepare March 2024 SMR/DMR Report and Cover Letter
April 2024

Page 10 of 16 ends

Agenda Item #10.10.

Page 294 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
As needed tasks: Research re: monitoring requirements in non-discharge season 5/1/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 1 subtotal $ 134.50
Task 2: Preparation of SMRs and Annual Reports
5/22/2024 Trouchon, Michael Associate I 1.00 $304.00 $ 304.00 5/23/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 5/23/2024 Trouchon, Michael Associate I 4.00 $304.00 $ 1,216.00 5/28/2024 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 5/29/2024 Constantinescu, Alina Senior I 6.50 $269.00 $ 1,748.50 5/30/2024 Constantinescu, Alina Senior I 5.00 $269.00 $ 1,345.00 Task 2 subtotal $ 5,151.50
Task 5: Effluent Monitoring
Napa River collaborative monitoring.
5/22/2024 Reimbursable Expense Caltest Analytical Laboaratory (1/3 of Inv. #719684 $ 2,592.00 Task 5 subtotal $ 2,592.00
$ 7,878.00
Task 1: General Consulting
As needed tasks: Review permit requirements for Napa River collaborative monitoring. 6/12/2024 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 Task 1 subtotal $ 81.00
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare May 2024 SMR/DMR Report and Cover Letter. 6/21/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 6/27/2024 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 6/28/2024 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 Task 2 subtotal $ 2,555.50
$ 2,636.50
Task 1: General Consulting
7/3/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 7/9/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 7/11/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 7/17/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 Task 1 subtotal $ 941.50
Task 2: Preparation of SMRs and Annual Reports
7/22/2024 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 7/24/2024 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 7/26/2024 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 7/29/2024 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 7/30/2024 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 Task 2 subtotal $ 3,362.50
$ 4,304.00
Review Alpha Lab Reports and Caltest Napa River Monitoring Report for priority pollutants and prepare April 2024 SMR/DMR Report and Cover Letter.

June 2024 Work Effort Total
May 2024
July 2024
May 2024 Work Effort Total
July 2024 Work Effort Total
Review Alpha Lab Reports and prepare June 2024 SMR/DMR Report and Cover Letter, including recent violation related to CCB; Revise CIWQS-withdrawn reports.

As needed tasks: Review results of Napa River collaborative monitoring; Research and discussion re: permit monitoring requirements and sampling points nomenclature; Follow-up on CCB compliance issues.

June 2024

Page 11 of 16 ends

Agenda Item #10.10.

Page 295 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
As needed tasks: Research and follow-up on influent monitoring requirements and pH limits for CCB discharge. 8/2/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 8/28/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 1 subtotal $ 201.75
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare July 2024 SMR/DMR Report and Cover Letter. 8/28/2024 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 8/29/2024 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 8/30/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 2,555.50
$ 2,757.25
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare Augusr 2024 SMR/DMR Report and Cover Letter. 9/24/2024 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 9/26/2024 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 9/30/2024 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 Task 2 subtotal $ 1,883.00
$ 1,883.00
Task 1: General Consulting
10/1/2024 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 10/1/2024 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 10/17/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 10/23/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 10/24/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 10/31/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 1 subtotal $ 1,224.25
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare September 2024 SMR/DMR Report and Cover Letter. 10/23/2024 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 10/28/2024 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 10/29/2024 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 10/30/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 2,421.00
October 2024 Work Effort Total $ 3,645.25
As needed tasks: Research example MMP exemptions; Research and follow-up on MBR monitoring questions; Review guidance on PCB protocols from BACWA Lab Committee.

October 2024
September 2024
September 2024 Work Effort Total
August 2024 Work Effort Total
August 2024

Page 12 of 16 ends

Agenda Item #10.10.

Page 296 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
11/1/2024 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 11/4/2024 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 11/13/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 11/19/2024 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 Task 1 subtotal $ 2,233.00
Task 2: Preparation of SMRs and Annual Reports
11/4/2024 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 11/15/2024 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 11/19/2024 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 11/20/2024 Constantinescu, Alina Senior I 3.50 $269.00 $ 941.50 11/21/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 2,959.00
$ 5,192.00
Task 1: General Consulting
12/4/2024 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 12/4/2024 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 12/6/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 12/11/2024 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 1 subtotal $ 753.50
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare November 2024 SMR/DMR Report and Cover Letter. 12/18/2024 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 12/23/2024 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 12/26/2024 Constantinescu, Alina Senior I 6.50 $269.00 $ 1,748.50 12/30/2024 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 3,497.00
$ 4,250.50
December 2024
Review Alpha Lab Reports and prepare October 2024 SMR/DMR Report and Cover Letter; Revise and resubmit April 2024 withdrawn SMR
As needed tasks: Compile violation tally and transmit to Joe Leach; Provide MBR update to the RWQCB; Researched RMP requirements in NPDES permit to answer BACWA questions December 2024 Work Effort Total
November 2024
As needed tasks: Research and follow-up on receiving water observations and data compilation; Respond to inquiry re: accelerated monitoring
November 2024 Work Effort Total

Page 13 of 16 ends

Agenda Item #10.10.

