RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF THOUSAND OAKS CERTIFYING THE
FINAL ENVIRONMENTAL IMPACT REPORT AND
MITIGATION MONITORI NG AND REPORTING
PROGRAM, APPROVING A GENERAL PLAN
AMENDMENT TO CHA NGE THE LAND USE
DESIGNATIONS OF PROPER TY LOCATED AT 400
EAST ROLLING OAKS AND 355 WEST JANSS
ROAD, AND APPROVING A DEVELOPMENT
PERMIT, PARCEL MAP WAIVER, AND PROTECTED
TREE PERMIT FOR THE USE OF CERTAIN
PROPERTY WITHIN SAID CITY AT 400 EAST
ROLLING OAKS [APPLICA TIONS: 2022-70775-EIR,
2022-70587-LU, 2022-70733-Z, 2022-70732-DP,
2022-70736-PMW, 2022-70735- PTP; LOCATIONS:
400 EAST ROLLING OAKS, ASSESSOR’S PARCEL
NUMBERS: 681-0-180-265, 681-0-180-275 AND 355
WEST JANSS ROAD , ASSESSOR’S PARCEL
NUMBER (APN): 522-0-270-135; AND APPLICANTS:
HCA HEALTHCARE – LOS ROBLES HOSPITAL]
SECTION 1
The City Council of the City of Th ousand Oaks, California, DOES RESOLVE AS FOLLOWS:
WHEREAS, the applicant has filed wit h the City an application under the provisions of the City of Thousand Oaks Municipa l Code requesting the following:
1. Environmental Impact Repo rt (EIR) 2022-70775-EIR (State Clearinghouse Number 2023040287): Consider the Final Environmental Impact Report (EIR), including Mi tigation Monitoring and Reporting Program (MMRP) prepared in a ccordance with the California Environmental Quality Act (CEQA) for the subject project.
2. General Plan Amendment (GPA) 2022-70587-LU: To change the General Plan Land Use Designation from Neighborhood Very Low to Commercial Neighborhood for the property at 400 East Rolling Oaks Drive (APNs 681-0-180- 265 and 681-0-180-275) to accommodate the commercial Cancer Center medical office building and change the Land Use Designation from Institutional to Neighborhood Low 1 (˃2-4.5 units ATTACHMENT #2
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
per acre) for the property at 355 West Janss Road (APN 522-0-270- 135).
3. Zone Change (Z) 2022-70733-Z: To allow a Zone Change from Rural Exclusive, 1 acre minimum (R-E) to Commercial Office/Height Overlay (C-O/C-O-H) with the Height Overlay, limited to the building footprint and at the finished floor levels as indica ted in the plan materials, to allow a building to be up to 44-feet 2-inches tall for the property at 400 East Rolling Oaks Drive to accommodate t he Cancer Center medical office building at a maximum building height of 44-feet 2-inches and change the zoning from Public, Quasi- Public, and Institutional Lands and Facilities Zone (P-L) to Residentia l Planned development-4.5 dwelling units per acre (RPD-4.5U) for the property at 355 West Janss Road.
4. Development Permit (D P) 2022-70732-DP: To allow the demolition of all improvements on the pr operty and construction of an approximately 58,412 square foot (sf) medical o ffice building that accommodates various cancer medical and patient services. The building height would range between 27 feet and 44 feet 2 inches at its highest point. Primary access would be off Rolling Oaks Dr ive and secondary access off Los Padres Drive with open and covered par king provided on the property.
The project also includes the installation of hardscape, landscape, utilities, retaining walls, and associated grading on slopes steeper than 25 percent.
5. Parcel Map Waiver (PMW) 20 22-70736-PMW: To merge two lots, commonly referred to as APNs 681-0-180-265 and 681-0-180-275, into one legal lot of record.
6. Protected Tree Permit (PTP) 2022-70735- PTP: To allow removal of 14 protected oak trees consisti ng of 11 coast live oak ( Quercus agrifolia) trees, two holly oak ( Quercus ilex) trees, and one valley oak ( Quercus lobata) tree, and to plant replacement tree s at a 3:1 ratio resulting in a total of 42 oak trees consisting of 26 24-inch box size and 16 36-inch box size oak trees being planted on si te. Additionally, this PTP would allow encroachment within the protected zone of seven protected trees consisting of five coast live oak (Quercus agrifolia) trees, one valley oak (Quercus lobata) trees, and one toyon (Heteromeles arbutifolia).
WHEREAS, on April 21, 2022, a Notice of Application was posted on the subject property and mailed to all property owners within a 500-foot radius of the subject property;
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
WHEREAS, on October 26, 2023, an upda ted Notice of Application was posted on the subject property and mailed to all property owners within a 500-foot radius of the subject property;
WHEREAS, on February 26, 2024, No tice of Planning Commission (Commission) Public Hearing was publish ed in the “VC Star,” a newspaper of general circulation within the City of Thousand Oaks and was mailed to all property owners within a 500-foot radius of the subject property;
WHEREAS, on February 26, 2024, a Notice of Hearing sign was posted on the subject property; and
WHEREAS, the Commission, upon giving the required notice, did, on the 11 th day of March, 2024, conduct a duly-adv ertised public hearing as prescribed by law to consider said application; and
WHEREAS, at the March 11, 2024, Commission public hearing, oral and written evidence, including a staff r eport, were presented and received, and comments and arguments were heard from all interested parties appearing in the matter.
WHEREAS, on March 12, 2024, a Notice of Hearing sign was posted on the subject property; and
WHEREAS, on March 12, 2024, Notice of City Council Public Hearing was mailed to all property owners of record within a 500- foot radius of the subject site; and
WHEREAS, on March 15, 2024, Notice of City Council Public Hearing was published in the “Acorn,” a newspaper of general circulation within the City of Thousand Oaks; and
WHEREAS, the City Council, upon giving the required notice, did, on the 26th day of March 2024, conduct a duly advertised public hearing as prescribed by state law to consider said application; and
WHEREAS, at the March 26, 2024, Cit y Council public hearing, oral and written evidence, including a staff r eport, were presented and received, and comments and arguments were heard from all interested parties appearing in the matter.
SECTION 2
WHEREAS, pursuant to CEQA, City conducted environmental review of the project (consisting of a 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
70732-DP/2022-70736-PMW/2022-70735-PTP/LPC-2023-70008), prepared and duly processed an EIR (“Los Robles Comprehensive Cancer Center and the 355 West Janss Road General Plan Amendment and Zone Change Project” EIR), consisting of a Draft EIR dated December 2024 and a Final EIR dated March 2024, and prepared an MMRP for implementation of mitigation measures specified in the EIR; and
WHEREAS, pursuant to CEQA (Public Res. Code, Section 21000 et seq.), the State CEQA Guideline (14 CCR Sect ion 15000 et seq.) and the City of Thousand Oaks’ Local CEQA Guidelines, the City of Thousand Oaks (City) is the lead agency for the Project, as the public agency with general governmental powers; and
WHEREAS, the City, as the lead agency, determined that an EIR would be prepared pursuant to CEQA to analyze all potential adverse environmental impacts of the Project; and
WHEREAS, the City issued a Notice of Preparation (NOP) of a Draft EIR on April 11, 2023, and circul ated the NOP for a period of 30 days (between April 11 and May 11, 2023), pursuant to State CE QA Guidelines Sections 15082(a), 15103 and 15375; and
WHEREAS, pursuant to State CEQA Guidelines section 15082, the City solicited comments from pot ential responsible agencies, including details about the scope and content of the environmental information related to the responsible agencies area of statutory res ponsibility, as well as th e significant environmental issues, reasonable alternatives and mitiga tion measures that the responsible agency would have analyzed in the Draft EIR; and
WHEREAS, a public scoping meeti ng was held on May 2, 2023, to familiarize the public with the Project and the environmental review process and receive input as to the scope of the Dra ft EIR and issues of community concern; and
WHEREAS, 23 written statements were received by the City in the response to the NOP consisting of six agency lett ers, seven writt en statements were received by private organizations and members of the public, and an additional ten written statements or verbal comments were received at the scoping meeting by members of the public, which assisted the City in narrowing the issues and alternatives for analysis in the Draft EIR; and
WHEREAS, the Draft EIR was completed and released for public review on December 22, 2023 and City initiated a 45-day public comment period (between December 22, 2023, and Februar y 5, 2024) by filing a Notice of Completion and Availability; and
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
WHEREAS, pursuant to Public Re sources Code section 21092, the City also provided a Notice of Completion (NOC) and Notice of Availability (NOA) to all organizations and individuals who had pr eviously requested such notice and published the NOC on December 22, 2023, in a newspaper of general circulation in the Project area. Pursuant to the City of Thousand Oaks Local CEQA Guidelines, the NOA was mailed to all re sidents and property owners lying within 500 feet of the Project. The Draft EI R was posted on the City’s website, public counter and public libraries; and
WHEREAS, 25 written statements were received by the City in response to the NOC and NOA during the 45-day publ ic comment period consisting of one agency letter and 24 written statements by private organizations and members of the public; and
WHEREAS, the City prepared written response to comments following the closure of the public comment period for all comments received on the Draft EIR during the comment period, the City’s wr itten responses to the significant environmental points raised in those co mments were added to the Draft EIR to produce the Final EIR, and
WHEREAS, prior to taki ng action, the Commission and City Council have heard, been presented with, reviewed and cons idered all of the information and data in the administrative record, includi ng Final EIR, and all oral and written evidence presented to it during all the meetings and public hearing; and
WHEREAS, the Final EIR reflects the independent judgment of the City and is deemed adequate for purposes of making decisions on the merits of the Project; and
WHEREAS, all other legal prerequisite s to the adoption of this Resolution have occurred; and
WHEREAS, the City Council supports adoption and certification of said 2022-70775-EIR, and makes the following fi ndings of fact and recommends the following to City Council:
1. 2022-70775-EIR was prepar ed in accordance with the requirements of CEQA, includes all comments received on the Draft EI R and the City’s response thereto, reflects the independent judgement of the City of Thousand Oaks, and has been reviewed and considered by the City Council prior to making its decision.
2. Changes or alterations have been in corporated into the project through design or conditions that reduce potentially signific ant environmental impacts to a less than significant level, as identified in the Final EIR.
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
3. The Final EIR (2022- 70775-EIR) conducted an environmental analysis for each of the environmental factors out lined in Appendix G of the CEQA Guidelines, Environmental Check list Form and identified the following environmental factors as:
a. No significant impacts: Agricult ure and Forestry Resources; Geology and Soils; Hydrology and Water Qua lity; Mineral Resources; and Population and Housing.
b. Less than significant impacts: Ae sthetics; Air Quality; Energy; Greenhouse Gas Emissions; Land Use and Planning; Public Services and Recreation; Transpor tation; and Utilities and Service Systems.
c. Potentially significant impacts without mitigation but less than significant with mitigation incor porated: Biological Resources; Cultural, Tribal and Historical Resources; Geology and Soils (Paleontological Resources); Ha zards and Hazardous Materials; Noise; and Wildfire.
Mitigation Measures have been imposed upon the project which will feasibly reduce or eliminate any potential adverse effects to less than significant levels. Based on Final EIR, the Mi tigation Monitori ng and Reporting Program (MMRP) and any comments receiv ed, it is found that, there is no substantial evidence that the project will have a significant effect on the environment.
4. A MMRP has been prepared for the projec t associated with this application and is incorporated herein by re ference. The MMRP designates responsibility and anticipated timing fo r the implementation of mitigation measures imposed as conditions of approval which are fully enforceable through fees, permit conditions, agreements or other measures. The MMRP, incorporated by reference, describes the mitigation measures recommended by the EIR to reduce and avoid potential significant effects of the project, and adequately identif ies the appropriate timing and enforcement details for each to ens ure each mitigation measure is implemented.
5. 2022-70775-EIR has been reviewed for c onformance with the provisions of the CEQA. For this application, the City is the Lead Agency and, on behalf of the Applicant, the City Council is being asked to (a) adopt and make the CEQA Findings and certify the EIR as legally adequate under CEQA as to each development application associated with the project and (b) adopt the MMRP and incorporate its provisions as conditions of approval for project to the extent appropriate.
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
6. The City Council has reviewed and considered the information contained in the project Final EIR, and wri tten and oral comments regarding environmental effects. The project EIR was prepared in accordance with the requirements of CEQA, includes all comments received on the EIR and the City’s response thereto, reflects t he independent judgment of the City of Thousand Oaks. Each of the followin g findings is supported by and elaborated in the CEQA Findings of Fact found in the Final EIR.
7. Based on all written and oral evidenc e and testimony in the record, the project Final EIR (a) complies wit h the requirements of CEQA and adequately identifies and considers all pot ential significant environmental effects of the General Plan Am endment, Zone Change; Development Permit; Parcel Map Waiver; and Protected Tree Permit, and (b) reflects the City’s independent judgment and analysis.
8. The City Council adopts and makes the CEQA Findings and certifies the Final EIR as legally adequate under CEQA as to each development application associated with the project and adopts the MMRP and incorporates its provisi ons as conditions of approval for each of the development applications associated with the project to the extent appropriate.
SECTION 3
WHEREAS, the City Council of the City of Thousand Oaks has given notice thereof as required by law, held a public hearing on the General Plan Amendment No. 2022-70587-LU, to change the land use des ignations as described above in Section 1; and
WHEREAS, the City Council has ca refully considered all pertinent testimony and the staff repor t offered in the case as presented at the public hearing; and
WHEREAS, the findings of the City Council supporting approval of General Plan Amendment 2022-70587-LU as shown in Exhibit "A" and Exhibit “B” are as follows:
1. A proposed amendment to an element of the General Plan may be initiated in the following manner only: (a) By the adoption of a resolution of the Planning Commission setting the matter for study and hearing; or (b) By the adoption of a resolution of the Council requesting the Planning Commission to set the matter for hearing, report, and recommendation:
(1) Upon its own motion; or (2) Upon the acceptance of a petition filed pursuant to the provisions of Article 3 of this chapter. In all cases where
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
an amendment to the General Plan is initiated, the Council or Planning Commission shall designate the area and/or subjects to be studied. (TOMC Section 9-2.202).
On July 5, 2022, the City Council in itiated a General Plan Amendment through the adoption of Council Resolu tion No. 2022-040, and the City Council authorized the concurrent processing of entitlement applications for the project requiring the Commission to make a recommendation to Council for the whole of the entitlement request.
2. When the city or county has a pl anning commission authorized by local ordinance or resolution to review and recommend action on a proposed general plan or proposed amendment s to the general plan, the commission shall hold at least one public hearing before approving a recommendation on the adoption or amendment of a general plan. (California Government Code Section 65353) The planning commission shall make a written recommendation on the adoption or amendment of a general plan. Code Section 65354).
On March 11, 2024, the Commission held a public hearing to consider the requested General Plan Amend ment and associated ent itlement applications, where the Commission adopted Resolu tion No. 05-2024 PC recommending approval of the General Plan Amendment and concurrent entitlement applications, pursuant to the following findings:
The City Council considered the range of competing interest s within the 2045 General Plan, and the Cit y Council found the Gener al Plan Amendment is consistent with the intent of the 2045 General Plan. The General Plan Amendment changes the General Plan Land Use Designation from Neighborhood Very Low to Commercial Neighborhood for the property at 400 East Rolling Oaks Drive (APNs 681-0-180-265 and 681-0-180-275) to accomm odate the proposed commercial Cancer Center medical office building and changes the Land Use Designation from Institutional to Neighborhood Low 1 (˃2-4.5 units per acre) for the property at 355 West Janss Road which is necessary to sa tisfy the “no net loss” rule established by Senate Bill (SB) 330. The land use des ignations of the subject properties are compatible with and do not frustrate, the 2045 General Plan's goals and policies, as described in the findings below.
400 East Rolling Oaks Drive
The land use designation will be chang ed from Neighborhood Very Low to Commercial Neighborhood for the property . The Commercial Neighborhood land use designation will be consistent with the existing land uses in the near vicinity of 400 East Rolling Oaks. Properties to the north and northwest of 400 East Rolling Oaks Drive are already designated as Commercial Neighborhood, and these
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
properties already abut or are adjacent to properties with land use designations of Commercial Neighborhood, Neighborhood Rural, Neighborhood Very Low, Neighborhood High, and Parks, Golf Courses, and Open Space. These land uses have been found to be compat ible with one another in terms of both physical development standards and allowed uses.
355 West Janss Road
The land use designation will be changed from Institutional to Neighborhood Low 1 for the property. The Neighborhood Low 1 land use designation will be consistent with the existing land uses in the near vicinity of 355 West Janss Road. Los Robles Hospital is located at 215 West Janss Road, and that property has an existing Institutional land use designation and immediately abuts pr operties with land use designations of Neighborhood Low 1 (north and east), Commercial Neighborhood (west), and is adjacent to properties with a Neighborhood Rural land use designation (south). Properties with the Neighborhood Low 1 land use designation in the area (north and west) abut or are adjacent to properties with a Parks, Golf Courses, and Open Space land use des ignation. These land uses have been found to be compatible with one another in terms of both physical development standards and allowed uses.
The project was reviewed for its consistency with the 2045 General Plan as part of the EIR process. Specifical ly, three tables specify how the project is consistent with General Plan Goals and Policies:
1. EIR Table 4.1-1 “Project consis tency With Scenic Quality Policies and Zoning” (Section 4.1, Pages 4.1-11 through 4.1-25), and
2. EIR Table 4.8-1 “Project Cons istency with General Plan – Cancer Center Site” (Section 4.8-1, Pages 4.8-6 through 4.8-8), and
3. EIR Table 4.8-2 “Project Cons istency with Gener al Plan – Janss Road Site” (Section 4.8-1, Pages 4.8-9 through 4.8-10)
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
City of Thousand Oaks General Plan
Conservation Element
Goal C-2: Minimize and mitigate the visual effects of new urban development on hillsides.
Policy -2.1. Hillside areas. Employ site and architectural design techniques to blend development into the hillside terrain.
Cancer Center Component:
Consistent. The Cancer Center site
is located adjacent to existing
development to the north, west,
and east, and a knoll to the south.
As indicated in Figures 3-6a and 3-
6b, the proposed medical facility
would be similar in scale and style
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
to the existing medical complex
located to north. The building
would take advantage of the
existing changes in topography on
the Cancer Center site and would
reduce apparent scale by notching
into the existing slope/grade.
Additionally, the site will provide 14
percent landscape coverage,
providing enhanced perimeter
landscape treatment and
setbacks, and partial screening of
the proposed building from U.S.
101. The scale, building materials,
and colors reflected in the building
design would be visually
compatible with adjacent medical
center development to the north
and as a result, would create a
harmonious visual scene.
Janss Road Component:
Consistent. There is no proposed
development at the Janss Road
site at this time. Future
development at the site would
require review for consistency with
this policy at the time a
development application is
submitted.
Policy 2.2. Slope development. Limit development on
steep slopes (25% and over) and ridgelines.
Cancer Center Component:
Consistent. Portions of the Cancer
Center site contain slopes with a
25% natural grade of greater.
Slopes on the Cancer Center site
greater than 25% are limited to the
southern portion of the Cancer
Center site behind the proposed
Cancer Center building and along
the eastern boundary of the
Cancer Center site.
While the Cancer Center
component would include grading
on slopes that are over 25%
natural grade, and the
development of the site would
include construction of a tiered
retaining wall along the southern
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
boundary (and segments of the
eastern and western boundary). As
shown in Figure 4.1-6, views of the
graded area tiered retaining walls
from Rolling Oaks Drive would be
partially obstructed by the Cancer
Center building and landscaping.
Additionally, views would be brief
as pedestrians and motorists travel
along Rolling Oaks Drive and views
of the retaining walls and altered
slopes would be limited and would
not result in a substantial effect to
existing scenic quality. The Cancer
Center does not propose
manufactured slopes nor fill that
would exceed 25 feet.
Janss Road Component:
Not applicable. The Janss Road
site does not contain slopes with a
25% natural grade or greater.
Policy 4-1. Protected tree preservation. Continue to
implement the City’s Oak Tree and Landmark Tree
Ordinances per the municipal code and the Oak Tree
Preservation and Protection Guidelines.
Cancer Center Component:
Consistent. As described in Section
4.3, implementation of the Cancer
Center component would include
the removal of 14 protected trees,
and planting of 42 mitigation oak
trees. The Applicant would be
required to obtain a City of
Thousand Oaks Protected Tree
Permit as part of the Project and
mitigate impacts per MM-BIO-9,
which would include the
replacement of trees at a 3:1 ratio.
The Cancer Center site does not
contain any Valley Oak habitat on
site.
Janss Road Component:
Consistent. It is reasonably
foreseeable that future
development at Janss Road site
could result in removal of some of
the protected oaks on site.
However, review of plans for future
development at the site will be
required by the City and the project
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
applicant would be required to
obtain a City of Thousand Oaks
Oak/Landmark Tree Permit prior to
construction and mitigate impacts
per MM-BIO-9. The Janss Road site
does not contain Valley Oak
habitat.
Policy 9.1. Wetlands and riparian habitat. Preserve
wetlands and riparian habitat by maintaining existing
wetland and riparian buffers as open space to protect
the community’s water quality, biodiversity, and aesthetic value.
Cancer Center Component:
Consistent. The Cancer Center
development would avoid direct
impacts to wetlands adjacent to
the Cancer Center site. Indirect
impacts would not occur due to
compliance with the applicable
regulations. See Section 4.3,
Biological Resources for more
details.
Janss Road Component:
Not applicable. The Janss Road
site is currently a parking lot. No
wetlands are present currently.
Land Use Element
Policy 10.1. Public view corridors. Reaffirm and update adopted view sheds protection within the Ridgeline
Study. Promote development practices that enhance and
frame views of the mountains and ridgelines from view
corridors along public rights of ways
Cancer Center Component:
Consistent. The Cancer Center site
is located adjacent to existing
development to the north and east,
and a knoll to the south. The
proposed medical facility would be
similar in scale and style to the
existing medical complex located
to north.
Additionally, as described above in
Threshold A, the Cancer Center
Component would not be
constructed within existing open
space or substantially alter scenic
resources near the Cancer Center
site.
Janss Road Component:
Consistent. The Janss Road site is
currently developed as a parking
lot. No development at the site is
proposed at this time.
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
As described above in Threshold A,
the site is not located within
existing open space and would not
alter scenic resources near the
site.
Freeway Corridor Design Guidelines
Section A- Site Planning
(1) Buildings should be located on relatively level land between knolls or on moderate slopes They should not
be placed on ridgelines conspicuous hilltops or steep
hillsides where potential silhouetting and extensive
grading impacts could result. The plotting of any
structures shall consider adequate backdrop to blend
into the natural surroundings with a minimum of visual
impact
Cancer Center Component:
Consistent. The Cancer Center is
positioned on site to utilize the
existing developed portion of the
site that was previously graded and
developed. Grading of steep
hillsides for the Cancer Component
would be primarily located in the
southern portion of the site, away
from U.S. 101.
Further, as shown in Figure 4.1-4,
views of the proposed building
would be partially obstructed by
the existing trees on site and
intervening topography. Views of
grading impacts would be
obstructed from view of users of
U.S. 101.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(2) Building footprints shall reflect an integration of design that joins the buildings with the natural terrain Extensive grading shall be avoided The site topography
shall determine the form of architectural design
Cancer Center Component:
Consistent. The Cancer Center
building would be centered on a
previously graded portion of the
site. The building would take
advantage of the existing changes
in topography on the Cancer
Center site and reduce apparent
scale by notching into the existing
slope/grade.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
(3) All structures shall avoid large straight blank facades visual interest in design shall be provided by stepping the buildings back and creating more open space between
the buildings and the roadway in both horizontal and
vertical directions
Cancer Center Component:
Consistent. The Cancer Center
façade would include multiple
projections, planes, and features
(e.g., windows, decorative
ironwork, beams) that would break
up the massing of the structure
and add visual interest/avoid a
monotonous visual experience. In
addition, the building design
incorporates a “porte-cochere”
along its northern façade that
creates the illusion of a greater
setback from Rolling Oaks Drive.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(4) Building setbacks from the freeways and open spaces between buildings adjacent to the freeways shall be
increased to allow for landscaping and reduced visual
impact Distances shall be determined by viewshed site
topography and configuration and architectural design of the proposed buildings.
Cancer Center Component:
Consistent. The Cancer Center
Component would provide a 20-
foot front setback from property
line to building along Rolling Oaks
Drive, a 20-foot side setback from
Los Padres Drive, and a 20-foot
side setback from the property line
along the east edge of the
property. Additionally, the Cancer
Center Component would provide
14 percent landscape coverage
(approximately 17,000 SF) (as
shown in Figure 3-7a and 7b),
providing enhanced perimeter
landscape treatment, further
softening the visual impact of the
Cancer Center component.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(5) Buildings shall be oriented at angles to the freeways to reduce the exposed facades visible from the roadway
This shall also provide additional open space for
innovative landscape designs and open up views to
distant features
Cancer Center Component:
Consistent. As shown in Figure 4.1-
4, views of the proposed building
would be partially obstructed by
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
the existing trees on site and
intervening topography. The
Cancer Center component would
also provide enhanced perimeter
landscape treatment as shown in
Figure 3-7a and 7b of this EIR.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(6) Vehicle parking lots within the freeway view corridors shall be screened by utilizing combinations of earthen
berms landscaping predominantly evergreen and
innovative decorative wall designs to reduce the visual impact of rows of glittering automobiles Building
placement can also serve as a method of screening
parking lots
Cancer Center Component:
Consistent. The Cancer Center
would include vehicle parking
surrounding the Cancer Center
building. As shown in Figure 4.1-4,
views of the proposed parking lot
would be disrupted by the existing
trees on site and intervening
topography. Existing trees on site
bordering the parking lot along the
northern boundary of the Cancer
Center site and the northeastern
corner would remain on site.
