4810-6766-7665.8
19 14. Severability. In case any one or more of the provisions contained herein shall for any reason be held to be invalid, illegal or unenforceable in any respect, such invalidity, illegality or unenforceability shall not affect any other provision hereof.
15. STATE LAW GOVERNS. THE VALIDITY, IN INTERPRETATION AND
PERFORMANCE OF THIS PURCHASE CONTRACT SHALL BE GOVERNED BY THE LAWS OF THE STATE OF CALIFORNIA.
16. No Assignment. The rights and obligations created by this Purchase Contract shall not be subject to assignment by the Underwriter, the Authority or the City without the prior written consent of the other party hereto.
Attachment 6
4810-6766-7665.8
S-1
PURCHASE CONTRACT
RBC CAPITAL MARKETS, LLC
By:
Managing Director
Accepted as of the date
first stated above:
CITY OF UKIAH
By:
___________
UKIAH PUBLIC FINANCING AUTHORITY
By:
________
Attachment 6
4810-6766-7665.8
A-1
EXHIBIT A
$________
UKIAH PUBLIC FINANCING AUTHORITY
ELECTRIC REVENUE BONDS, SERIES 2022
Maturity
(March 1)
Principal
Amount ($)
Interest Rate Yield Price 10% Of
Maturity
Sold
C Priced to par call date of ____, 20___
Attachment 6
4810-6766-7665.8
B-1
EXHIBIT B
(FORM OF SUPPLEMENTAL OPINION OF BOND COUNSEL)
Upon the initial issuance of the Bonds, Jones Hall, Bond Counsel, proposes to deliver a supplemental opinion to the Underwriter in substantially the form set forth below:
________, 2022
RBC Capital Markets, LLC
777 S. Figueroa Street, Suite 850
Los Angeles, California 90017
Re: Ukiah Public Financing Authority
Electric Revenue Bonds, Series 2022
Ladies and Gentlemen:
We have acted as Bond Counsel in connection with the issuance by the Ukiah Public Financing Authority (the “Authority”), a joint exercise of powers agency organized and existing under the laws of the State of California, of $________ aggregate principal amount of Ukiah Public Financing Authority Electric Revenue Bonds, Series 2022 (the “Bonds”), under and pursuant to the provisions relating to the joint exercise of powers found in Chapter 5 of Division 7 of Title 1 of the Government Code of the State of California, as amended (the “Government Code”) and Article 11 of Chapter 3 of Part 1 of Division 2 of Title 5 of the Government Code (collectively, the “Act”), and under and pursuant to the Indenture of Trust (the “Indenture”), dated as of ________, 2022 by and between the Authority and The Bank of New York Mellon Trust Company, N.A., as trustee. Capitalized terms used herein and not defined herein shall have the meanings ascribed thereto in the Indenture.
On the date hereof, we delivered to the Authority our opinion relating to, among other things, the validity of the Bonds and the Indenture (the “Approving Opinion”). You are authorized to rely upon the Approving Opinion as if addressed to you.
Based upon the foregoing and our review of such other information, documents and matters of law as we considered necessary and in reliance on the foregoing, as appropriate, we are of the opinion that:
(i) The Purchase Contract, dated _______, 2022 (the “Purchase Contract”), by and among the Authority, the City of Ukiah and RBC Capital Markets, LLC. (the “Underwriter”), relating to the Bonds, has been duly authorized, executed and delivered by the Authority, and assuming due authorization, execution and delivery by you as the Underwriter, is a valid and binding agreement of the Authority enforceable in accordance with its terms; (ii) The statements contained in the Official Statement dated _______, 2022 for the Bonds (the “Official Statement”) under the captions “INTRODUCTION,” “PLAN OF FINANCE”, “THE BONDS,” “SECURITY FOR THE BONDS”, “BOND OWNER’S RISK”, Attachment 6
4810-6766-7665.8
B-2
“TAX MATTERS,” in APPENDIX A – “SUMMARY OF PRINCIPAL LEGAL DOCUMENTS,” and in APPENDIX D – “FORM OF OPINION OF BOND COUNSEL,” insofar as such statements purport to summarize certain provisions of the Bonds and certain provisions of the Installment Purchase Agreement, the Indenture and our Approving Opinion with respect to certain federal and state income tax matters related to the Bonds, are accurate in all material respects; and (iii) The Bonds are exempt from registration pursuant to the Securities Act of 1933, as amended, and the Indenture is exempt from qualification pursuant to the Trust Indenture Act of 1939, as amended.
The opinions expressed herein are based upon our analysis and interpretation of existing laws, regulations, rulings and judicial decisions and cover certain matters not directly addressed by such authorities. We call attention to the fact that the rights and obligations under the Purchase Contract, the Indenture, the Installment Purchase Agreement and the Bonds are subject to bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance or transfer and other similar laws affecting creditors’ rights, to the application of equitable principles if equitable remedies are sought, to the exercise of judicial discretion in appropriate cases and to limitations on legal remedies against public agencies in the State of California.
By delivering this letter, we are not expressing any opinion with respect to any indemnification, contribution, liquidated damages, penalty (including any remedy deemed to constitute a penalty), right of set-off, arbitration, judicial reference, choice of law, choice of forum, choice of venue, non-exclusivity of remedies, waiver or severability provisions contained in the Indenture, the Installment Purchase Agreement or the Bonds, nor are we expressing any opinion with respect to the state or quality of title to or interest in any assets described in or as subject to the lien of the Indenture, the Installment Purchase Agreement or the Bonds, or the accuracy or sufficiency of the description of such assets, or the remedies available to enforce liens on, any such assets.
Except as expressly set forth in the Approving Opinion, we express no opinion regarding any tax consequences with respect to the Bonds. No opinion is expressed herein with respect to the compliance with, or applicability of, any “blue sky” laws of any state as they relate to the offer or sale of the Bonds.
This opinion is limited to matters governed by the laws of California and federal securities laws, and we assume no responsibility with respect to the applicability or the effect of the laws of any other jurisdiction.
This letter is being furnished to you solely for your benefit in connection with your purchase of the Bonds in accordance with the Purchase Contract and is not to be used, circulated, quoted or otherwise referred to or relied upon for any other purpose or by any other person without our prior written consent. This letter is not intended to and may not be relied upon by owners of the Bonds or any beneficial interest therein or any other party to which it is not addressed. No attorney-client relationship has existed or exists between the Underwriter and our firm in connection therewith or by virtue of this letter.
Respectfully submitted,
Attachment 6
4810-6766-7665.8
C-1
EXHIBIT C
(FORM OF DISCLOSURE COUNSEL OPINION)
________, 2022
RBC Capital Markets, LLC
777 S. Figueroa Street, Suite 850
Los Angeles, California 90017
Re: $_______ Ukiah Public Financing Authority Electric Revenue Bonds, Series 2022 Ladies and Gentlemen:
We have acted as disclosure counsel for the City of Ukiah (the “City”) in connection with the issuance of the above-referenced bonds (the “Bonds”). The Bonds are being purchased by you pursuant to a Bond Purchase Contract, dated _______, 2022 (the “Purchase Contract”), by and among the Ukiah Public Financing Authority (the “Authority”), the City and you, as the underwriter of the Bonds (the “Underwriter”). All capitalized terms used herein and not defined herein shall have the meanings ascribed thereto in the Purchase Contract.
In rendering the advice contained herein, we have examined originals or copies certified or otherwise identified to our satisfaction of: (i) the Purchase Contract; (ii) the executed Indenture of Trust, dated as of ________, 2022, by and between the Authority and The Bank of New York Mellon Trust Company, N.A.; (iii) the Installment Purchase Agreement, dated as of ________, 2022 (the “Installment Purchase Agreement”), by and between the City and Authority; (iv) the Continuing Disclosure Certificate of the City dated ________, 2022 (the “Continuing Disclosure Certificate”); (v) the Preliminary Official Statement dated ________, 2022 and the Official Statement, dated _______, 2022 (collectively, the “Official Statement”) relating to the Bonds; (vi) the minutes of the Board of Directors for the period January 1, 2019 through ______, 2022, and (vii) the letters, certificates, and opinions delivered to you pursuant to the provisions of the Purchase Contract, including, but not limited to, Section 8(e) thereof. We have not reviewed, and we do not assume any responsibility for any electronic version of the Official Statement and for all purposes of this letter, we have assumed that any electronic version of the Official Statement conforms in all respects to the printed version of the Official Statement.
The conclusions expressed herein are based on an analysis of existing laws, regulations, rulings and court decisions and cover certain matters not directly addressed by such authorities. Such conclusions may be affected by actions taken or omitted or events occurring after the date hereof. We have not undertaken to determine, or to inform you or any other person, whether any such actions are taken or omitted or whether such events do occur or any other matters come to our attention after the date hereof. We have assumed, but not independently verified, that the signatures on all documents, letters, opinions and certificates which we have examined are genuine, that all documents submitted to us are authentic and were duly and properly executed by the parties thereto and that all representations made in the documents that we have reviewed are true and accurate. We have assumed, without Attachment 6
4810-6766-7665.8
C-2
independent verification, the accuracy of the factual matters represented, warranted or certified in the documents, and of the legal conclusions contained in any opinions referenced in the Official Statement.
By delivering this letter, we are not expressing any opinion with respect to any indemnification, contribution, liquidated damages, penalty (including any remedy deemed to constitute a penalty), right of set-off, arbitration, judicial reference, choice of law, choice of forum, choice of venue, nonexclusivity of remedies, waiver or severability provisions contained in the Purchase Contract, Indenture, the Installment Purchase Agreement, the Continuing Disclosure Certificate, the Bonds or any document referenced in the Official Statement, nor are we expressing any opinion with respect to the state or quality of title to or interest in any assets described in or as subject to the lien of the Purchase Contract, Indenture, the Installment Purchase Agreement, the Continuing Disclosure Certificate or the Bonds or the accuracy or sufficiency of the description contained therein of, or the remedies available to enforce liens on, any such assets under the Purchase Contract, Indenture, the Installment Purchase Agreement, the Continuing Disclosure Certificate or the Bonds. Our services as disclosure counsel to the City did not involve the rendering of financial or other non-legal advice to you, the City, the Authority or any other party to the transaction.
Although we have not undertaken to determine independently or verify and are not passing upon and do not assume responsibility for, the accuracy, completeness or fairness of the statements contained in the Official Statement, and are therefore unable to make any representation to you in that regard, we have participated in conferences prior to the date of the Preliminary Official Statement and the Official Statement with your representatives, including separate counsel retained by you, and representatives of the City and the Authority, including the City’s General Counsel, the Authority’s General Counsel, NHA Advisors, municipal advisor to the City and the Authority, and others, during which conferences the contents of the Preliminary Official Statement and the Official Statement and related matters were discussed. Based upon the information made available to us in the course of our participation in such conferences as disclosure counsel to the City, our review of the documents referred to above, our reliance on the oral and written statements of the City and others, the documents, certificates, instructions and records and the opinions of counsel described above and our understanding of applicable law, and subject to the limitations on our role as disclosure counsel to the City, we advise you as a matter of fact but not opinion that no information has come to the attention of the attorneys in the firm performing services for the City as disclosure counsel on this matter which caused us to believe that the Official Statement as of its date contained, or as of the date hereof contains, any untrue statement of a material fact, or as of its date omitted, or as of the date hereof omits, to state a material fact required to be stated therein or necessary to make the statements therein, in light of the circumstances under which they were made, not misleading in any material respect (except that we express no view with respect to: (i) the expressions of opinion, the assumptions, the projections, estimates and forecasts, the charts, the financial statements or other financial, numerical, economic, demographic or statistical data, or assessed valuations contained in the Official Statement; (ii) any CUSIP numbers or information relating thereto; (iii) any information with respect to the Insurer, the Policies, or the Surety Bonds, or any information relating to The Depository Trust Company and its book-entry system; (iv) any information contained in the appendices to the Official Statement; (v) any information incorporated by reference into the Official Statement; (vi) the City’s compliance with its obligations to provide notice of the events described in part (b)(5)(i)(C) of Rule 15c2- 12 promulgated under the Securities Act of 1934 (“Rule 15c2-12”) or to file annual reports described in part (b)(5)(i)(A) of Rule 15c2-12; (vii) any information with respect to the Underwriter or underwriting matters with respect to the Bonds, including but not limited to information under the caption “UNDERWRITING”; and (viii) any information with respect to the ratings on the Bonds and the rating agencies referenced therein, including but not limited to information under the caption “RATING”. Finally, we advise you Attachment 6
4810-6766-7665.8
C-3
that, other than reviewing the various certificates and opinions required by Section 8(e) of the Purchase Contract, we have not taken any steps since the date of the Official Statement to verify the accuracy of the statements contained in the Official Statement as of the date hereof. No responsibility is undertaken or opinion rendered with respect to any other disclosure document, materials or activity, or as to any information from another document or source referred to by, or incorporated by reference in, the Official Statement.
By acceptance of this letter you recognize and acknowledge that: (i) the negative assurance above is not an opinion and is based on certain limited activities performed by specific attorneys in our firm in our role as disclosure counsel to the City; (ii) the scope of the activities performed by such attorneys in our role as disclosure counsel to the City and for purposes of delivering such negative assurances were inherently limited and do not purport to encompass all activities necessary for compliance by you or others in accordance with applicable state and federal securities laws; and (iii) the activities performed by such attorneys in our role as disclosure counsel to the City rely in part by representations, warranties, certifications and opinions of other parties to the transaction, including representations, warranties and certifications made by the City.
This letter is being furnished to you solely for your benefit in connection with your purchase of the Bonds in accordance with the Purchase Contract and is not to be used, circulated, quoted or otherwise referred to for any other purpose without our prior written consent. No attorney-client relationship has existed or exists between our firm and you in connection with the issuance of the Bonds or by virtue of this letter. We note you were represented by separate counsel retained by you in connection with the transaction described in the Official Statement. This letter is limited to matters governed by the laws of the State of California and federal securities laws, and we assume no responsibility with respect to the applicability or the effect of the laws of any other jurisdiction.
Our engagement as disclosure counsel to the City terminates as of the date hereof, and we have not undertaken any duty, and expressly disclaim any responsibility, to advise you as to events occurring after the date hereof with respect to the Bonds or other matters discussed in the Official Statement.
This letter is not intended to, and may not, be relied upon by owners of the Bonds, the owners of any beneficial ownership interest in the Bonds or by any other party to whom it is not addressed.
Respectfully submitted,
Attachment 6
4810-6766-7665.8
D-1
EXHIBIT D
(FORM OF DISTRICT COUNSEL OPINION)
________, 2022
RBC Capital Markets, LLC
777 S. Figueroa Street, Suite 850
Los Angeles, California 90017
Re: $_______ Ukiah Public Financing Authority Electric Revenue Bonds, Series 2022 Ladies and Gentlemen:
We are acting as general counsel to the City of Ukiah (the “City”) in connection with the matters referred to herein. In arriving at the opinions expressed below we have examined and are familiar with the following documents: (i) documents relating to the existence, organization and operation of the City provided to us by the City; (ii) the City Closing Certificate dated December , 2020 and executed by the City’s General Manager regarding the City and the above referenced transaction; (iii) the executed Indenture of Trust, dated as of ________, 2022, by and between the Authority and The Bank of New York Mellon Trust Company, N.A. (the “Indenture”); (iv) the Bond Purchase Contract, dated _______, 2022 (the “Purchase Contract”), by and among the Authority, the City and you, as the underwriter of the Bonds (the “Underwriter”), the Installment Purchase Agreement, dated as of ________, 2022 (the “Installment Purchase Agreement”), by and between the City and the Ukiah Public Financing Authority (the “Authority”), and the Continuing Disclosure Certificate of the City dated ________, 2022 (the “Continuing Disclosure Certificate”) (collectively the “City Documents”); (v) all necessary documentation of the City relating to the authorization, execution and delivery of the City Documents; and (vi) the Preliminary Official Statement dated ________, 2022 and the Official Statement, dated _______, 2022 (collectively, the “Official Statement”) relating to the above referenced bonds (the “Bonds”).
In rendering our opinions herein we have relied only on our examination of the foregoing documents, and we have made no independent verification of the factual matters set forth in such documents. In addition, we have relied on discussions with the officers and Interim General Manager of the City and information made available in the ordinary course of business in our role as general counsel to the City. In rendering the opinions expressed below, we have assumed, but not independently verified, that the signatures on all documents which we have examined are genuine.
Based upon the foregoing, and subject to the qualifications set forth below, we are of the opinion that:
1. The City is duly organized as a [______________ under California law].
Attachment 6
4810-6766-7665.8
D-2
2. The City Documents have been duly authorized, executed and delivered by the City and the City has full right, power and authority to carry out and consummate all transactions contemplated by the City Documents as of the date of the Official Statement and as of the date hereof.
3. The resolutions of the City approving and authorizing the execution and delivery of the City Documents, and approving the Official Statement, have been duly adopted at a meeting of the governing body of the City, which was called and held pursuant to law and with all public notice required by law and at which a quorum was present and acting throughout and the resolutions are in full force and effect and have not been modified, amended or rescinded.
4. Based on the information made available to us in our role as general counsel to the City, and without having undertaken to determine independently or assume any responsibility for the accuracy, completeness or fairness of the statements contained therein, the information in the Official Statement under the captions “LITIGATION — The City,” and in Appendix A under the caption “Litigation,” is true and accurate to the best of our knowledge at and as of the date of the Official Statement and at and as of the date hereof.
5. Based on information made available to us in our role as general counsel to the City, we know of no litigation, proceeding, action, suit, or investigation (or any basis therefor) at law or in equity before or by any court, governmental agency or body, pending or, to our best knowledge, threatened, against the City challenging the creation, organization or existence of the City, or the validity of the City Documents or seeking to restrain or enjoin the Series 2022 Installment Payments (as such term is defined in the Installment Purchase Agreement) or in any way contesting or affecting the validity of the City Documents or any of the transactions referred to therein or contemplated thereby, or contesting the authority of the City to enter into or perform its obligations under any of the City Documents, or under which a determination adverse to the City would have a material adverse effect upon the financial condition or the revenues of the City, or which, in any manner, questions or affects the right or ability of the City to enter into the City Documents or affects in any manner the right or ability of the City to make the Series 2022 Installment Payments.
The opinions expressed herein are based upon our analysis and interpretation of existing laws, regulations, rulings and judicial decisions and cover certain matters not directly addressed by such authorities. We call attention to the fact that the rights and obligations under the City Documents and the Bonds are subject to bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance and other similar laws affecting creditors’ rights, to the application of equitable principles if equitable remedies are sought, to the exercise of judicial discretion in appropriate cases and to limitations on legal remedies against public agencies in the State of California.
By delivering this letter, we are not expressing any opinion with respect to any indemnification, contribution, liquidated damages, penalty (including any remedy deemed to constitute a penalty), right of set-off, arbitration, judicial reference, choice of law, choice of forum, choice of venue, nonexclusivity of remedies, waiver or severability provisions contained in the Indenture, the Purchase Contract, the Installment Purchase Agreement, the Continuing Disclosure Certificate, the Bonds or any document referenced in the Official Statement, nor are we expressing any opinion with respect to the state or quality of title to or interest in any assets described in or as subject to the lien of the Indenture, the Purchase Contract, the Installment Purchase Agreement, the Continuing Disclosure Certificate or the Bonds or the accuracy or sufficiency of the description contained therein of, or the remedies available to enforce liens on, any such assets under the Indenture, the Purchase Contract, the Installment Purchase Agreement, the Continuing Disclosure Certificate or the Bonds. Our services as Attachment 6
4810-6766-7665.8
D-3
general counsel to the City did not involve the rendering of financial or other non-legal advice to you, the City, the Authority or any other party to the transaction.
This opinion is furnished by us to you solely for your benefit and we are not assuming any professional responsibility to any other person whomsoever. This opinion is not to be used, circulated, quoted or otherwise referred to for any other purpose.
Very truly yours,
Attachment 6
4810-6766-7665.8
E-1
EXHIBIT E
(FORM OF AUTHORITY COUNSEL OPINION)
________, 2022
RBC Capital Markets, LLC
777 S. Figueroa Street, Suite 850
Los Angeles, California 90017
Re: $_________ Ukiah Public Financing Authority Electric Revenue Bonds, Series 2022 Ladies and Gentlemen:
We are acting as counsel to the Ukiah Public Financing Authority (the “Authority”) in connection with the matters referred to herein. In arriving at the opinions expressed below we have examined and are familiar with the following documents: (i) documents relating to the existence and organization of the Authority provided to us by the Authority; (ii) the Authority Closing Certificate dated ________, 2022 and executed by the Authority’s Executive Director regarding the Authority and the above referenced transaction; (iii) the Bond Purchase Contract, dated _______, 2022 (the “Purchase Contract”), by and among the Authority, the City and you, as the underwriter of the Bonds (the “Underwriter”), the executed Indenture of Trust, dated as of ________, 2022, by and between the Authority and The Bank of New York Mellon Trust Company, N.A. and the executed Installment Purchase Agreement, dated as of ________, 2022, by and between the Authority and the City of Ukiah, (collectively the “Authority Documents”); (iv) all necessary documentation of the Authority relating to the authorization, execution and delivery of the Authority Documents; and (v) the Preliminary Official Statement dated ________, 2022 and the Official Statement, dated _______, 2022 (collectively, the “Official Statement”) relating to the above referenced bonds (the “Bonds”).
In rendering our opinions herein we have relied only on our examination of the foregoing documents, and we have made no independent verification of the factual matters set forth in such documents. In addition, we have relied on discussions with the officers and Executive Director of the Authority and information made available in the ordinary course of business in our role as counsel to the Authority. In rendering the opinions expressed below, we have assumed, but not independently verified, that the signatures on all documents which we have examined are genuine.
Based upon the foregoing, and subject to the qualifications set forth below, we are of the opinion that:
1. The resolutions of the Authority approving and authorizing the execution and delivery of the Authority Documents and approving the Official Statement have been duly adopted at a regular Attachment 6
4810-6766-7665.8
E-2
meeting of the governing body of the Authority, which was called and held pursuant to law and with all public notice required by law and at which a quorum was present and acting throughout, and the resolutions are in full force and effect and have not been modified, amended or rescinded.
2. Based on the information made available to us in our role as counsel to the Authority, and without having undertaken to determine independently or assume any responsibility for the accuracy, completeness or fairness of the statements contained therein, the information in the Official Statement under the caption “LITIGATION — The Authority,” is true and accurate to the best of our knowledge at and as of the date of the Official Statement and at and as of the date hereof.
The opinions expressed herein are based upon our analysis and interpretation of existing laws, regulations, rulings and judicial decisions and cover certain matters not directly addressed by such authorities. We call attention to the fact that the rights and obligations under the Authority Documents and the Bonds are subject to bankruptcy, insolvency, reorganization, moratorium, fraudulent conveyance and other similar laws affecting creditors’ rights, to the application of equitable principles if equitable remedies are sought, to the exercise of judicial discretion in appropriate cases and to limitations on legal remedies against public agencies in the State of California.
By delivering this letter, we are not expressing any opinion with respect to any indemnification, contribution, liquidated damages, penalty (including any remedy deemed to constitute a penalty), right of set-off, arbitration, judicial reference, choice of law, choice of forum, choice of venue, nonexclusivity of remedies, waiver or severability provisions contained in the Purchase Contract, Indenture, the Installment Purchase Agreement, the Bonds or any document referenced in the Official Statement, nor are we expressing any opinion with respect to the state or quality of title to or interest in any assets described in or as subject to the lien of the Purchase Contract, Indenture, the Installment Purchase Agreement or the Bonds or the accuracy or sufficiency of the description contained therein of, or the remedies available to enforce liens on, any such assets under the Purchase Contract, the Indenture, the Installment Purchase Agreement or the Bonds. Our services as general counsel to the Authority did not involve the rendering of financial or other non-legal advice to you, the City, the Authority or any other party to the transaction.
This opinion is furnished by us to you solely for your benefit and we are not assuming any professional responsibility to any other person whomsoever. This opinion is not to be used, circulated, quoted or otherwise referred to for any other purpose.
Very truly yours,
Attachment 6
4810-6766-7665.8
F-1
EXHIBIT F
[FORM OF ISSUE PRICE CERTIFICATE]
$______
Ukiah Public Financing Authority
Electric Revenue Bonds,
Series 2022
The undersigned, on behalf of RBC Capital Markets, LLC (the “Underwriter”), hereby certifies as set forth below with respect to the sale and issuance of the above-captioned bonds (the “Series 2022 Bonds”).
The Underwriter, the Ukiah Public Financing Authority (the “Issuer”), and the City of Ukiah, have executed a Purchase Contract (the “Purchase Contract”) in connection with the Series 2022 Bonds on ________, 2022 (the “Sale Date”). The Underwriter has not modified the Purchase Contract since its execution on the Sale Date.
1. Sale of the Series 2022 Bonds. As of the date of this certificate, for each Maturity of the [Bonds][General Rule Maturities], the first price at which at least 10% of such Maturity was sold to the Public is the respective price listed in Exhibit A.
2. Initial Offering Price of the Hold-the-Offering-PriceMaturities. [The Underwriter offered the Hold-the-Offering Price Maturities to the Public for purchase at the respective initial offering prices listed in Schedule A (the “Initial Offering Prices”) on or before the Sale Date. A copy of the pricing wire or equivalent communication for the Bonds is attached to this certificate as Schedule B.]
As set forth in the Bond Purchase Agreement, the Underwriting Group has agreed in writing that, (i) for each Maturity of the Hold-the-Offering-Price Maturities, it would neither offer nor sell any of the unsold Bonds of such Maturity to any person at a price that is higher than the Initial Offering Price for such Maturity during the Holding Period for such Maturity (the “hold-the-offeringprice rule”) nor would they permit a related party to do so, and (ii) any selling group agreement shall contain the agreement of each dealer who is a member of the selling group, and any third-party distribution agreement shall contain the agreement of each broker-dealer who is a party to the thirdparty distribution agreement, to comply with the hold-the-offering-price rule. Pursuant to such agreements, no Underwriter has offered or sold any unsold Bonds of any Maturity of the Bonds at a price that is higher than the respective Initial Offering Price for that Maturity of the Bonds during the Holding Period.
Defined Terms.
General Rule Maturities means those Maturities of the Bonds listed in Schedule A hereto as the “General Rule Maturities.”
Attachment 6
4810-6766-7665.8
F-2
Hold-the-Offering-Price Maturities means those Maturities of the Bonds listed in Schedule A hereto as the “Hold-the-Offering-Price Maturities.” Holding Period means, with respect to a Hold-the-Offering-Price Maturity, the period starting on the Sale Date and ending on the earlier of (i) the close of the fifth business day after the Sale Date, or (ii) the date on which the Underwriters have sold at least 10% of such Hold-the-OfferingPrice Maturity to the Public at prices that are no higher than the Initial Offering Price for such Hold the Offering Price Maturity.
Issuer means Ukiah Public Financing Authority.
Maturity means Bonds with the same credit and payment terms. Bonds with different maturity dates, or Bonds with the same maturity date but different stated interest rates, are treated as separate maturities.
Public means any person (including an individual, trust, estate, partnership, association, company, or corporation) other than an Underwriter or a related party to an Underwriter.
The term “related party” for purposes of this certificate means any two or more persons who have greater than 50 percent common ownership, directly or indirectly.
Sale Date means the first day on which there is a binding contract in writing for the sale of a Maturity of the Bonds. The Sale Date of the Bonds is ________ [__], 2022.
Underwriter means (i) any person that agrees pursuant to a written contract with the Issuer (or with the lead underwriter to form an underwriting syndicate) to participate in the initial sale of the Bonds to the Public, and (ii) any person that agrees pursuant to a written contract directly or indirectly with a person described in clause (i) of this paragraph to participate in the initial sale of the Bonds to the Public (including a member of a selling group or a party to a third-party distribution agreement participating in the initial sale of the Bonds to the Public).
Other Certifications.
(d) The aggregate of the Initial Offering Prices of the Bonds is $________. (e) We have provided the attached schedules, at the direction of Bond Counsel, relating to the calculation of the arbitrage yield with respect to the Bonds. (f) We have provided the attached schedules, at the direction of Bond Counsel, relating to the calculation of the weighted average maturity of the Bonds. We have performed this calculation using the following formula: we calculated the total number of bond years and divided that number into the total initial offering price of the bonds of the offering. For purposes of calculating the total bond years, we calculated the sum of the products of each respective maturity’s initial offering price and the number of years from the dated date to each respective maturity, doing so on a 12-month, 360-day year basis.
We express no view regarding the legal sufficiency of the above computations or the correctness of any legal interpretation made by Bond Counsel. Further, notwithstanding the Underwriter having performed the calculations as set forth in the Statistics using the DBC Software, we remind you that we are not accountants or actuaries, nor are we engaged in the practice of law.
Attachment 6
4810-6766-7665.8
F-3
The representations set forth in this certificate are limited to factual matters only. Nothing in this certificate represents the Underwriter’s interpretation of any laws, including specifically Sections 103 and 148 of the Internal Revenue Code of 1986, as amended, and the Treasury Regulations thereunder. The undersigned understands that the foregoing information will be relied upon by the Issuer with respect to certain of the representations set forth in the Tax Certificate and with respect to compliance with the federal income tax rules affecting the Bonds, and by Jones Hall in connection with rendering its opinion that the interest on the Bonds is excluded from gross income for federal income tax purposes, the preparation of the Internal Revenue Service Form 8038-G, and other federal income tax advice that it may give to the Issuer from time to time relating to the Bonds RBC CAPITAL MARKETS, LLC as Underwriter
By:
Name:
Title:
Dated: __________, 2022.
To Be Attached:
EXHIBIT A — Sale Prices [same as Exhibit A in purchase contract] SCHEDULE B — Final Pricing Wire
Attachment 6
Agenda Item No: 12.a.
