Last Updated in May 2020
City Council Adoption: April 8, 2025
City of Sunnyvale, Environmental Services Department, Water and Sewer Systems Division (CIWQS WDID: 2SSO10200)
2025 Sewer System
Management Plan
Prepared by HydroScience Engineers
Attachment 2
www.hydroscience.com
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
Page I
www.hydroscience.com
TABLE OF CONTENTS
ELEMENT 1. GOAL AND INTRODUCTION ................................ ................................ ............1-1
1.1 SSMP Implementation and Update Schedule ................................ ............................1-2
1.2 System Goals ................................ ................................ ................................ ............1-2
1.3 Sewer System Asset Overview ................................ ................................ ..................1-4 ELEMENT 2. ORGANIZATION ................................ ................................ ............................... 2-1
2.1 Organization and Staffing ................................ ................................ ..........................2-1 ELEMENT 3. LEGAL AUTHORITY ................................ ................................ .........................3-1
3.1 Sunnyvale Municipal Code (SMC) ................................ ................................ .............3-1
3.2 Coordination ................................ ................................ ................................ ..............3-2 ELEMENT 4. OPERATION AND MAINTENANCE PROGRAM ................................ ...............4-1
4.1 Updated Map of Sanitary Sewer System ................................ ................................ ...4-1
4.2 Preventive Operation and Maintenance Activities ................................ ......................4-2
4.3 Staff and Training ................................ ................................ ................................ ......4-4
4.4 Equipment Inventory ................................ ................................ ................................ .4-5 ELEMENT 5. DESIGN AND PERFORMANCE PROVISIONS ................................ .................5-1
5.1 Design Criteria and Construction Standards and Specifications ................................ 5-1 ELEMENT 6. SPILL EMERGENCY RESPONSE PLAN ................................ ..........................6-1 ELEMENT 7. SEWER PIPE BLOCKAGE CONTROL PROGRAM ................................ ..........7-1
7.1 Nature and Extent of Blockage Problem ................................ ................................ ....7-1
7.2 Blockage Control Program ................................ ................................ ........................7-1 ELEMENT 8. SYSTEM EVALUATION, CAPACITY ASSURANCE, AND CAPITAL IMPROVEMENTS................................ ................................ ................................ 8-1
8.1 System Evaluation and Condition Assessment ................................ ..........................8-2
8.2 Capacity Assessment and Design Criteria ................................ ................................ .8-2
8.3 Prioritization of Corrective Action and Capital Improvement Plan .............................. 8-2 ELEMENT 9. MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS ............9-1
9.1 Performance Measures ................................ ................................ .............................9-1
9.2 Performance Monitoring and Program Changes ................................ ........................9-4 ELEMENT 10. INTERNAL AUDITS ................................ ................................ ....................... 10-1
10.1 Audits ................................ ................................ ................................ .................... 10-1
10.2 SSMP Updates ................................ ................................ ................................ ...... 10-2
10.3 Annual Reports................................ ................................ ................................ ...... 10-2 ELEMENT 11. COMMUNICATION PROGRAM ................................ ................................ ..... 11-1
11.1 Communication with the Public ................................ ................................ .............. 11-1
11.2 Communication with Connected Systems ................................ .............................. 11-2 Note: Element numbers are based on SWRCB General Order, dated December 6, 2022.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
Page II
www.hydroscience.com
LIST OF FIGURES
Figure 1-1: Sewer Service Area Boundary ................................ ................................ .............. 1-6 Figure 9-1: Spills by Volume ................................ ................................ ................................ ... 9-3 Figure 9-2: Spills by Cause ................................ ................................ ................................ ..... 9-4
LIST OF TABLES
Table 1-1: SSMP Implementation and Update Schedule ................................ ......................... 1-2 Table 1-2: Service Connection Types ................................ ................................ ..................... 1-5 Table 1-3: Sewer System Gravity Pipeline Size Distribution ................................ .................... 1-7 Table 1-4: Sewer System Gravity Pipeline Materials of Construction ................................ ...... 1-8 Table 1-5: Privately Owned Laterals ................................ ................................ .......................... 8 Table 3-1: Summary of Legal Authorities in SMC and Other Sources ................................ ..... 3-1 Table 4-1: Annual Preventive Maintenance Activities ................................ .............................. 4-2 Table 4-2: Collection System Staff Maintenance Resources ................................ ................... 4-4 Table 7-1. FSE Inspection and Enforcement ................................ ................................ ........... 7-3 Table 9-1: Annual Spill Statistics ................................ ................................ ............................. 9-2 Table 9-2: Spills by Cause ................................ ................................ ................................ ...... 9-4
LIST OF APPENDICES
Appendix 2
Appendix 3
Appendix 4A
Appendix 4B
Appendix 4C
Appendix 5
Appendix 6
Appendix 7
Appendix 8A
Appendix 8B
Appendix 10A
Appendix 10B
City Staff Responsibility for SSMP Elements
Legal Authority
Standard Operating Procedure (SOP) for Sewer Cleaning
SOP for CCTV Inspections
2024 Tailgate Schedule for Corp Yard
City Standards, Details, and Specifications
City of Sunnyvale Sanitary Sewer Spill Emergency Response Plan City of Sunnyvale Pretreatment Inspection Enforcement Response Plan City of Sunnyvale Wastewater Collection System Model Expansion and Capacity Analysis
City of Sunnyvale FY 2023/24 Budget and Resource Allocation Plan – Wastewater
SSMP Change Log
SSMP Formal Adoption Documents
Note: Appendix numbers are based on corresponding General Order Element numbers.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
Page III
www.hydroscience.com
DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
BACWA Bay Area Clean Water
Agencies
A government agency of local clean water agencies that provide sanitary sewer services to people living in the San Francisco Bay Area, founded to assist member agencies in carrying out mutually beneficial projects.
BMP Best Management
Practices
Refers to the procedures, methods, or techniques that have been determined to be the most effective and most practical means of achieving a stated goal. Herein, this is used in reference to commercial kitchens working to minimize the quantity of grease that is discharged to the sanitary sewer system as well as facilities aiming to manage the quantity and improve the quality of stormwater runoff.
Cal OES California Office of
Emergency Management
All Category 1 spills greater than or equal to 1,000 gallons must be reported to Cal OES.
CCTV Closed Circuit Television Refers to the process and equipment used to inspect the condition of gravity sewers.
CIP Capital Improvement Plan,
Program
Refers to the document that identifies future capital improvements to the City’s sanitary sewer system.
City Refers to the City of Sunnyvale.
CIWQS California Integrated Water
Quality System
Refers to the SWRCB online electronic reporting system used to report spills, certify completion of the SSMP, and provide information on the sanitary sewer system.
CMMS Computerized Maintenance
Management System
Refers to a database application used to manage and document maintenance activities of a collection system.
CSRMA California Sanitation Risk
Management Authority
A Joint Powers Authority of wastewater service agencies that work together to provide coverage and comprehensive risk management services for all members through innovative solutions and knowledge transfer.
CWEA California Water
Environment Association
An organization of wastewater professionals from all facets of wastewater management and resource recovery (operators, lab techs, engineers, etc) providing training and raising awareness of the profession.
ESD City of Sunnyvale
Environmental Services
Department
The Environmental Services Department includes the City’s Water and Sewer Systems, Water Pollution Control Plant, Solid Waste and Recycling, and Regulatory Programs Divisions.
FOG Fats, Oils, and Grease Typically associated with food preparation and cooking activities that can cause blockages in the sanitary sewer system.
FSE Food Service
Establishment
Refers to commercial or industrial facilities where food is handled/prepared/served that discharge to the sanitary sewer system.
FTE Full-Time Equivalent Refers to the equivalent of 2,080 paid labor hours per year by a regular, temporary, or contract employee.
General
Order
Refers to the SWRCB updated Statewide Waste Discharge
Requirements (WDRs) for sanitary sewer systems, Order WQ 2022- 0103-DWQ, adopted December 6, 2022.
GIS Geographical Information
System
Refers to the City’s system used to capture, store, analyze, and manage geospatial data associated with the City’s sanitary sewer system assets.
GPS Global Positioning System Refers to the handheld unit used to determine the longitude and latitude of sanitary sewer overflows for use in meeting CIWQS reporting requirements.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
Page IV
www.hydroscience.com
DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
I/I Infiltration/Inflow Refers to water that enters the sanitary sewer system from storm water and groundwater and increases the quantity of flow. Infiltration enters through defects in the sanitary sewer system after flowing through soil. Inflow enters the sanitary sewer without flowing through the soil. Typical points of inflow are holes in manhole lids and direct connections to the sanitary sewer (e.g. storm drains, area drains, and roof leaders).
Lateral Refers to the piping that conveys sewage from a building to the City sewer system. The distinction is sometimes made between the upper lateral (from building to public right-of-way) and the lower lateral (from public right-of-way to the sewer main).
LRO Legally Responsible Official Refers to the individual designated by the City to certify spill reports on the CIWQS system. The LRO must be formally designated by the City and registered with the SWRCB.
O&M Operations and
Maintenance
Refers to the activities that keep facilities, equipment, and systems running effectively and safely.
PACP Pipeline Assessment and
Certification Program
Refers to the National Association of Sewer Service Companies (NASSCO) widely used standard for pipeline defect identification and assessment, providing standardization and consistency to the methods in which pipeline conditions are identified, evaluated and managed.
RWQCB Regional Water Quality
Control Board
Refers to the San Francisco Bay Regional Water Quality Control Board.
SCADA Supervisory Control and
Data Acquisition
Refers to the system employed by the City that monitors the performance of its pump stations and notifies the operating staff when an alarm condition requires attention.
SERP Spill Emergency Response
Plan
Refers to the City’s Plan, which is a component of this SSMP, that addresses the City’s response to spill events.
SMC Sunnyvale Municipal Code The City of Sunnyvale’s legal ordinances and laws which develop the legal framework for how the City operates.
SSMP Sewer System
Management Plan
Refers to this document, developed as a tool to facilitate management, operation, and maintenance of the sewer collection system in order to reduce and prevent spills and mitigate any that occur.
SWRCB State Water Resources
Control Board
Refers to the government entity and staff responsible for protecting the State’s water resources.
Water of
the State
Refers to any water, surface or underground, including saline waters, within the boundaries of California. In case of a sewage spill, storm drains are considered contiguous with Waters of the State unless the sewage is completely contained and returned to the sewer system.
May also be referred to as surface water(s) or State waterway.
WPCP Sunnyvale Water Pollution
Control Plant
The City’s wastewater treatment plant located at the northern end of Borregas Ave on the northern edge of City limits.
WDRs Waste Discharge
Requirements
Regulations from the SWRCB that control the discharge of waste into the land, surface water, and groundwater in the State of California in order to protect the quality of water used for drinking and recreation as well as the habitat of fish and other aquatic life.
WDID waste discharger
identification number
A number assigned to each facility discharging to a body of water, issued by the SWRCB.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 1. GOAL AND INTRODUCTION
On December 6, 2022, t he State Water Resources Control Board (SWRCB) adopted new Statewide Waste Discharge Requirements (WDRs) for sanitary sewer systems: Order WQ 2022- 0103-DWQ (General Order) , which include updated requirements for development and/or updating of a Sewer System Management Plan (SSMP) . The General Order is included as Appendix B of the City’s Spill Emergency Response Plan (SERP) which is attached as Appendix
6. This document, prepared by the City of Sunnyvale (City) Environmental Services Department (ESD), serves as an update to the City’s 2020 SSMP to meet the new requirements of the General Order. In July 2024, Bay Area Clean Water Agencies (BACWA) published the Guide for Developing and Updating of Sewer System Management Plans (2024 SSMP Guide) which was used to aid in the development of this document. The City’s waste discharger identification number (WDID) in the California Integrated Water Quality System (CIWQS) is 2SSO10200.
The SSMP contains a compendium of the policies, procedures, and activities describing the planning, management, operation, and maintenance of the City’s sanitary sewer system. The structure (element numbering and nomenclature) of this SSMP follows the requirements set forth in the General Order. Throughout this SSMP, each element begins with the relevant excerpt from the General Order that lists the requirements for that element as shown below for Element 1.
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
1. SEWER SYSTEM MANAGEMENT PLAN GOAL AND INTRODUCTION
The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and mitigate spills that do occur.
The Plan must include a narrative Introduction section that discusses the following items:
1.1. Regulatory Context
The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates.
1.2. Sewer System Management Plan Update Schedule
The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.
1.3. Sewer System Asset Overview
The Plan Introduction section must provide a description of the Enrollee -owned assets and service area, including but not limited to:
• Location, including county(ies);
• Service area boundary;
• Population and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons;
• Structures diverting stormwater to the sewer system;
• Data management systems;
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals;
• Estimated number or percent of residential, commercial, and industrial service connections; and • Unique service boundary conditions and challenge(s).
• Additionally, the Plan Introduction section must provide reference to the Enrollee’s up-to-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of this Attachment.
1.1 SSMP Implementation and Update Schedule
Table 1-1 provides a schedule for all upcoming SSMP update and implementation activities. This includes all internal audits and full SSMP updates for the next six years. Some of the action items listed in this table are detailed later in this report, though they are compiled here for ease of viewing the schedule.
Table 1-1: SSMP Implementation and Update Schedule
Action Item Monitoring Period To Be Completed By Frequency Category 4 Spill Reporting Prior calendar year Feb 1 Annually SERP Updates Prior calendar year April 1 Annually
Annual Report Prior calendar year April 1 Annually
SERP Annual
Assessment
Prior calendar year June 5 Annually
SSMP Audit Prior three calendar years November 2 Every three years, beginning 2027
SSMP Update Prior six calendar years May 2 Every six years, beginning 2025
1.2 System Goals
This section identifies goals the City has set for the management, operation, and maintenance of the sewer system and discusses the role of the SSMP in supporting these goals . These goals provide focus for City staff to continue the high -quality work to implement the improvements in the management and maintenance of the City’s wastewater collection system.
Providing safe, responsive, and reliable sewage conveyance is a key component of the goals and objectives of the City’s ESD, Wastewater Collections Program. The City’s Wastewater Collections Program has adopted the goals listed below which outline responsibilities and provide direction and understanding for all sewer maintenance and cleaning activities:
• Provide for the reliable collection of sewage throughout the City to protect public health and the environment, to prevent sanitary sewer spills (spills), and to minimize odors; • Ensure all sanitary sewage is collected and transported to the Sunnyvale Water Pollution Control Plant (WPCP);
• Maintain and repair the City’s Sanitary Sewer Collection System in a cost -effective, safe, reliable, and timely manner;
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
• Comply with all applicable federal, state, and local laws and regulations pertaining to sanitary sewer collection operation and maintenance;
• Respond to emergency events and provide assistance for residents and businesses; • Provide sewer collection services in the Rancho Rinconada area located in the City of Cupertino;
• Provide administrative and support services to promote customer satisfaction and confidence; • Continue to professionally manage, operate, and maintain all parts of the sewer collection system;
• Provide adequate capacity to convey peak flows;
• Minimize the frequency of spills that can pose a threat to public health; and • Mitigate the impact of spills that may occur notwithstanding the preventive efforts of the City.
This SSMP supplements and supports the City’s existing Operations and Maintenance Program and goals by providing high-level, consolidated guidelines and procedures for all aspects of the City’s wastewater system management . The SSMP guides the proper management of the collection system and assist s the City in minimizing the frequency and impacts of spills by providing direction for appropriate maintenance, capacity management , and emergency response.
General Plan
The City’s General Plan , which was consolidated in 2011, contains Goals and Policies for wastewater collection and treatment which are detailed in Chapter 7: Environmental Management of the City’s General Plan web page (https://www.sunnyvale.ca.gov/your-government/codes-and- policies/general-plan) and listed below:
• GOAL EM-5 Minimal Pollution and Quantity of Wastewater Ensure that the quantity and composition of wastewater generated in the city does not exceed the capabilities of the wastewater collection system or and the water pollution control plant. • POLICY EM-5.1 Water pollution control plant improvements should be designed, constructed and maintained and the quantity of industrial wastes should be controlled so that the plant does not have to be expanded in excess of its capacity of 29.5 MGD. • POLICY EM-5.2 Ensure that wastes discharged to the wastewater collection system can be treated by existing treatment processes of the water pollution control plant. • GOAL EM-6 Effective Wastewater Collection System
Continue to operate and maintain the wastewater collection system so that all sewage and industrial wastes generated within the city are collected and conveyed under safe and sanitary conditions to the water pollution control plant.
• POLICY EM-6.1 Inspect critical points in the wastewater management system annually to ensure that the proper level of maintenance is being provided and that the flow in sewers does not exceed design capacity.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
• GOAL EM-7 Effective Wastewater Treatment
Continue to operate and maintain the water pollution control plant, using cost effective methods, so that all sewage and industrial wastes generated within the city receive sufficient treatment to meet the effluent discharge and receiving water standards of regulatory agencies. • POLICY EM-7.1 Monitor water pollution control plant operations and maintenance to meet regulatory standards.
• POLICY EM-7.2 Coordinate operating procedures with the city energy policy to optimize an alternative energy program so that minimum use and reliance are placed on outside energy sources.
• POLICY EM-7.3 Actively participate in the watershed management approach to solving water quality issues of the Santa Clara Basin watershed and the South Bay. • POLICY EM -7.4 Produce quality recycled water and seek to maximize the use of this resource.
1.3 Sewer System Asset Overview
The City is located in Santa Clara County at the south end of the San Francisco Bay. It is an urban, industrial, and residential community serving a population of approximately 157,566 within approximately 23 square miles.
The City maintains a record of its assets within a Geographical Information System (GIS) geodatabase that includes information for wastewater collection system assets including: gravity line segments, manholes, pumping facilities, and pressure pipes (force mains). The City also has GIS information for the storm drainage system. A collection of block maps is maintained on the City’s website that detail the sewer and storm drainage systems, located at the following link:
https://www.sunnyvale.ca.gov/city-services/online-services/maps-and-gis/utility-maps.
The City is in the process of implementing a computerized maintenance management system (CMMS) for purposes such as generating work orders, tracking sewer pipeline maintenance issues, and other operations and maintenance (O&M)-related functions. The new CMMS system is planned to be operational in 2025.
The City provides wastewater service to all customers within City limits as well as portions of the City of Cupertino to the south of the City known as the “Rancho Rinconada” area. In 2022, the City diverted sewer flow from a portion of Rancho Rinconada ( 91 homes) in the area west of E .
Estates Drive and north of Bollinger Road to flow into Cupertino Sanitary District (CuSD)’s collection system. The wastewater previously flowed through an aging pipeline suspended over Calabazas Creek which is slated for removal. A new diversion system was implemented which consisted of construction of 20 feet of new 8-inch pipeline at E. Estates Drive, install ation of a diversion weir in a CuSD manhole to reroute approximately 15% of the combined flow, and refurbishment of existing infrastructure such as repair of an unused 8-inch pipe along S. Tantau Avenue.
A breakdown of the number of service connections by customer type is provided in Table 1-2.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
Table 1-2: Service Connection Types
Land Use Type Number of Connections Number as Percentage Residential 28,133 94%
Commercial 1,691 6%
Industrial 28 < 1%
Total 29,852 100%
The sewer service area boundary is presented in Figure 1-1. Wastewater is treated at the WPCP where it is either distributed back to the City for recycled water uses or discharged to the San Francisco Bay (Bay) under NPDES Permit No. CA0037621.
The total collection system is about 310 miles of gravity pipeline – approximately 296 miles within City limits and 14 miles in the Rancho Rinconada area – ranging in size from 4 -inch to 48-inch diameter. Within the City, there are approximately 10,719 feet of force main, 5 pump stations, and 11 active siphons.
Table 1-3 and Table 1-4 provide breakdowns of the existing pipelines by diameter and material, respectively, according to the City’s GIS records. Data regarding the exact age of the City’s sewer system is inexact; however, the average age is estimated t o be over 50 years for City pipelines based on the City’s incorporation in 1902, development records, historical population growth, and GIS records, and 70 years for Rancho Rinconada pipelines based on development records.
In addition, there are nearly 20 miles of privately -owned sewers tributary to the system included in the City’s GIS, plus additional private sewers not in GIS associated with Lockheed Martin and mobile home parks.
A map of the sanitary sewer system is included in Appendix A of the SERP (see Appendix 6).
Sewer Service Laterals: Sewer service laterals within the City’s collection system are owned by, and therefore the responsibility of, the property owner to maintain and assure serviceability.
The City may provide maintenance services to laterals located within the public right-of-way as a courtesy service to City and Rancho Rinconada residents only if a property line cleanout exists, and the cleanout and adjacent area are accessible to City staff and equipment . The City may provide maintenance, repair, rehabilitation, and/or replacement of the “lower” portion of private sanitary sewer laterals within the City that are located within the public right -of-way on a discretionary basis. The City does not install any type of cleanout on private sewer laterals.
Table 1-5 lists the number of laterals within the City and Rancho Rinconada.
Attachment 2
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
Table 1-3: Sewer System Gravity Pipeline Size Distribution Diameter (inches) Length (feet) Length (miles) Length as Percentage < 8 256,722 48.6 15.7%
8 902,108 170.9 55.0%
10 163,886 31.0 10.0%
12 114,312 21.7 7.0%
14 6,542 1.2 0.4%
15 55,688 10.5 3.4%
16 4,602 0.9 0.3%
18 43,051 8.1 2.6%
21 25,119 4.8 1.5%
22 387 0.1 < 0.1%
24 19,602 3.7 1.2%
27 23,624 4.5 1.4%
30 98 0.0 < 0.1%
33 4,223 0.8 0.3%
36 2,376 0.4 0.1%
39 9,558 1.8 0.6%
42 4,711 0.9 0.3%
48 3,167 0.6 0.2%
Unknown 320 0.1 < 0.1%
Total 1,640,096 310.6 100.0%
Source: City of Sunnyvale GIS, 2025
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
Table 1-4: Sewer System Gravity Pipeline Materials of Construction Material Length (feet) Length (miles) Length as Percentage ABS 32 0.0 < 0.1%
CIP 9,528 1.8 0.6%
Concrete Pipe 9,055 1.7 0.6%
DIP 709 0.1 < 0.1%
PE 23,576 4.5 1.4%
PVC 31,501 6.0 1.9%
RCP 16,374 3.1 1.0%
VCP 1,500,645 284.2 91.5%
Unknown 48,676 9.2 3.0%
Grand Total 1,640,096 310.6 100.0%
Source: City of Sunnyvale GIS, 2025
Notes:
1. ABS = Acrylonitrile Butadiene Styrene
2. ACP = Asbestos Cement Pipe
3. CIP = Cast Iron Pipe
4. CMP = Corrugated Metal Pipe
5. DIP = Ductile Iron Pipe
6. PE = Polyethylene
7. PVC = Polyvinyl Chloride
8. RCP = Reinforced Concrete Pipe
9. VCP = Vitrified Clay Pipe
Table 1-5: Privately Owned Laterals
City of Sunnyvale Rancho Rinconada
Estimated Number of Laterals 25,277 1,720
Stormwater: Portions of the City’s sanitary sewer system also collect stormwater from two principal sources:
1. A known pipe cross connection from the storm drain system to the sanitary system on Borregas Avenue at E. Weddell Drive; and
2. Direct stormwater discharges from the Northrup Grumman property near Fair Oaks Avenue and E. California Avenue.
While the City cannot accurately quantify the stormwater flows entering the sanitary system from these sources, estimates were developed for evaluating their potential impact on sanitary sewer pipeline capacity as part of the City’s2022 Wastewater Collection System Model Expansion and Capacity Analysis (Capacity Analysis), included as Appendix 8A.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 2. ORGANIZATION
This section of the SSMP identifies City staff responsible for implementing this SSMP, responding to spill events, and meeting the spill notification and reporting requirements. This section also discusses the designation of the Legally Responsible Official (LRO) who is responsible for completing and certifying spill repo rts submitted to the SWRCB’s on -line reporting system (CIWQS).
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
2. ORGANIZATION
The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organization chart or similar narrative documentation that includes:
• The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of this General Order;
• The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements; • Organizational lines of authority; and
• Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county health officer, county environmental health agency, and State Office of Emergency Services.)
2.1 Organization and Staffing
The organization chart for the City’s ESD, Water and Sewer Systems Division is provided in Appendix C of the SERP (see Appendix 6), and phone number for key positions are provided on the organization chart; general responsibilities for each position are described below.