Additionally, the project would
plant additional trees, shrubs, and
boulders to reduce views of
vehicles within the project parking
lot from the roadway.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(7) Exterior lighting fixtures shall be designed and placed in such a manner as to prevent spillage of illumination beyond the boundaries of the project site
Cancer Center Component:
Consistent. Please refer to analysis
under Threshold D.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
Section B- Architectural Design
(1) Building architecture shall make creative and
innovative statements yet not appear as an imposition
on the landscape Buildings must be designed at a scale
Cancer Center Component:
Consistent. The Cancer Center site
is located adjacent to existing
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
and manner that is sensitive to the terrain reflecting an integration of architecture and topography
development to the north, west,
and east, and a knoll to the south.
The proposed medical facility
would be similar in scale and style
to the existing medical complex
located to north. The building
would take advantage of the
existing changes in topography on
the Cancer Center site and reduces
apparent scale by notching into the
existing slope/grade on the Cancer
Center site. Additionally, as shown
in Figures 3-7a and 7b, the site will
provide 14 percent landscape
coverage, providing enhanced
perimeter landscape treatment
and setbacks. The project would
include a 20-foot side and front
setback from property line to
building along Rolling Oaks Drive
and Los Padres Drive. The
proposed Project also
accommodates a 20-foot side
setback and a 25-foot utility
easement from the property line
along the east edge of the
property. Further, as shown in
Figure 4.1-4, views of the proposed
building would be partially
disrupted by the existing trees on
site and intervening topography.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(2) Building architecture shall incorporate the use of
design articulation to break up building mass into
smaller components The use of angled building corners
sloping facades projecting and recessing of walls
opening sections of the buildings and the integration of landscape elements will help to reduce a bulky
appearance
Cancer Center Component:
Consistent. Please refer to
guideline A(3) above. As shown in
Figure 4.1-4, views of the proposed
building would be partially disrupted
by the existing trees on site and
intervening topography and views
from U.S. 101 would be limited to
the clay roof tiles and small portion
of the building’s façade.
Janss Road Component:
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(3) Proper siting of buildings allowing open sections
within buildings or among groups of buildings shall
provide some form of visual relief and maintain views of distant features
Cancer Center Component:
Consistent. As shown in Figure 4.1-
4, views of the proposed building
would be partially disrupted by the
existing trees on site and
intervening topography and views
from U.S. 101 of the Cancer Center
would be limited. The Cancer
Center site would include a parking
lot along the northern border of the
project boundary which would
provide additional distance
between U.S. 101 and the Cancer
Center building. Further the Cancer
Center component would include
landscaping along the northern
boundary.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(4) Building roof architecture shall be designed in a
manner that is sensitive to both building and terrain
Exposure of large expansive roof areas shall be avoided Cancer Center Component:
Consistent. The Cancer Center
building would have mansard
roofing broken up with canopy
roofs which would provide variation
in the roofline. As shown in Figure
4.1-4, views of the proposed
building would be limited to the
roofing and a small portion of the
building’s façade due to existing
trees on site and intervening
topography. Further, the building
would take advantage of the
existing changes in topography on
the Cancer Center site and reduces
apparent scale by notching into the
existing slope/grade.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
(5) Roof designs shall maintain a proportional
relationship to the scale and shape of the building walls Sloped roofs are encouraged and will depend upon the
site topography to avoid creating an imposing structure The use of roof overhangs in proportion to wall heights is encouraged to integrate the building with the terrain by providing a lower perceived horizontal structure Such
designs are necessary to achieve greater effective
shadow treatment to enhance the building architectural
facade and provide a perceived
Cancer Center Component:
Consistent. Please refer to
guideline B (4).
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(6) Exposure of roof mounted mechanical equipment will
not be permitted. Protective screening shall be
integrated into the building’s overall design of wall and roof components.
Cancer Center Component:
Consistent. Mechanical equipment
on the roof would be screened by
the varying roofline and mansard
roofing.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(7) Upper floor levels on multi-story buildings should be stepped back from their base to open up the view
corridor both horizontally and vertically.
Cancer Center Component:
Consistent. As described above,
the building would take advantage
of the existing changes in
topography on the Cancer Center
site and reduces apparent scale by
notching into the existing
slope/grade.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(8) The roofs of buildings which are constructed on land sloping up or down from the freeway shall be parallel to the natural topography in order to protect the line-of-sight within the view corridor. Projecting elements above roof lines shall be minimized and shall be integrated into the building’s overall design.
Cancer Center Component:
Consistent. Please see Guideline
A(2) and B(4).
Janss Road Component:
Not applicable. Janss Road
Component is not located within
Freeway Design Corridor.
(9) Selective use of taller buildings (height overlays) will be considered only where there is sufficient visual
backdrop and where important open views are not
blocked.
Cancer Center Component:
Consistent. As concluded below,
inconsistency with height
regulations within the C-O zone
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
would be assessed by the Planning
Commission prior to approval of
the proposed height to ensure the
Cancer Center is harmonious with
the purpose of the C-O and
compatible with surrounding
development. Further, as
concluded under Threshold A, the
Cancer Center component would
not result in a significant impact to
a scenic vista.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(10) Building designs, exterior colors and materials shall be selected so that they blend and integrate with the
surrounding natural and man-made setting, consistent
with the City’s image.
Cancer Center Component:
Consistent. Building materials
would consist of smooth-finish
stucco, concrete masonry, glass
windows, and composite metal
paneling. The proposed medical
facility would be similar in scale
and style to the existing medical
complex located to north. The
building would take advantage of
the existing changes in topography
on the Cancer Center site and
reduces apparent scale by
notching into the existing
slope/grade. Additionally, as
shown in Figure 3-7a and 7b, the
site will provide 14 percent
landscape coverage, providing
enhanced perimeter landscape,
and softening the visual impact of
the building.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(11) Exterior surface materials shall be of a non-glare finish, pursuant to the Precise Plan of Design. Windows shall be designed and oriented to minimize the relative characteristics of the glass onto the freeway.
Cancer Center Component:
Consistent. As discussed below
under Threshold D, the Cancer
Center would not introduce a
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
substantial amount of glare to the
site.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(12) Where development is proposed in areas adjacent
to existing land uses, building design, scale, use of
material, color and landscaping characteristics shall
complement the existing uses.
Cancer Center Component:
Consistent. Please refer to
Guideline B(10).
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(13 Building identification (signs) shall be selected in compliance with the City’s Municipal Sign Ordinances, in particular that which pertain to the freeway corridor.
Signs shall be designated to compliment the building’s
architecture and not impose a visual impact. Criteria for signage shall include letter design, color, overall sign area in proportion to setback distances, illumination,
sign area ration to wall or fascia surfaces, and
consistency in size and location with existing signs in the area.
Cancer Center Component:
Consistent. The Cancer Center
component would submit a Sign
application to ensure that the
Cancer Center Component signage
would be compliant with the City’s
Municipal Sign Ordinances.
Approval of a Sign application
would be submitted and issued
following an approval of the
Project.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(14) Site planning and architectural treatment of
buildings shall be employed to precent the visual
exposure of service bays, storage material, trash
enclosures and loading and unloading activities from the freeway corridors.
Cancer Center Component:
Consistent. As shown in Figure 4.1-
4, views of the proposed building
would be limited to the roofing and
a small portion of the building’s
façade. Service bays, storage
material, trash enclosures and
loading and unloading activities
would not be visible from U.S. 101.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
(15) Exterior illumination of structures shall be kept to a minimum and located primarily at building entrances and landscape features. Lighting should be indirect and
recessed.
Cancer Center Component:
Consistent. As discussed below
under Threshold D, the Cancer
Center would not introduce a
substantial amount of light and
glare to the site or surrounding
areas.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(16) Illumination from within buildings should be
controlled by window design location and tinting Window glass should be designed to control spillage of light from interior spaces.
Cancer Center Component:
Consistent. As discussed below
under Threshold D, the Cancer
Center would not introduce a
substantial amount of light and
glare to the site or surrounding
areas.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
Section C- Walls, Barriers, Berms
(1) Where barrier screening for visual or noise mitigation is necessary such treatment shall consist of a
combination of decorative walls undulating berms of
various heights and innovative use of combined
evergreen and deciduous landscape plant materials
Cancer Center Component:
Consistent. As part of
implementation of MM-NOI-1, the
project contractor would install
temporary noise abatement on the
site boundary fencing during
construction of the Cancer Center
component. No other noise or
visual mitigation is proposed as
part of the Cancer Center
component.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(2) Long and linear wall sections shall be avoided These elements should be staggered by methods that provide
both horizontal and vertical relief and landscaped with clusters of native plant materials Use of various
Cancer Center Component:
Consistent. Retaining walls would
be located in the northeast corner
of the Cancer Center site and along
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
combinations of wall material is encouraged to achieve a greater aesthetic effect
the southern project boundary. The
retaining walls would be tiered,
providing vertical relief to the
visual impact of the walls. Further
landscaping such as larger trees
would be placed around the project
site perimeter, adjacent to the
retaining walls.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(3) Vines and/ or other clinging plant material shall be used to visually accent where space may preclude the
use of other larger plants,
Cancer Center Component:
Consistent. As shown in Figures 3-
7a and 7b. the site will provide 14
percent landscape coverage, which
will include the planting of trees,
shrubs, ground cover, and other
landscaping elements.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(4) Planted earthen berms shall take precedence over
construction of walls to emphasize the natural setting
Cancer Center Component:
Consistent. Please see Guidelines
C(2).
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(5) Screen walls shall consist of decorative materials that integrate and compliment the building’s architecture.
Cancer Center Component:
Consistent. Please see Guidelines
C(1).
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(6) All manufactured berms shall incorporate grading
techniques which emphasize a natural condition
Manufactured slopes shall consist of undulating
contours of various slope ratios Use of boulders and
other natural native rock material is encouraged
Cancer Center Component:
Consistent. The Cancer Center is
positioned on site to utilize the
existing developed portion of the
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
site that was previously graded and
developed, however grading on site
would still be required. Retaining
walls would be located in the
northeast corner of the project site
and along the southern project
boundary. The retaining walls
would be tiered, providing vertical
relief to the visual impact of the
walls. The retaining walls would be
angled to mimic the existing
topography on site. Further
landscaping such as larger trees,
scrubs, and boulders would be
placed around the project site
perimeter, adjacent to the
retaining walls.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
Section D- Landscape Planting
(1) Landscaping shall be used to complement and
enhance building architecture not to camouflage poor
building design
Cancer Center Component:
Consistent. As shown in Figures 3-
7a and 7b, the site will provide 14
percent landscape coverage, which
will include the planting of trees,
shrubs, ground cover, and other
landscaping elements.
Landscaping on site is designed to
soften the visual impact of the
Cancer Center and enhance
building design.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(2) Landscaping shall be used to soften the visual impact of buildings walls grading and other site improvements.
Cancer Center Component:
Consistent. Please see Guideline
C(2).
Janss Road Component:
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(3) The type of plant material height and massing of
vegetation should not dominate building structures but
complement them.
Cancer Center Component:
Consistent. Project landscaping
would consist of a variety of
landscaping elements such as
larger trees, scrubs, and
groundcover. These elements will
be scattered throughout the
Cancer Center site and will not
substantially block views of the
building.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(4) Plants shall be used which offer variety of color shape and species with an emphasis on drought tolerant native plant materials Plant selection shall also include an
appropriate ratio of evergreen to deciduous for interest.
Cancer Center Component:
Consistent. Please see Guidelines
D(3). Discretionary approval of the
Project would include a Landscape
Plan Check for landscape
conformance review. Additionally,
as required in MM-BIO-8, invasive
plant species are not permitted in
the landscaping plan,
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(5) The planting of Oak trees should be implemented
wherever possible to aid in the establishment and
reinforcement of the City’s image. This image can be
further enhanced by the selective night time lighting of signature oak trees
Cancer Center Component:
Consistent. While the Cancer
Center component would include
the removal of some oak trees,
with the implementation of MM-
BIO-9, the Oak trees on site would
be replaced. Additionally, the
landscape plan includes Oak trees.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
(6) Height of landscape planting should be controlled to maintain views of ridgelines and other scenic features
from the freeways
Cancer Center Component:
Consistent. As shown in Figure 4.1-
4, views of the proposed building
would be limited to the roofing and
a small portion of the building’s
façade. The building’s roofline is
well below the views of ridgeline
within Los Padres Open space. As
discussed under Threshold A, the
Cancer Center component would
not result in significant impacts to
scenic resources.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(7) Solid rows of landscaped screening along continuous sections of the roadway should be avoided Designs of
plant materials should vary to provide interest avoiding straight rows of trees or other vegetation
Cancer Center Component:
Consistent. Please see Guideline
D(3).
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(8) Alternate groupings of plants and open spaces to
frame
and preserve distant views
Cancer Center Component:
Consistent. Please see Guideline
D(3) and D(6).
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(9) Monotonous repetitions in plant spacing should be
avoided the number and distance between adjoining
plants should be varied
Cancer Center Component:
Consistent. Please see Guideline
D(3).
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
(10) Vegetation shall be planted behind and in front of buildings to soften hard edges of architectural design
Cancer Center Component:
Consistent. Please see Guideline
D(3) and D(6).
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
(11) For in-fill projects, the selection of landscape
material shall match of be compatible with established
roadside and/ or surrounding vegetation.
Cancer Center Component:
Consistent. Project landscaping
would consist of larger trees,
including oak species, shrubs, and
groundcover. The planting plan
addressing project impacts to
sensitive on-site vegetation, and
also provides for site coverage in a
comparable manner as existing
adjacent medical facilities.
Janss Road Component:
Not applicable. Janss Road
Component is not located within a
Freeway Design Corridor.
Table 4.8-1. Project Consistency with General Plan – Cancer Center Site Applicable Land Use Goals or Policies Would the Project conflict? General Development Policies
Policy 1.1 Overall City structure. Establish a
clearly defined urban pattern of development
and open space by expanding and diversifying
the employment uses in the City with a focus on
biotech, high tech, research and development,
and office uses.
Would not Conflict: The Project would
develop a new medical office building on a
property near other medical office buildings
to the north. The Project would maximize
employment opportunities by entitling a
Cancer Center that is responsive to market
needs and which will add high quality jobs to
the Cancer Center site.
Policy 1.3 Balance character and infill. Maintain
community character while promoting infill
development that brings needed housing,
amenities, and jobs to the City.
Would not Conflict. The Project would
develop a medical office building on a
property near other medical office buildings
to the north. The scale of the new medical
office building and the existing medical
office buildings and apartments are similar.
Policy 10.1 Public View Corridors. Reaffirm and
update adopted view sheds protection within
the Ridgeline Study. Promote development
Would not Conflict: Since the Cancer Center
site is within 1,000 feet of the centerline of
U.S. Highway 101, development is required
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
practices that enhance and frame views of the
mountains and ridgelines from view corridors
along public rights of way.
to comply with the Guidelines for
Development within the Corridors of the
Route 101 and 23 Freeways Corridor. As
discussed in Section 4.1, Aesthetics,
impacts would be less than significant.
Additional Goals and Policies
Goal LU-11: Power existing and new buildings
with clean energy.
Would not Conflict. Refer to Section 4.6,
Greenhouse Gas Emissions with regard to
the Project’s proposed and required
sustainable features.
Healthcare: Goal CFS-14: Ensure access to
quality health and mental healthcare and social
services that support all stages of living in
Thousand Oaks.
Would not Conflict: The Project would
provide a state-of-the-art Cancer Center that
consolidates various cancer services, cancer
medical equipment, and patient service-
related functions within a single
comprehensive cancer treatment facility
located adjacent to the existing Thousand
Oaks Surgical Hospital (TOSH) to allow for
improved patient convenience, efficiency,
and quality of care.
Air Quality: Goal C-10: Achieve and maintain air
quality that protects public health, safety, and
welfare for those who live or work in the City
and for visitors.
Would not Conflict. Refer to Section 4.2, Air
Quality, and Section 4.6, Greenhouse Gas
Emissions; impacts with regard to air quality
and GHG emissions would be less than
significant.
Conservation: Policy 2.2: Protected tree
preservation. Continue to implement the City’s
Oak Tree and Landmark Tree Ordinances per
the Municipal Code and the Oak Tree
Preservation and Protection Guidelines.
Would not Conflict. As detailed in Section
4.3, Biological Resources, impacts to oak
trees would be less than significant with the
incorporation of mitigation measure (MM)-
BIO-10 through MM-BIO-13.
Conservation: Goal C-9: Minimize disturbance
of wetlands and riparian habitat.
Would not Conflict. As detailed in Section
4.3, Biological Resources, impacts to
wetlands would be less than significant.
Conservation: Policy 2.2. Slope development.
Limit development on steep slopes and
ridgelines.
Cancer Center Component:
Consistent. Portions of the Cancer Center
site contain slopes with a 25% natural grade
of greater. Slopes on the Cancer Center site
greater than 25% are limited to the southern
portion of the Cancer Center site behind the
proposed Cancer Center building and along
the eastern boundary of the Cancer Center
site.
While the Cancer Center component would
include grading on slopes that are over 25%
natural grade, and the development of the
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.1-1 Project Consistency With Scenic Quality Policies and Zoning Policy Discussion
site would include construction of a 9-foot-
high tiered retaining wall along the southern
boundary (and segments of the eastern and
western boundary). As shown in Figure 4.1-
6, views of the graded area tiered retaining
walls from Rolling Oaks Drive would be
partially obstructed by the Cancer Center
building and landscaping. Additionally, views
would be brief as pedestrians and motorists
travel along Rolling Oaks Drive and views of
the retaining walls and altered slopes would
be limited and not result in a substantial
effect to existing scenic quality. The Cancer
Center does not propose manufactured
slopes nor fill that would exceed 25 feet.
Janss Road Component:
Not applicable. The Janss Road site does
not contain slopes with a 25% natural grade
or greater.
Table 4.8-2. Project Consistency with General Plan – Janss Road Site Applicable Land Use Goals or Policies Would the Project conflict? Land Use Element Goals
Goal LU-3: Promote a diversity of housing types
for Thousand Oaks residents through all stages
of life.
Would not Conflict. The Project would allow
the capacity for a future project to develop
residential units on a property near other
residential uses to the south.
Land Use Element Policies
Policy 1.3 Balance community character.
Maintain community character while promoting
infill development that brings needed housing,
amenities, and jobs to the City.
Would not Conflict. The Project would allow
the capacity for a future project to develop
residential units on a property near other
residential uses to the south.
Policies 3.1 Diversity of housing. Promote a
diversity of housing types in locations
throughout the City, specifically in
neighborhood areas that contain goods and
services, parks and open space, and public
schools in a walkable setting.
Would not Conflict. No residential
development is proposed as part of the
Project. However, compliance with local
regulation would require any future
development to be consistent with the
general plan policies in effect at the time of
complete submittal. Public schools, parks
and open space and services are in a
walkable distance from the Janss Road site.
It can currently be assumed that the
development would consist of up to nine
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 4.8-2. Project Consistency with General Plan – Janss Road Site Applicable Land Use Goals or Policies Would the Project conflict? single-family detached and/or attached
homes to further diversify the housing stock
found throughout the City.
Additional Policies
Air Quality: Goal C-10: Achieve and maintain air
quality that protects public health, safety, and
welfare for those who live or work in the City
and for visitors
Would not Conflict. Refer to Section 4.2, Air
Quality, and Section 4.6, Greenhouse Gas
Emissions. As detailed there, the Project’s
impacts with regard to air quality and GHG
emissions would less than significant.
Conservation: Policy 2.2: Protected tree
preservation. Continue to implement the City’s
Oak Tree and Landmark Tree Ordinances per
the Municipal Code and the Oak Tree
Preservation and Protection Guidelines.
Would not Conflict. As detailed in Section
4.3, Biological Resources, impacts to oak
trees would be less than significant with the
incorporation of MM-BIO-10 through MM-
BIO-13.
As seen in the above tables, the project is consistent with the General Plan. The project was reviewed for its effect on physical design on the environment, and mitigation measures have been incorporated into the project’s conditions of approval. Therefore, the pr oject is consistent with the goals and policies of the City’s General Plan.
In response to the types of amendments which require voter approval described in TOMC Sec. 9-2.203(b):
a. The amendment will not affect any land area designated as "Existing Parks, Golf Course s, Open Space." The sites are currently designated as “Neighborhood Very Low” and
“Institutional“ and will be re-designated as “Commercial Neighborhood” and “Neighborhood Low 1”.
b. On July 5, 2022, the City C ouncil adopted Resolution No. 2022-040, "A Resolution of the City Council of the City of Thousand Oaks Declaring Intention to Consider an
Amendment to the Land Use Element of the General Plan for Land Located at 400 East Rollin g Oaks Drive and 355 West Janss Road and Allowing Conc urrent Processing of
Entitlement Applications for Contemplated Development of the Land Located at 400 Esat Rolling Oaks Drive (LU 2022- 70587: Hospital Corporation of Am erica)". As part of that Resolution, the City Council found the amendment is
consistent with Measure E (Municipal Code Sec. 9-2.203 and Sec. 9-2.204) because it will not increase the Citywide
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
residential or commercial capacity above that which existed on November 5, 1996, when Measure E was adopted.
c. With the adoption of the 2045 G eneral Plan on December 5, 2023, Measure E units were inco rporated into the base land uses. Therefore, there is no increase or change in the maximum number of residential dwelling units which could be proposed from the existing condition as the proposed General Plan Amendment does not in crease or decrease the
residential capacity allowed by the land uses.
The Housing Crisis Act of 2019 (HCA), or SB 330, was passed by the California Legislature in October 2019 to help address California’s housing shortage. The HCA included
amendments to the State’s Housing Accountability Act (HAA), Planning and Zoning Law, and Permit Streamlining Act,
setting new provisions statewide for the review and approval of housing development projects by local jurisdictions.
Among other requirements, the HCA generally prohibits local jurisdictions from “downzoni ng” or reducing the residential development capacity of a site where housing is currently an allowed use. Specifically, Government Code Section
66300(b)(1)(A) precludes a local jurisdiction from changing the general plan land use designation, specific plan land use designation, or zoning of a parce l or parcels of property that would individually or cumulatively reduce the site’s residential development capacity below what was allowed under
planning and zoning regulations as they existed on January 1, 2018. The HCA provides two exceptions from this
downzoning prohibition: when a ju risdiction obtains approval of a proposed housing moratorium ordinance from the State’s Department of Housing and Community Development (HCD)
(Government Code Section 663 00(b)(1)(B)(ii), or when a jurisdiction concurrently changes the development standards, policies, and conditions applicable to another parcel or parcels within the jurisdiction to ensure that there is no net loss in residential capacity fo r the jurisdiction (Government Code Section 66300(i)). The City utilized the second
exception on July 5, 2022, wh en the City Council approved the Applicant’s request to initiate a General Plan Amendment to change the land use categories for both the site at 400 East Rolling Oaks Drive and 355 West Janss Road as well as
authorized concurrent processi ng of legislative actions and
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
project entitlements for the project located at 400 East Rolling Oaks Drive.
To allow the development of the Cancer Center component of the Project, the Cancer Center site’s General Plan land use designation is to be changed from Neighborhood Very Low to Commercial Neighborhood, and its zoning designation is to be changed from Rural-Exclusiv e (R-E-1AC) to Commercial Office (C-O). These changes will reduce the residential development capacity of the C ancer Center site by nine dwelling units, triggering the application of the HCA’s no net loss provision. The City is complying with the requirements of HCA by concurrently changing the development standards, policies, and conditions applicable for the Cancer Center site’s downzoning to another parcel to ensure no net loss of residential development capacity occurs in the City.
The Applicant owns the Janss Road site, which is currently subject to a General Plan land use designation of Institutional and a zoning designation of Public, Quasi-public, and
institutional Lands and Facili ties. To accommodate the nine- unit reduction in residential development capacity associated with the General Plan and zoning designation changes at the Cancer Center site and to achieve compliance with the HCA, the Janss Road site’s General Plan designation will be changed to Neighborhood Low 1 and its zoning designation to Residential Planned Develo pment, maximum 4.5 dwelling units per acre. The new General Plan and zoning
designations for the Janss Road site would establish a
residential development capacity of nine dwelling units at this property.
The land use changes stated above will meet the no net loss in residential c apacity requirements of Government Code Section 66300(i)(1).
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Table 1 – Current and Future Residential Capacity
Address Area 1 Current
Designation
Current
Residential
Capacity
New
Designation
New
Residential
Capacity
Sending/
Project
Property
400 East
Rolling
Oaks
Drive
4.74 Acres
Neighborhood
Very Low (1-2
Units/Acre)
9 Units Commercial
Neighborhood None
Receiving
Property
355 West
Janss
Road
2.145
Acres Institutional None
Neighborhood
Low (2-4.5
Units/Acre)
9 Units
Although a specific housing pr oject is not required by SB330 or any other State law to be proposed at the Janss Road site at this time, the Final EIR nevertheless conservatively analyzed and disclosed the foreseeable potential
environmental impacts of a ni ne-unit future residential development at that location. Environmental analysis of a potential residential development at the Janss Road site at this early stage is consistent with CEQA’s requirements to study the potential for foreseeabl e impacts at the earliest possible opportunity.
d. The amendment is consistent with Measure E (Municipal Code Sec. 9-2. 203 and Sec. 9- 2. 204) because it will not increase the Citywide residentia l or commercial capacity above that which existed on November 5, 1996, when
Measure E was adopted.
