Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
18 Contractor. The City will consider as avoidable delays within the meaning of this contract (1) delays in the prosecution of parts of the work, which may in themselves be unavoidable, but do not necessarily prevent or delay the prosecution of other parts of the work nor the completion of the whole work within the time herein specified, (2) reasonable loss of time resulting from the necessity of submitting plans to the Engineer for approval and from the making of surveys, measurements, inspections, and testing and (3) such interruptions as may occur in the prosecution of the work on account of the reasonable interference of other contractors employed by the City which do not necessarily prevent the completion of the whole work within the time herein specified. 9-04. Unavoidable Delays. Unavoidable delays in the prosecution or completion of the work under this contract shall include all delays which may result, through cause beyond the control of the Contractor and which he or she could not have provided against by the exercise of care, prudence, foresight and diligence. Orders issued by the City changing the amount of work to be done, the quantity of material to be furnished or the manner in which the work is to be prosecuted and unforeseen delays in the completion of the work of other contractors under contract with the City will be considered unavoidable delays, so far as they necessarily interfere with the Contractor's completion of the whole of the work. Delays due to normally adverse weather conditions will not be regarded as unavoidable delays. However, truly abnormal amounts of rainfall, temperatures or other weather conditions for the location of the work and time of year may be considered as unavoidable delays if those conditions necessarily cause a delay in the completion of the work.
9-05. Notice of Delays. Whenever the Contractor foresees any delay in the prosecution of the work and, in any event, immediately upon the occurrence of any delay which the contractor regards as an unavoidable delay, he or she shall notify the Engineer in writing of the probability of the occurrence of such delay and its cause, in order that the Engineer may take immediate steps to prevent, if possible, the occurrence or continuance of the delay, or, if this cannot be done, may determine whether the delay is to be considered avoidable or unavoidable, how long it continues and to what extent the prosecution and completion of the work are to be delayed thereby. 9-06. Extension of Time. Should any delays occur which the Engineer may consider unavoidable, as herein defined, the Contractor shall, pursuant to his or her application, be allowed an extension of time proportional to said delay or delays, beyond the time herein set forth, in which to complete this contract; and liquidated damages for delay shall not be charged against the Contractor by the City during an extension of time granted because of unavoidable delay or delays.
Any claim by Contractor for a time extension based on unavoidable delays shall be based on written notice delivered to the Engineer within 15 days of the occurrence of the event giving rise to the claim. Failure to file said written notice within the time specified shall constitute a waiver of said claim. Notice of the full extent of the claim and all supporting data must be delivered to the Engineer within 45 days of the occurrence unless the Engineer specifies in writing a longer period. All claims for a time extension must be approved by the Engineer and incorporated into a written change order.
9-07. Unfavorable Weather and Other Conditions. During unfavorable weather and other conditions, the Contractor shall pursue only such portions of the work as shall not be damaged thereby. No portions of the work whose satisfactory quality or efficiency will be affected by any unfavorable conditions shall be constructed while these conditions remain, unless, by special means or precautions approved by the Engineer, the Contractor shall be able to overcome them.
The Contractor shall be granted a time extension of one day for each unfavorable weather day which prevents him or her from placing concrete forms or placing and finishing concrete or asphalt concrete. Such unfavorable weather day is defined as a rain day where precipitation prevents the contractor from performing the work more than four (4) continuous hours within the authorized work period or a temperature day where the ambient temperature is below that specified for the placement of materials associated with the controlling work item for more than four (4) continuous work hours of the authorized work period.
9-08. Saturday, Sunday, Holiday and Night Work. No work shall be done between the hours of 6 p.m. and 7 a.m., nor on Saturdays, Sundays or legal holidays except such work as is necessary for the proper care and protection of work already performed, or except in cases of absolute necessity and in any case only with the permission of the Engineer.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
19 It is understood, however, that night work may be established as a regular procedure by the Contractor if he or she first obtains the written permission of the Engineer and that such permission may be revoked at any time by the Engineer if the Contractor fails to maintain at night adequate force and equipment for reasonable prosecution and to justify inspection of the work.
9-09. Hours of Labor. Eight (8) hours of labor shall constitute a legal day's work and the Contractor or any subcontractor shall not require or permit more than eight hours of labor in a day from any person employed by him or her in the performance of the work under this contract, unless paying compensation for all hours worked in excess of eight (8) hours per day at not less than 1½ times the basic rate of pay. The Contractor shall forfeit to the City, as a penalty, the sum of twenty-five dollars ($25.00) for each workman employed in the execution of the contract by him or her or by any subcontractor, for each calendar day during which such laborer, workman, or mechanic is required or permitted to labor more than eight hours in violation of the provisions of Section 1810 to 1816, inclusive, (Article 3, Chapter 1, Part 7, Division 2) of the Labor Code of the State of California and any acts amendatory thereof.
SECTION 10. PAYMENT
10-01. Certification by Engineer. All payments under this contract shall be made upon the presentation of certificates in writing from the Engineer and shall show that the work covered by the payments has been done and the payments thereof are due in accordance with this contract. 10-02. Progress Estimates and Payment. The Engineer shall, within the first seven (7) days of each month, make an estimate of the value of the work performed in accordance with this contract during the previous calendar month.
The first estimate shall be of the value of the work satisfactorily completed in place and meeting the requirements of the contract. And every subsequent estimate, except the final estimate, shall be of the value of the work satisfactorily completed in place since the last preceding estimate was made; provided, however, that should the Contractor fail to adhere to the program of completion fixed in this contract, the Engineer shall deduct from the next and all subsequent estimates the full calculated accruing amount of the liquidated damages to the date of said estimate, until such time as the compliance with the program has been restored.
The estimate shall be signed by the Engineer and, after approval, the City shall pay or cause to be paid to the Contractor in the manner provided by law, an amount equal to 95 percent of the estimated value of the work satisfactorily performed and complete in place.
10-03. Substitution of Securities.
1. At such times that Pubic Contract Code Section 22300 is in effect Contractor may propose the substitution of securities of at least equal market value for any moneys to be withheld to ensure performance under the Contract.
Market value shall be determined as of the day prior to the date such substitution is to take place. Such substitution shall be made at the request and expense of the Contractor. The securities shall be one or more of the following types:
(a) Bonds or interest-bearing notes or obligations of the United States, or those for which the faith and credit of the United States are pledged for the payment of principal and interest. (b) Bonds or interest-bearing notes on obligations that are guaranteed as to principal and interest by a federal agency of the United States.
(c) Bonds of the State of California, or those for which the faith and credit of the State of California are pledged for the payment of principal and interest.
(d) Bonds or warrants, including, but not limited to, revenue warrants, of any county, city, metropolitan water district, California water district, California water storage district, irrigation district in the State of Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
20 California, municipal utility district, or school district of the State of California, which are rated by Moody's or Standard and Poor as A or better.
(e) Bonds, consolidated bonds, collateral trust debentures, consolidated debentures, or other obligations issued by federal land banks or federal intermediate credit banks established under the Federal Farm Loan Act, as amended; debentures and consolidated debentures issued by the Central Bank for Cooperatives and banks for cooperatives established under the Farm Credit Act of 1933, as amended; bonds, or debentures of the Federal Home Loan Bank Board established under the Federal Home Loan Bank Act; and stock, bonds, debentures and other obligations of the Federal National Mortgage Association established under the National Housing Act as amended and bonds of any Federal Home Loan Mortgage Corporation.
(f) Commercial paper of "prime" quality as defined by a nationally recognized organization which rates such securities. Eligible paper is further limited to issuing corporations: (1) organized and operating within the United States; (2) having total assets in excess of five hundred million dollars ($500,000,000); and (3) approved by the Pooled Money Investment Board of the State of California. Purchases of eligible commercial paper may not exceed 180 days' maturity, nor represent more than 10 percent of the outstanding paper of an issuing corporation.
(g) Bills of exchange or time drafts on and accepted by a commercial bank, otherwise known as bankers acceptances, which are eligible for purchase by the Federal Reserve System. (h) Certificates of deposits issued by a nationally or state-chartered bank or savings and loan association. (i) The portion of bank loans and obligations guaranteed by the United States Small Business Administration or the United States Farmers Home Administration. (j) Student loan notes insured under the Guaranteed Student Loan Program established pursuant to the Higher Education Act of 1965, as amended (20 U.S.C. 1001, et seq.) and eligible for resale to the Student Loan Marketing Association established pursuant to Section 133 of the Education Amendments of 1972, as amended (20 U.S.C. 1087-2).
(k) Obligations issued, assumed or guaranteed by International Bank for Reconstruction and Development, the Inter-American Development Bank, the Asian Development Bank, or the Government Development Bank of Puerto Rico.
(l) Bonds, debentures and notes issued by corporations organized and operating within the United States.
Such securities eligible for substitution shall be within the top three ratings of a nationally recognized rating service.
2. The securities shall be deposited with City or with any commercial bank as escrow agent, who shall arrange for transfer of such securities to the Contractor upon satisfactory completion of the contract. Any interest accrued or paid on such securities shall belong to the Contractor and shall be paid upon satisfactory completion of the contract.
The market value of the securities deposited shall at all times be maintained in an amount at least equal, in the sole judgment of City, to the moneys to be withheld pursuant to the Contract Documents to ensure performance of the Contract. In order to comply with this condition, Contractor shall deposit additional securities as necessary upon request by City or the escrow agent.
3. Upon acceptance of any Proposal that includes substituting securities for amounts withheld to ensure performance, a separate escrow agreement satisfactory in form and substance to City shall be prepared and executed by City, the Contractor and the escrow agent, which may be City. The escrow agreement shall specify, among other matters, value of securities to be deposited; procedures for valuing the securities and for adding or withdrawing securities to maintain the market value of the deposited securities at least equal to the amount of moneys which would otherwise be withheld; the terms and conditions of conversion to cash in case of the default Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
21 by the Contractor; and terms, conditions and procedure for termination of the escrow. City shall have no obligation to enter any such Agreement that does not provide the City with the unilateral right to convert securities to cash and to gain immediate possession of the cash.
10-04. Acceptance. The work must be accepted by vote of the City Council of the City of Ukiah when the whole shall have been completed satisfactorily. The Contractor shall notify the Engineer, in writing, of the completion of the work, whereupon the Engineer shall promptly, by personal inspection, satisfy himself as to the actual completion of the work in accordance with the terms of the contract and shall thereupon recommend acceptance by the City Council.
10-05. Final Estimate and Payment. The Engineer shall, as soon as practicable after the final acceptance of the work done under this contract, make a final estimate of the amount of work done thereunder and the value thereof.
Such final estimate shall be signed by the Engineer, and after approval, the City shall pay or cause to be paid to the Contractor, in the manner provided by law, the entire sum so found to be due hereunder, after deducting therefrom all previous payments and such other lawful amounts as the terms of this contract prescribe.
In no case will final payment be made in less than thirty-five (35) days after the filing of the notice of completion with the County Recorder.
10-06. Delay Payments. Should any payment due the Contractor or any estimate be delayed, through fault of the City beyond the time stipulated, such delay shall not constitute a breach of contract or be the basis for a claim for damages, but the City shall pay the Contractor interest on the amount of the payment at the rate of 6 percent per annum for the period of such delay. The terms for which interest will be paid shall be reckoned, in the case of any monthly or progress payment, from the twentieth day of the month next succeeding the month in which the work was performed to the date of payment of the estimate; and in the case of the final estimate, from the forty-fifth day after acceptance to the date of payment of the final estimate.
The date of payment of any estimate shall be considered the day on which the payment is offered or mailed as evidenced by the records of the Treasurer of the City. If interest shall become due on any delayed payment, the amount thereof, as determined by the City, shall be added to a succeeding payment. If the interest shall become due on the final payment, it shall be paid on a supplementary voucher to interest or any sum or sums which, by the terms of this contract, the City is authorized to reserve or retain. 10-07. Extra Work and Work Omitted. Whenever corrections, alterations, or modifications of the work under this contract ordered by the Engineer and approved by the City increase the amount of work to be done, such added work shall be known as "extra work"; and when such corrections, alterations, or modifications decrease the amount of work to be done, such subtracted work shall be known as "work omitted".
When the Contractor considers that any changes ordered involve extra work, he or she shall immediately notify the Engineer in writing and subsequently keep him or her informed as to when and where extra work is to be performed and shall make claim for compensation therefor each month not later than the first day of the month following that in which the work claimed to be extra work was performed and he or she shall submit a daily complete statement of materials and labor used and expenses incurred on account of extra work performed, showing allocation of all materials, labor and expenses.
All such claims shall state the date of the Engineer's written order and the date of approval by the City authorizing the work on account of which claim is made. Unless such notification is made in writing within the time specified and unless complete statements of materials used and expenses incurred on account of such extra work are furnished as above required, the Contractor shall not be entitled to payment on account of extra work and Contractor shall be deemed to have waived the right to make any future claims for compensation for such extra work.
When changes decrease the amount of work to be done, they shall not constitute a claim for damages on account of anticipated profits on the work that may be omitted.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
22 10-08. Compensation for Extra Work or Work Omitted. Whenever corrections, additions, or modifications in the work under this contract change the amount of work to be done or the amount of compensation due the Contractor, excepting increases or decreases in contract items having unit contract prices for each measurable quantity installed in place, and such changes have been ordered in writing by the Engineer and approved by the City prior to the Contractor performing the extra work, then a price may be agreed upon. Failing such an agreement in price, the Contractor shall be compensated for performing extra work pursuant to the provisions of Section 4-1.03 D, "Extra Work", and Section 9-1.03,"Force Account Payment" of the Standard Specifications.
This method of determining the price of work shall not apply to the performance of any work which is required or reasonably implied to be performed or furnished under this contract. 10-09. Compensation to the City for Extension of Time. In case the work called for under this contract is not completed within the time limit stipulated herein, the City shall have the right as provided hereinabove, to extend the time of completion thereof. If the time limit be so extended, the City shall have the right to charge to the Contractor and to deduct from the final payment for the work the actual cost to the City of engineering, inspection, superintendence and other overhead expenses which are directly chargeable to the contract and which accrue during the period of such extension, except that the cost of final unavoidable delays shall not be included in such charges.
10-10. Liquidated Damages for Delay. It is agreed by the parties to the contract that time is of the essence and that, in case all the work is not completed before or upon the expiration of the time limit as set forth, damage, other than those cost items identified in section 10-09, will be sustained by the City and that it is and will be impracticable to determine the actual amount of damage by reason of such delay; and it is therefore agreed that the Contractor will pay to the City the sum of five hundred dollars ($500.00) per day for each and every calendar day's delay beyond the time prescribed.
In compliance with the provisions of California Public Contract Code § 7102, the Contractor will be compensated for damages incurred due to delays in completing the work due solely to the fault of the City, where such delay is unreasonable under the circumstances and not contemplated by the parties. The Contractor and City agree that determining actual damages is impracticable and extremely difficult. As such, the Contractor shall be entitled to the appropriate time extension and to payment of liquidated damages in the sum of $250 per day of delay in excess of the time specified for the completion of the work. Such amount shall constitute the only payment allowed and shall necessarily include all overhead (direct or indirect), all profit, all administrative costs, all bond costs, all labor, materials, equipment and rental costs, and any other costs, expenses and fees incurred or sustained as a result of such delay. The Contractor expressly agrees to be limited solely to the liquidated damages for all such delays as defined in this subsection.
SECTION 11. MISCELLANEOUS
11-01. Notice. Whenever any provision of the contract documents requires the giving of written notice, it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. If mailed, the notice shall be deemed received on the date of delivery stated in the return receipt.
11-02. Computation of Time. When any period of time is referred to in the Contract Documents by days, it shall be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation.
11-03. Claims Procedure Required by Public Contract Code Section 9204 Contractor shall timely comply with all notices and requests for changes to the contract time or contract price, as a prerequisite to filing any claim governed by this Article. The failure to timely submit a notice of delay or notice of change, or to timely request a change to the contract time or contract price, or to timely provide any other notice or request required herein shall constitute a waiver of the right to further pursue the claim under the contract or at law.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
23 A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Article is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Article shall be construed to be consistent with said statutes.
B. Claims. For purposes of this Article, “Claim” means a separate demand by the Contractor, for (A) a time extension, (B) payment of money or damages arising from work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the District.
Claims governed by this Article may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order. Claims governed by this Article must be filed no later than the date of final payment. The claim shall be submitted in writing to the District and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Furthermore, the claim shall include the documents necessary to substantiate the claim. Nothing herein is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra work, disputed work, and/or changed conditions.
Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.
C. Supporting Documentation. The Contractor shall submit all claims in the following format:
Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made
List of documents relating to claim:
Specifications
Drawings
Clarifications (Requests for Information)
Schedules
Other
Chronology of events and correspondence
Analysis of claim merit
Analysis of claim cost
Time impact analysis in CPM format
If Contractor’s claim is based in whole or in part on an allegation of errors or omissions in the Drawings or Specifications for the project, Contractor shall provide a summary of the percentage of the claim subject to design errors or omissions and shall obtain a certificate of merit in support of the claim of design errors and omissions.
D. City’s Response. Upon receipt of a claim pursuant to this Article, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the City issues its written statement.
If the City needs approval from its governing body to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City’s governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three days following the next duly publicly noticed meeting of the City’s governing body after the 45-day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.
Within 30 days of receipt of a claim, the City may request in writing additional documentation supporting the claim or relating to defenses or claims the District may have against the Contractor. If additional information is Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
24 thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor. The City’s written response to the claim, as further documented, shall be submitted to the Contractor within 30 days (if the claim is less than $15,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.
E. Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 days of receipt of the City’s response or within 15 days of the City’s failure to respond within the time prescribed, respectively, and demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute.
F. Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the City issues its written statement. Any disputed portion of the claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The City and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time.
If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.
For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Public Contract Code Section 20104.4 to mediate after litigation has been commenced.
The mediation shall be held no earlier than the date the Contractor completes the work or the date that the Contractor last performs work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed.
G. Procedures After Mediation. If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference.
H. Civil Actions. The following procedures are established for all civil actions filed to resolve claims of $375,000 or less:
Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of this Contract. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
25 If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.
I. Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Sections 900, et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, construction claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if the prerequisite contractual requirements are not satisfied, no action against the City may be filed. A Government Code claim must be filed no earlier than the date the work is completed or the date the Contractor last performs work on the project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted.
J. Non-Waiver. The City’s failure to respond to a claim from the Contractor within the time periods described in this Article or to otherwise meet the time requirements of this Article shall result in the claim being deemed rejected in its entirety.
11-04. Litigation and Forum Selection. Contractor and City stipulate and agree that any litigation relating to the enforcement or interpretation of this contract, arising out of Contractor's performance or relating in any way to the work shall be brought in Mendocino County and that venue will lie in Mendocino County.
Except as otherwise expressly provided by law, the parties waive any objections they might otherwise have to the propriety of jurisdiction or venue in the state courts in Mendocino County and agree that California law shall govern any such litigation.
The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto and, in particular but without limitation, the warranties, guaranties and obligations imposed upon the Contractor and all of the rights and remedies available to the City thereunder, shall be in addition to and shall not be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by law or contract, by special warranty or guaranty, or by other provisions of the contract documents and the provisions of this paragraph shall be as effective as if repeated specifically in the contract documents in connection with each particular duty, obligation, right and remedy to which they apply. All warranties and guaranties made in the contract document shall survive final payment and termination or completion of this contract. The City disclaims an express or implied warranty that the plans and specifications identify all site conditions that could affect the time or cost to complete the Work. 11-05. Waiver. The Contractor shall strictly comply with all notices and other contract requirements. Waiver by the City of any failure of the Contractor to comply with any term of the contract, including the notice provisions, shall not be deemed a waiver of a subsequent breach.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
26 TECHNICAL SPECIFICATIONS
SECTION 12. GENERAL INFORMATION
12-01. Location and Scope of Work. All of the work to be performed is within the City of Ukiah and consists of the deconstruction of the environmental remediation system and site restoration associated with the Underground Storage Tank (UST) remediation project at the Ukiah Corporate Yard, and the abandonment of twenty-three (23) monitoring wells and twenty-eight (28) remediation wells. Work is to include removal of all remediation apparatus and site restoration. General locations of the work are shown in the attached Appendix “A”. A map will be provided to the successful bidder showing the exact locations of the work to be done. All work will be done under the direction of the City of Ukiah Public Works Department.
The Contractor should familiarize himself with the local conditions of the project sites. Failure to do so will in no way relieve him of the responsibility for performing any of the work or operations required as a part of this contract.
Further information regarding the work or these specifications can be obtained from Myles Fisette at (707) 463- 6225.
12-02. Arrangement of Technical Specifications. The Technical Specifications are arranged in sections covering the various phases of work as follows:
Section No. Title
12 General Information
13 Construction Details
14 Exclusions from General Conditions
15 Amendments to General Conditions
12-03. Arrangement of Plans. General locations and quantities of the work are shown in Appendix "A". A map will be provided to the successful bidder showing the exact locations of the work to be done. 12-04. Business Licenses. The Contractor and any subcontractors shall each secure and maintain a valid City of Ukiah Business License prior to the start of any portion of the work. 12-05. Permits. The Contractor shall provide, procure, and pay for all permits required to complete this work. The City’s representative will be available to assist with the well abandonment permitting for the pressure grout variances.
12-06. Standard Specifications and Standard Plans. The Standard Specifications and Standard Plans of the California State Department of Transportation, 2023, are hereby made a part of these Special Provisions and are hereinafter referred to as "California Standard Specifications" and "California Standard Plans." Whenever in the California Standard Specifications and the California Standard Plans the following terms are used, they shall be understood to mean and refer to the following:
Department of Transportation - The City Council.
Director of Public Works - The City of Ukiah Director of Public Works.
Engineer - The Engineer, designated by the City Council, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them.
Laboratory - The designated laboratory authorized by the City of Ukiah to test materials and work involved in the contract.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
27 State - The City of Ukiah
Other terms appearing in the California Standard Specifications and the California Standard Plans shall have the intent and meaning specified in Section I, Definition of Terms of the California Standard Specifications.
In case of discrepancy between the contract documents, the order of precedence from the highest to lowest is as follows:
1. (City) Special Provisions
2. (City) Project Plans
3. City Standard Plans and Details
4. California Standard Plans
5. California Standard Specifications
12-07. Temporary Facilities. All temporary facilities are the responsibility of the Contractor. The removal of said facilities shall be the responsibility of the Contractor. The Contractor shall be responsible for any and all damages to existing facilities which are a result of the work.
12-08. Public Convenience and Safety. The Contractor shall conduct operations so as to cause the least possible obstruction and inconvenience to public traffic. The Contractor shall, at his or her expense, furnish such flag persons and furnish, erect, construct and maintain such fences, barriers, lights, signs, detours, pedestrian walkways, driveway ramps and bridging as may be necessary to give adequate warning to the public that work is in progress and that dangerous conditions exist, to provide access to abutting properties and to permit t he flow of pedestrian and vehicular traffic to safely and expeditiously pass the work. 12-09. Maintaining Traffic. Attention is directed to Section 7-1.03, “Public Convenience,” Section 7-1.04, “Public Safety,” and Section 12-4, “Maintaining Traffic,” including 12-4.02C(2), “Lane Closure System,” and 12-4.02C(9), “Flagging,” of the Standard Specifications.
Streets shall be open to through vehicular traffic during non-working hours. All public traffic shall be permitted to pass through the work with as little inconvenience and delay as possible.
The full cost of maintaining traffic, including flagging, shall be considered as included in the various items of work, and no additional compensation will be made.”
12.10. Stream Pollution. The Contractor shall exercise every reasonable precaution to prevent muddying or silting of live streams, and the Contractor's attention is called to the fact that the terms of this contract do not relieve him or her of responsibility for compliance with Sections 5650 and 12015 of the Fish and Game Code or other applicable statutes relating to pollution prevention or abatement. 12-11. Warranties. Unless otherwise indicated, the Contractor shall warrant all materials provided and work performed under this contract for a period of one year from the date of final acceptance. He shall replace promptly and at his own expense any materials and/or workmanship which fail during this warranty period. 12-12. Utilities. No sewer or electrical services will be provided by the owner. Water will be available at the City of Ukiah Corporation Yard location. It is the Contractor's sole responsibility to arrange such services as necessary. 12-13. Preconstruction Conference. A preconstruction conference will be held before any work will be allowed to commence. This meeting will cover inspection, schedule for work, and among other items, the responsibilities and procedures of each of the interested parties to assure that the project will be completed in accordance with the contract documents.
12-14. Safety Requirements. The Contractor shall comply with all pertinent provisions of the Department of Labor "Safety and Health Regulations for Construction (29 FCS Part 1518, 36 CFR 7340)", with additions or modifications thereto, in effect during construction of this project.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
28 SECTION 13 - CONSTRUCTION DETAILS
13-01. Scope. This document specifies the deconstruction and removal of a soil and groundwater remediation system, site restoration activities, and the abandonment of (23) monitoring wells and (28) remediation wells, as shown on the drawing (Appendix A), and in accordance with these Specifications.
The work to be performed under this contract includes the furnishing of all labor, material, transportation, tools, supplies, plant equipment, and appurtenances necessary for the complete and satisfactory remediation system decommissioning, site restoration, and the abandonment of environmental monitoring and remediation wells, as herein specified. Please note that “remediation wells” is used herein in reference to the (12) 4-inch diameter casing dual phase extraction wells and the (16) 1.5-inch diameter casing ozone injection wells.
Through the completion of the proposed activities, the Contractor must restrict his operations to the daylight hours.
The Contractor will not be entitled to any additional compensation for any overtime work necessary to comply with these requirements.
The City of Ukiah (City) or the City’s authorized representative will oversee the work and confirm the successful completion of each item included in this scope of work.
13-02. Personnel and Equipment. All equipment to be used for the performance of this Contract shall comply with all State and local safety regulations and shall be subject to the inspection and approval of the City or its representative. The environmental wells shall be abandoned in accordance with Contract Documents Well Abandonment Work Plan dated August 11, 2016, and Well Abandonment Work Plan Addendum dated August 1, 2024. The environmental wells shall be abandoned using hollow-stem auger (HSA) over-drilling methods, unless as otherwise specified, and as further defined in these technical provisions. Drilling equipment shall be of good condition and be of sufficient equipment capacity to perform the work required by these Specifications. The Contractor shall furnish documentation regarding capacity of various components of the drilling equipment. Drilling equipment shall have the ability to over-drill the well casings and associated well materials (i.e., sand, grout, concrete and bentonite). Delays during the drilling operation caused by the inadequacy of the drilling equipment shall be the responsibility of the Contractor and replacement of such inadequate equipment will be required by the City.
The Contractor shall conform to all of the following minimum requirements:
1. Current possession of a valid California Class A Contractor's License. In addition, a current, valid C-57 Well Drilling Contractor license shall be held either by the Contractor or by a qualified subcontractor identified in the bid. The C-57 Well Drilling Contractor shall also possess a valid Hazardous Waste Operations and Emergency Response Standard (Hazwoper) certification in accordance with Occupational Safety and Health Administration (OSHA) 29 CFR,
2. 5-years’ experience in site restoration work,
3. 5-years’ experience in abandonment of environmental wells (either by the Contractor or qualified subcontractor identified in the bid),
4. History of work performed to the satisfaction of municipal agencies including any work performed for the City,
5. Satisfactory work performance record with the State Department of Consumer Affair's Contractor's Licensing Bureau.
Prior to award of Contract, the Bidder shall, if requested, submit a listing of work performed for municipal agencies for the past 2-year period including name of agency, agency project manager, agency project manager's telephone number, and name of project. Additionally, the Contractor or qualified subcontractor identified in the bid, shall, if requested, submit a listing of all well abandonment drilling work performed for municipal agencies for the past 2- year period including name of agency, agency project manager, agency project manager's telephone number, and name of project. The Contractor shall employ only competent workers for the execution of this work. The Contractor shall designate one person, who shall have full decision-making authority, to be his representative on the jobsite on a daily basis. This person shall serve as Superintendent and his or her phone number shall be given to the City for emergency notification. Additionally, all drilling work shall be performed under the direct supervision Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
29 of an experienced well driller satisfactory to the City. For all work to be conducted on private property not owned by the City, the Contractor shall provide a minimum of 48-hour notification to the private property owner(s) prior to starting work.
13-03. Permits, Certificates, Laws, and Ordinances. The Contractor shall procure, at his own expense, all permits, certificates, and licenses required of him by law for the execution of this work. The Contractor’s attention is directed to the requirement to obtain drilling permits from the County of Mendocino Department of Environmental Health. The City’s representative will be available to assist with the well abandonment permitting for the pressure grout variances. He or she shall comply with all Federal, State, and local laws and ordinances or rules and regulations relating to the performance of the work and shall file all reports as required by the State and local agencies in connection with the well drilling. Copies of all reports shall be sent to the City. 13-04. EQUIPMENT COMPOUND DEMOLITION, DECONSTRUCTION, AND RESTORATION 13-04.1. Description: Equipment compound demolition, deconstruction, and restoration shall include any necessary work to remove, haul, and dispose of: all remediation system equipment and appurtenances, equipment compound canopy, equipment compound fencing and gates, concrete curb around perimeter of equipment compound, and concrete slab at equipment compound. Equipment compound demolition, deconstruction, and restoration shall also include any necessary work to repave footprint of equipment compound. 13-04.2 Remediation System Disassembly, Removal and Disposal: Disassemble, remove, haul, and dispose of all remediation system equipment. With the exception of three granular activated carbon water treatment vessels and the 500-gallon polyethylene storage tank, which will be disposed of by the City or the City’s representative, all remediation system equipment shall become property of the contractor and shall be disposed of as described in Section 13-10 and in accordance with all applicable State and Federal regulations. Remediation system components which shall become property of the Contractor include, but are not limited to, Dekker® VMAX 25-horsepower liquid ring pump (LRP), ozone sparge system (manufactured by Piper Environmental Group), thermal oxidizer, control panel, 3-phase 5 horsepower oil-less air compressor, particulate filter assembly, water transfer pumps, telemetry system, 120-gallon liquid/vapor separator tank, propane tank, and miscellaneous gauges, alarms and valves. The remediation system operated for approximately 5,000 hours and no assessment of the working condition of any remediation system components is implied nor will be provided. It is the sole responsibility of the Contractor to determine any potential value of remediation system components which shall become property of the Contractor.
All electrical will be disconnected and removed from the remediation system to service panel. Remediation system conveyance piping shall be cut and capped at the compound boundary. The compound canopy, fencing, and gates shall be removed and disposed.
13-04.3 Sawcut Existing Paving – Equipment Compound Perimeter: Sawcut pavement surrounding equipment compound to provide a uniform, straight edge. 13-04.4 Remove, Haul, and Dispose of 6” Concrete Curb around Equipment Compound: Concrete curb shall be removed within the designated limits and as specified hereinafter. All asphalt, concrete, and other curb materials removed shall become property of the Contractor and shall be legally disposed of off the site. 13-04.5 Remove, Haul, and Dispose of Concrete Slab (6” Thickness) at Equipment Compound (Includes Removal and Backfill of Grated Sump with CDF): Concrete slab shall be removed within the designated limits and as specified hereinafter. Concrete slab removal shall also include removal, disposal, and backfilling of grated sump. All asphalt, concrete, and slab materials removed shall become property of the Contractor and shall be legally disposed of off the site.
13-04.6 Asphalt Concrete Repaving – Equipment Compound Footprint: The area of the equipment compound shall be resurfaced with asphalt concrete to the dimensions indicated on the Plans. Asphalt concrete for pavement replacement shall be a minimum of 4-inches thick and conform to the requirements for Type A, 1/2 inch maximum, medium grading. Asphalt binder shall be steam-refined paving asphalt Grade PG 64-16 conforming to the Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
30 provisions of Section 92 of the Standard Specifications. Aggregate shall meet the full requirements of Section 39-
2.02 of the Standard Specifications for Type A (½-inch maximum medium grading). The amount of asphalt binder to be mixed with aggregate shall be such that the air void content of the resulting asphalt concrete shall be not less than 3% nor more than 5%.
The asphalt concrete shall be compacted in accordance with Section 39-5.02 of the Standard Specifications. The temperature of the asphalt concrete when placed and ready for compaction shall be done in accordance with Section 39-2.02C of the Standard Specifications. The atmospheric temperature should be at least 55-degrees Fahrenheit to place asphalt concrete, unless otherwise approved by the engineer. Placement of asphalt concrete materials should not commence during fog, rain, or other unsuitable conditions as determined by the Engineer.
Immediately after placement, protect pavement from mechanical injury for 3 days or until surface temperature is less than 140 degrees F (60 degrees C).
13-04.7 Measurement and Payment:
Measurement and Payment – Remediation System Equipment Disassembly, Removal, and Disposal:
Disassembly, removal and disposal of remediation system equipment will be measured and paid for at a lump sum price, which price shall include full compensation for furnishing all labor, materials, tools, equipment, and other incidental items necessary for doing all the work involved.
Measurement – Sawcut Existing Paving – Equipment Perimeter: Saw cutting will be measured by the linear foot performed as measured along the surface.
Payment – Sawcut Existing Paving – Equipment Perimeter: Saw cutting will be paid for at the contract unit price per linear foot performed, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as shown on the Plans or as directed by the Engineer.
Measurement - Remove, Haul, and Dispose of 6” Concrete Curb around Equipment Compound: Quantity for removal of concrete curb will be measured by the linear foot performed as measured along the surface.
Payment – Remove, Haul, and Dispose of 6” Concrete Curb around Equipment Compound: Removal of concrete curb will be paid for at the contract unit price per linear foot performed, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as shown on the Plans or as directed by the Engineer.
Measurement - Remove, Haul, and Dispose of Concrete Slab (6” Thickness) at Equipment Compound (Includes Removal and Backfill of Grated Sump with CDF): Quantity for concrete slab removal and disposal will be measured by the square foot performed as measured along the surface.
Payment – Remove, Haul, and Dispose of Concrete Slab (6” Thickness) at Equipment Compound (Includes Removal and Backfill of Grated Sump with CDF): Removal and disposal of concrete paving and slabs will be paid for at the contract unit price per square foot performed, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as shown on the Plans or as directed by the Engineer
Measurement – Asphalt Concrete Repaving – Equipment Compound Footprint: Quantity for repaving will be determined from the actual square footage of asphalt concrete repaved.
Payment – Asphalt Concrete Repaving – Equipment Compound Footprint: Repaving will be paid for at the contract unit price per square foot performed, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as shown on the Plans or as directed by the Engineer.
13-05. ABANDON FORCE MAIN DISCHARGE CONNECTION
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
31 13-05.1 Description: The work encompassed by this Section shall consist of the abandonment of the force main discharge sewer connection.
13-05.2 Abandon Force Main Discharge Connection: The force main sewer connection is co-located with DPE8, beneath the concrete collar. The force main abandonment and remediation well abandonment of DPE-8 will need to be sequenced appropriately to avoid duplication of work. Please see below in Section 13-08 for a detailing of the remediation well box removal and restoration scope. After removal of the well box concrete collar, remove sewer cleanout box. Excavate and locate the 4” WYE fitting, connecting the cleanout and force main to the sanitary sewer lateral. Cut and cap on force main, as shown on the Plans. Backfill and finish in coordination with the DPE-8 abandonment and restoration schedule, as described in section 13-08. 13-05.3 Measurement and Payment:
Measurement and Payment – Abandon Force Main Discharge Connection: Sewer connection abandonment will be measured and paid for at a lump sum price, which price shall include full compensation for furnishing all labor, materials, tools, equipment, and other incidental items necessary for completing this item as shown on the Plans or as directed by the Engineer
13-06. STEEL BOLLARD REMOVAL
13-06.1 Description: The work encompassed by this Section shall consist of the removal and disposal of seven (7) steel bollards surrounding existing propane tank.
13-06.2 Remove, Haul, and Dispose of Removable Steel Bollards. Backfill with CDF to 6" Minus and Repave to Match Existing Conditions: Remove and dispose of removable 4-inch galvanized steel pipes, 5-inch galvanized steel pipe sleeves, and concrete footings. Backfill steel bollard locations with controlled density fill to 6- inches below grade. Repave to match existing conditions. 13-06.3 Measurement and Payment:
Measurement – Remove, Haul, and Dispose of Removable Steel Bollards. Backfill with CDF to 6" Minus and Repave to Match Existing Conditions: Quantity for the removal and disposal of steel bollard removal will be measured by each steel bollard.
Payment – Remove, Haul, and Dispose of Removable Steel Bollards. Backfill with CDF to 6" Minus and Repave to Match Existing Conditions: Steel bollard removal will be paid for at the contract unit price per each item, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary, and doing all the work involved in the steel bollard removal including removal and disposal of the galvanized pipe and sleeve, removal and disposal of the concrete footing, backfill of steel bollard location, repaving of steel bollard location to match existing conditions, and no additional allowance will be made therefore. 13-07. MONITORING WELL BOX REMOVAL AND RESTORATION
13-07.1 Description: Monitoring well boxes are to be removed at each monitoring well location, which shall become property of the Contractor and disposed of as described in Subsection 13-10. All monitoring well locations shall be restored in a manner which matches existing conditions. Monitoring well box removal and restoration activities shall be conducted in coordination with the well abandonment activities described below in Section 13-
09..
13-07.2 Monitoring Well Box Removal and Restoration: Remove and dispose of monitoring well boxes. For monitoring wells located within areas of asphaltic paving, well box removal shall be performed in a manner which allows for a clean asphalt edge which shall be sealed with emulsion prior to paving with a hot-applied asphalt patch. The surface finish in all areas should match existing conditions. 13-07.3 Measurement and Payment:
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
32 Measurement – Monitoring Well Box Removal and Restoration: Quantity for site restoration at former monitoring well locations will be determined based on each monitoring well box removed.
Payment – Monitoring Well Box Removal and Restoration: Site restoration at former monitoring well locations will be paid for at the contract unit price per each monitoring well location restored, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as shown on the Plans or as directed by the Engineer.
13-08. REMEDIATION WELL BOX AND JUNCTION BOX REMOVAL AND RESTORATION 13-08.1 Description: The work encompassed by this Section shall consist of removing all remediation well boxes and junction boxes associated with the remediation system, removing all hose and tubing from conduit (from equipment compound to well or junction box location), capping conduit, saw cutting existing paving around each location, CDF backfill of each location (or Class II Aggregate base at specified locations), and repaving.