Page 297 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
As needed tasks: Questions and research re: groundwater monitoring 1/31/2025 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 Task 1 subtotal $ 403.50
Task 2: Preparation of SMRs and Annual Reports
1/8/2025 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 1/8/2025 Donikian, Nubia Project Level II-B 2.00 $221.00 $ 442.00 1/9/2025 Constantinescu, Alina Senior I 3.50 $269.00 $ 941.50 1/10/2025 Donikian, Nubia Project Level II-B 3.75 $221.00 $ 828.75 1/13/2025 Donikian, Nubia Project Level II-B 4.75 $221.00 $ 1,049.75 1/16/2025 Donikian, Nubia Project Level II-B 0.75 $221.00 $ 165.75 1/17/2025 Donikian, Nubia Project Level II-B 2.25 $221.00 $ 497.25 1/21/2025 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 1/23/2025 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 1/24/2025 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 1/27/2025 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 1/28/2025 Constantinescu, Alina Senior I 3.50 $269.00 $ 941.50 1/29/2025 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 1/30/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 9,708.50
$ 10,112.00
Task 1: General Consulting
As needed tasks: Respond to CIWQS SSO question
2/19/2025 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 1 subtotal $ 67.25
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare January 2025 SMR/DMR Report and Cover Letter. 2/24/2025 Constantinescu, Alina Senior I 3.00 $269.00 $ 807.00 2/25/2025 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 2/26/2025 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 2/27/2025 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 Task 2 subtotal $ 2,690.00
Task 4: Pollution Prevention Assistance
Download CIWQS data, prepare historical data plots, and draft 2024 Pollution Prevention Report. 2/10/2025 Donikian, Nubia Project Level II-B 2.25 $221.00 $ 497.25 2/11/2025 Donikian, Nubia Project Level II-B 0.50 $221.00 $ 110.50 2/12/2025 Constantinescu, Alina Senior I 1.75 $269.00 $ 470.75 2/12/2025 Donikian, Nubia Project Level II-B 4.00 $221.00 $ 884.00 2/13/2025 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 2/13/2025 Donikian, Nubia Project Level II-B 3.75 $221.00 $ 828.75 2/14/2025 Donikian, Nubia Project Level II-B 0.50 $221.00 $ 110.50 2/20/2025 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 2/24/2025 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 2/28/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 4 subtotal $ 4,112.25
$ 6,869.50
February 2025
Review Alpha Lab Reports and prepare December 2024 SMR/DMR Report and Cover Letter; Prepare request for information and draft 2024 WWTRP Annual Report.

January 2025
February 2025 Work Effort Total
January 2025 Work Effort Total

Page 14 of 16 ends

Agenda Item #10.10.

Page 298 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
As needed tasks: Compile annual metal loadings for BACWA fees, per SFEI's request. 3/21/2025 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 1 subtotal $ 67.25
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare February 2025 SMR/DMR Report and Cover Letter. 3/25/2025 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 3/26/2025 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 3/27/2025 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 Task 2 subtotal $ 1,883.00
$ 1,950.25
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare March 2025 SMR/DMR Report and Cover Letter; Prepare 2024 Volumet 4/28/2025 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 4/29/2025 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 4/30/2025 Constantinescu, Alina Senior I 6.00 $269.00 $ 1,614.00 Task 2 subtotal $ 2,824.50
Task 4: Pollution Prevention Assistance
Follow-up on 2024 Pollution Prevention Report submittal. 4/3/2025 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 4 subtotal $ 67.25
$ 2,891.75
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare April 2025 SMR/DMR Report and Cover Letter. 5/28/2025 Constantinescu, Alina Senior I 5.00 $269.00 $ 1,345.00 5/29/2025 Constantinescu, Alina Senior I 5.50 $269.00 $ 1,479.50 5/30/2025 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 2 subtotal $ 2,891.75
$ 2,891.75
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare May 2025 SMR/DMR Report and Cover Letter. 6/25/2025 Constantinescu, Alina Senior I 3.50 $269.00 $ 941.50 6/26/2025 Constantinescu, Alina Senior I 2.00 $269.00 $ 538.00 6/27/2025 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 6/30/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 2,824.50
Task 6: Project Management
Project team coordination re: upcoming NPDES permit renewal. 6/18/2025 Donikian, Nubia Project Level II-B 0.25 $221.00 $ 55.25 Task 6 subtotal $ 55.25
June 2025 Work Effort Total $ 2,879.75
May 2025 Work Effort Total
April 2025 Work Effort Total
March 2025 Work Effort Total
June 2025
May 2025
April 2025
March 2025

Page 15 of 16 ends

Agenda Item #10.10.

Page 299 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 2/9/2023 Constantinescu, Alina Senior I 0.50 $ 269.00 $ 134.50 Project 110.24 Regulatory Assistance
Invoice 00110.24-17 for February 2023 to July 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
As needed tasks: Research on total coliform monitoring requirements; Inquiries regarding ROWD content. 7/1/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 7/2/2025 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 7/10/2025 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 7/14/2025 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 7/17/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 7/18/2025 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 7/21/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 7/23/2025 Conners, Denise Helene Associate II 0.50 $324.00 $ 162.00 7/23/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 7/29/2025 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 Task 1 subtotal $ 1,439.75
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare June2025 SMR/DMR Report and Cover Letter. 7/21/2025 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 7/25/2025 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 7/29/2025 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 Task 2 subtotal $ 1,883.00
Task 3: Recycled Water Permit Assitance
Prepare NPDES Permit Renewal Package
7/14/2025 Rojas Cala, Brenda YomaraProject Level I-A 1.00 $202.00 $ 202.00 7/16/2025 Rojas Cala, Brenda YomaraProject Level I-A 3.00 $202.00 $ 606.00 7/17/2025 Rojas Cala, Brenda YomaraProject Level I-A 2.50 $202.00 $ 505.00 7/18/2025 Rojas Cala, Brenda YomaraProject Level I-A 1.50 $202.00 $ 303.00 7/20/2025 Rojas Cala, Brenda YomaraProject Level I-A 1.00 $202.00 $ 202.00 7/31/2025 Rojas Cala, Brenda YomaraProject Level I-A 1.50 $202.00 $ 303.00 Task 3 subtotal $ 2,121.00
$ 5,443.75
Total for Invoice 00110.24-17 $139,453.25
July 2025 Work Effort Total
July 2025

Page 16 of 16 ends

Agenda Item #10.10.

