Attachment C
CURRENT
CITY OF SAN DIEGO, CALIFORNIA
COUNCIL POLICY
2. Draft and submit recommended naming opportunities with gift levels to the Department Director for review.
3. Upon receipt of recommended naming opportunities with gift levels,the Department Director reviewing the recommendation will consider the following items in the review, including, but not limited to, the following:
a. Submit the request to appropriate City historical staff to review the City’s CHRID to determine if the City Asset is a Designated Historical Resource with an assigned historic name;
b. Ensure that supporting information has been authenticated; c. If the City Asset is a Designated Historical Resource listed on the local, State or
National Register of Historic Places, any on-site recognition shall comply with the
U.S. Secretary of the Interior’s Standards for the Treatment of Historic Properties and
shall be reviewed and approved by the City’s Historical Resources staff according to
those standards;
d. Ensure compliance with Charter section 225 (Mandatory Disclosure of Business Interests);
e. Consider the community impact;
f. Consider the impact of the donation or funding to the completion of a project, if applicable; and
g. Consider the cost of implementation and signage, and identify the funding to cover such costs.
4. The Department Director will submit the proposal to the City Attorney’s Office for legal review of the following issues that include, but are not limited to:
a. Ownership rights, by agreement or by law; and
b. Adherence to City policies, such as the San Diego Charter and SDMC, as well as any local, state, or federal regulation.
5. Upon completion of the above steps, the Department Director will work with the
City Attorney to prepare a draft agreement with the City Sponsored or Recognized
Support Group.
CP-900-20
Attachment C
CURRENT
CITY OF SAN DIEGO, CALIFORNIA
COUNCIL POLICY
6. Upon approval by the Department Director, the City Sponsored or Recognized
Support Group will submit the recommended naming or renaming opportunities with gift levels and draft agreement to the corresponding board or commission.
7. Upon approval by the board or commission, the Department Director will submit the final draft recommendation on the naming or renaming opportunities with gift levels along with the draft agreement to the City Council for final approval. Only after City Council approval may the City Sponsored or Recognized Support Groups begin soliciting and accepting donations for naming or renaming rights.
8. No final commitment to name a City Asset or portion thereof shall be made to a potential donor without the final approval by the Department Director and Assistant Chief Operating Officer or Chief Operating Officer. Naming or renaming rights that
include funding will have final approval by City Council.
HISTORY:
“Naming of City Assets”
Adopted by Resolution R-311043 – 04/13/2017
CP-900-20
Attachment C
City of San José, California
COUNCIL POLICY
TITLE NAMING OF CITY-OWNED LAND
AND FACILITIES
PAGE
1 of 5
POLICY NUMBER
7-5
EFFECTIVE DATE April 24, 1972 REVISED DATE June 8, 2010 APPROVED BY COUNCIL ACTION 4/24/72; 11/03/92, Item 9c; 11/23/93, Item 7(b)(6)(d); 6/8/2010, Item 2.18, Res. No. 75393;
The City of San José has a naming policy to guide the naming of public land and facilities. This revision updates the criteria and process to be used in considering the naming or renaming of public land and facilities, other than City streets, which is covered in City Council Policy 6-5.
PURPOSE
To establish Council policy regarding the determination of names to be given to City-owned land and facilities that are not City streets.
POLICY
It is the policy of the City of San José to determine names for City-owned land and facilities after following the procedures set forth herein.
It is the Policy of the City of San José to encourage:
1. Naming which reflects the City's ethnic and cultural diversity;
2. Recognition of distinct geographic, environmental or developmental features, or names of historical significance in naming City lands and facilities;
3. Recognition of individuals who have made a significant contribution to San José, the State, the Nation or the World;
4. Naming as early in the capital planning and development process as possible; and
5. Sponsorship through significant funding support from private donors for the construction and/or ongoing maintenance and operations of City lands and facilities in exchange for naming options. The minimum sponsorship or donation amount necessary to achieve the level of significant sponsorship or donation shall be determined by the responsible Department’s Fundraising and Sponsorship guideline1
as approved by the City Manager,
unless otherwise approved by City Council.
BACKGROUND
The City Council of the City of San José is responsible for the naming of City-owned land and facilities. From time to time, the public desires to have City-owned land and facilities such as parks, athletic fields, the airport and golf courses, be named after venerated individuals, geographic features, or prominent organizations. Furthermore, the policy creates opportunities for the City to attract potential donors and sponsors who contribute significant funds to assist
TITLE NAMING OF CITY-OWNED LAND
AND FACILITIES
PAGE
2 of 5
POLICY NUMBER
7-5
the City in construction, maintenance, or operations of City lands and facilities, in exchange for naming rights.
IMPLEMENTATION GUIDELINES
GENERAL PROVISIONS
I. ESTABLISHMENT OF A NEW NAME FOR CITY-OWNED LAND AND FACILITIES
1. A public hearing by the appropriate Commission or Council Committee shall be held in order for the proper body and responsible Department to develop a recommendation to the City Council.
2. Potential names shall be considered if reflective of at least one of the following criteria:
a. Geographic location
b. Prominent geographic feature or local reference point c. Adjoining subdivision/community
d. Historical event
e. A deceased individual (see criteria below)
f. An individual via a donation or sponsorship agreement g. A group via a donation or sponsorship agreement
3. Consideration shall be given to the naming of City-Owned land and facilities after an individual only if one of the following criteria has been met:
a. The individual has been deceased for at least 5 years, and made significant contributions to the City through a long-term commitment to providing benefit to the residents and visitors to San José.
b. The individual has been deceased for at least 5 years, and made significant contributions to the State, the Nation or to the World through a long-term commitment to providing benefits to others, and the results of these efforts have also provided significant benefits to San Jose’s residents and visitors. c. A donation or sponsorship from an individual, deceased or living, of a significant level (as determined by the appropriate Department’s City Manager approved Fundraising and Sponsorship Guidelines consistent with this Policy)) has been accepted by the City in exchange for naming City property or facility after the individual.
4. This Policy is intended to apply to the naming of City lands such as entire parks or other City facilities that are more substantial than an “amenity” (as defined in Other General Provisions #3 below) and requires City Council approval in conformance with this policy.
Any capital campaign materials and all Fundraising and Sponsorship Guidelines shall indicate that no naming rights may be granted and the City shall not be obligated to name land, parks or any other facility that is more substantial than an amenity,
TITLE NAMING OF CITY-OWNED LAND
AND FACILITIES
PAGE
3 of 5
POLICY NUMBER
7-5
notwithstanding any payment to the City, unless and until City Council has approved the naming of the land or facility pursuant to this Policy.
II. DONATION AND SPONSORSHIP
1. Consideration shall be given to the naming of City-owned land and facilities to a living individual, a group or private entity through a donation or sponsorship, only if one of the following criteria has been met:
a. The land or the money for its purchase has been donated for the benefit of the individual, group or entity.
b. A substantial financial contribution to the City (as determined consistent with this Policy) for the improvement, upkeep or operation of the land or facility has been provided to the City in exchange for the naming of the land or facility.
1.b.1. The contribution amount must be in alignment with the responsible Department’s Fundraising and Sponsorship Guidelines as stated in Council Policy 1-17.
III. RENAMING OF CITY-OWNED LAND AND FACILITIES
1. It is the policy of the City to retain long-standing names of City-owned land and facilities unless the following criteria has been met:
a. An individual, group, or private company has made a substantial contribution to the City for the acquisition, improvement, upkeep, or operation of the land or a facility, and in accordance with City Council Policy 1-17 and pursuant to a Department’s approved Fundraising and Sponsorship Guidelines, unless otherwise approved by City Council. b. Even if funds are offered in exchange for naming rights, staff shall make reasonable efforts to have the donor or sponsor agree to incorporate the existing name into a newly recommended name while still acknowledging the funding support of the donor or sponsors. An example of this proposal would be “Dr. Roberto Cruz, Alum Rock Library”. Nothing herein limits the requirement of City Council approval for naming rights pursuant to this policy.
IV. OTHER GENERAL PROVISIONS
1. The San José Municipal Code established limits upon the City Managers’ contracting authority in Chapter 4.04 of the San José Municipal Code, as it may be amended from time to time.
2. The naming of interior rooms of City-owned facilities, smaller areas within a park, and other “amenities” on City-owned land will not be required to follow this Policy but may be named subject to the City Manager’s approval.
TITLE NAMING OF CITY-OWNED LAND
AND FACILITIES
PAGE
4 of 5
POLICY NUMBER
7-5
3. An “amenity” is an improvement located on identifiable City property such as a wall on a park, a plaza in front of a City building, a trail located along City property, an interior room or rooms in a building. A fully enclosed structure such as a City building with walls and roof (examples being community center, stand-alone gym, a warehouse, or stand-alone building housing a restroom and locker room) is more substantial than an amenity and City Council approval is required before granting naming rights. An amenity may include the following if located on City property: plazas located that constitute only a portion of a larger parcel City property, gazebos, archways, paths, athletic facilities that are not enclosed structures or stand-alone City buildings, picnic areas, tot lots, play structures, hard courts, and trail segments. If the administration is unsure if a specific City improvement is an amenity or more substantial than an amenity, the City Manager shall seek direction from the City Council Rules Committee.
4. Guidelines for amenities and interior naming opportunities is a part of the Department’s internal Fundraising and Sponsorship guidelines as referenced in City Policy 1-17. 2
5. The staff of the Department overseeing the consideration of the naming rights will ensure that implementation of this policy does not conflict with existing Municipal Code provisions or existing City policy.
a. These could include, but are not limited to, Chapter 4.04 of the San José Municipal Code, Donation, Sponsorship, and Fundraising Guidelines (Policy 1-17), the Code of Ethics (Policy 0-15), the City's Zoning Code (Title 20 of the SJ Municipal Code) and Sign Ordinance (Title 23 of the SJ Municipal Code), City procurement requirements, the Prevailing Wage and Living Wage Policies, Uses of Public Property (Policy 6-16), the California Environmental Quality Act, and the Long-Term Use of City Parklands for Private Enterprise Purposes (Policy 7-8).
V. THE NOMINATION PROCESS
All requests to City Council, including those developed by City or Agency Staff, for naming or renaming of City-owned lands and facilities must be submitted to the City Clerk and contain detailed justification for the request, except for names that are put forward at the public hearings held by the applicable Commission, Council Committee, or City Council.
1. Any person may recommend a name by submitting a written request to the Office of the City Clerk.
a. The proposal will provide the minimum of information contained on the form provided by the City Clerk.
2. The City Clerk will transmit the form and supporting documents to the proper Commission, Council Committee, and Department for review and, if deemed appropriate and consistent with this Policy, the scheduling of a public hearing before a recommendation is made to the Council. If it is unclear which Commission or Council Committee would be appropriate for review, the naming request shall be made to the City Council Rules Committee.
TITLE NAMING OF CITY-OWNED LAND
AND FACILITIES
PAGE
5 of 5
POLICY NUMBER
7-5
a. The request for consideration of a new name or renaming for City land or City facility shall follow all appropriate public noticing regulations for the identified Commission or Council Committee.
b. The Department shall make a determination of appropriate action based on this Policy and its approved Sponsorship Guidelines.
2.b.1. Department staff will prepare a report and recommendation to the appropriate Commission or Committee and a subsequent memo for City Council approval addressing the Department’s and the Commission’s recommendation on a proposed City-owned land or facility naming and renaming. The report shall include a Net Benefit Analysis that includes an evaluation of factors such as:
proposed length of sponsorship opportunity; the cost of sponsorship; and the ratio of the funding provided by the proposed donation or sponsorship to the costs of acquisition, construction, ongoing facility operations and maintenance; current market factors; and alignment to the Department’s Fundraising and Sponsorship Guidelines and business plans.
3. Any person may speak at the public hearing on the proposed name and may suggest one or more new names for the City property.
4. After action has been taken on the nomination by the appropriate Commission or Council Committee, the recommendation will be sent back to the City Clerk to be placed on the City Council agenda.
5. The Clerk will notify the petitioner of the date for Council consideration and/or the subsequent action by City Council.
1 As required in Council Policy 1-17 (Donation, Sponsorship and Fundraising Guidelines) 2 Staff in the respective department will work with City Attorney's Office in order to determine the restrictions, including without limitation federal tax law restrictions related to naming opportunities. Assuming that it is determined that naming opportunities may proceed, the Department may include a list of the significant interior naming opportunities and naming opportunities of other “Amenities” and corresponding sponsorship or giving levels. Interior naming opportunities may also be offered at existing facilities. The respective Department Head will submit the list of naming opportunities to the City Manager, for approval.
CITY OF STANTON
REPORT TO CITY COUNCIL
TO: Honorable Mayor and Members of the City Council
DATE: June 24, 2025
SUBJECT: RESOLUTION NO. 2025-28, CONCERNING (1) ADOPTION OF A
MITIGATED NEGATIVE DECLARATION AND A MITIGATION
MONITORING AND REPORTING PROGRAM FOR THE NORM ROSS
SPORTS PARK IMPROVEMENT PROJECT PURSUANT TO THE
CALIFORNIA ENVIRONMENTAL QUALITY ACT; (2) APPROVAL OF
THE JOINT USE LEASE AGREEMENT BETWEEN THE CITY OF
STANTON AND THE GARDEN GROVE UNIFIED SCHOOL DISTRICT
FOR THE NORM ROSS SPORTS PARK IMPROVEMENT PROJECT;
AND (3) APPROVAL OF THE CONCEPTUAL SITE PLAN FOR THE
NORM ROSS SPORTS PARK IMPROVEMENT PROJECT
REPORT IN BRIEF:
The City of Stanton seeks (1) City Council adoption of a Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program for the Norm Ross Sports Park Improvement Project pursuant to the California Environmental Quality Act; (2) approval of a Joint Use Lease Agreement with the Garden Grove Unified School District to facilitate the Project, a community recreational development funded by California State Grant Funds; and (3) approval of the conceptual site plan for the Project.
RECOMMENDED ACTION:
1. City Council adopt the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program for the Project pursuant to the California Environmental Quality Act; and
2. Adopt Resolution No. 2025-28, entitled:
“A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF STANTON, CALIFORNIA, (1) ADOPTING A MITIGATED NEGATIVE DECLARATION
AND A MITIGATION MONITORING AND REPORTING PROGRAM FOR
THE NORM ROSS SPORTS PARK IMPROVEMENT PROJECT
PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT; (2)
APPROVING THE JOINT USE LEASE AGREEMENT BETWEEN THE CITY
OF STANTON AND THE GARDEN GROVE UNIFIED SCHOOL DISTRICT FOR THE NORM ROSS SPORTS PARK IMPROVEMENT PROJECT; AND
Item: 12B
Click here to return to the agenda.
2 (3) APPROVING CONCEPTUAL SITE PLAN FOR THE NORM ROSS
SPORTS PARK IMPROVEMENT PROJECT”; and
3. Approve the Joint Use Lease Agreement between the City of Stanton and the Garden Grove Unified School District for the Norm Ross Sports Park Improvement Project; and
4. Authorize the City Manager to execute the Joint Use Lease Agreement and any related documents necessary for its implementation; and
5. Approve the conceptual site plan for the Project.
BACKGROUND:
The City of Stanton and Garden Grove Unified School District (GGUSD) have maintained a longstanding partnership to provide recreational opportunities for the community. Since 1983, the City and District have collaborated under a joint use agreement allowing the community to utilize a 4.3-acre portion of the Carver Early Childhood Education Center for recreational purposes. This partnership has been sustained through five amendments.
In March 2021, the City applied for grant funding from the California Department of Parks and Recreation under the Statewide Park Development and Community Revitalization Program (Proposition 68) to enhance recreational opportunities at the site.
In May 2022, the State Parks Department awarded the City $7,691,059 for the Norm Ross Sports Park Improvement Project (Project). The grant funding agreement requires that the City and District enter into a formal Joint Use Lease Agreement to govern the longterm operation and maintenance of the Project site. The proposed Joint Use Lease Agreement for the proposed Norm Ross Sports Park Improvement Project (Project) is attached hereto as Attachment B.
The proposed Project entails, among other things, the proposed development of a little league baseball field, lighting poles, two shaded bleachers, two shaded dug outs, a field storage structure, a U-12 soccer field, a multipurpose sports court, a playground, a courtyard amphitheater, shaded picnic areas, fitness equipment, a community garden, a storage building, a park building with restrooms, a new water basin, a new pedestrian bridge, a new perimeter wall on the east and southside of the Project site, new perimeter fencing on the west and northside of the Project site, a utility/emergency entrance, a utility access area, a small and large dog park, and the upgrading of an existing pedestrian bridge. A conceptual site plan for the proposed Project has been prepared, attached hereto as Attachment C.
An Initial Study/Mitigated Negative Declaration (IS/MND) (State Clearinghouse Number 2025050080) has been prepared for the Project pursuant to the California Environmental Quality Act (CEQA), and the IS/MND is attached hereto as Attachment D. The IS/MND analyzed the potential environmental impacts of the proposed Project, and it concludes 3 that the Project will not result in any significant and unavoidable impacts to the environment. The IS/MND further identifies mitigation measures to mitigate any potential impacts to a level of less than significant. These mitigation measures are set forth in both the IS/MND and in a Mitigation Monitoring and Reporting Program (MMRP) prepared for the Project, attached hereto as Attachment E.
ANALYSIS AND JUSTIFICATION:
The proposed Joint Use Lease Agreement establishes a 30-year initial term, with the possibility of two (2) five-year renewal terms, allowing for the continued joint operation of the Norm Ross Sports Park.
The Project will redevelop the 4.3-acre site into a modern community park. Upon completion, the City and District will jointly operate the facility in accordance with State Grant requirements, ensuring that the site remains a valuable community asset for years to come. The agreement allows the District to use the site without paying fees, and the City will not charge the District for joint use. Additionally, the entirety of the maintenance costs of the park will be the City's responsibility.
Approval of the Joint Use Lease Agreement will ensure the successful completion and operation of the Project, strengthening the City’s partnership with GGUSD and expanding recreational opportunities for residents. Staff recommends City Council approval and authorization for the City Manager to execute the agreement and related documents. Staff further recommends that the City Council adopt the MND and MMRP prepared for the Project under CEQA, as well as the conceptual site plan for the Project.
FISCAL IMPACT:
There is no immediate fiscal impact associated with executing the Joint Use Lease Agreement, approving the conceptual site plan for the Project, or adopting the MND and MMRP for the Project. The $7,691,059 in State Grant Funds will cover the majority of the cost of the Project and will be supplemented by $2 million from Park in Lieu Fees. Ongoing maintenance and operational costs will be borne by the City, with opportunities for cost recovery through programming and facility use fees to be identified after full design is complete.
ENVIRONMENTAL IMPACT:
An IS/MND has been prepared for the Project under CEQA, and the IS/MND concluded that the Project will not result in any significant and unavoidable impacts to the environment.
4 PUBLIC NOTIFICATION:
Public notification provided through the regular agenda process.
LEGAL REVIEW:
The City Attorney’s Office reviewed Attachment B as to form. The City Attorney has also reviewed Attachments C, D, and E.
STRATEGIC GOALS:
Goal 3. Provide quality infrastructure.
Goal 5. Maintain and promote a responsive, high-quality and transparent government.
Prepared by: Zenia Bobadilla, Community Services Director Reviewed by: Cesar Rangel P.E., Public Works Director/City Engineer Fiscal Impact Reviewed by: Michelle Bannigan, Finance Director Approved by:
ATTACHMENT:
A. Resolution No. 2025-28
B. Joint Use Lease Agreement for Norm Ross Sports Complex C. Conceptual Site Plan
D. Initial Study/Mitigated Negative Declaration
E. Mitigation Monitoring and Reporting Program
RESOLUTION NO. 2025-28
RESOLUTION NO. 2025-28
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF STANTON, CALIFORNIA, (1) ADOPTING A MITIGATED NEGATIVE DECLARATION AND A MITIGATION
MONITORING AND REPORTING PROGRAM FOR THE NORM ROSS SPORTS PARK
IMPROVEMENT PROJECT PURSUANT TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT; (2) APPROVING THE JOINT USE LEASE AGREEMENT BETWEEN
THE CITY OF STANTON AND THE GARDEN GROVE UNIFIED SCHOOL DISTRICT FOR THE NORM ROSS SPORTS PARK IMPROVEMENT PROJECT; AND
(3) APPROVING CONCEPTUAL SITE PLAN FOR THE NORM ROSS SPORTS PARK
IMPROVEMENT PROJECT
WHEREAS, since 1983, the City of Stanton (the “City”) and the Garden Grove Unified School District (“GGUSD”) have maintained a partnership to provide recreational opportunities for the community at the Norm Ross Sports Park located at 11111 Cedar Street in the rear of the Carver Early Education Center (APN 131-091-030) (the “Project site”); and
WHEREAS, in March 2021, the City applied for grant funding from the California Department of Parks and Recreation under the Statewide Park Development and Community Revitalization Program (Proposition 68) to enhance recreational opportunities at the Project site; and
WHEREAS, in May 2022, the State Parks Department awarded the City $7,691,059 for the Norm Ross Sports Park Improvement Project (“Project”), which would redevelop the Project site into a modern community park; the proposed Project entails, among other things, the proposed development of a little league baseball field, lighting poles, two shaded bleachers, two shaded dug outs, a field storage structure, a U-12 soccer field, a multipurpose sports court, a playground, a courtyard amphitheater, shaded picnic areas, fitness equipment, a community garden, a storage building, a park building with restrooms, a new water basin, a new pedestrian bridge, a new perimeter wall on the east and southside of the Project site, new perimeter fencing on the west and northside of the Project site, a utility/emergency entrance, a utility access area, a small and large dog park, and the upgrading of an existing pedestrian bridge; and WHEREAS, the aforementioned grant funding agreement requires that the City and GGUSD enter into a formal Joint Use Lease Agreement to govern the long-term operation and maintenance of the Project site; and
WHEREAS, the proposed Joint Use Lease Agreement establishes a 30-year initial term, with the possibility of two (2) five-year renewal terms, allowing for the continued joint operation of the Norm Ross Sports Park; under the agreement, upon completion of the proposed Project, the City and GGUSD will jointly operate the facility in accordance with State Grant requirements, ensuring that the site remains a valuable community asset for years to come; and
Attachment: A
Click here to return to the agenda.
RESOLUTION NO. 2025-28
WHEREAS, the City is the lead agency for the proposed Project under the California Environmental Quality Act (“CEQA”); and
WHEREAS, an Initial Study and Mitigated Negative Declaration (State Clearinghouse Number 2025050080) (“IS/MND”) has been prepared for the proposed Project consistent with the requirements of CEQA and the State CEQA Guidelines, and the IS/MND determined that the proposed Project will not result in any significant and unavoidable impacts to the environment; and
WHEREAS, the IS/MND was made available for public review from May 1, 2025 to June 2, 2025; and
WHEREAS, the City received one public comment on the IS/MND; the comment was from the California Department of Transportation (“Caltrans”), and the comment did not suggest that the proposed Project will have any significant impacts on the environment; and
WHEREAS, the IS/MND provides for mitigation measures to ensure that the proposed Project’s potential environmental impacts will be mitigated to a level of less than significant, and these mitigation measures are set forth in both the IS/MND and in a Mitigation Monitoring and Reporting Program (“MMRP”) that has been prepared for the proposed Project; and
WHEREAS, the City Council has reviewed and considered the IS/MND, MMRP, all public comments regarding the IS/MND and the proposed Project, and all other information contained in administrative record for the proposed Project; and WHEREAS, all other legal prerequisites to the adoption of this Resolution have occurred.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF STANTON, CALIFORNIA, HEREBY FINDS, DETERMINES, AND RESOLVES AS FOLLOWS:
SECTION 1: The City Council finds that the above recitations are true and correct and, accordingly, are incorporated as a material part of this Resolution.
SECTION 2: As the decision-making body for the proposed Project, the City Council has reviewed and considered the IS/MND, the MMRP, the comments received thereon, and the administrative record on file with the City. City Council finds that the IS/MND has been completed in compliance with CEQA and the State CEQA Guidelines, and that all environmental impacts of the proposed Project are either insignificant or can be mitigated to a less than significant level pursuant to the mitigation measures outlined in the IS/MND and the MMRP. The City Council further finds, on the basis of the whole record before it, that there is no substantial evidence in the record supporting a fair argument that the proposed Project may result in a significant effect on the environment. Comments received regarding the proposed Project have been considered and determined not to RESOLUTION NO. 2025-28
modify the conclusions of the IS/MND. The City Council finds that the IS/MND contains a complete, objective, and accurate reporting of the environmental impacts associated with the proposed Project, and that the IS/MND reflects the City’s independent judgment and analysis.
SECTION 3: The City Council hereby approves and adopts the IS/MND prepared for the Project.
SECTION 4: The City Council hereby approves and adopts the MMRP prepared for the Project.
SECTION 5: The City Council hereby approves the proposed Joint Use Lease Agreement between the City and GGUSD and authorizes the City Manager to execute the proposed Joint Use Lease Agreement and any related documents necessary for its implementation. In doing so, the City Council hereby approves the Project.
SECTION 6: The City Council hereby approves the conceptual site plan prepared for the proposed Project.
SECTION 7: The documents and materials that constitute the record of proceedings on which these findings are based are located at City Hall for the City of Stanton, located at 7800 Katella Avenue, Stanton, California. The Community and Economic Development Director is the custodian of these documents and the record of proceedings.
SECTION 8: Staff is directed to file a Notice of Determination with the County Clerk of the County of Orange and the State Clearinghouse within five (5) working days of approval of the Project.
SECTION 9: The City Clerk shall certify as to the adoption of this Resolution.
ADOPTED, SIGNED AND APPROVED this 24th day of June, 2025.
DAVID J. SHAWVER, MAYOR
APPROVED AS TO FORM:
HONGDAO NGUYEN, CITY ATTORNEY
RESOLUTION NO. 2025-28
ATTEST:
I, Patricia A. Vazquez, City Clerk of the City of Stanton, California DO HEREBY CERTIFY that the foregoing Resolution, being Resolution No. 2025-28 has been duly signed by the Mayor and attested by the City Clerk, all at a regular meeting of the Stanton City Council, held on June 24, 2025, and that the same was adopted, signed and approved by the following vote to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
PATRICIA A. VAZQUEZ, CITY CLERK
Joint Use Lease Agreement Page 1 of 26
Garden Grove Unified School District
City of Stanton
JOINT USE LEASE AGREEMENT
BY AND BETWEEN CITY OF STANTON
AND GARDEN GROVE UNIFIED SCHOOL DISTRICT
THIS JOINT USE LEASE AGREEMENT (“Agreement”) is made this 3rd day of March 2025 (“Effective Date”) by and between the GARDEN GROVE UNIFIED SCHOOL DISTRICT (“District”), a public school district duly organized and existing under the laws of the state of California, and the CITY OF STANTON (“City”), a municipal corporation duly organized and existing under the laws of the state of California. The District and the City are sometimes referred to collectively as the “Parties” and individually as a “Party.”
RECITALS
A. WHEREAS, the District is committed to family-school-community partnerships, whereby District schools and other community organizations engage with students, families, and the local community in meaningful ways.
B. WHEREAS, California Education Code (“Education Code”) sections 10900 et seq. (“Community Recreation Act”), authorize the District and the City to “organize, promote, and conduct programs [for] community recreation. . . .” and to cooperate in providing community recreation programs and facilities that will contribute to general recreational and educational objectives for children and adults of the state.
C. WHEREAS, under Education Code section 10905, two or more public authorities may cooperate with each other to carry out the purposes set forth in Education Code section 10900 et seq., “and to that end may enter into agreements with each other and may do any and all things necessary and convenient to aid and cooperate in carrying out the purposes.” D. WHEREAS, the District and the City are authorized to operate and maintain recreation facilities including, but not limited to, play fields, parks, performing arts centers, hardscapes, and, by virtue of that authority, do operate and maintain such recreation facilities.
E. WHEREAS, pursuant to Education Code section 17527(a), the District Board of Education (“Board”) is further authorized to “enter into agreements to make vacant classrooms or other space in operating school buildings available for rent or lease to other school districts, educational agencies, except private educational institutions which maintain kindergarten or grades 1 to 12, inclusive, governmental units, nonprofit organizations, community agencies, professional agencies, commercial and noncommercial firms, corporations, partnerships, businesses, and individuals, including during normal school hours if the school is in session.”
F. WHEREAS, pursuant to Education Code section 17527(a), the District Board is further authorized to “enter into agreements to make vacant classrooms or other space in operating school buildings available for rent or lease to other school districts, educational agencies, except private educational institutions which maintain kindergarten or grades 1 to 12, inclusive, governmental units, nonprofit organizations, community agencies, professional agencies, commercial and noncommercial firms, corporations, partnerships, businesses, and individuals, including during normal school hours if the school is in session”.
G. WHEREAS, the District owns improved real property located at 11150 Santa Rosalia Street in the City of Stanton, County of Orange, State of California, and operates Carver Early Childhood Education Center (“School Site”), further identified in EXHIBIT A, attached hereto and incorporated herein by this reference.
