Cities Index.
Agenda

Twentynine Palms City Council
March 14, 2023

Document
Agenda
Meeting
March 14, 2023
Body
Twentynine Palms City Council
Pages
143
Original file
30.8 MB
Text extracted from the city's file for reading and search. Open the original on citwentynine-palmsca.civicweb.net. That file is the official record.

Converse Consultants GLT2022

CONVERSE CONSULTANTS
Schedule of Fees – Geotechnical Laboratory Testing
Compensation for laboratory testing services will be made in accordance with this fee schedule which includes test report(s) and engineering time. Costs of tests not on this schedule will be by quote and/or in accordance with our current hourly fee schedule. The rates are based on non-contaminated soil. A surcharge will be charged for handling contaminated material, which will be determined based on the project.

IDENTIFICATION AND INDEX PROPERTIES TESTS
Visual Classification, ASTM D2488...................................20.00 Engineering Classification, ASTM D2487 .........................25.00 Moisture Content and Dry (bulk) Density,
ASTM D2216 and D2937.............................................25.00 Moisture Content, ASTM D2216 ..................................20.00 Shrinkage Limit, ASTM D4943..........................................85.00 Atterberg Limits, ASTM D4318
Several points ............................................................150.00 One Point.....................................................................50.00 Particle Size Analysis, ASTM D6913
Fine Sieve, from +#200 to #4.....................................100.00 Coarse and Fine Sieve, from #200 to 3 in..................180.00 Hydrometer ................................................................120.00 Percent Passing #200 Sieve, ASTM D1140......................80.00 Specific Gravity
Fine, passing #4 sieve, ASTM D854..........................100.00 Coarse, retained on #4 sieve, ASTM C127................100.00 Sand Equivalent Test, ASTM D2419...............................120.00 Double Hydrometer Dispersion, ASTM D4221................150.00

COMPACTION AND BEARING STRENGTH
Standard Proctor Compaction, ASTM D698 or ASTM D1557
Method A or B............................................................200.00 Method C, 6” mold......................................................210.00 California Impact Method, Caltrans 216..........................220.00 R-value, ASTM D2844 and CTM301...............................270.00 California Bearing Ratio (CBR), ASTM D1883
1 Point........................................................................530.00 3 Points ......................................................................750.00 Relative Density

0.1 Cubic Foot Mold...................................................200.00

0.5 Cubic Foot Mold...................................................300.00

SHEAR STRENGTH
Torvane/Pocket Penetrometer ..........................................25.00 Direct Shear
Quick Test....................................................................75.00 Consolidated, Drained, granular soil,
ASTM D3080 ........................................................220.00 Consolidated, Drained, fine grained soil,
ASTM D3080 ........................................................260.00 Consolidated, Undrained, fine grained soil.................220.00 Residual Strength, per cycle ........................................70.00 Remolded Specimens ..................................................70.00

STATIC UNIAXIAL AND TRIAXIAL STRENGTH TESTS
(PER POINT)
Unconfined Compression, ASTM D2166 ........................150.00 Unconsolidated, Undrained, ASTM D2850 .....................160.00 Consolidated, Undrained, per point ................................700.00 Consolidated, Drained, per point ....................................700.00 With Pore Pressure Measurement, per load...................150.00 Remolded Specimen.........................................................90.00 CONSOLIDATION (ASTM2435) AND SWELL COLLAPSE
(ASTM D4546) TESTS
8 Load Increments ..........................................................250.00 Additional Load Increment ................................................50.00 Time-Ratio, per load increment.........................................90.00 Single Point, collapse test.................................................90.00 Single Load Swell, ASTM D4546
Ring Sample, Field Moisture......................................... 95.00 Ring Sample, Air Dried ................................................. 95.00 Remolded Sample.............................................................. 70.00 Expansion Index Test, UBC 29-2/ASTM D4829................130.00

HYDRAULIC CONDUCTIVITY TESTS
Constant Head, ASTM D2434...........................................250.00 Falling Head Flexible Wall, ASTM D5084 .........................300.00 Triaxial Permeability, EPA 9100........................................350.00 Remolded Specimen.......................................................... 60.00

CHEMICAL TESTS
Corrosivity (pH, resistivity, sulfates, chlorides)..................220.00 Organic Content, ASTM D2974.........................................100.00 Conditions: Unit rates presented on this fee schedule are for routinely performed geotechnical laboratory tests. Numerous other earth material physical tests can be performed in our geotechnical laboratories, including rock core, soil cement and soil lime mixture tests. Tests not listed can be quoted upon request. This fee schedule is valid through December 31, 2022.

Prices are based on the assumption that samples are uncontaminated and do not contain heavy metals, acids, carcinogens and/or volatile organics which can be measured by an organic vapor analyzer or photoionization detector with a concentration greater than 50 parts-per-million (ppm). Quoted testing fees are based on the assumption that no protective clothing will be required to handle samples. If Level D protective clothing will be required during handling of samples (as defined in Federal CFR Part 1910.120), then a 40% increase in fees presented in this schedule will be applied. Level C protective clothing will be a 60% increase in fees. Converse will not handle samples that require either Level B or Level A protection in our geotechnical laboratories.

Contaminated samples will be returned to the client. Uncontaminated samples will be disposed of 30 days after presentation of test results. The client must disclose the source of samples. Samples imported from out of state will be incinerated after testing in accordance with requirements of the United States Department of Agriculture. Soil samples obtained within the State of California currently designated quarantine areas will also be incinerated in accordance with the requirement of the State of California, Department of Food and Agriculture, Division of Plant Industry, Pest Exclusion. A $5.00 incineration fee will be added to each sample that is required to be incinerated in accordance with State and Federal law.

Test results requiring plots will be presented in a publishable format generated from computer programs. Otherwise, raw test numbers will be presented. A minimum laboratory fee of $50.00 will be charged to present and mail test results. Beyond the standard U.S. Mail delivery, specialized transmittal will be charged at additional cost (e.g., Federal Express, UPS, etc.). Geotechnical testing does not include engineering and/or geologic review and analysis.

Typical turnaround for geotechnical laboratory testing is two weeks (or roughly ten working days). To expedite test turnaround to five working days, a 50% increase in the fees in this schedule will be applied. Many geotechnical tests require at least one week to perform in accordance with ASTM or other standard specifications. Fees presented in this schedule for relatively undisturbed direct shear, consolidation or expansion pressure tests are based on the assumption that 2.416-inch inside diameter brass ring samples will be provided to the geotechnical laboratory for testing. Remolded specimens will be compacted in standard 2.5-inch outside diameter brass rings for direct shear, consolidation and expansion pressure tests. All fees presented in this schedule are based on the assumption that the client will deliver samples to our laboratory at no additional cost to Converse.