Page 300 of 383 ends

Description TAT Quantity Unit Price Total Cost
2,3,7,8-TCDD by 1613B (subcontracted) Standard 2 $350.00 $700.00 524.2 Volatile Compounds Standard 2 $322.05 $644.10
Aluminum, Total, ICPMS-CM Analysis Standard 2 $42.75 $85.50 Asbestos - Water (sub) Standard 2 $290.00 $580.00
Chloride, by Ion Chromatography Standard 2 $57.00 $114.00 Color Standard 2 $68.40 $136.80
Cyanide, Total (ML) Standard 2 $107.35 $214.70
EPA 505 - Chlorinated Pesticides (sub) Standard 2 $226.00 $452.00 EPA 525.2 - Semivolatile Organics (sub) Standard 2 $348.00 $696.00 EPA 547 - Glyphosate (subcontracted) Standard 2 $212.00 $424.00 Electrical Conductance Standard 2 $41.80 $83.60
Fluoride, by Ion Chromatography Standard 2 $57.00 $114.00 ICPMS-CM Metals, Total (ML) Standard 2 $311.60 $623.20
Iron, Total, ICPMS-CM Analysis Standard 2 $42.75 $85.50 MBAS Surfactants Standard 2 $117.80 $235.60
Manganese, Total, ICPMS-CM Analysis Standard 2 $42.75 $85.50 Mercury, Total, Low Level Standard 2 $94.05 $188.10
Nitrate + Nitrite as N (NO3+NO2-N) Standard 2 $57.00 $114.00 Nitrate, as N, by Ion Chromatography Standard 2 $57.00 $114.00 Nitrite as N (NO2-N) Standard 2 $49.40 $98.80
Odor Standard 2 $73.15 $146.30
Oil & Grease, Total Standard 2 $120.65 $241.30
Phenol (Subcontracted) Standard 2 $110.20 $220.40
Invoice Invoice No: 719864
Invoice Date: 05/22/2024
Accounts Payable
Town of Yountville
6550 Yount St
Yountville, CA 94599
Invoice To:

NELAP/ORELAP Certification 4036 CA-ELAP Certification 1664 Received:

Lab Order:

Project:

Sampled:

Purchase Auth/PO:

Invoice Terms **: Net 30
Z050830

AG MUNICIPAL SUPPLY

JW,JM,LL,CM
Report To:

CC:
04/09/2024
Jeff White
Town of Yountville
6550 Yount Street
Yountville, CA 94599
Back-Out
05/22/2024 12:32 Page 1 of 2
**Payment due NET days from Invoice Date or Prior to Release of results if COD Past Due Balances subject to a FINANCE CHARGE of 1.5% per month. *** Securely pay invoices online at CaltestLabs.com *** 1885 North Kelly Road • Napa, California 94558
(707) 258-4000 • (707) 226-1001 • e-mail: [email protected] 110.24 t5 - $2,592.00 (no mark-up)
131.08 t5 - $2,592.00 (no mark-up)
276.12 t1a - $2,592.00 (no mark-up)
Lab Services
AC - 7/3/2024
Agenda Item #10.10.

Page 301 of 383 ends

Description TAT Quantity Unit Price Total Cost
SOC Package (515/531/548/549) Standard 2 $486.00 $972.00 Sulfate, Total, by Ion Chromatography Standard 2 $57.00 $114.00 Total Dissolved Solids (TDS) Standard 2 $62.70 $125.40
Turbidity Standard 2 $41.80 $83.60
pH Standard 2 $41.80 $83.60
Total $7,776.00
Caltest Analytical Laboratory
1885 North Kelly Road
Napa, California 94558
(707) 258-4000
Please reference the invoice number on your check and remit to:

Invoice Notes
Invoice Invoice No: 719864
Invoice Date: 05/22/2024
Accounts Payable
Town of Yountville
6550 Yount St
Yountville, CA 94599
Invoice To:

NELAP/ORELAP Certification 4036 CA-ELAP Certification 1664 Received:

Lab Order:

Project:

Sampled:

Purchase Auth/PO:

Invoice Terms **: Net 30
Z050830

AG MUNICIPAL SUPPLY

JW,JM,LL,CM
Report To:

CC:
04/09/2024
Jeff White
Town of Yountville
6550 Yount Street
Yountville, CA 94599
Back-Out
05/22/2024 12:32 Page 2 of 2
**Payment due NET days from Invoice Date or Prior to Release of results if COD Past Due Balances subject to a FINANCE CHARGE of 1.5% per month. *** Securely pay invoices online at CaltestLabs.com *** 1885 North Kelly Road • Napa, California 94558
(707) 258-4000 • (707) 226-1001 • e-mail: [email protected] Agenda Item #10.10.

Page 302 of 383 ends
Page 1 of 5 ends

06 - Project Management $687.25
05 - Effluent Monitoring $.00
04 - Pollution Prevention Assistance $.00
03 - Recycled Water Permit Assistance $.00
02 - Preparation of SMRs and Annual Reports $4,842.00
01 - General Consulting $16,799.75
TOTAL AMOUNT DUE THIS INVOICE $22,329.00

TOTAL PER TASK SUMMARY
City of St. Helena
Attn: Accounts Payable
1088 College Ave.

St. Helena, CA 94574
1480 Drew Avenue, Suite 100
Davis, CA 95618
Please remit payment to
Larry Walker Associates, Inc.

November 12, 2025
Project No. - Invoice No: 00110.24-18
CITY OF ST. HELENA 2021-2022 REGULATORY ASSISTANCE
Project: 00110.24
For Services Rendered Through 10/31/2025
Agenda Item #10.10.

Page 303 of 383 ends

Project 00110.24 CITY OF ST. HELENA 2021-2022 REGULATORY ASSISTANCE Invoice 00110.24-18

Page 2 of 5 ends

VanCarpels, Tina Marie Contract Administrator 4.00 155.00 $620.00 Constantinescu, Alina Senior I .25 269.00 $67.25
Total Professional Services for 06 $687.25
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 06 $687.25
06 - Project Management
Constantinescu, Alina Senior I 18.00 269.00 $4,842.00
Total Professional Services for 02 $4,842.00
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 02 $4,842.00
02 - Preparation of SMRs and Annual Reports
Rojas Cala, Brenda Yomara Project Level I-A 9.00 202.00 $1,818.00 Mysliwiec, Mitchell Senior I .50 269.00 $134.50
Donikian, Nubia Project Level II-B 2.00 221.00 $442.00
Constantinescu, Alina Senior I 53.25 269.00 $14,324.25
Conners, Denise Helene Associate II .25 324.00 $81.00
Total Professional Services for 01 $16,799.75
Employee Title Hours Rate Amount
LWA Professional Services
Total Charges for 01 $16,799.75
01 - General Consulting
City of St. Helena
Attn: Accounts Payable
1088 College Ave.