Description of General Responsibilities
ESD Director: Under administrative direction, the ESD Director provides overall management of the ESD, consisting of the WPCP, Water and Sewer Systems, Solid Waste Programs, and Regulatory Programs Divisions. Along with the City Manager, City Attorney, and other Department heads, the ESD Director serves as a member of the City’s Executive Leadership Team.
Water and Sewer Systems Division Manager : Under administrative direction, the Water and Sewer Systems Division Manager provides general direction to the Water and Wastewater Operations Programs; they may act as the ESD Director in the Director’s absence or at the Director’s discretion.
Wastewater Operations Manager (Senior Environmental Engineer): Under general direction from the Water and Sewer Systems Division Manager, the Wastewater Operations Manager manages the operation of the City’s wastewater and stormwater collection systems. This is a management level classification in which the incumbent plans, organizes, directs, and coordinates the activities of the wastewater and stormwater collection system programs.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
Wastewater Collections Supervisor : Under general direction from the Water and Sewer Systems Division Manager and the Wastewater Operations Manager, the Wastewater Collections Supervisor supervises the activities of lead personnel, field crews , and other individuals in the maintenance and repair of public utilities operated by the ESD. Positions in this classification are characterized by an intermediate structure where work activities change considerably from day - to-day, or even hour-to-hour, but typically within some reasonable or expected bounds. Contacts are regularly made both inside and outside the organization at all organizational levels and require considerable tact, discretion, and persuasion skills to obtain willing action and consent.
Wastewater Collections Crew Leader: Under direction, the Wastewater Collections Crew Leader works with and leads field crews and individuals in the maintenance and repair of public utilities including, but not limited to, storm drains, sanitary sewers, and water systems; they also perform other related work as required . Incumbents in this classification typically receive assignments from the higher-rated classification of Wastewater Collections Supervisor and may receive direction from the managerial classification of Wastewater Operations Manager.
Senior Wastewater Collections Worker: Under general direction, Senior Wastewater Collections Workers perform skilled manual tasks in the construction, repair, and maintenance of sanitary sewers, storm drains, and supporting facilities; they operate motorized equipment , occasionally lead small field crews, and perform other related work as required.
Maintenance Worker I and II : Under general supervision , Maintenance Workers perform a variety of semi-skilled and skilled manual tasks in the construction, repair , and maintenance of sanitary sewer and storm drain facilities; they operate motorized equipment and perform other related work as required.
Crew Assignments
The Wastewater Operations Manager oversees the entire Program. The Wastewater Collections Supervisor oversees the day-to-day operation. The Wastewater Collections Crew Leaders and Senior Wastewater Collections Workers generally rotate duties that include leading crews, operating hydro-flushers, operating CCTV equipment , locating underground utilities, and being on-call. Hydro-flushing, CCTV, locating, pump and lift station preventive maintenance, and general maintenance and construction duties are shared among Senior Utility Workers and Maintenance Workers.
The construction crew makes needed repairs to the City sanitary sewer system, including but not limited to : mains, l aterals, pump/lift stations, manholes, and property line clean outs . A construction crew typically consists of three employees.
The hydro-flushing crews perform all cleaning of C ity sewer mains up to 15 inches in diameter using high-pressure water. A hydro-flushing crew consists of two employees on a hydro-flushing truck. The City ’s equipment is able to clean sewer mains up to 15 inches in diameter . As previously noted, cleaning of larger pipelines, as well as siphons, must be contracted out.
The CCTV crew performs televising and condition assessment of the sanitary sewer collection system piping using a robotic pipe inspection camera system and software . A CCTV crew consists of two employees.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
The on-call service tech receives and responds to sanitary and storm sewer calls and emergency response requests for wastewater and other issues as required.
One employee is assigned to underground utility locating duties and marks all city underground utilities prior to excavation as required by regulations. Underground utilities owned and maintained by the City include water, sewer, stormwater, street light conduits, etc. This employee typically shares the televising of wastewater laterals duties, when needed.
Legally Responsible Official (LRO)
The City’s authorized representative in all wastewater collection system matters is the ESD Director. The Water and Sewer Systems Division Manager is authorized to act in the Director’s absence.
The City typically has at least t wo individuals designated as LROs for purposes of CI WQS reporting and certification , and at least two additional employees designated as CIWQS data submitters. E ach of these positions and their contact information are identified on the City’s organization chart in Appendix C of the SERP (see Appendix 6).
Responsibility for SSMP Implementation
The ESD Director is responsible for implementing all elements of this SSMP. The ESD Director coordinates with the Department of Public Works Director regarding construction of new City- owned sewer facilities and rehabilitation of existing sewer facilities . The table in Appendix 2 indicates the City staff responsibilities for each SSMP element.
Spill Response and Reporting Chain of Communication
The spill reporting process is described in Element 6. The chain of communication for responding to spills from reporting it at the time of observation to reporting it to the appropriate agencies , including all necessary contact information, is provided in the City’s SERP which is included as Appendix 6.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 3. LEGAL AUTHORITY
This section of the SSMP discusses the City’s legal authority, including references to relevant sections of the Sunnyvale Municipal Code (SMC) and agreements with other agencies.
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
3. LEGAL AUTHORITY
The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
• Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure;
• Require that sewer system components and connections be properly designed and constructed; • Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee;
• Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and • Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.
3.1 Sunnyvale Municipal Code (SMC)
The SMC, Chapter 12, contains the City’s current legal authorities. The legal authorities provided by the SMC and other sources that address the regulatory requirements are summarized in Table 3-1, and all references are included as Appendix 3.
The City’s legal authority does not require the control of infiltration and inflow (I/I) from private service laterals. However, I/I is not currently a significant issue for the City. An evaluation and discussion of I/I in the collection system using flow monitoring data is included in the 2022 Capacity Analysis included as Appendix 8A.
Table 3-1: Summary of Legal Authorities in SMC and Other Sources Requirement SMC Reference Meets General
Order Requirements
General
Require that sewers and connections be properly designed and constructed
Section 12.08.010 and
Chapter 16.24
Yes
Require proper installation, testing, and inspection of new and rehabilitated sewers
Chapter 16.24,
Section 18.12.150,
and City Std. Specs.
Yes
Maintenance and Inspection, Including Laterals
Clearly define City responsibility and policies City Council Policy No.
3.3D.6
Yes
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
Requirement SMC Reference Meets General
Order Requirements
Ensure access for maintenance, inspection, or repairs for portions of the service lateral owned or maintained by the City Sections 18.08.040 (f),
18.12.150 (a),
and 18.12.080(a)
Yes
Blockage Source Control
Prevent illicit discharges into the wastewater collection system Section 12.12.020 Yes Limit the discharge of fats, oils, and grease (FOG) and other debris that may cause blockages
Sections 12.12.020,
12.12.025,
and 12.12.026
Yes
Requirements to install grease removal devices (GRDs),
design standards for the GRDs, maintenance, BMP, record keeping, and reporting requirements
Section 12.12.026 Yes
Authority to inspect grease producing facilities Sections 12.12.026 and 12.12.260
Yes
Enforcement
Enforce any violation of sewer ordinances Section 12.18.090 Yes
3.2 Coordination
Easement Accessibility Agreements: The City has easement accessibility agreements in order to access collection system infrastructure that is located outside of the public right of way. These agreements are stored on -site for easy access by City staff, as needed, for any necessary emergency repairs and/or O&M work.
Stormwater Agency Coordination: The City owns and operates the storm drain system within the City boundaries. The storm system is maintained and managed by the same crew, which means the crew has immediate access to the drainage conveyance system within City limits and can contain and recover spills immediately without having to coordinate with external agencies.
Should a spill happen in the Rancho Rinconada portion of the collection system or otherwise flow outside of City limits, the spill would cross into the Santa Clara Valley Water District (Valley Water) stormwater service area. In this case, City staff would contact Valley Water to coordinate necessary cleanup activities.
Agreements with Satellite Agencies : The City has informal mutual aid agreements with the neighboring cities of Santa Clara, Los Altos, and Mountain View. The City will continue to assist any surrounding cities when requested, if able.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 4. OPERATION AND MAINTENANCE PROGRAM
This section provides an overview of the City’s sewer system O&M program.
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
4. OPERATION AND MAINTENANCE PROGRAM
The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.
4.1. Updated Map of Sanitary Sewer System
An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.
4.2. Preventive Operation and Maintenance Activities
A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors.
The scheduling system must include:
• Inspection and maintenance activities;
• Higher-frequency inspections and maintenance of known problem areas, including areas with tree root problems;
• Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes.
The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to root-intrusion potentially resulting in system backup and/or failure.
4.3. Training
In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training must cover:
• The requirements of this General Order;
• The Enrollee’s Spill Emergency Response Plan procedures and practice drills; • Skilled estimation of spill volume for field operators; and • Electronic CIWQS reporting procedures for staff submitting data.
4.4. Equipment Inventory
An inventory of sewer system equipment, including the identification of critical replacement and spare parts.
4.1 Updated Map of Sanitary Sewer System
The field crews use GIS database maps on mobile devices . Block maps presenting the data stored in the GIS database are available at the following link:
https://www.sunnyvale.ca.gov/city-services/online-services/maps-and-gis/utility-maps The maps include all wastewater facilities including, but not limited to:
• Pipe material, diameter, and direction of flow for both gravity and pressurized pipes; • Upstream and downstream pipe invert elevations, where available; Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
• Manholes, including rim elevations, where available; and • Pump stations.
The City has developed and implemented an ongoing system for updating sewer asset maps.
Field crews note corrections to the maps which are transmitted to a GIS consultant, and the consultant makes corrections in the GIS maps. The updated maps are then reviewed by City staff before being entered into the production database.
The link provided above also includes detailed block maps for the City’s stormwater conveyance system.
4.2 Preventive Operation and Maintenance Activities
The elements of the City’s sewer system O&M program include:
• Proactive, preventive, and corrective maintenance of gravity sewers; • Pipeline and manhole inspections;
• Rehabilitation and replacement (R&R) of sewers that are in poor condition; and • Periodic inspection and preventive maintenance of pump stations.
Currently, the City has three combination unit crews, one construction crew, one CCTV crew, one on-call personnel, and one utility locating personnel. Table 4-1 summarizes the total length of gravity pipelines cleaned and inspected over the past ten years. It is noted that there are pipelines in identified hot spot areas that are cleaned more than once annually; the lengths listed may include some reaches counted more than once.
Table 4-1: Annual Preventive Maintenance Activities
Parameter 2014/
15 2015/
16 2016/
17 2017/
18 2018/
19 2019/
20 2020/
21 2021/
22 2022/
23 2023/
24 Total length of
gravity pipeline (mi)
310 310 310 310 310 310 310 310 310 310
Total length cleaned
(mi)
173 227 149 151 119 135 183 181 135 117
Total length
inspected (mi)
30 39 34 31 35 25 20 15 15 29
Gravity Sewers
The City has three combination (hydro/vacuum) units used for the cleaning or maintenance of its sewer mains which can clean pipelines up to 15 inches in diameter; cleaning of larger pipelines, as well as siphons, must be contracted out. With current funding and staffing levels, the City proactively cleans the sewe r system every three to five years, and preventively cleans sewers with a history of issues on enhanced frequency cleaning intervals of two, three, or six months depending upon the specific condit ions in individual segments . Approximately 270,000 feet or Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
about 17% of the system are currently in the enhanced frequencies category. The City also contracts for the treatment of some lines that have a history of issues with roots. Currently about 35,000 feet are treated annually.
Gravity sewer maintenance is currently scheduled using maps and lists of enhanced frequency cleaning line segments. Completed sewer maintenance is recorded in field crew daily reports. A CMMS is currently in development and is planned for implementation in 2025 . This CMMS will be used to generate work orders, track history for most sewer line maintenance issues, and provide other O&M-related functions. The City’s Standard Operating Procedure (SOP) for sewer cleaning is included as Appendix 4A.
Pipeline and Manhole Inspections
Prior to April 2012, t he City used an outside contractor for CCTV inspection services for both periodic condition assessment and for follow-up after spill events. In April 2012, the City obtained its own CCTV equipment truck . ESD staff now conduct inspections in-house with assistance provided by contractors as necessary. ESD staff have been trained in the use of the CCTV equipment. The City’s SOP for CCTV inspections is included as Appendix 4B. City staff that operate the CCTV equipment are trained and certified in the NASSCO PACP coding system that is used internationally to assess and grade the condition of pipelines.
The past several years, the City has experienced staffing shortages and equipment failures which has hampered their ability to keep up with prior pipeline inspection goals. The City has, however, made strides to improve the quality and quantity of inspections: in early 2018, the City installed new hardware and software (GraniteNet) in the CCTV truck and incorporated the latest improvements to the GIS system which has reduced the time required to complete each CCTV inspection. The City has also teamed with SewerAI to speed up the inspection process, and they have increased the number of NASSCO PACP -certified operators from four to ten. It is anticipated that these improvements will help improve the quality of inspection and inspection capacity. The current inspection cycle is approximately 10-12 years, which has largely minimized spills and successfully mitigated them when they have occurred. The City intends to continue to inspect the entire collection system using CCTV every 10 years . This provides an achievable goal for full inspection of the system that provides adequate data for proactive maintenance of the system while allowing sufficient budget and employee capacity to review and analyze all of the CCTV data and incorporate it into any necessary R&R CIP projects.
In 2011, the City committed to an aggressive schedule of manhole inspections to identify potential cross-connections between the sewer system and the storm drain system. Such connections were historically incorporated into the design of certain manholes a s a means of preventing uncontrolled spills in the event of a backup but are no longer considered acceptable. The City inspected all 7,133 manholes by the end of 2013. As part of this process, the City documented the condition of the manholes and identif ied any other issues (e.g., deterioration, excessive I/I).
Manhole inspections are now performed during routine cleaning of pipelines and as needed.
Manhole rehabilitations are part of the City’s CIP program.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
Rehabilitation and Replacement (R&R)
City crews or contractors correct localized problems identified by CCTV and /or sewer cleaning crews. Large scale repairs and replacements are completed in priority order and are coordinated with the City’s street resurfacing program and annual water main replacement projects. Design, bidding, and construction services for sewer rehabilitation and/or replacement projects are provided by the City’s Department of Public Works though the CIP program.
Funding for the CIP is derived from the City’s Sewer Fund which is an enterprise fund. Sewer fees are established based on projected needs and are updated periodically . The budget and project descriptions in the City’s current CIP are listed in Appendix 8B. Additional funding for special projects may be approved by the City Council on a case-by-case basis.
Pump/Lift Station Inspections and Maintenance
City crews inspect the operation of the five lift stations – Arques, Lawrence, Sunken Gardens, Baylands, and Kifer – weekly. Maintenance activities include inspecting the site, verifying pump operation, and vacuuming out grease and debris or applying de-greasers as necessary. Each pump station ha s gravity bypass capability and can be powered by trailer -mounted generators during power outages. In 2015, the City reconstructed each of the five lift stations; this included mechanical upgrades as well as upgrad es to the electrical and SCADA systems to improve operation efficiency.
4.3 Staff and Training
City staff positions dedicated to the maintenance of the collection system facilities are listed in Table 4-2. These positions also receive administrative and clerical support provided by the ESD.
Staffing and resources are constrained under current budgets but are sufficient to maintain services at an acceptable level and, with careful prioritization, to address long-term needs.
Table 4-2: Collection System Staff Maintenance Resources Position FTEs
Wastewater Operations Manager 1
Wastewater Collections Supervisor 1
Wastewater Collections Crew Leader 2
Senior Wastewater Collections Worker 4
Maintenance Worker I, II 7
Total 15
The City uses a combination of in -house classes; on the job training ; California Sanitation Risk Management Authority (CSRMA) site visits and webinars ; and California Water Environment Association (CWEA) conferences, seminars, and other training opportunities to train its Wastewater Collections staff. The City strongly encourages staff to advance their CWEA certification grade, provides financial support for certifications and attending CWEA training, and Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
provides other training and advancement opportunities . Senior staff are actively involved in leadership roles in CWEA and BACWA.
Annual training on the City’s SSMP and SERP is conducted for all wastewater collection employees. The City also maintains an ongoing safety training program that addresses both general and task-specific safety issues. The “Tailgate Schedule for Corp Yard” lists safety training activities for the Water and Sewer Systems Division and is updated annually. The 2024 Tailgate Schedule is included in Appendix 4C.
The City’s contract language requires contractors working in the wastewater collection system to provide training for their employees in the activities that may cause spills and in responding to contractor-caused spills.
4.4 Equipment Inventory
No critical replacement parts are currently warranted. The pump stations have gravity bypasses for emergency situations, and the City has informal agreements with neighboring agencies for equipment support in the event of a sewer maintenance equipment failure.
A list of the major pieces of equipment and vehicles used to support spill responses and maintenance activities is included in Section 5 of the City’s SERP which is included as Appendix
6. Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 5. DESIGN AND PERFORMANCE PROVISIONS
The City’s design and construction standards are used by City Staff and are communicated to consulting engineers and/or developers at the start of a design process or proposed development.
This section references the standards and specifications relevant to the City’s wastewater collection system.
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
5. DESIGN AND PERFORMANCE PROVISIONS
The Plan must include the following items as appropriate and applicable to the Enrollee’s system:
5.1. Updated Design Criteria and Construction Standards and Specifications Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and oth er system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of this Attachment, the procedures must include component -specific evaluation of the design criteria.
5.2. Procedures and Standards
Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.
5.1 Design Criteria and Construction Standards and Specifications Links to the standards, details, and specifications referenced in this section are included in Appendix 5.
The City’s design standards for residential drainage systems are specified in City of Sunnyvale Single-Family Construction Standards, January 2019.
Design requirements for replacement of sewer lines are specified in Residential Water/Sewer Pipes, January 2023.
Requirements for GRDs for Food Service Establishments (FSEs) are specified in Grease Removal Devices, January 2023.
These requirements are consistent with the 2022 California Plumbing Code, which the City has adopted. The City’s Building Division issues permits, conducts plan checks, and conducts inspections for all residential and commercial construction.
Design, installation , and testing requirements for sewer mains and related appurtenances constructed in the public right-of-way are specified in the following documents:
City of Sunnyvale Sanitary Sewer Design Guidelines, September 2023.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
City of Sunnyvale Standard Specifications for Public Works Construction 2006 Edition, Revised June 2019.
City of Sunnyvale Standard Details for Public Works Construction 2006 Edition, Revised May 2022.
Projects in the public right -of-way are coordinated through the D epartment of Public Works ’ Engineering Division . Coordination services include project design, approval of construction plans and specifications, bidding and award of construction contracts, construction management, and inspections.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 6. SPILL EMERGENCY RESPONSE PLAN
This section is designed to ensure that every report of a confirmed spill is immediately dispatched to the appropriate crews. This plan provides a procedure that, when enacted in response to a spill, will reduce or eliminate public health hazards, prevent unnecessary property damage, and minimize the inconvenience of service interruptions. It provides procedures for City staff to follow when responding to, cleaning up, and reporting spills.
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
6. SPILL EMERGENCY RESPONSE PLAN
The Plan must include an up to date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State; • Comply with the notification, monitoring and reporting requirements of this General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities; • Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system; • Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State; • Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters;
• Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre -planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in this General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.
To fulfill the new requirements of the General Order, the City published a Sanitary Sewer SERP in June 2023; it is attached as Appendix 6. Table 1 of the SERP includes a table which lists each of the requirements of the General Order alongside which section of the SERP fulfills that requirement.
The General Order requires that the SERP be reviewed, its effectiveness assessed, and the plan updated, as necessary, annually. The schedule for annual SERP updates and assessments are included in the SSMP implementation and update schedule listed in Table 1-1.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 7. SEWER PIPE BLOCKAGE CONTROL PROGRAM
This section of the SSMP evaluat es the extent and nature of spills related to pipe blockages including FOG, roots, and other debris such as rags, wipes, etc. It outlines the need for and the elements of the City’s Blockage Control Program.
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
7. SEWER PIPE BLOCKAGE CONTROL PROGRAM
The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed.
The procedures must include, at minimum:
• An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances;
• A plan and schedule for the disposal of pipe -blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area; • The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages; • Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements;
• Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance; • An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and
• Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.
7.1 Nature and Extent of Blockage Problem
Since 2015, an average of approximately 93% of spills in the City have been caused by pipe blockages annually. Further, a majority are caused by roots (64%), FOG (22%), or a combination of both in the sewer line.
As of January 2025, the City has over 462 FSEs which are potential commercial and industrial sources of FOG discharging to the wastewater collection system. FSEs include eating and drinking establishments, cafeterias, bakeries, delis, meat preparation, mobile facilities, and one sausage manufacturer. The largest concentration of commercial FOG sources are FSEs located in the vicinity of Murphy Ave and along portions of El Camino Real. Some are located in older buildings and have undersized grease traps.
7.2 Blockage Control Program
Approximately 17% of the collection system’s pipelines are currently on the enhanced frequency cleaning listings (60-day, 90-day, semi-annual, and bi-annual), which are used by the Wastewater Collections Program (WW Collections) to sched ule sewer line preventive maintenance. The enhanced frequency cleaning listings reside on the City network, are accessible by ESD staff, Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
and are periodically updated based on information collected during maintenance activities (particularly the results of CCTV inspections). Such periodic updating allows the City to adjust cleaning frequencies to the needs of the particular line segment and more effectively utilize maintenance resources.
To address root intrusion, the City deploys both chemical and mechanical methods, as needed.
The City also contracts for the treatment of some lines that have a history of issues with roots .
Currently about 35,000 feet are treated annually. Pipelines that have had FOG-related spills or surcharging, particularly those with multiple instances of FOG -related spills or surcharging , are placed on the enhanced frequency cleaning listings.
ESD Blockage Control Program Elements
Sewer Line Cleaning:
1. Pipe blockage information is shared between WW Collections and the Regulatory Programs Division / Compliance Inspection Group.
2. WW Collections will contact the Compliance Inspection Group for enforcement or outreach support when a spill event is in progress or has occurred.
3. WW Collections provides line blockage information to the Compliance Inspection Group for review and any follow-up.
4. WW Collections will advise the Compliance Inspection Group of any possible grease discharge or other blockages identified during mainline stoppage, follow up or general maintenance flushing, or scheduled televising wastewater segments.
5. The Compliance Inspection Group will advise WW Collections of all findings, all outreach program participants, and their findings of any investigation initiated by WW Collections or caused by concerns identified during the follow up or annual maintenance flushing of wastewater main segments.
Legal Authority – Ordinance: The SMC identifies discharge-related prohibitions and requirements. These include GRD requirements and enforcement actions. Reference to the sections of the SMC that are relevant to the Blockage Control Program and Enforcement are included in Table 3-1.
FSE Permits/Registration: The Compliance Inspection Group has identified all FSEs in the City and performs sampling, inspection, and enforcement to verify compliance with SMC and Best Management Practices (BMPs). New or remodeled FSEs are identified through a review of the Business License list in conjunction with the City’s Finance and Building Departments.
FSE Inspections/Enforcement: Currently, one Senior Environmental Compliance Inspector and six Environmental Compliance Inspectors conduct FOG Program inspections . Since 2011, the Compliance Inspection Group has inspected most FSEs on an annual basis . FSEs that are considered low FOG are inspected at least once every three years . Low FOG facilities include businesses that do not cook and use disposal food ware with no dishwashing. Although unrelated to General Order compliance, the Compliance Inspection Group also inspects FSEs for Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
compliance with stormwater BMPs concurrent with FOG inspections. During FSE inspections, the emphasis is on:
1. GRD installation and maintenance;
2. Process information;
3. Grease management; and
4. BMPs.
Enforcement actions are clearly outlined in the City’s Pretreatment Inspection Enforcement Response Plan which was most recently revised in February 2024 and a copy of which is included in Appendix 7. Elements include:
1. Identifying and investigating instances of noncompliance;
2. Enforcement procedures; and
3. Enforcement response guide.
A summary of inspections and enforcement actions over the past ten years is included in the following table.
Table 7-1. FSE Inspection and Enforcement
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Total FSEs 509 444 405 423 419 395 418 446 437 460
FOG inspections
completed1
608 531 559 574 537 536 468 483 483 496
Enforcement actions
taken
66 32 72 59 75 69 35 30 18 30
Spills caused by FOG 0 0 2 1 1 2 1 3 2 2
Notes:
1. Includes both routine and follow-up inspections.
Grease Interceptor and Trap Installation Requirements : All GRDs installed or cause d to be installed are sized in conformance with the currently adopted edition of the Uniform Plumbing Code (SMC 12.12.026). The Compliance Inspection Group coordinates with the Building Division in the permit review of FSEs.