Remediation wells are contained within 24-inch square steel well boxes (4-inch polyvinyl chloride diameter casing dual phase extraction wells) and 18-inch circular steel well boxes (1.5-inch polyvinyl chloride diameter casing ozone sparge wells). The junction boxes are within 24-inch square steel well boxes and contain polyvinyl chloride conduit which encloses conveyance piping and tubing associated with the remediation system. Remediation well boxes and junction boxes removal and restoration activities shall be conducted in coordination with well abandonment activities as described below in Section 13-09. 13-08.2 Sawcut Existing Asphalt Paving and/or Concrete at Remediation Well Box and Junction Box:
Sawcut pavement around each remediation well box and junction box location to provide straight, uniform edge for repaving.
13-08.3 Remove, Haul, and Dispose of Remediation Well Box and Junction Box, Remove Concrete Collar, and Cut & Cap Conduit: Steel well boxes and junction boxes and associated concrete collars shall be removed at all remediation well locations and legally disposed of by the Contractor. Remove and dispose of all hose and tubing within conduit from well box / junction box locations to equipment compound. Cap all conduits. All concrete, asphalt, hose, and tubing removed shall become property of the contractor and legally disposed of as described in Section 13-10.
13-08.4 Backfill Remediation Well Boxes and Junction Boxes With CDF to 4" Minus: For remediation wells and junction boxes located within areas of asphaltic paving, the former well box locations shall be backfilled with controlled density fill (CDF) to four inches below finished grade or to an elevation coincident with the bottom surface of the surrounding pavement.
13-08.5 Replace Asphalt Concrete at Remediation Well Box and Junction Box Locations: For well box and junction box located within paved areas, repave with asphalt concrete. Asphalt concrete for pavement replacement shall be a minimum of 4-inches thick and conform to the requirements for Type A, 1/2 inch maximum, medium grading. Asphalt binder shall be steam-refined paving asphalt Grade PG 64-16 conforming to the provisions of Section 92 of the Standard Specifications. Aggregate shall meet the full requirements of Section 39-
2.02 of the Standard Specifications for Type A (½-inch maximum medium grading). The amount of asphalt binder to be mixed with aggregate shall be such that the air void content of the resulting asphalt concrete shall be not less than 3% nor more than 5%.
The asphalt concrete shall be compacted in accordance with Section 39-5.02 of the Standard Specifications. The temperature of the asphalt concrete when placed and ready for compaction shall be done in accordance with Section 39-2.02C of the Standard Specifications. The atmospheric temperature should be at least 55-degrees Fahrenheit to place asphalt concrete, unless otherwise approved by the engineer. Placement of asphalt concrete materials should not commence during fog, rain, or other unsuitable conditions as determined by the Engineer.
Immediately after placement, protect pavement from mechanical injury for 3 days or until surface temperature is less than 140 degrees F (60 degrees C).
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
33 13-08.6 Backfill Remediation Well Boxes with Class II Aggregate Base to Final Grade: For remediation wells located within unpaved areas, the former well box locations shall be backfilled with Class II aggregate base. All remediation well locations shall be restored to match existing conditions. 13-08.7 Measurement and Payment:
Measurement -- Sawcut Existing Asphalt Paving and/or Concrete at Remediation Well Boxes and Junction Boxes:
Saw cutting for box removal will be measured by the linear foot performed as measured along the surface.
Payment – Sawcut Existing Asphalt Paving and/or Concrete at Remediation Well Boxes and Junction Boxes: Saw cutting for removal of box will be paid for at the contract unit price per linear foot performed, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as shown on the Plans or as directed by the Engineer.
Measurement – Remove, Haul, and Dispose of Remediation Well Box/ Junction Box, Remove Concrete Collar, and Cut & Cap Conduit: Quantity for the removal and disposal of box will be measured by each box removed and disposed.
Payment – Remove, Haul, and Dispose of Remediation Well and Junction Box, Remove Concrete Collar, and Cut & Cap Conduit: Box removal and disposal will be paid for at the contract unit price per each box removed and disposed of, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as shown on the Plans or as directed by the Engineer.
Measurement – Backfill Remediation Well and Junction Boxes with CDF to 4" Minus: Quantity for the backfilling of each box location with CDF will be measured by the cubic yard.
Payment – Backfill Remediation Well and Junction Boxes with CDF to 4" Minus: Backfilling will be paid for at the contract unit price per cubic yard, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as shown on the Plans or as directed by the Engineer.
Measurement – Replace Asphalt Concrete at Remediation Well and Junction Box Locations: Quantity for the repaving of each box location with asphalt concrete will be measured by the square foot.
Payment – Replace Asphalt Concrete at Remediation Well and Junction Box Locations: Repaving will be paid for at the contract unit price per square foot, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary, and doing all the work involved in the repaving.
Measurement – Backfill Remediation Well Boxes with Class II Aggregate Base to Final Grade: Quantity for the backfilling of each well box location with Class II Aggregate Base will be measured by the cubic yard.
Payment – Backfill Remediation Well Boxes with Class II Aggregate Base to Final Grade: Backfilling will be paid for at the contract unit price per cubic yard, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as shown on the Plans or as directed by the Engineer.
13-09. WELL ABANDONMENT (C 57 License Required)
13-09.1. Monitoring Wells: The Contractor shall properly abandon the following twenty-three (23) monitoring wells: MW-2, MW-4, MW-5, MW-6, MW-7, MW-8, MW-9, MW-10, MW-11, MW-12B, MW-13B, MW-14B, MW-15, MW-16, MW-17, MW-18B, MW-19, MW-20, MW-21B, MW-22, MW-23B, MW-24, and EW-1. As specified in the Contract Documents Well Abandonment Work Plan and Well Abandonment Work Plan Addendum. With the exception of monitoring well MW-11, all monitoring wells are to be abandoned by over-drilling using hollow stem augers of an appropriate diameter for each respective well. Following the removal of the well casing and all associated materials (i.e., sand, grout, concrete and bentonite), the boreholes will be backfilled from the bottom to Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
34 approximately six inches below ground surface with neat cement grout using tremie pipe to prevent bridging. Well abandonment and backfilling shall be performed in accordance with all requirements of the drilling permit(s) obtained by the Contractor and issued by the County of Mendocino Department of Environmental Health. The Contractor is referred to Appendix “A” (Table B, Sheet 3) for monitoring well construction details. The Contractor is responsible for familiarizing themselves with all access requirements and selecting suitable drilling equipment for the site access constraints including limited access drilling equipment, as applicable. Access agreements for all off-site well locations will be provided to the Contractor by the City. If necessary, the City will provide tree trimming services to allow access for drilling.
The Contractor’s attention is directed to additional requirements for the abandonment of monitoring wells constructed within an 8 5/8-inch diameter steel conductor casing (monitoring wells MW-12B, MW-13B, MW-14B, MW-18B, MW-21B, and MW-23B). These monitoring wells will be over-drilled through the interior of the steel conductor casing and the polyvinyl chloride well casings and well materials (i.e., sand, concrete, and bentonite) will be removed from the boreholes. Next, the uppermost five feet will be over-drilled using an auger of sufficient size to remove the outer concrete in which the steel conductor casing is set and to expose the outer portion of the steel conductor casing for subsequent cutting and removal. The steel conductor casing will then be cut with an extended torch or other suitable equipment at a depth of five feet below ground surface and this portion of the steel conductor casing removed. The removed portion of conductor casing shall become property of the Contractor and disposed of as described in Subsection 13-10. The borehole will then be abandoned by tremie backfilling with cement grout to six inches below ground surface.
Monitoring wells MW-4, MW-6, and MW-19 may have been paved over or otherwise been destroyed during past construction activities. At the surveyed locations of these wells, the contractor shall core the asphalt paving and hand dig to a depth of two feet below ground surface to confirm if the monitoring wells remain. The City will premark the surveyed well locations. For monitoring wells determined to be present, well abandonment and site restoration shall be performed as described herein. For monitoring wells determined to no longer be present, well abandonment is not required; however, site restoration shall be performed as described herein.
Monitoring well MW-11 will be abandoned by pressure grouting due to the proximity of a high-pressure natural gas transmission line. While the Contractor will be responsible for adhering to all conditions of the drilling permits issued by the County of Mendocino Department of Environmental Health, the City understands that the drilling permit will include, at a minimum, the following conditions for pressure grouting:
1. No obstructions, debris, or other materials are allowed to be within the well casing;
2. Cement must be a 21-sack mix (ASTM Type I or Type II Portland Cement to 5-6 pounds of clean water);
3. No more than 5% bentonite gel may be added to the grout mix;
4. The 21-Sack Mix must not have any lumps; and
5. The pressure must hold a minimum of 25 pounds per square inch for five minutes at the well head, not the compressor, or after completely filling the well inner casing with cement one third of the filled volume is displaced due to the pressure.
Monitoring well boxes are to be removed at each monitoring well location, which shall become property of the Contractor and disposed of as described in Subsection 13-10. Monitoring wells are to be restored to the specifications described above in Section 13-07.
13-09.2. Remediation Wells: The Contractor shall properly abandon the following twenty-eight (28) remediation wells: DPE-1, DPE-2, DPE-3, DPE-4, DPE-5, DPE-6, DPE-7, DPE-8, DPE-9, DPE-10, DPE-11, DPE-12, OS-1, OS-2, OS-3, OS-4, OS-5, OS-6, OS-7, OS-8, OS-9, OS-10, OS-11, OS-12, OS-13, OS-14, OS-15, and OS-16.
Pneumatic groundwater remediation pumps and associated conveyance tubing shall be removed from each remediation well prior to well abandonment and placed within a secure location to be designated by the City. As specified in the Contract Documents Well Abandonment Work Plan and Well Abandonment Work Plan Addendum, with the exception of remediation well DPE-9, all remediation wells are to be abandoned by over-drilling using hollow stem augers of an appropriate diameter for each respective well. Following the removal of the well casing and all associated materials (i.e., sand, grout, concrete and bentonite), the boreholes will be backfilled from the bottom of the well to approximately 24 to 36 inches below ground surface (i.e., to the bottom of the well box) with neat cement grout using tremie pipe to prevent bridging. Well abandonment and backfilling shall be performed in Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
35 accordance with all requirements of the drilling permits obtained by the Contractor and issued by the County of Mendocino Department of Environmental Health. The Contractor is referred to Appendix “A” (Table C, Sheet 3) for remediation well construction details. The Contractor is responsible for familiarizing themselves with all access requirements and selecting suitable drilling equipment for the site access constraints. Access agreements for all off-site well locations will be provided to the Contractor by the City. If necessary, the City will provide tree trimming services to allow access for drilling.
Remediation well DPE-9 will be abandoned by pressure grouting due its location underneath a vehicle lift. While the Contractor will be responsible for adhering to all conditions of drilling permits issued by the County of Mendocino Department of Environmental Health, the City understands that the drilling permit will include, at a minimum, the following conditions for pressure grouting:
1. No obstructions, debris, or other materials are allowed to be within the well casing;
2. Cement must be a 21-sack mix (ASTM Type I or Type II Portland Cement to 5-6 pounds of clean water);
3. No more than 5% bentonite gel may be added to the grout mix;
4. The 21-Sack Mix must not have any lumps; and
5. The pressure must hold a minimum of 25 pounds per square inch for five minutes at the well head, not the compressor, or after completely filling the well inner casing with cement one third of the filled volume is displaced due to the pressure.
With the exception of DPE-9, remediation well boxes are to be removed at each remediation well location and will become property of the Contractor to be disposed of as described in Subsection 13-10. The well box at remediation well DPE-9, which is located beneath a vehicle lift, will not be removed and the lid re-installed following abandonment of this well by pressure grouting. Remediation wells are to be restored to the specifications described above in Section 13-08.
13-09.3. Measurement and Payment:
Measurement and Payment – Well Abandonment - Site Preparation, Mobilization and Demobilization: Site preparation and equipment mobilization and demobilization will be measured and paid for at a lump sum price, which price shall include full compensation for furnishing all labor, materials, tools, equipment, and other incidental items necessary for doing all the work involved.
Measurement and Payment – Well Abandonment - Agency Fees, Including Permits and Inspections: All agency fees, including permits and inspection fees, will be measured paid for at a lump sum price. The Contractor’s attention is directed to the fact that the monitoring and remediation wells are located on multiple parcels under various ownership requiring multiple drilling permit applications. Signed access agreements will be provided to the Contractor by the City to facilitate the permitting of off-site well locations.
Measurement – Well Abandonment - Monitoring Well Abandonment: Quantity for monitoring well abandonment activities will be determined from the actual vertical foot of monitoring well abandonment.
Payment – Well Abandonment - Monitoring Well Abandonment: Monitoring well abandonment will be paid for at the contract unit price per vertical foot performed, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as described in Section 13-09.1 and as shown on the Plans or as directed by the Engineer.
Measurement – Well Abandonment - Remediation Well Abandonment: Quantity for remediation well abandonment activities will be determined from the actual vertical foot of remediation well abandonment.
Payment – Well Abandonment - Remediation Well Abandonment: Remediation well abandonment will be paid for at the contract unit price per vertical foot performed, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as described in Section 13-09.2 and as shown on the Plans or as directed by the Engineer.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
36 Measurement – Well Abandonment - Cement Grout Well Backfill: Quantity for cement grout backfill will be determined from the actual vertical foot of monitoring and remediation well abandonment.
Payment – Well Abandonment - Cement Grout Well Backfill: Cement grout backfilling of the associated boreholes will be paid for at the contract unit price per vertical foot performed, which price shall include full compensation for furnishing all labor, materials, equipment, tools, and incidentals necessary to complete this item as shown on the Plans or as directed by the Engineer.
13-10. Disposal of Soil Cuttings, Decontamination Water, and Construction Debris. The Contractor is responsible for disposing of all construction debris generated including, but not limited to, concrete, asphalt, well boxes, equipment, fencing, electrical components, and PVC well casings. All federal, state, and local laws for disposal must be adhered to. Drilling cuttings which are generated during the well abandonments will be contained in steel soil bins. Soil bins will be provided by the City and arrangements for the location(s) of soil bins will be confirmed at a pre-construction meeting but will be located within the City of Ukiah Corporation Yard property. Any equipment necessary to transport drilling cuttings and fill soil bins, will be the responsibility of the Contractor. Any decontamination water and/or groundwater produced during the well abandonment activities will be stored in DOT 17H 55-gallon steel drums to be provided by the Contractor. Contractor is responsible for furnishing all drums necessary to contain decontamination water and/or groundwater generated during well abandonment. The cost for furnishing drums shall be included as part of monitoring and remediation well abandonment. All soil and decontamination water will be disposed of by the City to an approved disposal facility. The Contractor is responsible for disposal of all other construction debris. 13-11. Environmental Control. All necessary precautions to control the discharge of soil sediments to storm drains or other drainage features shall be implemented. 13-12. Cleanup. Following completion of work, Contractor shall remove from jobsite all excess materials, tools, and equipment, and shall legally dispose of all debris resulting from the work. 13-13. Payment. Where estimated quantities of specific items of the work are listed in the bid proposal, the City will measure the actual quantity of such items and will pay an amount equal to the measured quantity multiplied by the unit price bid. Items bid as a lump sum will not be measured. Payment for items bid on a lump sum basis will be in proportion to the completion of that item and its incorporation into the work, not to exceed the total lump sum bid for that item.
SECTION 14. EXCLUSIONS FROM GENERAL CONDITIONS
14-01. Provisions to be Excluded from General Conditions. The following designated provisions of the General Conditions are hereby determined to be inapplicable to the proposed work and, therefore, are hereby excluded from the terms of the Notice to Bidders, Proposal, Agreement and other contract documents as though entirely omitted from said General Conditions:
(1) Section 6-02. Office at the Site
(2) Section 7-03. Surveys
No other exclusions.
SECTION 15. AMENDMENTS TO GENERAL CONDITIONS
15-01. Sections of General Conditions to be Amended.
The following designated sections of the Special Provisions are hereby amended to read as follows:
No amendments.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
37 BID SUBMITTAL CHECKLIST
The following is a checklist to assist you in your submission of your bid documents. Please make sure you include the following when submitting your bid documents to reduce the risk of having your bid rejected:
Did you include?...
o Proposal (Page 38)
Unit prices filled out clearly.
Extended prices filled out clearly and calculated correctly Total bid amount filled out clearly and calculated correctly Sign the proposal, and provide complete information
CLSB No. and expiration date
Department of Industrial Relations Public Works Contractor Registration Number o Fair Employment Practices Certification (Page 42)
Filled out completely per instruction
o Worker’s Compensation Certificate (Page 43)
Filled out completely per instruction
o Certification of Non-Discrimination in Employment (Page 44) Filled out completely per instruction
o List of Proposed Subcontractors (Page 45)
Filled out completely per instruction
o Statement of Experience (Page 46)
o Signature of Bidder (Page 47)
Filled out completely per instruction
Authorized signature provided
o Bidder’s Bond (Page 48)
Filled out completely per instruction
o Non-Collusion Affidavit (Page 49)
Filled out completely per instruction
Notarized
o Addenda Issued
Check the City website for any addenda issued: www.cityofukiah.com/purchasing Please note that actual acknowledgment of addenda is not required to submit with your bid. Refer to Section 1-11 and 3-07 of the General Conditions.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
38 CITY OF UKIAH
MENDOCINO COUNTY, CALIFORNIA
PROPOSAL
FOR
REMEDIATION SYSTEM DECOMMISIONING, SITE RESTORATION AND
ENVIRONMENTAL WELL ABANDONMENT
Specification No. 25-06
The undersigned, as bidder,
declares that he or she has examined thoroughly all of the contract documents herein contained, that this proposal is made without collusion with any other person, firm or corporation and that all laws and ordinances relating to the interest of public officers in this contract have been complied with in every respect.
AND he or she proposes and agrees, if this proposal is accepted, 1) that he or she will contract with the City of Ukiah, Mendocino County, California, in the form of the copy of the agreement herein contained
a) to provide all necessary machinery, tools, apparatus and other means of construction; b) to furnish all materials;
c) to provide all superintendence, overhead expenses and all labor and expenses of whatever nature necessary to complete the job in conformity with the specifications and drawings and other contract provisions herein or reasonably implied hereby or as necessary to complete the work in the manner and within the time named herein and according to the requirements and to the reasonable satisfaction of the City Engineer;
d) to pay all charges of freight transportation and hauling; 2) that he or she indemnifies the City against any loss or damage arising from any act of the undersigned as Contractor; and
3) that he or she will accept as full payment therefor the following sums:
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
39 BIDDING SCHEDULE
In the case of any discrepancy between the unit price and the total set forth for the item, the unit price shall prevail; provided, however, that if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any reason, or is omitted, or in the case of lump sum items, is not the same amount as the entry in the “Total” column, then the amount set forth in the “Total” column for the item shall prevail in accordance with the following:
1. As to lump sum items, the amount set forth in the “Total” column shall be the unit price;
2. As to unit basis items, the amount set forth in the “Total” column shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price.
The Total Base Bid shall be the sum of the items in the “Total” column. In case of discrepancy between the sum of the items in the “Total” column and the amount entered as Total Base Bid, the sum of the “Total” column items shall prevail. The bid comparison will be based on the sum of the items in the “total” column for each bidder.
The Unit prices for the various Construction Items below include all costs associated with the General Conditions, Special Provisions, Requirements of the Construction Contract, and represent the total, complete, in-place cost for each specific Construction Item in accordance with the Construction Documents, including all elements, work components, accessories, and connections, shown in applicable details or required to yield a complete, sound and functional component or system appropriate for its intended function, whether or not such is specifically described or listed in any description of measurement or payment. The total amount of the Construction items below shall represent the total and complete cost of the fully functional Project. All work not specifically listed below be required to complete the work of the various construction items and the cost of such shall be considered as included throughout the various unit prices indicated.
Lowest bid will be based on the lowest Base Bid.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
40 NAME OF BIDDER:
SPEC #: 25-06
PROJECT NAME: REMEDIATION SYSTEM DECOMMISIONING, SITE RESTORATION AND
ENVIRONMENTAL WELL ABANDONMENT
ITEM
NO. DESCRIPTION QUANITITY UNIT OF MEASURE UNIT PRICE EXTENDED PRICE 1 Site Preparation, Mobilization and
Demobilization 1 Lump Sum $_____________ $________________________ 2 Remediation System Disassembly, Removal,
and Disposal 1 Lump Sum $_____________ $________________________ 3 Sawcut Existing Paving – Equipment
Compound Perimeter 120 Linear Foot $_____________ $________________________ 4 Remove, Haul, and Dispose of 6" Concrete
Curb Around Equipment Compound 120 Linear Foot $_____________ $________________________ 5 Remove, Haul, and Dispose Concrete Slab (6"
Thickness) at Equipment Compound. Includes
Removal and Backfill of Grated Sump with CDF
650 Square Foot $_____________ $________________________ 6 Asphalt Concrete Repaving – Equipment
Compound Footprint 650 Square Foot $_____________ $________________________ 7 Abandon Force Main Discharge Connection 1 Lump Sum $_____________ $________________________ 8 Remove, Haul, and Dispose of Removable
Steel Bollards. Backfill with CDF to 6" Minus
and Repave to Match Existing Conditions
7 Each $_____________ $________________________
9 Monitoring Well Box Removal and Restoration 23 Each $_____________ $________________________ 10 Sawcut Existing Asphalt Paving and/or
Concrete at Remediation Well Boxes and
Junction Boxes
376 Linear Foot $_____________ $________________________ 11 Remove, Haul, and Dispose of Remediation
Well Box and Junction Box, Remove Concrete
Collar, and Cut & Cap Conduit
30 Each $_____________ $________________________
12 Backfill Remediation Well Boxes and Junction
Boxes with CDF to 4" Minus 7.5 Cubic Yards $_____________ $________________________ 13 Replace Asphalt Concrete at Remediation Well
Box and Junction Box Locations 390 Square Foot $_____________ $________________________ 14 Backfill Remediation Well Boxes with Class II
Aggregate Base to Final Grade 2.5 Cubic Yards $_____________ $________________________ 15 Agency Fees, Including Permits and
Inspections 1 Lump Sum $_____________ $________________________ 16 Well Abandonment - Monitoring Well
Abandonment 620 Vertical Foot $_____________ $________________________ 17 Well Abandonment - Remediation Well
Abandonment 612 Vertical Foot $_____________ $________________________ 18 Well Abandonment - Cement Grout Well
Backfill (Materials Only) 1,232 Vertical Foot $_____________ $________________________ TOAL BID → $________________________
We, the undersigned, acknowledge that the City Council has reserved the right to reject any or all bids and to determine which proposal is, in its opinion, the lowest responsive bid from a responsible bidder and that which it deems in the best interest of the City to accept. We, the undersigned, further agree, if this proposal shall be Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
41 accepted, to sign the agreement and to furnish the required bonds with satisfactory surety, or sureties, within fifteen (15) calendar days after written notice that the contract is ready for signature; and, if the undersigned shall fail to contract, as aforesaid, it shall be understood that he or she has abandoned the contract and that, therefore, this proposal shall be null and void and the proposal guaranty accompanying this proposal, or the amount of said guaranty, shall be forfeited to and become the property of the City. Otherwise, the proposal guaranty accompanying this proposal shall be returned to the undersigned Witness our hands this day of ___________________, 2025.
Licensed in accordance with an act providing for the registration of California Contractors License No. ___________, expiration date _____________.
THE CONTRACTOR'S LICENSE NUMBER AND EXPIRATION DATE STATED HEREIN ARE MADE UNDER PENALTY OF PERJURY.
Department of Industrial Relations Public Works Contractor Registration Number:_____________________ Signature of bidder or bidders, with business name, address, phone number and fax number:
_________________________________________________________________ _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Notice: In the case of a corporation, give below the addresses of the principal office thereof and names and addresses of the President, Secretary, Treasurer.
_________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
42 FAIR EMPLOYMENT PRACTICES CERTIFICATION
TO:_____________________________________________________________ ________________________________________________________________ The undersigned, in submitting a bid for performing the following work by Contract, hereby certifies that he or she has or will meet the standards of affirmative compliance with the Fair Employment Practices requirements of the Special Provisions contained herein.
REMEDIATION SYSTEM DECOMMISIONING, SITE RESTORATION AND ENVIRONMENTAL WELL
ABANDONMENT
________________________________________________________________ (Signature of Bidder)
Business Mailing Address:
_________________________________________________
_________________________________________________
_________________________________________________
Business Location:
_________________________________________________
_________________________________________________
(The bidder shall execute the certification of this page prior to submitting his or her proposal.) Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
43 WORKER'S COMPENSATION CERTIFICATE
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Worker's Compensation or undertake self-insurance in accordance with the provisions of that code and I will comply with such provisions before commencing the performance of the work of this contract.
Witness my hand this________ day of _______________, 20____ Signature of Bidder, with Business Address:
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
44 CERTIFICATION OF NONDISCRIMINATION IN EMPLOYMENT
The bidder represents that he or she has/has not, participated in a previous contract or subcontract subject to either the equal opportunity clause herein or the clause contained in Section 301 of Executive Order 10925; that he or she has/has not, filed all required compliance reports; and that representations indicating submission of required compliance prior to subcontract awards.
Signature and address of Bidder:
__________________________________________________ Date_____________ __________________________________________________
__________________________________________________
__________________________________________________
(This certification shall be executed by the bidder in accordance with Section 60-1.6 of the Regulations of the President's Committee on Equal Employment Opportunity for implementing Executive Orders 10925 and 11114.) Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
45 LIST OF PROPOSED SUBCONTRACTORS
In compliance with the provisions of Sections 4100-4108 of the California Public Contract Code and any amendments thereof, each bidder shall set forth (a) the name and location of the place of business of each subcontractor who will perform work or labor or render service in or about the construction site or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications in an amount in excess of one-half of 1 percent of the total bid and (b) the California Contractor License Number for each subcontractor, and (c) the portion of the work to be done by each subcontractor.(See General Conditions Section 1-09.) Include with the name of each subcontractor their Department of Industrial Relations Public Works Contractor Registration Number.
SUBCONTRACTOR
NAME
SUBCONTRACTOR
LICENSE NUMBER
SUBCONTRACTOR
DIR
REGISTRATION
NUMBER
SUBCONTRACTOR
BUSINESS
ADDRESS
DESCRIPTION
OF WORK
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
46 STATEMENT OF EXPERIENCE OF BIDDER
The bidder is required to state below what work of similar magnitude or character he or she has done and to give references that will enable the City Council to judge of his or her experience, skill and business standing and his or her ability to conduct work as completely and rapidly as required under the terms of the contract. ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
47 SIGNATURE(S) OF BIDDER
Accompanying this proposal is ___________________________________ (insert the words "cash ($)", "cashier's check" or "bidder's bond", as the case may be) in an amount equal to at least 10 percent of the bid.
The names of all persons interested in the foregoing proposal as principals are as follows:
IMPORTANT NOTICE: If bidder or other interested person is a corporation, provide the legal name of corporation and also the names of the president, secretary, treasurer and manager thereof. If a co-partnership, provide the true name of firm and also the names of all individual co-partners composing the firm. If bidder or other interested person is an individual, provide the first and last names in full. _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Licensed in accordance with an act providing for the registration of Contractors:
License No. ______________________________, License Expiration Date .
Signature(s) of Bidder: ______________________________________________ ______________________________________________
______________________________________________
NOTE: If bidder is a corporation, the legal name of the corporation shall be set forth above together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation; if bidder is a co-partnership, the true name of the firm shall be set forth above together with the signature of the partner or partners authorized to sign contracts in behalf of the co-partnership; and if bidder is an individual, his or her signature shall be placed above. If a member of a partnership, a Power of Attorney must be on file with the Department prior to opening bids or submitted with the bid; otherwise, the bid will be disregarded as irregular and unauthorized.
Business address: ___________________________________________________ ___________________________________________________
Place of residence: ___________________________________________________ ___________________________________________________
Dated: __________________
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
48 CITY OF UKIAH
Mendocino County, California
BIDDER'S BOND
KNOW ALL MEN BY THESE PRESENTS,
That we, ______________________________________________________________ ________________________________________________________________, as PRINCIPAL and ________________________________________________________________ ________________________________________________________________, as SURETY, are held and firmly bound unto the City of Ukiah in the penal sum of 10 PERCENT OF THE TOTAL AMOUNT OF THE BID of the Principal above named, submitted by said Principal to the City of Ukiah, as the case may be, for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, to the City Clerk to which said bid was submitted, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. In no case shall the liability of the surety hereunder exceed the sum of $____________________
THE CONDITION OF THIS OBLIGATION IS SUCH,
That whereas the Principal has submitted the above mentioned bid to the City of Ukiah, as aforesaid, for certain construction specifically described as follows, for which bids are to be opened at the Office of the City Clerk, Ukiah Civic Center, Ukiah, California, on TBD for REMEDIATION SYSTEM DECOMMISIONING, SITE RESTORATION AND ENVIRONMENTAL WELL ABANDONMENT.
NOW, THEREFORE, If the aforesaid Principal is awarded the contract and, within the time and manner required under the specifications, after the prescribed forms are presented to him or her for signatures, enters into a written contract, in the prescribed form, in accordance with the bid and files two bonds with the City of Ukiah, one to guarantee faithful performance and the other to guarantee payment for labor and materials, as required by law, then this obligation shall be null and void; otherwise, it shall be and remain in full force and virtue.
IN WITNESS WHEREOF, we have hereunto set our hands and seals on this ______ day of ________________, A.D. 20_____.
__________________________________________________(Seal) __________________________________________________(Seal) __________________________________________________(Seal) Principal
__________________________________________________(Seal) __________________________________________________(Seal) __________________________________________________(Seal) Surety
Address: __________________________________________________________ __________________________________________________________ __________________________________________________________ Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
49 NON-COLLUSION AFFIDAVIT
Note: Bidder shall execute the affidavit on this page prior to submitting his or her bid.
To City Council, City of Ukiah:
The undersigned in submitting a bid for performing REMEDIATION SYSTEM DECOMMISIONING, SITE
RESTORATION AND ENVIRONMENTAL WELL ABANDONMENT
by contract, being duly sworn, deposes and says:
that he or she has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract.
__________________________________________________
__________________________________________________
__________________________________________________
Signature(s) of Bidder
Business Address:__________________________________________________ __________________________________________________
__________________________________________________
Place of Residence:__________________________________________________ __________________________________________________
__________________________________________________
NOTARIZATION
Subscribed and sworn to before me this ______ day of _________, 20____. __________________________________________________
Notary Public in and for the County of______________________________, State of California.
My Commission Expires ________________________, 20 ____.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
50 CITY OF UKIAH
Mendocino County, California
AGREEMENT
FOR
REMEDIATION SYSTEM DECOMMISIONING, SITE RESTORATION AND
ENVIRONMENTAL WELL ABANDONMENT
Specification No. 25-06
THIS AGREEMENT, made this ______ day of ___________________, 20____, by and between the City of Ukiah, Mendocino County, California, hereinafter called the City and _______________________ hereinafter called the Contractor,
WITNESSETH:
WHEREAS, the City has caused to be prepared in accordance with law, specifications, drawings and other contract documents for the work herein described and shown and has approved and adopted these contract documents, specifications and drawings and has caused to be published in the manner and for the time required by law a notice to bidders inviting sealed proposals for doing the work in accordance with the terms of this contract and
WHEREAS, the Contractor, in response to the notice to bidders, has submitted to the City a sealed proposal accompanied by a proposal guaranty in an amount of not less than 10 percent of the bid price for the construction of the proposed work in accordance with the terms of this contract and WHEREAS, the City, in the manner prescribed by law, has publicly opened, examined and canvassed the proposals submitted and as a result has determined and declared the Contractor to be the lowest and best regular responsible bidder for the work and for the sums named in the proposal, NOW, THEREFORE, THIS AGREEMENT WITNESSETH:
Article 1. Work to be Done and Contract Days Allowed.
That the Contractor shall provide all necessary machinery, tools, apparatus and other means of construction; shall furnish all materials, superintendence, overhead, expenses, all labor and expenses of whatever nature necessary for completion of the work in conformity with the Special Provisions and other contract documents hereto attached and according to such instructions as may be given by the Engineer. The Contractor shall complete the work within sixty (60) calendar days. Contract days shall be counted starting with the 10th day following receipt of notice that the contract has been executed by the City. Contractor, at his or her option, may begin work prior to start of counting contract days, however, in no event shall the Contractor start work without giving notification to the Engineer at least 72 hours prior to the start of work, without obtaining an encroachment permit from the City, or without having submitted certificates of insurance that have been accepted and approved by the Engineer Article II. Contract Prices.
That the City shall pay the Contractor the prices stated in the proposal submitted by the Contractor, for complete performance of the contract by the Contractor. The Contractor hereby agrees to accept the prices as full Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
51 compensation for all material and appliances necessary to the work, for all labor and use of tools and other implements necessary to execute the work contemplated in this contract; for all loss or damage arising out of the nature of the work or from the action of the elements, or from any unforeseen obstructions or difficulties which may be encountered in the prosecution of the work; for all risks of every description connected therewith; for all expenses of the work, as herein specified; for all liability and other insurance, for all overhead and other expenses incident to the work; all according to the Contract Drawings, the Special Provisions, the Details, the instructions and the requirements of the City.
Article III. Labor Discrimination.
Attention is directed to Section 1735 of the Labor Code, which reads as follows:
"No discrimination shall be made in the employment of persons upon public works because of the race, color, national origin or ancestry, or religion of such persons and every contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter." In connection with the performance of work under this contract, the Contractor agrees as follows:
(a) The Contractor will not willfully discriminate against any employee or an applicant for employment because of race, color, religion, ancestry, or national origin. The Contractor will take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to their race, color, religion, ancestry, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the awarding authority setting forth the provisions of this Fair Employment Practice section. (b) The Contractor will send to each labor union or representative of workers with which he or she has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the awarding authority, advising the said labor union or worker's representative of the Contractor's commitments under this section, to employees and applicants for employment. (c) The Contractor will permit access to his or her records of employment, employment advertisements, application forms and other pertinent data and records by the Fair Employment Practices Commission, City of Ukiah or any other appropriate agency of the State of California designated by the awarding authority, for the purposes of investigation to ascertain compliance with the Fair Employment Practices section of this contract.
(d) A finding of willful violation of the Fair Employment Practices section of this Contract or of the Fair Employment Practices Act shall be regarded by the awarding authority as a basis for determining the Contractor to be not a "responsible bidder" as to future contracts for which such Contractor may submit bids, for revoking the Contractor's pre-qualification rating, if any and for refusing to establish, reestablish or renew a pre-qualification rating for the Contractor.
The City of Ukiah shall deem a finding of willful receipt of written notice from the Fair Employment Practices Act to have occurred upon that it has investigated and determined that the Contractor has violated the Fair Employment Practices Act and has issued an order under Labor Code Section 1426 or obtained an injunction under Labor Code Section 1429.
Upon receipt of such written notice from the Fair Employment Practices Commission, the City shall notify the Contractor that unless he or she demonstrates to the satisfaction of the awarding authority within a stated period that the violation has been corrected, his or her pre-qualification rating will be revoked at the expiration of such period.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
52 (e) The Contractor agrees that should the City determine that the Contractor has not complied with the Fair Employment Practices section of this Contract, then pursuant to Labor Code Section 1735 and 1775 the Contractor shall, as a penalty to the City, forfeit for each calendar day or portion thereof, for each person who was denied employment as a result of such non-compliance, the penalties provided in the Labor Code for violation of prevailing wage rates. Such monies may be recovered from the Contractor. The City may deduct any such damages from any monies due the Contractor. (f) Nothing contained in this Fair Employment Practices section shall be construed in any manner of fashion so as to prevent the City or the State of California from pursuing any other remedies that may be available at law.
(g) Prior to awarding the Contract, the Contractor shall certify to the awarding authority that he or she has or will meet the following standards for affirmative compliance, which shall be evaluated in each case by the awarding authority:
(1) The Contractor shall provide evidence, as required by the City that he or she has notified all supervisors, foremen and other personnel officers in writing of the content of the anti-discrimination clause and their responsibilities under it.
(2) The Contractor shall provide evidence, as required by the City, that he or she has notified all sources of employees’ referrals (including unions, employment agencies, advertisements, Department of Employment) of the content of the anti-discrimination clause. (3) The Contractor shall file a basic compliance report, as required by the City. Willfully false statements made in such reports shall be punishable as provided by law. The compliance report shall also spell out the sources of the work force and who has the responsibility for determining whom to hire, or whether or not to hire.
(4) Personally, or through his or her representatives, the Contractor shall, through negotiations with the unions with whom he or she has agreements, attempt to develop an agreement which will:
a. Spell out responsibilities for nondiscrimination in hiring, referral, upgrading and training. b. Otherwise implement an affirmative anti-discrimination program in terms of the unions' specific areas of skill and geography to the end that qualified minority workers will be available and given and equal opportunity for employment.
(5) The Contractor shall notify the City of opposition to the anti-discrimination clause by individuals, firms or organizations during the period of its pre-qualification. (h) The Contractor will include the provisions of the foregoing paragraphs 1 through 5 in every first tier subcontract so that such provisions will be binding upon each such subcontractor. (i) The "Fair Employment Practices Certification" must be completed and signed prior to the time of submitting the bid.
Article IV. Parts of the Contract.
That the complete contract consists of the following documents, all of which shall be considered a part of this agreement.
1. Notice to Bidders
2. Wage Rates
3. General Conditions
4. Technical Specifications
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
53 5. Proposal
6. Fair Employment Practices Certification
7. Agreement
8. Contract Bonds
9. Contract Drawings and Construction Details
10. Standard Drawings
11. Indemnification Agreement
IN WITNESS WHEREOF, this contract being executed in duplicate and the parties having caused their names to be signed by authority of their duly authorized office this _____ day of _____________, 20____.
CITY OF UKIAH, MENDOCINO COUNTY, CALIFORNIA
By: ______________________________________________________________
CITY MANAGER, CITY OF UKIAH
Attest: ______________________________________________________________
CITY CLERK, CITY OF UKIAH
By: ______________________________________________________________
CONTRACTOR
Attest: ______________________________________________________________ Title: ______________________________________________________________ The foregoing contract is approved as to form and legality this ______ day of ______________, 20 ____. __________________________________________________
CITY ATTORNEY, CITY OF UKIAH
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
54 INDEMNIFICATION AGREEMENT
This Indemnification Agreement is made and entered in Ukiah, California, on _________________, 20____, by and between the City of Ukiah (Ukiah) and ______________________________________ (Contractor).
Contractor is
_________________________________________________________________________________ ___________________________________________ for Ukiah.
As a condition of issuing the work order, attached hereto, Ukiah requires assurance that Contractor will protect Ukiah from damage or damage claims which arise from its performance of the work.
