City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
53 Maps
-
$
$
$
0%
54 Certificate Of Compliance (in addition to any
Public Works fees)
2.00 $ 1,753.40
$ 217.06
$ 1,536.34
808%
55 Condominium Conversion (Actual Time at Staff
Cost -Recovery Hourly Rates) [Calculated cost
is to establish a potential deposit amount.]
-
$ 6,076.40
$ 34,589.54
$ (28,513.14)
189/6
56 Condominium Map
1.00 $ 15,758.60
$ 10,121.08
$ 5,637.52
156%
57 Lot Line Adjustment (in addition to any Public
Works fees)
4.00 $ 1,773.20
$ 1,230.84
$ 542.36
144°/u
58 Minor Change To Approved Tentative Map
1.00 $ 2,686.20
$ 5,248.38
$ (2,562.18)
51%
60 lic
Phasin7PIan For Tentative Map
1.00 $ 4,802.60
$ 9
$ 6,623.61
9)
$ (1,821.01)
73%
61 Reverso Acreage
-
$ 1,023.00
$ 15,704.93
$ (14,681.93)
7°/u62
TPM Cercial Industrial Standard
2.00 $ 7,517.40
$ 12,836.41
$ (5,319.01)
59%
63 TPM Cercial Industrial with Waiver
0.10 $ 5,056.70
$ 10,427.19
$ (5,370.49)
48%
64 TPM Rntial Standard
2.00 $ 5,394.40
$ 15,708.12
$ (10,313.72)
34%
65 TPM Residential wth Waiver- Final Map
-
$ 4,319.70
$ 12,713.93
$ (8,394.23)
34%
66 TPM Revised
0.20 $ 4,699.20
$ 9,955.03
$ (5,255.83)
47%
67 TPM Vesting
0.20 $ 4,728.00
$ 15,570.00
$ (10,842.00)
30%
68 0
-
$ -
$ -
$ -
0%
69 TTM Standard - 5-34 Lots/Units (flat fee)
1.20 $ 16,019.30
$ 20,733.83
$ (4,714.53)
77°/u
70 TTM Standard - Additional Unit Fee per lot
above 34 lots
0.20 $ -
$ 419.01
$ (419.01)
0%
71 TTM Standard Revised Map
0.50 $ 8,021.20
$ 11,735.71
$ (3,714.51)
68%
72 0
-
$ -
$ -
$ -
0%
73 TTM Vesting 5 - 34 lots/units (flat fee)
0.40 $ 20,181.70
$ 23,630.21
$ (3,448.51)
85%
74 TTM Vesting - Additional Unit Fee per lot above
34 lots
0.20 $ -
$ 419.01
$ (419.01)
0%
75 TTM Vesting Revised Map
0.20 $ 11,288.20
$ 12,843.61
$ (1,555.41)
88%
76 0
-
$ -
$ -
$ -
0%
Wohlford Consulting Appendix 2 - Page 3 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
77 Massage Permits
-
$
$
$
0%
78 Massage Establishment Permit
13.00 $ 816.00
$ 2,626.30
$ (1,810.30)
31 %
79 Massage Establishment Permit Renewal
25.00 $ 331.00
$ 1,734.03
$ (1,403.03)
19%
80 Massage Technician License [This service is
now a state responsibility.]
-
$
$ -
$
0%
81 0
$
$
$
0%
82 Minor Exception
-
$
$ -
$ -
0%
83 Minor Exception - General
4.00 $ 697.00
$ 4,371.45
$ (3,674.45)
16%
84 Minor Exception - Individual Homeowner
3.00 $ 174.00
$ 1,332.12
$ (1,158.12)
13%
85 Modifications
-
$ -
$ -
$ -
0%
86 Major Modification
6.00 $ 8,311.60
$ 15,300.12
$ (6,988.52)
54%
87 Minor Modification
16.00 $ 3,595.90
$ 6,308.79
$ (2,712.89)
57%
88 Minor Modification - Plan Review Only
90.00 $ 221.00
$ 3,427.79
$ (3,206.79)
6%
89 Minor Modification - Plan Review Only
(Individual Homeowner)
49.00 $ 221.00
$ 2,270.92
$ (2,049.92)
100/6
90 Municipal Code Amendment
-
$ -
$ -
$ -
0%
91 Municipal Code Amendment
0.20 $ 8,006.90
$ 39,629.22
$ (31,622.32)
20%
92 Planned Development Overlay
$ -
$ -
0%
93 Planned Development Overlay
1.00 $ 42,203.70
$ 57,257.64
$ (15,053.94)
74%
94 Planned Development Overlay - Amendment
0.20 $ -
$ 33,649.81
$ (33,649.81)
0%
V5
KeSidentialract Florne Product Review
-
$
-
-
o
96 Residential Tract Home Product Review
3.00 $ 13,894.00
$ 23,468.53
$ (9,574.53)
59%
97 Accessory Dwelling Unit
-
$
$ -
$ -
0%
98 Accessory Dwelling Unit
2.00 $ 1,027.40
$ 4,226.82
$ (3,199.42)
24%
99 0
-
$ -
$ -
$
0%
100
Signage
-
$
$ -
$
0%
101
Sign Program Amendment
8.00 $
$ 5,738.25
$ (5,738.25)
0%
102
Sign Program - New
5.00 $ 3,469.00
$ 13,614.99
$ (10,145.99)
25%
103
0 -
$ -
$ -
$
0%
104
Specific Plan 9
$ -
$ -
$
00/0
105
Specific Plan - New
0.10 $ 114,706.90
$ 157,802.08
$ (43,095.18)
73%
106
Specific Plan Amendment - Major
0.50 $ 45,526.80
$ 80,431.26
$ (34,904.46)
57%
107
Specific Plan Amendment - Minor
1.00 $ 15,885.10
$ 43,362.65
$ (27,477.55)
37%
108
0 -
$ -
$ -
$
0%
109
Temporary Use Permits
-
$
$ -
$ -
0%
110
Temporary Use Permit - Minor Regular
10.00 $ 150.00
$ 1,851.28
$ (1,701.28)
8%
111
Temporary Use Permit - Major Regular
32.00 $ 300.00
$ 3,292.35
$ (2,992.35)
9%
112
Temporary Use Permit - Major Non Profit
6.00 $ 100.00
$ 3,109.99
$ (3,009.99)
3%
113
Temporary Use Permit - Minor Non Profit
2.00 $ 75.00
$ 1,851.20
$ (1,776.20)
4%
114
Temporary Use Permit - Model Home Complex
2.00 $ 17.00
$ 4,764.82
$ (4,747.82)
00/6
115
Temporary Use Permit - Sales / Construction
Trailer
3.00 $ 17.00
$ 4,364.64
$ (4,347.64)
0%
116
0 -
$ -
$ -
$
0%
117
Variance
-
$
$ -
$ -
0%
118
Variance
0.10 $ 5,204.10
$ 25,970.92
$ (20,766.82)
20%
Wohlford Consulting Appendix 2 - Page 4 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
119
Vendors License
-
$
$
$
0%
120
Vendors License
2.00 $ 66.00
$ 1,667.87
$ (1,601.87)
4%
121
0 -
$ -
$ -
$
0%
122
Wireless Antenna Facility
-
$
$ -
$
00/0
123
Wireless Antenna Facility -Administrative
Review
5.00 $
$ 5,527.07
$ (5,527.07)
0%
124
Wireless Antenna Facility - Revision with Public
Hearing
2.00 $
$ 9,995.16
$ (9,995.16)
0%
125
Wireless Antenna Facility- New
3.00 $
$ 13,476.98
$ (13,476.98)
0%
126
Zoning Letter
-
$
$ -
$ -
0%
127
Zoning Letter
25.00 $ 34.00
$ 657.03
$ (623.03)
5%
128
0 -
$ -
$ -
$
0%
129
Other Fees
-
$
$ -
$ -
0%
130
General Plan Update [DELETE]
$
$
$
0%
131
Records Retention [DELETE]
$
$
$
0%
132
IT/Software Update [DELETE]
$
$
$
0%
133
Base Planning Review Fee [DELETE]
$
$
$
0%
134
0 $
$
$
0%
135
Stockpiling Permit
$
$ 7,663.49
$ (7,663.49)
0%
136
Contribution to Non -Planning Fees:
$
$ -
0%
137
Temporary Sign Permit
36.00 $ 35.00
$ 216.41
$ (181.41)
16%
138
Home Occupation Permit
448.00
$ 20.00
$ 54.50
$ (34.50)
37%
139
0 -
$ -
$ -
$
0%
Wohlford Consulting Appendix 2 - Page 5 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Annual
Revenue
Surplus I
Full Cost
Activity
Total Current
Total Full Cost
(Subsidy) per
Recovery
Fee #
Fee Title
Level
Fee / Deposit
per Unit
Unit
Rate
FULL COST RECOVERY RATES (HOURLY
140
STAFF RATES:
$
$
$
00/0
Service in Excess of Standard (per hour @ staff
hourly rates and at the discretion of the
141
Director)
$
$
$
0%
Plan Checks Other Than Those Already Listed
142
(per hour @ staff hourly rates)
1.00 $
$
$
0%
Inspections Other Than Those Already Listed
143
(per hour @ staff hourly rates)
1.00 $
$
$
0%
Individual Staff Full Cost Recovery Hourly
144
Rates:
$
0%
Planning / Community Development Technician
145
(per hour)
1.00 $ 52.83
$ 203.72
$ (150.89)
26%
Community Dev Svcs Processing Sup. (per
146
hour)
1.00 $ 65.39
$ 252.26
$ (186.87)
26%
147
Assistant Planner (per hour)
1.00 $ 62.74
$ 211.26
$ (148.52)
30%
148
Associate Planner (per hour)
1.00 $ 69.35
$ 240.53
$ (171.18)
29%
149
Senior Planner (per hour)
1.00 $ 93.55
$ 287.17
$ (193.62)
33%
150
Blended Planner (per hour)
1.00 $ 65.81
$ 227.58
$ (161.77)
29%
151
Community Development Director (per hour)
1.00 $ 144.73
$ 384.61
$ (239.88)
38%
152
Administrative Assistant (per hour)
1.00 $ 48.28
$ 175.53
$ (127.25)
28%
153
Principal Management Analyst (per hour)
1.00 $ 91.97
$ 230.77
$ (138.80)
40°/u
Assistant Director of Community Development
154
(per hour)
1.00 $ -
$ 336.87
$ (336.87)
0%
Fee for services that do not fit into any other
155
category - Actual time at staff hourly rates.
1.00 $ -
$ -
$ -
0°/0
Wohlford Consulting Appendix 2 - Page 6 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
156
NON -FEE ACTIVITIES:
-
$
$
$
0%
157
Counter: Pre -Project Support (annual)
$
$ -
$
0%
158
Counter: Public Information - not recoverable
(annual)
$
$ 150,395.74
$ (150,395.74)
0%
159
CIP (annual)
$
$ 20,954.24
$ (20,954.24)
0%
160
Other City Projects (annual)
$
$ -
$
0%
161
General Plan Update (annual)
$
$
$
0%
162
Zoning Ordinance / Development Code Update
(annual)
$
$
$
0%
163
PC / Other Commission Support (annual)
$
$
$
00/0
164
Council / Constituent Referrals (annual)
$
$ 13,162.97
$ (13,162.97)
0%
165
CEQA Support - Public Projects (annual)
$
$ -
$
00/0
166
Neighborhood Planning/Meetings (annual)
$
$
$
0%
167
Non-CIP ROW (annual)
$
$
$
00/0
168
Development Impact Fee Report (annual)
$
$
$
0%
169
Pavement Management Program (annual)
$
$
$
0%
170
Long -Range Planning or Other General
Planning (annual)
$
$ 243,666.38
$ (243,666.38)
0°/u
171
Affordable Housing (annual)
$
$ 190,372.72
$ (190,372.72)
0%
172
CDBG (annual)
$
$ 6,664.24
$ (6,664.24)
0%
173
SARDA (annual)
$
$ 2,086.90
$ (2,086.90)
0%
174
Other Non -Fee Activities (annual)
$
$ 494,668.90
$ (494,668.90)
0%
175
0 $
$ -
$ -
0%
Wohlford Consulting Appendix 2 - Page 7 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
176
SUPPPORT TO OTHER DEPARTMENTS I
DIVISIONS:
$
$
$
0%
177
Support to Building (annual)
$
$ 7,125.51
$ (7,125.51)
0%
178
Support to Code Enforcement - Zoning (annual)
$
$ -
$ -
0%
179
Support to Code Enforcement - Building
(annual)
$
$ 574.36
$ (574.36)
0%
180
Support to Code Enforcement - Other (annual)
$
$ 4,551.66
$ (4,551.66)
0%
181
Support to PW Engineering (annual)
$
$ -
$ -
0%
182
Support to Police (annual)
$
$ 5,126.04
$ (5,126.04)
0%
183
Support to Fire - Operations (annual)
$
$ -
$ -
0%
184
Support to Fire- Prevention (annual)
$
$ 1,137.91
$ (1,137.91)
0%
185
Support to Fire - Haz Mat (annual)
$
$ -
$ -
0%
186
Support to All Other Departments (annual)
$
$ 17,439.58
$ (17,439.58)
0%
187
Support to Other Agencies and Jurisdictions
(annual)
$
$ 8,421.80
$ (8,421.80)
0%
188
END OF PLANNING ACTIVITIES
$
$ -
$ -
00/0
Wohlford Consulting Appendix 2 - Page 8 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
189
CONTRIBUTIONS TO INDIVIDUAL PUBLIC
WORKS FEES:
$
$
$
00/0
190
PUBLIC WORKS PLAN CHECK FEES
-
$
$
$ -
0%
191
CLEARING (per acre)
$
$
$
0%
192
GRADING:
-
$
$ -
$ -
0%
193
EARTHWORK - See "On / Off -Site
Improvements" Fees
$
$
$
0%
194
SUBDIVISION PRECISE GRADING PLAN
(excluding Custom Lots) - Base Fee
$
$ 227.58
$ (227.58)
0%
195
SUBDIVISION PRECISE GRADING PLAN
$
$ -
$
0%
196
PLAN REVISION (per sheet)
$
$
$
0%
197
4th and SUBSEQUENT REVIEW (per sheet)
$
$
$
0%
198
0 $
$
$
0%
199
ON / OFF -SITE IMPROVEMENTS PLAN
$
0%
200
ONSITE PLANCHECK: Percentage of
$
$
$ -
0%
201
Small project: Example Size = $76,000
$
$ 455.17
$ (455.17)
0%
202
Medium project: Example Size = $517,000
$
$ 910.33
$ (910.33)
0°/"
203
Large project: Example Size = $3,055,500
$
$ 1,820.68
$ (1,820.68)
0%
204
0 $
$ -
$
0%
205
OFFSITE PLANCHECK Percentage of
$
$ -
$
0%
206
Small project: Example Size = $ 102,000
$
$ 227.59
$ (227.59)
0%
207
Medium project: Example Size = $ 497,500
$
$ 455.17
$ (455.17)
00/u
208
Large project: Example Size = $4,200,000
$
$ 910.34
$ (910.34)
0%
209
0 $
$
$ -
0%
210
211
TRAFFIC CONTROL PLAN:
TRAFFIC CONTROL PLAN (per sheet)
$
$
$
$
0%
0%
212
Traffic Control Plan - 4th and each subsequent
$
$
$
0%
213
0 $
$
$
00/0
214
LEGAL DOCUMENT REVIEW
-
$
$ -
$ -
0%
215
Certificate of Correction
$
$
$
0%
216
Full General Vacation
$
$
$
0%
217
Summary Vacation
$
$
$
0%
218
Public Dedication - not related to a map
$
$
$
0%
219
Miscellaneous Legal Document
$
$
$
0%
220
Certificate Of Compliance
$
$
$
0%
221
Lot Line Adjustment
$
$ 455.17
$ (455.17)
0%
222
Parcel Merger
$
$ 854.36
$ (854.36)
0%
223
0 $
$ -
$
0%
224
0 $
$ -
$
0%
225
FINAL MAP REVIEW (Parcel and Tract Maps)
$
$
0%
226
Base Fee
$
$ 796.54
$ (796.54)
0%
227
PER SHEET (NEW STRUCTURE)
$
$ 56.90
$ (56.90)
0%
228
Monument Review (SEE NOTE)
$
$ -
$
0%
229
Amended Maps (Parcel and Tract) per sheet
$
$ -
$
0%
230
Final Map - 4th and subsequent review (per
$
$ 113.79
$ (113.79)
0%
231
0 $
$ -
$
0%
232
FEMA STUDIES
-
$
$ -
$ -
0%
Wohlford Consulting Appendix 2 - Page 9 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Unit
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
233
Conditional Letter of Map Revision (CLOMR)
$
$
$
0%
234
Letter of Map Amendment (LOMA) Review
$
$
$
00/u
235
Letter of Map Revision (LOMR) Review
$
$
$
0%
236
Flood Certification Review [NEW FEE]
$
$
$
0%
237
0 $
$
$
0%
238
239
HYDROLOG
Drainage tributary area up to 20 acres [NEW
$
$
$
$
$
0%
0%
240
Drainage tributary area over 20 acres [NEW
$
$
$
00/u
241
Hydrology Revision (NEW)
$
$
$
0%
242
243
WQMP Plan Chec
SWQPM Standard
$
$
$
$
$
$
00/0
0%
244
SWQPM Priority Development
$
$
$
0%
245
WQMP Revision [NEW FEE]
$
$
$
0%
246
0 $
$
$
0%
247
248
Traffic Impact Analysis
Minor
----
$
$
$ -
$
$ -
$
0%
0%
249
Major
$
$ 2,142.99
$ (2,142.99)
0%
250
0 $
$ -
$
0%
251
PARKS and MAINTENANCE:
-
$
$ -
$ -
0%
252
PARKS & MAINTENANCE PLANCHECK
$
$
$
0%
253
Small project: Example Size = $ 50,000
$
$ 227.58
$ (227.58)
0%
254
Medium project: Example Size = $ 200,000
$
$ 455.17
$ (455.17)
0°/u
255
Large project: Example Size = $ 750,000
$
$ 910.33
$ (910.33)
0%
256
0 $
$
$ -
0%
257
258
PUBLIC WORKS INSPECTION FEES
CLEARING (per acre)
$
$
$
$
0%
0%
259
0 $
$
$
0%
260
ON / OFFSITE IMPROVEMENTS
-
00/0
261
ONSITE INSPECTION Percentage of
$
$
$
0%
262
Small project: Example Size = $76,000
$
$
$
0%
263
Medium project: Example Size = $517,000
$
$
$
0%
264
Large project: Example Size = $3,055,500
$
$
$
0%
265
0 $
$
$
0%
266
OFFSITE INSPECTION Percentage of
$
$
$
0%
267
Small project: Example Size = $ 102,000
$
$
$
0%
268
Medium project: Example Size = $ 497,500
$
$
$
00/0
269
Large project: Example Size = $4,200,000
$
$
$
0%
270
0 $
$
$
0%
271
Overtime - $500 deposit
$
$
$
0%
272
0 $
$
$
0%
273
PARKS AND LANDSCAPE MAINTENANCE:
-
$
-
0%
274
PARKS & MAINTENANCE INSPECTION
$
$
$
0%
275
Small project: Example Size = $ 50,000
$
$
$
0%
276
Medium project: Example Size = $ 200,000
$
$
$
00/0
277
Large project: Example Size = $ 750,000
$
$
$
0%
278
0 $
$
$
00/0
Wohlford Consulting Appendix 2 - Page 10 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
279
OTHER PUBLIC WORKS FEES
-
$
$
$
0%
280
Encroachment Fees:
$
$
$
0%
281
Block Party
$
$
$
0%
282
Driveway -Residential
$
$
$
0%
283
Driveway -Commercial
$
$
$
0%
284
Excavation: Base Fee
$
$
$
0%
285
Excavation: Parallel / Street Crossing - Depth
$
$
$
0%
286
Excavation: Parallel / Street Crossing - Depth
$
$
$
0%
287
Utility Access
$
$
$
0%
288
Movie Filming
$
$
$
0%
289
Parkway Drain (maximum 2 per lot)
$
$
$
0%
290
Street Closure
$
$
$
0%
291
Utility Company - Annual Blanket
$
$
$
0%
292
Haul Route
$
$
$
0%
293
Tree trimming (CHAD: this is back)
$
$
$
0%
294
Soil Study [NEW FEE]
$
$
$
0%
295
0 $
$
$
0%
296
NPDES Fees (potential new fees):
$
$
$
0%
297
per site [No existing fee; analysis is for
$
$
$
0%
298
placed) - annual service per site [No existing
$
$
$
0%
299
Ithis fee be located in the schedule??]
$
$
$
0%
D OF LAND DEVELOPMENT FE
$
$
$
o
301
PREVENTION FEES:
-
$
$
$
0%
302
None
$
$
$
0%
303
FEES (SELECTED):
-
$
0%
304
NEW OCCUPANCIES:
$
10/0
305
(shell) - up to 5,000 sf
$
$ 339.51
$ (339.51)
0%
306
(shell) - 5,001-15,000 sf
$
$ 455.35
$ (455.35)
0%
307
(shell) - 15,001-50,000 sf
$
$ 568.96
$ (568.96)
0%
308
(shell) - each additional 1,000 sf, or portion
$
$ 22.76
$ (22.76)
0%
309
0 $
$ -
$ -
0%
310
up to 5,000 sf
$
$ 339.51
$ (339.51)
0%
311
5,001-15,000 sf
$
$ 455.17
$ (455.17)
0%
312
15,001-50,000 sf
$
$ 568.96
$ (568.96)
0%
313
each additional 1,000 sf, or portion thereof, over
$
$ 22.97
$ (22.97)
09/6
314
0 $
$ -
$ -
0%
315
NC - Warehouse - up to 5,000 sf
$
$ 283.10
$ (283.10)
0%
316
NC - Warehouse - 5,001-15,000 sf
$
$ 397.93
$ (397.93)
0%
317
NC - Warehouse - 15,001-50,000 sf
$
$ 512.06
$ (512.06)
0%
318
portion thereof, over 50,000 SF
$
$ 22.97
$ (22.97)
0%
319
0 $
$ -
$
0%
320
0 $
$ -
$
0%
321
NC - Commercial High Rise - up to 10,000 sf
$
$ 455.35
$ (455.35)
0%
322
NC - Commercial High Rise - 10,001-50,000 sf
$
$ 568.19
$ (568.19)
00/u
323
1,000 sf, or portion thereof, over 50,000 SF
$
$ 22.97
$ (22.97)
0%
Wohlford Consulting Appendix 2 - Page 11 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Unit
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
324
0 $
$
$
0%
325
0 $
$
$
0%
326
NC - Parking Structure - up to 100,000 sf
$
$ 341.38
$ (341.38)
0%
327
NC - Parking Structure - 100,001-500,000 sf
$
$ 455.35
$ (455.35)
0°/u
328
sf, or portion thereof, over 500,000 SF
$
$ 22.97
$ (22.97)
0%
329
0 $
$ -
$
0%
330
1,000 sf
$
$
$
0%
331
2,500 sf
$
$
$
0%
332
5,000 sf
$
$
$
0%
333
additional 500 sf, or portion thereof, over 5,000
$
$
$
0%
334
0 $
$
$
0%
335
up to 1,000 sf
$
$ 33.45
$ (33.45)
0%
336
1,001-2,500 sf
$
$ 45.52
$ (45.52)
0%
337
2,501-5,000 sf
$
$ 56.90
$ (56.90)
0%
338
each additional 500 sf, or portion thereof, over
$
$ -
$
0%
339
0 $
$ -
$
0%
340
NC - Apartments/Multi- Family - up to 5,000 sf
$
$ 455.35
$ (455.35)
0%
341
NC - Apartments/Multi- Family - 5,001-10,000 sf
$
$ 568.19
$ (568.19)
0%
342
sf
$
$ 625.61
$ (625.61)
0%
343
NC - Apartments/Multi- Family - each additional
$
$ 6.98
$ (6.98)
0%
344
0 $
$ -
$ -
0%
345
NC - Hotels/Motels - up to 10,000 sf
$
$ 397.93
$ (397.93)
0%
346
NC - Hotels/Motels - 10,001-50,000 sf
$
$ 512.07
$ (512.07)
0%
347
NC - Hotels/Motels - each additional 1,000 sf, or
$
$ 7.58
$ (7.58)
0%
348
0 $
$ -
$
0%
349
0 $
$ -
$
0%
350
TI - Tenant Improvements - up to 5,000 sf
$
$ 56.90
$ (56.90)
0%
351
TI - Tenant Improvements - 5,001-20,000 sf
$
$ 113.79
$ (113.79)
0%
352
TI - Tenant Improvements - each additional
$
$ 3.80
$ (3.80)
0%
353
0 $
$ -
$ -
0%
354
NC - OSHPOD Category 2 and above (Surgery
$
$ 397.93
$ (397.93)
09/6
355
NC - OSHPOD Category 2 and above (Surgery
$
$ 511.77
$ (511.77)
0%
356
NC - OSHPOD Category 2 and above (Surgery
$
$ 625.61
$ (625.61)
0%
357
NC - OSHPOD Category 2 and above (Surgery
$
$ 6.99
$ (6.99)
0%
358
0 $
$ -
$ -
0%
359
TI - OSHPOD Category 2 and above (i.e.
$
$ 56.42
$ (56.42)
0%
360
TI - OSHPOD Category 2 and above (i.e.
$
$ 78.39
$ (78.39)
0%
361
TI - OSHPOD Category 2 and above (i.e.
$
$ 113.84
$ (113.84)
0%
362
TI - OSHPOD Category 2 and above (i.e.
$
$ 6.99
$ (6.99)
0%
363
0 $
$ -
$
0%
364
NC - UTILITY BUILDING (Garage) - up to 500
$
$ -
$
0%
365
NC - UTILITY BUILDING (Garage) - 501-1,000
$
$ 121.37
$ (121.37)
0%
366
NC - UTILITY BUILDING (Garage) - 1,001-
$
$ 128.96
$ (128.96)
0%
367
NC - UTILITY BUILDING (Garage) - each
$
$ -
$
0%
368
0 $
$
$
0%
369
$
$
$
00/0
Wohlford Consulting Appendix 2 - Page 12 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
370
MISCELLANEOUS BUILDING FEES (NOW
MPE):
$
$ -
$
0%
371
Accessory Structure 0 to 500 sf
$
$ 75.78
$ (75.78)
0%
372
Accessory Structure 500 to 1000 sf
$
$ 75.85
$ (75.85)
0%
373
Accessory Structure 1001 sf +
$
$ 75.86
$ (75.86)
0%
374
Cellular Tower - free-standing
$
$ 113.79
$ (113.79)
0%
375
Cellular Tower with Equipment Shelter
$
$ 169.26
$ (169.26)
0%
376
Adding Antenna's to existing tower - first 5
$
$ 75.85
$ (75.85)
0%
377
each additional 5
$
$ 3.80
$ (3.80)
0%
378
0 $
$ -
$ -
0%
379
Carport - First 200 sf
$
$ 75.85
$ (75.85)
0%
380
Carport - each additional 200 sf
$
$ -
$
0%
381
$
$ -
$
0%
Wohlford Consulting Appendix 2 - Page 13 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
382
Photovoltaic System:
-
$
$
$
0%
383
Residential Roof Mounted
$
$ 18.89
$ (18.89)
0%
384
Residential Ground Mounted
$
$ 18.89
$ (18.89)
0%
385
Commercial Roof Mounted
$
$ 56.90
$ (56.90)
0%
386
Commercial Ground Mounted
$
$ 74.39
$ (74.39)
0%
387
$
$ -
$
0%
389
Room Addition First Story up to 300 sf
$
$ -
$ 56.90
$
$ (56.90)
o
0%
390
Each additional 100 sf
$
$ 3.80
$ (3.80)
0%
391
Room Addition Multi Story up to 300 sf
$
$ 56.90
$ (56.90)
0%
392
Each additional 100 sf
$
$ 3.80
$ (3.80)
0%
393
394
395
Signs:
Directional
$
$
$
$
$ 22.75
$ -
$ (22.75)
0%
0%
0°/u
396
Each additional Directional Sign
$
$ 3.80
$ (3.80)
0%
397
Monument
$
$ 113.79
$ (113.79)
0%
398
Each additional Monument Sign
$
$ 37.93
$ (37.93)
0%
399
Pole
$
$ -
$
0%
400
Each additional Pole Sign
$
$ -
$
0%
401
Wall Sign - Illuminated
$
$ 75.86
$ (75.86)
0%
402
Each additional Illuminated sign
$
$ 22.76
$ (22.76)
0%
403
Wall Non -Illuminated
$
$ 75.86
$ (75.86)
0%
404
Each additional Wall Sign
$
$ -
$
0%
405
END OF BUILDING FEES
$
00/0
406
CONTRIBUTIONS TO INDIVIDUAL POLICE
-
$
$
$ -
0%
407
None
$
$
$
0%
408
END OF FEE LIST
$
$
$
0%
rOTALS:
Wohlford Consulting Appendix 2 - Page 14 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
JFee
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost
Projected
Annual
Surplus /
Subsid
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit
Projected
Annual
Surplus /
Subsid
Full Cost
Recovery
Rate
Adult Business
$ -
$ -
$ -
0%
$
-
$
$ -
0%
Adult Business - Conditional Use Permit
$ 2,979
$ 4,343
$ (1,364)
69%
$
2,979
$ 4,343
$ (1,364)
69%
3 Adult Business - Employee Permit
$ 44
$ 394
$ (350)
11 %
$
44 $ 394
$ (350)
11 %
4 Adult Business - Owner Permit
$ 63
$ 510
$ (446)
12%
$
63 $ 510
$ (446)
12%
5 Annexation
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
6 Annexation / Detachment (Actual Time @ Staff
Cost Recovery Hourly Rates) [calculated cost is
the potential deposit]
$
$ 1,136
$ (1,136)
0%
$
$
$
0%
7 Pre -Annexation Agreement (Actual Time @
Staff Cost Recovery Hourly Rates) [calculated
cost is the potential deposit]
$
$ 1,073
$ (1,073)
0%
$
$
$
0%
8 Appeal
$
$ -
$ -
0%
$
$
$
0%
9 Appeal
$ 1,074
$ 32,707
$ (31,633)
3%
$
1,074
$ 32,707
$ (31,633)
3%
10 Bingo License
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
11 Bingo License
$ 250
$ 5,149
$ (4,899)
5%
$
250
$ 5,149
$ (4,899)
5%
12 0
$ -
$ -
$
00/0
$
-
$ -
$
0%
13 CEQA
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
14 Negative Declaration (Without Mitigation)
$ 6,107
$ 18,144
$ (12,036)
34%
$
6,107
$ 18,144
$ (12,036)
34%
15 Negative Declaration (With Mitigation)
$ 41,745
$ 120,182
$ (78,437)
35%
$
41,745
$ 120,182
$ (78,437)
35%
16 City Managed EIR
$ 197,376
$ 345,493
$ (148,117)
57%
$
197,376
$ 345,493
$ (148,117)
57%
17 Supplemental EIR
$ -
$ 57,881
$ (57,881)
0%
$
-
$ 57,881
$ (57,881)
0%
18 Addendum to EIR
$ -
$ 30,656
$ (30,656)
0%
$
$ 30,656
$ (30,656)
0%
19 Certificate Of Historical Appropriateness
-
$ -
$
0%
$
-
$ -
$ -
0%
20 Certificate Of Historical Appropriateness
$ 155
$ 1,086
$ (932)
14%
$
155
$ 1,086
$ (932)
14%
21 0
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
22 Conditional Use Permits
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
23 Conditional Use Permit - No Site Changes
$ 71,970
$ 180,193
$ (108,224)
40%
$
71,970
$ 180,193
$ (108,224)
40%
24 Conditional Use Permit with Development Plan
$ 8,599
$ 34,048
$ (25,449)
25%
$
8,599
$ 34,048
$ (25,449)
25%
25 Conditional Use Permit - Large Family Day
Care
$ 5,199
$ 16,150
$ (10,951)
32%
$
5,199
$ 16,150
$ (10,951)
32%
26 CUP - Modification of Existing CUP
$ -
$ 105,416
$ (105,416)
0%
$
-
$ 105,416
$ (105,416)
0%
27 CC&R Review
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
28 CC&R Review (staff)
$
$ 12,994
$ (12,994)
0%
$
$ 12,994
$ (12,994)
0%
29 Development Agreement
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
30 Development Agreement - New
$ 7,240
$ 7,105
$ 135
102%
$
7,240
$ 7,105
$ 135
102%
31 Development Agreement - Modification
$ 8,293
$ 19,930
$ (11,637)
42%
$
8,293
$ 19,930
$ (11,637)
42%
32 0
$ -
$ -
$
0%
$
-
$ -
$
0%
33 Development Plan
$ -
$ -
$
0%
$
-
$ -
$ -
0%
34 Development Plan - Larger than 100,000 SF
$ 53,058
$ 107,302
$ (54,243)
49%
$
53,058
$ 107,302
$ (54,243)
49%
35 Development Plan - 10,000-100,000 SF
$ 205,836
$ 408,181
$ (202,345)
50%
$
205,836
$ 408,181
$ (202,345)
50%
36 Development Plan -Less than 10,000 SF
$ 54,115
$ 94,649
$ (40,534)
57%
$
54,115
$ 94,649
$ (40,534)
57%
37 DIF Credit Or Reduction
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
38 DIF Credit Or Reduction
$ 1,210
$ 7,608
$ (6,398)
16%
$
1,210
$ 7,608
$ (6,398)
16%
39 0
$ -
$ -
$ -
0%
$
-
$ -
$
0%
Wohlford Consulting Appendix 2 - Page 15 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
Projected
Annual
Projected
Projected Annual
Projected
Projected
Revenue at
Projected
Annual
Full Cost
Revenue at
Annual Revenue
Annual
Full Cost
Current
Fee /
Annual Full
Surplus /
Recovery
Current Fee /
at Full Cost per
Surplus /
Recovery
Fee #
Fee Title
Deposit
Cost(Subsidy)
Rate
Deposit
Unit
(Subsidy)
Rate
40 Extension of Time
$
-
$
$ -
0%
$
-
$
$ -
0%
41 Extension Of Time
$
26,403
$ 38,567
$ (12,164)
68%
$
26,403
$
38,567
$ (12,164)
68%
42 0
$
-
$ -
$ -
0%
$
-
$
-
$ -
0%
43 Finding of Public Convenience Or Necessity
-
$
$
0%
$
$
$
0%
Finding Of Public Convenience or Necessity
44 (without DP or CUP)
$
119
$ 745
$ (626)
16%
$
119
$
745
$ (626)
16%
Finding Of Public Convenience & or Necessity
45 with DP or CUP
$
-
$ 5,149
$ (5,149)
0%
$
-
$
5,149
$ (5,149)
0%
46 General Plan Amendment
$
-
$ -
$ -
0%
$
-
$
-
$ -
0%
47 General Plan Amendment - Text Or Exhibit
$
15,324
$ 51,011
$ (35,687)
30%
$
15,324
$
51,011
$ (35,687)
30%
General Plan Amendment - Zoning & and/or
48 Land Map
$
12,009
$ 43,268
$ (31,260)
28%
$
12,009
$
43,268
$ (31,260)
28%
General Plan Amendment with Fiscal Impact
49 Analysis [DELETE]
0%
$
0%
Fiscal Impact Analysis (City Staff fee in addition
50 to external contractor cost) [NEW]
$
$ 19,188
$ (19,188)
0%
$
$
19,188
$ (19,188)
0%
51 Landscape Construction Plan
$
$ -
$ -
0%
$
$
-
$ -
0%
Landscape Construction Plan (City
administration and processing fee --in addition to
consultant review fee charged directly to
52 applicant)
$
37,536
$ 94,529
$ (56,993)
40%
$
37,536
$
94,529
$ (56,993)
40%
Wohlford Consulting Appendix 2 - Page 16 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
JFee
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost
Projected
Annual
Surplus /
Subsid
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit
Projected
Annual
Surplus /
(Subsid
Full Cost
Recovery
Rate
Maps
$ -
$
$ -
1 0%
$
$
$ -
0%
54 Certificate Of Compliance (in addition to any
Public Works fees)
$ 3,507
$ 434
$ 3,073
808%
$
3,507
$ 434
$ 3,073
808%
55 Condominium Conversion (Actual Time at Staff
Cost -Recovery Hourly Rates) [Calculated cost
is to establish a potential deposit amount.]
$ -
$ 346
$ (346)
0%
$
-
$ -
$ -
0%
56 Condominium Map
$ 15,759
$ 10,121
$ 5,638
156%
$
15,759
$ 10,121
$ 5,638
156%
57 Lot Line Adjustment (in addition to any Public
Works fees)
$ 7,093
$ 4,923
$ 2,169
144%
$
7,093
$ 4,923
$ 2,169
144%
58 Minor Change To Approved Tentative Map
$ 2,686
$ 5,248
$ (2,562)
51%
$
2,686
$ 5,248
$ (2,562)
51%
lic
$
$
60 Phasin7PIan For Tentative Map
$ 4,803
$ 6,624
$ (1,821)
73%
$
4,803
$ 6,624
$ (1,821)
73%
61 Reverso Acreage
$ -
$ 157
$ (157)
0%
$
-
$ -
$ -
0%
62 TPM Cercial Industrial Standard
$ 15,035
$ 25,673
$ (10,638)
59%
$
15,035
$ 25,673
$ (10,638)
59%
63 TPM Cercial Industrial with Waiver
$ 506
$ 1,043
$ (537)
48%
$
506
$ 1,043
$ (537)
48%
64 TPM Rntial Standard
$ 10,789
$ 31,416
$ (20,627)
34%
$
10,789
$ 31,416
$ (20,627)
349/6
65 TPM Residential wth Waiver- Final Map
$ -
$ 127
$ (127)
0%
$
-
$ -
$ -
0%
66 TPM Revised
$ 940
$ 1,991
$ (1,051)
47%
$
940
$ 1,991
$ (1,051)
47%
67 TPM Vesting
$ 946
$ 3,114
$ (2,168)
30%
$
946
$ 3,114
$ (2,168)
30%
68 0
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
69 TTM Standard - 5-34 Lots/Units (flat fee)
$ 19,223
$ 24,881
$ (5,657)
77%
$
19,223
$ 24,881
$ (5,657)
77%
70 TTM Standard - Additional Unit Fee per lot
above 34 lots
$ -
$ 84
$ (84)
0%
$
-
$ 84
$ (84)
0%
71 TTM Standard Revised Map
$ 4,011
$ 5,868
$ (1,857)
68%
$
4,011
$ 5,868
$ (1,857)
68%
72 0
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
73 TTM Vesting 5 - 34 lots/units (flat fee)
$ 8,073
$ 9,452
$ (1,379)
85%
$
8,073
$ 9,452
$ (1,379)
85%
74 TTM Vesting - Additional Unit Fee per lot above
34 lots
$ -
$ 84
$ (84)
0%
6J $
-
$ 84
$ (84)
0%
75 TTM Vesting Revised Map
$ 2,258
$ 2,569
$ (311)
88%
E $
2,258
$ 2,569
$ (311)
88%
76 0
$ -
$ -
$ -
0%
Es
-
$ -
$ -
0%
Wohlford Consulting Appendix 2 - Page 17 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit
Projected
Annual
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
77 Massage Permits
$ -
$
$ -
0%
$
-
$
$ -
0%
78 Massage Establishment Permit
$ 10,608
$ 34,142
$ (23,534)
31%
$
10,608
$ 34,142
$ (23,534)
31%
79 Massage Establishment Permit Renewal
$ 8,275
$ 43,351
$ (35,076)
19%
$
8,275
$ 43,351
$ (35,076)
19%
80 Massage Technician License [This service is
now a state responsibility.]
$ -
$
0%
$
-
$ -
$
0%
81 0
$
$ -
$
0%
$
$
$
0%
82 Minor Exception
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
83 Minor Exception - General
$ 2,788
$ 17,486
$ (14,698)
16%
$
2,788
$ 17,486
$ (14,698)
16%
84 Minor Exception - Individual Homeowner
$ 522
$ 3,996
$ (3,474)
13%
$
522
$ 3,996
$ (3,474)
13%
85 Modifications
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
86 Major Modification
$ 49,870
$ 91,801
$ (41,931)
54%
$
49,870
$ 91,801
$ (41,931)
54%
87 Minor Modification
$ 57,534
$ 100,941
$ (43,406)
57%
$
57,534
$ 100,941
$ (43,406)
57%
88 Minor Modification - Plan Review Only
$ 19,890
$ 308,501
$ (288,611)
6%
$
19,890
$ 308,501
$ (288,611)
6%
89 Minor Modification - Plan Review Only
(Individual Homeowner)
$ 10,829
$ 111,275
$ (100,446)
10%
$
10,829
$ 111,275
$ (100,446)
10%
90 Municipal Code Amendment
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
91 Municipal Code Amendment
$ 1,601
$ 7,926
$ (6,324)
20%
$
1,601
$ 7,926
$ (6,324)
20%
92 Planned Development Overlay
$ -
$ -
$ -
00/0
$
-
$ -
$ -
0%
93 Planned Development Overlay
$ 42,204
$ 57,258
$ (15,054)
74%
$
42,204
$ 57,258
$ (15,054)
74%
94 Planned Development Overlay - Amendment
$ -
$ 6,730
$ (6,730)
0%
$
-
$ 6,730
$ (6,730)
0%
WO
KeSidentialrac ome rodu ewew
$ -
I -
-
0%
$
-
-
$ -
o
96 Residential Tract Home Product Review
$ 41,682
$ 70,406
$ (28,724)
59%
$
41,682
$ 70,406
$ (28,724)
59%
97 Accessory Dwelling Unit
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
98 Accessory Dwelling Unit
$ 2,055
$ 8,454
$ (6,399)
24%
$
2,055
$ 8,454
$ (6,399)
24%
99 0
$ -
$ -
$
0%
$
-
$ -
$
0%
100
Signage
$
$ -
$
0%
$
-
$ -
$
0%
101
Sign Program Amendment
$ -
$ 45,906
$ (45,906)
0%
$
-
$ 45,906
$ (45,906)
0%
102
Sign Program - New
$ 17,345
$ 68,075
$ (50,730)
25%
$
17,345
$ 68,075
$ (50,730)
25%
103
0 $ -
$ -
$
0%
$
-
$ -
$
0%
104
Specific Plan
$ -
$
0%
$
-
$ -
$
0%
105
Specific Plan - New
$ 11,471
$ 15,780
$ (4,310)
73%
$
11,471
$ 15,780
$ (4,310)
73%
106
Specific Plan Amendment - Major
$ 22,763
$ 40,216
$ (17,452)
57%
$
22,763
$ 40,216
$ (17,452)
57%
107
Specific Plan Amendment - Minor
$ 15,885
$ 43,363
$ (27,478)
37%
$
15,885
$ 43,363
$ (27,478)
37%
108
0 $ -
$ -
$
0%
$
-
$ -
$
0%
109
Temporary Use Permits
$
$ -
$ -
0 0
$
-
$ -
$ -
0%
110
Temporary Use Permit - Minor Regular
$ 1,500
$ 18,513
$ (17,013)
8%
$
1,500
$ 18,513
$ (17,013)
8%
111
Temporary Use Permit - Major Regular
$ 9,600
$ 105,355
$ (95,755)
9%
$
9,600
$ 105,355
$ (95,755)
9%
112
Temporary Use Permit - Major Non Profit
$ 600
$ 18,660
$ (18,060)
3%
$
600
$ 18,660
$ (18,060)
3%
113
Temporary Use Permit - Minor Non Profit
$ 150
$ 3,702
$ (3,552)
4%
$
150
$ 3,702
$ (3,552)
4%
114
Temporary Use Permit - Model Home Complex
$ 34
$ 9,530
$ (9,496)
0%
$
34 $ 9,530
$ (9,496)
0%
115
Temporary Use Permit - Sales / Construction
Trailer
$ 51
$ 13,094
$ (13,043)
0%
$
51 $ 13,094
$ (13,043)
0%
116
0 $
$ -
$
0%
$
$ -
$
0%
117
Variance
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
118
Variance
$ 520
$ 2,597
$ (2,077)
20%
$
520
$ 2,597
$ (2,077)
20%
Wohlford Consulting Appendix 2 - Page 18 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
JFee
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost
Projected
Annual
Surplus /
Subsid
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit
Projected
Annual
Surplus /
(Subsid
Full Cost
Recovery
Rate
Vendors License
Vendors License
0 $
$
$ -
0%
$
-
$
$ -
0%
$ 132
$ 3,336
$ (3,204)
4%
$ 132
$ 3,336
$ (3,204)
4%
121
$ -
$ -
$
0%
$ -
$ -
$
0%
122
Wireless Antenna Facility A
$ -
$
0%
$
$ -
$
0%
123
Wireless Antenna Facility -Administrative
Review
$
$ 27,635
$ (27,635)
0%
$
$ 27,635
$ (27,635)
0%
124
Wireless Antenna Facility - Revision with Public
Hearing
$
$ 19,990
$ (19,990)
0%
$
$ 19,990
$ (19,990)
0%
125
Wireless Antenna Facility - New
$
$ 40,431
$ (40,431)
0%
$
$ 40,431
$ (40,431)
0%
126
Zoning Letter
$
$ -
$ -
0%
$
$ -
$ -
0%
127
Zoning Letter
$ 850
$ 16,426
$ (15,576)
5%
$
850
$ 16,426
$ (15,576)
5%
128
0 $ -
$ -
$
0%
$
-
$ -
$
0%
129
Other Fees
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
130
General Plan Update [DELETE]
$
$
$
0%
$
$
$
0%
131
Records Retention [DELETE]
$
$
$
0%
$
$
$
0%
132
IT/Software Update [DELETE]
$
$
$
0%
$
$
$
0%
133
Base Planning Review Fee [DELETE]
$
$
$
0%
$
$
$
0%
134
0 $
$
$
0%
$
$
$
0%
135
Stockpiling Permit
$
$ 8
$ (8)
0%
$
$
$
0%
136
Contribution to Non -Planning Fees:
$
$
$
0%
$
$
0%
137
Temporary Sign Permit
$ 1,260
$ 7,791
$ (61531)
16%
$
1,260
$ 7,791
$ (6,531)
16%
138
Home Occupation Permit
$ 8,960
$ 24,416
$ (15,456)
37%
$
8,960
$ 24,416
$ (15,456)
37%
139
0 $ -
$ -
$
0%
$
-
$ -
$
0%
Wohlford Consulting Appendix 2 - Page 19 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
Projected
Annual
Projected
Projected Annual
Projected
Projected
Revenue at
Projected
Annual
Full Cost
Revenue at
Annual Revenue
Annual
Full Cost
JFee
Current Fee /
Annual Full
Surplus /
Recovery
Current Fee /
at Full Cost per
Surplus /
Recovery
FeeTitle
Deposit
Cost
Subsid
Rate
Deposit
Unit
Subsid
Rate
FULL COST RECOVERY RATES (HOURLY
STAFF RATES:
$
$
$
0%
$
$
$
0%
Service in Excess of Standard (per hour @ staff
hourly rates and at the discretion of the
141
Director)
$
$
$
0%
$
$
$
0%
Plan Checks Other Than Those Already Listed
142
(per hour @ staff hourly rates)
$
$
$
0%
$
$
$
0%
Inspections Other Than Those Already Listed
143
(per hour @ staff hourly rates)
$
$
$
0%
$
$
$
0%
Individual Staff Full Cost Recovery Hourly
144
Rates:
$
$
$ do
0%
$
$
Planning / Community Development Technician
145
(per hour)
$ 53
$ 204
$ (151)
26%
$
53 $ 204
$ (151)
26%
Community Dev Svcs Processing Sup. (per
146
hour)
$ 65
$ 252
$ (187)
26%
$
65 $ 252
$ (187)
26%
147
JAssistant Planner (per hour)
$ 63
$ 211
$ (149)
30%
$
63 $ 211
$ (149)
30%
148
JAssociate Planner (per hour)
$ 69
$ 241
$ (171)
29%
$
69 $ 241
$ (171)
29%
149
Senior Planner (per hour)
$ 94
$ 287
$ (194)
33%
$
94 $ 287
$ (194)
33%
150
Blended Planner (per hour)
$ 66
$ 228
$ (162)
29%
$
66 $ 228
$ (162)
29%
151
Community Development Director (per hour)
$ 145
$ 385
$ (240)
38%
$
145
$ 385
$ (240)
38%
152
Administrative Assistant (per hour)
$ 48
$ 176
$ (127)
28%
$
48 $ 176
$ (127)
28%
153
Principal Management Analyst (per hour)
$ 92
$ 231
$ (139)
40%
$
92 $ 231
$ (139)
40%
Assistant Director of Community Development
154
(per hour)
$
$ 337
$ (337)
0%
$
$ 337
$ (337)
0%
Fee for services that do not fit into any other
155
category - Actual time at staff hourly rates.
$
$ -
$ -
0%
$
$ -
$ -
00/0
Wohlford Consulting Appendix 2 - Page 20 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit
Projected
Annual
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
156
NON -FEE ACTIVITIES:
$
$
$
0%
$
$
$ -
0%
157
Counter: Pre -Project Support (annual)
$
$ -
$
0%
$
$
$
0%
158
Counter: Public Information - not recoverable
(annual)
$
$ 150,396
$ (150,396)
0%
$
$
$
0%
159
CIP (annual)
$
$ 20,954
$ (20,954)
0%
$
$
$
0%
160
Other City Projects (annual)
$
$ -
$
0%
$
$
$
0%
161
General Plan Update (annual)
$
$
$
0%
$
$
$
0%
162
Zoning Ordinance / Development Code Update
(annual)
$
$
$
0%
$
$
$
0%
163
PC / Other Commission Support (annual)
$
$
$
0%
$
$
$
0%
164
Council / Constituent Referrals (annual)
$
$ 13,163
$ (13,163)
0%
$
$
$
0%
165
CEQA Support - Public Projects (annual)
$
$ -
$
0%
$
$
$
0%
166
Neighborhood Planning/Meetings (annual)
$
$
$
0%
$
$
$
0%
167
Non-CIP ROW (annual)
$
$
$
0%
$
$
$
0%
168
Development Impact Fee Report (annual)
$
$
$
0%
$
$
$
0%
169
Pavement Management Program (annual)
$
$
$
0%
$
$
$
0%
170
Long -Range Planning or Other General
Planning (annual)
$
$ 243,666
$ (243,666)
0%
$
$
$
0%
171
Affordable Housing (annual)
$
$ 190,373
$ (190,373)
0%
$
$
$
0%
172
CDBG (annual)
$
$ 6,664
$ (6,664)
0%
$
$
$
0%
173
SARDA (annual)
$
$ 2,087
$ (2,087)
0%
$
$
$
0%
174
Other Non -Fee Activities (annual)
$
$ 494,669
$ (494,669)
0%
$
$
$
0%
175
0 $
$ -
$ -
0%
$
$
$
0%
Wohlford Consulting Appendix 2 - Page 21 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
JFee
FeeTitle
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost
Projected
Annual
Surplus /
Subsid
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit
Projected
Annual
Surplus /
Subsid
Full Cost
Recovery
Rate
SUPPPORT TO OTHER DEPARTMENTSDIVISIONS:
$
$ -
$ -
0%
$
$
$
00/0
177
Support to Building (annual)
$
$ 7,126
$ (7,126)
0%
$
$
$
0%
178
Support to Code Enforcement - Zoning (annual)
$
$ -
$ -
0%
$
$
$
0%
179
Support to Code Enforcement - Building
(annual)
$
$ 574
$ (574)
0%
$
$
$
0%
180
Support to Code Enforcement - Other (annual)
$
$ 4,552
$ (4,552)
0%
$
$
$
0%
181
Support to PW Engineering (annual)
$
$ -
$ -
0%
$
$
$
0%
182
Support to Police (annual)
$
$ 5,126
$ (5,126)
0%
$
$
$
0%
183
Support to Fire - Operations (annual)
$
$ -
$ -
0%
$
$
$
0%
184
Support to Fire - Prevention (annual)
$
$ 1,138
$ (1,138)
0%
$
$
$
0%
185
Support to Fire - Haz Mat (annual)
$
$ -
$ -
0%
$
$
$
0%
186
Support to All Other Departments (annual)
$
$ 17,440
$ (17,440)
0%
$
$
$
0%
187
Support to Other Agencies and Jurisdictions
(annual)
$
$ 8,422
$ (8,422)
0%
$
$
$
0%
188
END OF PLANNING ACTIVITIES
$
$
0%
$
-
$
00/u
Wohlford Consulting Appendix 2 - Page 22 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
JFee
FeeTitle
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost
Projected
Annual
Surplus /
Subsid
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit
Projected
Annual
Surplus /
Subsid
Full Cost
Recovery
Rate
CONTRIBUTIONS TO INDIVIDUAL PUBLIC
WORKS FEES:
190
PUBLIC WORKS PLAN CHECK FEES
191
CLEARING (per acre)
192
GRADING:
193
EARTHWORK - See "On / Off -Site
Improvements" Fees
194
SUBDIVISION PRECISE GRADING PLAN
(excluding Custom Lots) - Base Fee
195
SUBDIVISION PRECISE GRADING PLAN
196
PLAN REVISION (per sheet)
197
4th and SUBSEQUENT REVIEW (per sheet)
198
0 19
ON / F-SITE IMPROVEMENTS PLAN
200
ONSITE PLANCHECK: Percentage of
201
Small project: Example Size = $76,000
202
Medium project: Example Size = $517,000
203
Large project: Example Size = $3,055,500
204
0 205
OFFSITE PLANCHECK Percentage of
206
Small project: Example Size = $ 102,000
207
Medium project: Example Size = $ 497,500
208
Large project: Example Size = $4,200,000
209
0 210
211
TRAFFIC CONTROL PLAN:
TRAFFIC CONTROL PLAN (per sheet)
212
Traffic Control Plan - 4th and each subsequent
213
0 214
LEGAL DOCUMENT REVIEW
215
Certificate of Correction
216
Full General Vacation
217
Summary Vacation
218
Public Dedication - not related to a map
219
Miscellaneous Legal Document
220
Certificate Of Compliance
221
Lot Line Adjustment
222
Parcel Merger
223
0 224
0 225
FINAL MAP REVIEW (Parcel and Tract Maps)
226
Base Fee
227
PER SHEET (NEW STRUCTURE)
228
Monument Review (SEE NOTE)
229
Amended Maps (Parcel and Tract) per sheet
230
Final Map - 4th and subsequent review (per
231
0 232
FEMA STUDIES
Wohlford Consulting Appendix 2 - Page 23 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
JFee
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost
Projected
Annual
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit
Projected
Annual
Surplus /
Subsid
Full Cost
Recovery
Rate
Conditional Letter of Map Revision (CLOMR)
Letter of Map Amendment (LOMA) Review
235
Letter of Map Revision (LOMR) Review
236
Flood Certification Review [NEW FEE]
237
0 238
239
HYDROLOG
Drainage tributary area up to 20 acres [NEW
240
Drainage tributary area over 20 acres [NEW
241
Hydrology Revision (NEW)
242
243
WQMP Plan Chec
SWQPM Standard
244
SWQPM Priority Development
245
WQMP Revision [NEW FEE]
246
0 247
248
Traffic Impact Analysis:
Minor
249
Major
250
0 251
PARKS and MAINTENANCE:
252
PARKS & MAINTENANCE PLANCHECK
253
Small project: Example Size = $ 50,000
254
Medium project: Example Size = $ 200,000
255
Large project: Example Size = $ 750,000
256
0 257
PUBLIC WORKS INSPECTION FEESSREFF
258
CLEARING (per acre)
259
0 260
ON / OFFSITE IMPROVEMENTS adk
261
ONSITE INSPECTION Percentage of
262
Small project: Example Size = $76,000
263
Medium project: Example Size = $517,000
264
Large project: Example Size = $3,055,500
265
0 266
OFFSITE INSPECTION Percentage of
267
Small project: Example Size = $ 102,000
268
Medium project: Example Size = $ 497,500
269
Large project: Example Size = $4,200,000
270
0 271
Overtime - $500 deposit
272
0 273
PARKS AND LANDSCAPE MAINTENANCE:
274
PARKS & MAINTENANCE INSPECTION
275
Small project: Example Size = $ 50,000
276
Medium project: Example Size = $ 200,000
277
Large project: Example Size = $ 750,000
278
0 Wohlford Consulting Appendix 2 - Page 24 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
279
OTHER PUBLIC WORKS FEES
280
Encroachment Fees:
281
Block Party
282
Driveway -Residential
283
Driveway -Commercial
284
Excavation: Base Fee
285
Excavation: Parallel / Street Crossing - Depth
286
Excavation: Parallel / Street Crossing - Depth
287
Utility Access
288
Movie Filming
289
Parkway Drain (maximum 2 per lot)
290
Street Closure
291
Utility Company - Annual Blanket
292
Haul Route
293
Tree trimming (CHAD: this is back)
294
Soil Study [NEW FEE]
295
0 296
NPDES Fees (potential new fees):
297
per site [No existing fee; analysis is for
298
placed) - annual service per site [No existing
299
Ithis fee be located in the schedule??]
OF LAND DEVELOPMENT FE
301
PREVENTION FEES:
302
None
303
FEES (SELECTED):
304
NEW OCCUPANCIES:
305
(shell) - up to 5,000 sf
306
(shell) - 5,001-15,000 sf
307
(shell) - 15,001-50,000 sf
308
(shell) - each additional 1,000 sf, or portion
309
0 310
up to 5,000 sf
311
5,001-15,000 sf
312
15,001-50,000 sf
313
each additional 1,000 sf, or portion thereof, over
314
0 315
NC - Warehouse - up to 5,000 sf
316
NC - Warehouse - 5,001-15,000 sf
317
NC - Warehouse - 15,001-50,000 sf
318
portion thereof, over 50,000 SF
319
0 320
0 321
NC - Commercial High Rise - up to 10,000 sf
322
NC - Commercial High Rise - 10,001-50,000 sf
323
1,000 sf, or portion thereof, over 50,000 SF
Wohlford Consulting Appendix 2 - Page 25 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost
Projected
Annual
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
324
0 325
0 326
NC - Parking Structure - up to 100,000 sf
327
NC - Parking Structure - 100,001-500,000 sf
328
sf, or portion thereof, over 500,000 SF
329
0 330
1,000 sf
331
2,500 sf
332
5,000 sf
333
additional 500 sf, or portion thereof, over 5,000
334
0 335
up to 1,000 sf
336
1,001-2,500 sf
337
2,501-5,000 sf
338
each additional 500 sf, or portion thereof, over
339
0 340
NC - Apartments/Multi- Family - up to 5,000 sf
341
NC - Apartments/Multi- Family - 5,001-10,000 sf
342
sf
343
NC - Apartments/Multi- Family - each additional
344
0 345
NC - Hotels/Motels - up to 10,000 sf
346
NC - Hotels/Motels - 10,001-50,000 sf
347
NC - Hotels/Motels - each additional 1,000 sf, or
348
0 349
0 350
TI - Tenant Improvements - up to 5,000 sf
351
TI - Tenant Improvements - 5,001-20,000 sf
352
TI - Tenant Improvements - each additional
353
0 354
NC - OSHPOD Category 2 and above (Surgery
355
NC - OSHPOD Category 2 and above (Surgery
356
NC - OSHPOD Category 2 and above (Surgery
357
NC - OSHPOD Category 2 and above (Surgery
358
0 359
TI - OSHPOD Category 2 and above (i.e.
360
TI - OSHPOD Category 2 and above (i.e.
361
TI - OSHPOD Category 2 and above (i.e.
362
TI - OSHPOD Category 2 and above (i.e.
363
0 364
NC - UTILITY BUILDING (Garage) - up to 500
365
NC - UTILITY BUILDING (Garage) - 501-1,000
366
NC - UTILITY BUILDING (Garage) - 1,001-
367
NC - UTILITY BUILDING (Garage) - each
368
0 369
Potential Revenue Results (Fee Services Only)
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Wohlford Consulting Appendix 2 - Page 26 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
370
MISCELLANEOUS BUILDING FEES (NOW
MPE):
371
Accessory Structure 0 to 500 sf
372
Accessory Structure 500 to 1000 sf
373
Accessory Structure 1001 sf +
374
Cellular Tower - free-standing
375
Cellular Tower with Equipment Shelter
376
Adding Antenna's to existing tower - first 5
377
each additional 5
378
0 379
Carport - First 200 sf
380
Carport - each additional 200 sf
381
Wohlford Consulting Appendix 2 - Page 27 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
PLANNING
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
382
Photovoltaic System:
383
Residential Roof Mounted
384
Residential Ground Mounted
385
Commercial Roof Mounted
386
Commercial Ground Mounted
387
DI
389
Room Addition First Story up to 300 sf
390
Each additional 100 sf
391
Room Addition Multi Story up to 300 sf
392
Each additional 100 sf
393
394
Signs:
395
Directional
396
Each additional Directional Sign
397
Monument
398
Each additional Monument Sign
399
Pole
400
Each additional Pole Sign
401
Wall Sign - Illuminated
402
Each additional Illuminated sign
403
Wall Non -Illuminated
404
Each additional Wall Sign
405
END OF BUILDING FEES
406
CONTRIBUTIONS TO INDIVIDUAL POLICE
407
None
JAL
408
END OF FEE LIST
$
$
$
0%
TOTALS:
$ 1,192,002
$ 4,554,927
1 $(3,362,925)126%
Revenue Totals
Potential Revenue Results (Fee Services Only)
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
$
$
0%
$ 1,192,002
$ 3,385,731
$ 2,193,729
35%
Revenue Totals
Wohlford Consulting Appendix 2 - Page 28 of 28 September 28, 2023
2023 Full Cost of Services (User Fee) Study
FINAL REPORT
APPENDIX 3:
COST RESULTS FOR LAND DEVELOPMENT
The follow pages contain a summary of the results from the analysis of Land Development Division fee services.