St. Helena, CA 94574
CITY OF ST. HELENA 2021-2022 REGULATORY ASSISTANCE
Project: 00110.24
For Services Rendered Through 10/31/2025
November 12, 2025
Project No. - Invoice No: 00110.24-18
Agenda Item #10.10.

Page 304 of 383 ends

Project 00110.24 CITY OF ST. HELENA 2021-2022 REGULATORY ASSISTANCE Invoice 00110.24-18

Page 3 of 5 ends

Invoice Amount $22,329.00
$22,329.00 $204,787.75 $227,116.75 $65,371.00 ($161,745.75) Current Invoice Previously Invoiced Total Invoiced Budget Remaining Budget Billing Limits
Agenda Item #10.10.

Page 305 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 8/4/2025 Constantinescu, Alina Senior I 1.25 $ 269.00 $ 336.25 Task 1: General Consulting
8/4/2025 Constantinescu, Alina Senior I 1.25 $269.00 $ 336.25 8/5/2025 Rojas Cala, Brenda YomaraProject Level I-A 2.50 $202.00 $ 505.00 8/6/2025 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 8/6/2025 Mysliwiec, Mitchell Senior I 0.50 $269.00 $ 134.50 8/7/2025 Constantinescu, Alina Senior I 2.50 $269.00 $ 672.50 8/12/2025 Rojas Cala, Brenda YomaraProject Level I-A 3.00 $202.00 $ 606.00 8/15/2025 Constantinescu, Alina Senior I 5.50 $269.00 $ 1,479.50 8/18/2025 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 8/18/2025 Rojas Cala, Brenda YomaraProject Level I-A 1.00 $202.00 $ 202.00 8/19/2025 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 8/20/2025 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 8/21/2025 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 8/21/2025 Rojas Cala, Brenda YomaraProject Level I-A 2.50 $202.00 $ 505.00 8/22/2025 Constantinescu, Alina Senior I 5.00 $269.00 $ 1,345.00 8/25/2025 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 8/27/2025 Constantinescu, Alina Senior I 4.00 $269.00 $ 1,076.00 8/28/2025 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 8/29/2025 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 Task 1 subtotal $ 12,645.25
Task 2: Preparation of SMRs and Annual Reports
8/28/2025 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 8/29/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 1,345.00
$ 13,990.25
Task 1: General Consulting
9/17/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 9/29/2025 Donikian, Nubia Project Level II-B 2.00 $221.00 $ 442.00 Task 1 subtotal $ 576.50
Task 2: Preparation of SMRs and Annual Reports
9/24/2025 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 9/26/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 9/29/2025 Constantinescu, Alina Senior I 1.00 $269.00 $ 269.00 9/30/2025 Constantinescu, Alina Senior I 0.50 $269.00 $ 134.50 Task 2 subtotal $ 1,748.50
$ 2,325.00
As needed tasks: Prepare NPDES permit renewal packet: data compilation, research Dilution Study requirements for ROWD, RFI and call with Phil Starks about ROWD, follow-up with RWQCB on items in preissuance letter, prepare ROWD cover letter, finalize submittal and upload to RWQCB ftp site; Calls and email re: total coliform exceedance and compliance status; Research on total coliform analytical methods and emails with Nyna Horn.

August 2025 Work Effort Total
September 2025
As needed tasks: Emails on response to RWQCB WWTRP June 2025 inspection; Commence SSMP Internal Audit.

Review Alpha reports and prepare August 2025 SMR/DMR Report and Cover Letter, including quarterly WWTRP updates to the RWQCB
September 2025 Work Effort Total
Project 110.24 Regulatory Assistance
Invoice 00110.24-18 for August 2025 to October 2025 Work Effort Key for cost tables shown below:

August 2025
Review Alpha Reports and prepare July 2025 SMR/DMR Report and Cover Letter; Discussion on Dilution Study requirements for ROWD

Page 4 of 5 ends

Agenda Item #10.10.

Page 306 of 383 ends

Date Employee Name Employee Title Hours Hourly Rat Cost 8/4/2025 Constantinescu, Alina Senior I 1.25 $ 269.00 $ 336.25 Project 110.24 Regulatory Assistance
Invoice 00110.24-18 for August 2025 to October 2025 Work Effort Key for cost tables shown below:

Task 1: General Consulting
10/9/2025 Conners, Denise Helene Associate II 0.25 $324.00 $ 81.00 10/22/2025 Constantinescu, Alina Senior I 3.50 $269.00 $ 941.50 10/23/2025 Constantinescu, Alina Senior I 4.50 $269.00 $ 1,210.50 10/24/2025 Constantinescu, Alina Senior I 5.00 $269.00 $ 1,345.00 Task 1 subtotal $ 3,578.00
Task 2: Preparation of SMRs and Annual Reports
Review Alpha Lab Reports and prepare April 2023 SMR/DMR Report and Cover Letter. 10/29/2025 Constantinescu, Alina Senior I 1.50 $269.00 $ 403.50 10/30/2025 Constantinescu, Alina Senior I 5.00 $269.00 $ 1,345.00 Task 2 subtotal $ 1,748.50
Task 6: Project Management
Project team coordination, timesheet reviews for invoicing. 10/27/2025 Constantinescu, Alina Senior I 0.25 $269.00 $ 67.25 10/31/2025 VanCarpels, Tina Marie Contract Administrator 4.00 $155.00 $ 620.00 Task 6 subtotal $ 687.25
$ 6,013.75
Total for Invoice 00110.24-17 $ 22,329.00
As needed tasks: Discussion re: status of WWTRP upgrades; CIWQS SSO data review and draft SSMP Internal Audit; Review Alpha lab reports and prepare September 2025 SMR/DMR Report and Cover Letter.