Grease Interceptor and Trap Maintenance Requirements: In accordance with SMC 12.12.026, all GRDs installed or caused to be installed shall be kept in good repair and shall be maintained in continuous operation. The GRD contents shall be removed every six months at a minimum, and documentation of all grease removal activities shall be maintained . The Environmental Compliance Inspectors inspect FSEs for these criteria . Inspectors review cleaning records for GRDs and if records or other observations indicate insufficient cleaning, inspectors may conduct FOG accumulation measurements of the GRD. The City requires compliance with the 25% rule BMP, that is, FSEs are required to maintain their GRDs below 25% total capacity of measured solids and FOG. Any measurement above 25% indicates that the cleaning frequency of the GRD Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
is not adequate and requires an immediate pump out and, potentially, an increased maintenance frequency.
Grease Hauling and Disposal Requirements : It is unlawful for any person to dispose of any grease by discharge into any sanitary sewer or storm drainage system (SMC 12.12.025).
1. Environmental Compliance Inspectors review the contracted grease hauling and disposal company documents when conducting an FSE inspection.
2. FSEs that conduct self-cleaning of GRDs are provided guidance regarding proper disposal of the FOG.
Grease Hauling and Disposal Facilities : The nearest disposal site for FOG is Silicon Valley Clean Water (SVCW) in Redwood City. Other local facilities that accept FOG from outside their service areas include the East Bay Municipal Utility District (EBMUD) in Oakland and the City of Watsonville Wastewater Treatment Facility.
Kitchen BMP Requirements : Kitchen BMP activities are observed and related questions are asked during inspections of FSEs. All FSEs receive BMP documents regarding FOG reduction, and the BMPs are published in multiple languages.
Residential Program : The Compliance Inspection Group previously conducted surveys and inspections of residential complexes located in FOG “hot spots,” as identified by WW Collections.
These facilities receive information on BMPs, and their effectiveness will be monitored.
Education and Outreach: The Environmental Programs Specialist works with the Compliance Inspection Group in selecting and distributing both FSE and residential complex BMPs related to FOG reduction. In addition, FOG outreach regularly occurs as articles in City newsletters, social media, newspapers, and utility bill inserts.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 8. SYSTEM EVALUATION, CAPACITY ASSURANCE, AND CAPITAL
IMPROVEMENTS
This section outlines the City’s programs and activities to ensure adequate capacity of all facilities by evaluating the condition of the system as well as the hydraulic capacity.
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
8. SYSTEM EVALUATION, CAPACITY ASSURANCE AND CAPITAL IMPROVEMENTS The Plan must include procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
• A capital improvement plan.
8.1 System Evaluation and Condition Assessment
The Plan must include procedures to:
• Evaluate the sanitary sewer system assets utilizing the best practices and technologies available; • Identify and justify the amount (percentage) of its system for its condition to be assessed each year; • Prioritize the condition assessment of system areas that:
o Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies;
o Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas;
o Are within the vicinity of a receiving water with a bacterial -related impairment on the most current Clean Water Act section 303(d) List;
• Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods;
• Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State; • Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
• Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to:
sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.
8.2 Capacity Assessment and Design Criteria
The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:
• Dry-weather peak flow conditions that cause or contributes to spill events; • The appropriate design storm(s) or wet weather events that causes or contributes to spill events; • The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.
The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information;
• Capacity of flood -prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions;
• Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change;
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
• Increases of erosive forces in canyons and streams near underground and above- ground system components due to larger and/or higher-intensity storm events;
• Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and
• Necessary redundancy in pumping and storage capacities.
8.3 Prioritization of Corrective Action
The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions.
Prioritization must consider the severity of the consequences of potential spills.
8.4 Capital Improvement Plan
The capital improvement plan must include the following items:
• Project schedules including completion dates for all portions of the capital improvement program; • Internal and external project funding sources for each project; and • Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.
8.1 System Evaluation and Condition Assessment
The City’s system evaluation and condition assessment process is detailed in Element 4 as part of the preventive O&M program. This includes pipeline CCTV inspections on a ten -year cycle, manhole inspections, pump/lift station inspections and maintenance, and R&R projects developed as a result of these inspections.
8.2 Capacity Assessment and Design Criteria
To fulfill the requirements of Element 8 of the SSMP, the City conducted a Wastewater Collection System Model Expansion and Capacity Analysis (Capacity Analysis) – included as Appendix 8A – which was finalized in December 2022 as an update to the analysis completed in the 2015 WWMP. The objectives of the 2022 Capacity Analysis were:
• To develop wastewater flow projections for the City’s sewer service area using up -to-date development and land use information and flow monitoring data; • Develop an updated hydraulic model of the trunk sewer system; • Use the model to identify existing capacity deficiencies and future capacity requirements; and • Develop a capacity improvement plan, including project priorities and planning level estimates of construction and capital costs.
8.3 Prioritization of Corrective Action and Capital Improvement Plan The CCTV footage and inspection data is used to develop R&R projects based on pipe condition.
Pipes with severe defects (rated 4 or 5 on the NASSCO PACP rating scale) are prioritized for rehabilitation. Pipes with multiple severe defects are further anal yzed; if there are too many defects and a full manhole-to-manhole replacement is deemed necessary, the pipe is added to a CIP list which goes out for bid every three years.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
As part of the 2022 Capacity Analysis, a set of CIP projects was developed based on hydraulic deficiencies identified in the model in both existing and future development scenarios. Details on the prioritization of projects can be found in Section 5.2 of the Capacity Analysis included as Appendix 8A.
Since the completion of the Capacity Analysis, the City has developed a 20 -year CIP budget projection for sewer capacity enhancement projects. Specific projects were identified, prioritized, and scheduled within the limitations of the budget. The 20-year CIP is reviewed and adjusted on a two-year cycle.
As they are funded by separate accounts, R&R projects based on pipe condition are analyzed and implemented separately from capacity-related hydraulic deficiencies. The current schedule for the City’s R&R and capacity enhancement projects is included in the City’s annual budget which is approved by City Council. Annual funding is also programmed in the budget to address emergency repairs on an as-needed basis. A listing of the annual budgets and project description for Wastewater System CIP projects from the City’s FY 2024/25 approved Budget and Resource Allocation Plan is included as Appendix 8B.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 9. MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS This section of the SSMP outlines the process that the City will follow to evaluate the effectiveness of the SSMP and to identify updates that may be needed for a more effective program.
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
9. MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS
The Plan must include an Adaptive Management section that addresses Plan- implementation effectiveness and the steps for necessary Plan improvement, including:
• Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities; • Monitoring the implementation and measuring the effectiveness of each Plan Element; • Assessing the success of the preventive operation and maintenance activities; • Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
• Identifying and illustrating spill trends, including spill frequency, locations and estimated volumes.
9.1 Performance Measures
The statistics that the City will use to measure the performance of its wastewater collection system and the effectiveness of its SSMP are:
• Total number of spills;
• Volume of sewage spilled, recovered, and reaching water of the State; • Locations with multiple spills;
• Number of spills broken down by cause (roots, debris, FOG, pipe structural issues, etc.); and • Annual pipeline cleaning and inspection lengths (see Element 4).
Table 9-1 summarizes the annual statistics for spills over the past ten years. For this period, the City averaged 5.8 spills annually with a high of 1 1 in 2022, and a low of three in both 2015 and 2016. Though there is fluctuation from year to year, in general, the number of spills has remained relatively low and consistent in both recent years and in the longer-term average. 2021 saw only four spills which is lower than both the recent and longer-term average. The high number of spills in 2022 may be attributed to changes in wastewater discharge patterns and staffing shortages due to COVID-19, preventing the full menu of preventive O&M activities from being implemented.
As of 2024, the City has returned to full staff and has resumed all preventive O&M activities.
In addition to these performance measures, the City internally considers additional measurements such as emergency response times to ensure the best response to a spill.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
Table 9-1: Annual Spill Statistics
Parameter 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Number of dry weather spills 3 3 6 5 7 6 4 11 7 6
Number of wet weather spills (capacity-
related)
0 0 0 0 0 0 0 0 0 0
Total number of spills 3 3 6 5 7 6 4 11 7 6
Number of spills per 100 miles of sewer 1 1 1.9 1.6 2.3 1.9 1.3 3.5 2.3 1.9 Number of spills < 100 gallons 1 2 2 2 2 1 2 6 3 3
Number of spills 100 to 999 gallons 2 1 1 1 2 2 1 2 4 3 Number of spills 1,000 to 9,999 gallons 0 0 3 2 3 3 1 3 0 0 Number of spills > 10,000 gallons 0 0 0 0 0 0 0 0 0 0
Total volume of spills (gallons) 1,795 765 5,390 3,600 6,530 4,829 4,470 6,450 1,851 1,735 Total volume recovered and returned to
collection system (gallons)
1,795 765 5,390 3,600 6,530 4,829 4,470 6,450 1,851 1,735 Net volume of spills (total - recovered,
gallons)
0 0 0 0 0 0 0 0 0 0
Percent volume recovered (100 x Total
volume recovered / Total volume of spills)
100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Number of locations with more than one
spill
1 0 0 0 0 1 0 1 0 0
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
Figure 9-1 provides a visual representation of spills by volumes: total, recovered, and unrecovered. During the five -year period from 2009 to 2013, the total spill volume averaged 12,624 gallons/year and the percentage of spill volume recovered averaged 88%. Since 201 5, the total spill volume has decreased substantially to 3, 742 gallons/year and the percentage of volume recovered has increased to 100%. The reduction in volume and the increase in overall recovery can be attributed to the programs that the City has implemented as part of the SSMP and speaks to the effectiveness of staff training in spill response and recovery and SSMP programs in general. These changes indicate the success of the City’s SSMP in minimizing the number and volume of spills and implementing proper procedures to respond to and contain spills when they do happen.
It is noted that though the number and volume of spills continues to fluctuate from year to year, no spills have been discharged to surface waters since 2012, and no volume has been unrecovered since 2013.
Figure 9-1: Spills by Volume
The cause of all spills over the past ten years is summarized in Table 9-2 and Figure 9-2. Roots are the most common cause of spills for all years. The City implements regular maintenance of the collection system and deploys both chemical and mechanical methods for addressing root intrusion, as needed.
0 1,000
2,000
3,000
4,000
5,000
6,000
7,000
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Volume (gallons)
Total Volume of Spills Volume Recovered Volume Unrecovered Volume to Waters Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
Table 9-2: Spills by Cause
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Percent of Total
Roots 3 2 4 4 5 4 3 5 3 3 64%
Debris 0 1 0 0 0 0 0 2 0 1 8%
FOG 0 0 2 1 1 2 1 3 2 2 24%
Pipe Structural
Issue
0 0 0 0 1 0 0 1 1 0 4%
Other 0 0 0 0 0 0 0 0 1 0 0
Total Spills 3 3 6 5 7 6 4 11 7 6 100%
Figure 9-2: Spills by Cause
9.2 Performance Monitoring and Program Changes
The performance measures listed above are used to evaluate the overall performance of the City’s wastewater collection system and the effectiveness of its SSMP; these statistics are tracked and evaluated regularly.
The City also evaluate s the effectiveness of each individual SSMP element using a set of key performance indicators developed as part of the SSMP audit in order to ensure all information in the SSMP is current, all regulatory requirements are satisfied, and programs are effective in 0 2
4 6
8 10
12 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Spills (count)
Roots Debris FOG Pipe Structural Issue Other
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
meeting the City ’s goals for the collection system stated in Section 1.2. The primary tool for documenting this evaluation is the SSMP audits completed every three years (see Element 10).
Where deficiencies are identified, corrective actions are developed to address the deficiencies and improve the SSMP programs where necessary. All changes/updates to the SSMP are recorded in the SSMP change log. The most recent change log is included as Appendix 10A.
Examples of changes that could result from ongoing evaluation include:
• Revisions to frequency of cleaning cycles and/or FSE inspections based on field observations and CCTV inspections;
• Reprioritization of R&R projects based on the results of CCTV inspection, manhole inspections, and/or capacity analyses;
• Implementation of new methods and procedures based on experience developed in -house and from other agencies; and/or
• Increased use of information technology (GIS, GPS, and CMMS) for administrative and field operations.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 10. INTERNAL AUDITS
This section outlines the City’s SSMP auditing program.
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
10. INTERNAL AUDITS
The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of this General Order.
General Order, Section 5.4 – Sanitary Sewer Management Plan Audits The Enrollee shall conduct an internal audit of its Sewer System Management Plan, and implementation of its Plan, at a minimum frequency of once every three years. The audit must be conducted for the period after the end of the Enrollee’s last required audit period. Within six months after the end of the required 3-year audit period, the Legally Responsible Official shall submit an audit report into the online CIWQS Sanitary Sewer System Database per the requirements in section 3.10 (Sewer System Management Plan Audit Reporting Requirements) of Attachment E1 of this General Order.
Audit reports submitted to the CIWQS Sanitary Sewer System Database will be viewable only to Water Boards staff.
The internal audit shall be appropriately scaled to the size of the system(s) and the number of spills. The Enrollee’s sewer system operators must be involved in completing the audit. At minimum, the audit must:
• Evaluate the implementation and effectiveness of the Enrollee’s Sewer System Management Plan in preventing spills.
• Evaluate the Enrollee’s compliance with this General Order. • Identify Sewer System Management Plan deficiencies in addressing ongoing spills and discharges to waters of the State; and
• Identify necessary modifications to the Sewer System Management Plan to correct deficiencies. • The Enrollee shall submit a complete audit report that includes:
• Audit findings and recommended corrective actions.
• A statement that sewer system operators’ input on the audit findings has been considered; and • A proposed schedule for the Enrollee to address the identified deficiencies.
10.1 Audits
The City conducted annual audits of the SSMP from calendar years 2008 through 2011; beginning in 2012, the audits were conducted biennially. The latest audit was submitted October 2024, and in compliance with the new requirements of the General Order, SSMP audits will continue every three years moving forward. The schedule for completing SSMP audits is included in the SSMP implementation and update schedule listed in Table 1-1.
SSMP audits are due November of the year following the monitoring period; the monitoring period is the previous three calendar years. Thus, the next audit will evaluate the monitoring period of January 1, 2024 through December 31, 2026 and will be submitted by November 2, 2027. Audits have historically been conducted by the City’s Wastewater Operations Manager and/or an outside consultant with the support of the City’s Wastewater Collections Supervisor; other parties may be added to future audit teams.
An audit checklist, adapted from a document developed by BACWA and based on the requirements of the General Order is used to evaluate each element of the SSMP. The checklist focuses on evaluating the compliance, implementation, and effectiveness of each element with a Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
set of questions, each answered with a “Yes/No” response and supported by notes to explain any deficiencies and/or provide supporting context or detail. In addition to the checklist, spill data is provided that provides key performance indicators , accompanied by a discussion to measure/evaluate the overall effectiveness of the SSMP during the monitoring period. Finally, a summary of any deficiencies identified is provided , each with a corresponding corrective action and scheduled completion date.
Per the new requirements of the General Order, the audit is submitted to the online CIWQS Sanitary Sewer System Database. Internally, t he Wastewater Operations Manager retains the audit for City records. The audit serves as the primary tool for documenting SSMP effectiveness as described in Element 9.
10.2 SSMP Updates
As part of the audit process, City staff will update critical information in the SSMP per any deficiencies identified in the audit. In general, information expected to require regular routine updating (contact lists, performance statistics, Enhanced Frequency Cleaning lists, etc.) is included in the SSMP as appendices or referenced to external documents to facilitate the update process and reduce the frequency that the body of the SSMP will require updating. All updates to the SSMP will be tracked in a Ch ange Log. Consistent with the audit, t he Wastewater Operations Manager is responsible for maintenance and updating of the SSMP and the Change Log.
The SSMP will be comprehensively updated every six years moving forward per the new requirements of the General Order, i.e., the next major update will be in 2031. This submittal is included in the SSMP Implementation and Update Schedule provided in Table 1-1. Changes made to the SSMP as part of this update are documented in the Change Log located in Appendix 10A.
10.3 Annual Reports
General Order, Attachment E1 – Notification, Monitoring, and Reporting and Recordkeeping Requirements,
3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ) All enrollees shall update their previous year’s Annual Report, by April 1 of each year after the Effective Date of this General Order, for each calendar year (January 1 through December 31).
The Annual Report must be entered directly into the online CIWQS Sanitary Sewer System Database. The Enrollee’s Legally Responsible Official shall certify the Annual Report as instructed in CIWQS; The Annual Report must address, and update as applicable, the following items:
• Population served;
• Updated sewer system service area boundary map, if service area boundary has changed from original map submitted per section 5.14 (Electronic Sanitary Sewer System Service Area Boundary Map) of this General Order;
• Number of system operation and maintenance staff:
o Entry level (less than two years of experience),
o Journey level (greater than two years of experience), o Supervisory level, and
o Managerial level;
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
• Number of operation and maintenance staff certified as a certified collection system operator by the California Water Environmental Association (CWEA), with:
o Corresponding number of certified collection system operator grade levels (Grade I, II, III, IV, and V); • System information:
o Miles of system gravity and force mains,
o Number of upper and lower service laterals connected to system, o Estimated number of upper and lower laterals owned and/or operated by the Enrollee, o Portion of laterals that is Enrollee’s responsibility, o Average age the major components of system infrastructure, o Number and age of pump stations, and
o Estimated total miles of the system pipeline not accessible for maintenance; • Name and location of the treatment plant(s) receiving sanitary sewer system’s waste; • Name of satellite sewer system tributaries;
• Number of system’s gravity sewer above or underground crossings of water bodies throughout system; • Number of force main (pressurized pipe) above or underground crossings of water bodies throughout system; • Number of siphons used to convey waste throughout the sewer system; • Miles of sewer system cleaned;
• Miles of sewer system video inspected, or comparable (i.e., video closed -circuit television or alternative inspection methods);
• System Performance Evaluation as specified in section 5.11 (System Performance Analysis) of this General Order;
• Major spill causes (for example, root intrusion, grease deposition); • System infrastructure failure points (for example, main, pump station, lateral, etc.); • Ongoing spill investigations; and
• Actions taken to address system deficiencies.
Per the requirements of Section 3.9 of the General Order, the City will also submit an Annual Report by April 1 of each calendar year for the monitoring period of the previous calendar year.
This submittal is included in the SSMP Implementation and Update Schedule provided in Table 1-1.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
THIS PAGE INTENTIONALLY LEFT BLANK
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
ELEMENT 11. COMMUNICATION PROGRAM
This section of the SSMP outlines the process involved in communicating with interested members of the public regarding the development, implementation, and performance of this plan.
General Order, Attachment D – Sanitary Sewer Management Plan Required Elements
11. COMMUNICATION PROGRAM
The Plan must include procedures for the Enrollee to communicate with:
• The public for:
o Spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and o The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
o System operation, maintenance, and capital improvement-related activities.
11.1 Communication with the Public
SSMP Development and Updates
The City Council approved the schedule for completion of the first SSMP at its August 27, 2007 Council meeting. In advance, Public Works staff prepared a Report to Council that provided background information including regulatory drivers for SSMP development, SSMP purpose and content, relationship to existing City policy as described in the Wastewater Management Sub - element of the City’s General Plan, and the SSMP implementation schedule. The Council report was available to the public through the following channels:
• Posted on the City’s official notice bulletin board;
• Posted on the City Council web page;
• Through the City Library and the City Clerk’s Office; and • The Council meeting was open to the public and included a period for public comment.
In May 2009, the City amended the sewer use ordinance to implement additional FOG Program elements as required by the SSMP. The proposed ordinance revisions were also publicly noticed and made available to the public through the same channels listed above.
At the September 11, 2012 Council meeting, City Council approved a revised version of the SSMP; a Report to Council was prepared to advise of the changes to the previous SSMP. The Council report was available to the public through the same channels listed above.
In 2015, an update to the SSMP was conducted in order to comply with the Revised Monitoring and Reporting Program (Order No. WQ 2013 -0058-EXEC). City Council approved a revised version of the SSMP at the May 12, 2015 Council meeting. As in 2012, a Report to Council was prepared to advise of the changes including content and format updates which was available to the public through the same channels listed above.
Attachment 2
City of Sunnyvale
Sewer System Management Plan
April 2025
www.hydroscience.com
In 2020, another update to the SSMP was conducted per the requirements of the WDRs (Order No. 2006-0003). City Council approved the 2020 SSMP at the May 19, 2020 Council meeting.
As done previously, a Report to Council was made available through the same channels as listed above.
Ongoing Communication
Posting of SSMP on City Web Site : The City will post the proposed 2025 SSMP on the City’s website during the Council approval process as well as the final SSMP once approved and adopted by Council. The link to the document will be on the ESD, Water and Sewer Services page provided below; this page also includes contact information for reporting spills. https://www.sunnyvale.ca.gov/homes-streets-and-property/water-and-sewer/sewer Spill Reporting: The Wastewater Operations Manager is the primary person responsible for reporting spills to Cal OES . Information on individual spills is available to the public through a GIS-based application on the SWRCB web site at:
https://www.waterboards.ca.gov/water_issues/programs/sso/sso_map/sso_pub.shtml Blockage Control Program: The City operates a Blockage Control Program that regulates the discharge of debris, specifically FOG from commercial FSEs by requiring the installation and maintenance of GRDs and through distribution of BMP information (see Element 7 ). FSE inspections and enforcement are administered through the Pretreatment Program. Control of FOG and debris discharge from residential sources is achieved primarily through education and outreach efforts that communicate a consistent and ongoing message regarding the impacts of FOG and other debris on the collection system, provides information for proper disposal, distributes FOG scrapers, etc. The FOG outreach activities are conducted at community events such as the Health and Safety Fairs, during school presentations, and other venues. The Program also uses the City’s newsletter s, utility bill inserts, electronic billboards , print newspapers, and social media to communicate a variety of pollution prevention messages, including FOG -related messages.
General Outreach: As previously stated, the City communicates a variety of pollution prevention messages to the public through newsletters, utility bill inserts, electronic billboards , and social media. In addition, the City also participates in regional outreach activities through the BACWA/Association of Bay Area Governments (ABAG)/ Bay Area Municipal Stormwater Collaborative (BAMSC) Regional Media Relations Campaign.
11.2 Communication with Connected Systems
The City’s wastewater collection system does not contain any tributary or satellite systems that require communication or coordination.
Attachment 2
www.hydroscience.com
APPENDIX 2
City of Sunnyvale
Sewer System Management Plan
City Staff Responsibility for SSMP Implementation
Attachment 2
www.hydroscience.com
City Staff Responsibility for SSMP Elements
SSMP Element Responsible Official Name Phone Number Email Address
1. Goal and Introduction Wastewater Operations Manager Winola Cheong 408-730-7763 [email protected]
2. Organization ESD Director Ramana Chinnakotla 408-730-7785 [email protected]
3. Legal Authority ESD Director Ramana Chinnakotla 408-730-7785 [email protected]
4. Operation and Maintenance Program Wastewater Operations Manager Winola Cheong 408-730-7763 [email protected]
5. Design and Performance Provisions Water and Sewer Systems Division Manager
Mansour Nasser 408-730-7578 [email protected]
6. Spill Emergency Response Plan Wastewater Operations Manager Winola Cheong 408-730-7763 [email protected]
7. Sewer Pipe Blockage Control Program Regulatory Programs Division Manager Winola Cheongr 408-730-7763 [email protected]
8. System Evaluation, Capacity
Assurance, and Capital Improvements
Water and Sewer Systems Division
Manager
Mansour Nasser 408-730-7578 [email protected]
9. Monitoring, Measurement, and
Program Modifications
Wastewater Operations Manager Winola Cheong 408-730-7763 [email protected]
10. Internal Audits Wastewater Operations Manager Winola Cheong 408-730-7763 [email protected]
11. Communication Program ESD Director Ramana Chinnakotla 408-730-7785 [email protected]
Attachment 2
www.hydroscience.com
APPENDIX 3
City of Sunnyvale
Sewer System Management Plan
Legal Authority
Attachment 2
www.hydroscience.com
Sunnyvale Municipal Code (SMC) and Other Sources
SMC Section 12.08.010 https://ecode360.com/42717567#42717567 SMC Section 12.12.020 https://ecode360.com/42717575#42717575 SMC Section 12.12.025 https://ecode360.com/42717575#42717592 SMC Section 12.12.026 https://ecode360.com/42717593#42717593 SMC Section 12.12.260 https://ecode360.com/42717575#42717764 SMC Section 12.18.090 https://ecode360.com/42717883#42717883 SMC Chapter 16.24 https://ecode360.com/42720869#42720869 SMC Section 18.08.040 (f) https://ecode360.com/42728741#42728736 SMC Section 18.12.080(a) https://ecode360.com/42728804#42728781 SMC Section 18.12.150 https://ecode360.com/42728804#42728804 City Council Policy No.