Accordingly, Contractor agrees as follows:
1. Indemnification. Contractor shall indemnify and hold harmless Ukiah and its officers, agents, and employees from and against any claim, loss, or damage, including the legal and other costs of defending against any claim of damage or loss which arises out of the Contractor’s negligent or wrongful performance under the work order attached hereto, except for claims, losses, or damages resulting from the sole and exclusive negligence or other wrongful conduct of Ukiah or its officers, agents and employees.
CONTRACTOR
BY: _______________________________________________
TITLE: _______________________________________________ Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
55 CITY OF UKIAH
Mendocino County, California
PERFORMANCE BOND
BOND No._____________________
KNOW ALL PERSONS BY THESE PREESNTS:
THAT WHEREAS, the City of Ukiah, organized and operating under the laws of the State of California, (hereinafter referred to as the “City”) has awarded to ______________________________, (hereinafter referred to as the “Contractor”) an agreement for Contract No. _______________ (hereinafter referred to as the “Project”).
WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract for the Project dated _______________________, (hereinafter referred to, together with all attachments and exhibits thereto, as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and WHEREAS, the Contractor is required by the Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.
NOW, THEREFORE, we, __________________________, the undersigned Contractor and _________________________, as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held firmly bound until the City in the sum of ______________________________ ($_________________), for which amount well and truly to be made, we bind ourselves, our heirs ,executors and administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations; and shall indemnify and save harmless the City, its officials, officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorneys’ fees, incurred by the City in enforcing such obligation.
As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by the City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract Documents, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.
Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
56 ii. Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs by the City pursuant to the Contract Documents.
Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.
Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
57 IN WITNESS WHEREOF, we have hereunto set our hands and seals this ____ day of ___________________, 2025.
(Corporate Seal) ________________________________
Contractor/Principal
By______________________________
Title_____________________________
(Corporate Seal) _________________________________
Surety
By_______________________________
Attorney-in-Fact
(Attach Attorney-in Fact Certificate) Title______________________________ The rate of premium on this bond is __________________ per thousand. The total amount of premium charges is $_________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM.
Any claims under this bond may be addressed to:
(Name and Address of Surety) ________________________________ ________________________________
________________________________
(Name and Address of Agent or ________________________________ Representative for service of process in ________________________________ California, if different from above) ________________________________ (Telephone number of Surety and Agent _______________________________ or Representative for service of process in California) Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
58 CITY OF UKIAH
Mendocino County, California
PAYMENT BOND
BOND No. ____________________
KNOW ALL PERSONS BY THESE PRESENTS:
WHEREAS, the City of Ukiah (“City”) has awarded to _______________________ (“Contractor/Principal”) a contract (City Agreement No. _____________, dated _________________, ___________, referred to as the “Agreement”) for the work described as _______________________. The Agreement is incorporated by this reference into this Payment Bond (“Bond”); and
WHEREAS, Contractor/Principal is required to furnish a bond in connection with the Agreement and pursuant to California Civil Code section 9550;
NOW, THEREFORE, we ____________________________________________, the undersigned Contractor/Principal, and _____________________ (“Surety”), a corporation organized and existing under the laws of the State of _____________________, and duly authorized to transact business under the laws of the State of California, as Surety, are held firmly bound until the City, and to any and all persons, companies, or corporations entitled by law to file stop payment notices under California Civil Code Section 9100, or any person, company, or corporation entitled to make a claim on this bond, in the sum of $_________________________, for which payment will and truly be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if Contractor/Principal, its heirs, executors, administrators, successors, or assigns, or subcontractor, shall fail to pay any person or persons named in Civil Code section 9100; or fail to pay for any materials, provisions, or other supplies, used in, upon, for , or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code, with respect to work or labor thereon of any kind; or shall fail to deduct, withhold, and pay over to the Employment Development Department, any amounts required to be deducted, withheld, and paid over by Unemployment Insurance Code Section 13020 with respect to work and labor thereon of any kind, then Surety will pay for the same, in an amount not exceeding the amount herein above set forth, and in the event suit is brought upon this bond, also will pay such reasonable attorneys’ fees as shall be fixed by the court, awarded and taxed as provided in California Civil Code Section 9550, et seq.
It is further stipulated and agreed that the Surety of this bond shall not be exonerated or released from the obligation of the bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, or specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described; or pertaining or relating to the furnishing of labor, materials, or equipment therefor; nor by any change or modification of any terms of payment or extension of time for payment pertaining or relating to any scheme or work of improvement herein above described; nor by any rescissions or attempted rescission of the contract, agreement or bond; nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond; nor by any fraud practiced by any person other than the claimant seeking to recover on the bond; and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is give; and under no circumstances shall the Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the Owner and Contractor/Principal or on the part of any oblige named in such bond; that the sole condition of recovery shall be that the claimant is a person described in California Civil Code section 9100, and who has not been paid the full amount of his or her claim; and that the Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned, including but not limited to the provisions of section 2819 and 2845 of the California Civil Code.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
59 Any notice to Surety may be given in the manner specified in the Agreement and delivered or transmitted to Surety as follows:
Attn:__________________________________________
Address:_______________________________________
City/State/Zip:___________________________________
Phone:_________________________________________
Fax:___________________________________________
Email:__________________________________________
IN WITNESS WHEREO, two identical counterparts of this Bond, each of which shall for all purposes be deemed an original thereof, have been duly executed by Contractor/Principal and Surety above named, on the __ day of ____________________, 202__.
__________________________________ (SEAL)
Contractor/Principal
By_____________________________________
Contractor’s Representative
______________________________________
Contractor/Principal’s Address
______________________________________
City,State,Zip
_________________________________(SEAL)
Surety
By_____________________________________
Surety’s Representative
______________________________________
Surety’s Address
______________________________________
City,State,Zip
______________________________________
Telephone Number
NOTE: Signatures of those executing for Surety must be properly acknowledged, The bond must be accompanied by a properly acknowledged Power of Attorney from the Surety authorizing its agent to bind it to this bond. A copy of such Power of Attorney must be in file with the City.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
60 DIRECTIONS FOR PREPARATION OF PERFORMANCE AND MATERIAL AND LABOR BOND
1. Individual sureties, partnerships, or corporations not in the surety business will not be acceptable.
2. The name of the Principal shall be shown exactly as it appears in the Contract.
3. The penal sum shall not be less than required by the Specifications.
4. If the Principals are partners or joint venturers, each member shall execute the bond as an individual and state his place of residence.
5. If the Principal is a corporation, the bond shall be executed under its corporate seal.
If the corporation has no corporate seal, it shall so state and affix a scroll or adhesive seal following the corporate name.
6. The official character and authority of the person(s) executing the bond for the Principal, if a corporation, shall be certified by the Secretary or Assistant Secretary thereof under the corporate seal, or copies attached to such records of the corporation as will evidence the official character and authority of the officer signing, duly certified by the Secretary or Assistant Secretary, under the corporate seal, to be true copies.
7. The current power-of-attorney of the person signing for the surety company must be attached to the bond.
8. The date of the bond must not be prior to the date of the Contract.
9. The following information must be placed on the bond by the surety company:
a. The rate of premium in dollars per thousand; and
b. The total dollar amount of premium charged.
10. The signature of a witness shall appear in the appropriate place attending to the signature of each party of the bond.
11. Type or print the name underneath each signature appearing on the bond.
12. An executed copy of the bond must be attached to each copy of the Contract (original counterpart) intended for signing.
Draft
Remediation System Decommissioning Spec No. 25-06
Site Restoration and
Well Abandonment
61 CITY OF UKIAH
Mendocino County, California
DEFECTIVE MATERIAL AND WORKMANSHIP (MAINTENANCE) BOND
KNOW ALL MEN BY THESE PRESENTS,
That we, _____________________________________________________________________ __________________________________________________________________, as PRINCIPAL and__________________________________________________________________________ ___________________________________________________________________, as SURETY, are held and firmly bound unto the City of Ukiah as Obligee, in the penal sum of ___________________________________________________________________________________ _________________________________________________________($____________________), (5 PERCENT OF THE FINAL CONTRACT AMOUNT)
to which payment well and truly to be made, we do bind ourselves, our and each of our heirs, executors, administrators successors and assigns jointly and severally, firmly by these presents.
WHEREAS, the said Principal entered into a Contract with the City of Ukiah dated_________________________
for _________________________________________________________________________________ ____________________________________________________________________________________ WHEREAS, said Contract has been completed, and was approved on the ______ day of ___________, _________,
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall guarantee that the work will be free of any defective materials or workmanship which become apparent during the period of one (1) year following completion of the Contract, then this obligation shall be void, otherwise to remain in full force and effect, provided however, any additional warranty or guarantee whether expressed or implied is extended by the Principal or Manufacturer only, and the surety assumes no liability for such a guarantee.
Signed, sealed, and dated this __________ day of ____________, 20_____. __________________________________________________(Seal) BY:_______________________________________________(Seal) __________________________________________________(Seal) Principal
__________________________________________________(Seal) BY:_______________________________________________(Seal) __________________________________________________(Seal) Surety
Draft
VICINITY MAP AERIAL MAP NOT TO SCALE ABBREVIATIONS MW-3 A
3 LEGEND INDEX TO SHEETS SHEET NO. TITLE NOT TO SCALE BENCHMARK OS-8 DPE-8 17 SITE PROJECT 1Submittal / Revision:234567
1 1320 AIRPORT ROAD
UKIAH, CALIFORNIA
TITLE SHEET City of Ukiah REMEDIATION SYSTEM DECOMMISSIONING SITE RESTORATION AND ENVIRONMENTAL WELL ABANDONMENT 1320 AIRPORT ROAD UKIAH, CALIFORNIA MENDOCINO COUNTY, CALIFORNIA APN 003-280-050 SPECIFICATION No. ___-_____ ’ PROJECT SITE OFF-SITE WELL LOCATIONS
REMEDIATION SYSTEM DECOMMISSIONING, SITE RESTORATION, AND ENVIRONMENTAL WELL ABANDONMENT JB-1 Attachment 4
MW-5 MW-8 MW-2 MW-7 MW-6 MW-3 B-1 B-2 B-3 MW-4 B-15 B-14 B-13 B-12 B-11 B-16 B-10 AIRPORT ROAD B-6 (B-7) (B-4) B-17 UKIAH WELL #2 (B-8) (B-5) (B-9) MW-10 (B-21) B-18 B-19 NORTHWEST PACIFIC RAILROAD CPT-5 CPT-1 CPT-4 CPT-2 CPT-7 CPT-3 OS-4 OS-3 OS-2 OS-1 DPE-1 DPE-2 DPE-4 DPE-3 MW-12B OS-6 OS-5 OS-9OS-10 OS-8 OS-7 OS-11 H5 OS-14OS-15OS-16 OS-13 OS-12 DPE-12 DPE-8 DPE-6 DPE-5 DPE-7 DPE-2 DPE-10 DPE-9 DPE-11 OS-2 OS-1 DPE-1 DPE-3 OS-4 DPE-4 OS-3 K5 (E) FORCE MAIN DISCHARGE CONNECTION TO BE DEMOLISHED SEE FOR EXISTING CONDITIONS CAUTION - (E) HIGH PRESSURE GAS (LOCATION APPROXIMATE) CAUTION - (E) ELECTRIC LINES (LOCATION APPROXIMATE) (E) CANOPY STRUCTURE TO REMAIN 1Submittal / Revision: 234567 1320 AIRPORT ROAD
UKIAH, CALIFORNIA 2
REMEDIATION SYSTEM COMPOUND DEMOLITION PLAN REMOVE (E) BOLLARD & FOOTING (TYP OF 7) SEE DETAIL FOR EXISTING CONDITIONS I5 City of Ukiah
REMEDIATION SYSTEM DECOMMISSIONING, SITE RESTORATION, AND ENVIRONMENTAL WELL ABANDONMENT F5 E5 GRATED SUMP 1'X1'X1.5' DEEP WITH 4" WALLS REINFORCED WITH #4 BARS AT 12" O.C EA. WAY G5 REMOVE (E) CONCRETE CURB SEE EXISTING CONDITIONS FOR OZONE SPARGE WELL DEMOLITION SEE SHEET 3 (TYP) FOR DUAL PHASE EXTRACTION WELL DEMOLITION SEE SHEET 3 (TYP) J5 SEE FOR PROPOSED CONDITIONS REMOVE JUNCTION BOX SEE FOR EXISTING CONDITIONS SEE FOR PROPOSED CONDITIONS SEE PROJECT SPECIAL
PROVISIONS FOR ADDITIONAL
DETAILS/CLARIFICATIONS
REGARDING DEMOLITION
REQUIREMENTS CLEANOUT TO GRADE REMOVE (E) EQUIPMENT COMPOUND SEE FOR EXISTING CONDITIONS Attachment 4
AIRPORT ROAD
NORTHWEST PACIFIC RAILROAD
UKIAH WELL #2 OS-4
OS-3
OS-2
OS-1
DPE-1
DPE-4
EW-1 DPE-3
AIRPORT PARK BOULEVARD
PacBell
MW-21B
MW-22
MW-23B
MW-24
SB-7
SB-8
SB-6
SB-5
SB-3
SB-4
APN
180-008-016
APN
180-008-025
CPT-13
MW-14B
MW-15
MW-13B
MW-19
MW-20
MW-6
MW-10
MW-11
MW-12B
MW-17
MW-18B
MW-7
MW-2
MW-4
MW-5
MW-8
B-1
B-2 B-3
B-15
B-14
B-13
B-11 B-12
B-16
B-10
B-6
(B-7)
(B-4)
B-17
(B-8)
(B-5)
(B-9)
(B-21)
(B-22)
B-18
B-19
CPT-5
CPT-6
CPT-10
CPT-12
CPT-9 CPT-8
CPT-14
CPT-13a
CPT-1
CPT-4
CPT-2
CPT-7
CPT-3 MW-16
CPT-11
UKIAH MUNICIPAL AIRPORT RUNWAY
P-2
P-1 OS-10
OS-9
OS-8
OS-7
OS-5
OS-13
OS-14
OS-11 OS-6
DPE-12
DPE-10
DPE-11
DPE-9
DPE-8
DPE-6 DPE-5
DPE-7
MW-9
(B-20)
OS-12
OS-15
OS-16
MW-3 DPE-2
1 Submittal / Revision:
2 3
4 5
6 7
UKIAH WELL #2
LEGEND
MW-21B
B-15
CPT-1
MW-3
P-1
REMEDIATION
COMPOUND
DEMOLITION
SEE SHEET 2
DPE-3
OS-1 3
NOTE:
SEE SHEET 4, DETAIL B FOR
UNPAVED AREAS (TYP)
NOTE:
PRESSURE GROUT
DPE-9, LEAVE WELL BOX
NOTE:
PRESSURE GROUT MW-11. HIGH
PRESSURE NATURAL GAS
TRANSMISSION LINE PRESENT. 1320 AIRPORT ROAD UKIAH, CALIFORNIA City of Ukiah ENVIRONMENTAL WELL DEMOLITION PLAN JB-1
REMEDIATION SYSTEM DECOMMISSIONING, SITE RESTORATION, AND ENVIRONMENTAL WELL ABANDONMENT
SEE PROJECT SPECIAL
PROVISIONS FOR ADDITIONAL
DETAILS/CLARIFICATIONS
REGARDING DEMOLITION
REQUIREMENTS
MONITORING WELL TO BE
DEMOLISHED PER PROJECT
SPECIAL PROVISIONS (TYP OF 23)
SEE SHEET 4 FOR
EXISTING & PROPOSED
CONDITIONS (TYP)
DUAL-PHASE EXTRACTION
WELL TO BE DEMOLISHED
PER PROJECT SPECIAL
PROVISIONS (TYP OF 12)
OZONE SPARGE POINT WELL
TO BE DEMOLISHED PER
PROJECT SPECIAL
PROVISIONS (TYP OF 16)
NOTE:
CONTRACTOR SHALL
COORDINATE WITH PRIVATE
PROPERTY OWNER(S)
PRIOR TO OFF-SITE WORK
NOTE:
CONTRACTOR SHALL
COORDINATE WITH PRIVATE
PROPERTY OWNER(S)
PRIOR TO OFF-SITE WORK
NOTE:
MW-19 WELL BOX MISSING.
CORE AND HAND DIG TO 2 FEET
TO DETERMINE IF CASING
PRESENT. ABANDON IF FOUND.
NOTE:
RAIL TRAIL PROJECT HAS BEEN
COMPLETED ALONG FORMER
RAILWAY SINCE THE AERIAL PHOTO WAS TAKEN. A PAVED WALKWAY IS NOW PRESENT.
NOTE:
MW-6 WELL BOX MISSING.
CORE AND HAND DIG TO 2 FEET
TO DETERMINE IF CASING
PRESENT. ABANDON IF FOUND.
NOTE:
MW-4 WELL BOX MISSING.
CORE AND HAND DIG TO 2
FEET TO DETERMINE IF CASING
PRESENT. ABANDON IF FOUND.
CITY ENCROACHMENT PERMIT
AND TRAFFIC CONTROL REQUIRED
FOR MW-19 AND MW-20.
C (E) CDF TRENCH BACKFILL (E) SAND BEDDING CONC. COLLAR CDF BACKFILL EXISTING AC OZONE SPARGE, DUAL PHASE EXTRACTION WELL, AND JUNCTION BOX BACKFILL DETAIL SAWCUT NEW AC SAWCUT MATCH EXISTING AC THICKNESS OR 4" MIN. CAP ON (E) PVC CONDUIT, TYP NEAT CEMENT WELL BACKFILL, TYP WELL DETAIL B 24" WELL BOX AT GRADE, (TYP) (TRAFFIC RATED) 24"± 2" OR 4" SCH 40 PVC CONDUIT10"± 2" SCH 80 PVC PIPE DUAL PHASE EXTRACTION 18" CIRCULAR WELL BOX OZONE SPARGE WELL DETAIL A 1Submittal / Revision: 234567 4 1320 AIRPORT ROAD
UKIAH, CALIFORNIA
City of Ukiah 1 1/2" SCH 80 WELL CASING (EXISTING) 12"± 18"± 12"± CONC. COLLAR CDF TRENCH BACKFILL 10"± 8"± SAND BEDDING CONC. COLLAR CDF TRENCH BACKFILL
10"± SAND BEDDING 8"± – – 2" OR 4" SCH 40 PVC CONDUIT D (E) CDF TRENCH BACKFILL (E) SAND BEDDING CONC. COLLAR CLASS II AGGREGATE BASE BACKFILL OZONE SPARGE & DUAL PHASE EXTRACTION WELL BACKFILL DETAIL (NON-PAVED AREAS) SAWCUT SAWCUT CAP ON (E) PVC CONDUIT, TYP NEAT CEMENT WELL BACKFILL, TYP
DETAILS
REMEDIATION SYSTEM DECOMMISSIONING, SITE RESTORATION, AND ENVIRONMENTAL WELL ABANDONMENT 18"±
EQUIPMENT COMPOUND E
1320 AIRPORT ROAD
UKIAH, CALIFORNIA
DETAILS 1Submittal / Revision: 234567 5
City of Ukiah F PVC COND. SCH 40 FOR WATER CONTAINMENT 24" SQUARE JUNCTION BOX AT GRADE, (TYP), (TRAFFIC RATED) 24"± 10"± CONC. COLLAR CDF TRENCH BACKFILL 10"± 8"± SAND BEDDING JUNCTION BOX DETAIL G CONCRETE SLAB #4 REBAR @ 18" O.C. 6" 6" #4 REBAR @ 18" O.C. EA. WAY 6" #4 REBAR CONTINUOUS I 6" 24" ± 10'-0" 4" WYE (E) SEWER GRAVITY LATERAL 4" WYE 4" SS LATERAL CLEANOUT 1 14"x4" REDUCER 1 14" FORCE MAIN H 6"± 8"± (E) AC CONCRETE CLEANOUT BOX PLUG CONCRETE COLLAR FORCE MAIN DISCHARGE AT EXISTING SEWER REMOVABLE BOLLARD CONCRETE CURB
REMEDIATION SYSTEM DECOMMISSIONING, SITE RESTORATION, AND ENVIRONMENTAL WELL ABANDONMENT J JUNCTION BOX BACKFILL DETAIL CAP ON (E) PVC CONDUIT, TYP CDF BACKFILL SAWCUT NEW AC SAWCUT MATCH EXISTING AC THICKNESS OR 4" MIN. G5 I5 (E) SEWER K FORCE MAIN DISCHARGE AT EXISTING SEWER CUT AND CAP ON (E) SS LATERAL CLEANOUT NEW AC SAWCUT SAWCUT MATCH EXISTING AC THICKNESS OR 4" MIN. CDF BACKFILL CDF BACKFILL 4" SS LATERAL CLEANOUT1 14" FORCE MAIN CUT AND CAP ON (E) FORCE MAIN REMOVE BOX
1 Site Preparation, Mobilization and Demobilization Lump Sum 1 -- $42,000.00 2 Remediation System Disassembly, Removal, and Disposal Lump Sum 1 -- $31,850.003 Sawcut Existing Paving – Equipment Compound Perimeter Linear Foot 120 $12.00 $1,440.004 Remove, Haul, and Dispose of 6" Concrete Curb Around Equipment Compound Linear Foot 120 $82.00 $9,840.005 Remove, Haul, and Dispose Concrete Slab (6" Thickness) at Equipment Compound. Includes Removal and Backfill of Grated Sump with CDF Square Foot 650 $33.50 $21,775.006 Asphalt Concrete Repaving – Equipment Compound Footprint Square Foot 650 $20.00 $13,000.00 7 Abandon Force Main Discharge Connection Lump Sum 1 -- $1,515.00 8 Remove, Haul, and Dispose of Removable Steel Bollards. Backfill with CDF to 6" Minus and Repave to Match Existing Conditions Each 7 $510.00 $3,570.00 9 Restore Former Monitoring Well Locations to Match Existing Conditions Each 23 $400.00 $9,200.00 10 Sawcut Existing Asphalt Paving and/or Concrete at Existing Remediation Well Boxes Linear Foot 376 $12.00 $4,512.00 11 Remove, Haul, and Dispose of Remediation Well Box and Junction Box, Remove Concrete Collar, and Cut & Cap Conduit Each 30 $625.00 $18,750.00 12 Backfill Remediation Well Boxes/ Junction Boxes With CDF to 4" Minus Cubic Yards 7.5 $300.00 $2,250.00 13 Replace Asphalt Concrete at Remediation Well Box and Junction Box Locations Square Foot 390 $35.00 $13,650.0014 Backfill Remediation Well Boxes with Class II Aggregate Base to Final Grade Cubic Yards 2.5 $75.00 $187.50 15 Agency Fees, Including Permits and Inspection Lump Sum 1 $10,500.00 $10,500.0016 Well Abandonment - Monitoring Well Abandonment Vertical Foot 620 $75.00 $46,500.0017 Well Abandonment - Remediation Well Abandonment Vertical Foot 612 $85.00 $52,020.0018 Well Abandonment - Cement Grout Well Backfill (Material Cost) Vertical Foot 1,232 $5.50 $6,776.00 TOTAL -- $289,335.50
ENGINEER'S ESTIMATE OF COST
REMEDIATION SYSTEM DECOMMISIONING, SITE RESTORATION AND ENVIRONMENTAL WELL ABANDONMENT
CITY OF UKIAH COPORATION YARD
1320 AIRPORT ROAD, UKIAH, CALIFORNIA
Item No. Description Unit of Measure Quantity Unit Price Estimated Cost
ATTACHMENT
5
Agenda Item No: 14.a.
MEETING DATE/TIME: 12/3/2025
ITEM NO: 2025-1338
AGENDA SUMMARY REPORT
SUBJECT: Discussion, Direction, and Authorization to Staff Regarding the Utility’s Proposed Electric Service Center Solar and Battery Project.
DEPARTMENT: Electric Utility PREPARED BY: Cindy Sauers, Electric Utility Director PRESENTER: Cindy Sauers, Electric Utility Director and Tim Holmes, Kenwood Energy Consultant
ATTACHMENTS:
1. Californias Energy Mix 2023
2. RFP-PV-Hastings-251117
3. 14a Correspondence Received - Cecelia Sullivan_Redacted
4. 14a Correspondence Received - Crispin B. Hollinshead_Redacted
5. Presentation Received
Summary: Council will discuss, provide direction, and authorize Staff to proceed with the proposed Electric Service Center Solar and Battery Project.
Background: Twenty years ago, when California launched the Renewables Portfolio Standard (RPS) program, renewable energy sources represented a modest fraction of the state’s electricity consumption. The latest data from 2023 reveals a significant milestone: over 42 percent of California’s retail electricity sales now stem from RPS-certified renewables. When combined with significant contributions from large hydroelectric and nuclear power sources, a remarkable 67 percent of our state’s retail electricity sales derive from zerocarbon, clean generation sources. See Attachment 1 for a graph detailing California's Progress Toward 100% Clean Electricity. California continues to make substantial strides towards achieving some of the most ambitious clean energy objectives nationwide.
Senate Bill 100, enacted in 2018, established a renewable energy target of 60 percent by 2030, with a longerterm vision of powering 100 percent of California’s retail sales and state loads using RPS-certified renewable and zero-carbon energy by 2045. Recent legislative updates have further reinforced the state's commitment with new interim targets: 90 percent by 2035 and 95 percent by 2040.
The City of Ukiah Electric Utility has been a huge contributor to the State's goals, long before many of these targets were in place, providing Ukiah residents with clean, renewable, and carbon-free energy since the 1970s. The City's energy mix includes eligible renewable power from geothermal, small hydro, and solar, contributing between 40–50% of the Utility's portfolio. Additionally, large hydro, which is classified as carbon free, but not eligible renewable, is a large portion of the City's energy mix. Combined, the Utility boasts between 50–80% carbon-free resources, depending on how much hydro production is achieved, even being touted as one of California's cleanest Utilities by Randy Howard, NCPA General Manager (2022). (Note that these numbers are based on gross energy procured through co-ownership of plants and long-term contracts, but doesn't take into account the sale of Renewable Energy Credits, which the Utility often participates in).
The Utility continues to be dedicated to increasing its supply of energy sourced from eligible renewable and carbon-free resources, recently participating in Grace Orchard Solar and the Trolley Pass Battery Energy
Storage projects. The Utility continuously reviews projects, both behind the City's meter and jointly owned, that are economically and logistically feasible.
Discussion: Staff continually evaluates potential power supply projects to maintain a diverse, reliable, and cost-effective energy portfolio that continues to meet and even exceed State renewable and clean energy goals. Each opportunity is assessed for its feasibility and overall value to the City’s electric customers, with considerations that include project location, generation type, technological maturity, operational longevity, and total cost.
Behind-the-meter projects are often limited by the availability and affordability of suitable land. The Electric Utility’s new Service Center property, however, presents an ideal location for a solar and battery storage installation due to its available space, controlled site conditions, and proximity to existing utility infrastructure.
This site also provides a unique opportunity to integrate additional renewable generation directly into the City’s system while supporting operational resiliency.
Multiple iterations of the concept have been explored (Attachment 2), including adjustments to the solar system size and the incorporation of battery energy storage. The current proposed configuration—anticipated to include approximately 613 kW of solar PV and 280 kWh of storage—is structured as a design-build project to ensure optimal performance, cost efficiency, and constructability. In addition to supplying clean energy to the grid, this installation will provide hands-on operational and maintenance experience for Utility Technicians, further strengthening internal technical capabilities.
The project is expected to benefit all utility customers by enhancing renewable generation within Ukiah’s system, contributing to long-term rate stability, and supporting the City’s commitment to surpassing statewide clean-energy requirements.
Funds are budgeted and available in the Cap and Trade Fund within the Electric Utility.
Staff is requesting Council direction on the proposed project and authorization to proceed with a design-build procurement for the solar and battery energy storage system at the Electric Service Center site.
Recommended Action: Discuss, provide direction, and authorize Staff to proceed with the proposed Electric Service Center Solar and Battery Project.
BUDGET AMENDMENT REQUIRED: No
CURRENT BUDGET AMOUNT: $2,500,000
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: Cap and Trade Funds
REVENUE: Yes GRANT: No
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: Sage Sangiacomo, City Manager; Myles Fisette, Purchasing Manager STRATEGIC PLAN (SP):
CLIMATE INITIATIVES (CI):CI-1d – Continue plan to meet statewide goals for purchased power by 2030.
GENERAL PLAN ELEMENTS (GP):GP-A5 - Environment and Sustainability Element
Attachment 1
Source: https://www.energy.ca.gov/data-reports/clean-energy-serving-california
Kenwood Energy Attachment 2
Energy Management Consulting
1 City of Ukiah
Ukiah Electric
Request for Proposal
Hastings Street Photovoltaic and
Battery Energy Storage System
Proposal Submittal Check List
Proposal Sheets (Attachment 1)
Omissions and Exceptions to the Specification
List of Subcontractors and Material Suppliers
Cost Proposal Submittals – Section 3.1 of the RFP
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
2 PART 1 INTRODUCTION
1.1 The City of Ukiah (City) is seeking proposals for the design-build construction of rooftop and canopy mounted PV systems, and a battery energy storage system (BESS) at 1350 Hastings Avenue, Ukiah, CA.
1.2 The utility of record is Ukiah Electric.
1.3 The selected Contractor shall build as large of a PV system as possible in the given space, estimated to be approximately 613 kW DC.
1.4 The system will consist the arrays shown in the following image.
1.5 PV System Details:
A A parking structure that is approximately 265 feet by 58 feet, with a minimum height of 13’ 6”.
B A waterproof parking structure that is approximately 175 feet by 38 feet, with a minimum height of 13’ 6”. The roofing material shall be standing seem metal.
C A rack mounted PV system that installed on a north roof, that is inclined a minimum of 10 degrees to the south.
D A roof mounted systems facing south.
E A roof mounted system facing east.
F A roof mounted system facing west.
G A shade structure located to the west of the building, estimated at 100 feet by 15 feet
1.6 BESS Details:
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
3 A The BESS shall be rated at 70 kW and 280 kWh.
B The location of the BESS is to be determined.
C The main electric panel is rated at 1,000 maps, 240 volts 3-phase. The max load on the panel is ~415 kW AC. The BESS will require a control system that:
1 Charges the BESS with Solar energy whenever the output of the solar system is greater than the maximum allowed by the electric panel (Excess Solar).
2 Charges the BESS with Grid “Hub” Energy between 10 am and 4 pm whenever the excess solar is not enough to fully charge the BESS (10 am to 4 pm is when Ukiah Electric is able to purchase energy at the lowest rate).
3 The control system will be required to curtail solar output at times when excess solar and grid energy are available and the BESS is fully charged. 4 The following table shows an illustration of when the BESS would be charged with solar energy versus Hub energy.
1.7 Existing Facility electric diagrams are included as Attachment 3, showing solar ready conduits and underground boxes for free-standing canopy.
1.8 PV system aesthetics will be a consideration in final selection, and the selected Contractor will be required to meet the requirements of each individual installation.
1.9 Contacts
A City Contact:
Mary Horger
Procurement Manager
City of Ukiah
-
100
200
300
400
500
1 1325374961738597
109121133145157169181193205217229241253265277289301313325337349361 70 kW BESS with Hub Arbitrage
Draft
Daily Solar for BESS Arbitrage Energy
Kenwood Energy Attachment 2
Energy Management Consulting
4 [email protected]
PART 2 GENERAL
2.1 The Work shall include all materials, labor, equipment, trenching, paving, grading, electric panels, breakers, services, and incidentals necessary to install a complete PV system including, but not limited to, the work included in this Specification.
2.2 At a minimum, the Project shall consist of the design, supply, and installation of equipment, mounting structures, terminal and combiner boxes, DC wiring, DC disconnect, grid-connected inverter, AC disconnect, AC wiring, all utility grade metering equipment, all designed to interconnect with the buildings’ electrical systems, as well as grading and roofing and perimeter fencing and gate installation.
2.3 It is the Contractor’s responsibility to review all available drawings and visit the jobsite to collect and document existing conditions and determine conduit and wiring runs. The Contractor is also responsible for identifying all underground obstructions in the working area via a City approved Underground contractor.
City will support the Contractor by providing all available drawings and institutional knowledge that is available. No allowance shall be made for any additional costs incurred by the Contractor due to failure to properly understand site conditions.
2.4 The Contractor must provide Civil and Structural engineering analysis and documentation, stamped and signed by a Civil or Structural Engineer registered in the State of California, certifying that the PV mounting structures can support any loads resulting from local applicable seismic and wind-load activity. A Professional Engineer in the appropriate discipline must stamp all relevant drawings. All mounting canopies shall have a safety factor of at least 1.5.
2.5 All current California Building Codes and all other applicable codes shall apply.
2.6 The systems shall be designed to meet all local applicable seismic and windload requirements.
2.7 The Contractor is responsible securing, and for compliance with, all permits (building, fire, etc), final City Utility Department sign off, and final City sign off.
2.8 The Contractor shall commission the system per manufacturer’s requirements and provide documentation of proper operation.
2.9 Prevailing Wages apply.
PART 3 PROPOSAL
3.1 SUBMITTALS
1 Email submittals are acceptable.
A The proposer shall complete all of the Proposal Sheets in their entirety.
B Experience and Expertise Information
1 References demonstrating that the Contractor meets the requirements of PART 6
2 Organizational structure of the company.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
5 3 Three references for projects within the last 3 years that are of comparable size and complexity for both PV and BESS
C Product Data Sheets for:
1 PV
a. Modules
b. Inverters
c. Racking
d. Structures
e. Roofing
2 BESS
a. BESS make and model
b. BESS Inverter
c. BESS control system
D System Drawings
1 Preliminary PV system layout
2 Preliminary BESS layout
3 Ground interface
4 Drawings, renderings, single-lines, or pictures that clearly show how the support structures will look.
E Proposed installation schedule.
F Any and all exceptions to the Specification and all RFP documents.
3.2 PROPOSAL EVALUATION
A Value to the City
B Company experience
C Qualifications of Staff
D Clarity of Proposal
E Completeness of Proposal
F References
G How well the proposal and proposal team addresses specific installation challenges.
PART 4 CONSTRUCTION SUBMITTALS
4.1 SUBMITTALS DUE WITH EXECUTION OF THE AGREEMENT:
A General Liability insurance certificate with endorsement B Automobile Liability insurance certificate with endorsement C Executed Workers Compensation Certification
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
6 D Bonds
4.2 PRE-CONSTRUCTION SUBMITTALS
A Waste disposal and recycling plan.
B 50% and 90% detailed design plans including support structure details, mounting details, placement and installation, conduit raceways, conduit sizes, spacing, inverter location, equipment data sheets, etc.
C PV Array calculations including string design, string amperage, array amperage, and DC voltage.
D Professional Engineer (registered in the State of California) verification that the PV systems and the mounting structures and details will meet all local applicable seismic and wind-load requirements per the Specification.
E Certified warranty documentation.
F Installation instructions and Operation and Maintenance (O & M) manuals for all equipment.
G Bench Test (Flash Test) data for each and every PV module. Bench Test data shall be in an Excel format (Due upon delivery of the panels).
H Inverter factory testing results for each inverter(s).
I Data Acquisition System (DAS) specifications, equipment data sheets, and manual.
J Fire jurisdiction approval for fire access.
4.3 POST CONSTRUCTION SUBMITTALS
A Prepare in hard copy and on flash drive in PDF:
1 As-built drawings showing the final placement of all panels, combiner boxes, connections, and conduit placement, electrical plans, including three line diagrams, and elevation drawings showing the final placement of the electrical equipment.
2 O&M Manuals
3 Cleaning instructions for the PV panels and schedule of maintenance. 4 Copies of all start-up procedure measurements.
5 Copies of all testing data and reports.
6 Copies of Utility Operation Approval.
7 Copies of Warranties, transferred to the City.
8 Lien releases from all subcontractors.
PART 5 WARRANTIES
5.1 CONTRACTOR WARRANTY
A The contractor is responsible for ensuring that the system operates as designed.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
7 1 California Public Utility Code 387.5(d)(4) requires that all solar energy systems must have a warranty of not less than 10 years to protect against defects and undue degradation of electrical generation output. 2 The contractor’s proposal will include 5 years of no-cost maintenance services.
3 All solar energy equipment for electricity generation (PV modules, inverters, solar collectors) shall have a minimum 10-year manufacturer performance warranty.
4 All contractors shall provide a minimum 10-year warranty to provide for nocost repair and replacement of the system for any expenses not otherwise covered by the manufacturer.
5 All major BESS components shall have a 10-year warranty.
5.2 All materials used in the construction of the system shall be warranted against degradation for the life of the equipment.
5.3 The Contractor will secure from the roofing system manufacturer a written warranty documents stating that the PV mounting system does not void the manufacturer’s warranty.
5.4 INVERTERS shall be warranted for 20 years from the date of installation.
5.5 QUALITY ASSURANCE
A All generating equipment shall be certified by Underwriter Laboratories (UL).
The system shall be comprised of UL listed components or in cases where a UL listed component is not available, the component shall be listed by another OSHA recognized National Recognized Testing Laboratory (NRTL).
B All installations shall meet or exceed Cal-OSHA requirements for equipment access.
C The installation shall not void the warranty or UL Listing of any existing equipment or electric panels
PART 6 CONTRACTOR EXPERIENCE
6.1 Installation Contractor must hold appropriate licenses and is approved by the manufacturer to complete the installation.
6.2 Subcontractors must hold licenses in the appropriate disciplines.
6.3 Electrical work will be completed by a licensed electrical contractor.
PART 7 MATERIALS SPECIFICATION
7.1 GENERAL
A All components are to be new and direct from the manufacturer; no used or refurbished materials are permitted.
B All materials that are used outdoors shall be sunlight and UV resistant.
C All construction shall meet the requirements of the all California Building Codes.
D Materials shall be designed to withstand the temperatures to which they are Draft
Kenwood Energy Attachment 2
Energy Management Consulting
8 exposed.
E Dissimilar materials should be isolated from one another using nonconductive shims, washers, or other methods.
F Any materials, equipment, or workmanship that is found defective, based on the acceptance tests or for any other reason, shall be reported to City’s Project Manager. Defective material, equipment, and workmanship shall be replaced.
G Metals shall be hot dipped galvanized steel, anodized aluminum, and stainless steel.
H Aluminum shall not be placed in direct contact with concrete materials.
I All fasteners shall be stainless steel grade 316 or better.
J All external electrical conduits shall be rigid schedule 40, galvanized and unpainted.
K All electrical equipment shall be rated for the current and voltage ratings necessary for the application.
L All required over-current protection devices will be included and accessible for maintenance. Each shall have trip ratings no greater than the de-rated amperage of the conductor it protects.
M Drainage – The construction of the system shall not adversely affect water drainage.
