42893660v.16
EXHIBIT “C”
RULES AND REGULATIONS
ALL REFERENCES IN THESE RULES AND REGULATIONS SHALL REFER TO LANDLORD AND TENANT UNDER THIS LEASE.
1. Sidewalks, halls, passageways, exits, entrances, elevators, escalators and stairways shall not be obstructed by Tenant or used by Tenant for any purpose other than for ingress to and egress. The halls, passageways, exits, entrances, elevators, escalators and stairways may, at times, be made available for the use of the general public in connection with Tenant’s use of the Premises; however, Landlord shall retain the right to control and prevent access thereto by all persons whose presence, in the reasonable judgment of Landlord, shall be prejudicial to the safety, character, reputation or interests of the Building and its tenants and occupants, subject to applicable Regulations. Neither Tenant nor any of Tenant’s employees shall go upon the roof of the Building, without the prior consent of Landlord or its designate, unless such access is needed for repairs or maintenance otherwise permitted under the Lease.
2. No curtains, blinds, shades or screens shall be attached to or hung in, or used in connection with any window of the Premises (other than Landlord’s standard window covering) without Landlord’s prior consent. All electric ceiling fixtures hung in offices or spaces along the perimeter of the Building must be fluorescent, of a quality, type, design and bulb color approved by Landlord. Neither the interior nor exterior of any windows shall be coated or otherwise sunscreened without Landlord’s prior consent. Notwithstanding the foregoing, any and all lighting fixtures and window dressings that exist at the Premises as of the Commencement Date shall be deemed consented to and approved by Landlord.
3. No signs, pictures, placard, advertisement, notice, lettering, direction or handbill shall be exhibited, distributed, painted, installed, displayed, inscribed, placed or affixed by Tenant on any part of the exterior of the Premises or the interior of the Premises which is visible from the exterior of the Premises, the Building or the Project without the prior consent of Landlord. In the event of the violation of the foregoing by Tenant, Landlord may remove same without any liability, and may charge the expense incurred in such removal to Tenant. Interior signs on doors shall be inscribed, painted or affixed for Tenant by the Landlord at Tenant’s expense, and shall be of a size, color and style acceptable to Landlord. Nothing may be placed on the exterior of corridor walls or corridor doors other than Landlord’s building standard sign on the corridor door, applied and installed by Landlord.
4. The Building directory will be provided exclusively for the display of the name and location of tenants of the Building (including Tenant) and Landlord reserves the right to exclude any other names therefrom. In the event Landlord consents to an assignment or sublease, such consent shall also be deemed approval to indicate such assignee or subtenant on the Building directory.
5. Tenant shall not drill into, or in any way deface any part of the Premises; provided, that art and other decorations common to first class office buildings and technology centers may be affixed to the interior walls of the Premises by Tenant, subject to all other terms of the Lease. No boring, cutting or stringing of wires or laying of linoleum or other similar floor coverings shall be permitted, except with the prior consent of Landlord.
ATTACHMENT A 787
42893660v.16
6. No bicycles, vehicles, birds or animals of any kind shall be brought into or kept in or about the Premises or the Building, and no cooking shall be done or permitted by Tenant on the Premises, except that the preparation of coffee, tea, hot chocolate and similar items for Tenant and Tenant’s employees shall be permitted; provided, however, that the power required shall not exceed that amount which can be provided by a 30 amp circuit. Tenant shall not cause or permit the continued occurrence of any unusual or objectionable odors to be produced or to permeate the Premises or the Building.
7. The Premises shall not be used for manufacturing or for the storage of merchandise except as such storage may be incidental to the use of the Premises for general office purposes. Tenant shall not occupy or permit any portion of the Premises to be occupied as an office for a public stenographer or typist or for the manufacture or sale of liquor, narcotics, or tobacco in any form, or as a medical office unless expressly permitted in Tenant’s Lease, or as a barber or manicure shop, or as an employment bureau, or as a travel agency. Tenant shall not sell or permit the sale of newspapers, magazines, periodicals, theater tickets or any other goods or merchandise in or on the Premises. Tenant shall not engage or pay any employees in the Premises except those actually working for Tenant in the Premises nor shall Tenant advertise for laborers giving an address at the Premises. The Premises shall not be used for lodging or sleeping or for any immoral or illegal purposes.
8. Tenant shall not make or permit to be made, any unseemly noises which disturb other occupants of the Building, whether by the use of any musical instrument, radio, television, phonograph, screening room, loud, unusual or disruptive noise, or in any other way.
9. Tenant shall not use, keep or permit to be used any foul or noxious gas or substance in, on or about the Premises. If Tenant is permitted to use the Premises as a dental office, however, then Tenant may use and keep oxygen, nitrous oxide, propane, butane, ethanol, methanol, isopropyl alcohol, acrylic monomers and acetone.
10. Neither Tenant nor any of Tenant’s employees shall, at any time, bring or keep within the Premises or the Building any flammable, combustible or explosive fluids, chemical substances, or materials, except as may be expressly permitted in Article 17 hereof. Electric spaceheaters shall not be used at any time by Tenant.
11. No new or additional locks or bolts of any kind shall be placed upon any of the doors by Tenant, nor shall any changes be made in existing locks or the mechanism thereof without immediately providing Landlord with keys and other access information.
Notwithstanding the foregoing, if any areas of the Premises are separately secured and contain information Tenant is legally required to keep confidential, Tenant shall not be required to provide keys to Landlord, provided that Landlord has the access rights thereto provided in Section 18.1. Tenant must, upon the termination of its tenancy, give, return, and restore to Landlord all keys of stores, offices, vaults, and toilet rooms, either furnished to, or otherwise procured by Tenant, and in the event at any time of any loss of keys so furnished, Tenant shall pay to Landlord the cost of replacing the same or of changing the lock or locks opened by such lost key if Landlord shall deem it necessary to make such changes.
12. Furniture, freight, pictures, equipment, safes, bulky matter or supplies of any description shall be moved in or out of the Building only, after Landlord (or its designate) has been furnished with prior notice and given its approval and only during such hours and in such manner as may be prescribed by Landlord from time to time. The scheduling and manner of ATTACHMENT A 788
42893660v.16
Tenant’s move-ins and move-outs shall be subject to the discretion and approval of Landlord, and said move-ins and move-outs shall only take place after 6:00 P.M. on weekdays, on weekends, or such other times as Landlord may designate. In the event Tenant’s movers damage the elevator or any other part of the Project, Tenant shall immediately pay to Landlord the amount required to repair said damage. The moving of safes or other fixtures or bulky or heavy matter of any kind must be done under the supervision of Landlord (or its designate), and the person employed by Tenant for such work must be acceptable to Landlord, but such persons shall not be deemed to be agents or servants of Landlord (or its designate), and Tenant shall be responsible for all acts of such persons. Landlord reserves the right to inspect all safes, freight or other bulky or heavy articles to be brought into the Building and to exclude from the Building all safes, freight or other bulky or heavy articles which violate any of these Rules or Regulations or the Lease of which these Rules and Regulations are a part. Landlord reserves the right to determine the location and position of all safes, freight, furniture or bulky or heavy matter brought onto the Premises, which must be placed upon supports approved by Landlord to distribute the weight.
13. No furniture shall be placed in front of the Building or in any lobby or corridor, without Landlord’s prior written consent. Landlord shall have the right to remove all nonpermitted furniture, without notice to Tenant, and at the expense of Tenant.
14. Landlord shall have the right to prohibit any advertising by Tenant which, in Landlord’s opinion, tends to impair the reputation of the Building or the Project or the desirability thereof as an office building project and, upon written notice from Landlord, Tenant shall immediately refrain from or discontinue such advertising, unless such advertising is required by the Regulations.
15. Landlord reserves the right to exclude from the Building between the hours of 6:30 P.M. and 6:30 A.M., Monday through Friday, and at all hours on Saturday, Sunday, state and federal holidays, all persons who are not authorized by Tenant. Tenant shall be responsible for all persons for whom it causes to be present in the Building and shall be liable to Landlord for all acts of such persons. In the case of invasion, riot, public excitement, act of God, or other circumstance rendering such action advisable in Landlord’s opinion, Landlord reserves the right to prevent access of all persons (including Tenant) to the Building during the continuance of the same by such actions as Landlord may deem appropriate, including the closing and locking of doors, to the extent permitted under applicable Regulations.
16. Any persons employed by Tenant to do any work in or about the Premises shall, while in the Building and outside of the Premises, be subject to and under the control and discretion of Landlord’s designate (i.e., the superintendent or manager of the Building) but shall not be deemed to be an agent or servant of said superintendent or the Landlord, and Tenant shall be responsible for all acts of such persons.
17. Tenant shall cooperate in keeping closed all doors opening onto public corridors, except when in use for ingress and egress. Tenant shall cooperate in keeping closed all doors leading to equipment and utility rooms. Tenant shall see that its doors are closed and securely locked before leaving the Project. Notwithstanding the foregoing, the location of all office equipment of any electrical nature that is within the Premises as of the Commencement Date shall be deemed to be approved by Landlord.
ATTACHMENT A 789
42893660v.16
18. Canvassing, soliciting and peddling in the Building are prohibited and Tenant shall cooperate to prevent the same.
19. All office equipment of any electrical nature shall be placed by Tenant in the Premises in settings and locations approved by Landlord, to absorb or prevent any vibration, noise and annoyance.
20. No air conditioning unit or other similar apparatus shall be installed or used by Tenant without Landlord’s prior consent. Tenant shall cooperate with Landlord in obtaining maximum effectiveness of the HVAC system by closing blinds when the sun’s rays fall directly on windows. Tenant shall not obstruct, alter, or in any way impair the efficient operation of the HVAC system.
21. Tenant shall faithfully observe and comply with the terms of any and all covenants, conditions and restrictions recorded against the Project (i) prior to the Commencement Date and (ii) subsequent to the Commencement Date; provided, that such compliance shall only be required of Tenant (a) after such time as Tenant has been provided with written notice and a copy of such covenants, conditions and restrictions and (b) if compliance does not interfere with Tenant’s Permitted Uses and is not required by applicable Regulations.
22. Restrooms and other water fixtures shall not be used for any purpose other than that which the same are intended, and any damage resulting to the same from misuse on the part of Tenant or Tenant’s employees shall be paid for by Tenant. Tenant shall be responsible for causing all water faucets, water apparatus and utilities, including, but not limited to all electricity, gas and air, to be shut off before Tenant or Tenant’s employees leave the Premises each day and Tenant shall be liable for any waste or damage sustained by other tenants or occupants of the Building or Landlord as a result of Tenant’s failure to perform said duty.
23. In the event that Building or the Premises is or later becomes equipped with an electronic access control device, Tenant shall pay to Landlord the actual cost of each identification key or card issued to Tenant as a deposit against the return of the identification key or card to Landlord.
24. Tenant shall not cause any unnecessary labor by reason of Tenant’s carelessness or indifference in the preservation of good order and cleanliness. Landlord shall not be responsible to Tenant for any loss of property on the Premises, however occurring, or for any damage done to the effects of Tenant by the janitor or another employee or any other person.
Except as otherwise provided in the Lease or any Exhibit thereto, janitor service shall include ordinary dusting and cleaning by the janitor or any assigned to such work and shall not include shampooing of carpets or rugs or moving of furniture or other special services. Janitor service will not be furnished on nights when rooms are occupied after 10:00 p.m. Window cleaning shall be done only by Landlord.
25. Tenant shall not permit any of its principals, employees, agents, contractors or invitees to smoke at any time in the Building.
26. Except as otherwise provided in the Lease, all parking ramps and areas plus other public areas forming a part of the Project shall be under the sole and absolute control of Landlord with the exclusive right to regulate and control these areas; provided, that such regulation and control shall not limit any of Tenant’s rights expressly granted under this Lease beyond any ATTACHMENT A 790
42893660v.16
limitation that may otherwise be set forth herein. Tenant agrees to conform to any additional rules and regulations that may be established by Landlord for these areas from time to time.
27. Employees of Landlord or Landlord’s agents shall not be obligated to perform any work or do anything outside of their regular duties unless under special instructions from Landlord.
28. In the event of any conflict between these Rules and Regulations and the Lease, the Lease shall prevail.
ATTACHMENT A 791
Exhibit D
42893660v.16
EXHIBIT “D”
ESTOPPEL CERTIFICATE
[SEE ATTACHED]
ATTACHMENT A 792
42893660v.16
ESTOPPEL CERTIFICATE
The undersigned [[**Insert Requested Party Information (the “Requested Party”)**]], hereby certifies to [[**Insert Requesting Party Information (the Requesting Party”)**]], that:
1. The City of Stockton, a municipal corporation (“Tenant”), is the lessee of certain space in that certain office building located at 400 East Main Street, Stockton, California 95202 (the “Building”), containing approximately ________ rentable square feet on the first, third, fourth and seventh floors thereof (the “Premises”), under a lease dated ___________________, 201__ (the “Lease”) entered into between Tenant and _____________________, as Receiver (“Landlord”).
2. The Lease is presently in full force and effect. [[**The Requested Party**]] has performed and complied with all obligations of the Requested Party through the date hereof, and there exists no default by the [[**Requested Party**]] except .
3. The Lease, in the form of Exhibit A attached hereto, constitutes the entire agreement between Landlord and Tenant and there has been no amendment, modification or supplement, written or oral, to the Lease except as included in Exhibit A. Tenant does not have any options to purchase the Premises.
4. Tenant is in full and complete possession and occupancy of the Premises, has accepted the Premises, including any work to date of Landlord performed thereon pursuant to the terms and provisions of the Lease, and Tenant is paying rent under the Lease. Landlord has performed all of its obligations under the Lease for the current term with respect to tenant improvements.
5. The term of the Lease commenced on June 1, 2014 and will end on ________________________, with two options to extend the Lease for successive periods of two years each. The monthly rental is currently $_______ per rentable square foot per month.
6. The monthly rental for fiscal year _____ - _____ (July 1 – June 30) is _____________________________ Dollars ($__________) and is due on the ____ day of each month. All additional rent and any other charges payable under the Lease have been paid for the current periods. No rent has been paid more the thirty (30) days in advance. Tenant is not in arrears of any monthly base rent or additional rent.
7. As of the date of this certificate, [[**the Requesting Party**]] is not in default under the Lease.
8. The amount of the security deposit paid under the terms of the Lease is Two Hundred Nine Thousand Three Hundred Fourteen and 78/100 Dollars ($209,314.78).
9. The Tenant has not entered into any sublease, assignment, pledge, mortgage, transfer or otherwise conveyed all or any portion of its interest in the Lease or the Premises except as follows: _________________________________.
ATTACHMENT A 793
42893660v.16
10. Landlord has not made any loans or advanced funds to Tenant.
11. All guarantors of the Lease are identified as:
________________________________N/A__________________________________________.
12. Attached is a true and correct copy of the Lease together with all amendments, modifications or renewals.
13. All exhibits attached hereto are by this reference incorporated fully herein.
The terms “this certificate” shall be considered to include all such exhibits. The undersigned makes this statement for Landlord’s benefit and protection with the understanding that Landlord and its lender, if any, intend to rely upon this statement. This certificate may be relied upon by Landlord, Landlord’s lender and their respective successors and assigns, and this certificate shall be binding upon Tenant, any guarantor of Tenant and each of their respective successors and assigns.
[Signatures continue on next page]
ATTACHMENT A 794
42893660v.16
EXECUTED: _________ __, 20__ [[**Requesting Party**]]:
By:
Name:
Title:
ATTACHMENT A 795
42893660v.16
EXHIBIT “E”
LOCATION OF RESERVED SPACES
[SEE ATTACHED]
ATTACHMENT A 796
ATTACHMENT A 797
ATTACHMENT A 798
42893660v.16
EXHIBIT “F”
DEPICTION OF BUILDING STANDARD SIGNAGE
[SEE ATTACHED]
ATTACHMENT A 799
Exhibit F
Signage will be the building standard raised chrome block lettering in a size to match existing building signage at the north entrance to the Building reading “Four Hundred”. Photo included below.
ATTACHMENT A 800
ATTACHMENT B 801
ATTACHMENT B 802
ATTACHMENT B 803
ATTACHMENT B 804
ATTACHMENT B 805
ATTACHMENT B 806
ATTACHMENT B 807
ATTACHMENT B 808
ATTACHMENT B 809
Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A SECOND
LEASE AMENDMENT WITH CHRIS NEILSON, AS DULY APPOINTED RECEIVER (LANDLORD), FOR 400 EAST MAIN STREET
The City purchased the Waterfront Office Towers at 501 and 509 West Weber Avenue in January 2018, to serve as the City’s future City Hall; and The City no longer needs the seventh floor space it is currently leasing at 400 East Main Street; and
Landlord has agreed to execute a Second Lease Amendment reducing the space the City is leasing by 9,344 SF and to extend the lease term through March 31, 2025; and Reducing the space leased by the City will result in significant savings to the City; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The City Manager is hereby authorized to execute a Second Lease Amendment between the City of Stockton and Chris Neilson, duly appointed Receiver (Landlord), for 400 East Main Street, attached as Exhibit 1 and incorporated by this reference.
2. The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED February 7, 2023 .
KEVIN J. LINCON II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
810
12718949.6 1 400 East Main Street
Second Amendment (City of Stockton)
SECOND AMENDMENT TO STANDARD OFFICE LEASE
(400 East Main Street)
This Second Amendment to Standard Office Lease (400 East Main Street), dated as of _____________ __, 2023 (this “Second Amendment”) is by and between CHRIS NEILSON, duly appointed Receiver (“Landlord”), and THE CITY OF STOCKTON, a municipal corporation (“Tenant”), with reference to the following:
RECITALS
A. Pursuant to that certain (i) Standard Office Lease, dated February 25, 2015, by and between Landlord and Tenant, and (ii) First Amendment to Standard Office Lease, dated October 18, 2018, by and between Landlord and Tenant (collectively, the “Original Lease”), Landlord leases the Premises (as more specifically defined in the Original Lease, which shall hereinafter be referred to herein as the “Original Premises”) to Tenant. Each initially capitalized term not otherwise defined herein shall have the meaning set forth for such term in the Original Lease.
B. Landlord and Tenant desire to decrease the size of the Original Premises leased to Tenant pursuant to the Original Lease and to amend and modify certain other provisions and conditions of the Original Lease, all as more specifically set forth herein. Except as expressly amended or modified by the provisions and conditions of this Second Amendment, it is intended by Landlord and Tenant that the Original Lease shall remain unchanged and otherwise in full force and effect. The Original Lease, as modified by the terms of this Second Amendment, shall hereinafter be referred to as the “Lease”.
AGREEMENT
NOW, THEREFORE, Landlord and Tenant hereby agree as follows:
1. Defined Terms. The meaning of certain defined terms in the Original Lease shall be modified as follows:
(a) Premises. Effective as of March 31, 2023 (the “Relinquished Premises Effective Date”), the term “Premises” shall mean (i) a portion of the third (3rd) floor of the Building consisting of approximately 25,755 rentable square feet, commonly known as Suite 310 and (ii) the entire fourth (4th) floor of the Building consisting of approximately 25,730 rentable square feet, commonly known as Suite 400, for a total Premises, as of the Relinquished Premises Effective Date, comprised of 51,485 rentable square feet ((i) and (ii) collectively, as used in this Second Amendment, the “Retained Premises”). From and after the Relinquished Premises Effective Date, the term “Premises”, as used in the Original Lease (including as such Original Lease is amended by this Second Amendment), shall mean the Retained Premises.
The Retained Premises is shown on Exhibit A attached hereto and made a part hereof.
Landlord and Tenant accept the calculation of 51,485 rentable square feet for the Retained Premises. (b) Lease Expiration Date; Term. Subject to Section 2 and Section 3, below, effective as of the date hereof, March 31, 2025 shall hereinafter be referred to as the “Lease Expiration Date”. The period beginning on February 25, 2015 and ending on the Lease Expiration Date (as such date may be further amended as set forth in this Second Amendment) shall hereinafter be referred to as the “Term”.
EXHIBIT 1 811
12718949.6 2 400 East Main Street
Second Amendment (City of Stockton)
(c) Basic Monthly Rent. Subject to Section 2 and Section 3 below, beginning on the date immediately following the Relinquished Premises Effective Date, Basic Monthly Rent for the Retained Premises shall be as follows:
Period Basic Monthly Rent Gross Annual Rent
April 1, 2023-March 31, 2025 $80,081.23 $960,974.76
2. Month-to-Month Extension Rights. Notwithstanding the Lease Expiration Date set forth in Section 1(b) above, Tenant shall have the right to extend the Lease Term on a month-to-month basis (the “Month-to-Month Extension Right” and such portion of the Term the “MTM Extension Term”), such MTM Extension Term to begin on the date immediately following the Lease Expiration Date (as defined in this Second Amendment) and shall continue until the earlier of (i) the date elected by Tenant in the Extension Exercise Notice or (ii) June 30, 2025 (the “Outside Lease Expiration Date”). If Tenant wishes to exercise the Month-to-Month Extension Right, then Tenant must provide written notice to Landlord of same no less than ninety (90) days prior to the Lease Expiration Date (the “Extension Exercise Notice”). The Extension Exercise Notice must expressly state Tenant’s newly elected Lease Expiration Date, which date cannot be after the Outside Lease Expiration Date. If Tenant’s Extension Exercise Notice reflects a new Lease Expiration Date that is prior to the Outside Lease Expiration Date, then Tenant may deliver another Extension Exercise Notice no later than ninety (90) days prior to the new Lease Expiration Date to further extend the MTM Extension Term on a month-tomonth basis, subject to the Outside Lease Expiration Date. Basic Monthly Rent for all or any portion of the MTM Extension Term shall be equal to the Basic Monthly Rent amount owed by Tenant to Landlord for the last month of the Term immediately preceding the first day of the MTM Extension Term, subject to Section 3 below, with respect to Tenant’s right to elect the Premises Reduction Option, if applicable, and the corresponding Basic Monthly Rent reduction that would result therefrom.
3. Early Termination Option. Notwithstanding the Lease Expiration Date set forth in Section 1(b) above, at any time after September 1, 2024, Tenant shall have the option to (i) reduce the Premises by relinquishing the entirety of the Premises located on the third (3rd) or fourth (4th) floor of the Building (the “Premises Reduction Option”) or (ii) terminate the Lease in its entirety with respect to all of the Premises (the “Early Termination Option”). For the avoidance of doubt, to exercise the Premises Reduction Option, Tenant must be willing to reduce the Premises by no less than the entire portion of the Premises located on any one floor. If Tenant wishes to exercise the Premises Reduction Option or the Early Termination Option, then Tenant must provide Landlord with written notice of same no less than forty-five (45) days prior to the date Tenant wishes for such option to go into effect (the “Early Termination Notice”), which Early Termination Notice must expressly state (i) that Tenant elects to exercise either the Premises Reduction Option or the Early Termination Option, as applicable, (ii) if Tenant elects to exercise the Premises Reduction Option, whether Tenant is electing to relinquish all of the Premises on the third (3rd) floor or the fourth (4th) floor, and (iii) the date upon which Tenant will relinquish all or the applicable portion of the Premises, as applicable, which date shall be (a) no less than forty-five (45) days after such Early Termination Notice is delivered to Landlord and (b) the last day of a calendar month (the “Give-Back Date”). Provided, Tenant delivers the Early Termination Notice to Landlord in the form, and within the time period, required by this Section 3, and Tenant vacates all or the applicable portion of the Premises, as applicable, no later than the Give-Back Date, then the Lease shall terminate in its entirety or in part, as applicable, as of such Give-Back Date, and Tenant shall have EXHIBIT 1 812
12718949.6 3 400 East Main Street
Second Amendment (City of Stockton)
no further obligation under the Lease in connection with all or such portion of the Premises, as applicable. If Tenant elects to exercise the Premises Reduction Option, then (i) Basic Monthly Rent shall be reduced by Forty Thousand Fifty Six and 73/100 Dollars ($40,056.73) beginning on the first day of the month immediately following the Give-Back Date, (ii) the Tenant Spaces and the Reserved Spaces allocated to Tenant in accordance with Item 10 of the Basic Lease Provisions shall be proportionately reduced based on the portion of the Premises relinquished as a result of Tenant exercising the Premises Reduction Option, (iii) Landlord and Tenant shall promptly enter into an amendment to the Lease to reflect the reduction of the (a) Premises, (b) Basic Monthly Rent and (c) Tenant Spaces and Reserved Spaces as a result of Tenant exercising the Premises Reduction Option in accordance with the terms hereof and (iv) Tenant may, at a later date, exercise the Early Termination Option by relinquishing the remainder of the Premises located on the floor that was not relinquished on the Give-Back Date; provided, Tenant exercises the Early Termination Option in accordance with the terms of this Section 3.
4. Parking.
(a) Effective as of the Relinquished Premises Effective Date, Item 10 of the Basic Lease Provisions shall be deleted in its entirety and replaced with the following:
“10. PARKING: As part of Tenant’s consideration under this Lease, Tenant shall be entitled to ninety-five (95) parking spaces located in the Parking Garage during the Term of this Lease (collectively, “Tenant’s Spaces”), of which sixty-nine (69) of Tenant’s Spaces shall be unreserved parking spaces and twenty-six (26) of Tenant’s Spaces shall be reserved parking spaces (such Tenant’s Spaces, the “Reserved Spaces”). The Reserved Spaces shall be located within that portion of the Parking Garage depicted on Exhibit “E” attached hereto and made a part hereof; provided, however, that Landlord shall have the right to temporarily relocate such Reserved Spaces for purposes of maintaining, repairing, restoring, altering or improving the Parking Garage and maintaining the safety of the Parking Garage and/or the Project. Landlord reserves the right to separately charge Tenant’s guests and visitors for parking; provided, however, that Tenant’s visitors shall be permitted to use, at no additional charge, any of Tenant’s Spaces that are not being used by Tenant at the time such visitor wishes to park at the Building, as determined by Landlord (or any agent or employee thereof) in its reasonable discretion.”
As of the date hereof, Exhibit “E” attached to the Original Lease is hereby deleted in its entirety and replaced with Exhibit E attached hereto and made a part hereof. (b) Effect of Prior Parking Provisions. Landlord and Tenant hereby acknowledge and agree that any provisions contained in the Original Lease, to the extent contrary to, or inconsistent with, the provisions of Section 4(a) above shall be deemed amended by the provisions of Section 4(a) above.
5. Extension Options. Landlord and Tenant hereby acknowledge and agree that Tenant’s Extension Option rights, as contained in Section 1.2 of the Original Lease, shall be deleted in their entirety and of no further force or effect. For the avoidance of doubt, Landlord and Tenant acknowledge and agree that from and after the date of this Amendment, Tenant shall not have any right to extend the Term of the Lease, except as may be expressly set forth in this Second Amendment.
EXHIBIT 1 813
12718949.6 4 400 East Main Street
Second Amendment (City of Stockton)
6. Conditions Precedent. Notwithstanding anything to the contrary contained herein, the effectiveness of this Amendment is conditioned on Tenant executing and delivering to Landlord, concurrently with the execution of this Second Amendment, an amendment to that certain (i) Real Property Option Agreement and Joint Escrow Instructions (the “Option Agreement”), dated February 25, 2015, by and between Tenant, as Optionor, and Four Hundred Main Street LLC, an affiliate of Landlord (“Four Hundred Main”), as Optionee (the “Option Amendment”), and (ii) Memorandum of Option Agreement, dated February 25, 2015, between Tenant, as Optionor, and Four Hundred Main, as Optionee, recorded on April 21, 2015, in the real property records of San Joaquin County, California (the “Real Property Records”), as Instrument Number 2015-044221, which amendment shall be recorded in the Real Property Records (the “Memo Amendment” and, together with the Option Amendment, collectively, the “Required Option Amendments”), in the forms attached hereto as Exhibit B-1 and Exhibit B-2, respectively. If Tenant does not deliver to Landlord an executed original of each Required Option Amendment concurrently with Tenant’s delivery of its signature to this Second Amendment, then this Second Amendment shall be null and void and of no further force or effect. Landlord and Tenant acknowledge and agree that upon execution and delivery by Landlord and Tenant of the Memo Amendment, Landlord shall cause the Memo Amendment to be recorded in the Real Property Records.
7. Brokers. Landlord has entered into an agreement with CBRE, Inc. (“Landlord’s Broker”), pursuant to which Landlord has granted to Landlord’s Broker the exclusive right to lease space in the Building. Landlord shall pay any commissions or fees that are payable to Landlord’s Broker with respect to this Second Amendment in accordance with the provisions of a separate commission contract.
Landlord shall have no further or separate obligation for the payment of commissions or fees to any other real estate broker, finder or intermediary. Tenant represents that it has not had any dealings with any real estate broker, finder or intermediary with respect to this Second Amendment, other than Landlord’s Broker. Subject to the foregoing, each party hereto shall indemnify and hold harmless the other party hereto from and against any and all damages, liabilities, losses, costs and expenses (including, but not limited to, reasonable attorneys’ fees and related costs) resulting from any claims that may be asserted against such other party by any real estate broker, finder or intermediary other than Landlord’s Broker, arising from any act of the indemnifying party in connection with this Second Amendment.
8. Release; Waiver. Tenant, on behalf of itself, and its officials, officers, agents, employees and/or other representatives, as of the date hereof, hereby discharges and releases Landlord, and its members, officers, shareholders, divisions, subsidiaries, agents, managers, contractors, servants, employees and invitees, except to the extent of such party’s recklessness or willful misconduct, from all of its past and future claims, demands, damages, obligations, losses, liabilities, costs and expenses (including attorneys' fees and expenses) directly or indirectly related to or arising out of or in connection with the Original Lease. Tenant expressly waives the provisions of California Civil Code Section 1542, which provides:
"A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS WHICH THE CREDITOR
DOES NOT KNOW OR SUSPECT TO EXIST IN HIS OR HER FAVOR AT THE TIME
OF EXECUTING THE RELEASE, WHICH IF KNOWN BY HIM OR HER MUST HAVE MATERIALLY AFFECTED HIS OR HER SETTLEMENT WITH THE DEBTOR."
9. No Further Modification. Except as specifically set forth in this Second Amendment, all of the terms and provisions of the Original Lease remain unmodified and in full force and effect, and, except as expressly amended or modified hereby, all terms and provisions of the Original Lease are EXHIBIT 1 814
12718949.6 5 400 East Main Street
Second Amendment (City of Stockton)
hereby incorporated herein by reference thereto. Notwithstanding the foregoing, Landlord hereby reserves all rights and remedies Landlord may have as to the date hereof arising from any acts or omissions of Tenant occurring under the Original Lease. All references to the “Lease” in the Original Lease shall mean the Original Lease, as amended by this Second Amendment.
10. Estoppel. As of the date hereof, Tenant acknowledges and agrees that Landlord has performed all obligations required of Landlord under the Lease, and there are no offsets, counterclaims or defenses of Tenant under the Original Lease existing against Landlord. Tenant further acknowledges and agrees that no events have occurred that, with the passage of time or the giving of notice, or both, would constitute a basis for an offset, counterclaim or defense against Landlord, and that the Original Lease, as amended hereby, is in full force and effect.
11. Counterparts. This Second Amendment may be executed in multiple counterparts, each of which shall be deemed an original, but all of which, taken together, shall constitute one and the same instrument. The parties hereto agree to accept a digital image of this Second Amendment, as transmitted via facsimile, email or other electronic means, as executed, as a true and correct original and admissible as best evidence for the execution and delivery of same by the parties hereto. [Signatures Continue on Next Page]
EXHIBIT 1 815
Signature Page 400 East Main Street
Second Amendment (City of Stockton)
IN WITNESS WHEREOF, the undersigned have executed this Second Amendment as of the first date written above.
LANDLORD
CHRIS NEILSON,
as Receiver and Successor-in-Interest to
MAIN STREET STOCKTON LLC,
a Delaware limited liability company,
and William J. Hoffman, as receiver
By:
CHRIS NEILSON
TENANT
THE CITY OF STOCKTON,
a municipal corporation
By: ______________________________
Name:
Title:
EXHIBIT 1 816
Exhibit A 400 East Main Street
Second Amendment (City of Stockton)
EXHIBIT A
Depiction of Retained Premises
[See Attached]
EXHIBIT 1 817
EXHIBIT 1 818
EXHIBIT 1 819
Exhibit B-1 400 East Main Street
Second Amendment (City of Stockton)
EXHIBIT B-1
Form of Option Amendment
[See Attached]
EXHIBIT 1 820
12718949.6 1 400 East Main Street
First Amendment (Option Agreement)
FIRST AMENDMENT TO REAL PROPERTY OPTION AGREEMENT AND JOINT ESCROW INSTRUCTIONS This First Amendment to Real Property Option Agreement and Joint Escrow Instructions, dated as of _____________ __, 2023 (this “First Amendment”) is by and between THE CITY OF STOCKTON, a municipal corporation (“Optionor”), and FOUR HUNDRED MAIN STREET LLC, a Delaware limited liability company (“Optionee”), with reference to the following:
RECITALS
A. Pursuant to that certain Real Property Option Agreement and Joint Escrow Instructions, dated as of February 25, 2015, between Optionor and Optionee (collectively, the “Original Option Agreement”), Optionor granted to Optionee an option to purchase the Property (as defined in the Original Option Agreement), all as more specifically set forth in the Original Option Agreement. Each initially capitalized term not otherwise defined herein shall have the meaning set forth for such term in the Original Option Agreement.
B. Optionor and Optionee desire to extend the Expiration Date of the Option Term, all as more specifically set forth herein. Except as expressly amended or modified by the provisions and conditions of this First Amendment, it is intended by Optionor and Optionee that the Original Option Agreement shall remain unchanged and otherwise in full force and effect. The Original Option Agreement, as modified by the terms of this First Amendment, shall hereinafter be referred to as the “Option Agreement”.
AGREEMENT
NOW, THEREFORE, Optionor and Optionee hereby agree as follows:
1. Defined Terms. The meaning of certain defined terms in the Original Option Agreement shall be modified as follows:
(a) Option Term. Effective as of the date of this First Amendment, the Option Term shall mean the period of time that begins on the Effective Date and ends at 5:00 p.m. Pacific Standard Time on the Lease Expiration Date (as such term is defined in that certain Standard Office Lease, dated February 25, 2015, by and between William J. Hoffman, as Receiver for the benefit of Optionee, as “Landlord”, and Optionor, as “Tenant”, which was amended by that certain (i) First Amendment to Standard Office Lease, dated October 18, 2018 and (ii) Second Amendment to Standard Office Lease, dated January __, 2023 (collectively, the “City Lease”)), as the Lease Expiration Date may be extended, pursuant to the terms of the City Lease (the “Expiration Date”). The Lease Expiration Date is currently March 31, 2025, however Optionor, as Tenant, has a right to extend the Lease Term on a month-tomonth bases until June 30, 2025, as more specifically set forth in the City Lease. (b) Expiration Date. Effective as of the date of this First Amendment, the Expiration Date shall have the meaning set forth for such term in clause 1(a) directly above. For the avoidance of doubt, (i) the Option Term shall run concurrently with the City Lease Term, (ii) the Option Term Expiration Date shall be the same date as the Lease Expiration Date (as the same may be extended or sooner terminated pursuant to the terms of the City Lease), and the Option Term Expiration Date shall be automatically extended to the new Lease Expiration Date in the event Optionor extends the City Lease Term or shall terminate early in the event Optionor elects to terminate the City Lease prior to the EXHIBIT 1 821
12718949.6 2 400 East Main Street
First Amendment (Option Agreement)
Lease Expiration Date or the City Lease is otherwise terminated early, in each case pursuant to the terms thereof.
2. No Further Modification. Except as specifically set forth in this First Amendment, all of the terms and provisions of the Original Option Agreement remain unmodified and in full force and effect, and, except as expressly amended or modified hereby, all terms and provisions of the Original Option Agreement are hereby incorporated herein by reference thereto. All references to “the Agreement” or “this Agreement” in the Original Option Agreement shall mean the Original Option Agreement, as amended by this First Amendment.
3. Governing Law. This First Amendment shall be governed by and construed in accordance with the laws of the State of California, without reference to choice of law doctrines.
4. Counterparts. This First Amendment may be executed in multiple counterparts, each of which shall be deemed an original, but all of which, taken together, shall constitute one and the same instrument. The parties hereto agree to accept a digital image of this First Amendment, as transmitted via facsimile, email or other electronic means, as executed, as a true and correct original and admissible as best evidence for the execution and delivery of this First Amendment by the parties hereto. [Signatures Continue on Next Page]
EXHIBIT 1 822
12718949.6 Signature Page 400 East Main Street
First Amendment (Option Agreement)
IN WITNESS WHEREOF, the undersigned have executed this First Amendment as of the first date written above.
OPTIONOR:
THE CITY OF STOCKTON,
a municipal corporation
By: ______________________________
Name:
Title:
[Signatures Continue on Next Page]
EXHIBIT 1 823
12718949.6 Signature Page 400 East Main Street
First Amendment (Option Agreement)
OPTIONEE:
FOUR HUNDRED MAIN STREET LLC,
A Delaware limited liability company
By: ______________________________
Name:
Title:
EXHIBIT 1 824
Exhibit B-2 400 East Main Street
Second Amendment (City of Stockton)
EXHIBIT B-2
Form of Memo Amendment
[See Attached]
EXHIBIT 1 825
12718949.6 1 400 East Main Street
First Amendment (Memo of Option Agreement)
FIRST AMENDMENT TO MEMORANDUM OF OPTION AGREEMENT
This First Amendment to Memorandum of Option Agreement, dated as of _____________ __, 2023 (this “First Amendment”) is by and between THE CITY OF STOCKTON, a municipal corporation (“Optionor”), and FOUR HUNDRED MAIN STREET LLC, a Delaware limited liability company (“Optionee”), with reference to the following:
RECITALS
A. Pursuant to that certain Real Property Option Agreement and Joint Escrow Instructions, dated as of February 25, 2015 , between Optionor and Optionee (the “Original Option Agreement”), Optionor granted to Optionee an option to purchase certain real property as more specifically set forth therein.
B. The Original Option Agreement is evidenced by a Memorandum of Option Agreement, recorded April 21, 2015 in the real property records of San Joaquin County, California, as Instrument Number 2015-044221 (the “Memo of Option Agreement”). Each initially capitalized term not otherwise defined herein shall have the meaning set forth for such term in the Original Option Agreement.
C. On or about the date hereof, Optionor and Optionee entered into that certain First Amendment to Real Property Option Agreement and Joint Escrow Instructions (the “Option Agreement Amendment”) for the purpose of extending the term of the Original Option Agreement (the “Option Term”).
D. Optionor and Optionee desire to amend the Memo of Option Agreement to reflect that the expiration date of the Option Term has been amended, pursuant to the terms of the Option Agreement Amendment. Except as expressly amended or modified by the provisions and conditions of this First Amendment, it is intended by Optionor and Optionee that the Memo of Option Agreement shall remain unchanged and otherwise in full force and effect.
AGREEMENT
NOW, THEREFORE, for and in consideration of the mutual covenants hereinafter contained, Optionor and Optionee hereby amend the Memo of Option Agreement as follows:
1. The Option Term shall expire on the expiration date of that certain Standard Office Lease, dated February 25, 2015, by and between William J. Hoffman, as Receiver for the benefit of Optionee, as “Landlord’, and Optionor, as “Tenant”, which was amended by that certain (i) First Amendment to Standard Office Lease, dated October 18, 2018 and (ii) Second Amendment to Standard Office Lease, dated January __, 2023 (collectively, the “City Lease”)), as the such expiration date may be extended, pursuant to the terms of the City Lease (the “Expiration Date”). The expiration date of the City Lease is currently March 31, 2025, however Optionor, as “Tenant” under the City Lease, has a right to extend the term of the City Lease on a month-to-month bases until June 30, 2025, as more specifically set forth in the City Lease. For the avoidance of doubt, (i) the Option Term shall run concurrently with the term of the City Lease, (ii) the expiration date of the Option Term shall be the same date as the City Lease expiration date (as the same may be extended or sooner terminated pursuant to the terms of the City Lease), and the expiration date of the Option Term (a) shall be automatically extended to the new Lease expiration date, in the event Optionor, as “Tenant”, extends the term of the City Lease or (b) shall EXHIBIT 1 826
12718949.6 2 400 East Main Street
First Amendment (Memo of Option Agreement)
automatically terminate, in the event Optionor elects to terminate the City Lease prior to the City Lease expiration date or the City Lease is otherwise terminated early, in each case pursuant to the terms thereof.
2. Except as specifically set forth in this First Amendment, all of the terms and provisions of the Memo of Option Agreement remain unmodified and in full force and effect.
3. This First Amendment may be executed in multiple counterparts, each of which shall be deemed an original, but all of which, taken together, shall constitute one and the same instrument. [Signatures Continue on Next Page]
EXHIBIT 1 827
12718949.6 Signature Page 400 East Main Street
First Amendment (Memo of Option Agreement)
IN WITNESS WHEREOF, the undersigned have executed this First Amendment as of the first date written above.
OPTIONOR:
THE CITY OF STOCKTON,
a municipal corporation
By: ______________________________
Name:
Title:
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF )
)ss
COUNTY OF )
On _______________, 202_ before me, ________________________________, a Notary Public in and for said County and State, personally appeared, __________________, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that she/he executed the same in his/her authorized capacity, and that by his/her signature on the instrument, the entity upon behalf of which the person acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of ________________ that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature: ___________________________________
[Signatures Continue on Next Page]
EXHIBIT 1 828
12718949.6 Signature Page 400 East Main Street
First Amendment (Memo of Option Agreement)
OPTIONEE:
FOUR HUNDRED MAIN STREET LLC,
A Delaware limited liability company
By: ______________________________
Name:
Title:
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF )
)ss
COUNTY OF )
On _______________, 202_ before me, ________________________________, a Notary Public in and for said County and State, personally appeared, __________________, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that she/he executed the same in his/her authorized capacity, and that by his/her signature on the instrument, the entity upon behalf of which the person acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of ________________ that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature: ___________________________________
EXHIBIT 1 829
12718949.6 Exhibit E 400 East Main Street
Second Amendment (City of Stockton)
EXHIBIT E
Location of Reserved Spaces
[See Attached]
EXHIBIT 1 830
EXHIBIT 1 831
EXHIBIT 1 832
City of Stockton
Legislation Text
File #: 23-0009, Version: 1
ADOPT A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A LEASE AMENDMENT WITH THE STOCKTON SAILING CLUB AT 4980 BUCKLEY COVE WAY
RECOMMENDATION
It is recommended that the City Council adopt a resolution to:
1. Authorize the City Manager, or designee, to execute a lease amendment with the Stockton Sailing Club; and
2. Authorize the City Manager, or designee, to take appropriate and necessary actions to carry the purpose and intent of the Resolution.
Summary
This action will authorize the City Manager, or designee, to execute the first (1st) lease amendment (attached as Exhibit 1 to the Resolution), with the Stockton Sailing Club (Sailing Club), for the property located at 4980 Buckley Cove Way (Attachment A - Vicinity Map). The proposed amendment will extend the lease by five additional years, for a new total of fifty-five years (the maximum allowed by City Charter), in addition to including capital investment in the property by the Sailing Club and annual community events.
DISCUSSION
Background
The property located at 4980 Buckley Cove Way is under the City’s stewardship, granted by the State Lands Commission (Chapter 1700, Statutes of 1965) in furtherance of navigation, commerce, and fisheries. The land may be leased by the City so long as the use of the land continues to fall within the guidelines of water navigation, recreation, and/or commerce that supports such activities. The property is adjacent to the Buckley Cove Park and boat launch, south of Pacific Boats Services and Stephens Marine.
Established in 1933, the Stockton Sailing Club has approximately 262 slips for lease to the public, with additional ground storage capacity and the ability to house kayaks, canoes, and paddle boards.
The Marina is also capable of berthing vessels up to 52 feet. Well-established in the Stockton community, the Sailing Club hosts various types of educational, community events, such as youth and adult Learn to Sail programs, regattas, car and boat shows, marine clean up days, and others.
City of Stockton Page 1 of 2 Printed on 2/2/2023
powered by Legistar™
833
File #: 23-0009, Version: 1
Present Situation
The City received a request from the Sailing Club to extend the present lease (Attachment B - Original Lease C.88.83) by an additional five (5) years. The purpose of the extension was to allow financing for the repair and replacement of the docks throughout the marina. The current lease is in good standing, and the property has been maintained at an acceptable level by the Sailing Club, therefore staff support the additional 5-year extension with the following primary terms:
1. Term will be extended an additional five (5) years, ending at midnight, June 30, 2043 (current lease term is July 1, 1988, to June 30, 2038).
2. The removal and replacement of dock A or B. The replacement will be equal to or greater in size and completed by December 31, 2027.
3. Sailing Club will host not less than six (6) community interactive events per year. Outreach for such events will incorporate all zip codes within the City of Stockton. Sailing Club will pay a penalty, equal to one month’s rent, for each missed event.
FINANCIAL SUMMARY
There is no negative financial impact to the City’s General Fund or any other unrestricted fund because of this action. Monthly lease proceeds will continue to be deposited into Economic Development’s Boat Launch Fund, Marina Division, Property Rentals account as follows: 6050-000- 461000-100-140-10-60-000-000.
The Sailing Club paid rent to the City in the amount of $1,250 per month during the initial lease year, which increased annually by 3% starting in 1989. Currently the monthly lease rate is $3,415 for an annual payment of $40,980. The recommended amendment does not change the current terms of monthly payments or the annual lease escalation (valued at $76,232 in 2043); however, additional value is added through the amendment in requiring replacement of docks by the Sailing Club.
Attachment A - Vicinity Map
Attachment B - Original Lease C.88.83
City of Stockton Page 2 of 2 Printed on 2/2/2023
powered by Legistar™
834
Stockton
Sailing Club
ATTACHMENT A 835
ATTACHMENT A 836
ATTACHMENT B 837
ATTACHMENT B 838
ATTACHMENT B 839
ATTACHMENT B 840
ATTACHMENT B 841
ATTACHMENT B 842
ATTACHMENT B 843
ATTACHMENT B 844
ATTACHMENT B 845
ATTACHMENT B 846
ATTACHMENT B 847
ATTACHMENT B 848
ATTACHMENT B 849
ATTACHMENT B 850
ATTACHMENT B 851
ATTACHMENT B 852
ATTACHMENT B 853
ATTACHMENT B 854
ATTACHMENT B 855
ATTACHMENT B 856
ATTACHMENT B 857
ATTACHMENT B 858
Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A LEASE
AMENDMENT WITH THE STOCKTON SAILING CLUB
The property located at 4980 Buckley Cove Way is under the City’s stewardship, granted by the State Lands Commission (Chapter 1700, Statutes of 1965); and The current City lease for the property known locally as Stockton Sailing Club, will expire on June 30, 2038; and
Stockton Sailing Club desires to extend the present lease, by an additional five (5) years, ending at midnight, June 30, 2043; and
In addition to the extension, the Stockton Sailing Club will invest in the removal/replacement of a new dock, equal to or greater in size to a current dock, and will commit to host not less than six (6) community interactive events per year; now, therefore
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The City Manager, or designee, is hereby authorized to execute a Lease Amendment between the City of Stockton and the Stockton Sailing Club, attached as Exhibit 1 and incorporated by this reference.
2. The City Manager, or designee, is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED February 7, 2023 .
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
859
EXHIBIT 1 860
EXHIBIT 1 861
City of Stockton
Legislation Text
File #: 22-1170, Version: 1
ADOPT A RESOLUTION TO REVISE AND EXTEND THE NON-RESIDENTIAL PUBLIC
FACILITIES FEE AND MITIGATION FEE SHORT-TERM DEFERRAL PROGRAM
RECOMMENDATION
It is recommended that the City Council adopt a resolution to:
1. Approve revisions to, and the extension of, the Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program for new construction projects through December 31, 2027, effective immediately;
2. Authorize the City Manager, or designee, to execute Fee Deferral Agreements in accordance with the terms of the Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program guidelines; and
3. Authorize the City Manager, or designee, to take necessary and appropriate actions to carry out the purpose and intent of the resolution.
Summary
City Council adopted the current Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program (the “Program”) in 2017 (Attachment A -Resolution 2017-01-24-1210) with a fiveyear lifespan. The Program has incentivized the development of more than 1.86 million SF of industrial warehouse space in Stockton, creating hundreds of jobs. The City Council recognizes economic development and downtown/neighborhood revitalization as key goals for Stockton. Staff is recommending revisions to the guidelines and extension of the Program to support the continued development of new commercial and industrial spaces throughout the city.
DISCUSSION
Background
In 2017, the City Council approved a resolution to create the Program to incentivize economic development in underutilized and undeveloped land by reducing up-front costs for new nonresidential construction projects within the city. The Program’s goal is to encourage development, attract new businesses and create additional job opportunities for Stockton’s community.
The Program provides short-term relief from up-front development costs by allowing a developer with a qualified project to elect to defer payment of certain eligible Public Facilities Fees until the first certificate of occupancy, whether temporary or final, or two years from the first building permit issuance, whichever is less.
City of Stockton Page 1 of 3 Printed on 2/2/2023
powered by Legistar™
862
File #: 22-1170, Version: 1
To qualify for the Program, the project must be a new non-residential construction project with eligible impact fees exceeding $20,000. The following fees are eligible for short-term deferral under the Program guidelines:
Eligible Public Facilities Fees:
· City Office Space
· Delta Water Supply System
· Fire Station
· Library
· Police
· Street Improvements
· Water Utility Connection
· Wastewater Connection
· Community Recreation Center
Eligible Mitigation Fees:
· Agricultural Mitigation Fee
· Air Quality Mitigation Fee
The City does not have the authority to defer “pass-through” fees, such as the San Joaquin MultiSpecies Habitat Conservation and Open Space Plan Mitigation Fee, Regional Transportation Impact Fee, and San Joaquin County Facilities Fees.
New, non-residential construction projects identified as commercial or industrial developments may be eligible to apply. Applications for the program must be submitted to the Economic Development Department before issuing a building permit. A fee deferral agreement between the applicant and the City must be executed. A temporary or final certificate of occupancy can be issued by the City when all required fees, including those that were deferred, have been paid in full.
Present Situation
The current Program was adopted in 2017 with a five-year lifespan unless extended by City Council.
Since its adoption, the Program has helped incentivize development in Stockton’s industrial areas with the development of a 164,000 SF industrial warehouse near the airport and a 187,000 SF logistics facility, 388,000 SF logistics facility, and 1.1 million SF logistics facility near the Burlington Northern Santa Fe Railroad Internodal facility, bringing in companies and creating hundreds of job opportunities for Stockton’s community.
The City Council’s FY 2021-22 One Page Strategic Plan identified prioritizing economic development as one of its goals with action items including developing business incentives and leveraging the City’s logistics and multi-modal transport assets.
Additionally, due to the current economic climate, supply-chain issues, and inflation, obtaining building materials has been difficult for some developers delaying their buildout timelines.
City of Stockton Page 2 of 3 Printed on 2/2/2023
powered by Legistar™
863
File #: 22-1170, Version: 1
Presently, the Program defers fees for a period of up to two years. Staff recommends revising the Program guidelines to allow the City Manager discretion to defer fees for a period of greater than two years where special circumstances exist. Additionally, staff recommends a revision which allows the City Manager to enter into fee deferral agreements on behalf of the City in amounts greater than the City Manager’s expenditure authority, which is currently $100,000.
Staff also recommends extending the program through December 31, 2027, as residential development continues in north Stockton, requiring much-needed commercial development. This Program can encourage the improvement of undeveloped properties throughout the City and further supports the ongoing industrial development in south Stockton near the various intermodal transportation facilities.
FINANCIAL SUMMARY
There is no negative financial impact to the City’s General Fund or any other unrestricted fund associated with modifying and extending the Program. The Program merely defers payment of certain fees.