Wohlford Consulting Appendix 3 - Final Results September 27, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
1 PUBLIC WORKS PLAN CHECK FEES
-
$
$
$
0%
2 CLEARING (per acre)
20.00 $ 216.70
$ 348.59
$ (131.89)
62%
3 GRADING:
-
$
$ -
$ -
0%
4 EARTHWORK - See "On / Off -Site
Improvements" Fees
-
$ -
$ -
$
0%
5 SUBDIVISION PRECISE GRADING PLAN
(excluding Custom Lots) - Base Fee
2.00 $ 348.70
$ 1,717.42
$ (1,368.72)
20%
6 SUBDIVISION PRECISE GRADING PLAN
(excluding Custom Lots) - Per Lot
110.00
$ 41.80
$ 582.45
$ (540.65)
7%
7 PLAN REVISION (per sheet)
89.00 $ 342.00
$ 400.72
$ (58.72)
85%
8 4th and SUBSEQUENT REVIEW (per sheet)
102.00
$ 132.00
$ 167.87
$ (35.87)
79°/"
9 0
-
$ -
$ -
$ -
0%
10 ON / OFF -SITE IMPROVEMENTS PLAN
CHECK:
$
$ -
REEWF-
$ -
0%
11 ONSITE PLANCHECK: Percentage of
Engineer's Construction Security Worksheet:
-
$ -
$ 230.50
$ (230.50)
0%
12 Small project: Example Size = $76,000
12.00 $ 3,307.73
$ 7,199.44
$ (3,891.71)
46%
13 Medium project: Example Size = $517,000
5.00 $ 20,556.47
$ 24,555.01
$ (3,998.54)
84"/"
14 Large project: Example Size = $3,055,500
1.00 $ 119,430.39
$ 140,220.97
$ (20,790.58)
85%
15 0
-
$ -
$ -
$ -
0%
16 OFFSITE PLANCHECK Percentage of
Engineer's Construction Security Worksheet:
-
$ -
$ 230.50
$ (230.50)
0%
17 Small project: Example Size = $ 102,000
6.00 $ 4,392.33
$ 6,753.39
$ (2,361.06)
65%
18 Medium project: Example Size = $ 497,500
4.00 $ 19,796.95
$ 18,225.57
$ 1,571.38
109%
19 Large project: Example Size = $4,200,000
1.00 $ 164,008.36
$ 159,474.07
$ 4,534.29
103%
20 0
-
$ -
$ -
$ -
0%
2 TRAFFIC CONTROL PLAN:
TRAFFIC CONTROL PLAN (per sheet)
-
$ -
$
$ (429.48)
0%
22 351.00
$ 81.00
$ 510.48
16%
23 Traffic Control Plan - 4th and each subsequent
review [NEW CATEGORY]
1.00 $ -
$ 128.33
$ (128.33)
0%
24 0
-
$ -
$ -
$ -
0%
25 26
LEGAL DOCUMENT REVIEW
Certificate of Correction
0.10 $ 922.00
$ 2,894.55
$ (1,972.55)
0%
32%
27 Full General Vacation
0.10 $ 4,967.60
$ 4,341.52
$ 626.08
114%
28 Summary Vacation
0.10 $ 2,002.00
$ 3,471.86
$ (1,469.86)
58%
29 Public Dedication - not related to a map
6.00 $ 1,452.00
$ 3,044.15
$ (1,592.15)
48%
30 Miscellaneous Legal Document
0.10 $ 485.10
$ 2,317.45
$ (1,832.35)
21%
31 Certificate Of Compliance
2.00 $ 1,668.25
$ 2,497.20
$ (828.95)
67%
32 Lot Line Adjustment
4.00 $ 1,142.13
$ 3,005.78
$ (1,863.65)
38%
33 Parcel Merger
2.00 $ 2,014.60
$ 3,894.90
$ (1,880.30)
52%
34 0
-
$ -
$ -
$
0%
35 0
$ -
$ -
$
00/0
Wohlford Consulting Appendix 3a - Page 1 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
36 FINAL MAP REVIEW (Parcel and Tract Maps)
-
$ -
$ -
$
0%
37 Base Fee
5.00 $ 8,064.00
$ 10,162.52
$ (2,098.52)
79%
38 PER SHEET (NEW STRUCTURE)
19.00 $ -
$ 1,575.67
$ (1,575.67)
0%
39 Monument Review (SEE NOTE)
5.00 $ 411.00
$ 4,805.14
$ (4,394.14)
9%
40 Amended Maps (Parcel and Tract) per sheet
1.00 $ 592.90
$ 1,505.28
$ (912.38)
39%
41 Final Map - 4th and subsequent review (per
sheet)
28.00 $ 286.00
$ 707.09
$ (421.09)
40%
42 0
-
$ -
$ -
$ -
0%
43 FEMA STUDIES
WE,
$
$
0%
44 Conditional Letter of Map Revision (CLOMR)
Review
0.10 $ 6,865.10
$ 3,805.50
$ 3,059.60
180%
45 Letter of Map Amendment (LOMA) Review
0.10 $ 2,390.30
$ 3,805.50
$ (1,415.20)
63%
46 Letter of Map Revision (LOMR) Review
0.10 $ 2,194.50
$ 3,513.15
$ (1,318.65)
62%
47 Flood Certification Review [NEW FEE]
1.00 $ -
$ 2,426.73
$ (2,426.73)
0%
48 0
-
$ -
$ -
$
0%
49 50
HYDROLOG
Drainage tributary area up to 20 acres [NEW
CATEGORY]
10.00 $
$ 2,829.00
$ -
$ 3,662.32
$ (833.32)
0%
779/6
51 Drainage tributary area over 20 acres [NEW
CATEGORY]
3.00 $ 4,125.00
$ 5,693.09
$ (1,568.09)
72%
52 Hydrology Revision (NEW)
1.00 $ -
$ 1,953.89
$ (1,953.89)
0%
53 54
WQMP Plan Check:
SWQPM Standard
2.00 $ 1,653.87
$ -
$ 1,504.98
-
$ 148.89
0%
110%
55 SWQPM Priority Development
17.00 $ 2,742.06
$ 3,479.99
$ (737.93)
79%
56 WQMP Revision [NEW FEE]
1.00 $
$ 3,949.58
$ (3,949.58)
0%
57 0
-
$
$ -
$ -
0%
58 59
jTraffic Impact Analysi
Minor
1.00 $
$ 3,309.00
$
$ 2,310.67
-
$ 998.33
o
143%
60 Major
1.00 $ 827.00
$ 6,764.19
$ (5,937.19)
12%
61 0
-
$ -
$ -
$
0%
62 PARKS and MAINTENANCE:
$
0%
63 PARKS & MAINTENANCE PLANCHECK
Percentage of Engineer's Construction Security
Worksheet:
$ -
$ -
$ -
0%
64 Small project: Example Size = $ 50,000
2.00 $ 6,111.72
$ 6,770.21
$ (658.49)
90%
65 Medium project: Example Size = $ 200,000
2.00 $ 9,550.48
$ 13,806.63
$ (4,256.15)
69%
66 Large project: Example Size = $ 750,000
0.50 $ 21,229.41
$ 24,315.98
$ (3,086.57)
87%
67 0
-
$ -
$ -
$
0%
68 PUBLIC WORKS INSPECTION FEES
-
$ -
$ -
$
0%
69 CLEARING (per acre)
20.00 $ 166.00
$ 119.31
$ 46.69
139%
70 0
-
$ -
$ -
$ -
00/0
Wohlford Consulting Appendix 3a - Page 2 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
71 ON / OFF -SITE IMPROVEMENTS
INSPECTION:
$
$
$
0%
72 ONSITE INSPECTION Percentage of
Engineer's Construction Security Worksheet:
-
$ -
$
$
0%
73 Small project: Example Size = $76,000
12.00 $ 3,307.73
$ 7,175.36
$ (3,867.63)
46%
74 Medium project: Example Size = $517,000
10.00 $ 20,556.47
$ 16,368.51
$ 4,187.96
1260/6
75 Large project: Example Size = $3,055,500
2.00 $ 119,430.39
$ 90,972.22
$ 28,458.17
1310/u
76 0
-
$ -
$ -
$ -
0%
77 OFFSITE INSPECTION Percentage of
Engineer's Construction Security Worksheet:
-
$ -
$ -
$ -
0%
78 Small project: Example Size = $ 102,000
6.00 $ 4,392.33
$ 5,171.00
$ (778.67)
85%
79 Medium project: Example Size = $ 497,500
3.00 $ 19,796.95
$ 21,301.67
$ (1,504.72)
93%
80 Large project: Example Size = $4,200,000
2.00 $ 164,008.36
$ 120,993.79
$ 43,014.57
136%
81 0
-
$ -
$ -
$ -
0%
82 Overtime - $500 deposit
1.00 $
$
$
0%
83 0
-
$
$
$
0%
84 PARKS AND LANDSCAPE MAINTENANCE:
$
0%
85 PARKS & MAINTENANCE INSPECTION
Percentage of Engineer's Construction Security
Worksheet:
-
$
$
$
0%
86 Small project: Example Size = $ 50,000
2.00 $ 3,451.55
$ 12,468.32
$ (9,016.77)
28%
87 Medium project: Example Size = $ 200,000
2.00 $ 5,539.25
$ 34,559.63
$ (29,020.38)
16%
88 Large project: Example Size = $ 750,000
0.50 $ 8,576.13
$ 62,321.50
$ (53,745.37)
14%
89 90
91 92
0 OTHER PUBLIC WORKS FEE
Encroachment Fees:
Block Party
-
0.05 $ -
$ 37.00
$
$ 118.98
$
$ (81.98)
0%
00/0
0%
31 %
93 Driveway - Residential
9.00 $ 105.00
$ 487.94
$ (382.94)
22%
94 Driveway -Commercial
2.00 $ 78.00
$ 487.95
$ (409.95)
16%
95 Excavation: Base Fee
120.00
$ 276.00
$ 1,687.39
$ (1,411.39)
16%
96 Excavation: Parallel / Street Crossing - Depth
up to 5 feet - per 100 If (in addition to the
Excavation Base Fee)
320.00
$ 276.00
$ 447.32
$ (171.32)
62%
97 Excavation: Parallel / Street Crossing - Depth
greater than 5 feet - per 100 If (in addition to the
Excavation Base Fee)
0.10 $ 276.00
$ 1,108.90
$ (832.90)
25%
98 Utility Access
189.00
$ 35.00
$ 562.37
$ (527.37)
6%
99 Movie Filming
0.05 $ 1,233.00
$ 821.84
$ 411.16
1500/6
100
Parkway Drain (maximum 2 per lot)
6.00 $ 78.00
$ 226.68
$ (148.68)
34%
101
Street Closure
1.00 $ 166.00
$ 718.94
$ (552.94)
23%
102
UtilityCompany- AnnualBlanket
7.00 $ 479.00
$ 3,609.69
$ (3,130.69)
13%
103
Haul Route
11.00 $ 36.00
$ 472.88
$ (436.88)
8%
104
Tree trimming
1.00 $ 42.00
$ 119.84
$ (77.84)
35%
105
Soil Study [NEW FEE]
1.00 $ -
$ 651.95
$ (651.95)
0%
Wohlford Consulting Appendix 3a - Page 3 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Unit
Annual
Revenue
Surplus /
Full Cost
Activity
Total Current
Total Full Cost
(Subsidy) per
Recovery
Fee #
Fee Title
Level
Fee / Deposit
per Unit
Unit
Rate
106
0 $
$ -
$
0%
107
NPDES Fees (potential new fees):
$
$
0%
Annual Industrial Inspection - annual service
per site [No existing fee; analysis is for
108
information only]
400.00
$
$ 250.04
$ (250.04)
0%
Permanent BMP's Inspection (developer
placed) - annual service per site [No existing
109
fee; analysis is for information only]
150.00
$
$ 250.04
$ (250.04)
0%
110
0 $
$ -
$
0%
111
END OF LAND DEVELOPMENT FEES
$ -
$
00/0
Wohlford Consulting Appendix 3a - Page 4 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
112
CONTRIBUTION TO PLANNING FEES:
-
$
$
$
0%
113
Adult Business
$
$
$
00/0
114
Adult Business - Conditional Use Permit
$
$
$
$
$
0%
115
Adult Business - Employee Permit
$
$
0%
116
Adult Business - Owner Permit
$
$
0%
117
Annexation
$
0%
118
Annexation / Detachment (Actual Time @ Staff
Cost Recovery Hourly Rates) [calculated cost is
the potential deposit]
$
$ 12,521.25
$ (12,521.25)
0%
119
Pre -Annexation Agreement (Actual Time @
Staff Cost Recovery Hourly Rates) [calculated
cost is the potential deposit]
$
$ 6,240.52
$ (6,240.52)
0%
120
Appeal
-
$
$ -
$ -
0%
121
Appeal
$
$ 385.74
$ (385.74)
0%
122
Bingo License
-
$
$ -
$ -
0%
123
Bingo License
$
$
$
0%
124
0 $
$
$
0%
125
CEQA
$
00/0
126
Negative Declaration (Without Mitigation)
$
$
$
0%
127
Negative Declaration (With Mitigation)
$
$
$
0%
128
City Managed EIR
$
$ 23,103.21
$ (23,103.21)
0%
129
Supplemental EIR
$
$ 6,668.91
$ (6,668.91)
0%
130
Addendum to EIR
$
$ 7,062.01
$ (7,062.01)
0%
131
Certificate Of Historical Appropriateness
$
$ -
$
0%
132
Certificate Of Historical Appropriateness
$
$
$
0%
133
0 $
$
$
0%
134
Conditional Use Permits
$
$
$
0%
135
Conditional Use Permit - No Site Changes
$
$ 44.47
$ (44.47)
0%
136
Conditional Use Permit with Development Plan
$
$ 44.47
$ (44.47)
0%
137
Conditional Use Permit - Large Family Day
Care
$
$ 44.48
$ (44.48)
0%
138
CUP - Modification of Existing CUP
$
$ 44.47
$ (44.47)
0%
139
CC&R Review
-
$
$ -
$ -
0%
140
CC&R Review (staff)
$
$ 1,303.33
$ (1,303.33)
0%
141
Development Agreement
-
$
$ -
$ -
0%
142
Development Agreement - New
$
$ 9,743.93
$ (9,743.93)
0%
143
Development Agreement - Modification
$
$ 3,935.60
$ (3,935.60)
0%
144
145
146
0 Development Pla
Development Plan - Larger than 100,000 SF
$
$
$
$ -
$ 7,880.74
$
$ (7,880.74)
0%
0%
0%
147
Development Plan - 10,000-100,000 SF
$
$ 5,463.45
$ (5,463.45)
0%
148
Development Plan - Less than 10,000 SF
$
$ 2,503.92
$ (2,503.92)
0%
149
DIF Credit Or Reduction
-
$
$ -
$ -
0%
150
DIF Credit Or Reduction
$
$ 6,302.37
$ (6,302.37)
09/.
151
0 $
$ -
$ -
0%
Wohlford Consulting Appendix 3a - Page 5 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
152
Extension of Time
-
$
$
$
0°/u
153
Extension Of Time
$
$ 523.78
$ (523.78)
0%
154
0 $
$ -
$ -
0%
155
Finding of Public Convenience Or Necessity
$
$
$
0%
156
Finding Of Public Convenience or Necessity
(without DP or CUP)
$
$ 59.49
$ (59.49)
0%
157
Finding Of Public Convenience & or Necessity
with DP or CUP
$
$ 59.92
$ (59.92)
0%
158
General Plan Amendment
$
$ -
$ -
0%
159
General Plan Amendment - Text Or Exhibit
$
$ 4,643.05
$ (4,643.05)
0%
160
General Plan Amendment - Zoning & and/or
Land Map
$
$ 2,246.54
$ (2,246.54)
0%
161
General Plan Amendment with Fiscal Impact
Analysis [DELETE]
$
0%
162
Fiscal Impact Analysis (City Staff fee in addition
to external contractor cost) [NEW]
$
$ 1,753.10
$ (1,753.10)
0%
163
Landscape Construction Plan
$
$ -
$ -
0%
164
Landscape Construction Plan (City
administration and processing fee --in addition to
consultant review fee charged directly to
applicant)
$
$ 500.08
$ (500.08)
0%
165
Maps
-
$
$
$
0%
166
Certificate Of Compliance (support to Public
Works fee)
$
$
0%
167
Condominium Conversion
$
$ 759.88
$ (759.88)
0%
168
Condominium Map
$
$ 3,901.90
$ 33,901.90)
0%
169
Lot Line Adjustment (support to Public Works
fee)
$
0%
170
Minor Change To Approved Tentative Map
$
$ 815.97
$ (815.97)
0%
171
Parcel Merger (support to Public Works fee)
$
$
0%
172
Phasing Plan For Tentative Map
$
$ 2,587.08
$ (2,587.08)
0%
173
Reversion To Acreage
$
$ 1,385.19
$ (1,385.19)
0%
174
TPM Commercial Industrial Standard
$
$ 3,931.46
$ (3,931.46)
0%
175
TPM Commercial Industrial with Waiver
$
$ 1,987.86
$ (1,987.86)
0%
176
TPM Residential Standard
$
$ 5,129.71
$ (5,129.71)
0%
177
TPM Residential wth Waiver- Final Map
$
$ 2,493.04
$ (2,493.04)
0%
178
TPM Revised
$
$ 1,535.00
$ (1,535.00)
0%
179
TPM Vesting
$
$ 5,129.58
$ (5,129.58)
0%
180
TTM Standard - 5-34 Lots/Units (flat fee)
$
$ -
$ -
0%
181
TTM Standard 35+ units / lots
$
$ 3,212.49
$ (3,212.49)
0%
182
TTM Standard - Additional Unit Fee per lot
above 35 lots
$
$ 164.06
$ (164.06)
0%
183
TTM Standard Revised Map
$
$ 2,440.92
$ (2,440.92)
0%
184
TTM Vesting 5 - 34 lots/units (flat fee)
$
$ -
$ -
0%
185
TTM Vesting 35+ units / lots
$
$ 5,316.80
$ (5,316.80)
0%
Wohlford Consulting Appendix 3a - Page 6 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
186
TTM Vesting - Additional Unit Fee per lot above
35lots
$
$ 164.06
$ (164.06)
0%
187
TTM Vesting Revised Map
$
$ 2,441.03
$ (2,441.03)
0%
188
0 $
$ -
$
0%
189
Massage Permits
-
$
$ -
$ -
0%
190
Massage Establishment Permit
$
$
$
0%
191
Massage Establishment Permit Renewal
$
$
$
0%
192
Massage Technician License [This service is
now a state responsibility.]
$
$
$
/o
193
0 $
$
$
0%
194
Minor Exception
-
$
$
-
0%
195
Minor Exception - General
$
$
$
0%
196
Minor Exception - Individual Homeowner
$
$
$
0%
197
Modifications
$
$
$
o
198
Major Modification
$
$ 1,917.22
$ (1,917.22)
0%
199
Minor Modification
$
$ 612.72
$ (612.72)
0%
200
Minor Modification - Plan Review Only
$
$ 164.30
$ (164.30)
0%
201
Minor Modification - Plan Review Only
(Individual Homeowner)
$
$ 119.83
$ (119.83)
0%
202
Municipal Code Amendment
$
$ -
$
0%
203
Municipal Code Amendment
$
$
$
0%
204
Planned Development Overlay
$
$
$
0%
205
Planned Development Overlay
$
$ 11,781.02
$ (11,781.02)
0%
206
Planned Development Overlay -Amendment
$
$ 2,958.75
$ (2,958.75)
0%
207
Residential Tract Home Product Review
-
$
$ -
$ -
0%
208
Residential Tract Home Product Review
$
$ 479.30
$ (479.30)
0%
209
Accessory Dwelling Unit
-
$
$
$
0%
210
jAccessory Dwelling Unit
$
$ 548.77
$ (548.77)
0%
211
10 $
$ -
$
0%
212
Signage
$
$ -
$
0%
213
Sign Program Amendment
$
$ 250.87
$ (250.87)
0%
214
Sign Program - New
$
$ 295.33
$ (295.33)
0%
215
216
217
0 Specific Pla
Specific Plan - New
$
$
$
$
$ 56,082.91
$
$ (56,082.91)
0%
0%
0%
218
Specific Plan Amendment - Major
$
$ 20,687.78
$ (20,687.78)
0%
219
Specific Plan Amendment - Minor
$
$ 5,559.81
$ (5,559.81)
0%
220
0 $
$ -
$ -
0%
221
222
Temporary Use Perm,
Temporary Use Permit - Minor Regular
-
$
$
-
$ 164.30
-
$ (164.30)
0%
0%
223
Temporary Use Permit - Major Regular
$
$ 415.16
$ (415.16)
0%
224
Temporary Use Permit - Major Non Profit
$
$ 284.12
$ (284.12)
0%
225
Temporary Use Permit - Minor Non Profit
$
$ 164.30
$ (164.30)
0%
226
Temporary Use Permit - Model Home Complex
$
$ 763.44
$ (763.44)
09/6
227
Temporary Use Permit - Sales / Construction
Trailer
$
$ 1,253.12
$ (1,253.12)
0%
Wohlford Consulting Appendix 3a - Page 7 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Unit
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
228
0 $
$
$
0%
229
Variance
$
$
$
0%
230
Variance
$
$ 119.29
$ (119.29)
0%
231
Vendors License
$
$
0%
232
Vendors License
$
$
$
0%
233
0 $
$
$
0%
234
fireless Antenna Facility
-
$
$
o
235
Wireless Antenna Facility - Administrative
Review
$
$ 359.48
$ (359.48)
0%
236
Wireless Antenna Facility - Revision with Public
Hearing
$
$ 718.95
$ (718.95)
0%
237
lWireless Antenna Facility- New
$
$ 1,198.27
$ (1,198.27)
09/.
238
lZoning Letter
$
$ -
$ -
0%
239
Zoning Letter
$
$
$
0%
240
End of Planning Fees
$
$
$
0%
241
0 $
$
$
0%
242
CONTRIBUTION TO INDIVIDUAL BUILDING
FEES:
$
0%
243
Accessory Structure 0 to 500 sf
$
$
$
0%
244
Accessory Structure 500 to 1000 sf
$
$
$
0%
245
Accessory Structure 1001 sf +
$
$
$
0%
246
0 $
$
$
0%
247
Pool - Gunite (up to 800 s.f.)
$
$
$
0%
248
Each additional 800 s.f.
$
$
$
0%
249
Pool - Commercial pool (up to 800 sf)
$
$
$
0%
250
Each additional 800 sf
$
$
$
0%
251
253
0 n o, Building Fees
0 $
$
$
Is
$
Is
0%
070
0%
Wohlford Consulting Appendix 3a - Page 8 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
254
FULL COST RECOVERY RATES (HOURLY
STAFF RATES:
$
$
$
0%
255
Service in Excess of Standard (per hour @ staff
hourly rates and at the discretion of the Director
or His/Her Designee)
$
$
$
0%
256
Associate Engineer I (per hour)
$ 93.55
$ 214.43
$ (120.88)
44%
257
Associate Civil Engineer (per hour)
$ 126.44
$ 243.32
$ (116.88)
52%
258
Senior Civil Engineer (per hour)
$ 139.10
$ 288.30
$ (149.20)
48%
259
Associate Engineer II (per hour)
$ 118.87
$ 236.46
$ (117.59)
50%
260
Public Works Inspector / Sr. PW Insp. (per
hour)
$ 89.06
$ 210.87
$ (121.81)
42%
261
Public Works Director (per hour)
$ 266.94
$ 404.20
$ (137.26)
66%
262
Office Specialist (per hour)
$ 53.95
$ 165.11
$ (111.16)
33%
263
Administrative Assistant (per hour)
$ 62.53
$ 165.39
$ (102.86)
38%
264
Senior Management Analyst (per hour)
$ 135.65
$ 252.07
$ (116.42)
54%
265
Assistant Engineer (per hour)
$ 100.16
$ 245.29
$ (145.13)
41 %
266
Landscape Inspector (per hour)
$ 116.40
$ 252.78
$ (136.38)
46%
267
Engineering Tech (per hour)
$ -
$ 182.18
$ (182.18)
0%
268
269
270
Overtime - $500 deposit
NON -FEE ACTIVITIES:
Counter / General Assistance: Pre -Project
Support (annual)
$
$
$
$ -
$ -
$
$
0%
00/0
0%
271
Counter / General Assistance: Public
Information (general, non -project) & Direct
Assistance (e.g., speed bumps, stop signs, etc.)
- not recoverable (annual)
$
$ 105,728.85
$ (105,728.85)
0%
272
CIP (annual)
$
$ -
$
0%
273
Other City Projects (annual)
$
$
$
0%
274
General Plan Update (annual)
$
$
$
0%
275
Zoning Ordinance / Development Code Update
(annual)
$
$
$
0%
276
PC / Other Commission Support (annual)
$
$
$
00/u
277
Council / Constituent Referrals (annual)
$
$
$
0%
278
CEQA Support - Public Projects (annual)
$
$
$
00/u
279
Neighborhood Planning/Meetings (annual)
$
$
$
0%
280
Non-CIP ROW (annual)
$
$
$
0%
281
Development Impact Fee Report (annual)
$
$
$
0%
282
Pavement Management Program (annual)
$
$
$
0%
283
GIs Maintenance & Updating (annual)
$
$
$
0%
284
GIS - Other Departments (annual)
$
$
$
0%
285
Altair Project (annual)
$
$
$
0%
286
0 $
$
$
0%
287
Other Non -Fee Activities (annual)
$
$ 524,968.69
$ (524,968.69)
0%
288
0 $
$ -
$
00%
Wohlford Consulting Appendix 3a - Page 9 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Total Current
Fee / Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
289
SUPPPORT TO OTHER DEPARTMENTS I
DIVISIONS:
$
$ -
$ -
0%
290
Support to Building - general (annual)
$
$ 57,003.11
$ (57,003.11)
0%
291
Support to Code Enforcement - Zoning (annual)
$
$ -
$
0%
292
Support to Code Enforcement - Building
(annual)
$
$
$
0%
293
Support to Code Enforcement - Other (annual)
$
$
$
0%
294
Support to Planning - general (annual)
$
$
$
0%
295
Support to Police (annual)
$
$
$
0%
296
Support to Fire (annual)
$
$
$
0%
297
Support to Housing (annual)
$
$
$
0%
298
Support to All Other Departments (annual)
$
$ 44,564.11
$ (44,564.11)
0°/u
299
Support to Other Agencies and Jurisdictions
(annual)
$
$ -
$
0%
300
0 $
$
$
0%
301
END OF FEE AND SERVICE LIST
$
0%
TOTALS:
Wohlford Consulting Appendix 3a - Page 10 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost
Projected
Annual
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual
Revenue at
Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
1 PUBLIC WORKS PLAN CHECK FEES
$ -
$ -
$
0%
$
-
$ -
$ -
0%
2 CLEARING (per acre)
$ 4,334
$ 6,972
$ (2,638)
62%
$
4,334
$ 6,972
$ (2,638)
62%
GRADING:
$ -
$ -
$
0%
$
-
$ -
$ -
0%
4 EARTHWORK - See "On / Off -Site
Improvements" Fees
$ -
$ -
$
0%
$
-
$ -
$
0%
5 SUBDIVISION PRECISE GRADING PLAN
(excluding Custom Lots) - Base Fee
$ 697
$ 3,435
$ (2,737)
20%
$
697
$ 3,435
$ (2,737)
20%
6 SUBDIVISION PRECISE GRADING PLAN
(excluding Custom Lots) - Per Lot
$ 4,598
$ 64,070
$ (59,472)
7%
$
4,598
$ 64,070
$ (59,472)
7%
7 PLAN REVISION (per sheet)
$ 30,438
$ 35,664
$ (5,226)
85%
$
30,438
$ 35,664
$ (5,226)
85%
8 4th and SUBSEQUENT REVIEW (per sheet)
$ 13,464
$ 17,123
$ (3,659)
79%
$
13,464
$ 17,123
$ (3,659)
79%
9 0
$ -
$ -
$
0%
$
-
$ -
$
0%
10 ON / OFF -SITE IMPROVEMENTS PLAN
CHECK:
$
$
$
0%
$
$
$
0%
11 ONSITE PLANCHECK: Percentage of
Engineer's Construction Security Worksheet:
$ -
$ -
$
0%
$
$
$
0%
12 Small project: Example Size = $76,000
$ 39,693
$ 86,393
$ (46,701)
46%
$
39,693
$ 86,393
$ (46,701)
46%
13 Medium project: Example Size = $517,000
$ 102,782
$ 122,775
$ (19,993)
84%
$
102,782
$ 122,775
$ (19,993)
84%
14 Large project: Example Size = $3,055,500
$ 119,430
$ 140,221
$ (20,791)
85%
$
119,430
$ 140,221
$ (20,791)
85%
15 0
$ -
$ -
$
0%
$
-
$ -
$
0%
16 OFFSITE PLANCHECK Percentage of
Engineer's Construction Security Worksheet:
$ -
$ -
$
0%
$
-
$ -
$
0°/0
17 Small project: Example Size = $ 102,000
$ 26,354
$ 40,520
$ (14,166)
65%
$
26,354
$ 40,520
$ (14,166)
65%
18 Medium project: Example Size = $ 497,500
$ 79,188
$ 72,902
$ 6,286
109%
$
79,188
$ 72,902
$ 6,286
109%
19 Large project: Example Size = $4,200,000
$ 164,008
$ 159,474
$ 4,534
103%
$
164,008
$ 159,474
$ 4,534
103%
20 0
$ -
$ -
$ -
0%
$
$ -
$ -
0%
21 TRAFFIC CONTROL PLAN:
$
$ 179,178
0%
16%
$
28,431
$
-
0%
16%
22 TRAFFIC CONTROL PLAN (per sheet)
$ 28,431
$ (150,747)
$ 179,178
$ (150,747)
23 Traffic Control Plan - 4th and each subsequent
review [NEW CATEGORY]
$ -
$ 128
$ (128)
0%
$
-
$ 128
$ (128)
0°/u
24 0
$
$ -
$ -
0%
$
$ -
$ -
0%
25 LEGAL DOCUMENT REVIEW
$
$
0%
$
$
0%
26 Certificate of Correction
$ 92
$ 289
$ (197)
32%
$
92 $ 289
$ (197)
32%
27 Full General Vacation
$ 497
$ 434
$ 63
114%
$
497
$ 434
$ 63
114%
28 Summary Vacation
$ 200
$ 347
$ (147)
58%
$
200
$ 347
$ (147)
589/6
29 Public Dedication - not related to a map
$ 8,712
$ 18,265
$ (9,553)
48%
$
8,712
$ 18,265
$ (9,553)
48%
30 Miscellaneous Legal Document
$ 49
$ 232
$ (183)
21%
$
49 $ 232
$ (183)
21%
31 Certificate Of Compliance
$ 3,336
$ 4,994
$ (1,658)
67%
$
3,336
$ 4,994
$ (1,658)
67%
32 Lot Line Adjustment
$ 4,569
$ 12,023
$ (7,455)
38%
$
4,569
$ 12,023
$ (7,455)
38%
33 Parcel Merger
$ 4,029
$ 7,790
$ (3,761)
52%
$
4,029
$ 7,790
$ (3,761)
52%
34 0
$ -
$ -
$
0%
$
-
$ -
$
0%
35 0
$ -
$ -
$
0%
$
-
$ -
$
00/0
Wohlford Consulting Appendix 3a - Page 11 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual
Revenue at
Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
36 FINAL MAP REVIEW (Parcel and Tract Maps)
$ -
$ -
$
0%
$
-
$ -
$
0%
37 Base Fee
$ 40,320
$ 50,813
$ (10,493)
79%
$
40,320
$ 50,813
$ (10,493)
799/6
38 PER SHEET (NEW STRUCTURE)
$ -
$ 29,938
$ (29,938)
0%
$
-
$ 29,938
$ (29,938)
0%
39 Monument Review (SEE NOTE)
$ 2,055
$ 24,026
$ (21,971)
9%
$
2,055
$ 24,026
$ (21,971)
9%
40 Amended Maps (Parcel and Tract) per sheet
$ 593
$ 1,505
$ (912)
39%
$
593
$ 1,505
$ (912)
39%
41 Final Map - 4th and subsequent review (per
sheet)
$ 8,008
$ 19,799
$ (11,791)
40%
$
8,008
$ 19,799
$ (11,791)
40%
42 0
$ -
$ -
$
0%
$
-
$ -
$
0%
43 FEMA STUDIES
$
$
$
0%
$
-
$ -
$
0%
44 Conditional Letter of Map Revision (CLOMR)
Review
$ 687
$ 381
$ 306
180%
$
687
$ 381
$ 306
180%
45 Letter of Map Amendment (LOMA) Review
$ 239
$ 381
$ (142)
63%
$
239
$ 381
$ (142)
63%
46 Letter of Map Revision (LOMR) Review
$ 219
$ 351
$ (132)
62%
$
219
$ 351
$ (132)
62%
47 Flood Certification Review [NEW FEE]
$ -
$ 2,427
$ (2,427)
0%
$
-
$ 2,427
$ (2,427)
0%
48 0
$ -
$ -
$
0%
$
-
$ -
$ -
0%
49 50
HYDROLOG
Drainage tributary area up to 20 acres [NEW
CATEGORY]
$
$ 28,290
$
$ 36,623
$ -
$ (8,333)
0%
77%
$
$
28,290
$
$ 36,623
$
$ (8,333)
0%
77%
51 Drainage tributary area over 20 acres [NEW
CATEGORY]
$ 12,375
$ 17,079
$ (4,704)
72%
$
12,375
$ 17,079
$ (4,704)
72%
52 Hydrology Revision (NEW)
$
$ 1,954
$ (1,954)
0%
$
-
$ 1,954
$ (1,954)
0%
53 54
WQMP Plan Chec
SWQPM Standard
-
$ 3,308
$ -
$ 3,010
$
$ 298
0%
110%
$
$
3,308
$
$ 3,010
$
$ 298
0%
110%
55 SWQPM Priority Development
$ 46,615
$ 59,160
$ (12,545)
79%
$
46,615
$ 59,160
$ (12,545)
79%
56 WQMP Revision [NEW FEE]
$ -
$ 3,950
$ (3,950)
0%
$
-
$ 3,950
$ (3,950)
0°/u
57 0
$ -
$ -
$
0%
$
-
$ -
$ -
0%
58 59
Traffic Impact Analysis
Minor
$ 3,309
-
$ 2,311
$
$ 998
%
143%
$
$
-
3,309
$
$ 2,311
$
$ 998
0%
143%
60 Major
$ 827
$ 6,764
$ (5,937)
12%
$
827
$ 6,764
$ (5,937)
12%
61 0
$ -
$ -
$
0%
$
-
$ -
$
0%
62 PARKS and MAINTENANCE: 111M.
$
$
$
0%
$
$
00/0
63 PARKS & MAINTENANCE PLANCHECK
Percentage of Engineer's Construction Security
Worksheet:
$ -
$ -
$
0%
$
-
$ -
$
0%
64 Small project: Example Size = $ 50,000
$ 12,223
$ 13,540
$ (1,317)
90%
$
12,223
$ 13,540
$ (1,317)
90%
65 Medium project: Example Size = $ 200,000
$ 19,101
$ 27,613
$ (8,512)
69%
$
19,101
$ 27,613
$ (8,512)
69%
66 Large project: Example Size = $ 750,000
$ 10,615
$ 12,158
$ (1,543)
87%
$
10,615
$ 12,158
$ (1,543)
87%
67 0
$ -
$ -
$
0%
$
-
$ -
$ -
0%
68 PUBLIC WORKS INSPECTION FEES
$ -
$ -
$
0%
$
-
$
$
00/0
69 CLEARING (per acre)
$ 3,320
$ 2,386
$ 934
139%
$
3,320
$ 2,386
$ 934
139%
70 0
$ -
$ -
$ -
0%
$
-
$ -
$ -
00/0
Wohlford Consulting Appendix 3a - Page 12 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual
Revenue at
Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
71 ON / OFF -SITE IMPROVEMENTS
INSPECTION:
$
$
$
0%
$
$
$
0%
72 ONSITE INSPECTION Percentage of
Engineer's Construction Security Worksheet:
$
$
$
0%
$
$
$
0%
73 Small project: Example Size = $76,000
$ 39,693
$ 86,104
$ (46,412)
46%
$
39,693
$ 86,104
$ (46,412)
46%
74 Medium project: Example Size = $517,000
$ 205,565
$ 163,685
$ 41,880
126%
$
205,565
$ 163,685
$ 41,880
126%
75 Large project: Example Size = $3,055,500
$ 238,861
$ 181,944
$ 56,916
131%
$
238,861
$ 181,944
$ 56,916
131%
76 0
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
77 OFFSITE INSPECTION Percentage of
Engineer's Construction Security Worksheet:
$ -
$ -
$ -
0%
$
-
$ -
$
0%
78 Small project: Example Size = $ 102,000
$ 26,354
$ 31,026
$ (4,672)
85%
$
26,354
$ 31,026
$ (4,672)
85%
79 Medium project: Example Size = $ 497,500
$ 59,391
$ 63,905
$ (4,514)
93%
$
59,391
$ 63,905
$ (4,514)
93%
80 Large project: Example Size = $4,200,000
$ 328,017
$ 241,988
$ 86,029
136%
$
328,017
$ 241,988
$ 86,029
136%
81 0
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
82 Overtime - $500 deposit
$
$
$
0%
$
$
$
0%
83 0
$
$
$
0%
$
$
$
0%
84 PARKS AND LANDSCAPE MAINTENANCE:
$
$
$
0%
$
$
0%
85 PARKS & MAINTENANCE INSPECTION
Percentage of Engineer's Construction Security
Worksheet:
$
$
$
0%
$
$
$
0%
86 Small project: Example Size = $ 50,000
$ 6,903
$ 24,937
$ (18,034)
28%
$
6,903
$ 24,937
$ (18,034)
28%
87 Medium project: Example Size = $ 200,000
$ 11,079
$ 69,119
$ (58,041)
16%
$
11,079
$ 69,119
$ (58,041)
16%
88 Large project: Example Size = $ 750,000
$ 4,288
$ 31,161
$ (26,873)
14%
$
4,288
$ 31,161
$ (26,873)
14%
89 0
$ -
$ -
$
0%
$
-
$ -
$
0%
90 OTHER PUBLIC WORKS FEES
$
$
0%
$
0%
91 Encroachment Fees:
-
$
$
0%
$
0%
31%
92 Block Party
$ 2
$ 6
$ (4)
31%
$ 2
$ 6
$ (4)
93 Driveway - Residential
$ 945
$ 4,391
$ (3,446)
22%
$
945
$ 4,391
$ (3,446)
22%
94 Driveway -Commercial
$ 156
$ 976
$ (820)
16%
$
156
$ 976
$ (820)
16%
95 Excavation: Base Fee
$ 33,120
$ 202,487
$ (169,367)
16%
$
33,120
$ 202,487
$ (169,367)
16%
96 Excavation: Parallel / Street Crossing - Depth
up to 5 feet - per 100 If (in addition to the
Excavation Base Fee)
$ 88,320
$ 143,142
$ (54,822)
62%
$
88,320
$ 143,142
$ (54,822)
62°/u
97 Excavation: Parallel / Street Crossing - Depth
greater than 5 feet - per 100 If (in addition to the
Excavation Base Fee)
$ 28
$ ill
$ (83)
25%
$
28 $ ill
$ (83)
25%
98 Utility Access
$ 6,615
$ 106,288
$ (99,673)
6%
$
6,615
$ 106,288
$ (99,673)
6%
99 Movie Filming
$ 62
$ 41
$ 21
150%
$
62 $ 41
$ 21
1500/6
100
Parkway Drain (maximum 2 per lot)
$ 468
$ 1,360
$ (892)
34%
$
468
$ 1,360
$ (892)
34°/u
101
Street Closure
$ 166
$ 719
$ (553)
23%
$
166
$ 719
$ (553)
239/6
102
UtilityCompany- AnnualBlanket
$ 3,353
$ 25,268
$ (21,915)
13%
$
3,353
$ 25,268
$ (21,915)
13%
103
Haul Route
$ 396
$ 5,202
$ (4,806)
8%
$
396
$ 5,202
$ (4,806)
8%
104
Tree trimming
$ 42
$ 120
$ (78)
35%
$
42 $ 120
$ (78)
35%
105
Soil Study [NEW FEE]
$ -
$ 652
$ (652)
0%
$
-
$ 652
$ (652)
0%
Wohlford Consulting Appendix 3a - Page 13 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services
Potential Revenue Results (Fee Services Only)
Projected
Projected
Projected
Annual
Projected
Annual
Annual
Projected
Revenue at
Projected
Annual
Full Cost
Revenue at
Revenue at
Annual
Full Cost
Current Fee /
Annual Full
Surplus /
Recovery
Current Fee /
Full Cost per
Surplus /
Recovery
Fee #
Fee Title
Deposit
Cost(Subsidy)
Rate
Deposit
Unit(Subsidy)
Rate
106
0 $
$
$ -
0%
$
$
$
0%
107
NPDES Fees (potential new fees):
$
$
$
0%
$
$
$
00/0
Annual Industrial Inspection - annual service
per site [No existing fee; analysis is for
108
information only]
$
$ 100,016
$ (100,016)
0%
$
$ 100,016
$ (100,016)
0%
Permanent BMP's Inspection (developer
is
placed) - annual service per site [No existing
109
fee; analysis is for information only]
$
$ 37,506
$ (37,506)
0%
$
$ 37,506
$ (37,506)
0%
110
0 $
$ -
$
0%
$ -
$ -
0%
111
END OF LAND DEVELOPMENT FEES
$
$ -
$
0%
$
0%
Wohlford Consulting Appendix 3a - Page 14 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual
Revenue at
Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
112
CONTRIBUTION TO PLANNING FEES:
113
Adult Business
114
Adult Business - Conditional Use Permit
115
Adult Business - Employee Permit
116
Adult Business - Owner Permit
117
Annexation
118
Annexation / Detachment (Actual Time @ Staff
Cost Recovery Hourly Rates) [calculated cost is
the potential deposit]
119
Pre -Annexation Agreement (Actual Time @
Staff Cost Recovery Hourly Rates) [calculated
cost is the potential deposit]
120
Appeal
121
Appeal
122
Bingo License
123
Bingo License
124
0 125
CEQA
126
Negative Declaration (Without Mitigation)
127
Negative Declaration (With Mitigation)
128
City Managed EIR
129
Supplemental EIR
130
Addendum to EIR
131
Certificate Of Historical Appropriateness
132
Certificate Of Historical Appropriateness
133
0 134
Conditional Use Permits
135
Conditional Use Permit - No Site Changes
136
Conditional Use Permit with Development Plan
137
Conditional Use Permit - Large Family Day
Care
138
CUP - Modification of Existing CUP
139
CC&R Review
140
CC&R Review (staff)
141
Development Agreement
142
Development Agreement - New
143
Development Agreement - Modification
144
0 145
146
Development Pla
Development Plan - Larger than 100,000 SF
147
Development Plan - 10,000-100,000 SF
148
Development Plan - Less than 10,000 SF
149
DIF Credit Or Reduction
150
DIF Credit Or Reduction
151
0 Wohlford Consulting Appendix 3a - Page 15 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual
Revenue at
Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
152
Extension of Time
153
Extension Of Time
154
0 155
Finding of Public Convenience Or Necessity
156
Finding Of Public Convenience or Necessity
(without DP or CUP)
157
Finding Of Public Convenience & or Necessity
with DP or CUP
158
General Plan Amendment
159
General Plan Amendment - Text Or Exhibit
160
General Plan Amendment - Zoning & and/or
Land Map
161
General Plan Amendment with Fiscal Impact
Analysis [DELETE]
162
Fiscal Impact Analysis (City Staff fee in addition
to external contractor cost) [NEW]
163
Landscape Construction Plan
164
Landscape Construction Plan (City
administration and processing fee --in addition to
consultant review fee charged directly to
applicant)
165
Maps
166
Certificate Of Compliance (support to Public
Works fee)
167
Condominium Conversion
168
Condominium Map
169
Lot Line Adjustment (support to Public Works
fee)
170
Minor Change To Approved Tentative Map
171
Parcel Merger (support to Public Works fee)
172
Phasing Plan For Tentative Map
173
Reversion To Acreage
174
TPM Commercial Industrial Standard
175
TPM Commercial Industrial with Waiver
176
TPM Residential Standard
177
TPM Residential wth Waiver- Final Map
178
TPM Revised
179
TPM Vesting
180
TTM Standard - 5-34 Lots/Units (flat fee)
181
TTM Standard 35+ units / lots
182
TTM Standard - Additional Unit Fee per lot
above 35 lots
183
TTM Standard Revised Map
184
TTM Vesting 5 - 34 lots/units (flat fee)
185
TTM Vesting 35+ units / lots
Wohlford Consulting Appendix 3a - Page 16 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Projected
Annual
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
186
TTM Vesting - Additional Unit Fee per lot above
35lots
187
TTM Vesting Revised Map
188
0 189
Massage Permits
190
Massage Establishment Permit
191
Massage Establishment Permit Renewal
192
Massage Technician License [This service is
now a state responsibility.]
193
0 194
Minor Exception
195
Minor Exception - General
196
Minor Exception - Individual Homeowner
197
Modifications
198
Major Modification
199
Minor Modification
200
Minor Modification - Plan Review Only
201
Minor Modification - Plan Review Only
(Individual Homeowner)
202
Municipal Code Amendment IN-
203
Municipal Code Amendment
204
Planned Development Overlay
205
Planned Development Overlay
206
Planned Development Overlay -Amendment
207
Residential Tract Home Product Review
208
Residential Tract Home Product Review
209
lAccessory Dwelling Unit
210
JAccessory Dwelling Unit
211
10 212
Signage
213
Sign Program Amendment
214
Sign Program - New
215
0 216
217
Specific Pla
Specific Plan - New
218
Specific Plan Amendment - Major
219
Specific Plan Amendment - Minor
220
0 221
Temporary Use Permits
222
Temporary Use Permit - Minor Regular
223
Temporary Use Permit - Major Regular
224
Temporary Use Permit - Major Non Profit
225
Temporary Use Permit - Minor Non Profit
226
Temporary Use Permit - Model Home Complex
227
Temporary Use Permit - Sales / Construction
Trailer
Wohlford Consulting Appendix 3a - Page 17 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Projected
Annual
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
228
0 229
Variance
230
Variance
231
Vendors License
232
Vendors License
233
0 234
Wireless Antenna Facility
235
Wireless Antenna Facility - Administrative
Review
236
Wireless Antenna Facility - Revision with Public
Hearing
237
Wireless Antenna Facility - New
238
Zoning Letter
239
Zoning Letter
240
End of Planning Fees
241
0 242
CONTRIBUTION TO INDIVIDUAL BUILDING
FEES:
243
Accessory Structure 0 to 500 sf
244
Accessory Structure 500 to 1000 sf
245
Accessory Structure 1001 sf +
246
0 247
Pool - Gunite (up to 800 s.f.)
248
Each additional 800 s.f.
249
Pool - Commercial pool (up to 800 sf)
250
Each additional 800 sf
251
0 n oT SO mg ees
253
10 Wohlford Consulting Appendix 3a - Page 18 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services
Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual
Revenue at
Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
254
FULL COST RECOVERY RATES (HOURLY
STAFF RATES:
$
$
$
0%
$
$
$
00/0
255
Service in Excess of Standard (per hour @ staff
hourly rates and at the discretion of the Director
or His/Her Designee)
$
$
$
0%
$
$
$
0%
256
Associate Engineer I (per hour)
$
$ 214
$ (214)
0%
$
$
$
00/0
257
Associate Civil Engineer (per hour)
$
$ 243
$ (243)
0%
$
$
$
0%
258
Senior Civil Engineer (per hour)
$
$ 288
$ (288)
0%
$
$
$
00/0
259
Associate Engineer II (per hour)
$
$ 236
$ (236)
0%
$
$
$
0%
260
Public Works Inspector / Sr. PW Insp. (per
hour)
$
$ 211
$ (211)
0%
$
$
$
0%
261
Public Works Director (per hour)
$
$ 404
$ (404)
0%
$
$
$
00/0
262
Office Specialist (per hour)
$
$ 165
$ (165)
0%
$
$
$
0%
263
Administrative Assistant (per hour)
$
$ 165
$ (165)
0%
$
$
$
0%
264
Senior Management Analyst (per hour)
$
$ 252
$ (252)
0%
$
$
$
0%
265
Assistant Engineer (per hour)
$
$ 245
$ (245)
0%
$
$
$
0%
266
Landscape Inspector (per hour)
$
$ 253
$ (253)
0%
$
$
$
0%
267
Engineering Tech (per hour)
$
$ 182
$ (182)
0%
$
$
$
00/0
268
Overtime - $500 deposit
$
$ -
$ -
0%
$
$
$
0%
269
NON -FEE ACTIVITIES:
$
$
0%
$
$
00/0
270
Counter / General Assistance: Pre -Project
Support (annual)
$
$
$
0%
$
$
$
00/0
271
Counter / General Assistance: Public
Information (general, non -project) & Direct
Assistance (e.g., speed bumps, stop signs, etc.)
- not recoverable (annual)
$
$ 105,729
$ (105,729)
0%
$
$
$
00/0
272
CIP (annual)
$
$ -
$
0%
$
$
$
0%
273
Other City Projects (annual)
$
$
$
0%
$
$
$
00/0
274
General Plan Update (annual)
$
$
$
0%
$
$
$
0%
275
Zoning Ordinance / Development Code Update
(annual)
$
$
$
0%
$
$
$
0%
276
PC / Other Commission Support (annual)
$
$
$
00/0
$
$
$
0%
277
Council / Constituent Referrals (annual)
$
$
$
0%
$
$
$
0%
278
CEQA Support - Public Projects (annual)
$
$
$
0%
$
$
$
00/0
279
Neighborhood Planning/Meetings (annual)
$
$
$
0%
$
$
$
0%
280
Non-CIP ROW (annual)
$
$
$
0%
$
$
$
0%
281
Development Impact Fee Report (annual)
$
$
$
0%
$
$
$
0%
282
Pavement Management Program (annual)
$
$
$
0%
$
$
$
00/0
283
GIS Maintenance & Updating (annual)
$
$
$
0%
$
$
$
0%
284
GIS - Other Departments (annual)
$
$
$
0%
$
$
$
0%
285
Altair Project (annual)
$
$
$
0%
$
$
$
0%
286
0 $
$
$
0%
$
$
$
0%
287
Other Non -Fee Activities (annual)
$
$ 524,969
$ (524,969)
0%
$
$
$
0%
288
0 $
$ -
$
0%
$
$
$
00/0
Wohlford Consulting Appendix 3a - Page 19 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services
Fee #
Fee Title
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full
Cost(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
289
SUPPPORT TO OTHER DEPARTMENTS /
DIVISIONS:
$
$ -
$ -
0%
290
Support to Building - general (annual)
$
$ 57,003
$ (57,003)
0%
291
Support to Code Enforcement - Zoning (annual)
$
$ -
$
0%
292
Support to Code Enforcement - Building
(annual)
$
$
$
0%
293
Support to Code Enforcement - Other (annual)
$
$
$
0%
294
Support to Planning - general (annual)
$
$
$
0%
295
Support to Police (annual)
$
$
$
0%
296
Support to Fire (annual)
$
$
$
0%
297
Support to Housing (annual)
$
$
$
0%
298
Support to All Other Departments (annual)
$
$ 44,564
$ (44,564)
0%
299
Support to Other Agencies and Jurisdictions
(annual)
$
$ -
$
0%
300
0 $
$
$
0%
301
END OF FEE AND SERVICE LIST
$
0%
TOTALS:
$ 1,880,827
$ 3,546,677
$ (1,665,850)
53%
Revenue Totals
Potential Revenue Results (Fee Services Only)
Projected
Annual
Revenue at
Current Fee /
Deposit
Projected
Annual
Revenue at
Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
$
$
$
0%
$
$
$
0%
$
$
$
0%
$
$
$
0%
$
$
$
0%
$
$
$
00/0
$
$
$
0%
$
$
$
00/0
$
$
$
0%
$
$
$
00/0
$
$
$
00/0
$
$
$
$
0%
$
/°
[T77T787787077,827
1 $ 2,811,552
1 $ (930,724)
67%
Revenue Totals
Wohlford Consulting Appendix 3a - Page 20 of 20 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
PERCENTAGE FEES DETERMINATION
(with Multiple Options)
Fee Service Information
Percenta a Fee Calculations
Fee #
Fee Title
Size Basis
($ amount)
WEIGHTED
Combined
Size Basis
($ amount)
Current %
(average)
Calculated
Current Fee
Full Cost
(from original
Fee Study)
Potential
Desired
Cost
Recovery
Original
Proposed
Fee Level
WEIGHTED
Combined
Proposed Fee
Level Total
Fee %at
Original
Proposed
Level
WEIGHTED
Fee % at
Proposed
Level
Gross %
Change
Relative %
Change
10 ON / OFF -SITE IMPROVEMENTS PLAN
CHECK:
$
$
$ -
$ 230.50
$
$
0.00%
0.00%
0.00%
0.00%
0.00%
11 ONSITE PLANCHECK: Percentage of
Engineer's Construction Security Worksheet:
0.00%
12 Small project: Example Size = $76,000
$ 76,000
$ 912,000
4.35%
$ 3,307.73
$ 7,199.44
100.0%
$ 7,199.44
$ 86,393.28
9.47%
9.47%
5.12%
117.65%
13 Medium project: Example Size = $517,000
$ 517,000
$ 2,585,000
3.98%
$ 20,556.47
$ 24,555.01
100.0%
$ 24,555.01
$ 122,775.05
4.75%
4.75%
0.77%
19.45%
14 1 Large project: Example Size = $3,055,500
$ 3,055,500
$ 3,055,500
3.91%
$ 119,430.39
$ 140,220.97
100.0%
$ 140,220.97
$ 140,220.97
4.59%
4.59%
0.68%
17.41%
COMBINED SIZES:
$ 3,648,500
$ 6,552,500
3.93%
$ 143,294.59
$ 171,975.42
100.0%
$ 171,975.42
$ 349,389.30
4.71%
5.33%
0.79%
20.02%
16 OFFSITE PLANCHECK Percentage of
Engineer's Construction Security Worksheet:
$
$ 230.50
$
0.00%
0.00%
0.00%
17 Small project: Example Size = $ 102,000
$ 102,000
$ 612,000
4.31 %
$ 4,392.33
$ 6,753.39
100.0%
$ 6,753.39
$ 40,520.34
6.62%
6.62%
2.31 %
53.75%
18 Medium project: Example Size = $ 497,500
$ 497,500
$ 1,990,000
3.98%
$ 19,796.95
$ 18,225.57
100.0%
$ 18,225.57
$ 72,902.28
3.66%
3.66%
-0.32%
-7.94%
19 Large project: Example Size = $4,200,000
$ 4,200,000
$ 4,200,000
3.90%
$ 164,008.36
$ 159,474.07
100.0%
$ 159,474.07
$ 159,474.07
3.80%
3.80%
-0.11%
-2.76%
COMBINED SIZES:
$ 4,799,500
$ 6,802,000
3.92%
$ 188,197.65
$ 184,453.03
100.0%
$ 184,453.03
$ 272,896.69
3.84%
4.01%
-0.08%
-1.990/0
CONSOLIDATED ON/OFF-SITE
PLAN CHECK:
$ 8 448,000
$13,354,500
3.92%
$ 331,492
$ 356,428
100.0%
$ 356,428
$ 622,286
4.22%
4.66%
0.30%
7.52%
62 PARKS and MAINTENANCE:
AM -
$ -
$ -
0.00%
0.000/0
0.000/0
63 PARKS & MAINTENANCE PLANCHECK
Percentage of Engineer's Construction Security
Worksheet:
$ -
$ -
$ -
0.00%
0.00%
0.00%
64 Small project: Example Size = $ 50,000
$ 50,000
$ 100,000
12.22%
$ 6,111.72
$ 6,770.21
100.0%
$ 6,770.21
$ 13,540.42
13.54%
13.54%
1.32%
10.77%
65 Medium project: Example Size = $ 200,000
$ 200,000
$ 400,000
4.78%
$ 9,550.48
$ 13,806.63
100.0%
$ 13,806.63
$ 27,613.26
6.90%
6.90%
2.13%
44.56%
66 Large project: Example Size = $ 750,000
$ 750,000
$ 375,000
2.83%
$ 21,229.41
$ 24,315.98
100.0%
$ 24,315.98
$ 12,157.99
3.24%
3.24%
0.41%
14.54%
COMBINED SIZES:
$ 1,000,000
$ 875,000
3.691/6
$ 36,891.60
$ 44,892.82
100.0%
$ 44,892.82
$ 53,311.67
4.49%
6.09%
0.80%
21.69"/°
CONSOLIDATED ON/OFF-SITE & PARK
PLAN CHECK:
$ y 448 000
$14,229,500
3.90%
$ 368,384
$ 401,321
100.0%
$ 401,321
$ 675,598
4.25%
4.75%
0.35%
8.94%
Wohlford Consulting Appendix 3b - Page 1 of 3 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
PERCENTAGE FEES DETERMINATION
(with Multiple Options)
Fee Service Information
Percenta a Fee Calculations
WEIGHTED
Potential
WEIGHTED
Fee%at
WEIGHTED
Combined
Full Cost
Desired
Original
Combined
Original
Fee % at
Size Basis
Size Basis
Current %
Calculated
(from original
Cost
Proposed
Proposed Fee
Proposed
Proposed
Gross %
Relative %
Fee #
Fee Title
($ amount)
($ amount)
(average)
Current Fee
Fee Study)
Recovery
Fee Level
Level Total
Level
Level
Change
Change
ON / OFF -SITE IMPROVEMENTS
$
$
$
0.00%
0.00%
0.00%
71 INSPECTION:
$
_T
$
0.00%
0.00%
0.00%
ONSITE INSPECTION Percentage of
$
72 Engineer's Construction Security Worksheet:
73 Small project: Example Size = $76,000
$ 76,000
$ 912,000
4.35%
$ 3,307.73
$ 7,175.36
100.0%
$ 7,175.36
$ 86,104.32
9.44°/u
9.44%
5.09°/u
116.93%
74 Medium project: Example Size = $517,000
$ 517,000
$ 5,170,000
3.98%
$ 20,556.47
$ 16,368.51
100.0%
$ 16,368.51
$ 163,685.10
3.17%
3.17%
-0.81%
-20.37%
75 1 Large project: Example Size = $3,055,500
$ 3,055,500
$ 6,111,000
3.91 %
$ 119,430.39
$ 90,972.22
100.0%
$ 90,972.22
$ 181,944.44
2.98%
2.98%
1 -0.93%
-23.83%
COMBINED SIZES:
$ 3,648,500
$12,193,000
3.93%
$ 143,294.59
$ 114,516.09
100.0%
$ 114,516.09
$ 431,733.86
3.14%
3.54%
1 -0.79%
-20.08%
OFFSITE INSPECTION Percentage of
$
$
$
0.00%
0.00%
0.00%
77 Engineer's Construction Security Worksheet:
78 Small project: Example Size = $ 102,000
$ 102,000
$ 612,000
4.31%
$ 4,392.33
$ 5,171.00
100.0%
$ 5,171.00
$ 31,026.00
5.07%
5.07%
0.76%
17.73%
79 Medium project: Example Size = $ 497,500
$ 497,500
$ 1,492,500
3.98%
$ 19,796.95
$ 21,301.67
100.0%
$ 21,301.67
$ 63,905.01
4.28%
4.28%
0.30%
7.60%
80 Large project: Example Size = $4,200,000
$ 4,200,000
$ 8,400,000
3.90%
$ 164,008.36
$ 120,993.79
100.0%
$ 120,993.79
$ 241,987.58
2.88%
2.88%
-1.02%
-26.23%
COMBINED SIZES:
$ 4,799,500
$10,504,500
3.92%
$ 188,197.65
$ 147,466.46
100.0%
$ 147,466.46
$ 336,918.59
3.07%
3.21%
-0.85%
-21.640/6
CONSOLIDATED ON/OFF-SITE
$ 8,448,000
$ 22,697,500
3.92%
$ 331,492
$ 261,983
100.0%
$ 261,983
$ 768,652
3.10%
3.39%
-0.82%
-20.97%
INSPECTION:
84 PARKS AND LANDSCAPE MAINTENANCE:
,06
-
$ -
0.00%
0.00%
0.00%
PARKS & MAINTENANCE INSPECTION
Percentage of Engineer's Construction Security
$ -
$ -
$ -
0.00%
0.00%
0.00%
85 Worksheet:
86 Small project: Example Size = $ 50,000
$ 50,000
$ 100,000
6.90%
$ 3,451.55
$ 12,468.32
100.0%
$ 12,468.32
$ 24,936.64
24.94%
24.94%
18.03%
261.24%
87 Medium project: Example Size = $ 200,000
$ 200,000
$ 400,000
2.77%
$ 5,539.25
$ 34,559.63
100.0%
$ 34,559.63
$ 69,119.26
17.28%
17.28%
14.51%
523.90%
88 Large project: Example Size = $ 750,000
$ 750,000
$ 375,000
1.14%
$ 8,576.13
$ 62,321.50
100.0%
$ 62,321.50
$ 31,160.75
8.31%
8.31%
7.17%
626.69%
COMBINED SIZES:
$ 1,000,000
$ 875,000
1.76%
$ 17,566.93
$ 109,349.45
100.0%
$ 109,349.45
$ 125,216.65
10.93%
14.31%
9.18%
522.47%
CONSOLIDATED ON/OFF-SITE & PARK
$ y 448 000
$ 23,572,500
3.69%
$ 349,059
$ 371,332
100.0%
$ 371,332
$ 893,869
3.93%
3.79%
0.24%
6.38°/6
INSPECTION:
Wohlford Consulting Appendix 3b - Page 2 of 3 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
LAND DEVELOPMENT
PERCENTAGE FEES DETERMINATION
(with Multiple Options)
Fee Service Information
Percents a Fee Calculations
Fee #
Fee Title
:Size Basis
mount
WEIGHTED
Combined
ize Basis
Current %
averse
Calculated
Current Fee
Full Cost
(from original
Fee Stud
Potential
Desired
Cost
Recovery
Original
Proposed
Fee Level
WEIGHTED
Combined
Proposed Fee
Fee%at
Original
Proposed
Level
WEIGHTED
Fee % at
Proposed
Level
Gross %
Change
Relative %
Change
ON/OFF-SITE PLAN CHECK (if combined):
$ 16,896,000
$ 36,052,000
3.92%
$ 662,984
$ 618,411
100%
$ 618,411
$ 1,390,938
3.66%
3.86%
-0.26%
-6.72%
ON/OFF-SITE INSPECTION (if combined):
3.86%
PARKS & LANDSCAPE PLAN CHECK (if
combined):
$ 2,000,000
$ 1,750,000
2.72%
$ 54,459
$ 154,242
100%
$ 154,242
$ 178,528
7.71%
10.20%
4.99%
183.23%
PARKS & LANDSCAPE INSPECTION (if
combined):
10.20%
ALL PLAN CHECK COMBINED (ON/OFF &
PARKS) (if combined)::
$ 18,896,000
$ 37,802,000
3.80%
$ 717,443
$ 772,653
100%
$ 772,653
$ 1,569,467
4.09%
4.15%
0.29%
7.70%
ALL INSPECTION COMBINED (ON/OFF &
PARKS) (if combined):
4.15%
Wohlford Consulting Appendix 3b - Page 3 of 3 September 28, 2023
2023 Full Cost of Services (User Fee) Study
FINAL REPORT
APPENDIX 4:
COST RESULTS FOR FIRE PREVENTION
The follow pages contain a summary of the results from the analysis of Fire Prevention Bureau fee services.
