STAFF REPORT:
The following addresses the concerns raised by Council and the public stemming from the July 15, 2025, Council hearing on the Project.
Parking
As originally stated in the July 15, 2025, Staff Report related to the Project, Assembly Bill 2097 (AB2097) generally prohibits imposing minimum parking requirements on most development projects located within one-half mile of a major transit stop. This law, which took effect January 1, 2023, applies to residential, commercial, and mixed-use developments, aiming to encourage transit-oriented development and reduce reliance on single-occupancy vehicles. By eliminating parking minimums near transit hubs, AB 2097 aims to: (1) reduce housing costs by allowing developers to build projects without the added expense of constructing parking spaces; (2) encourage the use of public transportation and reduce greenhouse gas emissions; and (3) promote denser, more walkable communities. This law is part of California's broader efforts to address housing affordability and environmental sustainability by reforming land use and transportation policies.
The Project site is located within one-half mile of the transit hub located at 177 Main Street, which serves Amtrak, Capitol Corridor, Solano County Transit, and Napa Valley Transportation Authority.
Further, the Metropolitan Transportation Commission (MTC), which is the regional transportation agency, designates the hub as a "major transit stop".
As it relates to minimum parking, the City may not impose, condition, or otherwise require a minimum specified number of parking spaces for the Project pursuant AB2097. To the extent that the greater Suisun Waterfront District may or may not need additional studying of parking capacity would be outside of the purview of the proposed Project. Therefore, the City would not be able to consider the perceived inadequacies of parking as a basis for consideration of the Project and to do so would be counter to the provisions of AB2097 and the State's mandates for additional infill housing development.
Quality of Life
During the July 15, 2025, "quality of life" primarily attributed to proximity of the Project to an area of regularly scheduled public events, was brought up. While events are frequently held in the immediate vicinity of the Project, the typical standards would apply to the Project that apply to any other Project throughout the City as it relates to noise and disturbance. While the Project would be near activities, such as festivals, music, markets, and holiday events, the Applicant would include disclosures to prospective tenants indicating the frequency of events. A condition of approval has been added to ensure that appropriate disclosures are included in so that tenants are aware of regularly scheduled events that may cause elevated periods of noise, and light.
Infill housing near activity is a common occurrence all over the world and could easily increase or 292
enhance ones "quality of life" just as easily as could be viewed as a negative. While living in or near a downtown area where noise and light is often increased beyond what might be found in a typical suburb, it provides a different type of housing variety to Suisun in providing housing that has views of the water, walkable to restaurants and services, and close to major highways.
Further, the Suisun Municipal Code establishes specific findings that shall be made by each entitlement.
These findings are the basis for approval and/or denial of Project and basing a decision outside of the confines of those findings, such as quality of life and/or parking constraints, could run afoul of the Government Code.
As outlined in the July 15, 2025 staff report, the above findings could be made; therefore, Staff and the Planning Commission recommended that Council approve the Project, subject to conditions of approval. The findings required for the Project do not speak to a quality of life per se, and moreover, would be speculative to make assumptions regarding quality of life of future tenants, especially when high density development, including near waterways, is common in many other communities that have waterfront development.
Therefore, while a quality of life as a broad discussion topic is acceptable, basing a decision on speculative quality of life concerns beyond the required findings above would be outside of the purview of what's legally required in Council's decision-making authority for the proposed Project.
Fencing
At the July 15, 2025, Council hearing, a question or concern was raised regarding the potential fencing of the property. However, to achieve the maximum number of units and based on the proposed Project's site plan, the structure is proposed at a zero-lot line, which means there are no setbacks or areas that could be fenced. Although the plans show porches/patios entering the ground-floor units, elevations indicate they aren't fully enclosed and, if approved, would need to be constructed per the plans.
However, to ensure that the property is not otherwise fenced as part of the Project, a condition of approval has been added.
Therefore, because the Project would be constructed based on what is proposed, including conditions of approval, fencing of the property would no longer be a concern.
Timing of Project
A question regarding the timing of the Project was raised and whether it was appropriate to consider the Project during an update to the Waterfront District Specific Plan. Absent of a moratorium or other legal mechanism to lawfully suspend the processing of development applications, to do so would be unlawful. Although the Waterfront District Specific Plan was contemplated, that in and of itself would not be a basis for suspending action on the proposed Project. As such, the existing adopted Specific Plan, including amendments, would continue governing development within its area.
Therefore, the Project application cannot be suspended or halted based on a desire to update to the Specific Plan.
Paint Color & Design
Several recent State laws, including the Housing Accountability Act, Government Code Section 65589.5; Government Code Section 65852.21 added by Senate Bill 9 (SB 9), which requires ministerial approval of two-unit developments; Accessory Dwelling Unit (ADU) law; and Density Bonus law require that cities apply objective standards to residential projects (including mixed-use projects for which 2/3 of the square footage is dedicated to residential use) and establish that a local agency cannot 293
disapprove a project that complies with applicable objective General Plan and zoning standards, including design review standards, unless it makes certain findings related to adverse impacts on public health or safety.
Government Code Section 65589.5 also prohibits cities from imposing conditions on affordable housing projects in a manner that render the project infeasible for affordable housing development, including through the use of design review standards, unless it makes certain written findings.
Objective design standards are defined by Government Code Sections 65589.5, 65913.4 and 66300(a) (7) as standards that involve no personal or subjective judgment by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the development applicant or proponent and the public official before submittal.
Although the Project is not anticipated to be deed-restricted affordable, it is a housing project defined under the Housing Accountability Act, which requires applying only objective design standards as defined above. Therefore, a city's ability to regulate or impose design standards, absent of adopted objective design standards, is severely limited. However, the Applicant has agreed and is willing to work Staff on exploring other paint schemes prior to finalizing plans. Staff has included a condition of approval to reflect the Applicant's willingness to voluntarily explore other color schemes that would better complement the Waterfront District.
2035 General Plan Consistency
It's important to underscore that the Project meets and/or exceeds many of the goals, and policies, of the 2035 General Plan (General Plan); thereby, helping to advance the broader vision of the City by providing much needed infill housing, and addressing the housing crisis. The General Plan identifies several guiding principals, goals, and policies to which the Project achieves, including the ones identified below.
As shown, the Project conforms to many of the goals and policies identified in the 2035 General Plan by providing infill housing at the waterfront, and near the train depot. Although the Project would not include parking, several of the policies encourage and prescribe the City to reduce or waive parking to advance housing goals and foster infill residential development.
Therefore, the Project would comply with the General Plan in that it achieves the goals and policies shown below and would add much needed housing to the City.
Guiding Principles
Focus higher density development and mixed-use projects in areas adjacent to the train/intermodal depot.
Strategically develop the Priority Development Area to provide convenient, attractive housing, shopping, services, and employment in the Downtown neighborhood.
Strategically develop vacant, under-utilized, and infill land throughout the City, and especially in Downtown.
Foster transit-oriented development around the train/intermodal depot.
Utilize sustainable development and land use practices that provide for today's residents and businesses while preserving choices for the community in the future.
Community, Character, and Design Element
Policy CCD-1.13: The City will maintain and enhance a strong pedestrian orientation in the Downtown Waterfront Specific Plan Area through the design of buildings, streets, and sidewalks. 294
Policy CCD-4.3: New developments shall provide direct access routes to buildings from sidewalks and parking areas for pedestrians and bicyclists.
Policy CCD-7.2: New developments should front onto adjacent parks and open space, or provide windows, outdoor seating areas or other orientation to these features.
Land Use Element
Objective LU-1: Allow incremental change in Suisun City's neighborhoods that accommodates demographic shifts and meets evolving resident needs.
Policy LU-1.1: The City will encourage reinvestment in existing buildings and development of vacant and underutilized properties within existing neighborhoods.
Policy LU-1.3: The City will guide land use change so that public gathering places, commercial services, recreational or other civic uses, and cultural destinations are within walking or biking distance, or accessible via public transit to as many Suisun City residents as feasible.
Objective LU-2: Increase commercial, visitor, and residential activity, including 1,200 new dwelling units within the City's Priority Development Area by 2035.
Policy LU-2.2: The City will encourage business and personal services, government and other civic uses, professional offices, and high-density residential uses to locate within the Priority Development Area.
Policy LU-2.3: The City will accommodate transit-oriented, mixed-use, residential and employment development within the City's Priority Development Area between present and 2035.
Policy LU-4.1: The City will support the provision of facilities, services, or infrastructure only in areas that are planned for development. The City will not induce growth by supporting the provision of services or infrastructure in areas that are not planned for development under the General Plan
Policy LU-4.6: The City will maintain development and infrastructure standards that promote infill development and allow lot consolidation for redevelopment, where necessary.
Policy LU-4.7: The City will support specific plans, redevelopment plans, corridor plans, and other small area plans that promote infill development and reinvestment.
Transportation Element
Policy T-6.11: The City will support transit-oriented development by reducing parking requirements and requiring improvements designed to encourage transit use in Transit Support Areas. Transit Support Areas include areas within ¼ mile walking distance of bus stops and the train depot.
Objective T-7: Reduce the proportion of parking spaces that are unused during the daytime, evenings, or weekends.
Policy T-7.2: The City will prioritize on-street parking, shared parking, and, where appropriate, public parking garages to meet parking needs for destination land uses and reduce the need for surface parking.
Policy T-7.3: New developments should optimize and make use of on-street parking spaces prior to proposing additional surface parking.
Policy T-7.4: The City supports shared parking between multiple uses to the extent possible, and will provide incentives for property owners to share underused off-street parking.
Policy T-7.9: The City may waive or relax off-site parking requirements for infill and affordable housing projects that use shared parking, on-street parking, and techniques to reduce vehicular travel demand.
Economic Development Element
Goal ED-5: Promote revitalization and redevelopment of the Downtown Waterfront Area and 295
other areas within infill development potential.
Policy ED-5.2: The City will encourage higher-density housing and office employment in the Downtown Waterfront Area, which will be required in order to expand the customer base and allow increased retail and commercial service uses.
2023-2031 Housing Element
Goal H-1 Housing Opportunities: Provide housing opportunities for all segments of the community to meet current and future needs.
Goal H-4 Housing Constraints: Reduce or remove governmental and nongovernmental constraints to the development, improvement, and maintenance of housing Policy H-1.2: Maintain land use policies that allow residential growth consistent with the availability of adequate infrastructure and public services.
Program 1.B Encourage Mixed-Use Projects and Residential in Commercial Zones. The City shall incentivize development of residential units in mixed-use projects and residential units in commercial zones, specifically focused in the Downtown Waterfront Specific Plan, and Commercial Mixed Use zones, by providing incentives, including, but not limited to:
Priority project processing
Deferral of development impact or permit fees, where possible Flexibility in development standards, such as parking, setbacks, and landscaping requirements
Density and intensity bonuses
Support for infrastructure upgrades
Assist developers with securing additional financing
Policy H-4.3: Provide streamlined processing of residential projects to minimize time and costs to encourage housing production.
2016 Waterfront District Plan
The most recent Suisun City Waterfront District Specific Plan (Specific Plan) was adopted November 2016, with amendments in 2018, to establish the framework for a more vibrant downtown. The proposed Project is consistent with the Specific Plan in that it represents infill development at the waterfront providing housing within proximity to the train depot. Further, the Specific Plan identifies the Commercial/Office/Residential (C/O/R) zone as envisioning residential uses as a permitted a stand alone use.
Therefore, the Project is consistent with and would comply with the Specific Plan and its vision for Downtown Suisun City.
Summary
In summary, based on the collective information in the July 15, 2025, City Council Staff Report, along with this Staff Report, the proposed Project would meet and/or exceed many of the goals, policies, and vision identified in the 2035 General Plan, 2016 Waterfront District Specific Plan (amended in 2018), and the 2023-2031 Housing Element. Therefore, Staff and Planning Commission recommend approval of the Project.
Environmental Review
California Environmental Quality Act (CEQA) Guidelines §15182 provides a specific exemption from additional environmental review under certain conditions. It is designed to streamline the CEQA process for qualifying residential projects that are consistent with a Specific Plan for which an Environmental Impact Report (EIR) has already been certified. The project must be residential, mixed-use residential, or residential in conjunction with public infrastructure and be consistent with a Specific Plan that has 296
already undergone environmental review via an EIR. Finally, the project must not cause new significant effects or require additional mitigation measures beyond what was analyzed in the EIR for the Specific Plan.
Proposed Conditions of Approval
In addition to the conditions of approval identified in the July 15, 2025, City Council Staff Report regarding the Project, the following conditions have been added for consideration that would be included in the original conditions of approval:
P-9 Applicant shall work with Development Services Staff to explore and potentially revise the color scheme of the Project to ensure consistency with the character of the waterfront. However, the overall materials and building features shall remain the same as shown in the Project plans, unless otherwise approved by the Development Services Director.
P-10 Applicant shall not erect any type of fence or barrier that would otherwise close off the property. If, in the future, the Applicant would like to modify elevations of the Project, including adding fencing, the Project would have to comply with approval processes identified in the Suisun Municipal Code.
P-11 Applicant voluntarily committed to exploring parking solutions for the Project with City Staff to potentially provide parking for the residents.
Required Findings for Planned Unit Development Permit Site Plan/Architectural Review In order for the City Council to approve a Planned Unit Development Permit and Site Plan/Architectural Review Permit, specific findings are required to be made. These findings assure consistency with applicable regulatory plans and compatibility with adjacent land uses and residents. Below are the required findings:
1 .
That the proposed project along with the proposed conditions under which it would be operated or maintained will be consistent with the Suisun City General Plan, Title 18 "Zoning" of the Suisun City Municipal Code, and the Waterfront Specific Plan 2 .
That the proposed project along with the proposed conditions under which it would be operated or maintained will be consistent with the General Plan. 3 .
That the proposed project will not be detrimental to the public health, safety, or welfare of persons residing or working in or adjacent to the neighborhood of such use, nor detrimental to properties or improvements in the vicinity or to the general welfare of the City. 4 .
That the proposed project is exempt from the California Environmental Quality Act per Section 15182 (Pursuant to a Specific Plan) (California Public Resources Code section 21000, et seq.) and the Guidelines thereunder (14 California Code of Regulations section 15000, et seq.) (collectively, "CEQA").
In evaluating the above findings, staff has determined each of the findings can be made by the City Council when taking into account the project description, Purpose and Intent of the General Plan Designation, the Waterfront District Specific Plan, as well as the proposed conditions of approval which are included as an exhibit to the resolution (Attachment 1).
STAFF RECOMMENDATION:
Staff and Planning Commission recommends that the City Council conduct a public hearing, for the proposed multi-family project at 400 Main Street; and 1 .
Adopt Resolution No. 2025 - ____: Approving Planned Unit Development Application No. PLN- 00003 and Site Plan/Architectural Review Application No. PLN-00004 for a Twenty-Unit Multi- Family Residential Project at 400 Main Street (Assessor Parcel Number (APN) 0032-091-220); and
2 .
Find the Project is Exempt from the California Environmental Quality Act (CEQA) Per Section 297
15182 for a Twenty-Unit Multi-Family Project Located at 400 Main Street (APN 0032-091-220).
DOCUMENTS ATTACHED:
1 .
Resolution
2 .
Project Application Materials
3 .
July 15, 2025 City Council Staff Report
4 .
Draft Project Disclosure Document
5 .
PowerPoint Presentation
PREPARED BY:
John Kearns, Principal Planner
REVIEWED BY:
Ricky Caperton, AICP, Development Services
Director
APPROVED BY:
Bret Prebula, City Manager
ATTACHMENTS:
1. 400 Main Street Resolution
2. 400 Main Street Application Materials.pdf
3. 400 Main Srreet July 15, 2025 City Council Staff Report.pdf
4. 400 Main Street Draft Disclsoure Document.pdf
5. 400 Main Street PowerPoint.pdf
298
RESOLUTION NO. 2025-___
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SUISUN CITY APPROVING PLANNED UNIT DEVELOPMENT NO. PLN-00003 AND SITE PLAN/ARCHITECTURAL REVIEW NO. PLN-00004 FOR A TWENTY-UNIT MULTI- FAMILY RESIDENTIAL PROJECT AT 400 MAIN STREET (APN 0032-091-220)
WHEREAS, the City Council considered Planned Unit Development PLN 25 -00003 and Site Plan/Architectural Review Application No. PLN 25 -00004 for the subject development application on August 19, 2025; and
WHEREAS, the City Council considered Planned Unit Development PLN 25 -00003 and Site Plan/Architectural Review Application No. PLN 25 -00004 for the subject development application and continued the item to its regular meeting of August 19, 2025; and
WHEREAS, the Planning Commission considered and reviewed Planned Unit Development PLN 25-00003 and Site Plan/Architectural Review Application No. PLN 25-00004 at its special meeting of June 11, 2025, and recommended City Council approval of the subject development project; and
WHEREAS, a report by City staff was presented and made a part of the record of the July 15, 2025, meeting; and
WHEREAS, the project applications were noticed as a Public Hearing and published in the Daily Republic on July 6, 2025, as well as posted in three public places and on the Suisun City website; and
WHEREAS, based on evidence presented at the meeting by City staff, the applicant, the Public and Council, the following Findings are hereby made:
1. That the proposed project along with the proposed conditions under which it would be operated or maintained will be consistent with the Suisun City General Plan, Title 18 “Zoning” of the Suisun City Municipal Code, and the Waterfront Specific Plan
2. That the proposed project along with the proposed conditions under which it would be operated or maintained will be consistent with the General Plan.
3. That the proposed project will not be detrimental to the public health, safety, or welfare of persons residing or working in or adjacent to the neighborhood of such use, nor detrimental to properties or improvements in the vicinity or to the general welfare of the City.
4. That the proposed project is exempt from the California Environmental Quality Act per Section 15 182 (Pursuant to a Specific Plan ) (California Public Resources Code section 21000, et seq.) and the Guidelines thereunder (14 California Code of Regulations sectio n 15000, et seq.) (collectively, “CEQA”).
NOW, THEREFORE, BE IT RESOLVED THAT the City Council of the City of Suisun City does hereby adopt Resolution No. 2025-___; A Resolution of the City Council of the City of Suisun City Approving Planned Unit Development No. PLN -00003 and Site Plan/Architectural Review No. PLN-00004 for a twenty-unit multi-family residential project at 400 Main Street (APN 0032-091-220), including the following conditions of approval:
299
GENERAL
G-1 The applicant or applicants successor in interest shall indemnify, defend and hold harmless the City of Suisun City it’s agents, officers, and employees from any and all claims, actions or proceedings against the City of Suisun City, its agents, officers, and employees to attach, set aside, void or annul, any approval by the City of Suisun City and its advisory agency, appeal board, or legislative body concerning this application which action is brought within applicable statutes of limitations. The City of Suisun City shall promptly notify the applicant or applicant’s successor in interest of any claim or proceedings and shall cooperate fully in the defense. If the City fails to do so, the applicant or applicant’s successor in interest shall not thereafter be responsible to defend, indemnify or hold the City harmless. This condition may be placed on any plans, or other documents pertaining to this application.
G-2 The use shall be constructed in accordance with the information presented (except as otherwise identified in the Conditions of Approval) and shall conform to all requirements of the City of Suisun City Code including but not limited to the Uniform Building Code as adopted by the City of Suisun City.
G-3 Approval of this permit will be effective, pr ovided no appeals are received within 10 calendar days of the City Council meeting date of ________ and that the property owner and the applicant signatures are obtained affirming that they have read and understand the Conditions of Approval for the Planned Unit Development Permit No. 25-6-001 and agree to comply with the conditions.
G-4 The applicant shall comply with all applicable Federal, State, and local codes including, but not limited to, the Uniform Building Code, Fire Code and County Health Department guidelines as interpreted by the County Health Inspectors.
G-5 All the proposed improvements, including landscape installation shall be completed prior to issuance of any business license or Certificate of Occupancy.
G-6 New development shall pay development impact fees set forth in Resolution 2017-02.
G-7 Applicant and City staff shall coordinate to provide a solution for residents choosing to park in the public parking lot west of project as currently there is a parking restriction between the hours of 2-5AM. This is to be accomplished through a parking maintenance agreement.
G-8 Applicant shall submit a project disclosure document which will address project specific conditions and is to be reviewed and approved by the Development Services Director.