Invoices will be issued monthly and are payable on receipt unless otherwise agreed upon. Interest of 1.5% per month (but not exceeding the maximum allowed by law) will be payable on any amount not paid within thirty days; payment thereafter to be applied first to accrued interest and then to the principle unpaid amount. The Client shall pay any attorneys' fees or other costs incurred in collecting any delinquent amounts.

Page 116 of 143 ends

Converse Consultants MTS2022

CONVERSE CONSULTANTS
Schedule of Fees – Materials Laboratory Testing
Compensation for laboratory testing services will be based on rates in accordance with this fee schedule which includes test report(s) and engineering time. Costs of tests not on this schedule will be by quote and/or in accordance with our current hourly fee schedule. Our services will be performed in accordance with the General Conditions. This fee schedule is valid through December 31, 2022.

AGGREGATES
Moisture Content, ASTM D2216 .............................................. 20.00 Particle Size Analysis
Coarse, ASTM C136, each............................................... 100.00 Coarse and Fine, ASTM C136 & C137), each.................. 180.00 Specific Gravity & Absorption
Coarse Aggregate, ASTM C127....................................... 100.00 Fine Aggregate, ASTM C128 ........................................... 100.00 Unit Weight per Cubic Foot, ASTM C29 ............................. 75.00 Soundness, Sodium or Magnesium, ASTM C88, each..... 200.00 Potential Alkali Reactivity, ASTM D289 ............................ 300.00 Freeze Thaw Soundness.................................................. 175.00 Los Angeles Abrasion, per class, ASTM C131, C535....... 220.00 Sand Equivalent, ASTM D2419........................................ 110.00 Lightweight Particles, ASTM C123, each.......................... 100.00 Clay Lumps & Friable Particles, ASTM C142, each.......... 120.00 Stripping Test, ASTM D1664, each .................................... 85.00 Organic Impurities, ASTM C40......................................... 100.00 Durability ...................................................................... By Quote

CONCRETE TESTS
Laboratory Trial Batch, ASTM C192 .................................. By Quote Laboratory Mix Design, Historical Data.............................. By Quote Compression Test, 6”x12” Cylinder, ASTM C39, each............. 45.00 Lightweight Concrete
Compression ...................................................................... 45.00 Unit Weight......................................................................... 45.00 Specimen Preparation, Trimming or Coring, each ................... 60.00 Bond Strength, ASTM C321
Prepared by Converse...................................................... 150.00 Prepared by Others ............................................................ 80.00 Core Compression Test, ASTM C12, each.............................. 80.00 Flexure Test, 6”x6” Beams, ASTM C78, each........................ 110.00 Modulus of Elasticity, Static, ASTM C469, each .................... 150.00 Length Change, ASTM C157, 3 bars, 5 readings each,
up to 26 days.................................................................... 320.00 Splitting Tensile, 6”x12” Cylinders, each.................................. 80.00 Field Concrete Control (sampling, slump, temperature,
cast 4 cylinders, molds, cylinder pick-up, within 10 miles of office, stand-by extra), ASTM/UBC, hourly rate
schedule, or each cylinder.................................................. 95.00 Field Concrete Control (same as above plus air content test), ASTM/UBC, each cylinder.................................................. 95.00 Hold Cylinder........................................................................... 10.00 Cylinder Mold, sent to job site but not cast by Converse or returned to Converse............................................................ 5.00 MASONRY (ASTM C140, E447, UBC STANDARD 24-22)
Moisture Content, as received, each........................................ 20.00 Absorption, each...................................................................... 50.00 Compression, each.................................................................. 55.00 Shrinkage, ASTM C426, each ............................................... 100.00 Net Area and Volume, each..................................................... 25.00 Masonry Blocks, per set of 9.................................................. 450.00 Masonry Core Compression, each........................................... 55.00 Masonry Core Shear, each...................................................... 55.00 Masonry Core Trimming, each................................................. 55.00 Compression Test, grouted prisms, 8”x8”x16”, each.............. 120.00 Compression Test, grouted prisms, 12”x16”x16”, each.......... 130.00 Compression Test
2”x4” Mortar Cylinder, each ................................................ 45.00 3”x6” Grout Prisms, each.................................................... 45.00 2” Cubes, ASTM C109, each.............................................. 45.00 Cast by Others......................................................................... 45.00 Mortar or Grout Mix Designs.............................................. By Quote

FIREPROOFING TESTS
Oven Dry Density, per sample................................................. 70.00

MOISTURE EMISSION TEST
Moisture Emission Test Kit......................................................80.00

ASPHALTIC CONCRETE
Stability, Flow, and Unit Weight, ASTM D6927 .....................220.00 Marshall ASTM D1559, ASTM D2726...................................220.00 Measured Maximum Specific Gravity of Mix, ASTM D2041,
Rice Method, each ............................................................95.00 Void Analysis of Cores or Marshall Specimens,
Calculations Only, ASTM D3203, set of 2 or 3...................60.00 Laboratory Mixing of Asphalt & Concrete, per sample.............75.00 Complete Asphalt Concrete Mix Design
Hveem or Marshall ......................................................By Quote Extraction of Asphalt and Gradation, ASTM D2172, Method B, or California 310, including ash correction, each .............220.00 Extraction of Rubberized Asphalt & Gradation, each.............250.00 Specific Gravity, ASTM D2726 or ASTM D1188
Uncoated...........................................................................95.00 Coated.............................................................................105.00 Immersion-Compression .......................................................400.00 Particle Coating, ASTM D2489 ...............................................60.00 Stripping, ASTM D1664 ..........................................................70.00 Moisture or Volatile Distillates in Paving Mixtures, or Materials Containing Petroleum Products or
By-Products.....................................................................220.00 Retained Strength, ASTM D1074/D1075, 6 specimens.....By Quote Retained Stability, Mil, Std, 520A, Method 104,
6 specimens ................................................................By Quote CBR, ASTM D1883, including M/D Curve, 1 point ................350.00 Asphalt Temperature...............................................................15.00

STRUCTURAL STEEL
Tensile Test #9 Bar or Smaller, each ......................................60.00 Bend Test #9 Bar or Smaller, each .........................................60.00 Tensile Test #10 Bar or Greater, each ..................................280.00 Tensile Test #14 Bar, each ...................................................310.00 Rebar Coupler Tensile Test ..................................................100.00 Tensile Test, Welded #9 Bar or Smaller, each ......................100.00 Tensile Test, Welded #10 Bar or Greater, each ....................280.00 Tensile Test, Welded #14 Bar, each .....................................310.00 Tensile Test, Mechanically Spliced, #9 Bar or Smaller,
each ................................................................................180.00 Tensile Test, Mechanically Spliced, #10 Bar or Greater, each ................................................................................350.00