N PV Panel wiring and homeruns shall be attached to the mounting system.
Wires and cables shall not droop or hang onto roof surfaces.
O PV module attachment must be four-point equally distributed over the frame
7.2 PV MOUNTING SYSTEMS
A Parking Canopies
1 Parking canopies shall be a cantilevered “T” design. Aesthetics will be subject to approval of the City Staff.
a. The ends of purlins shall be covered by an “end-cap.” b. Canopy installed data systems shall be located at the far end of the canopy.
2 Disabled parking stalls shall be included as required. Provide for and do not restrict access aisles. Provide accessible parking spaces in accordance with California building code requirements.
3 Clearance:
a. Parking canopy height requirements are 13’6”, and shall be appropriately labeled.
b. Fire Access shall meet all requirements of the California Department of Forestry requirements, including:
1. All specification listed below are subject to local fire district approval.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
9 2. Gates shall meet all CA code requirements for access and shall allow for automatic access via fire truck transponders.
3. A minimum clear width of fire department access roads shall be 20 feet.
4. Minimum fire vehicle turning radius:
4.1 20 foot road – Minimum inside radius of 30 feet
4.2 24 foot road – Minimum inside radius of 30 feet
4.3 26 foot road – Minimum inside radius of 25 feet
4 Drainage – The construction of the PV system shall not adversely affect water drainage.
5 Structural – The canopy shall meet all state and federal requirements for the installation of canopies over parking spaces considering the potential for vehicle impact. All vertical support poles within the impact zone from Trucks must be encased in, or installed on, reinforced concrete to three feet in height. The support columns and encasing reinforced concrete must be set to the appropriate depth below ground. The vehicle barrier system shall be designed to resist a static force of 6,000 pounds applied horizontally at 24 inches in height, in any direction to the barrier system and shall have anchorage or attachment capable of transmitting this load to the canopy (see section 1607.7.3 Vehicle barriers in the 2010 California Building Codes for additional details).
6 Structural columns must be closed section structural steel, ASTM A-500 Grade B or better. All vertical support poles that meet with horizontal support beams should be welded. All other purlins must be bolted, not screwed, together. Support canopy main beams and purlins shall be connected with appropriate grade bolts. Sheet metal screws are only acceptable for fastening shear straps, if they are required. Purlins shall be chamfered at 45 degrees.
7 Finishes – All main structural support components must be painted, using an appropriate paint and a color chosen by the City. Except where otherwise indicated, paint will be Sherman Williams B66-350 series semigloss and B66-310 Primer, or equal. Painting will be completed per manufacturer specification and instructions. Color to be selected by the City.
8 Lighting – The contractor will install energy efficient light fixtures that will provide a minimum light level recommended for a parking lot by the Illuminating Engineering Society of North America (IESNA). Light fixtures will be vandal resistant fixtures with impact resistant (lexan) lenses and rated for wet locations. Fixtures will be LED with a minimum CRI of 80, a temperature rating of 4100K and be Dark Sky compliant, i.e., no light above the horizontal plane of the shade.
9 Waterproof Canopy
a. The goal of the waterproof canopy is to provide a waterproof space and entry into the building work-bays. The lower end of the array Draft
Kenwood Energy Attachment 2
Energy Management Consulting
10 should extend over the building roof so that water runoff is controlled through the building’s gutter system. If the array cannot be constructed in that configuration, it shall be equipped with a dedicated gutter system.
b. Sprinkler Systems – as needed to meet Fire safety requirements for the structures.
B Standing-seam roof-mounted
1 Roofing requirements, including the fastening system, shall be consistent with Addendum A. A Professional Engineer in the appropriate discipline shall approve, sign, and stamp the design.
2 Minimum stand-off from the existing roof of 3 inches. 3 The rack and fastening system shall be approved for the application. A Professional Engineer in the appropriate discipline must approve, sign, and stamp the design.
7.3 MODULES
A Q-Cells or equal
B Photovoltaic modules shall be tested in the factory for design performance.
C Modules shall have a linear power output warranty that guaranties not more than 16% power output degradation in the first 30 years from date of purchase. Non-performing panels shall be replaced with identical, or equal panels, at the contractor or manufacturer’s expense.
D All modules shall undergo Bench Testing. The total output of all of the modules, based on the bench test values, shall meet or exceed the kW value included in the contractor’s bid. Individual modules shall have a tolerance of no more than 1% below the module’s rated output.
E Modules shall have a manufacturer materials and workmanship warranty of at least ten years.
7.4 BATTERY ENERGY STORAGE SYSTEM
1 Be rated for operation in ambient temperatures from 0F to 120F 2 Have battery packs that were pre-installed and tested at the factory 3 Have heating/cooling system at the cell level
4 Have roundtrip system efficiency greater than 92% STC. 5 Be designed to operate consistent with utility required power quality 6 Have a market presence:
a. Of more than 2 years serving the US Market.
b. Of more than 50 MW of battery power installed in the US market.
With a demonstrated warranty and repair services within the CA market.
7.5 INVERTER
A PV Inverter shall be SMA Sunny Tri-power or equal.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
11 B The array shall have a dedicated inverter(s) with optimized performance.
C Clipping shall be limited to 15%.
D Installation shall meet all applicable UL 1741, IEEE Standard 929-2000 and standard 519, California electric code, and the latest applicable ANSI and FCC standards and addenda dated prior to the award of the purchase order for this procurement.
7.6 ELECTRICAL ENCLOSURES AND BOXES
A Exterior enclosures and boxes shall be minimum 14 gauge type 316 stainless steel with seams continuously welded and ground smooth, and fast access door latches.
B Interior enclosures and boxes shall be minimum 14 gauge NEMA 3R.
C Outer doors shall have provisions for locking enclosure with standard padlocks.
D A copper ground bus shall be provided in each enclosure or cabinet. It shall have provisions for connecting a minimum of ten grounding conductors.
E Provide thermoplastic data pockets mounted on inside door. The As-Built drawings for the electrical enclosure shall be placed in a watertight plastic wrap and shipped with the enclosure to the jobsite.
7.7 CONDUIT
A All exposed conduit shall be unpainted, schedule 40 Rigid, meeting NEMA/ANSI C80.3 and UL 797 standards.
7.8 WIRE
A All conductors shall be copper, with a minimum conductivity of 98%.
B Wire shall be Class B stranded.
C Insulation of all conductors and cables shall be rated for the voltage of the system.
D Insulation type shall be moisture and heat resistant thermoplastic THWN, rated 90°C in dry locations and 75°C in wet locations, for #8 AWG and smaller. For #6 AWG and larger insulation shall be type XHHW.
E Wire identification - all wires, field and interior (non-field) to equipment, shall be identified with machine permanent ink printed sleeve markers or clip-on markers covered with clear plastic heat shrinkable tubing. Hand lettered wire labels are not acceptable and shall be replaced at the Contractor's expense.
All wires that are electrically the same (connected to common termination points) and do not pass through a contact or other switching device shall have the same wire identification. The wire labeling code for each end of the same wire shall be identical. Tubing shall be sized for the wire and shrunk into place with the properly sized heat gun.
7.9 CIRCUIT BREAKERS
A Circuit Breakers shall be of the indicated type, providing ON, OFF and TRIPPED positions. Circuit breakers shall be quick make, quick break with thermal magnetic action and shall be compatible with existing breaker panel Draft
Kenwood Energy Attachment 2
Energy Management Consulting
12 at the power feed facility. The use of tandem or dual circuit breakers in normal single pole space to provide the number of poles or spaces specified are not acceptable. All multiple-pole circuit breakers shall be designed so that an overload on one pole automatically causes all poles to open. Circuit breakers shall be manufactured by Square D or approved equivalent.
Breakers shall be sized and have the minimum interrupting capacity as required.
7.10 CONCRETE
A Concrete shall conform to Caltrans standard specification for class 2 concrete.
B Concrete mix must exceed the compressive strength requirements of ASTM C387.
C Type I Portland cement must be used.
D Aggregate shall be hard, durable, selected, graded, and free from foreign materials.
E Water shall be potable and free from foreign materials in amounts harmful to the concrete and embedded steel.
F Utilize standard designs incorporating mixtures that facilitate the workability, curing, and strength.
G Forms shall be sized to minimize air pockets and maximize strength.
7.11 ASPHALT AND CONCRETE CUTTING AND REPAIR
A Perform cutting and demolition by methods that prevent damage to other portions of the Work and provide proper surfaces to receive installation of repair and new work.
B Perform fitting and adjusting of products to provide finished installation complying with the specified tolerances and finishes.
C Cuts made through any paved surface must be repaired in a non-discernible fashion. Cuts through concrete must be repaired by replacing the section between the nearest two joints - either construction or expansion. Cuts through asphalt must be repaired so that depressions or humps do not develop in the asphalt surface. If they do, they will have to be corrected, at the Contractor's expense.
D Asphalt and base compaction by "normal traffic" is not permitted. Proper compaction for the depth of the cut is required.
E When cuts extend through pavement markings, the replaced pavement shall be marked to match the existing marks.
7.12 GUTTERS
A Gutters shall be 7 inches deep, and have a 1 to 2% slope for appropriate drainage.
B Gutters shall be coated the same “patina green” color as the roof; use “Kynar 5000” coating and include extended warrantee.
C Downspouts should be “Tundra Gray”; use “Kynar 5000” coating and include Draft
Kenwood Energy Attachment 2
Energy Management Consulting
13 extended warranty. Additional downspouts, if needed, should include an appropriate subdrain system.
7.13 MISCELLANEOUS INSTALLATIONS
A Install two additional two-inch electrical conduits (for future use) between the roof and the electric room, and one additional 2 inch conduit between the water-proof array and the electric room. Both ends of both conduits are to be capped and clearly marked so that the City can locate them when needed.
PART 8 INSTALLATION SPECIFICATION
8.1 GENERAL INSTALLATION REQUIREMENTS
A All safety, electric, building, and labor code requirements at the national, state, and local levels shall be met.
B The installations shall be completed in a “workman like manner.” The areas shall be kept clean and free of obstructions at all times.
C The installations shall be completed per each manufacturer’s installation manual.
D All electrical connections and terminations shall be fully tightened, secured, and strain relieved as appropriate.
E All mounting equipment shall be installed to the manufacturer’s specifications.
F All cables, conduit, exposed conductors, and electrical boxes should be secured and supported according to code requirements.
G All conduits will be installed on structures in such a way as to avoid damage from trucks or automobiles bumping or crushing conduit; i.e., on south side on canopy (near building) steel poles.
H All applicable environmental regulations shall be met.
I System switching and metering equipment shall have convenient access for resetting or repair during electrical outages, and regular monitoring for data retrieval.
J The Contractor shall employ personnel that are skilled and experienced in the installation and connection of all elements, equipment, devices, instruments, accessories, and assemblies. All installation labor shall be performed by qualified personnel who have had experience on similar projects. The Contractor must provide first class workmanship for all installations.
K Ensure that all equipment and materials fit properly in their installations.
L Perform any required work to correct improper installations at no additional expense to the City.
M The City Project Manager reserves the right to halt any work that is found to be substandard or being installed by unqualified personnel.
N Parking: The City will be responsible for the marking of parking spaces.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
14 O Installations shall conform to Manufacturers’ Installation Manuals and approved project drawings and specifications.
P Mounting hardware shall be compatible with the site considerations and environment. Special attention shall be paid to minimizing the risk from exposed fasteners, sharp edges, and potential damage to the units or support canopies. Corrosion resistance and durability of the mechanical hardware shall be emphasized – the use of stainless steel fasteners and aluminum support canopies are required. The use of ferrous metals, wood, or plastic components is not acceptable.
Q The installations shall be completed with minimal impact on the environment.
8.2 PV LABELING
A All strings will be labeled by a unique identifier number that matches the layout of the strings in the line diagrams.
B Permanently affixed labels shall have a red background with white lettering.
Printed material shall be resistant to fading per UL 969.
C Marking is required on all interior and exterior dc conduit, raceways, enclosures, AC and DC disconnects, cable assemblies, and junction boxes to alert the fire service to avoid cutting them.
D Marking shall be placed every 10 feet, at turns and above and/or below penetrations and at all DC combiner and junction boxes.
E Electric Panels and disconnects: A permanent placard with fade resistant material listed per UL 969 shall be installed on exterior and interior of main electrical panels and disconnects stating: “CAUTION: SOLAR PV SYSTEM
MAY REMAIN ENERGIZED AFTER DISCONNECTION DURING
DAYLIGHT HOURS”.
F Parking Canopy Height Requirements: Canopies shall have signage displayed noting the maximum allowable vehicle height.
8.3 WASTE DISPOSAL
A All waste will be disposed of offsite.
B The contractor shall implement a recycling program that addresses all cardboard and plastic components that are used in the packaging and delivery of all materials.
8.4 COORDINATION
A The Contractor shall coordinate the electrical work with the other trades, code authorities and City Project Manager; with due regard to their work, towards promotion of a rapid completion of the Project. If any cooperative work must be altered due to lack of proper supervision of such, or failure to make proper provisions, then the Contractor shall bear expense of such changes as necessary to be made in work of others.
B The Contractor shall cease work at any particular point, temporarily, and transfer operations to such portions of work as directed, when in the judgment of the City Project Manager it is necessary to do so.
C The Contractor shall schedule all the required work with the City Project Draft
Kenwood Energy Attachment 2
Energy Management Consulting
15 Manager, including each shutdown period. Each shutdown shall be implemented to minimize disruption of the existing operations. The Work to be provided under this Contract shall not disrupt any of the existing operations without prior approval.
1 The Contractor shall not have any unscheduled shutdown. 2 Carry out scheduled shutdowns only after the time, date, and sequence of work proposed to be accomplished during shutdown has been favorably reviewed and approved by the City Project Manager. Submit shutdown plans at least 5 working days in advance of Contractor’s preferred scheduled shutdown date.
3 The City Project Manager reserves the right to delay, change, or modify any shutdown at any time, at no additional cost to the City, when the risk of such a shutdown would jeopardize the operation of the facility.
8.5 SUPERVISION
A The Contractor shall schedule all activities, manage all technical aspects of the project, coordinate submittals and drawings, and attend all project meetings.
B The Contractor shall supervise all work, including the electrical system general construction work, from the beginning to completion and final acceptance.
C The Contractor shall supervise and coordinate all work to insure each phase of the project, submittal, delivery, installation, and acceptance testing, etc. is completed within the allowable scheduled time frames.
D The Contractor shall be responsible for obtaining, preparing, completing, and furnishing all paper work, which shall include transmittals, submittals, forms, documents, manuals, instructions, and procedures.
8.6 INSPECTIONS
A All work or materials covered by the Contract documents shall be subject to inspection at any and all times by the City Project Manager. If any material does not conform to the Contract documents, or does not have a approved submittal status; then the Contractor shall, within three days after being notified by the City Project Manager, remove said material from the premises; and if said material has been installed, the entire expense of removing and replacing same, including any cutting and patching that may be necessary, shall be borne by the Contractor.
B The Contractor shall give the City Project Manager 10 working days’ notice of the dates and time for inspection. Date of inspection shall be as agreed upon by the Contractor, Operations Manager and Engineer.
C Work shall not be closed in or covered over before inspection and approval by the City Project Manager. All costs associated with uncovering and making repairs where non-inspected work has been performed shall be borne by the Contractor.
D The Contractor shall cooperate with the City Project Manager and provide assistance at all times for the inspection of the electrical system under this Draft
Kenwood Energy Attachment 2
Energy Management Consulting
16 Contract. The Contractor shall remove covers, provide access, operate equipment, and perform other reasonable work that, in the opinion of the City Project Manager, will be necessary to determine the quality and adequacy of the work.
E The permitting authority shall be notified to perform required inspection either prior to or concurrent with City Project Manager’s inspection in the close out process.
F Before request for final inspection is made, the Contractor shall submit to the City Project Manager in writing, a statement that the Contractor has made his own thorough inspection of the entire project, enumerating punch list items not complete and that the installation and testing is complete and in conformance with the requirements of this Section.
G The City Project Manager may arrange for a facility inspection by Cal-OSHA Consultation Service at any time. The Contractor shall make the necessary corrections to bring all work in conformance with Cal-OSHA requirements, all at no additional cost to the City.
H Contractor will be responsible for any Additional Cost for Overtime, Weekend Overtime or Differential Time, Expenses for Inspection of Defective Work that has to be re-inspected.
8.7 JOB CONDITIONS
A The Contractor shall make all arrangements and pay the costs thereof for temporary services required during construction of the project, such as temporary electrical power. Upon completion of the project, remove all temporary services, equipment, material and wiring from the site as the property of the Contractor.
B The Contractor shall provide adequate protection for all equipment and materials during shipment, storage and construction. Equipment and materials shall be stored in a location specified by the Operations Manager and be completely covered with two layers of plastic and set on cribbing six inches above grade so that they are protected from weather, wind, dust, water, or construction operations. Equipment shall not be stored outdoors without the approval of the Engineer. Where equipment is stored or installed in moist areas, such as unheated buildings, etc., provide an acceptable means to prevent moisture damage, such as a uniformly distributed heat source to prevent condensation.
C The normal outdoor, not in direct sunlight, ambient temperature range of the job site will vary between 30 to 115 degrees Fahrenheit. All equipment shall be rated to operate in these temperature ranges or provisions for adequate heating and cooling shall be installed, at no additional cost to the City.
8.8 SAFETY
A Testing shall conform to the respective manufacturer's recommendations. All manufacturers’ safety precautions shall be followed.
B The procedures stated herein are guidelines for the intended tests, the Contractor shall be responsible to modify these tests to fit the particular application and ensure personnel safety. Absolutely no tests shall be Draft
Kenwood Energy Attachment 2
Energy Management Consulting
17 performed that endanger personal safety.
C The Electrical Contractor shall have two or more Electricians present at all electrical field tests.
D California Electrical Safety Orders (ESO) and Occupational Safety and Health Act (OSHA): The Contractor is cautioned that testing and equipment shall comply with ESO and OSHA as to safety, clearances, padlocks and barriers around electrical equipment energized during testing.
E Field inspections and pre-energization tests shall be completed prior to applying power to equipment.
PART 9 SYSTEM METERS, MONITORING, AND DATA AQUISITION
9.1 DATA ACQUISITION SYSTEM (DAS)
A PowerTrack or equal.
B Include a weather station with wind, temperature, and solar irradiation.
C String level monitoring.
D All measurement equipment must be “revenue” grade.
E AC Power/Energy (including current transformers): Accuracy ± 2% F The DAS shall capture and store data on 15-minute intervals.
G Real-Time display will provide the following information. This information can be viewed via the Internet for the entire term of the warrantee period.
The Contractor will use a regression to establish the system rating at PVUSA Test Conditions as the basis for projecting system output. 1 Instantaneous system output in kW
2 Instantaneous irradiation in watts/square meter.
3 Instantaneous ambient temperature in degrees Fahrenheit 4 Instantaneous wind speed
5 Daily and year-to-date system output in kWh
6 Data shall be provided in a format that easily facilitates graphing and analysis in third party database or spreadsheet programs. 7 Alarms shall be set up to automatically notify facility staff and the City Project Manager of faulty operation. Specific Alarms will include:
a. Inverter output is outside of projected output by more than 10% based on existing irradiance and temperature.
b. Inverter shut down.
PART 10 PROJECT CLOSEOUT
10.1 CLEANING AND TOUCH-UP
A Clean all work areas.
B Clean the solar Panels per the manufacturer’s instructions using deionized water.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
18 C Clean all work areas and remove any debris.
D Prior to startup and completion of the work, and subsequent to final acceptance, all parts of the installation, including all equipment, exposed conduit, devices, and fittings shall be cleaned and given touch up by Contractor as follows:
1 Remove all grease and metal cuttings.
2 Any discoloration or other damage to parts of the building, the finish, or the furnishings shall be repaired. Thoroughly clean any exposed work requiring repairs.
3 Vacuum and clean the inside of all panel and electrical enclosures. 4 Clean all above and below ground pull boxes and junction boxes from all foreign debris prior to final acceptance.
5 Paint all scratched or blemished surfaces with the necessary coats of quick drying paint to match adjacent color, texture, and thickness. This shall include all primed painted electrical equipment, including enclosures, panels, poles, boxes, devices, etc.
6 Repair damage to factory finishes with repair products recommended by Manufacturer.
7 Repair damage to PVC or paint finishes with matching touchup coating recommended by Manufacturer.
10.2 FINAL ACCEPTANCE
A Final acceptance will be given by the City Project Manager after the equipment has passed the final acceptance trial period of one week, each deficiency has been corrected, final documentation has been provided, and all the requirements of design documents have been fulfilled.
B Upon completion of the project, prior to final acceptance, remove all temporary services, equipment, material, and wiring from the site.
C At the end of the project, following the completion of all of the field tests, and prior to final acceptance, the Contractor shall provide the following final documentation to the City Project Manager:
1 A listing of warranty information.
2 Each "operation and maintenance" manual shall be modified or supplemented by the Contractor to reflect all field changes and as-built conditions.
D Acceptance by City Project Manager shall be based on:
1 All operational tests performed to the satisfaction of City Project Manager. 2 Receipt of all final documentations listed above.
3 Receipt of all spare parts.
PART 11 PV SYSTEM START-UP
11.1 START-UP FORMS
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
19 A Complete start-up and testing forms included Attachment 2 B Bill of Materials: Include modules, inverters, disconnects, DAS, and combiner boxes.
C Power conductor test form: Complete a megger test on all wiring at 500 volts for 10 seconds. Each reading shall be a minimum of 100 Meg-Ohms.
D Grounding system test form
1 Visual and Mechanical Inspection.
a. Verify ground system is in compliance with drawings and specifications.
2 Electrical Tests
a. Before making connections to the ground electrodes, and before placement of sidewalks, landscape and paving, measure the resistance of each electrode to ground using a ground resistance tester. Perform the test not less than two days after the most recent rainfall and in the afternoon after any ground condensation (dew) has evaporated.
b. After all individual ground electrode readings have been made, interconnect as required and measure the system’s ground resistance.
c. Perform point-to-point tests to determine the resistance between the main grounding system and all major electrical equipment frames, system neutral, and/or derived neutral points.
d. The grounding test shall be in conformance with IEEE Standard 81. e. Plots of ground resistance shall be made and submitted to the City Project Manager for approval.
f. The current reference rod shall be driven at least 100 feet from the system under test.
g. Measurements shall be made at 10 feet intervals beginning 25 feet from the test electrode and ending 75 feet from it in a direct line between the system being tested and the test electrode. 3 Test Values
a. The resistance between the main grounding electrode and ground shall be no greater than five ohms for commercial or industrial systems per IEEE Standard 142.
b. Investigate point-to-point resistance values that exceed 0.5 ohms.
E System Visual and Mechanical Inspection Form: Complete Forms for all equipment listed below.
1 PV System: complete a form for the inspection of the PV system. Include inspection of all DC connections, conduit, modules, etc. 2 Combiner Box: Complete a form for each combiner box.
3 Inverter: Complete a Form for each Inverter.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
20 4 Disconnects: Complete a form for each AC Disconnect 5 Main Panel
F System Output Measurement Form: The Contractor will establish the initial system output to demonstrate that the system is performing as designed, and to establish a baseline to be used for warranty.
1 The system output will be verified after construction of the system has been completed, on a clear, sunny day, with a minimum insolation of 700 watts per square meter.
2 Data to be collected will include:
a. Volts open circuit
b. Volts maximum power (use max of instantaneous reading) c. Current at maximum power (use the min of instantaneous reading) 3 Voltages and currents shall be measured for each string, combiner box circuit, and the entire array.
4 Irradiance measurements shall be in the plane of the array. 5 Time, irradiance, and temperature measurements must be taken at a minimum of 15 minute intervals
11.2 Start-up shall be per all manufacturers’ instruction.
11.3 System start-up procedure will be as outlined by the Manufacturer’s installation manual and the inverter manual.
11.4 Commission inverters per factory instructions.
11.5 Start up sheets per Attachment 2.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
21 Attachment 1
PROPOSAL SHEETS
PROPOSAL TO: City of Ukiah (OWNER)
1. The undersigned Proposer proposes and agrees, if this Proposal is accepted, to perform the WORK as specified or indicated in said Contract Documents entitled:
“PV CONSTRUCTION”
2. Proposer will accept all of the terms and conditions of the Contract Documents.
3. Unless otherwise required by law. Proposer will enter into an Agreement within the time stated in the Notice of Request for Proposal and will timely furnish the insurance certificates and endorsements, Payment Bond and Performance Bond required by the Contract Documents.
4. Proposer has examined copies of all the Contract Documents.
5. Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, WORK, site, locality where the WORK is to be performed, the requirements of Laws and Regulations, and the conditions affecting cost, progress or performance of the WORK and has made such independent investigations as Proposer deems necessary.
6. The Proposer agrees and certifies all the foregoing, and hereby certifies that all information contained in this Proposal Form, including the Proposal Schedule(s) and Information Required of Proposer, is true and complete. Proposer further agrees if awarded the contract, Proposer (thereafter known as “CONTRACTOR”) will complete the WORK required under the Contract Documents within the Contract Time stipulated in said Contract Documents, and will accept in full payment therefore the Contract Price based on the Total Proposal Price(s) named in the aforementioned Proposal Schedule(s). All representations made by Proposer in this Proposal are made under penalty of perjury.
Dated: Proposer:
By:
(Signature)
Title:
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
22 Complete all cost sheets. Schedule of prices for construction of the “PV CONSTRUCTION” in accordance with the Contract Documents. 1350 Hastings Road
PV System
Item
No. Description Make and Model Quantity Unit Price Total Price 1 PV Modules $
2 Inverters $
3 Western Shade Structures $
4 Stand Alone Canopy $
5 Water Proof Canopy $
6 Roof Mounted Racking $
7 BESS $
8 BESS Control System $
9 Balance of Material $
10 Labor $
11 Other: $
12 Tax $
TOTAL PROPOSAL PRICE: $____________
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
23 PROPOSED PAYMENT SCHEDULE
Provide a schedule of payments for all milestone activities. Ten percent (10%) shall be retained from all payments.
Item
No. Description
% of
Contract Total Price
1 $
2 $
3 $
4 $
5 $
6 $
7 $
8 $
9 $
10 $
11 $
12 $
13 $
14 $
15 $
$
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
24 PROPOSAL SHEET
OMISSIONS AND EXCEPTIONS
List all items that have been omitted from the proposal and any exceptions to this Specification.
Item Description Comments
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 Draft
Kenwood Energy Attachment 2
Energy Management Consulting
25 PROPOSAL SHEET
LIST OF SUBCONTRACTORS AND SUPPLIERS
The Proposer shall list below the name and business address of each California licensed Subcontractor who will perform work or labor or render service under this Proposal and each California licensed Subcontractor that will specially fabricate and install a portion of the WORK in excess of one-half of one percent of the Proposer’s Total Proposal Price, and shall also list the portion of the WORK which will be done by such Subcontractor, in keeping with the intent of Section 4100, et seq. of the Public Contract Code.
Portion of Work
To Be Performed
Subcontr.
License
Number
Subcontractor’s
Part 1 Name & Address
1. 2.
3. 4.
5. Note: Attach additional sheets if required.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
26 INFORMATION REQUIRED OF PROPOSER
NAMED EQUIPMENT/MATERIAL SUPPLIER LIST:
The Proposer shall indicate below which Supplier the Proposer intends to use to furnish under the Proposal, each item of equipment or material listed on this form by writing a supplier specified for that equipment or material (proposed substitutes may be listed on the Proposed Substitute Equipment/Material Supplier List form). If no supplier is named in the Contract Documents, the Proposer may list any supplier whose product meets all of the requirements and technical criteria specified. The listing of more than one supplier for each equipment/material to be furnished with the words "and/or" will not be permitted.
RFP
Section
Equipment/Material Supplier
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
27 INFORMATION REQUIRED OF PROPOSER
PROPOSER’S GENERAL INFORMATION:
The Proposer shall furnish the following information. Additional sheets shall be attached as required.
(1) Proposer’s name and address:
(2) Proposer’s telephone number:
(3) Proposer’s license: Primary classification
State License No. and Expiration Date:
Supplemental classifications held, if any:
Name of Licensee, if different from (1) above:
(4) Name of person who inspected site of proposed WORK for your firm:
Name: Date of Inspection:
(5) Name, address, and telephone number of surety company and agent who will provide the bonds required by the Contract Documents:
(6) ATTACH TO THIS PROPOSAL the experience resume of the person who will be designated Superintendent.
(7) ATTACH TO THIS PROPOSAL a financial statement, references and other information, sufficiently comprehensive to permit an appraisal of Proposer’s current financial condition.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
28 STATEMENT OF EXPERIENCE & QUALIFICATIONS
List at least four jobs that are representative of your firm’s experience and qualifications to perform the improvements required by the Contract Documents.
Jobs listed should include at least four similar public works projects constructed by the Proposer as prime Contractor. Start with the most recent jobs. Be specific when listing "Type of Work Performed”. For all jobs listed, provide all information requested below, including at least one reference with phone number for each of the jobs listed. Attach additional sheets as necessary. Be sure to refer to the specification for minimum requirements for previous work.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
29 Job #1 Job #2
Date of Job
Project Name
Job Location:
kW
Types of Work
Performed (Circle
All that Apply)
Parking Structure
Roof Mounted
Project Management
Project Development
Design and Engineering
Day to Day On-site
Management
Mechanical Construction
Electrical Construction
Commissioning
Parking Structure
Roof Mounted
Project Management
Project Development
Design and Engineering
Day to Day On-site
Management
Mechanical Construction
Electrical Construction
Commissioning
Total Contract Value
$
% of Value
Performed
Sub: % In-house: % Sub: % In-house: %
# of Employees on
Job
Subs: Own: Subs: Own:
Supervised by
Client or Owner
Name and Address
Contact Name &
Phone #
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
30 Job #3 Job #4
Date of Job
Project Name
Job Location:
kW
Types of Work
Performed (Circle
All that Apply)
Parking Structure
Project Management
Project Development
Design and Engineering
Day to Day On-site Management
Mechanical Construction
Electrical Construction
Commissioning
Rebate Processing
Parking Structure
Project Management
Project Development
Design and Engineering
Day to Day On-site
Management
Mechanical Construction
Electrical Construction
Commissioning
Rebate Processing
Total Contract Value
$
% of Value
Performed
Sub: % In-house: % Sub: % In-house: %
# of Employees on
Job
Subs: Own: Subs: Own:
Supervised by
Client or Owner
Name and Address
Contact Name &
Phone #
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
31 ACKNOWLEDGEMENT OF AMENDMENTS TO RFP
Contractor hereby acknowledges receipt of any and all amendments to the RFP.
Amendment No. Date Published Date Received
By: __________________________________ Date: ____________ Name: _______________________________
Title: ________________________________
Name of Contractor: __________________________________________ Draft
Kenwood Energy Attachment 2
Energy Management Consulting
32 INSTALLATION SCHEDULE
Item Starting Week # Ending Week #
1 Contract Week Zero Week Zero
2 Design
3 Permitting
4 Groundwork and Foundation
5 Materials Delivery
6 Materials Installation
7 Commissioning
8 Permission to Operate
9 10 Total Number of Weeks
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
33 CONFLICT OF INTEREST REPRESENTATION AND CERTIFICATION The undersigned hereby acknowledges and affirms that:
• He/she is a duly authorized agent of the Contractor with the authority to submit a Proposal on behalf of the Contractor (corporate or other authorization confirmation may be requested prior to final contract execution). • He/she has read the complete BID and all amendments issued pursuant thereto.
• The Proposal complies with State conflict of interest laws. The Contractor certifies that no employee of its firm has discussed, or compared the Proposal with any other Contractor or City of Ukiah employee, and has not colluded with any other Contractor or City of Ukiah employee.
• If the Contractor's Proposal is accepted by the City of Ukiah, the Contractor will enter into a contract with the City of Ukiah to provide the Services, Systems and Equipment described by the Proposal on the terms mutually acceptable to the City of Ukiah and the Contractor.
THE CITY OF UKIAH RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS.
I hereby certify that I am submitting the attached Proposal on behalf of [Specific Entity Submitting Proposal]. I understand that, by virtue of executing and returning this required response form with the Proposal, I further certify, that the Contractor understands and does not dispute any of the contents of the BID (except as may be noted in the Proposal).
__________________________________________ _____________ Signature of Authorized Official Date
_________________________________________
Printed Name of Authorized Official
_________________________________________
Title of Authorized Official
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
34 Contractor Name: _________________________
Address: _________________________________
Telephone: _______________________________
Fax: ____________________________________
E-Mail: __________________________________
NOTE: If Joint Venture, each member of the joint venture must provide a completed certificate form.
