I. THE PARTIES TO THE AGREEMENT
This Agreement is made and entered into this 1
st day of July, 2022, by and between City of Stockton,
an Independent CONTRACTOR (hereinafter “CONTRACTOR”), and San Joaquin County, a political subdivision of the State of California for PROBATION (hereinafter “COUNTY”).
II. THE PURPOSE OF THE AGREEMENT
The purpose of this agreement is for the CONTRACTOR to provide the Community Corrections Partnership (CCP) Task Force services for San Joaquin County’s Public Safety Realignment program (AB109) which include reducing crimes committed by AB109 offenders, promote the CCP, and support the premise of prison realignment.
III. ORDER FOR PRECEDENCE
A. Each of the items listed below is hereby incorporated into this Agreement by this reference. In the event of an inconsistency in this Agreement, the inconsistency shall be resolved by giving precedence in the following order:
1. Applicable Federal and State of California statutes and regulations.
2. This Agreement.
3. The attachment marked EXHIBIT A - San Joaquin County Public Safety Realignment Request Form submitted on behalf of the Police Departments of San Joaquin County to the Community Corrections Partnership (CCP).
IV. THE SCOPE OF SERVICES
A. Scope of Professional Services:
CONTRACTOR agrees to coordinate a Community Corrections Partnership (CCP) Task Force involving City Police Departments throughout San Joaquin County. CONTRACTOR will serve as the host agency and provide necessary office space. CONTRACTOR will provide:
- (1) Police Sergeant, responsible for day-to-day supervision of all Task Force members and their activities.
- (4) Police officers from other city jurisdictions within San Joaquin County will collectively determine which of their agencies will employ those personnel for full time assignment to the Task Force and
- (1) Sheriff Deputy for Lathrop.
- Overtime will be shared amongst the Task Force Members.
Police Departments that do not participate with full-time staff may contribute part-time staff on a voluntary and/or ad hoc basis. All police agencies in San Joaquin County will have access to the Task Force services and resources, regardless of their level of participation.
ATTACHMENT A 825
Agreement/Contract: City of Stockton
FY: 2022-2023
B. Command and Control:
The host agency will be responsible for the day-to-day operation of the Task Force. The Task Force supervisor (Stockton Police Department Sergeant) will report to a Stockton Police Department manager, as designated by the Stockton Police Chief. For general oversight and administration purposes, the police manager will report to the Police Chief member of the CCP’s Executive Board. The CCP’s Police Chief Representative will report to the CCP Executive Board on Task Force activities, as necessary.
C. Mission and Scope:
The mission of the Task Force is to protect the quality of life in our communities by:
Reducing crimes committed by AB 109 offenders;
Promoting the work of the Community Corrections Partnership; and Supporting the premise of prison realignment.
The Task Force will focus on problematic realignment offenders, including those who:
Wanted for a compliance violation and/or a new crime
Have a history of violence
Have been deemed a repeat offender
Have been deemed at high risk of becoming a repeat offender.
The Task Force will use the well-known and effective Problem-Oriented Policing (POP) model. Activity and deployment strategies will include:
Utilizing crime analysis data, offender data, and other information to prioritize work and ensure deployment practices and activities are conducted effectively and efficiently.
Conducting frequent offender compliance checks, especially during weekends and evening hours.
Initiate contact and become familiar with offenders recently released from custody.
Actively searching for wanted persons, especially those identified as serious or habitual offenders or who are likely to commit new crimes. Working closely with patrol, investigations, and various special enforcement units in the area to gather, analyze, and exchange criminal intelligence information.
Frequently deploy to community “hot spots” and other areas where offenders are likely to gather and crime often occurs.
Working closely with the Probation Department and other agency partners to encourage offenders to comply with the terms of their release, participate in vast programming opportunities, and avoid committing new offenses. Serving as an individual and collective resource that can help educate members of each law enforcement agency on the purpose and intent of realignment.
ATTACHMENT A 826
Agreement/Contract: City of Stockton
FY: 2022-2023
Working a flexible schedule which may include various evenings, nights, weekends, and holidays. This is necessary to provide attention to offenders when Probation Officers and other personnel are not at work.
CONTRACTOR shall perform the CONTRACTOR’S work in accordance with currently approved methods and standards of practice in the CONTRACTOR’S professional specialty.
V. GENERAL PROVISIONS
A. Term of Agreement:
This Agreement shall commence when fully executed through the 30th day of June, 2023, unless said work is completed on a date prior thereto or unless terminated earlier as provided herein or extended upon mutual agreement.
B. Interpretation:
This Agreement shall not be interpreted in favor of any Party by virtue of said Party not having prepared this Agreement.
If any time period provided for in this Agreement ends on the day other than a Business Day, the time period shall be extended to the next Business Day.
C. Compensation:
COUNTY agrees to pay the CONTRACTOR federal and state payroll taxes such as social security and unemployment for staff performing services under the scope of this contract.
COUNTY agrees to pay CONTRACTOR benefit costs to staff performing services under the scope of this contract.
The COUNTY agrees to pay the CONTRACTOR the hourly amounts as indicated on the CONTRACTOR’s hourly rate sheet. The total payments made for services performed pursuant to this Agreement shall be per task on an actual cost basis and shall not exceed identified per task costs. Notwithstanding the foregoing, the total contract shall not exceed ONE MILLION THREE HUNDRED FIFTY-SIX THOUSAND SEVEN HUNDRED EIGHTYTWO DOLLARS and NO/CENTS ($1,356,782.00).
The COUNTY will issue a Form 1099 at year-end for fees earned.
D. Invoicing:
The CONTRACTOR shall submit invoices on a monthly basis, by the 15th of each month.
The invoice must be accompanied by supporting documentation including, but not limited to, General Ledger detail, Payroll Register, and Personnel Activity Report(s). The monthly billing format shall clearly indicate the current period of request for payment, original budget amount, amount requested for the current billing period, cumulative expenditures through the current period of request for payment, and budget balance after ATTACHMENT A 827
Agreement/Contract: City of Stockton
FY: 2022-2023
reimbursement. All invoices must reference this Agreement Number/Contract ID # and the service performed. Payments shall be made within 30 days of receipt of invoice from the CONTRACTOR.
LATE FEES: Government Code 926.10 “….any person having such a claim against a public agency, shall be entitled to interest commencing the 61st day after such public entity or person files a liquidated claim known or agreed to be valid when filed pursuant to such statute or contract, and such claim is due and payable. Interest shall be 6 percent per annum.”
E. CONTRACTOR’S Status:
In the performance of work, duties and obligations imposed by this Agreement, the CONTRACTOR is at all times acting as an Independent CONTRACTOR practicing his or her profession and not as an employee of the COUNTY. A copy of the CONTRACTOR’S current professional, local, state or other business licenses required to conduct the services stated herein, will be provided to the COUNTY.
F. Assignments:
Inasmuch as this Agreement is intended to secure the specialized services of CONTRACTOR, the CONTRACTOR may not assign, transfer, delegate or subcontract their obligation herein without the prior written consent of San Joaquin County. Any such assignment, transfer, delegation or subcontract without the prior written consent shall be considered null and void.
G. Non Exclusive Rights:
This Agreement does not grant to the CONTRACTOR any exclusive privileges or rights to provide services to the COUNTY. The CONTRACTOR may contract with other counties, private companies or individuals for similar services.
H. Indemnification:
The CONTRACTOR shall, at its expense, defend, indemnify and hold harmless the County of San Joaquin and its employees, officers, directors, contractors and agents from and against any losses, liabilities, damages, penalties, costs, fees, including without limitation reasonable attorneys’ fees, and expenses from any claim or action, including without limitation for bodily injury or death, to the extent caused by or arising from the active and/or passive negligence or willful misconduct of the CONTRACTOR, its employees, officers, agents or Subcontractors.
The CONTRACTOR shall hold the COUNTY, its officers and employees, harmless from liability, of any nature or kind on account of use of any copyrighted, or un-copyrighted composition, secret process, patented or un-patented invention articles or appliance furnished or used under this order.
ATTACHMENT A 828
Agreement/Contract: City of Stockton
FY: 2022-2023
I. Insurance
1. 1. The CONTRACTOR, shall submit proof of insurance with liability limits as set forth below to the Purchasing Department showing the COUNTY, its officers, employees, agents and volunteers named as Additional Insureds, to include ongoing operations and products completed operations (On Additional Insured Endorsement ISO CG 25 03 or ISO CG 25 04), except for Workers’ Compensation and professional Liabilities, and insurance policy shall contain provisions that such policy may not be canceled or reduced except after thirty (30) days written notice to the COUNTY. The COUNTY at its discretion, may waive in part or in full insurance requirements. The CONTRACTOR is required to provide insurance unless notified by the COUNTY’S Purchasing Agent of any waivers.
2. The CONTRACTOR agrees that the CONTRACTOR is responsible to ensure that the requirements set forth in this article/paragraph are also to be met by the CONTRACTOR’S subcontractors/CONTRACTOR’S who provide services pursuant to this Agreement. Copies of insurance certificates shall be filed with the COUNTY’S Purchasing Agent.
3. General Liability Limits
a. BI & PD combined/per occurrence/Aggregate $1,000,000.00 b. Personal Injury/Aggregate $1,000,000.00
c. Automobile Liability/per occurrence $1,000,000.00
1) The CONTRACTOR agrees to defend, hold harmless and indemnify the COUNTY for any and all liabilities associated with the use of any automobiles in relation to tasks associated with this Agreement.
4. Professional Liability
a. Professional Liability/as appropriately relates to $1,000,000.00 services rendered. Coverage may include medical
malpractice and/or errors and omissions.
5. Workers’ Compensation and Employer’s Liability Statutory requirement
6. Employment Practices Liability Insurance with limit of no less than $1,000,000.00 ATTACHMENT A 829
Agreement/Contract: City of Stockton
FY: 2022-2023
a. The County, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with such work or operations. Liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).
J. Discrimination:
The CONTRACTOR shall not discriminate because of because of race, color, religion, sex, gender, gender identity, gender expression, sexual orientation, marital status, national origin, ancestry, mental and physical disability, medical condition, genetic information, military or veteran status, age, pregnancy, denial of medical and family care leave, or pregnancy disability leave (Government Code sections 12940,12945, 12945.2). The Contractor shall not retaliate against any person for protesting illegal discrimination related to one of these categories, or for reporting patient abuse in tax supported institutions.
K. ADA Compliance:
The CONTRACTOR shall comply with the Americans with Disabilities Act (ADA) of 1990, which prohibits discrimination on the basis of disability, as well as all applicable regulations and guidelines issued pursuant to the ADA. (42 U.S.C. Sections 12101 et seq.)
L. Notices:
Any notice required to be given pursuant to the terms and conditions hereof shall be in writing, and shall be effected by one of the following methods: personal delivery, prepaid Certified First-Class Mail, or prepaid Priority Mail with delivery confirmation. Unless otherwise designated in writing by either party, such notice shall be mailed to the addresses shown on page one (1) of this Agreement.
M. Termination:
1. Termination for Cause: If the CONTRACTOR breaches or habitually neglects the CONTRACTOR’S duties under this Agreement without curing such breach or neglect upon fifteen (15) working days written notice, the COUNTY may, by written notice, immediately terminate this Agreement without prejudice to any other remedy to which the COUNTY may be entitled, either at law, in equity, or under this Agreement.
2. Termination for Convenience: In addition, either party may terminate this Agreement upon thirty (30) days written notice to other party.
3. Funding out Clause: If the County Board of Supervisors fails to appropriate funds to enable the County Departments to continue to make purchases under this Agreement, this Agreement will be cancelled immediately and the CONTRACTOR will be given written notice of such termination.
ATTACHMENT A 830
Agreement/Contract: City of Stockton
FY: 2022-2023
4. If this Agreement is terminated under paragraphs 1, 2 or 3 above, CONTRACTOR shall only be paid for any services completed and provided prior to notice of termination. In the event of termination under paragraph 1, 2 or 3 above, CONTRACTOR shall be paid an amount, which bears the same ratio to the total compensation authorized by the Agreement as the services actually performed bear to the total services of CONTRACTOR covered by this Agreement, less payments of compensation previously made. Except as stated above and except for any reasonable end-of-contract fees, CONTRACTOR shall have no other allowable charges under the terms and conditions of this contract.
5. CONTRACTOR shall not incur any expenses under this Agreement after notice of termination and shall cancel any outstanding expenses obligations to a third party [related hereto] that CONTRACTOR can legally cancel; COUNTY shall not be liable for any expenses incurred by CONTRACTOR subsequent to the notice of termination N. Conflict of Interest Statement:
The CONTRACTOR covenants that the CONTRACTOR, its officers, employees and their immediate family, presently have no interests, including, but not limited to, other projects or independent contracts, and shall not acquire any such interests, direct or indirect, which would conflict in any manner or degree with the performance of services required to be performed under this Agreement. The CONTRACTOR further covenants that in the performance of this Agreement no person having any such interests shall be employed or retained by the CONTRACTOR under this Agreement. The CONTRACTOR shall not hire COUNTY'S employees to perform any portion of the work or services provided for herein including secretarial, clerical and similar incidental services except upon the written approval of the COUNTY. Performance of services under this Agreement by associates or employees of the CONTRACTOR shall not relieve the CONTRACTOR from any responsibility under this Agreement.
O. Drug Free Workplace:
The CONTRACTOR shall comply with the provisions of Government Code Section 8350 et seq., otherwise known as the Drug-Free Workplace Act.
P. Force Majeure:
It is agreed that neither party shall be responsible for delays in delivery, acceptance of delivery, or failure to perform when such delay or failure is attributable to Acts of God, war, strikes, riots, lockouts, accidents, rules or regulations of any governmental agencies or other matters or conditions beyond the control of either the CONTRACTOR or the COUNTY.
Q. Compliance:
1. The CONTRACTOR shall comply with all federal, state and local laws, regulations and requirements necessary for the provision of contracted services. Furthermore, the CONTRACTOR shall comply with all laws applicable to wages and hours of employment, occupational safety, fire safety, health and sanitation. The CONTRACTOR ATTACHMENT A 831
Agreement/Contract: City of Stockton
FY: 2022-2023
shall maintain current throughout the life of this Agreement, all permits, licenses, certificates and insurances that are necessary for the provision of contracted services.
2. The CONTRACTOR shall comply with Assembly Bill 1522, known as the Healthy Workplaces, Healthy Families Act of 2014, codified at California Labor Code Section 245-249. With a few exceptions, the new law requires all employers to provide employees performing work in California with paid sick leave, beginning on July 1, 2015.
R. Governing Law and Venue:
The Laws of the State of California shall govern this Agreement. Venue is San Joaquin County. The provision of this paragraph shall survive expiration or other termination of this Agreement regardless of the cause of such termination.
S. Public Record (Section 9.11)
All bids become property of the COUNTY. All bids, including the accepted bid and any subsequent contract become public records per the requirements of the California Government Code, Sections 6250-6270, “California Public Records Act”. Proprietary material must be clearly marked as such. Pricing and service elements of the successful bid are not to consider proprietary information.
The COUNTY will treat all information submitted in a bid/proposal as available for public inspection once the COUNTY has a contract finalized with the selected contractor. If you believe that you have a legally justifiable basis under the California Public Records Act (Government Section 6250 et. seq.) for protecting the confidentiality of any information contained within your bid, you must identify any such information, together with the legal basis of your claim in your bid. The CONTRACTOR agrees to defend and indemnify the COUNTY for any liability, costs, and expenses incurred in asserting such confidentiality as part of your bid. The final determination as to whether the COUNTY will assert your claim of confidentiality on your behalf shall be sole discretion of the COUNTY.
T. Documents:
All drawings, specifications, documents and other memoranda or writings relating to the work and services hereunder, shall remain or become the property of the COUNTY whether executed by or for the CONTRACTOR for COUNTY, or otherwise by or for the CONTRACTOR, or by or for a subcontractor operating under the CONTRACTOR’S supervision, or direction, and all such documents and copies thereof shall be returned or transmitted to the COUNTY forthwith upon the COUNTY written demand, termination or completion of the work under this Agreement.
U. San Joaquin County Green Purchasing Policy:
1. San Joaquin County has a Green Purchasing Policy; please click on the link to view: http://www.sjgov.org/SupportServ/dynamic.aspx?id=10128
2. The COUNTY has adopted an Environmentally Preferable Purchasing (EPP) Policy. EPP refers to the procurement of goods and services that lessen or reduce negative effect on human health and the environment when compared ATTACHMENT A 832
Agreement/Contract: City of Stockton
FY: 2022-2023
with competing goods and services that serve the same purpose. This comparison takes into consideration such things as: raw materials acquisition; production; manufacturing; packaging; distribution; reuse; disposal; energy efficiency; performance; safety and cost.
3. A primary goal of this policy is to encourage contractors/suppliers and departments to consider products and services that help minimize environmental impacts with price, performance and aesthetic considerations being equal.
Contractors/suppliers are encouraged to offer products and services that meet legitimate “green” standards, e.g. products that possess independent third party certifications such as Energy Star, Green Seal, EcoLogo, EPEAT or FEMP (Federal Energy Management Program) standards. The County also encourages offers of products made with minimal virgin materials and maximum use of recycled materials – again, price and performance essentially being equal.
V. Work Product:
The COUNTY and the CONTRACTOR acknowledge and agree that “Work Product”, and all components of it, provided or developed by the CONTRACTOR hereunder or in connection herewith shall constitute “works made for hire” within the meaning of Title 17 United States Code Section 101 et seq. (the “Copyright Act”), and all right, title, and interest in and to the Custom Products shall vest in the COUNTY immediately upon development. To the extent any such Custom Products may not be the sole and exclusive property of the COUNTY and/or may not be a “work made for hire” as defined in the Copyright Act upon development, then the CONTRACTOR agrees to and hereby does sell, transfer, grant and assign to the COUNTY all copyrights, patents, trade secrets, inventions, and other proprietary rights, title, and interest in and to such Custom Products upon development. On all written material, whether in print, electronic, or any media form, constituting “Work Product”, the CONTRACTOR shall place or cause to be placed the following legend preferably in the lower right corner:
© 2019 County of San Joaquin. All rights reserved.
W. Data Security – Confidentiality
1. Acknowledgment of access to information characterized as covered data: The CONTRACTOR acknowledges that its contract/purchase order (“Agreement”) with the COUNTY of San Joaquin, California(“County”) may allow the CONTRACTOR access to confidential COUNTY information or the COUNTY provided information including, but not limited to, personal information, records, data, or financial information notwithstanding the manner in which or from whom it is received by the CONTRACTOR (“Covered Data”) which is subject to state laws that restrict the use and disclosure of the COUNTY information, including the California Information Practices Act (California Civil Code Section 1798 et seq.), California Constitution Article 1, Section 1, and other existing relative or future adopted State and/or Federal requirements. Contractor shall maintain the privacy of, and shall not release, Covered Data without full compliance with all applicable state and federal laws, the COUNTY policies, and the provisions of this Agreement.
The CONTRACTOR agrees that it will include all of the terms and conditions contained in this clause in all subcontractor or agency contracts providing services ATTACHMENT A 833
Agreement/Contract: City of Stockton
FY: 2022-2023
under this Agreement. Where a federal, state or local law, ordinance, rule or regulation is required to be made applicable to this Agreement, it shall be deemed to be incorporated herein without amendment to this Agreement.
2. Prohibition on unauthorized use or disclosure of covered data and information: The CONTRACTOR agrees to hold Covered Data received from or created on behalf of the COUNTY in strictest confidence. The CONTRACTOR shall not use or disclose Covered Data except as permitted or required by the Agreement or as otherwise authorized in writing by the COUNTY. If required by a court of competent jurisdiction or an administrative body to disclose Covered Data, CONTRACTOR will notify the COUNTY in writing prior to any disclosure in order to give the COUNTY an opportunity to oppose any such disclosure. Any work using, or transmission or storage of, Covered Data outside the United States is subject to prior written authorization by the COUNTY.
3. Safeguard standard: The CONTRACTOR agrees that it will protect the Covered Data according to commercially acceptable standards and no less rigorously than it protects its own confidential information, but in no case less than reasonable care. The CONTRACTOR shall develop, implement, maintain and use appropriate administrative, technical and physical security measures which may include but not be limited to encryption techniques, to preserve the confidentiality, integrity and availability of all such Covered Data.
4. Return or destruction of covered data and information: Upon termination, cancellation, expiration or other conclusion of the Agreement, the CONTRACTOR shall return the Covered Data to the COUNTY unless the COUNTY requests that such data be destroyed. This provision shall also apply to all Covered Data that is in the possession of subcontractors or agents of the CONTRACTOR. The CONTRACTOR shall complete such return or destruction not less than thirty (30) calendar days after the conclusion of this Agreement. Within this thirty (30) day period, the CONTRACTOR shall certify in writing to the COUNTY that the return or destruction has been completed.
5. Reporting of unauthorized disclosures or misuse of covered data and information: The CONTRACTOR shall report, either orally or in writing, to the COUNTY any use or disclosure of Covered Data not authorized by this Agreement or in writing by the COUNTY, including any reasonable belief that an unauthorized individual has accessed Covered Data. The CONTRACTOR shall make the report to the COUNTY immediately upon discovery of the unauthorized disclosure, but in no event more than two (2) business days after the CONTRACTOR reasonably believes there has been unauthorized use or disclosure. The CONTRACTOR’S report shall identify: (i) the nature of the unauthorized use or disclosure, (ii) the COUNTY Covered Data used or disclosed, (iii) who made the unauthorized use or received the unauthorized disclosure, (iv) what the CONTRACTOR has done or shall do to mitigate any deleterious effect of the unauthorized use or disclosure, and (v) what corrective action the CONTRACTOR has taken or shall take to prevent future similar unauthorized use or disclosure. The CONTRACTOR shall provide the COUNTY other information, including a written report, as reasonably requested by the COUNTY.
ATTACHMENT A 834
Agreement/Contract: City of Stockton
FY: 2022-2023
6. Examination of records: The COUNTY and, if the applicable contract or grant so provides, the other contracting party or grantor (and if that be the United States, or an agency or instrumentality thereof, then the Controller General of the United States) shall have access to and the right to examine any pertinent books, documents, papers, and records of the CONTRACTOR involving transactions and work related to this Agreement until the expiration of five years after final payment hereunder. The CONTRACTOR shall retain project records for a period of five years from the date of final payment.
7. Assistance in litigation or administrative proceedings: The CONTRACTOR shall make itself and any employees, subcontractors, or agents assisting the CONTRACTOR in the performance of its obligations under the Agreement available to the COUNTY at no cost to the COUNTY to testify as witnesses, or otherwise, in the event of litigation or administrative proceedings against the COUNTY, its directors, officers, agents or employees based upon a claimed violation of laws relating to security and privacy and arising out of this Agreement.
8. No third-party rights: Nothing in this Agreement is intended to make any person or entity who is not signatory to the Agreement a third-party beneficiary of any right created by this Agreement or by operation of law.
9. Survival: The terms and conditions set forth shall survive termination of the Agreement between the parties.
X. Attorney’s Fees:
In any action brought by a party to enforce the terms of this Agreement, the prevailing party shall be entitled to reasonable attorney's fees and costs, including the reasonable value of any services provided by in-house counsel. The reasonable value of services provided by in-house counsel shall be calculated by applying an hourly rate commensurate with prevailing market rates charged by attorneys in private practice for such services.
Y. Entire Agreement and Modification:
This Agreement and all documents incorporated by reference supersedes all previous Agreements either oral or in writing and constitutes the entire understanding of the parties hereto. No changes, amendments or alterations shall be effective unless in writing and signed by both parties.
[THIS SPACE LEFT INTENTIONALLY BLANK]
ATTACHMENT A 835
VI. EXECUTING PARTIES
A. IN WITNESS WHEREOF, COUNTY and CONTRACTOR have executed this Agreement effective on the day and year first written above.
CITY OF STOCKTON, a municipal
Corporation
425 N. El Dorado St. Stockton, CA
95202
By:------------
Harry Black, City Manager
"CONTRACTOR"
APPROVED AS TO FORM
By:----------
Print Name
Position: ----------
By:----------
Signed Name
Agreement/Contract: City of Stockton
COUNTY OF SAN JOAQUIN, a political
Subdivision of the State of California
By:---------------
Chairman, Charles Winn
Board of Supervisors
San Joaquin County,
State of California
"COUNTY"
ATTEST: Rachel DeBord
Clerk of the Board of Supervisors
of the County of San Joaquin,
State of California
By:------------
Date: -------------
ORM
el \\
By:
Richard
-�---J. Sor -llo, ------- �
Deputy County Counsel
FY: 2022-2023
ATTACHMENT A 836
Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION APPROVING THE INDEPENDENT CONTRACTOR AGREEMENT
BETWEEN SAN JOAQUIN COUNTY AND CITY OF STOCKTON IN THE AMOUNT OF $1,356,782, FOR CALIFORNIA ASSEMBLY BILL 109 (AB 109) FUNDING OF
THE COMMUNITY CORRECTIONS PARTNERSHIP TASK FORCE, AND THE AMENDMENT OF THE FISCAL YEAR 2022-23 ANNUAL BUDGET
The Community Corrections Partnership (CCP) of San Joaquin County formed a Task Force in 2012 to support the premise of prison realignment; and The Task Force uses the Problem Oriented Policing (POP) model focusing on offenders who are wanted for a new crime or compliance violation, have a history of violence, are repeat offenders or are at high risk of becoming repeat offenders; and The Task Force serves each of the cities within San Joaquin County based on identified need; and
Since 2012, funding allocated through AB 109 to San Joaquin County has been applied for and awarded to support the core team members of the Task Force; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The Independent Contractor Agreement between San Joaquin County and the City of Stockton, for AB 109 funding of the CCP Task Force, is hereby approved.
2. The City Manager, as Fiscal Agent for the law enforcement agencies of San Joaquin County, is authorized to accept $1,356,782 in Fiscal Year 2022-23 Police Grant Funds.
3. The Fiscal Year 2022-23 Annual Budget is amended to appropriate $1,356,782 in revenues and expenditures for the Police Grants and Special Programs CCP Task Force accounts as needed to carry out the purpose and intent of this action. //
//
//
//
//
//
837
4. The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED July 12, 2022 .
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
838
City of Stockton
Legislation Text
File #: 22-0403, Version: 1
APPROVE MOTION TO AWARD A PROFESSIONAL SERVICES CONTRACT FOR THE AIRPORT
WAY BRIDGE OVER MORMON SLOUGH FIRE REPAIR PROJECT
RECOMMENDATION
It is recommended that the City Council approve a motion to:
1. Award a Professional Services Contract to Siegfried Engineering, Inc. of Stockton, CA, in the amount of $144,000, for the Airport Way Bridge Over Mormon Slough Fire Repair, Project No.
WT19009.
2. Approve findings pursuant to Stockton Municipal Code section 3.68.070 in support of an exception to the competitive bidding process.
It is also recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this motion.
Summary
In 2018 and 2021, fires were sustained under the Airport Way Bridge over Mormon Slough due to vandalism from homeless encampments (Attachment A). Future maintenance repairs are required due to damage sustained to the abutments and concrete bridge deck. The Airport Way Bridge Over Mormon Slough Fire Repair project will include concrete repairs, reconstruction of the embankment fill, and installation of concrete slope paving and river rock under the bridge. The project was included in the 2021-26 Five-Year Capital Improvement Plan (CIP).
On December 16, 2021, the City advertised a Request for Proposals (RFP) for design of the Airport Way Bridge Over Mormon Slough project. On January 13, 2022, one firm submitted a proposal for this project. Staff was unable to negotiate a reasonable fee for design services with the consultant.
On January 25, 2022, the City readvertised the RFP, and three firms submitted proposals for this project. The Selection Committee evaluated the proposals and found Siegfried Engineering, Inc. of Stockton, CA, to be the most qualified and highest ranked firm.
It is recommended that Council approve a motion authorizing the City Manager to execute a Professional Services Contract in the amount of $144,000 to Siegfried Engineering, Inc. It is anticipated that the design will be completed by April 2023. The project will then be advertised for construction bids, with overall project completion anticipated by June 2024.
City of Stockton Page 1 of 3 Printed on 7/5/2022
powered by Legistar™
839
File #: 22-0403, Version: 1
DISCUSSION
Background
In 2018 and 2021, fires were sustained under the Airport Way Bridge over Mormon Slough due to vandalism from homeless encampments (Attachment A). Structural engineers have completed evaluations of the bridge and determined the structural integrity of the bridge is satisfactory for normal use and operation; however, future maintenance repairs are required.
Repairs are needed to the bridge’s abutments and concrete deck. Restoration is also needed for the embankment that has been excavated by unsheltered individuals. The Airport Way Bridge Over Mormon Slough Fire Repair project will include concrete repairs, reconstruction of the embankment fill, and installation of concrete slope paving and river rock under the bridge. Installation of concrete slope paving at the abutments and river rock at the channel bottom is intended to prevent future vandalism to the abutments and other structural components of the bridge.
Present Situation
On December 16, 2021, the City advertised an RFP for design of the Airport Way Bridge Over Mormon Slough, Project No. WT19009. On January 13, 2022, one proposal was received for this project. Staff was unable to negotiate a reasonable fee for design services with the consultant.
On January 25, 2022, the City readvertised the RFP for design of the Airport Way Bridge Over Mormon Slough, Project No. WT19009. On February 23, 2022, three proposals were received from the following engineering firms:
· Siegfried Engineering, Inc. (Stockton, CA)
· ADKO (Roseville, CA)
· Mark Thomas (Sacramento, CA)
A Selection Committee comprised of Public Works’ staff evaluated and ranked all proposals based on each firm’s understanding of work, experience with similar kinds of work, qualifications of the proposed team, project approach, cost, and local preference.
Siegfried Engineering, Inc. received the highest ranking, based on the noted criteria, and was determined to be the most qualified firm for this project. Staff negotiated a fee in the amount of $144,000 with Siegfried Engineering, Inc. for design services. The negotiated fee is approximately 18 percent of the total estimated construction cost, which is higher than typical, but reasonable considering the anticipated environmental permitting required by the Central Valley Flood Protection Board, California Department of Fish and Wildlife, and Central Valley Regional Water Quality Control Board. For additional perspective, Siegfried’s fee is approximately 70% of the cost proposed by the previous firm that staff attempted to negotiate with during the first RFP procurement process.
Staff recommends that Council approve a motion to award a Professional Services Contract in the amount of $144,000 to Siegfried Engineering, Inc. for design services of the Airport Way Bridge Over Mormon Slough Fire Repair project (Attachment B). It is anticipated that the design and permitting City of Stockton Page 2 of 3 Printed on 7/5/2022
powered by Legistar™
840
File #: 22-0403, Version: 1
will be completed by April 2023. The project will then be advertised for construction bids, with overall project completion anticipated by June 2024.
Findings
Pursuant to Stockton Municipal Code (SMC) section 3.68.070, Council may approve findings which support an exception to the competitive bidding process. These findings include:
1. The City does not have enough staffing available to design this project for bidding and construction in 2023.
2. The scope of the design services requires an engineering firm experienced in bridge design rehabilitation.
3. Use of the RFP process is appropriate for this Professional Services Contract because it relies on the evaluation of professional qualifications and performance as the basis for selection of a vendor. Use of this criteria helps ensure selection of a vendor that will provide the highest quality professional service, which is in the public interest.
4. The City negotiated a contract following solicitation of competitive proposals in accordance with SMC section 3.68.070.A.3.
FINANCIAL SUMMARY
There is sufficient funding in the Airport Way Bridge Over Mormon Slough Fire Repair, Project No.
WT19009, to award a Professional Services Contract in the amount of $144,000 to Siegfried Engineering, Inc. for the project.
There is no impact to the City’s General Fund or any other unrestricted fund as a result of taking the recommended action.
Attachment A - Vicinity Map
Attachment B - Professional Services Contract with Siegfried Engineering, Inc.
City of Stockton Page 3 of 3 Printed on 7/5/2022
powered by Legistar™
841
842
Professional Services Contract – SIEGFRIED ENGINEERING, INC – WT19009 (Updated 02/28/18)
PROFESSIONAL SERVICES CONTRACT
THIS CONTRACT is entered into this day of 2022,
between the CITY OF STOCKTON, a municipal corporation (“City”), and SIEGFRIED ENGINEERING, INC. whose address is 3428 BROOKSIDE ROAD, STOCKTON, CA 95219 (“Consultant”) for the AIRPORT WAY BRIDGE OVER MORMON SLOUGH FIRE REPAIR, PROJECT NO. WT19009, hereinafter referred to as "Project".
RECITALS
A. Consultant represents that it is licensed in the State of California and is qualified to provide the services proposed in the SCOPE OF WORK section of this Contract.
B. City finds it necessary and advisable to use the services of the Consultant for the purposes provided in this Contract.
NOW THEREFORE, in consideration of the mutual promises, covenants, and conditions in this Contract, City and Consultant agree as follows:
1. SCOPE OF SERVICES. Subject to the terms and conditions set forth in this Contract, Consultant shall undertake and complete the services described in Exhibit A. Consultant shall provide said services at the time, place, and in the manner specified in Exhibit A and compatible with the standards of the profession. Consultant agrees that it shall produce a fully complete project that is acceptable to the City.