October 2025
October 2025 Work Effort Total

Page 5 of 5 ends

Agenda Item #10.10.

Page 307 of 383 ends

CITY OF ST. HELENA
RESOLUTION NO. 2025-__

RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE

A PROFESSIONAL SERVICES AGREEMENT WITH LARRY

WALKER ASSOCIATES FOR WASTEWATER AND

GROUNDWATER REGULATORY ASSISTANCE THROUGH JUNE
30, 2027 FOR A TOTAL NOT-TO-EXCEED $160,700.

RECITALS
A. Larry Walker Associates (LWA) has provided ongoing wastewater and groundwater regulatory compliance services for the City of St. Helena since 2017; and
B. The City continues to require specialized technical, regulatory, sampling, monitoring, and reporting support to maintain compliance with the State Water Resources Control Board and the San Francisco Bay Regional Water Quality Control Board; and
C. LWA has submitted a proposed Scope of Services for FY2025-26 through FY2026-27, encompassing Self-Monitoring Reports, groundwater monitoring, Pollution Prevention Program updates, NPDES permit renewal assistance, SSMP updates, and other required regulatory tasks; and
D. Funding for the proposed Professional Services Agreement is available within the Public Works Administration operating budget for Fy2025-26 and FY2026-27, and no budget amendment is required at this time; and
E. It is in the best interest of the City to authorize the execution of this Agreement to ensure the continuity of essential regulatory compliance activities.

RESOLUTION
NOW, THEREFORE, the City Council of the City of St. Helena resolves as follows:

1. Authorizes the City Manager to execute a Professional Services Agreement with Larry Walker Associates for wastewater and groundwater regulatory assistance through June 30, 2027, for a total not-to-exceed amount of $160,700.

Agenda Item #10.10.

Page 308 of 383 ends

2. Funding is as follows:

Description Fund/Funding
Source
Expense
GL Account
Amount
PW Admin – FY26
Professional Contracts
571 – Wastewater
Enterprise 571-5000-2130 $80,350
PW Admin – FY27
Professional Contracts
571 – Wastewater
Enterprise 571-5000-2130 $80,350
Approved at a Regular Meeting of the St. Helena City Council on November 25, 2025, by the following vote:

Mayor Dohring:

Vice Mayor Deasy:

Council Member Barak:

Council Member Spadarotto:

Council Member Summers:

APPROVED: ATTEST:
________________________ ________________________
Paul Jamison Dohring, Mayor Andrew Bradley, City Clerk
Agenda Item #10.10.

Page 309 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 1 CITY OF ST. HELENA

PROFESSIONAL SERVICES AGREEMENT
WASTEWATER REGULATORY ASSISTANCE FY2025-26 THROUGH FY2026-27 This Agreement is made and entered into as of November 18, 2025 by and between the City of St. Helena, a public agency organized and operating under the laws of the State of California (“City”), and Larry Walker Associates, Inc. with its principal place of business at 2246 Sixth Street, Berkeley, CA 94710 (hereinafter referred to as “Consultant”). City and Consultant are sometimes individually referred to as “Party” and collectively as “Parties” in this Agreement.

RECITALS
A. City is a public agency of the State of California and is in need of professional services for the following project:

Wastewater Regulatory Assistance FY2025-26 through FY2026-17 (hereinafter referred to as “the Project”).

B. Consultant is duly licensed and has the necessary qualifications to provide such services.

C. The Parties desire by this Agreement to establish the terms for City to retain Consultant to provide the services described herein.

AGREEMENT
NOW, THEREFORE, IT IS AGREED AS FOLLOWS:

1. Services.

Consultant shall provide the City with the services described in the Scope of Services attached hereto as Exhibit “A.”

2. Compensation.
a. Subject to paragraph 2(b) below, the City shall pay for such services in accordance with the Schedule of Charges set forth in Exhibit “A.” b. In no event shall the total amount paid for services rendered by Consultant under this Agreement exceed the sum of $160,700. This amount is to cover all printing and related costs, and the City will not pay any additional fees for printing expenses. Periodic payments shall be made within 30 days of receipt of an invoice which includes a detailed description of the work performed. Payments to Consultant for work performed will be made on a monthly billing basis.

3. Additional Work.

If changes in the work seem merited by Consultant or the City, and informal consultations with the other party indicate that a change is warranted, it shall be processed in the following manner: a letter outlining the changes shall be forwarded to the City by Consultant with a statement of estimated changes in fee or time schedule. An amendment to this Agreement shall Agenda Item #10.10.

Page 310 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 2 be prepared by the City and executed by both Parties before performance of such services, or the City will not be required to pay for the changes in the scope of work. Such amendment shall not render ineffective or invalidate unaffected portions of this Agreement.

4. Maintenance of Records.

Books, documents, papers, accounting records, and other evidence pertaining to costs incurred shall be maintained by Consultant and made available at all reasonable times during the contract period and for four (4) years from the date of final payment under the contract for inspection by City.

5. Term.

The term of this Agreement shall be from November 1, 2025 to June 30, 2027, unless earlier terminated as provided herein. The Parties may, by mutual, written consent, extend the term of this Agreement if necessary to complete the Project. Consultant shall perform its services in a prompt and timely manner within the term of this Agreement and shall commence performance upon receipt of written notice from the City to proceed (“Notice to Proceed”). The Notice to Proceed shall set forth the date of commencement of work.

6. Delays in Performance.
a. Neither City nor Consultant shall be considered in default of this Agreement for delays in performance caused by circumstances beyond the reasonable control of the nonperforming party. For purposes of this Agreement, such circumstances include but are not limited to, abnormal weather conditions; floods; earthquakes; fire; epidemics; pandemics; war; riots and other civil disturbances; strikes, lockouts, work slowdowns, and other labor disturbances; sabotage or judicial restraint.
b. Should such circumstances occur, the non-performing party shall, within a reasonable time of being prevented from performing, give written notice to the other party describing the circumstances preventing continued performance and the efforts being made to resume performance of this Agreement.