Wohlford Consulting Appendix 4 - Final Results September 27, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
COST AND REVENUE
SUMMARY
Fee Service Areas
Fee Area
Miscellaneous Fire
Fire Construction
TOTALS:
Full Cost Results Annual - All Services
Projected
Annual
Annual
Revenue at
Revenue
Full Cost
Current Fee /
Annual Full
Surplus /
Recovery
Deposit
Cost
(Subsidy)
Rate
$ 1,396,851
$ 4,569,922
$ (3,173,070)
31%
$ 383,361
$ 650,358
$ (266,996)
59%
$ 1,780,213
$ 5,220,280
1 $ 3,440,067
34%
Revenue Totals
Potential Revenue Results Fee Services Only)
Projected
Projected
Annual
Annual
Annual
Revenue at
Revenue at
Revenue
Full Cost
Current Fee /
Full Cost per
Surplus /
Recovery
Deposit
Unit
(Subsidy)
Rate
$ 1,396,851
$ 4,510,473
$ (3,113,622)
31 %
$ 383,361
$ 650,358
$ (266,996)
59 %
$ 1,780,213
$ 5,160,831
1 $ 3,380,618
34%
Revenue Totals
Potential Revenues
Potential
Revenue at
Current Fees
Potential
Revenue at
Rec'd Fees
Potential
Revenue
Growth /
(Decline)
Rate of
Change
$ 1,396,851
$ 4,510,473
$ 3,113,622
223%
$ 383,361
$ 650,358
$ 266,996
70 %
$ 1,780,213
$ 5,160,831
1 $ 3,380,618
190
Revenue Totals
Wohlford Consulting Appendix 4a - Page 1 of 1 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
1 MISCELLANEOUS FIRE FEES:
-
$ -
$ -
$
0%
$
$
$
0%
2 Sprinkler Plan Check New 1- 50 heads
3.0 3.0
$ 699.90
$ 949.95
$ (250.05)
74%
$
$
$
0%
3 Sprinkler Plan Check New 51-100
3.0 3.0
$ 699.90
$ 1,098.31
$ (398.41)
64%
$
$
$
0%
4 Sprinkler Plan Check New 101-200
10.0 10.0
$ 921.61
$ 1,230.53
$ (308.92)
75%
$
$
$
0%
5 Sprinkler Plan Check New 201-300
10.0 10.0
$ 921.61
$ 1,328.36
$ (406.75)
69%
$
$
$
0%
6 Sprinkler Plan Check New 301-400
5.0 5.0
$ 1,142.13
$ 1,571.05
$ (428.92)
73%
$
$
$
0%
7 Sprinkler Plan Check New401-500
5.0 5.0
$ 1,142.13
$ 1,669.95
$ (527.82)
68%
$
$
$
0%
8 9
Sprinkler Plan Check New - each additional
50 heads, or portion thereof, above 500
iser
lReciuires a se arate new Permit
-
$ 699.90
$
$ 345.31
$
$ 354.59
203%
%
$
$ Al
$
$
0%
0%
10 Sprinkler Inspection New 1- 50 heads
3.0 3.0
$ 769.41
$ 563.00
$ 206.41
137%
$
$
$
0%
11 Sprinkler Inspection New 51-100
3.0 3.0
$ 769.41
$ 743.51
$ 25.90
103%
$
$
$
0%
12 Sprinkler Inspection New 101-200
10.0 10.0
$ 1,172.09
$ 832.71
$ 339.38
141%
$
$
$
0%
13 Sprinkler Inspection New 201-300
10.0 10.0
$ 1,172.09
$ 1,016.44
$ 155.65
115%
$
$
$
0%
14 Sprinkler Inspection New 301-400
5.0 5.0
$ 1,574.77
$ 1,060.83
$ 513.94
148%
$
$
$
0%
15 Sprinkler Inspection New 401-500
5.0 5.0
$ 1,574.77
$ 1,105.70
$ 469.07
142%
$
$
$
0%
16 Sprinkler Inspection New - each additional
50 heads, or portion thereof, above 500
-
-
$ 769.41
$ 234.75
$ 534.66
3280
$
$
$
0%
17 Sprinkler Inspection Each Additional Riser -
equires a separate new Permit
-
-
$ -
$ -
$ -
0%
$
0%
18 Sprinkler Plan Check Ti 1-10 heads
28.0 28.0
$ 370.32
$ 788.81
$ (418.49)
47%
$
$
$
0%
19 Sprinkler Plan Check Ti 11-50
40.0 40.0
$ 481.78
$ 838.27
$ (356.49)
57%
$
$
$
0%
20 Sprinkler Plan Check Ti 51-100
9.0 9.0
$ 699.90
$ 887.72
$ (187.82)
79%
$
$
$
0%
21 Sprinkler Plan Check Ti - each additional
50 heads, or portion thereof, above 100
9.0 9.0
$ 481.78
$ 241.20
$ 240.58
200%
$
$
$
0%
22 Sprinkler Inspection Ti 1-10
28.0 28.0
$ 473.39
$ 569.00
$ (95.61)
83%
$
$
$
0%
23 Sprinkler Inspection Ti 11-50
40.0 40.0
$ 672.33
$ 837.69
$ (165.36)
80%
$
$
$
0%
24 Sprinkler Inspection Ti 51-100
9.0 9.0
$ 874.87
$ 932.75
$ (57.88)
94%
$
$
$
0°/u
25 Sprinkler Inspection Ti - each additional 50
heads, or portion thereof, above 100
9.0 9.0
$ 672.33
$ 102.87
$ 569.46
654%
$
$
$
0°/u
Wohlford Consulting Appendix 4b - Page 1 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
26 Alarm Plan Check New 1-10
89.0 89.0
$ 481.78
$ 669.10
$ (187.32)
72%
$
$
$
$
$
0%
0%
27 Alarm Plan Check New 11-25
12.0 12.0
$ 699.90
$ 718.55
$ (18.65)
97%
$
28 Alarm Plan Check New 26-50
13.0 13.0
$ 699.90
$ 817.45
$ (117.55)
86%
$
$
$
0%
29 Alarm Plan Check New 51-75
2.0 2.0
$ 1,249.99
$ 965.81
$ 284.18
129%
$
$
$
0%
30 Alarm Plan Check New 76-100
2.0 2.0
$ 1,913.93
$ 1,110.25
$ 803.68
172%
$
$
$
0%
31 Alarm Plan Check New - each additional 25
units, or portion thereof, above 100
-
-
$ 699.90
$ 361.35
$ 338.55
194%
$
$
$
0%
32 Alarm Inspection New 1-10
89.0 89.0
$ 672.33
$ 668.34
$ 3.99
101%
$
$
$
0%
33 Alarm Inspection New 11-25
12.0 12.0
$ 971.95
$ 713.21
$ 258.74
136%
$
$
$
0°/0
34 Alarm Inspection New26-50
13.0 13.0
$ 971.95
$ 1,027.32
$ (55.37)
95%
$
$
$
0%
35 Alarm Inspection New51-75
2.0 2.0
$ 1,475.30
$ 1,117.06
$ 358.24
132%
$
$
$
0%
36 Alarm Inspection New76-100
2.0 2.0
$ 1,475.30
$ 1,476.04
$ (0.74)
100%
$
$
$
0%
37 Alarm Inspection New - each additional 25
units, or portion thereof, above 100
-
-
$ 971.95
$ 501.82
$ 470.13
194%
$
$
$
0%
38 Alarm Plan Check Ti 1-10
55.0 55.0
$ 481.78
$ 656.22
$ (174.44)
73%
$
$
$
0%
39 Alarm Plan Check Ti 11-25
12.0 12.0
$ 699.90
$ 705.68
$ (5.78)
99%
$
$
$
0%
40 Alarm Plan Check Ti 26-50
11.0 11.0
$ 699.90
$ 804.58
$ (104.68)
87%
$
$
$
0%
41 Alarm Plan Check Ti 51-75
1.0 1.0
$ 1,249.99
$ 952.94
$ 297.05
131%
$
$
$
0%
42 Alarm Plan Check Ti 76-100
1.0 1.0
$ 1,249.99
$ 1,051.85
$ 198.14
119%
$
$
$
0%
43 Alarm Plan Check Ti - each additional 25
units, or portion thereof, above 100
1.0 1.0
$ 699.90
$ 472.20
$ 227.70
148%
$
$
$
0%
44 Wireless Communicator Alarm Ti PC
89.0 89.0
$ 454.21
$ 516.62
$ (62.41)
88%
$
$
$
0%
45 Alarm Inspection Ti 1-10
55.0 55.0
$ 672.33
$ 659.33
$ 13.00
102%
$
$
$
0%
46 Alarm Inspection Ti 11-25
12.0 12.0
$ 971.95
$ 704.20
$ 267.75
138%
$
$
$
0%
47 Alarm Inspection Ti 26-50
11.0 11.0
$ 971.95
$ 1,018.31
$ (46.36)
95%
$
$
$
0%
48 Alarm Inspection Ti 51-75
1.0 1.0
$ 1,475.30
$ 1,108.05
$ 367.25
133%
$
$
$
0%
49 Alarm Inspection Ti 76-100
1.0 1.0
$ 1,475.30
$ 1,467.03
$ 8.27
101%
$
$
$
0%
50 Alarm Inspection Ti - each additional 25
units, or portion thereof, above 100
1.0 1.0
$ 971.95
$ 601.00
$ 370.95
162%
$
$
$
0%
51 Wireless Communicator Alarm Inspection
89.0 89.0
$ 201.34
$ 570.67
$ (369.33)
35%
$
$
$
0%
52 Underground Sprinkler Plan Check
6.0 6.0
$ 811.35
$ 888.16
$ (76.81)
91 %
$
$
$
0%
53 Underground Hydrants Plan Check
2.0 2.0
$ 811.35
$ 1,036.52
$ (225.17)
78%
$
$
$
0%
54 Underground Combo Plan Check
5.0 5.0
$ 1,033.07
$ 1,036.52
$ (3.45)
100%
$
$
$
0%
55 Underground Sprinkler Insp
6.0 6.0
$ 769.41
$ 908.67
$ (139.26)
85%
$
$
$
0%
56 Underground Hydrants Insp
2.0 2.0
$ 874.87
$ 1,046.02
$ (171.15)
84%
$
$
$
0%
57 Underground Combo Insp
5.0 5.0
$ 1,072.62
$ 1,042.80
$ 29.82
103%
$
$
$
0%
58 NFPA 13D Plan Check (Single
Family/Duplex)
250.0
250.0
$ 576.46
$ 797.30
$ (220.84)
72%
$
$
$
0%
59 NFPA 13R Plan Check (Multi-Family/3 or
more units)
72.0 72.0
$ 699.90
$ 986.37
$ (286.47)
71%
$
$
$
0%
60 NFPA 13D Inspection (Single
Family/Duplex)
250.0
250.0
$ 254.07
$ 767.74
$ (513.67)
33%
$
$
$
0%
61 NFPA 13R Inspection (Multi-Family/3 or
more units)
72.0 72.0
$ 769.41
$ 857.54
$ (88.13)
90%
$
$
$
0°/0
Wohlford Consulting Appendix 4b - Page 2 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
62 Hood & Duct Sys Plan Check (Per System)
15.0 15.0
$ 547.69
$ 658.17
$ (110.48)
83%
$
$
$
0%
63 Hood & Duct Sys Insp (Per System)
15.0 15.0
$ 378.71
$ 723.76
$ (345.05)
52%
$
$
$
0%
64 Fire Pumps Plan Check
1.0 1.0
$ 825.73
$ 1,170.40
$ (344.67)
71%
$
$
$
0%
65 Fire Pumps Insp
1.0 1.0
$ 1,290.73
$ 1,306.56
$ (15.83)
99%
$
$
$
0%
66 Spray Booth Plan Check (Per System)
5.0 5.0
$ 601.62
$ 832.27
$ (230.65)
72%
$
$
$
0%
67 Spray Booth Insp (Per System)
5.0 5.0
$ 738.25
$ 542.72
$ 195.53
136%
$
$
$
0%
68 FM200 Plan Check (Per System)
1.0 1.0
$ 560.88
$ 1,080.13
$ (519.25)
52%
$
$
$
0%
69 FM200 Inspection (Per System)
1.0 1.0
$ -
$ 872.26
$ (872.26)
0%
$
$
$
0%
70 -
-
$ -
$ -
$ -
0%
$
$
$
0%
71 Dry Chem Systems Plan Check (Per
System)
1.0 1.0
$ 384.70
$ 783.41
$ (398.71)
49%
$
$
$
0%
72 Dry Chem Systems Insp (Per System)
1.0 1.0
$ 378.71
$ 542.72
$ (164.01)
70%
$
$
$
0%
73 Co2 Systms Plan Check (Per System)
1.0 1.0
$ 607.62
$ 783.41
$ (175.79)
78%
$
$
$
0%
74 Co2 Systems Insp (Per System)
1.0 1.0
$ 749.03
$ 542.72
$ 206.31
138%
$
$
$
0%
75 Halogenated Extinguishing Systems Plan
Check
1.0 1.0
$ 655.55
$ 1,080.13
$ (424.58)
61%
$
$
$
0%
76 Halogenated Extinguishing Systems Insp
1.0 1.0
$ -
$ 542.72
$ (542.72)
0%
$
$
$
0%
77 -
-
$ -
$ -
$ -
0%
$
$
$
0%
78 Medical Gases Plan Check (Per System)
1.0 1.0
$ 498.56
$ 995.71
$ (497.15)
50%
$
$
$
0%
79 Medical Gases Insp (Per System)
1.0 1.0
$ 372.72
$ 826.43
$ (453.71)
45%
$
$
$
0%
80 -
-
$ -
$ -
$ -
0%
$
$
$
0%
81 UST Plan Check
2.0 2.0
$ 810.15
$ 995.71
$ (185.56)
81%
$
$
$
0%
82 UST Inspection
2.0 2.0
$ 1,249.99
$ 1,066.23
$ 183.76
117%
$
$
$
0%
83 AST Plan Check
2.0 2.0
$ 810.15
$ 995.71
$ (185.56)
81%
$
$
$
0%
84 AST Inspection
2.0 2.0
$ 1,249.99
$ 737.76
$ 512.23
169%
$
$
$
0%
85 Tank/Piping Removal Plan Check
1.0 1.0
$ 384.70
$ 583.67
$ (198.97)
66%
$
$
$
0%
86 Tank/Piping Removal Insp
1.0 1.0
$ 530.91
$ 634.61
$ (103.70)
84%
$
$
$
0%
87 Smoke Control System Plan Check
1.0 1.0
$ 920.41
$ 1,910.85
$ (990.44)
48%
$
$
$
0%
88 Smoke Control System Insp
1.0 1.0
$ 2,434.06
$ 1,770.82
$ 663.24
137%
$
$
$
0%
89 Dust Collection Plan Check
2.0 2.0
$ 711.88
$ 897.28
$ (185.40)
79%
$
$
$
0%
90 Dust Collection Insp
2.0 2.0
$ 430.24
$ 544.92
$ (114.68)
79%
$
$
$
0%
91 Industrial Ovens/Furnace Plan Check
-
-
$ 699.90
$ 897.28
$ (197.38)
78%
$
$
$
0%
92 Industrial Ovens/Furnace Insp
$ 421.86
$ 544.92
$ (123.06)
77%
$
$
$
0%
Wohlford Consulting Appendix 4b - Page 3 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Annual
PLAN
Annual
Department /
Department /
CHECK
INSPECTION
Division
Surplus /
Full Cost
Division
Surplus /
Full Cost
Revenue
Revenue
Current Fee /
Total Full
(Subsidy) per
Recovery
Current Fee /
Total Full
(Subsidy) per
Recovery
Fee #
Fee Title
Activity Level
Activity Level
Deposit
Cost per Unit
Unit
Rate
Deposit
Cost per Unit
Unit
Rate
Hazmat Chemical Classificaton 1-5
93 chemicals Plan Check
10.0 10.0
$ 149.81
$ 777.82
$ (628.01)
19%
$
$
$
0%
Hazmat Chemical Classificaton 6-15
94 chemicals Plan Check
5.0 5.0
$ 359.54
$ 990.60
$ (631.06)
36%
$
$
$
0%
Hazmat Chemical Classificaton 16-50
95 chemicals Plan Check
5.0 5.0
$ 1,198.45
$ 1,321.81
$ (123.36)
91%
$
$
$
0%
Hazmat Chemical Classificaton 51-100
96 chemicals Plan Check
5.0 5.0
$ 2,241.11
$ 1,628.66
$ 612.45
138%
$
$
$
0%
Hazmat Chemical Classificaton - each
additional 10 chemicals, or portion thereof,
97 above 100
2.0 2.0
$ 119.85
$ 596.43
$ (476.58)
20%
$
$
$
0%
Hazmat Chemical Classificaton 1-5
98 chemicals Insp
10.0 10.0
$ -
$ 516.62
$ (516.62)
0%
$
$
$
0%
Hazmat Chemical Classificaton 6-15
99 chemicals Insp
5.0 5.0
$
$ 619.42
$ (619.42)
0%
$
$
$
0%
Hazmat Chemical Classificaton 16-50
100
chemicals Insp
5.0 5.0
$
$ 827.51
$ (827.51)
0%
$
$
$
0%
Hazmat Chemical Classificaton 51-100
101
chemicals Insp
5.0 5.0
$
$ 1,157.88
$ (1,157.88)
0%
$
$
$
Hazmat Chemical Classificaton - each
additional 10 chemicals, or portion thereof,
)Oo/.
102
above 100
2.0 2.0
$
$ 471.75
$ (471.75)
0%
$
$
$
103
HPS Plan Check
10.0 10.0
$ 1,160.10
$ 1,549.52
$ (389.42)
75%
$
$
$
104
HPS Inspection
10.0 10.0
$ 587.24
$ 816.59
$ (229.35)
72%
$
$
$
105
-
$ -
$ -
$ -
0%
$
$
$
00/0
Minor Technical Report Review (1-10
106
Pages)
1.0 1.0
$ 485.37
$ 702.06
$ (216.69)
69%
$
$
$
0%
Major Technical Report Review (over 10
107
Pages)
1.0 1.0
$ 1,155.31
$ 1,150.58
$ 4.73
100%
$
$
$
0%
Adult Care Facility 6 or fewer clients
108
Inspection
3.0 3.0
$ 388.30
$ 610.00
$ (221.70)
64%
$
$
$
0%
109
Residential Care Facility Inspection
3.0 3.0
$ 388.30
$ 879.24
$ (490.94)
44%
$
$
$
0%
Large Family Day Care 9-14 children
110
Inspection
2.0 2.0
$ 388.30
$ 610.00
$ (221.70)
64%
$
$
$
0%
Small Family Day Care 8 or fewer children
111
Inspection
1.0 1.0
$ 116.25
$ 520.26
$ (404.01)
22%
$
$
$
0%
112
-
-
$ -
$ -
$ -
00/0
$
$
$
00/0
Wohlford Consulting Appendix 4b - Page 4 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Annual
PLAN
Annual
Department /
Department /
CHECK
INSPECTION
Division
Surplus /
Full Cost
Division
Surplus /
Full Cost
Revenue
Revenue
Current Fee /
Total Full
(Subsidy) per
Recovery
Current Fee /
Total Full
(Subsidy) per
Recovery
Fee #
Fee Title
Activity Level
Activity Level
Deposit
Cost per Unit
Unit
Rate
Deposit
Cost per Unit
Unit
Rate
113
OTHER FEES:
EL
$ -
$
$
$
$
0%
$
$
$
$
0%
114
Administrative Fee
-
$ -
0%
$
$
0%
115
Plan Revision Fee (1st Hour)
122.0
122.0
$ 260.06
$ 318.59
$ (58.53)
82%
$
$
$
0%
Plan Revision Fee (ea addtl. 1/2 Hour or
116
portion thereof)
5.0 5.0
J $ 87.49
$ 228.85
$ (141.36)
38%
$
$
$
00/0
Plan resubmittal: fee charged on 4th and
117
each subsequent submittal
5.0 5.0
$ 260.06
$ 318.05
$ (57.99)
82%
$
$
$
0%
Re -Check Fee: Charged when project is not
completed or cannot be approved during
118
regular Plan Check Services
-
-
$ -
$ 333.18
$ (333.18)
0%
$
$
$
0%
Re -inspection fee: Charged when project is
not completed or cannot be approved during
119
regular inspection
7.0 7.0
$ -
$ 333.18
$ (333.18)
0%
$
$
$
0%
Penalty for Failure to Cancel Scheduled
120
Inspection & No Show
12.0 12.0
$ 143.81
$ 365.72
$ (221.91)
39%
$
$
$
0%
121
Job Card Reprint Fee
12.0 12.0
$ 41.95
$ 13.36
$ 28.59
314%
$
$
$
0%
Hot Works (Actual Time at Staff Hourly
122
Rates) - Calculated cost is potential deposit.
2.0 2.0
$ 280.44
$ 682.39
$ (401.95)
41 %
$
$
$
0%
123
-
-
$ -
$ -
$
0%
$
$
$
0%
124
$ -
$ -
$
00/0
$
$
$
00/0
Wohlford Consulting Appendix 4b - Page 5 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
125
ANNUAL INSPECTION PROGRAM FEES:
$
$
0%
$
$
$
0%
126
A-1 Occupancies up to 10,000 sq ft
50.0 50.0
$
$ 471.78
$ (471.78)
0%
$
$
$
0%
127
A-1 Occupancies each additional 10,000 sq
ft, or portion therof
22.0 22.0
$
$ 97.75
$ (97.75)
0%
$
$
$
0%
128
A-2 Occupancies up to 10,000 sq ft
323.0
323.0
$
$ 619.04
$ (619.04)
0%
$
$
$
0%
129
A-2 Occupancies each additional 10,000 sq
ft, or portion therof
150.0
150.0
$
$ 97.75
$ (97.75)
0%
$
$
$
0%
130
A-3 Occupancies up to 10,000 sq ft
50.0 50.0
$
$ 663.92
$ (663.92)
0%
$
$
$
0%
131
A-3 Occupancies each additional 10,000 sq
ft, or portion therof
25.0 25.0
$
$ 97.75
$ (97.75)
0%
$
$
$
0%
132
A-4 Occupancies up to 10,000 sq ft
10.0 10.0
$
$ 501.22
$ (501.22)
0%
$
$
$
0%
133
A-4 Occupancies each additional 10,000 sq
ft, or portion therof
10.0 10.0
$
$ 97.75
$ (97.75)
0%
$
$
$
0%
134
A-5 Occupancies up to 50,000 sq ft
5.0 5.0
$
$ 681.44
$ (681.44)
0%
$
$
$
0%
135
A-5 Occupancies each additional 10,000 sq
ft, or portion therof
11.0 11.0
$
$ 97.75
$ (97.75)
0%
$
$
$
0%
136
-
-
$
$ -
$ -
0%
$
$
$
0%
137
E Occupancies Schools - Elementary
11.0 11.0
$
$ 1,069.17
$ (1,069.17)
0%
$
$
$
0%
138
E Occupancies Schools - Middle
5.0 5.0
$
$ 2,146.19
$ (2,146.19)
0%
$
$
$
0%
139
E Occupancies Schools - High
4.0 4.0
$
$ 3,223.22
$ (3,223.22)
0%
$
$
$
0%
140
E Occupancies Schools - Private
25.0 25.0
$
$ 1,158.92
$ (1,158.92)
0%
$
$
$
0%
141
-
-
$
$ -
$ -
0%
$
$
$
0%
142
1 Occupancy - up to 10,000 square feet
-
-
$
$ 636.51
$ (636.51)
0%
$
$
$
0%
143
I Occupancy - each additional 10,000 sq ft,
or portion therof
1.0 1.0
$
$ 97.75
$ (97.75)
0%
$
$
$
0%
144
-
-
$
$ -
$ -
0%
$
$
$
0%
145
B or M Occupancies - up to 3,600 sq ft
1,200.0
1,200.0
$
$ 412.18
$ (412.18)
0%
$
$
$
0%
146
B or M Occupancies - 3,601 - 50,000 sq ft
10.0 10.0
$
$ 681.44
$ (681.44)
0%
$
$
$
0%
147
B or M Occupancies - 50,001 - 350,000 sq ft
1.0 1.0
$
$ 816.07
$ (816.07)
0%
$
$
$
0%
148
B or M Occupancies - each additional
50.000 sq ft, or portion therof
-
-
$
$ 322.10
$ (322.10)
0%
$
$
$
0%
149
-
-
$
$ -
$ -
0%
$
$
$
0%
150
F or S Occupancies - up to 3,600 sq ft
300.0
300.0
$
$ 455.80
$ (455.80)
0%
$
$
$
0%
151
F or S Occupancies - 3,601 - 50,000 sq ft
267.0
267.0
$
$ 681.44
$ (681.44)
0%
$
$
$
0%
152
F or S Occupancies - 50,001 - 350,000 sq ft
5.0 5.0
Lj $
$ 816.07
$ (816.07)
0%
$
$
$
0%
153
F or S Occupancies - each additional
50.000 sq ft, or portion therof
5.0 5.0
$
$ 375.00
$ (375.00)
0%
$
$
$
0%
154
-
-
$
$ -
$ -
0%
$
$
$
0%
155
H Occupancies - up to 10,000 sq It
8.0 9.0
$
$ 606.05
$ (606.05)
0%
$
$
$
0%
156
H Occupancies - each additional 10,000 sq
ft, or portion therof
8.0 8.0
$
$ 232.37
$ (232.37)
0%
$
$
$
0%
Wohlford Consulting Appendix 4b - Page 6 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
157
$
$ -
$
0%
$
$
$
$
0%
0%
158
High Rise - greater than 75 feet from grade
(Prohibited by City Ordinance)
$
$ 1,399.33
$ (1,399.33)
0%
$
$
159
$
$ -
$ -
0%
$
$
$
0%
160
L Occupancies
17.0 17 00
$
$ 606.05
$ (606.05)
0%
$
$
$
0%
161
-
-
$
$ -
$ -
0%
$
$
$
0%
162
R-1 Occupancies - first 25 units
1.0 1.0
$
$ 410.93
$ (410.93)
0%
$
$
$
0%
163
R-1 Occupancies - 26-50 units
2.0 2.0
$
$ 576.07
$ (576.07)
0%
$
$
$
0%
164
R-1 Occupancies - 51-75 units
4.0 4.0
$
$ 710.70
$ (710.70)
0%
$
$
$
0%
165
R-1 Occupancies - 76-100 units
4.0 4.0
$
$ 845.33
$ (845.33)
0%
$
$
$
0%
166
R-1 Occupancies - each additional 25 units
6.0 6.0
$
$ 142.62
$ (142.62)
0%
$
$
$
0%
167
-
-
$
$ -
$
0%
$
$
$
0%
168
-
-
$
$ -
$
0%
$
$
$
0%
169
R-2 Occupancies - 1-5 Buildings
14.0 14.0
$
$ 426.54
$ (426.54)
0%
$
$
$
0%
170
R-2 Occupancies - 6-10 Buildings
8.0 8.0
$
$ 591.69
$ (591.69)
0%
$
$
$
0%
171
R-2 Occupancies - 11-15 Buildings
8.0 8.0
$
$ 726.32
$ (726.32)
0%
$
$
$
0%
172
R-2 Occupancies - 16-20 Buildings
8.0 8.0
$
$ 860.94
$ (860.94)
0%
$
$
$
0%
173
R-2 Occupancies - 21-30 Buildings
7.0 7.0
$
$ 995.57
$ (995.57)
0%
$
$
$
0%
174
R-2 Occupancies - 30-50 Buildings
3.0 3.0
$
$ 1,130.20
$ (1,130.20)
0%
$
$
$
0%
175
R-2Occupancies ->50Buildings
3.0 3.0
$
$ 1,399.46
$ (1,399.46)
0%
$
$
$
0%
176
-
-
$
$ -
$ -
0%
$
$
$
0%
177
Re -inspection fee (after initial and first
inspection)
1,814.0
1,814.0
$
$ 299.66
$ (299.66)
0%
$
$
$
0%
178
-
-
$
$ -
$ -
00/0
$
$
$
00/0
Wohlford Consulting Appendix 4b - Page 7 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
179
ANNUAL INSPECTION AND OPERATING
PERMITS (IFC 105 PERMITS) -Add-on
Fees to the Annual Inspection Program
Fee:
$
$ -
$ -
0%
$
$ -
$
180
Combustible Dust Producing Operation
125.0
125.0
$ 95.88
$ 281.80
$ (185.92)
34%
$
$
$
0%
181
Fire hydrants and Valves
2,500.0
2,500.0
$ 95.88
$ 281.80
$ (185.92)
34%
$
$
$
0%
182
Hot Works Permit
300.0
300.0
$ 95.88
$ 236.92
$ (141.04)
40%
$
$
$
0%
183
Lumberyard
3.0 3.0
$ 95.88
$ 281.80
$ (185.92)
34%
$
$
$
0%
184
Industrial Ovens
5.0 5.0
$ 95.88
$ 236.92
$ (141.04)
40%
$
$
$
0°/u
185
Liquid or gas fueled vehicles or euipment in
assembly buildings
10.0 10.0
$ 95.88
$ 251.28
$ (155.40)
38%
$
$
$
0%
186
Outdoor assembly event
10.0 10.0
$ 95.88
$ 371.55
$ (275.67)
26%
$
$
$
0%
187
Cutting and/or Welding
100.0
100.0
$ 95.88
$ 251.28
$ (155.40)
38%
$
$
$
0%
188
Temporary membrane structures and tents
100.0
100.0
$ 95.88
$ 371.55
$ (275.67)
26%
$
$
$
0%
189
Aircraft refueling Vehicle/Avation Facilities
-
-
$ 95.88
$ 251.26
$ (155.38)
38%
$
$
$
0%
190
Chapter 48
5.0 5.0
$ 95.88
$ 770.24
$ (674.36)
12%
$
$
$
0%
191
Aerosol Products
75.0 75.0
$ 95.88
$ 233.74
$ (137.86)
41%
$
$
$
0°/u
192
Cellulose Nitrate Film
2.0 2.0
$ 95.88
$ 236.90
$ (141.02)
40%
$
$
$
0%
193
Combustible Fiber Storage
10.0 10.0
$ 95.88
$ 281.77
$ (185.89)
34%
$
$
$
0%
194
Compressed Gases
50.0 50.0
$ 95.88
$ 251.26
$ (155.38)
38%
$
$
$
0%
195
Cryogenic Fluids
10.0 10.0
$ 95.88
$ 251.26
$ (155.38)
38%
$
$
$
0%
196
Explosives 105.6.15
5.0 5.0
$ 95.88
$ 281.77
$ (185.89)
34%
$
$
$
0%
197
Pyrotechnic Special Effects material
50.0 50.0
$ 95.88
$ 1,203.27
$ (1,107.39)
8%
$
$
$
0%
198
Flammable and Combustible Liquids
350.0
350.0
$ 95.88
$ 326.64
$ (230.76)
29%
$
$
$
0%
199
Hazardous Materials
500.0
500.0
$ 95.88
$ 326.64
$ (230.76)
29%
$
$
$
0%
200
High Piled Storage
350.0
350.0
$ 95.88
$ 371.52
$ (275.64)
26%
$
$
$
0%
201
Amusement Building
-
-
$ 95.88
$ 576.32
$ (480.44)
17%
$
$
$
0%
202
Carnival and Fairs
2.0 2.0
$ 95.88
$ 576.32
$ (480.44)
17%
$
$
$
0%
203
Exhibits and Trade Shows
5.0 5.0
$ 95.88
$ 576.32
$ (480.44)
17%
$
$
$
0%
204
Waste Handling
50.0 50.0
$ 95.88
$ 236.90
$ (141.02)
40%
$
$
$
0%
205
-
-
$ -
$ -
$
0%
$
$
$
0%
206
-
$ -
$ -
$
0%
$
$
$
0%
Wohlford Consulting Appendix 4b - Page 8 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
207
FULL COST RECOVERY RATES
(HOURLY STAFF RATES:
$
$
$
$
0%
0%
$
$
$
$
$
$
0%
00/0
208
Service in Excess of Standard (per hour @
staff hourly rates and at the discretion of the
Chief or Fire Marshal)
$
$
209
Plan Checks Other Than Those Already
Listed (per hour @ staff hourly rates)
$
$
$
0%
$
$
$
0%
210
Inspections Other Than Those Already
Listed (per hour @ staff hourly rates)
$
$
$
0%
$
$
$
00/0
211
Endividual Staff Hourly Rates:
$ -
$
%
$
0%
212
Assistant Fire Marshal (per hour)
$ 180.97
$ 211.46
$ (30.49)
86%
$
$
$
0%
213
Fire Safety Specialist (per hour)
$ 106.66
$ 197.81
$ (91.15)
54%
$
$
$
0%
214
Fire Plan Check - (per hour)
$ 99.47
$ 179.49
$ (80.02)
55%
$
$
$
0%
215
Fire Inspection (per hour)
$ 99.47
$ 179.49
$ (80.02)
55%
$
$
$
0%
216
Community Development Tech. (per hour)
$ 99.47
$ 160.91
$ (61.44)
62%
$
$
$
0%
217
Adminstrative Assistant (per hour)
$ 99.47
$ 158.42
$ (58.95)
63%
$
$
$
0%
218
$ -
$ -
$
0%
$
$
$
0%
219
NON -FEE ACTIVITIES (annual):
$
$ -
$ -
0%
$
$
$
0%
220
Counter / General Assistance: Pre -Project
Support (annual)
1.0 $
$ 15,941.43
$ (15,941.43)
0%
$
$
$
0%
221
Counter / General Assistance: Public
Information - not recoverable (annual)
1.0 $
$ 17,699.73
$ (17,699.73)
0%
$
$
$
0%
222
Public Education (annual)
1.0 $
$ 8,073.10
$ (8,073.10)
0%
$
$
$
0%
223
Special Events (annual)
1.0 $
$ 7,268.56
$ (7,268.56)
0%
$
$
$
0%
224
Other Specialized Training (annual)
1.0 $
$ 9,859.73
$ (9,859.73)
0%
$
$
$
0%
225
Other Non -Fee Services (annual)
1.0 $
$ -
$
0%
$
$
$
0%
226
SUPPPORT TO OTHER DEPARTMENTS I
DIVISIONS - General (annual):
-
$
$
0%
$
$
$
0°/0
227
N/A
$
$
$
0%
$
$
$
0%
228
$
$
$
0%
$
$
$
0%
229
$
$
$
0%
$
$
$
0%
230
$
$
$
0%
$
$
$
0%
231
$
$
$
0%
$
$
$
0%
232
$
$
$
0%
$
$
$
0%
233
$
$
$
0%
$
$
$
0%
234
$
$
$
0%
$
$
$
0%
235
$
$
$
0%
$
$
$
0%
236
$
$
$
0%
$
$
$
0%
237
$
$
$
0%
$
$
$
0%
238
END OF FIRE ACTIVITIES
$
0%
$
%
Wohlford Consulting Appendix 4b - Page 9 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
239
CONTRIBUTIONS TO PLANNING FEES:
$ -
$
$ -
0%
$
$
$
0%
240
Adult Business
$
$
0%
$
$
$
0%
241
Adult Business - Conditional Use Permit
$
$ 140.35
$ (140.35)
0%
$
$
$
0%
242
Adult Business - Employee Permit
$
$ 122.65
$ (122.65)
0%
$
$
$
0%
243
Adult Business - Owner Permit
$
$ 122.65
$ (122.65)
0%
$
$
$
0%
244
Annexation
$
$ -
$
0%
$
$
$
0%
245
Annexation / Detachment (Actual Time @
Staff Cost Recovery Hourly Rates)
[calculated cost is the potential deposit]
$
$
$
0%
$
$
$
0%
246
Pre -Annexation Agreement (Actual Time @
Staff Cost Recovery Hourly Rates)
[calculated cost is the potential deposit]
$
$
$
0%
$
$
$
0%
247
Appeal
$
$ -
$ -
0%
$
$
$
0%
248
Appeal
$
$
$
0%
$
$
$
0%
249
Bingo License
$
$ -
$ -
0%
$
$ -
$ -
0%
250
Bingo License
$
$
$
0%
$
$
$
0%
251
$
$
$
0%
$
$
$
0%
252
CEQA L
$
$
$
00/0
$
$
$
0%
253
Negative Declaration (Without Mitigation)
$
$ 140.35
$ (140.35)
0%
$
$
$
0%
254
Negative Declaration (With Mitigation)
$
$ 140.35
$ (140.35)
0%
$
$
$
0%
255
City Managed EIR
$
$ 573.71
$ (573.71)
0%
$
$
$
0%
256
Supplemental EIR
$
$ 309.38
$ (309.38)
0%
$
$
$
0%
257
Addendum to EIR
$
$ 309.38
$ (309.38)
0%
$
$
$
0%
258
Certificate Of Historical Appropriateness
$
$ -
$ -
0%
$
$
$
0%
259
Certificate Of Historical Appropriateness
$
$
$
0%
$
$
$
0%
260
$
$
$
0%
$
$
$
0%
261
Conditional Use Permits
$
$
$
0%
$
$
$
0°/u
262
Conditional Use Permit - No Site Changes
$
$ 169.54
$ (169.54)
0%
$
$
$
0%
263
Conditional Use Permit with Development
Plan
$
$ 296.42
$ (296.42)
0%
$
$
$
0%
264
Conditional Use Permit - Large Family Day
Care
$
$ 148.39
$ (148.39)
0%
$
$
$
0%
265
CUP - Modification of Existing CUP
$
$ 148.39
$ (148.39)
0%
$
$
$
0%
266
CC&R Review
$
$ -
$
0%
$
$
$
0%
267
CC&R Review (staff)
$
$ 122.65
$ (122.65)
0%
$
$
$
0%
268
Development Agreement JL
$
$ -
$
0%
$
$
$
0%
269
Development Agreement - New
$
$ 166.79
$ (166.79)
0%
$
$
$
0%
270
Development Agreement - Modification
$
$ 148.39
$ (148.39)
0%
$
$
$
0%
271
$
$ -
$
0%
$
$
$
0%
272
273
Development Plan
Development Plan - Larger than 100,000 SF
$
$
$
$ 296.42
$ (296.42)
0%
0%
$
$
$
$
$
$
0%
0%
274
Development Plan - 10,000-100,000 SF
It
$ 275.27
$ (275.27)
0%
$
$
$
0%
Wohlford Consulting Appendix 4b - Page 10 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
275
Development Plan -Less than 10,000 SF
$
$ 169.54
$ (169.54)
0%
$
$
$
0%
276
DIF Credit Or Reduction
$ -
$ -
$ -
0%
$
$ -
$ -
0%
277
DIF Credit Or Reduction
$
$
$
0%
$
$
$
0%
278
$
$
$
0%
$
$
$
0%
279
Extension of Time
$
$
$
0%
$
$
$
00/0
280
Extension Of Time
$
$ 169.54
$ (169.54)
0%
$
$
$
0%
281
$
$ -
$
0%
$
$
$
0%
282
Finding of Public Convenience Or
Necessity
Is
$
$
0%
$
$
$
0%
283
Finding Of Public Convenience or Necessity
(without DP or CUP)
$
$
$
0%
$
$
$
0%
284
Finding Of Public Convenience & or
Necessity with DP or CUP
$
$
$
0%
$
$
$
0%
285
General Plan Amendment
$
$ -
$ -
0%
$
$ -
$ -
0%
286
General Plan Amendment - Text Or Exhibit
$
$ 765.87
$ (765.87)
0%
$
$
$
0%
287
General Plan Amendment - Zoning & and/or
Land Map
$
$ 501.54
$ (501.54)
0%
$
$
$
0%
288
General Plan Amendment with Fiscal
mpact Analysis [DELETE]
$
$
0%
$
$
$
0%
289
Fiscal Impact Analysis (City Staff fee in
addition to external contractor cost) [NEW]
$
$
$
0%
$
$
$
0%
290
Landscape Construction Plan
$
$ -
0%
$
$
$
0%
291
Landscape Construction Plan (City
administration and processing fee --in
addition to consultant review fee charged
directly to applicant)
$
$
$
0%
$
$
$
0%
292
Maps
$
$
$
0%
$
$
$
0%
293
Certificate Of Compliance (support to Public
Works fee)
$
$
$
0%
$
$
$
0%
294
Condominium Conversion
$
$
$
0%
$
$
$
0%
295
Condominium Map
$
$ 205.49
$ (205.49)
0%
$
$
$
0%
296
Lot Line Adjustment (support to Public
Works fee)
$
$ 95.53
$ (95.53)
0%
$
$
$
0%
297
Minor Change To Approved Tentative Map
$
$ 201.26
$ (201.26)
0%
$
$
$
0%
298
Parcel Merger (support to Public Works fee)
$
$ 148.39
$ (148.39)
0%
$
$
$
0%
299
Phasing Plan For Tentative Map
$
$ 378.26
$ (378.26)
0%
$
$
$
0%
300
Reversion To Acreage
$
$ -
$ -
0%
$
$
$
0%
301
TPM Commercial Industrial Standard
$
$ 465.59
$ (465.59)
0%
$
$
$
0%
302
TPM Commercial Industrial with Waiver
$
$ -
$ -
0%
$
$
$
0%
303
TPM Residential Standard
$
$ 359.86
$ (359.86)
0%
$
$
$
0%
304
TPM Residential wth Waiver- Final Map
$
$ -
$
0%
$
$
$
0%
305
TPM Revised
$
$
$
0%
$
$
$
0%
306
TPM Vesting
$
$
$
0%
$
$
$
0%
Wohlford Consulting Appendix 4b - Page 11 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
307
TTM Standard - 5-34 Lots/Units (flat fee)
$
$ -
$ -
0%
$
$
$
$
$
0%
308
TTM Standard 35+ units / lots
$
$ 272.52
$ (272.52)
0%
$
0%
309
TTM Standard - Additional Unit Fee per lot
above 35 lots
$
$ 219.66
$ (219.66)
0%
$
$
$
0%
310
TTM Standard Revised Map
$
$ 272.52
$ (272.52)
0%
$
$
$
0%
311
TTM Vesting 5 - 34 lots/units (flat fee)
$
$ -
$ -
0%
$
$
$
0%
312
TTM Vesting 35+ units / lots
$
$ 325.39
$ (325.39)
0%
$
$
$
0%
313
TTM Vesting - Additional Unit Fee per lot
above 35 lots
$
$ 219.66
$ (219.66)
0%
$
$
$
0%
314
TTM Vesting Revised Map
$
$ 219.66
$ (219.66)
0%
$
$
$
0%
315
$
$ -
$
0%
$
$
$
0%
316
Massage Permits
$
$
$
0%
$
$
$ -
0%
317
Massage Establishment Permit
$
$
$
0%
$
$
$
0%
318
Massage Establishment Permit Renewal
$
$
$
0%
$
$
$
0%
319
'FAassage Technician License [This service
now a state responsibility.]
$
$
0%
$
0%
320
$
$
$
00/0
$
$
$
0%
321
Minor Exception
$
$ -
$ -
0%
$
$
$
0%
322
Minor Exception - General
$
$
$
0%
$
$
$
00/0
323
Minor Exception - Individual Homeowner
$
$
$
0%
$
$
$
0%
324
Modifications
$ -
$
$
0%
$
$
$
00/0
325
Major Modification
$
$ 275.27
$ (275.27)
0%
$
$
$
0%
326
Minor Modification
$
$ 169.54
$ (169.54)
0%
$
$
$
0%
327
Minor Modification - Plan Review Only
$
$ 271.68
$ (271.68)
0%
$
$
$
0%
328
Minor Modification - Plan Review Only
(Individual Homeowner)
$
$ 158.97
$ (158.97)
0%
$
$
$
0%
329
r Municipal Code Amendment
$
$
$
0%
$
$
$
0%
330
Municipal Code Amendment
$
$
$
0%
$
$
$
0%
331
Planned Development Overlay
$
$
$
0%
$
$
$
0%
332
Planned Development Overlay
$
$ 359.86
$ (359.86)
0%
$
$
$
0%
333
Planned Development Overlay -
Amendment
$
$ 254.13
$ (254.13)
0%
$
$
$
0%
334
Residential Tract Home Product Review
$
$ -
$ -
0%
$
$
$
0%
335
Residential Tract Home Product Review
$
$ 483.99
$ (483.99)
0%
$
$
$
0%
336
Accessory Dwelling Unit
$
$ -
$ -
0%
$
$
$
0%
337
Accessory Dwelling Unit
$
$ 254.13
$ (254.13)
0%
$
$
$
0%
338
$
$ -
$
0%
$
$
$
0%
339
Signage
$
$
$
0%
$
$
$
0%
340
Sign Program Amendment
$
$
$
0%
$
$
$
0%
341
Sign Program - New
$
$
$
0%
$
$
$
0%
342
$
$
$
0%
$
$
$
0%
343
Specific Plan
$
$
$
0%
$
$
$
0%
344
Specific Plan - New
$
$ 924.47
$ (924.47)
0%
$
$
$
0%
345
Specific Plan Amendment - Major
$
$ 713.00
$ (713.00)
0%
$
$
$
0%
346
Specific Plan Amendment - Minor
hk
$ 924.47
$ (924.47)
0%
$
$
$
0%
Wohlford Consulting Appendix 4b - Page 12 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Annual
PLAN
Annual
Department /
Department /
CHECK
INSPECTION
Division
Surplus /
Full Cost
Division
Surplus /
Full Cost
Revenue
Revenue
Current Fee /
Total Full
(Subsidy) per
Recovery
Current Fee /
Total Full
(Subsidy) per
Recovery
Fee #
Fee Title
Activity Level
Activity Level
Deposit
Cost per Unit
Unit
Rate
Deposit
Cost per Unit
Unit
Rate
347
$ -
$ -
$
0%
$ -
$ -
$
0%
Wohlford Consulting Appendix 4b - Page 13 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS FIRE ITEMS
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Total Full
Cost per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
348
Temporary Use Permits
$
$ -
$
0%
$
$
$
0%
0%
349
Temporary Use Permit - Minor Regular
$
$ 107.62
$ (107.62)
0%
$
$
$
350
Temporary Use Permit - Major Regular
$
$ 143.57
$ (143.57)
0%
$
$
$
0%
351
Temporary Use Permit - Major Non Profit
$
$ 143.57
$ (143.57)
0%
$
$
$
0%
352
Temporary Use Permit - Minor Non Profit
$
$ 107.62
$ (107.62)
0%
$
$
$
0%
353
Temporary Use Permit - Model Home
Complex
$
$ 143.57
$ (143.57)
0%
$
$
$
0%
354
Temporary Use Permit - Sales /
Construction Trailer
$
$ 107.62
$ (107.62)
0%
$
$
$
0%
355
$
$ -
$
0%
$
$
$
0%
356
Variance
$
$
$
0%
$
$
$
0%
357
Variance
$
$
$
0%
$
$
$
0%
358
Vendors License
$
$
$
0%
$
$
$
00/0
359
Vendors License
$
$
$
0%
$
$
$
0%
360
$
$
$
0%
$
$
$
0%
361
Wireless Antenna Facility
$
$ -
$ -
0%
$
$ -
$ -
0%
362
Wireless Antenna Facility -Administrative
Review
$
$ 143.57
$ (143.57)
0%
$
$
$
0%
363
Wireless Antenna Facility - Revision with
Public Hearing
$
$ 460.55
$ (460.55)
0%
$
$
$
0%
364
Wireless Antenna Facility - New
$
$ 782.37
$ (782.37)
0%
$
$
$
0%
365
Zoning Letter
$
$ -
$ -
0%
$
$
$
0%
366
Zoning Letter
$
$ -
$
0%
$
$
$
0%
367
$
$
$
0%
$
$
$
0%
368
Other Fees
$
$
$
0%
$
$
$
0"/u
369
General Plan Update [DELETE]
$
$
$
0%
$
$
$
0%
370
Records Retention [DELETE]
$
$
$
0%
$
$
$
0%
371
IT/Software Update [DELETE]
$
$
$
0%
$
$
$
0%
372
Base Planning Review Fee [DELETE]
$
$
$
0%
$
$
$
0%
373
Excess Review Fee - 4th and subsequent
reviews - Actual Time at Staff Hourly Rates
$
$
$
0%
$
$
$
0%
374
Stockpiling Permit
$
$
$
0%
$
$
$
0%
375
$
$
$
0%
$
$
$
0%
Adjustment for Suballocated Costs:
$
$
$
0%
$
$
$
0%
TOTALS:
Wohlford Consulting Appendix 4b - Page 14 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service
Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
1 MISCELLANEOUS FIRE FEES:
$ -
$ -
$ -
0%
$
-
$
$ -
0%
$
-
$
$ -
0%
2 Sprinkler Plan Check New 1- 50 heads
$ 699.90
$ 949.95
$ (250.05)
74%
$
2,100
$ 2,850
$ (750)
74%
$
2,100
$ 2,850
$ (750)
74%
3 Sprinkler Plan Check New 51-100
$ 699.90
$ 1,098.31
$ (398.41)
64%
$
2,100
$ 3,295
$ (1,195)
64%
$
2,100
$ 3,295
$ (1,195)
64%
4 Sprinkler Plan Check New 101-200
$ 921.61
$ 1,230.53
$ (308.92)
75%
$
9,216
$ 12,305
$ (3,089)
75%
$
9,216
$ 12,305
$ (3,089)
75%
5 Sprinkler Plan Check New 201-300
$ 921.61
$ 1,328.36
$ (406.75)
69%
$
9,216
$ 13,284
$ (4,067)
69%
$
9,216
$ 13,284
$ (4,067)
69%
6 Sprinkler Plan Check New 301-400
$ 1,142.13
$ 1,571.05
$ (428.92)
73%
$
5,711
$ 7,855
$ (2,145)
73%
$
5,711
$ 7,855
$ (2,145)
73%
7 Sprinkler Plan Check New401-500
$ 1,142.13
$ 1,669.95
$ (527.82)
68%
$
5,711
$ 8,350
$ (2,639)
68%
$
5,711
$ 8,350
$ (2,639)
68%
8 9
10 Sprinkler Plan Check New - each additional
50 heads, or portion thereof, above 500
iser
e uires a separate new Permit
Sprinkler Inspection New 1- 50 heads
$ 699.90
$
$ 769.41
$ 345.31
$ 563.00
$ 354.59
$ 206.41
203%
%
137%
$
$
2,308
$
$ 1,689
$ -
$ 619
0%
137%
$
$
-
2,308
$ -
$ 1,689
$ -
$ 619
0%
137%
11 Sprinkler Inspection New 51-100
$ 769.41
$ 743.51
$ 25.90
103%
$
2,308
$ 2,231
$ 78
103%
$
2,308
$ 2,231
$ 78
103%
12 Sprinkler Inspection New 101-200
$ 1,172.09
$ 832.71
$ 339.38
141%
$
11,721
$ 8,327
$ 3,394
141%
$
11,721
$ 8,327
$ 3,394
141%
13 Sprinkler Inspection New 201-300
$ 1,172.09
$ 1,016.44
$ 155.65
115%
$
11,721
$ 10,164
$ 1,556
115%
$
11,721
$ 10,164
$ 1,556
115%
14 Sprinkler Inspection New 301-400
$ 1,574.77
$ 1,060.83
$ 513.94
148%
$
7,874
$ 5,304
$ 2,570
148%
$
7,874
$ 5,304
$ 2,570
148%
15 Sprinkler Inspection New 401-500
$ 1,574.77
$ 1,105.70
$ 469.07
142%
$
7,874
$ 5,529
$ 2,345
142%
$
7,874
$ 5,529
$ 2,345
142%
16 Sprinkler Inspection New - each additional
50 heads, or portion thereof, above 500
$ 769.41
$ 234.75
$ 534.66
328%
$
-
$ -
$ -
0%
$
-
$ -
$ -
0%
17 Sprinkler Inspection Each Additional Riser -
equires a separate new Permit
$ -
$ -
0%
$
-
$ -
$ -
0%
$
-
$ -
$ -
0°/0
18 Sprinkler Plan Check Ti 1-10 heads
$ 370.32
$ 788.81
$ (418.49)
47%
$
10,369
$ 22,087
$ (11,718)
47%
$
10,369
$ 22,087
$ (11,718)
47%
19 Sprinkler Plan Check Ti 11-50
$ 481.78
$ 838.27
$ (356.49)
57%
$
19,271
$ 33,531
$ (14,260)
57%
$
19,271
$ 33,531
$ (14,260)
57%
20 Sprinkler Plan Check Ti 51-100
$ 699.90
$ 887.72
$ (187.82)
79%
$
6,299
$ 7,989
$ (1,690)
79%
$
6,299
$ 7,989
$ (1,690)
79%
21 Sprinkler Plan Check Ti - each additional
50 heads, or portion thereof, above 100
$ 481.78
$ 241.20
$ 240.58
200%
$
4,336
$ 2,171
$ 2,165
200%
$
4,336
$ 2,171
$ 2,165
200%
22 Sprinkler Inspection Ti 1-10
$ 473.39
$ 569.00
$ (95.61)
83%
$
13,255
$ 15,932
$ (2,677)
83%
$
13,255
$ 15,932
$ (2,677)
83%
23 Sprinkler Inspection Ti 11-50
$ 672.33
$ 837.69
$ (165.36)
80%
$
26,893
$ 33,508
$ (6,614)
80%
$
26,893
$ 33,508
$ (6,614)
80%
24 Sprinkler Inspection Ti 51-100
$ 874.87
$ 932.75
$ (57.88)
94%
$
7,874
$ 8,395
$ (521)
94%
$
7,874
$ 8,395
$ (521)
94%
25 Sprinkler Inspection Ti - each additional 50
heads, or portion thereof, above 100
$ 672.33
$ 102.87
$ 569.46
654%
$
6,051
$ 926
$ 5,125
654%
$
6,051
$ 926
$ 5,125
654%
Wohlford Consulting Appendix 4b - Page 15 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service
Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
26 Alarm Plan Check New 1-10
$ 481.78
$ 669.10
$ (187.32)
72%
$
42,878
$ 59,550
$ (16,672)
72%
$
42,878
$ 59,550
$ (16,672)
72%
27 Alarm Plan Check New 11-25
$ 699.90
$ 718.55
$ (18.65)
97%
$
8,399
$ 8,623
$ (224)
97%
$
8,399
$ 8,623
$ (224)
97%
28 Alarm Plan Check New 26-50
$ 699.90
$ 817.45
$ (117.55)
86%
$
9,099
$ 10,627
$ (1,528)
86%
$
9,099
$ 10,627
$ (1,528)
86%
29 Alarm Plan Check New 51-75
$ 1,249.99
$ 965.81
$ 284.18
129%
$
2,500
$ 1,932
$ 568
129%
$
2,500
$ 1,932
$ 568
129%
30 Alarm Plan Check New 76-100
$ 1,913.93
$ 1,110.25
$ 803.68
172%
$
3,828
$ 2,221
$ 1,607
172%
$
3,828
$ 2,221
$ 1,607
172%
31 Alarm Plan Check New - each additional 25
units, or portion thereof, above 100
$ 699.90
$ 361.35
$ 338.55
194%
$
-
$ -
$ -
0%
$
-
$ -
$ -
0%
32 Alarm Inspection New 1-10
$ 672.33
$ 668.34
$ 3.99
101%
$
59,838
$ 59,482
$ 355
101%
$
59,838
$ 59,482
$ 355
101%
33 Alarm Inspection New 11-25
$ 971.95
$ 713.21
$ 258.74
136%
$
11,663
$ 8,559
$ 3,105
136%
$
11,663
$ 8,559
$ 3,105
136%
34 Alarm Inspection New26-50
$ 971.95
$ 1,027.32
$ (55.37)
95%
$
12,635
$ 13,355
$ (720)
95%
$
12,635
$ 13,355
$ (720)
95%
35 Alarm Inspection New51-75
$ 1,475.30
$ 1,117.06
$ 358.24
132%
$
2,951
$ 2,234
$ 716
132%
$
2,951
$ 2,234
$ 716
132%
36 Alarm Inspection New76-100
$ 1,475.30
$ 1,476.04
$ (0.74)
100%
$
2,951
$ 2,952
$ (1)
100%
$
2,951
$ 2,952
$ (1)
100%
37 Alarm Inspection New - each additional 25
units, or portion thereof, above 100
$ 971.95
$ 501.82
$ 470.13
194%
$
-
$ -
$ -
0%
$
-
$ -
$ -
0%
38 Alarm Plan Check Ti 1-10
$ 481.78
$ 656.22
$ (174.44)
73%
$
26,498
$ 36,092
$ (9,594)
73%
$
26,498
$ 36,092
$ (9,594)
73%
39 Alarm Plan Check Ti 11-25
$ 699.90
$ 705.68
$ (5.78)
99%
$
8,399
$ 8,468
$ (69)
99%
$
8,399
$ 8,468
$ (69)
99%
40 Alarm Plan Check Ti 26-50
$ 699.90
$ 804.58
$ (104.68)
87%
$
7,699
$ 8,850
$ (1,152)
87%
$
7,699
$ 8,850
$ (1,152)
87%
41 Alarm Plan Check Ti 51-75
$ 1,249.99
$ 952.94
$ 297.05
131%
$
1,250
$ 953
$ 297
131%
$
1,250
$ 953
$ 297
131%
42 Alarm Plan Check Ti 76-100
$ 1,249.99
$ 1,051.85
$ 198.14
119%
$
1,250
$ 1,052
$ 198
119%
$
1,250
$ 1,052
$ 198
119%
43 Alarm Plan Check Ti - each additional 25
units, or portion thereof, above 100
$ 699.90
$ 472.20
$ 227.70
148%
$
700
$ 472
$ 228
148%
$
700
$ 472
$ 228
148%
44 Wireless Communicator Alarm Ti PC
$ 454.21
$ 516.62
$ (62.41)
88%
$
40,425
$ 45,979
$ (5,554)
88%
$
40,425
$ 45,979
$ (5,554)
88%
45 Alarm Inspection Ti 1-10
$ 672.33
$ 659.33
$ 13.00
102%
$
36,978
$ 36,263
$ 715
102%
$
36,978
$ 36,263
$ 715
102%
46 Alarm Inspection Ti 11-25
$ 971.95
$ 704.20
$ 267.75
138%
$
11,663
$ 8,450
$ 3,213
138%
$
11,663
$ 8,450
$ 3,213
138%
47 Alarm Inspection Ti 26-50
$ 971.95
$ 1,018.31
$ (46.36)
95%
$
10,691
$ 11,201
$ (510)
95%
$
10,691
$ 11,201
$ (510)
95%
48 Alarm Inspection Ti 51-75
$ 1,475.30
$ 1,108.05
$ 367.25
133%
$
1,475
$ 1,108
$ 367
133%
$
1,475
$ 1,108
$ 367
133%
49 Alarm Inspection Ti 76-100
$ 1,475.30
$ 1,467.03
$ 8.27
101%
$
1,475
$ 1,467
$ 8
101%
$
1,475
$ 1,467
$ 8
101%
50 Alarm Inspection Ti - each additional 25
units, or portion thereof, above 100
$ 971.95
$ 601.00
$ 370.95
162%
$
972
$ 601
$ 371
162%
$
972
$ 601
$ 371
162%
51 Wireless Communicator Alarm Inspection
$ 201.34
$ 570.67
$ (369.33)
35%
$
17,919
$ 50,790
$ (32,870)
35%
$
17,919
$ 50,790
$ (32,870)
35%
52 Underground Sprinkler Plan Check
$ 811.35
$ 888.16
$ (76.81)
91%
$
4,868
$ 5,329
$ (461)
91%
$
4,868
$ 5,329
$ (461)
91%
53 Underground Hydrants Plan Check
$ 811.35
$ 1,036.52
$ (225.17)
78%
$
1,623
$ 2,073
$ (450)
78%
$
1,623
$ 2,073
$ (450)
78%
54 Underground Combo Plan Check
$ 1,033.07
$ 1,036.52
$ (3.45)
100%
$
5,165
$ 5,183
$ (17)
100%
$
5,165
$ 5,183
$ (17)
100%
55 Underground Sprinkler Insp
$ 769.41
$ 908.67
$ (139.26)
85%
$
4,616
$ 5,452
$ (836)
85%
$
4,616
$ 5,452
$ (836)
85%
56 Underground Hydrants Insp
$ 874.87
$ 1,046.02
$ (171.15)
84%
$
1,750
$ 2,092
$ (342)
84%
$
1,750
$ 2,092
$ (342)
84%
57 Underground Combo Insp
$ 1,072.62
$ 1,042.80
$ 29.82
103%
$
5,363
$ 5,214
$ 149
103%
$
5,363
$ 5,214
$ 149
103%
58 NFPA 13D Plan Check (Single
Family/Duplex)
$ 576.46
$ 797.30
$ (220.84)
72%
$
144,114
$ 199,325
$ (55,211)
72%
$
144,114
$ 199,325
$ (55,211)
72%
59 NFPA 13R Plan Check (Multi-Family/3 or
more units)
$ 699.90
$ 986.37
$ (286.47)
71%
$
50,393
$ 71,019
$ (20,626)
71%
$
50,393
$ 71,019
$ (20,626)
71%
60 NFPA 13D Inspection (Single
Family/Duplex)
$ 254.07
$ 767.74
$ (513.67)
33%
$
63,518
$ 191,935
$ (128,417)
33%
$
63,518
$ 191,935
$ (128,417)
33%/,
61 NFPA 13R Inspection (Multi-Family/3 or
more units)
$ 769.41
$ 857.54
$ (88.13)
90%
$
55,397
$ 61,743
$ (6,346)
90%
$
55,397
$ 61,743
$ (6,346)
90%
Wohlford Consulting Appendix 4b - Page 16 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service
Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
62 Hood & Duct Sys Plan Check (Per System)
$ 547.69
$ 658.17
$ (110.48)
83%
$
8,215
$ 9,873
$ (1,657)
83%
$
8,215
$ 9,873
$ (1,657)
83%
63 Hood & Duct Sys Insp (Per System)
$ 378.71
$ 723.76
$ (345.05)
52%
$
5,681
$ 10,856
$ (5,176)
52%
1 $
5,681
$ 10,856
$ (5,176)
52%
64 Fire Pumps Plan Check
$ 825.73
$ 1,170.40
$ (344.67)
71%
$
826
$ 1,170
$ (345)
71%
$
826
$ 1,170
$ (345)
71%
65 Fire Pumps Insp
$ 1,290.73
$ 1,306.56
$ (15.83)
99%
$
1,291
$ 1,307
$ (16)
99%
$
1,291
$ 1,307
$ (16)
99%
66 Spray Booth Plan Check (Per System)
$ 601.62
$ 832.27
$ (230.65)
72%
$
3,008
$ 4,161
$ (1,153)
72%
$
3,008
$ 4,161
$ (1,153)
72%
67 Spray Booth Insp (Per System)
$ 738.25
$ 542.72
$ 195.53
136%
$
3,691
$ 2,714
$ 978
136%
$
3,691
$ 2,714
$ 978
136%
68 FM200 Plan Check (Per System)
$ 560.88
$ 1,080.13
$ (519.25)
52%
$
561
$ 1,080
$ (519)
52%
$
561
$ 1,080
$ (519)
52%
69 FM200 Inspection (Per System)
$ -
$ 872.26
$ (872.26)
0%
$
-
$ 872
$ (872)
0%
$
-
$ 872
$ (872)
0%
70 -
$ -
$ -
$
0%
$
-
$ -
$ -
0%
$
-
$ -
$ -
0%
71 Dry Chem Systems Plan Check (Per
System)
$ 384.70
$ 783.41
$ (398.71)
49%
$
385
$ 783
$ (399)
49%
$
385
$ 783
$ (399)
49%
72 Dry Chem Systems Insp (Per System)
$ 378.71
$ 542.72
$ (164.01)
70%
$
379
$ 543
$ (164)
70%
$
379
$ 543
$ (164)
70%
73 Co2 Systms Plan Check (Per System)
$ 607.62
$ 783.41
$ (175.79)
78%
$
608
$ 783
$ (176)
78%
$
608
$ 783
$ (176)
78%
74 Co2 Systems Insp (Per System)
$ 749.03
$ 542.72
$ 206.31
138%
$
749
$ 543
$ 206
138%
$
749
$ 543
$ 206
138%
75 Halogenated Extinguishing Systems Plan
Check
$ 655.55
$ 1,080.13
$ (424.58)
61%
$
656
$ 1,080
$ (425)
61%
$
656
$ 1,080
$ (425)
61%
76 Halogenated Extinguishing Systems Insp
$ -
$ 542.72
$ (542.72)
0%
$
-
$ 543
$ (543)
0%
$
-
$ 543
$ (543)
0%
77 -
$ -
$ -
$
0%
$
-
$ -
$ -
0%
$
-
$ -
$ -
0%
78 Medical Gases Plan Check (Per System)
$ 498.56
$ 995.71
$ (497.15)
50%
$
499
$ 996
$ (497)
50%
$
499
$ 996
$ (497)
50%
79 Medical Gases Insp (Per System)
$ 372.72
$ 826.43
$ (453.71)
45%
$
373
$ 826
$ (454)
45%
$
373
$ 826
$ (454)
45%
80 -
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
$
-
$ -
$ -
0%
81 UST Plan Check
$ 810.15
$ 995.71
$ (186)
81%
$
1,620
$ 1,991
$ (371)
81%
$
1,620
$ 1,991
$ (371)
81%
82 UST Inspection
$ 1,249.99
$ 1,066.23
$ 184
117%
$
2,500
$ 2,132
$ 368
117%
$
2,500
$ 2,132
$ 368
117%
83 AST Plan Check
$ 810.15
$ 995.71
$ (186)
81%
$
1,620
$ 1,991
$ (371)
81%
$
1,620
$ 1,991
$ (371)
81%
84 AST Inspection
$ 1,249.99
$ 737.76
$ 512
169%
$
2,500
$ 1,476
$ 1,024
169%
$
2,500
$ 1,476
$ 1,024
169%
85 Tank/Piping Removal Plan Check
$ 384.70
$ 583.67
$ (199)
66%
$
385
$ 584
$ (199)
66%
$
385
$ 584
$ (199)
66%
86 Tank/Piping Removal Insp
$ 530.91
$ 634.61
$ (103.70)
84%
$
531
$ 635
$ (104)
84%
$
531
$ 635
$ (104)
84%
87 Smoke Control System Plan Check
$ 920.41
$ 1,910.85
$ (990.44)
48%
$
920
$ 1,911
$ (990)
48%
$
920
$ 1,911
$ (990)
48%
88 Smoke Control System Insp
$ 2,434.06
$ 1,770.82
$ 663
137%
$
2,434
$ 1,771
$ 663
137%
$
2,434
$ 1,771
$ 663
137%
89 Dust Collection Plan Check
$ 711.88
$ 897.28
$ (185)
79%
$
1,424
$ 1,795
$ (371)
79%
$
1,424
$ 1,795
$ (371)
79%
90 Dust Collection Insp
$ 430.24
$ 544.92
$ (115)
79%
$
860
$ 1,090
$ (229)
79%
$
860
$ 1,090
$ (229)
79%
91 Industrial Ovens/Furnace Plan Check
$ 699.90
$ 897.28
$ (197.38)
78%
$
-
$ -
$ -
0%
$
-
$ -
$ -
0%
92 Industrial Ovens/Furnace Insp
$ 421.86
$ 544.92
$ (123.06)
77%
$
-
$ -
$ -
0%
$
-
$
$
0%
Wohlford Consulting Appendix 4b - Page 17 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service Informatic
Total Full Cost Results (Unit)
Full Cost Results (Annual - All Services)
F Potential Revenue Results (Fee Services Only)
Projected
Projected
Projected
Projected
Annual
Annual
Annual
Annual
Annual
Annual
Surplus /
Full Cost
Revenue at
Revenue at
Revenue
Full Cost
Revenue
at
Revenue at
Revenue
Full Cost
Current Fee /
Full Cost per
(Subsidy) per
Recovery
Current
Fee
Full Cost per
Surplus /
Recovery
Current Fee
Full Cost
Surplus /
Recovery
Fee #
Fee Title
Deposit
Unit
Unit
Rate
I
Deposit
Unit
(Subsidy)
Rate
/ Deposit
per Unit
(Subsidy)
Rate
Hazmat Chemical Classificaton 1-5
93 chemicals Plan Check
$ 149.81
$ 777.82
$ (628.01)
19%
$
1,498
$ 7,778
$ (6,280)
19%
$
1,498
$ 7,778
$ (6,280)
19%
Hazmat Chemical Classificaton 6-15
94 chemicals Plan Check
$ 359.54
$ 990.60
$ (631.06)
36%
$
1,798
$ 4,953
$ (3,155)
36%
$
1,798
$ 4,953
$ (3,155)
36%
Hazmat Chemical Classificaton 16-50
95 chemicals Plan Check
$ 1,198.45
$ 1,321.81
$ (123.36)
91%
$
5,992
$ 6,609
$ (617)
91%
$
5,992
$ 6,609
$ (617)
91%
Hazmat Chemical Classificaton 51-100
96 chemicals Plan Check
$ 2,241.11
$ 1,628.66
$ 612.45
138%
$
11,206
$ 8,143
$ 3,062
138%
$
11,206
$ 8,143
$ 3,062
138%
Hazmat Chemical Classificaton - each
additional 10 chemicals, or portion thereof,
97 above 100
$ 119.85
$ 596.43
$ (476.58)
20%
$
240
$ 1,193
$ (953)
20%
$
240
$ 1,193
$ (953)
20%
Hazmat Chemical Classificaton 1-5
98 chemicals Insp
$ -
$ 516.62
$ (516.62)
0%
$
-
$ 5,166
$ (5,166)
0%
$
-
$ 5,166
$ (5,166)
0%
Hazmat Chemical Classificaton 6-15
99 chemicals Insp
$
$ 619.42
$ (619.42)
0%
$
$ 3,097
$ (3,097)
0%
$
$ 3,097
$ (3,097)
0%
Hazmat Chemical Classificaton 16-50
100
chemicals Insp
$
$ 827.51
$ (827.51)
0%
$
$ 4,138
$ (4,138)
0%
$
$ 4,138
$ (4,138)
0%
Hazmat Chemical Classificaton 51-100
101
chemicals Insp
$
$ 1,157.88
$ (1,157.88)
0%
$
$ 5,789
$ (5,789)
0%
$
$ 5,789
$ (5,789)
0%
Hazmat Chemical Classificaton - each
additional 10 chemicals, or portion thereof,
102
above 100
$
$ 471.75
$ (471.75)
0%
$
$ 944
$ (944)
0%
$
$ 944
$ (944)
0%
103
HPS Plan Check
$ 1,160.10
$ 1,549.52
$ (389.42)
75°/u
$
11,601
$ 15,495
$ (3,894)
75%
$
11,601
$ 15,495
$ (3,894)
75%
104
HPS Inspection
$ 587.24
$ 816.59
$ (229.35)
72%
$
5,872
$ 8,166
$ (2,293)
72%
$
5,872
$ 8,166
$ (2,293)
72%
105
-
$ -
$ -
$
0%
$
-
$ -
$ -
0%
$
-
$ -
$ -
0%
Minor Technical Report Review (1-10
106
Pages)
$ 485.37
$ 702.06
$ (216.69)
69%
$
485
$ 702
$ (217)
69%
$
485
$ 702
$ (217)
69%
Major Technical Report Review (over 10
107
Pages)
$ 1,155.31
$ 1,150.58
$ 4.73
100%
$
1,155
$ 1,151
$ 5
100%
$
1,155
$ 1,151
$ 5
100%
Adult Care Facility 6 or fewer clients
108
Inspection
$ 388.30
$ 610.00
$ (221.70)
64%
$
1,165
$ 1,830
$ (665)
64%
$
1,165
$ 1,830
$ (665)
64%
109
Residential Care Facility Inspection
$ 388.30
$ 879.24
$ (490.94)
44%
$
1,165
$ 2,638
$ (1,473)
44%
$
1,165
$ 2,638
$ (1,473)
44%
Large Family Day Care 9-14 children
110
Inspection
$ 388.30
$ 610.00
$ (221.70)
64%
$
777
$ 1,220
$ (443)
64%
$
777
$ 1,220
$ (443)
64%
Small Family Day Care 8 or fewer children
111
Inspection
$ 116.25
$ 520.26
$ (404.01)
22%
$
116
$ 520
$ (404)
22%
$
116
$ 520
$ (404)
22%
112
-
$ -
$ -
$ -
0%
$
-
$ -
$ -
0%
$
-
$ -
$ -
00/0
Wohlford Consulting Appendix 4b - Page 18 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service Informatic
Total Full Cost Results (Unit)
Full Cost Results (Annual - All Services)
F Potential Revenue Results (Fee Services Only)
Projected
Projected
Projected
Projected
Annual
Annual
Annual
Annual
Annual
Annual
Surplus /
Full Cost
Revenue at
Revenue at
Revenue
Full Cost
Revenue at
Revenue at
Revenue
Full Cost
Current Fee /
Full Cost per
(Subsidy) per
Recovery
Current Fee
Full Cost per
Surplus /
Recovery
Current Fee
Full Cost
Surplus /
Recovery
Fee #
Fee Title
Deposit
Unit
Unit
Rate
I Deposit
Unit
(Subsidy)
Rate
/ Deposit
per Unit
(Subsidy)
Rate
113
OTHER FEES:
$E -
$
$
0%
$
$
$
0%
Is -
$
$ -
0%
114
Administrative Fee
$ -
$
$ -
0%
$
$
$
0%
$ -
$
$
0%
115
Plan Revision Fee (1st Hour)
$ 260.06
$ 318.59
$ (58.53)
82%
$ 31,728
$ 38,868
$ (7,140)
82%
$ 31,728
$ 38,868
$ (7,140)
82%
Plan Revision Fee (ea addtl. 1/2 Hour or
116
portion thereof)
$ 87.49
$ 228.85
$ (141.36)
38%
$ 437
$ 1,144
$ (707)
38%
$ 437
$ 1,144
$ (707)
38%
Plan resubmittal: fee charged on 4th and
117
each subsequent submittal
$ 260.06
$ 318.05
$ (57.99)
82%
$ 1,300
$ 1,590
$ (290)
82%
$ 1,300
$ 1,590
$ (290)
82%
Re -Check Fee: Charged when project is not
completed or cannot be approved during
118
regular Plan Check Services
$ -
$ 333.18
$ (333.18)
0%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
Re -inspection fee: Charged when project is
not completed or cannot be approved during
119
regular inspection
$ -
$ 333.18
$ (333.18)
0%
$ -
$ 2,332
$ (2,332)
0%
$ -
$ 2,332
$ (2,332)
0%
Penalty for Failure to Cancel Scheduled
120
Inspection & No Show
$ 143.81
$ 365.72
$ (221.91)
39%
$ 1,726
$ 4,389
$ (2,663)
39%
$ 1, 226
$ 4,389
$ (2,663)
39%
121
Job Card Reprint Fee
$ 41.95
$ 13.36
$ 28.59
314%
$ 503
$ 160
$ 343
314%
$ 503
$ 160
$ 343
314%
Hot Works (Actual Time at Staff Hourly
122
Rates) - Calculated cost is potential deposit.