2. COMPENSATION. City shall pay Consultant for services outlined in Exhibit A according to the fee not to exceed the schedule detailed in Exhibit C, which is attached to this Contract and incorporated by this reference. Consultant agrees this fee is for full remuneration for performing all services and furnishing all staffing and materials called for in the scope of services. The payments shall be made on a monthly basis upon receipt and approval of Consultant’s invoice. Total compensation for services and reimbursement for costs shall not exceed $144,000.00 or as otherwise mutually agreed to in a Contract Amendment.
3. INSURANCE. During the term of this Contract, Consultant shall maintain in full force and effect at its own cost and expense the insurance coverage as set forth in the attached Exhibit D and shall otherwise comply with the other provisions of Exhibit D.
4. INDEMNITY AND HOLD HARMLESS. With the exception that this section shall in no event be construed to require indemnification by Consultant to a greater extent than permitted under the public policy of the State of California, Consultant shall indemnify, and hold harmless City, its Mayor, Council, officials, and employees from and against any and all claims and causes of action which result in liabilities, judgments, awards, losses, damages, expenses, and costs (including reasonable attorneys’ fees, expert and consultant fees, and other expenses of litigation) including, but not limited to,
Professional Services Contract – SIEGFRIED ENGINEERING, INC – WT19009 (Updated 02/28/18)
death or injury to persons, or damage to property, which arise out of any violation of federal, state, or municipal law or ordinance, to the extent damages are caused by the Consultant’s negligent services provided under this Agreement, or are in any way caused by the negligent performance of work by the Consultant or Consultant’s officers, agents, employees, or subcontractors. Consultant shall not be obligated to indemnify or defend City for claims finally determined by a court of law or arbitrator to arise from the negligence or willful misconduct of the City. It is the intent of the Parties that this indemnity obligation is at least as broad as is permitted under California law. To the extent California Civil Code sections 2782, et seq., limit the defense or indemnity obligations of Consultant to City, the intent hereunder is to provide the maximum defense and indemnity obligations allowed by Consultant under the law. The indemnity set forth in this section shall not be limited by insurance requirements or by any other provision of this Agreement.
With the exception that this section shall in no event be construed to require indemnification by Consultant to a greater extent than permitted under the public policy of the State of California, and in addition to the other indemnity obligations in this Agreement, Consultant shall indemnify, defend, and hold harmless City, its Mayor, Council, officials, representatives, and employees from and against claims, losses, expenses, and costs including, but not limited to, reasonable attorneys’ fees, arising out of any claim brought against the City by an employee of Consultant, regardless of whether such claim may be covered by any applicable workers compensation insurance.
Consultant’s indemnification obligation is not limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Consultant under workers’ compensation acts, disability acts, or other employee benefit acts.
5. SCHEDULE AND TERM. Consultant shall perform the scope of work as described in Exhibit A according to the schedule detailed in Exhibit B, which is attached to this Contract and incorporated by this reference. This Contract shall commence on the date written above and shall expire on DECEMBER 31, 2024, unless extended by mutual agreement through the issuance of a Contract Amendment. a. Invoices submitted by Consultant to City must contain a brief description of work performed, time used, and include the City project number. Payment shall be made within thirty (30) days of approval of invoice by City. b. Upon completion of work and acceptance by City, Consultant shall have sixty (60) days in which to submit final invoicing for payment. An extension may be granted by City upon receiving a written request thirty (30) days in advance of said time limitation. City shall have no obligation or liability to pay any invoice for work performed which Consultant fails or neglects to submit within sixty (60) days, or any extension thereof granted by the City, after work is accepted by City.
6. CONFORMANCE TO APPLICABLE LAWS. Consultant shall comply with all applicable federal, State, and Municipal laws, rules, and ordinances. Consultant shall not discriminate in the employment of persons or in the provision of services under this Contract on the basis of any legally protected classification, including race, color, national origin, ancestry, sex or religion of such person.
Professional Services Contract – SIEGFRIED ENGINEERING, INC – WT19009 (Updated 02/28/18)
a. TITLE VI
Title VI of the Civil Rights Act of 1964 requires that “no person in the United States shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance.” (42 USC Section 2000d).
http://www.dol.gov/oasam/regs/statutes/titlevi.htm.
The City of Stockton requires compliance with the requirements of Title VI in all of its programs and activities regardless of funding source. b. DISCRIMINATION AND HARASSMENT POLICY
The City of Stockton has a Discrimination and Harassment Policy (Exhibit E). The purpose of this policy is to reaffirm the City’s commitment to demonstrating respect for all individuals by strictly prohibiting discrimination and harassment, including sexual harassment in the workplace, to define the types of behavior and conduct prohibited by this policy, and to set forth a procedure for reporting, investigating, and resolving complaints of discrimination and harassment in the workplace. c. LABOR STANDARDS PROVISIONS/CALIFORNIA LABOR CODE
The bidder shall understand that conditions set forth in Chapter 1, Part 7, Division 2 of the California Labor Code shall be considered part of the contract agreement.
https://leginfo.legislature.ca.gov/faces/codes_displayText.xhtml?lawCode= LAB&division=2.&title=&part=7.&chapter=1.&article=2.
d. PREVAILING WAGE RATES
Consultant and any subcontractor shall pay each employee engaged in the trade or occupation not less than the prevailing hourly wage rate. In accordance with the provisions of Section 1770 of the Labor Code, the Director of Department of Industrial Relations of the State of California has determined the general prevailing rates of wages and employer payments for health and welfare, pension, vacation, travel time, and subsistence pay as provided for in Section 1773.1, apprenticeship or other training programs authorized by Section 3093 and similar purposes applicable to the work to be done. Consultant performing the work under this contract shall obtain a copy of the wage rate determination and shall distribute copies to each subcontractor. As the wage determination for each craft reflects an expiration date, it shall be the prime Consultant and each subcontractor's responsibility to ensure that the prevailing wage rates of concern is current and paid to the employee.
Professional Services Contract – SIEGFRIED ENGINEERING, INC – WT19009 (Updated 02/28/18)
i. The Consultant performing the work shall be responsible for obtaining a copy of the State wage rate determination. State wage rates may be obtained at:
http://www.dir.ca.gov/OPRL/pwd/Determinations/Northern/Northern.pdf.
The Consultant shall be responsible for posting said wage rates at a prominent location at the work site and shall maintain same in a good readable condition for the duration of the work.
ii. Should the Consultant choose to work on a Saturday, Sunday or on a holiday recognized by the Labor Unions, the Consultant shall reimburse the City the actual cost of engineering, inspection, superintendence, and or other overhead expenses which are directly chargeable to the contract. Should such work be undertaken at the request of the City, reimbursement will not be required. To conform strictly with the provisions of Division 2, Part 7, Chapter 1, Article 2, of the Labor Code of the State of California. To forfeit as a penalty to City the sum of TWENTY-FIVE AND NO/100 DOLLARS ($25.00) for each laborer, worker, or mechanic employed by CONTRACTOR, or by any subcontractor under Consultant, in the execution of this contract, for each calendar day during which any laborer, worker, or mechanic is required or permitted to work more than eight (8) hours and who is not paid the general prevailing rate of per diem wages for holiday and overtime work in violation of the provisions of Sections 1770 to 1781 of the Labor Code of the State of California. That all sums forfeited under the provisions of the foregoing sections shall be deducted from the payments to be made under the terms of this contract. iii. PAYROLL RECORDS - The Consultant to whom the contract is awarded shall ensure that the prime and each subcontractor will, in accordance with Section 1776 of the Labor Code, maintain certified payroll records. A copy of said records shall be provided with each invoice to the Public Works Department, Attention: Contract Compliance Officer. It shall be the Consultant’s responsibility to obtain copies of the current prevailing wage rate determination for all subcontractors. Additionally, certified payroll records must be uploaded to the DIR website as required by labor code.
iv. APPRENTICESHIP STANDARDS - The Consultant shall comply with the provisions established in Section 1777.5 of the Labor Code concerning the 1) certified approval by local joint apprenticeship committees for the employment and training of apprentices, and 2) contribution of funds to administer and conduct apprenticeship programs, if applicable to the job.
7. RIGHTS AND DUTIES OF CITY. City shall make available to Consultant all data and information in the possession of City which both parties deem necessary to
Professional Services Contract – SIEGFRIED ENGINEERING, INC – WT19009 (Updated 02/28/18)
complete the work, and City shall actively aid and assist Consultant in obtaining such information as may be deemed necessary from other agencies and individuals.
8. OBLIGATIONS OF CONSULTANT. Throughout the term of this Contract, Consultant represents and warrants that it has or will have at the time this Contract is executed, all licenses, permits, qualifications, insurance, and approvals of whatsoever nature which are legally required for the Consultant to practice its professions, and Consultant shall, at its own cost and expense, keep in effect during the life of this Contract all such licenses, permits, qualifications, insurance, and approvals. Consultant shall meet with the Public Works Director or other personnel of City or third parties as necessary on all matters connected with the carrying out of Consultant’s services. Such meetings shall be held at the request of either party hereto. Consultant further warrants that it will follow the best current, generally accepted and professional practices to make findings, render opinions, prepare factual presentations, and provide professional advice and recommendations regarding this project.
9. OWNERSHIP OF WORK. All reports, drawings, designs, plan review comments, work product, and all other documents completed or partially completed by Consultant in the performance of this Contract shall become and remain the property of the City. Any and all copyrightable subject matter in all materials is hereby assigned to the City and the Consultant agrees to execute any additional documents that may be necessary to evidence such assignment. All materials shall be delivered to the City upon completion or termination of the work under this Contract. If any materials are lost, damaged, or destroyed before final delivery to the City, the Consultant shall replace them at its own expense. Consultant shall keep materials confidential. Materials shall not be used for purposes other than performance of services under this Contract and shall not be disclosed to anyone not connected with these services unless the City expressly provides prior written consent.
10. CONTRACT AMENDMENTS. City reserves the right to make such alterations as may be deemed necessary or advisable and to require such extra work as may be required for the proper completion of the work contemplated by Consultant. Any such changes will be set forth in a Contract Amendment which will specify, in addition to the work done in connection with the change made, adjustment of contract time, if any, and the basis of compensation for such work. A Contract Amendment will not become effective until approved by the authorized City official.
11. TERMINATION. The City may terminate this Contract at any time by mailing a notice in writing to Consultant. The Contract shall then be deemed terminated and no further work shall be performed by Consultant. If the Contract is so terminated, the Consultant shall be paid for that percentage of work actually completed at the time the notice of termination is received.
12. CONSULTANT STATUS. In performing the obligations set forth in this Contract, Consultant shall have the status of an independent contractor and Consultant shall not be considered to be an employee of the City for any purpose. All persons working for or under the direction of Consultant are its agents and employees, and are not agents of the City. Subcontractors shall not be recognized as having any direct or
Professional Services Contract – SIEGFRIED ENGINEERING, INC – WT19009 (Updated 02/28/18)
contractual relationship with the City. The persons engaged in the work, including employees of subcontractors and suppliers, will be considered employees of Consultant.
The Consultant shall be responsible for the work of subcontractors, which shall be subject to the provisions of this Contract. The Consultant is responsible to the City for the acts and omissions of its subcontractors and persons directly or indirectly employed by them. a. If in the performance of this Contract any third persons are employed by Consultant, such persons shall be entirely and exclusively under the direction, supervision, and control of Consultant. All terms of employment including hours, wages, working conditions, discipline, hiring, and discharging or any other term of employment or requirement of law shall be determined by Consultant.
i. It is further understood and agreed that Consultant must issue W-2 forms or other forms as required by law for income and employment tax purposes for all of Consultant’s personnel.
ii. As an independent contractor, Consultant hereby indemnifies and holds City harmless from any and all claims that may be made against the City based upon any contention by any third party that employer-employee relationship exists by reason of this Contract.
13. ASSIGNMENT. Consultant shall not assign, sublet, or transfer this Contract or any interest or obligation in the Contract without the prior written consent of the City, and then only upon such terms and conditions as City may set forth in writing. Consultant shall be solely responsible for reimbursing subcontractors.
14. HEADINGS NOT CONTROLLING. Headings used in the Contract are for reference purposes only and shall not be considered in construing this Contract.
15. NOTICES. Any and all notices herein required shall be in writing and shall be sent by certified or registered mail, postage prepaid, addressed as follows:
To Consultant: To City:
Siegfried Engineering, Inc. Public Works Director
3428 Brookside Road City of Stockton
Stockton, CA 95219 22 E. Weber Ave., Rm. 301
Stockton, CA 95202
16. LICENSES, CERTIFICATIONS, AND PERMITS. Prior to the City’s execution of this Contract and prior to the Consultant’s engaging in any operation or activity set forth in this Contract, Consultant shall obtain a City of Stockton business license, which must be kept in effect during the term of this Contract. Consultant covenants that it has obtained all certificates, licenses, permits and the like required to perform the services under this Contract.
17. RECORDS AND AUDITS. City reserves the right to periodically audit all charges made by Consultant to City for services under this Contract. Upon request,
Professional Services Contract – SIEGFRIED ENGINEERING, INC – WT19009 (Updated 02/28/18)
Consultant agrees to furnish City, or a designated representative, with necessary information and assistance.
Consultant agrees that City or its delegate shall have the right to review, obtain, and copy all records pertaining to performance of the Contract. Consultant agrees to provide City or its delegate with any relevant information requested and shall permit City or its delegate access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purposes of determining compliance with this Contract. Consultant agrees to maintain such records for a period of three years from the date that final payment is made.
18. CONFIDENTIALITY. Consultant shall exercise reasonable precautions to prevent the unauthorized disclosure and use of City reports, information or conclusions.
19. CONFLICTS OF INTEREST. Consultant covenants that other than this Contract, Consultant has no financial interest with any official, employee, or other representative of the City. Consultant and its principals do not have any financial interest in real property, sources of income or investment that would be affected in any manner or degree by the performance of Consultant’s services under this Contract. If such an interest arises, Consultant will immediately notify City.
20. WAIVER. In the event either City or Consultant at any time waive any breach of this Contract by the other, such waiver shall not constitute a waiver of any other or succeeding breach of this Contract, whether of the same or of any other covenant, condition, or obligation.
21. GOVERNING LAW. California law shall govern any legal action pursuant to this Agreement with venue for all claims in the Superior Court of the County of San Joaquin, Stockton Branch or, where applicable, in the federal District Court of California, Eastern District, Sacramento Division.
22. NO PERSONAL LIABILITY. No official or employee of City shall be personally liable to Consultant in the event of any default or breach by City or for any amount due Consultant.
23. INTEGRATION AND MODIFICATION. The response by Consultant to the Request for Proposals and the Request for Proposals on file with the City Clerk are hereby incorporated herein by reference to the extent that such documents do not differ from the provisions and terms of this Contract that shall supersede such response to Request for Proposals. This Contract represents the entire integrated agreement between Consultant and City, supersedes all prior negotiations, representations, or agreements, either written or oral, between the parties, and may be amended only by written instrument signed by Consultant and City. All exhibits and this contract are intended to be construed as a single document. Should any inconsistency occur between the specific terms of this Contract and the attached exhibits, the terms of this Contract will prevail.
Professional Services Contract – SIEGFRIED ENGINEERING, INC – WT19009 (Updated 02/28/18)
24. SEVERABILITY. The provisions of this Contract are severable to the extent that should any of its provisions or terms be declared void in whole or in part by operation of law or agreement of the parties, the remainder of the provisions or terms not expressly declared void shall remain enforceable and in full effect.
25. THIRD PARTY RIGHTS. Nothing in this Contract shall be construed to give any rights or benefits to anyone other than City and Consultant.
26. AUTHORITY. The undersigned hereby represent and warrant that they are authorized by the parties to execute this Contract.
IN WITNESS WHEREOF: the parties have executed this Contract the day and year first hereinabove written.
CITY OF STOCKTON SIEGFRIED ENGINEERING, INC.
By: By:
HARRY BLACK Signature
CITY MANAGER
ATTEST:
Print Name
BY:
ELIZA R. GARZA, CMC Title:
CITY CLERK
APPROVED AS TO FORM:
BY:
CITY ATTORNEY
Paul Schneider President
SCOPE OF WORK FOR AIRPORT WAY BRIDGE OVER MORMON SLOUGH FIRE REPAIR, CITY PROJECT NO. WT19009 TASK 1: BACKGROUND RESEARCH
Siegfried will inspect the bridge and conduct field review prior to submitting the proposal. Siegfried will research and review Caltrans Bridge Inspection Reports, topographic mapping, photos, right of way maps, “as-built” plans, record maps, surveys, and other geometrical and operational characteristics for the project.
TASK 2: ENVIRONMENTAL SERVICES
Siegfried will determine the environmental requirements that apply to this project and obtain necessary permits. Siegfried understands that this is a locally funded project so CEQA will be required, and that the City will be responsible for paying all fees associated with environmental permitting.
Task 2.1.1 Project Initiation
Siegfried will meet with the project team to review the key project issues, collect additional background information, such as preliminary engineering reports, figures, maps/plans, etc., confirm communication protocols, etc. As part of project initiation, the Siegfried team will provide input on the environmental elements of the project schedule.
Task 2.1.1 Deliverables:
ESA attendance at one virtual project initiation meeting Environmental elements of project schedule
TASK 2.1.2: ENVIRONMENTAL PROJECT DESCRIPTION
Siegfried, in close coordination with the project team, will prepare the environmental project description (PD). environmental PD will include project objectives, project location, proposed schedule, applicable engineering design information, and other relevant information. Figures/graphics will be developed using electronic files from existing information from the project team to identify the project area.
Task 2.1.2 Deliverables:
Environmental Project Description
TASK 2.1.3: CEQA DOCUMENTATION
Siegfried will review the project for application of a CEQA Categorical Exemption (CE). To support issuance of the CE, Siegfried will prepare a CE Support Memo that describes why a CE is the appropriate level of documentation for the project, documents the investigations completed during the review, and includes statements confirming absence of exceptions to the categorical exemption.
To inform the CE Support Memo, Seigfried will review the EnviroStor database maintained by the Department of Toxic Substances Control (DTSC) to confirm absence of known contamination or sites in the project area.
To confirm absence of known cultural and historic resources in the project area, Siegfried will complete background research at the California Historical Resources Information System Central California Information Center (CCIC).
The CE Support Memo will be provided to the City for inclusion in the project files.
Upon completion of environmental review, Siegfried will prepare a Notice of Exemption (NOE) in the City’s preferred format and provide it to the City for their signature and posting at the County Clerk-Recorder’s office.
Task 2.2.3 Deliverables:
Categorical Exemption Support Memo
Notice of Exemption
EXHIBIT A Page 9 of 32 ATTACHMENT B 851
TASK 2.1.4: REGULATORY PERMITTING
The City has received a June 24, 2020 letter from the U.S. Army Corps of Engineers (USACE) confirming that the site does not contain Waters of the U.S. It is assumed that this letter is still valid and therefore a Nationwide 404 permit from USACE is not needed. Despite this finding from the USACE, permit approvals may still be needed from the California Department of Fish and Wildlife (CDFW) and/or the Regional Water Quality Control Board (RWQCB). ESA will utilize the April 2020 Approved Jurisdictional Delineation report and coordinate with CDFW and RWQCB on their potential jurisdiction and need for approvals.
The City may need to obtain a Encroachment Permit from the Central Valley Flood Protection Board (CVFPB). ESA will prepare the base application form (Form 3615) and environmental questionnaire (Form 3615a) for submittal to the CVFPB.
The following outlines the detailed regulatory permitting scope of work:
Agency Coordination and Permit Verification
ESA will utilize the April 2020 Approved Jurisdictional Delineation report and coordinate with CDFW and RWQCB on their potential jurisdiction and need for approvals. If it is determined that approvals are needed from these agencies ESA will prepare applications for acquisition of permits, as appropriate.
Lake and Streambed Alteration Agreement:
A Lake or Streambed Alteration Agreement (LSAA) may be needed for work within the top of bank of Mormon Slough. ESA will prepare the necessary documentation to apply for an LSAA for the project.
To request an LSAA, project information must be uploaded to CDFW’s Environmental Permit Information Management System (EPIMS) Permitting Portal. The LSAA Notification will include supplemental information on the proposed project, including the project description; a description of existing vegetation communities; special status species with potential to occur at the project site; impacts on Fish & Game Code 1600, et seq. resources including streams, vegetation, fish, and wildlife; and measures to avoid and minimize project impacts. Maps and figures will be developed to support the permit.
Because the application materials must be uploaded to the EPIMS portal, ESA will develop the draft application materials in a separate Word file for City’s review and will revise the information once (i.e., finalize) based on one set of consolidated comments before uploading it to the EPIMS portal. The City, as the project applicant, will register on the EPIMS Permitting Portal, fill out the General Information section of the application, request ESA be associated with the permit application, and pay the associated notification fee. ESA will provide up to four hours to assist the City with the EPIMS registration and payment. ESA will submit the notification on City’s behalf.
RWQCB WDR Application:
Impacts to Waters of the State (WOTS) will require a Waste Discharge Report (WDR) from the RWQCB. ESA will prepare a WDR application package for submittal to RWQCB
The application will follow the Implementation Guidance for the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State (Wetland Procedures; April 2020). The application form will be completed and submitted along with supplemental information on the proposed project, including the project description, potential project impacts, impact avoidance and minimization measures that will be implemented (including restoration/revegetation efforts), and a cover letter. Maps and figures will be utilized/developed to support the permit application package.
CVFPB Encroachment Application:
ESA will prepare the base application form (Form 3615) and environmental questionnaire (Form 3615a) for submittal to the CVFPB. Siegfried will prepare a basic hydraulic cross section calculation to illustrate that the theoretical flow capacity is not significantly impacted by the improvements. It is assumed that the rock places at the channel bottom will be installed below the current flow line and not decrease the cross-sectional area of the channel. Any additional engineering or hydraulic studies or documents requested by CVFPB are excluded.
Task 2.2.4 Deliverables:
CDFW LSAA Notification
CVFPB Encroachment Application
EXHIBIT A Page 10 of 32 ATTACHMENT B 852
RWQCB Water Quality Certification or Waste Discharge Requirement Application, if necessary TASK 3: PLANS, SPECIFICATIONS, AND ESTIMATE
Siegfried will prepare complete PS&E documents, which include design improvement plans, traffic control plans, specifications, and an engineer’s estimate. PS&E shall be prepared according to current Caltrans Standard Plans and Specifications, City’s Standards and CA MUTCD, as appropriate.
Siegfried will prepare a base map showing existing information to facilitate the design of all the necessary improvements using the City’s latest Benchmark information. The base map limits shall be sufficient to cover all necessary improvements within the project areas.
Siegfried will provide an electronic submittal containing one (1) full size (24”x36”) set of plans (PDF), two (2) copies of specifications (Word and PDF), and two (2) copies of the engineer’s estimate (Excel and PDF) at the 65%, 95% and 100% phases to the Engineer for review. Prior to this, Siegfried will provide a 30% conceptual plan for City review. Siegfried will prepare a comment response matrix and submit to the City following each submittal stage. Siegfried will provide electronic copies of the plans after the 100% phase comments have been incorporated for final review prior to plotting on mylars.
Siegfried will be responsible for the final submittal which incorporates all previous review comments, technical requirements, right-of-way information, utility verification/protection, minimum contractor qualifications, regulatory agency permits and mitigation monitoring requirements, any applicable encroachment permit requirements, and City requirements.
Siegfried will provide the necessary final PS&E documents in a bid-ready form. The final submittal shall include: one (1) complete full size (24”x36”) plan set of stamped reproducible mylars and electronic copy (PDF format), final cost estimate (stamped, in Excel and PDF format), and three (3) copies of the stamped final specifications (in Word and PDF format) delivered to the City, along with a USB drive containing all electronic files including AutoCAD drawing files. After completion of construction, Siegfried will incorporate the red lines (provided by contractor) into a set of as-built record drawings.
Siegfried will provide all correspondence and work products for City files.
TASK 4: COORDINATION/MEETINGS
Siegfried will attend meetings with City staff as needed to finalize the design. At a minimum, this will include a project kickoff meeting, a pre-construction meeting, a post-construction meeting, and to meet and assist staff during construction as required.
TASK 5: DESIGN SUPPORT DURING CONSTRUCTION
As part of the proposal, Siegfried will include bid support services that consist of assisting the City in responding to bidder’s questions during the project advertisement phase. Siegfried will also include services for design support during construction.
These services include responding to all RFI(s), submittal reviews, altering project plans to address any design changes or inconsistencies, attendance of meetings during construction, consultation with the construction contractor and/or the project manager. Any design changes that are determined to be an error or omission will be at no additional charge to the City.
TASK 6: AS-BUILT DRAWINGS
Siegfried will prepare as-built drawings upon receipt of red-lines from the contractor. Siegfried will produce one complete set of as-built drawings. Changes should be reflected on the original mylars either by hand or a new printed (mylar) sheet in AutoCAD.
TASK 7.1: PRESERVING AND PERPETUATING SURVEY MONUMENTS
Siegfried will identify, list, and show existing survey monuments on construction plans. Siegfried will include language in the PS&E package to preserve all monumentation affected by the work being performed in accordance with Section 8771 of the Professional Land Surveyors Act in the Business and Professionals Code of the State of California. Siegfried will sign the Acknowledgment of Monument Preservation form.
EXHIBIT A Page 11 of 32 ATTACHMENT B 853
Siegfried will assist the City in obtaining rights of entry documentation from property owners where work is required on their property. Siegfried will send out letters to property owners with a right of entry form (provided by the City) and any exhibits needed to adequately portray the work to be done. These documents are meant for minor conform work that is needed to conform the adjacent properties to the final project.
EXHIBIT A
EXHIBIT A
TASK 7.2: RIGHTS OF ENTRY
ATTACHMENT B 854
21 CIVIL
■ STRUCTURAL ■ LANDSCAPE ARCHITECTURE ■ SURVEYING ■ PLANNING ■ ATHLETIC FACILITY DESIGN 3428 Brookside Road, Stockton, CA 95219
■ (t) 209.943.2021 (f) 209.942.0214 ■ siegfriedeng.com
SCHEDULE
ID Task Name Duration Start Finish Predecessors
1 Airport Way Bridge Repair Project 536 days Mon 5/16/22 Mon 6/3/24 2 City Issues NTP 0 days Mon 5/16/22 Mon 5/16/223 Background Research 10 days Mon 5/16/22 Fri 5/27/224 Obtain Historical Documents and Review 10 days Mon 5/16/22 Fri 5/27/22 2 5 Research Boundary 2 days Mon 5/16/22 Tue 5/17/22 26 Prepare Utility A Letters 3 days Mon 5/16/22 Wed 5/18/22 27 Perform Topographic and Boundary Surveys 10 days Mon 5/16/22 Fri 5/27/22 28 Construction Documents and Estimates 230 days Mon 5/30/22 Fri 4/14/23 9 CEQA 90 days Mon 5/30/22 Fri 9/30/22 7
10 Permitting 180 days Mon 8/8/22 Fri 4/14/23 13
11 30% Submittal 50 days Mon 5/30/22 Fri 8/5/22
12 Prepare for 30% Submittal 25 days Mon 5/30/22 Fri 7/1/22 7 13 Agency Plan Check 25 days Mon 7/4/22 Fri 8/5/22 12
14 65% Submittal 55 days Mon 8/8/22 Fri 10/21/22
15 Prepare for 65% Submittal 30 days Mon 8/8/22 Fri 9/16/22 13 16 Agency Plan Check 25 days Mon 9/19/22 Fri 10/21/22 1517 100% and Final Submittals 60 days Mon 10/24/22 Fri 1/13/23 18 Prepare for 100% Submittal 30 days Mon 10/24/22 Fri 12/2/22 16 19 Agency Final Review and Approval 30 days Mon 12/5/22 Fri 1/13/23 1820 Advertise and Contract Award 116 days Mon 4/17/23 Mon 9/25/23 21 Final Plan Approvals & Bid Package Prep 5 days Mon 4/17/23 Fri 4/21/23 10 22 Advertise Project to Bidders 25 days Mon 4/24/23 Fri 5/26/23 2123 Bid Opening 0 days Fri 5/26/23 Fri 5/26/23 2224 Final Staff Report 15 days Mon 5/29/23 Fri 6/16/23 2325 City Council Authorization 41 days Mon 6/19/23 Mon 8/14/23 2426 Biology Pre-Construction Survey 5 days Tue 8/15/23 Mon 8/21/23 2527 Award Contract 25 days Tue 8/15/23 Mon 9/18/23 2528 Issue Notice to Proceed 5 days Tue 9/19/23 Mon 9/25/23 2729 Construction 180 days Tue 9/26/23 Mon 6/3/24 28 AprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul AugSepOctNovDecJanFebMarAprMayJun Jul Au g
2023 2024
Rolled Up Critical TaskRolled Up TaskSummaryMilestoneCritical TaskTask Group By SummaryProject SummaryExternal TasksSplitRolled Up ProgressRolled Up Milestone Manual Summary RollupDuration-onlyManual TaskInactive SummaryInactive MilestoneInactive Task Manual ProgressDeadlineProgressFinish-onlyStart-onlyManual Summary
PROJECT SCHEDULE
CITY OF STOCKTON AIRPORT WAY BRIDGE REPAIR
CITY OF STOCKTON, CALIFORNIA
Tue 2/22/22
Date: Tue 2/22/22Project: Airport Way Bridge Repair
EXHIBIT B Page 13 of 32 ATTACHMENT B 855
Siegfried ESA
PROJECT
TOTAL
Task 1 Background Research & Memorandum
1.1 Background Research and Survey $15,000 $15,000
Task 2 Environmental and Permitting
2.1 CEQA and Permitting $6,000 $47,000 $53,000
Task 3 PS&E's
3.1 30% Submittal $15,000 $15,000
3.2 65% Submittal $20,000 $20,000
33 100% and Final Submittals $15,000 $15,000
Task 4 Coordination and Meetings
4.1 Project Management $5,000 $5,000
4.2 Monthly Meetings $5,000 $5,000
Task 5 Design Support During Construction
5.1 Bidding $2,000 $2,000
5.2 Construction Support $10,000 $10,000
Task 6 As Built Drawings
6.1 As Built Drawings $2,000 $2,000
Task 7 Monument Preservation and ROE
7.1 Preserving Survey Monuments $2,000 $2,000
7.2 Rights of Entry $2,000 $2,000
Total Cost $97,000 $47,000 $144,000
Proposed Fee for the City of Stockton
Airport Way Bridge Repair Project
EXHIBIT C
ATTACHMENT B 856
NOTE: The City of Stockton is now using the online insurance program PINS Advantage. Once you have been awarded a contract you will receive an email from the City’s online insurance program requesting you to forward the email to your insurance provider(s).
AIRPORT WAY BRIDGE OVER MORMON SLOUGH FIRE REPAIR
PROJECT NO. WT19009
Insurance Requirements for Professional Services
Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representatives, or employees.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: Insurance Services Office Form Number CA 0001 covering, Code 1 (any auto), or if Contractor has no owned autos, Code 8 (hired) and 9 (nonowned), with limit no less than $1,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident for bodily injury or disease.
(Not required if Contractor provides written verification it has no employees)
4. Professional Liability (Errors and Omissions) Insurance appropriate to the Contractor’s profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. (If Claims-made, see below.)
It shall be a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be available to the Additional Insured. Furthermore, the requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this Agreement; or (2) the broader coverage and maximum limits of coverage of any Insurance policy or proceeds available to the named insured; whichever is greater. No EXHIBIT D Page 15 of 32 ATTACHMENT B 857
representation is made that the minimum insurance requirements of this agreement are sufficient to cover the obligations of the Contractor under this agreement.
Limits of Insurance
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City of Stockton, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used). Additional insured Name of Organization shall read “City of Stockton, its officers, officials, employees, and volunteers.” Policy shall cover City of Stockton, its officers, officials, employees, and volunteers for all locations work is done under this contract.
Primary Coverage
The Additional Insured coverage under the Contractor’s policy shall be “primary and non-contributory” and will not seek contribution from the City’s insurance or selfinsurance and shall be at least as broad as CG 20 01 04 13. The City of Stockton does not accept endorsements limiting the Contractor’s insurance coverage to the sole negligence of the Named Insured.
Notice of Cancellation
Each insurance policy required above shall state that coverage shall not be canceled, except with notice to the City of Stockton.
EXHIBIT D
ATTACHMENT B 858
Waiver of Subrogation
Contractor hereby grants to City of Stockton a waiver of any right to subrogation which any insurer of said Contractor may acquire against the City of Stockton by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City of Stockton has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City of Stockton for all work performed by the Contractor, its employees, agents and subcontractors.
Self-Insured Retentions
All Self-insured retentions must be disclosed to Risk Management for approval and shall not reduce the limits of liability. The City of Stockton may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City of Stockton.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City of Stockton.
Claims Made Policies (note – applicable only to professional liability) If any of the required policies provide coverage on a claims-made basis:
1. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.