HIGH STRENGTH BOLT, NUT, AND WASHER TESTING
Wedge Tensile Test, A490 Bolts
Under 100,000 lbs., each ..................................................65.00 Over 100,000 lbs., each ....................................................75.00 Wedge Tensile Test, A325 Bolts
Under 100,000 lbs., each ..................................................80.00 Tensile Test, Anchor Bolts, tested with displacement
transducers, each............................................................300.00 Nut Hardness, Proof & Cone Proof Load Test, each...............50.00 Washer Hardness, each..........................................................50.00 A325 or A490, Bolt Hardness Only, each................................50.00 Bolt A325 or A490 Wedge Tensile
Under 100,000 lbs. & Hardness, each...............................90.00 Over 100,000 lbs. & Hardness, each...............................150.00 Bolt, Nut & Washer, all tests per set with bolts
Under 100,000 lbs. ..........................................................300.00 Over 100,000 lbs. ............................................................380.00 See Schedule of Fees – Geotechnical Laboratory Testing for soil testing. Hourly rates are available upon request. Field Laboratory rates are available upon request. Listed unit rates are based upon the assumption that samples will be delivered to our laboratory at no cost to Converse.

Page 117 of 143 ends

Michael Baker International, Inc. (Michael Baker)
Firm Contact
Michael Baker International
75-410 Gerald Ford Drive, Suite 100
Palm Desert, CA 92211
Christopher Alberts, PLS, Vice President
(760) 341-6110
[email protected]
Rate Schedule
Personnel Hourly Rate
2-Person Survey Crew $295
1-Person Survey Crew $175
Licensed Surveyor $205
Field Supervisor $185
Survey Director $300
Project Surveyor/Mapper $150
Survey/Mapping Analyst $135

Page 118 of 143 ends
Page 119 of 143 ends

PAGE | 1
pw://Carollo/Documents/CA/Twentynine Palms/201371-600000/01 Project Management/02 Contract/30 Amendments/CDR_Amendment/29Palms_Scope of Work

CITY OF TWENTYNINE PALMS, CA
WASTEWATER TREATMENT FACILITY – CONCEPTUAL DESIGN REPORT,

DESIGN-BUILDER PROCUREMENT, AND PROJECT CONTROLS INITIATION

SCOPE OF WORK AND FEE ESTIMATE
The purpose of this document is to provide scope of work and fee estimate to amend the original Agreement, dated July 30, 2022, between the City of Twentynine Palms (City) and Carollo Engineers, Inc. (Consultant) for developing a Conceptual Design Report (CDR), assistance with procurement of a DesignBuilder, and project controls initiation for the City’s new wastewater treatment facility (WWTF). The City intends to deliver the new WWTF utilizing Progressive Design-Build and is planning to initiate procurement of a Design-Builder in Quarter 1 of 2024.

Background
Currently, most of generated wastewater within Twentynine Palms is disposed through individual onsite septic tanks. The City is planning to transition from existing septic tanks to a centralized system, by collecting and conveying the generated wastewater to a new WWTF. As a part of early tasks, a CDR is needed to establish the design criteria and requirements for the WWTF. The CDR will serve as the technical documentation provided to prospective Design-Builders for the purpose of preparation of proposals and for serving as the “bridging documents” that will inform the selected Design-Builder’s design and cost development. Preparation for procurement of a Design-Builder includes procurement planning and development of procurement documentation. Project controls initiation is required to establish the approach and systems to manage documents, schedule, cost and risks during the Progressive Design-Build delivery.

List of Assumptions
For developing the scope of work and fee estimate, the following assumptions are made:
 The CDR will be prepared at a conceptual level, i.e., up to 5 to 10 percent of overall design completion.
 Scope is limited to treatment plant - wastewater conveyance, and solids and recycled water disposals are not included.
 Plant effluent will meet requirements for “Disinfected Tertiary Recycled Water” in California Title 22 Code of Regulations.
 Influent flow raw data will be provided by others.
 In absence of influent wastewater characteristics, Consultant will determine constituents’ concentrations based on reasonable assumptions.
 No geotechnical investigations or site survey activities are included.  No funding or environmental documentation support services are included.  Work will be performed starting in February 2023 and by March 1 2024 (approximate 12-month duration).
 Design-Build contractual terms and conditions, and contractual documentation will be developed by City’s legal counsel. Consultant will coordinate with City’s legal counsel and provide technical input into contractual documents and develop scope and technical exhibits that accompany the DesignBuild Agreement.  Client reviews of documents will be provided within two weeks (ten working days)

Page 120 of 143 ends

PAGE | 2
Scope of Work
The scope of work is defined under the following tasks:

Task 1: Project Management, Meetings, and Workshop
Consultant will provide overall project management which includes supervising and coordinating work by Consultant staff, maintaining regular correspondence with City, conducting meetings/workshops to discuss progress and to make decisions, and preparing monthly status reports and invoices.

Task 1.1: Project Management and Administration
Consultant’s Project Manager will supervise the Consultant’s work and will be in regular contact with City’s Manager to discuss and resolve any ongoing issues. Also, Consultant will provide monthly status reports and invoices to City.

Deliverables:
 Monthly reports and invoices up to 12.

Task 1.2: Kick-off Meeting
Consultant will initiate the Project with one (1) in-person Kickoff Meeting to discuss overall work plan, tasks, schedule, meetings, resources, and other coordination items. It is assumed that the meeting will be four (4) hours in duration and attended by six (6) Consultant staff members.

Deliverables:
 Meeting agenda and minutes.

Task 1.3: Biweekly and Coordination Meetings
Consultant will attend virtual biweekly meetings with City to discuss any issues and questions, and to provide progress status update. It is assumed that each meeting will be one (1) hour in duration and will be attended by four (4) Consultant’s staff. Consultant will also participate in coordination meetings with City as required – up to 40 hours per month of meeting time is assumed.

Deliverables:
 Meeting agenda and minutes.

Task 2: Development of Conceptual Design Report (CDR)
Consultant will develop Draft and Final CDRs as described below:

Task 2.1: Development of Draft CDR
The contents of Draft CDR will include:
 Chapter 1: Introduction and Project Overview:
­ Provides background information and discusses Project goals.  Chapter 2: Project Site and Existing Conditions:
­ Describes proposed plant location/boundaries and approximate service area.  Chapter 3: Plant Effluent Quality Requirements:
­ Describes effluent quality goals and corresponding regulatory requirements. ­ Identifies permitting agencies involved.