H. WHEREAS, on or about July 12, 1983, the Parties executed an agreement (“1983 Agreement”) that permitted the City to develop—and thereafter jointly utilize—a 4.3-acre portion of the School Site (“Shared Use Area”) for community recreation purposes.
Attachment: B
Click here to return to the agenda.
Joint Use Lease Agreement Page 2 of 26
Garden Grove Unified School District
City of Stanton
I. WHEREAS, the 1983 Agreement allowed the City to utilize the Shared Use Area for 10 years. Beginning in 1993, the Parties amended the 1983 Agreement every five years (each an “Amendment”). Each Amendment authorized the City to use the Shared Use Area for an additional five years. The most recent Amendment occurred on May 15, 2018, and enabled the City to use the Shared Use Area until its expiration on June 30, 2023.1 J. WHEREAS, on March 12, 2021, the City applied (“Application”) for grant funding from the California Department of Parks and Recreation (“State Parks Department”) to finance a project on the School Site known as the “Norm Ross Sports Complex Improvement Project” (“Project”). The State Parks Department approved the Application and awarded the City $7,691,059.00 to fund the Project (“Grant Funds”).
K. WHEREAS, on or about May 19, 2022, the City and State Parks Department entered into that certain “Grant Contract,” which governs the use of the Grant Funds for the Project. True and correct copies of the Application and Grant Contract (collectively the “Grant Materials”) are attached hereto as EXHIBIT B and incorporated herein by reference.
L. WHEREAS, the Project will redevelop approximately 4.3 acres of the School Site into a new community park, which the Parties anticipate will be named the “Norm Ross Sports Park” (“Joint Use Area”).
M. WHEREAS, in accordance with State requirements, the Parties will jointly utilize the Joint Use Area upon completion of the Project.
N. WHEREAS, under Education Code section 17534(b), the District may execute agreements with public agencies for a lease term greater than five years when “capital outlay improvements are made on school property for park and recreation purposes.”
O. WHEREAS, pursuant to Education Code section 17529, the District has determined, by approving this Agreement, that allowing the City to complete the Project and to then jointly use the School Site will not (1) interfere with any educational programs or activities of any school or class conducted on the School Site, (2) unduly disrupt the residents in the surrounding neighborhood, or (3) jeopardize the safety of any children at the School Site.
P. WHEREAS, the Parties now wish to enter into this Agreement to memorialize each Party’s rights and obligations with respect to the Project as well as the terms and conditions governing their joint use of Norm Ross Sports Park (i.e., the Joint Use Area) upon the Project’s completion.
NOW THEREFORE, in consideration of the mutual covenants and conditions contained in this Agreement, the Parties agree as follows:
AGREEMENT
1. RECITALS. The recitals above are true and correct and are hereby incorporated by this reference to the same extent as though fully set forth herein.
2. AGREEMENT TO COOPERATE. The Parties hereby agree to cooperate in coordinating their rights and duties conducted under this Agreement. Each Party agrees to promptly respond to concerns relating to use of the Joint Use Area expressed by the other Party or neighbors of the Joint Use Area. 1 The first Amendment is dated July 12, 1993; the second Amendment is dated June 30, 1998; the third Amendment is dated June 30, 2003, the fourth Amendment is dated June 30, 2008, and the fifth Amendment is dated May 15, 2018.
Joint Use Lease Agreement Page 3 of 26
Garden Grove Unified School District
City of Stanton
3. TERM.
3.1. Initial Term. This Agreement shall commence on the Effective Date, following District Board of Education (“Board”) approval, and shall be for 30 years from the Effective Date (“Initial Term”), unless sooner terminated under any provision hereof. Any extension of the Initial Term shall be subject to the Board making subsequent findings required under Education Code section 17527.
3.2. Renewal Terms. At the conclusion of the Initial Term, the Parties may renew this Agreement for two (2) additional five-year terms by mutual, fully executed written amendment hereto (“Renewal Term”). The Initial Term and any Renewal Terms shall be collectively referred to herein as the “Term.”
3.3. Extension of Terms. To renew the Term, the City must submit a written request (“Renewal Request”) to the District at least six months prior to the expiration of the preceding Term. The decision to approve or reject the City’s Renewal Request shall be at the sole discretion of the Board pursuant to the requirements of Education Code section 17527 et seq.
4. PRIOR AGREEMENTS. Upon the Effective Date set forth above, this Agreement shall replace and supersede the 1983 Agreement, all Amendments thereto, and any other agreements governing the District and City’s joint use of the School Site.
5. NO CONVEYANCES.
5.1. Title to the School Site and Joint Use Area. Nothing in this Agreement shall in any way alter the District’s fee title ownership interest in the School Site or Joint Use Area. Nothing herein shall be construed as creating an easement, or any other interest in land except a defined term leasehold.
5.2. City Administration and Ownership of Grant Funds. The City shall be the administrator of the Grant Funds. With respect to District, nothing herein shall be deemed to convey ownership of, or any rights to administer or receive a disbursement of, the Grant Funds. Given the foregoing, District shall not invoice or otherwise request a disbursement of Grant Funds from the City.
6. JOINT USE AREA. Subject to the terms of this Agreement, the District consents to the City effectuating the Project on the Joint Use Area portion of the School Site, which is more fully depicted and described in EXHIBIT C, attached hereto and incorporated herein by reference. The District further agrees that the Project will result in the City causing the Joint Use Area to be redeveloped in a substantially similar manner to the improvements depicted and described in EXHIBIT D, attached hereto and incorporated herein by reference (“Improvements”).
7. TERMINATION.
7.1. Termination for Cause. Consistent with the Grant Materials, either Party may terminate this Agreement for cause (“Cause”) where all of the following are satisfied:
7.1.1. The non-terminating Party has materially breached the terms or conditions set forth in this Agreement.
7.1.2. The non-breaching Party notifies the breaching Party of the violation in writing at least 60 days prior to the effective date of the termination.
Joint Use Lease Agreement Page 4 of 26
Garden Grove Unified School District
City of Stanton
7.1.3. The breaching Party fails to cure such violation within 60 calendar days after receipt of such written notice, or within a period that the Parties agree to in writing.
7.2. Obligations Upon Termination or Expiration.
7.2.1. If this Agreement is terminated for Cause, the breaching Party shall defend, indemnify, and hold harmless the non-breaching Party in connection with any consequences arising from the early termination, including, but not limited to, any action by the State of California to recoup the Grant Funds.
7.2.2. Consistent with the Grant Materials, if this Agreement is terminated before the Project is complete, the Parties acknowledge and agree that City shall return any unspent Grant Funds to the State of California.
8. ACCESS, MAINTENANCE, AND UTILITIES.
8.1. Access & Maintenance. The City shall maintain the Joint Use Area in a safe and attractive manner including, without limitation, any lighting equipment, fixtures, utilities, and the Improvements contemplated by EXHIBIT D. The City shall have an unrestricted right of entry to the Joint Use Area outside of School Hours (defined below) to perform its obligations under this Section 8. The City and the District shall come to an agreement regarding when the City (and its agents, consultants, contractors, directors, and employees) will access the Joint Use Area to perform its obligations under this Section 8 during School Hours.
8.2. District Requested Maintenance & Repairs. If the District determines that any maintenance or repairs to the Joint Use Area are needed, the District will submit a written request to the City regarding such maintenance and/or repairs. Thereafter, the Parties will meet and confer to address the District’s request.
8.3. Locks and Keying. In the event that the City intends to replace the locks and/or rekey the Joint Use Area, the City shall first coordinate with the District so that the District may approve and authorize the lock style and key code authorizations.
8.4. Utilities. The City shall install, at its sole expense, all water, sewer, electricity, gas, and other utilities in the Joint Use Area. All costs for such utilities shall be paid by the City and determined by separate meters serving the Joint Use Area.
8.5. No City Usage Fee. Except as otherwise provided herein, District will not charge, levy, or impose any fee upon the City in connection with the City’s use of the Joint Use Area.
9. USE OF JOINT USE AREA.
9.1. City and Community Use.
9.1.1. Subject to the provisions of this Agreement, and any additional rules and regulations adopted by the City and District, the Joint Use Area shall be open and available for use by the general public.
9.1.2. The City and City-Sponsored Organizations (defined below) shall use the Joint Use Area for recreational purposes. Agents, consultants, contractors, directors, employees, invitees, licensees, members, officers, representatives, and volunteers of City shall be subject to the terms and conditions of use set forth in this Agreement, Board Policies and Administrative Regulations for Community Relations sections 3000 et seq., and the Civic Center Act, Education Code section 38130 et seq.
Joint Use Lease Agreement Page 5 of 26
Garden Grove Unified School District
City of Stanton
9.1.2.1. The term “City-Sponsored Organization(s)" refers to any group, entity, or organization that operates under the auspices of the City, receives financial or administrative support from the City, or is officially recognized by the City as an affiliated partner in the planning, organization, or execution of events, programs, or activities.
9.1.3. The City shall cooperate in good faith with District to ensure that the public’s use of the Joint Use Area does not interfere with District’s use of the non-Joint Use Area portions of the School Site.
9.2. District Use. District students, employees, invitees, licensees, contractors, and volunteers shall have non-exclusive access to the Joint Use Area for District activities between the hours of 7:00 A.M. until to 4:00 P.M., Monday through Friday, while school is in session, excepting District sanctioned school holidays (e.g. Spring Break, Thanksgiving Break, etc.) (“School Hours”).
9.3. Exclusive Use Events. Each Party shall have the right to schedule events that will temporarily result in exclusive use of portions of the Joint Use Area and render said portions of the Joint Use Area unavailable for use by the other Party (“Exclusive Use Event”). The Party desiring to schedule an Exclusive Use Event shall provide at least 30 calendar days advance written notice to the other Party. Thereafter, the Parties will meet and confer in good faith to accommodate the proposed Exclusive Use Event.
9.4. Fees; Civic Center Act.
9.4.1. The City and District agree to keep the Joint Use Area open and available for use by the general public, subject this Agreement and to rules and regulations adopted by the City and District.
9.4.2. The District shall not be subject to any City-adopted Joint Use Area use fees. All District scheduling, use, fee collection, and other activities shall comply with this Agreement and the Civic Center Act, Education Code section 38130, et seq.
9.4.3. The City shall not be subject to any District-adopted Joint Use Area fees. The City may adopt fees in connection with the use of the Joint Use Area by members of the public as authorized under state law.
9.5. Personnel and Equipment. Each Party shall be solely responsible for the administration and operation of its activities within the Joint Use Area.
9.5.1. The Parties, at their sole cost and expense, shall provide necessary personnel, equipment, or other property to perform their obligations herein.
9.5.2. The City shall furnish its own equipment or other property needed to conduct the Project at its sole expense. The District shall not provide any special equipment or property.
9.5.3. All personnel hired by a Party shall be employees or independent contractors of that Party and shall not be construed as employees or independent contractors of the other Party for any purpose whatsoever.
9.5.4. Each Party shall be responsible for:
9.5.4.1. Verifying the qualifications, credentials, certificates, and licenses of its staff, employees, agents, consultants, and/or sub-consultants/contractors who may provide services, or otherwise using on the Party’s behalf, within the Joint Use Area; and
Joint Use Lease Agreement Page 6 of 26
Garden Grove Unified School District
City of Stanton
9.5.4.2. Ensuring compliance with all applicable fingerprinting and background check requirements as set forth in section 39 of this Agreement and EXHIBIT F, attached hereto and incorporated herein.
10. COMPLIANCE WITH APPLICABLE LAW. The City and District shall comply with all applicable federal, state, and local laws, regulations, and policies governing their rights, responsibilities, and activities pursuant to this Agreement.
11. CONDITION OF PREMISES.
11.1. “AS-IS” Condition. The Premises are offered to the City for use on an "AS IS" basis. The District shall not be required to make or construct any alterations including structural changes, additions, or improvements to the Joint Use Area. By execution of this Agreement, the City hereby accepts the Joint Use Area in “AS IS” condition. It is the City’s responsibility to make such improvements as it deems necessary to make the Joint Use Area suitable for City’s intended use.
11.2. Representations and Warranties. The City acknowledges that the District has not made any representations or warranties as to the suitability of the Joint Use Area for the City’s intended use. Any agreements, warranties, or representations not expressly contained in this Agreement shall in no way bind the Parties. The Parties expressly waive all claims for damages by reason of any statement, representation, warranty, promise, or agreement, if any, not contained in this Agreement.
11.3. Unsafe Conditions. Neither Party shall cause or permit any Dangerous Condition (defined below) or Hazardous Materials (defined below) to exist in the Joint Use Area. Each Party shall promptly provide notice to the other Party if it becomes aware of any Dangerous Condition or Hazardous Materials in the Joint Use Area. Such notice shall be provided in accordance with the procedures set forth in Section 12 (Accident/Incident Reporting) herein.
11.3.1. Dangerous Condition. “Dangerous Condition”, as defined in Government Code Section 830(a), “means a condition of property that creates a substantial (as distinguished from a minor, trivial or insignificant) risk of injury when such property or adjacent property is used with due care in a manner in which it is reasonably foreseeable that it will be used.”
11.3.2. Hazardous Materials. The term "Hazardous Materials" means any hazardous or toxic substance, material, or waste which is, or becomes, regulated by any local governmental authority, the State of California, or the United States Government.
12. ACCIDENT/INCIDENT REPORTING. Each Party shall submit a written report to the other Party as soon as practicable after it receives information or notice of any injuries, property damage, claims, arrests, or criminal charges associated with the reporting Party’s use of the Joint Use Area. The foregoing shall include, but is not limited to, incidents or accidents associated with a Party’s employees or contractors working in the Joint Use Area. Submission of written reports shall be made pursuant to Section 21 (Notice). “In addition to submitting a written report, the reporting Party shall also verbally notify the other Party in accordance with the following:
12.1. District Contacts. Between the hours of 7:00 A.M. and 4:00 P.M., Monday through Friday, verbal notification shall be provided to the District’s Business Office at (714) 663-6000; at all other times, verbal notification shall be provided to the District’s non-business hours contact, which has been provided to the City outside of this Agreement.
12.2. City Contacts. Between the hours of 7:00 A.M. and 6:00 P.M., Monday through Thursday, verbal notification shall be provided to the Community Services Director at (714) 890-4270; at all other times, verbal notification shall be provided to the City’s non-business hours contact, which has been provided to the District outside of this Agreement.
Joint Use Lease Agreement Page 7 of 26
Garden Grove Unified School District
City of Stanton
13. IMPROVEMENTS.
13.1. Applicability. The following shall govern the City’s construction, renovation, modification, major repair, or demolition to, on, or within the Joint Use Area including, but not limited to, the Project and the Improvements (collectively the “Work”).
13.2. Construction, Renovation, Repair, or Demolition. The City shall not initiate any Work without first obtaining all of the following: (i) prior written consent from District (which will not be unreasonably withheld or delayed); (ii) the District’s prior written approval of the final plans, specifications, and schedule for completion thereof; and (iii) any other approvals required by law, including, but not limited to, the Division of the State Architect (“DSA”) and any other governmental authority having jurisdiction over the Work. In complying with the foregoing, City will: (a) provide District with copies of any applicable approvals from DSA and any other governmental authorities within 10 days after the City’ receipt thereof; and (b) be responsible for paying all costs associated with obtaining approvals from the DSA and any other governmental authority having jurisdiction over the Work.
13.3. Phases. The Parties recognize that approvals may be completed in phases, such that the City may initially request conceptual approval and, if approved by District, the City will then proceed to draft the plans and specifications.
The District will respond to the City with its approval or disapproval of plans and drawings within 15 days after District acknowledges receipt of a written request with architectural plans and drawings from City. The District’s approval shall not be unreasonably withheld or delayed.
13.4. Method of Performance. The City shall cause all Work to be diligently pursued to completion in accordance with the schedule for completion reasonably approved by District, subject to unavoidable delays caused by weather, pandemics, supply shortages, strikes, or acts of God. All Work shall be: (i) performed in a sound and workmanlike manner; (ii) in compliance with all applicable laws and building codes; and (iii) in conformance with the plans and specifications approved by District and DSA, if applicable, or any modifications thereto which have been approved in writing by District.
13.5. DSA-Inspections. If any Work requires the use of DSA-approved inspector services, the City shall pay DSA directly for such services.
13.6. District Right to Inspect. The District and/or District's agents shall have a continuing right at all times to enter and inspect the Joint Use Area, provided that inspections do not unreasonably interfere with the Work. The City shall require its contractors to reasonably cooperate with District and its agent during such inspections.
13.7. Delivery of As-Built Plans. Within 90 days after completion of the Improvements, the City shall deliver to the District as-built plans. If requested by the District, the City will provide the District with two full and complete sets of such as-built plans.
13.8. DSA Certifications. Upon completion of the Improvements requiring DSA approval, City shall ensure diligent and timely certification by DSA and deliver such certifications not later than nine months after completion of the Improvements.
13.9. Ownership of Improvements; Expiration or Termination of Agreement.
13.9.1. City Ownership. All Improvements constructed by the City shall be the City’s property.
Joint Use Lease Agreement Page 8 of 26
Garden Grove Unified School District
City of Stanton
13.9.2. Expiration of Termination. Except as otherwise agreed to by the Parties in writing, within 180 days of this Agreement’s expiration or termination, the City shall remove any Improvements from the Joint Use Area that:
(i) the City wishes to retain, at its sole and absolute discretion; and (ii) the District requests in writing be removed. Any such removal shall be at the City’s sole expense. Ownership of any Improvements that are not removed by the City in accordance with this Section 13.9 shall vest with the District.
13.9.3. Restoration. If any portion of the Improvements are removed from the Joint Use Area, the City shall restore the applicable portion thereof to its original condition. Any such restoration shall be at the City’s sole expense and be completed within 90 days after the Improvements are removed, or within a period of time agreed to by the Parties in writing.
14. CONFLICTS WITH GRANT MATERIALS OR STATE REQUIREMENTS. If this Agreement conflicts with any part of the Grant Materials or any Project-related requirement imposed by the State of California (including, but not limited to, State Parks), the relevant Grant Materials or State requirement shall control.
15. TAXES, ASSESSMENTS AND FEES. The City shall pay all taxes, assessments, and other governmental fees which may be levied or assessed upon the Joint Use Area which are attributable to the Improvements or use of the Joint Use Area by or through the City pursuant to this Agreement. The City shall pay the amounts when due and prior to any delinquency and shall deliver to District evidence of payment satisfactory to District within 30 days after a request by District for evidence of payment. The provisions of this section shall survive the expiration or termination of this Agreement.
16. JOINT USE AREA RULES & REGULATIONS.
16.1. City Park and Playground Rules and Regulations. Use of the Joint Use Area shall be governed in part by the City rules and regulations set forth in Chapter 14.04 (Park and Playground Use) of the Stanton Municipal Code (“Municipal Code”), attached hereto as EXHIBIT E and incorporated herein by reference.
16.1.1. If Chapter 14.04 is amended after the Effective Date, then the amended Chapter 14.04 shall be incorporated herein by reference and govern the Joint Use Area.
16.1.2. The City shall be solely responsible for enforcing the Municipal Code within the Joint Use Area. The District shall bear no responsibility for Municipal Code enforcement.
16.2. District Facility Use Policies Rules and Regulations. Use of the Joint Use Area shall also be governed by the District’s then-existing Board Policies, Administrative Regulations, and Facility Use Rules (“District Use Rules”), which include prohibitions on the possession, use, sale, or consumption of tobacco, cannabis, and any other controlled substances, as well as the serving and sale of alcoholic beverages and the conducting of games of chance. Current District Use Rules refers to Administrative Regulations 3134, as revised as of September 20, 2022, and 3135.3, as revised as of August 23, 2016, each which can be found here: https://policy.ggusd.us/31353 and https://policy.ggusd.us/3134.
16.2.1. If the District Use Rules are amended after the Effective Date, then the amended District Use Rules shall be incorporated herein by reference and govern the Joint Use Area.
16.2.2. The District shall have primary responsibility for enforcing its District Use Rules within the Joint Use Area. The City shall make reasonable, good-faith efforts to enforce these District Use Rules when using the Joint Use Area, as well as during use by City-Sponsored Organizations. This includes taking appropriate action to exclude any persons or entities known to have violated the District Use Rules.
Joint Use Lease Agreement Page 9 of 26
Garden Grove Unified School District
City of Stanton
16.2.3. To support the City's enforcement efforts, District shall promptly notify City of any persons or entities known to have violated District Use Rules. Upon receiving such notice, City shall take necessary steps to enforce the exclusion of these individuals or entities during any City or City-Sponsored Organization activities within the Joint Use Area.
16.3. General Enforcement Responsibilities. The District shall be solely responsible for enforcing its Use Rules in the Joint Use Area during the District’s Exclusive Use and School Hours. The City shall be solely responsible for enforcing Stanton Municipal Code Chapter 14.04 and the District Use Rules during all other times
17. ENTITLEMENTS. The City shall be solely obligated and responsible for obtaining any entitlements including, but not limited to permits, or any other jurisdictional agency for the use of the Joint Use Area. The District makes no representation or warranty regarding the use of the Joint Use Area.
18. LIENS. The City shall endeavor to ensure that no lien of mechanics or materialmen or others is placed against the Joint Use Area or the School Site with respect to work or services claimed to have been performed or materials claimed to have been furnished to City. If such a lien occurs, City covenants and agrees to cause any lien or notice of lien to be released and removed of record. Notwithstanding anything to the contrary set forth in this Agreement, in the event that such lien is not released and removed within 90 days of the date notice of such lien is delivered by District to City, District, at its sole option, may immediately take all action necessary to release and remove such lien, without any duty to investigate the validity thereof, and all sums, costs, and expenses, including reasonable attorneys’ fees and costs, incurred by District in connection with such lien shall be deemed immediately due and payable to District by City.
19. INDEMNIFICATION.
19.1. Willful Misconduct. For purposes of this Section 19, “Willful Misconduct” means an intentional action so unreasonable or dangerous that the individual performing the action knows or should know it is highly probable to result in harm.
19.2. Survival. The provisions of this Indemnification section shall survive the termination or expiration of the Agreement.
19.3. City Indemnification. To the fullest extent permitted by California law, the City shall defend, indemnify, and hold harmless the District and its Board members, agents, attorneys, consultants, contractors, employees, invitees, licensees, members, officers, representatives, trustees, and volunteers (“Indemnified District Parties”) from any and all losses, liabilities, challenges, claims, suits, and actions of any and every kind, nature, and description, including, but not limited to, attorneys’ fees and costs, directly or indirectly arising out of, on account of, connected with, or resulting from: (1) the City’s performance of, or lack of performance of, any of its obligations under this Agreement; and (2) the sole negligence, recklessness or willful misconduct of the City or its Councilmembers, agents, attorneys, consultants, contractors, employees, invitees, licensees, members, officers, representatives, trustees, and volunteers in the entitlement, operation, condition, use, or occupancy of the Joint Use Area, and all improvements thereon. The City’s obligations under this Section shall exist regardless of the Indemnified District Parties’ negligence., except, to the extent of the sole negligence or partial negligence or willful misconduct of Indemnified District Parties, in which case City’s indemnification obligation shall be reduced in proportion to the Indemnified District Parties’ established share of liability for its sole or partial negligence or willful misconduct, if any.
19.4. District Indemnification: To the fullest extent permitted by California law, the District shall defend, indemnify, and hold harmless City and its Councilmembers, agents, attorneys, consultants, contractors, employees, invitees, licensees, members, officers, representatives, trustees, and volunteers (“Indemnified City Parties”) from any and all losses, liabilities, challenges, claims, suits, and actions of any and every kind, nature, and description, including, but not limited to, attorneys’ fees and costs, directly or indirectly arising out of, on account of, connected with, or resulting from: (1) the District’s performance of, or lack of performance of, any of its obligations under this Agreement; and (2) the sole negligence, recklessness or willful misconduct of the District or its Board members, agents, attorneys, consultants, contractors, employees, invitees, Joint Use Lease Agreement Page 10 of 26
Garden Grove Unified School District
City of Stanton
licensees, members, officers, representatives, trustees, and volunteers in the entitlement, operation, condition, use, or occupancy of the Joint Use Area, and all improvements thereon. The District’s obligations under this Section shall exist regardless of the Indemnified City Parties’ negligence, except, to the extent of the sole negligence or partial negligence or willful misconduct of Indemnified City Parties, in which case District’s indemnification obligation shall be reduced in proportion to the Indemnified City Parties’ established share of liability for its sole or partial negligence or willful misconduct, if any.
20. INSURANCE.
20.1. City Insurance. The City shall, at the City’s expense, obtain and keep in force during the term of this Agreement a policy of general liability insurance, which includes auto liability insuring District and City against claims and liabilities arising out of the operation, condition, use, or occupancy of the Joint Use Area and all areas appurtenant thereto, including parking areas. The City’s auto liability shall insure all vehicle(s), whether hired, owned, or non-owned. City’s general insurance shall be at least as broad as the Insurance Service Office (ISO) CG 00-01 form and in an amount of not less than One Million dollars ($1,000,000) for bodily injury or death and property damage as a result of any one occurrence and a Two Million dollar ($2,000,000) general aggregate policy limit.
20.2. Sexual Misconduct Insurance. Beginning on the Effective Date of this Agreement, and continuously until the Parties mutually agree that the Work addressed herein has been completed on the Joint Use Area, the City shall, at the City’s expense, obtain and keep in force a policy for sexual abuse and molestation which covers bodily injury, emotional distress or mental anguish related to any claim, cause of action or liability associated with child molestation or sexual abuse, insuring the District and the City against claims and liabilities arising out of the City’s operation, condition, use, or occupancy of the Joint Use Area and all areas appurtenant thereto, including parking areas. The City’s sexual abuse and molestation policy coverage shall be in an amount of not less than Three Million dollars ($3,000,000) per wrongful act and Six Million dollars ($6,000,000) aggregate. This coverage may be provided as an endorsement to the general liability insurance or under a separate policy and must be written on an “occurrence” and not on a claim made or claims made and reported basis. Coverage must not be subject to any exclusion, restriction, or sub-limit. The District, its Board members, employees, agents, and volunteers must be named as additional insureds with respect to sexual abuse and molestation claims. The coverage must contain a severability of interests/cross liability clause or language stating that the City’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
20.2.1. City Self-Insurance Program. The District acknowledges that the City maintains a program of self-insurance that satisfies the insurance requirements herein and is not required to obtain additional policies, with the exception of a policy for sexual abuse and molestation, so long as its self-insurance program remains in place.
20.3. District Insurance. The District shall, at the District’s expense, obtain and keep in force during the term of this Agreement a policy of general liability insurance, which includes auto liability insuring District against claims and liabilities arising out of the operation, condition, use, or occupancy of the Joint Use Area and all areas appurtenant thereto, including parking areas. District’s auto liability shall insure all vehicle(s), whether hired, owned, or non-owned. The District’s general insurance shall be at least as broad as the Insurance Service Office (ISO) CG 00-01 form and in an amount of not less than One Million dollars ($1,000,000) for bodily injury or death and property damage as a result of any one occurrence and a Two Million dollar ($2,000,000) general aggregate policy limit.
20.4. Indemnification. The City shall indemnify, defend (by counsel reasonably approved in writing by the District), protect, release, save, and hold the District harmless from and against all claims arising from any breach of the City’s covenants under this section. The District shall indemnify, defend (by counsel reasonably approved in writing by the City), protect, release, save, and hold the City harmless from and against all claims arising from any breach of the District’s covenants under this section.
Joint Use Lease Agreement Page 11 of 26
Garden Grove Unified School District
City of Stanton
20.4.1. Survival. The provisions of this Indemnification section 20 shall survive the termination or expiration of the Agreement.
21. NOTICE. Any notice required or intended to be sent or delivered to a Party, shall be in writing and delivered:
(a) in-person; (b) by certified mail, postage prepaid, return receipt requested; or (c) by commercial overnight courier that guarantees next day delivery and provides a receipt. Notice shall be delivered to the Parties at the following addresses:
DISTRICT:
Garden Grove Unified School District
11700 Knott Avenue, Building C
Garden Grove, CA 92841
Attn: Kevin Heerschap, Director of Facilities
E-mail: [email protected]
Telephone: (714) 663-6442
COPY TO:
Orbach Huff & Henderson LLP
1901 Avenue of the Stars, Suite 575
Los Angeles, CA 90067
Attn: Sarine A. Abrahamian, Esq.
E-mail: [email protected]
Telephone: (310) 788-9200
CITY:
City of Stanton
7800 Katella Avenue
Stanton, CA 90680
Attn: Hannah Shin-Heydorn, City Manager
E-mail: [email protected]
Telephone: (714) 379-9222
COPY TO:
City of Stanton
18101 Von Karman Ave., Suite 1000
Irvine, CA 92612
Attn: HongDao Nguyen, City Attorney
E-mail: [email protected]
Telephone: (949) 263-2614
Any notice personally given shall be effective upon receipt. Notice sent by overnight delivery service shall be effective the business day next following delivery thereof to the overnight delivery service. Notice sent by USPS shall be effective within three business days following delivery thereof to USPS. Courtesy copies of notices, certificates, and other communications shall also be provided by electronic mail to the e-mail addresses identified above, provided that failure to receive a courtesy copy under this paragraph is not a defect in notice.