3. The project has been reviewed in conformance with the provisions of the California Environmental Quality Act.
The General Plan Amendment has been reviewed for conformance with the provisions of the California En vironmental Quality Act. For this application, the City is the Lead Agency and, on behalf of the Applicant, the City Council certifies the Final EIR that was prepared for the project.
The Final EIR identifies where all ar eas listed as potentially significant have been mitigated to levels that are no longer significant, through the inclusion of mitigation measures, wh ich the applicant shall comply with under the conditions of approval.
1 2045 General Plan: Dwelling Units Per Acre (DU/AC): The term density is used for residential uses and refers to the population and development capacity of resi dential land. Density within the General Plan is described in terms of dwelling units per gross acre of land (du/ac), which consists of total land area, including areas dedicated for future public uses, such as infrastructure facilities, parks, streets and rights-of-way. Existing streets, whether dedicated right-of-way or in easement are not included in gross acre of land.
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
SECTION 4
WHEREAS, the subject property at 400 East Rolling Oaks Drive is now vacant with a surface parking lot, foundations, and landscaping remaining from the former Young Set Club daycare facility, the site has been vacant since 2018, and;
WHEREAS, the zoning on the subject property at 400 East Rolling Oaks Drive is currently "Rural Exclusive, 1 acre minimum (R-E)" and the new zoning would be "Commercial Office/Height Over lay (C-O/C-O-H)" with the Height Overlay, limited to the building footprint and at the finished floor levels as indicated in the plan materials, to allow a buildi ng to be up to 44-feet 2-inches tall for the property at 400 East Rolling Oaks Drive to accommodate the Cancer Center medical office building at a maximum building height of 44-feet 2-inches; and
WHEREAS, the subject property at 355 West Janss Road is now a surface parking lot with landscaping associated with the Los Robles Hospital, and;
WHEREAS, the zoning on the subject property at 355 West Janss Road is currently "Public, Quasi-Public, and Instit utional Lands and Facilities Zone (P-L)" and the new zoning would be "Residential Planned development-4.5 dwelling units per acre (RPD-4.5U)" to be consist ent with the Land Use Designation of Neighborhood Low 1 (˃2-4.5 units per acre) and SB 330; and
WHEREAS, the City Council of the City of Thousand Oaks, has given notice thereof as required by law, held a public hearing on the application of the City of Thousand Oaks with respect to the requested Zone Change 2022-70733-Z to allow a Zone Change as described above in these recitals; and
WHEREAS, the City Council has ca refully considered all pertinent testimony and the staff repor t offered in the case as presented at the public hearing; and
WHEREAS, the findings of the City Council approval of said Zone Change 2022-70733-Z application are as follows:
1. A proposed change of the boundaries of a zoned area, or a proposed change of zone classification, or a proposed amendment to the provisions of this chapter may be initiated as follows: (a) By the adoption of a resolution by the Council requesting the Commission to set the matter for hearing, report, and recomme ndation; (b) By the adoption of a resolution by the Commission setting the matter for hearing and study; and (c) By filing with the Community Development Director a verified application of a change of zone cla ssification by the owner of the property, by a person with a power of attorney from the owner, or by the attorney-at-law of the owner. If the applicant complies with all the
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
provisions of this article, the Community Development Director shall set the matter for public hearing. (TOMC Section 9-4.2902).
On July 5, 2022, the City Council in itiated a General Plan Amendment through the adoption of Council Resolu tion No. 2022-040, and the City Council authorized the concurrent processing of entitlement applications, including the Zone Change 2022-70733-Z application, for the project requiring the Commission to make a recommendation to Council for the whole of the entitlement request.
2. In all cases of proposed zone changes and amendments initiated by verified applications, the Commission shall forward to the Council by resolution, those applications fo r which the Commission recommends the adoption of an ordinance by the Council. In the case of applications for which the Commission reco mmends a denial and which the Commission does not recommend the adoption of an ordinance, a resolution setting forth such determination shall be forwarded to the City Council. The action of the Commission shall become final following such denial, unless: (1) The applicant files, no later than five (5) days after the Planning Commission files its resolution with the City Council, a written application with the City Clerk reques ting that the matter be set for a public hearing before the Council; and (2) The party filing such application submits a filing fee in an amount prescribed by Council resolution. (TOMC Section 9-4.2914(b)).
The Commission findings for recommending approval of said Zone Change 2022-70733-Z application, adopted by Resolution No. 05-2024 PC, are as follows:
a. The project is consistent with the Thousand Oaks General Plan and any applicable specific plan or redevelopment plan.
As described above in SECTION 3 (2022-70587-LU) Finding 2, the whole of the project has been found to be consistent with the 2045 General Plan and TOMC, and those findings are incorporated by reference into this finding.
400 East Rolling Oaks Drive
The Zone Change will re-designa ted approximately 4.74 net acres of land at 400 East Rolling Oaks Drive from Rural Exclusive, 1 acre minimum (R-E) to Commercial Office/Height Overlay (C-O/C-O-H) with the He ight Overlay, limited to the building footprint and at the fini shed floor levels as indicated in the plan materials, to allow a building to be up to 44-feet 2-
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
inches tall at said property in order to remain consistent with the subject property's Gener al Plan Land Use Element
designation, which will be Co mmercial Neighborhood, upon adoption by City Council. This designation accommodates a variety of neighborhood-serving retail, offices and service activities designed to serve t he daily needs of residents, in support of the General Plan Healthcare Goal “CFS-14: Ensure access to quality health and m ental healthcare and social services that support all stages of living in Thousand Oaks.” The project includes the develop ment of a Cancer Center medical office building on the site which would consolidate multiple oncology and medical related functions in a single campus. Furthermore, the Cancer Center’s location adjacent to the Thousand Oaks Surgical Hospital (TOSH) will directly facilitate the effective provision of these services.
Within the City, a total of 15 properties have a C-O zone, all 15 C-O properties abut or are lo cated across the street from properties with residential zoning (R-E, R-1, R-3, RPD, HPD, Ventura County – R-O). Consis tent with the purpose of the C-O zone
2, and in practice, the C-O zone acts as a transition
space between higher intensity uses (P-L, C-1, C-2, C-3, C-4, CPD, M-1), open space (O-S ), and/or Route 101 and
residential uses.
The C-O zoning would be consis tent with the existing zoning in the near vicinity of 400 East Rolling Oaks. Properties to the north and northwest of 400 Ea st Rolling Oaks Drive are already zoned as C-O and P-L (Public, Quasi-Public, and Institutional), and these prope rties already abut or are adjacent to properties with zoned C-O, P-L, O-S (Open
Space), RPD (Residential Pl anned Development), and R-O (Ventura County – Single-Family Estate).
The subject property abuts open space to the south,
apartments to the west, single fa mily homes to the east, and the TOSH and associated medical offices on the opposite side of East Rolling Oaks Drive to the north. In addition, the building footprint is approximately 630 feet from the nearest single- family residence to the south, approximately 350 feet from the
2 TOMC Section 9-4.1101. Purpose (C-O) “To provide a method by which land located in or adjacent to residential areas may be designed and developed as a unit fo r professional and limited commercial offices, and to produce a professional and limited commercial office development which will be co mpatible and harmonious with the existing or potential development of adjacent residential or other areas, and to fo ster professional and limited commercial office developments which meet high standards of open space, the concentrati on of buildings, parking facilities, landscaping, and pedestrian and vehicular circulation, Commercial Office Zones (C-O) are established to provide suitable alternative locations for offices and services of a professional, clerical, or administrative nature.”
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
nearest single-family residence to the east, and approximately 175 feet from the nearest apartment unit to the west. Finally, no development is proposed on th e southerly portion of the property, which will maintain a reasonable buffer from the adjacent 20-acre open space parcel owned by the Conejo
Open Space Conservation Agency (COSCA). As such, the
existing medical office building uses are found to be compatible with surrounding residential and open space uses.
The C-O/C-O-H zoning of the property would allow a medical office building to function in a similar manner to the medical office buildings to the north and northwest. As the existing medical office buildings have been found to be compatible with the existing surrounding de velopments, the medical office building of similar scale and operational characteristics is also found to be compatib le with the adjacent uses, including the TOSH and medical office buildings to the north and east, residential uses to t he west, the open space to the south, and the residences further to the south.
The Height Overlay (C-O-H) is to be limited to the building footprint and at the finished floor levels as indicated in the plan materials, to allow a building to be up to 44-feet 2-inches tall.
The site will be graded and the fi nished grade will be set into existing grade between approxim ately 0 to 10 feet and
additional fill will be placed on t he south side of the building resulting in the building appeari ng to be 16-feet shorter as viewed from the south elevation compared to other elevations.
The Height Overlay will result in a building’s height being similar to the existing apartments to the west and similar to or less than the medical office buildings to the north.
The C-O/C-O-H zone is compatible with the surrounding
zones (C-O, P-L, R-3, RPD, Ventura County R-O, and O-S) in terms of both physical devel opment standards and allowed uses. By transferring the residential capacity to the 355 West Janss Road Site, the action also satisfies the requirements under SB 330 of no net loss in residential capacity.
355 West Janss Road
The Zone Change will re-designated approximately 2.145 net acres of land at 355 West J anss Road from Public, Quasi- Public, and Institutional Lands and Facilities Zone (P-L) to Residential Planned development-4.5 dwelling units per acre
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
(RPD-4.5U) in order to remain consistent with the subject property's General Plan Land Use Element designation, which will be Neighborhood Low 1 ( ˃2-4.5 units per acre), upon adoption by City Council. This designation accommodates low density, single-family neighb orhoods between 2 and 4.5 dwelling units per acre, in suppor t of the General Plan Land Use Goal “LU-3: Promote a di versity of housing types for Thousand Oaks residents through all stages of life.” There is currently no development concept or project proposed for the property at 355 West Janss Road at this time.
The RPD-4.5U zoning would be consistent with the existing zoning in the near vicinity of 355 West Janss Road. Los Robles Hospital is located at 215 West Janss Road, and that property has an existing P-L zoning and immediately abuts properties that are zoned R-1 (n orth and east), C-O and C-1 (west) and is adjacent to properties zoned RPD (south).
Properties with an RPD/HPD z one in the area (north and west) abut or are adjacent to properties that are zoned O-S.
These zones have been found to be compatible with one
another in terms of both physical development standards and allowed uses.
400 East Rolling Oaks Drive & 355 West Janss Road
These subject sites are not located within any applicable specific plan or redevelopment plan. Therefore, the Zone Change is in alignment with 2045 General Plan goals and policies and meets this finding.
b. The project is compliant with the Housing Crisis Act.
To comply with SB 330, City is concurrently changing the development standards, policies, and conditions applicable to another parcel or parcels within the jurisdiction to ensure that there is no net loss in residential capacity for the jurisdiction (Government Code Section 66300(i)). The City initiated said process on July 5, 2022, when the City Council approved the Applicant’s request to initiate a General Plan Amendment to change the land use categories fo r both the site at 400 East Rolling Oaks Drive and 355 West Janss Road as well as
authorized concurrent processi ng of legislative actions and project entitlements for the project located at 400 East Rolling
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Oaks Drive. City Council now aut horizes the development of the Cancer Center component of the Project, the Cancer
Center site’s General Plan land use designation is to be changed from Neighborhood Very Low to Commercial
Neighborhood, and its zoning des ignation is to be changed from Rural-Exclusive (R-E-1AC) to Commercial Office (C-O).
These changes will reduce t he residential development
capacity of the Cancer Center site by nine dwelling units, triggering the application of t he HCA’s no net loss provision.
The City is complying with the requirements of HCA by
concurrently changing the development standards, policies, and conditions applicable for the Cancer Center site’s
downzoning to another parcel to ensure no net loss of
residential development capacity occurs in the City. The Applicant owns the Janss Road site, which is currently subject to a General Plan land use des ignation of Institutional and a zoning designation of Public, Q uasi-public, and institutional Lands and Facilities. To accommodate the nine-unit reduction in residential development capacity associated with the General Plan and zoning designation changes at the Cancer Center site and to achieve compliance with the HCA, the Janss Road site’s General Plan designation will be changed to Neighborhood Low 1 and its zoning designation to
Residential Planned Developm ent, maximum 4.5 dwelling
units per acre. The new General Plan and zoning
designations for the Janss Road site would establish a
residential development capacity of nine dwelling units at this property. The City Council approves the land use changes as stated above which wil l meet the no net loss in residential capacity requirements of Government Code Section
66300(i)(1).
c. The project has been reviewed in conformance with the provisions of the California Environmental Quality Act.
The Zone Change has been reviewed for conformance with
the provisions of the California Environmental Quality Act. For this application, the City is the Lead Agency and, on behalf of the Applicant, the City Council certifies the Final EIR that was prepared for the project. The Fi nal EIR identifies where all areas listed as potentially sign ificant have been mitigated to levels that are no longer signifi cant, through the inclusion of
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
mitigation measures, which t he applicant shall comply with under the conditions of approval.
SECTION 5
WHEREAS, the findings of the City C ouncil approval of Development Plan 2022-70732-DP are as follows:
1. The project is consistent with the Thousand Oaks General Plan and any applicable specific pl an or redevelopment pl an (TOMC Section 9-
4.2803(c)(1)).
The City of Thousand Oaks General Plan land use designation for the 400 East Rolling Oaks Drive (APNs 681-0-180-265 and 681-0-180-275) is "Neighborhood Very Low" and has a corresponding zoning designation of Rural Exclusive, 1 acre minimum (R-E). The land use designation and zoning designation ar e to be changed to "Commercial Neighborhood" and "Commercial Office /Height Overlay (C-O/C-O-H) with the Height Overlay, limited to the building footprint and at the finished floor levels as indicated in the plan materials, to allow a building to be up to 44-feet 2-inches tall" respectively.
The project consists of the demolit ion of all improvements on the property and construction of an approx imately 58,412 square foot (sf) medical office building that accommodates various cancer medical and patient services. The building height would range between 27 feet and 44 feet 2 inches at its highest point. Primary access would be off Rolling Oaks Drive and secondary access off Los Padres Drive with open and covered parking provided on the property. The project also includes the installation of hardscape, landsc ape, utilities, retaining walls, and associated grading on slopes steeper than 25 percent.
As described above in SECTION 3 (2022-70587-LU) Finding 2, the whole of the project has been found to be consistent with the 2045 General Plan and TOMC, and those fi ndings are incorporated by reference into this finding. Therefore, the project is consistent with the goals and policies of the City’s General Plan. The project is not subject to a specific plan or redevelopment plan.
2. The project complies with all app licable laws, regulations and policies, including the Thousand Oaks Muni cipal Code (TOMC Section 9-
4.2803(c)(2)).
The design of the Cancer Center complies with all applicable laws, regulations, and policies, includi ng the C-O/C-O-H zone, City’s
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Architectural Design Guidelines fo r Construction and Development of Residential, Industrial, and Institutional Projects (Resolution No. 2023- 061), and Freeway Corridor Design Guidelines (Resolution No. 91-172) in that the building architecture is com patible with other structures in the vicinity.
Specifically, the Cancer Center would consist of an approximately 58,412 sf medical office building woul d consolidate multiple oncology and medical related functions in a single campus.
The Cancer Center has been designed in compliance with all TOMC C- O/C-O-H development standards as shown in the staff report’s “Table 2 – Consistency with C-O/C-O-H Development Standards” and “Table 4 – Consistency with Parking Standards”.
The project’s architectural design is a Mission Revival style. The building’s shape (rectangle), stories (2 stories), height (23 feet 5 inches to 44 feet 2 inches), and size (58,412) are similar to and compatible with the nearby medical office buildings to the north and northwest and the apartments to the west.
The building provides ar chitectural interest through gabled and hipped roof forms, a shed-roofed/covered walkway along the first-floor’s north, west, and east elevations, and a porte-c ochere at the main entry. The exterior walls of the bu ilding are earth-toned colors primarily consisting of off-white, light-bro wns, and tan. The overa ll structure would be composed of a combination of walls with a sandblasted texture, metal wood-look beams, decorative ceramic wall tile, and recessed anodized aluminum storefront doors and windo ws (similar to the nearby medical office buildings and TOSH) primarily with clear glazing. The roof material consists of clay tiles, and building walls contain trim and architectural details such as corbels. These colors and materials blend with the surrounding terrain and bu ilt environment on the adjacent medical office buildings and TOSH to the north and northwest, the apartments to the west, and the single-family residences to the south.
The building design and materials comp ly with the City’s Architectural Design Guidelines for Construction and Development of Residential, Industrial, and Institutional Projects (Resolution No. 2023-061) and the Freeway Corridor Design Guidelin es (Resolution No. 91-172) as described in the staff report and as conditioned in this Resolution.
The project complies wit h Code requirements fo r landscape setbacks including: a) front, rear and side yard setbacks; b) 10% minimum
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
landscaped area in th e parking lot ar ea; and additional required landscaping for compact vehicle spaces.
The City Council finds that the project complies with all applicable laws, regulations and policies, including the Thousand Oaks Municipal Code, and the project’s architectural desi gn is compatible with surrounding development and complies with the standards of the City’s Architectural Design Guidelines for Construction and Development of Residential, Industrial, and Institutional Projects (Resolution No. 2023-061) and the Freeway Corridor Design Guidelines (Resolution No. 91-172). The vehicular and pedestrian circulation layout has been conceptually reviewed and found to be in compliance with the TOMC, Building Code, Fire Code, and ADA standards.
The grading plans identify the pr operty’s slope and where grading will encroach into 25% and steeper natural terrain. The majority of the encroachments (the yellow areas) are on the east and south sides of the building and are required to construct the drive aisle, level parking spaces, and associated circulation and to provide Fire Department access to the rear of the building as well as parking lot improvements consistent with the TOMC and Fire regulations.
It is the City’s policy to limit grading encroachments into 25% and steeper natural terrain unless there is significant justification to do so. In this instance, portions of the hillside area on the east side of the property were previously disturbed with large quantities of sand to accommodate recreational improvements associated with the Young Set Club activities and a Southern California Edison easement area with transmission poles and overhead lines. A combi nation of rounded contour grading techniques and retaining walls with landscaping are designed to visually blend the natural, existing, and pr oject slopes. The City Council supports the encroachment into 25% and steeper terrain as the graded areas are not visually prominent, and the grading involves the use of contour grading techniques to visually blend the disturbed and natural terrain.
Additionally, to achieve the grading approach as described in the prior paragraph, the retaining walls will be constructed primarily along the southern and eastern property lines. The retaining walls will utilize a tiered approach to both break up the height of the retaining walls and to introduce landscaping to soften the walls. The tiered walls will range in height from approximately 7 feet 4 inches to a maximum of 12 feet. The City Council supports the retaining walls to exceed a maximum height of 6 feet up to a maximum of 12 feet as shown on the plans for purposes of complying with TOMC and Fire regulations, and to reduce the amount
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
of grading without negatively impacting public views of the property. As conditioned, all retaining walls and exposed components on the project site are required to incorporate the design and materials from the building to unify the Project’s design.
Additionally, the project has also been reviewed by other City departments and agencies for conf ormance with applicable laws, regulations, and policies, and pr ovided appropriate conditions of approval. Therefore, the project complies with all applicable laws, regulations, and policies, including the Thousand Oaks Municipal Code.
3. The project will not be detrimental to the public health, safety or general welfare (TOMC Section 9-4.2803(c)(3)).
The project will not be detrimental to public health, safety, or general welfare because the project has been reviewed and approved by the Community Development Department, Public Works Department, Police Department, and the Ventura County Fire Department (VCFD). With the incorporation of the conditions se t forth by these departments and agencies, the project will not be detrimental to public health, safety, or general welfare as the granting of this permit:
a. Will maintain the degree of compat ibility of property uses that the Zoning Ordinance is intended to promote and preserve, considering the particular site, and uses on parce ls within the zone in which the use is located; and,
b. Will not result in a use which may reasonably be expected to become obnoxious, dangerous, offensive or injurious to the public health, safety or welfare, by reason of th e emission of noise, smoke, dust, fumes, vibrations, odor or harmful or annoying substances: and,
c. Will preserve the integrity and char acter of the zone in which the use will be located and the utility and the value of property in the zone and in adjacent zones; and,
d. Will not become detrim ental to the public inte rest, health, safety, convenience or general welfare.
As demonstrated in the environmental document (2022-70775-EIR), the project will not unreas onably interfere with the use and enjoyment of neighboring, existing, or future deve lopments. Specifically, the project would not create traffic or pedestrian hazards because the project would utilize a network of roads that were designed to accommodate the vehicle traffic generated by this development and the existing
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
development including the residential, commercial, office, institutional, and open space uses in all directions. The project has been conditioned to construct sidewalks along the proj ect site’s northern frontage to enhance pedestrian connections to th e surrounding area. Traffic impacts were independently reviewed by the City’s Traffic Engineering Division who concluded that the project will not have a significant impact on existing traffic patterns or vehicl e miles traveled. The applicant will be required to pay the Citywide traffi c mitigation fee to help contribute towards the cost of future improvements at the intersections identified in the City's Traffic Impact Mitigation Fee Nexus Study. As identified in the environmental document, the project’s noise is anticipated to be similar to and compatible with the surrounding residential, commercial, office, institutional, and open space uses development.
Therefore, the City Council finds the project will not be detrimental to the public health, safety, or general we lfare with the in corporation of Mitigation Measures required by 2022-70775-EIR and conditions of approval.
4. The project has been reviewed in conformance with the provisions of the California Environmental Quality Act (TOMC Section 9-4.2803(c)(4)).
The Development Permit has been re viewed for conformance with the provisions of the California En vironmental Quality Act. For this application, the City is the Lead Agency and, on behalf of the Applicant, the City Council certifies the Final EIR that was prepared for the project.
The Final EIR identifies where all ar eas listed as potentially significant have been mitigated to levels that are no longer significant, through the inclusion of mitigation measures, wh ich the applicant shall comply with under the conditions of approval.
SECTION 6
WHEREAS, the findings of the City Council approval of Parcel Map Waiver PMW 2022-70736-PMW are as follows:
1. The proposed division complies with all requirements as to area, improvements and design, floodwat er drainage control, appropriate improved public roads, wastewater fac ilities, water supply availability, environmental protection, and other requirements of the Subdivision Map Act and this Code,” per TOMC Sec. 9-3.302(b).
The lot merger will merge two parcels into one parcel to accommodate the development of a Cancer Cent er medical office building. The subject site is made up of two legal parcels with a combined size of
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
approximately 4.74 net acres and 4. 92 gross acres located at the southeast corner of Rolling Oaks Drive and Los Padres Drive, contiguous to each other.
The larger lot comprised the site of the prior daycare center facility, while the smaller lot was designated as a public road easement.
Parcel 2 was originally considered in 1973 as part of an extension for a road easement for East Rolling Oaks Drive. However, after study and public testimony, Haaland Drive was c onstructed in lieu of extending East Rolling Oaks Drive to the ea st, and therefore the road easement is no longer needed for that purpose. In order to develop the site, the two parcels must be merged into one parcel of record.
As provided under Subdivision M ap Act Sec. 66412(d) (hereafter referred to as “Map Act”), the Lot Merger is excluded from the provisions of the Map Act since: 1) the waiver is between fo ur or fewer existing adjoining parcels; 2) land would be taken from one parcel and added to another; and 3) a greater number of parcels that originally existed is not created.
According to Map Act Section 66412(d) and Zoning Ordinance Section 9-3.302, the City may only determine whether the parcel resulting from the waiver conforms to local zoning and building ordinances. The standards of these ordinances are fix ed in this case, and the waiver’s conformance with them is determined through objective measurement.
The lot resulting from the lot mer ger is compliant with all development standards of the C-O/C- O-H zone, including a minimum lot area of 20,000 square feet and a minimum lot width of 100 feet of street frontage.
The lot resulting from the lot merger would not alter floodwater drainage control, public roads, wastewater facilities, or water supply availability; however, the larger parcel that would be created would provide opportunity for development with appropriately sized floodwater drainage control. As identified in the envir onmental document, the project site has adequate access to public roads, wastewater facilities, water supply availability.
Therefore, the project complies wit h all requirements as to area, improvements and design, floodwat er drainage control, appropriate improved public roads, wastewater fac ilities, water supply availability, environmental protection, and other requirements of the Subdivision Map Act and this Code.
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
2. The project has been reviewed in c onformance with the provisions of the California Environmental Quality Act.
The Parcel Map Waiver has been re viewed for conformance with the provisions of the California Envi ronmental Quality Act. For this application, the City is the Lead Agency and, on behalf of the Applicant, the City Council certifies the Final EIR that was prepared for the project.
The Final EIR identifies where all areas listed as potentially significant have been mitigated to levels that are no longer significant, through the inclusion of mitigation measures, which the applicant shall comply with under the conditions of approval.