3. If coverage is canceled or non-renewed, and not replaced with another claimsmade policy form with a Retroactive Date prior to the contract effective date, the Contractor must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.
Verification of Coverage
Contractor shall furnish the City of Stockton with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required EXHIBIT D Page 17 of 32 ATTACHMENT B 859
by this clause. All certificates and endorsements are to be received and approved by the City of Stockton Risk Services before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City of Stockton reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Contractor shall, prior to the commencement of work under this Agreement, provide the City of Stockton with a copy of its declarations page(s) and endorsement page(s) for each of the required policies.
Subcontractors
Contractors shall require and verify that all subcontractors, or other parties hired for this work, purchase and maintain coverage for indemnity and insurance requirements as least as broad as specified in this agreement to the extent they apply to the scope of the subcontractor’s work with the same certificate of insurance requirements and naming as additional insureds all parties to this contract. Contractor shall include the following language in their agreement with Subcontractors: “Subcontractors hired by Contractor agree to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to City under the contract documents and provide a valid certificate of insurance and the required endorsements included in the agreement as proof of compliance prior to commencement of any work and to include this same requirement for any subcontractors they hire for this work. A copy of the owner contract document indemnity and insurance provisions will be furnished to the subcontractor upon request.” Contractor shall provide proof of such compliance and verification to the City upon request.
Special Risks or Circumstances
City of Stockton reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
Certificate Holder Address
Proper address for mailing certificates, endorsements and notices shall be:
City of Stockton Attn: City Risk Services
400 E Main Street, 3rd Floor – HR
Stockton, CA 95202
EXHIBIT D
ATTACHMENT B 860
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No. 1 of 14
DISCRIMINATION AND Effective Date: Revised From: HARASSMENT POLICY 7/27/09 5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment in the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 I. PURPOSE
The purpose of this policy is to reaffirm the City's commitment to demonstrating respect for all individuals by strictly prohibiting discrimination and harassment, including sexual harassment in the workplace. This policy defines prohibited behavior and conduct, and sets forth a procedure for reporting, investigating and resolving complaints of discrimination, harassment, in the workplace, including retaliation and hostile work environment.
II. POLICY
A. The City of Stockton prohibits any form of discrimination and/or harassment of any person based on race, religious creed, color, national origin, ancestry, military and veterans status, physical or mental disability, medical condition, genetic characteristics or information, denial of family and medical care leave, marital status, sexual orientation, sex (including gender, gender identity, gender expression, transgender, pregnancy, childbirth and breastfeeding), political affiliation, age (40 and older), concerted labor activity, or any other category or attribute consistent with state or federal law.
All such discrimination and harassment is unlawful and shall not be tolerated. In addition, under the federal Affordable Care Act (ACA), the City of Stockton prohibits discrimination and/or harassment, or retaliation against an employee who obtains coverage, receives a tax credit or subsidy through the Health Care "Market Place" or "Exchange."
B. It is an unlawful employment practice to discriminate against or to harass an unpaid intern or volunteer on the basis of any legally protected classification unless an exception applies, such as a bona fide occupational qualification.
C. The City will neither tolerate nor condone discrimination and/or harassment of employees by managers, supervisors, co-workers, or non-employees with whom City employees have a business service, or professional relationship.
D. All City employees and non-employees share a responsibility to assist in EXHIBIT E Page 19 of 32 ATTACHMENT B 861
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No. 2 of 14
DISCRIMINATION AND Effective Date: Revised From: HARASSMENT POLICY 7/27/09 5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment in the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 maintaining an employment environment free of discrimination and harassment. This policy applies to all aspects of City employment, including, but not limited to, hiring, reassignment, placement, promotion, employment action, disciplinary action, layoff, reemployment, transfer, leave of absence, compensation and benefits, training; or other terms of treatment of that person in an unpaid internship, or another limited duration program to provide unpaid work experience for that person, or the harassment of an unpaid intern or volunteer.
E. All allegations of discrimination and/or harassment shall be investigated immediately by the City, in accordance with this policy. If it is determined that any prohibited activity has occurred, remedial action shall be taken. Such action may include discipline up to and including discharge. In addition, under applicable law, individual supervisors and employees may be subject to personal liability and/or punitive damages in any litigation arising as a result of such conduct.
F. All new hires shall attend harassment awareness training, and supervisors and managers shall attend harassment awareness and prevention training for supervisors every two years.
G. The City of Stockton prohibits retaliation against any employee or nonemployee by another employee, non-employee, supervisor, or manager for reporting, filing, testifying, assisting or participating in any manner in any investigation, proceeding, or hearing conducted by the employer or a federal or state enforcement agency.
H. This policy applies to all officials, employees, volunteers, unpaid interns, agents, or contractors of the City.
I. This policy shall be administered by the Director of Human Resources.
EXHIBIT E Page 20 of 32 ATTACHMENT B 862
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No. 3 of 14
DISCRIMINATION AND Effective Date: Revised From: HARASSMENT POLICY 7/27/09 5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment m the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 Ill. DEFINITION AND EXAMPLES OF DISCRIMINATION AND HARASSMENT A. "Discrimination," as used in this policy, is any action, behavior, practice, or process that is intended to deny, or results in the denial of, employment rights, privileges, or benefits because of a person's race, religious creed, color, national origin, ancestry, military and veterans status, physical or mental disability, medical condition, genetic characteristics or information, denial of family and medical care leave, marital status, sexual orientation, sex (including gender, gender identity, gender expression, transgender, pregnancy, childbirth and breastfeeding), political affiliation, age (40 and older), concerted labor activity, or any other prohibition identified under state and federal law. The following are examples of conduct that may constitute discrimination:
1. Soliciting applications from a source where all or most of potential workers are of the same race or color.
2. Considering a person's gender as the basis for differences in pay, work assignments, performance evaluations, training, discipline, or any other area of employment; and
3. Questioning a job applicant about the existence, nature and severity of a disability.
B. "Harassment," as used in this policy, consists of any conduct affecting another person because of his or her race, religious creed, color, national origin, ancestry, military and veterans status, physical or mental disability, medical condition, genetic characteristics or information, denial of family and medical care leave, marital status, sexual orientation, sex (including gender, gender identity, gender expression, transgender, pregnancy, childbirth and breastfeeding), political affiliation, age (40 and older), concerted labor activity, or any other category or attribute identified under state and federal law when such conduct has the purpose or the effect of: (1) creating an intimidating, hostile or offensive work environment; (2) unreasonably interfering with the employee's or non-employee's work performance; or (3) EXHIBIT E Page 21 of 32 ATTACHMENT B 863
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No. 4 of 14
DISCRIMINATION AND
HARASSMENT POLICY Effective Date: Revised From:
7/27/09
5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment in the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 otherwise adversely affecting an employee's or non-employee's employment opportunities.
Harassment may take many forms, including, but not limited to, the following examples:
1. Verbal Harassment: Epithets, derogatory and offensive comments or slurs based on race, religion, color, national origin, ancestry, physical or mental disability, marital status, pregnancy, medical condition, gender, sexual orientation, political affiliation, age, or any other category or attribute identified under state and federal law.
2. Physical Harassment: Assault, impeding or blocking movement that results in the physical interference with normal work or movement on the basis of race, religion, color, national origin, ancestry, physical or mental disability, marital status, pregnancy, medical condition, gender, sexual orientation, political affiliation, age, or any other category or attribute identified under state and federal law.
3. Visual Harassment: The displaying of posters, photography, notices, bulletins, e-mails, cartoons or drawings with derogatory and offensive content based on race, religion, color, national origin, ancestry, physical or mental disability, marital status, pregnancy, medical condition, gender, sexual orientation, political affiliation, age, or any other category or attribute identified under state and federal law.
C. "Sexual harassment," as used in this policy, is a subcategory of harassment, and is specifically defined by law as unwanted sexual advances, requests for sexual favors or visual, verbal or physical conduct of a sexual nature when:
1. Submission to such conduct is made a term or condition of employment; or
2. Submission to or rejection of such conduct is used as a basis for employment decisions affecting the individual; or
EXHIBIT E Page 22 of 32 ATTACHMENT B 864
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No. 5 of 14
DISCRIMINATION AND
HARASSMENT POLICY Effective Date: Revised From:
7/27/09
5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment in the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93
3. Such conduct has the purpose or effect of unreasonably interfering with an employee's or non-employee's work performance or creating an intimidating, hostile or offensive working environment because of the persistent, severe or pervasive nature of the conduct.
Examples of Sexual Harassment include, but are not limited to the following:
a. Unwelcome sexual overtures or propositions.
b. Offering employment benefits or status in exchange for sexual favors.
c. Making or threatening retaliation after a negative response to sexual advances.
d. Visual conduct such as leering, making sexual gestures, displaying sexually suggestive objects or pictures, cartoons, calendars or posters.
e. Verbal conduct such as using epithets or slurs, telling sexually explicit jokes, or making derogatory or suggestive comments about a person's body or dress.
f. Written communications of a sexual nature distributed in hard copy, soft copy or via a computer network.
g. Verbal abuse of a sexual nature, graphic verbal commentary about an individual's body, sexually degrading words to describe an individual, suggestive or obscene letters, notes or invitations.
h. Physical conduct such as touching, assaulting, impeding or blocking movements.
EXHIBIT E Page 23 of 32 ATTACHMENT B 865
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No. 6 of 14
DISCRIMINATION AND Effective Date: HARASSMENT POLICY Revised From:
7/27/09
5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment in the Workplace) revised from 10/21/94, 5/1/95. 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 i. Retaliation for making harassment reports or threatening to report harassment.
D. Affordable Care Act (ACA) Anti-Retaliation
Pursuant to section §1558 of the Affordable Care Act, the City prohibits discrimination or retaliation towards any employee who:
1. Receives a health insurance tax credit or subsidy through the Health Care "Marketplace" or "Exchange", by which can trigger a penalty payable by the employer;
2. Reports potential violations of protections afforded under Title I of the Act, which provides guaranteed availability protections among other things;
3. Testifies in a proceeding concerning such violation;
4. Assists or participates in a proceeding concerning a violation; or
5. Objects to, or refuses to participate in, any activity, policy, practice, or assigned task that the employee reasonably believes to be in violation of any provision of the Title I of the Act.
An employee who believes that he or she has been discharged or otherwise discriminated against in violation of section §1558 of the Affordable Care Act may seek relief in accordance with the procedures, notifications, burdens of proof, remedies, and statutes of limitation set forth in section 2087(b) of title 15, United States Code.
IV. REPORTING AND COMPLAINT PROCEDURES
A. Immediate Action Required
The City's reporting and complaint procedures provide for an immediate, thorough and objective investigation of discrimination or harassment claims, appropriate disciplinary action taken against any person found to have engaged in prohibited behavior, and appropriate alternative remedies to any EXHIBIT E Page 24 of 32 ATTACHMENT B 866
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No. 7 of 14
DISCRIMINATION AND Effective Date: Revised From: HARASSMENT POLICY 7/27/09 5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment in the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 employee or non-employee subject to discrimination or harassment. To accomplish this, such incidents must be reported immediately to a supervisor or manager.
1. Employee's and Non-Employee's Responsibilities when Subjected to Discrimination and/or Harassment
a. Employees or non-employees who believe they have been subjected to discrimination or harassment, or are aware of discrimination or harassment against others, shall report the situation immediately to his/her supervisor or manager, except as specified in subsection (b), below. Employees and nonemployees shall report any such incidents occurring in the workplace, whether committed by coworkers, supervisors or managers, or third persons doing business with the City, such as customers or vendors, or other non-employees. If
comfortable doing so, an employee or non-employee who has a complaint of discrimination or harassment is encouraged to directly inform the person(s) engaging in the behavior that such conduct is offensive and insist the behavior to stop.
b. Employees and non-employees must immediately contact a supervisor or manager to register a complaint of discrimination or harassment, unless that supervisor or manager is the individual engaging in the unwanted behavior. In that case, the employee or non-employee may contact someone at the next supervisory level. If the employee or non-employee feels uncomfortable dealing directly with his or her immediate supervisor or manager, he or she may contact the department head, or the Director of Human Resources (or either of their designees) to register a complaint of discrimination or harassment.
c. Employees and non-employees may file a formal complaint of harassment or discrimination with their department head or EXHIBIT E Page 25 of 32 ATTACHMENT B 867
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No. 8 of 14
DISCRIMINATION AND
HARASSMENT POLICY Effective Date: Revised From:
7/27/09
5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment In the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 with Human Resources. To assist the City in conducting a thorough investigation, complaints shall be submitted in writing and shall include specific details of the incident(s), the names of the individuals involved, the names of any witnesses, and any documentary evidence (notes, pictures, cartoons, etc.) that will corroborate the allegations.
d. Employees and non-employees shall immediately report any retaliation to a supervisor, manager, department head or Director of Human Resources (or designee). All retaliation complaints shall be immediately, objectively and thoroughly investigated in accordance with the investigation procedures.
If a report of retaliation is substantiated, appropriate disciplinary action, up to and including discharge shall be taken.
2. Supervisor's or Manager's Responsibilities to Eliminate Discrimination and/or Harassment
a. A supervisor or manager is responsible for enforcing the City's discrimination and harassment policy. Supervisors or
managers must ensure that all employees and non-employees are aware of the City's policy through open discussion of the policy at staff meetings and by posting the policy in a conspicuous location accessible to all staff members.
b. A supervisor or manager shall be cognizant of employees' and non-employees' behavior and shall not permit any employee or non-employee under their supervision to be subjected to or engage in any conduct prohibited by this policy.
c. A supervisor or manager who observes conduct prohibited by this policy shall immediately direct the employee or nonemployee to cease the conduct.
EXHIBIT E Page 26 of 32 ATTACHMENT B 868
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No. 9 of 14
DISCRIMINATION AND Revised From: HARASSMENT POLICY Effective Date:
7/27/09
5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment in the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 d. A supervisor or manager who receives a complaint of
prohibited conduct is required to take the complaint seriously, and report the matter immediately to the department head; be supportive of the complainant; ensure there is no retaliation against the complainant; conduct an internal fact-finding review into the allegations; obtain as much detailed information as possible; thoroughly document the findings; communicate in written form to the parties the resolution of the complaint; and report to and consult with the Human Resources Department promptly, without delay.
B. Confidentiality. The City will make every effort to protect the privacy and confidentiality of all parties involved, as well as any information and/or documentation obtained, to the extent possible consistent with a thorough investigation.
C. Penalty for Non-Compliance. The City shall take disciplinary action, up to and including discharge, against any supervisor or manager who fails in his/her responsibility to take immediate action in response to an employee's or non-employee's complaint of discrimination or harassment. Further, such disciplinary action shall be taken against a supervisor or manager who fails to stop discriminatory or harassing conduct committed in his/her presence or to stop such conduct about which the supervisor or manager has knowledge.
V. INVESTIGATION PROCEDURES
A. Determination of Responsibility for Investigation
If a formal complaint is filed with the department head or the Director of Human Resources (or either of their designees), the department head and the Director of Human Resources shall consult with one another to determine whether the department or Human Resources shall conduct the fact-finding investigation into the allegations. Either the department head or the Director of Human Resources (or either of their designees), depending on who is EXHIBIT E Page 27 of 32 ATTACHMENT B 869
Subject:
B.
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No.10 of 14
DISCRIMINATION AND Effective Date: Revised From: HARASSMENT POLICY 7/27/09 5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment In the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 responsible for the investigation, shall issue written notification to the complainant and alleged harasser(s). The notification shall specify the nature of the complaint, and inform the parties that an investigation into the allegations of discrimination and/or harassment shall be conducted.
Investigative Guidelines
The investigation shall include the following steps taken in the order best suited to the circumstances:
1. Identify and preserve the evidence.
2. Confirm the name and position of the complainant. Interview the complainant.
3. Allow the complainant the opportunity to place the complaint in writing.
4. Obtain the identity of the alleged harasser(s).
5. Obtain as many details as possible regarding the incident(s) that prompted the complaint, including the number of occurrences, dates, times, locations, and witnesses (if applicable).
6. Ascertain how the complainant felt about the alleged incident when it occurred; complainant's response(s) to the alleged behavior; and witness statements (if applicable).
7. Ascertain if any threats or promises were made in connection with the alleged harassment.
8. Ascertain if the complainant knows of or suspects that there are other victims of harassment by the same person(s).
9. Ascertain whether the complainant has spoken to anyone, especially EXHIBIT E Page 28 of 32 ATTACHMENT B 870
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No. 11 of 14
DISCRIMINATION AND
HARASSMENT POLICY Effective Date: Revised From:
7/27/09
5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment m the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 supervisors, about the harassment.
10. Ascertain what resolution would be acceptable to the complainant.
11. Interview the alleged harasser to get his or her side of the story, including any possible motivation for a false allegation.
12. Interview witnesses who were identified by the complainant regarding the alleged harasser or other persons identified during the investigation.
13. Interview witnesses who were identified by the alleged harasser or other persons identified during the investigation.
14. Advise all participants that the investigation is "confidential" and not to engage in any retaliatory conduct, as such conduct is subject to disciplinary action up to and including discharge. Confidentiality will be maintained to the extent possible. An individual who is interviewed during the course of an investigation is prohibited from discussing the substance of the interview, except as otherwise directed by a supervisor or the Director of Human Resources. Any individual who discusses the content of an investigatory interview will be subject to discipline or other appropriate sanction.
15. Conduct follow-up interviews, if warranted.
16. Prepare report of findings and discuss with management and designated legal staff.
VI. RESPONDING TO THE COMPLAINT
A. Following the completion of the fact-finding investigation, either the department head or the Director of Human Resources (or either of their designees), depending on who is responsible for the investigation, shall EXHIBIT E Page 29 of 32 ATTACHMENT B 871
Subject:
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Directive No. HR-15 Page No.12 of 14
DISCRIMINATION AND Effective Date: Revised From: HARASSMENT POLICY 7/27/09 5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment in the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 make a report of findings, along with a recommendation regarding the appropriate remedial action to be taken, if warranted. The recommendation shall be made after reviewing the findings of the investigation, giving consideration to all factual information, the nature of the alleged conduct, and the totality of the circumstances. If the investigation was conducted by the Director of Human Resources, or designee, the Director, or designee, shall confer with the affected department head and both shall concur on the remedial action to be taken, if any. If the investigation was conducted by the department head, the department head shall confer with the Director of Human Resources prior to making the report of findings and both shall concur on the remedial action to be taken, if any.
B. If either the department head or the Director of Human Resources does not concur with the findings and recommendation of the other, the City Attorney (or designee) shall review and resolve the matter in dispute.
C. Report of findings and recommendation shall be treated as a confidential document and no other distribution shall be made without first consulting with the City Attorney's Office. A completed investigation report will not be disclosed, except as it is deemed necessary to support a disciplinary action, to take remedial action, to defend the City in adversarial proceedings, or to comply with the law or court order.
D. Either the department head or the Director of Human Resources (or either of their designees), depending on who is responsible for the investigation shall provide a written response to the complainant and the person alleged to have committed the misconduct, discrimination and/or harassment. The response shall include a copy of the City's discrimination and harassment policy and a memorandum indicating the City's determination as to whether the complaint is:
1. Unsustained: The investigation failed to disclose sufficient evidence to substantiate the allegation(s).
2. Unfounded: The investigation proved that the act(s) or omission(s) EXHIBIT E Page 30 of 32 ATTACHMENT B 872
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Subject: Directive No. HR-15 Page No. 13 of 14
DISCRIMINATION AND Effective Date: Revised From: HARASSMENT POLICY 7/27/09
3. 5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment in the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 complained of did not occur. The finding also applies when the individual employee(s) named in the complaint were not involved in the act(s) or omission(s) alleged.
Sustained: The investigation disclosed sufficient evidence to substantiate the allegation(s) made in the complaint; appropriate action will be taken.
E. Details regarding any specific fact-findings or disciplinary action to be taken will not be communicated to the complainant. The City Attorney shall review the response for legal sufficiency before dissemination.
F. The City shall close and retain the investigation file, in accordance with applicable laws, regulations, and City policy regarding retention of City records.
VII. DISCIPLINE
Disciplinary action imposed as a result of any investigation conducted pursuant to this policy shall be commensurate with the severity of the offense, up to and including discharge, even for a first offense.
VIII. ALTERNATIVE REMEDIES
If upon exhausting all internal remedies to file, investigate, and respond to a charges of discrimination/harassment, pursuant to title VII of the Federal Civil Rights Act of 1964 (42 U.S.C §§ 2000e et seq.), any person has a right to file a charge of discrimination/harassment with the Equal Employment Opportunity Commission ("EEOC"). In addition, pursuant to the California Fair Employment and Housing Act (Gov. Code §§ 12900 - 12996.) a person may also file a complaint of discrimination/harassment with the California Department of Fair Employment and Housing ("DFEH"). Employees or non-employees who believe that they have been subjected to discrimination/harassment may file a complaint with either of these EXHIBIT E Page 31 of 32 ATTACHMENT B 873
CITY OF STOCKTON, CALIFORNIA
CITY MANAGER ADMINISTRATIVE DIRECTIVE
Subject: Directive No. HR-15 Page No. 14 of 14
DISCRIMINATION AND
HARASSMENT POLICY Effective Date: Revised From:
7/27/09
5/1/2015 4/6/09
3/1/2010
(see below)
PER-015 (Sexual Harassment in the Workplace) revised from 10/21/94, 5/1/95, 1/1/98 PER-037 (Sexual Harassment Investigative Procedures) revised from 2/15/93 agencies. Both the EEOC and DFEH serve as neutral fact-finders and attempt to assist parties in resolving disputes voluntarily.
IX. COMMUNICATION OF POLICY
This policy shall be provided to all managers, supervisors, employees, volunteers, unpaid interns, agents or contractors of the City and shall be posted in the appropriate places. All employees shall participate in City approved harassment awareness training as directed by management or Human Resources; and all supervisors, as required by law, shall participate in City approved interactive harassment awareness training and education sessions at least once every two years, or as otherwise specified by law.
APPROVED:
c:r��SON
CITY MANAGER
::ODMA\GRPWISE\COS.PER.PER_Library:96180.1
EXHIBIT E Page 32 of 32 ATTACHMENT B 874
City of Stockton
Legislation Text
File #: 22-0413, Version: 1
ADOPT RESOLUTION TO AUTHORIZE THE NEIGHBORHOOD TRAFFIC MANAGEMENT
PROGRAM - TRAFFIC CIRCLES PROJECT
RECOMMENDATION
It is recommended that the City Council adopt a resolution to:
1. Approve the Notice of Exemption No. NOE77-21 under the California Environmental Quality Act for the Neighborhood Traffic Management Program - Traffic Circles, Project No. WT16008.
2. Approve the plans and specifications for the Neighborhood Traffic Management Program - Traffic Circles, Project No. WT16008.
3. Award a Construction Contract in the amount of $517,686.50 to McFadden Construction, Inc. of Stockton, CA, for the Neighborhood Traffic Management Program - Traffic Circles, Project No. WT16008.
It is also recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this resolution.
Summary
The City developed a Neighborhood Traffic Management Program (NTMP) to help improve safety and the quality of life for neighborhood residents by reducing the impacts from speeding vehicles and, to a lesser extent, cut-through traffic. Neighborhoods have the choice of using the Expedited Speed Hump Program or the Full Traffic Calming Program. The Expedited Speed Hump Program only provides speed hump devices, but neighborhoods receive these measures much faster. The Full Traffic Calming Program can involve more aggressive traffic calming measures that require design, more funding, and generally takes much more time for neighborhoods to see the improvements installed.
The Mosswood Park Area and Sierra Meadows Area neighborhoods have opted to use both the Expedited Speed Hump and Full Traffic Calming NTMP measures. The measures identified and approved by the neighborhoods were comprised of speed humps and traffic circles. All measures have been installed with the exception of a traffic circle for each of the neighborhoods. Design of the traffic circles was recently completed and advertised for bids.
On March 31, 2022, the City received three bids for the project. Staff recommends award of the Construction Contract to the lowest responsive bidder, McFadden Construction, Inc., in the amount of $517,686.50. Staff also recommends that Council adopt a resolution approving Notice of Exemption No. NOE77-21 under the California Environmental Quality Act (CEQA) and approving the plans and specifications for the project. Construction is anticipated to be completed by winter 2022.
City of Stockton Page 1 of 3 Printed on 7/5/2022
powered by Legistar™
875
File #: 22-0413, Version: 1
DISCUSSION
Background
The City developed a NTMP to help improve safety and the quality of life for neighborhood residents by reducing the impacts from speeding vehicles and, to a lesser extent, cut-through traffic.
Neighborhoods have the choice of using the Expedited Speed Hump Program or the Full Traffic Calming Program. The Expedited Speed Hump Program only provides speed hump devices, but neighborhoods receive these measures much faster. The Full Traffic Calming Program can involve more aggressive traffic calming measures such as traffic circles and roundabouts, diversions, road closures, and pedestrian islands to name a few. These measures require design, more funding, and take longer for neighborhoods to see the improvements.
The Mosswood Park Area and Sierra Meadows Area neighborhoods have opted to use both the Expedited Speed Hump and Full Traffic Calming NTMP measures. The measures identified and approved by the neighborhoods were comprised of speed humps and traffic circles. The expedited measures, speed humps and cushions, have already been installed at locations approved by each neighborhood.
In addition, two traffic circles were approved for installation by the Mosswood Park Area and Sierra Meadows Area communities, at the intersections of Harvey Avenue/Wait Avenue and El Camino Avenue/El Cajon Avenue, respectively. Design of the traffic circles was completed by Siegfried Engineering, Inc. in February 2022.
On July 26, 2016, Council adopted a Community Workforce and Training Agreement (CWTA). The CWTA became effective August 25, 2016, and applies to all Public Works projects over $1 million that are bid after that date. On July 16, 2019, by Motion No. 2019-07-16-1403, Council extended the CWTA term to August 25, 2024. The CWTA was not applied to this project because the engineer’s estimate was under $1 million.
Present Situation
On March 7, 2022, the Neighborhood Traffic Management Program - Traffic Circles, Project No.
WT16008, was advertised for bids. On March 31, 2022, three bids were received with the following results:
COMPANY NAME BID AMOUNT ADJUSTED BID AMOUNT
(local preference applied)
McFadden Construction, Inc. $517,686.50 $507,332.77
(Stockton, CA)
George Reed, Inc. $684,606.00 $684,606.00
(Modesto, CA)
Dirt Dynasty, Inc. $738,942.00 $724,163.16
(Farmington, CA)
Engineer’s Estimate $742,379.50
City of Stockton Page 2 of 3 Printed on 7/5/2022
powered by Legistar™
876
File #: 22-0413, Version: 1
The requirements of Stockton Municipal Code (SMC) section 3.68.090, Local Business Preference, apply to this project. Both McFadden Construction, Inc. and Dirt Dynasty, Inc. are located within San Joaquin County limits and are entitled to a two percent bid preference. Application of the Local Business Preference has no effect on the bid order. The Local Employment Ordinance, SMC section
3.68.095, also applies to this contract.
The bid from McFadden Construction, Inc., the lowest responsive bidder, is regular in all respects.
McFadden Construction, Inc. has the proper license to perform the work. Staff recommends Council approve the plans and specifications for the project and award a Construction Contract to McFadden Construction, Inc. of Stockton, CA, in the amount of $517,686.50.
The project is in conformance with the City’s General Plan, pursuant to California Government Code, section 65402, and is categorically exempt from the requirements of CEQA as specified under Section 15301(c) of the CEQA guidelines. The activities related to this project constitute a discretionary project under the City’s jurisdiction and qualifies as a project that does not have a significant effect on the environment. The resolution will approve the filing of Notice of Exemption No.
NOE77-21 under CEQA. Construction is anticipated to be completed by winter 2022.
FINANCIAL SUMMARY
There are sufficient funds available in the Neighborhood Traffic Management Program - Traffic Circles, Project No. WT16008, Account No. 4570-000-800007-300-000-30-45-000-000, to award a Construction Contract to McFadden Construction, Inc. in the amount of $517,686.50.
There is no impact to the City’s General Fund or any other unrestricted fund as a result of taking the recommended actions.
Attachment A - Vicinity Map
City of Stockton Page 3 of 3 Printed on 7/5/2022
powered by Legistar™
877
D
THORNTON ROAD
LOWER
HAMMER LANE
BENJAMIN HOLT DRIVE
ROBINHOOD DRIVE
MARCH LANE
ALPINE AVENUE
SMITHS CANAL
ALPINE AVENUE
EL DORADO STREET
HARDING WAY
PACIFIC AVENUE
PERSHING AVENUE
HAMMER LANE
MORADA LANE
OLMAN ROAD
MARCH LANE
WILSON WAY
CHEROKEE RD
WATERLOO RD
MAIN STREET
AIRPORT WAY
MARTIN LUTHER KING JR./CHARTER WAY
CALIFORNIA ST
EL DORADO STREET
AIRPORT WAY
ARCH-AIRPORT WAY
EAR CREEK
HER
SLOUGH
PIX
BEAR CREEK
SOUTH BEAR CREEK
CALAVERAS RIVER
STOCKTON DEEP WATER CHANNEL
CALAVERAS RIVER
STOCKTON
UPRR
UPRR (SPRR)
AIRPORT WAY
WEST LANE
WEST LANE
EIGHTH STREET
SACRAM
NAVY DRIVE
CENTER STREET
FREMONT STREET
UPRR
DIVERTING CANAL
NTMP TRAFFIC CIRCLES
PROJECT NO. WT16008
CITY OF STOCKTON
DEPARTMENT OF PUBLIC WORKS
El Camino Avenue
and El Cajon Avenue
VICINITY MAP
NOT TO SCALE
LEGEND
N
PROJECT LOCATION
CITY LIMIT
COUNTY LIMIT
Harvey Avenue and
Wait Avenue
SIERRA MEADOWS
AREA NEIGHBORHOOD:
Intersection of El Camino Avenue
and El Cajon Avenue
MOSSWOOD PARK
AREA NEIGHBORHOOD:
Intersection of Harvey Avenue
and Wait Avenue
ATTACHMENT A 878
Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION APPROVING THE NOTICE OF EXEMPTION NO. NOE77-21,
APPROVING THE PLANS AND SPECIFICATIONS, AND AWARDING A
CONSTRUCTION CONTRACT FOR THE NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM – TRAFFIC CIRCLES, PROJECT NO. WT16008
On March 31, 2022, the City Clerk of the City of Stockton opened, examined, and publicly declared the sealed proposals or bids offered for the Neighborhood Traffic Management Program – Traffic Circles, Project No. WT16008; and The project will install traffic circles integrating yield signs around the circle; and McFadden Construction, Inc. is the lowest responsive bidder in the amount of $517,686.50, and its bid is regular in all respects; and The project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) as specified under section 15301(c) of the CEQA Guidelines, because this is a discretionary project under the City’s jurisdiction and qualifies as a project which has been determined to not have a significant effect on the environment; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The City Council approves the filing of Notice of Exemption No. NOE77-21 under CEQA for the Neighborhood Traffic Management Program – Traffic Circles, Project No. WT16008, attached as Exhibit 1 and incorporated herein by this reference.
2. The City Council approves the plans and specifications for the Neighborhood Traffic Management Program - Traffic Circles, Project No. WT16008.
3. The City Council awards a Construction Contract between the City of Stockton and McFadden Construction, Inc., in the amount of $517,686.50, and the City Manager is authorized and directed to execute same, attached as Exhibit 2 and incorporated herein by this reference.
//
//
//
//
879
4. The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED July 12, 2022 .
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
880
EXHIBIT 1 881
(Updated 12/31/20)
CONSTRUCTION CONTRACT
This contract is made and entered into on _____________, by and between MCFADDEN CONSTRUCTION, INC., a STATE OF CA CORPORATION, with a business address at 3817 E. FARMINGTON ROAD, STOCKTON, CA 95215, hereinafter called "CONTRACTOR," and CITY OF STOCKTON, a municipal corporation, hereinafter called "CITY."
W I T N E S S E T H:
WHEREAS, plans and specifications for the construction of NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM – TRAFFIC CIRCLES (PROJECT NO.
WT16008), hereinafter called “PROJECT,” were regularly adopted by Council Resolution No. __________________, on _________________; and WHEREAS, the contract for said work was regularly awarded to CONTRACTOR, by Council Resolution No. __________________, on ________________.
NOW, THEREFORE, in consideration of the promises and of the mutual covenants herein contained, the parties hereto expressly agree as follows:
CONTRACTOR agrees:
1. SCOPE OF SERVICES. To do the work and furnish all the labor, materials, tools, equipment, and insurance required for the construction of PROJECT in accordance with the plans and specifications adopted on _____________, by Council Resolution No. __________________ . The "contract documents," which include the bid documents, project plans, specifications, all letters of clarification, and the City of Stockton Standard Specifications and Plans, are incorporated into and made a part of this contract by this reference to the same extent as if fully set forth.