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
35 Attachment 2
Start Up Sheets
POWER CONDUCTOR TEST FORM
EQUIPMENT
NAME: LOCATION
CONDUCTOR
NUMBER
INSULATION TESTS
PHASE TO GROUND PHASE TO PHASE
A B C AB BC CA
NOTES: RECORD INSULATION TEST VALUES IN MEG-OHMS
TESTED BY: DATE:
WITNESS:
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
36 GROUNDING SYSTEM TEST FORM
TEST FORM (TF3)
FALL IN POTENTIAL TEST
MAIN
GROUND
LOCATION
APPLIED
VOLTAGE V
MEASURED
POINT
VOLTAGE
MEASURED
POINT 2
VOLTAGE
MEASURED
POINT 3
VOLTAGE
CALCULATED
RESISTANCE
OHMS
TWO POINT TESTS
EQUIPMENT
NAME
EQUIPMENT
#
CIRCUIT
NUMBER
APPLIED
CURRENT
MEASURED
VOLTAGE
CALCULATED
RESISTANCE
NOTES:
TESTED BY: DATE:
WITNESSED BY:
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
37 VISUAL AND MECHANICAL INSPECTION FORM
EQUIPMENT NAME: LOCATION:
NAMEPLATE DATA
MFG: SERIES #:
MODEL #: U.L.#:
VOLTAGE: PHASE:
AMPERAGE: SERVICE:
GRD. BUS: NEU. BUS:
INSPECTION CHECK LIST
ENTER: A-ACCEPTABLE, R-NEEDS REPAIR OR REPLACEMENT, NA-NOT APPLICABLE
TIGHTEN ALL BOLTS AND SCREWS
TIGHTEN ALL CONDUCTOR AND BUS CONNECTIONS
CHECK BUS BRACING AND CLEARANCE
CHECK MAIN GROUNDING AND CONNECTION SIZE
INSPECT GROUND BUS BONDING
CHECK EQUIPMENT GROUNDS
CHECK CONDUIT GROUNDS AND BUSHINGS
INSPECT NEUTRAL BUS AND CONNECTIONS
CHECK VENTILATION AND FILTERS
CHECK FOR BROKEN/DAMAGED DEVICES
CHECK DOOR AND PANEL ALIGNMENT
INSPECT ANCHORAGE
CHECK FOR PROPER CLEARANCES
REMOVE ALL DIRT AND DUST ACCUMULATION
INSPECT ALL PAINTED SURFACES
CHECK FOR PROPER WIRE COLOR CODES
INSPECT ALL WIRING FOR WIRE LABELS
CHECK FOR PROPER TERMINATIONS
CHECK FOR PROPER WIRE SIZES
INSPECT ALL DEVICES FOR NAMEPLATES
CHECK IF DRAWINGS MATCH EQUIPMENT
CHECK ACCURACY OF OPERATION & MAINTENANCE
TESTED BY: DATE:
WITNESSED BY:
Draft
Kenwood Energy Attachment 2
Energy Management Consulting
38 SYSTEM OUTPUT FORM
DATE:
Panel Make and Model:
STRING
#
PANELS
PER
STRING
TIME PANEL
TEMP
INSOLATION
– W/SF
POA
VOLTS
OPEN
CIRCUIT
VOLTS
CLOSED
CIRCUIT
AMPS
CLOSED
CIRCUIT
TESTED BY: DATE:
WITNESSED BY:
Draft
DATE:
Kenwood Energy
Energy Management Consulting
P.O. Box 692 (707) 695-2158
Kenwood, CA 95452 www.kenwoodenergy.com 39
BILL OF MATERIALS
PROJECT:
DATE:
LOCATION:
PAGE:
SPECIFICATION
SECTION
QTY DESCRIPTION MFG PART # TAG #
Draft
Kenwood Energy
Energy Management Consulting
P.O. Box 692 (707) 695-2158
Kenwood, CA 95452 www.kenwoodenergy.com 40
Attachment 2
Electrical Diagrams
Draft
Kenwood Energy
Energy Management Consulting
P.O. Box 692 (707) 695-2158
Kenwood, CA 95452 www.kenwoodenergy.com 41
Draft
Kenwood Energy
Energy Management Consulting
P.O. Box 692 (707) 695-2158
Kenwood, CA 95452 www.kenwoodenergy.com 42
Draft
Kenwood Energy
Energy Management Consulting
P.O. Box 692 (707) 695-2158
Kenwood, CA 95452 www.kenwoodenergy.com 43
Draft
Kenwood Energy
Energy Management Consulting
P.O. Box 692 (707) 695-2158
Kenwood, CA 95452 www.kenwoodenergy.com 44
Draft
Kenwood Energy
Energy Management Consulting
P.O. Box 692 (707) 695-2158
Kenwood, CA 95452 www.kenwoodenergy.com 45
Draft
Kenwood Energy
Energy Management Consulting
P.O. Box 692 (707) 695-2158
Kenwood, CA 95452 www.kenwoodenergy.com 46
Draft
Chart 6: solar relative to NCPA with variable input values Solar production from NREL.Considering solar costs relative to NCPA costsAble to change values and see economic consequences.battery size 0.28 MWh battery cost $0.25 watt hourPG&E TAC 30.07 $/MWharray size 0 613 megawattsinstalled cost $3.00 per watt dailyarray life 25 years average total array cost $1.839 million life time power $78.53 per MWh 4.190 total battery cost $0.070 million watthour/watt total system $1.909 million
max MW/hr 28 33
Data set from NCPA, TAC to PG&E is both high voltafge ($11.60/MWh) and low voltage ($18.47/MWh) max $/MWh 502.04 $ annual annual annual ave. $/MWh $ 40.43
ANNUAL SUMMER ES TOTAL TOTAL TOTAL TOTAL solar array savings below $40/MWh MWh NCPA COST TAC COST COST production production relative above $60/MWh 104,428.84 $ 4,383,480.14 $ 3,140,175.22 $ 7,523,655.36 1532 230 939.26 NCPA+TAC annual system saviings (16,214.85) $ MWh/MW MWh $ (19,714 05) savings over 25 yrs $ (405,371 30) ANNUAL
DA LY AVE. NCPA AVE. TOTAL AVE. ARRAY ANNUAL ANNUAL ANNUAL ANNUAL MWh /MWh /MWh produciton MWh INCURRED DEFFERED SAVED SAVED 286.11 $ 41 98 $ production from 72.05 array saved 939 26 $ 7,990.75 $ 8,352.22 $ 361.46 $ (16,576.32) from 0.61 power relative (with TAC) by battery from array abov e 1MW array MW array cost NCPA+TAC 0 28
DATE DAY HOUR NCPA $/MWh MWh NCPA COST TAC ($30 07/MWh) TOTAL COST MWh MWh MWh/day INCURRED DEFERRED SAVED SAVED 8/1/2024 Th 1 45.55$ 12.2 555.70 $ 366.85 $ $ 0.000 0.00 922.56 $ - 8/1/2024 Th 2 46.93$ 11.4 534 96 $ 342.80 $ $ 0.000 0.00 877.76 $ -8/1/2024 Th 3 43.96$ 10.69 469 91 $ 321.45 $ $ 0.000 0.00 791.36 $ -8/1/2024 Th 4 43.48$ 10.32 448 68 $ 310.32 $ $ 0.000 0.00 759.00 $ -8/1/2024 Th 5 43.89$ 10.35 454 22 $ 311.22 $ $ 0.000 0.00 765.44 $ -8/1/2024 Th 6 44.68$ 10.74 479 84 $ 322.95 $ $ 0.000 0.00 802.79 $ -8/1/2024 Th 7 50.24$ 11.02 553 68 $ 331.37 $ $ 0.004 0.00 885.05 $ 0 21 $ 0.00 8/1/2024 Th 8 43.04$ 12.04 518.18 $ 362.04 $ $ 0.056 0.03 880.22 $ 2 68 $ (0.19) 8/1/2024 Th 9 40.45$ 13.25 535 94 $ 398.43 $ $ 0.232 0.14 934.36 $ 11.18 $ (1.14) 8/1/2024 Th 10 38.02$ 14.72 559 64 $ 442.63 $ $ 1,002.27 0.412 0.25 $ 19.82 $ (2.64) 8/1/2024 Th 11 35.48$ 16.53 586 53 $ 497.06 $ $ 1,083.59 0.548 0.34 $ 26.37 $ (4.36)8/1/2024 Th 12 40.90$ 18.84 770.47 $ 566.52 $ $ 1,336.99 0.641 0.39 $ 30.84 $ (2.97)8/1/2024 Th 13 41.31$ 21.63 893 57 $ 650.41 $ $ 1,543.98 0.689 0.42 $ 33.15 $ (3.02)8/1/2024 Th 14 43.06$ 23.8 1,024.79 $ 715.67 $ $ 1,740.46 0.696 0.43 $ 33.51 $ (2.31) 8/1/2024 Th 15 49.30$ 25.41 1,252.84 $ 764.08 $ $ 2,016.92 0.671 0.41 $ 32.29 $ 0.35 8/1/2024 Th 16 65.03$ 26.7 1,736.21 $ 802.87 $ $ 2,539.08 0.601 0.37 $ 28.93 $ 6.10 8/1/2024 Th 17 78.51$ 27.31 2,144.10 $ 821.21 $ $ 2,965.31 0.491 0.30 $ 23.64 $ 9.05 8/1/2024 Th 18 95.41$ 26.33 2,512.03 $ 791.74 $ $ 3,303.77 0.340 0.21 $ 16.37 $ 9.798/1/2024 Th 19 137.79 $ 25.17 3,468.27 $ $ 756.86 $ 4,225.13 0.155 0.10 $ 7.46 $ 8.49 8/1/2024 Th 20 197.40 $ 23.15 4,569.88 $ $ 696.12 $ 5,266.00 0.023 0.01 $ 1 09 $ 2.078/1/2024 Th 21 110.22 $ 20.7 $ 2,281.63 $ 622.45 $ 2,904.08 0.000 0.00 $ - $ - 8/1/2024 Th 22 82.50$ 18.16 1,498.27 $ 546.07 $ $ 2,044.34 0.000 0.00 $ - $ - 8/1/2024 Th 23 63.33$ 15.68 992 97 $ 471.50 $ $ 1,464.47 0.000 0.00 $ - $ -8/1/2024 Th 24 56.43$ 13.47 760.16 $ 405.04 $ $ 1,165.21 0 000 0.00 $ - $ - 3.41 $ 21.99 $ 44.06 $ 22.07 $ 17 668/2/2024 Fr 1 59.09$ 12.01 709 68 $ 361.14 $ $ 1,070.82 0.000 0.00 $ - $ - 8/2/2024 Fr 2 57.46$ 10.98 630 90 $ 330.17 $ $ 0.000 0.00 961.07 $ - $ -8/2/2024 Fr 3 48.72$ 10.36 504.70 $ 311.53 $ $ 0.000 0.00 816.22 $ - $ -8/2/2024 Fr 4 48.00$ 9.98 479 04 $ 300.10 $ $ 0.000 0.00 779.14 $ - $ -8/2/2024 Fr 5 48.37$ 9.95 481 31 $ 299.20 $ $ 0.000 0.00 780.50 $ - $ - Chart A project as proposed
8/2/2024 Fr 6 56.51$ 10.41 588 29 $ 313.03 $ 901.32 $ 0.000 0.00 - $ - $ 8/2/2024 Fr 7 57.62$ 10.68 615 38 $ 321.15 $ 936.52 $ 0.004 0.00 0.18 $ 0.02 $ 8/2/2024 Fr 8 46.21$ 11.29 521.70 $ 339.49 $ 861.19 $ 0.054 0.03 2 61 $ (0.07) $ 8/2/2024 Fr 9 45.13$ 12.44 561 39 $ 374.07 $ 935.46 $ 0.235 0.14 11.29 $ (0.48) $ 8/2/2024 Fr 10 45.00$ 13.76 619 20 $ 413.76 $ 1,032.96 $ 0.417 0.26 20.08 $ (0.89) $ 8/2/2024 Fr 11 44.59$ 15.71 700.44 $ 472.40 $ 1,172.84 $ 0.555 0.34 26.74 $ (1.32) $ 8/2/2024 Fr 12 47.86$ 17.81 852.42 $ 535.55 $ 1,387.96 $ 0.646 0.40 31.12 $ (0.24) $ 8/2/2024 Fr 13 47.95$ 20.35 975 83 $ 611.92 $ 1,587.75 $ 0.695 0.43 33.47 $ (0.22) $ 8/2/2024 Fr 14 52.83$ 23.18 1,224.50 $ 697.02 $ 1,921.52 $ 0.705 0.43 33.96 $ 1.89 $ 8/2/2024 Fr 15 59.61$ 25.38 1,512.88 $ 763.18 $ 2,276.06 $ 0.676 0.41 32.54 $ 4.62 $ 8/2/2024 Fr 16 70.56$ 26.76 1,888.08 $ 804.67 $ 2,692.76 $ 0.608 0.37 29.29 $ 8.24 $ 8/2/2024 Fr 17 83.04$ 27.46 2,280.26 $ 825.72 $ 3,105.98 $ 0.498 0.31 23.96 $ 10.55 $ 8/2/2024 Fr 18 104.75 $ 26.65 2,791.47 $ 801.37 $ 3,592.83 $ 0.344 0.21 16.58 $ 11.88 $ 8/2/2024 Fr 19 156.46 $ 25.39 3,972.51 $ 763.48 $ 4,735.99 $ 0.158 0.10 7 63 $ 10.49 $ 8/2/2024 Fr 20 237.80 $ 23.7 $ 5,635.80 $ 712.66 $ 6,348.46 0.025 0.02 $ 1.19 $ 2.87 8/2/2024 Fr 21 135.59 $ 21.42 2,904.24 $ 644.10 $ 3,548.34 $ 0.000 0.00 - $ - $ 8/2/2024 Fr 22 87.67$ 19.3 1,692.04 $ 580.35 $ 2,272.40 $ 0.000 0.00 - $ - $ 8/2/2024 Fr 23 67.16$ 16.75 1,124.92 $ 503.67 $ 1,628.59 $ 0.000 0.00 - $ - $ 8/2/2024 Fr 24 60.32$ 14.99 904 22 $ 450.75 $ 1,354.97 $ 0.000 0.00 - $ - $ 3.45 21.99 $ 49.16 $ 27.17 $ 42 21 $ 8/3/2024 Sa 1 59.32$ 13.46 798.40 $ 404.74 $ 1,203.15 $ 0.000 0.00 - $ - $ 8/3/2024 Sa 2 58.39$ 12.42 725 20 $ 373.47 $ 1,098.67 $ 0.000 0.00 - $ - $ 8/3/2024 Sa 3 52.39$ 11.69 612.41 $ 351.52 $ 963.93 $ 0.000 0.00 - $ - $ 8/3/2024 Sa 4 46.63$ 11.2 522 28 $ 336.78 $ 859.06 $ 0.000 0.00 - $ - $ 8/3/2024 Sa 5 47.51$ 11.13 528.78 $ 334.68 $ 863.46 $ 0.000 0.00 - $ - $ 8/3/2024 Sa 6 47.08$ 11.19 526 85 $ 336.48 $ 863.33 $ 0.000 0.00 - $ - $ 8/3/2024 Sa 7 46.27$ 11.26 520 95 $ 338.59 $ 859.54 $ 0.004 0.00 0.18 $ (0.01) $ 8/3/2024 Sa 8 39.33$ 11.57 455 02 $ 347.91 $ 802.93 $ 0.053 0.03 2 57 $ (0.30) $ 8/3/2024 Sa 9 36.22$ 12.31 445 88 $ 370.16 $ 816.04 $ 0.231 0.14 11.12 $ (1.73) $ 8/3/2024 Sa 10 36.20$ 13.39 484.72 $ 402.64 $ 887.35 $ 0.410 0.25 19.76 $ (3.09) $ 8/3/2024 Sa 11 38.40$ 15.27 586.41 $ 459.17 $ 1,045.58 $ 0.549 0.34 26.45 $ (3.39) $ 8/3/2024 Sa 12 39.79$ 17.86 710 57 $ 537.05 $ 1,247.62 $ 0.643 0.39 30.94 $ (3.42) $ 8/3/2024 Sa 13 41.76$ 20.36 850 21 $ 612.23 $ 1,462.43 $ 0.694 0.43 33.42 $ (2.85) $ 8/3/2024 Sa 14 45.69$ 22.86 1,044.43 $ 687.40 $ 1,731.83 $ 0.704 0.43 33.91 $ (1.20) $ 8/3/2024 Sa 15 48.84$ 24.46 1,194.73 $ 735.51 $ 1,930.24 $ 0.677 0.42 32.61 $ 0.16 $ 8/3/2024 Sa 16 59.95$ 25.4 1,522.62 $ 763.78 $ 2,286.39 $ 0.608 0.37 29.28 $ 4.28 $ 8/3/2024 Sa 17 70.00$ 25.93 1,815.10 $ 779.72 $ 2,594.82 $ 0.495 0.30 23.84 $ 6.54 $ 8/3/2024 Sa 18 81.53$ 25.63 2,089.71 $ 770.69 $ 2,860.40 $ 0.341 0.21 16.40 $ 6.91 $ 8/3/2024 Sa 19 134.21 $ 24.68 3,312.28 $ 742.13 $ 4,054.41 $ 0.154 0.09 7.41 $ 8.09 $ 8/3/2024 Sa 20 248.73 $ 23.01 5,723.38 $ 691.91 $ 6,415.30 $ 0.023 0.01 1.11 $ 2.82 $ 8/3/2024 Sa 21 107.36 $ 20.8 $ 2,233.03 $ 625.46 $ 2,858.49 0.000 0.00 $ - $ - 8/3/2024 Sa 22 74.78$ 18.71 1,399.17 $ 562.61 $ 1,961.78 $ 0.000 0.00 - $ - $ 8/3/2024 Sa 23 62.16$ 16.57 1,030.03 $ 498.26 $ 1,528.29 $ 0.000 0.00 - $ - $ 8/3/2024 Sa 24 56.65$ 14.48 820 26 $ 435.41 $ 1,255.67 $ 0.000 0.00 - $ - $ 3.43 21.99 $ 45.83 $ 23.84 $ 9 08 $ 8/4/2024 Su 1 47.76$ 12.92 617 01 $ 388.50 $ 1,005.51 $ 0.000 0.00 - $ - $ 8/4/2024 Su 2 45.38$ 11.75 533.17 $ 353.32 $ 886.49 $ 0.000 0.00 - $ - $ 8/4/2024 Su 3 42.83$ 11.02 471 97 $ 331.37 $ 803.34 $ 0.000 0.00 - $ - $ 8/4/2024 Su 4 40.95$ 10.46 428 37 $ 314.53 $ 742.91 $ 0.000 0.00 - $ - $ 8/4/2024 Su 5 40.88$ 10.19 416 57 $ 306.41 $ 722.98 $ 0.000 0.00 - $ - $ 8/4/2024 Su 6 42.81$ 10.03 429.40 $ 301.60 $ 731.00 $ 0.000 0.00 - $ - $ 8/4/2024 Su 7 39.58$ 9.91 392 27 $ 297.99 $ 690.27 $ 0.003 0.00 0.14 $ (0.02) $ 8/4/2024 Su 8 34.53$ 10.27 354 67 $ 308.82 $ 663.49 $ 0.059 0.04 2 82 $ (0.50) $ 8/4/2024 Su 9 32.20$ 11.18 359 99 $ 336.18 $ 696.18 $ 0.108 0.07 5 21 $ (1.08) $ 8/4/2024 Su 10 31.02$ 12.26 380 34 $ 368.66 $ 749.00 $ 0.262 0.16 12.63 $ (2.81) $ 8/4/2024 Su 11 32.07$ 13.92 446 38 $ 418.57 $ 864.95 $ 0.447 0.27 21.52 $ (4.49) $ 8/4/2024 Su 12 34.12$ 16.09 548 99 $ 483.83 $ 1,032.82 $ 0.641 0.39 30.88 $ (5.64) $ 8/4/2024 Su 13 36.58$ 18.36 671 69 $ 552.09 $ 1,223.77 $ 0.692 0.42 33.31 $ (5.04) $ 8/4/2024 Su 14 41.32$ 20.85 861.44 $ 626.96 $ 1,488.40 $ 0.705 0.43 33.93 $ (3.09) $ 8/4/2024 Su 15 43.42$ 22.66 983 94 $ 681.39 $ 1,665.33 $ 0.680 0.42 32.74 $ (2.10) $ 8/4/2024 Su 16 48.68$ 23.96 1,166.28 $ 720.48 $ 1,886.76 $ 0.610 0.37 29.37 $ 0.08 $ 8/4/2024 Su 17 56.43$ 24.57 1,386.40 $ 738.82 $ 2,125.22 $ 0.499 0.31 24.00 $ 2.43 $ 8/4/2024 Su 18 71.50$ 24.39 1,743.81 $ 733.41 $ 2,477.22 $ 0.344 0.21 16.56 $ 4.86 $
8/4/2024 Su 19 101.90 $ 23 2,343.79 $ 691.61 $ 3,035.40 $ 0.154 0.09 7.42 $ 5.05 $ 8/4/2024 Su 20 186.29 $ 21.03 3,917.73 $ 632.37 $ 4,550.10 $ 0.020 0.01 0 95 $ 1.66 $ 8/4/2024 Su 21 93.42$ 18.73 1,749.80 $ 563.21 $ 2,313.01 $ 0.000 0.00 - $ - $ 8/4/2024 Su 22 68.32$ 16.54 1,129.96 $ 497.36 $ 1,627.32 $ 0.000 0.00 - $ - $ 8/4/2024 Su 23 58.23$ 14.38 837 36 $ 432.41 $ 1,269.77 $ 0.000 0.00 - $ - $ 8/4/2024 Su 24 51.45$ 12.53 644 67 $ 376.78 $ 1,021.45 $ 0.000 0.00 - $ - $ 3.20 21.99 $ 37.55 $ 15.56 $ (13 33) $ 8/5/2024 Mo 1 52.65$ 11.12 585.47 $ 334.38 $ 919.85 $ 0.000 0.00 - $ - $ 8/5/2024 Mo 2 46.69$ 10.29 480.48 $ 309.42 $ 789.90 $ 0.000 0.00 - $ - $ 8/5/2024 Mo 3 44.23$ 9.73 430 34 $ 292.58 $ 722.92 $ 0.000 0.00 - $ - $ 8/5/2024 Mo 4 43.90$ 9.38 411.75 $ 282.06 $ 693.81 $ 0.000 0.00 - $ - $ 8/5/2024 Mo 5 44.13$ 9.56 421 92 $ 287.47 $ 709.39 $ 0.000 0.00 - $ - $ 8/5/2024 Mo 6 48.75$ 10.28 501.12 $ 309.12 $ 810.24 $ 0.000 0.00 - $ - $ 8/5/2024 Mo 7 52.90$ 10.48 554 39 $ 315.13 $ 869.52 $ 0.002 0.00 0.11 $ 0.01 $ 8/5/2024 Mo 8 43.91$ 11.19 491 33 $ 336.48 $ 827.81 $ 0.052 0.03 2 53 $ (0.15) $ 8/5/2024 Mo 9 42.47$ 12.14 515 53 $ 365.05 $ 880.58 $ 0.232 0.14 11.17 $ (0.85) $ 8/5/2024 Mo 10 39.92$ 13.22 527.70 $ 397.53 $ 925.23 $ 0.414 0.25 19.91 $ (2.17) $ 8/5/2024 Mo 11 40.72$ 14.58 593.74 $ 438.42 $ 1,032.16 $ 0.551 0.34 26.55 $ (2.62) $ 8/5/2024 Mo 12 41.81$ 16.34 683.19 $ 491.34 $ 1,174.53 $ 0.644 0.39 31.01 $ (2.63) $ 8/5/2024 Mo 13 45.05$ 18.52 834 32 $ 556.90 $ 1,391.22 $ 0.692 0.42 33.32 $ (1.45) $ 8/5/2024 Mo 14 51.98$ 21.19 1,101.56 $ 637.18 $ 1,738.74 $ 0.699 0.43 33.63 $ 1.51 $ 8/5/2024 Mo 15 59.13$ 23.26 1,375.26 $ 699.43 $ 2,074.69 $ 0.673 0.41 32.40 $ 4.40 $ 8/5/2024 Mo 16 64.80$ 24.66 1,598.08 $ 741.53 $ 2,339.60 $ 0.605 0.37 29.13 $ 6.06 $ 8/5/2024 Mo 17 70.43$ 25.47 1,793.78 $ 765.88 $ 2,559.66 $ 0.493 0.30 23.74 $ 6.64 $ 8/5/2024 Mo 18 98.42$ 24.71 2,431.84 $ 743.03 $ 3,174.87 $ 0.336 0.21 16.20 $ 10.30 $ 8/5/2024 Mo 19 136.15 $ 23.06 3,139.62 $ 693.41 $ 3,833.04 $ 0.150 0.09 7 21 $ 8.05 $ 8/5/2024 Mo 20 239.75 $ 20.72 4,967.53 $ 623.05 $ 5,590.58 $ 0.018 0.01 0 88 $ 2.14 $ 8/5/2024 Mo 21 115.43 $ 18.21 2,101.97 $ 547.57 $ 2,649.54 $ 0.000 0.00 - $ - $ 8/5/2024 Mo 22 78.66$ 16.15 1,270.34 $ 485.63 $ 1,755.97 $ 0.000 0.00 - $ - $ 8/5/2024 Mo 23 61.35$ 14.02 860.13 $ 421.58 $ 1,281.71 $ 0.000 0.00 - $ - $ 8/5/2024 Mo 24 55.62$ 12.15 675.76 $ 365.35 $ 1,041.11 $ 0.000 0.00 - $ - $ 3.41 21.99 $ 46.55 $ 24.56 $ 26.46 $ 8/6/2024 Tu 1 45.13$ 11.06 499.17 $ 332.57 $ 831.74 $ 0.000 0.00 - $ - $ 8/6/2024 Tu 2 42.41$ 10.32 437 68 $ 310.32 $ 748.00 $ 0.000 0.00 - $ - $ 8/6/2024 Tu 3 41.55$ 9.79 406 81 $ 294.39 $ 701.20 $ 0.000 0.00 - $ - $ 8/6/2024 Tu 4 41.62$ 9.54 397 08 $ 286.87 $ 683.95 $ 0.000 0.00 - $ - $ 8/6/2024 Tu 5 41.80$ 9.59 400 88 $ 288.37 $ 689.25 $ 0.000 0.00 - $ - $ 8/6/2024 Tu 6 45.73$ 9.98 456.40 $ 300.10 $ 756.50 $ 0.000 0.00 - $ - $ 8/6/2024 Tu 7 45.95$ 10.24 470 55 $ 307.92 $ 778.46 $ 0.002 0.00 0 07 $ (0.00) $ 8/6/2024 Tu 8 41.20$ 11.03 454.43 $ 331.67 $ 786.11 $ 0.053 0.03 2 54 $ (0.24) $ 8/6/2024 Tu 9 39.46$ 12.15 479 50 $ 365.35 $ 844.85 $ 0.229 0.14 11.01 $ (1.26) $ 8/6/2024 Tu 10 39.04$ 13.36 521 60 $ 401.74 $ 923.33 $ 0.408 0.25 19.64 $ (2.36) $ 8/6/2024 Tu 11 39.96$ 14.85 593.42 $ 446.54 $ 1,039.96 $ 0.542 0.33 26.09 $ (2.82) $ 8/6/2024 Tu 12 39.99$ 16.77 670 55 $ 504.27 $ 1,174.83 $ 0.633 0.39 30.47 $ (3.29) $ 8/6/2024 Tu 13 40.23$ 19.07 767 25 $ 573.43 $ 1,340.69 $ 0.681 0.42 32.77 $ (3.43) $ 8/6/2024 Tu 14 43.31$ 21.97 951 58 $ 660.64 $ 1,612.22 $ 0.691 0.42 33.27 $ (2.18) $ 8/6/2024 Tu 15 48.70$ 24.15 1,176.00 $ 726.19 $ 1,902.19 $ 0.662 0.41 31.86 $ 0.09 $ 8/6/2024 Tu 16 62.53$ 26.19 1,637.63 $ 787.53 $ 2,425.16 $ 0.595 0.36 28.66 $ 5.13 $ 8/6/2024 Tu 17 79.93$ 27.35 2,185.96 $ 822.41 $ 3,008.38 $ 0.486 0.30 23.39 $ 9.37 $ 8/6/2024 Tu 18 111.13 $ 27.04 3,005.04 $ 813.09 $ 3,818.14 $ 0.333 0.20 16.01 $ 12.77 $ 8/6/2024 Tu 19 193.46 $ 25.92 5,014.35 $ 779.41 $ 5,793.77 $ 0.149 0.09 7.18 $ 13.26 $ 8/6/2024 Tu 20 334.01 $ 23.63 7,892.76 $ 710.55 $ 8,603.32 $ 0.022 0.01 1 04 $ 3.80 $ 8/6/2024 Tu 21 144.22 $ 21.16 3,051.70 $ 636.28 $ 3,687.98 $ 0.000 0.00 - $ - $ 8/6/2024 Tu 22 86.05$ 18.38 1,581.64 $ 552.69 $ 2,134.33 $ 0.000 0.00 - $ - $ 8/6/2024 Tu 23 62.99$ 15.77 993 32 $ 474.20 $ 1,467.52 $ 0.000 0.00 - $ - $ 8/6/2024 Tu 24 52.17$ 13.47 702 68 $ 405.04 $ 1,107.72 $ 0.000 0.00 - $ - $ 3.36 21.99 $ 58.72 $ 36.73 $ 23 50 $ 8/7/2024 We 1 43.14$ 11.85 511 23 $ 356.33 $ 867.56 $ 0.000 0.00 - $ - $ 8/7/2024 We 2 41.45$ 11 $ 456 00 $ 330.77 $ 0.000 0.00 786.77 $ - $ - 8/7/2024 We 3 41.23$ 10.33 425 89 $ 310.62 $ 736.51 $ 0.000 0.00 - $ - $ 8/7/2024 We 4 41.01$ 10.02 410 88 $ 301.30 $ 712.18 $ 0.000 0.00 - $ - $ 8/7/2024 We 5 40.99$ 9.94 407.48 $ 298.90 $ 706.38 $ 0.000 0.00 - $ - $ 8/7/2024 We 6 41.98$ 10.37 435 29 $ 311.83 $ 747.11 $ 0.000 0.00 - $ - $ 8/7/2024 We 7 44.63$ 10.75 479.73 $ 323.25 $ 802.99 $ 0.001 0.00 0 07 $ (0.00) $
8/7/2024 We 8 40.05$ 11.62 465 33 $ 349.41 $ 814.74 $ 0.054 0.03 2 61 $ (0.28) $ 8/7/2024 We 9 36.63$ 12.81 469 24 $ 385.20 $ 854.43 $ 0.228 0.14 11.00 $ (1.66) $ 8/7/2024 We 10 36.57$ 14.34 524.48 $ 431.20 $ 955.68 $ 0.407 0.25 19.60 $ (2.97) $ 8/7/2024 We 11 37.28$ 16.4 611 39 $ 493.15 $ 1,104.53 $ 0.539 0.33 25.93 $ (3.69) $ 8/7/2024 We 12 37.43$ 18.92 708 24 $ 568.92 $ 1,277.17 $ 0.626 0.38 30.13 $ (4.23) $ 8/7/2024 We 13 38.03$ 22.06 838 86 $ 663.34 $ 1,502.21 $ 0.672 0.41 32.33 $ (4.30) $ 8/7/2024 We 14 41.62$ 24.57 1,022.66 $ 738.82 $ 1,761.48 $ 0.679 0.42 32.71 $ (2.85) $ 8/7/2024 We 15 44.97$ 26.3 1,182.67 $ 790.84 $ 1,973.52 $ 0.647 0.40 31.16 $ (1.39) $ 8/7/2024 We 16 48.71$ 27.79 1,353.68 $ 835.65 $ 2,189.33 $ 0.578 0.35 27.82 $ 0.09 $ 8/7/2024 We 17 54.37$ 28.33 1,540.36 $ 851.88 $ 2,392.24 $ 0.469 0.29 22.57 $ 1.70 $ 8/7/2024 We 18 64.12$ 27.78 1,781.20 $ 835.34 $ 2,616.55 $ 0.317 0.19 15.24 $ 3.04 $ 8/7/2024 We 19 81.91$ 26.51 2,171.38 $ 797.16 $ 2,968.54 $ 0.142 0.09 6 84 $ 2.91 $ 8/7/2024 We 20 121.26 $ 24.15 2,928.54 $ 726.19 $ 3,654.73 $ 0.023 0.01 1.13 $ 1.05 $ 8/7/2024 We 21 80.27$ 21.35 1,713.82 $ 641.99 $ 2,355.81 $ 0.000 0.00 - $ - $ 8/7/2024 We 22 63.46$ 18.57 1,178.54 $ 558.40 $ 1,736.94 $ 0.000 0.00 - $ - $ 8/7/2024 We 23 53.59$ 15.91 852 66 $ 478.41 $ 1,331.07 $ 0.000 0.00 - $ - $ 8/7/2024 We 24 45.74$ 13.75 628 93 $ 413.46 $ 1,042.39 $ 0.000 0.00 - $ - $ 3.30 21.99 $ 30.94 $ 8.95 $ (11.10) $ 8/8/2024 Th 1 42.19$ 12.2 514 67 $ 366.85 $ 881.52 $ 0.000 0.00 - $ - $ 8/8/2024 Th 2 40.19$ 11.31 454 55 $ 340.09 $ 794.64 $ 0.000 0.00 - $ - $ 8/8/2024 Th 3 37.06$ 10.64 394 29 $ 319.94 $ 714.24 $ 0.000 0.00 - $ - $ 8/8/2024 Th 4 35.23$ 10.26 361.47 $ 308.52 $ 669.99 $ 0.000 0.00 - $ - $ 8/8/2024 Th 5 36.63$ 10.17 372 51 $ 305.81 $ 678.32 $ 0.000 0.00 - $ - $ 8/8/2024 Th 6 39.28$ 10.61 416.74 $ 319.04 $ 735.79 $ 0.000 0.00 - $ - $ 8/8/2024 Th 7 39.50$ 10.99 434 09 $ 330.47 $ 764.55 $ 0.001 0.00 0 04 $ (0.00) $ 8/8/2024 Th 8 34.39$ 11.76 404.44 $ 353.62 $ 758.06 $ 0.053 0.03 2 57 $ (0.46) $ 8/8/2024 Th 9 31.41$ 12.76 400 80 $ 383.69 $ 784.49 $ 0.215 0.13 10.35 $ (2.25) $ 8/8/2024 Th 10 30.87$ 14.12 435 92 $ 424.59 $ 860.51 $ 0.386 0.24 18.57 $ (4.16) $ 8/8/2024 Th 11 30.71$ 15.65 480 54 $ 470.60 $ 951.14 $ 0.518 0.32 24.93 $ (5.64) $ 8/8/2024 Th 12 32.00$ 17.59 562 87 $ 528.93 $ 1,091.81 $ 0.606 0.37 29.17 $ (6.11) $ 8/8/2024 Th 13 34.39$ 20.21 695 02 $ 607.71 $ 1,302.74 $ 0.654 0.40 31.48 $ (5.64) $ 8/8/2024 Th 14 34.60$ 22.8 788.78 $ 685.60 $ 1,474.37 $ 0.662 0.41 31.89 $ (5.63) $ 8/8/2024 Th 15 34.86$ 25.26 880 66 $ 759.57 $ 1,640.23 $ 0.636 0.39 30.62 $ (5.30) $ 8/8/2024 Th 16 40.15$ 26.52 1,064.82 $ 797.46 $ 1,862.28 $ 0.571 0.35 27.50 $ (2.91) $ 8/8/2024 Th 17 48.47$ 27.08 1,312.47 $ 814.30 $ 2,126.76 $ 0.464 0.28 22.35 $ 0.00 $ 8/8/2024 Th 18 66.30$ 26.28 1,742.32 $ 790.24 $ 2,532.56 $ 0.315 0.19 15.19 $ 3.45 $ 8/8/2024 Th 19 65.31$ 24.93 1,628.30 $ 749.65 $ 2,377.94 $ 0.142 0.09 6 81 $ 1.46 $ 8/8/2024 Th 20 75.65$ 22.85 1,728.63 $ 687.10 $ 2,415.73 $ 0.024 0.01 1.15 $ 0.40 $ 8/8/2024 Th 21 62.18$ 20.37 1,266.57 $ 612.53 $ 1,879.10 $ 0.000 0.00 - $ - $ 8/8/2024 Th 22 56.70$ 17.91 1,015.54 $ 538.55 $ 1,554.10 $ 0.000 0.00 - $ - $ 8/8/2024 Th 23 55.63$ 15.21 846 06 $ 457.36 $ 1,303.43 $ 0.000 0.00 - $ - $ 8/8/2024 Th 24 43.94$ 13.19 579 54 $ 396.62 $ 976.16 $ 0.000 0.00 - $ - $ 3.22 21.99 $ 26.32 $ 4.33 $ (27 36) $ 8/9/2024 Fr 1 36.99$ 11.78 435 69 $ 354.22 $ 789.91 $ 0.000 0.00 - $ - $ 8/9/2024 Fr 2 34.52$ 10.89 375 93 $ 327.46 $ 703.39 $ 0.000 0.00 - $ - $ 8/9/2024 Fr 3 34.01$ 10.33 351 30 $ 310.62 $ 661.92 $ 0.000 0.00 - $ - $ 8/9/2024 Fr 4 33.78$ 9.93 335.44 $ 298.60 $ 634.03 $ 0.000 0.00 - $ - $ 8/9/2024 Fr 5 33.86$ 9.91 335 56 $ 297.99 $ 633.56 $ 0.000 0.00 - $ - $ 8/9/2024 Fr 6 37.22$ 10.31 383.76 $ 310.02 $ 693.78 $ 0.000 0.00 - $ - $ 8/9/2024 Fr 7 37.45$ 10.65 398 81 $ 320.25 $ 719.05 $ 0.000 0.00 - $ - $ 8/9/2024 Fr 8 32.18$ 11.33 364 65 $ 340.69 $ 705.34 $ 0.054 0.03 2 58 $ (0.53) $ 8/9/2024 Fr 9 30.77$ 12.5 384 69 $ 375.88 $ 760.56 $ 0.224 0.14 10.80 $ (2.43) $ 8/9/2024 Fr 10 30.17$ 13.58 409.73 $ 408.35 $ 818.09 $ 0.404 0.25 19.43 $ (4.53) $ 8/9/2024 Fr 11 30.17$ 15.24 459.72 $ 458.27 $ 917.99 $ 0.542 0.33 26.10 $ (6.08) $ 8/9/2024 Fr 12 30.43$ 17.51 532 84 $ 526.53 $ 1,059.37 $ 0.636 0.39 30.61 $ (7.03) $ 8/9/2024 Fr 13 30.94$ 19.93 616 59 $ 599.30 $ 1,215.89 $ 0.686 0.42 33.03 $ (7.37) $ 8/9/2024 Fr 14 32.31$ 22.17 716 31 $ 666.65 $ 1,382.96 $ 0.698 0.43 33.61 $ (6.91) $ 8/9/2024 Fr 15 35.20$ 23.79 837 51 $ 715.37 $ 1,552.87 $ 0.668 0.41 32.15 $ (5.43) $ 8/9/2024 Fr 16 41.21$ 24.63 1,015.01 $ 740.62 $ 1,755.64 $ 0.601 0.37 28.93 $ (2.67) $ 8/9/2024 Fr 17 43.74$ 24.69 1,079.90 $ 742.43 $ 1,822.33 $ 0.489 0.30 23.55 $ (1.42) $ 8/9/2024 Fr 18 51.57$ 23.95 1,235.13 $ 720.18 $ 1,955.30 $ 0.333 0.20 16.04 $ 0.63 $ 8/9/2024 Fr 19 63.45$ 22.67 1,438.31 $ 681.69 $ 2,120.00 $ 0.147 0.09 7 09 $ 1.35 $ 8/9/2024 Fr 20 74.05$ 20.58 1,523.98 $ 618.84 $ 2,142.82 $ 0.021 0.01 1 00 $ 0.33 $