7. Compliance with Law.
a. Consultant shall comply with all applicable laws, ordinances, codes and regulations of the federal, state and local government, including Cal/OSHA requirements. b. If required, Consultant shall assist the City, as requested, in obtaining and maintaining all permits required of Consultant by federal, state and local regulatory agencies. c. If applicable, Consultant is responsible for all costs of clean up and/ or removal of hazardous and toxic substances spilled as a result of his or her services or operations performed under this Agreement.

8. Standard of Care; Performance of Employees
Agenda Item #10.10.

Page 311 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 3 a. Consultant’s services will be performed in accordance with generally accepted professional practices and principles and in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions. b. Consultant’s employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them. Consultant represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Contract. As provided for in the indemnification provisions of this Contract, Consultant shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Consultant’s failure to comply with the standard of care provided for herein. Any employee of the Consultant or its sub-consultants who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner acceptable to the City, shall be promptly removed from the Project by the Consultant and shall not be re-employed to perform any of the Services or to work on the Project.

9. Assignment and Subcontracting
Consultant shall not assign, sublet, or transfer this Agreement or any rights under or interest in this Agreement without the written consent of the City, which may be withheld for any reason. Any attempt to so assign or so transfer without such consent shall be void and without legal effect and shall constitute grounds for termination. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement. Nothing contained herein shall prevent Consultant from employing independent associates and subcontractors as Consultant may deem appropriate to assist in the performance of services hereunder.

10. Independent Contractor
Consultant is retained as an independent contractor and is not an employee of City. No employee or agent of Consultant shall become an employee of City. The work to be performed shall be in accordance with the work described in this Agreement, subject to such directions and amendments from City as herein provided.

11. Insurance. Consultant shall not commence work for the City until it has provided evidence satisfactory to the City it has secured all insurance required under this section. In addition, Consultant shall not allow any subcontractor to commence work on any subcontract until it has secured all insurance required under this section. a. Commercial General Liability
(i) The Consultant shall take out and maintain, during the performance of all work under this Agreement, in amounts not less than specified herein, Commercial General Liability Insurance, in a form and with insurance companies acceptable to the City. (ii) Coverage for Commercial General Liability insurance shall be at least as broad as the following:

Agenda Item #10.10.

Page 312 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 4 (1) Insurance Services Office Commercial General Liability coverage (Occurrence Form CG 00 01) or exact equivalent. (iii) Commercial General Liability Insurance must include coverage for the following:
(1) Bodily Injury and Property Damage
(2) Personal Injury/Advertising Injury
(3) Premises/Operations Liability
(4) Products/Completed Operations Liability
(5) Aggregate Limits that Apply per Project
(6) Explosion, Collapse and Underground (UCX) exclusion deleted
(7) Contractual Liability with respect to this Agreement (8) Property Damage
(9) Independent Contractors Coverage
(iv) The policy shall contain no endorsements or provisions limiting coverage for (1) contractual liability; (2) cross liability exclusion for claims or suits by one insured against another; (3) products/completed operations liability; or (4) contain any other exclusion contrary to the Agreement.
(v) The policy shall give City, its officials, officers, employees, agents and City designated volunteers additional insured status using ISO endorsement forms CG 20 10 10 01 and 20 37 10 01, or endorsements providing the exact same coverage. (vi) The general liability program may utilize either deductibles or provide coverage excess of a self-insured retention, subject to written approval by the City, and provided that such deductibles shall not apply to the City as an additional insured. b. Automobile Liability
(i) At all times during the performance of the work under this Agreement, the Consultant shall maintain Automobile Liability Insurance for bodily injury and property damage including coverage for owned, non-owned and hired vehicles, in a form and with insurance companies acceptable to the City.
(ii) Coverage for automobile liability insurance shall be at least as broad as Insurance Services Office Form Number CA 00 01 covering automobile liability (Coverage Symbol 1, any auto).
(iii) The policy shall give City, its officials, officers, employees, agents and City designated volunteers additional insured status. (iv) Subject to written approval by the City, the automobile liability program may utilize deductibles, provided that such deductibles shall not apply to the City as an additional insured, but not a self-insured retention.
c. Workers’ Compensation/Employer’s Liability
Agenda Item #10.10.

Page 313 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 5 (i) Consultant certifies that he/she is aware of the provisions of Section 3700 of the California Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and he/she will comply with such provisions before commencing work under this Agreement.
(ii) To the extent Consultant has employees at any time during the term of this Agreement, at all times during the performance of the work under this Agreement, the Consultant shall maintain full compensation insurance for all persons employed directly by him/her to carry out the work contemplated under this Agreement, all in accordance with the “Workers’ Compensation and Insurance Act,” Division IV of the Labor Code of the State of California and any acts amendatory thereof, and Employer’s Liability Coverage in amounts indicated herein. Consultant shall require all subconsultants to obtain and maintain, for the period required by this Agreement, workers’ compensation coverage of the same type and limits as specified in this section.
d. Professional Liability (Errors and Omissions)
At all times during the performance of the work under this Agreement the Consultant shall maintain professional liability or Errors and Omissions insurance appropriate to its profession, in a form and with insurance companies acceptable to the City and in an amount indicated herein.

This insurance shall be endorsed to include contractual liability applicable to this Agreement and shall be written on a policy form specifically designed to protect against acts, errors or omissions of the Consultant. “Covered Professional Services” as designated in the policy must specifically include work performed under this Agreement. The policy must “pay on behalf of” the insured and must include a provision establishing the insurer's duty to defend. e. Minimum Policy Limits Required
(i) The following insurance limits are required for the Agreement:

Combined Single Limit
Commercial General Liability $1,000,000 per occurrence/ $2,000,000 aggregate for bodily injury, personal injury, and property
damage
Automobile Liability $1,000,000 combined single limit
Employer’s Liability $1,000,000 per accident or disease Professional Liability $1,000,000 per claim and aggregate (errors and omissions)
(ii) Defense costs shall be payable in addition to the limits. (iii) Requirements of specific coverage or limits contained in this section are not intended as a limitation on coverage, limits, or other requirement, or a waiver of any coverage normally provided by any insurance. Any available coverage shall be provided to the parties required to be named as Additional Insured pursuant to this Agreement.