FIRE
FIRE-1 Minimum fire flow requirements shall be in accordance with 2022 California Fire Code Appendix B.
FIRE-2 Fire standpipes are required in the stairwells of each floor.
PLANNING
P-1 The applicant is to provide a final landscape plan for the review and approval of the Development Services Director (or his/her designee).
P-2 Transformers, telephone switching boxes, utility poles, fire valves, trash enclosures, service areas as well as other utility or service functions shall be screened with landscape.
The emphasis shall be on reducing or eliminating negative visual impacts on major public areas, high priority buildings, prominent architecture elements, and along primary roadways.
P-3 The final color scheme and materials are to be approved by Development Services Director (or his/her designee).
P-4 Final architectural plans, responding to any comments raised at the ______ City Council meeting, need to be submitted and approved by the Development Services Director (or his/her designee).
P-5 A final photometric/lighting plan shall be submitted and approved by the Development 300 Services Director (or his/her designee) prior to building permit issuance.
P-6 All exterior lighting shall be downcast.
P-7 Construction of the project and use of the property shall be in substantial conformance with the approved plans including the project description. Any deviation will need to be submitted to the Development Services Director to determine whe ther further Planning Commission consideration is necessary.
P-8 Project applicant shall receive approval from the San Francisco Bay Development and Conservation Commission prior to issuance of any building permit.
P-9 Applicant will work with Development Services Staff to explore and potentially revise the color scheme of the Project to ensure consistency with the character of the waterfront.
However, the overall materials and building features shall remain the same as shown in the Project plans.
P-10 Applicant shall not erect any type of fence or barrier that would otherwise close off the property. If, in the future, the Applicant would like to modify elevations of the Project, including adding fencing, the Project would have to comply with approval proce sses identified in the Suisun Municipal Code.
P-11 Applicant voluntarily committed to exploring parking solutions for the Project with City Staff to potentially provide parking for the residents.
PUBLIC WORKS
PW-1 All work performed shall conform to these conditions as well as to all City ordinances, rules, standard specifications and details, design standards, and any special requirements imposed by the City Engineer. The Public Works Department will provide inspe ction to ensure conformance. Any deviation from the aforementioned documents shall require review and written approval by the City Engineer. Deviations or exceptions to the design requirements in the listed documents for private improvements must be identified in the design guidelines, or submitted to the City Engineer for approval.
PW-2 The Applicant shall agree, with respect to the new public improvements on this project, to either establish a community facilities district (CFD) or annex such property to an existing community facilities district, as deemed appropriate by the Applicant and the City, for the purpose of financing the cost of providing the following public services to the project property(ies): maintenance of public street lighting, sanitary sewer, storm drains and public infrastructure. The rate and method of apportionment of special tax applicable to the property shall establish a special tax designed to offset public services per City Council Resolution 2005-70. The City shall not be obligated to issue certificates of occupancy with respect to the property until formation of the new community facilities district or annexation to an existing community facilities district is completed.
PW-3 The City Engineer may approve and/or negotiate mino r changes or exceptions to Public Works Department conditions of approval.
PW-4 The Applicant shall designate a design professional as the main point of contact in submitting plans, reports and other documents to the City during the design and plan review phase. Submittals from any other person will not be accepted by the City.
PW-5 The Improvement Plans shall include a General Note that: any revisions to the approved Improvement Plans and/or City Standards, including those due to field conditions, shall require review and written approval by the City Engineer. The Applicant shall have the revised plans prepared by the Project Professional Designer and shall have the revised plans submitted for review and approval by the City Engineer. Any revisions to the Improvement Plans resulting from these or other conditions contained herein shall be subject to written approval of the City Engineer.
PW-6 The Improvement Plans shall include a Site Improvement Plan prepared by a registered Civil Engineer and shall comply with the requirements of the soils report for the project.
PW-7 Building foundations shall comply with Suisun City’s Ordinance No. 729 and the most current Building Code. 301
PW-8 The Applicant shall pay all Public Works fees, including plan review and inspection fees, as established by the City Public Works Fee Schedule at the time of submittal of Improvement Plans.
PW-9 The Applicant shall pay Suisun-Solano Water Authority (SSWA) plan check and inspection fees within 30 calendar days upon receipt of inv oice from the Solano Irrigation District (SID). The invoice will be for actual expenses incurred by SSWA for providing plan checking and inspection services for the project.
PW-10 Developer shall submit his Faithful Performance Bond and Labor & Materials Bond prior to the approval of Improvement Plans. Developer shall submit his One -Year Warranty Bond prior to the City’s acceptance of the improvements. The amounts of the Faithful Performance Bond and Labor & Materials Bond shall each be 100% the cost e stimate of the civil and landscape improvements, while the amount of the One-Year Warranty Bond shall be 20% of the cost estimate of the civil and landscape improvements.
PW-11 The Applicant shall obtain all necessary permits from all applicable agencies prior to start of construction.
PW-12 Dumpsters for use during construction shall be dumpsters supplied by Republic Services.
This is pursuant to the agreement between the City and Republic Services for all areas within Suisun City. Dumpsters shall be scr eened from public view by a City -approved method and shall be covered at all times after work hours.
PW-13 All work within the public right -of-way, which is to be performed by the Applicant, the general contractor, and all subcontractors shall be included within a single City Encroachment Permit issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.
PW-14 The Applicant shall have a superintendent present at all times at the job site.
Superintendent shall provide the quality control for the Applicant; respond to the City’s concerns; coordinate inspections with the City Inspector; make construction decisions on behalf of the Applicant; and coordinate work of the Applicant’s subcontractors.
PW-15 A sign shall be posted on the property in a manner consistent with the public hearing sign requirements, which shall identify the address and phone number of the Applicant and/or Applicant’s representative for the purposes of responding to questions and complaints during the construction period. Said sign shall also indicate the hours of permissible construction work.
PW-16 Prior to start of construction, a security fence, the height of which shall be the maximum permitted by the Zoning Ordinance, shall be installed and maintained around the perimeter of the lot. The lot shall be kept clear of all trash, weeds, and unu sable construction material throughout the construction activity.
PW-17 Unless otherwise approved by the City Engineer, all existing sidewalks shall be kept clear and passable during all phases of the project.
PW-18 Any existing wells shall be abandoned per County of Solano Health Department standards prior to development of the property. Owner shall submit documentation to the Public Works Director that this condition has been satisfied prior to any construction on this project.
PW-19 If any archaeological resources are found during the grading of the site or during performance of any work, work shall be halted, the City Engineer shall be notified and a certified archaeological firm shall be consulted for advice at Applicant’s expense.
PW-20 Any relocation or modification of any existing facilities necessary to accommodate subject project shall be at the Applicant’s expense. It shall be the responsibility of the Applicant to coordinate all necessary utility relocations with the appropriate utility company.
PW-21 Any existing frontage, or street, improvements, which in the opinion of the City Engineer, are currently damaged or become damaged as a part of the work shall be removed and 302 replaced as required to the current City Standards, or as directed. Prior to start of construction, Developer shall perform a walk-through with the Public Works Department staff and take date-stamped photos of existing conditions.
PW-22 Visual obstructions over three feet in height will not be allowed within the driver's sight triangle near driveways and corners in order to allow an unobstructed view of oncoming traffic. Improvements at driveways and corners are subject to the review and approval of the City Engineer.
PW-23 The project shall comply with the requirements of the m ost current Municipal Regional Permit (MRP) issued to the Fairfield-Suisun Urban Runoff Management Program and to the City’s Stormwater C.3 Guidebook. This includes, but is not limited to, construction and post -construction Best Management Practices (BMPS ); obtaining all necessary permits for storm water discharges; entering into a Stormwater Treatment Measures Maintenance Agreement (attached); preparing a long -term maintenance plan for the Applicant’s maintenance of the post -construction stormwater facili ties; and contracting with a Qualified SWPPP Practitioner (QSP) to inspect and to ensure the implementation of all elements of the Storm Water Pollution Prevention Plan (SWPPP), including non - stormwater and stormwater visual observations, sampling, and ana lysis and preparation of Rain Event Action Plans (REAP).
As part of the improvement plans, the ponding depths, pipe sizing, time of release, and storage for the bioretention facilities shall be calculated. The project shall not introduce any ponding nu isance and shall eliminate the possibility of flooding in the bioretention facilities.
The bioretention facility shall be delineated with a concrete band around the perimeter of the facility. The concrete band shall be per City of Suisun City standard d etail LS-13.
Also, “keep out” signage shall be installed in the bioretention facility.
PW-24 The project shall construct a trash enclosure in compliance with Detail SW-3 of the City’s Stormwater C.3 Guidebook. Additionally, for trash enclosures that w ill be utilized by a food service facility, the drain shall be connected to a properly sized grease removal device and/or treatment devices prior to discharging to the sanitary sewer. An alternative would be to upgrade the existing trash enclosure located by the project site, in compliance with the above-mentioned requirements.
PW-25 Applicant is to remove the existing trash enclosure located on the south side of Main Street between Solano Street and Sacramento Street. In addition, the project is to re -establish two public parking spaces at the latter location, which would require pavement resurfacing and striping.
PW-26 The Project shall install full capture trash devices within proposed on -site drain inlets.
These full trash capture trash devices shall be monitored and maintained by the Applicant or Property Owner.
PW-27 All on-site drain inlets and catch basins along the project frontage shall be marked with “No Dumping – Flows to Bay” or equivalent information.
PW-28 The landscaping and irrigation shall comply with the City’s water efficient landscaping ordinance. The irrigation plans shall include Model Water Efficient Landscape Ordinance (MWELO) calculations
PW-29 Trees shall not be planted within bioretention areas.
PW-30 The maximum allowable slope in landscape areas shall be 3:1, or as approved by City Engineer. Slopes steeper than the allowable slope would require the installation of retaining wall.
PW-31 The Project shall remove all existing groundcover from the planter strips located along the western frontage of the project site. This area is situated south of Driftwood Drive, east of Main Street, north of the existing public restroom near the southwest corner of the project parcel, and west of the existing sidewalk along the western frontage of the project site. The City Engineer reserves the right to modify the limits of this area as necessary.
New groundcover and/or shrubs shall be planted in these planter strips, along with the 303 installation of a 3-inch thick layer of bark mulch. In addition, the existing irrigation system and any damaged curbs within this area shall be repaired or replaced.
PW-32 Any City-owned facilities—such as the North Basin Parking Lot or other areas utilized during the course of the project —that sustain damage, whether in whole or in part, as a result of the project's activities, must be repaired or replaced at the sole expense of the project. Restoration shall be carried out to the satisfaction of the City Engineer and must return the facility to its original or better condition. This requirement applies to all City facilities used for purposes such as, but not limited to, personnel parking, truck or equipment access routes, construction staging areas, material storage, or any other project- related operations.
PW-33 The Applicant shall be responsible for the maintenance of the planter strips to be rehabilitated/reconstructed by the Project. This will require that the irrigation system for said planter strips, including the proposed raised planter located east of the proposed apartment units, be on an irrigation controller separate from the publicly -maintained planter strips.
PW-34 Dust control shall be in conformance with City Standards and Ordinances. Vehicles hauling dirt or other construction debris from the site shall cover any open load with a tarpaulin or other secure covering to minimize dust emissions.
PW-35 Street sweeping shall be regularly performed such that no evidence of tracking dirt shall be present on the public street.
PW-36 All relocated facilities shall meet state and local separation standards. Separation between proposed water and sanitary sewer pipes shall meet the latest Suisun -Solano Water Authority (SSWA) Design Standards, Standard Specifications, and Standard Drawings.
PW-37 Direct tapping of City or SSWA water mains is not permitted. Applicant shall install the required fittings in the existing or new main lines to accommodate the proposed water system. No existing water mains shall be shut down without specific permission of th e City Engineer and the Solano Irrigation District.
PW-38 No structures such as trees, buildings, and concrete foundations shall be installed within utility easements. Civil and landscape plan sheets shall show the utility easements and all other easements.
PW-39 Project improvements shall be in compliance with ADA requirements.
PW-40 The Project shall upgrade the following existing curb ramps with ADA -compliant curb ramps: a) Two existing curb ramps at the northerly entrance to the North Basin Parking Lot, and b) the existing curb ramp located at the existing ADA parking spaces by the southwest corner of the proposed building. If the Fairfield -Suisun Sewer District’s sanitary sewer force main project impacts this latter curb ramp, the District will be responsible for upgrading it as part of their project.
PW-41 Concrete for new and replaced sidewalks, curbs, gutters and curb ramps shall match in color the surrounding existing colored concrete.
PW-42 All new sewer lines and storm drain lines shall be pr ivate and shall be maintained by the Applicant.
PW-43 Prior to the issuance of Certificate of Occupancy, the Applicant shall submit to the Public Works Department “as-built” Improvement Plans in PDF format.
SOLANO IRRIGATION DISTRICT
SID-1 The proposed development will require connections onto the existing domestic water stubs per the SSWA Design Standards and Specification Details.
SID-2 Improvement plans must show all existing facilities located within the project site, along with all proposed modifications that will be required to serve the property (including the water lines on the West side of the property).
SID-3 Any waterlines or public water facilities not installed within a public right -of-way will require an easement granted to SSWA for the oper ations and maintenance of the public 304 facilities.
SID-4 At the time the Building Permit is issued, the developer will be required to pay the appropriate SSWA Connection Fee and Meter Installation Fee at the City of Suisun City.
These fees are determined by the size of the meter requested. All domestic water services will be metered.
SID-5 We require that the District (on behalf of SSWA) review, approve and sign all Final and/or Parcel Maps, and that SSWA review, approve and sign the Improvement Plans for t his development.
SID-6 The SSWA Plan Review Fee applies and is due upon submittal of the maps and plans for review.
SID-7 SSWA’s General Notes must be included in the Improvement Plans, and all proposed water system appurtenances and waterlines shall be constructed per the latest SSWA Design Standards and Specification and Details.
SID-8 Electronic AutoCAD files, GIS Shape Files, and .pdf files are required upon the completion of the project showing “as-builts” for electronic archiving.
PASSED AND ADOPTED at a Regular Meeting of the City Council of the City of Suisun City duly held on Tuesday, August 19th, 2025 by the following vote:
AYES: Councilmembers:__________________________________ NOES: Councilmembers:__________________________________ ABSENT: Councilmembers:__________________________________ ABSTAIN: Councilmembers:__________________________________
WITNESS my hand and the seal of said City this 19th day of August 2025.
___________________________________
Anita Skinner, CMC
City Clerk
305
Attachment 2: Application Materials
306
APN: 0032-091-220
ZONING: COMMERCIAL LOT
LOT SIZE: 0.16 ACRES
CONSTRUCTION TYPE: V-A
HEIGHT : 27'-7" ±
NO. OF STORIES: TWO
BLDG. FLOOR AREA: 13,588 SF
54321
CONSULTANTS
Suite C250
Vacaville, CA 95688
P: 707.453.0196
F: 707.453.1197
190 South Orchard Avenue
www.a2rarch.com
B
A
C
D
© THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE SOLE PROPERTY OF A2R ARCHITECTS INC.; ANY USE WITHOUT WRITTEN CONSENT IS PROHIBITED.
SHEET NO
ISSUE
MARKDATEDESCRIPTION
DATE:
PROJECT NO:
DRAWING FILE:
DRAWN BY:
SHEET TITLE
CHECKED BY:
PROJECT
APPROVALS
DESIGN REVIEW
PROPOSED:
G101
03/03/25
AWANTA
APARTMENTS
TITLE SHEET
400 MAIN STREET
SUISUN CITY CA,
94585
24035
J.A.S.
R.R.S.
SHEET INDEX
GENERAL
G101 TITLE SHEET
LANDSCAPE
L1 PRELIMINARY LANDSCAPE PLAN
CIVIL
C1 PRELIMINARY UTILITIES PLAN AND POST CONSTRUCTION BMP PLAN C2 PRELIMINARY GRADING PLAN
ARCHITECTURAL
A101 OVERALL SITE PLAN
A201 FLOOR PLANS
A231 ROOF PLAN & SECTION
A301 ELEVATIONS
MATERIALSABBREVIATIONS SYMBOLS VICINITY MAP
APPLICABLE CODES
SUMMARY OF WORK
NEW 20 UNIT APARTMENT BUILDING ON EXISTING PAD SITE. ONE AND TWO BEDROOM UNITS. THE FIRST FLOOR FILLS THE ENTIRE
SITE, AND PARKING WILL BE RELIANT ON THE CITY PROVIDED
PARKING. SITE DEVELOPMENT TO INCLUDE GRADING AND ADDING NEW PLANTER AREAS. NO EXISTING TREES TO BE REMOVED.
PROJECT DATA
CIVIL
PHILLIPPI ENGINEERING
425 MERCHANT STREET
VACAVILLE, CA 95688
(707) 451-6556
CONSULTANTS
LANDSCAPE
JAMES CLABAUGH
4556 SHAWN LANE
VACAVILLE, CA 95688
(707) 974-8997
DEFERRED APPROVALS
AWANTA APARTMENTS
400 MAIN STREET
SUISUN CITY, CA 94585
TWO STORY 20 UNIT RESIDENTIAL BUILDING
ONE & TWO BEDROOM UNITS
TOTAL 13,588 SF
PROJECT
SITE
2022 CALIFORNIA BUILDING CODE
2022 CALIFORNIA PLUMBING CODE
2022 CALIFORNIA MECHANICAL CODE
2022 CALIFORNIA ELECTRIC CODE
2022 CALIFORNIA FIRE CODE
2022 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS
2022 CALIFORNIA GREEN BUILDING STANDARDS
2022 CALIFORNIA ADMINISTRATION CODE
CITY OF SUISUN CITY PUBLIC WORKS STANDARD SPECIFICATIONS &
DETAILS
CAL GREEN CONSTRUCTION WASTE MANAGEMENT
CONSULTANTS
& And
L Angle
@ At
℄ Center Line
∅ Diameter or Round
# Pound or Number
(E) Existing
(N) New
ACOUS. Acoustical
A.D. Access Drain
ADJ. Adjustable
AGGR. Aggregate
AL. Aluminum
APPROX. Approximate
ARCH. Architectural
ASB. Asbestos
ASPH. Asphalt
ATC Acoustical Tile Ceiling
BEW Back Edge of Walk
BD. Board
BITUM. Bituminous
BLDG. Building
BLK. Block
BLKG. Blocking
BOT. Bottom
CAB. Cabinet
C.B. Catch Basin
CEM. Cement
CER. Ceramic
C.I. Cast Iron
C.O. Corner Guard
CLG. Ceiling
CLKG. Calking
CLO. Closet
CLR. Closer
CO Clean Out
C.O. Cased Opening
COL. Column
CONC. Concrete
CONN. Connection
CONSTR. Construction
CONT. Continuous
CORR. Corridor
CTSK. Countersunk
CNTR. Counter
CTR. Center
CV Check Valve
DBL. Double
DVDV Double Check Detector Check
DEPT. Department
D.F. Drinking Fountain
DET. Detail
DIA. Diameter
DIM. Dimension
DISP. Dispenser
DN. Down
D.O. Door Opening
DR. Door
DWR. Drawer
DS. Downspout
D.SP. Dry Standpipe
DWG. Drawing
E. East
EA. Each
E.J. Expansion Joint
EL. Elevation
ELEC. Electrical
ELEV. Elevator
EMER. Emergency
ENCL. Enclosure
E.P. Electrical Panelboard
EQ. Equal
EQPT. Equipment
E.W.C. Electric Water Cooler
EXST. Existing
EXPO. Exposed
EXP. Expansion
EXT. Exterior
F Fire
F.A. Fire Alarm
F.B. Flat Bar
F.D. Floor Drain
FDC Fire Department Connection
FDN. Foundation
F.E. Fire Extinguisher
F.E.C. Fire Extinguisher Cabinet
FH Fire Hydrant
F.H.C. Fire Hose Cabinet
FIN. Finish
FL. Floor
FLASH. Flashing
FLUOR. Fluorescent
F.O.C. Face of Concrete
F.O.S. Face of Studs
FPRF. Fireproof
F.S. Full Size
FT. Foot of Feet
FTG. Footing
FURR. Furring
FUT. Future
GA. Gauge
GALV. Galvanized
G.B. Grab Bar
GL. Glass
GND. Ground
GR. Grade
GYP. Gypsum
G.W.B Gypsum Wall Board
H.B. Hose Bib
H.C. Hollow Core
HDWD. Hardwood
HDWE. Hardware
H.M. Hollow Metal
HORZ. Horizontal
HR. Hour
HGT. Height
I.D. Inside Diameter (Dim.)