22. ASSIGNMENT. Neither Party shall assign its rights, duties, or privileges under this Agreement nor shall either Party attempt to confer any of its rights, duties, or privileges under this Agreement on any third Party, without the written consent of the other Party.
23. NON-DISCRIMINATION. All goods and services provided by City and District under this Agreement shall be available to all qualified persons regardless of age, sex, race, religion, color, national origin, or ethnic background, or disability, and that none shall be used in whole or in part, for religious worship or instruction.
24. WAIVER. The waiver by either Party of any breach of any term, covenant, or condition herein contained shall not be deemed to be a waiver of such term, covenant, condition, or any subsequent breach of the same or any other term, covenant, or condition herein contained.
25. SURRENDER OF THE JOINT USE AREA. Upon the expiration or termination of this Agreement, the City shall surrender the Joint Use Area to the District. Any removal of the Improvements or restoration of the Joint Use Area shall be in accordance with Section 13.9 above.
Joint Use Lease Agreement Page 12 of 26
Garden Grove Unified School District
City of Stanton
26. ENTIRE AGREEMENT. This Agreement constitutes the entire understanding between the Parties and no addition to, or modification of, any term or provision of this Agreement shall be effective until set forth in writing signed by the Parties.
27. NO THIRD-PARTY BENEFICIARIES. Unless otherwise expressly provided, this Agreement shall not create any third-party beneficiary rights for any person or entity.
28. CAPTIONS. The captions contained in this Agreement are for convenience only and shall not in any way affect the meaning or interpretation hereof nor serve as evidence of the interpretation hereof, or of the intentions of the Parties.
29. SEVERABILITY. Should any provision of this Agreement be determined to be invalid, illegal, or unenforceable in any respect, such provision shall be severed, and the remaining provisions shall continue as valid, legal, and enforceable, unless such enforcement would be unreasonable or inequitable under all the circumstances or would frustrate the purposes of this Agreement.
30. CALIFORNIA LAW. This Agreement shall be governed by, and the rights, duties and obligations of the Parties shall be determined and enforced in accordance with, the laws of the State of California. All actions or proceedings brought to enforce the terms and conditions of this Agreement shall be maintained in the County of Orange, California.
31. DISPUTE RESOLUTION. If a dispute arises that is related, in any way, to this Agreement, the District’s Superintendent and the City Manager shall first attempt to resolve the dispute. In the event the Superintendent and City Manager are unable to resolve the dispute, the Parties agree to submit the dispute to mediation prior to initiating legal action.
32. AMENDMENT AND MODIFICATION. This Agreement and all Exhibits attached hereto may be amended or modified in writing, signed by the Parties. No amendments, changes, or modifications to the Agreement or Exhibits shall be valid or binding until approved by the City Council and the District Board.
33. COUNTERPARTS. This Agreement and all amendments and supplements to it may be executed in counterparts, and all counterparts together shall be construed as one document.
34. NO PRESUMPTION REGARDING DRAFTEE. The Parties acknowledge and agree that the terms and provisions of this Agreement have been negotiated and discussed between the Parties and their attorneys, and this Agreement reflects their mutual agreement regarding the same. Because of the nature of such negotiations and discussions, it would be inappropriate to deem any Party to be the drafter of this Agreement, and therefore no presumption for or against validity or as to any interpretation hereof based upon the identity of the drafter shall be applicable in interpreting or enforcing this Agreement.
35. ELECTRONIC SIGNATURES. Electronic copies of signatures (such as .pdf or .tiff files or telecopies) may be used in place of original signatures on this Agreement. The Parties intend to be bound by the signatures on the electronic document, are aware that the other Party will rely on the electronically copied signatures, and hereby waive any defenses to the enforcement of the terms of this Agreement based on the form of signature.
36. GOVERNING BODY APPROVAL. This Agreement and all exhibits attached hereto, as well as any subsequent amendments and modifications, shall not be valid or binding until approved by the District Board and City Council.
37. INDEPENDENT CONTRACTOR STATUS. This Agreement is by and between independent entities and is not intended to and shall not be construed to create the relationship of agent, servant, employee, partnership, joint venture, or association.
Joint Use Lease Agreement Page 13 of 26
Garden Grove Unified School District
City of Stanton
38. ATTORNEYS’ FEES. In the event either Party initiates legal action to enforce its rights under this Agreement, in whatever forum, public or private, each Party shall be solely responsible for its costs and attorneys’ fees. No court shall have authority or jurisdiction to rule or order contrary to this section.
39. FINGERPRINTING AND CRIMINAL BACKGROUND VERIFICATION.
39.1. The City shall ensure strict compliance with all applicable fingerprinting and criminal background investigation requirements set forth in California Education Code section 45125.1, which may be met under the fingerprinting provisions of Title 22 of the California Code of Regulations and applicable provisions of the California Health and Safety Code relevant to community care facility licensing. (Health & Safety Code, § 1500 et seq.) and any other relevant federal, state, or local laws, regulations, and orders related to working with minors. This requirement applies to all City employees, contractors, subcontractors, agents, volunteers, or any other individuals (collectively, "Personnel") engaged by the City who may interact with District pupils during activities at the Joint Use Area, pursuant to Education Code section 45125.1(c). (Educ. Code, §§ 45125.1(a)&(c).)
39.2. Before any City Personnel begin work or participate in activities at the Joint Use Area that may interact with District pupils within the purview of California Education Code section 45125.1, the City shall complete and submit EXHIBIT F to the District to verify compliance with the fingerprinting and criminal background investigation requirements. The City shall also maintain a comprehensive list of all City Personnel who have received background clearance pursuant to this Agreement as well as all completed EXHIBIT F Certifications.
39.2.1. The District reserves the right to audit these records at any time.
39.3. In situations where District pupils are present on the Joint Use Area under District supervision for participation in a program or event specifically directed at District pupils for which the City and District partner together, the City must ensure that only cleared City Personnel are allowed to be present or engage in activities on-site at the Joint Use Area.
For City, City-sponsored organization, and general public events or activities where the District does not have supervisory control over pupils, this requirement shall be waived, provided that the event is not specifically directed at District pupils and does not involve their participation as part of a District program.
39.3.1. Contractors, such as construction workers, engaged in constructing, renovating, modifying, repairing, or demolishing the Joint Use Area, Project, or Improvements shall not interact with District pupils outside of the immediate supervision and control of the pupil’s parent or guardian or a District employee. Accordingly, these individuals will not be required to undergo fingerprinting or criminal background checks, provided that their work is conducted entirely within the Joint Use Area and they do not interact with District pupils without immediate supervision and control of the pupil’s parent or guardian or a District employee.
39.4. The City understands and acknowledges that compliance with these requirements is critical to the safety and well-being of District pupils. Any failure by the City to comply shall be considered a breach of this Agreement and may constitute cause for termination pursuant to Section 7 of this Agreement, provided that the City is unable to cure such violation within 60 calendar days after receipt of such written notice, or within a period that the Parties agree to in writing. The City agrees to indemnify, defend, and hold harmless the District, its Board members, employees, and agents from any and all claims, liabilities, losses, or damages arising out of or related to the City’s failure to comply with these fingerprinting and criminal background investigation requirements.
39.5. Survival. The provisions of this Fingerprinting and Criminal Background Verification section shall survive the termination or expiration of the Agreement.
Joint Use Lease Agreement Page 14 of 26
Garden Grove Unified School District
City of Stanton
40. FORCE MAJEURE. In addition to specific provisions of this Agreement, performance by a Party shall not be deemed to be in default, and all performance or other dates specified in this Agreement shall be extended, where the Party seeking the extension has acted diligently and delays or defaults are due to events beyond the reasonable control of the Party including, without limitation: war; insurrection; strikes; lockouts; riots; floods; earthquakes; fires; casualties; acts of God; limitation of supplies; epidemics; quarantine restrictions; freight embargoes; lack of transportation; litigation; unusually severe weather; acts or omissions of another party; or any other causes beyond the control of or without the fault of the Party claiming an extension of time to perform. Notwithstanding the foregoing, any governmental statute, order, regulation, rule, or equivalent preventing the use of any Joint Use Area as a result of COVID-19 shall not be considered an event beyond the reasonable control of a Party. Notwithstanding anything to the contrary in this Agreement, an extension of time for any such cause shall be for the period of the enforced delay and shall commence to run from the time of the commencement of the cause, if notice by the Party claiming such extension is sent to the other party within ten (10) days of the commencement of the cause.
[SIGNATURE PAGE TO FOLLOW]
Joint Use Lease Agreement Page 15 of 26
Garden Grove Unified School District
City of Stanton
IN WITNESS WHEREOF, the Parties have, by their duly authorized representatives, executed this Agreement, as of the Effective Date set forth above.
Date: ______ ___________, 2025
GARDEN GROVE UNIFIED SCHOOL DISTRICT
By:
Print Name: _______Thanh Phan _________________
Print Title: Assistant Superintendent, Business Services_ Date: ______ ____________, 2025
CITY OF STANTON
By:
Print Name:
Print Title: ___________________________________
APPROVED AS TO FORM:
By:
Print Name:
Print Title: ______City Attorney__________________
ATTEST:
By:
Print Name:
Print Title: City Clerk
Joint Use Lease Agreement Page 16 of 26
Garden Grove Unified School District
City of Stanton
EXHIBIT A
DESCRIPTION OF THE SCHOOL SITE
The District School Site is located at 11150 Santa Rosalia Street in the City of Stanton, County of Orange, State of California, and houses Carver Early Childhood Education Center. The School Site is outlined in blue on the aerial map below.
Joint Use Lease Agreement Page 17 of 26
Garden Grove Unified School District
City of Stanton
EXHIBIT B
GRANT MATERIALS
GRANT APPLICATION AND GRANT CONTRACT
California Department of Parks and Recreation Powered by Submittable Title Norm Ross Sports Complex
Improvement Project
by Zenia Bobadilla in Statewide Parks Program Round 4
[email protected]
03/12/2021
id. 19506532
Checklist Items 1 and 3 - 15 Upload 07/21/2021
Checklist #1 -
Application Form
n/a
Checklist #3 -
Community FactFinder
Report and Handbook
Form
n/a
Checklist #4 -
Authorizing Resolution
n/a
Checklist #5 - Grant Scope/ Cost Estimate Form
Grant_Scope_Cost_Estimate.pdf
Checklist #6 - Funding
Sources Form
n/a
Checklist #7 - Project
Timeline Form
n/a
Checklist #8 -
Applicant Capacity
n/a
Checklist #9 - California Environmental Quality Act (CEQA) Compliance Form CEQA_Compliance_Form_STANTON_REV_07.2021_NOE_Attached.pdf Checklist #10 - Project
Site Ownership,
Acquisition, or Lease
n/a
Checklist #11 -
Concept Level Site
Plan
n/a
Checklist #12 - Photos
and Copyright License
Agreement
n/a
Checklist #13 - Project
Location Map
n/a
Checklist #14 - NONPROFIT APPLICANT
Requirements (only for
NON-PROFIT
APPLICANTS)
n/a
Checklist #15 -
CONSERVATION
CORPS Consultation
Review
n/a
Checklist Items 1 and 3 - 15 Upload 07/09/2021
Checklist #1 -
Application Form
n/a
Checklist #3 -
Community FactFinder
Report and Handbook
Form
n/a
Checklist #4 -
Authorizing Resolution
n/a
Checklist #5 - Grant Scope/ Cost Estimate Form
Grant_Scope_Cost_Estimate_Form_STANTON_Revised_FINAL.docx Checklist #6 - Funding
Sources Form
n/a
Checklist #7 - Project
Timeline Form
n/a
Checklist #8 -
Applicant Capacity
n/a
Checklist #9 - California Environmental Quality Act (CEQA) Compliance Form CEQA_Compliance_Form_STANTON_REV_07.2021_NOE_Attached.pdf Checklist #10 - Project Site Ownership, Acquisition, or Lease Lease_Agreement_Checklist_Norm_Ross.pdf
Checklist #11 - Concept Level Site Plan
Park_Plan-Norm_Ross_Stanton_-_06292021.pdf
Checklist #12 - Photos
and Copyright License
Agreement
n/a
Checklist #13 - Project
Location Map
n/a
Checklist #14 - NONPROFIT APPLICANT
Requirements (only for
NON-PROFIT
APPLICANTS)
n/a
Checklist #15 - CONSERVATION CORPS Consultation Review
CCC_Explanation.pdf
EMail_Exchange_-_City_of_Stanton_-
_CCC_Consultation_Request_Norm_Ross_Sports_Complex_Improvement_Project.pdf Original Submission 03/12/2021
Please provide your
agency name and
project name
Norm Ross Sports Complex Improvement Project
Requested Grant
Amount
$7,691,059
Other Funding Sources
Amount
0 Total Project Cost $7,691,059
Project Site Name
(Name of Current or
Proposed Park)
Norm Ross Sports Complex
Project Site Ownership Available (or will be available) under a lease or easement Number of years site
will be available under
a lease or easement
30 years
Total combined park
acres described above
4.3 Acres
Does your project site
have a physical street
address?
No
Project Site Latitude
and Longitude
11111 Cedar St. Stanton, CA 90680
Project Site Nearest
Cross Streets
Katella Ave. and Beach Blvd.
Project Site County Orange
Authorized
Representative
Jarad
Hildenbrand
Authorized
Representative
Position/Title
City Manager
Authorized
Representative Email
[email protected]
Authorized
Representative Phone
+17148904277
Application Contact Zenia
Bobadilla
Application Contact
Email
[email protected]
Application Contact
Phone
+17148904247
Application Checklist The following is organized by the application checklist per page 11 of the Application Guide.
Checklist #1 - Application Form
Project_Application_Form.pdf
Checklist #2 - Project
Selection Criteria
This section starts on page 14 of the Application Guide covering project selection criteria 1 through 9. Fill in your responses in the boxes below. As a reminder you are able to invite multiple team members to help draft the responses to the Project Selection Criteria. Click here to learn more. Your draft response will auto-save every few seconds, so you don't need to worry about losing your work. The response to this section must be complete by or before March 12, 2021. See the bottom of this page for "submittal" instructions.
PROJECT
SELECTION
CRITERIA #1
n/a
Project Selection
Criteria #1 - Critical
Lack of Park Space
Use the Community FactFinder to provide information about the critical lack of PARK SPACE within PROXIMITY (a half-mile radius) of the PROJECT SITE.
Community FactFinder Community FactFinder Handbook Video of Community FactFinder Tips Scoring rubric found on page page 15 of the Application Guide.
Additional technical assistance is available on page 57 of the Application Guide. A community’s CHALLENGES beyond the park acres per 1,000 residents can be further explained in Criterion 9(A) on page 31.
Ratio of PARK
acreage per 1,000
residents according to
the FactFinder report
1.45 FactFinder Report ID
Number (found on the
top right corner of the
report)
101709
PROJECT
SELECTION
CRITERIA #2
n/a
Project Selection
Criteria #2.A. -
Significant Poverty
Using the same Community FactFinder Report from Project Selection Criteria 1, provide the Median Household Income. Scoring rubric found on page page 16 of the Application Guide. Additional technical assistance is available on page 57 of the Application Guide. A community’s CHALLENGES beyond the median household income can be further explained in Criterion 9(A) on page 31.
Median Household
Income according to
the FactFinder report
$56,885
FactFinder Report ID
Number (found on the
top right corner of the
report)
101709
Project Selection
Criteria #2.B. -
Significant Poverty
Using the same Community FactFinder Report from Project Selection Criteria 1, what is the number of people living below poverty within PROXIMITY of the PROJECT SITE? Scoring rubric found on page page 17 of the Application Guide. Additional technical assistance is available on page 57 of the Application Guide. A community’s CHALLENGES beyond the number of people living in poverty can be further explained in Criterion 9(A) on page 31.
Number of People
Living in Poverty
according to the
FactFinder Report
1,544
FactFinder Report ID
Number (found on the
top right corner of the
report)
101709
PROJECT
SELECTION
CRITERIA #3
n/a
Project Selection
Criteria #3 - Type of
Project
Renovation of an existing park
A) What RECREATION
FEATURE(s) will be
added or renovated in
the existing PARK?
· Installation of new baseball and softball diamond, and multi-purpose field and multi-sport court for basketball, volleyball and pickleball · Group picnic area with picnic tables, grills and shade structures · New biking/walking/jogging trail around perimeter of park site with a bridge · Outdoor exercise equipment · New splash pad · Build new community building · Installation of event plaza with outdoor flex space · Installation of new playground · Installation of community gardens · Benches, water fountains and various furniture elements installed throughout the park · Installation of dog park
B) Why is it not
feasible or desired to
create a NEW PARK
in a CRITICALLY
UNDERSERVED
COMMUNITY, or add
NEW PARK SPACE
ADJACENT to the
proposed PROJECT
SITE?
It is not feasible to create a new park in this area since the City is almost completely built out with few vacant parcels appropriate for outdoor recreational opportunities. Located in the populous County of Orange, the City is surrounded on all sides by other municipalities and various residential, commercial, and industrial land uses. The most cost-effective way to provide the most recreational activities for the surrounding community is to utilize the existing sports complex. Norm Ross Sports Complex connects to the larger adjacent Stanton Park by a pedestrian bridge and walking trails. Although Stanton Park is an additional resource for the community, it does not include sports recreation activities that can be utilized by the community. However, nearby abandoned structures and the poor condition of the complex has led to a lack of use by little leagues, softball leagues, soccer leagues, and Stanton residents.
PROJECT
SELECTION
CRITERIA #4
n/a
OVERVIEW FOR
PROJECT
SELECTION
CRITERIA #4
In section A below describe the meeting location and dates. In section B below describe how residents' "youth, seniors, and families" were invited to the meetings. In section C below describe how residents' ideas were involved for the three design goals on pages 22 - 23 of the Application Guide. Additional technical assistance documents can be found by clicking the links below.
Designing Parks Using Community Based Planning Community Based Planning COVID-19 Guidance
Project Selection
Criteria # 4.A. -
Community Based
Planning
How many meetings occurred in the critically underserved community? Describe why the meeting locations and times were convenient for residents with various employment and family schedules and lack private transportation.
If meetings occurred before June 5, 2018 (passage of Prop 68 Bond Act), they may also be listed for historical reference. Use the chart format below to list the details of each meeting that occurred in the critically underserved community.
List the meetings in order. The meeting number in the left of the table will match each seperate meeting description below.
Table
Criteria 4A - TEST.xlsx
1. Description of why
the meeting (#1 listed
above) location and
time was convenient
for residents with
various employment
and family schedules
and lack private
transportation.
This meeting took place at the Civic Center, 7800 Katella Avenue, to ensure neighboring residents by the site could provide input on the project. The meeting took place on a Monday during our Community Services Commission meeting to ensure that residents could attend without conflicting with normal business hours during the day.
Did you have another
meeting?
Yes
2. Description of why
the meeting (#2 listed
above) location and
time was convenient
for residents with
various employment
and family schedules
and lack private
transportation.
This meeting took place at Norm Ross Sports Complex to allow residents throughout the City as well as those closest to the project location, could provide input on the project. The meeting took place on a Saturday to ensure that residents could attend without conflicting with normal business hours during the week. Residents had an opportunity to walk the proposed site and recommend amenities.
Did you have another
meeting?
Yes
3. Description of why
the meeting (#3 listed
above) location and
time was convenient
for residents with
various employment
and family schedules
and lack private
transportation.
This meeting took place at the Boys & Girls Club of Stanton, 11050 Cedar St. to meet with children, parents, staff and volunteers to provide input on the project. The meeting was held at the end of summer camp programming to reach both children and parents without conflicting with normal business hours. The location was selected to target youth residents and provide a setting for them to comfortably share their ideas among peers.
Did you have another
meeting?
Yes
4. Description of why
the meeting (#4 listed
above) location and
time was convenient
for residents with
various employment
and family schedules
and lack private
transportation.
This meeting took place at the Boys & Girls Club of Stanton, 11050 Cedar St. to meet with children, parents, staff and volunteers to provide input on the project. The meeting was held at the end of summer camp programming to reach both children and parents without conflicting with normal business hours. The location was selected to target youth residents and provide a setting for them to comfortably share their ideas among peers.
Did you have another
meeting?
Yes
5. Description of why
the meeting (#5 listed
above) location and
time was convenient
for residents with
various employment
and family schedules
and lack private
transportation.
This meeting took place at Zuniga Park at 10902 Date Street. This location was selected due to its close proximity to the project site as well as the high density of residents in the area with numerous apartment complexes and multi-housing units within a short walking distance. This ensured more residents could attend to provide input on features and project design. The meeting took place on a Wednesday evening in conjunction with a neighborhood meeting “Talk with the Block” to ensure residents would already be present and could attend without conflicting with their work schedules.
Did you have another
meeting?
Yes
6. Description of why
the meeting (#6 listed
above) location and
time was convenient
for residents with
various employment
and family schedules
and lack private
transportation.
This meeting took place at the Civic Center, 7800 Katella Avenue. This location was selected due to its close proximity to the project site as well as it’s location near a large senior housing complex. The location was chosen to allow seniors to walk to the meeting site without the need for arranging transportation. The meeting took place on a Monday evening to ensure the community could attend without conflicting with their work schedules or evening activities.
Did you have another
meeting?
Yes
7. Description of why
the meeting (#7 listed
above) location and
time was convenient
for residents with
various employment
and family schedules
and lack private
transportation.
This meeting was located at the Project site. The meeting was on-site to provide visual aid to residents on where recreation features would be located.
City Staff and the landscape architect was in attendance to answer any questions from residents. The meeting was an open forum setting allowing residents to express their desire for specific recreational features, location of features and share ideas on beautification and safety. Residents were vocal on location of features along with safety and beautification ideas. They expressed reservations on location of dog park and softball field to ensure resident and park user safety as well as installation of more shade sails due to hot summer days. They desire a wall mural, community garden, preservation of existing mature trees along with planting native landscaping for beautification features.
Did you have another
meeting?
No
Project Selection
Criteria # 4.B. -
Community Based
Planning
For each meeting listed in the response to 4(A), what method(s) did the applicant or partnering community based organization(s) use to invite residents? In the combined set of meetings, was there a broad representation of residents? Structure the response using the chart format below to describe the method of invitation. Include the number and general description of the residents who participated in each meeting. List meetings in the order of the response to 4(A).
Table
Criteria 4B.xlsx
Project Selection
Criteria #4.C.
During the meetings that occurred in the critically underserved community, how were the residents enabled to design the park using Goals 1-3? Overview for Conducting the Meetings.
Goal 1 - Selection of
the RECREATION
FEATURE(S). The
RESIDENTS engaged
in a process to reach a
general agreement on
the selection of the
RECREATION
FEATURE(S) and
design details for
those RECREATION
FEATURE(S).
n/a
Describe the Process
that enabled residents
to identify, prioritize
and select their
preferred Recreation
Features:
As part of the public meetings, the public was asked which features they would like to implement at the renovated facility. To help facilitate discussion regarding different ideas, a list of options was provided to the public. Residents were advised the list was not inclusive and everyone was encouraged to add features not listed. Once a comprehensive list was developed, participants were asked to rank their top choices. Meeting was set up as a roundtable discussion and breakout groups were arranged to allow youth to brainstorm in a comfortable setting. Residents were provided maps and markers to draw and mark features they wanted in the locations they desired.
Design of the selected
RECREATION
FEATURE(S)
n/a
Describe the process
of how the residents
were enabled to
provide design ideas
for their selected
recreation feature(s).
Participants were able to provide notes and information about the specific type of features/aspects of features that they envision. Residents also discussed their ideas with the City’s Parks and Recreation Commission and park designer.
List the residents’
ideas that will be
included in the design
of the recreation
feature(s).
Design ideas included: retaining current uses for soccer and baseball/softball; improved walking trails, both hard and soft paths to accommodate walkers/joggers as well as strollers, wheelchairs and bikes; football; frisbee; tennis courts; racquetball courts; pickleball courts; skate and roller park; water play and splash pads; dog park; science event center; exhibit area with nature classes; butterfly park; senior activities; exercise equipment; activities for those with physical limitations. Residents specifically requested the installation of a community garden, dog park and multi-sport court, which was added in the final design of the project site.
Goal 2 - Location of
the RECREATION
FEATURE(S) within
the Park. The
RESIDENTS engaged
in a process to reach a
general agreement on
the location of
RECREATION
FEATURE(S) within
the PARK.
n/a
Describe the process
that enabled the
residents to express
their preferences for
the location of the
recreation feature(s)
within the park.
At the meetings, City staff gave a short presentation that included a list of ideas and possible locations. Residents were provided poster boards with markers and site maps allowing them to specify where they wanted each recreation feature located. Residents were encouraged to use suggested features only as a guide and asked them to be creative in deciding best locations for recreational features. Residents were asked to present their ideas and explain why they wanted features in specific locations. The setting for each meeting was informal and structured to encourage open discussion among participants.
List the reasons that
will be used for the
location of the
recreation feature(s)
within the park.
Moving softball field slightly to ensure a safe distance between the field and homes nearby. Location of dog park installed away from the main portion of the park to ensure safety of park users.
Goal 3 - Safety and
PARK beautification.
The RESIDENTS
engaged in a process
to provide other PARK
DESIGN ideas,
including solutions for
safe public use, and
PARK beautification
such as landscaping
and public art.
n/a
Describe the process
that enabled the
residents to provide
park design ideas for
safe public use and
park beautification.
Staff asked residents to share their top safety concerns at the project site.
Once safety concerns were identified, there was an open discussion on how best to address each safety concern and what safety measures could be put in place to provide safe access and use of the park. City staff provided a list of possible beautification ideas and asked residents to add to the list of ideas.
Once comprehensive lists were put together, residents were asked to share their favorite specific style of feature they wanted (i.e. style of lighting, benches, water fountains, artwork, etc.). Residents were able to share what kind of artwork they wanted by type, design and possible artist to complete the feature.
List of safe public use
ideas:
Security cameras, increased lighting throughout the park site, increased lighting in parking lot, increased police presence, security guards. Residents requested additional shade sails be installed throughout the park for use during hotter weather. Residents asked that the softball field boundary is far enough away from homes to ensure safety from fly balls, etc. Residents asked that the skate park be secured with gate/fencing to control use. Residents also want the dog park far enough away from the main park areas to ensure safety for children, etc.
List of park
beautification ideas:
Residents want to preserve the existing mature trees if they are healthy enough. City will have arborist review tree health. Residents would also like additional native trees, shrubs and groundcover planted throughout the park.
Residents asked that a large community garden be installed along with an artistic mural on a wall adjacent to the park.
PROJECT
SELECTION
CRITERIA #5
n/a
Project Selection
Criteria #5 -
Employment or
Volunteer
Opportunities
Describe how the project will include employment or volunteer outdoor learning opportunities for residents including youth and/or corps members by answering A and B using the following chart format.
Table
Criteria 5.xlsx
C. Citing the Corps
Consultation Review
Document, what was
the outcome of the
Corps Consultation
Process?
The Corps Consultation Process was followed. Either the CCC or CALCC determined it is feasible to work on the PROJECT should the grant be awarded.
List the agreed
services and cost of
work for each service.
Corpsmembers from the Orange County Conservation Corps and Los Angeles Conservation Corps will assist in the following: Installation of plants and shrubs - $32.50/hr May be able to assist with trees, depending on size- $32.50/hr Clearing debris - $32.50/hr Site Prep - $32.50/hr Demolition of existing facilities - $32.50/hr Prep for installation of new recreational features - $32.50/hr Installation of plants and shrubs - $32.50/hr May be able to assist with trees, depending on size- $32.50/hr Clearing debris - $32.50/hr Site Prep - $32.50/hr Demolition of existing facilities - $32.50/hr Prep for installation of new recreational features - $32.50/hr
PROJECT
SELECTION
CRITERIA #6
n/a
Project Selection
Criteria #6 -
Partnerships or
Committed Funding
Describe partnership assistance given to the applicant beginning with the passage of the Bond Act (June 5, 2018) through project completion, by competing the chart below. If no partners are involved in the project, but the applicant has committed funds, write “See Funding Sources Form” in boxes A and B below. For Column A, please insert an asterisk next to Health Organizations.
Table
Criteria 6.xlsx
PROJECT
SELECTION
CRITERIA #7
n/a
Project Selection
Criteria #7 -
Environmental Design
Describe how the project will provide efficient use of water and other natural resources by answering both (A) and (B) combined, or (C) by itself, to obtain up to 7 points.