8/9/2024 Fr 21 60.00$ 18.18 1,090.80 $ 546.67 $ 1,637.47 $ 0.000 0.00 - $ - $ 8/9/2024 Fr 22 51.90$ 16.03 831 96 $ 482.02 $ 1,313.98 $ 0.000 0.00 - $ - $ 8/9/2024 Fr 23 50.20$ 14.08 706 81 $ 423.39 $ 1,130.19 $ 0.000 0.00 - $ - $ 8/9/2024 Fr 24 44.08$ 12.3 542 22 $ 369.86 $ 912.08 $ 0.000 0.00 - $ - $ 3.37 21.99 $ 24.72 $ 2.73 $ (37 96) $ 8/10/2024 Sa 1 38.07$ 11.06 421 04 $ 332.57 $ 753.62 $ 0.000 0.00 - $ - $ 8/10/2024 Sa 2 37.60$ 10.29 386 89 $ 309.42 $ 696.31 $ 0.000 0.00 - $ - $ 8/10/2024 Sa 3 36.12$ 9.86 356 09 $ 296.49 $ 652.58 $ 0.000 0.00 - $ - $ 8/10/2024 Sa 4 36.86$ 9.52 350 93 $ 286.27 $ 637.19 $ 0.000 0.00 - $ - $ 8/10/2024 Sa 5 36.58$ 9.38 343.15 $ 282.06 $ 625.20 $ 0.000 0.00 - $ - $ 8/10/2024 Sa 6 36.43$ 9.39 342.12 $ 282.36 $ 624.47 $ 0.000 0.00 - $ - $ 8/10/2024 Sa 7 33.60$ 9.49 318 82 $ 285.36 $ 604.19 $ 0.000 0.00 - $ - $ 8/10/2024 Sa 8 28.91$ 9.79 283 05 $ 294.39 $ 577.44 $ 0.017 0.01 0 80 $ (0.20) $ 8/10/2024 Sa 9 23.95$ 10.79 258.42 $ 324.46 $ 582.88 $ 0.069 0.04 3 32 $ (1.04) $ 8/10/2024 Sa 10 26.03$ 11.87 309 01 $ 356.93 $ 665.94 $ 0.167 0.10 8 04 $ (2.30) $ 8/10/2024 Sa 11 25.75$ 13.36 344 03 $ 401.74 $ 745.77 $ 0.566 0.35 27.26 $ (7.88) $ 8/10/2024 Sa 12 27.84$ 15.4 428.79 $ 463.08 $ 891.87 $ 0.653 0.40 31.45 $ (8.26) $ 8/10/2024 Sa 13 30.00$ 17.56 526 80 $ 528.03 $ 1,054.83 $ 0.703 0.43 33.85 $ (7.96) $ 8/10/2024 Sa 14 31.62$ 19.48 616 04 $ 585.76 $ 1,201.80 $ 0.710 0.44 34.18 $ (7.33) $ 8/10/2024 Sa 15 32.15$ 20.87 670 88 $ 627.56 $ 1,298.44 $ 0.680 0.42 32.72 $ (6.80) $ 8/10/2024 Sa 16 37.18$ 21.82 811 29 $ 656.13 $ 1,467.42 $ 0.611 0.37 29.43 $ (4.23) $ 8/10/2024 Sa 17 35.73$ 22.37 799 36 $ 672.67 $ 1,472.02 $ 0.498 0.31 23.98 $ (3.89) $ 8/10/2024 Sa 18 42.81$ 22.29 954 22 $ 670.26 $ 1,624.48 $ 0.339 0.21 16.34 $ (1.18) $ 8/10/2024 Sa 19 52.08$ 21.41 1,115.04 $ 643.80 $ 1,758.84 $ 0.150 0.09 7 23 $ 0.33 $ 8/10/2024 Sa 20 61.36$ 19.58 1,201.38 $ 588.77 $ 1,790.15 $ 0.020 0.01 0 98 $ 0.16 $ 8/10/2024 Sa 21 54.46$ 17.8 969 35 $ 535.25 $ 1,504.60 $ 0.000 0.00 - $ - $ 8/10/2024 Sa 22 46.51$ 15.94 741.43 $ 479.32 $ 1,220.75 $ 0.000 0.00 - $ - $ 8/10/2024 Sa 23 46.05$ 14.22 654 90 $ 427.60 $ 1,082.50 $ 0.000 0.00 - $ - $ 8/10/2024 Sa 24 41.20$ 12.55 517 04 $ 377.38 $ 894.42 $ 0.000 0.00 - $ - $ 3.18 21.99 $ 21.86 $ (0.13) $ (47 35) $ 8/11/2024 Su 1 35.37$ 11.19 395 82 $ 336.48 $ 732.30 $ 0.000 0.00 - $ - $ 8/11/2024 Su 2 34.95$ 10.46 365 58 $ 314.53 $ 680.11 $ 0.000 0.00 - $ - $ 8/11/2024 Su 3 34.79$ 9.99 347 54 $ 300.40 $ 647.94 $ 0.000 0.00 - $ - $ 8/11/2024 Su 4 34.61$ 9.54 330.16 $ 286.87 $ 617.02 $ 0.000 0.00 - $ - $ 8/11/2024 Su 5 34.24$ 9.34 319.79 $ 280.85 $ 600.64 $ 0.000 0.00 - $ - $ 8/11/2024 Su 6 34.19$ 9.36 320 06 $ 281.46 $ 601.52 $ 0.000 0.00 - $ - $ 8/11/2024 Su 7 33.04$ 9.27 306 29 $ 278.75 $ 585.04 $ 0.000 0.00 - $ - $ 8/11/2024 Su 8 23.14$ 9.51 220.10 $ 285.97 $ 506.07 $ 0.055 0.03 2 63 $ (0.85) $ 8/11/2024 Su 9 18.79$ 10.15 190 67 $ 305.21 $ 495.88 $ 0.235 0.14 11.30 $ (4.27) $ 8/11/2024 Su 10 21.91$ 11.24 246 24 $ 337.99 $ 584.22 $ 0.420 0.26 20.23 $ (6.84) $ 8/11/2024 Su 11 21.82$ 12.52 273 22 $ 376.48 $ 649.69 $ 0.556 0.34 26.76 $ (9.08) $ 8/11/2024 Su 12 23.16$ 14.23 329 61 $ 427.90 $ 757.51 $ 0.644 0.39 30.99 $ (9.99) $ 8/11/2024 Su 13 23.21$ 16.76 389 03 $ 503.97 $ 893.00 $ 0.690 0.42 33.24 $ (10.69) $ 8/11/2024 Su 14 24.62$ 19.1 470 24 $ 574.34 $ 1,044.58 $ 0.699 0.43 33.64 $ (10.21) $ 8/11/2024 Su 15 25.17$ 20.7 521 05 $ 622.45 $ 1,143.50 $ 0.668 0.41 32.15 $ (9.54) $ 8/11/2024 Su 16 28.44$ 21.47 610 61 $ 645.60 $ 1,256.21 $ 0.598 0.37 28.81 $ (7.34) $ 8/11/2024 Su 17 30.87$ 22.16 684 08 $ 666.35 $ 1,350.43 $ 0.488 0.30 23.49 $ (5.26) $ 8/11/2024 Su 18 38.64$ 22.29 861 26 $ 670.26 $ 1,531.52 $ 0.330 0.20 15.87 $ (1.98) $ 8/11/2024 Su 19 46.07$ 21.33 982.73 $ 641.39 $ 1,624.12 $ 0.135 0.08 6.49 $ (0.20) $ 8/11/2024 Su 20 57.37$ 19.69 1,129.64 $ 592.08 $ 1,721.71 $ 0.025 0.02 1.18 $ 0.13 $ 8/11/2024 Su 21 50.00$ 17.76 888 00 $ 534.04 $ 1,422.04 $ 0.000 0.00 - $ - $ 8/11/2024 Su 22 45.10$ 15.96 719.74 $ 479.92 $ 1,199.65 $ 0.000 0.00 - $ - $ 8/11/2024 Su 23 43.95$ 13.88 610 08 $ 417.37 $ 1,027.45 $ 0.000 0.00 - $ - $ 8/11/2024 Su 24 39.72$ 12.08 479 83 $ 363.25 $ 843.08 $ 0.000 0.00 - $ - $ 3.40 21.99 $ 20.53 $ (1.46) $ (68 69) $ 8/12/2024 Mo 1 34.72$ 10.85 376.71 $ 326.26 $ 702.97 $ 0.000 0.00 - $ - $ 8/12/2024 Mo 2 33.52$ 10.11 338 91 $ 304.01 $ 642.92 $ 0.000 0.00 - $ - $ 8/12/2024 Mo 3 33.28$ 9.63 320.47 $ 289.57 $ 610.05 $ 0.000 0.00 - $ - $ 8/12/2024 Mo 4 33.23$ 9.24 307 03 $ 277.85 $ 584.88 $ 0.000 0.00 - $ - $ 8/12/2024 Mo 5 34.23$ 9.44 323 08 $ 283.86 $ 606.95 $ 0.000 0.00 - $ - $ 8/12/2024 Mo 6 38.60$ 10.25 395 63 $ 308.22 $ 703.85 $ 0.000 0.00 - $ - $ 8/12/2024 Mo 7 38.75$ 10.47 405.74 $ 314.83 $ 720.57 $ 0.000 0.00 - $ - $ 8/12/2024 Mo 8 34.33$ 11.17 383.43 $ 335.88 $ 719.31 $ 0.051 0.03 2.48 $ (0.45) $ 8/12/2024 Mo 9 30.59$ 12.39 379 01 $ 372.57 $ 751.58 $ 0.232 0.14 11.15 $ (2.54) $
8/12/2024 Mo 10 30.40$ 13.45 408 92 $ 404.44 $ 813.36 $ 0.416 0.26 20.04 $ (4.61) $ 8/12/2024 Mo 11 27.38$ 14.83 406.10 $ 445.94 $ 852.04 $ 0.557 0.34 26.82 $ (7.20) $ 8/12/2024 Mo 12 27.81$ 16.49 458 66 $ 495.85 $ 954.51 $ 0.652 0.40 31.38 $ (8.25) $ 8/12/2024 Mo 13 28.13$ 17.91 503.78 $ 538.55 $ 1,042.34 $ 0.702 0.43 33.81 $ (8.75) $ 8/12/2024 Mo 14 28.74$ 19.09 548 58 $ 574.04 $ 1,122.62 $ 0.713 0.44 34.34 $ (8.63) $ 8/12/2024 Mo 15 30.00$ 20.21 606 30 $ 607.71 $ 1,214.01 $ 0.684 0.42 32.91 $ (7.74) $ 8/12/2024 Mo 16 32.20$ 21.08 678.77 $ 633.88 $ 1,312.65 $ 0.614 0.38 29.57 $ (6.12) $ 8/12/2024 Mo 17 32.39$ 20.85 675 27 $ 626.96 $ 1,302.23 $ 0.499 0.31 24.04 $ (4.92) $ 8/12/2024 Mo 18 41.68$ 19.79 824 89 $ 595.09 $ 1,419.98 $ 0.341 0.21 16.40 $ (1.42) $ 8/12/2024 Mo 19 49.00$ 17.87 875 63 $ 537.35 $ 1,412.98 $ 0.148 0.09 7.11 $ 0.05 $ 8/12/2024 Mo 20 58.51$ 16 936.19 $ 481.12 $ 1,417.31 $ 0.018 0.01 0 89 $ 0.11 $ 8/12/2024 Mo 21 51.84$ 14.69 761 57 $ 441.73 $ 1,203.29 $ 0.000 0.00 - $ - $ 8/12/2024 Mo 22 47.73$ 13.34 636 68 $ 401.13 $ 1,037.81 $ 0.000 0.00 - $ - $ 8/12/2024 Mo 23 45.32$ 11.9 539 33 $ 357.83 $ 897.17 $ 0.000 0.00 - $ - $ 8/12/2024 Mo 24 38.61$ 10.75 415.10 $ 323.25 $ 738.35 $ 0.000 0.00 - $ - $ 3.45 21.99 $ 21.13 $ (0.86) $ (55.45) $ 8/13/2024 Tu 1 34.07$ 9.98 340 02 $ 300.10 $ 640.12 $ 0.000 0.00 - $ - $ 8/13/2024 Tu 2 32.44$ 9.58 310.78 $ 288.07 $ 598.85 $ 0.000 0.00 - $ - $ 8/13/2024 Tu 3 32.15$ 9.32 299 60 $ 280.25 $ 579.85 $ 0.000 0.00 - $ - $ 8/13/2024 Tu 4 32.33$ 9.14 295.47 $ 274.84 $ 570.31 $ 0.000 0.00 - $ - $ 8/13/2024 Tu 5 32.89$ 9.23 303 53 $ 277.55 $ 581.08 $ 0.000 0.00 - $ - $ 8/13/2024 Tu 6 34.21$ 9.73 332 88 $ 292.58 $ 625.46 $ 0.000 0.00 - $ - $ 8/13/2024 Tu 7 37.61$ 10.12 380 65 $ 304.31 $ 684.96 $ 0.000 0.00 - $ - $ 8/13/2024 Tu 8 29.72$ 10.79 320.70 $ 324.46 $ 645.15 $ 0.052 0.03 2 51 $ (0.60) $ 8/13/2024 Tu 9 25.28$ 11.66 294 81 $ 350.62 $ 645.42 $ 0.137 0.08 6 59 $ (1.95) $ 8/13/2024 Tu 10 25.94$ 12.47 323.46 $ 374.97 $ 698.43 $ 0.422 0.26 20.34 $ (5.83) $ 8/13/2024 Tu 11 22.43$ 13.55 303 99 $ 407.45 $ 711.44 $ 0.561 0.34 27.01 $ (8.95) $ 8/13/2024 Tu 12 21.72$ 14.81 321.72 $ 445.34 $ 767.05 $ 0.654 0.40 31.47 $ (10.71) $ 8/13/2024 Tu 13 22.46$ 16.69 374 88 $ 501.87 $ 876.75 $ 0.702 0.43 33.78 $ (11.19) $ 8/13/2024 Tu 14 24.81$ 17.7 439.18 $ 532.24 $ 971.41 $ 0.708 0.43 34.08 $ (10.26) $ 8/13/2024 Tu 15 26.96$ 18.9 509 62 $ 568.32 $ 1,077.95 $ 0.575 0.35 27.66 $ (7.57) $ 8/13/2024 Tu 16 31.02$ 19.54 606 20 $ 587.57 $ 1,193.77 $ 0.610 0.37 29.37 $ (6.52) $ 8/13/2024 Tu 17 30.37$ 19.88 603 69 $ 597.79 $ 1,201.48 $ 0.493 0.30 23.73 $ (5.47) $ 8/13/2024 Tu 18 37.84$ 19.26 728.77 $ 579.15 $ 1,307.91 $ 0.333 0.20 16.05 $ (2.17) $ 8/13/2024 Tu 19 48.28$ 17.83 860 87 $ 536.15 $ 1,397.02 $ 0.144 0.09 6 91 $ (0.02) $ 8/13/2024 Tu 20 57.22$ 16.19 926 37 $ 486.83 $ 1,413.20 $ 0.018 0.01 0 89 $ 0.10 $ 8/13/2024 Tu 21 51.07$ 14.93 762.44 $ 448.95 $ 1,211.38 $ 0.000 0.00 - $ - $ 8/13/2024 Tu 22 46.54$ 13.5 628 23 $ 405.95 $ 1,034.18 $ 0.000 0.00 - $ - $ 8/13/2024 Tu 23 43.80$ 12.08 529 06 $ 363.25 $ 892.30 $ 0.000 0.00 - $ - $ 8/13/2024 Tu 24 39.16$ 10.99 430 36 $ 330.47 $ 760.83 $ 0.000 0.00 - $ - $ 3.32 21.99 $ 20.58 $ (1.41) $ (64 97) $ 8/14/2024 We 1 37.32$ 10.16 379.17 $ 305.51 $ 684.68 $ 0.000 0.00 - $ - $ 8/14/2024 We 2 34.39$ 9.58 329.42 $ 288.07 $ 617.49 $ 0.000 0.00 - $ - $ 8/14/2024 We 3 31.95$ 9.31 297.43 $ 279.95 $ 577.38 $ 0.000 0.00 - $ - $ 8/14/2024 We 4 31.85$ 9.06 288 57 $ 272.43 $ 561.01 $ 0.000 0.00 - $ - $ 8/14/2024 We 5 32.04$ 9.2 294.77 $ 276.64 $ 571.42 $ 0.000 0.00 - $ - $ 8/14/2024 We 6 38.24$ 9.75 372 80 $ 293.18 $ 665.98 $ 0.000 0.00 - $ - $ 8/14/2024 We 7 41.19$ 10.13 417 28 $ 304.61 $ 721.89 $ 0.000 0.00 - $ - $ 8/14/2024 We 8 31.04$ 10.95 339 89 $ 329.27 $ 669.15 $ 0.052 0.03 2.49 $ (0.55) $ 8/14/2024 We 9 25.65$ 11.76 301 66 $ 353.62 $ 655.28 $ 0.233 0.14 11.21 $ (3.26) $ 8/14/2024 We 10 23.60$ 12.84 303 00 $ 386.10 $ 689.10 $ 0.417 0.26 20.07 $ (6.35) $ 8/14/2024 We 11 23.88$ 14.44 344 88 $ 434.21 $ 779.09 $ 0.557 0.34 26.82 $ (8.39) $ 8/14/2024 We 12 24.89$ 16.09 400 54 $ 483.83 $ 884.37 $ 0.649 0.40 31.23 $ (9.37) $ 8/14/2024 We 13 24.58$ 17.01 418.11 $ 511.49 $ 929.60 $ 0.697 0.43 33.54 $ (10.20) $ 8/14/2024 We 14 27.70$ 18 498 54 $ 541.26 $ 1,039.80 $ 0.703 0.43 33.86 $ (8.95) $ 8/14/2024 We 15 28.12$ 19.09 536 84 $ 574.04 $ 1,110.88 $ 0.670 0.41 32.23 $ (8.35) $ 8/14/2024 We 16 32.25$ 19.41 626 04 $ 583.66 $ 1,209.70 $ 0.600 0.37 28.88 $ (5.96) $ 8/14/2024 We 17 35.13$ 19.52 685.73 $ 586.97 $ 1,272.70 $ 0.486 0.30 23.39 $ (3.97) $ 8/14/2024 We 18 43.87$ 19.03 834 85 $ 572.23 $ 1,407.08 $ 0.328 0.20 15.77 $ (0.92) $ 8/14/2024 We 19 53.45$ 17.46 933 27 $ 525.02 $ 1,458.29 $ 0.141 0.09 6.77 $ 0.43 $ 8/14/2024 We 20 56.55$ 15.7 887 90 $ 472.10 $ 1,360.00 $ 0.019 0.01 0 92 $ 0.10 $ 8/14/2024 We 21 51.47$ 14.39 740 62 $ 432.71 $ 1,173.33 $ 0.000 0.00 - $ - $ 8/14/2024 We 22 43.01$ 13.08 562 52 $ 393.32 $ 955.83 $ 0.000 0.00 - $ - $
8/14/2024 We 23 40.61$ 11.76 477 52 $ 353.62 $ 831.15 $ 0.000 0.00 - $ - $ 8/14/2024 We 24 38.69$ 10.57 408 94 $ 317.84 $ 726.78 $ 0.000 0.00 - $ - $ 3.40 21.99 $ 21.65 $ (0.34) $ (59.72) $ 8/15/2024 Th 1 36.42$ 9.89 360 23 $ 297.39 $ 657.62 $ 0.000 0.00 - $ - $ 8/15/2024 Th 2 35.47$ 9.49 336 63 $ 285.36 $ 621.99 $ 0.000 0.00 - $ - $ 8/15/2024 Th 3 32.84$ 9.17 301.16 $ 275.74 $ 576.90 $ 0.000 0.00 - $ - $ 8/15/2024 Th 4 32.53$ 8.98 292 08 $ 270.03 $ 562.11 $ 0.000 0.00 - $ - $ 8/15/2024 Th 5 32.30$ 9.11 294 29 $ 273.94 $ 568.23 $ 0.000 0.00 - $ - $ 8/15/2024 Th 6 36.40$ 9.62 350 21 $ 289.27 $ 639.49 $ 0.000 0.00 - $ - $ 8/15/2024 Th 7 36.77$ 10.02 368.43 $ 301.30 $ 669.73 $ 0.000 0.00 - $ - $ 8/15/2024 Th 8 29.83$ 10.8 322.11 $ 324.76 $ 646.87 $ 0.053 0.03 2 55 $ (0.60) $ 8/15/2024 Th 9 23.45$ 11.73 275 08 $ 352.72 $ 627.80 $ 0.232 0.14 11.15 $ (3.55) $ 8/15/2024 Th 10 21.33$ 12.71 271 07 $ 382.19 $ 653.26 $ 0.416 0.25 20.01 $ (6.92) $ 8/15/2024 Th 11 22.54$ 14.04 316 52 $ 422.18 $ 738.70 $ 0.553 0.34 26.63 $ (8.79) $ 8/15/2024 Th 12 25.53$ 15.07 384.72 $ 453.15 $ 837.88 $ 0.641 0.39 30.86 $ (9.01) $ 8/15/2024 Th 13 25.36$ 16.21 411 06 $ 487.43 $ 898.50 $ 0.690 0.42 33.20 $ (9.77) $ 8/15/2024 Th 14 26.46$ 16.94 448.19 $ 509.39 $ 957.57 $ 0.696 0.43 33.49 $ (9.39) $ 8/15/2024 Th 15 28.45$ 18.1 514 92 $ 544.27 $ 1,059.19 $ 0.669 0.41 32.20 $ (8.21) $ 8/15/2024 Th 16 33.53$ 18.39 616 57 $ 552.99 $ 1,169.56 $ 0.598 0.37 28.79 $ (5.48) $ 8/15/2024 Th 17 34.37$ 18.5 635.79 $ 556.30 $ 1,192.08 $ 0.486 0.30 23.38 $ (4.20) $ 8/15/2024 Th 18 40.73$ 17.63 718 08 $ 530.13 $ 1,248.22 $ 0.325 0.20 15.63 $ (1.54) $ 8/15/2024 Th 19 54.74$ 16.54 905 32 $ 497.36 $ 1,402.68 $ 0.138 0.08 6 65 $ 0.53 $ 8/15/2024 Th 20 61.02$ 15.21 928.11 $ 457.36 $ 1,385.48 $ 0.019 0.01 0 89 $ 0.14 $ 8/15/2024 Th 21 53.12$ 14.17 752.77 $ 426.09 $ 1,178.86 $ 0.000 0.00 - $ - $ 8/15/2024 Th 22 45.88$ 13.03 597 81 $ 391.81 $ 989.63 $ 0.000 0.00 - $ - $ 8/15/2024 Th 23 41.64$ 11.75 489 27 $ 353.32 $ 842.59 $ 0.000 0.00 - $ - $ 8/15/2024 Th 24 38.82$ 10.62 412 30 $ 319.34 $ 731.64 $ 0.000 0.00 - $ - $ 3.38 21.99 $ 21.78 $ (0.21) $ (61 27) $ 8/16/2024 Fr 1 36.38$ 9.88 359.44 $ 297.09 $ 656.53 $ 0.000 0.00 - $ - $ 8/16/2024 Fr 2 33.75$ 9.37 316 20 $ 281.76 $ 597.96 $ 0.000 0.00 - $ - $ 8/16/2024 Fr 3 33.01$ 9.15 302 07 $ 275.14 $ 577.21 $ 0.000 0.00 - $ - $ 8/16/2024 Fr 4 32.68$ 8.99 293.79 $ 270.33 $ 564.12 $ 0.000 0.00 - $ - $ 8/16/2024 Fr 5 32.74$ 9.05 296 26 $ 272.13 $ 568.39 $ 0.000 0.00 - $ - $ 8/16/2024 Fr 6 36.58$ 9.49 347.15 $ 285.36 $ 632.52 $ 0.000 0.00 - $ - $ 8/16/2024 Fr 7 38.74$ 9.78 378 90 $ 294.08 $ 672.98 $ 0.000 0.00 - $ - $ 8/16/2024 Fr 8 31.74$ 10.8 342.76 $ 324.76 $ 667.52 $ 0.047 0.03 2 24 $ (0.48) $ 8/16/2024 Fr 9 25.60$ 11.88 304.17 $ 357.23 $ 661.40 $ 0.228 0.14 10.98 $ (3.20) $ 8/16/2024 Fr 10 25.43$ 12.75 324 28 $ 383.39 $ 707.67 $ 0.410 0.25 19.76 $ (5.79) $ 8/16/2024 Fr 11 25.62$ 13.8 353 55 $ 414.97 $ 768.51 $ 0.548 0.34 26.40 $ (7.68) $ 8/16/2024 Fr 12 28.14$ 15.21 427 98 $ 457.36 $ 885.34 $ 0.639 0.39 30.75 $ (7.96) $ 8/16/2024 Fr 13 28.44$ 16.87 479.75 $ 507.28 $ 987.03 $ 0.686 0.42 33.04 $ (8.42) $ 8/16/2024 Fr 14 31.63$ 18.1 572.42 $ 544.27 $ 1,116.69 $ 0.692 0.42 33.33 $ (7.15) $ 8/16/2024 Fr 15 33.56$ 18.85 632 54 $ 566.82 $ 1,199.36 $ 0.666 0.41 32.05 $ (6.08) $ 8/16/2024 Fr 16 36.88$ 19.43 716 64 $ 584.26 $ 1,300.90 $ 0.596 0.37 28.69 $ (4.23) $ 8/16/2024 Fr 17 39.09$ 19.56 764 67 $ 588.17 $ 1,352.84 $ 0.481 0.29 23.16 $ (2.76) $ 8/16/2024 Fr 18 49.13$ 18.66 916.73 $ 561.11 $ 1,477.83 $ 0.325 0.20 15.63 $ 0.13 $ 8/16/2024 Fr 19 58.35$ 17.08 996 61 $ 513.60 $ 1,510.20 $ 0.137 0.08 6 59 $ 0.83 $ 8/16/2024 Fr 20 65.21$ 15.61 1,017.98 $ 469.39 $ 1,487.37 $ 0.018 0.01 0 85 $ 0.18 $ 8/16/2024 Fr 21 56.50$ 14.3 807 90 $ 430.00 $ 1,237.90 $ 0.000 0.00 - $ - $ 8/16/2024 Fr 22 49.57$ 13.06 647 36 $ 392.71 $ 1,040.08 $ 0.000 0.00 - $ - $ 8/16/2024 Fr 23 48.12$ 11.93 574.12 $ 358.74 $ 932.86 $ 0.000 0.00 - $ - $ 8/16/2024 Fr 24 43.55$ 10.93 476 04 $ 328.67 $ 804.70 $ 0.000 0.00 - $ - $ 3.35 21.99 $ 23.24 $ 1.25 $ (47 24) $ 8/17/2024 Sa 1 40.31$ 10.2 411.19 $ 306.71 $ 717.90 $ 0.000 0.00 - $ - $ 8/17/2024 Sa 2 39.02$ 9.61 374 99 $ 288.97 $ 663.96 $ 0.000 0.00 - $ - $ 8/17/2024 Sa 3 37.28$ 9.23 344 06 $ 277.55 $ 621.61 $ 0.000 0.00 - $ - $ 8/17/2024 Sa 4 39.62$ 9.01 356 98 $ 270.93 $ 627.91 $ 0.000 0.00 - $ - $ 8/17/2024 Sa 5 36.75$ 8.97 329 69 $ 269.73 $ 599.42 $ 0.000 0.00 - $ - $ 8/17/2024 Sa 6 37.09$ 9.13 338 61 $ 274.54 $ 613.15 $ 0.000 0.00 - $ - $ 8/17/2024 Sa 7 40.23$ 9.23 371 31 $ 277.55 $ 648.86 $ 0.000 0.00 - $ - $ 8/17/2024 Sa 8 31.49$ 9.44 297 31 $ 283.86 $ 581.17 $ 0.050 0.03 2.41 $ (0.52) $ 8/17/2024 Sa 9 23.64$ 10.01 236 65 $ 301.00 $ 537.65 $ 0.230 0.14 11.06 $ (3.50) $ 8/17/2024 Sa 10 24.34$ 10.9 265 29 $ 327.76 $ 593.05 $ 0.412 0.25 19.84 $ (6.09) $ 8/17/2024 Sa 11 22.07$ 11.93 263 33 $ 358.74 $ 622.07 $ 0.505 0.31 24.30 $ (8.17) $
8/17/2024 Sa 12 24.99$ 12.57 314.12 $ 377.98 $ 692.10 $ 0.640 0.39 30.80 $ (9.20) $ 8/17/2024 Sa 13 25.11$ 13 326.40 $ 390.91 $ 717.31 $ 0.531 0.33 25.56 $ (7.60) $ 8/17/2024 Sa 14 26.19$ 13.31 348 64 $ 400.23 $ 748.87 $ 0.605 0.37 29.10 $ (8.25) $ 8/17/2024 Sa 15 27.79$ 13.76 382.44 $ 413.76 $ 796.20 $ 0.599 0.37 28.83 $ (7.59) $ 8/17/2024 Sa 16 31.43$ 14.1 443 22 $ 423.99 $ 867.21 $ 0.543 0.33 26.12 $ (5.66) $ 8/17/2024 Sa 17 32.25$ 14.57 469 91 $ 438.12 $ 908.03 $ 0.483 0.30 23.28 $ (4.80) $ 8/17/2024 Sa 18 36.64$ 14.89 545 57 $ 447.74 $ 993.31 $ 0.322 0.20 15.50 $ (2.33) $ 8/17/2024 Sa 19 45.09$ 14.48 652 85 $ 435.41 $ 1,088.26 $ 0.135 0.08 6.49 $ (0.28) $ 8/17/2024 Sa 20 52.63$ 13.68 720 02 $ 411.36 $ 1,131.38 $ 0.016 0.01 0.79 $ 0.04 $ 8/17/2024 Sa 21 46.64$ 13.05 608 65 $ 392.41 $ 1,001.07 $ 0.000 0.00 - $ - $ 8/17/2024 Sa 22 42.58$ 12.14 516 89 $ 365.05 $ 881.94 $ 0.000 0.00 - $ - $ 8/17/2024 Sa 23 40.75$ 11.14 453 94 $ 334.98 $ 788.92 $ 0.000 0.00 - $ - $ 8/17/2024 Sa 24 38.94$ 10.21 397 54 $ 307.01 $ 704.55 $ 0.000 0.00 - $ - $ 3.11 21.99 $ 20.08 $ (1.91) $ (58 24) $ 8/18/2024 Su 1 36.28$ 9.62 348 99 $ 289.27 $ 638.27 $ 0.000 0.00 - $ - $ 8/18/2024 Su 2 35.71$ 9.28 331 38 $ 279.05 $ 610.43 $ 0.000 0.00 - $ - $ 8/18/2024 Su 3 31.56$ 8.92 281 50 $ 268.22 $ 549.72 $ 0.000 0.00 - $ - $ 8/18/2024 Su 4 31.33$ 8.79 275.41 $ 264.32 $ 539.73 $ 0.000 0.00 - $ - $ 8/18/2024 Su 5 33.71$ 8.73 294 26 $ 262.51 $ 556.78 $ 0.000 0.00 - $ - $ 8/18/2024 Su 6 35.63$ 8.75 311.73 $ 263.11 $ 574.85 $ 0.000 0.00 - $ - $ 8/18/2024 Su 7 35.75$ 8.8 314 60 $ 264.62 $ 579.22 $ 0.000 0.00 - $ - $ 8/18/2024 Su 8 26.58$ 9.01 239.47 $ 270.93 $ 510.41 $ 0.049 0.03 2 36 $ (0.66) $ 8/18/2024 Su 9 21.03$ 9.5 199 80 $ 285.67 $ 485.47 $ 0.233 0.14 11.21 $ (3.92) $ 8/18/2024 Su 10 22.12$ 10.21 225 85 $ 307.01 $ 532.86 $ 0.416 0.26 20.04 $ (6.72) $ 8/18/2024 Su 11 18.15$ 10.87 197 24 $ 326.86 $ 524.10 $ 0.553 0.34 26.61 $ (10.27) $ 8/18/2024 Su 12 19.26$ 11.48 221.14 $ 345.20 $ 566.34 $ 0.645 0.40 31.03 $ (11.54) $ 8/18/2024 Su 13 21.64$ 12.06 260 97 $ 362.64 $ 623.61 $ 0.692 0.42 33.33 $ (11.38) $ 8/18/2024 Su 14 22.57$ 12.74 287 53 $ 383.09 $ 670.62 $ 0.698 0.43 33.60 $ (11.08) $ 8/18/2024 Su 15 22.85$ 13.8 315 29 $ 414.97 $ 730.26 $ 0.669 0.41 32.20 $ (10.50) $ 8/18/2024 Su 16 26.77$ 14.55 389.49 $ 437.52 $ 827.01 $ 0.599 0.37 28.82 $ (7.96) $ 8/18/2024 Su 17 28.62$ 15.04 430.46 $ 452.25 $ 882.71 $ 0.484 0.30 23.31 $ (5.89) $ 8/18/2024 Su 18 36.06$ 14.98 540 21 $ 450.45 $ 990.65 $ 0.323 0.20 15.57 $ (2.46) $ 8/18/2024 Su 19 46.86$ 14.39 674 33 $ 432.71 $ 1,107.04 $ 0.134 0.08 6.46 $ (0.13) $ 8/18/2024 Su 20 56.26$ 13.24 744 83 $ 398.13 $ 1,142.96 $ 0.016 0.01 0.76 $ 0.08 $ 8/18/2024 Su 21 50.79$ 12.78 649 04 $ 384.29 $ 1,033.34 $ 0.000 0.00 - $ - $ 8/18/2024 Su 22 47.74$ 11.74 560.48 $ 353.02 $ 913.50 $ 0.000 0.00 - $ - $ 8/18/2024 Su 23 42.01$ 10.47 439 86 $ 314.83 $ 754.69 $ 0.000 0.00 - $ - $ 8/18/2024 Su 24 37.20$ 9.57 356 03 $ 287.77 $ 643.80 $ 0.000 0.00 - $ - $ 3.38 21.99 $ 20.17 $ (1.82) $ (75 09) $ 8/19/2024 Mo 1 37.90$ 9 341 09 $ 270.63 $ 611.72 $ 0.000 0.00 - $ - $ 8/19/2024 Mo 2 34.45$ 8.51 293.13 $ 255.90 $ 549.03 $ 0.000 0.00 - $ - $ 8/19/2024 Mo 3 34.06$ 8.26 281 34 $ 248.38 $ 529.72 $ 0.000 0.00 - $ - $ 8/19/2024 Mo 4 33.74$ 8.13 274 33 $ 244.47 $ 518.80 $ 0.000 0.00 - $ - $ 8/19/2024 Mo 5 34.06$ 8.43 287.13 $ 253.49 $ 540.62 $ 0.000 0.00 - $ - $ 8/19/2024 Mo 6 39.61$ 9.25 366 39 $ 278.15 $ 644.53 $ 0.000 0.00 - $ - $ 8/19/2024 Mo 7 40.60$ 9.86 400 31 $ 296.49 $ 696.80 $ 0.000 0.00 - $ - $ 8/19/2024 Mo 8 33.49$ 10.48 350 95 $ 315.13 $ 666.08 $ 0.050 0.03 2.42 $ (0.46) $ 8/19/2024 Mo 9 29.00$ 11.14 323 01 $ 334.98 $ 657.99 $ 0.231 0.14 11.11 $ (2.75) $ 8/19/2024 Mo 10 28.59$ 11.92 340.74 $ 358.43 $ 699.18 $ 0.416 0.25 20.03 $ (5.07) $ 8/19/2024 Mo 11 27.29$ 12.63 344 62 $ 379.78 $ 724.40 $ 0.552 0.34 26.58 $ (7.17) $ 8/19/2024 Mo 12 29.25$ 13.58 397 27 $ 408.35 $ 805.62 $ 0.551 0.34 26.53 $ (6.49) $ 8/19/2024 Mo 13 29.40$ 14.81 435.40 $ 445.34 $ 880.73 $ 0.614 0.38 29.57 $ (7.18) $ 8/19/2024 Mo 14 29.83$ 15.67 467 37 $ 471.20 $ 938.57 $ 0.700 0.43 33.69 $ (8.00) $ 8/19/2024 Mo 15 30.60$ 16.38 501 22 $ 492.55 $ 993.76 $ 0.668 0.41 32.18 $ (7.32) $ 8/19/2024 Mo 16 34.58$ 17.16 593.42 $ 516.00 $ 1,109.42 $ 0.598 0.37 28.76 $ (5.08) $ 8/19/2024 Mo 17 36.79$ 17.44 641 57 $ 524.42 $ 1,165.99 $ 0.431 0.26 20.75 $ (3.09) $ 8/19/2024 Mo 18 40.00$ 17.13 685 20 $ 515.10 $ 1,200.30 $ 0.287 0.18 13.83 $ (1.49) $ 8/19/2024 Mo 19 50.60$ 16.03 811.13 $ 482.02 $ 1,293.15 $ 0.134 0.08 6.47 $ 0.18 $ 8/19/2024 Mo 20 65.09$ 14.63 952 23 $ 439.92 $ 1,392.16 $ 0.017 0.01 0 80 $ 0.17 $ 8/19/2024 Mo 21 58.24$ 13.7 797 95 $ 411.96 $ 1,209.91 $ 0.000 0.00 - $ - $ 8/19/2024 Mo 22 41.78$ 12.47 521 00 $ 374.97 $ 895.97 $ 0.000 0.00 - $ - $ 8/19/2024 Mo 23 44.85$ 11.26 505 02 $ 338.59 $ 843.60 $ 0.000 0.00 - $ - $ 8/19/2024 Mo 24 39.14$ 10.04 392 97 $ 301.90 $ 694.87 $ 0.000 0.00 - $ - $ 3.22 21.99 $ 21.89 $ (0.10) $ (48 92) $