3.3D.6
https://www.sunnyvale.ca.gov/home/showpublisheddocument/688/63788 7475110100000
City Std. Specs. https://www.sunnyvale.ca.gov/business-and-development/planning-and- building/permit-center/design-guidelines-and-standards
Attachment 2
www.hydroscience.com
APPENDIX 4A
City of Sunnyvale
Sewer System Management Plan
SOP for Sewer Cleaning
Attachment 2
(2) Hydro-Jet Cleaning Sanitary Sewer (Main)
1. Background:
The City of Sunnyvale will hydro-flush clean city mains on the city owned sewer.
2. Scope:
This document presents the materials, the procedures to follow, and the safety items to hydro-flush clean sewer mains for the City of Sunnyvale.
3. Materials:
3.1 Hydro-flush Truck
3.2 Manhole hook
3.3 GIS or map data
3.4 Atmosphere Tester (4 Gas Analyzer)
3.5 Debris spoon (clam) and/or forks
4. Procedure:
4.1 Ensure that all personnel are using prescribed personal safety/protective equipment (i.e.; ear protections, safety glasses, safety vest, appropriate foot wear, etc.) prior to beginning any work.
4.2 Ensure that all safety signage and warning devices and traffic control are in place prior to beginning any work.
4.3 Check GIS and/or Sewer Maps for ID numbers, location, and orientation of sewer assets.
4.4 Use atmosphere tester to assure safe gas levels in manhole prior to opening lid.
4.5 Pull manhole lids upstream and downstream.
4.6 Insert jetter hose into tiger tail and into the run of the main.
4.7 Turn on water to jetter and turn up trucks rpm to get proper PSI.
4.8 Run out hose up the main until it gets to next manhole.
4.9 Pull hose back slowly to remove debris.
4.10 Vacuum out all heavy debris out of the base of manhole or use “clam” bucket to remove debris.
4.11 Set lids back on manholes.
4.12 Fill out all associated paperwork making note of work performed and findings.
Attachment 2
www.hydroscience.com
APPENDIX 4B
City of Sunnyvale
Sewer System Management Plan
SOP for CCTV Inspections
Attachment 2
(14) CCTV Inspection Video Sanitary or Storm Sewer Inspection (Main)
1. Background:
The City of Sunnyvale will Video sewer mains on the city owned sewer.
2. Scope:
This document presents the materials, the procedures to follow, and the safety items to video sewer mains.
3. Materials:
3.1 Video truck
3.2 Cable rollers
3.3 Manhole hook
3.4 Atmosphere Tester (4 Gas Analyzer)
4. Procedure:
4.1 Ensure that all personnel are using prescribed personal safety/protective equipment (i.e.; ear protections, safety glasses, safety vest, appropriate foot wear, etc.) prior to beginning any work.
4.2 Ensure that all safety signage and warning devices and traffic control are in place prior to beginning any work.
4.3 Check GIS and/or Sewer Maps for ID numbers, location, and orientation of sewer assets.
4.4 Use atmosphere tester to assure safe gas levels in manhole prior to opening lid.
4.5 Clean main or root cut main prior to video operations if necessary.
4.6 Insert camera into main set and up manhole data in computer.
4.7 Televise from manhole to manhole noting all defects and laterals.
4.8 Replace manhole lids.
4.9 Fill out all associated paperwork making note of work performed and findings.
Attachment 2
www.hydroscience.com
APPENDIX 4C
City of Sunnyvale
Sewer System Management Plan
2024 Tailgate Schedule for Corp Yard
Attachment 2
Tailgate Date Content
01/10/24 Dial 811 Before You Dig/What's Locating?
01/24/24 Wet Weather Tool Box
02/21/24 AWWA Training Library: Powersaw Safety
03/06/24 Spartan Pro Cast Episode 7: Cabling for Roots 101 03/20/24 MSA Altair 5x Multi-Gas Detector, Hands-on Gas Detector Training
04/03/24 Video - MSA GAS Tech / Ladder Safety
04/17/24 Safety- PPE
04/17/24 Video - AWWA PPE
04/30/24 MSA Gas Tech
05/01/24 Protecting our Waterways- Emma Hinojosa
05/15/24 Video - National Safety Compliance
05/29/24 Timecards (Comp Time) Overview
06/12/24 Video - Compacting Tools
06/26/24 Video - Heat Illness Prevention
07/24/24 Video - Solid Waste / Eye Protection
07/24/24 Recycle Training
08/07/24 Video - Slips trips and falls
08/21/24 AEM Vacuum Excavator Safety Training Video
09/04/24 Video of Wet Weather Safety
12/11/24 Video of rodder tips
Attachment 2
www.hydroscience.com
APPENDIX 5
City of Sunnyvale
Sewer System Management Plan
City Standards, Details, and Specifications
Attachment 2
www.hydroscience.com
City of Sunnyvale Single-Family Construction Standards, January 2019:
https://www.sunnyvale.ca.gov/home/showpublisheddocument/1724/637820860109470000 Residential Water/Sewer Pipes, January 2023:
https://www.sunnyvale.ca.gov/home/showpublisheddocument/1758/638440411792370000 Grease Removal Devices, January 2023:
https://www.sunnyvale.ca.gov/home/showpublisheddocument/1490/638121413977400000 City of Sunnyvale Sanitary Sewer Design Guidelines, September 2023:
https://www.sunnyvale.ca.gov/home/showpublisheddocument/1602/638301045915400000 City of Sunnyvale Standard Specifications for Public Works Construction 2006 Edition, Revised June 2019:
https://www.sunnyvale.ca.gov/home/showpublisheddocument/1606/637820851912670000 City of Sunnyvale Standard Details for Public Works Construction 2006 Edition, Revised May 2022:
https://www.sunnyvale.ca.gov/home/showpublisheddocument/1604/638084485284930000
Attachment 2
www.hydroscience.com
APPENDIX 6
City of Sunnyvale
Sewer System Management Plan
City of Sunnyvale Sanitary Sewer Spill Emergency Response Plan
Attachment 2
City of Sunnyvale
Sanitary Sewer Spill Emergency Response Plan
Date: June 4, 2023
Table of Contents
1. Introduction .................................................................................................................................................... 1
2. Sanitary Sewer Spill Notification Procedures ............................................................................................. 2
2.1. Informing Potential Spill Incidents to Responders and Local Officials .................................................. 2
2.2. Notifications of Spill Incidents to Regulatory Agencies and Potentially Affected Entities ..................... 2
3. Sanitary Sewer Spill Emergency Response Procedure ............................................................................. 4
3.1. Safety ................................................................................................................................................... 4
3.2. Control the Cause of the Wastewater Spill........................................................................................... 4
3.3. Main Line Stoppage and Overflow ....................................................................................................... 5
3.4. Lateral Stoppage .................................................................................................................................. 5
3.5. Clean-up and Mitigation ....................................................................................................................... 5
3.6. Sampling and Lab Tests ...................................................................................................................... 6
3.7. Traffic Control during and after Clean-Up (Sign Posting and Barricading) ........................................... 6
3.8. Recordkeeping and Follow-Up Work.................................................................................................... 7
4. Sanitary Sewer Spill Regulatory Notifications, Monitoring, Reporting, and Record Keeping ................ 7
5. Sanitary Sewer Spill Response Equipment and Vehicles ........................................................................ 11
6. Sanitary Sewer Spill Response Training ................................................................................................... 12
7. Spill Emergency Response Plan (SERP) Reviews and Upda tes ............................................................. 12 Appendices
Appendix A: Sanitary Sewer System Map
Appendix B: Statewide Sanitary Sewer Systems General Order 2022-0103-DWQ Appendix C: Org Chart and Contact Information for responders, data submitters, and Legally Responsible Officials Appendix D: List of On-Call Plumbing Contractors and Emergency Response Contractors Appendix E: Abbreviated Standard Operation Procedure (SOP) for Sanitary Sewer Spill Response Appendix F: Spill Response Report Template
Appendix G: Surcharge Response Report Template
Appendix H: Post-Spill Response Assessment Form
Appendix I: Category 4 Spill Recordkeeping Template
Attachment 2
1. Introduction
The City of Sunnyvale (City) owns and operates the sanitary sewer system within the City boundary as well as a small area in the City of Cupertino. The system consists of about 310 miles of gravity pipes, 2 miles of pressured pipes (i.e., siphons and force mains), over 7,000 manholes, and five pump stations; a map of the system is included as Appendix A of this document . The system is operated and maintained by th e Environmental Services Department ’s (ESD’s) Water and Sewer Division (Division) ; whereas the sewer service laterals are owned by, and therefore the responsibilities of, individual property owners.
Pursuant to the Statewide Sanitary Sewer Systems General Order 2022-0103-DWQ, attached herein as Appendix B, public entities that own and/or operate one or more sanitary sewer systems, such as the City, are required to update and implement a Spill Emergency Response Plan (SERP) within six months of the adoption date of the General Order, which is June 5, 2023. Ta ble 1 provides a summary of the SERP requirements outlined in Attachment D -6 of the General Order. The City is required to keep the SERP on file internally but is not required to submit it to the State. The City is, however, required to certify that the SE RP is up to date in its Annual Report (the next one is due on April 1, 2024), and include it in its Sanitary Sewer Management Plan (the next SSMP is due in June 2026).
Table 1: Required Procedures per Attachment D-6 of General Order 2022-0103-DWQ No. Procedure Section(s)
1 Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner; 2, 4
2 Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State; 2, 4 3 Comply with the notification, monitoring and reporting requirements of [the reissued] General Order, State law and regulations, and applicable Regional Water Board Orders; 4 4 Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained; 6
5 Address emergency system operations, traffic control and other necessary response activities; 3
6 Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system; 3
7 Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State; 3
8 Remove sewage from the drainage conveyance system; 3
9 Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters; 3 10 Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery; 3, 5
11 Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; 2 12 Conduct post-spill assessments of spill response activities; 3 13 Document and report spill events as required in [the reissued] General Order; 4 14 Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed. 7
Attachment 2
2. Sanitary Sewer Spill Notification Procedures
The City is committed to meeting the spill notification requirements outlined in Attachments E1 and E2 of the General Order. To achieve this goal, the City has implemented several measures, including providing multiple platforms for the general public to report potential sewer spills or surcharges, training a crew of qualified staff (aka responders) to respond to spill incidents, and possessing a fleet of vehicles and large equipment to contain and cleanup spills. The City has also appointed three data submitters and two Legally Responsible Officials (LROs) to ensure spill incidents are promptly reported to the appropriate personnel and agencies. Furthermore, the City also maintains one responder on after-hour standby shifts to make sure spill incidents can be addressed promptly even after hours and retains a list of qualified contractors that could assist with emergency response s and repairs on an as needed basis. The City’s responders, data submitters, and LROs responsible for the implementation of the spill notification procedures are identified in Appendix C along with their contact information. A list of qualified contractors is included in Appendix D.
2.1. Informing Potential Spill Incidents to Responders and Local Officials The City can be notified of potential sewer spill s through multiple venues. S pills can be reported by residents or businesses via the City’s Customer Relationship Management (CRM) system, which has a utility services hotline (408- 730-7400) as well as an online portal (https://sunnyvale.dynamics365portals.us/utility/). Sewer staff are also trained to identify spills and surcharges during their daily assignments . The City also has a Supervisory Control and Data Acquisition (SCADA) system that sends alarms to staff if an issue is detected at one of the pump stations.
Once notified, responders are required to report to the site and assess the situation. If a spill is confirmed, staff must report the spill to the Wastewater Collections Supervisor (supervisor), secure the spill area, follow protocol to control or halt the cause of the spill, and clean the spill as soon as possible. Detailed procedures on how to control and clean the spill are included in Section 3 of this document.
If industrial toxic substances are involved, any volume must be immediately reported to the Department of Public Safety (DPS) Hazardous Materials Response Team.
The supervisor will notify the LROs of the incident, who will be responsible for notifying applicable City staff about the incident. This includes, but are not limited to, the ESD director, the Water Pollution Control Plant if the spill would impact the plant, the DPS Communications Team if public notices and media correspondences are needed, and ESD’s Compliance Inspection group if the spill is determined to be caused by fats, oils, and/or grease (FOG).
2.2. Notifications of Spill Incidents to Regulatory Agencies and Potentially Affected Entities Specific notification and reporting procedures depend on the severity and location of a spill. Detailed procedures are included in Section 4 of this document. In general, the LROs are responsible for reporting all spills using the California Integrated Water Quality System ( CIWQS) online platform. Spills greater than or equal to 1,000 gallons that either discharge or threaten to discharge to surface water must also be reported by phone to the California Office of Emergency Services (Cal OES) within two hours of initial knowledge of such incident.
In addition to regulatory agencies, the LROs are also responsible for notifying the following potentially affected entities:
• If spills resulted in a discharge of sewer of any volume to any of the waterways, the LROs will notify the Santa Clara Valley Water District via their Pollution Hotline at 1-888-510-5151. • Sunnyvale shares borders with the City of Mountain View on the west, the City of Santa Clara on the east, and the City of Cupertino on the south . The crew supervisor maintains a contact list of collection system supervisors of these cities. If a spill is determined to have impacted or have the potential of impacting any of the cities, the supervisor and the LROs will contact these entities to coordinate response efforts.
The City owns and operates the storm drain system within the City boundaries . The storm system is maintained and managed by the same crew , which means the crew has immediate access to the drainage conveyance system and can contain and recover spills immediately without having to coordinate with any external agencies. A flow chart illustrating the chain of communications throughout a spill response procedure is included in Figure 1.
Attachment 2
Figure 1 – Sanitary Sewer Spill Notification Procedure
1. Customer Relationship Management (CRM) Portal: Utility Services Hotline 408-790-7400; or online at https://sunnyvale.dynamics365portals.us/utility/
2. Sewer on-call and standby staff: 408-859-3559
3. See Appendix C for contact information.
4. If the spill may contain hazardous materials, call 911 immediately and DPS via central hotline (408-790-7400).
5. Regulatory agencies are notified through CIWQS per procedures detailed in Section 4. For a Category 1 spill, LROs must also call the CA Office of Emergency Services at 1-800-852-7550 within 48 hours of the incident.
6. ESD Water Pollution Control Plant: 408-730-7260
7. ESD Regulatory Compliance Group: 408-730-7260
8. The following agencies will be notified depending on the location and impact of a confirmed spill:
• Santa Clara Valley Water District Pollution Hotline: 1-888-510-5151 • City of Mountain View Sewer and Storm System Supervisor: 408-903-6270 • City of Santa Clara Sewer and Storm System Supervisor: 408-752-6046 • Cupertino: 408-253-7071 (Cupertino Sanitation District for sewer system); 408-777-3200 (City of Cupertino for storm system); or 408-253-7863 (Mark Thomas; CuSD’s consultant) • City of San Jose Department of Transportation (owner of CSJ’s sanitary and storm systems): 408-408-6450 Resident or any
Reporting Party
Pump Station Alarm
from SCADA
Hotline/
Dispatch 1
Sewer On-
Call Staff 2
911/DPS (if hazmat
is involved) 4
Sewer Maintenance or
Hydro flushing crews
Data Submitters &
Legally Responsible
Officials (LRO) 3
Sewer
Standby Staff 2
Regulatory
Agencies 5
WW Collections
Supervisor 3
ESD
Director 3
Other Agencies &
Cities (if impacted) 9
ESD Regulatory
Compliance Group
(if FOG related) 8
During office hours
After office hours
Assess Spill & Clean Up.
See Section 3
Document, Report, and
Follow Up. See Section
ESD WPCP
(as needed) 6
Attachment 2
3. Sanitary Sewer Spill Emergency Response Procedure
The sanitary sewer spill emergency response procedure s described herein shall be followed for all spills, including those involving discharge from industries into the City’s sanitary sewer or storm systems. An abbreviated version of the procedure is included as Appendix E and a copy of which will be kept in City vehicles.
3.1. Safety
Whenever qualified City personnel respond to a report of a spill, they may encounter an emergency situation that requires immediate action. The most critical aspect of resolving an incident of this nature is to safely and competently perform the actions necessary to return the system or facility to normal operations as soon as possible in order to minimize public health and environmental impacts.
The most important item to remember during this type of incident is that safe operations always take precedence over expediency or shortcuts. Worker and public safety also take precedence over regulatory notifications and reporting.
Upon arrival at a spill site, the responder will conduct a hazard assessment to determine potential safety hazards, including the possibility that a spill may contain unknown hazardous waste or chemicals. On rare occasions, gasoline and industrial solvents have been found in the sewer system. If a hazard is suspected, the responding field crew should notify DPS Communications immediately and request the DPS Hazardous Materials Response Team to assist.
The LROs should also be notified of a spill as soon as possible. Personnel shall stay clear of any hazards and secure the area from the public.
Depending on the nature or cause of the spill, personnel may be required to remove a mainline blockage with a hydro- flusher, repair a damaged section of pipeline, or wash/clean a City s treet. At this point, it is essential that all standard safety procedures and/or duties be followed as deemed appropriate.
Typical responses may require personnel to implement the following types of safety procedures:
• Standard personal protective equipment (PPE),
• Confined space entry procedures,
• Traffic control,
• Heavy equipment operation, and/or
• Adequate communication via two-way radio and/or cellular telephone.
In summary, all personnel must diligently adhere to the following safety protocols prior to commencing any work:
(a) Personal Protective Equipment (PPE): Every individual must confirm that they are equipped with the appropriate personal protective gear suitable for their assigned tasks. (b) Safety Signage and Warning Devices: Prior to initiating any work, personnel must verify that all safety signs and warning devices are correctly installed and operational. (c) Field Observations and Documentation: Upon arrival at the site, personnel are encouraged to conduct thorough field observations, paying special attention to any spills or hazardous incidents. It is advised to capture photographs or other suitable documentation to ensure proper record-keeping.
3.2. Control the Cause of the Wastewater Spill
(a) Set out absorbent materials (e.g., Spill Shark) to contain the sewage overflow and prevent sewage runoff from entering into the storm system.
(b) Do whatever is necessary to correct the origin of the wastewater spill, or, if the overflow is caused by a stoppage in the sewer collection main, call for assistance and use the hydro- flushing truck to rel ieve the stoppage immediately.
Attachment 2
3.3. Main Line Stoppage and Overflow
(a) Check upstream and downstream manholes to determine between which two manholes the stoppage exists. (b) Flush or rod from first clear downstream manhole towards stoppage. (c) Capture and remove all debris if possible. If this cannot be done, check the downstream manholes for any sign of restrictions or the possibility of a second mainline stoppage. Where possible, flush the debris down to a larger main for better access.
(d) Immediately flush the area and wash down manholes and street, contain and remove any solid debris. Wash water is contained and disposed of using the Combo Unit and return to sewer main. (e) Collect as much of the SSO as possible and dispose back into the sanitary sewer system, estimating how much was captured and placed back into the sanitary sewer system. (f) Sanitize affected area if necessary.
3.4. Lateral Stoppage
(a) Check upstream and downstream manholes. If clear, stoppage must be in private sewer lateral or building plumbing.
(b) Check lateral and perform curtesy services if deemed safe . If lateral is clear, advise the property owner that the problem is likely in the building’s plumbing, and therefore their responsibility to correct. (c) When the cleanout is buried, inaccessible, non -conforming, or non-existent, the resident should be advised that the main line is clear and it is the responsibility of the property owner to clear the blockage in the private lateral. This may require the owner providing or installing appropriate access to the private sewer lateral for servicing.
(d) If a right-of-way cleanout exists and is accessible, the City may attempt to rod the lateral to the main and clear any stoppage that may exist as a courtesy service. If City staff cannot clear the stoppage, the property owner should be advised that the City lines are clear and it is the responsibility of the property owner to correct the problem in the private plumbing.
(e) If the stoppage or structural defect is in the portion of the lateral in the public right-of-way, the City may repair the line on a discretionary basis.
If City staff cannot resolve a lateral stoppage or structural defect, the City will turn the project over to the property owner and the property owner will have to complete the project at their expense.
3.5. Clean-up and Mitigation
(a) To minimize health hazards to the public and to protect the environment, start cleaning the wastewater spill area as soon as possible.
(b) Inspect the storm drain catch basins to determine whether wastewater has entered the storm system, and to what extent.
(c) Install air plugs or sandbags in storm lines to contain the discharge and/or wash water. Flush the area with water and vacuum up the excess or pump it back into the sanitary sewer collection system. (d) Remove all debris found in the wastewater spill area by vacuuming the surface area and disposing of the material as appropriate.
(e) Thoroughly inspect and sanitize the spill area before leaving.
Attachment 2
3.6. Sampling and Lab Tests
In the event of a spill reaching surface waters or drainage channels that could cause significant impact on water quality, water samples will be collected per steps and requirements outlined in Attachment E1 of the General Order (Appendix B), as long as staff deem it feasible and safe to do so. Specifically, water quality sampling will be conducted within 18 hours of initial knowledge of the spill if an estimated 50,000 gallons or more are discharged into surface water s or drainage channels. Water samples will be collected by the City’s Regulatory Programs Division (RPD) Laboratory or Compliance Inspection staff, who are trained in field sampling procedures. Furthermore, samples will be collected in accordance with sections 2.3.2 and 2.3.4 of Attachment E1 of the General Order and be analyzed for constituents specified in section 2.3.3 of the same attachment, and at the City's RPD laboratory , which is an Environmental Laboratory Accreditation Program (ELAP) certified laboratory.
Ideally, samples should be collected at the point of discharge and at upstream and d ownstream locations. The upstream location should be far enough from the spill to be unaffected by the spill. The appropriate number and location of downstream samples will depend on various factors including spill volume, volume or flow rate of receiving water, sample access, etc. Ideally, a “near field” downstream sample (e.g., 100 -ft downstream) and one or more “far field” samples (e.g., 500-ft, 1000-ft) should be collected. If tidal conditions are such that it is unclear as to what is “upstream” and “downstream” from the discharge location, analysis for conductivity may be useful.
Samples should be analyzed for ammonia, dissolved oxygen, and a bacterial indicator, preferably Enterococcus (the Laboratory is set up to perform both Enterococcus and total coliform analyses. The enterococcus analysis is preferred to characterize SSO impacts). Field observations should also be made at each sampling location, including any visual evidence of the spill, presence of odor, or evidence of fish kills. Follow-up sampling should be conducted on successive day(s) (or at other appropriate time intervals). Such sampling is used to document when conditions return to normal, or to establish that downstream levels of ammonia and the bacterial indicator are approximately equal or less than upstream levels, or less than the applicable limits for the appropriate beneficial use. Limits for ammonia are identified in the May 2017 Water Quality Control Plan (Basin Plan) for the San Francisco Bay Basin Plan. Applicable bacteriological limits, which supersede the Basin Plan, are identified in the February 2019 Bacteria Provisions for the Water Quality Control Plan for Inland Surface Waters, Enclosed Bays, and Estuaries of California. The limits are summarized as follows:
• Un-ionized ammonia: 0.4 mg/l as N, south of the Bay Bridge. • Escherichia coli (E. coli): The ba cteria water quality objective for all waters where the salinity is equal to or less than 1 part per thousand (ppth) 95 percent or more of the time during the calendar year is: a six -week rolling geometric mean of E. coli not to exceed 100 colony forming units (cfu) per 100 milliliters (mL), calculated weekly, and a statistical threshold value (STV) of 320 cfu/100 mL not to be exceeded by more than 10 percent of the samples collected in a calendar month, calculated in a static manner. • Enterococci: The bacteria water quality objective for all waters where the salinity is greater than 1 ppth more than 5 percent of the time during the calendar year is: a six- week rolling geometric mean of Enterococci not to exceed 30 cfu/100 mL, calculated weekly, with a STV of 110 cfu/100 mL not to be exceeded by more than 10 percent of the samples collected in a calendar month, calculated in a static manner Field staff will exercise their best judgment in deciding whether to conduct sampling and consult with the crew supervisor and/or the LROs. Water quality sampling should not be given precedence over stopping the spill, worker safety, or protection of public health. However, if sufficient personnel are available, sampling can be conducted in parallel with the clean-up effort.
3.7. Traffic Control during and after Clean-Up (Sign Posting and Barricading) (a) To limit public interference with clean-up activities or exposure to spills, secure the area with barricades and/or yellow caution tape.
(b) If the spill has entered an open creek, post warning signs and secure the area with barricades and/or yellow Attachment 2
caution tape. Do not remove the signs or barricades until the results of the lab tests show the area to have returned to background levels.