MEETING DATE/TIME: 2/16/2022
ITEM NO: 2022-26
AGENDA SUMMARY REPORT
SUBJECT: Receive Status Report and Consider Any Action or Direction Related to the Novel Coronavirus (COVID-19) Emergency Including Operational Preparedness and Response; Continuity of City Operations and Services; Community and Business Impacts; and Any Other Related Matters.
DEPARTMENT: City Manager /
Admin PREPARED BY: Tami Bartolomei, Office of Emergency Services Coordinator PRESENTER: Tami Bartolomei, Office of Emergency
Management Coordinator
ATTACHMENTS:
None
Summary: The City Council will receive a status report and consider any action or direction related to the Novel Coronavirus (COVID-19) Emergency including operational preparedness and response; continuity of City operations and services; community and business impacts; and any other related matters.
Background: On March 4, 2020, California Governor Gavin Newsom declared a State of Emergency in California in response to the COVID-19 pandemic.
The County of Mendocino declared a State of Emergency related to the COVID-19 on March 4, 2020.
On March 17, 2020, the City Manager, acting as the Director of Emergency Services, declared the existence of a local emergency.
On March 18, 2020, City Council approved a Resolution ratifying the proclamation declaring the existence of a local emergency.
Since the onset of the emergency, the City of Ukiah has worked to respond to the public health and safety needs of the community in cooperation with the County of Mendocino and other partners. The local response for public health is lead regionally by the County of Mendocino and the County's Public Health Officer. In addition, the City of Ukiah has worked to maintain the continuity of public services including public safety, water, sewer, electric, airport, public works, and other essential activities.
Discussion: As coronavirus “COVID-19” continues to evolve, the City of Ukiah continues to monitor the situation and respond to the emerging needs of the community. The City is in continued contact with local and state agencies, as well as community partners, hospitals, schools, and neighboring cities to ensure we have the most updated information pertaining to COVID-19 and are coordinating efforts.
Reports and/or information from the City of Ukiah's Emergency Operation Center (EOC) may include, as necessary:
* Emergency Operation Center (EOC) Status
* COVID-19 Case Updates
* Public Information Officer
* Medical Services
* School/Education
* Public Safety (Police/Fire/EMS)
* Shelter in Place Monitoring and Compliance
* Community Service Groups
* Homeless Response
* Business Impacts/Services
* Public Infrastructure/Construction Status
* City Finance
* Recovery Efforts and Planning
* Other Related matters
Staff will provide a status report to City Council and will seek direction or action on operational preparedness and response; continuity of City operations and services; community and business impacts; and any other related matters.
Go to the City's website (www.cityofukiah.com) for direct access to information related to the Novel Coronavirus (COVID-19) emergency, including local updates, City Services, Community/Resident Information, and Business Resources.
Recommended Action: Receive status report and consider any action or direction related to the Novel Coronavirus (COVID-19) Emergency including operational preparedness and response; continuity of City operations and services; community and business impacts; and any other related matters.
BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: Sage Sangiacomo, City Manager
Agenda Item No: 12.b.
MEETING DATE/TIME: 2/16/2022
ITEM NO: 2022-1295
AGENDA SUMMARY REPORT
SUBJECT: Award Professional Services Agreement to GHD Engineers, Inc. in the Amount of $239,393 to Prepare the Plans, Specifications, and Estimate for the Talmage Road Rehabilitation Project, and Approve Corresponding Budget Amendments.
DEPARTMENT: Public Works PREPARED BY: Andrew Stricklin, Associate Engineer PRESENTER: Tim Eriksen, Director of Public Works / City Engineer
ATTACHMENTS:
1. RFP Talmage Rehabilitation
2. GHD - Talmage Road Rehabilitation Project
3. GHD - Talmage Road Rehabilitation Project - Fee Proposal Summary: The City Council will consider awarding a professional services agreement to GHD in the amount of $239,393 to prepare the plans, specifications, and estimate for the Talmage Road Rehabilitation Project, and approve a corresponding budget amendment.
Background: This project is for the design of the rehabilitation of Talmage Road from Airport Park Blvd. to State Street. Design for this project will include the anticipated paving overlay of the roadway where appropriate on a highly traveled route in disrepair. To improve pedestrian travel along this roadway, as well as provide better access to the Great Redwood Trail, City staff is seeking the design of missing sections of sidewalk on both the north and south side of Talmage Road which will likely require the widening of the existing crossing over Doolin Creek as well as placement of a new pedestrian bridge over the creek near the west end of this project. Design will also include construction of all necessary pedestrian ADA curb ramps within the scope of this project.
Discussion: The City issued a request for proposals (Attachment 1) and sent it to local firms. In addition, staff posted the RFP on the City's website through eBidboard on December 16, 2021. In response to the City's RFP, two consulting firms submitted a proposal including GHD Inc. and BKF Engineers. The selection committee consisting of City staff reviewed the proposals and selected GHD as the recommended consultant to design this project. GHD's billing rates are consistent with industry standards and their proposal best fits with the request and scope of this project. GHD's proposal (Attachment 2) and the cost proposal (Attachment 3) are included with this report for reference.
GHD's cost for the proposed work is $239,393. Staff recommends award of a professional services agreement to GHD in the amount of $239,393. A subsequent budget amendment is also requested. The funding source for this project will be the Series 2022 Lease Revenue Bonds.
Throughout the design process for this project, the Complete Streets Ad Hoc (Rodin, Crane) will continue to be engaged.
Recommended Action: Award professional services agreement to GHD Engineers, Inc. in the amount of $239,393 to prepare the plans, specifications, and estimate for the Talmage Road Rehabilitation Project, and approve corresponding budget amendments.
BUDGET AMENDMENT REQUIRED: Yes
CURRENT BUDGET AMOUNT: 25200000.90410.18311: $0; 25224220.80230.18310: $0 PROPOSED BUDGET AMOUNT: 25200000.90410.18311: $239,393; 25224220.80230.18310: $239,393 FINANCING SOURCE: Series 2022 Lease Revenue Bonds
PREVIOUS CONTRACT/PURCHASE ORDER NO.:
COORDINATED WITH: Tim Eriksen, Director of Public Works / City Engineer
CITY OF UKIAH
REQUEST FOR PROPOSAL
PREPARATION OF PLANS, SPECIFICATIONS & ESTIMATE
FOR
TALMAGE ROAD REHABILITATION PROJECT
PROPOSALS DUE NOON, JANUARY 31, 2022
ATTACHMENT 1
1 REQUEST FOR PROPOSAL
TALMAGE ROAD REHABILITATION PROJECT
December, 2021
GENERAL INFORMATION/PROJECT LOCATION
The City of Ukiah has a population of 16,075 people and is located approximately 115 miles north of San Francisco, CA on the US Highway 101 corridor. Ukiah is also the retail, government, and medical service hub to an area reaching a 50-mile radius and experiences a daytime service population exceeding 35,000 people. The City of Ukiah will be using internal Capital Improvement funding for utility and street rehabilitation items.
The project limits are within the City limits of Ukiah on Talmage Road from Airport Park Blvd. to State Street approximately 1,660 LF. (Attachment “A”)
The Talmage Road Rehabilitation Project is a rehabilitation of pavement, construction of new sidewalks and addition of a pedestrian bridge approximately 40’ over a seasonal creek. Elements of this project include:
• Construction of asphalt overlay with edge grind on Talmage Rd. from Airport Park Blvd. to State St. • Construction of five-foot sidewalk on the south side of Talmage Rd. from Lewis Lane toward State St. approximately 470 LF.
• Construction of new five-foot sidewalk on the north side of Talmage Rd. from the railroad tracks to Perry St. approximately 575 LF.
• Construction and placement of a rail car bridge over Doolin Creek approximately 40’ in length. • Construction of pedestrian accessible sidewalk on existing culvert adjacent to Lewis Lane with possible widening modification to culvert or method as recommended by consultant. • New striping plan with crosswalks in thermoplastic for project limits. • Address and design any Low Impact Development features as needed per regulations.
The City of Ukiah is requesting proposals from qualified firms for the preparation of Plans, Specifications & Estimate for the Talmage Road Rehabilitation Project. Inspection and construction contract administration are not part of this request for proposal. There are no DBE goals for this project, however, DBE participation is encouraged.
SCOPE OF SERVICES
The scope of services of this project is the preparation of Plans, Specifications & Estimate for the Talmage Road Rehabilitation Project. The Consultant’s proposal shall include, but not be limited to, the following:
• Coordinate a pre-project kick-off meeting.
• Review and evaluate existing documents and data.
• Perform a topographic survey, determine location of street and railroad rights-of-way and easements, identify and locate existing street improvements and utilities to be replaced. • Submit Preliminary Plans and cost estimate to the City for review and comment at the 30% stage. • After approval of the 30% design phase by the City, the consultant shall begin final design of the project. Scope of work shall include, but not be limited to, the following: pavement rehabilitation, including geotechnical investigation as required, utility/electrical/lighting adjustments, striping, concrete and curb ramp improvements.
• Submit design plans, specifications and cost estimate to the City for review and comment at the 60%, and 90% stage.
2 • Prepare a Storm Water Pollution Prevention Plan (SWPPP) for submission to the North Coast Regional Water Quality Control Board for the purpose of obtaining coverage under the General Permit for Discharges of Storm Water Associated with Construction Activity, if the disturbed area of the project is over one acre. Proposal shall provide optional cost for preparation of SWPPP. • Provide any necessary permits with Fish & Wildlife and the Waterboard for work around the creek if required.
• Receive comments and prepare final plans, specifications and cost estimate for bid purposes. Provide one digital set of plans in both PDF and AutoCAD formats and one digital PDF set of specifications.
AutoCAD drawings will be provided to the contractor for the purposes of construction survey.
EXISTING DOCUMENTS
• Existing Sewer utilities map
• Existing Water utilities map
• Project limits map
SCHEDULE
Anticipated completion date, task, and time to complete task:
• December 2021 Issue Consultant Request for Proposal
• January 31, 2022 Proposals due (approx. 8 weeks)
• February 16, 2022 City Council Award Consultant Contract • February 2022 Kick-off meeting
• April 2022 Submit draft Conceptual Plan (30%)
• July 2022 Submit draft (60%) plans, specifications & estimate (PS&E) • September 2022 Submit draft (90%) PS&E
• October 2022 Submit final PS&E
The above scope of services and schedule does not preclude the Consultant, based on his or her project understanding and experience, from developing and proposing an alternative approach and schedule for achieving the City’s goal of a timely and successful project completion.
CONSULTANT’S PROPOSAL
Proposals shall be labeled “Talmage Road Rehabilitation Project”. Proposals shall be submitted to:
[email protected]
[email protected]
Submit (1) one electronic copy. Proposals must be received prior to noon, January 31st, 2022.
Proposals shall include as a minimum the following:
Project approach and schedule
Describe the proposed approach and procedures to be used in completing the tasks described in the Scope of Services. Include a proposed schedule showing completion of the various tasks.
Cover letter
The cover letter should include a brief overview of the specific approach and procedures the firm proposes to complete the tasks described in the Scope of Services. Please explain why the Consultant’s proposal is the best proposal for the City. The cover letter must be signed by an official authorized to bind the successful firm contractually and shall contain a statement to the effect that the proposal is a firm offer for a minimum period of thirty (30) days after the submittal date. The letter accompanying the proposal shall also provide the following: name, title, address, and telephone number of individuals with the authority to negotiate a contract and bind the consultant to the terms of the contract.
3 Project team
Describe the qualifications and experience of the firm as related to the project, and the proposed staff to be assigned to this project. Describe the qualifications and experience of any proposed sub-consultants and identify the work they will accomplish. Firms, sub-consultants and proposed staff must demonstrate experience with similar projects. Staff proposed to be in charge of the project must demonstrate significant experience supervising similar work. Describe the proposed team organization, current and previous work assignments, and man-hours budgeted for each team member. Provide the name and brief resume of the individual who will be in responsible charge of the project along with the names and brief resumes of the firm’s staff who will be assigned to the project.
Example work product
Provide a minimum of one example work product which includes an evaluation with illustration of a project with similar or comparable scope of work.
Fee proposal
Provide a fee proposal based on an hourly rate schedule with a “not to exceed” maximum cost for all work identified in the Scope of Services. Provide a tabulation of the project staff and number of work hours for each task. Indicate if travel time, mileage, and per diem will be charged. Include any sub-consultant cost.
Additionally, please identify miscellaneous costs associated with this proposal. Submit a copy of your firm’s current itemized hourly rate fee schedule.
Please submit the fee proposal in a separate email titled “Talmage Road Rehabilitation Project - Fee Proposal” to Andrew Stricklin at [email protected] References
Provide a list of similar projects for which the firm has completed similar projects with a list of at least three client references associated with these projects. Include client references for any proposed subconsultants. Provide names of contact person, addresses and telephone numbers for all client references.
Exceptions
Identify any exceptions you are proposing with respect to the Scope of Services. Additionally, if there are any exceptions to the City’s insurance requirements and/or the City’s draft professional services agreement as shown in Attachment “C,” the Consultant should list the exceptions in the proposal.
INSURANCE REQUIREMENTS
The insurance requirements are set forth in Attachment “C”.
EVALUATION OF CONSULTANT’S PROPOSAL
The following evaluation criteria and maximum points will be used in evaluating and selecting candidates:
1. Understanding of the work to be done. 30
2. Experience with similar kinds of work. 20
3. Quality of staff for work to be done. 20
4. Capability of developing innovative or advanced techniques. 10
5. Financial responsibility. 10
6. Demonstrated Technical Ability. 10
SUPPLEMENTAL REFERENCE INFORMATION
The following documents are provided for your reference:
• Location Map, Attachment “A”
• A draft professional services agreement, Attachment “B” • Insurance Requirements, Attachment “C”
RIGHT OF REFUSAL
4 The City reserves the right to reject any and all proposals without qualifications. Proposals will be considered only in their entirety. The City reserves the right to negotiate the specific requirements and costs for the Talmage Rehabilitation Project.
QUESTIONS
Questions shall be directed to:
Andrew Stricklin, Associate Engineer
(707)463-6297 [email protected]
GHD Clity of Ukiah Talmage Road Rehabilitation Project I Proposal for:
Talmage Road Rehabilitation Project
City of Ukiah
January 31, 2022
→ The Power of Commitment
ATTACHMENT 2
GHD Clity of Ukiah Talmage Road Rehabilitation Project i © GHD 2022
This document is and shall remain the property of GHD. The document may only be used for the purpose of assessing our offer of services and for inclusion in documentation for the engagement of GHD. Unauthorized use of this document in any form whatsoever is prohibited.
Proposal Evaluation
Understanding of the work to be done
− Section 2 - Understanding and Approach,
pages 3 - 10
Experience with similar kinds of work
− Section 5 - References, pages 28 - 46
Quality of staff for work to be done
− Section 3 - pages 23 - 26, Appendix A - Resumes
Capability of developing innovative or
advanced techniques
− Section 2 - Understanding and Approach, pages
3 - 10, Section 5 - References, pages 28 - 46
Financial responsibility
− Section 3 - Project Team, page 19
Demonstrated technical ability
− Section 5 - References, pages 28 - 46
Contents
1. Cover Letter 1
2 Understanding and Approach 3
Scope of Services 11
3 Project Team 19
Firm Qualifications 19
Our Subconsultant 19
Team Structure and Members 22
Key Team Member Introductions 23
4 Fee Proposal 27
Submitted in a separate email
5. References 28
6. Exceptions 47
Appendix A
Team Member Resumes
GHD Clity of Ukiah Talmage Road Rehabilitation Project ii → Cover Letter
01
GHD Clity of Ukiah Talmage Road Rehabilitation Project 1 GHD
2235 Mercury Way, Suite 150, Santa Rosa CA 95407
1 707 523 1010
January 31, 2022 Proposal No. 12571020
Mr. Andrew Stricklin, Associate Engineer
City of Ukiah – Department of Public Works
300 Seminary Avenue
Ukiah, CA 95482
RE: GHD Proposal for Talmage Road Rehabilitation Project Dear Mr. Stricklin,
The design of the Talmage Road Rehabilitation Project is an important infrastructure renewal project for the City of Ukiah (City) as it furthers the City's efforts to revitalize and renew key arterial roads that connect U.S. 101 with the South State Street corridor and the downtown area. This is a unique project with some interesting challenges and is similar in scope to the work we performed on the Redwood Business Park Transportation Improvements project and the Great Redwood Trail projects. These similar projects are located adjacent to this project, and we believe that our experience on those projects uniquely qualifies us to design this project. The City is seeking an experienced team of engineers with knowledge of the local conditions and ability to develop and deliver innovative design solutions to cost-effectively rehabilitate the existing road pavement. Bringing our recent experience on the very similar Ukiah projects, the GHD team has the knowledge, expertise, and capabilities to meet or beat the City's schedule and successfully deliver this project.
Our team has developed a thorough understanding of the key design issues and the services requested by the City for this proposal. With our knowledge of the City's goals, our team has compiled information and resources from our previous projects including City utility records, geotechnical records, and Right-of-Way mapping, as well as identified coordination needs along the Talmage Road corridor. We are confident we can deliver the right project on-time and within budget.
Our proposal demonstrates our understanding of the project. It also illustrates these strengths of our team:
Strong Team Leadership: Project Director, Matt Kennedy, PE, TE, ENV SP and Project Manager, Erik Fanselau, PE, CFM, LEED AP, are both very familiar with delivering similar projects. They are also experienced in overcoming project challenges and meeting project budget and schedule. Matt has successfully delivered numerous City of Ukiah projects, and understands how to complete projects effectively and efficiently, and to work collaboratively with City staff. Erik has over 23 years of experience with civil design and project management experience working for a variety of public agencies and share's Matt's passion for project excellence.
A Proven Team with City of Ukiah Experience: Many members of our team, including our subconsultant, have worked together on other City projects such as the Ukiah Redwood Business Park and Talmage Road Interchange, the Downtown Streetscape Improvements Projects and the Ukiah Great Redwood Trail Projects. Our familiarity working together in partnership with the City, will help streamline delivery and enable efficient performance.
Innovative Approach to Delivering the Design: As described in our Approach, we propose to perform most of the survey using GHD's Light Detection and Ranging (LiDAR) scanner, which is extremely accurate, will significantly reduce the survey cost and save time in the schedule. This innovative survey method can be used on other City projects to significantly reduce cost and shave weeks off the schedule. We are excited to share this advanced capability with you.
Extensive Roadway Replacement and Pavement Rehabilitation Experience: With over 19 years of experience, Matt Kennedy has delivered numerous successful road rehabilitation and pedestrian improvement projects. Erik Fanselau has over 23 years of experience with similar roadway projects. This leadership team has the experience to successfully deliver this project to the satisfaction of the City. We will also work with pavement enhancement product suppliers to develop options for cost-effective and long-lived improvements.
1. Cover Letter
GHD Clity of Ukiah Talmage Road Rehabilitation Project 2 Customer Service and Responsiveness: We believe the key to delivering a successful project is strong communication from start to finish. We pride ourselves on our prompt replies to City inquiries and proactive engagement. In addition, we plan to have a design workshop and frequent project update meetings with the City to make sure project challenges don't become issues and problems. Erik will have bi-weekly check-in meetings with the City and design team to discuss issues, resolutions, and design progress deliverables.
We look forward to the opportunity to continue supporting the City in improving the infrastructure and quality of life of Ukiah and encourage you to reach out with any questions about our qualifications and the approach we have presented.
This proposal is a firm offer for a minimum period of thirty (30) days after the submittal date and is signed by Matt Kennedy, a GHD official authorized to contractually bind the firm.
Sincerely,
Matt Kennedy, PE, TE, ENV SP Erik Faselau, PE, CFM, LEED AP Project Director Project Manager
+1 707 540 3376 +1 916 690 9937
[email protected] [email protected]
GHD Clity of Ukiah Talmage Road Rehabilitation Project v → Understanding and
Approach
02
GHD Clity of Ukiah Talmage Road Rehabilitation Project 3 Street and Airport Park Boulevard. New striping will also be included along with high-visibility crosswalks.
On the west end of the project, the new sidewalk along the south side of Talmage Road will be constructed along the south bank of Doolin Creek. This will require relocating the existing chain link fence on City property approximately 8 feet to the south to provide room for the sidewalk. The creek crossing will occur at the eastern boundary at the Speedway Service Station near the intersection with South State Street. It is anticipated that a used 20 to 40-foot‑long railroad flat car will be used for the bridge, similar to the bridges installed for the Great Redwood Trail creek crossings. These are available locally and have proven to be cost effective. The bridge will be set upon new abutments on each bank of the creek and handrails will be added for safety. Figure 1 shows a concept rendering of this bridge and sidewalk. To offset the in-channel work that will be necessary to construct the bridge, we anticipate that some mitigation measures will be required by resource permitting agencies. Mitigation could take the form of planting oak or other native trees along the bank to shade the creek channel, as shown in the concept rendering. Another
measure could include removal of large trash and debris items from the creek. A limited hydraulic analysis of Doolin Creek will be performed for the new bridge design to make sure the bridge is above the 100-year flood elevation. GHD’s previous hydraulic and floodplain work will be referenced.
2. Understanding and Approach
Project Understanding
The Talmage Road Rehabilitation Project consists of
the reconstruction and rehabilitation of approximately
1,660 linear feet (LF) of pavement between Airport Park Boulevard and South State Street, excluding the rail
crossing area that was improved as part of the Great
Redwood Trail. The pavement work will generally consist of an edge grind and asphalt overlay. New curb and gutter may also be needed in select areas as part of the sidewalk infill. In addition, another key goal of this project is to improve pedestrian safety along this route.
Talmage Road is a key corridor in the City as it connects to U.S. 101 and provides access to South State Street and the City core. It is classified in the General Plan as an arterial roadway, intended to move traffic into and through the
City. As a result, this street sees a high volume of vehicle traffic including heavy trucks, which creates a safety issue for bicycles and pedestrians. This is compounded due to the gap in sidewalk on the north side between Cunningham Street and Perry Street and on the south side between
Lewis Lane and the Speedway Service Station. The lack of continuity creates an ADA path of travel compliance and safety issue. We understand the importance of bicycle and pedestrian connectivity to the community. Multi-modal
circulation will be improved with the connection to the Great Redwood Trail and existing routes along South State Figure 1. Concept rendering of new pedestrian bridge
over Doolin Creek and new adjoining sidewalk.
GHD Clity of Ukiah Talmage Road Rehabilitation Project 4 To cross Doolin Creek along the north side of Talmage
Road near Lewis Lane, it will be necessary to extend the existing box culvert to provide room for the sidewalk. Figure 2 shows a concept rendering of the culvert extension. We anticipate that the box culvert extension will demolish the existing wing walls and require construction of cast-in-place concrete with dowels into the existing structure. As with the bridge construction, GHD will perform a limited hydraulic analysis to confirm hydraulic capacity and the water surface elevation. Doolin Creek is ephemeral, and it’s expected that this construction will be performed during the dry season when there is no flows in the creek. Dewatering, coffer dams and/or bypassing flows should not be necessary. Also,
the existing guardrail along the road will be removed and handrails will be provided along the back of the sidewalk.
The City of Ukiah adopted the Storm Water Low Impact
Development (LID) Technical Design Manual developed
by the City of Santa Rosa and County of Sonoma. This
manual describes the LID triggers and exemptions.
Typically, projects reconstructing or rehabilitating
pavement on arterial roadways trigger the requirement to implement LID stormwater quality improvements, and it is possible that LID stormwater quality enhancements might be needed in this project.
Approach
Our team’s approach is founded not only on our
understanding of the project but on the specific
individuals assigned to this project. Our team is highly qualified in the design and construction of roadway
rehabilitation. We bring the design expertise, local
knowledge, and pavement industry connections that will
result in the most cost-effective design solutions for the City. We are confident that the GHD team will provide the City with the information and recommendations needed to make informed decisions about the design, so the Talmage Road Rehabilitation Project is as successful as possible.
In reviewing the project and developing our approach, we have identified the following key design and construction considerations. While this is not an overly complex project, there are some important items to address during design, so environmental and permit approvals are smooth,
and construction proceeds without change orders due
to unforeseen or changed conditions. The successful
completion of this project hinges on the resolution of
these issues. Our team will address these issues using the comprehensive approach described below and within a
schedule that meets the City’s goal of constructing this project during the 2023 construction season.
Addressing Design and Construction
Challenges
We have thoroughly investigated the project and identified key design, construction and operation constraints. These challenges are documented below and will be discussed
and confirmed with the City. Mitigation/resolution options Figure 2. Concept rendering of culvert
extension and new adjoining sidewalk.
GHD Clity of Ukiah Talmage Road Rehabilitation Project 5 are also identified.
Resource Agency Permitting for Doolin Creek
Crossings
It is our expectation that the two crossing improvements over Doolin Creek will require permits through the U.S.
Army Corps of Engineers (USACE), the North Coast
Regional Water Quality Control Board (NCRWQCB), and
California Department of Fish & Wildlife (CDFW) because the improvements will involve in-channel impacts.
In a preliminary review of the California Natural Diversity Database (CNDDB), it appears that foothill yellow-legged frog may need to be addressed at the project site. It has been found on other drainages within a mile of the project site. Habitat for this species will be verified during a biological resources site investigation.
Effective environmental impact assessment and permit
acquisition requires a solid basis in science. Our staff of scientists, led by Kristine Gaspar, is recognized for experience and expertise in providing clear and concise habitat assessments, feasible cost-effective mitigation, and efficient navigation of the permit process. GHD’s
approach is to have our scientists involved early in the project, to help identify possible environmental issues and offer feedback on how to minimize impacts through design.
GHD biologists and planners prepared biological reports, relevant regulatory permit applications, and a habitat
mitigation and monitoring approach for Phase 2 and Phase 3 of the Great Redwood Trail, both of which involved new pedestrian bridges over Orrs Creek and Doolin Creek. With input from our environmental team, GHD engineers will
minimize impacts to Doolin Creek. This approach will result in productive engagements with the regulatory agencies, and a streamlined permitting process. For this project, GHD scientists will support the City by preparing necessary biological reports to support California Environmental
Quality Act (CEQA) and permit approvals, and we will lead the regulatory permitting efforts.
Bridge Hydraulic Requirements
FEMA has developed a hydraulic model for Doolin Creek,
which shows that the channel and part of Talmage Road
in the project area are in the "regulatory floodway" and in the mapped flood zone. This requires a hydraulic analysis that verifies there will be a "no net rise" in the base flood elevation (BFE) from the new pedestrian bridge and
sidewalk. Our approach is to obtain the existing hydraulic model from FEMA, perform the hydraulic analysis to
determine the bridge and sidewalk elevations that will
result in a "no-net-rise" in the FEMA regulated flood way. If the FEMA model is unavailable we will develop a duplicate effective model using the creek channel survey for the
analysis, which may be a simpler approach. The expected design will involve some widening of the creek channel
and setting the sidewalk at an elevation to maintain the flood elevation in FEMA regulated flood way. A technical memorandum will be provided to the City to be kept on file in the event of a FEMA audit. The hydraulic model will also be used to evaluate the design of the bridge and channel and develop channel scour countermeasures in the
vicinity of the bridge.
Figure 3. FEMA Flood Map
Managing Stormwater and LID Triggers
As described in the RFP, it is possible that the project could require inclusion of LID to treat and attenuate
stormwater runoff from Talmage Road before it enters
Doolin Creek. LID improvements can be expensive.
Our review of the Stormwater LID Technical Design
Manual “Project Triggers” shows that, depending on the
approach, the project could create or replace 10,000
square feet or more of impervious area, which is the
threshold where LID is required. There is about 900 feet of new sidewalk infill required, which amounts to about 4,500 square feet assuming a 5-ft wide sidewalk. The
pavement improvements could be considered a "Routine
Maintenance Activity" and be exempt from the LID
requirements. A "Routine Maintenance Activity" includes overlays, resurfacing, and/or road pavement structural
section rehabilitation (including Full Depth Reclamation (FDR)) of existing roads as well as patching activities.
Replacement of existing pedestrian ramps to maintain
compliance with current Americans with Disabilities Act (ADA) Requirements is considered routine maintenance.
With this framework in place, GHD’s approach is to qualify the project as a "Routine Maintenance Activity" by limiting new and replacement impervious area to less than 10,000
GHD Clity of Ukiah Talmage Road Rehabilitation Project 6 squre feet. This approach would also mean a Storm Water Pollution Prevention Plan (SWPPP) is not required, and a Water Pollution Control Plan (WPCP) can be used instead.
Pavement Rehabilitation Options
To meet the LID exemption, pavement rehabilitation
activities down to subgrade should be limited, and
overlays relied upon more heavily. The approach to limiting full-depth reconstruction to specific pavement failure
areas will also help keep the cost of the project down.
From our review of the existing pavement condition,
we observed some failure areas and potholes, most of
which are between the Great Redwood Trail crossing
and State Street. A few failure areas are also present
between Airport Park Boulevard and the Great Redwood
Trail crossing in the eastbound lanes. We believe a good approach is to use targeted dig-out repairs of failure areas and a mill and overlay of the remaining pavement that is still in serviceable condition. Pavement and subgrade
enhancement geotextiles or geogrids could be used in
dig‑out repairs to provide additional strength and lengthen the design life, if desired.
As a part of our proposal, GHD engaged two pavement
and subgrade enhancement product suppliers to assist
us in identifying conceptual pavement rehabilitation
methods that could be implemented to reduce cost and
extend the design life of the road section. We discussed the project with representatives at Pacific GeoSource and at TenCate Geosynthetics. Both companies manufacture,
design, and provide guidance on the proper selection of subgrade and pavement enhancement solutions to reduce
cost and increase the design life of asphalt pavements.
Both companies have assisted in the design of and
provided products on previous Ukiah projects, including the Redwood Business Park Transportation Improvement
project and the Downtown Streetscape Phase 1 project.
Pacific GeoSource is also the supplier of the FORTA-FI
Asphalt Reinforcement Fibers (aramid fibers).
The incorporation of reinforcement systems into flexible pavement leads to stronger and more sustainable roads,
including these benefits:
− Increased Structural Capacity
− Reduced Life-Cycle Costs
− Reduced Maintenance
− Minimized Reflective Cracking
− Extended Pavement Life
− Accelerated Construction Times
We know from our previous design work on Talmage
Road, Airport Park Boulevard, and the Great Redwood
Trail that subgrade soils are alluvial and consist of fine- to course-grained sandy silts, silty clays and clays with some interspersed gravels. Widespread lateral continuity is
expected, but some variability could occur near Doolin
Creek and soils could be moderately expansive due to clay content. Groundwater is typically at least 10 feet deep, but has been observed shallower during the rainy season and near streams. R-values from soil tests performed for the Redwood Business Park Improvements project are
between 57 and 65, and soils are generally considered
non-expansive. The original pavement section on Talmage Road within the Caltrans right of way was 4” Hot MIx
Asphalt (HMA) on 8 inches of cement-treated base (CTB)
and 6 inches of aggregate subbase. The section thickness between Airport Park Boulevard and South State Street
may be the same, but should be confirmed during design.
In developing preliminary pavement rehabilitation options, we considered a 20-year design life, a Traffic Index (TI) between 9.0 and 11.0 and a conservative subgrade R-value of 40. This TI range is generally associated with an arterial street. For reference, the City of Santa Rosa requires a minimum TI of 9.0 for arterial street pavement designs, and a minimum pavement section of 5.4” of HMA over
9.6” of Class 2 Aggregate Base (CL2AB). Santa Rosa also requires an R-value of 5 (weak soils) if R-value testing is not performed. A low R-value can significantly increase the section thickness and construction cost. Using
these parameters, a conventional pavement section is as summarized in the table below.
Traffic Index HMA
Thickness (in)
CL2AB
Thickness (in)
9.0 4.5 9.6
10.0 6.6 10.2
11.0 7.2 11.4
Table 1. Conventional Pavement Sections
Incorporating
subgrade
enhancement
geotextiles or
geogrids into the
design of dig-out
repairs can further
strengthen the
subgrade and reduce
the section thickness.
Including pavement interlayers can also be considered and are particularly useful in strengthening existing pavement where the desired improvement is a mill and overlay. A
GHD Clity of Ukiah Talmage Road Rehabilitation Project 7 cost analysis will be performed to determine whether it’s cost-effective to use these methods in this project
We believe an edge grind, crack-seal and overlay
approach like what was done for the southern portion of Airport Park Boulevard will provide long pavement life and help meet the LID exemption. In the Redwood Business
Transportation Improvements Project, the southern
portion of Airport Park Boulevard was in good condition but was too thin and didn’t meet the expected heavy
vehicle load rating. Rather than reconstruct the pavement section, we designed a special overlay that added the
required strength and mitigated future reflective cracking.
Below is a summary of what was constructed:
1. An 8-foot wide edge grind was performed to the gutter lip and all existing cracks were sealed.
2. Next, a leveling course was placed over the pavement to address any grade corrections needed and achieve
an acceptable cross-slope for drainage.
3. A paving grid was then installed across the entire
roadway to increase the tensile strength of the
pavement and mitigate reflective cracking before a
final overlay was installed.
FORTA-FI Asphalt Reinforcement Fibers (aramid fibers)
were also used in the hot mix design for added tensile
strength. The resulting pavement section achieved a Traffic Index (TI) of 10.5, which is the same as or very similar to the TI for this segment of Talmage Road. This project is an excellent candidate for the same approach. However, prior to the overlay, limited dig-out repairs should be performed to first address the failure areas and potholes. Figure 4 below shows an example of what this type of overlay on
Talmage Road could look like for this project.
Including a paving interlayer in the overlay would help maintain most of the existing pavement that’s still
serviceable, improve the finished condition, and provide a longer life. A paving mat would provide waterproofing, add tensile strength, delay reflective cracking, and extend pavement life. Tencate Geosynthetics and GeoSource
have a lot of options when it comes to paving mats and
paving grids, and we will explore these options and costs with the City during the early design.
While developing our proposal, we asked about the need
for geotechnical engineering for pavement design and
the City requested it be included as an optional service.
For this project, confirming the existing pavement section thickness and the subgrade R-value during design is
important to developing the most cost-effective overlay design for pavement performance and to meet the
LID exemption. Higher actual subgrade R-values and
confirmation of the existing pavement section results in less conservative and lower cost rehabilitation options.
We have included an optional task to perform borings and obtain subgrade soil samples for R-value testing.
Construction Phasing to Minimize Disruption
Talmage Road is an important arterial street connecting the U.S. 101 with Airport Park Boulevard and South State Street, which are key truck delivery routes. As such, it is important that the team be aware of and consider the potential negative impacts transportation disruptions
can have on the movement of people and goods. Ideally,
disruptions of service to businesses around the project area will be minimized by a thoughtful traffic control plan prepared and executed by the contractor. Some public
outreach should be performed to keep the community
informed and aware of the project timing and short-term construction impacts the project will have. We understand that the City will handle the majority of the public
outreach efforts. GHD can provide additional support
for community meetings and other outreach activities in advance of construction, if needed.
The City typically allows construction from approximately 7:00 am to 7:00 pm, with night work upon City approval, if needed. Night work is not anticipated, but could benefit Figure 4. Talmage Road Overlay Example
GHD Clity of Ukiah Talmage Road Rehabilitation Project 8 Sheet # Drawing # Title
10-13 C-105 to
C-108,
Pavement Restoration
Plans
14-18 C-301 to
C-305
Cross Sections
19-22 P-101 to
P-104
Signing and Striping Plans
23 C-401 Pedestrian Ramp Details
24 C-501 Civil Details 1
25 C-502 Civil Details 2
26 S-001 Structural Notes, Symbols
and Abbreviations
27 S-002 General Structural Details
28 S-101 Pedestrian Bridge Plan and
Section
29 S-102 Culvert Extension Plan and
Section
30 S-501 Structural Details
Effective Communication
Communication throughout the design process is key to
meeting the desired project goals. With this in mind, we have allowed adequate effort for review meetings, coordination with the City’s project manager, and coordination with the City’s street and drainage maintenance team. Input from the department responsible for maintenance of streets is very important for the design team so the project minimizes maintenance requirements and addresses lessons learned
on previous projects.
GHD will meet with City staff to obtain review comments following each submittal, as well as in biweekly status calls. These meetings will be tailored to the needs of City staff. We will place a priority on making these meetings as efficient as possible to be sensitive to the demanding schedules of City personnel. GHD will prepare meeting
agendas and meeting minutes for the City.
Survey and Mapping
One of the most critical aspects of a project is developing an accurate base map for design and doing so in an
efficient, accurate and cost-effective manner. For this project, we propose a unique approach to surveying
and base map development that rapidly and accurately
collects survey data for the entire corridor. Our innovative the project similar to what was done on the Redwood
Business Park project. Traffic control plans will be
required by the contractor following California Manual on Uniform Traffic Control Devices (MUTCD) requirements
to maximize the efficiency of construction means and
methods, while minimizing disruptions to the local
businesses and residents.
Design Development
GHD proposes to conduct a preliminary design workshop
as part of the kick-off meeting, followed by a site visit with City staff. The entire meeting and site visit would last about 3 hours. We find that having a preliminary design workshop and site visit at the start of the project provides a great opportunity for early collaboration and sharing of ideas and innovations. It increases the design team’s efficiency because we will have clear direction on how to approach key elements. It is an effective way of getting the project off to a running start, contributing to delivery efficiency.
We will also prepare a basis of design (BOD) technical
memorandum with the 30% design submittal to document
the project design criteria, applicable standards,
staging area considerations, suggested traffic handling and detours, and suggested construction sequencing.
The BOD will include discussion items from the design
workshop and confirm the design approach and permitting strategy. It will also serve as an important guide to the design team, and a reference document for both the City and design team throughout the project.
Following the City’s approval of the 30% design, GHD will commence with 60% design. Plans, Specifications, and
Estimates (PS&E) will be prepared and submitted to City review at 30%, 60% and 90%, with the 90% design being
essentially complete. Any remaining minor comments
on the 90% design would be addressed in the final PS&E
issued for bidding.
GHD has prepared the anticipated sheet index below.
Table 2. Plan Sheet Index
Sheet # Drawing # Title
1 G-001 Title Sheet
2 G-002 General Notes, Symbols,
Abbreviations
3 G-003 Typical Cross Sections
4 G-004 Alignment and Survey
Control
6-9 CD101 to
CD104
Demolition Plans
GHD Clity of Ukiah Talmage Road Rehabilitation Project 9 survey approach was developed by our Principal-inCharge, Matt Kennedy and has been used successfully on several projects, saving clients hundreds of thousands of dollars. It leverages GHD’s vehicle-mounted LiDAR
mapping system for very rapid point cloud collection on active roadways with no traffic control needed. The LiDAR scanning is supplemented with traditional survey methods to establish survey control, tie in benchmarks and
boundaries, and map utilities. The vehicle-mounted LiDAR system produces higher precision and more accurate
surveys than air-based drone LiDAR surveys, because
the precision of air-based systems diminishes with
increasing laser return distance. Vehicle-mounted LiDAR mapping is also significantly more accurate than the
aerial photogrammatic image-based methods being
used by the consultant designing the Gobbi Street
improvements. An example image of a 3D LiDAR survey
is shown in Figure 6 below. Key advantages of our unique survey approach include:
− Safety: LiDAR scanning keeps field personal out of
active traffic. Mobile scanning is completed without
traffic control or road closures. For safety, a light bar and sign on the vehicle indicates a mobile scan is in
progress, and the scanning can be done at night when
traffic is minimal.
− Speed: Complete coverage of the entire roadway with
only two passes, one for each direction. With a typical survey vehicle speed between 10-20 mph, the entire
Talmage Road corridor can be scanned in less than
20 minutes.
− Accuracy/Precision: Scans 700,000 georeferenced
points/second at sub-centimeter accuracy within
the roadway corridor area and up to 2 centimeters
at a distance of 100 meters. Post-processing the
point cloud against survey control efficiently extracts all 3D topographic features. The camera captures
seamless photos simultaneously with the LiDAR scan
for a high definition photo reference. All surface
features are precisely mapped using this imagery.
− Extremely Cost-Effective: The cost for us to capture
and process the LiDAR data and deliver planimetric
surfaces for Talmage Road is only $8,000. Most of
this cost is in mobilization. With the supplemental
survey, the entire survey cost for the corridor is only Figure 5. Truck-mounted LiDAR Scan Equipment
Figure 6. LiDAR Scan Image
Equipment: LiDAR USA Snoopy A-Series/Velodyne
32E + Ladybug5 Camera
Accuracy: 2 cm @ 100m range
Scan Speed: 700,000 points/secondImaging Speed:
30MP @ 30 frames/second
GHD Clity of Ukiah Talmage Road Rehabilitation Project 10 about $23,400. Using traditional survey methods, it
would cost over $40,000 to survey Talmage Road and
develop mapping. We are also providing a proposal on
the Main Street Utilities Improvement project, and if
we were selected for both project, the cost to perform
the LiDAR surveys and deliver planimetric surfaces for
both projects would be only about $9,500.
Effective Project Management
Effective project management begins with effective
communication between the project manager and the
project team, as well as between the project manager
and City staff. Positive working relationships and effective project management are what lead to successful project
delivery. We place high value on our relationships with City staff and are proud of our track record of successful project delivery. GHD’s formal standardized and proven
project management procedures and protocols result in
effective management and execution of our projects.
GHD is committed to sustainable development, safety,
and innovation. GHD operates under the Practice
Quality Management System, ISO 9001:2015 and an
Environmental Management System, ISO 14001:2015, both
third-party certified. Our Project Manager, Erik Fanselau, will provide overall project management and maintain
effective communication with the City’s project staff
throughout the duration of the project.
Our Project Director, Matt Kennedy, our QA/QC Manager,
Pat Tortora, and our Project Manager, Erik Fanselau have all completed several road reconstruction/rehabilitation projects and pedestrian bridge projects, have an
excellent working relationship, are well-versed in the
City’s standards and procedures, and have a thorough
understanding of the existing conditions.
Financial Responsibility
Effective cost control begins with confirmation of the
total scope of work, establishing a realistic schedule for project implementation, and preparation of an accurate
and appropriate budget. Our draft baseline schedule for the project is included after the Scope of Work. All of the tasks are integrally linked with the scope of work tasks and budget and move forward in coordination as the project
progresses. The proposed schedule includes realistic time lines for all project tasks including meetings and milestone deliverables. Budgets are agreed to by all team members in advance, and tracked and managed as work progresses.
If selected for this project we will work with the City to confirm the baseline schedule to ensure each task deadline is met. The Project Manager, Matt Kennedy, will implement corrective actions, if needed, and ensure the budget is not exceeded, take responsibility if overages occur, and inform the City if unforeseen circumstances arise.
QA/QC Plan for the Project
GHD is guided by proven Practice Quality Management
System ISO 9001:2015 and an Environmental Management
System ISO14001:2015, as noted above. GHD has a
time tested and proven Project Quality Manual (PQM)
used for every project. The PQM describes the project
quality process that we follow during the development
of design documents, studies, reports, and other project deliverables. Pat Tortora will develop a Project Quality Plan (PQP) for this project, to be used by the design team.
The process starts when the project begins and ends with the completion of the final project approvals.
Design Quality Control (QC) reviews are managed by the
Quality Manager who, along with the Project Manager, are ultimately responsible for delivering quality work products to the City. Reviews are conducted to verify that project deliverables and supporting documents are complete
and understandable, conform to appropriate standards
and guidance, and meet GHD’s and City requirements and
expectations. The Quality Manager makes sure the team
adheres to the PQP, and that QA and QC review activities occur at the appropriate intervals. Quality management
activities include:
− Design reviews performed by exceptionally talented
staff who are independent of the design team and
committed to the highest levels of quality.
− Verifying the design team is checking work products
to confirm quality and documenting that prior review
comments have been addressed.
− Performing independent technical reviews of all
work products prior to submittal to the City or other
approving agencies.
Quality Control includes verifying one or more of the
following: basic design data and information, technical assumptions used in the design of the project, use of
proper formats, compliance with requirements, and
calculation methods and/or numerical accuracy. The PQP
includes seven standard steps:
1. Project Concept Review
2. Discipline Review
3. Graphics/CAD Standard Review
4. Project Manager Review
5. City Comment Review
6. Coordination Review Meeting
7. Design QA/QC Review
GHD Clity of Ukiah Talmage Road Rehabilitation Project 11 Design QC reviews performed at the discipline level
include peer checks of calculations and general overviews of technical assumptions.
Scope of Services
We are pleased to provide the City with our proposed
Scope of Services below for the Design of the Talmage
Road Rehabilitation Project.
Task 1 – Project Management
This task is for overall project management, subconsultant management, team coordination, progress meetings,
project administration, Health, Safety, and Environment (HSE) and Job Safety Environmental Analysis (JSEA)
health and safety, and related items. It also includes
budget and schedule tracking, project and contract
oversight, QA/QC, and project invoicing over an estimated nine month duration. GHD will provide effective project management throughout the design and environmental
permitting process so that quality documents are
prepared on time and within budget.
The following summarizes our project management
activities:
− Project coordination with the City and project
team. Coordination will include bi-weekly check‑in
calls and monthly design progress conference
meetings to communicate key project issues, which
may develop during design. GHD’s Project Manager will
also prepare a Project Work Plan, which communicates
the project scope, schedule, budget, and other
information to team members.
− Project Kickoff Meeting. GHD’s Project Manager
and Project Director will organize and attend a project kickoff meeting at the City’s Public Works Conference
Room, or online if preferred, to review the details
and requirements of the project. A key component
of the kickoff meeting is a design workshop where
the City and GHD can review key project elements
described in our Project Understanding and Project
Approach sections and confirm the City’s preferences.
The design workshop is an opportunity to discuss
design requirements, historical street and drainage
maintenance issues, long term maintenance goals,
materials, and appurtenances. We will also cover key
issues including, pavement rehabilitation options,
Doolin Creek crossings, bridge aesthetics, permitting
strategy, and other issues. Our goal with the workshop
is to have a clear path forward on the primary design
with options as necessary.
− Project progress. GHD's Project Manager will evaluate and track progress on scope, schedule, and budget;
and prepare monthly project activity reports to be
provided with each of our monthly invoices. These
reports will provide the City with a brief description of the activities completed during the previous month
and activities anticipated for the next month. At the
completion of project, Consultant/City evaluation
forms will be submitted upon City’s request for
performance review.
− Project Quality. The quality manager will develop
a PQP documenting the QA and QC process to be
followed for the project. This task includes periodic
design checks, QA/QC reviews, quality review
meetings, reviews of subconsultant deliverables, and
quality process documentation.
Task 1 Deliverables:
− Meeting agenda and associated meeting minutes
(electronic PDF)
− Monthly invoices and progress reports (electronic PDF) − Consultant/City evaluations (electronic PDF)
− PQP (electronic PDF)
Task 2 – LiDAR and Topographic Mapping
GHD will provide land surveying and right-of-way services.
Task 2.1 – LiDAR Scanning and Mapping
Following Notice to Proceed (NTP), GHD’s spatial sciences team will work directly with our project land surveyor to perform a LiDAR scan of the entire roadway corridor. This task involves setting/painting reflective survey markers at key locations along Talmage Road, which are digitally scanned during the LiDAR mapping process and used
to bring the LiDAR model into the real world horizontal coordinate system and vertical datum. The LiDAR scan
will be performed using a standard passenger vehicle
or pick‑up truck. The vehicle will drive at a speed of
10‑20 mph. For safety, a light bar and sign on the vehicle indicates a mobile scan is in progress, and the scanning can be done at night when traffic is minimal, if needed.
Following completion of the scan, the spatial sciences
team will post-process the LiDAR point data and develop the mapping. This process involves omitting unnecessary points, adding linework for edge of pavement, sidewalks, curbs and gutters, trees, signs, utilities, and other roadway features. The imagery collected with the scan can also
be used to map pavement condition issues which will be
identified for rehabilitation during design.
Task 2.2 – Supplemental Field Topographic Survey
Concurrent with the LiDAR mapping development, GHD
will establish local survey control based on nearby street
GHD Clity of Ukiah Talmage Road Rehabilitation Project 12 monuments and benchmarks. Topographic survey will be
provided on the North American Vertical Datum of 1988
(NAVD88), and the topographic map will horizontally relate to the California State Plane Coordinate System of 1983 (SPCS83), Zone II. After the reflective survey markers are placed for the LiDAR scanning, our surveyor will establish the project control network and set control points on the reflective survey markers, which will then be used to tie in the LiDAR mapping to the coordinate system.
Following survey control, a limited supplemental field
survey will be performed to verify elevations of sidewalk connections, tree species and sizes, key utility depths, and other important features. We will also obtain additional topographic data and cross-sections of Doolin Creek
where the LiDAR scanner may not reach to confirm we
have the channel bathymetry data needed for the bridge
and culvert hydraulic analysis and design.
The topographic survey will include the following:
− Complete survey of Talmage Road from Airport Park
Boulevard to South State Street
− The general width of the survey will be from
right‑of‑way (R/W) boundary to R/W boundary
including back of sidewalk and beyond R/W where
necessary to tie in improvements and address drainage
requirements. Mapping will extend a minimum of
five feet beyond the back of sidewalk or twenty feet
beyond the curb returns.
− For both the bridge crossing and culvert extension,
additional survey will be performed for the Doolin
Creek channel for the design as well as the hydraulic
analysis of the channel section.
− Existing public utilities and evidence of utility services, such as water meters and sewer cleanouts, will be
mapped if easily locatable outside the general width of the survey described above.
− Topographic survey will include all necessary work to produce a topographic map, including features such as,
but not limited to, building corners and elevations, curb and gutter lines, water meters, sewer cleanouts, valves, manholes (including rim, invert, and pipe information), utility markings on the pavement, utility poles, driveway and doorway locations, sidewalks, trees six (6) inches
and larger, retaining walls or decorative walls, and any other pertinent information that could apply to the
project during design.
Task 2.3 – Mapping Development
Following field survey, we will prepare the base
topographic mapping necessary for the design of the
project. All mapping will be prepared at a drawing scale of 1 inch = 20 feet with a one-foot contour interval, unless otherwise requested or required for design details.
Task 2 Deliverables
− Sealed hardcopy of Topographic Survey Map with the
project right of way (PDF).
− The AutoCAD Civil 3D file used to create the hardcopy will also be provided for your convenience (DWG).
Task 3 – Geotechnical Investigation
(Crawford and Associates)
A geotechnical investigation is included in the base scope of work for the structural foundation recommendations
for the pedestrian bridge and culvert extension for Doolin Creek. We have included an optional task at the end of the Scope of Services for recommended pavement cores and
testing of subgrade soils to confirm the existing pavement structural section and the design R-value for pavement
rehabilitation. The geotechnical investigation will be
performed by Crawford and Associates, Inc. (CAInc.)
Task 3.1 - Coordination and Preliminary Review
CAInc will coordinate with the design team and the City to discuss preliminary design plans, proposed boring
locations, project design needs, goals, and the schedule.
Following NTP, CAInc will:
− Obtain a City of Ukiah encroachment permit
− Visit the site to mark-out boring locations for USA
North 811
− Obtain a Count of Mendocino boring permit, if boring
depth requires
− Coordinate the drilling and traffic control
subcontractors
Task 3.2 - Subsurface Exploration
For the railcar bridge, CAInc proposed two borings, one on each bank, to provide data and recommendations for
the structural foundation design of the abutments, and for the subgrade preparation and design of the box culvert
extension.
The CAInc. Engineer/Geologist will direct the sampling
and log the borings, which will be sampled continuously in the upper 5 feet and at 5-foot intervals thereafter.
Standard Penetration Test and modified California
samples will be driven to obtain samples and blow count information. In addition, bulk samples will be collected in the upper 2 feet of subgrade. Traffic control will be implemented in accordance with the City encroachment
permit requirements.
GHD Clity of Ukiah Talmage Road Rehabilitation Project 13 Task 3.3 - Laboratory Testing
CAInc proposes to perform the following tests (as
appropriate) on representative soil samples obtained from the borings:
− Moisture Content and Unit Weight for soil classification and bearing capacity
− Unconfined Compression and/or Direct Shear for axial
and lateral bearing capacity
− Sieve Analysis and Plasticity Index for soil classification, bearing capacity, and liquefaction assessment
− Resistivity, pH, Sulfate Content, and Chloride Content for soil corrosivity analysis
Task 3.4 – Engineering Analysis and Report
CAInc will prepare a Geotechnical Report addressing the following elements:
− Project description, scope of work, site description
− Subsurface exploration
− Soil and groundwater conditions
− Field and laboratory testing
− Site geology and seismicity summary
− CBC seismic design parameters
− Corrosion evaluation
− Grading and construction recommendations, which
may include ground preparation, materials excavation,
placement, and compaction
− Rail car bridge and box culvert foundation
recommendations including scour considerations,
foundation recommendations (i.e. bearing capacity,
settlement, lateral resistance, and coefficient of friction to resist sliding, etc.)
− Construction considerations
− Location map, boring logs, and laboratory test results A Draft Geotechnical Report will be prepared for
submission with the 30% design submittal. Comments on
the Draft Geotechnical Report will be addressed and a
Final Geotechnical Report will be included with the 60% design submittal.
Task 3.5 – Consultation and Design Team Support
CAInc will provide consultations regarding geotechnical recommendations to the design team, as needed.
They will also provide a review of the project plans and specifications, provide comments and issue a letter stating the design is in general conformance with the geotechnical recommendations.
Task 3 Deliverables
− Draft Geotechnical Report (PDF)
− Final Geotechnical Report (PDF)
Task 4 – Preliminary Design (30%)
The preliminary design effort includes site visits, utility owner coordination, development of a BOD Technical
Memorandum, plans, and a construction estimate. This
submittal provides an early review of the project design and opportunity for key decisions and coordination.
Task 4.1 Site Visits and Information Review
GHD will conduct a detailed field visit of the project site following completion of the topographic mapping. The
purpose of the field visit is to review, refine and confirm the mapping; verify existing conditions; and identify
constructability issues. The project team will take
additional detailed notes and photos as needed for later use during project design.
Although this project does not involve any utility
improvements, identifying and mapping existing utilities is important to make sure potential conflicts with existing utilities are avoided with the design. The engineering team will also obtain and review existing utility mapping from the City, PG&E, AT&T, and Cablecom. Mapping may be
requested through the City to avoid costs charged by
these companies to private consultants. Utilities that were not identified during the field survey will be added to the base map. The effort will identify and resolve potential conflicts during Preliminary Design (Task 4). GHD will
update the base map with the new utility information
following each subtask for inclusion in the design.
Task 4.2 Doolin Creek Hydraulic Analysis
GHD's hydraulic engineering team will obtain the existing hydraulic model for Doolin Creek from FEMA and perform
a hydraulic analysis to determine the bridge and sidewalk elevations that will result in a "no-net-rise" in the FEMA regulated flood way. If the FEMA model is unavailable we will develop a duplicate effective model using the creek channel survey for the analysis. The expected design
will involve widening the creek channel and setting the sidewalk elevation to maintain the flood elevation in FEMA regulated flood way. A technical memorandum will be
prepared summarizing the analysis results demonstrating a no-net-rise. The hydraulic model will also be used to evaluate the design of the bridge and channel and develop
GHD Clity of Ukiah Talmage Road Rehabilitation Project 14 channel scour countermeasures in the vicinity of the
bridge.
Task 4.3 Prepare Basis of Design (BOD) Technical
Memorandum
The purpose of this task is to establish the design basis, confirm design criteria and capture the recommendations and City directions from the design workshop. GHD
will assess the design criteria and City’s requirements, including applicable standards, and summarize pavement
rehabilitation recommendations with planning level costs.
We will coordinate with geotextile suppliers and the
geotechnical engineer, as needed, to develop pavement
design solutions to achieve the City’s long-term goals as cost-effectively as possible. GHD will prepare a technical memorandum (TM) including the following:
− Bridge design and culvert extension: The new
pedestrian bridge and culvert extension geometry will
be discussed along with a summary of the hydraulic
analysis results and recommendations for designs.
This includes the proposed length for the bridge as it
relates to the channel crossing and abutment locations, and the design of the culvert extension including
its connection to the existing culvert, as well as
accommodating a sidewalk and hand railings.
− Pavement rehabilitation options: GHD will summarize
pavement rehabilitation and reconstruction options
with planning level costs for comparison purposes.
− Staging area(s): During the site walk, GHD will discuss potential contractor staging areas with the City.
Potential staging areas can be noted and/or described
in the contract documents.
− Construction traffic management: Traffic control
plans will be provided by the Contractor, and
requirements may include advanced warning devices,
signage, notifications, work time restrictions, and
needed personnel (i.e., flaggers). These requirements
will be included in the specifications in later submittals. − Construction schedule: GHD will review the likely
sequence of construction activities, with assumptions
for nighttime construction of work, limited hours
working in highly trafficked areas, and potential for
multiple work crews in order to estimate the number of
construction working days. The estimated number of
working days will be refined during development of the
subsequent submittals.
The BOD TM will be included with the 30% submittal for
City comments. The TM will be revised and finalized and included with the 60% submittal.
Task 4.4 Prepare 30% Plans and Construction Estimate
Plans will be based on surveyed information and mapping developed in Task 2, as well as the draft geotechnical
recommendations developed in Task 3, and will depict the proposed alignments, typical cross sections, layouts of sidewalks and curb ramps, preliminary bridge and culvert designs, and other improvements. Geotechnical boring
locations and boring logs will be included with the plans.
Preliminary demolition and pavement improvements will
also be depicted. Profiles of the existing ground surface along the alignment will be included. Plans will be based on surveyed information provided obtained under Task 2, and prepared at a scale of 1 inch=20 feet on 22" x 34" sheets using the GHD standard title block.
The opinion of probable construction cost will be
Association for the Advancement of Cost Engineering
(AACE) International Recommended Practice 56R-08
estimate class 4/3 and organized in a bid schedule format with unit prices based on previous bid results for prevailing wage projects and similar work. Specialty construction
will be evaluated on labor, materials and equipment.
Contractor overhead and profit, markups and estimates of soft costs will be included. Escalation to estimated time of construction will be included.
The 30% design will be submitted to the City, and following City review, we will attend a design review meeting to
discuss City comments and request approval to proceed
with the 60% design.
Task 4 Deliverables:
− Doolin Creek Hydraulic Analysis Technical
Memorandum (electronic PDF)
− Draft Basis of Design Technical Memorandum
(electronic PDF)
− 30% Full-size (22”x34”) Drawings (electronic PDF)
− Opinion of Probable Construction Cost (electronic PDF) Task 5 – Intermediate Design (60%)
Following the preliminary design (30%) review meeting,
GHD will prepare 60% PS&E using the project information prepared and addressing 30% design comments. The
60% design will depict the final alignment, recommended profile, cross sections, and details.
Task 5.1 Prepare 60% PS&E
Plans will be updated to address City comments on the
30% design, incorporate utility mapping not previously
received, and will depict the proposed road alignment and profile. The plans will show geotechnical boring locations, bridge and culvert layouts, mitigation requirements,
GHD Clity of Ukiah Talmage Road Rehabilitation Project 15 such as trees or debris removal, sidewalks, driveway
and curb ramp details, and other design details as well as applicable City Standard details. Typical sections will be further developed, and details for pavement repairs, edge and conform grinds and overlays will be included.
Cross sections will be developed every 50 feet and at
key locations, including cross sections and details for the pedestrian bridge and culvert extension. Proposed
temporary construction easements (TCEs) and contractor
laydown areas can be shown where confirmed with the
City and where R/W provides.
Complete technical specifications will be provided based on the City’s boilerplate, which we have used and updated for previous projects. Specification sections will reference current Caltrans Standard Specifications. General
requirements will be coordinated with the City’s front-end contract, where needed.
The opinion of probable construction cost will be updated to AACE International Recommended Practice 56R-08
estimate class 3/2 with an updated unit price analysis
(UPA). We will also adjust costs based on discussions with vendors and contractors. Specialty construction will be further evaluated on labor, materials, and equipment.
The BOD Report will be updated and finalized to address City comments and reflect any changes in the design
that were not part of the preliminary design, such as
final hydraulic analysis results to confirm bridge, culvert and channel hydraulic requirements and improvements.
Calculations supporting the design will be included with the updated BOD Report.
The 60% design will be submitted to the City and following City review, we will attend a design review meeting to
discuss City comments and request approval to proceed
with the 90% design.
Task 5 Deliverables:
− Final Basis of Design Technical Memorandum
(electronic PDF)
− 60% Full-size (22”x34”) Drawings (electronic PDF and
DWG)
− 60% Technical Specifications (electronic PDF and
DOCX)
− Opinion of Probable Construction Cost (electronic PDF) Task 6 – Detailed Design
Following the 60% design review meeting GHD will prepare 90% (Pre-Final) PS&E. The 90% submittal will be essentially complete pending any final revisions to the design and
details and any final City comments. The 100% (Final)
submittal will be bid-ready.
Task 6.1 Prepare Pre-Final (90%) PS&E
Plans will be updated to address City comments on the
60% design and will depict the final road alignment, profile, cross sections, typical sections, and details. The structural design and details for the pedestrian bridge and culvert extension will be updated. Proposed contractor laydown
areas can be shown where needed.
Technical specifications will be updated using
tracked‑change edits to identify changes from the 60%
submittal. We will incorporate all qualitative requirements, material requirements, requirements for traffic control, WPCP, and other requirements for construction. General
requirements will be coordinated with the City’s front-end contract, where needed, and flagged for City approval. A bid schedule and pay item descriptions will also be included to align all bid items with detailed payment item descriptions.
The opinion of probable construction cost will be
updated to AACE International Recommended Practice
56R-08 estimate class 2/1. We will also make any final
adjustments to unit costs based on discussions with
vendors and contractors.
Structural calculations supporting the design of the
pedestrian bridge and culvert extension will be included with the deliverable.
The 90% design will be submitted to the City and following City review, we will attend a design review meeting to
discuss City comments and request approval to proceed
with the Final (100%) design.
Task 6.1 Deliverables:
− Final Structural Calculations (electronic PDF)
− 90% Full-size (22”x34”) Drawings (electronic PDF and
DWG)
− 90% Technical Specifications (electronic PDF and
DOCX)
− Opinion of Probable Construction Cost (electronic PDF) Task 6.2 Prepare Final (100%) PS&E
GHD will prepare complete set of biddable plans and
technical specifications and final opinion of probable
construction costs. Plans, specifications, bid schedule and estimate with final quantities will be finalized based on City comments on the 90% submittal. The recommended number
of working days will also be provided. A submittal register summarizing all contractor submittals will also be provided to assist the City’s construction manager and inspectors.
GHD Clity of Ukiah Talmage Road Rehabilitation Project 16 Task 6.2 Deliverables:
− 100% Full-size (22”x34”) Drawings (electronic PDF and DWG)
− 100% Technical Specifications (electronic PDF and
DOCX)
− Opinion of Probable Construction Cost (electronic PDF) Task 7 – Prepare Permit Applications and
Coordinate with Agencies
GHD will prepare and submit the permit application
packages for an Army Corps Nationwide Section 10/404
Permit, a RWQCB Section 401 Water Quality Certification, and a CDFW Streambed Alteration Agreement. In support
of the application packages, GHD will prepare a Biological Resource Evaluation and Aquatic Resource Mapping for
the project site. Environmental staff will coordinate with the engineers to assist in providing recommendations
for avoiding impacts and identifying minimization and
mitigation measures where avoidance cannot be achieved.
However, it is anticipated that some level of on-site
mitigation will be required.
This task also includes one site visit with the resource agencies and up to 40 hours of follow-up coordination
after the applications have been submitted.
Task 7 Deliverables:
− Army Corps permit application package
• Aquatic Resources Mapping
• Biological Resources Technical Memorandum
• Conceptual on-site Mitigation Plan
− RWQCB permit application package
− CDFW permit application package
Optional Services
Task 8 Geotechnical Pavement Investigation and
Recommendations
As an optional task, GHD’s geotechnical engineering
subconsultant CAInc will perform the following additional services to confirm the existing pavement section
thickness and composition and determine the R-value of
the subgrade soils for the purpose of providing pavement rehabilitation recommendations that more accurately
reflect the existing pavement conditions.
Task 8.1 – Subsurface Exploration
For pavement design recommendations, CAInc proposes
four shallow borings/cores within Talmage Road at
locations to be determined in coordination with the
City and GHD. Cores would extend up to 5-feet below
ground surface. The CAInc Engineer/Geologist will direct the sampling and log the borings, which will be sampled continuously in the upper 5 feet. Bulk samples will be
collected in the upper 2 feet of subgrade. Traffic control will be implemented as described in Task 3.
Task 8.2 – Laboratory Testing
CAInc will determine the R-value for the subgrade and
provide a recommended R-value or range for design. Soils will also be tested for:
− Moisture Content and Unit Weight for soil classification and bearing capacity
− Sieve Analysis and Plasticity Index for soil classification, bearing capacity, and liquefaction assessment
Task 8.3 – Engineering Analysis and Report
CAInc will incorporate the results of the laboratory testing into the Geotechnical Report deliverable in Task 3.
Task 9 Prepare SWPPP
As an optional task, if it is determined during design that the project will disturb 1.0 acre of area or more, GHD
will request authorization to prepare a SWPPP for the
project to obtain coverage under the General Permit for Discharges of Storm Water Associated with Construction
Activities. This task also includes submitting the SWPPP and filing the Notice of Intent (NOI) online with the
NCRWQCB. The SWPPP will be prepared by a QSP/QSD in
accordance with State Water Board requirements.
Task 9 Deliverables:
− SWPPP (electronic PDF and native files)
City Provided Information
− Available reports, studies, investigations, as-built
plans, record drawings, maps, agreements, and other
available information for projects constructed within
the R/W
− Access to City facilities, R/W, property, and other
areas needed to survey and gather information in
support of the project
− Front-end boilerplate contract and technical
specifications
GHD Clity of Ukiah Talmage Road Rehabilitation Project 17 − Results of previous City bids for similar projects
− Consolidated design review comments
Use of Documents Provided by Others
The scope of services provided above relies on
information to be provided by the City and others’
information that will be useful for project. GHD will utilize information that is provided by the City or otherwise
obtained through field work. This information will be
assumed to be accurate. If data conflicts are found, GHD may recommend that the City obtain further information
to verify the data.
Exceptions and Exclusions
As requested in the RFP, exceptions and exclusions have been included in Section 6 on page 47.
GHD Clity of Ukiah Talmage Road Rehabilitation Project 18 Detailed Project Schedule
We have developed this detailed schedule to reflect our plan to complete the project design at least 1 month ahead of the City's RFP schedule. This schedule assumes 3 weeks for City reviews of design deliverables, and leaves 1 month of float time to address issues which may arise or provide additional time as needed. If selected, we will refine the schedule with City input to meet your needs and expectations for the delivery of this project.
ID Task Name Duration Start Finish
1 City Council Award Consultant Contract 0 days Wed 2/16/22Wed 2/16/22 2 Signed Contract / Notice to Proceed 0 days Thu 2/17/22 Thu 2/17/22 3 Task 1 - Project Management 144 days Fri 2/18/22 Wed 9/7/22 4 1.1 Project Initation 5 days Fri 2/18/22 Thu 2/24/22
5 1.2 Project Coordination 144 days Fri 2/18/22 Wed 9/7/22 6 Monthly Progress Meetings 136 days Wed 3/2/22 Wed 9/7/22 14 1.3 Kick-off Meeting & Workshop 1 day Wed 2/23/22Wed 2/23/22 15 1.4 Design Quality Management 5 days Fri 2/18/22 Thu 2/24/22 16 Task 2 - Topographic Survey & Mapping 15 days Fri 2/25/22 Thu 3/17/22 17 1.1 LiDAR Scanning and Mapping 5 days Fri 2/25/22 Thu 3/3/22 18 1.2 Supplemental Field Survey 10 days Fri 2/25/22 Thu 3/10/22 19 1.3 Mapping Development 10 days Fri 3/4/22 Thu 3/17/22 20 Task 3 - Geotechnical Investigation 137 days Fri 2/25/22 Mon 9/5/22 21 3.1 Coordination and Preliminary Review 10 days Fri 2/25/22 Thu 3/10/22 22 3.2 Subsurface Exploration 5 days Fri 3/11/22 Thu 3/17/22 23 3.3 Laboratory Testing 10 days Fri 3/18/22 Thu 3/31/22 24 3.4 Engineering Analysis and Report 10 days Fri 4/1/22 Thu 4/14/22 25 3.5 Consultation and Design Team Support 112 days Fri 4/1/22 Mon 9/5/22 26 Task 4 - Preliminary Design (30%) 53 days Thu 2/24/22 Mon 5/9/22 27 4.1 Site Visits and Information Review 37 days Thu 2/24/22 Fri 4/15/22 28 4.2 Doolin Creek Hydraulic Analysis 21 days Fri 3/18/22 Fri 4/15/22 29 4.3 Basis of Design Tech Memo 37 days Thu 2/24/22 Fri 4/15/22 30 4.4 30% Plans and Estimate 21 days Fri 3/18/22 Fri 4/15/22 31 QC Review & Submit to City 5 days Mon 4/11/22Fri 4/15/22 32 City Review 30% Design 15 days Mon 4/18/22Fri 5/6/22 33 30% Design Review Meeting 1 day Mon 5/9/22 Mon 5/9/22 34 Task 5 - Intermediate Design (60%) 41 days Tue 5/10/22 Tue 7/5/22 35 5.1 60% PS&E 25 days Tue 5/10/22 Mon 6/13/22
36 QC Review & Submit to City 5 days Tue 6/7/22 Mon 6/13/22 37 City Review 60% Design 15 days Tue 6/14/22 Mon 7/4/22 38 60% Design Review Meeting 1 day Tue 7/5/22 Tue 7/5/22 39 Task 6 - Detailed Design (90% and 100%) 46 days Wed 7/6/22 Wed 9/7/22 40 6.1 Pre-Final (90%) PS&E 20 days Wed 7/6/22 Tue 8/2/22 41 QC Review & Submit to City 5 days Wed 7/27/22Tue 8/2/22 42 City Review 90% Design 15 days Wed 8/3/22 Tue 8/23/22 43 90% Design Review Meeting 1 day Wed 8/24/22Wed 8/24/22 44 6.2 Final (100%) PS&E 10 days Thu 8/25/22 Wed 9/7/22 45 QC Review & Submit to City 3 days Mon 9/5/22 Wed 9/7/22 46 Task 7 - Resource Agency Permitting 22 days Wed 7/6/22 Thu 8/4/22 47 7.1 Prepare Permit Applications 20 days Wed 7/6/22 Tue 8/2/22 48 7.2 Agency Coordination 2 days Wed 8/3/22 Thu 8/4/22 49 Task 8 - Geotect Pavement Investigation (Optional) 35 days Fri 2/25/22 Thu 4/14/22 50 8.1 Coordination and Preliminary Review 10 days Fri 2/25/22 Thu 3/10/22 51 8.2 Subsurface Exploration 5 days Fri 3/11/22 Thu 3/17/22 52 8.3 Laboratory Testing 10 days Fri 3/18/22 Thu 3/31/22 53 8.4 Engineering Analysis and Report 10 days Fri 4/1/22 Thu 4/14/22 54 Task 9 - Prepare SWPPP (Optional) 22 days Wed 7/6/22 Thu 8/4/22 55 9.1 Develop SWPPP 20 days Wed 7/6/22 Tue 8/2/22
56 9.2 Submit SWPPP and File NOI 2 days Wed 8/3/22 Thu 8/4/22 2/16
2/17
1.1 Project Initation
1.2 Project Coordination
1.3 Kick-off Meeting & Workshop
1.4 Design Quality Management
1.1 LiDAR Scanning and Mapping
1.2 Supplemental Field Survey
1.3 Mapping Development
3.1 Coordination and Preliminary Review
3.2 Subsurface Exploration
3.3 Laboratory Testing
3.4 Engineering Analysis and Report
3.5 Consultation and Design Team Support
4.1 Site Visits and Information Review
4.2 Doolin Creek Hydraulic Analysis
4.3 Basis of Design Tech Memo
4.4 30% Plans and Estimate
QC Review & Submit to City
City Review 30% Design
30% Design Review Meeting
5.1 60% PS&E
QC Review & Submit to City
City Review 60% Design
60% Design Review Meeting
6.1 Pre-Final (90%) PS&E
QC Review & Submit to City
City Review 90% Design
90% Design Review Meeting
6.2 Final (100%) PS&E
QC Review & Submit to City
7.1 Prepare Permit Applications
7.2 Agency Coordination
8.1 Coordination and Preliminary Review
8.2 Subsurface Exploration
8.3 Laboratory Testing
8.4 Engineering Analysis and Report
9.1 Develop SWPPP
9.2 Submit SWPPP and File NOI
January February March April May June July August September October November December City of Ukiah Talmage Road Rehabilitation Project Baseline Schedule GHD Inc. January 31, 2022
GHD Clity of Ukiah Talmage Road Rehabilitation Project vii → Project Team
03
GHD Clity of Ukiah Talmage Road Rehabilitation Project 19
3. Project Team
Firm Qualifications
GHD provides transportation planning and engineering,
environmental, advisory, digital, and construction services to private and public sector clients. Operating globally and delivering services locally, we are able to offer clients the ability to develop a working relationship with our local staff while having access to our global experience base.
Put simply, we work where our clients work.
Firm Information
Established in 1928, GHD is wholly-owned by our people.
We are a global professional services company that leads through engineering, construction and architectural
expertise. Our forward-looking and innovative approaches connect and sustain communities around the world.
Delivering extraordinary social and economic outcomes,
we are focused on building lasting relationships with our partners and clients. We have been providing professional engineering services in California since 1949.
Our people offer decades of knowledge, as well as a
deep understanding of the challenges facing businesses
and communities today. We deliver projects with high
standards of safety, quality, and ethics across the entire asset value chain. Driven by a client service-led culture, we connect the knowledge, skill, and experience of our
people with innovative practices, technical capabilities, and robust systems to create lasting community benefits.
Civil Engineering Services
GHD has an excellent performance record with municipal
and government agencies throughout California. We
are proud of our decades of service to the City of Ukiah delivering award-winning projects. We look forward
to working with the City again on the Talmage Road
Rehabilitation Project.
Many of GHD’s past and current projects for the City of Ukiah include the following services:
− Civil Engineering
− Complete Streets/Streetscape Design
− Motorized and Non-Motorized Transportation
− Utilities Rehabilitation/Replacement
− Traffic Planning and Engineering
− Planning/Design
− Landscape Architecture/Wayfinding
− Hydrogeology
− Construction Administration
− Construction Management and Inspection
− Land/Construction Surveying
− Public Outreach and Interagency Coordination
About GHD
Address
2235 Mercury Way, Suite 150
Santa Rosa, CA 95407
Contact
Erik Fanselau, PE, CFM, LEED AP
+1 916 256 2677 | [email protected]
Year Established
1949 in California
Organization Type
California Corporation
Why GHD?
Strong Leadership
− Project Director, Matt Kennedy has successfully
delivered numerous City of Ukiah projects and has
extensive experience directing multi-disciplinary
teams.
− Project Manager, Erik Fanselau has 23+ years of
managing roadway replacement and rehabilitation
projects.
− Quality Control/Quality Assurance Manager, Pat
Tortora, successfully delivered the Great Redwood
Trail Phases 2 and 3.
City of Ukiah Experience
− Many of our team members have worked on City
of Ukiah projects including Maya Eoff, Jeremy
Svehla, Steve Burns, Kristine Gaspar, and our
subconsultant, Crawford & Associates, Inc.
GHD Clity of Ukiah Talmage Road Rehabilitation Project 20 Committed to You
GHD is dedicated to understanding and helping the
City achieve its goals. We are committed to sustainable development, safety, and innovation. We care for the
well-being of our people, assist communities in need,
and conduct business in an ethical and environmentally
responsible manner. We can also offer our clients the
confidence and peace of mind that comes from the
fact that GHD was ranked 19th in the Top International
Design Firms by Engineering News-Record in 2021.
Financial Responsibililty
Together with its affiliate companies, GHD currently
employs approximately 2,500 employees across 75
offices in the United States, and has more than 10,000
employees globally. GHD’s global gross revenues
exceeded $1.7 billion USD in 2021. GHD’s current assets in the United States exceed $361 million USD. GHD uses
a fully functional commercially available accounting
system that is integrated with the general ledger and is used to manage project budgets, prepare invoices to
clients, accumulate project costs, and generate any
required supporting documentation to clients. All of GHD’s project managers are trained on the use of the accounting system for the purpose of responsibly managing project
budgets. The accounting system is also used to document and manage all financial activities of GHD. Each year
GHD Inc. undergoes an independent financial audit of
the company’s indirect expenses, direct labor costs and overhead costs in accordance with auditing standards
generally accepted in the United States and the standards applicable to financial audits contained in Government
Auditing Standards issued by the Comptroller General of the United States. The audit confirms GHD’s compliance
with applicable provisions of laws, regulations and
contracts, including provisions of the applicable sections of Part 31 of the Federal Acquisition Regulations (FAR), documentation of which is required to perform work
under U.S. federal contracts. Through these accounting
systems and audits GHD maintains a high level of ethical and financial responsibility on all contracts it provides professional services through to clients.
Our Subconsultant
Crawford & Associates, Inc.
40+
years
in
business
CAInc is a registered Small Business
Geotechnical Engineering firm
(Certification ID: 1744908) that specializes
in large-scale public works projects. In
2016, CAInc merged with Taber
Consultants, one of the nation’s oldest
geotechnical engineering companies. The principals of
both firms bring significant geotechnical engineering
experience on a wide variety of projects throughout
Northern California. CAInc has provided geotechnical
engineering services on hundreds of projects, including roadways, trails, water and wastewater plants, water tanks, pipelines, sewer, wells, stormwater, fish passage, dams, and levees. Their staff has experience working with various state and federal agencies, including USACE, California Departmetn of Fish and Wildlife, RWQCB, Division of
Safety of Dams, National Marine Fisheries Service, and US Fish & Wildlife Services.
CAInc and Taber have provided geotechnical services for nearby projects, including:
− City of Ukiah Great Redwood Trail,
Phases 2, 3 and 4
− City of Ukiah Downtown Streetscape,
Phase 2
− City of Ukiah Redwood Business Park
− City of Ukiah Courthouse Project
− City of Ukiah Hydroelectric Plant
− City of Ukiah Chloride Contact Basin
Replacement
− City of Ukiah Country Manor Mobile
Home Park
− City of Ukiah High School SWPPP NOT
− City of Ukiah Kohl’s Expansion
− City of Ukiah Lake or Streambed
Alteration for Three Creeks
"In a rapidly changing
world, we are committed
to our vision of water,
energy and urbanization
made sustainable for
generations to come."
Ashley Wright, CEO
GHD Clity of Ukiah Talmage Road Rehabilitation Project 21 − City of Ukiah Recycled Water Project
− City of Ukiah Water Pipeline, Mendocino County
− City of Ukiah WTP Basin Rehabilitation Project
− Electrical Substation at East Gobbi Street & South
Orchard Avenue
− Gobbi Well Project, Ukiah
− Industrial Stormwater Monitoring Services – Gobbi
Street
− Metering Structure on Babcock Lane South of Gobbi
Street
The firm has access to reports, log of test borings, and soils information for these projects.
For the past 20 and more years, Principals at Crawford
have specialized in pavement rehabilitation projects
and have stayed involved in the development and
implementation of alternative pavement rehabilitation
strategies. Advancement in pavement emulsions and
the desire to recycle more pavement have led to seismic shifts in the pavement rehabilitation industry. When CAInc approaches a pavement project, staff combine their soils engineering knowledge with their pavement experience
to develop a solution that meets more than just the
desire traffic index for the project. They typically provide five to six rehabilitation options for each project to help clients better understand the schedule, cost, noise, and expected design life implications. This approach allows clients to make decisions that better suit the project
needs. Following field work and as-built review, CAInc
typically provides recommendations for a combination of the following rehabilitation techniques:
− Traditional Mill and Overlay
− New pavement section recommendations (including
deep lift HMA)
− Cold In-Place HMA recycling
− Cold Central Plant HMA recycling
− FDR
− Cold Foam Recycling
− Lime and Cement Treatments
− Slurry and/or other seals
− Roller Compacted Concrete and other concrete options
For the Talmage Road Rehabilitation Project,Ryan
Houghton from CAInc's Ukiah Office will serve as Project Manager and Chris Trumbull from the Sacramento Office
will serve as Senior Project Manager.
Contact:
Ryan Houghton, PE, Project Manager
100 North Pine Street, Ukiah, CA 95482
D: +1 707 240 4400
[email protected]
Figure 7. Ukiah Great Redwood Trail Pedestrian Bridge
GHD Clity of Ukiah Talmage Road Rehabilitation Project 22 Civil/Roadway/Drainage Engineering
Maya Eoff, PE 🔑
Hugo Orozco, EIT 🔑
Ashley Hoy, EIT
LiDAR and Topographic Surveying
Richard Maddock, PLS 🔑
John Hanser, PLS
Harrison Hummel 🔑
Hydraulic Engineering
Jeremy Svehla, PE🔑
Structural Engineering
Steve Burns, SE, ME🔑
Resource Agency Permitting
Kristine Gaspar🔑
GHD Team Structure and Members
We have assembled a team with the requisite skills and
availability to complete this project with the excellent quality and customer service the City has come to expect from GHD. Many of our proposed team members have
worked on previous City projects and will be familiar
to you. We are committed to delivering this project in a timely fashion, with flexibility and responsiveness. The organizational chart below details our proposed staff,
including disciplinary-based roles tailored to your project.
Additional staff may be called upon if needed.
Resumes
In this section, we have highlighted the qualifications of our key personnel. We have also provided full, detailed resumes for all staff on our organizational chart in the Appendix.
19 Years
Team members' average
number of years of experience
🔑 Key Personnel
CERTIFICATIONS AND REGISTRATIONS LEGEND
EIT: Engineer in Training
ENV SP: Envision Sustainability Professional
GE: Geotechnical Engineer
LEED AP: LEED Accredited Professional
ME: Mechanical Engineer
PE: Professional Engineer
PLS: Professional Land Surveyor
QSD: Qualified SWPPP Developer
QSP: Qualified SWPPP Practitioner
SE: Structural Engineer
TE: Traffic Engineer
Matt Kennedy, PE, TE, ENV SP 🔑
Project Director
Erik Fanselau, PE, CFM, LEED AP 🔑
Project Manager
Pat Tortora, PE 🔑
Quality Assurance/
Quality Control
Geotechnical Pavement Engineering (Optional)
Crawford & Associates
Chris Trumbull, PE, GE
Figure 6. Organizational Chart
City Project Manager
Andrew Stricklin
GHD Clity of Ukiah Talmage Road Rehabilitation Project 23 Key Team Member Introductions
Key Personnel Qualifications
BS, Civil Engineering,
Civil Engineer: CA
#64814, CO #40007
Certified Floodplain
Manager: #US-11-
06045
LEED AP, #10591588
Erik Fanselau, PE, CFM, LEED AP | Project Manager
Man Hours Committed to the Project: 116
Responsibilities: As Project Manager, Erik Fanselau will be the primary point-of-contact for the City.
He will be responsible for coordinating the team’s efforts and maintaining adherence to the project schedule, scope, and budget.
Erik has over 23 years of civil engineering experience including design, project management, construction management, and utility coordination. His expertise includes drainage, hydrology and hydraulics, water quality design, roadway design, utility coordination, pipeline rehabilitation, pump station design, and erosion control plans.
Relevant Project Experience
– County Road 31 Improvements | Davis, CA
– C-470 Improvements (Design/Build) | Highlands Ranch, CO – Doyle Drive (Highway 101) | San Francisco, CA
MS, Environmental
Engineering
BS, Environmental
Resources Engineering
Civil Engineer
CA #68304, OR
#83450PE, NV #24172,
NM #23032, CNMI
#528, GU #1337, HI
#18171
Traffic Engineer
CA #2385
–USACE/NAVFAC
Certified Construction
Quality Manager
– Caltrans Certified
Resident Engineer
Matt Kennedy, PE, TE, ENV SP | Project Director
Man Hours Committed to the Project: 15
Responsibilities: Matt will be the Project Director (Principal-in-Charge) who will oversee all project deliverables, as well as utilizing his local knowledge and experience to ensure a timely and quality product.
Matt is a licensed civil and traffic engineer with 19 years of experience in traffic/transportation, utility systems and sustainable civil engineering. He is adept in the design and management of a broad range of civil infrastructure projects, including roadways, storm drainage and LID, traffic signals, pedestrian and bicycle facilities, striping and signing, retaining walls, water and wastewater conveyance systems, civil site design, and traffic control. His experience also includes a broad range of planning, modeling and analysis capabilities including utility master planning, hydrologic and hydraulic modeling, water and wastewater process design, traffic and parking studies, circulation studies, and analysis and timing of signals. He is also experienced in land surveying and construction management.
Relevant Project Experience
– Ukiah Streetscape, Road Diet and Utilities Project, Phases 1 & 2 | Ukiah, CA – Redwood Business Park Transportation Improvements | Ukiah, CA – Various Streets Overlay Project | Rohnert Park, CA
– Arlen Drive and East Cotati Avenue Overlays Project | Rohnert Park, CA
GHD Clity of Ukiah Talmage Road Rehabilitation Project 24 Key Personnel Qualifications
BS, Civil Engineering
Civil Engineer:
CA #80067, OR, WA, ID,
GU, LEED AP
Pat Tortora, PE | Quality Manager
Man Hours Committed to the Project: 12
Responsibilities: Pat Tortora will be responsible for quality assurance and quality control.
Pat brings 25 years of experience in providing planning, design, and construction engineering solutions to public and private clients, with an emphasis on civil design in collaboration with multi-disciplinary teams for comprehensive civil and transportation infrastructure projects. Pat has served as Civil Engineering Lead and Project Manager on five recent City of Ukiah projects and has performed key oversight and civil engineering design on roadway, streetscape, trail, pathway, and/or safe routes projects for other local agencies such as the City of Fort Bragg, the City of Rohnert Park, and Sonoma Marin Area Rail Transit (SMART).
Relevant Project Experience
– Ukiah Streetscape, Road Diet and Utilities Project, Phases 1 & 2 | Ukiah, CA – Ukiah Rail-Trail Phases 1, 2, and 3 | Ukiah, CA
– Main Street/SR-1 Realignment | Fort Bragg, CA
– Downtown Revitalization | Independence, OR
MS, Civil and
Environmental
Engineering
BS Chemical
Engineering
Civil Engineer: CA
#90635
Maya Eoff, PE | Civil/Roadway/Drainage Engineering
Man Hours Committed to the Project: 125
Responsibilities: Maya Eoff will provide the necessary expertise and lead the design for the civil and roadway engineering for the project.
With over 10 years of experience, Maya has worked as a project engineer on a variety of projects including transportation, mining, wastewater design, and water quality modeling. She has assisted with the design of several roadway projects in California, including the recent Ukiah Downtown Streetscape Phase 2 and the Airport Boulevard Rehabilitation for the County of Napa. In addition to her technical skills, she also brings flexibility that she developed while working on complex and dynamic projects, which makes her a reliable teammate. She enjoys learning new skills and pursues excellence in every project.
Relevant Project Experience
– Ukiah Downtown Streetscape, Phase 2 | Ukiah, CA
– Airport Boulevard Rehabilitation | American Canyon, CA – Artesia Great Boulevard Improvement | Long Beach, CA
BS, Civil Engineering
Engineer in Training: CA
#164509
Hugo Orozco, EIT | Civil/Roadway/Drainage Engineering
Man Hours Committed to the Project: 172
Responsibilities: Hugo Orozco will assist Maya with the design for the civil and roadway engineering aspects of the project.
Hugo is proficient in AutoCAD Civil 3D and he has participated in site civil development projects by preparing plans for grading and drainage, road design, roadway repairs, roundabouts, street rehabilitation, ADA compliance, erosion and sediment control, detention ponds, stormwater control, and utility layout. His strong work ethic, positive attitude, and team-oriented approach contribute to solving complex problems.
Relevant Project Experience
– Town of Paradise Off-System (Roadway) Rehabilitation | Paradise, CA – Downtown Cotati Civic Center Connectivity and Safety Project | Cotati, CA – Windsor River Road/Windsor Road Roundabout and Multi-Use Path Connector Project | Windsor, CA
GHD Clity of Ukiah Talmage Road Rehabilitation Project 25 Key Personnel Qualifications
General Courses, Land
Surveying and Business
Management
Professional Land
Surveyor: CA #8131
Richard Maddock, PLS | LiDAR and Topographic Surveying
Man Hours Committed to the Project: 8
Responsibilities: Richard Maddock will lead and coordinate the survey tasks for this project.
Richard is a California-registered professional land surveyor. He has over 30 years of experience in all aspects of land surveying. He is an experienced party chief working on projects varying from roadways and utilities to subdivisions. With the budget and timeline in mind, Richard delivers a superior product for the client. In the field, he will be the Party Chief of the primary survey crew. Being the Party Chief will provide him with first-hand knowledge of the site, the condition of the existing monuments, and other important information critical to producing an accurate survey performance area.
Relevant Project Experience
– Stony Point Road Reconstruction and Widening, Phase 2 | Santa Rosa, CA – Millbrae Avenue Box Culvert Repair | Millbrae, CA
– Napa Road Rehabilitation Project (STPL-5114(017)) | Sonoma, CA GIS Certificate Program
Course, Part 107 Pilot
Harrison Hummel | LiDAR and Topographic Surveying
Man Hours Committed to the Project: 24
Responsibilities: Harrison Hummel will lead the LiDAR scanning efforts for this project.
Harrison has extensive experience following industry standards and best practices for collection, management, and analysis of GIS spatial data. He can create meaningful and accurate maps and reports that enable clients to visually interpret complex spatial questions for a wide variety of different projects.
As a Part 107 UAV Pilot, he carries a primary focus on producing survey grade deliverables and botanical mapping products that can aid in mitigation planning and monitoring. Harrison strives to provide simple solutions for complex problems by utilizing advanced geospatial technologies.
Relevant Project Experience
– Guam Routes 1 and 3 Under Pavement Infrastructure Retrofit - Mobile LiDAR Scan | Guam – Tehama County Highway 99 Mobile/UAV LiDAR Scan | Tehama County, CA – Mendocino Roadway Mobile LiDAR Scan | Mendocino, CA
BS, Environmental
Resources Engineering
Civil Engineer: CA
#72169
Qualified Stormwater
Pollution Prevention
Plan Developer/
Practitioner #00159
Jeremy Svehla, PE, QSD/QSP | Hydaulic Engineering
Man Hours Committed to the Project: 64
Responsibilities: Jeremy Svehla will lead the Doolin Creek hydraulic analysis for the project, as well as any in-channel designs needed.
Jeremy is a professional engineer with over 17 years of experience in water resources and coastal engineering, encompassing a broad range of engineering design, project management, and construction management for large-scale wetland improvements, stream habitat restoration, and flood control projects. He has served as project manager or project engineer for a variety of projects from transportation to restoration and habitat improvement/enhancement projects for the majority of our team’s high-profile restoration projects, including for CalTrout, the Wildlands Conservancy, California Water Service Company, Alameda County Water District, Santa Clara Valley Transportation Agency, the Five Counties Salmonid Conservation Program, and the City of Fortuna. As a testament to the quality of his service, Jeremy was named the ASCE San Francisco Section North Coast Branch “Engineer of the Year” in 2015.
Relevant Project Experience
– Gobbi Street Intersection Bridge and Culvert Replacement Project | Ukiah, CA – City of Ukiah Storm Drainage Study | Ukiah, CA
– Hanson Russian River Floodplain Restoration | Near Windsor, CA
GHD Clity of Ukiah Talmage Road Rehabilitation Project 26 Key Personnel Qualifications
MS, Structural
Engineering
BS, Engineering
Civil Engineer: CA
#51369
Structural Engineer: CA
#4229
Steve Burns, SE, ME | Structural Engineering
Man Hours Committed to the Project: 89
Responsibilities: Steve Burns will provide the structural engineering design for the project.
Steve is a professional engineer with over 30 years of experience in the design and analysis of building, civil, and bridge structures. Steve has extensive experience with both new construction and repair and/ or retrofit. In the building industry, he has performed new building design, as well as seismic retrofit for concrete, steel, masonry, and wood structures.
Relevant Project Experience
– Stony Point Road Widening | Santa Rosa, CA
– Snyder Lane Widening | Rohnert Park, CA
– Coyote Creek Trail – Brokaw Road to Union Pacific Railroad | San Jose, CA MPA, Public
Administration
BA, Environmental
Studies and Planning
Kristine Gaspar | Resource Agency Permitting
Man Hours Committed to the Project: 38
Responsibilities: Kristine Gaspar will coordinate the resource agency permitting for the project.
Kristine's experience includes 25 years of environmental planning, CEQA compliance, resource agency permitting, data research and analysis, grant writing, and community surveys. Kristine has been involved in environmental analysis on a wide variety of projects from private development to infrastructure projects, including roadway, trails, schools, recycled water, and park facilities. She is currently the project manager for the Laguna Treatment Plant Compliance project and Ellis Creek Water Recycling CEQA Compliance project. Kristine’s projects are often complex with multiple deadlines.
Relevant Project Experience
– SMART Larkspur Extension | Marin County, CA
– Healdsburg Five-Way Roundabout and Culvert Improvements | Healdsburg, CA – Fulton Road Widening Improvement Project, Phases I and II | Santa Rosa, CA
GHD Clity of Ukiah Talmage Road Rehabilitation Project ix → Fee Proposal
04
GHD Clity of Ukiah Talmage Road Rehabilitation Project 27
4. Fee Proposal
As requested in the RFP, GHD's fee proposal has been
submitted in a separate email titled, "Talmage Road
Rehabilitation Project - Fee Proposal" and sent to Andrew Stricklin at [email protected].
If selected for this project, we will work with you to make any adjustments to the scope of work and fee proposal so both align with the City's needs and expectations for this project.
GHD Clity of Ukiah Talmage Road Rehabilitation Project x → References
05
GHD Clity of Ukiah Talmage Road Rehabilitation Project 28
5. References
Our Experience with Public Agencies
GHD has been serving communities in Northern
California for over 70 years and has a long history of
working collaboratively with regional municipalities. As long‑standing members of the local community, we have
a vested interest in the prosperity of this region. We are proud of the long lasting, high-quality projects we’ve
developed for our municipal clients in the area and look forward to continuing our relationship with the City as a high value client.
Our City of Ukiah Experience
GHD has been working with the City of Ukiah for over
20 years. Recent projects we've completed or will soon
complete for the City include the Redwood Business Park Transportation Improvements, the Downtown Streetscape,
Road Diet and Utilities Project, Phases 1 and 2, and the Great Redwood Trail, Phases 1 - 4. Our familiarity with the City's infrastructure and resources gleaned from previous work, have given us a head start on this project.
Relevant Roadway Experience
GHD has extensive experience with complete streets,
roadway reconstruction, sidewalks, ADA accessibility,
pedestrian bridges, and LID features similar to what the City is undertaking with this project. Our experience
proves that GHD's team has the knowledge and resources
to streamline this project. In the following pages, we
highlight our relevant project experience. Client reference information has been included in Table 3 below.
“GHD and their team led a comprehensive public
outreach, permitting, and engineering design process
for this high-profile and contentious roundabout and
complete utilities replacement project in the core
of our downtown. [The] team excelled at balancing
the needs of the community, businesses, and City
while meeting numerous project challenges and the
project schedule on this complex roundabout with
rail project.”
— Brent Salmi, PE, Former City of Healdsburg Public
Works Director in reference to the Healdsburg
Avenue Improvements and 5-Way Roundabout
project.
Firm Reference Related Project(s)
GHD Inc. Tim Eriksen, Public Works Director and City Engineer City of Ukiah
300 Seminary Drive
Ukiah, CA 95482
+1 707 463 6280
[email protected]
Ukiah Downtown Streetscape and Road Diet,
Phases 1 & 2, Ukiah, CA
Redwood Business Park Transportation
Improvements and Talmage Road Interchange,
Ukiah, CA
Ukiah Rail with Trail, Phases 1 - 3 (The Great
Redwood Trail), Ukiah, CA
GHD Inc. Lynden Kobayashi, WSP (Client Representative)
Guam Department of Public Works
590 South Marine Corps Drive ITC Building
Suite 421
Tamuning, Guam 96913
+1 671 988 4225
[email protected]
Route 14 Resurfacing (Route 1 to Archbishop
Felixberto Flores Circle), Guam
GHD Inc. Sara Mathews, Assistant Engineer
City of Santa Rosa
69 Stony Circle
Santa Rosa, CA 95401
+1 707 543 3866
[email protected]
Tera Linda Sewer and Water Replacement (with
Roadway Reconstruction), Phase 1, Santa Rosa,
CA
Table 3. Team References
GHD Clity of Ukiah Talmage Road Rehabilitation Project 29 Firm Reference Related Project(s)
Crawford &
Associates, Inc.
Netra Khatri, City Engineer
City of Arcata
525 9th Street
Archata, CA 95521
+1 707 825 2173
[email protected]
City of Arcata WWTP Phase 1
Improvements, Arcata, Humboldt County,
CA: CAInc provided pavement engineering
services, a summary of conditions
encountered, laboratory test results, and
foundation recommendations for various
structures including CIDH piles, shallow mat
foundations, grading, and utilities.
Crawford &
Associates, Inc.
Diane O'Connor, Assistant City Engineer
City of Fort Bragg
416 North Franklin Street
Fort Bragg, CA 95437
+ 1 707 961 2824, ext. 134
[email protected]
City of Fort Bragg Raw Water Pipeline
Replacement - Phase II, III, IV, and V Design
Project, Fort Bragg, CA: CAInc completed
geotechnical design for pipe design and
provided recommendations for approximately
15,000 linear feet of 10” diameter pipeline.
“I appreciate the professionalism and flexibility you and your team demonstrated during the design. The project went well and your design deserves a lot of the credit. Thank you for your work on this. I look forward to working with you on more projects like this in the future.” - Patrick Barnes, Former Deputy City Engineer, City of Rohnert Park In reference to the City's 2011 Various Streets Overlay Project
GHD Clity of Ukiah Talmage Road Rehabilitation Project 30
Bringing Expertise in
Road Rehabilitation
Project Location
Federal FundingDowntown/Adjacent BusinessCaltrans CoordinationHwy 101 (or former)Road DietComplete StreetRoad Design/RehabTraffic Signals/LightingADA CompliancePedestrian Amenities (street furniture, refuse containers, etc.)Signing/StripingStormwater Mgmt/ LID DesignPed/Bike CorridorPermittingHigh ProfileUtility CoordinationPublic OutreachUrban Design Ukiah Downtown Streetscape and Road Diet, Phase 1 Ukiah, CA Ukiah Downtown Streetscape and Road Diet, Phase 2 Ukiah, CA Redwood Business Park Transportation Improvements & Talmage Road Interchange Ukiah, CA Fulton Road Widening PS&E, Guerneville Road to Piner Road Santa Rosa, CA Roundabout Intersection Improvements, Southwest Blvd at Commerce Blvd Rohnert Park, CA Petaluma Complete Streets Petaluma, CA Petaluma Blvd Road Diet Phase 2 Petaluma, CA Jaguar Way/Windsor Road Pedestrian & Bicycle Improvements Windsor, CA Healdsburg Avenue Improvements Healdsburg, CA Terra Linda Sewer & Water Replacement & Road Reconstruction Santa Rosa, CA Zone 1-2 Intertie Sonoma, CA
Downtown Redding Streets Circulation Redding, CA First & Second Street Roundabouts along California Blvd. Napa, CA California Blvd/Taft Street Improvements San Luis Obispo, CA Willits Main Street Road Diet Willits, CA Downtown Redevelopment Cloverdale, CA Downtown Improvements Petaluma, CA Downtown Improvements (Old Redwood Hwy) Cotati, CA Downtown Improvements - Main Street Fort Bragg, CA Rohnerville Road STIP/HSIP Fortuna, CA State Street Plan Ukiah, CA
Street Smart Sebastopol Sebastopol, CA TownGreen/Downtown Revitalization Windsor, CA Stony Point Road Widening Santa Rosa, CA Mission Bay Redevelopment San Francisco, CA Table 4. Summary of Relevant Road Rehabilitation Experience
GHD Clity of Ukiah Talmage Road Rehabilitation Project 31 The challenge
A significant chapter in the successful evolution of Ukiah's downtown, the Downtown Streetscape and Road Diet project has become a critical part of Ukiah's urban fabric and image, and a catalyst for growth in the area. The intent of the road diet improvements was to transform the existing four-lane State Street cross section into a three-lane cross section with one travel lane in each direction and a Two-Way Left-Turn (TWLT) lane in the center and parallel parking on both sides of the street. The TWLT lanes transition to left turn pockets at intersections. The project also replaced all water and sewer utilities in coordination with a power and telecommunication undergrounding project.
Our response
The project included the design of new streetscape and utility improvements along State Street from Mill Street to Henry Street, approximately nine city blocks. The project also included improvements on Perkins Street and Standley Street from School Street to Main Street.
Specific components of the project included sidewalk widening and construction of curb ramps and bulb outs for ADA compliance and pedestrian safety, relocation of drain inlets and pipes, construction of LID stormwater enhancement features, installation of new street lights, and installation of street sidewalk furniture. New traffic signal controllers were installed at Mill Street, Perkins Street, and Standley Street.
Client
City of Ukiah
Client Contact
Tim Eriksen, Public Works Director and
City Engineer
+1 707 463 6280
[email protected]
Date
February 2019 – February 2020 (Design)
March 2020 - June 2021 (Construction)
Construction Cost
$7,513,698.43 (Utilities Portion $3,375,280)
Relevance
– Roadway improvements and
rehabilitation
– Pedestrian safety
– LID stormwater enhancements
Ukiah Downtown Streetscape, Road Diet and
Utilities Project, Phase 1
Ukiah, California
This project has
become a critical
part of Ukiah's urban
fabric and image and a
catalyst for growth in
the area.
Sidewalk improvements, ranging from 8 feet to 15 feet,
were designed to ADA accessible standards and included
bulb-outs with Rectangular Rapid Flashing Beacons (RRFB) and stamped asphalt at each street intersection, intended to enhance pedestrian safety. New sidewalks, driveways
and ramp improvements conform to existing private
improvements at the public right of way or building faces.
The widened sidewalks include new planter areas, street trees, tree grates, street furnishings (benches, recycling and trash containers, bicycle racks, signage, bollards, street lights, etc.). Along Perkins Street and Standley Street, outdoor restaurant and café seating has been enhanced with the widening of sidewalks.
The road diet portion was designed to maintain and enhance the State Street corridor vehicular capacity, reduce
intersection congestion by providing center turn pockets that allow left turning vehicles to move out of the main flow of traffic, enhance pedestrian visibility and safety, and provide space for streetscape and pedestrian improvements.
Utility improvements on State Street included approximately 2,700 lineal feet of new, 8-inch PVC sanitary sewer line, complete with new manholes, service laterals and cleanouts, and approximately 2,700 lineal feet of new 12-inch PVC water main line, complete with new water valves, fire hydrants, and water service lines with meter boxes.
"Ukiah's new downtown streetscape project
looks amazing! Wider sidewalks and ADA
improvements, tree planting and landscaping,
new street lighting and street furniture - just
wow! It's been a ton of work by the City, and
downtown businesses have been incredibly
patient. Congrats!"
— California Senator Mike McGuire
→ The Power of Commitment
GHD Clity of Ukiah Talmage Road Rehabilitation Project 33 Ukiah Downtown Streetscape and Utility Project
Phase 2, Ukiah, California
The challenge
Continuing the growth and revitalization of Downtown Ukiah, Phase 2 of the Ukiah Downtown Streetscape project includes the sections of State Street that bookend Phase 1. The project combines three separate components: Downtown Streetscape, Rule 20 Undergrounding, and water and sewer utility replacement.
Though this project's schedule is not as aggressive as in the previous phase, it has similar challenges including the potential for abandoned, former heating oil tanks (Underground Storage Tanks (USTs)) within the project limits, identifying the existing geometry of the utilities, addressing issues and constraints, and different design strategies for the pavement rehabilitation.
Our response
GHD's team is providing professional engineering services for the construction of the improvements including civil, survey, LID, electrical, utility coordination and design, traffic, landscape architecture, right of way, geotechnical, environmental compliance, and hazardous materials. While continuing the streetscape designs vetted as part of Phase 1, we will also explore different design elements that may not have fit in Phase 1, but could possibly be incorporated into this phase. GHD is leveraging the experience and knowledge gained in Phase 1 to address the similar challenges in Phase 2.
Project outcome
This project will create the northern and southern gateways into the heart of Downtown Ukiah and continue the revitalization and growth that Phase 1 began.
Client
City of Ukiah
Client Contact
Tim Eriksen, Public Works Director and
City Engineer
+1 707 463 6280
[email protected]
Date
2021 – Ongoing
Construction Estimate
$8.4 million
Relevance
– Roadway improvements
– Pavement rehabilitation
– LID stormwater enhancements
– Survey
– Environmental permitting
GHD Clity of Ukiah Talmage Road Rehabilitation Project 34 Client
City of Ukiah
Client Contact
Tim Eriksen, Public Works Director and
City Engineer
+1 707-463 6280
[email protected]
Date
May 2018 – February 2020
Construction Cost
$5,144,628
Relevance
– Roadway improvements/pavement
rehabilitation
– Pedestrian/bicycle facilities
– Survey
– Environmental
Awards
The project was recognized by ACEC
and ASCE with numerous awards for
client service and design innovation.
The challenge
The project involved the design of roadway improvements in the Redwood Business Park commercial business and retail area of the City, and is related to planned development of the business park and the environmental requirement to improve the roadways and intersections that serve the area before allowing further large commercial development. The purpose of the project is to repair a large section of failed asphalt concrete pavement, widen roadways to accommodate increases in traffic, and improve pedestrian accessibility and shared bicycle facilities. A major element of the project is the design of the new pavement for Airport Park Boulevard and Talmage Road. The project reconstructed approximately 2,300 feet of failed pavement, as well as 1,500 feet of pavement overlay to accommodate planned heavy truck traffic. A key challenge was to accommodate existing shallow utilities while still achieving the design traffic loading.
Our response
GHD was competitively selected for the planning and design of this award‑winning transportation improvement project in the City of Ukiah. GHD worked closely with subgrade and pavement fabric manufacturers to design a pavement section of reduced thickness compared with a traditional design that improved subgrade bearing capacity, while also increasing the design life of the pavement. To improve pavement tensile strength and longevity the project used a high strength aramid (Kevlar©) fiber reinforcement in the HMA mix design. Other elements of the project included new ADA compliant sidewalks and pedestrian ramps, modified and new traffic signals with video detection, the Redwood Business Park Transportation
Improvements and Talmage Road Interchange
Ukiah, California
GHD worked closely
with subgrade and
pavement fabric
manufacturers to
design a pavement
section of reduced
thickness that
improved subgrade
bearing capacity and
increasing the design
life of the pavement.
Project outcome
GHD provided construction management. The City of
Ukiah performed construction inspection. The project was successfully completed in February of 2020.
addition of turn lanes and changes in roadway geometry
to efficiently handle higher volumes of traffic and larger vehicles, and pedestrian and bicycle improvements
consistent with the City’s Bicycle and Pedestrian Plan.
To improve stormwater quality and volume capture, the
project constructed an innovative system utilizing Tire Derived Aggregate (TDA) as the permeable material in
subgrade bioretention cells located behind existing curb and gutter along the roadway corridor. The use of TDA in this project also diverted approximately 35,000 used tires from California landfills. The approach to the bioretention system design maintained and protected nearly all existing trees and landscaping in the Redwood Business Park.
The project also used 100% recycled Class 2 Aggregate
Base (CL2AB) made from demolished Portland cement
concrete roadway panels previously salvaged by Caltrans from a project that repaired sections of U.S. 101 in the Ukiah area. A portable processing plant was set up at
the Contractor’s staging area to process the concrete
panels into CL2AB and deliver the material directly to the project. Over 11,000 cubic yards of recycled CL2AB was
incorporated into the project, significantly reducing the use of virgin mined aggregate.
The project is integrally related to the adjacent Talmage Road Interchange project, which reconstructed the
northbound U.S. 101 on- and off-ramp system. Roadway
widening improvements required coordination with
resource agencies for wetland mitigation and right-of-way encroachments.
“GHD’s Design and Construction Management
Teams far exceeded the City’s expectations
especially in a project of this complexity. They
were right there to handle every question and issue
in the moment.”
“Our Community was sceptical this project would
improve traffic flow. Since completion, all the City
had heard from the community is how much better
traffic is now, than before, thanks to GHD.”
- Tim Eriksen, City of Ukiah Public Works Director and City Engineer
→ The Power of Commitment
GHD Clity of Ukiah Talmage Road Rehabilitation Project 36 Ukiah Rail with Trail, Phases 1 - 3
(The Great Redwood Trail) | Ukiah, CA
Challenge
While most of the right of way is owned by the North Coast Railroad Authority (NCRA), the Northwestern Pacific Railroad Company (NWPRR) serves as the contract operator. Together, the two entities share responsibility for the safety, operation, and maintenance of the railroad segment. Since the NCRA, NWPRR, and the City of Ukiah have a vested interest in this project, it became critical for GHD to understand the needs of each stakeholder.
Our response
GHD served as Prime Engineer providing a full suite of environmental, engineering, and permitting services (as well as SWPPP preparation), for a Class 1, ADA-accessible, non-motorized trail along one mile of the NCRA Railroad Corridor between Gobbi Street and Clara Avenue in the City of Ukiah. This is the first Rail-with-Trail (RWT) project to be designed and constructed in NCRA right of way in Mendocino County.
Regarding the SWPPP, GHD prepared a site-specific assessment to determine risk level, which is a function of the erosive potential of the soil and receiving water body risk during periods of soil exposure. Risk Level 2 would require sampling of stormwater for pH and sediment, and significantly more effort than a Risk Level 1 site. Risk level 3 sites may require Bioassessment studies of the receiving water body, and active stormwater treatment systems. GHD determined Phase 1 to be Risk Level 2. We then prepared the SWPPP document as required for the calculated risk level, which featured site maps and water pollution control drawings, a construction site visual monitoring program, a sampling and analysis plan for non-visible pollutants, a sampling and analysis Client
City of Ukiah
Contact
Tim Eriksen, Public Works Director and
City Engineer
Public Works Department
+1 707 463 6280
[email protected]
Date
Phase 1: 2012 – December 2014
Phase 2: November 2017 – December 2019
Phase 3: September 2018 – December
2019
Value
Phase 1: $0.68 million
Phase 2: $1.83 million
Phase 3: $1.84 million
Relevance
– Rail car pedestrian bridges
– Pedestrian/bicycle pathway
– LID stormwater enhancements/
compliance
plan for pH and sediment, a construction site non-visible pollutant sampling program, selection of appropriate best management practices (BMPs) for erosion and sediment
control and for construction site management, and a partial water pollution control schedule. GHD provided Notice
of Intent (NOI) information suitable to initiate the waste discharge permit process using the State’s Stormwater
Multiple Application and Report Tracking System (SMARTS).
Construction began in 2013 with about 4,300 feet
of new paved trail along the west side of the railroad
tracks, encompassing three street crossings and several connections to other adjacent streets along the alignment.
Because of GHD’s familiarity with the design and challenges during construction, the City felt that GHD was best suited to perform construction management services.
Applicable Permits: NCRA Encroachment Permit; California Public Utilities Commission (CPUC) GO-88 Modification of Existing Rail Crossing; SWPPP; CDFW Lake or Streambed
Alteration Permit; Division of the State Architect (DSA) Access Compliance Approval; Caltrans ATP Construction
Allocation Request (which requires the listed permits.) Outcome
This non-motorized trail project garnered overwhelming
community support; in addition to its inherent recreational value, it provides pedestrians and cyclists with safe access to amenities such as parks, a museum, restaurants, and a hospital.
This is the first Railwith-Trail (RWT)
project to be designed
and constructed in
NCRA right-of-way in
Mendocino County.
→ The Power of Commitment
GHD Clity of Ukiah Talmage Road Rehabilitation Project 38 Terra Linda Sewer and Water Replacement (with
Roadway Reconstruction), Phase 1
Santa Rosa, California
The challenge
The water mains on Terra Linda Drive had been identified as fire flow deficient.
Placed in 1961, the Asbestos-Cement (AC) sewer mains have experienced previous inflow and infiltration issues during rain events. The water and sewer pipelines on Tera Linda Court are the same age and material. For cost effectiveness, the City wanted to replace all the water mains and sewer pipelines at the same time.
The project involved the replacement of approximately 1,600 LF of water main and 1,500 LF of sewer pipelines on Terra Linda Drive and Terra Linda Court. GHD designed new upsized 10-inch water and 8-inch sewer PVC C900 pipelines in order to meet the fire flows, correct sub-standard slopes, and maximize utility separation where possible. Additional design items included eight manholes, four hydrants and associated water/sewer lateral, cleanout and meters. The project also included 53,000 SF of full pavement restoration along Terra Linda Drive and Terra Court, and curb and gutter repairs.
Key issues for this project included confirming the pipeline alignments and profiles, reconnecting laterals and meters with minimal disruption to the residents while maintaining access to the appurtenances, maintaining minimum 10-foot separation between the sewer and water main where feasible, and landscaping restoration work.
Client
City of Santa Rosa
Client Contact
Sara Mathews
+1 707 543 3866
[email protected]
Mark Kasraie, Supervising Engineer
+1 707 543 3857
[email protected]
Date
March 2020 – December 2021
Construction Cost
$2.3 million (Estimate)
Relevance
– Roadway reconstruction
– Curb and gutter repairs
– Water and sewer replacement
The alignments for
the 40% submittal
were prepared with
sufficient detail that
the City allowed
GHD to skip the 65%
submittal and proceed
straight to 90% design.
Our response
During the pre-design phase, GHD prepared a technical
memorandum and conceptual drawings with the proposed
alignments for the sewer and water main. Based on City
feedback and a design review workshop, the alignments
were revised for the 40% submittal and prepared with
sufficient detail, that the City allowed GHD to skip the 65% submittal, and proceed straight to 90% design. The
90% design included full plan and profiles for the sewer and water main alignments, incorporating the 10-foot
separation where possible, and including a water main
design that allows the existing main to remain in service, while the new main was being constructed. The 90% design also included cross sections every 25 feet for the full pavement restoration in hilly terrain. The fire hydrants also included a small retaining wall around them to hold back the soil in sloped areas.
Project outcome
The project was completed in December 2021 on schedule
and within budget. Frequent communication with the City allowed the design to meet their expectations regarding alignment, connections, and paving.
→ The Power of Commitment
GHD Clity of Ukiah Talmage Road Rehabilitation Project 40 The challenge
The existing roadway was over-designed as a 6-lane arterial street with a center two-way left-turn lane. As a result, pedestrian safety is an issue due to long crossing distances, and vehicles often straddle lanes. There are also frequent accidents because the road is so wide vehicles meander and travel at speeds above the posted speed limit. The Guam Department of Public Works wants to improve safety along the corridor and enhance multi-modal transportation features to make it more bicycle and pedestrian friendly.
Our response
This project resurfaced and restored the major arterial roadway, Route 14 (Chalan San Antonio), from south of Route 1 (South Marine Corps Drive) north to and including the Archbishop Felixberto Flores traffic circle, and made improvements to vehicular safety and pedestrian and bicycle mobility. GHD's design included a “road diet,” achieved by narrowing the existing roadway and reducing the number of travel lanes from two to three lanes in each direction to two lanes in each direction with center left turn pockets and TWLT lanes. The project included new raised medians, new pedestrian crossings, new signing and pavement markings, new and modified drainage inlets, new wider sidewalks and ADA compliant curb ramps, new driveway curb cuts, and striped bike lanes. The existing Archbishop Felixberto Flores traffic circle was also modified and reconstructed and addressed pavement failures within the context of a 2R project, and improved safety and operations by incorporating elements of modern roundabout design standards as much as practical without modifying the existing inscribed circle.
Route 14 Resurfacing (Route 1 to Archbishop
Felixberto Flores Circle), Guam
Client
Guam Department of Public Works
Client Contact
Lynden Kobayashi, WSP (client
representative)
Deputy Director of Public Works
+ 1 671 646 2927
lynden.kobayashi @ wsp.com
Date
2019 - 2021
Construction Cost
$17 million (estimate)
Relevance
– Roadway rehabilitation
– Pedestrian/bicycle safety
– New sidewalks
– ADA compliant curb ramps
This project resurfaced
and restored the major
arterial roadway and
made improvements to
vehicular safety and
pedestrian and bicycle
mobility.
Project outcome
GHD provided a high-quality design. Organized QC
reviews were performed on every deliverable, and all scope requirements were met. GHD’s project manager maintained a high level of coordination and communication with
DPW, the PMT and other agencies to ensure compliance
with design requirements and project concurrence. GHD
sustained positive client interaction throughout the project life. Design services were completed within the original project schedule. Additional change order efforts were
completed within the original schedule.
Compliance with Project Schedule: Design services were
completed within the original project schedule. Additional efforts associated with change orders were completed
within the original schedule.
Cost Control: GHD performed all services within the
budget. Change orders were issued for additional surveying and mapping efforts to upgrade an old survey, hydrology / hydraulic analysis scope changes, and services to rebid the project. GHD coordinated closely with DPW and the
PMT to address all stakeholder and agency comments and
concerns prior to finalizing the design.
Design Innovation: Modern roundabout design principals
to improve safety, first multimodal “road diet” project on Guam to accommodate all transportation modes, digital
video traffic counting for accuracy, and aramid fiber
reinforced hot mix asphalt toimprove pavement strength. → The Power of Commitment
GHD Clity of Ukiah Talmage Road Rehabilitation Project 42 The challenge
The Arlen Drive and East Cotati Avenue Overlays Project was a federally funded project that overlaid and reconstructed segments of Arlen Drive and East Cotati Avenue within the City.
Our response
Professional services included design, environmental review, and bid phase support. The project included the removal of failed asphalt concrete pavement, crack sealing, edge and conform grinding, HMA overlay, pavement reinforcement fabric, adjustment of utility and monument covers to grade, replacement of existing sanitary sewer manhole covers with City Standard hinged/locking manhole covers, removal and replacement of select areas of broken curb and gutter, replacement of vehicle traffic detector loops, addition of bicycle detector loops, and pavement markers, markings and signs. The design was required to comply with specific federal environmental requirements regarding disturbance of subgrade and ADA ramp replacement, as well as other federal and state environmental requirements for funding.
Project outcome
Design of the project was completed within the design budget and on schedule. Construction was completed in 2012.
Arlen Drive and East Cotati Avenue Overlays
Rohnert Park, California
Client
City of Rohnert Park
Client Contact
Patrick Barnes, Former Deputy City
Engineer
(Retired/unavailable)
Date
2011 - 2012
Value
$700,000 (Construction Cost Estimate)
Relevance
– Roadway overlay and
reconstruction
– Pedestrian and bicycle safety
– ADA accessibility
GHD Clity of Ukiah Talmage Road Rehabilitation Project 43 The challenge
The 2011 Various Streets Overlay Project was part of the City’s annual street overlay and maintenance program. The project overlaid and reconstructed several collector streets within the City, including segments of Santa Dorotea Circle, and Camino Colegio from Southwest Boulevard to East Cotati Avenue.
Our response
Professional services included geotechnical field investigations, design, environmental review, and bid phase support. The project included the removal of failed asphalt concrete pavement, crack sealing, edge and conform grinding, HMA overlay, pavement reinforcement fabric, adjustment of utility and monument covers to grade, replacement of existing sanitary sewer manhole covers with City Standard hinged/locking manhole covers, removal and replacement of select areas of broken curb and gutter, replacement of vehicle detector loops, addition of bicycle detector loops, and pavement markers, markings and signs.
In addition to adding new bike lanes to Camino Colegio, the project also replaced 38 pedestrian ramps with new ADA compliant ramps, added detectable warning surfaces to 34 existing pedestrian ramps to make them ADA compliant, and added new flashing red beacons to an existing stop-controlled intersection to improve driver awareness and pedestrian and bicycle safety.
Project outcome
Design of the project was completed within the design budget and on schedule.
Construction was successfully completed in January 2012. 2011 Various Streets Overlay Project
Rohnert Park, California
Client
City of Rohnert Park
Client Contact
Patrick Barnes, Former Deputy City
Engineer
(Retired/unavailable)
Date
January 2011 - January 2012
Value
$588,909 (Bid Amount)
Relevance
– Roadway overlay and
reconstruction
– Pedestrian and bicycle safety
– ADA accessibility
GHD Clity of Ukiah Talmage Road Rehabilitation Project 44 Perkins Street and Orchard Avenue
Intersection Improvements
Client: City of Ukiah
Date: 2012
Value: $130,000 (GHD Fees)
Relevance
– Intersection/roadway improvements
Description: This project involved the design of traffic signal modifications and geometric improvements to
add an additional right turn lane with a right turn overlap phase at this heavily utilized intersection near the on and off ramps for the U.S. 101 East Perkins Street interchange in Ukiah, California. Signal improvements included new
signal poles and safety lighting, pedestrian and vehicle signal equipment, wireless vehicle detection system, a
new controller cabinet, and new signal conductor cables for the entire intersection. Other improvements included minor grading and storm drainage improvements, paving,
striping for the new turn lane and adjacent lanes and
crosswalks, curb and gutter, sidewalk, and relocating signs from the demolished signal poles to the new signal poles.
This project design was completed in September 2009,
and modified in January 2012 to include federal Economic Development Administration funding requirements.
Construction of the project was successfully completed in June 2012.
Ukiah Courthouse Site and Roadway
Improvements
Client Name: Rau and Associates, Inc.
Date: March 2017
Construction Cost: Unavailable
Relevance
– Stormwater and LID design
– Hydraulic and flood analysis
– Bridge structural design
Description: GHD was retained by Rau and Associates to
perform stormwater and LID design, hydraulic and flood
analysis of Gibson Creek, and bridge structural design
for the redevelopment of the 11-acre Railroad Center
Property for commercial/business uses and associated
roadway, utility and stormwater infrastructure. The land is owned by the NCRA and NWPRR, a subsidiary of Union
Pacific Railroad. The site is generally bounded by East Perkins Street to the North, Leslie Street to the East, a residential neighborhood to the south, and the NWPRR
tracks to the west. Relevant elements of the project
include the extension of Hospital Drive south across
Gibson Creek and into the site as Courthouse Drive, a
new bridge over Gibson Creek, the extension of East Clay Street east across the railroad tracks and into the site, underground utilities, storm water management facilities, LID features, and related improvements. The connection
of East Clay Street to Peach Street at Leslie Street is a planned future improvement. The new courthouse
building and other commercial/business buildings are
proposed to be constructed as a future project. The City of Ukiah was a party of interest whose role was to assist with this redevelopment project because of its potential to positively impact downtown Ukiah.
GHD performed a HEC-RAS hydraulic analysis of Gibson
Creek for existing conditions and for the proposed
project site. This analysis was used to determine
feasible site improvements within the 100-year flood
plain and floodway, and for an application to FEMA for
floodplain revisions required to facilitate proposed site improvements. Efforts included preparing and submitting an application to FEMA for floodplain mapping revisions, and additional FEMA coordination.
GHD designed all the drainage systems and LID
improvements for the site, including preparing all hydraulic and water quality calculations, as well as a technical
memorandum meeting requirements for the Standard
Urban Storm Water Mitigation Plan (SUSMP) and hydraulic design documentation for the Ukiah Courthouse Site
and Roadway Improvements (Project) as required by the
City of Santa Rosa and County of Sonoma Storm Water
Low Impact Development Technical Design Manual. GHD
designed the traffic signal improvements for the extension of Hospital Drive across East Perkins Street into the site and prepare and submitted a GO-88B application to the
CPUC for approval of the improvements associated with
the new Clay Street at-grade rail crossing.
GHD Clity of Ukiah Talmage Road Rehabilitation Project 45 Single Route Safety Improvements
Client: Mendocino Department of Transportation
Relevance
− Pedestrian safety/connectivity enhancements
Description: GHD provided project design for corridor
safety enhancement, pedestrian connectivity, and
operations, which included addition of a center turn
lane and sidewalks throughout the project limits on
South State Street, a major north-south arterial in the Ukiah Valley. The proposed project extended from
approximately Blue Bonnet Drive, at the north end, to the creek crossing near Whitmore Lane on the south end.
Challenges included existing constraints along the over half-mile corridor and numerous adjacent connecting
roads with challenging conforms.
Gobbi Street Intersection Bridge and
Culvert Replacement Project
Client: City of Ukiah
Date: 2010
Value: $900,000
Relevance
− Bridge design
− Resource agency permitting
− Survey
− Hydraulic evaluation
Description: GHD was contracted by the City of Ukiah
to improve pedestrian access and intersection geometry
at the intersection of Gobbi Street, Oak Manor and
Babcock Lane. The intersection is bisected by Gibson
Creek, a tributary to the Russian River, in two locations.
The project included biological studies to support
regulatory agency permit applications; geotechnical
investigations; topographic, utility and right-of-way
survey; hydrology; and hydraulic evaluation of the new
stream crossings on Gibson Creek including evaluation
of new improvements in relation to existing FEMA
FIRM hydraulic models. The crossing designs included
pre-cast bottomless box culverts with a 20‑foot freespan supported on cast-in-place concrete drilled pile foundations. In addition, the new crossings were
designed to meet California Department of Fish & Game
(CDFG) fish passage criteria. GHD assisted the City in
developing the CEQA document, conducting biological
surveys and developing permit applications to secure
the CDFG Streambed Alteration Agreement, RWQCB
401 Water Quality Certification and the USACE 404.
This project received funding through the 2002 State
Transportation Improvement Program (STIP). The project
was constructed in 2010 for contract award amount.
Outcome: Fish passage criteria for listed salmonids had to be addressed during the design process as well as the poor soil conditions and liquefaction potential. GHD's
team collaborated with CDFW and other team members
to develop creative solutions. A stream simulation design approach was conducted and an engineered streambed
material consisting of a gradation of native streambed
gravels designed to remain stable at high flow events was placed through the bottomless box culvert. The poor soil conditions were mitigated through deepening specific
piers, which proved to reduce cost relative to a simple pier design and longer uniform pier lengths.
GHD Clity of Ukiah Talmage Road Rehabilitation Project 46 Orchard Avenue Extension Feasibility Study
Client Name: Mendocino County Department of
Transportation
Date: 05/2018 - 02/2020
Value:$150,000
Relevance
− Multimodal connectivity and safety
Goal: The goal of this project was to study the feasibility of an alternative north-south roadway corridor. This major collector is expected to be an extension of the existing Orchard Avenue that ends at the Ukiah City Limit with
Mendocino County.
Description: After securing a Community Based
Transportation Planning Grant, Mendocino County hired
GHD to prepare a feasibility study to assess the cost
of improvements for an alternate route along Orchard
Avenue to improve traffic operations, multimodal
connectivity, and safety. An additional north-south
thoroughfare is greatly needed within the Ukiah Valley
Area for improved circulation for commuters, visitors,
and regional transit, as well as providing an alternate emergency access (in case of closure of US 101 and/or
State Street).
The Orchard Avenue Extension would reduce congestion
and provide relief through Mendocino County and satisfies those transportation needs. Extending the road north from Brush Street along the preferred alignment will provide another route through the County and serve to improve
congestion along North State Street and US 101, as well as adding another route for trucks that do not have height limitations of that exist on US 101. To date, three public meetings have been held on the planned extension and
to provide a forum to ask for community input. They were held at the Mendocino County building on September 26,
2018, March 27, 2019, and on November 13, 2019 with a
formal presentation. The Feasibility Study was accepted by the Board of Supervisors in February 2020.
Orchard Avenue Bridge at Orr Creek and Related
Roadway Improvements
Client Name: City of Ukiah
Date: 2007
Value: $1,658,000 (Engineer's Estimate)
Relevance
− Bridge design
− Roadway improvements
Description: GHD performed preliminary engineering
through construction services for the design of a
four-lane, two-span, 85-foot concrete slab bridge
over Orr Creek in the City of Ukiah. The project
included approach roadways of 450 feet and 700 feet,
respectively, storm drainage channel modifications,
hydraulic and scour studies, and permit coordination.
A significant element in design was the creek capacity
and the bridge was designed to be above the 100-year
flood elevation. The critical challenge faced on this
project was the project schedule. Developments were
proposed on each side of Orr Creek near the bridge
location and therefore required a fast-track design. To shorten the design window, PDT meetings were held
every two weeks and the environmental study/approval
documents were hand walked through the process.
Outcomes: Due to permitting issues and the
development, the project was put on hold at a 95%
submittal stage and was rescheduled for completion.
GHD worked closely with the City and the developers to
meet the revised deadline.
GHD Clity of Ukiah Talmage Road Rehabilitation Project xi → Exceptions
06
GHD Clity of Ukiah Talmage Road Rehabilitation Project 47 − Construction staking, surveying, and testing
− Construction observation and inspection services,
including specialty inspections, other than those
services specifically included in the Scope of Services − Other services performed or furnished by GHD not
otherwise provided herein for the Scope of Services
Exceptions to the Insurance
Requirements and/or the Draft
Professional Services Agreement
There are a couple of minor revisions the City has
accepted on our most recent project agreement, and if
selected we would request the same revisions for this
project. Those revisions are summarized below:
6.0 INDEMNIFICATION
6.1 Insurance Liability
C. Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be
declared to and approved by the City. At the option of
the City, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects to the City, its officers, officials, employees and volunteers; or the Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. Any deductibles or self-insured
retentions shall be declared to the City and shall be paid by Consultant.
D. Other Insurance Provisions
4. All Coverages
Each Insurance policy required by this clause shall be
endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. Immediately upon notice to Consultant that the coverage under any insurancepolicy required by this Section D.4 is suspended, voided, canceled or reduced
in coverage or amount Consultant shall notify the City
in writing of such changes and shall provide substitute coverage that complies with this Section 6.1.D.
6. Exceptions
Assumptions and Exclusions to the
Scope of Services
− Filing of a record of survey with the County of
Mendocino is not required.
− Preparation of conformed construction documents
following the bid period is excluded, but can be
provided upon request.
− Construction period services, including bidding
assistance, review of submittals and RFIs, and
preparation of record drawings is excluded, but can be
provided upon request.
− All permit fees are excluded. It is assumed the City will pay permit fees.
− Studies and design of stormwater management
and stormwater quality improvements, to meet LID
requirements are excluded. These services can be
provided if it is determined during preliminary design
that they are necessary based on area disturbed by
the project.
− Sampling, testing, analysis, and development of
specifications and requirements for addressing
hazardous materials and contamination is excluded.
− Section 7 Consultation with either USFWS or NOAA
will not be required.
− All impacts can be avoided or mitigated on site.
Conceptual mitigation plan will suffice.
− No special-status wildlife or plant surveys will be
needed.
The following services are not included in the scope of work:
− Environmental assistance and permit documentation
− Right of way descriptions
− Public outreach
− Preparation of additional Bid Documents or Contract
Documents for alternate bids or prices requested by
the City for the project
GHD Clity of Ukiah Talmage Road Rehabilitation Project 48
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$ PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS ONLY AUTOS
NON-OWNED
OWNED SCHEDULED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH- STATUTEPER
(MM/DD/YYYY) LIMITS POLICY EXP (MM/DD/YYYY)
POLICY EFF LTR TYPE OF INSURANCE POLICY NUMBER INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $
AGGREGATE $
$
OCCUR
CLAIMS-MADE
DED RETENTION $
PRODUCTS - COMP/OP AGG $
GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $
DAMAGE TO RENTED
PREMISES (Ea occurrence) $
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY PROJECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2016 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
Willis Towers Watson Northeast, Inc.
c/o 26 Century Blvd
P.O. Box 305191
Nashville, TN 372305191 USA
GHD Inc.
4747 N. 22nd Street, Suite 200
Phoenix, AZ 85016
Additional Insured status can be granted as above only where required by written contract.
General Liability policy can be Primary and Non-contributory with any other insurance in force for or which may be purchased by Additional Insured where required by contract or agreement.
Waiver of Subrogation can be applied as above in favor of Certificate Holder where required by contract or agreement.
Umbrella/Excess Liability Follows Form over General Liability, Auto Liability and Employer's Liability.
To Whom It May Concern-GHD Inc
11/16/2021
1-877-945-7378 1-888-467-2378
[email protected]
Allied World Assurance Company US Inc 19489
Zurich American Insurance Company
Beazley Insurance Company Inc
16535
37540
W22873134
A
1,000,000
1,000,000
25,000
1,000,000
2,000,000
2,000,000
Y Y 0310-4497 12/01/2021 12/01/2022
B
1,000,000
07/01/2021 07/01/2022
Coll Ded: $500 Hired Physical Damag Comp Ded: $250
Y Y BAP 3757423-06
100000
A 1,000,000
Y Y 0310-4498 12/01/2021 12/01/2022 1,000,000
WC 0380936-06 B Y 1,000,000 No 07/01/2021 07/01/2022 1,000,000 1,000,000
C Professional Liability V29594200301 12/01/2021 12/01/2022 Each Claim:
Aggregate:
SR ID: 21843633 BATCH: 2312113
$2,000,000
$2,000,000
Willis Towers Watson Certificate Center
GHD Clity of Ukiah Talmage Road Rehabilitation Project A-iii Team Member Resumes
Appendix A
T 1 707 540 9687 | M 1 707 540 3376 | E [email protected] www.ghd.com Matt Kennedy PE, TE, ENV SP
Project Director
Location
Santa Rosa, CA
Experience
19 years
Qualifications/Accreditations
– MS, Environmental Engineering, University of Massachusetts, Amherst, MA, 2003 – BS, Environmental Resources Engineering, Humboldt State University, Arcata, CA, 2001 – Civil Engineer CA #68304; OR 83450PE; NV #24172; NM #23032; CNMI #528; GU #1337; HI #18171 – Traffic Engineer CA #TR 2385
– USACE/NAVFAC Certified Construction Quality Manager
– California Department of Transportation Certified Resident Engineer Key technical skills
– Multi-disciplinary engineering, project management,
program management, transportation, utility
systems, and sustainable civil engineering
Memberships
– American Society of Civil Engineers (ASCE);
American Water Works Association (AWWA);
Society of American Military Engineers (SAME)
Relevant experience summary
Matt is a licensed Civil and Traffic Engineer with 19 years of experience in the management and design of sustainable and resilient public infrastructure and facility projects. His experience includes a broad range of project types including traffic/transportation systems, utilities, sustainable site development, new and renovated buildings, storm drainage and LID, traffic signals, electrical distribution systems, pedestrian and bicycle facilities, striping and signing, retaining walls, water and wastewater treatment, and traffic control. His experience also includes planning, modeling and analysis capabilities including utility master planning, hydrologic and hydraulic modeling, water and wastewater process design, traffic and parking studies, circulation studies, and analysis and timing of signals. He is also experienced in land surveying and construction management.
Downtown Streetscape and Utility Project
Phase 1
Project Manager
City of Ukiah | Ukiah, CA | Feb. 2019 – June 2021
Matt was the project manager for this federally, state
and locally funded project that constructed a “road
diet” on State Street from Mill Street to Henry Street, approximately nine city blocks. The project reduced
the travel lanes, reducing congestion, improving
parking and multi-modal access, and enhancing the
downtown landscaping and streetscape. The project
constructed new sidewalks, curb and gutter, and
stormwater LID, and reconstructed the roadway.
State Street is the former Highway 101 and includes
sections of old concrete. The project also included
modification of three traffic signals and replacement
of 2,700 linear feet of sewer and water mains
including services and laterals. Construction value:
$12.4 million (bid)
Downtown Streetscape and Utility Project
Phase 2
Project Director
City of Ukiah | Ukiah, CA | 2021 - Ongoing
Matt is currently serving as the Project Director for this project, which continues the road rehabilitation,
streetscape and landscape improvements and water
and sewer utility replacement completed in Phase 1 in
the north to Norton Street and in the south to Gobbi
Street. The project is currently in design.
Redwood Business Park Transportation
Improvements
Project Manager, Construction Manager
City of Ukiah | Ukiah, CA | May 2018 – Feb. 2020
The project involved the reconstruction of an existing
roadway system in a developing business park and
retail area of the city. This project repaired a large
section of under-designed and failed pavement,
widened and improved roadways to accommodate
increases in traffic and heavy trucks associated with
planned future commercial and retail developments,
A GHD Principal
Matt Kennedy | Project Director
T 1 707 540 9687 | M 1 707 540 3376 | E [email protected] www.ghd.com and completed other associated improvements.
Elements of the project include pavement design and
roadway reconstruction for additional heavy truck
traffic, new and modified traffic signals to
accommodate current and future increases in traffic
volumes, the addition of lanes and changes in
roadway geometry to efficiently handle higher volumes
of traffic and larger vehicles, extensions of roadways
and utilities to serve new commercial development
areas, and the addition of innovative LID stormwater
quality systems using TDA. The use of TDA in the
project diverted over 35,000 used tires from landfills.
The project was recognized by American Council of
Engineering Companies (ACEC) and ASCE with
numerous awards for client service and design
innovation. Project value: $5.14 million (final).
Arlen Drive and East Cotati Avenue Overlays
Project Manager, Civil Engineer of Record
City of Rohnert Park | Rohnert Park, CA | Jan. 2011
– March 2012
The Arlen Drive and East Cotati Avenue Overlays
project is a federally funded project that overlays and reconstructs segments of Arlen Drive and East Cotati
Avenue in the City. Professional services included
geotechnical field investigations, design of
improvements, environmental review, and bid phase
support. The project includes the removal of failed
asphalt concrete pavement, crack sealing, edge and
conform grinding, hot mix asphalt overlay, pavement
reinforcement fabric, adjustment of utility and
monument covers to grade, replacement of existing
sanitary sewer manhole covers with City Standard
hinged/locking manhole covers, removal and
replacement of select areas of broken curb and gutter,
replacement of vehicle traffic detector loops, addition of bicycle detector loops, and pavement markers,
markings and signs. The design was required to
comply with specific federal environmental
requirements regarding disturbance of subgrade, as
well as other federal and state environmental
requirements for funding. Design of the project was
completed within the design budget and on schedule.
Construction value: $700,000 (estimate)
Various Streets Overlay Project
Project Manager, Civil Engineer of Record
City of Rohnert Park | Rohnert Park, CA | Jan. 2011
– Oct. 2011
The Various Streets Overlay project was part of the
City’s annual street overlay and maintenance program.
The project overlaid and reconstructed several
collector streets within the city, including segments of Santa Dorotea Circle, and Camino Colegio from
Southwest Boulevard to East Cotati Avenue.
Professional services included geotechnical field
investigations, design of improvements, environmental
review, and bid phase support. The project included
the removal of failed asphalt concrete pavement, crack
sealing, edge and conform grinding, HMA overlay,
pavement reinforcement fabric, adjustment of utility
and monument covers to grade, replacement of
existing sanitary sewer manhole covers, removal and
replacement of select areas of broken curb and gutter,
replacement of vehicle detector loops, addition of
bicycle detector loops, and pavement markers,
markings and signs. In addition to adding new bike
lanes to Camino Colegio, the project also replaced 38
pedestrian ramps with new ADA compliant ramps,
added detectable warning surfaces to 34 additional
pedestrian ramps to make them ADA compliant, and
added new flashing red beacons to an existing stopcontrolled intersection to improve driver awareness and pedestrian and bicycle safety. Design of the
project was completed within the design budget and
on schedule. Matt was personally recognized by the
City for his efforts and professionalism on this
project. Project value: $588,900 (bid)
Talmage Road Interchange Improvements
Project Manager & Construction Manager
City of Ukiah | Ukiah, CA | Dec. 2013 – Jun. 2018
This project involved the design of geometric
improvements to the existing freeway interchange at
US 101 and State Route (SR) 222 (Talmage Road).
The improvements are related to planned development
of the Redwood Business Park and regional growth.
GHD prepared a detailed traffic impact study,
biological assessment, hazardous materials
assessment, and a noise study for the project in
support of the required CEQA Environmental Impact
Report (EIR). The unique interchange design
minimizes demolition and includes median separation
with a partial traffic signal for westbound off-ramp
traffic and yield control for eastbound on-/off-ramp
traffic. The project included roadway reconstruction
and widening to accommodate additional traffic,
off-ramp geometry that accommodates dual Surface
Transportation Assistance Act (STAA) truck traffic,
realignment of the southbound off-ramps to improve
safety and visibility, new and modified traffic signals with both inductive loop and video detection, a
retaining wall, ADA compliant sidewalks and
pedestrian ramps, and bicycle improvements. Project
value: $1.86 million (bid)
Project Manager
Ukiah courthouse Stie and Roadway
Improvements | Rau and Associates, Inc. | Ukiah,
CA | Mar. 2017 (Design Completion)
GHD was retained by Rau and Associates, Inc. to
perform stormwater and LID design, hydraulic and
flood analysis of Gibson Creek and bridge structural
design for the redevelopment of the 11-acre Railroad
Center Property for commercial/business uses and
associated roadway, utility and stormwater
infrastructure. The project included the extension of
Hospital Drive south across Gibson Creek and into the
site as Courthouse Drive, a new bridge over Gibson
Creek, the extension of East Clay Street into the site, underground utilities, storm water management
facilities, LID features and related improvements.
Erik Fanselau | Project Manager
T +1 916 782 8688 | E [email protected] www.ghd.com Erik Fanselau PE, CFM, LEED AP
Project Manager
Location
Roseville, CA
Experience
23 years
Qualifications/Accreditations
– BS, Civil Engineering, California State University Sacramento, CA, 1999 – Civil Engineer, CA #64814
– Professional Engineer, CO #40007
– Certified Floodplain Manager, US-11-06045
– LEED AP, 10591588
Key technical skills
– Roadway Design
– Hydrology/Hydraulics
– Stormwater Quality
– Utility Design/Coordination
Memberships
– Association of State Floodplain Mangers
– United States Green Building Council
Relevant experience summary
Erik has over 23 years of civil engineering experience including design, project management, construction management, and utility coordination. His expertise includes drainage, hydrology and hydraulics, water quality design, roadway design, utility coordination, pipeline rehabilitation, pump station design, and erosion control plans.
R Line Light Rail Transit (Design/Build)
Deputy Project Manager/Drainage/Utilities Lead
Regional Transportation District | Denver, CO
Erik served as Deputy Project Manager and
Drainage/Utilities Design Lead for the $750 million
design/build of 10.5 miles of new Light Rail Transit
including Interstate Highway and local roadway
improvements, 8 Light Rail Stations, multiple light rail bridges, drainage way crossings and improvements, and
associated utility relocations. Hydraulic analysis was
required for two major creek crossings.
County Road 31 Improvements
Project Manager
U.S. Indian Health Service | Davis, CA
Erik served as Project Manager for 1,000 feet of road
widening and left-turn lane addition for a new medical
treatment facility for the U.S. Department of Indian
Health Service. The project also included field survey
and traffic control design. Roadway design calculations included taper length, acceleration length, and
deceleration length, storage, and bay taper.
Coordination with the onsite design was also necessary.
C-470 Improvements (Design/Build)
Utilities Discipline Lead
Colorado Department of Transportation | Highlands
Ranch, CO
As Discipline Lead on the $212 million project for 10
miles of roadway widening, Erik’s responsibilities
included coordination with third party utilities, preparing budgets, managing staff, and identifying utility risk.
Doyle Drive (Highway 101)
Drainage Discipline Lead
Caltrans | San Francisco, CA
Scope of the project included replacing over a mile of
bridge and roadway sections through the Presidio
property in San Francisco. The drainage work included a report, system layout, onsite and offsite analysis, bridge hydraulics, scour analysis, and water quality design.
Erik prepared three different water quality alternatives for each treatment location.
Erik Fanselau | Project Manager
T +1 916 782 8688 | E [email protected] www.ghd.com Hazel Avenue Bridge Widening
Drainage Discipline Lead
Sacramento County | Rancho Cordova, CA
The scope of this project included over two miles of road widening in eastern Sacramento County. The bridge was
widened from four lanes to six lanes, which included the widening of the bridge over the American River. Design
included site specific custom drainage inlet design and permanent water quality treatment.
Secret Ravine Bridge
Project Manager
Placer County | Penryn, CA
Erik served as Project Manager for a new 60-foot-long
vehicle bridge over Secret Ravine in Penryn, California.
The survey work included topographic survey, channel
cross sections, biological survey delineations, and
construction staking. The civil work included grading and erosion control. Erik also provided coordination with
each of the disciplines, contractor, and Placer County.
The bridge was designed to reduce the impact to the
environment regarding biological considerations and
hydraulic capacity. Erik performed the hydraulic analysis for the new bridge.
Las Tablas Road/Hwy 101
Drainage Discipline Lead
Caltrans | Templeton, CA
Erik performed a drainage study for the roadway
reconstruction and designed the storm drainage
improvements for the Las Tablas Road/Route 101
Interchange Interim Improvements in San Luis Obispo
County. Erik used StormCad to model the drainage
system and he prepared a technical memorandum and
exhibits for the project report.
Lamar Reliever Route
Drainage/Utilities Discipline Lead
Colorado Department of Transportation (CDOT) |
Lamar, CO
Erik served as the Drainage Discipline Lead on 10 miles of new roadway construction. The project included the
construction of the US 50 realignment and two new
interchanges. Erik’s duties included coordinating with
third party utilities and CDOT staff.
I-69 Construction Segments 7 & 8
Drainage Discipline Lead
Indiana DOT | Washington, IN
The project included 150 miles of new 4-lane freeway for Interstate 69 construction in Indiana. Segments 7 and 8 totalled approximately 10 miles. Scope included
roadway drainage as well as culvert hydraulics.
Sterling S-Curve
Drainage/Utilities Discipline Lead
CDOT | Sterling, CO
The project involved reconfiguring the downtown streets to add a new road alignment through an abandoned
railroad right-of-way and reconstruction of existing
roadway with new drainage facilities. Erik’s duties
included design, financial management, utilities
coordination, and management of design staff.
2017 General Engineering On-Call
Project Manager
City of Monument | Monument, CO
Erik was the Project Manager of a multi-discipline,
multi-firm team providing task order services including roadway, environmental, drainage, water, drainage,
structural, traffic, construction management, survey,
and utilities.
2019 Nevada County On-Call Engineering
Project Manager
Nevada County | Nevada City, CA
Erik served as the Project Manager of a multi-discipline team with several subconsultants to provide on-call
services to support operations, maintenance, and capital improvements for the County.
2019 City of Fountain On-Call Engineering
Project Manager
City of Fountain | Fountain, CO
Erik was the Project Manager of a multi-discipline,
multi-firm team providing task order services including roadway, environmental, drainage, water, drainage,
structural, traffic, construction management, survey,
and utilities.
Bothell Crossroads Improvements
Drainage Discipline Lead
City of Bothell | Bothell, WA
Erik prepared roadway drainage design with water
quality treatment for the Bothell Crossroads project. The proposed project consisted of shifting the existing
roadway several hundred feet as part of a congestion
relief project for an existing intersection.
T +1 425 563 6500 | E [email protected] www.ghd.com
Pat Tortora PE, LEED AP
Quality Assurance/Quality Control
Location
Seattle, Washington
Experience
25 years
Qualifications/Accreditations
– Civil Engineer, CA #80067, WA #42517, OR #50400, ID #17342, GU #1873 – LEED Accredited Professional
– BS, Civil Engineering, Oregon State University, Corvallis, OR, 2013 Key technical skills
– Civil engineering, roadways, paths, utilities, and site design
Memberships
– ASCE
Relevant experience summary
Pat has 25 years of experience in providing planning, design, and construction engineering solutions to public and private clients with an emphasis on roadways, pathways, commercial, and industrial site design in collaboration with multi-disciplinary teams. For municipal entities, school districts, and governmental organizations throughout California, Southeast Washington, the Portland Metro Area, and Guam, Pat has overseen civil site infrastructure improvements that attend to stormwater quality concerns, utility infrastructure, pedestrian and vehicular safety measures, and sustainably minded, comprehensive sewer, water, and civil site work.
Downtown Streetscape and Utility Project
Phase 1
Engineering Lead
City of Ukiah | Ukiah, CA | Feb. 2019 – June 2021
Pat Served as the Engineering Lead for this project,
which included the design of new streetscape and utility improvements along State Street from Mill Street to
Henry Street, approximately nine city blocks. The project also included improvements on Perkins Street and
Standley Street from School Street to Main Street.
Specific components of the project included sidewalk
widening, construction of curb ramps and bulb outs,
relocation of drain inlets and pipes, construction of LID stormwater enhancement features, installation of new
streetlights, enhanced pedestrian crossings with RRFB
and stamped asphalt crosswalks, and installation of
street furniture. A new traffic control signal was installed at Mill Street, Perkins Street and Standley Street.
Construction value: $12.4 Million (Bid)
Great Redwood Trail Phases 1, 2 & 3
Project Manager
City of Ukiah | Ukiah, CA | Oct. 2012 – Dec. 2014
(Phase 1); Nov. 2017 – Dec. 2019 (Phase 2); Sep.
2018 – Dec. 2019 (Phase 3)
Pat was responsible for the delivery of construction
ready PS&Es for three phases of the Great Redwood
Trail. GHD is the design engineer for this Class I trail along North Coast Railroad Authority (NCRA) Railroad
Corridor. The trail provides pedestrians and cyclists with safe access to amenities such as parks, a museum, and
a hospital. In 2015, the first phase was the first Rail-withTrail project to be designed and constructed in NCRA right of way in Mendocino County. The second two
phases were constructed the winter of 2019. GHD
provided a full suite of environmental, engineering, and permitting services, as well as SWPPP preparation.
Phase 2 and 3 contains two bridges, one over Doolin
Creek and one over Orr Creek to allow emergency
vehicles to access all portions of the trail from a single direction. Project value: $680,000 (Phase 1); $1.83
Million (Phase 2); $1.84 Million (Phase 3)
Pat Tortora | Quality Assurance/Quality Control
T +1 425 563 6500 | E [email protected] www.ghd.com
Downtown Revitalization
Project Engineer
City of Independence | Independence, OR | 2001
Pat led the production of the construction documents
and specifications for the reconstruction of 1,100 feet of South Main Street from B Street to D Street. Work was
completed as part of a historic restoration and included streetscape and urban design. Design included the
replacement of water and stormwater pipelines.
Stormwater design required drainage basin analysis,
downstream system analysis, and hydraulic design of
the piping system.
Main Street/SR 1 Realignment
Lead Civil Engineer
City of Fort Bragg | Fort Bragg, CA | Dec. 2014
Pat served as Project Engineer and worked on the
design for the Main Street Realignment Project (between Oak Street and Pine Street). Improvements included the
relocation of the existing merge/drop lanes; the addition of a bike lane; the addition of medians; the replacement of the existing cobra-head style streetlights with new
decorative streetlights; the addition of right- and
left-hand turn lanes at various intersections; decorative bulbouts, curb ramps, and crosswalks; and accessibility improvements to driveways and sidewalks.
Redwood Business Park Transportation
Improvements
Civil Engineer
City of Ukiah | Ukiah, CA | May 2018 – Feb. 2020
Pat assisted in construction submittal reviews for this project, which involved the reconstruction of an existing roadway system in a developing business park and
retail area of the city. The purpose of the project was to repair a large section of under-designed and failed
pavement, widen and improve roadways to
accommodate increases in traffic and heavy trucks
associated with planned future commercial and retail
developments, and other associated improvements.
Elements of the project include pavement design and
roadway reconstruction for additional heavy truck
traffic, new and modified traffic signals to
accommodate current and future increases in traffic
volumes, the addition of lanes and changes in roadway
geometry to efficiently handle higher volumes of traffic and larger vehicles, extensions of roadways and
utilities to serve new commercial development areas,
and the addition of innovative LID stormwater quality
systems using TDA. The use of TDA in the project
diverted over 35,000 used tires from landfills. The
project was recognized by American Council of
Engineering Companies (ACEC) and ASCE with
numerous awards for client service and design
innovation. Project value: $5.14 million (Final)
Maya Eoff | Civil/Roadway/Drainage Engineering
T +1 707 523 1010 | E [email protected] www.ghd.com
Maya Eoff PE
Civil/Roadway/Drainage Engineering
Location
Santa Rosa, CA
Experience
11 years
Qualifications/Accreditations
– MS, Civil and Environmental Engineering, Colorado State University, Fort Collings, CO, 2010 – BS, Chemical Engineering, Mendeleev University of Technology, Moscow, Russia, 2006 – Civil Engineer, CA #90635
– Occupational Safety and Health Administration (OSHA) 40-Hour Training, 2020 Key technical skills
– Civil3D Design
– Technical Writing
Memberships
– N/A
Relevant experience summary
With over 10 years of experience, Maya Eoff has worked as a project engineer on a variety of projects including transportation, mining, wastewater design, and water quality modelling. She has assisted with the design of several roadway projects in California, including the recent Ukiah Downtown Streetscape Phase II and the Airport Boulevard Rehabilitation for the County of Napa. In addition to her technical skills, she also brings flexibility that she developed while working on complex and dynamic projects, which makes her a reliable teammate. She enjoys learning new skills and pursues excellence in every project.
Transportation
Ukiah Downtown Streetscape Phase II
Design Engineer
Mendocino County | Ukiah, CA
Maya assisted with the preparation of PS&E plans for
35% and 65% submittal using Civil3D. She also
developed striping and signing plans. The project
includes hardscape upgrades and pavement
rehabilitation for Stage II of the downtown improvement.
North and south segments of improvements are
adjacent to the Phase I project also completed by GHD.
Airport Boulevard Rehabilitation
Design Engineer
County of Napa | American Canyon, CA
Maya was responsible for engineering and drafting of
the design for this pavement rehabilitation project in
accordance with geotechnical recommendations,
regulations, and client’s needs. She assisted with the
preparation of the design memo and PS&E submittal.
The project includes approximately 0.5 miles of FullDepth Reclamation (FDR-C) for this four-lane roadway.
The project also includes Americans with Disabilities
(ADA) compliance upgrades to multiple curb ramps and
sidewalks, as well as enhanced pedestrian markings.
The project is adjacent to Caltrans right of way and
includes detailed stage construction and traffic handling plans, as well as a Caltrans encroachment permit.
Long Beach Artesia Great Boulevard
Improvement
Design Engineer
Los Angeles County | Long Beach, CA
Maya designed multiple curb ramps per Long Beach
and Caltrans standards. She assisted with the
preparation of construction details sheet for 90%
submittal to the client and performed QA/QC of the
design. Maya also trained teammates on curb ramp
design incorporating Civil3D tools.
Maya Eoff | Civil/Roadway/Drainage Engineering
T +1 707 523 1010 | E [email protected] www.ghd.com
City of Sonoma 2019 Fire Flow Improvement
Design Engineer
City of Sonoma | Sonoma, CA
Maya was responsible for modelling of existing utilities using record maps and topographical survey. She
prepared the initial design of new fire line
infrastructure in multiple segments of the project using Civil3D. The project includes two segments that
require fire line upsizing and three interties to connect existing fire line zones.
SR 29/SR 221 Roundabout Interchange at
Soscol Junction
Engineer
Napa County | Napa, CA
Maya assisted with the preparation of construction
details sheets for PS&E plans, 65% submittal using
MicroStation. The project includes the design of two
new roundabouts and an overpass at the Soscol
Junction Interchange.
Bell Road at I-80 Interchange
Engineer
Placer County | Auburn, CA
Maya assisted with the preparation of PS&E plans for
65% submittal using Civil3D. The project includes
construction of two roundabouts and exit and entrance
ramps to I-80. The goal is to improve operations,
reduce delay, and enhance mobility for all travel
modes at the interchange.
Hugo Orozco | Civil/Roadway/Drainage Engineering
T +1 707 523 1010 | E [email protected] www.ghd.com
Hugo Orozco EIT
Civil/Roadway/Drainage Engineering
Location
Santa Rosa, CA
Experience
4 years
Qualifications/Accreditations
– BS, Civil Engineering, California State University, Sacramento, CA, 2017 – Engineer-in-Training #164509
– American Concrete Institute (ACI) Laboratory and Field-Testing Technician Grade I Key technical skills
– ADA Compliant Designs
– PS&E Submittal Preparation
– Intersection & Roadway Design
– Utility Conflict Resolution & Design
Memberships
– American Society of Civil Engineers
Relevant experience summary
Hugo Orozco is proficient in AutoCAD Civil 3D and he has participated in site civil development projects by preparing plans for grading and drainage, road design, roadway repairs, roundabouts, street rehabilitation, Americans with Disabilities Act (ADA) compliance, erosion and sediment control, detention ponds, stormwater control, and utility layout. His strong work ethic, positive attitude, and team-oriented approach contribute to solving complex problems.
Town of Paradise Off-System Rehabilitation
Project Engineer
Town of Paradise | Paradise, CA
As Project Engineer, Hugo assisted with the
development of construction documents and estimates
for this rehabilitation project that includes 53 road
segments and over 13 miles of roadway. He also
assisted with the design of numerous ADA curb ramps
and various roadway improvements.
Downtown Cotati Civic Center Connectivity and
Safety Project
Lead Designer
City of Cotati | Cotati, CA
Hugo assisted with comparing cost effective roadway
rehabilitation repairs for multiple street segments with an approximate total length of one mile. This project was
the second part of the original scope that included
pavement rehabilitation, upgrading pedestrian curb
ramps to meet current accessibility standards, traffic
improvements, and upgrades to striping, markings, and
signage.
Windsor River Road/Windsor Road Roundabout
and Multi-Use Path Connector Project
Project Engineer
Town of Windsor | Windsor, CA
Hugo is serving as Project Engineer on this roundabout
project for the Town of Windsor. He assisted with the
production of construction documents, pathway plans,
erosion and sediment control plans, as well as various
other components of the plans and design.
Fulton Road Widening
Project Engineer
City of Santa Rosa | Santa Rosa, CA
Hugo served as Project Engineer, participating in the
production of construction documents. He was
responsible for the design of driveways, curb ramps, and pathways. This project incorporates road widening for
approximately one mile of Fulton Road through partially developed areas utilizing as much existing features and infrastructure as possible and the addition of ADA
compliant sidewalks and pedestrian ramps.
Hugo Orozco | Civil/Roadway/Drainage Engineering
T +1 707 523 1010 | E [email protected] www.ghd.com
City of Cotati 2020 Street Construction and
Improvements
Lead Designer
City of Cotati | Cotati, CA
Hugo developed a technical memorandum, which
included development of alternative roadway
rehabilitation repairs for multiple street segments with an approximate total length of 0.8 miles. The project
included using Full-Depth Reclamation (FDR) as the
method for pavement rehabilitation, upgrading
pedestrian curb ramps to meet current accessibility
standards, parking lot slurry seal improvements, traffic improvements, and upgrades to striping, markings, and
signage.
Jepson Parkway Phase II PS&E
Project Engineer
City of Vacaville | Vacaville, CA
Hugo assisted with the production of the construction
documents including plans and estimates. This project
involves widening a 1.68-mile segment of Leisure Town
Road from two lanes to a four-lane facility.
Fryer Creek Pedestrian and Bicycle Bridge
Lead Designer
City of Sonoma | Sonoma, CA
Hugo assisted with the civil site design layout and
grading of a street and pathway leading up to the
pedestrian and bicycle bridge. The design consisted of
pedestrian curb ramps, driveway, roadway
improvements, and striping upgrades.
Grant Avenue Bridge Rehabilitation Project
Design Engineer
City of Novato | Novato, CA
Hugo assisted with the design improvements that
consisted of a roadway and bridge widening and grading
design for ADA accessible facilities. In addition, he
assisted with various striping, marking, and signage
improvements. The final design allowed for construction of pedestrian and bike improvements on Grant Avenue,
rock slope protection to correct the scour problems with the existing bridge structure, and revegetation of Novato Creek and its banks with native species.
City of Sonoma 2020 Street Rehabilitation
Project
Lead Designer
City of Sonoma | Sonoma, CA
Hugo developed a technical memorandum which
provided alternative roadway rehabilitation repairs for multiple street segments. He produced improvement
plans that included grading design of multiple ADA
compliant pedestrian curb ramps, roadway
improvements, and striping upgrades in conformance
with Caltrans Standard Plans.
City of Sonoma Fire Line Improvement
Staff Engineer
City of Sonoma | Sonoma, CA
Hugo assisted with performing and drafting the
topographic survey for 12 road segments throughout the
city. He gathered record maps to implement existing
utilities from various entities. He also assisted with
developing the utility model and roadway plans.
Sonoma Citywide Slurry Seal
Staff Engineer
City of Sonoma | Sonoma, CA
Hugo assisted with assembling the contract documents
and specifications. He gathered various quantities for
the street and bike path improvements used in the base
of bid. He also referenced Caltrans Specifications and
the CA MUTCD.
Roadway Repair at Old Cazadero Road
Staff Engineer
County of Sonoma | Guerneville, CA
Hugo assisted with the production of 100% plans for this County of Sonoma roadway repair project. He provided
grading for sections of the roadway and improved
various construction details and the erosion and
sediment control plan. He also implemented and
referenced Caltrans details.
Ashley Hoy | Civil/Roadway/Drainage Engineering
T +1 530 242 1700 | E [email protected] www.ghd.com
Ashley Hoy EIT
Civil/Roadway/Drainage Engineering
Location
Redding, CA
Experience
3 years
Qualifications/Accreditations
– BS, Civil Engineering, California State University, Chico, CA, 2018 – Engineer-in-Training, CA #172652
Key technical skills
– Reports, Plans, and Specifications
– Right of Way Acquisition Exhibits, Engineering
Quantity Calculations, Engineering Estimate
Preparation, and Existing and Proposed Watershed
Maps
– Construction Inspection
Memberships
– American Society of Civil Engineers
Relevant experience summary
Ashley Hoy joined GHD in the winter of 2017 as an intern, progressing to a design engineer after graduating in 2018 from California State University Chico. She provides technical assistance and project design on various civil engineering and transportation projects. She prepares reports, plans and specifications including the development of right of way acquisition exhibits, engineering quantity calculations, engineering estimate preparation, and existing and proposed watershed maps. Ashley also has provided construction inspection for seal coat projects and oversaw the contractor’s daily operations, materials testing, plans interpretation, and contractor payment records. In addition, she utilizes her past experiences in construction to develop practical designs for grading, preliminary traffic analysis, quantity cost estimating, and utility mapping.
Shasta Lake Citywide Highway Safety
Improvement Program (HSIP) Guard Rail
Upgrades
Design Engineer
City of Shasta Lake | Shasta Lake, CA
Ashley provided QC, reviewing technical specifications, construction bid estimate, and civil plans.
Canyon Road Bridge Replacement at AndersonCottonwood Irrigation District (ACID) Canal Design Engineer
Morrison Structures Inc. | Redding, CA | $600,000
(Construction)
Ashley prepared the preliminary designs for the Canyon
Road over the ACID Canal replacement projects. The
project was successfully constructed with Highway
Bridge Program (HBP) federal funding with a
construction cost of $600,000.
Central Business District Pedestrian
Improvements
Design Engineer
City of Alturas | Alturas, CA | $750,000
(Construction) | 2019
Ashley designed the sidewalk and American with
Disabilities Act (ADA) improvements in Downtown
Alturas.
Laurel Avenue Reconstruction
Assistant Construction Office Engineer
Sutter County | Sutter County, CA | $400,000
(Construction) | 2019
Ashley provided in-office construction support for 0.7
miles of full depth reconstruction of rural roadway. The project was successfully constructed in 2019 at a
construction cost of approximately $400,000.
Ashley Hoy | Civil/Roadway/Drainage Engineering
T +1 530 242 1700 | E [email protected] www.ghd.com
Redding Downtown Streets through the
Promenade Plans, Specifications, and Estimate
(PS&E)
Assistant Construction Office Engineer
City of Redding | Redding, CA | $9 million
(Construction)
Ashley assisted with labor compliance review for the
construction of streets through three downtown blocks.
Project was constructed at an approximate cost of $9
million.
I-5 / South Bonnyview Road Interchange (Phase
2) Improvements
Design Engineer
City of Redding | Redding, CA | $10 million
(Construction) | 2022
Ashley prepared PS&E for freeway interchange
modifications consisting of traffic signal modifications, drainage improvements, a new retaining wall, and
reconstructed off-ramps. She provided preliminary
stormwater data report with pre and post watershed
exhibits, and preliminary design exception fact sheet and corresponding exhibits. Construction is scheduled for
2021-2022, at a construction cost of approximately $10
million.
SR 299/Churn Creek Road/Hawley Road
Interchange
Design Engineer
Bethel Church | Redding, CA | $6 million
(Construction)
Ashley prepared PS&E for a major interchange project
that will include two modern roundabouts. Design
elements included bicycle and pedestrian facilities,
landscape features, stormwater treatment facilities,
storm drain systems, and utility relocations.
I-5 / South Bonnyview Road Interchange (Phase
1) Improvements
Design Engineer
California Gold Development Corporation | Redding,
CA | $2.5 million (Construction) | 2020
Ashley provided PS&E QC for freeway interchange
modifications consisting of traffic signal modifications, drainage improvements, a new retaining wall and a
longer/wider northbound on-ramp. The project was
successfully constructed in 2020 with a construction cost of approximately $2.5 million.
SR 99 / Fulkerth Road Interchange
Reconstruction PSR, PA/ED, and PS&E
Design Engineer
City of Turlock | Turlock, CA | $11.5 million
(Construction) | 2018
Ashley provided the engineering quantity calculations
and engineering estimate preparation. The project was
successfully delivered to construction in 2018 with a
construction cost of $11.5 million.
Pedestrian Countdown Signal Heads and
Pavement Markings
Design Engineer
City of Orland | Orland, CA
Ashley assisted with the preparation of PS&E for
modifications to update existing traffic signals with
pedestrian countdown signal heads, new pavement
delineation, and accessible push button assemblies.
SR 299/Old Oregon Trail Interchange
Design Engineer
Bethel Church | Redding, CA
Ashley developed PS&E, utility pothole mapping, and
pavement delineation coordination with Shasta County
Active Transportation Program (ATP) project.
Construction is tentatively scheduled for 2022.
Other Related Areas of Interests
Volunteering & Leadership
– Improving and rebuilding Caper Acres Children’s Park
– American Society of Civil Engineers MidPac Concrete
Canoe Competitor, 2016, 2018
– American Society of Civil Engineers MidPac Concrete
Canoe Coordinator, 2017
Software Applications
– Civil 3D
– AGTEK
– Revu BlueBeam
Richard Maddock | LiDAR, Utility & Boundary Survey
T +1 707 523 1010 | E [email protected] www.ghd.com Richard Maddock PLS
LiDAR and Topographic Survey
Location
Santa Rosa, CA
Experience
30 years
Qualifications/Accreditations
– General Courses, Land Surveying and Business Management, Solano Community College, Fairfield, CA, 1985-1989
– Professional Land Surveyor, CA #8131
Key technical skills
– Land surveying
Memberships
– N/A
Relevant experience summary
Richard Maddock is a California-registered professional land surveyor. He has over 30 years of experience in all aspects of land surveying. He is an experienced party chief working on projects varying from winery construction staking to subdivisions. With the budget and timeline in mind, Richard delivers a superior product for the client. In the field, he will be the Party Chief of the primary survey crew. Being the Party Chief will provide him with first-hand knowledge of the site, the condition of the existing monuments and other important information critical to producing an accurate survey performance area.
Stony Point Road Reconstruction and
Widening (Phase 2)
Land Surveyor
City of Santa Rosa | Santa Rosa, CA
The project included the design of traffic signal
modifications and new traffic signal system designs at
six locations for preparation of construction Plans,
Specifications, and Estimate (PS&E). It included one
new complete traffic signal system, two new Rectangular Rapid Flashing Beacon (RRFB) installations mid-block
pedestrian crossings, and modification of three existing traffic signal systems due to roadway widening and
upgrades for ADA compliance. The Stony Point corridor
utilizes 2070 traffic controllers with Sydney Coordinated Adaptive Traffic System (SCATS) traffic system
programming. Mid-block pedestrian crossings were
designed with pedestrian refuge islands for compliance
with the California Manual on Uniform Traffic Control
Devices. Other design items included use of City
standard video detection for limit line and intermediate detection and other provisions designed to meet the City Traffic Standards.
Millbrae Avenue Box Culvert Repair
Land Surveyor
City of Millbrae | Millbrae, CA
This project included 725 linear feet of 48-inch
Reinforced Concrete Pipe (RCP) and radial elliptical
concrete pipe, manholes, 12-inch RCP laterals, and
discharge into the existing creek. The survey included
streets, creeks, and a large open space (Spur Trail
greenway) as part of alternatives analysis for rerouting an existing box culvert from underneath private
properties to either a pipe routed below grade through
streets, or as a creek daylighting project through the
Spur Trail. The park survey included numerous trees
and surface features, discharge areas into existing
creeks at multiple points. The street survey included all surface features including curbs, manholes, pipe invert elevations, catch basins, and valves.
Napa Road Rehabilitation Project
(STPL-5114(017)
Land Surveyor
City of Sonoma | Sonoma, CA
This was a federally funded project, the limits of which included approximately 2,700 linear feet of Napa Road,
an arterial roadway within the City. The project
www.ghd.com
Richard Maddock | LiDAR and Topographic Survey
rehabilitated the existing pavement section,
reconstructed pedestrian curb ramps for ADA
compliance and reconfigured the roadway for Class II
bike lanes or shared lanes throughout the project limits.
GHD provided full federal aid services to the project,
including Caltrans Local Assistance coordination, field review, Preliminary Environmental Screening (PES),
National Environmental Policy Act (NEPA) technical
studies, utility work, right of way certification, and
preparation of federal authorization for construction.
One Bay Area Grant Project: 5039 (023) Safe
Routes to School, Phase 2
Land Surveyor
City of Cloverdale | Cloverdale, CA
This was a federally funded project that included
pedestrian pathway and sidewalk gap closures, ADA
curb ramps, restriping for Class II bike lanes, including green markings. The project included preparation of
legal plats and descriptions for new sidewalk easements for the project, coordinating with the City’s right-of-way agent for acquisition of real property rights and
assistance with the right-of-way certification for the
project. In addition, GHD prepared the NEPA technical
studies for the project for the project NEPA document
and prepared the request for authorization and PS&E
submittal for construction spending authorization.
Petaluma Complete Streets Project
(STPL 5022(055)
Land Surveyor
City of Petaluma | Petaluma, CA
This was a federally funded project, which limits included approximately 4,500 linear feet of Lakeville Street and East D Street, two heavily traveled arterials within the city. The project rehabilitated the existing pavement
section, reconstructed pedestrian curb ramps for ADA
compliance, provided high visibility cross walks and/or RRFBs at pedestrian crossings, and incorporated Class
II bike lines or shared lanes throughout the project limits.
Eastside Trunk Sewer Phase 2
Land Surveyor
City of Rohnert Park | Rohnert Park, CA
Richard served as Land Surveyor for the completion of
the design documents for $10-million, 10,000-linear foot, 18- and 24-inch diameter Polyvinyl Chloride (PVC)
sanitary sewer main project.
T +1 707 523 1010 | E [email protected]
North Marin Water District Recycled Water
Expansion
Project Manager, Land Surveyor
North Marin Water District | Marin County, CA
Richard served as Land Surveyor and Project Manager
for surveying, right-of-way mapping, and field survey of the alignment to expand the North Service Area of their Recycled Water project.
City of Rohnert Park Sewer Interceptor/Outfall
Land Surveyor
City of Rohnert Park | Rohnert Park, CA
Richard served as Land Surveyor for the predesign and
design for this 3.5-mile, 27-inch diameter, High Density Polyethylene (HDPE) sewer force main. The pipeline is
aligned through habitat areas for the California Tiger
Salamander and vernal pool areas. This $8.5-million
pipeline was constructed on a fast-track schedule and
was just operational when the City experienced a
100-year storm event, avoiding potentially significant
Sanitary Sewer Overflows (SSO’s).
Napa River Park
Land Surveyor
City of Napa | Napa, CA
Richard provided survey for this project using Lieca
Global Positioning System (GPS) and Lieca 1203 Total
Station to map the upland and river bottom for design
and pre-dredge earthwork calculations. Richard
produced all in compassing map of the uplands and
waterways including utilities and structures along top of bank for slope analysis.
Felix Creek Fish Passage and Dam Repair /
Removal
Land Surveyor
The Land Conservancy | Hopland, CA
Richard provided survey for this project using Leica GPS and Leica 1203 Total Station to provide topographical
mapping for design of fish passage channel
improvements. He provided a detailed topographic map
verifying culvert design for hydraulic analysis.
San Anselmo Culvert Fish Passage Project
Land Surveyor
County of Marin | Marin County, CA
Richard provided survey for this project using Leica GPS and Leica 1203 Total Station to provide topographical
mapping for design of fish passage channel
improvements. The detail topographic map verified
culvert design for hydraulic analysis.
John Hanser | LiDAR, Utility & Boundary Surveying
T 1 916 372 6606 | E [email protected] www.ghd.com
John Hanser PLS
LiDAR and Topographic Surveying
Location
Sacramento, CA
Experience
25 years
Qualifications/Accreditations
– AS, Survey / Mapping, Sierra College, Rocklin, CA, 1996 – Professional Land Surveyor, CA #9578
– HazMat Certified
Key technical skills
-Attention to detail and methodical approach to
work safety
Memberships
– California Land Surveyors Association
Relevant experience summary
John Hanser has over 25 years of land surveying experience with a thorough knowledge of the principles, practice, and procedures of topographic, boundary, aerial, American Land Title Association (ALTA), and construction surveys on a broad range of projects including road/highway transportation, water conveyance, hydroelectric, industrial, commercial, subdivision, and residential projects for public and private clients. He has performed construction staking for rough and finished grades for alignment and grade, buildings, walls, parking areas, driveways, roads, curb and gutter, joint trench and crossings, lift stations, sewer, water, storm drain, and fire hydrants, as well as slope staking and mass grade staking. John is also experienced with the protocol and reporting rigor required for federal and state permitted projects (e.g., Federal Energy Regulatory Commission (FERC), Federal Emergency Management Agency (FEMA), and Division of the State Architect (DSA)). He is wellexperienced in coordinating with public agencies; complying with their stringent requirements and established cost limitations; and ensuring deliverables meet all applicable codes, standards, regulations, laws, and licensing requirements. John is highly experienced in utilizing incoming survey data to produce a wide variety of maps including tentative and final maps, subdivision maps, parcel maps, boundary line adjustment maps, lot line adjustment maps, and ALTA survey maps. John is proficient with a broad spectrum of conventional survey equipment; data collection techniques include using Real-Time Kinematic (RTK), Global Positioning System (GPS), LiDAR, and 3D Laser Scans. He is competent with current software including AutoCad LDD, Trimble Terramodel, Trimble Business Center, and Microsoft Office Suite.
Sacramento Municipal Utility District Upper
American River Project Roadway Improvement
Project - FERC Project No. 2101
Staff Land Surveyor
Doug Veerkamp General Engineering | El Dorado
County, CA
John served as Staff Land Surveyor for this roadway
improvement project, part of the Upper American River
Project owned and operated by the Sacramento
Municipal Utility District. He provided accurate data
collection during fieldwork and drafted all data into a topographic survey to support the analysis for
approximately 6.5 miles of roadway owned and/or
managed by the United States Forest Service (USFS) in
the Crystal Basin Recreation Area in the vicinity of Union Valley and Ice House Reservoirs. During construction,
John provided staking calculations and performed
construction staking for the replacement of roadway
pavement, gates, roadside barriers, native access trails, and other elements for a complete roadway
improvement in accordance with USFS, Federal
Highway Administration standards, and FERC License
condition requirements.
Prado Road/Elks Lane Intersection Analysis
Staff Land Surveyor
City of San Luis Obispo | San Luis Obispo, CA
John was responsible for accurate data collection during field survey, as well as for drafting all data into a
www.ghd.com
John Hanser | LiDAR and Topographic Surveying
topographic survey to support the analysis of the
intersection of Prado Road and Elks Lane for the
planning of future improvements for multimodal safety.
Firehouse Canyon Road
Staff Land Surveyor
San Luis Bay Estates Homeowners Association |
San Luis Obispo, CA
John was responsible for accurate data collection during fieldwork and for providing the needed expertise in the office to map the incoming survey data collected and
produce a topographic survey map to support the
investigation of a keystone retaining wall
Eubanks Drive Construction Staking
Staff Land Surveyor
Buzz Oates Construction | Vacaville, CA
John served as Staff Land Surveyor for this
commercial/industrial development project. Work
included office calculations and construction staking
during construction of a 263,400-square-foot building.
Staking including building grid layout, rough grade and finish grade, hardscape surfaces, drainage basin, and
underground utilities.
American Canyon Project
Staff Land Surveyor
Buzz Oates Construction | Napa County, CA
John was responsible for recovering existing survey
control, re-publishing coordinate values for control
network, performing office calculations for construction staking as well as assisting in the fieldwork during
construction staking activities. Construction staking
included locating waterlines, a storm drain, streetlights, a driveway entrance, and the wing walls for loading docks.
John also created mapping for the bio retention pond.
Flume 44 Replacement - FERC Project No. 184
Staff Land Surveyor
El Dorado Irrigation District | El Dorado County, CA
John served as Staff Land Surveyor for this flume
replacement project, a key element of the 22-mile-long
El Dorado Canal. He provided accurate data collection
during fieldwork, which consisted of locating and
identifying trees on the project site and added to the
topographic map. During construction, John provided
staking calculations and performed construction staking for flume replacement and related support structures.
El Dorado Penstock Stabilization - FERC
Staff Land Surveyor
El Dorado Irrigation District | Pollock Pines, CA
John was responsible for accurate data collection during fieldwork and for providing the needed expertise in the T 1 916 372 6606 | E [email protected]
office to map the incoming survey data collected during the field surveys and produce a detailed master drawing to facilitate the engineering design of access
improvements. The base map was prepared using a
combination of existing LiDAR data, conventional
survey, and aerial photography. Work included
identification of key features on the site such as the rock surface under the switchyard, concrete pillars, footings, penstocks, existing ladders, and any other points of
interest beneficial to the design team. The greatest
challenge was the extreme topography of the site.
Letter Flume Replacement - FERC
Staff Land Surveyor
El Dorado Irrigation District | El Dorado County, CA
John served as Staff Land Surveyor for this flume
replacement project, a key element of the four sections of wooden flume replacement on the El Dorado Canal.
He provided accurate data collection during fieldwork,
which consisted of locating and identifying trees on the project site and added to the topographic map to verify LIDAR provided by the water district. He combined all
data into a topographic survey to provide information
needed for to support the engineering design.
Woodridge Court Waterline
Staff Land Surveyor
El Dorado Irrigation District | Placerville, CA
John was responsible for accurate data collection during fieldwork and for providing the needed expertise in the office to map the incoming survey data collected to
locate water valves, meters, and sewer appurtenances
on two residential courts. Work also included mapping
the topographic contours from a combination of survey
points and existing LiDAR data.
Additional Training
– 40-Hour Hazardous Waste Operations and
Emergency Response (HAZWOPER) Initial Training
(Title 8CCR 5192(e)(3)(A) & CFR 1910.120(e), 2019,
2021.
– PG&E Safety Training, 2019
– California Survey & Drafting Services (CSDS) Trimble
Business Center 3.61, 2016
– California Land Surveyor Association (CLSA) LS
Review, 3-Day Seminar, 2010, 2008, 2015
– CLSA LS Review, 5-Day Seminar, 2019
– CSDS GPS Training, 2004
– Federal Aviation Administration (FAA) Remote
Certifcation-2020
T 1 707 443 8326 | E [email protected] www.ghd.com Harrison Hummel B.A.
LiDAR and Topographic Surveying
Location
Eureka, California
Experience
11 years
Qualifications/Accreditations
– Bachelor of Art in Geography, Anticipated Spring 2022 – GIS Certificate, 2015
Key technical skills
– ESRI ArcGIS/ArcGIS Pro
– Unmanned Aircraft Systems Planning and Operations
– ArcGIS Online
– Photogrammetry Processing
– AutoCAD/Civil3D
– LiDAR Data Processing
Memberships
– North Coast GIS Users Group
Certifications and Training
– FAA Certified Remote Pilot 2018, Renewal 2020
Relevant experience summary
Harrison Hummel has extensive experience following industry standards and best practices for collection, management, and analysis of GIS spatial data. He can create meaningful and accurate maps and reports that enable clients to visually interpret complex spatial questions for a wide variety of different projects. As a Part 107 UAV Pilot, he carries a primary focus on producing survey grade deliverables and botanical mapping products that can aid in mitigation planning and monitoring. Harrison strives to provide simple solutions for complex problems by utilizing advanced geospatial technologies.
Project experience
Guam Routes 1 and 3 Under Pavement
Infrastructure Retrofit - Mobile LiDAR Scan
LiDAR Specialist/Data Processing
Guam | Guam | November 2021 – Present
GHD used a mobile LiDAR scanner with a 360-degree
camera to collect data along a 15-kilometer corridor on the island of Guam. Inertial Explorer was used to post
process and maximize the performance of the GNSS/INS
hardware to ensure position, velocity, and attitude
accuracy of the collected LiDAR data. ScanLook Point
Cloud was used to process the law LiDAR into a point
cloud for further data analysis and extraction. Topography and other important features were extracted from the
point cloud using advanced CAD and GIS software. The
360-degree imagery was used to generate an interactive
map showing street view images of the project area to
assist in asset identification and surface extrapolation.
Tehama County Highway 99 Mobile/UAV
LiDAR Scan
LiDAR Specialist, Data Processing, and UAV Pilot
County of Tehama | Tehama County, California
October 2021
GHD used a mobile and UAV based LiDAR scanner to
collect data along 8 miles of roadway in rural Tehama
County. Inertial Explorer was used to post process and
maximize the performance of the GNSS/INS hardware
to ensure position, velocity, and attitude accuracy of the collected LiDAR data. ScanLook Point Cloud was used
to process the law LiDAR into a point cloud for further data analysis and extraction. Topography and other
important features were extracted from the point cloud
using advanced CAD and GIS software.
Contaminated Lands Assessment
LiDAR Specialist and Data Processing
Phillips 66 | Duncan, Oklahoma
April 2017 – Present
T 1 707 443 8326 | E [email protected] www.ghd.com Harrison Hummel | LiDAR and Topographic Surveying
GHD manages a 600-acre contaminated site at a
decommissioned refinery. Harrison processed raw
LiDAR data into a Point Cloud. Data was imported into
TopoDOT to extrapolate and extract topographic data for use in further design in AutoCAD Civil 3D.
Mendocino Roadway Mobile LiDAR Scan
LiDAR Specialist and Data Processing
City of Mendocino | Mendocino, CA
July 2021 – Present
GHD used a mobile LiDAR scanner with a 360-degree
camera to collect data along a ten-mile corridor in the town of Mendocino. Inertial Explorer was used to post
process and maximize the performance of the GNSS/INS
hardware to ensure position, velocity, and attitude
accuracy of the collected LiDAR data. ScanLook Point
Cloud was used to process the law LiDAR into a point
cloud for further data analysis and extraction. Topography and other important features were extracted from the
point cloud using advanced CAD and GIS software. The
360-degree imagery was used to generate panoramic
street view images of the project area to assist in asset identification and surface extrapolation.
Metamora Water Main Expansion Survey
LiDAR Specialist and Data Processing
Metamora | Township of Metamora, MI
July 2021 – Present
GHD collected data using a UAV based LiDAR sensor to
capture high precision topographic data. Inertial Explorer was used to post process and maximize the accuracy of
the on board GNSS/INS hardware to ensure position,
velocity, and attitude of the LiDAR data. Once corrected, a point cloud was generated using ScanLook Point Cloud
where a dense data rich point cloud was produced. The
point cloud was imported into TopoDOT to filter heavily vegetated areas to produce an accurate topographic
surface for use in further design in AutoCAD Civil3D.
Halton Lanfill Inspection Study
LiDAR Specialist/ Data Processing
Regional Municipality of Halton | Mississauga,
Ontario, Canada | July 2021 – Present
GHD collected data using a UAV based LiDAR sensor
to capture high precision topographic data of a closed
landfill. Inertial Explorer was used to post process and maximize the accuracy of the on board GNSS/INS
hardware to ensure position, velocity, and attitude of
the LiDAR data. Once corrected, a point cloud was
generated using ScanLook Point Cloud where a dense
data rich point cloud was produced. The point cloud
was imported into TopoDOT to filter heavily vegetated
areas to produce an accurate topographic surface. The
dense surface was used to calculate volume and
settlements of the closed landfill.
Watershed Delineation, Dark Gluch
GIS Technician
Mendocino County | Mendocino County, CA | 2019
Harrison was responsible for elevation analysis from a LIDAR data set in which the total area of the watershed was
determined. A detailed hillshade and contours was produced from the raw LIDAR data.
Siskiyou County Landfill Assessment
UAV Pilot and GIS Technician |
Siskiyou County | Siskiyou County, CA | 2018
Harrison was responsible for surveying multiple active
and closed landfills within Siskiyou County. A UAV was
used to collect high resolution aerial imagery of the
project sites to capture the current conditions of the
landfills. Data was processed in photogrammetry software where a Digital Elevation Model and an orthomosiac was
generated. Data was analyzed inside advanced GIS
software to study ground settlement and subsidence.
Bakers Meadowfoam Mapping
UAV Pilot and GIS Technician |
Caltrans | Willits, CA | June 2017 – 2020
Harrison was responsible for mapping the extent of Bakers Meadowfoam within mitigation areas for the Caltrans Willits Bypass project. He was tasked with flying 2,000 acres and mapping the extent and change of Bakers Meadowfoam in a five-year period. Red, Green, and Blue (RGB) and multi-spectral sensors were used to acquire high-resolution aerial imagery of the project area. The imagery was then processed in Pix4D Photogrammetric software to create an ortho-mosaic. ArcGIS was used to analyze the ortho-mosaic datasets to map out the extent of the Bakers Meadowfoam. A combination of heads up digitizing and image classification tools using ArcMap was used to map and calculate density within the Willits’ valley.
Gravel Bar Extraction Surveys & Monitoring
UAV Pilot and GIS Technician|
Randall Sand and Gravel | Garberville, CA |
| June 2020
Harrison was responsible for mapping pre- and post-extraction conditions in the Mad River. A UAV was used to acquire highresolution aerial images of the project and extraction areas.
Ortho-mosaics and Digital Elevation Models (DEM’s) were generated from the aerial imagery in Pix4D. The DEM was imported into Virtual Surveyor where vegetation was removed, and a high-resolution Triangular Irregular Networks (TIN) was generated for export into AutoCAD. AutoCAD was used to
grade a designed extraction surface and an estimated volume was calculated. After gravel extraction, post extraction conditions were recorded using the UAV, as well as on the ground surveying. This data was once again brought into AutoCAD where a final volume was calculated by comparing the pre- and post-extraction surfaces. Traditionally, this type of monitoring and calculation was accomplished with the use of traditional survey methods. The UAV decreased the amount of field effort necessary and resulted in a higher resolution dataset than traditional methods.
Jeremy Svehla | Hydaulic Engineering
T +1 707 443 8326 | E [email protected] www.ghd.com Jeremy Svehla PE, QSD/QSP
Hydaulic Engineering
Location
Eureka, CA
Experience
17 years
Qualifications/Accreditations
– BS, Environmental Resources Engineering, Humboldt State University, Arcata, CA, 2003 – Civil Engineer, CA #72169, OR #84314
– Qualified Stormwater Pollution Prevention Plan (SWPPP) Developer/Practitioner #00159 Key technical skills
– Hydrology, Hydraulics and Geomorphology
– Coastal Resiliency
– Habitat Restoration Design
– Flood Management and Sea Level Rise Adaptation
– CEQA, NEPA, and Permitting
– Granting Writing
– Construction Management
Memberships
– American Society of Civil Engineers (ASCE), North
Coast Branch, Past Director
– American Fisheries Society (AFS)
– City of Arcata, Wetlands and Creek Committee, 2014
- Present
– Humboldt State University Environmental Resources
Engineering Department, ABET Accreditation
Advisory Committee, 2010 - Present
Relevant experience summary
Jeremy Svehla is a professional engineer with over 17 years of experience in water resources and coastal engineering, encompassing a broad range of engineering design, project management, and construction management. This has involved managing the Eel River Restoration Program comprised of the Salt River Ecosystem Restoration Project involving restoration of the lower 7.7-mile reach of the Salt River corridor and 450 acres of tidal salt marsh. He is also managing restoration of the lower 2.5-mile reach of Centerville Slough, 150 acres of tidal salt marsh, and 15 acres of coastal dunes in the Eel River Estuary. His skills range from grant writing, geomorphic assessments, and shoreline assessments to 2D hydrodynamic modeling, riverine and estuarine habitat restoration design, and sea level rise adaptation planning. He has served as project manager or project engineer for restoration projects and habitat improvement/enhancements for the majority of our team’s high-profile restoration experience, including for CalTrout, the Wildlands Conservancy, California Water Service Company, Alameda County Water District, Santa Clara Valley Transportation Agency, and the City of Fortuna. As a testament to the quality of his service, Jeremy was named the ASCE San Francisco Section North Coast Branch “Engineer of the Year” in 2015.
Gobbi Street Intersection Bridge and Culvert
Replacement Project
Project Engineer
City of Ukiah | Ukiah, CA
Jeremy served as Project Engineer responsible for
developing the hydrology and hydraulic design including the FEMA no-net-rise certificate and construction
documents. The project’s goal was a design to improve
pedestrian access and intersection geometry at the
intersection. The project included geotechnical
investigations, survey, hydrology, and hydraulic
evaluation of new stream crossings on Gibson Creek
including evaluation of new improvements in relation to existing FEMA FIRM hydraulic models. The bridge
design needed to incorporate fish passage as Gibson
Creek is a known salmonid habitat.
City of Ukiah Storm Drainage Study
Project Engineer
City of Ukiah | Ukiah, CA
Jeremy served as Project Engineer for this project which included a hydrologic and hydraulic investigation of
flood-prone areas within the City of Ukiah. The primary objective of the study was to analyze the existing storm
Jeremy Svehla | Hydaulic Engineering
T +1 707 443 8326 | E [email protected] www.ghd.com drainage facilities and determine deficiencies that have been attributed to the localized flooding. Jeremy’s
involvement included performing field investigation,
hydrologic and hydraulic analyses, and alternative
analysis of conceptual designs. He performed hydraulic
modeling using StormCAD.
Hanson Russian River Floodplain Restoration
Project Manager
Sonoma County | Near Windsor, CA
Jeremy serves as Project Manager for this ongoing
project to restore 350 acres of former gravel pit mines to a riparian floodplain on the Russian River near the Town of Windsor. The work involves riverine hydraulic
analyses, groundwater assessments to support final
design (assessing the hydraulic and fate-transport of
accumulated methylmercury at the bottom of the mine
pits), CEQA and regulatory approvals, and 3 million
cubic yards of earthwork to re-contour and re-connect
the floodplain to the river. The project will improve
geomorphic stream function, increasing riparian buffers and habitat diversity for avian and aquatic listed species while reducing further accumulation of methyl mercury
and flood reduction. Jeremy led the project team through initial data collection, hydrogeologic and geotechnical studies, and preliminary design to support regulatory
approvals. The project is funded by the California
Coastal Conservancy and the CDFW.
Rohner Creek Flood Control and Habitat
Improvement Project
Project Manager
City of Fortuna | Fortuna, CA
Jeremy served as Project Manager for this $8-million
urban stream restoration project through Fortuna’s
downtown district. Project objectives included removal of salmonid migration barriers, improvements to
geomorphic stream function and reduced flooding. His
responsibilities included leading the project team
through grant development, streamflow monitoring,
hydrologic/hydraulic modelling, preliminary design,
environmental review, final design, and construction
management for this multi-phase project. FEMA has
approved the Conditional Letter of Map Revision
(CLOMR) and once completed the project will remove
approximately 150 properties from the FEMA regulated
100-year flood hazard zone.
Redwood Road Erosion Repair Project
Project Engineer
City of Napa | Napa, CA
Jeremy served as Project Engineer for this storm
damage repair project which required streambank
stabilization along Redwood Creek and roadway
reconstruction of Redwood Road at two sites within the
City of Napa. The project involved the assessment of
soft bioengineering and hard armoring streambank
stabilization measures, hydrologic analysis to determine design peak flows, an open-channel hydraulic analysis
through both project sites utilizing the HEC-RAS model, geotechnical investigation, and structural analyses. Final design featured bioengineered streambank revetment
including rock slope toe protection, live willow planting, and soldier pile wall with concrete lagging.
Caspar Creek Fish Passage Improvement
Project
Project Engineer
Five Counties Salmonid Conservation Program |
Mendocino County, CA
Jeremy served as Project Engineer for ongoing project
funded by the California Coastal Conservancy and
administered by the Trinity County Planning Department
for the Five Counties Salmonid Conservation Program.
The Jackson Demonstration State Forest is an important
experimental forest that serves as an important research asset in studying forest management practices and the
forest sciences in general. Both the north and south
forks of Caspar Creek have sediment/debris stilling
controlled by concrete low-flow V-notch weirs, which are used for measuring streamflow by Redwood Sciences
Laboratory. Jeremy’s involvement on the project
included working in a project team and completed tasks
associated with initial design development, and
preparation of plans and cost estimates.
Awards
– Homer Arnold Award for Lower Van Duzen River
Streambank Restoration and Fish Passage
Improvement Project
– ASCE San Francisco Section North Coast Branch
Engineer of the Year, 2015
Steve Burns | Structural Engineer
T 707.303.4855 | E [email protected] www.ghd.com
Steve Burns PE, SE, ME, LEED AP
Structural Engineer
Location
Santa Rosa, CA
Experience
30 years
Qualifications/Accreditations
– MS, Structural Engineering, University of California, Berkeley, CA, 1991 – BS, Engineering, San Francisco State University, San Francisco, CA, 1980 – Civil Engineer, CA #51369
– Structural Engineer, CA #4229
– Mechanical Engineer, CA #26600
– Leadership in Energy and Environmental Design Accredited Professional (LEED AP), US Green Building Council – Construction Documents Technologist (CSI)
Key technical skills
– Structural engineering for roadway and trails projects – Bridges, box culverts, retaining walls
Memberships
– Structural Engineers Association of Northern
California
Relevant experience summary
Steve Burns is a professional engineer with over 30 years of experience in the design and analysis of building, civil, and bridge structures. Steve has extensive experience with both new construction and repair/retrofit. In the building industry, he has performed new building design, as well as seismic retrofit for concrete, steel, masonry, and wood structures.
Stony Point Road Widening
Senior Structural Engineer
City of Santa Rosa | Santa Rosa, CA
As Senior Structural Engineer, modified an existing box culvert on Stony Point Road at Roseland Creek, Santa
Rosa, California. Modifications included the inclusion of a new box culvert running parallel and adjacent to the
existing, extension of the existing culvert to assist in road widening, wing wall design and miscellaneous
retaining wall design. Modifications were made in
accordance with the AASHTO LRFD bridge design
specifications, sixth edition, with California amendments and Caltrans standard details.
Snyder Lane Widening
Senior Structural Engineer
City of Rohnert Park | Rohnert Park, CA
As Senior Structural Engineer, designed an extension to an existing multi cell box culvert on Snyder Lane at
Copeland Creek, Rohnert Park, California. Extension
included retrofit of the existing concrete bridge vehicle barrier on the non-extended side to match the new
concrete vehicle barrier on the extended side and design of wing walls. Modifications were made in accordance
with the AASHTO LRFD bridge design specifications,
sixth edition, with California amendments and Caltrans
standard details.
Coyote Creek Trail – Brokaw Road to Union
Pacific Railroad
Senior Structural Engineer
City of San Jose | San Jose, CA
As Senior Structural Engineer, provided design of the
structural features of this approximately one-quartermile-long multipurpose trail, which included retaining walls, guard rails and trail canopy structures. The trail is 12 feet wide and composed of asphalt concrete
pavement with two-foot-wide compacted virgin base rock
shoulders. The majority of the trail is on top of the
existing levee or creek bank. A unique feature of the trail is that it passes beneath an existing railroad trestle. This necessitated the design of a canopy to protect trail users from falling debris that may be caused by a passing
train. The canopy design was composed of steel
Steve Burns | Structural Engineer
T 707.303.4855 | E [email protected] www.ghd.com
incorporating a metal deck and tube steel structure,
which included access hatches so that the train trestle could be inspected from below on top of the canopy.
Additionally, the canopy was supported from one side of the trail only so it would not interfere with the view. Steve also designed conventional cast-in-place concrete
retaining walls to support earth cut sections along the trail way.
Lucas Valley Road Realignment
Senior Structural Engineer
County of Marin | Marin County, CA
Steve is serving as Senior Structural Engineer for this federally-funded project. Project components include
constructing a CIDH soldier pile retaining wall with tie backs to correct a known slide around a tight radius
curve and increasing the radius to improve safety.
Windsor River Road Pavement Repair
Senior Structural Engineer
City of Windsor | Windsor, CA
As Senior Structural Engineer, designed a retaining wall to support a portion of Windsor River Road that was
sloughing away, Windsor, California. Repair consisted of the design of a solder pile retaining wall. Soldier piles were made from HP12x53 wide flange elements
cantilevering from cast-in-drilled hole concrete piers.
Lagging was composed of precast reinforced beam
elements. Design was performed in accordance with the
2013 California Building Code.
Redwood Road Erosion Repairs
Senior Structural Engineer
City of Napa | Napa, CA
As Senior Structural Engineer, Steve designed two
retaining walls for active erosion sites along the bank of Redwood Creek in an area that threatened the stability
of Redwood Road, which is classified by the City of
Napa as an arterial roadway. Design challenges
included protection and retention of a large oak tree with exposed roots, channel scour, and site access.
Healdsburg Roundabout
Senior Structural Engineer
City of Healdsburg | Healdsburg, CA
As Senior Structural Engineer, designed retaining walls and culvert replacements for the City of Healdsburg, CA.
The culvert measured 104-feet in length by 10-feet in
width by 14-feet in depth and extended under a
roundabout. The retaining walls measured 56-feet in
length and retained up to 12.5-feet of retained earth on both sides of a creek after exiting from the afore
mentioned culvert. All structures were cast-in-place
concrete designed in accordance with the 2013
California Building Code. Connections of the culvert to an existing culvert and various light pole foundation were also designed.
SYAR Industries Truck and Rail Crossover at
Stoney Creek
Senior Structural Engineer
SYAR Industries | Glen County, CA
As Senior Structural Engineer, designed a crossover to
support both truck and rail loads over an existing culvert at Stoney Creek in Glen County. Construction consisted
of a reinforced concrete bridge structure to span over
the existing culvert. Design documents included all plans and specifications for the work. The rail line consisted of a rail spur that supports Cooper E80 loads. The truck
pathway was designed to support AASHTO HS20-44
loads. The rail line is under the jurisdiction of California Northern Railroad, and therefore, the design was in
accordance with California Northern Standards.
Soda Creek Culvert Crossing
Senior Structural Engineer
Napa County Department of Public Works | Napa, CA
As Senior Structural Engineer, reviewed an existing
structural capacity report and made an independent
evaluation with findings and recommendations of a
culvert bridge crossing for the Napa County Department
of Public Works. The culverts were originally constructed circa 1970 without a permit from the County. The
existing report was reviewed for adequacy and
conformance to professional engineering practice. The
bridge consisted of two twin concrete barrel culverts, 15 feet in diameter, 18 feet wide, spaced 28 feet apart
center to center, and placed underneath and supporting
perimeter mortared rock retaining walls. Between the
mortared rock retaining walls a 20-foot-deep layer of fill had been placed making the road travel way. The culvert crossing provided access to a private property residence off of Soda Canyon Road.
Cotati Creek Bypass
Senior Structural Engineer
City of Cotati | Cotati, CA
As Senior Structural Engineer designed an addition to
an existing concrete box culvert and a bypass conduit
along Cotati Creek.
|
T 1 707 523 1010 | E [email protected] www.ghd.com Kristine Gaspar
Resource Agency Permitting
Location
Santa Rosa, CA
Experience
25 years
Qualifications/Accreditations
– MPA, Public Administration, California State University, Sonoma, CA, 1995 – BA, Environmental Studies and Planning, California State University, Sonoma, CA, 1992 Key Technical Skills
– CEQA Compliance
– Resource Agency Permitting
Memberships
– American Planning Association
– Association of Environmental Professionals
Relevant Experience Summary
Kristine Gaspar’s experience includes 25 years of environmental planning, CEQA compliance, resource agency permitting, data research and analysis, grant writing, and community surveys. Kristine has been involved in environmental analysis on a wide variety of projects from private development to infrastructure projects, including roadways, schools, recycled water, and park facilities. She is currently the project manager for the Laguna Treatment Plant Compliance project and Ellis Creek Water Recycling CEQA Compliance project. Kristine’s projects are often complex with multiple deadlines.
Sonoma-Marin Area Rail Transit (SMART)
Larkspur Extension
Project Planner
SMART | Marin County, CA
Kristine assisted SMART with obtaining USACE
Nationwide Permit, RWQCB Region Water Quality
Certification, and California Department of Fish & Wildlife (CDFW) Streambed Alteration Agreement), preparing the
mitigation plan for permanent impacts to wetlands, and
providing support during construction of the Larkspur Rail Extension from San Rafael to Larkspur.
Jennings Avenue Pedestrian Rail Crossing
Environmental Impact Report (EIR)
Project Planner
City of Santa Rosa | Santa Rosa, CA
Kristine served as Project Planner for this EIR, which
evaluated construction and operation of an official atgrade pedestrian and bicycle rail crossing in the City of Santa Rosa and the possible closure of an at-grade rail crossing at one of three locations in Downtown Santa
Rosa. Kristine was in charge of writing the Air Quality and Greenhouse Gas (GHG) sections.
Fulton Road Widening Improvement Project
Quality Control Reviewer
City of Santa Rosa | Santa Rosa, CA
Kristine served as Quality Control Reviewer for the
permitting phase of the project. The project includes
roadway widening, new vehicle travel lanes, bicycle
lanes, sidewalks, bioretention areas, bus stops,
landscaping, utility relocations, stormwater facilities, and property acquisitions and easements. The project would
result in fill in Forestview Creek, Peterson Creek, several roadside wetland and non-wetland ditches, and a
seasonal wetland. Kristine assisted in the permitting
services for the project, which included obtainment of a Section 404 Nationwide Permit; 401 Water Quality
Certification; and Section 2081 Incidental Take Permit.
Grant Avenue Bridge Rehabilitation CEQA and
Permitting
Quality Control Reviewer
City of Novato | Novato, CA
Kristine provided quality control reviewing for permitting of this bridge rehabilitation project within Caltrans District
4. The project includes rehabilitating and widening an
existing vehicle and pedestrian bridge, as well as
stabilizing the banks and channel on the upstream
Kristine Gaspar | Resource Agency Permitting
T 1 707 523 1010 | E [email protected] www.ghd.com portion of Novato Creek. The project also includes grant authorization from the Caltrans Highway Bridge
Replacement and Rehabilitation Program for partial
federal funding. Technical studies included a natural
environment study, biological assessment, Area of
Potential Effects (APE) mapping, archaeological study
report, historic resources evaluation report, and several technical memorandums. Permitting applications include
a Section 404 Nationwide Permit, 401 Water Quality
Certification, and Section 1602 Streambed Alteration
Agreement.
SMART Payran to Southpoint Non-Motorized
Trail Permitting
Task Lead: Permitting and NEPA Document
Consistency
SMART | Sonoma County, CA
Kristine assisted SMART with obtaining permits (USACE
Nationwide Permit, RWQCB Region Water Quality
Certification, and CDFW Streambed Alteration
Agreement), and provided support during construction
for the Payran to Southpoint section of the proposed
non-motorized trail along the rail right of way.
Richmond Ferry Terminal Permitting
Project Planner
San Francisco Bay Ferry
Richmond, CA
Kristine oversaw the resource agency permitting process and supporting technical studies for this new Water
Emergency Transportation Authority (WETA) ferry
terminal to be located at the terminus of Harbour Way
South, in Richmond. Approvals included Dredged
Material Management Office (sediment quality sampling
plan and disposal plan), USACE (Nationwide Permit),
San Francisco RWQCB (401 Certification), and Bay
Conservation Development Commission (Administrative
Permit).
Vallejo Ferry Maintenance Facility IS/MND and
Permitting
Project Planner
Oregon & California Railroad | Vallejo, CA
Kristine oversaw preparation of the IS/MND and was
responsible for coordinating and securing the resource
agency permitting. The project included the construction of a new docking and maintenance facility within Mare
Island Strait for WETA. The permitting agencies involved include Bay Conservation Development Commission
(Major Permit), USACE (Section 10 Permit and Waiver
to build within Federal Channel), San Francisco RWQCB
(Water Quality Certification), National Marine Fisheries Service (Formal Consultation), California Department of Fish & Game (Streambed Alteration Agreement and
Incidental Take Permit), and US Coast Guard (approval
to build within Federal Channel). The project also
involved coordination with Navy Base Realignment and
Closure (BRAC).
MLK Jr. Regional Park Bay Trail
Permitting, CEQA, and Caltrans Task Lead
East Bay Regional Park District | Oakland, CA
As the Permitting and CEQA Task Lead, Kristine is
responsible for obtaining resource agency permits and
CEQA clearance for construction of a segment of the
Bay Trail that is being implemented by East Bay
Regional Park District. The site has challenges as it is within the 100-year flood, a condition that will worsen with sea level rise, and the park improvements will
encroach into San Leandro Bay and State Route (SR)
61. Involved agencies include USACE, San Francisco
RWQCB, National Marine Fisheries Service, and Bay
Conservation and Development Commission. In
addition, numerous technical reports in support of the
Caltrans funding process were prepared, including
Natural and Environmental Sciences, Community
Impact, Sea Level Rise, and Visual Impacts.
Windsor River Road/Windsor Road Intersection
and Bike Path Improvement
Task Lead: CEQA and Caltrans Documentation
Town of Windsor | Windsor, CA
Kristine served as Project Planner overseeing the CEQA
Notice of Exemption and documentation, and Caltrans
Environmental Review Process. This project
transformed the intersection from a traditional
four-way/signalized intersection to a roundabout,
improving the pedestrian safety and functionality, which also includes a rail line. In addition, 800 linear feet of a multi-use Class 1 trail was constructed within the rail right of way.
Petaluma Trestle Rehabilitation Project IS/MND
and Permit Support Documents
Project Manager
City of Petaluma | Petaluma, CA
This project involved rehabilitating a historic railroad trestle as a promenade for pedestrian and trolley traffic along the Petaluma River Waterfront. The trestle is a
beloved structure in the community, which led to active public participation in the preliminary design and
environmental review process. Kristine served as Project Manager for an initial study that evaluated the complex issues surrounding the trestle’s historical significance. In addition, the initial study evaluated the project’s impact on special-status aquatic species, and the impacts of
construction vibration on the neighboring businesses.