SECTION 7
WHEREAS, the findings of the City C ouncil approval of Protected Tree Permit 2022-70735-PTP are as follows:
1. The condition or location of the oak trees requires cutting to maintain or aid its health, balance, structure, or to maintain adequate clearance from existing structures (TOMC Section 9-4.4206(b)(1)).
Per the applicant’s Protected Oak Tree Arborist Report, dated August 22, 2023, and prepared by Evergreen Arborist Consultants, Inc., Michael Green, Registered Consulting Arbor ist No. 602, the subject scope of work does not include cutting to ma intain or aid its health, balance, structure, or to maintain adequate clearance from existing structures.
2. The condition of the tr ee(s) with respect to di sease, danger of falling, proximity to existing st ructures, high pedestrian tr affic areas such as parking lots, pedestrian walkways, interference with utility services, or is causing or is likely to cause s ubstantial property damage based on sufficient evidence and/or docum entation and said damage cannot be controlled or remedied through r easonable preservation and/or preventive procedures and practices (TOMC Section 9-4.4206(b)(2)).
Per the applicant’s Protected Oak Tree Arborist Report, dated August 22, 2023, and prepared by Evergreen Arborist Consultants, Inc., Michael Green, Registered Consulting Arbor ist No. 602, the subject scope of work does not include of removal or cutting of trees ex clusively for the purpose of removing a condition hazardous to existing development as the site is vacant. However, 1 tree is identified in poor condition (Coast Live Oak #97) and located immediately next to the public right-of-way, and 2 of the trees to be removed are noted to be dead (Coast Live Oaks #76 & #79).
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
A City Tree Consultant has inspec ted the subject protected trees, reviewed the tree report provided by the applicant’s consultant and concurs that the tree impacts are necessary to allow site preparation and grading activities for the building and associated site improvements.
3. A permit may be approved when necessa ry to remove, relocate, cut or encroach into the protected zone of an oak tree to enable the reasonable and conforming use of the subjec t property, which is otherwise prevented by the presence of the tr ee. Reasonable use of the property shall be determined in accordance with the Oak Tree Preservation and Protection Guidelines (TOMC Section 9-4.4206(b)(3)).
The tree removals are necessary to allow site preparation and grading activities for the building and associat ed site improvements. Of the 14 protected trees to be removed:
7, consisting of 5 trees locat ed along Los Padres Drive (Coast Live Oaks #29, #31, #32, & #33; Holly Oak #30) and 2 located within the southern portion of the site (Valley Oak #34; Coast Live Oak #35), are within an area to be graded for parking and circulation improvements. If t hese trees were not removed, the project would not comply with parking or circulation requirements. 5 are located within the drive ai sle of the buildi ng (Coast Live Oaks #77, #78, #80, #81, & #82), a nd are to be removed for the project to comply with circulation requirements.
2 are located along Rolling Oaks Drive (Holly Oak #96; Coast Live Oak #97) within an area to be gr aded for drive aisle or utility improvements.
The City’s Oak Tree Consultant took into consideration the feasibility of transplanting the oak trees appr oved for removal; however, transplanting was not recommended for th is specific project due to the significant root loss that would occur to these trees, sloping topography, and the uncertainty that the trees will survive even if appropriate care is taken during the pre- and post-transplanting process.
The City’s Tree Consultant has ins pected the subject protected trees, independently reviewed the tree r eport provided by the applicant’s consultant and concurs that the tree impacts are necessary to allow site preparation and grading activities for the building and associated site improvements.
4. Approval of the request is not contra ry to or in conflict with the general purpose and intent of this chapter (TOMC Section 9-4.4206(b)(4)).
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
As described above in SECTION 3 (2022-70587-LU) Finding 2, the whole of the project has been found to be consistent with the 2045 General Plan and TOMC, and those fi ndings are incorporated by reference into this finding. Therefore, the project is consistent with the goals and policies of the City’s General Plan.
The approval of this request will not be contrary to or in conflict with the general purpose and intent of the Oak Tree Ordinance, Landmark Tree Ordinance or the Oak Tree Preser vation and Protection Guidelines (Res. No. 2010-014) as the 14 remo vals are necessary to allow reasonable use of the property and as the project has been conditioned to replace each oak tree approved for removal with two (2) 24” box oak trees and one (1) 36” box oak tree in compliance with the City's Oak Tree Preservation and Protection Guidelines.
In this case, the removal of 14 protected oak trees results in the project being conditioned to plant 42 oak trees, consisting of 26 24-inch box size and 16 36-inch box size oak trees, on site. The landscape plan identifies a total of 45 coast live oak and valley oak trees to be planted on the project site exceeding the required number of replacement trees.
Further, replacement trees have been st rategically located around the perimeter of the subject property in order to pr ovide a physical barrier between the residential structures and surrounding roadways. Such placement would provide visual screening to and from the roadways and reduce noise entering the site. Therefore, the City Council supports the replacement tree layout.
If, during Building Safety review or construction it is determined that any of the replacement trees are unable to be located on site, the Community Development Director may approve plantin g of the trees at an off-site location for public benefit or provi de and in-lieu cash payment to the City's Open Space Conservation Fund used toward acquisition of open space, as prescribed by Resolution 2010-014.
5. The project has been reviewed in conformance with the provisions of the California Environmental Quality Act.
The Protected Tree Permit has been reviewed for conformance with the provisions of the California En vironmental Quality Act. For this application, the City is the Lead Agency and, on behalf of the Applicant, the City Council certifies the Final EIR that was prepared for the project.
The Final EIR identifies where all ar eas listed as potentially significant have been mitigated to levels that are no longer significant, through the
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
inclusion of mitigation measures, wh ich the applicant shall comply with under the conditions of approval.
NOW, THEREFORE, BE IT RESOLVED that based on substantial evidence contained within the record, the analysis in the staff report, t he Findings of Fact available in the Final EI R, and, having considered th e Final EIR and associated MMRP, the City Council adopts and certifie s the Final Environmental Impact Report 2022-70775-EIR prepared for the project and approves 2022-70587-LU, 2022-70732-DP, 2022-70736-PMW, and 2022 -70735-PTP, subject to conformance with the conditions set fo rth and attached hereto and made a part hereof. Except as otherwise expressly indi cated, said conditions shall be fully performed and completed, or at the City’s discretion, shall be secured by bank or cash deposit or other security satisfactory to the City Attorney before the use or occupancy of the property is commenced and before a Certificate of Occupancy is issued. The violation of any of the conditions of said permit shall be grounds for revocation by the Commission or City Council.
PASSED AND ADOPTED this 26
th day of March 2024, by the following vote:
AYES:
NOES:
ABSENT:
Al Adam, Mayor
City of Thousand Oaks City Council
ATTEST/CERTIFY:
Laura B. Maguire, City Clerk
Date Attested: ___________________
APPROVED AS TO FORM:
Office of the City Attorney
__
Patrick J. Hehir, Chief Assistant City Attorney
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
APPROVED AS TO ADMINISTRATION:
Andrew P. Powers, City Manager
The presence of electronic signature certifies that the foregoing is a true and correct copy as approved by the City of Thousand Oaks City Council on the date cited above.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587- LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
GENERAL
1. Approval Inclusion – This approval, in its entirety as adopted, shall be included in the initial plan- check submittal that is submitted to the Building Safety Division. The approval and c onditions shall be copied directly onto plan sheets and included as part of the project plans throughout the plan- check process and shall be part of the project plans for which building permits are issued.
2. Condition Compliance – The conditions set forth in this Resolution shall run with the land and shall remain in forc e for the duration of the life of the Project. All conditions of 2022-70587- LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, and 2022-70735-PTP, and any other modification shall apply to this approval, unless otherwise modified herein.
3. Compliance with Applicable La ws, Rules, and Regulations – The applicant shall comply with any and all local, city, county, state and federal laws, regulations and orders now in effect or which may hereafter be enacted pertaining to the approved medical office building or affecting the installation, operation or maintenance of said facility. Violation of any of those laws in connection with the use authorized herein will be cause for initiation of revocation proceedings.
4. Regulatory Agency Approval – The requirements of all applicable regulatory agencies shall be met and approval obtained prior to issuance of an occupancy permit. Copies of all r equired licenses shall be submitted to the Community Development Department.
5. Dedications/Reservations/Fees and Public Improvements – With respect to fees, dedica tions, reservations and construction of public improvements as requir ed by the project development conditions, the applicant is advised pursuant to Gove rnment Code Secti on 66020, that a 90-day protest period has commenced upon approval of the development conditions by the City.
6. Payment of Fees – Approval is subject to the applicant paying all fees and assessments to the City of Thous and Oaks, School District, Conejo Recreation and Parks District, Ventura County Fire Prevention District, and any other agency requiring fees relat ed to the subject development as required by the Municipal Code and established by City Council.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
7. Non-residential Development Linkage Fee – Prior to the issuance of any building permits, the applicant sha ll pay the required Nonresidential Development Linkage Fee for the projec t pursuant to Section 9-10.409 of the Municipal Code per the linkage fee rate established by the City Council Resolution in effect at the time.
8. City / County / Agency / Other Fees – All Police, Fire Department, School District Fees and any other fees i dentified in the St andard Conditions, Resolution No. 95-20, shall be paid pr ior to the issuance of any building permits. Notification in writing by these agencies confirming payment shall be submitted to the Community Development Department.
9. Acknowledgment – The applicant acknowledges that all aspects of this project are of special concern to and regulated by the City of Thousand Oaks, which has established specific criteria and sta ndards concerning development within the City. Any changes, modifications, or alterations to improvements on the subject property shall first be approved by the City of Thousand Oaks. Any unauthorized changes may require future corrective work and may result in a City Code compliance effort.
10. Signed Acceptance of Conditions – A signed Acceptance of Conditions affidavit shall be executed by the applicant and property owner, or their duly authorized representative, and shall be returned to the Planning Division of the Community Development Department prior to the issuance of a grading and building permit associated with 2022-70732-DP, 2022-70736-PMW, and 2022-70735-PTP.
11. Authorized Project Changes/Modifications – Minor changes to 2022- 70732-DP, 2022-70736-PMW, and 2022-707 35-PTP may be approved by the Community Development Depar tment through the appropriate entitlement process provided such changes achieve substantially the same results and the project is still in compliance with all applicable development standards in the Thousand Oaks Municipal Code. Revised plans reflecting the minor changes and additi onal fees shall be requi red. Any substantial changes will require the filing of a major modification application.
12. Unauthorized Changes – The applicant acknowled ges that the exterior treatment, location of structures and architectural features of the development are of s pecial concern to, and r egulated by, the City of Thousand Oaks, which has establish ed criteria and standar ds concerning development within the City. Any subs tantial change, modification, or alteration to the architectural design, or in the exterior treatment of any building and structure, including bu ilding colors, materials, changes in walkways, doorway, window locations, or in the parking, landscaping and COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
other related features, must first be approved by the City of Thousand Oaks prior to performing the work. Unauthorized change(s) or failure to comply with the conditions of this permit may require future corrective work and result in a City Code violation and appropriate action.
13. Indemnification – The applicant shall defend, indemnify, and hold harmless the City, its agents, official s, and employees from any claim, action, or proceeding against the City or its agents, officials or employees that is brought to attack, set aside, void, or annul an approval of the City issued as related to the project for which the applicant is applying. The City shall promptly notify the applicant of any such claim, action, or proceeding and the City shall cooperate fully in the defense.
14. Condition Execution – Compliance with and execution of all conditions listed herein shall be necessary prior to obtaining final building inspection clearance and/or prior to obtaining any occupancy clearance, unless stated otherwise herein. Deviat ion from this requirement shall be permitted only by written consent of the Community Development Director or designee.
15. Occupancy – No final inspection or occupancy permit shall be granted until construction and landscaping are complete in accordance with the approved plans and the conditions, per phase, required herein.
ENVIRONMENTAL FEES
16. Fish and Wildlife Fee and County Filing Fee – On the basis of the evaluation of the Initial Study prepared by the lead agency under the provision set forth in the CEQA Gui delines Section 15063, it is hereby declared that there is evidence before the agency that the project will have the potential for an adverse effect on wildlife resources, as defined in Section 711.2 of the Fish and Game Code. Therefore, the applicant shall submit to the City, applicable filing fees (“Environmental Impact Report” and “County documentary handling fee” pay able to Ventura County in conjunction with the filing of a Notice of Determination for the project.
ENVIRONMENTAL MITIGATION MEASURES
17. (M) Mitigation Compliance – Applicant agrees to comply with all mitigation measures outlined in Environmental Impact Report No. 2022- 70775-EIR. Prior to the issuance of any grading or building permit, the applicant shall submit a written report demonstrati ng that all mitigation measures imposed by the City to ei ther reduce or avoid significant environmental impacts identified in t he Environmental Impact Report have COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
either been incorporated in the project design or undertaken as required.
Final determination of compliance with imposed mitigation measures pursuant to the requirem ents of Section 21081.6 of the Public Resources Code shall in turn be subject to the review and approval of the Community Development Department.
BIOLOGICAL RESOURCES
18. (M) MM-BIO-1: Coastal California Gnatcatcher Protocol Survey and Permitting (Cancer Center site). Prior to the issuance of a grading permit for the project, the applicant will retain a FESA section 10(a)(1)(A)-permitted biologist to conduct a protocol level survey for the coastal California gnatcatcher. The surveys will be c onducted per the USFWS protocols (USFWS 1997) and will be conducted duri ng the breeding season of the species (March 15 through June 30). Six surveys will all be conducted at least one week apart within the suitabl e habitat on the Project site. The adjacent private parcels will be surv eyed from the Project site using binoculars. Results of the surveys will be submitted in a report to the USFWS and City. If the results of the survey are negative for coastal California gnatcatcher, then the suitabl e habitat on the Project site is considered not occupied and no further mitigation regarding the species is required.
Compensatory Habitat Mitigation: If coastal California gnatcatcher is found to be occupying the suitable habitat on site, then the applicant will consult with the USFWS on the need for permitt ing for the species under FESA.
The Project does not have a federal nexus (i.e., impacts to waters of the U.S.), so it is expected that Sect ion 10 of FESA would be the permitting pathway and an HCP would need to be developed. The 1.78 acres of suitable habitat (coastal sage scrub) will require a minimum of 1:1 replacement of in-kind habitat that is occupied by the species in the vicinity of the Project site. Since there ar e no available mitigation banks in the Project vicinity, a City-approved property containing at least 1.78 acres of suitable coastal California gnatcatcher habitat would be purchased within the Conejo Valley. The property w ould have a conservation easement placed on it, with the Cone jo Open Space Conservation Agency or similar entity holding the conservation easem ent. The applicant would fund an endowment for the management of t he property in perpetuity. The establishment of the conservati on area is expected to be done in conjunction with the HCP process with USFWS, bot h of which must be completed prior to issuance of a grading permit for the Project.
Nesting Season Avoidance: If coastal California gnatcatcher is found to be occupying the suitable habitat on site, then all vegetation removal must COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
occur from July 1 to March 14 to avoid the direct take of nests with eggs or young.
19. MM-BIO-2 Biological Monitoring (Cancer Center site). Prior to the issuance of a grading permit, the Applicant shall submit the qualifications of potential Biological Monitor(s) to t he City for review and approval. The Applicant shall then retain the Cit y-approve Biological Monitor(s) during Project construction to monitor construction activities and to ensure compliance with all mitigation measures . The Biological Monitor shall be present on site during all vegetation removal and each day prior to the commencement of grading activities. The Biological Monitor shall be responsible for conducting a pre-cons truction clearance survey and any wildlife (common or specia l-status) shall be relocated to City-approved areas. Pre-construction clearance su rveys shall be conducted prior to construction of each new phase of the development. The Biological Monitor shall monitor to ensure that wildlife do not become entrapped in excavation or trenching areas. Safeguards s hall be implemented during daytime periods of non-activity and overnight, su ch as a placing a platform over trenches, flush with the ground surface; installing escape ramps in trenches; or installing exclusionary fencing. Should relocation of any trapped wildlife be required, construction shall be halted until the Biological Monitor arrives on site and clears the work area (in co mpliance with all applicable permits and authorizations).
Daily monitoring reports shall be prepared by the Biological Monitor that at a minimum document the results of any surveys conducted, wildlife relocations, construction activities performed, compliance issues observed, corrective actions taken, and include photos. The monitoring reports shall be made available to the City Community Development Department.
20. MM-BIO-3 Nesting Birds (Cancer Cent er site and Janss Road site).
Project construction shall be conduct ed in compliance with the conditions set forth in the Migratory Bird Treat y Act and California Fish and Game Code with methods approved by the Ca lifornia Department of Fish and Wildlife to protect acti ve bird/raptor nests. Vegetation removal shall occur during the non-breeding season for nesting birds (generally late September to early March) and nesting raptors (generally early July to late January) to avoid impacts to nesting birds and raptors. However, if the Project requires that work be initiated during the breeding season for nesting birds (March 1–September 30) and nesting raptors (February 1–June 30), in order to avoid direct impacts on active nests, a pre-construction survey shall be conducted by a City-approv ed Biologist for nesting birds and/or raptors within 3 days prior to clearing or disturbance of any vegetation. The survey will be conducted within 300 f eet for nesting birds and within 500 feet for COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
nesting raptors and coastal California gnatcatcher. If the Biologist does not find any active nests within or immediately adjacent to the impact areas, the vegetation clearing/construction work shall be allowed to proceed. If the City-approved Biologist finds an active nest within or immediately adjacent to the construction area and determines that the nest may be impacted or breeding activities substantially disr upted, the Biologist shall delineate an appropriate buffer zone around the nest depending on the sensitivity of the species and the nature of the construction activi ty. Any nest found during survey efforts shall be mapped on the construction plans, which will be included in the report(s) documenting the survey(s) that will be submitted to the City within three days of the completion of the survey. The active nest shall be protected until nesting activity has ended. To protect any nest site, the following restrictions to construc tion activities shall be required until nests are no longer active, as dete rmined by the City-approved Biologist:
(1) clearing limits shall be establis hed within a buffer around any occupied nest (the buffer shall be 100–300 feet for nesting birds and 300–500 feet for nesting raptors and California gnatcatcher), unless otherwise determined by a qualified Biologist and (2) acce ss and surveying shall be restricted within the buffer of any occupied nest, unless otherwise determined by the City-approved Biologist. Encroachment into the buffer area around a known nest shall only be allowed if the Biol ogist determines that the proposed activity would not disturb the nest occupants. Construction can proceed when the Biologist has determined that fledglings have left the nest, or the nest has failed.
21. MM-BIO-4 Bat Roost Avoidance (Can cer Center site and Janss Road site). Prior to the issuance of a grading permit, the Applicant shall submit the qualifications of the biologist(s) to the City for review and approval. The City-approved biologist shall conduc t a pre-construction bat habitat assessment of mature trees marked for potential removal. Potential for roosting shall be categorized by 1) pot ential for solitary roost sites, 2) potential for colonial roost sites (10 bats or more). If the potential for colonial roosting is determined, those trees shall not be removed during the bat maternity roost season (March 1 – July 31). Trees potentially supporting colonial roosts outside of maternit y roost season, and trees potentially supporting solitary roosts may be removed via a two-step removal process, whereby some level of disturbance (such as trimming of lower branches) (at the direction of the City-approved biologist) is applied to the tree on day one to allow bats to escape during the darker hours, and the roost tree shall be removed two days later (i.e., ther e shall be no less or more than two nights between initial disturbance and the grading or tree removal). The trees will be dropped slowly under the supervision of the City-approved biologist and documented in the Biological Monitor’s daily monitoring report (see MM-BIO-2).
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
22. MM-BIO-5 Crotch Bumble Bee Pre-Construction Surveys. A pre- construction survey for Crotch bumble bee shall be conducted within the construction footprint prior to the start of ground-disturbing construction activities occurring during the Crotch bumble bee nesting period (February 1 through October 31). The survey sha ll ensure that no nests for Crotch bumble bee are located wit hin the construction area. The pre-construction survey shall include 1) a habitat asse ssment and 2) focused surveys, both of which will be based on recommendat ions described in the “Survey Considerations for California En dangered Species Act (CESA) Candidate Bumble Bee Species,” released by the California Department of Fish and Wildlife (CDFW) on June 6, 2023, or the most current at the time of construction.
The habitat assessment shall, at a minimum, include historical and current species occurrences; document potential habitat on site including foraging, nesting, and/or overwintering resource s; and identify which plant species are present. For the purposes of this mitigation m easure, nest resources are defined as abandoned small mammal burrows, bunch grasses with a duff layer, thatch, hollow trees, brush piles, and man-made structures that may support bumble bee colonies such as rock walls, rubble, and furniture.
The habitat assessment will be repeated prior to February 1 in each year ground-disturbing activities will occur to determine if nesting resources are present within the impact area. If nesti ng resources are present in the impact area, focused surveys will be conducted.
The focused survey will be performed by a biologist with expertise in surveying for bumble bees and include at least three (3) survey passes that are not on sequential days or in the sa me week, preferably spaced two to four weeks apart. The timing of these surveys shall coincide with the Colony Active Period (April 1 through August 31 for Crotch bumble bee). Surveys may occur between 1 hours after s unrise and 2 hours before sunset.
Surveys will not be conducted during wet conditions (e.g., foggy, raining, or drizzling) and surveyors will wait at least 1 hour following rain. Optimal surveys are when there are sunny to partly sunny skies that are greater than 60° Fahrenheit. Surveys may be cond ucted earlier if other bees or butterflies are flying. Surveys shall not be conducted when it is windy (i.e., sustained winds greater than 8 mph). Within non-developed habitats, the biologist shall look for nest resources suitable for bumble bee use. Ensuring that all nest resources receive 100% visual coverage, the biologist shall watch the nest resources for up to fi ve minutes, looking for exiting or entering worker bumble bees. Worker bees should arrive and exit an active nest site with frequency, such that t heir presence would be apparent after five minutes of observation. If a bumbl e bee worker is detected, then a COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
representative shall be identified to s pecies. Biologists should be able to view several burrows at one time to sufficiently determine if bees are entering/exiting them depending on their proximity to one another. It is up to the discretion of the biologist regarding the actual survey viewshed limits from the chosen vantage point which would provide 100% visual coverage; this could include a 30- to 50-foot-wi de area. If a nest is suspected, the surveyor can block the entrance of the possible nest with a sterile vial or jar until nest activity is confirmed (no longer than 30 minutes).
Identification will include trained bi ologists netting/capturing the representative bumble bee in appropriate insect nets, per the protocol in U.S. National Protocol Framework for the Inventory and Monitoring of Bees.
The bee shall be placed in a clear container for observation and photographic documentation if able. The bee will be photographed using a macro lens from various angles to ens ure recordation of key identifying characteristics. If bumble bee ident ifying characteristics cannot be adequately captured in the container due to movement, the container will be placed in a cooler with ice until the bumble bee becomes inactive (generally within 15 minutes). Once inert, the bumble bee shall be removed from the container and placed on a white sheet of paper or card for examination and photographi c documentation. The bumble bee shall be released into the same area from which it was captured upon completion of identification. Based on implementation of this method on a variety of other bumble bee species, they become active shortly after removal from the cold environment, so photography must be performed quickly.
If Crotch bumble bee nests are not detected, no further mitigation would be required. The mere presence of fo raging Crotch bumble bees would not require implementation of additional minimization measures because they can forage up to 10 kilometers from their nests. If nest resources occupied by Crotch bumble bee are detected within the construction area, no construction activities shall occur within 100 feet of the nest, or as determined by a qualified biologi st through evaluation of topographic features or distribution of floral resources. The nest resources will be avoided for the duration of the Crotch bumble bee nesting period (February 1 through October 31). Outside of the nesting season, it is assumed that no live individuals would be present wit hin the nest as the daughter queens (gynes) usually leave by September, and all other individuals (original queen, workers, males) die. The gyne is highly mobile and can independently disperse to outside of the construction footprint to surrounding open space areas that support suitable hibernacula resources.
A written survey report will be submi tted to the City and CDFW within 30 days of the pre-construction survey. The report will include survey methods, COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
weather conditions, and survey results, including a list of insect species observed and a figure showing the locations of any Crotch bumble bee nest sites or individuals observed. The survey report will include the qualifications/resumes of the surveyor(s) and approved biologist(s) for identification of photo vouchers, detailed habi tat assessment, and photo vouchers. If Crotch bumble bee nests are observed, the survey report will also include recommendations for av oidance, and the location information will be submitted to the California Na tural Diversity Database (CNDDB) at the time of, or prior to, submittal of the survey report.
If the above measures are followed, it is assumed that the project shall not need to obtain authorization from CDFW through the California Endangered Species Act Incidental Take Permit pr ocess. If the nest resources cannot be avoided, as outlined in this measur e, the project applicant will consult with CDFW regarding the need to obtain an Incidental Take Permit. Any measures determined to be necessary through the Incidental Take Permit process to offset impacts to Crot ch bumble bee may supersede measures provided in this CEQA document and shall be incorporated into the habitat mitigation and monitoring plan.
In the event an Incidental Take Pe rmit is needed, mitigation for direct impacts to Crotch bumble bee will be fulfilled through compensatory mitigation at a minimum 1:1 nesting habi tat replacement of equal or better functions and values to those impact ed by the project, or as otherwise determined through the Incidental Take Permit process. Mitigation will be accomplished either through off-site conservation or through a CDFW- approved mitigation bank. If mitigation is not purchased through a mitigation bank, and lands are conserved separately, a cost estimate will be prepared to estimate the initial start- up costs and ongoing annual costs of management activities for the managem ent of the conservation easement area(s) in perpetuity. The funding source will be in the form of an endowment to help the qualified natural lands management entity that is ultimately selected to hold the cons ervation easement(s). The endowment amount will be established following the completion of a project-specific Property Analysis Record to calculat e the costs of in -perpetuity land management. The Property Analysis Record will consider all management activities required in the Incidental Take Permit to fulfill the requirements of the conservation easement(s), which are currently in review and development.