INSUL. Insulation
INT. Interior
INV Invert
JAN. Janitor
JT. Joint
KIT. Kitchen
LAB. Laboratory
LAM. Laminate
LAV. Lavatory
LKR. Locker
LT. Light
MAX. Maximum
M.C. Medicine Cabinet
MECH. Mechanical
MEMB. Membrane
MET. Metal
MFR. Manufacturer
MH. Manhole
MIN. Minimum
MIR. Mirror
MISC. Miscellaneous
M.O. Masonry Opening
MTD. Mounted
MUL. Mullion
M.R. Moisture Resistant
N. North
N.I.C. Not in Contract
N.O. or # Number
NOM. Nominal
N.T.S. Not to Scale
OA. Overall
OBS. Obscure
O.C. On Center
O.D. Outside Diameter (Dim.)
OFF. Office
OPNG. Opening
OPP. Opposite
P. Paint
PA Planting Area
PIV Post Indicator Valve
PRCST. Pre-cast
PL. Plate
P.LAM. Plastic Laminate
PLAS. Plaster
PLYWD. Plywood
PR. Pair
PT. Point
P.T.D. Paper Towel Dispenser
PTN. Partition
P.T.R. Paper Towel Receptacle
PUE Public Utility Easement
Q.T. Quarry Tile
R. Riser
RAD. Radius
R.D. Roof Drain
REF. Reference
REFR. Refrigerator
RGTR. Register
REINF. Reinforced
REQ. Required
RESIL. Resilient
RM. Room
R.O. Rough Opening
RWD. Redwood
R.W.L. Rain Water Leader
S. South or Slope
S.C. Solid Core
S.C.D. Seat Cover Dispenser
SCHED. Schedule
S.D. Soap Dispenser
SD Storm Drain
SECT. Section
SED See Electrical Drawings
SH. Shell
SHR. Shower
SHT. Sheet
SIM Similar
SMD See Mechanical Drawings
S.N.D. Sanitary Napkin Despenser
S.N.R. Sanitary Napkin Receptacle
SPEC. Specification
SQ. Square
S.ST. Stainless Steel
S.SK. Service Sink
SS Sanitary Sewer, Sewer Service
SSD See Structural Drawings
STA. Station
STD. Standard
STL. Steel
STOR. Storage
STRL. Structural
SUSP. Suspended
SYM. Symmetrical
TRD. Tread
T.B. Towel Bar
T.C. Top of Curb
TEL. Telephone
TER. Terrazzo
T.&G. Tongue and Groove
THK. Thick
T.P. Top of Pavement
T.P.D. Toilet Paper Dispenser
T.V. Television
T.W. Top of Wall
TYP. Typical
TW To Weather
UNF. Unfinished
U.O.N. Unless Otherwise Noted
UR. Urinal
VERT. Vertical
VEST. Vestibule
V.I.F. Verify in Field
W. West
W Water
W/ With
W.C. Water Closet
WO. Wood
W/O Without
WP. Waterproof
WSCT. Wainscot
WT. Weight
ACOUSTICAL TILE (SECTION)
CEMENT PLASTER W/ WIRE
CEMENT PLASTER (ELEVATION)
LATH (SECTION)
BRICK OR C.M.U. (SECTION)
INSULATION, RIGID (PLAN & SECTION)
PLYWOOD (SECTION)
POROUS FILL (SECTION)
WOOD, BLOCKING (SECTION)
WOOD, CONTINUOUS (SECTION)
METAL (SECTION)
CEMENT PLASTER W/ EXPANDED
CERAMIC TILE (PLAN & ELEVATION)
(PLAN & SECTION)
CONCRETE MASONRY UNITS
CONCRETE (PLAN)
CONCRETE (SECTION)
(ELEVATION & SECTION)
INSULATION, BATT (PLAN & SECTION)
GYPSUM BOARD (SECTION)
FINISH CARPENTRY
EARTH (SECTION)
LATH (SECTION)
A101
A REFER TO
WALL TYPE INDICATOR
MATCH LINE
DATUM POINT)
(OR CONTROL OR
WORK POINT
AREA OF REVISION
REVISION NUMBER
REVISION
SCHEDULE
LOUVER SCHEDULE
REFER TO WINDOW/
WINDOW / LOUVER TYPE
REFER TO DOOR
DOOR NUMBER
ELEVATION SHEET
ELEVATION NUMBER
ELEVATION
DETAIL SHEET
DETAIL NUMBER
DETAIL
SECTION SHEET
SECTION NUMBER
SECTION
MULTIPLE BUILDINGS)
BUILDING NUMBER (IF
ROOM NUMBER
ROOM NAME
ROOM IDENTIFICATION
GRID LINE INDICATION
3 J
46 3
A7.0
23 A7.2
A
A5.2
OFFICE
E
5 WALL SCHEDULE
NOTES
•
•
•
•
ANY REVISIONS TO THE APPROVED IMPROVEMENT PLANS AND/OR CITY STANDARDS, INCLUDING THOSE DUE TO FIELD CORRECTIONS, SHALL REQUIRE REVIEW AND WRITTEN APPROVAL BY THE CITY ENGINEER.
ALL EXISTING CONCRETE FACILITIES FRONTING THE PROJECT THAT ARE DAMAGED OR ARE DAMAGED DURING CONSTRUCTION SHALL BE REPLACED.
A NUMBER OF PROPOSED IMPROVEMENTS (TRASH ENCLOSURE, CONCRETE STEPS, PRIVATE UTILITY LINES, ETC.) ARE LOCATED WITHIN PUBLIC RIGHT-OF-WAY, A LEASE AGREEMENT IS LIKELY TO BE WARRANTED.
PROPOSED TRASH ENCLOSURE WILL BE PER THE CITY'S STANDARD TRASH ENCLOSURE DETAIL. 307
BBBBBBBBBB BBBBB
AA
AAAAAA
B
BBBB
CCCCCC
TR
slbx
slbx
br
ebx
D
ebx
ebx
ub
uc
uc
ebx
ebxebx
ebx
ch
TR
EXISTING 27" SS
EXISTING 30" SS
PROPOSED NEW ELECTRICAL POC
PROPOSED NEW RES. 6" SS
EXISTING 12" W
PROPOSED NEW 6" WPOC
PROPOSED NEW 2" WVV
EXISTING 15" SD
PROPOSED NEW 8" SDPOC
CBRIM 6.0
HYD
WM
PIVFDCDDCV
CV
SUGGESTED PLANT LISTSUGGESTED PLANT LIST
SUGGESTED PLANT LIST
SYMBOLSYMBOL
SYMBOLSSYMBOL
QUANTITYQUANTITY
QUANTITYQQUANTITY
BOTANICAL NAMEBOTANICAL NAME
BOTANICAL NAMEBBOTANICAL NAME
COMMON NAMECOMMON NAME
COMMON NAMECCOMMON NAME
CONTAINERCONTAINER
CONTAINERCCONTAINER
WATER USEWATER USE
WATER USEWWATER USE
SIZESIZE
SIZESSIZE
108108
108
JUNCUS PATENSJUNCUS PATENS
JUNCUS PATENS
CALIFORNIA GRAY RUSHCALIFORNIA GRAY RUSH
CALIFORNIA GRAY RUSH
5 GAL.5 GAL.
5 GAL.
MM
M
2' X 2'2' X 2'
2' X 2'
2020
20 DIETES IRIDIODESDIETES IRIDIODES
DIETES IRIDIODES
YELLOW AFRICAN IRISYELLOW AFRICAN IRIS
YELLOW AFRICAN IRIS
5 GAL.5 GAL.
5 GAL.
MM
M
4' X 4'4' X 4'
4' X 4'
88 8
BUXUS SEMPERVIRENS 'MONALEX'BUXUS SEMPERVIRENS 'MONALEX'
BUXUS SEMPERVIRENS 'MONALEX'
PETITE PILLAR DWARF BOXWOODPETITE PILLAR DWARF BOXWOOD
PETITE PILLAR DWARF BOXWOOD
5 GAL.5 GAL.
5 GAL.
MM
M
3' X 5'3' X 5'
3' X 5'
2020
20 NANDINA DOMESTICA 'GULFSTREAM'NANDINA DOMESTICA 'GULFSTREAM'
NANDINA DOMESTICA 'GULFSTREAM'
DWARF HEAVENLY BAMBOODWARF HEAVENLY BAMBOO
DWARF HEAVENLY BAMBOO
5 GAL.5 GAL.
5 GAL.
MM
M
3' X 3'3' X 3'
3' X 3'
66 6
TRACHELOSPERMUM ASIATICUMTRACHELOSPERMUM ASIATICUM
TRACHELOSPERMUM ASIATICUM
ASIAN JASMINEASIAN JASMINE
ASIAN JASMINE
1 GAL.1 GAL.
1 GAL.
MM
M
1' X 4'1' X 4'
1' X 4'
PRELIMINARYLANDSCAPEPLANL1SITE PLANSCALE: 1" = 10' - 0"05'10'20'30'
DRIFTWOOD DRIVE
NORTH BASIN PARKING LOT
EXISTING PALM TREE AND PLANTER
EXISTING LAWN
TYPICAL FLOW-THROUGH PLANTERSGRAY RUSH WITH DECORATIVE STONE MULCH.TO COMPLY WITH SUISUN CITY C.3 STORMWATER GUIDEBOOK.
NEW PLANTER WITH AFRICAN IRIS
NEW PLANTERS WITH BOXWOOD AND HEAVENLY BAMBOO
ASIAN JASMINE GROUND COVER
PROPOSEDBUILDING
EXISTING STREET TREES
PROPERTY LINE (AT BUILDING'S EDGE)
EXISTING SYCAMORE TREES (TO REMAIN)REMOVE ALL EXISTING GROUND COVER AND REPLANT WITH TRACHELOSPERMUM ASIATICUM (ASIAN JASMINE) ADD A 3" THICK LAYER OF BARK MULCH.TEST AND MAKE REPAIRS AS REQUIRED TO THE EXISTING IRRIGATION SYSTEM IN THESE PLANTERS.
SHEET NO
ISSUEMARK123
DATEDESCRIPTION
CONSULTANTS
DATE:PROJECT NO:
DRAWING FILE:DRAWN BY:
SHEET TITLECHECKED BY:
PROJECT
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE SOLE PROPERTY OF A2R ARCHITECTS, INC.; ANY USE WITHOUT WRITTEN CONSENT IS PROHIBITED. 240353/3/25
400 MAIN STREETSUISUN CITYCA 94585
SUITE C250Vacaville, CA 95688707.453.0196707.453.1197P:F:
190 SOUTH ORCHARD AVENUE
JFC
JAMESFERGUSONCLABAUGHLANDSCAPEARCHITECT4556 SHAWN LANEVACAVILLE, CA 95688PHONE: 707-974-8997LIC. NO. 2594
SIGNATURE
RENEWAL DATEDATE
CAPEARCHITECL
SDNAL
TICENSEDLAAUGH259J
SGR
4AMESFEUONCB
CFOETATS
IALFORAIN9/30/2612/11/24
JFC
www.a2rarch.com
APPROVALS
AWANTAAPARTMENTS
308
Ó
309
Ó
310
9.40 CONC
9.52 CONC
9.45 CONC
9.88 CONC
FF 10.50
8.62 CONCFF 10.50
7.96 CONC7.96 CONC7.96 CONC
DRIFTWOOD DRIVEALL UTILITIES TO BE DETERMINDED
MAIN STREET
NORTH BASIN PARKING LOT
EXISTING 12" SS
POC (E) SSMH(E) SSMH
EXISTING 27" SSEXISTING 30" SSEXISTING 12" WPROPOSED NEW 6" W POC
WM
HYD
PIVFDC
PROPOSED NEW 2" W
DDCVCVV V
PROPOSED NEW ELECTRICAL POC
EXISTING 15" SD
PROPOSED NEW 8" SD
POC
CBRIM 6.0
PROPOSED RETAINMENTAREA FOR STORM DRAIN6 AREAS TOTALING390 SF.7,000 SF COVERAGE AT 5%= 350 SF. REQUIRED AREA CO
PROPOSED NEW RES. 6" SS
PROPOSED NEW SSMH
9.75 CONC10.35 CONC
TRASH
10.50 CONC9.46 CONC
9.46 CONC
10.00 CONC9.32 CONC
10.00 CONC
10.00 CONC
8.78 CONC
8.58 CONC
FF 8.00
10.35 CONC10.35 CONC
10.35 CONC10.20 CONC10.05 CONC
10.35 CONC10.35 CONC
10.35 CONC
7.64 CONC7.75 CONC10.25 CONC7.91 CONC10.25 CONC10.25 CONC10.25 CONC10.35 CONC
10.05 CONC10.00 CONC
PLANTER
PLANTER
EVCSEVCS
PROPOSEDAREA OF WORKPROPOSEDELECTRICALSWITCH GEAR
PROPOSEDLANDSCAPEDRAISED CONC.PLANTER
PROPOSEDLANDSCAPEDPLANTER, TYP.
UPGRADE CURBRAMPS TO ADACOMPLIANTCURBS
UPGRADE CURBRAMPS TO ADACOMPLIANTCURBS
A101
SITE PLAN
1" = 10'-0" A1SITE PLANTHESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE SOLE PROPERTY OF A2R ARCHITECTS INC.; ANY USE WITHOUT WRITTEN CONSENT IS PROHIBITED.
SHEET NO
ISSUEMARK123 DATEDESCRIPTION
PROJECT
APPROVALS
DATE:PROJECT NO:
DRAWN BY:SHEET TITLECHECKED BY:
5 4 3 2 1
B
A
C
D
24035
R.R.S.
CA 94585SUISUN CITY
CONSULTANTS
Suite C250Vacaville, CA 95688707.453.0196707.453.1197P:F:190 South Orchard Avenue www.a2rarch.com
03/03/25
APARTMENTS
J.A.S.
AWANTA400 MAIN STREET
PROPOSED:DESIGN REVIEW
A5
B5
PROPOSED (E) LANDSCAPING TO BE IMPROVEDw/ (E) TREES TO REMAIN8 AREAS TOTAL = ± 2,550 SFSEE SHEET L1 FOR ADDITIONAL INFORMATION C5OFFSITE IMPROVEMENTS
PROPOSED FLOW THROUGH PLANTERS - NO TREES SHALL BEPLANTED WITHIN. KEEP OUT SIGNAGE SHALL BE INSTALLED. SEECIVIL FOR ADDITIONAL INFORMATION.RETAINMENT AREA FOR STORM DRAIN:REQUIRED:7,000 SF COVERAGE AT 5% = 350 SFPROPOSED:6 AREAS TOTAL = 390 SF (OK)PROPOSED (N) LANDSCAPING1 RAISED CONCRETE PLANTER=± 185 SF3 GRADE LEVEL w/ CURB=± 360 SF4 AREAS TOTAL = ± 545 SFSEE SHEET L1 FOR ADDITIONAL INFORMATION PROPOSED (N) STAIRS - FOR TENANTS TO ENTER UNITS ON WESTSIDE OF BUILDING5 STAIRCASES TOTAL = ± 85 SFPROPOSED (N) TRASH ENCLOSURE± 140 SFTRASH ENCLOSURE WILL BE PER THE CITY'S STANDARD TRASHENCLOSURE DETAIL. TWO 3 YARD DUMPSTERS w/ 605 GALLONSEACH PROVIDED.
NOTES: ·ALL AREAS LEASED FROM CITY. ± 1,160 SF TOTAL LEASED.·ALL EXISTING CONCRETE FACILITIES FRONTING THE PROJECTTHAT ARE DAMAGED OR ARE DAMAGED DURING CONSTRUCTIONSHALL BE REPLACED.
PROPOSED (N) CONCRETE± 1,775 SFSEE CIVIL FOR ADDITIONAL INFORMATION
PROPERTY LINE
311
DN
DN
UP
DN
DN
DN
UP
DN
1 2 3 4 5
A
C
D
E
F
H
28'-0"21'-0"22'-0"21'-0"28'-0"
18'-6" 10'-8" 10'-8" 18'-6"
A301
B1
A301
B3
A301
C3
A301
C1
120'-0"
58'-4"
G
B
11'-4"16'-8"16'-8"11'-4"
UNIT 2A
779 SF
UNIT 2B
830 SF
UNIT 2D
591 SF
UNIT 2C
520 SF
UNIT 2E
514 SF
UNIT 2F
622 SF
UNIT 2D
591 SF
UNIT 2C
520 SF
UNIT 2G
809 SF
UNIT 2H
854 SF
A1
A231 7'-6"
7'-6"
1 2 3 4 5
A
C
D
E
F
H
A301
B1
A301
B3
A301
C3
A301
C1
58'-4"
18'-6" 10'-8" 10'-8" 18'-6"
120'-0"
28'-0"21'-0"22'-0"21'-0"28'-0"
G
B
11'-4"16'-8"16'-8"11'-4"
3'-6" 6" 6'-0" 4'-0" 5'-7" ±
UTILITIES - ELEC.
UNIT 1A
667 SF
ADA UNIT 1B
760 SF
ADA UNIT 1D
555 SF
UNIT 1C
525 SF
UNIT 1E
530 SF
ADA UNIT 1F
585 SF
ADA UNIT 1D
555 SF
UNIT 1C
525 SF
UNIT 1G
719 SF
ADA UNIT 1H
749 SF
A1
A231
STORM DRAIN
RETAINMENT
AREA - 6 TOTAL
(E) MASONRY WALL & GRASS AREA
(N) PLANTER
54321
CONSULTANTS
Suite C250
Vacaville, CA 95688
P: 707.453.0196
F: 707.453.1197
190 South Orchard Avenue
www.a2rarch.com
B
A
C
D
© THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE SOLE PROPERTY OF A2R ARCHITECTS INC.; ANY USE WITHOUT WRITTEN CONSENT IS PROHIBITED.
SHEET NO
ISSUE
MARKDATEDESCRIPTION
DATE:
PROJECT NO:
DRAWING FILE:
DRAWN BY:
SHEET TITLE
CHECKED BY:
PROJECT
APPROVALS
DESIGN REVIEW
PROPOSED:
A201
2/18/25
AWANTA
APARTMENTS
FLOOR PLANS
400 MAIN STREET
SUISUN CITY CA,
94585
24035
J.A.S.
R.R.S.
1/8" = 1'-0"A3 SECOND FLOOR PLAN
NOTE: ALL DIMENSIONS ARE TO FACE OF STUD
1/8" = 1'-0"A1 FIRST FLOOR PLAN
312
1 2 3 4 5
A
C
D
E
F
H
120'-0"
28'-0"21'-0"22'-0"21'-0"28'-0"
58'-4"
18'-6" 10'-8" 10'-8" 18'-6"
G
B
A1
A231
GROUND FLOOR
0'-0"
SECOND FLOOR
12'-5"
1 2 3 4 5
FIRST FLOOR
2'-6"
T.O. MECH. SCREEN
25'-10"
± 8'-1"
54321
CONSULTANTS
Suite C250
Vacaville, CA 95688
P: 707.453.0196
F: 707.453.1197
190 South Orchard Avenue
www.a2rarch.com
B
A
C
D
© THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE SOLE PROPERTY OF A2R ARCHITECTS INC.; ANY USE WITHOUT WRITTEN CONSENT IS PROHIBITED.
SHEET NO
ISSUE
MARKDATEDESCRIPTION
DATE:
PROJECT NO:
DRAWING FILE:
DRAWN BY:
SHEET TITLE
CHECKED BY:
PROJECT
APPROVALS
DESIGN REVIEW
PROPOSED:
A231
2/18/25
AWANTA
APARTMENTS
ROOF PLAN &
SECTION
400 MAIN STREET
SUISUN CITY CA,
94585
24035
J.A.S.
R.R.S.
