19 development assumptions were evaluated through the Ukiah 2040 General Plan EIR and do not constitute new land use impacts not previously analyzed.
Noise
The Ukiah 2040 General Plan EIR evaluated airport-related noise exposure (Impact NOI-3) and concluded that continued implementation of applicable state and federal aviation regulations, together with the UKIALUCP, would minimize noise-related impacts. Portions of the project area are located within the Airport Influence Area; however, the project area is generally located outside the 55 dB CNEL contour associated with the Ukiah Municipal Airport.
The proposed Ordinance does not introduce land uses or development intensities beyond those previously evaluated in the General Plan EIR. No new noise impacts have been identified that were not previously analyzed through prior environmental review.
Public Services
The Ukiah 2040 General Plan EIR evaluated impacts associated with parks, recreational facilities, and public services, including implementation of trail and recreation improvements throughout the City (Impact PSR-3). The EIR concluded that impacts associated with expansion of recreational facilities would be less than significant.
The proposed Recreation (REC) zoning district implements the Recreational land use designation established by the General Plan and provides a zoning framework for recreational facilities, trails, and trail-support amenities previously contemplated by the General Plan. No new public service impacts have been identified that were not previously analyzed through the General Plan EIR.
Traffic
Previous environmental documents, including the 2012 Downtown Zoning Code MND, the 2012 Courthouse EIR, and the Ukiah 2040 General Plan EIR, evaluated transportation impacts associated with development within the project area. The Courthouse EIR identified impacts at the US-101 Northbound Ramp/Perkins Street intersection and adopted Mitigation Measure 4.10- 2 requiring fair-share participation in future transportation improvements.
The proposed rezoning of Perkins Street corridor properties to Community Commercial (C-1) and courthouse-related parcels to Public Facilities (PF) does not increase residential density beyond the levels analyzed in the Downtown Zoning Code MND or the Ukiah 2040 General Plan EIR. In addition, properties proposed for Public Facilities (PF) and Recreation (REC) zoning are no longer available for mixed-use residential development assumed under portions of the Downtown Zoning Code.
The expansion of the Downtown Zoning Code to Oak Street and Seminary Avenue applies development standards previously evaluated through the 2012 Downtown Zoning Code MND.
The General Urban district and associated development standards were analyzed as part of the Downtown Zoning Code environmental review.
20 Accordingly, the transportation impacts associated with development in the project area have previously been analyzed through applicable environmental documents, and the proposed Ordinance does not create transportation impacts that were not previously evaluated.
Wildfire
The Ukiah 2040 General Plan EIR evaluated wildfire hazards associated with future development within the City. Since certification of the General Plan EIR, the City has adopted Ordinance No. 1256 and updated Ukiah City Code Section 5200 to incorporate current Fire Hazard Severity Zone mapping and applicable fire safety standards.
Future development facilitated by the proposed Ordinance remains subject to applicable provisions of the California Building Code, Public Resources Code Sections 4290 and 4291, and the City's adopted fire hazard regulations. The proposed Ordinance does not create wildfirerelated impacts beyond those previously analyzed through the General Plan EIR and applicable regulatory programs.
4. Cumulative Impacts
Finding: There are no potentially significant offsite and/or cumulative impacts that the Ukiah 2040 EIR failed to evaluate.
Discussion: The General Plan EIR analyzed cumulative impacts for all resource areas.
Traffic
The 2012 MND identified the US-101/Perkins Street ramp intersections as operating at unacceptable levels and adopted a mitigation measure requiring future development to contribute fair share payments toward signalization and improvements. The 2040 General Plan EIR also analyzed VMT and traffic impacts. The rezoning to C-1 does not increase the trip generation potential beyond what was analyzed in the 2012 MND or the 2040 General Plan EIR, because the applicable residential density ranges remain within those evaluated in the 2012 DZC MND and the Ukiah 2040 General Plan EIR.
Airport Operations
The cumulative effects of development within the Airport Influence Area were evaluated through the Ukiah Municipal Airport Land Use Compatibility Plan (UKIALUCP) and the Ukiah 2040 General Plan EIR. Future development within the project area remains subject to the compatibility requirements, density limitations, and operational standards established by the UKIALUCP. The proposed zoning amendments do not establish land uses or development intensities beyond those previously evaluated through the UKIALUCP and the General Plan EIR. Accordingly, no cumulative airport compatibility impacts have been identified that were not previously analyzed.
5. New Information
Finding: There is no substantial new information that results in more severe environmental impacts than anticipated by the Ukiah 2040 EIR.
21 Discussion: No substantial new information has emerged since the certification of the Ukiah 2040 General Plan EIR in December 2022 that results in more severe impacts. The 2022 Courthouse EIR Addendum provides new information confirming that impacts related to the courthouse site (density, cultural resources, hazards) are less severe than previously analyzed.