2. COMPENSATION. To do and perform the work contemplated hereby in a good and workmanlike manner and to furnish all labor, materials, tools, and equipment necessary therefore at the prices specified in Exhibit A, attached hereto and by reference made a part hereof, under the direction of and to the complete satisfaction of the Director of Public Works of the City of Stockton. Total compensation for services and reimbursement for costs shall not exceed $517,686.50, or as otherwise mutually agreed to in a Contract Change Order.
3. INSURANCE. CONTRACTOR shall not commence any work before obtaining, and shall maintain in force at all times during the duration and performance of this contract, the policies of insurance specified in Exhibit B, which is attached to this contract and incorporated by this reference, and as provided in the “contract documents” including Section 7-1.06 of the City of Stockton Standard Specifications and Plans as adopted on September 27, 2016, by Council Resolution No. 2016-09-27, effective September 27, 2016.
Local Construction Contract – MCFADDEN CONSTRUCTION, INC. – PROJECT NO. WT16008
Local Construction Contract – MCFADDEN CONSTRUCTION, INC. – PROJECT NO. WT16008 (Updated 12/31/20)
It shall be a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be available to the Additional Insured.
Furthermore, the requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this Agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named Insured; whichever is greater.
The Additional Insured coverage under the CONTRACTOR’s policy shall be “primary and non-contributory” and will not seek contribution from the City of Stockton’s insurance or self-insurance and shall be at least as broad as ISO CG 20 01 04 13.
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of the City of Stockton (if agreed to in a written contract or agreement) before the City of Stockton’s own insurance or selfinsurance shall be called upon to protect it as a named insured.
All self-insured retentions (SIR) must be disclosed to the CITY’s Risk Management for approval and shall not reduce the limits of liability. Payment Bond in the amount of the self-insured retention (SIR) may be required.
Policies containing any self-insured retention (SIR) provision shall provide or be endorsed to provide that the SIR may be satisfied by either the named insured or the CITY.
The CITY reserves the right to obtain a full certified copy of any insurance policy and endorsements.
Failure to exercise this right shall not constitute a waiver of right to exercise later.
CONTRACTOR shall maintain insurance as required by this contract to the fullest amount allowed by law and shall maintain insurance for a minimum of five years following the completion of this project. In the event contractor fails to obtain or maintain completed operations coverage as required by this agreement, the City at its sole discretion may purchase the coverage required and the cost will be paid by contractor.
CONTRACTOR agrees to include with all Subcontractors in their subcontract the same requirements and provisions of this agreement including the indemnity and insurance requirements to the extent they apply to the scope of the Subcontractor’s work.
Subcontractors hired by CONTRACTOR agree to be bound to CONTRACTOR and the
Local Construction Contract – MCFADDEN CONSTRUCTION, INC. – PROJECT NO. WT16008 (Updated 12/31/20)
CITY in the same manner and to the same extent as CONTRACTOR is bound to the CITY under the Contract Documents. Subcontractor further agrees to include these same provisions with any Sub-subcontractor. A copy of the CITY Contract Document Indemnity and Insurance provisions will be furnished to the Subcontractor upon request. The General CONTRACTOR shall require all sub-contractors to provide a valid certificate of insurance and the required endorsements included in the agreement prior to commencement of any work and contractor will provide proof of compliance to the City.
4. INDEMNITY AND HOLD HARMLESS. With the exception that this section shall in no event be construed to require indemnification by Contractor to a greater extent than permitted under the public policy of the State of California, Contractor shall indemnify, protect, defend with counsel approved by City and at Contractor’s sole cost and expense, and hold harmless City, its Mayor, Council, officials, representatives, agents, employees, and volunteers from and against any and all claims, causes of action, liabilities, judgments, awards, losses, liens, claims, stop notices, damages, expenses, and costs (including without limitation attorneys’ fees, expert and consultant fees, and other expenses of litigation) of every nature, including, but not limited to, death or injury to persons, or damage to property, which arise out of or are in any way connected with the work performed, materials furnished, or services provided under this Agreement, or from any violation of any federal, State, or municipal law or ordinance, or City Policy, by Contractor or Contractor’s officers, agents, employees, volunteers or subcontractors.
Contractor shall not be obligated to indemnify or defend City for claims finally determined by a court of law or arbitrator to arise from the active negligence or willful misconduct of the City. It is the intent of the Parties that this indemnity obligation is at least as broad as is permitted under California law. To the extent California Civil Code sections 2782, et seq., limit the defense or indemnity obligations of Contractor to City, the intent hereunder is to provide the maximum defense and indemnity obligations allowed by Contractor under the law. The indemnity set forth in this section shall not be limited by insurance requirements or by any other provision of this Agreement.
With exception that this section shall in no event be construed to require indemnification, including the duty to defend, by Contractor to a greater extent than permitted under the public policy of the State of California, the parties agree that Contractor’s duty to defend City is immediate and arises upon the filing of any claim against the City for damages which arise out of or are in any way connected with the work performed, materials furnished, or services provided under this Agreement by Contractor or Contractor’s officers, agents, employees, volunteers or subcontractors. Contractor’s duties and obligations to defend the City shall apply regardless of whether or not the issue of the City’s liability, breach of this Agreement, or other obligation or fault has been determined.
Contractor shall be immediately obligated to pay for City’s defense costs of the claim, including, but not limited to, court costs, attorney’s fees and costs, expert consultant and witness fees and costs, other witness fees, document reproduction costs, arbitration fees, and, if after final judgment an appeal is pursued, all of such costs for the appeal.
At the conclusion of the claim, if there is any determination or finding of sole active
Local Construction Contract – MCFADDEN CONSTRUCTION, INC. – PROJECT NO. WT16008 (Updated 12/31/20)
negligence or willful misconduct on the part of the City, City will then reimburse Contractor for amounts paid in excess of Contractor’s proportionate share of responsibility for the damages within 30 days after Contractor provides City with copies of all bills and expenses incurred in the defense of the claim(s). It is agreed between the parties that this reimbursement provision assures Contractor is not obligated to defend or indemnify City in an amount greater than provided for under California law, including, without limitation, California Civil Code sections 2782, 2782.6, and 2782.8.
With the exception that this section shall in no event be construed to require indemnification by Contractor to a greater extent than permitted under the public policy of the State of California, and in addition to the other indemnity obligations in this Agreement, Contractor shall indemnify, defend, and hold harmless City, its Mayor, Council, officials, representatives, agents, employees, and volunteers from and against all claims, losses, expenses, and costs including, but not limited to, attorneys’ fees, arising out of any claim brought against the City by an employee, office, agent, or volunteer of Contractor, regardless of whether such claim may be covered by any applicable workers compensation insurance. Contractor’s indemnification obligation is not limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Contractor under workers’ compensation acts, disability acts, or other employee benefit acts.
The City’s acceptance of the insurance certificates required under this Agreement does not relieve the CONTRACTOR from its obligation under this paragraph. The indemnification obligations of this section shall survive the termination of this agreement.
Any exceptions to this language may result in a proposal being deemed non-responsive.
CONTRACTOR/Subcontractor's responsibility for such defense and indemnity obligations shall survive the termination or completion of this agreement for the full period of time allowed by law.
The defense and indemnification obligations of this agreement are undertaken in addition to, and shall not in any way be limited by, the insurance obligations contained in this agreement. If any section, subsection, sentence, clause or phrase of this indemnification is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this indemnification.
5. STANDARD PLANS AND SPECIFICATIONS. The performance of said work and the furnishing of said materials shall be executed in accordance with Section 8-1.04B of the City of Stockton Standard Specifications and Plans as adopted on September 27, 2016, by Council Resolution No. 2016-09-27-1213, effective September 27, 2016, and the provisions of the issued project specifications.
The Director of Public Works will furnish CONTRACTOR a weekly statement showing the number of days charged to the contract for the preceding week, the number of days specified for completion of the contract, and the number of days remaining to complete
Local Construction Contract – MCFADDEN CONSTRUCTION, INC. – PROJECT NO. WT16008 (Updated 12/31/20)
the contract. CONTRACTOR will be allowed one (1) week in which to file a written protest setting forth in what respects said weekly statement is incorrect, otherwise the statement shall be deemed to have been accepted by CONTRACTOR as correct.
6. WORKING DAYS. This work shall be diligently prosecuted to completion before the expiration of 60 WORKING DAYS beginning on the tenth calendar day after the date shown on the Notice to Proceed. It is agreed by the parties to the contract that in case all the work called for under the contract in all parts and requirements, is not finished or completed within the number of days as set forth, damage will be sustained by the CITY, and that it is and will be impracticable and extremely difficult to ascertain the actual damage which CITY will sustain in the event of and by reason of such delay; and it is therefore agreed that CONTRACTOR will pay to CITY the sum of THREE THOUSAND FIVE HUNDRED AND NO/100 DOLLARS ($3,500) per day for each and every calendar day's delay in finishing the work in excess of the number of days prescribed; and CONTRACTOR agrees to pay said liquidated damages as herein provided, and in case the same are not paid, agrees that CITY, may deduct the amount thereof from any monies due or that may become due CONTRACTOR under the contract.
It is further agreed that in case the work called for under the contract is not finished and completed in all parts and requirements within the number of days as specified, the CITY shall have the right to increase the number of days or not, as may seem best to serve the interest of CITY, and if the CITY decides to increase the said number of days, the CITY shall further have the right to charge to CONTRACTOR, CONTRACTOR's heirs, assigns or sureties, and to deduct from the final payment for the work, all or any part, as may be deemed proper, the liquidated damages as specified or the actual cost of engineering, inspection, superintendence, and other overhead expenses which are directly chargeable to the contract, and which accrue during the period of such extension, whichever is greater, except the cost of final surveys and preparation of final estimate shall not be included in such charges.
A working day shall not include, nor shall CONTRACTOR be assessed with liquidated damages nor the additional cost of engineering and inspection during any delay beyond the time named for the completion of the work caused by acts of God or of the public enemy, acts of CITY, fire, floods, epidemics, quarantine restrictions, strikes, and freight embargoes and subject to approval by the Director of Public Works, inability to get materials ordered by CONTRACTOR or subcontractor due to such causes provided that CONTRACTOR shall notify the Director of Public Works in writing of the causes of delay within five (5) working days from the beginning of any such delay, and the Director shall ascertain the facts and the extent of the delay, and Director's findings of the facts thereon shall be final and conclusive.
If CONTRACTOR is delayed by reason of alterations made in these specifications, or by any act of the Director of Public Works or of the CITY, not contemplated by the contract, the time of completion shall be extended proportionately and CONTRACTOR shall be
Local Construction Contract – MCFADDEN CONSTRUCTION, INC. – PROJECT NO. WT16008 (Updated 12/31/20)
relieved during the period of such extension of any claim for liquidated damages, engineering or inspection charges or other penalties. CONTRACTOR shall have no claim for any other compensation for any such delay.
7. CONFORMANCE TO APPLICABLE LAWS. Contractor shall comply with all applicable Federal, State, and Municipal laws, rules, and ordinances. Contractor shall not discriminate in the employment of persons or in the provision of services under this Contract on the basis of any legally protected classification, including race, color, national origin, ancestry, sex or religion of such person.
a. TITLE VI
Title VI of the Civil Rights Act of 1964 requires that “no person in the United States shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance.” (42 USC Section 2000d)
http://www.dol.gov/oasam/regs/statutes/titlevi.htm.
The City of Stockton requires compliance with the requirements of Title VI in all of its programs and activities regardless of funding source. b. DISCRIMINATION AND HARASSMENT POLICY
The City of Stockton has a Discrimination and Harassment Policy (Exhibit C). The purpose of this policy is to reaffirm the CITY’s commitment to demonstrating respect for all individuals by strictly prohibiting discrimination and harassment, including sexual harassment in the workplace, to define the types of behavior and conduct prohibited by this policy, and to set forth a procedure for reporting, investigating, and resolving complaints of discrimination and harassment in the workplace.
c. LABOR STANDARDS PROVISIONS/CALIFORNIA LABOR CODE
The bidder shall understand that conditions set forth in Chapter 1, Part 7, Division 2 of the California Labor Code shall be considered part of the contract agreement.
https://leginfo.legislature.ca.gov/faces/codes_displayText.xhtml?lawCode= LAB&division=2.&title=&part=7.&chapter=1.&article=2.
d. PREVAILING WAGE
CONTRACTOR and any subcontractor shall pay each employee engaged in the trade or occupation not less than the prevailing hourly wage rate. In
Local Construction Contract – MCFADDEN CONSTRUCTION, INC. – PROJECT NO. WT16008 (Updated 12/31/20)
accordance with the provisions of Section 1770 of the Labor Code, the Director of Department of Industrial Relations of the State of California has determined the general prevailing wage and employer payments for health and welfare, pension, vacation, travel time, and subsistence pay as provided for in Section 1773.1, apprenticeship or other training programs authorized by Section 3093 and similar purposes applicable to the work to be done. CONTRACTOR performing the work under this contract shall obtain a copy of the wage rate determination and shall distribute copies to each subcontractor. As the wage determination for each craft reflects an expiration date, it shall be the prime CONTRACTOR and each subcontractor's responsibility to ensure that the prevailing wage rates of concern is current and paid to the employee.
i. The CONTRACTOR performing the work shall be responsible for obtaining a copy of the State wage rate determination. State wage rates may be obtained at
http://www.dir.ca.gov/OPRL/pwd/Determinations/Northern/Northern.pd f. The CONTRACTOR shall be responsible for posting said wage rates at a prominent location at the work site and shall maintain same in a good readable condition for the duration of the work.
ii. Should the CONTRACTOR choose to work on a Saturday, Sunday or on a holiday recognized by the Labor Unions, the CONTRACTOR shall reimburse the CITY the actual cost of engineering, inspection, superintendence, and or other overhead expenses which are directly chargeable to the contract. Should such work be undertaken at the request of the CITY, reimbursement will not be required. To conform strictly with the provisions of Division 2, Part 7, Chapter 1, Article 2, of the Labor Code of the State of California. To forfeit as a penalty to CITY the sum of TWENTY-FIVE AND NO/100 DOLLARS ($25.00) for each laborer, worker, or mechanic employed by CONTRACTOR, or by any subcontractor under CONTRACTOR, in the execution of this contract, for each calendar day during which any laborer, worker, or mechanic is required or permitted to work more than eight (8) hours and who is not paid the general prevailing rate of per diem wages for holiday and overtime work in violation of the provisions of Sections 1770 to 1781 of the Labor Code of the State of California. That all sums forfeited under the provisions of the foregoing sections shall be deducted from the payments to be made under the terms of this contract.
iii. The CONTRACTOR to whom the contract is awarded shall insure that the prime and each subcontractor will in accordance with Section 1776 of the Labor Code, maintain certified payroll records. A copy of said
Local Construction Contract – MCFADDEN CONSTRUCTION, INC. – PROJECT NO. WT16008 (Updated 12/31/20)
records shall be provided with each invoice to the Public Works Department, Attention Contract Compliance Officer. It shall be the CONTRACTOR’S responsibility to obtain copies of the current prevailing wage rate determination for all subcontractors. Additionally, certified payroll records must be uploaded to the DIR website as required by labor code.
iv. The CONTRACTOR shall comply with the provisions established in Section 1777.5 of the Labor Code concerning the 1) certified approval by local joint apprenticeship committees for the employment and training of apprentices, and 2) contribution of funds to administer and conduct apprenticeship programs, if applicable to the job. e. LOCAL EMPLOYMENT ORDINANCE
Pursuant to Stockton Municipal Code Section 3.68.095 the CONTRACTOR and all subcontractors shall make a good faith effort to employ at least 50 percent of the workforce on this project from local residents, as measured by total labor work hours. Failure of any CONTRACTOR or subcontractor to comply with these requirements shall be deemed a material breach of the contract or subcontract. CONTRACTORS and subcontractors shall maintain records necessary for monitoring their compliance with section
3.68.095.
CITY agrees:
8. COMPENSATION. To pay CONTRACTOR for the work herein
contemplated in the following manner: Progress payments will be made on or about the first day of each calendar month, in such sum as shall make the aggregate of payment up to such day equal to ninety-five percent (95%) of the proportional contract price, upon the basis of the progress certificate of the Director of Public Works as to the amount of work done and the proportional amount of the contract price represented therefore; and all of the remaining part of the contract price not as aforesaid paid, shall be paid at the expiration of thirty-five (35) days from the completion of said work of construction and the certification by the Director of Public Works of such completion.
9. SECURITIES. Pursuant to Section 22300 of the Public Contract Code, CONTRACTOR will be permitted, at its request and sole expense, to substitute securities for any monies withheld by the CITY to ensure performance under the contract. Said securities will be deposited either with the CITY or with a State or federally chartered bank as escrow agent. Securities eligible for this substitution are those listed in Section 16430 of the California Government Code or bank or savings and loan certificates of deposit.
CONTRACTOR shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon.
Local Construction Contract – MCFADDEN CONSTRUCTION, INC. – PROJECT NO. WT16008 (Updated 12/31/20)
10. CHANGE ORDERS. CITY reserves the right to make such alterations, deviations, additions to or omissions from the plans and specifications, including the right to increase or decrease the quantity of any item or portion of the work, as may be deemed by the Engineer to be necessary or advisable and to require such extra work as may be determined by the Engineer to be required for the proper completion or construction of the whole work contemplated.
Any such changes will be set forth in a contract change order which will specify, in addition to the work done in connection with the change made, adjustment of contract time, if any, and the basis of compensation for such work. A contract change order will not become effective until approved by the City Manager and/or the City Council.
Processing of change orders shall be in accordance with Section 4-1.05A of the City of Stockton Standard Specifications and Plans as adopted by Council on September 27, 2016, by Resolution No. 2016-09-27-1213, effective September 27, 2016, or as otherwise amended by Council. When the compensation for an item of work is subject to adjustment under the provisions of Standard Specifications and Plans, Section 4-1.05A, CONTRACTOR shall, upon request, promptly furnish the Engineer with adequate detailed cost data for such item of work.
11. AUDITS. CITY reserves the right to periodically audit all charges made by CONTRACTOR to CITY for services under the contract. Upon request, CONTRACTOR agrees to furnish CITY, or a designated representative, with necessary information and assistance.
CONTRACTOR agrees that CITY or its delegate will have the right to review, obtain and copy all records pertaining to performance of the contract. CONTRACTOR agrees to provide CITY or its delegate with any relevant information requested and shall permit CITY or its delegate access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this requirement.
CONTRACTOR further agrees to maintain such records for a period of three (3) years after final payment under the contract.
12. WAIVER. It is expressly understood and agreed by and between the parties hereto that a waiver of any of the conditions of this contract shall not be considered a waiver of any of the other conditions thereof.
//
//
//
//
//
It is further understood and agreed by and between the parties hereto that time is of the essence of this contract in all respects.
IN WITNESS WHEREOF, the parties hereto have hereunto affixed their hands and seals the day and year first above written.
ATTEST:
ELIZA R. GARZA, CMC
CITY CLERK
By: ____________ _
APPROVED AS TO FORM & CONTENT:
LORI M. ASUNCION
OFFICE OF THE CITY ATTORNEY
By:-----------
DEPUTY CITY ATTORNEY
CITY:
By: ____________ _
HARRY BLACK
CITY MANAGER
By:_.,.,,,c;..----+-------- ;l N&-7=-Rl:JCTION, INC.
68-0412254
Tax Identification No.
Local Construction Contract - MCFADDEN CONSTRUCTION, INC. - PROJECT NO. Wf16008 (Updated 12/31 /20)
EXHIBIT 2 891
EXHIBIT A Page 11 of 34 EXHIBIT 2 892
EXHIBIT A Page 12 of 34 EXHIBIT 2 893
EXHIBIT A Page 13 of 34 EXHIBIT 2 894
EXHIBIT A Page 14 of 34 EXHIBIT 2 895
The City of Stockton is now using www.PINSAdvantage.com to track Insurance Certificates and all related documents.
The PINS system starts with The City of Stockton. A Stockton User logs into PINS and emails a request for proof of insurance to the Vendor/Contractor. The Vendor/Contractor forwards the request email to their Insurance Agent(s). The Insurance Agent(s) logs into www.PINSAdvantage.com and completes the insurance certificate online.
www.pinsadvantage.com
+ 1 626 844 1838
WHAT IS THE PROCESS?
Note: Vendors will receive the insurance request email from: [email protected] Thank you for your compliance!
01 02
03 04
The Vendor/
Contractor forwards
the email to their
insurance agent(s).
PINS notifies
The City of Stockton
that documents have
been submitted and
automatically checks
for compliance.
Agent(s) log into
PINSAdvantage.com
and complete
the insurance
certificate online
A Stockton User
logs into PINS and
emails a request for
insurance to the
Vendor/Contractor
EXHIBIT B Page 15 of 34 EXHIBIT 2 896
NOTE: The City of Stockton is now using the online insurance program PINS Advantage. Once you have been awarded a contract you will receive an email from the City’s online insurance program requesting you to forward the email to your insurance provider(s). Please see attached flyer regarding PINS Advantage.
Insurance Requirements for Construction Contracts
Contractor shall procure and maintain for the duration of the contract, and for five (5) years thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees, or subcontractors. In the event contractor fails to obtain or maintain completed operations coverage as required by this agreement, the City, at its sole discretion, may purchase the coverage required and the cost will be paid by the contractor.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $2,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
4. Surety Bonds as described below.
It shall be a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be available to the Additional Insured. Furthermore, the requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this Agreement; or (2) the broader coverage and maximum limits of coverage of any Insurance policy or proceeds available to the named insured; whichever is greater. No representation is made that the minimum insurance requirements of this agreement are sufficient to cover the obligations of the Contractor under this agreement.
EXHIBIT B Page 16 of 34 EXHIBIT 2 897
Limits of Insurance
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City of Stockton, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used). Additional insured Name of Organization shall read “City of Stockton, its officers, officials, employees, and volunteers.” Policy shall cover City of Stockton, its officers, officials, employees, and volunteers for all locations work is done under this contract.
Primary Coverage
The Additional Insured coverage under the Contractor’s policy shall be “primary and non-contributory” and will not seek contribution from the City’s insurance or selfinsurance and shall be at least as broad as CG 20 01 04 13. The City of Stockton does not accept endorsements limiting the Contractor’s insurance coverage to the sole negligence of the Named Insured.
Claims Made Policies – (Note – applicable only to professional and/or pollution liability)
If any coverage required is written on a claims-made coverage form:
1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.
EXHIBIT B Page 17 of 34 EXHIBIT 2 898
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.
4. A copy of the claims reporting requirements must be submitted to the City of Stockton for review.
5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the City of Stockton.
Waiver of Subrogation
Contractor hereby grants to City of Stockton a waiver of any right to subrogation which any insurer of said Contractor may acquire against the City of Stockton by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City of Stockton has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City of Stockton for all work performed by the Contractor, its employees, agents and subcontractors.
Self-Insured Retentions
All Self-insured retentions must be disclosed to Risk Management for approval and shall not reduce the limits of liability. The City of Stockton may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City of Stockton.
Acceptability of Insurers
EXHIBIT B Page 18 of 34 EXHIBIT 2 899
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City of Stockton.
Verification of Coverage
Contractor shall furnish the City of Stockton with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City of Stockton Risk Services before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City of Stockton reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Contractor shall, prior to the commencement of work under this Agreement, provide the City of Stockton with a copy of its declarations page(s) and endorsement page(s) for each of the required policies.
Subcontractors
Contractors shall require and verify that all subcontractors, or other parties hired for this work, purchase and maintain coverage for indemnity and insurance requirements as least as broad as specified in this agreement to the extent they apply to the scope of the subcontractor’s work with the same certificate of insurance requirements and naming as additional insureds all parties to this contract. Contractor shall include the following language in their agreement with Subcontractors: Subcontractors hired by Contractor agree to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to City under the contract documents and provide a valid certificate of insurance and the required endorsements included in the agreement as proof of compliance prior to commencement of any work and to include this same requirement for any subcontractors they hire for this work. A copy of the owner contract document indemnity and insurance provisions will be furnished to the subcontractor upon request. Contractor shall provide proof of such compliance and verification to the City upon request.
Surety Bonds
Contractor shall provide the following Surety Bonds:
1. Bid bond
2. Performance bond
EXHIBIT B Page 19 of 34 EXHIBIT 2 900
3. Payment bond (or Labor and Material bond)
4. Maintenance bond
The Payment Bond and the Performance Bond shall be in a sum equal to one hundred percent (100%) of the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.
Special Risks or Circumstances
City of Stockton reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
Certificate Holder Address
Proper address for mailing certificates, endorsements and notices shall be:
City of Stockton
Attn: City Risk Services
400 E Main Street, 3rd Floor – HR
Stockton, CA 95202
EXHIBIT B Page 20 of 34 EXHIBIT 2 901
EXHIBIT C Page 21 of 34 EXHIBIT 2 902
EXHIBIT C Page 22 of 34 EXHIBIT 2 903
EXHIBIT C Page 23 of 34 EXHIBIT 2 904
EXHIBIT C Page 24 of 34 EXHIBIT 2 905
EXHIBIT C Page 25 of 34 EXHIBIT 2 906
EXHIBIT C Page 26 of 34 EXHIBIT 2 907
EXHIBIT C Page 27 of 34 EXHIBIT 2 908
EXHIBIT C Page 28 of 34 EXHIBIT 2 909
EXHIBIT C Page 29 of 34 EXHIBIT 2 910
EXHIBIT C Page 30 of 34 EXHIBIT 2 911
EXHIBIT C Page 31 of 34 EXHIBIT 2 912
EXHIBIT C Page 32 of 34 EXHIBIT 2 913
EXHIBIT C Page 33 of 34 EXHIBIT 2 914
EXHIBIT C Page 34 of 34 EXHIBIT 2 915
1 BOND FOR LABOR AND MATERIAL
KNOW ALL MEN BY THESE PRESENTS:
That we, MCFADDEN CONSTRUCTION, INC. a STATE OF CA CORPORATION, as Principal and , a
corporation, organized and existing under the laws of the State of and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto the City of Stockton, a municipal corporation, duly created and existing under and by virtue of the laws of the State of California, and unto any and all material suppliers, persons, companies, or corporations furnishing materials, provisions, provender or other supplies used in, upon, for or about the performance of the work contemplated to be executed or performed under the contract hereinafter mentioned, and all persons, companies, or corporations renting or hiring teams, or implements of machinery, for or contributing to said work and all persons who perform work or labor upon the same, and all persons who supply both work and materials, and whose claims have not been paid by the contractor, company or corporation in the just and full sum of FIVE HUNDRED SEVENTEEN THOUSAND SIX HUNDRED EIGHTYSIX AND 50/100 DOLLARS ($517,686.50), in lawful money of the United States of America (being 100% of the contract price) for the payment whereof well and truly to be made to said CITY and to said persons jointly and severally, the said principal and Surety bind themselves, their successors and assigns, jointly and severally, firmly by these presents.
The condition of the foregoing obligations is such that the above bounden Principal has simultaneously entered into a contract of even date herewith, with the CITY, to do and perform the following work, to-wit:
NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM – TRAFFIC CIRCLES (PROJECT NO. WT16008)
NOW, THEREFORE, if the above bounden Principal, CONTRACTOR, Company or Corporation or its subcontractor, fail to pay for all materials, provisions, provender, or other supplies, or teams, used in, upon, for or about the performance of the work EXHIBIT 2 916
2 contracted to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same, in an amount not exceeding the sum specified in this bond, provided that any and all claims hereunder shall be filed and proceedings had in connection therewith as required by the provisions of Division 3, Part 4, Title 15, Chapter 5, Article 1 of the Civil Code of California, provided that in case suit is brought upon this bond, a reasonable attorney's fee shall be awarded by the Court to the prevailing party in said suit; said attorney's fee to be fixed as costs in said suit, and to be included in the judgment therein rendered.
No prepayment or delay in payment and no change, extension, addition or alteration of any provision of said contract or in said plans or specifications agreed to between the said CONTRACTOR and the said CITY and no forbearance on the part of the said CITY shall operate to relieve any surety or sureties from liability on this bond, and consent to make such alterations without further notice to or consent by any such surety is hereby given, and the said sureties hereby waive the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.
SIGNED AND SEALED on .
APPROVED AS TO SURETY: By:
PRINCIPAL
SURETY
APPROVED AS TO FORM & CONTENT:
LORI M. ASUNCION
OFFICE OF THE CITY ATTORNEY
By:
ATTORNEY-IN-FACT
By:
DEPUTY CITY ATTORNEY
EXHIBIT 2 917
3 BOND FOR FAITHFUL PERFORMANCE
KNOW ALL MEN BY THESE PRESENTS:
That we, MCFADDEN CONSTRUCTION, INC. a STATE OF CA CORPORATION, as Principal and , a
corporation, organized and existing under the laws of the State of and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto the City of Stockton, a municipal corporation, duly created and existing under and by virtue of the laws of the State of California, as obligee, in the just and full sum of FIVE HUNDRED SEVENTEEN THOUSAND SIX HUNDRED EIGHTY-SIX AND 50/100 DOLLARS ($517,686.50), in lawful money of the United States of America (being 100% of the contract price) for the payment whereof well and truly to be made to the said CITY, the said Principal and Surety bind themselves, their successors and assigns, jointly and severally, firmly by these presents.
The condition of the foregoing obligation is such that the above bounded Principal has simultaneously entered into a contract with the CITY, to do and perform the following work, to wit:
NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM – TRAFFIC CIRCLES (PROJECT NO. WT16008)
NOW, THEREFORE, if the above bounded Principal, CONTRACTOR, Company or
Corporation or its subcontractor, shall well and truly perform the work contracted to be done under said contract, then this obligation to be null and void; otherwise to remain in full force and effect.
No prepayment or delay in payment and no change, extension, addition or alteration of any provision of said contract, or in said plans or specifications agreed to between the said CONTRACTOR and the said CITY, and no forbearance on the part of the said CITY shall operate to relieve any Surety or Sureties from liability on this bond, and consent by said Surety is hereby given, and the said Surety hereby waives the EXHIBIT 2 918
4 provisions of Sections 2819 and 2845 of the Civil Code of the State of California.
SIGNED AND SEALED on
APPROVED AS TO SURETY: By:
PRINCIPAL
SURETY
APPROVED AS TO FORM & CONTENT:
LORI M. ASUNCION
OFFICE OF THE CITY ATTORNEY
By:
ATTORNEY-IN-FACT
By:
DEPUTY CITY ATTORNEY
EXHIBIT 2 919
City of Stockton
Legislation Text
File #: 22-0427, Version: 1
ADOPT RESOLUTION TO AUTHORIZE THE SAFE ROUTES TO SCHOOL PRIORITY SAFETY
PROJECT
RECOMMENDATION
It is recommended that the City Council adopt a resolution to:
1. Approve the Notice of Exemption No. NOE53-19 under the California Environmental Quality Act for the Safe Routes to School Priority Safety, Project No. WT18009.
2. Approve the plans and specifications for the Safe Routes to School Priority Safety, Project No.
WT18009.
3. Transfer funds in the amount of $600,000 from the Curb, Gutter and Sidewalk Infill, Project No.
WD18016, to the Safe Routes to School Priority Safety, Project No. WT18009.
4. Award a Construction Contract in the amount of $1,546,836.55 to George Reed, Inc. of Modesto, CA, for the Safe Routes to School Priority Safety, Project No. WT18009.
It is also recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this resolution.
Summary
The Safe Routes to School (SRTS) Priority Safety project will construct crossing improvements, including new raised medians, pedestrian refuge islands at crossings, vehicle lane reductions, curb and gutter, curb ramps, high visibility crosswalks, and other signing and striping to improve safety and accessibility for pedestrians at 10 locations near six schools throughout the City (Attachment A - Vicinity Map). The project was included in the 2018-23 Five-Year Capital Improvement Plan (CIP).
On April 14, 2022, the City received seven bids for this project. Staff recommends award of the Construction Contract to the lowest responsible bidder, George Reed, Inc. of Modesto, CA, in the amount of $1,546,836.55. Staff also recommends that Council adopt a resolution approving Notice of Exemption No. NOE53-19 under the California Environmental Quality Act (CEQA) and approving the plans and specifications for the project.
Funding for this project is from Measure K Bicycle, Pedestrian, and Safe Routes to School and Smart Growth Incentive Program, and Measure K maintenance funds. To fully fund the construction of this project, staff recommends transferring funds in the amount of $600,000 from the Curb, Gutter and Sidewalk Infill, Project No. WD18016, to the SRTS Priority Safety, Project No. WT18009.
Construction is anticipated to be completed by June 2023.
City of Stockton Page 1 of 3 Printed on 7/5/2022
powered by Legistar™
920
File #: 22-0427, Version: 1
DISCUSSION
Background
In December 2017, Public Works submitted grant applications for the Measure K Bicycle, Pedestrian, and Safe Routes to School and Smart Growth Incentive Program, Cycle 1. This program is administered by the San Joaquin Council of Governments. The SRTS Priority Safety project was one of the projects that were awarded funds to design and construct the project improvements.
On April 29, 2019, the City entered into a Professional Services Contract with CSG Consultants, Inc. to prepare the plans, specifications, and estimate for the SRTS Priority Safety, Project No. WT18009.