Agenda Item #10.10.

Page 314 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 6 f. Evidence Required
Prior to execution of the Agreement, the Consultant shall file with the City evidence of insurance from an insurer or insurers certifying to the coverage of all insurance required herein. Such evidence shall include original copies of the ISO CG 00 01 (or insurer’s equivalent) signed by the insurer’s representative and Certificate of Insurance (Acord Form 25-S or equivalent), together with required endorsements. All evidence of insurance shall be signed by a properly authorized officer, agent, or qualified representative of the insurer and shall certify the names of the insured, any additional insureds, where appropriate, the type and amount of the insurance, the location and operations to which the insurance applies, and the expiration date of such insurance.
g. Policy Provisions Required
(i) Consultant shall provide the City at least thirty (30) days prior written notice of cancellation of any policy required by this Agreement, except that the Consultant shall provide at least ten (10) days prior written notice of cancellation of any such policy due to non-payment of premium. If any of the required coverage is cancelled or expires during the term of this Agreement, the Consultant shall deliver renewal certificate(s) including the General Liability Additional Insured Endorsement to the City at least ten (10) days prior to the effective date of cancellation or expiration.
(ii) The Commercial General Liability Policy and Automobile Policy shall each contain a provision stating that Consultant’s policy is primary insurance and that any insurance, self-insurance or other coverage maintained by the City or any named insureds shall not be called upon to contribute to any loss.
(iii) The retroactive date (if any) of each policy is to be no later than the effective date of this Agreement. Consultant shall maintain such coverage continuously for a period of at least three years after the completion of the work under this Agreement. Consultant shall purchase a one (1) year extended reporting period A) if the retroactive date is advanced past the effective date of this Agreement; B) if the policy is cancelled or not renewed; or C) if the policy is replaced by another claims-made policy with a retroactive date subsequent to the effective date of this Agreement.
(iv) All required insurance coverages, except for the professional liability coverage, shall contain or be endorsed to provide a waiver of subrogation in favor of the City, its officials, officers, employees, agents, and volunteers or shall specifically allow Consultant or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. Consultant hereby waives its own right of recovery against City, and shall require similar written express waivers and insurance clauses from each of its subconsultants.
(v) The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability.

Further the limits set forth herein shall not be construed to relieve the Consultant from liability in excess of such coverage, nor shall it limit the Consultant’s indemnification obligations to the City and shall not preclude the City from taking such other actions available to the City under other provisions of the Agreement or law.
h. Qualifying Insurers
Agenda Item #10.10.

Page 315 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 7 (i) All policies required shall be issued by acceptable insurance companies, as determined by the City, which satisfy the following minimum requirements:
(1) Each such policy shall be from a company or companies with a current A.M. Best's rating of no less than A:VII and admitted to transact in the business of insurance in the State of California, or otherwise allowed to place insurance through surplus line brokers under applicable provisions of the California Insurance Code or any federal law.
i. Additional Insurance Provisions
(i) The foregoing requirements as to the types and limits of insurance coverage to be maintained by Consultant, and any approval of said insurance by the City, is not intended to and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Consultant pursuant to this Agreement, including but not limited to, the provisions concerning indemnification.
(ii) If at any time during the life of the Agreement, any policy of insurance required under this Agreement does not comply with these specifications or is canceled and not replaced, City has the right but not the duty to obtain the insurance it deems necessary and any premium paid by City will be promptly reimbursed by Consultant or City will withhold amounts sufficient to pay premium from Consultant payments. In the alternative, City may cancel this Agreement.
(iii) The City may require the Consultant to provide complete copies of all insurance policies in effect for the duration of the Project. (iv) Neither the City nor any of its officials, officers, employees, agents or volunteers shall be personally responsible for any liability arising under or by virtue of this Agreement.
j. Subconsultant Insurance Requirements. Consultant shall not allow any subcontractors or subconsultants to commence work on any subcontract until they have provided evidence satisfactory to the City that they have secured all insurance required under this section.

Policies of commercial general liability insurance provided by such subcontractors or subconsultants shall be endorsed to name the City as an additional insured using ISO form CG 20 38 04 13 or an endorsement providing the exact same coverage. If requested by Consultant, City may approve different scopes or minimum limits of insurance for particular subcontractors or subconsultants.

12. Indemnification.
a. To the fullest extent permitted by law, Consultant shall defend (with counsel of City’s choosing), indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining to, or incident to any acts, errors or omissions, or willful misconduct of Consultant, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Consultant’s services, the Project or this Agreement, including without limitation the payment of all damages, expert witness fees and attorney’s fees and other related costs and expenses. Consultant's obligation to indemnify Agenda Item #10.10.

Page 316 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 8 shall not be restricted to insurance proceeds, if any, received by Consultant, the City, its officials, officers, employees, agents, or volunteers.
b. If Consultant’s obligation to defend, indemnify, and/or hold harmless arises out of Consultant’s performance of “design professional” services (as that term is defined under Civil Code section 2782.8), then, and only to the extent required by Civil Code section 2782.8, which is fully incorporated herein, Consultant’s indemnification obligation shall be limited to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant, and, upon Consultant obtaining a final adjudication by a court of competent jurisdiction, Consultant’s liability for such claim, including the cost to defend, shall not exceed the Consultant’s proportionate percentage of fault.