1/8" = 1'-0"A3 ROOF PLAN
1/8" = 1'-0"A1 STAIR SECTION
313
GROUND FLOOR
0'-0"
SECOND FLOOR
12'-5"
12345
FIRST FLOOR
2'-6"
T.O. MECH. SCREEN
25'-10"
2'-6" 9'-11" 13'-5" 1'-9" ±
27'-7" ±
8 7
1 11 10 12
5 4
323
11 5
6 GROUND FLOOR
0'-0"
SECOND FLOOR
12'-5"
A C D E F H
FIRST FLOOR
2'-6"
T.O. MECH. SCREEN
25'-10"
GB
1'-9" ±13'-5"9'-11"2'-6"
27'-7" ±
8 7
5 6
2 3
11 10 12
4 5
1 2
GROUND FLOOR
0'-0"
SECOND FLOOR
12'-5"
ACDEFH
FIRST FLOOR
2'-6"
T.O. MECH. SCREEN
25'-10"
G B
1'-9" ±13'-5"9'-11"2'-6"
27'-7" ±
1 2
7 8
11 10
3 2
5 4
6 12
GROUND FLOOR
0'-0"
SECOND FLOOR
12'-5"
1 2 3 4 5
FIRST FLOOR
2'-6"
T.O. MECH. SCREEN
25'-10"
1'-9" ±13'-5"9'-11"2'-6"
27'-7" ±
2 1
7 8
111012
4 5
8 11
1 2
3 4
5 6
7 DECORATIVE CORBELS - PAINTED
8 9
CORNICE - 2x12 - PAINTED
CORNER TRIM - 2x4 & 2x6 - PAINTED
NOT USED
10 6" MASONRY STORM DRAIN RETAINMENT AREA w/ STONE FINISH AND CAP
PATIO AND STAIR RAILINGS
DARK BRONZE WINDOW FRAMES AND DOORS
WINDOW AND DOOR TRIM - PAINTED
FIBER CEMENT STAGGERED EDGE SHINGLE - JAMES HARDIE - HICKORY TAN STONE WAINSCOTTING w/ CAP
SHINGLE ROOF11
MECHANICAL SCREEN - PAINTED TO MATCH TRIM12
54321
CONSULTANTS
Suite C250
Vacaville, CA 95688
P: 707.453.0196
F: 707.453.1197
190 South Orchard Avenue
www.a2rarch.com
B
A
C
D
© THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE SOLE PROPERTY OF A2R ARCHITECTS INC.; ANY USE WITHOUT WRITTEN CONSENT IS PROHIBITED.
SHEET NO
ISSUE
MARKDATEDESCRIPTION
DATE:
PROJECT NO:
DRAWING FILE:
DRAWN BY:
SHEET TITLE
CHECKED BY:
PROJECT
APPROVALS
DESIGN REVIEW
PROPOSED:
A301
2/18/25
AWANTA
APARTMENTS
ELEVATIONS
400 MAIN STREET
SUISUN CITY CA,
94585
24035
J.A.S.
R.R.S.
1/8" = 1'-0"C1 NORTH ELEVATION
1/8" = 1'-0"C3 WEST ELEVATION
1/8" = 1'-0"B3 EAST ELEVATION
1/8" = 1'-0"B1 SOUTH ELEVATION
A5 DRAWING NOTES
314
315
316
317
318
319
AWANTA
An Apartment Building
A2R ARCHITECTS 12.16.24 1
Project Description:
The project/property in question is located at 400 Main Street, Suisun City, California.
The proposed building is located on an existing pad site along the Historic Suisun City waterfront. The first and second floors are proposed to accommodate 10 single story apartments each. The first floor fills the entire site, and no existing trees are to be removed.
Parking will be reliant on the city provided parking; however, the train station and other transportation hubs are easily walked to.
All apartments include a deck area that is accessible by main living room with views overlooking the downtown Suisun Waterfront area. Windows and glass doors capture views of the harbor and historic downtown areas. The 20 apartments include 28 bedrooms with 8 two-bedroom units and 12 one-bedroom units. Since the average renting household has 2.35 residents currently the expected occupancy of the 20 units would be 47 using the national average.
Mechanical units will be located behind the pitched roofs in an enclosed space not visible from street and screened from taller vantage points.
EXTERIOR:
▪ The design is based on craftsman architecture incorporating durable fiber cement siding in a staggered shingle, the aesthetics of natural wood and stone, and contrasting trim.
The variety of materials will highlight the traditional elements of the building while allowing the passerby to enjoy the comforting craftsman design elements. ▪ The building first floor has been raised to a first-floor level of ten and a half feet above sea level. The units on the west side of the building facing the adjacent parking lot have between two and four steps up to their entries in order to follow the existing grading.
The east side of the building will be re-graded to not require stairs up to the units. A short five step staircase will lead from Driftwood Drive with an accompanying walkway separated by a new planter to provide wheelchair access. ▪ Access to the second-floor apartments will be on the west side nearest to the parking lot through glass doors beneath covered entries with landings at the tops of the stairs.
No more than four second floor units will share a staircase.
FAIRFIELD-SUISUN SEWER DISTRICT
The site plan for the project shows the proposed utility connection points. Once the conditions of approval have been approved by the city a civil engineer will be added to the project team. • The trash enclosure will be located in the adjacent parking lot. Hot and water will be provided along with a floor drain connecting to a grease interceptor. • One new sewer line for apartments will be connected to a new proposed manhole on main street.
• Six storm water detention areas are indicated on the site plan. These will be connected to the existing storm drain DI located in the main street parking lot. 320
AWANTA
An Apartment Building
A2R ARCHITECTS 12.16.24 2
• A new water main will be connected to the existing 12 inch main street line and ran to the building. We are proposing the DDCV, PIV and FDC be located in a landscape area along the parking lot. One water service with meter will be branched off for domestic use.
• Sewer capacity and easements will have to be determined prior to the start of construction.
• Leased areas and uses are indicated in attached sheet A101. Total area proposed to lease is approximately 975 SF.
TENTATIVE PROJECT SCHEDULE:
▪ Planning: 12/20/24 to 3/31/25
▪ Working Drawings: 4/2/25 to 5/30/25
▪ Plan checking: 6/1/25 to 7/2/25
▪ Bidding: 7/2/25 to 8/1/25
▪ Construction: 8/1/25 to 4/2/26
▪ Occupancy: 4/3/26
BUILDING INFORMATION
• Building Total Square Footage: 13,588 SF
• Area by Floor:
o 1. 6,521 SF
o 2. 7,067 SF
• Height of Building: 27’-7”
• Apartment Information:
o Unit 1A – 2 bedrooms, 1 bathroom
1 total: 667 SF
o Unit 1B – 2 bedrooms, 1 bathroom
1 total: 760 SF
o Unit 1C – 1 bedroom, 1 bathroom
2 total: 525 SF
o Unit 1D – 1 bedroom, 1 bathroom
2 total: 555 SF
o Unit 1E – 1 bedroom, 1 bathroom
1 total: 530 SF
o Unit 1F – 1 bedroom, 1 bathroom
1 total: 585 SF
o Unit 1G – 2 bedrooms, 1 bathroom
1 total: 719 SF
o Unit 1H – 2 bedrooms, 1 bathroom
1 total: 749 SF
o Unit 2A – 2 bedrooms, 2 bathroom
1 total: 779 SF
o Unit 2B –2 bedrooms, 2 bathroom
1 total: 830 SF
o Unit 2C – 1 bedroom, 1 bathroom
2 total: 520 SF
o Unit 2D – 1 bedroom, 1 bathroom
2 total: 591 SF
o Unit 2E – 1 bedroom, 1 bathroom
1 total: 514 SF
o Unit 2F – 1 bedroom, 1 bathroom
1 total: 622 SF
o Unit 2G – 2 bedrooms, 1.5 bathroom
1 total: 809 SF
o Unit 2H – 2 bedrooms, 2 bathroom
1 total: 854 SF
321
9.40 CONC
9.52 CONC
9.45 CONC
9.88 CONC
FF 10.50
8.62 CONCFF 10.50
7.96 CONC7.96 CONC7.96 CONC
DRIFTWOOD DRIVEALL UTILITIES TO BE DETERMINDED
MAIN STREET
MAIN STREET PARKING LOT
EXISTING 12" SSPOC (E) SSMH(E) SSMH
EXISTING 27" SSEXISTING 30" SSEXISTING 12" WPROPOSED NEW 6" WPOCWM HYD
PIVFDC
PROPOSED NEW 2" W
DDCVCVV V
PROPOSED NEW ELECTRICAL POC
EXISTING 15" SD
PROPOSED NEW 8" SD
POCCBRIM 6.0
PROPOSED RETAINMENTAREA FOR STORM DRAIN6 AREAS TOTALING390 SF.7,000 SF COVERAGE AT 5%= 350 SF. REQUIRED AREA CO
PROPOSED NEW RES. 6" SS
PROPOSED NEW SSMH
9.75 CONC10.35 CONC
TRASH
10.50 CONC9.46 CONC
9.46 CONC
10.00 CONC9.32 CONC
10.00 CONC
10.00 CONC
8.78 CONC
8.58 CONC
FF 8.00
10.35 CONC10.35 CONC
10.35 CONC10.20 CONC10.05 CONC
10.35 CONC10.35 CONC
10.35 CONC
7.64 CONC7.75 CONC10.25 CONC7.91 CONC10.25 CONC10.25 CONC10.25 CONC10.35 CONC
10.05 CONC10.00 CONC
PLANTER
PLANTER
9.40 CONC
9.52 CONC
9.45 CONC
9.88 CONC
FF 10.50
8.62 CONCFF 10.50
7.96 CONC7.96 CONC7.96 CONC
DRIFTWOOD DRIVEALL UTILITIES TO BE DETERMINDED
MAIN STREET
MAIN STREET PARKING LOT
EXISTING 12" SSPOC (E) SSMH(E) SSMH
EXISTING 27" SSEXISTING 30" SSEXISTING 12" WPROPOSED NEW 6" WPOCWM HYD
PIVFDC
PROPOSED NEW 2" W
DDCVCVV V
PROPOSED NEW ELECTRICAL POC
EXISTING 15" SD
PROPOSED NEW 8" SD
POCCBRIM 6.0
PROPOSED RETAINMENTAREA FOR STORM DRAIN6 AREAS TOTALING390 SF.7,000 SF COVERAGE AT 5%= 350 SF. REQUIRED AREA CO
PROPOSED NEW RES. 6" SS
PROPOSED NEW SSMH
23'-5" ±
19'-6" ±
14'-2" ±
9.75 CONC10.35 CONC
TRASH
10.50 CONC9.46 CONC
9.46 CONC
10.00 CONC9.32 CONC
10.00 CONC
10.00 CONC
8.78 CONC
8.58 CONC
FF 8.00
10.35 CONC10.35 CONC
10.35 CONC10.20 CONC10.05 CONC
10.35 CONC10.35 CONC
10.35 CONC
7.64 CONC7.75 CONC10.25 CONC7.91 CONC10.25 CONC10.25 CONC10.25 CONC10.35 CONC
10.05 CONC10.00 CONC
A101
SITE PLAN
1" = 10'-0" A1SITE PLANTHESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND ARE THE SOLE PROPERTY OF A2R ARCHITECTS INC.; ANY USE WITHOUT WRITTEN CONSENT IS PROHIBITED.
SHEET NO
ISSUEMARK123 DATEDESCRIPTION
PROJECT
APPROVALS
DATE:PROJECT NO:
DRAWN BY:SHEET TITLECHECKED BY:
5 4 3 2 1
B
A
C
D
24035
R.R.S.
CA 94585SUISUN CITY
CONSULTANTS
Suite C250Vacaville, CA 95688707.453.0196707.453.1197P:F:190 South Orchard Avenue www.a2rarch.com
12/16/24
COMPLEX
J.A.S.
BLOCK400 MAIN STREET
thePROPOSED:DESIGN REVIEW
322
AGENDA ITEM NO. 19.
AGENDA TRANSMITTAL
MEETING DATE:
July 15, 2025
AGENDA ITEM:
Council Adoption of Resolution No. 2025-___; Approving Planned Unit Development Application No. PLN-00003 and Site Plan/Architectural Review Application No. PLN- 00004 for a Twenty-Unit Multi-Family Residential Project at 400 Main Street (Assessor Parcel Number (APN) 0032-091-220).
FISCAL IMPACT:
The project is anticipated to contribute $15,500 in Community Facility District taxes annually. However, the overall contribution will be dependent on project specifics.
STRATEGIC PLAN:
Provide Good Governance.
BACKGROUND:
The subject property, located at 400 Main Street, is a 0.16-acre parcel which is currently vacant. The site is located within the Waterfront District Specific Plan and designated as Commercial/Office/Residential (C/O/R), which supports multi-family housing development as a standalone project.
In response to the City’s ongoing efforts to address regional housing needs and support infill development, the applicant, Siavash Afshar, submitted an application proposing a Planned Unit Development (PUD) consisting of 20 multi-family residential units. The project is designed to provide a mix of 1- and 2-bedroom units, along with associated site improvements.
Due to the location and nature of the project, a PUD process is required in order to provide for design flexibility in site layout, architecture, and shared open space configuration, while maintaining consistency with applicable zoning and development standards. The project site is situated less than 800 feet from public transit (Suisun-Fairfield Train Depot) and within walking distance of schools, retail, and public parks, making it well suited for higher-density residential development.
This proposal comes at a time when the City is actively pursuing strategies to increase the availability of diverse housing options in alignment with the Housing Element and State housing mandates. The project is subject to Planning Commission review for consistency with zoning, design standards, and community compatibility through the PUD approval process. The role of the City Council in this case is to take action on the subject development application.
Good Neighbor Meeting
The project applicant held a Good Neighbor Meeting on Monday, April 14, 2025, at 6:30PM via Zoom.
The meeting lasted slightly more than an hour and allowed community members to ask questions following a presentation on the project. Following staff review of the transcript and recording, it appeared the key issues raised included:
• Parking
• Why first floor commercial wasn’t pursued in project design • Project appearance and site design
• Interaction of the private development project with the surrounding public space 323
Staff will be discussing these issues in some depth later in the staff report.
Planning Commission Public Hearing June 11, 2025
The Planning Commission held a public hearing on Wednesday June 11, 2025. At the meeting, the Commission recommended City Council approval by a vote of 3-0 (with one absence and one abstention). As part of their recommendation, the Commission added a condition that the applicant/developer enter into a parking/maintenance agreement with the City and the developer submit a disclosure document for the future residents for the Development Services Director to review and approve. The intention of the parking/maintenance agreement would be to clearly define how the project's resident parking would be handled within the adjacent public parking lot via a permit parking system, or similar, as well as any maintenance responsibilities. Additionally, the disclosure document is intended to provide information about the project, make residents aware of the project's location adjacent to public space, and define responsibilites of residents including upkeep of their spaces from the exterior. A draft of the disclosure document has been included as Attachment 4 of this staff report.
STAFF REPORT:
The subject request is required to complete both a Planned Unit Development Permit as well as Site Plan/Architectural Review Permit. The applicant proposes the development of a 20-unit multi-family residential Planned Unit Development (PUD) on a 0.16-acre parcel located at 400 Main Street. The project includes:
• 20 residential units within a single building.
• A mix of 1-bedroom and 2-bedroom units.
• On-site manager’s unit.
• Available public parking to the west of the project. • Pedestrian pathways and bicycle parking.
• Landscaping consistent with City design standards.
Site Description and Context
• Current Use: Vacant
• Topography: Generally flat
• Surrounding Uses:
North: One Harbor Center (Office)
South: Suisun Slough
East: Public park (Sheldon Plaza)
West: Public Parking Lot
Zoning and Land Use Consistency
The proposed use is consistent with the General Plan designation of Downtown Waterfront (DW) and the subject specific plan designation of Commercial/Office/Residential (C/O/R). As stated within the Specific Plan, sites that carry the designation of C/O/R require a Planned Unit Development entitlement application. The PUD process allows for flexibility in site design while ensuring compatibility with surrounding development.
Planned Unit Development Permit
As stated in Section 18.72.010 of the Suisun City Municipal Code, “The Planned Unit Development (PUD) permit is designed and intended to provide for the orderly development of land in conformance with the comprehensive scheme contemplated by the land use element and other elements of the general plan of the city and specific plan, where applicable. The permit would allow a flexible design approach 324
to the establishment of a community environment equal to or better than that resulting from the application of the minimum standards of this title. The permit is designed and intended to accommodate various types of development, such as neighborhood and district shopping centers, professional and administrative office areas, multi-family housing developments, single-family residential developments, commercial service centers, and light industrial parks, or any other use or combination of uses which can be made appropriately a part of a planned development.” Further, Section 3.1.2.B Commercial/Office/Residential, “Generally, permitted and conditional uses allowed in this zone are the same as those permitted in the Main Street Mixed Use zone…and in addition, stand-alone residential project may comply with the allowed uses specified for the Residential Medium Density zone. Specific uses, location, layout and character of development shall be established by approval of a Planned Unit Development permit by the Planning Commission and City Council. Notwithstanding the flexibility provided by the PUD process, development standards should generally conform to those provided by the MSMU zone.”
WDSP Standard
Proposed Project
Front Setback
0' min - 15' max
0'
Side Setback
0' min - 5' max
0'
Rear Setback
15' min
0'
Height
50' max
27'7"
Parking Spaces
24 0'* See parking analysis
PUD permits allow for certain deviations from standards in place of high-quality projects. The City Council must weigh the requested deviations against the overall project. Below is a table comparing the Waterfront District Specific Plan vs the proposed project considering setbacks, height, and parking.
As you can see from the above table, the project is requesting certain deviations to the applicable development standards for the construction of a two-story building with 8 two-bedroom units and 12 one-bedroom units. As specified in the “Planned Unit Development” discussion previously, the site is unique in size, location, and orientation which is why a PUD permit is required. Thus, this number of requested deviations is expected.
Application Process
Staff has been working closely with the project applicant over the past 12 months, making significant progress in the development and financing efforts for the proposed project. The project applicant first identified the lot in late 2023 and entered into a formal agreement with the property owners to develop the site on February 16, 2024.
After securing this agreement, the developer engaged with Suisun City officials, including the Principal Planner and the Director of Development Services, to ensure compliance with zoning and planning requirements. These discussions addressed zoning classifications, density, lot coverage, and other relevant regulations. The project applicant prepared a preliminary project description and submitted the required pre-application fee. A pre-application meeting was subsequently held, with representatives from multiple city departments—Fire, Police, Public Works, and Planning—providing comprehensive feedback, which was incorporated into the following planning stages.
To advance the project, the developer assembled a team of professionals, including an architect, civil engineer, landscape architect, soil engineer, and surveyor. Together, they began assessing the feasibility of various development options, identifying three primary areas of focus and challenge.
325
Challenges with Incorporating a Commercial Element
The initial concept was a four-story mixed-use building:
•
First Floor:
Approximately 7,000 sq. ft. of retail space.
•
Second Floor:
10 apartment units.
•
Third & Fourth Floors:
10 two-story residential units.
However, this plan required substantial infrastructure, such as dedicated parking spaces, an elevator, and other amenities. These features were complex to integrate due to the lot’s limited size. The spatial constraints made it challenging to meet both the commercial and residential requirements without compromising on building code compliance or usability.
Feasibility Exploration of Mixed-Use Development
To finance the proposed mixed-use building, the developer held discussions with various lenders, financing partners, and loan brokers. Although these parties were impressed with the property’s location and scenic views, they all emphasized that financing would be dependent on securing a fully executed five-year lease with reputable local or national retail tenants.
Moreover, many prospective commercial tenants had specific and costly demands, including:
• Drive-through capabilities.
• Large tenant improvement allowances.
These conditions significantly increased projected development costs and added further complexity to the financial viability of the mixed-use plan. Without a secured lease in place, financial institutions were unwilling to commit funding.
Financial Constraints and Other Challenges
The overall cost of construction—coupled with the financial burden of required amenities such as parking infrastructure, vertical access (e.g., elevators), and tenant improvements, created considerable financial obstacles. When compared with the current local rental market, both for commercial and residential units, it became evident that anticipated rental income from a mixed-use project would be insufficient to cover development costs.
Consequently, the project direction shifted toward a more modest and financially feasible residential- only development. This revised concept better aligns with the property’s limitations and integrates more naturally with the surrounding neighborhood. The site’s proximity to public transportation and its setback from Main Street make it particularly suitable for residential use.
Importantly, this residential focus is in line with Suisun City's recent downtown planning studies and economic development strategies, which promote increased residential density in the urban core. By adding more housing units ("rooftops"), the project would contribute to the local population needed to support nearby businesses and promote long-term economic growth.