23. MM-BIO-6 Least Bell’s Vireo Focused Survey (Cancer Center site). A City-approved Biologist shall conduct two focused surveys for least Bell’s vireo no earlier than 3 days prior to the beginning of grading or any other type of ground disturbance. The results of the survey shall be submitted to COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
the City prior to commencement of work . If any least Bell’s vireo nests are found, the Biologist shall implement a default 500-foot minimum avoidance buffer. The breeding habitat/nest site shall be fenced and/or flagged in all directions. The nest will be monitored by the Designated Biologist, who will monitor the noise level generated by cons truction activities at the 500-foot avoidance buffer limits for one hour. If the noise level exceeds 60 dBA Leq1 at 500 feet from the active nest, the buffer will be expanded until the dBA falls below that level. This area shall not be disturbed until the nest becomes inactive, the young have fledged, the young are no longer being fed by the parents, the young have left the ar ea, and the young will no longer be impacted by the project, as determined by the Biologist. If a lapse in project- related work of 5 days or longer o ccurs, another survey shall be required before project work can be reinitiated with the results submitted to the City.
24. MM-BIO-7 Demarcation of Disturban ce Limits (Cancer Center site).
Prior to commencement of earth work for each phase of Project construction, the construction limits shall be clearly demarcated (e.g., installation of flagging or temporary high visibility construction fence), as recommended by the City-approved Biologi cal Monitor. All construction activities including equipment staging and maintenance shall be conducted within the marked disturbance limits to prevent inadvertent disturbance to sensitive vegetation communities outsi de the limits of work. The flagging shall be maintained throughout construction.
25. MM-BIO-8 Invasive Species Prevention (Cancer Center site). The Project shall not include invasive plant species listed in the California Invasive Plant Council (Cal-IPC) invent ory in project landscaping palettes.
Project landscape palettes shall be reviewed and approved by the Community Development Director or their designee to ensure that invasive plant species are excluded. In addition, to prevent the spread of invasive plant species during construction and until the establishment of common landscaped areas associated with the project, the following measures shall be implemented:
a. A Workers Environmental Awar eness Training (WEAT) program will be prepared that will include invasive species prevention measure implemented by the project. The WEAT will include descriptions of the common invasive plants known in the region. The WEAT will also include descriptions of sensitive resources known to occur in the Project site and the procedures to follow should a sensitive resource be encountered.
b. All mobile vehicles and constr uction equipment shall be washed prior to entering the Project site in an upland location where any seed material from invasive species will be contained and not carried onto COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
the Project site. Logs of the washing will be submitted monthly to the City.
c. Following the completi on of grading activities, for those areas of the Project site that are graded but not yet developed/landscaped, the City-approved Biological Monitor shall conduct monthly spot checks to prevent the introduction or establishment of invasive plant species onto the graded areas (see MM BIO- 4). If invasive species are identified, the Biological Monitor shall remove the plants with hand tools or weeding equipment to prevent propagation.
d. All vegetative material removed fr om the Project Footprint shall be transported in a covered vehicle and will be disposed of at a certified disposal site.
26. MM-BIO-9 Landscaping Plan (Cancer Center site). Prior to the issuance of the first grading permi t, the Applicant shall prepare a landscaping plan submit the landscaping plan to t he City for review and approval. The landscaping plan shall include, but not be limited to, the following:
a. Plant species list shall include sci entific name, common name, plant container size, and quantities.
b. Invasive plant species (designated by the California Invasive Plant Council) shall not be included in t he landscaping plan as they could establish off-site and have negative impacts to the adjacent habitats. c. Non-native milkweeds shall not be included in the landscaping plan as they could establish off-si te and have negative impacts to the adjacent habitats.
d. Plant layout shall indicate the location of the plant species. e. Planting notes shall include i rrigation and plant installation requirements such as mulch requirements.
f. Where native species are required, the species shall be regionally appropriate native species of the region (locally indigenous native species).
27. MM-BIO-10 Oak Tree Removal and Replacement (Cancer Center site and Janss Road site). A total of 28 24-inch box size and 17 36-inch box size oak trees shall be planted and depicted on the landscape architect’s planting plan. If different sized oak trees are proposed for installation or an alternate mitigation site is identifi ed, the proposed size, quantity, and site shall be approved by the City of Thousand Oaks Community Development Director. Trees shall be installed per ISA tree planting specifications under the direction and supervisi on of an ISA Certified Ar borist. Installed trees shall be monitored by an ISA Certified Arborist for the first 5 years after installation. The ISA Certified Arbor ist shall submit an annual report documenting tree species, diamet er, height above grade, measured COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
dripline, appearance and health conditions, physical description, and photographs of each tree.
28. MM-BIO-11 Tree Protection Prior to Construction (Cancer Center site and Janss Road site). An ISA Certified Arborist shall be retained to oversee implementation of the following:
a. Fencing: All remaining trees that will not be relocated or removed shall be preserved and protec ted in place. Trees within approximately 15 feet of proposed c onstruction activity shall be temporarily fenced with chain link or other material satisfactory to City planning staff throughout gradi ng and construction activities.
The fencing shall be installed 5 feet outside of the dripline of each tree (or edge of canopy for cluster of trees), be 4 feet tall, and staked every 6 feet. For trees located south of the project site and within 15 feet of construction limits, fencing may be installed closer to the trees and within the tree protection zone (TPZ) for trees that are otherwise protected by the existing retaining wall to the south of the project site.
The fenced area shall be consider ed the TPZ unless proximate construction requires temporary removal.
b. Flagging: Above ground tree parts that could be damaged by construction equipment (e.g., low limbs, trunks) shall be flagged with red ribbon prior to the start of construction.
c. Pre-Construction Meeting: A pre-construction meeting shall be held between all contractors (including grading, tree
removal/pruning, builders) and the ISA Certified Arborist. The ISA Certified Arborist shall instruct the contractors on tree protection practices and answer any questions. All equipment operators and spotters, assistants, or those di recting operators from the ground, shall provide written acknowledgem ent of their receiving tree protection training. This training shall include information on the location and marking of protected trees, the necessity of preventing damage, and the discussion of work practices that will accomplish such.
29. MM-BIO-12 Tree Protection and Main tenance During Construction (Cancer Center site and Janss Road site). An International Society of Arboriculture (ISA) Cert ified Arborist shall be retained to oversee implementation of the following:
a. Equipment Operation and Storage: Heavy equipment operation and storage shall be avoide d tree protection zone (TPZ). Operating heavy machinery around the root z ones of trees will increase soil compaction, which decreases soil aeration and subsequently reduces water penetration in t he soil. All heavy equipment and vehicles shall, at minimum, stay out of the fenced TPZ, unless where COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
specifically approved in writing and under the supervision of an ISA Certified Arborist or as provided by the approved landscape plan. b. Storage and Disposal: Do not store or discard any supply or material, including paint, lumber, c oncrete overflow, etc. within the tree protection zone. Remove all foreign debris within the tree protection zone; it is im portant to leave the du ff, mulch, chips, and leaves around the retained trees fo r water retention and nutrients.
Avoid draining or leakage of equi pment fluids near retained trees.
Fluids such as gasoline, dies el, oils, hydraulics, brake and transmission fluids, paint, paint thi nners, and glycol (anti-freeze) shall be disposed of properly. K eep equipment parked at least 50 feet away from retained trees to avoid the possibility of leakage of equipment fluids into the soil. The effect of toxic equipment fluids on the retained trees could lead to decline and death.
c. Grade Changes: Grade changes, including adding fill, are not permitted within the TPZ without special wri tten authorization and under the supervision of an ISA Certified Arborist or as provided by the approved landscape plan. Lowering the grade within this area will necessitate cutting main support and feeder roots, jeopardizing the health and structural in tegrity of the tree(s). Adding soil, even temporarily, on top of the existing grade will compact the soil further and decrease both water and air availability to the trees’ roots. d. Moving Construction Materials: Above ground tree parts that could be damaged (e.g., low limbs, trunks) shall be flagged with red ribbon prior to the start of construction, per MM-BIO-3. If contact with the tree crown is unav oidable, the conflicti ng branch(es) shall be pruned using ISA standards under the direction and supervision of an ISA Certified Arborist.
e. Root Pruning: Except where specifically approved in writing, all trenching shall be outside of the f enced tree protection zone. Roots primarily extend in a horizontal direction forming a support base to the tree similar to the base of a wineglass. Wher e trenching is necessary in areas that contain tree roots, roots shall be pruned the roots using a Dosko root pruner or equivalent and under the direction and supervision of an ISA Certified Arborist. All cuts shall be clean and sharp, to minimize ripping, tear ing, and fracturing of the root system. The trench shall be made no deeper than necessary. f. Irrigation: In the event that root pruning is necessary, trees that have been substantially root pruned (30% or more of their root zone) will require irrigation for the first 12 mont hs. The first irrigation shall be within 48 hours of root pruning. They shall be deep watered every 2 to 4 weeks during the summer and once a month during the winter (adjust accordingly with rainfall). One irrigation cycle shall thoroughly soak the root zones of the trees to a depth of 3 feet. The soil shall COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
dry out between watering; avoid keeping a consistently wet soil.
Designate one person to be responsible for irrigating (deep watering) the trees. Check soil moisture wit h a soil probe before irrigating.
Irrigation is best accomplished by installing a temporary above ground micro-spray system that will distribute water slowly (to avoid runoff) and evenly throughout the f enced protection zone but never soaking the area located within 6 f eet of the tree tr unk, especially during warmer months.
g. Pruning: Trees shall not be pruned until all construction is completed. This will help protect the tree canopies from damage. All pruning shall be completed under the direction of an ISA Certified Arborist and using ISA guidelines. Only dead wood shall be removed from tree canopies.
h. Washing: During construction in summer and autumn months, wash foliage of trees adjacent to the construction sites with a strong water stream every two weeks in early hours before 10:00 a.m. to control mite and insect populations.
i. Inspection: An ISA Certified Arborist shall inspect the 26 preserved trees on a monthly basis during construction. A report comparing tree health and condition to the original , pre-construction baseline shall be submitted following each in spection. Photographs of representative trees are to be in cluded in the report on a minimum annual basis.
30. MM-BIO-13 Tree Maintenance After C onstruction (Cancer Center site and Janss Road site). Once construction is complete the fencing may be removed, and the following measures shall be performed to sustain and enhance the vigor of the preserved trees:
a. Mulch: Provide a 4-inch mulch laye r under the canopy of trees.
Mulch shall include clean, organic mulch that will provide long-term soil conditioning, soil moisture retention, and soil temperature control. b. Pruning: The trees will not require regular pruning. Pruning shall only be done to maintain clearan ce and remove broken, dead, or diseased branches. Pruning shall only take place following a recommendation by an ISA Certif ied Arborist and performed under the supervision of an ISA Certified Arborist. No more than 20% of the canopy shall be removed at any one time. All pruning shall conform to ISA standards.
c. Watering: The natural trees t hat are not disturbed shall not require regular irrigation, other than the 12 months following substantial root pruning. However, soil probing shall be necessary to accurately monitor moisture levels. Especially in years with low winter rainfall, supplemental irrigation for the trees that sustained root pruning and COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
any newly planted trees may be necessary. The trees shall be irrigated only during the winter and spring months.
d. Watering Adjacent Plant Material: All plants near the trees shall be compatible with water requirement s of said trees. The surrounding plants shall be watered infrequently with deep soaks and allowed to dry out in-between, rather than frequent light irrigation. The soil shall not be allowed to become saturated or stay continually wet. Irrigation spray shall not hit the trunk of any tree. A 60-inch dry-zone shall be maintained around all tree trunks. An aboveground micro-spray irrigation system is recommended over typical underground pop-up sprays.
e. Washing: Periodic washing of the fo liage is recommended during construction but no more than once every 2 weeks. Washing shall include the upper and lower leaf su rfaces and the tree bark. This shall continue beyond the construction period at a less frequent rate with a high-powered hose only in the early morning hours. Washing will help control dirt/dust buildup that can lead to mite and insect infestations.
f. Spraying: If the trees are maintained in a healthy state, regular spraying for insect or disease co ntrol shall not be necessary. If a problem does develop, an ISA Certif ied Arborist shall be consulted; the trees may require application of insecticides to prevent the intrusion of bark-boring beetles and other invading pests. All chemical spraying shall be performed by a licensed applicator under the direction of a licensed pest control advisor.
g. Inspection: All trees that were impacted during construction within the TPZ shall be monitored by an ISA Certified Arborist for the first 5 years after construction completion. The ISA Certified Arborist shall submit an annual report, photograph each tree, and compare tree health and condition to the original, pre-construction baseline.
CULTURAL RESOURCES
31. MM-CUL-1 Worker Environmental Awareness Program (WEAP). Prior to the start of construction activities, all construction personnel and monitors shall be trained regarding identification and treatment protocol for inadvertent discoveries of cultural resources (archaeological and tribal) and human remains. A basic presentation and handout or pamphlet shall be prepared in order to ensure proper identification and treatment of inadvertent discoveries of cultural resources and human remains. The purpose of the Workers Environm ental Awareness Program (WEAP) training is to provide specific details on the kinds of materials that may be identified during ground disturbing acti vities and explain the importance of and legal basis for the protection of human remains and significant cultural COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
resources. Each worker shall also be trained in the proper procedures to follow in the event that cultural resources or human remains are uncovered during ground disturbing activities. T hese procedures include but are not limited to work curtailment or redirection, and the immediate contact of the site supervisor and archaeological monitoring staff. WEAP attendance requirement shall be stated on all Project site plans intended for use by those conducting the ground disturbing activities.
32. MM-CUL-2 Retention of an On-C all Qualified Archaeologist. Prior to commencement of any grading activi ty on-site, the Applicant and/or subsequent responsible parties sha ll retain a Qualified Archaeologist, meeting the Secretary of the Interi or’s Standards, and with experience in California prehistoric and historic resources (experience within Project area preferred), to complete the followi ng: compose a Cultural Resource Discovery Management Plan (Plan), re spond to inadvertent discoveries identified during project implem entation, and manage archaeological monitoring if required. The purpose of the Plan is to outline a program of treatment and mitigation in the case of an inadvertent discovery of cultural resources during ground-disturbing phas es and to provide for the proper identification, evaluation, treatment, and protection of any cultural resources in accordance with CEQA throughout the duration of the Project. Existence and importance of adherence to this Plan shall be stated on all Project site plans intended for use by those conducting the ground disturbing activities.
33. MM-CUL-3 Inadvertent Discovery Clause. In the event that potential archaeological resources (sites, features , or artifacts) are exposed during ground disturbing, all construction work occurring not less than 50 feet of a cultural resource discovery and 100 feet of a human remains discovery shall immediately stop and the qualified archaeologist that has been retained on call must be notified immediately to assess the significance of the find and determine whether or not additional study is warranted. Depending upon the significance of the find under the CEQA, the archaeologist may simply record the find and allow work to continue. If the discovery proves significant under CEQA, additional work (e.g., pr eparation of an archaeological treatment plan, testing, data recovery, or monitoring) may be warranted if the resource cannot be feasibly avoi ded. If the discove red archaeological resource is determined to be Native American in origin, the Tribe/s traditionally and culturally affiliated with geographic area of the project site shall be contacted.
In the event that human remains ar e inadvertently encountered during construction activities, the remain s and associated resources shall be treated in accordance with state and local regulations that provide requirements regarding the discovery of human remains, including COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
California Health and Safety C ode Section 7050.5, California Public Resources Code Section 5097.98, and CEQA Guidelines Section 15064.5(e). In accordance with these r egulations, if human remains are found, the County Co roner must be immediately notified of the discovery.
No further excavation or disturbance of the Project site or any nearby (no less than 100 feet) area reasonably sus pected to overlie adjacent remains can occur until the County Coroner has determined if the remains are potentially human in origin. If the County Coroner determines that the remains are, or are believed to be, Na tive American, he or she is required to notify the NAHC that shall notify those persons believed to be the most likely descendant. The most likely descendant shall determine, in consultation with the property owner, the disposition of the human remains.
Existence and importance of adherence to this clause shall be stated on all Project site plans intended for use by those conducting the ground disturbing activities.
34. NOTE: These measures have been dev eloped to mitigate any potential impacts to unknown archaeological resour ces, as previously defined, or human remains within the Cancer Center site. As previously mentioned, since the current Project does not include any ground disturbance within the Janss Road site, there are no impacts anticipated to result from current Project implementation. However, if a future project proposed on the Janss Road site includes ground disturbance, subsurface testing would be required to determine whether the re source extends into the Janss Road site, meets the criteria of a historical resource or unique archaeological site pursuant to CEQA Guidelines Sect ion 15064.5 or demonstrates evidence or potential evidence of the pres ence of human remains and either archaeological resources, as previous defined, or human remains have the potential to be impacted.
35. MM-CUL-4 Paleontological Resour ces Impact Mitigation Program (PRIMP). Prior to commencement of any grading activity on-site, the applicant shall retain a qualified paleontologist per the Society of Vertebrate Paleontology (SVP) (2010) guidelines. The paleontologist shall prepare a Paleontological Resources Impact Mitigation Program (PRIMP) for the Project. The PRIMP shall be consistent with the SVP (2010) guidelines and should outline requirement s for preconstruction meeting attendance and worker environmental awareness traini ng, where monitoring is required within the Project site based on c onstruction plans and/or geotechnical reports, procedures for adequate paleontological monitoring and discoveries treatment, and paleontologi cal methods (including sediment sampling for microvertebrate foss ils), reporting, and collections management. The PRIMP shall also include a statement that any fossil lab or curation costs (if necessary due to fossil recovery) are the responsibility COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
of the Project applicant or proponent. The qualified paleontologist shall attend the preconstruction meeting and a qualified paleontological monitor shall be on-site during all rough gr ading and other significant ground- disturbing activities (including auger ing) in previously undisturbed, fine- grained Pleistocene alluvial deposits. In the event that paleontological resources (e.g., fossils) are unearthed during grading, the paleontological monitor will temporarily halt and/or divert grading activity to allow recovery of paleontological resources. The area of discovery will be roped off with a 50-foot radius buffer. Once document ation and collection of the find is completed, the monitor will remove the rope and allow grading to recommence in the area of the find.
HAZARDS AND HAZARDOUS MATERIALS
36. MM-HAZ-1 Phase I Environmental Si te Assessment (ESA) for Janss Road site. A Phase I ESA shall be conducted in accordance with ASTM Standard E-1527-21 (or a more recent version of ASTM E-1527) prior to change of land use or issuance of a dem olition, grading, or building permit where ground disturbance is require d. Recognized environmental conditions identified in the Phase I ESA shall be investigated through completion of a Phase II ESA in accordance with ASTM Standard 1903-19 (or a more recent version of ASTM 1903). The Phase II ESA shall compare sampling results to regulatory screening levels (RWQCB ESLs, EPA RSLs, and DTSC-SLs) based on the proposed land use (i.e., residential, commercial, industrial) as well as construction worker safety requirements.
If concentrations exceed current screening levels, the applicant may be required to provide additional data (i.e., further sample collection) and/or a human health risk assessment to the City to demonstrate protection of human health prior to the issuance of a permit. If concentrations exceed current screening levels or if th e increased human health risk estimate exceeds one in a million, the City s hall consult a regulatory agency (e.g., Ventura County Environmental Health , RWQCB, or DTSC) prior to the issuance of permits to determine an appropriate plan of action for remediation or mitigation related to the potential hazards. Written confirmation from the overseeing regulatory agency shall be provided to the City documenting that the existing env ironmental cont amination will not significantly impact the health and safety of construction workers, adjacent sensitive receptors, future occupants, or future land uses on the site, and that protections or rem ediation completed are adequ ate to ensure future activities and land uses will not be subject to a health risk at the site.
Alternatively, the regulatory agency review may indicate that safety standards cannot be assured, which may result in denial of the permit application.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
NOISE
37. MM-NOI-1 Construction Noise Reduction – Cancer Center site. The following measures shall be implemented by the construction contractor to reduce Project construction noise expos ures as predicted in this EIR and as received by nearest existing off-site residential receptors west and east of the Project site to levels less than 10 dBA over the pre-project outdoor daytime ambient sound environment.
a. The project contractor shall schedule construction phases to avoid concurrent operation of construction equipment from multiple phases at nearest horizontal distances to an off-site noise-sensitive receiver. b. All construction equipment, fixed or mobile, shall be equipped with properly operating and maintained engine exhaust mufflers. c. Based on feasibility and/or practi cality, contractor shall apply the following on-site equipment noise control and sound abatement methods:
i. shutting off idling engines of vehicles and stationary engine- driven equipment when not in use;
ii. orient operating stationary equipment so that audibly or measurably louder cabinet surfac es or penetrations (e.g., air intake or discharge vents) ar e facing away fr om nearest off- site noise-sensitive receptors; and
iii. apply factory-approved enclosu res, vent shrouds, and other equipment-mounted features to attenuate (via dissipative acoustical absorption, south pat h occlusion or redirection, etc.) noise emission.
d. During the site demolition, gradi ng, building construction, and paving phases of the Project, the contractor shall install a minimum 12-foot- tall temporary noise barri er (e.g., vertical in stallation of adjoining plywood sheeting, a frame-suspended outdoor acoustical blanket, or other materials/assembly that de monstrates a minimum of sound transmission class [STC] 25) along an extent of the Project boundary between the construction activity of concern and the off-site noise- sensitive receptor of interest. The barrier shall feature the following:
i. No open gaps between the ground surface and the barrier bottom edge;
ii. No gaps or cracks between adjoi ning vertical barrier element edges (e.g., overlap plywood sheeting or acoustical blanket flaps);
iii. As depicted in Exhibit 4.9-1, the horizontal extent of an installed linear barrier, with a midpoint at a perpendicular distance (PD) from the midpoint of the construction zone width (CZW), should be equal to the width of the construction zone plus four times the perpendicular distance between the noise COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
source and barrier plane (i.e ., linear barrier extent = CZW+4PD). As illustrated in Exhi bit 4.9-2, one or both ends of the barrier may instead be turned inward up to ninety degrees towards the construction zone or noise source,
creating an “L” or “C”-shaped barrier layout with less total length than CZW+4PD, so long as angle “alpha” between the ray connecting the vertical edge position with the construction zone centroid and the plane of the barrier parallel to the construction zone is held constan t. Either barrier layout per this guidance should thus minimize flanking around the
vertical edges and help pr eserve noise reduction
performance.
e. In combination with applicati on of a temporary barrier per MM-NOI- 1-iv, the cumulative hours on site within a typical 8-hour daytime construction period during which an operating piece of construction equipment may operate at the indica ted closest distance to an off- site noise-sensitive receptor shall be limited as follows for each of the four construction phases:
i. Demolition – no more than 5 hours each for the excavator and dozer, operating as close as 75 feet to the nearest off-site noise-sensitive receptor.
ii. Grading – no more than 6 hours each for the excavator, front- end loader, and backhoe, operating as close as 125 feet to the nearest off-site noise-sensit ive receptor; no more than 2 hours each for the dozer and tractor, operating as close as 75 feet to the nearest off-site noise-sensitive receptor.
iii. Building Construction – no limitation on equipment operating hours at the closest di stance of 180 feet to the nearest off-site noise-sensitive receptor.
iv. Paving – no more than 6 hours each for the concrete mixer truck and roller, operating as clos e as 75 feet to the nearest off-site noise-sensitive receptor; no more than 4 hours for the paver operating as close as 75 feet to the nearest off-site noise-sensitive receptor; no more than 7 hours for the front- end loader operating as close as 75 feet to the nearest off-site noise-sensitive receptor.
For the remaining hours of an 8-hour daytime construction work shift, the above-listed equipment may operat e on site but at least three times the indicated distance.
i. At the representative first-day of each project construction phase, or under similar conditions that are indicative of normal on-site construction activity for that phase, a noise level monitor shall be deployed on the receiver side of an installed project on-site temporary noi se barrier to measure and COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
document that off-site noise exposure levels attributed to project construction activity of concern at a sample western and eastern off-site sensitive receptor is in conformance with the 10 dBA increase-over-ambient noise level threshold when compared to a sample measured baseline condition without project construction activity occurring.
The construction noise model prediction worksheets attached herein include predictive sound propagati on calculations for both non- mitigated and mitigation scenarios associated with off-site receptors ST1 and ST2 and present by phase what would be expected to reduce aggregate construction noise le vel (as an 8-hour Leq) to no more than 10 dB greater than t he measured samples of outdoor baseline or pre-project sound envir onment for the western off-site receptors represented by ST1 and ST2 as studied herein. These predictions include incorporati on of mitigation measures as described in MM-NOI-1 above.