$ 280.44
$ 682.39
$ (401.95)
41%
$ 561
$ 1,365
$ (804)
41%
$ 561
$ 1,365
$ (804)
41%
123
$ -
$ -
$
0%
$ -
$ -
$
0%
$ -
$ -
$ -
0%
124
$ -
$ -
$
0%
$ -
$ -
$ -
0%
$
Wohlford Consulting Appendix 4b - Page 19 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service Informatic
Total Full Cost Results (Unit)
Full Cost Results (Annual - All Services)
F Potential Revenue Results (Fee Services Only)
Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
125
ANNUAL INSPECTION PROGRAM FEES:
$ -
$ -
$ -
0%
$
$
$ -
0%
$ -
$
$ -
0%
126
A-1 Occupancies up to 10,000 sq ft
$
$ 471.78
$ (471.78)
0%
$
$ 23,589
$ (23,589)
0%
$
$ 23,589
$ (23,589)
0%
127
A-1 Occupancies each additional 10,000 sq
ft, or portion therof
$
$ 97.75
$ (97.75)
0%
$
$ 2,151
$ (2,151)
0%
$
$ 2,151
$ (2,151)
0%
128
A-2 Occupancies up to 10,000 sq ft
$
$ 619.04
$ (619.04)
0%
$
$ 199,950
$ (199,950)
0%
$
$ 199,950
$ (199,950)
0%
129
A-2 Occupancies each additional 10,000 sq
ft, or portion therof
$
$ 97.75
$ (97.75)
0%
$
$ 14,663
$ (14,663)
0%
$
$ 14,663
$ (14,663)
0%
130
A-3 Occupancies up to 10,000 sq ft
$
$ 663.92
$ (663.92)
0%
$
$ 33,196
$ (33,196)
0%
$
$ 33,196
$ (33,196)
0%
131
A-3 Occupancies each additional 10,000 sq
ft, or portion therof
$
$ 97.75
$ (97.75)
0%
$
$ 2,444
$ (2,444)
0%
$
$ 2,444
$ (2,444)
0%
132
A-4 Occupancies up to 10,000 sq ft
$
$ 501.22
$ (501.22)
0%
$
$ 5,012
$ (5,012)
0%
$
$ 5,012
$ (5,012)
0%
133
A-4 Occupancies each additional 10,000 sq
ft, or portion therof
$
$ 97.75
$ (97.75)
0%
$
$ 978
$ (978)
0%
$
$ 978
$ (978)
0%
134
A-5 Occupancies up to 50,000 sq ft
$
$ 681.44
$ (681.44)
0%
$
$ 3,407
$ (3,407)
0%
$
$ 3,407
$ (3,407)
0%
135
A-5 Occupancies each additional 10,000 sq
ft, or portion therof
$
$ 97.75
$ (97.75)
0%
$
$ 1,075
$ (1,075)
0%
$
$ 1,075
$ (1,075)
0%
136
$
$ -
$
0%
$
$ -
$ -
0%
$
$ -
$ -
0%
137
EOccupanciesSchools- Elementary
$
$ 1,069.17
$ (1,069.17)
0%
$
$ 11,761
$ (11,761)
00/0
$
$ 11,761
$ (11,761)
0%
138
EOccupanciesSchools- Middle
$
$ 2,146.19
$ (2,146.19)
0%
$
$ 10,731
$ (10,731)
0%
$
$ 10,731
$ (10,731)
0%
139
E Occupancies Schools - High
$
$ 3,223.22
$ (3,223.22)
0%
$
$ 12,893
$ (12,893)
0%
$
$ 12,893
$ (12,893)
0%
140
E Occupancies Schools - Private
$
$ 1,158.92
$ (1,158.92)
0%
$
$ 28,973
$ (28,973)
0%
$
$ 28,973
$ (28,973)
0%
141
$
$ -
$
0%
$
$ -
$
0%
$
$ -
$
00/0
142
1 Occupancy - up to 10,000 square feet
$
$ 636.51
$ (636.51)
0%
$
$
$
0%
$
$
$
0%
143
I Occupancy - each additional 10,000 sq ft,
or portion therof
$
$ 97.75
$ (97.75)
0%
$
$ 98
$ (98)
0%
$
$ 98
$ (98)
0%
144
-
$
$ -
$
0%
$
$
$
0%
$
$
$ -
0%
145
B or M Occupancies - up to 3,600 sq ft
$
$ 412.18
$ (412.18)
0%
$
$ 494,616
$ (494,616)
0%
$
$ 494,616
$ (494,616)
0%
146
B or M Occupancies - 3,601 - 50,000 sq ft
$
$ 681.44
$ (681.44)
0%
$
$ 6,814
$ (6,814)
0%
$
$ 6,814
$ (6,814)
0%
147
B or M Occupancies - 50,001 - 350,000 sq ft
$
$ 816.07
$ (816.07)
0%
$
$ 816
$ (816)
0%
$
$ 816
$ (816)
0%
148
B or M Occupancies - each additional
50.000 sq ft, or portion therof
$
$ 322.10
$ (322.10)
0%
$
$ -
$ -
0%
$
$ -
$ -
0%
149
-
$
$ -
$
0%
$
$ -
$ -
0%
$
$ -
$ -
0%
150
F or S Occupancies - up to 3,600 sq ft
$
$ 455.80
$ (455.80)
0%
$
$ 136,740
$ (136,740)
0%
$
$ 136,740
$ (136,740)
0%
151
F or S Occupancies - 3,601 - 50,000 sq ft
$
$ 681.44
$ (681.44)
0%
$
$ 181,944
$ (181,944)
0%
$
$ 181,944
$ (181,944)
0%
152
F or S Occupancies - 50,001 - 350,000 sq ft
$
$ 816.07
$ (816.07)
0%
$
$ 4,080
$ (4,080)
0%
$
$ 4,080
$ (4,080)
0%
153
F or S Occupancies - each additional
50.000 sq ft, or portion therof
$
$ 375.00
$ (375.00)
0%
$
$ 1,875
$ (1,875)
0%
$
$ 1,875
$ (1,875)
0%
154
-
$
$ -
$
0%
$
$ -
$ -
0%
$
$ -
$ -
00/0
155
H Occupancies - up to 10,000 sq ft
$
$ 606.05
$ (606.05)
0%
$
$ 5,454
$ (5,454)
0%
$
$ 4,848
$ (4,848)
0%
156
H Occupancies - each additional 10,000 sq
ft, or portion therof
$
$ 232.37
$ (232.37)
0%
$
$ 1,859
$ (1,859)
0%
$
$ 1,859
$ (1,859)
0%
Wohlford Consulting Appendix 4b - Page 20 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service
Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
157
-
$
$ -
$
0%
$
$
$
$
09/0
$
$
$
00/0
158
High Rise - greater than 75 feet from grade
(Prohibited by City Ordinance)
$
$ 1,399.33
$ (1,399.33)
0%
$
$
0%
$
$
$
0%
159
$
$ -
$
0%
$
$
$
0%
$
$
$
0%
160
L Occupancies
$
$ 606.05
$ (606.05)
0%
$
$ 10,303
$ (10,303)
0%
$
$ 10,303
$ (10,303)
0%
161
$
$ -
$
0%
$
$ -
$ -
0%
$
$ -
$ -
0%
162
R-1 Occupancies - first 25 units
$
$ 410.93
$ (410.93)
0%
$
$ 411
$ (411)
0%
$
$ 411
$ (411)
0%
163
R-1Occupancies -26-50units
$
$ 576.07
$ (576.07)
0%
$
$ 1,152
$ (1,152)
0%
$
$ 1,152
$ (1,152)
0%
164
R-1 Occupancies - 51-75 units
$
$ 710.70
$ (710.70)
0%
$
$ 2,843
$ (2,843)
0%
$
$ 2,843
$ (2,843)
0%
165
R-1 Occupancies - 76-100 units
$
$ 845.33
$ (845.33)
0%
$
$ 3,381
$ (3,381)
0%r
$ 3,381
$ (3,381)
0%
166
R-1 Occupancies - each additional 25 units
$
$ 142.62
$ (142.62)
0%
$
$ 856
$ (856)
0%$
856
$ (856)
0%
167
$
$ -
$
0%
$
$ -
$ -
0%$
-
$ -
0%
168
$
$ -
$
0%
$
$ -
$ -
0%$
-
$ -
0%
169
R-2 Occupancies - 1-5 Buildings
$
$ 426.54
$ (426.54)
0%
$
$ 5,972
$ (5,972)
0%$
5,972
$ (5,972)
0%
170
R-2 Occupancies - 6-10 Buildings
$
$ 591.69
$ (591.69)
0%
$
$ 4,734
$ (4,734)
0%$
4,734
$ (4,734)
0%
171
R-2 Occupancies - 11-15 Buildings
$
$ 726.32
$ (726.32)
0%
$
$ 5,811
$ (5,811)
0%$
5,811
$ (5,811)
0%
172
R-2 Occupancies - 16-20 Buildings
$
$ 860.94
$ (860.94)
0%
$
$ 6,888
$ (6,888)
0%$
6,888
$ (6,888)
0%
173
R-2 Occupancies - 21-30 Buildings
$
$ 995.57
$ (995.57)
0%
$
$ 6,969
$ (6,969)
0%$
6,969
$ (6,969)
0%
174
R-2Occupancies -30-50Buildings
$
$ 1,130.20
$ (1,130.20)
0%
$
$ 3,391
$ (3,391)
0%$
3,391
$ (3,391)
0%
175
R-2Occupancies ->50Buildings
$
$ 1,399.46
$ (1,399.46)
0%
$
$ 4,198
$ (4,198)
0%$
4,198
$ (4,198)
0%
176
$
$ -
$
0%
$
$ -
$ -
0%$
-
$ -
0%
177
Re -inspection fee (after initial and first
inspection)
$
$ 299.66
$ (299.66)
0%
$
$ 543,583
$ (543,583)
0%$
543,583
$ (543,583)
0%
178
-
$
$ -
$
0%
$
$ -
$ -
0%$
-
$
0%
Wohlford Consulting Appendix 4b- Page 21 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service
Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
179
ANNUAL INSPECTION AND OPERATING
PERMITS (IFC 105 PERMITS) -Add-on
Fees to the Annual Inspection Program
Fee:
$ -
$ -
$ -
0%
$
-
$
$ -
0%
$
-
$
$ -
0%
180
Combustible Dust Producing Operation
$ 95.88
$ 281.80
$ (185.92)
34%
$
11,985
$ 35,225
$ (23,240)
34%
$
11,985
$ 35,225
$ (23,240)
34%
181
Fire hydrants and Valves
$ 95.88
$ 281.80
$ (185.92)
34%
$
239,691
$ 704,500
$ (464,809)
34%
$
239,691
$ 704,500
$ (464,809)
34%
182
Hot Works Permit
$ 95.88
$ 236.92
$ (141.04)
40%
$
28,763
$ 71,076
$ (42,313)
40%
$
28,763
$ 71,076
$ (42,313)
40%
183
Lumber yard
$ 95.88
$ 281.80
$ (185.92)
34%
$
288
$ 845
$ (558)
34%
$
288
$ 845
$ (558)
34%
184
Industrial Ovens
$ 95.88
$ 236.92
$ (141.04)
40%
$
479
$ 1,185
$ (705)
40%
$
479
$ 1,185
$ (705)
40%
185
Liquid or gas fueled vehicles or euipment in
assembly buildings
$ 95.88
$ 251.28
$ (155.40)
38%
$
959
$ 2,513
$ (1,554)
38%
$
959
$ 2,513
$ (1,554)
38%
186
Outdoor assembly event
$ 95.88
$ 371.55
$ (275.67)
26%
$
959
$ 3,716
$ (2,757)
26%
$
959
$ 3,716
$ (2,757)
26%
187
Cutting and/or Welding
$ 95.88
$ 251.28
$ (155.40)
38%
$
9,588
$ 25,128
$ (15,540)
38%
$
9,588
$ 25,128
$ (15,540)
38%
188
Temporary membrane structures and tents
$ 95.88
$ 371.55
$ (275.67)
26%
$
9,588
$ 37,155
$ (27,567)
26%
$
9,588
$ 37,155
$ (27,567)
26%
189
Aircraft refueling Vehicle/Avation Facilities
$ 95.88
$ 251.26
$ (155.38)
38%
$
-
$ -
$ -
0%
$
-
$ -
$ -
0%
190
Chapter 48
$ 95.88
$ 770.24
$ (674.36)
12%
$
479
$ 3,851
$ (3,372)
12%
$
479
$ 3,851
$ (3,372)
12%
191
Aerosol Products
$ 95.88
$ 233.74
$ (137.86)
41%
$
7,191
$ 17,531
$ (10,340)
41%
$
7,191
$ 17,531
$ (10,340)
41%
192
Cellulose Nitrate Film
$ 95.88
$ 236.90
$ (141.02)
40%
$
192
$ 474
$ (282)
401/6
$
192
$ 474
$ (282)
40%
193
Combustible Fiber Storage
$ 95.88
$ 281.77
$ (185.89)
34%
$
959
$ 2,818
$ (1,859)
34%
$
959
$ 2,818
$ (1,859)
34%
194
Compressed Gases
$ 95.88
$ 251.26
$ (155.38)
38%
$
4,794
$ 12,563
$ (7,769)
381/6
$
4,794
$ 12,563
$ (7,769)
389/6
195
Cryogenic Fluids
$ 95.88
$ 251.26
$ (155.38)
38%
$
959
$ 2,513
$ (1,554)
38%
$
959
$ 2,513
$ (1,554)
38%
196
Explosives 105.6.15
$ 95.88
$ 281.77
$ (185.89)
34%
$
479
$ 1,409
$ (929)
34%
$
479
$ 1,409
$ (929)
34%
197
Pyrotechnic Special Effects material
$ 95.88
$ 1,203.27
$ (1,107.39)
8%
$
4,794
$ 60,164
$ (55,370)
8%
$
4,794
$ 60,164
$ (55,370)
8%
198
Flammable and Combustible Liquids
$ 95.88
$ 326.64
$ (230.76)
29%
$
33,557
$ 114,324
$ (80,767)
29%
$
33,557
$ 114,324
$ (80,767)
29%
199
Hazardous Materials
$ 95.88
$ 326.64
$ (230.76)
29%
$
47,938
$ 163,320
$ (115,382)
29%
$
47,938
$ 163,320
$ (115,382)
29%
200
High Piled Storage
$ 95.88
$ 371.52
$ (275.64)
26%
$
33,557
$ 130,032
$ (96,475)
26%
$
33,557
$ 130,032
$ (96,475)
26%
201
Amusement Building
$ 95.88
$ 576.32
$ (480.44)
17%
$
-
$ -
$ -
00/0
$
-
$ -
$ -
0%
202
Carnival and Fairs
$ 95.88
$ 576.32
$ (480.44)
17%
$
192
$ 1,153
$ (961)
17%
$
192
$ 1,153
$ (961)
17%
203
Exhibits and Trade Shows
$ 95.88
$ 576.32
$ (480.44)
17%
$
479
$ 2,882
$ (2,402)
17%
$
479
$ 2,882
$ (2,402)
17%
204
Waste Handling
$ 95.88
$ 236.90
$ (141.02)
40%
$
4,794
$ 11,845
$ (7,051)
40%
$
4,794
$ 11,845
$ (7,051)
40%
205
$ -
$ -
$
0%
$
-
$ -
$
0%
$
-
$ -
$
00/0
206
$ -
$ -
$
0%
$
-
$ -
$
0%
$
-
$ -
$
0%
Wohlford Consulting Appendix 4b - Page 22 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service
Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
207
FULL COST RECOVERY RATES
(HOURLY STAFF RATES:
$ -
$
$
0%
$ -
$
$
0%
$
$
$
0%
208
Service in Excess of Standard (per hour @
staff hourly rates and at the discretion of the
Chief or Fire Marshal)
$
$
$
$
0%
$
$
$
$
$
0%
$
$
$
00/0
209
Plan Checks Other Than Those Already
Listed (per hour @ staff hourly rates)
$
$
0%
$
0%
$
$
$
0%
210
Inspections Other Than Those Already
Listed (per hour @ staff hourly rates)
$
$
$
0%
$
$
$
0%
$
$
$
0%
211
landividual Staff Hourly Rates:
0%
$
01%
$
$
0%
212
Assistant Fire Marshal (per hour)
$ 180.97
$ 211.46
$ (30.49)
86%
$
$
$
0%
$
$
$
0%
213
Fire Safety Specialist (per hour)
$ 106.66
$ 197.81
$ (91.15)
54%
$
$
$
0%
$
$
$
0%
214
Fire Plan Check - (per hour)
$ 99.47
$ 179.49
$ (80.02)
55%
$
$
$
0%
$
$
$
00/0
215
Fire Inspection (per hour)
$ 99.47
$ 179.49
$ (80.02)
55%
$
$
$
01/o
$
$
$
0%
216
Community Development Tech. (per hour)
$ 99.47
$ 160.91
$ (61.44)
62%
$
$
$
0%
$
$
$
0%
217
Adminstrative Assistant (per hour)
$ 99.47
$ 158.42
$ (58.95)
63%
$
$
$
0%
$
$
$
0%
218
$ -
$ -
$
0%
$
$
$
0%
$
$
$
0%
219
NON -FEE ACTIVITIES (annual):
$ -
$ -
$ -
0%
$ -
$
$
0%
$ -
$
$ -
0%
220
Counter / General Assistance: Pre -Project
Support(annual)
$
$ 15,941.43
$ (15,941.43)
0%
$
$ 15,941
$ (15,941)
0%
$
$
$
0%
221
Counter / General Assistance: Public
Information - not recoverable (annual)
$
$ 17,699.73
$ (17,699.73)
0%
$
$ 17,700
$ (17,700)
0%
$
$
$
0%
222
Public Education (annual)
$
$ 8,073.10
$ (8,073.10)
0%
$
$ 8,073
$ (8,073)
00/0
$
$
$
0%
223
Special Events (annual)
$
$ 7,268.56
$ (7,268.56)
0%
$
$ 7,269
$ (7,269)
0%
$
$
$
0%
224
Other Specialized Training (annual)
$
$ 9,859.73
$ (9,859.73)
0%
$
$ 9,860
$ (9,860)
0%
$
$
$
0%
225
226
1 Other Non -Fee Services (annual)
�SJLIPPPORT TO OTHER DEPARTMENTS /
DVISIONS - General (annual):
$
$
$ -
$
IF
0%
0%
$
$
$ -
$
0%
0%
$
$
$
Is
$
$
0%
0%
227
N/A
$
$
$
0%
$
$
$
0%
$
$
$
0%
228
$
$
$
0%
$
$
$
00/0
$
$
$
0%
229
$
$
$
0%
$
$
$
0%
$
$
$
0%
230
$
$
$
0%
$
$
$
0%
$
$
$
00/0
231
$
$
$
0%
$
$
$
0%
$
$
$
0%
232
$
$
$
0%
$
$
$
0%
$
$
$
0%
233
$
$
$
0%
$
$
$
0%
$
$
$
0%
234
$
$
$
0%
$
$
$
0%
$
$
$
0%
235
$
$
$
0%
$
$
$
0%
$
$
$
0%
236
$
$
$
0%
$
$
$
0%
$
$
$
0%
237
238
END OF FIRE ACTIVITIES
$
$
$
0%
/o
$
$
$
$
0%
0%
$
$
$
$
$
0%
%
Wohlford Consulting Appendix 4b - Page 23 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service Informatic
Total Full Cost Results (Unit)
Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
239
CONTRIBUTIONS TO PLANNING FEES:
$ -
$
$ -
0%
240
Adult Business
$
0%
241
Adult Business - Conditional Use Permit
$
$ 140.35
$ (140.35)
0%
242
Adult Business - Employee Permit
$
$ 122.65
$ (122.65)
00/0
243
Adult Business - Owner Permit
$
$ 122.65
$ (122.65)
0%
244
Annexation
$ -
$
00/0
245
Annexation / Detachment (Actual Time @
Staff Cost Recovery Hourly Rates)
[calculated cost is the potential deposit]
$
$
$
0%
246
Pre -Annexation Agreement (Actual Time @
Staff Cost Recovery Hourly Rates)
[calculated cost is the potential deposit]
$
$
$
00/0
247
Appeal
$ -
$ -
$ -
0%
248
Appeal
$
$
$
0%
249
Bingo License
$ -
$ -
$ -
0%
250
Bingo License
$
$
$
0%
251
$
$
$
0%
252
CEQA
$
$
0%
253
Negative Declaration (Without Mitigation)
$
$ 140.35
$ (140.35)
0%
254
Negative Declaration (With Mitigation)
$
$ 140.35
$ (140.35)
00/0
255
City Managed EIR
$
$ 573.71
$ (573.71)
0%
256
Supplemental EIR
$
$ 309.38
$ (309.38)
00/0
257
Addendum to EIR
$
$ 309.38
$ (309.38)
0%
258
Certificate Of Historical Appropriateness
$ -
$ -
$ -
0%
259
Certificate Of Historical Appropriateness
$
$
$
00/0
260
-
$
$
$
0%
261
Conditional Use Permits
262
Conditional Use Permit - No Site Changes
$
$ 169.54
$ (169.54)
00/0
263
Conditional Use Permit with Development
Plan
$
$ 296.42
$ (296.42)
00/0
264
Conditional Use Permit - Large Family Day
Care
$
$ 148.39
$ (148.39)
0%
265
CUP - Modification of Existing CUP
$
$ 148.39
$ (148.39)
0%
266
CC&R Review
$
$ -
$
0%
267
CC&R Review (staff)
$
$ 122.65
$ (122.65)
0%
268
Development Agreement
$
$ -
$
00/0
269
Development Agreement - New
$
$ 166.79
$ (166.79)
0%
270
Development Agreement - Modification
$
$ 148.39
$ (148.39)
00/0
271
-
$
$ -
$
0%
272
273
Development Plan
Development Plan -Larger than 100,000 SF
$
$
$ 296.42
$ (296.42)
0%
00/0
274
Development Plan - 10,000-100,000 SF
$
$ 275.27
$ (275.27)
0%
Full Cost Results (Annual - All Services)
Potential Revenue Results (Fee Services Only)
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Wohlford Consulting Appendix 4b - Page 24 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service Informatic
Total Full Cost Results (Unit)
Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
275
Development Plan -Less than 10,000 SF
$
$ 169.54
$ (169.54)
0%
276
DIF Credit Or Reduction
$ -
$ -
$ -
0%
277
DIF Credit Or Reduction
$
$
$
0%
278
$
$
$
0%
279
LExtension of Time
$
$
$
00/0
280
Extension Of Time
$
$ 169.54
$ (169.54)
00/0
281
$
$ -
$
0%
282
Finding of Public Convenience Or
Necessity
$
$
$
00/0
283
Finding Of Public Convenience or Necessity
(without DP or CUP)
$
$
$
00/0
284
Finding Of Public Convenience & or
Necessity with DP or CUP
$
$
$
00/0
285
General Plan Amendment
$ -
$ -
$ -
0%
286
General Plan Amendment - Text Or Exhibit
$
$ 765.87
$ (765.87)
00/0
287
General Plan Amendment - Zoning & and/or
Land Map
$
$ 501.54
$ (501.54)
0%
288
General Plan Amendment with Fiscal
ImpactAnalysis [DELETE]
$
$ -
$
0%
289
Fiscal Impact Analysis (City Staff fee in
addition to external contractor cost) [NEW]
$
$
$
00/0
290
Landscape Construction Plan
$ -
$ -
$
0%
291
Landscape Construction Plan (City
administration and processing fee --in
addition to consultant review fee charged
directly to applicant)
$
$
$
0%
292
Maps
$
293
Certificate Of Compliance (support to Public
Works fee)
$
$
$
0%
294
Condominium Conversion
$
$
$
00/0
295
Condominium Map
$
$ 205.49
$ (205.49)
0%
296
Lot Line Adjustment (support to Public
Works fee)
$
$ 95.53
$ (95.53)
00/0
297
Minor Change To Approved Tentative Map
$
$ 201.26
$ (201.26)
00/0
298
Parcel Merger (support to Public Works fee)
$
$ 148.39
$ (148.39)
00/0
299
Phasing Plan For Tentative Map
$
$ 378.26
$ (378.26)
00/0
300
Reversion To Acreage
$
$ -
$
0%
301
TPM Commercial Industrial Standard
$
$ 465.59
$ (465.59)
00/0
302
TPM Commercial Industrial with Waiver
$
$ -
$
00/0
303
TPM Residential Standard
$
$ 359.86
$ (359.86)
0%
304
TPM Residential wth Waiver- Final Map
$
$ -
$
0%
305
TPM Revised
$
$
$
00/0
306
TPM Vesting
$
$
$
0%
Full Cost Results (Annual - All Services)
Potential Revenue Results (Fee Services Only)
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Wohlford Consulting Appendix 4b - Page 25 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service Informatic
Total Full Cost Results (Unit)
Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
307
TTM Standard - 5-34 Lots/Units (flat fee)
$
$ -
$
00/0
308
TTM Standard 35+ units / lots
$
$ 272.52
$ (272.52)
0%
309
TTM Standard - Additional Unit Fee per lot
above 35 lots
$
$ 219.66
$ (219.66)
0%
310
TTM Standard Revised Map
$
$ 272.52
$ (272.52)
00/0
311
TTM Vesting 5 - 34 lots/units (flat fee)
$
$ -
$
0%
312
TTM Vesting 35+ units / lots
$
$ 325.39
$ (325.39)
0%
313
TTM Vesting - Additional Unit Fee per lot
above 35 lots
$
$ 219.66
$ (219.66)
0%
314
TTM Vesting Revised Map
$
$ 219.66
$ (219.66)
0%
315
-
$
$ -
$
0%
316
LMassage Permits
$
0%
317
Massage Establishment Permit
$
$
$
0%
318
Massage Establishment Permit Renewal
$
$
$
0%
319
assage Technician License [This service
now a state responsibility.)
$
$
$
0%
320
$
$
$
0%
321
Minor Exception
$ -
$ -
$ -
0%
322
Minor Exception - General
$
$
$
0%
323
Minor Exception - Individual Homeowner
$
$
$
0%
324
Modifications
$
$
$
0%
325
Major Modification
$
$ 275.27
$ (275.27)
0%
326
Minor Modification
$
$ 169.54
$ (169.54)
00/0
327
Minor Modification - Plan Review Only
$
$ 271.68
$ (271.68)
0%
328
Minor Modification - Plan Review Only
(Individual Homeowner)
$
$ 158.97
$ (158.97)
0%
329
unicipal Code Amendment
$
$
$
0%
330
Municipal Code Amendment
$
$ -
$
0%
331
Planned Development Overlay
$
$ -
$
00/0
332
Planned Development Overlay
$
$ 359.86
$ (359.86)
0%
333
Planned Development Overlay -
Amendment
$
$ 254.13
$ (254.13)
0%
334
Residential Tract Home Product Review
$ -
$ -
$ -
0%
335
Residential Tract Home Product Review
$
$ 483.99
$ (483.99)
00/0
336
Accessory Dwelling Unit
$ -
$ -
$ -
0%
337
Accessory Dwelling Unit
$
$ 254.13
$ (254.13)
00/0
338
$
$ -
$
0%
339
Signage
$
$
$
0%
340
Sign Program Amendment
$
$
$
0%
341
Sign Program - New
$
$
$
00/0
342
$
$
$
0%
343
Specific Plan
$
$
$
0%
344
Specific Plan - New
$
$ 924.47
$ (924.47)
0%
345
Specific Plan Amendment - Major
$
$ 713.00
$ (713.00)
00/0
346
Specific Plan Amendment - Minor
$
$ 924.47
$ (924.47)
0%
Full Cost Results (Annual - All Services)
Potential Revenue Results (Fee Services Only)
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Wohlford Consulting Appendix 4b - Page 26 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service Informatic
Total Full Cost Results (Unit)
Full Cost Results (Annual -All Services)
Potential Revenue Results (Fee Services Only)
Projected
Projected
Projected
Projected
Annual
Annual
Annual
Annual
Annual
Annual
Surplus /
Full Cost
Revenue at
Revenue at
Revenue
Full Cost
Revenue at
Revenue at
Revenue
Full Cost
Current Fee /
Full Cost per
(Subsidy) per
Recovery
Current Fee
Full Cost per
Surplus /
Recovery
Current Fee
Full Cost
Surplus /
Recovery
Fee #
Fee Title
Deposit
Unit
Unit
Rate
/ Deposit
Unit
(Subsidy)
Rate
/ Deposit
per Unit
(Subsidy)
Rate
347
$ -
$ -
$
0 Wohlford Consulting Appendix 4b - Page 27 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - MISCELLANEOUS
Fee Service
Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Current Fee /
Deposit
Full Cost per
Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
I Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
348
Temporary Use Permits
$
$ -
$
0%
0%
349
Temporary Use Permit - Minor Regular
$
$ 107.62
$ (107.62)
350
Temporary Use Permit - Major Regular
$
$ 143.57
$ (143.57)
00/0
351
Temporary Use Permit - Major Non Profit
$
$ 143.57
$ (143.57)
0%
352
Temporary Use Permit - Minor Non Profit
$
$ 107.62
$ (107.62)
00/0
353
Temporary Use Permit - Model Home
Complex
$
$ 143.57
$ (143.57)
0%
354
Temporary Use Permit - Sales /
Construction Trailer
$
$ 107.62
$ (107.62)
00/0
355
$
$ -
$
0%
356
Variance
$
$
$
0%
357
Variance
$
$
$
0%
358
Vendors License
$
$
$
0%
359
Vendors License
$
$
$
0%
360
$
$
$
0%
361
Wireless Antenna Facility
$ -
$ -
$
0%
362
Wireless Antenna Facility -Administrative
Review
$
$ 143.57
$ (143.57)
0%
363
Wireless Antenna Facility - Revision with
Public Hearing
$
$ 460.55
$ (460.55)
0%
364
Wireless Antenna Facility - New
$
$ 782.37
$ (782.37)
0%
365
366
Zoning Lette
Zoning Letter
$ -
$
$ -
$ -
$ -
$
0%
0%
367
$
$
$
0%
368
Other Fees
$
$
$
0%
369
General Plan Update [DELETE]
$
$
$
0%
370
Records Retention [DELETE]
$
$
$
0%
371
IT/Software Update [DELETE]
$
$
$
0%
372
Base Planning Review Fee [DELETE]
$
$
0%
373
Excess Review Fee - 4th and subsequent
reviews - Actual Time at Staff Hourly Rates
$
$
$
0%
374
Stockpiling Permit
$
$
$
0%
375
$
$
0%
Adjustment for Suballocated Costs:
$
$
0%
$
$
$
$
$
$
$
$
TOTALS:
$ 1,396,851 1 $ 4,569,922 1 $ (3,173,070)1 31% $ 1,396,851 1 $ 4,510,473 1 $ (3,113,622) 31% Revenue Totals Revenue Totals
Wohlford Consulting Appendix 4b - Page 28 of 28 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION -RELATED FIRE FEES
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
1 NEW OCCUPANCIES:
2.0 2.0
$ -
$ -
$
0%
$ -
$ -
$ -
0%
2 NC - Commercial w/o interior improvements (shell) -
up to 5,000 sf
$ 317.35
$ 369.20
$ (51.85)
86%
$ 476.03
$ 410.03
$ 66.00
116%
3 NC - Commercial w/o interior improvements (shell) -
5,001-15,000 sf
$ 317.35
$ 533.97
$ (216.62)
59%
$ 476.03
$ 472.44
$ 3.59
101%
4 NC - Commercial w/o interior improvements (shell) -
15,001-50,000 sf
$ 721.95
$ 682.33
$ 39.62
106%
$ 1,082.92
$ 365.60
$ 717.32
296%
5 NC - Commercial w/o interior improvements (shell) -
each additional 1,000 sf, or portion thereof, over
50,000 SF
1.0 1.0
$ 14.43
$ 175.08
$ (160.65)
8%
$ 21.54
$ 68.82
$ (47.28)
31%
6 -
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
7 NC - Commercial with interior improvements - up to
5,000 sf
-
$ 723.39
$ 385.61
$ 337.78
188%
$ 1,085.08
$ 380.59
$ 704.49
285%
8 NC - Commercial with interior improvements - 5,001-
15,000 sf
2.0 2.0
$ 887.49
$ 533.97
$ 353.52
166%
$ 1,331.24
$ 531.73
$ 799.51
250%
9 NC - Commercial with interior improvements -
15,001-50,000 sf
3.0 3.0
$ 1,636.45
$ 682.33
$ 954.12
240%
$ 2,454.67
$ 514.09
$ 1,940.58
477%
10 NC - Commercial with interior improvements - each
additional 1,000 sf, or portion thereof, over 50,000
SF
-
$ 14.47
$ 175.08
$(160.61)
8%
$ 21.70
$ 68.82
$ (47.12)
32%
11 -
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
12 NC - Warehouse - up to 5,000 sf
$ 1,023.48
$ 385.61
$ 637.87
265%
$ 1,535.22
$ 380.59
$ 1,154.63
403%
13 NC - Warehouse - 5,001-15,000 sf
$ 1,139.65
$ 533.97
$ 605.68
213%
$ 1,709.47
$ 621.96
$ 1,087.51
275%
14 NC - Warehouse - 15,001-50,000 sf
2.0 2.0
$ 785.07
$ 682.33
$ 102.74
115%
$ 1,177.60
$ 559.45
$ 618.15
210%
15 NC - Warehouse - each additional 1,000 sf, or
portion thereof, over 50,000 SF
-
$ 20.47
$ 175.08
$ (154.61)
12%
$ 30.70
$ 129.85
$ (99.15)
24%
16 -
$ -
$ -
$
0%
$ -
$ -
$
0%
17 $ -
$ -
$
0%
$ -
$ -
$
0%
18 NC - Commercial High Rise - up to 10,000 sf
$ 1,281.39
$ 929.60
$ 351.79
138%
$ 1,922.08
$ 514.57
$ 1,407.51
374%
19 NC - Commercial High Rise - 10,001-50,000 sf
$ 1,917.65
$1,226.31
$ 691.34
156%
$ 2,876.47
$ 783.81
$ 2,092.66
367%
20 NC - Commercial High Rise - each additional 1,000
sf, or portion thereof, over 50,000 SF
$ 282.72
$ 323.44
$ (40.72)
87%
$ 424.07
$ 99.34
$ 324.73
427%
21 -
$ -
$ -
$ -
0"/o
$ -
$ -
$ -
0%
22 _
$ _
$ _
$
0%
$ -
$ -
$ -
0%
23 NC - Parking Structure - up to 100,000 sf
1.0 1.0
$ 974.51
$ 632.88
$ 341.63
154%
$ 1,461.77
$ 559.45
$ 902.32
261%
24 NC - Parking Structure - 100,001-500,000 sf
-
-
$ 1,332.13
$ 929.60
$ 402.53
143%
$ 1,998.19
$ 873.55
$ 1,124.64
229%
25 NC - Parking Structure - each additional 10,000 sf,
or portion thereof, over 500,000 SF
$ 101.63
$ 197.81
$ (96.18)
51 %
$ 152.44
$ 99.34
$ 53.10
153%
26 0
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
27 NC - New Single Family Custom/ Model - up to
1,000 sf
$ 276.60
$ 369.00
$ (92.40)
75%
$ 414.90
$ 469.70
$ (54.80)
880/0
28 NC - New Single Family Custom/ Model - 1,001-
2,500 sf
3.0 3.0
$ 276.60
$ 434.28
$ (157.68)
64%
$ 414.90
$ 469.70
$ (54.80)
88%
29 NC - New Single Family Custom/ Model - 2,501-
5,000 sf
6.0 6.0
$ 276.60
$ 517.95
$ (241.35)
53"/0
$ 414.90
$ 469.70
$ (54.80)
88%
Wohlford Consulting Appendix 4c - Page 1 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION -RELATED FIRE FEES
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
30 NC - New Single Family Custom/ Model - each
additional 500 sf, or portion thereof, over 5,000 SF
1.0 -
1.0 -
-
$ 276.60
$ 197.81
$ 78.79
140%
$ 414.90
$ 113.69
$ 301.21
365%
31 $ -
$ -
$ -
0%
$ -
$ -
$ -
0%
32 NC - New Single Family - Production (Tract) - up to
1,000 sf
$
$ 385.46
$ (385.46)
0%
$ 71.91
$ 455.34
$ (383.43)
16%
33 NC - New Single Family - Production (Tract) - 1,001- 2,500 sf
60.0 60.0
$
$ 434.91
$ (434.91)
0%
$ 71.91
$ 455.34
$ (383.43)
16%
34 NC - New Single Family - Production (Tract) - 2,501- 5,000 sf
28.0 28.0
$
$ 372.70
$ (372.70)
0%
$ 71.91
$ 455.34
$ (383.43)
16%
35 NC - New Single Family - Production (Tract) - each
additional 500 sf, or portion thereof, over 5,000 SF
-
-
$
$ 98.91
$ (98.91)
0%
$ 71.91
$ 113.69
$ (41.78)
63%
36 $
$ -
$ -
0%
$ -
$ -
$ -
0%
37 NC - Apartments/Multi- Family - up to 5,000 sf
$ 254.07
$ 534.61
$ (280.54)
48%
$ 381.11
$ 469.16
$ (88.05)
81 38
NC - Apartments/Multi- Family - 5,001-10,000 sf
$ 376.31
$ 732.42
$ (356.11)
51 %
$ 564.47
$ 603.78
$ (39.31)
93%
39 NC -Apartments/Multi- Family- 10,001-15,000 sf
$ 368.40
$ 880.78
$ (512.38)
42%
$ 552.61
$ 603.78
$ (51.17)
92%
40 NC - Apartments/Multi- Family - each additional
1,000 sf, or portion thereof, over 15,000 SF
$ 4.24
$ 233.76
$ (229.52)
2%
$ 6.36
$ 113.69
$ (107.33)
6%
41 $ -
$ -
$ -
0%
$ -
$ -
$ -
0%
42 NC - Hotels/Motels - up to 10,000 sf
$ 376.31
$ 732.42
$ (356.11)
51 %
$ 564.47
$ 603.78
$ (39.31)
93%
43 NC - Hotels/Motels - 10,001-50,000 sf
1.0 1.0
$ 561.36
$ 880.78
$ (319.42)
64%
$ 842.03
$ 738.40
$ 103.63
114%
44 NC - Hotels/Motels - each additional 1,000 sf, or
portion thereof, over 50,000 SF
1.0 1.0
$ 11.22
$ 233.76
$ (222.54)
5%
$ 16.83
$ 158.57
$ (141.74)
11 45
-
-
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
46 TI - Tenant Improvements - up to 2,500 sf
73.0 73.0
$ 357.86
$ 459.79
$ (101.93)
78%
$ 536.79
$ 409.39
$ 127.40
131 %
47 TI - Tenant Improvements - 2,501- 5,000 sf
40.0 40.0
$ 448.94
$ 533.97
$ (85.03)
84%
$ 673.41
$ 409.39
$ 264.02
164%
48 TI - Tenant Improvements - 5,001-20,000 sf
32.0 32.0
$ 761.26
$ 682.42
$ 78.84
112%
$ 1,141.89
$ 499.14
$ 642.75
229%
49 TI - Tenant Improvements - each additional 1,000 sf, or portion thereof, over 20,000 SF
9.0 9.0
$ 150.53
$ 233.76
$ (83.23)
64%
$ 225.79
$ 113.69
$ 112.10
199%
50 -
-
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
51 NC - OSHPOD Category 2 and above (Surgery
Centers, Dialysis) - up to 5,000 sf
-
$ 355.22
$ 550.59
$ (195.37)
65%
$ 532.83
$ 528.93
$ 3.90
101 %
52 NC - OSHPOD Category 2 and above (Surgery
Centers, Dialysis) - 5,001-15,000 sf
$ 969.79
$ 698.95
$ 270.84
139%
$ 1,454.68
$ 528.93
$ 925.75
275%
53 NC - OSHPOD Category 2 and above (Surgery
Centers, Dialysis) - 15,001-50,000 sf
$ 886.86
$ 847.31
$ 39.55
105%
$ 1,330.28
$ 663.55
$ 666.73
200%
54 NC - OSHPOD Category 2 and above (Surgery
Centers, Dialysis) - each additional 1,000 sf, or
portion thereof, over 50,000 SF
$ 70.95
$ 332.67
$ (261.72)
21 %
$ 106.42
$ 68.82
$ 37.60
155%
55 $ -
$ -
$ -
0%
$ -
$ -
$ -
0%
56 TI - OSHPOD Category 2 and above (i.e. Surgery
Centers, Dialysis) - up to 5,000 sf
$ 637.90
$ 551.22
$ 86.68
116%
$ 956.85
$ 528.93
$ 427.92
181 %
57 TI - OSHPOD Category 2 and above (i.e. Surgery
Centers, Dialysis) - 5,001-15,000 sf
$ 737.13
$ 698.95
$ 38.18
105%
$ 1,105.69
$ 528.93
$ 576.76
209%
58 TI - OSHPOD Category 2 and above (i.e. Surgery
Centers, Dialysis) - 15,001-50,000 sf
$ 1,286.50
$ 847.31
$ 439.19
152%
$ 1,929.79
$ 663.55
$ 1,266.24
291%
Wohlford Consulting Appendix 4c - Page 2 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION -RELATED FIRE FEES
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Annual
PLAN
Annual
Department /
Department /
CHECK
INSPECTION
Division
Surplus /
Full Cost Division
Surplus /
Full Cost
Revenue
Revenue
Current Fee /
Full Cost
(Subsidy)
Recovery Current Fee /
Full Cost
(Subsidy)
Recovery
Fee #
Fee Title
Activity Level
Activity Level
Deposit
per Unit
per Unit
Rate Deposit
per Unit
per Unit
Rate
TI - OSHPOD Category 2 and above (i.e. Surgery
Centers, Dialysis) - each additional 1,000 sf, or
59 portion thereof, over 50,000 SIF
$ 12.75
$ 372.89
$ (360.14)
3% $ 19.14
$ 68.82
$ (49.68)
28%
60 $ -
$ -
$ -
0% $ -
$ -
$ -
0%
61 NC - UTILITY BUILDING (Garage) - up to 500 sf
$ 173.06
$ 253.67
$ (80.61)
68% $ 259.59
$ 304.03
$ (44.44)
85%
62 NC - UTILITY BUILDING (Garage) - 501-1,000 sf
6.0 6.0
$ 213.97
$ 302.53
$ (88.56)
71% $ 320.96
$ 304.03
$ 16.93
106%
63 NC - UTILITY BUILDING (Garage) - 1,001-2,500 sf
8.0 8.0
$ 266.06
$ 303.13
$ (37.07)
88% $ 399.09
$ 348.91
$ 50.18
114%
NC - UTILITY BUILDING (Garage) - each additional
64 500 sf, or portion thereof, over 2,500 SF
1.0 1.0
$ 8.19
$ 175.08
$ (166.89)
5% $ 12.27
$ 54.46
$ (42.19)
23%
65 -
-
$ -
$ -
$
0% $ -
$ -
$
0%
66 -
$ -
$ -
$
0% $ -
$ -
$
0%
Wohlford Consulting Appendix 4c - Page 3 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION -RELATED FIRE FEES
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
67 MISCELLANEOUS BUILDING FEES (NON-MPE):
8.0 $
$
$ -
0%
$
$ -
$
0%
68 Accessory Structure 0 to 500 sf
8.0 $
$ 254.31
$ (254.31)
0%
$
$ 274.06
$ (274.06)
0%
69 Accessory Structure 500 to 1000 sf
12.0 12.0
$
$ 303.17
$ (303.17)
0%
$
$ 274.06
$ (274.06)
0%
70 Accessory Structure 1001 sf +
6.0 6.0
$
$ 302.64
$ (302.64)
0%
$
$ 206.00
$ (206.00)
00/0
71 CellularTower- free-standing
2.0 2.0
$
$ 89.53
$ (89.53)
0%
$ 593.23
$ 184.56
$ 408.67
321%
72 Cellular Tower with Equipment Shelter
-
-
$
$ 287.34
$ (287.34)
0%
$ 593.23
$ 257.14
$ 336.09
231 %
73 Adding Antenna's to existing tower - first 5
5.0 5.0
$
$ 238.04
$ (238.04)
0%
$ -
$ 189.08
$ (189.08)
0%
74 each additional 5
4.0 4.0
$
$ 174.10
$ (174.10)
0%
$
$ 25.75
$ (25.75)
0%
75 0
-
$
$ -
$ -
0%
$
$ -
$ -
0%
76 Carport - First 200 sf
5.0 5.0
$
$ 53.58
$ (53.58)
0%
$ 233.70
$ 93.81
$ 139.89
249%
77 Carport - each additional 200 sf
5.0 5.0
$
$ 53.58
$ (53.58)
0%
$ -
$ 25.75
$ (25.75)
0%
78 0
-
$
$ -
$ -
0%
$ -
$ -
$ -
0%
79 Non Construction Certificate of Occupancy: 0 -
1,500 sf
147.0
147.0
$
$ 53.58
$ (53.58)
0%
$ 89.88
$ 393.78
$ (303.90)
23%
80 Non Construction Certificate of Occupancy: Over
1,500 sf
150.0
150.0
$
$ 54
$ (54)
0%
$ 179.77
$ 394
$ (214)
46%
81 Commercial Coach (per unit)
6.0 6.0
$
$ 54
$ (54)
0%
$ -
$ 94
$ (94)
0%
82 -
-
$
$ -
$ -
0%
$ -
$ -
$ -
0%
83 Demolition
57.0 57.0
$
$ 287
$ (287)
0%
$ 359.54
$ 94
$ 266
383%
84 -
-
$
$ -
$ -
0%
$ -
$ -
$ -
0%
85 Door - New (non structural)
35.0 35.0
$
$ 40
$ (40)
0%
$ 125.84
$ 26
$ 100
489%
86 Door - New (structural shear wall/masonry)
13.0 13.0
$
$ 40.23
$ (40.23)
0%
$ 125.84
$ 25.75
$ 100.09
489%
87 Duplicate / Replacement Job Card
38.0 38.0
$
$ -
$
0%
$ -
$ 26.71
$ (26.71)
0%
88 0
-
-
$
$
$
0%
$
$ -
$ -
0%
89 Freestanding Wall (fence)(non-masonry):
$ -
$
0%
$
$ -
$
0%
90 6 - 10 feet in height
5.0 5.0
$
$
$
0%
$ 11.98
$
$ 12
0%
91 Each additional 100 If
4.0 4.0
$
$
$
0%
$ 11.98
$
$ 11.98
0%
92 Over 10 feet in height
2.0 2.0
$
$
$
0%
$ 11.98
$
$ 11.98
0%
93 Each additional 100 If
2.0 2.0
$
$
$
0%
$ 11.98
$
$ 11.98
0%
94 Freestanding Wall (masonry):
-
$
$
$
0%
$ -
$
$ -
0%
95 up to 6' high - first 100 If
151.0
151.0
$
$
$
0%
$ 11.98
$
$ 11.98
0%
96 Each additional 100 If
12.0 12.0
$
$
$
0%
$ 11.98
$
$ 11.98
00/0
97 Over 6' high (engineered) - first 100 If
2.0 2.0
$
$
$
0%
$ 11.98
$
$ 11.98
0%
98 each additional 100 If
1.0 1.0
$
$
$
0%
$ 11.98
$
$ 11.98
00/0
99 -
-
$
$
$
0%
$ -
$
$ -
0%
100
Fireplace - Masonry
7.0 7.0
$
$
$
0%
$
$
$
0%
101
-
-
$
$
$
0%
$
$
$
0%
102
Flag pole (over 30 feet in height)
1.0 1.0
$
$
$
0%
$
$
$
00/0
103
-
-
$
$
$
0%
$
$
$
0%
104
-
-
$
$
$
0%
$
$
$
0%
105
Lighting pole
11.0 11.0
$
$
$
0%
$
$
$
0%
106
each add'I pole
220.0
220.0
$
$
$
0%
$
$
$
00/0
107
Res/Com Engineered: Deck, Patio Cover, Awning,
Balcony, Covered Porch, Enclosed Patio - First 300
sf
13.0 13.0
$
$ 220.64
$ (220.64)
0%
$ 179.77
$ 93.81
$ 85.96
192%
Wohlford Consulting Appendix 4c - Page 4 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION -RELATED FIRE FEES
Fee Service Information I I Plan Check Full Cost Results (Unit) I I Inspection Full Cost Results (Unit) Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
108
Res/Com Engineered: Deck, Patio Cover, Awning,
Balcony, Covered Porch, Enclosed Patio - Each
additional 100 sf
10.0 10.0
-
$
$
$ 220.64
$ (220.64)
0%
$ 179.77
$
$ 179.77
00/0
109
-
$ -
$
0%
$ -
$
$ -
0%
110
City Standard Patio/Deck (includes ICC products) -
First 300 sf
167.0
167.0
$
$
$
0%
$ 179.77
$
$ 179.77
0%
111
City Standard Patio/Deck (includes ICC products) -
Each additional 100 sf
100.0
100.0
$
$
$
0%
$ 179.77
$
$ 179.77
0%
112
-
$
$
$
0%
$ -
$
$ -
0%
113
Mobile Homes - Site Preparation
1.0 1.0
$
$ 53.58
$ (53.58)
0%
$
$ 93.81
$ (93.81)
0%
114
Mobile Homes - Foundation
1.0 1.0
$
$ 53.58
$ (53.58)
0%
$
$ 93.81
$ (93.81)
0%
115
Mobile Homes - Installlation
1.0 1.0
$
$ 220.64
$ (220.64)
0%
$
$ 93.81
$ (93.81)
0%
116
-
-
$
$ -
$ -
0%
$
$ -
$ -
0%
117
Partition - Commercial, Interior (up to 30 I.f.)