Parking
Staff conducted a parking study, which can be found as Attachment 3 of the staff report, to assess existing parking availability and usage patterns in the downtown and waterfront-adjacent areas. The study was prompted by the proposed project and anticipated development projects. The City's goal is to ensure that sufficient parking resources are available to meet the current proposed project and future demands. City staff completed all data collection, including manual parking counts and occupancy 326
tracking, throughout multiple days and time periods. The analysis provides a summary of parking inventory, occupancy trends, and key observations.
Parking counts were conducted manually across five designated areas (Areas A–E) covering downtown Suisun City. Observations were made at different times of day (morning, midday, and afternoon) over the course of the week. Where parking spaces were unmarked, estimates were calculated based on standard curb lengths and vehicle spacing. Occupancy data was recorded to analyze peak usage trends and better understand the availability of parking resources during varied conditions. The map and attached spreadsheet contain detailed data, including day-by-day counts and occupancy percentages.
The following detail below represents the parking area zones (a corresponding map details the specific zones):
Area A (Driftwood to dead end, Downtown Main Street, Lot behind STA):
230 spaces
Area B (Kellogg Parking Lot):
130 spaces
Area C (Lawler and Theater Parking Lots):
44 spaces
Area D (Street Parking along Main Street):
109 spaces
Area E (Morgan, Line, Solano, and Kellogg Streets):
86 spaces
In total, the total number of public parking spaces across Areas A through E is 599 spaces (this total does not include residential parking spaces west of Main Street). Parking for the proposed project would be located in Area A.
Parking Area Analysis
City staff conducted parking occupancy surveys during typical business hours, targeting periods commonly associated with peak parking demands specifically around midday and into the late afternoon (see attached: Occupancy Tracking). These timeframes were selected to capture the highest likely usage and provide an accurate representation of parking conditions during peak demand. The resulting survey data revealed the following insights into each area:
Area A
– This area includes 230 parking spaces. Survey results showed consistently low occupancy rates, ranging from a low of 11% to a peak of just 20%. At no point during the survey period did occupied spaces exceed 47. Although the parking survey covered the broader downtown area, Area A is the most likely location to accommodate the parking demand associated with the proposed multifamily project.
Area B
– This area contains 130 parking spaces. Survey results indicated a low occupancy rate of 19%, with a peak of 56%. At no point during the survey did the number of occupied spaces exceed 74. While the data confirms there is generally ample parking availability, it also shows a clear trend of increasing demand as the week progresses. This pattern aligns with expectations, as Area B is centrally located within the City’s commercial core, featuring restaurants and service-oriented businesses. The combination of free parking and close proximity to these amenities contributes to the higher occupancy levels observed. Given its commercial nature and rising demand, Area B is not considered a suitable parking option for the proposed multifamily project.
Area C
– Based on survey data, Area C experiences the highest parking demand among all areas studied. Occupancy rates remained consistently high, never falling below 70%, and peaked at 95% as the week progressed. While this area shares a similar proximity to local services as Area B, it functions as the primary hub of activity in the downtown core. One key factor contributing to its high utilization is its convenient, fluid access from Main Street and reduced safety conflicts compared to Area B. 327
Additionally, Area C consists primarily of off-street parking, which is generally perceived as safer and more accessible for visitors to nearby businesses and services.
Area D
– Serving as the main thoroughfare through downtown, Area D showed a steady increase in parking occupancy as the week progressed, with approximately 50% of its 109 spaces occupied on average during the survey period. Despite its central location, the relatively small number of businesses along this stretch suggests that many vehicles are utilizing these spaces for long-term rather than short- term parking. This pattern may be attributed to residential spillover from neighborhoods west of Main Street, further contributing to sustained occupancy levels.
Area E
– Located along key east-west cross streets in the heart of downtown, Area E consistently maintained occupancy rates above 50% throughout the week. With 86 on-street parking spaces available, observed usage ranged from 38 to 60 occupied spaces during the survey period. This area offers convenient and ample parking options for visitors accessing downtown services and amenities, supporting its role as a vital component of the overall downtown parking network.
Summary Findings
An analysis of five key parking areas in the downtown district reveals varying levels of usage and potential for accommodating future parking needs. Area A, offering 230 spaces, is significantly underutilized, with occupancy rates ranging between 11% and 20%. With a peak usage of only 47 spaces during the survey period, Area A presents the most viable option for supporting the proposed multifamily development due to its consistent availability.
In contrast, Area B, which includes 130 spaces, experiences moderate to increasing demand, particularly toward the end of the week, reaching a high occupancy rate of 56%. Positioned within a vibrant commercial hub filled with restaurants and services, its parking demand aligns with expected patterns in such active areas. Given its commercial focus and rising utilization, balancing future residential that relies on Area B as its primary parking option is not recommended.
Area C stands out as the most impacted zone, with occupancy rates consistently remaining above 70% and peaking at 95%. Its prime location, off-street layout, and safer access from Main Street contribute to its heavy use. Due to its consistently high demand, this area lacks the capacity to support new residential parking needs.
Area D, which serves as a primary downtown corridor, maintains an average occupancy of around 50% across its 109 spaces. The parking spaces appear to be used predominantly for long-term stays, possibly by nearby residents or workers, indicating less turnover and availability for short-term or additional parking.
Finally, Area E, encompassing key east-west streets in the downtown core, shows steady occupancy between 44% and 70% throughout the week. With 86 total spaces, it serves as a dependable option for visitors accessing central downtown services, though not ideal for meeting future residential parking requirements.
In conclusion, while Areas B, C, D, and E serve important roles in supporting commercial and visitor parking, Area A offers the most potential to accommodate new residential parking demands due to its low usage and availability.
Project Parking Requirements
Under California state law, specifically Assembly Bill 2097 (AB 2097), cities and other public agencies 328
are generally prohibited from imposing minimum parking requirements on most development projects located within one-half mile of a major transit stop. This law, effective January 1, 2023, applies to residential, commercial, and mixed-use developments, aiming to encourage transit-oriented development and reduce reliance on cars.
By eliminating mandatory parking minimums near transit hubs, AB 2097 aims to:
• Reduce housing costs by allowing developers to build projects without the added expense of constructing parking spaces.
• Encourage the use of public transportation and reduce greenhouse gas emissions. • Promote denser, more walkable communities.
This law is part of California's broader efforts to address housing affordability and environmental sustainability by reforming land use and transportation policies.
The proposed multifamily development includes 19 residential units and one on-site manager unit.
Under previous local parking requirements, the project would have been required to provide 24 parking spaces, based on a calculation of 1 to 1.5 spaces per bedroom.
Recent changes in state legislation, along with the City’s Bay Conservation and Development Commission (BCDC) permit, have resulted in a more flexible approach to parking. Given the project's close proximity to a fixed-route transit center, the applicant, after collaborating with City staff, has chosen not to implement a minimum parking requirement. This strategic decision not only aligns with state policy goals to encourage housing development near transit but also aims to decrease dependence on private vehicles.
New state legislation allows the applicant to deviate from local parking requirements. Based on data collected during the City’s parking survey, the project’s location in Area A does not present a parking concern, as survey results indicate consistently low occupancy and no evidence of parking constraints in that area.
Lastly, there was an item that was raised at the Good Neighbor Meeting that pointed out that the public parking adjacent to the project restricted parking between the hours of 2-5AM. Staff would suggest that this issue be resolved by adding a condition of approval which requires the developer/applicant coordinate with the City to allow for issuance of special parking permits for any resident of the project.
As mentioned earlier in this report, parking was discussed at length at the June 11 Planning Commission public hearing. Following the meeting, staff researched how municipalities have handled similar issues including the interface of private development projects with public parking areas. As a result, staff has determined that municipalities typically issue either monthly or annual passes, associated with a fee,for residents which are commonly regulated by using license plate information. It is expected that as development increases in the downtown area, a robust analysis and solution will be required with input from the community and ultimate adoption of a policy by the City Council.
Architecture and Design
As a part of the application submittal, the applicant has provided a discussion on the project architecture and design. Below are key points from the submittal:
• The design is based on craftsman architecture incorporating durable fiber cement siding in a staggered shingle, the aesthetics of natural wood and stone, and contrasting trim. The variety of materials will highlight the traditional elements of the building while allowing the passerby to enjoy the 329
comforting craftsman design elements.
• The building first floor has been raised to a first-floor level of ten and a half feet above sea level.
The units on the west side of the building facing the adjacent parking lot have between two and four steps up to their entries in order to follow the existing grading. The east side of the building will be re- graded to not require stairs up to the units. A short five step staircase will lead from Driftwood Drive with an accompanying walkway separated by a new planter to provide wheelchair access. • Access to the second-floor apartments will be on the west side nearest to the parking lot through glass doors beneath covered entries with landings at the tops of the stairs. No more than four second floor units will share a staircase.
As the Council can see, the parcel is not only small in nature but also presents challenges in that the site elevation must be raised. As a result, solutions relative to access and interaction with the existing surrounding public space were needed. Staff has determined that these solutions are appropriate in this case.
Environmental Review
California Environmental Quality Act (CEQA) Guidelines §15182 provides a specific exemption from additional environmental review under certain conditions. It is designed to streamline the CEQA process for qualifying residential projects that are consistent with a Specific Plan for which an Environmental Impact Report (EIR) has already been certified. The project must be residential, mixed-use residential, or residential in conjunction with public infrastructure and be consistent with a Specific Plan that has already undergone environmental review via an EIR. Finally, the project must not cause new significant effects or require additional mitigation measures beyond what was analyzed in the EIR for the Specific Plan.
Proposed Conditions of Approval
Following review of the project, staff has prepared several conditions of approval for consideration; however, staff has included some of the more complex conditions for City Council consideration:
PW-25 Applicant is to remove the existing trash enclosure located on the south side of Main Street between Solano Street and Sacramento Street. In addition, the project is to re-establish two public parking spaces at the latter location, which would require pavement resurfacing and striping.
PW-32 Any City-owned facilities—such as the North Basin Parking Lot or other areas utilized during the course of the project—that sustain damage, whether in whole or in part, as a result of the project's activities, must be repaired or replaced at the sole expense of the project. Restoration shall be carried out to the satisfaction of the City Engineer and must return the facility to its original or better condition.
This requirement applies to all City facilities used for purposes such as, but not limited to, personnel parking, truck or equipment access routes, construction staging areas, material storage, or any other project-related operations.
PW-40 The Project shall upgrade the following existing curb ramps with ADA-compliant curb ramps:
a) Two existing curb ramps at the northerly entrance to the North Basin Parking Lot, and b) the existing curb ramp located at the existing ADA parking spaces by the southwest corner of the proposed building.
If the Fairfield-Suisun Sewer District’s sanitary sewer force main project impacts this latter curb ramp, the District will be responsible for upgrading it as part of their project.
Required Findings for Planned Unit Development Permit Site Plan/Architectural Review In order for the City Council to approve a Planned Unit Development Permit and Site Plan/Architectural Review Permit, specific findings are required to be made. These findings assure consistency with 330
applicable regulatory plans and compatibility with adjacent land uses and residents. Below are the required findings:
1. That the proposed project along with the proposed conditions under which it would be operated or maintained will be consistent with the Suisun City General Plan, Title 18 “Zoning” of the Suisun City Municipal Code, and the Waterfront Specific Plan
2. That the proposed project along with the proposed conditions under which it would be operated or maintained will be consistent with the General Plan.
3. That the proposed project will not be detrimental to the public health, safety, or welfare of persons residing or working in or adjacent to the neighborhood of such use, nor detrimental to properties or improvements in the vicinity or to the general welfare of the City.
4. That the proposed project is exempt from the California Environmental Quality Act per Section 15182 (Pursuant to a Specific Plan) (California Public Resources Code section 21000, et seq.) and the Guidelines thereunder (14 California Code of Regulations section 15000, et seq.) (collectively, “CEQA”).
In evaluating the above findings, staff has determined each of the findings can be made by the City Council when taking into account the project description, Purpose and Intent of the General Plan Designation, the Waterfront District Specific Plan, as well as the proposed conditions of approval which are included as an exhibit to the resolution (Attachment 1).
STAFF RECOMMENDATION:
Staff recommends that the City Council conduct a public hearing, for the proposed multi-family project at 400 Main Street; and
1. Find the Project is Exempt from the California Environmental Quality Act (CEQA) Per Section 15182 for a Twenty-Unit Multi-Family Project Located at 400 Main Street (APN 0032-091-220).
2. Adopt Resolution No. 2025 - ____: Approving Planned Unit Development Application No. PLN- 00003 and Site Plan/Architectural Review Application No. PLN-00004 for a Twenty-Unit Multi-Family Residential Project at 400 Main Street (Assessor Parcel Number (APN) 0032-091-220).
DOCUMENTS ATTACHED:
1 .
Council Adoption of Resolution No. 2025-__: Approving Planned Unit Development Application No. PLN-00003 and Site Plan/Architectural Review Application No. PLN-00004 for a Twenty- Unit Multi-Family Residential Project at 400 Main Street (Assessor Parcel Number (APN) 0032- 091-220).
2 .
Project Application Materials.
3 .
Parking Survey
4 .
Draft Project Disclosure Document
5 .
Powerpoint Presentation.
PREPARED BY:
John Kearns, Principal Planner
REVIEWED BY:
Jim Bermudez, Deputy City Manager
APPROVED BY:
Bret Prebula, City Manager
ATTACHMENTS:
1. 400 Main Street Attachment 1.docx
2. 400 Main Street Application Materials Attachment 2
3. 400 Main Street Attachment 3.pdf
4. 400 Main Street Attachment 4.pdf
331
5. PPT 400 Main Street Attachment 5.pdf
332
FINAL DISCLOSURE DOCUMENT
Proposed 20-Unit Waterfront Apartment Development
400 Main Street – Suisun Marina, Suisun City, California Prepared for the Suisun City Planning Commission
Date: 06/17/2025
Prepared by: Sid Afshar, Sunfield Development, LLC
1. Introduction
This disclosure document accompanies the staff report submitted in support of the proposed 20-unit waterfront apartment project at 400 Main Street, Suisun City, CA. In response to Planning Commission guidance, this document outlines how the development will support public waterfront character, ensure visual quality, and disclose key conditions of occupancy to prospective tenants.
2. Project Overview
• Project Name: AWANTA
• Type: Multi-family residential (20 units)
• Developer: Sunfield Development, LLC
• Representative: Sid Afshar
• Architect/Planner:
Robert Sesar
Principal Architect
A2R Architects
• Zoning: Mixed-Use
• Waterfront Access: Directly adjacent to the Suisun Marina public promenade and walkways
3. Public Realm Integration
3.1 Pedestrian and Bicycle Connectivity
333
• Marina-adjacent walkways seamlessly integrated with existing public paths • Bike parking and street improvements to encourage non-vehicular access • Transparent edges and low fencing to support an open pedestrian experience
3.2 Visual and Physical Access
• Step-back building massing protects key waterfront view corridors • No physical barriers along the marina-facing perimeter • Public spaces remain accessible and connected visually to the water
3.3 Landscaping and Lighting
• Drought-tolerant and native planting for marina consistency • Downcast, warm lighting for safety and comfort
• No glare or spillover lighting into neighboring public walkways
3.4 Public Amenities
• Space identified for a potential bench or plaza area
• Opportunity for interpretive or historic signage facing the marina
4. Resident-Tenant Disclosure Plan
All tenants will receive a disclosure document at lease signing with the following key points:
4.1 Public Access Notice
Residents will be informed that the building borders a high-use public space, including walkways, boardwalks, and civic gathering areas.
4.2 Noise and Public Activity
Sound from boats, music, public events, and pedestrians may occur during evenings, weekends, and holidays. This activity is a core part of waterfront life.
334
4.3 View and Access Expectations
Residents will be notified that the waterfront views and amenities are shared public resources. No individual units will have exclusive rights to views, pathways, or access to marina frontage.
4.4 Community Engagement
Residents are encouraged to participate in civic efforts like waterfront cleanups, festivals, and environmental days that foster community ownership.
4.5 Visual Standards for Balconies and Exterior Spaces
To protect the visual integrity of the waterfront and maintain the development’s contribution to Suisun’s civic appearance, residents are strictly prohibited from displaying laundry, clothing, towels, household storage, or personal belongings on balconies, railings, patios, or other exterior areas visible to the public.
These areas are highly visible from public walkways and the marina. Maintaining a clean and orderly appearance contributes to the dignity and welcoming quality of the waterfront experience for all residents and visitors.
5. Response to Planning Commission Concerns
The development team has carefully considered Planning Commission concerns regarding transparency, public access, and the interface between private residences and the civic realm. In response:
• Public access will remain uninterrupted along the waterfront • The building’s massing preserves waterfront views
• All tenants will receive full disclosures regarding noise, activity, and behavior standards
• Exterior-facing balconies and patios will be regulated to prevent visual clutter
6. Conclusion
The proposed development at 400 Main Street reflects a community-centered design approach. It integrates new housing while prioritizing public access, view preservation, and shared waterfront pride. Sunfield Development, LLC is committed to working in step with the City of Suisun to maintain a visually dignified and accessible waterfront district. 335
Appendix A: Tenant Waterfront Disclosure Sheet
Waterfront Living Disclosure – [Project Name]
400 Main Street – Suisun Marina, Suisun City, CA
Developer: Sunfield Development, LLC
Contact: Sid Afshar
Waterfront Living Acknowledgment
As a tenant of a residence adjacent to the Suisun Marina, I acknowledge the following:
• I understand that the property borders a public marina, with walkways, community events, and recreational use.
• I accept that noise and activity may occur regularly, especially on weekends or holidays.
• I understand that marina views and walkways are shared with the public, and no exclusive rights are granted.
• I agree not to hang or display clothing, towels, laundry, storage bins, or personal belongings on any balconies, patios, or public-facing exterior areas. • I understand that these standards are in place to maintain a clean, dignified, and respectful public waterfront experience.