This project will construct crossing improvements, including new raised medians, pedestrian refuge islands at crossings, vehicle lane reductions, curb and gutter, curb ramps, high visibility crosswalks, and other signing and striping to improve safety and accessibility for pedestrians at 10 locations near six schools throughout the City (Attachment A - Vicinity Map). The project was included in the 2018- 23 Five-Year CIP, with the local match allocated from the Measure K maintenance funds.
On July 26, 2016, Council adopted a Community Workforce and Training Agreement (CWTA). The CWTA became effective August 25, 2016, and applies to all Public Works projects over $1 million that are bid after that date. On July 16, 2019, by Motion No. 2019-07-16-1403, Council extended the CWTA term to August 25, 2024. The CWTA was applied to this project as the estimated construction cost is more than $1 million.
Present Situation
On March 7, 2022, the SRTS Priority Safety, Project No. WT18009, was advertised for bids. On April 14, 2022, seven bids were received with the following results:
COMPANY NAME BID AMOUNT ADJUSTED BID AMOUNT
(local preference applied)
George Reed, Inc. $1,546,836.55 $1,546,836.55
(Modesto, CA)
United Pavement Maintenance, Inc. $1,669,748.55 $1,669,748.55 (Hughson, CA)
Dirt Dynasty, Inc. $1,712,927.35 $1,678,668.80
(Farmington, CA)
McFadden Construction, Inc. $1,784,915.90 $1,695,670.11 (Stockton, CA)
Ray’s Electric $1,806,511.18 $1,806,511.18
(Oakland, CA)
City of Stockton Page 2 of 3 Printed on 7/5/2022
powered by Legistar™
921
File #: 22-0427, Version: 1
JJR Construction, Inc. $1,834,557.40 $1,834,557.40
(San Mateo, CA)
FBD Vanguard Construction, Inc. $1,835,858.04 $1,835,858.04 (Livermore, CA)
Engineer’s Estimate $1,279,652.00
The requirements of Stockton Municipal Code (SMC) section 3.68.090, Local Business Preference, apply to this project. Application of the Local Business Preference has no effect on the bid order.
The Local Employment Ordinance, SMC section 3.68.095, also applies to this contract.
The bid from George Reed, Inc., the lowest responsible bidder, is responsive and regular in all respects. George Reed, Inc. has the proper license to perform the work. The low bid is approximately 21 percent higher than the engineer’s estimate; however, staff does not believe that re -bidding the project will result in a lower bid given the volatility of the current construction bid market.
Staff recommends Council approve the plans and specifications for the project and award a Construction Contract to George Reed, Inc. of Modesto, CA, in the amount of $1,546,836.55.
The project is in conformance with the City’s General Plan, pursuant to California Government Code, section 65402, and is categorically exempt from the requirements of CEQA as specified under Section 15301(c) of the CEQA guidelines. The activities related to this project constitute a discretionary project under the City’s jurisdiction and qualifies as a project that does not have a significant effect on the environment. The resolution will approve the filing of Notice of Exemption No. NOE53-19 under CEQA.
Construction is anticipated to be completed by June 2023.
FINANCIAL SUMMARY
The current unencumbered balance in the SRTS Priority Safety, Project No. WT18009 (formerly PW1809), Account No. 4570-714-800007-250-251-30-45-000-000, is not sufficient to award a Construction Contract to George Reed, Inc. in the amount of $1,546,836.55. With the transfer of funds in the amount of $600,000 from the Curb, Gutter and Sidewalk Infill, Project No. WD18016 (formerly PW1816), Account No. 4570-000-800007-300-000-30-45-000-000, to the SRTS Priority Safety, Project No. WT18009 (formerly PW1809), sufficient funds will be available to award a Construction Contract and fund other project administrative costs.
There is no impact to the City’s General Fund or any other unrestricted fund as a result of taking the recommended actions.
Attachment A - Vicinity Map
City of Stockton Page 3 of 3 Printed on 7/5/2022
powered by Legistar™
922
ATTACHMENT A
SAFE ROUTES TO SCHOOL PRIORITY SAFETY
(PROJECT NO. WT18009)
CITY OF STOCKTON
DEPARTMENT OF PUBLIC WORKS
PROJECT LOCATIONS:
1. LEVER BLVD
'-p 2. EIGHTH ST l1�FE�m3"15i��������Pr-h���+.:-L+-� 3. MAIN ST/BROADWAY AVE LEGEND
PROJECT ___ N
LIMITS •
VICINITY MAP I NOTTO SCALE
4. FRED RUSSO DR
5. PARK ST/AMERICAN AVE
6. PARK ST/ GRANT ST
7. OAK ST/GRANT ST
8. FREMONT ST/GRANT ST
9. LEVER BLVD/HAWAII AVE
10. LEVER BLVD/DRY CREEK WY
923
Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION APPROVING THE NOTICE OF EXEMPTION NO. NOE53-19,
APPROVING THE PLANS AND SPECIFICATIONS, TRANSFERRING FUNDING, AND
AWARDING A CONSTRUCTION CONTRACT FOR THE SAFE ROUTES TO SCHOOL PRIORITY SAFETY, PROJECT NO. WT18009
On April 14, 2022, the City Clerk of the City of Stockton opened, examined, and publicly declared the sealed proposals or bids offered for the Safe Routes to School Priority Safety, Project No. WT18009; and
The project will construct crossing improvements, including new raised medians, pedestrian refuge islands at crossings, vehicle lane reductions, curb and gutters, curb ramps, high visibility crosswalks, and other signing and striping to improve safety and accessibility for pedestrians at 10 locations near six schools throughout the City; and George Reed, Inc. is the lowest responsible bidder in the amount of $1,546,836.55, and its bid is responsive and regular in all respects; and The project is in conformance with the City’s General Plan, pursuant to California Government Code, section 65402, and is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) as specified under section 15301(c) of the CEQA Guidelines, because this is a discretionary project under the City’s jurisdiction and qualifies as a project which has been determined to not have a significant effect on the environment; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The City Council approves the filing of Notice of Exemption No. NOE53-19 under CEQA for the Safe Routes to School Priority Safety, Project No. WT18009 (formerly PW1809), attached as Exhibit 1 and incorporated herein by this reference.
2. The City Council approves the plans and specifications for the Safe Routes to School Priority Safety, Project No. WT18009 (formerly PW1809).
3. The City Council approves the transfer of funds in the amount of $600,000.00 from the Curb, Gutter and Sidewalk Infill, Project No. WD18016 (formerly PW1816), to the Safe Routes to School Priority Safety, Project No. WT18009 (formerly PW1809).
924
4. The City Council awards a Construction Contract between the City of Stockton and George Reed, Inc., in the amount of $1,546,836.55, and the City Manager is authorized and directed to execute same, attached as Exhibit 2 and incorporated herein by this reference.
5. The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED July 12, 2022 .
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
925
926
CONSTRUCTION CONTRACT
This contract is made and entered into on _____________, by and between GEORGE REED, INC., a STATE OF CALIFORNIA CORPORATION, with a business address at 140 EMPIRE AVENUE, MODESTO, CA 95354, hereinafter called "CONTRACTOR," and CITY OF STOCKTON, a municipal corporation, hereinafter called "CITY."
W I T N E S S E T H:
WHEREAS, plans and specifications for the construction of SAFE ROUTES TO SCHOOL PRIORITY SAFETY, PROJECT NO. WT18009, hereinafter called “PROJECT,” were regularly adopted by Council Resolution No. __________________, on _________________; and
WHEREAS, the contract for said work was regularly awarded to CONTRACTOR, by Council Resolution No. __________________, on ________________.
NOW, THEREFORE, in consideration of the promises and of the mutual covenants herein contained, the parties hereto expressly agree as follows:
CONTRACTOR agrees:
1. SCOPE OF SERVICES. To do the work and furnish all the labor, materials, tools, equipment, and insurance required for the construction of PROJECT in accordance with the plans and specifications adopted on _____________, by Council Resolution No. __________________ . The "contract documents," which include the bid documents, project plans, specifications, all letters of clarification, and the City of Stockton Standard Specifications and Plans, are incorporated into and made a part of this contract by this reference to the same extent as if fully set forth.
2. COMPENSATION. To do and perform the work contemplated hereby in a good and workmanlike manner and to furnish all labor, materials, tools, and equipment necessary therefore at the prices specified in Exhibit A, attached hereto and by reference made a part hereof, under the direction of and to the complete satisfaction of the Director of Public Works of the City of Stockton. Total compensation for services and reimbursement for costs shall not exceed $1,546,836.55, or as otherwise mutually agreed to in a Contract Change Order.
3. INSURANCE. CONTRACTOR shall not commence any work before obtaining, and shall maintain in force at all times during the duration and performance of this contract, the policies of insurance specified in Exhibit B, which is attached to this contract and incorporated by this reference, and as provided in the “contract documents” including Section 7-1.06 of the City of Stockton Standard Specifications and Plans as adopted on September 27, 2016, by Council Resolution No. 2016-09-27, effective September 27, 2016.
Local Construction Contract - GEORGE REED, INC. - PROJECT NO. WT18009 (Updated 12/30/20) EXHIBIT 2
It shall be a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be available to the Additional Insured.
Furthermore, the requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this Agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named Insured; whichever is greater.
The Additional Insured coverage under the CONTRACTOR’s policy shall be “primary and non-contributory” and will not seek contribution from the City of Stockton’s insurance or self-insurance and shall be at least as broad as ISO CG 20 01 04 13.
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of the City of Stockton (if agreed to in a written contract or agreement) before the City of Stockton’s own insurance or selfinsurance shall be called upon to protect it as a named insured.
All self-insured retentions (SIR) must be disclosed to the CITY’s Risk Management for approval and shall not reduce the limits of liability. Payment Bond in the amount of the self-insured retention (SIR) may be required.
Policies containing any self-insured retention (SIR) provision shall provide or be endorsed to provide that the SIR may be satisfied by either the named insured or the CITY.
The CITY reserves the right to obtain a full certified copy of any insurance policy and endorsements.
Failure to exercise this right shall not constitute a waiver of right to exercise later.
CONTRACTOR shall maintain insurance as required by this contract to the fullest amount allowed by law and shall maintain insurance for a minimum of five years following the completion of this project. In the event contractor fails to obtain or maintain completed operations coverage as required by this agreement, the City at its sole discretion may purchase the coverage required and the cost will be paid by contractor.
CONTRACTOR agrees to include with all Subcontractors in their subcontract the same requirements and provisions of this agreement including the indemnity and insurance requirements to the extent they apply to the scope of the Subcontractor’s work.
Subcontractors hired by CONTRACTOR agree to be bound to CONTRACTOR and the CITY in the same manner and to the same extent as CONTRACTOR is bound to the CITY under the Contract Documents. Subcontractor further agrees to include these same provisions with any Sub-subcontractor. A copy of the CITY Contract Document Indemnity and Insurance provisions will be furnished to the Subcontractor upon request. The General CONTRACTOR shall require all sub-contractors to provide a valid certificate of Local Construction Contract - GEORGE REED, INC. - PROJECT NO. WT18009 (Updated 12/30/20) EXHIBIT 2
insurance and the required endorsements included in the agreement prior to commencement of any work and contractor will provide proof of compliance to the City.
4. INDEMNITY AND HOLD HARMLESS. With the exception that this section shall in no event be construed to require indemnification by Contractor to a greater extent than permitted under the public policy of the State of California, Contractor shall indemnify, protect, defend with counsel approved by City and at Contractor’s sole cost and expense, and hold harmless City, its Mayor, Council, officials, representatives, agents, employees, and volunteers from and against any and all claims, causes of action, liabilities, judgments, awards, losses, liens, claims, stop notices, damages, expenses, and costs (including without limitation attorneys’ fees, expert and consultant fees, and other expenses of litigation) of every nature, including, but not limited to, death or injury to persons, or damage to property, which arise out of or are in any way connected with the work performed, materials furnished, or services provided under this Agreement, or from any violation of any federal, State, or municipal law or ordinance, or City Policy, by Contractor or Contractor’s officers, agents, employees, volunteers or subcontractors.
Contractor shall not be obligated to indemnify or defend City for claims finally determined by a court of law or arbitrator to arise from the active negligence or willful misconduct of the City. It is the intent of the Parties that this indemnity obligation is at least as broad as is permitted under California law. To the extent California Civil Code sections 2782, et seq., limit the defense or indemnity obligations of Contractor to City, the intent hereunder is to provide the maximum defense and indemnity obligations allowed by Contractor under the law. The indemnity set forth in this section shall not be limited by insurance requirements or by any other provision of this Agreement.
With exception that this section shall in no event be construed to require indemnification, including the duty to defend, by Contractor to a greater extent than permitted under the public policy of the State of California, the parties agree that Contractor’s duty to defend City is immediate and arises upon the filing of any claim against the City for damages which arise out of or are in any way connected with the work performed, materials furnished, or services provided under this Agreement by Contractor or Contractor’s officers, agents, employees, volunteers or subcontractors. Contractor’s duties and obligations to defend the City shall apply regardless of whether or not the issue of the City’s liability, breach of this Agreement, or other obligation or fault has been determined.
Contractor shall be immediately obligated to pay for City’s defense costs of the claim, including, but not limited to, court costs, attorney’s fees and costs, expert consultant and witness fees and costs, other witness fees, document reproduction costs, arbitration fees, and, if after final judgment an appeal is pursued, all of such costs for the appeal.
At the conclusion of the claim, if there is any determination or finding of sole active negligence or willful misconduct on the part of the City, City will then reimburse Contractor for amounts paid in excess of Contractor’s proportionate share of responsibility for the damages within 30 days after Contractor provides City with copies of all bills and expenses incurred in the defense of the claim(s). It is agreed between the parties that this reimbursement provision assures Contractor is not obligated to defend or indemnify City in an amount greater than provided for under California law, including, without limitation, California Civil Code sections 2782, 2782.6, and 2782.8.
Local Construction Contract - GEORGE REED, INC. - PROJECT NO. WT18009 (Updated 12/30/20) EXHIBIT 2
With the exception that this section shall in no event be construed to require indemnification by Contractor to a greater extent than permitted under the public policy of the State of California, and in addition to the other indemnity obligations in this Agreement, Contractor shall indemnify, defend, and hold harmless City, its Mayor, Council, officials, representatives, agents, employees, and volunteers from and against all claims, losses, expenses, and costs including, but not limited to, attorneys’ fees, arising out of any claim brought against the City by an employee, office, agent, or volunteer of Contractor, regardless of whether such claim may be covered by any applicable workers compensation insurance. Contractor’s indemnification obligation is not limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Contractor under workers’ compensation acts, disability acts, or other employee benefit acts.
The City’s acceptance of the insurance certificates required under this Agreement does not relieve the CONTRACTOR from its obligation under this paragraph. The indemnification obligations of this section shall survive the termination of this agreement.
Any exceptions to this language may result in a proposal being deemed non-responsive.
CONTRACTOR/Subcontractor's responsibility for such defense and indemnity obligations shall survive the termination or completion of this agreement for the full period of time allowed by law.
The defense and indemnification obligations of this agreement are undertaken in addition to, and shall not in any way be limited by, the insurance obligations contained in this agreement. If any section, subsection, sentence, clause or phrase of this indemnification is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this indemnification.
5. STANDARD PLANS AND SPECIFICATIONS. The performance of said work and the furnishing of said materials shall be executed in accordance with Section 8-1.04B of the City of Stockton Standard Specifications and Plans as adopted on September 27, 2016, by Council Resolution No. 2016-09-27-1213, effective September 27, 2016, and the provisions of the issued project specifications.
The Director of Public Works will furnish CONTRACTOR a weekly statement showing the number of days charged to the contract for the preceding week, the number of days specified for completion of the contract, and the number of days remaining to complete the contract. CONTRACTOR will be allowed one (1) week in which to file a written protest setting forth in what respects said weekly statement is incorrect, otherwise the statement shall be deemed to have been accepted by CONTRACTOR as correct.
6. WORKING DAYS. This work shall be diligently prosecuted to completion before the expiration of 80 WORKING DAYS beginning on the tenth calendar day after the date shown on the Notice to Proceed. It is agreed by the parties to the contract that in case all the work called for under the contract in all parts and requirements, is not finished or completed within the number of days as set forth, damage will be sustained by the CITY, and that it is and will be impracticable and extremely difficult to ascertain the actual damage which CITY will sustain in the event of and by reason of such delay; and Local Construction Contract - GEORGE REED, INC. - PROJECT NO. WT18009 (Updated 12/30/20) EXHIBIT 2
it is therefore agreed that CONTRACTOR will pay to CITY the sum of FOUR THOUSAND AND NO/100 DOLLARS ($4,000) per day for each and every calendar day's delay in finishing the work in excess of the number of days prescribed; and CONTRACTOR agrees to pay said liquidated damages as herein provided, and in case the same are not paid, agrees that CITY, may deduct the amount thereof from any monies due or that may become due CONTRACTOR under the contract.
It is further agreed that in case the work called for under the contract is not finished and completed in all parts and requirements within the number of days as specified, the CITY shall have the right to increase the number of days or not, as may seem best to serve the interest of CITY, and if the CITY decides to increase the said number of days, the CITY shall further have the right to charge to CONTRACTOR, CONTRACTOR's heirs, assigns or sureties, and to deduct from the final payment for the work, all or any part, as may be deemed proper, the liquidated damages as specified or the actual cost of engineering, inspection, superintendence, and other overhead expenses which are directly chargeable to the contract, and which accrue during the period of such extension, whichever is greater, except the cost of final surveys and preparation of final estimate shall not be included in such charges.
A working day shall not include, nor shall CONTRACTOR be assessed with liquidated damages nor the additional cost of engineering and inspection during any delay beyond the time named for the completion of the work caused by acts of God or of the public enemy, acts of CITY, fire, floods, epidemics, quarantine restrictions, strikes, and freight embargoes and subject to approval by the Director of Public Works, inability to get materials ordered by CONTRACTOR or subcontractor due to such causes provided that CONTRACTOR shall notify the Director of Public Works in writing of the causes of delay within five (5) working days from the beginning of any such delay, and the Director shall ascertain the facts and the extent of the delay, and Director's findings of the facts thereon shall be final and conclusive.
If CONTRACTOR is delayed by reason of alterations made in these specifications, or by any act of the Director of Public Works or of the CITY, not contemplated by the contract, the time of completion shall be extended proportionately and CONTRACTOR shall be relieved during the period of such extension of any claim for liquidated damages, engineering or inspection charges or other penalties. CONTRACTOR shall have no claim for any other compensation for any such delay.
7. CONFORMANCE TO APPLICABLE LAWS. Contractor shall comply with all applicable Federal, State, and Municipal laws, rules and ordinances. Contractor shall not discriminate in the employment of persons or in the provision of services under this Contract on the basis of any legally protected classification, including race, color, national origin, ancestry, sex or religion of such person.
Local Construction Contract - GEORGE REED, INC. - PROJECT NO. WT18009 (Updated 12/30/20) EXHIBIT 2
a. TITLE VI
Title VI of the Civil Rights Act of 1964 requires that “no person in the United States shall, on the grounds of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance.” (42 USC Section 2000d)
http://www.dol.gov/oasam/regs/statutes/titlevi.htm.
The City of Stockton requires compliance with the requirements of Title VI in all of its programs and activities regardless of funding source.
b. DISCRIMINATION AND HARASSMENT POLICY
The City of Stockton has a Discrimination and Harassment Policy (Exhibit C). The purpose of this policy is to reaffirm the CITY’s commitment to demonstrating respect for all individuals by strictly prohibiting discrimination and harassment, including sexual harassment in the workplace, to define the types of behavior and conduct prohibited by this policy, and to set forth a procedure for reporting, investigating, and resolving complaints of discrimination and harassment in the workplace.
c. LABOR STANDARDS PROVISIONS/CALIFORNIA LABOR CODE
The bidder shall understand that conditions set forth in Chapter 1, Part 7, Division 2 of the California Labor Code shall be considered part of the contract agreement.
https://leginfo.legislature.ca.gov/faces/codes_displayText.xhtml?lawCode= LAB&division=2.&title=&part=7.&chapter=1.&article=2.
d. PREVAILING WAGE
CONTRACTOR and any subcontractor shall pay each employee engaged in the trade or occupation not less than the prevailing hourly wage rate. In accordance with the provisions of Section 1770 of the Labor Code, the Director of Department of Industrial Relations of the State of California has determined the general prevailing rates of wages and employer payments for health and welfare, pension, vacation, travel time, and subsistence pay as provided for in Section 1773.1, apprenticeship or other training programs authorized by Section 3093 and similar purposes applicable to the work to be done. CONTRACTOR performing the work under this contract shall obtain a copy of the wage rate determination and shall distribute copies to each subcontractor. As the wage determination for each craft reflects an expiration date, it shall be the prime CONTRACTOR and each subcontractor's responsibility to ensure that the prevailing wage rates of concern is current and paid to the employee.
Local Construction Contract - GEORGE REED, INC. - PROJECT NO. WT18009 (Updated 12/30/20) EXHIBIT 2
i. The CONTRACTOR performing the work shall be responsible for obtaining a copy of the State wage rate determination. State wage rates may be obtained at
http://www.dir.ca.gov/OPRL/pwd/Determinations/Northern/Northern.p df. The CONTRACTOR shall be responsible for posting said wage rates at a prominent location at the work site and shall maintain same in a good readable condition for the duration of the work. ii. Should the CONTRACTOR choose to work on a Saturday, Sunday or on a holiday recognized by the Labor Unions, the CONTRACTOR shall reimburse the CITY the actual cost of engineering, inspection, superintendence, and or other overhead expenses which are directly chargeable to the contract. Should such work be undertaken at the request of the CITY, reimbursement will not be required. To conform strictly with the provisions of Division 2, Part 7, Chapter 1, Article 2, of the Labor Code of the State of California. To forfeit as a penalty to CITY the sum of TWENTY-FIVE AND NO/100 DOLLARS ($25.00) for each laborer, worker, or mechanic employed by CONTRACTOR, or by any subcontractor under CONTRACTOR, in the execution of this contract, for each calendar day during which any laborer, worker, or mechanic is required or permitted to work more than eight (8) hours and who is not paid the general prevailing rate of per diem wages for holiday and overtime work in violation of the provisions of Sections 1770 to 1781 of the Labor Code of the State of California. That all sums forfeited under the provisions of the foregoing sections shall be deducted from the payments to be made under the terms of this contract.
iii. The CONTRACTOR to whom the contract is awarded shall insure that the prime and each subcontractor will in accordance with Section 1776 of the Labor Code, maintain certified payroll records. A copy of said records shall be provided with each invoice to the Public Works Department, Attention Contract Compliance Officer. It shall be the CONTRACTOR’S responsibility to obtain copies of the current prevailing wage rate determination for all subcontractors. Additionally, certified payroll records must be uploaded to the DIR website as required by labor code.
iv. The CONTRACTOR shall comply with the provisions established in Section 1777.5 of the Labor Code concerning the 1) certified approval by local joint apprenticeship committees for the employment and training of apprentices, and 2) contribution of funds to administer and conduct apprenticeship programs, if applicable to the job.
Local Construction Contract - GEORGE REED, INC. - PROJECT NO. WT18009 (Updated 12/30/20) EXHIBIT 2
e. LOCAL EMPLOYMENT ORDINANCE
Pursuant to Stockton Municipal Code Section 3.68.095 the CONTRACTOR and all subcontractors shall make a good faith effort to employ at least 50 percent of the workforce on this project from local residents, as measured by total labor work hours. Failure of any CONTRACTOR or subcontractor to comply with these requirements shall be deemed a material breach of the contract or subcontract. CONTRACTORS and subcontractors shall maintain records necessary for monitoring their compliance with section
3.68.095.
f. COMMUNITY WORKFORCE TRAINING AGREEMENT
Pursuant to the implementation of the Community Workforce Training Agreement (CWTA) adopted by the City Council on July 26, 2016, the successful bidder shall be required to comply with the provisions of CWTA. For any project subject to this Agreement, the Local Hire, Priority Apprentice and Workforce Development Program requirements shall apply in lieu of the requirements of Stockton Municipal Code Section 3.68.095 and no separate compliance with Section 3.68.095 will be required of the Contractors/Employers working on the project (EXHIBIT D).
CITY agrees:
8. COMPENSATION. To pay CONTRACTOR for the work herein
contemplated in the following manner: Progress payments will be made on or about the first day of each calendar month, in such sum as shall make the aggregate of payment up to such day equal to ninety-five percent (95%) of the proportional contract price, upon the basis of the progress certificate of the Director of Public Works as to the amount of work done and the proportional amount of the contract price represented therefore; and all of the remaining part of the contract price not as aforesaid paid, shall be paid at the expiration of thirty-five (35) days from the completion of said work of construction and the certification by the Director of Public Works of such completion.
9. SECURITIES. Pursuant to Section 22300 of the Public Contract Code, CONTRACTOR will be permitted, at its request and sole expense, to substitute securities for any monies withheld by the CITY to ensure performance under the contract. Said securities will be deposited either with the CITY or with a State or federally chartered bank as escrow agent. Securities eligible for this substitution are those listed in Section 16430 of the California Government Code or bank or savings and loan certificates of deposit.
CONTRACTOR shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon.
Local Construction Contract - GEORGE REED, INC. - PROJECT NO. WT18009 (Updated 12/30/20) EXHIBIT 2
10. CHANGE ORDERS. CITY reserves the right to make such alterations, deviations, additions to or omissions from the plans and specifications, including the right to increase or decrease the quantity of any item or portion of the work, as may be deemed by the Engineer to be necessary or advisable and to require such extra work as may be determined by the Engineer to be required for the proper completion or construction of the whole work contemplated.
Any such changes will be set forth in a contract change order which will specify, in addition to the work done in connection with the change made, adjustment of contract time, if any, and the basis of compensation for such work. A contract change order will not become effective until approved by the City Manager and/or the City Council.
Processing of change orders shall be in accordance with Section 4-1.05A of the City of Stockton Standard Specifications and Plans as adopted by Council on September 27, 2016, by Resolution No. 2016-09-27-1213, effective September 27, 2016, or as otherwise amended by Council. When the compensation for an item of work is subject to adjustment under the provisions of Standard Specifications and Plans, Section 4-1.05A, CONTRACTOR shall, upon request, promptly furnish the Engineer with adequate detailed cost data for such item of work.
11. AUDITS. CITY reserves the right to periodically audit all charges made by CONTRACTOR to CITY for services under the contract. Upon request, CONTRACTOR agrees to furnish CITY, or a designated representative, with necessary information and assistance.
CONTRACTOR agrees that CITY or its delegate will have the right to review, obtain and copy all records pertaining to performance of the contract. CONTRACTOR agrees to provide CITY or its delegate with any relevant information requested and shall permit CITY or its delegate access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this requirement.
CONTRACTOR further agrees to maintain such records for a period of three (3) years after final payment under the contract.
12. WAIVER. It is expressly understood and agreed by and between the parties hereto that a waiver of any of the conditions of this contract shall not be considered a waiver of any of the other conditions thereof.
It is further understood and agreed by and between the parties hereto that time is of the essence of this contract in all respects.
Local Construction Contract - GEORGE REED, INC. - PROJECT NO. WT18009 (Updated 12/30/20) EXHIBIT 2
EXHIBIT 2 936
EXHIBIT 2
EXHIBIT A Page 11 of 54 937
EXHIBIT 2
EXHIBIT A Page 12 of 54 938
EXHIBIT 2
EXHIBIT A Page 13 of 54 939
The City of Stockton is now using www.PINSAdvantage.com to track Insurance Certificates and all related documents.
The PINS system starts with The City of Stockton. A Stockton User logs into PINS and emails a request for proof of insurance to the Vendor/Contractor. The Vendor/Contractor forwards the request email to their Insurance Agent(s). The Insurance Agent(s) logs into www.PINSAdvantage.com and completes the insurance certificate online.
www.pinsadvantage.com
+ 1 626 844 1838
WHAT IS THE PROCESS?
Note: Vendors will receive the insurance request email from: [email protected] Thank you for your compliance!
01 02
03 04
The Vendor/
Contractor forwards
the email to their
insurance agent(s).
PINS notifies
The City of Stockton
that documents have
been submitted and
automatically checks
for compliance.
Agent(s) log into
PINSAdvantage.com
and complete
the insurance
certificate online
A Stockton User
logs into PINS and
emails a request for
insurance to the
Vendor/Contractor
EXHIBIT 2
EXHIBIT B Page 14 of 54 940
NOTE: The City of Stockton is now using the online insurance program PINS Advantage. Once you have been awarded a contract you will receive an email from the City’s online insurance program requesting you to forward the email to your insurance provider(s). Please see attached flyer regarding PINS Advantage.
Insurance Requirements for Construction Contracts
Contractor shall procure and maintain for the duration of the contract, and for five (5) years thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees, or subcontractors. In the event contractor fails to obtain or maintain completed operations coverage as required by this agreement, the City, at its sole discretion, may purchase the coverage required and the cost will be paid by the contractor.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $5,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
5. Surety Bonds as described below.
It shall be a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be available to the Additional Insured. Furthermore, the requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this Agreement; or (2) the broader coverage and maximum limits of coverage of any Insurance policy or proceeds available to the named insured; whichever is greater. No representation is made that the minimum insurance requirements of this agreement are sufficient to cover the obligations of the Contractor under this agreement.
EXHIBIT 2
EXHIBIT B Page 15 of 54 941
Limits of Insurance
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City of Stockton, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used). Additional insured Name of Organization shall read “City of Stockton, its officers, officials, employees, and volunteers.” Policy shall cover City of Stockton, its officers, officials, employees, and volunteers for all locations work is done under this contract.
Primary Coverage
The Additional Insured coverage under the Contractor’s policy shall be “primary and non-contributory” and will not seek contribution from the City’s insurance or selfinsurance and shall be at least as broad as CG 20 01 04 13. The City of Stockton does not accept endorsements limiting the Contractor’s insurance coverage to the sole negligence of the Named Insured.
Builder’s Risk (Course of Construction) Insurance
Contractor may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City of Stockton as a loss payee as their interest may appear.
If the project does not involve new or major reconstruction, at the option of the City of Stockton, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, EXHIBIT 2
EXHIBIT B Page 16 of 54 942
modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City of Stockton’s site.
Claims Made Policies – (Note – applicable only to professional and/or pollution liability)
If any coverage required is written on a claims-made coverage form:
1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.
4. A copy of the claims reporting requirements must be submitted to the City of Stockton for review.
5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the City of Stockton.
Waiver of Subrogation
Contractor hereby grants to City of Stockton a waiver of any right to subrogation which any insurer of said Contractor may acquire against the City of Stockton by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City of Stockton has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation EXHIBIT 2
EXHIBIT B Page 17 of 54 943
policy shall be endorsed with a waiver of subrogation in favor of the City of Stockton for all work performed by the Contractor, its employees, agents and subcontractors.
Self-Insured Retentions
All Self-insured retentions must be disclosed to Risk Management for approval and shall not reduce the limits of liability. The City of Stockton may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City of Stockton.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City of Stockton.
Verification of Coverage
Contractor shall furnish the City of Stockton with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City of Stockton Risk Services before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City of Stockton reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Contractor shall, prior to the commencement of work under this Agreement, provide the City of Stockton with a copy of its declarations page(s) and endorsement page(s) for each of the required policies.
Subcontractors
Contractors shall require and verify that all subcontractors, or other parties hired for this work, purchase and maintain coverage for indemnity and insurance requirements as least as broad as specified in this agreement to the extent they apply to the scope of the subcontractor’s work with the same certificate of insurance requirements and naming as additional insureds all parties to this contract. Contractor shall include the following language in their agreement with Subcontractors: Subcontractors hired by Contractor agree to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to City under the contract documents and provide a valid certificate of insurance and the required endorsements included in the agreement EXHIBIT 2
EXHIBIT B Page 18 of 54 944
as proof of compliance prior to commencement of any work and to include this same requirement for any subcontractors they hire for this work. A copy of the owner contract document indemnity and insurance provisions will be furnished to the subcontractor upon request. Contractor shall provide proof of such compliance and verification to the City upon request.
Surety Bonds
Contractor shall provide the following Surety Bonds:
1. Bid bond
2. Performance bond
3. Payment bond (or Labor and Material bond)
4. Maintenance bond
The Payment Bond and the Performance Bond shall be in a sum equal to one hundred percent (100%) of the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.