Page 121 of 143 ends

PAGE | 3
 Chapter 4: Design Wastewater Flows and Characteristics:
­ Provides analysis of anticipated flows (raw data provided by others) and estimate of wastewater characteristics to determine design flows and constituents’ concentration for sizing of downstream unit processes.
 Chapter 5: Evaluation of Treatment Trains:
­ Two liquid treatment trains will be developed and compared qualitatively: conventional secondary/tertiary treatment and Membrane Bioreactor (MBR) system. The recommended treatment train, as approved by City, will be used as the basis for developing the remaining CDR chapters.
­ Solids handling will only include onsite storage, for hauling to a nearby regional facility for further processing.
 Chapter 6: Treatment Train Design Criteria, Sizing, and Layout:
­ Specifies each unit process and associated equipment, and provides corresponding design criteria, and sizing and redundancy information.
­ Provides plant process flow diagram, preliminary hydraulic profile, and preliminary facility layout.
 Chapter 7: Electrical Design Requirements:
­ Specifies code and/or design requirements for electrical components, including electrical system studies, harmonic mitigation, utility coordination, standby power system, reliability and safety, electrical networking, electrical equipment selection, sizing, and ratings, lightning protection, lighting system, voltage drop, grounding, and manholes. ­ Provides overall single-line diagram.
 Chapter 8: Instrumentation and Controls (I&C) Design Requirements:
­ Describes design approach for process control network, and networking and communications. ­ Specifies tagging convention and provides control descriptions outline, and other miscellaneous design requirements.
­ Provides control system block diagram and network routing diagram.  Chapter 9: Design and Construction Schedule:
­ Provides high-level schedule for implementation of the project under a progressive design-build approach for planning purposes.
 Chapter 10: Construction Cost Estimate:
­ Provides Class 4 construction cost estimate for the proposed WWTF per the Association for the Advancement of Cost Engineering (AACE) International.

Deliverables:
 Draft CDR (in pdf format).

Task 2.2: CDR Review Workshop
Following submittal of Draft CDR, Consultant will conduct an in-person workshop to discuss the contents of CDR and receive feedback from City’s staff. It is assumed that the workshop will be 4-hour duration and attended by six (6) Consultant’s staff.

Deliverables:
 Workshop presentation materials and minutes.

Page 122 of 143 ends

PAGE | 4
Task 3: Final Conceptual Design Report
Task 3.1: Development of Final CDR.

Consultant will develop Final CDR by updating the contents of Draft CDR based on City’s comments. This task also includes a final QA/QC review of the CDR.

Deliverables:
 Final CDR (in pdf format)
Task 4: Design-Build Procurement Planning and Documentation Consultant will facilitate procurement planning and develop documentation (Request for Qualifications [RFQ], Request for Proposals [RFP], etc.) in preparation for procurement of Design-Builder (procurement execution not included):

Task 4.1: Procurement Planning Workshop
Consultant will facilitate a 4-hour workshop to discuss the proposed procurement process, schedule, important considerations, documentation (i.e., RFQ, RFPP and DB Agreement) development, and draft RFQ and RFP evaluation criteria. Consultant will meet with City project management, procurement department and legal counsel. The minutes from workshop will document the procurement plan for preparing procurement documents and for executing the procurement for the Project. In preparation for workshop, Consultant will review the City’s existing procurement codes, policies and procedures, and review RFQs and RFPs previously utilized by the City for previous consultant and contractor procurements.

Deliverables:
 Workshop agenda, presentation materials, and minutes.

Task 4.2 - Develop Request for Qualifications (RFQ)
Consultant will prepare RFQ documents, including the solicitation document, a list of reference documents, submittal forms, and City standard procurement forms. It is assumed that an industry recognized template will be used as the basis for the RFQ with inputs from the City’s previous design-bid-build (DBB) procurement documents. Consultant will prepare draft and final RFQ solicitation documentation and meet with the City to discuss review comments.

Deliverables:
 Draft and final RFQ documentation.

Task 4.3 - Develop Request for Proposals (RFP)
Consultant will assist and/or prepare RFP documents, including the solicitation document, technical documents, proposal submittal forms, and City standard procurement forms. It is assumed that an industry recognized template will be used as the basis for the RFP with inputs from the City’s previous design-bidbuild (DBB) procurement documents. Consultant will prepare draft and final RFP solicitation documentation and meet with the City to discuss review comments.

Deliverables:
 Draft and final RFP documentation.

Page 123 of 143 ends

PAGE | 5
Task 4.4 - Develop DB Agreement Scope of Services Exhibits Consultant will develop DB scope of service exhibits that document the selected Design-Builder’s scope requirements during design, construction and startup testing/commissioning. Specifically, Consultant will develop the following exhibits:

1. Phase 1 Scope of Services that documents the Design-Builder’s responsibilities during design and cost development phase of Project including project management and coordination, site investigations, design and cost development, permitting, subcontractor procurement, and the guaranteed maximum price (GMP) proposal.

2. Owner’s Requirements Specifications that serve as the City’s Phase 2 (construction phase) general requirements (i.e., owner’s Division 1 specifications) that document the Design-Builder’s responsibilities during the construction phase of the Project including project management and coordination, quality control, schedule and cost management and reporting, record keeping, temporary facilities requirements, startup/commissioning responsibilities, etc. The City’s existing DBB general requirements specifications will be used as basis for developing specifications specific to the Project.

Consultant will meet with City during four (4), 2-hour coordination meetings to discuss development of DB scope of services documents. Consultant will review DB Agreement prepared by City’s legal counsel, provide comments, and participate in two (2), 2-hour coordination meeting to discuss draft agreement.

Deliverables:
 Draft and final Design Phase Scope of Services exhibit.  Draft and final Owner’s Requirements Specifications.

Task 5: Project Controls Initiation
The purpose of this task is to implement the project schedule, project management information system (PMIS), budget tracking, and risk register in support of the project controls strategy for managing the Design-Build delivery. This task only includes services up to the contracting of a design build team, and does not include continued project controls support.

Task 5.1: Master Project Schedule
Consultant will establish the Master Project Schedule using Primavera P6. The Master Project Schedule will include activities and durations for all phases of the project and will be used to track and report on progress during project execution. The Master Project Schedule will be developed to support the incorporation of the Design-Builder’s schedule.

Deliverables:
 Draft and final baseline schedule (in Primavera P6)
Task 5.2: Baseline Budget and Budget Management Tool
Consultant will develop the Baseline Budget and Budget Management Tool using Microsoft Excel that includes each of the major project components and phases and provides means of monitoring financial performance in relation to the baseline budget.