Resident Name: _______________________
Signature: ____________________________
Date: ________________________________
336
8/14/2025
1 Awanta Apartments City of Suisun City, City CouncilJohn Kearns, Principal PlannerAugust, 19, 2025(continued from July 15, 2025)1 Project BackgroundProject LocationSpecific Plan DesignationPlanned Unit Development Permit (PUD)Good Neighbor MeetingPlanning Commission Public Hearing1 2 337
8/14/2025
2 Driftwood DriveMain StreetProject SiteProject Location Proposed Project•2016 Waterfront District Specific Plan adopted•Amended in 2018, changed site designation from Public Facilities (PF) to Commercial/Office/Residential (C/O/R)•Parcel Size: 0.16 acres (6,969 square feet)•Proposed Units: 20•General Plan Designation: Downtown Waterfront Specific Plan•Zoning District: Downtown Waterfront Specific Plan [Commercial/Office/Residential (C/O/R)]•“Residential uses are also permitted to be developed as a “stand alone” development or as an integrated part of a commercial/office development.” [page3-9 of the Waterfront District Specific Plan] 3 4
338
8/14/2025
3 Site Plan
= Project Site= Relocated Trash EnclosureDriftwood DriveMain Street 5 6
339
8/14/2025
4 Elevations27’7”
Elevations Continued
Fiber cement staggered edge shingles Stone trim facadeTrimPrivate patios and balconiesDecorative corbelsDark bronze window frames and doors7 8 340
8/14/2025
5 Public/Private Interface
Analysis - PUD•Planned Unit Development Intent and Application Standard MetProposed ProjectWDSP StandardYes0’0’ min – 15’ maxFront SetbackYes0’0’ min – 5’ maxSide SetbackYes0’15’ (minimum)Rear SetbackYes27’7”50’ (max)HeightYes0*24Parking Spaces 9 10
341
8/14/2025
6 Analysis - SPAR•Housing Accountability Act (HAA) severely limits residential design of “housing projects” unless onlyobjective design guidelines are imposed•Project is considered a “housing project” under the HAA, therefore, City Council review of residential design is limited•Project would meet or exceed applicable design standards•Project uses a variety of materials and articulation•Units are oriented towards the waterfront and exterior creating an “urban” character typical of infill development•Each unit has private balcony/patio space General Plan Policies & Waterfront District Specific Plan•Project meets many General Plan and WDSP goals and policy•Refer to the August 19, 2025, Staff Report for comprehensive list•Examples•Focus higher density development and mixed-use projects in areas adjacent to the train/intermodal depot. •Strategically develop vacant, under-utilized, and infill land throughout the City, and especially in Downtown. •Foster transit-oriented development around the train/intermodal depot.•Policy CCD-4.3: New developments shall provide direct access routes to buildings from sidewalks and parking areas for pedestrians and bicyclists. •Policy CCD-7.2: New developments should front onto adjacent parks and open space, or provide windows, outdoor seating areas or other orientation to these features. 11 12
342
8/14/2025
7 Public Notice & Input•Good Neighbor Meeting (April 14, 2025)•Voluntary Neighborhood Meeting (August 6, 2025)•Issues raised:•Parking•Feasibility •Quality of life •Cost of rent Issues & Concerns•Parking•AB2097 (State Law) prohibits cities from imposing minimum parking requirements for residential projects that are within ½-mile of “high quality transit”. The Project is within ½-mile of a qualifying transit hub; therefore, the City may NOT impose required parking nor can the basis of a decision be related to parking.•Feasibility•Feasibility of the project is not necessarily in the purview of the City. The Project architect has drafted a plan that seemingly would meet or exceed applicable standards, and therefore, findings shall be made on the compliance with applicable regulations. •Quality of Life•Speculative quality of life concerns is not a legal basis for decision-making. Although the Project would be located near activity, this is common in many parts of the State, Country, and abroad. Also, quality of life is not a “finding” of approval that shall be made for basing a decision.•Cost of Rent•Any discussion of rental cost is not within the purview of the City and could run afoul of fair housing laws. The cost of rent is the business of the property owner/developer and should not be discussed and not be part of any decision-making on the project. 13 14
343
8/14/2025
8 Examples
HafenCity, Germany
Marina Bay, Qunicy, MA
ExamplesSparks, NV
Alameda County, CA15
16 344
8/14/2025
9 Conclusion•Project meets or exceeds many of the General Plan, and Waterfront District Specific Plan goals and policies by promoting infill residential development.•Issues and concerns raised were primarily those that are outside of the purview of the City for decision-making. Although some are valid concerns, State laws prohibit basing a decision on a residential project related to some of those concerns.•Housing is needed in downtown to help maintain existing businesses and support the local economy Required Findings1.That the proposed project along with the proposed conditions under which it would be operated or maintained will be consistent with the Suisun City General Plan, Title 18 “Zoning” of the Suisun City Municipal Code, and the Waterfront Specific Plan 2.That the proposed project along with the proposed conditions under which it would be operated or maintained will be consistent with the General Plan. 3.That the proposed project will not be detrimental to the public health, safety, or welfare of persons residing or working in or adjacent to the neighborhood of such use, nor detrimental to properties or improvements in the vicinity or to the general welfare of the City.4.That the proposed project is exempt from the California Environmental Quality Act per Section 15182 (Pursuant to a Specific Plan) (California Public Resources Code section 21000, et seq.) and the Guidelines thereunder (14 California Code of Regulations section 15000, et seq.) (collectively, “CEQA”). 17 18
345
8/14/2025
10 Conditions of Approval•As a result of discussion at the July 15, 2025, City Council, the Applicant has agreed to the following new conditions of approval:P-9 Applicant will work with Development Services Staff to explore and potentially revise the color scheme of the Project to ensure consistency with the character of the waterfront. However, the overall materials and building features shall remain the same as shown in the Project plans. P-10 Applicant shall not erect any type of fence or barrier that would otherwise close off the property. If, in the future, the Applicant would like to modify elevations of the Project, including adding fencing, the Project would have to comply with approval processes identified in the Suisun Municipal Code. P-11 Applicant voluntarily committed to exploring parking solutions for the Project with City Staff to potentially provide parking for the residents.
Staff Recommendation1.Find the Project is Exempt from the California Environmental Quality Act (CEQA) Per Section 15182 for a Twenty-Unit Multi-Family Project Located at 400 Main Street (APN 0032-091-220).2.Adopt Resolution No. 2025-___; A Resolution of the City Council of the City of Suisun City Approving Planned Unit Development No. PLN-00003 and Site Plan/Architectural Review No. PLN-00004 for a Twenty-Unit Multi-Family Residential Project at 400 Main Street (APN 0032-091-220).19 20 346
AGENDA ITEM NO. 14.
AGENDA TRANSMITTAL
MEETING DATE:
August 19, 2025
AGENDA ITEM:
Approving a Professional Services Agreement with Apex Technology Management, LLC.
a
.
Council Adoption of Resolution No. 2025-___: Approving a Professional Services Agreement with Apex Technology Management, LLC to Provide Information Technology Support Services for the City of Suisun City;
b
.
Council Adoption of Resolution No. 2025-___: Adopting the 2nd Amendment to the Annual Appropriation Resolution No. 2025-64 to Increase the Budget for Network Maintenance Internal Service Fund Contract with Apex Technology Management, LLC.
FISCAL IMPACT:
The agreement proposes a monthly cost of $14,090 and a one-time onboarding fee of $18,750, payable over 12 months. This results in an annual increase of about $200,000, to be allocated across all participating funds. The Network Internal Service Fund budget will be updated in the mid-year adjustment.
STRATEGIC PLAN:
Ensure a resilient and secure City infrastructure.
BACKGROUND:
The City of Suisun City currently maintains limited in-house information technology (IT) capacity and seeks to improve its IT support, cybersecurity posture, and operational uptime through a partnership with a specialized managed service provider. Apex Technology Management, LLC (“Apex”) is a top-ranked firm serving numerous California public agencies with 24/7 support, CLETS/CJIS-certified staff, and robust cybersecurity protocols.
This agreement establishes a co-managed IT services relationship with Apex to supplement internal capabilities and ensure critical systems are supported, secured, and responsive.
STAFF REPORT:
The proposed agreement includes the following key provisions:
Monthly Total Support Services at $14,090, including:
Gold-Level Support for 25 servers, including 24/7 monitoring, patch management, disaster recovery, and remote helpdesk.
Bronze-Level Support for 167 workstations, with escalation assistance, antivirus management, and patching.
Virtual CIO (vCIO) serv
ices, monthly IT strategy reports, and budgeting support.
Enterprise ticketing, monitoring, and remote desktop assistance.
One (1) quarterly on-site visit up to five hours.
Apex Security Essentials ($16.50/month per device)
Ring Fencing - Zero Trust
MDR
MultiFactor Authentication
Dark Web Monitoring
Password Manager
347
Security & Awareness Training
Self-Paced End-User Online Training for Productivity Applications One-Time Onboarding and Transition Fee of $18,750, which includes:
Network documentation and photo labeling.
Deployment of monitoring agents.
Network assessment and remediation planning.
Staff training and integration into Suisun's IT environment.
This amount may be split across the first 12 months at $1,562.50/month.
The partnership with Apex will enhance system reliability, improve user support response, and provide expert cybersecurity and infrastructure management at a scalable cost. The proposed services will replace any existing vendor arrangements and expand City capacity to handle current and future IT needs.
STAFF RECOMMENDATION:
It is recommended that the City Council adopt:
a
.
Resolution No. 2025-___: Approving a Professional Services Agreement with Apex Technology Management, LLC to Provide IT Support Services for the City of Suisun City; b
.
Resolution No. 2025-___: Adopting the 2nd Amendment to the Annual Appropriation Resolution No. 2025-64 to Increase the Budget for Network Maintenance Internal Service Fund Contract with Apex Technology Management, LLC.
DOCUMENTS ATTACHED:
1 .
Resolution Approving a Professional Services Agreement with Apex Technology Management, LLC to Provide Information Technology Support Services for the City of Suisun City; 2 .
Resolution Adopting the 2nd Amendment to the Annual Appropriation Resolution No. 2025-64 to Increase the Budget for Network Maintenance Internal Service Fund Contract with Apex Technology Management, LLC.
3 .
Apex Total Support Co-Managed Service Agreement
4 .
Apex Proposal (June 5, 2025)
PREPARED BY:
Rowland Roberts, IT Manager
REVIEWED BY:
Lakhwinder Deol, Finance Director
APPROVED BY:
Bret Prebula, City Manager
ATTACHMENTS:
1. Resolution Approving a Professional Services Agreement with Apex Technology Management, LLC to Provide Information Technology Support Services for the City of Suisun City
2. Resolution Adopting the 2nd Amendment to the Annual Appropriation Resolution No. 2025-64 to Increase the Budget for Network Maintenance Internal Service Fund Contract with Apex Technology Management, LLC
3. Apex Total Support Co-Managed Service Agreement
4. Apex Proposal
348
RESOLUTION NO. 2025 - ___
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SUISUN CITY
APPROVING A PROFESSIONAL SERVICES AGREEMENT WITH APEX
TECHNOLOGY MANAGEMENT, LLC TO PROVIDE INFORMATION
TECHNOLOGY SUPPORT SERVICES
WHEREAS, the City of Suisun City (“City”) seeks to enhance its information technology operations, infrastructure reliability, and cybersecurity posture; and WHEREAS, the City has identified the need to supplement its in-house IT resources through a co-managed services model that provides strategic, technical, and operational support; and
WHEREAS, Apex Technology Management, LLC (“Consultant”) has over 30 years of experience providing IT and cybersecurity services to municipal governments and public sector agencies across California; and
WHEREAS, Consultant will provide 24/7 monitoring and support services for servers and workstations, Virtual Chief Information Officer (vCIO) services, helpdesk support, on-site maintenance, and disaster recovery services, as detailed in the Consultant’s proposal dated June 5, 2025; and
WHEREAS, the City and Consultant desire to enter into a Professional Services Agreement with a monthly cost of $14,090, and a one-time onboarding fee of $18,750, which may be allocated in equal installments over the first 12 months of service; and WHEREAS, the total cost of the agreement is included in the FY 2025–26 City budget; NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Suisun City as follows:
1. Approval. A Professional Services Agreement between the City of Suisun City and Apex Technology Management, LLC is hereby approved, with a total monthly service fee of $14,090 and a one-time onboarding cost of $18,750.
2. Authorization. The City Manager is hereby authorized to execute the Agreement and any related documents or amendments, in a form approved by the City Attorney.
3. Effective Date. This Resolution shall take effect immediately upon its adoption.
PASSED AND ADOPTED at a Regular Meeting of said City Council of the City of Suisun City duly held on Tuesday, the 20th day of August 2025, by the following vote:
AYES: Councilmembers: _________________________________________ NOES: Councilmembers: _________________________________________ ABSENT: Councilmembers: _________________________________________ ABSTAIN: Councilmembers: _________________________________________ 349
WITNESS my hand and the seal of said City this 20th day of August 2025.
_______________________________________
Anita Skinner
City Clerk
350
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SUISUN CITY:
Increase/
(Decrease)
TO: Network Maintenance Internal Service Fund 200,000 $ Total 200,000 $
THAT account titles and numbers requiring adjustment by this Resolution are as follows:
Sources Uses
Revenue:
A/C No. 710-3320-70101 Network Maintenance Internal Srv Fund -Beginning Balance 200,000$ Appropriation:
A/C No. 710-3320-91412 Network Maintenance Internal Srv Fund -Contracts-IT 200,000 $ Total Fund 300 200,000$ 200,000 $
AYES: COUNCILMEMBERS
NOES: COUNCILMEMBERS
ABSENT: COUNCILMEMBERS
ABSTAIN: COUNCILMEMBERS
WITNESS my hand and seal of the said City this 19th day of August 2025.
Anita Skinner
City Clerk
ADOPTED AND PASSED at a regular meeting of the City Council of the City of Suisun City duly held on the 19th day of August 2025, by the following vote:
RESOLUTION NO. 2025-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SUISUN CITY ADOPTING THE 2nd AMENDMENT TO THE ANNUAL APPROPRIATION RESOLUTION NO. 2025-64 TO
INCREASE THE BUDGET FOR NETWORK MAINTENANCE INTERNAL SERVICE FUND CONTRACT WITH
APEX TECHNOLOGY MANAGEMENT, LLC
WHEREAS, On June 24, 2025, the City Council adopted the Annual Appropriation Resolution No. 2025-64 to appropriate from each of the several funds of the City to each Department of the City in the amounts set forth in the Annual Budget Business and Financial Plan for Fiscal Year 2025-26.
THAT the purpose is to appropriate additional funds into the budget to cover cost of new contract with APEX Technology Management, LLC for IT support services.
THAT the annual appropriation for the Park Development Fund is hereby amended as follows:
351
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 1 Apex T otal Support Co-Managed Service Agreement (Gold + Bronze) THIS AGREEMENT ("Agreement") is made by and between City of Suisun City (hereinafter called " Client" or “City” ) located at the address noted in the Execution section of this Agreement and Apex Technology Management, LLC, a California Limited Liability Company, (hereinafter called “Apex”), located at 310 Hemsted Drive, Suite 300, Redding, CA 96002.
1. Description of Services. In compliance with all terms, conditions and provisions of this Agreement, Apex shall provide Client with technology support services as listed in Exhibit “A” and Exhibit “B” attached hereto (hereinafter the "Services"). The Services may be amended from time to time with 28 days' notice and as modified on the existing Exhibits or a replacement Exhibit signed by Client and Apex.
2. Monthly Fee. The current monthly fee for the Services shall be $10,922.00 per month (the "Monthly Fee") and will be billed in advance on the first of every month. Any services provided outside the scope of Services will be billed separately as they are provided at Apex's then current billing rates. The current Monthly Fee is based upon the current configuration of the computers and LAN and WAN systems at the relevant Client facilities, as described in Exhibit A and Exhibit B of this Agreement. As a matter of course, Apex may recalculate the Monthly Fee to adjust for Workstations or Servers added to or removed from the Client's network using the per site base fee, per workstation fee, and per server fee, as listed on Exhibit A and Exhibit B of this Agreement. Systems removed from the network may not automatically be removed by Apex's auditing tool for up to 120 days, therefore it is the Client's responsibility to notify Apex if a Workstation or Server has been removed so that the monthly fee can be adjusted accordingly.
3. Method of Payment. Apex shall submit to City monthly invoices for all Services rendered pursuant to this Agreement. Such invoices shall be submitted within 15 days of the end of the month during which the Services were rendered and shall describe in detail the Services rendered during the period. The fixed monthly fee and all out-of scope work shall be listed. The out-of-scope work will include the days worked, number of hours worked, the hourly rates charged, and the Services performed for each day in the period. City will pay Apex within 30 days of receiving Apex’s invoice. City will not withhold any applicable federal or state payroll and other required taxes, or other authorized deductions from payments made to Apex.
4. Standard of Care. As a material inducement to City to enter into this Agreement, Apex hereby represents that it has the experience necessary to undertake the Services to be provided. In light of such status and experience, Apex hereby covenants that it shall follow the customary professional standards in performing all Services. City relies upon the skill of Apex, and Apex’s staff, if any, to do and perform the Services in a skillful, competent, and professional manner, and Apex and Apex’s staff, shall perform the Services in such manner. Apex shall, at all times, meet or exceed any and all applicable professional standards of care generally exercised by like professionals under similar circumstances and in a manner reasonably satisfactory to City. The acceptance of Apex’s work by the City shall not operate as a release of Apex from such 352
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 2 standard of care and workmanship.
5. Familiarity with Services. By executing this Agreement, Apex represents that, to the extent required by the standard of practice, Apex (i) has investigated and considered the scope and level of services to be performed, (ii) has carefully considered how the Services should be performed, and (iii) understands the facilities, difficulties and restrictions attending performance of the Services under this Agreement. Apex represents that Apex, to the extent required by the standard of practice, has investigated any areas of work, as applicable, and is reasonably acquainted with the conditions therein. Should Apex discover any latent or unknown conditions, which will materially affect the performance of services, Apex shall immediately inform City of such fact and shall not proceed except at Apex’s risk until written instructions are received from City’s Representative.
6. Compliance with Laws. In performing this Agreement, Apex shall comply with all applicable provisions of federal, state, and local law.
7. Additional Services. Apex will not be compensated for any work performed not specified in the Scope of Services unless City authorizes such work in advance and in writing. The City Manager may authorize extra work to fund unforeseen conditions up to the amount approved at the time of award by the City Manager.
Payment for additional work in excess of this amount requires prior City Manager authorization.
8. Term of Agreement: The term of this Agreement shall commence on September 1, 2025 and shall remain in full force and effect until August 31, 2026 unless sooner terminated as provided below.
A. Automatic Renewal: This Agreement shall renew automatically for successive one (1) year periods unless either party gives notice to the other in writing at least thirty (30) days prior to the anniversary date of this Agreement. If written notice of termination is provided to the other party at least 30 days prior to the anniversary date, then the agreement will terminate on the next anniversary date of the agreement. Each renewal of this Agreement shall be subject to the same terms and conditions in this Agreement except that upon each annual renewal the Monthly Fee (including the base fee, per workstation fee and per server fee) will increase by 3.5% to adjust for increased costs and inflation. Hourly fees will be billed at the then current billing rates and may be subject to change occasionally.
B. Termination: Either party may terminate this Agreement, with or without cause, at any time by giving sixty (60) days written notice of termination to the other party.
C. Default: If Client fails to pay the Monthly Fee and/or billed expenses promptly before or on the due date (15 days after the first of the month), Client will be deemed in default of this Agreement and Apex may terminate this Agreement upon ten (10) days written notice to Client. Should Apex choose not to terminate the Agreement, such decision on the part of Apex should not be deemed a waiver of any rights by Apex to collect any and all sums owed by Client.
9. Responsibilities of Client.
A. The Client must provide Apex with full access to all areas of the facility necessary to complete the 353
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 3 Services in a timely manner, including but not limited to physical spaces, passwords, keys and codes.
B. The Client must be able to provide documentation supporting ownership or licensing of all equipment and software. Apex will not install, support or troubleshoot unlicensed software.
C. The Client must provide a suitable work environment for Apex for any on -site services required, including desk space, access to a telephone and parking.
D. The Client shall maintain its hardware and software under a valid support agreement with the vendor or manufacturer of the hardware or software at all times. Apex shall not be responsible under this Agreement for installing, updating, maintaining, or supporting hardware or software not covered under a valid support agreement with the software vendor or manufacturer. Any such support will be separately billed at Apex's billing rate in effect at the time of service.
E. Unless otherwise provided by Apex, Client shall be responsible for maintaining backups of all critical software, documents, and applications on all of Client's file servers, personal PC's, organizers, and other electronic equipment.
F. The Client shall be solely responsible for changing backup media on the Servers.
G. Client must receive Apex's approval for any changes to the covered equipment. If Client does not receive Apex's approval for changes to the covered equip ment, any additional maintenance or support services required due to Client's changes to the covered equipment will not be covered by this agreement and will be billed separately at Apex's then current billing rates.
H. The Client is responsible for payment of invoices on or before the due date (15 days after the first of the month).
10. Expenses. Client shall reimburse Apex for the following expenses that are directly attributable to work performed pursuant to this Agreement:
A. A fixed $250.00 trip fee will apply for on-site support visits. (not charged for the included Quarterly Maintenance visit or VCIO visits) This fee covers travel time and mileage to and from the site. Overnight visits will incur lodging and meal charges and will be invoiced to the client.
Once on-site, out-of-scope service hours will be billed separately at the discounted Gold rates.
B. Telephone long-distance and facsimile (fax) long-distance charges.
C. Postage and courier services.
D. Computer services, such as hardware repairs and replacement of hardware necessary to complete the scope of services to be provided.
E. Other expenses resulting from the work performed under this Agreement.
F. Apex shall submit an itemized statement of Apex’s expenses, along with any associated invoices.
11. Confidentiality: Apex may have access to financial, accounting, statistical, and personnel data of individuals and City employees, trade secrets, and/or other information that may be protected under other applicable laws relating to privacy, confidentiality and/or privilege. Apex covenants that all Work Product (as defined in Subsection 11.1) and/or any other data, documents, writings, discussion or other information created, developed, received or provided by Apex for performance of this Agreement are confidential unless such information is in the public domain or already known to Apex.
Apex shall not release or disclose any such Work Product, data, documents, writings, discussion or other information to persons or entities other than City without prior written authorization by City. City shall grant such authorization if applicable law requires disclosure. Apex, its officers, employees, agents, servants, and/or 354
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 4 subcontractors shall not without written authorization from the City Manager or unless requested in writing by the City Attorney, voluntarily provide declarations, letters of support, testimony at depositions, response to interrogatories or other information concerning the Services performed under this Agreement or relating to any project or property located within City. Response to a subpoena or court order shall not be considered “voluntary,” provided Apex gives City timely notice of such court order or subpoena.