Special Risks or Circumstances
City of Stockton reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
Certificate Holder Address
Proper address for mailing certificates, endorsements and notices shall be:
City of Stockton
Attn: City Risk Services
400 E Main Street, 3rd Floor – HR
Stockton, CA 95202
EXHIBIT 2
EXHIBIT B Page 19 of 54 945
EXHIBIT 2
EXHIBIT C Page 20 of 54 946
EXHIBIT 2
EXHIBIT C Page 21 of 54 947
EXHIBIT 2
EXHIBIT C Page 22 of 54 948
EXHIBIT 2
EXHIBIT C Page 23 of 54 949
EXHIBIT 2
EXHIBIT C Page 24 of 54 950
EXHIBIT 2
EXHIBIT C Page 25 of 54 951
EXHIBIT 2
EXHIBIT C Page 26 of 54 952
EXHIBIT 2
EXHIBIT C Page 27 of 54 953
EXHIBIT 2
EXHIBIT C Page 28 of 54 954
EXHIBIT 2
EXHIBIT C Page 29 of 54 955
EXHIBIT 2
EXHIBIT C Page 30 of 54 956
EXHIBIT 2
EXHIBIT C Page 31 of 54 957
EXHIBIT 2
EXHIBIT C Page 32 of 54 958
EXHIBIT 2
EXHIBIT C Page 33 of 54 959
3 EXHIBIT 2
EXHIBIT D Page 34 of 54 960
4 EXHIBIT 2
EXHIBIT D Page 35 of 54 961
5 EXHIBIT 2
EXHIBIT D Page 36 of 54 962
6 EXHIBIT 2
EXHIBIT D Page 37 of 54 963
7 EXHIBIT 2
EXHIBIT D Page 38 of 54 964
8 EXHIBIT 2
EXHIBIT D Page 39 of 54 965
9 EXHIBIT 2
EXHIBIT D Page 40 of 54 966
10 EXHIBIT 2
EXHIBIT D Page 41 of 54 967
11 EXHIBIT 2
EXHIBIT D Page 42 of 54 968
12 EXHIBIT 2
EXHIBIT D Page 43 of 54 969
13 EXHIBIT 2
EXHIBIT D Page 44 of 54 970
14 EXHIBIT 2
EXHIBIT D Page 45 of 54 971
15 EXHIBIT 2
EXHIBIT D Page 46 of 54 972
16 EXHIBIT 2
EXHIBIT D Page 47 of 54 973
17 EXHIBIT 2
EXHIBIT D Page 48 of 54 974
18 EXHIBIT 2
EXHIBIT D Page 49 of 54 975
19 EXHIBIT 2
EXHIBIT D Page 50 of 54 976
20 EXHIBIT 2
EXHIBIT D Page 51 of 54 977
21 EXHIBIT 2
EXHIBIT D Page 52 of 54 978
22 EXHIBIT 2
EXHIBIT D Page 53 of 54 979
23 EXHIBIT 2
EXHIBIT D Page 54 of 54 980
BOND FOR FAITHFUL PERFORMANCE
KNOW ALL MEN BY THESE PRESENTS:
That we, _______________________________, a STATE OF CALIFORNIA CORPORATION, as Principal and ,
a corporation, organized and existing under the laws of the State of and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto the City of Stockton, a municipal corporation, duly created and existing under and by virtue of the laws of the State of California, as obligee, in the just and full sum of ONE MILLION FIVE HUNDRED FORTY-SIX EIGHT HUNDRED THIRTY-SIX AND 55/100 DOLLARS ($1,546,836.55), in lawful money of the United States of America (being 100% of the contract price) for the payment whereof well and truly to be made to the said CITY, the said Principal and Surety bind themselves, their successors and assigns, jointly and severally, firmly by these presents.
The condition of the foregoing obligation is such that the above bounded Principal has simultaneously entered into a contract with the CITY, to do and perform the following work, to wit:
SAFE ROUTES TO SCHOOL PRIORITY SAFETY
PROJECT NO. WT18009
NOW, THEREFORE, if the above bounded Principal, CONTRACTOR, Company or Corporation or its subcontractor, shall well and truly perform the work contracted to be done under said contract, then this obligation to be null and void; otherwise, to remain in full force and effect.
No prepayment or delay in payment and no change, extension, addition or alteration of any provision of said contract, or in said plans or specifications agreed to between the said CONTRACTOR and the said CITY, and no forbearance on the part of the said CITY shall operate to relieve any Surety or Sureties from liability on this bond, and consent by said Surety is hereby given, and the said Surety hereby waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California. 1 EXHIBIT 2
981
SIGNED AND SEALED on
APPROVED AS TO SURETY: By:
PRINCIPAL
SURETY
APPROVED AS TO FORM & CONTENT:
LORI M. ASUNCION
OFFICE OF THE CITY ATTORNEY
By:
ATTORNEY-IN-FACT
By:
ACTING CITY ATTORNEY
2 EXHIBIT 2
982
BOND FOR LABOR AND MATERIAL
KNOW ALL MEN BY THESE PRESENTS:
That we, GEORGE REED, INC., a STATE OF CALIFORNIA CORPORATION, with a business address at 140 EMPIRE AVENUE, MODESTO, CA 95354, as Principal and , corporation, organized and existing under the laws of the State of and duly authorized to transact business under the laws of the State of California, as Surety, are held and firmly bound unto the City of Stockton, a municipal corporation, duly created and existing under and by virtue of the laws of the State of California, and unto any and all material suppliers, persons, companies, or corporations furnishing materials, provisions, provender or other supplies used in, upon, for or about the performance of the work contemplated to be executed or performed under the contract hereinafter mentioned, and all persons, companies, or corporations renting or hiring teams, or implements of machinery, for or contributing to said work and all persons who perform work or labor upon the same, and all persons who supply both work and materials, and whose claims have not been paid by the contractor, company or corporation in the just and full sum of ONE MILLION FIVE HUNDRED FORTY-SIX EIGHT HUNDRED THIRTY-SIX AND 55/100 DOLLARS ($1,546,836.55), in lawful money of the United States of America (being 100% of the contract price) for the payment whereof well and truly to be made to said CITY and to said persons jointly and severally, the said principal and Surety bind themselves, their successors and assigns, jointly and severally, firmly by these presents.
The condition of the foregoing obligations is such that the above bounden Principal has simultaneously entered into a contract of even date herewith, with the CITY, to do and perform the following work, to-wit:
SAFE ROUTES TO SCHOOL PRIORITY SAFETY
PROJECT NO. WT18009
NOW, THEREFORE, if the above bounden Principal, CONTRACTOR, Company or Corporation or its subcontractor, fail to pay for all materials, provisions, provender, or 1 EXHIBIT 2
983
other supplies, or teams, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same, in an amount not exceeding the sum specified in this bond, provided that any and all claims hereunder shall be filed and proceedings had in connection therewith as required by the provisions of Division 3, Part 4, Title 15, Chapter 5, Article 1 of the Civil Code of California, provided that in case suit is brought upon this bond, a reasonable attorney's fee shall be awarded by the Court to the prevailing party in said suit; said attorney's fee to be fixed as costs in said suit, and to be included in the judgment therein rendered.
No prepayment or delay in payment and no change, extension, addition or alteration of any provision of said contract or in said plans or specifications agreed to between the said CONTRACTOR and the said CITY and no forbearance on the part of the said CITY shall operate to relieve any surety or sureties from liability on this bond, and consent to make such alterations without further notice to or consent by any such surety is hereby given, and the said sureties hereby waive the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.
SIGNED AND SEALED on .
APPROVED AS TO SURETY: By:
PRINCIPAL
SURETY
APPROVED AS TO FORM & CONTENT:
LORI M. ASUNCION
OFFICE OF THE CITY ATTORNEY
By:
ATTORNEY-IN-FACT
By:
ACTING CITY ATTORNEY
2 EXHIBIT 2
984
City of Stockton
Legislation Text
File #: 22-0428, Version: 1
ADOPT RESOLUTION TO AUTHORIZE THE BEAR CREEK AND PIXLEY SLOUGH BICYCLE
AND PEDESTRIAN PATH PROJECT
RECOMMENDATION
It is recommended that the City Council adopt a resolution to:
1. Approve the Notice of Exemption No. NOE17-21 under the California Environmental Quality Act for the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No.
WT17002/Federal Project No. CML-5008(175).
2. Approve the plans and specifications for the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002/Federal Project No. CML-5008(175).
3. Appropriate funds in the amount of $1,000,000 from the Public Facilities Fees Air Quality Fund Balance to the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No.
WT17002/Federal Project No. CML-5008(175).
4. Appropriate funds in the amount of $770,000 from the Public Facilities Fees Street Improvement Fund Balance to the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002/Federal Project No. CML-5008(175).
5. Award a Construction Contract in the amount of $2,555,031 to Dirt Dynasty, Inc. of Farmington, CA, for the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002/Federal Project No. CML-5008(175).
It is also recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this resolution.
Summary
The Bear Creek and Pixley Slough Bicycle and Pedestrian Path project will enhance the existing bicycle and pedestrian path along Bear Creek and Pixley Slough between Thornton Road and Davis Road. The project will also install rectangular rapid flashing beacons at four roadway crossings; upgrade bicycle and pedestrian pavement signage and markings; upgrade wheelchair ramps to meet Americans with Disabilities Act (ADA) standards; and widen the roadway shoulders along Eight Mile Road between Lower Sacramento Road and Thornton Road, and Lower Sacramento Road between Bear Creek and Eight Mile Road to accommodate bicyclists (Attachment A - Vicinity Map). The project was included in the 2017-22 Five-Year Capital Improvement Plan (CIP).
On March 17, 2022, the City received two bids for this project. Staff recommends award of the City of Stockton Page 1 of 4 Printed on 7/5/2022
powered by Legistar™
985
File #: 22-0428, Version: 1
Construction Contract to the lowest responsible bidder, Dirt Dynasty, Inc., in the amount of $2,555,031. Staff also recommends that Council adopt a resolution approving Notice of Exemption No. NOE17-21 under the California Environmental Quality Act (CEQA) and approving the plans and specifications for the project.
The project is funded by the federal Congestion Mitigation Air Quality (CMAQ) program and Measure K funds. To fully fund the construction of the project, staff recommends transferring funds in the total amount of $1,770,000 from the Public Facilities Fees (PFF) Air Quality and Street Improvement Fund Balances to the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No.
WT17002/Federal Project No. CML-5008(175). Construction is anticipated to be completed by spring 2023.
This project is federally funded and is subject to federal Disadvantaged Business Enterprise (DBE) requirements.
DISCUSSION
Background
On November 3, 2016, the San Joaquin Council of Governments (SJCOG) solicited a call for projects for the CMAQ program. Approximately $29.4 million was available for eligible projects in San Joaquin County to be programmed in FY 2018-19, 2019-20, and 2020-21. CMAQ funds are available for transportation projects and programs that contribute to the attainment or maintenance of National Ambient Air Quality Standards. The minimum local match for the CMAQ program is 11.47 percent. In January 2017, the City submitted several CMAQ grant applications, including the Bear Creek and Pixley Slough Bicycle and Pedestrian Path project in the amount of $1,727,110. On March 23, 2017, the project was awarded $1,529,010 in CMAQ federal funds. A local match in the amount of $198,100 was funded from Measure K. The project was included in the 2017-22 Five-Year CIP.
The Bear Creek and Pixley Slough Bicycle and Pedestrian Path project will enhance the existing bicycle and pedestrian path along Bear Creek and Pixley Slough between Thornton Road and Davis Road. The project will also install rectangular rapid flashing beacons at four roadway crossings (Thornton Road/Bear Creek, Davis Road/Bear Creek, Whistler Way/Pixley Slough, and Rivermont Drive/Pixley Slough); upgrade bicycle and pedestrian pavement signage and markings; upgrade wheelchair ramps to meet ADA standards; and widen the roadway shoulders along Eight Mile Road between Lower Sacramento Road and Thornton Road, and Lower Sacramento Road between Bear Creek and Eight Mile Road to accommodate bicyclists (Attachment A - Vicinity Map).
Since the project is funded with federal transportation dollars, DBE program rules apply. DBE rules require that the prime contractor either meet a calculated project specific DBE participation goal or undertake and document good faith efforts to do so. If the apparent low bidder does not meet the project goal, a Good Faith Efforts Evaluation must be made examining several specific factors.
Failure to meet the goal or provide evidence of adequate good faith efforts are grounds for rejecting the bidder as non-responsive.
A DBE is a socially and economically disadvantaged small business owned by a woman or by a specified ethnic group that has been properly certified by Caltrans. These groups include:
City of Stockton Page 2 of 4 Printed on 7/5/2022
powered by Legistar™
986
File #: 22-0428, Version: 1
· African American
· Asian Pacific American
· Native American
· Women
· Hispanic American
· Subcontinent Asian American
A DBE goal of 14 percent was established for this project. The goal was calculated by examining the breakdown of the types of work to be performed and the availability of certified DBE companies in our market area to perform the work. A non-mandatory pre-bid meeting was held on February 15, 2022, to emphasize the DBE requirements and to provide information on how to meet the project DBE goal.
The federal funding restrictions prohibit the use of the Local Employment Ordinance (Stockton Municipal Code (SMC) section 3.68.095) and the Local Business Preference Ordinance (SMC section 3.68.090).
On July 26, 2016, Council adopted a Community Workforce and Training Agreement (CWTA). The CWTA became effective August 25, 2016, and applies to all Public Works projects over $1 million that are bid after that date. On July 16, 2019, by Motion No. 2019-07-16-1403, Council extended the CWTA term to August 25, 2024. The CWTA was not applied to this project as federal regulations prohibit the use of such agreements.
Present Situation
On February 8, 2022, the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No.
WT17002/Federal Project No. CML-5008(175), was advertised for bids.
On March 17, 2022, two bids were received with the following results:
COMPANY NAME BID AMOUNT
Dirt Dynasty, Inc. (Farmington, CA) $2,555,031
Ray’s Electric, Inc. (Oakland, CA) $2,718,834
Engineer’s Estimate $2,218,770
The bid from Dirt Dynasty, Inc., the lowest responsible bidder, is regular in all respects. Dirt Dynasty, Inc. has the proper license to perform the work and has proposed a DBE participation of 60.34 percent, which exceeds the 14 percent DBE goal.
The low bid is approximately 15 percent higher than the engineer’s estimate. However, staff does not believe that re-bidding the project would result in a lower bid given the volatility of the current construction market. Staff recommends Council approve the plans and specifications for the project and award a Construction Contract for the base bid to Dirt Dynasty, Inc. of Farmington, CA, in the amount of $2,555,031.
City of Stockton Page 3 of 4 Printed on 7/5/2022
powered by Legistar™
987
File #: 22-0428, Version: 1
Caltrans National Environmental Policy Act determination was received on April 6, 2020. The State determined that the project is a Categorical Exclusion under 23 CFR 771.117(c): activity (c)(26).
Similarly, the project is in conformance with the City’s General Plan, pursuant to California Government Code section 65402, and is categorically exempt from the requirements of CEQA as specified under Section 15301(c) of the CEQA guidelines. The activities related to this project constitute a discretionary project under the City’s jurisdiction and qualifies as a project that does not have a significant effect on the environment. The resolution will approve the filing of Notice of Exemption No. NOE17-21 under CEQA.
Construction is anticipated to be completed by spring 2023.
FINANCIAL SUMMARY
The current unencumbered balance in the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002 (formerly PW1702)/Federal Project No. CML-5008(175), 4570-000- 800007-300-000-30-45-000-000, is not sufficient to award a Construction Contract to Dirty Dynasty, Inc. in the amount of $2,555,031.
The resolution includes the following actions to provide sufficient funding to award a Construction Contract:
1. Appropriate funds in the amount of $1,000,000 from the PFF Air Quality Fund Balance, Account No. 0000-000-390000-310-322-00-00-000-000, to the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002 (formerly PW1702)/Federal Project No.
CML-5008(175), Account No. 4570-000-800007-300-000-30-45-000-000.
2. Appropriate funds in the amount of $770,00 from the PFF Street Improvement Fund Balance, Account No. 0000-000-390000-310-312-00-00-000-000, to the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002 (formerly PW1702)/Federal Project No.
CML-5008(175), Account No. 4570-000-800007-300-000-30-45-000-000.
There is no impact to the City’s General Fund or any other unrestricted fund as a result of taking the recommended actions.
Attachment A - Vicinity Map
City of Stockton Page 4 of 4 Printed on 7/5/2022
powered by Legistar™
988
^:K'ϮϬϭϲD
Y
WZK:
d>Kd/KEDW
EŽƚƚŽ^ĐĂůĞ
tŝĚĞŶ^ŚŽƵůĚĞƌĂŶĚZĞͲƐƚƌŝƉĞ
ATTACHMENT A 989
Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION APPROVING THE NOTICE OF EXEMPTION NO. NOE17-21,
APPROVING THE PLANS AND SPECIFICATIONS, APPROPRIATING FUNDING,
AND AWARDING A CONSTRUCTION CONTRACT FOR THE BEAR CREEK AND PIXLEY SLOUGH BICYCLE AND PEDESTRIAN PATH, PROJECT NO.
WT17002/FEDERAL PROJECT NO. CML-5008(175)
On March 17, 2022, the City Clerk of the City of Stockton opened, examined, and publicly declared the sealed proposals or bids offered for the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002/Federal Project No.
CML-5008(175); and
The project will enhance the existing bicycle and pedestrian path along Bear Creek and Pixley Slough between Thornton Road and Davis Road. The project will also install rectangular rapid flashing beacons at four roadway crossings; upgrade bicycle and pedestrian pavement signage and markings; upgrade wheelchair ramps to meet Americans with Disabilities Act standards; and widen the roadway shoulders along Eight Mile Road between Lower Sacramento Road and Thornton Road, and Lower Sacramento Road between Bear Creek and Eight Mile Road to accommodate bicyclists; and Dirt Dynasty, Inc. is the lowest responsible bidder in the amount of $2,555,031, and its bid is regular in all respects; and
Caltrans National Environmental Policy Act determination was received on April 6, 2020. The State determined that the project is a Categorical Exclusion under 23 CFR 771.117(c): activity (c)(26). Similarly, the project is in conformance with the City’s General Plan, pursuant to California Government Code section 65402; and The project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) as specified under section 15301(c) of the CEQA Guidelines, because this is a discretionary project under the City’s jurisdiction and qualifies as a project which has been determined to not have a significant effect on the environment; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The City Council approves the filing of Notice of Exemption No. NOE17-21 under CEQA for the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002 (formerly PW1702)/Federal Project No. CML-5008(175), a copy of which is attached as Exhibit 1 and incorporated herein by this reference. 990
2. The City Council approves the plans and specifications for the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002 (formerly PW1702)/Federal Project No. CML-5008(175).
3. The City Council approves the appropriation of funds in the amount of $1,000,000 from the Public Facilities Fees Air Quality Fund Balance to the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002 (formerly PW1702)/Federal Project No. CML-5008(175).
4. The City Council approves the appropriation of funds in the amount of $770,000 from the Public Facilities Fees Street Improvement Fund Balance to the Bear Creek and Pixley Slough Bicycle and Pedestrian Path, Project No. WT17002 (formerly PW1702)/Federal Project No. CML-5008(175).
5. The City Council awards a Construction Contract between the City of Stockton and Dirt Dynasty, Inc., in the amount of $2,555,031, and the City Manager is authorized and directed to execute same, a copy of which is attached as Exhibit 2 and incorporated herein by this reference.
6. The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED July 12, 2022 .
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
991
CITY OF STOCKTON
NOTICE OF EXEMPTION
TO: COUNTY CLERK FROM: Lead Agency
COUNTY OF SAN JOAQUIN
44 N. San Joaquin Street, Suite 260
Stockton, CA 95202
City of Stockton
Public Works Department
22 E. Weber Avenue, Room 301
Stockton, CA 95202
NOTICE OF EXEMPTION PURSUANT TO PUBLIC RESOURCES CODE SECTION 21152(B) AND CALIFORNIA CODE OF REGULATIONS TITLE 14, SECTION 15062
PROJECT DATA
Project Title: Bear Creek and Pixley Slough Bicycle and Pedestrian Path CEQA Exemption File No.: NOE17-21
Applicant: City of Stockton, Public Works Department
Project Description/Location: The City of Stockton’s Public Works Department is proposing to install and upgrade various bicycle facilities along Thornton Road, Eight Mile Road and Lower Sacramento Road. Project will also install rapid flashing beacons at various intersections and a hawk signal at Thornton Road.
DETERMINATION/FINDING OF EXEMPTION
The above-described activity/project is exempt from the environmental assessment requirements of the California Environmental Quality Act (CEQA) pursuant to the following section(s) of the State CEQA Guidelines (California Code of Regulations, Title 14):
The activity is not a "project" as defined in CEQA Guidelines Section 15378.
The activity is exempt under the "general rule" at CEQA Guidelines Section1 5061(B)(3).
The project is "Statutorily Exempt" per CEQA Guidelines Section: __________ X The project is "Categorically Exempt" per CEQA Guidelines Section 15301(c).
BASIS FOR FINDING OF EXEMPTION
The activity does not qualify as a project and/or clearly could not have a significant effect on the environment and, therefore, CEQA does not apply.
X The activity constitutes a discretionary project under the City's jurisdiction and qualifies as a project which has been determined not to have a significant effect on the environment and, therefore, is exempt from the provisions of CEQA under the above-noted statutory or categorical exemption(s).
JODI ALMASSY, DIRECTOR March 23, 2021
PUBLIC WORKS DEPARTMENT (DATE OF PREPARATION)
By
ROSA ALVAREZ, PROGRAM ENGINEER (DATE OF FINAL APPROVAL) _____________________________________________________________________________________________
AFFIDAVIT OF FILING AND POSTING
I declare that on the date stamped above, I received and posted this notice or included it on a list of such notices which was posted as required by California Public Resources Code Section 21152(B). Said notice or list of notices will remain posted for 35 days from the filing date.
_________________________________________ _________________________________________ Signature Title
_________________________________________
Posting Period Ending Date
EXHIBIT 1 992
Federal Construction Contract – DIRT DYNASTY, INC. – PROJECT NO. CML-5008(175) (Updated 12/30/20)
CONSTRUCTION CONTRACT
This contract is made and entered into on ______________, by and between DIRT DYNASTY, INC., a STATE OF CA CORPORATION, with a business address at P. O. BOX 67, FARMINGTON, CA 95230, hereinafter called "CONTRACTOR," and CITY OF STOCKTON, a municipal corporation, hereinafter called "CITY." W I T N E S S E T H:
WHEREAS, plans and specifications for the construction of BEAR CREEK AND PIXLEY SLOUGH BICYCLE AND PEDESTRIAN PATH (PROJECT NO.
WT17002/FEDERAL PROJECT NO. CML-5008(175)), hereinafter called “PROJECT,” were regularly adopted by Council Resolution No. __________________, on _________________; and
WHEREAS, the contract for said work was regularly awarded to CONTRACTOR, by Council Resolution No. __________________, on ________________.
NOW, THEREFORE, in consideration of the promises and of the mutual covenants herein contained, the parties hereto expressly agree as follows:
CONTRACTOR agrees:
1. SCOPE OF SERVICES. To do the work and furnish all the labor, materials, tools, equipment, and insurance required for the construction of PROJECT in accordance with the plans and specifications adopted on _____________, by Council Resolution No. __________________. The "contract documents," which include the bid documents, project plans, specifications, all letters of clarification, and the City of Stockton Standard Specifications and Plans, are incorporated into and made a part of this contract by this reference to the same extent as if fully set forth.
2. COMPENSATION. To do and perform the work contemplated hereby in a good and workmanlike manner and to furnish all labor, materials, tools, and equipment necessary therefore at the prices specified in Exhibit A, attached hereto and by reference made a part hereof, under the direction of and to the complete satisfaction of the Director of Public Works of the City of Stockton. Total compensation for services and reimbursement for costs shall not exceed $2,555,031.00, or as otherwise mutually agreed to in a Contract Change Order.
3. INSURANCE. CONTRACTOR shall not commence any work before obtaining, and shall maintain in force at all times during the duration and performance of this contract, the policies of insurance specified in Exhibit B, which is attached to this contract and incorporated by this reference, and as provided in the “contract documents” including Section 7-1.06 of the City of Stockton Standard Specifications and Plans as adopted on September 27, 2016, by Council Resolution No. 2016-09-27-1213, effective September 27, 2016.
Federal Construction Contract – DIRT DYNASTY, INC. – PROJECT NO. CML-5008(175) (Updated 12/30/20) It shall be a requirement under this Agreement that any available insurance proceeds broader than or in excess of the specified minimum Insurance coverage requirements and/or limits shall be available to the Additional Insured.
Furthermore, the requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this Agreement; or (2) the broader coverage and maximum limits of coverage of any Insurance policy or proceeds available to the named Insured; whichever is greater.
The Additional Insured coverage under the Contractor’s policy shall be “primary and noncontributory” and will not seek contribution from the City of Stockton’s insurance or selfinsurance and shall be at least as broad as CG 20 01 04 13.
The limits of insurance required in this Agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess Insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of the City of Stockton (if agreed to in a written contract or Agreement) before the City of Stockton’s own insurance or selfinsurance shall be called upon to protect it as a named insured.
All self-insured retentions (SIR) must be disclosed to Risk Management for approval and shall not reduce the limits of liability. Payment Bond in the amount of the self-insured retention (SIR) may be required.
Policies containing any self-insured retention (SIR) provision shall provide or be endorsed to provide that the SIR may be satisfied by either the named Insured or the City of Stockton.
The City of Stockton reserves the right to obtain a full certified copy of any Insurance policy and endorsements.
Failure to exercise this right shall not constitute a waiver of right to exercise later.
Contractor shall maintain insurance as required by this contract to the fullest amount allowed by law and shall maintain insurance for a minimum of five years following the completion of this project. In the event contractor fails to obtain or maintain completed operations coverage as required by this Agreement, the City at its sole discretion may purchase the coverage required and the cost will be paid by contractor.
Contractor agrees to include with all Subcontractors in their subcontract the same requirements and provisions of this Agreement including the indemnity and insurance requirements to the extent they apply to the scope of the Subcontractor’s work.
Subcontractors hired by Contractor agree to be bound to Contractor and the City of Stockton in the same manner and to the same extent as Contractor is bound to the City of Stockton under the Contract Documents. Subcontractor further agrees to include these same provisions with any Sub-subcontractor. A copy of the City of Stockton Contract
Federal Construction Contract – DIRT DYNASTY, INC. – PROJECT NO. CML-5008(175) (Updated 12/30/20) Document Indemnity and Insurance provisions will be furnished to the Subcontractor upon request. The General Contractor shall require all sub-contractors to provide a valid certificate of insurance and the required endorsements included in the Agreement prior to commencement of any work and contractor will provide proof of compliance to the City.
4. INDEMNITY AND HOLD HARMLESS. With the exception that this section shall in no event be construed to require indemnification by Contractor to a greater extent than permitted under the public policy of the State of California, Contractor shall indemnify, protect, defend with counsel approved by City and at Contractor’s sole cost and expense, and hold harmless City, its Mayor, Council, officials, representatives, agents, employees, and volunteers from and against any and all claims, causes of action, liabilities, judgments, awards, losses, liens, claims, stop notices, damages, expenses, and costs (including without limitation attorneys’ fees, expert and consultant fees, and other expenses of litigation) of every nature, including, but not limited to, death or injury to persons, or damage to property, which arise out of or are in any way connected with the work performed, materials furnished, or services provided under this Agreement, or from any violation of any federal, State, or municipal law or ordinance, or City Policy, by Contractor or Contractor’s officers, agents, employees, volunteers or subcontractors.
Contractor shall not be obligated to indemnify or defend City for claims finally determined by a court of law or arbitrator to arise from the active negligence or willful misconduct of the City. It is the intent of the Parties that this indemnity obligation is at least as broad as is permitted under California law. To the extent California Civil Code sections 2782, et seq., limit the defense or indemnity obligations of Contractor to City, the intent hereunder is to provide the maximum defense and indemnity obligations allowed by Contractor under the law. The indemnity set forth in this section shall not be limited by insurance requirements or by any other provision of this Agreement.
With exception that this section shall in no event be construed to require indemnification, including the duty to defend, by Contractor to a greater extent than permitted under the public policy of the State of California, the parties agree that Contractor’s duty to defend City is immediate and arises upon the filing of any claim against the City for damages which arise out of or are in any way connected with the work performed, materials furnished, or services provided under this Agreement by Contractor or Contractor’s officers, agents, employees, volunteers or subcontractors. Contractor’s duties and obligations to defend the City shall apply regardless of whether or not the issue of the City’s liability, breach of this Agreement, or other obligation or fault has been determined.
Contractor shall be immediately obligated to pay for City’s defense costs of the claim, including, but not limited to, court costs, attorney’s fees and costs, expert consultant and witness fees and costs, other witness fees, document reproduction costs, arbitration fees, and, if after final judgment an appeal is pursued, all of such costs for the appeal.
At the conclusion of the claim, if there is any determination or finding of sole active negligence or willful misconduct on the part of the City, City will then reimburse Contractor for amounts paid in excess of Contractor’s proportionate share of responsibility for the damages within 30 days after Contractor provides City with copies of all bills and expenses incurred in the defense of the claim(s). It is agreed between the parties that this reimbursement provision assures Contractor is not obligated to defend
Federal Construction Contract – DIRT DYNASTY, INC. – PROJECT NO. CML-5008(175) (Updated 12/30/20) or indemnify City in an amount greater than provided for under California law, including, without limitation, California Civil Code sections 2782, 2782.6, and 2782.8.
With the exception that this section shall in no event be construed to require indemnification by Contractor to a greater extent than permitted under the public policy of the State of California, and in addition to the other indemnity obligations in this Agreement, Contractor shall indemnify, defend, and hold harmless City, its Mayor, Council, officials, representatives, agents, employees, and volunteers from and against all claims, losses, expenses, and costs including, but not limited to, attorneys’ fees, arising out of any claim brought against the City by an employee, office, agent, or volunteer of Contractor, regardless of whether such claim may be covered by any applicable workers compensation insurance. Contractor’s indemnification obligation is not limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Contractor under workers’ compensation acts, disability acts, or other employee benefit acts.
The City’s acceptance of the insurance certificates required under this Agreement does not relieve the CONTRACTOR from its obligation under this paragraph. The indemnification obligations of this section shall survive the termination of this agreement.
Any exceptions to this language may result in a proposal being deemed non-responsive.
Contractor/Subcontractor's responsibility for such defense and indemnity obligations shall survive the termination or completion of this agreement for the full period of time allowed by law.
The defense and indemnification obligations of this agreement are undertaken in addition to, and shall not in any way be limited by, the insurance obligations contained in this agreement. If any section, subsection, sentence, clause or phrase of this indemnification is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity of the remaining portions of this indemnification.
5. STANDARD PLANS AND SPECIFICATIONS. The performance of said work and the furnishing of said materials shall be executed in accordance with Section 8-1.04B of the City of Stockton Standard Specifications and Plans as adopted on September 27, 2016, by Council Resolution No. 2016-09-27-1213, effective September 27, 2016, and the provisions of the issued project specifications.
The Director of Public Works will furnish CONTRACTOR a weekly statement showing the number of days charged to the contract for the preceding week, the number of days specified for completion of the contract, and the number of days remaining to complete the contract. CONTRACTOR will be allowed one (1) week in which to file a written protest setting forth in what respects said weekly statement is incorrect, otherwise the statement shall be deemed to have been accepted by CONTRACTOR as correct.
6. WORKING DAYS. It is agreed by the parties to the contract that in case all the work called for under the contract in all parts and requirements, is not finished or
Federal Construction Contract – DIRT DYNASTY, INC. – PROJECT NO. CML-5008(175) (Updated 12/30/20) completed within the number of days as set forth, damage will be sustained by CITY, and that it is and will be impracticable and extremely difficult to ascertain the actual damage which CITY will sustain in the event of and by reason of such delay; and it is therefore agreed that CONTRACTOR will pay to CITY the sum of THREE THOUSAND FIFTY AND NO/100 DOLLARS ($3,050) per day for each and every calendar day's delay in finishing the work in excess of the number of days prescribed; and CONTRACTOR agrees to pay said liquidated damages as herein provided, and in case the same are not paid, agrees that CITY, may deduct the amount thereof from any monies due or that may become due CONTRACTOR under the contract.
It is further agreed that in case the work called for under the contract is not finished and completed in all parts and requirements within the number of days as specified, CITY shall have the right to increase the number of days or not, as may seem best to serve the interest of CITY, and if CITY decides to increase the said number of days, CITY shall further have the right to charge to CONTRACTOR, CONTRACTOR's heirs, assigns or sureties, and to deduct from the final payment for the work, all or any part, as may be deemed proper, the liquidated damages as specified or the actual cost of engineering, inspection, superintendence, and other overhead expenses which are directly chargeable to the contract, and which accrue during the period of such extension, whichever is greater, except the cost of final surveys and preparation of final estimate shall not be included in such charges.
A working day shall not include, nor shall CONTRACTOR be assessed with liquidated damages nor the additional cost of engineering and inspection during any delay beyond the time named for the completion of the work caused by acts of God or of the public enemy, acts of CITY, fire, floods, epidemics, quarantine restrictions, strikes, and freight embargoes and subject to approval by the Director, inability to get materials ordered by CONTRACTOR or Subcontractor due to such causes provided that CONTRACTOR shall notify the Director in writing of the causes of delay within five (5) working days from the beginning of any such delay, and the Director shall ascertain the facts and the extent of the delay, and Director's findings of the facts thereon shall be final and conclusive.