A. How will the project
include the following
sustainable
techniques? For the
application to be
eligible, the project
must include, at a
minimum, A(1):
1. Incorporate pervious surfaces or other technique(s) such as bio-swales or grading to capture storm water for infiltration or irrigation, or cleanse storm water before release. 2. Use of water efficient irrigation system that includes a rain sensor, evapotranspiration (ET) controllers, flow sensors, or on-site water recycling that reduces potable water consumption, or the project will not require additional use of water. 3. At least 10% of the materials for project construction will consist of recycled materials, or construction waste will be minimized by the separation and recycling of recoverable materials generated during construction. 4. Landscaping that excludes the use of invasive plants and instead features drought tolerant or climate appropriate non-invasive native turf, trees, shrubs, plants, and ground cover. Also discuss how the landscaping minimizes the use of toxic pesticides and inorganic fertilizers. Use the following chart format to list and describe each sustainable technique in response to (A) above.
Table
Criteria 7A.xlsx
B. How will the project
include the following
additional techniques
that are not listed in
question (A) above?
1. Carbon sequestration tree planting (identify approximately how many trees will be planted). See Greenhouse Gas Emissions Reduction and Carbon Sequestration technical assistance on page 65. If the project will not include tree planting, include one other energy, water, and natural resource conservation technique. 2. Facilitation of safe and reliable drinking water to park visitors if not yet available. If safe and reliable drinking water is already available for park visitors, include one other energy, water, and natural resource conservation technique. 3. One other energy, water, and/or natural resource conservation technique. Use the following chart format to list and describe each sustainable technique for B.
Table
Criteria 7B.xlsx
C. SITES or LEED
Certification:
If A and B above is selected, do not respond to this item. This is a 7 point alternative to A and B.
Will the project include
SITES or LEED
Certification as an
alternative to A and B
above? If so, provide a
plan for achieving
either SITES certified
landscaping or LEED
certified building
construction by
answering the following
questions:
No
PROJECT
SELECTION
CRITERIA #8
n/a
Project Selection
Criteria #8 - Public
Use Fees and Hours of
Operation
Describe how youth, seniors, and families affected by poverty will have daily access to the project site by answering the following:
A. What will be the Sunday through Saturday hours of operation for the overall PARK to accommodate various needs of youth, seniors, and families? - Table
Criteria 8A.xlsx
B. Will the Monday
through Sunday hours
of operation differ for
any recreation
features listed in the
Grant Scope/Cost
Estimate Form?
No (hours are consistent with part A above)
C. Entrance or
membership fees
n/a
Will the public be
charged entrance or
membership fees to
enter the overall park?
The public will not be charged an entrance or membership fee to enter the Sports Complex and associated park area. Some specific recreation features of the Sports Complex will be available for reservation on a fee basis, such as the softball field or soccer fields, but in general the facility itself will be accessible to the public free of charge. There will be no fixed daily, weekly, or monthly fee to use any of the proposed recreation features. Parks are open to the general public on a first-come, first-serve basis and free of charge.
Will entrance, membership, or
league/activity fees be
charged to use a
RECREATION
FEATURE that is a
majority of the TOTAL
PROJECT COST listed
in the Grant
Scope/Cost Estimate
Form?
If a group wants to reserve a facility for an event, they have to complete a reservation form, pay the designated user fee and provide insurance. Nonprofits can reserve facilities for no charge, but must leave a cleaning deposit, and provide insurance. Outside leagues, such as Little League, do not pay for use of the facilities, but they pay for staffing and lights per hour of use.
If so, list each fee,
identify if the fee is
daily, weekly, or
monthly, and explain
why the fee will not
prevent DAILY
ACCESS for youth,
seniors, and families
affected by poverty.
Reservation Fees are as follows: Park Picnic Shelters/Gazebos RSVP - $75.00 flat fee Multi-Purpose Room RSVP - $40.00 per hour Sports Field / Rental with Lights - $50.00 per hour Sports Field / Rental without Lights - $20.00 per hour The park will be open to the general public on a first-come, first-serve basis and free of charge.
PROJECT
SELECTION
CRITERIA #9
n/a
Project Selection
Criterion #9 -
Community
Challenges, Project
Benefits, and
Readiness
Provide responses to A and B below to summarize the PROJECT’S need and benefits. This criterion is designed for the APPLICANT to tell the story about the PROJECT need and benefits not yet covered through Project Selection Criteria 1 through 8. For C below, OGALS will determine the project’s readiness and APPLICANT capacity using information provided in the entire APPLICATION. List only one challenge at a time, there is space for multiple challenges. Challenges is a defined term on page 70 of the Application Guide.
Scoring rubric found on page 32 of the Application Guide. Technical assistance is available on page 67 of the Application Guide.
A. What
CHALLENGES are
present within the
community that
contributes to the need
for the PROJECT?
n/a
1. Challenge Lack of accessible open space and green space Description of
Challenge
The City of Stanton does not have adequate park and open space facilities to satisfy the needs of the community. The City only has one main park with major recreation amenities (Stanton Central Park).The other parks in the City, such as Zuniga Park, Veteran’s Memorial Park, and Harry M. Dotson Park are what are considered “pocket parks” and do not provide any reasonable recreational feature or open space that can be used by the community for recreational opportunities such as team sports or games.
2. Challenge Limited Land Availability – Built Out
Description of
Challenge
The City is almost completely built out with few vacant parcels that would be appropriate for outdoor recreational opportunities. Located in the populous County of Orange, the City is surrounded on all sides by other municipalities and various residential, commercial, and industrial land uses. Developing and sustaining viable outdoor recreational and open space opportunities is vital to the health and prosperity of the residents of the City of Stanton.
Are there additional
CHALLENGES present
within the community
that contributes to the
need for the
PROJECT?
Yes
3. Challenge Adult and Childhood Obesity and Related Diseases Description of the
Challenge
The limited amount of park space available to residents makes promoting active living a challenge in the City. According to the Public Health Advocate, the cities with the highest levels of overweight youth in Orange County are Anaheim at 43.5%, Santa Ana at 46.5% and Stanton is the highest at 51.8%.
Stanton is also listed as the city with the highest poverty rate countywide.
Are there additional
CHALLENGES present
within the community
that contributes to the
need for the
PROJECT?
Yes
4. Challenge Resident Financial Status
Description of the
Challenge
The City’s residents are diverse in economic status. Many do not have the financial resources to pay for memberships to gyms, sports organizations and leagues. According to the Conditions of Children Report for Orange County,
30.4% of children under the age of 18 live in poverty in the City of Stanton.
Poverty is known to contribute to low educational attainment. The City has one of the lowest percentages of children ready for Kindergarten in the County at
42.4%. This Project will allow low to no-cost recreational opportunities for all residents, regardless of economic situation.
Are there additional
CHALLENGES present
within the community
that contributes to the
need for the
PROJECT?
Yes
5. Challenge Negative Environmental Impacts
Description of
Challenge
Norm Ross Sports Complex is in census tract 6059087901 and surrounded by vehicle congestion. The major arterial streets of Katella Ave. and Beach Ave. are within one block of the Complex site. Directly to the west is census tract 6058099101, which has a pollution burden percentile of 90, toxic release of 99, groundwater threats at 89 and hazardous waste listed at 93. Residents exposed to these environmental conditions are more likely to develop serious and chronic health problems directly related to the exposure to pollutants in the air, water and soil.
Are there additional
CHALLENGES present
within the community
that contributes to the
need for the
PROJECT?
Yes
6. Challenge Low Birth Weight
Description of
Challenge
Tract 6058099101 suffers from low birth weight problems, which is ranked above the 96thpercentile in California. Low birth weight risk factors include lowincome, low-education, substance use during pregnancy and exposure to air pollution or contaminated water.
Are there additional
CHALLENGES present
within the community
that contributes to the
need for the
PROJECT?
Yes
7. Challenge Housing Burden
Description of
Challenge
The CalEnvironScreen 3.0 indicates residents living in the census tract 6059087902, one block south of the project site, has a housing burden in the 92ndpercentile. This indicator is the percentage of households in a tract that are both low income and severely burdened by housing costs by paying more than 50% of their income for housing costs.
Are there additional
CHALLENGES present
within the community
that contributes to the
need for the
PROJECT?
Yes
8. Challenge Unemployment
Description of
Challenge
Unemployment is a problem for the area, which is plagued with poverty and linguistic isolation. High unemployment indicates a large number of people without health insurance or medical care. Poor health can make it difficult for one to find work and retain employment. Long term employment is known to cause stress, which may lead to chronic illnesses.
Are there additional
CHALLENGES present
within the community
that contributes to the
need for the
PROJECT?
Yes
9. Challenge Homelessness, Loitering and Illegal Dumping Description of
Challenge
The Project site backs up against a motel adjacent to the currently empty park at the southeastern side of the site. The existing site is not in regular use as a park and does not have proper lighting, which increases loitering, illegal dumping and unwanted activity from transient and/or the homeless population.
Are there additional
CHALLENGES present
within the community
that contributes to the
need for the
PROJECT?
Yes
10. Challenge Inaccessibility to Park
Description of
Challenge
The neighborhood on the south side of the site does not have direct access to the complex. Currently, residents and children living in the area must drive or walk east to Beach Blvd, which is a heavily trafficked 8-lane street, walk down Beach Blvd. approximately ¼ mile to the entrance of the park. This is an approximate 10-minute walk in an area that has high levels of criminal activity and a dangerous environment to walk in due to excessive traffic with a speed limit of 45 mph. The Project will open up a maintenance road that is currently not for public use on the south side of the site. An entrance will be installed with a walk path giving residents direct accessibility to the park without having to use Beach Blvd.
Are there additional
CHALLENGES present
within the community
that contributes to the
need for the
PROJECT?
Yes
11. Challenge Increased Criminal and Gang Activity
Description of
Challenge
The Project site is located in an area within the City referred to as “Crow Village.” This area is known for criminal and gang activity. The amount of criminal and gang activity has increased dramatically in this area, in part due to the dilapidated state of the park site and its lack of use by residents. There is a large gang that operates in the Project site neighborhood referred to as “Crow Village” Criminal Street Gang. Stanton Police have been tracking the activity by this gang specifically due to the severity of crimes. Since PD began tracking the criminal activity by this gang separately, almost 200 serious criminal acts have been committed since 2016. By renovating this site and increasing security measures, the City and Police Department is confident criminal activity will decrease in this area, resulting in an overall safer community while giving residents a safe and beautiful location to engage in recreational activity.
Are there additional
CHALLENGES present
within the community
that contributes to the
need for the
PROJECT?
No
B. How will the
PROJECT benefit the
HEALTH and quality of
life for youth, seniors,
and families by
improving the
community’s
recreational, social,
cultural, environmental,
educational, and
economic conditions?
Recreational
Social
Cultural
Environmental
Educational
Economic
Recreational The rehabilitation of the Sports Complex will result in a variety of enhanced recreational opportunities for the City’s diverse population, including youth, seniors, and families. The new and refurbished and improved sports fields and courts will provide new healthy recreation encouragement for residents of all ages in an accessible way, as an alternative to the current state of the Norm Ross Sports Complex, which is largely inoperable due to a variety of reasons such as field conditions and safety precautions. The proposed Sports Complex improvements will offer safe, affordable, and fun opportunities for communitybuilding for both the youth population, and other members of the community.
The proposed senior center will offer a space for the City’s senior residents to meet and socialize, assisting in breaking the barrier of isolation that seniors can often feel. The new walking/jogging trail will provide a safe place to exercise for parents using strollers as well as providing seniors a flat surfaced place to walk and socialize with their peers. Families will also be able to access a wide range of new family-friendly programming and recreational activities.
Social The revitalization of the Norm Ross Sports Complex will provide a hub for social and recreational activities for all members of the community. The improved Sports Complex will act as a catalyst for continued social growth and positive social experiences for youth, seniors, and families with a wide range of backgrounds. Picnic tables and grills will be included in the park to encourage social gatherings.
Cultural Per the US Census Bureau, the City of Stanton is over 50 percent Latino and 27 percent Asian. Given the diversity of the City’s community, Norm Ross Sports Complex will serve as a space that can bring together residents of varied cultural backgrounds to learn, play, and grow together. One of the most important ways to learn and embrace the culture of other members of the community is through interactive activities such as sports and recreation. This project will bring people together from a wide range of backgrounds for the communal goal of recreation and open space utilization. The open space, picnic tables, grills and shade structures invite people to practice their culture as groups or families in the park. The City will not charge for use of the facilities, unless reserved, allowing small to moderately sized cultural events to be held at the park.
Environmental The new landscaping, including trees, will sequester carbon and reduce GHG while filtering the air of some particulates. The roots of the vegetation will also capture and filter storm water using it to recharge the ground water. This will improve both air and water quality. The park surfaces will primarily be permeable to further reduce storm runoff and improve water quality.
Educational The newly installed sports fields and courts will provide a place for competitive youth sports. The increased enrollment of youth in group athletics will give more students a support group of their peers and additional adult role models. With a larger support system, students have a higher advantage of staying in high school. They may be more inclined to pursue additional education through two-year community college programs, vocational training or four-year college degree programs while they work. Students that are socially isolated are less likely to understand the connection between higher education and breaking the poverty cycle or have hope that they could complete post-secondary education. The open space will provide a place for numerous organizations to host educational events as well as classes on health, nutrition and physical exercise.
Economic The Norm Ross Sports Complex will assist financially challenged members of the community by providing them viable and free recreational opportunities.
Too often, recreation amenities are an unreachable expense for struggling or working-class people. This project will ensure that City of Stanton and surrounding residents have access to free open space and recreational opportunities.
Per page 68 of the
Application Guide,
provide a response as
to how this project will
prevent
"displacement." If
RESIDENTS are not
vulnerable to
"displacement,” explain
why.
The City has several policies and ordinances in place to prevent displacement.
1. Rent Control for Seniors: City creates long-term affordability covenants for housing projects receiving City-sponsored development assistance; Monitor deed-restricted units and maintain contact with owners to extend/renew deed restrictions to maintain affordability; Seek funding at the federal, state and local level to preserve at-risk housing units; City maintains a large senior housing development that maintains affordable rent; City monitors 8 mobile home parks in the City to ensure affordability is maintained.
2. Incentives are provided for high density housing construction
3. Density bonuses for projects with levels of affordability and greater bonus for senior and veteran housing
4. ADU policies: ADU and JADU are allowed by right in all zones that allow residential. City has a streamlined process and do not have regulatory impediments to ADU. The City is working to develop standard plans to relieve the cost of hiring professionals to development structural and engineered drawings related to ADUs.
************* END OF
PROJECT
SELECTION
CRITERIA *************
This marks the end of the Project Selection Criteria. Project Selection Criteria responses must be complete and submitted by March 12th at 11:59 p.m.
Revisions to the Project Selection Criteria will not be accepted after March 12, at 11:59 p.m. See the instruction for submitting at the end of this online application system. The remaining portions of the application are checklist items 3 - 15. If checklist items 1 and 3 - 15 are not complete by March 12, 2021, upload a document that describes the current status, next steps and estimated month that the item will be completed. Please use page 11 of the Application Guide as a reference for the remaining checklist items. Additionally, the Lessons Learned from Round 3 tool should be used to help ensure completion of all items.
Checklist #3 - Community FactFinder Report and Handbook Form Community_FactFinder.pdf
Checklist #4 - Authorizing Resolution
2021-05_SPP_Round_4_Grant_Resolution_02-23-2021.pdf
Checklist #5 - Grant Scope/ Cost Estimate Form
Grant_Scope_Cost_Estimate.pdf
Checklist #6 - Funding Sources Form
Funding_Sources.pdf
Checklist #7 - Project Timeline Form
Project_Timeline.pdf
Checklist #8 - Applicant Capacity
Applicant_Capacity_STANTON_FINAL.pdf
Checklist #9 - California Environmental Quality Act (CEQA) CEQA_Compliance_Final.pdf
Checklist #10 - Project Site Ownership, Acquisition, Lease, or Turnkey GGUSD_-_City_of_Stanton_Joint_Use_Agreement.pdf
GGUSD_-_Stanton_Amendment_6_-_2018.pdf
GGUSD-Signed_Letter_of_Intent.pdf
Checklist #11 - Concept Level Site Plan
Final_Concept_Plan_March_2021.pdf
Checklist #12 - Photos and Copyright License Agreement
Norm_Ross_Sports_Complex.jpg
Norm_Ross_Sports_Complex_Dugout.jpg
Norm_Ross_Sports_Complex_East_adjacent_to_motel_riverbed.jpg Norm_Ross_Sports_Complex_North_Side.jpg
Norm_Ross_Sports_Complex_Panoramic_South_Side.jpg
Norm_Ross_Sports_Complex_Panoramic.jpg
Norm_Ross_Sports_Complex_West_Community_Garden.jpg
Norm_Ross_Sports_Complex_West.jpg
July_2_2019_BoysGirls_Club.JPG
July2_2019_BoysGirls_Club-Design_Your_Own_Park_Instructions.JPG July_10_2019_Zuniga_Park_Community_Meeting_CS_DIrector_City_Manager_Chief_of_Police.jpg July_102019_Zuniga_Park_Reviewing_Handouts_and_Survey.jpg November_16_2020_Norm_Ross_Sports_Complex_Marking_Up_Site_Plan.JPG November_16_2020_Norm_Ross_Sports_Complex_Requests_from_Public_for_Security_Fencing.JPG November_162020_Norm_Ross_Sports_Complex_Site_Walk_Through.JPG November_162020_Norm_Ross_Sports_Complex_walkthrough_near_south_end_adjacent_to_Crow_Village.JPG Copyright_License_Form.pdf
June_222019_Norm_Ross_Sports_Complex.jpg
June_222019_Video.MOV
Community_Based_Planning_Video_July_2_2019_Boys_Girls_Club.mov Checklist #13 - Project Location Map
Norm_Ross_Project_Site_Map.jpg
Checklist #14 - NONPROFIT APPLICANT
Requirements (only for
NON-PROFIT
APPLICANTS)
n/a
Checklist #15 - CONSERVATION CORPS Consultation Review
CCC_-_City_of_Stanton_-
_CCC_Consultation_Request_Norm_Ross_Sports_Complex_Improvement_Project.pdf Local_CCC_-_City_of_Stanton_-
_CCC_Consultation_Request_Norm_Ross_Sports_Complex_Improvement_Project-Feasible.pdf End of Application
Checklist Items 1 - 15
n/a
Submitting the
application by or
before March 12, 2021
Please only click the submit button below when you are ready to submit your application package. Project Selection Criteria pages 14– 31 of the Application Guide responses must be complete by March 12th at 11:59 p.m. Revisions to the Project Selection Criteria will not be accepted after March 12, at 11:59 p.m.
Please use the Lessons Learned from Round 3 tool to help ensure all items were completed properly. If you have any questions you can email your Competitive Review Project Officer for your County. In all cases the Submit Round 4 button below must be clicked by or before March 12, 2021. Thank you for your participation in the Statewide Park Program!
Lease Agreement Form Checklist
If the APPLICANT does not own the land in fee simple, and is not going to acquire the land to become the land owner, complete this checklist. Attach a copy of the signed Agreement between the land owner and APPLICANT. Identify the page numbers where the following information can be found in the Agreement and highlight the provisions in the Agreement where the information is located. All items are required.
Applicant:
Project Name:
✓ Page Required Item
□
Type of agreement: For example: lease, joint powers agreement, easement, memorandum of understanding, etc.
____________________________________________________
□
Parties to the agreement and date signed:
Party Date Signed
__________________________________ ________________
__________________________________ ________________
__________________________________ ________________
□ Term of the agreement: ____ years from ______ to ______ □
Agreement Start date:__________ End date: _______________ • SPP grants require at least 30 years of site control for GRANTEEs to operate and maintain the site for public recreational use. • The 30 years begins on the APPROPRIATION DATE.
□
Renewal option: The agreement must include an option, which can be non-binding, for the GRANTEE to renew the agreement beyond the original 30 year term.
□
Termination clause: Any of the following is acceptable:
• No termination clause – the agreement is non-revocable. • Termination clause specifies the agreement is revocable only for cause. • The termination clause cannot allow the land owner to revoke the agreement without cause, i.e., at will.
□
Site Control, Roles and Responsibilities should the GRANT be awarded:
• The agreement authorizes the GRANTEE to proceed with the construction PROJECT. The GRANTEE may delegate construction to other entities. • The agreement establishes when the general public can use the PROJECT and gives GRANTEE permission to operate the PROJECT SITE (such as scheduling recreational programs). The GRANTEE may delegate operational roles to other entities but is bound through the CONTRACT provisions to ensure full public access for the duration of the land tenure period. • The agreement identifies which entity will maintain the PROJECT SITE. The GRANTEE may delegate maintenance to other entities but is bound through the CONTRACT provisions to ensure maintenance of the PROJECT SITE for the duration of the land tenure period.
3 M,
U
C .
U
C
w •
o
U
r
a
N
U
C >
o
c
o
c
U
o
U
o
0 o
o
a
ca
N
q
v °
c
ti
D
o
a
3 0
cl
rZ ^
n
Y '
K
L
U
y
w
Y
9 V
cd ° '
U
C
N .
0 O .
O
N
U •
a
z
a
c
O
F
v
3 n
o
o
m
O
U
a
a
3 a
Y °
3 c °
Q
O
N
O
M
bA
0 N ..'.
in
Q
c
N
E
U
a _
Mo
o
o
Y
N
E
a
w
v1
Z
ltl
lC
O
O
C ^'
N
y
O "
Y
N
O
3 '
o
C
C
O
v •
a
O
aA
o
T
o
3 '
3 N
O
N
E ,
c
F
cl
a
V -
N •>°',
oA
bo
o °
o
O ° `' "'
c
M
ny '
L
a °' °
o
00 0
M
Z
o
o
U
ca
N
W
y
ti
W .
a
z
m
cd
U
o "
a
v •
o
w
va
W
W
O
a
cl
Y
u:.
Y
c
p
o,
O
W
Z
W >
c
ro
C "
a
o
a
o
CD
a
Q
O
a
u
00 fz
H
U
F
k
O
H >
w
Q
c
GA
J
c
v °
E
c
h '°
o
x
yr
U
a
a
CIO
q
z
J
W
q
i
Q
N°
E °
bA >
W
ro °
b
3 0
F >
ro
ti
qW
q
U °
I.-
o
v
o
W
t°
0 x >°
o >
o °
F
c
or
h
a >
a°
c
t
bcA
p.
o
a
i ° •
E '
U `
ti
U '
F
E
CG
U
aci
ti
GA
y
Q
o
n =
x
c
v •
o
o
X
o ,
X
c
z
c
y
w
N
bA
o
n.
o
o
c
V
x a
0 oE
ax °
cv
c
d'
U
v .
N --
F
q
W
U
aA
xi ° ° .
n
q
E
o. ° '
tr;
t ] °
CQ7
q
8 El y
0 Yac F
1'
q O
v aa N)
Q
0 v
U Q 0O
AMENDMENT #6
ORIGINAL
MULTI-PURPOSE RECREATIONAL FACILITY
CARVER ELEMENTARY SCHOOL
THIS AMENDMENT TO AGREEMENT is made and entered into this 15th day of May. 2018, by and between the CITY OF STANTON, a municipal corporation, hereinafter designated as " CITY", and the GARDEN GROVE UNIFIED SCHOOL DISTRICT, a public school district, hereinafter designated as " DISTRICT".
RECITALS
TERM:
1. The parties hereto previously entered into an agreement dated July 12, 1983 Agreement"), concerning a 4. 3 acre portion ( Exhibit " A" to Agreement) of District' s Carver Elementary School, owned by the DISTRICT, and located at 11150 Santa Rosalia Street, in the City of Stanton (the " Property").
2. The parties amended the agreement on July 12, 1993 which extended the term of the agreement for five years each, on June 30, 1998, June 30, 2003, June 30, 2008, and again on June 4, 2013, which extended the term of the agreement an additional five years revising the termination date ending June 30, 2018.
3. It is intended by this Amendment to the Agreement to extend the term another five years commencing on July 1, 2018 and ending June 30, 2023.
4. The California Education Code Section 17051 authorizes the joint exercise by agreement between two or more local public agencies of any power common to them, and both CITY and DISTRICT possess power to establish recreational areas within their jurisdiction.
COMMUNITY GARDEN:
1. CITY desires to establish a community garden for public use on a triangular portion of the Property between the Norm Ross Sports Complex, located at 111 I 1 Cedar St. in Stanton, and the Property depicted in Exhibit 1, as attached hereto and incorporated herein by reference (the " Garden Area"). It is also intended by this Amendment to the Agreement for DISTRICT to allow the CITY or its designee to improve the Garden Area to establish a community garden for public use, INDEMNIFICATION:
1. Agreement allows for the upward adjustments to the level of liability protection for the term of this and any subsequent agreements for the joint use of said recreational facility.
THE PARTIES MUTUALLY AGREE AS FOLLOWS:
1. DISTRICT and CITY agree that the term of this agreement shall be extended for a period of five years commencing July 1, 2018 and ending June 30, 2023.
2. DISTRICT AND CITY agree that CITY may establish a community garden for public use on the Garden Area. DISTRICT agrees to provide CITY, its employees, officials, agents, representatives, successors, assigns, and designees a perpetual, nonexclusive easement to access in, on, over, across, and under the Garden Area as well as to improve, use, maintain, and repair the Garden Area for public use. CITY and/or its designee shall be solely responsible for making any and all improvements to establish and maintain such garden, including, without limitation, installing a gate off of Cedar Street, installing irrigation improvements and making any and all other related repairs to the Garden Area.
3. Access to the Garden Area shall only be from the access gate adjacent to the Norm Ross Sports Complex off of Cedar Street. The Garden Area shall not be accessed from Carver Elementary School.
4. The Garden Area' s utility costs shall be borne as follows: DISTRICT shall pay for all water utility costs associated with the Garden Area. CITY shall pay for all electric utility costs including, without limitation, lighting, and any other maintenance costs associated with the Garden Area.
5. There shall be no sale of any vegetation grown from the garden activities from the Garden Area without obtaining prior written consent from DISTRICT.
6. Plants that are considered invasive species, including but not limited to sugar cane and bamboo, shall not be planted in the Garden Area.
7. CITY shall have the authority to sublease to, in its sole discretion, a community non-profit organization to use, improve, maintain, and manage the Garden Area. In the event CITY subleases to a community non-profit organization to use, improve, maintain, and manage the Garden Area, CITY shall cause the non-profit organization to indemnify DISTRICT for the organization' s use and to add DISTRICT as an additional insured to its insurance policy.
Except as expressly hereinafter amended or previously amended, said agreement between the parties covered by the agreement dated July 12, 1983 shall remain in full force and effect except as modified by this amendment.
GARDEN GROVE UNIFIED SCHOOL
DISTRICT
By: 2 2d
Rick Nakan
Assistant Superintendent, Business Services
Date: May 16, 2018
Board Approved: May 15, 2018
2 CITY OF STANTON
I
Date:Y
Approved or
City Attorney
JG'
P
C.)
Z k
u
s .. y
w .__ j ___ _ y. ,. i. ..
California Department of Parks and Recreation: Statewide Park Development and Community Revitalization Program (Proposition 68)
Applicant Capacity
City of Stanton
Construction Projects
Project A
Annual Overlay Project – Harry Dotson Park
Project Address: 10350 Fern Ave., Stanton, CA 90680
Scope of Work: Overlay of city streets with two inches of new asphalt, including all related concrete work, striping, and signal loop construction
Total Project Cost: $1,200,000
Funding Sources:
Measure M $650,000
Road Maintenance Rehabilitation
Account (RMRA) $500,000
Gas Tax $50,000
Start Date: November 2018
Date of Completion: April 2019
Project B
Stanton Central Park Creation
Project Address: 10660 Western Ave., Stanton, CA 90680
Scope of Work: Development of a new 11-acre park including softball field, soccer field, splash pad, train play structure, restroom, community building, walking path, butterfly garden, exercise equipment, horseshoe pits, and picnic shelters.
Total Project Cost: $11,100,000
Funding Sources:
Bonds $7,000,000
Proposition 87 Grant $2,900,000
Park in Lieu Fees $1,200,000
Start Date: May 2015
Date of Completion: September 2016
California Department of Parks and Recreation: Statewide Park Development and Community Revitalization Program (Proposition 68)
Project C
Harry Dotson Park Creation
Project Address: 10350 Fern Ave., Stanton, CA 90680
Scope of Work: Development of a new one-acre park including splash pad, shade structures, picnic area, bio-swale, restroom, pirate ship play structure, and walking path.
Total Project Cost: $2,241,000
Funding Sources:
CDBG Funds $512,155
Park in Lieu Fees $1,090,000
Proposition 40 & 12 Funds $915,000
Start Date: May 2008
Date of Completion: January 2009
Operations and Maintenance
O & M Expense Description Monthly Cost Annual Cost
Utilities $2,800 $33,600
Staffing Costs $6,200 $74,400
Routine Repairs/Upkeep $3,500 $42,000
Funding Sources to Operate and Maintain Project
The planned funding sources to operate and maintain the proposed Project is the General Fund.
The General Fund contains the revenue and expenses for the Parks & Recreation Department and all of its divisions. All revenue and expenses pertaining to this project will be handled by the Parks and Recreation Department. The Department maintains approximately 26.4 acres of parks, park grounds and facilities. The operational costs consist of line items such as Salaries, Utilities, Professional Services, Operating Supplies, Repair and Maintenance Supplies, and Staff Training.