Apex shall promptly notify City should Apex, its officers, employees, agents, servants, and/or subcontractors be served with any summons, complaint, subpoena, notice of deposition, request for documents, interrogatories, request for admissions or other discovery request, court order or subpoena from any party regarding this Agreement and the work performed thereunder or with respect to any project or property located within City. City may, but has no obligation to, represent Apex or be present at any deposition, hearing or similar proceeding. Apex agrees to cooperate fully with City and to provide City with the opportunity to review any response to discovery requests provided by Apex. However, City’s right to review any such response does not imply or mean the right by City to control, direct or rewrite the response.
Apex’s covenants and obligations under this Section shall survive the termination or expiration of this Agreement.
12. Exclusions. The Services, including telephone support services, online technical support services, and on-site support services are for approved platforms, devices, operating systems, applications and other items.
All Services are subject to the following exclusions:
A. Apex may make recommendations for hardware, software or network improvements, referred to as special projects, to improve the level of support. If implementation of the recommendation is necessary to continue efficient and effective support, and the recommendation is not implemented, Apex reserves the right to exclude the item(s) needing replacement or repair from Services provided.
B. Services do not include any service after the equipment has been serviced, repaired, moved or relocated by anyone other than Apex or an authorized Apex agent. Services also do not include repair or service required as a result of:
1. Neglect, theft, or accidental damage of the equipment;
2. Alterations or modifications to the equipment performed by other than Apex or authorized Apex agent;
3. The failure of Client to provide and maintain a suitable installation environment at all facilities as prescribed by Apex (including, but not limited to, proper electrical power, air conditions, or humidity control);
4. The use of supplies or materials not meeting Apex's specifications;
5. The use of the equipment for purposes other than those for which it was designed;
6. Electrical work external to the equipment or service connected with equipment relocation, reconfiguration or additions;
7. Cutoff of services to Client by any utility;
8. Acts of God.
355
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 5 C. Software or Hardware not owned by the Client are specifically excluded.
D. Labor for troubleshooting, configuring or installing copy machines or any other hardware or peripherals provided by another 3rd party vendor.
E. Labor for troubleshooting, configuring or installing non business related software such as iTunes, and games.
F. Software or Hardware not covered under a valid maintenance contract or warranty with the vendor or OEM are specifically excluded.
G. Moves, Adds and Changes (“projects”) are not covered under this agreement and are separately billable.
13. Alterations to Services or Equipment. If Client alters any Services or Equipment conducted by Apex without the express written consent of Apex, Client does so at its own risk and expense. Apex shall not be liable or responsible for problems created as a result of Client's alteration of Services, Equipment and/or Client's network or system. If Client wishes Apex to correct or fix its alterations or problems relating thereto, such Services by Apex will be considered a new project and billed at then current project rates, and Client agrees that the same terms and conditions set out in this Agreement shall apply.
14. Response Times. Apex will respond to Client employee or self-discovered computer related service requests listed in the “Response Time Grid” in Exhibit “A” and Exhibit “B”.
15. Warranties.
A. Product Warranty: APEX IS NOT A HARDWARE MANUFACTURER OR SOFTWARE DEVELOPER, BUT A RESELLER, INTEGRATOR AND TECHNOLOGY MANAGEMENT SERVICE PROVIDER. ACCORDINGLY, APEX DOES NOT PROVIDE ITS OWN WARRANTIES FOR THIRD PARTY SOFTWARE OR HARDWARE. ALL
WARRANTIES, IF ANY, FOR THIRD PARTY PRODUCTS ARE ASSIGNED TO THE CLIENT FROM THE THIRD PARTY MANUFACTURER OR DEVELOPER. AS SUCH, APEX HEREBY DISCLAIMS ANY AND ALL
WARRANTIES, EXPRESS OR IMPLIED, INCLUDING ANY WARRANTIES OF FITNESS OR MERCHANTABILITY.
B. Services Warranty Apex warrants that Services will be performed in a manner consistent with customary practice in the industry. Should a failure to comply with this warranty appear within thirty (30) days after the date of completion of such Services, Apex shall, if promptly notified in writing, at its option, either provide the Services anew or refund to Client the price charged for such non - conforming Services. Such re -performance or refund(s) shall be Client's exclusive remedy and shall constitute fulfillment o f all liabilities of Apex with respect to any nonconformity of or defect or deficiency in Services furnished to Client.
The above Service Warranty is the only warranty provided by Apex relative to this Agreement.
ALL OTHER WARRANTIES, OF ANY TYPE, WHETHER EXPRESS OR IMPLIED ARE HEREBY DISCLAIMED AND 356
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 6 CLIENT ACKNOWLEDGES THEY ARE WAIVING THE ENFORCEMENT OF ANY SUCH WARRANTIES AS TO APEX BY ENTERING INTO THIS AGREEMENT.
16. Limitation of Liability. Client further agrees that Apex's liability, if any, for any breach of contract shall not exceed the insurance coverages for the portion of Services, Equipment, or Custom Software giving rise to such claim. APEX SHALL NOT BE LIABLE FOR SPECIAL, INDIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES UNDER ANY CIRCUMSTANCE OR THEORY OF LIABILITY. Without limiting the generality of the foregoing, Apex shall have no responsibility to compensate Client for delays in or loss of use of equipment, loss or miscalculation of data, loss of revenue or increased costs, loss of facilities, loss or delays in services, or claims of Client’s clients, or other third parties to whom it provides goods or services, loss of profits or revenue, cost of substitute goods, facilities or services, downtime costs, or delays.
17. Indemnification. Apex assumes all responsibility for damages of property or injury or death to persons caused by the negligence performance, errors or omissions of Apex, his agents or employees, or any equipment furnished under the Agreement or used by Apex, his/her agents and employees. To the extent permitted by law, Apex shall indemnify, hold harmless, release and defend Client, its officers, employees and agents from and against any and all actions, claims, demands, damages, disability, losses, failure to comply with any current, and expenses including attorney's fees and other defense costs or liabilities of any nature (referred to within this section as “Claims”) that may be asserted by any person or entity including Apex arising from any cause whatsoever including another's concurrent negligence arising out of or in any way connected with the activities of Apex, its employees and agents hereunder and regardless of Client’s negligence. Client agrees to provide Apex with reasonable notification of legal claims and/or lawsuits which Client may receive and which Client will request indemnification in under this paragraph.
This indemnification obligation is not limited in any way by any limitation on the amount or type of damages or compensation payable by or for Client under Workers' Compensation, Disability or other employee benefit acts, acceptance of insurance certificates required under this Agreement, or the terms, applicability or limitations of any insurance held by Client.
18. Insurance General Requirements. Apex shall not commence work under this Agreement until it has provided evidence satisfactory to City that Apex has secured all insurance required under this Section.
19. Minimum Scope and Limits of Insurance. Apex shall, at its sole cost and expense, procure, maintain and keep in full force and effect for the duration of the Agreement, insurance against claims for injuries to persons or damages to property that may arise from or in connection with the performance of this Agreement, as follows:
19.1 Commercial General Liability Insurance: Apex shall maintain limits no less than $2,000,000 per occurrence for bodily injury, death, personal injury and property damage; and if Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this Agreement/location or the general aggregate limit shall be twice the required occurrence limit: Coverage shall be at least as broad as the latest version of Insurance Services Office Commercial General 357
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 7 Liability coverage (occurrence form CG 0001). If Apex is a limited liability company, the commercial general liability coverage shall be amended so that Apex and its managers, affiliates, employees, agents, servants, and other persons necessary or incidental to its operation are insureds.
19.2 Automobile Liability Insurance: Apex shall maintain limits no less than $1,000,000 per accident for bodily injury and property damage. Coverage shall be at least as broad as Automobile Liability: Insurance Services Office Business Auto Coverage form number CA 0001, code 1 (any auto).
19.3 Workers’ Compensation Insurance in the amount required by law; and Employer’s Liability Insurance: with limits of at least $1,000,000 per accident and in the aggregate for bodily injury or disease.
19.4 Professional Liability (or Errors and Omissions) Liability Insurance: Apex shall maintain professional liability (or errors and omissions liability) insurance that covers the Services to be performed in connection with this Agreement, with minimum limits of $1,000,000 per claim/aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this Agreement. If a “claims made” policy is provided, then the policy shall be endorsed to provide an extended reporting period of not less than three years.
19.5 Cyber Security & Privacy Liability Insurance: Service Provider shall procure and maintain Cyber Security and Privacy Liability insurance with limits of $1,000,000 per occurrence and $2,000,000 general aggregate which shall include the following coverage:
(a) Liability arising from the theft, dissemination and/or use of confidential or personally identifiable information; including credit monitoring and regulatory fines arising from such theft, dissemination, or use of the confidential information.
(b) Network security liability arising from the unauthorized use of, access to, or tampering with computer systems, including hacker or denial of service attacks. (c) Liability arising from the failure of technology products (software) required under the contract for Service Provider to properly perform the services intended. (d) Electronic Media Liability arising from personal injury, plagiarism or misappropriation of ideas, domain name infringement or improper deep-linking or framing, and infringement or violation of intellectual property rights.
(e) Liability arising from the failure to render professional services.
19.6 Acceptability of Insurers. The Insurance policies required under this Section shall be placed with insurers with a current A.M. Best's rating no less than A:VIII, licensed to do business in California, and satisfactory to City.
19.7 Additional Insureds.
(a) For general liability insurance, City, its elected and appointed officials, officers, employees, agents, servants, volunteers, and those City agents serving as independent contractors in the role of City officials shall be covered as additional insureds with respect to the services or operations performed by or on behalf of the Apex, including materials, parts or equipment furnished in connection with such work. (b) For automobile liability insurance, City, its elected and appointed officials, officers, employees, agents, servants, volunteers and those City agents serving as independent contractors in the role of 358
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 8 City officials, shall be covered as additional insureds with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by the Apex or for which the Apex is responsible.
(c) These additional insured provisions shall also apply to any excess/umbrella liability policies.
19.8 Cancellations or Modifications to Coverage. The insurance policies shall contain the following provisions, or Apex shall provide endorsements on forms supplied or approved by City to state: (i) coverage shall not be suspended, voided, reduced or canceled except after 30 days (or ten days for nonpayment) prior written notice by certified mail, return receipt requested, has been given to City; (ii) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to City, its elected and appointed officials, officers, employees, agents, servants, volunteers, and those City agents serving as independent contractors in the role of City officials.
19.9 Primary and Non-Contributing. Coverage shall be primary insurance as respects City, its elected and appointed officials, officers, employees, agents, servants, volunteers, and those City agents serving as independent contractors in the role of City officials, or if excess, shall stand in an unbroken chain of coverage excess of the Apex's scheduled underlying coverage and that any insurance or self-insurance maintained by City, its elected and appointed officials, officers, employees, agents, servants, volunteers and those City agents serving as independent contractors in the role of City officials, shall be excess of the Apex's insurance and shall not be called upon to contribute with it.
19.10 Separation of Insureds. Each insurance policy shall contain standard separation of insureds provisions and shall not contain any special limitations on the scope of protection afforded to City, its elected and appointed officials, officers, employees, agents, servants, volunteers and those City agents serving as independent contractors in the role of City officials.
19.11 Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions shall be declared to and approved by City. Apex guarantees that, at the option of City, either: (i) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects City, its elected and appointed officials, officers, employees, agents, servants, volunteers and those City agents serving as independent contractors in the role of City officials; or (ii) Apex shall procure a bond guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.
19.12 Waiver of Subrogation. Each insurance policy required by this Agreement shall expressly waive the insurer’s right of subrogation against City, its elected and appointed officials, officers, employees, agents, servants, volunteers and those City agents serving as independent contractors in the role of City officials. Apex hereby waives its own right of recovery and all rights of subrogation against City; and shall require similar express written waivers from any subcontractor.
19.13 Enforcement of Agreement Provisions (Non-Estoppel). Apex acknowledges and agrees that any actual or alleged failure on City’s part to inform Apex of non-compliance with any insurance requirement does not impose additional obligations on City, nor does it waive any rights hereunder.
19.14 City Remedy for Noncompliance. If Apex does not maintain the policies of insurance required under this Section in full force and effect during the term of this Agreement, or in the event any of Apex’s 359
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 9 policies do not comply with the requirements under this Section, City may either immediately terminate this Agreement or, if insurance is available at a reasonable cost, City may, but has no duty to, take out the necessary insurance and pay, at expense, the premium thereon. Apex shall promptly reimburse City for any premium paid by City or City may withhold amounts sufficient to pay the premiums from payments due to Apex.
19.15 Evidence of Insurance. Prior to the performance of Services under this Agreement, Apex shall furnish City with original certificates of insurance and all original endorsements evidencing and effecting the coverages required under this Section on forms satisfactory to and approved by City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms provided by City if requested. Apex may provide complete, certified copies of all required insurance policies to City. Apex shall maintain current endorsements on file with City’s Risk Manager. All certificates and endorsements shall be received and approved by City before work commences. City also reserves the right to require complete, certified copies of all required insurance policies, at any time. Apex shall also provide proof to City that insurance policies expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Apex shall furnish such proof at least two weeks prior to the expiration of the coverages.
19.16 Insurance Requirements Not Limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type.
19.17 Broader Coverage/Higher Limits. No representation is made that the minimum insurance requirements of this Agreement are sufficient to cover the obligations of Apex under this Agreement. Apex may also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Services. If Apex maintains broader coverage and/or higher limits than the minimums required above, City requires and shall be entitled to the broader coverage and/or the higher limits maintained by Apex.
19.18 Timely Notice of Claims. Contractor shall give City prompt and timely notice of demands or claims made or suits instituted that arise out of or result from Contractor’s performance under this Agreement, and that involve or may involve coverage under any of the required insurance policies.
20. Independent Contractor. Apex is an independent contractor and not an employee of City. All work or other Services provided pursuant to this Agreement shall be performed by Apex or by Apex’s employees or other personnel under Apex’s supervision. Apex will determine the means, methods, and details by which Apex’s employees and other personnel will perform the Services. Apex shall be solely responsible for the satisfactory work performance of all personnel engaged in performing the Services and compliance with the customary professional standards.
All of Apex’s employees and other personnel performing any of the Services under this Agreement on behalf of Apex shall also not be employees of City and shall at all times be under Apex's exclusive direction and 360
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 10 control. Apex and Apex’s personnel shall not supervise any of City’s employees; and City’s employees shall not supervise Apex’s personnel. Apex’s personnel shall not wear or display any City uniform, badge, identification number, or other information identifying such individual as an employee of City; and Apex’s personnel shall not use any City e-mail address or City telephone number in the performance of any of the Services under this Agreement. Apex shall acquire and maintain at its sole cost and expense such vehicles, equipment and supplies as Apex’s personnel require to perform any of the Services required by this Agreement. Apex shall perform all Services off of City premises at locations of Apex’s choice, except (i) as otherwise required for the performance of Services on City real property, facilities, vehicles or equipment; (ii) as otherwise may from time to time be necessary in order for Apex’s personnel to receive projects from City.
Apex’s performance of any Services under this Agreement, or (iii) as may be necessary to inspect or visit City locations and/or private property to perform such Services. City may make a computer available to Apex from time to time for Apex’s personnel to obtain information about or to check on the status of projects pertaining to the Services under this Agreement.
In addition to all other provisions of this Agreement, Apex shall be responsible for and pay all wages, salaries, benefits and other amounts due to Apex’s personnel in connection with their performance of any Services under this Agreement and as required by law. Apex shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: Social Security taxes, other retirement or pension benefits, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance. Notwithstanding any other agency, State, or federal policy, rule, regulation, statute or ordinance to the contrary, Apex and any of its officers, employees, agents, servants, and subcontractors providing any of the Services under this Agreement shall not become entitled to, and hereby waive any claims to, any wages, salaries, compensation, benefit or any incident of employment by City, including but not limited to, eligibility to enroll in, or reinstate to membership in, the California Public Employees Retirement System (“PERS”) as an employee of City, and entitlement to any contribution to be paid by City for employer contributions or employee contributions for PERS benefits.
Apex shall defend, indemnify and hold harmless City, its elected and appointed officials, officers, employees, agents, servants, volunteers, and those City agents serving as independent contractors in the role of City officials, from any and all liability, damages, claims, costs and expenses of any nature to the extent arising from, caused by, or relating to Apex’s personnel practices. or to the extent arising from, caused by or relating to the violation of any of the provisions of this Section 9.0. In addition to all other remedies available under law, City shall have the right to offset against the amount of any fees due to Apex under this Agreement any amount due to City from Apex as a result of Apex’s failure to promptly pay to City any reimbursement or indemnification arising under this Section. This duty of indemnification is in addition to Apex’s duty to defend, indemnify and hold harmless as set forth in any other provision of this Agreement. Apex’s covenants and obligations under this Section shall survive the expiration or termination of this Agreement.
21. PERS Compliance and Indemnification General Requirements. The Parties acknowledge that City is a local agency member of PERS, and as such has certain pension reporting and contributions to PERS on behalf of qualifying employees. Apex agrees that, in providing its employees and any other personnel to City to perform any work or other Services under this Agreement, Apex shall assure compliance with the Public Employees’ Retirement Law (“PERL”), commencing at Government Code § 20000, as amended by the Public Employees’ Pension Reform Act of 2013 (“PEPRA”), and the regulations of PERS, as amended from time to 361
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 11 time. Without limitation to the foregoing, Apex shall assure compliance with regard to personnel who have active or inactive membership in PERS and to those who are retired annuitants and in performing this Agreement shall not assign or utilize any of its personnel in a manner that will cause City to be in violation of the PERL, PEPRA or any other applicable retirement laws and regulations.
22. Indemnification. To the maximum extent permitted by law, Apex shall defend, indemnify and hold harmless City, its elected and appointed officials, officers, employees, agents, servants, volunteers, and those City agents serving as independent contractors in the role of City officials, from any and all liability, damages, claims, costs and expenses of any nature to the extent arising from, caused by, or relating to Apex’s violation of any provisions of this Section 10.0. This duty of indemnification is in addition to Apex’s duty to defend, indemnify and hold harmless as set forth in any other provision of this Agreement. Apex’s covenants and obligations under this Section shall survive the expiration or termination of this Agreement.
23. Forum and Venue. The parties agree that this contract shall be governed and/or interpreted in accordance with the laws of the State of California. The parties agree that any disputes that arise out of this Agreement will be resolved in the jurisdiction of Solano County Superior Court or in the case of any matters having exclusive jurisdiction in federal court those matters shall be brought in the Eastern District of California of the United States District Court.
24. Party Representatives. The City Manager is City’s representative for purposes of this Agreement. ___________ is the Apex's primary representative for purposes of this Agreement. __________________ shall be responsible during the term of this Agreement for directing all activities of Apex and devoting sufficient time to personally supervise the Services hereunder. Apex may not change its representative without the prior written approval of City, which approval shall not be unreasonably withheld.
25. Notices. All notices permitted or required under this Agreement shall be deemed made when personally delivered or when mailed 48 hours after deposit in the United States Mail, first class postage prepaid and addressed to the party at the following addresses:
To City: City of Suisun City
701 Civic Center Blvd
Suisun City, CA 94585
Attn: City Manager
To Apex: Apex Technology Management, LLC
310 Hemsted Drive, Suite 300
Redding, CA 9600
Attn: ________________________
Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.
26. Permits and Licenses. Apex and all of Apex’s employees and other personnel shall obtain and maintain 362
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 12 during the Agreement term all necessary licenses, registrations, permits and certificates required by law for the provision of the Services under this Agreement, including a business license as required by the Suisun City Municipal Code.
27. Notices. Any notice, request, demand or other communication required or permitted by, or relating to, the terms of this Agreement shall be deemed to be properly given only when delivered to the United States Postal Service, sent certified mail -return receipt requested, or postage prepaid, or upon confirmation of receipt by facsimile, addressed to the party to receive notice as previously requested by notice hereunder or, otherwise, as provided in conjunction with such party's signature below.