38. MM-NOI-2 Construction Noise Reduction – Janss Road site. The following measures shall be implemented by the construction contractor to reduce Project construction noise expos ures as predicted in this EIR and as received by nearest existing off-site residential receptors west and east of the Project site to levels less than 10 dBA over the pre-project outdoor daytime ambient sound environment.
a. The project contractor shall schedule construction phases to avoid concurrent operation of construction equipment from multiple phases at nearest horizontal distances to an off-site noise-sensitive receiver. b. All construction equipment, fixed or mobile, shall be equipped with properly operating and maintained engine exhaust mufflers. c. Based on feasibility and/or practi cality, contractor shall apply the following on-site equipment noise control and sound abatement methods:
i. shutting off idling engines of vehicles and stationary engine- driven equipment when not in use;
ii. orient operating stationary equipment so that audibly or measurably louder cabinet surfac es or penetrations (e.g., air intake or discharge vents) ar e facing away fr om nearest off- site noise-sensitive receptors; and
iii. apply factory-approved enclosu res, vent shrouds, and other equipment-mounted features to attenuate (via dissipative acoustical absorption, south pat h occlusion or redirection, etc.) noise emission.
d. During the site demolition, gradi ng, building construction, and paving phases of the Project, the contractor shall install a minimum 8-foot- tall temporary noise barri er (e.g., vertical in stallation of adjoining COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
plywood sheeting, a frame-suspended outdoor acoustical blanket, or other materials/assembly that de monstrates a minimum of sound transmission class [STC] 20) along an extent of the Project boundary between the construction activity of concern and the off-site noise- sensitive receptor of interest. The barrier shall feature the following:
i. No open gaps between the ground surface and the barrier bottom edge;
ii. No gaps or cracks between adjoi ning vertical barrier element edges (e.g., overlap plywood sheeting or acoustical blanket flaps);
iii. As depicted in Exhibit 4.9-1, the horizontal extent of an installed linear barrier, with a midpoint at a perpendicular distance (PD) from the midpoint of the construction zone width (CZW), should be equal to the width of the construction zone plus four times the perpendicular distance between the noise source and barrier plane (i.e ., linear barrier extent = CZW+4PD). As illustrated in Exhi bit 4.9-2, one or both ends of the barrier may instead be turned inward up to ninety degrees towards the construction zone or noise source,
creating an “L” or “C”-shaped barrier layout with less total length than CZW+4PD, so long as angle “alpha” between the ray connecting the vertical edge position with the construction zone centroid and the plane of the barrier parallel to the construction zone is held constan t. Either barrier layout per this guidance should thus minimize flanking around the
vertical edges and help preserve noise reduction performance. e. At the representative first-day of each project construction phase, or under similar conditions that are indicative of normal on-site construction activity for that phase , a noise level monitor shall be deployed on the receiver side of an installed project on-site temporary noise barrier to measure and document that off-site noise exposure levels attributed to project construction activity of concern at a sample western and eastern off- site sensitive receptor is in conformance with the 10 dBA increase-over-ambient noise level threshold when compared to a sample measured baseline condition without project construction activity occurring.
The construction noise model predi ction worksheets attached herein include predictive sound propagati on calculations for both non-mitigated and mitigation scenarios associated with off-site receptor ST4 and present by phase what would be expected to reduce aggregate construction noise level (as an 8-hour Leq) to no more than 10 dB greater than the measured samples of outdoor baseline or pre- project sound environment for the off- site receptor represented by ST4 sout h of Janss Road as studied herein.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
These predictions include incorporat ion of mitigation measures as described in MM-NOI-1 above.
39. MM-NOI-3 Mechanical Equipment Noise Abatement. Because heating, ventilation, and air conditioning (HVAC) equipment can generate noise that could affect surrounding sensitive receptors and because the details, specifications, and locations of this equipment is not yet known, the project applicant shall retain an acoustical specialist to review project construction- level plans prior to final approval to ensure that the equipment specifications and plans for HVAC and other outdoor mechanical equipment incorporate measures, such as the specification of quieter equipment or provision of acoustical enclosures, that will not exceed relevant noise standards at nearby noise-sensitive land uses (e.g., residential). Prior to the commencement of construction, the ac oustical specialist shall certify in writing to the City that the equipment specifications and plans incorporate measures that will achieve the relevant noise limits.
WILDFIRE
40. MM-WF-1 Pre-Construction Requirements. Vegetation management shall be conducted prior to the star t of construction and throughout all construction phases. Existing flammabl e vegetation shall be reduced by 50% on vacant portions of the pr oject site upon commencement of construction. Firebreaks and fuel m odification shall be implemented in accordance with Appendix J, Fire Protection Plan, and approved by VCFD.
Prior to bringing lumber or combus tible materials onto the site, site improvements within the active develop ment area shall be in place, including utilities, operable fire hydrants, an approved, temporary roadway surface, and fuel modification zones established. These features shall be approved by VCFD prior to combustibles being brought on site.
To limit the risk of fire ignitions, t he Project shall comply with the following risk reducing measures:
a. All new power lines shall be und erground for fire safety. Temporary construction power lines may be a llowed in areas that have been cleared of combustible vegetation.
b. No Smoking will be allowed on site except in designated safe smoking areas which include cl eared area with no combustible vegetation or materials and approved butt receptacles
(noncombustible containment of cigarette butts).
c. Minimize combustible and flamm able materials storage on site. d. Store any combustible or flammabl e materials that need to be on site away from ignition sources and native vegetation.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
e. Parking areas shall be cleared of all grass and brush by a distance of at least 10 feet.
f. Keep evacuation routes free of obstructions.
g. Label all containers of potentially hazardous materials with their contents and stored in the same location as flammable or combustible liquids.
h. Perform “hot work” according to fire safe practices in a controlled environment and with fire suppression equipment at the job site. A fire watch person (Fire Patrol), with extinguishing capability (e.g., fire extinguishers), should be in place for all ‘Hot Work” activities during construction. Ensure hot work adheres to the guidelines provided. i. Dispose of combustible waste pr omptly and according to applicable laws and regulations.
j. Report and repair all fuel leaks without delay.
k. Extension cords shall not be re lied on if wiring improvements are needed, and overloading of circuits with multiple pieces of equipment shall be prohibited.
l. Turn off and unplug electrical equipment when not in use. m. Direct contractors on site to re strict use of chainsaws, chippers, vegetation masticators, grinders, drill rigs, tractors, torches, and explosives to outside during Red Flag Warnings. When the above tools and equipment are used, wate r trucks (4,000-gallon capacity) equipped with hoses, shovels, Pu laski’s, and McLeod’s shall easily be accessible to personnel.
n. When an evacuation has been called, all site personnel will gather at the designated assembly area and the Site Safety Officer will account for all personnel. Once all personnel are accounted for, the vehicles will safely convoy from the site to safe zones, which are generally areas off-site away from the threat.
o. Contractor shall monitor for er osion, document issues, and take corrective actions to minimize erosion during vegetation removal.
Construction crew members and c ontractors shall use caution to avoid causing erosion or ground (including slope) instability or water runoff due to vegetation remo val, vegetation management, maintenance, landscaping, or irrigation. Standard federal, state, and local regulations for erosion control and erosion control best practices shall be implemented.
41. MM-WF-2. A Fully Irrigated Landscape, Planted with Drought-tolerant, Fire-resistive Plants. A fully irrigated landscape, planted with drought- tolerant, fire-resistive plants shall be implemented in accordance with VCFD Fire Hazard Reduction Program Plant Reference Guide. No undesirable, highly flammable plant species shall be planted, as listed in the VCFD Prohibited Plant List. The landscapi ng shall be routinely maintained and COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
shall be watered by an automatic irrigation system that will maintain healthy vegetation with high moisture contents that would minimize ignition by embers from a wildfire. The landscape plan shall be submitted to VCFD for review and approval before construction may commence.
42. MM-WF-3. Building Materials. The east side of the proposed structure, which achieves up to approximately 85 feet of on-site fuel modification and is adjacent to naturally vegetated open space areas, shall be constructed with code exceeding dual pane dual tempered glass windows. The east side of the proposed structure shall also include 5/8-inch Type X fire rated gypsum sheathing applied behind the exterior covering or cladding (stucco or exterior siding) on the exterior side of the framing, from the foundation to the roof for a facade facing the open space and naturally vegetated areas. 5/8-inch Type X fire rated gypsum sheathing is required to be manufactured in accordance with established ASTM standards defining type X wallboard sheathing as that which provides not less than one-hour fire resistance when evaluated in specified building assemblies and has been tested and certified as acceptable for use in a one-hour fire rated system. CertainTeed Type X Gypsum Board has a Flame Spread rating of 15 and Smoke Developed rating of 0, in accordance with ASTM E 84, (U L 723, UBC 8-1, NFPA 255, CAN/ULC-S102);UL classified for Fire Resistance (ANSL/UL 263; ASTM E119) and listed under UL File No. CKNX.R3660 (Certainteed, 2021).
MITIGATION MONITORING PLAN
43. Mitigation Monitoring Program – The Mitigation M onitoring Program in the Final Environmental Impact Report (2022-70775-EI R) is hereby adopted. Prior to the i ssuance of a grading permit, the applicant shall submit a written report demonstrating that all mitigation measures imposed by the City to either reduce or avoi d significant environmental impacts identified in the Final Environm ental Impact Report have either been incorporated in the project desig n or have been or will be undertaken as required. Final determination of compliance with imposed mitigation measures pursuant to the requirement s of Section 21081.6 of the Public Resource Code shall in turn be subjec t to the review and approval of the Community Development Department.
44. Mitigation Compliance – Prior to the issuance of any building permit, the applicant shall submit a written report demonstrati ng that all mitigation measures imposed by the City to ei ther reduce or avoid significant environmental impacts identified in Final Environmental Impact Report (2022-70775-EIR) have either been incorporated in the project design or undertaken as required. Final dete rmination of compliance with imposed COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70587-LU, 2022-70733-Z, 2022-70732-DP, 2022-70736-PMW, AND 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
mitigation measures pursuant to the requirements of Section 21081.6 of the Public Resources Code shall in turn be subject to the review and approval of the Community Development Department.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
GENERAL
45. Land and Application – The Development Permi t is adopted, granted or accepted for the land described in the appl ication, any attachment thereto, and as shown on the submitted “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission st aff report dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024, pursuant to the following conditions.
46. Scope of Permit Approval – the demolition of a ll improvements on the property and construction of an appr oximately 58,412 square foot (sf) medical office building that accomm odates various cancer medical and patient services. The building height would range between 27 feet and 44 feet 2 inches at its highest point. Primary access would be off Rolling Oaks Drive and secondary access off Los Padres Drive with parking provided on the property. The project also includes the installation of hardscape, landscape, utilities, and associated grading on slopes steeper than 25 percent. The Project shall be constructed substantially as shown on project plans labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission staff report dat ed March 11, 2024, and attached to the City Council staff report dated March 26, 2024, unless conditioned otherwise herein.
47. Approval Period/Use Inauguration – The Development Permit is granted for a three (3) year period of time from City Council final project effectuation (30 days after the Zone Change 2022-70733-Z’s second reading) ending May 9, 2027, at which time said permit shall expire unless the use authorized herein has been inaugurat ed in accordance with Section 9-
4.2812(c) of the Thousand Oaks Munici pal Code. The applicant may request time extensions of this period as permissible by Section 9-4.2812(e) of the Thousand Oaks Municipal Code by filing a Minor Modification application prior to the expiration date.
48. Final Plans – Prior to the issuance of a build ing permit, final site, grading, floor, elevation and roof plans shall be submitted for the review and approval of the Community Development Departm ent. Said plans shall incorporate any design change and other requirement as conditioned herein.
OPERATIONAL RESTRICTIONS
49. Medical Services – The primary use of the building is permitted for medical services including, but are not lim ited to, radiation oncology, medical oncology, surgical oncology, radiology and imaging services, as well as COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
patient-centric services including a nurse navigator, genetic counseling, emotional counseling, financial support, and immune therapy.
50. Hours of Operation – The project shall be limited to customer service operations between the hours of 8:00 A.M. to 5:00 P.M. Monday through Sunday. Medical staff without patients being present may work on the property outside these hours.
51. Delivery Hours – All deliveries shall take place between the hours of 8:00 A.M. to 5:00 P.M. Monday through Friday.
52. Interior Activities – All use activities shall occur within the interior of the building.
GRADING
53. APCD Permit – The applicant shall obtain all necessary clearances from the Air Pollution Control District (APCD) prior to beginning any grading on- site. Verification shall also be provided to the City.
54. Dust Prevention – In order to prevent excessive amounts of fugitive dust, all materials excavated (on-site) shall be controlled for with Ventura County Air Pollution Control District methods, which includes adherence to Rule 50 (Opacity) that sets opac ity standards on the discharge from sources of air contaminants. This rule would apply during construction of the proposed project, specifically grading activities, Rule 55 (Fugitive Dust) that requires dust generators to implement control m easures to limit the amount of dust from vehicle track-out, earth movi ng, bulk material handling, and truck hauling activities, and Rule 55.2 (Street Sweeping Equipment) that requires the use of PM10 efficient street sw eepers for routine street sweeping and for removing vehicle track-out pursuant to Rule 55.
The project is to comply with the City of Thousand Oaks Water Conservation Ordinance R equirements. Level 4 Co nservation Measures prohibit potable water use for dust suppression unless approved through a City waiver. For more information see:
https://www.toakswater.org/conservationstages
55. Project Grading – All gradients within the parking lot shall comply with the provisions of Section 9-4.2405(a) of the Thousand Oaks Municipal Code, unless otherwise authorized herein. All parking lot areas shall have a maximum gradient slope of 2.5% and parking spaces shall have a maximum cross-slope of 2%. Access driveways se rving the site shall be limited to a maximum seven percent (7%) gradient with approved transitions. Deviation COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
from these requirements shall be permi tted only by written consent of the Community Development Director and Public Works Director or designees.
56. Final Detailed Grading, Paving and Drainage Plan Submittal – Prior to issuance of a grading permit, a final detailed grading, paving and drainage plan demonstrating compliance with a ll imposed conditions of this Development Permit shall be submitt ed for review and approval by the Community Development and Public Works Departments
57. Exporting/Importing Earth Materials – Any exporting or importing of earth material and debris shall be authorized by permit issued by the Public Works Department. The builder sha ll comply with an approved identified haul route to and from the project and s hall coordinate the hauling of this material with the Public Works and Community Development Departments to minimize traffic disruptions and di sturbances to the project area. The exporting and importing of any earth ma terials to new sites within the jurisdiction of the City of Thousand Oaks shall be subject to the review and approval by the Planning Commission un less such sites have previously been approved for development with an active entitlement, and said grading is in accordance with Public Wor ks Department approved plan for the project.
58. Grading Adjacent to Public Streets (Resolution No. 79-270) Compliance - All grading adjacent to Rolling Oaks Drive and Los Padres Drive shall be designed in compliance with Resolution No. 79-270 and Resolution 91-172, and shall be cons tructed substantially as shown on project plans labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission staff r eport dated March 11, 2024, and attached to the City Council sta ff report dated March 26, 2024, unless conditioned otherwise herein.
59. Grading Within 25% Slope Terrain – Grading encroachment within twenty-five percent (25%) and steeper sl oping terrain is permitted only to satisfy California Building Code requi rements for building wall setback as depicted and as shown on project plans labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission staff report dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024, unless conditioned otherwise herein.
60. Manufactured Slope Height – No manufactured slope shall exceed twenty-five (25') feet in height. Prior to the issuance of a grading permit a final grading plan shall be submitted for review reflecting compliance with this requirement.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
61. Rounded Manufactured Slopes/Contoured Grading Techniques – All manufactured slopes shall include rounded top sections and shall incorporate contour grading techniques to blend with the adjacent terrain, except where slopes terminate into retaining walls.
62. Manufactured Slope Landscaping – In accordance with the City’s Grading Ordinance, all manufactured slopes shall be landscaped with drought resistant native plant materi als including tree clusters and ground cover and provided with a permanent i rrigation system throughout. The landscaping and an irrigation system shall be installed within six (6) months following the completion of grading. Pr ior to issuance of a grading permit, landscaping and irrigation plans shall be submitted for the review and approval of the Community Development Department.
63. Certified As-Built Grading – Prior to issuance of a building permit, a rough grading completion certification on the City standard form shall be prepared and signed by the applicant’s Civil Engineering consultant and submitted to the Public Works Department. Said cert ificate shall state that the graded pad design and pad elevations are cons istent with the pad elevation and grading details shown in the grading plan/attachments dated February 29, 2024, attached to the Planning Commi ssion staff report dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024.
64. Utility Lines – All new utility service to the site shall be installed underground.
BUILDING SETBACKS
65. Building Setbacks – All building setbacks shall be provided as depicted on the Exhibits, labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission staff r eport dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024.
DEVELOPMENT
STANDARD (C-O) REQUIRED PROPOSED COMPLIES
Setbacks (ft.)
Front Setback (north
– along Rolling Oaks
Drive)
A minimum
setback of 20
feet from the
property line
adjacent to a
street.
Front = ~100 feet from
the property line along
Rolling Oaks Drive to the
closest corner
(northwest) of the
proposed buildin
g.
Yes
Front Setback (west
– along Los Padres
Drive)
A minimum
setback of 20
feet from the
property line
Front = ~90 feet from the
property line along Los
Padres Drive to the
closest corner
Yes
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
adjacent to a
street.
(southwest) of the
proposed building.
Side Setback (east) 5 feet, except 30
feet when
abutting R zone.
Side = ~85 feet from the
eastern property line.
Yes
Rear Setback (south) 20 feet minimum
from the rear
property lines.
Rear = ~180 feet from
the nearest rear property
line to the closest corner
(southeast) of the
proposed buildin
g.
Yes
BUILDING HEIGHT
66. Building Height – As measured from the bui lding’s finished floor, the maximum building height shall not exc eed 44’ 2”, as shown in the exhibits labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission staff report dat ed March 11, 2024, and attached to the City Council staff report dated March 26, 2024.
ARCHITECTURAL DESIGN
67. Architectural Building Design – The architectural design depicted in the attachments labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission staff r eport dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024, are approved in concept. Prior to the issuance of a building permit, fully dimensioned and detailed architectural drawings sha ll be submitted for review and approval by the Community Development Department, with all elevations coordinated with color, materials, and architectural form to achieve design harmony and continuity.
68. Building Wall Treatment – The building walls shall incorporate architectural treatment to create a visually interesting appearance as viewed from the surrounding properties and scenic corridors. The treatment shall include, but is not limited to, incorporating decorative finish materials, vertical and horizontal variation, and recessed storefront and window glazing. The design shall comply with the building elevation plans as shown in the exhibits labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission staff r eport dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024.
69. Window Recess – Windows must be recessed at a minimum depth of at least three inches (3”) from glass face to wall edge around the windows if there is no trim.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
70. Window Divided-Lites/Mullions – Divided-lite windows, where utilized, must consist of true/full divided-lites or simulated divided-lites, in accordance with the following standards:
a. Muntins or grids must project at least three-eighths of an inch (3/8") from the glass surface.
b. Muntins or grids must be used on both the exterior and interior of the glass. c. For simulated divided-lites, spacers must be used between panes.
71. Window Materials – Windows frames must be made of aluminum, fiberglass, wood, or manufactured w ood; or another material with a wood grain texture finish.
72. Window Glazing – Opaque, spandrel, reflec tive, and mirrored window glazing is prohibited, except as shown on project plans labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission staff report dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024.
73. Window Shutters – Shutters, where utilized, must be proportionately sized to the height and width of the window. Shutter materials must be consistent with the project’s exterior building co lors/materials and not be of a faux material.
74. Exterior Building Colors and Materials – All exterior materials and colors depicted on the attachments labeled “Project Plan Set” dated February 29, 2024, attached to the Planning Commi ssion staff report dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024, are approved in concept only. Prior to the issuance of a grading permit, a final color and materials sample board, including, but not limited to, specific materials and paint manufacturer colors, shall be submitted for review and approval by the Community Development Department. The applicant shall indicate the type of fi nish on the revised plans and materials and colors sample board. The following materials and colors are approved in concept, unless otherwise noted:
a. Concrete Masonry Unit (CMU)
i. CMU-1:
1. Manufacturer: Or co - or approved equal
2. Product Series: 3” Veneer System ORCO Burnished
Veneer
3. Color: Wheat MW w/ BC
4. Location: Building Columns Base
ii. CMU-2:
1. Manufacturer: Or co - or approved equal
2. Product Series: 3” Veneer System ORCO Burnished
Veneer
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
3. Color: Wheat MW w/ BC
4. Location: Building Columns Base
b. Exterior Walls (EIFS & DEFS)
i. EIFS-1: EIFS System:
1. Manufacturer: Dr yvit - or approved equal
2. Product Series: Outsulation Plus MD System
3. Color: Match 472ST Captain, Pastel; Base, Stratatone
4. Texture: Sandblast NTX
5. Sealant Color: Match EIFS
ii. EIFS-2: EIFS System:
1. Manufacturer: Dr yvit - or approved equal
2. Product Series: Outsulation Plus MD System
3. Color: Match 105 Suede
4. Texture: Sandblast NTX
5. Sealant Color: Match EIFS
iii. DEFS-1: Direct Applied EIFS System:
1. Manufacturer: Dr yvit - or approved equal
2. Product Series: Cement Board MD
3. Color: Match EIFS-1
4. Texture: Match EIFS-1
5. Location: Exterior ceiling
c. Thermal/Moisture Protection (JS & MTL)
i. JS-1: Joint Sealant:
1. Manufacturer: Dow Corning - or approved equal
2. Product Series: Dowsil 758 Silicone Weather Barrier
Sealant
3. Color: Match EIFS-1
4. Location: Varies
ii. MTL-1: Metal Column Cover:
1. Manufacturer: Cent ria - or approved equal
2. Product Series: Column Cover 3000
3. Color: 154 Dark Bronze
4. Location: Canopy Columns
iii. MTL-2A: Metal Wood-look Beams:
1. Manufacturer: Armstr ong - or approved equal
2. Product Series: Custom Exterior Aluminum Vertical
Beam
3. Color: Match WDC-2
4. Location: Exterior decorative wood-look beams at patio iv. MTL-2B: Metal Wood-look Beams:
1. Manufacturer: Armstr ong - or approved equal
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
2. Product Series: Custom Exterior Aluminum Vertical
Beam
3. Color: Match WDC-2
4. Location: Exterior decorat ive wood-look beams at roof v. MTL-2C: Metal Wood-look Beams:
1. Manufacturer: Armstr ong - or approved equal
2. Product Series: Custom Exterior Aluminum Vertical
Beam
3. Color: Match WDC-2
4. Location: Exterior dec orative wood-look beams W-
flange cladding
d. Finishes – Exterior Paint (XPT)
i. XPT-1
1. Manufacturer: Sherwin -Williams - or approved equal
2. Product Series: Coating System
3. Color: Match AMF-2
4. Location: Exterior HM metal doors
ii. XPT-2
1. Manufacturer: Sherwin -Williams - or approved equal
2. Product Series: Coating System
3. Color: Match AMF-2
4. Location: Gate
iii. XPT-3
1. Manufacturer: Sherwin -Williams - or approved equal
2. Product Series: Sherwin-Williams
3. Color: Match WDC-2
4. Location: Trash Enclosure Wood
e. Architectural Metal Finishes – (AMF)
i. AMF-1
1. Manufacturer: Sherwin -Williams - or approved equal
2. Product Series: Coating System
3. Color: 399C9041, 439Z 8466M Coil, Fluropon Classic
II, Wells Bronze
4. Location: Infill Metal Pane l, HM Coatings, Sheet Metal Flashing
ii. AMF-2
1. Manufacturer: Sherwin -Williams - or approved equal
2. Product Series: Coating System
3. Color: 399D0329, Fluropon Classic II, Anodized Wells Bronze
4. Location: Punched Wi ndows, Curtain Wall Window
Mullions Railings
iii. AMF-20
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
1. Manufacturer: Sherwin -Williams - or approved equal
2. Product Series: Sherwin-Williams
3. Color: SW6255 Morning Fog
4. Location: Shadow Boxes
f. Decorative Wall Tile – (DWT)
i. DWT-1
1. Manufacturer: Dalt ile - or approved equal
2. Product Series: Artcrafted Gazed Ceramic, 4x4
3. Color: Cotto AC27 – V3
4. Location: Decorative Exterior Wall Accent
g. Metal Fabrication – Railings (R)
i. R-1
1. Manufacturer: Kane Innovations - or approved equal
2. Product Series: Contemporary Picket
3. Color: Match AMF-2
4. Location: Patio Guardrails
ii. R-2
1. Manufacturer: Kane Innovations - or approved equal
2. Product Series: Contemporary Picket
3. Color: Match AMF-2
4. Location: Site Stairs with handrails
iii. R-2
1. Manufacturer: Kane Innovations - or approved equal
2. Product Series: Contemporary Picket Face Mounted
3. Color: Match AMF-2
4. Location: Juliet Balcony Guardrail
h. Openings – Glazing (AGS, CMP & GL)
i. AGS-1: Aluminum Glazing System
1. Manufacturer: Kaw neer - or approved equal
2. Product Series: 1600 Wall
3. Color: AMF-02
4. Location: Aluminum Fr amed Storefront Entrances
ii. AGS-10: Aluminum Glazing System
1. Manufacturer: Kaw neer - or approved equal
2. Product Series: 2250 IG
3. Color: AMF-02
4. Location: Aluminum Framed Window
iii. GL-1: Glazing
1. Manufacturer: Vi tro - or approved equal
2. Product Series: Solarban 90 Starphire
3. Color: Vision
4. Location: Exterior Glazing
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
iv. GL-2: Glazing
1. Manufacturer: Vi tro - or approved equal
2. Product Series: Solarban 90 Starphire with Shadow
Box
3. Color: Vision, Metal color AMF-20
4. Location: Exterior Glazing
v. CMP-1: Composite Metal Panel
1. Manufacturer: Kaw neer - or approved equal
2. Product Series: Skimcoat Plaster
3. Color: AMF-1
4. Location: Infill Metal P anel within aluminum framed system Glazing
i. Openings – Wall Louvers (WL)
i. WL-1
1. Manufacturer: Airo lite - or approved equal
2. Product Series: SCH401
3. Color: Match AMF-2
4. Location: Lourvers in PVC parapet
ii. WL-2
1. Manufacturer: Airo lite - or approved equal
2. Product Series: K6772
3. Color: Match DEFS-1
4. Location: Lourvers in soffits
j. Exterior Porcelain Flooring (PP & XPFT)
i. PP-1: Exterior Porcelain Pavers
1. Manufacturer: Tile Tech - or approved equal
2. Product Series: Wood Rustic Series
3. Color: Rustic Gray
4. Location: Roof Garden
ii. XPFT-1: Exterior Porcelain Floor Tile
1. Manufacturer: Americ an Clean - or approved equal
2. Product Series: Minimum
3. Color: Textured Finish for Exterior Use
4. Location: Exterior Ceramic Tile Floor
iii. XPFT-2: Exterior Porcelain Floor Tile
1. Manufacturer: Dalt ile - or approved equal
2. Product Series: Emerson Wood EP06
3. Color: Herringbone Pattern; Install, Exterior Stepwise Technology
4. Location: Exterior Ceramic Tile Inset
k. Roof (RT)
i. RT-1: Roof Tile
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
1. Manufacturer: Gladding McBean & Co.
2. Product Series: Cordova
3. Color: Blended Red
4. Location: Clay Roof Tile
75. Architectural Design Guidelines – All applicable provis ions of the City’s Design Guidelines for Construction and Development of Residential, Industrial, and Institutional Projects (Resolution No. 2023-061) shall be applicable to this project.