13. California Labor Code Requirements.
a. Consultant is aware of the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects (“Prevailing Wage Laws”). If the services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It shall be mandatory upon the Consultant and all subconsultants to comply with all California Labor Code provisions, which include but are not limited to prevailing wages (Labor Code Sections 1771, 1774 and 1775), employment of apprentices (Labor Code Section 1777.5), certified payroll records (Labor Code Sections 1771.4 and 1776), hours of labor (Labor Code Sections 1813 and 1815) and debarment of contractors and subcontractors (Labor Code Section 1777.1). The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4. b. If the services are being performed as part of an applicable “public works” or “maintenance” project, then pursuant to Labor Code Sections 1725.5 and 1771.1, the Consultant and all subconsultants performing such services must be registered with the Department of Industrial Relations. Consultant shall maintain registration for the duration of the Project and require the same of any subconsultants, as applicable. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1. c. This Agreement may also be subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be Consultant’s sole responsibility to comply with all applicable registration and labor compliance requirements. Any stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor that affect Consultant’s performance of services, including any delay, shall be Consultant’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Consultant caused delay and shall not be compensable by the City. Consultant shall defend, indemnify and hold the City, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Consultant or any subcontractor.

Agenda Item #10.10.

Page 317 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 9 14. Safety.

Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and life-saving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.

15. Verification of Employment Eligibility.

By executing this Agreement, Consultant verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subconsultants and sub-subconsultants to comply with the same.

16. INTENTIONALLY DELETED

17. Laws and Venue.

This Agreement shall be interpreted in accordance with the laws of the State of California.

If any action is brought to interpret or enforce any term of this Agreement, the action shall be brought in a the Superior Court of California for the County of Napa.

18. Termination or Abandonment
a. City has the right to terminate or abandon any portion or all of the work under this Agreement by giving ten (10) calendar days written notice to Consultant. In such event, City shall be immediately given title and possession to all original field notes, drawings and specifications, written reports and other documents produced or developed for that portion of the work completed and/or being abandoned. City shall pay Consultant the reasonable value of services rendered for any portion of the work completed prior to termination. If said termination occurs prior to completion of any task for the Project for which a payment request has not been received, the charge for services performed during such task shall be the reasonable value of such services, based on an amount mutually agreed to by City and Consultant of the portion of such task completed but not paid prior to said termination. City shall not be liable for any costs other than the charges or portions thereof which are specified herein. Consultant shall not be entitled to payment for unperformed services, and shall not be entitled to damages or compensation for termination of work.
b. Consultant may terminate its obligation to provide further services under this Agreement upon thirty (30) calendar days’ written notice to City only in the event of substantial failure by City to perform in accordance with the terms of this Agreement through no fault of Consultant.

Agenda Item #10.10.

Page 318 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 10 19. Ownership of Documents and Confidential Information. a. All deliverables and other documents generated by Consultant in the performance of the Services, including all work papers, work-in-progress, designs, drawings, documents, data, computations, specifications, studies and reports prepared by Consultant as a part of the Services or authorized Additional Services (“Consultant Work Product”) shall belong to and be subject to the sole ownership and use of City. b. Except as otherwise provided in “Termination or Abandonment,” above, all original field notes, written reports, drawings and specifications and other documents, produced or developed for the Project shall, upon payment in full for the services described in this Agreement, be furnished to and become the property of the City. c. During the course of the performance of this Agreement, Consultant may receive written or verbal information from City, its representatives or agents, not in the public domain. Such information may include City’s know how, trade secrets, and other proprietary and confidential information and Consultant agrees to treat such information as confidential information belonging to City. Consultant agrees that neither it, nor its officers, employees, representatives, agents, successors, or assigns, will disclose such information to any third party or use the same in any manner without the prior written consent of City. Moreover, Consultant agrees to safeguard such proprietary and confidential information from unauthorized disclosure and/or use using the same degree of care it uses to protect its own proprietary and confidential information, but not less than a reasonable standard of care. In the event that disclosure of such information is sought pursuant to any law or regulation, Consultant shall promptly notify City of such fact to allow City to assert whatever exclusions or exemptions may be available to it under applicable law or regulation.

20. Organization
Consultant shall assign Alina Constantinescu as Project Manager. The Project Manager shall not be removed from the Project or reassigned without the prior written consent of the City.

21. Limitation of Agreement.

This Agreement is limited to and includes only the work included in the Project described above.

22. Notice
Any notice or instrument required to be given or delivered by this Agreement may be given or delivered by depositing the same in any United States Post Office, certified mail, return receipt requested, postage prepaid, addressed to:

CITY:

City of St. Helena
1088 College Ave. St. Helena, CA 94574
Attn: Joseph Leach, Public Works Director
CONSULTANT:

Larry Walker Associates
2246 Sixth Street
Berkeley, CA 94710
and shall be effective upon receipt thereof.

Agenda Item #10.10.

Page 319 of 383 ends

Larry Walker Associates/Wastewater Regulatory Assistance FY2025/26 through FY2026/27 11 23. Third Party Rights
Nothing in this Agreement shall be construed to give any rights or benefits to anyone other than the City and the Consultant.

24. Equal Opportunity Employment.

Consultant represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

25. Entire Agreement
This Agreement, with its exhibits, represents the entire understanding of City and Consultant as to those matters contained herein, and supersedes and cancels any prior or contemporaneous oral or written understanding, promises or representations with respect to those matters covered hereunder. Each Party acknowledges that no representations, inducements, promises or agreements have been made by any person which are not incorporated herein, and that any other agreements shall be void. This Agreement may not be modified or altered except in writing signed by both Parties hereto. This is an integrated Agreement.

26. Severability
The unenforceability, invalidity or illegality of any provision(s) of this Agreement shall not render the remaining provisions unenforceable, invalid or illegal.

27. Successors and Assigns
This Agreement shall be binding upon and shall inure to the benefit of the successors in interest, executors, administrators and assigns of each Party to this Agreement. However, Consultant shall not assign or transfer by operation of law or otherwise any or all of its rights, burdens, duties or obligations without the prior written consent of City. Any attempted assignment without such consent shall be invalid and void.

28. Non-Waiver
None of the provisions of this Agreement shall be considered waived by either Party, unless such waiver is specifically specified in writing.

29. Time of Essence
Time is of the essence for each and every provision of this Agreement.

30. City’s Right to Employ Other Consultants
City reserves its right to employ other consultants, including engineers, in connection with this Project or other projects.

Agenda Item #10.10.