8/20/2024 Tu 1 37.21$ 9.29 345.70 $ 279.35 $ 625.05 $ 0.000 0.00 - $ - $ 8/20/2024 Tu 2 34.24$ 8.88 304 08 $ 267.02 $ 571.10 $ 0.000 0.00 - $ - $ 8/20/2024 Tu 3 33.63$ 8.62 289 90 $ 259.20 $ 549.10 $ 0.000 0.00 - $ - $ 8/20/2024 Tu 4 33.18$ 8.51 282 39 $ 255.90 $ 538.28 $ 0.000 0.00 - $ - $ 8/20/2024 Tu 5 33.15$ 8.73 289 38 $ 262.51 $ 551.89 $ 0.000 0.00 - $ - $ 8/20/2024 Tu 6 34.16$ 9.19 313 93 $ 276.34 $ 590.27 $ 0.000 0.00 - $ - $ 8/20/2024 Tu 7 38.49$ 9.9 381 09 $ 297.69 $ 678.79 $ 0.000 0.00 - $ - $ 8/20/2024 Tu 8 31.82$ 10.45 332.47 $ 314.23 $ 646.70 $ 0.052 0.03 2.49 $ (0.53) $ 8/20/2024 Tu 9 26.94$ 11.17 300 87 $ 335.88 $ 636.75 $ 0.231 0.14 11.11 $ (3.05) $ 8/20/2024 Tu 10 25.96$ 12.12 314 59 $ 364.45 $ 679.03 $ 0.419 0.26 20.19 $ (5.79) $ 8/20/2024 Tu 11 25.00$ 13.07 326.75 $ 393.01 $ 719.76 $ 0.560 0.34 26.98 $ (8.06) $ 8/20/2024 Tu 12 27.94$ 14.18 396 20 $ 426.39 $ 822.59 $ 0.656 0.40 31.59 $ (8.25) $ 8/20/2024 Tu 13 27.93$ 15.57 434 86 $ 468.19 $ 903.05 $ 0.706 0.43 33.97 $ (8.88) $ 8/20/2024 Tu 14 28.73$ 17.14 492 35 $ 515.40 $ 1,007.75 $ 0.710 0.44 34.20 $ (8.60) $ 8/20/2024 Tu 15 31.04$ 18.02 559 35 $ 541.86 $ 1,101.21 $ 0.681 0.42 32.77 $ (7.27) $ 8/20/2024 Tu 16 34.67$ 19 658 82 $ 571.33 $ 1,230.15 $ 0.606 0.37 29.19 $ (5.13) $ 8/20/2024 Tu 17 35.14$ 19.23 675 83 $ 578.25 $ 1,254.08 $ 0.489 0.30 23.55 $ (3.99) $ 8/20/2024 Tu 18 35.96$ 18.61 669.18 $ 559.60 $ 1,228.78 $ 0.326 0.20 15.68 $ (2.50) $ 8/20/2024 Tu 19 47.27$ 17.14 810 21 $ 515.40 $ 1,325.61 $ 0.133 0.08 6.40 $ (0.10) $ 8/20/2024 Tu 20 63.73$ 15.67 998 64 $ 471.20 $ 1,469.84 $ 0.015 0.01 0.71 $ 0.14 $ 8/20/2024 Tu 21 49.83$ 14.75 735 03 $ 443.53 $ 1,178.57 $ 0.000 0.00 - $ - $ 8/20/2024 Tu 22 40.15$ 13.16 528 36 $ 395.72 $ 924.08 $ 0.000 0.00 - $ - $ 8/20/2024 Tu 23 41.02$ 11.75 481 99 $ 353.32 $ 835.31 $ 0.000 0.00 - $ - $ 8/20/2024 Tu 24 37.34$ 10.41 388.71 $ 313.03 $ 701.74 $ 0.000 0.00 - $ - $ 3.42 21.99 $ 21.17 $ (0.82) $ (57 21) $ 8/21/2024 We 1 35.69$ 9.62 343 35 $ 289.27 $ 632.62 $ 0.000 0.00 - $ - $ 8/21/2024 We 2 32.92$ 9.11 299 92 $ 273.94 $ 573.86 $ 0.000 0.00 - $ - $ 8/21/2024 We 3 32.87$ 8.87 291 59 $ 266.72 $ 558.31 $ 0.000 0.00 - $ - $ 8/21/2024 We 4 31.42$ 8.7 273 39 $ 261.61 $ 535.00 $ 0.000 0.00 - $ - $ 8/21/2024 We 5 31.41$ 8.83 277 36 $ 265.52 $ 542.88 $ 0.000 0.00 - $ - $ 8/21/2024 We 6 36.62$ 9.37 343.12 $ 281.76 $ 624.88 $ 0.000 0.00 - $ - $ 8/21/2024 We 7 38.02$ 9.93 377 59 $ 298.60 $ 676.18 $ 0.000 0.00 - $ - $ 8/21/2024 We 8 31.17$ 10.66 332 30 $ 320.55 $ 652.84 $ 0.050 0.03 2.42 $ (0.53) $ 8/21/2024 We 9 26.53$ 11.17 296 37 $ 335.88 $ 632.26 $ 0.225 0.14 10.81 $ (3.02) $ 8/21/2024 We 10 26.29$ 11.78 309.70 $ 354.22 $ 663.93 $ 0.408 0.25 19.62 $ (5.54) $ 8/21/2024 We 11 24.88$ 12.62 313 93 $ 379.48 $ 693.41 $ 0.548 0.34 26.39 $ (7.93) $ 8/21/2024 We 12 26.16$ 13.93 364 35 $ 418.88 $ 783.23 $ 0.639 0.39 30.77 $ (8.74) $ 8/21/2024 We 13 27.14$ 15.1 409.75 $ 454.06 $ 863.81 $ 0.687 0.42 33.08 $ (8.98) $ 8/21/2024 We 14 28.20$ 16.35 461 08 $ 491.64 $ 952.73 $ 0.696 0.43 33.50 $ (8.64) $ 8/21/2024 We 15 30.00$ 17.74 532 20 $ 533.44 $ 1,065.64 $ 0.670 0.41 32.23 $ (7.58) $ 8/21/2024 We 16 31.97$ 18.23 582 82 $ 548.18 $ 1,131.00 $ 0.598 0.37 28.77 $ (6.04) $ 8/21/2024 We 17 33.94$ 18.52 628 62 $ 556.90 $ 1,185.51 $ 0.480 0.29 23.13 $ (4.28) $ 8/21/2024 We 18 35.37$ 17.75 627 82 $ 533.74 $ 1,161.56 $ 0.319 0.20 15.34 $ (2.56) $ 8/21/2024 We 19 49.68$ 16.67 828.18 $ 501.27 $ 1,329.44 $ 0.128 0.08 6.14 $ 0.10 $ 8/21/2024 We 20 61.19$ 15.28 935 00 $ 459.47 $ 1,394.47 $ 0.012 0.01 0 59 $ 0.10 $ 8/21/2024 We 21 50.19$ 14.22 713.75 $ 427.60 $ 1,141.35 $ 0.000 0.00 - $ - $ 8/21/2024 We 22 37.82$ 12.68 479 57 $ 381.29 $ 860.86 $ 0.000 0.00 - $ - $ 8/21/2024 We 23 38.06$ 11.38 433.17 $ 342.20 $ 775.37 $ 0.000 0.00 - $ - $ 8/21/2024 We 24 37.53$ 10.12 379 82 $ 304.31 $ 684.13 $ 0.000 0.00 - $ - $ 3.35 21.99 $ 21.03 $ (0.96) $ (58 68) $ 8/22/2024 Th 1 37.54$ 9.38 352.10 $ 282.06 $ 634.16 $ 0.000 0.00 - $ - $ 8/22/2024 Th 2 37.16$ 9 334.40 $ 270.63 $ 605.03 $ 0.000 0.00 - $ - $ 8/22/2024 Th 3 36.50$ 8.81 321 59 $ 264.92 $ 586.50 $ 0.000 0.00 - $ - $ 8/22/2024 Th 4 36.22$ 8.62 312.19 $ 259.20 $ 571.40 $ 0.000 0.00 - $ - $ 8/22/2024 Th 5 36.47$ 8.79 320 60 $ 264.32 $ 584.91 $ 0.000 0.00 - $ - $ 8/22/2024 Th 6 38.58$ 9.35 360.70 $ 281.15 $ 641.85 $ 0.000 0.00 - $ - $ 8/22/2024 Th 7 36.81$ 10.1 371 83 $ 303.71 $ 675.53 $ 0.000 0.00 - $ - $ 8/22/2024 Th 8 31.93$ 10.83 345.75 $ 325.66 $ 671.41 $ 0.042 0.03 2 03 $ (0.43) $ 8/22/2024 Th 9 26.91$ 11.48 308 96 $ 345.20 $ 654.16 $ 0.122 0.07 5 88 $ (1.61) $ 8/22/2024 Th 10 26.53$ 12.01 318 66 $ 361.14 $ 679.80 $ 0.143 0.09 6 87 $ (1.92) $ 8/22/2024 Th 11 24.72$ 12.38 306 06 $ 372.27 $ 678.33 $ 0.270 0.17 13.02 $ (3.94) $ 8/22/2024 Th 12 24.60$ 12.92 317 81 $ 388.50 $ 706.31 $ 0.511 0.31 24.61 $ (7.48) $ 8/22/2024 Th 13 24.34$ 13.39 325 92 $ 402.64 $ 728.56 $ 0.562 0.34 27.08 $ (8.32) $
8/22/2024 Th 14 24.45$ 13.88 339 37 $ 417.37 $ 756.75 $ 0.542 0.33 26.09 $ (7.98) $ 8/22/2024 Th 15 25.28$ 14.51 366.79 $ 436.32 $ 803.10 $ 0.689 0.42 33.18 $ (9.80) $ 8/22/2024 Th 16 25.53$ 14.83 378 59 $ 445.94 $ 824.53 $ 0.612 0.38 29.48 $ (8.61) $ 8/22/2024 Th 17 27.47$ 15.1 414.73 $ 454.06 $ 868.79 $ 0.493 0.30 23.75 $ (6.35) $ 8/22/2024 Th 18 32.43$ 14.83 481 01 $ 445.94 $ 926.95 $ 0.327 0.20 15.73 $ (3.21) $ 8/22/2024 Th 19 38.91$ 13.69 532.71 $ 411.66 $ 944.37 $ 0.129 0.08 6 22 $ (0.76) $ 8/22/2024 Th 20 49.84$ 12.94 644 90 $ 389.11 $ 1,034.01 $ 0.011 0.01 0 52 $ 0.01 $ 8/22/2024 Th 21 48.47$ 12.57 609 31 $ 377.98 $ 987.29 $ 0.000 0.00 - $ - $ 8/22/2024 Th 22 39.55$ 11.53 456 03 $ 346.71 $ 802.74 $ 0.000 0.00 - $ - $ 8/22/2024 Th 23 40.00$ 10.43 417.18 $ 313.63 $ 730.81 $ 0.000 0.00 - $ - $ 8/22/2024 Th 24 39.23$ 9.5 $ 372.71 $ 285.67 $ 0.000 0.00 658.38 $ - $ - 2.73 $ 21.99 $ 18.83 $ (3.16) $ (54 68) 8/23/2024 Fr 1 33.26$ 8.95 297 64 $ 269.13 $ 566.76 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 2 32.66$ 8.66 282 86 $ 260.41 $ 543.27 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 3 31.76$ 8.56 271 85 $ 257.40 $ 529.25 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 4 30.54$ 8.5 259 55 $ 255.60 $ 515.15 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 5 30.52$ 8.67 264 59 $ 260.71 $ 525.30 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 6 34.27$ 9.12 312 55 $ 274.24 $ 586.79 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 7 35.39$ 9.72 344 03 $ 292.28 $ 636.31 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 8 30.01$ 10.38 311 54 $ 312.13 $ 623.66 $ 0.016 0.01 0.77 $ (0.18) $ 8/23/2024 Fr 9 21.51$ 10.82 232.79 $ 325.36 $ 558.15 $ 0.092 0.06 4.43 $ (1.52) $ 8/23/2024 Fr 10 21.57$ 11.15 240.49 $ 335.28 $ 575.77 $ 0.209 0.13 10.08 $ (3.45) $ 8/23/2024 Fr 11 19.53$ 11.79 230 27 $ 354.53 $ 584.80 $ 0.283 0.17 13.63 $ (5.02) $ 8/23/2024 Fr 12 19.22$ 12.77 245.41 $ 383.99 $ 629.40 $ 0.498 0.31 23.99 $ (8.93) $ 8/23/2024 Fr 13 18.03$ 12.8 230.79 $ 384.90 $ 615.69 $ 0.558 0.34 26.86 $ (10.41) $ 8/23/2024 Fr 14 20.12$ 12.87 258 90 $ 387.00 $ 645.90 $ 0.497 0.30 23.92 $ (8.63) $ 8/23/2024 Fr 15 21.78$ 12.64 275 30 $ 380.08 $ 655.38 $ 0.515 0.32 24.77 $ (8.42) $ 8/23/2024 Fr 16 21.93$ 12.56 275.46 $ 377.68 $ 653.14 $ 0.376 0.23 18.10 $ (6.12) $ 8/23/2024 Fr 17 23.73$ 12.56 298 05 $ 377.68 $ 675.73 $ 0.380 0.23 18.27 $ (5.75) $ 8/23/2024 Fr 18 29.33$ 12.34 361 87 $ 371.06 $ 732.93 $ 0.167 0.10 8 04 $ (1.96) $ 8/23/2024 Fr 19 37.45$ 11.93 446.74 $ 358.74 $ 805.48 $ 0.093 0.06 4.49 $ (0.63) $ 8/23/2024 Fr 20 39.10$ 11.83 462 51 $ 355.73 $ 818.23 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 21 37.77$ 11.62 438 89 $ 349.41 $ 788.31 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 22 37.10$ 10.88 403 68 $ 327.16 $ 730.84 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 23 36.48$ 10.09 368 09 $ 303.41 $ 671.50 $ 0.000 0.00 - $ - $ 8/23/2024 Fr 24 36.56$ 9.33 341.13 $ 280.55 $ 621.69 $ 0.000 0.00 - $ - $ 2.26 21.99 $ 17.49 $ (4.50) $ (52 96) $ 8/24/2024 Sa 1 30.69$ 8.64 265.12 $ 259.80 $ 524.93 $ 0.000 0.00 - $ - $ 8/24/2024 Sa 2 31.11$ 8.46 263.17 $ 254.39 $ 517.56 $ 0.000 0.00 - $ - $ 8/24/2024 Sa 3 29.52$ 8.33 245 88 $ 250.48 $ 496.37 $ 0.000 0.00 - $ - $ 8/24/2024 Sa 4 28.73$ 8.28 237 92 $ 248.98 $ 486.90 $ 0.000 0.00 - $ - $ 8/24/2024 Sa 5 30.11$ 8.41 253 25 $ 252.89 $ 506.14 $ 0.000 0.00 - $ - $ 8/24/2024 Sa 6 29.92$ 8.65 258 81 $ 260.11 $ 518.92 $ 0.000 0.00 - $ - $ 8/24/2024 Sa 7 28.64$ 9 257.74 $ 270.63 $ 528.37 $ 0.000 0.00 - $ - $ 8/24/2024 Sa 8 10.14$ 9.35 94 81 $ 281.15 $ 375.97 $ 0.049 0.03 2 35 $ (1.15) $ 8/24/2024 Sa 9 4.05$ 10.09 40 85 $ 303.41 $ 344.25 $ 0.232 0.14 11.18 $ (6.32) $ 8/24/2024 Sa 10 8.50$ 10.39 88 29 $ 312.43 $ 400.71 $ 0.420 0.26 20.23 $ (10.29) $ 8/24/2024 Sa 11 4.99$ 10.99 54 84 $ 330.47 $ 385.31 $ 0.558 0.34 26.84 $ (14.86) $ 8/24/2024 Sa 12 3.21$ 11.63 37 31 $ 349.71 $ 387.02 $ 0.653 0.40 31.45 $ (18.12) $ 8/24/2024 Sa 13 1.99$ 11.13 22.17 $ 334.68 $ 356.85 $ 0.701 0.43 33.75 $ (19.97) $ 8/24/2024 Sa 14 1.52$ 11.47 17.48 $ 344.90 $ 362.39 $ 0.706 0.43 33.97 $ (20.30) $ 8/24/2024 Sa 15 1.72$ 11.25 19.40 $ 338.29 $ 357.69 $ 0.672 0.41 32.37 $ (19.27) $ 8/24/2024 Sa 16 1.49$ 11.96 17.77 $ 359.64 $ 377.41 $ 0.599 0.37 28.86 $ (17.26) $ 8/24/2024 Sa 17 5.73$ 11.88 68.12 $ 357.23 $ 425.35 $ 0.480 0.29 23.12 $ (12.58) $ 8/24/2024 Sa 18 20.24$ 11.8 238.79 $ 354.83 $ 593.62 $ 0.316 0.19 15.23 $ (5.47) $ 8/24/2024 Sa 19 29.49$ 11.84 349.11 $ 356.03 $ 705.14 $ 0.124 0.08 5 99 $ (1.45) $ 8/24/2024 Sa 20 32.99$ 11.46 378 02 $ 344.60 $ 722.63 $ 0.011 0.01 0 52 $ (0.10) $ 8/24/2024 Sa 21 32.27$ 11.44 369.19 $ 344.00 $ 713.19 $ 0.000 0.00 - $ - $ 8/24/2024 Sa 22 30.84$ 10.82 333.70 $ 325.36 $ 659.06 $ 0.000 0.00 - $ - $ 8/24/2024 Sa 23 29.87$ 10.07 300.74 $ 302.80 $ 603.55 $ 0.000 0.00 - $ - $ 8/24/2024 Sa 24 29.19$ 9.18 267 93 $ 276.04 $ 543.97 $ 0.000 0.00 - $ - $ 3.39 21.99 $ 14.61 $ (7.38) $ (133.45) $ 8/25/2024 Su 1 26.48$ 8.54 226.12 $ 256.80 $ 482.92 $ 0.000 0.00 - $ - $ 8/25/2024 Su 2 26.67$ 8.19 218.44 $ 246.27 $ 464.71 $ 0.000 0.00 - $ - $
8/25/2024 Su 3 26.39$ 8.03 211 95 $ 241.46 $ 453.41 $ 0.000 0.00 - $ - $ 8/25/2024 Su 4 26.25$ 7.88 206 81 $ 236.95 $ 443.76 $ 0.000 0.00 - $ - $ 8/25/2024 Su 5 26.23$ 8.05 211.18 $ 242.06 $ 453.25 $ 0.000 0.00 - $ - $ 8/25/2024 Su 6 25.92$ 8.16 211 53 $ 245.37 $ 456.90 $ 0.000 0.00 - $ - $ 8/25/2024 Su 7 26.33$ 8.32 219 06 $ 250.18 $ 469.25 $ 0.000 0.00 - $ - $ 8/25/2024 Su 8 10.98$ 8.57 94.10 $ 257.70 $ 351.80 $ 0.048 0.03 2 29 $ (1.09) $ 8/25/2024 Su 9 6.25$ 8.9 55 64 $ 267.62 $ 323.26 $ 0.230 0.14 11.07 $ (5.95) $ 8/25/2024 Su 10 5.66$ 9.5 $ 53.78 $ 285.67 $ 0.416 0.26 339.44 $ 20.03 $ (10.92) 8/25/2024 Su 11 3.86$ 9.69 37 37 $ 291.38 $ 328.75 $ 0.555 0.34 26.72 $ (15.18) $ 8/25/2024 Su 12 4.87$ 10.23 49 80 $ 307.62 $ 357.42 $ 0.649 0.40 31.23 $ (17.33) $ 8/25/2024 Su 13 4.88$ 10.82 52 81 $ 325.36 $ 378.17 $ 0.696 0.43 33.52 $ (18.60) $ 8/25/2024 Su 14 6.65$ 11.63 77 38 $ 349.71 $ 427.10 $ 0.705 0.43 33.92 $ (18.06) $ 8/25/2024 Su 15 12.45$ 12.56 156.42 $ 377.68 $ 534.10 $ 0.671 0.41 32.32 $ (14.82) $ 8/25/2024 Su 16 15.00$ 13.57 203 55 $ 408.05 $ 611.60 $ 0.598 0.37 28.77 $ (12.26) $ 8/25/2024 Su 17 23.46$ 14.35 336 58 $ 431.50 $ 768.08 $ 0.479 0.29 23.05 $ (7.34) $ 8/25/2024 Su 18 30.00$ 14.47 434.10 $ 435.11 $ 869.21 $ 0.314 0.19 15.11 $ (3.55) $ 8/25/2024 Su 19 39.13$ 14.24 557 25 $ 428.20 $ 985.44 $ 0.122 0.07 5 89 $ (0.70) $ 8/25/2024 Su 20 43.00$ 13.53 581.75 $ 406.85 $ 988.60 $ 0.009 0.01 0.44 $ (0.03) $ 8/25/2024 Su 21 39.45$ 13.11 517.16 $ 394.22 $ 911.38 $ 0.000 0.00 - $ - $ 8/25/2024 Su 22 37.32$ 11.8 440.40 $ 354.83 $ 795.22 $ 0.000 0.00 - $ - $ 8/25/2024 Su 23 36.64$ 10.43 382.14 $ 313.63 $ 695.77 $ 0.000 0.00 - $ - $ 8/25/2024 Su 24 35.01$ 9.32 326 32 $ 280.25 $ 606.57 $ 0.000 0.00 - $ - $ 3.37 21.99 $ 17.91 $ (4.08) $ (112 93) $ 8/26/2024 Mo 1 34.67$ 8.71 301 94 $ 261.91 $ 563.85 $ 0.000 0.00 - $ - $ 8/26/2024 Mo 2 34.21$ 8.37 286 32 $ 251.69 $ 538.01 $ 0.000 0.00 - $ - $ 8/26/2024 Mo 3 34.31$ 8.15 279 67 $ 245.07 $ 524.74 $ 0.000 0.00 - $ - $ 8/26/2024 Mo 4 32.49$ 8.05 261 53 $ 242.06 $ 503.59 $ 0.000 0.00 - $ - $ 8/26/2024 Mo 5 35.47$ 8.27 293 32 $ 248.68 $ 542.00 $ 0.000 0.00 - $ - $ 8/26/2024 Mo 6 36.78$ 9.09 334 37 $ 273.34 $ 607.71 $ 0.000 0.00 - $ - $ 8/26/2024 Mo 7 37.11$ 9.84 365 20 $ 295.89 $ 661.09 $ 0.000 0.00 - $ - $ 8/26/2024 Mo 8 29.27$ 10.4 304.40 $ 312.73 $ 617.13 $ 0.047 0.03 2 27 $ (0.56) $ 8/26/2024 Mo 9 24.53$ 11.06 271 32 $ 332.57 $ 603.89 $ 0.228 0.14 10.98 $ (3.35) $ 8/26/2024 Mo 10 22.03$ 11.84 260 89 $ 356.03 $ 616.92 $ 0.413 0.25 19.89 $ (6.69) $ 8/26/2024 Mo 11 22.17$ 12.75 282 65 $ 383.39 $ 666.04 $ 0.550 0.34 26.46 $ (8.86) $ 8/26/2024 Mo 12 23.93$ 13.81 330 54 $ 415.27 $ 745.80 $ 0.639 0.39 30.78 $ (9.61) $ 8/26/2024 Mo 13 24.24$ 15.51 375 99 $ 466.39 $ 842.37 $ 0.686 0.42 33.02 $ (10.18) $ 8/26/2024 Mo 14 25.85$ 17 439.49 $ 511.19 $ 950.68 $ 0.690 0.42 33.21 $ (9.56) $ 8/26/2024 Mo 15 26.86$ 18.59 499 33 $ 559.00 $ 1,058.33 $ 0.657 0.40 31.61 $ (8.70) $ 8/26/2024 Mo 16 32.49$ 19.9 646.46 $ 598.39 $ 1,244.85 $ 0.585 0.36 28.18 $ (5.73) $ 8/26/2024 Mo 17 32.49$ 20.82 676.46 $ 626.06 $ 1,302.52 $ 0.468 0.29 22.55 $ (4.59) $ 8/26/2024 Mo 18 43.94$ 20.54 902 63 $ 617.64 $ 1,520.26 $ 0.308 0.19 14.82 $ (0.85) $ 8/26/2024 Mo 19 56.04$ 19.53 1,094.54 $ 587.27 $ 1,681.81 $ 0.118 0.07 5 68 $ 0.55 $ 8/26/2024 Mo 20 68.58$ 17.84 1,223.43 $ 536.45 $ 1,759.88 $ 0.008 0.01 0.40 $ 0.10 $ 8/26/2024 Mo 21 49.59$ 16.48 817 23 $ 495.55 $ 1,312.78 $ 0.000 0.00 - $ - $ 8/26/2024 Mo 22 40.36$ 14.35 579.16 $ 431.50 $ 1,010.66 $ 0.000 0.00 - $ - $ 8/26/2024 Mo 23 38.04$ 12.56 477 84 $ 377.68 $ 855.52 $ 0.000 0.00 - $ - $ 8/26/2024 Mo 24 36.73$ 10.99 403.70 $ 330.47 $ 734.17 $ 0.000 0.00 - $ - $ 3.31 21.99 $ 22.49 $ 0.50 $ (61 30) $ 8/27/2024 Tu 1 33.85$ 9.96 337.19 $ 299.50 $ 636.69 $ 0.000 0.00 - $ - $ 8/27/2024 Tu 2 34.30$ 9.46 324.49 $ 284.46 $ 608.96 $ 0.000 0.00 - $ - $ 8/27/2024 Tu 3 32.57$ 9.09 296 06 $ 273.34 $ 569.39 $ 0.000 0.00 - $ - $ 8/27/2024 Tu 4 32.33$ 8.95 289 36 $ 269.13 $ 558.48 $ 0.000 0.00 - $ - $ 8/27/2024 Tu 5 32.98$ 9.12 300.75 $ 274.24 $ 574.99 $ 0.000 0.00 - $ - $ 8/27/2024 Tu 6 34.35$ 9.51 326 64 $ 285.97 $ 612.60 $ 0.000 0.00 - $ - $ 8/27/2024 Tu 7 36.38$ 10.29 374 32 $ 309.42 $ 683.74 $ 0.000 0.00 - $ - $ 8/27/2024 Tu 8 27.43$ 10.91 299 26 $ 328.06 $ 627.32 $ 0.046 0.03 2 21 $ (0.59) $ 8/27/2024 Tu 9 23.64$ 11.81 279 24 $ 355.13 $ 634.37 $ 0.229 0.14 11.02 $ (3.48) $ 8/27/2024 Tu 10 23.03$ 12.77 294.16 $ 383.99 $ 678.15 $ 0.414 0.25 19.94 $ (6.46) $ 8/27/2024 Tu 11 22.85$ 14.1 322.15 $ 423.99 $ 746.13 $ 0.551 0.34 26.53 $ (8.65) $ 8/27/2024 Tu 12 23.84$ 15.63 372 59 $ 469.99 $ 842.58 $ 0.639 0.39 30.75 $ (9.64) $ 8/27/2024 Tu 13 24.49$ 17.68 433 01 $ 531.64 $ 964.65 $ 0.685 0.42 32.97 $ (10.07) $ 8/27/2024 Tu 14 26.29$ 19.79 520 31 $ 595.09 $ 1,115.40 $ 0.692 0.42 33.34 $ (9.41) $ 8/27/2024 Tu 15 31.15$ 21.55 671 35 $ 648.01 $ 1,319.36 $ 0.659 0.40 31.71 $ (6.99) $
8/27/2024 Tu 16 36.44$ 23.52 856 98 $ 707.25 $ 1,564.23 $ 0.587 0.36 28.24 $ (4.32) $ 8/27/2024 Tu 17 38.47$ 24.24 932 58 $ 728.90 $ 1,661.47 $ 0.469 0.29 22.57 $ (2.87) $ 8/27/2024 Tu 18 51.83$ 23.54 1,220.02 $ 707.85 $ 1,927.87 $ 0.308 0.19 14.82 $ 0.63 $ 8/27/2024 Tu 19 75.96$ 22.29 1,693.22 $ 670.26 $ 2,363.48 $ 0.118 0.07 5 66 $ 1.98 $ 8/27/2024 Tu 20 81.91$ 20.12 1,648.00 $ 605.01 $ 2,253.01 $ 0.008 0.01 0.40 $ 0.17 $ 8/27/2024 Tu 21 53.63$ 17.98 964 24 $ 540.66 $ 1,504.90 $ 0.000 0.00 - $ - $ 8/27/2024 Tu 22 45.10$ 15.66 706 25 $ 470.90 $ 1,177.15 $ 0.000 0.00 - $ - $ 8/27/2024 Tu 23 40.37$ 13.5 544 99 $ 405.95 $ 950.93 $ 0.000 0.00 - $ - $ 8/27/2024 Tu 24 34.62$ 11.75 406.77 $ 353.32 $ 760.09 $ 0.000 0.00 - $ - $ 3.31 21.99 $ 25.79 $ 3.80 $ (53.17) $ 8/28/2024 We 1 35.30$ 10.45 368 84 $ 314.23 $ 683.08 $ 0.000 0.00 - $ - $ 8/28/2024 We 2 33.77$ 9.83 331 91 $ 295.59 $ 627.50 $ 0.000 0.00 - $ - $ 8/28/2024 We 3 32.67$ 9.38 306.45 $ 282.06 $ 588.50 $ 0.000 0.00 - $ - $ 8/28/2024 We 4 31.61$ 9.18 290.16 $ 276.04 $ 566.20 $ 0.000 0.00 - $ - $ 8/28/2024 We 5 31.35$ 9.28 290 97 $ 279.05 $ 570.02 $ 0.000 0.00 - $ - $ 8/28/2024 We 6 33.04$ 9.78 323.14 $ 294.08 $ 617.23 $ 0.000 0.00 - $ - $ 8/28/2024 We 7 36.27$ 10.53 381 92 $ 316.64 $ 698.56 $ 0.000 0.00 - $ - $ 8/28/2024 We 8 30.90$ 11.12 343 66 $ 334.38 $ 678.04 $ 0.047 0.03 2 24 $ (0.50) $ 8/28/2024 We 9 24.79$ 12.08 299.41 $ 363.25 $ 662.65 $ 0.229 0.14 11.00 $ (3.32) $ 8/28/2024 We 10 24.24$ 13.29 322.16 $ 399.63 $ 721.79 $ 0.413 0.25 19.90 $ (6.14) $ 8/28/2024 We 11 24.59$ 14.63 359.79 $ 439.92 $ 799.72 $ 0.549 0.34 26.41 $ (8.03) $ 8/28/2024 We 12 26.16$ 16.32 426 92 $ 490.74 $ 917.66 $ 0.638 0.39 30.71 $ (8.72) $ 8/28/2024 We 13 28.19$ 18.76 528 93 $ 564.11 $ 1,093.04 $ 0.683 0.42 32.86 $ (8.48) $ 8/28/2024 We 14 29.77$ 21.41 637 29 $ 643.80 $ 1,281.09 $ 0.688 0.42 33.14 $ (7.89) $ 8/28/2024 We 15 33.41$ 23.74 793 07 $ 713.86 $ 1,506.93 $ 0.657 0.40 31.63 $ (6.06) $ 8/28/2024 We 16 35.62$ 25.09 893 59 $ 754.46 $ 1,648.05 $ 0.582 0.36 28.03 $ (4.59) $ 8/28/2024 We 17 37.10$ 25.47 945 06 $ 765.88 $ 1,710.94 $ 0.463 0.28 22.30 $ (3.23) $ 8/28/2024 We 18 47.26$ 24.88 1,175.72 $ 748.14 $ 1,923.86 $ 0.301 0.18 14.48 $ (0.22) $ 8/28/2024 We 19 62.55$ 23.36 1,461.25 $ 702.44 $ 2,163.69 $ 0.114 0.07 5.47 $ 0.98 $ 8/28/2024 We 20 60.00$ 20.81 1,248.60 $ 625.76 $ 1,874.36 $ 0.007 0.00 0 33 $ 0.05 $ 8/28/2024 We 21 49.01$ 18.68 915.47 $ 561.71 $ 1,477.18 $ 0.000 0.00 - $ - $ 8/28/2024 We 22 42.84$ 16.1 689.75 $ 484.13 $ 1,173.88 $ 0.000 0.00 - $ - $ 8/28/2024 We 23 38.34$ 13.71 525 60 $ 412.26 $ 937.86 $ 0.000 0.00 - $ - $ 8/28/2024 We 24 35.04$ 11.92 417.71 $ 358.43 $ 776.15 $ 0.000 0.00 - $ - $ 3.29 21.99 $ 22.90 $ 0.91 $ (50.14) $ 8/29/2024 Th 1 36.66$ 10.62 389 35 $ 319.34 $ 708.70 $ 0.000 0.00 - $ - $ 8/29/2024 Th 2 34.55$ 9.98 344 80 $ 300.10 $ 644.90 $ 0.000 0.00 - $ - $ 8/29/2024 Th 3 33.93$ 9.52 323 03 $ 286.27 $ 609.29 $ 0.000 0.00 - $ - $ 8/29/2024 Th 4 32.70$ 9.35 305.70 $ 281.15 $ 586.85 $ 0.000 0.00 - $ - $ 8/29/2024 Th 5 34.07$ 9.4 320 27 $ 282.66 $ 602.93 $ 0.000 0.00 - $ - $ 8/29/2024 Th 6 36.58$ 9.85 360 29 $ 296.19 $ 656.48 $ 0.000 0.00 - $ - $ 8/29/2024 Th 7 36.68$ 10.5 385.15 $ 315.74 $ 700.88 $ 0.000 0.00 - $ - $ 8/29/2024 Th 8 31.19$ 11.11 346 50 $ 334.08 $ 680.57 $ 0.047 0.03 2 25 $ (0.50) $ 8/29/2024 Th 9 23.68$ 11.64 275 65 $ 350.01 $ 625.67 $ 0.226 0.14 10.88 $ (3.43) $ 8/29/2024 Th 10 22.29$ 12.42 276 88 $ 373.47 $ 650.35 $ 0.412 0.25 19.82 $ (6.61) $ 8/29/2024 Th 11 22.18$ 13.45 298 32 $ 404.44 $ 702.76 $ 0.547 0.34 26.32 $ (8.81) $ 8/29/2024 Th 12 22.95$ 14.79 339 39 $ 444.74 $ 784.12 $ 0.638 0.39 30.71 $ (9.98) $ 8/29/2024 Th 13 23.46$ 16.51 387 28 $ 496.46 $ 883.73 $ 0.683 0.42 32.90 $ (10.48) $ 8/29/2024 Th 14 25.63$ 18.63 477.46 $ 560.20 $ 1,037.67 $ 0.686 0.42 33.05 $ (9.61) $ 8/29/2024 Th 15 27.37$ 20.46 560 03 $ 615.23 $ 1,175.26 $ 0.655 0.40 31.51 $ (8.46) $ 8/29/2024 Th 16 32.73$ 22.02 720.79 $ 662.14 $ 1,382.93 $ 0.579 0.36 27.89 $ (5.59) $ 8/29/2024 Th 17 35.28$ 23.27 820 93 $ 699.73 $ 1,520.66 $ 0.462 0.28 22.22 $ (3.73) $ 8/29/2024 Th 18 41.78$ 23.01 961.46 $ 691.91 $ 1,653.37 $ 0.295 0.18 14.22 $ (1.21) $ 8/29/2024 Th 19 55.37$ 22.14 1,225.91 $ 665.75 $ 1,891.66 $ 0.111 0.07 5 34 $ 0.47 $ 8/29/2024 Th 20 55.13$ 19.86 1,094.94 $ 597.19 $ 1,692.13 $ 0.006 0.00 0 30 $ 0.03 $ 8/29/2024 Th 21 45.68$ 18.12 827.77 $ 544.87 $ 1,372.64 $ 0.000 0.00 - $ - $ 8/29/2024 Th 22 39.73$ 15.63 620 97 $ 469.99 $ 1,090.96 $ 0.000 0.00 - $ - $ 8/29/2024 Th 23 38.89$ 13.4 521.18 $ 402.94 $ 924.12 $ 0.000 0.00 - $ - $ 8/29/2024 Th 24 38.05$ 11.59 441 00 $ 348.51 $ 789.51 $ 0.000 0.00 - $ - $ 3.28 21.99 $ 21.55 $ (0.44) $ (60.79) $ 8/30/2024 Fr 1 31.92$ 10.58 337.74 $ 318.14 $ 655.88 $ 0.000 0.00 - $ - $ 8/30/2024 Fr 2 32.47$ 9.78 317 53 $ 294.08 $ 611.61 $ 0.000 0.00 - $ - $ 8/30/2024 Fr 3 31.56$ 9.44 297 93 $ 283.86 $ 581.79 $ 0.000 0.00 - $ - $ 8/30/2024 Fr 4 31.48$ 9.24 290 84 $ 277.85 $ 568.69 $ 0.000 0.00 - $ - $
8/30/2024 Fr 5 32.22$ 9.3 299 69 $ 279.65 $ 579.34 $ 0.000 0.00 - $ - $ 8/30/2024 Fr 6 34.91$ 9.8 342 09 $ 294.69 $ 636.77 $ 0.000 0.00 - $ - $ 8/30/2024 Fr 7 37.93$ 10.37 393 36 $ 311.83 $ 705.18 $ 0.000 0.00 - $ - $ 8/30/2024 Fr 8 31.79$ 10.95 348.15 $ 329.27 $ 677.42 $ 0.048 0.03 2 32 $ (0.49) $ 8/30/2024 Fr 9 24.82$ 11.43 283 67 $ 343.70 $ 627.37 $ 0.222 0.14 10.66 $ (3.21) $ 8/30/2024 Fr 10 23.87$ 12.46 297.44 $ 374.67 $ 672.12 $ 0.407 0.25 19.58 $ (6.13) $ 8/30/2024 Fr 11 22.69$ 13.62 309 06 $ 409.55 $ 718.62 $ 0.551 0.34 26.51 $ (8.70) $ 8/30/2024 Fr 12 23.24$ 15.26 354 58 $ 458.87 $ 813.45 $ 0.634 0.39 30.52 $ (9.80) $ 8/30/2024 Fr 13 23.77$ 17 404.13 $ 511.19 $ 915.32 $ 0.683 0.42 32.88 $ (10.34) $ 8/30/2024 Fr 14 26.07$ 19.3 503.17 $ 580.35 $ 1,083.52 $ 0.687 0.42 33.06 $ (9.43) $ 8/30/2024 Fr 15 27.36$ 21.39 585.19 $ 643.20 $ 1,228.39 $ 0.654 0.40 31.50 $ (8.47) $ 8/30/2024 Fr 16 31.41$ 22.9 719 31 $ 688.60 $ 1,407.91 $ 0.578 0.35 27.85 $ (6.05) $ 8/30/2024 Fr 17 34.11$ 23.84 813.13 $ 716.87 $ 1,530.00 $ 0.459 0.28 22.11 $ (4.04) $ 8/30/2024 Fr 18 40.64$ 23.36 949 28 $ 702.44 $ 1,651.72 $ 0.293 0.18 14.11 $ (1.41) $ 8/30/2024 Fr 19 54.97$ 21.76 1,196.14 $ 654.32 $ 1,850.46 $ 0.109 0.07 5 24 $ 0.43 $ 8/30/2024 Fr 20 53.89$ 19.69 1,061.09 $ 592.08 $ 1,653.17 $ 0.005 0.00 0 24 $ 0.02 $ 8/30/2024 Fr 21 44.02$ 17.59 774 34 $ 528.93 $ 1,303.27 $ 0.000 0.00 - $ - $ 8/30/2024 Fr 22 38.94$ 15.44 601 25 $ 464.28 $ 1,065.53 $ 0.000 0.00 - $ - $ 8/30/2024 Fr 23 37.83$ 13.48 509 90 $ 405.34 $ 915.24 $ 0.000 0.00 - $ - $ 8/30/2024 Fr 24 35.80$ 11.78 421.70 $ 354.22 $ 775.93 $ 0.000 0.00 - $ - $ 3.27 21.99 $ 21.27 $ (0.72) $ (60.74) $ 8/31/2024 Sa 1 38.13$ 10.56 402 64 $ 317.54 $ 720.18 $ 0.000 0.00 - $ - $ 8/31/2024 Sa 2 36.49$ 9.83 358.70 $ 295.59 $ 654.29 $ 0.000 0.00 - $ - $ 8/31/2024 Sa 3 35.07$ 9.34 327 60 $ 280.85 $ 608.45 $ 0.000 0.00 - $ - $ 8/31/2024 Sa 4 34.70$ 9.07 314.73 $ 272.73 $ 587.47 $ 0.000 0.00 - $ - $ 8/31/2024 Sa 5 34.98$ 9.08 317 63 $ 273.04 $ 590.67 $ 0.000 0.00 - $ - $ 8/31/2024 Sa 6 36.47$ 9.02 328 93 $ 271.23 $ 600.16 $ 0.000 0.00 - $ - $ 8/31/2024 Sa 7 33.66$ 9.23 310.72 $ 277.55 $ 588.27 $ 0.000 0.00 - $ - $ 8/31/2024 Sa 8 30.81$ 9.28 285 96 $ 279.05 $ 565.01 $ 0.046 0.03 2 22 $ (0.50) $ 8/31/2024 Sa 9 20.38$ 10.01 204 00 $ 301.00 $ 505.00 $ 0.221 0.14 10.65 $ (3.81) $ 8/31/2024 Sa 10 19.07$ 10.94 208 64 $ 328.97 $ 537.60 $ 0.405 0.25 19.51 $ (7.30) $ 8/31/2024 Sa 11 18.85$ 11.75 221.48 $ 353.32 $ 574.80 $ 0.543 0.33 26.16 $ (9.87) $ 8/31/2024 Sa 12 18.27$ 13.16 240.40 $ 395.72 $ 636.12 $ 0.639 0.39 30.74 $ (11.82) $ 8/31/2024 Sa 13 17.81$ 15 267.16 $ 451.05 $ 718.21 $ 0.687 0.42 33.06 $ (12.90) $ 8/31/2024 Sa 14 18.64$ 17.32 322 86 $ 520.81 $ 843.67 $ 0.695 0.43 33.47 $ (12.71) $ 8/31/2024 Sa 15 20.41$ 19.1 389 89 $ 574.34 $ 964.22 $ 0.664 0.41 31.95 $ (11.41) $ 8/31/2024 Sa 16 27.04$ 20.4 551 58 $ 613.43 $ 1,165.00 $ 0.588 0.36 28.29 $ (7.72) $ 8/31/2024 Sa 17 30.73$ 21.33 655.47 $ 641.39 $ 1,296.86 $ 0.468 0.29 22.53 $ (5.09) $ 8/31/2024 Sa 18 40.87$ 20.89 853 68 $ 628.16 $ 1,481.84 $ 0.284 0.17 13.69 $ (1.32) $ 8/31/2024 Sa 19 49.94$ 19.61 979 30 $ 589.67 $ 1,568.97 $ 0.105 0.06 5 05 $ 0.09 $ 8/31/2024 Sa 20 51.14$ 17.5 895 00 $ 526.23 $ 1,421.22 $ 0.004 0.00 0 20 $ 0.01 $ 8/31/2024 Sa 21 47.01$ 15.79 742 30 $ 474.81 $ 1,217.11 $ 0.000 0.00 - $ - $ 8/31/2024 Sa 22 40.93$ 13.91 569 31 $ 418.27 $ 987.59 $ 0.000 0.00 - $ - $ 8/31/2024 Sa 23 40.49$ 12.08 489.15 $ 363.25 $ 852.39 $ 0.000 0.00 - $ - $ 8/31/2024 Sa 24 38.58$ 10.75 414 69 $ 323.25 $ 737.95 $ 0.000 0.00 - $ - $ 3.28 21.99 $ 20.51 $ (1.48) $ (74 81) $ 9/1/2024 Su 1 36.73$ 9.73 357.42 $ 292.58 $ 650.00 $ 0.000 0.00 - $ - $ 9/1/2024 Su 2 35.80$ 9.1 325.74 $ 273.64 $ 599.38 $ 0.000 0.00 - $ - $ 9/1/2024 Su 3 35.66$ 8.8 313.78 $ 264.62 $ 578.40 $ 0.000 0.00 - $ - $ 9/1/2024 Su 4 35.67$ 8.51 303 53 $ 255.90 $ 559.42 $ 0.000 0.00 - $ - $ 9/1/2024 Su 5 34.61$ 8.55 295 89 $ 257.10 $ 552.99 $ 0.000 0.00 - $ - $ 9/1/2024 Su 6 35.13$ 8.65 303 85 $ 260.11 $ 563.96 $ 0.000 0.00 - $ - $ 9/1/2024 Su 7 35.21$ 8.86 311 98 $ 266.42 $ 578.40 $ 0.000 0.00 - $ - $ 9/1/2024 Su 8 29.33$ 9.14 268 06 $ 274.84 $ 542.90 $ 0.046 0.03 2.19 $ (0.53) $ 9/1/2024 Su 9 16.93$ 9.75 165 09 $ 293.18 $ 458.27 $ 0.215 0.13 10.34 $ (4.15) $ 9/1/2024 Su 10 18.96$ 10.22 193 80 $ 307.32 $ 501.12 $ 0.394 0.24 18.95 $ (7.12) $ 9/1/2024 Su 11 18.33$ 10.94 200 51 $ 328.97 $ 529.48 $ 0.531 0.33 25.56 $ (9.81) $ 9/1/2024 Su 12 17.58$ 11.66 204 96 $ 350.62 $ 555.58 $ 0.613 0.38 29.52 $ (11.61) $ 9/1/2024 Su 13 17.72$ 12.61 223.46 $ 379.18 $ 602.64 $ 0.658 0.40 31.67 $ (12.40) $ 9/1/2024 Su 14 17.90$ 14.03 251.14 $ 421.88 $ 673.02 $ 0.665 0.41 32.02 $ (12.46) $ 9/1/2024 Su 15 19.44$ 15.33 298 03 $ 460.97 $ 759.01 $ 0.631 0.39 30.38 $ (11.23) $ 9/1/2024 Su 16 25.35$ 16.47 417 53 $ 495.25 $ 912.78 $ 0.561 0.34 27.01 $ (7.95) $ 9/1/2024 Su 17 30.14$ 17.03 513 22 $ 512.09 $ 1,025.31 $ 0.442 0.27 21.26 $ (4.96) $