Attachment A - Resolution 2017-01-24-1210
City of Stockton Page 3 of 3 Printed on 2/2/2023
powered by Legistar™
864
ATTACHMENT A 865
ATTACHMENT A 866
Exhibit 1
City of Stockton
NON-RESIDENTIAL PUBLIC FACILITIES FEE AND MITIGATION FEE SHORT-TERM DEFERRAL
PROGRAM GUIDELINES
Goals and Objectives
The purpose of the Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program is to serve as an additional tool in the City’s economic development efforts to generate new revenue, attract new business, and create additional jobs throughout Stockton.
The program provides short-term relief from upfront development costs, specifically impact fees, until construction has been completed and the building is ready to occupy.
Program Guidelines
The Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program will be used to attract and support new non-residential construction projects throughout the City.
Rather than paying development impact fees at the time a building permit is issued, a developer with a qualified non-residential project may elect to defer payment of such fees, with the exception of Surface Water Supply Fee, SJMSCP (Habitat) Fee, Regional Transportation Impact Fee, and San Joaquin County Facilities Fees. The City of Stockton does not have the authority to defer “pass-through” impact fees, such as the County Facilities or Habitat program fees.
1. Definitions
A “new non-residential construction project” is defined as a new non-residential project on one parcel of land or a group of non-residential contiguous parcels under the same ownership.
A “qualified project” is defined as a new non-residential construction project with eligible Public Facilities and Mitigation fees exceeding $20,000.
2. Eligible Fees
The following development fees are eligible for short-term deferral for qualified new nonresidential construction projects:
Public Facilities Fees:
City Office Space
Delta Water Supply System
Fire Station
Library
Police
Street Improvements
Water Utility Connection
Wastewater Connection
Mitigation Fees:
Agricultural Mitigation Fee
Air Quality Mitigation Fee
ATTACHMENT A 867
Exhibit 1
3. Short-term Deferral of Fees
New non-residential construction projects may defer eligible fees until first certificate of occupancy, whether temporary or final, or two years from the first building permit issuance, whichever is less.
4. Application and Processing
A request for short-term deferral of eligible fees for new non-residential construction projects must be submitted in writing to the Economic Development Department for review prior to issuance of a building permit. If the project is deemed eligible, a fee deferral agreement must be executed between the applicant and City prior to the issuance of the building permit. The City Manager shall have the authority to execute such agreements on behalf of the City. A temporary or final certificate of occupancy will not be issued by the City until all required fees, including those that have been deferred, are paid in full.
This program will become effective sixty (60) days from the date of approval and will remain in effect for a period of five (5) years, unless extended by the Stockton City Council.
Adopted by the Stockton City Council
_________ - Resolution No. ________________
ATTACHMENT A 868
Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION AUTHORIZING THE REVISIONS AND EXTENSION OF THE
NON-RESIDENTIAL PUBLIC FACILITIES FEE AND MITIGATION FEE SHORT-TERM FEE DEFERRAL PROGRAM UNTIL 2027
In 1991, the City Council adopted the Public Facilities Fee Program Administrative Guidelines (Resolution No. 91-0119) and was subsequently amended; and
The City Council adopted Stockton Municipal Code section 16.72.260, creating, and establishing the authority for imposing and charging Public Facilities Fees on new development; and
In 2017, the City Council adopted the Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program to provide temporary financial relief for developers of new commercial or industrial development who may elect to defer payment of eligible Public Facilities Fees and Mitigation Fees; and The City Council continues to identify several key goals for the City, including economic development and downtown/neighborhood revitalization; and The City would like to revise guidelines and extend the Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program through December 31, 2027, to provide additional economic development incentives and help support new commercial and industrial development in the City, effective immediately; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The City hereby approves an extension of the Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program through December 31, 2027, unless extended or sooner terminated by the City Council. The City further approves of the revised Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program guidelines, effective immediately, and attached hereto as Exhibit 1.
//
//
//
//
869
2. The City Manager, or designee, is hereby authorized to execute Non-residential Fee Deferral agreements in accordance with the terms of the program guidelines and directed to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED February 7, 2023 .
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
870
EXHIBIT 1
City of Stockton
NON‐RESIDENTIAL PUBLIC FACILITIES FEE AND MITIGATION FEE SHORT‐TERM DEFERRAL
PROGRAM GUIDELINES
Goals and Objectives
The purpose of the Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program is to serve as an additional tool in the City’s economic development efforts to generate new revenue, attract new business, and create additional jobs throughout Stockton.
The program provides short-term relief from upfront development costs, specifically impact fees, until construction has been completed and the building is ready to occupy.
Program Guidelines
The Non-residential Public Facilities Fee and Mitigation Fee Short-term Deferral Program will be used to attract and support new non-residential construction projects throughout the City.
Rather than paying development impact fees at the time a building permit is issued, a developer with a qualified non-residential project may elect to defer payment of such fees, with the exception of Surface Water Supply Fee, SJMSCP (Habitat) Fee, Regional Transportation Impact Fee, and San Joaquin County Facilities Fees. The City of Stockton does not have the authority to defer “pass-through” impact fees, such as the County Facilities or Habitat program fees.
1. Definitions
A “new non-residential construction project” is defined as a new non-residential project on one parcel of land or a group of non-residential contiguous parcels under the same ownership.
A “qualified project” is defined as a new non-residential construction project with eligible Public Facilities and Mitigation fees exceeding $20,000.
2. Eligible Fees
The following development fees are eligible for short-term deferral for qualified new nonresidential construction projects:
Public Facilities Fees:
City Office Space
Delta Water Supply System
Fire Station
Library
Police
Street Improvements
Water Utility Connection
Wastewater Connection
Community Recreation Center
Mitigation Fees:
Agricultural Mitigation Fee
Air Quality Mitigation Fee
871
EXHIBIT 1
3. Short‐term Deferral of Fees
New non-residential construction projects may defer eligible fees until first certificate of occupancy, whether temporary or final, or two years from the first building permit issuance, whichever is less. The City Manager or designee shall have the authority to approve an extension of an executed agreement beyond the two-year term when requested by the developer under special circumstances. The developer shall present circumstances and an official request in writing to the City of Stockton Economic Development Department staff for review; staff will then make recommendation to the City Manager for final approval. If an extension is granted, an amendment to the existing agreement is required and City Manager or designee shall have the authority to execute amendments.
4. Application and Processing
A request for short-term deferral of eligible fees for new non-residential construction projects must be submitted in writing to the Economic Development Department for review prior to issuance of a building permit. If the project is deemed eligible, a fee deferral agreement must be executed between the applicant and City prior to the issuance of the building permit. The City Manager shall have the authority to execute such agreements on behalf of the City including where agreements exceed the dollar value of the City Manager’s expenditure authority. A temporary or final certificate of occupancy will not be issued by the City until all required fees, including those that have been deferred, are paid in full.
This program will become effective immediately from the date of approval and will remain in effect through December 31, 2017, unless extended by the Stockton City Council.
Adopted by the Stockton City Council
- Resolution No.
Revised February 7, 2023
872
City of Stockton
Legislation Text
File #: 22-1132, Version: 1
AUTHORIZE A RESOLUTION TO COVER VOLUNTEERS UNDER THE CITY’S SELF-INSURED
WORKERS COMPENSATION PROGRAM
RECOMMENDATION
It is recommended that the City Council adopt and authorize a resolution to cover City volunteers under the City’s self-insured workers’ compensation program in accordance with California Labor Code section 3363.5.
Summary
The City of Stockton utilizes volunteers in various departments to assist the City in various projects.
The City recognizes its responsibility to provide a safe work place but understands that injuries may occur. The City would like to formally elect to cover individuals who perform voluntary services without pay, under our workers’ compensation program, per Labor Code section 3363.5.
Background
The City of Stockton has been self-insured for workers’ compensation since January 1, 1979. Our workers’ compensation claims are administered by a third-party claims administrator. Our selfinsured retention is $500,000 per claim. To date, no injury claim submitted by a volunteer has exceeded our self-insured retention.
In 2022, the City recorded 708 volunteers primarily in Police, Recreation and Library. The City has reported 12 volunteer claims over a 5-year period with an average incurred cost of $10,812 per claim.
The City elected to cover these injuries under our self-insured workers’ compensation program as a cost-effective option rather than allowing the volunteer to pursue a liability claim for damages.
Present Situation
California Labor Code section 3363.5 allows public agencies to extend workers’ compensation coverage to persons who perform voluntary service without pay while those volunteers are performing such service. In order to reduce exposure, the City has provided workers’ compensation benefits to volunteers when injured. Staff recommends a formal resolution be adopted by Council to continue implementing these practices.
Findings
Based on loss history, covering volunteers under our workers’ compensation program is the most cost-effective approach to provide benefits to volunteers who are injured in the course of their voluntary service.
City of Stockton Page 1 of 2 Printed on 2/2/2023
powered by Legistar™
873
File #: 22-1132, Version: 1
FINANCIAL SUMMARY
We do not anticipate an increase in premium based on the loss ratio and incurred claims.
City of Stockton Page 2 of 2 Printed on 2/2/2023
powered by Legistar™
874
Resolution No.
STOCKTON CITY COUNCIL
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF STOCKTON, CALIFORNIA, PROVIDING WORKERS’ COMPENSATION COVERAGE FOR
CERTAIN CITY OF STOCKTON VOLUNTEERS PURSUANT TO THE PROVISIONS OF SECTION 3363.5 OF THE LABOR CODE
The City of Stockton utilizes volunteers in the provisions of certain government services; and
Said volunteers should be eligible for workers’ compensation coverage while on duty; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. Find and determine that the public interest is best served by providing workers’ compensation coverage for City of Stockton volunteer workers as specified by the City Manager.
2. Provide eligibility for said volunteers for workers’ compensation benefits which will be applicable during the time the person actually performs volunteer services, provided, however, that the rights of volunteers shall be limited as set forth in applicable California Labor Codes.
3. Where volunteers are employed by an entity contracting with the City, the workers’ compensation coverage of that entity will be primary. A valid contract addressing coverage in conflict with this provision will take precedence.
4. The City Manager is authorized to take such other actions as are appropriate to carry out the intent of this Resolution.
PASSED, APPROVED, and ADOPTED February 7, 2023
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
.
875
City of Stockton
Legislation Text
File #: 23-0011, Version: 1
AWARD PHASE 2 OF THE PROGRESSIVE DESIGN-BUILD CONTRACT FOR THE SOUTH STOCKTON SYSTEM GROUNDWATER WELL REHABILITATION AT WELL SSS8 PROJECT AND AMEND THE FISCAL YEAR 2022-23 ANNUAL BUDGET
RECOMMENDATION
It is recommended that the City Council adopt a resolution to:
1. Award Phase 2 of the Progressive Design-Build Contract for the Guaranteed Maximum Price (GMP), in the amount of $5,425,255, between the City and PCL Construction, Inc., of Tempe, AZ, for the final design, engineering services during construction, construction, and permitting of the South Stockton System Groundwater Well Rehabilitation at Well SSS8, Project No.
UH22008 (Exhibit 1 to the Resolution).
2. Authorize the City Manager to execute Amendment No.1 to the Progressive Design-Build Contract for Phase 2 work.
3. Approve the filing of Notice of Exemption No. NOE41-22 under the California Environmental Quality Act (CEQA) for the South Stockton System Groundwater Well Rehabilitation at Well SSS8, Project No. UH22008 (Exhibit 2 to the Resolution).
4. Transfer funds in the amount of $400,000 from the Water Utility Fund Balance to the South Stockton System Groundwater Well SSS8, Project No. UH22008.
It is also recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this resolution.
Summary
If approved by Council, this action will amend the Progressive Design-Build Contract with PCL Construction, Inc. for the final design, engineering services during construction, construction, and permitting of the wellhead treatment improvements to rehabilitate South Stockton System Groundwater Well Rehabilitation at Well SSS8 (Project No. UH22008) located next to Ernie Shropshire Park in South Stockton. Wellhead treatment and water treatment facility improvements are necessary for Well SSS8 to meet the State Water Resources Control Board (SWRCB) Drinking Water Standards and the requirements of California law.
The Progressive Design-Build Contract was anticipated to be executed in two phases. On March 22, 2022, by Resolution No. 2022-03-22-1212, Council authorized the City Manager to execute a City of Stockton Page 1 of 3 Printed on 2/2/2023
powered by Legistar™
876
File #: 23-0011, Version: 1
Progressive Design-Build Contract with PCL Construction, Inc., in the amount of $485,591, to perform Phase 1 design services for the South Stockton System Groundwater Well Rehabilitation at Well SSS8 Project.
If approved, this action will award Phase 2 of the Progressive Design-Build Contract, in the amount of $5,425,255, to PCL Construction, Inc. for the final design, engineering services during construction, construction, and permitting for the South Stockton System Groundwater Well Rehabilitation at Well SSS8 Project.
DISCUSSION
Background
As listed in the most recent MUD Water Utility Master Plan and Urban Water Management Plan, there are two drinking water supply sources for the South Stockton System (SSS), including potable water purchased from Stockton East Water District and groundwater wells. Currently, there are a total of five groundwater wells in the South Stockton System, and only two wells are in active status. The remaining groundwater wells were placed into the inactive status and require rehabilitation prior to being brought back into service.
Groundwater Well SSS8 is located next to Ernie Shropshire Park in South Stockton and will be the first water well from the South Stockton System to be rehabilitated. Wellhead treatment for the removal of water quality constituents is a standard industry practice and will be used to meet new SWRCB Drinking Water Standards and requirements of California law.
On March 22, 2022, by Resolution No. 2022-03-22-1212, Council authorized the City Manager to execute a Progressive Design-Build Contract with PCL Construction, Inc. in the amount of $485,591.
PCL Construction, Inc. subcontracted with Hazen and Sawyer to perform Phase 1 design services for the South Stockton System Groundwater Well Rehabilitation at Well SSS8 Project.
The Phase 1 engineering services performed by Hazen and Sawyer advanced the design to the 60 percent completion level. PCL Construction, Inc. provided cost estimates for equipment and subcontractors to develop a GMP for Phase 2 of the Project.
Present Situation
PCL Construction, Inc. and City staff agreed upon the GMP and schedule for Phase 2, which is now presented to City Council for approval.
Phase 2 of the Progressive Design-Build Contract includes the following scope of services:
1. Final Design,
2. Permitting,
3. Construction, and
4. Engineering Services During Construction.
City of Stockton Page 2 of 3 Printed on 2/2/2023
powered by Legistar™
877
File #: 23-0011, Version: 1
ENVIRONMENTAL CLEARANCE
It has been determined that this project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) guidelines as specified under Article 19, 15302(c) of the CEQA guidelines because it concerns the replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity.
In addition, the proposed project is consistent with the Government Code Section 65402 and the GPU (Land Use Policy 6.3) because it improves existing utility services to ensure that all neighborhoods have access to well-maintained public facilities that meet community service needs.
LOCAL EMPLOYMENT ORDINANCE
This project is subject to the Local Employment Ordinance, and all applicable requirements will be conditioned upon PCL Construction, Inc.
The contract amount is over $100,000 and subject to the Local Employment Ordinance, which requires that “all City contracts for public works or improvements of the estimated value or City subsidy of $100,000 or more shall contain provisions pursuant to which the contractor promises to make a good faith effort, with the assistance of local labor union hiring halls or community organizations designated by the City to employ qualified individuals who are, and have been for one year prior to the effective date of the contract, residents of Stockton in sufficient numbers so that no less than 50 percent of the contractor’s total construction workforce, including any subcontractor workforce, measured in labor work hours, is comprised of Stockton residents.”
COMMUNITY WORKFORCE AND TRAINING AGREEMENT
On July 26, 2016, Council adopted a Community Workforce and Training Agreement (CWTA). The CWTA became effective August 25, 2016, and applies to all Public Works projects over $1 million that are bid after the effective date. The South Stockton System Groundwater Well Rehabilitation at Well SSS8 Project is subject to the requirements of CWTA.
FINANCIAL SUMMARY
Funds will be transferred in the current fiscal year in the amount of $400,000 from the Water Utility Fund Balance to the Rehabilitation of South Stockton System Groundwater Well SSS8 Project UH22008.
There is no impact to the City’s General Fund or any other unrestricted fund because of taking the recommended action.
City of Stockton Page 3 of 3 Printed on 2/2/2023
powered by Legistar™
878
Resolution No.
STOCKTON CITY COUNCIL
================================================================ RESOLUTION AWARDING PHASE 2 OF THE PROGRESSIVE DESIGN-BUILD
CONTRACT FOR THE SOUTH STOCKTON SYSTEM GROUNDWATER WELL REHABILITATION AT WELL SSS8 AND AMEND THE FISCAL YEAR 2022-23
ANNUAL BUDGET
Phase 2 of the South Stockton System Groundwater Well Rehabilitation at Well SSS8 (“Project”) will provide for the final design, engineering services during construction, construction, and permitting of the wellhead treatment improvements and facility improvements; and
On March 22, 2022, by Resolution No. 2022-03-22-1212, City Council authorized the City Manager to execute a Progressive Design-Build Contract with PCL Construction, Inc., in the amount of $485,591 to perform Phase 1 design services for the Project. The Progressive Design-Build Contract was anticipated to be executed in two phases: Phase 1 for the design through 60% completion level and Phase 2 for final design, engineering services during construction, construction, and permitting; and PCL Construction, Inc. completed the scope of work for Phase 1 and developed a guaranteed maximum price (GMP) for the Phase 2 work of the Project; and The project conforms with the City’s General Plan, pursuant to California Government Code, section 65402, and is exempt from the requirements of the California Environmental Quality Act (CEQA) as specified under Article 19, section 15302(c) of the CEQA Guidelines. The project also conforms with the 2040 Stockton General Plan based on Policy Land Use – 6.3; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The City Council awards Phase 2 of the Progressive Design-Build Contract, in the amount $5,425,255 to PCL Construction, Inc. for the final design, engineering services during construction, construction, and permitting for the South Stockton System Groundwater Well Rehabilitation at Well SSS8 (UH22008).
2. The City Council authorizes the City Manager to execute Amendment No. 1 to Progressive Design-Build Contract, a copy of which is attached hereto as Exhibit 1 and incorporated herein by this reference.
3. The filing of the Notice of Exemption No. NOE41-22 under CEQA for the South Stockton System Groundwater Well Rehabilitation at Well SSS8 (UH22008) is approved, a copy of which is attached hereto as Exhibit 2 and incorporated herein by this reference.
879
4. The City Manager is hereby authorized to transfer funds in the amount of $400,000 from the Water Utility Fund Balance to the South Stockton System Groundwater Well Rehabilitation at Well SSS8 (UH22008).
5. The City Council authorizes the City Manager to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution including future amendments.
6. This Resolution shall take effect upon its adoption.
PASSED, APPROVED, and ADOPTED February 7, 2023 .
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
880
AMENDMENT NO. 1
TO
PROGRESSIVE DESIGN-BUILD CONTRACT
(PCL Construction, Inc.)
This Amendment No.1 to the Progressive Design-Build Contract (“Amendment No.1”) by and between the City of Stockton (“City”) and PCL Construction, Inc. (“Contractor”) is made and entered into on , 2023.
WHEREAS, the City and Contractor entered into a Progressive Design-Build Contract for the City’s South Stockton System Groundwater Well Rehabilitation at Well SSS8 (“the Project”) dated May 5, 2022 (“the Agreement”); and
WHEREAS, the Agreement is separated into Phase 1 (Design Services through 60-75% completion) and Phase 2 (completion of Design Services and Construction); and WHEREAS, Amendment No. 1 constitutes Phase 2 work (completion of Design Services and Construction); and
WHEREAS, the City and Contractor have agreed to the Scope of Work, Schedule, and GMP for Phase 2; and
WHEREAS, the City will exercise the Option in Section 00500 of the Agreement for the performance of the Phase 2 work with the Contractor; and WHEREAS, this amendment is for the mutual benefit of City and Contractor; NOW, THEREFORE, the City and Contractor agree as follows:
1. The Agreement, and specifically Section 00500 of the Agreement and the exhibits attached thereto, is amended in the manner set forth as attached hereto as Attachment A.
2. The Specification Sections and the Exhibits of the Agreement attached hereto are added EXHIBIT 1
881
in the manner set forth therein.
3. The Work for Phase 2 shall include the following:
• Final Design and Engineering Services During Construction (Attachment B) • Construction
• Permitting
4. The GMP for the Work for Phase 2 shall be in the amount of $5,425,255.
5. Contract Time for Substantial Completion of all Construction Work and Final Completion of all Work shall be three hundred sixty (360) and thirty (30) consecutive calendar days, respectively, from Notice to Proceed for Phase 2 pursuant to Section 00700 General Conditions.
6. The Bond for Faithful Performance and Bond for Labor and Material shall be in the amount of the GMP for the Work for Phase 2.
7. Except as stated herein, all other terms and conditions of the Agreement remain unchanged.
8. If any conflict exists between the terms and provisions of the Agreement and the terms and provisions of this Amendment, the terms and provisions of this Amendment shall govern.
9. All capitalized terms used in this Amendment but not expressly defined in this Amendment shall have the meanings ascribed to them in the Agreement.
10. This Amendment may be executed in counterparts, each of which shall be deemed an original, but all of which shall constitute one and the same document. Delivery of an executed signature page of this Amendment by electronic means shall be effective as delivery of a manually executed counterpart hereof.
EXHIBIT 1
882
EXHIBIT 1
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
Exhibit N
(Intentionally left blank. Does not apply to this project.) EXHIBIT 1 928
Exhibit O
(Intentionally left blank. Does not apply to this project.) EXHIBIT 1 929
Exhibit P
(Intentionally left blank. Does not apply to this project.) EXHIBIT 1 930
Exhibit Q
GUARANTEED MAXIMUM PRICE
City of Stockton Municipal Utilities Department
Progressive Design-Build Services
South Stockton Groundwater Well Rehabilitation at Well SSS8 Project Guaranteed Maximum Price (“GMP”). CITY shall pay for CONTRACTOR's performance under this Agreement the Cost of the Work provided, however, that the Cost of the Work shall not exceed the GMP of $5,425,255.00, as adjusted by Change Order in accordance with the Contract Documents. The Cost of the Work as defined below.
EXHIBIT 1 931
PCL Construction, Inc.
Equipment Material Subcontract
UOM Sheet
Name Description Quantity
Labor Total Cost
Hours Rate Total Hours Unit Total Unit Total Unit Total Unit Total Services/
Tools / Supplies
Unit Total
Stockton CA, USA
BE220039
Opportunity No 54.511.CIV.21.112312
Location
Project
BE Number
Owner File No
Nov 01, 2022
General Estimate Summary 1:17:08 PM
Civil Infrastructure - Long Beach
Stockton Groundwater Well Rehab at Well SSS8 (P
Summary Page 1 of 2
Subcontractor & Vendor Pricing
DIV 01 GENERAL REQUIREMENTS 100 % 4,273 107.09 457,641 2,076 235.03 23,503 265.24 26,524 1,420 142,005 204.83 20,483 6,701.56 670,156 DIV 02 EXISTING CONDITIONS 1 LS 913 93.79 85,649 482 --- 27,783 --- --- --- 22,741 --- 196,640 --- 332,813 DIV 03 CONCRETE 1 LS 358 100.41 35,989 519 --- 7,280 --- 9,597 --- 28,049 --- 39,480 --- 120,395 DIV 09 FINISHES 1 LS --- --- --- --- --- --- --- --- --- --- --- 89,005 --- 89,005 DIV 11 EQUIPMENT 1 LS 544 79.71 43,365 ---8 1,164 --- --- --- 1,047,738 --- 346,634 --- 1,438,901 DIV 15 MECHANICAL 1 LS 1,968 79.14 155,752 466 --- 20,188 --- --- --- 428,329 --- 23,873 --- 628,143 DIV 16 ELECTRICAL 1 LS --- --- --- --- --- --- --- --- --- --- --- 452,000 --- 452,000 Subcontractor & Vendor Pricing 8,057 --- 778,396 3,551 --- 79,918 --- 36,120 --- 1,668,862 --- 1,168,115 --- 3,731,412 Phase 2 Engineering 1 LS
Design Phase 2 Engineering Fee 1 LS --- --- --- --- --- --- --- --- --- --- --- 393,315 --- 393,315 Phase 2 Engineering 1 LS --- --- --- --- --- --- --- --- --- --- --- 393,315 --- 393,315 Insurance & Bond 1 LS
GE 9 F7 General Liabilty & Builders Risk 100 % --- --- --- --- --- --- 864.08 86,408 --- --- --- --- 864.08 86,408 GE 8 F6 Bond 100 % --- --- --- --- --- --- 813.83 81,383 --- --- --- --- 813.83 81,383 Insurance & Bond 1 LS --- --- --- --- --- --- --- 167,792 --- --- --- --- --- 167,792 0 15.04% T.DC. --- --- --- --- --- --- --- 167,792 --- --- --- 393,315 --- 561,107 Sub Total 8,057 --- 778,396 3,551 --- 79,918 --- 203,912 --- 1,668,862 --- 1,561,430 --- 4,292,518 Fee 10.00% T.C. 429,252
60% GMP Pricing 4,721,770
Allowances
Cost 01 PROJECT ALLOWANCE 1 LS --- --- --- --- --- --- --- --- --- 703,485 --- --- --- 703,485 Allowances 15.04% T.DC. --- --- --- --- --- --- --- --- --- 703,485 --- --- --- 703,485 STANDARD-LANDSCAPE-MASTER.RPT
C:\Users\praveenreddy\AppData\Local\BEST\LocalFiles\50b07a5d-d27a-4cad-a7a7-cefaf0c417e7\ Proprietary and Confidential U01
EXHIBIT 1 932
PCL Construction, Inc.
Equipment Material Subcontract
UOM Sheet
Name Description Quantity
Labor Total Cost
Hours Rate Total Hours Unit Total Unit Total Unit Total Unit Total Services/
Tools / Supplies
Unit Total
Stockton CA, USA
BE220039
Opportunity No 54.511.CIV.21.112312
Location
Project
BE Number
Owner File No
Nov 01, 2022
General Estimate Summary 1:17:08 PM
Civil Infrastructure - Long Beach
Stockton Groundwater Well Rehab at Well SSS8 (P
Summary Page 2 of 2
TOTAL 60% GMP 5,425,255
STANDARD-LANDSCAPE-MASTER.RPT
C:\Users\praveenreddy\AppData\Local\BEST\LocalFiles\50b07a5d-d27a-4cad-a7a7-cefaf0c417e7\ Proprietary and Confidential U01
EXHIBIT 1 933
Attachment A to Amendment No. 1
Specification Sections
EXHIBIT 1 934
SECTION 00010 - TABLE OF CONTENTS
DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS
Section
00010 Table of Contents
00100 Instructions to Contractor
1.0 Inspection of Site
2.0 Wage Rates
3.0 Offer of Assignment of Antitrust Actions
4.0 Assignment of Contract
5.0 Contract and Bonds
6.0 Execution of Contract
7.0 Business License
8.0 Construction and Demolition Debris
9.0 Local Employment
10.0 Community Workforce and Training Agreement
00220 Geotechnical Data
GENERAL REQUIREMENTS
00500 Construction Contract
00700 General Conditions
1.0 GENERAL
1.1 Intent of Contract Documents
1.2 Discrepancies and Omissions
1.3 Headings
1.4 Penalty for Collusion
1.5 Successors and Assigns
1.6 Assignment to City
1.7 Rights and Remedies
1.8 Ownership and Use of Contract Documents
2.0 ADMINISTRATION
2.1 Administration of the Contract
2.2 City's Representative
2.3 Construction Management
2.4 Not Used
EXHIBIT 1 935
3.0 CITY
3.1 General
3.2 Attention to Work
3.3 Inspection
3.4 City's Right to Carry Out the Work
3.5 City's Right to Use or Occupy
3.6 City's Right to Perform Work and to Award Separate Contracts
4.0 CONTRACTOR
4.1 Office
4.2 Contractor's Representative
4.3 Construction Procedures
4.4 Contractor's Employees
4.5 Subcontractors
4.6 Contractor's Equipment and Facilities
4.7 Public Safety and Convenience
4.8 City-Contractor Coordination
4.9 Permits
4.10 Contractor's Responsibility for the Work and Materials
4.11 Laws to be Observed
4.12 Safety
4.13 Review of Contract Documents and Field Conditions by Contractor; Single Point Responsibility of Contractor
4.14 Design, Supervision and Construction Procedures
4.15 Labor and Materials
4.16 Construction Documents
5.0 CONTROL OF WORK AND MATERIALS
5.1 Means and Methods
5.2 City Furnished Materials
5.3 Defective and Unauthorized Work
5.4 Unnoticed Defects
5.5 Right to Retain Imperfect Work
6.0 PROGRESS OF THE WORK
6.1 Beginning of Work
6.2 Time of Completion
6.3 Delays
6.4 Time Extensions
6.5 Liquidated Damages
6.6 Reserved
6.7 Termination By City for Cause
6.8 Suspension By City for Convenience
6.9 Termination By City for Convenience
6.10 Temporary Suspension of Work
7.0 SCOPE OF WORK - CHANGES IN THE WORK
7.1 Changes
7.2 Change Orders
7.3 Differing Site Conditions
7.4 Changes to Construction Documents
7.5 Contract Interpretation
7.6 Claims
EXHIBIT 1 936
7.7 Dispute Resolution
8.0 PAYMENT
8.1 Scope of Payment
8.2 Partial Payments
8.3 Partial Payments - Inclusion of Materials on Hand
8.4 Right to Withhold Amounts
8.5 Reserved
8.6 Substantial Completion
8.7 Acceptance
8.8 Facilities Startup and Testing
8.9 Final Completing and Final Payment
8.10 Warranty of Title
9.0 EXISTING UTILITIES
9.1 General
9.2 Notification and Location
9.3 Damage and Protection
9.4 Utility Relocation and Rearrangement
10.0 NOT USED
11.0 APPLICABLE LAW/CODE REQUIREMENTS
12.0 USE OF SITE AND CLEAN UP
13.0 UNCOVERING AND CORRECTION OF CONSTRUCTION
14.0 GUARANTEE
15.0 CORRECTION OF DEFECTIVE WORK AND GUARANTEE TO REPAIR PERIOD
16.0 CORRECTION OF PATENT DEFECTS OR LATENT DEFECTS AFTER
EXPIRATION OF GUARANTEE PERIOD
00800 Supplementary Conditions
1.0 LOCAL EMPLOYMENT
1.1 Good Faith Effort
1.2 Required Documentation
1.3 Forms Submitted Under Penalty of Perjury
1.4 Irresponsible Bidder Declaration
1.5 Binding on Subcontractors
1.6 Definitions
1.7 Contracts – Subcontracts
1.8 Exceptions
2.0 COMMUNITY WORKFORCE AND TRAINING AGREEMENT
3.0 Labor, Working Hours
EXHIBIT 1 937
4.0 Services, Materials, and Equipment
00820 Liability and Insurance Requirements
1.0 INSURANCE REQUIREMENTS
2.0 INDEMNIFICATION
DIVISION 1 - GENERAL REQUIREMENTS
01010 Summary of Work
1.0 WORK COVERED BY CONTRACT DOCUMENTS
2.0 CONTRACT ADMINISTRATION
2.1 Name of Construction Manager
2.2 Reserved
2.3 Name of City's Representative
3.0 TIME ALLOWED FOR COMPLETION
4.0 DAMAGES FOR DELAYS
5.0 WEATHER DAYS
6.0 WORK SEQUENCE AND CONSTRAINTS
7.0 OCCUPANCY REQUIREMENTS
8.0 RESERVED
9.0 TRENCH EXCAVATION
10.0 WORK UNDER OTHER CONTRACTS
11.0 CONTRACTOR'S WORK PERCENTAGE
12.0 UNDERGROUND FACILITIES
13.0 LEGAL AND CITY HOLIDAYS
01015 General Provisions
1.0 GENERAL
1.1 Description
1.2 Guarantee
1.3 Skilled and Trained Workforce Reporting
1.4 Permits and Licenses
1.5 Patents
EXHIBIT 1 938
2.0 PRODUCTS (Not applicable in this Section)
3.0 EXECUTION
3.1 Public Complaints
3.2 Reserved
3.3 Precedence of Contract Documents
3.4 Care and Protection of Property
3.5 Field Check of Existing Improvements
3.6 Protection of Existing Improvements
3.7 Cooperation With Others
3.8 Unfavorable or Hazardous Construction Conditions
01025 Measurement and Payment
1.0 MEASUREMENT OF QUANTITIES
1.1 General
1.2 Units of Measurement
1.3 Certified Weights
1.4 Methods of Measurement
2.0 RESERVED
3.0 PAYMENT
01035 Modification Procedures
1.0 GENERAL
2.0 CONTRACT MODIFICATION PROCEDURES
3.0 COST DETERMINATION
4.0 COST PRICING DATA AND ACCESS TO RECORDS
5.0 TIME EXTENSIONS FOR CHANGE ORDERS
01040 Coordination
1.0 GENERAL
2.0 COOPERATION WITH OTHERS
3.0 ORGANIZATION AND COORDINATION
3.1 Monthly Reports
3.2 Daily Reports
3.3 Correspondence
4.0 SYSTEM OUTAGE REQUESTS
5.0 SEQUENCING OF THE WORK
6.0 ACCESS TO PROJECT FACILITIES
01050 Field Engineering
EXHIBIT 1 939
1.0 CHECK OF EXISTING IMPROVEMENTS
2.0 DATUM
3.0 LINES AND GRADES
01060 Regulatory Requirements
1.0 APPLICABLE CODES
1.1 Laws and Regulations
1.2 Codes
1.3 Specifications
2.0 LICENSES, FEES, AND PERMITS
2.1 Contractor’s License
2.2 Business License
3.0 EARTHQUAKE DESIGN AND RESTRAINT
01090 References
1.0 DEFINITIONS
2.0 ABBREVIATIONS
01200 Project Meetings
1.0 PRE-CONSTRUCTION CONFERENCE
1.1 Attendees
1.2 Agenda
1.3 Minutes
2.0 PROGRESS MEETINGS
2.1 Schedule
2.2 Attendees
2.3 Agenda
2.4 Minutes
3.0 CONFERENCES
4.0 POST CONSTRUCTION MEETING
01210 Allowances
1.1 General
1.2 Cash Allowances
01300 Submittals
1.0 GENERAL SUBMITTALS REQUIREMENTS
2.0 SUBMISSION AND REVIEW
EXHIBIT 1 940
3.0 SCHEDULE OF VALUES
4.0 PROGRESS SCHEDULE
5.0 SHOP DRAWINGS
6.0 SAMPLES
7.0 MATERIALS LISTS AND EQUIPMENT DATA
8.0 VENDOR O&M MANUALS
9.0 INSTALLATION INSTRUCTIONS
10.0 CITY PERSONNEL TRAINING PLAN
11.0 OTHER SUBMITTALS
12.0 STORAGE INSTRUCTIONS
13.0 TOOLS, ACCESSORIES, SPARE PARTS, AND MAINTENANCE MATERIALS
14.0 RECORD DRAWINGS
15.0 PROCESS CONTROL NARRATIVES
16.0 CERTIFICATES
17.0 EARTHQUAKE DESIGN AND RESTRAINT
18.0 CONSTRUCTION PHOTOGRAPHS
19.0 REVISION OF SUBMITTALS
01310 Progress Schedule
1.0 CONSTRUCTION SCHEDULE
1.1 General
1.2 Form of Schedules
1.3 Review of System
1.4 Updates
1.5 Submittals
2.0 WEATHER CONDITIONS
3.0 RESERVED
4.0 TIME IMPACT ANALYSES
4.1 Requirement
4.2 Delays
4.3 Submittal
5.0 WEEKLY ACTIVITIES PLAN
EXHIBIT 1 941
6.0 RESERVED
7.0 RESERVED
01400 Quality Control
1.0 QUALITY CONTROL
2.0 INSPECTION
3.0 SAMPLES AND TESTS
3.1 Sampling
3.2 Testing
3.3 Test Standards
01500 Construction Facilities and Temporary Controls
1.0 GENERAL
2.0 TEMPORARY UTILITIES
2.1 Electrical Service
2.2 Water
2.3 Temporary Lightning
2.4 Heating and Ventilation
2.5 Sanitary Conveniences
3.0 CONSTRUCTION FACILITIES
3.1 Staging and False Work
3.2 Temporary Enclosures
3.3 Warning Devices and Barricades
3.4 Above Grade Protection
3.5 Use of Explosives
4.0 PROTECTION AND RESTORATION OF PROPERTY
5.0 PROJECT SECURITY
5.1 Fire Extinguisher
5.2 First Aid
5.3 Temporary Fences
6.0 ACCESS ROADS
7.0 SPECIAL CONTROLS
7.1 Dust Control
7.2 Mud Control
7.3 Noise Abatement
7.4 Working Hours
7.5 Drainage Control
7.6 Construction Cleaning
7.7 Disposal of Material
7.8 Parking and Storage Areas
8.0 TRAFFIC REGULATION
EXHIBIT 1 942
8.1 General
8.2 Haul Routes
8.3 Traffic Control
9.0 PROJECT OFFICE
9.1 Accessibility of Records
10.0 CONTRACTOR’S SAFETY RULES
01600 Material and Equipment
1.0 STORAGE OF MATERIALS
2.0 HAZARDOUS MATERIALS
01660 System Testing
01670 Training
1.0 GENERAL
2.0 INSTRUCTORS
3.0 SCHEDULING
4.0 INSTRUCTION PROGRAM
5.0 LOCATION
6.0 RECORD OF TRAINING SESSIONS
01700 Contract Closeout
1.0 MANUALS
2.0 EQUIPMENT START-UP
3.0 FINAL CLEANING
3.1 Final Clean-up
3.2 Final Building Clean-up
4.0 PROJECT COMPLETION
4.1 Substantial Completion
4.2 Final Completion
4.3 Project Record Documents
4.4 Punchlist
5.0 GUARANTEE
EXHIBIT 1 943
SECTION 00100 - INSTRUCTIONS TO CONTRACTOR
1.0 INSPECTION OF SITE
Contractor is required to inspect the site of the work to satisfy themselves by personal examination or by such other means as they may prefer, of the location of the proposed work, and of the actual conditions, including subsurface, of and at the site of work.
Submission of Contractor’s Phase 2 GMP shall constitute conclusive evidence that, if awarded the Phase 2 Contract Amendment, it has relied and is relying on its own examination of:
a. The site of the work.
b. Access to the site.
c. All other data and matters requisite to the fulfillment of the work and on its own knowledge of existing facilities on and in the vicinity of the site of the work to be constructed under the Contract.
d. The conditions to be encountered.
e. The character, quality and scope of the proposed work. f. The quality and quantity of the materials to be furnished. g. The requirements of the proposal, the plans, the specifications, and the other Contract Documents.
The information provided by the City is not intended to be a substitute for, or a supplement to the independent verification by the Contractor to the extent such independent investigation of site conditions is deemed necessary or desirable by the Contractor. However, it is specifically understood that Contractor is entitled to rely on the accuracy of any City-furnished information used to develop the design or otherwise provided to the Contractor during Phase 1 and Phase 2 of the Project.
2.0 WAGE RATES
Pursuant to provisions of the Labor Code Section 1770, et. seq., of the State of California, the Director of the Department of Industrial Relations has ascertained the prevailing rate of per diem wages of the locality in which the Work is to be performed and applicable to the work to be done. Copies of these wage determinations are on file with the City.
Contractor shall promptly notify the City, in writing, about all the classifications of labor not listed in the prevailing wage determinations but necessary for the performance of the Work.
Contractor and all subcontractors shall also comply with, and ensure that wage rates are in conformance with, the requirements of Specification Sections 00700, section 4.11, and EXHIBIT 1 944
Laws to be Observed. To the extent there is any conflict or inconsistency among or between the Contract Documents or any laws regarding labor or wage requirements, the Contract Document or law imposing the greater or more strict requirement on Contractor and/or any subcontractor shall control.
3.0 OFFER OF ASSIGNMENT OF ANTITRUST ACTIONS
As provided by Section 4552, et. seq., of the California Government Code, in submitting a Phase 2 GMP to the City, the Contractor offers and agrees that if the Phase 2 GMP is accepted and the Phase 1 Contract Amendment is executed, it will assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, materials, or services by the Contractor for sale to the City pursuant to the Phase 1 Contract Amendment.
4.0 ASSIGNMENT OF CONTRACT
The Contractor shall not assign any part of this Contract unless it complies with Section 00700-1.5, Successors and Assigns.
5.0 CONTRACT AND BONDS
Contractor will be required to furnish, in duplicate counterpart, a Labor and Material Bond on forms provided by the City, in an amount equal to one hundred percent (100%) of the total Phase 2 GMP (which includes Phase 2), a Faithful Performance Bond in an amount equal to one hundred (100%) of the Phase 2 GMP, and evidences of insurance in accordance with Section 00820. Said insurance and bonds shall be secured from a surety company satisfactory to the City.
The form of Contract, and the forms of bonds, as provided in Section 00500, which Contractor will be required to execute and furnish shall be carefully examined by the Contractor. The Faithful Performance Bond is to secure the faithful performance of the Contract, and the Labor and Material Bond is to secure the payment of those to whom the Contractor may become legally indebted for labor, materials, tools, equipment, or services of any kind used or employed by the Contractor in performing the work.
The bonds required of the Contractor shall be furnished by a company authorized to do a surety business in the State of California: said bonds shall be executed by the surety and Contractor before or concurrently with the signing of the Contract. The form of said bonds must be approved by the City Attorney and the surety must be approved by the City’s Director of Administrative Services / Chief Finance Officer.
All alterations, extensions of time, extra or additional work and other changes authorized by these specifications, or any part of the Contract may be made without securing the consent of the surety on the Contract bonds.
6.0 EXECUTION OF CONTRACT
EXHIBIT 1 945
The Contract shall be executed by the Contractor and returned within ten (10) days after receiving the Contract. Time is of the essence in this regard. After execution by City, one copy of the Contract shall be returned to Contractor. As provided in Section 00500, the performance and payment bonds would be required before the City executes an amendment to the Contract for Phase 2.
7.0 BUSINESS LICENSE
The Contractor must obtain and maintain a valid City of Stockton business license throughout the fiscal periods embraced by the duration of the Contract.
8.0 CONSTRUCTION AND DEMOLITION DEBRIS
In order to comply with the California Integrated Waste Management Act of 1989, Assembly Bill 939, the City of Stockton requires that construction and demolition projects recycle a minimum of fifty percent (50%) of all discarded materials generated by the projects to divert project waste from the landfills. a. CONSTRUCTION AND DEMOLITION RECYCLING PLAN
This plan is meant to assist contractors with identifying the types and quantities of materials that will be generated as a result of the project in order to find diversion outlets for these materials.
Once the Contract has been awarded, the contractor is required to complete and submit a Construction/Demolition (C&D) Recycling Plan prior to receiving a Notice to Proceed. The plan should be submitted to the Project Manager at the pre-construction meeting. The City may also request additional information, as necessary.
b. CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING REPORT
The contractor must complete the Construction and Demolition (C&D) Debris Recycling Report within thirty (30) days of construction or demolition project completion (Notice of Completion). The completed must be accompanied by the official weight tags or receipts verifying the information provided in the report and must be submitted to the City of Stockton Public Works Department, Solid Waste Division, Stewart Eberhardt Building, 22 E. Weber Ave., Room 301, Stockton, CA 95202. Failure to provide the C&D Recycling Report form will result in a five percent (5%) withholding of the contract amount. (Recycling forms are available at http://www.stocktongov.com/files/C&D%20Package.pdf)
9.0 LOCAL EMPLOYMENT
For contracts valued at $100,000 and above, pursuant to Stockton Municipal Code Section 3.68.095 the contractor and all subcontractors shall make a good faith effort to employ at least 50% of the workforce on this project from local residents, as measured by total labor work hours. Failure of any contractor or subcontractor to comply with these requirements shall be deemed a material breach of the contract or subcontract.
Contractors and subcontractors shall maintain records necessary for monitoring their compliance with Section 3.68.095 (see Section 00800).
EXHIBIT 1 946
10.0 COMMUNITY WORKFORCE AND TRAINING AGREEMENT
For contracts valued at $1,000,000 and above, pursuant to the implementation of the Community Workforce and Training Agreement (CWTA) adopted by the City Council on July 26, 2016, the successful bidder shall be required to comply with the provisions of the CWTA (see Section 00800).
*** END OF SECTION ***
EXHIBIT 1 947
SECTION 00220 - GEOTECHNICAL DATA
Contractor should visit the site and acquaint themselves with all existing conditions. Prior to submitting a final Phase 2 GMP, Contractor may make their own subsurface investigations to satisfy themselves as to site and subsurface conditions but such subsurface investigations shall be performed only under time schedules and arrangements approved in advance by the City. *** END OF SECTION ***
EXHIBIT 1 948
SECTION 00500 – PROGRESSIVE DESIGN-BUILD CONTRACT
Intentionally left blank. Refer to the Rehabilitation of South Stockton System Groundwater Well SSS8, Phase 1 Contract, adopted by Council Resolution No. 2022-03-22-1212 on March 22, 2022.
EXHIBIT 1 949
SECTION 00700 - GENERAL CONDITIONS
1.0 GENERAL
1.1 Intent of Contract Documents
The intent of the Contract Documents is to include all necessary criteria to establish the scope and quality for completion of the Work by Contractor. The Contract Documents are complementary and what is required by one shall be as binding as if required by all.
Performance by the Contractor shall be required to the extent consistent with, and reasonably inferable from, the Contract Documents.
1.2 Discrepancies and Omissions
In the case of conflict between terms of the Contract Documents, the following order of precedence shall apply:
(a) The Contract and Exhibits, including change orders and permits; (b) The Front End Contract Documents, General Conditions and their Exhibits; (c) The drawings;
(d) The technical specifications;
(e) The Contractor’s Proposal;
(f) The Request for Proposal dated September 25, 2021;
(g) City of Stockton Standard Specifications, as incorporated into the specifications; (h) Where no order of precedence is stated, or if conflict or inconsistency cannot be resolved by a careful review of the Contract Documents, the more stringent of the requirements shown or specified shall be controlling.
Organization of the Specifications into various subdivisions and the arrangement of the Drawings shall not control Contractor in dividing the Work among subcontractors, in trades, or into design packages, or in establishing the extent of work to be performed by any trade.
Unless otherwise stated in the Contract Documents, technical words and abbreviations contained in the Contract Documents are used in accordance with commonly understood design professional and construction industry meanings; and non-technical words and abbreviations are used in accordance with their commonly understood meanings.
The Contract Documents may omit modifying words such as “all” and “any,” and articles such as “the” and “an,” but the fact that a modifier or an article is absent from one statement and appears in another is not intended to affect the interpretation of either statement. The use of the word “including,” when following any general statement, shall not be construed to limit such statement to specific items or matters set forth immediately following such word or to similar items or matters, whether or not non-limiting language (such as “without limitation,” “but not limited to,” or words of similar import) is used with reference thereto, but rather shall be deemed to refer to all other items or matters that could reasonably fall within the broadest possible scope of such general statement.
EXHIBIT 1 950
Whenever the context so requires, the use of the singular number shall be deemed to include the plural and vice versa. Each gender shall be deemed to include any other gender, and each shall include corporation, partnership, trust, or other legal entity, whenever the context so requires. The captions and headings of the various subdivisions of the Contract Documents are intended only for reference and convenience and in no way define, limit, or prescribe the scope or intent of the Contract Documents or any subdivision thereof.
1.3 Headings
Headings to parts, divisions, sections, articles, paragraphs, subparagraphs, and forms are inserted for convenience of reference only and shall not affect the interpretation of the Contract Documents.
1.4 Penalty for Collusion
If, at any time, it is found that the person, firm, or corporation to whom the Contract has been awarded has, in presenting any bid or bids, colluded with any other party or parties, then the Contract shall be null and void, and the Contractor and its sureties shall be liable for loss or damage which the City may suffer thereby, and the City may not exercise the Option as defined in Section 00500.
1.5 Successors and Assigns
The City and the Contractor, respectively, bind themselves, their partners, successors, assigns, and legal representatives to the other party hereto and to the partners, successors, assigns, and legal representatives of such other party with respect to all covenants, agreements, and obligation contained in the Contract Documents. Neither party to the Contract shall assign the Contract or sublet it as a whole without the written consent of the other and consent of Surety.
1.6 Assignment to City
Pursuant to Public Contract Code 7103.5, in entering into the Contract and all subcontracts, to supply goods, services, or materials pursuant to the Contract, the Contractor and its subcontractors offer and agree to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the Contract and subcontracts. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgment by the parties.
1.7 Rights and Remedies
The duties and obligations imposed by the Contract Documents and the rights and remedies available thereunder shall be in addition to, and not a limitation of, any duties, obligations, rights, and remedies otherwise imposed or available by law.
No action or failure to act by the City, or the City’s Representative shall constitute a waiver of any right or duty afforded any of them under the Contract, nor shall any such action or EXHIBIT 1 951
failure to act constitute an approval of or acquiescence in any breach thereunder, except as may be specifically agreed in writing.
1.8 Ownership and Use Of Contract Documents
The Contract Documents, and all copies thereof, furnished to, or provided by, Contractor are the property of the City. The City and Contractor explicitly agree that all materials and documents developed in the performance of this Contract are the property of the City. The City shall have the right to use all drawings, designs, specifications, notes and any other documentation and other work developed in the performance of this Contract for the Project, or in connection with the Project, including without limitation future additions, alterations, connections, repairs, information, reference, use or occupancy and the right to re-use details of the design on any other City work, all without the Contractor’s consent and at no additional cost to the City. Any reuse, adaptation, modification, or changes to the Contract Documents prepared by Contractor without involvement by Contractor, or written verification or adaptation by Contractor and Contractor's Subconsultants, as appropriate, for the specific purpose intended will be at City's sole risk and without liability or legal exposure to Contractor, or to Contractor's Subcontractors, and City shall indemnify and hold harmless Contractor and Contractor's Subconsultants from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle Contractor to further compensation at rates to be agreed upon by City and Contractor.
2.0 ADMINISTRATION
2.1 Administration of the Contract
The City may retain the services of a consultant(s) to assist with contract administration.
This (these) consultant(s) will act as the City’s Representative in matters pertaining to the Contract.
The City Representative may consist of a team of individuals of which one will be assigned to manage the team.
In case of the termination of the City’s Representative(s), the City shall appoint a City Representative(s) whose status under the Contract Documents shall be that of the former City Representative(s), respectively.
2.2 City's Representative
2.2.1 General - The City's Representative has the authority to act on behalf of the City to implement change orders, progress payments, contract performance decisions, acceptability of the Contractor's work, and early possession.
2.2.2 Change Orders - The City's Representative has the authority to review and recommend or reject change orders and cost proposals submitted by the Contractor or as recommended by the Construction Manager.
2.2.3 Progress Payments - The City's Representative has the authority to accept or reject requests for progress payments which have been submitted by the Contractor and recommended by the Construction Manager.
EXHIBIT 1 952
2.2.4 Contract Performance Decisions - Should the Contractor disagree with the Construction Manager's decision with respect to the contract performance, the Contractor may appeal to the City's Representative in accordance with the provisions herein.
2.2.5 Acceptability of Work - The City's Representative has the authority to make the final determination of the acceptability of the Work. The City's Representative also has the authority to accept or reject the Design Consultant's recommendations regarding retention of defective work as provided.
2.3 Construction Management
2.3.1 General - The Construction Manager is a representative of the City employed to act as advisor and consultant to the City in construction matters related to the Contract.