3.8. Recordkeeping and Follow-Up Work
To ensure proper documentation and follow-up work, the responders are required to complete a Spill Response Report (aka "yellow form") for all system blockages resulting in spills or a Surcharge Response Report (aka “green form”) for blockages that do not result in spills. They can be found in Appendix F and Appendix G, respectively. The completed reports should be submitted to the supervisor and LROs for review and determination of appropriate follow-up work.
After each spill or surcharge incident, a follow-up flushing must be conducted and documented in the City's operation and maintenance (O&M) database. Additionally, the affected pipe segment should be scheduled for CCTV inspections to determine any necessary follow -up work required to maintain the segment in a clear condition. Based on the inspection results, the recommended follow-up work will be scheduled, or the line segment will be added to one of the enhanced frequency cleaning lists, such as the 60-day, 90-day, or semi-annual lists, if needed.
For any mainline blockage that causes property damage, an evaluation will be conducted, and appropriate follow -up work will be scheduled, including spot repairs, structural pipe repairs, root sawing, and root foaming, as determined by CCTV inspections.
Responders and supervisor will also reconvene after each spill incident to evaluate the notification and response procedures, including identifying what worked, what did not work, and what can be improved. A Post-Spill Assessment form is attached in Appendix H. Recommended changes will be brought forward to the LROs, who will decide if the changes should be incorporated into future response procedures, at which time the supervisor will update the SOP and the LROs will update the SERP.
All Spill Response Reports, Surcharge Reports, and other related reports will be compiled and maintained in binders and/or a digital O&M database for a period of five (5) years.
4. Sanitary Sewer Spill Regulatory Notifications, Monitoring, Reporting, and Record Keeping In addition to notifying regulatory agencies and potentially affected entities identified in Figure 1, the LROs are also responsible for monitoring and reporting spill incidents according to the category of the spill , which is summarized in Table 2. Specific notification, monitoring, reporting, and recordkeeping requirements for each spill category are summarized in Table 3. Details of these requirements can be found in Attachment E1 of the General Order, which is attached as Appendix B of this document.
In general, responders will document all spill incidents using the City’s Spill Response Report in Appendix F. In the event that the reported incident is determined to be a surcharged manhole but does not result in a spill, the responder will report the incident using the City’s Surcharge Response Report in Appendix G.
Once the report is completed, t he Wastewater Collection S upervisor is responsible for reviewing and verifying the accuracy of the draft and submitting the final draft to the LROs for approval. Once approved, the Data Submitter will report the incident to the online CIWQS Sanitary Sewer System Database, and the LRO will certify the Spill Report within the timeframe specified in Attachment E1 of the General Order.
Attachment 2
Table 2: Spill Categories
Category Definition
1 A spill of any volume that reach any of the following:
• A surface water, including a surface water body that contains no flow or water; • A drainage conveyance system that discharges to surface waters when the spill is not fully captured and returned to the sanitary sewer system or disposed of properly unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.
A spill from a City-owned and/or operated lateral that discharges to a surface water is also considered a Category 1 spill.
2 Spills of 1,000 gallons or greater that do not discharge to surface waters, including a spill out of a lateral that is caused by a failure of blockage in the sanitary sewer system. 3 Spills of equal or greater than 50 gallons and less than 1,000 gallons that do not discharge to surface waters, including spills out of a lateral that is caused by a failure of blockage in the sanitary sewer system.
4 Spills less than 50 gallons that do not discharge to surface waters, including a spill out of a lateral that is caused by a failure of blockage in the sanitary sewer system.
N/A City-owned and/or operated lateral spills that do not discharge to surface waters.
Attachment 2
Table 2: Summary of Notification, Reporting, Monitoring, and Record Keeping Requirements Spill
Requirements Due Reference
Notification • Within two (2) hours of the Enrollee’s knowledge of a Category 1 or 2 spill of 1,000 gallons or greater, discharging or threatening to discharge to surface waters, notify the California OES at 1-800-852-7550 and obtain a notification control number.
• Within two (2) hours of the Enrollee’s knowledge of a spill of 1,000 gallons or greater, from an enrollee- owned and/or operated lateral, discharging or threatening to discharge to waters of the State, notify California Office of Emergency Services at 1-800-852-7550 and obtain a notification control number. Not applicable to a spill of less than 1,000 gallons.
Section 1 of
Attachm
ent E1 of
General Order
Monitoring • Category 1: Conduct spill-specific monitoring; conduct water quality sampling of the receiving water within 18 hours of initial knowledge of spill of 50,000 gallons or greater to surface waters. • Category 2, 3, 4: Conduct spill-specific monitoring.
• Enrollee Owned and/or Operated Lateral Spills: Conduct visual monitoring.
Section 2 of
Attachment E1 of
General Order
Reporting • Category 1: Submit Draft Spill Report within three (3) business days of the Enrollee’s knowledge of the spill; Submit Certified Spill Report within 15 calendar days of the spill end date; Submit Technical Report within 45 calendar days after the spill end date for a Category 1 spill in which 50,000 gallons or greater discharged to surface waters; and Submit Amended Spill Report within 90 calendar days after the spill end date. • Category 2: Submit Draft Spill Report within three (3) business days of the Enrollee’s knowledge of the spill; Submit Certified Spill Report within 15 calendar days of the spill end date; and Submit Amended Spill Report within 90 calendar days after the spill end date.
• Category 3: Submit monthly Certified Spill Report to the online CIWQS Sanitary Sewer System Database within 30 calendars days after the end of the month in which the spills occur; and Submit Amended Spill Reports within 90 calendar days after the Certified Spill Report due date. • Category 4: If, during any calendar month, Category 4 spills occur, certify monthly, the estimated total spill volume exiting the sanitary sewer system, and the total number of all Category 4 spills into the online CIWQS Sanitary Sewer System Database, within 30 days after the end of the calendar month in which the spills occurred. Upload and certify a report, in an acceptable digital format (a template is included in Appendix I), of all Category 4 spills to CIWQS by February 1st after the end of the calendar year in which the spills occur.
Sections 3 and 4 of
Attachment E1 of
General Order
Attachment 2
Spill
Requirements Due Reference
• Enrollee Owned and/or Operated Lateral Spills: Upload and certify a report, in an acceptable digital format, of all lateral spills (that do not discharge to a surface water) to the online CIWQS Sanitary Sewer System Database, by February 1st after the end of the calendar year in which the spills occur. Report a lateral spill of any volume that discharges to a surface water as a Category 1 spill.
Record Keeping The City will keep the following records on file for five (5) years and will make them available for review by Water Board staff during onsite inspections or through an information request. • Spill Reports and Surcharge Reports
• Records of Post-Spill Activities including records of follow-up flushing, CCTV inspections, and/or repairs. • Sanitary Sewer Management Plan (SSMP) implementation, audit, correction, modification, and update records • Audit Records pertaining to SSMP audits & other internal audits. • Equipment Records containing owned and leased sewer system cleaning, operational, maintenance, construction, and rehabilitation equipment.
• Work Orders for operations and maintenance projects.
Section 4 of
Attachment E1 of
General Order
Attachment 2
5. Sanitary Sewer Spill Response Equipment and Vehicles The Division owns and operates a fleet of vehicles and large equipment to handle sanitary sewer spills, as listed in Table 4. In addition to these in-house resources, the City also maintains a list of contractors who can be called upon for emergency response in situations where the City does not have sufficient resources, such as staff, vehicles, or equipment, to respond to a spill emergency promptly. Additionally, the City also maintains a list of plumbing contractors that could perform contract work on sewer main or lateral repairs as needed. A list of these contractors is included in Appendix D.
Table 4: In-House Vehicles and Large Equipment
Equipment
ID Type Description Year Make Model
768-4 Vehicle Dump Truck 2015 Ford F-650
655-1 Vehicle Crew Leader Truck 2014 Ford F-150
631-1 Vehicle Flushing Truck 2014 Ford F-450
641-9 Vehicle On-Call Truck 2022 Ford F-350
646-6 Vehicle Construction Truck 2011 Ford F-350
691-3 Vehicle Locates Van 2016 Ford Transit
503-3 Vehicle VacCon 2011 Freightliner M2106V
500-3 Vehicle VacCon 2014 Freightliner M2106V
518-0 Vehicle VacCon 2019 Freightliner 114SD
598-4 Vehicle Backhoe 2010 John Deere 310J
514-0 Vehicle CCTV Truck 2012 Ford E-450
590-3 Equipment Compressor 2011 Ingersoll Rand P185
301-2 Saw Concrete Saw 2015 Stihl TS800
309-2 Generator - Portable 3 KW on Truck 646 2008 Honda EU3000 368-0 Trailer Flatbed 2014 Jacobsen DTB-B-187
552-0 Equipment Mr. Manhole 2012 Case TR270
396-0 Trailer Emergency Response 2013 Pace American Journey 967-0 Equipment Skid Flusher on Truck 631 2013 US Jetting 4018-375 341 Generator 3KW on Truck 641 N/A Honda E-3000
361-0 Pump Trash Pump 2013 Wacker Neuson PT6LT
Attachment 2
6. Sanitary Sewer Spill Response Training
An in-house training was provided to the maintenance crew on May 3, 2023, to introduce the reissued General Order and its associated changes in procedures. The following topics were covered:
• Reissued General Order
• Revised spill categories and their corresponding notification, monitoring, and reporting procedures • Revised Spill Response Report and Surcharge Response Report • Latest SOP for Spill Response
• This Spill Emergency Response Plan and where to find a copy of it.
The maintenance crew also attended an Overflow Emergency Response training offered by the California Water and Environment Association (CWEA) on May 5, 2023.
On an on-going and regular basis, City provides both in-house and/or external training for the maintenance staff and their supervisor. The training covers topics such as re gulatory updates, response procedures , practice drills, and reporting protocols.
• All employees who may have a role in responding to, reporting, and/or mitigating a spill will receive training on an annual basis.
• All new employees will receive in-house training, including practice drills, within 6 months of starting their employment or before being placed in a position where they may have to respond in an independent manner, i.e., without the benefit of being accompanied by an experienced employee. • Employees are also encouraged to participate in spill response training and exercises offered by CWEA or other agencies, to the extent these opportunities can be accommodated within the Division’s workload schedule.
• The records for all scheduled training courses and for each spill emergency response training event or exercise are maintained by the supervisor, and include information on, at a minimum, date, time, place, content, name of trainer(s), and names of attendees.
7. Spill Emergency Response Plan (SERP) Reviews and Updates The supervisor and LROs will review and update the SERP during the first quarter of every year to confirm and update the following:
• Names and phone numbers of data submitters and LROs in Appendix C. • Names and phone numbers of entities involved in the notification process (Figure 1). • Sanitary sewer system map in Appendix A.
• List of available contractors in Appendix D.
• List of equipment and vehicles in Table 4.
• Response procedures in Section 3 and the latest version of the abbreviated SOP in Appendix E. • All forms, including the Spill Response Form, Surcharge Response Form, and Post-Spill Assessment Form. • Check the accuracy and completeness of records of spills, if any, of the previous year. • Check the accuracy and completeness of records of training for the previous year and identify training needs for the current year.
Attachment 2
City of Sunnyvale
Sanitary Sewer Spill Emergency Response Plan
Appendix A
Sanitary Sewer System Map
Attachment 2
West Channel
East Channel
ElCaminoSD
CalabazasCreek
Junipero Serra Channel
Stevens Creek
San Tomas Aquino Creek
Saratoga Creek
Sunken
Gardens LS
Arques LS
Kifer LS
Baylands LS
Lawrence LS
City Hall
WPCP
Sunnyvale City Boundary
City-Owned Facilities
Lift Station
Pressurized Mains
8" Gravity Mains
10" - 16" Gravity Mains
18" - 21" Gravity Mains
24" - 33" Gravity Mains
36" - 48" Gravity Mains
CountyofSantaClara,CaliforniaStateParks,Esri,HERE,Garmin,SafeGraph,GeoTechnologies,Inc,METI/NASA,USGS,BureauofLandManagement,EPA,NPS,USDA µ
0 1 20.5 Miles
Appendix A: Sanitary Sewer System Map (June 2023)
Mountain View
Santa
Clara
Cupertino
El Camino Real
237
101
85 280
San Jose
Attachment 2
City of Sunnyvale
Sanitary Sewer Spill Emergency Response Plan
Appendix B
Statewide Sanitary Sewer Systems General Order
2022-0103-DWQ
Attachment 2
1 STATE WATER RESOURCES CONTROL BOARD
1001 I Street, Sacramento, California 95814
ORDER WQ 2022-0103-DWQ
STATEWIDE WASTE DISCHARGE REQUIREMENTS
GENERAL ORDER FOR SANITARY SEWER SYSTEMS
This Order was adopted by the State Water Resources Control Board on December 6, 2022.
This Order shall become effective 180 days after the Adoption Date of this General Order, on June 5, 2023.
The Enrollee shall comply with the requirements of this Order upon the Effective Date of this General Order.
This General Order does not convey any property rights of any sort or any exclusive privileges.
The requirements prescribed herein do not authorize the commission of any act causing injury to persons or property, protect the Enrollee from liability under federal, state, or local laws, nor create a vested right for the Enrollee to continue the discharge of waste.
CERTIFICATION
I, Jeanine Townsend, Clerk to the Board, do hereby certify that this Order with all attachments is a full, true, and correct copy of the Order adopted by the State Water Board on December 6, 2022.
AYE: Chair E. Joaquin Esquivel
Vice Chair Dorene D’Adamo
Board Member Sean Maguire
Board Member Laurel Firestone
Board Member Nichole Morgan
NAY: None
ABSENT: None
ABSTAIN: None
for
Jeanine Townsend
Clerk to the Board
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
2 Table of Contents
1. Introduction .................................................................................................................... 4
2. Regulatory Coverage and Application Requirements .................................................... 5
2.1. Requirements for Continuation of Existing Regulatory Coverage ....................... 5
2.2. Requirements for New Regulatory Coverage ...................................................... 5
2.3. Regulatory Coverage Transfer ............................................................................ 7
3. Findings ......................................................................................................................... 7
3.1. Legal Authorities ................................................................................................. 7
3.2. General ............................................................................................................. 11
3.3. Water Quality Control Plans, Policies and Resolutions ..................................... 14
3.4. California Environmental Quality Act ................................................................. 16
3.5. State Water Board Funding Assistance for Compliance with Water Board Water Quality Orders ................................................................................................... 16
3.6. Notification to Interested Parties ....................................................................... 17
4. Prohibitions .................................................................................................................. 17
4.1 Discharge of Sewage from a Sanitary Sewer System ....................................... 17
4.2. Discharge of Sewage to Waters of the State..................................................... 17
4.3. Discharge of Sewage Creating a Nuisance ....................................................... 18
5. Specifications ............................................................................................................... 18
5.1. Designation of a Legally Responsible Official ................................................... 18
5.2. Sewer System Management Plan Development and Implementation ............... 18
5.3. Certification of Sewer System Management Plan and Plan Updates ................ 19
5.4. Sewer System Management Plan Audits .......................................................... 19
5.5. Six-Year Sewer System Management Plan Update .......................................... 21
5.6. System Resilience ............................................................................................. 22
5.7. Allocation of Resources .................................................................................... 22
5.8. Designation of Data Submitters ......................................................................... 22
5.9. Reporting Certification ....................................................................................... 22
5.10. System Capacity ............................................................................................... 23
5.11. System Performance Analysis .......................................................................... 23
5.12. Spill Emergency Response Plan and Remedial Actions ................................... 23
5.13. Notification, Monitoring, Reporting and Recordkeeping Requirements ............. 24
5.14. Electronic Sanitary Sewer System Service Area Boundary Map ....................... 26
5.15. Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems ................................................................................... 26
5.16. Voluntary Notification of Spills from Privately-Owned Laterals and/or Systems to the California Office of Emergency Services ..................................................... 27
5.17. Unintended Failure to Report ............................................................................ 27 Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
3 5.18. Duty to Report to Water Boards ........................................................................ 27
5.19. Operation and Maintenance ............................................................................... 27
6. Provisions .................................................................................................................... 27
6.1. Enforcement Provisions .................................................................................... 27
6.2. Other Regional Water Board Orders ................................................................. 30
6.3. Sewer System Management Plan Availability ................................................... 31
6.4. Entry and Inspection ......................................................................................... 31
Table of Attachments
Attachment A – Definitions ..................................................................................................... A-1 Attachment B – Application for Enrollment ............................................................................. B-1 Attachment C - Notice of Termination ..................................................................................... C-1 Attachment D – Sewer System Management Plan – Required Elements .............................. D-1 Attachment E1 – Notification, Monitoring, Reporting and Recordkeeping Requirements ..... E1-1 Attachment E2 – Summary of Notification, Monitoring and Reporting Requirements ........... E2-1 Attachment F – Regional Water Quality Control Board Contact Information .......................... F-1
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
4 1. INTRODUCTION
This General Order regulates sanitary sewer systems designed to convey sewage. For the purpose of this Order, a sanitary sewer system includes, but is not limited to, pipes, valves, pump stations, manholes, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks. A sanitary sewer system includes:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.
Sewage is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.
Sewage contains high levels of suspended solids, non-digested organic waste, pathogenic bacteria, viruses, toxic pollutants, nutrients, oxygen-demanding organic compounds, oils, grease, pharmaceuticals, and other harmful pollutants.
For the purpose of this General Order, a spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Sewage and its associated wastewater spilled from a sanitary sewer system may threaten public health, beneficial uses of waters of the State, and the environment.
This General Order serves as statewide waste discharge requirements and supersedes the previous State Water Resources Control Board (State Water Board) Order 2006-0003-DWQ and amendments thereafter. All sections and attachments of this General Order are enforceable by the State Water Board and Regional Water Quality Control Boards (Regional Water Boards). Through this General Order, the State Water Board requires an Enrollee to:
• Comply with federal and state prohibitions of discharge of sewage to waters of the State, including federal waters of the United States;
• Comply with specifications, and notification, monitoring, reporting and recordkeeping requirements in this General Order that implement the federal Clean Water Act, the California Water Code (Water Code), water quality control plans (including Regional Water Board Basin Plans) and policies;
• Proactively operate and maintain resilient sanitary sewer systems to prevent spills; • Eliminate discharges of sewage to waters of the State through effective implementation of a Sewer System Management Plan;
• Monitor, track, and analyze spills for ongoing system-specific performance improvements; and
• Report noncompliance with this General Order per reporting requirements.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
5 An Enrollee is a public, private, or other non-governmental entity that has obtained approval for regulatory coverage under this General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
o greater than one (1) mile in length (each individual sanitary sewer system); o one (1) mile or less in length where the State Water Board or a Regional Water Board requires regulatory coverage under this Order; or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Board or a Regional Water Board requires regulatory coverage under this Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.
For the purpose of this Order, a sanitary sewer system includes only systems owned and/or operated by the Enrollee.
2. REGULATORY COVERAGE AND APPLICATION REQUIREMENTS
2.1. Requirements for Continuation of Existing Regulatory Coverage To continue regulatory coverage from previous Order 2006-0003-DWQ under this General Order, within the 60-days-prior-to the Effective Date of this General Order, the Legally Responsible Official of an existing Enrollee shall electronically certify the Continuation of Existing Regulatory Coverage form in the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. The Legally Responsible Official will receive an automated CIWQS-issued Notice of Applicability email, confirming continuation of regulatory coverage under this General Order. All regulatory coverage under previous Order 2006-0003-DWQ will cease on the Effective Date of this Order.
An Enrollee continuing existing regulatory coverage is not required to submit a new application package or pay an application fee for enrollment under this General Order.
The annual fee due date for continued regulatory coverage from previous Order 2006-0003-DWQ to this General Order remains unchanged.
A previous Enrollee of Order 2006-0003-DWQ that fails to certify the Continuation of Existing Regulatory Coverage form in the online CIWQS database by the Effective Date of this Order is considered a New Applicant, and will not have regulatory coverage for its sanitary sewer system(s) until:
• A new application package for system(s) enrollment is submitted per section 2.2 (Requirements for New Regulatory Coverage) below; and
• The new application package is approved per section 2.2.2 (Approval of Application Package (For New Applicants Only)).
2.2. Requirements for New Regulatory Coverage
No later than 60 days prior to commencing and/or assuming operation and maintenance responsibilities of a sanitary sewer system, a duly authorized representative that Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
6 maintains legal authority over the public or private sanitary sewer system is required to enroll under this General Order by submitting a complete application package as specified below and as provided in Attachment B (Application for Enrollment Form) of this General Order.
Unless required by a Regional Water Board, a public agency that owns a combined sewer system subject to the Combined Sewer Overflow Control Policy (33 U.S. Code § 1342(q)), is not required to enroll, under this Order, the portions of its sanitary sewer system(s) that collects combined sanitary wastewater and stormwater.
2.2.1. Application Package Requirements
The Application for Enrollment package for new applicants must include the following items:
• Application for Enrollment Form. The form in Attachment B of this General Order must be completed, signed, and certified by a Legally Responsible Official, in accordance with section 5.1 (Designation of a Legally Responsible Official) of this General Order. If an electronic Application for Enrollment form is available at the time of application, a new applicant shall submit its application form electronically; and
• Application Fee. A fee payable to the “State Water Resources Control Board” in accordance with the Fee Schedule in the California Code of Regulations, Title 23, section 2200, or subsequent fee regulations updates.
The application fee for this General Order is based on the sanitary sewer system’s threat to water quality and complexity designations of category 2C or 3C, which is assigned based on the population served by the system. The current Fee Schedule for sanitary sewer systems is listed under subdivision (a)(2) at the following website:
Fee Schedule (https://www.waterboards.ca.gov/resources/fees/water_quality/).
2.2.2. Approval of Application Package (For New Applicants Only) The Deputy Director of the State Water Board, Division of Water Quality (Deputy Director) will consider approval of each complete Application for Enrollment package.
The Deputy Director will issue a Notice of Applicability letter which serves as approved regulatory coverage for the new Enrollee.
If the submitted application package is not complete in accordance with section 2.2.1 (Application Package Requirements) of this General Order, the Deputy Director will send a response letter to the applicant outlining the application deficiencies. The applicant will have 60 days from the date of the response letter to correct the application deficiencies and submit the identified items necessary to complete the application package to the State Water Board.
2.2.3. Electronic Reporting Account for New Enrollee
Within 30 days after the date of the Approval of Complete Application Package for System Enrollment, a duly authorized representative for the Enrollee shall obtain a CIWQS Sanitary Sewer System Database user account by clicking the “User Registration” button and following the directions on the CIWQS Login Page Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
7 (https://ciwqs.waterboards.ca.gov). If additional assistance is needed to establish an online CIWQS user account, contact State Water Board staff by email at [email protected]. The online user account will provide the Enrollee secure access to the online CIWQS database for electronic reporting.
2.3. Regulatory Coverage Transfer
Regulatory coverage under this General Order is not transferable to any person or party except after an existing Enrollee submits a written request for a regulatory coverage transfer to the Deputy Director, at least 60 days in advance of any proposed system ownership transfer. The written request must include a written agreement between the existing Enrollee and the new Enrollee containing:
• Acknowledgement that the transfer of ownership is solely of an existing system with an existing waste discharge identification (WDID) number; • The specific ownership transfer date in which the responsibility and regulatory coverage transfer between the existing Enrollee and the new Enrollee becomes effective; and
• Acknowledgement that the existing Enrollee is liable for violations occurring up to the ownership transfer date and that the new Enrollee is liable for violations occurring on and after the ownership transfer date.
The Deputy Director will consider approval of the written request. If approved, the Deputy Director will issue a Notice of Applicability letter which serves as an approved transfer of regulatory coverage to the new Enrollee.
3. FINDINGS
3.1. Legal Authorities
3.1.1. Federal and State Regulatory Authority
The objective of the Clean Water Act is to restore and maintain the chemical, physical, and biological integrity of the waters of the United States (33 U.S.C. 1251). The Water Code authorizes the State Water Board to implement the Clean Water Act in the State and to protect the quality of all waters of the State (Water Code sections 13000 and 13160).
3.1.2. Discharge of Sewage
A discharge of untreated or partially treated sewage is a discharge of waste as defined in Water Code section 13050(d) that could affect the quality of waters of the State and is subject to regulation by waste discharge requirements issued pursuant to Water Code section 13263 and Chapter 9, Division 3, Title 23 of the California Code of Regulations.
A discharge of sewage may pollute and alter the quality of the waters of the State to a degree that unreasonably affects the beneficial uses of the receiving water body or facilities that serve those beneficial uses (Water Code section 13050(l)(1)).