Weblink to Parks and Facilities City Oversees
http://ci.stanton.ca.us/Departments/Community-Services/Parks-and-Facilities
Included in OGALS Letter, dated June 11, 2021:
• Conservation Corps Consultation Review (optional) (Page 51) It is not clear that the Conservation Corps consultation process as described on page 51 of the Application Guide was followed. Please provide the following information:
1. Was the “Proposition 68 Corps Consultation Review Document” sent to both the CCC and CALCC contact?
a. If yes, please confirm the estimated date when the form was sent to both contacts.
2. What is the current plan to use, or not use, services by either the CCC and/or CALCC should the grant be awarded? Include answers to a-c below:
a. Is there a current agreed scope of work for the CCC and/or CALCC? b. Is there a current agreed cost for that work?
c. Approximately how many crew members would be used according to either the CCC and/or CALCC?
City of Stanton Response:
Conservation Corps Consultation Review
a. The Conservation Corps consultation process was followed, and the “Proposition 68 Corps Consultation Review Document” was sent to both the CCC and CALCC contact along with map and concept plan on February 24, 2021.
b. The City of Stanton is planning to use the services of the Local CCC Pomona Center upon grant approval.
c. Duane Wilson, Director of the Pomona Center indicated they would be able to assist with providing services for the project. There isn’t an agreed scope of work or cost at this time, but Mr. Wilson provided an estimated cost for services and along with scope.
See attached “Email Exchange” that provides details of estimated number of hours and total cost per Duane Wilson.
7/9/2021 California Consulting Mail - City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) https://mail.google.com/mail/u/2?ik=88047b90a0&view=pt&search=all&permthid=thread-a%3Ar5273147216757699949&simpl=msg-a%3Ar700899498… 1/7 Shari Edghill <[email protected]>
City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project)
9 messages
Shari Edghill <[email protected]> Wed, Feb 24, 2021 at 10:34 AM To: [email protected], [email protected] Cc: "Bobadilla, Zenia" <[email protected]>
Please see the attached Corps Consultation Review Document for the City of Stanton on their " Norm Ross Sports Complex Improvement Project." An application is being submitted to the California Department of Parks and Statewide Park Development and Community Revitalization Program Round 4 under Proposition 68. Site Plan and Location Map are also attached.
Best Regards,
--
Shari Edghill
Project Manager
California Consulting, Inc.
214 Main Street, Suite 102
El Segundo, CA 90245
Main Phone Cell: 559.908.3700
Office: 323.728.9002
www.californiaconsulting.org
This electronic transmission, and any documents attached hereto, may contain confidential and/or legally privileged information. The information is intended for the sole use of the recipient named above. If you have received this electronic message in error, please notify the sender and delete the electronic message. Any disclosure, copying, distribution, or use of the contents of this information received in error is strictly prohibited. 3 attachments
Location Map - City of Stanton.jpg
130K
Prop-68-Corps-Consultation-Form-(STANTON)_v1se.pdf
717K
Final Concept Plan - City of Stanton.pdf
8989K
Dills, Madeline@CCC <[email protected]> Wed, Feb 24, 2021 at 6:14 PM To: Shari Edghill <[email protected]>
7/9/2021 California Consulting Mail - City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) https://mail.google.com/mail/u/2?ik=88047b90a0&view=pt&search=all&permthid=thread-a%3Ar5273147216757699949&simpl=msg-a%3Ar700899498… 2/7 Cc: "Bobadilla, Zenia" <[email protected]>, "Prop68@CCC" <[email protected]>, "[email protected]" <[email protected]> Hi Shari,
Thank you for reaching out to the CA Conservation Corps to initiate the Corps Consultation Process. We are looking into your request and will respond to you by COB Wednesday, March 10, 2021.
Best,
MADELINE DILLS
Staff Services Analyst
Emergency and Environmental Programs
1719 24th Street
Sacramento, CA 95816
C: (510) 506-0522
[email protected]
From: Shari Edghill <[email protected]>
Sent: Wednesday, February 24, 2021 7:34 AM
To: Prop68@CCC <[email protected]>; [email protected] Cc: Bobadilla, Zenia <[email protected]>
Subject: City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) Please see the attached Corps Consultation Review Document for the City of Stanton on their " Norm Ross Sports Complex Improvement Project." An application is being submitted to the California Department of Parks and Statewide Park Development and Community Revitalization Program Round 4 under Proposition 68. Site Plan and Location Map are also attached.
Best Regards,
--
7/9/2021 California Consulting Mail - City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) https://mail.google.com/mail/u/2?ik=88047b90a0&view=pt&search=all&permthid=thread-a%3Ar5273147216757699949&simpl=msg-a%3Ar700899498… 3/7 Shari Edghill
Project Manager
California Consulting, Inc.
214 Main Street, Suite 102
El Segundo, CA 90245
Main Phone Cell: 559.908.3700
Office: 323.728.9002
www.californiaconsulting.org
[Quoted text hidden]
Natalie Vergara <[email protected]> Wed, Mar 3, 2021 at 12:02 PM To: Shari Edghill <[email protected]>, "[email protected]" <[email protected]> Cc: "Bobadilla, Zenia" <[email protected]>
Hi Shari,
The Local Corps are able to assist with this project. Please include the attached document in your application.
Best of luck,
Natalie
From: Shari Edghill <[email protected]>
Sent: Wednesday, February 24, 2021 7:34 AM
To: [email protected] <[email protected]>; Natalie Vergara <[email protected]> Cc: Bobadilla, Zenia <[email protected]>
Subject: City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) Please see the attached Corps Consultation Review Document for the City of Stanton on their " Norm Ross Sports Complex Improvement Project." An application is being submitted to the California Department of Parks and Statewide Park Development and Community Revitalization Program Round 4 under Proposition 68. Site Plan and Location Map are also attached.
[Quoted text hidden]
CALCC Prop 68 Consultation Response - Feasible - (Rev. Jan. 2021) (3).docx 66K
Shari Edghill <[email protected]> Wed, Mar 3, 2021 at 12:15 PM To: Natalie Vergara <[email protected]>
Thank you Natalie.
[Quoted text hidden]
Shari Edghill <[email protected]> Tue, Mar 9, 2021 at 4:43 PM To: Natalie Vergara <[email protected]>
Cc: "[email protected]" <[email protected]>, "Bobadilla, Zenia" <[email protected]> 7/9/2021 California Consulting Mail - City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) https://mail.google.com/mail/u/2?ik=88047b90a0&view=pt&search=all&permthid=thread-a%3Ar5273147216757699949&simpl=msg-a%3Ar700899498… 4/7 Thank you. The SPP application asks us to provide a cost of work for each service. What information do you need in order to provide those details?
On Wed, Mar 3, 2021 at 12:02 PM Natalie Vergara <[email protected]> wrote:
[Quoted text hidden]
Prop68@CCC <[email protected]> Tue, Mar 9, 2021 at 7:53 PM To: Shari Edghill <[email protected]>, "[email protected]" <[email protected]>
Cc: "Bobadilla, Zenia" <[email protected]>, "Wilson, Duane@CCC" <[email protected]> Hi Shari,
The CCC Pomona Center has reviewed your project and determined that it is feasible for CCC services to be used. See attached for how we can assist. Additional information is needed to provide a cost estimate.
Please contact the District Director of the Pomona Center to discuss costs and coordinate the planning of CCC involvement in this project, and reach out again if your project receives funding:
Duane Wilson, District Director
Email: [email protected]
Phone: (909) 594-4206
Thank you again for consulting with us on your Norm Ross Sports Complex Improvement Project. Please include the attached Corps Consultation Review Document with your application as official confirmation that you have consulted with the CCC.
Best regards,
ANDREA GABRIEL
Bond Program Analyst & Corps Consultation Liaison
Bonds & Grants Unit
Emergency & Environmental Programs
1719 24
th Street
Sacramento, CA 95816
P: (916) 341-3272
[email protected]
[email protected]
[email protected]
7/9/2021 California Consulting Mail - City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) https://mail.google.com/mail/u/2?ik=88047b90a0&view=pt&search=all&permthid=thread-a%3Ar5273147216757699949&simpl=msg-a%3Ar700899498… 5/7 ccc.ca.gov
From: Shari Edghill <[email protected]>
Sent: Wednesday, February 24, 2021 7:34 AM
To: Prop68@CCC <[email protected]>; [email protected] Cc: Bobadilla, Zenia <[email protected]>
Subject: City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) Please see the attached Corps Consultation Review Document for the City of Stanton on their " Norm Ross Sports Complex Improvement Project." An application is being submitted to the California Department of Parks and Statewide Park Development and Community Revitalization Program Round 4 under Proposition 68. Site Plan and Location Map are also attached.
Best Regards,
--
Shari Edghill
Project Manager
California Consulting, Inc.
214 Main Street, Suite 102
El Segundo, CA 90245
Main Phone Cell: 559.908.3700
Office: 323.728.9002
www.californiaconsulting.org
[Quoted text hidden]
CCC Prop 68 Consultation Response - Feasible - Norm Ross Sports Complex Improvement.pdf 215K
Natalie Vergara <[email protected]> Tue, Mar 9, 2021 at 7:56 PM To: Shari Edghill <[email protected]>
Cc: "[email protected]" <[email protected]>, "Bobadilla, Zenia" <[email protected]> Hi Shari,
7/9/2021 California Consulting Mail - City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) https://mail.google.com/mail/u/2?ik=88047b90a0&view=pt&search=all&permthid=thread-a%3Ar5273147216757699949&simpl=msg-a%3Ar700899498… 6/7 Please contact the corps to discuss costs and coordinate the planning of Corps involvement in this project, and reach out again if your project receives funding:
Josh Volp
Email: [email protected]
Thanks,
Natalie
From: Shari Edghill <[email protected]>
Sent: Tuesday, March 9, 2021 1:43 PM
To: Natalie Vergara <[email protected]>
Cc: [email protected] <[email protected]>; Bobadilla, Zenia <[email protected]> Subject: Re: City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) [Quoted text hidden]
Shari Edghill <[email protected]> Wed, Mar 10, 2021 at 8:52 AM To: "Prop68@CCC" <[email protected]>
Cc: "[email protected]" <[email protected]>, "Bobadilla, Zenia" <[email protected]>, "Wilson, Duane@CCC" <[email protected]> Thank you Duane. What information do you need in order to provide a cost of the work for each service? We would like to include this information in our SPP application at the request of OGALS. [Quoted text hidden]
Wilson, Duane@CCC <[email protected]> Wed, Mar 10, 2021 at 11:04 AM To: Shari Edghill <[email protected]>, "Prop68@CCC" <[email protected]> Cc: "[email protected]" <[email protected]>, "Bobadilla, Zenia" <[email protected]>, "Wilson, Duane@CCC" <[email protected]> Shari,
It would be very difficult for CCC because we are not contractors and the cost varies depending on funding sources and the fact that some projects are more technical for our members. I would suggest using the rate sheet and identifying what specific task you would like the CCC to assist with. In most cases we finish much faster than what the cost sheet will afford. In this case we disencumber remining funds and you can redirect that saving to another part of your projects. In the list of portions of the project that we would like to assist with we would not be able to say how long it would take especially since we do not have all the scope specifics regarding amounts, sizes, weight, degree of difficulties, distances, yardage, etc.. . In most cases the consultant and/or City would consult the contractor or a City employee to establish a time line for unskilled labor and adjust the hourly rate accordingly. Please see the task that CCC would be willing to assist with below.
Based on 4 day work week w/10 hour days. 10 & 5-person crew for total Labor hrs @ $32.50 w/10 Person Crew 400hrs
7/9/2021 California Consulting Mail - City of Stanton - CCC Consultation Request (Norm Ross Sports Complex Improvement Project) https://mail.google.com/mail/u/2?ik=88047b90a0&view=pt&search=all&permthid=thread-a%3Ar5273147216757699949&simpl=msg-a%3Ar700899498… 7/7 $13,000.00
Labor hrs @ $32.50 w/5 Person Crew
200hrs
$ 6,500.00
No Supervisor and/or Crewleader cost $ - $ -
Sub Total $ 13,000.00 $ 6,500.00
CCC Los Angeles would like to assist with the following task; clearing debris
site prep
demolition of existing facilities
Prep for installation of new recreational features
Planting of vegetation per landscape designs
Cleaning and prepping the existing facilities for renovations. [Quoted text hidden]
RESOLUTION NO. 2021-05
RESOLUTION NO. 2021-05
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF STANTON, CALIFORNIA,
APPROVING THE APPLICATION FOR STATEWIDE PARK DEVELOPMENT AND
COMMUNITY REVITALIZATION PROGRAM GRANT FUNDS
WHEREAS, the State Department of Parks and Recreation has been delegated the responsibility by the Legislature of the State of California for the administration of the Statewide Park Development and Community Revitalization Grant Program, setting up necessary procedures governing the application; and
WHEREAS, said procedures established by the State Department of Parks and Recreation require the Applicant to certify by resolution the approval of the application before submission of said application to the State; and WHEREAS, successful Applicants will enter into a contract with the State of California to complete the Grant Scope project.
NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL HEREBY:
APPROVES THE FILING OF AN APPLICATION FOR THE NORM ROSS SPORTS COMPLEX; AND
1. Certifies that said Applicant has or will have available, prior to commencement of any work on the project included in this application, the sufficient funds to complete the project; and
2. Certifies that if the project is awarded, the Applicant has or will have sufficient funds to operate and maintain the project, and
3. Certifies that the Applicant has reviewed, understands, and agrees to the General Provisions contained in the contract shown in the Grant Administration Guide; and
4. Delegates the authority to the City Manager to conduct all negotiations, sign and submit all documents, including, but not limited to applications, agreements, amendments, and payment requests, which may be necessary for the completion of the Grant Scope; and
5. Agrees to comply with all applicable federal, state and local laws, ordinances, rules, regulations and guidelines.
6. Will consider promoting inclusion per Public Resources Code §80001(b)(8 AG).
ADOPTED, SIGNED AND APPROVED this 23rd day of February, 2021. _____________________________________
DAVID J. SHAWVER, MAYOR
RESOLUTION NO. 2021-05
APPROVED AS TO FORM:
______________________________________
HONGDAO NGUYEN, CITY ATTORNEY
ATTEST:
I, PATRICIA A. VAZQUEZ, City Clerk of the City of Stanton, California DO HEREBY CERTIFY that the foregoing Resolution, being Resolution No. 2021-05 has been duly signed by the Mayor and attested by the City Clerk, all at a regular meeting of the Stanton City Council, held on February 23, 2021 and that the same was adopted, signed and approved by the following vote to wit:
AYES: Shawver, Taylor, Van
NOES: None
ABSENT: Ramirez, Warren
ABSTAIN: None
PATRICIA A. VAZQUEZ, CITY CLERK
Meeting
Date/Year
Meeting Type, Venue,
Address
Start Time - End
Time (am/pm) Day of Week
1 June 17, 2019
Type: Community
Outreach Meeting 6:30pm-8:30pm Monday
2 June 22, 2019
Type: Community
Outreach Meeting 10:00am-12:00pm Saturday
3 July 2,2019
Type: Community
Outreach 5:00pm-7:00pm Wednesday
4 July 10, 2019
Type: Community
Outreach Meeting 6:00pm-8:00pm Wednesday
5 July 15, 2019
Type: Community
Outreach Meeting 6:30pm-8:00pm Monday
6 November 16,
2020
Type: Community
Outreach Meeting 4:00pm – 5:00pm Monday
Meeting Date/Year Description of the method(s) used to invite residents to this meeting. (up to 25 words)
Number of
residents
General description of the residents (youth,
seniors, families or other groups) who
participated in this meeting. (up to 25 words)
1 June 17, 2019
This meeting was promoted and residents were
invited via the City’s weekly newsletter email, social 7 Adults, seniors and you 2 June 22, 2019
This meeting was promoted and residents were
invited via the City’s weekly newsletter email, social 8 Adults, seniors and youth 3 July 2, 2019
This meeting was promoted and residents were
invited via the City’s weekly newsletter email, social 39 Adults, seniors and youth with a focus on
the youth residents due to its location at
4 July 10, 2019
This meeting was promoted and residents were
invited via the City’s weekly newsletter email, social 33 Adults, seniors and youth 5 July 15, 2019
This meeting was promoted and residents were
invited via the City’s weekly newsletter email, social 10 Adults, seniors and youth, with a focus on
our senior population due to its proximity
6 November 16, 2020
This meeting was promoted and residents were
invited via the City’s weekly newsletter email, social 11 Adults, seniors and youth Total 108
A. Brief Description of the Meaningful Employment or Volunteer outdoor learning opportunities for residents and/or corpsmembers between June 5, 2018 until project completion (up to 50 words per opportunity)
B.Number of
residents and/or
corpsmembers
1 Volunteers of all ages will participate in planting trees, shrubs, bushes and flowers as well as installation of the community garden. 40 2 Boys and Girls Club will help the artists complete the community artwork for the project. The artist designing the project will also be volunteering their time to complete the project and oversee the youth volunteers. 30 3 The CCC will provide Corpmembers for site preparation during construction as well as assisting with installation of amenities as deemed appropriate. 5-10
4 5
6 7
8 9
10 A.
Name and General Purpose of Organization.
Add * next to the health organization. (up to 25
words)
B. Describe partnership role specific to this project providing volunteer hours, or materials, or funding for design, pre-construction, land aquistion or construction between the passage of the bond act and project completion. (up to 50 words per partnership)
1 Boys & Girls Club of Stanton
They will provide volunteers to assist with the art projects under the leadership of the artist/designer. They assisted with outreach for community engagement and will partner with the City with programming once the Project is completed. 2 Stanton Community Foundation They will recruit volunteers to install and maintain the community garden. 3 Dr. Riba’s Health Club of Orange County
They have attended all community engagement events and have promoted the project to their contacts throughout the community. They offer exercise and nutrition programs along with healthy lifestyle classes and demonstrations for youth at risk for childhood obesity and diabetes. They will provide educational programming with an emphasis on physical activity, nutrition education and healthy lifestyle classes and demonstrations for youth at risk for childhood obesity and Type 2 Diabetes.
4 5
6 7
8 9
10 11
12 13
14 15
Sustainable Technique (up to 10 words) Description of the sustainable technique (up to 50 words) 1 Pervious surfaces
Parking lot, paths and pool decking will be semi-permeable concrete pavement to allow water to seep through surface reaching soil beneath for groundwater recharge. Site grading will include bioswales and stormwater best management practice.
Infiltration of stormwater will be the preferred method of treatment. 2 Water efficient irrigation systems
The project irrigation design will include a water efficient irrigation system that includes rain sensor evapotranspiration (ET) controllers, flow sensors, and where practical on-site water recycling. 3 Use of recycled materials for construction
Contractor bid will require separate construction waste from recyclable or reclaimable materials. Project specifications will include at least 10% of project construction materials consisting of recycled materials. Construction waste will be minimized by separating recycled materials during construction.
4 Drought-tolerant, climate-appropriate, non-invasive plantings Project will plant approximately 10 new drought-tolerant trees and 50+ drought tolerant plants and. Plantings will result in decreased air pollution through carbon sequestration and will minimize use of toxic pesticides and inorganic fertilizers. Project landscape planting will exclude the use of invasive plant species.
Sustainable Technique (up to 10 words) Description of the sustainable technique (up to 50 words) 1 Carbon sequestration tree planting
The inclusion of roughly 10 drought-tolerant trees and more than 50 other drought tolerant plants and shrubs of varying sizes will result in decreased air pollution through carbon sequestration and filter GHG emissions from the air. These plants will have an added benefit of capturing and filtering stormwater reducing runoff and non-point source water pollution. 2 Facilitation of safe and reliable drinking water
Fully accessible drinking fountains will be installed throughout the park to ensure access to clean and reliable drinking water for park users.
3 LED Lighting
The proposed renovation will include a new park lighting system that will reduce energy use and associated costs. The safety lighting and overall park lighting that will be installed through the renovations will utilize LED lights. These types of bulbs are shown to reduce energy use while providing higher visibility lighting than conventional lighting. 4 Trash Receptacles with Recycling Containers
The project will add new trash containers with separate compartments to encourage recycling. The containers will have compartments to separate plastics, glass, and landfill in order to minimize the amount of waste going to landfill facilities.
5 Forest Stewardship Council Certified Wood
Any wood used for the projects permanent construction will be Forest Stewardship Council certified wood.
6 7
8 9
10 Sunday Monday Tuesday Wednesday Thursday Friday Saturday Response 6a.m. -10p.m. 6a.m. -10p.m. 6a.m. -10p.m. 6a.m. -10p.m. 6a.m. -10p.m. 6a.m. -10p.m. 6a.m. -10p.m.
DocuSign Envelope ID: F9A3A3E5-DC9D-4DAA-95BA-E037A9AA9995 Supervisor
5/19/2022
Jana Clarke
DocuSign Envelope ID: F9A3A3E5-DC9D-4DAA-95BA-E037A9AA9995 DocuSign Envelope ID: F9A3A3E5-DC9D-4DAA-95BA-E037A9AA9995 DocuSign Envelope ID: F9A3A3E5-DC9D-4DAA-95BA-E037A9AA9995 DocuSign Envelope ID: F9A3A3E5-DC9D-4DAA-95BA-E037A9AA9995 DocuSign Envelope ID: F9A3A3E5-DC9D-4DAA-95BA-E037A9AA9995 DocuSign Envelope ID: F9A3A3E5-DC9D-4DAA-95BA-E037A9AA9995 DocuSign Envelope ID: F9A3A3E5-DC9D-4DAA-95BA-E037A9AA9995 DocuSign Envelope ID: F9A3A3E5-DC9D-4DAA-95BA-E037A9AA9995 Supervisor
Supervisor
5/19/2022
5/19/2022
Certificate Of Completion
Envelope Id: F9A3A3E5DC9D4DAA95BAE037A9AA9995 Status: Completed Subject: Please DocuSign: C9803051 Stanton Contract_Signed.pdf Template Code:
Source Envelope:
Document Pages: 9 Signatures: 2 Envelope Originator:
Certificate Pages: 2 Initials: 0 Melinda Steinert
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
1416 9th Street, Room 950
Sacramento, CA 95814
[email protected]
IP Address: 13.88.65.98
Record Tracking
Status: Original
5/18/2022 4:17:28 PM
Holder: Melinda Steinert
[email protected]
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Storage Appliance Status: Connected Pool: California State Department of Parks and Recreation
Location: DocuSign
Signer Events Signature Timestamp
Jana Clarke
[email protected]
Supervisor
California State Department of Parks and Recreation
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Signed by link sent to [email protected]
Using IP Address: 67.161.97.126
Sent: 5/18/2022 4:26:43 PM
Viewed: 5/19/2022 8:38:54 AM
Signed: 5/19/2022 8:39:48 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
lisa vigil
[email protected]
California State Department of Parks and Recreation
Security Level: Email, Account Authentication
(None)
Sent: 5/19/2022 8:39:49 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 5/18/2022 4:26:43 PM
Envelope Summary Events Status Timestamps
Certified Delivered Security Checked 5/19/2022 8:38:54 AM Signing Complete Security Checked 5/19/2022 8:39:48 AM
Completed Security Checked 5/19/2022 8:39:49 AM
Payment Events Status Timestamps
Joint Use Lease Agreement Page 18 of 26
Garden Grove Unified School District
City of Stanton
EXHIBIT C
LEGAL DESCRIPTION AND DEPICTION OF JOINT USE AREA
SHEET 1 OF 1
KDM MERIDIAN, INC. - 1340 REYNOLDS AVE., STE. 110 - IRVINE, CA. 92614 - PH. (949)768-0731
IN THE CITY OF STANTON, COUNTY OF ORANGE, STATE OF CALIFORNIA, BEING A PORTION OF THE EAST ONE-HALF OF THE NORTHEAST QUARTER OF FRACTIONAL SECTION 26, TOWNSHIP 4 SOUTH, RANGE 11 WEST, IN THE RANCHO LOS COYOTES AS PER MAP RECORDED IN BOOK 51, PAGE 11 OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT THE INTERSECTION OF THE SOUTHERLY LINE OF THE ORANGE COUNTY FLOOD CONTROL DISTRICT RIGHT-OF-WAY, KNOWN AS STANTON STORM CHANNEL, AND THE WESTERLY LINE, EXTENDED NORTHERLY, OF PARCEL 1 OF THE PARCEL MAP RECORDED IN BOOK 47, PAGE 35 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDED OF SAID COUNTY;
THENCE ALONG SAID NORTHERLY EXTENSION, THE SAID WESTERLY LINE, AND SAID WESTERLY LINE EXTENDED SOUTHERLY, 6287+
($67)((7727+(&203520,6(/,1(2)7+(5$1&+2/26&2<27(6$1'7+(5$1&+2$/$0,726$6 PER MAP RECORDED IN BOOK 92, PAGES 35 TO 40 INCLUSIVE OF RECORDS OF SURVEYS; 7+(1&($/21*6$,'&203520,6(/,1(1257+
:(67)((772$1(;,67,1*&+$,1/,1.)(1&(
THENCE ALONG SAID CHAINLINK FENCE THE FOLLOWING COURSES; 1257+
($67)((7
1257+
:(67)((7
1257+
:(67)((7
1257+
:(67)((7726$,'6287+(5/</,1(2)7+(25$1*(&2817<)/22'&21752/',675,&7 RIGHT-OF-WAY;
7+(1&($/21*6$,'6287+(5/</,1(1257+
($67)((7727+(POINT OF BEGINNING. THE ABOVE DESCRIBED PARCEL OF LAND CONTAINS 181,537 SQUARE FEET (4.168 ACRES), MORE OR LESS.
ALL AS SHOWN ON EXHIBIT "C-2" ATTACHED HERETO AND MADE A PART THEREOF.
THIS REAL PROPERTY DESCRIPTION HAS BEEN PREPARED BY ME, OR UNDER MY DIRECTION, IN CONFORMANCE WITH THE PROFESSIONAL LAND SURVEYOR'S ACT.
07/18/2023
KEITH M. KLAGGE, P.L.S. 9534 (CA) DATE
THIS DOCUMENT IS PRELIMINARY UNLESS SIGNED
EXHIBIT "C-1"
LEGAL DESCRIPTION
SHEET 1 OF 2 EXHIBIT "C-2"
PLAT TO ACCOMPANY LEGAL DESCRIPTION
07/18/2023
KEITH M. KLAGGE, P.L.S. 9534 (CA) DATE
THIS DOCUMENT IS PRELIMINARY UNLESS SIGNED
KDM MERIDIAN, INC. - 1340 REYNOLDS AVE., STE. 110 - IRVINE, CA. 92614 - PH. (949)768-0731
BEACH BOULEVARD
SHEET 2 OF 2 EXHIBIT "C-2"
PLAT TO ACCOMPANY LEGAL DESCRIPTION
KDM MERIDIAN, INC. - 1340 REYNOLDS AVE., STE. 110 - IRVINE, CA. 92614 - PH. (949)768-0731 23COS02-Closure Report.txt 7/17/2023
22COS02 Closure Report Mon Jul 17 12:51:43 2023
Deed Name: JOINT USE
Starting Coordinates: Northing 5601.38, Easting 4754.49 Bearing Distance Type Radius Arc Len Delta Tangent
S 00°31'25" E 516.51 LINE
N 70°34'48" W 415.35 LINE
N 20°10'00" E 45.82 LINE
N 07°27'10" W 45.78 LINE
N 63°26'57" W 47.06 LINE
N 00°29'38" W 265.11 LINE
N 89°28'35" E 421.54 LINE
Ending Coordinates: Northing 5601.39, Easting 4754.49
Area: 181536.53 S.F., 4.1675 Acres
Total Perimeter Distance> 1757.17
Closure Error Distance> 0.0035 Error Bearing> N 07°51'40" W Closure Precision> 1 in 496131.1
1 Joint Use Lease Agreement Page 19 of 26
Garden Grove Unified School District
City of Stanton
EXHIBIT D
DESCRIPTION AND DEPICTION OF THE PROJECT’S IMPROVEMENTS Project improvements are depicted on the following page and include installation of a new baseball and softball diamond, a multi-purpose field and multi-sport court for basketball, volleyball and pickleball, group picnic area with picnic tables, grills and shade structures, new biking/walking/jogging trail around the perimeter of the park site with a bridge, outdoor exercise equipment, new community building, installation of event plaza with outdoor flex space, installation of new playground, installation of community garden, benches, water fountains, various furniture elements installed throughout the park, and installation of a dog park.