28. Severability. Every provision of this Agreement is intended to be severable. If any portion of this Agreement or application thereof to any person or circumstance shall be declared invalid by a court of competent jurisdiction, or if it is found in contravention of any federal, state, or county statute, county code, or regulation, the remaining provisions of this Agreement, or the application thereof, shall not be invalidated thereby, and shall remain in full force and effect to the extent that the provisions of this Agreement are severable.
29. Waiver of Default. Waiver of any default by either party to this Agreement shall not be deemed to be a waiver of any subsequent default. Waiver of breach of any provision of this Agreement shall not be deemed to be a waiver of any other or subsequent breach, and shall not be construed to be a modification of the terms of this Agreement unless this Agreement is amended.
30. Force Majeure. Performance under this Agreement is subject to interruption and delay due to causes beyond the parties' reasonable control, such as acts of God, acts of any government, war or other hostility, including acts of terrorism, civil disorder, the elements, fire, explosion, power failure, equipment failure, industrial or labor dispute, inability to obtain necessary supplies and the like.
31. Authorized Representatives: The signatories below represent and warrant that they are authorized by their respective organizations to enter this Agreement.
32. Scanned or Facsimile Execution: This Agreement may be validly executed by the signing of a scanned, electronic or facsimile copy of this Agreement. Either the fully executed scanned copy, facsimile copy or a conforming executed original shall be evidence of the existence of this Agreement.
33. Counterparts: This Agreement may be executed in one or more counterparts, each of which will be deemed to be an original copy of this Agreement and all of which, when taken together, will be deemed to constitute one and the same Agreement.
34. Title and Risk Loss: Any Equipment sold to Client under this Agreement shall remain the personal property of Apex until fully paid for by Client, and Client agrees, if requested by Apex, to execute a security agreement covering the Equipment sold and to perform all acts which may be necessary to perfect and assure retention of title to such Equipment by Apex. Notwithstanding any agreement with respect to delivery terms 363
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 13 or payment of transportation charges, risk of loss or damage shall pass to Client and delivery shall be deemed to be complete upon delivery of the Equipment to Client, either by Apex or by a private or common carrier.
35. Assignment: Any assignment of this Agreement or any rights thereunder, without prior written consent of both parties by duly authorized representatives, shall be void; consent shall not be unreasonably withheld. Any purposed assignment, transfer or delegation without City’s consent shall entitle City to terminate this Agreement.
36. Miscellaneous: This Agreement shall not be modified in any way except in writing signed by both parties and stating expressly that it constitutes a modification of this Agreement. This Agreement embodies the entire understanding between the parties with respect to the subject matter of this Agreement, and except as otherwise provided herein, supersedes any and all prior understandings and agreements, oral or written, relating to the subject matter of this Agreement.
37. Non-Appropriation of Funds. Payments to be made to Apex by City for any Services performed within the current fiscal year are within the current fiscal budget and within an available, unexhausted fund. In the event that City does not appropriate sufficient funds for payment of Apex’s Services beyond the current fiscal year, this Agreement shall cover payment for Apex’s Services only to the conclusion of the last fiscal year in which City appropriates sufficient funds and shall automatically terminate at the conclusion of such fiscal year.
38. Mutual Cooperation City’s Cooperation. City shall provide Apex with all pertinent data, documents and other requested information as is reasonably available for Apex’s proper performance of the Services required under this Agreement.
39. Apex’s Cooperation. Apex agrees to work closely and cooperate fully with City’s representative and any other agencies that may have jurisdiction or interest in the work to be performed. In the event any claim or action is brought against City relating to Apex’s performance of Services rendered under this Agreement, Apex shall render any reasonable assistance that City requires.
40. Time of the Essence. Time is of the essence in respect to all provisions of this Agreement that specify a time for performance; provided, however, that the foregoing shall not be construed to limit or deprive a Party of the benefits of any grace or use period allowed in this Agreement.
41. Attorneys' Fees. If either party commences an action against the other party, either legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing party in such litigation shall be entitled to have and recover from the losing party all of its attorneys’ fees and other costs incurred in connection therewith.
42. Titles and Headings. The titles and headings used in this Agreement are for convenience only and shall in no way define, limit or describe the scope or intent of this Agreement or any part of it.
43. Recitals. City and Apex acknowledge that the above Recitals are true and correct and are hereby 364
For more information please call 530.248.1000 - Apex Technology Management, LLC. 310 Hemsted Drive, STE 300, Redding CA. 96002 14 incorporated by reference into this Agreement.
44. Exhibits. All exhibits referenced in this Agreement are hereby incorporated into the Agreement as if set forth in full herein. In the event of any material discrepancy between the terms of any exhibit so incorporated and the terms of this Agreement, the terms of this Agreement shall control.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of the effective date written above.
APEX:
Apex Technology Management, LLC
310 Hemsted Drive, Suite 300
Redding, CA 96002
Telephone: 530-248-1000 Fax: 530-243-9184
Name: Matthew Fristoe Title: President
Signature: Date:
CLIENT:
City of Suisun City
701 Civic Center Blvd.
Suisun City, CA 94585
Name: Title:
Signature: Date: _____________________
365
June 5, 2025
Co-Managed IT Services - Proposal
366
Experience and
Qualifications
TRANSFORMING
ORGANIZATIONS AND
LIVES THROUGH
INNOVATIVE TECHNOLOGY
SOLUTIONS
Since 1991, Apex has been providing
enterprise-class Managed IT & Cybersecurity
services to the Public Sector. Passionate
about providing best-in-class service to our
clients, we are committed to continuously
investing in the architecture, design, and
security of our technology solutions.
Cyber74 is the Advanced Cybersecurity
division of Apex Technology Management.
We work together with you to identify,
address, and combat threats through
advanced tools and custom, comprehensive
cybersecurity programs.
APEX TECHNOLOGY MANAGEMENT Cyber74
Safe, Secure and Stable
367
3 368
Years in Business
Dedicated focus on
Municipal Government
and Special Districts
Help Desk Support
Technical team
members with
CJIS/CLETS
Ranked in the “Top 5
MSPs for Government and
Education” 5-years
running
Star Google Review
Rating
Recognized as a Top Tier U.S. based Industry
Leader in Security, Operational Maturity,
Transformation and Satisfaction, Apex has
been providing enterprise-class services to
Municipal Government clients for over 32
years. Ranked in the Top 5 of all Municipal
Government MSP’s for the past five years.
We are committed to maintaining a Client-
Obsessed company culture. Your success is our
mission.
Active and engaged with Public Sector
Associations such as CSMFO, Cal League of
Cities, the FBI and Insurance JPA’s.
End-user satisfaction is critical in serving our
clients. We focus on hiring people that can
compassionately handle the technology but
also the people using it.
Endpoints Managed
32 20+
5000+
5-Years
24/7 5
Why Apex
369
Our Services
370
Public Sector Strategic Advisory Council
Meets quarterly to refine our services and address emerging challenges for our public sector clients. The members of this council are all former public sector employees. • Former Assistant Chief of Police, Beverly Hills
• Police Captain, City of Sacramento (1994 - 2017)
• President, California Peace Officers’ Association (2017 - 2019) • Former City Manager for the City of Clayton
• Former Assistant City Manager for the City of San Pablo • Began her Public Policy Career with California State Legislative Analyst’s Office • Former Chief of Police for the Novato Police Department • Martinez Police Department
• Walnut Creek Police Department
• Former Treasurer/Tax Collector for T ehama County
• Served as the IT Liaison to the MSP’s for T ehama County • Former Vice President/Controller of a regional savings and loan Marc Coopwood
Reina Schwartz
Beth Johnson
Dana Hollmer
371
Industry Recognition – including Government rankings
372
Microsoft Certs held by Apex Engineers
• 6 MCP (Microsoft Certified Professionals)
• 5 MCSA (Microsoft Certified Systems Administrator)
• 3 MCSA (Microsoft Certified Solutions Associate)
• 3 MCSE (Microsoft Certified Systems Engineer)
• 5 MCSE (Microsoft Certified Solutions Expert)
• 5 MCITP (Microsoft Certified IT Professional)
• 1 MCDST (Microsoft Certified Desktop Support Tech.)
• 1 MCT (Microsoft S Certified Technician)
• 18 MCTS (Microsoft Certified Technology Specialist)
Citrix Certs held by Apex Engineers
• 1 CCE-V (Citrix Certified Engineer – Virtualization)
• 1 CCEE (Citrix Certified Enterprise Engineer)
• 4 CCA (Citrix Certified Administrator-XenApp 6.5)
COMPTIA Certs held by Apex Engineers
• 2 COMPTIA A+, 2 COMPTIA Network+, 2 COMPTIA
Security+
CISCO Certs held by Apex Engineers
• 6 CCNA (Cisco Certified Network Associate)
• 3 CCNP (Cisco Certified Network Professional)
• 1 CCENT (Cisco Certified Entry Network Technician)
• 1 CCDP (Cisco Certified Design Professional)
• 1 CCDA (Cisco Certified Design Associate)
• 1 CTSS (Cisco Technical Sales Specialist)
• 1 CMNA (Cisco Meraki Network Associate)
VMware Certs held by Apex Engineers
• 2 VCP (VMware Certified Professional) 6.5
• 1 VCT (VMware Certified Technician)
• 1 VTPA (Virtualization Tech Post-Sales Accreditation) • 1 VMware vSphere Systems Design
• 2 VSP (VMware Sales Professional)
Staff/Technical Expertise
373
Security Team Certifications
16 Security Experts 52+ Security Specific Certifications 3 Certified Ethical Hackers 1 Computer Hacking Forensic Investigator In-House SOC (Security Operations Center) 350+ Security Assessments Completed 1 AlienVault Certified Security Engineer (AVSE) 1 GIAC Foundational Cybersecurity T echnologies - GFACT 1 CEH Master 3 GIAC Security Essentials Certification – GSEC 2 CEH (Certified Ethical Hacker) 1 GIAC Certified Incident Handler (GCIH) 2 Certified Wireless Network Expert – CWNE 1 GIAC Certified Cyber Threat Intelligence (GCTI) 2 Cisco Certified Network Associate Security - CCNA
Security 1 GIAC Certified Reverse Engineering Malware (GREM) 3 CCNA R&S 2 Microsoft Certified Azure Security Engineer Associate 5 CISSP 1 Microsoft Certified: Security Operations Analyst Associate 1 COMPTIA Advanced Security Practitioner (CASP+) 4 Cybersecurity Maturity Model Certification Accreditation Body (CMMC AB-RPO) 4 COMPTIA A+ 1 VMWare Carbon Black App Control Administrator 1 COMPTIA CySA+ 1 VMware Carbon Black Cloud Endpoint Standard Associate Analyst 2 COMPTIA Linux + 1 VMware Carbon Black EDR Advanced Analyst 2 COMPTIA PenTest+ 1 VMware Carbon Black EDR Introductory Analyst Certificate 3 COMPTIA Security+ 2 Offensive Security Certified Professional (OSCP) 1 COMPTIA Full Stack (Sec+ to CASP+) 1 Computer Hacking Forensic Investigator (CHFI) 3 COMPTIA Network+ 1 Web Application Penetration T ester (eWPT)
9 374
A Few Client Examples
City of Martinez
City of Clayton
City of Benicia
Town of Tiburon
City of Dixon
City of Rio Vista
City of Mt Shasta
City of Red Bluff
County of Tehama
City of Fillmore
City of Willits
City of Lakeport
City of St. Helena
Solano County Water Agency
Transportation Authority of Marin
West County Wastewater
Shasta Regional Transportation Agency
Modoc County Transportation Authority
Shasta Mosquito & Vector Control District
Butte County Association of Governments
Keyes Community Services District
Feather River Recreation & Park District
Cordova Recreation & Park District
Marin-Sonoma Mosquito & Vector Control District
375
Apex T otal Support
Our Award-Winning Managed and Co-Managed Services
consist of four (4) key elements that all work together to provide stress-free IT.
1. Virtual Chief Information Officer (VCIO)
2. Remote IT Monitoring & Management T ools
3. Remote Help Desk Support
4. On-Site Support
11 376
Virtual CIO (vCIO)
• Strategic IT Planning and Budgeting assistance (5-Year) • Needs Analysis and Solution Evaluation and Recommendations • Regular meetings with Management team & Monthly Executive Reports • Project Planning and Management assistance (together with our full- time Project Manager)
• Relationship Management, Service escalations & personalized care • IT Policies, Procedures, Standards Development, Procurement and Purchasing
• IT Resource Management (licensing, inventories, warranties, etc.) • Coordination and Management of third-party technology vendors 12 377
Remote Monitoring & Management
A key aspect of Apex’s service is proactive monitoring, alerting, and patching of the Client’s network. Apex installs a small software agent on the Client’s supported devices, which monitors over 75 different metrics around the clock.
Most IT issues will be automatically detected early by this enterprise-class IT Remote Monitoring & Management
(RMM) software. When a monitoring alert is triggered, it automatically generates a Help Desk service ticket in our fully integrated CRM, Ticketing and IT Management software, ConnectWise. The Help Desk then fulfills their role in
addressing IT issues (described on the next page). We also manage and apply all Microsoft OS patches.
13 378
Remote Help Desk
• California-based Remote Help Desk.
• Staffed from 8:00am-5:00pm, Monday-Friday, excluding holidays. (Live Answering Service and On-Call Technicians after hours) • Suisun IT staff can escalate any ticket to the Help Desk – billable hourly at reduced rates.
• Our staff understand non-technical users
• Technicians log in remotely and address the user’s I.T. issues • Escalation to Level II and Level III technicians available • Tickets are also created by our monitoring software and will be assigned to Suisun IT staff if they are workstation/end-user based. • Tickets are prioritized and assigned by our Scheduling Coordinator • Technicians are able to address over 95% of I.T. issues remotely. • For the other 5% of the time, there’s On-Site Support 14 379
On-Site Support
With Apex’s enterprise-class remote Help Desk support in place, the vast majority of the Client’s IT needs will be addressed remotely (typically over 95%). However, there are those periodic issues that do require a technician’s physical, on-site presence.
In this case Apex technicians will reach out to Suisun IT staff. If they are not available, or prefer Apex to handle the issue, we can be dispatched to address the issue as needed. This time would be billable at discounted hourly rates.
One (1) quarterly on-site maintenance visit up to five (5) hours by your lead technician and VCIO is included: Additional on-site hours are available and billed at discounted hourly rates. 15 380
Project Services
Total Support Plans cover the ongoing support and maintenance of a client’s existing IT environment
• Anything else is considered a Project
• New Hardware configuration and installation
• New software configuration and installation
• Server upgrades of more than two hours
• “Materials” are also not covered under Total Support: Hardware, software, warranties, special projects, monthly subscriptions and/or cloud service charges would be billed separately. For example:
Office 365, Email SPAM Filtering, cloud backups etc. Costs for these can be provided if necessary.
16 381
Apex Security Essentials – Keeping you safe
382
Support Tracking &
End User Experience
18 383
—Dana Hollmer,
Treasure/Tax Collector
Tehama County
We are committed to maintaining a Client-Obsessed company culture. Your success is our mission.
I don't know where
we would be without
the support Apex has
provided to us.
—Bonnie Kubowiez,
Executive Director
Great Northern Services
We always feel
treated as
if we’re the only and
best customer.
—Karina Lap, CPA
Managing Partner
Hathaway, Ksenzulak &
Lapp, LLP
Having 24/7
monitoring gives me
peace of mind that
allows me to sleep at
night.
What Our Clients Say
19 384
Scope of services:
Servers (Gold Service)
• Server Backup Monitoring (Suitable backup system provided by client. Client responsible for media rotation)
• Unlimited 9x5* Remote Helpdesk Support
• Remote Disaster Recovery
• Remote Support
• Remote Maintenance
• Event Log Monitoring
• Monitor Drive Space On All Supported Servers
• 24x7 Monitoring Of Server Availability
• 24x7 Monitoring Of Critical Devices & Services
• 24x7 Emergency Support
• Microsoft Operating System Patch Management (Patches, Updates & Service Packs) as needed
• MDR/Anti-Virus Subscription Monitoring, Response, Quarantine & Removal (Client must maintain current subscription)
20 385
Scope of services:
Network Infrastructure (Gold Service)
• Unlimited 9x5* Remote Helpdesk Support
• Management of Router & Firewall Rules
• Existing Wireless Access Point Configuration & Maintenance • Virtual Private Network (VPN) & Wide Area Network (WAN) Monitoring • Key Network Element Configuration Backup
Workstations (Bronze Service - primary support handled by Suisun IT staff) • Escalation Point for Helpdesk Support – billed hourly at discounted rates • Microsoft Operating System Patch Management (Patches, Updates & Service Packs) as needed
• MDR/Anti-Virus Subscription Monitoring, Response, Quarantine & Removal (Client must maintain current subscription)
21 386
Scope of services:
Applications (Gold Service on servers)
• Microsoft Exchange/365
• Microsoft SQL Server
• Two hours included per month for Application Updates
• Network Application Updates/Upgrades (Anti-virus, Anti-SPAM, Anti-Spyware, Etc.) End User Support (Bronze Service - primary support handled by Suisun IT staff) • Escalation Point for Helpdesk Support – billed hourly at reduced rates 22 387
Scope of services:
Network Administration (Gold Service)
• Network Policy Enforcement
• SPAM (junk email) software management, if provided by Apex • Network & VPN access administration
Security (Gold Service)
• 24/7 Firewall monitoring & alerting option
• Network Policy Enforcement
• MDR/Anti-Virus Subscription Monitoring, Response, Quarantine & Removal (Client must maintain current subscription)
• Security management
Best-In-Class Support & Monitoring Tools
• Enterprise level monitoring & reporting
• Trouble-ticket tracking & reporting – Suisun IT staff can have a dedicated board for tickets • Knowledge base
• Central monitoring/network operations center console
23 388
Scope of services:
Planning, Budgeting & IT Management
• Assigned Virtual Chief Information Officer (VCIO)
• Monthly executive summary report
• Strategic technology consulting
• Technology planning
• Technology budgeting
• Disaster recovery planning
• Trouble ticketing
• Problem escalation & resolution
• Assistance with Vendor selection & management
• IT purchasing
• Warranty management of covered devices
• Create and maintain an inventory of hardware, software and network equipment (reports available upon request)
• Assistance with grant requests
• Monthly management meeting or council meeting participation 24 389
*NOTES:
Prices quoted above include pricing for 25 servers with Gold Service and 167 workstations/laptops with Bronze service. Additional servers can be added at any time for $256.00/month each. Additional workstations/laptops can be added at any time for $22.00/month each.
During onboarding, the actual number of devices will be determined and reconciled. The monthly Total Support charge will be updated to reflect accordingly.
Projects, Monthly subscriptions and/or Cloud service charges would be billed separately. For example: Office 365, Email SPAM Filtering, Cloud Backups etc. Costs for these can be provided if necessary. $10,922.00
MONTHLY: Total Support Gold Servers
and Bronze Workstations: $18,750.00
ONE-TIME:
Transition and
Onboarding
Level 1: $120.00/HR | Level 2: $140.00/HR | Level 3: $165.00/HR HOURLY RATES: Out-of-scope & On-Site
Includes one (1) quarterly on-site maintenance visit
up to 5 hours (5) hours
Can be split over the initial 12-months of the
agreement for $1,562.50/month
390
One-Time Transition and Onboarding Scope of Work:
• Evaluation on transition of services from in-house staff or previous provider • Installation of monitoring agents on all covered devices • Creating the client’s monitoring and alerting profile • On-site labeling and photo/video network reference documentation • Documentation of client inventory and system configurations into RMM Tools • Technical team training and familiarization with client’s IT environment • Initial Network Assessment and Prioritized Remediation Recommendations • If remediation is needed, your VCIO will include the costs in your IT budget • Includes all travel costs for the onboarding
26 391
$3,168.00*
$16.50/month per device
MONTHLY Cost:
● Ring Fencing - Zero Trust ● Password Manager
● MDR ● Security & Awareness Training
● MultiFactor Authentication ● Self-Paced End-user online Training ● Dark Web Monitoring for Productivity Applications (365 etc.) Includes:
* Based on 25 servers and 167 workstations.
Apex Security Essentials provides a crucial layer of protection against cyber threats and protects organizations with the tools they need to monitor and manage devices on a network. Endpoint security delivers a critical layer of protection against cyber threats such as malware, viruses, and unauthorized access.
392
Questions?
28 THANK YOU
393