All instructions to the Contractor and all communications from the Contractor to the City or the Design Consultant shall be forwarded through the Construction Manager. The Construction Manager will have authority to act on behalf of the City only to the extent provided in the Contract Documents. The City has delegated its authority to the Construction Manager to make initial decisions regarding questions which may arise as to the quality or acceptability of materials furnished and work performed, and as to the manner of performance and rate of progress of the work under the Contract. The Construction Manager shall interpret the intent and meaning of the Contract and shall make initial decisions with respect to the Contractor's fulfillment of the Contract and the Contractor's entitlement to compensation. The Contractor shall look initially to the Construction Manager in matters relating to the Contract.
The Construction Manager's authority to act under Paragraph 00700-2.1, Administration of the Contract, and any decision made by it in good faith either to exercise or not to exercise such authority shall not give rise to any duty or responsibility of the City or Construction Manager to the Contractor, any subcontractor, any of their agents or employees, or any other person performing any of the Work.
2.3.2 Representative - The Construction Manager will be represented at the Site by a resident construction manager or resident engineer who will observe the progress, quality, and quantity of the Work to determine, in general, if the Work is proceeding in accordance with the intent of the Contract Documents. The Construction Manager shall not be responsible for construction means, methods, techniques, sequences, or procedures, or for safety precautions and programs in connection with the Work.
In accordance with the provisions detailed elsewhere in these General Conditions, the Construction Manager will make decisions relative to all matters of interpretation or execution of the Contract Documents.
2.3.3 Inspection of Construction - The Construction Manager shall have the authority to reject work and materials which do not conform to the Contract Documents, and to require special inspection or testing in accordance with Paragraph 00700-5.3, Defective and Unauthorized Work.
In addition to the resident construction manager or resident engineer, the Construction Manager may employ one or more inspectors to observe the Work and to act in matters of EXHIBIT 1 953
construction under this Contract. An inspector is not authorized to revoke, alter, or waive any requirements of the Specifications. The inspector is authorized to call the attention of the Contractor to any failure of the Work, materials or workmanship to conform to the Contract Documents. The inspector shall have the authority to reject materials or, in any emergency, suspend the Work. The Contractor may appeal any such issue which it disagrees with to the Construction Manager for decision.
2.3.4 Acceptability of the Work - The Construction Manager has the authority to make a recommendation as to the acceptability of the Work.
2.3.5 Change Orders - The Construction Manager has the authority to initiate change orders; to reject change orders proposed by the Contractor or Design Consultant; to negotiate and recommend acceptance of change orders; or to order minor changes in the Work at no cost to the City.
2.3.6 Construction Schedule - The Construction Manager has the authority to review and recommend acceptance of the progress schedule submitted by the Contractor at the start of the Work and subsequent significant revisions for conformance to the specified sequence of work and logic.
2.3.7 Progress Payments - The Construction Manager has the authority to recommend acceptance or rejection of requests for progress payments which have been submitted by the Contractor.
2.3.8 Final Payment - The Construction Manager, with the assistance of the Design Consultant will conduct inspections to determine the dates of substantial completion of the Work and final completion of the Work, and will receive and forward to the City, for the City's review, written warranties, and related documents required by the Contract and assembled by the Contractor.
2.3.9 Early Possession - The Construction Manager has the authority to recommend early possession.
2.4 Not Used
3.0 CITY
3.1 General
The City, acting through the City's Representative or the Construction Manager, shall have the authority to act as the sole judge of the Work and materials with respect to both quantity and quality as set forth in the Contract.
3.2 Attention to Work
The City shall notify the Contractor in writing of the name of the individual designated as the City's Representative and the name of the individual designated by the Construction Manager to act as resident construction manager or resident engineer. The Construction Manager's designated representative normally will be at the Site of the Work. During the representative's absences, the Contractor may contact a previously designated representative of the Construction Manager.
EXHIBIT 1 954
3.3 Inspection
In addition to the resident construction manager or resident manager or resident engineer, the City may employ one or more inspectors to observe the Work and to act in matters of construction under this Contract. An inspector is not authorized to revoke, alter, or waive any requirements of the specifications. The inspector is authorized to call the attention of the Contractor to any failure of the Work or materials to conform to the Contract Documents.
The inspector shall have the authority to reject material or, in any emergency, suspend the Work. The Contractor may appeal any such issue with which it disagrees to the Construction Manager for decision by the Construction Manager.
Separate and independent from the inspection above, the project may be inspected by Building Officials for code compliance. Such inspectors shall have the authority provided to them by local jurisdiction.
Construction Manager will have authority to disapprove or reject Work which Construction Manager believes to be defective, or that Construction Manager believes will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. Construction Manager will also have authority to require special inspection or testing of the Work as provided in this Section, whether or not the Work is fabricated, installed, or completed.
Contractor shall give Construction Manager timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests.
If Laws or Regulations of any public body having jurisdiction require any Work (or part thereof) specifically to be inspected, tested, or approved by an employee or other representative of such public body, Contractor shall assume full responsibility for arranging and obtaining such inspections, tests, or approvals, pay all costs in connection therewith, and furnish Construction Manager the required certificates of inspection or approval.
Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, or approvals required for City’s and Construction Manager‘s acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, or approvals shall be performed by organizations acceptable to the City and Construction Manager.
If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of Construction Manager, it must, if requested by Construction Manager, be uncovered for observation.
Uncovering Work shall be at Contractor's expense unless Contractor has given Construction Manager timely notice of Contractor's intention to cover the same and Construction Manager has not acted with reasonable promptness in response to such notice.
If any Work is covered contrary to the written request of Construction Manager, it must, if requested by Construction Manager, be uncovered for Construction Manager’s observation and replaced at Contractor's expense without adjustment of Contract Time or Contract Price.
EXHIBIT 1 955
If Construction Manager considers it necessary or advisable that covered Work be observed by Construction Manager or inspected or tested by others, Contractor, at Construction Manager’s request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as Construction Manager may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. If it is found that such Work is defective, Contractorshall pay all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and the City shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount thereof, the City may make a Claim therefore as provided in these documents. If, however, such Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Times (or Milestones), or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. If the parties are unable to agree as to the amount or extent thereof, Contractor may make a Claim therefore as provided in these documents.
3.4 City's Right to Carry Out the Work
If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents, and fails within 48 hours after receipt of written notice from the City to commence and continue correction of such default or neglect with diligence and promptness, the City may, after 48 hours following receipt by the Contractor of an additional written notice and without prejudice to any other remedy make good such deficiencies.
The City also reserves the right to perform any portion of the Work due to an emergency threatening the safety of the Work, public, City, and any property or equipment.
The Contractor is forewarned that in exercising the rights and remedies under this paragraph, the City shall proceed expeditiously. In connection with such corrective and remedial action, the City may exclude CONTRACTOR from all or part of the Site, take possession of all or part of the Work and suspend CONTRACTOR's services related thereto, take possession of CONTRACTOR's tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which City has paid CONTRACTOR but which are stored elsewhere. CONTRACTOR shall allow the City, City's representatives, agents and employees, City's other contractors, and Construction Manager and Construction Manager's Consultants access to the Site to enable City to exercise the rights and remedies under this paragraph.
All Claims, costs, losses, and damages incurred or sustained by the City in exercising the rights and remedies under this paragraph 3.4 will be charged against CONTRACTOR, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount of the adjustment, City may make a claim therefor as provided in paragraph 7.5.2. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of CONTRACTOR's defective Work.
EXHIBIT 1 956
CONTRACTOR shall not be allowed an extension of the Contract Times (or Milestones) because of any delay in the performance of the Work attributable to the exercise by City of City's rights and remedies under this paragraph 3.4.
3.5 City's Right to Use or Occupy
The City reserves the right, prior to Substantial Completion, to occupy, or use, any completed part or parts of the Work, providing these areas have been approved for occupancy by the City. The exercise of this right shall in no way constitute an acceptance of such parts, or any part of the Work, nor shall it in any way affect the dates and times when progress payments shall become due from the City to the Contractor or in any way prejudice the City's rights in the Contract, or any bonds guaranteeing the same. The Contract shall be deemed completed only when all the Work contracted has been duly and properly performed and accepted by the City.
Prior to such occupancy or use, the City and Contractor shall agree in writing regarding the responsibilities assigned to each of them for payments, security, maintenance, heat, utilities, damage to the Work, insurance, the period for correction of the Work, and the commencement of warranties required by the Contract Documents.
In exercising the right to occupy or use completed parts of the Work prior to the Substantial Completion thereof, the City shall not make any use which will materially increase the cost to the Contractor, without increasing the Contract Amount, nor materially delay the completion of the Contract, without extending the time for completion.
The part or parts of the Work, if any, which the City anticipates the use or occupancy of prior to Substantial Completion, are noted in Paragraph 01010-7.0, Occupancy Requirements.
Failure to include a part of the Work in the above Section, shall not limit the City's right to use or occupy parts of the Work not listed.
3.6 City's Right to Perform Work and to Award Separate Contracts The City reserves the right to perform the work related to the Project with the City's own forces, and to award separate Contracts in connection with the Project or other work on the Site under these or similar Conditions of the Contract. If the Contractor claims that delay, damage, or additional cost is involved because of such action by the City, the Contractor shall make such claim as provided elsewhere in the Contract Documents.
When separate Contracts are awarded for different portions of the Project or other work on the Site, the term "Contractor" in the Contract Documents in each case shall mean the Contractor who executes each separate Agreement.
The City will provide for the coordination of the work of the City's own forces and of each separate Contractor with the Work of the Contractor, who shall cooperate therewith as provided in Paragraph 00700-4.8.3, Cooperation and 01015-3.7 Cooperation with Others.
4.0 CONTRACTOR
4.1 Office
The Contractor's office at the Project Site is hereby designated as the common address of the Contractor for the receipt of documents, samples, notices, letters, and other articles of EXHIBIT 1 957
communication. The Contractor’s legal address, as provided in the Contract, is hereby designated as the address for the receipt of all legal documents and communications.
4.2 Contractor’s Representative
The Contractor shall notify the City in writing of the names of the persons who will act as the Contractor’s representative and his designated alternate, and who shall have the authority to act in matters relating to this Contract. The Contractor, acting through its representative, shall give personal attention to, and shall manage the Work, so that it shall be prosecuted faithfully. The Contractor’s representative shall be an employee of the Contractor. Upon written request of the Contractor, this employment requirement may be waived by the City.
The City’s waiver, if granted, will be in writing. There is no obligation by the City to waive this provision regardless of the effect on the Contractor’s operations. Such waiver may be rescinded by City upon reasonable written notice thereof.
At all times during the progress of the Work, the Contractor’s representative shall be personally present at the Project site, or a designated alternate shall be at the Project site who has the authority to act in matters relating to the Contract. The Contractor’s representative or designated alternate shall have the authority to carry out the provisions of the Contract and to supply materials, equipment, tools, and labor without delay for the performance of the Work.
If neither the Contractor's representative nor a designated alternate is at the Project site, the City acting through the City Representative shall have the authority as provided in Paragraph 00700-6.10, Temporary Suspension of Work, to suspend the work until such a representative is at the Project site.
Before initial work is begun on the Contract, the Contractor shall file with the City Representative, addresses and telephone numbers where the Contractor's and all subcontractors' representatives can be reached during all hours, including nights and weekends when work is not in progress.
4.3 Construction Procedures
The Contractor will supervise and direct the work. The Contractor has the authority to determine the means, methods, techniques, sequences, and procedures of construction, except in those instances where the City, to define the quality of an item of work, specifies in the Contract, a means, method, technique, sequence, or procedure for construction of that item of Work.
4.4 Contractor's Employees
The Contractor shall be responsible for the adequacy, efficiency, and sufficiency of its employees. Workers shall have sufficient knowledge, skill, and experience to perform properly the work assigned to them.
The Contractor shall employ only competent, skillful workers to perform the Work. If any subcontractor or person employed by the Contractor or its subcontractors, appear to the City Representative to be incompetent or act in a disorderly or improper manner, such person or subcontractor shall be discharged from the site immediately by the Contractor upon written direction of the City Representative, and such person shall not again be employed on the Project.
EXHIBIT 1 958
4.5 Subcontractors
The Contractor shall give their personal attention to the fulfillment of the contract and shall keep the work under their control.
Subcontractors will not be recognized as having a direct relationship with the City. The persons engaged in the Work, including employees of subcontractors and suppliers, will be considered employees of the Contractor. The Contractor will be responsible for their work and their work shall be subject to the provisions of the Contract. The Contractor is as fully responsible to the City for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by them as the Contractor is for the acts and omissions of persons directly employed by the Contractor. Nothing contained in the Contract Documents shall create any contractual relation between any subcontractor and the City. References in the Contract Document to actions required of subcontractors, manufacturers, suppliers, or any party other than the Contractor, the City, or the City Representative shall be interpreted as requiring that the Contractor shall require such subcontractor, manufacturer, supplier, utility company, or party to perform the specified action, unless the Contract Documents specifically state that the Work is not included in the Contract.
The Contractor shall not employ any subcontractors that are not properly licensed in accordance with State law. Prior to commencement of any work by a subcontractor, the Contractor shall submit verification to the City Representative that the subcontractor is properly licensed for the work it will perform. Changes to subcontractors listed in the Phase 2 Proposal in accordance with Section 00500 shall be made only with the approval of the City. City’s approval shall not be unreasonably withheld.
4.6 Contractor's Equipment and Facilities
The Contractor shall furnish and maintain in good condition all equipment and facilities as required for the proper execution and inspection of the Work. Such equipment and facilities shall meet all requirements of applicable ordinances and laws.
4.7 Public Safety and Convenience
The Contractor shall conduct its work to make sure that possible obstruction to traffic and inconvenience to the general public and the residents in the vicinity of the Work does not occur and to make sure that the protection of persons and property occurs at no extra cost to the City. The Contractor shall have under construction no greater length or amount of work than it can prosecute properly with due regard to the rights of the public.
4.8 City-Contractor Coordination
4.8.1 Service of Notice - Notice, order, direction, request, or other communication given by the City Representative or City to the Contractor shall be deemed to be well and sufficiently given to the Contractor if delivered to the Contractor's Representative designated in Paragraph 00700-4.2, Contractor's Representative, to the Contractor's office designated in Paragraph 00700-4.1, Office, or to the Contractor's legal address provided in the Contract.
4.8.2 Suggestions to Contractor - Plans or methods of work suggested by the City or City Representative to the Contractor, but not specified or required, if adopted or followed by the Contractor in whole or in part, shall be used at the risk and responsibility of the Contractor.
EXHIBIT 1 959
The City and City Representative assume no responsibility therefor, and in no way will be held liable for any defects in the Work which may result from or be caused by use of such plan or method of work.
4.8.3 Cooperation - The Contractor shall afford the City, the City Representative and separate contractor’s reasonable opportunity for the introduction and storage of their materials and equipment and the execution of their work, and shall connect and coordinate the Work with theirs as required by the Contract Documents.
If any part of the Contractor's Work depends upon work performed by the City or any separate contractor, the Contractor shall, prior to proceeding with the Work, promptly report to the City Representative any apparent discrepancies or defects in such other work that render it unsuitable for such proper execution and results. Failure of the Contractor to so report shall constitute an acceptance of the City's or separate contractor's work as fit and proper to receive the Work, except as to latent defects which subsequently become apparent in such work by others.
If requested by the Contractor, the City shall arrange meetings with other contractors performing work on behalf of the City to plan coordination of construction activities. The City shall keep the Contractor informed of the planned activities of other contractors.
Differences and conflicts arising between the Contractor and other contractors employed by the City or between the Contractor and the workers of the City with regard to their work, shall be submitted to the City for its decision in the matter. If such separate contractor sues the City on account of any delay or damage alleged to have been caused by the Contractor, the City shall notify the Contractor who shall, at the City's election, defend such proceedings at the Contractor's expense. If any judgment or award against the City arises from any such litigation whether defended by City or by Contractor, the Contractor shall pay or satisfy said judgment or award and shall reimburse the City for all attorney's fees and court costs which the City has incurred or for which it is liable.
4.9 Permits
Unless specifically stated to be provided by the City, Contractor shall apply for, obtain, and comply with all the terms, conditions and requirements attached to all permits, bonds and licenses required by local, state, or federal agencies to perform work, construct, erect, test and start up any equipment or facility for this Contract. Permits shall be kept on-site. Where operating permits are required, the Contractor shall apply for and obtain such operating permits in the name of the City and provide the permit in an appropriate frame or file holder when the City accepts substantial completion of the equipment or facility. The Contractor shall give all notices necessary or incidental to the due and lawful prosecution of the work.
Any permits, bonds, licenses and fees therefore required for the performance of work under this Contract and not specifically mentioned in the Contract Documents as to be obtained and paid by the City shall be included in the Contractor's Phase 2 Guaranteed Maximum Price (GMP). Further definition of permitting responsibilities is provided in the Phase 2 Engineering and Design Services Scope of Work.
The Contractor shall be responsible for satisfying all code requirements. Any code inspections will be coordinated by the City Representative. The Contractor shall comply with all construction conditions stipulated in the permits.
EXHIBIT 1 960
The Contractor shall apply for and obtain all safety permits for excavations, tunneling, trenches, construction (building structure, scaffolding, or falsework) and demolition required by CAL/OSHA including but not limited to, the permits required by Labor Code Section 6500.
The Environmental Quality Act of 1970 (Public Resources Code, Sections 21000 to 21176 incl.) may be applicable to permits, licenses and other authorizations which the Contractor must obtain from local agencies in connection with performing the work of the contract. The Contractor shall comply with the provisions of said statutes in obtaining such permits, licenses and other authorizations and they shall be obtained in sufficient time to prevent delays to the work.
In the event that the City has obtained permits, licenses or other authorizations, applicable to the work, in conformance with the requirements in said Environmental Quality Act of 1970, the Contractor shall comply with the provisions of said permits, licenses and other authorizations.
While Contractor will be responsible to prepare in a timely and complete manner the permit applications for those permits identified in this Section, and to comply with all the terms, conditions and requirements attached to all permits, bonds and licenses required by local, state, or federal agencies to perform work, construct, erect, test and startup of any equipment or facility for this Contract, Contractor shall provide the fully completed permit applications to the City to allow the City to submit and pay for the permit applications in the name of the City. Any unreasonable or significant delays caused by the applicable governmental agencies’ failure to timely or properly process permit applications shall be evaluated by the City as a potential Excusable Delay pursuant to Sections 6 and 7 of Section 00700 – General Conditions assuming said delay is not caused by Contractor’s failure to prepare the required permit applications in a timely and/or proper manner.
4.10 Contractor's Responsibility for the Work and Materials Until Substantial Completion of the Work, the Contractor shall have the charge and care of the Work and of the materials to be used therein and shall bear the risk of injury, loss, or damage, to any part thereof (regardless of whether partial payments have been made on such damaged portions of the Work) by the action of the elements or from any other cause, whether or not arising from the non-execution of the Work. The Contractor shall rebuild, repair, restore, and make good all injuries, losses, or damages to any portion of the Work or the materials occasioned by any cause before its completion and acceptance and shall bear the expense thereof (subject to Section 00820), except for such injuries, losses, or damages as are directly and proximately caused by acts of the City.
4.11 Laws to be Observed
The Contractor shall keep fully informed of all existing and future County, State, and Federal laws and regulations and all municipal ordinances and regulations of the City which in any manner affect those engaged or employed in the Work and of all such orders and decrees of bodies having any jurisdiction or authority over the same; and shall protect and indemnify the City and all of its officers, agents, and servants against any claim or liability arising from or based on the violation of any such laws, ordinances, regulations, orders, or decrees whether by the Contractor or its employees. If any discrepancy or inconsistency is EXHIBIT 1 961
discovered in the plans, drawings, specifications or Contract for the Work in relation to any such law, ordinance, regulations, order or decree, the Contractor shall immediately report the same to the City Representative in writing.
4.11.1 Prevailing Wage - The Contractor shall comply with Labor Code Sections 1774 and 1775.
In accordance with said Section 1775, the Contractor shall forfeit, as a penalty to the City of Stockton, $25 for each calendar day or portion thereof, for each workman paid less than the prevailing rates as determined by the Director of Industrial Relations for such work or craft in which such workman is employed for any work done under the contract by him or by any subcontractor under him violation of the provisions of the Labor Code and, in particular, Labor Code Section 1770 and 1780, inclusive.
In addition to said penalty and pursuant to said Section 1775, the difference between such stipulated prevailing wage rates and the amount paid to each workman for each calendar day or portion thereof for which each workman was paid less that the stipulated prevailing wage rate shall be paid to each workman by the Contractor.
Pursuant to provisions of Section 1773 of the Labor Code of the State of California, the City has obtained the general prevailing rate of wages (which rate includes employer payments for health and welfare, vacation, pension, travel time, and subsistence pay as provided for in Section 1773.8 of said Code, apprenticeship or other training programs authorized by Section 3093 of said code and similar purposes) applicable to the work to be done, for straight time, overtime, Saturday, Sunday and holiday work. The holiday wage rate listed shall be applicable to all holidays recognized in the collective bargaining agreement of the particular craft, classification or type of workman concerned. These wage rates are set forth in the Division of Industrial Relations publication entitled "General Prevailing Wage Rates", which is part of the contract.
Pursuant to the provisions of Section 1773.2 of the Labor Code (as amended) the general prevailing wage rates for each craft, classification or type of workman are on file at the Municipal Utilities Department, 2500 Navy Drive, Stockton, California. A copy of said wage rates shall be posted by the Contractor in a prominent place at the site of the work.
The City will not recognize any claim for additional compensation because of the payment by the Contractor of any wage rate in excess of the prevailing wage rate set forth in the contract. The possibility of wage increases is one of the elements to be considered by the Contractor in determining his bid, and will not under any circumstances be considered as the basis of a claim against the City on the contract.
4.11.2 Travel and Subsistence Payments - Attention is directed to the requirements of Section 1773.8 of the Labor Code. The Contractor shall make travel and subsistence payment to each worker, needed to execute the work, in accordance with the requirements in said Section 1773.8.
4.11.3 Certified Payrolls - In accordance with Section 1776 of the Labor Code, each Contractor and subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time, and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the project.
EXHIBIT 1 962
The payroll records shall be certified and submitted to the City, and shall be available for inspection at all reasonable hours at the principal office of the Contractor on the following basis:
a. A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request.
b. A certified copy of all payroll records shall be made available for inspection or furnished upon request to a representative of the City, the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards of the Department of Industrial Relations.
c. A certified copy of all payroll records shall be made available upon request by the public in accordance with Section 1776 of the Labor Code.
The Contractor is responsible for its and its subcontractors’ compliance with the provisions of Section 1776 of the Labor Code.
4.11.4 Overtime Requirements - The Contractor shall forfeit, as a penalty to the City, the penalty as provided in the Labor Code for each worker employed in the execution of the Contract by the Contractor, or any subcontractor under the Contractor, for each day during which such worker is required or permitted to work more than eight (8) hours in any one day and forty (40) hours in any one week, in violation of the provisions of the Labor Code, and in particular, Section 1810 to Section 1815 thereof, inclusive, except that work performed by employees of Contractors in excess of eight (8) hours a day and forty (40) hours during one week, shall be permitted upon compensation for all hours worked in excess of eight (8) hours per day, at not less than one and a half (1.5) times the basic rate of pay as provided for in the Labor Code.
4.11.5 Apprentice and Trainee - Attention is directed to the provisions in Section 1777.5 of the Labor Code and in accordance with the regulations of the California Apprenticeship Council concerning the employment of apprentices by the Contractor or any subcontractor under the Contractor.
Section 1777.5 requires the Contractor or subcontractors employing tradespersons in any apprenticeable occupation to apply to the joint apprenticeship committee nearest the site of the project which administers the apprenticeship program in that trade for a certificate of approval. The Contractor and subcontractors are required to submit contract award information to the applicable joint apprenticeship committee. As provided for in Section 1777.5 of the Labor Code, the Contractor is required to make contributions to funds established for the administration of apprenticeship programs.
It shall be the responsibility of the Contractor to abide by the provisions of Section 1777.5 of the Labor Code and to require all subcontractors employed by or contracting with the Contractor to abide by said provisions. The Contractor shall furnish the City any and all evidence of compliance with this code section when requested by the City.
It is City policy to encourage the employment and training of apprentices on public works contracts as may be permitted under local apprenticeship standards.
EXHIBIT 1 963
For failure to comply with Section 1777.5 of the Labor Code, the Contractor shall be subject to the penalties in Section 1777.7 of the Labor Code.
4.11.6 Workers' Compensation Insurance - The Contractor is required to secure the payment of compensation to its employees in accordance with the provisions of Sections 1860 and 3700 of the Labor Code and Paragraph 00820-2.5, Workers' Compensation Insurance.
4.11.7 Labor Discrimination - Attention is directed to Section 1735 of the Labor Code, which reads as follows:
No discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, or sex of such persons, except as provided in Section 12940 of the Government Code, and every Contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter.
Attention is also directed to the requirement in Section 1431 of the Labor Code and Sections 300 and 317 through 323 of Title 8 of the California Administrative Code that the Contractor shall submit his Equal Employment Opportunity Program and certification fee to the Fair Employment Practice Commission, in the event that the bid price for the contract exceeds $200,000.
4.11.8 Vehicle Code - Pursuant to the authority contained in VehicleCode Section 591, the City has determined that within such areas as are within the limits of the project and are open to public traffic, the following requirements of the Vehicle Code will apply: The lighting requirements in Section 25803; the brake requirements in Division 12, Chapter 3; the splash apron requirements in Section 27600; and, when operated on completed or existing treated base, surfacing, pavement or structures, except as otherwise provided in Section 7-1.02, "Weight Limitations," the weight limitation requirements contained in Division 15.
Attention is directed to the statement in said Section 591 that this section shall not relieve him or any person from duty of exercising due care. The Contractor shall take all necessary precautions for safe operations of his equipment and the protection of the public from injury and damage from such equipment.
Any other requirements set forth in Division 11, 12, 13, 14 and 15 of the Vehicle Code which the Department, pursuant to the authority contained in Vehicle Code Section 591, will require compliance with, will be set forth in the special provisions.
4.11.9 Affirmative Action - Attention is directed to the requirements of the Stockton Municipal Code, Chapter 3, Part V, as amended with reference to the affirmative action requirements for Contractors on Public Works projects of the City of Stockton. Such requirements shall be followed. Guidelines and the necessary reporting requirements are contained in the publication entitled: "Affirmative Action Guidelines and Procedures For Respondents To A City of Stockton Request for Proposals" which is made a part of these specifications by this reference. Failure of the Contractor to conform to the provisions of the City of Stockton's Affirmative Action Program will result in his being subject to the penalties set forth in Section 3-028 of Part V of Chapter 3 of the Stockton Municipal Code.
4.11.10 Local Employment – This project is subject to the requirements of the City’s Local Employment Ordinance at Stockton Municipal Code Section 3.68.095. Contractor shall EXHIBIT 1 964
comply with the City’s Local Employment Ordinance including, without limitation, as follows:
Contractor shall make a good-faith effort, with the assistance of local labor union hiring halls or community organizations designated by the City to employ qualified individuals who are, and have been for one year prior to the effective date of the contract for the Project, residents of the City of Stockton in sufficient numbers so that no less than 50% of the contractor’s total construction work force, including any subcontractor work force, measured in labor work hours, is comprised of Stockton residents.
Contractor and each of its subcontractors shall make a good faith effort to employ apprentices who are enrolled in and participating in a viable apprenticeship program serving the San Joaquin Valley and approved by the State Department of Apprenticeship Standards.
This apprenticeship requirement shall apply for each apprenticable craft or trade in which the Contractor employs workers in performing any of the work under the Contract.
Contractor shall keep, and provide to the City, on standardized forms acceptable to the City (see forms attached at the end of these General Conditions), an accurate record showing the name, place of residence, hours employed and per diem wages and benefits of each person employed by the contractor, and the contractor’s subcontractors, on the specific public works project, including full-time, part-time, permanent and temporary employees.
Contractor shall keep, and provide to the City, on forms acceptable to the City, (see forms attached at the end of these General Conditions) an accurate record documenting the Contractor’s good faith efforts to comply with the local resident employment and apprentice employment provisions of the Local Employment Ordinance. Said records shall include: a listing by name and address of all local recruitment sources contacted by the contractor; the date of the local recruitment contact and the identity of the person contacted; the trade and classification and number of employment referrals requested; the number of local residents employed as a result of the contact; and the identity and address of the person(s) employed pursuant to the contract.
The Contractor shall submit a Final Local Employment Ordinance Report upon completion of the project. Said Final Report shall be considered a final construction punch list item, and failure to submit the report shall be cause for withholding the Notice of Completion and release of retention. The Contractor shall submit a project Final Local Employment Ordinance Report in the suggested form and content attached at the end of these General Conditions.
The Contractor shall provide Monthly Local Employment Ordinance complianceReports as part of the Contractor’s progress pay requests. The form and content of the Monthly Reports shall provide the same information as noted in the forms attached at the end of these General Conditions. Failure to submit said Monthly Reports could result in the City withholding 5% of the monthly progress payment until said report is submitted.
The Contractor shall promptly submit its Good Faith Effort documentation prior to execution of the construction contract. An explanation of the reasons for non-compliance and future good faith efforts which can lead to project compliance will be part of the Monthly Reports.
Monthly Reports shall be compiled with all applicable information and submitted at the end of the project as a part of the Final Report.
EXHIBIT 1 965
The City is a third party beneficiary to each of Contractor’s subcontracts with its subcontractors and the City, as a third party beneficiary, shall have the right to enforce the provisions of the Local Employment Ordinance with regard to that subcontract or seek remedies available under the Local Employment Ordinance should a party to the subcontract fail to comply with any of the provisions of the Local Employment Ordinance that apply to the subcontract. However, nothing set forth herein shall create a contractual relationship, or privity, between the City and any subcontractor.
4.12 Safety
4.12.1 Contractor's Safety Responsibility - The Contractor shall be solely and completely responsible for conditions of the jobsite, including safety of all persons and property during performance of the work. This requirement shall apply continuously and not be limited to normal working hours. Safety provisions shall conform to U.S. Department of Labor (OSHA), the California Occupational Safety and Health Act, and all other applicable Federal, State, County, and local laws, ordinances, codes, the requirements set forth below, and any regulations that may be detailed in other parts of these Contract Documents. Where any of these are in conflict, the more stringent requirement shall be followed.
No provision of the Contract Documents shall act to make the City, the City Representative or any other party than the Contractor responsible for safety. The City Representative shall not have authority for safety on the project. The Contractor shall indemnify, defend and hold harmless the City, City Representative, or other authorized representatives of the City, from and against any and all actions, damages, fines, suits, and losses arising from the Contractor's failure to meet all safety requirements and/or provide a safe work site.
If death or serious injuries or serious damages are caused, the accident shall be reported immediately by telephone or messenger to both the City Representative and the City. In addition, the Contractor must promptly report in writing to the City Representative all accidents whatsoever arising out of, or in connection with, the performance of the Work whether on, or adjacent to, the Site, giving full details and statements of witnesses. The Contractor shall make all reports as are, or may be, required by any authority having jurisdiction, and permit all safety inspections of the work being performed under this Contract.
If a claim is made by anyone against the Contractor or any subcontractor on account of any accident, the Contractor shall promptly report the facts in writing to the City Representative, giving full details of the claim.
4.12.2 Safety Program - The Contractor shall establish, implement, and maintain a written injury prevention program as required by Labor Code Section 6401.7. Before beginning the Work the Contractor shall prepare and submit to the City Representative a Contractor Safety Program that provides for the implementation of all of the Contractor's safety responsibilities in connection with the Work at the site and the coordination of that program and its associated procedures and precautions with safety programs, precautions and procedures of each of its subcontractors and other prime Contractors performing work at the site. The Contractor shall be solely responsible for initiating, maintaining, monitoring, coordinating, and supervising all safety program, precautions, and procedures in connection with the Work and for coordinating its programs, precautions, and procedures of the other prime contractors and subcontractors performing the Work at the site. The Safety Program should contain all the necessary elements for the Contractor to administer its program on site. At a minimum, EXHIBIT 1 966
this written Safety Program shall address the elements required by Labor Code Section 6401.7. The Contractor shall obtain a copy of the City's Municipal Utilities Department's Injury and Illness Prevention Program and the Safety Manual and incorporate appropriate safety procedures into their Safety Program. The Contractor shall also comply with the Department's "Contractor’s Safety Rules" in Section 01500.
The program shall also address the following:
a. Compliance with Laws, Rules, and Regulations
b. Infractions of Safety Rules
1. Reported to Contractor's designated Safety Supervisor
2. Time correction
3. Contractor to enforce safety requirements on its subcontractors
4. Noncomplying employees to be removed from the Project c. Housekeeping
1. Continuous cleaning required
2. Final clean up required
d. Means of Implementing the Program
1. All new employees to receive training on the Contractor's Safety Program prior to starting work.
2. Periodic tool box meetings with agenda recorded
3. Documented safety inspections by Safety Supervisor
4. Establish emergency procedures and telephone numbers including the procedure for the immediate removal to a hospital or a doctor's care of persons who may be injured on the jobsite. The Contractor shall maintain at its office or other well-known place at the Site safety equipment applicable to the Work as prescribed by the aforementioned authorities, and all items necessary for giving first aid to the injured.
5. Project bulletin board with required policies
6. At least two employees on each shift should have First Aid training and maintain a current First Aid card issued by an agency such as the American Red Cross.
7. Completion of a job hazard analysis for specific construction activities.
8. Establish a hazard communication program for informing the Contractor's and subcontractor's personnel, City Representative, City, and other affected parties of specific hazards on the project.
9. Establish a confined space entry program in accordance with Cal OSHA requirements.
e. Define the duties and responsibilities of Contractor management personnel for safety.
1. Project Manager
2. General Superintendent
3. Foreman
4. Safety Supervisor
EXHIBIT 1 967
f. Accident Investigation
1. Investigate all accidents and near misses.
2. Develop steps to prevent a reoccurrence.
3. Completion of all reporting paperwork.
The Contractor's compliance with requirements for safety and/or the City Representative's review of the Contractor's Safety Program shall not relieve or decrease the liability of the Contractor for safety. The City Representative's review of the Contractor's Safety Program is only to determine if the above listed elements are included in the program.
4.12.3 Safety Supervisor - The Contractor shall appoint an employee as safety supervisor who is qualified and authorized to supervise and enforce compliance with the Safety Program. The Contractor shall notify the City Representative in writing prior to the commencement of work of the name of the person who will act as the Contractor's safety supervisor and furnish the safety supervisor's resume to the City Representative.
The Contractor will, through and with his Safety Supervisor, ensure that all of its employees and its subcontractors of any tier, fully comply with the Project Safety Policies. The Safety Supervisor shall be a full-time employee of the Contractor whose responsibility shall include supervising compliance with applicable safety requirements on the work site and for developing and implementing safety training classes for all job personnel. The City shall have the authority to require removal of the Contractor's Safety Supervisor if the representative is judged to be improperly or inadequately performing the duties; however, this authority shall not in any way affect the Contractor's sole responsibility for performing this work safely, nor shall it impose any obligation upon the City to ensure the Contractor perform its work safely.
4.12.4 Safety Coordination Meetings - The Contractor and its affected subcontractors shall attend safety coordination meetings with the City Representative and any other affected parties.
The meeting shall be held at least monthly and prior to the start of new construction activities.
Construction activities will be reviewed prior to the start of work in the various areas to determine potential hazards. The Contractor will be responsible for preparing job hazard analyses to breakdown the activities to be performed in a step-by-step procedure and provide safety guidelines for each step and any special equipment necessary to protect workers. The Contractor will act as facilitator for the meeting. The City Representative will participate in the Safety coordination meetings but will not direct the Contractor on how to perform its safety operations.
4.12.5 Safety and Protection - The Contractor shall take all necessary protection to prevent damage, injury, and loss to:
a. All employees on the Project, employees of all subcontractors, and other persons and organizations who may be affected thereby;
b. All the Work and materials and equipment to be incorporated therein, whether in storage on or off the site; and
EXHIBIT 1 968
c. Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and underground facilities not designated for removal, relocation, or replacement in the course of construction.
The Contractor shall comply with all applicable laws and regulations of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury or loss and shall erect and maintain all necessary safeguards for such safety and protection. The Contractor shall notify owners of adjacent property and of underground facilities and utility owners when prosecution of the Work may affect them and shall cooperate with them in the protection, removal, relocation, and replacement of their property.
All injury or loss to any property caused, directly or indirectly, in whole or in part, by the Contractor, any subcontractor, supplier or any other person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be liable, shall be remedied by the Contractor.
4.12.6 Excavation Safety - In accordance with the provisions of Section 6705 of the Labor Code, the Contractor shall submit, in advance of excavation five feet or more in depth, detailed plans showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from hazard of caving ground during such excavation. If such plans vary from the shoring system standards set forth in the Construction Safety Orders in Title 8, California Code of Regulations, the plans shall be prepared and signed by a registered civil or structural engineer. Shoring, bracing, sloping, or other protective system shall not be less effective than required by the California Construction Safety Orders. The City's review of the Contractor's excavation plan is only for general conformance to the California Construction Safety Orders.
Prior to commencing any excavation, the Contractor shall designate in writing to the City Representative the "competent person(s)" with the authority and responsibilities designated in the Construction Safety Orders.
4.12.7 Safety Emergencies - In emergencies affecting the safety or protection of persons or the Work or property at the site or adjacent thereto, the Contractor, without special instruction or authorization from the City Representative, is obligated to act to prevent threatened damage, injury or loss. The Contractor shall give the City Representative prompt written notice if the Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby.
4.12.8 Safety Violations - Should the Contractor fail to correct an unsafe condition, the City Representative shall immediately notify the City of the Contractor's failure to correct the unsafe condition. The City shall then notify the Contractor through the City Representative that the unsafe condition must be corrected or the work in question will be stopped in accordance with Paragraph 00700-6.10, Temporary Suspension of Work until the condition is corrected to the satisfaction of the City. No extension of time or additional compensation will be granted as a result of any stop order so issued. The notification and suspension of such work or the failure to provide such notification and suspension by the City Representative and City shall not relieve the Contractor of its sole responsibility and liability for safety.
The City shall have the authority to require the removal from the project of the foreman and/or superintendent in responsible charge of the work where safety violations occur.
EXHIBIT 1 969
4.12.9 Equipment Safety Provisions - The completed Work shall include all necessary permanent safety devices, such as machinery guards and similar ordinary safety items, required by the State and Federal (OSHA) industrial authorities and applicable local and national codes.
Further, any features of the Work, including City-selected equipment, subject to such safety regulations shall be fabricated, furnished, and installed in compliance with these requirements. All equipment furnished shall be grounded and provided guards and protection as required by safety codes. Where vapor-tight or explosion-proof electrical installation is required by safety codes, this shall be provided. Contractors and manufacturers of equipment shall be held responsible for compliance with the requirements included herein. The Contractor shall notify all equipment suppliers and subcontractors of the provisions of this paragraph.
4.12.10 Hazard Communication Programs – Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged or among employers at the Site in accordance with Laws or Regulations.
4.13 Review of Contract Documents and Field Conditions by Contractor; Single Point Responsibility of Contractor
In addition to the examination and reviews performed, and obligations assumed, incidental to making the representations set forth in the Contract, Contractor shall carefully study and compare each of the Contract Documents with the others and with information furnished by City, and shall promptly report in writing to City’s Representative any errors, inconsistencies, or omissions in the Contract Documents or inconsistencies with applicable code requirements observed by Contractor. Contractor shall determine the most desirable method of achieving City’s requirements in terms of cost, technology, quality and speed of delivery.
Contractor is responsible for the design and construction of the Project and shall provide all services pursuant to this Contract in a manner consistent with the standard of care under California law applicable to those who specialize in providing such services for projects of the type, scope, and complexity of the Project (including its contracting mode). Contractor shall perform its design services hereunder in accordance with the standard practices applicable to Contractor's field ordinarily used by members of the architectural, engineering, and design professions practicing in the location where the services are to be performed.
Contractor shall perform its construction services in accordance with the best practices applicable to Contractor’s field ordinarily used by member of construction industry in the location where the services are to be performed. Contractor shall furnish the services of all necessary and properly licensed architects, engineers, designers, surveyors, draftsmen and other personnel necessary to perform its services. The Contractor shall be solely responsible for any and all design errors including, without limitation, errors, inconsistencies or omissions in the Construction Documents. Contractor shall take field measurements, verify field conditions, and carefully compare with the Contract Documents such field measurements, conditions, and other information known to Contractor before commencing the Work. Errors, inconsistencies, or omissions discovered at any time shall be promptly corrected.
If Contractor performs any design and/or construction activity which it knows, or should know, involves an error, inconsistency, or omission in relation to the Contract Documents, EXHIBIT 1 970
Contractor shall be responsible for the resultant losses, including, without limitation, the costs of correcting Defective Work.
The design development documents prepared by Contractor shall include drawings and specifications fixing and describing the Project size and character as to site utilization, and other appropriate elements incorporating the civil, structural, geotechnical, architectural, mechanical and electrical systems. The design development documents shall set forth in detail the requirements for the construction of the Work, and shall be based on codes, laws, or regulations enacted at the time of their preparation.
The City does not assume any obligation to employ the Contractor’s services or pay Contractor royalties of any type as to future programs that may result from the Work performed under this Contract.
Contractor shall be responsible for all plotting, printing, copying and distribution cost of any and all documents required in connection with the Work.
Contractor agrees that it has single point responsibility for the design and construction of this Project.
4.14 Design, Supervision and Construction Procedures
Contractor shallsupervise, coordinate, and direct the Work using Contractor’s best skill and attention. Contractor shall be solely responsible for, and have control over, the entire design effort, construction means, methods, techniques, sequences, procedures, and the coordination of all portions of the Work, including, but without limitation, landscape and site work, utilities, and building systems.
Contractor shall be responsible to City for acts and omissions of Contractor’s agents, employees, and subcontractors, of all tiers, and their respective agents and employees.
Contractor shall not be relieved of its obligation to perform the Work in accordance with the Contract Documents either by acts or omissions of City or City’s Representative in the administration of the Contract, or by tests, inspections, or approvals required, or performed, by persons or firms other than Contractor.
Contractor shall be responsible for inspection of all portions of the Work, including those portions already performed under this Contract, to determine that such portions conform to the requirements of the Contract Documents and are ready to receive subsequent Work.
The Contractor is required to deliver to the City, if requested, any and all design materials including, but not limited to, calculations, preliminary drawings, construction drawings, shop drawings, electronic media data, tenant improvement documents, sketches, illustrations, specifications, descriptions, models, mock-ups, and other information developed, prepared, furnished, or delivered in the prosecution of the design work.
Contractor shall at all times participate in, and implement, the CEQA and NEPA mitigation processes and ensure performance as required in the Contract Documents.
Contractor is responsible for preparation of the Construction Documents for the entire Project.
EXHIBIT 1 971
Contractor shall at all times maintain good discipline and order among its employees and subcontractors. Contractor shall provide competent, fully qualified personnel to perform the Work.
4.15 Labor And Materials
Unless otherwise provided in the Contract Documents, Contractor shall provide and pay for all professional services, other services, labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other things necessary for proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.
4.16 Construction Documents
Upon receipt of the Notice to Proceed for Phase 2, the Contractor shall finish the design of the Facilities necessary to secure permits and construct the Facilities, and the preparation of the Construction Documents as defined in Section 01090 - References. The Construction Documents shall provide information and level of detail customarily necessary in documents for design build projects of similar size, complexity, and quality. The Construction Documents shall include all information required by the building trades to complete the construction of the Project, other than such details customarily developed by others during construction. The City’s review of the construction documents shall be conducted in accordance with the approved Contract Schedule. Such review shall not relieve the Contractor from its responsibilities under this Contract. Such review shall not be deemed an approval or waiver by the City of any deviation from, or of the Contractor’s failure to comply with, any provision or requirement of the Contract Documents, unless such deviation or failure has been identified as such in writing in the document submitted by the Contractor and approved by the City.
However, it is acknowledged by the parties hereto that inherent in a design build concept, bridging or otherwise, the production and review of Construction Documents may be a continuing process with portions thereof completed at different times. The Contract Schedule shall indicate the times for the City to review the completion of each such portion of the Construction Documents and a reasonable time for review of same.
The Contractor shall submit completed packages of the Construction Documents for review by the City at the times indicated on the Contract Schedule and as defined in the Contract Documents. Review meetings between the Contractor and the City to review the Construction Document packages, shall be scheduled and held so as not to delay the Work.
The Construction Documents for hazardous and/or toxic abatement efforts and demolition activity shall be of sufficient clarity and shall be fully detailed when submitted to the City for review.
5.0 CONTROL OF WORK AND MATERIALS
5.1 Means and Methods
It is expressly stipulated that the drawings, specifications and other Contract Documents set forth the requirements as to the nature of the completed Work and do not purport to control EXHIBIT 1 972
the method of performing work except in those instances where the nature of the completed Work is dependent on the method of performance.
Except as provided elsewhere in the Contract Documents, neither the City nor the City Representative will be responsible for or have control or charge of construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work. Except as provided elsewhere in the Contract Documents, neither the City nor the City Representative will be responsible for or have control or charge over the acts or omissions of the Contractor, or any of their subcontractors, agents or employees, or any other persons performing any of the Work. Any general control of the Work exercised by the City or its authorized representatives shall not make the Contractor an agent of the City, and the liability of the Contractor for all damages to persons and/or to public or private property arising from the Contractor's execution of the Work shall not be lessened because of such general control.
Neither the observation by the City or City Representative, nor any order, measurement, approved modification, or payment of monies, nor acceptance of any part or whole of the Work by the City, City Representative, or their agents shall operate as a waiver of any provision of the Contract.
Acceptance by the City Representative and/or City of any drawings, or any information regarding materials and equipment the Contractor proposes to furnish or method of work shall not be regarded as an assumption of risks or liability by the City Representative or the City, or any officer or employee thereof, and the Contractor shall have no claim under the Contract on account of the failure or partial failure or inefficiency or insufficiency of any plan or method of work or material and equipment so accepted. Such acceptance shall be considered to mean merely that the City Representative and/or City has no objection to the Contractor using, upon its own full responsibility, the plan or method of work proposed, or furnishing the materials and equipment proposed.
5.2 City-Furnished Materials
Materials, if furnished by the City, will be made available as designated in the General Requirements. The cost of loading, unloading, hauling and handling, and placing City-furnished materials shall be considered as included in the Phase 2 GMP for the Contract item involving such City-furnished material.
Contractor shall inspect and assure itself of the amount and soundness of such materials.
The Contractor will be held responsible for all materials furnished to it, and shall pay all demurrage and storage charges. City-furnished materials lost or damaged from any cause whatsoever shall be replaced by the Contractor. The Contractor will be liable to the City for the cost of replacing City-furnished material and such costs may be deducted from any monies due or to become due the Contractor.
5.3 Defective and Unauthorized Work
The City, City Representative or designated representative, acting for the City, shall have the right at all times and places to reject any articles or materials to be furnished hereunder which, in any respect, fail to meet the requirements of the Contract Documents, regardless of whether the defects in such articles or materials are detected at the point of manufacture or EXHIBIT 1 973
after completion of the Work at the Site. If the City Representative, or other City-designated representative, through an oversight or otherwise, has accepted materials or Work which are defective or in any way contrary to the Contract Documents, such materials, no matter in what stage or condition of manufacture, delivery, or erection, may be rejected and shall not relieve the Contractor of its obligation to correct such Work.
Upon completion of any Corrective Work to bring the work in conformance with the Contract Documents, materials and workmanship that remain in nonconformance to the requirements of the Contract Documents shall be considered defective and will be subject to rejection. Defective Work or material, whether in place or not, shall be removed immediately from the Site by the Contractor, at its expense, when so directed by the City Representative.
Any work done beyond the limits of work, lines, and grades shown on any approved plans or established by the City Representative, or any extra work done without written authority, will be considered as unauthorized and will not be paid for.
Upon failure on the part of the Contractor to comply with any order of the City Representative made under the provisions of this paragraph, the City Representative shall have authority to require special inspection and testing to verify if work is defective.
Confirmed defective work shall be remedied, or removed and replaced, and unauthorized work be removed. The costs thereof will be deducted from any monies due or to become due the Contractor. The time, cost and compliance requirements stipulated in Paragraph 00700-
3.4, City's Right to Carry Out the Work, shall apply for this paragraph also.
Contractor shall have full responsibility for and pay for the removal and replacement of Defective Work. City's prior review of Submittals and/or prior failure to notice Defective Work in place shall not relieve Contractor of this requirement.
5.4 Unnoticed Defects
Any defective work or material that may be discovered by the City or City Representative before the final acceptance of the Work, or before final payment has been made, or during the warranty period, shall be removed and replaced by work and materials which shall conform to the provisions of the Contract Documents. Failure on the part of the City or City Representative to condemn or reject bad or inferior work or materials shall not be construed to imply acceptance of such work or materials.
5.5 Right to Retain Imperfect Work
If any part or portion of the work performed or material furnished under this Contract shall prove defective and not in accordance with the Drawings and Specifications, and if the imperfection in the same shall not be of sufficient magnitude or importance as to make the work dangerous or unsuitable, or if the removal of such work will create conditions which are dangerous or undesirable, the City shall have the right and authority to retain such work and may make such deductions in the final payment therefor as may be just and reasonable.
6.0 PROGRESS OF THE WORK
EXHIBIT 1 974
6.1 Beginning of Work
The Contractor shall begin work within ten (10) days of the effective date of the Notice to Proceed and shall diligently prosecute the same to completion within the time limit.
Should the Contractor begin work in advance of receiving Notice to Proceed, any work performed in advance of the said date of approval shall be considered as having been done by the Contractor at its own risk.
6.2 Time of Completion
Time shall be of the essence of the Contract. The Contractor shall prosecute the work so that the project shall be complete and ready for use within the time specified in Section 00500. It is expressly understood and agreed by and between the Contractor and the City that the Contract time for completion of the work described herein is a reasonable time taking into consideration the average climatic and economic conditions and other factors prevailing in the locality and the nature of the work.
6.3 Delays
6.3.1 Notice of Delays - When the Contractor foresees a delay in the prosecution of the Work and, in any event, as soon as practical but no later than 1 day from the occurrence of a delay, the Contractor shall notify the City Representative in writing of the probability of the occurrence and the estimated extent of the delay, and its cause. The Contractor shall take immediate steps to prevent, if possible the occurrence or continuance of the delay. The Contractor agrees that no claim shall be made for delays which are not called to the attention of the City Representative within 1 day from the time of their occurrence.
6.3.2 Non-excusable Delays - Non-excusable delays in the prosecution of the Work shall include delays which could have been avoided by the exercise of care, prudence, foresight, and diligence on the part of the Contractor or its subcontractors, at any tier level, or suppliers.
6.3.3 Excusable Delays - Excusable delays in the prosecution or completion of the Work shall include delays which result from causes beyond the control of the Contractor and which could not have been avoided by the exercise of care, prudence, foresight, and diligence on the part of the Contractor or its subcontractors, at any tier level, or suppliers.
6.3.3.1 Abnormal Delays - Delays caused by acts of god, fire, unusual storms, floods, tidal waves, earthquakes, strikes, labor disputes, and freight embargoes, shall be considered as excusable delays insofar as they prevent the Contractor from proceeding with at least seventy-five (75) percent of the normal labor and equipment force for at least five (5) hours per day toward completion of the current critical activity item(s) on the latest favorably reviewed progress schedule.
6.3.3.2 Weather Delays - Should inclement weather conditions or the conditions resulting from weather prevent the Contractor from proceeding with seventy-five (75) percent of the normal labor and equipment force engaged in the current critical activity item for a period of at least five (5) hours per day toward completion of such operation or operations, and the crew is dismissed as a result thereof, it shall be a weather delay day. The Contractor shall be granted a time extension pursuant to Paragraph 00700-6.4.2.c, Weather Delays.