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
8 3.1.3 Water Boards Authority to Require Technical Reports, Monitoring, and Reporting Water Code sections 13267 and 13383 authorize the Regional Water Boards and the State Water Board to establish monitoring, inspection, entry, reporting, and recordkeeping requirements. Water Code section 13267(b), authorizes the Regional Water Boards to “require any person who has discharged, discharges, or is suspected of having discharged or discharging, or who proposes to discharge waste within its region… or is suspected of having discharged or discharging, or who proposes to discharge, waste outside of its region that could affect the quality of water within its region shall furnish, under penalty of perjury, technical or monitoring reports which the regional board requires…In requiring those reports, the regional board shall provide the person with a written explanation with regard to the need for the reports and shall identify the evidence that supports requiring that person to provide the reports.” Water Code section 13267(f) authorizes the State Water Board to require this information if it consults with the Regional Water Boards and determines that it will not duplicate the efforts of the Regional Water Boards. The State Water Board has consulted with the Regional Water Boards and made this determination.
The technical and monitoring reports required by this General Order and Attachment E (Notification, Monitoring, Reporting and Recordkeeping Requirements) are necessary to evaluate and ensure compliance with this General Order. The effort to develop required technical reports will vary depending on the system size and complexity and the needs of the specific technical report. The burden and cost of these reports are reasonable and consistent with the interest of the state in protecting water quality, which is the primary purpose of requiring the reports.
Water Code section 13383(a) authorizes the Water Boards to “establish monitoring, inspection, entry, reporting, and recordkeeping requirements… for any person who discharges, or proposes to discharge, to navigable waters, any person who introduces pollutants into a publicly owned treatment works, any person who owns or operates, or proposes to own or operate, a publicly owned treatment works or other treatment works treating domestic sewage, or any person who uses or disposes, or proposes to use or dispose, of sewage sludge.” Section 13383(b) continues, “the state board or the regional boards may require any person subject to this section to establish and maintain monitoring equipment or methods, including, where appropriate, biological monitoring methods, sample effluent as prescribed, and provide other information as may be reasonably required.”
Reporting of spills from privately owned sewer laterals and systems pursuant to section
5.15 (Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems) of this General Order is authorized by Water Code section 13225(c) and encouraged by the State Water Board, wherein a local agency may investigate and report on any technical factors involved in water quality control provided the burden including costs of such reports bears a reasonable relationship to the need for the report and the benefits to be obtained therefrom. The burden of reporting private spills under section 5.15 (Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems) is minimal and is outweighed by the benefit of providing Regional Water Boards an opportunity to respond to these spills Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
9 when an Enrollee, which in many cases has a contractual relationship with the owner of the private system, has knowledge of the spills.
3.1.4. Water Board Authority to Prescribe General Waste Discharge Requirements Water Code section 13263(i) provides that the State Water Board may prescribe general waste discharge requirements for a category of discharges if the State Water Board finds or determines that:
• The discharges are produced by the same or similar operations; • The discharges involve the same or similar types of waste; • The discharges require the same or similar treatment standards; and • The discharges are more appropriately regulated under general waste discharge requirements than individual waste discharge requirements.
Since 2006, the State Water Board has been regulating over 1,100 publicly owned sanitary sewer systems (See section 3.1.5 (Previous Statewide General Waste Discharge Requirements) of this General Order). California also has a large unknown number of unregulated privately owned sanitary sewer systems. All waste conveyed in publicly owned and privately owned sanitary sewer systems (as defined in this General Order) is comprised of untreated or partially treated domestic waste and/or industrial waste. Generally, sanitary sewer systems are designed and operated to convey waste by gravity or under pressure; system-specific design elements and system-specific operations do not change the common nature of the waste, the common threat to public health, or the common impacts on water quality. Spills of waste from a sanitary sewer system prior to reaching the ultimate downstream treatment facility are unauthorized and enforceable by the State Water Board and/or a Regional Water Board. Therefore, spills from sanitary sewer systems are more appropriately regulated under general waste discharge requirements.
As specified in Water Code sections 13263(a) and 13241, the implementation of requirements set forth in this Order is for the reasonable protection of past, present, and probable future beneficial uses of water and the prevention of nuisance. The requirements implement the water quality control plans (Basin Plans) for each Regional Water Board and take into account the environmental characteristics of sewer service areas and hydrographic units within the state. Additionally, the State Water Board has considered water quality conditions that could reasonably be achieved through the coordinated control of all factors that affect water quality, costs associated with compliance with these requirements, the need for developing housing within California, and the need to protect sources of drinking water and other water supplies.
3.1.5. Previous Statewide General Waste Discharge Requirements On May 2, 2006, the State Water Board adopted Order 2006-0003-DWQ serving as Waste Discharge Requirements pursuant to Article 4, Chapter 4, Division 7 of the Water Code (commencing with section 13260) for inadvertent discharges to waters of the State. Order 2006-0003-DWQ prohibited discharges of untreated or partially treated sewage. Order 2006-0003-DWQ also required system-specific management, operation, and maintenance of publicly owned sewer systems greater than one mile in length.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
10 To decrease the impacts on human health and the environment caused by sewage spills, the previous Order required enrollees to develop a rehabilitation and replacement plan that identifies system deficiencies and prioritizes short-term and long-term rehabilitation actions. The previous Order also required enrollees to:
1. Maintain information that can be used to establish and prioritize appropriate Sewer System Management Plan activities; and
2. Implement a proactive approach to reduce spills.
The previous Order required Sewer System Management Plan elements for “the proper and efficient management, operation, and maintenance of sanitary sewer systems, while taking into consideration risk management.”
On July 30, 2013, the State Water Board amended General Order 2006-0003-DWQ with Order WQ 2013-0058-EXEC, Amending Monitoring and Reporting Program for Statewide General Waste Discharge Requirements for Sanitary Sewer Systems.
Many enrollees of Order 2006-0003-DWQ have already implemented proactive measures to reduce sewage spills. Other enrollees, however, still need technical assistance and funding to improve sanitary sewer system operation and maintenance for the reduction of sewage spills.
3.1.6. Existing Memorandum of Agreement with California Water Environment Association
The California Water Environment Association is a nonprofit organization dedicated to providing water industry certifications, training, and networking opportunities. The Association’s Technical Certification Program provides accredited sanitary sewer system operator certification for collection system operators and maintenance workers.
On February 10, 2016, the State Water Board entered into a collaborative agreement with the Association titled Memorandum of Agreement Between the California State Water Resources Control Board and the California Water Environment Association - Training Regarding Requirements Set Forth in Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. The Memorandum sets forth collaborative training necessary for regulated sanitary sewer system personnel to operate and maintain a well operating system and ensure full compliance with statewide sewer system regulations.
On March 15, 2018, the State Water Board and the California Water Environment Association amended the existing Memorandum of Agreement to include collaborative outreach and expand training needs associated with further updates to Water Board regulations for sanitary sewer systems. The State Water Board encourages further Agreement updates as necessary to support improved sewer system operations and the professionalism of collection system operators.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
11 3.2. General
3.2.1. Waters of the State
Waters of the State include any surface water or groundwater, including saline waters, within the boundaries of the state as defined in Water Code section 13050(e), and are inclusive of waters of the United States.
3.2.2. Sanitary Sewer System Spill Threats to Public Health and Beneficial Uses Sewage contains high levels of suspended solids, pathogenic organisms, toxic pollutants, nutrients, oxygen-demanding organic compounds, oil and grease and other pollutants. Sewage spills may cause a public nuisance, particularly when sewage is discharged to areas with high public exposure such as streets and surface waters used for drinking, irrigation, fishing, recreation, or other public consumption or contact uses.
More specifically, sanitary sewer spills may:
• Adversely affect aquatic life and/or threaten water quality when reaching receiving waters;
• Inadvertently release trash, including plastics;
• Impair the recreational use and aesthetic enjoyment of surface waters by polluting surface water or groundwater;
• Threaten public health through direct public exposure to bacteria, viruses, intestinal parasites, and other microorganisms that can cause serious illness such as gastroenteritis, hepatitis, cryptosporidiosis, and giardiasis; • Negatively impact ecological receptors and biota within surface waters; and • Cause nuisance including odors, closure of beaches and recreational areas, and property damage.
Sanitary sewer system spills may pollute receiving waters and threaten beneficial uses of surface water and groundwater. Potentially threatened beneficial uses include, but are not limited to the following (with associated acronym representations as included in statewide water quality control plans and Regional Water Boards’ Basin Plans):
• Municipal and Domestic Supply (MUN)
• Water Contact Recreation (REC-1) and Non-Contact Water Recreation (REC-2) • Cold Freshwater Habitat (COLD)
• Warm Freshwater Habitat (WARM)
• Native American Culture (CUL)
• Wildlife Habitat (WILD)
• Rare, Threatened, or Endangered Species (RARE)
• Spawning, Reproduction, and/or Early Development (SPWN) • Wetland Habitat (WET)
• Agricultural Supply (AGR)
• Estuarine Habitat (EST)
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
12 • Commercial and Sport Fishing (COMM)
• Subsistence Fishing (SUB)
• Tribal Tradition and Culture (CUL)
• Tribal Subsistence Fishing (T-SUB)
• Aquaculture (AQUA)
• Marine Habitat (MAR)
• Preservation of Biological Habitats of Special Significance (BIOL) • Migration of Aquatic Organisms (MIGR)
• Shellfish Harvesting (SHELL)
• Industrial Process Supply (PROC)
• Industrial Service Supply (IND)
• Hydropower Generation (POW)
• Navigation (NAV)
• Flood Peak Attenuation/Flood Water Storage (FLD)
• Water Quality Enhancement (WQE)
• Fresh Water Replenishment (FRSH)
• Groundwater Recharge (GWR)
• Inland Saline Water Habitat (SAL)
3.2.3. Proactive Sanitary Sewer System Management to Eliminate Spill Causes Finding 3 of the previous Order, 2006-0003-DWQ, states: “Sanitary sewer systems experience periodic failures resulting in discharges that may affect waters of the state.
There are many factors (including factors related to geology, design, construction methods and materials, age of the system, population growth, and system operation and maintenance), which affect the likelihood of an SSO [sanitary sewer overflow].
A proactive approach that requires Enrollees to ensure a system-wide operation, maintenance, and management plan is in place will reduce the number and frequency of SSOs within the state. This approach will in turn decrease the risk to human health and the environment caused by SSOs.”
Many spills are preventable through proactive attention on sanitary sewer system management using the best practices and technologies available to address major causes of spills, including but not limited to:
• Blockages from sources including but not limited to:
o Fats, oils and grease;
o Tree roots;
o Rags, wipes and other paper, cloth and plastic products; and o Sediment and debris.
• Sewer system damage and exceedance of sewer system hydraulic capacity from identified system-specific environmental, and climate-change impacts, including but not limited to:
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
13 o Sea level rise impacts including flooding, coastal erosion, seawater intrusion, tidal inundation and submerged lands;
o Increased surface water flows due to higher intensity rain events; o Flooding;
o Wildfires and wildfire induced impacts;
o Earthquake induced damage;
o Landslides; and
o Subsidence.
• Infrastructure deficiencies and failures, including but not limited to:
o Pump station mechanical failures;
o System age;
o Construction material failures;
o Manhole cover failures;
o Structural failures; and
o Lack of proper operation and maintenance.
• Insufficient system capacity (temporary or sustained), due to factors including but not limited to:
o Excessive and/or increased storm or groundwater inflow/infiltration; o Insufficient capacity due to population increase and/or new connections from industrial, commercial and other system users; and
o Stormwater capture projects utilizing a sanitary sewer system to convey stormwater to treatment facilities for reuse.
• Community impacts, including but not limited to:
o Power outages;
o Vandalism; and
o Contractor-caused or other third party-caused damages.
3.2.4. Underground Sanitary Sewer System Leakage
Portions of some sanitary sewer systems may leak, causing underground exfiltration (exiting) of sewage from the system. Exfiltrated sewage that remains in the underground infrastructure trench and/or the soil matrix, and that does not discharge into waters of the State (surface water or groundwater) may not threaten beneficial uses.
Underground exfiltrated sewage may threaten beneficial uses if discharged to waters of the State. Exfiltrated sewage that discharges to groundwater may impact beneficial uses of groundwater and pollute groundwater supply. Additionally, if in close proximity, exfiltrated sewage may enter into a compromised underground drainage conveyance system that discharges into a water of the United States, or into groundwater that is hydrologically connected to (feeds into) a water of the United States, thus potentially causing: (1) a Clean Water Act violation, (2) threat and impact to beneficial uses, and/or (3) surface water pollution.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
14 3.2.5. Proactive Sanitary Sewer System Management to Reduce Inflow and Infiltration Excessive inflow (stormwater entering) and infiltration (groundwater seepage entering) to sanitary sewer systems is preventable through proactive sewer system management using the best practices and technologies available. The efficiency of the downstream wastewater treatment processes is dependent on the performance of the sanitary sewer system. When the structural integrity of a sanitary sewer system deteriorates, high volumes of inflow and infiltration can enter the sewer system. High levels of inflow and infiltration increase the hydraulic load on the downstream treatment plant, which can reduce treatment efficiency, lead to bypassing a portion of the treatment process, cause illegal discharge of partially treated effluent, or in extreme situations make biological treatment facilities inoperable (e.g., wash out the biological organisms that treat the waste).
3.3. Water Quality Control Plans, Policies and Resolutions The nine Regional Water Boards have adopted region-specific water quality control plans (commonly referred to as Basin Plans) that designate beneficial uses, establish water quality objectives, and contain implementation programs and policies to achieve those objectives. The State Water Board has adopted statewide water quality control plans, policies and resolutions establishing statewide water quality objectives, implementation programs and initiatives.
3.3.1. State Water Board Antidegradation Policy
On October 28, 1968, the State Water Board adopted Resolution 68-16, titled Statement of Policy with Respect to Maintaining High Quality of Waters in California, which incorporates the federal antidegradation policy. Resolution 68-16 requires that existing water quality be maintained unless degradation is justified based on specific findings.
The continued prohibition of sewage discharges from sanitary sewer systems into waters of the State aligns with Resolution 68-16. A sewage discharge from sanitary sewers to waters of the State is prohibited by this Order. Therefore, this Order does not allow degradation of waters of the State. In addition, this Order: (1) further expands the existing prohibition of sewage discharges to include waters of the State, in addition to waters of the United States as provided in previous Order 2006-0003-DWQ, and (2) enhances the ability for Water Board enforcement of violations of the established prohibitions.
3.3.2. State Water Board Sources of Drinking Water Policy On May 19,1988, the State Water Board adopted Resolution 88-63 (amended on February 1, 2006), titled Sources of Drinking Water, establishing state policy that all waters of the State, with certain exceptions, are suitable or potentially suitable for municipal or domestic supply.
3.3.3. State Water Board Cost of Compliance Resolution
On September 24, 2013, the State Water Board adopted Resolution 2013-0029, titled Directing Actions in Response to Efforts by Stakeholders on Reducing Costs of Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
15 Compliance While Maintaining Water Quality Protection. Through this resolution, the State Water Board committed to continued stakeholder engagement in identifying and implementing measures to reduce costs of compliance with regulatory orders while maintaining water quality protection and improving regulatory program outcomes.
3.3.4. State Water Board Human Right to Water Resolution On February 16, 2016, the State Water Board adopted Resolution 2016-0010, titled Adopting the Human Right to Water as a Core Value and Directing its Implementation in Water Board Programs and Activities, addressing the human right to water as a core value and directing Water Board programs to implement requirements to support safe drinking water for all Californians.
On November 16, 2021, the State Water Board adopted Resolution 2021-0050 titled Condemning Racism, Xenophobia, Bigotry, and Racial Injustice, and Strengthening Commitment to Racial Equity, Diversity, Inclusion, Access, and Anti-racism. Among other actions, through Resolution 2021-0050, the State Water Board, in summary as corresponding to this General Order, reaffirms its commitment to its Human Right to Water resolution, upholding that every human being in California deserves safe, clean, affordable, and accessible water for human consumption, cooking, and sanitation purposes. Resolution 2021-0050 provides the State Water Board commitment to:
• Protect public health and beneficial uses of waterbodies in all communities, including communities disproportionately burdened by wastes discharge of waste to land and surface water;
• Restore impaired surface waterbodies and degraded aquifers; and • Promote multi-benefit water quality projects.
Through Resolution 2021-0050, the State Water Board also commits to expanding implementation of its Climate Change Resolution to address the disproportionate effects of extreme hydrologic conditions and sea-level rise on Black, Indigenous, and people of color communities, prioritizing:
• The right to safe, clean, affordable, and accessible drinking water and sanitation; • Sustainable management and protection of local groundwater resources; • Healthy watersheds; and
• Access to surface waterbodies that support subsistence fishing.
On June 7, 2022, the State Water Board adopted a Resolution, titled Authorizing the Executive Director or Designee to Enter into One or More Multi-Year Contracts Up to a Combined Sum of $4,000,000 for a Statewide Wastewater Needs Assessment, supporting the equitable access to sanitation for all Californians and implementation of Resolutions 2016-0010 and 2021-0050.
This General Order supports the State Water Board priority in collecting a comprehensive set of data for California’s wastewater systems, including sanitary sewer systems. Data reported per the requirements of this Order will be used with data from other Water Boards’ programs, to further develop criteria and create a statewide risk Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
16 framework to prioritize critical funding and infrastructure investments for California’s most vulnerable populations, including disadvantaged or severely disadvantaged communities with inadequate or failing sanitation systems and threatened access to healthy drinking water supplies.
3.3.5. State Water Board Open Data Resolution
On July 10, 2018, the State Water Board adopted Resolution 2018-0032, titled Adopting Principles of Open Data as a Core Value and Directing Programs and Activities to Implement Strategic Actions to Improve Data Accessibility and Associated Innovation, directing regulatory programs to assure all monitoring and reporting requirements support the State Water Boards’ Open Data Initiative.
3.3.6. State Water Board Response to Climate Change
On March 7, 2017, the State Water Board adopted Resolution 2017-0012, titled Comprehensive Response to Climate Change, requiring a proactive response to climate change in all California Water Board actions, with the intent to embed climate change consideration into all programs and activities.
3.4. California Environmental Quality Act
The adoption of this Order is an action to reissue general waste discharge requirements that is exempt from the California Environmental Quality Act (Public Resources Code section 21000 et seq.) because it is an action taken by a regulatory agency to assure the protection of the environment and the regulatory process involves procedures for protection of the environment (Cal. Code Regs., Title 14, section 15308). In addition, the action to adopt this Order is exempt from CEQA pursuant to Cal. Code Regs., Title 14, section 15301, to the extent that it applies to existing sanitary sewer collection systems that constitute “existing facilities” as that term is used in sections 15301 and 15302, to the extent that it results in the repair or replacement of existing systems involving negligible or no expansion of capacity.
3.5. State Water Board Funding Assistance for Compliance with Water Board Water Quality Orders
The State Water Board, Division of Financial Assistance administers the implementation of the State Water Board financial assistance programs, per Board-adopted funding policies. Among other funding areas, the Division administers loan and grant funding for the planning and construction of wastewater and water recycling facilities per funding program-specific policies and guidelines. Applicants may apply for Clean Water State Revolving Fund low-interest loan, Small Community Wastewater grant funding assistance, and other funding available at the time of application, for some of the costs associated with complying with this General Order.
Funding applicants may obtain further information regarding current funding opportunities, and Division of Financial Assistance staff contact information at the following website: Financial Assistance Funding - Grants and Loans | California State Water Resources Control Board.
(https://www.waterboards.ca.gov/water_issues/programs/grants_loans/) Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
17 Section 13477.6 of the Water Code authorizes the Small Community Grant Fund.
The Small Community Grant Fund allows the State Water Board to provide grant funding assistance to small, disadvantaged communities and small severely disadvantaged communities that may not otherwise be able to afford a loan or similar financing for projects to comply with requirements of this General Order. The State Water Board also considers loan forgiveness on a disadvantaged community-specific basis.
For disadvantaged communities’ wastewater needs, the State Water Board places priority on the funding of projects that address:
• Public health;
• Violations of waste discharge requirements and National Pollutant Discharge Elimination System (NPDES) permits;
• Providing sewer system service to existing septic tank owners; and • High priority public health and water quality concerns identified by a Regional Water Board.
3.6. Notification to Interested Parties
On January 31, 2022, the State Water Board notified interested parties and persons of its intent to reissue Sanitary Sewer Systems General Order 2006-0003-DWQ by issuing a draft General Order for a 60-day public comment period. State Water Board staff conducted extensive stakeholder outreach and encouraged public participation in the adoption process for this General Order. On March 15, 2022, the State Water Board held a public meeting to hear and consider oral public comments. The State Water Board considered all public comments prior to adopting this General Order.
THEREFORE, IT IS HEREBY ORDERED, that pursuant to Water Code sections 13263, 13267, and 13383 this General Order supersedes Order 2006-0003-DWQ, Order WQ 2013-0058-EXEC, and any amendments made to these Orders thereafter, except for enforcement purposes and to meet the provisions contained in Division 7 of the Water Code (commencing with section 13000) and regulations adopted thereunder, and the provisions of the Clean Water Act and regulations and guidelines adopted thereunder, the Enrollee shall comply with the requirements in this Order.
4. PROHIBITIONS
4.1 Discharge of Sewage from a Sanitary Sewer System
Any discharge from a sanitary sewer system that has the potential to discharge to surface waters of the State is prohibited unless it is promptly cleaned up and reported as required in this General Order.
4.2. Discharge of Sewage to Waters of the State
Any discharge from a sanitary sewer system, discharged directly or indirectly through a drainage conveyance system or other route, to waters of the State is prohibited.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
18 4.3. Discharge of Sewage Creating a Nuisance
Any discharge from a sanitary sewer system that creates a nuisance or condition of pollution as defined in Water Code section 13050(m) is prohibited.
5. SPECIFICATIONS
5.1. Designation of a Legally Responsible Official
The Enrollee shall designate a Legally Responsible Official that has authority to ensure the enrolled sanitary sewer system(s) complies with this Order, and is authorized to serve as a duly authorized representative. The Legally Responsible Official must have responsibility over management of the Enrollee’s entire sanitary sewer system, and must be authorized to make managerial decisions that govern the operation of the sanitary sewer system, including having the explicit or implicit duty of making major capital improvement recommendations to ensure long-term environmental compliance.
The Legally Responsible Official must have or have direct authority over individuals that:
• Possess a recognized degree or certificate related to operations and maintenance of sanitary sewer systems, and/or
• Have professional training and experience related to the management of sanitary sewer systems, demonstrated through extensive knowledge, training and experience.
For example, a sewer system superintendent or manager, an operations manager, a public utilities manager or director, or a district engineer may be designated as a Legally Responsible Official.
The Legally Responsible Official shall complete the electronic CIWQS “User Registration” form (https://ciwqs.waterboards.ca.gov/ciwqs/newUser.jsp). A Legally Responsible Official that represents multiple enrolled systems shall complete the electronic CIWQS “User Registration” form for each system.
The Enrollee shall submit any change to its Legally Responsible Official, and/or change in contact information, to the State Water Board within 30 calendar days of the change by emailing [email protected] and copying the appropriate Regional Water Board as provided in Attachment F (Regional Water Quality Control Board Contact Information) of this General Order.
5.2. Sewer System Management Plan Development and Implementation To facilitate adequate local funding and management of its sanitary sewer system(s), the Enrollee shall develop and implement an updated Sewer System Management Plan.
The scale and complexity of the Sewer System Management Plan, and specific elements of the Plan, must match the size, scale and complexity of the Enrollee’s sanitary sewer system(s). The Sewer System Management Plan must address, at minimum, the required Plan elements in Attachment D (Sewer System Management Plan – Required Elements) of this General Order. To be effective, the Sewer System Management Plan must include procedures for the management, operation, and maintenance of the sanitary sewer system(s). The procedures must: (1) incorporate the Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
19 prioritization of system repairs and maintenance to proactively prevent spills, and (2) address the implementation of current standard industry practices through available equipment, technologies, and strategies.
For an existing Enrollee under Order 2006-0003-DWQ that has certified its Continuation of Existing Regulatory Coverage, per section 2.1 (Requirements for Continuation of Existing Regulatory Coverage) of this General Order:
Within six (6) months of the Adoption Date of this General Order:
• The Legally Responsible Official shall upload the Enrollee’s existing Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database.