Deliverables:
 Draft and final baseline budget (in MS Excel)

Page 124 of 143 ends

PAGE | 6
Task 5.3: Project Management Information System (PMIS)
Consultant will develop and configure a PMIS to be used for document management and project controls management. Consultant will conduct the following activities: deploy a Microsoft SharePoint online PMIS platform; provide City training; establish the document management approach including file/folder structures, naming conventions, and security roles/permissions; configure file locations, summary data, and reports for schedule, budget and risk management; and develop reporting dashboard.

Deliverables:
 PMIS platform with assigned user accounts and configuration for document, schedule, budget, and risk management.
 PMIS user memorandum.
 Two, 2-hour training sessions.

Task 5.4: Risk Register
Consultant will conduct 2-hour Risk Management Workshop with City and prepare a preliminary risk register that will be updated regularly as project risks are identified and addressed. The risk register will in part inform the risk allocation terms reflected in the Design-Build Agreement. The risk register will identify mitigation measures to be utilized to address each identified risk.

Deliverables:
 Draft and Final Risk Register.

Task 6: Development of Facility Renderings
This is includes developing conceptual-level 3D renderings, showing units process facilities, and buildings.

The renderings will be based on preliminary size and layout of unit processes and can be used as a public outreach tool or for educating other stakeholders. Revit, Navisworks, or similar software will be utilized for developing the renderings. This task includes a placeholder allowance of $40,000 to retain a specialty architectural subconsultant to produce high quality renderings of potential facility layouts and treatments if desired by the City.

Deliverables:
 3D renderings (in pdf format).

Task 7: Design-Build Procurement
Consultant will assist City in execution of the procurement of a Design-Builder, and support negotiations of Phase 1 contract, including the following tasks:

Task 7.1: Request for Qualifications (RFQ) Support
Consultant will support the City in administering the RFQ phase of the procurement process by providing the following services:
 Assist the City in conducting a pre-SOQ meeting with interested parties to explain project and procurement process/expectations.
 Assist the City in responding to questions received from potential DB teams regarding the RFQ/SOQ. Consultant will draft responses to questions for City review and approval and assist in issuing RFQ addenda as necessary.

Page 125 of 143 ends

PAGE | 7
 Review SOQs received from potential DB teams and prepare an SOQ Review Summary Matrix for use by the City. Consultant will determine if minimum submittal requirements have been satisfied for each SOQ and notify City accordingly.
 Consultant will prepare a scoring matrix in accordance with the scoring prescribed in the RFQ, and for use by the City in scoring SOQs submitted.

Deliverables:
 Pre-SOQ Meeting agenda, presentation materials, and minutes.  Draft and final RFQ addenda.
 Draft and final SOQ Review Summary Matrix.
 Draft and final Scoring Matrix (in Excel).

Task 7.2: Request for Proposal (RFP) Support
Consultant will support the City in administering the RFP phase of the procurement process by providing the following services:
 Facilitate one (1), four (4) hour confidential meeting with each short-listed DB team. The confidential meeting is to allow the DB teams to ask questions regarding the RFP, draft DB Agreement, project scope, and other information that the teams require to submit a responsive proposal. Assume three (3) short-listed DB teams.
 Assist the City in responding to questions received from short-listed DB teams regarding the RFP/Proposal. Consultant will draft responses to questions for City review and approval, and assist in issuing RFP addenda as necessary.
 Consultant will assist the City during interviews by preparing baseline questions, attending interview sessions, and meeting with the City to review results of interviews.  Review proposals received from potential DB teams and prepare a scoring matrix in MS Excel in accordance with the scoring prescribed in the RFP, and for use in scoring proposals submitted.

Consultant will calculate cost proposal scores.
 Consultant will assist the City with negotiating DB Agreement and Phase 1 cost with selected Design-Builder. It is expected that DB Agreement negotiations will be minimal since the short-listed DB teams will be encouraged to vet any issues with the draft DB Agreement during the RFP/Proposal process (including discussion at confidential meetings).

Deliverables:
 Confidential Meeting agenda and confidentiality form.  Draft and final RFP addenda.
 Draft and final Scoring Matrix.

Page 126 of 143 ends

PAGE | 8
Fee Estimate
The estimated fee to perform the above scope of work is as follows:
 Task 1 Project Management, Meetings, and Workshop..................................................$154,438  Task 2 Development of Conceptual Design Report (CDR) ..............................................$344,800  Task 3 Final Conceptual Design Report.............................................................................$53,140  Task 4 Design-Build Procurement Planning and Documentation....................................$131,464  Task 5 Project Controls Initiation....................................................................................$138,352  Task 6 Development of Facility Renderings (Optional Task) .............................................$83,750  Task 7 Design Build Procurement.....................................................................................$84,372  TOTAL ..............................................................................................................$990,316 A detailed breakdown of fee estimate is included as an attachment to this document.

Schedule
Consultant anticipates that the City will issue the Notice to Proceed (NTP) by February 22, 2023. Based on this tentative date, Consultant will submit Draft CDR by June 22, 2023 (17 weeks from NTP). Consultant will submit Final CDR three weeks after receiving City’s comments on Draft CDR.

It is assumed that additional tasks for procurement planning, project controls, etc. will be completed over a seven-month period from June 2023 – January 2024. This work can be completed earlier pending the grant funding timelines.

Page 127 of 143 ends

Category
Name
Sr.