EXHIBIT 1 975
6.3.3.3 Material Shortages - Upon the submission of satisfactory proof to the City Representative by the Contractor, shortages of material may be acceptable as grounds for granting a time extension. In order that such proof may be satisfactory and acceptable to the City Representative, it must be demonstrated by the Contractor that the Contractor has made every effort to obtain such materials, or obtain acceptable substitute materials, from all known sources within reasonable reach of the proposed Work. Only the physical shortage of material, caused by unusual circumstances, will be considered under these provisions as a cause for extension of time, and no consideration will be given to any claim that material could not be obtained at a reasonable, practical, or economical cost or price, unless it is shown to the satisfaction of the City Representative that such material could have been obtained only at exorbitant prices entirely out of line with current rates, taking into account the quantities involved and usual practices in obtaining such quantities. A time extension for shortage of material will not be considered for material ordered or delivered late or whose availability is affected by virtue of the mishandling of procurement. The above provisions apply equally to equipment to be installed in the work.
6.3.4 Compensable Delays - Compensable delays in the prosecution or completion of the Work shall include delays that occur through no fault of the Contractor and prevent the Contractor from proceeding with at least seventy-five (75) percent of the normal labor and equipment force for at least five (5) hours per day toward completion of the current critical activity item(s) on the latest favorably reviewed progress schedule due to the following cause(s):
a. Delays due solely to the actions and/or inactions of the City. b. Delays due to differing site conditions as defined in Paragraph 00700-7.3, Differing Site Conditions.
c. Delays due to other Contractors employed by the City who materially interfere with the Contractor's prosecution of the Work as defined above.
No delay shall be compensable unless the claimed event or occurrence delays completion of the work beyond the contractual completion date or the completion date shown in the accepted initial or updated schedules, and the delay affects a critical activity while such activity is on the critical path and is beyond the control of the Contractor.
6.3.5 Concurrent Delays - Concurrent delays are those delay periods when the prosecution of the Work is delayed during the same period of time due to causes from a combination of the delays defined in Paragraphs 00700-6.3.2, Non-Excusable Delays, 00700-6.3.3, Excusable Delays, or 00700-6.3.4, Compensable Delays. During such concurrent delay periods, time extensions will be granted in accordance with Paragraph 00700-6.4, Time Extensions; however, the Contractor shall not be compensated for its overhead costs as defined in Paragraph 00700-6.4.3 Delay Damages, and the City shall not assess its actual costs as defined in Paragraph 00700-6.4.1, Non-excusable Delays.
6.4 Time Extensions
6.4.1 Non-excusable Delays - The City upon agreement by the Contractor may grant an extension of time for non-excusable delays if the City deems it is in its best interest. If the City grants an extension of time for non-excusable delays, the Contractor agrees to pay the City's actual costs, including charges for engineering, inspection and administration incurred during the extension.
EXHIBIT 1 976
6.4.2 Excusable or Compensable Delays - If the Contractor is delayed in the performance of its work as defined in Paragraphs 00700-6.3.3, Excusable Delays, or 00700-6.3.4, Compensable Delays, then the Contract completion date may be extended by the City for such time that, in the City's and City Representative's determination, the Contractor's completion date will be delayed, provided that the Contractor strictly fulfills the following:
a. The Contractor shall provide notification, in accordance with Paragraph 00700-6.3.1, Notice of Delays, and submit in writing a request for an extension of time to the City Representative stating at a minimum the probable cause of the delay and the number of days being requested. If requested by the City Representative, the time extension request shall be submitted in accordance with the requirements of Paragraph 01310-4.0, TIME IMPACT ANALYSES.
b. If requested by the City Representative, the Contractor shall promptly provide sufficient information to the City Representative to assess the cause or effect of the alleged delay, or to determine if other concurrent delays affected the work. c. Weather Delays. The Contractor will be granted a non-compensable time extension for weather caused delays, pursuant to Paragraph 00700-6.3.3.2, Weather Delays.
Should the Contractor fail to fulfill any of the foregoing, which are conditions precedent to the right to receive a time extension, the Contractor waives the right to receive a time extension.
During such extension of time, neither extra compensation for engineering, inspection and administration nor damages for delay will be charged to the Contractor. It is understood and agreed by the Contractor and City that time extensions due to excusable or compensable delays will be granted only if such delays involve controlling operations which would prevent completion of the whole Work within the specified Contract time.
Should the Contractor fail to complete the work within the time specified in the contract, as extended in accordance with this clause if appropriate, the Contractor shall pay to the City liquidated damages in accordance with Paragraph 00700-6.5, Liquidated Damages.
6.4.3 Delay Damages
For a Compensable Delay, the Contractor shall only be entitled to an adjustment in the GMP in an amount equal to the cost of the work set forth in Section 00500 Exhibit Q incurred by the Contractor and its design professionals and subcontractors/suppliers of every tier who can prove they incurred additional costs as a result of the Compensable Delay. Except as provided herein, the Contractor shall have no claim for damage or compensation for any delay including not limited to extended field costs, extended home office overhead costs, impact, inefficiency, unabsorbed home office overhead, underabsorbed home office overhead, hindrance, disruption, or any other damage arising from delay, not matter how characterized, including delay claims of its design professionals, and subcontractors/suppliers of every tier.
6.5 Liquidated Damages
EXHIBIT 1 977
It is agreed by the parties to the Contract that time is of the essence in the completion of this Work, and that in case all the Work called for under the Contract is not completed before or upon the expiration of the time limit as set forth in these Contract Documents, as modified by extensions of time granted by the City, damage will be sustained by the City. As it is impracticable to determine the actual delay damage; it is, therefore, agreed that the Contractor shall pay liquidated damages to the City in the amount set forth in Section 00500 – Progressive Design-Build Contract, per day for each and every day's delay beyond the time(s) prescribed to complete the Work. The Contractor agrees to pay such liquidated damages and in case the same are not paid, agrees that the City may deduct the amount thereof from any monies due or that may become due the Contractor under the Contract.
6.6 Reserved
6.7 Termination By City For Cause
Subject to prior notice from City and Contractor’s cure rights set forth in this Section, City will have the right to terminate the Contract for cause after the occurrence of any of the following events:
(a) Contractor becomes insolvent or files for relief under the bankruptcy laws of the United States.
(b) Contractor makes a general assignment for the benefit of its creditors or fails to pay its debts as the same become due.
(c) A receiver is appointed to take charge of Contractor’s property. (d) The Work is not completed with the applicable Contract Time, as such Contract Time may be adjusted in accordance with this Contract, and Contractor is not diligently prosecuting the completion or correction of the Work. (e) Contractor persistently or repeatedly refuses or fails to supply skilled supervisory personnel, an adequate number of properly skilled workers, proper materials, or necessary equipment to prosecute the Work in accordance with the Contract Documents.
(f) Contractor fails to make prompt payment of amounts properly due subcontractors after receiving payment from City.
(g) Contractor disregards Applicable Code Requirements. (h) Contractor persistently or materially fails to execute the Work in accordance with the Contract Documents.
(i) Contractor is in default of any other material obligation under the Contract Documents.
(j) Contractor persistently or materially fails to comply with applicable safety requirements.
(k) Contractor abandons the Work.
Upon the occurrence of any of the preceding events, City will have the right to terminate the Contract for cause if Contractor fails to promptly commence to cure such default and diligently prosecute such cure within 5 days after notice from City, or within such longer period of time as is reasonably necessary to complete such cure.
EXHIBIT 1 978
Upon any of the occurrences and subject to the cure rights referred to above, City may, at its election and by notice to Contractor, terminate the Contract and take possession of the Project site and all materials, supplies, equipment, tools, and construction equipment and machinery thereon owned by Contractor; accept the assignment of any or all of the subcontracts; and then complete the Work by any method City may deem expedient. If requested by City, Contractor shall remove any part or all of Contractor’s materials, supplies, equipment, tools, and construction equipment and machinery from the Project site within 7 days of such request; and if Contractor fails to do so, City may remove or store, and after 90 days sell, any of the same at Contractor’s expense.
If the Contract is terminated by City as provided in this Section, Contractor shall not be entitled to receive any further payment until the expiration of 35 days after Final Completion and acceptance of all Work by City.
If the unpaid balance of the GMP exceeds the cost of completing the Work, including all additional costs and expenses made necessary thereby, including costs for City staff time, plus all losses sustained, including any liquidated damages provided under the Contract Documents and subject to provisions of this Contract that survive termination, fifty (50) percent of such excess shall be paid to Contractor. If such costs, expenses, losses, and liquidated damages exceed the unpaid balance of the GMP, Contractor shall pay such excess to City.
No termination or action taken by City after termination shall prejudice any other rights or remedies of City provided by law or by the Contract Documents upon such termination; and City may proceed against Contractor to recover all losses suffered by City.
6.8 Suspension by City For Convenience
City may, at any time and from time to time, without cause, order Contractor, in writing, to suspend, delay, or interrupt the Work in whole or in part for such period of time, up to 90 days, as City may determine, with such period of suspension to be computed from the date of delivery of the written order. Such order shall be specifically identified as a “Suspension Order” under this Section. The Work may be stopped for such further period as the parties may agree. Upon receipt of a Suspension Order, Contractor shall, at City’s expense, comply with its terms and take all reasonable steps to minimize costs allocable to the Work covered by the Suspension Order during the period of Work stoppage. Within 90 days after the issuance of the Suspension Order, or such extension to that period as is agreed upon by Contractor and City, City shall either cancel the Suspension Order or delete the Work covered by such Suspension Order by issuing a Change Order.
If a Suspension Order is canceled or expires, Contractor shall continue with the Work. A Change Order will be issued to cover any adjustments of the GMP or the Contract Time necessarily caused by such suspension. Any Claim by Contractor for an adjustment of the GMP or the Contract Time shall be made within 60 days after the end of the Work suspension. Contractor agrees that submission of its claim within said 60 days is an express condition precedent to its right to recover on such a claim.
The provisions of this Section shall not apply if a Suspension Order is not issued by City. A Suspension Order shall not be required to stop the Work as permitted or required under any other provision of the Contract Documents.
EXHIBIT 1 979
6.9 Termination By City For Convenience
City may, at its option, terminate this Contract, in whole or from time to time in part, at any time by giving notice to Contractor. Upon such termination, Contractor agrees to waive any claims for damages, including loss of anticipated profits, on account thereof; and, as the sole right and remedy of Contractor, City shall pay Contractor in accordance with this Section.
Upon receipt of notice of termination under this Section, Contractor shall, unless the notice directs otherwise, do the following:
(a) Immediately discontinue the Work to the extent specified in the notice. (b) Place no further orders or subcontracts for materials, equipment, services, or facilities, except as may be necessary for completion of such portion of the Work as is not discontinued.
(c) Promptly cancel, on the most favorable terms reasonably possible, all orders and subcontracts to the extent they relate to the performance of the discontinued portion of the Work.
(d) Thereafter do only such Work as may be necessary to preserve and protect Work already in progress and to protect materials, plants, and equipment on the Project site or in transit thereto.
Upon such termination, the obligations of the Contract shall continue as to portions of the Work already performed and, subject to Contractor’s obligations under this Section above, as to bona fide obligations assumed by Contractor prior to the date of termination.
Upon such termination, City shall pay to Contractor, consistent with Cost of the Work as defined in Exhibit Q of Section 00500, the sum of the following:
(a) The amount of the GMP allocable to the portion of the Work properly performed by Contractor as of the date of termination, less sums previously paid to Contractor. (b) Plus previously unpaid costs of any items delivered to the Project site or in-transit or items stored offsite which were fabricated for subsequent incorporation in the Work, subject to in-transit or items stored offsite being delivered to Project site. (c) Plus any proven losses with respect to materials and equipment directly resulting from such termination.
(d) Plus reasonable demobilization costs.
(e) Plus reasonable costs of preparing a statement of the aforesaid costs, expenses, and losses in connection with such termination.
The above payment shall be the sole and exclusive remedy to which Contractor is entitled in the event of termination of the Contract by City pursuant to this Section; and Contractor will be entitled to no other compensation or damages and expressly waives same.
6.10 Temporary Suspension of Work
6.10.1 If the Contractor fails to correct defective work as required by Paragraph 00700-5.3, Defective and Unauthorized Work, or fails to carry out the Work in accordance with the Contract Documents or any other applicable rules and regulations, the City, by a written order of the City's representative or signed personally by an agent specifically so empowered by the City, in writing, may order the Contractor to stop the work, or any portion thereof, until the cause for such order has been eliminated; however, this right of the City to stop the EXHIBIT 1 980
Work shall not give rise to any duty on the part of the City to exercise this right for the benefit of the Contractor or any other person or entity. All delays in the Work occasioned by such stoppage shall not relieve the Contractor of any duty to perform the Work or serve to extend the time for its completion. Any and all necessary corrective work done in order to comply with the Contract Documents shall be performed at no cost to the City.
6.10.2 In the event that a suspension of Work is ordered, as provided in this paragraph, the Contractor, at its expense, shall perform all work necessary to provide a safe, smooth, and unobstructed passageway through construction for use by public, pedestrian, and vehicular traffic, during the period of such use by suspension. Should the Contractor fail to perform the Work as specified, the City may perform such work and the cost thereof may be deducted from monies due the Contractor under the Contract.
6.10.3 The City shall also have authority to suspend the Work wholly or in part, for such period as the City may deem necessary, due to unsuitable weather, or to such other conditions as are considered unfavorable for the suitable prosecution of the Work. Such temporary suspension of the Work will be considered justification for time extensions to the Contract in an amount equal to the period of such suspension if such suspended work includes the current critical activity on the latest favorably reviewed progress schedule. The Contractor as directed by the City shall provide the provisions as stipulated in Paragraph 00700-6.10.2 above. Such additional work shall be compensated as provided for in Paragraph 00700-7.0, CHANGES IN THE WORK.
7.0 CHANGES IN THE WORK
7.1 Changes
The City reserves the right to make such alterations, deviations, additions to or omissions from the plans and specifications, including the right to increase or decrease the quantity of any item or portion of the work, as may be deemed by the City to be necessary or advisable and to require such extra work as may be determined by the City to be required for the proper completion or construction of the whole work contemplated. Such changes, no matter how many, shall be within the contemplation of this Contract. Procedures for changes shall be consistent with Section 01035 MODIFICATION PROCEDURES.
Any such changes will be set forth in a contract change order which will specify, in addition to the work to be done in connection with the change made, adjustment of contract time, if any, and the basis of compensation for such work. A contract change order will not become effective until approved by the authorized City official and/or the City Council.
Cumulative change orders which exceed the charter limit [$75,000 as of March 1, 2015] and plus ten percent of the initial contract price over one hundred thousand dollars ($100,000) require City Council approval. Change orders not meeting the above criteria require approval by the City official executing this contract the dollar amounts of change orders approved by specific city council actions, plus the dollar amounts of any change orders which predate such specific City Council action, shall not be counted in computing the authority limits set forth above for City officials to approve change orders hereunder.
In emergency situations, the authorized City official may issue a change order beyond the authority limits described above in order to:
EXHIBIT 1 981
(a). Prevent interruption of the work which would result in a substantial increase in the costs to, or liability of, City; or
(b). Protect the work, equipment, materials to be used in the work, human safety, or the environment at or near the work from substantial and immediate danger or injury; or (c). Protect, where damage or injury has occurred, the work, equipment or materials to be used in the work, human safety, or the environment at or near the site of the work from further or additional damage or injury or deterioration.
The authorized City official shall have the authority to issue change orders in such sums as is reasonably necessary for such emergency purposes. After issuing a change order in an emergency situation described above, the authorized City official shall report such action and the reasons therefor to the City Council in writing not later than its next regularly scheduled meeting or as soon thereafter as is practicable.
Upon receipt of an approved contract change order, the Contractor shall proceed with the ordered work. If ordered in writing by the City Representative, the Contractor shall proceed with the work so ordered prior to actual receipt of an approved contract change order therefor. In such cases, the City Representative will, as soon as practicable, issue an approved contract change order for such work and the provisions in Paragraph 7.1.1, Procedure and Protest, shall be fully applicable to such subsequently issued contract change order.
When the compensation for an item of work is subject to adjustment under the provisions of Paragraph 00700-7.1, Changes, the Contractor shall, upon request, promptly furnish the City Representative with adequate detailed cost data for such item of work consistent with Section 01035, Modification Procedures.
7.1.1 Procedure and Protest - A contract change order approved by the City may be issued to the Contractor at any time. Should the Contractor disagree with any terms or conditions set forth in an approved contract change order which has not been executed, he shall submit a written protest to the City within 15 days after the receipt of such approved contract change order.
The protest shall state the points of disagreement, and if possible, the contract specification references, quantities, and costs involved. If a written protest is not submitted, payment will be made as set forth in the approved contract change order and such payment shall constitute full compensation for all work included therein or required thereby. Such unprotested approved contract change orders will be considered as executed contract change orders as that term is used in this Section.
Where the protest concerning an approved contract change order relates to compensation, the compensation payable for all work specified or required by said contract change order to which such protest relates will be determined as provided in Paragraphs 00700-7.1.2 to 7.1.4, inclusive. The Contractor shall keep full and complete records of the cost of such work and shall permit the City to have such access thereto as may be necessary to assist in the determination of the compensation payable for such work.
Where the protest concerning an approved contract change order relates, to the adjustment of contract time for the completion of the work, the time to be allowed therefor will be determined as provided in Paragraph 00700-6.5, Liquidated Damages.
EXHIBIT 1 982
Proposed contract change orders may be presented to the Contractor for his consideration prior to approval by the City. If the Contractor signifies his acceptance of the terms and conditions of such proposed contract change order by executing such documents and if such change order is approved by the City Manager or City Council and issued to the Contractor, payment in accordance with the provisions as to compensation therein set forth shall constitute full compensation for all work included therein or required thereby. A contract change order executed by the City Manager or City Council is an executed contract change order as that term is used in Paragraph 00700-7.1.2 to 7.1.4, inclusive. An approved contract change ordershall supersede a proposed, but unapproved, contract change order covering the same work.
7.1.2 Eliminated Items - The City reserves the right to eliminate any contract item of work prior to the award of the contract without incurring any obligation to pay therefor. Should any contract item of the work be eliminated in its entirety following the award of the contract and in the absence of an executed contract change order covering such elimination, payment will be made to the Contractor for actual costs incurred in connection with such eliminated contract item if incurred prior to the date of notification in writing by the City of such elimination.
If acceptable material is ordered by the Contractor for the eliminated item prior to the date of notification of such elimination by the City, and if orders for such material cannot be canceled, it will be paid for at the actual cost to the Contractor. In such case, the material paid for shall become the property of the City and the actual cost of any further handling will be paid for by the City. If the material is returnable to the vendor and if the City so directs, the material shall be returned and the Contractor will be paid for the actual cost of charges made by the vendor for returning the material. The actual cost of handling returned material will be paid for.
The actual costs or charges to be paid by the City to the Contractor as provided in this Paragraph 00700-7.1.2 will be determined consistent with the Cost of the Work as defined in Section 00500.
7.1.3 RESERVED
7.1.4 Extra Work - New, unforeseen work will be classed as extra work when determined by the City that such work is not covered in the GMP. Extra work also includes work specifically designated as extra work in the plans and specifications.
The Contractor shall do such extra work and furnish labor, material, and equipment therefore upon receipt of an approved contract change order or written emergency order of the City, and in the absence of such approved contract change order or written emergency order of the City he shall not be entitled to payment of such extra work.
7.2 Change Orders
7.2.1 Without invalidating the Contract and without notice to sureties or insurers, the City through the City Representative, may at any time or from time to time, order additions, deletions, or revisions in the Work; these will be authorized by Field Order or Change Order. A Change Order will not be issued for a Field Directive unless the City Representative concurs with an appeal by the Contractor that such Field Directive is a change in the scope of the Contract.
The Contractor shall comply promptly with the requirements for all Change Orders or Field EXHIBIT 1 983
Orders. The work involved in Change Orders shall be executed under the applicable conditions and requirements of the Contract Documents. If any Field Order causes an increase or decrease in the Contract Sum or an extension or shortening of the Contract Time, an equitable adjustment will be made by issuing a Change Order. If the Contractor accepts a Change Order that does not include a time extension, the Contractor waives any claim for additional time for the work covered by that Change Order. Additional or extra work performed by the Contractor without written authorization of a Field Order or Change Order will not entitle the Contractor to an increase in the Contract Sum or an extension of the Contract Time.
7.2.2 RESERVED
7.2.3 In case any change increases or decreases the work shown, the Contractor shall be paid for the work actually done at a mutually agreed upon adjustment to the GMP, based upon the provisions of Section 01035 - MODIFICATION PROCEDURES
7.2.4 If the Contractor refuses to accept a Change Order, the City may issue it unilaterally. The Contractor shall comply with the requirements of the Change Order. The City shall provide for an equitable adjustment to the Contract, and compensate the Contractor accordingly. If the Contractor does not agree that the adjustment is equitable, it may submit a claim in accordance with Paragraph 00700-7.6, Claims.
7.2.5 Elimination of Work
In accordance with section 7.1.2 above, the City shall be allowed and authorized to eliminate portions of work from the Contract Work at its discretion, and in the best interests of the public, during the course of action of the Project, and not only prior to award of contract.
Said elimination of work shall not be determined to be a Termination for Convenience even if said elimination brings the Contract Work to a close. Upon elimination of work under this provision, the payment provisions of 7.1.2 shall apply.
7.3 Differing Site Conditions
The Contractor shall promptly, and before such conditions are disturbed, notify the City Representative in writing, including, where applicable, pursuant to Public Contract Code Section 7104, of any:
(a). Material that the Contractor believes may be material that is a hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.
(b). Subsurface or latent physical conditions at the site differing from those indicated.
(c). Unknown physical conditions at the site of any unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract.
The City shall promptly, investigate the conditions, and if it finds that the conditions do materially differ, or do involve hazardous waste, and cause a decrease or increase in the EXHIBIT 1 984
Contractor's cost of, or the time required for, performance of any part of the work the City shall cause to be issued a change order under the procedures provided in Paragraph 00700-
7.2, Change Orders.
In the event that a dispute arises between the City and the Contractor whether the conditions materially differ, or involve hazardous material or waste, or cause a decrease or increase in the Contractor's cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all work to be performed under the Contract. The Contractor shall retain any and all rights provided either by Contract or by law which pertain to the resolution of disputes and protests between the contracting parties, Paragraph 00700 –
7.6, Claims, and 00700 – 7.7, Dispute Resolution.
No claim of the Contractor under this clause shall be allowed unless the Contractor has given the notice required.
7.4 Changes to Construction Documents
Following City approval of Construction Documents issued for construction by Contractor, as construction documents are modified and updated, the revised versions will be provided to the City, identified as revised documents and marked to clearly identify the changes.
Proposed material changes to the design or design intent shall be brought to the attention of the City Representative prior to implementing the change with reasonable time (10 calendar days maximum) allowed for City review of the proposed change for contract compliance.
Such changes include but are not limited to significant reorientation of major equipment, substitution of materials or equipment, changes affecting accessibility for maintenance, other changes potentially impacting operations or maintenance activities.
7.5 Contract Interpretation
7.5.1 Contract Interpretation by the City Representative - Questions regarding the meaning and intent of the Contract Documents shall be referred in writing by the Contractor via Request for Clarification (RFC) to the City Representative. Where practical, the City Representative shall respond to the Contractor in writing with a decision within ten (10) days of receipt of the request.
7.6 Claims
The term “Claim” means a written demand or assertion by Contractor seeking an adjustment or interpretation of the terms of the Contract Documents, payment of money, extension of time, or other relief with respect to the Contract Documents, including a determination of disputes or matters in question between City and Contractor arising out of or related to the Contract Documents or the performance of the Work. A Claim shall be served if the City Representative and Contractor are unable to informally resolve a disagreement. However, the term “Claim” shall not include, and the Claims procedures provided under this Section, including but not limited to arbitration, shall not apply to the following:
(a) Claims respecting penalties for forfeitures prescribed by statute or regulation that a government agency is specifically authorized to administer, settle, or determine.
EXHIBIT 1 985
(b) Claims respecting personal injury, death, reimbursement, or other compensation arising out of or resulting from liability for personal injury or death. (c) Claims respecting stop notices.
A Claim arises upon the issuance of a written final decision denying in whole or in part Contractor’s Change Order Request pursuant to Section 7.1 of the General Conditions.
A Claim must include the following:
(a) A statement that it is a Claim and a request for a decision pursuant to Section 7 of the General Conditions.
(b) A detailed factual narrative of events fully describing the nature and circumstances giving rise to the Claim, including but not limited to, necessary dates, locations, and items of work affected.
(c) A certification, executed by Contractor, that the claim is filed in good faith. The certification language is identified below. The language of the Claim Certification form may not be modified.
(d) A certification, executed by each subcontractor claiming not less than 5% of the total monetary amount sought by the claim, that the subcontractor’s portion of the claim is filed in good faith. The certification language is identified below. The language of the Claim Certification form may not be modified. (e) A statement demonstrating that a Change Order Request was timely submitted as required by Section 7 of the General Conditions.
(f) If a Cost Proposal or declaration was required by Section 7 of the General Conditions and Section 01035, a statement demonstrating that the Cost Proposal or the declaration was timely submitted as required by Section 7 of the General Conditions.
(g) A detailed justification for any remedy or relief sought by the Claim, including to the extent applicable, the following:
If the Claim involves Extra Work, a detailed cost breakdown of the amounts claimed, including the items specified in Section 7 of the General Conditions and Section 01035. The cost breakdown must be provided even if the costs claimed have not been incurred when the Claim is submitted. To the extent costs have been incurred when the Claim is submitted, the Claim must include actual cost records (including without limitation, payroll records, material and rental invoices and the like) demonstrating that costs claimed have actually been incurred. To the extent costs have not yet been incurred at the time the Claim is submitted, actual cost records must be submitted on a current basis not less than once a week during any periods costs are incurred. A cost record will be considered current if submitted within 14 days of the date the cost reflected in the record is incurred. At the request of the City’s Representative, claimed extra costs may be subject to further verification procedures (such as having an inspector verify the performance of alleged Extra Work on a daily basis). The cost breakdown must include an itemization of costs for i) labor including names, classifications, regular hours and overtime hours worked, dates worked, and other pertinent information; ii) materials stored or incorporated in the work including invoices, purchase orders, location of materials either stored or incorporated into the work, dates materials were transported to the project or incorporated into the work, and other pertinent information; and iii) itemization of machinery and equipment including make, EXHIBIT 1 986
model, serial number, hours of use, dates of use and equipment rental rates of any rented equipment.
If the Claim involves an extension of the Contract Time, written documentation demonstrating the Contractor’s entitlement to a time extension under Section 6 of the General Conditions and Section 01310, including the specific dates for which a time extension is sought and the specific reasons for entitlement of a time extension, must be submitted. The Contract Schedule must demonstrate Contractor’s entitlement to an adjustment of Contract Time under Section 6 of the General Conditions and Section 01310.
If the Claim involves an adjustment of the GMP for delay, written documentation demonstrating the Contractor’s entitlement to such an adjustment under Section 6 of the General Conditions and Section 01310 must be submitted. The Contract Schedule must demonstrate Contractor’s entitlement to such an adjustment under Section 6 of the General Conditions and Section 01310.
For each claim submitted or filed by Contractor, including, but not limited to, any claim on behalf Contractor and/or any claim by or on behalf of any subcontractor or supplier, of any tier, Contractor shall include the following certification, signed in the same manner as the Contract was signed:
I, , being the (must be an officer) of (general contractor), declare under penalty of perjury under the laws of the State of California, and do personally certify and attest that: I have thoroughly reviewed the attached claim for additional compensation and/or extension of time, and know its contents and said claim is made in good faith; the supporting data is truthful and accurate; that the amount requested accurately reflects the Contract adjustment for which the Contractor believes the City is liable; and, further, that I am familiar with California Penal Code Section 72 and California Government Code Section 12650, et. seq., pertaining to false claims, and further know and understand that submission or certification of a false claims many lead to fines, imprisonment and/or severe legal consequences.”
7.6.1 Assertion of Claims
Claims by Contractor shall be first submitted to City’s Representative for decision.
Notwithstanding the making of any Claim or the existence of any dispute regarding any Claim, unless otherwise directed by City’s Representative, Contractor shall not cause any delay, cessation, or termination in or of Contractor’s performance of the Work, but shall diligently proceed with performance of the Work in accordance with the Contract Documents.
Contractor shall submit a Claim in writing, together with all supporting data specified in this Section, to City’s Representative as soon as possible but not later than 30 days after the date the Claim arises under Sections 6 and 7 of the General and Supplemental Conditions.
7.7 Dispute Resolution
All claims by Contractor for a time extension, payment of money or damages arising from work done by, or on behalf of, Contractor pursuant to the Contract and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to, or as to the amount of payment which is disputed by the City of Three Hundred Seventy Five Thousand Dollars ($375,000) or less shall be subject to the provisions set forth in Public Contract Code Section 20104, et. seq. Those sections require that the claim be in writing, include the documents necessary to substantiate the claim, and be filed on or before the final date of EXHIBIT 1 987
payment, subject to all time limits and notice requirements for filing claims under the Contract.
In the event of any dispute of any amount between the parties asto performance of the work, the interpretation of the Contract or payment or nonpayment for work performed or not performed, the parties shall attempt to resolve the dispute informally. Contractor shall conduct such informal dispute negotiations only with designated City employees. If the parties are unable to resolve the dispute informally, either party can give written notice that it elects to proceed with mediation under the Construction Mediation Rules of the American Arbitration Association. Completion of such mediation is a condition precedent to the filing of any action other than one for injunctive relief or if a statute of limitations may expire.
Pending resolution of the dispute, Contractor agrees to continue its work and/or disputed work diligently to completion. If the dispute is not resolved, Contractor agrees it will neither rescind the Contract nor stop the progress of the work and/or the disputed work, but Contractor’s sole remedy shall be to submit such controversy to determination by a court of the State of California, in San Joaquin County, having competent jurisdiction of the dispute.
8.0 PAYMENT
8.1 Scope of Payment
8.1.1 General - The Contractor shall accept the compensation, as herein provided, as full payment for furnishing all labor, materials, tools, equipment, and incidentals necessary for completing the Work according to the Contract Documents, and no additional compensation will be allowed therefor. Neither the payment of any partial payment estimate nor of any retained percentage shall relieve the Contractor of any obligation to make good any defective work or material.
8.1.2 Payment for Patents and Patent Infringement - All fees or claims for any patented invention, article, or arrangement that may be used upon, or in any manner connected with, the performance of the work or any part thereof shall be included in the price for doing the work, and the Contractor and its sureties shall defend, protect, and hold the City and the City Representative together with all their officers, agents, and employees harmless against liability of any nature or kind for any and all costs, legal expenses, and damages made for such fees or claims and against any and all suits and claims brought or made by the holder of any invention or patent, or on account of any patented or unpatented invention, process, article, or appliance manufactured for or used in the performance of the Contract, including its use by the City, unless otherwise specifically stipulated in the Contract. Before final payment is made on the Contract, the Contractor shall furnish an affidavit to the City regarding patent rights for the project. The affidavit shall state that all fees and payments due as a result of the work incorporated into the project or methods utilized during construction have been paid in full. The Contractor shall certify in the affidavit that no other fees or claims exist for work in this project.
8.1.3 Payment of Taxes - The Contractor shall pay and shall assume exclusive liability for all taxes levied or assessed on or in connection with the Contractor's performance of this Contract, including, but not limited to, State and local sales and use taxes, Federal and State payroll taxes or assessments, and excise taxes, and no separate allowance will be made therefor, and all costs in connection therewith shall be included in the total amount of the Contract GMP.
EXHIBIT 1 988
8.1.4 Payment for Labor and Materials - The Contractor shall pay and require its subcontractors to pay any and all accounts for labor including worker's compensation premiums, state unemployment and federal social security payments and other wage and salary deductions required by law. The Contractor also shall pay and cause its subcontractors to pay any and all accounts for services, equipment, and materials used by the Contractor and its subcontractors during the performance of work under this Contract. Such accounts shall be paid as they become due and payable. If requested by the City, the Contractor shall furnish proof of payment of such accounts to the City.
8.2 Partial Payments
In consideration of the faithful performance of the work prosecuted in accordance with the provisions of these Specifications and the Contract, the City will pay the Contractor for all such work installed on the basis of the Cost of the Work for completed Work, as defined in Exhibit Q, GUARANTEED MAXIMUM PRICE.
Payments will be made by the City to the Contractor based on the documented Cost of the Work during the preceding payment period
Partial payments will be made monthly based on work accomplished as of a day mutually agreed between the City and the Contractor.
The Contractor shall submit documentation of performed during the payment period in a format acceptable to the City Representative and corresponding to the accepted cost breakdown (Application for Payment). Upon receipt of Contractor's Application for Payment, the City shall act in accordance with the following:
a. The City Representative shall review the submitted documentation, as soon as practicable after receipt, for the purpose of determining that the documented Cost of the Work completed comprises a proper request for payment. Contractor shall assist and facilitate the City Representative’s review, consistent with an open book review of all costs, and shall provide additional detail or documentation reasonably required to perform a detailed review of costs. Contractor shall make available Contractor’s internal project-related cost control records in electronic format such that City’s Representative has the ability to conduct a complete review of the basis of the Application for Payment.
b. Any request for payment determined not to be a proper payment request suitable for payment shall be returned to the Contractor as soon as practicable, but not later than seven (7) days after receipt. A request for payment returned pursuant to this paragraph shall be accompanied by a document setting forth in writing the reasons why the request for payment is not proper.
c. The number of days available to the City to make a payment without incurring interest pursuant to this section shall be reduced by the number of days by which the City exceeds the seven (7) day return requirement set forth in subdivision (b) above.
Payment will be made by the City to the Contractor in accordance with City's normal accounts payable procedures; the City shall retain amounts in accordance with Paragraph 00700-8.4, Right to Withhold Amounts.
EXHIBIT 1 989
No such payment shall be required to be made, when in the judgment of the City Representative, the Work is not proceeding in accordance with the provisions of the Contract, or when in the City Representative's judgment the total value of the Work done since the last estimate amounts to less than One Thousand Dollars ($1,000.00).
Additionally, no payments shall be made until the City Representative has received an acceptable monthly schedule update covering the latest required period, certified payrolls and other required pay records, and a conditional waiver and release upon progress payment for the prior progress payment period. The City reserves the right to require, as a condition precedent to payment, that Contractor provide conditional and unconditional waivers and releases from Contractor’s subcontractors and suppliers.
Subject to the provisions of this section, the City shall pay the Contractor within thirty (30) days after receipt of undisputed and properly submitted requests for payment from the Contractor. In accordance with Public Contract Code, if the City fails to pay an undisputed request for payment within the allotted thirty (30) days, the City shall pay interest to the Contractor equivalent to the legal rate set forth in the Code of Civil Procedure.
8.3 Partial Payments - Inclusion of Materials on Hand
Materials, as used herein, shall be considered to be those items which are fabricated and manufactured goods and equipment. Only those materials for which the Contractor can transfer clear title to the City will be qualified for partial payment. The Contractor may request payment of seventy-five (75) percent of the actual net cost of these materials.
To receive partial payment for materials and equipment delivered to the Site, but not incorporated in the Work, it shall be necessary for the Contractor to submit to the Construction Manager a list of such materials, at least seven (7) days prior to submitting the monthly estimate of amount earned for work completed. At the Construction Manager's sole discretion, the Construction Manager will approve items for which partial payment is to be made subject to the following:
a. Only equipment or materials which have received favorable review of shop drawings will qualify.
b. Eligible equipment or materials must be delivered and properly stored, protected, and maintained in a manner favorably reviewed by the Construction Manager, at the job site or at a bonded warehouse.
c. The Contractor's actual net cost for the materials must be supported by paid invoices of suppliers, or other documentation requested by the Construction Manager. d. Materials or equipment delivered to the Site less than thirty (30) days prior to their scheduled incorporation in the Work shall not qualify.
e. Final payment shall be made only for materials actually incorporated in the Work.
Upon acceptance of the Work, all materials remaining for which advance payments had been made shall revert to the Contractor, unless otherwise agreed, and partial payments made for these items shall be deducted from the final payment for the Work.
EXHIBIT 1 990
f. Partial payments for materials and equipment on hand shall not be deemed to be final payment for the material nor relieve the Contractor of its obligations under the Contract.
g. Partial payments for materials and equipment on hand shall be subject to retention in accordance with Paragraph 00700-8.4., Right to Withhold Amounts.
8.4 Right to Withhold Amounts
8.4.1 Retention - The City will deduct from each partial payment and retain as part security, five (5) percent of the amount earned until the final payment.
Pursuant to Public Contract Code, for monies earned by the Contractor and withheld by the City to ensure the performance of the Contract, the Contractor, may, at his or her option, choose to substitute securities meeting the requirements of said Code. In the event the Contractor wishes to choose this option, the Contractor shall enter into an escrow agreement with the City, and the escrow agent, a qualified bank to be chosen by City, in the form of the agreement included in the project specifications. The costs of such escrow shall be paid by the Contractor. The securities to be deposited in said escrow account shall be equivalent, in fair market value, to the amount to be withheld as performance retention. The securities shall be held in accordance with the provisions of the Public Contract Code, and the implementing agreement.
Contractor shall have the obligation of ensuring that such securities deposited are sufficient so as to maintain, in total fair market value, an amount equal to the cash amount of the sums to be withheld under the Contract. If, upon written notice from the City, or from the appropriate escrow agent, indicating that the fair market value of the securities has dropped below the dollar amount of monies to be withheld by the City to ensure performance, Contractor shall, within five days of the date of such notice, post additional securities as necessary to ensure that the total fair market value of all such securities held by the City, or in escrow, is equivalent to the amount of money to be withheld by the City under the Contract.
Any Contractor wishing to exercise this option shall give notice in writing to City, and shall thereafter execute an escrow agreement in the following form:
EXHIBIT 1 991
ESCROW AGREEMENT FOR
SECURITY DEPOSITS IN LIEU OF RETENTION
This Escrow Agreement is made and entered into by and between; whose address is
hereinafter called "City", and
whose address is
hereinafter called "Contractor", and
whose address is
hereinafter called "Escrow Agent."
For the consideration hereinafter set forth, the City, Contractor, and Escrow Agent agree as follows:
1. Pursuant to the Public Contract Code of the State of California, Contractor has the option to deposit securities which meet the requirements set forth in said Code, with Escrow Agent, as a substitute for retention earnings required to be withheld by City pursuant to the Construction Contract entered into between City and Contractor for in the amount of
dated (hereinafter referred to as the "Contract"). Alternatively, on written request of the Contractor, the City shall make payments of the retention earnings directly to the Escrow Agent. When Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the City within 10 days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the City and Contractor. Securities shall be held in the name of City, and shall designate the Contractor as the beneficial owner.
2. City shall make progress payments to Contractor for such funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above.
3. When the City makes payment of retention earned directly to the Escrow Agent the Escrow Agent shall hold them for the benefit of the Contractor until such time as the escrow created under this Contract is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the City pays the Escrow Agent directly.
4. Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account, and all expenses of the City. These expenses and payment terms shall be determined by the City, Contractor, and Escrow Agent.
5. The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the City.
EXHIBIT 1 992
6. Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from City to the Escrow Agent that City consents to the withdrawal of the amount sought to be withdrawn by Contractor.
7. The City shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven days' written notice to the Escrow Agent from the City of the default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the City.
8. Upon receipt of written notification from the City certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges.
9. Escrow Agent shall rely on the written notifications from the City and the Contractor pursuant to Sections (4) to (6), inclusive, of this Agreement, and City and Contractor shall hold Escrow Agent harmless from Escrow Agent's release and disbursement of the securities and interest as set forth above.
10. The names of the persons who are authorized to give written notice or to receive written notice on behalf of the City and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:
On Behalf of City: On Behalf of Contractor:
Title Title
Name Name
Signature Signature
Address Address
EXHIBIT 1 993
On Behalf of Escrow Agent:
_______________________
Title
_______________________
Name
_______________________
Signature
______________________
Address
At the time the Escrow Account is opened, City and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement.
IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above.
CITY: CONTRACTOR:
________________________ ________________________
Title Title
________________________ ________________________
Name Name
________________________ ________________________
Signature Signature
EXHIBIT 1 994
8.4.2 Other Withholds - In addition to the amount which the City may otherwise retain under the Contract, the City may withhold a sufficient amount or amounts of any payment or payments otherwise due the Contractor, as in its judgment may be necessary to cover:
a. Payments which may be past due and payable for just claims against the Contractor or any subcontractor for labor or materials furnished for the performance of this Contract.
b. Defective work not remedied.
c. Failure of the Contractor to make proper payments to its subcontractors or suppliers. d. A reasonable doubt that the Contract can be completed for the balance then unpaid. e. Damage to another Contractor or third party, or to property. f. Failure of the Contractor to keep its work progressing in accordance with its progress schedule or maintaining current "As-Built" record drawings as required under Section 01300 SUBMITTALS.
g. The City's costs for the Contractor's failure to complete within the allowed time. h. Cost of insurance arranged by the City due to cancellation or reduction of the Contractor's insurance.
i. Failure of the Contractor to make proper submissions, as herein specified. j. Failure to submit, revise, resubmit, or otherwise conform to the requirements herein for preparing and maintaining a construction schedule.
k. Payments due the City from the Contractor.
l. Reduction of Contract Amount because of modifications. m. The Contractor's neglect or unsatisfactory prosecution of the work including failure to clean up.
n. Provisions of law that enable or require the City to withhold such payments in whole or in part.
When the above reasons for withhold amounts are removed, payment may be made to the Contractor for amounts withheld.
The City in its discretion may apply any withheld amount or amounts to the payment of valid claims. In so doing, the City shall be deemed the agent of the Contractor, and any payment so made by the City shall be considered as a payment made under the Contract by the City to the Contractor, and the City shall not be liable to the Contractor for such payment made in good faith. Such payments may be made without prior judicial determination of the claim or claims. The City will render to the Contractor a proper accounting of such funds disbursed in behalf of the Contractor.
8.5 RESERVED.
EXHIBIT 1 995
8.6 Substantial Completion
For Phase 1, “Substantial Completion” means the state in the progress of the Design Development Work where the design documents are at least at the 60-75% completion Phase, where the Design Development Documents are sufficiently developed to allow Contractor to prepare and provide to the City a Guaranteed Maximum Price (GMP) for the Phase 2 Work, and where the Contractor has submitted a price proposal in accordance with the requirements of this Contract or the City and Contractor have either negotiated and agreed to a Phase 2 GMP or City or Contractor mutually agree that they will not be able to agree to a Phase 2 price. “Substantial Completion” for Phase 2 means the Phase in the progress of the Construction Work, as determined by City’s Representative, when the Construction Work or a major portion or unit process of Construction Work is complete and in accordance with the Contract Documents except for completion of minor items which do not impair City’s ability to occupy and make beneficial use of the Construction Work for its intended purpose. Substantial Completion of all Construction Work will not be provided until the Project passes the Acceptance Test as described in Section 00500 Exhibit E Appendix C and, for buildings requiring a Building Permit, a Temporary Certificate of Occupancy has been issued by the City’s Building Official. The criteria for the Acceptance Test will be developed and agreed to by the City and Contractor during Phase 1, and, will meet the standards and requirements set forth in the Performance Requirements in Section 00500.
When Contractor gives notice to City’s Representative that the Construction Work or major portions of the Construction Work are substantially complete, unless City’s Representative determines that the Construction Work is not sufficiently complete to warrant an inspection to determine Substantial Completion, City’s Representative will inspect the Construction Work, and prepare and give to Contractor a comprehensive list of items to be completed or corrected before establishing Substantial Completion in accordance with Section 01700 – Contract Closeout. Contractor shall proceed promptly to complete and correct items on the list. Failure to include an item on such list does not alter the responsibility of Contractor to complete all Construction Work in accordance with the Contract Documents. City’s Representative will make an inspection to determine whether the Construction Work is substantially complete. If City’s Representative’s inspection discloses any item, whether or not included on the list, which must be completed or corrected before Substantial Completion, Contractor shall, before issuance of the Certificate of Substantial Completion, complete or correct such item. Contractor shall then submit a request for another inspection by City’s Representative to determine Substantial Completion.
When City’s Representative determines that the Construction Work is substantially complete, City’s Representative will arrange for inspection by City’s Building Official and other officials, as appropriate, for the purpose of issuing a Certificate of Occupancy or Temporary Certificate of Occupancy. After a Certificate of Occupancy or Temporary Certificate of Occupancy has been issued by the City’s Building Official, the City’s Representative will prepare a Certificate of Substantial Completion on City’s form as contained in the Exhibits, which, when signed by City, shall establish the date of Substantial Completion and the responsibilities of City and Contractor for security, maintenance, utilities, insurance, and damage to the Construction Work.
8.7 Acceptance
The Project (excepting buildingsfor which a Certificate of Occupancy is required) must pass an Acceptance Test for Substantial Completion of the Facilities as part of and as a condition for Final Completion of the Facilities. The Contractor shall conduct the Acceptance Test EXHIBIT 1 996
after certifying to the City that Contractor is ready for the test, and Contractor is in compliance with the applicable terms of the Contract. Readiness means that the Facilities can treat groundwater in compliance the terms of the Contract including the performance requirements (i.e., all necessary equipment is operable, including a complete, tested, accepted by the City and operable SCADA system, and the equipment manufacturers have certified that the equipment was installed properly and tested successfully in accordance with manufacturer recommendations).
Contractor shall perform all Acceptance Testing for the Facilities and prepare and submit an Acceptance Test report. City will not accept the Facilities until Contractor furnishes an acceptable Acceptance Test report.
8.8 Facilities Startup and Testing
In preparation for the Facilities startup and Acceptance Test, Contractor shall provide sufficient training of the City designated and licensed O&M workforce to explain the Facilities design intent, the O&M Manual and the equipment manufacturers’ recommendations. The City then will operate and maintain the Facilities during the Acceptance Test and thereafter in accordance with the design intent (including the parameters and operating conditions set forth in the Basis of Design Report), the Vendor O&M Manuals, the Operations Manual, Maintenance Manual and the equipment manufacturers’ recommendations. Contractor also shall provide:
(a) Operations Manual (prepared by design engineer)
(b) Complete Vendor O&M Manual
(c) CMMS information integrated with the O&M manual
(d) Spare parts inventory in accordance with the Contract Documents.
8.9 Final Completion and Final Payment
Upon completion of the Work, and upon completion of final cleaning, the Contractor shall so notify the Construction Manager in writing. Upon receipt of the notification, the Construction Manager, the City and/or their authorized representatives will make the final inspection, to determine the actual status of the Work in accordance with the terms of the Contract. If materials, equipment, or workmanship are found which do not meet the terms of the Contract, the Construction Manager shall prepare a punch list of such items and submit it to the Contractor. Following completion of the corrective work by the Contractor, the Construction Manager shall notify the City that the Work, has been completed in accordance with the Contract. Final determination of the acceptability of the Work shall be made by the City. After completion of the work, but prior to its acceptance by the City, the last partial payment will be made to the Contractor in accordance with Paragraph 00700-8.2, Partial Payments.
After receipt of the last partial payment, but prior to acceptance of the Work by the City, the Contractor shall send a letter to the Construction Manager. The letter shall state that acceptance of the final payment described below shall operate as and shall be, a release to the City, the Construction Manager, the Design Consultant, and their duly authorized agents, from all claims of and/or liability to the Contract arising by virtue of the Contract related to those amounts. Disputed Contract claims in stated amounts previously filed, as provided in EXHIBIT 1 997
Paragraph 00700-7.5, may be specifically excluded by the Contractor from the operation of the release.
Neither final payment nor any retention shall become due until Contractor submits the following items to Construction Manager:
a. The final Application For Payment and all submittals required in accordance with the General Conditions.
b. All guarantees and warranties procured by Contractor from subcontractors, all operation and maintenance manuals for equipment installed in the Project, as-built documents, and all other submittals required by the Contract Documents. c. Unconditional waivers and releases upon final payment from all subcontractors and suppliers and a conditional waiver and release upon final payment from Contractor. d. Certified payroll records and all other pay records as determined by the City.
Following receipt of all required submittals and the Construction Manager's written statement that construction is complete and recommendation that the City accept the project, the City will take formal action on acceptance.
Within ten (10) days of the acceptance by the City of the completed work embraced in the Contract, the City will cause to be recorded in the office of the County Recorder a Notice of Completion.
Thirty-five (35) days after recording the Notice of Completion of the work involved in the Contract, the City will pay the Contractor in lawful money such sums of money as may be due the Contractor including all sums retained but excluding such sums as have previously been paid the Contractor. This payment will constitute the final payment to the Contractor under this Contract.
8.10 Warranty of Title
No material, supplies, or equipment for the work under this Contract shall be purchased subject to any chattel mortgage, security agreement, or under a conditional sale or other agreement by which an interest therein or any part thereof is retained by the seller or supplier. The Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the work and agrees upon completion of all work to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by the Contractor, to the City free from any claim, liens, security interest, or charges, and further agrees that neither the Contractor nor any person, firm, or corporation furnishing any materials or labor for any work covered by this Contract shall have any right to a lien upon the premises or any improvement or appurtenances thereon.
9.0 EXISTING UTILITIES
9.1 General
EXHIBIT 1 998
Pursuant to Government Code Section 4216, et. seq., the Contractor shall notify the appropriate notification center, U.S.A., 1-800-642-2444.
9.2 Notification and Location
At least two (2) working days before performing any excavation work, the Contractor shall request the utility owners to mark or otherwise indicate the location of their service.
It shall be the Contractor's responsibility to determine the exact location and depth of all utilities, including service connections, which have been marked by the respective owners and which the Contractor believes may affect or be affected by the Contractor's operations.
Full compensation for such work shall be included in the Cost of the Work.
9.3 Damage and Protection
The Contractor shall immediately notify the City Representative and utility owner of any damage to a utility.
For work within a public right of way or utility easement, the Contractor is responsible for the cost of repairing and/or relocating damaged utilities subject to the provisions of Section 00700 7.3.
9.4 Utility Relocation and Rearrangement
The right is reserved to the City and the owners of utilities or their authorized agents to enter upon the Work area for the purpose of making such changes as are necessary for the rearrangement of their facilities or for making necessary connections or repairs to their properties. The Contractor shall cooperate with forces engaged in such work and shall conduct its operations in such a manner as to avoid any unnecessary delay or hindrance to the work being performed by such forces and shall allow the respective utilities time to relocate their facility. The Contractor assumes responsibility for the removal, relocation, or protection of existing facilities wherein said facilities are identified by the Plans, field located by a utility company, or as provided for in the General Requirements. The Contractor shall coordinate with the owner of utility facilities for the rearrangement of said facilities.
In the event that underground utilities are found that are not shown in the Contract Documents or are found to exist in a different location than shown in the Contract Documents, the Contractor shall: (1) notify the City Representative of the existence of said facilities immediately; and (2) take steps to ascertain the exact location of all underground facilities prior to doing work that may damage such facilities.
Requests for extensions of time arising out of utility rearrangement delays shall be determined by City Representative. In accordance with Government Code Section 4215 the Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay is caused by the failure of the City or utility company to provide for the removal or relocation of facilities for which they are the responsible party as defined in Paragraph 00700-9.3, Damage and Protection.
EXHIBIT 1 999
Where it is determined by the City Representative that the rearrangement of an underground main, the existence of which is not shown on the Plans, Specifications, or in the General Requirements, is essential in order to accommodate the contemplated improvement, the City Representative will provide for the rearrangement of such facility by other forces or by the Contractor in accordance with the provisions of Paragraph 00700-7.2, Change Orders.