25.0 25.0
$
$ 53.58
$ (53.58)
0%
$ 539.30
$ 391.76
$ 147.54
138%
118
Additional partition (each 30 If)
4.0 4.0
$
$ 25.75
$ (25.75)
0%
$ 11.98
$ 206.41
$ (194.43)
6%
119
Partition - Residential, Interior (up to 30 I.f.)
2.0 2.0
$
$ 53.58
$ (53.58)
0%
$ 539.30
$ 93.81
$ 445.49
575%
120
Additional partition (each 30 If)
1.0 1.0
$
$ -
$
0%
$ 11.98
$ -
$ 11.98
00/0
121
-
-
$
$ -
$
0%
$ -
$
$ -
0%
122
Photovoltaic System:
$
$
$
$
$
0%
123
Residential Roof Mounted
557.0
$
$ 289.49
$ (289.49)
0%
$
$
$
0%
124
Residential Ground Mounted
9.0 $
$ 289.49
$ (289.49)
0%
$
$
$
0%
125
Commercial Roof Mounted
3.0 $
$ 454.27
$ (454.27)
0%
$
$ 93.81
$ (93.81)
0%
126
Commercial Ground Mounted
-
$
$ 454.27
$ (454.27)
0%
$
$ 93.81
$ (93.81)
00/0
127
$
$ -
$
0%
$
$ -
$
0%
128
Retaining Wall (concrete or masonry):
-
$
$
$
0%
$
$
$
0°/u
129
City Standard (up to 50 If)
62.0 62.0
$
$
$
0%
$
$
$
0%
130
each additional 50 If of retaining wall
12.0 12.0
$
$
$
0%
$
$
$
0%
131
Engineered first 50 If up to 8' high
31.0 31.0
$
$
$
0%
$
$
$
0%
132
Each additional 50 If
20.0 20.0
$
$
$
0%
$
$
$
0%
133
Engineered first 50 If over 8' high
10.0 10.0
$
$
$
0%
$
$
$
0%
134
Each additional 50 If
5.0 5.0
$
$
$
0%
$
$
$
00/0
135
-
$
$
$
0%
$
$
$
0%
136
Room Addition First Story up to 300 sf
20.0 20.0
$
$ 53.58
$ (53.58)
0%
$ 305.61
$ 67.58
$ 238.03
452%
137
Each additional 100 sf
11.0 11.0
$
$ -
$ -
0%
$ 17.98
$ 67.58
$ (49.60)
27%
138
Room Addition Multi Story up to 300 sf
2.0 2.0
$
$ 53.58
$ (53.58)
0%
$ 305.61
$ 67.58
$ 238.03
1 452%
139
Each additional 100 sf
2.0 2.0
$
$ -
$
0%
$ 17.98
$ 67.58
$ (49.60)
27%
140
-
-
$
$ -
$
0%
$ -
$ -
$ -
00/0
141
Remodel - Residential - up to 300 s.f.
30.0 30.0
$
$ 53.58
$ (53.58)
0%
$
$ 67.58
$ (67.58)
0%
142
Remodel - Residential - each additional 300 sf
6.0 6.0
$
$
$
0%
$
$ 67.58
$ (67.58)
00/0
143
Reroof up to 5000 sf (50 squares)
70.0 70.0
$
$ -
$
0%
$
$ 67.58
$ (67.58)
0%
144
each additional 1,000 sf (10 squares)
8.0 8.0
$
$
$
0%
$
$ 67.58
$ (67.58)
00/0
145
Sauna - steam
-
$
$
$
0%
$
$ 67.58
$ (67.58)
0%
146
-
$
$
$
0%
$
$ -
$
0%
147
Siding - Stone/Brick Veneer/ Stucco first 400 sf
17.0 17.0
$
$
$
0%
$
$
$
0%
148
Siding - each additional 400 sf
4.0 4.0
$
$
$
0%
$
$
$
0%
Wohlford Consulting Appendix 4c - Page 5 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION -RELATED FIRE FEES
Fee Service Information I I Plan Check Full Cost Results (Unit) I I Inspection Full Cost Results (Unit) Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
149
Signs:
-
-
$
$
$
0%
0%
$
$
$
0%
150
Directional
3.0 3.0
$
$
$
$
$
$
0%
151
Each additional Directional Sign
19.0 19.0
$
$
$
0%
$
$
$
0%
152
Monument
26.0 26.0
$
$
$
0%
$
$
$
0%
153
Each additional Monument Sign
4.0 4.0
$
$
$
0%
$
$
$
0%
154
Pole
1.0 1.0
$
$
$
0%
$
$
$
0%
155
Each additional Pole Sign
14.0 14.0
$
$
$
0%
$
$
$
0%
156
Wall Sign - Illuminated
112.0
112.0
$
$
$
0%
$
$
$
0%
157
Each additional Illuminated sign
52.0 52.0
$
$
$
0%
$
$
$
0%
158
Wall Non -Illuminated
19.0 19.0
$
$
$
0%
$
$
$
0%
159
Each additional Wall Sign
4.0 4.0
$
$
$
0%
$
$
$
00/0
160
-
-
$
$
$
0%
$
$
$
0%
161
Skylight - Residential (each)
$
$
$
0%
$ 359.54
$
$ 359.54
0%
162
Skylight - Commercial (each)
$
$
$
0%
$ 359.54
$
$ 359.54
0%
163
$
$
$
0%
$ -
$
$ -
0%
164
Stairs - First Flight
5.0 5.0
$
$
$
0%
$ 215.72
$
$ 215.72
0%
165
Each additional flight
1.0 1.0
$
$
$
0%
$ 215.72
$
$ 215.72
0%
166
LStorage Racks
$
EL
0%
$
$ -
$
0%
167
0-8' high (up to 100 If)
10.0 10.0
$
$ 383.94
$ (383.94)
0%
$ 359.54
$ 407.91
$ (48.37)
88%
168
each additional 100 If
7.0 7.0
$
$ 141.57
$ (141.57)
0%
$ 125.84
$ 250.11
$ (124.27)
50%
169
over 8' high (up to 100 If)
12.0 12.0
$
$ 383.94
$ (383.94)
0%
$ 359.54
$ 407.91
$ (48.37)
88%
170
each additional 100 If
10.0 10.0
$
$ 141.57
$ (141.57)
0%
$ 125.84
$ 250.11
$ (124.27)
50%
171
Swimming Pool / Spa
-
-
$
$ -
$
0%
$ -
$ -
$
0°/u
172
Vinyl -lined (up to 800 s.f.)
0.0 0.0
$
$
$
0%
$
$
$
0%
173
Fiberglass
0.0 0.0
$
$
$
0%
$
$
$
0%
174
Gunite (up to 800 s.f.)
143.0
143.0
$
$
$
0%
$
$
$
0%
175
Each additional 800 s.f.
3.0 3.0
$
$
$
0%
$
$
$
0%
176
Commercial pool (up to 800 sf)
7.0 7.0
$
$
$
0%
$
$
$
0%
177
Each additional 800 sf
3.0 3.0
$
$
$
0%
$
$
$
0%
178
-
-
$
$
$
0%
$
$
$
0%
179
Window or Sliding Glass Door
-
$
$
$
$
$
$
0%
180
Replacement First 5
39.0 39.0
$
$
$
0%
$
$
$
0%
181
Each additional 5
14.0 14.0
$
$
$
0%
$
$
$
0%
182
New window (structural shear wall/masonry) first 5
2.0 2.0
$
$
$
0%
$
$
$
0%
183
Each additional 5
2.0 2.0
$
$
$
0%
$
$
$
0%
184
-
-
$
$
$
0%
$
$
$
0%
185
Disabled Access Compliance Inspection (hourly)
12.0 12.0
$
$
$
0%
$ 179.77
$
$ 179.77
0°/0
186
Address Assignment (hourly)
28.0 28.0
$
$
$
0 o
$ 17.98
$
$ 17.98
0%
187
-
$
$
$
0%
$ -
$
$ -
0%
188
END OF BUILDING FEES
$
$
$
0%
$ w
$
$
0%
189
$
$
$
0%
$ -
$
$
0%
Wohlford Consulting Appendix 4c - Page 6 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION -RELATED FIRE FEES
Fee Service Information I I Plan Check Full Cost Results (Unit) I I Inspection Full Cost Results (Unit) Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
190
CONTRIBUTIONS TO PUBLIC WORKS FEES:
$
$
$
0%
$
$
$ -
$
$
00/0
0%
191
PUBLIC WORKS PLAN CHECK FEES
$
$
$
0%
$
192
CLEARING (per acre)
$
$
$
0%
$
$
$
0%
193
GRADING:
$
$
$
0%
$
$ -
$
0%
194
ees
$
$
$
0%
$
$
$
0%
195
SUBDIVISION PRECISE GRADING PLAN
$
$ 429.32
$ (429.32)
0%
$
$
$
0%
196
SUBDIVISION PRECISE GRADING PLAN
$
$ 429.32
$ (429.32)
0%
$
$
$
0%
197
PLAN REVISION (per sheet)
$
$ -
$
0%
$
$
$
0%
198
4th and SUBSEQUENT REVIEW (per sheet)
$
$
$
0%
$
$
$
0%
199
$
$
$
0%
$
$
$
0%
200
ON / OFF -SITE IMPROVEMENTS PLAN CHECK:
$
$
$
0%
$
$
$
00/0
201
ONSITE PLANCHECK: Percentage of Engineer's
$
$ 230.50
$ (230.50)
0%
$
$
$
0%
202
Small project: Example Size = $76,000
$
$ 270.72
$ (270.72)
0%
$
$
$
0%
203
Medium project: Example Size = $517,000
$
$ 270.72
$ (270.72)
0%
$
$
$
0%
204
Large project: Example Size = $3,055,500
$
$ 270.72
$ (270.72)
0%
$
$
$
0%
205
$
$ -
$ -
0%
$
$
$
0%
206
OFFSITE PLANCHECK Percentage of Engineer's
$
$ 230.50
$ (230.50)
0%
$
$
$
0%
207
Small project: Example Size = $ 102,000
$
$ 270.72
$ (270.72)
0%
$
$
$
0%
208
Medium project: Example Size = $ 497,500
$
$ 270.72
$ (270.72)
0%
$
$
$
0%
209
Large project: Example Size = $4,200,000
$
$ 270.72
$ (270.72)
0%
$
$
$
0%
210
$
$ -
$
0%
$
$
$
0%
211
TRAFFIC CONTROL PLAN:
$
$
$
0%
$
$ -
$
0%
212
TRAFFIC CONTROL PLAN (per
$
$
$
0%
$
$
$
00/0
213
Traffic Control Plan - 4th and each subsequent
$
$
$
0%
$
$
$
0%
214
$
$
$
0%
$
$
$
0%
215
LEGAL DOCUMENT REVIEW
$
$ -
$
0%
$
$ -
$
0%
216
Certificate of Correction
$
$
$
0%
$
$
$
0%
217
Full General Vacation
$
$
$
0%
$
$
$
0%
218
Summary Vacation
$
$
$
0%
$
$
$
0%
219
Public Dedication - not related to a map
$
$
$
0%
$
$
$
0%
220
Miscellaneous Legal Document
$
$
$
0%
$
$
$
0%
221
Certificate Of Compliance
$
$
$
0%
$
$
$
0%
222
Lot Line Adjustment
$
$ 270.72
$ (270.72)
0%
$
$
$
0%
223
Parcel Merger
$
$ -
$
0%
$
$
$
0%
224
$
$
$
0%
$
$
$
0%
225
$
$
$
0%
$
$
$
0%
226
FINAL MAP REVIEW (Parcel and Tract Maps)
$
$
$
0%
$
$
$
0°/u
227
Base Fee
$
$ 158.65
$ (158.65)
0%
$
$
$
0%
228
PER SHEET (NEW STRUCTURE)
$
$ 158.65
$ (158.65)
0%
$
$
$
0%
229
Monument Review (min)
$
$ 158.65
$ (158.65)
0%
$
$
$
0%
230
Amended Maps (Parcel and Tract) per sheet
$
$ 158.65
$ (158.65)
0%
$
$
$
Oo/u
231
Final Map - 4th and subsequent review (per sheet)
$
$ 158.65
$ (158.65)
0%
$
$
$
0%
232
$
$ -
$
0%
$
$
$
00/0
Wohlford Consulting Appendix 4c - Page 7 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION -RELATED FIRE FEES
Fee Service Information
Plan Check Full Cost Results (Unit)
Inspection Full Cost Results (Unit)
Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
233
FEMA STUDIES
$
$
$
0%
$
$
$
$
$
0%
0%
234
Conditional Letter of Map Revision (CLOMR) Review
$
$
$
0%
$
235
Letter of Map Amendment (LOMA) Review
$
$
$
0%
$
$
$
0%
236
Letter of Map Revision (LOMR) Review
$
$
$
0%
$
$
$
0%
237
Flood Certification Review [NEW FEE]
$
$
$
0%
$
$
$
0°/u
238
$
$
$
0%
$
$
$
0%
239
HYDROLOGY
$
$
$
0%
$
$
$
0%
240
Drainage tributary area up to 20 acres [NEW CATEG
$
$
$
0%
$
$
$
0%
241
Drainage tributary area over 20 acres [NEW CATEG
$
$
$
0%
$
$
$
0%
242
Hydrology Revision (NEW)
$
$
$
0%
$
$
$
0%
243
WQMP Plan Check:
$
$
$
0%
$
$
$
0%
244
SWQPM Standard
$
$
$
0%
$
$
$
0%
245
SWQPM Priority Development
$
$
$
0%
$
$
$
0%
246
WQMP Revision [NEW FEE]
$
$
$
0%
$
$
$
0%
247
$
$
$
0%
$
$
$
00/0
248
Traffic Impact Analysis:
$
$
$
0%
$
$ -
$
0%
249
Minor
$
$
$
0%
$
$
$
0%
250
Major
$
$
$
0%
$
$
$
0%
251
$
$
$
0%
$
$
$
0%
252
PARKS and MAINTENANCE:
$
$ -
$
0%
$
$ -
$
0%
253
PARKS & MAINTENANCE PLANCHECK Percentag
$
$
$
0%
$
$
$
0°/u
254
Small project: Example Size = $ 50,000
$
$
$
0%
$
$
$
0%
255
Medium project: Example Size = $ 200,000
$
$
$
0%
$
$
$
0°/u
256
Large project: Example Size = $ 750,000
$
$
$
0%
$
$
$
0%
257
$
$
$
0%
$
$
$
0%
258
PUBLIC WORKS INSPECTION FEES
$
$
$
0%
$
$
$
0%
259
CLEARING (per acre)
$
$
$
0%
$
$
$
0%
260
$
$
$
0%
$
$
$
0%
261
ON / OFF -SITE IMPROVEMENTS INSPECTION:
$
$
$
0%
$
$
$
0%
262
ONSITE INSPECTION Percentage of Engineer's Co
$
$
$
0%
$
$
$
0%
263
Small project: Example Size = $76,000
$
$
$
0%
$
$
$
0%
264
Medium project: Example Size = $517,000
$
$
$
0%
$
$
$
0%
265
Large project: Example Size = $3,055,500
$
$
$
0%
$
$
$
0°/u
266
$
$
$
0%
$
$
$
0%
267
OFFSITE INSPECTION Percentage of Engineer's C
$
$
$
0%
$
$
$
0%
268
Small project: Example Size = $ 102,000
$
$
$
0%
$
$
$
0%
269
Medium project: Example Size = $ 497,500
$
$
$
0%
$
$
$
0%
270
Large project: Example Size = $4,200,000
$
$
$
0%
$
$
$
0%
271
$
$
$
0%
$
$
$
00/0
272
Overtime - $500 deposit
$
$
$
0%
$
$
$
0%
273
$
$
$
0%
$
$
$
0%
274
PARKS AND LANDSCAPE MAINTENANCE:
$
$
$
0%
$
$ -
$
0%
275
PARKS & MAINTENANCE INSPECTION Percentag
$
$
$
0%
$
$
$
0°/0
276
Small project: Example Size = $ 50,000
$
$
$
0%
$
$
$
0%
277
Medium project: Example Size = $ 200,000
$
$
$
0%
$
$
$
0°/u
278
Large project: Example Size = $ 750,000
$
$
$
0%
$
$
$
0%
Wohlford Consulting Appendix 4c - Page 8 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION -RELATED FIRE FEES
Fee Service Information I I Plan Check Full Cost Results (Unit) I I Inspection Full Cost Results (Unit) Fee #
Fee Title
Annual
PLAN
CHECK
Revenue
Activity Level
Annual
INSPECTION
Revenue
Activity Level
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Department /
Division
Current Fee /
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
279
$
$
$
$
0%_
0%
$
$
$
00/0
280
OTHER PUBLIC WORKS FEES
$
$
$
$ -
$
0%
281
Encroachment Fees:
$
$
$
0%
$
$
$
0%
282
IlBlock Party
$
$
$
0%
$
$
$
0%
283
Driveway - Residential
$
$ 251.69
$ (251.69)
0%
$
$
$
0%
284
Driveway - Commercial
$
$ 251.69
$ (251.69)
0%
$
$
$
0%
285
Excavation: Base Fee
$
$ -
$
0%
$
$
$
0%
286
Excavation: Parallel / Street Crossing - Depth up to 5
$
$
$
0%
$
$
$
0%
287
Excavation: Parallel / Street Crossing - Depth greater
$
$
$
0%
$
$
$
0°/u
288
Utility Access
$
$ 198.82
$ (198.82)
0%
$
$
$
0%
289
Movie Filming
$
$ 323.59
$ (323.59)
0%
$
$
$
0%
290
Parkway Drain (maximum 2 per lot)
$
$ -
$
0%
$
$
$
0%
291
Street Closure
$
$
$
0%
$
$
$
0%
292
Utility Company - Annual Blanket
$
$
$
0%
$
$
$
0%
293
Haul Route
$
$
$
0%
$
$
$
0%
294
Tree Trimming
$
$
$
0%
$
$
$
0%
295
Soil Study [NEW FEE]
$
$
$
0%
$
$
$
0%
296
$
$
$
0%
$
$
$
0%
297
NPDES Fees (potential new fees):
$
$
$
0%
$
$
$
0%
298
Annual Industrial Inspection - annual service per site
$
$
$
0%
$
$
$
0%
299
Permanent BMP's Inspection (developer placed) - an
$
$
$
0%
$
$
$
0%
300
$
$
$
0%
$
$
$
0%
301
END OF LAND DEVELOPMENT FEES
$
$
$
0%
$
$
$
0%
TOTALS:
Wohlford Consulting Appendix 4c - Page 9 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION-RELAT
Fee Service Information I Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I Potential Revenue Results (Fee Services Only) Projected
Projected
Projected
Annual
Projected
Department I
Annual
Annual
Annual
Revenue
Annual
Annual
Division
Surplus /
Full Cost
Revenue at
Revenue at
Revenue
Full Cost
at Current
Revenue at
Revenue
Full Cost
Current Fee I
Full Cost
(Subsidy)
Recovery
Current Fee
Full Cost per
Surplus /
Recovery
Fee /
Full Cost
Surplus /
Recovery
Fee #
Fee Title
Deposit
per Unit
per Unit
Rate
/ Deposit
Unit
(Subsidy)
Rate
Deposit
per Unit
(Subsidy)
Rate
1 NEW OCCUPANCIES:
$
$ -
$
0%
$ -
$ -
$
0%
$ -
$
$
0%
NC - Commercial w/o interior improvements (shell) -
2 up to 5,000 sf
$ 793.38
$ 779.23
$ 14.15
102%
$
$
$
0%
$
$
$
0%
NC - Commercial w/o interior improvements (shell) -
3 5,001-15,000 sf
$ 793.38
$ 1,006.41
$ (213.03)
79%
$
$
$
0%
$
$
$
00/0
NC - Commercial w/o interior improvements (shell) -
4 15,001-50,000 sf
$ 1,804.87
$ 1,047.93
$ 756.94
172%
$ 3,610
$ 2,096
$ 1,514
172%
$ 3,610
$ 2,096
$ 1,514
172%
NC - Commercial w/o interior improvements (shell) -
each additional 1,000 sf, or portion thereof, over
5 50,000 SF
$ 35.97
$ 243.90
$ (207.93)
15%
$ 36
$ 244
$ (208)
15%
$ 36
$ 244
$ (208)
15%
6 -
$ -
$ -
$ -
0%
$
$ -
$ -
0%
$
$ -
$ -
0%
NC - Commercial with interior improvements - up to
7 5,000 sf
$ 1,808.47
$ 766.20
$1,042.27
236%
$
$ -
$ -
0%
$
$ -
$ -
0%
NC - Commercial with interior improvements - 5,001-
8 15,000 sf
$ 2,218.73
$ 1,065.70
$1,153.03
208%
$ 4,437
$ 2,131
$ 2,306
208%
$ 4,437
$ 2,131
$ 2,306
208%
NC - Commercial with interior improvements -
9 15,001-50,000 sf
$ 4,091.12
$ 1,196.42
$ 2,894.70
342%
$ 12,273
$ 3,589
$ 8,684
342%
$ 12,273
$ 3,589
$ 8,684
342%
NC - Commercial with interior improvements - each
additional 1,000 sf, or portion thereof, over 50,000
10 SF
$ 36.17
$ 243.90
$ (207.73)
15%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
11 -
$ -
$ -
$ -
0%
$
$
$
0%
$
$
$
0%
12 NC - Warehouse - up to 5,000 sf
$ 2,558.70
$ 766.20
$1,792.50
334%
$
$
$
0%
$
$
$
0%
13 NC - Warehouse - 5,001-15,000 sf
$ 2,849.12
$ 1,155.93
$1,693.19
246%
$
$
$
0%
$
$
$
0%
14 NC - Warehouse - 15,001-50,000 sf
$ 1,962.67
$ 1,241.78
$ 720.89
158%
$ 3,925
$ 2,484
$ 1,442
158%
$ 3,925
$ 2,484
$ 1,442
158%
NC - Warehouse - each additional 1,000 sf, or
15 portion thereof, over 50,000 SF
$ 51.17
$ 304.93
$ (253.76)
17%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
16 $ -
$ -
$
0%
$
$
$
0%
$
$
$
0%
17 $ -
$ -
$
01/o
$
$
$
0%
$
$
$
0%
18 NC - Commercial High Rise - up to 10,000 sf
$ 3,203.47
$ 1,444.17
$1,759.30
222%
$
$
$
0%
$
$
$
0%
19 NC - Commercial High Rise - 10,001-50,000 sf
$ 4,794.11
$ 2,010.12
$ 2,783.99
238%
$
$
$
0%
$
$
$
0%
NC - Commercial High Rise - each additional 1,000
20 sf, or portion thereof, over 50,000 SF
$ 706.79
$ 422.78
$ 284.01
167%
$
$
$
0%
$
$
$
0%
21 -
$ -
$ -
$ -
00/0
$
$
$
0%
$
$
$
0%
22 -
$ -
$ -
$ -
0%
$
$
$
0%
$
$
$
0%
23 NC - Parking Structure - up to 100,000 sf
$ 2,436.28
$ 1,192.33
$1,243.95
204%
$ 2,436
$ 1,192
$ 1,244
204%
$ 2,436
$ 1,192
$ 1,244
204%
24 NC - Parking Structure - 100,001-500,000 sf
$ 3,330.32
$ 1,803.15
$1,527.17
185%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
NC - Parking Structure - each additional 10,000 sf,
25 or portion thereof, over 500,000 SF
$ 254.07
$ 297.15
$ (43.08)
86%
$
$
$
0%
$
$
$
0%
26 0
$ -
$ -
$ -
0%
$
$
$
0%
$
$
$
0%
NC - New Single Family Custom/ Model - up to
27 1,000 sf
$ 691.51
$ 838.70
$ (147.19)
82%
$
$
$
0%
$
$
$
0%
NC - New Single Family Custom/ Model - 1,001-
28 2,500 sf
$ 691.51
$ 903.98
$ (212.47)
76%
$ 2,075
$ 2,712
$ (637)
76%
$ 2,075
$ 2,712
$ (637)
76%
NC - New Single Family Custom/ Model - 2,501-
29 5,000 sf
$ 691.51
$ 987.65
$ (296.14)
70%
$ 4,149
$ 5,926
$ (1,777)
70%
$ 4,149
$ 5,926
$ (1,777)
70%
Wohlford Consulting Appendix 4c - Page 10 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION-RELAT
Fee Service Information I Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I Potential Revenue Results (Fee Services Only) Projected
Projected
Projected
Annual
Projected
Department I
Annual
Annual
Annual
Revenue
Annual
Annual
Division
Surplus /
Full Cost
Revenue at
Revenue at
Revenue
Full Cost
at Current
Revenue at
Revenue
Full Cost
Current Fee I
Full Cost
(Subsidy)
Recovery
Current Fee
Full Cost per
Surplus /
Recovery
Fee /
Full Cost
Surplus /
Recovery
Fee #
Fee Title
Deposit
per Unit
per Unit
Rate
/ Deposit
Unit
(Subsidy)
Rate
Deposit
per Unit
(Subsidy)
Rate
NC - New Single Family Custom/ Model - each
30 additional 500 sf, or portion thereof, over 5,000 SF $ 691.51
$ 311.50
$ 380.01
222%
$ 692
$ 312
$ 380
222%
$ 692
$ 312
$ 380
2221/6
31 -
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
NC - New Single Family - Production (Tract) - up to
32 1,000 sf
$ 71.91
$ 840.80
$ (768.89)
9%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
NC - New Single Family - Production (Tract) - 1,001-
33 2,500sf
$ 71.91
$ 890.25
$ (818.34)1
8%
$ 4,314
$ 53,415
$ (49,101)
8%
$ 4,314
$ 53,415
$ (49,101)
8%
NC - New Single Family - Production (Tract) - 2,501-
34 5,000 sf
$ 71.91
$ 828.04
$ (756.13)
9%
$ 2,013
$ 23,185
$ (21,172)
9%
$ 2,013
$ 23,185
$ (21,172)
9%
NC - New Single Family - Production (Tract) - each
35 additional 500 sf, or portion thereof, over 5,000 SF $ 71.91
$ 212.60
$ (140.69)
34%
$ -
$ -
$
0%
$ -
$ -
$
0%
36 $ -
$ -
$ -
00/0
$
$
$
0%
$
$
$
0%
37 NC - Apartments/Multi- Family - up to 5,000 sf
$ 635.18
$ 1,003.77
$ (368.59)
63%
$
$
$
0%
$
$
$
0%
38 NC - Apartments/Multi- Family - 5,001-10,000 sf
$ 940.79
$ 1,336.20
$ (395.41)
70%
$
$
$
0%
$
$
$
0%
39 NC - Apartments/Multi- Family - 10,001-15,000 sf
$ 921.01
$ 1,484.56
$ (563.55)
62%
$
$
$
0%
$
$
$
0%
NC - Apartments/Multi- Family - each additional
40 1,000 sf, or portion thereof, over 15,000 SF
$ 10.61
$ 347.45
$ (336.84)
3%
$
$
$
0%
$
$
$
0%
41 $ -
$ -
$ -
0%
$
$
$
0%
$
$
$
0%
42 NC - Hotels/Motels - up to 10,000 sf
$ 940.79
$ 1,336.20
$ (395.41)
70%
$
$
$
0%
$
$
$
0%
43 NC - Hotels/Motels - 10,001-50,000 sf
$ 1,403.39
$ 1,619.18
$ (215.79)
87%
$ 1,403
$ 1,619
$ (216)
87%
$ 1,403
$ 1,619
$ (216)
87%
NC - Hotels/Motels - each additional 1,000 sf, or
44 portion thereof, over 50,000 SF
$ 28.04
$ 392.33
$ (364.29)
7%
$ 28
$ 392
$ (364)
7%
$ 28
$ 392
$ (364)
7%
45 $ -
$ -
$ -
0%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
46 TI - Tenant Improvements - up to 2,500 sf
$ 894.65
$ 869.18
$ 25.47
103%
$ 65,309
$ 63,450
$ 1,859
103%
$ 65,309
$ 63,450
$ 1,859
103%
47 TI - Tenant Improvements - 2,501- 5,000 sf
$ 1,122.35
$ 943.36
$ 178.99
119%
$ 44,894
$ 37,734
$ 7,160
119%
$ 44,894
$ 37,734
$ 7,160
119%
48 TI - Tenant Improvements - 5,001-20,000 sf
$ 1,903.14
$ 1,181.56
$ 721.58
161 %
$ 60,901
$ 37,810
$ 23,091
161 %
$ 60,901
$ 37,810
$ 23,091
161 %
TI - Tenant Improvements - each additional 1,000 sf,
49 or portion thereof, over 20,000 SF
$ 376.31
$ 347.45
$ 28.86
108%
$ 3,387
$ 3,127
$ 260
108%
$ 3,387
$ 3,127
$ 260
108%
50 $ -
$ -
$ -
0%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
NC - OSHPOD Category 2 and above (Surgery
51 Centers, Dialysis) - up to 5,000 sf
$ 888.05
$ 1,079.52
$ (191.47)
82%
$
$
$
0%
$
$
$
0%
NC - OSHPOD Category 2 and above (Surgery
52 Centers, Dialysis) - 5,001-15,000 sf
$ 2,424.47
$ 1,227.88
$1,196.59
197%
$
$
$
0%
$
$
$
0%
NC - OSHPOD Category 2 and above (Surgery
53 Centers, Dialysis) - 15,001-50,000 sf
$ 2,217.14
$ 1,510.86
$ 706.28
147%
$
$
$
0%
$
$
$
0%
NC - OSHPOD Category 2 and above (Surgery
Centers, Dialysis) - each additional 1,000 sf, or
54 portion thereof, over 50,000 SF
$ 177.37
$ 401.49
$ (224.12)
44%
$
$
$
0%
$
$
$
0%
55 $ -
$ -
$ -
0%
$
$
$
0%
$
$
$
0%
TI - OSHPOD Category 2 and above (i.e. Surgery
56 Centers, Dialysis) - up to 5,000 sf
$ 1,594.75
$ 1,080.15
$ 514.60
148%
$
$
$
0%
$
$
$
0%
TI - OSHPOD Category 2 and above (i.e. Surgery
57 Centers, Dialysis) - 5,001-15,000 sf
$ 1,842.83
$1,227.88
$ 614.95
150%
$
$
$
0%
$
$
$
0%
TI - OSHPOD Category 2 and above (i.e. Surgery
58 Centers, Dialysis) - 15,001-50,000 sf
$ 3,216.29
$ 1,510.86
$1,705.43
213%
$
$
$
0%
$
$
$
0%
Wohlford Consulting Appendix 4c - Page 11 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION-RELAT
Fee Service Information i Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I Potential Revenue Results (Fee Services Only) Projected
Projected
Projected
Annual
Projected
Department I
Annual
Annual
Annual
Revenue
Annual
Annual
Division
Surplus /
Full Cost
Revenue at
Revenue at
Revenue
Full Cost
at Current
Revenue at
Revenue
Full Cost
Current Fee I
Full Cost
(Subsidy)
Recovery
Current Fee
Full Cost per
Surplus /
Recovery
Fee /
Full Cost
Surplus /
Recovery
Fee #
Fee Title
Deposit
per Unit
per Unit
Rate
/ Deposit
Unit
(Subsidy)
Rate
Deposit
per Unit
(Subsidy)
Rate
TI - OSHPOD Category 2 and above (i.e. Surgery
Centers, Dialysis) - each additional 1,000 sf, or
59 portion thereof, over 50,000 SF
$ 31.89
$ 441.71
$ (409.82)
7%
$
$
$
0%
$
$
$
00/0
60 -
$ -
$ -
$ -
01/o
$
$
$
0%
$
$
$
0%
61 NC - UTILITY BUILDING (Garage) - up to 500 sf
$ 432.64
$ 557.70
$ (125.06)
78%
$
$
$
0%
$
$
$
0%
62 NC - UTILITY BUILDING (Garage) - 501-1,000 sf
$ 534.93
$ 606.56
$ (71.63)
88%
$ 3,210
$ 3,639
$ (430)
88%
$ 3,210
$ 3,639
$ (430)
88%
63 NC - UTILITY BUILDING (Garage) - 1,001-2,500 sf
$ 665.14
$ 652.04
$ 13.10
102%
$ 5,321
$ 5,216
$ 105
102%
$ 5,321
$ 5,216
$ 105
102%
NC - UTILITY BUILDING (Garage) - each additional
64 500 sf, or portion thereof, over 2,500 SF
$ 20.46
$ 229.54
$ (209.08)
9%
$ 20
$ 230
$ (209)
9%
$ 20
$ 230
$ (209)
9%
65 $ -
$ -
$
00 $ -
$ -
$ -
0%
$ -
$ -
$ -
0%
66 $ -
$ -
$
0%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
Wohlford Consulting Appendix 4c - Page 12 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION-RELAT
Fee Service Information I Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Department I
Division
Current Fee I
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue
at Current
Fee /
Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
67 MISCELLANEOUS BUILDING FEES (NON-MPE):
$ -
$
$ -
0%
$ -
$ -
$
0%
$
$
$
0%
68 Accessory Structure 0 to 500 sf
$
$ 528.37
$ (528.37)
0%
$
$ 4,227
$ (4,227)
0%
$
$ 4,227
$ (4,227)
0%
69 Accessory Structure 500 to 1000 sf
$
$ 577.23
$ (577.23)
0%
$
$ 6,927
$ (6,927)
0%
$
$ 6,927
$ (6,927)
0%
70 Accessory Structure 1001 sf +
$
$ 508.64
$ (508.64)
0%
$
$ 3,052
$ (3,052)
0%
$
$ 3,052
$ (3,052)
0%
71 CellularTower- free-standing
$ 593.23
$ 274.09
$ 319.14
216%
$ 1,186
$ 548
$ 638
216%
$ 1,186
$ 548
$ 638
216%
72 Cellular Tower with Equipment Shelter
$ 593.23
$ 544.48
$ 48.75
109%
$ -
$ -
$ -
0%
$ -
$ -
$ -
00/0
73 Adding Antenna's to existing tower - first 5
$ -
$ 427.12
$ (427.12)
0%
$
$ 2,136
$ (2,136)
0%
$
$ 2,136
$ (2,136)
0%
74 each additional 5
$
$ 199.85
$ (199.85)
0%
$
$ 799
$ (799)
0%
$
$ 799
$ (799)
0%
75 0
$
$ -
$ -
01/o
$
$ -
$ -
0%
$
$ -
$ -
0%
76 Carport - First 200sf
$ 233.70
$ 147.39
$ 86.31
159%
$ 1,168
$ 737
$ 432
159%
$ 1,168
$ 737
$ 432
159%
77 Carport - each additional 200 sf
$ -
$ 79.33
$ (79.33)
0%
$ -
$ 397
$ (397)
0%
$ -
$ 397
$ (397)
0%
78 0
$ -
$ -
$ -
00/0
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
79 Non Construction Certificate of Occupancy: 0 -
1,500 sf
$ 89.88
$ 447.36
$ (357.48)
20%
$ 13,213
$ 65,762
$ (52,549)
20%
$ 13,213
$ 65,762
$ (52,549)
20%
80 Non Construction Certificate of Occupancy: Over
1,500 sf
$ 179.77
$ 447.36
$ (268)
40%
$ 26,965
$ 67,104
$ (40,139)
40%
$ 26,965
$ 67,104
$ (40,139)
40%
81 Commercial Coach (per unit)
$ -
$ 147.39
$ (147)
0%
$ -
$ 884
$ (884)
0%
$ -
$ 884
$ (884)
0%
82 $ -
$ -
$ -
0%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
83 Demolition
$ 359.54
$ 380.52
$ (21)
94%
$ 20,494
$ 21,690
$ (1,196)
94%
$ 20,494
$ 21,690
$ (1,196)
94%
84 $ -
$ -
$ -
0%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
85 Door - New (non structural)
$ 125.84
$ 65.98
$ 60
191 %
$ 4,404
$ 2,309
$ 2,095
191 %
$ 4,404
$ 2,309
$ 2,095
191 %
86 Door - New (structural shear wall/masonry)
$ 125.84
$ 65.98
$ 59.86
191 %
$ 1,636
$ 858
$ 778
191 %
$ 1,636
$ 858
$ 778
191 %
87 Duplicate / Replacement Job Card
$ -
$ 26.71
$ (26.71)
0%
$ -
$ 1,015
$ (1,015)
0%
$ -
$ 1,015
$ (1,015)
0%
88 0
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
$
$ -
$ -
00/0
89 LFreestanding Wall (fence)(non-masonry):
-
0"/a
$
$
$
0%
$ -
$
$ -
0%
90 16 - 10 feet in height
$ 11.98
$
$ 12
0%
$ 60
$
$ 60
0%
$ 60
$
$ 60
0%
91 1 Each additional 100 If
$ 11.98
$
$ 11.98
0%
$ 48
$
$ 48
0%
$ 48
$
$ 48
0%
92 Over 10 feet in height
$ 11.98
$
$ 11.98
00/0
$ 24
$
$ 24
0%
$ 24
$
$ 24
0%
93 Each additional 100 If
$ 11.98
$
$ 11.98
0%
$ 24
$
$ 24
0%
$ 24
$
$ 24
0%
94 Freestanding Wall (masonry):
$
$
0%
$
$
$
0%
$
$
$ -
0%
95 up to 6' high - first 100 If
$ 11.98
$
$ 11.98
0%
$ 1,810
$
$ 1,810
0%
$ 1,810
$
$ 1,810
0%
96 Each additional 100 If
$ 11.98
$
$ 11.98
0%
$ 144
$
$ 144
0%
$ 144
$
$ 144
0%
97 Over 6' high (engineered) - first 100 If
$ 11.98
$
$ 11.98
0%
$ 24
$
$ 24
0%
$ 24
$
$ 24
0%
98 each additional 100 If
$ 11.98
$
$ 11.98
0%
$ 12
$
$ 12
0%
$ 12
$
$ 12
00/0
99 $ -
$
$ -
0%
$ -
$
$ -
0%
$ -
$
$ -
0%
100
Fireplace - Masonry
$
$
$
0%
$
$
$
0%
$
$
$
0%
101
$
$
$
0%
$
$
$
0%
$
$
$
0%
102
Flag pole (over 30 feet in height)
$
$
$
0%
$
$
$
0%
$
$
$
00/0
103
$
$
$
0%
$
$
$
0%
$
$
$
0%
104
$
$
$
0%
$
$
$
0%
$
$
$
0%
105
Lighting pole
$
$
$
0%
$
$
$
0%
$
$
$
0%
106
each add'I pole
$
$
$
0%
$
$
$
0%
$
$
$
0%
107
Res/Corn Engineered: Deck, Patio Cover, Awning,
Balcony, Covered Porch, Enclosed Patio - First 300
sf
$ 179.77
$ 314.45
$ (134.68)
57%
$ 2,337
$ 4,088
$ (1,751)
57%
$ 2,337
$ 4,088
$ (1,751)
57%
Wohlford Consulting Appendix 4c - Page 13 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION-RELAT
Fee Service Information I Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Department I
Division
Current Fee I
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue
at Current
Fee /
Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
108
Res/Corn Engineered: Deck, Patio Cover, Awning,
Balcony, Covered Porch, Enclosed Patio - Each
additional 100 sf
$ 179.77
$ 220.64
$ (40.87)
81 %
$ 1,798
$ 2,206
$ (409)
81 %
$ 1,798
$ 2,206
$ (409)
81 %
109
-
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
110
City Standard Patio/Deck (includes ICC products) -
First 300 sf
$ 179.77
$
$ 179.77
0%
$ 30,021
$
$ 30,021
0%
$ 30,021
$
$ 30,021
0%
111
City Standard Patio/Deck (includes ICC products) -
Each additional 100 sf
$ 179.77
$
$ 179.77
0%
$ 17,977
$
$ 17,977
0%
$ 17,977
$
$ 17,977
0%
112
$ -
$
$ -
0%
$ -
$
$ -
0%
$ -
$
$ -
0%
113
Mobile Homes - Site Preparation
$
$ 147.39
$ (147.39)
0%
$
$ 147
$ (147)
0%
$
$ 147
$ (147)
0%
114
Mobile Homes - Foundation
$
$ 147.39
$ (147.39)
00/0
$
$ 147
$ (147)
0%
$
$ 147
$ (147)
0%
115
Mobile Homes - Installlation
$
$ 314.45
$ (314.45)
0%
$
$ 314
$ (314)
0%
$
$ 314
$ (314)
0%
116
$
$ -
$ -
0%
$
$ -
$ -
0%
$
$ -
$ -
0%
117
Partition -Commercial, Interior (up to301.f.)
$ 539.30
$ 445.34
$ 93.96
121%
$ 13,483
$ 11,134
$ 2,349
121%
$ 13,483
$ 11,134
$ 2,349
121%
118
Additional partition (each 30 If)
$ 11.98
$ 232.16
$ (220.18)
5%
$ 48
$ 929
$ (881)
5%
$ 48
$ 929
$ (881)
5%
119
Partition - Residential, Interior (up to 30 I.f.)
$ 539.30
$ 147.39
$ 391.91
366%
$ 1,079
$ 295
$ 784
366%
$ 1,079
$ 295
$ 784
3661/6
120
Additional partition (each 30 If)
$ 11.98
$ -
$ 11.98
0%
$ 12
$ -
$ 12
0%
$ 12
$ -
$ 12
00/0
121
$ -
$ -
$ -
0%
$ -
$
$ -
0%
$ -
$ -
$ -
0%
122
Photovoltaic System:
$
0%
$
$
$
0%
$
$
$
0°/u
123
Residential Roof Mounted
$
$ 289.49
$ (289.49)
0%
$
$ 161,246
$(161,246)
0%
$
$ 161,246
$(161,246)
0%
124
Residential Ground Mounted
$
$ 289.49
$ (289.49)
0%
$
$ 2,605
$ (2,605)
0%
$
$ 2,605
$ (2,605)
0%
125
Commercial Roof Mounted
$
$ 548.08
$ (548.08)
0%
$
$ 1,363
$ (1,363)
0%
$
$ 1,363
$ (1,363)
0%
126
Commercial Ground Mounted
$
$ 548.08
$ (548.08)
0%
$
$ -
$
0%
$
$ -
$
0%
127
$
$ -
$
0%
$
$
$
0%
$
$
$
0%
128
Retaining Wall (concrete or masonry):
$
$
$
0%
$
$
$
0%
$
$
$ -
0°/u
129
City Standard (up to 50 If)
$
$
$
0%
$
$
$
0%
$
$
$
0%
130
each additional 50 If of retaining wall
$
$
$
0%
$
$
$
0%
$
$
$
0%
131
Engineered first 50 If up to 8' high
$
$
$
0%
$
$
$
0%
$
$
$
0%
132
Each additional 50 If
$
$
$
0%
$
$
$
0%
$
$
$
0%
133
Engineered first 50 If over 8' high
$
$
$
0%
$
$
$
0%
$
$
$
0%
134
Each additional 50 If
$
$
$
0%
$
$
$
0%
$
$
$
0%
135
$
$
$
0%
$
$
$
0%
$
$
$
0%
136
Room Addition First Story up to 300 sf
$ 305.61
$ 121.16
$ 184.45
252%
$ 6,112
$ 2,423
$ 3,689
252%
$ 6,112
$ 2,423
$ 3,689
252%
137
Each additional 100 sf
$ 17.98
$ 67.58
$ (49.60)
27%
$ 198
$ 743
$ (546)
27%
$ 198
$ 743
$ (546)
27%
138
Room Addition Multi Story up to 300 sf
$ 305.61
$ 121.16
$ 184.45
252%
$ 611
$ 242
$ 369
252%
$ 611
$ 242
$ 369
252%
139
Each additional 100 sf
$ 17.98
$ 67.58
$ (49.60)
27%
$ 36
$ 135
$ (99)
27%
$ 36
$ 135
$ (99)
27%
140
$ -
$ -
$ -
00/0
$ -
$ -
$ -
0%
$ -
$ -
$ -
00/0
141
Remodel - Residential - up to 300 s.f.
$
$ 121.16
$ (121.16)
0%
$
$ 3,635
$ (3,635)
0%
$
$ 3,635
$ (3,635)
00/0
142
Remodel - Residential - each additional 300 sf
$
$ 67.58
$ (67.58)
0%
$
$ 405
$ (405)
0%
$
$ 405
$ (405)
0%
143
Reroof up to 5000 sf (50 squares)
$
$ 67.58
$ (67.58)
0%
$
$ 4,731
$ (4,731)
0%
$
$ 4,731
$ (4,731)
0%
144
each additional 1,000 sf (10 squares)
$
$ 67.58
$ (67.58)
0%
$
$ 541
$ (541)
0%
$
$ 541
$ (541)
0%
145
Sauna - steam
$
$ 67.58
$ (67.58)
0%
$
$ -
$ -
0%
$
$ -
$ -
0%
146
$
$ -
$
0%
$
$
$
0%
$
$
$
0%
147
Siding - Stone/Brick Veneer/ Stucco first 400 sf
$
$
$
0%
$
$
$
0%
$
$
$
0%
148
Siding - each additional 400 sf
$
$
$
0%
$
$
$
0%
$
$
$
00/0
Wohlford Consulting Appendix 4c - Page 14 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION-RELAT
Fee Service Information i Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Department I
Division
Current Fee I
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue
at Current
Fee /
Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
149
Signs:
$
$
$
0%
$
$
$
0%
$
$
$
0%
150
Directional
$
$
$
0%
$
$
$
0%
$
$
$
0%
151
Each additional Directional Sign
$
$
$
0%
$
$
$
0%
$
$
$
0%
152
Monument
$
$
$
0%
$
$
$
0%
$
$
$
0%
153
Each additional Monument Sign
$
$
$
0%
$
$
$
0%
$
$
$
0%
154
Pole
$
$
$
0%
$
$
$
0%
$
$
$
0%
155
Each additional Pole Sign
$
$
$
0%
$
$
$
0%
$
$
$
0%
156
Wall Sign - Illuminated
$
$
$
0%
$
$
$
0%
$
$
$
0%
157
Each additional Illuminated sign
$
$
$
0%
$
$
$
0%
$
$
$
0%
158
Wall Non -Illuminated
$
$
$
0%
$
$
$
0%
$
$
$
0%
159
Each additional Wall Sign
$
$
$
0%
$
$
$
0%
$
$
$
0%
160
$
$
$
0%
$
$
$
0%
$
$
$
0%
161
Skylight - Residential (each)
$ 359.54
$
$ 359.54
0%
$
$
$
0%
$
$
$
0%
162
Skylight - Commercial (each)
$ 359.54
$
$ 359.54
0%
$
$
$
0%
$
$
$
0%
163
$ -
$
$ -
0%
$
$
$
0%
$
$
$
0%
164
Stairs - First Flight
$ 215.72
$
$ 215.72
0%
$ 1,079
$
$ 1,079
0%
$ 1,079
$
$ 1,079
0%
165
Each additional flight
$ 215.72
$
$ 215.72
0%
$ 216
$
$ 216
0%
$ 216
$
$ 216
0%
166
torage Racks
$ -
$ -
$ -
0%
$
$ -
$ -
0%
$
$
$ -
0%
167
-8' high (up to 100 If)
$ 359.54
$ 791.85
$ (432.31)
45%
$ 3,595
$ 7,919
$ (4,323)
45%
$ 3,595
$ 7,919
$ (4,323)
45%
168
additional100If
$ 125.84
$ 391.68
$ (265.84)
32%
$ 881
$ 2,742
$ (1,861)
32%
$ 881
$ 2,742
$ (1,861)
32%
169
[each
ver 8' high (up to 100 If)
$ 359.54
$ 791.85
$ (432.31)
45%
$ 4,314
$ 9,502
$ (5,188)
45%
$ 4,314
$ 9,502
$ (5,188)
45%
170
ach additional 100 If
$ 125.84
$ 391.68
$ (265.84)
32%
$ 1,258
$ 3,917
$ (2,658)
32%
$ 1,258
$ 3,917
$ (2,658)
32%
171
wimming Pool / Spa
$ -
$ -
$
0%
$ -
$ -
$
0%
$ -
$ -
$
0%
172
Vinyl -lined (up to 800 s.f.)
$
$
$
0%
$
$
$
0%
$
$
$
0%
173
Fiberglass
$
$
$
0%
$
$
$
0%
$
$
$
00/0
174
Gunite (up to 800 s.f.)
$
$
$
0%
$
$
$
0%
$
$
$
0%
175
Each additional 800 s.f.
$
$
$
0%
$
$
$
0%
$
$
$
0%
176
Commercial pool (up to 800 sf)
$
$
$
0%
$
$
$
0%
$
$
$
0%
177
Each additional 800 sf
$
$
$
0%
$
$
$
0%
$
$
$
0%
178
-
$
$
$
0%
$
$
$
0%
$
$
$
0%
179
Window or Sliding Glass Door
$
$
0%
$
$
$
0%
$
$
$
0%
180
Replacement First 5
$
$
$
0%
$
$
$
0%
$
$
$
0%
181
Each additional 5
$
$
$
0%
$
$
$
0%
$
$
$
0%
182
New window (structural shear wall/masonry) first 5
$
$
$
0%
$
$
$
0%
$
$
$
0%
183
Each additional 5
$
$
$
0%
$
$
$
0%
$
$
$
0%
184
-
$
$
$
0%
$
$
$
0%
$
$
$
0%
185
Disabled Access Compliance Inspection (hourly)
$ 179.77
$
$ 179.77
0%
$ 2,157
$
$ 2,157
0%
$ 2,157
$
$ 2,157
0%
186
Address Assignment (hourly)
$ 17.98
$
$ 17.98
0%
$ 503
$
$ 503
0%
$ 503
$
$ 503
0%
187
-
$ -
$
$ -
0%
$ -
$
$ -
0%
$ -
$
$ -
0%
188
END OF BUILDING FEES
$
$
0%
$
$
$
0%
$
$
$
189
$
$
$
0%
$
$
$
0%
$ -
$
$
1 0%
Wohlford Consulting Appendix 4c - Page 15 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION-RELAT
Fee Service Information i Total Full Cost Results (Unit) I I Full Cost Results (Annual - All Services) I Potential Revenue Results (Fee Services Only) Fee #
Fee Title
Department I
Division
Current Fee I
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue
at Current
Fee /
Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
190
CONTRIBUTIONS TO PUBLIC WORKS FEES:
$
$
$
$
0%
0%
191
PUBLIC WORKS PLAN CHECK FEES
$
$
192
CLEARING (per acre)
$
$
$
0%
193
GRADING:
$ -
$
$ -
0%
194
ees
$
$
$
00/0
195
SUBDIVISION PRECISE GRADING PLAN
$
$ 429.32
$ (429.32)
0%
196
SUBDIVISION PRECISE GRADING PLAN
$
$ 429.32
$ (429.32)
0%
197
PLAN REVISION (per sheet)
$
$ -
$
0%
198
4th and SUBSEQUENT REVIEW (per sheet)
$
$
$
0%
199
-
$
$
$
0%
200
ON / OFF -SITE IMPROVEMENTS PLAN CHECK:
$
$
$
0%
201
ONSITE PLANCHECK: Percentage of Engineer's
$
$ 230.50
$ (230.50)
0%
202
Small project: Example Size = $76,000
$
$ 270.72
$ (270.72)
0%
203
Medium project: Example Size = $517,000
$
$ 270.72
$ (270.72)
0%
204
Large project: Example Size = $3,055,500
$
$ 270.72
$ (270.72)
0%
205
-
$
$ -
$ -
0%
206
OFFSITE PLANCHECK Percentage of Engineer's
$
$ 230.50
$ (230.50)
0%
207
Small project: Example Size = $ 102,000
$
$ 270.72
$ (270.72)
0%
208
Medium project: Example Size = $ 497,500
$
$ 270.72
$ (270.72)
0%
209
Large project: Example Size = $4,200,000
$
$ 270.72
$ (270.72)
0%
210
-
$
$ -
$
0%
211
TRAFFIC CONTROL PLAN:
$ -
$
0%
212
TRAFFIC CONTROL PLAN (per
$
0%
213
Traffic Control Plan - 4th and each subsequent
$
$
$
0%
214
$
$
$
00/0
215
LEGAL DOCUMENT REVIEW
$ -
$
$ -
0%
216
Certificate of Correction
$
$
$
0%
217
Full General Vacation
$
$
$
0%
218
Summary Vacation
$
$
$
0%
219
Public Dedication - not related to a map
$
$
$
0%
220
Miscellaneous Legal Document
$
$
$
0%
221
Certificate Of Compliance
$
$
$
0%
222
Lot Line Adjustment
$
$ 270.72
$ (270.72)
0%
223
Parcel Merger
$
$ -
$
0%
224
$
$
$
0%
225
$
$
$
0%
226
FINAL MAP REVIEW (Parcel and Tract Maps)
$
$
$
0%
227
Base Fee
$
$ 158.65
$ (158.65)
0%
228
PER SHEET (NEW STRUCTURE)
$
$ 158.65
$ (158.65)
0%
229
Monument Review (min)
$
$ 158.65
$ (158.65)
0%
230
Amended Maps (Parcel and Tract) per sheet
$
$ 158.65
$ (158.65)
0%
231
Final Map - 4th and subsequent review (per sheet)
$
$ 158.65
$ (158.65)
0%
232
-
$
$ -
$ -
00/0
Wohlford Consulting Appendix 4c - Page 16 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION-RELAT
Fee Service Information
Total Full Cost Results (Unit)
Fee #
Fee Title
Department I
Division
Current Fee I
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
233
FEMA STUDIES
$
$
$
$
0%
0%
234
Conditional Letter of Map Revision (CLOMR) Review
$
$
235
Letter of Map Amendment (LOMA) Review
$
$
$
0%
236
Letter of Map Revision (LOMR) Review
$
$
$
0%
237
Flood Certification Review [NEW FEE]
$
$
$
0%
238
-
$
$
$
0%
239
HYDROLOGY
$
$
$
00/0
240
Drainage tributary area up to 20 acres [NEW CATEG
$
$
$
0%
241
Drainage tributary area over 20 acres [NEW CATEG
$
$
$
0%
242
Hydrology Revision (NEW)
$
$
$
0%
243
WQMP Plan Check:
$
$
$
0%
244
SWQPM Standard
$
$
$
0%
245
SWQPM Priority Development
$
$
$
00/0
246
WQMP Revision [NEW FEE]
$
$
$
0%
247
$
$
$
00/0
248
Traffic Impact Analysis:
$ -
$
$ -
0%
249
Minor
$
$
$
0%
250
Major
$
$
$
0%
251
$
$
$
00/0
252
PARKS and MAINTENANCE:
$ -
$
$ -
0%
253
PARKS & MAINTENANCE PLANCHECK Percentag
$
$
$
0%
254
Small project: Example Size = $ 50,000
$
$
$
0%
255
Medium project: Example Size = $ 200,000
$
$
$
0%
256
Large project: Example Size = $ 750,000
$
$
$
0%
257
$
$
$
00/0
258
PUBLIC WORKS INSPECTION FEES
$
$
$
0%
259
CLEARING (per acre)
$
$
$
0%
260
$
$
$
0%
261
ON / OFF -SITE IMPROVEMENTS INSPECTION:
$
$
$
0%
262
ONSITE INSPECTION Percentage of Engineer's Co
$
$
$
0%
263
Small project: Example Size = $76,000
$
$
$
0%
264
Medium project: Example Size = $517,000
$
$
$
0%
265
Large project: Example Size = $3,055,500
$
$
$
0%
266
-
$
$
$
0%
267
OFFSITE INSPECTION Percentage of Engineer's C
$
$
$
0%
268
Small project: Example Size = $ 102,000
$
$
$
0%
269
Medium project: Example Size = $ 497,500
$
$
$
0%
270
Large project: Example Size = $4,200,000
$
$
$
0%
271
$
$
$
00/0
272
Overtime - $500 deposit
$
$
$
0%
273
$
$
$
00/0
274
PARKS AND LANDSCAPE MAINTENANCE:
$ -
$
$ -
0%
275
PARKS & MAINTENANCE INSPECTION Percentag
$
$
$
0%
276
Small project: Example Size = $ 50,000
$
$
$
0%
277
Medium project: Example Size = $ 200,000
$
$
$
0%
278
Large project: Example Size = $ 750,000
$
$
$
0%
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only)
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Projected
Annual
Revenue
at Current
Fee /
Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
Wohlford Consulting Appendix 4c - Page 17 of 18 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
FIRE PREVENTION
RESULTS ANALYSIS - CONSTRUCTION-RELAT
Fee Service Information
Total Full Cost Results (Unit)
Fee #
Fee Title
Department I
Division
Current Fee I
Deposit
Full Cost
per Unit
Surplus /
(Subsidy)
per Unit
Full Cost
Recovery
Rate
279
-
$
$
$
0%
280
OTHER PUBLIC WORKS FEES
$ -
$
$ -
0%
281
Encroachment Fees:
$
$
$
0°/0
282
113lock Party
$
$
$
0%
283
Driveway - Residential
$
$ 251.69
$ (251.69)
0%
284
Driveway - Commercial
$
$ 251.69
$ (251.69)
0%
285
Excavation: Base Fee
$
$ -
$
0%
286
Excavation: Parallel / Street Crossing - Depth up to 5
$
$
$
0%
287
Excavation: Parallel / Street Crossing - Depth greater
$
$
$
0%
288
Utility Access
$
$ 198.82
$ (198.82)
0%
289
Movie Filming
$
$ 323.59
$ (323.59)
0%
290
Parkway Drain (maximum 2 per lot)
$
$ -
$
0%
291
Street Closure
$
$
$
0%
292
Utility Company - Annual Blanket
$
$
$
0%
293
Haul Route
$
$
$
0%
294
Tree Trimming
$
$
$
0%
295
Soil Study [NEW FEE]
$
$
$
0%
296
-
$
$
$
0%
297
NPDES Fees (potential new fees):
$
$
$
0%
298
Annual Industrial Inspection - annual service per site
$
$
$
0%
299
Permanent BMP's Inspection (developer placed) - an
$
$
$
0%
300
-
$
$
$
0%
301
END OF LAND DEVELOPMENT FEES
$
$
$
0%
TOTALS:
Full Cost Results Annual - All Services)
Projected
Annual
Revenue at
Current Fee
/ Deposit
Projected
Annual
Revenue at
Full Cost per
Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
$
$
$
0%
$ 383,361
$ 650,358
$ 266,996
59%
Revenue Totals
Potential Revenue Results (Fee Services Only)
Projected
Annual
Revenue
at Current
Fee /
Deposit
Projected
Annual
Revenue at
Full Cost
per Unit
Annual
Revenue
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
$ -
$ -
$ -
0%
$ 383,361
$ 650,358
1 $ (266,996)
q./.
Revenue Totals
Wohlford Consulting Appendix 4c - Page 18 of 18 September 28, 2023
2023 Full Cost of Services (User Fee) Study
FINAL REPORT
APPENDIX 5:
COST RESULTS FOR POLICE
The follow pages contain a summary of the results from the analysis of Police Department fee services.