RENEWAL DATE
10-31-23
C-34832
L ICENSED
A
RCH ITECT
STA T E
OF
C
A
L I FORN I A
BRUCE OU
Anaheim
2400 E Katella Ave, Suite 950
Anaheim, CA 92806
949-548-5000 P
FOR BLUEBEAM LABELING/OCR:
0"
1"
PLOT STAMP:
DRAWN BY: C
CLIENT
DATE PROJECT NUMBER
DRAWING HISTORY
BUILDING NUMBER
CLIENT LOGO
ARCHITECT PBK
PBK.com
ARCHITECT
11111 CEDAR ST, STANTON, CA 90680
10/9/2023 1:08:53 PM A1.0 SITE PLAN
NDS
CITY OF STANTON
220368
NORM ROSS SPORTS COMPLEX
STRUCTURAL
RTM ENGINEERING CONSULTANTS
T 949-462-3200
MECHANICAL
LEAF ENGINEERS
T 949-548-5000
PLUMBING
LEAF ENGINEERS
T 949-548-5000
ELECTRICAL
LEAF ENGINEERS
T 949-548-5000
LANDSCAPE
INTEGRATED DESIGN GROUP, LLP.
T 949-906-1628
CIVIL
FPL AND ASSOCIATES, INC.
T 714-906-1628
DISCIPLINE
N
20' 10' 0' 20' 40'
SCALE : 1" = 20'-0"
No. Description Date
N
20' 10' 0' 20' 40'
SCALE : 1" = 20'-0"
N
20' 10' 0' 20' 40'
SCALE : 1" = 20'-0"
N
20' 10' 0' 20' 40'
SCALE : 1" = 20'-0"
CONCEPTUAL
SITE PLAN
10/11/2023
REMOVABLE POSTS
AND NETTING
RENEWAL DATE
10-31-23
C-34832
L ICENSED
A
RCH ITECT
STA T E
OF
C
A
L I FORN I A
BRUCE OU
Anaheim
2400 E Katella Ave, Suite 950
Anaheim, CA 92806
949-548-5000 P
FOR BLUEBEAM LABELING/OCR:
0"
1"
PLOT STAMP:
DRAWN BY: C
CLIENT
DATE PROJECT NUMBER
DRAWING HISTORY
BUILDING NUMBER
CLIENT LOGO
ARCHITECT PBK
PBK.com
ARCHITECT
11111 CEDAR ST, STANTON, CA 90680
10/9/2023 1:08:53 PM A1.0 SITE PLAN
NDS
CITY OF STANTON
220368
NORM ROSS SPORTS COMPLEX
STRUCTURAL
RTM ENGINEERING CONSULTANTS
T 949-462-3200
MECHANICAL
LEAF ENGINEERS
T 949-548-5000
PLUMBING
LEAF ENGINEERS
T 949-548-5000
ELECTRICAL
LEAF ENGINEERS
T 949-548-5000
LANDSCAPE
INTEGRATED DESIGN GROUP, LLP.
T 949-906-1628
CIVIL
FPL AND ASSOCIATES, INC.
T 714-906-1628
DISCIPLINE
No. Description Date
DATE
10/11/2023
CONCEPTUAL
FLOOR PLAN SCALE : 3/16" = 1'-0" 1' 2' 0' 4' 8'
N
2' PROPOSE
SECURITY CAMERA
LOCATION, TYP.
OPERABLE WALL
OPTIONS SHOWN
IN RENDERS. (FOLDING DOOR)
(OVERHEAD SECTIONAL "GARAGE" DOOR)
Joint Use Lease Agreement Page 20 of 26
Garden Grove Unified School District
City of Stanton
EXHIBIT E
STANTON MUNICIPAL CODE CHAPTER 14.04
Stanton, California Municipal Code
Title 14 COMMUNITY SERVICES
Chapter 14.04 PARK AND PLAYGROUND USE
14.04.010 Littering.
14.04.020 Sale of merchandise.
14.04.030 Rides.
14.04.040 Parking and driving.
14.04.050 Riding.
14.04.070 Alcoholic beverages.
14.04.075 Smoking prohibited.
14.04.080 Fireworks, guns, etc.
14.04.090 Fires.
14.04.100 Camping.
14.04.110 Food.
14.04.120 Games.
14.04.130 Gambling.
14.04.140 Park and recreational facilities hours.
14.04.150 Park and recreational facilities entry prohibited.
14.04.160 Reservation system.
14.04.010 Littering.
No person shall dump, deposit, or leave any bottles, broken glass, ashes, paper boxes, cans, dirt, or other waste, garbage, refuse, rubbish, or trash in or upon any public park or playground except in appropriate receptacles provided therefor. (Prior code § 14.04.010)
Joint Use Lease Agreement Page 21 of 26
Garden Grove Unified School District
City of Stanton
14.04.020 Sale of merchandise.
No person shall sell, expose, or offer for sale any goods, wares or merchandise within any public park or playground or upon any public street,sidewalk, or thoroughfare within two hundred feet thereof. (Prior code § 14.04.020)
14.04.030 Rides.
No person shall park,stand,stop, keep, or expose for hire any wagon, carriage, horse, automobile, or other vehicle or animal within any park or playground or upon any public street, sidewalk, or thoroughfare within two hundred feet thereof. (Prior code § 14.04.030)
14.04.040 Parking and driving.
No person shall park or drive a vehicle within a public park, playground or the civic center other than in areas specifically designated for such use. The operation of all vehicles shall be in accordance with posted directions or by following instructions of authorized attendants who may be present. (Amended during 1980 recodification: prior code § 14.04.040)
14.04.050 Riding.
No person shall ride a horse, bicycle, motorcycle, mini-bike, automobile, or other vehicle or animal within a public park or playground; provided, however, that bicycles may be ridden on any road or path designated for such purposes and may be wheeled or pushed by hand over any grass area or trail reserved for pedestrian use. (Prior code § 14.04.050)
14.04.070 Alcoholic beverages.
No person shall consume any alcoholic beverage or have in their possession any open can, bottle or other receptacle containing any alcoholic beverage, within any public park or playground. Any exception to this section, definitions and penalties for a violation, shall be in accordance with the terms of Section
9.04.010. (Ord. 889 § 2, 2004: prior code § 14.04.070)
14.04.075 Smoking prohibited.
A. Purpose. The purpose of thissection isto prohibit the smoking of tobacco products and other substances within the boundaries of any public park, playground, and outdoor recreational area.
B. Definitions.
“Electronic smoking device” means an electronic and/or battery-operated device that can be used to deliver an inhaled dose of nicotine, or any othersubstance, including any component, part, or accessory ofsuch a device, whether or not sold separately. “Electronic smoking device” includes any such device, whether manufactured, distributed, marketed, or sold as an electronic cigarette, an electronic cigar, an electronic cigarillo, an electronic pipe, an electronic hookah, or any other product name or descriptor.
“Park” means any public park orrecreation or playground areas, or building orfacility thereon within the city of Stanton, owned or maintained by the city as a public park or recreation or playground area, whether or not such area(s) have been formally dedicated to such purpose.
“Recreational area” means any area that is publicly or privately owned, controlled, or used by the city and open to the public forrecreational purposes,regardless of any fee or age requirement, including, but not limited to, parks, picnic areas, playgrounds, gardens, athletic fields, trails, bike paths,sportsfacilities, skateboard parks, stadiums, and other open spaces.
“Smoke” means the gases, particles, or vapors released into the air as a result of combustion, electrical ignition, or Joint Use Lease Agreement Page 22 of 26
Garden Grove Unified School District
City of Stanton
vaporization, when the apparent or usual purpose of the combustion, electrical ignition, or vaporization is human inhalation ofthe byproducts, except when the combusting or vaporizing material contains no tobacco, nicotine, marijuana, cannabis, cocaine, or heroin and the purpose of inhalation is solely olfactory, such as, for example, smoke from incense. The term “smoke” includes, but is not limited to, tobacco smoke, electronic smoking device vapors, marijuana or cannabis smoke, crack cocaine or heroin smoke. “Smoking” means the release of gases, particles, or vapors into the air as the result of combustion electrical ignition, or vaporization and/or inhaling, exhaling, burning, or carrying any lighted, heated, or ignited cigar, cigarette, cigarillo, pipe, hookah, electronic smoking device, or any plant product, including, but not limited to, tobacco and marijuana, intended for human inhalation.
“Tobacco product” means:
1. Any product containing, made, or derived from tobacco or nicotine that isintended for human consumption, whether smoked, heated, chewed, absorbed, dissolved, inhaled, snorted, sniffed, or ingested by any other means, including, but not limited to, cigarettes, cigars, little cigars, chewing tobacco, pipe tobacco, snuff; and
2. Any electronic smoking device.
Notwithstanding any provision ofsubsections(1) and (2)to the contrary, “tobacco product” includes any component, part, or accessory of a tobacco product, whether or not sold separately. “Tobacco product” does not include any product that has been approved by the United States Food and Drug Administration for sale as a tobacco cessation product or for other therapeutic purposes where such product is marketed and sold solely for such an approved purpose.
C. Smoking Prohibited. In addition to all places where smoking is prohibited understate orfederal law, smoking shall be prohibited in all parks and recreational areas. No person shall smoke or use any tobacco product in any park or recreational area.
D. Penalties.
1. Any person who violates any provision of thissection shall be guilty of an infraction pursuant to Chapter 1.10 of the Stanton Municipal Code and shall be punished by a fine not to exceed one hundred dollars.
2. The remedies provided by thissection are cumulative and in addition to any otherremedies available to the city at law or in equity. (Ord. 1081 § 2, 2018)
14.04.080 Fireworks, guns, etc.
No person shall bring, possess, or discharge any firearm, slingshot, airgun, bow and arrow, firecrackers,rockets, torpedoes, or otherfireworks, or weapons within any public park or playground. (Prior code § 14.04.080)
14.04.090 Fires.
No person shall make or kindle a fire in any public park or playground except in designated picnic stoves, braziers, or fire pits provided for such purposes. (Prior code § 14.04.090) Joint Use Lease Agreement Page 23 of 26
Garden Grove Unified School District
City of Stanton
14.04.100 Camping.
No person shallsleep, camp, lodge, orstay overnight within any public park or playground; provided, however,that bona fide youth groupssuch asthe Boy Scouts of America, Girl Scouts of America, Boys’ Clubs of America, etc., may camp overnight in such parks or playgrounds upon securing a permit therefor from the city council. (Prior code § 14.04.100)
14.04.110 Food.
No person shall eat, cook,serve, or prepare any food within a public park or playground except within the designated picnic areas provided for such uses. (Prior code § 14.04.110)
14.04.120 Games.
No person shall play at or engage in baseball, volleyball, soccer, football, or other athletic games or events within any public park or playground except within designated areas provided forsuch activities. (Prior code § 14.04.120)
14.04.130 Gambling.
No person shall play or bet at or against any game which is played, conducted, dealt, or carried on with dice, cards, or other devicesfor money, chips,shells, credit, or any otherrepresentative of value, or to maintain or exhibit any gambling table or device within any public park or playground. (Prior code § 14.04.130)
14.04.140 Park and recreational facilities hours.
The hoursthat park and recreational facilities are open for use by the public shall be established by the director of parks and recreation. The director shall cause the hours to be posted at the park or recreational facility and shall cause a list of such hours to be maintained on file in the office of the city clerk. (Ord. 942 § 2, 2007; Ord. 744 § 2, 1993: Ord. 701 § 2, 1990)
14.04.150 Park and recreational facilities entry prohibited.
No person shall enter or remain in any park or recreational facility in the city at any time during the hours when the park or recreational facility is closed to the public pursuant to Section 14.04.140. (Ord. 744 § 2, 1993: Ord. 701 § 2, 1990)
14.04.160 Reservation system.
A. Purpose. The purpose of thissection isto ensure that the public hasfair accessto the city’s park and the facilities therein, and to ensure that the park and its facilities are maintained in good working condition. To achieve these purposes, persons may reserve any area of the park for their exclusive use for limited periods of time, and the use of park facilities will require a reservation and the payment of a fee.
B. Definitions.
“City” meansthe city of Stanton.
“Designated parks” means parksthat have been designated by city councilresolution asrequiring reservations for the use of park facilities therein.
“Director” meansthe director of community services of the city of Stanton, or his/her designee. “Park area” means any designated area in any city park other than park facilities.
Joint Use Lease Agreement Page 24 of 26
Garden Grove Unified School District
City of Stanton
“Park facility” means any structure, installation, equipment or designated recreational area such as a picnic shelter, baseball field, barbeque orsimilar area located within any city park, and which is owned, leased, operated or maintained by the city.
“Park” means any land that is owned, leased, operated or maintained before or afterthe effective date of the ordinance codified in this section by the city of Stanton and that is held as a park or recreation area. “Permittee” meansthe person to whom a permit isissued. Permittee shall include any member of the group, entity, corporation, association, etc. for which the permit was obtained. “Person” means an individual; a person may also be a group, entity, corporation, association, etc. or its agent, employee, or representative.
“Stored personal property” means personal property that isleft in any public area lacking a guard, escort, caretaker, or other watcher.
“Trespass notice” means a written notice issued by city staff or a peace officer to any person found to be occupying park facilities without having obtained a reservation, indicating that the person’s presence at park facilities without a reservation is unlawful, and requiring that the person vacate the park facility immediately.
C. Park Area Reservations. Any person may reserve certain defined areas within the parks for exclusive use atstated dates and times. Upon compliance with the terms of the established reservation system, the directorshall issue a written permitsetting forth the area or facility to be used and the dates and hours during which the permit is valid.
D. Reservation Required for Use of Park Facilities at Designated Parks.
1. All persons using park facilities at designated parksshall, prior to such use, pay such fees and deposits as may be established by resolution of the city council and thereby obtain a reservation for the park facility for a certain date and time period.
2. It is unlawful for any person to occupy, use, or store personal property in park facilities at designated parks without having obtained a reservation. Each person seeking to reserve park facilities at designated parks for such purposes will be required to present a current form of identification upon the payment of fees.
3. No person shall occupy a park facility within a designated park, or use or store personal property in a park facility within a designated park, at any time other than the date and time on that person’s reservation.
E. Reservations Available for Park Facilities at Nondesignated Parks.
1. Any person wishing to reserve a park facility in a nondesignated park prior to such use must pay such fees and deposits as may be established by resolution of the city council and thereby obtain a reservation for the park facility for a certain date and time period.
2. No person other than the permittee shall intrude upon or use the area or facilities designated in the permit, norshall any person interfere with the use ofsuch area or facilities by permitted individuals or groups, during the time stated in the permit.
F. The permittee shall keep the permit on his or her person at all times during the course of the described event(s) and shall upon request display same to a city of Stanton police officer or enforcement personnel.
Joint Use Lease Agreement Page 25 of 26
Garden Grove Unified School District
City of Stanton
G. Signage. The city shall provide signage at park facilitiesin designated parksthatshall only be available pursuant to reservation and payment of a fee.
H. Penalties.
1. Designated Parks.
a. Any person who occupies or uses a park facility, or stores personal property in a park facility, without having first obtained a reservation, may be punished by civil fine in an amount approved by the city council. b. Any person who is found to be occupying a park facility, or storing personal property in a park facility, without having obtained a reservation,shall be issued a trespass notice, and shall be required to vacate the park facility. A refusal to vacate the park facility after being issued a trespass notice is unlawful and shall constitute a misdemeanor.
2. Nondesignated Parks. Any person who isfound to be occupying a park area, orstoring personal property in a park area, during the time and date that a permit has issued to another person, shall be issued a trespass notice, and shall be required to vacate the park area and not return until after the expiration of the permit. A refusal to vacate the park area after being issued a trespass notice is unlawful and shall constitute a misdemeanor.
3. Nothing in thissection shall be construed to affect,supersede or otherwise prevent private causes of action fortrespass or other public civil, penal or administrative prosecution fortrespass or maintaining a nuisance under state or local statute or ordinance. (Ord. 1015 § 2, 2013) Contact:
City Clerk: 714-379-9222
Published by Quality Code Publishing, Seattle, WA. By using thissite, you agree to the terms of use.
Joint Use Lease Agreement Page 26 of 26
Garden Grove Unified School District
City of Stanton
EXHIBIT F
CRIMINAL BACKGROUND INVESTIGATION
FINGERPRINTING AND MEGAN’S LAW CERTIFICATION
CERTIFICATION TO BE COMPLETED BY CITY OF STANTON
THE UNDERSIGNED MUST CHECK EACH BOX AND EXECUTE THIS FORM AND THEREBY CERTIFIES TO THE GOVERNING BOARD OF THE DISTRICT THAT:
☐ Fingerprint / Background Check Certification (Education Code § 45125.1).
Pursuant to Education Code Section 45125.1, the City has obtained for any employee (or subconsultant(s)’s employee) who will interact with pupils, outside of the immediate supervision and control of the pupil’s parent or guardian or a school employee, a valid criminal records summary provided by the Department of Justice (DOJ). The employee must provide sets of fingerprints to the DOJ that the DOJ will use to obtain criminal record summary information from itself and the Federal Bureau of Investigation (FBI). The DOJ shall review the criminal record summary it obtains from its internal search and from the FBI to ascertain whether an applicant for employment has a conviction, or an arrest pending final adjudication, for any sex offense, controlled substance offense, crime of violence, or serious or violent felony. If the criminal record summary for an employee reflects a conviction or arrest for any of these, that employee shall not perform any services for the District.
The City shall immediately provide any subsequent arrest and conviction information it receives to the District pursuant to the subsequent arrest service.
☐ Megan’s Law (Sex Offenders).
I have verified and will continue to verify that the employees of the City that will be on District property and the employees of the City’s subcontractor(s) that will be on District property are not listed on California’s “Megan’s Law” Website (http://www.meganslaw.ca.gov/).
Date:
Proper Name of the City: City of Stanton_________________ Signature:
Print Name:
Title:
[END OF DOCUMENT]
N
20' 10' 0' 20' 40'
SCALE : 1" = 20'-0"
N
20' 10' 0' 20' 40'
SCALE : 1" = 20'-0"
N
20' 10' 0' 20' 40'
SCALE : 1" = 20'-0"
N
20' 10' 0' 20' 40'
SCALE : 1" = 20'-0" REMOVABLE POSTS
AND NETTING
Attachment: C
Click here to return to the agenda.
April 2025 | Initial Study/Mitigated Negative Declaration
NORM ROSS SPORTS PARK
IMPROVEMENT PROJECT
City of Stanton
Contact: Cesar Rangel, Public Works Director/City Engineer 7800 Katella Avenue
Stanton, California 91739
714.890.4203
Attachment: D
Click here to return to the agenda.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
Table of Contents
April 2025 Page i
Section Page
1. INTRODUCTION.............................................................................................................1
1.1 CALIFORNIA ENVIRONMENTAL QUALITY ACT .............................................................. 1
1.2 PROJECT LOCATION...................................................................................................................... 3
1.3 ENVIRONMENTAL SETTING..................................................................................................... 3
1.4 PROJECT DESCRIPTION............................................................................................................. 11
1.5 CITY ACTION REQUESTED ...................................................................................................... 13
2. ENVIRONMENTAL CHECKLIST ..................................................................................21
2.1 PROJECT INFORMATION........................................................................................................... 21
2.2 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED.......................................... 24
2.3 DETERMINATION (TO BE COMPLETED BY THE LEAD AGENCY)........................ 24
2.4 EVALUATION OF ENVIRONMENTAL IMPACTS............................................................... 25
3. ENVIRONMENTAL ANALYSIS .....................................................................................27
3.1 AESTHETICS .................................................................................................................................... 27
3.2 AGRICULTURE AND FORESTRY RESOURCES.................................................................. 37
3.3 AIR QUALITY................................................................................................................................... 39
3.4 BIOLOGICAL RESOURCES......................................................................................................... 46
3.5 CULTURAL RESOURCES ............................................................................................................. 50
3.6 ENERGY............................................................................................................................................. 52
3.7 GEOLOGY AND SOILS................................................................................................................ 58
3.8 GREENHOUSE GAS EMISSIONS ............................................................................................. 63
3.9 HAZARDS AND HAZARDOUS MATERIALS ....................................................................... 67
3.10 HYDROLOGY AND WATER QUALITY.................................................................................. 72
3.11 LAND USE AND PLANNING..................................................................................................... 78
3.12 MINERAL RESOURCES................................................................................................................ 79
3.13 NOISE.................................................................................................................................................. 80
3.14 POPULATION AND HOUSING................................................................................................. 92
3.15 PUBLIC SERVICES.......................................................................................................................... 93
3.16 RECREATION .................................................................................................................................. 96
3.17 TRANSPORTATION....................................................................................................................... 97
3.18 TRIBAL CULTURAL RESOURCES........................................................................................... 104
3.19 UTILITIES AND SERVICE SYSTEMS..................................................................................... 108
3.20 WILDFIRE........................................................................................................................................ 110
3.21 MANDATORY FINDINGS OF SIGNIFICANCE................................................................. 112
4. REFERENCES............................................................................................................114
5. LIST OF PREPARERS................................................................................................119 LEAD AGENCY............................................................................................................................................ 119
APPENDICES
Appendix A Air Quality, Greenhouse Gas, and Energy
Appendix B Cultural Resource – Records Search
Appendix C Geotechnical Report
Appendix D Paleontological Resources Records Search
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
Table of Contents
Page ii
Appendix E Noise Assessment
Appendix F Traffic/Transportation Analysis
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
Table of Contents
April 2025 Page iii
List of Figures
Figure Page
Figure 1 Regional Location................................................................................................................................. 5 Figure 2 Local Vicinity......................................................................................................................................... 7 Figure 3 Aerial Photograph................................................................................................................................. 9 Figure 4 Proposed Site Plan..............................................................................................................................15 Figure 5 Community Building and Garden Storage Building......................................................................17 Figure 6 Building Elevations.............................................................................................................................19 Figure 7 Field Lighting Property Line Light Spill..........................................................................................35 Figure 8 Approximate Noise Monitoring Locations ....................................................................................84 List of Tables
Table Page
Table 1 General Light Levels Benchmark.....................................................................................................30 Table 2 Maximum Daily Regional Construction Emissions......................................................................41 Table 3 Maximum Daily Regional Operation Emissions...........................................................................42 Table 4 Localized Construction Emissions...................................................................................................43 Table 5 Localized Construction Emissions with Mitigation Incorporated..............................................44 Table 6 Electricity Consumption....................................................................................................................55 Table 7 Operation-Related Natural Gas Consumption ..............................................................................56 Table 8 Project-Related Operation GHG Emissions..................................................................................65 Table 9 Hazardous Waste Sites within 0.25 Mile.........................................................................................70 Table 10 Existing Traffic Noise Levels............................................................................................................81 Table 11 Short-Term Noise Measurements Summary in A-weighted Sound Levels...............................82 Table 12 Groundborne Vibration Criteria ......................................................................................................83 Table 13 Project-Related Construction Noise, dBA Leq..............................................................................87 Table 14 Project Net Traffic Noise Increases ................................................................................................89 Table 15 Vibration Damage Levels for Typical Construction Equipment................................................91 Table 16 Intersections near the Project Site....................................................................................................99 Table 17 Project-Generated Traffic................................................................................................................100 Table 18 Project Impacts on Daily Traffic Volumes...................................................................................101
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
Abbreviations and Acronyms
April 2025 Page i
ACRONYMS AND ABBREVIATIONS
AAQS ambient air quality standards
AB Assembly Bill
ACM asbestos-containing materials
ADT average daily traffic
amsl above mean sea level
AQMP air quality management plan
AST aboveground storage tank
BAU business as usual
bgs below ground surface
BMP best management practices
CAA Clean Air Act
CAFE corporate average fuel economy
CalARP California Accidental Release Prevention Program CalEEMod California Emissions Estimator Model
CalEMA California Emergency Management Agency
Cal/EPA California Environmental Protection Agency
CAL FIRE California Department of Forestry and Fire Protection CALGreen California Green Building Standards Code
CalRecycle California Department of Resources, Recycling, and Recovery Caltrans California Department of Transportation
CARB California Air Resources Board
CBC California Building Code
CCAA California Clean Air Act
CCR California Code of Regulations
CDE California Department of Education
CDFW California Department of Fish and Wildlife
CEQA California Environmental Quality Act
CERCLA Comprehensive Environmental Response, Compensation and Liability Act cfs cubic feet per second
CGS California Geologic Survey
CGP Construction General Permit
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
Abbreviations and Acronyms
Page ii
CMP congestion management program
CNDDB California Natural Diversity Database
CNEL community noise equivalent level
CO carbon monoxide
CO2e carbon dioxide equivalent
Corps US Army Corps of Engineers
CSO combined sewer overflows
CUPA Certified Unified Program Agency
CWA Clean Water Act
dB decibel
dBA A-weighted decibel
DAMP Drainage Area Management Plan
DPM diesel particulate matter
DSA Division of the State Architect
DTSC Department of Toxic Substances Control
EIR environmental impact report
EPA United States Environmental Protection Agency
EPCRA Emergency Planning and Community Right-to-Know Act FEMA Federal Emergency Management Agency
FHWA Federal Highway Administration
FTA Federal Transit Administration
Fc Foot-Candle
GHG greenhouse gases
GSWC Golden State Water Company
GWP global warming potential
HCM Highway Capacity Manual
HQTA high quality transit area
HVAC heating, ventilating, and air conditioning system
IPCC Intergovernmental Panel on Climate Change
kWh kilowatt hours
Ldn day-night noise level
Leq equivalent continuous noise level
LBP lead-based paint
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
Abbreviations and Acronyms
April 2025 Page iii
LCFS low-carbon fuel standard
LOS level of service
LST localized significance thresholds
MW moment magnitude
MBTA Migratory Bird Treaty Act
MCL maximum contaminant level
MEP maximum extent practicable
mgd million gallons per day
MMT million metric tons
MPO metropolitan planning organization
MT metric ton
MWD Metropolitan Water District of Southern California
NAHC Native American Heritage Commission
NOX nitrogen oxides
NPDES National Pollution Discharge Elimination System
O3 ozone
OCFA Orange County Fire Authority
OC SAN Orange County Sanitation District
OCSD Orange County Sheriff’s Department
OCTA Orange County Transportation Authority
OES California Office of Emergency Services
PM particulate matter
POTW publicly owned treatment works
ppm parts per million
PPV peak particle velocity
RCNM Roadway Construction Noise Model
RCRA Resource Conservation and Recovery Act
REC recognized environmental condition
RMP risk management plan
RMS root mean square
RPS renewable portfolio standard
SB Senate Bill
SCAG Southern California Association of Governments
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
Abbreviations and Acronyms
Page iv
South Coast AQMD South Coast Air Quality Management District SCCIP South-Central Coastal Information Center
SCE Southern California Edison
SIP state implementation plan
SLM sound level meter
SoCAB South Coast Air Basin
SOX sulfur oxides
SQMP stormwater quality management plan
SRA source receptor area
SUSMP standard urban stormwater mitigation plan
SWP State Water Project
SWPPP Storm Water Pollution Prevention Plan
SWRCB State Water Resources Control Board
TAC toxic air contaminants
TNM transportation noise model
tpd tons per day
TRI toxic release inventory
TTCP traditional tribal cultural places
USFWS United States Fish and Wildlife Service
USGS United States Geological Survey
UST underground storage tank
UWMP urban water management plan
V/C volume-to-capacity ratio
VdB velocity decibels
VHFHSZ very high fire hazard severity zone
VMT vehicle miles traveled
VOC volatile organic compound
WQMP water quality management plan
WSA water supply assessment
April 2025 Page 1
1. Introduction
The City of Stanton (City) is proposing to redevelop the underutilized Norm Ross Sports Park at 11111 Cedar Street in the rear of Carver Early Education Center in the City of Stanton (APN 131-091-30). The proposed project would develop a little league baseball field, lighting poles, a U-12 soccer field, a multipurpose sports court, a playground, a courtyard amphitheater, shaded picnic areas, fitness equipment, a community garden, a storage building, a park building with restrooms, a new water basin, a new pedestrian bridge, a new perimeter wall on east and southside, new perimeter fencing on the west and northside, utility/emergency entrance, utility access area, and a small and large dog park; the proposed project would also upgrade an existing pedestrian bridge. In addition, the City would reorient the existing little league baseball field so that home plate is on the southwest corner of the field near the existing parking lot and add a U-12 soccer field over the same area. Field improvements also include new sports lighting, two shaded bleachers, two shaded dug outs, a field storage structure, a trash enclosure and two free standing drinking fountains. Norm Ross Sports Park is a joint-use park with the Garden Grove Unified School District (GGUSD). The City of Stanton is lead agency for the proposed redevelopment project and the project will be funded through a Proposition 68 Grant.
The proposed project is required to undergo an environmental review pursuant to the California Environmental Quality Act (CEQA). This initial study provides an evaluation of the potential environmental consequences associated with this proposed project.
1.1 CALIFORNIA ENVIRONMENTAL QUALITY ACT
The completion of the environmental compliance process is governed by two principal regulations: CEQA and the State CEQA Guidelines (California Code of Regulations, Title 14, Section 15000 et seq.). CEQA was enacted in 1970 by the California Legislature to disclose to decision makers and the public the significant environmental effects of proposed activities and to identify ways to avoid or reduce the environmental effects through feasible alternatives or mitigation measures. Compliance with CEQA applies to California government agencies at all levels: local, regional, and state agencies, boards, commissions, and special districts (such as school districts and water districts).
The City of Stanton is lead agency for the proposed project and is therefore required to analyze the potential environmental effects associated with the project.