When the General Requirements, Specifications, or Plans indicate that a utility is to be relocated, altered or constructed by others, the City will conduct all negotiations with the utility company and the work will be done at no cost to the Contractor.
Temporary or permanent relocation or alteration of utilities desired by the Contractor for its own convenience shall be the Contractor'sresponsibility and it shall make arrangements and bear all costs.
10.0 NOT USED
11.0 APPLICABLE LAW/CODE REQUIREMENTS
Contractor shall perform the Work in accordance with the following Applicable Law/Code Requirements and all code requirements reasonably anticipated to complete the work:
(a) All laws, statutes, the most recent building codes, ordinances, rules, regulations, and lawful orders of all public authorities having jurisdiction over City, Contractor, any Subcontractor, the Project, the Project site, the Work, or the prosecution of the Work, including, but not limited to:
(1) any federal, state or local law, code, regulation or consent order or agreement having the force of law;
(2) any formally adopted and generally applicable rule, requirement, determination, standard, policy, implementation schedule or order of any governmental or regulatory agency having appropriate jurisdiction; (3) any established interpretation of law or regulation utilized by an appropriate governmental or regulatory agency if such interpretation is documented by such governmental or regulatory agency and generally applicable; and,
(4) any governmental or regulatory agency approval, in each case applicable from time to time:
(a) to the siting, permitting, design, acquisition, construction, equipping, financing, ownership, possession, start-up, testing, operation, maintenance, repair, replacement or management of the Facilities; and
(b) to the supply, treatment or delivery of finished water. (b) Applicable sections in the State of California Labor Code. (c) All Applicable Code Requirements relating to nondiscrimination, payment of prevailing wages, payroll records, apprentices, and work day.
Contractor shall comply with and give notices required by all Applicable Code Requirements, including all environmental laws and all notice requirements under the Safe Drinking Water and Toxic Enforcement Act of 1986 (State of California Health and Safety Code Section 25249.5, and applicable sections that follow). Contractor shall promptly notify EXHIBIT 1 1000
City’s Representative in writing if Contractor becomes aware during the performance of the Work that the Contract Documents are at variance with Applicable Code Requirements.
If Contractor performs Work which it knows or should know is contrary to Applicable Code Requirements, without prior notice to City and City’s Representative, Contractor shall be responsible for such Work and any resulting damages including, without limitation, the costs of correcting Defective Work.
For Phase 1, the Applicable Code Requirements under this section shall be those in existence at the time the Contract is approved by the City Council. For Phases 2, the Applicable Code Requirements under this section shall be those in existence at the time the contract amendment for Phases 2 are approved by the City Council. Any change in the Applicable Code Requirements that occurs after approval of the Phase 1 Contract and/or Phase 2 contract amendments by the City Council, and that changes the scope, time, or cost of work in the respective Phases, shall be addressed through the change order and modifications procedures established in the Contract Documents.
12.0 USE OF SITE AND CLEAN UP
Contractor shall confine operations at the Project site to areas permitted by law, ordinances, permits, and the Contract Documents. Contractor shall not unreasonably encumber the Project site with materials or equipment.
Contractor shall, during performance of the Work, keep the Project site and surrounding area free from the accumulation of excess dirt, waste materials, and rubbish caused by Contractor.
Contractor shall remove all excess dirt, waste material, and rubbish caused by the Contractor; tools; equipment; machinery; and surplus materials from the Project site and surrounding area at the completion of the Work.
Personnel of Contractor and Subcontractors shall not occupy, live upon, or otherwise make use of the Project site during any time that Work is not being performed at the Project site, except as otherwise provided in the Contract Documents.
Contractor shall conduct and cause all working forces at the site to maintain the site in a neat orderly manner throughout the construction operations. The work shall be conducted in a manner that will control the dust. When ordered to provide dust control, the Contractor shall use water or turn soil to reduce the dusty conditions, all to the satisfaction of the City’s Representative. During construction, Contractor shall remove all rubbish and debris as it is generated to the satisfaction of the City’s Representative.
13.0 UNCOVERING AND CORRECTION OF CONSTRUCTION
If a portion of the Construction Work is covered contrary to City’s Representative’s request or direction, or contrary to the requirements of the Contract Documents, it must, if required in writing by City’s Representative, be uncovered for City’s Representative’s observation and be replaced at Contractor’s expense without adjustment of the Contract Time or the GMP.
If a portion of the Construction Work has been covered, which is not required by the Contract Documents to be observed or inspected prior to its being covered and which City’s Representative has not specifically requested to observe prior to its being covered, City’s Representative may request to see such Construction Work and it shall be uncovered and replaced by Contractor. If such Construction Work is in accordance with the Contract Documents, the costs of uncovering and replacing the Construction Work shall be added to EXHIBIT 1 1001
the GMP by Change Order; and if the uncovering and replacing of the Construction Work extends the Contract Time, an appropriate adjustment of the Contract Time shall be made by Change Order. If such Construction Work is not in accordance with the Contract Documents, Contractor shall pay such costs and shall not be entitled to an adjustment of the Contract Time or the GMP.
14.0 GUARANTEE
The Contractor shall guarantee that the equipment, materials and workmanship furnished under this Contract will be as specified and will be free from defects for a one-year guarantee period, starting from the date of Substantial Completion of the Work for Phase 2 or major portion or unit process thereof, unless a longer period of time is prescribed by law or required by special provisions elsewhere in the Contract Documents and except as otherwise noted herein. If a specific item (or items) of equipment or material cannot be utilized by the City at Substantial Completion of Phase 2 because the Work is incomplete or defective, the guarantee for that item (or items) shall begin when the City is provided beneficial use.
The cost of all materials, parts, labor, transportation, supervision, special tools and supplies required for correction of defects, failure or abnormalitiesshall be paid by the Contractor. In the event warranty work involves repair or replacement of parts, machine work, or any other work which affects the equipment or materials installed under this Contract, the Contractor’s guarantee on such items and work shall be extended for a period of one year from the date of installation of said items, or the performance of said work.
15.0 CORRECTION OF DEFECTIVE WORK AND GUARANTEE TO REPAIR PERIOD The term “Guarantee To Repair Period” means a period of 1 year from Substantial Completion, unless a longer period of time is specified.
Contractor shall (1) correct Defective Work that becomes apparent during the progress of the Work or during the Guarantee To Repair Period, and (2) replace, repair, or restore to City’s satisfaction any other parts of the Work and any other real or personal property which is damaged or destroyed as a result of Defective Work or the correction of Defective Work.
Contractor shall promptly commence such correction, replacement, repair, or restoration upon notice from City’s Representative or City, but in no case later than 10 days after receipt of such notice; and Contractor shall diligently and continuously prosecute such correction to completion. Contractor shall bear all costs of such correction, replacement, repair, or restoration, and all losses (subject to provisions of this Contract limiting the extent of such losses) resulting from such Defective Work, including additional testing, inspection, and compensation for City’s Representative’s services and expenses. Contractor shall perform corrective Work at such times that are acceptable to City and in such a manner as to avoid, to the extent practicable, disruption to City’s activities.
If immediate correction of Defective Work is required for life safety or the protection of property and is performed by City or Separate Contractors, Contractor shall pay to City all reasonable costs of correcting such Defective Work. Contractor shall replace, repair, or restore to City’s satisfaction any other parts of the Construction Work and any other real or personal property which is damaged or destroyed as a result of such Defective Work or the correction of such Defective Work.
Contractor shall remove from the Project site portions of the Construction Work and materials which are not in accordance with the Contract Documents and which are neither corrected by Contractor nor accepted by City.
EXHIBIT 1 1002
If Contractor fails to commence correction of Defective Work within 10 days after notice from City or City’s Representative or fails to diligently prosecute such correction to completion, City may correct the Defective Work; and, in addition, City may remove the Defective Work and store salvageable materials and equipment at Contractor’s expense.
If Contractor fails to pay the costs of such removal and storage as required by the Contract Documents within 10 days after written demand, City may, without prejudice to other remedies, sell such materials at auction or at private sale, or otherwise dispose of such material. Contractor shall be entitled to the proceeds of such sale, if any, in excess of the costs and damages for which Contractor is liable to City, including compensation for City’s Representative’s services and expenses. If such proceeds of sale do not cover costs and damages for which Contractor is liable to City, the GMP shall be reduced by such deficiency. If there are no remaining payments due Contractor or the remaining payments are insufficient to cover such deficiency, Contractor shall promptly pay the difference to City.
Contractor’s obligations under this clause are in addition to, and not in limitation of, its warranty under clause 14.0 of this Section, or any other obligation of Contractor under the Contract Documents. Enforcement of Contractor’s express warranties and guarantees to repair contained in the Contract Documents shall be in addition to and not in limitation of any other rights or remedies City may have under the Contract Documents or at law or in equity for Defective Work, including, but not limited to, under CCP sections 337.1 and 337.15. Nothing contained in this Section shall be construed to establish a period of limitation with respect to other obligations of Contractor under the Contract Documents.
Establishment of the Guarantee To Repair Period relates only to the specific obligation of Contractor to correct the Work and in no way limits either Contractor’s liability for Defective Work or the time within which proceedings may be commenced to enforce Contractor’s obligations under the Contract Documents.
16.0 CORRECTION OF PATENT DEFECTS OR LATENT DEFECTS AFTER EXPIRATION OF GUARANTEE PERIOD:
Should the City discover any patent defects or latent defects with regard to Contractor's Work after the expiration of the applicable guarantee period, the City will endeavor to provide written notice to Contractor to provide Contractor an opportunity to investigate the condition. Should the City determine that a legal proceeding must be initiated to recover its damages caused by the patent or latent defect, The City's recovery shall be as permitted under California law. Nothing herein is intended to affect any defenses Contractor may have to the City’s legal claims.
*** END OF SECTION ***
EXHIBIT 1 1003
SECTION 00800 - SUPPLEMENTAL CONDITIONS
1.0 LOCAL EMPLOYMENT (For contracts valued at $100,000 and above) Contractor shall make a good-faith effort, with the assistance of local labor union hiring halls or community organizations designated by the City to employ qualified individuals who are, and have been for one year prior to the effective date of the contract, residents of Stockton in sufficient numbers so that no less than 50% of the contractor's total construction work force, including any subcontractor work force, measured in labor work hours, is comprised of Stockton residents.
Contractor or subcontractor shall make a good faith effort to employ apprentices who are enrolled in and participating in a viable apprenticeship program serving the San Joaquin Valley and approved by the State Department of Apprenticeship Standards. This apprenticeship requirement shall apply for each apprenticable craft or trade in which the contractor employs workers in performing any of the work under the contract.
If, in response to a written request made at least 48 hours (excluding Saturdays, Sundays and holidays) before the date on which one or more apprentices are required, an apprenticeship program(s) does not dispatch any apprentice or dispatches fewer apprentices than requested to a contractor (that has agreed to employ and train apprentices in accordance with California Labor Code Section 1777.5) within 72 hours of such request (excluding Saturdays, Sundays and holidays), that contractor shall be considered in compliance with the apprentice employment requirement for that trade or craft for a 90-day period from the request date, provided the contractor employs those apprentices who are dispatched. Where there is more than one viable apprenticeship program for that trade or craft serving the San Joaquin Valley, a contractor, that is not a participant in or an affiliate of an apprenticeship program and receives fewer apprentices dispatched than requested, shall not be considered in compliance with the apprentice employment requirement unless the contractor has made a written request for the dispatch of apprentices from at least two viable apprenticeship programs. A contractor, that is a participant in or an affiliate of an apprenticeship program, shall make dispatch requests to the program in which it is affiliated or participating.
In the event that no viable apprenticeship program exists for a particular craft or trade, the contractor shall be exempt from the requirements of this Section with regard to that craft or trade.
A contractor employing apprentices pursuant to this Section shall employ apprentices in a ratio of not less than one apprentice for each five journeymen in the apprenticeship craft or trade classification that are employed on the public work contract unless to do so would result in apprentice employment in ratios below the minimum ratios prescribed by California Labor Code Section 1777.5 in which case apprentice employment shall be at least in the ratios prescribed by California Labor Code Section 1777.5.
This Section shall not be construed so as to exempt a contractor from any otherwise applicable requirement imposed upon the contractor by the California Labor Code.
EXHIBIT 1 1004
1.1 GOOD FAITH EFFORT
A bidder or contractor who fails to meet the goal of having 50 percent of its work force be residents of Stockton shall, nevertheless, be deemed to have made a "good faith effort" to hire sufficient numbers of residents of Stockton if, prior to execution of the contract with the City, six (6) or more of the following employee recruitment activities have been undertaken and documented:
(A) Placing a valid job order for existing and projected position vacancies with the local office of the State Employment Development Department, for no less than 10 consecutive calendar days.
(B) Placing a valid job order for existing and projected position vacancies with Worknet of San Joaquin County, for no less than 10 consecutive calendar days. (C) Advertising existing and projected position vacancies, job informational meetings, job application workshops, job application centers and job interviews by posting notices which identify the positions to be filled, the qualifications required, and where to obtain additional information about the application process, in conspicuous local authorized public places, including but not limited to the City Hall, schools, post offices, libraries, and senior citizens' centers.
(D) Conducting a job informational meeting to inform the community of employment opportunities of the contractor, to be held at a City or other public facility (may be combined with other contractors).
(E) Providing ongoing assistance to Stockton residents in completing job application forms. (F) Conducting a job application workshop to assist the community in applying and interviewing for jobs in the contracting industry, to be held at a City or other public facility (may be combined with other contractors).
(G) Establishing a job application center located in the City of Stockton, where job applications may be obtained, delivered to and collected. (H) Conducting job interviews within 10 miles of the location designated for contract performance.
(I) Advertising valid existing and projected position vacancies through the local media, such as community television network, local newspapers of general circulation, and trade papers or minority focus newspapers.
(J) Telephone solicitation of known potential local subcontractors or employees. (K) Any other means of obtaining employees who are residents of Stockton that are reasonably calculated to comply with the goals of this ordinance.
1.2 REQUIRED DOCUMENTATION
EXHIBIT 1 1005
The contractor shall keep, and provide to the City, on standardized forms acceptable to the City, an accurate record showing the name, place of residence, hours employed and per diem wages and benefits of each person employed by the contractor, and the contractor's subcontractors, on the specific public works project, including full-time, part-time, permanent and temporary employees.
The contractor shall keep, and provide to the City, on forms acceptable to the City, an accurate record, documenting the contractor's good faith efforts to comply with the local resident employment and apprentice employment provisions of this Section. Said records shall include: a listing by name and address of all local recruitment sources contacted by the contractor; the date of the local recruitment contact and the identity of the person contacted; the trade and classification and number of employment referrals requested; the number of local residents employed as a result of the contact; and the identity and address of the person(s) employed pursuant to the contact.
1.3 FORMS SUBMITTED UNDER PENALTY OF PERJURY
All forms required under this Section shall attest to the veracity of the information set forth therein and shall be submitted under penalty of perjury.
1.4 IRRESPONSIBLE BIDDER DECLARATION
Should any contractor or subcontractor fail to abide by the good-faith local resident employment and apprentice employment provisions of this Section, the contractor or subcontractor may be declared by the City to be an irresponsible bidder on future projects pursuant to Section 3.72.010 of this Code.
1.5 BINDING ON SUBCONTRACTORS
The good-faith local resident employment and apprentice employment provisions of this Section shall bind the contractor both with respect to persons employed directly by the contractor and to all persons employed by the contractor's subcontractors. The contractor shall be responsible for assuring that all subcontractors document said compliance by submitting, and making available to the City, the forms required by this Section.
1.6 DEFINITIONS
As used in this Section, the following terms shall have the following definitions:
(A) "Qualified individual" means an individual who is in a certified state or federally approved apprenticeship program in an applicable trade or has become a journeyperson in his or her applicable trade.
(B) "Contract for public works or improvement" means any contract with the City for construction, alteration, demolition or repair work.
EXHIBIT 1 1006
(C) "Resident of Stockton" means an individual who has been domiciled, as defined by Section 200(b) of the California Elections Code, within the boundaries of Stockton for at least one year immediately preceding the date of the award of contract by the City and who can verify his or her domicile upon request of the contractor or City by producing documentation such as a rent/lease agreement, telephone and utility bills or payment receipts, a valid California driver's license or identification card, and/or any other similar, reliable evidence that verifies that the individual is domiciled within Stockton.
For the purposes of this Section, the following Zip Code areas are considered to be within Stockton: 95202, 95203, 95204, 95205, 95206, 95207, 95209, 95210, 95212, 95215 and 95219.
(D) "Viable apprenticeship program" means an apprenticeship program approved by the California Department of Apprenticeship Standards that has graduated apprentices annually for at least the past five years. Any apprenticeship program that has been approved for less than ten years shall be deemed a viable apprenticeship program provided that, following the fifth anniversary of its approval by the California Department of Apprenticeship Standards, it graduates apprentices each subsequent year.
1.7 CONTRACTS - SUBCONTRACTS
Contracts and bid documents shall incorporate this Section by reference and shall provide that the failure of any contractor or subcontractor to comply with any of the requirements of this Section shall be deemed a material breach of the contract or subcontract.
All subcontracts shall expressly acknowledge the City's status as a third party beneficiary to that subcontract and further expressly acknowledge that the City, as a third party beneficiary, shall have the right to enforce the provisions of this Section with regard to that subcontract or seek remedies available under this Section should a party to the subcontract fail to comply with any of the provisions of this Section that apply to the subcontract. However, nothing set forth herein shall create a contractual relationship, or privity, between the City and any subcontractor.
Bidders or contractors and subcontractors shall maintain records necessary for monitoring their compliance with this Section.
1.8 EXCEPTIONS
The provisions of this Section shall not apply:
(A) Where the City determines that the contract is necessary to respond to a declared emergency which endangers the publish health, welfare, or safety and there is no time to apply the provisions of this Section.
To City construction contracts or portions thereof, wherein the work is of a highly specialized nature as determined by the City Council when the contract specifications are approved (Ord. 011-09 § 1, eff. 10- 01-09).
EXHIBIT 1 1007
LOCAL EMPLOYMENT ORDINANCE
COMPLIANCE DOCUMENTATION
Final Report
For
PROJECT NAME
PROJECT NO.
CITY OF STOCKTON
MUNICIPAL UTILITIES DEPARTMENT
Notice to Proceed:
Date
EXHIBIT 1 1008
General Information
The Prime Contractor and every subcontractor shall complete this page and the accompanying forms no later than 30 days after Substantial Completion of the Project.
Project Name:
Project Number:
Contract Date:
Contractor:
Address:
City: STATE: ZIP:
Phone:
Contractor’s License Number:
Type of Contractor’s License (s):
EXHIBIT 1 1009
SUMMARY SHEET FOR LOCAL RESIDENT PARTICIPATION
List the actual number of hours performed in Table 1
TABLE 1
ITEM DESCRIPTION HOURS TO DATE
A Total number of hours performed at the jobsite
B Qualifying number of labor hours performed at the jobsite
Qualifying hours are defined as hours performed by Local Residents.
Percent local participation: B/A x 100 =
EXHIBIT 1 1010
SUMMARY SHEET FOR APPRENTICESHIP REQUIREMENT
TABLE 2
Trade/
Classification
Number of
Journeymen
Number of
Apprentices
EXHIBIT 1 1011
BREAKDOWN OF WORK HOURS PERFORMED AT THE JOBSITE
TABLE 3
Employee
Name *
Zip Code
of
Residenc
e
Local
Resident
Yes/No
Meets one
year
Residency
Requireme
nt
Yes/No
Hours
Employe
d
Base
Hourly
Pay
Total
Hourly
Pay
If apprentice, please indicate with an asterisk (*)
Please provide supporting documentation for proof of residence and one year residency requirement.
EXHIBIT 1 1012
GOOD FAITH EFFORT DOCUMENTATION
CITY OF STOCKTON
MUNICIPAL UTILITIES DEPARTMENT
Please check all boxes that apply:
Placed a valid job order for existing and projected position vacancies with the local office of the State Employment Development Department, for no less than 10 consecutive calendar days.
Placed a valid job order for existing and projected position vacancies with Worknet of San Joaquin County, for no less than 10 consecutive calendar days.
Advertised existing and projected position vacancies, job informational meetings, job application workshops, job application centers and job interviews by posting notices which identify the positions to be filled, the qualifications required, and where to obtain additional information about the application process, in conspicuous local authorized public places, including but not limited to the City Hall, schools, post offices, libraries, and senior citizens’ centers.
Conducted a job informational meeting to inform the community of employment opportunities of the contractor, to be held at a City facility (may be combined with other contractors).
Provided ongoing assistance to Stockton residents in completing job application forms.
Conducted a job application workshop to assist the community in applying and interviewing for jobs in the contracting industry, to be held at a City facility (may be combined with other contractors).
Established a job application center located in the City of Stockton, where job applications may be obtained, delivered to and collected.
Conducted job interviews within 10 miles of the location designated for contract performance.
Advertised valid existing and projected position vacancies through the local media, such as community television network, local newspapers of general circulation, and trade papers or minority focus newspapers.
Telephone solicitation of known potential local subcontractors or employees.
Any other means of obtaining employees who are residents of Stockton that are reasonably calculated to comply with the goals of this ordinance.
Please provide supporting documentation for all boxes checked.
EXHIBIT 1 1013
I declare under the penalty of perjury that the foregoing information is true and correct.
By my signature below, I acknowledge that I have met the requirements of the City of Stockton’s Local Employment Ordinance.
I understand this information is subject to audit verification, and I acknowledge and am hereby advised that upon, and as a result of, a finding of non-compliance with the Local Employment Ordinance Provisions, the City may determine that I and/or my firm is not a responsible bidder on future projects.
Owner/Authorized Representative (Signature) Name of Firm
Name and Title (Print) Date
EXHIBIT 1 1014
2.0 COMMUNITY WORKFORCE AND TRAINING AGREEMENT (For contracts valued at $1,000,000 and above)
EXHIBIT 1 1015
EXHIBIT 1 1016
EXHIBIT 1 1017
EXHIBIT 1 1018
EXHIBIT 1 1019
EXHIBIT 1 1020
EXHIBIT 1 1021
EXHIBIT 1 1022
EXHIBIT 1 1023
EXHIBIT 1 1024
EXHIBIT 1 1025
EXHIBIT 1 1026
EXHIBIT 1 1027
EXHIBIT 1 1028
EXHIBIT 1 1029
EXHIBIT 1 1030
EXHIBIT 1 1031
EXHIBIT 1 1032
EXHIBIT 1 1033
EXHIBIT 1 1034
EXHIBIT 1 1035
EXHIBIT 1 1036
INTENTIONALLY LEFT BLANK
EXHIBIT 1 1037
COMMUNITY WORKFORCE AND TRAINING AGREEMENT
COMPLIANCE DOCUMENTATION
Monthly Workforce Utilization Report
MM/DD/YYYY through MM/DD/YYYY
For
PROJECT NAME
PROJECT NO.
CITY OF STOCKTON
___________________ DEPARTMENT
EXHIBIT 1 1038
General Information
The Prime Contractor and every subcontractor shall complete this page and the accompanying forms to be submitted monthly.
Project Name:
Project Number:
Contract Date:
Contractor:
Address:
City: STATE: ZIP:
Phone:
Contractor’s License Number:
Type of Contractor’s License (s):
EXHIBIT 1 1039
SUMMARY SHEET FOR LOCAL WORKFORCE UTILIZATION
TABLE 1
ITEM DESCRIPTION HOURS
A Total hours performed at the jobsite (Σ2 +Σ3)
B Labor hours performed at the jobsite by Stockton Residents (Σ1) C Labor hours performed by Local Area (San Joaquin) Residents (Σ2) D Labor hours performed at the jobsite by Apprentices (Σ5 +Σ6) E Labor hours performed at the jobsite by Stockton Apprentices (Σ4) F Labor hours performed by Local Area (San Joaquin) Apprentices (Σ5) Local Hire Requirements:
B
Primary Goal = x 100%
A
= _________% must be equal to or greater than 50%
If the primary goal of 50% is not achieved, provide as an attachment, documentation showing any requests made to the Union dispatchers for Stockton residents and the Union’s response to the request.
C
Secondary Goal = x 100%
A
= _________% must be equal to or greater than 50%
State of California, Department of Industrial Relations, Division of Apprenticeship Standards Requirements:
D
x 100%
A
= _________% must be equal to 20%
Priority Apprenticeship and Workforce Development Requirements:
E
Primary Goal = x 100%
D
= _________% must be equal to or greater than 50%
If the primary goal of 50% is not achieved, provide as an attachment, documentation showing any requests made to the Union dispatchers for Stockton residents and the Union’s response to the request.
F
Secondary Goal = x 100%
D
= _________% must be equal to or greater than 50%
EXHIBIT 1 1040
BREAKDOWN OF WORK HOURS PERFORMED AT THE JOBSITE
TABLE 2
Employee
Name * Union
Zip Code
of
Residen
ce
Employee Residency
Stockton
Resident
S.J. County
(Local Area)
Resident
Neither
Check,
if Yes
Number of
Hours
Worked
Check,
if Yes
Number of
Hours
Worked
Check,
if Yes
Number of
Hours
Worked
TOTAL Σ1 Σ2 Σ3
If apprentice, please indicate with an asterisk (*)
Stockton Resident means a resident of the City of Stockton as defined by Stockton Municipal Code Section 3.68.095 (I) (3).
Local Area Resident means any Stockton Resident or any individual domiciled within the boundaries of San Joaquin County.
You may be required to provide supporting documentation for proof of residency.
Priority zip codes are: 95202, 95203, 95204, 95205, and 95206.
EXHIBIT 1 1041
BREAKDOWN OF WORK HOURS PERFORMED AT THE JOBSITE
BY APPRENTICES
TABLE 3
Trade/Classification
Number of
Journeyme
n Hours
Number of
Apprentic
es Hours
Apprentice Residency
Stockton
Resident
S.J. County
(Local Area)
Resident
Neither
Check,
if Yes
Number
of Hours
Worked
Check,
if Yes
Number of
Hours
Worked
Check,
if Yes
Number of
Hours
Worked
TOTAL Σ4 Σ5 Σ6
Stockton Resident means a resident of the City of Stockton as defined by Stockton Municipal Code Section 3.68.095(I)(3).
Local Area Resident means any Stockton Resident or any individual domiciled within the boundaries of San Joaquin County.
EXHIBIT 1 1042
I declare under the penalty of perjury that the foregoing information is true and correct.
By my signature below, I acknowledge that I have met the requirements of the City of Stockton’s Community Workforce and Training Agreement.
I understand this information is subject to audit verification, and I acknowledge and am hereby advised that upon, and as a result of, a finding of non-compliance with the Community Workforce and Training Agreement, the City may determine that I and/or my firm is not a responsible bidder on future projects.
Owner/Authorized Representative (Signature) Name of Firm
Name and Title (Print) Date
EXHIBIT 1 1043
3.0 Labor, Working Hours:
3.1 No Work shall be done between [6:00 p.m. and 7:00 a.m.] without permission of the City.
However, emergency work may be done without prior permission.
3.2. Night Work may be undertaken as a regular procedure with the permission of the City; such permission, however, may be revoked at any time by the City if Contractor fails to maintain adequate equipment and supervision for the proper prosecution and control of the Work at night.
4.0 Services, Materials, and Equipment:
A. Interfaces to Equipment, Instruments, and Other Components:
1. The drawings, specifications, and overall design are based on preliminary information furnished by various equipment manufacturers which identify a minimum scope of supply from the manufacturers. This information pertains to, but is not limited to, instruments, control devices, electrical equipment, packaged mechanical systems, and control equipment provided with mechanical systems.
2. Provide all material and labor needed to install the actual equipment furnished, and include all costs to add any additional conduit, wiring, terminals, or other electrical hardware to the work, which may be necessary to make a complete, functional installation based on the actual equipment furnished. Make all changes necessary to meet the manufacturer’s wiring requirements.
3. Submit all such changes and additions to the Construction Manager for acceptance in accordance with the General Conditions.
4. Review the complete set of drawings and specifications in order to ensure that all items related to the electrical power and control systems are completely accounted for. Include any such items that appear on drawings or in specifications from another discipline in the scope of Work.
B. Until Substantial Completion of the Work is acknowledged by the City, Contractor shall have the responsible charge and care of the Work and of materials to be used herein, including materials for which Contractor has received partial payment or materials which have been furnished by the City, and shall bear the risk of injury, loss, or damage to any part thereof by the action of the elements or from any other cause, whether arising from the execution or from the nonexecution of the Work.
C. Contractor shall rebuild, repair, restore, and make good all injuries, losses, or damages to any portion of the Work or the materials occasioned by any cause before the Work's completion and acceptance and shall bear the expense thereof. Where necessary to protect the Work or materials from damage, Contractor shall, at Contractor's own expense, provide suitable drainage and erect such temporary structures or rent such structures as are necessary to protect the Work or materials from damage. The suspension of the Work or the granting of an extension of time from any cause whatever shall not relieve Contractor of Contractor's responsibility for the Work and materials as specified herein.
EXHIBIT 1 1044
D. When the quality of a material, process, or article is not specifically set forth in the Contract Documents, the best available quality of the material, process, or article shall be provided.
E. Delivery and Inspection:
1. Deliver products in undamaged condition, in manufacturer’s original container or packaging with identifying labels intact and legible. Include date of manufacture on label. *** END OF SECTION ***
EXHIBIT 1 1045
SECTION 00820 - LIABILITY AND INSURANCE REQUIREMENTS
Contractor shall procure and maintain for the duration of the contract, and for five (5) years thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees, or subcontractors. In the event contractor fails to obtain or maintain completed operations coverage as required by this agreement, the City, at its sole discretion, may purchase the coverage required and the cost will be paid by the contractor.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
2. Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $2,000,000 per accident for bodily injury and property damage.
3. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
4. Surety Bonds as described below.
5. Professional Liability (Errors and Omissions) Insurance appropriate to the Contractor’s profession, with limit no less than $2,000,000 per occurrence or claim, $2,000,000 aggregate. (If Claims-made, see below.)
6. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
It shall be a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be available to the Additional Insured. Furthermore, the requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this Agreement; or (2) the broader coverage and maximum limits of coverage of any Insurance policy or proceeds available to the named insured; whichever is greater. No representation is made that the minimum insurance requirements of this agreement are sufficient to cover the obligations of the Contractor under this agreement.
Limits of Insurance
EXHIBIT 1 1046
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis before the City’s own insurance or self-insurance shall be called upon to protect it as a named insured.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
Additional Insured Status
The City of Stockton, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 if a later edition is used). Additional insured Name of Organization shall read “City of Stockton, its officers, officials, employees, and volunteers.” Policy shall cover City of Stockton, its officers, officials, employees, and volunteers for all locations work is done under this contract.
Primary Coverage
The Additional Insured coverage under the Contractor’s policy shall be “primary and noncontributory” and will not seek contribution from the City’s insurance or self-insurance and shall be at least as broad as CG 20 01 04 13. The City of Stockton does not accept endorsements limiting the Contractor’s insurance coverage to the sole negligence of the Named Insured.
Claims Made Policies – (Note – applicable only to professional and/or pollution liability) If any coverage required is written on a claims-made coverage form:
1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of contract work.
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.
4. A copy of the claims reporting requirements must be submitted to the City of Stockton for review.
EXHIBIT 1 1047
5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
Notice of Cancellation
Each insurance policy required above shall provide that coverage shall not be canceled, except with notice to the City of Stockton.
Waiver of Subrogation
Contractor hereby grants to City of Stockton a waiver of any right to subrogation which any insurer of said Contractor may acquire against the City of Stockton by virtue of the payment of any loss under such insurance. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City of Stockton has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City of Stockton for all work performed by the Contractor, its employees, agents and subcontractors.
Self-Insured Retentions
All Self-insured retentions must be disclosed to Risk Management for approval and shall not reduce the limits of liability. The City of Stockton may require the Contractor to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City of Stockton.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City of Stockton.
Verification of Coverage
Contractor shall furnish the City of Stockton with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City of Stockton Risk Services before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City of Stockton reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Contractor shall, prior to the commencement of work under this Agreement, provide the City of Stockton with a copy of its declarations page(s) and endorsement page(s) for each of the required policies.
EXHIBIT 1 1048
Subcontractors
Contractors shall require and verify that all subcontractors, or other parties hired for this work, purchase and maintain coverage for indemnity and insurance requirements as least as broad as specified in this agreement to the extent they apply to the scope of the subcontractor’s work with the same certificate of insurance requirements and naming as additional insureds all parties to this contract. Contractor shall include the following language in their agreement with Subcontractors:
Subcontractors hired by Contractor agree to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to City under the contract documents and provide a valid certificate of insurance and the required endorsements included in the agreement as proof of compliance prior to commencement of any work and to include this same requirement for any subcontractors they hire for this work. A copy of the owner contract document indemnity and insurance provisions will be furnished to the subcontractor upon request. Contractor shall provide proof of such compliance and verification to the City upon request.
Surety Bonds
Contractor shall provide the following Surety Bonds:
1. Bid bond
2. Performance bond
3. Payment bond (or Labor and Material bond)
4. Maintenance bond
The Payment Bond and the Performance Bond shall be in a sum equal to one hundred percent (100%) of the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.
Special Risks or Circumstances
City of Stockton reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
Certificate Holder Address
Proper address for mailing certificates, endorsements and notices shall be:
City of Stockton
Attn: City Risk Services
400 E Main Street, 3rd Floor – HR
Stockton, CA 95202
EXHIBIT 1 1049
INDEMNIFICATION
The indemnity clause in the Contract will follow the general parameters set forth below and is intended to be a Type I Indemnity Clause to the fullest extent as allowed by law. The City reserves the right to change the final indemnity language to be set forth in the Contract.
To the fullest extent permitted by applicable law, Contractor shall and does agree to indemnify, protect, defend and hold harmless the City, its property, and City’s members, partners, successors, consultants, legal representatives, officials, representatives, contractors, subcontractors, employees, agents and the project (collectively, “Indemnitees”) for, from and against any and all liabilities, claims, damages, losses, liens, causes of action, suits, awards, judgments and expenses, attorney and/or consultant fees and costs, taxable or otherwise, of any nature, kind or description of any person or entity, directly or indirectly arising out of, caused by, or resulting from (in whole or in part), (1) the permitting, construction, and/or performance of the Facilities and the Project, or any of parts thereof, (2) the Contract, including any approved modifications, or (3) any act or omission of Contractor, any subcontractor of any tier, anyone directly or indirectly employed by them, or anyone that they control or exercise control over, (collectively, “liabilities”). The obligations of Contractor under this indemnification shall apply to liabilities even if such liabilities arise from or are attributed to the concurrent conduct and/or culpability of any Indemnitee. The only liabilities with respect to which Contractor’s obligation to indemnify the Indemnitees does not apply is with respect to liabilities resulting from the sole negligence or willful misconduct of an Indemnitee and/or the active negligence of the City.
For Contractor’s Work which will strictly be performed by retained design professionals, and in conformance with Civil Code section 2782.8, the indemnity, defense, and hold harmless provisions of this Section shall apply only to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the design professionals retained by Contractor. It is the intent of this indemnity provision to be consistent and in conformance with all applicable laws, and not to exceed the rights allowed under Civil Code section 2782.
Contractor shall promptly advise City in writing of any action, arbitration hearing(s), administrative or legal proceeding or investigation as to which this indemnification may apply, and Contractor shall assume on behalf of City (and the other Indemnitees) and conduct with due diligence and in good faith the defense thereof with counsel satisfactory to City; provided, however, that City shall have the right, at its option, to be represented therein by advisory counsel of its own selection and at its own expense. In such event, Contractor shall direct its counsel to fully and unconditionally share all information and materials with City’s counsel in a timely manner so calculated as to permit City’s counsel to be fully and timely aware of all activity and conduct. In the event of failure by Contractor to fully perform in accordance with this indemnification paragraph, City, at its option, and without relieving Contractor of its obligations hereunder, may so perform.
This indemnification shall not be limited to damages, compensation or benefits payable under insurance policies, workers’ compensation acts, disability benefit acts or other employees’ benefit acts. It is agreed with respect to any legal limitations now or hereafter in effect and affecting the validity or enforceability of the indemnification obligation under this section, such legal limitations are made a part of the indemnification obligation and shall operate to amend the indemnification obligation to the minimum extent necessary to bring the provision into EXHIBIT 1 1050
conformity with the requirements of such limitations, and as so modified, the indemnification obligation shall continue in full force and effect. The provisions shall survive expiration or earlier termination of the contract, the final completion of the work performed herein, and any other services to be provided pursuant to this Agreement.
In the event that the selected Contractor or any employee, agent or subcontractor of the selected Contractor providing services under the Contract is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, the Selected Contractor shall indemnify, defend and hold harmless the City for the payment of any employee and/or employer contributions for PERS benefits on behalf of selected Contractor or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of the City.
*** END OF SECTION ***
EXHIBIT 1 1051
SECTION 01010 - SUMMARY OF WORK
1.0 WORK COVERED BY CONTRACT DOCUMENTS
The Work shall be performed in accordance with the intent of the Contract Documents as stated in the Contract Documents, excluding only the Work indicated or specified to be provided by the City or others under separate contract or other arrangement.
2.0 CONTRACT ADMINISTRATION
The following are designated:
2.1 Name of Construction Manager
Ali Gharegozloo, Engineering Services Manager, Municipal Utilities Department
2.2 RESERVED
2.3 Names of City’s Representative(s)
Ali Gharegozloo, Engineering Services Manager, Municipal Utilities Department Any designated person consistent with the definition of “City’s Representative” as stated in Section 01090.
3.0 TIME ALLOWED FOR COMPLETION
In accordance with the provisions of Paragraph 00700-6.2, Time of Completion, substantial completion of this project shall be completed within three hundred sixty (360) consecutive calendar days from the effective date of the Notice to Proceed and final completion shall be achieved within thirty (30) consecutive calendar days following substantial completion.
4.0 DAMAGES FOR DELAYS
In accordance with the provisions of Paragraph 00700-6.5, Liquidated Damages, for the period of time that any portion of the work remains unfinished after the time fixed for substantial completion, and for the period of time that any portion of the work remains unfinished after the time fixed for final completion, in the Contract documents, as modified by extensions of time granted by the City, it is understood and agreed by the Contractor and the City that the Contractor shall pay the City one thousand dollars ($1,000) per day liquidated damages. Should work remain unfinished after the time fixed for both substantial completion and final completion, the liquidated damages shall remain one thousand dollars ($1,000) per day.
5.0 WEATHER DAYS
In accordance with the provisions of Paragraph 00700-6.4.2.c, Weather Delays, an allowance of ten (10) calendar days of weather caused delay is provided.
EXHIBIT 1 1052
6.0 WORK SEQUENCE AND CONSTRAINTS
Refer to Section 01015-3.7 Cooperation with Others.
7.0 OCCUPANCY REQUIREMENTS
Contractor shall maintain all City access to the operating facility necessary to maintain full functionality of the facility and compliance with permit requirements.
8.0 RESERVED
9.0 TRENCH EXCAVATION
The maximum length of any single trench remaining open without backfill shall be 0 feet unless otherwise agreed to by the City. No trench in public areas or areas with potential critical or frequent operational activities shall be left open during periods when the Contractor is not at the site of work, trenches in these areas shall either be backfilled and temporarily paved, where applicable, or covered with steel trench plates as specified in the technical specifications. No more than two consecutive trench plates will be allowed at anytime when the Contractor is not at the site of work.
10.0 WORK UNDER OTHER CONTRACTS
The City’s Utility Facilities are critical facilities that operate twenty-four hours each and every day. During the life of this Contract, other contracts may be let to construct, operate, maintain, or repair facilities in and/or around the project sites.
The Contractor shall refer to the provisions pertaining to cooperation and coordination elsewhere in these Contract Documents, and shall coordinate with the City to minimize interferences to or caused by other contracts.
11.0 CONTRACTOR’S WORK PERCENTAGE
The minimum portion of work to be performed by the Contractor’s forces shall be fiftyone percent (51%) for this contract.
12.0 UNDERGROUND FACILITIES
The Contractor is responsible for coordinating all project documentation, including but not necessarily limited to, the Contract Documents and existing record drawings for the determination of the location of all underground facilities.
The Contractor shall exercise care in all excavations to avoid damage to existing underground facilities. This shall include potholing or hand digging in those areas where underground facilities are known to exist, prior to installation work, until they have been sufficiently located to avoid damage to the facilities.
Prior to fabrication, the Contractor shall verify the location and elevations of existing underground facilities which the Contractor is connecting to.
EXHIBIT 1 1053
No additional compensation shall be provided to the Contractor for compliance with the provisions of this section or for the damage and repair of facilities due to the lack of such care.
13.0 LEGAL AND CITY HOLIDAYS
New Years Day
Martin Luther King's Birthday
Lincoln's Birthday
President's Day
Cesar Chavez Observance
Memorial Day
Fourth of July
Labor Day
Columbus Day
Veteran's Day
Thanksgiving and the Day after
Christmas
The City will have limited staff and support capabilities available during these holidays.
Requests for inspection or other City services on holidays will be paid for by the Contractor at the established holiday pay scale rate for the services required. The City shall determine the appropriate level of response and support needed in terms of any request. *** END OF SECTION ***
EXHIBIT 1 1054
SECTION 01015 - GENERAL PROVISIONS
1.0 GENERAL
1.1 Description
This Section covers general provisions and requirements for the Work and is supplementary to the Standard Specifications, General Conditions (Section 00700) and Supplemental Conditions (Section 00800) of the Contract.
1.2 Guarantee
The Contractor shall guarantee that the equipment, materials and workmanship furnished under this Contract will be as specified and will be free from defects for a one-year guarantee period, starting from the date of Final Completion of the Work, unless a longer period of time is prescribed by law or required by special provisions elsewhere in the Contract Documents and except as otherwise noted herein. If a specific item (or items) of equipment or material cannot be utilized by the Owner at Final Completion because the Work is incomplete or defective, the guarantee for that item (or items) shall begin when the Owner is provided beneficial use. Beneficial use for any such items shall be provided prior to Final Completion. In addition, the equipment furnished by the Contractor shall be guaranteed to be free from defects in design. Within the guarantee period and upon notification of the Contractor by the Owner, the Contractor shall promptly make all needed adjustments, repairs or replacements arising out of defects, failure or abnormalities which, in the judgment of the Owner, become necessary during such period. The cost of all materials, parts, labor, transportation, supervision, special tools and supplies required for correction of defects, failure or abnormalities shall be paid by the Contractor. In the event warranty work involves repair or replacement of parts, machine work, or any other work which affects the equipment or materials installed under this Contract, the Contractor’s guarantee on such items and work shall be extended for a period of one year from the date of installation of said items, or the performance of said work. If, within ten (10) days, unless specified otherwise by the Owner, after the Owner gives the Contractor notice of a defect, failure, or abnormality of the Work, the Contractor neglects to make the necessary repair or adjustments, the Owner may make the repair or adjustments or order the Work to be done by a third party, with the cost of the Work to be paid by the Contractor. In the event of an emergency where, in the judgment of the Owner, delay would cause serious loss or damage, repairs or adjustments may be made by the Owner, without giving notice to the Contractor, and the cost of the work shall be paid by the Contractor.
1.3 Skilled and Trained Workforce Reporting.
The Contractor and any subcontractor or subconsultant at every tier shall comply with the provisions set forth in California Public Contract Code section 2602 regarding the use of a skilled and trained workforce, Contractor shall be required to provide to the City, upon request, a report demonstrating compliance with the skilled and trained workforce requirements.
1.4 Permits and Licenses
EXHIBIT 1 1055
The Contractor for this Project shall possess at the time of bid a valid California Class A General Engineering Contractor’s License, and shall obtain a City of Stockton business license prior to execution of the Contract.
1.5 Patents
Royalties and fees from patents covering materials, articles, apparatus, devices, or equipment (as distinguished from processes) used in the Work, shall be included in the Contract amount. The Contractor shall satisfy all demands that may be made at any time for such royalties or fees and he shall be liable for any damage or claims for patent infringements.
The Contractor shall, at his own cost and expense, defend all suits or proceedings that may be instituted against the Owner for infringement or alleged infringement of any patents involved in the Work and, in case of an award of damages, the Contractor shall pay such award. Final payment to the Contractor by the Owner will not be made while any suit or claim remains unsettled. The Contractor, however, will not be held liable for the defense of any suit or other proceeding, nor the payment of any damages or other costs for the infringement of any patented process required by the Contract Documents; except if the Contractor has information that the process so required is an infringement of a patent, the Contractor shall be liable for any damages or claims in connection therewith unless he promptly notifies the Owner of such infringement.
2.0 PRODUCTS (Not applicable in this Section)
3.0 EXECUTION
3.1 Public Complaints
The Contractor shall assist the City in responding to public complaints when requested by the City.
3.2 Reserved
3.3 Precedence of Contract Documents
A. Section 00700, Paragraph 1.2 applies.
B. Detail Drawings take precedence over small-scale drawings and full-size Drawings shall be followed in preference to both. Full-size Drawings take precedence over reduced-size Drawings.
3.4 Care and Protection of Property
If any direct or indirect damage is done to public or private property by or on account of any act, omission, neglect or misconduct in the execution of the Work on the part of the Contractor, such property shall be restored by the Contractor, at his expense, to a condition, as determined by the City, which is similar or equal to that existing before the damage was done, or he shall make good the damage in another manner acceptable to the City. The Contractor is responsible for the following at his own expense:
A. To conduct his operation in a manner which will cause the least amount of damage, EXHIBIT 1 1056
inconvenience and interference with the normal use of any public or private property. Such operations shall be confined to the least possible space and shall be accomplished in a neat and workmanlike manner, taking care not to unnecessarily disturb or damage adjoining property, disturbing only those trees, shrubbery, floral pieces or other landscaping planting, fences, buildings, structures or other facilities of any kind or description in the manner and as directed by the City. Remove all transplantable trees, shrubs and bushes that may be damaged or destroyed by construction and reset them after construction. Revegetation of disturbed property shall be accomplished in such manner as required to return the property to its prior condition or better.
B. To store their apparatus, materials, supplies, and equipment in such orderly fashion at the site of the Work as will not unduly interfere with the progress of his Work or the work of any other contractor.
C. To provide suitable storage facilities for all materials which are liable to injury by exposure to weather, theft, breakage, or otherwise. If the City determines that suitable storage for certain materials is not being provided, he may direct the Contractor to remove it from the job site, or to store it properly at the job site.
D. To place upon the Work or any part thereof only such loads as are consistent with the safety of that portion of the Work.
E. To clean up not less than at the end of each work day, all refuse, rubbish, scrap materials, and debris caused by his operations, to the end that at all times the site of the Work shall present a neat, orderly and workmanlike appearance. More frequent clean-up shall be performed as required to maintain access to all other City facilities still in operation.
F. To remove and dispose of off-site in accordance with all Federal, State and local regulations, all surplus material, false-work, temporary structures, including foundations thereof, plants of any description and debris of every nature resulting from his operations, and to put the site in a neat, orderly condition before final payment.
G. To effect all cutting, fitting or patching of his Work required to make the same to conform to the Drawings and Specifications and, except with the consent of the City, not to cut or otherwise alter the work of any other contractor.
H. To close work access during times when active construction work is not ongoing.
3.5 Field Check of Existing Improvements
It shall be the responsibility of the Contractor to check all dimensions, elevations, and location of existing structures, utilities, pipelines, grades or other existing items affected by or affecting the Work under this Contract, prior to the start of construction and ordering of materials and equipment affected thereby. The Contractor shall be solely responsible for determining the extent and cost of all removal and salvage operations.
3.6 Protection of Existing Improvements
EXHIBIT 1 1057
A. In the performance of the Work contemplated under this Contract, the Contractor shall take all precautions necessary, including but not limited to those described herein, to ensure that all existing improvements not specifically indicated for removal are not damaged or interfered with in any way. Should the Contractor disturb or damage such improvements without authorization, all expense for replacement or repair of the existing improvements so disturbed or damaged shall be borne by the Contractor. The Contractor shall be held responsible for all damage to existing utilities, pipelines and substructures whether shown or not.
B. Probe, pot-hole, or otherwise ascertain the exact location of all existing underground improvements in advance of excavation such that no damage to these improvements will occur. In the event interferences in construction are encountered with the various existing improvements, the Contractor shall change the alignment and grade of the Facilities. Additional materials and labor required to accommodate such change shall be addressed in accordance with Section 00700 7.0.
C. Provide for the flow of sewers and drains interrupted during the progress of the Work, in a manner acceptable to the City and immediately cart away and remove all offensive matter.
D. Where interruption of existing utilites occurs as the result of the Contractor’s activity for this Work, whether intentional or accidental, repairs to the interrupted utility shall be performed by the Contractor in a manner acceptable to the City unless instructed otherwise in these Contract Documents. The repairs, including materials used, shall be performed in accordance with the requirements of the respective utility as well as the requirements of the Contract Documents for this Project. Where a conflict exists between the requirements of the respective utility and those of the Contract Documents for this Project, the more stringent of the two shall apply unless instructed otherwise by the City. Additional materials and labor required to accommodate such more stringent requirements shall be addressed in accordance with Section 00700 7.0
3.7 Cooperation With Others
A. The Contractor is hereby advised that work on other contracts within or adjacent to his contract limits may already be in progress. Contracts for construction may also be subsequently awarded to others and because of relocation and construction of various utilities he may not have exclusive occupancy of the territory within or adjacent to the limits of the Contract.
B. In case of interferences between the operations of different construction contractors, the City will determine the work priority of each contractor and the sequence of work necessary to expedite the completion of the entire project. In all such cases, the decision of the City shall be accepted as final.
C. The Contractor shall coordinate his activities with the City as they relate to utility shutdowns. Only City staff is permitted to operate valves or other utilities.
3.8 Unfavorable or Hazardous Construction Conditions
During unfavorable weather, wet ground, or other unsuitable construction conditions, the EXHIBIT 1 1058
Contractor shall confine his operation to work which will not be affected adversely thereby.
No portion of the Work shall be constructed under conditions which would affect adversely the quality or efficiency thereof, unless special means or precautions are taken by the Contractor to perform the Work in a proper manner in accordance with the Contract Documents and applicable laws.
*** END OF SECTION ***
EXHIBIT 1 1059
SECTION 01025 - MEASUREMENT AND PAYMENT
1.0 MEASUREMENT OF QUANTITIES
1.1. General
Measurements of the completed work shall be in accordance with, and by instruments and devices calibrated to United States Standard Measures and the units of measurement for payment, and the limits thereof, shall be made as shown on the Plans, Specifications, and General Requirements.
1.2 Units of Measurement
Measurements shall be in accordance with U.S. Standard Measures. A pound is an avoirdupois pound. A ton is 2,000 pounds avoirdupois. The unit of liquid measure is the U.S. gallon.
1.3 Certified Weights
When payment is to be made on the basis of weight, the weighing shall be done on certified platform scales, or when approved by the City’s Representative, on a completely automated weighing and recording system. The Contractor shall furnish the City’s Representative with duplicate licensed weighmaster's certificates showing the actual net weights. The City will accept the certificates as evidence of the weights delivered.
1.4 Methods of Measurement
Materials and items of work which are to be paid for on the basis of measurement shall be measured in accordance with the method stipulated in the particular sections involved. In determining quantities, all measurements shall be made in a horizontal plane unless otherwise specified.
Material not used from a transporting vehicle shall be determined by the City’s Representative and deducted from the certified tag.
When material is to be measured and paid for on a volume basis and it would be impractical to determine the volume, or when requested by the Contractor in writing and approved by the City’s Representative in writing, the material will be weighed and converted to volume measurement for payment purposes. Factors for conversion from weight measurement to volume measurement will be determined by the City’s Representative and shall be agreed to by the Contractor before such method of measurement of pay quantities will be adopted.