9/1/2024 Su 18 35.68$ 17.06 608.72 $ 512.99 $ 1,121.72 $ 0.280 0.17 13.48 $ (2.19) $ 9/1/2024 Su 19 50.49$ 16.45 830 61 $ 494.65 $ 1,325.26 $ 0.103 0.06 4 95 $ 0.13 $ 9/1/2024 Su 20 51.22$ 14.57 746 33 $ 438.12 $ 1,184.45 $ 0.003 0.00 0.14 $ 0.00 $ 9/1/2024 Su 21 45.64$ 13.4 611 53 $ 402.94 $ 1,014.47 $ 0.000 0.00 - $ - $ 9/1/2024 Su 22 41.27$ 12.16 501 89 $ 365.65 $ 867.54 $ 0.000 0.00 - $ - $ 9/1/2024 Su 23 39.23$ 10.94 429 21 $ 328.97 $ 758.17 $ 0.000 0.00 - $ - $ 9/1/2024 Su 24 35.77$ 9.87 353 04 $ 296.79 $ 649.83 $ 0.000 0.00 - $ - $ 3.15 21.99 $ 20.15 $ (1.84) $ (74 99) $ 9/2/2024 Mo 1 34.47$ 9.05 311 96 $ 272.13 $ 584.10 $ 0.000 0.00 - $ - $ 9/2/2024 Mo 2 34.41$ 8.69 299 05 $ 261.31 $ 560.36 $ 0.000 0.00 - $ - $ 9/2/2024 Mo 3 34.17$ 8.41 287 34 $ 252.89 $ 540.23 $ 0.000 0.00 - $ - $ 9/2/2024 Mo 4 33.44$ 8.31 277 90 $ 249.88 $ 527.78 $ 0.000 0.00 - $ - $ 9/2/2024 Mo 5 33.56$ 8.34 279 90 $ 250.78 $ 530.69 $ 0.000 0.00 - $ - $ 9/2/2024 Mo 6 33.22$ 8.63 286.72 $ 259.50 $ 546.22 $ 0.000 0.00 - $ - $ 9/2/2024 Mo 7 33.03$ 8.9 294 01 $ 267.62 $ 561.63 $ 0.000 0.00 - $ - $ 9/2/2024 Mo 8 29.33$ 8.84 259 27 $ 265.82 $ 525.09 $ 0.045 0.03 2.17 $ (0.53) $ 9/2/2024 Mo 9 19.92$ 9.43 187 85 $ 283.56 $ 471.41 $ 0.219 0.13 10.52 $ (3.82) $ 9/2/2024 Mo 10 26.06$ 9.92 258 54 $ 298.29 $ 556.84 $ 0.402 0.25 19.36 $ (5.52) $ 9/2/2024 Mo 11 18.07$ 10.64 192 23 $ 319.94 $ 512.17 $ 0.537 0.33 25.85 $ (10.01) $ 9/2/2024 Mo 12 18.20$ 11.12 202 38 $ 334.38 $ 536.76 $ 0.629 0.39 30.28 $ (11.67) $ 9/2/2024 Mo 13 17.85$ 11.91 212 55 $ 358.13 $ 570.68 $ 0.675 0.41 32.49 $ (12.67) $ 9/2/2024 Mo 14 17.48$ 12.73 222 53 $ 382.79 $ 605.32 $ 0.677 0.42 32.61 $ (12.87) $ 9/2/2024 Mo 15 19.04$ 14.21 270 52 $ 427.29 $ 697.81 $ 0.642 0.39 30.89 $ (11.58) $ 9/2/2024 Mo 16 24.08$ 14.66 353 01 $ 440.83 $ 793.84 $ 0.566 0.35 27.26 $ (8.46) $ 9/2/2024 Mo 17 28.23$ 15.64 441 52 $ 470.29 $ 911.81 $ 0.447 0.27 21.53 $ (5.55) $ 9/2/2024 Mo 18 33.61$ 15.85 532.71 $ 476.61 $ 1,009.32 $ 0.282 0.17 13.56 $ (2.56) $ 9/2/2024 Mo 19 49.69$ 15.17 753.77 $ 456.16 $ 1,209.93 $ 0.100 0.06 4 82 $ 0.08 $ 9/2/2024 Mo 20 55.17$ 13.93 768 52 $ 418.88 $ 1,187.39 $ 0.002 0.00 0.10 $ 0.01 $ 9/2/2024 Mo 21 47.73$ 12.95 618.10 $ 389.41 $ 1,007.51 $ 0.000 0.00 - $ - $ 9/2/2024 Mo 22 36.21$ 11.65 421 88 $ 350.32 $ 772.19 $ 0.000 0.00 - $ - $ 9/2/2024 Mo 23 35.75$ 10.49 375 06 $ 315.43 $ 690.50 $ 0.000 0.00 - $ - $ 9/2/2024 Mo 24 34.94$ 9.51 332 32 $ 285.97 $ 618.28 $ 0.000 0.00 - $ - $ 3.20 21.99 $ 20.09 $ (1.90) $ (75 83) $ 9/3/2024 Tu 1 32.73$ 8.74 286 02 $ 262.81 $ 548.84 $ 0.000 0.00 - $ - $ 9/3/2024 Tu 2 32.43$ 8.39 272.12 $ 252.29 $ 524.41 $ 0.000 0.00 - $ - $ 9/3/2024 Tu 3 32.57$ 8.3 270 32 $ 249.58 $ 519.90 $ 0.000 0.00 - $ - $ 9/3/2024 Tu 4 32.51$ 8.22 267 23 $ 247.18 $ 514.41 $ 0.000 0.00 - $ - $ 9/3/2024 Tu 5 32.68$ 8.45 276.16 $ 254.09 $ 530.26 $ 0.000 0.00 - $ - $ 9/3/2024 Tu 6 38.54$ 9.18 353 82 $ 276.04 $ 629.86 $ 0.000 0.00 - $ - $ 9/3/2024 Tu 7 39.66$ 9.93 393 84 $ 298.60 $ 692.44 $ 0.000 0.00 - $ - $ 9/3/2024 Tu 8 36.17$ 10.73 388.13 $ 322.65 $ 710.78 $ 0.018 0.01 0 87 $ (0.14) $ 9/3/2024 Tu 9 30.04$ 11.42 343 01 $ 343.40 $ 686.41 $ 0.008 0.00 0 37 $ (0.09) $ 9/3/2024 Tu 10 28.38$ 12.16 345.11 $ 365.65 $ 710.76 $ 0.116 0.07 5 59 $ (1.43) $ 9/3/2024 Tu 11 28.47$ 12.93 368 08 $ 388.81 $ 756.89 $ 0.075 0.05 3 62 $ (0.92) $ 9/3/2024 Tu 12 28.23$ 14.28 403 06 $ 429.40 $ 832.46 $ 0.632 0.39 30.41 $ (7.84) $ 9/3/2024 Tu 13 28.76$ 15.69 451 21 $ 471.80 $ 923.01 $ 0.668 0.41 32.17 $ (8.07) $ 9/3/2024 Tu 14 32.57$ 17.77 578.71 $ 534.34 $ 1,113.05 $ 0.662 0.41 31.87 $ (6.45) $ 9/3/2024 Tu 15 32.73$ 19.99 654 20 $ 601.10 $ 1,255.30 $ 0.626 0.38 30.15 $ (6.04) $ 9/3/2024 Tu 16 33.71$ 21.72 732.15 $ 653.12 $ 1,385.27 $ 0.548 0.34 26.38 $ (4.96) $ 9/3/2024 Tu 17 41.16$ 22.92 943 35 $ 689.20 $ 1,632.55 $ 0.429 0.26 20.67 $ (1.92) $ 9/3/2024 Tu 18 56.38$ 22.66 1,277.63 $ 681.39 $ 1,959.02 $ 0.270 0.17 12.99 $ 1.31 $ 9/3/2024 Tu 19 90.85$ 21.2 1,926.12 $ 637.48 $ 2,563.61 $ 0.096 0.06 4 64 $ 2.50 $ 9/3/2024 Tu 20 100.40 $ 19.06 1,913.60 $ 573.13 $ 2,486.73 $ 0.003 0.00 0.13 $ 0.08 $ 9/3/2024 Tu 21 59.88$ 17.19 1,029.37 $ 516.90 $ 1,546.28 $ 0.000 0.00 - $ - $ 9/3/2024 Tu 22 47.55$ 14.71 699.43 $ 442.33 $ 1,141.76 $ 0.000 0.00 - $ - $ 9/3/2024 Tu 23 43.08$ 12.68 546 30 $ 381.29 $ 927.58 $ 0.000 0.00 - $ - $ 9/3/2024 Tu 24 41.12$ 11.05 454.43 $ 332.27 $ 786.70 $ 0.000 0.00 - $ - $ 2.54 21.99 $ 28.64 $ 6.65 $ (31 66) $ 9/4/2024 We 1 42.29$ 9.93 419 97 $ 298.60 $ 718.56 $ 0.000 0.00 - $ - $ 9/4/2024 We 2 41.96$ 9.48 397 80 $ 285.06 $ 682.86 $ 0.000 0.00 - $ - $ 9/4/2024 We 3 40.92$ 9.02 369 08 $ 271.23 $ 640.31 $ 0.000 0.00 - $ - $ 9/4/2024 We 4 40.21$ 8.8 353 84 $ 264.62 $ 618.45 $ 0.000 0.00 - $ - $ 9/4/2024 We 5 40.23$ 8.94 359 63 $ 268.83 $ 628.45 $ 0.000 0.00 - $ - $ 9/4/2024 We 6 42.69$ 9.51 405 94 $ 285.97 $ 691.91 $ 0.000 0.00 - $ - $
9/4/2024 We 7 48.86$ 10.21 498 90 $ 307.01 $ 805.91 $ 0.000 0.00 - $ - $ 9/4/2024 We 8 37.75$ 10.92 412 27 $ 328.36 $ 740.63 $ 0.045 0.03 2.15 $ (0.29) $ 9/4/2024 We 9 34.12$ 11.76 401 27 $ 353.62 $ 754.89 $ 0.143 0.09 6 88 $ (1.26) $ 9/4/2024 We 10 33.31$ 12.74 424 37 $ 383.09 $ 807.46 $ 0.403 0.25 19.41 $ (3.75) $ 9/4/2024 We 11 33.19$ 13.72 455 35 $ 412.56 $ 867.91 $ 0.540 0.33 25.98 $ (5.05) $ 9/4/2024 We 12 34.78$ 15.62 543.19 $ 469.69 $ 1,012.88 $ 0.631 0.39 30.37 $ (5.29) $ 9/4/2024 We 13 37.24$ 17.84 664 31 $ 536.45 $ 1,200.76 $ 0.679 0.42 32.67 $ (4.67) $ 9/4/2024 We 14 39.31$ 20.72 814.48 $ 623.05 $ 1,437.53 $ 0.682 0.42 32.83 $ (3.83) $ 9/4/2024 We 15 42.30$ 23.47 992 84 $ 705.74 $ 1,698.58 $ 0.650 0.40 31.29 $ (2.45) $ 9/4/2024 We 16 54.63$ 25.37 1,386.07 $ 762.88 $ 2,148.95 $ 0.575 0.35 27.68 $ 2.17 $ 9/4/2024 We 17 67.33$ 26.2 1,763.97 $ 787.83 $ 2,551.80 $ 0.456 0.28 21.94 $ 5.27 $ 9/4/2024 We 18 101.82 $ 25.23 2,568.94 $ 758.67 $ 3,327.61 $ 0.287 0.18 13.82 $ 9.39 $ 9/4/2024 We 19 235.77 $ 23.74 5,597.18 $ 713.86 $ 6,311.04 $ 0.100 0.06 4 80 $ 11.44 $ 9/4/2024 We 20 274.56 $ 21.26 5,837.15 $ 639.29 $ 6,476.43 $ 0.000 0.00 - $ - $ 9/4/2024 We 21 109.10 $ 19.12 2,085.96 $ 574.94 $ 2,660.90 $ 0.000 0.00 - $ - $ 9/4/2024 We 22 66.40$ 16.32 1,083.61 $ 490.74 $ 1,574.35 $ 0.000 0.00 - $ - $ 9/4/2024 We 23 52.97$ 13.91 736 80 $ 418.27 $ 1,155.07 $ 0.000 0.00 - $ - $ 9/4/2024 We 24 43.25$ 12.01 519.45 $ 361.14 $ 880.59 $ 0.000 0.00 - $ - $ 3.18 21.99 $ 55.98 $ 33.99 $ 2.49 $ 9/5/2024 Th 1 41.98$ 10.77 452.17 $ 323.85 $ 776.03 $ 0.000 0.00 - $ - $ 9/5/2024 Th 2 41.43$ 10.05 416 37 $ 302.20 $ 718.57 $ 0.000 0.00 - $ - $ 9/5/2024 Th 3 41.26$ 9.48 391.18 $ 285.06 $ 676.25 $ 0.000 0.00 - $ - $ 9/5/2024 Th 4 41.29$ 9.15 377 81 $ 275.14 $ 652.95 $ 0.000 0.00 - $ - $ 9/5/2024 Th 5 41.13$ 9.29 382.10 $ 279.35 $ 661.45 $ 0.000 0.00 - $ - $ 9/5/2024 Th 6 42.88$ 9.81 420.70 $ 294.99 $ 715.69 $ 0.000 0.00 - $ - $ 9/5/2024 Th 7 54.11$ 10.56 571.40 $ 317.54 $ 888.94 $ 0.000 0.00 - $ - $ 9/5/2024 Th 8 46.73$ 11.3 528 01 $ 339.79 $ 867.80 $ 0.045 0.03 2.18 $ (0.05) $ 9/5/2024 Th 9 38.27$ 12.07 461 94 $ 362.94 $ 824.88 $ 0.232 0.14 11.19 $ (1.45) $ 9/5/2024 Th 10 37.70$ 13.1 493 87 $ 393.92 $ 887.79 $ 0.313 0.19 15.06 $ (2.06) $ 9/5/2024 Th 11 37.88$ 14.62 553.75 $ 439.62 $ 993.38 $ 0.569 0.35 27.41 $ (3.70) $ 9/5/2024 Th 12 38.61$ 16.52 637.79 $ 496.76 $ 1,134.55 $ 0.662 0.41 31.89 $ (4.00) $ 9/5/2024 Th 13 40.10$ 18.73 751 09 $ 563.21 $ 1,314.31 $ 0.710 0.44 34.19 $ (3.64) $ 9/5/2024 Th 14 45.72$ 21.44 980.18 $ 644.70 $ 1,624.88 $ 0.714 0.44 34.35 $ (1.20) $ 9/5/2024 Th 15 54.88$ 23.41 1,284.85 $ 703.94 $ 1,988.79 $ 0.674 0.41 32.43 $ 2.65 $ 9/5/2024 Th 16 69.63$ 25 1,740.72 $ 751.75 $ 2,492.47 $ 0.597 0.37 28.74 $ 7.75 $ 9/5/2024 Th 17 87.13$ 25.48 2,220.02 $ 766.18 $ 2,986.20 $ 0.472 0.29 22.71 $ 11.18 $ 9/5/2024 Th 18 165.93 $ 24.9 $ 4,131.70 $ 748.74 $ 4,880.44 0.302 0.19 $ 14.53 $ 21.73 9/5/2024 Th 19 380.03 $ 23.07 8,767.26 $ 693.71 $ 9,460.97 $ 0.102 0.06 4 92 $ 20.75 $ 9/5/2024 Th 20 502.04 $ 20.67 10,377.18 $ 621.55 $ 10,998.72 $ 0.000 0.00 - $ - $ 9/5/2024 Th 21 165.84 $ 18.61 3,086.35 $ 559.60 $ 3,645.95 $ 0.000 0.00 - $ - $ 9/5/2024 Th 22 79.08$ 15.96 1,262.08 $ 479.92 $ 1,741.99 $ 0.000 0.00 - $ - $ 9/5/2024 Th 23 54.97$ 13.57 746 00 $ 408.05 $ 1,154.05 $ 0.000 0.00 - $ - $ 9/5/2024 Th 24 51.30$ 11.78 604 31 $ 354.22 $ 958.54 $ 0.000 0.00 - $ - $ 3.31 21.99 $ 87.88 $ 65.89 $ 47 53 $ 9/6/2024 Fr 1 46.62$ 10.51 489 93 $ 316.04 $ 805.97 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 2 39.59$ 9.74 385 62 $ 292.88 $ 678.51 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 3 39.03$ 9.32 363.72 $ 280.25 $ 643.97 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 4 38.87$ 9.08 352 91 $ 273.04 $ 625.95 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 5 39.09$ 9.14 357 31 $ 274.84 $ 632.15 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 6 43.64$ 9.4 410 23 $ 282.66 $ 692.88 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 7 47.32$ 10.23 484 04 $ 307.62 $ 791.65 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 8 40.57$ 10.88 441.45 $ 327.16 $ 768.61 $ 0.046 0.03 2 21 $ (0.22) $ 9/6/2024 Fr 9 34.79$ 11.56 402.18 $ 347.61 $ 749.79 $ 0.029 0.02 1 37 $ (0.24) $ 9/6/2024 Fr 10 34.79$ 12.53 435 97 $ 376.78 $ 812.74 $ 0.157 0.10 7 57 $ (1.32) $ 9/6/2024 Fr 11 33.57$ 13.8 463 24 $ 414.97 $ 878.20 $ 0.200 0.12 9 64 $ (1.83) $ 9/6/2024 Fr 12 36.00$ 15.1 543 60 $ 454.06 $ 997.66 $ 0.420 0.26 20.24 $ (3.21) $ 9/6/2024 Fr 13 34.90$ 17.04 594.71 $ 512.39 $ 1,107.10 $ 0.603 0.37 29.05 $ (5.02) $ 9/6/2024 Fr 14 36.59$ 19.48 712.79 $ 585.76 $ 1,298.55 $ 0.725 0.44 34.92 $ (5.28) $ 9/6/2024 Fr 15 41.15$ 21.69 892 56 $ 652.22 $ 1,544.77 $ 0.685 0.42 32.96 $ (3.07) $ 9/6/2024 Fr 16 53.49$ 23.47 1,255.39 $ 705.74 $ 1,961.13 $ 0.601 0.37 28.94 $ 1.85 $ 9/6/2024 Fr 17 57.87$ 24.34 1,408.57 $ 731.90 $ 2,140.47 $ 0.471 0.29 22.69 $ 2.72 $ 9/6/2024 Fr 18 79.84$ 23.5 1,876.14 $ 706.65 $ 2,582.78 $ 0.295 0.18 14.19 $ 5.67 $ 9/6/2024 Fr 19 147.96 $ 21.57 3,191.58 $ 648.61 $ 3,840.19 $ 0.098 0.06 4.73 $ 5.99 $
9/6/2024 Fr 20 146.42 $ 19.04 2,787.87 $ 572.53 $ 3,360.40 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 21 77.67$ 16.92 1,314.18 $ 508.78 $ 1,822.97 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 22 54.69$ 14.62 799 61 $ 439.62 $ 1,239.23 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 23 44.37$ 12.49 554 20 $ 375.57 $ 929.78 $ 0.000 0.00 - $ - $ 9/6/2024 Fr 24 43.29$ 10.97 474 88 $ 329.87 $ 804.75 $ 0.000 0.00 - $ - $ 2.66 21.99 $ 38.67 $ 16.68 $ (7 38) $ 9/7/2024 Sa 1 50.59$ 9.87 499 35 $ 296.79 $ 796.15 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 2 46.32$ 9.31 431 22 $ 279.95 $ 711.18 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 3 41.29$ 8.95 369 54 $ 269.13 $ 638.66 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 4 38.61$ 8.72 336 65 $ 262.21 $ 598.86 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 5 39.25$ 8.75 343.43 $ 263.11 $ 606.54 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 6 39.80$ 8.74 347 85 $ 262.81 $ 610.67 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 7 39.64$ 8.84 350.41 $ 265.82 $ 616.23 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 8 37.58$ 8.84 332 20 $ 265.82 $ 598.02 $ 0.041 0.03 1 97 $ (0.27) $ 9/7/2024 Sa 9 32.42$ 9.53 309 00 $ 286.57 $ 595.57 $ 0.075 0.05 3 63 $ (0.74) $ 9/7/2024 Sa 10 30.00$ 10.18 305.40 $ 306.11 $ 611.51 $ 0.292 0.18 14.05 $ (3.30) $ 9/7/2024 Sa 11 30.00$ 10.93 327 90 $ 328.67 $ 656.57 $ 0.422 0.26 20.30 $ (4.77) $ 9/7/2024 Sa 12 30.14$ 11.93 359 51 $ 358.74 $ 718.25 $ 0.587 0.36 28.25 $ (6.59) $ 9/7/2024 Sa 13 30.48$ 13.15 400 81 $ 395.42 $ 796.23 $ 0.473 0.29 22.76 $ (5.21) $ 9/7/2024 Sa 14 32.20$ 14.65 471.76 $ 440.53 $ 912.29 $ 0.470 0.29 22.61 $ (4.68) $ 9/7/2024 Sa 15 32.32$ 16.56 535.19 $ 497.96 $ 1,033.15 $ 0.347 0.21 16.70 $ (3.43) $ 9/7/2024 Sa 16 38.00$ 18.13 688 94 $ 545.17 $ 1,234.11 $ 0.341 0.21 16.42 $ (2.19) $ 9/7/2024 Sa 17 42.50$ 18.82 799 93 $ 565.92 $ 1,365.85 $ 0.190 0.12 9.17 $ (0.70) $ 9/7/2024 Sa 18 50.85$ 19.04 968.11 $ 572.53 $ 1,540.64 $ 0.239 0.15 11.49 $ 0.35 $ 9/7/2024 Sa 19 82.72$ 18.19 1,504.65 $ 546.97 $ 2,051.62 $ 0.096 0.06 4 64 $ 2.02 $ 9/7/2024 Sa 20 79.99$ 16.5 1,319.85 $ 496.16 $ 1,816.01 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 21 57.43$ 15.09 866 62 $ 453.76 $ 1,320.38 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 22 49.84$ 13.13 654 37 $ 394.82 $ 1,049.19 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 23 42.79$ 11.5 492 07 $ 345.81 $ 837.88 $ 0.000 0.00 - $ - $ 9/7/2024 Sa 24 37.65$ 10.17 382 91 $ 305.81 $ 688.72 $ 0.000 0.00 - $ - $ 2.19 21.99 $ 26.34 $ 4.35 $ (25.40) $ 9/8/2024 Su 1 45.73$ 9.27 423 87 $ 278.75 $ 702.62 $ 0.000 0.00 - $ - $ 9/8/2024 Su 2 34.63$ 8.67 300 20 $ 260.71 $ 560.91 $ 0.000 0.00 - $ - $ 9/8/2024 Su 3 35.73$ 8.38 299.45 $ 251.99 $ 551.44 $ 0.000 0.00 - $ - $ 9/8/2024 Su 4 35.55$ 8.2 291.49 $ 246.57 $ 538.07 $ 0.000 0.00 - $ - $ 9/8/2024 Su 5 35.23$ 8.31 292.76 $ 249.88 $ 542.64 $ 0.000 0.00 - $ - $ 9/8/2024 Su 6 34.44$ 8.46 291 33 $ 254.39 $ 545.72 $ 0.000 0.00 - $ - $ 9/8/2024 Su 7 33.96$ 8.68 294.78 $ 261.01 $ 555.78 $ 0.000 0.00 - $ - $ 9/8/2024 Su 8 33.00$ 8.66 285.75 $ 260.41 $ 546.16 $ 0.045 0.03 2.16 $ (0.43) $ 9/8/2024 Su 9 28.75$ 9.09 261 30 $ 273.34 $ 534.64 $ 0.224 0.14 10.79 $ (2.71) $ 9/8/2024 Su 10 26.79$ 9.76 261.44 $ 293.48 $ 554.92 $ 0.399 0.24 19.22 $ (5.31) $ 9/8/2024 Su 11 25.64$ 10.54 270 25 $ 316.94 $ 587.18 $ 0.580 0.36 27.93 $ (8.12) $ 9/8/2024 Su 12 26.32$ 11.33 298.17 $ 340.69 $ 638.86 $ 0.668 0.41 32.16 $ (9.07) $ 9/8/2024 Su 13 27.61$ 12.62 348.44 $ 379.48 $ 727.93 $ 0.715 0.44 34.43 $ (9.14) $ 9/8/2024 Su 14 28.84$ 14.39 415 02 $ 432.71 $ 847.72 $ 0.718 0.44 34.57 $ (8.64) $ 9/8/2024 Su 15 29.40$ 16.29 478 87 $ 489.84 $ 968.71 $ 0.603 0.37 29.04 $ (7.05) $ 9/8/2024 Su 16 35.13$ 17.89 628 55 $ 537.95 $ 1,166.50 $ 0.545 0.33 26.23 $ (4.45) $ 9/8/2024 Su 17 37.05$ 19 704 03 $ 571.33 $ 1,275.36 $ 0.427 0.26 20.57 $ (2.99) $ 9/8/2024 Su 18 40.35$ 19.7 794 89 $ 592.38 $ 1,387.27 $ 0.237 0.15 11.43 $ (1.18) $ 9/8/2024 Su 19 67.99$ 19 1,291.81 $ 571.33 $ 1,863.14 $ 0.053 0.03 2 57 $ 0.64 $ 9/8/2024 Su 20 66.82$ 17.34 1,158.60 $ 521.41 $ 1,680.01 $ 0.000 0.00 - $ - $ 9/8/2024 Su 21 54.72$ 15.81 865 06 $ 475.41 $ 1,340.46 $ 0.000 0.00 - $ - $ 9/8/2024 Su 22 47.74$ 13.83 660 31 $ 415.87 $ 1,076.18 $ 0.000 0.00 - $ - $ 9/8/2024 Su 23 42.99$ 11.91 511 95 $ 358.13 $ 870.09 $ 0.000 0.00 - $ - $ 9/8/2024 Su 24 40.73$ 10.47 426.42 $ 314.83 $ 741.25 $ 0.000 0.00 - $ - $ 3.20 21.99 $ 23.27 $ 1.28 $ (51 55) $ 9/9/2024 Mo 1 37.46$ 9.51 356 21 $ 285.97 $ 642.18 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 2 39.25$ 8.98 352.44 $ 270.03 $ 622.47 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 3 35.45$ 8.7 308 38 $ 261.61 $ 569.99 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 4 35.07$ 8.59 301 24 $ 258.30 $ 559.54 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 5 35.20$ 8.86 311 86 $ 266.42 $ 578.28 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 6 39.40$ 9.51 374 68 $ 285.97 $ 660.64 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 7 42.07$ 10.23 430 39 $ 307.62 $ 738.00 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 8 38.00$ 10.92 414 95 $ 328.36 $ 743.32 $ 0.005 0.00 0 23 $ (0.03) $
9/9/2024 Mo 9 33.33$ 11.83 394 25 $ 355.73 $ 749.98 $ 0.063 0.04 3 02 $ (0.58) $ 9/9/2024 Mo 10 32.89$ 12.66 416.42 $ 380.69 $ 797.10 $ 0.257 0.16 12.36 $ (2.45) $ 9/9/2024 Mo 11 30.26$ 13.76 416 36 $ 413.76 $ 830.12 $ 0.152 0.09 7 32 $ (1.70) $ 9/9/2024 Mo 12 29.67$ 15.3 453 91 $ 460.07 $ 913.98 $ 0.188 0.12 9 05 $ (2.17) $ 9/9/2024 Mo 13 29.49$ 17.24 508.49 $ 518.41 $ 1,026.90 $ 0.202 0.12 9.71 $ (2.34) $ 9/9/2024 Mo 14 31.03$ 19.86 616 31 $ 597.19 $ 1,213.50 $ 0.189 0.12 9.10 $ (2.02) $ 9/9/2024 Mo 15 36.69$ 21.86 802 09 $ 657.33 $ 1,459.42 $ 0.215 0.13 10.33 $ (1.55) $ 9/9/2024 Mo 16 40.00$ 22.85 914 00 $ 687.10 $ 1,601.10 $ 0.267 0.16 12.87 $ (1.39) $ 9/9/2024 Mo 17 42.70$ 23.25 992.77 $ 699.13 $ 1,691.89 $ 0.274 0.17 13.17 $ (0.97) $ 9/9/2024 Mo 18 50.60$ 22.76 1,151.66 $ 684.39 $ 1,836.05 $ 0.084 0.05 4 02 $ 0.11 $ 9/9/2024 Mo 19 69.15$ 21.08 1,457.74 $ 633.88 $ 2,091.62 $ 0.093 0.06 4.46 $ 1.18 $ 9/9/2024 Mo 20 69.00$ 18.9 1,304.07 $ 568.32 $ 1,872.39 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 21 53.73$ 17 913.43 $ 511.19 $ 1,424.62 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 22 42.81$ 14.54 622.45 $ 437.22 $ 1,059.67 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 23 41.61$ 12.51 520 58 $ 376.18 $ 896.76 $ 0.000 0.00 - $ - $ 9/9/2024 Mo 24 39.74$ 11.06 439.47 $ 332.57 $ 772.05 $ 0.000 0.00 - $ - $ 1.22 21.99 $ 24.62 $ 2.63 $ (11.76) $ 9/10/2024 Tu 1 35.87$ 9.96 357 27 $ 299.50 $ 656.77 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 2 35.62$ 9.5 338 37 $ 285.67 $ 624.03 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 3 35.11$ 9.07 318.49 $ 272.73 $ 591.23 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 4 34.79$ 8.95 311.40 $ 269.13 $ 580.52 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 5 35.19$ 9.11 320 56 $ 273.94 $ 594.50 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 6 38.72$ 9.54 369.43 $ 286.87 $ 656.29 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 7 40.81$ 10.34 421 97 $ 310.92 $ 732.90 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 8 35.83$ 11.07 396 58 $ 332.87 $ 729.46 $ 0.043 0.03 2 07 $ (0.33) $ 9/10/2024 Tu 9 29.31$ 11.48 336.45 $ 345.20 $ 681.65 $ 0.231 0.14 11.11 $ (2.71) $ 9/10/2024 Tu 10 27.01$ 11.69 315.77 $ 351.52 $ 667.29 $ 0.423 0.26 20.37 $ (5.56) $ 9/10/2024 Tu 11 26.12$ 12.5 326.46 $ 375.88 $ 702.33 $ 0.564 0.35 27.17 $ (7.73) $ 9/10/2024 Tu 12 25.99$ 13.04 338 91 $ 392.11 $ 731.02 $ 0.576 0.35 27.75 $ (7.94) $ 9/10/2024 Tu 13 26.46$ 14.24 376.79 $ 428.20 $ 804.99 $ 0.611 0.37 29.41 $ (8.24) $ 9/10/2024 Tu 14 28.01$ 15.75 441.14 $ 473.60 $ 914.74 $ 0.710 0.44 34.18 $ (8.90) $ 9/10/2024 Tu 15 29.80$ 17.68 526 82 $ 531.64 $ 1,058.46 $ 0.665 0.41 32.00 $ (7.61) $ 9/10/2024 Tu 16 32.31$ 18.83 608.44 $ 566.22 $ 1,174.66 $ 0.578 0.35 27.82 $ (5.72) $ 9/10/2024 Tu 17 32.84$ 19.05 625 67 $ 572.83 $ 1,198.50 $ 0.450 0.28 21.66 $ (4.31) $ 9/10/2024 Tu 18 36.81$ 18.55 682 89 $ 557.80 $ 1,240.68 $ 0.277 0.17 13.34 $ (1.98) $ 9/10/2024 Tu 19 51.47$ 17.13 881.76 $ 515.10 $ 1,396.86 $ 0.086 0.05 4.14 $ 0.16 $ 9/10/2024 Tu 20 53.22$ 15.51 825.48 $ 466.39 $ 1,291.87 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 21 43.89$ 14.68 644 36 $ 441.43 $ 1,085.78 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 22 41.58$ 12.93 537 60 $ 388.81 $ 926.41 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 23 40.32$ 11.52 464.43 $ 346.41 $ 810.84 $ 0.000 0.00 - $ - $ 9/10/2024 Tu 24 38.41$ 10.22 392 51 $ 307.32 $ 699.83 $ 0.000 0.00 - $ - $ 3.20 21.99 $ 20.62 $ (1.37) $ (55 35) $ 9/11/2024 We 1 33.57$ 9.45 317 23 $ 284.16 $ 601.39 $ 0.000 0.00 - $ - $ 9/11/2024 We 2 33.41$ 9.12 304.72 $ 274.24 $ 578.96 $ 0.000 0.00 - $ - $ 9/11/2024 We 3 33.55$ 8.91 298 90 $ 267.92 $ 566.83 $ 0.000 0.00 - $ - $ 9/11/2024 We 4 33.22$ 8.94 296 97 $ 268.83 $ 565.80 $ 0.000 0.00 - $ - $ 9/11/2024 We 5 34.18$ 9.02 308 34 $ 271.23 $ 579.57 $ 0.000 0.00 - $ - $ 9/11/2024 We 6 36.17$ 9.55 345.42 $ 287.17 $ 632.59 $ 0.000 0.00 - $ - $ 9/11/2024 We 7 36.31$ 10.3 374 02 $ 309.72 $ 683.74 $ 0.000 0.00 - $ - $ 9/11/2024 We 8 33.29$ 11.06 368 23 $ 332.57 $ 700.80 $ 0.041 0.03 1 97 $ (0.38) $ 9/11/2024 We 9 18.31$ 11.66 213.47 $ 350.62 $ 564.09 $ 0.225 0.14 10.86 $ (4.17) $ 9/11/2024 We 10 18.65$ 12.2 227 50 $ 366.85 $ 594.35 $ 0.412 0.25 19.84 $ (7.53) $ 9/11/2024 We 11 19.82$ 13.25 262 65 $ 398.43 $ 661.08 $ 0.550 0.34 26.46 $ (9.65) $ 9/11/2024 We 12 16.96$ 13.58 230 26 $ 408.35 $ 638.61 $ 0.636 0.39 30.59 $ (12.27) $ 9/11/2024 We 13 15.32$ 14.16 216 88 $ 425.79 $ 642.67 $ 0.680 0.42 32.73 $ (13.82) $ 9/11/2024 We 14 16.82$ 14.61 245.75 $ 439.32 $ 685.07 $ 0.681 0.42 32.77 $ (13.20) $ 9/11/2024 We 15 18.99$ 15.06 285 99 $ 452.85 $ 738.84 $ 0.638 0.39 30.73 $ (11.53) $ 9/11/2024 We 16 18.74$ 15.46 289.75 $ 464.88 $ 754.63 $ 0.557 0.34 26.80 $ (10.14) $ 9/11/2024 We 17 23.09$ 15.54 358 89 $ 467.29 $ 826.18 $ 0.434 0.27 20.88 $ (6.75) $ 9/11/2024 We 18 34.05$ 15.04 512 06 $ 452.25 $ 964.32 $ 0.265 0.16 12.77 $ (2.34) $ 9/11/2024 We 19 42.08$ 14.24 599 26 $ 428.20 $ 1,027.46 $ 0.081 0.05 3 90 $ (0.32) $ 9/11/2024 We 20 47.78$ 13.79 658 93 $ 414.67 $ 1,073.60 $ 0.000 0.00 - $ - $ 9/11/2024 We 21 40.46$ 13.13 531 24 $ 394.82 $ 926.06 $ 0.000 0.00 - $ - $