Wohlford Consulting Appendix 5 - Final Results September 27, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Unit
Annual
Department /
Revenue
Division
Surplus I
Full Cost
Activity
Current Fee /
Total Full Cost
(Subsidy) per
Recovery
Fee #
Fee Title
Level
Deposit
per Unit
Unit
Rate
EXISTING POLICE FEES [These are the fees
1 on the City's fee schedule now]:
-
$ -
$ -
$ -
0%
1. ABC PERMIT (plus Fingerprint fee and state
2 or county fees, if applicable)
30.00 $ 34.00
$ 311.97
$ (277.97)
11%
3 2. CITATION COPY
2.00 $ 19.00
$ 16.77
$ 2.23
113%
3. FINGERPRINTS (per Penal Code 13300 (e)
4 rolling maximum)
2,312.00
$ 10.00
$ 50.95
$ (40.95)
20°/a
4. MASSAGE PERMIT (not a PD fee) (plus
Fingerprint fee and state or county fees, if
5 applicable)
50.00 $ 81.00
$ -
$ 81.00
0%
6 5. REPORT COPY
1,200.00
$ 26.00
$ 96.18
$ (70.18)
27%
6 SOLICITOR'S PERMIT (plus Fingerprint fee
7 and state or county fees, if applicable)
37.00 $ 34.00
$ 76.55
$ (42.55)
44%
7. TAXI DRIVER PERMIT (plus Fingerprint fee
8 and state or county fees, if applicable)
9.00 $ 81.00
$ 119.39
$ (38.39)
68%
9 8. VEHICLE RELEASE
865.00
$ 166.00
$ 175.75
$ (9.75)
94%
10 0
-
$ -
$ -
$ -
0%
11 REPOSSESSION RECOVERY FEE
236.00
$ 15.00
$ 89.83
$ (74.83)
17%
TAXI CAB INSPECTION / PERMIT (plus
Fingerprint fee and state or county fees, if
12 applicable)
5.00 $ 91.00
$ 73.06
$ 17.94
125%
13 LIVESCAN
2,500.00
$ 10.00
$ 50.95
$ (40.95)
20%
14 0
-
$ -
$ -
$
0%
15 RV permits
143.00
$
$ 47.36
$ (47.36)
0%
6 END OF POLICE FEE LIST
$
$
0%
Wohlford Consulting Appendix 5 - Page 1 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Unit
Fee #
Fee Title
Annual
Revenue
Activity
Level
Department /
Division
Current Fee /
Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
17 CONTRIBUTION OF POLICE TO INDIVIDUAL
PLANNING FEES:
$
$
$
0%
18 Adult Business
$
$
$ -
0%
19 Adult Business - Conditional Use Permit
$
$ 334.59
$ (334.59)
0%
20 Adult Business - Employee Permit
$
$ 393.86
$ (393.86)
0%
21 Adult Business - Owner Permit
$
$ 393.86
$ (393.86)
0%
22 23
jAnnexation
Annexation / Detachment (Actual Time @ Staff
Cost Recovery Hourly Rates) [calculated cost is
the potential deposit]
$
$
$
$
°
0%
24 Pre -Annexation Agreement (Actual Time @ Staff
Cost Recovery Hourly Rates) [calculated cost is
the potential deposit]
$
$
$
0%
25 Appeal
$
$
$
000
26 Appeal
$
$ 128.28
$ (128.28)
00/6
27 Bingo License
$
$ -
$ -
0%
28 Bingo License
$
$ 386.85
$ (386.85)
00/6
29 0
$
$ -
$
00/0
30 CEQA
$
$ -
$ -
0%
31 Negative Declaration (Without Mitigation)
$
$
$
00/0
32 Negative Declaration (With Mitigation)
$
$
$
0%
33 City Managed EIR
$
$
$
0°/0
34 Supplemental EIR
$
$
$
0%
35 Addendum to EIR
$
$
$
0°/0
36 Certificate Of Historical Appropriateness
$
-
$ -
0%
37 Certificate Of Historical Appropriateness
$
$
$
0°/0
38 0
$
$
$
0%
39 C75ndirional Use Permits
$
$
$
°
40 Conditional Use Permit - No Site Changes
$
$ 156.60
$ (156.60)
0%
41 Conditional Use Permit with Development Plan
$
$ 156.60
$ (156.60)
0%
42 Conditional Use Permit - Large Family Day Care
$
$ 156.59
$ (156.59)
0%
43 CUP - Modification of Existing CUP
$
$ 99.27
$ (99.27)
0%
44 CC&R Review
$
$ -
$ -
0%
45 CC&R Review (staff)
$
$
$
00/0
46 Development Agreement
$
$ -
$ -
0%
47 Development Agreement - New
$
$ 199.74
$ (199.74)
0%
48 Development Agreement - Modification
$
$ 135.96
$ (135.96)
0%
49 0
$
$ -
$
0%
50 51
Development Pla
Development Plan - Larger than 100,000 SF
$
$
$
$ 200.08
$
$ (200.08)
0%
0%
52 Development Plan - 10,000-100,000 SF
$
$ 200.08
$ (200.08)
0%
53 Development Plan - Less than 10,000 SF
$
$ 200.08
$ (200.08)
0%
54 DIF Credit Or Reduction
$
$ -
$ -
0%
55 DIF Credit Or Reduction
$
$
$
00/0
56 0
$
$
$
0%
Wohlford Consulting Appendix 5 - Page 2 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Unit
Fee #
Fee Title
Annual
Revenue
Activity
Level
Department I
Division
Current Fee /
Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
57 Extension of Time
$
$
$
0%
58 Extension Of Time - Subdivision Ordinance
$
$
$
0%
59 Extension of Time with Public Hearing or Notice
of Intent
$
$
$
0%
60 Finding of Public Convenience Or Necessity
$
$
$
00/0
61 Finding Of Public Convenience or Necessity
(without DP or CUP)
$
$
$
0%
62 Finding Of Public Convenience & or Necessity
with DP or CUP
$
$
$
0%
63 General Plan Amendment
$ ME-
$ -
0%
64 General Plan Amendment - Text Or Exhibit
$
$
$
0%
65 General Plan Amendment - Zoning & and/or
Land Map
$
$
$
00/0
66 General Plan Amendment with Fiscal Impact
Analysis
$
$
$
00/0
67 Fiscal Impact Analysis [NEW]
$
$
$
0%
68 Landscape Construction Plan
$
$
$
0%
69 Landscape Construction Plan
$
$
$
0%
70 Maps
$
$
$
0%
71 Certificate Of Compliance
$
$
$
0%
72 Condominium Conversion
$
$
$
0%
73 Condominium Map
$
$
$
0%
74 Lot Line Adjustment
$
$
$
00/0
75 Minor Change To Approved Tentative Map
$
$
$
0%
76 Parcel Merger
$
$
$
00/0
77 Phasing Plan For Tentative Map
$
$
$
0%
78 Reversion To Acreage
$
$
$
00/0
79 TPM Commercial Industrial Standard
$
$
$
0%
80 TPM Commercial Industrial with Waiver
$
$
$
0%
81 TPM Residential Standard
$
$
$
0%
82 TPM Residential wth Waiver- Final Map
$
$
$
00/0
83 TPM Revised
$
$
$
0%
84 TPM Vesting
$
$
$
00/0
85 TTM Standard - 5-34 Lots/Units
$
$
$
0%
86 TTM Standard 35+ units / lots
$
$
$
0%
87 TTM Standard - Additional Unit Fee
$
$
$
0%
88 TTM Standard Revised Map
$
$
$
0%
89 TTM Vesting 5 - 34 lots/units
$
$
$
0%
90 TTM Vesting 35+ units / lots
$
$
$
00/0
91 TTM Vesting - Additional Unit Fee
$
$
$
0%
92 TTM Vesting Revised Map
$
$
$
0%
93 0
$
$
$
0%
94 Massage Permits
$
$
0%
95 Massage Establishment Permit (including
inspection and owner fingerprints / background) -
plus DOJ fees
$
$ 359.31
$ (359.31)
0%
Wohlford Consulting Appendix 5 - Page 3 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results (Unit)
Fee #
Fee Title
Annual
Revenue
Activity
Level
Department /
Division
Current Fee /
Deposit
Total Full Cost
per Unit
Surplus /
(Subsidy) per
Unit
Full Cost
Recovery
Rate
96 Massage Establishment Permit Renewal
(including inspection and owner fingerprints /
background) - plus DOJ fees
$
$ 249.63
$ (249.63)
0%
97 Massage Technician License [This service is now
a state responsibility.]
$
$ -
qP
$
0%
98 0
$
$
$
00/0
99 Minor Exception
$
$ -
$ -
0%
100
Minor Exception - General
$
$
$
0%
101
Minor Exception - Individual Homeowner
$
$
$
0%
102
Modifications
$
$
$
0%
103
Major Modification
$
$
$
0%
104
Minor Modification
$
$
$
00/0
105
Minor Modification - Plan Review Only
$
$
$
0%
106
Minor Modification - Plan Review Only (Individual
Homeowner)
$
$
$
0%
107
108
Municipal Code A
Municipal Code Amendment
$
$
$
$
$
$
0%
0%
109
Planned Development Overlay
$
$
$
0%
110
Planned Development Overlay
$
$
$
0%
111
Planned Development Overlay - Amendment
$
$
$
0%
11 esi en Mal Tractome Product Review
-
$
$ -
$ -
°
113
1 Residential Tract Home Product Review
$
$
$
00/0
Wohlford Consulting Appendix 5 - Page 4 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Unit
Fee #
Fee Title
kAccessory
Annual
Revenue
Activity
Level
Department /
Division
Current Fee /
Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
114
Dwelling Unit
$
$
$
0%
115
ry Dwelling Unit
$
$
$
0%
116
$
$
$
0%
117
$
$
$
0%
118
Sign Program Amendment
$
$
$
0%
119
Sign Program - New
$
$
$
00/0
120
0 $
$
$
0%
121
Specific Plan
$
$
$
0%
122
Specific Plan - New
$
$
$
0%
123
Specific Plan Amendment - Major
$
$
$
0%
124
Specific Plan Amendment - Minor
$
$
$
0%
125
0 $
$
$
0%
126
127
Temporary Use Perm.
Temporary Use Permit - Minor Regular
$
$
$ 172.92
$
$ (172.92)
0%
0%
128
Temporary Use Permit - Major Regular
$
$ 224.23
$ (224.23)
0%
129
Temporary Use Permit - Major Non Profit
$
$ 172.92
$ (172.92)
0%
130
Temporary Use Permit - Minor Non Profit
$
$ 172.92
$ (172.92)
0%
131
Temporary Use Permit - Model Home Complex
$
$ 172.92
$ (172.92)
0%
132
Temporary Use Permit - Sales / Construction
Trailer
$
$ -
$
0%
133
0 $
$
$
00/0
134
Variance
$
$
$
00/0
135
Variance
$
$
$
0%
136
Vendors License
$
$
$
0%
137
Vendors License
$
$
$
0%
138
0 $
$
$
00/0
13SL
Wireless Antenna Facility
$
$ -
$ -
0%
140
Wireless Antenna Facility - Administrative
Review
$
$
$
0%
141
Wireless Antenna Facility - Revision with Public
Hearing
$
$
$
0%
142
Wireless Antenna Facility - New
$
$
$
0%
143
Zoning Letter
-
$
$ -
$ -
0%
144
Zoning Letter
$
$
$
00/0
145
End of Planning Fees
$
$
$
0%
Wohlford Consulting Appendix 5 - Page 5 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Unit
Fee #
Fee Title
Annual
Revenue
Activity
Level
Department /
Division
Current Fee /
Deposit
Total Full Cost
per Unit
Surplus I
(Subsidy) per
Unit
Full Cost
Recovery
Rate
146
NON -FEE CATEGORIES:
$
$
$
0%
147
Patrol (non -fee): Annual
$
$ 33,624,065.73
$ (33,624,065.73)
0%
148
Investigations (non -fee): Annual
$
$
$
0%
149
Dispatch (non -fee): Annual
$
$
$
0%
150
Records (non -fee) Annual
$
$
$
0%
151
Evidence (non -fee): Annual
$
$
$
0%
152
Traffic Enforcement (non -fee): Annual
$
$
$
01/6
153
Emergency Services Program (non -fee): Annual
$
$
$
0%
154
0 $
$
$
00/0
155
Building Code Enforcement - Annual
$
$
$
0%
156
Zoning Code Enforcement - Annual
$
$
$
0%
157
Nuisance Code Enforcement - Annual
$
$
$
01/6
158
Fine -Based Code Enforcement - Annual
$
$
$
0%
159
Grants and Special Projects (non -fee): Annual
$
$
$
0%
160
Community Outreach - Annual
$
$
$
0%
161
Parking - Annual
$
$
$
01/6
162
Detention Officers (non -fee): Annual
$
$
$
0%
163
Court Time - Annual
$
$
$
0%
164
City -Sponsored Events - Annual
$
$
$
0%
165
Other Animal Control Services - Annual
$
$
$
0%
166
Other Non -Fee Services - Annual
$
$
$
0%
167
0 $
$
$
0%
168
SUPPORT TO OTHER DEPARTMENT
$
$
$
0%
169
Support to Building - General (annual)
$
$
$
0%
170
Support to Planning - General (annual)
$
$
$
00/0
171
Support to Land Development / PW Engineering -
General (annual)
$
$
$
00/0
172
Support to Other Public Works - General
(annual)
$
$
$
00/0
173
Support to Fire Prevention - General (annual)
$
$
$
01/6
174
Support to Fire Operations / Suppression -
General (annual)
$
$
$
01/6
175
Support to All Other Departments (annual)
$
$
$
00/0
176
Mutual Aid and Other Support to Other Agencies
(annual)
$
$
$
00/0
177
END OF FEE LIST
r$
0%
TOTALS:
Wohlford Consulting Appendix 5 - Page 6 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only
Projected Annual
Projected Annual
Projected
Projected
Revenue at
Projected Annual
Full Cost
Revenue at
Annual Revenue
Annual
Full Cost
Current Fee /
Projected
Surplus /
Recovery
Current Fee /
at Full Cost per
Surplus /
Recovery
Fee #
Fee Title
Deposit
Annual Full Cost(Subsidy)
Rate
Deposit
Unit(Subsidy)
Rate
EXISTING POLICE FEES [These are the fees
1 on the City's fee schedule now]:
$ -
$ -
$ -
0%
$
$
$ -
00/0
1. ABC PERMIT (plus Fingerprint fee and state
2 or county fees, if applicable)
$ 1,020.00
$ 9,359.10
$ (8,339.10)
11%
$ 1,020.00
$ 9,359.10
$ (8,339.10)
11%
3 2. CITATION COPY
$ 38.00
$ 33.54
$ 4.46
113%
$ 38.00
$ 33.54
$ 4.46
1130/.
3. FINGERPRINTS (per Penal Code 13300 (e)
4 rolling maximum)
$ 23,120.00
$ 117,796.40
$ (94,676.40)
20%
$ 23,120.00
$ 117,796.40
$ (94,676.40)
20%
4. MASSAGE PERMIT (not a PD fee) (plus
Fingerprint fee and state or county fees, if
5 applicable)
$ 4,050.00
$ -
$ 4,050.00
0%
$ 4,050.00
$ -
$ 4,050.00
0%
6 5. REPORT COPY
$ 31,200.00
$ 115,416.00
$ (84,216.00)
27%
$ 31,200.00
$ 115,416.00
$ (84,216.00)
27%
6 SOLICITOR'S PERMIT (plus Fingerprint fee
7 and state or county fees, if applicable)
$ 1,258.00
$ 2,832.35
$ (1,574.35)
44%
$ 1,258.00
$ 2,832.35
$ (1,574.35)
440/.
7. TAXI DRIVER PERMIT (plus Fingerprint fee
8 and state or county fees, if applicable)
$ 729.00
$ 1,074.51
$ (345.51)
68%
$ 729.00
$ 1,074.51
$ (345.51)
68%
9 8. VEHICLE RELEASE
$ 143,590.00
$ 152,023.75
$ (8,433.75)
94%
$ 143,590.00
$ 152,023.75
$ (8,433.75)
94%
10 0
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
11 REPOSSESSION RECOVERY FEE
$ 3,540.00
$ 21,199.88
$ (17,659.88)
17%
$ 3,540.00
$ 21,199.88
$ (17,659.88)
179/.
TAXI CAB INSPECTION / PERMIT (plus
Fingerprint fee and state or county fees, if
12 applicable)
$ 455.00
$ 365.30
$ 89.70
125%
$ 455.00
$ 365.30
$ 89.70
1250/.
13 LIVESCAN
$ 25,000.00
$ 127,375.00
$ (102,375.00)
20%
$ 25,000.00
$ 127,375.00
$ (102,375.00)
20%
14 0
$ -
$ -
$ -
0%
$ -
$ -
$ -
0%
15 RV permits
$ -
$ 6,772.48
$ (6,772.48)1
0%
$
$ 6,772.48
$ (6,772.48)
0%
6 END OF POLICE FEE LIST
-
$ -
$
0%
$
-
$
0%
Wohlford Consulting Appendix 5 - Page 7 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only
Fee #
Fee Title
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full Cost(Subsidy)
Projected Annual
Surplus /
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
17 CONTRIBUTION OF POLICE TO INDIVIDUAL
PLANNING FEES:
18 Adult Business
19 Adult Business - Conditional Use Permit
20 Adult Business - Employee Permit
21 Adult Business - Owner Permit
22 JAnnexation
23 Annexation / Detachment (Actual Time @ Staff
Cost Recovery Hourly Rates) [calculated cost is
the potential deposit]
24 Pre -Annexation Agreement (Actual Time @ Staff
Cost Recovery Hourly Rates) [calculated cost is
the potential deposit]
25 Appeal
26 Appeal
27 Bingo License
28 Bingo License
29 0
30 CEQA
31 Negative Declaration (Without Mitigation)
32 Negative Declaration (With Mitigation)
33 City Managed EIR
34 Supplemental EIR
35 Addendum to EIR
36 Certificate Of Historical Appropriateness
37 Certificate Of Historical Appropriateness
38 0
39 Condi tonal Use Permits
40 Conditional Use Permit - No Site Changes
41 Conditional Use Permit with Development Plan
42 Conditional Use Permit - Large Family Day Care
43 CUP - Modification of Existing CUP
44 CC&R Review
45 CC&R Review (staff)
46 Development Agreement AW-
47 Development Agreement - New
48 Development Agreement - Modification
49 0
50 51
Development Pla
Development Plan - Larger than 100,000 SF
52 Development Plan - 10,000-100,000 SF
53 Development Plan - Less than 10,000 SF
54 DIF Credit Or Reduction
55 DIF Credit Or Reduction
56 0
Wohlford Consulting Appendix 5 - Page 8 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only
Fee #
Fee Title
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full Cost(Subsidy)
Projected Annual
Surplus /
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
57 Extension of Time
58 Extension Of Time - Subdivision Ordinance
59 Extension of Time with Public Hearing or Notice
of Intent
60 Finding of Public Convenience Or Necessity
61 Finding Of Public Convenience or Necessity
(without DP or CUP)
62 Finding Of Public Convenience & or Necessity
with DP or CUP
63 General Plan Amendment
64 General Plan Amendment - Text Or Exhibit
7 65
General Plan Amendment - Zoning & and/or
Land Map
66 General Plan Amendment with Fiscal Impact
Analysis
67 Fiscal Impact Analysis [NEW]
68 Landscape Construction Plan
69 Landscape Construction Plan
70 Maps diff-
71 Certificate Of Compliance
72 Condominium Conversion
73 Condominium Map
74 Lot Line Adjustment
75 Minor Change To Approved Tentative Map
76 Parcel Merger
77 Phasing Plan For Tentative Map
78 Reversion To Acreage
79 TPM Commercial Industrial Standard
80 TPM Commercial Industrial with Waiver
81 TPM Residential Standard
82 TPM Residential wth Waiver- Final Map
83 TPM Revised
84 TPM Vesting
85 TTM Standard - 5-34 Lots/Units
86 TTM Standard 35+ units / lots
87 TTM Standard - Additional Unit Fee
88 TTM Standard Revised Map
89 TTM Vesting 5 - 34 lots/units
90 TTM Vesting 35+ units / lots
91 TTM Vesting - Additional Unit Fee
92 TTM Vesting Revised Map
93 0
94 Massage Permits
95 Massage Establishment Permit (including
inspection and owner fingerprints / background) -
plus DOJ fees
Wohlford Consulting Appendix 5 - Page 9 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only
Fee #
Fee Title
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full Cost(Subsidy)
Projected Annual
Surplus /
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit
Projected
Annual
Surplus /
(Subsidy)
Full Cost
Recovery
Rate
96 Massage Establishment Permit Renewal
(including inspection and owner fingerprints /
background) - plus DOJ fees
97 Massage Technician License [This service is now
a state responsibility.]
98 0
99 Minor Exception
100
Minor Exception - General
101
Minor Exception - Individual Homeowner
102
Modifications
103
Major Modification
104
Minor Modification
105
Minor Modification - Plan Review Only
106
Minor Modification - Plan Review Only (Individual
Homeowner)
107
Municipal Code Amendment
108
Municipal Code Amendment
109
Planned Development Overlay ANEW-
110
Planned Development Overlay
111
Planned Development Overlay - Amendment
112
esi en isTract Home Product Review
113
1 Residential Tract Home Product Review
Wohlford Consulting Appendix 5 - Page 10 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only
Fee #
Fee Title
kAccessory
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full Cost(Subsidy)
Projected Annual
Surplus /
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
114
Dwelling Unit
115
ry Dwelling Unit
116
117
118
Sign Program Amendment
119
Sign Program - New
120
0 121
Specific Plan
122
Specific Plan - New
123
Specific Plan Amendment - Major
124
Specific Plan Amendment - Minor
125
0 126
127
Temporary Use Permi NEEMENNE-
Temporary Use Permit - Minor Regular
128
Temporary Use Permit - Major Regular
129
Temporary Use Permit - Major Non Profit
130
Temporary Use Permit - Minor Non Profit
131
Temporary Use Permit - Model Home Complex
132
Temporary Use Permit - Sales / Construction
Trailer
133
0 134
Variance
135
Variance
136
Vendors License
137
Vendors License
138
0 139
Wireless Antenna Facility
140
Wireless Antenna Facility -Administrative
Review
141
Wireless Antenna Facility - Revision with Public
Hearing
142
Wireless Antenna Facility - New
143
Zoning Letter
144
Zoning Letter
145
End of Planning Fees
Wohlford Consulting Appendix 5 - Page 11 of 12 September 28, 2023
City of TEMECULA
2023 USER FEE STUDY
UPDATED RESULTS
POLICE
RESULTS ANALYSIS
Fee Service Information
Full Cost Results Annual - All Services)
Potential Revenue Results (Fee Services Only
Fee #
Fee Title
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Full Cost(Subsidy)
Projected Annual
Surplus /
Full Cost
Recovery
Rate
Projected Annual
Revenue at
Current Fee /
Deposit
Projected
Annual Revenue
at Full Cost per
Unit(Subsidy)
Projected
Annual
Surplus /
Full Cost
Recovery
Rate
146
NON -FEE CATEGORIES:
$ -
$ -
$ -
0%
$
$
$
0%
147
Patrol (non -fee): Annual
$
$ 33,624,065.73
$ (33,624,065.73)
0%
$
$
$
0%
148
Investigations (non -fee): Annual
$
$
$
0%
$
$
$
0%
149
Dispatch (non -fee): Annual
$
$
$
0%
$
$
$
0%
150
Records (non -fee) Annual
$
$
$
0%
$
$
$
0%
151
Evidence (non -fee): Annual
$
$
$
0%
$
$
$
0%
152
Traffic Enforcement (non -fee): Annual
$
$
$
0%
$
$
$
0%
153
Emergency Services Program (non -fee): Annual
$
$
$
0%
$
$
$
0%
154
0 $
$
$
0%
$
$
$
0%
155
Building Code Enforcement - Annual
$
$
$
0%
$
$
$
0%
156
Zoning Code Enforcement - Annual
$
$
$
0%
$
$
$
0%
157
Nuisance Code Enforcement - Annual
$
$
$
0%
$
$
$
0%
158
Fine -Based Code Enforcement - Annual
$
$
$
0%
$
$
$
0%
159
Grants and Special Projects (non -fee): Annual
$
$
$
0%
$
$
$
0%
160
Community Outreach - Annual
$
$
$
0°/0
$
$
$
0°/0
161
Parking -Annual
$
$
$
0%
$
$
$
0%
162
Detention Officers (non -fee): Annual
$
$
$
0%
$
$
$
0°/0
163
Court Time - Annual
$
$
$
0%
$
$
$
0%
164
City -Sponsored Events - Annual
$
$
$
0%
$
$
$
0%
165
Other Animal Control Services - Annual
$
$
$
0%
$
$
$
0%
166
Other Non -Fee Services - Annual
$
$
$
0%
$
$
$
0%
167
0 $
$
$
0%
$
$
$
0%
168
SUPPORT TO OTHER DEPARTMENT
$
$
$
0%
$
$
$
0%
169
Support to Building - General (annual)
$
$
$
0%
$
$
$
0%
170
Support to Planning - General (annual)
$
$
$
0%
$
$
$
0°/0
171
Support to Land Development / PW Engineering -
General (annual)
$
$
$
0%
$
$
$
0°/0
172
Support to Other Public Works - General
(annual)
$
$
$
0%
$
$
$
0°/0
173
Support to Fire Prevention - General (annual)
$
$
$
0%
$
$
$
0%
174
Support to Fire Operations / Suppression -
General (annual)
$
$
$
0%
$
$
$
0%
175
Support to All Other Departments (annual)
$
$
$
0%
$
$
$
0%
176
Mutual Aid and Other Support to Other Agencies
(annual)
$
$
$
0%
$
$
$
0%
1 77
END OF FEE LIST
$
$
$
%
$
$ -
1 0%
TOTALS:
$ 234,000
1 $ 34,178,314
1 $ 33,944,314
1%
$ 234,000
1 $ 554,248
1 $ 320,248
42%
Revenue Totals
I Revenue Totals
Wohlford Consulting Appendix 5 - Page 12 of 12 September 28, 2023
Notice of Public Hearing
THE CITY OF TEMECULA
41000 Main Street
Temecula, CA 92590
A PUBLIC HEARING has been scheduled before the CITY COUNCIL to consider the matter(s) described below.
Proposal: Resolution Adopting Citywide User Fees for the City of Temecula PLACE OF HEARING: City Council Chambers, 41000 Main Street Temecula, CA 92590 DATE OF HEARING: February 27, 2024
TIME OF HEARING: 6:00 pm
Any person may submit written comments to the City Council before the hearing or may appear and be heard in support of or opposition to the approval of the project at the time of hearing.
Any petition for judicial review of a decision of the City Council shall be filed within the time required by, and controlled by, Sections 1094.5 and 1094.6 of the California Code of Civil Procedure. In any such action or proceeding seeking judicial review of, which attacks or seeks to set aside, or void any decision of the City Council, shall be limited to those issues raised at the hearing or in written correspondence delivered to the City Clerk at, or prior to, the public hearing described in this notice.
Item No. 12
CITY OF TEMECULA/TEMECULA COMMUNITY SERVICES DISTRICT
AGENDA REPORT
TO: City Council/TCSD Board
FROM: Aaron Adams, City Manager/Executive Director
DATE: February 27, 2024
SUBJECT: Approve Fiscal Year 2023-24 Mid -Year Budget Adjustments PREPARED BY: Jennifer Hennessy, Director of Finance/Treasurer RECOMMENDATION: That the City Council/Board of Directors adopt the following resolutions entitled:
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TEMECULA, AMENDING THE FISCAL YEAR 2023-24
ANNUAL OPERATING BUDGET
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TEMECULA AMENDING THE CAPITAL IMPROVEMENT
PROGRAM FISCAL YEARS 2024-28 AND AMENDING THE
CAPITAL IMPROVEMENT BUDGET FOR FISCAL YEAR
2023-24
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TEMECULA REVISING THE SALARY SCHEDULE
RESOLUTION NO. CSD
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
TEMECULA COMMUNITY SERVICES DISTRICT OF THE
CITY OF TEMECULA AMENDING THE FISCAL YEAR 2023-
24 ANNUAL OPERATING BUDGETS
BACKGROUND: In accordance with Budget Policy ILB.- Interim Reporting, City staff conducted a comprehensive Mid -Year review of its Annual Operating Budget and Capital Improvement Program Budget. The purpose of the review is to analyze revenue and expenditure
trends to identify variances from the Adopted Budget and ensure that the City maintains a healthy fiscal position. The Mid -Year Budget includes a review of all City funds. The requested adjustments are summarized in the attached exhibits and discussed in further detail below.
MID -YEAR HIGHLIGHTS:
The attached Mid -Year Budget Update reflects adjustments to revenue projections to better align with the current economy and revenue trends experienced through December 31, 2023.
Appropriation adjustments are reflected in the attached FY2023-24 Consolidated Mid -Year Requests, which summarizes each request by Fund and Department, and are described in further detail below.
Also included are four Capital Improvement Program adjustments requested due to higher than anticipated construction bids, the creation of a new project and to shift funding from FY24-25 to FY23-24.
GENERAL FUND:
General Fund Revenue includes a decrease of $6,283,815, bringing total FY23-24 Revenue to $108,028,233. Major adjustments by revenue category are noted below:
• Sales Tax — decrease of $1.5 million to reflect current trend in sales tax receipts, which are coming in below budget projections and below the prior year. • Transient Occupancy Tax (TOT) — increase of $700,000 to reflect a payment plan for a major hotel who had prior year delinquencies. Overall, TOT revenue is flat compared to the prior year.
• Land Development/Building/Fire — decrease of $1,056,045 due to less permit/building activity than anticipated.
• Transfers In — decrease of $4.5 million from Measure S due to the reduced need to utilize Measure S to balance the General Fund, plus a decrease of $162,488 from the Gas Tax Fund due to lower Gas Tax revenue projected by the State.
General Fund Expenditures include a decrease of $3,905,666, bringing total Expenditures and Transfers Out to $118,427,688. Major adjustments by expenditure category are noted below:
• Salaries and Benefits — decrease of $389,077 to reflect net salary savings realized through December 31, 2023.
• Operations and Maintenance — increase of $40,578 due primarily to increased legal services, offset by decreases in consulting costs.
• Internal Service Fund Allocations — decrease of $209,693 to reflect corrections made to the Adopted Budget ISF allocation amounts.
• Transfers Out — decrease of $3,337,474 for the pay down of the Other Post Employment Benefits (OPEB) unfunded liability. The unfunded liability amount was decreased in the latest actuarial valuation report received in January 2024, as a result of favorable investment earnings and prior contributions to the OPEB Trust.
General Fund Ending Fund Balance is projected to be $35,902,924, with Reserves fully - funded at $24,106,546. With revenues exceeding operating expenditures each year, the General
Fund is structurally balanced and reserves are fully funded over the ensuing five years.
As illustrated on the chart, the decline in Fund Balance from 2021-22 shows the paydown of the Civic Center and MRC facility debt, as well as the additional contribution to the City's unfunded pension liability with Ca1PERS, in accordance with the Council -approved Debt/Liability Paydown Strategy
adopted in December General Fund 5-Year Projections
2022. The Strategy is 60,000,000 Fund Balance Trend
revisited twice per 50,000,000
year to account for
40,000,000
changes in the
unfunded liability, as 30,000,000
calculated by 20,000,000
Ca1PERS. The City 10,000,000
is still on track to be
debt/liability free in
seven years.
MEASURE S FUND:
019-19 019-20 OP-21 011-11 FV22-2� FV23'24 F42445 p425-26 FY26-2'I EV20.ZS Fund Balance -Funded Reserve O Desired Reserve
Measure S Revenue includes an decrease of $200,988, bringing total FY23-24 Revenue to $39,841,800, which reflects a 0.5% decrease from the prior year.
Measure S Expenditures include a decrease of $5,623,109, bringing total FY23-24 Expenditures to $69,267,468. Mid -Year adjustments include a reduction in the transfer to TCSD of $1,049,830 as the TCSD beginning fund balance was higher than anticipated; a reduction in the transfer to the General Fund of $4.5 million is included as the General Fund balanced without this transfer.
As illustrated in the pie chart, and in
accordance with Council's Measure S
Appropriation Guidelines, a total of 65% of
Measure S appropriations are allocated to
fund Capital Projects, 20% is allocated to
fund Community Services, 8% is allocated
to fund Police and Fire services and the
remaining 7% is allocated to the City's
various asset replacement funds.
Total Measure S Ending Fund Balance is
estimated to be $16,566,671.
Measure 5 - FY23-24 Appropriations
$69,267,468
BPECIAL REVENUE & DEBT SERVICE
The City maintains 17 separate Special Revenue Funds and two Debt Service Funds. Activities in these funds are legally required to be accounted for in separate and distinct funds. Below is a summary of the major Mid -Year requests for each Special Revenue and Debt Service Funds.
Gas Tax reflects the reduction of $162,525 in revenue and transfers, per the estimates received from the State. These funds are transferred to the General Fund to support street and road maintenance.
Road Maintenance Rehabilitation Account (RMRA) reflects the reduction of $78,381 in revenue, per the estimates received from the State.
NPDES In Lieu Fees reflect a reduction of $878,581 in revenue as the project anticipated in the Adopted Budget to create these fees will not occur this fiscal year.
Uptown Temecula New Streets In Lieu Fees revenue reflect an increase of $255,648, related to development activity occurring in the Uptown Temecula area.
Development Impact Fee revenue reflects a reduction of $949,104 due to delays in development projects.
Community Development Block Grant reflects an increase of $1,604,087 in revenue to cover the roll-over of prior year Capital Project expenditures.
Affordable Housing reflects an increase of $219,341 in revenue to reflect the payment of Residual Receipts from an affordable housing complex not anticipated in the Adopted Budget.
Measure A reflects an increase of $55,868 in revenue to reflect interest earnings.
INTERNAL SERVICES FUNDS:
The City has nine Internal Service Funds, used to account for services provided internally between departments. Below is a summary of the major Mid -Year requests for the Internal Service Funds.
Insurance Fund reflects an increase of $600,000 in expenditures as a result of higher litigation claim activity than anticipated in the Adopted Budget.
Technology Replacement Fund reflects an decrease of $500,000 in revenue from a Measure S contribution, as adequate reserves have accumulated in this fund for the future replacement of technology equipment.
Facilities Replacement Fund reflects an increase of $500,000 in revenue from Measure S, previously budgeted to the Technology Replacement Fund, in order to increase the reserve balance in the Facilities Replacement Fund.
TEMECUI4 COMMUNITY SERVICES DISTRICT (TfISD) FUNDS
TCSD Operations Fund reflect a decrease of $874,586 in revenue, mostly due to the decreased Measure S transfer due to a higher than anticipated beginning fund balance. A decrease in expenditures of $389,085 is reflected due to a correction to the Internal Services Fund allocation amounts included in the Adopted Budget.
TCSD Ending Fund Balance is projected to be $100,004 for Fiscal Year 2023-24. tTPITAL IMPROVEMENT P$LURAM
Adjustments to the Fiscal Years 2024-28 Capital Improvement Program include the following:
• Nicolas Road Multi -Use Trail Extension — reflects an increase of $1,050,000 in construction costs, funded with an increase of $600,000 from Measure A and $450,000 from Assembly Bill 2766 which is being transferred from the Bike Lane and Trail — Citywide capital project.
• Traffic Signal — Safety Lights and Signal Communications Upgrade - Citywide — reflects an increase of $114,503 in funding, advanced from Fiscal Year 2024-25; $29,580 in HSIP grant funding and $84,923 in DIF-Traffic Signal funding.
The following new projects are recommended to be added to the CIP:
• Temecula Creek Fencing — reflects the transfer of $500,000 in funding from the Community Reinvestment Fund from the Operating Budget to the Capital Budget.
The new Capital Project will include the construction of a commercial grade wrought iron fence along the north side of Temecula Creek, between Pechanga Parkway and east of Jedediah Smith Road.
� YEAR 2024-25
In accordance with Compensation Adjustments section in both the Memorandum of Understanding Between the City of Temecula and Teamsters Local 911 and the Management Compensation Plan, an annual cost of living adjustment (COLA) will be provided on July 1, 2024. The COLA is calculated based on the lesser of (1) the annual percentage change in the Consumer Price Index for Urban and Clerical Workers (CPI-W) for all items in Riverside -San Bernardino -Ontario, CA for the prior calendar year as compared to the annual CPI-W of two calendar years prior, or (2) the percentage change in Recurring Revenue of the City's primary operating funds of the prior fiscal year as compared to two fiscal years prior.
For July 1, 2024, the COLA has been calculated to be 4.4%, which was lower than the 4.5% change in Recurring Revenue. This adjustment is applied to the base salary for all eligible employees and is reflected in the attached Salary Schedule.
FISCAL IMPACT: The Fiscal impact of each fund is noted in the attached Exhibits.
ATTACHMENTS: 1.
Summary of FY 2023-24 Mid -Year Appropriation Requests
2. Resolution — City Mid -Year Budget Amendments
3. Exhibits A, B and C — City Fund Summaries
4. Resolution — TCSD Mid -Year Budget Amendments
5. Exhibit A — TCSD Fund Summaries
6. Resolution - Capital Improvement Program and Mid -Year Budget Amendments
7. Exhibit 1 — Mid -Year Capital Improvement Program
Amendments
8. Resolution - Revising the Salary Schedule
9. Salary Schedule
City of Temecula
FY 2023-24 Mid -Year Requests
Account
EXPENDITURE ADJUSTMENTS
Adjusted Revised
2023-24 Mid -Year 2023-24
Description Budget Request Budget
Comments/Justification
001.100.999.5540
Information Technology
143,411
(9,735)
133,676
Correction to ISF allocation clerical error during AOB. (9,735)
001.110.999.5101
Deferred Compensation
64,813
25,000
89,813
To cover council approved City Manager employment agreement 001.110.999.5535
Vehicles and Equipment
8,828
(4,414)
4,414
To correct ISFs double charged in AOB
001.110.999.5540
Information Technology
199,009
76,895
275,904
Correction to ISF allocation clerical error during AOB. 97,481
001.111.999.5100
Salaries & Wages
540,854
7,410
548,264
Additional budget needed per 5100 analysis; step increases higher than budgeted 001.111.999.5540
Information Technology
164,846
(67,243)
97,603
Correction to ISF allocation clerical error during AOB. (59,833)
001.111.406.5540
Information Technology
71,009
(45,944)
25,065
Correction to ISF allocation clerical error during AOB. (45,944)
Emergency Management
001.115.999.5540
Information Technology
154,612
45,903
200,515
Correction to ISF allocation clerical error during AOB. 45,903
001.120.999.5100
Salaries & Wages
610,942
4,014
614,956
Additional budget needed per 5100 analysis; step increases higher than budgeted 001.120.999.5540
Information Technology
188,514
(99,364)
89,150
Correction to ISF allocation clerical error during AOB. (95,350)
001.130.999.5246
Legal Services - General
875,000
120,000
995,000
Actuals through December trending high (roughly $80K per month) 120,000
001.140.999.5100
Salaries & Wages
1,888,463
8,458
1,896,921
Additional budget needed per 5100 analysis; step increases higher than budgeted 001.140.999.5540
Information Technology
277,163
(40,379)
236,784
Correction to ISF allocation clerical error during AOB. (31,921)
001.150.999.5100
Salaries & Wages
597,175
11,896
609,071
Additional budget needed per 5100 analysis; step increases higher than budgeted 001.150.999.5247
Legal Services - HR
79,560
75,000
154,560
To cover Pensegara and other legal inquiries
001.150.999.5248
Consulting Services
137,392
20,000
157,392
To cover Norm Traub balance for remainder of Fiscal Year 001.150.999.5432
Health Flex Forfeiture
240,761
4,025
244,786
To true up amount received 7/1-12/31/23 and current trend ($14,646/mo) 001.150.999.5540
Information Technology
138,373
(32,512)
105,861
Correction to ISF allocation clerical error during AOB. 001.150.999.5610
Equipment
10,000
(10,000)
-
NeoGov Power Policy budgeted here, but paid for by IT. IT confimed they do not need this transferred to their fund.
68,409
City of Temecula
FY 2023-24 Mid -Year Requests
Account
Description
Adjusted
2023-24
Budget
Mid -Year
Request
Revised
2023-24
Budget
Comments/Justification
001.161.999.5100
Salaries & Wages
1,257,798
(2,368)
1,255,430
Estimated vacancy savings through 1/31/24, reduced by 5100 analysis 001.161.999.5248
Consulting Services
647,796
(50,000)
597,796
Okay to reduce by $50,000 per Brandon
001.161.999.5540
Information Technology
381,782
70,159
451,941
Correction to ISF allocation clerical error during AOB. 17,791
Code Enforcement
001.162.611.5440
Weed Abatement
72,519
77,481
150,000
Current actuals close to 100% of budget. Budget previously increased in FY22-23 due to shift from PW to Code, but that increase was not reflected in the AOB baseline budget. 001.162.611.5535
Vehicles and Equipment
34,379
(17,838)
16,541
To correct ISFs double charged in AOB
001.162.611.5540
Information Technology
146,769
76,156
222,925
Correction to ISF allocation clerical error during AOB. 135,799
Building & Safety
001.162.999.5100
Salaries & Wages
1,598,345
(108,757)
1,489,588
Estimated vacancy savings through 1/31/24, reduced by 5100 analysis 001.162.999.5535
Vehicles and Equipment
32,365
(16,828)
15,537
To correct ISFs double charged in A013
001.162.999.5540
Information Technology
304,613
(17,602)
287,011
Correction to ISF allocation clerical error during AOB. (143,187)
Public Works Land Dev
Public Works Land Dev
001.163.999.5100
Salaries & Wages
921,606
(55,159)
866,447
Estimated vacancy savings through 1/31/24, reduced by 5100 analysis 001.163.999.5535
Vehicles and Equipment
14,398
(7,700)
6,698
To correct ISFs double charged in AOB
001.163.999.5540
Information Technology
182,351
(26,166)
156,185
Correction to ISF allocation clerical error during AOB. (89,025)
Public Works Streets
001.164.601.5100
Salaries & Wages
1,109,133
(24,369)
1,084,764
Estimated vacancy savings through 1/31/24, reduced by 5100 analysis 001.164.601.5535
Vehicles and Equipment
256,279
(127,309)
128,970
To correct ISFs double charged in AOB
001.164.601.5540
Information Technology
519,949
858,788
1,378,737
Correction to ISF allocation clerical error during AOB. 707,110
Public Works - Traffic Engineering
001.164.602.5248
Consulting Services
139,608
(17,500)
122,108
Okay to reduce by $17,500 to offset requested increase to 190.180.164.5218 ($15,000) and (17,500)
Public Works NPDES Compliance
001.164.605.5100
Salaries & Wages
220,484
(75,988)
144,496
Estimated vacancy savings through 1/31/24, reduced by 5100 analysis (75,988)
001.165.999.5100
Salaries & Wages
1,963,797
10,478
1,974,275
Additional budget needed per 5100 analysis; step increases higher than budgeted 001.165.999.5535
Vehicles and Equipment
10,942
(2,996)
7,946
To correct ISFs double charged in AOB
001.165.999.5540
Information Technology
227,867
(35,511)
192,356
Correction to ISF allocation clerical error during AOB. (28,029)
Public Works Parks Main
001.167.999.5100
Salaries & Wages
916,233
(5,421)
910,812
Estimated vacancy savings through 1/31/24, reduced by 5100 analysis 001.167.999.5535
Vehicles and Equipment
56,794
(22,072)
34,722
To correct ISFs double charged in AOB
001.167.999.5540
Information Technology
66,945
(11,214)
55,731
Correction to ISF allocation clerical error during AOB. 001.167.999.5555
Facilities Replacement
28,403
(15,400)
13,003
To correct ISFs double charged in AOB
(54,107)
City of Temecula
FY 2023-24 Mid -Year Requests
Adjusted
Revised
2023-24
Mid -Year
2023-24
Account
Description
Budget
Request
Budget
Comments/Justification
001.170.999.5288
Sworn Staff
24,859,535
(145,000)
24,714,535
Estimated vacancy savings through BP #6, offset by administrative transfers (Total savings of $246K through 12/13/23 reduced by $78K transfer to Project (5119) line, and previous administrative adjustments totalling $23K)
001.170.999.5370
Special Events
88,116
(44,058)
44,058
Okay to reduce by 50%, per Toni
001.170.999.5535
Vehicles and Equipment
7,698
(3,849)
3,849
To correct ISFs double charged in AOB
001.170.999.5540
Information Technology
723,109
(408,282)
314,827
Correction to ISF allocation clerical error during AOB. (601,189)
001.171.710.5540
Information Technology
302,246
(212,900)
89,346
Correction to ISF allocation clerical error during AOB. 001.171.999.5535
Vehicles and Equipment
416,426
(205,463)
210,963
To correct ISFs double charged in AOB
001.171.999.5540
Information Technology
187,241
99,672
286,913
Correction to ISF allocation clerical error during AOB. 001.171.999.5555
Facilities Replacement
13,090
(6,545)
6,545
To correct ISFs double charged in AOB
(325,236
'mal Contro
001.172.999.5456
Animal Control Services
128,520
630
129,150
Increase to reflect updated contract costs for the Animal Friends of the Valley (AFV) agreement 630
Non -Departmental
001.199.999.7700 Transfer Out to GASB 45 6,591,474 (3,337,474) 3,254,000 Reduce to reflect recalculation of OPEB Unfunded Liability, per Foster & Foster (3,337,474)
• •
002.199.999.7325
Transfer Out to Fund 325
500,000
(500,000)
-
Redirect Transfer Out to F325 - Tech Replacement to F350 - Facilities Replacement instead 002.199.999.7001
Transfer Out to Fund 001
9,730,205
(4,500,000)
5,230,205
Reduce Transfer Out to F001- General Fund, due to accumulated fund balance 002.199.999.7190
Transfer Out to Fund 190
14,304,232
(1,049,830)
13,254,402
Reduce Transfer Out to F190 - TCSD Operations, due to accumulated fund balance 002.199.999.7197
Transfer Out to Fund 197
975,563
(73,279)
902,284
Reduce Transfer Out to F197 - TCSD Operations, due to accumulated fund balance 002.199.999.7350
Transfer Out to Fund 350
-
500,000
500,000
Redirect Transfer Out to F325 - Tech Replacement to F350 - Facilities Replacement instead (5,623,109)
TOTAL•
City of Temecula
FY 2023-24 Mid -Year Requests
Adjusted Revised
2023-24 Mid -Year 2023-24
Account Description Budget Request Budget Comments/Justification
SPECIAL REVENUE FUNDS
COVID-19 Pandemic Community Reinvestment Program
110.199.104.5409 Property Maintenance 500,000 (500,000) - Moving to CIP to fund new project: Temecula Creek Fencing 110.199.107.5267 Community Grants 955,538 29,223 984,761 Adjustment to Higher Education/Workforce Development, for CSUSM Agreement and to reimburse Administrative Supports expenditures.
(470,777)
TOTAL CRP FUND (470,777)
Affordable Housing
165.199.999.5248 Consulting Services 30,600 (20,600) 10,000 Okay to reduce down to $10,000 per Brandon 165.199.999.5540 Information Technology 20,448 (3,738) 16,710 Correction to ISF allocation clerical error during AOB. (24,338)
TOTAL
SERVICES DISTRICT (TCSD)
TCSD Operations
190.180.999.5535
Vehicles and Equipment
55,032
(24,491)
30,541
To correct ISFs double charged in AOB
190.180.999.5540
Information Technology
1,677,136
(398,362)
1,278,774
Correction to ISF allocation clerical error during AOB. 190.180.999.5555
Facilities Replacement
111,647
(43,298)
68,349
To correct ISFs double charged in AOB
190.180.999.7110
Transfer Out to CRP Fund
-
37,709
37,709
To reimburse CRP fund for administrative charges FY21-22 to FY23-24 (428,442)
TCSD Operations Maintenanc
190.180.164.5218
Maintenance Supplies
30,100
15,000
45,100
Increase to cover janitorial supply needs. Offset by reduction in 001.164.602.5248. 15,000
WD Senior and I
190.181.999.5413
Summer Food Service Program
11,596
5,000
16,596
For expansion of the Summer Food Service Program; will be reimbursed through revenue 5,000
190.183.999.5370
Special Events
920,918
19,360
940,278
To restore budget to last FY amount and properly fund all planned events for FY23-24 197.180.999.5555 Facilities Replacement 21,532 (10,766) 10,766 To correct ISFs double charged in AOB (10,766)
Library Maintenance
197.180.164.5218 Maintenance Supplies 5,100 2,500 7,600 Increase to cover janitorial supply needs. Offset by reduction in 001.164.602.5248. 2,500
198.199.999.5424 Public Monuments 55,000 55,000 Requested by PW for various monuments/plaques 55,000
TCSD Total (327,348)
City of Temecula
FY 2023-24 Mid -Year Requests
Adjusted
Revised
2023-24
Mid -Year
2023-24
Account Description
Budget
Request
Budget Comments/Justification
INTERNAL SERVICE FUNDS
Insurance Fund
300.199.999.5246 Legal Services General
325,000
600,000
925,000 Trending at $82,000 per month; estimated $985,000 for entire fiscal year. Higher litigation activity than anticipated.
600,000
ISF Information Technology
320.199.999.5100 Salaries & Wages
1,428,926
(30,137)
1,398,789 Estimated vacancy savings through 1/31/24, reduced by 5100 analysis 320.199.999.5535 Vehicles and Equipment 5,320 (2,660) 2,660 To correct ISFs double charged in AOB (32,797)
320.620.999.5100 Salaries & Wages 150,113 (5,034) 145,079 Estimated vacancy savings through 1/31/24, reduced by 5100 analysis (5,034)
Facilities - All City Faciliti
340.199.164.5100 Salaries & Wages 359,215 (8,938) 350,277 Estimated vacancy savings through 1/31/24, reduced by 5100 analysis (8,938)
TOTAL INTERNAL SERVICE FUNDS
RESOLUTION NO. 2024-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TEMECULA, AMENDING THE FISCAL YEAR 2023-24
ANNUAL OPERATING BUDGET
THE CITY COUNCIL OF THE CITY OF TEMECULA DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. The purpose of this review is to conduct an analysis of revenues and expenditures to ensure that the City maintains a prudent and healthy fiscal position.
Section 2. That each year a mid -year review is conducted of City operating budgets.
Section 3. That the mid -year review has been completed and the recommended adjustments are reflected in the attached schedules for the City's General Fund, Special Revenue, Debt Service and Internal Services Funds.
Section 4. That the Fiscal Year 2023-24 General Fund and Measure S Fund Annual Operating Budgets are hereby amended in accordance with the attached Exhibit A, General Fund Fiscal Year 2023-24 Mid -Year Budget.
Section 5. That the Fiscal Year 2023-24 Special Revenue Funds Annual Operating Budgets are hereby amended in accordance with the attached Exhibit B — Special Revenue and Debt Service Funds Fiscal Year 2023-24 Mid -Year Budget.
Section 6. That the Fiscal Year 2023-24 Internal Services Funds Annual Operating Budgets are hereby amended in accordance with the attached Exhibit C, Internal Services Funds Fiscal Year 2023-24 Mid -Year Budget.
Section 9. The City Clerk shall certify adoption of the resolution.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of Temecula this 27th day of February, 2024.
James Stewart, Mayor
ATTEST:
Randi Johl, City Clerk
[SEAL]
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss
CITY OF TEMECULA )
I, Randi Johl, City Clerk of the City of Temecula, do hereby certify that the foregoing Resolution No. 2024- was duly and regularly adopted by the City Council of the City of Temecula at a meeting thereof held on the 27th day of February, 2024, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
Randi Johl, City Clerk
EXHIBIT A
General
Fund
&
Measure
S
Fund
Alk
The Heart of Southern California
Wine Country
FUND: 001 - GENERAL FUND
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
% Change
2023-24 Year to Date 2023-24 Q2 from
2022-23 Current Actuals Revised Requested Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget Revenues by Source
Taxes and Franchises
Property Tax
Sales Tax
Sales Tax Sharing Agreement
Franchise Fees
Transient Occupancy Tax
Special Tax (Measure C)
Licenses, Permits and Service Charges
Charges For Services
Business Licenses
Land Development
Parks Maintenance
Building
Planning
Police
Fire
Development Fees
Fines and Forfeitures
Fines & Forfeitures
Use of Money and Property
Investment Interest
Lease/Rental Income
Other
Intergovernmental Revenues
Property Tax In Lieu Of VLF
Vehicle License Fees
Grants
Reimbursements
Capital Improvement Program
Pechanga IGA
Other Reimbursements
Operating Transfers In
Operating Transfers In
Contribution From Measure S
Miscellaneous
Miscellaneous
Total Revenues and Other Sources
Expenditures by Category
Salaries & Benefits
Operations & Maintenance
Internal Service Fund Allocations
Capital Outlay
Transfers
10,452,986
10,735,507
3,536,689
10,735,507
0 0.0 %
48,776,216
50,281,000
11,486,348
48,781,000
(1,500,000)
-3.0 %
(1,348,016)
(1,347,492)
(355,372)
(1,407,549)
(60,057)
4.5 %
4,299,244
4,396,972
1,326,724
4,396,972
0 0.0 %
4,679,141
4,442,549
1,947,042
5,142,549
700,000
15.8 %
1,908,127
1,916,505
18,249
1,916,505
0 0.0 %
2,240
2,550
124
2,550
0 0.0 %
284,420
275,400
132,995
275,400
0 0.0 %
2,869,845
1,933,940
953,260
1,329,320
(604,620)
-31.3 %
0 1,399
15,316
15,316
13,917
994.8 %
3,453,890
3,080,400
1,565,877
3,005,275
(75,125)
-2.4 %
568,138
645,710
323,349
649,859
4,149
0.6 %
213,631
164,807
48,432
73,324
(91,483)
-55.5 %
1,810,575
1,410,864
547,453
1,141,260
(269,604)
-19.1 %
165,487
173,369
53,840
140,090
(33,279)
-19.2 %
580,203
530,451
219,402
403,390
(127,061)
-24.0 %
749,599
0 42,994
85,958
85,958
100.0 %
216,246
222,255
131,186
222,255
0 0.0 %
103,108
45,900
24,167
232,169
186,269
405.8 %
9,897,474
10,440,844
0 10,549,227
108,383
1.0 %
112,676
122,400
0 122,400
0 0.0 %
13,045
0 17,133
42,000
42,000
100.0 %
3,046,862
3,248,971
0 3,248,971
0 0.0 %
374,107
381,990
0 401,057
19,067
5.0 %
1,161,683
1,048,187
233,459
1,022,234
(25,953)
-2.5 %
15,331,107
10,417,675
0 10,255,187
(162,488)
-1.6 %
5,543,353
9,730,205
0 5,230,205
(4,500,000)
-46.2 %
34,960
9,690
949,136
15,802
6,112
63.1 %
115,300,348 114,312,048 23,217,801 108,028,233 (6,283,815) -5.5 % 21,079,681
22,364,089
10,538,468
21,975,012
(389,077)
-1.7 %
59,751,752
65,317,467
19,852,805
65,358,045
40,578
0.1 %
6,775,621
8,824,408
4,902,016
8,614,715
(209,693)
-2.4 %
463,576
488,410
285,022
478,410
(10,000)
-2.0 %
36,953,675
25,338,979
0 22,001,505
(3,337,474)
-13.2 %
Alk
The Heart of Southern California
Wine Country
FUND: 001 - GENERAL FUND
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
Change
2023-24 Year to Date 2023-24 Q2 from
2022-23 Current Actuals Revised Requested Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget Total Expenditures and Other Financing
Uses 125,024,306 122,333,354 35,578,312 118,427,688 (3,905,666) Excess of Revenues Over (Under) Expenditures (9,723,958) (8,021,306) (12,360,511) (10,399,455) (2,378,149) -3.2
29.6 Fund Balance, Beginning of Year 56,026,337 46,302,379 46,302,379 Fund Balance, End of Year 46,302,379 38,281,073 35,902,924 Fund Description
The General Fund is the main operating fund for the City of Temecula. It is used to account for all financial resources for the City that are not restricted to a special purpose and otherwise required to be accounted for in another fund. The General fund provides the resources necessary to sustain the day-to-day activities and pays for all administrative and operating expenditures.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 002 - MEASURE S FUND
% Change
2023-24 Year to Date
2023-24 Q2
from
2022-23 Current Actuals
Revised
Requested
Current
Description Actuals Budget 12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Taxes and Franchises
Transactions And Use Tax 38,311,796 39,971,000 9,383,974 39,418,000
(553,000)
-1.4 %
Use of Money and Property
Investment Interest 781,117 71,788 176,005
423,800
352,012
490.3 %
Total Revenues and Other Sources 39,092,913 40,042,788 9,559,979 39,841,800
(200,988)
-0.5 %
Expenditures by Category
Transfers 27,776,347 74,890,577 0
69,267,468
(5,623,109)
-7.5
Total Expenditures and Other Financing
Uses 27,776,347 74,890,577 0
69,267,468
(5,623,109)
-7.5 %
Excess of Revenues Over (Under) Expenditures 11,316,566 (34,847,789) 9,559,979 (29,425,668)
5,422,121
-15.6 %
Fund Balance, Beginning of Year 34,675,773 45,992,339
45,992,339
Fund Balance, End of Year 45,992,339 11,144,550
16,566,671
Fund Description
Measure 5, approved by the voters on November 8, 2016, established a one -cent Transactions and Use Tax for the City.
The
measure was approved based on the commitment to maintain 9-1-1 emergency response times, prevent cuts to local
paramedic/police/fire protection, school safety patrols, youth/after-school, senior and disabled services; improve freeway interchanges/reduce traffic and provide for other general services.
EXHIBIT B
Special Revenue Funds and
Debt Service Funds
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 006 - FIRE FACILITY ACQUISITION FUND
Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Use of Money and Property
Investment Interest
29,523
0 11,559
23,119
23,119
100.0
Operating Transfers In
Operating Transfers In
1,500,000
1,500,000
0 1,500,000
0 0.0
Total Revenues and Other Sources
1,529,523
1,500,000
11,559
1,523,119
23,119
1.5 Excess of Revenues Over (Under) Expenditures
1,529,523
1,500,000
11,559
1,523,119
23,119
1.5 Fund Balance, Beginning of Year
1,500,000
3,029,523
3,029,523
Fund Balance, End of Year
3,029,523
4,529,523
4,552,642
Fund Description
This fund was established to accumulate resources necessary to acquire property for a future Fire Station, construct new Fire Station or refurbish existing Fire Stations.
Alk
The Heart of Southern California
Wine Country
FUND: 100 -GAS TAX FUND
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
% Change
2023-24 Year to Date 2023-24 Q2 from
2022-23 Current Actuals Revised Requested Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget Revenues by Source
Taxes and Franchises
Gas Tax
2,792,342
3,137,675
1,091,534 2,969,567 (168,108) -5.4 %
Use of Money and Property
Investment Interest
33,264
0 2,791 5,583 5,583 100.0 %
Total Revenues and Other Sources
2,825,606
3,137,675
1,094,325 2,975,150 (162,525) -5.2 %
Expenditures by Category
Transfers
2,825,606
3,137,675
0 2,975,150 (162,525) -5.2
Total Expenditures and Other Financing
Uses
2,825,606
3,137,675
0 2,975,150 (162,525) -5.2 %
Excess of Revenues Over (Under) Expenditures
0 0
1,094,325 0 0 0.0 %
Fund Balance, Beginning of Year
0 0
0 Fund Balance, End of Year
0 0
0 Fund Description
This fund was established to account for the tax per gallon on the purchase of motor vehicle fuel imposed by the State of California.
A portion is allocated to the City of Temecula as specified in the California Streets and Highways Code (SHC) (Sections 2013, 2105, 2107 and 2107.5). Gas Tax monies are restricted
to the repair, maintenance and
upkeep of City streets and roads, and the purchase
of equipment used to maintain roads.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 102 - ROAD MAINTENANCE REHABILITATION ACCOUNT (RMRA) FUND Change
2023-24 Year to Date 2023-24 Q2 from
2022-23 Current Actuals Revised Requested Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget Revenues by Source
Taxes and Franchises
Gas Tax
2,428,080
2,717,382
923,715
2,629,273
(88,109)
-3.2
Use of Money and Property
Investment Interest
54,376
0 4,864
9,728
9,728
100.0
Total Revenues and Other Sources
2,482,456
2,717,382
928,579
2,639,001
(78,381)
-2.9
Expenditures by Category
Transfers
3,005,103
3,408,732
0 3,408,732
0 0.0
Total Expenditures and Other Financing
Uses
3,005,103
3,408,732
0 3,408,732
0 0.0
Excess of Revenues Over (Under) Expenditures
(522,647)
(691,350)
928,579
(769,731)
(78,381)
11.3 Fund Balance, Beginning of Year
1,561,337
1,038,689
1,038,689
Fund Balance, End of Year
1,038,689
347,339
268,958
Fund Description
This fund is to account for gasoline and vehicle registration taxes pursuant to the Road Repair and Accountability Act of 2017 (S61 Beall). Monies are collected by the State of California and allocated to local agencies for streets and roads projects and other transportation uses.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 103 - STREET MAINTENANCE FUND
% Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Use of Money and Property
Investment Interest
117,536
0 14,990
29,981
29,981
100.0 %
Operating Transfers In
Contribution From Measure S
2,000,000
2,000,000
0 2,000,000
0 0.0
Total Revenues and Other Sources
2,117,536
2,000,000
14,990
2,029,981
29,981
1.5 %
Expenditures by Category
Transfers
3,600,000
0 0
0 0
0.0 Total Expenditures and Other Financing
Uses
3,600,000
0 0
0 0
0.0 %
Excess of Revenues Over (Under) Expenditures
(1,482,464)
2,000,000
14,990
2,029,981
29,981
1.5 %
Fund Balance, Beginning of Year
5,424,001
3,941,537
3,941,537
Fund Balance, End of Year
3,941,537
5,941,537
5,971,518
Fund Description
This fund was established to accumulate resources for the future replacement of streets and roads throughout the City
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 105 - NPDES IN LIEU FEES FUND
% Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Development Fees
599,063
883,456
0 0
(883,456)
-100.0
Use of Money and Property
Investment Interest
2,012
0 2,302
4,605
4,605
100.0 %
Total Revenues and Other Sources
601,076
883,456
2,302
4,605
(878,851)
-99.5 %
Expenditures by Category
Capital Outlay
0 500,000
0 500,000
0 0.0
Total Expenditures and Other Financing
Uses
0 500,000
0 500,000
0 0.0 %
Excess of Revenues Over (Under) Expenditures
601,076
383,456
2,302
(495,395)
(878,851)
-229.2 %
Fund Balance, Beginning of Year
1,940
603,016
603,016
Fund Balance, End of Year
603,016
986,472
107,621
Fund Description
This fund was established to account for the collection of In Lieu fees associated with the National Pollutant Discharge Elimination System (NPDES).
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 106 - UPTOWN TEMECULA NEW STREETS IN -LIEU FEES
% Change
2023-24 Year to Date
2023-24 Q2
from
2022-23 Current Actuals
Revised Requested
Current
Description
Actuals Budget 12-31-2023
Budget Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Development Impact Fees
0 417,315 424,218
664,482 247,167
59.2 Use of Money and Property
Investment Interest
16,999 0 4,240
8,481 8,481
100.0 %
Total Revenues and Other Sources
16,999 417,315 428,458
672,963 255,648
61.3 %
Expenditures by Category
Transfers
0 500,857 0
500,857 0
0.0 Total Expenditures and Other Financing
Uses
0 500,857 0
500,857 0
0.0 %
Excess of Revenues Over (Under) Expenditures
16,999 (83,542) 428,458
172,106 255,648
-306.0 %
Fund Balance, Beginning of Year
888,761 905,760
905,760
Fund Balance, End of Year
905,760 822,218
1,077,866
Fund Description
This fund was established in conjunction with the adoption of the Uptown Temecula Specific Plan New Streets In -Lieu Fee.