Full compensation for all expense involved in conforming to the above requirements for measuring and weighing materials shall be considered as included in the unit prices paid for the materials being measured or weighed and no additional allowances will be made therefore.
Quantities of material wasted or disposed of in a manner not called for under the Contract; or rejected loads of material, including material rejected after it has been placed by reason of failure of the Contractor to conform to the provisions of the Contract; or material not EXHIBIT 1 1060
unloaded from the transporting vehicle; or material placed outside the lines indicated on the plans or given by the City’s Representative; or material remaining on hand after completion of the Contract, will not be paid for and such quantities will be deducted from the final total quantities. No compensation will be allowed for hauling rejected material.
2.0 RESERVED
3.0 PAYMENT
Partial payment shall be made based on the agreed completion of work and the approved schedule of values. Payment shall be in accordance with Section 00500-2 and Section 00700-8.
*** END OF SECTION ***
EXHIBIT 1 1061
SECTION 01035 - MODIFICATION PROCEDURES
1.0 GENERAL
A. This section provides supplementary procedures for the administration of changes to the Contract as specified in Section 00700-7.0 CHANGES IN THE WORK. Corrections, alterations, or modifications of the work under this Contract may amount to Extra Work, as defined in the Agreement, and when such corrections, alterations, or modifications decrease the amount of work to be done, such subtracted work shall be known as Omitted Work.
B. In accordance with the principals of design-build project delivery, increases to the scope of work resulting from design oversights may not constitute Extra Work. Differentiation between scope additions warranting a change in the Guaranteed Maximum Price (GMP) or Contract Time and scope modifications not warranting a change in the GMP or Contract Time (design refinements) shall be based on the decision flow chart attached to this section (Exhibit 01035-A). As shown in the decision flow chart, where agreement regarding the nature of the change cannot be reached, the GMP will be increased in an amount equal to the Cost of the Work, as defined in Exhibit Q of Section 00500, excluding the markup on Actual Construction Cost provided for in Exhibit Q. Any adjustment to the Contract Time will be subject to evaluation of the change as an unforeseen condition.
C. Any change in the scope of Work or deviation from the Contract Documents including, without limitation, Extra Work or Omitted Work, shall not invalidate the original Contract, and shall be performed under the terms of the Contract Documents. The difference in Cost of the Work resulting from Extra Work or Omitted Work will be added to or deducted from the GMP, as the case may be, by a fair and reasonable valuation, as outlined in the Contract Documents.
D. Any agreed upon change to the GMP or adjustment in Contract Time shall be incorporated in a written Change Order issued by the City, which shall be written so as to show acceptance on the part of the Contractor as evidenced by its signature. By signature of the Change Order, the Contractor acknowledges that the adjustments to the GMP and Contract Time contained in the Change Order are in full satisfaction and accord and so waives any right to claim any further cost and time impacts at any time during and after completion of the Contract for the changes encompassed by the Change Order.
E. Only the Contractor or the City may initiate changes in scope of Work or deviation from Contract Documents.
2.0 CONTRACT MODIFICATION PROCEDURES
A. Request for Proposal (RFP)
1. The City may issue a Request for Proposal (RFP) to the Contractor in connection with the City considering an addition to, or deletion from, or other change in the Work. RFPs shall not be deemed to be directions to proceed with any addition, deletion or change to the Work.
2. Whenever the Contractor elects to prepare a cost proposal in response to an RFP, Contractor shall prepare and submit to City for consideration a Proposed Change Order (PCO) using a form acceptable to the City’s Representative. All PCO’s must contain a complete breakdown of costs of credits, deducts, and extras; and itemize materials, labor, equipment, special services, taxes, and markups as applicable. All Subcontractor Work EXHIBIT 1 1062
shall be so indicated. Individual entries on the PCO form shall follow the cost items defined in Paragraph 01035-3.0 Cost Determination. The Contractor shall provide all required cost information requested by an RFP as part of its Proposed Change Order.
3. Both parties acknowledge that responding to a City RFP for a project change may require additional work by the Contractor such as engineering, scheduling, and cost estimating work without any guarantee that the City will elect to proceed with the requested change.
Therefore, in cases where the amount of work to prepare a PCO is, in the Contractor’s opinion, significant, Contractor may submit a PCO for the costs associated with evaluating and responding to the City’s RFP as a separate PCO. City approval of such PCO will be a condition precedent to the Contractor responding to the original RFP.
4. Upon receipt of the Contractor's PCO, which shall include a detailed breakdown as prescribed in this Section, the City’s Representative will act promptly thereon. If City’s Representative takes no exception to the PCO, City’s Representative will prepare a Change Order for City and Contractor signatures, provided that City has elected to proceed with the changed Work. If a PCO is not acceptable to the City’s Representative, the City’s Representative will indicate to Contractor the unacceptable items in the PCO.
Except as otherwise provided in this Section, Contractor shall respond to City’s Representative with a revised PCO.
5. If the parties do not agree on the price or time adjustment in response to an RFP, City may issue a unilateral change order pursuant to the Agreement, Section 00700-7.2.4.
Contractor shall perform the changed Work, notwithstanding any claims or disagreements of any nature, with the understanding that it preserves all rights to pursue adjustments to the GMP and/or Contract Time in connection with the change.
6. When the necessity to proceed with a change does not allow the City’s Representative sufficient time to conduct a proper check of the Contractor's cost proposal (or revised cost proposal), City’s Representative may order Contractor to proceed with the change, with the understanding that the Contractor will account for the Cost of the Work for the respective change separately from other Cost of the Work to allow all parties to negotiate in good faith to determine the value of the change at the earliest practical date.
B. Field Directive/Supplemental Instruction
1. The Contractor may be issued a Field Directive or Supplemental Instruction resulting from a Request for Clarification (RFC) or other instructions from the City’s Representative.
2. If the Contractor is satisfied with Field Directive or Supplemental Instruction and does not request a change in the GMP or Contract Time, then the Field Directive or Supplemental Instruction shall be executed by the Contractor without a Change Order.
Such Field Directive or Supplemental Instruction shall be logged by the City Representative in a Field Directive log.
3. If the Contractor believes the Field Directive/Supplemental Instruction represents a change in scope of the Work or an unforeseen condition, justifying a change in the GMP or Contract Time, then Contractor must notify the Resident City Representative within ten (10) Working Days following receipt of Field Directive/Supplemental Instruction and before proceeding with this work. If the Resident City Representative considers Contractor's notice to be justified, the instructions of the Field Directive/Supplemental Instructions will be revised or a Request for Proposal will be issued by the City’s Representative. The Contractor shall have no claim for additional compensation or extension of the schedule because of any such Field Directive/Supplemental Instruction EXHIBIT 1 1063
unless the Contractor provides the City’s Representative written notice thereof within the time frame specified above, unless the City is not prejudiced by Contractor's untimely notice. In addition, the Contractor shall within fifteen (15) Working Days from the date of the Contractor furnishing written notice provide a Proposed Change Order and Time Impact Analysis, if requested, to support any request for GMP increase or time extension.
Should the work at issue impact Contractor's operations for a period longer than fifteen (15) days, Contractor shall update its request for additional compensation and/or additional time, every thirty (30) days until the disputed work is no longer allegedly impacting Contractor's operations. In addition, Contractor shall comply with the requirements of the Agreement, Section 00700 concerning documentation of the cost of the subject work and shall provide accounting of subject work separate and distinct from work accounted for under the GMP. This separate accounting will be used to demonstrate the Cost of the Work for each Field Directive/Supplemental Instruction.
4. Should the Contractor proceed with the work affected before receipt of a response from the City’s Representative, any portion of the work which is not done in accordance with the City's interpretation, clarifications, instructions, or decisions is at Contractor’s risk.
5. If the Contractor and City’s Representative still do not agree on the Field Directive’s impact to the GMP or Contract Time, the Contractor will be directed again in writing to make the changes covered in the Field Directive/Supplemental Instructions as Force Account Work and Contractor shall do so notwithstanding any claims or disagreements of any nature. Contractor may file a Claim in accordance with the Agreement.
C. Field Order – Force Account Work
1. If either the amount of work or payment for a Change Order cannot be determined or agreed upon beforehand, the City may direct by written unilateral Change Order or Field Order that the work be done on a force account basis. The term "force account" shall be understood to mean that payment for the work will be made based on an accounting of the Contractor's Cost of the Work as described in the Agreement, Section 00500-Exhibit Q, Guaranteed Maximum Price, and Paragraph 01035-3.0 Cost Determination.
2. Prior to the commencement of force account work, the Contractor shall notify the City’s Representative of its intent to begin work. The Contractor shall maintain accurate cost records, separate from the cost categories for the balance of the Work, which depict all costs incurred for the authorized force account work. Upon request by the City’s Representative or City, these cost records must be made available for review as provided in the Agreement.
3. All subcontractors that expend labor, equipment and materials on force account work shall record those costs daily by using a Daily Extra Work Report form provided by or approved by the City’s Representative. The subcontractor reports, if found to be correct, shall be signed by the subcontractor, Contractor and City’s Representative, and a copy of which shall be furnished to the City’s Representative no later than the working day following the subcontractor’s performance of said work. The Daily Extra Work Report shall thereafter be considered the true record of force account work provided by the subcontractor. If the City’s Representative does not agree with the labor, equipment and/or materials listed on the subcontractor's daily force account report, the City’s Representative shall sign-off on the items on which they are in agreement. The City’s Representative shall then review the items of disagreement and will advise the Contractor, in writing, of its determination. If the Contractor disagrees with this determination, it shall have the right to file a Claim notice per the Agreement. Sign off by the City Representative on force account work shall constitute the City’s approval for payment of said work.
EXHIBIT 1 1064
4. The Contractor shall maintain its records in such a manner as to provide a clear distinction between the direct costs of subcontractor work paid for on a force account basis and the costs of other operations.
5. To receive partial payments and final payment for force account work, the Contractor shall submit, in a manner approved by the City’s Representative, detailed and complete documented verification of the Contractor's and any of its subcontractor's Cost of the Work involved in the force account pursuant to the pertinent unilateral Change Order or Field Order. Such costs shall be submitted within thirty (30) days after said work has been performed. No payments will be made for work billed and submitted to the City’s Representative after the thirty (30) day period has expired, unless City is not prejudiced by Contractor's untimely billing and submittal of costs.
D. Differing Site Conditions
1. Contractor shall submit Notices of Differing Site Conditions regarding differing Site conditions encountered in the execution of the Work pursuant to the Agreement, Paragraph 00700-7.2, Differing Site Conditions which shall govern. If City determines that a change in GMP or Contract Time is justified, City will issue an RFP or a CCD.
E. Hazardous Waste Conditions
1. Contractor shall submit Notices of Hazardous Waste Conditions regarding hazardous materials encountered in the execution of the Work pursuant to the Agreement, Paragraph 00700-7.3, Differing Site Conditions, which shall govern. If City determines that a change in GMP or Contract Time is justified, City will issue RFP or a CCD.
F. All Changes
1. Upon request of the City’s Representative, the Contractor shall provide the following information to support the request for change in cost or time:
a. Copy of original quotations, purchase order or invoices to verify costs included in original pricing.
b. Copy of all quotations, purchase order or actual invoices to support new costs submitted.
c. Estimated insurance and bond costs resulting from change. d. Copy of accounting of the Cost of the Work.
e. Certified payroll records.
f. A list of equipment with manufacturer’s name and model number and the alphanumeric designation used in the Equipment Rental Rates prepared by the California Department of Transportation, unless the equipment is included in the Section 00500, Exhibit Q, Guaranteed Maximum Price.
g. Other information, as reasonably required, to document the labor, equipment and materials used.
2. Paragraph 4.0 below provides expanded Contractor requirements regarding providing access to cost pricing data and related change records.
EXHIBIT 1 1065
3. Correlation of Other Items:
a. Contractor shall revise Application for Payment forms to record each authorized Change Order or CCD as a separate line item and adjust the GMP on the next monthly progress billing.
b. Contractor shall revise the Progress Schedules prior to the next monthly pay period to reflect the effects, if any, of all authorized Change Orders or CCDs. c. Contractor shall enter changes in project Record Documents as part of preparing the project Record Documents.
3.0 COST DETERMINATION
Payment for any extra work or Change Order work shall be determined by the unit cost presented in the GMP of Section 00500, Exhibit Q or mutually agreed upon.
4.0 COST PRICING DATA AND ACCESS TO RECORDS
A. All cost and pricing data submitted by the Contractor with respect to any change, prospective or executed, or any claim for extra compensation shall be a true, complete, accurate and current representation of actual cost and pricing of the work.
B. The City’s Representative may require a formal certification as to cost and pricing data submitted by the Contractor.
C. Contractor shall provide the City’s Representative documentation of all costs and access to the records of Contractor and Subcontractors as necessary to verify the information provided.
5.0 TIME EXTENSIONS FOR CHANGE ORDERS
A. If the Contractor requests a time extension for the extra work necessitated by a proposed Change Order, the request must comply with the applicable requirements of Section 00700. *** END OF SECTION ***
EXHIBIT 1 1066
EXHIBIT 1 1067
SECTION 01040 - COORDINATION
1.0 GENERAL
This Section covers coordination requirements supplementary to those of the Contract and other Sections of these Specifications. These requirements may be modified as mutually agreed upon by the Contractor and Construction Manager.
The Contractor will obtain construction schedules from subcontractors and suppliers, and assume responsibility for correctness.
The Contractor will incorporate schedules from subcontractors and suppliers into Progress Schedule to plan for and comply with sequencing constraints.
2.0 COOPERATION WITH OTHERS
The Contractor is hereby advised that work on other contracts within or adjacent to its contract limits may already be in progress. Contracts for construction may also be subsequently awarded to others and because of relocation and construction of various utilities he may not have exclusive occupancy of the territory within or adjacent to the limits of the Contract.
In case of interferences between the operations of different construction contractors, the Construction Manager will determine the work priority of each contractor and the sequence of work necessary to expedite the completion of the entire project. In all such cases, the decision of the Construction Manager shall be accepted as final. The temporary delay of the Contractor's work due to such circumstances shall not be considered as justification for claims for additional compensation.
The Contractor shall coordinate his activities with the City as they relate to utility shutdowns. The City facilities must operate 24 hours per day, except as otherwise noted elsewhere in these specifications, and only the Owner's staff will be permitted to operate valves or other utilities.
3.0 ORGANIZATION AND COORDINATION
3.1 Monthly Reports
The Contractor shall prepare and submit a progress report to the Construction Manager by the tenth calendar day of each month. This progress report shall include a description of all efforts completed during the previous month, tasks scheduled for the next month, outstanding problems, and personnel changes. The report shall also include updated schedule milestones with narratives.
3.2 Daily Reports
EXHIBIT 1 1068
The Contractor shall complete a Contractor's daily report, a copy of which shall be submitted to the Construction Manager on a daily basis by the end of the succeeding work day. The information contained in the daily report shall include, but not necessarily be limited to, the following:
· Project name and number
· Contractor's name
· Date
· Report #__ (also "page ___ of ___")
· Weather conditions
· Staff employed on the project and duties performed
(Distinguish between field and office staff)
· Trades on job site, respective number of trades persons used, and work description · Subcontractors on job site, number of respective subcontractor's staff present and work description
· Equipment on job site, type and number and whether or not used. · Summary of work performed
· Materials delivered to site
· Delays to project
· Visitors to project
· Other comments
· Contractor's signature
· Safety/accident activities
The Contractor's standard daily report form may be used provided it furnishes, as a minimum, all the information cited above.
3.3 Correspondence
All correspondence from the Contractor to the Construction Manager shall be dated and numbered in sequence. The Construction Manager will likewise number its correspondence and transmittals to the Contractor.
4.0 SYSTEM OUTAGE REQUESTS
Modifications to existing facilities, the construction of new facilities, and the connection of new to existing facilities may require the temporary outage or bypass of treatment processes, equipment, utilities, or other facilities. In addition to the Construction Schedule required under Section 01310, the Contractor shall submit a System Outage Request (SOR) and a detailed outage plan and time schedule for all construction activities which will make it necessary to remove a tank, pipeline, channel, electrical circuit, control circuit, equipment, structure, road or other facilities from service.
The SOR and outage plan shall be submitted to the Construction Manager for review and acceptance a minimum of two weeks in advance of the time that such outage is needed. The outage plan shall be coordinated with the construction schedule specified in Section 01310 and shall meet the restrictions and conditions specified in this section. The detailed plan shall describe the Contractor's method for preventing bypassing of other facilities; the length of time required to complete said operation; any necessary temporary power, controls, instrumentation or alarms required to maintain control, monitoring and alarms for the City’s facilities; and the manpower, EXHIBIT 1 1069
plant and equipment which the Contractor shall provide in order to ensure proper operation of associated treatment units.
In addition, the outage plan shall describe the Contractor's contingency plan that shall be initiated in the event that his temporary facilities fail or it becomes apparent that the time constraints described in the approved outage plan cannot be met. The contingency plan shall conform to all specified outage requirements. All costs for preparing and implementing both the outage and contingency plans shall be borne by the Contractor with no additional compensation therefore.
The Contractor shall provide, Monday through Friday at least two days prior to the actual shutdown, written confirmation of the shutdown date and time, or written notification that the schedule for performing the work has changed or revisions to the outage plan are required.
5.0 SEQUENCING OF THE WORK
Operations of the City’s facilities are critical to the public health and safety of the citizens of Stockton. Sufficient facilities to serve the needs and demands of the City shall remain in service at all times. The City shall be the sole judge as its needs and the facilities that must remain in service to provide adequate service.
The Contractor shall coordinate and cooperate with the City to establish his schedule for work at all of the project facilities. The approved project schedule shall be subject to change as it pertains to site work and shutdowns, when required by the City to accommodate unforeseen or emergency situations in the operation of its facilities.
6.0 ACCESS TO PROJECT FACILITIES
The City will provide access to each facility site included in this contract work. The Contractor shall ensure that each site is locked and secure, with alarm activated, at all times that workers are not at the site.
*** END OF SECTION ***
EXHIBIT 1 1070
SECTION 01050 - FIELD ENGINEERING
1.0 CHECK OF EXISTING IMPROVEMENTS
It shall be the responsibility of the Contractor to check all dimensions, elevations, and location of existing structures, utilities, pipelines, grades or other existing items affected by or affecting the Work under this Contract, prior to the start of construction and ordering of materials and equipment affected thereby. The Contractor shall be solely responsible for determining the extent and cost of all removal and salvage operations.
2.0 DATUM
Where applicable, elevation datum for this Project is based on the Project bench mark shown on the Drawings. All connections shall be installed based on actual elevations of existing structures to which connections are made.
3.0 LINES AND GRADES
The Contractor shall lay out all work, including structures and pipelines, and shall be responsible for any errors resulting therefrom. In all questions arising as to proper location of lines and grades, the City Representative's decision will be final.
As part of the GMP or Lump Sum, the Contractor shall provide and be responsible for the layout of all work on this project. The Contractor shall provide all necessary surveys, field staking, and positioning for the construction of all components at the proper alignment, elevations, grades, and positions, as indicated on the Drawings and as required for the proper operation and function. The Contractor shall stake the work limits.
The Contractor's layout shall be based on existing structures, survey control and benchmarks established by the Contractor.
The Contractor shall supply such labor as required to aid and assist the City’s Representative in checking location and grades of the work as set by the Contractor, if requested by the City’s Representative. This shall include moving materials and equipment located between monuments and the construction work.
*** END OF SECTION ***
EXHIBIT 1 1071
SECTION 01060 - REGULATORY REQUIREMENTS
1.0 APPLICABLE CODES
This Section summarizes without limitation the laws and codes by which the Work shall be designed and to which the Contractor shall conform in the prosecution of the Work. The Contractor shall make available for their use at the site such copies of laws, regulations, or codes applicable to the Work as the City may request.
1.1 Laws and Regulations
As specified in Sections 00700-4.11 and 00700-4.12.
1.2 Codes
a. California Building Code
b. Title 8, Industrial Relations, California Administrative Code, Chapter 4, Division of Occupational Health and Safety, Safety Orders. c. Title 19, Public Safety, California Administrative Code, State Fire Marshal. d. Local Mechanical Code.
e. Local Plumbing Code.
f. National Fire Protection Association.
g. National Electric Code
h. State and Local Public Health Codes.
i. San Joaquin Valley Unified Air Pollution Control District Regulations. j. Other applicable codes as identified in the Basis of Design Report Conflicting codes deemed applicable by the City of Stockton Building Department or Building Official shall take precedence. The GMP is based on compliance with codes in effect and utilized by the City of Stockton for enforcement on the date of Amendment No. 1 to the Agreement.
1.3 Specifications
Standard Specifications and State of California Specifications, as defined in Section 01090.
2.0 LICENSES, FEES, AND PERMITS
As specified in Section 00700-4.9 Permits.
2.1 Contractor’s License
The Contractor shall possess and maintain throughout the duration of the Contract, a valid California Class A General Engineering Contractor license.
2.2 Business License
The Contractor shall possess prior to the execution of the Contract and maintain throughout the duration of the Contract, a valid City of Stockton business license.
EXHIBIT 1 1072
3.0 EARTHQUAKE DESIGN AND RESTRAINT
Design, construct and attach all manufactured equipment supplied under this Contract, and as noted in the respective technical Sections, to resist stresses produced by seismic forces specified in this Section. Rigidly attach equipment that does not vibrate during normal operation. For equipment that vibrates during normal operation, attach by means of isolators with mechanical stops that limit movement in all directions unless it can be demonstrated by calculations that such stops are not required. Restrain equipment or portions of equipment that move during normal operation with mechanical devices that prevent displacement unless it can be demonstrated by calculations that such restraints are not required.
A. Minimum Earthquake Forces: The minimum earthquake forces will be based on calculations prescribed by the applicable Building Code and consistent with the Basis of Design Report prepared by the Contractor.
B. Contractor shall require Subcontractors to provide certification of compliance with applicable building codes for earthquake forces.
*** END OF SECTION ***
EXHIBIT 1 1073
SECTION 01090 - REFERENCES
1.0 DEFINITIONS
Unless otherwise stated, the words directed, required, permitted, ordered, instructed, designated, applicable, appropriate, sufficient, proper, desirable, necessary, prescribed, approved, acceptable, satisfactory or words of like import, refer to actions, expressions, and prerogatives of the City or City’s Representative.
Masculine gender words include the feminine. References to gender, such as "workman" and "flagman" and the pronouns "he" or "his" referring to such titles, are abstract in the specifications, used for the sake of brevity, and are intended to refer to persons of either sex.
Singular words include the plural and "person" includes firms, companies, and corporations.
Where used in the Contract Documents, the following words and terms shall have the meanings indicated. The meanings shall be applicable to the singular, plural, masculine, and feminine of the words and terms.
Acceptance - Approval by the City that the Contractor has successfully performed the Acceptance Test and successfully met all conditions of Acceptance for the Facilities as specified in the Contract Documents.
Acceptance Tests - The tests for Acceptance that have been developed between the City and the Contractor and incorporated into the Contract.
Act of God - An earthquake, flood, cyclone, or other cataclysmic phenomenon of nature. A rain, windstorm, high water, or other natural phenomenon, which might reasonably have been anticipated from historical records of the general locality of the work, shall not be construed as an Act of God.
ADA - Americans with Disabilities Act.
Addenda - Written or graphic instruments issued which modify or interpret the Contract Documents, drawings, and specifications, by additions, deletions, clarifications, or corrections.
Agreement - The written document covering the performance of the Work as more fully described in the Contract Documents.
Allowance - Money set aside under the Contract for a special purpose identified and defined in the GMP of Section 00500, Exhibit Q.
ASTM - The American Society for Testing and Materials.
Authorized City Official - The City Manager or his designee.
AWWA - The American Water Works Association.
Bankruptcy - Legally declared financial insolvency.
EXHIBIT 1 1074
Beneficial Occupancy - The City operating and maintaining specific constructed facilities for the purpose for which they are intended, subject to the requirements of Section 00700-8.5 Beneficial Occupancy.
Bond(s) - Bid, Performance, or Labor and Material Bonds and other instruments of surety, furnished by the Contractor and Contractor's surety in accordance with the Contract Documents.
Calendar Day - Any day including legal holidays, Saturdays and Sundays.
CEQA - The California Environmental Quality Act, Public Resources Code Section 21000 et seq.
Charter - The Charter of the City of Stockton.
City - A public or quasi-public agency or authority, corporation, association, partnership, or individual for whom the work is to be performed. Under this contract, the City is identified by name in the Contract.
City Code - The Codified Ordinances of the City of Stockton, California.
City Council - The Council of the City of Stockton, California.
City Ordinance - Section 3 100 et. Seq. of the City Code.
City’s Representative (or City Representative) - The Municipal Utilities Director, the Assistant Municipal Utilities Director, City Building Official, and/or any individual(s) and/or agent, including a Construction Manager, that the City has designated to act as its official representative. The City’s Representative will determine whether the Work complies with Applicable Code Requirements, will determine whether and when it is appropriate to issue a Certificate of Occupancy, and is authorized to carry out all rights and responsibilities as indicated in the Contract Documents.
City Representative Team - The City Representative Team is a team of individuals that will perform certain aspects of the City Representative’s duties.
Construction Documents - The plans and specifications prepared by the Contractor for the Project, approved by the City. The Construction Documents shall set forth in detail all items necessary to complete the construction (other than such details customarily provided by others during construction) of the Project in accordance with the Contract Documents (subject to their completion following commencement of the Construction Phase).
Construction Manager – The person designated, in writing, by the City to act as its representative at the construction site and to perform construction inspection services and administrative functions relating to this Contract. Initial contact by the Contractor with the City shall be through the Construction Manager.
Contract Change Order - A written order to the Contractor, covering changes in the plans or quantities, or both, and establishing the basis of payment and time adjustments for the work affected by the changes. Also referred to as a Change Order.
EXHIBIT 1 1075
Contract Documents - The documents defined in Section 00500 – Progressive DesignBuild Contract; the Front End Contract Documents (Sections 00100 through 01700); plans and specifications; and those that can be inferred therein.
Contractor - The person or persons, firms, partnership, corporation, joint venture or combination thereof, who have entered with the City, as party or parties of the second part of its or their legal representatives. With respect to matters related to Professional Errors and Omissions insurance, “Contractor” shall mean PCL Construction, Inc., the insured party.
Contract Sum - The Phase 1 Lump Sum Price, Phase 2 GMP or Lump Sum as defined in 00500 – Progressive Design-Build Contract.
Contract Time - The various “Contract Times” for Phase 1 and 2, and for completion of Final Design Documents as defined in 00500 – Progressive Design-Build Contract.
Contractor's Plant and Equipment - Equipment, material, supplies, and all other items, except labor, brought onto the site by the Contractor to carry out the Work, but not to be incorporated in the Work.
Corrective Work - Work identified during the course of construction, by any party, that is undertaken to correct Defective Work. Excepting Corrective Work resulting from negligent errors or omissions, the cost of Corrective Work is included in the Cost of the Work.
Day(s) - Calendar Day(s).
Defective Work - Work that is unsatisfactory, faulty, omitted, incomplete, deficient, or does not conform to the requirements of the Contract Documents, directives of City’s Representative, or the requirements of any inspection, reference standard, test, or approval specified in the Contract Documents.
Design Builder - See “Contractor”.
Design Materials - Any and all documents, shop drawings, electronic information, data, plans, drawings, sketches, illustrations, specifications, descriptions, models and other information developed, prepared, furnished, delivered or required to be delivered by Contractor to City under the Contract Documents or developed or prepared by Contractor specifically to discharge its duties under the Contract Documents.
Direct - Action of the City or City’s Representative by which the Contractor is ordered to perform or refrain from performing work under the Contract.
Drawings- Refers to the Contract drawings, profiles, cross sections, elevations, details, and other working drawings and supplementary drawings, or reproductions thereof, signed by the Design Consultant, approved by the City, and are referred to in the Contract Documents, which show the location, character, dimensions, and details of the work to be performed.
The terms drawing, plan and plans have the same meaning as the term drawings unless otherwise stated or specified.
Engineer – When used in the context of an individual designated by the City, see City’s Representative. When used in the context of Contractor’s designee, the term refers to the EXHIBIT 1 1076
Design Builder’s applicable responsible engineer for the design discipline, or scope of work, in question.
Engineer of Record – The Contractor.
Field Directive - Written documentation of the actions of the City or City’s Representative in directing the Contractor. Also referred to as a Directive.
Field Order - A written instruction given to the Contractor authorizing work that is a change to the scope of work carried out on a time and material basis.
Final Completion - As defined pursuant to the General Conditions 00700-8.9.
Float - Float or "total float" shall be defined as provided in the Associated General Contractors of America "CPM in Construction, A Manual for General Contractors".
Furnish - To deliver to the job site or other specified location any item, equipment, or material.
General Conditions - Part of the Contract Documents representing the general clauses that establishes how the project is to be administered.
General Requirements - Part of the Contract Documents establishing special conditions or requirements peculiar to the work and supplementary to the General Conditions.
Geotechnical Engineer - Registered professional engineer in the State of California who conducted the site sub-surface investigation and prepared the soils report utilized for design purposes.
Guaranteed Maximum Price, or GMP – The upper limit of the amount to be paid by City to Contractor for the design and construction of facilities, as defined in Section 00500-1(f).
Herein - Refers to information presented in the Contract Documents.
Holidays - Legal holidays designated by the City or specifically identified in the Contract and Paragraph 01010-13.0
Inspector – City or Construction Manager staff who inspect and review the work for conformance with the Contract Documents.
Install - Placing, erecting, or constructing any item, equipment, or material.
Laboratory - The designated materials testing laboratory authorized by the City to test materials and work involved in the Contract.
Life Cycle Cost - The sum of all costs over the useful life of a building, system, or product, including the cost of design, construction, acquisition, operation, maintenance, and salvage value. The useful life will be determined by the City.
Lump Sum Price – Phase 1 Lump Sum Price and as further defined in the Contract Documents.
EXHIBIT 1 1077
MGD. The term “MGD” means millions of gallons per day.
MUD. The term “MUD” means Municipal Utilities Department of the City of Stockton.
NEPA. The term “NEPA” means the National Environmental Policy Act.
Notice of Award - A written notice by the City to the Contractor informing it that the Contract has been awarded to the Contractor.
Notice to Proceed (NTP) - The written notice by the City to the Contractor authorizing the Contractor to proceed with the Work and establishing the date of commencement of the Work.
Owner - City of Stockton.
Paragraph - For references or citation purposes, refers to the paragraph(s), called out by paragraph number and alphanumeric designator.
Person - Includes firms, companies, corporations, partnerships, and joint ventures.
Project - The undertaking to be performed under the provisions of the Contract.
Project Manual - Those Contract Documents which are bound into one or more volumes.
Proposal Documents - Means the Request for Qualifications, Statement of Qualifications, Request for Proposal, and Proposals provided for this Project, including the documents referenced and incorporated into the Proposal Documents.
Provide - Furnish and install, complete in place.
Punch List - List of incomplete items of work and of items of work which are not in conformance with the Contract.
Resident City Representative – A member of the City Representative Team normally present at the Site who is responsible for observing the Work and serving as the primary point of contact for the Contractor. In the absence of the Resident City Representative, any other member of the City Representative Team may fulfill the Resident City Representative’s responsibilities.
Shall - Refers to actions by either the Contractor or the City and means the Contractor or City has entered into a covenant with the other party to do or perform the action.
Shown - Refers to information presented on the Drawings, with or without reference to the Drawings.
Site - The property as described in the General Conditions or as shown on the Drawings.
Site Superintendent - The Design Builder’s Site Supervisor responsible for the construction of the project.
EXHIBIT 1 1078
Specifications - That part of the Contract Documents consisting of the General Conditions, Supplementary Conditions, General Requirements, applicable State Standard Specifications, and Technical Specifications.
Specify - Refers to information described, shown, noted or presented in any manner in any part of the Contract.
Standard Specifications - The City of Stockton Standard Specifications and Plans in effect at the time of Contract execution.
State of California Specifications - The State of California Department of Transportation Standard Specifications in effect at the time of Contract execution. Also referred to as State Standard Specifications and Caltrans Standard Specifications.
Subcontractor - A subcontractor is a person or entity who has a direct contract with the Contractor to perform any of the Work at the Site. The term subcontractor means a subcontractor or subcontractor's authorized representative. The term subcontractor, does not include any separate contractor or any separate contractor's subcontractors.
Submittals - The information which is specified for submission to the City’s Representative in accordance with Section 01300.
Substantial Completion – As defined pursuant to the General Conditions 00700-8.6.
Sub-subcontractor - A sub-subcontractor is a person or entity who has a direct or indirect contract with a subcontractor to perform any of the Work at the Site. The term sub-subcontractor means a sub-subcontractor or an authorized representative thereof.
Subtier-subcontractor – see “Sub-subcontractor”
Supplier - Any person, firm, corporation, or organization who supplies materials or equipment for the Work, including that fabricated to a special design, and may also be a Subcontractor or a Sub-subcontractor.
Surety - The person, firm, corporation, or organization that joins with the Contractor in assuming the liability for the faithful performance of the Work and for the payment of all obligations pertaining to the Work in accordance with the Contract Documents by issuing the Bonds required by the Contract Documents or by law.
Value Engineering - Modifications to the project which are proposed by the Contractor and which provide the product or services equivalent to that called for in the project specifications, but at lower cost than the cost of those products or services designated in the specifications.
Vendor – See “Supplier”.
Will - Actions entered into by the Contractor or the City as a covenant with the other party to do or to perform the action.
Work - The labor, materials, equipment, supplies, and other items necessary for the execution, completion, and fulfillment of the Contract.
EXHIBIT 1 1079
Working Day - Any day, other than a holiday, Saturday or Sunday, on which the Contractor may proceed with regular work on the current controlling operation as determined by the City’s Representative toward the completion of the Contract.
2.0 ABBREVIATIONS
Whenever the following terms are used, the intent and meaning shall be as follows:
AASHTO American Association of State and Highway and Transportation Officials AAMA Architectural Aluminum Manufacturers Association
ABMA American Boiler Manufacturers Association
ACI American Concrete Institute
ADC Air Diffusion Council
AGA American Gas Association
AGMA American Gear Manufacturers Association
AISC American Institute of Steel Construction
AISI American Iron and Steel Institute
AMCA Air Moving and Conditioning Association
ANSI American National Standard Institute (formerly United States of America Standards Institute)
APA American Plywood Association
API American Petroleum Institute
AREA American Railway Engineers Association
ASCE American Society of Civil Engineers
ASHRAE American Society of Heating, Refrigerating and Air Conditioning City’s Representatives
ASME American Society of Mechanical Engineers
ASTM American Society of Testing and Materials
AWPA American Wood-Preserver's Association
AWS American Welding Society
AWWA American Water Works Association
CAGI Compressed Air and Gas Institute CAL/OSHA State of California Department of Industrial Relations, Division of Industrial Safety
CBM Certified Ballast Manufacturers
CBC California Building Code
CBR California Bearing Ratio
CI Chlorine Institute
CISPI Cast Iron Soil Pipe Institute
CMAA Crane Manufacturers Association of America
CPSC Consumer Products Safety Commission
CRA California Redwood Association
CRSI Concrete Reinforcing Steel Institute
CTI Cooling Tower Institute
DBC Design Build Contractor, or Design Builder
DFPA Douglas Fir Plywood Association
EIA Electronic Industries Association
EPA U.S. Environmental Protection Agency
ETL Electronic Testing Laboratory
FM Factory Mutual Insurance Company
EXHIBIT 1 1080
FPS Fluid Power Society
FS Federal Specifications
GO 95 General Order No. 95, California Public Utilities Commission Rules for Overhead Electric Line Construction
GMP Guaranteed Maximum Price
HI Hydraulic Institute
HMI Hoist Manufacturers Institute
IAPMO International Association of Plumbing and Mechanical Officials IBR Institute of Boiler and Radiator Manufacturers
ICBO International Conference of Building Officials
IEEE Institute of Electrical and Electronic Engineers
IES Illuminating Engineering Society
IPCE International Power Cable Engineers Association
ISA Instrument Society of America
NAAMM National Association of Architectural Metal Manufacturers NBS National Bureau of Standards
NEC National Electric Code
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
NPDES National Pollutant Discharge Elimination System
NSF National Sanitation Foundation
OMM Operations and Maintenance Manual
OSHA Occupational Safety and Health Act
PCMAC Prestressed Concrete Manufacturers Association of California SMACNA Sheet Metal and Air Conditioning Contractors National Association SSPC Structural Steel Painting Council TCA Tile Council of America UBC Uniform Building Code
UPC Uniform Plumbing Code
UL Underwriters Laboratories
WCLIB West Coast Lumber Inspection Bureau
WIC Woodwork Institute of California
*** END OF SECTION ***
EXHIBIT 1 1081
SECTION 01200 - PROJECT MEETINGS
1.0 PRE-CONSTRUCTION CONFERENCE
The Construction Manager will schedule a pre-construction conference and organizational meeting at the project site or other convenient location upon award and/or execution of the Contract and prior to commencement of construction activities.
1.1 Attendees
The City, Design Consultant, Contractor and its superintendent, invited subcontractors, and other concerned parties shall each be represented at the conference by persons familiar with and authorized to conclude matters relating to the work.
1.2 Agenda
The Construction Manager will prepare an agenda for discussion of significant items relative to contract requirements, procedures, coordination and construction. The agenda may include, but may not be limited to:
1. Adequacy of distribution of Contract Documents.
2. Distribution and discussion of list of major subcontractors and suppliers.
3. Proposed progress schedules and critical construction sequencing.
4. Major equipment deliveries and priorities.
5. Project coordination.
6. Designation of responsible personnel.
7. Procedures and processing of:
a. Field decisions.
b. Proposal requests.
c. Submittals.
d. Change Orders.
e. Applications for Payment.
f. Record Documents.
8. Use of premises:
a. Office, construction, and storage areas.
b. OWNER's requirements.
9. Construction facilities, controls, and construction aids.
10. Shoring requirements and submittal of CONTRACTOR’s geotechnical report.
11. Temporary utilities.
12. Safety and first aid procedures.
13. Security procedures.
14. Housekeeping procedures.
EXHIBIT 1 1082
1.3 Minutes
Meeting minutes will be taken by the Construction Manager and distributed accordingly within fourteen (14) days. If the Contractor does not submit written objection to the contents of such minutes within seven (7) days after presentation to him, it shall be understood and agreed that the Contractor accepts the minutes as a true and complete record of the meeting.
2.0 PROGRESS MEETINGS
The Construction Manager will conduct progress meetings at the project site at regularly scheduled intervals which may be as frequent as weekly. Frequency of meetings are to be determined at the pre-construction conference.
2.1 Schedule
The dates, times and locations for the various meetings shall be agreed upon and recorded at the preconstruction conference. Subsequent changes to the schedule shall be by agreement between the Construction Manager and Contractor, with appropriate written notice to all parties involved.
2.2 Attendees
The City, Design Consultant, Construction Manager, Contractor, and its Superintendent shall each be represented at these meetings. Attendance by subcontractors, suppliers and other entities is subject to issues and/or items of the agenda which may, or may not, require attendance.
2.3 Agenda
Purpose of progress meetings: To expedite work of subcontractors or other organizations that are not meeting scheduled progress, resolve conflicts, and coordinate and expedite execution of the Work.
1. Review progress of the Work, Progress Schedule, narrative report, Application for Payment, record documents, and additional items of current interest that are pertinent to execution of the Work. Verify: Actual start and finish dates of completed activities since last progress meeting.
2. Durations and progress of activities not completed.
3. Reason, time, and cost data for Change Order Work that will be incorporated into Progress Schedule and application for payment.
4. Percentage completion of items on Application for Payment.
5. Reasons for required revisions to Progress Schedule and their effect on Contract Time and Contract Price.
EXHIBIT 1 1083
Discuss potential problems which may impede scheduled progress and corrective measures.
2.4 Minutes
Meeting minutes will be taken by the Construction Manager and distributed accordingly within fourteen (14) days. If the Contractor does not submit written objection to the contents of such minutes within seven (7) days after presentation to him, it shall be understood and agreed that the Contractor accepts the minutes as a true and complete record of the meeting.
3.0 CONFERENCES
At any time during progress of the Work, the City and the Construction Manager shall have the authority to require the Contractor and any subcontractor, suppliers, or service providers to attend job-site conferences. Any notice of such conference shall be duly observed and complied with by the Contractor and subcontractors, suppliers, or service providers without extra cost to the City.
4.0 POST CONSTRUCTION MEETING
The Contractor shall plan, and include in its bid, all costs for a post construction meeting, including the following:
The Contractor shall:
A. Meet with and inspect the Work 11 months after date of Substantial Completion with City and Construction Manager.
B. Arrange the meeting at least 7 days before meeting.
C. Meet in the City’s office or other mutually agreed upon place.
D. Inspect the Work and draft list of items to be completed or corrected.
E. Review service and maintenance contracts, and take appropriate corrective action when necessary.
F. Complete or correct defective work and extend correction period accordingly.
G. Require attendance of Superintendent, appropriate manufacturers and installers of major units of constructions, and affected subcontractors.
*** END OF SECTION ***
EXHIBIT 1 1084
SECTION 01210 - ALLOWANCES
1.1 GENERAL
A. Allowances are to be included as a separate line item of the specific amount in the applicable GMP.
B. Allowances shall be charged against for only the specific purposes detailed in the applicable GMP required by the Contract.
C. Allowances remaining at completion will be deducted from the applicable GMP by Change Order.
1.2 CASH ALLOWANCES
A. Each Allowance shall have its own accounting for the Cost of the Work to allow separate and distinct review of the amount spent under each allowance.
B. The adjustments in the GMP will be made if the Cost of the Work is more or less than the specified amount of the Allowance. The adjustment shall be the amount of the difference between the specified allowance and the Cost of the Work. The GMP will be adjusted by Change Order.
*** END OF SECTION ***
EXHIBIT 1 1085
SECTION 01300 - SUBMITTALS
1.0 GENERAL SUBMITTALS REQUIREMENTS
Schedule of Submittals. Contractor shall submit to City’s Representative a Submittal Schedule identifying all submittals requiring City review and approval for the current Phase within 14 days of Notice to Proceed for the applicable Phase.
Types of Submittals. Contractor shall be required to submit to City’s Representative for review and approval, as appropriate and as required by the City, the following types of submittals, including others not listed as may be required by the City’s Representative or Scope of Work to properly monitor the Project:
1. Construction Documents
2. Coordination Plan
3. Quality Control Plan
4. Acceptance Testing Plan
5. Test Reports, within seven (7) days of receipt by Contractor
6. All other plans and reports identified in the applicable scopes of work defined in Exhibits to Section 00500.
7. Operations Manual
8. Maintenance Manual
9. Process Control Narratives
Consistent with requirements of the Construction Documents, the following submittals shall also be made available for the City’s reference and, at City’s discretion, review:
10. Manufacturer's Instruction Manuals
11. Shop Drawings including actual field measurements
12. Product Data. One Submittal per Specification Section
13. Samples
14. Certifications (as applicable)
15. Record Drawings
16. Construction Photographs
17. As-programmed Process Control Narratives
18. Procurement documents for major equipment
2.0 SUBMISSION AND REVIEW
The City’s review of submittals will be for conformance with the design concept and the Contract.
They shall not be construed as permitting any departure from the Contract, as relieving the Contractor of responsibility for any errors, including details, dimensions, and materials, or as approving departures from details furnished by the City Representative. City Representative shall endeavor to compile and screen it’s comments prior to submittal to the Contractor and remove any comments which are not strictly a review for conformance with the Contract. The City shall be given adequate time to review the Contractor submittals and provide comments. In the case of submittals identified in paragraph 1.0 of this Section as being subject to City approval, a mutually agreed-to City review period shall be determined at the time of the submittal but shall be no greater than 14 days. For other submittals provide for review at City’s discretion, Contractor shall allow a minimum of 10 days for receipt of City review comments.
EXHIBIT 1 1086
City’s review of the Construction Documents shall not relieve Contractor from its responsibilities under this Contract, or be deemed to be an approval or waiver by City of any deviation from, or of Contractor's failure to comply with, any provision or requirement of the Contract Documents, unless such deviation or failure has been identified as such in writing in the document submitted for approval by Contractor and approved by City. Contractor shall provide City with a complete, accurate, and current set of as-built drawings prior to Final Completion.
Contractor shall be entitled to rely on the approvals of City with respect to the Design Materials. If City revokes, modifies or otherwise changes in a material way its approval of a given system after such system has been designed and approved, or modifies the original Scope of Work in a material manner requiring modification to one or more systems which have been designed and approved, Contractor shall be entitled to a Change Order in accordance with the provisions of this Agreement.
No Change Order shall be issued to the extent such modification is due to the fault or neglect of Contractor.
Prior to initiation of construction, Contractor shall prepare and submit to City a preliminary listing of all Shop Drawings and Product Data submittals anticipated by the Contractor. Contractor shall update the list of submittals periodically throughout the construction period.
City shall be provided access to all Shop Drawings and Product Data submittals and shall be provided reasonable opportunity to review such materials, including the final review comments prepared by Contractor’s design review personnel. Submittals shall be made available in an organized manner on the project website provided by Contractor. Test Reports shall be posted no later than seven (7) days after the test for testing performed by Contractor, or not later than seven (7) days after receipt of the report from an outside testing laboratory.
City’s review of Shop Drawings, Product Data, Test Reports and other construction-period submittals is intended to be a part of City’s independent quality assurance process and shall not be viewed as an additional layer or integral part of Contractor’s quality management procedures.
3.0 SCHEDULE OF VALUES
Submit to the Owner for acceptance, in the form directed by or acceptable to the Owner, a complete schedule of the values of the various portions of the Work to coincide with the construction schedule, including quantities and unit prices aggregating the Contract Price (except in cases and to the extent that accepted unit prices form the basis for payment). In the schedule, subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction and to coordinate with the progress schedule required for this Work. Provide support data to substantiate its correctness as required by the Owner. Include with each item in the schedule of values, its proper share of overhead and profit. An unbalanced breakdown providing for overpayment to the Contractor on items of Work which would be performed first will not be approved. The schedule of values, when accepted by the Owner, shall be used only as a basis for the Contractor's applications for payment and not for additions to or deductions from the Contract Price.
Provide the initial submittal for the schedule of values at the preconstruction conference as per Section 01200.
4.0 PROGRESS SCHEDULE
Refer Section 01310, Progress Schedule.
EXHIBIT 1 1087
5.0 SHOP DRAWINGS
Each submittal shall be complete with respect to dimensions, design criteria, materials, connections, bases, foundations, anchors, and the like, and shall be accompanied by technical and performance data as necessary to fully illustrate conformance with the Technical Specifications and Project Plans.
Provide the number of submittal sets as indicated in paragraph 2.0C of this Section.
A. Title Block and Identification On each shop drawing, provide a space for the Engineer's approval or correction stamp and a title block showing the following:
1. Name and address of Contractor.
2. Name and address of Subcontractor, manufacturer, supplier, or distributor, as applicable.
3. Name and address of Owner.
4. Date, scale of drawings, and identification number.
5. Revision date, number, and brief description.
6. Contractor's review and approval stamp.
7. Owner's Number.
8. Plan Reference and Specification Section reference.
9. Project Name.
B. Preparation and Size Details and information shall be clearly drawn, dimensioned, noted, and cross referenced. Unless otherwise approved, prepare shop drawings of the same size as the Contract Drawings or on 8-1/2 by 11 inch or 11 x 17 inch sheets as applicable. Maximum sheet size shall be 22 inches by 34 inches. Refer to Paragraph 2.0C above regarding use of a reproducible copy set for the larger drawings.
Submittal and record drawings shall be drafted and submitted in AutoCAD with two copies of half sheet drawings and a magnetic media copy on a CD.
C. Data Unless the following data is included in the instruction manuals or equipment data submitted prior to or with the shop drawings, submit with the shop drawings complete catalog and technical data for all manufactured products, materials, machinery, and equipment covered by the shop drawing submittal. Include data showing for each item, as applicable, the following information:
1. Manufacturer's specifications and details.
2. Applicable technical data and performance curves.
EXHIBIT 1 1088
3. Preparation, assembly, and installation instruction with allowable tolerances.
4. Connection requirements.
5. Pre-start-up servicing and operating methods.
6. Other data and information necessary to demonstrate that the proposed items conform to the Technical Specifications and Project Plans.
D. Information Required Shop drawings shall contain details and information fully developing the pertaining Technical Specifications and Project Plans requirements and such other information as may be specified or required for approval, including but not limited to:
1. Related work with cross references to applicable portions of the Technical Specifications and Project Plans.
2. Dimensions including variations between indicated dimensions and actual conditions.
3. Physical configurations with critical dimensions for clearance, access, and servicing.
4. List of materials including fasteners and connectors.
5. Structural construction and assemblies, welds shown by AWS symbols, and each fastener and connector shown by type and class.
6. Grouting work, including grouting space and material.
7. Concrete foundations and bases for machinery and equipment including joints, joint filler and sealer, and reinforcing.
8. Anchor bolt details showing type and class, sizes, embedments, projections, and locations measured with respect to permanent structural features. An anchor bolt template shall be shown on the Shop Drawings and shall be furnished unless waived in writing by the Owner.
9. Protective coatings and factory finishes fully described as to materials, number of coats, plated and metallic coating finishes, treatments, and similar information, all based on specified requirements. The term "as specified" is not acceptable for this purpose.
10. Machinery and equipment details. Standard catalog items need not be illustrated in detail, but indicate and detail sizes, supports, and connections.
11. Location of auxiliary items that are parts of machinery and equipment including sight glasses, petcocks, gauges, lubrication fittings and access, and maintenance monitoring devices.
12. Piping systems and piping including layout, fittings, valves, appurtenances, hangers EXHIBIT 1 1089
and supports, and sleeves.
13. Electrical equipment showing plans, elevations, sections, arrangements, materials, anchor bolts, supports, weights, wiring and circuit diagrams, internal connections, busses, grounding, conduit spaces, layout of instruments, gages, meters, and other components. Diagrams shall carry a uniform and coordinated set of wire numbers and terminal block numbers to permit cross-referencing between the contract document drawings, the drawings prepared by the Contractor’s installer, and equipment Technical Manual Drawings. Drawing number cross-referenced shall be provided.
14. Written descriptions fully describing the operation of all control circuits, start-up sequencing, shut down sequencing and alarms.
15. Underground duct banks showing typical details of conduits, joints, spacers, and means of securing conduits in place during concrete placement.
16. Dielectric connections, and materials and methods to be used to isolate aluminum from dissimilar materials.
17. Full-size lettering layouts for data plate and nameplate inscriptions.
E. Details and Connections Satisfactorily detail all connections required to complete the Work, including details necessary to make indicated or specified additions to existing work or to provide connections for future work. Design connections and parts of strength to withstand, without adverse deflection or stress, all loads or pressures to which they may be subjected and to develop the strength of the members or parts connected. In no case shall the connections, parts, or details be inferior to those required by the Technical Specifications or Project Plans.
F. Related Work The term "by others" is not acceptable for the description of related work shown in the shop drawings. Clearly note by name or description the Contractor, Subcontractor, or trade to provide such related Work; where such name or description is missing, it shall be understood and agreed that the Contractor is to furnish and install such related Work.
G. Clearances Do not proceed with any related Work that may be affected by piping, machinery, equipment, or other work therein until shop drawings and data showing all components with acceptable clearances have been approved.
H. Composite Shop Drawings With Installation Layouts Prepare and submit drawings, wherever specified or required, to resolve tight or conflicting field conditions. Show dimensional plans and elevations of the materials or equipment of all trades in the involved area or space, and include complete information as to arrangements, locations, clearances, avoidance of interferences, access, sizes, supports, connections, services, assembly, disassembly, and installation. Composite shop drawings and layouts shall be coordinated in the field by the Contractor and his Subcontractors for proper relationship to the Work of all trades, based on field conditions, and shall be checked and approved by them before submittal. Contractor shall have competent technical personnel readily available for such coordinating and checking.