Public Resources Code Section 21080(a) states that analysis of a project’s environmental impact is required for any “discretionary projects proposed to be carried out or approved by public agencies….” In this case, the city has determined that an initial study is required to determine whether there is substantial evidence that implementation of the project would result in environmental impacts. An initial study is a preliminary environmental analysis to determine whether an environmental impact report (EIR), a mitigated negative declaration (MND), or a negative declaration (ND) is required for a project (CEQA Guidelines Section 15063).
An initial study must have a project description; a description of the environmental setting; an identification of
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
environmental effects by checklist or other similar form; an explanation of environmental effects; a discussion of mitigation for significant environmental effects; an evaluation of the project’s consistency with existing, applicable land use controls; the names of persons who prepared the study; and identification of data sources (CEQA Guidelines Section 15063(d)).
When an initial study identifies substantial evidence of the potential for significant environmental impacts, the lead agency must prepare an EIR (CEQA Guidelines Section 15064); however, if all impacts can be mitigated to a less than significant level, the lead agency can prepare an MND that incorporates mitigation measures into the project (CEQA Guidelines Section 15070).
1.1.1 Environmental Process
A “project” means the whole of an action that has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and that is any of the following:
▪ An activity directly undertaken by any public agency, including but not limited to public works construction and related activities clearing or grading of land, improvements to existing public structures, enactment and amendment of zoning ordinances, and the adoption and amendment of local General Plans or elements thereof pursuant to Government Code Sections 65100 to 65700. ▪ An activity undertaken by a person which is supported in whole or in part through public agency contacts, grants, subsidies, loans, or other forms of assistance from one or more public agencies. ▪ An activity involving the issuance to a person of a lease, permit, license, certificate, or other entitlement for use by one or more public agencies (CCR § 15378[a]).
The proposed actions by the City constitute a “project” because the activity would result in a direct physical change in the environment and would be undertaken by a public agency. All “projects” in the State of California are required to undergo an environmental review to determine the environmental impacts associated with implementation of the project.
1.1.2 Initial Study
This initial study was prepared in accordance with CEQA and the CEQA Guidelines, as amended, to determine if the project could have a significant impact on the environment. The purposes of this initial study, as described in the State CEQA Guidelines Section 15063, are to 1) provide the lead agency with information to use as the basis for deciding whether to prepare an EIR or ND; 2) enable the lead agency to modify a project, mitigating adverse impacts before an EIR is prepared, thereby enabling the project to qualify for an ND; 3) assist the preparation of an EIR, if one is required; 4) facilitate environmental assessment early in the design of a project; 5) provide documentation of the factual basis for the finding in an ND that a project will not have a significant effect on the environment; 6) eliminate unnecessary EIRs; and 7) determine whether a previously prepared EIR could be used with the project. The findings in this initial study have determined that an MND is the appropriate level of environmental documentation for this project.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
April 2025 Page 3
1.2 PROJECT LOCATION
The approximately 4.2-acre Norm Ross Sports Park is at 11111 Cedar Street in the City of Stanton, Orange County (project site). The project site is at the rear of Carver Early Education Center located at 11150 Santa Rosalia Street (APN 131-091-30), owned by GGUSD.
The City of Stanton is surrounded by the cities of Cypress, Buena Park, Anaheim, Garden Grove, Westminster, with regional access provided by Interstate 405 (I-405), State Route 22 (SR-22), and SR-39. Figure 1, Regional Location, shows the project site in regional context, and Figure 2, Local Vicinity, in local context.
1.3 ENVIRONMENTAL SETTING
1.3.1 Existing Land Use
The project site is currently developed as the approximately 4.2-acre Norm Ross Sports Park. The majority of the project site is improved as baseball and softball fields with bleachers behind the home plate of both fields.
The home plate for the baseball field and softball field are located on the northeast side and southeast side of the project site, respectively. Stadium lights surround the fields. The project site has a total of 7 existing lighting poles with sport lighting fixtures that surround the baseball/softball field. and there is an additional sports lighting pole and fixture on the Carver campus in the parking lot towards the southwest corner of the project site (offsite). An approximately 492-square-foot triangular area on the northwest corner of the project site is developed as a community garden, maintained and operated by the City of Stanton. The project site is not currently in use due to poor site conditions, with the exception of the community garden.
A total of 16 trees line the perimeter of the project site with a variety of tree species, including four chinaberry trees (Melia Azedarach), three melaleuca species, one Tulip Tree (Liriodendron Tulipifera), two pinus species, four Holly oaks (Quercus Ilex), one orchard tree (Baudinia), and one dead tree. Pedestrian access to the project site is accessed via one pedestrian bridge on the northeast side of the project site that crosses over the Stanton Storm Channel from the adjacent Stanton Park to the north. Another pedestrian bridge connects Stanton Park to Carver Early Education Center and can also provide access to the project site. A controlled vehicle access on the southeast corner of the project site for authorized/emergency vehicles from Ruthann Avenue. General vehicle access to the project site is not permitted. Drivers can park in the parking lot in Stanton Park or in the Parking Structure, to the north of the project site, and use the pedestrian access points to enter the project site.
Access to the community garden is restricted from the Carver Early Education Center and provided only from Cedar Street/the Stanton Park parking lot. The community garden is accessible 7 days a week to residents who lease plots via the Stanton Community Foundation.
The Norm Ross Sports Park is on property owned by GGUSD and currently operates under the joint-use agreement between the City of Stanton and GGUSD. GGUSD has non-exclusive access and use of the park on weekdays between the hours of 7:00 am until 4:00 pm, and the park is open to the general public from 4:00 pm to 10:30 pm., subject to the approved joint use agreement. During the weekends, the park is open to the general public from 8:00 am to 8:00 pm.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
1.3.2 Surrounding Land Use
The project site is surrounded by residential uses to the south; Stanton Park to the north; the Carver Early Education Center to the west; and commercial/retail, including night club, motel, and restaurant uses, to the east (See Figure 3, Aerial Photograph). Stanton Park is bordered by residential uses, a parking structure for the Stanton City Hall, Food 4 Less, and McDonald’s to the north. Other major uses in the area include a block and hardscape manufacturing company across Bleach Boulevard to the northeast.
The properties surrounding the project site have zoning designations of Single-Family Residential (RL) to the south, Parks and Recreation (PR) to the north, Public Institutional (PI) to the west, and Commercial General Zone (CG) to the east (Station 2008). The surrounding General Plan Land Use designation includes low density residential to the south, open space to north, public/institutional to the west, and general mixed use to the east.
1.3.3 Existing Zoning and General Plan
The City of Stanton General Plan designates the project as Public/Institutional and the zoning designation is “PI” Public Institutional.
Figure 1 - Regional Location
NORM ROSS SPORTS PARK IMPROVEMENT PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
CITY OF STANTON
Source: Generated using ArcMap 2023.
1. Introduction
0 Scale (Miles)
3 Note: Unincorporated county areas are shown in white.
Project Site
County Boundary
Santa Ana River
County of Los Angeles
County of Orange
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
This page intentionally left blank.
Figure 2 - Local Vicinity
Source: Generated using ArcMap 2023.
1. Introduction
0 Scale (Feet)
2,000
Project Boundary
Stanton Storm Channel
Anaheim Flood Control Channel
Carbon Creek Channel
Katella Ave
W Cerritos Ave
Beach Blvd
Chapman Ave
Rall Rd
Orangewood Ave
Western Ave
Knott Ave
Magnolia St
Dale Ave
Lampson Ave
NORM ROSS SPORTS PARK IMPROVEMENT PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
CITY OF STANTON
Note: Unincorporated county areas are shown in white.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
This page intentionally left blank.
Figure 3 - Aerial Photograph
Source: NearMap 2023.
1. Introduction
0 Scale (Feet)
170
Beach Blvd
Ruthann Ave
Joel Ave
Stanton Ave
Ale Ln
Residential
Commercial
Residential
Commercial
Carver Preschool
Stanton Storm Channel
Stanton Park
39 CALIFORNIA
Project Boundary
NORM ROSS SPORTS PARK IMPROVEMENT PROJECT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
CITY OF STANTON
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
This page intentionally left blank.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
April 2025 Page 11
1.4 PROJECT DESCRIPTION
1.4.1 Proposed Land Use
The City of Stanton (City) is proposing to redevelop the underutilized Norm Ross Sports Park at 11111 Cedar Street in the rear of Carver Early Education Center in the City of Stanton (APN 131-091-30). The proposed project would be financed through a Proposition 68 Grant.
The proposed project would demolish existing uses and redevelop the project site with new sports and park facilities. The proposed project would develop a little league baseball field, lighting poles, a U-12 soccer field, a multipurpose sports court, a playground, a courtyard amphitheater, shaded picnic areas, fitness equipment, a community garden, a storage building, a park building with restrooms, a new water basin, a new pedestrian bridge, a new perimeter wall on east and southside, new perimeter fencing on the west and northside, utility/emergency entrance, utility access area, and a small and large dog park; the proposed project would also upgrade an existing pedestrian bridge.
The new little league baseball field would place the home plate on the southwest corner of the project site and have the outfield towards the northeast of the project site. Field improvements also include new sport field lighting (two light poles to the south, west, and east of the baseball/soccer field) and visitor and home team dugouts, two free standing drinking fountains, and shade structures over the two sets of bleachers near the home plate on the southwest side of the baseball field. Additionally, the outfield area of the new little league baseball field would also be utilized as a U-12 soccer field. The multipurpose sports court (approximately 4,281 square feet) and shaded picnic tables would be located to the north of the baseball field.
The park building would be located at the northwest end of the project site, near the proposed pedestrian bridge, and would be approximately 2,533 square feet. The proposed building would include a community room, an office, a break/storage room, an electrical room, a data room, two outdoor and one indoor restroom, a custodian room, an equipment storage room, and an event storage room. The park building would be connected to the 1,055-square feet storage room by an overhanging shade roof. The playground (approximately 3,372 square feet), courtyard with outdoor seating and picnic tables would be located to the south of the park building, west of the baseball field. See Figure 5, Community Building and Garden Storage Building Floor Plan, and Figure 6, Building Elevations.
The community garden would be reoriented from its triangular area in the northwest corner, to a rectangular orientation along Carver Early Education Center, along the west side of the project site. Improvements to the community garden would include new planter boxes, an additional garden storage shed, decomposed granite, pedestrian scale lights, and a pedestrian walkway connected to the Carver Early Childhood Education Center.
A dog park (approximately 7,589 square feet) with separate areas for large and small dogs would be located on the northeast corner of the project site. The dog park would be fenced and include benches, trashcans, turf and decomposed granite.
The project site would include a new pedestrian bridge (approximately 411 square feet) near the northwest corner of the project site and walking paths and small vehicle paths throughout. The proposed project would
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
include a total of approximately 111,519 square feet of landscaping and approximately 70,301 square feet of hardscaping. The footings for the pedestrian bridge would not alter the existing channel.
1.4.1.1 LIGHTING
The proposed project would include lighting throughout the project site to support the uses onsite and for safety and security. The proposed project would include 50-foot tall light poles with light fixtures in the dog park; 50-foot tall light poles with light fixtures to illuminate the multipurpose court; and 60- to 70-foot tall light poles with stadium light fixtures to illuminate the baseball and soccer field. The proposed project would include up to pedestrian scale lights in the community garden, courtyard, playground, dog park, around the basketball court, and along walkways.
1.4.1.2 USE AND SCHEDULE
The park’s operating hours and use schedule would comply with the adopted joint use agreement with the GGUSD. It is anticipated that the park would be open to the general public daily from dusk to dawn with seasonal adjustment. The multi-use field would operate on a first come, first serve basis, and other park amenities would also be used freely by the park visitors. The baseball field would be reserved for use by different little league teams throughout the week on a set schedule, revised twice a year. The future use schedule is anticipated to include practices, two games per day on weekdays, and 5 games per day on Saturdays. The two games during the weekdays are expected to occur from 4 pm to 6 pm and from 6 pm-8 pm. During the summer hours of play are anticipated to be extended, with an additional two teams playing or practicing. A baseball team consists of approximately 15 players.
Use of the community garden is not anticipated to change and would continue to be accessible 7 days a week to residents.
1.4.1.3 PEDESTRIAN AND VEHICLE ACCESS
Pedestrian access to the project site would continue to be provided by the two existing pedestrian bridges – the northeast pedestrian bridge directly connects to the project site and the pedestrian bridge to the northwest is offsite and provides direct access to Carver Early Education Center. As part of the proposed project, a new pedestrian bridge would be constructed on the northwest corner of the project site. This new pedestrian bridge would provide a second pedestrian access point from Stanton Park directly to the project site.
Vehicle access and parking will continue to be provided on Stanton Park. The emergency/authorized vehicle access on the southeast corner of the project site from Ruthann Avenue would be improved with paving and would remain.
1.4.1.4 STORMWATER MANAGEMENT
Aside from a concrete path along the southern side of the project site and concrete areas associated with the existing baseball diamond, the project site contains pervious surfaces. The existing project site is approximately 99 percent pervious surfaces. The proposed project would construct new building, walkways, and hardscaped areas. With the proposed project, the project site would be approximately 32 percent impervious surfaces and
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
April 2025 Page 13
68 percent pervious surfaces. The proposed project includes the installation of an infiltration basin or a bioretention basin without underdrain on the southwest side of the project site in the lawn area between the community garden and playground. The infiltration basin or a bioretention basin without underdrain would be approximately 156 feet long, between three to 30 feet wide (average width 18 feet), and five to nine feet deep.
A storm drain line would extend north from the infiltration basin or a bioretention basin without underdrain to the north side of the project site, where it would turn west at the channel and run parallel to the channel.
In pervious areas, stormwater on the project site would either percolate into the into pervious ground surfaces or leave the site as runoff. In impervious areas, stormwater would either be directed to storm drain inlets, directed to pervious surfaces, or leave the project site as runoff. The majority of the stormwater generated by the proposed project would percolate into the ground or be directed to the infiltration basin or a bioretention basin without underdrain. A portion of stormwater is expected to flow or discharge into the offsite channel.
1.4.2 Construction
Construction activities would include demolition and site preparation, grading, utility trenching, building construction, paving, architectural coating and finishing/landscaping. All 16 trees would be removed.
Construction of the proposed project would occur over one phase. The proposed project would include a total of 14,437 cubic yards of soil export from the project site. The construction is anticipated to start Fall 2025 and end in Spring 2027.
1.5 CITY ACTION REQUESTED
Implementation of the proposed project would require the following discretionary and ministerial project approvals from the City of Stanton:
▪ Adopt the Mitigated Negative Declaration
▪ Approve the bid Specification and Plans
▪ Award a Construction Contract
The following agencies are responsible or trustee agencies under CEQA and would review and/or approve certain components of the proposed project:
▪ Orange County Fire Authority: Fire Master Plan Review ▪ California Department of Transportation (CalTrans): Plan review if waterline is required to encroach onto Beach Boulevard
▪ Division of State Architects: Plan review
▪ Orange County Public Works: New Bridge/Plan Review
▪ Golden State Water Company: Waterline Design Review
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
This page intentionally left blank.
T
T
TT
REF.
PLAYGROUN
D
BLEACHERS
MULTI-PURPOS
E
COURT
four-post hip
four-post hip joined or double-wide
four-post hip joined quad
model number
model number
model number
max size
max size
max entry height
max entry height
DSA4012030-16
DSA401303012-16
DSA4012030-16
DSA401304012-16
DSA4012040-16
DSA4014040-16
DSA401203012-16
DSA401S2030-16 (#20 snow load)
20’ x 30’
30’ x 30’
30’ x 30’
30’ x 40’
30’ x 40’
40’ x 40’
20’ x 30’
20’ x 30’
15’
12’
15’
12’
15’
15’
12’
15’
DSA PC Models
max size max entry height
DSA401Q202512-16 20’ x 25’ per unit 12’
DSA401Q203012-16 20’ x 30’ per unit 12’
DSA401Q303012-16 30’ x 30’ per unit 12’
DSA401Q304012-16 30’ x 40’ per unit 12’
DSA401Q2025-16 20’ x 25’ per unit 15’
DSA401Q2030-16 20’ x 30’ per unit 15’
DSA401Q3030-16 30’ x 30’ per unit 15’
DSA401Q3040-16 30’ x 40’ per unit 15’
DSA401J202512-16 20’ x 25’ per unit 12’
DSA401J203012-16 20’ x 30’ per unit 12’
DSA401J303012-16 30’ x 30’ per unit 12’
DSA401J304012-16 30’ x 40’ per unit 12’
DSA401J2025-16 20’ x 25’ per unit 15’
DSA401J2030-16 20’ x 30’ per unit 15’
DSA401J3030-16 30’ x 30’ per unit 15’
DSA401J3040-16 30’ x 40’ per unit 15’
12 | 1.800.966.5005 | USA-SHADE.COM USA-SHADE.COM | 1.800.966.5005 | 13 hexagon 3-point sail and 3-point sail joined
4-point sail and 4-point sail joined
triangle
model number model number
model number
model number
max size max size
max size
max size
max entry height max ent
ry height
max entry height
max entry height
DSA60340-16 DSA30730-16
DSA4182020-16
DSA30125-16
DSA60360-16
DSA4183030-16
DSA30140-16
30’ x 30’ x 30’ per unit
Can be joined to a maximum length of 300’
Can be joined to a maximum length of 200’
Can be joined to a maximum length of 200’
20’ x 20’ per unit
25’ x 25’ x 25’
up to 40’ diameter
30’ x 30’ per unit
40’ x 40’ x 40’
up to 60’ diameter
15’ 19’
19’
15’
15’
19’
15’
DSA PC Models
PICNIC AREA
SHADE
STRUCTURE
ADA
PICNIC TABLE
BERLINER
QUADRIFOL.01
PLAYSTRUCTURE
BASKETBALL
RING
VOLLEYBALL
BADMINTOM
MODEL
12C44-05-HD600
REMOVABLE GOAL
RIM BRACKET
REMOVABLE POSTS
MODEL EP 1650
BENCH
WITH
BACKREST
SEATING AREA
BASEBALL FIE
L
D
BACKSTOP
DUGOUT
MODEL
BS-45
MODEL
AGS-A21
PLANK PLAYER/
LOCKER ROOM BENCH
MODEL
LBA-BP
SHADE
STRUCTURE
SOCCER
FIE
L
D
SOCCER
GOAL NET
6 | 1.800.966.5005 | USA-SHADE.COM USA-SHADE.COM | 1.800.966.5005 | 7 four-post hip
four-post hip joined or double-wide
four-post hip joined quad
model number
model number
model number
max size
max size
max entry height
max entry height
DSA4012030-16
DSA401303012-16
DSA4012030-16
DSA401304012-16
DSA4012040-16
DSA4014040-16
DSA401203012-16
DSA401S2030-16 (#20 snow load)
20’ x 30’
30’ x 30’
30’ x 30’
30’ x 40’
30’ x 40’
40’ x 40’
20’ x 30’
20’ x 30’
15’
12’
15’
12’
15’
15’
12’
15’
DSA PC Models
max size max entry height
DSA401Q202512-16 20’ x 25’ per unit 12’
DSA401Q203012-16 20’ x 30’ per unit 12’
DSA401Q303012-16 30’ x 30’ per unit 12’
DSA401Q304012-16 30’ x 40’ per unit 12’
DSA401Q2025-16 20’ x 25’ per unit 15’
DSA401Q2030-16 20’ x 30’ per unit 15’
DSA401Q3030-16 30’ x 30’ per unit 15’
DSA401Q3040-16 30’ x 40’ per unit 15’
DSA401J202512-16 20’ x 25’ per unit 12’
DSA401J203012-16 20’ x 30’ per unit 12’
DSA401J303012-16 30’ x 30’ per unit 12’
DSA401J304012-16 30’ x 40’ per unit 12’
DSA401J2025-16 20’ x 25’ per unit 15’
DSA401J2030-16 20’ x 30’ per unit 15’
DSA401J3030-16 30’ x 30’ per unit 15’
DSA401J3040-16 30’ x 40’ per unit 15’
SHADE
STRUCTURE
COMMUNITY
GARDEN
DOG PARK
PICNIC
AREA PICNIC
AREA
PLAYGROUND
BLEACHER
BLEACHER
DUGOUT
DUGOUT
FIELD STORAGE
TRASH
ENCLOSURE
U 12 - SOCCER FIELD
LITTLE LEAGUE
BASEBALL FIELD
PARK BUILDING
COURTYARD
MULTI-PURPOSE
SPORTS COURT
AMPHITHEATER
UTILITY
ACCESS
AREA
STORAGE
BUILDING
TRASH
ENCLOSURE
NEW SHED
NEW SITE
FENCING
FABRIC SHADE
OVER DUGOUT
NEW CMU WALL
UTILITY/EMERGENCY
ENTRANCE
FABRIC SAIL SHADE
STRUCTURE OVER
PICNIC TABLES
NEW
WATER
BASIN
EXISTING PEDESTRIAN
BRIDGE
NEW PEDESTRIAN
BRIDGE
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
This page intentionally left blank.
0 Scale (Feet)
20 NORM ROSS SPORTS PARK IMPROVEMENT PROJECT INITIAL STUDY
CITY OF STANTON
Figure 5 - Community Building and Garden Storage Building Floor Plan
1. Introduction
Source: PBK 2024.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
This page intentionally left blank.
West Elevation - Entry
West Elevation
South Elevation
North Elevation
East Elevation
0 Scale (Feet)
40 NORM ROSS SPORTS PARK IMPROVEMENT PROJECT INITIAL STUDY
CITY OF STANTON
Figure 6 - Building Elevations
1. Introduction
Source: PBK 2024.
Norm Ross Sports Complex
City of Stanton
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
1. Introduction
This page intentionally left blank.
April 2025 Page 21
2. Environmental Checklist
2.1 PROJECT INFORMATION
1. Project Title: Norm Ross Sports Park Improvement Project
2. Lead Agency:
City of Stanton
7800 Katella Avenue
Stanton, California 90680
3. Contact Person and Phone Number:
Cesar Rangel, Public Works Director/City Engineer
714.890.4203
4. Project Location: 11111 Cedar Street , Stanton, Orange County
5. Project Sponsor’s Name and Address:
City of Stanton
7800 Katella Avenue
Stanton, California 90680
6. General Plan Designation: OS Public/Institutional
7. Zoning: “PI” Public Institutional.
8. Description of Project:
The City of Stanton (City) is proposing to redevelop the underutilized Norm Ross Sports Park at 11111 Cedar Street in the rear of Carver Early Education Center in the City of Stanton (APN 131-091-30). The proposed project would develop a little league baseball field, lighting poles, a U-12 soccer field, a multipurpose sports court, a playground, a courtyard amphitheater, shaded picnic areas, fitness equipment, a community garden, a storage building, a park building with restrooms, a new water basin, a new pedestrian bridge, a new perimeter wall on east and southside, new perimeter fencing on the west and northside, utility/emergency entrance, utility access area, and a small and large dog park; the proposed project would also upgrade an existing pedestrian bridge.
9. Surrounding Land Uses and Setting:
The project site is surrounded by residential uses to the south; Stanton Park to the north; Carver Early Education Center to the west; and commercial/retail, night club, motel, and restaurant uses to the east.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
10. Other Public Agencies Whose Approval Is Required (e.g., permits, financing approval, or participating agreement):
▪ Orange County Fire Authority: Fire Master Plan Review ▪ California Department of Transportation (CalTrans): Plan review if waterline is required to encroach onto Beach Boulevard
▪ Division of State Architects: Plan review
▪ Orange County Public Works: New Bridge/Plan Review
▪ Golden State Water Company – Waterline Design Review
11. Have California Native American Tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resources Code section 21080.3.1? If so, is there a plan for consultation that includes, for example, the determination of significance of impacts to tribal cultural resources, procedures regarding confidentiality, etc.? The City of Stanton has engaged in tribal consultation pursuant to Assembly Bill 52. The City sent AB 52 notification letters on October 29, 2024; to the following tribes:
▪ Gabrielino-Tongva Tribe
▪ Juaneño Band of Mission Indians Acjachemen Nation
▪ Gabrielino Tongva Indians of California Tribal Council ▪ Ewiiaapaayp Tribal Office
▪ Pala Band of Mission Indians
▪ Gabrielino/Tongva nation
▪ Mesa Grande Band of Diegueno Mission Indians
▪ Sycuan Band of Kumeyaay Nation
▪ Gabrieleno/Tongva San Gabriel Band of Mission Indians ▪ La Posta Band of Diegueno Mission Indians
▪ Santa Rosa Band of Cahuilla Indians
▪ Soboba Band of Luiseno Indians
▪ Gabrieleno Band of Mission Indians – Kizh Nation
▪ Manzanita Band of Kumeyaay Nation
▪ Cahuilla Band of Indians
▪ Juaneño Band of Mission Indians Acjachemen Nation – Belardes ▪ Juaneño Band of Mission Indians Acjachemen Nation 84A ▪ Campo Band of Diegueno Mission Indians
Three responses were received. The Pala Band of Mission Indians notified the City that the project site is not within the boundaries of the recognized Pala Indian Reservation, and beyond the territory that the tribe
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
April 2025 Page 23
considers its traditional use area. The Pala Band of Mission Indians have declined AB-52 consultation. The Santa Rosa Band of Cahuilla Indians deferred to the Soboba Band of Luiseno Indians Cultural Resources Department and did not request additional consultation. The Gabrieleño Band of Mission Indians – Kizh Nation requested consultation with the City in accordance with AB52. Consultation with the Gabrieleño Band of Mission Indians - Kizh Nation has concluded. The City is in compliance with Public Resources Code section 21080.3.1.
Refer to Section 3.18, Tribal Cultural Resources.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
2.2 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a “Potentially Significant Impact,” as indicated by the checklist on the following pages.
Aesthetics Agriculture / Forestry Resources Air Quality Biological Resources Cultural Resources Energy
Geology/Soils Greenhouse Gas Emissions Hazards and Hazardous Materials Hydrology/Water Quality Land Use / Planning Mineral Resources Noise Population / Housing Public Services
Recreation Transportation Tribal Cultural Resources
Utilities / Service Systems Wildfire Mandatory Findings of Significance
2.3 DETERMINATION (TO BE COMPLETED BY THE LEAD AGENCY)
On the basis of this initial evaluation:
I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.
I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.
I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project, nothing further is required.
Signature Date
4/29/2025
Cesar Rangel Public Works Director/City Engineer
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
April 2025 Page 25
2.4 EVALUATION OF ENVIRONMENTAL IMPACTS
1. A brief explanation is required for all answers except “No Impact” answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A “No Impact” answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A “No Impact” answer should be explained where it is based on project-specific factors, as well as general standards (e.g., the project would not expose sensitive receptors to pollutants, based on a project-specific screening analysis).
2. All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts.
3. Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. “Potentially Significant Impact” is appropriate if there is substantial evidence that an effect may be significant. If there are one or more “Potentially Significant Impact” entries when the determination is made, an EIR is required.
4. “Negative Declaration: Less Than Significant With Mitigation Incorporated” applies where the incorporation of mitigation measures has reduced an effect from “Potentially Significant Impact” to a “Less Than Significant Impact.” The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level.
5. Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following:
a) Earlier Analyses Used. Identify and state where they are available for review. b) Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. c) Mitigation Measures. For effects that are “Less than Significant with Mitigation Measures Incorporated,” describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project.
6. Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated.
7. Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
8. This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project’s environmental effects in whatever format is selected.
9. The explanation of each issue should identify:
a) the significance criteria or threshold, if any, used to evaluate each question; and b) the mitigation measure identified, if any, to reduce the impact to less than significance.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
April 2025 Page 27
3. Environmental Analysis
This section provides an evaluation of the impact categories and questions contained in the checklist and identifies mitigation measures, if applicable.
3.1 AESTHETICS
Except as provided in Public Resources Code Section 21099, would the project:
Issues
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
I. AESTHETICS. Except as provided in Public Resources Code Section 21099, would the project:
a) Have a substantial adverse effect on a scenic vista? X b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
X
c) In nonurbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?
X
d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? X
a) Have a substantial adverse effect on a scenic vista? No Impact. A scenic vista is a viewpoint that provides expansive views of a highly valued landscape for the benefit of the public. The City of Stanton General Plan does not identify any scenic vistas (Stanton 2008). The project site is surrounded by urban development, including commercial and residential uses, Carver Early Education Center, and Stanton Park. The proposed project would redevelop the existing Norm Ross Sports Park, which is currently closed due to poor site conditions, with modern park and sports facilities. The proposed project would be designed to be visually appealing with modern facilities, one-story community building, onestory garden storage building, landscaping, and hardscaping that would be typical of park/sport uses and visually similar to the adjacent Stanton Park and surrounding one to two-story buildings. Therefore, implementation of the proposed project would not obstruct or alter views, and no impacts to scenic vistas would occur.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
No Impact. A scenic highway is a stretch of public roadway that is designated as a scenic corridor by a federal, state, or local agency. Caltrans defines a scenic highway as any freeway, highway, road, or other public right-ofway that traverses an area of exceptional scenic quality.