The
Specific Plan requires developers to dedicate right-of-way and construct new street improvements adjacent to or through their
development sites. Developers within the Specific Plan who cannot contribute right-of-way and/or build new streets will
be charge(
a new streets in -lieu fee.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 108 - ARPA
Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Intergovernmental Revenues
Grants
7,039,754
0 0
0 0
0.0 Total Revenues and Other Sources
7,039,754
0 0
0 0
0.0 Expenditures by Category
Transfers
7,039,754
0 0
0 0
0.0 Total Expenditures and Other Financing
Uses
7,039,754
0 0
0 0
0.0 Excess of Revenues Over (Under) Expenditures
0 0
0 0
0 0.0
Fund Balance, Beginning of Year
0 0
0 Fund Balance, End of Year
0 0
0 Fund Description
This fund was established to account for the receipt of Federal 2021-22 American Rescue Plan Act (ARPA) funds
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 110 - COVID-19 PANDEMIC COMMUNITY REINVESTMENT PROGRAM % Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Use of Money and Property
Investment Interest
0 0
42,124
84,249
84,249
100.0 %
Operating Transfers In
Operating Transfers In
7,040,000
0 0
37,706
37,706
100.0 %
Total Revenues and Other Sources
7,040,000
0 42,124
121,955
121,955
100.0 %
Expenditures by Category
Salaries & Benefits
30,205
15,239
2,394
15,239
0 0.0
Operations & Maintenance
2,398,739
3,788,601
1,637,952
3,317,824
(470,777)
-12.4 %
Capital Outlay
0 0
0 0
0 0.0 %
Transfers
500,000
5,925,000
0 6,425,000
500,000
8.4 %
Total Expenditures and Other Financing
Uses
2,928,944
9,728,840
1,640,346
9,758,063
29,223
0.3 %
Excess of Revenues Over (Under) Expenditures
4,111,056
(9,728,840)
(1,598,222)
(9,636,108)
92,732
-1.0 %
Fund Balance, Beginning of Year
7,034,894
11,145,950
11,145,950
Fund Balance, End of Year
11,145,950
1,417,111
1,509,843
Fund Description
This fund was established in Fiscal Year 2021-22 to provide various community grants to support the local economy in its recovery from the COVID-19 global pandemic. Available General Fund balance was transferred into this fund to establish this new program
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 120 - DEVELOPMENT IMPACT FEES FUND
% Change
2023-24 Year to Date 2023-24 Q2 from
2022-23 Current Actuals Revised Requested Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget Revenues by Source
Licenses, Permits and Service Charges
Development Impact Fees
8,057,121
7,526,621
2,558,560
6,283,683
(1,242,938)
-16.5 %
Quimby Fees
2,238,980
266,269
8,541
466,269
200,000
75.1 %
Use of Money and Property
Investment Interest
223,188
0 46,917
93,834
93,834
100.0 %
Total Revenues and Other Sources
10,519,288
7,792,890
2,614,017
6,843,786
(949,104)
-12.2 %
Expenditures by Category
Transfers
6,814,690
10,089,886
0 10,174,809
84,923
0.8 %
Total Expenditures and Other Financing
Uses
6,814,690
10,089,886
0 10,174,809
84,923
0.8 %
Excess of Revenues Over (Under) Expenditures
3,704,598
(2,296,996)
2,614,017
(3,331,023)
(1,034,027)
45.0 %
Fund Balance, Beginning of Year
7,654,742
11,359,340
11,359,340
Fund Balance, End of Year
11,359,340
9,062,343
8,028,316
Fund Description
This fund accounts for the development impact fees received as a result of development activity within the City. The fees are primarily used to fund Capital Improvement Projects designed to mitigate the impacts of development projects.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 125 - PUBLIC EDUCATION & GOVERNMENT (PEG) FUND
Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Taxes and Franchises
Peg Fees
175,292
179,000
39,041
179,000
0 0.0
Use of Money and Property
Investment Interest
15,254
0 3,310
6,620
6,620
100.0
Total Revenues and Other Sources
190,546
179,000
42,351
185,620
6,620
3.7 Expenditures by Category
Capital Outlay
21,895
165,000
2,688
165,000
0 0.0
Total Expenditures and Other Financing
Uses
21,895
165,000
2,688
165,000
0 0.0
Excess of Revenues Over (Under) Expenditures
168,652
14,000
39,663
20,620
6,620
47.3 Fund Balance, Beginning of Year
710,672
879,324
879,324
Fund Balance, End of Year
879,324
893,324
899,944
Fund Description
This fund was established to account for Public Education and Government (PEG) fees. Fees received from local cable operators for the sole purpose of supporting the access facilities and activities within the City.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 140 - COMMUNITY DEV BLOCK GRANT FUND
% Change
2023-24 Year to Date
2023-24 Q2
from
2022-23
Current Actuals
Revised
Requested
Current
Description
Actuals
Budget 12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Intergovernmental Revenues
Community Development Block Grant
376,702
621,857 969,486
1,563,269
941,412
151.4 %
CDBG - CV2 GRANTS
1S,184
0 0
662,675
662,67S
100.0 %
Total Revenues and Other Sources
391,885
621,857 969,486
2,225,944
1,604,087
258.0 %
Expenditures by Category
Salaries & Benefits
38,179
42,724 18,241
42,724
0 0.0
Operations & Maintenance
251,691
168,480 160,493
168,480
0 0.0
Transfers
163,722
2,061,583 0
2,061,583
0 0.0 %
Total Expenditures and Other Financing
Uses
453,593
2,272,786 178,734
2,272,786
0 0.0 %
Excess of Revenues Over (Under) Expenditures
(61,707)
(1,650,929) 790,752
(46,842)
1,604,087
-97.2
Fund Balance, Beginning of Year
108,549
46,842
46,842
Fund Balance, End of Year
46,842
(1,604,087)
0 Fund Description
This fund was established to account for grants received from the U.S. Department of Housing
and Urban Development (HUD). The
grants are used for the redevelopment of a viable
community by providing decent housing,
a suitable living
environment, and for
expanding opportunities, principally for persons
of low and moderate income.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 145 - TEMECULA ENERGY EFFICIENCY ASSET (TEAM) FUND Change
2023-24 Year to Date
2023-24 Q2
from
2022-23
Current Actuals
Revised Requested
Current
Description
Actuals
Budget 12-31-2023
Budget Adjustments
Budget
Revenues by Source
Use of Money and Property
Investment Interest
16,572
0 2,795
5,592 5,592
100.0
Total Revenues and Other Sources
16,572
0 2,795
5,592 5,592
100.0
Expenditures by Category
Transfers
115,807
683,122 0
683,122 0
0.0 Total Expenditures and Other Financing
Uses
115,807
683,122 0
683,122 0
0.0 Excess of Revenues Over (Under) Expenditures
(99,235)
(683,122) 2,795
(677,530) 5,592
-0.8
Fund Balance, Beginning of Year
833,528
734,293
734,293
Fund Balance, End of Year
734,293
51,171
56,763
Fund Description
This fund was established to capture energy efficiency rebates and reimbursements as well
as expenditure savings resulting
from
energy efficiency projects completed at various City facilities. Revenue collected in this fund will be utilized on future energy efficiency projects.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 150 - AB 2766 MOTOR VEHICLE SUBVENTION FUND
% Change
2023-24 Year to Date 2023-24 Q2 from
2022-23 Current Actuals Revised Requested Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget Revenues by Source
Use of Money and Property
Investment Interest
6,371
0 1,428 2,857
2,857 100.0 %
Intergovernmental Revenues
AB2766 Motor Vehicle Subvention
182,197
142,977
0 142,977
0 0.0
Operating Transfers In
Operating Transfers In
0 0
0 10,000
10,000 100.0
Total Revenues and Other Sources
188,568
142,977
1,428 155,834
12,857 9.0 %
Expenditures by Category
Operations & Maintenance
10,000
10,000
0 10,000
0 0.0 %
Transfers
38,044
534,419
2,760 534,419
0 0.0 %
Total Expenditures and Other Financing
Uses
48,044
544,419
2,760 544,419
0 0.0 %
Excess of Revenues Over (Under) Expenditures
140,524
(401,442)
(1,332) (388,585)
12,857 -3.2 %
Fund Balance, Beginning of Year
250,531
391,055
391,055
Fund Balance, End of Year
391,055
(10,387)
2,470
Fund Description
This fund was established to account for subvention funds that are used to implement
programs and projects that reduce air
pollution from motor vehicles. AB2766 Funds are derived from a Motor Vehicle Registration fee surcharge.
Local governments are
allocated $1.60 for every eligible vehicle registered
within the South Coast Air Quality Management District. Funds are disbursed based on the City's population as a percentage of the total population within the District. This fund is used for Capital projects and
the City's share of WRCOG's Clean Cities Coalition.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 160 - SUPPLEMENTAL LAW ENFORCEMENT SERVICES FUND
% Change
2023-24 Year to Date 2023-24 Q2
from
2022-23 Current Actuals Revised Requested
Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget
Revenues by Source
Use of Money and Property
Investment Interest 2,722 0 18 37 37
100.0 %
Intergovernmental Revenues
SLESF Grant 282,541 280,000 25,000 280,000 0
0.0 Total Revenues and Other Sources 285,263 280,000 25,018 280,037 37
0.0 %
Expenditures by Category
Transfers 285,263 280,000 0 280,037 37
0.0 Total Expenditures and Other Financing
Uses 285,263 280,000 0 280,037 37
0.0 %
Excess of Revenues Over (Under) Expenditures 0 0 25,018 0 0
0.0 %
Fund Balance, Beginning of Year 0 0 0
Fund Balance, End of Year 0 0 0
Fund Description
This fund was established to account for the Supplemental Law Enforcement Services grant monies from the State of California which are provided to assist cities in delivering front line law enforcement services. These monies supplement existing services and
may not be used to supplant any existing funding for law enforcement services provided by the City.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 165 - AFFORDABLE HOUSING FUND
% Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Taxes and Franchises
Redevelopment Property Tax Fund
2,450,971
900,000
0 900,000
0 0.0
Distribution
Use of Money and Property
Investment Interest
105,750
0 24,149
48,298
48,298
100.0
Lease/Rental Income
12,600
0 37,800
44,100
44,100
100.0 %
Other
6,153
0 12,674
12,674
12,674
100.0 %
Intergovernmental Revenues
Agency Trust Contribution
250,000
250,000
0 250,000
0 0.0
Reimbursements
Other Reimbursements
13,898
0 0
0 0
0.0 Operating Transfers In
Operating Transfers In
0 750,000
0 750,000
0 0.0 %
Miscellaneous
Miscellaneous
0 0
114,268
114,269
114,269
100.0 %
Total Revenues and Other Sources
2,839,371
1,900,000
188,891
2,119,341
219,341
11.5 %
Expenditures by Category
Salaries & Benefits
223,488
363,126
171,915
363,126
0 0.0
Operations & Maintenance
88,359
288,423
25,928
267,823
(20,600)
-7.1 %
Internal Service Fund Allocations
36,787
59,330
39,522
55,592
(3,738)
-6.3 %
Transfers
2,450,971
5,841,359
0 5,841,359
0 0.0 %
Total Expenditures and Other Financing
Uses
2,799,604
6,552,238
237,365
6,527,900
(24,338)
-0.4 %
Excess of Revenues Over (Under) Expenditures
39,767
(4,652,238)
(48,474)
(4,408,559)
243,679
-5.2 %
Fund Balance, Beginning of Year
11,964,611
12,004,378
12,004,378
Fund Balance, End of Year
12,004,378
7,352,140
7,595,819
Fund Description
The Affordable Housing fund contains the assets as well as loan and rental income which have been transferred to the City of Temecula from the former Redevelopment Agency.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 170 - MEASURE A FUND
% Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Use of Money and Property
Investment Interest
166,036
0 27,934
55,868
55,868
100.0 %
Intergovernmental Revenues
Measure A
4,503,516
4,354,000
1,427,809
4,354,000
0 0.0
Total Revenues and Other Sources
4,669,S52
4,354,000
1,455,743
4,409,868
55,868
1.3 %
Expenditures by Category
Operations & Maintenance
2,729,188
2,941,169
2,468,454
2,941,169
0 0.0
Transfers
3,907,518
5,218,512
1,000
5,818,512
600,000
11.5 Total Expenditures and Other Financing
Uses
6,636,706
8,159,681
2,469,454
8,759,681
600,000
7.4 %
Excess of Revenues Over (Under) Expenditures
(1,967,154)
(3,805,681)
(1,013,711)
(4,349,813)
(544,132)
14.3 %
Fund Balance, Beginning of Year
9,063,242
7,096,089
7,096,089
Fund Balance, End of Year
7,096,089
3,290,407
2,746,275
Fund Description
This fund was established to account for the City's allocation of the County of Riverside's additional one-half percent sales tax for transportation. These monies are restricted for use on local streets. In 2002, Measure A was extended by Riverside County voters.
Measure A will continue to fund transportation improvements through 2039.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 198 - PUBLIC ART FUND
% Change
2023-24 Year to Date
2023-24 Q2 from
2022-23 Current Actuals
Revised Requested Current
Description Actuals Budget 12-31-2023
Budget Adjustments Budget
Revenues by Source
Licenses, Permits and Service Charges
Public Art 95,599 10,400 27,428
6,100 (4,300) -41.3 %
Use of Money and Property
Investment Interest 3,463 0 921
1,843 1,843 100.0 %
Total Revenues and Other Sources 99,062 10,400 28,349
7,943 (2,457) -23.6 %
Expenditures by Category
Operations & Maintenance 4,630 25,370 0
80,370 55,000 216.8 %
Total Expenditures and Other Financing
Uses 4,630 25,370 0
80,370 55,000 216.8 %
Excess of Revenues Over (Under) Expenditures 94,432 (14,970) 28,349 (72,427) (57,457) 383.8 %
Fund Balance, Beginning of Year 131,995 226,427
226,427
Fund Balance, End of Year 226,427 211,457
154,000
Fund Description
This fund was established pursuant to Temecula Municipal Code Section 5.08.040, whereby the fund serves a a depository for the
fees paid in lieu of art as well as monetary donations for public art. The Public Art In Lieu fee is one -tenth of one percent of an eligible development project in excess of $100,000. Eligible uses of this fund include the design, acquisition, installation,
improvement, maintenance and insurance of public artwork; offering of performing arts programs on City property for the community; and art education programs on City property for the community.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 210 - CAPITAL IMPROVEMENT PROGRAM FUND
% Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Development Impact Fees
4,319,145
6,279,323
0 6,364,246
84,923
1.4 %
Quimby Fees
2,320,029
3,810,563
0 3,810,563
0 0.0 %
Use of Money and Property
Investment Interest
0 0
38,894
0 0
0.0 %
Intergovernmental Revenues
Grants
310,000
3,811,656
0 3,811,656
0 0.0
Reimbursements
Capital Improvement Program
14,356,352
153,135,216
18,744,928
153,164,796
29,580
0.0 Pechanga IGA
1,700,000
1,400,000
0 1,400,000
0 0.0
Other Reimbursements
1,725,490
0 0
0 0
0.0 Operating Transfers In
Operating Transfers In
4,237,944
35,454,306
3,760
36,554,306
1,100,000
3.1 %
Contribution From Measure S
7,001,860
45,144,776
0 45,144,776
0 0.0 %
Total Revenues and Other Sources
35,970,820
249,035,839
18,787,583
250,250,342
1,214,503
0.5 %
Expenditures by Category
CIP
40,651,364
253,852,271
0 255,066,774
1,214,503
0.5 Total Expenditures and Other Financing
Uses
40,651,364
253,852,271
0 255,066,774
1,214,503
0.5 %
Excess of Revenues Over (Under) Expenditures
(4,680,544)
(4,816,432)
18,787,583
(4,816,432)
0 0.0
Fund Balance, Beginning of Year
11,383,259
6,702,714
6,702,714
Fund Balance, End of Year
6,702,714
1,886,283
1,886,283
Fund Description
This fund was established to account for the City's Capital Improvement Program revenues and expenditures.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 395 - 2018 FINANCING LEASE (CIVIC CENTER) FUND
% Change
2023-24 Year to Date 2023-24 Q2
from
2022-23 Current Actuals Revised Requested
Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget
Revenues by Source
Operating Transfers In
Operating Transfers In 13,425,327 0 0 0 0
0.0 Total Revenues and Other Sources 13,425,327 0 0 0 0
0.0 %
Expenditures by Category
Operations & Maintenance 13,425,327 0 0 0 0
0.0 Total Expenditures and Other Financing
Uses 13,425,327 0 0 0 0
0.0 %
Excess of Revenues Over (Under) Expenditures 0 0 0 0 0
0.0 Fund Balance, Beginning of Year 0 0 0
Fund Balance, End of Year 0 0 0
Fund Description
This fund was established to account for the payment of interest and principal of the refunding of the 2001 and 2008 Certificates of Participation (COPs). The 2001 COPS were originally issued to finance the construction of the Community Recreation Center and the
2008 COPS were originally issued to finance the construction of the Civic Center. In Fiscal Year 2018-19, the terms of the lease were
refinanced, lowering the interest rate from 3.75% to 3.42%. The term of the lease expires September 1, 2033.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 396 - 2018 FINANCING LEASE (MRC) FUND
Change
2023-24 Year to Date 2023-24 Q2
from
2022-23 Current Actuals Revised
Requested
Current
Description Actuals Budget 12-31-2023 Budget
Adjustments
Budget
Revenues by Source
Operating Transfers In
Operating Transfers In 5,316,429 0 0 0
0 0.0
Total Revenues and Other Sources 5,316,429 0 0 0
0 0.0
Expenditures by Category
Operations & Maintenance 5,316,429 0 0 0
0 0.0
Total Expenditures and Other Financing
Uses 5,316,429 0 0 0
0 0.0
Excess of Revenues Over (Under) Expenditures 0 0 0 0
0 0.0
Fund Balance, Beginning of Year 0 0 0
Fund Balance, End of Year 0 0 0
Fund Description
This fund was established to account for the payments of interest and principal related to the financing of the rehabilitation of the Margarita Recreation Center (MRC). The Lease Agreement, dated August 1, 2018, generated $6.5 million in proceeds at an interest
rate of 3.42%. The Term of the lease expires September 1, 2033,
EXHIBIT C
Internal Service Funds
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 300 - INSURANCE FUND
% Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Charges For Services 1,944,246
2,328,809
2,513,948
2,328,809
0 0.0 %
Use of Money and Property
Investment Interest 28,392
0 1,636
3,273
3,273
100.0 %
Total Revenues and Other Sources 1,972,638
2,328,809
2,515,584
2,332,082
3,273
0.1 %
Expenditures by Category
Salaries & Benefits 176,376
205,073
101,121
205,073
0 0.0 %
Operations & Maintenance 1,850,294
2,123,736
2,436,774
2,723,736
600,000
28.3 %
Total Expenditures and Other Financing
Uses 2,026,669
2,328,809
2,537,895
2,928,809
600,000
25.8 %
213,116,785
Excess of Revenues Over (Under) Expenditures (54,031)
0 (22,311)
(596,727)
(596,727)
.7 %
Fund Balance, Beginning of Year 810,122
756,091
756,091
Fund Balance, End of Year 756,091
756,091
159,364
Fund Description
The Insurance Fund was established to account for the City's liability and property insurance costs. Fund Balance is a combination of both spendable and non spendable assets. These costs are allocated to each department based on the total number
of Full Time
Equivalent positions assigned to those departments. The City has a Self -Insured Retention
(SIR) of $150,000
per incident, and
strives to maintain a fund balance equal to three times the SIR.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 305 - WORKERS' COMPENSATION FUND
% Change
2023-24 Year to Date
2023-24 Q2
from
2022-23 Current Actuals
Revised
Requested
Current
Description
Actuals Budget 12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Charges For Services
370,908 0 0
0 0
0.0 Use of Money and Property
Investment Interest
27,413 0 5,302
10,605
10,605
100.0 %
Reimbursements
Other Reimbursements
2,137 0 0
0 0
0.0 %
Total Revenues and Other Sources
400,458 0 5,302
10,605
10,605
100.0 %
Expenditures by Category
Salaries & Benefits
176,375 205,583 101,120
205,583
0 0.0 %
Operations & Maintenance
401,729 344,782 248,566
344,782
0 0.0 %
Total Expenditures and Other Financing
Uses
578,104 550,365 349,686
550,365
0 0.0 %
Excess of Revenues Over (Under) Expenditures
(177,646) (550,365) (344,384)
(539,760)
10,605
-1.9 %
Fund Balance, Beginning of Year
1,677,621 1,499,975
1,499,975
Fund Balance, End of Year
1,499,975 949,610
960,215
Fund Description
The Workers' Compensation Fund was established in Fiscal Year 2014-15 as the City transitions to a self -insured status for Workers'
Compensation liabilities. Departments are charged based on each position allocated on a Full Time Equivalent
basis, with
a cost
assigned to each position based on job duties and
potential for risk. The desired Net Position
for this fund is $1.5 million,
which
represents three -times the City's Self -Insured Retention amount of $500,000.
Alk
The Heart of Southern California
Wine Country
FUND: 310 - VEHICLES AND EQUIPMENT FUND
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
% Change
2023-24 Year to Date 2023-24 Q2 from
2022-23 Current Actuals Revised Requested Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget Revenues by Source
Licenses, Permits and Service Charges
Charges For Services
348,495
467,241
213,016
467,241
0 0.0
Use of Money and Property
Investment Interest
62,796
0 12,918
25,838
25,838 100.0 %
Operating Transfers In
Contribution From Measure S
500,000
0 0
0 0 0.0 %
Total Revenues and Other Sources
911,291
467,241
225,934
493,079
25,838 5.5 %
Expenditures by Category
Operations & Maintenance
380,695
0 0
0 0 0.0 %
Capital Outlay
600
871,879
544,620
871,879
0 0.0 %
Total Expenditures and Other Financing
Uses
381,295
871,879
544,620
871,879
0 0.0 %
Excess of Revenues Over (Under) Expenditures
529,997
(404,638)
(318,686)
(378,800)
25,838 -6.4 %
Fund Balance, Beginning of Year
4,719,293
5,249,290
5,249,290
Fund Balance, End of Year
5,249,290
4,844,652
4,870,490
Fund Description
The Vehicles and Equipment Fund was established to account for the depreciation of vehicles and capital equipment over their estimated useful lives, and to accumulate resources for the purchase of future replacement vehicles and equipment.
Fund Balance
is a combination of both spendable and non spendable assets.
Departments are
charged based
on the replacement costs for each
asset benefitting the department.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 320 - INFORMATION TECHNOLOGY FUND
% Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Charges For Services
4,812,964
6,137,244
2,815,108
6,137,244
0 0.0 %
Use of Money and Property
Investment Interest
31,691
0 3,974
7,950
7,950
100.0 %
Operating Transfers In
Contribution From Measure S
300,000
300,000
0 300,000
0 0.0 %
Total Revenues and Other Sources
5,144,655
6,437,244
2,819,082
6,445,194
7,950
0.1 %
Expenditures by Category
Salaries & Benefits
2,633,369
2,940,212
1,341,113
2,905,041
(35,171)
-1.2 %
Operations & Maintenance
2,141,528
3,464,629
1,734,384
3,464,629
0 0.0 %
Internal Service Fund Allocations
2,660
5,320
1,330
2,660
(2,660)
-50.0 %
Capital Outlay
23,360
125,000
84,024
125,000
0 0.0 %
Total Expenditures and Other Financing
Uses
4,800,917
6,535,162
3,160,851
6,497,331
(37,831)
-0.6 %
Excess of Revenues Over (Under) Expenditures
343,738
(97,918)
(341,768)
(52,137)
45,781
-46.8 %
Fund Balance, Beginning of Year
1,449,014
1,792,752
1,792,752
Fund Balance, End of Year
1,792,752
1,694,834
1,740,615
Fund Description
The Information Technology Fund was established to fund and account for computer and telephone system operating and maintenance expenses. Fund Balance is a combination
of both spendable and
non spendable
assets. Adjustments are made to
Fund Balance to include additional spendable resources available for expenditure. Departments are charged based on the number
of electronic devices assigned. The Ronald H. Roberts Temecula Public Library facility is charged directly for all IT expenditures and personnel costs related to the facility.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 325 - TECHNOLOGY REPLACEMENT FUND
% Change
2023-24 Year to Date
2023-24 Q2
from
2022-23
Current Actuals
Revised
Requested
Current
Description
Actuals
Budget 12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Charges For Services
177,577
228,616 66,592
228,616
0 0.0
Use of Money and Property
Investment Interest
48,810
0 10,675
21,351
21,351
100.0 %
Operating Transfers In
Contribution From Measure S
500,000
500,000 0
0 (500,000)
-100.0 %
Total Revenues and Other Sources
726,387
728,616 77,267
249,967
(478,649)
-65.7 %
Expenditures by Category
Operations & Maintenance
164,887
0 0
0 0
0.0 %
Capital Outlay
6,061
680,000 456,510
680,000
0 0.0 %
Transfers
0 763,534 0
763,534
0 0.0 %
Total Expenditures and Other Financing
Uses
170,949
1,443,534 456,510
1,443,534
0 0.0 %
Excess of Revenues Over (Under) Expenditures
555,438
(714,918) (379,243)
(1,193,567)
(478,649)
67.0 %
Fund Balance, Beginning of Year
2,471,172
3,026,610
3,026,610
Fund Balance, End of Year
3,026,610
2,311,692
1,833,043
Fund Description
The Technology Replacement Fund was established in Fiscal Year 2014-15 in order to accumulate resources
for computer
and
telephone equipment and software to fund future equipment replacement. Fund Balance is a combination of both spendable and
non spendable assets. Contributions to this fund are made by departments utilizing the assets in an amount equivalent to the
estimated cost to replace the item at the end of
its useful life.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 330 - SUPPORT SERVICES FUND
% Change
2023-24 Year to Date
2023-24 Q2
from
2022-23 Current Actuals
Revised
Requested
Current
Description
Actuals Budget 12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Charges For Services
383,989 393,432 153,379
393,432
0 0.0
Use of Money and Property
Investment Interest
552 0 73
147
147
100.0 %
Total Revenues and Other Sources
384,541 393,432 153,452
393,579
147
0.0 %
Expenditures by Category
Salaries & Benefits
269,472 279,388 125,833
279,388
0 0.0
Operations & Maintenance
104,681 114,044 82,212
114,044
0 0.0 %
Total Expenditures and Other Financing
Uses
374,153 393,432 208,046
393,432
0 0.0 %
Excess of Revenues Over (Under) Expenditures
10,389 0 (54,594)
147
147
-49,000.0 %
Fund Balance, Beginning of Year
3,422 13,811
13,811
Fund Balance, End of Year
13,811 13,811
13,958
Fund Description
The Support Services Fund was established as a cost
center for the City's central receptionist,
duplicating, printing, and
mailing
activities. It is also used to depreciate all related
copying and mailing equipment over their
useful lives, and to accumulate
resources for the purchase of future equipment.
Fund Balance is a combination of both spendable and non spendable assets.
Departments are charged based on a count of copies made in the previous fiscal year.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 335 - SUPPORT SERVICES REPLACEMENT FUND
% Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Charges For Services
41,424
25,529
16,551
25,529
0 0.0
Use of Money and Property
Investment Interest
6,718
0 1,284
2,568
2,568
100.0 %
Lease/Rental Income
300
0 0
0 0
0.0 %
Total Revenues and Other Sources
48,441
25,529
17,835
28,097
2,568
10.1 %
Expenditures by Category
Operations & Maintenance
58,943
0 0
0 0
0.0 %
Capital Outlay
0 10,000
6,589
10,000
0 0.0 %
Total Expenditures and Other Financing
Uses
58,943
10,000
6,589
10,000
0 0.0 %
Excess of Revenues Over (Under) Expenditures
(10,502)
15,529
11,246
18,097
2,568
16.5 %
Fund Balance, Beginning of Year
389,403
378,901
378,901
Fund Balance, End of Year
378,901
394,430
396,998
Fund Description
The Support Services Replacement Fund was established
to accumulate resources for the future replacement
of the City's
duplicating equipment.
Alk
The Heart of Southern California
Wine Country
FUND: 340 - FACILITIES FUND
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
Change
2023-24 Year to Date 2023-24 Q2 from
2022-23 Current Actuals Revised Requested Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget Revenues by Source
Licenses, Permits and Service Charges
Charges For Services
1,634,859
1,953,364
812,156
1,953,364
0 0.0
Use of Money and Property
Investment Interest
10,391
0 2,109
4,219
4,219
100.0
Reimbursements
Other Reimbursements
0 0
24,000
24,000
24,000
100.0
Total Revenues and Other Sources
1,645,250
1,953,364
838,265
1,981,583
28,219
1.4 Expenditures by Category
Salaries & Benefits
490,954
589,859
235,663
580,921
(8,938)
-1.5
Operations & Maintenance
1,149,586
1,101,404
6S4,421
1,101,404
0 0.0
Total Expenditures and Other Financing
Uses
1,640,540
1,691,263
890,083
1,682,325
(8,938)
-0.5
Excess of Revenues Over (Under) Expenditures
4,709
262,101
(51,818)
299,258
37,157
14.2 Fund Balance, Beginning of Year
577,617
582,326
582,326
Fund Balance, End of Year
582,326
844,428
881,585
Fund Description
The Facilities Fund was established to account for
the cost of the Civic Center,
Former City
Hall Facility, City
Maintenance Facility,
Field Operations Center, and Civic Center Parking Structure operations and maintenance.
Fund Balance is a combination of both
spendable and non spendable assets. Departments are charged based on square footage allotted as well as full time staff
equivalents assigned.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 350 - FACILITY REPLACEMENT FUND
% Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Charges For Services
73,632
98,663
43,366
98,663
0 0.0
Use of Money and Property
Investment Interest
14,402
0 1,227
2,456
2,456
100.0 %
Operating Transfers In
Contribution From Measure S
660,000
2,050,000
0 2,550,000
500,000
24.4 %
Total Revenues and Other Sources
748,034
2,148,663
44,593
2,651,119
502,456
23.4 %
Expenditures by Category
Operations & Maintenance
89,084
0 0
0 0
0.0 %
Capital Outlay
0 158,125
0 158,125
0 0.0
Transfers
752,924
1,527,128
0 1,527,128
0 0.0
Total Expenditures and Other Financing
Uses
842,008
1,685,253
0 1,685,253
0 0.0 %
Excess of Revenues Over (Under) Expenditures
(93,974)
463,410
44,593
965,866
502,456
108.4 %
Fund Balance, Beginning of Year
746,107
652,133
652,133
Fund Balance, End of Year
652,133
1,115,543
1,617,999
Fund Description
The Facility Replacement Fund was established to accumulate resources for the future replacement of equipment, systems and fixtures within City -owned facilities.
RESOLUTION NO. 2024-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TEMECULA AMENDING THE CAPITAL
IMPROVEMENT PROGRAM FISCAL YEARS 2024-28 AND
AMENDING THE CAPITAL IMPROVEMENT BUDGET
FOR FISCAL YEAR 2023-24
THE CITY COUNCIL OF THE CITY OF TEMECULA DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. Recitals. The City Council hereby finds, determines and declares that:
A. On June 7, 2023, the Planning Commission found the Capital Improvement Program projects are consistent with the General Plan in accordance with Government Code Section 65401 of State Planning and Zoning Law.
B. On June 13, 2023, the City Council adopted Resolution No. 2023-53 approving the City of Temecula Capital Improvement Program Fiscal Years 2024-28 (CIP).
C. Adoption of the Amendments noted herein are categorically exempt from environmental review under the California Environmental Quality Act (CEQA).
Pursuant to Sections 15262 and 15061 (b) (3) of the State Guidelines for Implementation of CEQA, a project involving only feasibility or planning studies for possible future actions because it can be seen with certainty that this prioritizing and fund allocation program set forth in the Amendment cannot and does not have the potential to cause a significant effect on the environment. No physical activity will occur until all required CEQA review is conducted at the time the physical improvements prioritized in the Amendment are undertaken. The Council reaffirms and incorporates herein the findings set forth in Section 1 of Resolution No. 2023-53.
Section 2. Specific Actions: Based on the findings above, the City Council determines and declares the following adjustments to the Fiscal Year "City of Temecula Capital Improvement Program Fiscal Years 2024-28" are hereby adopted:
A. Amend the 2023-24 appropriation for the Nicolas Road Multi Use Trail Extension project, to add an additional $600,000 in Measure A funds.
B. Amend the 2023-24 appropriation for the Bike Lane and Trail Program- Citywide project, to reduce the appropriation and reprogram $450,000 in AB 2766 funds to the Nicolas Road Multi Use Trail Extension project.
C. Amend the 2023-24 appropriation for the Traffic Signal- Safety Lights and Signal Communications Upgrade -Citywide project to advance $84,823 in DIF-Traffic Signal funds and $29,580 in HSIP funding programmed in 2024-25 to 2023-24.
D. Amend the Fiscal Years 2024-28 Capital Improvement Program to add the following new project subject to future Planning Commission determination that the project is consistent with the City's General Plan:
a. Temecula Creek Fencing Project, utilizing $500,000 in Community Reinvestment Program funds originally budgeted as an operating expenditure;
The budget and appropriation for these projects are set forth in Exhibit 1 and are hereby approved.
Section 3. Certification: The City Clerk shall certify the adoption of this resolution.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of Temecula this 27th day of February, 2024.
James Stewart, Mayor
ATTEST:
Randi Johl, City Clerk
[SEAL]
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss
CITY OF TEMECULA )
I, Randi Johl, City Clerk of the City of Temecula, do hereby certify that the foregoing Resolution No. 2024- was duly and regularly adopted by the City Council of the City of Temecula at a meeting thereof held on the 27th day of February, 2024, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
Randi Johl, City Clerk
Capital
Improvement
Program
Adk
s
The Heart of Southern California
Wine Country
NICOLAS ROAD MULTI -USE TRAIL EXTENSION
Infrastructure Project
Project Description: This project includes the design, environmental documents and permits, construction, improvements and extension of the Nicolas Road Multi - Use Trail from the Seraphina easterly boundary to Joseph Road. The improvements include approximately 1,800 LF of 10' wide Class I Bikeway.
Benefit: This project improves pedestrian and biking circulation on the northern side of the City
Core Value: Transportation Mobility and Connectivity
Project Status: The trail will be constructed by the developer when they construct the Nicolas Road Extension.
Department: Public Works - Account No. 210.265.999.5800.PWNT-25 / 785 City of Temecula
Fiscal Years 2024-28
Capital Improvement Program
Project Cost: Cost: PrActualsrs�AdJ Adjusted Budget Requests R quests Budget Projected Projected Projected Projected Project Costst d Budgetd R quests Budget P ojected P ojected P ojected P ojected Project Cost 5804-Construction 450,000 1,050,000 1,500,000 1.500.000 Cnur�a of Fonda•
4051-DIF-Open Space & Trails
300,000
300,000
4002-Measure S
150,000 150,000
150,000
4170- Measure A
600,000 600,000
600,000
4427- Assembly Bill 2766
450,000 450,000
450,000
Total Fun in
300 000
150,000 1,050,000 1,200,000
1 0 0
Future Operating & Maintenance Costs:
Total Operating Costs
Adk
s
The Heart of Southern California
Wine Country
BIKE LANE AND TRAIL PROGRAM - CITYWIDE
Infrastructure Project
City of Temecula
Fiscal Years 2024-28
Capital Improvement Program
Project Description: The Multi -Use Trails and Bikeways Master Plan was completed in Fiscal Year 2015-16. The Plan includes new trail and bikeway information sheets detailing constraints, solutions, surface types, widths, and estimated construction costs. The City is a Bronze Level Bicycle Friendly Community and this project allows for continued implementation of facilities and programs, which further the City's _
commitment to proving a safe and convenient network that connects schools, parks, open space, shopping, and employment centers.
Benefit: This project provides alternative modes of transportation and increases connectivity and accessibility to Old Town, Wine Country, and the City's many schools, 4 . � •r 7
parks, trails, and open space areas.
i
Core Value: A Sustainable and Resilient City
Project Status: Improvements will be made on an ongoing basis as funding becomes available.
Department: Community Development - Account No. 210.265.999.5800.CD18-01 / 703 Level: I
2023-24 2023-24 Mid- 2023-24
Prior Years
2022-23 Adopted Year Revised 2024-25 2025-26 2026-27 2027-28 Total Project
Project Cost:
Actuals
Adjusted Budget Requests Budget Projected Projected Projected Projected Cost
5801-Administration
6,712
89,740 (5,321) 84,419
91,131
5804-Construction
122,263
226,759 (226,759) 143,830 1,296,222 162,554 174,225
1,899,094
5802-Design & Environmental
168,761
50,762 217,921 (217,921)
219,523
Cno . of C.... 4.-
4427-Assembly Bill 2766
218,419
38,044 534,420 (450,000) 84,420 143,830 151,664 162,554 174,225 973,156
4478-Beyond Grant
19,857
19,857
4051-DIF-Open Space & Trails
72,177
72,177
4452-Unspecified
1,144,558
1,144,558
Total Fundin
310 453
38,044 534,420 (450,000)2 143,830 1,296,222 162,554 174,225 2 009 748
Future Operating & Maintenance Costs:
Total Operating Costs
..
City of Temecula
Fiscal Years 2024-28
Capital Improvement Program
The Heart of Southern California
Wine Country
TRAFFIC SIGNAL - SAFETY LIGHTS AND SIGNAL COMMUNICATIONS UPGRADE- CITYWIDE Infrastructure Project
Project Description: This project will upgrade all traffic signals safety lights to LED and install communication system upgrades to 42 signals citywide. Upgraded traffic signal improvements include LED street lights, signal wiring, vehicle heads, controller cabinets, fiber cable, ethernet switches, wireless radios, and related communication equipment to improve safety and operations with optimized traffic signal timing coordination. Signal timing coordination will be improved along the Butterfield Stage Road and Ynez Road corridors.
Benefit: This project will upgrade the City's traffic signal safety lights to LED, Sustainable and Resilient City, and upgrade traffic signal communication system equipment to improve mobility and connectivity.
Core Value: Transportation Mobility and Connectivity
Project Status: This is a new project.
Department: Public Works - Account No. 210.265.999.5800.PW23-13 Level: I
2023-24
2023-24 Mid-
2023-24
Prior Years
2022-23 Adopted
Year
Revised
2024-25 2025-26
2026-27 2027-28
Total Project
Project Cost:
Actuals
Adjusted Budget
Requests
Budget
Projected Projected
Projected Projected
Cost
Administration
50,000
(30,000)
20,000
20,000
Construction
2,661,397
2,661,397
Construction Engineering
225,000
225,000
Design & Environmental
205,000
144,503
349,503
349,503
Furnishings & Equipment
Total Expenditures
255,000
114,503
369,503
2,886,397
3 255 900
Source of Funds:
HSIP- Cycle 110)
205,000 29,580 234,580 2,206,730
2,441,310
DI - Traffic Signal
50,000 84,923 134,923 459,667
594,590
Measure S
220,000
220,000
Total Funding
255,000 114,503 369,503 2,886,397
3,255,900
Future Operating & Maintenance Costs:
Total Operating Costs
(1) Highway Safety Improvement Program - Cycle 11 awarded on March 9, 2023 2023-24 Mid -Year Requests - advance $114,503 from FY24-25 to FY23-24, for City match on HSIP Grant
Aft
The Heart of Southern California
Wine Country
TEMECULA CREEK FENCING
Infrastructure Project
Project Description: This project will include the construction of a commercial grade wrought iron fence, or a similar type, along the north side of Temecula Creek between Pechanga Parkway and east of Jedediah Smith Road.
Benefit: This project will deter homeless encampments in Temecula Creek and protect the City's mitigation sites.
Core Value: Healthy and Livable City
Project Status: This is a new project.
Department: Public Works - PW23-23
Level: I
City of Temecula
Fiscal Years 2024-28
Capital Improvement Program
2023-24 2023-24 Mid-
2023-24
Prior Years
2022-23 Adopted Year
Revised 2024-25
2025-26 2026-27 2027-28 Total Project
Project Cost:
Actuals
Adjusted Budget Requests
Budget Projected
Projected Projected Projected Cost
Administration
115,000
115,000
115,000
Construction
315,000
315,000
315,000
Construction Engineering
30,000
30,000
30,000
Design & Environmental
40,000
40,000
40,000
Tnral FxnPndifurac
- Snn_nnn
5nn.nno
Snn.nnn
COVID-19 Pandemic Community 500,000 500,000 500,000
Reinvestment
Total Funding 500,000 500,000 500,000
Future Operating & Maintenance Costs:
Total Operating Costs
1) Covid-19 - AOB Account Code 110.199.104.5409- reallocate funds from AOP to CIP
RESOLUTION NO.2024-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TEMECULA REVISING THE SALARY SCHEDULE
THE CITY COUNCIL OF THE CITY OF TEMECULA DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. The Salary Schedule, attached hereto, is hereby adopted pursuant to Section 45001 of the California Government Code. Such list is attached to this Resolution and incorporated herein by this reference.
Section 2. The Salary Schedule shall become effective July 1, 2024, and may be, thereafter, amended.
Section 3. The City Manager shall implement the attached Salary Schedule and has the authority to select and appoint employees and approve Executive Staff employment agreements in accordance with the City of Temecula's Municipal Code and personnel policies.
Section 4. In accordance with City of Temecula Municipal Code Section 2.6.030, the City Manager shall administer the City personnel system. This resolution specifically authorizes the City Manager to fix and alter the titles, compensation, and number of positions in the Schedule of Authorized Positions as needed, subject to the total personnel expenditure budget limitations approved by the City Council.
Section 5. All prior resolutions and parts of this resolution in conflict with this Resolution are hereby rescinded.
Section 6. The City Clerk shall certify to the adoption of this Resolution.
PASSED, APPROVED, AND ADOPTED by the City Council of the City of Temecula this 27t" day of February, 2024.
James Stewart, Mayor
ATTEST:
Randi Johl, City Clerk
[SEAL]
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss
CITY OF TEMECULA )
I, Randi Johl, City Clerk of the City of Temecula, do hereby certify that the foregoing Resolution No. 2024- was duly and regularly adopted by the City Council of the City of Temecula at a meeting thereof held on the 27th day of February, 2024, by the following vote:
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
Randi Johl, City Clerk
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by City Council on February 27, 2024
Class Family / Title Level Class Code Time Base
ADMINISTRATIVE
Executive Assistant 4 951-004 Hourly
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 Monthly
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
Annually
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
Senior Administrative Assistant 4 952-004 Hourly
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 Monthly
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
Annually
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
Administrative Assistant 3 953-003 Hourly
30.10 30.86
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 Monthly
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
Annually
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
Senior Office Specialist 2 954-002 Hourly
27.95 28.64
29.37 30.10
30.86 31.62
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 Monthly
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
Annually
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
Office Specialist II 1 955-001 Hourly
25.32 25.95
26.60 27.27
27.95 28.64
29.37 30.10
30.86 31.62
32.41 33.23
34.06 34.91
35.78 Monthly
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
Annually
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
Office Specialist 1 1 956-001 Hourly
24.10 24.71
25.32 25.95
26.60 27.27
27.95 28.64
29.37 30.10
30.86 31.62
32.41 33.23
34.06 Monthly
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
Annually
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
Office Aide 1 959-001 Hourly
18.83 19.30
19.78 20.28
20.78 21.30
21.83 22.38
22.93 23.51
24.10 24.71
25.32 25.95
26.60 Monthly
3,263.87
3,345.33
3,428.53
3,515.20
3,601.87
3,692.00
3,783.87
3,879.20
3,974.53
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
Annually
39,166.40
40,144.00
41,142.40
42,182.40
43,222.40
44,304.00
45,406.40
46,550.40
47,694.40
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
ANALYST
Principal Management Analyst 7 901-007 Hourly
50.56 51.82
53.11 54.44
55.80 57.20
58.63 60.09
61.60 63.13
64.71 66.33
67.99 69.69
71.43 Monthly
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
Annually
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
Senior Management Analyst 6 902-006 Hourly
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 57.20
58.63 60.09
61.60 63.13
64.71 Monthly
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
Annually
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
Management Analyst 5 903-005 Hourly
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 Monthly
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
Annually
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
Management Assistant 4 904-004 Hourly
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 Monthly
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
Annually
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
Management Aide III 3 905-003 Hourly
29.37 30.10
30.86 31.62
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 Monthly
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
Annually
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
Management Aide II 2 906-002 Hourly
26.60 27.27
27.95 28.64
29.37 30.10
30.86 31.62
32.41 33.23
34.06 34.91
35.78 36.67
37.59 Monthly
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
Annually
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
Management Aide 1 1 907-001 Hourly
24.10 24.71
25.32 25.95
26.60 27.27
27.95 28.64
29.37 30.10
30.86 31.62
32.41 33.23
34.06 Monthly
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
Annually
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
Intern 1 908-001 Hourly
17.92 18.37
18.83 19.30
19.78 20.28
20.78 21.30
21.83 22.38
22.93 Monthly
3,106.13
3,184.13
3,263.87
3,345.33
3,428.53
3,515.20
3,601.87
3,692.00
3,783.87
3,879.20
3,974.53
Annually
37,273.60
38,209.60
39,166.40
40,144.00
41,142.40
42,182.40
43,222.40
44,304.00
45,406.40
46,550.40
47,694.40
PAGE 1 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by City Council on February 27, 2024
Salary Steps IMM Only
Class Family / Title Level Class Code Time Base
COMMUNITY DEVELOPMENT
Director of Community Development 8 300-008 Hourly
89.21 91.43
93.73 96.06
98.47 100.93
103.45
106.04
108.68
111.41
114.19
117.05
119.97
122.97
126.05
Monthly
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
18,380.27
18,837.87
19,311.07
19,792.93
20,288.67
20,794.80
21,314.80
21,848.67
Annually
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
220,563.20
226,054.40
231,732.80
237,515.20
243,464.00
249,537.60
255,777.60
262,184.00
Asst Dir. of Community Development 7 330-007 Hourly
73.22 75.05
76.92 78.85
80.81 82.83
84.91 87.03
89.21 91.43
93.73 96.06
98.47 100.93
103.45
Monthly
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
Annually
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
COMMUNITY DEVELOPMENT - BUILDING & SAFETY
Building Official 7 331-007 Hourly
66.33 67.99
69.69 71.43
73.22 75.05
76.92 78.85
80.81 82.83
84.91 87.03
89.21 91.43
93.73 Monthly
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
Annually
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
Field Supervisor- Building 4 330-004 Hourly
53.11 54.44
55.80 57.20
58.63 60.09
61.60 63.13
64.71 66.33
67.99 Monthly
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
Annually
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
Plan Checker 4 308-004 Hourly
50.56 51.82
53.11 54.44
55.80 57.20
58.63 60.09
61.60 63.13
64.71 Monthly
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
Annually
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
Senior Building Inspector 3 332-003 Hourly
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 57.20
58.63 Monthly
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
Annually
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
Building Inspector II 2 333-002 Hourly
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 51.82
53.11 Monthly
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
Annually
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
Building Inspector 1 1 334-001 Hourly
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 Monthly
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
Annually
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
COMMUNITY DEVELOPMENT - CODE ENFORCEMENT
Field Supervisor - Code Enforcement 4 343-004 Hourly
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 Monthly
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
Annually
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
Senior Code Enforcement Officer 3 340-003 Hourly
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 Monthly
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
Annually
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
Code Enforcement Officer 11 2 341-002 Hourly
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 Monthly
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
Annually
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
Code Enforcement Officer 1 1 342-001 Hourly
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 Monthly
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
Annually
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
COMMUNITY DEVELOPMENT - PLANNING
Planning Manager 7 301-007 Hourly
63.13 64.71
66.33 67.99
69.69 71.43
73.22 75.05
76.92 78.85
80.81 82.83
84.91 87.03
89.21 Monthly
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
Annually
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
Principal Planner 6 302-006 Hourly
57.20 58.63
60.09 61.60
63.13 64.71
66.33 67.99
69.69 71.43
73.22 75.05
76.92 78.85
80.81 Monthly
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
Annually
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
Senior Planner 5 303-005 Hourly
51.82 53.11
54.44 55.80
57.20 58.63
60.09 61.60
63.13 64.71
66.33 67.99
69.69 71.43
73.22 Monthly
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
Annually
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
PAGE 2 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by City Council on February 27, 2024
Class Family / Title Level Class Code Time Base
Salary Steps
Associate Planner II 4 304-004 Hourly
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 58.63
60.09 Monthly
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
Annually
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
Associate Planner 1 3 305-003 Hourly
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 Monthly
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
Annually
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
Assistant Planner 2 306-002 Hourly
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 Monthly
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
Annually
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
Planning Technician 1 307-001 Hourly
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 Monthly
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
Annually
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
COMMUNITY DEVELOPMENT - SERVICES
CommDev Processing Supervisor 4 320-004 Hourly
43.59 44.68
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 Monthly
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
Annually
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
Senior CommDev Technician 3 321-003 Hourly
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 Monthly
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
Annually
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
CommDev Technician 11 2 322-002 Hourly
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 Monthly
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
Annually
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
CommDev Technician 1 1 323-001 Hourly
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 Monthly
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
Annually
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
CITY CLERK
Director of Legislative Affairs/City Clerk 8 500-009 Hourly
87.03 89.21
91.43 93.73
96.06 98.47
100.93
103.45
106.04
108.68
111.41
114.19
117.05
119.97
122.97
Monthly
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
18,380.27
18,837.87
19,311.07
19,792.93
20,288.67
20,794.80
21,314.80
Annually
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
220,563.20
226,054.40
231,732.80
237,515.20
243,464.00
249,537.60
255,777.60
Deputy City Clerk 7 501-007 Hourly
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 58.63
60.09 61.60
63.13 Monthly
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
Annually
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
Records Manager 6 510-006 Hourly
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 Monthly
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
Annually
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
Records Supervisor 4 511-004 Hourly
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 Monthly
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
Annually
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
Senior Records Coordinator 3 512-003 Hourly
28.64 29.37
30.10 30.86
31.62 32.41
33.23 34.06
34.91 35.78
36.67 Monthly
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
Annually
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
Records Coordinator 2 513-002 Hourly
25.95 26.60
27.27 27.95
28.64 29.37
30.10 30.86
31.62 32.41
33.23 Monthly
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
Annually
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
Records Technician 1 514-001 Hourly
23.51 24.10
24.71 25.32
25.95 26.60
27.27 27.95
28.64 29.37
30.10 Monthly
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
Annually
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
PAGE 3 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by City Council on February 27, 2024
Class Family / Title Level Class Code Time Base
CITY MANAGER
City Manager (per Employment Contract) 9 100-009 Hourly 167.76
Monthly
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
29,078.40
Annually
348,940.80
Assistant City Manager 8 101-008 Hourly
107.93
110.63
113.40
116.24
119.15
122.12
125.17
128.30
131.52
134.79
138.17
141.63
145.17
148.80
152.51
Monthly
18,707.87
19,175.87
19,656.00
20,148.27
20,652.67
21,167.47
21,696.13
22,238.67
22,796.80
23,363.60
23,949.47
24,549.20
25,162.80
25,792.00
26,435.07
Annually
224,494.40
230,110.40
235,872.00
241,779.20
247,832.00
254,009.60
260,353.60
266,864.00
273,561.60
280,363.20
287,393.60
294,590.40
301,953.60
309,504.00
317,220.80
Deputy City Manager 8 102-008 Hourly
98.13 100.58
103.09
105.68
108.31
111.02
113.80
116.64
119.55
122.55
125.61
128.75
131.97
135.27
138.65
Monthly
17,009.20
17,433.87
17,868.93
18,317.87
18,773.73
19,243.47
19,725.33
20,217.60
20,722.00
21,242.00
21,772.40
22,316.67
22,874.80
23,446.80
24,032.67
Annually
204,110.40
209,206.40
214,427.20
219,814.40
225,284.80
230,921.60
236,704.00
242,611.20
248,664.00
254,904.00
261,268.80
267,800.00
274,497.60
281,361.60
288,392.00
Assistant to the City Manager 8 103-008 Hourly
66.33 67.99
69.69 71.43
73.22 75.05
76.92 78.85
80.81 82.83
84.91 87.03
89.21 91.43
93.73 Monthly
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
Annually
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
Economic Development Manager 6 120-006 Hourly
60.09 61.60
63.13 64.71
66.33 67.99
69.69 71.43
73.22 75.05
76.92 78.85
80.81 82.83
84.91 Monthly
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
Annually
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
COMMUNITY SERVICES
Director of Community Services 8 600-008 Hourly
87.03 89.21
91.43 93.73
96.06 98.47
100.93
103.45
106.04
108.68
111.41
114.19
117.05
119.97
122.97
Monthly
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
18,380.27
18,837.87
19,311.07
19,792.93
20,288.67
20,794.80
21,314.80
Annually
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
220,563.20
226,054.40
231,732.80
237,515.20
243,464.00
249,537.60
255,777.60
Asst Director of Community Services 7 601-007 Hourly
71.43 73.22
75.05 76.92
78.85 80.81
82.83 84.91
87.03 89.21
91.43 93.73
96.06 98.47
100.93
Monthly
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
Annually
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
Community Services Superintendent 6 602-006 Hourly
64.71 66.33
67.99 69.69
71.43 73.22
75.05 76.92
78.85 80.81
82.83 84.91
87.03 89.21
91.43 Monthly
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
Annually
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
Community Services Manager 5 603-005 Hourly
58.63 60.09
61.60 63.13
64.71 66.33
67.99 69.69
71.43 73.22
75.05 76.92
78.85 80.81
82.83 Monthly
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
Annually
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
Community Services Supervisor II 4 610-004 Hourly
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 Monthly
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
Annually
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
Community Services Supervisor 1 4 611-004 Hourly
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 Monthly
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
Annually
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
Community Services Coordinator 11 3 612-003 Hourly
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 Monthly
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
Annually
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
Community Services Coordinator 1 3 613-003 Hourly
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 Monthly
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
Annually
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
Community Services Specialist 11 2 614-002 Hourly
29.37 30.10
30.86 31.62
32.41 33.23
34.06 34.91
35.78 36.67
37.59 Monthly
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
Annually
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
Community Services Specialist 1 2 615-002 Hourly
27.95 28.64
29.37 30.10
30.86 31.62
32.41 33.23
34.06 34.91
35.78 Monthly
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
Annually
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
Community Services Assistant 1 616-001 Hourly
26.60 27.27
27.95 28.64
29.37 30.10
30.86 31.62
32.41 33.23
34.06 Monthly
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
Annually
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
PAGE 4 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by CitV Council on February 27, 2024
Class Family / Title Level Class Code Time Base
24.71 25.32
25.95 26.60
27.27 salary Steps
27.95 28.64
29.37 30.10
30.86 31.62
Senior Recreation Leader 1 617-001 Hourly
Monthly
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
Annually
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
Recreation Leader 1 618-001 Hourly
22.93 23.51
24.10 24.71
25.32 25.95
26.60 27.27
27.95 28.64
29.37 Monthly
3,974.53
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
Annually
47,694.40
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
Recreation Assistant 1 619-001 Hourly
21.30 21.83
22.38 22.93
23.51 24.10
24.71 25.32
25.95 26.60
27.27 Monthly
3,692.00
3,783.87
3,879.20
3,974.53
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
Annually
44,304.00
45,406.40
46,550.40
47,694.40
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
COMMUNITY SERVICES - AQUATICS
Aquatics Supervisor II 4 620-004 Hourly
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 Monthly
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
Annually
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
Aquatics Supervisor 1 4 621-004 Hourly
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 Monthly
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
Annually
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
Aquatics Coordinator 3 622-003 Hourly
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 Monthly
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
Annually
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
Lead Lifeguard 2 623-002 Hourly
24.71 25.32
25.95 26.60
27.27 27.95
28.64 29.37
30.10 30.86
31.62 Monthly
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
Annually
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
Senior Lifeguard 1 624-001 Hourly
22.93 23.51
24.10 24.71
25.32 25.95
26.60 27.27
27.95 28.64
29.37 Monthly
3,974.53
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
Annually
47,694.40
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
Lifeguard 1 625-001 Hourly
21.30 21.83
22.38 22.93
23.51 24.10
24.71 25.32
25.95 26.60
27.27 Monthly
3,692.00
3,783.87
3,879.20
3,974.53
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
Annually
44,304.00
45,406.40
46,550.40
47,694.40
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
Water Safety Instructor 1 626-001 Hourly
21.30 21.83
22.38 22.93
23.51 24.10
24.71 25.32
25.95 26.60
27.27 Monthly
3,692.00
3,783.87
3,879.20
3,974.53
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
Annually
44,304.00
45,406.40
46,550.40
47,694.40
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
COMMUNITY SERVICES - DAY CAMP
Day Camp Director 1 654-001 Hourly
25.95 26.60
27.27 27.95
28.64 29.37
30.10 30.86
31.62 32.41
33.23 Monthly
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
Annually
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
Assistant Day Camp Director 1 655-001 Hourly
23.51 24.10
24.71 25.32
25.95 26.60
27.27 27.95
28.64 29.37
30.10 Monthly
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
Annually
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
COMMUNITY SERVICES - THEATER
Theater Technical Coordinator II 3 640-003 Hourly
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 Monthly
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
Annually
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
Theater Technical Coordinator 1 3 641-003 Hourly
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 Monthly
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
Annually
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
Theater Technical Specialist 11 2 642-002 Hourly
29.37 30.10
30.86 31.62
32.41 33.23
34.06 34.91
35.78 36.67
37.59 Monthly
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
Annually
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
Theater Technical Specialist 1 2 643-002 Hourly
27.95 28.64
29.37 30.10
30.86 31.62
32.41 33.23
34.06 34.91
35.78 Monthly
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
Annually
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
PAGE 5 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by City Council on February 27, 2024
Class Family / Title Level Class Code Time Base
25.32 25.95 26.60 27.27 27.95 28.64
29.37 30.10 30.86 31.62 32.41
Theater Technical Assistant 1 644-001 Hourly
Monthly
4,388.80 4,498.00 4,610.67 4,726.80 4,844.67 41964.27
5,090.80 5,217.33 5,349.07 5,480.80 5,617.73
Annually
52,665.60 53,976.00 55,328.00 56,721.60 58,136.00 59,571.20 61,089.60 62,608.00 64,188.80 65,769.60 67,412.80
FINANCE
Director of Finance 8 200-008 Hourly
89.21 91.43
93.73 96.06
98.47 100.93
103.45
106.04
108.68
111.41
114.19
117.05
119.97
122.97
126.05
Monthly
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
18,380.27
18,837.87
19,311.07
19,792.93
20,288.67
20,794.80
21,314.80
21,848.67
Annually
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
220,563.20
226,054.40
231,732.80
237,515.20
243,464.00
249,537.60
255,777.60
262,184.00
Assistant Director of Finance 7 201-007 Hourly
73.22 75.05
76.92 78.85
80.81 82.83
84.91 87.03
89.21 91.43
93.73 96.06
98.47 100.93
103.45
Monthly
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
Annually
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
Fiscal Services Manager 6 202-006 Hourly
60.09 61.60
63.13 64.71
66.33 67.99
69.69 71.43
73.22 75.05
76.92 78.85
80.81 82.83
84.91 Monthly
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
Annually
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
Finance Manager 5 204-005 Hourly
51.82 53.11
54.44 55.80
57.20 58.63
60.09 61.60
63.13 64.71
66.33 67.99
69.69 71.43
73.22 Monthly
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
Annually
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
FINANCE - ACCOUNTING
Senior Accountant 4 240-004 Hourly
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 58.63
60.09 61.60
63.13 64.71
66.33 Monthly
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
Annually
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
Accountant II 3 241-003 Hourly
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 58.63
60.09 Monthly
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
Annually
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
Accountant 1 3 242-003 Hourly
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 Monthly
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
Annually
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
FINANCE - ACCOUNTING SUPPORT
Accounting Support Supervisor 4 250-004 Hourly
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 Monthly
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
Annually
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
Senior Accounting Technician 3 251-003 Hourly
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 Monthly
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
Annually
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
Accounting Technician II 2 252-002 Hourly
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 Monthly
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
Annually
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
Accounting Technician 1 2 253-002 Hourly
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 Monthly
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
Annually
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
Accounting Assistant 1 254-001 Hourly
28.64 29.37
30.10 30.86
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 Monthly
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
Annually
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
Cashier 1 230-001 Hourly
28.64 29.37
30.10 30.86
31.62 32.41
33.23 34.06
34.91 35.78
36.67 Monthly
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
Annually
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
FINANCE - BUSINESS LICENSE
Business License Supervisor 4 260-004 Hourly
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 Monthly
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
Annually
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
PAGE 6 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by City Council on February 27, 2024
Class Family / Title Level Class Code Time Base
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 Senior Business License Technician 3 261-003 Hourly Monthly
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53 6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
Annually
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40 82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
Business License Technician 2 262-002 Hourly
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 Monthly
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
Annually
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
Business License Assistant 1 263-001 Hourly
28.64 29.37
30.10 30.86
31.62 32.41
33.23 34.06
34.91 35.78
36.67 Monthly
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
Annually
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
FINANCE - PAYROLL
Payroll Manager 5 220-005 Hourly
48.12 49.32
50.56 51.82
53.11 54.44
55.80 57.20
58.63 60.09
61.60 63.13
64.71 66.33
67.99 Monthly
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
Annually
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
Payroll Administrator 4 222-004 Hourly
43.59 44.68
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 57.20
58.63 60.09
61.60 Monthly
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
Annually
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
Payroll Supervisor 4 221-004 Hourly
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 57.20
58.63 Monthly
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
Annually
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
Senior Payroll Coordinator 3 223-003 Hourly
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 51.82
53.11 Monthly
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
Annually
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
Payroll Coordinator 2 224-002 Hourly
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 Monthly
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
Annually
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
Payroll Technician 1 225-001 Hourly
30.86 31.62
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 Monthly
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
Annually
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
FINANCE - PURCHASING
Purchasing Manager 5 203-005 Hourly
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 58.63
60.09 61.60
63.13 Monthly
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
Annually
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
Purchasing Supervisor 4 204-004 Hourly
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 Monthly
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
Annually
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
Senior Buyer 3 205-003 Hourly
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 Monthly
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
Annually
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
Buyer II 2 206-002 Hourly
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 Monthly
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
Annually
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
Buyer 1 2 207-002 Hourly
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 Monthly
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
Annually
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
Purchasing Assistant 1 208-001 Hourly
28.64 29.37
30.10 30.86
31.62 32.41
33.23 34.06
34.91 35.78
36.67 Monthly
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
Annually
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
FIRE
Field Supervisor - Fire 4 353-004 Hourly
58.63 60.09
61.60 63.13
64.71 66.33
67.99 69.69
71.43 73.22
75.05 Monthly
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
Annually
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
PAGE 7 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by City Council on February 27, 2024
Class Family / Title Level Class Code Time Base
nommonmr--
S3.11
54.44 SS.80
57.20 S8.63
Salary Steps
60.09 I
61.60 63.13
64.71 66.33
67.99 Senior Fire Inspector 4 350-003 Hourly
Monthly
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
Annually
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
Fire Inspector II 2 351-002 Hourly
48.12 49.32
50.56 51.82
53.11 54.44
55.80 57.20
58.63 60.09
61.60 Monthly
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
Annually
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
Fire Inspector 1 1 352-001 Hourly
43.59 44.68
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 Monthly
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
Annually
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
HUMAN RESOURCES
Director of HR/Risk Management 8 800-008 Hourly
87.03 89.21
91.43 93.73
96.06 98.47
100.93
103.45
106.04
108.68
111.41
114.19
117.05
119.97
122.97
Monthly
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
18,380.27
18,837.87
19,311.07
19,792.93
20,288.67
20,794.80
21,314.80
Annually
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
220,563.20
226,054.40
231,732.80
237,515.20
243,464.00
249,537.60
255,777.60
Asst Director of HR/Risk Management 7 801-007 Hourly
67.99 69.69
71.43 73.22
75.05 76.92
78.85 80.81
82.83 84.91
87.03 89.21
91.43 93.73
96.06 Monthly
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
Annually
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
HR Supervisor 4 804-004 Hourly
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 Monthly
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
Annually
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
Senior H R Technician 3 805-003 Hourly
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 Monthly
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
Annually
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
HR Technician 11 2 806-002 Hourly
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 Monthly
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
Annually
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
HR Technician 1 2 807-002 Hourly
30.86 31.62
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 Monthly
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
Annually
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
HR Assistant 1 808-001 Hourly
27.95 28.64
29.37 30.10
30.86 31.62
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 Monthly
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
Annually
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
INFORMATION TECHNOLOGY
Director of IT/Support Services 8 700-008 Hourly
87.03 89.21
91.43 93.73
96.06 98.47
100.93
103.45
106.04
108.68
111.41
114.19
117.05
119.97
122.97
Monthly
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
18,380.27
18,837.87
19,311.07
19,792.93
20,288.67
20,794.80
21,314.80
Annually
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
220,563.20
226,054.40
231,732.80
237,515.20
243,464.00
249,537.60
255,777.60
Asst Director of IT/Support Services 7 701-007 Hourly
71.43 73.22
75.05 76.92
78.85 80.81
82.83 84.91
87.03 89.21
91.43 93.73
96.06 98.47
100.93
Monthly
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
Annually
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
IT Manager 6 702-006 Hourly
64.71 66.33
67.99 69.69
71.43 73.22
75.05 76.92
78.85 80.81
82.83 84.91
87.03 89.21
91.43 Monthly
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
Annually
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
IT Administrator S 703-005 Hourly
58.63 60.09
61.60 63.13
64.71 66.33
67.99 69.69
71.43 73.22
75.05 76.92
78.85 80.81
82.83 Monthly
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
Annually
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
IT Supervisor 4 704-004 Hourly
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 58.63
60.09 61.60
63.13 Monthly
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
Annually
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
Senior IT Specialist 3 705-003 Hourly
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 Monthly
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
Annually
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
PAGE 8 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by City Council on February 27, 2024
-
Salary Steps
I
MCP
Only
Class Family / Title Level Class Code Time Base7"-
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 IT Specialist II 2 706-002 Hourly
Monthly
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
Annually
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
IT Specialist 1 2 707-002 Hourly
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 Monthly
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
Annually
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
IT Technician II 1 708-001 Hourly
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 Monthly
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
Annually
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
IT Technician 1 1 709-001 Hourly
30.10 30.86
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 Monthly
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
Annually
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
MEDIA/MARKETING
Multimedia Coordinator 3 921-004 Hourly
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 Monthly
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
Annually
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
Multimedia Specialist II 2 922-003 Hourly
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 Monthly
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
Annually
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
Multimedia Specialist 1 2 923-002 Hourly
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 Monthly
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
Annually
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
Multimedia Assistant 1 924-001 Hourly
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 Monthly
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
Annually
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
PUBLIC WORKS
Director of PW/City Engineer 8 400-008 Hourly
89.21 91.43
93.73 96.06
98.47 100.93
103.45
106.04
108.68
111.41
114.19
117.05
119.97
122.97
126.05
Monthly
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
18,380.27
18,837.87
19,311.07
19,792.93
20,288.67
20,794.80
21,314.80
21,848.67
Annually
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
220,563.20
226,054.40
231,732.80
237,515.20
243,464.00
249,537.60
255,777.60
262,184.00
Assistant Director of Public Works 7 400-007 Hourly
78.85 80.81
82.83 84.91
87.03 89.21
91.43 93.73
96.06 98.47
100.93
103.45
106.04
108.68
111.41
Monthly
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
18,380.27
18,837.87
19,311.07
Annually
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
220,563.20
226,054.40
231,732.80
Program Manager 7 402-007 Hourly
50.56 51.82
53.11 54.44
55.80 57.20
58.63 60.09
61.60 63.13
64.71 66.33
67.99 69.69
71.43 Monthly
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
Annually
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
PUBLIC WORKS - CUSTODIAL
Custodian II 2 460-002 Hourly
21.83 22.38
22.93 23.51
24.10 24.71
25.32 25.95
26.60 27.27
27.95 Monthly
3,783.87
3,879.20
3,974.53
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
Annually
45,406.40
46,550.40
47,694.40
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
Custodian 1 1 461-001 Hourly
19.78 20.28
20.78 21.30
21.83 22.38
22.93 23.51
24.10 24.71
25.32 Monthly
3,428.53
3,515.20
3,601.87
3,692.00
3,783.87
3,879.20
3,974.53
4,075.07
4,177.33
4,283.07
4,388.80
Annually
41,142.40
42,182.40
43,222.40
44,304.00
45,406.40
46,550.40
47,694.40
48,900.80
50,128.00
51,396.80
52,665.60
PUBLIC WORKS - ENGINEERING
Engineering Manager 7 401-007 Hourly
75.05 76.92
78.85 80.81
82.83 84.91
87.03 89.21
91.43 93.73
96.06 98.47
100.93
103.45
106.04
Monthly
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
17,068.13
17,494.53
17,931.33
18,380.27
Annually
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
204,817.60
209,934.40
215,176.00
220,563.20
Principal Civil Engineer 6 402-006 Hourly
67.99 69.69
71.43 73.22
75.05 76.92
78.85 80.81
82.83 84.91
87.03 89.21
91.43 93.73
96.06 Monthly
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
16,650.40
Annually
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
199,804.80
PAGE 9 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by City Council on February 27, 2024
-
Salary Steps
OEM-
MCP
Only
Class Family / Title Level Class Code Time Base7"-
61.60 63.13
64.71 66.33
67.99 69.69
71.43 73.22
75.05 76.92
78.85 80.81
82.83 84.91
87.03 Senior Civil Engineer 5 403-005 Hourly
Monthly
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
Annually
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
Associate Civil Engineer 4 404-004 Hourly
54.44 55.80
57.20 58.63
60.09 61.60
63.13 64.71
66.33 67.99
69.69 Monthly
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
Annually
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
Associate Engineer II 4 405-004 Hourly
51.82 53.11
54.44 55.80
57.20 58.63
60.09 61.60
63.13 64.71
66.33 Monthly
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
Annually
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
Associate Engineer 1 3 406-003 Hourly
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 58.63
60.09 Monthly
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
Annually
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
Assistant Engineer II 2 407-002 Hourly
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 Monthly
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
Annually
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
Assistant Engineer 1 2 408-002 Hourly
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 Monthly
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
Annually
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
Engineering Technician II 1 409-001 Hourly
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 Monthly
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
Annually
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
Engineering Technician 1 1 410-001 Hourly
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 Monthly
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
Annually
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
PUBLIC WORKS - INSPECTIONS
Supervising PW Inspector 4 420-004 Hourly
49.32 50.56
51.82 53.11
54.44 55.80
57.20 58.63
60.09 61.60
63.13 Monthly
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
Annually
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
Senior PW Inspector 3 421-003 Hourly
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 Monthly
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
Annually
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
PW Inspector 11 2 422-002 Hourly
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 Monthly
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
Annually
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
PW Inspector 1 1 423-001 Hourly
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 Monthly
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
Annually
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
PUBLIC WORKS - MAINTENANCE
Maintenance Manager 7 430-007 Hourly
66.33 67.99
69.69 71.43
73.22 75.05
76.92 78.85
80.81 82.83
84.91 87.03
89.21 91.43
93.73 Monthly
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
15,085.20
15,463.07
15,847.87
16,246.53
Annually
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
181,022.40
185,556.80
190,174.40
194,958.40
Maintenance Superintendent 6 431-006 Hourly
60.09 61.60
63.13 64.71
66.33 67.99
69.69 71.43
73.22 75.05
76.92 78.85
80.81 82.83
84.91 Monthly
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
13,667.33
14,007.07
14,357.20
14,717.73
Annually
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
164,008.00
168,084.80
172,286.40
176,612.80
PUBLIC WORKS - LANDSCAPE
Maintenance Supervisor - Landscape 5 443-005 Hourly
49.32 50.56
51.82 53.11
54.44 55.80
57.20 58.63
60.09 61.60
63.13 64.71
66.33 67.99
69.69 Monthly
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
Annually
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
Field Supervisor - Landscape 4 444-004 Hourly
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 Monthly
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
Annually
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
PAGE 10 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted by City Council on February 27, 2024
Class Family / Title Level Class Code Time Base
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 Senior Landscape Inspector 3 440-003 Hourly
Monthly
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
Annually
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
Landscape Inspector II 2 441-002 Hourly
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 Monthly
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
Annually
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
Landscape Inspector 1 1 442-001 Hourly
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 Monthly
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
Annually
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
PUBLIC WORKS - PARK ATTENDANT
Supervising Park Attendant 4 490-004 Hourly
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 Monthly
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
Annually
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
Park Attendant III 3 491-003 Hourly
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 Monthly
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
Annually
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
Park Attendant 11 2 492-002 Hourly
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 Monthly
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
Annually
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
Park Attendant 1 1 493-001 Hourly
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 Monthly
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
Annually
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
PUBLIC WORKS - STREETS/PARKS
Maintenance Supervisor - Streets/Parks 5 432-005 Hourly
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 57.20
58.63 60.09
61.60 63.13
64.71 Monthly
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
Annually
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
Field Supervisor - Streets/Parks 4 433-004 Hourly
34.91 35.78
36.67 37.59
38.53 39.49
40.48 41.49
42.53 43.59
44.68 Monthly
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
Annually
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
Lead Maintenance Worker - Streets/Parks 3 434-003 Hourly
31.62 32.41
33.23 34.06
34.91 35.78
36.67 37.59
38.53 39.49
40.48 Monthly
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
Annually
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
Maintenance Worker II - Streets/Parks 2 435-002 Hourly
28.64 29.37
30.10 30.86
31.62 32.41
33.23 34.06
34.91 35.78
36.67 Monthly
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
Annually
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
Maintenance Worker I - Streets/Parks 1 436-001 Hourly
25.95 26.60
27.27 27.95
28.64 29.37
30.10 30.86
31.62 32.41
33.23 Monthly
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
Annually
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
PUBLIC WORKS - FACILITIES
Maintenance Supervisor- Facilities 5 432-005 Hourly
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 57.20
58.63 60.09
61.60 63.13
64.71 Monthly
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
Annually
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
Field Supervisor - Facilities 4 472-004 Hourly
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 51.82
53.11 Monthly
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
Annually
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
Lead Maintenance Worker - Facilities 3 473-003 Hourly
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 Monthly
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
Annually
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
Maintenance Worker II - Facilities 2 474-002 Hourly
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 Monthly
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
Annually
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
PAGE 11 OF 12
CITY OF TEMECULA
SALARY SCHEDULE
EFFECTIVE June 29, 2024
Adopted bV CitV Council on February 27, 2024
Class Family / Title Level Class Code Time Base
30.86 31.62 32.41 33.23 34.06 34.91 35.78 36.67 37.59 38.53 39.49 Maintenance Worker I - Facilities 1 475-001 Hourly
Monthly
5,349.07 5,480.80 5,617.73 5,759.87 5,903.73 6,051.07 6,201.87 6,356.13 6,515.60 6,678.53 6,844.93 Annually
64,188.80 65,769.60 67,412.80 69,118.40 70,844.80 72,612.80 74,422.40 76,273.60 78,187.20 80,142.40 82,139.20
PUBLIC WORKS - TRADES
Maintenance Supervisor -Trades 5 482-005 Hourly
48.12 49.32
50.56 51.82
53.11 54.44
55.80 57.20
58.63 60.09
61.60 63.13
64.71 66.33
67.99 Monthly
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
Annually
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
Field Supervisor -Trades 4 483-004 Hourly
43.59 44.68
45.80 46.95
48.12 49.32
50.56 51.82
53.11 54.44
55.80 Monthly
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
Annually
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
Lead Maintenance Worker - Trades 3 484-003 Hourly
39.49 40.48
41.49 42.53
43.59 44.68
45.80 46.95
48.12 49.32
50.56 Monthly
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
Annually
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
Maintenance Worker II - Trades 2 485-002 Hourly
35.78 36.67
37.59 38.53
39.49 40.48
41.49 42.53
43.59 44.68
45.80 Monthly
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
Annually
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
Maintenance Worker I -Trades 1 486-001 Hourly
32.41 33.23
34.06 34.91
35.78 36.67
37.59 38.53
39.49 40.48
41.49 Monthly
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
6,356.13
6,515.60
6,678.53
6,844.93
7,016.53
7,191.60
Annually
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
76,273.60
78,187.20
80,142.40
82,139.20
84,198.40
86,299.20
PUBLIC WORKS - TRAFFIC SIGNALS
Maintenance Supervisor - Signals 5 453-005 Hourly
54.44 55.80
57.20 58.63
60.09 61.60
63.13 64.71
66.33 67.99
69.69 71.43
73.22 75.05
76.92 Monthly
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
11,216.40
11,497.20
11,784.93
12,079.60
12,381.20
12,691.47
13,008.67
13,332.80
Annually
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
134,596.80
137,966.40
141,419.20
144,955.20
148,574.40
152,297.60
156,104.00
159,993.60
Field Supervisor - Signals 4 454-004 Hourly
49.32 50.56
51.82 53.11
54.44 55.80
57.20 58.63
60.09 61.60
63.13 Monthly
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
10,162.53
10,415.60
10,677.33
10,942.53
Annually
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
121,950.40
124,987.20
128,128.00
131,310.40
Senior Signal Technician 3 450-003 Hourly
44.68 45.80
46.95 48.12
49.32 50.56
51.82 53.11
54.44 55.80
57.20 Monthly
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
9,205.73
9,436.27
9,672.00
9,914.67
Annually
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
110,468.80
113,235.20
116,064.00
118,976.00
Signal Technician II 2 451-002 Hourly
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 50.56
51.82 Monthly
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
8,763.73
8,982.13
Annually
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
105,164.80
107,785.60
Signal Technician 1 2 452-002 Hourly
38.53 39.49
40.48 41.49
42.53 43.59
44.68 45.80
46.95 48.12
49.32 Monthly
6,678.53
6,844.93
7,016.53
7,191.60
7,371.87
7,555.60
7,744.53
7,938.67
8,138.00
8,340.80
8,548.80
Annually
80,142.40
82,139.20
84,198.40
86,299.20
88,462.40
90,667.20
92,934.40
95,264.00
97,656.00
100,089.60
102,585.60
SUPPORT SERVICES
Support Services Supervisor 4 720-004 Hourly
27.95 28.64
29.37 30.10
30.86 31.62
32.41 33.23
34.06 34.91
35.78 Monthly
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
5,759.87
5,903.73
6,051.07
6,201.87
Annually
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
69,118.40
70,844.80
72,612.80
74,422.40
Senior Support Services Technician 3 721-003 Hourly
25.32 25.95
26.60 27.27
27.95 28.64
29.37 30.10
30.86 31.62
32.41 Monthly
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
5,217.33
5,349.07
5,480.80
5,617.73
Annually
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
62,608.00
64,188.80
65,769.60
67,412.80
Support Services Technician 2 722-002 Hourly
22.93 23.51
24.10 24.71
25.32 25.95
26.60 27.27
27.95 28.64
29.37 Monthly
3,974.53
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
4,726.80
4,844.67
4,964.27
5,090.80
Annually
47,694.40
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
56,721.60
58,136.00
59,571.20
61,089.60
Support Services Assistant 1 723-001 Hourly
20.78 21.30
21.83 22.38
22.93 23.51
24.10 24.71
25.32 25.95
26.60 Monthly
3,601.87
3,692.00
3,783.87
3,879.20
3,974.53
4,075.07
4,177.33
4,283.07
4,388.80
4,498.00
4,610.67
Annually
43,222.40
44,304.00
45,406.40
46,550.40
47,694.40
48,900.80
50,128.00
51,396.80
52,665.60
53,976.00
55,328.00
PAGE 12 OF 12
RESOLUTION NO. CSD 2024-
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
TEMECULA COMMUNITY SERVICES DISTRICT OF THE
CITY OF TEMECULA AMENDING THE FISCAL YEAR
2023-24 ANNUAL OPERATING BUDGETS
THE BOARD OF DIRECTORS OF THE TEMECULA COMMUNITY SERVICES DISTRICT OF THE CITY OF TEMECULA DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. The purpose of this review is to conduct an analysis of revenues and expenditures to ensure that the Temecula Community Services District (TCSD) maintains a prudent and healthy fiscal position.