For a new Enrollee:
Within twelve (12) months of the Application for Enrollment approval date:
• The governing entity of the new Enrollee shall approve its Sewer System Management Plan; and
• The Legally Responsible Official shall certify and upload its Sewer System Management Plan to the online CIWQS Sanitary Sewer System Database.
5.3. Certification of Sewer System Management Plan and Plan Updates The Legally Responsible Official shall certify and upload its Sewer System Management Plan and all subsequent updates to the online CIWQS Sanitary Sewer System Database.
5.4. Sewer System Management Plan Audits
The Enrollee shall conduct an internal audit of its Sewer System Management Plan, and implementation of its Plan, at a minimum frequency of once every three years. The audit must be conducted for the period after the end of the Enrollee’s last required audit period. Within six months after the end of the required 3-year audit period, the Legally Responsible Official shall submit an audit report into the online CIWQS Sanitary Sewer System Database per the requirements in section 3.10 (Sewer System Management Plan Audit Reporting Requirements) of Attachment E1 of this General Order.
Audit reports submitted to the CIWQS Sanitary Sewer System Database will be viewable only to Water Boards staff.
The internal audit shall be appropriately scaled to the size of the system(s) and the number of spills. The Enrollee’s sewer system operators must be involved in completing the audit. At minimum, the audit must:
• Evaluate the implementation and effectiveness of the Enrollee’s Sewer System Management Plan in preventing spills;
• Evaluate the Enrollee’s compliance with this General Order; • Identify Sewer System Management Plan deficiencies in addressing ongoing spills and discharges to waters of the State; and
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
20 • Identify necessary modifications to the Sewer System Management Plan to correct deficiencies.
The Enrollee shall submit a complete audit report that includes:
• Audit findings and recommended corrective actions;
• A statement that sewer system operators’ input on the audit findings has been considered; and
• A proposed schedule for the Enrollee to address the identified deficiencies.
A new Enrollee of this General Order (that did not have a sanitary sewer system enrolled in the previous State Water Board Order 2006-0003-DWQ) shall conduct its first internal Sewer System Management Plan audit for the time period between the date of submittal of its certified Sewer System Management Plan and the third subsequent December 31st date. The audit report must be submitted into the online CIWQS Sanitary Sewer System Database by July 1 of the following calendar year.
See the following tables for clarification:
Initial Audit Period and Audit Due Date for New Enrollees Audit Period Audit Due Date
New Enrollee
Certified Sewer System Management
Plan Submittal Date
through
the third subsequent December 31st date
July 1st date after
audit period
Example
Certified Sewer System Management
Plan Submittal Date of August 2, 2025
Audit Period of August 2, 2025 through
December 31, 2027
July 1, 2028
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
21 Initial Audit Period for Transition from 2-Year Audit Required in Previous Order 2006-0003-DWQ to 3-Year Audit Required in this General Order Audit Period Audit Due Date
An Enrollee
previously
regulated by Order
2006-003-DWQ
A 3-year period starting from the end of
last required 2-year Audit Period
Within six months
after end of 3-year
Audit Period
Example
Last required Audit Period start date of
August 2, 2021;
Audit Period of August 2, 2021 through
August 1, 2024
February 1, 2025
Three-Year Ongoing Audit Period
Audit Period Audit Due Date
Each Enrollee A 3-year period starting from the end of
last required Audit Period
Within six months
after end of 3-year
Audit Period
5.5. Six-Year Sewer System Management Plan Update
At a minimum, the Enrollee shall update its Sewer System Management Plan every six (6) years after the date of its last Plan Update due date. (For an Enrollee previously regulated by Order 2006-0003-DWQ, the six-year period shall commence on the due date identified in section 3.11 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this Order. The Updated Sewer System Management Plan must include:
• Elements required in Attachment D (Sewer System Management Plan – Required Elements) of this Order;
• Summary of revisions included in the Plan update based on internal audit findings; and
• Other sewer system management-related changes.
The Enrollee’s governing entity shall approve the updated Plan. The Legally Responsible Official shall upload and certify the approved updated Plan in the online CIWQS Sanitary Sewer System Database in accordance with section 3.11 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order. During the time period in between Plan updates, the Enrollee shall continuously document changes to its Sewer System Management Plan in a change log attached to the Plan.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
22 5.6. System Resilience
The Enrollee shall include and implement system-specific procedures in its Sewer System Management Plan to proactively prioritize: (1) operation and maintenance, (2) condition assessments, and (3) repair and rehabilitation, to address ongoing system resilience, as specified in Attachment D (Sewer System Management Plan – Required Elements) of this General Order.
5.7. Allocation of Resources
The Enrollee shall:
• Establish and maintain a means to manage all necessary revenues and expenditures related to the sanitary sewer system; and
• Allocate the necessary resources to its sewer system management program for:
o Compliance with this General Order,
o Full implementation of its updated Sewer System Management Plan, o System operation, maintenance, and repair, and
o Spill responses.
5.8. Designation of Data Submitters
The Legally Responsible Official may designate one or more individuals as a Data Submitter for reporting of spill data. The Legally Responsible Official shall authorize the designation of Data Submitter(s) through the online CIWQS database (https://ciwqs.waterboards.ca.gov) prior to the individuals establishing a CIWQS user account (https://ciwqs.waterboards.ca.gov/ciwqs/newUser.jsp) and entering spill data into the online CIWQS Sanitary Sewer System Database.
The Legally Responsible Official shall submit any change to its Data Submitter(s), and/or change in Data Submitter contact information, to the State Water Board within 30 calendar days of the change, by emailing [email protected] and copying the appropriate Regional Water Board as provided in Attachment F (Regional Water Quality Control Board Contact Information) of this General Order.
5.9. Reporting Certification
The Legally Responsible Official shall electronically certify, on the Enrollee’s behalf, all applications, reports, the Sewer System Management Plan(s) and corresponding updates, and other information submitted electronically into the online CIWQS Sanitary Sewer System Database, as follows:
“I certify under penalty of perjury under the laws of the State of California that the electronically submitted information was prepared under my direction or supervision.
Based on my inquiry of the person(s) directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is true, accurate, and complete, and complies with the Statewide Sanitary Sewer Systems General Order.
I am aware that there are significant penalties for submitting false information.” Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
23 Hardcopy submittals to the State Water Board must be accompanied by the above certification statement.
5.10. System Capacity
The Enrollee shall maintain the system capacity necessary to convey: (1) base flows during dry weather conditions, and (2) wet weather peak flows consistent with designated local historic storms. Design storms must take into account system-specific stormwater contributions via inflow and infiltration, and location-specific depth of groundwater and storm frequencies. The Enrollee shall implement capital improvements to provide adequate hydraulic capacity to:
• Meet or exceed the design criteria as defined in the Enrollee’s System Evaluation and Capacity Assurance element of its Sewer System Management Plan; and • Prevent system capacity-related spills, and adverse impacts to the treatment efficiency of downstream wastewater treatment facilities.
5.11. System Performance Analysis
The Enrollee shall include a running 10-year system performance analysis in its Annual Report. The analysis must include two CIWQS-generated graphs presenting the following information:
Graph 1 – Total Spill Volume per Year:
X axis: A 10-year period which includes the current calendar year and the nine previous calendar years;
Y axis: The total spill volume, per Spill Category, for each calendar year.
Graph 2 – Total Number of Spills per Year:
X axis: A 10-year period which includes the current calendar year and the nine previous calendar years;
Y axis: The total number of spills, per Spill Category, for each calendar year.
The current calendar year is the calendar year covered in the Annual Report.
The Enrollee shall generate the graphs in CIWQS, using the existing data in the online CIWQS Sanitary Sewer System Database at the following graph generation link:
(https://ciwqs.waterboards.ca.gov/ciwqs/readOnly/PublicReportSSOServlet?reportActio n=criteria&reportId=sso_operation_report).
5.12. Spill Emergency Response Plan and Remedial Actions For Existing Enrollees (with regulatory coverage under Order 2006-0003-DWQ):
Within six (6) months of the Adoption Date of this General Order, the Enrollee shall update and implement its Spill Emergency Response Plan, per Attachment D, section 6 (Spill Emergency Response Plan) of this General Order.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
24 For New Enrollees:
Within six (6) months of the Application for Enrollment approval date, the Enrollee shall develop and implement a Spill Emergency Response Plan, per Attachment D, section 6 (Spill Emergency Response Plan) of this General Order.
The Enrollee shall certify, in its Annual Report, that its Spill Emergency Response Plan is up to date.
The Spill Emergency Response Plan shall include measures to protect public health and the environment. The Enrollee shall respond to spills from its system(s) in a timely manner that minimizes water quality impacts and nuisance by:
• Immediately stopping the spill and preventing/minimizing a discharge to waters of the State;
• Intercepting sewage flows to prevent/minimize spill volume discharged into waters of the State;
• Thoroughly recovering, cleaning up and disposing of sewage and wash down water; and
• Cleaning publicly accessible areas while preventing toxic discharges to waters of the State.
5.13. Notification, Monitoring, Reporting and Recordkeeping Requirements The Enrollee shall comply with notification, monitoring, reporting, and recordkeeping requirements in Attachment E1 of this General Order.
5.13.1. Spill Categories
Individual spill notification, monitoring and reporting must be in accordance with the following spill categories:
• Category 1 Spill
A Category 1 spill is a spill of any volume of sewage from or caused by a sanitary sewer system regulated under this General Order that results in a discharge to:
o A surface water, including a surface water body that contains no flow or volume of water; or
o A drainage conveyance system that discharges to surface waters when the sewage is not fully captured and returned to the sanitary sewer system or disposed of properly.
Any spill volume not recovered from a drainage conveyance system is considered a discharge to surface water, unless the drainage conveyance system discharges to a dedicated stormwater infiltration basin or facility.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
25 A spill from an Enrollee-owned and/or operated lateral that discharges to a surface water is a Category 1 spill; the Enrollee shall report all Category 1 spills per section
3.1 of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.
• Category 2 Spill
A Category 2 spill is a spill of 1,000 gallons or greater, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.
A spill of 1,000 gallons or greater that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system, is a Category 2 spill. • Category 3 Spill
A Category 3 spill is a spill of equal to or greater than 50 gallons and less than 1,000 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.
A spill of equal to or greater than 50 gallons and less than 1,000 gallons, that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 3 spill.
• Category 4 Spill
A Category 4 spill is a spill of less than 50 gallons, from or caused by a sanitary sewer system regulated under this General Order that does not discharge to a surface water.
A spill of less than 50 gallons that spills out of a lateral and is caused by a failure or blockage in the sanitary sewer system is a Category 4 spill.
5.13.2. Annual Report
The Enrollee shall submit an Annual Report (previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.
For new Enrollees: Within 30 days of obtaining a CIWQS account, a new Enrollee shall submit its initial Annual Report, as specified in section 3.9 (Annual Report) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
26 5.14. Electronic Sanitary Sewer System Service Area Boundary Map For continuing enrollees, starting on July 1, 2025, and no later than December 31, 2025:
For new enrollees – no earlier than July 1, 2025, or within 12 months of the Application for Enrollment approval date, whichever date is later:
The Legally Responsible Official shall submit, to the State Water Board, geospatial data detailing the locations of the Enrollee’s sanitary sewer system service area boundary, per the required content and specifications in section 3.8 (Electronic Sanitary Sewer System Service Area Boundary Map) of Attachment E1 of this General Order, for each system identified by a WDID number.
An Enrollee of a disadvantaged community that may need assistance developing an electronic map to comply with this requirement, may contact State Water Board staff for assistance at [email protected].
5.15. Voluntary Reporting of Spills from Privately-Owned Sewer Laterals and/or Private Sanitary Sewer Systems
Within 24 hours of becoming aware of a spill (as described below) from a private sewer lateral or private sanitary sewer system that is not owned/operated by the Enrollee, the Enrollee is encouraged to report the following observations to the online CIWQS Sanitary Sewer System Database at the following link:
https://ciwqs.waterboards.ca.gov:
• A spill equal or greater than 1,000 gallons that discharges (or has a potential to discharge) to a water of the State, or a drainage conveyance system that discharges to waters of the State; or
• Any volume of sewage that discharges (or has a potential to discharge) to surface waters.
In the CIWQS module, the Enrollee is encouraged to identify:
• Time of observation;
• Description of general spill location (for example, street name and cross street names);
• Estimated volume of spill;
• If known, general description of spill destination (for example, flowing into drainage channel, flowing directly into a creek, etc.); and
• If known, name of private system owner/operator.
The CIWQS database will make the name and contact information of the entity voluntarily reporting a private spill, accessible to State and Regional Water Board staff only. The CIWQS database will only make information regarding the actual spill, accessible to the public.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
27 5.16. Voluntary Notification of Spills from Privately-Owned Laterals and/or Systems to the California Office of Emergency Services
Upon observing or acquiring knowledge of any of the following from a private sewer lateral or private sanitary sewer system that is not owned/operated by the Enrollee, the Enrollee is encouraged to notify the California Office of Emergency Services (as provided by Health and Safety Code section 5410 et. seq. and Water Code section 13271), or inform the responsible party that State law requires such notification to the Office of Emergency Services by any person that causes or allows a sewage discharge to waters of the State:
• A spill equal to 1,000 gallons or more that discharges (or has a potential to discharge) to waters of the State, or a drainage conveyance system that discharges to waters of the State; or
• A spill of any volume to surface waters.
5.17. Unintended Failure to Report
If an Enrollee becomes aware that they unintentionally failed to submit relevant facts in any report required in this General Order, the Enrollee shall promptly notify Regional Water Board and State Water Board staff. Regional Water Board contact information is included in Attachment F of this Order. State Water Board staff shall be contacted by email at [email protected] for assistance in formally amending the corresponding report(s) in the online CIWQS Sanitary Sewer System Database.
5.18. Duty to Report to Water Boards
In accordance with Water Code section 13267 and/or section 13383, upon request by the State Water Board Executive Director (or designee) or a Regional Water Board Executive Officer (or designee), the Enrollee shall provide the requested information which the State or Regional Water Board deems necessary to determine compliance with this General Order.
5.19. Operation and Maintenance
To prevent discharges to the environment, the Enrollee shall maintain in good working order, and operate as designed, any facility or treatment and control system designed to contain sewage and convey it to a treatment plant.
6. PROVISIONS
6.1. Enforcement Provisions
The following enforcement provisions are based on existing federal and state regulations, laws and policies, including the federal Clean Water Act, the state Water Code and the State Water Board Enforcement Policy.
6.1.1. Enforceability of Clean Water Act and Water Code Violations Noncompliance with requirements of this General Order or discharging sewage without enrolling in this General Order constitutes a violation of the Water Code and a potential Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
28 violation of the Clean Water Act and is grounds for an enforcement action by the State Water Board or the applicable Regional Water Board. Failure to comply with the notification, monitoring, inspection, entry, reporting, and recordkeeping requirements may subject the Enrollee to administrative civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement. Discharging waste not in compliance with the requirements of this General Order or the Clean Water Act may subject the Enrollee to administrative civil liabilities up to $10,000 a day per violation and additional liability up to $10 per gallon of discharge not cleaned up after the first 1,000 gallons of discharge; up to $5,000 a day per violation pursuant to Water Code section 13350 or up to $20 per gallon of waste discharged; or referral to the Attorney General for judicial civil enforcement.
6.1.2. Monetary Penalties
The Water Code provides the State and Regional Water Boards the authority to pursue formal enforcement actions, including imposing administrative liability and civil monetary penalties, for non-compliance with the requirements of this General Order and violations of the Clean Water Act.
6.1.3. Falsifying or Failure to Report
The Water Code provides that any person failing or refusing to furnish technical or monitoring program reports, as required under this General Order, or falsifying any information provided in the technical or monitoring reports is subject to administrative liability and civil monetary penalties. Any person who knowingly fails or refuses to furnish technical or monitoring program reports or falsifies any information provided in reports required by this General Order is subject to criminal penalties.
6.1.4. Severability of General Order
The provisions of this General Order are severable; if any provision of this Order, or the application of any provision of this Order to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this Order shall not be affected thereby.
6.1.5. Indirect Discharges
In the event that a spill enters into a drainage conveyance system, the Enrollee shall take all feasible steps to prevent discharge of sewage into waters of the State by blocking or redirecting the flow in the drainage conveyance system, removing the sewage from the drainage conveyance system, and cleaning the system in a manner that does not inadvertently impact beneficial uses of the receiving water body.
6.1.6. Water Boards’ Considerations for Discretionary Enforcement Consistent with the State Water Board Enforcement Policy, when considering Water Code section 13327 factors, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts to contain, control, clean up, and mitigate spills. In assessing the factors, the State Water Board or the applicable Regional Water Board will consider:
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
29 • The Enrollee’s compliance with this General Order with a focus on compliance with reporting requirements;
• The Enrollee’s provision of adequate funding to implement the requirements of this General Order;
• The Enrollee’s compliance with providing a complete and updated Sewer System Management Plan;
• The Enrollee’s compliance with implementing its Sewer System Management Plan; • The overall effectiveness of the Enrollee’s Sewer System Management Plan with respect to:
o System management, operation, and maintenance,
o Adequate treatment facilities, sanitary sewer system facilities, and/or components with an appropriate design capacity, to reasonably prevent spills (e.g. adequately enlarging treatment or collection facilities to accommodate growth, infiltration and inflow, etc.),
o Preventive maintenance (including cleaning, root grinding, and fats, oils, and grease control) and source control measures,
o Implementation of backup equipment,
o Inflow and infiltration prevention and control,
o Appropriate sanitary sewer system capacity to prevent spills, and o The Enrollee’s responsiveness to stop and mitigate the impact of the discharge; • The Enrollee’s compliance with identifying the cause of the spill; • The Enrollee’s use of available information and observations to accurately estimate the spill volume and identify the affected or potentially affected receiving waters; • The Enrollee’s thoroughness of cleaning up sewage in drainage conveyance systems after the spill(s);
• The Enrollee’s use of water quality and biological monitoring and assessment to determine the short-term and long-term impacts to beneficial uses and the environment;
• The Enrollee’s follow up actions to improve system performance; • The Enrollee’s implementation of feasible alternatives to prevent spills, such as:
o Use of temporary storage or waste retention,
o Reduction of system inflow and infiltration,
o Collection and hauling of waste to a treatment facility, o Prevention of and/ or containment of spills due to a design storm event identified in the Enrollee’s Sewer System Management Plan,
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
30 o Implementation of available equipment, technologies, strategies, and recommended industry practices for maintaining and managing sewer systems to prevent spills, and contain and eliminate discharges to waters of the State; and • The spill duration and factors beyond the reasonable control of the Enrollee causing the event.
6.1.7. Enforcement Discretion Based on Reporting Compliance Consistent with the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts to comply with spill reporting requirements when determining compliance with Water Code section 13267 and section 13383. When assessing Water Code section 13227 factors, the State Water Board or the applicable Regional Water Board will consider:
• The Enrollee’s diligence to comply with all reporting requirements in this General Order;
• The use of best available information for the Enrollee’s reporting of spill start date and start time in which the release of sewage from the sanitary sewer system initiated;
• The Enrollee’s reporting of spill end date, and end time to be the date and time in which the release of sewage from the sanitary sewer system was stopped; • The Enrollee’s diligence to accurately estimate and report spill volumes; • The Enrollee’s subsequent verification and/or updates to initial Draft Spill Reports in accordance with this General Order; and
• The Enrollee’s timely certification of required spill reports.
Consistent with Water Code section 13267 and section 13383, the State Water Board or a Regional Water Board may require an Enrollee to report the results of a condition assessment of a specified portion of the Enrollee’s sanitary sewer system.
6.2. Other Regional Water Board Orders
It is the intent of the State Water Board that sanitary sewer systems be regulated in a manner consistent with federal and state regulations. This Order will not be interpreted or applied:
• In a manner inconsistent with the federal Clean Water Act; • To authorize a spill or discharge that is illegal under either the Clean Water Act, the Water Code, and/or an applicable Basin Plan prohibition or water quality standard; • To prohibit a Regional Water Board from issuing an individual National Pollutant Discharge Elimination System (NPDES) permit or individual waste discharge requirements superseding an Enrollee’s regulatory coverage under this General Order for a sanitary sewer system authorized under the Clean Water Act or Water Code;
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER
ORDER 2022-0103-DWQ December 6, 2022
31 • To supersede any more specific or more stringent waste discharge requirements or enforcement orders issued by a Regional Water Board; or • To supersede any more specific or more stringent state or federal requirements in existing regulation, an administrative/judicial order, or Consent Decree.
6.3. Sewer System Management Plan Availability
The Enrollee’s updated Sewer System Management Plan must be maintained for public inspection at the Enrollee’s offices and facilities and must be available to the public through CIWQS and/or on the Enrollee’s website, in accordance with section 3.8 (Sewer System Management Plan Reporting Requirements) of Attachment E1 (Notification, Monitoring, Reporting and Recordkeeping Requirements) of this General Order.
6.4. Entry and Inspection
6.4.1. Entry and Availability of Information
The Enrollee shall allow State and Regional Water Board staff, upon presentation of credentials and other documents as may be required by law, to:
• Enter upon the Enrollee’s premises where a regulated facility or activity is located or conducted, or where records are kept under the requirements of this General Order; • Have access to and reproduce any records required to be maintained by this General Order;
• Inspect any facility and/or equipment (including monitoring and control equipment), practices, or operations required in this General Order; and • Sample or monitor substances or parameters for assuring compliance with this General Order, or as otherwise authorized by the Water Code.
6.4.2. Pre-Inspection Questionnaire
The Enrollee shall provide pre-inspection information to State and Regional Water Board staff through the completion of a Pre-Inspection Questionnaire provided by Water Board staff.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT A – DEFINITIONS December 6, 2022 A - 1
ATTACHMENT A - DEFINITIONS
Annual Report
An Annual Report (previously termed as Collection System Questionnaire in Order 2006-0003-DWQ) is a mandatory report in which the Enrollee provides a calendar-year update of its efforts to prevent spills.
Basin Plan
A Basin Plan is a water quality control plan specific to a Regional Water Quality Control Board (Regional Water Board), that serves as regulations to: (1) define and designate beneficial uses of surface and groundwaters, (2) establish water quality objectives for protection of beneficial uses, and (3) provide implementation measures.
Beneficial Uses
The term “Beneficial Uses” is a Water Code term, defined as the uses of the waters of the State that may be protected against water quality degradation. Examples of beneficial uses include but are not limited to, municipal, domestic, agricultural and industrial supply; power generation; recreation; aesthetic enjoyment; navigation; and preservation and enhancement of fish, wildlife, and other aquatic resources or preserves.
California Integrated Water Quality System (CIWQS)
CIWQS is the statewide database that provides for mandatory electronic reporting as required in State and Regional Water Board-issued waste discharge requirements.
Data Submitter
A Data Submitter is an individual designated and authorized by the Enrollee’s Legally Responsible Official to enter spill data into the online CIWQS Sanitary Sewer System Database. A Data Submitter does not have the authority of a Legally Responsible Official to certify reporting entered into the online CIWQS Sanitary Sewer System Database.
Disadvantaged Community
A disadvantaged community is a community with a median household income of less than eighty percent (80%) of the statewide annual median household income.
For the purpose of this General Order, there is no differentiation between a small and large disadvantaged community.
Drainage Conveyance System
A drainage conveyance system is a publicly- or privately-owned separate storm sewer system, including but not limited to drainage canals, channels, pipelines, pump stations, detention basins, infiltration basins/facilities, or other facilities constructed to transport stormwater and non-stormwater flows.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT A – DEFINITIONS December 6, 2022 A - 2
Enrollee
An Enrollee is a public, private, or other non-governmental entity that has obtained approval for regulatory coverage under this General Order, including:
• A state agency, municipality, special district, or other public entity that owns and/or operates one or more sanitary sewer systems:
• greater than one (1) mile in length (each individual sanitary sewer system); • one mile or less in length where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under this Order, or • A federal agency, private company, or other non-governmental entity that owns and/or operates a sanitary sewer system of any size where the State Water Resources Control Board or a Regional Water Quality Control Board requires regulatory coverage under this Order in response to a history of spills, proximity to surface water, or other factors supporting regulatory coverage.
Environmentally Sensitive Area
An environmentally sensitive area is a designated agricultural and/or wildlife area identified to need special natural landscape protection due to its wildlife or historical value.
Exfiltration
Exfiltration is the underground exiting of sewage from a sanitary sewer system through cracks, offset or separated joints, or failed infrastructure due to corrosion or other factors.
Flood Control Channel
A flood control channel is a channel used to convey stormwater and non-stormwater flows through and from areas for flood management purposes.