Proressional
Lead Project
Professional
Project
Professional Professional
Assistant
Professional Sr. Technician Technician
Document
Processing PECE
Task Sub
Task
Description Hourly Bill
Rate 305 290 240 175 150 168 140 125 5% 14
1 0 Project Management, Meetings, and Workshops 10 268 168 60 48 0 0 28 582 142,290 - - 1,000 3,000 8,148 154,438 1 Project Management & Administration 8 148 44 24 224 58,920 - - 500 1,500 3,136 64,056 2 Kick-off Meeting 2 16 16 8 8 2 52 11,940 - - - - 728 12,668 3 Biweekly Meetings (20) & Coordination Meetings 100 100 40 40 280 66,000 - - - - 3,920 69,920 4 Project Management Plan 4 8 12 2 26 5,430 - - 500 1,500 364 7,794 2 0 Draft Conceptual Design Report (CDR) 12 208 378 404 300 100 200 48 1,650 321,200 - - 500 - 23,100 344,800 1 Chap 1&2: Intro & Overview, Site & Ex Cond 12 2 20 20 20 40 114 19,420 - - - - 1,596 21,016 2 Chapter 3: Plant effluent quality requirements 8 16 16 40 7,520 - - - - 560 8,080 3 Chapter 4: Design Wastewater Flows and Characteristics 24 40 32 96 18,760 - - - - 1,344 20,104 4 Chapter 5: Evaluation of Treatment Trains 24 40 32 40 80 216 36,680 - - - - 3,024 39,704 5 Chapter 6: Treatment Train Design Criteria, Sizing, and Layout 40 40 80 80 240 47,200 - - - - 3,360 50,560 6 Chap 7&8: Electrical / I&C Design Requirements 24 140 140 60 40 80 484 91,980 - - - - 6,776 98,756 7 Chapter 9: Design and Construction Schedule 12 16 16 44 8,680 - - - - 616 9,296 8 Chapter 10: Construction Cost Estimate 24 160 24 24 232 53,160 - - - - 3,248 56,408 9 QA/QC and Document Processing 4 24 20 20 20 40 128 24,480 - - - - 1,792 26,272 10 Design Review Workshop 8 16 16 8 8 56 13,320 - - 500 - 784 14,604 3 0 Final Conceptual Design Report 2 36 46 46 46 20 40 24 260 49,000 - - 500 - 3,640 53,140 1 Develop Final CDR Incorporating City's Comments 24 40 40 40 20 40 204 38,520 - - - - 2,856 41,376 2 QA/QC and Document Processing 2 12 6 6 6 24 56 10,480 - - 500 - 784 11,764 4 0 Design-Build Procurement Planning and Documentation 96 80 240 0 0 0 0 40 456 115,080 - - 1,000 9,000 6,384 131,464 1 Procurement Planning Workshop 16 8 40 64 16,800 - - 500 3,000 896 21,196 2 Develop Request for Qualifications (RFQ) 16 24 40 8 88 22,440 - - - - 1,232 23,672 3 Develop Request for Proposals (RFP) 24 24 80 16 144 35,480 - - - 3,000 2,016 40,496 4 Develop DB Agreement Scope of Services Exhibits 40 24 80 16 160 40,360 - - 500 3,000 2,240 46,100 5 0 Project Controls Initiation 64 96 240 120 0 0 0 8 528 126,960 - - 1,000 3,000 7,392 138,352 1 Master Project Schedule 16 24 80 40 160 38,040 - - 500 1,500 2,240 42,280 2 Baseline Budget and Budget Management Tool 16 24 40 80 21,440 - - - - 1,120 22,560 3 Project Management Information System (PMIS) 16 24 80 80 8 208 46,040 - - 500 1,500 2,912 50,952 4 Risk Register 16 24 40 80 21,440 - - - - 1,120 22,560 6 0 Renderings 2 24 24 20 20 60 60 0 210 38,310 40,000 2,000 500 - 2,940 83,750 1 Perform renderings 2 24 24 20 20 60 60 210 38,310 40,000 2,000 500 - 2,940 83,750 7 0 Design-Build Procurement 64 48 160 0 0 0 0 16 288 73,840 - - 500 6,000 4,032 84,372 1 Request for Qualifications (RFQ) Support 24 24 80 128 33,480 - - 500 3,000 1,792 38,772 2 Request for Proposals (RFP) Support 40 24 80 16 160 40,360 - - - 3,000 2,240 45,600 Total Hours 250 760 1,256 650 414 180 300 164 3,974
Total Price 76,250 220,400 301,440 113,750 62,100 30,240 42,000 20,500 866,680 40,000 2,000 5,000 21,000 55,636 990,316 29 Palms CDR & PDB
City of Twentynine Palms
Fee Estimate
Total Fee $
Subtotal
Total Labor
Hours
Total Labor
Fee Subconsultants ODCs Travel
Labor Subconsultant & Expenses

Page 128 of 143 ends

SCHEDULE A
CWSRF STAG 1 General Fund STAG 2 ARPA
State Water Federal City Water District Federal County
Planning Earmark Surplus Contribution Earmark Contribution TOTAL Deleverable $ 1,983,212 $ 663,224 $ 500,000 $ 100,000 $ 1,275,000 $ 1,000,000 5,521,436 Date
Feasibility April 1_2022 324,886 324,886
Collection System Preliminary Design August 29_2022 288,214 288,214 Collection System Final Design (full design) May 31_2023 400,000 376,640 1,106,560 1,883,200 Environmental Initial Study July 31_2022 247,430 247,430 Wastewater Treatement Planning January 31_2023 69,929 263,224 1,000,000 1,333,153 Right of Way Acquisition September 30_2023 20,000 168,440 188,440 funding plan June 30_2022 34,003 34,003
Assessment Engineers (included in funding plan) - -
Outreach Ongoing 42,763 42,763
Polling Complete 18,750 18,750
Owners Representative Ongoing 55,840 55,840
USGS Study Five year program 1,000,000 4,757 100,000 1,104,757 TOTAL 1,983,212 663,224 500,000 100,000 1,275,000 1,000,000 5,521,436

Page 129 of 143 ends
Page 130 of 143 ends

STAFF REPORT
TO: City Council
FROM: City Manager
FOR MEETING: Mar 14 2023
SUBJECT: Strategic Planning Guidance Document.

RECOMMENDATION:

The City Council approve the Strategic Planning guidance document.

ORDER OF PROCEDURE:

Request Staff Report (City Manager Presenting)
Council Questions of Staff
Request Public Comment
Council Discussion
Motion/Second
Discussion of Motion
Call the Question
ATTACHMENTS:
• Strateigic Planning Document
2023
BACKGROUND:

Biennially, the City Council, Staff, and Community come together to discuss and plan the strategic priorities of the City that will become a policy document for resource allocation. The following are the details of the document.

This plan will serve as the roadmap that guides Staff in recommendations for resource allocations. With the guidance and leadership from the Mayor and City Council, and outstanding participation from our community, the attached goals have been identified which create the foundation for the strategic plan. In addition to the priorities attached, Staff understands the overarching strategic goals are public safety, fiscally sound government, improved infrastructure, and quality of life.

ENVIRONMENTAL:

N/A
ALTERNATIVES:

The City Council could choose to add, delete, or amend any item(s).

FISCAL IMPACT:

To Be Determined.

Page 131 of 143 ends

CITY OFFICES: COUNCIL MEMBERS
6136 ADOBE ROAD McArthur Wright, Mayor
TWENTYNINE PALMS, CA 92277 Steven Bilderain, Mayor Pro Tem (760) 367-6799 Joel A. Klink
Fax (760)367-4890 Daniel L. Mintz, Sr.
www.29palms.org Octavious Scott

CITY MANAGER
Frank J. Luckino, MPA
March 8, 2023
Mayor and Council
I am excited to present the City of Twentynine Palm’s two-year Strategic Plan. This plan will serve as the roadmap that guides staff in recommendations for resource allocations. With the guidance and leadership from the Mayor and Council, and outstanding participation from our community, the following goals have been identified which create the foundation for the strategic plan. In addition to the top ten goals, the staff understands the overarching strategic goals are public safety, fiscally sound government, improved infrastructure, and quality of life. Below is the list in no particular order.