76. Roof Overhangs – When roof overhangs are provided, the roof overhangs must have a minimum depth of at least two (2’) feet. This does not apply to the shed roof covering the walkway on the west, north, and east elevation.
77. Final Floor Plans – The project is approved in concept only with respect to the building floor plans for the building. Prior to the issuance of a building permit, detailed floor plans shall be subm itted for review and approval by the Community Development Department.
78. Medical Office Building Common Amenities – Prior to issuance of a building permit, the applicant shall s ubmit to the Comm unity Development Department a common area amenities plan which specifies the amenities, including but not limited to seating, which are to be found within common areas adjacent to the building for the exclusive use by employees and guests.
79. Emergency Exit/Service Doors – All exterior emergency exit and service doors as viewed from public streets shall be decorative and located in recessed vestibules of sufficient dept h to accommodate the installation of overhead recessed security light fixtur es. Other doors not viewed from public streets or publicly accessib le open space may be illuminated by either the same method or by the installation of decorative architectural light fixtures. Said doors shall be operat ed from the inside with appropriate approved hardware and shall be alarmed. No exposed hardware including door latches shall be permitted on the ex terior surface of any door. Any access from the exterior shall be lim ited to key activated hardware locks only. All such doors shall be painted or treated a color to match the adjacent exterior finish of the building or as approved herein. Design and location of all doors shall be subject to revi ew and approval by the Community Development and Police Departments.
80. Flat Roof Areas – The flat roof areas and par apet walls exposed to view from surrounding areas shall be color-coded to blend with the exterior building wall color subject to the re view and approval of the Community Development Department.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
81. Roof Access – Access to the roof shall be internalized and shall be secured with appropriate hatches and locked at a ll times when not in use. Design, location, and security requirements of said access shall be subject to approval of the Community Development and Police Departments.
SCREENING
82. Screening – All exterior trash, recycling, storage utility boxes, service poles, ventilation systems, electric and gas meters, fire sprinkler valves, backflow preventers, generators, and transformers must be screened from public view either with landscaping, fencing or integrated into the design of the primary of accessory structure.
83. Downspouts – The downspouts on the exteri or of the buildings shall be concealed within the building walls subject to the review and approval of the Community Development Department.
84. Roof-Mounted Mechanical Equipment – All roof-mounted mechanical equipment, including air conditioning, roof fans and any similar equipment, shall be located within t he mechanical equipment enclosures or obscured by roofing elements as depicted on “Project Plan Set,” dated February 29, 2024, attached to the Planning Commi ssion staff report dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024.
Prior to issuance of building permits, a complete study of the roof-mounted equipment shall be conducted to dem onstrate that all roof-mounted equipment will be screened by the building parapet as seen from within the public right-of-way at Rolling Oaks Drive’s northern edge, Los Padres Drive’s western edge, and Highway 101. Final detailed cross-section drawings, studies, equipm ent manufacturer’s catalogue cuts, brochures, specifications and specific exhibits and roof equipment locations shall be submitted for the review and approv al of the Community Development Department.
85. Surface-Mounted Mechanical Equipment – All surface-mounted mechanical equipment, including trans formers, terminal boxes or meter cabinets, shall be screened from public view by landscaping or decorative enclosure to match the materials and colors of the new building, subject to review and approval by the Communi ty Development and Public Works Departments.
86. Backflow Device – Any proposed backflow device shall be screened from public view by landscaping and or solid fencing or walls, subject to review and approval by the Community Development and Public Works Departments.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
87. Exterior Trash Enclosures – Exterior trash enclosures shall consist of solid masonry walls plastered to matc h the building’s exterior with metal gates set in metal frames and shall be protected with a solid overhang roof structure subject to review by the Community Development Department and Public Works Departments. Trash enclo sure areas shall be designed in accordance with the City’s adopted tr ash area design criteria. Trash enclosures will be constructed to have outside visibly to reduce the possibility of camping or sleeping in t he area. Prior to the issuance of a building permit, the developer is to pr ovide a signed letter from the City’s solid waste service provider to the Community Development Director and Public Works Director confirming t he trash enclosure has been designed consistent with the City’s solid waste service provider’s operational needs.
Prior to the issuance of a buildi ng permit, an additional letter shall be provided by the development’s medica l waste service provider that specifies facilities have been provided to appropriately secure waste affiliated with medical facilitie s and the facilities have been designed consistent with the medical waste service provider’s operational needs.
Prior to the issuance of a building permit, the final design and locations for trash enclosure areas shall be submitted for review and approval by the Community Development and Public Works Departments.
During the project’s operational phase, exterior trash enclosures shall be kept closed and locked during non-business hours to discourage, loitering, illegal dumping and theft.
88. Outside Storage – No outside open storage of any kind shall be permitted on the site, including recycled material s, packaged materials or materials within containers. There shall be no outside containers for the purposes of storing items, such as cargo containers, unless otherwise approved through an evaluation process set by the Co mmunity Development Department Director including any necessary not icing requirements and documents deemed required by the Director.
ACCESS AND CIRCULATION
89. Driveway Access – The site may be served by driveway access off Rolling Oaks Drive (primary access) and Los Padres Drive (secondary access) as shown on the Exhibits labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission st aff report dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024. Said driveways shall be designed in a ccordance with the City’s driveway standards, unless otherwise modified herein.
90. On-Site Traffic Control and Calming – Prior to issuance of any Building Permit, the applicant shall submit a Traffic Control and Traffic Calming plan COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
demonstrating measures within onsite dr ive aisles and circulation areas.
Measures shall include, but not limited to, signs, striping, and speed bumps.
Said measures shall be designed and shown on a signing and striping plan.
The location and type of device(s) shall be designed and installed to the satisfaction of the Community Development and Public Works Directors.
91. Driveway – All driveway areas shall be limited to a maximum fifteen percent (15%) grade and shall be construct ed in accordance with Section 9-
4.2404(c)(1)(v) of the Thousand Oaks Municipal Code and Plate 6-1 of the City’s Road Improvement Standards regarding grade transitions. The drive aisle shall have a minimum pavement wid th as authorized by the Fire Department. The design of the driveway and transitions are subject to review and approval of Community Development and Public Works Departments.
92. Decorative Paving – Decorative paving material such as rock, tiles, pavers or similar patterned material shall comply with ADA and Title 24 disabled access requirements for paths of travel subject to review and approval by the Community Development Department. Decorative paving material shall be provided at driveway entrances. The final design of this decorative paving treatment shall be subject to review and approval by the Community Development Department prior to installation.
93. Decorative Sidewalk Treatment – The use of decorative material such as rock, tiles, pavers or similar patterned material shall be provided at the main pedestrian entrance(s) to the building. The specific material(s) shall comply with ADA and Title 24 disabled access requirements for paths of travel subject to review and approval of the Community Development Department.
PARKING
94. Required Parking – A minimum of 225 parking spaces shall be provided on the project site based upon the fl oor area uses as indicated in the Exhibits, labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission staff report dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024. A total 233 parking spaces are provided on-site. All parking spaces and driveway aisles shall be designed in accordance with Secti on 9.4-2404 of the Municipal Code.
On-site Electric Vehicle charging parking spaces can be included in the required parking count of the project. Any minor change to parking or future development on the subject property shall be reviewed and evaluated by the Community Development Departm ent. Any substantial change may require the filing of a modification application to be considered by the Planning Commission. Required parking was calculated on the following uses designated for the building.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Use Square Feet Parking Ratio* Required
Parking
Medical,
dental,
surgical and
physical
therapy offices
44,811 SF
(Net)
58,497 SF
(Gross)
1 for every 200 square feet of
gross floor area.3
225
Total Required 225
Total Provided 233
95. Compact Parking – Maximum permitted compact parking spaces shall not exceed twenty-five percent (25%) parking spaces, for a total of 59 compact spaces, based on the total parking requirements as indicated under Section 9-4.2404(d)(1). No overhang compact parking space shall be permitted within five feet (5') of any vertical obstruction.
96. Parking Striping – All parking spaces shall be identified with double four inch (4") wide stripes at sixteen inc hes (16") on center as specified in Section 9-4.2404 (a)(2) of the Municipal Code.
97. Parking Design – Parking stall lengths for stalls that overhang a landscape planter shall be reduced from twenty (20’) feet to a depth of eighteen (18’) feet to allow the remain ing two (2’) feet to be converted to landscaping.
Overhang parking design shall consist of parking stalls measuring eighteen feet (18’) in depth and shall overhang a minimum six foot (6’) wide planter or sidewalk. A width of nine feet (9’) shall be required for all parking spaces.
98. Parking Overhang/Path of Travel – Where parking spaces are located adjacent to a path of travel, the minimum path of travel sidewalk width shall not be less than seven (7’) feet to accommodate a minimum clear sidewalk width of four (4’) feet, allowing three (3’) feet for the parking overhang.
99. Loading Zone – Loading docks are to be provi ded and maintained. Each loading dock shall be prov ided pursuant to TOMC Section 9-4.2405. The loading docks shall provide a total of two loading spaces, and each loading zone shall not be less than 12 feet in width by 50 feet in depth by 14 feet in height.
3 Sec. 9-4.2403(d)(1) New multi-tenant buildings. For the purpose of calculating parking space requirements for multi-tenant nonretail business, professional offices and other similar uses, approved under this Title after August 22, 1997, the square footage described in subsections (26) and (28) of Section 9-4.2402(c) shall mean only the building’s gross leasable floor area. For the purpose of this calculation, “gross leasable floor area” shall mean the area within the total dimensions on each floor as measured from the outside walls, but excluding the in terior common areas used for corridors, lobbies, stairways, common restrooms, elevator or mechanical shafts, and for any unmanned electrical or mechanical rooms. In order to qualify as a “corridor” under this section, the area shall be a shared interior circulation hallway or common walkway feature more than five (5') feet in width with permanent walls on both sides that are constructed from floor to ceiling.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
100. Parking Restrictions – No parking spaces shall be utilized for overnight storage of vehicles. The storage of recreational v ehicles and boats on the subject property is prohibited.
101. Required Bicycle Parking – In accordance with the 2022 California Green Building Standards Code, Section 5.106.4, short-term bicycle parking facilities equivalent to 5% of propos ed vehicle parking and an additional long-term bicycle parking facilities equiva lent to 5% of proposed vehicle parking shall be provided.
The configuration and location of a ll bicycle parking facilities shall be reviewed and approved by the City Planning Division. Bicycle parking area dimensions and location shall be a paved area at least 6’ x 1’ – 6” for each required bicycle parking space. The bicycle parking shall be designed to provide 2 points of contact on the bicycle, be supported upright, and cause no stress onto tires. All provided bicycle parking shall be able to accommodate a standard U-lock.
A. Short-term bicycle parking spaces are to be provided on site near front entrances. Bicycle parking should be located along the natural desire lines of travel from the bikeways to t he facility entrance, in well-lit areas visible from the fr ont entrance and public areas, in a bicycle corral or racks. Bicycle parking shall be located outside of pedestrian walkways, loading areas, landscape planters, etc. Where feasible, bicycle-parking areas should be covered.
B. Long-term bicycle parking spaces sha ll be convenient from the street and shall be provided in one or more of the following configurations:
A. Covered, lockable enclosur es with permanently anchored racks for bicycles;
B. Lockable bicycle rooms with permanently anchored racks; or C. Lockable, permanently anchored bicycle lockers.
C. The applicant shall submit a bi cycle parking plan to be reviewed and approved by the Chief Building Official, Traffi c Engineering representative in the Engineer ing Services Division, and the Community Development Director (or his/her appointee). All bicycle parking shall comply with AASHTO, NACTO, or APBP standards, as permitted by the California Building Code.
Staff shall review all construction documents prior to building permit issuance to ensure that the bicycle rack has been provided and is not in conflict with the applicable development standards for building in the C-O zone.
102. Transportation Demand and Trip Reduction Standards and Measures – A Transportation Demand Management (TDM) program shall be prepared by the property owner and company that will occupy the building. The TDM COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
program shall include, but not be limited to, all of the following standards and measures as required by the T housand Oaks Municipal Code Section 9-4.4003, with an intent to further reduce VMT within the City. Prior to the release of final occupancy permit and subsequent business licenses affiliated with the property, the TDM program must be submitted to the City for review and approval by the Community Development Director and Public Works Director.
The property owner and company that will occupy the building shall jointly provide calculations or informat ion for determining the number of employees expected to work 400 East Rolling Oaks Drive. If the developer is unable to provide sufficient info rmation to accurately determine the expected number of employees, then an estimate shall be made which may be subject to verification by the City at a later date. A typical calculation to estimate the number of employees shall be based on: the number of parking spaces required as determined in Thousand Oaks Municipal Code (TOMC) Section 9-4.2402 title entitled, Parking Space Required; assume one employee per parking space; and the “employee parking area” factors listed under TOMC Section 9-4.4002(i).
Compliance with this criteria shall be provided on the site or floor plans for each entitlement request.
a. Nonresidential devel opment projects capable of holding 50 employees or more shall provide all of the following measures:
i. A bulletin board, display case or kiosk displaying
transportation information located where the greatest number of employees are likely to see it. Information displayed shall include, but is not limited to, the following: current map routes and schedules for public transit routes serving the site; ridesharing promotional materi al supplied by commuter- oriented organizations; tel ephone numbers for referrals on transportation information including numbers for the regional ridesharing agency; Dial-A-Route and local transit operators; bicycle r oute and facility information, including regional and local bicycle maps and bicycle safety
information; and a listing of facilities and services available for carpoolers, vanpoolers, bicyclists, transit riders and
pedestrians at the site.
ii. All proposed public, private streets or driveways that serve as the main access from project build ings to the exterior street system shall include sidewalk fa cilities per City standards for pedestrians and bike routes.
iii. In cases involving multiple tenants, a bulletin board/display case shall be provided by each tenant, or it shall be provided COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
at a common area acceptable to the Public Works and
Community Development Departments.
b. Nonresidential development proj ects capable of holding 100 employees or more shall provide all of the measures required for nonresidential development projects capable of holding 50 employees and all of the following additional measures:
i. Not less than ten percent of “employee parking area” (employee parking area shall be calculated from TOMC
Section 9-4.4002(i) and TOMC Section 9-4.2402) shall be located as close as is practi cal to the employee entrance(s), and shall be reserved for use by carpool/vanpool vehicles, without displacing handicapped and customer parking needs.
This preferential carpool/vanpool parking area shall be identified on the site plan for the applicable entitlement. A statement that pr eferential carpool/vanpool spaces for employees is available and a description of the method for obtaining such spaces must be included on the
required transportation information board. Spaces will be signed and striped. Additional carpool/vanpool spaces shall be provided as demand warrants. The following minimum
spaces shall be provided in any case: at least one space for projects of 50,000 gross square feet to 100,000 gross square feet and two spaces for projec ts over 100,000 gross square feet will be signed and/or stri ped for carpool and/or vanpool vehicles.
ii. Preferential parking spaces re served for vanpools must be accessible to vanpool vehicles. Adequate turning radii for vanpool vehicles shall be provided. Parking space dimensions in vanpool parking areas shall be a minimum nine feet by 20 feet. iii. Bicycle racks or other secure bicycle parking shall be provided near building entrances to accommodate four bicycles per the first 50,000 gross square feet of nonresidential development and one bicycle per each additional 50,000 gross square feet of nonresidential development. Calculations which result in a fraction of 0.5 or higher sha ll be rounded up to the nearest whole number. A bicycle parking facility may also be a fully enclosed space or locker accessible only to the owner or operator of the bicycle, which protects the bike from inclement weather. Specific facilities an d location (e.g., provision of racks, lockers or locked bike room) shall be per the
requirements of the Publ ic Works and Community
Development Departments imposed as conditions on each
entitlement request.
iv. Safe and convenient bicycle access shall be provided from the external circulation system (e .g., from public access bike COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
paths, bike lanes, and/ or bi ke routes) to bicycle parking facilities on-site. Safe acce ss shall be provided so as to minimize conflicts with other vehicles and pedestrians as determined by the Public Works Department.
c. Nonresidential development proj ects capable of holding 150 employees or more shall provide all of the measur es required for nonresidential development projects capable of holding 50 and 100 employees and all of the following additional measures:
i. A safe and convenient zone if feasible and appropriate as determined by the Public Works and Community
Development Departments in which vanpool and carpool
vehicles may deliver or boar d their passengers. Passenger loading areas should be located as close as possible to the building entrance and should be designated in a manner that does not impede vehicular circulation in the parking area. A passenger loading zone or van turn-out area may be required to accomplish this requirement. In the case of multiple-tenant developments, more than one passenger loading zone may
be required and the location an d number of vanpool/carpool passenger loading zones shall be distributed in a manner acceptable to the Public Works and Community Development Departments.
ii. Sidewalks or other designated pathways following, to the greatest extent feasible, dire ct and safe routes from the external (public or private) pedestrian circulation system to each, and between each building in the development.
iii. If determined necessary by the Public Works and Community Development Departments to mi tigate project impacts, bus stop improvements shall be provided. Appropriate bus service improvements as determined by the Public Works Director include bus turnouts, bus pads (thickened pavement
structural section where bus tr avels or stops), bus shelters, bus benches, bus stops, bus lighting, etc. When locating bus stops and or planning building entrances, entrances should be designed to provide safe and efficient access to nearby transit stations and/ or stops as determi ned by the Public Works Director and the Community Development Director.
iv. Development design shall incorpor ate, to the extent feasible as determined by the Publ ic Works Director and the
Community Development Director, showers, changing rooms, lockers, etc., for employees who bicycle, jog or walk to work. v. Development design shall inco rporate an eating area and shall incorporate to the extent feasible as determined by the Departments of Public Works and Community Development
cafeterias, eating establishments, ATMs, day care facilities, COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
gyms, and other facilities which will reduce the need for mid- day driving. The requirement of this subparagraph will be deemed to be satisfied if the dev eloper enters into a written agreement with a neighboring pr oject to mutually share approved TDM facility or facilities such as eating areas, cafeterias, eating establishments, ATMs, day care facilities, and gyms.
LANDSCAPING
103. Landscaping Material Selection – All new landscaping treatment shall consist of a minimum combination of twenty-four-inch (24") box size and thirty-six inch (36") box size or larger deciduous and evergreen trees to help screen the building’s facades. All shrubs shall consist of a minimum of five (5) and fifteen (15) gallon containers. The type of landscaping material shall be accomplished in a manner that blends with existing landscaping treatment in the area. The specific size, number and species of plant materials used shall be included on the landscape plans subject to review and approval by the Community Development Department.
104. Manufactured Slope Landscaping – In accordance with the City’s Grading Ordinance (TOMC Section 7-3. 24), all manufactured slopes shall be landscaped with drought resistant native plants materials including tree clusters and ground cover and provided with a permanent irrigation system throughout. Landscaping and an irrigatio n system shall be installed 6 months following the completion of gr ading for the project. Prior to the issuance of a grading permit, landscaping and irrigation plans shall be submitted under separate permit for review and approval by the Community Development and Public Works Departments.
105. Parking Lot Shade Coverage – The applicant shall provide 50 percent shade coverage in parking lot areas within 15 years. Carports, which incorporate landscaping, may be us ed to provide 50 percent shade coverage in parking lot areas.
106. Lighting Standards in Planter Areas – Parking lot lighting standards shall be shown on the landscape plans and located in a manner to avoid conflict with proposed trees.
107. Final Landscape Plans – The submitted preliminary landscape plan is approved in concept only. Prior to t he issuance of a grading or building permit, final construction landscape and irrigation plans reflecting compliance with all imposed conditions of project entitlements shall be submitted under a separate permit fo r review and approval by the Community Development Department through a Landscape Plan Check COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
application. Any landscape and irrigat ion improvements shall be designed and installed in accordance with the City’s Guidelines and Standards for Landscape Planting and Irrigation Pl ans (Resolution Nos. 2006-108 and 2007-116), the Forestry Master Plan Thousand Oaks West Regional Character Design Guidelines, the Ventura County Fire Department’s Prohibit Plant List and associated standards and guidelines, the Ventura County Fire Department’s Ordinance 32 Chapter 49 Requirements for Wildland-Urban Interface Fire Areas, and in compliance with the State of California Model Water Effi ciency Landscape Ordinance (MWELO) standards and city ordinance prohibiting n on-functional turf in commercial and multifamily areas. The final la ndscape plan shall incorporate all landscape areas, including added areas as conditioned herein, including MM-BIO-8 (Invasive Species Prevention) , MM-BIO-9 (Landscaping Plan), MM-BIO-10 (Oak Tree Removal and Replacement), MM-BIO-11 (Tree Protection Prio to Construction) , MM-BIO-12 (Tree Protection and Maintenance During Construction), and MM-BIO-13 (Tree Maintenance After Construction).
Prior to the issuance of a grading permit, complete landscape and irrigation plans reflecting compliance with al l imposed conditions of project entitlements shall be submitted under a separate permit for review and approval. Said plans shall be subject to review and approval by the Community Development and Public Wo rks Departments. The location of light fixtures, including standards, shall be shown on the landscape plans to ensure no conflict occurs between the placement of trees/shrubs and light fixtures and to avoid plant growth interference with the level of illumination.
The use of reclaimed water for landscaping where available is encouraged.
Prior to the approval of the building permit, a lic ensed landscape architect is to provide a signed and stamped lette r to the Community Development Director confirming the landscape plan has been designed consistent with the above-referenced standards and conditi ons of this permit. Prior to the issuance of a certificate of occupancy for the final building, an independent auditor or licensed landscape architect is to provide a signed and stamped letter to the Community Development Director confirming the landscape plan has been installed consistent with the approved landscape plan.
108. Maintenance of Off-Site Landscape Planters – The applicant shall enter into a landscape maintenance agr eement with the Public Works Department to maintain the landsc aping in the public right-of-way along Rolling Oaks Drive and Los Padres Drive between the property line and back of sidewalk. Said off-site pl anter area shall be planted with trees, shrubs and groundcover and shall be in tegrated with the adjacent on-site landscaped area. The landscape design shall be subject to the review and COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
approval of the Community Devel opment Department and Public Works Department.
109. Permanent Maintenance of Landscaping – The approved landscaping shall be permanently maintained for the life of the project and in accordance with Section 1-6.01(e) (Public Nuisances) of the Thousand Oaks Municipal Code. Any redesign or alteration of pr oject landscaping shall be subject to approval of the Community Deve lopment Department and shall be accomplished through the filing of a Landscape Plan Check application, provided such alteration is consist ent with all City codes, policies, and project entitlement conditions.
WALLS, FENCES, AND SIDEWALKS
110. Wall Treatment – Any proposed screening wall, garden wall or retaining wall shall be decorative in appearanc e with similar, enhanced, or complementary materials and colors to those used on the proposed building, with appropriate relief methods (including pilasters and decorative cap). Final detail drawings reflecti ng design, materials selections and locations shall be submitted prior to the issuance of any building permit, subject to the review and approval by the Community Development Department.