Governing Entity
A governing entity includes but is not limited to the following:
• A publicly elected governing board, council, or commission of a municipal agency; • A Department or Division director of a federal or state agency that is not governed by a board;
• A governing board or commission of an organization or association; and • A private system owner/manager that is not governed by a board.
Hydrologically Connected
Two waterbodies are hydrologically connected when one waterbody flows, or has the potential to flow, into the other waterbody. For the purpose of this General Order, groundwater is hydrologically connected to a surface water when the
groundwater feeds into the surface water. (The surface
waterbody in this example is termed a gaining stream as it gains flow from surrounding groundwater.)
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT A – DEFINITIONS December 6, 2022 A - 3
Lateral (including Lower and Upper Lateral)
A lateral is an underground segment of smaller diameter pipe that transports sewage from a customer’s building or property (residential, commercial, or industrial) to the Enrollee’s main sewer line in a street or easement. Upper and lower lateral boundary definitions are subject to local jurisdictional codes and ordinances, or private system ownership.
A lower lateral is the portion of the lateral located between the sanitary sewer system main, and either the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations.
An upper lateral is the portion of the lateral from the property line, sewer clean out, curb line, established utility easement boundary, or other jurisdictional locations, to the building or property.
Legally Responsible Official
A Legally Responsible Official is an official representative, designated by the Enrollee, with authority to sign and certify submitted information and documents required by this General Order.
Nuisance
For the purpose of this General Order, a nuisance, as defined in Water Code section 13050(m), is anything that meets all of the following requirements:
• Is injurious to health, or is indecent or offensive to the senses, or an obstruction to the free use of property, so as to interfere with the comfortable enjoyment of life or property; • Affects at the same time an entire community or neighborhood, or any considerable number of persons, although the extent of the annoyance or damage inflicted upon individuals may be unequal; and
• Occurs during, or as a result of, the treatment or disposal of wastes.
Private Sewer Lateral
A private sewer lateral is the privately-owned lateral that transports sewage from private property(ies) into a sanitary sewer system.
Private Sanitary Sewer System
A private sanitary sewer system is a sanitary sewer system of any size that is owned and/or operated by a private individual, company, corporation, or organization. A private sanitary sewer system may or may not connect into a publicly owned sanitary sewer system.
Potential to Discharge, Potential Discharge
Potential to Discharge, or Potential Discharge, means any exiting of sewage from a sanitary sewer system which can reasonably be expected to discharge into a water of the State based on the size of the sewage spill, proximity to a drainage conveyance system, and the nature of the surrounding environment.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT A – DEFINITIONS December 6, 2022 A - 4
Receiving Water
A receiving water is a water of the State that receives a discharge of waste.
Resilience
Resilience is the ability to recover from or adjust to adversity or change, and grow from disruptions. Resilience can be built through planning, preparing for, mitigating, and adapting to changing conditions.
Sanitary Sewer System
A sanitary sewer system is a system that is designed to convey sewage, including but not limited to, pipes, manholes, pump stations, siphons, wet wells, diversion structures and/or other pertinent infrastructure, upstream of a wastewater treatment plant headworks, including:
• Laterals owned and/or operated by the Enrollee;
• Satellite sewer systems; and/or
• Temporary conveyance and storage facilities, including but not limited to temporary piping, vaults, construction trenches, wet wells, impoundments, tanks and diversion structures.
For purpose of this Order, sanitary sewer systems include only systems owned and/or operated by the Enrollee.
Satellite Sewer System
A satellite sewer system is a portion of a sanitary sewer system owned or operated by a different owner than the owner of the downstream wastewater treatment facility ultimately treating the sewage.
Sewer System Management Plan
A sewer system management plan is a living document an Enrollee develops and implements to effectively manage its sanitary sewer system(s) in accordance with this General Order.
Sewage
Sewage, and its associated wastewater, is untreated or partially treated domestic, municipal, commercial and/or industrial waste (including sewage sludge), and any mixture of these wastes with inflow or infiltration of stormwater or groundwater, conveyed in a sanitary sewer system.
Spill
A spill is a discharge of sewage from any portion of a sanitary sewer system due to a sanitary sewer system overflow, operational failure, and/or infrastructure failure. Exfiltration of sewage is not considered to be a spill under this General Order if the exfiltrated sewage remains in the subsurface and does not reach a surface water of the State.
Training
Training is in-house or external education and guidance needed that provides the knowledge, skills, and abilities to comply with this General Order.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT A – DEFINITIONS December 6, 2022 A - 5
Wash Down Water
Wash down water is water used to clean a spill area.
Waste
Waste, as defined in Water Code section 13050(d), includes sewage and any and all other waste substances, liquid, solid, gaseous, or radioactive, associated with human habitation, or of human or animal origin, or from any producing, manufacturing, or processing operation, including waste placed within containers of whatever nature prior to, and for purposes of, disposal.
Waste Discharge Identification Number (WDID)
A waste discharge identification number (WDID) identifies each individual sanitary sewer system enrolled under this General Order. A WDID number is assigned to each enrolled system upon an Enrollee’s approved regulatory coverage.
Waters of the State
Waters of the State are surface waters or groundwater within boundaries of the state as defined in Water Code section 13050(e), in which the State and Regional Water Boards have authority to protect beneficial uses. Waters of the State include, but are not limited to, groundwater aquifers, surface waters, saline waters, natural washes and pools, wetlands, sloughs, and estuaries, regardless of flow or whether water exists during dry conditions.
Waters of the State include waters of the United States.
Waters of the United States
Waters of the United States are surface waters or waterbodies that are subject to federal jurisdiction in accordance with the Clean Water Act.
Water Quality Objective
A water quality objective is the limit or maximum amount of pollutant, waste constituent or characteristic, or parameter level established in statewide water quality control plans and Regional Water Boards’ Basin Plans, for the reasonable protection of beneficial uses of surface waters and groundwater and the prevention of nuisance.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 1
ATTACHMENT B – APPLICATION FOR ENROLLMENT
1. Enrollment Status: (Mark only one item)
☐ New Enrollee
☐ New Enrollee with previous regulatory coverage under Order 2006-0003-DWQ (that failed to certify continuation of coverage in CIWQS per Order 2022-XXXX-DWQ) Existing WDID Number: __________________________________________________
2. Applicant Information:
Legally Responsible Official Submitting Application
First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ System Owner/Operator Name: ______________________________________________ Mailing Address: ________________________________________________________ City, State, Zip: _________________________________________________________ County: _______________________________________________________________ Sanitary Sewer System Name: ____________________________________________ Regional Water Quality Control Board(s): ____________________________________ Signature and Date: _____________________________________________________
3. Applicant Type (Check one):
☐ City ☐ County ☐ State ☐ Federal ☐ Special District
☐ Government Combination ☐ Private ☐ Other Non-governmental Entity
4. Wastewater Treatment Plant Receiving Sanitary Sewer System Waste:
Wastewater Treatment Plant Permittee:________________________________________ WDID No.: ______________________________________________________________ Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT B – APPLICATION FOR ENROLLMENT December 6, 2022 B - 2
5. Billing Information
Billing Address: ___________________________________________________________ City, State, Zip: ___________________________________________________________ Billing Contact Person and Title: ______________________________________________ Phone and Email Address: __________________________________________________
6. Application Fee:
The application fee, as required by Water Code section 13260, is based on the daily population served by the sanitary sewer system. See updated Fee Schedule. (https://www.waterboards.ca.gov/resources/fees/water_quality/) Check one of the following and enter fee amount:
☐ Population Served < 50,000 – Total Fee submitted: $ ___________ ☐ Population Served ≥ 50,000 – Total Fee submitted: $ ___________ Make the fee payment payable to the State Water Resources Control Board and mail the complete application package to:
State Water Resources Control Board, Accounting Office
P. O. Box 1888
Sacramento, CA 95812-1888
Attention: Statewide Sanitary Sewer System Program
7. Application Submittal Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge and belief, the information in the submitted application package is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment.
Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________ Date: ________________ Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT C – NOTICE OF TERMINATION December 6, 2022
C - 1
ATTACHMENT C - NOTICE OF TERMINATION
1. Enrollee Information
Enrollee Name: ___________________________________________________________ WDID No: ________________________________________________________________ Legally Responsible Official Requesting Termination of Coverage: ___________________ First and Last Name: ____________________________________________________ Title: _________________________________________________________________ Phone: _______________________________________________________________ Email: ________________________________________________________________ Mailing Address: __________________________________________________________ City, State, Zip: ___________________________________________________________ County: _________________________________________________________________ Sanitary Sewer System Name(s) or Unique Identifier(s): ___________________________ Regional Water Quality Control Board(s): _______________________________________ Signature and Date: ________________________________________________________
2. Basis of Termination
Explanation of termination, including subsequent regulatory coverage and subsequent owner/operator of enrolled sanitary sewer system, as applicable:
________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT C – NOTICE OF TERMINATION December 6, 2022
C - 2
3. Regulatory Coverage Termination Certification
I certify under penalty of perjury under the laws of the State of California that to the best of my knowledge: 1) the sanitary sewer system I officially represent is not required to be regulated under the Statewide Waste Discharge Requirements for Sanitary Sewer Systems Order 2022-XXXX-DWQ, and 2) the information submitted in this Notice of Termination is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine or imprisonment. Additionally, I understand that the submittal of this Notice of Termination does not release sanitary sewer system agencies from liability for any violations of the Clean Water Act.
Print Name: ______________________________________________________________ Title: ___________________________________________________________________ Signature: __________________________________________ Date: ________________ For State Water Board Use Only
☐ Approved for Termination ☐ Denied and Returned to Enrollee Deputy Director of Water Quality Signature: _____________________________________ Date: ____________________ Notice of Termination Effective Date: __________________
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 1
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN – REQUIRED ELEMENTS Table of Contents
1. Sewer System Management Plan Goal And Introduction ............................................ D-2
1.1. Regulatory Context ........................................................................................... D-2
1.2. Sewer System Management Plan Update Schedule ......................................... D-3
1.3. Sewer System Asset Overview ......................................................................... D-3
2. Organization ................................................................................................................ D-3
3. Legal Authority ............................................................................................................. D-4
4. Operation And Maintenance Program .......................................................................... D-4
4.1. Updated Map of Sanitary Sewer System .......................................................... D-4
4.2. Preventive Operation and Maintenance Activities ............................................. D-4
4.3. Training ............................................................................................................. D-5
4.4. Equipment Inventory ......................................................................................... D-5
5. Design And Performance Provisions ........................................................................... D-5
5.1. Updated Design Criteria and Construction Standards and Specifications ......... D-5
5.2. Procedures and Standards ................................................................................ D-5
6. Spill Emergency Response Plan .................................................................................. D-6
7. Sewer Pipe Blockage Control Program ........................................................................ D-7
8. System Evaluation, Capacity Assurance and Capital Improvements ........................... D-7
8.1 System Evaluation and Condition Assessment ................................................. D-7
8.2. Capacity Assessment and Design Criteria ........................................................ D-8
8.3. Prioritization of Corrective Action ...................................................................... D-9
8.4. Capital Improvement Plan ................................................................................. D-9
9. Monitoring, Measurement and Program Modifications ................................................. D-9
10. Internal Audits ............................................................................................................ D-10
11. Communication Program ........................................................................................... D-10 Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 2
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN – REQUIRED ELEMENTS A Sewer System Management Plan (Plan) is a living planning document that documents ongoing local sewer system management program activities, procedures, and decision-making – at the scale necessary to address the size and complexity of the subject sanitary sewer system(s). This Plan may incorporate other programs and other plans by reference, to address short-term and long-term system resilience through:
• Proactive planning and decision-making;
• Local government ordinances;
• Updated operations and maintenance activities and procedures; • Implementation of capital improvements;
• Sufficient local budget to support staff resources, contractors, equipment, and training; and • Updated training of staff and contractors.
The Enrollee’s development, update, and implementation of a Sewer System Management Plan addressing the requirements of this Attachment is an enforceable component of this General Order. As specified in Provision 6.1 (Enforcement Provisions) of this General Order, consistent with the Water Code and the State Water Board Enforcement Policy, the State Water Board or a Regional Water Board may consider the Enrollee’s efforts in implementing an effective Sewer System Management Plan to prevent, contain, control, and mitigate spills when considering Water Code section 13327 factors to determine necessary enforcement of this General Order.
This Attachment includes the following required elements that the Enrollee shall address in its Plan and subsequent updates. The Enrollee shall identify any requirement in this Attachment that is not applicable to the Enrollee’s sewer system and shall explain in its Plan why the requirement is not applicable.
1. SEWER SYSTEM MANAGEMENT PLAN GOAL AND INTRODUCTION
The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and mitigate spills that do occur.
The Plan must include a narrative Introduction section that discusses the following items:
1.1. Regulatory Context
The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 3
1.2. Sewer System Management Plan Update Schedule
The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.
1.3. Sewer System Asset Overview
The Plan Introduction section must provide a description of the Enrollee-owned assets and service area, including but not limited to:
• Location, including county(ies);
• Service area boundary;
• Population and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons; • Structures diverting stormwater to the sewer system;
• Data management systems;
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals;
• Estimated number or percent of residential, commercial, and industrial service connections; and
• Unique service boundary conditions and challenge(s).
Additionally, the Plan Introduction section must provide reference to the Enrollee’s up- to-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of this Attachment.
2. ORGANIZATION
The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organization chart or similar narrative documentation that includes:
• The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of this General Order; • The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements;
• Organizational lines of authority; and
• Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 4
health officer, county environmental health agency, and State Office of Emergency Services.)
3. LEGAL AUTHORITY
The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
• Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure; • Require that sewer system components and connections be properly designed and constructed;
• Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee;
• Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and
• Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.
4. OPERATION AND MAINTENANCE PROGRAM
The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.
4.1. Updated Map of Sanitary Sewer System
An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.
4.2. Preventive Operation and Maintenance Activities
A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors.
The scheduling system must include:
• Inspection and maintenance activities;
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 5
• Higher-frequency inspections and maintenance of known problem areas, including areas with tree root problems;
• Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes.
The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to root-intrusion potentially resulting in system backup and/or failure.
4.3. Training
In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training must cover:
• The requirements of this General Order;
• The Enrollee’s Spill Emergency Response Plan procedures and practice drills; • Skilled estimation of spill volume for field operators; and • Electronic CIWQS reporting procedures for staff submitting data.
4.4. Equipment Inventory
An inventory of sewer system equipment, including the identification of critical replacement and spare parts.
5. DESIGN AND PERFORMANCE PROVISIONS
The Plan must include the following items as appropriate and applicable to the Enrollee’s system:
5.1. Updated Design Criteria and Construction Standards and Specifications Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of this Attachment, the procedures must include component-specific evaluation of the design criteria.
5.2. Procedures and Standards
Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 6
6. SPILL EMERGENCY RESPONSE PLAN
The Plan must include an up to date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State;
• Comply with the notification, monitoring and reporting requirements of this General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities;
• Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters; • Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in this General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 7
7. SEWER PIPE BLOCKAGE CONTROL PROGRAM
The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed.
The procedures must include, at minimum:
• An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances; • A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area; • The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages;
• Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements; • Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance;
• An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and • Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.
8. SYSTEM EVALUATION, CAPACITY ASSURANCE AND CAPITAL IMPROVEMENTS The Plan must include procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
• A capital improvement plan.
8.1 System Evaluation and Condition Assessment
The Plan must include procedures to:
• Evaluate the sanitary sewer system assets utilizing the best practices and technologies available;
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 8
• Identify and justify the amount (percentage) of its system for its condition to be assessed each year;
• Prioritize the condition assessment of system areas that:
o Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies; o Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas; o Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List;
• Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods;
• Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State;
• Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
• Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.
8.2. Capacity Assessment and Design Criteria
The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:
• Dry-weather peak flow conditions that cause or contributes to spill events; • The appropriate design storm(s) or wet weather events that causes or contributes to spill events;
• The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.
The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information; • Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions;
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 9
• Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change; • Increases of erosive forces in canyons and streams near underground and above- ground system components due to larger and/or higher-intensity storm events; • Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and • Necessary redundancy in pumping and storage capacities.
8.3. Prioritization of Corrective Action
The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills.
8.4. Capital Improvement Plan
The capital improvement plan must include the following items:
• Project schedules including completion dates for all portions of the capital improvement program;
• Internal and external project funding sources for each project; and • Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.
9. MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS
The Plan must include an Adaptive Management section that addresses Plan- implementation effectiveness and the steps for necessary Plan improvement, including:
• Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities;
• Monitoring the implementation and measuring the effectiveness of each Plan Element;
• Assessing the success of the preventive operation and maintenance activities; • Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
• Identifying and illustrating spill trends, including spill frequency, locations and estimated volumes.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ
ATTACHMENT D – SEWER SYSTEM MANAGEMENT PLAN
REQUIRED ELEMENTS December 6, 2022
D - 10
10. INTERNAL AUDITS
The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of this General Order.
11. COMMUNICATION PROGRAM
The Plan must include procedures for the Enrollee to communicate with:
• The public for:
o Spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and
o The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
o System operation, maintenance, and capital improvement-related activities.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 1
ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING AND
RECORDKEEPING REQUIREMENTS
Table of Contents
1. Notification Requirements ......................................................................................... E1-3
1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services ...................................................................................... E1-3
1.2. Spill Notification Information ........................................................................... E1-4
1.3. Notification of Spill Report Updates ................................................................ E1-4
2. Spill-Specific Monitoring Requirements .................................................................... E1-5
2.1 Spill Location and Spread .............................................................................. E1-5
2.2 Spill Volume Estimation.................................................................................. E1-5
2.3. Receiving Water Monitoring ............................................................................ E1-5
2.4. Safety and Access Exceptions ........................................................................ E1-8
3. Reporting Requirements ............................................................................................ E1-8
3.1. Reporting Requirements for Individual Category 1 Spill Reporting ................. E1-8
3.2. Reporting Requirements for Individual Category 2 Spill Reporting ............... E1-12
3.3. Monthly Certified Spill Reporting for Category 3 Spills .................................. E1-14
3.4. Monthly Certified Spill Reporting for Category 4 Spills .................................. E1-16
3.5. Amended Certified Spill Reports for Category 3 Spills .................................. E1-16
3.6. Annual Certified Spill Reporting of Category 4 and/or Lateral Spills ............. E1-16
3.7. Monthly Certification of “No-Spills” or “Category 4 Spills” and/or “Non-Category 1 Lateral Spills” ................................................................................................ E1-16
3.8. Electronic Sanitary Sewer System Service Area Boundary Map ................... E1-17
3.9. Annual Report (Previously termed as Collection System Questionnaire in General Order 2006-0003-DWQ) .................................................................. E1-17
3.10. Sewer System Management Plan Audit Reporting Requirements ................ E1-19
3.11. Sewer System Management Plan Reporting Requirements ......................... E1-19
4. Recordkeeping Requirements ................................................................................. E1-20
4.1. Recordkeeping Time Period .......................................................................... E1-20
4.2. Availability of Documents .............................................................................. E1-20
4.3. Spill Reports .................................................................................................. E1-20
4.4. Recordkeeping of Category 4 Spills and Non-Category 1 Lateral Spills ....... E1-21
4.5. Sewer System Telemetry Records ................................................................ E1-22
4.6. Sewer System Management Plan Implementation Records ......................... E1-22
4.7. Audit Records ................................................................................................ E1-23 Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 2
4.8. Equipment Records ....................................................................................... E1-23
4.9. Work Orders .................................................................................................. E1-23
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 3
ATTACHMENT E1– NOTIFICATION, MONITORING, REPORTING AND RECORDKEEPING
REQUIREMENTS
The Notification Requirements (section 1), Spill-specific Monitoring Requirements (section 2), Reporting Requirements (section 3) and Recordkeeping Requirements (section 4) in this Attachment are pursuant to Water Code section 13267 and section 13383, and are an enforceable component of this General Order. For the purpose of this General Order, the term:
• Notification means the notifying of appropriate parties of a spill event or other activity. • Spill-specific Monitoring means the gathering of information and data for a specific spill event to be reported or kept as records.
• Reporting means the reporting of information and data into the online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database. • Recordkeeping means the maintaining of information and data in an official records storage system.
Failure to comply with the notification, monitoring, reporting and recordkeeping requirements in this General Order may subject the Enrollee to civil liabilities of up to $10,000 a day per violation pursuant to Water Code section 13385; up to $1,000 a day per violation pursuant to Water Code section 13268; or referral to the Attorney General for judicial civil enforcement.
Water Code section 13193 et seq. requires the Regional Water Quality Control Boards (Regional Water Boards) and the State Water Resources Control Board ( State Water Board ) to collect sanitary sewer spill information for each spill event and make this information available to the public. Sanitary sewer spill information for each spill event includes but is not limited to: Enrollee contact information for each spill event, spill cause, estimated spill volume and factors used for estimation, location, date, time, duration, amount discharged to waters of the State, response and corrective action(s) taken.
1. NOTIFICATION REQUIREMENTS
1.1. Notification of Spills of 1,000 Gallons or Greater to the California Office of Emergency Services
Per Water Code section 13271, for a spill that discharges in or on any waters of the State, or discharges or is deposited where it is, or probably will be, discharged in or on any waters of the State, the Enrollee shall notify the California Office of Emergency Services and obtain a California Office of Emergency Services Control Number as soon as possible but no later than two (2) hours after:
• The Enrollee has knowledge of the spill; and
• Notification can be provided without substantially impeding cleanup or other emergency measures.
The notification requirements in this section apply to individual spills of 1,000 gallons or greater, from an Enrollee-owned and/or operated laterals, to a water of the State.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 4
1.2. Spill Notification Information
The Enrollee shall provide the following spill information to the California Office of Emergency Services before receiving a Control Number, as applicable:
• Name and phone number of the person notifying the California Office of Emergency Services;
• Estimated spill volume (gallons);
• Estimated spill rate from the system (gallons per minute); • Estimated discharge rate (gallons per minute) directly into waters of the State or indirectly into a drainage conveyance system;
• Spill incident description:
o Brief narrative of the spill event, and
o Spill incident location (address, city, and zip code) and closest cross streets and/or landmarks;
• Name and phone number of contact person on-scene;
• Date and time the Enrollee was informed of the spill event; • Name of sanitary sewer system causing the spill;
• Spill cause or suspected cause (if known);
• Amount of spill contained;
• Name of receiving water body receiving or potentially receiving discharge; and • Description of water body impact and/ or potential impact to beneficial uses.
1.3. Notification of Spill Report Updates
Following the initial notification to the California Office of Emergency Services and until such time that the Enrollee certifies the spill report in the online CIWQS Sanitary Sewer System Database, the Enrollee shall provide updates to the California Office of Emergency Services regarding substantial changes to:
• Estimated spill volume (increase or decrease in gallons initially estimated); • Estimated discharge volume discharged directly into waters of the State or indirectly into a drainage conveyance system (increase or decrease in gallons initially estimated); and
• Additional impact(s) to the receiving water(s) and beneficial uses.
Attachment 2
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ ATTACHMENT E1 – NOTIFICATION, MONITORING, REPORTING
AND RECORDKEEPING REQUIREMENTS December 6, 2022
E1 - 5
2. SPILL-SPECIFIC MONITORING REQUIREMENTS
2.1 Spill Location and Spread
The Enrollee shall visually assess the spill location(s) and spread using photography, global positioning system (GPS), and other best available tools. The Enrollee shall document the critical spill locations, including:
• Photography and GPS coordinates for:
o The system location where spill originated.
For multiple appearance points of a single spill event, the points closest to the spill origin.
• Photography for:
o Drainage conveyance system entry locations,
o The location(s) of discharge into surface waters, as applicable, o Extent of spill spread, and
o The location(s) of clean up.
2.2 Spill Volume Estimation
To assess the approximate spill magnitude and spread, the Enrollee shall estimate the total spill volume using updated volume estimation techniques, calculations, and documentation for electronic reporting. The Enrollee shall update its notification and reporting of estimated spill volume (which includes spill volume recovered) as further information is gathered during and after a spill event.
2.3. Receiving Water Monitoring
2.3.1. Receiving Water Visual Observations
Through visual observations and use of best available spill volume-estimating techniques and field calculation techniques, the Enrollee shall gather and document the following information for spills discharging to surface waters:
• Estimated spill travel time to the receiving water;
• For spills entering a drainage conveyance system, estimated spill travel time from the point of entry into the drainage conveyance system to the point of discharge into the receiving water;
• Estimated spill volume entering the receiving water; and • Photography of:
o Waterbody bank erosion,
o Floating matter,
o Water surface sheen (potentially from oil and grease), Attachment 2