The project site is in a highly urbanized area of the City and is not on or near a state-designated scenic highway, as designated on the California Scenic Highway Mapping System of the California Department of Transportation. The nearest officially designated state scenic highway is State Route (SR) 91 from SR 55 to east city limit of Anaheim, which is approximately 10 miles northeast of the project site (Caltrans 2024). The nearest eligible state scenic highway is State Route 1, approximately 7 miles southwest of the project site. Due to the distance and intervening development and vegetation, the project site is not visible from the officially designated scenic highway.
Furthermore, the proposed project would redevelop the existing sports complex, which is currently closed due to its poor condition, with modern and improved facilities. There are no scenic resources on or near the project site. No scenic resources would be damaged, and no impact would occur. c) In nonurbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less Than Significant Impact. The project site is already developed as a sports park and is in an urbanized area surrounded by Stanton Park to the north, Carver Early Education Center to the west, residential uses to the south, and a motel and commercial/retail uses to the east. The City of Stanton General Plan designates the project site as Public/Institutional and the zoning designation is “PI” Public Institutional. The proposed project would not change the current zoning designation and a sports park is a permitted use under the PI zoning (Stanton 2008). There are no specific building standards that govern scenic quality in PI zone. As stated in the General Plan, the visual identity of Stanton includes the City’s physical form, activity nodes, landmarks, street corridors, buildings, signs and other similar physical features (Stanton 2008). The proposed project supports Goal CD-1.1, “[p]romote quality development and design that preserves and enhances a positive and unique image of Stanton, and fosters a sense of community pride”, by providing modern and upgraded park and sport complex facilities at a park site that is currently closed due to poor site conditions.
Goal CD-1.2 of the General Plan states, “Promote an attractive streetscape and public right-of-way, especially along major primary and secondary corridors, that is consistent with the desired vision and image of Stanton.” Goal CD-1.3 states, “Promote compatibility between land uses, including existing, redeveloped, and new uses, to further cohesiveness along the city’s primary and secondary corridors.” Katella Avenue to the north of the project site and Beach Boulevard to the east of the project site are identified as major arterial and principal arterial roadways by the General Plan. The proposed project is approximately 230 feet away from Beach Boulevard and approximately 750 feet from Katella Avenue. Due to surrounding intervening development, the project site would not be readily seen from these locations, and the proposed project does not include
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
April 2025 Page 29
improvements to Katella Avenue nor Beach Boulevard. Nevertheless, the proposed project would redevelop an existing park/sports complex with modern, upgraded park and sports facilities. The proposed project is consistent with the existing land use designation on the project site. The modern and upgraded park and sports facilities would be visually appealing and consistent with the surrounding development and would support the desired vision and image of Stanton. The proposed project would not hinder Goal CD-1.2 nor Goal CD-1.3.
The proposed project would be required to comply with the development standards pursuant to the City of Stanton Building Codes and Construction Regulations, including the California Building Code (Title 24, Part 2), the California Energy Code (Title 24, Part 6), the California Fire Code (Title 24, Part 9), and the California Green Building Standards Code (Title 24, Part 11).
The site and lighting plans are also required to be reviewed and approved by the Division of the State Architect (DSA) since it’s a joint use park with Garden Grove USD. Therefore, the proposed project would not conflict with any applicable zoning and other regulations governing scenic quality, and impacts would be less than significant.
d) Create a new source of substantial light or glare, which would adversely affect day or nighttime views in the area?
Less Than Significant Impact.
Terminology
The foot-candle (fc) is a unit based on English measurements. Although foot-candles are considered obsolete in some scientific circles, they are nevertheless used because many existing light meters are calibrated in footcandles. Moonlight produces approximately 0.01 fc, and sunlight can produce up to 10,000 fc. The general benchmarks for light levels are shown in Table 1, General Light Levels Benchmark.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
Table 1 General Light Levels Benchmark
Outdoor Light Foot-Candles
Direct Sunlight 10,000
Full Daylight 1,000
Overcast Day 100
Dusk 10
Twilight 1
Deep Twilight 0.1
Full Moon 0.01
Quarter Moon 0.001
Moonless Night 0.0001
Overcast Night 0.00001
Gas station canopies 25–30
Typical neighborhood streetlight and parking garage 1.0–5.0 ▪ Horizontal foot-candle. The amount of light received on a horizontal surface such as a roadway or parking lot pavement.
▪ Vertical foot-candle. The amount of light received on a vertical surface such as a billboard or building façade.
▪ Glare means lighting entering the eye directly from a light fixture or indirectly from reflective surfaces that causes visual discomfort or reduced visibility. Glare can be generated by building-exterior materials, surfacepaving materials, vehicles traveling or parked on roads and driveways, and sports lights. Any highly reflective façade material is a concern because buildings can reflect bright sunrays. The concepts of spill light, direct glare, and light trespass are illustrated in Exhibit B, Spill Light, Direct Glare, and Light Trespass, adapted from the Institution of Lighting Engineers (ILE 2003).
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
April 2025 Page 31
Exhibit A: Spill Light, Direct Glare, and Light Trespass ▪ Direct glare is caused by looking at an unshielded lamp or a light at maximum candlepower. Direct glare is dependent on the brightness of the light source, the contrast in brightness between the light source and the surrounding environment, the size of the light source, and its position. ▪ Illuminance is the amount of light on a surface or plane, typically expressed in a horizontal plane (e.g., on the ground) or in a vertical plane (e.g., on the side of a building). ▪ Lumen means the unit of measure used to quantify the amount of visible light produced by a light source or emitted from a luminaire (as distinct from “watt,” a measure of power consumption). ▪ Luminaire means outdoor electrically powered illuminating devices that include a light source, outdoor reflective or refractive surfaces, lenses, electrical connectors and components, and all parts used to mount the assembly, distribute the light, and/or protect the light source, whether permanently installed or portable.
An important component of luminaires is their shielding:
⚫ Fully shielded. A luminaire emitting no light above the horizontal plane. ⚫ Shielded. A luminaire emitting less than 2 percent of its light above the horizontal plane. ⚫ Partly shielded. A luminaire emitting less than 10 percent of its light above the horizontal plane. • Unshielded. A luminaire that may emit light in any direction.
Light trespass. Spill light that, because of quantitative, directional, or type of light, causes annoyance, discomfort, or loss in visual performance and visibility. Light trespass is light cast where it is not wanted or needed, such as light from a streetlight or a floodlight that illuminates someone’s bedroom at night, making it difficult to sleep. As a general rule, taller poles allow fixtures to be aimed more directly on the playing surface, which reduces the amount of light spilling into surrounding areas. Proper fixture angles ensure even light
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
distribution across the playing area and reduce spill light, as shown in Exhibit B, Spill Light, Direct Glare, and Light Trespass.
▪ Sky Glow is light that reflects into the night sky and reduces visibility of the sky and stars. It is a concern in many jurisdictions, especially those with observatories. ▪ Spill light is caused by misdirected light that illuminates areas outside the area intended to be lit. Spill light can contribute to light pollution.
Municipal Code
Stanton Municipal Code Section 20.300.080(B)(2) states lighting levels shall not exceed 0.5 fc on any common property line zoned, used as, or planned for residential uses (Stanton 2024). The proposed project site is bound by residential uses to the south. Therefore, for the purposes of this analysis 0.5 fc was used for a significance determination.
Lighting and Glare
The proposed project includes four 50-foot tall and six 60- to 70-foot-tall light poles around the dog park, multipurpose court, and baseball and soccer field as well as pedestrian scale lights throughout the project site to support the park’s uses and for safety and security. Though the project site is already developed as a sports park with seven sport lighting poles, the park is not in use and thus the lights are not currently in use. Therefore, all the proposed lighting features would add additional light and glare to the project site compared to existing conditions. The nearest light and glare sensitive receptors are the single-family residences adjacent to the project site to the south.
The buildout of the proposed project would result in more reflective surfaces compared to existing conditions on the project site, such as a new community building, bleachers, and light-colored surfaces. The location of the proposed building would be located away from sensitive receptors. Proposed landscaping, surrounding vegetation and buildings, and shade structures would further block reflective surfaces from generating substantial glare. Further, the proposed project would construct a new 8-foot (ft) concrete masonry unit (CMU) block wall along southern and eastern boundaries of the project site. The new 8-ft CMU block wall would further block light and glare to the residential uses to the south and commercial uses and roadway to the east.
Therefore, the proposed project would not create a new source of substantial glare.
The proposed project’s lights would be shielded and downward facing, which focuses light on the desired area.
As shown in Figure 7, Field Lighting Property Line Light Spill, the proposed field lights would generate between
0.0 to 0.50 horizontal fc along the southern property line. The proposed projects light would meet the City of Stanton’s 0.5 fc threshold pursuant to Stanton Municipal Code Section 20.300.080(B)(2), thus impacts would be considered less than significant. Additionally, the proposed 8-ft block wall would further block light from spilling onto the residential properties. Therefore, the proposed project would not create a substantial new source of lighting.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
April 2025 Page 33
Further, the proposed project would be required to comply with Chapter 20.300.080, Outdoor Light and Glare, of the Stanton Municipal Code. Section E, Outdoor Recreation/Entertainment Areas, states that for facilities used for outdoor recreation within 200 feet of a residential zone, lighting is subject to the approval of a Minor Site Plan and Design Review. The southern end of the project site is within 200 feet of a residential zone; thus, the proposed project would need to be reviewed by the City prior to development.
The proposed project is in an urban environment surrounded by urban development, and the proposed project would include typical park and sports facilities that are common in an urban environment. The proposed project would not create a new source of substantial glare that would adversely affect day or nighttime views. The proposed project would not significantly impact nighttime nor daytime views. in the area, and a less than significant impact would occur.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
This page intentionally left blank.
A1
A2
B2
B1
S1
C1
BA1
BA2
P1
P2
0.0 0.0
0.0 0.0
0.0 0.0
0.1 0.2
0.4 0.5
0.3 0.2
0.2 0.3
0.3 0.2
0.1 0.0
0.0 0
Scale (Feet)
80 NORM ROSS SPORTS PARK IMPROVEMENT PROJECT INITIAL STUDY
CITY OF STANTON
Figure 7 - Field Lighting Property Line Light Spill
1. Introduction
Source: MUSCO 2024.
Norm Ross Sports Park
Stanton,CA
Grid Summary Name Property Line Spill
Spacing 30.0'
Height 3.0' above grade
Illumination Summary INITIAL HORIZONTAL FOOTCANDLES
Entire Grid
Scan Average 0.1493
Maximum 0.49
Minimum 0.00
CU 0.00
No. of Points 19
LUMINAIRE INFORMATION
Applied Circuits A,B,C,D,E,F
No. of Luminaires 40
Total Load 31.51 kW
Equipment List For Areas Shown Pole Luminaires
QTY LOCATION SIZE GRADE
ELEVATION
ABOVE GRADE
LEVEL LUMINAIRE TYPE QTY/POLE THISGRID
2 A1-A2 60' - 60' TLC-LED-900 3 3
15.5' TLC-BT-575 1 1
1 B1 70' - 70' TLC-LED-1200 3 3
70' TLC-LED-550 2* 2
70' TLC-LED-900 2 2
15.5' TLC-BT-575 1 1
1 B2 70' - 70' TLC-LED-1200 3 3
70' TLC-LED-900 2 2
15.5' TLC-BT-575 1 1
4 BA1-BA2
P1-P2 50' - 50' TLC-LED-550 2 2
1 C1 70' - 70' TLC-LED-1200 4 4
15.5' TLC-BT-575 2 2
1 S1 70' - 70' TLC-LED-550 4 4
10 Totals 40 40
Not to be reproduced in whole or part without the wri�en consent of Musco Sp IGN By: Vashon Alexander • File #227354AR1 • 02Oct24 Li h�LLC©19812023 MStLih�LLC
1 : 80
80' 160'
Grid Summary
Name Property Line Spill
Spacing 30.0'
Height 3.0' above grade
Illumination Summary INITIAL HORIZONTAL FOOTCA
Entire Grid
Scan Average 0.1493
Maximum 0.49
Minimum 0.00
CU 0.00
No. of Points 19
LUMINAIRE INFORMATION
Applied Circuits A,B,C,D,E,F
No. of Luminaires 40
Total Load 31.51 kW
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described
above is guaranteed per your Musco Warranty
document.
Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.
Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.
Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.
ILLUMINATION SUMMARY
Not to be reproduced in whole or part without the wri�en consent of Musco Sports ENGINEERED DESIGN By: Vashon Alexander • File #227354A_R1 • 02-Oct-24 Ligh�ng, LLC. ©1981, 2023 Musco Sports Ligh�ng, LLC.
A1
A2
B2
B1
S1
C1
BA1
BA2
P1
P2
0.0 0.0
0.0 0.0
0.0 0.0
0.1 0.2
0.4 0.5
0.3 0.2
0.2 0.3
0.3 0.2
0.1 0.0
0.0 SCALE IN FEET 1 : 80
0' 80' 160'
Pole location(s) dimensions are relative
to 0,0 reference point(s)
Guaranteed Performance: The ILLUMINATION described above is guaranteed per your Musco Warranty document.
Field Measurements: Individual field measurements may vary from computer-calculated predictions and should be taken in accordance with IESNA RP-6-15.
Electrical System Requirements: Refer to Amperage
Draw Chart and/or the "Musco Control System Summary"
for electrical sizing.
Installation Requirements: Results assume ± 3%
nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locations.
0.0 0.0
0.0 0.0
0.0 0.
OTHER
GRIDS
0 0
0 0
0 0
0 0
0 0
0 0
0 0
*This structure utilizes a back-to-back mounting configuration *Above Grade level relative to the field
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
This page intentionally left blank.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
April 2025 Page 37
3.2 AGRICULTURE AND FORESTRY RESOURCES
In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland.
In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board (CARB). Would the project:
Issues
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
II. AGRICULTURE AND FORESTRY RESOURCES. In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board. Would the project:
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps
prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to nonagricultural use? X
b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? X
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code
Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))?
X
d) Result in the loss of forest land or conversion of forest land to non-forest use? X
e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
X
a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? No Impact. The project site has no agricultural or farm use on it, nor is there agricultural or farm use in its immediate proximity. No project-related farmland conversion would occur. The proposed project would
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
rehabilitate an underutilized sports park in an urban area. The project site is zoned “PI” Public Institutional and is listed as Urban and Built-Up Land, not an important farmland by the Division of Land Resource Protection (Stanton 2008; DOC 2022). Therefore, no impact would occur. b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? No Impact. The zoning designation for the project site is “PI” Public Institutional. The proposed project would not conflict with agricultural zoning or a Williamson Act contract because it is not zoned for agricultural use Stanton 2008; (DOC 2022). Williamson Act contracts restrict the use of privately owned land to agriculture and compatible open-space use under contract with local governments; in exchange, the land is taxed based on actual use rather than potential market value. Since the project site is zoned “PI” Public Institutional, there is no Williamson Act contract in effect on-site. The existing community garden on-site is not considered an agricultural use. Therefore, no impact would occur.
c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))? No Impact. Forest land is defined as “land that can support 10-percent native tree cover of any species, including hardwoods, under natural conditions, and that allows for management of one or more forest resources, including timber, aesthetics, fish and wildlife, biodiversity, water quality, recreation, and other public benefits” (California PRC § 12223 [g]). Timberland is defined as “land…which is available for, and capable of, growing a crop of trees of any commercial species used to produce lumber and other forest products, including Christmas trees” (California PRC § 4526). The project site is zoned “PI” Public Institutional and is currently developed as a sports park that is not in use (Stanton 2008). No forest land nor timberland exists onsite. Project implementation would not conflict with existing zoning for forest land, timberland, or timberland production.
No impact would occur.
d) Result in the loss of forest land or conversion of forest land to non-forest use? No Impact. As stated in above Section 3.2(c), the project site is not a forest land. Vegetation on-site is limited to ornamental vegetation. Project implementation would not result in the loss or conversion of forestland.
Therefore, no impact would occur.
e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
No Impact. The City of Stanton, including the project site, is listed as Urban and Built-Up Land and is not mapped as important farmland by the Division of Land Resource Protection (DOC 2022). Project development would not indirectly cause the conversion of such land to nonagricultural or nonforest use.
Therefore, no impact would occur.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
April 2025 Page 39
3.3 AIR QUALITY
The Air Quality section addresses the impacts of the proposed project on ambient air quality and the exposure of people, especially sensitive individuals, to unhealthy pollutant concentrations. A background discussion on the air quality regulatory setting, meteorological conditions, existing ambient air quality in the vicinity of the project site, and air quality modeling can be found in Appendix A.
The primary air pollutants of concern for which ambient air quality standards (AAQS) have been established are ozone (O3), carbon monoxide (CO), coarse inhalable particulate matter (PM10), fine inhalable particulate matter (PM2.5), sulfur dioxide (SO2), nitrogen dioxide, and lead (Pb). Areas are classified under the federal and California Clean Air Act as either in attainment or nonattainment for each criteria pollutant based on whether the AAQS have been achieved. The South Coast Air Basin (SoCAB), which is managed by the South Coast Air Quality Management District (South Coast AQMD), is designated nonattainment for O3, and PM2.5 under the California and National AAQS, nonattainment for PM10 under the California AAQS, and nonattainment for lead (Los Angeles County only) under the National AAQS (CARB 2024).
Furthermore, the South Coast AQMD has identified regional thresholds of significance criteria for pollutant emissions and criteria air pollutant precursors, including volatile organic compounds (VOCs), CO, nitrogen oxide (NOx), SO2, PM10, and PM2.5. Development projects below the regional significance thresholds are not expected to generate sufficient criteria pollutant emissions to violate any air quality standard or contribute substantially to an existing or projected air quality violation. Where available, the significance criteria established by the South Coast AQMD may be relied upon to make the following determinations. Would the project:
Issues
Potentially
Significant
Impact
Less Than
Significant
With
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
III. AIR QUALITY. Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations. Would the project:
a) Conflict with or obstruct implementation of the applicable air quality plan? X
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard?
X
c) Expose sensitive receptors to substantial pollutant
concentrations? X
d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people? X
a) Conflict with or obstruct implementation of the applicable air quality plan? Less Than Significant Impact. The South Coast AQMD adopted the 2022 Air Quality Management Plan (AQMP) on December 2, 2022. Regional growth projections are used by South Coast AQMD to forecast future emission levels in the SoCAB. For southern California, these regional growth projections are provided by the
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
Southern California Association of Governments (SCAG) and are partially based on land use designations included in city/county general plans. Typically, only large, regionally significant projects have the potential to affect regional growth projections. In addition, the consistency analysis is generally only required in connection with the adoption of General Plans, specific plans, and significant projects. Changes in population, housing, or employment growth projections have the potential to affect SCAG’s demographic projections and therefore the assumptions in South Coast AQMD’s AQMP. These demographic trends are incorporated into SCAG’s 2020–2045 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS) to determine priority transportation projects and vehicle miles traveled (VMT) in the SCAG region.
Changes in population, housing, or employment growth projections have the potential to affect SCAG’s demographic projections and therefore the assumptions in South Coast AQMD’s AQMP. As further described in Section 1.4.1, Proposed Land Use, the proposed project would involve redeveloping the existing Norm Ross Sports Park, including construction of a new community building as well as a new community garden building, playgrounds, sports courts and fields, landscaping, and hardscaping. In addition, as described in Section 3.14, Population and Housing, the proposed project would not propose new homes and would not induce substantial unplanned population growth in the area directly or indirectly. Therefore, the proposed project would not be a regionally significant project that has the potential to result in changes in population, housing, or employment in the City of Stanton. Due to the nature of the proposed project, it would not result in new long-term employment. Construction activities associated with the proposed project would result in short-term employment only and would end upon completion.
Additionally, as demonstrated below in Section 3.3(b), the regional emissions that would be generated by the operational phase of the proposed project would be less than the South Coast AQMD emissions thresholds and would therefore not be considered by South Coast AQMD to be a substantial source of air pollutant emissions that would have the potential to affect the attainment designations in the SoCAB. Therefore, the proposed project would not affect the regional emissions inventory or conflict with strategies in the AQMP.
Impacts would be less than significant.
b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or state ambient air quality standard? Less Than Significant Impact. The following describes project-related impacts from regional short-term construction activities and regional long-term operation of the proposed project.
Regional Short-Term Construction Impacts
Construction activities would generate air pollutants. These emissions would primarily be 1) exhaust from offroad diesel-powered construction equipment; 2) dust generated by construction activities; 3) exhaust from onroad vehicles; and 4) off-gassing of VOCs from paints and asphalt.
Construction activities associated with the proposed project are anticipated to disturb approximately 4.2 acres on the project site. The proposed project would involve demolition, site preparation and soil haul, rough grading and soil haul, fine grading and soil haul, utilities trenching, building construction, paving, architectural coating, and finishing/landscaping. Construction would occur from October 2024 to September 2025. Construction
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
April 2025 Page 41
emissions were estimated using the California Emissions Estimator Model (CalEEMod), Version 2022.1, and are based on the preliminary construction duration provided by the City. The results of the construction emissions modeling are shown in Table 2, Maximum Daily Regional Construction Emissions and shows that the maximum daily emissions for NOX, CO, SO2, PM10, and PM2.5 from construction-related activities would be less than their respective South Coast AQMD regional significance threshold values.
Table 2 Maximum Daily Regional Construction Emissions
Construction Phase 3
Pollutants
(lb/day)1, 2
VOC NOX CO SO2 PM10 PM2.5
Demolition 3 25 23 <1 2 1
Site Preparation 4 59 45 <1 15 7
Rough Grading 2 23 22 <1 6 3
Fine Grading 2 22 22 <1 5 3
Utility Trenching <1 3 3 <1 <1 <1
Building Construction 2024 1 11 13 <1 1 <1
Building Construction 2025 1 10 13 <1 <1 <1
Building Construction 2025, Paving, and Architectural
Coating
5 18 24 <1 1 1
Building Construction 2025, Paving, Architectural Coating, and Finishing/Landscaping
6 20 27 <1 1 1
Maximum Daily Construction Emissions
Maximum Daily Emissions 6 59 45 <1 15 7
South Coast AQMD Regional Construction Threshold 75 100 550 150 150 55 Significant? No No No No No No
Source: CalEEMod Version 2022.1.
1 Based on the preliminary information provided by the City. Where specific information regarding project-related construction activities was not available, construction assumptions were based on CalEEMod defaults, which are based on construction surveys conducted by South Coast AQMD of construction equipment. 2 Includes implementation of fugitive dust control measures required by South Coast AQMD under Rule 403, including watering disturbed areas a minimum of two times per day, reducing speed limit to 25 miles per hour on unpaved surfaces, replacing ground cover quickly, and street sweeping with Rule 1186–compliant sweepers.
3 For CalEEMod modeling, a 5,000-square-foot building was modeled which is larger than the proposed 3,588-square-foot buildings (2,533-square-foot park building and 1,055-square-foot Garden storage Building) and provides a conservative analysis.
Long-Term Operation-Related Air Quality Impact
Typical long-term air pollutant emissions are generated by area sources (e.g., landscape fuel use, aerosols, architectural coatings, and asphalt pavement), energy use (natural gas), and mobile sources (i.e., on-road vehicles). As identified in Section 3.17, Transportation, and in Appendix F, the proposed project would generate 279 non-summer weekday vehicle trips and 415 summer weekday vehicle trips1 and 438 weekend vehicle trips (Garland and Associates 2023). As shown in Table 3, Maximum Daily Regional Operation Emissions, it is anticipated 1 Modeling assumed an average of 313 weekday vehicle trips based on summer weekday trips occurring during 25 percent of the year and non-summer weekday trips occurring over 75 percent of the year.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
that operation of the proposed project would result in minimal emissions overall and would not exceed the South Coast AQMD regional operation-phase significance thresholds. Impacts to the regional air quality associated with operation of the proposed project would be less than significant.
Table 3 Maximum Daily Regional Operation Emissions
Source
Maximum Daily Emissions (lbs/Day)
VOC NOX CO SO2 PM10 PM2.
Emissions
Mobile1 1 1 14 <1 3 1
Area <1 <1 <1 <1 <1 <1
Energy2,3 <1 <1 <1 <1 <1 <1
Total 2 1 14 <1 3 1
South Coast AQMD Regional
Threshold 55 55 550 150 150 55
Exceeds Threshold? No No No No No No
Source: CalEEMod Version 2022.1.
Notes: lbs: Pounds. Highest winter or summer emissions report. 1 Mobile emission calculations consider 438 vehicle trips as provided by Garland and Associates to estimate the maximum daily operational emissions. 2 Estimated natural gas consumption based on health club energy rates from EDFZ 7 from CalEEMod Appendix G, Default Data Tables, as an approximation since CalEEMod "City Park" land use default rates do not account for natural gas use. 3 For CalEEMod modeling, a 5,000-square-foot building was modeled which is larger than the proposed 3,588-square-foot buildings (2,533-square-foot park building and 1,055-square-foot Garden storage Building) and provides a conservative analysis. c) Expose sensitive receptors to substantial pollutant concentrations? Less Than Significant Impact. The proposed project could expose sensitive receptors to elevated pollutant concentrations if it causes or significantly contributes to elevated pollutant concentration levels. Unlike regional emissions, localized emissions are typically evaluated in terms of air concentration rather than mass so they can be more readily correlated to potential health effects.
Construction LSTs
Localized significance thresholds (LSTs) are based on the California AAQS, which are the most stringent AAQS to provide a margin of safety in the protection of public health and welfare. They are designated to protect sensitive receptors most susceptible to further respiratory distress, such as asthmatics, the elderly, very young children, people already weakened by other disease or illness, and people engaged in strenuous work or exercise.
The screening-level construction LSTs are based on the size of the project site, distance to the nearest sensitive receptor, and Source Receptor Area (SRA). The nearest offsite sensitive receptors to the project site are the single-family residences along Ruthann Avenue and Ale Lane directly south of the project site.
Air pollutant emissions generated by construction activities would cause temporary increases in air pollutant concentrations. Table 4, Localized Construction Emissions, shows that the maximum daily construction emissions (pounds per day) generated during onsite construction activities compared with the South Coast AQMD Screening-level LSTs, for sensitive receptors within 82 feet (25 meters). As shown in Table 4, the construction-
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis
April 2025 Page 43
related onsite emissions would not exceed the screening-level LSTs, except for PM10 and PM2.5 during the site preparation phase.
Table 4 Localized Construction Emissions
Construction Activity3
Pollutants(lbs/day)1
NOX CO PM102 PM2.52
South Coast AQMD ≤1.00 Acre LST 81 485 4.00 3.00
Demolition 25 22 1.47 1.02
Utility Trenching 3 3 0.13 0.12
Exceeds LST? No No No No
South Coast AQMD 1.31 Acre LST 92 557 4.62 3.31
Building Construction 2024 11 13 0.50 0.46
Building Construction 2025 10 13 0.43 0.40
Exceeds LST? No No No No
South Coast AQMD 1.81 Acre LST 109 672 5.62 3.81
Building Construction 2025, Paving, and Architectural Coating 18 23 0.75 0.69 Building Construction 2025, Paving, Architectural Coating, and Finishing/Landscaping
19 25 0.81 0.75
Exceeds LST? No No No No
South Coast AQMD 2.50 Acre LST 126 805 7.16 4.50
Rough Grading 18 19 4.37 2.19
Fine Grading 18 19 4.37 2.19
Exceeds LST? No No No No
South Coast AQMD 3.50-Acre LSTs 149 984 9.50 5.50
Site Preparation 37 34 10.41 5.56
Exceeds LST? No No Yes Yes
Source: CalEEMod Version 2022.1. South Coast AQMD 2008, 2011, and 2023.
Notes: In accordance with South Coast AQMD methodology, only onsite stationary sources and mobile equipment are included in the analysis. Screening level LSTs are based on receptors within 82 feet (25 meters) in SRA 17. 1 Where specific information for project-related construction activities or processes was not available modeling was based on CalEEMod defaults. These defaults are based on construction surveys conducted by the South Coast AQMD. 2 Includes fugitive dust control measures required by South Coast AQMD under Rule 403, such as watering disturbed areas a minimum of two times per day, reducing speed limit to 25 miles per hour on unpaved surfaces, replacing ground cover quickly, and street sweeping with Rule 1186–compliant sweepers. 3 For CalEEMod modeling, a 5,000-square-foot building was modeled which is larger than the proposed 3,588-square-foot buildings (2,533-square-foot park building and 1,055-square-foot garden storage building) and provides a conservative analysis.
However, as shown in Table 5, implementation of Mitigation Measure AQ-1, which requires the construction contractor(s) to water exposed ground surfaces and disturbed areas three times a day during earthmoving activities (i.e., site preparation, rough grading, and fine grading), would reduce construction-related emissions below the South Coast AQMD screening-level LST. Therefore, air quality impacts from project-related construction activities would be less than significant with incorporation of mitigation.
N O R M R O S S S P O R T S P A R K I M P R O V E M E N T P R O J E C T I N I T I A L S T U D Y / M I T I G A T E D N E G A T I V E D E C L A R A T I O N
C I T Y O F S T A N T O N
3. Environmental Analysis