1. New Shelter / Animal Control

2. Addition of a Sheriff Detective

3. Ballfield Lights

4. Theatre29 Expansion

5. Housing and Homeless Advisory Committee

6. Events

7. IT Improvements

8. Debt Financing to pay for major improvements

9. Revenue Augmentation to pay for debt financing

10. Emergency Response Plan
Throughout the development of the strategic plan, we received tremendous support and input from the Council and Community. The Council over a two-day period went over a variety of topics to stimulate discussion. As the staff implements the various projects, programs, and policies outlined in the strategic plan, staff will work diligently to build upon the available resources we have in our community.

Page 132 of 143 ends

To summarize the strategic priorities
• The Current Animal Shelter/Animal Control buildings are old steel buildings built by the staff and the community in the early 90s, however they have exhausted their useful life;
• With the volume of service calls and the subsequent case load of the detectives, there is a need to increase staffing in the detective bureau to more effectively investigate and solve crimes;
• Luckie Park has 24 wood ballfield lights, most of these wood poles have exceeded their life, and the remaining are at the end of life. This safety project has added benefits with installing LED lights as well that have energy savings; • Theatre 29, our local performing arts facility which is a partnership with a nonprofit has a need to expand their capacity from 90 sets to 150. It is a City owned building;
• Due to the current need to add inventory to our housing stock, and very specifically affordable housing and, in part, connected to the homeless problem, Council wants to stand up an advisory committee to review and suggest solutions to the Housing and Homeless problem;
• Event (Art, Culture, Music, and other) development, utilizing our current organizations and potentially new organizations to enhance culture and our destination;
• Very specifically the Animal Shelter and Theatre 29 expansion will exceed the ability for the City to build with a “pay as you go” approach. The City will need to augment our revenues and then leverage that revenue with a financing mechanism to build these facilities.
• To be prepared for natural and man-made disasters, the City needs to be prepared to react to these disasters to protect and inform our residents.

Special thanks to all the participants involved in this process for their time and input.

Their contributions, and the entire staff, have been, and will continue to be invaluable as we work together to accomplish the many objectives and strategies identified in the Strategic Plan.

Sincerely,
Frank J. Luckino
City Manager

Page 133 of 143 ends
Page 134 of 143 ends

STAFF REPORT
TO: City Council
FROM: Community Development Director
FOR MEETING: Mar 14 2023
SUBJECT: Budget Adjustment Request for the Public Arts Advisory Committee (PAAC).

RECOMMENDATION:

The City Council approve the budget request of the PAAC.

ORDER OF PROCEDURE:

Request Staff Report (Community Development Director
Presenting)
Council Questions of Staff
Request Public Comment
Motion/Second
Discussion of Motion
Call the Question
ATTACHMENTS:
• PAAC MID TERM BUDGET
REQUEST 030823 - EXP
EXCEL
BACKGROUND:

The Public Arts Advisory Committee (PAAC) is requesting a budget augment of $6,000.00 for the remainder of this Fiscal Year to conduct the following:
1) PAAC could distribute as part of cultural arts programming 2) Hiring a conservator to conduct a survey of the condition of the thirteen pieces of public art that is owned by the City
3) An increase in the amount of pay for the PAAC assistant 4) Hiring a grant writer to assist with the Creative Corps Grant ENVIRONMENTAL:

None.

ALTERNATIVES:

The Council could decide not to fund the budget request.

FISCAL IMPACT:
$6,000.

Page 135 of 143 ends

Budget FY Year: 2022-23 2022-23 2022-23 2022-23 2022-23 Expenses ORIG YTD PROPOSED SPENT / YTD BALANCE ADJUSTMENTS COL B to COL D

CONTRACT LABOR / ADMINISTRATIVE
PAAC Assistant (5 hrs wk @ $30 x 19 wks) 2,850.00 2,850.00 $750 from Med. Dir / $2100 from spec. projects Grantwriter (for creative corp grant) 2,000.00 2,000.00 $150 from special proj / $1850 Council Ask

TOTAL CONTRACT LABOR / ADMINISTRATIVE
Misc Administration/City Fees
HDPublishing ad/members 0.00
TOtal
GRANTS
Youth in Arts $6,000 5,000.00 5,000.00
Other grants 5,000.00 5,000.00 $1000 from YIA / $4000 Council Ask

TOTAL GRANTS

CITY ART COLLECTION MANAGEMENT
Mural Restoration $3,000 0.00 To Conservator
Sculpture Restoration
Conservator (for condition reports) 3,000.00 3,000.00 From Mural Restoration

TOTAL ART COLLECTION MANAGEMET

PROGAMMING COSTS

CONTRACT LABOR / PROGRAMMING
Publications/Signs/Graphics $300 $100.00 600.00 100.00 500.00 $300 increase from postcards Media Dir. / ArtsOutreach / Vickie $2,000 $650.00 1,250.00 650.00 600.00 $750 t0 PAAC Assist

TOTAL PROGRAMMING LABOR
Visitor Center Art Exhibitions
Reception Food $100 100.00 100.00
Music $0 0.00 0.00
Postcards x 4 art shows $400 $94.61 94.61 94.61 0.00 $300 moved to pub / signs / graphics (bal 5.39) Stamps $0 0.00 0.00
Annual Student Art Prizes
TOTAL

PAAC MID TERM BUDGET ADJUSTMENT REQUEST
1

Page 136 of 143 ends

Rotating temproary public art commissions
art in windows in downtown
instagrammable moment
Total
Signature Annual Events
City-wide music / performance event
Special Projects $3,200 0.00
CityPoleBanners 2020-21 $0
MuralBrochures $0
CityPoleBanners (Paid late) $0
ChTrail/ArtBench Project $0

TOTAL PROGRAMMING
Contingency $0 950.00 950.00 From special projects
TOTAL $15,000 20,844.61 844.61 20,000.00
Current City Budget 15,000.00
Ask from Council 5,844.61
2

Page 137 of 143 ends
Page 138 of 143 ends

STAFF REPORT
TO: City Council
FROM: Community Development Director
FOR MEETING: Mar 14 2023
SUBJECT: Revised Mission Statement for the PAAC.

RECOMMENDATION:

The City Council adopt the Resolution determining the number of members on the Public Arts Advisory Committee (PAAC) and approve its Mission Statement.