EXHIBIT 1 1090
6.0 SAMPLES
Where samples are required in any of the following Specification Sections, unless otherwise specified, each sample submittal shall include two sets of samples. One set of approved samples and all disapproved samples shall be returned to the Contractor. Samples of value retained by the Owner shall be returned to the Contractor after completion of the Work if the Contractor's first transmittal of the sample requests its return. Approved samples of manufactured items returned to the Contractor may be installed in the Work if the location is recorded and the samples bear temporary identification as such.
A. Identification Label or tag each sample or set of samples identifying the manufacturer's name and address, brand name, catalog number, intended use and other data as required by these Specifications.
B. Colors, Patterns, and Textures For items required to be of selected and approved colors, patterns, textures, or other finish, submit sufficient samples to show the range of shades, tones, values, patterns, textures, or other features corresponding to the instructions and requirements specified.
C. Field-Applied Paint and Coatings: Submit samples of finishes at least 60 days prior to start of such finishing operations.
D. Factory Finish Colors: Colors of material specified to be furnished with a factory finish shall be the standard manufacturer colors, unless otherwise requested by City. Submit duplicate samples of factory finishes showing the full range of available colors for selection and approval when requested by the City.
7.0 MATERIALS LIST AND EQUIPMENT DATA
Within thirty (30) days after the Notice to Proceed, the Contractor shall submit a List of Materials to the Construction Manager for review. The List shall include all items of equipment and materials for mechanical, piping, architecture, electrical, heating and ventilating, equipment piping, and plumbing work; and the names of manufacturers with whom purchase orders have been or will be placed.
Items on the List shall be arranged in the same order as in these Specifications, and shall contain sufficient data to identify precisely the items of material and equipment the Contractor proposes to furnish. The List shall include the Specifications or Drawing references. After the submission is favorably reviewed and returned to the Contractor by the Construction Manager, it shall become the basis for the submission of detailed manufacturer’s drawings, catalog cuts, curves, diagrams, schematics, data, and information on each separate item for review as set forth elsewhere in the Contract Documents. The favorable review of shop drawings shall be obtained prior to the fabrication, delivery and construction of items requiring shop drawing submittal.
In determining acceptability, consideration shall be given to the availability of maintenance and replacement parts and materials, the availability of manufacturer's technical representatives, other factors that relate to the maintenance and repair of installed items without excessive inconvenience to the Owner, guarantees and warranties, as well as determination of conformance with the Technical Specifications and Project Plans.
A. Materials Furnished Under Standard Specifications For materials specified by reference to standard or reference specifications, prepare and submit for approval a list of such materials by EXHIBIT 1 1091
manufacturer's names and identifications to the extent requested by the Owner.
B. Material Lists Neatly bind submittal copies with sturdy labeled covers. Copies shall contain an index listing the contents. Loose submittals shall be returned un-reviewed. For each item listed, include the manufacturer's name and address, trade or brand name, local supplier's name and address, catalog numbers and cuts, brochures, terms and conditions of manufacturer's guarantee and warranty, other information to fully describe the item, and supplementary information as may be required for approval. Mark cuts, brochures, and data to indicate the items proposed and the intended use. Provide the number of submittal sets as specified in Paragraph 2.0C above.
C. Equipment Data Submit complete technical and catalog data for every item of mechanical and electrical equipment and machinery to be incorporated in the Work, including components.
Submittal copies shall be bound, indexed, and contain information as required in paragraph
7.0B for submittal of materials lists and shall further include specific information on performance and operating curves and data, ratings, capacities, characteristics, efficiencies, and other data to fully illustrate and describe the items as may be specified or required for approval, in particular, equipment incorporating logic circuits shall have a draft of a detailed theory of operation. Data shall be submitted in sets covering complete systems or functioning units. The number of submittal sets required shall be as specified in Paragraph 2.0C above.
D. Foreign Materials which are manufactured, produced or fabricated outside of the United States shall be delivered to a distribution point in Stockton, unless otherwise required in these specifications or the special provisions, where they shall be retained for a sufficient period of time to permit inspection, sampling, and testing.
Attention is directed to the provisions in Section 00700-6.5 Liquidated Damages. The Contractor shall not be entitled to an extension of time for acts or events occurring outside of the United States and it shall be the Contractor’s responsibility to deliver materials obtained from outside of the United States to the point of entry into Continental United States in sufficient time to permit timely delivery to the job site.
The Contractor, at no cost to the City, shall supply the facilities and arrange for any testing required in Stockton which the City is not equipped to perform. All testing by the Contractor shall be subject to witnessing by the City.
The manufacturer, producer or fabricator of foreign material shall furnish to the City a Certificate of Compliance. In addition, certified mill test reports clearly identifiable to the lot of material shall be furnished where required in these specifications or otherwise requested by the City.
8.0 VENDOR O&M MANUALS
The following minimum requirements shall be included in the Construction Documents specifying equipment and materials. More stringent requirements may be substituted at Contractor’s discretion.
A. Obtain data from the various manufacturers and submit instruction (Vendor Operation and Maintenance) manuals covering all mechanical and instrumentation equipment and machinery installed in the Work.
EXHIBIT 1 1092
B. Contents: Each manual shall have an index listing the contents. Information in the manuals shall include, as applicable, not less than:
1. General, introduction and overall equipment description, purpose, functions, and simplified theory of operation.
2. Specifications.
3. Installation instructions, procedures, sequences, and precautions, including tolerances for level, horizontal, and vertical alignment.
4. Grouting requirements including grout spaces and materials.
5. List showing lubricants for each item of mechanical equipment, approximate quantities needed per year, and recommended lubrication intervals; where possible, types of lubricants shall be consolidated with equipment manufacturers' approval to minimize the number of different lubricants required for plant maintenance.
6. Start-up and beginning operation procedures.
7. Operational procedures.
8. Shut down procedures.
9. Short and long term inactivation procedures.
10. Maintenance, calibration, repair and rebuild instruction.
11. Parts lists and spare parts recommendations.
12. Lists of all special tools, instruments, accessories, and special lifting and handling devices required for periodic maintenance, repair, adjustment, and calibration.
13. Wiring diagrams and detailed circuit operation description.
14. Performance curves and data.
15. Other information as may be specified or required for approval.
16. Electronic assembly drawings: Detailed circuit schematics, circuit board drawings, and chassis layouts shall be provided for all electrical and electronic equipment as part of the submittal, in accordance with what is normally available from the manufacturer. The circuit schematics, circuit board drawings, and chassis layouts shall clearly show, locate, and identify all components and component wiring. Circuit boards and circuit board components shall be identified by the original manufacturer’s name and part number.
Component values and tolerance shall be shown.
EXHIBIT 1 1093
17. In addition to the above information, the Contractor, with the assistance of the respective equipment manufacturer, shall complete and provide a Preventive Maintenance Task Sheet and Asset Management Data Sheet to include as part of the instruction manual for all equipment and machinery, as described in Contractor’s Phase 2 scope of Work.
C. Format and Organization
1. Use drawings and pictorials to illustrate the printed text as necessary to fully present the information.
2. Where information covers a family of similar items of equipment, identify the applicable portions by heavy weighted arrows, boxes or circles, or strike-out the inapplicable information. Non-conforming data are not acceptable and shall be returned for rework and resubmittal.
3. Incorporate into books all Manufacturers' Equipment Manuals including those specified in pertinent Sections of the Specifications. These books shall be organized by Equipment Class in same manner and sequence as the Specifications, i.e. Mechanical, Electrical, Instrumentation, etc. Book size and quantity shall be sufficient for inclusion of all data, and be of type and quality hereinafter specified in Paragraph 8.0D below.
4. Within each book of manuals, provide a Table of Contents for that book. If more than one book is necessary for a Class of Equipment, place a complete Table of Contents for that Class of Equipment within each book of that Class.
5. In addition, an overall Index of Contents shall be prepared in the same number of sets as required below for the final manuals and submitted separately to the City for his insertion in the Operation and Maintenance Manuals.
6. When a manufacturer's manual exceeds one inch in thickness and is bound as specified in Paragraph 8.0D it need not be rebound within another book, but the Overall Index shall refer to it by title and indicate that it is bound separately.
7. Drawings: Preprinted drawings provided by manufacturers of off-the-shelf equipment may be used if the drawings are an integral part of an offset printed O&M Manual, are not larger than 11-inches by 17-inches, are clearly legible when reproduced using conventional office copying machines, and, in the opinion of the City’s Representative, satisfy the requirement of these specifications. Those preprinted O&M Manual drawings, which are not acceptable, or which must be modified or corrected to show the actual asbuilt design, shall be redrawn as new specially-prepared shop drawings. Acceptable equipment manufacturer’s drawings incorporated into equipment operating and maintenance manuals need not be duplicated or removed from the manuals.
D. Manual Binding
1. Bind all materials in sturdy three-ring loose leaf binders designed to provide full view opening and ease of making content additions or replacements. Maximum binder size shall be three (3) inches, with this binder size containing not more than 21/2 inches of EXHIBIT 1 1094
material. Binders of smaller thickness shall contain correspondingly less material. All bound material shall be three-hole punched, loose material shall not be permitted.
2. Permanently label face of cover and bound edge of each book "MANUFACTURERS' INSTRUCTION MANUAL," and indicate Class of Equipment, i.e., Mechanical, Electrical, Instrumentation, etc. or name specific equipment if a single unit is contained.
E. Manual Submittals
1. Contractor shall coordinate schedule of submissions of the Draft and Final Manufacturer’s Instruction Manual(s) with the Subcontractor.
2. Subcontractors shall submit to Contractor one (1) digital (print-ready PDF) and four (4) complete hard copy sets of each “Draft” Manufacturer’s Instruction Manual, at least thirty (30) working days prior to the start of Factory Acceptance testing of the associated equipment.
3. The Draft Manufacturer’s Instruction Manual(s) shall be provided by the Contractor to the City. The City shall provide review comments on, or approval of, each manual no later than fifteen (15) working days after receipt of the Draft from Contractor.
4. Contractor shall compile and coordinate City’s comments with Contractor review comments prior to providing comments to Subcontractor for correction.
5. Subcontractor shall conform the Manufacturer’s Instruction Manual(s) to address the review comments and provide one (1) digital (print-ready PDF) and four (4) hard copy sets of the Final Manufacturer’s Instruction Manual(s).
6. When Contractor has confirmed all comments are addressed or received approval from City for deviation from certain requirements, the Contractor shall deliver one (1) digital (print-ready PDF) and four (4) hard copy sets of unmarked (without review comments) manuals to the City.
7. The Final Manufacturer’s Instruction Manual(s) shall be provided by Contractor to City prior to any startup and/or training activities on the associated equipment.
9.0 INSTALLATION INSTRUCTIONS
In addition to the instructions submitted under the above Section 8.0, submit copies of manufacturers' installation instructions for material and equipment incorporated in the Work to the extent specified in other Sections and Divisions of the Specifications or requested by the Owner for its review.
Installation instructions shall be reviewed for general adequacy only. After review, the Contractor shall distribute copies to all those involved with the instructions.
10.0 CITY PERSONNEL TRAINING PLAN
The Contractor shall submit a training plan at least fourteen (14) days prior to the start of any required City personnel training. Training plans shall describe the training course objectives, the scope of subjects to be covered, course outline including approximate time devoted to each subject, course materials to be provided by the Contractor, training aids to be used and training methods to be EXHIBIT 1 1095
used (lecture, demonstration, student practice, etc.). The submittal shall include resumes for instructors of each class demonstrating the instructor’s qualifications.
11.0 OTHER SUBMITTALS
Provide copies of other submittals such as calculations, manufacturer's certified reports, operational demonstration and system validation reports specified in other Sections and Divisions of the Specifications.
12.0 STORAGE INSTRUCTIONS
For each equipment and material item furnished, provide as part of the Shop Drawing submittal process the manufacturer's recommended instructions for storage of the respective equipment or material. The instructions shall address conditions both before installation and (for mechanical, electrical and instrumentation equipment) after installation but before placing into continuous operation.
13.0 TOOLS, ACCESSORIES, SPARE PARTS, AND MAINTENANCE MATERIALS Furnish and deliver all special tools, instruments, accessories, spare parts, and maintenance materials required by the Technical Specifications and Project Plans, and furnish and deliver the special tools, instruments, accessories, and special lifting and handling devices shown in the approved instruction manuals. Unless otherwise specified or directed, deliver the items to the City, with the Contractor's written transmittal accompanying each shipment, in the manufacturers' original containers labeled to describe the contents and the equipment for which it is furnished.
Provide spare parts and special tool lists. The list shall show the manufacturer’s/supplier’s name, address, and telephone number, the quantity of spare parts and special tools required for each item of equipment provided, and the current list price of each.
14.0 RECORD DRAWINGS
Maintain one record copy of all Drawings, Specifications, Addenda, Modifications, approved submittals, correspondence, and transmittals at the site in good order and readily available to the City.
Clearly and correctly mark and annotate the Record Drawings and Record Specifications to show all changes made during the construction process at the time the changed Work is installed.Revisions to the work will be recorded on a weekly basis.
A. Buried and Concealed Work: Record the precise location of all piping, conduits, ducts, cables, and like Work that is buried, embedded in concrete or masonry, or concealed in wood or metal framed walls and structures at the time such Work is installed and prior to concealment. Each feature of the concealed Work shall be accurately located by not less than two dimensions to permanent structures or using global positioning system (GPS) tools. The depth below finish grade, slab, or paving shall be noted for buried pipe, conduit, or ducts at the beginning and end of straight grade runs and at all grade change points, excepting sewer or drain lines run between manholes. Should the Contractor fail to record such buried or concealed Work, he shall uncover the unrecorded Work to the extent required by the City and shall satisfactorily restore and reconstruct the removed Work with no change in the Contract Price or the Contract Time. The record drawings shall indicate the locations of underground work such as utility lines and wet pipe utility lines permanently embedded in concrete slabs (floor and foundation).
EXHIBIT 1 1096
B. Delivery: Upon completion and prior to final inspection of the Work, and as a condition of final payment, submit the Record Drawings to the City for review, and make such revisions or corrections as may be necessary for them to be a true, complete, and accurate record of the Work in the opinion of the City. When approved, the Contractor shall deliver the Record Drawings to the City.
C. Format of Record Drawings: All drawings prepared in AutoCAD by Contractor shall be updated with the record information and provided to City in both AutoCAD and PDF formats.
In the final version of the Record Drawings, construction period changes shall not be graphically identified (e.g. with drawing clouds) except where deemed necessary by the Engineer of Record.
D. No new details that were not originally included on the construction drawings will be prepared. However, references to appropriate RFI’s will be incorporated as required.
15.0 PROCESS CONTROL NARRATIVES
Submit process control narratives (PCNs) to the City 6 weeks prior to beginning programming activities. Prepare additional drafts of PCNs based on city review comments. Prepare and submit “as-programmed” PCNs consistent with the schedule for Record Drawings.
16.0 CERTIFICATES
Each certificate required under the Contract or in any of the following Sections shall be signed by the individual, office, or agent lawfully authorized to execute the certificate, and such authority shall be cited in the certificate by title, description, or other acceptable evidence. All certificates shall be sworn as to the correctness and validity of the contents. Where specifically required in the respective section, certificates shall be notarized and duplicate copies of required certificates shall be notarized to be true copies.
17.0 EARTHQUAKE DESIGN AND RESTRAINT
Design, construct and attach all manufactured equipment supplied under this Contract, and as noted in the respective technical Sections, to resist stresses produced by seismic forces specified in this Section. Rigidly attach equipment that does not vibrate during normal operation. For equipment that vibrates during normal operation, attach by means of isolators with mechanical stops that limit movement in all directions unless it can be demonstrated by calculations that such stops are not required. Restrain equipment or portions of equipment that move during normal operation with mechanical devices that prevent displacement unless it can be demonstrated by calculations that such restraints are not required.
A. Work Included The work included in this Paragraph includes, but is not limited to, the following: All electrical equipment, cabinets and casework plus contents, electrical panels and lighting fixtures.
B. Minimum Earthquake Forces Except as provided herein, base calculations on the minimum earthquake forces prescribed for Essential Facilities by the 2010 California Building Code as published by California Building Standards Commission, 2525 Natomas Park Drive, Suite 130, Sacramento, CA 95833-2936.
EXHIBIT 1 1097
C. Include calculations with submittals of shop drawings, details and data specified in respective technical Sections of these Specifications. Calculations must bear the original seal and signature of a Professional Engineer or a Structural Engineer licensed in California and who provided responsible charge for the design.
18.0 CONSTRUCTION PHOTOGRAPHS
The Contractor shall provide construction photographs showing the regular progress of the work.
Photographs shall be made available on the project website.
Starting when the work begins and continuing for as long as the work is in progress, not less than 12 exposures consisting of different subjects or angles of view each time, shall be taken from different locations in the project at intervals not exceeding one month apart. At the beginning of the work and at six month intervals thereafter, at least four aerial photographs shall be taken. These aerial photographs shall be taken at an approximate scale or elevation agreed upon between the Contractor and the City’s Representative. Electronic file of each aerial photograph shall be posted to the project website.
19.0 REVISION OF SUBMITTALS
Whenever a contract change order causes a change to the information contained in previously approved submittals, submit information and data corresponding to the changed requirements for approval. Submit revisions following the procedure required for previously approved submittals. *** END OF SECTION ***
EXHIBIT 1 1098
SECTION 01310 - PROGRESS SCHEDULE
1.0 CONSTRUCTION SCHEDULE
Contractor shall prepare and submit to City for review projected construction schedules.
Update and revise schedules periodically to reflect progress of work. Contractor shall provide with its schedule a procedural outline of the system shutdowns and proposed tie-in procedures, which shall be subject to the favorable review of the City’s Representative.
1.1 General
The Progress Schedule for this Project will also be referred to as the CPM Schedule.
Neither the Contractor nor the City shall own the "float".
Any omission of work from the detailed schedule, otherwise required for Contract compliance, will not excuse the Contractor from completing such work within any applicable completion date.
1.2 Form of Schedules
1.2.1 Schedule and updates shall be prepared in the form of a network analysis system using the Critical Path Method.
1.2.2 The network analysis system shall consist of a detailed network, mathematical analysis and a network diagram.
a. The network diagram shall show the order and interdependence of activities and the sequence in which the work is to be accomplished as planned by the Contractor. The basic concept of a network analysis diagram will be followed to show how the start of a given activity is dependent on the completion of preceding activities and its completion restricts the start of following activities.
b. Detailed network activities shown on the network diagram shall include, in addition to construction activities, the submittal for approval of samples and shop drawings, the procurement of critical materials and equipment and their installation and testing. c. Related activities shall be grouped on the network. The activities on the critical paths shall be highlighted. The network shall be time scaled using units of approximately onehalf inch equals one week or other suitable scale approved by the Engineer. Weekends and holidays shall be indicated. Where float exists, the activities shall be shown at the earliest time they are scheduled to be accomplished.
d. The mathematical analysis of the network diagram shall include a tabulation of each activity shown on the detailed network diagram. The following information shall be furnished as a minimum for each activity.
1. Preceding and following event numbers.
EXHIBIT 1 1099
2. Activity description.
3. Estimated duration of activities in units of working days (being the best estimate available at time of computation).
4. Earliest start date (by calendar date).
5. Earliest finish date (by calendar date).
6. Scheduled or actual start date (by calendar date).
7. Scheduled or actual finish date (by calendar date).
8. Latest start date (by calendar date).
9. Latest finish date (by calendar date).
10. Float.
11. Responsibility for activity (Contractor, Subcontractors, suppliers, City). e. The mathematical analysis shall list the activities in sorts or groups as follows:
1. By the preceding event number from lowest to highest and then in the order of the following event number.
2. By the amount of float, then in order of activity number.
3. By responsibility in order of earliest start date.
f. System shutdown and tie-in dates must be identified and included on the schedule as milestones.
g. All activities of the City and the City’s Representative that affect progress and required contract dates for completion of all parts of the work shalle be included.
The selection and number of activities shall be subject to favorable review by the Construction Manager.
1.3 Review of System
Contractor shall participate in a review and evaluation of the proposed network diagrams and analysis by the City Representative. Revisions necessary as a result of this review shall be resubmitted to the City Representative within 3 days after the conference. Seven days will be allowed for checking and further action by the City Representative. The mutually acceptable schedule shall then be the schedule to be used by the Contractor for planning, organizing, directing and executing the Work and for reporting progress.
1.4 Updates
1.4.1 Submit monthly a report of the actual construction progress by updating the mathematical analysis and provide a narrative summary if requested by City. All contract EXHIBIT 1 1100
changes, including pending and approved change orders and field orders shall be included in the update schedule. Revisions causing changes in the detailed network shall be noted on the network or a revised issue of the affected portions of the detailed network furnished. The network shall be revised as necessary for the sake of clarity.
1.4.2 The report shall show the activities or portions of activities completed during the reporting period. The report shall state the percentage of the Work actually completed and schedule as of the report date and the progress along the critical path in terms of days ahead or behind the allowable dates. If the project is behind schedule, progress along other paths with negative float shall be reported. Percentage of work actually completed will be reviewed by the Engineer. Three copies of the report shall be submitted for each update.
1.4.3 Simultaneously submit a narrative report with the updated analysis which shall include but not be limited to a description of the problem areas, current and anticipated delaying factors, their impact, and an explanation of corrective actions taken or proposed.
1.5 Submittals
1.5.1 Submit with the Phase 2 Proposal a preliminary schedule.
1.5.2 Within 14 days after execution of the contract amendment for Phase 2, submit 3 copies of the complete network analysis system. After review, submit 3 copies of the mutually acceptable system.
1.5.3 Submit 3 copies of monthly reports and updates by the tenth day of the following month.
2.0 WEATHER CONDITIONS
Weather delays are as defined in Section 00700-6.3 Delays. Time extensions will be granted pursuant to Section 00700-6.4 Time Extensions only when the current critical activity is impacted. Contractor shall demonstrate, to the satisfaction of the City Representative, that a weather condition has delayed an activity on the critical path, as identified in the most recent schedule update. When weather days affecting the critical path occur, and are approved as such by the City’s Representative, the Contractor shall either:
a. Increase the duration of the current critical activity(ies) by the number of weather days experienced, or
b. Add a critical activity to the schedule to reflect the occurrence of the weather day(s).
3.0 RESERVED
4.0 TIME IMPACT ANALYSES
4.1 Requirement
When change orders impacting project duration are initiated, delays are experienced, or the Contractor desires to revise the schedule logic, the Contractor shall submit to the City’s EXHIBIT 1 1101
Representative a written Time Impact Analysis illustrating the influence of each change, delay, or Contractor request on the current contract schedule completion date.
4.1.1 Construction Schedule Analysis
a. Each Time Impact Analysis shall include a fragmentary network analysis demonstrating how the Contractor proposes to incorporate the change order, delay, or Contractor request into the Schedule.
b. The analysis shall demonstrate the time impact based on the date of occurrence of the change, delay or revision; the status of construction at that point in time; and the event time computation of all affected activities.
c. The event times used in the analysis shall be those included in the latest updated copy of the Construction Schedule or as adjusted by mutual agreement between the City’s Representative and Contractor.
4.2 Delays
Activity time delays will not automatically mean that an extension of Contract Time is warranted or due the Contractor.
a. It is possible that a strike or contract modification will not affect existing critical activities or cause noncritical activities to become critical, i.e., a strike or modification may result in only absorbing a part of the available total float that may exist within an activity chain of the network, thereby not causing any effect on the Contract completion date or time. b. The Contractor acknowledges and agrees that mitigation for delays due to changes, differing site conditions, and other causes will require revision of preferential sequences of the Work before proposing an updated schedule which supports a delay to the Project as a whole. When a delay to the Project as a whole can be avoided by revising preferential sequencing, and the Contractor chooses not to implement the revisions, the Contractor will be entitled to a time extension but is not entitled to compensation for indirect overhead. c. Float or slack shall not be for the exclusive use or benefit of the City or the Contractor.
Extensions of time for performance will be granted only to the extent that the equitable time adjustments for the activity or activities affected exceeds the total float along the activity chain involved at the time the change was ordered or the delay occurred. d. The definitions of "noncritical activities" and "total float" shall be as provided in the Associated General Contractors of America book "CPM in Construction, A Manual for General Contractors."
4.3 Submittal
Time Impact Analyses shall be submitted within fifteen (15) days after a delay occurs or with the Contractor's cost proposal in response to a notice of change from the City’s Representative. In cases where the Contractor does not submit a Time Impact Analysis for a specific change order, delay, or Contractor request within the specified period of time, then it is mutually agreed that the particular change order, delay, or Contractor request has no time impact on the Contract completion date and no time extension is required.
EXHIBIT 1 1102
a. Approval or rejection of Time Impact Analyses by the City’s Representative and the City will be made within fifteen (15) days after receipt of the Time Impact Analysis unless subsequent meetings and negotiations are necessary.
b. Upon mutual agreement by both parties, schedule revisions illustrating the influence of change orders, delays, and/or Contractor requests will be incorporated into the next schedule update.
5.0 WEEKLY ACTIVITIES PLAN
At each weekly progress meeting, the Contractor shall submit to the City’s Representative the Contractor's Plan of Activities for the following three weeks. The Plan of Activities shall describe the activity and location of the activity and include the Activity number as provided in the Construction Schedule.
6.0 RESERVED
7.0 RESERVED
*** END OF SECTION ***
EXHIBIT 1 1103
SECTION 01400 – QUALITY CONTROL
1.0 QUALITY CONTROL
All materials and equipment shall be new and of the specified quality and equal to the samples found to be acceptable by the Design Consultant if samples have been submitted. It shall be the duty of the Contractor to call the City Representative 's attention to apparent errors or omissions and request instructions before proceeding with the Work. The City Representative may, by appropriate instructions, correct errors and supply omissions not involving extra cost, which instructions shall be as binding upon the Contractor as though contained in the original Contract Documents.
At the option of the City Representative, materials and equipment to be supplied under this Contract will be tested and inspected either at their place of origin or at the site of the Work.
The Contractor shall give the City Representative written notification at least 30 days prior to the shipment of materials and equipment to be tested and inspected at point of origin.
Satisfactory tests and inspections at the point of origin shall not be construed as a final acceptance of the materials and equipment nor shall such tests and inspections preclude retesting or reinspection at the site of the Work.
Inspection of the Work by the City, City Representative and/or Design Consultant shall not relieve the Contractor of its obligations to conduct comprehensive inspections of the Work and to furnish materials and perform acceptable Work, and to provide adequate safety precautions, in conformance with the intent of the Contract.
2.0 INSPECTION
All work and materials are subject to the inspection of the City Representative. The Contractor shall notify the City Representative before noon of the working day before inspection is required. If the Specifications, the City Representative's instructions, laws, ordinances, or any public authority require any work to be specially tested or approved, the Contractor shall give timely notice, in writing, of its readiness for inspection. Unless otherwise determined by the City Representative, all inspections shall be done only in the presence of the City Representative or its authorized representatives. The City, City Representative, Design Consultant and authorized government agents and their representatives shall at all times be provided safe access to the Work wherever it is in preparation or progress and to all warehouses and storage yards wherein materials and equipment are stored, and the Contractor shall provide facilities for such access and for inspection, including maintenance of temporary and permanent access.
Inspection of the Work shall not relieve the Contractor of the obligation to fulfill all conditions of the Contract, and improper work will be subject to rejection. Work and materials not meeting such requirements shall be made good, and unsuitable work or materials may be rejected; notwithstanding that such work or materials have been previously inspected by the City Representative or that payment therefore has been included in a progress estimate.
No portion of any work or installed materials shall be covered or concealed in any manner whatsoever without first being inspected by the City Representative. If any work should be covered up without the approval or consent of the City Representative, the City Representative EXHIBIT 1 1104
shall have the authority to require that such work be uncovered for examination; defective work, if any, corrected; and recovered at the Contractor's expense.
3.0 SAMPLES AND TESTS
At the option of the City Representative, the source of supply of materials for the Work shall be subject to tests and inspection before the delivery is started and before such materials are used in the Work. Representative preliminary samples of the character and quality prescribed shall be submitted by the Contractor or producer of materials to be used in the Work in sufficient quantities or amounts for testing or examination.
All tests of materials furnished by the Contractor shall be made in accordance with the commonly recognized standards of national technical organizations, and such special methods and tests as are prescribed in the Contract Documents.
Certificates of compliance shall be provided by the Contractor as required in the Technical Specifications.
3.1 Sampling
The Contractor shall furnish such samples of materials as are requested by the City Representative, without charge. No material shall be used until the City Representative has had the opportunity to test or examine such materials. Samples will be secured and tested whenever necessary to determine the quality of the material. Samples and test specimens prepared at the jobsite, such as concrete test cylinders, shall be taken or prepared by the City Representative or Testing Firm in the presence and with the assistance of the Contractor.
3.2 Testing
Unless otherwise provided, all initial testing for concrete and soils shall be at no expense to the Contractor and shall be performed in the City's laboratory or in a laboratory designated by the City. Any retesting required due to failed test or defective material or sample shall be at the Contractor's expense. When required by the Contract or the City Representative, the Contractor shall furnish, at no extra charge, certificates of tests of materials and equipment made at the point of manufacture by a recognized testing laboratory.
The Contractor is responsible for all system and equipment testing as provided for in these Contract Documents.
3.3 Test Standards
All sampling, specimen preparation, and testing of materials shall be in accordance with the standards of nationally recognized technical organizations.
EXHIBIT 1 1105
The physical characteristics of all materials not particularly specified shall conform to the latest standards published by the American Society for Testing Materials, where applicable. *** END OF SECTION ***
EXHIBIT 1 1106
SECTION 01500 - CONSTRUCTION FACILITIES AND TEMPORARY
CONTROLS
1.0 GENERAL
The Contractor shall provide all temporary facilities and utilities required for prosecution of the work, protection of employees and the public, protection of the work from damage by fire, weather or vandalism, and such other facilities as may be specified or required by any legally applicable law, ordinance, rule, or regulation.
The Contractor shall respond to public complaints when requested by the City.
2.0 TEMPORARY UTILITIES
2.1 Electrical Service
The Contractor shall arrange, at its own cost, with the local utility to provide adequate temporary electrical service at a mutually agreeable location. The Contractor shall then provide adequate jobsite distribution facilities conforming to applicable codes and safety regulations. The Contractor shall provide, at its own cost, all electric power required for construction, testing, general and security lighting, and all other purposes whether supplied through temporary or permanent facilities. Electric power may be available for the Contractor’s use, on a site specific basis, and at the City’s sole discretion.
2.2 Water
The Contractor shall pay for and shall construct all facilities necessary to furnish water for its use during construction. Water used for human consumption shall be kept free from contamination and shall conform to the requirements of the State and local authorities for potable water. The Contractor shall pay for all water used for the Contractor's operations prior to final acceptance. The Contractor shall be responsible for the disposal of all water used in the course of construction in accordance with all local, state and national laws.
The Contractor shall provide all temporary pumping, piping, and appurtenances required to transport the water from the City identified locations to the final point of use. The Contractor shall be responsible for the disposal of all water used in the course of construction in accordance with all local, state and national laws
2.3 Temporary Lighting
The Contractor shall provide temporary lighting in all work areas sufficient to maintain a lighting level during working hours not less than the lighting level required by Cal/OSHA standards. As permanent lighting facilities are completed they may be used in lieu of temporary facilities, provided however, that bulbs, lamps, or tubes of such facilities used by the Contractor are in working condition at the time of final acceptance of the Work.
2.4 Heating and Ventilation
EXHIBIT 1 1107
The Contractor shall provide means for heating and ventilating all work areas as may be required to protect the Work from damage by freezing, high temperatures, weather, or to provide a safe environment for workers. Unvented direct fired heaters shall not be used in areas where freshly placed concrete will be exposed to the combustion gases until at least two hours after the concrete has attained its initial set.
2.5 Sanitary Conveniences
The Contractor shall provide suitable and adequate sanitary conveniences for the use of all persons at the site of the Work. Such conveniences shall include chemical toilets or water closets and shall be located at appropriate locations at the site of the Work. All sanitary conveniences shall conform to the regulations of the public authority having jurisdiction over such matters. At the completion of the Work, all such sanitary conveniences shall be removed and the site left in a sanitary condition.
3.0 CONSTRUCTION FACILITIES
Construction hoists, elevators, scaffolds, shoring, and similar temporary facilities shall be of ample size and capacity to adequately support and move the loads to which they will be subjected. Railings, enclosures, safety devices, and controls required by law or for adequate protection of life and property shall be provided.
3.1 Staging and Falsework
When required by Cal/OSHA standards, temporary supports shall be designed by a professional registered engineer with an adequate safety factor to assure adequate load bearing capability. If requested by the City’s Representative, the Contractor shall submit design calculations for staging and shoring prior to application of loads.
Excavation support shall be in accordance with Section 00700-4.12, Safety.
3.2 Temporary Enclosures
When sandblasting, spray painting, spraying of insulation, or other activities inconveniencing or dangerous to property or the health of employees or the public are in progress, the area of activity shall be enclosed adequately to contain the dust, over-spray, or other hazard. In the event there are no permanent enclosures of the area, or such enclosures are incomplete or inadequate, the Contractor shall provide suitable temporary enclosures.
The Contractor shall comply with the San Joaquin Valley Unified Air Pollution Control District regulations for such work.
3.3 Warning Devices and Barricades
The Contractor shall adequately identify and guard all hazardous areas and conditions by visual warning devices and, where necessary, physical barriers. Such devices shall, as a minimum, conform to the requirements of Cal/OSHA.
A. Hazards in public right-of-way:
Contractor shall:
EXHIBIT 1 1108
1. Mark at reasonable intervals, trenches and other continuous excavations in public right-of-way, running parallel to general flow of traffic, with traffic cones, barricades, or other suitable visual markers during daylight hours:
a. During hours of darkness, provide markers with torches, flashers, or other adequate lights.
2. At intersections or for pits and similar excavations, where traffic may reasonably be expected to approach head on, protect excavations by continuous barricades:
a. During hours of darkness, provide warning lights at close intervals.
3.4 Above Grade Protection
On multi-level structures the Contractor shall provide safety protection that, as a minimum, shall meet the requirements of Title 8, California Code of Regulations or Section 00700-
4.12, Safety.
3.5 Use of Explosives
All persons engaged in the activities of receiving, storing, using, handling or transporting any explosives must obtain a permit from the Fire Prevention Bureau; and all work shall be governed by the Health & Safety Code and any amendments or existing Articles of the National Board of Fire Underwriters Fire Prevention Code. The Contractor must notify the Construction Manager at least 14 days prior to the use of explosives
4.0 PROTECTION AND RESTORATION OF PROPERTY
The Contractor shall be responsible for the protection of public and private property at and adjacent to the Work and shall exercise due caution to avoid damage to such property. The Contractor is responsible for the following, at no additional cost to the City:
a. The Contractor shall conduct operations in a manner which will cause the least amount of damage, inconvenience and interference with the normal use of any public or private property. The Contractor shall repair or replace all existing improvements which are not designated for removal (e.g., curbs, sidewalks, survey points, fences, walls, signs, utility installations, pavements, structures, etc.) and are damaged or removed as a result of its operations. Repairs and replacements shall be at least equal to existing improvements and shall match them in finish and dimension.
b. Trees, lawns, and shrubbery that are not to be removed shall be protected from damage or injury. Remove all transplantable trees, shrubs and bushes that may be damaged or destroyed by construction and reset them after construction. If damaged or removed because of the Contractor's operations, they shall be restored or replaced as required to return the property to its prior condition and location, or better, as is reasonably possible. Lawns shall be re-sod, or re-seeded and covered with suitable mulch if appropriate sod is not available. c. The Contractor shall give reasonable notice to occupants or owners of adjacent property to permit them to salvage or relocate plants, trees, fences, sprinklers, and other improvements within the right-of-way which are designated for removal or would be destroyed because of the Work.
EXHIBIT 1 1109
d. To store his apparatus, materials, supplies, and equipment in such orderly fashion at the site of the Work as will not unduly interfere with the progress of his Work or the work of any other contractor.
e. To provide suitable storage facilities for all materials which are liable to injury by exposure to weather, theft, breakage, or otherwise. If the City determines that suitable storage for certain materials is not being provided, he may direct the Contractor to remove it from the job site, or to store it properly at the job site. f. To place upon the Work or any part thereof only such loads as are consistent with the safety of that portion of the Work.
g. In coordination with the appropriate authorities to probe, pot-hole, or otherwise ascertain the exact location of all existing underground improvements in advance of excavation such that no damage to these improvements will occur. In the event interferences in construction are encountered with the various existing improvements, the Contractor reserves the right to appropriately change the alignment and grade of the facilities.
h. Provide for the flow of all sewers and drains interrupted during the progress of the Work, in a manner acceptable to the City and immediately cart away and remove all offensive matter at no additional cost to the City.
Where interruption of existing utilities occurs as the result of the Contractor's activity for this Work, whether intentional or accidental, repairs to the interrupted utility shall be performed by the Contractor in a manner acceptable to the City unless instructed otherwise in these Contract Documents. The repairs, including materials used, shall be performed in accordance with the requirements of the respective utility as well as the requirements of the Contract Documents for this Project. Where a conflict exists between the requirements of the respective utility and those of the Contract Documents for this Project, the more stringent of the two shall apply unless instructed otherwise by the City.
5.0 PROJECT SECURITY
The Contractor shall make adequate provision for the protection of the Work area against fire, theft, and vandalism, and for the protection of the public against exposure to injury and shall comply the City's security measures.
5.1 Fire Extinguisher
Sufficient number of fire extinguishers of the type and capacity required to protect the Work and ancillary facilities, shall be provided and maintained in readily accessible locations. The local fire marshal shall have jurisdiction in determining the appropriate level of protection required.
5.2 First Aid
Post first aid facilities and information posters conforming to requirements of OSHA and other applicable Laws and Regulations in readily accessible locations.
EXHIBIT 1 1110
5.3 Temporary Fences
Except as otherwise provided, the Contractor shall enclose the site of the Work with a fence adequate to protect the Work and temporary facilities against acts of theft, violence, or vandalism.
In the event all or a part of the site is to be permanently fenced, this permanent fence or a portion thereof may be built to serve for protection of the Work site, provided however, that any portions damaged or defaced shall be replaced prior to final acceptance.
Temporary openings in existing fences shall be protected to prevent intrusion by unauthorized persons. During night hours, weekends, holidays, and other times when no work is performed at the site, the Contractor shall provide temporary closures or guard service to protect such openings. Temporary openings shall be fenced when no longer necessary.
6.0 ACCESS ROADS
Access roads shall be maintained to all storage areas and other areas to which frequent access is required. Similar roads shall be maintained to all existing facilities on the site of the Work to provide access for delivery of material and for maintenance and operation. Where such temporary roads cross buried utilities that might be injured by the loads likely to be imposed, such utilities shall be adequately protected by steel plates or wood planking, or bridges shall be provided so that no loads shall discharge on such buried utilities.
7.0 SPECIAL CONTROLS
The Contractor shall take all reasonable means to minimize inconvenience and injury to the public by dust, noise, diversion of storm water, or other operations under its control.
7.1 Dust Control
The Contractor at its expense shall take whatever steps, procedures, or means as are required to prevent abnormal dust conditions being caused by its operations in connection with the execution of the Work; and on any unpaved road which the Contractor or any of its subcontractors are using, excavation or fill areas, demolition operations, or other activities.
Control shall be by sprinkling, use of dust palliatives, modification of operations, or any other means acceptable to agencies having jurisdiction. Haul routes shall be kept visibly wet during excavation and hauling operations.
Unless the construction dictates otherwise, and unless otherwise approved by the City’s Representative, the Contractor shall furnish and operate a self-loading motor sweeper with spray nozzle at least once each working day to keep paved areas clean whenever construction, including restoration, is incomplete.
7.2 Mud Control
The Contractor shall: Prevent mud nuisance caused by construction operations, unpaved roads, excavation, backfilling, demolition, or other activities.
EXHIBIT 1 1111
7.3 Noise Abatement
Operations at the Worksite shall be performed so as to minimize unnecessary noise. Special measures shall be taken to suppress noise during night hours. Noise levels due to construction activity shall not exceed the levels specified by local ordinance.
Internal combustion engines used on the Work shall be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine shall be operated without said muffler.
7.4 Working Hours
Construction shall be allowed only between the hours of seven (7:00) a.m. and six (6:00) p.m. on weekdays, unless otherwise approved by the City.
Normal working hours are defined as between the hours of seven (7:00) a.m. and six (6:00) p.m. on weekdays.
The Contractor shall be responsible for any inspection and additional administration costs incurred by the City, or its agents and representatives, for work by the Contractor outside the hours defined above on weekdays, or any work on weekends or holidays recognized by the City, unless such working hours have been approved by the City. Such costs shall be withheld from the succeeding monthly progress payment. Any work in Section 01010, SUMMARY OF WORK, specifically required to be performed outside the normal working hours is excluded from the provisions of this paragraph.
The Contractor shall notify the Construction Manager at least 48 hours prior to any work outside the normal working hours defined above, on weekends or holidays. No work outside normal working hours will be allowed to take place without proper notification and approval by the construction manager.
7.5 Drainage Control
In all construction operations, care shall be taken not to disturb the existing drainage pattern whenever possible. Particular care shall be taken not to direct drainage water onto private property. Drainage water shall not be diverted to streets or drainage ways inadequate for the increased flow. Drainage means shall be provided to protect the Work and adjacent facilities from damage due to water from the site or due to altered drainage patterns from construction operations.
Temporary provisions shall be made by the Contractor to ensure the proper functioning of gutters, storm drain inlets, drainage ditches, culverts, irrigation ditches, and natural water courses.
7.6 Construction Cleaning
The Contractor shall, at all times, keep property on which work is in progress and the adjacent property free from accumulations of waste material or rubbish caused by employees or by the Work. The Contractor shall clean up not less than at the end of each work day, all refuse, rubbish, scrap materials, and debris caused by his operations, to the end that at all times the site of the Work shall present a neat, orderly and workmanlike appearance. More EXHIBIT 1 1112
frequent clean-up shall be performed as required to maintain access to all other City facilities still in operation.
All surplus material shall be removed from the site immediately after completion of the work causing the surplus materials. Upon completion of the construction, the Contractor shall remove all temporary structures, rubbish, and waste materials resulting from its operations.
Before final inspection of the work, the Contractor shall clean the project site, material sites, and all ground occupied by him in connection with the work of all rubbish, excess materials, false-work, temporary structures, and equipment. All parts of the work shall be left in a neat and presentable condition.
Nothing herein, however, shall require the Contractor to remove warning, regulatory, and guide signs prior to formal acceptance by the City.
7.7 Disposal of Material
The Contractor shall make arrangements for disposing of materials outside the Site and the Contractor shall pay all costs involved. The Contractor shall first obtain permission from the property owner on whose property the disposal is to be made and absolve the City from any and all responsibility in connection with the disposal of material on said property. When material is disposed of as above provided, the Contractor shall conform to all required Federal, State, and local regulations pertaining to such disposal.
7.8 Parking and Storage Areas
All stockpiled materials and parked equipment at the job site shall be located to avoid interference with private property and to prevent hazards to the public. Locations of stockpiles, parking areas, and equipment storage must be approved by the City’s Representative.
8.0 TRAFFIC REGULATION
8.1 General
The Contractor shall take all necessary steps to minimize inconvenience to the general public throughout all work under this Contract. No driveways or private roads shall be blocked without notifying the property owner and access must be restored during all non-working hours. Safe access must be maintained for pedestrian traffic throughout the work area at all times.
At least one lane of traffic in each direction must be kept open at all times unless prior approval is provided by the City and any affected agency. No roads shall be blocked or made inaccessible, due to the Contractor's work, without prior written approval of the City and the affected agencies.
The Contractor shall not block or obstruct fire lanes at any time.
EXHIBIT 1 1113
8.2 Haul Routes
Prior to the pre-construction conference, the Contractor shall submit for approval the proposed route(s) for all construction traffic on the project. This shall include any designated routes, if any, shown on the Contract Drawings. Upon approval, the Contractor shall strictly adhere to that route(s) only, unless written permission is obtained to change the route(s).
8.3 Traffic Control
When work is being performed on public streets or within the public right-of-way, traffic control shall be in accordance with the California Department of Transportation Traffic Manual. The Contractor shall submit for approval, by the City and any other applicable agency, its traffic control plans prior to work on public streets.
Traffic control shall include signs, warning lights, reflectors, barriers, and other necessary safety devices and measures, including sufficient flaggers to direct vehicular traffic through the construction areas.
No material or equipment shall be stored/parked where it will interfere with the free and safe passage of public traffic, and at the end of each day's work, and at other times when construction operations are suspended for any reason, the Contractor shall remove all equipment and other obstructions from the public right-of-way.
Should the Contractor appear to be negligent in furnishing warning and protective measures, as above provided, the City’s Representative may direct attention to the existence of a hazard, and the necessary warning and protective measures shall be furnished and installed by the Contractor.
9.0 PROJECT OFFICE
9.1 Accessibility of Records
The Contractor shall maintain on the project site a suitable office or other protected area in which shall be kept project copies of the Contract Documents, project progress records, project schedule, shop drawings, and other relevant documents which shall be accessible to the City and City’s Representative during normal working hours.
10.0 CONTRACTOR’S SAFETY RULES
The Contractor shall execute and abide by all terms and conditions of the City's "Contractor's Safety Rules," a copy of which is included at the end of this section. The Contractor shall post "Contractor's Safety Rules" on the job site for the entire construction period for this Project.
*** END OF SECTION ***
EXHIBIT 1 1114
CITY OF STOCKTON
DEPARTMENT OF MUNICIPAL UTILITIES
CONTRACTOR'S SAFETY RULES
THESE SAFETY RULES ARE TO INFORM YOU OF CERTAIN SAFETY AND HEALTH REQUIREMENTS THAT MUST BE FOLLOWED WHILE WORKING AT MUNICIPAL UTILITIES DEPARTMENT (MUD) SITES.
1. DRINK ONLY BOTTLED WATER. DO NOT DRINK FROM ANY FAUCET, PIPE LINE OR HOSE WHILE WORKING AT MUD SITES.
2. STRICT ADHERENCE TO CONFINED SPACE ENTRY PROCEDURES OUTLINED BY CAL-OSHA TITLE 8 ARTICLE 108 MUST BE FOLLOWED.
3. WASH HANDS THOROUGHLY BEFORE EATING OR DRINKING.
4. CHECK WITH THE CONTRACT MANAGER BEFORE BEGINNING ANY CONTRACTED WORK TO
REVIEW ANY SPECIAL HAZARDS OR SAFE PRACTICE PROCEDURES FOR THE AREA YOU ARE WORKING IN.
5. IT IS YOUR RESPONSIBILITY TO ADVISE YOUR WORK CREWS AND SUBCONTRACTORS
REGARDING HAZARDS AND SAFE PRACTICE MEASURES REQUIRED WHILE DOING ANY WORK AT MUD SITES. POTENTIALLY HAZARDOUS CHEMICALS ARE STORED AND USED AT MANY MUD SITES.
6. THE ABOVE RULES DO NOT EXEMPT ANY CONTRACTOR OR SUB-CONTRACTOR FROM ANY APPLICABLE FEDERAL, STATE OR LOCAL REGULATIONS.
THE ACKNOWLEDGMENT BELOW MUST BE SIGNED AND RETURNED TO THE CONTRACT MANAGER.
THANK YOU FOR YOUR COOPERATION.
I UNDERSTAND AND AGREE TO COMPLY WITH THE ABOVE RULES WHILE ON ANY MUNICIPAL UTILITIES DEPARTMENT SITE.
____________________________________ _________________________
CONTRACTOR'S SIGNATURE DATE
____________________________________
COMPANY NAME
EXHIBIT 1 1115
SECTION 01600 - MATERIAL AND EQUIPMENT
1.0 STORAGE OF MATERIALS AND EQUIPMENT
Materials and equipment shall be stored in such a manner as to ensure the preservation of their quality and fitness for the Work. Materials shall be placed on platforms or other hard, clean surfaces, and covered when necessary to ensure preservation of their quality.
Materials shall be stored so as to facilitate inspection. Storage areas shall be suitably fenced, if necessary to protect the public or the material.
Unless otherwise designated in the General Requirements, locations and arrangements for storage sites for materials and equipment outside the limits of work, shall be selected and maintained by the Contractor at its expense. Full compensation for furnishing such storage sites as may be necessary or required by the Contractor shall be considered as included in the lump sum price and no additional compensation will be allowed therefore. The City shall be specifically exempted in any agreement from any liability incurred from the use of private property for construction purposes. Use of portions of the City's area at the site for materials and equipment storage shall be permitted only upon the approval of the City’s Representative.
2.0 HAZARDOUS MATERIALS
The storage and handling of potential pollution causing and hazardous materials, including but not necessarily limited to, gasoline, oil and paint shall be in accordance with all local, state and federal requirements. All hazardous materials shall be stored and handled in strict accordance with the Material Safety Data Sheets for the products. Material Safety Data Sheets, shall be submitted to the City’s Representative prior to the delivery of materials to the project. Hazardous materials shall be removed and legally disposed as soon as no longer needed for project work. All spills of potential pollution causing and hazardous materials shall be contained, cleaned-up, removed and legally disposed, and remediated completely at no additional cost to the City.
*** END OF SECTION ***
EXHIBIT 1 1116
SECTION 01660 - SYSTEM TESTING
The Contractor shall test the facilities as specified in the City of Stockton Standard Plans and Specifications.
The Contractor shall provide all necessary facilities for conducting the tests, including but not limited to, personnel, power, water equipment, and chemicals. The Contractor shall provide the required minimum notice to the Construction Manager of its readiness and intent prior to each test. *** END OF SECTION ***
EXHIBIT 1 1117
SECTION 01670 - TRAINING
1.0 GENERAL
Conduct an instruction program for City's operation and maintenance personnel. Provide training for the purpose of familiarizing the City's personnel with the proper operation and maintenance of all equipment. Training shall include both classroom instruction and "hands-on" instruction held at the equipment.
Additional specific requirements for each type of equipment and/or system are identified in the Specification sections covering the various project equipment and/or systems.
2.0 INSTRUCTORS
Training for an individual component within a system shall be performed by the manufacturer’s factory-certified personnel. Training provided by the system fabricator, packager, integrator, or supplier shall be in addition to the component training.
Training instructors shall be trained and familiar with giving both classroom and hands-on field training.
3.0 SCHEDULING
Conduct training after the equipment has been installed, tested, and adjusted, and prior to City acceptance for beneficial occupancy or substantial completion of the respective equipment item, unless required earlier in the progress of the work the Specification section covering that equipment or system. Training shall be a prerequisite for acceptance.
Schedule instruction periods acceptable to the City, and provide formal written notice of the proposed instruction period at least fourteen (14) days prior to commencement of the instruction period. The City will review and comment on the proposed training schedule to accommodate scheduling of its shift personnel and ongoing or forecasted workload. The duration of the training sessions may vary from one hour up through multiple days, and should be based upon the complexity of the equipment involved and the training required.
For operation and routine maintenance instruction, three separate but identical training sessions for each respective equipment item or system shall be required (on different days or sets of days for multiple day sessions) to accommodate the scheduling of City’s shift personnel and City’s workload. For detailed maintenance and overhaul training, and for detailed troubleshooting, repair, and programming instruction for electrical and instrumentation equipment, two separate but identical training sessions (on different days or sets of days for multiple day sessions) shall be required for each respective equipment item or system.