111. Walls and Fencing – Fences and walls shall have a maximum exposed height of six feet. Where a solid fenc e or wall is provided, it shall be designed with both sides articulated, and with si milar, enhanced, or complementary materials and colors to those used on the proposed building. Perimeter fencing utilized along a public street or public open space must be constructed of decorative iron, steel, or pre-painted welded steel. Security fencing, such as electrical, barbed wire, razor wire or fences with sharp pointed features are prohibited. All fences and walls designed for screening purposes must be of solid material. Chain link fencing with or without slats is prohibited. If a gate is to be used to screen the transformer, the gate and enclosure shall be solid to conceal the interior area from public view. Said gate shall be decorative in appearance with similar, enhanced, or complementary materials and colo rs to those used on the proposed building and is subject to review and approval by the Planning Division of the Community Development Department.
112. Healing Garden Patio Wall Design – The exterior patio walls and railings shall be limited to a maximum exposed combined height of seven feet (7’).
Up to 60% of the exterior patio wall may be a solid masonry element or landscape planter and the remaining hei ght is to be a glass or an open railing system or landscaping with architectural qualities.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
113. Retaining Walls – All retaining walls shall be constructed of a decorative masonry material with a decorative cap. All retaining walls shall be limited to a maximum exposed height of seven feet six inches (7’6”) to twelve feet (12’) as shown on the submitted “P roject Plan Set,” dated February 29, 2024, attached to the Planning Commi ssion staff report dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024, pursuant to the following conditions. In no case shall retaining walls exceed 12 feet (12’). All retaining walls shall incorporate the design and materials utilized on the buildings and be softened by the installation of landscaping adjacent to the wall. Where such walls are exposed to public view, pilasters and/or horizontal articulation of vary ing depths shall be provided to break up a long linear monotonous appearance. The design and location of all retaining walls shall be subject to review and approval of the Community Development and Public Works Departments.
114. Parking Lot Screen Wall – The parking row adjacent to Rolling Oaks Drive and Los Padres Drive shall be screened from public view by a combination screen wall, undulated berm, and / or “solid” screen shrub mass a minimum of 36 inches high to mitigate vehi cle headlight glare and to screen the undercarriage of cars. Said wall sh all be decorative incorporating the design and materials utilized on the buildings. A flat shoulder shall be provided from the end of the parking stalls and on both sides of the screen wall to allow room for car overhang and the installation of landscaping in front of the wall. Additional landsc aping in lieu of the screen wall may be approved if it can be dem onstrated that the parki ng lot can be adequately screened. Specific design of mounding and screen wall including landscaping planting shall be subject to the review and approval of the Community Development Department and the Public Works Department prior to the issuance of a grading and building permit.
115. Screen Walls Screening walls facing Rolling Oaks Drive and Los Padres Drive shall incorporate articulation and include a decorative cap. Such articulation may include landscaping hedges, pilasters, varying wall depths, etc. Prior to the i ssuance of a grading permit, such design shall be submitted for review and approval by the Community Development and Public Works Department.
116. Perimeter Wall/Fence Design – All perimeter walls and fencing shall mitigate parked vehicle headlight gl are into adjacent properties. Final detailed drawings of all perimeter walls and fenci ng including elevations, material selections and site plan loca tions shall be submitted prior to the issuance of any building permit, subjec t to review and approval of the Community Development and Public Works Departments.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
117. Wall/Fence/Gate Design – Final detailed drawings of all walls and fencing including elevations, material selecti ons and site plan locations shall be submitted prior to the issuance of any building permit, subject to review and approval of the Community Developm ent and Public Works Departments.
Chain link fencing is not approved for any wall, fence or gate.
118. Construction/Security Fencing – Prior to the issuance of a grading/ building permit, the applicant shall install a temporary 5-foot-high chain-link fence around the project boundary. Said fencing shall be provided for purposes of maintaining security, as well as containing trash and debris on- site. The fence shall remain in place during all phases of construction and shall be maintained until no longer needed for trash and debris control as determined by the Community Devel opment Department. The applicant shall be responsible for pick-up of trash and debris on a weekly basis primarily during building construction operations.
LIGHTING
119. Site Illumination – The project’s site illumination shall be designed in a manner that is uniform in design and app earance. Lighting fixtures shall be architectural appropriate to the project. Lighting fixtures shall include flat lens and shielding devices to avoid an over-intensification of illumination, to direct the illumination in a downward direction (full cut-off), and to eliminate any spillover of light into adjacent properties and past the centerline of public streets. All lighting shall be consistent with the intent of the lighting as shown on the Exhibits labeled “Project Plan Set,” dated February 29, 2024, attached to the Planning Commission staff report dat ed March 11, 2024, and attached to the City Council staff report dated March 26, 2024.
120. Photometric Analysis – All exterior lighting shall be processed under a separate permit. Prior to the issuance of any electrical and building permits for exterior lighting, a photometric anal ysis, and prepared by a registered Electrical Engineer and accompanied by light fixture catalogues, brochures and specifications shall be submitted for review and approval by Building and Planning Divisions of the Community Development Department, as well as review by the Police Department. The photometric analysis shall specify brightness (footcandles and lumens ) and color (Kelvin and LED color temperatures). Prior to issuance of a certificate of occupancy for the final building, a registered Electrical Engineer is to provide a signed and stamped letter to the Community Development Director confirming the exterior lighting has been installed consistent with the approved photometric plan.
121. Energy Efficient Lighting – The applicant shall utilize LED and natural lighting for interior spaces rather than less efficient types of light wherever possible. For exterior areas, the use of metal halide and LED fixtures are COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
preferred over high-pressure sodium fixtures, since they provide superior illumination and color rendition; however, use of bright white, high intensity LED or metal halide lighting is prohibited.
122. Non-occupied Hours Lighting – During non-occupied hours, exterior building mounted/canopy lighting and ex terior parking lighting are to be automatically dimmed, at a minimum, to 20% and 30% respectively unless the Police Department directs for exterior lighting to be brighter to provide sufficient illumination to allow viewing of the exterior of the buildings and parking areas.
123. Wall Lighting – Building walls may be illuminated by decorative architectural lights but not by any wall-pack type light fixtures. Wall lighting may be permitted to enhance the buildin g design or to meet security requirements only and not as a means to illuminate the site. Lighting may be provided by decorative downward shie lded light fixtures, recessed in a downward direction from projecting canopies, recessed doorways, and window openings. Decorative architectural light fixtures shall be installed on the building walls. Architectura lly designed fixed pendant and bracket light fixtures are permitt ed. The use of such light ing shall be designed to create a uniform illumination generally in a downward direction and not create illumination hot spots or glar e on adjacent or nearby surfaces.
Catalogue cut sheets and specifications for all exterior lighting shall be submitted for the review and approval prior to installation by the Community Development Department.
124. Roof Lighting – No roof illumination shall be permitted except as otherwise needed to comply with building security requirements. The design and location of such fixtures shall be s ubject to review and approval of the Community Development Department pr ior to the issuance of a building permit. The rooftop areas shall be illu minated with wall sconces and shall not extend beyond the height of the parapet. Additionally, the rooftop areas may be illuminated subject to the following:
l. Cut-off shields shall be install ed/maintained on each side of the light fixtures visible from the parapet wall perspectives;
m. Motion sensors shall be installed to limit operation of the lighting to times activity is detected on the r ooftop areas. Lighting shall be off when no activity is on the rooftop; and
n. Stand-alone light st andards shall not exceed the height of the parapet.
125. Pedestrian Lighting – Pedestrian walkways may be illuminated by bollard lighting or by light poles reduced in height proportion to human scale.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
126. Decorative Lighting Above Public and Common Areas – Low-intensity lighting may be provided above and across any public and common exterior spaces provided the lighting does not interfere with Fire access requirements.
127. Parking Lot Lighting – Parking lot illumination shall be designed in accordance with the City’s parking lot standards as i dentified in the City’s Building and Security Ordinance No .1395-NS utilizing decorative light fixtures and shall not e xceed 14 feet in height above finished grade level.
Review and approval of such lighting shall be processed under a separate permit. Special design featur es within these fixtures shall include flat lens and shielding devices to avoid an ove r-intensification of illumination, to direct the illumination in a downward direction (full cut-off) and to eliminate any spillover of light into adjacent properties and public streets.
All light poles shall be located withi n landscaped areas, three feet from parking surfaces with 24-inch-high concrete pedestals. All pedestals shall be painted the same color which shall match one of the main wall colors of the buildings, subject to the revi ew and approval of the Community Development Department.
Where pedestrian walkways occur, the height of these fixtures may be reduced in proportion to human scale. Use of bollard type lighting for safety adjacent to driveways is also encouraged for pedestrian traffic circulation.
All lighting attached to these features shall be decorative, oriented in a downward direction, and downward shielded.
Prior to issuance of a parking lot el ectrical permit, a photometric analysis and light fixture catalogue cuts and specifications shall be submitted to the Planning and Building Divisions for review and approval.
128. Restriction of Light Poles – Light poles are prohibited at the ends of the landscape fingers as the end of landscape fingers are intended be planted with trees to allow their canopies to co ver drive aisles and parking spaces and to reduce the likelihood of a vehicl e colliding with a light pole. The location of a light pole located within a landscape finger is to be coordinated effort between a landscape architect and a photometric engineer.
Deviations from this prohibition s hall be permitted only be written consent of the Community Development Director or designee.
NOISE
129. Noise Control – Proposed medical office bu ilding operations, including emergency generators and loading docks, shall be designed to comply with the Thousand Oaks 2045 General Plan Noise Element. Idling of trucks and COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
other equipment is prohibi ted. The loading do cks shall include power sources for vehicles and other equipment to eliminate need for idling. An acoustical report addressing exte rior noise sources and showing compliance with the City’s noise regulations, shall be submitted during plan check for review and approval by t he Planning Division and Building and Safety Division of the Community Development Department.
SIGNS
130. Signage – Any proposed sign shall comply with the requirements of the City’s Sign Ordinance Section 9-4.2308 (Commercial and Industrial zones) and City Council Resolution 2005-11 (A rchitectural Design Review Guidelines). The size, design, color and location of any proposed signs as well as address numbers shall be processed under separate sign permit applications, subject to the review and approval by the Community Development Department. A sign program application shall be submitted for review and approval by the Comm unity Development Department prior to the issuance of building permit for the first building.
131. Monument Signs – Monument signs shall conform with the definition found in TOMC Sec. 9-4.2303. Monument signs shall be designed in accordance with the standards contained TOMC Se c. 9-4.2308(ah)(3). The sign area for all monument signs shall not exc eed one square foot of sign area for each two lineal feet of st reet frontage (Rolling Oaks Drive and Los Padres Drive). The sign area for each monument sign shall not exceed 32 square feet. The overall monument feature s hall not exceed six feet in height or eight feet in length and shall contain high quality metal letters pin mounted to the wall. The design of the m onument sign(s) sha ll complement the architecture of the buildings by usi ng similar colors, materials, and design features to achieve a coordinated project appearance.
ACCESSIBILITY
132. Plan Check/Building Permit Submittal – Prior to the issuance of building permits, the accessibility requirements for the exterior shall be approved by the Building Division for Disabled Access Compliance.
133. Title 24 Compliance – All requirements of Calif ornia Uniform Building Code, Title 24, California Code of Regulations, shall be met. A set of plans, at a scale not less than one inch equal to ten feet (1"=10') shall be submitted to the Community Development D epartment displaying all exterior physically disabled accessibility require ments, including point elevations and details. Prior to the issuance of building permits, the accessibility requirements for the exterior shall be approved by the Building Division for disabled access compliance.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
134. Path of Travel – The path of travel from the accessible parking spaces to the building entrances sha ll meet the current standar ds of the California Uniform Building Code.
135. Interior Design Approval – The accessibility requirements for the interior of the proposed buildings will be re viewed when construction documents are submitted for plan check to the Building Division.
BUILDING & SAFETY
136. Design in Accordance with the Building Code Effective at the Time of Building Permit Application Submittal – Project is to be designed in accordance with current California Building Code Standards and City of Thousand Oaks Municipal Code local amen dments effective at the time of building permit application submittal to the Building Division. The current California Code edition adopted by the City of Thousand Oaks is 2022.
137. Demonstrate Compliance with Building Code – The project consists of a new, approximately 58,000 square-foot, two story medical office building and related site work. The design will be required to demonstrate compliance with the allowable building area, number of stories and building height as indicated in the building code based on the Type of Construction, Occupancy category and the setbacks from the adjacent buildings/ property lines or easements.
138. Provide Analysis for Fire Related Items – Project will provide:
a. Fire resistance rating requirement s for exterior walls based on Type of Construction.
b. Depending upon classification from the Ventura County Fire Department, the building may need to show compliance with the requirements of Chapter 7A from the California Building Code for exposure to High Fire Hazard Area.
c. Provide fire rated separation walls and horizontal assemblies as required.
139. Egress Plan – Provide egress plan for the whole building per chapter 10 of the California Building Code.
140. Accessibility Requirements – Provide design to show compliance with chapter 11B of the California Building Code.
141. Energy design – Show compliance with Part 6 California Energy Code.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
142. Green Building design – Show compliance with Part 11 California Green Building Standards.
143. Engineering requirements – Provide engineering desi gn to substantiate the structural integrity of the building based on the local Building Code and site specific seismic and wind par ameters. Provide a Geotechnical Investigation Report to substantiate the foundations for the proposed structure.
CONSTRUCTION
144. Construction Phasing – The project will be constructed in a single phase.
145. Biological Surveys – Consistent with MM-BIO-1 and BIO-3, if project activities (i.e. demolition, grading, c onstruction, landscaping, and/or tree removal, etc.) occur between February 1 and September 30, a breeding bird survey is required to be conducted and active nests shall be avoided.
Consistent with MM-BIO-4, if project activities (as described in this condition) occur between March and July 31, a bat roost survey is required to be conducted and active roosts sha ll be avoided. Consistent with MM- BIO-5, if project activities (as descr ibed in this condition) occur between February 1 and October 31, a Crotch bum ble bee survey is required to be conducted and active nests shall be av oided. Minimum buffer distances shall be implemented as determined by a qualified biological monitor. See MM BIO-1, BIO-3, BIO-4, and BIO-5 for additional details.
146. Rodent Control – The applicant shall submit a rodent control plan to the Community Development Department prior to the issuance of any grading permit or building permit, which shall include measures to protect adjacent and nearby properties from any rodent displacement during the project demolition phase, construction activities, and operational phase. The rodent control plan is to specify the use of anticoagulant rodenticides is to be a last option of rodent control consistent with City Council Resolution 2015-015.
147. Parking/Materials Storage During Construction – A parking and materials storage plan shall be submitted to the Planning Division for review and approval prior to the issuance of grading permits. The intent of this requirement is to ensure construc tion crew parking does not negatively impact properties in the area. The applicant is to identify areas on-site for construction worker parking and material staging.
148. Construction Outreach – Prior to the start of construction, the applicant shall invite all residents of the Rolling Oaks Homeowners Association and the Los Robles apartments at 300 Ro lling Oaks Drive, and the property managers of 325, 351, 375, 401, & 415 East Rolling Oaks & 425 Haaland COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70732-DP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
Drive to a pre-construction meeting to review the construction schedule and hours, the construction safety plan, construction equipment and material storage locations, utility interruption protocols, parking management, and distribution of construction superintendent and developer contact information.
149. Pre-construction Meeting – Prior to issuance of grading permits or building permits, whichever occurs first, the applicant shall coordinate with the Community Development and P ublic Works Departments, a pre- construction meeting at the job site to review field conditions, project conditions, methods and procedures , individual and City department responsibilities associated with the project. Members attending this meeting shall include but not be limited to City department representatives, owner or designated project coordinator , architect, project consultants, general contractor, monitors (includi ng, but not limited to, arborists, biologists, archaeologists), and other r epresentatives associated with the project. The meeting shall be arr anged no sooner than one (1) week prior to commencement of work.
150. Construction Progress – Once permits have b een issued to commence work on the improvements, it is the applicant’s/owner’s responsibility to diligently pursue completion per a ll conditions, requirements and as represented on the approved plans. Reasonable progress shall occur on a continual basis until completion to the satisfaction of the Community Development Director. Work sha ll not be discontinued for a period exceeding 30 days, without acceptable caus e. The intent is to have the project completed in a timely fashi on to prevent a potent ial blight from partially completed construction.
151. Hours of Construction/Construction Parking – All grading and construction activities shall be limited to the hours of 7:00 a.m. to 7:00 p.m., Monday through Saturday. No construction activities shall be permitted on Sunday or holidays recognized by the City of Thousand Oaks. There shall be no congregation of construction worker s, construction related vehicles, or warming of equipment engines in the vicinity of the project site outside of the established hours of construction.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70736-PMW
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70736- PMW
152. Land and Application – The Parcel Map Waiver is granted for the land described in the application, and any attachments thereto, and as described on the submitted legal description label ed “Legal Description” Exhibits “A” and “B”, dated November 3, 2023, a ttached to the Planning Commission staff report dated March 11, 2024, and attached to the City Council staff report dated March 26, 2024.
153. Scope of Permit Approval – The Parcel Map Waiver is granted to allow the merger of two parcels of record , into one lot, as described the on submitted legal description labeled “Legal Description” Exhibits “A” and “B”, dated February 29, 2024, attached to the Planning Commission staff report dated March 11, 2024, and attached to the City Council st aff report dated March 26, 2024, and subject to the following conditions.
154. Approval Period/Map Recordation – The Parcel Map Waiver is approved for a 36-month period of time from City Council final project effectuation (30 days after the Zone Change 2022-70733- Z’s second reading) ending May 9, 2027, at which time said map shall expire unless a Notice of Merger has been recorded. The applicant may request a two-year time extension of this period, as allowed by Section 9-3.704(b) of t he Thousand Oaks Municipal Code, by filing a minor modifica tion application with the Community Development Department prior to the expiration date.
155. Recordation of Lot Merger Documents – Prior to building permit issuance, the property owner shall comp lete final recordation of the Map Waiver (Lot Merger) approved by t he City of Thousand Oaks, Case No. 2022-70736-PMW, and file the recordation docum ents with the Planning Division.
156. Notice of Merger – A Notice of Merger shall be signed by the property owner of the subject properties and subm itted for review and approval of the Community Development Department and Public Works Department for subsequent recordation in the Office of the Ventura County Recorder. Upon recordation, a copy of the recorded No tice of Merger shall be submitted to the Community Development Department.
157. Approval Contingency – This Parcel Map Waiver approval is required to be recorded prior to the issuance of a Certificate of Occupancy pursuant to Development Permit 2022-70732-DP.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70735- PTP
158. Land and Application – The Protected Tree Permit is granted for the land described in the application and any atta chments thereto and as indicated on the Demolition Plans and Horizontal Control and Paving Plans, as part of the Protected Oak Tree Arborist Report, dated August 22, 2023, and prepared by Evergreen Arborist Consul tants, Inc., Michael Green, Registered Consulting Arborist No. 602.
159. Scope of Permit Approval – The Protected Tree Permit is granted to allow removal of 14 protected oak trees consisting of 11 coast live oak (Quercus agrifolia) trees, two holly oak ( Quercus ilex ) trees, and one valley oak (Quercus lobata) tree, and, consistent with MM-BIO-10 (Oak Tree Removal and Replacement) to plant replacement tr ees at a 3:1 ratio resulting in a total of 42 oak trees consisting of 26 24-inch box size and 16 36-inch box size oak trees being planted on site. Additionally, this PTP would allow encroachment within the protected zone of protected trees consisting of five coast live oak ( Quercus agrifolia) trees, one valley oak ( Quercus lobata) trees, and one toyon ( Heteromeles arbutifolia ) tree indicated on the Demolition Plans and Horizontal Contro l and Paving Plans, as part of the Protected Tree Report, dated August 22, 2023, and prepared by Evergreen Arborist Consultants, Inc., Michael Gr een, Registered C onsulting Arborist No. 602, for the demolition of the existing improvements and development of a new two-story, medical office building and related site improvements.
160. Approval Period – The Protected Tree Permit is granted in conjunction with 2022-70732-DP, 2022-70736-PM W, 2022-70735-PTP, and Environmental Impact Report 2022-70775-EIR and shall expire with these permits.
161. Removal of Trees and Debris – All portions of the 11 coast live oak (Quercus agrifolia) trees, two holly oak (Quercus ilex) trees, and one valley oak ( Quercus lobata ) tree, are approved for removal, as well as, any deadwood from the on-site and off-site protected trees shall be removed from the site and disposed of legally . Additionally, the stumps shall be completely removed to a minimum of two (2”) inches below grade and the hole filled with soil.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
162. Protected Tree Replacement – In accordance with the Oak and Landmark Tree Preservation and Protection r equirements, the 11 coast live oak (Quercus agrifolia) trees, two holly oak (Quercus ilex) trees, and one valley oak (Quercus lobata) tree are to be replaced.
Consistent with MM-BIO-10 (Oak Tr ee Removal and Replacement), all protected Oak trees sha ll be replaced consistent with the Thousand Oaks Oak Tree Ordinance and the Oak Tr ee Preservation and Protection Guidelines under a Type “C” Oak Tree Permit. Oak tree replacement shall be at a 3:1 ratio for total of resulting in a total of 42 oak trees consisting of 26 24-inch box size and 16 36-inch box size oak trees being planted on site, consisting of coast live oak (Quercus agrifolia), holly oak (Quercus ilex), or Valley Oak (Quercus lobata). Depending on nursery availability and project site size limitations, if different siz ed trees are proposed for installation, an alternate proposal (considering size, quantity, tree type and site) shall be reviewed and approved by the City of Thousand Oaks Community Development Director during plan check.
163. Irrigation/Landscaping Encroachments – All plans for landscaping beneath a protected tree shall be submitted for the review and approval of the Community Development Department.
164. Drainage – Positive drainage shall be provided to direct run-off away from any protected tree.
165. Lighting Encroachments – No lighting system shall be installed within the protected zone of any oak tree or landmark tree except as otherwise authorized by the Community Development Department.
166. Oak and Landmark Tree Preservation and Protection Guidelines Compliance – All construction activities on or near a protected tree shall conform and abide by the City of Thousand Oaks, Oak and Landmark Tree Preservation and Protection requirements as specified in Article 42 of Chapter 4 of Title 9 of the Municipal Code.
167. Pre-Construction Meeting – Consistent with MM-BIO-11: (Tree Protection Prior to Construction), a pre-construction meeting shall be held between all contractors (including grading, tree removal/pruning, builders) and the ISA- Certified Arborist. The ISA- Certified Arborist shall in struct the contractors on tree protection practices and answer any questions. All equipment operators and spotters, assistants, or those directing operators from the ground shall provide written acknowl edgment of having received tree protection training. This training shall include information on the location and marking of protected trees, the nece ssity of preventing damage, and the discussion of work practices that will accomplish such.
COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70735-PTP
cdd:420-46/sk/jk/H;COMMON/City Council/Agenda Packet/2024/2024- 03-26/Attachment 3 Resolution/pz (FILE ID: 2022- 70775-EIR/2022-70587-LU/2022-70733-Z/2022-70732-DP/2022-70736-PMW/ 2022-70735-PTP/LPC-2023-70008
168. On-Site Work Monitoring/Cert ification/Field Inspection – Consistent with MM-BIO-12 (Tree Protection and Maintenance during Construction) an International Society of Arboriculture (ISA) Certified Arborist shall inspect the twenty-six (26) preserved trees on a monthly basis during construction.
A report comparing tree health and condition to the original, pre- construction baseline shall be submitted following each inspection.
Photographs of representative trees are to be included in the report on an annual basis at minimum. All work described in this permit shall be monitored by the applic ant’s Tree Consultant and it shall be the responsibility of the applicant to contact the consultant and arrange for the successful completion of these conditi ons. The applicant is required to provide written notice to the following parties at least 48 hours prior to beginning any work within the protect ed zone of any preserved tree: the City’s Community Development D epartment, the City’s Oak Tree Consultant, the Applicant’s Oak Tree Preservation Consultant. Additionally, the applicant’s Tree Consultant shall submit a Letter of Certification within fourteen (14) days of completion to the Community Development Department, stating that all work was accomplished in accordance with the Revised Tree Report for this project, except as deleted or modified by conditions of this permit. Upon receipt of the Letter of Certification, Staff shall schedule a field inspection.
169. Protective Fencing, Flagging and Signage for On-site and Off-site Oak Trees – Consistent with MM-BIO-11: (Tree Protection Prior to Construction), an International Societ y of Arboriculture (ISA) Certified Arborist shall be retained to oversee that all remaining trees that will not be relocated or removed shall be preserved and protected in place. Prior to any grading or construction activities, the applicant and the applicant’s Tree Consultant shall confirm with the Community Development Department that required signage and protective chain- link fencing (or other material satisfactory to City of Thousand Oaks planning staff) measuring a minimum of five feet (5’) in height sha ll be placed at the protected zones (approximately 15 feet fr om the trunk or 5 feet outside the dripline, whichever is greater, of each tree or edge of canopy for cluster of trees) or construction limits for all on-site and off- site protected trees in accordance with the Oak and Landmark Tree Preservation and Protection requirements.
The fencing shall be staked every six feet (6’). In addition, aboveground tree parts that could be damaged by construction equipment (e.g., low limbs, trunks, roots protruding from the soil) shall be flagged with red ribbon prior to the start of construction. Fencing and flagging shall remain in place throughout grading and construction acti vities. The fenced area shall be considered the tree protection zone (TPZ) unless proximate construction requires temporary removal. Installati on of said fencing and flagging shall be reviewed and approved by the Pl anning Division of the Community COMMUNITY DEVELOPMENT DEPARTMENT CONDITIONS FOR 2022-70735-PTP