ORDER OF PROCEDURE:

Request Staff Report (Community Development Director
Presenting)
Council Question of Staff
Request Public Comment
Council Discussion
Motion/Second
Discussion of the Motion
Call the Question
ATTACHMENTS:
• 2023-03-14 City Council
resolution for PAAC
• 2023-03-08 PAAC Mission
Statement (clean)
BACKGROUND:

A prior version of this Mission Statement was presented before the City Council on February 15th, whereas the City Council requested modifications. Like in the past version, the Mission Statement contains the following:
1) The PAAC is composed of 5 arts professionals, with an option to expand with two alternates. 2) A minimum of four members shall be residents of Twentynine Palms, with a maximum of three members residing in Wonder Valley or Desert Heights.
3) Terms of PAAC members are to be 4 years, with unlimited potential terms.

The major difference between this version and the one presented to the City Council in February is that the language of the PAAC's responsibilities have been modified to be more of an advisory nature.

ENVIRONMENTAL:

Not applicable
ALTERNATIVES:

The City Council could choose to postpone adopting the Resolution and request further modification to the Mission Statement.

Page 139 of 143 ends

FISCAL IMPACT:

Not applicable.

Page 140 of 143 ends

CITY OF TWENTYNINE PALMS

CITY COUNCIL
RESOLUTION NO. 23-

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

TWENTYNINE PALMS, CALIFORNIA, DETERMINING THE NUMBER OF

MEMBERS OF THE PUBLIC ARTS ADVISORY COMMITTEE (PAAC), AS

WELL AS DETERMINING THE DAY AND TIME OF MEETINGS FOR THE PAAC
WHEREAS, the City Council of the City of Twentynine Palms resolves as follows:

SECTION 1. The Public Arts Advisory Committee (PAAC) of the City of Twentynine Palms shall consist of a minimum of five (5) members but may be expanded to seven (7) members at the City Council’s discretion.

SECTION 2. The Public Arts Advisory Committee (PAAC) of the City of Twentynine Palms shall be held on the 3rd Wednesday of each month at the hour of 5:30 p.m., unless the same shall be a legal holiday, in which event such regular meeting shall be held on the next succeeding calendar day.

PASSED, APPROVED AND ADOPTED on the 14th day of March, 2023.

McArthur Wright, Mayor
ATTEST:

Cindy Villescas CMC, City Clerk
I, do hereby certify that the foregoing Resolution No. 23- was duly adopted by the City Council of the City of Twentynine Palms at a regular meeting thereof held on the 14th day of March, 2023 by the following vote:

AYES: COUNCILMEMBER:

NOES: COUNCILMEMBER:

ABSENT: COUNCILMEMBER:

ABSTAIN: COUNCILMEMBER:

Cindy Villescas CMC, City Clerk

Page 141 of 143 ends

DRAFT REVISED MISSION STATEMENT: PUBLIC ART ADVISORY COMMITTEE, March 2, 2023 1 1. THE ARTS IN TWENTYNINE PALMS GENERAL PLAN
The City of Twentynine Palms' General Plan mission statement includes the vision to create and promote its residents' economic and social well-being, guided by sustainability and adaptability principles. Further defined by the goals of:
● Developing a strong and diversified local economy with a focus on arts, cultural tourism, retail, job growth, and overall quality of life for all community members, and ● Preserving the desert environment and its natural and cultural resources for future generations. To enhance its identity as an artistic community and to celebrate and expand its vital and rich artistic legacy, the City established the Art in Public Places (APP) Program in 2004.

2. PAAC MISSION STATEMENT
The City of Twentynine Palms established Art in Public Places in 2004 as part of its Public Arts Program.

Art in Public Places is administered by the Public Arts Advisory Committee (PAAC). The Twentynine Palms City Council appoints its members who envision literary, visual, and performing arts programming; oversee public art performance and installations, support youth and the arts programs in the community, and sponsor Art in Public Places exhibitions.

The PAAC is directed toward supporting high-quality public art and performance in the City with the following objectives:
● To enrich the public environment for both residents and visitors ● To nurture, enhance, and encourage the community's participation in arts ● To enable Twentynine Palms to enhance its identity as an arts community ● To increase public access to promote an understanding and awareness of the arts In addition to developing new arts programming, the PAAC will maintain an inventory of existing permanent public art and oversee assessment and maintenance of City owned works.

3. PAAC COMMITTEE MEMBERS
Membership of the PAAC is composed of five arts professionals with an option to expand to seven members (five core members and two alternates). A minimum of four members shall be residents of Twentynine Palms. A maximum of three members may be residents of Wonder Valley, or Desert Heights Alternates may vote on items during a temporary absence of a core member, and may be considered a core member in the case of a PAAC vacancy. “Arts” shall be defined as encompassing the commonly accepted contemporary literary, visual and performing arts fields and “professional” shall be defined as having a minimum of five years experience in the field as demonstrated by activities listed on a resume. Arts professionals are defined as curators; visual and performing artists; writers, poets, architects, art critics, historians and educators, leaders of arts non profit organizations and other persons with arts backgrounds respected in their fields.

Page 142 of 143 ends

DRAFT REVISED MISSION STATEMENT: PUBLIC ART ADVISORY COMMITTEE 2 As the PAAC is a committee requiring expertise in a specific field, applications are reviewed by the chair of the PAAC and a two-member ad-hoc committee of the City Council, then referred to the City Council for appointment. The term of the appointment is four years, with four members with terms ending on even years divisible by four, and the other members’ terms ending on even years not divisible by four. PAAC members may apply for reappointment at the conclusion of their term. The number of terms are unlimited, but term limits may be established bv the City Council.

4. PUBLIC ART ADVISORY COMMITTEE RESPONSIBILITIES
The PAAC is charged with the responsibility to:

1. Be the advisory body in envisioning City initiated literary, visual and performing arts projects, work with the City Manager and the Community Development Director in determining appropriate arts project budgets and locations and to serve as the selection panel for all City initiated arts projects and events.

2. Serve as the advisory body for privately initiated literary, visual and performing arts projects and arts events requesting City funding.

3. Provide optional aesthetic and technical recommendations for literary, visual and performing arts projects for City departments and City Council.

4. Create and recommend cultural policy for the literary, visual and performing arts for the City of Twentynine Palms.

5. Nurture, enhance, and encourage the community's participation in the arts through envisioning and funding literary, visual and performing arts programming, including grants for youth and adult programming in the arts.

6. Oversee periodic assessments of permanent public art in the City collection and recommend maintenance and preservation plans and budgets to City Council.

5. PAAC MEETING DATE, TIME AND LOCATION
The public is invited to attend the meetings and participate in promoting the arts in Twentynine Palms.

The PAAC meets on the third Wednesday of each month at 5:30 p.m. in Council Chambers at City Hall or as otherwise determined by the majority vote of the PAAC.

For more information, email [email protected]

Page 143 of 143 ends
← All documents from this meeting