4.0 INSTRUCTION PROGRAM
Instruction programs shall include basic system operation theory, troubleshooting, routine maintenance and repair, "hands-on" operation of equipment, and rebuild/overhaul procedures.
Provide copies of all training material (graphs, diagrams, cut-a ways, charts, descriptions, EXHIBIT 1 1118
instructions, etc.) used in the training sessions for the use of City's personnel in attendance and for insertion into the O&M manuals. All training material shall become the property of the City.
Instructors shall prepare a typed agenda for each training session and submit to City with the proposed training schedule twenty-one (21) days prior to the proposed commencement of the training period. City will review and comment on the adequacy of the proposed training and training schedule. Instructors shall obtain City approval of each training session agenda prior to the start of its respective session.
Training sessions, and their respective agendas, shall be organized into topic groupings to allow City to coordinate personnel attendance with the topics being taught. For example, operators do not need to attend overhaul training. Agenda shall also include a statement of the intended audience, list of major training topics, goals and objectives for each major training topic, and motivational statements (i.e. why is this important).
Training sessions shall cover the information required in the Operation and Maintenance manuals submitted in accordance with Section 01300 and the following topics, as applicable:
a. Operation, including theory of operation, start-up procedures, shutdown procedures, instrumentation and controls
b. Lubrication, including changing of major fluids
c. Operation safety
d. Emergency situation response
e. Troubleshooting
f. Preventive maintenance procedures
g. Optimizing life of equipment components
h. Maintenance, including adjustment and/or removal and replacement of wear components
i. Overhaul and repair, including takedown procedures, disassembly and assembly j. Programming
k. Record keeping
Training for overhaul and repair on mechanical equipment, and for troubleshooting, repair, and programming on electrical, instrumentation, and control equipment shall provide sufficient detail, duration, and quality to result in factory certification for City staff receiving such training, where factory certification is available. This training shall include an examination to determine the competency of the participating students. All tests shall be scored by the instructor and results submitted to the City. Certificates shall be issued by the manufacturer to those students demonstrating a level of competency acceptable to the manufacturer. The manufacturer/instructor shall anticipate training City staff to this level of detail as follows:
Mechanical Equipment Two separate sessions with four City maintenance staff in each session (separate days)
Electrical, Instrumentation and control Two separate sessions with four City maintenance staff in each session (separate days)
EXHIBIT 1 1119
5.0 LOCATION
All training shall be conducted at City facilities, except that training for factory certification in troubleshooting, repair, and programming of electrical, instrumentation, and control equipment may occur at the manufacturer's facility, at the manufacturer's option. Should the manufacturer choose to conduct this factory certification training at its facilities, the Contractor shall arrange for and pay all costs for travel, lodging, meals, and other associated expenses for City staff to travel to and from, and receive training at, the manufacturer's facility, at no additional cost to the City.
6.0 RECORDING OF TRAINING SESSIONS
Contractor shall record in color using DVD format, every session of the instruction program for each respective equipment item or system. Recording shall be performed by a person experienced in the operation of video recording equipment. Care shall be taken to properly place the camera, and provide adequate lighting and sound systems to ensure good video and audio quality. The final submitted DVD shall be subject to City approval and acceptance.
For video recording of "hands-on" training at the equipment, ambient noise shall be considered too loud to obtain satisfactory sound quality. For "hands-on" training sessions at the equipment, the recording shall be done without sound and the instructor shall dub a detailed narrative onto the recording by a means that will provide sound quality satisfactory to the City. Contractor shall propose a dubbing methodology to the City for approval prior to the first "hands-on" training session.
Contractor is not required to video record factory certification training that occurs at the manufacturer's facilities, but shall record any such training that occurs at City facilities.
Label each DVD identifying the session and respective equipment item or system. Multiple sessions of the same instruction program may be contained on the same DVD, but only one equipment item or system shall be recorded on the same DVD. The original and one copy of each DVD shall be submitted to the City within seven days following completion of each respective instruction program and any post-session dubbing. Responsibility for coordinating and providing all equipment, including video recorder and microphones, necessary to satisfactorily record each session, including all associated costs, shall be borne by the Contractor at no additional cost to the City.
*** END OF SECTION ***
EXHIBIT 1 1120
SECTION 01700 - CONTRACT CLOSEOUT
1.0 MANUALS
All applicable Manuals shall be submitted to, and approval by the City’s Representative obtained, prior to seventy-five (75%) percent of work being completed, or prior to the City taking beneficial occupancy of any equipment or facility. Incomplete or unacceptable Instruction Manuals as determined by the City’s Representative shall constitute justification for withholding all or any portion of progress payments.
2.0 EQUIPMENT START-UP
After all acceptance tests have been completed by the Contractor and City, but prior to final acceptance, the Contractor shall recheck all equipment for proper alignment, adjustment, and calibration, check oil levels, relubricate all bearing and wearing points, and in general assure that all equipment is in proper condition for regular continuous operation.
3.0 FINAL CLEANING
3.1 FINAL CLEAN UP
Before final inspection of the Work, the Contractor shall clean the construction area, material sites, adjacent property and streets, and all ground occupied by the Contractor in connection with the Work of all rubbish, excess materials, form lumber, etc. All parts of the Work shall be left in a neat and presentable condition.
3.2 Final Building Clean-Up
On all building projects and wherever else applicable, besides general broom cleaning, the following special cleaning shall be performed at completion of the Work:
a. Putty stains and paint shall be removed from glass; glass shall be washed and polished, inside and outside. Care shall be exercised so as not to scratch glass.
b. Marks, stains, fingerprints, and other soil and dirt shall be removed from painted, decorated, or stained work.
c. Waxed woodwork shall be cleaned and polished.
d. Hardware shall be cleaned and polished of all traces; this shall include removal of stains, dust, dirt, paints, and blemishes.
e. Spots, soil, paint, plaster, and concrete shall be removed from tile; tile work shall be washed afterwards.
f. Fixtures and equipment shall be cleaned, and stains, paint, dirt, and dust shall be removed.
EXHIBIT 1 1121
g. Temporary floor protections shall be removed; floors shall be cleaned, waxed, and buffed.
h. Dust, cobwebs, and traces of insects and dirt shall be removed.
4.0 PROJECT COMPLETION
4.1 SUBSTANTIAL COMPLETION
Substantial Completion is the date upon which written acceptance by the Owner has occurred stating that the construction of facilities is sufficiently completed in accordance with the Contract Documents, such that specific facilities can be utilized for the purpose for which they are intended, and the Owner thereupon takes beneficial occupancy of each facility.
4.2 FINAL COMPLETION
Final Completion is the date upon which written acceptance by the Owner has occurred stating that the Construction of all remaining Work as required by the Contract Documents, has been completed in accordance with the Contract Documents. The following items as they pertain to all remaining Work of the Project are included in the requirements which shall be completed prior to Final Completion being certified:
a. Removal and disposal of all non-salvageable materials, and clean-up of the project area.
b. Correction of all work deficiencies and/or non-compliance items. The punch list for the entire Contract shall be resolved to the Owner's satisfaction prior to Final Completion.
c. Written certification by the Contractor stating that all the above items have been accomplished and a request that the Owner accept the project as having attained "Final Completion.”
A. Submit following Closeout Submittals upon Substantial Completion or upon completion of the Work and at least 7 days prior to submitting Application for Final Payment:
1. Evidence of Compliance with Requirements of Governing Authorities.
2. Project Record Documents
3. Operation and Maintenance Manuals.
4. Warranties and Bonds.
5. Keys and Keying Schedule.
6. Evidence of Payment and Release of Liens and/or Stop Payment Notices as outlined in Conditions of the Contract.
7. Release of claims as outlined in Conditions of the Contract.
8. Survey Record Documents as specified in Section 01722.
9. Certificate of Final Completion.
4.3 PROJECT RECORD DOCUMENTS
A. Maintain at Project site, available to the City and Construction Manager, 1 copy of the Contract Documents, shop drawings, and other submittals in good order:
EXHIBIT 1 1122
1. Mark and record field changes and detailed information contained in submittals and change orders.
2. Record actual depths, horizontal and vertical location of underground pipes, duct banks, and other buried utilities. Reference dimensions to permanent surface features.
3. Identify specific details of pipe connections, location of existing buried features located during excavation, and the final locations of piping, equipment, electrical conduits, manholes, and pull boxes.
4. Identify location of spare conduits including beginning, ending, and routing through pull boxes and manholes. Record spare conductors, including number and size, within spare conduits and filled conduits.
5. Provide schedules, lists, layout drawings, and wiring diagrams.
6. Make annotations with erasable colored pencil conforming to the following color code:
Additions: Red
Deletions: Green
Comments Blue
Dimensions: Graphite
B. Maintain documents separate from those used for construction:
1. Label documents "RECORD DOCUMENTS."
C. Keep documents current:
1. Record required information at the time the material and equipment is installed and before permanently concealing.
D. Deliver record documents with transmittal letter containing date, Project title, Contractor's name and address, list of documents, and signature of Contractor.
E. During progress meetings, record documents will be reviewed to ascertain that changes have been recorded.
4.4 PUNCH LIST
When Contractor determines that all work included under this Contract for Phase 2, or a portion thereof, is substantially complete, it shall submit written notice of such finding to the City Representative. Within ten business days of receipt of said notice, City shall indicate a time and place for a “punch list” inspection. During the “punch list” inspection, the City shall inspect Contractor’s Work, and within ten business days of the inspection prepare a punch list as a convenience for Contractor for items not completed and work unacceptable to the requirements of the Contract Documents.
Upon receipt of the punch list, Contractor shall undertake all reasonable and timely steps to correct the punch list items to the City’s satisfaction. The Contractor shall make a diligent effort to complete all of the Work in conformance with the requirements of the Contract Documents before requesting a punch list. Corrections of items noted on the punch list do not relieve the Contractor from conforming with all requirements of the Contract Documents.
EXHIBIT 1 1123
5.0 GUARANTEE
The Contractor shall guarantee that the equipment, materials and workmanship furnished under this Contract, including all work and materials provided by subcontractors or manufacturers of packaged equipment components, will be as specified and will be free from defects for a one-year guarantee period, starting from the date of Substantial Completion of the Work, unless a longer period of time is prescribed by law or required by special provisions elsewhere in the Contract Documents and except as otherwise noted herein. In addition, the equipment furnished by the Contractor shall be guaranteed to be free from defects in design. The Contractor also agrees to indemnify, defend, and hold the City harmless from liability of any kind arising from damage due to said defects. The Contractor shall execute and submit a completed Warranty Form prior to the Substantial Completion date or the final acceptance of the project or within five (5) days of the occupancy or use of a portion of the Work, whichever is applicable.
If a specific item (or items) of equipment or material cannot be utilized by the City at Substantial Completion because the Work is incomplete or defective, the guarantee for that item (or items) shall begin when the City is provided beneficial use. Beneficial use for any such items shall be provided prior to Final Completion. In the event warranty work involves repair or replacement of parts, machine work, or any other work which affects the equipment or materials installed under this Contract, the Contractor's guarantee on such items and work shall be extended for a period of one year from the date of installation of said replacement items, or the performance of said repair or replacement work.
Within the guarantee period and upon notification of the Contractor by the City, the Contractor shall promptly make all needed adjustments, repairs or replacements arising out of defects, failure or abnormalities which, in the judgment of the City, become necessary during such period. The cost of all materials, parts, labor, transportation, supervision, special tools and supplies required for correction of defects, failure or abnormalities shall be paid by the Contractor and its Surety. If, within ten (10) days, unless specified otherwise by the City, after the City gives the Contractor notice of a defect, failure, or abnormality of the Work, the Contractor neglects to make the necessary repair or adjustments, the City may make the repair or adjustments or order the Work to be done by a third party, with the cost of the Work to be paid by the Contractor and its Surety. In the event of an emergency where, in the judgment of the City, delay would cause seriousloss or damage, repairs or adjustments may be made by the City, without giving notice to the Contractor, and the cost of the work shall be paid by the Contractor and its Surety.
The City and the Contractor agree that guarantee period on the parts of the work possessed and used by the City in accordance with Paragraph 00700-3.5, City's Right to Use or Occupy, shall commence on the date that the City takes possession of such work and so notifies the Contractor in writing. The City and Contractor further agree that such possession and use of the work shall not be deemed as Substantial Completion or acceptance of any other part of the Work.
Prior to the expiration of the guarantee period, the City reserves the right to hold a meeting and require the attendance of the Contractor. The purpose of the meeting is to review warranties, bonds and maintenance requirements and determine required repair or replacement of defective items.
EXHIBIT 1 1124
For the purpose of this Section, acceptance of the Work or a portion of the Work by the City, shall not extinguish any covenant or agreement on the part of the Contractor to be performed or fulfilled under this Contract which has not, in fact, been performed or fulfilled at the time of such acceptance. All covenants and agreements shall continue to be binding on the Contractor until they have been fulfilled.
*** END OF SECTION ***
EXHIBIT 1 1125
Attachment B to Amendment No. 1
Phase 2 Engineering Services
EXHIBIT 1 1126
Task 1: Project Management and Meetings
Hazen’s Design Manager will prepare monthly invoicing and status reports showing progress to date, project schedule update, and budget update. The Design Manager will coordinate activities with the design disciplines on a weekly basis throughout the design phase.
Hazen will attend scheduled project coordination meetings with the City’s project team over the course of the design. This will include up to three (3) virtual coordination meetings. Hazen will provide an agenda at least one (1) day prior to the meetings and provide meeting minutes within five (5) days of all meetings attended. In addition, Hazen proposes weekly conference calls with the City to provide an update on design progress and discuss any key decision points related to the project.
Task 1 Deliverables
The following deliverables will be provided for Task 1. Deliverables will be provided in electronic format unless otherwise noted.
• Monthly invoices and progress reports
• Meeting agendas, slides, and minutes
Task 2: Not Used
Task 3: Permitting
Hazen will provide assistance to the City for Permitting with DDW, including preparation of technical reports for the approval of a Domestic Water Supply Permit Amendment.
Given that DDW is ultimately responsible for permit issuance, Hazen does not guarantee that the City will receive a permit nor does Hazen guarantee the timing of permit receipt.
Hazen will prepare a draft and final Operations, Maintenance, and Monitoring Plan (OMMP) to submit to DDW. Hazen will also prepare a Startup, Commissioning, and Acceptance Test Plan. Both the OMMP and the startup plan will be reviewed with DDW.
Upon completion of startup, Hazen will prepare and Acceptance Test Report to be submitted to DDW.
Task 3 Deliverables
The following deliverables will be provided for Task 3. Deliverables will be provided in electronic format unless otherwise noted.
• Draft and final OMMP
• Final Startup, Commissioning, and Acceptance Test Plan • Final Acceptance Test Report
EXHIBIT 1 1127
Task 4: 100% Plans and Specifications
Hazen will prepare 100% submittals that include plans, specifications, and a draft cost model.
The final project design is anticipated to include the number of drawings listed below. • Four (4) General Drawings
• Five (4) Civil Site Drawings
• Two (7) Landscape Drawings
• Eight (5) Structural Drawings
• Seven (9) Mechanical Drawings
• Eleven (11) Electrical Drawings
• Seven (5) Instrumentation and Control Drawings
• Three (3) HVAC Drawings
Task 4 Deliverables
The following deliverables will be provided for Task 4. Deliverables will be provided in electronic format unless otherwise noted.
• 100% Design Submittal
o Bluebeam comment response for addressing City’s comments on 60% submittal
o Plans in electronic PDF form
o Three (3) full-size sets of printed plans
o Technical Specifications in electronic PDF form
o Three (3) sets of printed and bound technical specifications Task 5: Engineering Services During Construction
Hazen will provide engineering services during construction phase, including:
• Review of up to 80 shop drawings and submittals, including resubmittals. • Respond to up to a total of 15 Requests for Information. • Provide revisions to the construction drawings as directed by the City. Assumed a total of 24 hours of design time and 18 hours of engineering time. • Attend up to 8 construction meetings. Assumed each meeting is 1-hour duration. • Prepare a final as-built drawings.
• Provide assistance during start-up and testing. Assistance, at a minimum, will include participation by the electrical design engineer and process mechanical engineer. Assumed start-up and testing assistance for a 2-day period.
EXHIBIT 1 1128
Task 5 Deliverables
The following deliverables will be provided for Task 5. Deliverables will be provided in electronic format unless otherwise noted.
• As-Built Drawings
o Plans in electronic PDF form
o Three (5) full-size sets of printed plans
o Technical Specifications in electronic PDF form
o Three (5) sets of printed and bound technical specifications
EXHIBIT 1 1129
1130
City of Stockton
Legislation Text
File #: 22-1213, Version: 1
ADOPT RESOLUTION TO AUTHORIZE THE DOWNTOWN EAST-WEST CONNECTION
PROJECT
RECOMMENDATION
It is recommended that the City Council authorize staff to request funding for design from the California Transportation Commission and adopt a resolution to approve Notice of Exemption No.
NOE40-22 under the California Environmental Quality Act for the Downtown East-West Connection, Project No. WT22050/Federal Project No. ATPL-5008(199).
It is also recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this resolution.
Summary
The project will construct bicycle facilities and pedestrian improvements on Fremont Street, Oak Street, and Park Street between Pershing Avenue and Wilson Way (Attachment A - Vicinity Map).
The project will restripe the roadway to add bicycle facilities, upgrade sidewalk corners to Americans with Disabilities Act (ADA) standards, install speed cushions, rectangular rapid flashing beacons (RRFB), crosswalks, signal timing improvements, and new signage. The project was included in the 2021-26 Five-Year Capital Improvement Plan (CIP).
This project will receive both federal and State Active Transportation Program (ATP) funding. The National Environmental Protection Act (NEPA) and California Environmental Quality Act (CEQA) clearance is required and needed before staff can receive the next funding allocation for design from the California Transportation Commission (CTC). The project recently completed the environmental evaluation and documentation process and has been determined to be exempt under the CEQA Guidelines. The resolution will approve Notice of Exemption No. NOE40-22 under CEQA, enabling staff to request Plans, Specifications, and Estimates (PS&E) funding from the CTC for the Downtown East-West Connection, Project No. WT22050/Federal Project No. ATPL-5008(199). Caltrans will take the lead in providing NEPA clearance for this project. It is anticipated that the final plans and specifications be completed and advertised for construction in fall of 2024.
Staff recommends that Council authorize staff to request funding for design (PS&E) of the project from the CTC and adopt a resolution approving Notice of Exemption No. NOE40-22 under CEQA for the Downtown East-West Connection, Project No. WT22050/Federal Project No. ATPL-5008(199).
City of Stockton Page 1 of 2 Printed on 2/2/2023
powered by Legistar™
1131
File #: 22-1213, Version: 1
DISCUSSION
Background
Federal and State ATP funds are available for projects that encourage increased use of active modes of transportation. In 2020, Public Works submitted the Downtown East-West Connection grant application for the ATP Cycle 5 program. The project was awarded $1,799,460 in Regional ATP funds. Measure K funds will be used for the required local match. The project was included in the 2021-26 Five-Year CIP.
The project will construct bicycle facilities and pedestrian improvements on Fremont Street, Oak Street, and Park Street between Pershing Avenue and Wilson Way (Attachment A - Vicinity Map).
The project will restripe the roadway to add bicycle facilities, upgrade sidewalk corners to ADA standards, install speed cushions, RRFB, crosswalks, signal timing improvements, and new signage.
In March 2022, the CTC approved a funding allocation to the City for the Project Approval and Environmental Documentation phase. The ATP grant program requires the project obtain NEPA and CEQA clearance before the next request for PS&E funding can be submitted to the CTC.
Present Situation
The project recently completed the environmental evaluation and documentation process. The project is in conformance with the City’s General Plan, pursuant to California Government Code, section 65402, and is categorically exempt from the requirements of CEQA as specified under Section 15301(c) of the CEQA Guidelines. The activities related to this project constitute a discretionary project under the City’s jurisdiction and qualifies as a project that does not have a significant effect on the environment. The resolution will approve the filing of Notice of Exemption No. NOE40-22 under CEQA, enabling staff to request PS&E funding from the CTC for the Downtown East-West Connection, Project No. WT22050/Federal Project No. ATPL-5008(199). Caltrans will take the lead in providing NEPA clearance for this project. It is anticipated that the final plans and specifications be completed and advertised for construction in fall of 2024.
Staff recommends that Council authorize staff to request funding for design (PS&E) of the project from the CTC and adopt a resolution approving Notice of Exemption No. NOE40-22 under CEQA for the Downtown East-West Connection, Project No. WT22050/Federal Project No. ATPL-5008(199).
FINANCIAL SUMMARY
The Downtown East-West Connection, Project No. WT22050/Federal Project No. ATPL-5008(199), Account No. 4510-000-800007-300-000-30-45-000-000, is included in the adopted 2021-26 FiveYear CIP. ATP State funds in the amount $110,000 for Environmental Studies and Permits were allocated for the project in March 2022.
There is no impact to the City’s General Fund or any other unrestricted fund as a result of taking the recommended action.
Attachment A - Vicinity Map
City of Stockton Page 2 of 2 Printed on 2/2/2023
powered by Legistar™
1132
PROJECT __
LIMITS
VICINITY MAP
NOTTO SCALE
DOWNTOWN EAST-WEST CONNECTION
CITY PROJECT NO. WT22050 / FEDERAL PROJECT NO. ATPL-5008(199)
CITY OF STOCKTON
DEPARTMENT OF PUBLIC WORKS
ATTACHMENT A 1133
Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION APPROVING NOTICE OF EXEMPTION NO. NOE40-22 FOR THE DOWNTOWN EAST-WEST CONNECTION, PROJECT NO. WT22050/FEDERAL PROJECT NO. ATPL-5008(199)
The project will construct bicycle facilities and pedestrian improvements on Fremont Street, Oak Street, and Park Street between Pershing Avenue and Wilson Way.
The project will also restripe the roadway to add bicycle facilities, upgrade sidewalk corners to Americans with Disabilities Act standards, install speed cushions, rectangular rapid flashing beacons, crosswalks, signal timing improvements, and new signage; and This project will receive both Federal and State Active Transportation Program (ATP) funding. The ATP grant program requires the project obtain National Environmental Protection Act and California Environmental Quality Act (CEQA) clearance before the next request for Plans, Specifications & Estimates funding can be submitted to the California Transportation Commission; and
The project is in conformance with the City’s General Plan, pursuant to California Government Code, section 65402, and is categorically exempt from the requirements of CEQA as specified under section 15301(c) of the CEQA Guidelines, because this is a discretionary project under the City’s jurisdiction and qualifies as a project which has been determined to not have a significant effect on the environment; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The City Council authorizes staff to request funding for design from the California Transportation Commission for the Downtown East-West Connection, Project No. WT22050/Federal Project No. ATPL-5008(199).
2. The City Council approves the filing of Notice of Exemption No. NOE40-22 under CEQA for the Downtown East-West Connection, Project No. WT22050/Federal Project No. ATPL-5008(199), a copy of which is attached as Exhibit 1 and incorporated by this reference.
//
//
//
//
//
1134
3. The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED February 7, 2023 .
KEVIN J. LINCOLN II
ATTEST: Mayor of the City of Stockton
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
1135
EXHIBIT 1 1136
City of Stockton
Legislation Text
File #: 22-1130, Version: 1
ADOPT RESOLUTION TO AWARD A PROFESSIONAL SERVICES CONTRACT AND
APPROPRIATE FUNDING FOR THE COLUMBUS PARK RENOVATIONS PROJECT
RECOMMENDATION
It is recommended that the City Council adopt a resolution to:
1. Amend the Fiscal Year 2022-23 Annual Budget to appropriate additional funds from the State of California Department of Parks and Recreation Office of Grants and Local Services in the amount of $3,351,340 to the Columbus Park Renovations, Project No. WP22041, for the renovations of the Columbus Park.
2. Award a Professional Services Contract to Callander Associates, of Gold River, CA, in the amount of $352,064, for design of the Columbus Park Renovations, Project No. WP22041.
3. Approve findings pursuant to Stockton Municipal Code section 3.68.070 in support of an exception to the competitive bidding process.
It is recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this resolution.
Summary
Columbus Park, located at 401 West Worth Street, is approximately two acres. On December 14, 2020, a grant application for the Columbus Park Renovations project was submitted for Proposition 68 (2018 Bond Act) funding. The City was successful and was awarded $3,351,340.00 in Proposition 68 grant funds.
The approval of the 2020-21 California State Budget, Chapter 6, Statutes of 2020, Contract No.
C9803053, included a budget allocation item specific to the City of Stockton in an amount of $3,351,340 for the Columbus Park Renovations project.
The Columbus Park Renovations project will provide a new community garden, new playground and swing area, restroom, picnic shelter, bioswale, public art, adult fitness area, basketball courts, ADA pathway and lighting, and landscaping throughout the park.
On February 24, 2022, the City advertised a Request for Proposals (RFP) for design of the Columbus Park Renovations project. On March 23, 2022, the City received three proposals. A Selection Committee evaluated the three proposals and found Callander Associates of Gold River, CA, to be the most qualified and highest ranked firm.
City of Stockton Page 1 of 4 Printed on 2/2/2023
powered by Legistar™
1137
File #: 22-1130, Version: 1
Staff recommends that Council adopt a resolution to award a Professional Services Contract in the amount of $352,064 to Callander Associates for design services of the Columbus Park Renovations project.
Staff also recommends that Council adopt a resolution authorizing the City Manager to accept the grant award funding of $3,351,340 from the State of California Department of Parks and Recreation and make all necessary appropriations in compliance with and for the purpose stated in the grant applications.
DISCUSSION
Background
Columbus Park, located at 401 West Worth Street, is a two-acre park. Columbus Park includes halfcourt basketball and a few benches and tables (Attachment A - Vicinity Map). There are minimal activities and amenities to keep visitors of all ages active and engaged. Currently, it attracts homeless encampments and has become an illegal dumping ground. Renovation of the park is needed to meet the needs of the neighborhood.
Proposition 68 (2018 Parks Bond Act), formally known as the “California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018”, was passed by voters on June 6, 2018. This approval made funding available to the Statewide Park Development and Community Revitalization Program (SPP). The SPP received $650,275,000 from Proposition 68 to be distributed throughout multiple rounds of grant awards. The intent of this program is to create new parks and recreation opportunities in critically underserved communities across California.
On November 17, 2020, by Resolution No. 2020-11-17-1404-02, Council authorized the City Manager to submit a grant application for the Columbus Park Renovations project for the request of Proposition 68 grant funds. Potential improvements include: new community garden, new playground and swing area, restroom, picnic shelter, bioswale, public art, adult fitness area, basketball courts, ADA pathway and lighting, and landscaping throughout the park.
The City was successful in competing for the Proposition 68 grant funds and was awarded $3,351,340 for design and construction of the proposed park improvements (Attachment B- Grant Contract). The grant program is administered by the State of California Department of Parks and Recreation. Construction is anticipated to begin in 2024 and be completed by the end of 2024.
Present Situation
On February 24, 2022, the City advertised an RFP for design of the Columbus Park Renovations project. On March 23, 2022, three proposals were received from the following firms:
· Callander Associates (Gold River, CA)
· Gates Associates (Walnut Creek, CA)
· Siegfried Engineering, Inc. (Stockton, CA)
City of Stockton Page 2 of 4 Printed on 2/2/2023
powered by Legistar™
1138
File #: 22-1130, Version: 1
A Selection Committee comprised of Public Works and Community Services staff evaluated and ranked all proposals based on each firm’s understanding of work, experience with similar kinds of projects, staff qualifications, technical ability, project approach, cost, and local preference.
Callander Associates received the highest ranking, based on the noted criteria, and was determined to be the most qualified and highest ranked firm for this project. Staff negotiated a fee in the amount of $352,064 with Callander Associates for design of the Columbus Park Renovations project. The negotiated fee is approximately 11 percent of the estimated project cost, which is reasonable for a project of this type and complexity.
Staff recommends that Council adopt a resolution to award a Professional Services Contract in the amount of $352,064 to Callander Associates for design services of the Columbus Park Renovations project. Construction is anticipated to begin in 2024 and be completed by the end of 2024.
Staff also recommends that Council adopt a resolution authorizing the City Manager to accept the grant award funding of $3,351,340 from the State of California Department of Parks and Recreation and make all necessary appropriations in compliance with and for the purpose stated in the grant applications.
Findings
Pursuant to Stockton Municipal Code (SMC) section 3.68.070, Council may approve findings which support an exception to the competitive bidding process. These findings include:
1. The City does not have sufficient staff resources to perform the design required for this project.
2. Use of the RFP process is appropriate for this Professional Services Contract because it relies on the evaluation of professional qualifications and performance as the basis for selection of a vendor. Use of the criteria helps ensure selection of a vendor that will provide the highest quality professional service, which is in the public interest.
3. The City negotiated a contract following solicitation of competitive proposals in accordance with SMC section 3.68.070.A.3.
FINANCIAL SUMMARY
The Public Works Department will deliver the Columbus Park Renovations project. The following appropriations will provide sufficient funding to approve a contract in the amount of $352,064 with Callander Associates.
· Increase State Grant Revenue Fund, account number 0000-000-430201-300-000-00-00-000- 000-, in the amount of $3,351,340; and
· Appropriate Proposition 68 (2018 Parks Bond Act) funds in the amount of $3,351,340 to the Columbus Park Renovations, Project No. WP22041, account number 4540-000-800007-300- 000-30-45-000-000-.
City of Stockton Page 3 of 4 Printed on 2/2/2023
powered by Legistar™
1139
File #: 22-1130, Version: 1
There is no matching fund requirement for the project grant and no impact to the City’s General Fund or any other unrestricted fund as a result of taking the recommended actions.
Attachment A - Vicinity Map
Attachment B - Grant Contract
City of Stockton Page 4 of 4 Printed on 2/2/2023
powered by Legistar™
1140
VICINITY MAP
NOT TO SCALE
D CITYLIMIT
CJ COUNTY LIMIT
LEGEND
COLUMBUS PARK RENOVATIONS PROJECT,
CITY PROJECT NO. WP22041
CITY OF STOCKTON
DEPARTMENT OF PUBLIC WORKS
® PROJECT LOCATION
ATTACHMENT A 1141
DocuSign Envelope ID: 9A70037D-B79A-4865-829F-F46F9EOA7D79 GRANTEE City of Stockton
State of California - Natural Resources Agency
Department of Parks and Recreation
GRANT CONTRACT
2018 Parks Bond Act
Statewide Park Development and Community Revitalization GRANT PERFORMANCE PERIOD is from July 01, 2020 through June 30, 2025 CONTRACT PERFORMANCE PERIOD is from------- July 01, 2020 through ------- June 30, 2050 --------------- PROJECT TITLE COLUMBUS PARK RENOVATIONS PROJECT NUMBER SW-39-003 The GRANTEE agrees to the terms and conditions of this contract, and the State of California, acting through its Director of Parks and Recreation, pursuant to the State of California, agrees to fund the total State grant amount indicated below.
The GRANTEE agrees to complete the PROJECT SCOPE(s) as defined in the Development PROJECT SCOPE / Cost Estimate Form or Acquisition documentation for the Application(s) filed with the State of California.
The General and Special Provisions attached are made a part of and incorporated into the Contract.
Total State Grant not to exceed $3,351,340.00
City of Stockton
STATE OF CALIFORNIA
DEPARTMENT OF PARKS AND RECREATION
By Cristelle Fazeli
7009'!3Jgna\Fd'rlfof Authorized Representative
Address ________________ _
Title City Manager
Date
CONTRACT NO I AMENDMENT NO
C9803053
AMOUNT ENCUMBERED BY THIS DOCUMENT
$3,351,340.00
PRIOR AMOUNT ENCUMBERED FOR THIS
CONTRACT
TOTAL AMOUNT ENCUMBERED TO DATE
$3,351,340.00
Title
Date
Supervisor
5/3/2022
CERTIFICATION OF FUNDING
(For State Use Only)
FISCAL SUPPLIER I.D.
0000053090
FUND.
Drought, Water, Cln Air, Cstl Protc, Outdoor Fund
ITEM
3790-101-6088 I CHAPTER
6 Reporting Structured.
37900091 !
Account/Alt Account. I ACTIVITY CODE
5432000-5432000000 69807
I PROJECT NO.
SW-39-003
I
STATUT� I FISCAL YEAR
2021/22
I
PROJECT/ WORK PHASE
3790000SW39003
ATTACHMENT B
1142
DocuSign Envelope ID: 9A70037D-B79A-4865-829F-F46F9E0A7D79 I. RECITALS
This CONTRACT is entered into between the California Department of Parks and Recreation (hereinafter referred to as "GRANTOR," "DEPARTMENT" or "STATE") and City of Stockton (hereinafter referred to as "GRANTEE").
The DEPARTMENT hereby grants to GRANTEE a sum (also referred to as "GRANT MONIES") not to exceed $3,351,340 • subject to the terms and conditions of this CONTRACT and the 2020/21 California State Budget, Chapter 6, statutes of 2020, Item number - 3790-101-6088 (appropriation chapter and budget item number hereinafter referred to as "2018 Parks Bond Act, Statewide Park Development and Community Revitalization GRANT"). These funds shall be used for completion of the GRANT SCOPE(S).
The Grant Performance Period is from July 01, 2020 to June 30. 2025 II. GENERAL PROVISIONS
A. Definitions
As used in this CONTRACT, the following words shall have the following meanings:
1. The term "ACT" means the California Drought, Water, Parks Climate, Coastal Protection, and Outdoor Access for All Act of 2018, as referred to in section I of this CONTRACT.
2. The term "APPLICATION" means the individual project APPLICATION packet for a project pursuant to the enabling legislation and/or grant program process guide requirements.
3. The term "DEPARTMENT" or "ST A TE" means the California Department of Parks and Recreation.
4. The term "DEVELOPMENT" means capital improvements to real property by means of, but not limited to, construction, expansion, and/or renovation, of permanent or fixed features of the property.
5. The term "GRANTEE" means the party described as the GRANTEE in Section I of this CONTRACT.
6. The term "GRANT SCOPE" means the items listed in the GRANT SCOPE/Cost Estimate Form found in each of the APPLICATIONS submitted pursuant to this grant.
7. The term "GUIDE" means (1) the document identified as the "Grant Administration Guide for California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access For All Act of 2018 Competitive Grant Programs Capital Improvement Projects" and (2) The Application Guide that established the competitive procedures and policies for the selection of projects.
1 ATTACHMENT B
1143
DocuSign Envelope ID: 9A70037D-B79A-4865-829F-F46F9E0A7D79 B. Project Execution
1. Subject to the availability of GRANT MONIES, the STATE hereby grants to the GRANTEE a sum of money not to exceed the amount stated in Section I of this CONTRACT, in consideration of, and on condition that, the sum be expended in carrying out the purposes as set forth in the scope described in the enabling legislation and referenced in the APPLICATION, Section I of this CONTRACT, and under the terms and conditions set forth in this CONTRACT.
The GRANTEE shall assume any obligation to furnish any additional funds that may be necessary to complete the GRANT SCOPE(S).
The GRANTEE agrees to submit any change or alteration from the original GRANT SCOPE(S) in writing to the STATE for prior approval. This applies to any and all changes that occur after STATE has approved the APPLICATION. Changes in the GRANT SCOPE(S) must be approved in writing by the STATE.
2. The GRANTEE shall complete the GRANT SCOPE(S) in accordance with the time of the Performance Period set forth in Section I of this CONTRACT, and under the terms and conditions of this CONTRACT.
To maintain the integrity of the competitive grant program, the GRANTEE agrees that any other project changes or alterations which deviate from the intent of the project selection criteria provided by the GRANTEE in the original competitive APPLICATION must be submitted 1n writing to the STA TE for prior approval.
3. The GRANTEE shall comply with the California Environmental Quality Act (Public Resources Code, Section 21000, et seq., Title 14, California Code of Regulations, Section 15000 et seq.).
4. The GRANTEE shall comply with all applicable current laws and regulations affecting DEVELOPMENT projects, including, but not limited to, legal requirements for construction contracts, building codes, health and safety codes, and laws and codes pertaining to individuals with disabilities, including but not limited to the Americans With Disabilities Act of 1990 (42 U.S.C. §12101 et seq.) and the California Unruh Act (California Civil Code §51 et seq.).
C. Project Guide
1. GRANTEE agrees to abide by the GUIDES.
2. GRANTEE acknowledges that STATE may make reasonable changes to its procedures as set forth in the GUIDE. If STATE makes any changes to its procedures and guidelines, STATE agrees to notify GRANTEE within a reasonable time.
D. Project Administration
1. If GRANT MONIES are advanced for DEVELOPMENT projects, the advanced funds shall be placed in an interest bearing account until expended. Interest earned on the advanced funds shall be used on the project as approved by the STATE. If grant monies are advanced and not expended, the unused portion of the grant and any interest earned 2 ATTACHMENT B
1144
DocuSign Envelope ID: 9A70037D-B79A-4865-829F-F46F9E0A7D79 shall be returned to the STATE within 60 days after project completion or end of the Grant Performance Period, whichever is earlier.
2. The GRANTEE shall submit written project status reports within 30 calendar days after the STATE has made such a request. In any event, the GRANTEE shall provide the ST ATE a report showing total final project expenditures within 60 days of project completion or the end of the grant performance period, whichever is earlier. The Grant Performance Period is identified in Section I of this CONTRACT.
3. The GRANTEE shall make property or facilities acquired and/or developed pursuant to this contract available for inspection upon request by the STATE.
E. Project Termination
1. Project Termination refers to the non-completion of a GRANT SCOPE. Any grant funds that have not been expended by the GRANTEE shall revert to the STATE.
2. The GRANTEE may unilaterally rescind this CONTRACT at any time prior to the commencement of the project. The commencement of the project means the date of the letter notifying GRANTEE of the award or when the funds are appropriated, whichever is later. After project commencement, this CONTRACT may be rescinded, modified or amended only by mutual agreement In writing between the GRANTEE and the STATE, unless the provisions of this CONTRACT provide that mutual agreement is not required.
3. Failure by the GRANTEE to comply with the terms of the (a) GUIDE, (b) any legislation applicable to the ACT, (c) this CONTRACT as well as any other grant contracts, specified or general, that GRANTEE has entered into with ST ATE, may be cause for suspension of all obligations of the STATE unless the STATE determines that such failure was due to no fault of the GRANTEE. In such case, STATE may reimburse GRANTEE for eligible costs properly incurred in performance of this CONTRACT despite non-performance of the GRANTEE. To qualify for such reimbursement, GRANTEE agrees to mitigate its losses to the best of its ability.
4. Any breach of any term, provision, obligation or requirement of this CONTRACT by the GRANTEE shall be a default of this CONTRACT. In the case of any default by GRANTEE, STATE shall be entitled to all remedies available under law and equity, including but not limited to: a) Specific Performance; b) Return of all GRANT MONIES; c) Payment to the STATE of the fair market value of the project property or the actual sales price, whichever is higher; and d) Payment to the STATE of the costs of enforcement of this CONTRACT, including but not limited to court and arbitration costs, fees, expenses of litigation, and reasonable attorney fees.
5. The GRANTEE and the STATE agree that if the GRANT SCOPE includes DEVELOPMENT, final payment may not be made until the work described in the GRANT SCOPE is complete and the GRANT PROJECT is open to the public.
F. Budget Contingency Clause
If funding for any fiscal year is reduced or deleted by the budget act for purposes of this program, the STATE shall have the option to either cancel this contract with no liability occurring to the STATE, or offer a CONTRACT amendment to GRANTEE to reflect the 3 ATTACHMENT B
1145
DocuSign Envelope ID: 9A70037D-B79A-4865-829F-F46F9E0A7D79 reduced grant amount. This Paragraph shall not require the mutual agreement as addressed in Paragraph E, provision 2, of this CONTRACT.
G. Hold Harmless
1. The GRANTEE shall waive all claims and recourse against the STATE including the right to contribution for loss or damage to persons or property arising from, growing out of or in any way connected with or incident to this CONTRACT except claims arising from the concurrent or sole negligence of the STATE, its officers, agents, and employees.
2. The GRANTEE shall indemnify, hold harmless and defend the STATE, its officers, agents and employees against any and all claims, demands, damages, costs, expenses or liability costs arising out of the ACQUISITION, DEVELOPMENT, construction, operation or maintenance of the property described as the project which claims, demands or causes of action arise under California Government Code Section 895.2 or otherwise except for liability arising out of the concurrent or sole negligence of the STA TE, its officers, agents, or employees.
3. The GRANTEE agrees that in the event the STATE is named as codefendant under the provisions of California Government Code Section 895 et seq., the GRANTEE shall notify the STATE of such fact and shall represent the ST ATE in the legal action unless the STA TE undertakes to represent itself as codefendant in such legal action in which event the GRANTEE agrees to pay the STATE's litigation costs, expenses, and reasonable attorney fees.
4. The GRANTEE and the STATE agree that in the event of judgment entered against the STA TE and the GRANTEE because of the concurrent negligence of the ST ATE and the GRANTEE, their officers, agents, or employees, an apportionment of liability to pay such judgment shall be made by a court of competent jurisdiction. Neither party shall request a jury apportionment.
5. The GRANTEE shall indemnify, hold harmless and defend the STATE, its officers, agents and employees against any and all claims, demands, costs, expenses or liability costs arising out of legal actions pursuant to items to which the GRANTEE has certified.
The GRANTEE acknowledges that it is solely responsible for compliance with items to which it has certified.
H. Financial Records
1. The GRANTEE shall maintain satisfactory financial accounts, documents, including loan documents, and all other records for the project and to make them available to the ST ATE for auditing at reasonable times. The GRANTEE also agrees to retain such financial accounts, documents and records for five years following project termination or issuance of final payment, whichever is later.
2. The GRANTEE shall keep such records as the STATE shall prescribe, including records which fully disclose (a) the disposition of the proceeds of STATE funding assistance, (b) the total cost of the project in connection with such assistance that is given or used, (c) 4 ATTACHMENT B
1146
DocuSign Envelope ID: 9A70037D-B79A-4865-829F-F46F9E0A7D79 the amount and nature of that portion of the project cost supplied by other sources, and (d) any other such records that will facilitate an effective audit.
3. The GRANTEE agrees that the STATE shall have the right to inspect and make copies of any books, records or reports pertaining to this contract or matters related thereto during regular office hours. The GRANTEE shall maintain and make available for inspection by the STATE accurate records of all of its costs, disbursements and receipts with respect to its activities under this CONTRACT. Such accounts, documents, and records shall be retained by the GRANTEE for at least five years following project termination or issuance of final payment, whichever is later.
4. The GRANTEE shall use a generally accepted accounting system.
I. Use of Facilities
1. The GRANTEE agrees that the GRANTEE shall operate and maintain the property acquired or developed with the GRANT MONIES, for the duration of the Contract Performance Period.
2. The GRANTEE agrees that, during the Contract Performance Period, the GRANTEE shall use the property acquired or developed with GRANT MONIES under this contract only for the purposes of this grant and no other use, sale, or other disposition or change of the use of the property to one not consistent with its purpose shall be permitted except as authorized by the ST ATE and the property shall be replaced with property of equivalent value and usefulness as determined by the STATE.
3. The property acquired or developed may be transferred to another entity if the successor entity assumes the obligations imposed under this CONTRACT and with the approval of STATE.
4. Any real Property (including any portion of it or any interest in it) may not be used as security for any debt or mitigation, without the written approval of the STATE provided that such approval shall not be unreasonably withheld as long as the purposes for which the Grant was awarded are maintained. Any such permission that is granted does not make the STATE a guarantor or a surety for any debt or mitigation, nor does it waive the STATE'S rights to enforce performance under the Grant CONTRACT.
5. All real property, or rights thereto, acquired with GRANT MONIES shall be subject to an appropriate form of restrictive title, rights, or covenants approved by the STATE. If the project property is taken by use of eminent domain, GRANTEE shall reimburse STATE an amount at least equal to the amount of GRANT MONIES received from STATE or the pro-rated full market value of the real property, including improvements, at the time of sale, whichever is higher.
6. If eminent domain proceedings are initiated against GRANTEE, GRANTEE shall notify STATE within 10 days of receiving the complaint.
J. Nondiscrimination
5 ATTACHMENT B
1147
DocuSign Envelope ID: 9A70037D-B79A-4865-829F-F46F9E0A7D79
1. The GRANTEE shall not discriminate against any person on the basis of sex, race, color, national origin, age, religion, ancestry, sexual orientation, or disability in the use of any property or facility developed pursuant to this contract.
2. The GRANTEE shall not discriminate against any person on the basis of residence except to the extent that reasonable differences in admission or other fees may be maintained on the basis of residence and pursuant to law.
3. All facilities shall be open to members of the public generally, except as noted under the special provisions of this project contract or under provisions of the enabling legislation and/or grant program.
K. Severability
If any provision of this CONTRACT or the application thereof is held invalid, that invalidity shall not affect other provisions or applications of the CONTRACT which can be given effect without the invalid provision or application, and to this end the provisions of this CONTRACT are severable.
L. Liability
1. STATE assumes no responsibility for assuring the safety or standards of construction, site improvements or programs related to the GRANT SCOPE. The STATE'S rights under this CONTRACT to review, inspect and approve the GRANT SCOPE and any final plans of implementation shall not give rise to any warranty or representation that the GRANT SCOPE and any plans or improvements are free from hazards or defects.
2. GRANTEE will secure adequate liability insurance, performance bond, and/or other security necessary to protect the GRANTEE's and STATE'S interest against poor workmanship, fraud, or other potential loss associated with completion of the grant project.
M. Assignability
Without the written consent of the STATE, the GRANTEE'S interest in and responsibilities under this CONTRACT shall not be assignable by the GRANTEE either in whole or in part.
N. Use of Grant Monies
GRANTEE shall not use any grant funds (including any portion thereof) for the purpose of making any leverage loan, pledge, promissory note or similar financial device or transaction, without: 1) the prior written approval of the STATE; and 2) any financial or legal interests created by any such leverage loan, pledge, promissory note or similar financial device or transaction in the project property shall be completely subordinated to this CONTRACT through a Subordination Agreement provided and approved by the 6 ATTACHMENT B
1148
DocuSign Envelope ID: 9A70037D-B79A-4865-829F-F46F9E0A7D79 STATE, signed by all parties involved in the transaction, and recorded in the County Records against the fee title of the project property.
0. Section Headings
The headings and captions of the various sections of this CONTRACT have been inserted only for the purpose of convenience and are not a part of this CONTRACT and shall not be deemed in any manner to modify, explain, or restrict any of the provisions of this CONTRACT.
P. Waiver
Any failure by a party to enforce its rights under this CONTRACT, in the event of a breach, shall not be construed as a waiver of said rights; and the waiver of any breach under this CONTRACT shall not be construed as a waiver of any subsequent breach.
Title: __ Q1........,l�-------MAn_A_�._____ __
Date: __ Vl_/�JG�/�1"};�0�--
STATE OF CALIFORNIA
DEPARTMENT
�
OF PARKS AND RECREATION
DocuSigned by:
By: <::::::;;r ��
Signature of Authorized Representative
Title: Supervisor
Date: 5/3/2022 ---------------
7 ATTACHMENT B
1149
Resolution No.
STOCKTON CITY COUNCIL
RESOLUTION APPROPRIATING FUNDING AND AWARDING A PROFESSIONAL
SERVICES CONTRACT FOR THE COLUMBUS PARK RENOVATIONS, PROJECT NO. WP22041
On November 17, 2020, by Resolution No. 2020-11-17-1404-02, Council authorized the City Manager to submit a grant application for the Columbus Park Renovations, Project No. WP22041, for the request of Proposition 68 grant funds. The City was successful in competing for the Proposition 68 grant funds and was awarded $3,351,340 for design and construction of the proposed park improvements; and Additional appropriations are needed to accept grant award funding from the State of California Department of Parks and Recreation and make all necessary appropriations in compliance with and for the purpose stated in the grant applications; and On February 24, 2022, the City advertised a Request for Proposals for design of the Columbus Park Renovations, Project No. WP22041; and The project will provide a new community garden, new playground and swing area, restroom, picnic shelter, bioswale, public art, adult fitness area, basketball courts, ADA pathway and lighting, and landscaping throughout the park; and Callander Associates received the highest ranking and was determined by the Selection Committee to be the most qualified firm for this project; and Pursuant to Stockton Municipal Code (SMC) section 3.68.070, Council may approve findings which support an exception to the competitive bidding process; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF STOCKTON, AS FOLLOWS:
1. The City Council approves the increase of the State Grant Revenue Fund and the appropriation of Proposition 68 (2018 Parks Bond Act) funds in the amount of $3,351,340 to the Columbus Park Renovations, Project No. WP22041.
2. The City Council awards a Professional Services Contract between the City of Stockton and Callander Associates, in the amount of $352,064, and the City Manager is authorized and directed to execute same, a copy of which is attached as Exhibit 1 and incorporated by this reference.
3. The City Council approves findings pursuant to SMC section 3.68.070 in support of an exception to the competitive bidding process. These findings include:
1150
A. The City does not have sufficient staff resources to perform the design required for the project.
B. Use of the RFP process is appropriate for this Professional Services Contract because it relies on the evaluation of professional qualifications and performance as the basis for selection of a vendor. Use of the criteria helps ensure selection of a vendor that will provide the highest quality professional service, which is in the public interest.
C. The City negotiated a contract following solicitation of competitive proposals in accordance with SMC section 3.68.070.A.3.
4. The City Manager is hereby authorized to take whatever actions are necessary and appropriate to carry out the purpose and intent of this Resolution.
PASSED, APPROVED, and ADOPTED February 7, 2023 .
KEVIN J. LINCOLN II
Mayor of the City of Stockton
ATTEST:
ELIZA R. GARZA, CMC
City Clerk of the City of Stockton
1151
Professional Services Contract – CALLANDER ASSOCIATES – PROJECT NO. WP22041 (Updated 07/12/22)
A. Consultant represents that it is licensed in the State of California and is qualified to provide the services proposed in the SCOPE OF WORK section of this Contract.
B. City finds it necessary and advisable to use the services of the Consultant for the purposes provided in this Contract.
NOW THEREFORE, in consideration of the mutual promises, covenants, and conditions in this Contract, City and Consultant agree as follows:
1. SCOPE OF SERVICES. Subject to the terms and conditions set forth in this Contract, Consultant shall undertake and complete the services described in EXHIBIT A.
Consultant shall provide said services at the time, place, and in the manner specified in EXHIBIT A and compatible with the standards of the profession. Consultant agrees that it shall produce a fully complete project that is acceptable to the City.
2. COMPENSATION. City shall pay Consultant for services outlined in EXHIBIT A according to the fee not to exceed the schedule detailed in EXHIBIT B, which is attached to this Contract and incorporated by this reference. Consultant agrees this fee is for full remuneration for performing all services and furnishing all staffing and materials called for in the scope of services. The payments shall be made on a monthly basis upon receipt and approval of Consultant’s invoice. Total compensation for services and reimbursement for costs shall not exceed $352,064.00 or as otherwise mutually agreed to in a Contract Amendment.
3. INSURANCE. During the term of this Contract, Consultant shall maintain in full force and effect at its own cost and expense the insurance coverage as set forth in the attached EXHIBIT C and shall otherwise comply with the other provisions of EXHIBIT C.
4. INDEMNITY AND HOLD HARMLESS. With the exception that this section shall in no event be construed to require indemnification by Consultant to a greater extent than permitted under the public policy of the State of California, Consultant shall indemnify, and hold harmless City, its Mayor, Council, officials, and employees from and against any and all claims and causes of action which result in liabilities, judgments, awards, losses, damages, expenses, and costs (including reasonable attorneys’ fees, expert and consultant fees, and other expenses of litigation) including, but not limited to, death or injury to persons, or damage to property, which arise out of any violation of federal, state, or municipal law or ordinance, to the