If CONTRACTOR is delayed by reason of alterations made in these specifications, or by any act of the Director or of CITY, not contemplated by the contract, the time of completion shall be extended proportionately and CONTRACTOR shall be relieved during the period of such extension of any claim for liquidated damages, engineering or inspection charges or other penalties. CONTRACTOR shall have no claim for any other compensation for any such delay.
7. CONFORMANCE TO APPLICABLE LAWS
A. TITLE VI
Title VI of the Civil Rights Act of 1964 requires that “no person in the United States shall, on the grounds of race, color, or national origin, be excluded
Federal Construction Contract – DIRT DYNASTY, INC. – PROJECT NO. CML-5008(175) (Updated 12/30/20) from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving federal financial assistance.” (42 USC Section 2000d)
http://www.dol.gov/oasam/regs/statutes/titlevi.htm.
The City of Stockton requires compliance with the requirements of Title VI in all of its programs and activities regardless of funding source.
B. DISCRIMINATION AND HARASSMENT POLICY
The City of Stockton has a Discrimination and Harassment Policy (Exhibit C). The purpose of this policy is to reaffirm the CITY’s commitment to demonstrating respect for all individuals by strictly prohibiting discrimination and harassment, including sexual harassment in the workplace, to define the types of behavior and conduct prohibited by this policy, and to set forth a procedure for reporting, investigating, and resolving complaints of discrimination and harassment in the workplace.
C. LABOR STANDARDS AND PROVISIONS/CALIFORNIA LABOR CODE The bidder shall understand that conditions set forth in Chapter 1, Part 7, Division 2 of the California Labor Code shall be considered part of the contract agreement.
https://leginfo.legislature.ca.gov/faces/codes_displayText.xhtml?lawCode= LAB&division=2.&title=&part=7.&chapter=1.&article=2.
D. PREVAILING WAGE
CONTRACTOR and any Subcontractor shall pay each employee engaged in the trade or occupation not less than the prevailing hourly wage rate. In accordance with the provisions of Section 1770 of the Labor Code, the Director of Department of Industrial Relations of the State of California has determined the general prevailing rates of wages and employer payments for health and welfare, pension, vacation, travel time, and subsistence pay as provided for in Section 1773.1, apprenticeship or other training programs authorized by Section 3093 and similar purposes applicable to the work to be done. CONTRACTOR performing the work under this contract shall obtain a copy of the wage rate determination and shall distribute copies to each Subcontractor (see Exhibit D). As the wage determination for each craft reflects an expiration date, it shall be the prime CONTRACTOR and each Subcontractor's responsibility to insure that the prevailing wage rates of concern is current and paid to the employee.
(i) The CONTRACTOR performing the work shall be responsible for obtaining a copy of the State wage rate determination. State wage rates may be obtained at
Federal Construction Contract – DIRT DYNASTY, INC. – PROJECT NO. CML-5008(175) (Updated 12/30/20) http://www.dir.ca.gov/OPRL/pwd/Determinations/Northern/Northern.pdf.
The CONTRACTOR shall be responsible for posting said wage rates at a prominent location at the work site and shall maintain same in a good readable condition for the duration of the work.
(ii) Should the CONTRACTOR choose to work on a Saturday, Sunday or on a holiday recognized by the Labor Unions, the CONTRACTOR shall reimburse the CITY the actual cost of engineering, inspection, superintendence, and or other overhead expenses which are directly chargeable to the contract. Should such work be undertaken at the request of the CITY, reimbursement will not be required. To conform strictly with the provisions of Division 2, Part 7, Chapter 1, Article 2, of the Labor Code of the State of California. To forfeit as a penalty to CITY the sum of TWENTY-FIVE AND NO/100 DOLLARS ($25.00) for each laborer, worker, or mechanic employed by CONTRACTOR, or by any Subcontractor under CONTRACTOR, in the execution of this contract, for each calendar day during which any laborer, worker, or mechanic is required or permitted to work more than eight (8) hours and who is not paid the general prevailing rate of per diem wages for holiday and overtime work in violation of the provisions of Sections 1770 to 1781 of the Labor Code of the State of California. That all sums forfeited under the provisions of the foregoing sections shall be deducted from the payments to be made under the terms of this contract.
(iii) The CONTRACTOR to whom the contract is awarded shall insure that the prime and each subcontractor will in accordance with Section 1776 of the Labor Code, maintain certified payroll records. A copy of said records shall be provided with each invoice to the Public Works Department, Attention Contract Compliance Officer. It shall be the CONTRACTOR’S responsibility to obtain copies of the current prevailing wage rate determination for all subcontractors. Additionally, certified payroll records must be uploaded to the DIR website as required by labor code.
(iv) The CONTRACTOR shall comply with the provisions established in Section 1777.5 of the Labor Code concerning the 1) certified approval by local joint apprenticeship committees for the employment and training of apprentices, and 2) contribution of funds to administer and conduct apprenticeship programs, if applicable to the job.
E. APPENDIX E OF THE TITLE VI ASSURANCES
During the performance of this contract, the contractor, for itself, its assignees, and successors in interest agrees to comply with the Appendix E of the Title VI Assurances attached as Exhibit F.
Federal Construction Contract – DIRT DYNASTY, INC. – PROJECT NO. CML-5008(175) (Updated 12/30/20) CITY agrees:
8. COMPENSATION. To pay CONTRACTOR for the work herein
contemplated in the following manner: Progress payments will be made on or about the first day of each calendar month, in such sum as shall make the aggregate of payment up to such day equal to ninety-five percent (95%) of the proportional contract price, upon the basis of the progress certificate of the Director of Public Works as to the amount of work done and the proportional amount of the contract price represented therefore; and all of the remaining part of the contract price not as aforesaid paid, shall be paid at the expiration of thirty-five (35) days from the completion of said work of construction and the certification by the Director of Public Works of such completion.
9. SECURITIES. Pursuant to Section 22300 of the Public Contract Code, CONTRACTOR will be permitted, at its request and sole expense, to substitute securities for any monies withheld by the CITY to ensure performance under the contract. Said securities will be deposited either with the CITY or with a State or federally chartered bank as escrow agent. Securities eligible for this substitution are those listed in Section 16430 of the California Government Code or bank or savings and loan certificates of deposit.
CONTRACTOR shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon.
10. CHANGE ORDERS. CITY reserves the right to make such alterations, deviations, additions to or omissions from the plans and specifications, including the right to increase or decrease the quantity of any item or portion of the work, as may be deemed by the Engineer to be necessary or advisable and to require such extra work as may be determined by the Engineer to be required for the proper completion or construction of the whole work contemplated.
Any such changes will be set forth in a contract change order which will specify, in addition to the work done in connection with the change made, adjustment of contract time, if any, and the basis of compensation for such work. A contract change order will not become effective until approved by the City Manager and/or the City Council.
Processing of change orders shall be in accordance with Section 4-1.05A of the City of Stockton Standard Specifications and Plans as adopted by Council on September 27, 2016, by Resolution No. 2016-09-27-2013, effective September 27, 2016, or as otherwise amended by Council. When the compensation for an item of work is subject to adjustment under the provisions of Standard Specifications and Plans, Section 4-1.05A, CONTRACTOR shall, upon request, promptly furnish the Engineer with adequate detailed cost data for such item of work.
11. AUDITS
(a) CITY reserves the right to periodically audit all charges made by CONTRACTOR to CITY for services under the contract. Upon request, CONTRACTOR agrees to furnish CITY, or a designated representative, with necessary information and assistance.
Federal Construction Contract – DIRT DYNASTY, INC. – PROJECT NO. CML-5008(175) (Updated 12/30/20) (b) CONTRACTOR agrees that CITY or its delegate will have the right to review, obtain and copy all records pertaining to performance of the contract.
CONTRACTOR agrees to provide CITY or its delegate with any relevant information requested and shall permit CITY or its delegate access to its premises, upon reasonable notice, during normal business hours for the purpose of interviewing employees and inspecting and copying such books, records, accounts, and other material that may be relevant to a matter under investigation for the purpose of determining compliance with this requirement. CONTRACTOR further agrees to maintain such records for a period of five (5) years after final payment under the contract.
12. FHWA 1273 AND CARGO PREFERENCE ACT
Federal form FHWA 1273 is physically included in this contract as Exhibit E.
In compliance with the Cargo Preference Act of 1954 (CPA), 46 CFR §381, and the implementing regulations in 46 CFR §381.7, the Contractor agrees:
A. To utilize privately owned United States-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and tankers) involved, whenever shipping any equipment, material, or commodities pursuant to this contract, to the extent such vessels are available at fair and reasonable rates for United Statesflag commercial vessels; B. To furnish within 20 days following the date of loading for shipments originating within the United States or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated, “on-board” commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph (b) (1) of this section to both the Contracting Officer (through the prime contractor in the case of subcontractor bills-of-lading) and to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590; C. To insert the substance of the provisions of this clause in all subcontracts issued pursuant to this contract.
13. It is expressly understood and agreed by and between the parties hereto that a waiver of any of the conditions of this contract shall not be considered a waiver of any of the other conditions thereof.
//
//
//
//
//
//
//
//
EXHIBIT 2 1002
EXHIBIT A Page 11 of 132 EXHIBIT 2 1003
EXHIBIT A Page 12 of 132 EXHIBIT 2 1004
EXHIBIT A Page 13 of 132 EXHIBIT 2 1005
The City of Stockton is now using www.PINSAdvantage.com to track Insurance Certificates and all related documents.
The PINS system starts with The City of Stockton. A Stockton User logs into PINS and emails a request for proof of insurance to the Vendor/Contractor. The Vendor/Contractor forwards the request email to their Insurance Agent(s). The Insurance Agent(s) logs into www.PINSAdvantage.com and completes the insurance certificate online.
www.pinsadvantage.com
+ 1 626 844 1838
WHAT IS THE PROCESS?
Note: Vendors will receive the insurance request email from: [email protected] Thank you for your compliance!
01 02
03 04
The Vendor/
Contractor forwards
the email to their
insurance agent(s).
PINS notifies
The City of Stockton
that documents have
been submitted and
automatically checks
for compliance.
Agent(s) log into
PINSAdvantage.com
and complete
the insurance
certificate online
A Stockton User
logs into PINS and
emails a request for
insurance to the
Vendor/Contractor
EXHIBIT B Page 14 of 132 EXHIBIT 2 1006
REV 2017_09_01
https://stocktonca-my.sharepoint.com/personal/chyerle_leach_stocktonca_gov/Documents/CIP/Rosa/WT17002/Construction - Bid Flash/Exhibit_05_Insurance_for_WT17002.docx
NOTE: The City of Stockton is now using the online insurance program PINS Advantage. Once you have been awarded a contract you will receive an email from the City’s online insurance program requesting you to forward the email to your insurance provider(s). Please see attached flyer regarding PINS Advantage.
Insurance Requirements for Construction Contracts
Contractor shall procure and maintain for the duration of the contract, and for five (5) years thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees, or subcontractors. In the event contractor fails to obtain or maintain completed operations coverage as required by this agreement, the City, at its sole discretion, may purchase the coverage required and the cost will be paid by the contractor.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $5,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
4. Surety Bonds as described below.
5. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
It shall be a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be available to the Additional Insured. Furthermore, the requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this EXHIBIT B Page 15 of 132 EXHIBIT 2 1007
REV 2017_09_01
https://stocktonca-my.sharepoint.com/personal/chyerle_leach_stocktonca_gov/Documents/CIP/Rosa/WT17002/Construction - Bid Flash/Exhibit_05_Insurance_for_WT17002.docx
Agreement; or (2) the broader coverage and maximum limits of coverage of any Insurance policy or proceeds available to the named insured; whichever is greater. No representation is made that the minimum insurance requirements of this agreement are sufficient to cover the obligations of the Contractor under this agreement.
Limits of Insurance
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City of Stockton, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used). Additional insured Name of Organization shall read “City of Stockton, its officers, officials, employees, and volunteers.” Policy shall cover City of Stockton, its officers, officials, employees, and volunteers for all locations work is done under this contract.
Primary Coverage
The Additional Insured coverage under the Contractor’s policy shall be “primary and non-contributory” and will not seek contribution from the City’s insurance or selfinsurance and shall be at least as broad as CG 20 01 04 13. The City of Stockton does not accept endorsements limiting the Contractor’s insurance coverage to the sole negligence of the Named Insured.
Builder’s Risk (Course of Construction) Insurance
Contractor may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City of Stockton as a loss payee as their interest may appear.
EXHIBIT B Page 16 of 132 EXHIBIT 2 1008
REV 2017_09_01
https://stocktonca-my.sharepoint.com/personal/chyerle_leach_stocktonca_gov/Documents/CIP/Rosa/WT17002/Construction - Bid Flash/Exhibit_05_Insurance_for_WT17002.docx
If the project does not involve new or major reconstruction, at the option of the City of Stockton, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City of Stockton’s site.
Claims Made Policies – (Note – applicable only to professional and/or pollution liability)
If any coverage required is written on a claims-made coverage form:
1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.
4. A copy of the claims reporting requirements must be submitted to the City of Stockton for review.
5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the City of Stockton.
Waiver of Subrogation
EXHIBIT B Page 17 of 132 EXHIBIT 2 1009
REV 2017_09_01
https://stocktonca-my.sharepoint.com/personal/chyerle_leach_stocktonca_gov/Documents/CIP/Rosa/WT17002/Construction - Bid Flash/Exhibit_05_Insurance_for_WT17002.docx
Contractor hereby grants to City of Stockton a waiver of any right to subrogation which any insurer of said Contractor may acquire against the City of Stockton by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City of Stockton has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City of Stockton for all work performed by the Contractor, its employees, agents and subcontractors.
Self-Insured Retentions
All Self-insured retentions must be disclosed to Risk Management for approval and shall not reduce the limits of liability. The City of Stockton may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City of Stockton.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City of Stockton.
Verification of Coverage
Contractor shall furnish the City of Stockton with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City of Stockton Risk Services before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City of Stockton reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Contractor shall, prior to the commencement of work under this Agreement, provide the City of Stockton with a copy of its declarations page(s) and endorsement page(s) for each of the required policies.
Subcontractors
Contractors shall require and verify that all subcontractors, or other parties hired for this work, purchase and maintain coverage for indemnity and insurance requirements as least as broad as specified in this agreement to the extent they apply to the scope of EXHIBIT B Page 18 of 132 EXHIBIT 2 1010
REV 2017_09_01
https://stocktonca-my.sharepoint.com/personal/chyerle_leach_stocktonca_gov/Documents/CIP/Rosa/WT17002/Construction - Bid Flash/Exhibit_05_Insurance_for_WT17002.docx
the subcontractor’s work with the same certificate of insurance requirements and naming as additional insureds all parties to this contract. Contractor shall include the following language in their agreement with Subcontractors: Subcontractors hired by Contractor agree to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to City under the contract documents and provide a valid certificate of insurance and the required endorsements included in the agreement as proof of compliance prior to commencement of any work and to include this same requirement for any subcontractors they hire for this work. A copy of the owner contract document indemnity and insurance provisions will be furnished to the subcontractor upon request. Contractor shall provide proof of such compliance and verification to the City upon request.
Surety Bonds
Contractor shall provide the following Surety Bonds:
1. Bid bond
2. Performance bond
3. Payment bond (or Labor and Material bond)
4. Maintenance bond
The Payment Bond and the Performance Bond shall be in a sum equal to one hundred percent (100%) of the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.
Special Risks or Circumstances
City of Stockton reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
Certificate Holder Address
Proper address for mailing certificates, endorsements and notices shall be:
EXHIBIT B Page 19 of 132 EXHIBIT 2 1011
REV 2017_09_01
https://stocktonca-my.sharepoint.com/personal/chyerle_leach_stocktonca_gov/Documents/CIP/Rosa/WT17002/Construction - Bid Flash/Exhibit_05_Insurance_for_WT17002.docx
City of Stockton
Attn: City Risk Services
400 E Main Street, 3rd Floor – HR
Stockton, CA 95202
EXHIBIT B Page 20 of 132 EXHIBIT 2 1012
EXHIBIT C Page 21 of 132 EXHIBIT 2 1013
EXHIBIT C Page 22 of 132 EXHIBIT 2 1014
EXHIBIT C Page 23 of 132 EXHIBIT 2 1015
EXHIBIT C Page 24 of 132 EXHIBIT 2 1016
EXHIBIT C Page 25 of 132 EXHIBIT 2 1017
EXHIBIT C Page 26 of 132 EXHIBIT 2 1018
EXHIBIT C Page 27 of 132 EXHIBIT 2 1019
EXHIBIT C Page 28 of 132 EXHIBIT 2 1020
EXHIBIT C Page 29 of 132 EXHIBIT 2 1021
EXHIBIT C Page 30 of 132 EXHIBIT 2 1022
EXHIBIT C Page 31 of 132 EXHIBIT 2 1023
EXHIBIT C Page 32 of 132 EXHIBIT 2 1024
EXHIBIT C Page 33 of 132 EXHIBIT 2 1025
EXHIBIT C Page 34 of 132 EXHIBIT 2 1026
"General Decision Number: CA20220018 02/25/2022
Superseded General Decision Number: CA20210018
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
______________________________________________________________ |If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the | |2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $15.00 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2022. |
|______________________________|_____________________________| |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2022. |
|______________________________|_____________________________| The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker EXHIBIT D Page 35 of 132 EXHIBIT 2 1027
protections under the Executive Orders is available at
https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date
0 01/07/2022
1 01/14/2022
2 01/21/2022
3 02/18/2022
4 02/25/2022
ASBE0016-004 01/01/2021
AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &
TOULMNE COUNTIES
AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA
CLARA COUNTIES
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)
Area 1......................$ 30.45 10.60
Area 2......................$ 36.53 9.27
---------------------------------------------------------------- ASBE0016-008 01/01/2021
AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN
FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ
AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
Protective Coverings,
Coatings, and Finishes to all
types of mechanical systems)
Area 1......................$ 74.16 23.58
Area 2......................$ 46.81 33.50
---------------------------------------------------------------- BOIL0549-001 01/01/2021
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: REMAINING COUNTIES
Rates Fringes
EXHIBIT D Page 36 of 132 EXHIBIT 2 1028
BOILERMAKER
Area 1......................$ 49.62 41.27
Area 2......................$ 45.60 38.99
---------------------------------------------------------------- BRCA0003-001 08/01/2021
Rates Fringes
MARBLE FINISHER..................$ 37.72 17.64
---------------------------------------------------------------- BRCA0003-003 08/01/2021
Rates Fringes
MARBLE MASON.....................$ 53.17 29.10
---------------------------------------------------------------- BRCA0003-005 05/01/2020
Rates Fringes
BRICKLAYER
( 1) Fresno, Kings,
Madera, Mariposa, Merced....$ 43.68 22.19
( 7) San Francisco, San
Mateo.......................$ 47.65 26.77
( 8) Alameda, Contra
Costa, San Benito, Santa
Clara.......................$ 49.42 22.70
( 9) Calaveras, San
Joaquin, Stanislaus,
Toulumne....................$ 45.12 21.55
(16) Monterey, Santa Cruz...$ 45.88 25.02
---------------------------------------------------------------- BRCA0003-008 07/01/2021
Rates Fringes
TERRAZZO FINISHER................$ 39.95 18.46
TERRAZZO WORKER/SETTER...........$ 53.03 28.34
---------------------------------------------------------------- BRCA0003-011 04/01/2019
AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz
AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne
AREA 3: Fresno, Kings, Madera, Mariposa, Merced
Rates Fringes
TILE FINISHER
Area 1......................$ 29.94 16.38
Area 2......................$ 25.60 14.30
Area 3......................$ 26.58 15.65
Tile Layer
Area 1......................$ 49.90 19.16
Area 2......................$ 42.67 16.81
Area 3......................$ 40.27 18.58
---------------------------------------------------------------- CARP0022-001 07/01/2021
San Francisco County
EXHIBIT D Page 37 of 132 EXHIBIT 2 1029
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 55.00 31.49
Journeyman Carpenter........$ 54.85 31.49
Millwright..................$ 54.95 33.08
---------------------------------------------------------------- CARP0034-001 07/01/2021
Rates Fringes
Diver
Assistant Tender, ROV
Tender/Technician...........$ 54.10 34.69
Diver standby...............$ 60.51 34.69
Diver Tender................$ 59.51 34.69
Diver wet...................$ 103.62 34.69
Manifold Operator (mixed
gas)........................$ 64.51 34.69
Manifold Operator (Standby).$ 59.51 34.69
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot
101 to 150 ft $3.00 per foot
151 to 220 ft $4.00 per foot
221 ft.-deeper $5.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under
pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
---------------------------------------------------------------- CARP0034-003 07/01/2021
Rates Fringes
Piledriver.......................$ 54.10 34.69
---------------------------------------------------------------- CARP0035-007 07/01/2020
EXHIBIT D Page 38 of 132 EXHIBIT 2 1030
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties
Rates Fringes
Modular Furniture Installer
Area 1
Installer..................$ 28.76 22.53
Lead Installer.............$ 32.21 23.03
Master Installer...........$ 36.43 23.03
Area 2
Installer..................$ 26.11 22.53
Lead Installer.............$ 29.08 23.03
Master Installer...........$ 32.71 23.03
Area 3
Installer..................$ 25.16 22.53
Lead Installer.............$ 27.96 23.03
Master Installer...........$ 31.38 23.03
---------------------------------------------------------------- CARP0035-008 08/01/2020
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: San Joaquin
AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties
Rates Fringes
Drywall Installers/Lathers:
Area 1......................$ 52.65 31.26
Area 2......................$ 46.77 31.26
Area 3......................$ 47.27 31.26
Area 4......................$ 45.92 31.26
Drywall Stocker/Scrapper
Area 1......................$ 26.33 18.22
Area 2......................$ 23.39 18.22
Area 3......................$ 23.64 18.22
Area 4......................$ 22.97 18.22
---------------------------------------------------------------- CARP0152-001 07/01/2020
Contra Costa County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 52.80 30.82
EXHIBIT D Page 39 of 132 EXHIBIT 2 1031
Journeyman Carpenter........$ 52.65 30.82
Millwright..................$ 52.75 32.41
---------------------------------------------------------------- CARP0152-002 07/01/2020
San Joaquin County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 46.92 30.82
Journeyman Carpenter........$ 46.77 30.82
Millwright..................$ 49.27 32.41
---------------------------------------------------------------- CARP0152-004 07/01/2020
Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 45.57 30.82
Journeyman Carpenter........$ 45.42 30.82
Millwright..................$ 47.92 32.41
---------------------------------------------------------------- CARP0217-001 07/01/2021
San Mateo County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 55.00 31.49
Journeyman Carpenter........$ 54.85 31.49
Millwright..................$ 54.95 33.08
---------------------------------------------------------------- CARP0405-001 07/01/2021
Santa Clara County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
EXHIBIT D Page 40 of 132 EXHIBIT 2 1032
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 55.00 31.49
Journeyman Carpenter........$ 54.85 31.49
Millwright..................$ 54.95 33.08
---------------------------------------------------------------- CARP0405-002 07/01/2021
San Benito County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0505-001 07/01/2021
Santa Cruz County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0605-001 07/01/2021
Monterey County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0701-001 07/01/2021
Fresno and Madera Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
EXHIBIT D Page 41 of 132 EXHIBIT 2 1033
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 47.77 31.49
Journeyman Carpenter........$ 47.62 31.49
Millwright..................$ 50.12 33.08
---------------------------------------------------------------- CARP0713-001 07/01/2021
Alameda County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 55.00 31.49
Journeyman Carpenter........$ 54.85 31.49
Millwright..................$ 54.95 33.08
---------------------------------------------------------------- CARP1109-001 07/01/2021
Kings County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 47.77 31.49
Journeyman Carpenter........$ 47.62 31.49
Millwright..................$ 50.12 33.08
---------------------------------------------------------------- ELEC0006-004 12/01/2021
SAN FRANCISCO COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 48.43 3%+23.15
Technician..................$ 55.69 3%+23.15
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' EXHIBIT D Page 42 of 132 EXHIBIT 2 1034
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0006-007 06/01/2021
SAN FRANCISCO COUNTY
Rates Fringes
ELECTRICIAN......................$ 80.00 3%+39.215
---------------------------------------------------------------- ELEC0100-002 09/01/2021
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 41.00 26.18
---------------------------------------------------------------- ELEC0100-005 12/01/2019
FRESNO, KINGS, MADERA
Rates Fringes
Communications System
Installer...................$ 35.25 20.86
Technician..................$ 40.54 21.02
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance,
background-foreground music, intercom and telephone
interconnect, inventory control systems, microwave
transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone
interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems,
Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical
entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video
entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration EXHIBIT D Page 43 of 132 EXHIBIT 2 1035
sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and
Baseband and Carriers Point of Sale Systems, VSAT Data
Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).
Chases and/or nipples (not to exceed 10 feet) may be
installed on open wiring systems. Energy management
systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the
scope). Fire alarm systems when installed in raceways
(including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two (2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
---------------------------------------------------------------- ELEC0234-001 12/28/2020
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
ELECTRICIAN
Zone A......................$ 53.41 27.95
Zone B......................$ 58.75 28.11
Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
---------------------------------------------------------------- ELEC0234-003 12/01/2020
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Rates Fringes
Sound & Communications
Installer...................$ 45.50 22.52
Technician..................$ 52.33 22.72
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are EXHIBIT D Page 44 of 132 EXHIBIT 2 1036
installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0302-001 03/01/2021
CONTRA COSTA COUNTY
Rates Fringes
CABLE SPLICER....................$ 63.86 29.17
ELECTRICIAN......................$ 56.76 28.95
---------------------------------------------------------------- ELEC0302-003 12/01/2020
CONTRA COSTA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 42.11 22.52
Technician..................$ 44.83 22.72
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0332-001 06/01/2021
SANTA CLARA COUNTY
Rates Fringes
CABLE SPLICER....................$ 86.45 42.14
ELECTRICIAN......................$ 75.17 41.81
EXHIBIT D Page 45 of 132 EXHIBIT 2 1037
FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.
Work on structures of 60 ft. or over (as described above):
to be paid twice the straight-time rate of pay.
---------------------------------------------------------------- ELEC0332-003 12/01/2021
SANTA CLARA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 47.93 24.088
Technician..................$ 55.12 24.304
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0595-001 06/01/2021
ALAMEDA COUNTY
Rates Fringes
CABLE SPLICER....................$ 72.80 3%+39.94
ELECTRICIAN......................$ 63.30 3%+39.94
---------------------------------------------------------------- ELEC0595-002 06/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
CABLE SPLICER....................$ 50.70 7.75%+25.58
ELECTRICIAN
(1) Tunnel work.............$ 44.25 7.75%+25.58
(2) All other work.........$ 42.25 7.75%+25.58
---------------------------------------------------------------- ELEC0595-006 12/01/2021
EXHIBIT D Page 46 of 132 EXHIBIT 2 1038
ALAMEDA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 47.93 3%+22.65
Technician..................$ 55.12 3%+22.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0595-008 12/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
Communications System
Installer...................$ 38.24 3%+22.65
Technician..................$ 43.98 3%+22.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0617-001 06/01/2021
EXHIBIT D Page 47 of 132 EXHIBIT 2 1039
SAN MATEO COUNTY
Rates Fringes
ELECTRICIAN......................$ 70.00 41.74
---------------------------------------------------------------- ELEC0617-003 12/01/2021
SAN MATEO COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 47.93 24.09
Technician..................$ 55.12 24.30
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0684-001 12/01/2021
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 42.50 4.5%+25.88
CABLE SPLICER = 110% of Journeyman Electrician
---------------------------------------------------------------- ELEC0684-004 12/01/2021
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
Communications System
Installer...................$ 38.24 23.80
Technician..................$ 43.98 23.97
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
EXHIBIT D Page 48 of 132 EXHIBIT 2 1040
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC1245-001 01/01/2022
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 60.19 22.07
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment).............$ 48.08 20.86
(3) Groundman...............$ 36.76 20.46
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
---------------------------------------------------------------- ELEV0008-001 01/01/2022
Rates Fringes
ELEVATOR MECHANIC................$ 74.54 36.885+a+b
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
---------------------------------------------------------------- ENGI0003-001 06/29/2020
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.
SEE AREA DEFINITIONS BELOW
EXHIBIT D Page 49 of 132 EXHIBIT 2 1041
Rates Fringes
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 51.42 31.15
GROUP 2.....................$ 49.89 31.15
GROUP 3.....................$ 48.41 31.15
GROUP 4.....................$ 47.03 31.15
GROUP 5.....................$ 45.76 31.15
GROUP 6.....................$ 44.44 31.15
GROUP 7.....................$ 43.30 31.15
GROUP 8.....................$ 42.16 31.15
GROUP 8-A...................$ 39.95 31.15
OPERATOR: Power Equipment
(Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 52.30 31.15
Oiler......................$ 43.79 31.15
Truck crane oiler..........$ 46.08 31.15
GROUP 2
Cranes.....................$ 50.54 31.15
Oiler......................$ 42.83 31.15
Truck crane oiler..........$ 45.07 31.15
GROUP 3
Cranes.....................$ 48.80 31.15
Hydraulic..................$ 44.44 31.15
Oiler......................$ 42.55 31.15
Truck crane oiler..........$ 44.83 31.15
GROUP 4
Cranes.....................$ 45.76 31.15
OPERATOR: Power Equipment
(Piledriving - AREA 1:)
GROUP 1
Lifting devices............$ 52.64 31.15
Oiler......................$ 43.38 31.15
Truck Crane Oiler..........$ 45.66 31.15
GROUP 2
Lifting devices............$ 50.82 31.15
Oiler......................$ 43.11 31.15
Truck Crane Oiler..........$ 45.41 31.15
GROUP 3
Lifting devices............$ 49.14 31.15
Oiler......................$ 42.89 31.15
Truck Crane Oiler..........$ 45.12 31.15
GROUP 4
Lifting devices............$ 47.37 31.15
GROUP 5
Lifting devices............$ 44.73 31.15
GROUP 6
Lifting devices............$ 42.50 31.15
OPERATOR: Power Equipment
(Steel Erection - AREA 1:)
GROUP 1
Cranes.....................$ 53.27 31.15
Oiler......................$ 43.72 31.15
Truck Crane Oiler..........$ 45.95 31.15
GROUP 2
Cranes.....................$ 51.50 31.15
Oiler......................$ 43.45 31.15
Truck Crane Oiler..........$ 45.73 31.15
GROUP 3
Cranes.....................$ 50.02 31.15
Hydraulic..................$ 45.07 31.15
Oiler......................$ 43.23 31.15
EXHIBIT D Page 50 of 132 EXHIBIT 2 1042
Truck Crane Oiler..........$ 45.46 31.15
GROUP 4
Cranes.....................$ 48.00 31.15
GROUP 5
Cranes.....................$ 46.70 31.15
OPERATOR: Power Equipment
(Tunnel and Underground Work
- AREA 1:)
SHAFTS, STOPES, RAISES:
GROUP 1....................$ 47.52 31.15
GROUP 1-A..................$ 49.99 31.15
GROUP 2....................$ 46.26 31.15
GROUP 3....................$ 44.93 31.15
GROUP 4....................$ 43.79 31.15
GROUP 5....................$ 42.65 31.15
UNDERGROUND:
GROUP 1....................$ 47.42 31.15
GROUP 1-A..................$ 49.89 31.15
GROUP 2....................$ 46.16 31.15
GROUP 3....................$ 44.83 31.15
GROUP 4....................$ 43.69 31.15
GROUP 5....................$ 42.55 31.15
FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat
operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.
m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane
mounted continuous flight tie back machine, tonnage to
apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track
loader 4 cu. yds. and over; Wheel excavator (up to and
including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade
checker (GPS, mechanical or otherwise); Grooving and
grinding machine; Heading shield operator; Heavy-duty
drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader;
Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller
Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, EXHIBIT D Page 51 of 132 EXHIBIT 2 1043
asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil
stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill
combination; Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor,
building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete)
(Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine,
concrete or asphalt); Mine or shaft hoist; Portable
crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled
compactor with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5 ft.
depth; Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine,
truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600,
Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with
attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines
only); Pipe wrapping machine (tractor propelled and
supported); Screed (except asphaltic concrete paving);
Self- propelled pipeline wrapping machine; Tractor;
Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose
A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab
machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip
Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals);
Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator;
EXHIBIT D Page 52 of 132 EXHIBIT 2 1044
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator;
Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump
operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum
sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum
cooling plant; Welding machine (powered other than by
electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
----------------------------------------------------------
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge
pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and
including 100 tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45 tons;
Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;
GROUP 4: Boom Truck or dual purpose A-frame truck,
non-rotating over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;
-----------------------------------------------------------
PILEDRIVERS
GROUP 1: Derrick barge pedestal mounted over 100 tons;
Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons
GROUP 2: Derrick barge pedestal mounted 45 tons to and
including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under;
Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under
EXHIBIT D Page 53 of 132 EXHIBIT 2 1045
GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder GROUP 5: Deck engineer
GROUP 6: Deckhand; Fire tender
-------------------------------------------------------------
STEEL ERECTORS
GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons
GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane
GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under
GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder
GROUP 5: Boom cat
-------------------------------------------------------------- --
TUNNEL AND UNDERGROUND WORK
GROUP 1-A: Tunnel bore machine operator, 20' diameter or more
GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator
GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator
GROUP 3: Drill doctor; Mine or shaft hoist
GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman
GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump
operator; Slusher operator
----------------------------------------------------------- AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors]
AREA 1: ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS,
MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE
AREA 2 -NOTED BELOW
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
EXHIBIT D Page 54 of 132 EXHIBIT 2 1046
CALAVERAS COUNTY:
Area 1: Remainder
Area 2: Eastern Part
FRESNO COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MADERA COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MARIPOSA COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MONTEREY COUNTY:
Area 1: Remainder
Area 2: Southwestern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
---------------------------------------------------------------- ENGI0003-008 07/20/2020
Rates Fringes
Dredging: (DREDGING:
CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
(1) Leverman...............$ 49.88 34.35
(2) Dredge Dozer; Heavy
duty repairman.............$ 44.92 34.35
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 43.80 34.35
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 40.50 34.35
AREA 2:
(1) Leverman...............$ 51.88 34.35
(2) Dredge Dozer; Heavy
duty repairman.............$ 46.92 34.35
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 45.80 34.35
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 42.50 34.35
AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY
EXHIBIT D Page 55 of 132 EXHIBIT 2 1047
THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Remainder
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY:
Area 1: Remainder
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
MONTERREY COUNTY
Area 1: Except Southwestern part
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: Al but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
EXHIBIT D Page 56 of 132 EXHIBIT 2 1048
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Remainder
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeastern border with Shasta County
Area 2: Remainder
TUOLUMNE COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
---------------------------------------------------------------- ENGI0003-019 06/29/2020
SEE AREA DESCRIPTIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(LANDSCAPE WORK ONLY)
GROUP 1
AREA 1.....................$ 39.95 30.28
AREA 2.....................$ 41.95 30.28
GROUP 2
AREA 1.....................$ 36.35 30.28
AREA 2.....................$ 38.35 30.28
GROUP 3
AREA 1.....................$ 31.74 30.28
AREA 2.....................$ 33.74 30.28
GROUP DESCRIPTIONS:
GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.
GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment
shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and
Winch Truck, Backhoe, Forklift, Hydragraphic Seeder
Machine, Roller, Rubber-Tired and Track Earthmoving
Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.
GROUP 3: Landscae Utility Operator: Small Rubber-Tired
Tractor, Trencher Under 31 HP.
AREA DESCRIPTIONS:
AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, EXHIBIT D Page 57 of 132 EXHIBIT 2 1049
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
HUMBOLDT COUNTY:
Area 1: Except Eastern and Southwestern parts
Area 2: Remainder
LAKE COUNTY:
Area 1: Southern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY
Area 1: Remainder
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Remainder
Area 2: Eastern part
MENDOCINO COUNTY:
Area 1: Central and Southeastern parts
Area 2: Remainder
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern part
NEVADA COUNTY:
EXHIBIT D Page 58 of 132 EXHIBIT 2 1050
Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: All but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Reaminder
TEHAMA COUNTY:
Area 1: All but the Western border with mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeaster border with Shasta County
Area 2: Remainder
TULARE COUNTY;
Area 1: Remainder
Area 2: Eastern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
---------------------------------------------------------------- IRON0377-001 07/01/2021
ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA & SAN FRANCISCO
COUNTIES
Rates Fringes
Ironworkers:
Fence Erector...............$ 38.08 24.91
Ornamental, Reinforcing
and Structural..............$ 45.73 33.55
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval EXHIBIT D Page 59 of 132 EXHIBIT 2 1051
Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- IRON0433-005 07/01/2020
REMAINING COUNTIES
Rates Fringes
IRONWORKER
Fence Erector...............$ 34.58 24.81
Ornamental, Reinforcing
and Structural..............$ 41.00 33.45
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0067-002 06/28/2021
AREA ""A"" - ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND
SANTA CLARA COUNTIES
AREA ""B"" - CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND
TUOLUMNE COUNTIES
Rates Fringes
Asbestos Removal Laborer
EXHIBIT D Page 60 of 132 EXHIBIT 2 1052
All Counties................$ 26.05 12.75
LABORER (Lead Removal)
Area A......................$ 34.37 25.95
Area B......................$ 33.37 25.95
ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of
asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations.
---------------------------------------------------------------- LABO0073-002 06/28/2021
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 33.48 26.21
Traffic Control Person I....$ 33.78 26.21
Traffic Control Person II...$ 31.28 26.21
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0073-003 07/01/2021
SAN JOAQUIN COUNTY
Rates Fringes
LABORER
Mason Tender-Brick..........$ 34.09 24.41
---------------------------------------------------------------- LABO0073-005 07/01/2021
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 42.00 25.71
GROUP 2.....................$ 41.77 25.71
GROUP 3.....................$ 41.52 25.71
GROUP 4.....................$ 41.07 25.71
GROUP 5.....................$ 40.53 25.71
Shotcrete Specialist........$ 42.52 25.71
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; EXHIBIT D Page 61 of 132 EXHIBIT 2 1053
Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0073-007 06/25/2018
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS)
Construction Specialist
Group.......................$ 30.49 23.20
GROUP 1.....................$ 29.79 23.20
GROUP 1-a...................$ 30.01 23.20
GROUP 1-c...................$ 29.84 23.20
GROUP 1-e...................$ 30.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 29.64 23.20
GROUP 3.....................$ 29.54 23.20
GROUP 4.....................$ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS)
(1) New Construction........$ 29.54 23.20
(2) Establishment Warranty
Period......................$ 23.23 23.20
LABORER (GUNITE)
GROUP 1.....................$ 29.75 22.31
GROUP 2.....................$ 29.25 22.31
GROUP 3.....................$ 28.66 22.31
GROUP 4.....................$ 28.54 22.31
LABORER (WRECKING)
GROUP 1.....................$ 29.79 23.20
GROUP 2.....................$ 29.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; EXHIBIT D Page 62 of 132 EXHIBIT 2 1054
Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
EXHIBIT D Page 63 of 132 EXHIBIT 2 1055
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
EXHIBIT D Page 64 of 132 EXHIBIT 2 1056
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0073-009 07/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 35.82 28.45
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0261-003 06/28/2021
SAN FRANCISCO AND SAN MATEO COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 34.48 26.21
Traffic Control Person I....$ 34.78 26.21
Traffic Control Person II...$ 32.28 26.21
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0261-005 07/01/2021
SAN FRANCISCO AND SAN MATEO COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 42.00 25.71
GROUP 2.....................$ 41.77 25.71
GROUP 3.....................$ 41.52 25.71
GROUP 4.....................$ 41.07 25.71
GROUP 5.....................$ 40.53 25.71
Shotcrete Specialist........$ 42.52 25.71
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
EXHIBIT D Page 65 of 132 EXHIBIT 2 1057
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0261-009 06/25/2018
SAN FRANCISCO, AND SAN MATEO COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 31.49 23.20
GROUP 1.....................$ 30.79 23.20
GROUP 1-a...................$ 31.01 23.20
GROUP 1-c...................$ 30.84 23.20
GROUP 1-e...................$ 31.34 23.20
GROUP 1-f...................$ 31.37 23.20
GROUP 2.....................$ 30.64 23.20
GROUP 3.....................$ 30.54 23.20
GROUP 4.....................$ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 30.54 23.20
(2) Establishment Warranty
Period......................$ 24.23 23.20
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 30.79 23.20
GROUP 2.....................$ 30.64 23.20
Laborers: (GUNITE - AREA A:)
GROUP 1.....................$ 30.75 22.31
GROUP 2.....................$ 30.25 22.31
GROUP 3.....................$ 29.66 22.31
GROUP 4.....................$ 29.54 22.31
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
EXHIBIT D Page 66 of 132 EXHIBIT 2 1058
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All EXHIBIT D Page 67 of 132 EXHIBIT 2 1059
employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
EXHIBIT D Page 68 of 132 EXHIBIT 2 1060
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0261-011 07/01/2021
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates Fringes
MASON TENDER, BRICK..............$ 34.85 26.32
FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. Work in live sewage:
$2.50 per day additional.
---------------------------------------------------------------- LABO0261-014 07/01/2021
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates Fringes
PLASTER TENDER...................$ 38.28 29.43
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0270-003 06/28/2021
AREA A: SANTA CLARA
AREA B: MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person
Area A.....................$ 34.48 26.21
Area B.....................$ 33.48 26.21
Traffic Control Person I
Area A.....................$ 34.78 26.21
Area B.....................$ 33.78 26.21
Traffic Control Person II
Area A.....................$ 32.28 26.21
Area B.....................$ 31.28 26.21
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
EXHIBIT D Page 69 of 132 EXHIBIT 2 1061
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0270-004 07/01/2021
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 42.00 25.71
GROUP 2.....................$ 41.77 25.71
GROUP 3.....................$ 41.52 25.71
GROUP 4.....................$ 41.07 25.71
GROUP 5.....................$ 40.53 25.71
Shotcrete Specialist........$ 42.52 25.71
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0270-005 07/01/2021
MONTEREY AND SAN BENITO COUNTIES
Rates Fringes
LABORER
Mason Tender-Brick..........$ 34.09 24.41
---------------------------------------------------------------- LABO0270-007 06/25/2018
MONTEREY, SAN BENITO, AND SANTA CRUZ, COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B)
Construction Specialist
Group.......................$ 30.40 23.20
GROUP 1.....................$ 29.79 23.20
EXHIBIT D Page 70 of 132 EXHIBIT 2 1062
GROUP 1-a...................$ 30.01 23.20
GROUP 1-c...................$ 29.84 23.20
GROUP 1-e...................$ 30.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 29.64 23.20
GROUP 3.....................$ 29.54 23.20
GROUP 4.....................$ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B)
(1) New Construction........$ 29.54 23.20
(2) Establishment Warranty
Period......................$ 23.23 23.20
LABORER (GUNITE - AREA B)
GROUP 1.....................$ 29.75 22.31
GROUP 2.....................$ 29.25 22.31
GROUP 3.....................$ 28.66 22.31
GROUP 4.....................$ 28.54 22.31
LABORER (WRECKING - AREA B)
GROUP 1.....................$ 29.79 23.20
GROUP 2.....................$ 29.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
EXHIBIT D Page 71 of 132 EXHIBIT 2 1063
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
EXHIBIT D Page 72 of 132 EXHIBIT 2 1064
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0270-010 06/25/2018
SANTA CLARA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 31.49 23.20
GROUP 1.....................$ 30.79 23.20
GROUP 1-a...................$ 31.01 23.20
GROUP 1-c...................$ 30.84 23.20
GROUP 1-e...................$ 31.34 23.20
GROUP 1-f...................$ 30.37 23.20
EXHIBIT D Page 73 of 132 EXHIBIT 2 1065
GROUP 2.....................$ 30.64 23.20
GROUP 3.....................$ 30.54 23.20
GROUP 4.....................$ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 30.54 23.20
(2) Establishment Warranty
Period......................$ 24.23 23.20
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 30.75 22.31
GROUP 2.....................$ 30.25 22.31
GROUP 3.....................$ 29.66 22.31
GROUP 4.....................$ 29.54 22.31
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 30.79 23.20
GROUP 2.....................$ 30.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and EXHIBIT D Page 74 of 132 EXHIBIT 2 1066
similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general EXHIBIT D Page 75 of 132 EXHIBIT 2 1067
laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0270-011 07/01/2017
MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 34.70 21.22
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-001 07/01/2020
FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes
LABORER (Brick)
Mason Tender-Brick..........$ 32.84 23.71
---------------------------------------------------------------- EXHIBIT D Page 76 of 132 EXHIBIT 2 1068
LABO0294-002 06/28/2021
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 33.48 26.21
Traffic Control Person I....$ 33.78 26.21
Traffic Control Person II...$ 31.28 26.21
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0294-005 07/01/2021
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 42.00 25.71
GROUP 2.....................$ 41.77 25.71
GROUP 3.....................$ 41.52 25.71
GROUP 4.....................$ 41.07 25.71
GROUP 5.....................$ 40.53 25.71
Shotcrete Specialist........$ 42.52 25.71
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0294-008 06/25/2018
FRESNO, KINGS, AND MADERA COUNTIES
EXHIBIT D Page 77 of 132 EXHIBIT 2 1069
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 30.49 23.20
GROUP 1.....................$ 29.79 23.20
GROUP 1-a...................$ 30.01 23.20
GROUP 1-c...................$ 29.84 23.20
GROUP 1-e...................$ 30.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 29.64 23.20
GROUP 3.....................$ 29.54 23.20
GROUP 4.....................$ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 29.54 23.20
(2) Establishment Warranty
Period......................$ 23.23 23.20
LABORER (GUNITE - AREA B:)
GROUP 1.....................$ 29.75 22.31
GROUP 2.....................$ 29.25 22.31
GROUP 3.....................$ 28.66 22.31
GROUP 4.....................$ 28.54 22.31
LABORER (WRECKING - AREA B:)
GROUP 1.....................$ 29.79 23.20
GROUP 2.....................$ 29.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, EXHIBIT D Page 78 of 132 EXHIBIT 2 1070
whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, EXHIBIT D Page 79 of 132 EXHIBIT 2 1071
chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0294-010 07/01/2021
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS & TUOLUMNE
Rates Fringes
EXHIBIT D Page 80 of 132 EXHIBIT 2 1072
Plasterer tender.................$ 35.82 28.45
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-011 07/01/2021
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 35.82 28.45
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0304-002 06/28/2021
ALAMEDA COUNTY
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 34.48 26.21
Traffic Control Person I....$ 34.78 26.21
Traffic Control Person II...$ 32.28 26.21
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0304-003 07/01/2021
ALAMEDA COUNTY
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 42.00 25.71
GROUP 2.....................$ 41.77 25.71
GROUP 3.....................$ 41.52 25.71
GROUP 4.....................$ 41.07 25.71
GROUP 5.....................$ 40.53 25.71
Shotcrete Specialist........$ 42.52 25.71
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute EXHIBIT D Page 81 of 132 EXHIBIT 2 1073
materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0304-004 06/25/2018
ALAMEDA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 31.49 23.20
GROUP 1.....................$ 30.79 23.20
GROUP 1-a...................$ 31.01 23.20
GROUP 1-c...................$ 30.84 23.20
GROUP 1-e...................$ 31.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 30.64 23.20
GROUP 3.....................$ 30.54 23.20
GROUP 4.....................$ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 30.54 23.20
(2) Establishment Warranty
Period......................$ 24.23 23.20
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 30.75 22.31
GROUP 2.....................$ 30.25 22.31
GROUP 3.....................$ 29.66 22.31
GROUP 4.....................$ 29.54 22.31
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 30.79 23.20
GROUP 2.....................$ 30.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, EXHIBIT D Page 82 of 132 EXHIBIT 2 1074
pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing EXHIBIT D Page 83 of 132 EXHIBIT 2 1075
is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, EXHIBIT D Page 84 of 132 EXHIBIT 2 1076
windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0304-005 05/01/2018
ALAMEDA COUNTY
Rates Fringes
Brick Tender.....................$ 35.37 20.70
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0304-008 07/01/2017
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Plasterer tender.................$ 34.70 23.11
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0324-002 06/28/2021
CONTRA COSTA COUNTY
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 34.48 26.21
Traffic Control Person I....$ 34.78 26.21
Traffic Control Person II...$ 32.28 26.21
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0324-006 06/25/2018
CONTRA COSTA COUNTY
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 37.82 24.11
GROUP 2.....................$ 37.59 24.11
GROUP 3.....................$ 37.34 24.11
GROUP 4.....................$ 36.89 24.11
GROUP 5.....................$ 36.35 24.11
Shotcrete Specialist........$ 38.34 24.11
TUNNEL AND SHAFT CLASSIFICATIONS
EXHIBIT D Page 85 of 132 EXHIBIT 2 1077
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0324-012 06/25/2018
CONTRA COSTA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 31.49 23.20
GROUP 1.....................$ 30.79 23.20
GROUP 1-a...................$ 31.01 23.20
GROUP 1-c...................$ 30.84 23.20
GROUP 1-e...................$ 31.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 1-g...................$ 30.99 23.20
GROUP 2.....................$ 30.64 23.20
GROUP 3.....................$ 30.54 23.20
GROUP 4.....................$ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 30.54 23.20
(2) Establishment Warranty
Period......................$ 24.23 23.20
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 30.75 22.31
GROUP 2.....................$ 30.25 22.31
GROUP 3.....................$ 29.66 22.31
GROUP 4.....................$ 29.54 22.31
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 30.79 23.20
GROUP 2.....................$ 30.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a EXHIBIT D Page 86 of 132 EXHIBIT 2 1078
below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
EXHIBIT D Page 87 of 132 EXHIBIT 2 1079
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or EXHIBIT D Page 88 of 132 EXHIBIT 2 1080
temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
---------------------------------------------------------------- LABO0324-014 05/01/2018
CONTRA COSTA COUNTY:
Rates Fringes
Brick Tender.....................$ 35.37 20.70
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0324-018 07/01/2021
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Plasterer tender.................$ 38.28 29.43
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-002 06/28/2021
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
EXHIBIT D Page 89 of 132 EXHIBIT 2 1081
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 33.48 26.21
Traffic Control Person I....$ 33.78 26.21
Traffic Control Person II...$ 31.28 26.21
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO1130-003 06/26/2017
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 36.60 24.83
GROUP 2.....................$ 36.37 24.83
GROUP 3.....................$ 36.12 24.83
GROUP 4.....................$ 35.67 24.83
GROUP 5.....................$ 35.13 24.83
Shotcrete Specialist........$ 37.12 24.83
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO1130-005 07/01/2018
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
LABORER
Mason Tender-Brick..........$ 31.20 22.20
---------------------------------------------------------------- EXHIBIT D Page 90 of 132 EXHIBIT 2 1082
LABO1130-007 06/25/2018
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 30.49 23.20
GROUP 1.....................$ 29.79 23.20
GROUP 1-a...................$ 30.01 23.20
GROUP 1-c...................$ 29.84 23.20
GROUP 1-e...................$ 30.34 23.20
GROUP 1-f...................$ 29.37 23.20
GROUP 2.....................$ 29.64 23.20
GROUP 3.....................$ 29.54 23.20
GROUP 4.....................$ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 29.54 23.20
(2) Establishment Warranty
Period......................$ 23.23 23.20
LABORER (GUNITE - AREA B:)
GROUP 1.....................$ 29.75 22.31
GROUP 2.....................$ 29.25 22.31
GROUP 3.....................$ 28.66 22.31
GROUP 4.....................$ 28.54 22.31
LABORER (WRECKING - AREA B:)
GROUP 1.....................$ 29.79 23.20
GROUP 2.....................$ 29.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; EXHIBIT D Page 91 of 132 EXHIBIT 2 1083
Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
EXHIBIT D Page 92 of 132 EXHIBIT 2 1084
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.
The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO1130-008 07/01/2021
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS & TUOLUMNE
EXHIBIT D Page 93 of 132 EXHIBIT 2 1085
Rates Fringes
Plasterer tender.................$ 35.82 28.45
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-009 07/01/2021
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 35.82 28.45
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0016-001 01/01/2021
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA
CLARA, AND SANTA CRUZ COUNTIES
Rates Fringes
Painters:........................$ 45.22 25.48
PREMIUMS:
EXOTIC MATERIALS - $1.25 additional per hour.
SPRAY WORK: - $0.50 additional per hour.
INDUSTRIAL PAINTING - $0.25 additional per hour
[Work on industrial buildings used for the manufacture and processing of goods for sale or service; steel construction (bridges), stacks, towers, tanks, and similar structures] HIGH WORK:
over 50 feet - $2.00 per hour additional
100 to 180 feet - $4.00 per hour additional
Over 180 feet - $6.00 per houir additional
---------------------------------------------------------------- PAIN0016-003 07/01/2021
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: CALAVERAS, MARIPOA, MERCED, MONTEREY, SAN BENITO, SAN
JOAQUIN, SANTA CRUZ, STANISLAUS & TUOLUMNE COUNTIES
Rates Fringes
Drywall Finisher/Taper
AREA 1......................$ 54.91 29.49
AREA 2......................$ 50.78 28.09
---------------------------------------------------------------- PAIN0016-012 01/01/2019
ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO,
SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES Rates Fringes
EXHIBIT D Page 94 of 132 EXHIBIT 2 1086
SOFT FLOOR LAYER.................$ 48.60 27.43
---------------------------------------------------------------- PAIN0016-015 01/01/2021
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES
Rates Fringes
PAINTER
Brush.......................$ 35.88 21.16
FOOTNOTES:
SPRAY/SANDBLAST: $0.50 additional per hour.
EXOTIC MATERIALS: $1.25 additional per hour.
HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour.
---------------------------------------------------------------- PAIN0016-022 01/01/2021
SAN FRANCISCO COUNTY
Rates Fringes
PAINTER..........................$ 48.84 25.48
---------------------------------------------------------------- PAIN0169-001 06/01/2020
FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES:
Rates Fringes
GLAZIER..........................$ 40.00 26.76
---------------------------------------------------------------- PAIN0169-005 01/01/2021
ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN
MATEO, SANTA CLARA & SANTA CRUZ COUNTIES
Rates Fringes
GLAZIER..........................$ 53.07 31.15
---------------------------------------------------------------- PAIN0294-004 01/01/2021
FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes
PAINTER
Brush, Roller...............$ 31.36 20.33
Drywall Finisher/Taper......$ 40.10 25.00
FOOTNOTE:
Spray Painters & Paperhangers recive $1.00 additional per hour. Painters doing Drywall Patching receive $1.25
additional per hour. Lead Abaters & Sandblasters receive $1.50 additional per hour. High Time - over 30 feet (does not include work from a lift) $0.75 per hour additional.
EXHIBIT D Page 95 of 132 EXHIBIT 2 1087
---------------------------------------------------------------- PAIN0294-005 01/01/2021
FRESNO, KINGS & MADERA
Rates Fringes
SOFT FLOOR LAYER.................$ 34.55 21.67
---------------------------------------------------------------- PAIN0767-001 01/01/2021
CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
GLAZIER..........................$ 41.51 31.36
PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day.
Employee rquired to wear a body harness shall receive $1.50 per hour above the basic hourly rate at any elevation.
---------------------------------------------------------------- PAIN1176-001 07/01/2020
HIGHWAY IMPR0VEMENT
Rates Fringes
Parking Lot Striping/Highway
Marking:
GROUP 1.....................$ 38.48 16.88
GROUP 2.....................$ 32.71 16.88
GROUP 3.....................$ 33.09 16.88
CLASSIFICATIONS
GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic
stripes and markings
GROUP 2: Gamecourt & Playground Installer
GROUP 3: Protective Coating, Pavement Sealing
---------------------------------------------------------------- PAIN1237-003 01/01/2021
CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
SOFT FLOOR LAYER.................$ 41.81 23.39
---------------------------------------------------------------- PLAS0066-002 07/01/2019
ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES:
Rates Fringes
EXHIBIT D Page 96 of 132 EXHIBIT 2 1088
PLASTERER........................$ 42.41 30.73
---------------------------------------------------------------- PLAS0300-001 07/01/2018
Rates Fringes
PLASTERER
AREA 188: Fresno...........$ 32.70 31.68
AREA 224: San Benito,
Santa Clara, Santa Cruz.....$ 32.88 31.68
AREA 295: Calaveras & San
Joaquin Couonties...........$ 32.70 31.68
AREA 337: Monterey County..$ 32.88 31.68
AREA 429: Mariposa,
Merced, Stanislaus,
Tuolumne Counties...........$ 32.70 31.68
---------------------------------------------------------------- PLAS0300-005 07/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 32.15 23.27
---------------------------------------------------------------- PLUM0038-001 07/01/2021
SAN FRANCISCO COUNTY
Rates Fringes
PLUMBER (Plumber,
Steamfitter, Refrigeration
Fitter)..........................$ 79.00 46.01
---------------------------------------------------------------- PLUM0038-005 07/01/2021
SAN FRANCISCO COUNTY
Rates Fringes
Landscape/Irrigation Fitter
(Underground/Utility Fitter).....$ 67.15 32.67
---------------------------------------------------------------- PLUM0062-001 01/01/2022
MONTEREY AND SANTA CRUZ COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 47.85 38.10
---------------------------------------------------------------- PLUM0159-001 07/01/2019
CONTRA COSTA COUNTY
Rates Fringes
Plumber and steamfitter
(1) Refrigeration...........$ 56.93 41.04
(2) All other work..........$ 57.82 41.04
---------------------------------------------------------------- PLUM0246-001 01/01/2022
FRESNO, KINGS & MADERA COUNTIES
Rates Fringes
EXHIBIT D Page 97 of 132 EXHIBIT 2 1089
PLUMBER & STEAMFITTER............$ 45.15 37.19
---------------------------------------------------------------- * PLUM0246-004 01/01/2017
FRESNO, MERCED & SAN JOAQUIN COUNIES
Rates Fringes
PLUMBER (PIPE TRADESMAN).........$ 13.00 ** 10.74
PIPE TRADESMAN SCOPE OF WORK:
Installation of corrugated metal piping for drainage, as well as installation of corrugated metal piping for culverts in connection with storm sewers and drains; Grouting, dry
packing and diapering of joints, holes or chases including paving over joints, in piping; Temporary piping for dirt work for building site preparation; Operating jack hammers, pavement breakers, chipping guns, concrete saws and spades to cut holes, chases and channels for piping systems;
Digging, grading, backfilling and ground preparation for all types of pipe to all points of the jobsite; Ground
preparation including ground leveling, layout and planting of shrubbery, trees and ground cover, including watering, mowing, edging, pruning and fertilizing, the breaking of concrete, digging, backfilling and tamping for the
preparation and completion of all work in connection with lawn sprinkler and landscaping; Loading, unloading and
distributing materials at jobsite; Putting away materials in storage bins in jobsite secure storage area; Demolition of piping and fixtures for remodeling and additions;
Setting up and tearing down work benches, ladders and job shacks; Clean-up and sweeping of jobsite; Pipe wrapping and waterproofing where tar or similar material is applied for protection of buried piping; Flagman
---------------------------------------------------------------- PLUM0342-001 07/01/2021
ALAMEDA & CONTRA COSTA COUNTIES
Rates Fringes
PIPEFITTER
CONTRA COSTA COUNTY.........$ 69.95 44.00
PLUMBER, PIPEFITTER,
STEAMFITTER
ALAMEDA COUNTY..............$ 69.95 44.00
---------------------------------------------------------------- PLUM0355-004 07/01/2021
ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA,
MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, AND TUOLUMNE COUNTIES:
Rates Fringes
Underground Utility Worker
/Landscape Fitter...........$ 30.90 16.80
---------------------------------------------------------------- PLUM0393-001 07/01/2021
SAN BENITO AND SANTA CLARA COUNTIES
EXHIBIT D Page 98 of 132 EXHIBIT 2 1090
Rates Fringes
PLUMBER/PIPEFITTER...............$ 68.76 46.63
---------------------------------------------------------------- PLUM0442-001 01/01/2022
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 48.75 33.94
---------------------------------------------------------------- PLUM0467-001 07/01/2021
SAN MATEO COUNTY
Rates Fringes
Plumber/Pipefitter/Steamfitter...$ 73.10 38.61
---------------------------------------------------------------- ROOF0027-002 01/01/2022
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
ROOFER...........................$ 38.81 14.81
FOOTNOTE: Work with pitch, pitch base of pitch impregnated products or any material containing coal tar pitch, on any building old or new, where both asphalt and pitchers are used in the application of a built-up roof or tear off:
$2.00 per hour additional.
---------------------------------------------------------------- ROOF0040-002 08/01/2021
SAN FRANCISCO & SAN MATEO COUNTIES:
Rates Fringes
ROOFER...........................$ 46.38 20.94
---------------------------------------------------------------- ROOF0081-001 08/01/2021
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Roofer...........................$ 47.17 19.86
---------------------------------------------------------------- ROOF0081-004 08/01/2020
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
ROOFER...........................$ 39.73 19.11
---------------------------------------------------------------- ROOF0095-002 08/01/2020
EXHIBIT D Page 99 of 132 EXHIBIT 2 1091
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:
Rates Fringes
ROOFER
Journeyman..................$ 46.54 20.69
Kettle person (2 kettles);
Bitumastic, Enameler, Coal
Tar, Pitch and Mastic
worker......................$ 48.54 20.69
---------------------------------------------------------------- SFCA0483-001 01/01/2022
ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES:
Rates Fringes
SPRINKLER FITTER (FIRE)..........$ 70.55 35.39
---------------------------------------------------------------- SFCA0669-011 04/01/2021
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY,
SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
SPRINKLER FITTER.................$ 40.36 26.15
---------------------------------------------------------------- SHEE0104-001 07/01/2020
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA
AREA 2: MONTEREY & SAN BENITO
AREA 3: SANTA CRUZ
Rates Fringes
SHEET METAL WORKER
AREA 1:
Mechanical Contracts
under $200,000.............$ 55.92 45.29
All Other Work.............$ 64.06 46.83
AREA 2......................$ 52.90 36.44
AREA 3......................$ 55.16 34.18
---------------------------------------------------------------- SHEE0104-003 07/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES:
Rates Fringes
SHEET METAL WORKER...............$ 44.34 39.22
---------------------------------------------------------------- SHEE0104-005 07/01/2021
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
EXHIBIT D Page 100 of 132 EXHIBIT 2 1092
SHEET METAL WORKER (Excluding
metal deck and siding)...........$ 41.28 45.41
---------------------------------------------------------------- SHEE0104-007 07/01/2021
FRESNO, KINGS, AND MADERA COUNTIES:
Rates Fringes
SHEET METAL WORKER...............$ 44.07 40.79
---------------------------------------------------------------- SHEE0104-015 07/01/2020
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES:
Rates Fringes
SHEET METAL WORKER (Metal
Decking and Siding only).........$ 44.45 35.55
---------------------------------------------------------------- SHEE0104-018 07/01/2020
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
Sheet metal worker (Metal
decking and siding only).........$ 44.45 35.55
---------------------------------------------------------------- TEAM0094-001 07/01/2021
Rates Fringes
Truck drivers:
GROUP 1.....................$ 35.15 31.42
GROUP 2.....................$ 35.45 31.42
GROUP 3.....................$ 35.75 31.42
GROUP 4.....................$ 36.10 31.42
GROUP 5.....................$ 36.45 31.42
FOOTNOTES:
Articulated dump truck; Bulk cement spreader (with or without auger); Dumpcrete truck; Skid truck (debris box); Dry
pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate.
Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up
truck: Use appropriate rate for the power unit or the
equipment utilized.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2- axle unit); Nipper truck (when flat rack truck is used
appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot EXHIBIT D Page 101 of 132 EXHIBIT 2 1093
car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and
unloading); Team driver; Tool room attendant (refineries) GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit
mixers, through 10 yds.; Water trucks, under 7,000 gals.; Jetting trucks, under 7,000 gals.; Single-unit flat rack (3-axle unit); Highbed heavy duty transport; Scissor truck; Rubber-tired muck car (not self-loaded); Rubber-tired truck jumbo; Winch truck and ""A"" frame drivers; Combination winch truck with hoist; Road oil truck or bootperson;
Buggymobile; Ross, Hyster and similar straddle carriers; Small rubber-tired tractor
GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit mixers, over 10 yds.; Water trucks, 7,000 gals. and over; Jetting trucks, 7,000 gals. and over; Vacuum trucks under 7500 gals. Trucks towing tilt bed or flat bed pull
trailers; Lowbed heavy duty transport; Heavy duty transport tiller person; Self- propelled street sweeper with
self-contained refuse bin; Boom truck - hydro-lift or
Swedish type extension or retracting crane; P.B. or similar type self-loading truck; Tire repairperson; Combination bootperson and road oiler; Dry distribution truck (A
bootperson when employed on such equipment, shall receive the rate specified for the classification of road oil
trucks or bootperson); Ammonia nitrate distributor, driver and mixer; Snow Go and/or plow
GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water pulls - DW 10's, 20's, 21's and other similar equipment when pulling Aqua/pak or water tank trailers; Helicopter pilots (when transporting men and materials); Lowbedk Heavy Duty Transport up to including 7 axles; DW10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when
pulling fuel and/or grease tank trailers or other
miscellaneous trailers; Vacuum Trucks 7500 gals and over and truck repairman
GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low bed Heavy Duty Transport over 7 axles
---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================ ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage
determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is EXHIBIT D Page 102 of 132 EXHIBIT 2 1094
like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a EXHIBIT D Page 103 of 132 EXHIBIT 2 1095
new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
EXHIBIT D Page 104 of 132 EXHIBIT 2 1096
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISIO"
EXHIBIT D Page 105 of 132 EXHIBIT 2 1097
Local Assistance Procedures Manual Exhibit 12-G
Required Federal-Aid Contract Language