Section 2. That each year a Mid -Year review is conducted of all Temecula Community Services (TCSD) operating budgets.
Section 3. That the Mid -Year review has been completed and the recommended adjustments are reflected in the schedules attached hereto as Exhibit A.
Section 4. That the Fiscal Year 2023-24 TCSD operating budgets are amended in accordance with the attached schedules.
PASSED, APPROVED, AND ADOPTED by the Board of Directors of the Temecula Community Services District of the City of Temecula this 27th day of February, 2024.
Zak Schwank, President
ATTEST:
Randi Johl, Secretary
[SEAL]
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss
CITY OF TEMECULA )
I, Randi Johl, Secretary of the Temecula Community Services District of the City of Temecula, do hereby certify that the foregoing Resolution No. CSD 2024- was duly and regularly adopted by the Board of Directors of the Temecula Community Services District of the City of Temecula at a meeting thereof held on the 271h day of February, 2024, by the following vote:
AYES: BOARD MEMBERS:
NOES: BOARD MEMBERS:
ABSTAIN: BOARD MEMBERS:
ABSENT: BOARD MEMBERS:
Randi Johl, Secretary
EXHIBIT A
Temecula Community
Services District
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 190 - TEMECULA COMMUNITY SERVICES DISTRICT FUND
% Change
2023-24 Year to Date 2023-24 Q2 from
2022-23 Current Actuals Revised Requested Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget Revenues by Source
Taxes and Franchises
Special Tax (Measure C)
Licenses, Permits and Service Charges
Contract Classes
Classes/Activities
Facility Rentals
Aquatics
Museum Admissions
Theater Admissions
Sports Leagues & Tournaments
Day Camps
Use of Money and Property
Investment Interest
Other
Reimbursements
Other Reimbursements
Operating Transfers In
Operating Transfers In
Contribution From Measure S
Miscellaneous
Miscellaneous
1,928,969
1,916,505
18,249
1,916,505
0 0.0 %
961,966
1,200,000
638,803
1,200,000
0 0.0 %
64,186
52,890
36,593
67,640
14,750
27.9 %
480,329
345,571
210,398
373,650
28,079
8.1 %
201,975
212,216
123,707
222,966
10,750
5.1 %
96,876
94,485
53,345
94,335
(150)
-0.2 %
314,583
285,000
164,086
295,000
10,000
3.5 %
226,819
182,365
128,005
239,243
56,878
31.2 %
127,288
79,540
12,379
116,721
37,181
46.7 %
36,449
0 2,819
3,947
3,947
100.0 %
0 0
3,117
0 0
0.0%
123,042
85,845
18,077
93,077
7,232
500,000
0 0
0 0
10,295,571
14,304,232
0 13,254,402
(1,049,830)
105,371
68,274
30,771
74,851
6,577
8.4 %
0.0 %
-7.3 %
9.6 %
Total Revenues and Other Sources 15,463,424
18,826,923 1,440,349
17,952,337 (874,586) -4.6 %
Expenditures by Category
Salaries & Benefits 9,574,969
11,074,092 5,037,448
11,074,092 0 0.0 %
Operations & Maintenance 4,272,065
5,200,613 3,465,960
5,239,973 39,360 0.8 %
Internal Service Fund Allocations 2,272,868
2,864,518 1,480,352
2,398,367 (466,151) -16.3 %
Transfers 0
0 0
37,706 37,706 100.0 %
Capital Outlay 0
19,194 0
19,194 0 0.0 %
Total Expenditures and Other Financing
Uses 16,119,901
19,158,417 9,983,761
18,769,332 (389,085) -2.0 %
Excess of Revenues Over (Under) Expenditures (656,477)
(331,494) (8,543,412)
(816,995) (485,501) 146.5 %
Fund Balance, Beginning of Year 1,573,476
916,999
916,999
Fund Balance, End of Year 916,999
585,505
100,004
Fund Description
Citywide Operations reflects the collection of the Special Tax (Measure C) charged to households for recreation programs as well as fees for classes and activities. Accounts for facility operations, maintenance, and community
recreation programs. Measure C was
approved by residents in 1997 at a rate of $74.44 per parcel for the purpose of maintaining the City's parks, recreation facilities, arterial street lighting and traffic signals. The Special Tax revenue is allocated equally between TCSD and the General Fund to fund
both recreation programs and parks maintenance.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 191 - TCSD SERVICE LEVEL "B" STREETLIGHT REPLACEMENT FUND Change
2023-24 Year to Date 2023-24 Q2 from
2022-23 Current Actuals Revised Requested Current
Description Actuals Budget 12-31-2023 Budget Adjustments Budget Revenues by Source
Use of Money and Property
Investment Interest
16,786
0 4,077
8,155
8,155
100.0
Operating Transfers In
Operating Transfers In
200,000
200,000
0 200,000
0 0.0
Total Revenues and Other Sources
216,786
200,000
4,077
208,155
8,155
4.1 Excess of Revenues Over (Under) Expenditures
216,786
200,000
4,077
208,155
8,155
4.1 Fund Balance, Beginning of Year
852,843
1,069,628
1,069,628
Fund Balance, End of Year
1,069,628
1,269,628
1,277,783
Fund Description
This fund was established to accumulate resources for the replacement of street light equipment, poles and lightbulbs, as the City has acquired street lights from Southern California Edison, and to install new street lights as needed throughout the City. Each year, $200,000 is transferred to this fund from the TCSD Service Level "B" Street Lights Fund (Fund 192).
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 192 - TCSD SERVICE LEVEL "B"
STREET LIGHTS FUND
% Change
2023-24
Year to Date 2023-24 Q2
from
2022-23 Current
Actuals Revised Requested
Current
Description Actuals Budget
12-31-2023 Budget Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Assessments 639,690 654,763
4,688 654,763 0
0.0 Use of Money and Property
Investment Interest 6,657 0
1,509 3,018 3,018
100.0 %
Total Revenues and Other Sources 646,347 654,763
6,197 657,781 3,018
0.5 %
Expenditures by Category
Transfers 200,000 200,000
0 200,000 0
0.0 Operations & Maintenance 312,080 472,000
87,230 472,000 0
0.0 %
Total Expenditures and Other Financing
Uses 512,080 672,000
87,230 672,000 0
0.0 %
Excess of Revenues Over (Under) Expenditures 134,267 (17,237) (81,033) (14,219) 3,018
-17.5
Fund Balance, Beginning of Year 257,367 391,634
391,634
Fund Balance, End of Year 391,634 374,397
377,415
Fund Description
Service Level B reflects the collection of benefit assessments charged to property owners. Service Level B includes only those
parcels within residential subdivisions that receive residential street lighting services. This service level includes operational,
administrative, maintenance and utility costs of residential street lights. Each year, $200,000 is transferred from this fund
to the
TCSD Service Level "B" Streetlight Replacement Fund (Fund 191) to accommodate these costs.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 194 - TCSD SERVICE LEVEL "D" REFUSE/RECYCLING FUND % Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised Requested
Current
Description
Actuals
Budget
12-31-2023
Budget Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Assessments
9,532,420
10,442,107
71,905
10,442,107 0
0.0 Recycling Program
28,008
5,000
0 5,000 0
0.0 Use of Money and Property
Investment Interest
22,609
3,000
2,103
7,207 4,207
140.2
Intergovernmental Revenues
Grants
159,957
0 0
0 0
0.0 Total Revenues and Other Sources
9,742,995
10,450,107
74,007
10,454,314 4,207
0.0 %
Expenditures by Category
Salaries & Benefits
78,663
79,985
36,785
79,985 0
0.0 Operations & Maintenance
9,363,712
10,559,761
62,861
10,559,761 0
0.0 Total Expenditures and Other Financing
Uses
9,442,375
10,639,746
99,645
10,639,746 0
0.0 %
Excess of Revenues Over (Under) Expenditures
300,620
(189,639)
(25,638)
(185,432) 4,207
-2.2 %
Fund Balance, Beginning of Year
279,743
580,363
580,363
Fund Balance, End of Year
580,363
390,724
394,931
Fund Description
Service Level D Fund is used to collect benefit assessments charged to property owners for the purpose of providing refuse collection, recycling, and street sweeping throughout
the City,
which is provided
by CR&R.
In addition, Service Level D has received
grants to increase recycling efforts Citywide.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 195 - TCSD SERVICE LEVEL "R" STREET/ROAD MAINT FUND Change
2023-24 Year to Date
2023-24 Q2
from
2022-23 Current Actuals
Revised Requested
Current
Description
Actuals Budget 12-31-2023
Budget Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Assessments
5,302 5,532 230
5,532 0
0.0 Use of Money and Property
Investment Interest
579 0 126
253 253
100.0
Total Revenues and Other Sources
5,881 5,532 356
5,785 253
4.6 Expenditures by Category
Operations & Maintenance
107 10,200 0
10,200 0
0.0 Total Expenditures and Other Financing
Uses
107 10,200 0
10,200 0
0.0 Excess of Revenues Over (Under) Expenditures
5,774 (4,668) 356
(4,415) 253
-5.4
Fund Balance, Beginning of Year
27,281 33,055
33,055
Fund Balance, End of Year
33,055 28,387
28,640
Fund Description
Service Level R Fund reflects the operational, administrative, construction and maintenance costs for certain unpaved roads that
become inaccessible after inclement weather. Zone
R-1 provides service in the Nicolas/Liefer Road area. The maximum rate that can be charged for Zone R-1 for an improved parcel is $115.26 and for an unimproved parcel is $57.62.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 196 - TCSD SERVICE LEVEL "L" LAKE PARK MAINT. FUND Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Assessments
251,292
254,208
0 254,208
0 0.0
Harveston Lake Boat Revenue
5,035
4,284
2,325
4,284
0 0.0
Use of Money and Property
Investment Interest
7,436
0 1,419
2,839
2,839
100.0
Other
0 0
176
176
176
100.0
Miscellaneous
Miscellaneous
27,930
30,000
2,318
4,635
(25,365)
-84.6
Total Revenues and Other Sources
291,693
288,492
6,237
266,142
(22,350)
-7.7
Expenditures by Category
Salaries & Benefits
12,863
13,805
6,229
13,805
0 0.0
Operations & Maintenance
295,365
275,200
190,203
275,200
0 0.0
Total Expenditures and Other Financing
Uses
308,228
289,005
196,432
289,005
0 0.0
Excess of Revenues Over (Under) Expenditures
(16,535)
(513)
(190,194)
(22,863)
(22,350)
4,356.9
Fund Balance, Beginning of Year
377,291
360,756
360,756
Fund Balance, End of Year
360,756
360,243
337,893
Fund Description
Service Level L Fund reflects the benefit assessments charged to property owners for the purpose of maintaining the Harveston Lake Park. Expenditures include operational, administrative and maintenance costs.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-24
Quarterly Budget Report
FUND: 197 - TEMECULA LIBRARY FUND
% Change
2023-24
Year to Date
2023-24 Q2
from
2022-23
Current
Actuals
Revised
Requested
Current
Description
Actuals
Budget
12-31-2023
Budget
Adjustments
Budget
Revenues by Source
Licenses, Permits and Service Charges
Printing & Copies
9,967
8,919
4,502
8,919
0 0.0
Fines and Forfeitures
Fines & Forfeitures
32,636
25,446
14,398
25,446
0 0.0
Use of Money and Property
Investment Interest
10,167
0 2,027
4,055
4,055
100.0
Lease/Rental Income
18,192
14,620
7,076
14,620
0 0.0 %
Reimbursements
Other Reimbursements
70 0
0 0
0 0.0
Operating Transfers In
Contribution From Measure S
975,563
891,364
0 818,085
(73,279)
-8.2 %
Total Revenues and Other Sources
1,046,594
940,349
28,003
871,125
(69,224)
-7.4 %
Expenditures by Category
Salaries & Benefits
209,877
225,739
101,549
225,739
0 0.0
Operations & Maintenance
498,265
618,866
225,438
621,366
2,500
0.4 %
Internal Service Fund Allocations
329,860
438,287
210,896
427,521
(10,766)
-2.5
Capital Outlay
30,829
0 0
0 0
0.0 Total Expenditures and Other Financing
Uses
1,068,832
1,282,892
537,883
1,274,626
(8,266)
-0.6 %
Excess of Revenues Over (Under) Expenditures
(22,238)
(342,543)
(509,880)
(403,501)
(60,958)
17.8 Fund Balance, Beginning of Year
525,740
503,501
503,501
Fund Balance, End of Year
503,501
160,958
100,000
Fund Description
The Library Fund is used to account for the maintenance and operations
of the Ronald H. Roberts Temecula Public Library on Pauba Road.
Alk
The Heart of Southern California
Wine Country
City of Temecula
Fiscal Year 2023-2024
Annual Operating Budget
Funds: 501-530 SERVICE LEVEL C - LANDSCAPE / SLOPE MAINTENANCE 2021-
2022-2023
2023-2024
2022
Current
Mid -Year
Increase/
Increase/
Description
Actuals
Budget
Budget
(Decrease)
Decrease
Revenues by Source
Licenses, Permits and Service Charges
ASSESSMENTS
1,590,183
1,588,829
1,590,481
1,652
0.1%
Use of Money and Property
INVESTMENT INTEREST
(15,323)
-
-
-
0.0%
Revenues/Other Sources
1,574,861
1,588,829
1,590,481
1,652
0.10/0
Expenditures by Category
SALARIES & BENEFITS
111,197
-
-
0.0%
OPERATIONS & MAINTENANCE
1,467,699
1,738,337
1,591,472
(146,864)
-8.4%
TRANSFERS
28,346
371,654
451,700
80,046
21.5%
Expenditures/Other Financing Uses
1,607,242
2,109,991
2,043,172
(66,818)
-3.2%
Net Revenues
(32,381)
(521,162)
(452,691)
68,471
-1.8%
Fund Balance, Beginning of Year
2,098,427
2,066,046
1,544,883
(521,162)
-25.2%
Fund Balance, End of Year
2,066,046
1,544,883
1,092,192
(452,691)
-29.3%
Fund Description
Service Level C Fund reflects the collection of benefit assessments charged to property owners for the purpose of providing perimeter landscaping and slope maintenance throughout the City. Service Level C assesses only those parcels within residential subdivisions receiving TCSD perimeter landscaping and slope maintenance and are separated into 32 zones. The rate levels for Zones 6 and 29, are subject to a Consumer Price Index -Urban Consumers (CPI-U) annual inflator while all other rate levels will not increase. Zones 30-32 will not be assessed, as the property owners have elected to have the landscaping maintained by the respective Homeowner's Associations (HOAs).
Analysis/Comments
Item No. 13
CITY OF TEMECULA
AGENDA REPORT
TO: City Council
FROM: Peter M. Thorson, City Attorney
DATE: February 27, 2024
SUBJECT: Approve Amendment No. 7 to City Manager Aaron Adams' Employment Agreement
RECOMMENDATION: That the City Council approve Amendment No. 7 to City Manager Aaron Adams' Employment Agreement.
DISCUSSION: On June 11, 2013 the City Council approved the Employment Agreement for Aaron Adams as the City Manager. The Employment Agreement was amended on February 14, 2017, July 1, 2017, June 11, 2019, May 10, 2022, December 13, 2022, and June 13, 2023.
Four changes are proposed for the City Manager's Employment Agreement by Amendment No. 7: 1) Provide a 4.4% cost of living salary adjustment effective July 1, 2024; 2) allow for future automatic cost of living adjustments without Council approval; 3) maintain the existing City contribution to the City Manager's deferred compensation plans, but change the specific plan to which the contribution is made and extend this through the end of the Agreement; and 4) extend the end date of the Agreement by 11 days to January 10, 2027 and allow the City Manager to resign during the period of December 20, 2026 to January 10, 2027 without the normal 60-day notice.
1) Cost of Living Adjustment Effective July 1, 2024.
Section 4.B of the Employment Agreement provides that each year on July 1 for the term of the Agreement the City Manager's annual base salary would be increased by the higher of:
1) A Cost of Living Adjustment not to exceed 3%, as defined; or 2) A compaction adjustment necessary to keep the annual base salary of the City Manager 10% higher than the top step of the base salary range of the City's next highest paid classification, subject to an amendment to the Agreement.
Section 4.B of the Employment Agreement also provides that any salary adjustment of more than a 3% cost of living increase or the salary compaction adjustment must be approved by the Council through an amendment to the Employment Agreement.
On February 27, 2024, the City Council will consider approving an 4.4% cost of living increase for all City employees effective July 1, 2024 as negotiated with Teamsters 911 in the current Memorandum of Understanding. Since this amount is more than the 3% increase described in Section 4.B.1), the Council will need to approve the 4.4% cost of living adjustment for the City Manager's salary.
2) Future Cost of Living Adjustments without Council Approval.
The proposed amendment to Section 4.13 would eliminate the 3% cap on automatic COLA increases without City Council action. Any salary adjustments to prevent compaction would still require Council approval. The COLA is the percentage change in the Annual Consumer Price Index for Urban and Clerical Workers (CPI-W) for all items in Riverside -San Bernardino -Ontario, CA as determined by the United States Department of Labor. The automatic COLA adjustments are formulas that are applied without any subjective determinations and are specifically authorized by Government Code Sections 3511.1 and 3511.2
3) Maintain Existing Deferred Compensation Contributions but Change the Account to which it is Made.
The City Manager's Employment Agreement includes a term providing for a City contribution to his deferred compensation plans. For city employees these are 401(a) and 457(b) deferred compensation established pursuant to the Federal tax laws. Proposed Amendment No. 7 would provide the City Manager with greater flexibility in allocating the City's deferred compensation contributions between his 457(b) Plan and 401(a) Plan and extend this to the end of the term of the Employment Agreement. The City's total contribution to the City Manager's deferred compensation plans will not change, but the allocation of the contribution between the plans would change. It would also confirm that the City Manager may contribute his unused accrued Comprehensive Annual Leave (CAL) time to his 401(a) Plan upon separation from City service. 4) Extend the Term of the Employment Agreement by 11 Days Given the complexities of the CalPERS statutes and regulations and the Federal Internal Revenue Code provisions and IRS regulations governing deferred compensation, the selection of an exact date for retirement is difficult, particularly at the end of a calendar year. Therefore, in order to provide the City Manager with more flexibility in his contract term to consider separation or extension, Amendment No. 7 would extend the termination date of his Employment Agreement by 11 days from December 30, 2026 to January 10, 2027. The City Manager would also have the option to resign at any time between December 20, 2026 and January 10, 2027 without the usual 60-notice. The Agreement provides that six months prior to the end of the Agreement, the City Council and City Manager will discuss whether he will retire or extend the Agreement so that the Council will have sufficient time to initiate a recruitment should the City Manage decide to retire.
FISCAL IMPACT: If the proposed Amendment No.7 is approved, the City Manager's salary will increase by 4.4% on July 1, 2024.
ATTACHMENTS:
1. Proposed Amendment No. 7 to Employment Agreement for Aaron Adams; and
2. Original Employment Agreement for Aaron Adams with Amendment Nos. 1 to 6
AMENDMENT NO.7 TO CITY MANAGER EMPLOYMENT AGREEMENT
BETWEEN CITY OF TEMECULA AND AARON ADAMS
This Amendment No. 7 to the Employment Agreement by and between the City of Temecula, a California municipal corporation ("City"), and Aaron Adams, an individual, ("Employee") is made and entered into as of February 27, 2024 ("Amendment No. 7"). In consideration of the mutual covenants contained herein the parties agree as follows:
1. Recitals.
A. The City and Employee previously entered into an Employment Agreement on June 1, 2013, as amended by Amendment No. 1, approved February 4, 2017, Amendment 2, approved May 9, 2017, Amendment No. 3, approved June 1, 2019, Amendment No. 4 approved May 10, 2022, Amendment No. 5, approved December 13, 2022, and Amendment No. 6 approved June 13, 2023 (collectively the "Agreement").
B. On February 27, 2024, the City Council approved a cost of living increase for all City employees of 4.4% effective July 1, 2024 as negotiated with Teamsters 911 in the current Memorandum of Understanding. Since this amount is more than the 3% cap on the cost of living increase described in existing Section 4.13.1) of the Agreement, the City and Employee desire to enter into this Amendment No. 7 approving the cost of living increase.
C. City and Employee desire to further amend the Agreement according to the terms of this Amendment No. 7, as provided below, in order to clarify the procedures for future Cost of Living Adjustments, deferred compensation, and the ending date of the term of the Agreement.
2. Salary. Section 4, Salary, of the Agreement, is amended to read as follows:
"A. "Except as otherwise expressly provided in the Agreement, effective July 1, 2024, Employee shall receive a base salary of three hundred forty eight thousand nine hundred fifty one dollars and fifty five cents ($348,951.55) and each July 1 thereafter, unless otherwise provided herein, Employee shall be entitled to the higher of either: 1) a cost of living adjustment ("COLA") in base salary as described in subsections B.1. and
13.2. or 2) an increase such that Employee's base salary as City Manager is at least ten percent (10%) higher than the top step of the base salary range of the City's next highest paid classification as described in subsection C.
"B. Cost of Living Adjustment
1. Effective the first pay period in Fiscal Year 2025-26, Employee shall be entitled to an automatic a cost of living adjustment (COLA) in base salary without further action of the City Council. The COLA shall be the percentage change in the Annual Consumer Price Index for Urban and Clerical Workers (CPI-W) for all items in Riverside -San Bernardino -Ontario, CA for the prior calendar year as compared to the Annual CPI-W of two calendar years prior. In the event the CPI-W is below 0%, the COLA shall be 0%. -1-
11086-0001 \2926991 v l . doc
2. Effective the first pay period in Fiscal Year 2026-27, Employee shall be entitled to a cost of living adjustment (COLA) in base salary without further action of the City Council. The COLA shall be the percentage change in the Annual Consumer Price Index for Urban and Clerical Workers (CPI-W) for all items in Riverside -San Bernardino -Ontario, CA for the prior calendar year as compared to the Annual CPI-W of two calendar years prior. In the event the CPI-W is below 0%, the COLA shall be 0%."
"C. Consistent with the City's Classification and Compensation plan, the Employee, as City Manager, shall be the highest paid employee of the City. The annual base salary of the City Manager shall never be less than ten percent (10%) higher than the top step of the base salary range of the City's next highest paid classification. Any change to the City Manager's salary in order to comply with this provision shall not be effective until adopted by the City Council during an open session of a duly noticed public meeting and included on a publically available pay schedule. Except as mutually agreed, such increase will be retroactive to the date of the increase for the next highest paid employee that required action under this Paragraph."
3. Deferred Compensation. Section 5.C(3) is hereby added to the Agreement to read as follows:
"(3). The contributions to the 457(b) Plan and the 401(a) Plan shall be implemented in accordance with the following:
"a) For each calendar year from 2024 through the last day of this Agreement, the City shall make contributions to the City Manager's account under the City's 401(a) Defined Contribution Plan ("401(a) Plan"), as follows:
1) The City's total 401(a) contribution for each calendar such year will equal the sum of (i) $10,000, plus (ii) the maximum contribution permitted under the tax laws to the City Manager's account under the City's 457(b) Defined Compensation Plan ("457(b) Plan") for the year, taking into account the "Age 50 Catch Up" provision and, if the year in question is one of the three calendar years preceding the "normal retirement age" designated by the City Manager under the 457(b) Plan, the "Special 3-Year Catch Up" provision.
2) The 401(a) contributions will be made, in pro rata amounts, as soon as administratively practicable after the last day of each payroll period during the calendar year.
3) Notwithstanding the foregoing, the contributions will cease upon City Manager's separation from City employment. Contributions for the final payroll period of the City manager's employment will be adjusted pro rata according to the separation date.
-2-
11086-0001 \2926991 v l . doc
"b) Upon separation, the City Manager's unused accrued Comprehensive Annual Leave (CAL) time will be contributed to his 401(a) Plan account, up to the maximum contribution permitted by the tax laws. Such 401(a) contribution will be determined and made after all 401(a) contributions required by subsection
5.C(3)a), above, have been deposited. The City Manager will then have the option of contributing any remaining CAL balance to the City Manager's 457(b) Plan account, up to the maximum contribution permitted by the tax law, or paid to the City Manager in cash less applicable tax withholdings."
4. Term of Agreement. Section 3.A of the Employment Agreement is hereby amended to read as follows
"A. The term of this Agreement is further extended to January 10, 2027, unless sooner terminated as provided in Paragraph 6 of this Agreement, provided however, that between December 20, 2026 and January 10, 2027 the Employee may resign at any time without the required 60 day prior notice as provided in Section 6.E of this Agreement."
5. No Other Changes. Except as expressly modified in this Amendment No. 7, all provisions of the Agreement, as previously amended, shall remain in full force and effect.
6. General.
A. Each party is entering into this Amendment No. 7 based solely upon the representations set forth herein and upon each party's own independent investigation of any and all facts such party deems material.
B. Employee acknowledges that he has had the opportunity and has conducted an independent review of the financial, tax and legal effects of this Amendment No. 7. Employee acknowledges that he has made an independent judgment upon the financial and legal effects of this Amendment No. 7 and has not relied upon any representation of City, its officers, agents or employees other than those expressly set forth in this Amendment No. 7. -3-
11086-0001 \2926991 v l . doc
IN WITNESS WHEREOF the parties have executed this Amendment No. 7 as of the date first written above.
CITY OF TEMECULA
James Stewart
Mayor
EMPLOYEE
Aaron Adams
ATTEST:
Randi Johl, JD, MMC
City Clerk
APPROVED AS TO FORM:
Peter M. Thorson
City attorney
In
11086-0001 \2926991 v l . doc
AMENDMENT NO.6 TO CITY MANAGER EMPLOYMENT AGREEMENT
BETWEEN CITY OF TEMECULA AND AARON ADAMS
This Amendment No. 6 to the Employment Agreement by and between the City of Temecula, a California municipal corporation ("City"), and Aaron Adams, an individual ("Employee") is made and entered into as of June 13, 2023. In consideration of the mutual covenants contained herein the parties agree as follows:
1. Recitals. Amendment No. 6 to the Agreement is made with respect to the following purposes and facts that each party acknowledges to be true and correct:
A. The City and Employee previously entered into an Employment Agreement on June 1, 2013, as amended by Amendment No. 1, approved February 4, 2017; Amendment No. 2, approved May 9, 2017; Amendment No. 3, approved June 1, 2019, Amendment No. 4 approved May 10, 2022, and Amendment No. 5, approved December 13, 2022 (collectively the "Agreement").
B. On June 13, 2023, the City Council approved a cost of living increase for all City employees of 8.7% effective July 1, 2023 as negotiated with Teamsters 911 in the current Memorandum of Understanding. Since this amount is more than the 3% cap on the cost of living increase described in Section 4.13.1) of the Agreement and a salary adjustment is necessary to maintain the 10% salary differential provided in Section 4.13.2) of the Agreement, the City and Employee desire to adopt this Amendment No. 6.
2. Salary, Paragraph A. of Section 4 (Salary), of the Agreement, is amended to read as follows:
"A. Except as otherwise expressly provided in the Agreement, effective July 1, 2023, Employee shall receive a base salary of three hundred thirty four thousand two hundred thirty seven dollars and seventy two cents ($334,237.72)."
3. No Other Chany-es. Except as expressly modified in this Amendment No. 6, all provisions of the Agreement, as previously amended, shall remain in full force and effect. se
11086-0001\2813250v l.doc
IN WITNESS WHEREOF the parties have executed this Amendment No. 6 as of the date first written above.
CITY OF TEMECULA
ZeLle 5WL,.,4
Zak Schwank
Mayor
ATT
Ran , JD, MMC
City Clerk
APPROVED AS TO FORM:
Peirer M. Thorson
City attorney
-2-
11086-0001 \2813250v Ldoc
AMENDMENT NO.5 TO CITY MANAGER EMPLOYMENT AGREEMENT
BETWEEN CITY OF TEMECULA AND AARON ADAMS
The Employment Agreement ("Agreement") by and between the City of Temecula, a California Municipal Corporation ("City" or "Employer"), and Aaron Adams, an individual ("Employee"), made and entered into as of June 1, 2013, as previously amended, is hereby further amended as provided in this Amendment No. 5. This Amendment No. 5 is effective December 13, 2022, except as otherwise indicated. In consideration of the mutual covenants hereinafter contained the parties agree as follows:
1. Recitals. This Agreement is made with respect to the following purposes and facts that each party acknowledges to be true and correct:
A. The Parties previously entered into the Agreement as of June 1, 2013, as amended by Amendment No. 1, approved February 4, 2017; Amendment 2, approved May 9, 2017; Amendment No. 3, approved June 1, 2019 and Amendment No. 4 dated May 10, 2022.
B. City and Employee desire to amend the Agreement according to the terms of this Amendment No. 5, as provided below.
2. Term. Section 3 (Term) Paragraph A and B of the Agreement are amended to read as follows:
"A. The term of this Agreement is further extended to December 30, 2026, unless sooner terminated as provided in Paragraph 6 of this Agreement." "B. The term of this Agreement may be extended by mutual agreement of the parties in a written amendment to this Agreement or by a new written agreement, duly adopted by the City Council. Provided this Agreement is still in force, the City Council shall advise Employee on or before June 30, 2026 if the City Council intends to negotiate an extension of this Agreement. Employee shall remind the City Council during the month of May 2026 of the requirement for an indication of its intent. Should the parties decide to negotiate an extension, neither party is required to reach agreement."
3. Termination and Resignation. Section 6 (Termination and Resignation), Paragraphs A and B, of the Agreement are amended to read as follows:
666. Termination and Resignation. Section 6 (Termination and Resignation) of the Agreement is amended to read as follows:
"A. Employee is an at -will employee serving at the pleasure of the City Council, subject to the terms of this Agreement. City Council may terminate this Agreement and the employment of Employee at any time without notice and with or without cause. Termination shall require the affirmative votes of three Council Members. 4-
12774-0001 \2750225v2.doc
"B. Severance Benefit
1. Termination. In the event Employee is terminated by the City Council by a unanimous vote, of the full City Council, City shall pay Employee a lump sum severance benefit equal to twelve (12) months of his then -monthly salary (salary as of the final day of employment), or such time as is remaining on the term of the Agreement, whichever is less, subject to the provisions of Section 6.C. of the Agreement. In the event Employee is terminated by the City Council without a unanimous vote of the full City Council, City shall pay Employee a lump sum severance benefit equal to eighteen (18) months of his then -monthly salary (salary as of the final day of employment), or such time as is remaining on the term of the Agreement, whichever is less, -subject to the provisions of Section 6.C. of the Agreement. City shall also provide to Employee, at no cost to Employee, health benefits provided by Paragraph 5.13. of this Agreement: (1) for the number of months of severance as described above, (2) until Employee finds other employment; or (3) until Employee files for retirement with Ca1PERS, whichever occurs first. Employee shall not be entitled to retirement or leave benefits during this period, or any other benefit not permitted by law. These severance benefits shall not apply if Employee voluntarily resigns or if this Agreement expires without a written amendment extending it.
2. InvoIgniga Resignation. Employee has relied upon the provisions of Government Code Sections 34851 to 34959 and Chapter 2.12 of the Temecula Municipal Code establishing the City Manager form of Government in entering into this Agreement, as it pertains to Employee's terms and conditions of employment, including but not limited to his role, powers, duties, authority, responsibilities, compensation and benefits.
In the event Chapter 2.12 or other provisions of the Municipal Code are amended without the consent of Employee, and such addition, deletion or amendment is inconsistent with the terms of this Agreement and Employee's terms and conditions of employment, including but not limited to his role, powers, duties, authority, responsibilities, compensation and benefits as currently provided, then Employee shall have the right, at Employee's sole option, to give the City Council notice that such amendment(s) constitute involuntary resignation and Employee shall be entitled to resign and City shall pay Employee a lump sum severance benefit equal to eighteen (18) months of his then -monthly salary (salary as of the final day of employment), or such time as is remaining on the term of the Agreement, whichever is less.
Upon receipt of such notice the City Council shall have thirty days in which to do one of the following: (a) rescind the amendment(s); (b) renegotiate this Agreement to Employee's satisfaction; or (c) take no action. In the event that either (c) occurs, or the City is unable to accomplish (b), then Employee shall be entitled to resign and still receive the severance benefits provided in this Section 6.13.
"C. City shall not be obligated to provide the severance benefits designated in Paragraph 6.13 in the event that: (1) Employee is terminated because of his conviction of a felony or the filing of a criminal charge against him alleging a felony which subsequently results in his conviction of a felony (including a plea of nolo contendre thereto); or (2) Employee has engaged in corrupt or willful misconduct in office, including any illegal act involving personal gain. In the event Employee is terminated by City following the filing of felony charge or charges, Employee shall be entitled to such severance benefits commencing at the time a final judgment is rendered N
12774-0001 \2750225v2.doc
or disposition of the charges is made establishing that Employee did not commit the acts for which he was charged unless it is otherwise established that Employee has engaged in corrupt or willful misconduct in office, including any illegal act involving personal gain.
"D. Upon termination, separation, or expiration of Employee's employment as City Manager, City shall pay to Employee the lump sum cash equivalent of all of the remaining leaves to which Employee is entitled under this Agreement. "E. Nothing in this Agreement shall prevent, limit or otherwise interfere with the right of Employee to resign at any time from his position with City, subject only to Employee providing sixty (60) days prior written notice to the City or such shorter period as approved in writing by the City Council.
"F. Notwithstanding the above, it is also understood and agreed that Employee shall be retained a minimum of six (6) months following the date of certification of any municipal election at which a new councilmember is elected to the Council, thereby allowing the new City Council adequate time to assess the Employee's performance. If Employee is terminated at the end of this six month period following such an election, the provisions of this Section shall apply to such action.
"G. Any other term of this Agreement notwithstanding, the maximum severance and health benefits that Employee may receive under this Agreement as a result of termination shall not exceed the limitations provided in Government Code §§ 53260-53264. Further, in the event Employee is convicted of a crime involving an abuse of office or position, Employee shall reimburse the City for any paid leave or cash settlement (including severance), as provided by Government Code Sections 53243 — 53243.4."
4. No Other Changes. Except as expressly modified in this Amendment No. 5, all provisions of the Agreement, as previously amended, shall remain in full force and effect. -3-
12774-0001\2750225v2.doc
IN WITNESS WHEREOF the parties have executed this Amendment No. 5 as of the date first written above.
CITY OF TEMECULA
Matt Rahn
Mayor
ATTW'Jo,
Ran�M�M-C
City Clerk
APPROVED AS TO FORM:
Peter M. Thorson
City attorney
-4-
12774-0001 \2750225v2.doc
AMENDMENT NO.4 TO CITY MANAGER EMPLOYMENT AGREEMENT
BETWEEN AARON ADAMS AND CITY OF TEMECULA
The Employment Agreement ("Agreement") by and between the City of Temecula, a California Municipal Corporation ("City" or "Employer"), and Aaron Adams, an individual ("Employee"), made and entered into as of June 1, 2013, as previously amended, is hereby further amended as provided in this Amendment No. 4. This Amendment No. 4 is effective May 10, 2022, except as otherwise indicated. In consideration of the mutual covenants hereinafter contained the parties agree as follows:
1. Recitals. This Agreement is made with respect to the following purposes and facts that each party acknowledges to be true and correct:
A. The Parties previously entered into the Agreement as of June 1, 2013, as amended by Amendment No. 1, approved February 4, 2017; Amendment 2, approved May 9, 2017; and Amendment No. 3, approved June 1, 2019.
B. Pursuant to its terms, the Agreement, as amended, expires June 30, 2024, provided it is not sooner terminated, as set forth in Amendment No. 3.
C. City and Employee desire to amend the Agreement according to the terms of this Amendment No. 4, as provided below.
2. Salary. Section 4 (Salary), as previously amended by Amendments No. 1, No. 2, and No. 3, is further amended to read as follows:
A. Paragraph A is amended to read: "Except as otherwise expressly provided in the Agreement or this amendment, effective July 1, 2021, Employee shall receive a 6% raise in salary, to $274,206."
B. Paragraph B is amended to read:
"Effective July 1, 2022, and each July 1 thereafter, unless otherwise provided herein, Employee shall be entitled to the higher of either: 1) a cost of living adjustment ("COLA") in base salary as described in subsection B. 1; or 2) an increase such that Employee's base salary as City Manager is at least 10% higher than the top step of the base salary range of the City's next highest paid classification as described in subsection
13.2. 1. The COLA shall be the lower of either the percentage change in the Annual Consumer Price Index (CPI) for Urban and Clerical Workers for Riverside -San Bernardino -Ontario, CA for the prior calendar year as compared to the Annual CPI of two calendar years prior, or 3%, but not less than 0%. For example, the July 1, 2022 COLA will be the percentage change between the 2021 Annual CPI and the 2020 Annual CPI, subject to a minimum of 0% and a maximum of 3%.
11086-0001\2644805v1.doc - 1 -
2. Consistent with the City's Classification and Compensation plan, the Employee, as City Manager, shall be the highest paid employee of the City.
The annual base salary of the City Manager shall never be less than 10% higher than the top step of the base salary range of the City's next highest paid classification. Any change to the City Manager's salary in order to comply with this provision shall not be effective until adopted by the City Council during an open session of a duly noticed public meeting and included on a publically available pay schedule. Except as mutually agreed, such increase will be retroactive to the date of the increase for the next highest paid employee that required action under this Paragraph."
3. The City and Employee shall revisit and review this Agreement prior to December 31, 2022.
4. Except as expressly modified in this Amendment No. 4, all provisions of the Agreement, as previously amended, shall remain in full force and effect.
IN WITNESS WHEREOF the parties have executed this Amendment No. 4.
CITY OF TEMECULA
Matt Rahn
Mavor
Aaron Adams
City Manager
ATTES
Randi , JD, MMC
City Clerk
APPROVED AS TO FORM:
Peter M. Thorson
City Attorney
11086-0001\2644805v1.doc - 2 -
AMENDMENT NO. 3 TO
CITY MANAGER EMPLOYMENT AGREEMENT BETWEEN
AARON ADAMS AND CITY OF TEMECULA
The Employment Agreement ("Agreement") by and between the City of Temecula, a California Municipal Corporation ("City" or "Employer"), and Aaron Adams, an individual, ("Employee"), made and entered into as of June 1, 2013, as previously amended, is hereby further amended as provided in this Amendment No. 3 ("Amendment No. 3"). This Amendment No. 3 is effective July 1, 2019, except as otherwise indicated. In consideration of the mutual covenants hereinafter contained the parties agree as follows:
1. Recitals. This Agreement is made with respect to the following purposes and facts that each party acknowledges to be true and correct:
A. The Parties previously entered into the Agreement as of June 1, 2013, as amended by Amendment No. 1, approved February 14, 2017, and Amendment No. 2, approved May 9, 2017.
B. Pursuant to its terms, the Agreement, as amended, expires June 30, 2021, provided it is not sooner terminated, as set forth in the Agreement.
C. The Parties desire to continue of their employment relationship beyond expiration of the Agreement and have negotiated, personally or by their representatives, terms for an extension of the Agreement.
D. City and Employee desire to extend and amend the Agreement according to the terms of this Amendment No. 3, as provided below.
2. Term. Section 3 (Term) Paragraph A and B of the Agreement are amended to read as follows:
A. "The term of this Agreement, originally set for June 1, 2013 to June 30, 2017 and subsequently extended to June 30, 2021 is further extended to June 30, 2024, unless sooner terminated as provided in Paragraph 6 of this Agreement." B. "The term of this Agreement may be extended by mutual agreement of the parties in a written amendment to this Agreement or by a new written agreement, duly adopted by the City Council. Provided this Agreement is still in force, the City Council shall advise Employee on or before December 31, 2023 if the City Council intends to negotiate an extension of this Agreement. Employee shall remind the City Council during the month of November 2023 of the requirement for an indication of its intent.
Should the parties decide to negotiate an extension, neither party is required to reach agreement."
3. Salary. Section 4 (Salary), paragraphs A and B of the Agreement, as previously amended by Amendments No. 1 and No. 2, are further amended to read as follows:
A. "Except as otherwise expressly provided in the Agreement or this Amendment, effective July 1, 2019, Employee shall receive a base salary of $245,863.00." -1-
B. "Effective July 1, 2020, 2021, 2022 and 2023 Employee shall be entitled to a cost of living adjustment in base salary. The COLA shall be the lower of either the percentage change in the Annual Consumer Price Index (CPI) for Urban and Clerical Workers for Riverside -San Bernardino -Ontario, CA for the prior calendar year as compared to the Annual CPI of two calendar years prior, or 3%, but not less than 0%.
For example, the July 1, 2020 COLA will be the percentage change between the 2019 Annual CPI and the 2018 Annual CPI, subject to a minimum of 0% and a maximum of 3%"
4. Deferred Compensation and Retirement. Section 5 (Hours of Work, Retirement, Insurance, Leaves and Holidays), paragraph C is amended as follows:
C. "(1) In addition to base salary and other benefits, City shall make an employer contribution as provided in the table below to an Internal Revenue Code section 457(b) plan maintained by City. Employer contributions will be prorated and paid each pay period and will also be prorated for partial years. Employee will not be eligible for employer contributions if he resigns or is terminated prior to the commencement of contributions, as listed below and Employee is not eligible for pro- rated contributions following termination."
Effective Date
Annual Employer
Paid
Contribution*
7/1/1.9 - 6/30/20
$19,000 or IRS
Prorated Each Pay Period
Maximum, if greater
7/l/20 - 6/30/21
$19,000 or IRS
Prorated Each Pay Period
Maximum, if greater
7/1/21 - 6/30/22
$19,000 or IRS
Prorated Each Pay Period
Maximum, if greater
7/l/22 - 6/30/23
$25,000 or IRS
Prorated Each Pay Period
Maximum, if greater
7/l/23 - 6/30/24
$25,000 or IRS
Prorated Each Pay Period
Maximum, if greater
*Contributions are subject to IRS and Internal Revenue Code limits and requirements. "(2) Employer shall establish a defined contribution Internal Revenue Code section 401(a) governmental profit sharing plan through either Nationwide Retirement Solutions or ICMA-RC or may establish a new group for Employee under an existing City 401(a) plan. In addition to base salary and other benefits, City shall make an employer contribution to the 401(a) plan as provided in the table below. Employer contributions will be prorated and paid each pay period and will also be prorated for partial years. If the plan is established after July 1, 2019,.the initial contribution may include the period from July 1, 2019 to the day of the first contribution, to the extent that contribution is permissible under the plan document and IRS limitations.
Employee will not be eligible for employer contributions if he resigns or is terminated -2-
prior to the commencement of contributions, as listed below and Employee is not eligible for pro -rated contributions following termination." Effective Date
Annual Employer
Contribution*
Paid
7/1/19 - 6/30/24
$10,000/year
Prorated Each Pay Period
*Contributions are subject to IRS and Internal Revenue Code limits and requirements.
5. Automobile Allowance. Effective July 1, 2019, the amount of the automobile allowance provided in Paragraph 8 (Automobile) of the Agreement is changed from $500 each month to $600 each month.
6. Except as expressly modified in this Amendment No. 3, all provisions of the Agreement, as previously amended, shall remain in full force and effect.
IN WITNESS WHEREOF the parties have executed this Amendment No. 3.
Att P___T
Ran i Johl,
City Clerk
Approved As to Form:
Peter M. Thorson
City Attorney
CITY OF TEMECULA
Michael S. Naggar
Mayor
Aaron Adams
-3-
AMENDMENT NO. 2 TO
CITY MANAGER EMPLOYMENT AGREEMENT BETWEEN
AARON ADAMS AND CITY OF TEMECULA
The Employment Agreement ("Agreement") by and between the City Of Temecula, a California Municipal Corporation ("City"), and Aaron Adams, an individual, ("Employee"), made and entered into as of June 1, 2013, as amended by Amendment No. 1, approved February 14, 2017, is hereby further amended as provided in this Amendment No. 2 ("Amendment No. 2"). This Amendment No. 2 is effective July 1, 2017. In consideration of the mutual covenants hereinafter contained the parties agree as follows:
1. Recitals. This Agreement is made with respect to the following purposes and facts that each party acknowledges to be true and correct:
A. The Parties previously entered into the Agreement as of June 1, 2013, and Amendment No. 1, approved February 14, 2017,
B. The City and its Management, Confidential and Executive Management Employees, pursuant to the Management Compensation Plan, have initiated a shift in the payment of a portion of the Public Employees' Retirement System (PERS) retirement contributions formerly paid by the City to covered employees implemented with an offsetting change in base salary.
C. The Parties desire to implement a similar 3% shift in retirement plan contributions from the City to Employee with a corresponding salary adjustment.
D. City and Employee desire to further amend the Agreement and Amendment No. 1 according to the terms of this Amendment No. 2, as provided below.
2. Salary. Section 4 (Salary), paragraph A of the Agreement, as amended by Amendment No. 1, is further amended to read as follows:
A. "Except as otherwise expressly provided in the Agreement or in Amendment No. 1, effective July 1, 2017 Employee shall receive a base salary of $231,750.00."
3. Retirement. Section 5 (Hours of Work, Retirement, Insurance, Leaves and Holidays), is amended by adding following sentences to the end of Paragraph B:
"Employee shall pay three percent (3%) of the PERS employer contribution beginning July 1, 2017. The City will pay the Member Contribution (EPMC), required by the Public Employees' Retirement System to maintain the current level of benefits and report the value of the Employer Paid Member Contribution as Special Compensation to PERS, The City will pay the cost of this Special Compensation benefit, the "PERS on PERS" cost, to the extent permitted by law. This provision shall not be effective
unless and until the City completes all applicable approvals and process required by law."
4. Healthcare Insurance. Pursuant to Paragraph 5.13, unless otherwise expressly provided in the Agreement, as amended, all changes in Executive Management Group healthcare benefits (including cafeteria and Health Flex contributions) are determined by the City Council to apply to Employee.
5. Unless otherwise indicated, this Amendment No. 2 is effective July 1, 2017.
Except as expressly modified in this Amendment No. 2, all provisions of the Agreement, as previously amended, shall remain in full force and effect.
IN WITNESS WHEREOF the parties have executed this Amendment No. 2.
CITY OF TEMECULA
Ma ann Ed ards
Ma or
EMPLOYEE
-aAL
Aaron Adams
Attest:
Rani ohl,
City Clerk
Approved As to Form:
Peter M. Thorson
City Attorney
AMENDMENT NO. 1 TO
CITY MANAGER EMPLOYMENT AGREEMENT BETWEEN
AARON ADAMS AND CITY OF TEMECULA
The Employment Agreement ("Agreement") by and between the CITY OF TEMECULA, a California Municipal Corporation ("City"), and Aaron Adams, an individual, ("Employee"), made and entered into as of June 1, 2013 is hereby amended as provided in this Amendment No. 1 ("Amendment"). This Amendment is effective July 1, 2017. In consideration of the mutual covenants hereinafter contained the parties agree as follows:
l . Recitals. This Agreement is made with respect to the following purposes and facts that each party acknowledges to be true and correct: