City Council
Regular Meeting
AGENDA
(to be held both at the physical and virtual locations below) Civic Center Council Chamber ♦ 300 Seminary Avenue ♦ Ukiah, CA 95482 To participate or view the virtual meeting, go to the following link: https://zoom.us/j/97199426600 Or you can call in using your telephone only:
Call (toll free) 1-888-788-0099
Enter the Access Code: 971 9942 6600
To Raise Hand enter *9
To Speak after being recognized: enter *6 to unmute yourself Or One tap mobile (for easy connection on smart phones):
US: +16699009128,,97199426600# or +12532158782,,97199426600# Alternatively, you may view the meeting (without participating) by clicking on the name of the meeting at www.cityofukiah.com/meetings.
June 15, 2022 - 6:00 PM
1. ROLL CALL
2. PLEDGE OF ALLEGIANCE
3. PROCLAMATIONS/INTRODUCTIONS/PRESENTATIONS
3.a. Proclamation: Recognizing Juneteenth - National Freedom Day: A Day of Observance in the City of Ukiah.
Recommended Action: Issue a proclamation of the Ukiah City Council recognizing Juneteenth - National Freedom Day: A Day of Observance in the City of Ukiah.
Attachments:
1. Juneteenth National Freedom Day A Day of Observance (002)
2. Juneteenth Celebration
4. PETITIONS AND COMMUNICATIONS
5. APPROVAL OF MINUTES
5.a. Approval of the Minutes for the June 1, 2022, Special Meeting.
Recommended Action: Approve the Minutes for the June 1, 2022, Special Meeting.
Attachments:
1. 2022-06-01 Draft Minutes - Special Budget Hearing
5.b. Approval of the Minutes for the June 1, 2022, Regular Meeting.
Recommended Action:
Attachments:
1. 2022-06-01 Draft Minutes - Regular
5.c. Approval of the Minutes for the June 2, 2022, Special Meeting.
Recommended Action: Approve minutes for the June 2, 2022, special meeting.
Attachments:
1. 2022-06-02 Draft Minutes - Special Budget Hearing
6. RIGHT TO APPEAL DECISION
Persons who are dissatisfied with a decision of the City Council may have the right to a review of that decision by a court. The City has adopted Section 1094.6 of the California Code of Civil Procedure, which generally limits to ninety days (90) the time within which the decision of the City Boards and Agencies may be judicially challenged.
7. CONSENT CALENDAR
The following items listed are considered routine and will be enacted by a single motion and roll call vote by the City Council.
Items may be removed from the Consent Calendar upon request of a Councilmember or a citizen in which event the item will be considered at the completion of all other items on the agenda. The motion by the City Council on the Consent Calendar will approve and make findings in accordance with Administrative Staff and/or Planning Commission recommendations.
7.a. Report of Disbursements for the Month of May 2022.
Recommended Action: Approve the Report of Disbursements for the Month of May 2022.
Attachments:
1. May 2022 Summary of Disbursements
2. Account Codes for Reference
3. Object Codes for Reference
4. May 2022 Disbursement Detail
7.b. Award Three-Year Contract to Evergreen Job and Safety Training in the Amount of $84,012.00 to Provide Job and Safety Training for Electric Utility Employees.
Recommended Action: Award Three-Year Contract to Evergreen Job and Safety Training in the Amount of $84,012.00 to Provide Job and Safety Training for Electric Utility Employees.
Attachments:
1. Ukiah - 2022 - 3 year Proposal
7.c. Adoption of Resolution of the City Council Reconsidering the Circumstances of the State of Emergency and Implementing Teleconferencing Requirements for City Council and Board and Commission Meetings During a Proclaimed State of Emergency Due to the COVID-19 Pandemic.
Recommended Action: Adopt a Resolution of the City Council Reconsidering the Circumstances of the State of Emergency and Implementing Teleconferencing Requirements for City Council and Board and Commission Meetings during a Proclaimed State of Emergency Due to the COVID-19 Pandemic.
Attachments:
1. AB 361 Findings Reconsideration for All Legislative Bodies
7.d. Receive Annual Report Regarding the City of Ukiah's Electric Utility Wildfire Mitigation Plan in Response to Senate Bill 901.
Recommended Action: Receive annual report regarding the City of Ukiah's Electric Utility Wildfire Mitigation Plan in response to Senate Bill 901.
Attachments:
1. Ukiah's Wildfire Mitigation Plan_Revision 3_06-15-22
2. Ukiah's Wildfire Mitigation Plan_Revision 3_redline
7.e. Notification of Publishing Services Agreement by Ukiah Daily Journal for Fiscal Year 2022/2023, in the Amount of $6.25 per Column Inch for the First Insertion and $4.26 per Column Inch for Each Subsequent Insertion of the Same Advertisement.
Recommended Action: Receive and approve notification/agreement of the legal publishing services of Ukiah Daily Journal for fiscal year 2022/2023, in the amount of $6.25 per column inch for the first insertion, and $4.26 per column inch for each subsequent insertion for the same advertisement.
Attachments:
1. Legal contract-City of Ukiah eff 2022-2023
7.f. Requesting Council to Reject All Proposals Received and Reinitiate A Request for Proposal Process for the Replacement of the Todd Grove Park Large Playground.
Recommended Action: Reject all proposals received and authorize staff to reinitiate a Request for Proposal process for replacement of the large playground equipment at Todd Grove Park.
Attachments:
1. Miracle_ToddGrovePark-RFP-FINAL-MPI
2. SimpsonRFP
3. ParkPlanetRFP
7.g. Finalization of an Internal Loan for the Two (2) Ambulances Currently On Order, and Adoption of Corresponding Resolution.
Recommended Action: Approve the finalization of an internal loan for the two (2) ambulances currently on order, and approval of the corresponding resolution.
Attachments:
1. Ambulance Reso and Amo
2. TMUBMUSD10Y _ U.S. 10 Year Treasury Note Historical Prices - WSJ
7.h. Finalization of an Internal Loan for the Ice Rink Purchased in September 2021, and Adoption of Corresponding Resolution.
Recommended Action: Finalize the internal loan for the Ice Rink purchased in September 2021, and approve the corresponding resolution.
Attachments:
1. Resolution 2022 - Ice Rink
2. TMUBMUSD10Y _ U.S. 10 Year Treasury Note Historical Prices - WSJ
7.i. Approval of Refinancing of the Ukiah Valley Fire District Lovers Lane Mortgage through the General Fund, and Adoption of Corresponding Resolution.
Recommended Action: Approve refinancing of the Ukiah Valley Fire District Lovers Lane Mortage through the General Fund 100, and approve the corresponding resolution, contingent upon the Ukiah Valley Fire District Board's approval.
Attachments:
1. Lovers Lane Resolution and Amo Schedule
2. TMUBMUSD10Y _ U.S. 10 Year Treasury Note Historical Prices - WSJ
7.j. Report to City Council Regarding Contract for Sundays in the Park Concert Recommended Action: Receive report regarding payment to Seismonos Inc., representing Ozomotli, for band performance at the 2022 Sundays in the Park Concert Series in the amount of $14,000.
Attachments:
1. Ozomatli Contract
7.k. Award of Contract for Compaction and Materials Testing Services in the Amount to be Presented to Council for the Road Reconstruction Bond Projects 2022, Specification No. 19-01, 21-04 and 21-05, and Authorize Additional Tests if Needed.
Recommended Action: Award of Contract to the Selected Consultant for Compaction and Materials Testing Services in the Amount to be Presented to Council for the Road Reconstruction Bond Projects 2022, Specification No. 19-01, 21-04 and 21-05, and Authorize Additional Tests if Needed.
Attachments:
1. RFP - Compaction Testing - Dora Construction On Call
2. Proposals - Forthcoming on 6-13-22
7.l. Award Contract to Doolittle Construction LLC in the amount of $492,666.04 for the 2022 Slurry Seal of Local Streets, and Approve Corresponding Budget Amendment.
Recommended Action: Award contract to Doolittle Construction LLC in the amount of $492,666.04 for the 2022 Slurry Seal of Local Streets, and approve corresponding budget amendment.
Attachments:
1. Spec No 22-01 Slurry Seal of Local Streets - Final
2. Bid Results - Spec 22-01 - Slurry Seal of Local Streets
3. Bid - Doolittle Construction
8. AUDIENCE COMMENTS ON NON-AGENDA ITEMS
The City Council welcomes input from the audience. If there is a matter of business on the agenda that you are interested in, you may address the Council when this matter is considered. If you wish to speak on a matter that is not on this agenda, you may do so at this time. In order for everyone to be heard, please limit your comments to three (3) minutes per person and not more than ten (10) minutes per subject. The Brown Act regulations do not allow action to be taken on audience comments in which the subject is not listed on the agenda.
9. COUNCIL REPORTS
10. CITY MANAGER/CITY CLERK REPORTS
11. PUBLIC HEARINGS (6:15 PM)
11.a. Receive Public Comment on the Scope and Content of the Environmental Impact Report for the 2040 General Plan.
Recommended Action: Receive public comment on the scope and content of the Environmental Impact Report (EIR) for the 2040 General Plan.
Attachments:
1. UKGP_EIR_NOP_5-31-22-_signed
11.b. Conduct a Public Hearing to Consider Adoption of a Resolution Approving the Submittal of an Application in Response to the 2022 State Community Development Block Grant Program Notice of Funding Availability; and Approve Corresponding Budget Amendments if Awarded the Grant.
Recommended Action: 1) Conduct a public hearing to consider approval of application submittal to the State Department of Housing and Community Development; and 2) adopt a resolution authorizing the submittal of a 2022 State Community Development Block Grant application; and 3) approve the corresponding budget amendments if awarded.
Attachments:
1. 2022 CDBG NOFA
2. Local Application CDD Planning Grant
3. 2022 CDBG Resolution
12. UNFINISHED BUSINESS
12.a. Approval and Adoption of 2022-23 Fiscal Year City Budget through Resolution, Five-Year Capital Improvement Plan, the Gann Limit Resolution, and Budget Agreement with the Ukiah Valley Sanitation District.
Recommended Action: Taken Separately:
1. Approve and adopt budget resolution for the fiscal year 2022-23,
2. Approve and adopt Gann Limit resolution for fiscal year 2022-23,
3. Approve (in substantial form) and authorize City Manager to sign fiscal year 2022-23 budget agreement with the Ukiah Valley Sanitation District,
Attachments:
1. FY 22-23 Budget Resolution
2. CIP -5 year-FYE 2023 - Final
3. Vehicle & Heavy Equipment Request & Justification Forms
4. Gann Limit Resolution 2023
5. Budget Agreement with the Ukiah Valley Sanitation District for FY 2022-23
6. Budget Changes
13. NEW BUSINESS
13.a. Possible Adoption of Resolution Endorsing the Declaration of a Climate Emergency and a Call to Action to Restore a Safe Climate.
Recommended Action: Adopt Resolution Endorsing the Declaration of a Climate Emergency and a Call to Action to Restore a Safe Climate.
Attachments:
1. Resolution Climate Emergency 2022
13.b. Consider Participation in a Voluntary Regional Water Sharing Program.
Recommended Action: Approve participation in a Voluntary Regional Water Sharing Program.
Attachments:
1. Upper Russian River 2022 Water Sharing Agreement
13.c. Possible Introduction by Title Only of an Ordinance of the City Council of the City of Ukiah Repealing Articles 1A and 2 in Division 1, Chapter 4 of the Ukiah City Code to Remove References to Obsolete Boards and Commissions.
Recommended Action: Introduce by title only the Ordinance of the City Council of the City of Ukiah repealing Articles 1A and 2 in Division 1, Chapter 4 of the Ukiah City Code to remove references to obsolete boards and commissions.
Attachments:
1. 13b Obsolete Boards and Commissions Ordinance
13.d. Receive Updates on City Council Committee and Ad Hoc Assignments, and, if Necessary, Consider Modifications to Assignments and/or the Creation/Elimination of Ad Hoc(s).
Recommended Action: Receive report(s). The Council will consider modifications to committee and ad hoc assignments along with the creation/elimination ad hoc(s).
Attachments:
1. 2022 City Council Special Assignments
14. CLOSED SESSION - CLOSED SESSION MAY BE HELD AT ANY TIME DURING THE MEETING
14.a. Conference with Legal Counsel—Anticipated Litigation (Government Code Section 54956.9(d)(2 & 3))
Significant exposure to litigation pursuant to Government Code Section 54956.9(d)(2)(Number of potential cases: 1)
Recommended Action:
Attachments: None
14.b. Conference with Legal Counsel – Existing Litigation (Government Code Section 54956.9(d)(1)
Name of case: Roofing & Solar Construction, Inc. v. City of Ukiah et al., Mendocino County Superior Court Case No. 22CV00048
Recommended Action:
Attachments: None
14.c. Conference with Legal Counsel – Existing Litigation (Government Code Section 54956.9(d)(1))
Name of case: Vichy Springs Resort v. City of Ukiah, Et Al; Case No. SCUK-CVPT-2018-70200 Recommended Action:
Attachments: None
14.d. Conference with Legal Counsel – Existing Litigation (Government Code Section 54956.9(d)(1))
Name of case: Russian River Keepers et al. v. City of Ukiah, Case No. SCUK-CVPT-20-74612 Recommended Action:
Attachments: None
14.e. Conference with Legal Counsel – Existing Litigation (Cal. Gov’t Code Section 54956.9(d)(1))
Name of case: Siderakis v. Ukiah, et al, Mendocino County Superior Court, Case No. 21CV00603
Recommended Action:
Attachments: None
14.f. Conference with Labor Negotiator (54957.6)
Agency Representative: Sage Sangiacomo, City Manager
Employee Organizations: All Bargaining Units
Recommended Action:
Attachments: None
15. ADJOURNMENT
Please be advised that the City needs to be notified 72 hours in advance of a meeting if any specific accommodations or interpreter services are needed in order for you to attend. The City complies with ADA requirements and will attempt to reasonably accommodate individuals with disabilities upon request. Materials related to an item on this Agenda submitted to the City Council after distribution of the agenda packet are available for public inspection at the front counter at the Ukiah Civic Center, 300 Seminary Avenue, Ukiah, CA 95482, during normal business hours, Monday through Friday, 8:00 am to 5:00 pm.
I hereby certify under penalty of perjury under the laws of the State of California that the foregoing agenda was posted on the bulletin board at the main entrance of the City of Ukiah City Hall, located at 300 Seminary Avenue, Ukiah, California, not less than 72 hours prior to the meeting
set forth on this agenda.
Kristine Lawler, City Clerk
Dated: 6/9/22
Agenda Item No: 3.a.
MEETING DATE/TIME: 6/15/2022
ITEM NO: 2022-1738
AGENDA SUMMARY REPORT
SUBJECT: Proclamation: Recognizing Juneteenth - National Freedom Day: A Day of Observance in the City of Ukiah.
DEPARTMENT: City Manager /
Admin PREPARED BY: Traci Boyl, Management Analyst
PRESENTER: Mayor Brown
ATTACHMENTS:
1. Juneteenth National Freedom Day A Day of Observance (002)
2. Juneteenth Celebration
Summary: The City Council will issue a proclamation recognizing Juneteenth - National Freedom Day: A Day of Observance in the City of Ukiah.
Background: The City of Ukiah is committed to equity, equality, and justice, and we encourage the community to reflect on the historical struggle for human rights faced by African Americans and also our incredible capacity to heal, hope, and emerge from our darkest moments with purpose and resolve by issuing a proclamation (Attachment 1). The City encourages the community to come together to celebrate Juneteenth, to educate themselves to be empowered. Additional information can be found in the attached flyer (Attachment 2).
Discussion: Council will issue the proclamation in recognition of Juneteenth - National Freedom Day: A Day of Observance in the City of Ukiah.
Recommended Action: Issue a proclamation of the Ukiah City Council recognizing Juneteenth - National Freedom Day: A Day of Observance in the City of Ukiah.
BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: N/A
WHEREAS, President Abraham Lincoln signed the Emancipation Proclamation on January 1, 1863, declaring the slaves in Confederate territory free, paving the way for the passing of the 13th Amendment, which formally abolished slavery in the United States of America; and WHEREAS, enslaved Americans finally received word that they were free from bondage more than two years later, on June 19, 1865; and
WHEREAS, as those who were formerly enslaved were recognized for the first time as citizens, Black Americans came together to commemorate Juneteenth with celebrations across the country; and
WHEREAS, June 19th is a day of profound weight and power, a day in which we remember the moral stain and terrible toll of slavery on our country; and WHEREAS, “JUNETEENTH,” combining the words June and Nineteenth, has been celebrated for over 150 years and has significant and special meaning to African-Americans; and WHEREAS, Juneteenth National Independence Day became a US federal holiday when President Joe Biden signed it into law on Thursday, June 17th, 2021; and WHEREAS, this day of reflection shall remind us of the historical struggle for human rights faced by African Americans across the country and in our community and also our incredible capacity to heal, hope, and emerge from our darkest moments with purpose and resolve; and WHEREAS, the City of Ukiah is committed to equity, equality, and justice, and we encourage the community to come together to celebrate Juneteenth and to educate themselves to become empowered so that together, we can lay the roots of real and lasting justice; and NOW, THEREFORE BE IT RESOLVED, that the Ukiah City Council, hereby recognizes June 19, 2022, as Juneteenth - National Freedom Day: A Day of Observance in the City of Ukiah Juneteenth – National Freedom Day: A Day of
Observance in the City of Ukiah.
Signed and sealed, this 15th day of June in the year Two Thousand and Twenty-Two.
Jim Brown
City Council, Mayor
C I T Y O F U K I A H
RECOGNIZING JUNE 19, 2022, AS JUNETEENTHNATIONAL FREEDOM DAY: A DAY OF OBSERVANCE IN
THE CITY OF UKIAH
Attachment 1
Hosted by
MendoCoast
BIPOC
une
lpm-4pm
•••
Big River Beach, Riverside
Mendocino
Bring a picnic lunch.
Celebrating
Black joy, fatherhood,
' I friends and family
I
Attachment 2
AGENDA ITEM 5a
CITY OF UKIAH
CITY COUNCIL MINUTES
Special Budget Hearing
Virtual Meeting Link: https://zoom.us/j/97199426600
Ukiah, CA 95482
June 1, 2022
4:00 p.m.
1. ROLL CALL AND PLEDGE OF ALLEGIANCE
Ukiah City Council met at a Special Meeting on June 1, 2022, having been legally noticed on May 27, 2022. The meeting was held virtually at the following link: https://zoom.us/j/97199426600. Mayor Brown called the meeting to order at 4:00 p.m. Roll was taken with the following Councilmembers
Present: Juan V. Orozco, Douglas, F. Crane, Mari Rodin, Josefina Dueňas, and Jim O. Brown. Staff
Present: Sage Sangiacomo, City Manager; and Kristine Lawler, City Clerk.
MAYOR BROWN PRESIDING.
The Pledge of Allegiance was led by Dan Buffalo, Finance Director.
2. AUDIENCE COMMENTS ON NON-AGENDA ITEMS
No public comment was received.
3. BUDGET HEARING
a. Presentation of the Draft 2022-23 Fiscal Year City Budget and Draft Five-Year Capital Improvement Plan.
Presenter: Dan Buffalo, Finance Director.
Overview: Dan Buffalo, Finance Director.
City Manager’s Office – Sage Sangiacomo, City Manager (5:21 p.m.) Human Resources / Risk Management – Sheri Mannion, Human Resources Director/Risk Manager (5:25 p.m.)
Airport – Greg Owen, Airport Manager (5:40 p.m.)
Finance:
Financial Department Overview – Dan Buffalo, Finance Director (5:43 p.m.) Disbursements (Accounts Payable and Payroll) – Sarah Brown, Financial Services Specialist II (5:45 p.m.) Utility Billing and Customer Services – Lori Martin, Billing and Customer Services Manager (5:47 p.m.) Accounting and Budget – Olga Keough, Finance Controller (5:50 p.m.) Procurements (Capital, and Grants) – Mary Horger, Financial Services Manager (5:56 p.m.) Information Technology – Ryan Burkhart, I.T. Manager (5:58 p.m.)
4. ADJOURNMENT
There being no further business, the meeting adjourned at 6:00 p.m. ________________________________
Kristine Lawler, City Clerk
AGENDA ITEM 5b
CITY OF UKIAH
CITY COUNCIL MINUTES
Regular Meeting
Virtual Meeting Link: https://zoom.us/j/97199426600
Ukiah, CA 95482
June 1, 2022
6:00 p.m.
1. ROLL CALL
Ukiah City Council met at a Regular Meeting on June 1, 2022, having been legally noticed on May 27, 2022. The meeting was held virtually at the following link: https://zoom.us/j/97199426600. Mayor Brown called the meeting to order at 6:10 p.m. Roll was taken with the following Councilmembers
Present: Juan V. Orozco, Douglas, F. Crane, Mari Rodin, Josefina Dueňas, and Jim O. Brown.
Staff Present: Sage Sangiacomo, City Manager; David Rapport, City Attorney; and Kristine Lawler, City Clerk.
2. PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by Tyler Simerson, Eagle Scout.
MAYOR BROWN PRESIDING.
3. PROCLAMATIONS/INTRODUCTIONS/PRESENTATIONS
a. Proclamation: Lesbian, Gay, Bisexual, Transgender, Queer (Plus) (LGBTQ+) Pride Month in the City of Ukiah.
Presenter: Councilmember Rodin.
Proclamation was presented and will be delivered to Darren Jackson, representing the LGBTQ+ community.
b. Proclamation: Immigrant Heritage Month in the City of Ukiah.
Presenter: Councilmember Rodin.
Proclamation was received by Vice Mayor Duenas.
c. Receive Presentation of Exceptional Employee Recognition Awards.
Presenters: Neil Davis, Community Services Director; Sage Sangiacomo, City Manager; Lori Martin, Customer Services Supervisor; and Mayor Brown.
Staff comments were given and Certificates received by Kerry Randall, Facility Administrator; Michael Maldonado, Assistant Facility Administrator; Vicki Gilson, Facility Attendant; Kristine Lawler, City Clerk; Diana Macias, Lead Customer Service Representative; and Justin Buckingham, Battalion Chief.
d. Proclamation: Recognition of Tyler Simerson - Eagle Scout Presenters: Councilmember Crane.
Proclamation was received by Tyler Simerson.
City Council Minutes for June 1, 2022, Continued:
RECESS: 6:33 – 6:45 P.M.
e. Presentation of the PFM Group on an Update to the City Council on the City’s Investment Portfolio and Consider Recommended Changes to the City's Investment Policy.
Presenter: Allison Kaune, PFM Group Senior Analyst.
PowerPoint Presentation was received.
Motion/Second: Rodin/Crane to approve the recommended revisions to City's investment policy (Administrative Policy No. 2022-01). Motion carried by the following roll call votes: AYES: Orozco, Crane, Rodin, Dueňas, and Brown. NOES: None. ABSENT: None. ABSTAIN: None.
Council Consensus to hear Agenda Item 11a before the rest of the meeting.
11. PUBLIC HEARINGS (6:15 PM)
a. The City Council will Consider Adoption of a Resolution to Establish the G1 Electric Rate Rider for Self-Generation Customers and Authorize the Electric Utility Director, or His/Her designee, to Execute Self-Generation Interconnection Agreements with Customers Presenters: Cindy Sauers, Electric Utility Director and Boris Prokop, Borismetrics, Inc. Rate Analyst.
PUBLIC HEARING OPENED AT 7:41 P.M.
No public comment was received.
PUBLIC HEARING CLOSED AT 7:42 P.M.
Motion/Second: Crane/Rodin to approve the Resolution (2022-36) establishing the G1 Electric Rate Rider for self-generation customers, and authorizing the Electric Utility Director, or his/her designee, to execute self-generation Interconnection agreements (COU No. 2122-244; subsequent agreements will have tags:1, 2, 3, etc…) with customers – with amendment. Motion carried by the following roll call votes: AYES: Orozco, Crane, Rodin, Dueňas, and Brown. NOES: None. ABSENT:
None. ABSTAIN: None.
4. PETITIONS AND COMMUNICATIONS
The clerk stated that no communications had been received.
5. APPROVAL OF MINUTES
a. Approval of the Minutes for the May 18, 2022, Regular Meeting.
Motion/Second: Rodin/Crane to approve Minutes of May 18, 2022, a regular meeting, as submitted. Motion carried by the following roll call votes: AYES: Orozco, Crane, Rodin, Dueňas, and Brown. NOES: None. ABSENT: None. ABSTAIN: None.
6. RIGHT TO APPEAL DECISION
Mayor directive to hear Agenda Item 10 before the remaining items.
10. CITY MANAGER/CITY CLERK REPORTS
Presenters: Sage Sangiacomo, City Manager; and
Status of Electric Generation and Transmission for the Summer of 2022 – Cindy Sauers, Electric Utility Director and Randy Howard, Northern California Power Agency General Manager.
City Council Minutes for June 1, 2022, Continued:
Mayor directive to agendize this item for a follow-up report.
Mayor directive to hear Agenda Item 13a before the remaining items.
13. NEW BUSINESS
a. Council to Receive Status Report on the Ukiah Valley Golf Course and Consider Approval of the 2022/2023 Capital Improvement Plan for the Ukiah Valley Golf Course.
Presenters: Maya Simerson, Project and Grant Administrator.
Motion/Second: Crane/Rodin to approve the 2022/2023 Capital Improvement Plan for the Ukiah Valley Golf Course. Motion carried by the following roll call votes: AYES: Orozco, Crane, Rodin, Dueňas, and Brown. NOES: None. ABSENT: None. ABSTAIN: None.
7. CONSENT CALENDAR
a. Adoption of Resolution (2022-32) Adopting a Policy (Admin Policy No. 2022-02) for Escheatment of Unclaimed Money - Finance.
b. Annual Report on Mobilehome Park Stabilization Fees and Activities, Adoption of Resolution (2022-33) Updating Program Costs, and Approval to Waive Fees for the FY 2021-22 – City Clerk.
c. Report of Acquisition of Professional Services (PO No. 47989) from Alpha Analytical Laboratories, Inc. in the Amount of $27,895 for Quarterly Water Sampling and Completion of Chemical Examination Reports for the Ukiah Landfill – Public Works. d. Notification of Emergency Purchase (PO No. 47926) of all Materials and Labor for the Repair of Traffic Signal Control Cabinets at the Intersections of South State Street and Washington Ave from DC Electric Group in the Amount of $49,895, and Approve a Corresponding Budget Amendment – Public Works.
47926
e. Consideration of Award of Bid (COU No. 2122-240) to Ghilotti Construction Co. in the Amount of $609,806.30 for the Dora Street Overlay Project Specification No. 21-05, and Approval of Corresponding Budget Amendment – Public Works.
f. Adoption of Resolution (2022-34) Calling for the Holding of a General Municipal Election to be Held on November 8, 2022, and to Consolidate and Request the County Clerk to Conduct Said Election with the Statewide General Election (COU No. 2122-241). – City Clerk. g. Approval of Amendment No. 4 to a Professional Services Agreement (COU No. 1920-138-A4) with PSOMAS for an Amount Not to Exceed $2,500 for Professional Consulting Services Related to the City’s Annexation Efforts – Community Development. h. Consideration of Award (COU No. 2021-184-A1) of a One (1) Year Extension of City of Ukiah Agreement No. 2021-184 to AP Triton LLC for Continued Consulting Services for The Ukiah Valley Fire Authority's Pre-Hospital Emergency Medical Services in an Amount not to Exceed $60,000 - Fire.
i. Consideration of Award of Bid (COU No. 2122-242) to Wahlund Construction, Inc. in the Amount of $220,775 for the Ford and Orchard Lift Station Replacement Specification No. 22- 02 – Public Works.
City Council Minutes for June 1, 2022, Continued:
j. Report to Council of Purchase Order Number 47941 Issued to Elemech, Inc. in the Amount of $26,313.44 for the Purchase of Recycled Water Filling Station FS-22 for the Recycled Water Project – Water Resources.
k. Notification of Emergency Purchase (PO No. 47975) of all Materials and Labor for the Repair of Traffic Signal at the Intersections of Perkins Street and Hospital Drive from DC Electric Group in the Amount of $12,765 and Approve Corresponding Budget Amendment – Public Works. l. Consider Approval of an Agreement (COU No. 2122-243) Between the Ukiah Valley Sanitation District and the City of Ukiah Regarding Provision of Interim Sewer Services and Out of Area Service Agreements and Authorization for the Mayor to Execute – Community Development.
m. Consider Adoption of Resolution (2022-35) Adopting Travel and Expense Reimbursement Policy (Admin Policy No. 2022-03) - Finance.
Motion/Second: Rodin/Crane to approve Consent Calendar Items 7a-7m, as submitted. Motion carried by the following roll call votes: AYES: Orozco, Crane, Rodin, Dueňas, and Brown. NOES:
None. ABSENT: None. ABSTAIN: None.
8. AUDIENCE COMMENTS ON NON-AGENDA ITEMS
No public comment was received:
9. COUNCIL REPORTS
No Council reports were received.
10. CITY MANAGER/CITY CLERK REPORTS, Continued
Presenter:
Construction Update – Tim Eriksen, Public Works Director/City Engineer.
12. UNFINISHED BUSINESS
13. NEW BUSINESS, Continued
b. Receive Updates on City Council Committee and Ad Hoc Assignments and, if Necessary, Consider Modifications to Assignments and/or the Creation/Elimination of Ad hoc(s).
No reports were received.
14. CLOSED SESSION
a. Conference with Legal Counsel—Anticipated Litigation (Government Code Section 54956.9(d)(2 & 3))
Significant exposure to litigation pursuant to Government Code Section 54956.9(d)(2)(Number of potential cases: 1)
b. Conference with Legal Counsel – Existing Litigation
(Government Code Section 54956.9(d)(1)
Name of case: Roofing & Solar Construction, Inc. v. City of Ukiah et al., Mendocino County Superior Court Case No. 22CV00048
c. Conference with Legal Counsel – Existing Litigation
(Government Code Section 54956.9(d)(1))
Name of case: Vichy Springs Resort v. City of Ukiah, Et Al; Case No. SCUK-CVPT-2018- 70200
City Council Minutes for June 1, 2022, Continued:
d. Conference with Legal Counsel – Existing Litigation
(Government Code Section 54956.9(d)(1))
Name of case: Russian River Keepers et al. v. City of Ukiah, Case No. SCUK-CVPT-20- 74612
e. Conference with Legal Counsel – Existing Litigation
(Cal. Gov’t Code Section 54956.9(d)(1))
Name of case: Siderakis v. Ukiah, et al, Mendocino County Superior Court, Case No. 21CV00603
f. Conference with Labor Negotiator (54957.6)
Agency Representative: Sage Sangiacomo, City Manager
Employee Organizations: All Bargaining Units
No Closed Session was held.
15. ADJOURNMENT
There being no further business, the meeting adjourned at 8:35 p.m. ________________________________
Kristine Lawler, City Clerk
AGENDA ITEM 5c
CITY OF UKIAH
CITY COUNCIL MINUTES
Special Budget Hearing
Virtual Meeting Link: https://zoom.us/j/97199426600
Ukiah, CA 95482
June 2, 2022
3:00 p.m.
1. ROLL CALL AND PLEDGE OF ALLEGIANCE
Ukiah City Council met at a Special Meeting on June 2, 2022, having been legally noticed on May 27, 2022. The meeting was held virtually at the following link: https://zoom.us/j/97199426600. Mayor Brown called the meeting to order at 3:10 p.m. Roll was taken with the following Councilmembers
Present: Juan V. Orozco, Douglas, F. Crane, Mari Rodin, Josefina Dueňas (arriving at 3:29 p.m.), and Jim O. Brown. Staff Present: Sage Sangiacomo, City Manager; and Kristine Lawler, City Clerk.
MAYOR BROWN PRESIDING.
The Pledge of Allegiance was led by Mayor Brown.
2. AUDIENCE COMMENTS ON NON-AGENDA ITEMS
No public comment was received.
3. BUDGET HEARING
a. Presentation of the Draft 2022-23 Fiscal Year City Budget and Draft Five-Year Capital Improvement Plan.
Presenter: Dan Buffalo, Finance Director.
Community Development:
Overview – Craig Schlatter, Community Development Director (3:17 p.m.) Building Services – Matt Keizer, Building Official (3:21 p.m.) Community Services – Neil Davis, Community Services Director (3:23 p.m.) Electric Utility Department – Cindy Sauers, Electric Utility Director (3:26 p.m.) Water Resources and Public Works – Tim Eriksen, Public Works Director/City Engineer (3:37 p.m.) Ukiah Valley Fire Authority – Doug Hutchison, Fire Chief (3:55 p.m.) Police Department – Noble Waidelich, Police Chief (3:58 p.m.)
4. ADJOURNMENT
There being no further business, the meeting adjourned at 4:15 p.m. ________________________________
Kristine Lawler, City Clerk
Agenda Item No: 7.a.
MEETING DATE/TIME: 6/15/2022
ITEM NO: 2022-1479
AGENDA SUMMARY REPORT
SUBJECT: Report of Disbursements for the Month of May 2022.
DEPARTMENT: Finance PREPARED BY: Candice Rasmason, Accounts Payable PRESENTER: Consent Calendar
ATTACHMENTS:
1. May 2022 Summary of Disbursements
2. Account Codes for Reference
3. Object Codes for Reference
4. May 2022 Disbursement Detail - corrected 6-13-22
Summary: The Council will review and consider approval of the Report of Disbursements for the month of May 2022.
Background: Payments made during the month of May 2022 are summarized in the Report of Disbursements. Further detail is supplied on the Schedule of Bills, representing the five (5) individual payment cycles within the month.
Accounts Payable Check Numbers (City & UVFA): 3047116-3047210; 3047211-3047276; 3047277-3047386; 3047387-3047472; 3047473-3047572
Accounts Payable Wire Transfers: N/A
Payroll Check Numbers: 510619-510673; 5104674-511154
Payroll Manual Check Numbers: N/A
Direct Deposit Numbers: 111203-111465; 111466-111731
Manual Direct Deposit Numbers: N/A
Void Check Numbers: 3047295, 3047399, 3047451, 3047188
Void Direct Deposit Numbers: N/A
Discussion: This report is submitted in accordance with Ukiah City Code Division 1, Chapter 7, Article 1.
Attachment #1: May 2022 Summary of Disbursements
Attachment #2: Account Codes for Reference
Attachment #3: Object Codes for Reference
Attachment #4: May 2022 Disbursement Detail
Recommended Action: Approve the Report of Disbursements for the Month of May 2022.
BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: N/A
Attachment 1
FUNDS:
100 General Fund $158,674.10 700 Sanitary Disposal Site Fund $3,420.45 101 GF-(Sub-Fund) Visit Ukiah 701 Landfill Corrective Fund 105 GF-(Sub-Fund) Fire Authority $93,634.44 702 Disposal Closure Reserve Fund $11,822.58 110 Special General Fund 704 Post Closure Fund - Solid Waste 120 Streets Capital Improvement $65,334.35 710 Ambulance Services Fund $32,613.87 130 Gov'tl Debt SVC/Reserve Fund 720 Golf Fund $14,261.25 200 City Adminstrative Services $116,388.30 730 Confernence Center Fund $2,595.92 201 Worker's Comp Fund 750 Visit Ukiah
202 Liability Fund 777 Airport Fund $14,053.44
203 Garage Fund $6,027.03 778 Airport Capital Improvement Fund $8,400.50 204 Purchasing Fund $5,351.23 779 Special Aviation Fund 205 Billing & Collections Fund $16,708.88 800 Electric Fund $1,060,618.33 206 Public Safety Dispatch Fund $3,960.05 801 Electric Capital Reserve Fund $38,037.09 207 Payroll Posting Fund $321,996.28 803 Lake Mendocino Bond Reserve 208 Building Maintenance/Corp Yard Fund $25,213.36 805 Street Lighting Fund $9,071.74 209 IT Fund $139,051.88 806 Public Benefits Fund $708.00 220 Equipment Reserve Fund 807 Cap and Trade
249 City Housing Bond Proceeds 820 Water Fund $139,936.90 250 Special Revenue Fund 822 Water Capital Improvement Fund $34,278.07 251 Special Projects Reserve Fund 830 Recycled Water Fund $50,652.74 252 Streets/ROW Improvement Fund $81,656.31 840 City/District Sewer Fund $427,665.92 253 CITY PROP 172 $19,441.08 841 Sewer Contruction Fund $20,131.00 300 Park Development Fund 843 Sewer Capital Fund
301 Anton Stadium Fund $0.00 900 Special Deposit Trust $7,215.26 302 Observatory Park Fund 901 General Service (Accts Recv) $435.96 304 Swimming Pool Fund $0.00 902 U.S.W. Billing & Collection $42,804.73 305 Riverside Park Fund $0.00 903 Public Safety - AB 109 $0.00 306 Skate Park Fund $0.00 905 Federal Emergency Shelter Grant 310 Museum Grants 905 Mendocino Emergency Service Authority 311 Alex Rorbaugh Recreation Center Fund $3,796.92 911 Russian River Watershed Association $34,673.61 312 Downtown Business Improvement Fund 915 UVFD $16,218.17 313 LMIHF Housing Asset Fund 916 UVFD PROP 172
314 Winter Special Events 917 UVFD Measure B
315 Advanced Planning Fund $0.00 918 UVFD Mitigation $1,361.78 500 2106 Gas Tax Fund 940 Sanitation District Special Fund 501 2107 Gas Tax Fund 942 Rate Stabilization - UVSD Fund 503 2105 Gas Tax Fund 943 Sanitation District Capital Improvement Fund 505 Signalization Fund 952 REDIP Sewer Enterprise Fund
506 Bridge Fund 960 Community Redevelopment Agency
507 1998 STIP Augmentation Fund 961 RDA Housing Pass-Through 508 SB325 Reimbursement Fund 962 Redevelopment Housing Fund 509 S.T.P. Fund $20,276.37 963 Housing Debt
510 Trans-Traffic Congest Relief Fund 964 RDA Capital Pass-Through 511 Rail Trail Fund $69,178.15 965 Redevelopment Capital Improvement Fund 600 Community Development Block Grant 966 Redevelopment Debt Service 601 EDBG 94-333 Revolving Loan 967 Housing Bond Proceeds 602 Community Development Fund 968 Non-Housing Bond Proceeds 603 08-HOME-4688 969 RDA Obligation Retirement Fund
604 CDBG Grant 09-STBG-6417 844/944 Sewer Capital Projects Fund $34,830.56 605 11-HOME-7654 Fund $0.00
606 CDBG Grant 10-EDEF-7261
607 Prop 84 Grant Fund
609 13-CDBG-8940
610 City RDA Projects Fund
613 Home Program Activities
620 CASP Train Retainage Withheld $1,129.00
630 Asset Seizure Fund $1,470.34 611 CDBG 16-CDBG-11147 $2,653.06 631 Asset Seizure Fund (Drug/Alcohol)
633 H & S Education 11489(B)(2)(A1) $2,000.00
634 Federal Asset Seizure Grants
635 SUP Law Enforcement Service Fund
636 CBTHP Officer
637 Local Law Enforcement Block Grant
638 Asset Forfeiture 11470.2 H & S
639 Special Revenue - Police
640 Parking District Fund $3,250.40
670 Federal American Rescue Fund
691 Museum Fund
695 Transfer Station Fund
696 Solid Waste Mitigation Fund
PAYROLL CHECK NUMBERS: 510619-510673 TOTAL DEMAND PAYMENTS- A/P CHECKS $3,162,999.40 DIRECT DEPOSIT NUMBERS: 111203-111465 TOTAL DEMAND PAYMENTS- EFT's $0.00 PAYROLL PERIOD: 4/17/22-4/30/22 TOTAL PAYROLL CHECKS & DIRECT DEPOSITS $1,164,667.62 PAYROLL CHECK NUMBERS: 510674-511154 TOTAL PAYROLL EFT's (TAXES, PERS, VENDORS) $638,985.46 DIRECT DEPOSIT NUMBERS: 111466-111731 * vendor name( if applicable) PAYROLL PERIOD: 5/1/22-5/14/22
PAYROLL CHECK NUMBERS:
DIRECT DEPOST NUMBERS:
PAYROLL PERIOD:
VOID CHECK NUMBERS: TOTAL PAYMENTS $4,966,652.48
3043320, 3040882, 3047365, 3047805
3047806,
N/A
WIRE TRANSFER NUMBERS:
N/A
CERTIFICATION OF CITY CLERK
This register of Payroll and Demand Payments was duly approved by the City Council on ____________________.
City Clerk
APPROVAL OF CITY MANAGER CERTIFICATION OF DIRECTOR OF FINANCE I have examined this Register and approve same. I have audited this Register and approve for accuracy and available funds.
____________________________________________ ________________________________________________ City Manager Director of Finance
MANUAL CHECK NUMBERS:
CITY OF UKIAH
REPORT OF DISBURSEMENTS
REGISTER OF PAYROLL AND DEMAND PAYMENTS
FOR THE MONTH OF MAY
Account Code Summary Attachment 2
10000000 GENERAL FUND 20012500 CITY CLERK
10017200 SUCCESSOR AGENCY 20012600 ECONOMIC DEVELOPMENT 10020000 POLICE - GEN FUND 20012800 EMERGENCY MANAGEMENT 10020210 POLICE PATROL 20013210 ACCOUNTS PAYABLE
10020214 POLICE VOLUNTEERS 20013220 PAYROLL
10020216 COPS GRANT 20013400 ACCOUNTING
10020217 POLICE ANIMAL CONTROL 20013401 BUDGET MANAGEMENT 10020218 POLICE CSO 20014000 CITY ATTORNEY
10020220 CODE ENFORCEMENT 20015100 CITY TREASURER
10020224 MAJOR CRIMES TASK FORCE 20016100 HUMAN RESOURCES 10021210 CITY FIRE 20023510 HOUSING GRANTS
10022100 PARKS 20023520 NON-HOUSING GRANTS
10022300 AQUATICS 20100000 WORKER'S COMP FUND
10022700 MUSEUM - GEN FUND 20116220 WORKERS COMPENSATION 10022810 RECREATION ADMINISTRATION 20200000 LIABILITY FUND 10022821 ADULT BASKETBALL 20216200 RISK MANAGEMENT
10022822 ADULT SOFTBALL 20300000 GARAGE FUND
10022824 CO-ED VOLLEYBALL 20324100 GARAGE
10022831 YOUTH BASKETBALL 20324110 FLEET MAINTENANCE
10022832 YOUTH SOFTBALL 20400000 PURCHASING FUND
10022840 DAY CAMP 20413500 PURCHASING
10022850 CLASSES & CLINICS 20413510 CAPITAL ASSET MANAGEMENT 10022860 SPECIAL ACTIVITIES 20413520 GRANTS AND SPECIAL PROJECTS 10022900 COMM SVCS SPECIAL SERVICES 20414000 LEGAL SERVICES/EXPENSES 10023100 PLANNING SERVICES 20500000 BILLING AND COLLECTION FUND 10023110 CURRENT PLANNING 20513300 UTILITY BILLING
10023300 BUILDING INSPECTION 20513380 METERING-ELECTRIC 10023320 BUILDING INSPECTION 20513382 METERING-WATER
10023411 CDBG GENERAL ADMIN 20600000 PUBLIC SAFETY DISPATCH FUND 10024200 ENGINEERING/STREETS 20620231 POLICE UKIAH DISPATCH 10024210 ENGINEERING 20620232 POLICE FT BRAGG DISPATCH
10024214 TRAFFIC SIGNAL OPERATIONS 20700000 PAYROLL POSTING FUND 10024224 STORM WATER 20800000 BUILDING & MAINTENANCE
10024310 CORP YARD MAINTENANCE 20822500 BUILDING & MAINTENANCE 10024620 STREETS 20824300 BLDG MAINT CORP YARD
10100000 GF- (SUB-FUND) VISIT UKIAH 20900000 IT FUND
10112700 GF-(SUB-FUND) VISIT UKIAH 20913900 INFORMATION TECHNOLOGY 10500000 MEASURE S GENERAL FUND 22000000 FIXED ASSET FUND 10521210 FIRE AUTHORITY 25100000 SPECIAL PROJECTS RESERVE FUND 12000000 STREET REHABILITATION 25200000 STREETS/ROW IMPROVEMENT FUND 12024200 PUBLIC WORKS ENGINEERING 25224220 STREETS/ROW IMPROVEMENT FUND 13000000 GOV'TL DEBT SVC/RESERVE FUND 25300000 PROP 172 FUND 20000000 CITY ADMINISTRATIVE SERVICES 25321210 CITY FIRE 20010000 CITY COUNCIL 30000000 PARK DEVELOPMENT FEES FUND 20012100 CITY MANAGER 30022200 PARK DEVELOPMENT
20012200 ADMINISTRATIVE SUPPORT 30100000 ANTON STADIUM FUND 20012300 COMMUNITY OUTREACH/PUBLIC INFO 30200000 OBSERVATORY PARK FUND
Account Code Summary Attachment 2
30300000 PLAYGROUND & PARK AMENITIES FU 63620210 CBTHP OFFICER 30322230 PLAYGROUND AND PARK AMENITIES 63800000 ASSET FORFEITURE 11470.2 H&S F 30400000 SWIMMING POOL FUND 63820210 ASSET FORFEITURE 11470 EXPENDI 30522250 RIVERSIDE PARK 63900000 SPECIAL REVENUE POLICE 30600000 SKATE PARK FUND 64000000 PKG. DIST. #1 OPER & MAINT FUN 30700000 SOFTBALL COMPLEX FUND 64012600 ECONOMIC DEVELOPMENT 31100000 ARRC GENERAL OPERATING FUND 64020213 POLICE PARKING ENFORCEMENT 31122000 ARRC 67000000 FEDERAL AMERICAN RESCUE FUNDS
31200000 DOWNTOWN BUSINESS IMPROVEMENT 69500000 TRANSFER STATION 31212600 ECONOMIC DEVELOPMENT 69624000 SOLID WASTE MITIGATION FUND 31300000 LMIHF HOUSING ASSET FUND 70000000 SANITARY DISPOSAL SITE FUND 31323400 HOUSING 70024500 LANDFILL 700
31323431 LMI GENERAL ADMIN 70124500 LANDFILL CORRECTIVE 31500000 ADVANCED PLANNING FUND 70200000 DISPOSAL CLOSURE RESERVE FUND 31523100 COMMUNITY PLANNING 70224500 LANDFILL CLOSURE
50000000 GAS TAX FUND 70400000 POST CLOSURE FUND-SOLID WASTE 50024214 TRAFFIC SIGNAL OPERATIONS 71000000 AMBULANCE SERVICES FUND 50500000 SIGNALIZATION FUND 71021100 AMBULANCE SERVICES 50800000 SB325 REIMBURSEMENT FUND 72000000 GOLF FUND
50824210 SB325 ENGINEERING 72022400 GOLF
50900000 S.T.P. 73000000 CONFERENCE CENTER FUND
50924210 STP ENGINEERING 73022600 CONFERENCE CENTER
51100000 RAIL TRAIL FUND 77700000 AIRPORT FUND
51124210 Rail Trail 77714000 CITY ATTORNEY
60000000 COMM. DEVELOPMT. BLOCK GRANT F 77725200 AIRPORT OPERATIONS 60023411 CDBG GENERAL ADMIN 77800000 AIRPORT CAPITAL IMPROVEMENT FU 60023412 CDBG ACTIVITY DELIVERY 77825200 AIRPORT CAPITAL 61100000 CDBG 16-CDBG-11147 77900000 SPECIAL AVIATION FUND 61112600 CDBG ECONOMIC DEVELOPMENT 77925200 AIRPORT SPECIAL 61123410 16-CDBG-11147 80000000 ELECTRIC FUND
61123411 CDBG GENERAL ADMIN 80014000 CITY ATTORNEY
61200000 FUND 612 UNASSIGNED 80026110 ELECTRIC OVERHEAD 61223400 HOME CDD HOUSING 80026120 ELECTRIC UNDERGROUND 61223422 HOME ACTIVITY DELIVERY 80026200 TELEMETRY & CALIBRATION 61323400 HOME HOUSING ACTIVITIES 80026210 SUBSTATION
61323421 HOME GENERAL ADMIN 80026220 HYDROELECTRIC PLANT 62000000 CASP CERTIF & TRAINING 80026400 ELECTRIC ADMINISTRATION 62023320 CASP CERTIF & TRAINING 80026440 POWER PURCHASES 63000000 ASSET SEIZURE FUND 80100000 ELECTRIC CAPITAL RESERVE FUND 63020210 ASSET SEIZURE EXPENDITURE 80126100 ELECTRIC CIP 63300000 H&S EDUCATION 11489(B)(2)(A1) 80126220 HYDROELECTRIC PLANT 63320210 H&S ASSET SEIZURE EXPENDITURE 80500000 STREET LIGHTING FUND 63400000 FEDERAL ASSET SEIZURE GRANTS F 80526150 STREET LIGHTING 63420250 FED ASSET SEIZURE EXPENDITURE 80600000 PUBLIC BENEFITS CHARGES FUND 63500000 SUP.LAW ENFORCE.SVC.FD(SLESF) 80626450 PUBLIC BENEFITS 63520210 SLESF 80700000 ELECTRIC CAP AND TRADE FUND
63600000 CBTHP OFFICER 80800000 ELECTRIC LOW CARBON FUEL STDS
Account Code Summary Attachment 2
80826100 ELECTRIC LOW CARBON FUEL STDS
82000000 WATER FUND
82027110 WATER
82027111 PROD OPERATIONS & MAINTENANCE
82027114 DISTRIB OPERATIONS & MAINT
82100000 WATER CAPITAL RESERVE FUND
82200000 WATER CONNECTION FEE FUND
82227113 WATER DISTRIBUTION CAPITAL
83000000 RECYCLED WATER
83027330 RECYCLED WATER
84000000 CITY/DIST. SEWER OPERATING FUN
84027220 WASTE WATER
84027221 CITY WASTE O & M
84027225 WASTE TREATMENT O & M
84100000 SEWER BOND DEBT SERVICE FUND
84127226 WASTEWATER TREATMENT CAPITAL
84200000 RATE STABILIZATION-CITY FUND
84300000 CONNECTION FEE SEWER FUND (CAP
84400000 CITY SEWER CAPITAL PROJECTS FU
84427221 CITY WASTEWATER O&M 844
84427222 CITY WASTE CAPITAL
90000000 SPECIAL DEPOSIT TRUST FUND
91500000 UKIAH VALLEY FIRE DEPARTMENT
91521400 UVFD FIRE ADMINISTRATION
91600000 UVFD PROP 172
91621400 UVFD PROP 172
91700000 UVFD MEASURE B UNASSIGNED
91721400 UVFD FIRE
91800000 UVFD MITIGATION FEES
91821400 UVFD MITIGATION
96900000 REDEVELOPMENT OBLIGATION RETIR
96917200 SUCCESSOR AGENCY
96995669 969 - RDA OBLIGATION RETIREMEN
51211 PERS UNFUNDED LIABILITY 54101 POSTAGE
51220 INSURANCE 54102 SMALL TOOLS
51230 WORKERS COMP 54103 LAB SUPPLIES
51240 MEDICARE 54106 SPECIALTY SUPPLIES
51260 FICA 54107 EMS SUPPLIES
51270 UNIFORM ALLOWANCE 54120 PW - SPECIAL SUPPLIES
51290 CELL PHONE STIPEND 54121 PW - ASPHALT CONCRETE
52100 CONTRACTUAL SERVICES 54122 PW - AGGREGATE BASE
52110 AMBULANCE BILLING 54124 PW - CONCRETE/SUPPLIES
52111 DEFIBRILLATOR MAINTENANCE 54125 PW - TRAFFIC PAINT 52112 M. S. OVERSIGHT 54126 PW-PREMARKS
52113 PLANNING STUDIES 54127 PW - SIGN POSTS/SHEETING
52114 COMPLIANCE STUDIES 54128 PW - COLD PATCH MATERIAL 52130 EDUCATIONAL & MARKETING MATL'S 54129 PW - TACK OIL 52131 ASSISTANCE TO SENIORS 54130 PW - SAFETY
52133 MONTHLY DISCOUNT PROGRAM 54131 PW - BARRICADES & CONES 52134 GENERAL ADMIN 54161 BACKGROUND & PHYSICALS
52135 ENERGY CONSERVATION PROGRAM 54162 ADVERTISING
52137 PUBLIC BENEFITS PROGRAM MGMT 54163 INTERVIEW SUPPLIES 52139 RESEARCH DEVELOPMENT & DEMO 54165 NEW EMPLOYEE FINGERPRINT 52150 LEGAL SERVICES/EXPENSES 54166 DOT TESTING PROGRAM 52151 EMPLOYEE BENEFIT ADMIN FEES 54167 EMPLOYEE DEVELOPMENT 52155 ACTIVITY DELIVERY 54169 LIVESCAN
52180 SECURITY SERVICES 54201 PRISONER EXPENSE
52181 VOLUNTEER EXPENSES 54202 MAJOR CRIME INVESTIGATIONS 52301 PROPERTY TAX ADMIN FEE 54203 RECRUITMENT
52304 LAFCO FEES AND PROP TAX EXP 54320 SOFTWARE
52500 TRUSTEE FEES 54330 COMPUTER AND TECHNOLOGY
52510 ADVERTISING & PROMOTION 54500 EQUIP RENTS AND LEASES 52515 ADVERTISING & PUBLICATION 54700 FINES & PENALTIES 52521 LIABILITY INSURANCE PREMIUM 55100 TELEPHONE
52522 LIABILITY & PROPERTY DEDUCT 55200 PG&E
52524 PROPERTY INSURANCE PREMIUM 55210 UTILITIES
52525 WORKER'S COMP. EXPENSE 56100 VEHICLE & EQUIPMENT MAINT. & R 52526 REMIF ASSESSMENT PAYMENTS 56112 EQUIPMENT PARTS FOR RESALE 52527 A.D.P. PREMIUM & DEDUCTIBLE 56120 EQUIPMENT MAINTENANCE & REPAIR 52528 LIABILITY INSURANCE 56125 LAB EQUIP-REPAIR & MAINT. 52529 EARTHQUAKE & FLOOD (DIC) 56130 EXTERNAL SERVICES
52532 SAFETY & TRAINING SUPPORT 56210 FUEL & FLUIDS
52533 UVFA RETIREE HEALTH INS 56300 BUILDING MAINT. & REPAIR 52600 RENT 56410 EQUIPMENT RENTAL - PRIVATE
52601 DATA STORAGE & CONNECTIVITY 56504 FACILITY MAINTENANCE & REPAIR 52602 RENTAL OF CITY PROPERTY 56600 AIRFIELD MAINTENANCE & REPAIR 52841 SUCCESSOR AGENCY ADMIN 57100 LEARNING AND DEVELOPMENT 53000 LAWSUIT SETTLEMENT 57101 CONF & TRAINING-AQUATICS 54100 SUPPLIES 57300 MEMBERSHIPS & SUBSCRIPTIONS
Object Code Summary Attachment 3
58101 NCPA PLANT GENERATION
58102 NCPA POWER PURCHASES
58103 NCPA TRANSMISSION
58104 NCPA MANAGEMENT SERVICES
58105 NCPA THIRD PARTY SALES
58202 CHEMICALS
58401 AVIATION FUEL
58410 GARAGE LUBRICANTS & PARTS
58510 REIMBURSABLE JOBS
59100 PROPERTY TAXES PAID
59101 FEES
59102 FRANCHISE FEES
59105 CONTRIBUTIONS TO OTHER AGENCY
59106 SENIOR TRASH SUBSIDY
59108 BANK FEES
59400 OTHER EXPENSES
59500 LOANS ISSUED
59502 SCHOLARSHIPS
61200 PURCHASING ALLOCATION
61300 BILLING & COLLECTION ALLOCATIO
61410 RENT ALLOCATION
61420 BUILDING MAINTENANCE ALLOCATIO
61422 IT ALLOCATION
61430 CORP YARD ALLOCATION
61500 INSURANCE ALLOCATION
61600 GARAGE ALLOCATION
61700 DISPATCH
62100 ADMIN & OVERHEAD ALLOCATION
63000 INTERFUND SERVICES USED
70101 LOAN PAYMENTS MADE
70102 BOND INTEREST EXPENSE
70103 LOAN INTEREST
70201 LOAN PRINCIPAL PAYMENTS
70202 BOND PRINCIPAL PAYMENTS
74500 CAPITAL LEASE PRINCIPAL
74501 CAPITAL LEASE INTEREST
80100 MACHINERY & EQUIPMENT
80210 LAND ACQUISITION
80220 BUILDING IMPROVEMENTS
80230 INFRASTRUCTURE
90100 LOAN PROCEEDS
90101 LOAN PAYMENT RECEIVED
Corrected 6-13-22 ATTACHMENT 4
Agenda Item No: 7.b.
MEETING DATE/TIME: 6/15/2022
ITEM NO: 2022-1721
AGENDA SUMMARY REPORT
SUBJECT: Award Three-Year Contract to Evergreen Job and Safety Training in the Amount of $84,012.00 to Provide Job and Safety Training for Electric Utility Employees.
DEPARTMENT: Electric Utility PREPARED BY: Cindy Sauers, Electric Utility Director PRESENTER: Cindy Sauers, Electric Utility Director
ATTACHMENTS:
1. Ukiah - 2022 - 3 year Proposal
Summary: The Council will consider awarding a three-year contract to Evergreen Job and Safety Training in the amount of $84,012.00.
Background: Operational and safety training is required as mandated by California Title 8 High Voltage Electrical Safety Orders for Electric Utility employees.
The safety training for Electric Utility employees includes twelve (12) training sessions per year that cover the following areas: Capacitors and System Protection, Excavations and Mechanical Equipment, Transformers and Electrical Theory, Fall Protection –Classroom and In The Field Training (50%-50%), Substations, Underground Residential Distribution, Heat Illness and Overhead Lines, Electrical Burns and Personal Protective Equipment (PPE), Emergency Rescue Procedures (E.R.P.) Pole Top and Bucket Truck Rescue, Grounding/Lock-out Tag-out Procedures (per City Policy), Hearing Conservation, Hot Sticks and Grounds Testing, Meter Safety, Rubber Glove Re-Certification, Confined Space and Energized Parts, Job Briefings and Fork Lift Re-Certification, and Live Line Tools.
Discussion: In the Ukiah area, resources for these services, especially those that cover this wide range of training topics, are limited. Staff researched Job and Safety Training providers as well as reaching out to other municipalities with Electrical Utilities to get information on how they provide the required training for their crews. A list of potential companies was shared and those companies were contacted only to find out they could not provide the requested curriculum or did not do on-site training.
This training is an essential part of the electric utility trade to ensure safe work practices and procedures are adhered to in this hazardous field. Monthly refreshers help keep our employees cognizant while working in close proximity to high voltage lines.
Evergreen Job and Safety Training submitted a proposal. The cost for the requested trainings is $2,303.00 per month for monthly trainings for years one and two, with a 4% increase in year three, for a revised amount of $2,395.00 per month. Evergreen's proposal was reviewed and found acceptable, and is provided as Attachment 1. The cost for the Electric Utility employee safety training will be $27,636.00 per year for the first two years and $28,740.00 for year three, resulting in a total contract amount of $84,012.00 for a three-year period.
Staff recommends a three-year contract for Job and Safety Training be awarded to Evergreen Job and Safety Training for the amount of $84,012.00. Funds for the first year have been budgeted and are available in FY 2022/2023 in account 80026110.52100. Years two and three will be subject to budget approval in future fiscal years.
Recommended Action: Award Three-Year Contract to Evergreen Job and Safety Training in the Amount of $84,012.00 to Provide Job and Safety Training for Electric Utility Employees.
BUDGET AMENDMENT REQUIRED: No
CURRENT BUDGET AMOUNT: 80026100.52100: $28,000 (Subject to Council's adoption of 22/23 Fiscal Year Budget)
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: Electric Fund
PREVIOUS CONTRACT/PURCHASE ORDER NO.: 1920107
COORDINATED WITH: Tim Santo, Electric Superintendent
Evergreen Job & Safety Training, Inc.
1352 Palmerston Loop
Roseville, CA 95678
Office: (916) 742-1811
Fax: (916) 742-1852
[email protected]
City of Ukiah
Electric Department
1320 Airport Rd.
Ukiah, CA 95482
Re: Contract Proposal: July 1, 2022 – June 30, 2025 – 3 Year Term To Whom It May Concern,
I appreciate the opportunity to present you with this proposal. As your training instructor, I will be dedicated to providing you with the best possible service to meet the specific needs of the City of Ukiah Electric Department. This proposal is based on 12 programs per year, with a price per meeting of $2,303.00 for the first and second years, with a 4% increase for the third year at $2,395.00 per meeting. The total fee for all three years combined would be $84,012.00 Year One: $2,303.00 per meeting (12 meetings)
Year Two: $2,303.00 per meeting (12 meetings)
Year Three: $2,395.00 per meeting (12 meetings)
Total Fees for 3 year term of contract: $84,012.00
This proposal includes all of my expenses, including but not limited to; administration, record keeping, program development, travel, lodging and meals. Certain additional training materials, such as CPR/First Aid and Traffic Control materials will be billed to you at my cost. I will discuss the cost of these materials prior to supplying any of them to your employees.
If this proposal meets your approval, I will proceed with addressing any additional contract requirements you have, in addition to providing you a course schedule for upcoming year. This proposal is a firm, irrevocable offer 90 days. Furthermore, I will comply with the insurance requirements for the City of Ukiah. I look forward to serving you in this capacity. Please contact me if you have any questions.
Sincerely,
Jesse Langslet
Jesse Langslet
Owner/Instructor
ATTACHMENT 1
Agenda Item No: 7.c.
MEETING DATE/TIME: 6/15/2022
ITEM NO: 2022-1732
AGENDA SUMMARY REPORT
SUBJECT: Adoption of Resolution of the City Council Reconsidering the Circumstances of the State of Emergency and Implementing Teleconferencing Requirements for City Council and Board and Commission Meetings During a Proclaimed State of Emergency Due to the COVID-19 Pandemic.
DEPARTMENT: City Attorney PREPARED BY: Darcy Vaughn, Assistant City Attorney PRESENTER: Consent Calendar
ATTACHMENTS:
1. AB 361 Findings Reconsideration for All Legislative Bodies Summary: The City Council will consider adopting a resolution reconsidering the circumstances of the state of emergency and implementing teleconferencing requirements for public meetings of the Council and all City Commissions and Boards during the current state of emergency due to the COVID-19 pandemic.
Background: The City Council is being asked to consider adopting a resolution authorizing continued remote meetings of the Council and its subordinate legislative bodies due to the imminent risk to the health and safety of attendees due to possible transmission of COVID-19 and the recent spread of variants. The current County health orders strongly recommends masking in all indoor facilities due to health and safety concerns. COVID19 is highly transmissible in indoor settings and requires multi-component prevention strategies to reduce its spread. The California Department of Public Health is currently investigating the length of vaccine protection.
The Center for Disease Control and Prevention recommends avoiding indoor spaces that do not offer fresh air from the outdoors as much as possible. Returning to meeting in the Council Chambers or smaller conference rooms means being in an enclosed space for meetings that commonly last for one to five hours and would seem to create additional exposure for participants to a possible transmission of the virus.
The Ralph M. Brown Act (“Brown Act”) requires that all meetings of a legislative body of a local agency be open and public and that any person may attend and participate in such meetings. The Brown Act allows for legislative bodies to hold meetings by teleconference, but imposes specific requirements for doing so, including allowing public access to that location. On March 17, 2020, in order to address the need for public meetings during the COVID-19 pandemic, Governor Newsom issued Executive Order No. N-29-20, temporarily suspending the Brown Act’s teleconferencing requirements, Executive Order No. N-8-2 then continued the suspension of the Brown Act’s teleconferencing requirements from June 11, 2021 through September 30, 2021. These Executive Orders allowed legislative bodies to meet virtually as long as certain notice and accessibility requirements were met.
The State Legislature amended the Brown Act through Assembly Bill No. 361 (“AB 361”) on September 16, 2021. As with the Executive Orders, AB 361 requires that certain notice and accessibility requirements continue to be met for holding virtual public meetings. In addition, AB 361 states that a local agency may use teleconferencing without complying with the regular teleconferencing requirements of the Brown Act, where the legislative body holds a meeting during a proclaimed state of emergency and makes certain findings; and requires that the legislative body make additional findings every 30 days in order to continue such teleconferencing.
As such, Staff recommends that the Council reconsider the circumstances of the state of emergency, and make findings regarding the state of emergency by adopting the Resolution Implementing Teleconferencing
Requirements for City Council and Board and Commission Meetings During a Proclaimed State of Emergency Due to the COVID-19 Pandemic (“Resolution”) attached here as Attachment 1.
Discussion: AB 361, codified in part in Government Code § 54953, allows a local agency legislative body to hold a public meeting utilizing teleconferencing without giving public access to a teleconference location but allowing public comment virtually if the Governor has proclaimed a State of Emergency and any of the following circumstances also apply:
1. State or local officials have imposed or recommended measures to promote social distancing.
2. The meeting is being held for the purposes of determining, by majority vote, whether as a result of the emergency, meeting in person would present imminent risks to the health or safety of attendees.
3. The legislative body has determined that as a result of the emergency, meeting in person would present imminent risks to the health or safety of attendees.
As amended by AB 361, Government Code § 54953(e)(3) requires cities that are conducting public meetings via teleconferencing during a declared State of Emergency to make findings, within 30 days of the first virtual meeting after AB361 going into effect, and every 30 days thereafter, that the legislative body has reconsidered the circumstances of the state of emergency and either 1) the emergency continues to impact the ability to meet safely in person, and/or 2) State or local officials continue to impose or recommend social distancing.
Council adopted these findings at their May 18, 2022 meeting. The Council must now adopt, via this Resolution (Attachment 1), the findings that confirm the circumstances of the state of emergency and justify holding public meetings of the Council and all subordinate commissions, boards, and committees utilizing teleconferencing and allowing public comment virtually, pursuant to Government Code § 54953(e)(3).
Given recent modifications to the health order, Staff is currently utilizing and fine-tuning a hybrid meeting option that allows for in-person and remote participation in an effort to accommodate all needs and choices.
Staff will be working with the Mayor to coordinate continued implementation.
Recommended Action: Adopt a Resolution of the City Council Reconsidering the Circumstances of the State of Emergency and Implementing Teleconferencing Requirements for City Council and Board and Commission Meetings during a Proclaimed State of Emergency Due to the COVID-19 Pandemic.
BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: City Clerk
1 RESOLUTION NO. 2022-XX
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UKIAH IMPLEMENTING
TELECONFERENCING REQUIREMENTS FOR CITY COUNCIL AND BOARD AND
COMMISSION MEETINGS DURING A PROCLAIMED STATE OF EMERGENCY DUE TO THE COVID-19 PANDEMIC
WHEREAS:
1. The City of Ukiah is committed to preserving and nurturing public access and participation in meetings of the City Council and its Boards and Commissions; and
2. All meetings of City’s legislative bodies are open and public, as required by the Ralph M.
Brown Act, so that any member of the public may attend, participate, and watch the City’s legislative bodies conduct their business;
3. The Brown Act allows for legislative bodies to hold meetings by teleconference, but imposes specific requirements for doing so; and
4. On March 17, 2020, in order to address the need for public meetings during the present public health emergency, i.e. the COVID-19 Pandemic, Governor Newsom issued Executive Order No. N-29-20, suspending the Act’s teleconferencing requirements; and
5. On June 11, 2021, Governor Newsom issued Executive Order No. N-8-21, continuing the suspension of the Brown Act’s teleconferencing requirements through September 30, 2021; and
6. The State Legislature amended the Brown Act through Assembly Bill No. 361 (AB 361) on September 16, 2021; and
7. AB 361, codified in part at Government Code section 54953(e), makes provisions for remote teleconferencing participation in meetings by members of a legislative body, without compliance with the requirements of Government Code section 54953(b)(3), subject to the existence of certain conditions; and
8. Such conditions now exist in the City, specifically, the Governor has proclaimed a state of emergency exists for the state of California due to the conditions caused by the COVID-19 pandemic and the impact on the health and safety of its residents; and
9. The Delta variant is highly transmissible in indoor spaces, the California Department of Public Health is currently investigating how long vaccine protection lasts, and the Center for Disease Control and Prevention recommends avoiding indoor spaces that do not offer fresh air from the outdoors;
10. Current County health orders impose or measures to promote social distancing due to health and safety concerns; and
2 11. In accordance with Assembly Bill 361, the City Council does hereby find that as a result of the emergency, meeting in person would present imminent risks to the health or safety of attendees and the Council desires to authorize continued remote teleconferenced meetings of its legislative bodies; and
12. As a consequence of the local emergency, the City Council does hereby find that the legislative bodies of the City shall conduct their meetings without compliance with Government Code § 54953(b)(3), as authorized by § 54953(e), and that such legislative bodies shall comply with the requirements to provide the public with access to the meetings as prescribed in § 54953(e)(2); and
13. The City has taken measures to conduct public meetings via virtual tools that allow members of its legislative bodies and members of the public to join and participate in meetings remotely and provide public testimony in the virtual environment and via teleconference.
NOW, THEREFORE, the City Council for the City of Ukiah hereby finds, determines, declares, orders, and resolves as follows:
1. That the foregoing recitals are true and correct and incorporates them by this reference; and
2. The Governor of the State of California issued a Proclamation of State of Emergency, which remains in effect; and
3. County of Mendocino officials have imposed or recommended measures to promote social distancing; and
4. Meeting in person would present imminent risk to the health or safety of attendees; and
5. The City Council of the City of Ukiah has reconsidered the circumstances of the State of Emergency, and finds that:
a. The factors triggering the State of Emergency continue to directly impact the ability of the members of the legislative bodies of the City of Ukiah, their staff, and members of the public to meet safely in person; and
b. State and County officials continue to impose or recommend measures to promote social distancing.
6. The City Manager or his designee and the legislative bodies of the City of Ukiah are authorized to take all steps and perform all actions necessary to execute and implement this Resolution in compliance with Government Code § 54953; and
7. This Resolution shall take effect immediately upon its adoption and shall be effective until the earlier of (i) July 15th, 2022, or (ii) such time the City Council adopts a subsequent resolution in accordance with Government Code section 54953(e)(3) to extend the time during which the legislative bodies of the City may continue to teleconference without compliance with paragraph (3) of subdivision (b) of § 54953(b)(3).
PASSED AND ADOPTED this 15th day of June, 2022, by the following roll call vote:
3 AYES:
NOES:
ABSENT:
ABSTAIN:
Jim O. Brown, Mayor
ATTEST:
Kristine Lawler, City Clerk
Agenda Item No: 7.d.
MEETING DATE/TIME: 6/15/2022
ITEM NO: 2022-1741
AGENDA SUMMARY REPORT
SUBJECT: Receive Annual Report Regarding the City of Ukiah's Electric Utility Wildfire Mitigation Plan in Response to Senate Bill 901.
DEPARTMENT: Electric Utility PREPARED BY: Cindy Sauers, Electric Utility Director PRESENTER: Cindy Sauers, Electric Utility Director
ATTACHMENTS:
1. Ukiah's Wildfire Mitigation Plan_Revision 3_06-15-22
2. Ukiah's Wildfire Mitigation Plan_Revision 3_redline
Summary: Council will receive the annual report regarding the Electric Utility's Wildfire Mitigation Plan.
Background: In response to catastrophic wildfires in California, Senate Bill 901 was passed in 2018 requiring California utilities to prepare a Wildfire Mitigation Plan (WMP), have the plan independently reviewed and submit the plan to the State. Utilities are required to update and resubmit the plan annually.
On December 4, 2019, Council approved the Utility's first WMP and received a report on the revision that resulted from the independent third party review on June 17, 2020.
Discussion: Ukiah's WMP (Attachment 1) addresses the range of activities that the Electric Utility is taking to minimize the sources of ignition and improve the resiliency of the electric grid. The WMP outlines eight strategies that the Utility is using to mitigate wildfires:
Vegetation Management
Enhanced Inspections
Situational Awareness
Operational Practices
System Hardening
Public Safety and Notification
Reclosing and De-energization
Wildfire Response and Recovery
Changes to this revision of the WMP include increased vegetation clearing in areas that are bordering or close to the western hills, modifications to key personnel and the roles they play in the implementation of the plan, and minor grammatical changes. A redlined copy of the WMP is included for Council's review (Attachment 2).
Recommended Action: Receive annual report regarding the City of Ukiah's Electric Utility Wildfire Mitigation Plan in response to Senate Bill 901.
BUDGET AMENDMENT REQUIRED: No
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: Tami Bartolemei, Emergency Management Coordinator
Ukiah Electric Utility
WILDFIRE
MITIGATION
PLAN
December 4, 2019
Revision 1 - June 17, 2020
Revision 2 – December 16, 2020
Revision 3 – June 15, 2022
ATTACHMENT 1
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 2
TABLE OF CONTENTS
1. OVERVIEW - WILDFIRE MITIGATION PLAN............................................................. 4 A. POLICY STATEMENT.......................................................................................... 4 B. PURPOSE ....................................................................................................................4 C. ORGANIZATION .................................................................................................. 5 D. DEFINITIONS AND ACRONYMNS …………………………………………... 5
2. OBJECTIVES OF THE WILDFIRE MITIGATION PLAN .............................................. 6 A. MINIMIZING SOURCES OF IGNITION ............................................................. 6 B. RESILIENCY OF THE ELECTRIC GRID............................................................ 6 C. WILDFIRE PREVENTION STRATEGIES & PROGRAMS................................ 6 D. IDENTIFYING UNNECESSARY OR INEFFECTIVE ACTIONS ...................... 8
3. ROLES AND RESPONSIBILITIES................................................................................... 9 A. GOVERNANCE STRUCTURE............................................................................. 9 B. ROLES AND RESPONSIBILITIES FOR PLAN EXECUTION........................... 9 C. COORDINATION WITH JOINT POLE INFRASTRUCTURE PROVIDERS..... 9 D. COORDINATION WITH CITY OF UKIAH DEPARTMENTS......................... 10 E. CAL OES STANDARDIZED EMERGENCY MANAGEMENT SYSTEM ...... 11
4. WILDFIRE RISK AND RISK DRIVERS........................................................................ 12 A. BACKGROUND................................................................................................... 12 B. ENTERPRISE SAFETY AND WILDFIRE RISK METHODOLOGY ............... 12 C. SYSTEM AND OPERATIONAL RISK .............................................................. 12 D. GEOGRAPHICAL & CLIMATE RISK............................................................... 13 E. CPUC HIGH FIRE THREAT DISTRICTS.......................................................... 13
5. WILDFIRE PREVENTION STRATEGY AND PROGRAMS ....................................... 13 A. STRATEGY – VEGETATION MANAGEMENT............................................... 13 B. STRATEGY - ENHANCED INSPECTIONS ...................................................... 15 C. STRATEGY - SITUATIONAL AWARENESS................................................... 15 D. STRATEGY - OPERATIONAL PRACTICES .................................................... 15 E. STRATEGY - SYSTEM HARDENING .............................................................. 16 F. STRATEGY - PUBLIC SAFETY AND NOTIFICATION.................................. 16 G. STRATEGY - RECLOSING AND DEENERGIZATION................................... 17 H. STRATEGY - WILDFIRE RESPONSE & RECOVERY .................................... 17 I. PROGRAM – UEU WILDFIRE PREVENTION PROGRAM……………….... 17 J. PROGRAM – UEU 5-YEAR CAPITAL IMPROVEMENT PLAN.................... 17
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 3
K. PROGRAM – COU EMERGENCY OPERATIONS PLAN................................ 17
6. COMMUNITY OUTREACH AND EDUCATION ......................................................... 18
7. RESTORATION OF SERVICE ....................................................................................... 18
8. EVALUATION OF THE PLAN...........................................................................................19 A. METRICS FOR MEASURING PLAN PERFORMANCE .................................. 19 B. IMPACT OF METRICS ON PLAN ..................................................................... 20 C. MONITORING AND AUDITING THE PLAN................................................... 20 D. IDENTIFYING AND CORRECTING DEFICIENCIES IN THE PLAN ............ 21 E. MONITORING THE EFFECTIVENESS OF INSPECTIONS............................ 21
9. INDEPENDENT AUDITOR............................................................................................ 21
10. APPENDICIES…………………………………………………………………………..22
A. WILDFIRE PREVENTION PROGRAM……………………………………….22
11. EXHIBITS
A. CPUC FIRE THREAT MAP
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 4
1. OVERVIEW
A. POLICY STATEMENT
Ukiah Electric Utility has been operating its electric system for over one-hundred years. Public and employee safety is paramount in the operation, construction and maintenance of the electric system. Given recent, catastrophic wildfires in California, the state passed Senate Bill (SB) 901 in September 2018. The law requires utilities to prepare wildfire mitigation measures if the utility’s overhead electrical lines and equipment are located in an area that has a significant risk of wildfire resulting from those electrical lines and equipment. The law requires the wildfire mitigation measures to incorporate specific information and procedures and requires the local publicly owned electric utility, before January 1, 2020, and annually thereafter, to prepare a wildfire mitigation plan. Portions of Ukiah Electric Utility’s (UEU) electrical infrastructure is located in and adjacent to California Public Utilities Commission (CPUC) designated Tier 2 wildfire threat areas.
UEU’s overarching goal is to provide safe, reliable, and economic electric service to its local community. In order to meet this goal, UEU constructs, maintains, and operates its electrical lines and equipment in a manner that minimizes the risk of catastrophic wildfire posed by its electrical lines and equipment.
B. PURPOSE OF THE WILDFIRE MITIGATION PLAN
This Wildfire Mitigation Plan (WMP) describes the range of activities that UEU is taking or considering, to mitigate the threat of power-line ignited wildfires, including its various programs, policies, and procedures. This plan complies with the requirements of Public Utilities Code section 8387 for publicly owned electric utilities to prepare a wildfire mitigation plan by January 1, 2020, and annually thereafter. The Plan will be iterative, promote continuous improvement year-overyear, and represent best efforts to implement industry best practices in a prudent and reasonable manner.
UEU is a department within the City of Ukiah. For wildfire prevention and response, UEU is subordinate to the Ukiah Valley Fire Authority (UVFA) and the City of Ukiah Police Department (UPD).
The City of Ukiah adopted an Emergency Operations Plan (EOP) in 2021 and the Building Community Preparedness and Resilience Program in 2019. The UEU Wildfire Mitigation Plan supports the aspirational goals of these plans in the area of Wildland Fire. The objectives of the Plans specifically supported by this UEU Wildfire Mitigation Plan are as follows:
1. Educate the public about wildland fire dangers and the steps that can be taken to prevent or minimize their effects.
2. Maintain Emergency Operations Center for coordination of information and resources.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 5
3. Reduce the potential for destructive actions of the fire should ignition occur, utilizing fire preplans, ensuring a properly trained, staffed, and equipped emergency response capability, and timely response to prevent the spread of the fire, minimizing risks to humans and property.
4. Ensure that adequate resources are available to plan for incidents that may occur in the high fire hazard severity zones within the City of Ukiah.
C. ORGANIZATION OF THE WILDFIRE MITIGATION PLAN
This Wildfire Mitigation Plan includes the following elements:
Section 2 - Objectives of the Plan;
Section 3 - Roles and responsibilities for carrying out the Plan; Section 4 - Identification of key wildfire risks and risk drivers; Section 5 - Description of wildfire prevention, mitigation, and response strategies and programs; Section 6 - Community outreach and education;
Section 7 - Restoration of service following a wildfire; Section 8 - Metrics for evaluating the Performance of the WMP and identifying areas for improvement;
Section 9 - Independent audit of the Plan.
D. DEFINITIONS AND ACRONYMNS
a. COU or City – City of Ukiah
b. CPUC - California Public Utilities Commission is a regulatory agency that regulates privately owned public utilities in California.
c. ICS – Incident Command System is a standardized approach to the command, control and coordination of emergency response.
d. IR – Infrared technology that uses thermography to recognize hot spots in electrical equipment.
e. EOP – Emergency Operations Plan is a City Plan, formerly known as the Multi Hazard Emergency Response Plan that establishes communication, facilitates collaboration and ensures compliance with local, state and federal emergency management agencies. f. LIDAR – Light detection and ranging is a remote sensing technology that uses light in the form of a pulsed laser to measure distances.
g. MTA – Mendocino Transit Authority
h. OES – Mendocino County Sheriff’s Office of Emergency Services i. SCADA – Supervisory Control and Data Acquisition is a computer system for gathering and analyzing real time data.
j. UEU – Ukiah Electric Utility.
k. UPD – Ukiah Police Department.
l. UVFA – Ukiah Valley Fire Authority.
m. WMP – Wildfire Mitigation Plan refers to this plan as ordered by Senate Bill 901.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 6
2. OBJECTIVES OF THE WILDFIRE MITIGATION PLAN
A. MINIMIZING SOURCES OF IGNITION
The primary goal of this WMP is to minimize the probability that UEU’s transmission and distribution system may be the origin or contributing source for the ignition of a fire as well as to protect the system from wildfire damage.
UEU is in the process of evaluating prudent and cost-effective improvements to its physical assets, operations, and training to help meet this objective. UEU will implement these changes consistent with this WMP as staffing and budget allows.
B. RESILIENCY OF THE ELECTRIC GRID
The secondary goal of this WMP is to improve the resiliency of the electric grid. As part of the development and on-going implementation of this plan, UEU will assess new industry practices and technologies that will reduce the likelihood of an interruption (frequency) in service and improve the restoration of service.
Other resiliency efforts include mitigating fire fuels in areas that are a threat to our facilities and equipment along with reducing the chance that lives or property will be lost to wildfire.
Additionally, improved fire coordination will improve resiliency and help avoid the need for public safety power shut off protocols during high fire threat weather. Fire fuels reduction and improved fire response will be addressed in the UEU Wildfire Prevention Program.
C. WILDFIRE PREVENTION STRATEGIES & PROGRAMS
1. Strategies
The following strategies are part of this Plan and described in more detail in Section 5. • VEGETATION MANAGEMENT
These strategies help to control vegetation near to UEU overhead transmission and distribution lines so they better adhere to clearance specifications. They also include fire fuels mitigation and other work in order to prevent our system from causing a fire and to protect our system from fire.
• ENHANCED INSPECTIONS
These strategies consist of assessment and diagnostic activities as well as associated corrective actions. The practices in this category aim to ensure all infrastructure is in working condition and vegetation adheres to defined minimum distance specifications. • SITUATIONAL AWARENESS
These strategies consist of methods to improve system visualization and awareness of environmental conditions. The practices in this category aim to provide tools to improve the other components of the plan.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 7
• OPERATIONAL PRACTICES
These strategies consist of proactive, day-to-day actions taken to mitigate wildfire risks.
The practices in this category aim to ensure UEU is prepared in high-risk situations, such as dry, windy environmental conditions.
• SYSTEM HARDENING
These strategies consist of system, equipment, and structure design and technical upgrades.
The practices in this category aim to improve system hardening to prevent contact between infrastructure and fuel sources, such as vegetation and animals. It also includes making the system more resilient to wildfire and other disasters.
• PUBLIC SAFETY AND NOTIFICATION
These strategies will focus on ways to engage the community as partners in preventing and identifying wildfire risk. They include improving outage notification and other items in the interest of public safety.
• RECLOSING AND DEENERGIZATION
These strategies include discussion of de-energization as well as circuit reclosing. • WILDFIRE RESPONSE & RECOVERY
These strategies consist of procedures to react to wildfire or other related emergency conditions. The practices aim to formalize protocols for these situations, so UEU can provide an adequate response and recovery.
2. Programs
The strategies above will, as budgetary constraints and staffing permit, be developed and implemented through the following programs that are either active or are being created and coordinated as part of this WMP and are described in more detail in Section 5. • UEU Wildfire Prevention Program - Appendix A
• UEU Distribution Capital Improvement Program
• COU Emergency Response Plan (EOP)
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 8
UEU Wildfire Prevention Strategies and Program Matrix
Wildfire
Prevention Plan
5-year Capital
Improvement Plan COU EOP
Vegetation
Management
x
Enhanced
Inspections
x x
Situational
Awareness
x x
Operational
Practices
x x
System
Hardening
x
Public Safety &
Notification
x x
Reclosing &
De-energization
x x x
Wildfire
Response &
Recovery
x x
D. IDENTIFYING UNNECESSARY OR INEFFECTIVE ACTIONS
The final goal for this WMP is to measure the effectiveness of specific wildfire mitigation strategies.
UEU will assess the merits of modifications. This plan will also help determine if more costeffective measures would produce the same or improved results.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 9
3. ROLES AND RESPONSIBILITIES
A. UEU GOVERNANCE STRUCTURE
This WMP is subject to the direct supervision by the Ukiah City Council (Council), and will be implemented by the UEU Director (“Director”). The City of Ukiah, a general law city, has a City Council - manager form of governance. The City Council is the Utility Commission for UEU.
B. ROLES AND RESPONSIBILITIES FOR PLAN EXECUTION
Executive Level Responsibility: The Director will oversee implementation and ensure that staff follow procedures and protocols. The Assistant Director will manage the execution of performance monitoring. This includes providing guidance to staff and leading the development of reports. The staff responsible for each metric area will aggregate relevant metrics at the direction of the Assistant Director.
1. Program Owners: The table below outlines the current assignments and are subject to change.
Program Owner
UEU Wildfire Prevention
Program
COU Fire Marshal’s Office and UEU
Director
UEU Distribution Capital
Improvement Program
UEU Director
COU EOP COU Office of Emergency
Management Coordinator
Ukiah City Council
City Attorney City Manager
UEU
Director
Utility
Operations
Technical
Services Resources
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 10
2. Strategy Leads: The table below outlines the proposed assignments and are subject to change.
Strategy Lead Personnel Key Technical Personnel
Vegetation Management Electric Superintendent Senior Electrical Engineer Enhanced Inspections Electric Superintendent
Electrical Technicians
Senior Electrical Engineer
Electric Superintendent
Foreman
Electrical Technicians
Situational Awareness EU Director Senior Electrical Engineer Electric Superintendent
Operational Practices Senior Electrical
Engineer Electric Superintendent
System Hardening Senior Electrical
Engineer
Senior Electrical Engineer
Electric Superintendent
Public Safety & Notification EU Director EU Program Coordinator Management Analyst
Reclosing & De-energization Senior Electrical
Engineer
Senior Electrical Engineer
Electric Superintendent
Foreman
Wildfire Response &
Recovery Electric Superintendent
COU Fire Chief
Senior Electrical Engineer
Line Foremen
C. COORDINATION WITH JOINT POLE INFRASTRUCTURE
PROVIDERS
For joint pole fire prevention, UEU takes the lead role and informs the subordinate providers when UEU identifies any compromised poles due to third-party attachments. UEU coordinates with communication and electric infrastructure providers throughout the year when work on the system effects their equipment and identifies safety issues. If UEU staff discovers a facility in need of repair owned by an entity, UEU may issue a notice to repair to the facility owner and work to ensure that necessary repairs are promptly completed. During emergencies, UEU assumes the primary role and informs providers when there is damage or risk to their equipment.
D. COORDINATION WITH CITY OF UKIAH DEPARTMENTS
Ukiah Valley Fire Authority
The Ukiah Valley Fire Authority is the lead agency in cooperation with UEU for implementation of the UEU Wildfire Prevention & Improved communication Program. UVFA is the City’s lead for emergency operations and directs UEU regarding public safety priorities.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 11
Ukiah Police Department
UEU coordinates with UPD and is subordinate for emergency and public safety issues. UEU will work closely with the UPD for situational awareness and other public safety issues related to this WMP.
Ukiah Public Works Department
UEU is investigating opportunities to harden the electrical system and increase survivability for traffic control, water and wastewater infrastructures. During wildfires and other public safety events, UEU closely will work with Public Works to ensure water/wastewater facilities and other critical infrastructure have power. These facilities are not only critical for defending the City from wildfire, but are essential for safe repopulation following any disaster. Additionally, the Mendocino Transit Authority (MTA) is a critical operation for evacuations during emergencies and will be part of planning and operational review process.
Ukiah Community Services Department
UEU is partnered with the COU Community Services Department as part of the UEU Wildfire Prevention Program for fire fuels mitigation as well as other programs and projects.
Other COU Departments and Administration
UEU, as a member of the City of Ukiah Team, will work to ensure information regarding warnings, alerts, and widespread outages are shared with other departments. The City’s Communications Team will be an integral part of getting information out to the media and public and will be coordinated with either and/or both the City’s Emergency Management Coordinator as well as any Incident Command in place.
E. CAL OES STANDARDIZED EMERGENCY MANAGEMENT SYSTEM
As a utility department of the COU located in Mendocino County, UEU may participate in various emergency operation centers depending on the situation and lead agency. As a local governmental agency, COU has planning, communication, and coordination obligations pursuant to the California Office of Emergency Services’ Standardized Emergency Management System (“SEMS”) Regulations, adopted in accordance with Government Code section 8607. The SEMS Regulations specify roles, responsibilities, and structures of communications at five different levels: field response, local government, operational area, regional, and state. The COU maintains a EOP that includes UEU. The COU works closely with Mendocino County to coordinate emergency operations, including the Mendocino County Sherriff’s Office of Emergency Services (OES).
The Mendocino County Sheriff's Office of Emergency Services (OES) coordinates with Federal, State, and local agencies to prepare, respond, and recover from emergencies and natural disasters. • OES is responsible for maintaining and updating the County Multi Hazard Mitigation Plan, which is an all hazards plan for Mendocino County.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 12
• OES also coordinates and maintains the county Emergency Operation Center (EOC). The EOC can be used during a major incident to carry out the principles of emergency preparedness and emergency management between multiple agencies. • The Office of Emergency Services provides technical advice to the Sheriff on local emergency declarations and his direct link to the California Governor's Office of Emergency Services during disasters or any other critical incident. In the event of a major incident OES can work with CAL OES to obtain a Presidential proclamation. • OES works closely with other local agencies assisting them in preparing emergency plans and in disaster training. OES works as a point of contact for local agenciesto the California Governor's Office of Emergency Services.
Pursuant to this structure, UEU coordinates and communicates with the relevant local, state and Federal agencies. This includes participating in City & County EOC exercises as well as providing annual safety meetings. Pursuant to the Emergency Operations Program, an UEU EOC Liaison will participate in the City or County EOC using the standardized Incident Command System (ICS).
4. WILDFIRE RISK AND RISK DRIVERS
A. BACKGROUND
Ukiah typically experiences cool, wet winters and hot, dry summers creating extreme fire weather conditions especially from May through October. Daily temperatures during fire seasons (JuneOctober) can be above 90° Fahrenheit with a relative humidity of less than 30%. Typical vegetation within UEU’s service territory include various types of trees including redwood, oak, pine and fir trees as well as annual grasses. Areas of dense brush and annual grasses are present, and result in high fire danger and significant fires especially during wind events. These conditions combine to create extreme fire danger. The risk of catastrophic wildfire in the area increases as the recent trend of drought conditions continue.
B. ENTERPRISE SAFETY AND WILDFIRE RISK METHODOLOGY
In order to ascertain the level of risk to our system, staff looked at our historic outages caused by animals, birds, vegetation, car-pole accidents, and overhead equipment failures as a way to assess wildfire risk. These events were selected because such events can create circumstances such as wire down or sparking that can result in an ignition source. Additionally, UEU will review historic fire records to see if there are other areas of risk that should be addressed.
C. SYSTEM AND OPERATIONAL RISK
UEU’s designs and constructs its electric facilities to meet or exceed the relevant federal, state, or industry standards. UEU uses the CPUC General Order (GO) 95 as a key industry standard for design and construction standards for overhead electrical facilities and, as such, meets or exceeds all applicable standards in GO 95. Additionally, UEU monitors and follows, as appropriate, the National Electric Safety Code.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 13
Risk drivers associated with design, construction, operations, and maintenance, within our 4.3 square mile service territory include CPUC Tier 2 high fire threat areas that account for approximately 10% of UEU’s facilities.
D. GEOGRAPHICAL & CLIMATE RISK
Within UEU’s service territory and the surrounding areas, the primary risk drivers associated with geography and climate for wildfire are the following:
a) Extended drought;
b) Vegetation type;
c) Vegetation density (especially the West side)
d) Weather;
e) High winds;
f) Terrain;
g) Low humidity;
h) Changing weather patterns
i) Community at risk
j) Fire history
E. CPUC HIGH FIRE THREAT DISTRICTS
UEU will incorporate the California Public Utility Commission’s (CPUC) Fire Threat Map (Exhibit A) into its construction, inspection, maintenance, repair, and clearance practices, where applicable.
UEU reviews the CPUC Fire Threat Map annually to identify needed adjustments to hazard threat levels due to changes in urban development and/or vegetation conditions. When adjustments are identified, UEU collaborates with Ukiah Valley Fire Authority and City Departments and CAL FIRE to update the CPUC Fire Threat Map data and UEU’s Fire Threat Map accordingly. The UEU’s Fire Threat Map depicts the highest fire threat known.
5. WILDFIRE PREVENTION STRATEGY AND PROGRAMS
A. STRATEGY – VEGETATION MANAGEMENT
UEU meets or exceeds the minimum industry standard vegetation management practices. For both transmission and distribution level facilities, UEU meets: (1) GO 95 Rule 35; and (2) the GO 95 Appendix E Guidelines to Rule 35 (See table below). These standards require significantly increased clearances in the High Fire Threat areas. In identified high risk areas that boarder or are close to Tier 2 wildfire threat areas, the radial clearance of branches or foliage from bare conductors will be increased to 12’. The recommended time-of-trim guidelines do not establish a mandatory standard, but instead provide useful guidance to utilities. UEU has developed a tree inventory to catalog existing trees and will use specific knowledge of growing conditions and tree species to determine the appropriate time of trim clearance in each circumstance. UEU performs this work with arborists and a contract for tree trimming services as needed. Additionally, vegetation clearing is completed at the base of poles to minimize potential sources of spread.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 14
GO 95
Guidelines to Rule 35
The radial clearances shown below are recommended minimum clearances that should be established, at time of trimming, between the vegetation and the energized conductors and associated live parts where practicable. Reasonable vegetation management practices may make it advantageous for the purposes of public safety or service reliability to obtain greater clearances than those listed below to ensure compliance until the next scheduled maintenance. Each utility may determine and apply additional appropriate clearances beyond clearances listed below, which take into consideration various factors, including: line operating voltage, length of span, line sag, planned maintenance cycles, location of vegetation within the span, species type, experience with particular species, vegetation growth rate and characteristics, vegetation management standards and best practices, local climate, elevation, fire risk, and vegetation trimming requirements that are applicable to State Responsibility Area lands pursuant to Public Resource Code Sections 4102 and 4293.
Voltage of Lines
Radial Clearance of Bare
Line Conductors From
Tree Branches or Foliage
Radial clearances for any conductor of a line operating at 2,400 or more volts, but less than 72,000 volts 4 feet Radial clearances for any conductor of a line operating at 72,000 or more volts, but less than 110,000 volts 6 feet Radial clearances for any conductor of a line operating at 110,000 or more volts, but less than 300,000 volts 10 feet Radial clearances for any conductor of a line
operating at 300,000 or more volts 15 feet
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 15
In addition, UEU Wildfire Prevention Program (Appendix A)will include the following enhancements
• No vertical coverage allowed above UEU transmission lines; • Provide vegetation control in a 30-foot perimeter around the Power Plant and substations conductors.
• For public land, provide easement clear from ground to sky adjacent to UEU facilities; • Work with adjacent customersto get approval for wider clearance on their land. This could include tall, diseased, leaning trees that appear to be at risk of falling into our lines. • Perform additional vegetation removal for fuels reduction in the easement on an annual rotation to ensure CPUC recommended clearances are maintained based on the fire hazard zone where each transmission and distribution line is located; • Consider undergrounding areas where heritage trees are prevalent.
B. STRATEGY - ENHANCED INSPECTIONS
Inspection plays an important role in wildfire prevention. UEU currently follows the inspection cycles outlined in California General Order 95 and General Order 128. UEU’s current inspection activities incorporate several components including annual infrared (IR) patrol of overhead lines and substations, inspection of wood poles, 115 KV lines and GIS data collection and sharing.
Some of the enhancements UEU has implemented the use of unmanned aerial vehicles with IR capability. The frequency of inspections will be increased in the high fire threat areas and when storms or other disasters have significantly impacted our system.
C. STRATEGY - SITUATIONAL AWARENESS
Presently UEU is evaluating to upgrade an automated control management system that can be used during outages. UEU is also investigating advanced metering infrastructure (AMI) technology that has the ability to track customer outages as part of an Outage management System.
Other efforts will include the following technology in collaboration with Ukiah PD and Ukiah Valley Fire Authority.:
• Use unmanned aerial vehicles during high fire threat days for early detection, infrared inspection of hard to reach areas, and other uses in the interest of public safety; • Communication system upgrades for wildfire and disaster response and recovery; D. STRATEGY - OPERATIONAL PRACTICES
UEU will operate the system in a manner that will minimize potential wildfire risks including taking all reasonable and practicable actions to minimize the risk of a catastrophic wildfire caused by UEU electric facilities. UEU will take corrective action for deficiencies when the staff witnesses or is notified of improperly install or maintained fire protection measures. In addition to those general principles, several new operational practices will help reduce the risk of wildfire
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 16
and improve the response time in the event of a fire including:
• During high wildfire, threat periods (red flag warnings) perform only essential work and light work that can be completed while performing observations in areas of concern.
Staff may be placed at Orchard substation and Mendocino Hydroelectric power plant with an electrical technician or lineman, posting linemen in various parts of the city where the fire danger is higher, and having other field personnel patrolling the city. All personnel will directly report to Fire/Police any hazardous observations. All available UEU Staff placed on standby.
• Collect and maintain wildfire and system data necessary for the implementation and evaluation of this Wildfire Mitigation Plan.
E. STRATEGY - SYSTEM HARDENING
UEU’s electric facilities are designed, constructed, and maintained to meet or exceed the relevant federal, state, or industry standard. UEU treats CPUC General Order (GO) 95 as a key industry standard for design and construction standards for overhead electrical facilities. UEU meets or exceeds all standards in GO 95. Additionally, UEU monitors and follows, as appropriate, the National Electric Safety Code. In addition to standards, UEU develops a 5-year capital improvement plan that is considering some or all of the following:
• Addition of remote-controlled field reclosers possibly with arc detection technology; • Clearing poles with operating devices of flammable vegetation around them with a radius of 12’. Perform this for every wood pole with operating devices in the system for resiliency;
• Provide or clear additional access paths along power line easements and to ensure access and ability to perform maintenance.
• As 115KV transmission poles reach end of useful life for Tier 2 areas, replace with steel poles in kind.
• Engineering – Revise construction standards to implement arc suppression components, raptor framing, squirrel guards, tree wire, lightening arresters, and arc suppression fusing. • Create design standards for new equipment for remote controlled reclosers and implement into the SCADA system.
• Convert overhead lines to underground as feasible and economic; • Alternative Technologies- UEU will consider the feasibility of implementing alternative technologies, such as wire-break sensing and arc detection technology, as they become available and cost-effective.
• Replacement of overhead fuses with current limiting, non-arcing models in Tier 2 areas.
F. STRATEGY - PUBLIC SAFETY AND NOTIFICATION
The following is part of this WMP is to ensure a high level of communication with the community during high fire threat periods and disasters.
• Coordinate with UVFA and UPD through the City’s EOC during emergencies or large
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 17
scale outages;
• Utilize communications protocol with County EOC and/or Health and Human Services for notifications to vulnerable groups by utilizing available resources such as reverse 911, Nixle and other City and County wide notification systems; • Actively update social media using the COU Communications Team.
G. STRATEGY - RECLOSING AND DEENERGIZATION
Staff is evaluating and designing changes to our protection system so that during fire season circuits that are faulted do not attempt to reclose. UEU is currently in the process of designing and installing reclosers with radio communication to allow for remotely changing the reclose parameters. Currently three recloser locations are planned. We will continue to shut off power when directed to by Ukiah Valley Fire, Police, Cal Fire, or other emergency responding agencies. UEU will not preemptively shut off power during high fire threat periods for the following reasons:
• Our service territory is only 4.3 square miles and relatively compact and visible with proper technology;
• Turning off the power could put the community at higher risk to wildfire as it could impact water supplies and also create abnormal human activity that could increase opportunity for fire;
• We plan to have real-time information from staff located in areas identified as at risk of being subject to extreme weather conditions;
• We plan to use system hardening, situational awareness, vegetation management and the other strategies to avoid shutting off power.
H. STRATEGY - WILDFIRE RESPONSE & RECOVERY
• During a high fire threat event, stage fire protection equipment in a ready status and the COU EOC on standby;
• Staff critical assets for coverage and necessary shift changes during fire events; • Wildfire Response: Execute the City’s EOP
• The City of Ukiah Electric Utility is a member of the California Utility Emergency Association, which plays a key role in ensuring communications between utilities during emergencies including mutual aid. UEU also participate in the Western Energy Institute’s Western Region Mutual Assistance Agreement, which is a mutual assistance agreement covering utilities across a number of western states.
I. PROGRAM – UEU WILDFIRE PREVENTION PROGRAM
Appendix A
J. PROGRAM – UEU Capital Improvement Plan
K. PROGRAM – COU EMERGENCY OPERATIONS PLAN
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 18
6. COMMUNITY OUTREACH AND EDUCATION
COU, UVFA, UPD and UEU will maintain a proactive outreach and education strategy to create public awareness of fire threats, fire prevention, and available support during a wildfire or large power outages. Prior to an emergency, communication will include regular messages related to wildfire prevention, such as right-of-way management, tree trimming, line inspection, or other relevant topics. Methods of communication will include newsletters (Power Line Newsletter), website updates, social media posts, and public service announcements.
7. RESTORATION OF SERVICE
In the event of a wildfire or other emergency event, UEU will staff up to coordinate activities to restore service. UEU will restore power, following an event, in cooperation with UVFA, UPD, and COU Departments.
UEU management will oversee restoration and response activities. In the event that additional staff is needed, UEU may leverage mutual aid agencies, other City of Ukiah staff, and local aid organizations. The utility may also engage contractors on an as-needed basis.
The following describes the steps typically taken to begin the restoration process:
Assessment. UEU crews must patrol each line segment to determine the extent of damage that has occurred. The patrol involves assessing equipment access issues, any cleanup/debris removal issues and determining personal protective equipment requirements for the crews. UEU works with the local agency in charge of the fire to access impacted areas as soon as the area is deemed safe by fire officials.
Planning. After initial assessment, UEU supervisors, managers and engineers meet to plan the needed work. The team will work with system operations to prioritize the restoration efforts, targeting the circuits that serve the most critical infrastructure needs.
Mobilize. Based on the size and complexity of the rebuild/restoration efforts, UEU will coordinate the crews and material needs internally if possible. Mutual aid and contractors may be used on an “as needed” basis to provide additional support. Though UEU maintains a material vendor list and has contracts it can draw on for labor and material needs; though in instance of widespread catastrophic damage necessary materials and labor could experience shortages that may delay work.
Rebuild. The rebuild effort lead by UEU will commence as soon as areas become safe and accessible. The initial efforts will be to get the lines up and restore the damaged circuits.
Depending on the extent of damage, demolition may be performed concurrently or after crews start installing new facilities. UEU will incorporate new materials and technologies as indicated and available.
Restore. UEU, mutual aid, or contract crews will restore electric services to homes and businesses as soon as possible after the wildfire. Depending on the extent of damages, residential and business customers may have to perform repairs on their facilities and pass inspections by local agencies
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 19
prior to having full electric service restored.
In most cases, the following restoration priorities will be followed depending on the specific incident and available resources:
• Public safety in the affected areas;
• Worker safety in performing the restoration work;
• Life-support or critical customers;
• Critical infrastructure Hospitals, Key medical, City & County facilities and accounts; Sheriff’s Department and jail, City Police and Fire Departments, other key utility facilities (e.g., water, sewage, gas, citywide communications), Incident Command Site or Base Camp, Incident Evacuation Centers, local broadcast and radio Stations, etc.); • Major commercial activities/accounts critical to continuity of community services (e.g., gas stations, food stores, home supply stores, repair shops, eateries and lodging facilities, financial institutions, etc.;
• Reduce the total number of customers affected;
• Reduce the length of time customers have been without power.
In directing restoration efforts to best achieve the above priorities, UEU Operations Group personnel will generally find it most efficient to dedicate restoration resources to the following types of facilities in the following order of priority to optimally restore electric services:
• Transmission circuit (115 kV);
• Substation and Mendocino Power Plant Facilities;
• Distribution circuits (600 Amp -12 kV);
• Distribution feeders (200 Amp – 12 kV);
• Distribution transformers;
• Service lines.
8. EVALUATION OF THE PLAN
A. METRICS FOR MEASURING PLAN PERFORMANCE
UEU will track two metrics to measure the performance of this Wildfire Mitigation Plan: (1) number of fire ignitions; and (2) wires down within the service territory. Tracking the number of ignitions will assist in establishing if the strategies UEU is using for mitigation are working to decrease ignitions. Measuring the instances of wire down in the service territory will identify trends that could contribute to potential ignitions.
Metric 1: Fire Ignitions
For purposes of this metric, a fire ignition is defined as follows:
a) UEU facility was associated with the fire;
b) The fire was self-propagating and of a material other than electrical and/or communication facilities;
c) The resulting fire traveled greater than one linear meter from the ignition point; and
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 20
d) UEU has knowledge that the fire occurred.
In future Wildfire Mitigation Plans, UEU will provide the number of fires that occurred that were less than 1 acres in size. Any fires greater than 1 acres will be individually described.
UEU has no knowledge of any ignitions that meet the aforementioned criteria.
Metric 2: Wires Down
The second metric is the number of distribution and transmission wires downed within UEU’s service territory. For purposes of this metric, a wires down event includes any instance where an electric transmission or primary distribution conductor falls to the ground or onto a foreign object.
UEU will divide the wires down metric between wires down inside and outside of the High Fire Threat District. UEU will not normalize this metric by excluding unusual events, such as severe storms. Instead, UEU will supplement this metric with a qualitative description of any such unusual events.
B. IMPACT OF METRICS ON PLAN
In the initial years, UEU anticipates that there will be relatively limited data gathered through these metrics. However, as the data collection history becomes more robust, UEU will be able to identify areas of its operations and service territory that are disproportionately impacted. UEU will then evaluate potential improvements to the plan.
C. MONITORING AND AUDITING THE PLAN
Review of this WMP will occur annually and any lessons learned will have the highest priority for improving steps in the plan, any reference programs, and the process for implementation. UEU will present this plan to the Ukiah City Council on an annual basis. The comprehensiveness of this WMP will be assessed by and independent evaluator with experience in assessing the safe operation of electrical infrastructure. The independent evaluator shall issue a report that will be presented to the Ukiah City Council and be made available on the City’s Website.
D. IDENTIFYING AND CORRECTING DEFICIENCIES IN THE PLAN
UEU staff and qualified external stakeholders are encouraged to identify Wildfire Mitigation Plan deficiencies or potential deficiencies to the Electric Utility Director as soon as possible when observed. The Electric Utility Director shall evaluate each reported deficiency and, if the deficiency is determined to be a valid plan deficiency, it shall be entered into a log with the following information:
• Date the deficiency was discovered;
• Description of the deficiency;
• Source identifying the deficiency (e.g., Internal Audit); • Priority based on deficiency severity;
• Assigned corrective action including the date when it must be completed by; • Assigned staff responsible for completing the corrective action;
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 21
• Date corrective action completed.
The Electric Utility Director will go over the log at regularly scheduled Leadership and Supervisor Meetings.
E. MONITORING THE EFFECTIVENESS OF INSPECTIONS
UEU will perform inspections on either an annual, 5-year or 10-year cycle, based on GO 95 or fire mitigation recommendations. Any areas found that need improvement or appear hazardous will be documented with a work order, given a priority, and the work order will be tracked. When completed the work order will have a close date.
The Electric Utility Director will assign qualified internal staff or engage a third party to review and audit the equipment and line inspection programs called out in the Wildfire Mitigation Plan after the completion of the first six months of the plan. The assigned auditor will:
• Review records for the inspection programs;
• Interview staff performing inspections to assess their knowledge of the inspection programs;
• Monitor staff performing inspection activities;
• Review deficiencies noted in the programs;
• Identify systemic issues or problems;
• Note the timeliness of corrective actions;
• Pick a random sample of some completed corrective actions and verify the effectiveness of the corrective actions; and
• Issue a written report of findings.
The Superintendent of Utility Operations will review the audit findings and assign corrective action as applicable. A copy of the audit report will be routed to the Director.
9. INDEPENDENT AUDITOR
Public Utilities Code section 8387(c) requires UEU to contract with a qualified independent evaluator with experience in assessing the safe operation of electrical infrastructure to review and assess the comprehensiveness of this Wildfire Mitigation Plan.
UEU had the Plan reviewed using Power Engineers in June of 2020 following initial approval of the City Council in November 2019.
The report from the independent evaluator is available on UEU’s website. The results of the independent evaluator were presented to the Ukiah City Council at a public meeting on June 17, 2020.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 22
Appendix A
Ukiah Electric Utility Wildfire Prevention Program
1. Introduction
A. Purpose
The purpose of the Ukiah Electric Utility (UEU) Wildfire Prevention Program is to establish a framework for the electric utility to conduct an effective, coordinated program to prevent catastrophic impacts to its infrastructure from wildfire. This program is a significant component of the UEU Wildfire Mitigation Plan required by SB901. The Program aims to prevent the start of wildfires from utility operations in and around the City of Ukiah.
B. Goals & Objectives
a. Prevent electric utility caused wildfire by identifying hazards that pose a potential threat of ignition.
b. Prioritize prevention efforts by increasing inspections on overhead lines in tier 2 fire threat areas.
c. Improve and increase fuel reduction activities conducted during inspections. d. Develop enhanced inspection techniques using Infrared Technology. e. Develop a drone inspection program for overhead lines. f. Create community awareness for utility wildfire prevention.
2. Strategy/Scope of Work
A. Detailed Corrective Maintenance Program Inspections
UEU performs a service territory-wide inspection of its electric distribution system on inspection cycles outlined by General Order 95 (GO95) and General Order 128 (GO128).
In general, utilities must patrol their systems once a year in urban areas and conduct detailed inspections at a minimum of every three to five years. These inspections help mitigate wildfire risk by providing additional information about the electric distribution system and conditions that could result in ignition.
UEU will implement a detailed inspection of facilities in the Tier 2 areas of the City on an annual basis, in late spring, and expanding the inspections to include additional fuels reduction and vegetation management in mid-summer. The following resources will be used to accomplish this:
• UEU-CPUC Fire Threat Map
• Department Inspection Checklist
As part of its efforts to make its electric system more resistant to wildfires, UEU designed and actively maintains a vegetation management program aimed at keeping trees and brush clear of power lines. In areas where current GO95 rules are currently met, UEU is evaluating and assessing areas where vegetation management may need to exceed GO95 requirements, eliminating vegetation overhang near power lines and
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 23
increasing the clearance distances. In identified high risk areas that boarder or are close to Tier 2 wildfire threat areas, the radial clearance of branches or foliage from bare conductors will be increased to 12’.
UEU’s strategy for conducting its vegetation management program focuses on annual, routine inspections. In 2020, UEU began an electronic tree database to project growth and cycles of trimming needed to maintain clearances. The database includes information pertaining to the tree including species, height, diameter, growth rate and clearance. This history provides UEU information on trimming cycles and which trees require work annually.
UEU’s vegetation management operations are conducted in compliance with the City’s Tree Management Guidelines and the City’s Landmark Tree Program Guidelines and Policies. All debris associated with pruning operations are chipped and recycled.
B. UEU piloted a program utilizing infrared (IR) inspections for overhead distribution equipment in 2019 to identify potential issues on electrical equipment and connections that are not identifiable during visual inspections. These issues could potentially lead to wire down or result in ignition sources on the system. The program proved to be extremely successful identifying several instances that would have resulted in significant outage time and lead the Utility to extend the inspections to include underground facilities. Due to the success of the IR Pilot, UEU intends to create a formalized program for periodic IR inspections. The program will include the assembly of a thermography team that will be responsible for performing quality checks on equipment and facilities. These inspections will initially be performed annually in the high fire threat areas. Frequency of these inspections will be evaluated to determine if yearly inspections are warranted.
C. UEU has enhanced its existing inspection efforts by implementing and utilizing drones.
In spring of 2022, UEU began IR inspections using a drone, providing an up close look at the system infrastructure. This innovative technology is capable of capturing imagery from multiple angles, including above and allows qualified personnel to gain visual perspective that cannot be gained from ground inspections. The images and data obtained by these inspections will be evaluated by engineering staff to assess risk, determine trends and patterns of infractions. Drone technology has the potential to rapidly detect problems before they become a safety issue.
D. UEU will coordinate with the City Manager’s office to educate the public on the UEU’s wildfire prevention activities. Dissemination of information will be done through a variety of channels such as UEU’s quarterly newsletter, Facebook and the City’s website.
Esri, Garmin, GEBCO, NOAA NGDC, and other contributors
State of California - Public Utilities Commission
CPUC Fire-Threat Map
Adopted by CPUC January 19, 2018
µ0 15 30 60 90 120
Miles
For more information about the data and map depicted,
or other matters related to Utility wildfire safety,
please contact Terrie Prosper at [email protected] Basemap sourced from ESRI (World Oceans).
The data portrayed in the CPUC Fire-Threat Map were developed under Rulemaking 15-05-006, following procedures in Decision (D.) 17-01-009, revised by D.17-06-024, which adopted a work plan for the development of a utility High Fire-Threat District (HFTD) for application of enhanced fire safety regulations. The aforementioned decisions ordered that the HFTD be comprised of two individual map products. One of those map products is this CPUC Fire-Threat Map. The CPUC Fire-Threat Map depicts areas where enhanced fire safety regulations found in Decision 17-12-024 will apply. The final CPUC FireThreat Map was submitted to the Commission via a Tier 1 Advice Letter that was adopted by the Commission's Safety and Enforcement Division (SED) with a disposition letter on January 19, 2018. All data and information portrayed on the CPUC Fire-Threat Map are for the expressed use called out in D.17-12-024, and any other use of this map are not the responsibility or endorsed by the Commission or it's supporting Independent Review Team.
Fire-Threat Areas
Tier 2 - Elevated
Tier 3 - Extreme
Counties
Ukiah Electric Utility
2019
WILDFIRE
MITIGATION
PLAN
December 4, 2019
Revision 1 - June 17, 2020
Revision 2 – December 16, 2020
Revision 3 – June 15, 2022
Formatted: Left
Formatted: Indent: Left: 0.31", Right: 0.3"
Formatted: Font: Italic
Formatted: Font: Italic
ATTACHMENT 2
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 2
TABLE OF CONTENTS
1. OVERVIEW - WILDFIRE MITIGATION PLAN............................................................. 4 A. POLICY STATEMENT.......................................................................................... 4 B. PURPOSE ....................................................................................................................4 C. ORGANIZATION .................................................................................................. 5 D. DEFINITIONS AND ACRONYMNS …………………………………………... 5
2. OBJECTIVES OF THE WILDFIRE MITIGATION PLAN .............................................. 6 A. MINIMIZING SOURCES OF IGNITION ............................................................. 6 B. RESILIENCY OF THE ELECTRIC GRID............................................................ 6 C. WILDFIRE PREVENTION STRATEGIES & PROGRAMS................................ 6 D. IDENTIFYING UNNECESSARY OR INEFFECTIVE ACTIONS ...................... 8
3. ROLES AND RESPONSIBILITIES................................................................................... 9 A. GOVERNANCE STRUCTURE............................................................................. 9 B. ROLES AND RESPONSIBILITIES FOR PLAN EXECUTION........................... 9 C. COORDINATION WITH JOINT POLE INFRASTRUCTURE PROVIDERS..... 9 D. COORDINATION WITH CITY OF UKIAH DEPARTMENTS......................... 10 E. CAL OES STANDARDIZED EMERGENCY MANAGEMENT SYSTEM ...... 11
4. WILDFIRE RISK AND RISK DRIVERS........................................................................ 12 A. BACKGROUND................................................................................................... 12 B. ENTERPRISE SAFETY AND WILDFIRE RISK METHODOLOGY ............... 12 C. SYSTEM AND OPERATIONAL RISK .............................................................. 12 D. GEOGRAPHICAL & CLIMATE RISK............................................................... 13 E. CPUC HIGH FIRE THREAT DISTRICTS.......................................................... 13
5. WILDFIRE PREVENTION STRATEGY AND PROGRAMS ....................................... 13 A. STRATEGY – VEGETATION MANAGEMENT............................................... 13 B. STRATEGY - ENHANCED INSPECTIONS ...................................................... 15 C. STRATEGY - SITUATIONAL AWARENESS................................................... 15 D. STRATEGY - OPERATIONAL PRACTICES .................................................... 15 E. STRATEGY - SYSTEM HARDENING .............................................................. 16 F. STRATEGY - PUBLIC SAFETY AND NOTIFICATION.................................. 16 G. STRATEGY - RECLOSING AND DEENERGIZATION................................... 17 H. STRATEGY - WILDFIRE RESPONSE & RECOVERY .................................... 17 I. PROGRAM – UEU WILDFIRE PREVENTION PROGRAM……………….... 17 J. PROGRAM – UEU 5-YEAR CAPITAL IMPROVEMENT PLAN.................... 17
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 3
K. PROGRAM – COU EMERGENCY OPERATIONS PLAN................................ 17
6. COMMUNITY OUTREACH AND EDUCATION......................................................... 18
7. RESTORATION OF SERVICE ....................................................................................... 18
8. EVALUATION OF THE PLAN...........................................................................................19 A. METRICS FOR MEASURING PLAN PERFORMANCE .................................. 19 B. IMPACT OF METRICS ON PLAN ..................................................................... 20 C. MONITORING AND AUDITING THE PLAN................................................... 20 D. IDENTIFYING AND CORRECTING DEFICIENCIES IN THE PLAN ............ 21 E. MONITORING THE EFFECTIVENESS OF INSPECTIONS............................ 21
9. INDEPENDENT AUDITOR............................................................................................ 21
10. EXHIBITS
A. CPUC FIRE THREAT MAP
11.10. APPENDICIES…………………………………………………………………………..22
A. WILDFIRE PREVENTION PROGRAM……………………………………….22
11. EXHIBITS
A. CPUC FIRE THREAT MAP
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 4
1. OVERVIEW
A. POLICY STATEMENT
Ukiah Electric Utility has been operating its electric system for over one-hundred years. Public and employee safety is paramount in the operation, construction and maintenance of the electric system. Given recent, catastrophic wildfires in California, the state passed Senate Bill (SB) 901 in September 2018. The law requires utilities to prepare wildfire mitigation measures if the utility’s overhead electrical lines and equipment are located in an area that has a significant risk of wildfire resulting from those electrical lines and equipment. The law requires the wildfire mitigation measures to incorporate specific information and procedures and requires the local publicly owned electric utility, before January 1, 2020, and annually thereafter, to prepare a wildfire mitigation plan. Portions of Ukiah Electric Utility’s (UEU) electrical infrastructure is located in and adjacent to California Public Utilities Commission (CPUC) designated Tier 2 wildfire threat areas.
UEU’s overarching goal is to provide safe, reliable, and economic electric service to its local community. In order to meet this goal, UEU constructs, maintains, and operates its electrical lines and equipment in a manner that minimizes the risk of catastrophic wildfire posed by its electrical lines and equipment.
B. PURPOSE OF THE WILDFIRE MITIGATION PLAN
This Wildfire Mitigation Plan (WMP) describes the range of activities that UEU is taking or considering, to mitigate the threat of power-line ignited wildfires, including its various programs, policies, and procedures. This plan complies with the requirements of Public Utilities Code section 8387 for publicly owned electric utilities to prepare a wildfire mitigation plan by January 1, 2020, and annually thereafter. The Plan will be iterative, promote continuous improvement year-overyear, and represent best efforts to implement industry best practices in a prudent and reasonable manner.
UEU is a department within the City of Ukiah. For wildfire prevention and response, UEU is subordinate to the Ukiah Valley Fire Authority (UVFA) and the City of Ukiah Police Department (UPD).
The City of Ukiah adopted an Emergency Operations Plan (EOP) in 20212007 and the Building Community Preparedness and Resilience Program in 2019. The UEU Wildfire Mitigation Plan supports the aspirational goals of these plans in the area of Wildland Fire. The objectives of the Plans specifically supported by this UEU Wildfire Mitigation Plan are as follows:
1. Educate the public about wildland fire dangers and the steps that can be taken to prevent or minimize their effects.
2. Maintain Emergency Operations Center for coordination of information and resources.
3. Reduce the potential for destructive actions of the fire should ignition occur, utilizing fire preplans, ensuring a properly trained, staffed, and equipped emergency response capability, and timely response to prevent the spread of the fire, minimizing risks to humans and property.
Formatted: Not Highlight
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 5
4. Ensure that adequate resources are available to plan for incidents that may occur in the high fire hazard severity zones within the City of Ukiah.
C. ORGANIZATION OF THE WILDFIRE MITIGATION PLAN
This Wildfire Mitigation Plan includes the following elements:
Section 2 - Objectives of the Plan;
Section 3 - Roles and responsibilities for carrying out the Plan; Section 4 - Identification of key wildfire risks and risk drivers; Section 5 - Description of wildfire prevention, mitigation, and response strategies and programs; Section 6 - Community outreach and education;
Section 7 - Restoration of service following a wildfire; Section 8 - Metrics for evaluating the Performance of the WMP and identifying areas for improvement;
Section 9 - Independent audit of the Plan.
D. DEFINITIONS AND ACRONYMNS
a. COU or City – City of Ukiah
b. CPUC - California Public Utilities Commission is a regulatory agency that regulates privately owned public utilities in California.
c. ICS – Incident Command System is a standardized approach to the command, control and coordination of emergency response.
d. IR – Infrared technology that uses thermography to recognize hot spots in electrical equipment.
e. EOP – Emergency Operations Plan is a City Plan, formerly known as the Multi Hazard Emergency Response Plan that establishes communication, facilitates collaboration and ensures compliance with local, state and federal emergency management agencies. f. LIDAR – Light detection and ranging is a remote sensing technology that uses light in the form of a pulsed laser to measure distances.
g. MTA – Mendocino Transit Authority
h. OES – Mendocino County Sheriff’s Office of Emergency Services i. SCADA – Supervisory Control and Data Acquisition is a computer system for gathering and analyzing real time data.
j. UEU – Ukiah Electric Utility.
k. UPD – Ukiah Police Department.
l. UVFA – Ukiah Valley Fire Authority.
m. WMP – Wildfire Mitigation Plan refers to this plan as ordered by Senate Bill 901.
2. OBJECTIVES OF THE WILDFIRE MITIGATION PLAN
A. MINIMIZING SOURCES OF IGNITION
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 6
The primary goal of this WMP is to minimize the probability that UEU’s transmission and distribution system may be the origin or contributing source for the ignition of a fire as well as to protect the system from wildfire damage.
UEU is in the process of evaluating prudent and cost-effective improvements to its physical assets, operations, and training to help meet this objective. UEU will implement theose changes consistent with this WMP as staffing and budget allows.
B. RESILIENCY OF THE ELECTRIC GRID
The secondary goal of this WMP is to improve the resiliency of the electric grid. As part of the development and on-going implementation of this plan, UEU will assess new industry practices and technologies that will reduce the likelihood of an interruption (frequency) in service and improve the restoration of service.
Other resiliency efforts include mitigating fire fuels inthat areas that are a threat to our facilities and equipment along with reducing the chance that lives or property will be lost to wildfire.
Additionally, improved fire coordination will improve resiliency and help avoid the need for public safety power shut off protocols during high fire threat weather. Fire fuels reduction and improved fire response will be addressed in the UEU Wildfire Prevention Program. that is in development and described in Section 5.
C. WILDFIRE PREVENTION STRATEGIES & PROGRAMS
1. Strategies
The following strategies are part of this Plan and described in more detail in Section 5. • VEGETATION MANAGEMENT
These strategies help to control vegetation near to UEU overhead transmission and distribution lines so they better adhere to clearance specifications. They also include fire fuels mitigation and other work in order to prevent our system from causing a fire and to protect our system from fire.
• ENHANCED INSPECTIONS
These strategies consist of assessment and diagnostic activities as well as associated corrective actions. The practices in this category aim to ensure all infrastructure is in working condition and vegetation adheres to defined minimum distance specifications. • SITUATIONAL AWARENESS
These strategies consist of methods to improve system visualization and awareness of environmental conditions. The practices in this category aim to provide tools to improve the other components of the plan.
• OPERATIONAL PRACTICES
These strategies consist of proactive, day-to-day actions taken to mitigate wildfire risks.
The practices in this category aim to ensure UEU is prepared in high-risk situations, such
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 7
as dry, windy environmental conditions.
• SYSTEM HARDENING
These strategies consist of system, equipment, and structure design and technical upgrades.
The practices in this category aim to improve system hardening to prevent contact between infrastructure and fuel sources, such as vegetation and animals. It also includes making the system more resilient to wildfire and other disasters.
• PUBLIC SAFETY AND NOTIFICATION
These strategies will focus on ways to engage the community as partners in preventing and identifying wildfire risk. They include improving outage notification and other items in the interest of public safety.
• RECLOSING AND DEENERGIZATION
These strategies include discussion of de-energization as well as circuit reclosing. • WILDFIRE RESPONSE & RECOVERY
These strategies consist of procedures to react to wildfire or other related emergency conditions. The practices aim to formalize protocols for these situations, so UEU can provide an adequate response and recovery.
2. Programs
The strategies above will, as budgetary constraints and staffing permit, be developed and implemented through the following programs that are either active or are being created and coordinated as part of this WMP and are described in more detail in Section 5. • UEU Wildfire Prevention Program - Appendix A
• UEU Distribution Capital Improvement Program
• COU Emergency Response Plan (EOP)
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 8
UEU Wildfire Prevention Strategies and Program Matrix
Wildfire
Prevention Plan
(in development)
5-year Capital
Improvement Plan COU EOP
Vegetation
Management
x
Enhanced
Inspections
x x
Situational
Awareness
x x
Operational
Practices
x x
System
Hardening
x x
Public Safety &
Notification
x x
Reclosing &
De-energization
x x x
Wildfire
Response &
Recovery
x x
D. IDENTIFYING UNNECESSARY OR INEFFECTIVE ACTIONS
The final goal for this WMP is to measure the effectiveness of specific wildfire mitigation strategies.
UEU will assess the merits of modifications. This plan will also help determine if more costeffective measures would produce the same or improved results.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 9
3. ROLES AND RESPONSIBILITIES
A. UEU GOVERNANCE STRUCTURE
This WMP is subject to the direct supervision by the Ukiah City Council (Council), and will be implemented by the UEU Director (“Director”). The City of Ukiah, a general law city, has a City Council - manager form of governance. The City Council is the Utility Commission for UEU.
B. ROLES AND RESPONSIBILITIES FOR PLAN EXECUTION
Executive Level Responsibility: The Director will oversee implementation and ensure that staff follow procedures and protocols. The Assistant Director will manage the execution of performance monitoring. This includes providing guidance to staff and leading the development of reports. The staff responsible for each metric area will aggregate relevant metrics at the direction of the Assistant Director.
1. Program Owners: The table below outlines the current assignments and are subject to change.
Program Owner
UEU Wildfire Prevention
Program
COU Fire Marshal’s Office and UEU
Director
UEU Distribution Capital
Improvement Program
UEU Assistant Director
UEU COU EOP UEU Assistant DirectorCOU Office of
Emergency Management Coordinator
Ukiah City Council
City Attorney City Manager
UEU
Director
Utility
Operations
Technical
Services Resources
Formatted Table
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 10
2. Strategy Leads: The table below outlines the proposed assignments and are subject to change.
Strategy Lead Personnel Key Technical Personnel
Vegetation Management Electric Superintendent Senior Electrical Engineer Enhanced Inspections Electric Superintendent
Electrical Technicians
Senior Electrical Engineer
Electric Superintendent
Foreman
Electrical Technicians
Situational Awareness EU Director Senior Electrical Engineer Electric Superintendent
Operational Practices
Senior Electrical
Engineer
Assist. Electric Utility
Director
Senior Electrical Engineer
Electric Superintendent
System Hardening
Assist. Electric Utility
DirectorSenior Electrical
Engineer
Senior Electrical Engineer
Electric Superintendent
Public Safety & Notification EU Director EU Program Coordinator Management Analyst
Reclosing & De-energization
Assist. Electric Utility
DirectorSenior Electrical
Engineer
Senior Electrical Engineer
Electric Superintendent
Foreman
Wildfire Response &
Recovery Electric Superintendent
COU Fire Chief
Senior Electrical Engineer
Line Foremen
C. COORDINATION WITH JOINT POLE INFRASTRUCTURE
PROVIDERS
For joint pole fire prevention, UEU takes the lead role and informs the subordinate providers when UEU identifies any compromised poles due to third-party attachments. UEU coordinates with communication and electric infrastructure providers throughout the year when work on the system effects their equipment and identifies safety issues. If UEU staff discovers a facility in need of repair owned by an entity, UEU may issue a notice to repair to the facility owner and work to ensure that necessary repairs are promptly completed. During emergencies, UEU assumes the primary role and informs providers when there is damage or risk to their equipment.
D. COORDINATION WITH CITY OF UKIAH DEPARTMENTS
Ukiah Valley Fire Authority
The Ukiah Valley Fire Authority is the lead agency in cooperation with UEU for implementation of the UEU Wildfire Prevention & Improved communication Program. UVFA is the City’s lead for emergency operations and directs UEU regarding public safety priorities.
Formatted Table
Formatted: Condensed by 0.05 pt
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 11
Ukiah Police Department
UEU coordinates with UPD and is subordinate for emergency and public safety issues. UEU will work closely with the UPD for situational awareness and other public safety issues related to this WMP.
Ukiah Public Works Department
UEU is investigating opportunities to harden the electrical system and increase survivability for traffic control, water and wastewater infrastructures. During wildfires and other public safety events, UEU closely will work with Public Works to ensure water/wastewater facilities and other critical infrastructure have power. These facilities are not only critical for defending the City from wildfire, but are essential for safe repopulation following any disaster. Additionally, the Mendocino Transit Authority (MTA) is a critical operation for evacuations during emergencies and will be part of planning and operational reviews process.
Ukiah Community Services Department
UEU is partnered with the COU Community Services Department as part of the UEU Wildfire Prevention Program for fire fuels mitigation as well as other programs and projects.
Other COU Departments and Administration
UEU, as a member of the City of Ukiah Team, will work to ensure information regarding warnings, alerts, and widespread outages are shared with other departments. The City’s Communications Team will be an integral part of getting information out to the media and public and will be coordinated with either and/or both the City’s EOC Emergency Management Coordinator as well as any Incident Command in place.
E. CAL OES STANDARDIZED EMERGENCY MANAGEMENT SYSTEM
As a utility department of the COU located in Mendocino County, UEU may participate in various emergency operation centers depending on the situation and lead agency. As a local governmental agency, COU has planning, communication, and coordination obligations pursuant to the California Office of Emergency Services’ Standardized Emergency Management System (“SEMS”) Regulations, adopted in accordance with Government Code section 8607. The SEMS Regulations specify roles, responsibilities, and structures of communications at five different levels: field response, local government, operational area, regional, and state. The COU maintains a EOP that includes UEU. The COU works closely with Mendocino County to coordinate emergency operations, including the Mendocino County Sherriff’s Office of Emergency Services (OES).
The Mendocino County Sheriff's Office of Emergency Services (OES) coordinates with Federal, State, and local agencies to prepare, respond, and recover from emergencies and natural disasters. • OES is responsible for maintaining and updating the County Multi Hazard Mitigation Plan, which is an all hazards plan for Mendocino County.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 12
• OES also coordinates and maintains the county Emergency Operation Center (EOC). The EOC can be used during a major incident to carry out the principles of emergency preparedness and emergency management between multiple agencies. • The Office of Emergency Services provides technical advice to the Sheriff on local emergency declarations and his direct link to the California Governor's Office of Emergency Services during disasters or any other critical incident. In the event of a major incident OES can work with CAL OES to obtain a Presidential proclamation. • OES works closely with other local agencies assisting them in preparing emergency plans and in disaster training. OES works as a point of contact for local agencies to the California Governor's Office of Emergency Services.
Pursuant to this structure, UEU coordinates and communicates with the relevant local, state and Federal agencies. This includes participating in City & County EOC exercises as well as providing annual safety meetings. Pursuant to the Emergency Operations Program, an UEU EOC Liaison will participate in the City or County EOC using the standardized Incident Command System (ICS).
4. WILDFIRE RISK AND RISK DRIVERS
A. BACKGROUND
Ukiah typically experiences cool, wet winters and hot, dry summers creating extreme fire weather conditions especially from May through October. Daily temperatures during fire seasons (JuneOctober) can be above 90° Fahrenheit with a relative humidity of less than 30%. Typical vegetation within UEU’s service territory include various types of trees including redwood, oak, pine and fir trees as well as annual grasses. Areas of dense brush and annual grasses are present, and result in high fire danger and significant fires especially during wind events. These conditions combine to create extreme fire danger. The risk of catastrophic wildfire in the area rises increases as the recent trend of drought conditions increases continue.
B. ENTERPRISE SAFETY AND WILDFIRE RISK METHODOLOGY
In order to ascertain the level of risk to our system, staff looked at our historic outages caused by animals, birds, vegetation, car-pole accidents, and overhead equipment failures as a way to assess wildfire risk. These events were selected because such events can create circumstances such as wire down or sparking that can result in an ignition source. Additionally, UEU will review historic fire records to see if there are other areas of risk that should be addressed.
C. SYSTEM AND OPERATIONAL RISK
UEU’s designs and constructs its electric facilities to meet or exceed the relevant federal, state, or industry standards. UEU uses the CPUC General Order (GO) 95 as a key industry standard for design and construction standards for overhead electrical facilities and, as such, meets or exceeds all applicable standards in GO 95. Additionally, UEU monitors and follows, as appropriate, the National Electric Safety Code.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 13
Risk drivers associated with design, construction, operations, and maintenance, within our 4.3 square mile service territory include CPUC Tier 2 high fire threat areas that account for approximately 10% of UEU’s facilities.
D. GEOGRAPHICAL & CLIMATE RISK
Within UEU’s service territory and the surrounding areas, the primary risk drivers associated with geography and climate for wildfire are the following:
a) Extended drought;
b) Vegetation type;
c) Vegetation density (especially the West side)
d) Weather;
e) High winds;
f) Terrain;
g) Low humidity;
h) Changing weather patterns
i) Community at risk
j) Fire history
E. CPUC HIGH FIRE THREAT DISTRICTS
UEU will incorporate the California Public Utility Commission’s (CPUC) Fire Threat Map (Exhibit A) into its construction, inspection, maintenance, repair, and clearance practices, where applicable.
UEU reviews the CPUC Fire Threat Map annually to identify needed adjustments to hazard threat levels due to changes in urban development and/or vegetation conditions. When adjustments are identified, UEU collaborates with Ukiah Valley Fire Authority and City Departments and CAL FIRE to update the CPUC Fire Threat Map data and UEU’s Fire Threat Map accordingly. The UEU’s Fire Threat Map depicts the highest fire threat known.
5. WILDFIRE PREVENTION STRATEGY AND PROGRAMS
A. STRATEGY – VEGETATION MANAGEMENT
UEU meets or exceeds the minimum industry standard vegetation management practices. For both transmission and distribution level facilities, UEU meets: (1) GO 95 Rule 35; and (2) the GO 95 Appendix E Guidelines to Rule 35 (See table below). These standards require significantly increased clearances in the High Fire Threat areas. In identified high risk areas that border or are close to Tier 2 wildfire threat areas, the radial clearance of branches or foliage from bare conductors will be increased to 12’. The recommended time-of-trim guidelines do not establish a mandatory standard, but instead provide useful guidance to utilities. UEU has developed a tree inventory to catalog existing trees and will use specific knowledge of growing conditions and tree species to determine the appropriate time of trim clearance in each circumstance. UEU performs this work with arborists and a contract for tree trimming services as needed. Additionally, vegetation clearing is completed at the base of poles to minimize potential sources of spread.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 14
GO 95
Guidelines to Rule 35
The radial clearances shown below are recommended minimum clearances that should be established, at time of trimming, between the vegetation and the energized conductors and associated live parts where practicable. Reasonable vegetation management practices may make it advantageous for the purposes of public safety or service reliability to obtain greater clearances than those listed below to ensure compliance until the next scheduled maintenance. Each utility may determine and apply additional appropriate clearances beyond clearances listed below, which take into consideration various factors, including: line operating voltage, length of span, line sag, planned maintenance cycles, location of vegetation within the span, species type, experience with particular species, vegetation growth rate and characteristics, vegetation management standards and best practices, local climate, elevation, fire risk, and vegetation trimming requirements that are applicable to State Responsibility Area lands pursuant to Public Resource Code Sections 4102 and 4293.
Voltage of Lines
Radial Clearance of Bare
Line Conductors From
Tree Branches or Foliage
Radial clearances for any conductor of a line operating at 2,400 or more volts, but less than 72,000 volts 4 feet Radial clearances for any conductor of a line operating at 72,000 or more volts, but less than 110,000 volts 6 feet Radial clearances for any conductor of a line operating at 110,000 or more volts, but less than 300,000 volts 10 feet Radial clearances for any conductor of a line
operating at 300,000 or more volts 15 feet
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 15
In addition, UEU Wildfire Prevention Program (in development)(Appendix A) will include the following enhancements
• No vertical coverage allowed above UEU transmission lines; • Provide vegetation control in a 30-foot perimeter around the Power Plant and substations conductors.
• For public land, provide easement clear from ground to sky adjacent to UEU facilities; • Work with adjacent customers to get approval for wider clearance on their land. This could include tall, diseased, leaning trees that appear to be at risk of falling into our lines. • Perform additional vegetation removal for fuels reduction in the easement on an annual rotation to ensure CPUC recommended clearances are maintained based on the fire hazard zone where each transmission and distribution line is located; • Consider undergrounding areas where heritage trees are prevalent.
B. STRATEGY - ENHANCED INSPECTIONS
Inspection plays an important role in wildfire prevention. UEU currently follows the inspection cycles outlined in California General Order 95 and General Order 128. UEU’s current inspection activities incorporate several components including annual infrared (IR) patrol of overhead lines and substations, inspection of wood poles, 115 KV lines and GIS data collection and sharing.
Some of the enhancements UEU will be exploring includehas implemented the use of unmanned aerial vehicles with IR and possibly LIDAR (light detection and ranging) capability. The frequency of inspections will be increased in the high fire threat areas and when storms or other disasters have significantly impacted our system.
C. STRATEGY - SITUATIONAL AWARENESS
Presently UEU is evaluating to upgrade an automated control management system that can be used during outages. UEU is also investigating advanced metering infrastructure (AMI) technology that has the ability to track customer outages as part of an Outage management System.
Other efforts will include the following technology in collaboration with Ukiah PD and Ukiah Valley Fire Authority.:
• Use unmanned aerial vehicles during high fire threat days for early detection, infrared inspection of hard to reach areas, and other uses in the interest of public safety; • Communication system upgrades for wildfire and disaster response and recovery; D. STRATEGY - OPERATIONAL PRACTICES
UEU will operate the system in a manner that will minimize potential wildfire risks including taking all reasonable and practicable actions to minimize the risk of a catastrophic wildfire caused by UEU electric facilities. UEU will take corrective action for deficiencies when the staff witnesses or is notified of improperly install or maintained fire protection measures. In addition
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 16
to those general principles, several new operational practices will help reduce the risk of wildfire and improve the response time in the event of a fire including:
• During high wildfire, threat periods (red flag warnings) perform only essential work and light work that can be completed while performing observations in areas of concern.
Staff may be placed at Orchard substation and Mendocino Hydroelectric power plant with an electrical technician or lineman, posting linemen in various parts of the city where the fire danger is higher, and having other field personnel patrolling the city. All personnel will directly report to Fire/Police any hazardous observations. All available UEU Staff placed on standby.
• Collect and maintain wildfire and system data necessary for the implementation and evaluation of this Wildfire Mitigation Plan.
E. STRATEGY - SYSTEM HARDENING
UEU’s electric facilities are designed, constructed, and maintained to meet or exceed the relevant federal, state, or industry standard. UEU treats CPUC General Order (GO) 95 as a key industry standard for design and construction standards for overhead electrical facilities. UEU meets or exceeds all standards in GO 95. Additionally, UEU monitors and follows, as appropriate, the National Electric Safety Code. In addition to standards, UEU develops a 5-year capital improvement plan that is considering some or all of the following:
• Addition of remote-controlled field reclosers possibly with arc detection technology; • Clearing pPoles with operating devices are cleared of flammable vegetation around them with a radius of 120’. Perform this for every wood pole with operating devices in the system for resiliency;
• Provide or clear additional access paths along power line easements and to ensure access and ability to perform maintenance.
• As 115KV transmission poles reach end of useful life for Tier 2 areas, replace with steel poles in kind.
• Engineering – Revise construction standards to implement arc suppression components, raptor framing, squirrel guards, tree wire, lightening arresters, and arc suppression fusing. • Create design standards for new equipment for remote controlled reclosers and implement into the SCADA system.
• Convert overhead lines to underground as feasible and economic; • Alternative Technologies- UEU will consider the feasibility of implementing alternative technologies, such as wire-break sensing and arc detection technology, as they become available and cost-effective.
• Replacement of overhead fuses with current limiting, non-arcing models in Tier 2 areas.
F. STRATEGY - PUBLIC SAFETY AND NOTIFICATION
The following is part of this WMP is to ensure a high level of communication with the community during high fire threat periods and disasters.
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 17
• Coordinate with UVFA and UPD through the City’s EOC during emergencies or large scale outages;
• Utilize communications protocol with County EOC and/or Health and Human Services for notifications to vulnerable groups by utilizing available resources such as reverse 911, Nixle and other City and County wide notification systems; • Actively update social media using the COU Communications Team.; G. STRATEGY - RECLOSING AND DEENERGIZATION
Staff is evaluating and designing changes to our protection system so that during fire season circuits that are faulted do not attempt to reclose. UEU is currently in the process of designing and installing reclosers with radio communication to allow for remotely changing the reclose parameters. Currently three recloser locations are planned. We will continue to shut off power when directed to by Ukiah Valley Fire, Police, Cal Fire, or other emergency responding agencies. We UEU will not preemptively shut off power during high fire threat periods for the following reasons:
• Our service territory is only 4.3 square miles and relatively compact and visible with proper technology;
• Turning off the power could put the community at higher risk to wildfire as it could impact water supplies and also create abnormal human activity that could increase opportunity for fire;
• We plan to have real-time information from staff located in areas identified as at risk of being subject to extreme weather conditions;
• We plan to use system hardening, situational awareness, vegetation management and the other strategies to avoid shutting off power.
H. STRATEGY - WILDFIRE RESPONSE & RECOVERY
• During a high fire threat event, stage fire protection equipment in a ready status and the COU EOCP on standby;
• Staff critical assets for coverage and necessary shift changes during fire events; • Wildfire Response: Execute the City’s EOP
• The City of Ukiah Electric Utility is a member of the California Utility Emergency Association, which plays a key role in ensuring communications between utilities during emergencies including mutual aid. UEU also participate in the Western Energy Institute’s Western Region Mutual Assistance Agreement, which is a mutual assistance agreement covering utilities across a number of western states.
I. PROGRAM – UEU WILDFIRE PREVENTION PROGRAM
Appendix A
J. PROGRAM – UEU Capital Improvement Plan
K. PROGRAM – COU EMERGENCY OPERATIONS PLAN
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 18
6. COMMUNITY OUTREACH AND EDUCATION
COU, UVFA, UPD and UEU will maintain a proactive outreach and education strategy to create public awareness of fire threats, fire prevention, and available support during a wildfire or large power outages. Prior to an emergency, communication will include regular messages related to wildfire prevention, such as right-of-way management, tree trimming, line inspection, or other relevant topics. Methods of communication will include newsletters (Power Line Newsletter), website updates, social media posts, and public service announcements.
7. RESTORATION OF SERVICE
In the event of a wildfire or other emergency event, UEU will staff up to coordinate activities to restore service. UEU will restore power, following an event, in cooperation with UVFA, UPD, and COU Departments.
UEU management will oversee restoration and response activities. In the event that additional staff is needed, UEU may leverage mutual aid agencies, other City of Ukiah staff, and local aid organizations. The utility may also engage contractors on an as-needed basis.
The following describes the steps typically taken to begin the restoration process:
Assessment. UEU crews must patrol each line segment to determine the extent of damage that has occurred. The patrol involves assessing equipment access issues, any cleanup/debris removal issues and determining personal protective equipment requirements for the crews. UEU works with the local agency in charge of the fire to access impacted areas as soon as the area is deemed safe by fire officials.
Planning. After initial assessment, UEU supervisors, managers and engineers meet to plan the needed work. The team will work with system operations to prioritize the restoration efforts, targeting the circuits that serve the most critical infrastructure needs.
Mobilize. Based on the size and complexity of the rebuild/restoration efforts, UEU will coordinate the crews and material needs internally if possible. Mutual aid and contractors may be used on an “as needed” basis to provide additional support. Though UEU maintains a material vendor list and has contracts it can draw on for labor and material needs; though in instance of widespread catastrophic damage necessary materials and labor could experience shortages that may delay work.
Rebuild. The rebuild effort lead by UEU will commence as soon as areas become safe and accessible. The initial efforts will be to get the lines up and restore the damaged circuits.
Depending on the extent of damage, demolition may be performed concurrently or after crews start installing new facilities. UEU will incorporate new materials and technologies as indicated and available.
Restore. UEU, mutual aid, or contract crews will restore electric services to homes and businesses as soon as possible after the wildfire. Depending on the extent of damages, residential and business customers may have to perform repairs on their facilities and pass inspections by local agencies
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 19
prior to having full electric service restored.
In most cases, the following restoration priorities will be followed depending on the specific incident and available resources:
• Public safety in the affected areas;
• Worker safety in performing the restoration work;
• Life-support or critical customers;
• Critical infrastructure Hospitals, Key medical, City & County facilities and accounts; Sheriff’s Department and jail, City Police and Fire Departments, other key utility facilities (e.g., water, sewage, gas, citywide communications), Incident Command Site or Base Camp, Incident Evacuation Centers, local broadcast and radio Stations, etc.); • Major commercial activities/accounts critical to continuity of community services (e.g., gas stations, food stores, home supply stores, repair shops, eateries and lodging facilities, financial institutions, etc.;
• Reduce the total number of customers affected;
• Reduce the length of time customers have been without power.
In directing restoration efforts to best achieve the above priorities, UEU Operations Group personnel will generally find it most efficient to dedicate restoration resources to the following types of facilities in the following order of priority to optimally restore electric services:
• Transmission circuit (115 kV);
• Substation and Mendocino Power Plant Facilities;
• Distribution circuits (600 Amp -12 kV);
• Distribution feeders (200 Amp – 12 kV);
• Distribution transformers;
• Service lines.
8. EVALUATION OF THE PLAN
A. METRICS FOR MEASURING PLAN PERFORMANCE
UEU will track two metrics to measure the performance of this Wildfire Mitigation Plan: (1) number of fire ignitions; and (2) wires down within the service territory. Tracking the number of ignitions will assist in establishing if the strategies UEU is using for mitigation are working to decrease ignitions. Measuring the instances of wire down in the service territory will identify trends that could contribute to potential ignitions.
Metric 1: Fire Ignitions
For purposes of this metric, a fire ignition is defined as follows:
a) UEU facility was associated with the fire;
b) The fire was self-propagating and of a material other than electrical and/or communication facilities;
c) The resulting fire traveled greater than one linear meter from the ignition point; and
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 20
d) UEU has knowledge that the fire occurred.
In future Wildfire Mitigation Plans, UEU will provide the number of fires that occurred that were less than 1 acres in size. Any fires greater than 1 acres will be individually described.
UEU has no knowledge of any ignitions that meet the aforementioned criteria.
Metric 2: Wires Down
The second metric is the number of distribution and transmission wires downed within UEU’s service territory. For purposes of this metric, a wires down event includes any instance where an electric transmission or primary distribution conductor falls to the ground or onto a foreign object.
UEU will divide the wires down metric between wires down inside and outside of the High Fire Threat District. UEU will not normalize this metric by excluding unusual events, such as severe storms. Instead, UEU will supplement this metric with a qualitative description of any such unusual events.
B. IMPACT OF METRICS ON PLAN
In the initial years, UEU anticipates that there will be relatively limited data gathered through these metrics. However, as the data collection history becomes more robust, UEU will be able to identify areas of its operations and service territory that are disproportionately impacted. UEU will then evaluate potential improvements to the plan.
C. MONITORING AND AUDITING THE PLAN
Review of this WMP will occur annually and any lessons learned will have the highest priority for improving steps in the plan, any reference programs, and the process for implementation. UEU will present this plan to the Ukiah City Council on an annual basis. The comprehensiveness of this WMP will be assessed by and independent evaluator with experience in assessing the safe operation of electrical infrastructure. The independent evaluator shall issue a report that will be presented to the Ukiah City Council and be made available on the City’s Website.
D. IDENTIFYING AND CORRECTING DEFICIENCIES IN THE PLAN
UEU staff and qualified external stakeholders are encouraged to identify Wildfire Mitigation Plan deficiencies or potential deficiencies to the Assistant Electric Utility Director as soon as possible when observed. The Assistant Electric Utility Director shall evaluate each reported deficiency and, if the deficiency is determined to be a valid plan deficiency, it shall be entered into a log with the following information:
• Date the deficiency was discovered;
• Description of the deficiency;
• Source identifying the deficiency (e.g., Internal Audit); • Priority based on deficiency severity;
• Assigned corrective action including the date when it must be completed by; • Assigned staff responsible for completing the corrective action;
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 21
• Date corrective action completed.
The Assistant Electric Utility Director will go over the log at regularly scheduled Leadership and Supervisor Meetings.
E. MONITORING THE EFFECTIVENESS OF INSPECTIONS
UEU will perform inspections on either an annual, 5-year or 10 year10-year cycle, based on GO 95 or fire mitigation recommendations. Any areas found that need improvement or appear hazardous will be documented with a work order, given a priority, and the work order will be tracked. When completed the work order will have a close date.
The Assistant Electric Utility Director will assign qualified internal staff or engage a third party to review and audit the equipment and line inspection programs called out in the Wildfire Mitigation Plan after the completion of the first six months of the plan. The assigned auditor will:
• Review records for the inspection programs;
• Interview staff performing inspections to assess their knowledge of the inspection programs;
• Monitor staff performing inspection activities;
• Review deficiencies noted in the programs;
• Identify systemic issues or problems;
• Note the timeliness of corrective actions;
• Pick a random sample of some completed corrective actions and verify the effectiveness of the corrective actions; and
• Issue a written report of findings.
The Assistant Director Superintendent of Utility Operations will review the audit findings and assign corrective action as applicable. A copy of the audit report will be routed to the Director.
9. INDEPENDENT AUDITOR
Public Utilities Code section 8387(c) requires UEU to contract with a qualified independent evaluator with experience in assessing the safe operation of electrical infrastructure to review and assess the comprehensiveness of this Wildfire Mitigation Plan.
UEU will have the Plan reviewed using a contract through the Northern California Power Agency following the initial approval of the City Councilhad the Plan reviewed using Power Engineers in June of 2020 following initial approval of the City Council in November 2019.
The report from the independent evaluator will beis available on UEU’s website. The auditor will present the report and findingsresults of the independent evaluator were presented to the Ukiah City Council at a public meeting on June 17, 2020.
Appendix A
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 22
Ukiah Electric Utility Wildfire Prevention Program
1. Introduction
A. Purpose
The purpose of the Ukiah Electric Utility (UEU) Wildfire Prevention Program is to establish a framework for the electric utility to conduct an effective, coordinated program to prevent catastrophic impacts to its infrastructure from wildfire. This program is a significant component of the UEU Wildfire Mitigation Plan required by SB901. The Program aims to prevent the start of wildfires from utility operations in and around the City of Ukiah.
B. Goals & Objectives
a. Prevent electric utility caused wildfire by identifying hazards that pose a potential threat of ignition.
b. Prioritize prevention efforts by increasing inspections on overhead lines in tier 2 fire threat areas.
c. Improve and increase fuel reduction activities conducted during inspections. d. Develop enhanced inspection techniques using Infrared Technology. e. Develop a drone inspection program for overhead lines. f. Create community awareness for utility wildfire prevention.
2. Strategy/Scope of Work
A. Detailed Corrective Maintenance Program Inspections
UEU performs a service territory-wide inspection of its electric distribution system on inspection cycles outlined by General Order 95 (GO95) and General Order 128 (GO128).
In general, utilities must patrol their systems once a year in urban areas and conduct detailed inspections at a minimum of every three to five years. These inspections help mitigate wildfire risk by providing additional information about the electric distribution system and conditions that could result in ignition.
UEU will implement a detailed inspection of facilities in the Tier 2 areas of the City on an annual basis, in late spring, and expanding the inspections to include additional fuels reduction and vegetation management in mid-summer. The following resources will be used to accomplish this:
• UEU-CPUC Fire Threat Map
• Department Inspection Checklist
As part of its efforts to make its electric system more resistant to wildfires, UEU designed and actively maintains a vegetation management program aimed at keeping trees and brush clear of power lines. In areas where current GO95 rules are currently met, UEU is evaluating and assessing areas where vegetation management may need to exceed GO95 requirements, eliminating vegetation overhang near power lines and increasing the clearance distances. In identified high risk areas that border or are
2019 UEU Wildfire Mitigation Plan
Revision 2
December 16, 2020 23
close to Tier 2 wildfire threat areas, the radial clearance of branches or foliage from bare conductors will be increased to 12’.
UEU’s strategy for conducting its vegetation management program focuses on annual, routine inspections. In 2020, UEU began an electronic tree database to project growth and cycles of trimming needed to maintain clearances. The database includes information pertaining to the tree including species, height, diameter, growth rate and clearance. This history provides UEU information on trimming cycles and which trees require work annually.
UEU’s vegetation management operations are conducted in compliance with the City’s Tree Management Guidelines and the City’s Landmark Tree Program Guidelines and Policies. All debris associated with pruning operations are chipped and recycled.
B. UEU piloted a program utilizing infrared (IR) inspections for overhead distribution equipment in 2019 to identify potential issues on electrical equipment and connections that are not identifiable during visual inspections. These issues could potentially lead to wire down or result in ignition sources on the system. The program proved to be extremely successful identifying several instances that would have resulted in significant outage time and lead the Utility to extend the inspections to include underground facilities. Due to the success of the IR Pilot, UEU intends to create a formalized program for periodic IR inspections. The program will include the assembly of a thermography team that will be responsible for performing quality checks on equipment and facilities. These inspections will initially be performed annually in the high fire threat areas. Frequency of these inspections will be evaluated to determine if yearly inspections are warranted.
C. UEU has enhanced its existing inspection efforts by implementing and utilizing drones.
In spring of 2022, UEU began IR inspections using a drone, providing an up close look at the system infrastructure. This innovative technology is capable of capturing imagery from multiple angles, including above and allows qualified personnel to gain visual perspective that cannot be gained from ground inspections. The images and data obtained by these inspections will be evaluated by engineering staff to assess risk, determine trends and patterns of infractions. Drone technology has the potential to rapidly detect problems before they become a safety issue.
D. UEU will coordinate with the City Manager’s office to educate the public on the UEU’s wildfire prevention activities. Dissemination of information will be done through a variety of channels such as UEU’s quarterly newsletter, Facebook and the City’s website.
Formatted: Indent: Left: 0"
Esri, Garmin, GEBCO, NOAA NGDC, and other contributors
State of California - Public Utilities Commission
CPUC Fire-Threat Map
Adopted by CPUC January 19, 2018
µ0 15 30 60 90 120
Miles
For more information about the data and map depicted,
or other matters related toUtility wildfire safety,
please contactTerrie Prosper [email protected] Basemap sourced from ESRI (World Oceans).
The data portrayed in the CPUC Fire-Threat Map were developed under Rulemaking 15-05-006, following procedures in Decision (D.) 17-01-009, revised by D.17-06-024, which adopted a work plan for the development of a utility High Fire-Threat District (HFTD) for application of enhanced fire safety regulations.The aforementioned decisions ordered that the HFTD be comprised of two individual map products. One of those map products is this CPUC Fire-Threat Map.The CPUC Fire-Threat Map depicts areas where enhanced fire safety regulations found in Decision 17-12-024 will apply.The final CPUC FireThreat Map was submitted to the Commission via aTier 1 Advice Letter that was adopted by the Commission's Safety and Enforcement Division (SED) with a disposition letter on January 19, 2018. All data and information portrayed on the CPUC Fire-Threat Map are for the expressed use called out in D.17-12-024, and any other use of this map are not the responsibility or endorsed by the Commission or it's supporting Independent ReviewTeam.
Fire-ThreatAreas
Tier 2 - Elevated
Tier 3 - Extreme
Counties
Agenda Item No: 7.e.
MEETING DATE/TIME: 6/15/2022
ITEM NO: 2022-1751
AGENDA SUMMARY REPORT
SUBJECT: Notification of Publishing Services Agreement by Ukiah Daily Journal for Fiscal Year 2022/2023, in the Amount of $6.25 per Column Inch for the First Insertion and $4.26 per Column Inch for Each Subsequent Insertion of the Same Advertisement.
DEPARTMENT: City Clerk PREPARED BY: Kristine Lawler, City Clerk PRESENTER: Consent Calendar
ATTACHMENTS:
1. Legal contract-City of Ukiah eff 2022-2023
Summary: Council is given the notification of the 2022/2023 legal publishing service rates from the Ukiah Daily Journal.
Background: As the Ukiah Daily Journal is the only newspaper that qualifies for the designation as “a newspaper having general circulation” in Ukiah, a formal process requesting bids for legal publishing services was not used.
Discussion: The Ukiah Daily Journal submitted a letter outlining its proposed 2022/2023 fiscal year contract rates for legal advertising with the City of Ukiah (Attachment #1). There is no increase from the 2021/2022 rates. The proposal is $6.25 per column inch for the first insertion, and $4.26 per column inch for each subsequent insertion for the same advertisement, remaining the same as the last ten years.
Upon approval by the City Council, Staff will issue a Purchase Order to the Ukiah Daily Journal for legal advertising costs.
Recommended Action: Receive and approve notification/agreement of the legal publishing services of Ukiah Daily Journal for fiscal year 2022/2023, in the amount of $6.25 per column inch for the first insertion, and $4.26 per column inch for each subsequent insertion for the same advertisement.
BUDGET AMENDMENT REQUIRED: No
CURRENT BUDGET AMOUNT: 20012500.52150: $5,000
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: UDJ
June 8, 2022
Kristine Lawler
City of Ukiah
463-6213
Ukiah, California 95482
Dear Kristine Lawler,
This letter serves as our proposed rate structure between the Ukiah Daily Journal and the City of Ukiah for legal advertising for the period of July 1, 2022 to June 30, 2023.
The Legal Advertising rates for the City of Ukiah will remain the same, as the past several years, at $6.25 per column inch for the first insertion and $4.26 per column inch for each subsequent insertion of the same advertisement.
In addition to the following guidelines, all contract terms, conditions and general information specified on The Ukiah Daily Journal’s current rate card (available online) apply to this agreement between The Ukiah Daily Journal and the City of Ukiah:
Errors and omissions: The Ukiah Daily Journal is liable only for the cost of the space containing an error and is not responsible for costs associated with omissions. Legal ads received and published after established deadlines will not be eligible for credit or a re-run in case of error.
During future PG&E power shutdown events; or shelter-in-place orders that impact either Lake County or Mendocino county, legal ad deadlines will be a week in advance.
Copy Acceptance: copy for legal ads will be accepted from printed copy, via email (as a text attachment only), and on a CD (in text format only) if too large to email.
Proofs will be made available for copy received before deadline upon request. Second requests for tear sheets after 30 days from publication are to be provided by electronic means (adobe PDF format). These may incur an additional charge of $5 per request.
Requests for ads to run after published deadline will be considered as space and time allows, with no guarantee of publication. Cancellations: Ads canceled after published deadlines will incur a 25% cancellation penalty, if indeed we have not printed said ad, in those cases the charges will stand.
Advertiser must notify The Ukiah Daily Journal within 30 days of receipt of bill of any discrepancies. The bill will be due in full 15 days upon receipt. Finance charges will not be waived for amounts due over 120 days.
Any previous contracted terms expire 30 days after the date of this notice.
Thank you,
Kevin McConnell
Publisher
The Ukiah Daily Journal
Mendocino County’s
Local newspaper
The Ukiah Daily Journal
617 S. State St.
Ukiah, CA. 95482
ATTACHMENT 1
Agenda Item No: 7.f.
MEETING DATE/TIME: 6/15/2022
ITEM NO: 2022-1754
AGENDA SUMMARY REPORT
SUBJECT: Requesting Council to Reject All Proposals Received and Reinitiate A Request for Proposal Process for the Replacement of the Todd Grove Park Large Playground.
DEPARTMENT: Community Services PREPARED BY: Neil Davis, Community Services Director PRESENTER: Neil Davis, Community Services Director
ATTACHMENTS:
1. Miracle_ToddGrovePark-RFP-FINAL-MPI
2. SimpsonRFP
3. ParkPlanetRFP
Summary: Council will consider Staff's request to reject all proposals received and direct staff to reinitiate a Request for Proposal process for the replacement of the Todd Grove Park large playground.
Background: The City’s Todd Grove Park is the flagship park of the City and has a variety of deferred maintenance needs. The large playground is a key feature of the park and is in need of replacement due to its age. Staff applied for and received Prop 68 funding to pay for the replacement. A Request for Proposals was developed and released. Three proposals were received.
Discussion: As a key feature of the City’s flagship park, the large playground structure at Todd Grove Park plays a key role in establishing Todd Grove Park as a regional attraction. The large playground is widely considered to be the most desirable playground in the Ukiah Valley. Any replacement of the structure will need to be at least close to the same size and should include a variety of high-value recreational elements that maintain its position as the preeminent playground in the Valley.
Staff evaluated and scored the three submitted proposals using a rubric based on the Request for Proposals (RFP) document. One proposal (Attachment 1) was ruled out due to an unmet licensing requirement, leaving only two proposals to consider. The remaining two proposals received relatively low scores (Attachment 2 and Attachment 3). The poor scores were primarily due to the proposed structures not living up to the standard of the current playground.
Staff proposes updating the proposal to broaden the qualifying criteria for licensing with the hopes that a larger sample of proposals will be received. Additionally, further clarification will be added to the proposal to guide applicants to the kinds of features that will impress the scorers. Once updated, the RFP will be re-released and the process will begin anew.
Recommended Action: Reject all proposals received and authorize staff to reinitiate a Request for Proposal process for replacement of the large playground equipment at Todd Grove Park.
BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: N/A
Proposal for
Todd Grove Park
Playground Equipment Replacement
May 26, 2022
PREPARED FOR:
City of Ukiah
Attn: Mary Horger
411 West Clay Street
Ukiah, CA 95482
707.354.2401
[email protected]
PREPARED BY:
Miracle Playsystems
Shana Friesen, Client Services Manager
P.O. Box 263, Alamo, CA 94507
(C) 510.514.5212
[email protected]
Attachment 1
TABLE OF CONTENTS
A. Cover Letter
About the Firm
Your Team
B. Site Plan and Renderings
Option #1
Option #2
C. List of Components
Option #1
Option #2
D. Catalog Cuts of Equipment
Option #1
Option #2
E. Color Chart
Anti Microbial Coatings
F. Scope of Work
Project Understanding
Scope of Work Option #1
Scope of Work Option #2
G. Manufacturer Warranty
Miracle Advantage
Eco-Friendly Playground Equipment
Compliance and Quality Control
H. Proposed Project Schedule
I. Cost Proposal
J. References
K. Subcontractors
L. Exceptions
01 02
03 04
12 24
25 26
32 39
42 43
44 46
48 50
51 52
53 54
56 59
60
May 26, 2022 City of Ukiah
Todd Grove Park
Mary Horger, Financial Services Manager
411 West Clay Street
Ukiah, CA 95482
Miracle Playsystems P.O. Box 263, Alamo, California, 94507 Telephone: 800-879-7730 DIR: 1000015853
CSL: 981433
Dear Ms. Horger,
Thank you for considering Miracle Playsystems for your playground replacement project at Todd Grove Park, we are excited about the opportunity and look forward to working with you! We have included a proposal for the developmentally appropriate equipment specific to your play area along with general information requested in your request for proposals. I have visited the site and been very busy compiling project details with our team to ensure a smooth process.
My understanding of the work to be performed includes: providing all necessary labor, materials and equipment and incidentals to provide and install new 5-12 age appropriate playground equipment in our Design Option #1 and 2-5 and 5-12 playground equipment in our Design Option #2, including engineered wood chips for the base under the new equipment. Our price proposal will include complete site prep and installation as well as demo and disposal of existing playground structure, complete install of new playground equipment, upgrade of existing path and ramp to meet current ADA requirements. Our equipment proposed is the newest and latest models in current production.
Miracle Playsystems passion is to create inclusive, innovative and exciting playgrounds to enrich communities. Our dedicated team of sales, design, and playground construction experts will help you through each phase of your project, ensuring the utmost quality, value, and outstanding customer service. Our creative staff continually educates clients on the newest trends in playscape design and cost-effective ways to use them. Designing compliant and exciting play spaces and providing exceptional customer service are always our primary concerns.
Miracle Playsystems commitment to our clients includes offering the right price on the most extensive selection of equipment that meets the industry’s highest standards of safety, durability, structural integrity and accessibility around the world. We will be proposing a range of products to help you make your playground accessible to children and caregivers of all abilities. Each playground is designed to welcome everyone of different ages and abilities and supports the following five fundamentals:
1. Provide multi-sensory play experiences
2. Encourage all children to play together
3. Allow greater accessibility
4. Ensure kids do not get overwhelmed
5. Create welcoming social environments
Each piece of equipment is carefully designed for safety and undergoes rigorous testing to ensure that it meets the highest standards. Our commitment to providing a safe, positive environment for children to play begins with meeting and/or exceeding safety performance specifications established by organizations and regulatory bodies such as: ASTM, CPSC, CPSIA, IPEMA, CSA, EN. We not only comply with these standards and guidelines, but we also actively participate with ASTM and CPSC in their development and are active members of IPEMA.
This proposal package including quote for product and services is a firm, irrevocable offer which is good for 90 days from the date of quote.
If you have any questions regarding this proposal and accompanying information, please contact me at 510.514.5212 or [email protected].
Thank you,
Shana Friesen
Miracle Playsystems
01 Cover Letter
02 Cover Letter
Miracle Playsystems is built on a foundation of playground construction knowledge and interest in design innovation. Initially establishing Miracle Construction Company in 2004, Kit Steven started out in the construction industry installing playgrounds. He moved from construction to sales by purchasing the Northern California Miracle Recreation distributorship. This brought together 30+ years of experience passed from Dale Green Associates to John Harris and Associates to Miracle Playsystems and has built the small business into what now includes sales and service of everything play and park related from Central CA up to the Oregon border. Miracle Playsystems is now the largest play equipment design, distribution, and specialty contracting firm serving Northern and Central California; providing public agencies and architects with unique and visually stunning design solutions.
Creating inclusive, innovative and exciting playgrounds to enrich communities is our passion. Our dedicated team of sales, design, and playground construction experts will help you through each phase of your project, ensuring the utmost quality, value, and outstanding customer service. Our creative staff continually educates clients on the newest trends in playscape design and cost-effective ways to use them.
Although designing compliant playgrounds is always our primary concern, creating contemporary and exciting playgrounds for communities is our true passion.
For more information about our firm visit:
www.miracleplaygroup.com/our-story
DIR: 1000015853
CSL: 981433
About the Firm
03 Cover Letter
Shana Friesen will serve as the Project Manager and Point of Contact for this project. Shana works with various agencies on projects all across Northern California. She is committed to being your project manager and will be for the duration of the project.
Shana is backed by a team of inside support help. Together they work as a team to keep your project moving. Dana Thomas supports the market development of her territory and also gives design support, Kim Downes is your primary designer for the project, Kristine Baguiao-Garcia is her inside sales support person, helping with quotes and order management, Stefanie Parks is her Accounting specialist. The entire team is supported by Kit Steven, Owner/Principal and Tracey Lydon, Principal/Operations Manager.
Shana has a background in Business/Marketing with many years of experience working for local, prominent landscape architects in the Sacramento region as a Marketing Manager and Client Services Manager.
She came to Miracle Playsystems over 4 years ago as their Marketing Manager, working on various tasks such as website development, social media, blog writing, and graphics and Proposal developer. This experience, as well as her experience with customer coordination and management, made her a perfect choice for her latest role as Miracle Playsystem's Client Services Manager for the North Bay and East Bay Territories. Shana has strong organizational skills, exceptional knowledge of all product lines offered by Miracle Playsystems and is a trained expert in inclusive play. She works hard for her clients and with the help of her team, makes sure they are happy with their completed project.
In her free time, Shana enjoys many outdoor activities with her husband and two daughters near their northern California home. She loves to RV camp on the coast and in the redwoods of northern CA, boat at many of the local lakes surrounding her, and hit the beach for some sun and relaxation. Her daughters love to "playground model" for Miracle Playsystems and can be seen in many pictures on our website and marketing material. They love that mom gets to "design play" and they reap the benefits!
Your Team
04 Site Plan and Renderings
Todd Grove Park - Option #1
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
Todd Grove Park
Ukiah, CA
Prepared for: City of Ukiah
Prepared By
Shana Friesen
Client Services Manager
Miracle Playsystems Inc
[email protected]
(510) 514-5212
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_002
Multi-Sensory Play Elements
Vestibular (movement and balance)
Proprioceptive (body position)
Tactile (touch)
Auditory (hearing)
Visual
Olfactory
Elements of Play
Accessibility
• Protective, shock-absorbing unitary surfacing
• Wide movement routes
• Smooth, even transitions on and off equipment
All Children Encouraged to Play
• Providing a graduated range of challenge
• Grouping similar equipment together
• Offering equipment for multiple age groups
• Providing real choices of play for each child
Opportunity for Calm
• Offering cozy, quite spaces
• Establishing perimeter paths and fences
• Providing a wayfinding system that includes an orientation path Social Environments
Solitary play - Children play alone
Onlooker play - Children watch others play but do not engage in play Parallel play - Children play next to each other but are engaged in their own activities Associative play - Children are still playing independently but often do the same thing as others Cooperative play - Children interact together for the purpose of play
Dark Gray Anti-Microbial Desert
Dunes
Anti-Microbial
Safari
Silver Graystone Brownstone Light Gray Forest Green
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_002
Colors Used In Rendering: *Colors shown in rendering are for illustrative purposes only. Actual color and pattern may vary slightly.
MEGA TOWER
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_002
*Colors shown in rendering are for illustrative purposes only. Actual color and pattern may vary slightly.
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_002
*Colors shown in rendering are for illustrative purposes only. Actual color and pattern may vary slightly.
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_002
*Colors shown in rendering are for illustrative purposes only. Actual color and pattern may vary slightly.
12 Site Plan and Renderings
Todd Grove Park - Option #2
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
Todd Grove Park
Ukiah, CA
Prepared for: City of Ukiah
Prepared By
Shana Friesen
Client Services Manager
Miracle Playsystems Inc
[email protected]
(510) 514-5212
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_003
Multi-Sensory Play Elements
Vestibular (movement and balance)
Proprioceptive (body position)
Tactile (touch)
Auditory (hearing)
Visual
Olfactory
Elements of Play
Accessibility
• Protective, shock-absorbing unitary surfacing
• Wide movement routes
• Smooth, even transitions on and off equipment
All Children Encouraged to Play
• Providing a graduated range of challenge
• Grouping similar equipment together
• Offering equipment for multiple age groups
• Providing real choices of play for each child
Opportunity for Calm
• Offering cozy, quite spaces
• Establishing perimeter paths and fences
• Providing a wayfinding system that includes an orientation path Social Environments
Solitary play - Children play alone
Onlooker play - Children watch others play but do not engage in play Parallel play - Children play next to each other but are engaged in their own activities Associative play - Children are still playing independently but often do the same thing as others Cooperative play - Children interact together for the purpose of play
Hunter Green Lime Graystone Forest Green Metallic Gray Green MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_003
Colors Used In Rendering: *Colors shown in rendering are for illustrative purposes only. Actual color and pattern may vary slightly.
MEGA TOWER
FREESTANDING
CLIMBERS
ADA TRANSFER
POINT
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_003
*Colors shown in rendering are for illustrative purposes only. Actual color and pattern may vary slightly.
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_003
*Colors shown in rendering are for illustrative purposes only. Actual color and pattern may vary slightly.
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_003
*Colors shown in rendering are for illustrative purposes only. Actual color and pattern may vary slightly.
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_003
Multi-Sensory Play Elements
Vestibular (movement and balance)
Proprioceptive (body position)
Tactile (touch)
Auditory (hearing)
Visual
Olfactory
Elements of Play
Accessibility
• Protective, shock-absorbing unitary surfacing
• Wide movement routes
• Smooth, even transitions on and off equipment
All Children Encouraged to Play
• Providing a graduated range of challenge
• Grouping similar equipment together
• Offering equipment for multiple age groups
• Providing real choices of play for each child
Opportunity for Calm
• Offering cozy, quite spaces
• Establishing perimeter paths and fences
• Providing a wayfinding system that includes an orientation path Social Environments
Solitary play - Children play alone
Onlooker play - Children watch others play but do not engage in play Parallel play - Children play next to each other but are engaged in their own activities Associative play - Children are still playing independently but often do the same thing as others Cooperative play - Children interact together for the purpose of play
Hunter Green Lime Graystone Forest Green Metallic Gray Green MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_003
Colors Used In Rendering: *Colors shown in rendering are for illustrative purposes only. Actual color and pattern may vary slightly.
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities
MIRACLE PLAYSYSTEMS. DESIGNING PLAY
Creating Fun Play Environments to Enrich Communities 05/20/2022 21_0491_Todd Grove Park_003
*Colors shown in rendering are for illustrative purposes only. Actual color and pattern may vary slightly.
24 Model Description Qty
71452027 HEPTAGON MEGA TOWER 1
7146798 SKYWARD CLIMBER 1
7149748 WIGGLY WORM CLIMBER 1
714796P1 BELL 1
7148465 THERAPEUTIC HANDRINGS 1
7147135B DOOR (BELOW DECK) 1
714742143R "S" TUBE SLIDE RH 1
7148301 FULL ENCLOSURE W/SEAT 2
7148306 LEAN OUT ENCLOSURE 2
71483012 FULL ENCLOSURE WALL 1
7148627 PERF STEEL HEPTAGON ROOF 1
7149939 ADA STAIRS 1'6" RISE 1
7145029 DECK 2
7148062 HULA CLIMBER 1
7145019 DECK 4
71485149 TRANSFER POINT 1
7149599 ADA STAIRS 2' RISE 1
714986 INCLINED BRIDGE LOOP CLIMBER 1
714670U CHAMELEON II VORTEX SLIDE 1
714670EZ Entry Section 1
7146707 Long Straight Section 1
714670PZ CHAMELEON II SLIDE 1
714742141 TUBE SLIDE STRAIGHT 1
714967 CURVED CLIMBER 1
7149929 KIDS' PERCH 2
7146088 WAVY WEDGE WALL WALKER 1
7146386 GROOVE II SLIDE 1
7147225 SERPENT TREK 1
7148155 END LADDER 1
7148135 DECK ENCL 1
7148435 CHINNING BAR 1
714782 CRUNCH STATION 1
7146384U GROOVE II SLIDE VORTEX 1
7146934 HEX CLIMBER TO 4' DK 1
7146193 POD HOPPER 1
7148624 PERF STEEL SQUARE ROOF 2
714816 WALL 2
7147139B ALEX LEMONADE STAND (BELOW DECK) 1
7147721 BONGO PERCH 2
7148172B BENCH (BELOW DECK) 1
714900P1 STEERING WHEEL (POST MOUNT) 1
714552 5" OD X 136" POST 552 ..(3'-5' DECK).. 6
7145494 5" OD X 124" POST 549-4 ..(4' DECK).. 1
714553 5" OD X 160" POST 553 ..(5'6"-6'6" DECK) 3
714551 5" OD X 106" POST 551 ..(=< 2'6" DECK) 1
714573 5" OD X 168" ROOF 573 ..(3'6"-5' DECK). 4
714574 5" OD X 186" ROOF 574 ..(5'6"-6'6" DECK). 4
714812 12" RISER 1
4621 ISOTOPE 1
7148302 UPPER ENCLOSURE 2
7148627C CUPOLA 1
5-12 Structure
List of Components
Todd Grove Park - Option #1 (5-12 Structure)
25 Model Description Qty
7145039 DECK 2
71469214 SHUTTLE CLIMBER 1
7148109 1' ADA STAIR 1
7145109 DECK 1
714787 TOT ROCK CLIMBER 1
7146384 GROOVE II SLIDE 1
71471520 KC INTERACTIVE PANEL FRAME ONLY 1
71471313 SENSORY PANEL TEXTURED SQUARE OVAL 1
7147135B DOOR (BELOW DECK) 1
714796P1 BELL 1
71460211 STEEL WINDOW PANEL 1
714633 HOW TALL RU PANEL 1
714782 CRUNCH STATION 1
714670U CHAMELEON II VORTEX SLIDE 1
714670EZ Entry Section 1
7146704 Short Straight Section 1
714670PZ CHAMELEON II SLIDE 1
714967 CURVED CLIMBER 1
71485139 TRANSFER POINT 1
714700 SIDE-BY-SIDE SLIDE 1
7145493 5" OD X 112" POST 549-3 ..(3' DECK).. 2
7148626 PERF STEEL HEXAGON ROOF 1
714573 5" OD X 168" ROOF 573 ..(3'6"-5' DECK).. 6
7148624 PERF STEEL SQUARE ROOF 1
714572 5" OD X 144" ROOF 572 ..(=< 3' DECK).. 4
714715206 MAGICAL MUSIC INSERT 1
7148626C CUPOLA 1
2-5 Structure
5-12 Structure
Model Description Qty
7145237 HEPTAGON MEGA TOWER 1
714796P1 BELL 1
714816 WALL 2
7148173B SINGLE POD SEAT 1
714967 CURVED CLIMBER 1
714900P1 STEERING WHEEL (POST MOUNT) 1
7149599E ADA STAIRS 2' RISE EXT 1
7145109 DECK 1
714900 WALL W/WHEEL 1
714719 CLIFF CLIMBER 1
71486859 M'THERM STEPS 2' DK OPN/HR 1
7147721 BONGO PERCH 7
714817 WALL W/BENCH 2
7146022 BUTTERFLY STEEL PANEL 1
7149929 KIDS' PERCH 1
714716 VIEW GROOVE 1
7148627 PERF STEEL HEPTAGON ROOF 1
7146193 POD HOPPER 1
47523 LOOPZ 3 RING CLIMBER 1
7146045 INVERTED HORIZ./ LOOP LADDER 1
71481552 END LADDER 1
Model Description Qty
714850 CHAMELEON SLIDE 2
7148501 Section - Straight 4
7148502 Section - Right Turn 5
7148503 Section - Left Turn 5
714850Z Slide Exit ( 10' ) 2
4561 TARANTULA CLIMBER 1
71474949U 405 TYPHOON SLIDE DOMED WAVE 1
7146155 MONSTER PIPE STRAIGHT 1
714851459 TRANSFER POINT 1
714551 5" OD X 106" POST 551 ..(=< 2'6" DECK).. 4
7145494 5" OD X 124" POST 549-4 ..(4' DECK).. 4
7148645 HANDRING BRIDGE 1
714552 5" OD X 136" POST 552 ..(3'-5' DECK).. 4
7148135 DECK ENCL 1
714961R1 DELIGHT-O-SCOPE TELESCOPE 1
7148627C CUPOLA 1
714850CZ Leg C - 114 1/4" 2
714850BZ Leg B - 84-1/2" 2
714850AZ Leg A - 56" 2
List of Components
Todd Grove Park - Option #2 (2-5 and 5-12 Structure)
26 Catalog Cuts of Equipment
Todd Grove Park - Option #1
27 Catalog Cuts of Equipment
Todd Grove Park - Option #1
28 Catalog Cuts of Equipment
Todd Grove Park - Option #1
29 Catalog Cuts of Equipment
Todd Grove Park - Option #1
30 Catalog Cuts of Equipment
Todd Grove Park - Option #1
31 Catalog Cuts of Equipment
Todd Grove Park - Option #1
32 2-5 Structure
Catalog Cuts of Equipment
Todd Grove Park - Option #2
33 2-5 Structure
Catalog Cuts of Equipment
Todd Grove Park - Option #2
34 2-5 Structure
Catalog Cuts of Equipment
Todd Grove Park - Option #2
35 5-12 Structure
Catalog Cuts of Equipment
Todd Grove Park - Option #2
36 5-12 Structure
Catalog Cuts of Equipment
Todd Grove Park - Option #2
37 5-12 Structure
Catalog Cuts of Equipment
Todd Grove Park - Option #2
38 5-12 Structure
Catalog Cuts of Equipment
Todd Grove Park - Option #2
39 Color Chart
Miracle Recreation
40 Color Chart
Miracle Recreation
41 Color Chart
Miracle Recreation
42 Color Chart
Anti-Microbial Coatings
Problem:
Transmission of Communicable Diseases
As in all public areas, playgrounds can be a place where children transfer bacteria that may cause/carry communicable diseases. As a leading playground equipment manufacturer, we're doing our part to help defend kids against the spread of germs and the risk of disease transmission.
Solution:
Mira-Cote by Miracle Anti-Microbial Coatings for posts, rails, climbers and swing frames contain a compound that inhibits the growth of bacteria that may cause diseases. These coatings cover gripping points on play structures - places where kids hands touch most frequently.
Our proprietary anti-microbial treatment helps protect your children and your playground from bacteria and the wide range of problems that germs can create.
Features & Benefits
Minimizes growth of bacteria, fungus and algae on equipment surfaces Helps reduce odors and stains on play components
Works to make playground surfaces and equipment resistant to mold and mildew Assists in keeping playgrounds looking attractive
Ten color choices (see below)
43 Scope of Work
Todd Grove Park is located in the heart of Ukiah on Live Oak Avenue. The park has a little something for everyone in the community. The expansive 16 acre park has playgrounds, volleyball, horseshoe pits, amphitheater, shaded areas, picnic areas and barbecues. The community pool which offers swim classes, pool rental, and public swim sessions is across the way from the playground. The park is a hub for many community events such as "Sunday's in the Park", movie nights, community yard sales, and many gathering with friends and families enjoying a lazy afternoon at the park for birthday parties and other celebrations. Todd Grove Park is a definite Ukiah Gem!
The current playstructures are starting to show their age. The HAGS wooden structures have held up thru the years but we understand the maintenance issues with an all-wooden structure. The maintenance department mentioned how hard it is to clean up graffiti and find that people carve stuff into the wood as well. It is also hard to make repairs as the structure is outdated. Overall while the structure has held up for the last 15+ years, it needs a modern, low maintenance, new and exciting structure upgrade that is able to withstand the high traffic this park attracts while lasting for many years to come. We are proposing 2 options.
Project Understanding
44 Option #1 we propose to replace the 5-12 structure with a new, innovative, massively huge structure with lots of slides and climbing elements to excite and entice the children of the community. This 5-12 Mega Tower structure from Miracle Recreation encompasses the 5 elements of play in the design. There are multi-sensory play elements such as 5 slides that encourage vestibular (movement and balance), climbing elements such as the Isotope climber which encourages proprioceptive (body position) movement, a bell which engages the sense of auditory. The graduated range of challenging play from lower slides and climbers to high, massive slides provides a way for all children to play together. The ADA steps and transfer points on multiple areas of the equipment offer accessibility for children with limited mobility. There is opportunity for calm with quiet cozy spaces hidden below the decks of the structure. Lastly, the entire playstructure encourages socialization with play. There are areas for solitary, onlooker, parallel, associative and cooperative play. The look of the structure is simple, modern and the colors complement the surrounding landscape of clusters of trees, open spaces and nature.
Scope of Work
Todd Grove Park - Option #1
45 The scope of services for Option #1 shall include tasks described below:
SCOPE OF WORK: The scope of work is to include all necessary labor, materials and equipment and incidentals to provide and install new playground equipment, including border and engineered wood chips for the base. • Project Location: The proposed project is to be located in the existing playground area on the eastern edge of the park along Live Oak Avenue. The project will consist of removing an existing play structure that has aged and is unrepairable.
The replacement structure will be placed in the same location of the existing, with approximately the same footprint.
The new equipment will be age appropriate for children 5-12 years of age. Also included in the project is an upgrade to the existing path and ramp into the playbox to meet current ADA standards. • Project Guidelines: The project will meet current U.S. Consumer Product Safety Commission (CPSC) and American Society for Testing and Materials (ASTM) guidelines and standards as set forth in the most current Handbook for Public Playground Safety. Configuration of and equal access to all apparatus and areas will comply with the Americans with Disabilities Act (ADA) requirements for public agencies. The project will also meet all American National Standards Institute (ANSI), UL, and Federal requirements/guidelines. • Product Materials: All equipment is to be constructed primarily of metal, plastic, treated/composite wood product, or other suitable material which has been pre-approved by the City. Slide bedways are to be constructed of plastic or composite. The playstructure proposed is comprised of recycled materials. Miracle Recreation is an environmentally conscious company continuously working to improve our processes. Miracle Recreation is certified as compliant with the ISO 14001:2015 standard by our registrar Intertek.
• Site Conditions: Site conditions may include drain inlets/lines, irrigation lines, utility lines, tree roots and/or other obstacles. In no case will the footings be drilled within six (6) feet of any mature trees. Tree canopies or other obstacles will be considered when planning equipment layouts. It is our responsibility to confirm dimensions, locate trees, and ascertain other pertinent conditions. It is our responsibility for all utility identification of the site. We will be responsible for ensuring safety and the security of the site and all equipment and materials during installation. We will provide construction fencing, signage, and any other measures to ensure safety/security. • All services shall be provided in accordance with the City's draft agreement. • Demolition and disposal of existing 5-12 playground structure, bollard on inside of gate and old ADA ramp • Remove and redistribute EWF under new construction to the other parts of the playbox to fill box • Complete installation of new 5-12 playground equipment • Equipment will be newest and latest model in current production • Upgrade existing path and ADA ramp into playbox to meet current ADA requirements. Concrete path shall be the same width as existing path to end at outside (eastern) edge of the historic rock gate. The path should be at a level that allows the gate to swing closed and should be flush with existing asphalt. • Install and spread new EWF under new playground structure • Once project is complete, we will provide a written guarantee, parts list, recommended maintenance schedule, installation manual and specifications, documentation of compliance with CPSC, ASTM, and ADA guidelines, warranty and two sets of any specialized assembly and/or maintenance tools for all equipment.
Scope of Work
Todd Grove Park - Option #1
46 Option #2 we propose to replace the 2-5 and 5-12 structure with two new, innovative structures that complement each other and the environment. The 2-5 structure and 5-12 Mega Tower structure from Miracle Recreation encompasses the 5 elements of play in the design. There are multi-sensory play elements such as 3 slides on the 5-12 and 3 slides on the 2-5 that encourage vestibular (movement and balance), climbing elements such as the Tarantula climber and Loopz 3 Ring climber on the 5-12 and the Tot Rock Climber on the 2-5 which all encourage proprioceptive (body position) movement, a bell and music panel which engages the sense of auditory.
The graduated range of challenging play from the lower typhoon slide and higher Chameleon slides and a large range of climbers provides a way for all children to play together. The ADA steps and transfer points on multiple areas of the equipment offer accessibility for children with limited mobility. There is opportunity for calm with quiet cozy spaces hidden below the decks of the structure. Lastly, the entire playstructure encourages socialization with play. There are areas for solitary, onlooker, parallel, associative and cooperative play. The look of the structure is simple, modern and the colors complement the surrounding landscape of clusters of trees, open spaces and nature.
Scope of Work
Todd Grove Park - Option #2
47 The scope of services for Option #2 shall include tasks described below:
SCOPE OF WORK: The scope of work is to include all necessary labor, materials and equipment and incidentals to provide and install new playground equipment, including border and engineered wood chips for the base. • Project Location: The proposed project is to be located in the existing playground area on the eastern edge of the park along Live Oak Avenue. The project will consist of removing two existing play structures that have aged and are unrepairable. The replacement structures will be placed in the same location of the existing, with approximately the same footprint. The new equipment will be age appropriate for children 2-5 and 5-12 years of age. Also included in the project is an upgrade to the existing path and ramp into the playbox to meet current ADA standards. • Project Guidelines: The project will meet current U.S. Consumer Product Safety Commission (CPSC) and American Society for Testing and Materials (ASTM) guidelines and standards as set forth in the most current Handbook for Public Playground Safety. Configuration of and equal access to all apparatus and areas will comply with the Americans with Disabilities Act (ADA) requirements for public agencies. The project will also meet all American National Standards Institute (ANSI), UL, and Federal requirements/guidelines. • Product Materials: All equipment is to be constructed primarily of metal, plastic, treated/composite wood product, or other suitable material which has been pre-approved by the City. Slide bedways are to be constructed of plastic or composite. The playstructure proposed is comprised of recycled materials. Miracle Recreation is an environmentally conscious company continuously working to improve our processes. Miracle Recreation is certified as compliant with the ISO 14001:2015 standard by our registrar Intertek.
• Site Conditions: Site conditions may include drain inlets/lines, irrigation lines, utility lines, tree roots and/or other obstacles. In no case will the footings be drilled within six (6) feet of any mature trees. Tree canopies or other obstacles will be considered when planning equipment layouts. It is our responsibility to confirm dimensions, locate trees, and ascertain other pertinent conditions. It is our responsibility for all utility identification of the site. We will be responsible for ensuring safety and the security of the site and all equipment and materials during installation. We will provide construction fencing, signage, and any other measures to ensure safety/security. • All services shall be provided in accordance with the City's draft agreement. • Demolition and disposal of existing 2-5 and 5-12 playground structures, bollard on inside of gate and old ADA ramp • Remove and redistribute EWF under new construction to the other parts of the playbox to fill box • Complete installation of new 2-5 and 5-12 playground equipment • Equipment will be newest and latest model in current production • Upgrade existing path and ADA ramp into playbox to meet current ADA requirements. Concrete path shall be the same width as existing path to end at outside (eastern) edge of the historic rock gate. The path should be at a level that allows the gate to swing closed and should be flush with existing asphalt. • Install and spread new EWF under new playground structures • Once project is complete, we will provide a written guarantee, parts list, recommended maintenance schedule, installation manual and specifications, documentation of compliance with CPSC, ASTM, and ADA guidelines, warranty and two sets of any specialized assembly and/or maintenance tools for all equipment.
Scope of Work
Todd Grove Park - Option #2
48 Manufacturer Warranty
Miracle Recreation Equipment Company
Miracle Recreation Equipment Company warrants its products against structural failure due to defects in materials and workmanship for the warranty periods and material categories prescribed below.
Buyer agrees that products sold by Miracle Recreation Equipment Company carry only the following warranties:
LIMITED WARRANTY FOR AS LONG AS YOU OWN THE PRODUCT: Aluminum deck posts, steel deck posts, VersaLok® fastening system, cast aluminum parts, and stainless steel hardware.
LIMITED FIFTEEN (15) YEAR WARRANTY: All rigid steel playground components, decks, steps, and weldments, rotationally molded and sheet plastic components, plastic lumber, roof panels, and stainless steel slides, except as otherwise specified below.
LIMITED TEN (10) YEAR WARRANTY: Fabric shade steel frames, and Shadesure™ and Colourshade FR fabrics (Note Exception: Limited Five (5) Year Warranty on Shadesure™ fabrics in colors Red, Yellow, Electric Purple, Zesty Lime, Cinnamon, and Olive.) LIMITED EIGHT (8) YEAR WARRANTY:
LIMITED FIVE (5) YEAR WARRANTY:
LIMITED THREE (3) YEAR WARRANTY: Flexible belting, plastic border timbers and accessories, and electronic panel speakers, sound chips, and circuit boards.
LIMITED ONE (1) YEAR WARRANTY:
BUYER’S REMEDY: If any products prove defective or non-conforming under normal use and within the above-prescribed warranty periods and material categories, Buyer must promptly notify Miracle in writing at 878 E. Hwy 60, Monett, MO 65708 USA. Miracle does not warranty that any particular color will be available for any period of time, and reserves the right to discontinue any color for any reason, without recourse by the Purchaser or Owner of the discontinued color. Miracle may elect to inspect the alleged defect at Buyer’s site or at Miracle’s facility. Buyer shall not return products to Miracle unless authorized by Miracle to do so. Authorized returns must be properly packaged and shipped prepaid and insured, at Buyer’s expense. Upon verification of warranty coverage, Miracle may elect, in its sole discretion, to repair defective or non-conforming products, or replace them by delivering products or part(s) of similar functionality free of charge to the site. Miracle’s limited warranties do not cover the cost of labor to remove defective or non -conforming part(s) or to install repaired or replacement part(s). By use of these limited warranties, Buyer accepts their terms and limitations, and waives any rights it would otherwise have to claim or assert that such warranties fail of their essential purpose. Buyer agrees that venue for any court action to enforce these limited warranties shall be in Barry or Greene Counties in the State of Missouri.
LIMITATIONS: All warranty periods begin on the date of Miracle’s invoice. Repaired and/or replacement part(s) are warranted only for the balance of the original limited warranty period. Warranties extend only to the original Buyer/end user for products purchased from Miracle or a Miracle authorized reseller, and are not transferrable.
Warranties apply only to Miracle products that are erected and installed in conformance with Miracle’s installation instructions, and that are maintained and inspected in conformance with Miracle maintenance and operational instructions.
Warranties specifically do not cover Miracle products:
THE FOREGOING LIMITED WARRANTY IS THE SOLE AND EXCLUSIVE WARRANTY FOR SELLER’S PRODUCTS, AND IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, IN LAW OR IN FACT. SELLER SPECIFICALLY DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING, WITHOUT LIMITATION, ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR USE OR PURPOSE, AND ANY IMPLIED WARRANTIES ARISING OUT OF COURSE OF DEALING OR PERFORMANCE OR TRADE USAGE. SELLER SHALL NOT BE
LIABLE FOR ANY INCIDENTAL, CONSEQUENTIAL, EXEMPLARY, SPECIAL, OR PUNITIVE DAMAGES, OR ANY LOSS OF REVENUE, PROFIT OR USE, ARISING OUT OF A BREACH OF THIS WARRANTY OR IN CONNECTION WITH THE SALE, INSTALLATION, MAINTENANCE, USE, OPERATION OR REPAIR OF ANY PRODUCT. IN NO EVENT WILL SELLER BE LIABLE FOR ANY AMOUNT GREATER THAN THE PURCHASE PRICE OF A DEFECTIVE PRODUCT.
Fiberglass signage, accessible swing seats, precast PolyFiberCrete or precast concrete products.
Play Terrain Synthetic Turf safety surfacing against deterioration of specified attenuation performance and appearance.
Integrated shade fabric and components against rot, UV deterioration and defects in materials and workmanship (Note Exception: Limited Three (3) Year Warranty for fabric in shades of red).
Heavy duty diamond barrier mesh and Kidrox™ Climbing Rocks.
Mira-Therm™ PVC coating and PE coating against cracking or peeling.
Park and Site Amenities (i.e. benches, tables, trash receptacles, etc.).
GFRP (Glass Fiber Reinforced Polymer) Products.
Steel core cable nets and rope fittings and connections (Note Exception: Warranty does not cover normal wear and tear such as fraying or facing of cable coating).
Slashproof Swing Seats, 360° Bucket Tot Swing Seats, and Tuff Net no climbing mesh.
Pool slide support structures, stairways, landings and railings.
All other products, components and custom pieces that are not specifically listed above, including, without limitation, all moving parts, such as swing hangers and bearings, swivels, chains, whirls, springs and flexible components, and all high wear items, such as trolleys, cables, wheels, and bumper stops related to rail and cable ride products. for cosmetic damage or flaws occurring under normal use, such as surface scratches, minor chips, hairline cracks, dents, marring, efflorescence, color fade (except for shade fabric as noted above), discoloration, corrosion/rust, fraying, or warping of recycled plastic lumber; that have been modified, altered, or repaired by unauthorized third parties; that have not been used as designed or intended, or misused; to which non-Miracle parts have been added or substituted; that have been removed from their original location and re-installed elsewhere, without pre-approval by Miracle; or that have been damaged due to excessive wear and tear, vandalism, abnormal use, abuse, negligence, environmental factors (such as wind-blown sand, salt spray, or airborne emissions from industrial sources), extreme weather (such as hail, flooding, lightning, tornados, sandstorms, earthquakes, or wind storms), and acts of God.
49 MIRACLE RECREATION EQUIPMENT COMPANY
BRINGS YOU THE THRILLS OF A LIFETIME!
Miracle is one of the nation’s first and most innovative playground equipment manufacturers. We first began
shaping the future of play in 1927 when our founder Johnnie Ahrens created the Whirl — a tilting, kid- powered merrygo-round — based on the timeless insight that, “Kids want action.” That same inspiration has driven 90+ years of
innovation, including the introductions of the first
fiberglass slide (1963), the 25- foot Mega Tower®
(2000s), and the Avalanche Inclusive Slide (2015). Our
latest advance, the Extreme Generation adventure
playground, delivers challenging physical events for kids seeking extreme play. Its design brings play to new heights, with innovative, fully-enclosed skyways that provide
elaborate rope-course-inspired activities far above ground, safely adding an element of perceived risk to any play space.
This never-ending dedication to innovation is the reason why, even after more than 90+ years, the Miracle legacy remains focused on building yours. We believe the
experience of building a playground should be as intuitive as playing on it. From design, specification, funding,
purchasing and installation, we’ll be with you every step of the way. Our customized design process is free because
there should never be a charge to dream.
Let’s get you started by envisioning a playground that is meant for your community and right for your budget. It’s why our legacy has always been about building yours.
50 Miracle Advantage
We believe the experience of building a playground should be as intuitive as playing on it. From design, specification, funding, purchasing and installation, we’ll be with you every step of the way. Our customized design process is free because there should never be a charge to dream.
Our clamp design features a stainless steel,
tamper-resistant fastener that eliminates the
need for stacking multiple clamps.
Versalok
This textured vinyl coating for deck surfaces
helps prevent rapid heat transfer, while the
circle pattern keeps little fingers safe.
Mira-Therm™
The 3D textured pattern makes it easy —and
comfortable — for kids to make their next
moves.
Gator Grip
Provides superior strength and durability,
advanced color fastness and UV resistance.
Compound Resin
We’re committed to providing equipment that meets and/ or exceeds the performance safety specifications established by organizations such as ASTM, CPSC, CSA, CPSIA, IPEMA and EN. To verify product certification, visit www.ipema.org.
Safety
51 Eco-Friendly Playground Equipment
Miracle Recreation® Making a Better World for Our Children As a manufacturer, it’s our responsibility to do what we can to create a healthy, sustainable future for generations to come. Our dedication to green practices encompasses multiple aspects of our company – including our manufacturing practices and the products we develop.
ISO 14001 Certified
The Miracle Recreation® environmental management system was certified as compliant with the ISO 14001:2015 standard by our registrar Intertek. We are an environmentally conscious company continuously working to improve our processes. Here are some steps we’ve taken to ensure that we meet those standards:
Slashing waste through improved technology and processes Selling unused plastic regrind to keep it out of landfills Recycling damaged plastic molded parts to manufacture Border Timbers Recycling all steel cutoffs into new steel
Implementing new corrugated, battery and plastic recycling programs ISO 14001
Certification requires continual improvement, so we’ll keep working to reduce pollution and waste for a healthier earth.
LEED Points
LEED stands for Leadership in Energy and Environmental Design. If you’re looking to “go green” in your community, we can help your organization meet its green building goals by providing up to 9 LEED points. Achieving these points not only helps create healthier, more environmentally friendly projects, but also confirms your environmental commitment to your community. Ask your local Miracle Recreation representative for more information.
52 Compliance and Quality Control
Honest Price Promise
For the past 91 years, we've built our company on integrity, customer service and quality at honest prices.
We don't intend to stop doing that anytime soon. Our promise is to provide you with the best solution for your playground needs, with no gimmicks or misleading terms.
Give us a chance to give you a better price. Just provide us any competitive quote, along with a drawing, and we will design a play structure of equal or better play value. Thank you for the opportunity to earn your business.
Safety That Protects Kids First, But Never Forgets FUN! Miracle designs and tests all equipment to meet or exceed the American Society for the Testing of Materials (ASTM) Standards, and the Consumer Product Safety Commission (CPSC) Guidelines.
Compliance is certified by the International Play Equipment Manufacturer's Association (IPEMA).
Quality That's More Than Just a Claim
Only the highest quality, longest lasting, environmentally sound construction materials are used ISO 14001: 2004 Certification in 2008 for healthier, more sustainable manufacturing processes ISO 9100 Certificate for maintaining stringent standards in design, production, testing and quality control
UV stabilizers added to plastic and paint colors for long-lasting fade resistance Chip and scratch-resistant, powder-coated steel parts and innovative deck coating process Our triple "Flo-Coat" galvanized steel tubing provides protection against corrosion and is backed with a 100-year warranty as long as you own the product Optional coatings featuring anti-microbial additives available Choose from thousands of combinations and cutting-edge custom designs Our expert staff of designers, innovators, engineers and fabricators build high-quality, safe and durable play spaces
Our Custom Design Studio is ready to collaborate with you on any theme or unique design request Wide range of decks, climbers and slides
24 standard powder-coat paint colors
10 anti-microbial powder-coat paint colors
25 plastic colors
6 deck colors
All playgrounds designed for maximum play value
Designs that help every child play
Compliance with American Disabilities Act (ADA) Accessibility Guidelines for Play Areas Pioneering universally designed playgrounds for kids of all ages and abilities
53 Proposed Project Schedule
Jan-Feb 2023
Todd Grove Park
June-July 2022 July 2022 July- Dec 2022 January 2023
Design Purchasing Production Delivery Construction
June 15, 2022
Award of
Contract
Spring 2023
Completion of
Playground
54 Cost Proposal
Todd Grove Park - Option #1
55 Cost Proposal
Todd Grove Park - Option #2
56 References
Pickleweed Park, San Rafael
Located near the Albert J. Boro Community Center, the park features sports fields, picnic area sand a large brightly colored playground. This park has 3 Miracle structures so everyone can find something to play on! The area has a large Kids Choice Mega Tower with 14’ decks with lean out enclosure and two large tube slides! The structure also has two additional fun slides for kids as well as a Jax climber and freestanding Jax climbers. The 2-5 kids structure has lower slides and climbers with a lovely shade sail over the top. The third structure is a 2-12 age which is a perfect in-between challenge for kids who are not yet ready to tackle the 14’ mega slides. The park also features swings and benches for parents to rest and keep an eye on their little ones.
Reference Contact Name: Theo Sanchez, Associate Civil Engineer, City of San Rafael Phone and Email: (415) 458-5326, [email protected]
57 References
Beamer Park, Woodland
This City of Woodland wanted to revamp this community park which sits in the heart of this charming small town. The park is surrounded by other amenities which are very well used by the community such as a tennis court and city pool. Updating this park was a welcome addition to this central gathering spot for the community. The look of the park is modern and fun with the stone grey colors mixed in with tan and brown, it looks different than any other park in the community. The park features lots of cool elements for kids to have fun with including a Gravity Cube and Wavy Wedge Wall Walker for climbing fun, Pirouette to hop and jump on and Concerto Vibes musical instrument so children can make their own music. There are two playstructures so children of all ages can play together. The toddler playstructure has lots of fun activities like a 360 degree Typhoon slide and tot rock climber. The older kids playstructure has multi-level decks, a 855 degree Typhoon slide, 2 other slides, 270 degree Try Rings, Fossil Bluff Climber and Dome Climber.
Reference Contact Name: Wes Schroeder, Park Superintendent, City of Woodland Phone and Email: (916) 996-8461, [email protected]
58 References
McConnell Park, Elk Grove
This 6.6-acre park was originally built in 1995 in the Hampton Village neighborhood of Elk Grove. The revitalization project was made possible by the residents of Hampton Village who voted to increase their annual assessments to fund both the construction and maintenance of the new facilities. The renovated park has something for everyone to enjoy! The playgrounds were renovated with separate areas for 2-5 and 5-12 year olds with customized Miracle play structures with bright, fun colors. The outdoor musical space is a place where people of all ages and abilities can collaborate in creative ways. The Concerto line of instruments from Miracle Recreation will nurture discovery and bring joy to children, families and communities. Adults and children can also come together and work out on the Miracle Recreation Fitness Equipment which is installed around the playground. Wabash benches are placed around the play structures, so parents can relax and have a great view of their children playing happily on the new playground. This playground needed an update and we think it came together perfectly!
Reference Contact Name: Sheri Noblett, Senior Landscape Architect, Consumnes CSD Phone and Email: (916) 405-5354, [email protected]
59 Subcontractors
980 Memorex Drive, Santa Clara, CA 95050
playgroundsunlimted.com
(408) 244-9848
[email protected]
Work Performing - Playground Installer
Playgrounds Unlimited has been “Building Play, The Right Way, Since 1996.” Playgrounds Unlimited has more than 25 years of industry experience. Our primary business focus is on playground construction, installation, and renovation, Poured-in-Place (PIP) rubber safety surfacing, synthetic turf, sun shelters, pre-fab buildings, shade canopies, and water play equipment. Playgrounds Unlimited’s extensive knowledge of playground requirements based on manufacturer recommendations and Consumer Product Safety Commission (CPSC) guidelines and American Society for Testing and Materials (ASTM) standards is why we are the industry leader in playground installation.
Playgrounds Unlimited holds an “A” General Engineering and C61-D34 California State Contractors License #756794.
Playgrounds Unlimited is a NPCAI Qualified Contractor (National Playground Contractors Association, Inc.).
Playgrounds Unlimited is an IPEMA member (International Play Equipment Manufacturers Association).
• Demolition and disposal of existing 2-5 and 5-12 playground structures, bollard on inside of gate and old ADA ramp
• Remove and redistribute EWF under new construction to the other parts of the playbox to fill box • Complete installation of new 2-5 and 5-12 playground equipment provided by Miracle Playsystems • Upgrade existing path and ADA ramp into playbox to meet current ADA requirements. Concrete path shall be the same width as existing path to end at outside (eastern) edge of the historic rock gate. The path should be at a level that allows the gate to swing closed and should be flush with existing asphalt.
• Install and spread new EWF under new playground structures Playgrounds Unlimited
60 Exceptions
We do not have any exceptions to this RFP for Todd Grove Park.
Don't forget to follow us on Social Media!
Shana Friesen, Client Services Manager
[email protected]
(510) 514-5212
miracleplaygroup.com
THANK YOU!
Attachment 2
IPEMA ASTM F1487-21 CERTIFICATE OF COMPLIANCE
ISSUE DATE: May 16, 2022
Requested By: John Ogden
Project: 877-15803 Todd Grove Park
In the interest of public playground safety, IPEMA provides a third-party certification service whereby TÜV SÜD America validates a manufacturer's certification of conformance to the ASTM F1487-21 (excluding sections 7.1.1, 10, 11.2, 11.3, 13.1.1, 13.1.2, 13.2, and
13.3) Standard Consumer Safety Performance Specification for Playground Equipment for Public Use.
The manufacturer listed below has received written validation from TÜV SÜD America that the product(s) listed conform with the requirements of ASTM F1487-21 (excluding sections 7.1.1, 10, 11.2, 11.3, 13.1.1, 13.1.2, 13.2, and 13.3).
This certificate is invalid if any component or part is replaced, unless purchased from the original manufacturer and assembled in accordance with the original equipment manufacturer’s instructions. Check with the manufacturer to determine the validity of the certification of the product(s) listed prior to using this certificate for proof of certification.
MODEL # COMMERCIAL NAME OF PRODUCT PRODUCT LINE MANUFACTURER 71132 Wiggle Wave Climber, (5¢-4²) Supermax Play & Park Structures 71382 Vertical Ladder (2¢-0² Rise) Supermax Play & Park Structures 71008 Triangle Transfer Point W/Handhold (4¢ Deck) Supermax Play & Park Structures 71000 Square Deck Supermax Play & Park Structures
60061 SMALL KICKPLATE (FOR DECKS SPACED 8² APART) Supermax Play & Park Structures 71879 SMALL ALPINE CLIMBER Supermax Play & Park Structures 71657 Single Velocity Slide 5’4² Supermax Play & Park Structures 71317 Single U-Handle W/Clamps Supermax Play & Park Structures 71458 Single Step Transfer Supermax Play & Park Structures 61117 Return Step Supermax Play & Park Structures
71020 Pipe Wall W/Playwheel Supermax Play & Park Structures 71906 PARAGON CLIMBER 56² Supermax Play & Park Structures 71842 ORIGAMI FIN CLIMBER Supermax Play & Park Structures 71114 Offset Entry Archway Supermax Play & Park Structures 71395 Mini Amaze Panel Supermax Play & Park Structures
71013 Metal Barrier Supermax Play & Park Structures
71340 Leg Lift Supermax Play & Park Structures
71530 Labyrinth Link W/Tree Supermax Play & Park Structures 71161 Horizontal Loop Ladder Att. 32² Supermax Play & Park Structures 71757 Gear Panel Supermax Play & Park Structures
7202 Echo Chamber Assembly Parkplay Play & Park Structures 71761 Double Pinnacle Link Supermax Play & Park Structures 71679 Double Curved Velocity Supermax Play & Park Structures 71473 Deck To Deck Stairs 2’8² Rise Supermax Play & Park Structures 71756 Bubble Panel Supermax Play & Park Structures
71403 ADA Spin & Win Panel Supermax Play & Park Structures 71878 6¢ LARGE ALPINE CLIMBER Supermax Play & Park Structures 71872 4 Deck Square Shade Supermax Play & Park Structures 71949 12FT TUBE TO OPEN SLIDE REVERSE Supermax Play & Park Structures 71946 12FT SPIRAL TUBE SLIDE Supermax Play & Park Structures 71941 12FT LEAN OUT PANEL Supermax Play & Park Structures
IPEMA ASTM F1487-21 CERTIFICATE OF COMPLIANCE
ISSUE DATE: May 16, 2022
Requested By: John Ogden
Project: 877-15803 Todd Grove Park
MODEL # COMMERCIAL NAME OF PRODUCT PRODUCT LINE MANUFACTURER 71938 10FT BARRIER Supermax Play & Park Structures
IPEMA CSA Z614:20 UPDATE NO. 1 CERTIFICATE OF COMPLIANCE ISSUE DATE: May 16, 2022
Requested By: John Ogden
Project: 877-15803 Todd Grove Park
In the interest of public playground safety, IPEMA provides a third-party certification service whereby TÜV SÜD America validates a manufacturer's certification of conformance to CSA Z614:20 Update No. 1 (excluding clauses 10 and 11) Children’s Playspaces and Equipment.
The manufacturer listed below has received written validation from TÜV SÜD America that the product(s) listed conform with the requirements of CSA Z614:20 Update No. 1 (excluding clauses 10 and 11).
This certificate is invalid if any component or part is replaced, unless purchased from the original manufacturer and assembled in accordance with the original equipment manufacturer’s instructions. Check with the manufacturer to determine the validity of the certification of the product(s) listed prior to using this certificate for proof of certification.
MODEL # COMMERCIAL NAME OF PRODUCT PRODUCT LINE MANUFACTURER 71132 Wiggle Wave Climber, (5¢-4²) Supermax Play & Park Structures 71382 Vertical Ladder (2¢-0² Rise) Supermax Play & Park Structures 71000 Square Deck Supermax Play & Park Structures
60061 SMALL KICKPLATE (FOR DECKS SPACED 8² APART) Supermax Play & Park Structures 71879 SMALL ALPINE CLIMBER Supermax Play & Park Structures 71657 Single Velocity Slide 5’4² Supermax Play & Park Structures 71317 Single U-Handle W/Clamps Supermax Play & Park Structures 61117 Return Step Supermax Play & Park Structures
71020 Pipe Wall W/Playwheel Supermax Play & Park Structures 71906 PARAGON CLIMBER 56² Supermax Play & Park Structures 71842 ORIGAMI FIN CLIMBER Supermax Play & Park Structures 71114 Offset Entry Archway Supermax Play & Park Structures 71395 Mini Amaze Panel Supermax Play & Park Structures
71013 Metal Barrier Supermax Play & Park Structures
71340 Leg Lift Supermax Play & Park Structures
71530 Labyrinth Link W/Tree Supermax Play & Park Structures 71161 Horizontal Loop Ladder Att. 32² Supermax Play & Park Structures 71757 Gear Panel Supermax Play & Park Structures
7202 Echo Chamber Assembly Parkplay Play & Park Structures 71761 Double Pinnacle Link Supermax Play & Park Structures 71473 Deck To Deck Stairs 2’8² Rise Supermax Play & Park Structures 71756 Bubble Panel Supermax Play & Park Structures
71878 6¢ LARGE ALPINE CLIMBER Supermax Play & Park Structures 71872 4 Deck Square Shade Supermax Play & Park Structures 71949 12FT TUBE TO OPEN SLIDE REVERSE Supermax Play & Park Structures 71946 12FT SPIRAL TUBE SLIDE Supermax Play & Park Structures 71941 12FT LEAN OUT PANEL Supermax Play & Park Structures 71938 10FT BARRIER Supermax Play & Park Structures
IPEMA CSA Z614:20 UPDATE NO. 1 CERTIFICAT DE CONFORMITÉ Date de Délivrance Initiale: mai 16, 2022
Demandé par: John Ogden
Nom du parc: 877-15803 Todd Grove Park
Dans l'intérêt de la sécurité au terrain de jeu, IPEMA offre une certification par une tierce partie et TÜV SÜD America valide une certification par le fabricant de la conformité à la norme CSA Z614:20 Update No. 1 (excluant les articles 10, 11) les enfants les espaces de jeu et du matériel.
Le fabricant ci-dessous a reçu la validation de la part de TÜV SÜD America que les produits énumérés ci-dessous sont conformes aux exigences de la norme CSA Z614:20 Update No. 1 (excluant les articles 10, 11).
Ce certificat n'est pas valide si un composant ou une pièce est remplacé, à moins que le composant soit acheté du fabricant d'origine et assemblé conformément aux instructions du fabricant de l'équipement. Vérifiez auprès du fabricant pour déterminer la validité de la certification du (des) produit(s) indiqué(s) avant d'utiliser ce certificat pour la preuve de la certification.
MODÈLE n
o NOM COMMERCIAL DU PRODUIT LIGNE DE PRODUIT MANUFACTURIER 71132 Wiggle Wave Climber, (5¢-4²) Supermax Play & Park Structures 71382 Vertical Ladder (2¢-0² Rise) Supermax Play & Park Structures 71000 Square Deck Supermax Play & Park Structures
60061 SMALL KICKPLATE (FOR DECKS SPACED 8² APART) Supermax Play & Park Structures 71879 SMALL ALPINE CLIMBER Supermax Play & Park Structures 71657 Single Velocity Slide 5’4² Supermax Play & Park Structures 71317 Single U-Handle W/Clamps Supermax Play & Park Structures 61117 Return Step Supermax Play & Park Structures
71020 Pipe Wall W/Playwheel Supermax Play & Park Structures 71906 PARAGON CLIMBER 56" Supermax Play & Park Structures 71842 ORIGAMI FIN CLIMBER Supermax Play & Park Structures 71114 Offset Entry Archway Supermax Play & Park Structures 71395 Mini Amaze Panel Supermax Play & Park Structures
71013 Metal Barrier Supermax Play & Park Structures
71340 Leg Lift Supermax Play & Park Structures
71530 Labyrinth Link W/Tree Supermax Play & Park Structures 71161 Horizontal Loop Ladder Att. 32² Supermax Play & Park Structures 71757 Gear Panel Supermax Play & Park Structures
7202 Echo Chamber Assembly Parkplay Play & Park Structures 71761 Double Pinnacle Link Supermax Play & Park Structures 71473 Deck To Deck Stairs 2’8² Rise Supermax Play & Park Structures 71756 Bubble Panel Supermax Play & Park Structures
71878 6' LARGE ALPINE CLIMER Supermax Play & Park Structures 71872 4 Deck Square Shade Supermax Play & Park Structures 71949 12FT TUBE TO OPEN SLIDE REVERSE Supermax Play & Park Structures 71946 12FT SPIRAL TUBE SLIDE Supermax Play & Park Structures 71941 12FT LEAN OUT PANEL Supermax Play & Park Structures 71938 10FT BARRIER Supermax Play & Park Structures
5/16/2022
Todd Grove Park
Drawing 877-151803
Park Play Specifications
General System Specifications:
Manufacturer shall offer the following warranties on the materials and components of its system:
- Lifetime limited warranty on support posts (uprights) - 15-Year limited warranty on punched steel decks, pipes, rails, loops and rungs - 15-Year limited warranty on rotationally molded polyethylene components - Lifetime limited warranty on all hardware
Manufacturer shall be ISO 9001/2000 certified
Manufacturer shall show IPEMA certification of compliance for each component that the product conforms with the requirements of ASTM F1487-01.
Other
Small Amaze Activity
Small Activity: The Triangle Housing and Caps shall be injection molded from color impregnated high density polyethylene. The Maze Bubble shall be injection molded from clear ABS plastic. The Echo Chamber, Answer Wheel, Knob and Maze shall be injection molded from color impregnated ABS plastic. The Flat Mirror shall be 1/8" thick Polycarbonate with a mirror finish applied to one side. The Stained Glass shall be 3/16" translucent Polycarbonate SuperMax Specifications
General System Specifications:
SuperMax features 5" O.D. uprights with a high-strength aluminum alloy clamp fastening system finished with a polyester powdercoat. All uprights shall receive factory installed aluminum post caps and will ship with labels for manufacturer identification.
All decks and components shall connect using the aluminum alloy clamping system. All climbing attachments shall include a 15" wide deck entry archway to control deck access to one child at a time and help prevent inadvertent falls.
Manufacturer shall offer the following warranties on the materials and components of its system:
- Lifetime limited warranty on support posts (uprights) - 15-Year limited warranty on punched steel decks, pipes, rails, loops and rungs - 15-Year limited warranty on rotationally molded polyethylene components - Lifetime limited warranty on all hardware
Manufacturer shall be ISO 9001/2000 certified
Manufacturer shall show IPEMA certification of compliance for each component that the product conforms with the requirements of ASTM F1487-01.
General Specifications of Materials
Uprights, Aluminum
The posts shall be 5"outside diameter tubing with an 1/8" minimum wall thickness. The material shall be extruded from 6005-T5 seamless aluminum alloy conforming to ASTM-B-221. Minimum yield strength shall be 35,000 psi and minimum tensile strength shall be 38,000 psi. All upright posts shall be coated with a custom formula TGIC polyester powder coating in conformance with the specifications outlined herein.
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
Hardware
All nuts, bolts, and washers, with exceptions noted, shall be 3/8" diameter 18-8 stainless steel in varying lengths, with a vandalresistant hex-pinned head configuration and factory-applied locking patch. When allowed a 72-hour cure time, the locking patch will prevent the bolt from loosening without at least 4 times the installation torque. Play & Park Structures will supply the special tool required to turn vandal-resistant hardware with each shipment. 1/2" diameter Ramp and Arch Bridge connecting hardware shall be Grade 5 zinc-plated, and 3/8" Clatter Bridge security bolts shall be Grade 8 hardened and zinc-plated.
Deck Components
Kickplates
Kickplate is cut from galvanneal sheet metal with (8) 7/16" x 1" slotted holes punched to coincide with deck flange holes. Corners are rounded, edges are ground smooth, and receives a baked-on polyester powder-coated finish after fabrication.
Deck Components
Return Step
Return Step
The Return Step shall be made from 12 gauge punched steel with a protective p&o finish in conformance with the specifications outlined herein. The Return Steps shall be a one-piece welded assembly finished with the matte PVC coating per the specifications herein. Support legs shall be fabricated from 1-5/16" O.D. x .083" (14 gauge) wall galvanized steel tubing. Support Legs shall be allwelded assemblies and shall be coated after fabrication with a custom formula of TGIC polyester powder in conformance with the specifications outlined herein.
General Specifications of Materials
Plastisol Coating
All metal deck platforms, steps, bridge planks, ramps, kickplates, and chains are plastisol-coated. Each part is chemically washed and completely submerged in a special heat-activated primer and allowed to dry. Parts are then pre-heated and immersed in liquid polyvinyl-chloride (plastisol). The PVC coating shall have a typical thickness of .080" to .120", and a hardness of Shore A 83 +/-5 normal durometer range. This material is classed as "Self Extinguishing", meets or exceeds automotive specifications NVSS302, and contains ultraviolet inhibitors to help prolong the life of the coating. Standard color is brown, with optional colors available. The following characteristics apply:
Tensile Strength - 2,800 psi
Elongation - 290 %
Tear Strength - 420 lbs/in
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
Plastisol Coating
All metal deck platforms, steps, bridge planks, ramps, kickplates, and chains are plastisol-coated. Each part is chemically washed and completely submerged in a special heat-activated primer and allowed to dry. Parts are then pre-heated and immersed in liquid polyvinyl-chloride (plastisol). The PVC coating shall have a typical thickness of .080" to .120", and a hardness of Shore A 83 +/-5 normal durometer range. This material is classed as "Self Extinguishing", meets or exceeds automotive specifications NVSS302, and contains ultraviolet inhibitors to help prolong the life of the coating. Standard color is brown, with optional colors available. The following characteristics apply:
Tensile Strength - 2,800 psi
Elongation - 290 %
Tear Strength - 420 lbs/in
Deck Components
Deck Platforms
Metal decks shall be a one-piece construction and shall be designed to maintain a full 48" on center post spacing. Metal decks shall be fabricated from 11 gauge hot rolled steel which shall be punched, formed, and reinforced with welded in place 2-1/2" x 11 ga. steel strips. Decks shall include a pattern of equally spaced slots on each side to provide a flush mounting of play events that attach to the deck, as well as the design of more than one adjacent deck at the same height. Each deck shall have welded at the corner underside a threaded 3/8" stud for attachment to the post's Deck Clamps. This fastening technique eliminates the need for hardware protruding through the deck surface, thereby eliminating the possibility of an entanglement hazard and presenting a clean and smooth deck
surface. Entire deck assembly, after fabrication, shall be dipped in a textured skid-resistant poly-vinyl-chloride (plastisol) coating to a minimum thickness of .080".
General Specifications of Materials
Plastisol Coating
All metal deck platforms, steps, bridge planks, ramps, kickplates, and chains are plastisol-coated. Each part is chemically washed and completely submerged in a special heat-activated primer and allowed to dry. Parts are then pre-heated and immersed in liquid polyvinyl-chloride (plastisol). The PVC coating shall have a typical thickness of .080" to .120", and a hardness of Shore A 83 +/-5 normal durometer range. This material is classed as "Self Extinguishing", meets or exceeds automotive specifications NVSS302, and contains ultraviolet inhibitors to help prolong the life of the coating. Standard color is brown, with optional colors available. The following characteristics apply:
Tensile Strength - 2,800 psi
Elongation - 290 %
Tear Strength - 420 lbs/in
Deck Components
Kickplates
Kickplate is cut from galvanneal sheet metal with (8) 7/16" x 1" slotted holes punched to coincide with deck flange holes. Corners are rounded, edges are ground smooth, and receives a baked-on polyester powder-coated finish after fabrication.
Triangle Transfer with Handhold
Triangle Transfer with Handhold
The Triangle Transfer shall be made from 12 gauge punched steel with a protective p&o finish in conformance with the specifications outlined herein. The Triangle Transfer shall be a one-piece welded assembly finished with the matte PVC coating per the specifications herein. Handhold shall be fabricated from 1 7/8” O.D. x .12” (11gauge) wall and 1-5/16" O.D. x .083" (14 gauge) wall galvanized steel tubing. Support legs shall be fabricated from 1-5/16" O.D. x .083" (14 gauge) wall galvanized steel tubing. Handhold and Support Legs shall be all-welded assemblies and shall be coated after fabrication with a custom formula of TGIC polyester powder in conformance with the specifications outlined herein.
General Specifications of Materials
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
Metal Components
Pipe Wall w/ Playwheel
Pipe Wall is an all stainless steel welded assembly using 1-5/16" x 14-gauge galvanize tubing. Eight vertical 1-5/16" O.D. tubes are welded to two 1- 5/16" O.D. horizontal tubes and the entire assembly is polyester powder-coat finished. Pipe Wall is designed to provide a 38" high barrier above the deck surface. The steering wheel(s) is molded of a durable proprietary plastic and shall withstand an impact of over 250 foot-pounds. A grease impregnated bronze bushing is pressed into the shaft to provide smooth turning. The steering wheel(s) mounting bracket is formed of 3/16" thick steel and has a powder coat finish. Primary hardware is stainless steel.
General Specifications of Materials
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
Metal Components
Sided Entrance Barrier
Pipe Wall is fabricated from 1-5/16" O.D. 14-gauge galvanized steel tubing steel welded to L-Fittings and 3/16" x 2" x 27" Arch Side Entrance Plate. The entire Pipe Wall is coated with a bake on polyester powder-coated finished.
General Specifications of Materials
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
Metal Components
Wiggle Wave
Wiggle Wave Climber is one-piece all welded using 1-7/8" O.D. 13-gauge galvanized steel tubing for the side rails and 1/4" thick yellow zinc-coated steel attachment plate. Rungs are made from 1-5/16" O.D. 14-gauge galvanized steel tubing. The Wiggle Wave climber receives a baked-on powder coat finish. Arch Barrier is fabricated from 1-5/16" O.D. x .083" (14 gauge) wall galvanized steel tubing with interior vertical members fabricated of 1-1/16" O.D. x .075" (15 gauge) wall galvanized steel tubing. The Arch Barrier is a welded assembly and receives a baked-on powder coat finish.
General Specifications of Materials
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
Metal Components
Straight Horizontal Loop Ladders
Horizontal Loop Ladder consists of 3-1/2" O.D. 13-gauge galvanized steel tubing for the center beam and 1-5/16" O.D. 14-gauge galvanized steel tubing for the loops. Rungs are 1" O.D. 14-gauge galvanized tubes with 1-5/16" O.D. with swaged ends welded to center beam. Vertical Ladder is made of 1-5/16" O.D. galvanized tube with 1" O.D. Galvanized tube rungs, and 3/16" thick steel tabs.
All metal parts shall be coated with a custom formula TGIC polyester powder.
General Specifications of Materials
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
Metal Components
U-Handles
U-handles are fabricated from 1-5/16" O.D. 14-gauge galvanized steel tubing formed into 'U' shape and receive a baked on polyester powder-coated finish.
General Specifications of Materials
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
Metal Components
Leg Lift
Leg Lift is formed from 4-1/2" x 2" x 3/16" steel welded to 1" O.D. 14-gauge galvanized tubing, polyester powder-coated after fabrication. Half Clamp is cast from a 356 high-strength aluminum alloy with a baked-on polyester powder-coated finish.
General Specifications of Materials
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
HDPE Components
HDPE Panels
Panels shall be precision cut from a single solid sheet of .750" thick UV-stabilized extruded high-density polyethylene with colors molded in. The material will have a density of 60 lbs/ft³ and a tensile strength of 4400 PSI (30 Mpa) as determined per procedure C of ASTM D1928. All edges shall have radiuses and all corners rounded for safe play.
Metal Components
Vertical Ladder (HDPE)
Flat Bracket is made from 11-gauge galvanized steel sheet. The bracket receives a baked-on polyester powder-coated finish. The Entrance Barrier Wall is fabricated from 1-5/16" O.D. 14-gauge galvanized steel tubing steel welded to yellow-zinc coated 'L'-Fittings and 2-7/8" x 38-1/8" 7-gauge galvanized plate. The Entrance Barrier Wall receives a baked-on polyester powder-coated finish. Step Panels are cut from a sheet of high-density .850" thick extruded solid polyethylene with color molded in and UV-stabilized.
General Specifications of Materials
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
Rotomolded Components
Mini Amaze Panel
Mini A-Maze: Panel shall be 3" thick color impregnated linear low density polyethylene and shall conform to the rotationally molded specifications outlined herein, with double wall construction molded to a minimum 3/16” wall thickness. All polyethylene shall be linear low-density material with UV-stabilized color and an anti-static compound additive. All rotationally molded products shall meet or exceed the following specifications: ASTM D-1248, type 2, class A and Federal specification LP-390C, type 1, class M, grade 2, category 3; Density (ASTM D- 1505); Brittleness Temperature (ASTM D-746); Tensile Values (ASTM D-638); Flexural Modulus (ASTM D-790);Heat Distortion (ASTM-648); Low Temperature Impact (ARM-STD). Panel shall attach to upright clamp using a one piece formed 3/16” stainless steel tab.
General Specifications of Materials
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
Rotationally Molded Plastics
All Rotationally Molded Products are manufactured from linear low-density polyethylene UV-stabilized color and an anti-static compound additive. The tensile strength of this material is to be 2500 PSI as defined by ASTM D638. The typical wall thickness will be .250" (¼"). All rotationally molded products shall meet or exceed the following specifications: ASTM D-1248, type 2, class A and Federal specification LP-390C, type 1, class M, grade 2, category 3; Density (ASTM D- 1505); Brittleness Temperature (ASTM DPage 227 of 559 746); Tensile Values (ASTM D-638); Flexural Modulus (ASTM D-790); Heat Distortion (ASTM-648); Low Temperature Impact (ARM-STD). All solid plastic panels are manufactured from high-density polyethylene. All solid plastic panels shall meet or exceed the following specifications: Density (ASTM D- 1505); Brittleness Temperature (ASTM D-746); Tensile Values (ASTM D-638); Flexural Modulus (ASTM D-790).
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
HDPE Components
HDPE Panels
Panels shall be precision cut from a single solid sheet of .750" thick UV-stabilized extruded high-density polyethylene with colors molded in. The material will have a density of 60 lbs/ft³ and a tensile strength of 4400 PSI (30 Mpa) as determined per procedure C of ASTM D1928. All edges shall have radiuses and all corners rounded for safe play.
Spin & Win Panel
Spin & Win Panel is cut from a sheet of high-density .750" & .350" thick extruded solid polyethylene with color molded in and UVstabilized. Block is made of high-impact medium-density rotationally molded and UV-stabilized polyethylene with a minimum of
0.1875" wall thickness, rounded corners and with text numbers molded in. Each Block measures 9-1/16" wide by 8-7/8" high and is supported by one 1/2" O.D. nominal (schedule 40) galvanized pipe.
General Specifications of Materials
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
Plastisol Coating
All metal deck platforms, steps, bridge planks, ramps, kickplates, and chains are plastisol-coated. Each part is chemically washed and completely submerged in a special heat-activated primer and allowed to dry. Parts are then pre-heated and immersed in liquid polyvinyl-chloride (plastisol). The PVC coating shall have a typical thickness of .080" to .120", and a hardness of Shore A 83 +/-5 normal durometer range. This material is classed as "Self Extinguishing", meets or exceeds automotive specifications NVSS302, and contains ultraviolet inhibitors to help prolong the life of the coating. Standard color is brown, with optional colors available. The following characteristics apply:
Tensile Strength - 2,800 psi
Elongation - 290 %
Tear Strength - 420 lbs/in
Deck Components
Single Step Transfer
Step is fabricated from pre-punched steel sheet 11-gauge. After fabrication, entire Step is Plastisol-coated with a thickness of 50 to 80 mils on top of wear surface. Average perforation size is 5/16" diameter after coating. U-Handle is formed from 1-5/16" O.D. 14-gauge galvanized steel tubing and polyester powder-coated. 24" Support Legs are 1-5/8" O.D. 14-gauge galvanized steel tubing with one end flattened and pre-punched for attachment.
General Specifications of Materials
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
Deck Components
Deck to Deck Stairs
Right and Left Barrier Assembly:
Shall be fabricated from 1.029" O.D. x .072" (15 gauge) wall galvanized steel rung, 1-5/16" O.D. x .083"(14 gauge) wall galvanized steel socket, 14 gauge galvanized steel pipe cap, and 11 gauge laser cut steel tab. Right and Left Barrier Assembly shall be an allwelded assembly and shall be coated after fabrication with a custom formula of TGIC polyester powder coating in conformance with specifications outlined herein.
Coated Stairs:
Shall be fabricated from 12 gauge (.109"thick) punched steel with a protective pickled and oiled finish. The Coated Stairs is chemically washed and completely submerged in a special heat-activated primer and allowed to dry. Then pre-heated and immersed in liquid poly-vinyl-chloride (plastisol). The PVC coating shall have a typical thickness of .080"to .120" and a hardness of Shore A 83 +/- 5 normal durometer range. This material is classed as "Self-extinguishing"meets or exceeds automotive specifications NVSS302, and contains ultraviolet inhibitors to help prolong the life of the coating. The following characteristics apply: Tensile Strength - 2,800 psi, Elongation - 290%, Tear Strength - 420 lbs. /in.
Pipe Adapters:
Shall be fabricated from die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.
General Specifications of Materials
Hardware
All nuts, bolts, and washers, with exceptions noted, shall be 3/8" diameter 18-8 stainless steel in varying lengths, with a vandalresistant hex-pinned head configuration and factory-applied locking patch. When allowed a 72-hour cure time, the locking patch will
prevent the bolt from loosening without at least 4 times the installation torque. Play & Park Structures will supply the special tool required to turn vandal-resistant hardware with each shipment. 1/2" diameter Ramp and Arch Bridge connecting hardware shall be Grade 5 zinc-plated, and 3/8" Clatter Bridge security bolts shall be Grade 8 hardened and zinc-plated.
Polyester Powder-Coating Process
Powder-coat shall be an electrostatically applied custom formula of TGIC polyester powder. All components will be free of sharp edges and excess weld spatter and shall be cleaned in a four stage solvent/zirconium based bath, as a rust inhibitor, and a sealer to prevent flash rusting before coating. The coating shall have a super tough finish with maximum exterior durability and will have superior adhesion characteristics. Typical characteristics are: 3.0 - 5.0 mil thickness and oven cured between 375 to 425 degrees Fahrenheit. Pencil Hardness H (ASTM D-3363), Impact (ASTM D-2794-69), Wedge Bend (ASTM D-522-68), Adhesion (Cross Hatch ASTM D-3359 & Knife Scratch ASTM D-2197), Environmental (Stain Resistance ASTM D-1308, Humidity ASTM D 2247 - 87, Salt Spray ASTM B-117 & Fadometer 300 hrs with no loss of gloss), Oven-bake Stability 200% at 350 degrees Fahrenheit for 10 minutes.
Cable Nets
Labyrinth with Tree
Support Pipe Tree 1 & 2:
Shall be 3.5" outside diameter, 13 gauge (.095") galvanized round tubing, manufactured to ASTM A-500 Section II tolerances from cold-formed steel conforming to ASTM A-569 Sheet Spec for Steel Coil. Minimum yield strength shall be 50,000 psi and minimum tensile strength shall be 55,000 psi. The exterior surface is hot dip galvanized, chromate conversion coated, and a clear high performance organic polymer is applied. The inside diameter has 81% minimum zinc rich primer capable of providing excellent rust protection and fabrication characteristics. All coatings are applied inside and out after welding for superior corrosion protection throughout. Exterior surface galvanizing zinc purity is 99% as per ASTM B-6 high grade and special high grade. Galvanizing coverage shall demonstrate the ability to exceed 1000 hours salt spray corrosion exposure in accordance with ASTM B-117. Internal surface zinc rich 81% minimum zinc dust content in organic resin, as per ASTM F-1234, Section 5.2.4, Type D. All upright posts shall have a finished grade line marking to indicate the correct playground safety surface level.
All upright posts shall be coated with a custom formula TGIC polyester powder coating in conformance with the specifications outlined herein.
Hardware:
All nuts, bolts, screws, inserts, and lock washers used in the assembly of all play equipment shall be stainless steel, yellow dichromate plated steel, blue-coat plated steel, mechanically galvanized or powder coated/yellow dichromate plated steel. All primary fasteners shall be 304 alloy stainless steel. Fasteners with yellow dichromate treatment have an electro-deposited, 99.9% pure zinc substrate applied from a specially formulated solution sealed with a yellow dichromate top coat designed to work in conjunction with the zinc plating. Yellow dichromate has a 320% longer life to white corrosion and 275% longer to red corrosion than does hot-dip galvanizing.
Stainless steel fasteners shall be button pin-in head, hex socket cap screws with a two-part epoxy locking patch added to the threads.
The two-part locking patch shall consist of one part resin and one part catalyst which are activated during installation. After curing, the material shall require a minimum of five times the installation torque to remove the fastener. Manufacturer shall provide special installation tools for pinned fasteners.
General Specifications of Materials
SuperMax Clamp
Clamp Ring and Adapters are die cast from an A380 high-strength aluminum alloy with a baked-on polyester powder-coat finish.