The 2012 MND provides historical context for the DZC area, confirming that the high-density mixed-use concept was environmentally cleared. The proposed zoning amendments modify zoning classifications within the framework of land use designations established by the Ukiah 2040 General Plan and do not result in development intensities exceeding those evaluated through prior environmental review.
V. ALTERNATIVES
The following alternatives are not analyzed pursuant to CEQA Guidelines Section 15126.6, as this document is not an EIR. Instead, they are evaluated solely to confirm that each potential policy outcome remains within the scope of impacts previously analyzed in the Ukiah 2040 General Plan EIR and related environmental documents, consistent with CEQA Guidelines Section 15183.
Alternative 1: No Project
Under this alternative, no amendments to the Downtown Zoning Code (DZC) or General Plan would occur. Existing zoning designations, including the application of DZC (General Urban, Urban Center, and Downtown Core) regulations along the Perkins Street corridor and adjacent areas, would remain in effect.
This alternative would maintain the existing regulatory framework and development assumptions analyzed in the 2012 DZC Mitigated Negative Declaration and the Ukiah 2040 General Plan EIR.
Alternative 2: Proposed DZC
This alternative modifies the rezoning footprint of the Project by retaining Downtown Zoning Code (DZC) regulations on parcels located west of the Northwestern Pacific railroad tracks, while implementing the proposed rezoning east of the tracks. Specifically:
• All parcels along Perkins Street west of the railroad tracks would remain subject to DZC zoning (Urban Center and General Urban). These areas include parcels developed with both traditional downtown building forms (e.g., structures located at or near the street frontage) and parcels with existing development patterns that include deeper setbacks and on-site parking configurations. Retaining DZC zoning in these areas would continue to apply form-based development standards, including frontage, siting, and streetscape requirements consistent with the existing regulatory framework analyzed in the 2012 DZC MND.
• Parcels located east of the railroad tracks, including the East Perkins Street corridor and the rail corridor/Depot area, would be rezoned as proposed under the Project to Community Commercial (C-1), Public Facilities (PF), and Recreation (REC), consistent with the applicable General Plan land use designations.
22 This alternative does not introduce new or peculiar environmental effects. Retention of DZC zoning on western parcels maintains the previously analyzed regulatory baseline, while the rezoning of eastern parcels remains consistent with the density and land use assumptions evaluated in the Ukiah 2040 General Plan EIR and prior environmental documents. These relationships are reflected in the comparative zoning framework described in Tables 1 through 3 above.
Finding: The alternatives described above remain within the scope of environmental impacts previously analyzed in the Ukiah 2040 General Plan EIR and related environmental documents.
Discussion: Both alternatives remain within the range of development densities, land use designations, and regulatory frameworks evaluated through prior environmental review. The No Project Alternative retains the existing DZC regulatory framework. Alternative 2 retains DZC zoning on western parcels and applies the proposed rezoning to eastern parcels. As demonstrated in Table 1 (Zoning Realignments), Table 2 (Density Standards), and Table 3 (Land Use Allowances), the applicable zoning districts under both alternatives do not exceed previously analyzed density thresholds or introduce land uses beyond those evaluated in the Ukiah 2040 General Plan EIR and the 2012 DZC MND.
Neither alternative introduces new physical development beyond that previously analyzed. Site conditions and applicable regulations remain unchanged. Accordingly, neither alternative results in new or peculiar environmental effects.
VI. DETERMINATION
In accordance with CEQA Guidelines Section 15183, the Downtown Zoning Code (DZC) Amendments and Rezoning qualify for streamlined environmental review pursuant to CEQA Guidelines Section 15183 because the following findings are supported by substantial evidence in the record:
1. The project is consistent with the development density established by existing zoning, community plan or general plan policies for which an EIR was certified.
2. There are no project-specific effects which are peculiar to the project or its site, and which the Ukiah 2040 EIR failed to analyze as significant effects.
3. There are no project-specific impacts which the Ukiah 2040 EIR failed to analyze as significant effects.
4. There are no potentially significant offsite and/or cumulative impacts that the Ukiah 2040 EIR failed to evaluate.
5. There is no substantial new information that results in more severe impacts than anticipated by the Ukiah 2040 EIR.
Therefore, the City Council relies upon the EIR previously certified for the Ukiah 2040 General Plan, and further CEQA review is limited pursuant to CEQA Guidelines Section 15183 and Public Resources Code Section 21083.3.
July 15, 2026t
Comment Letter for City Council Meeting (July 15, 2026)-Item 13b: Amendment and Rezoning of Parcels Within and Adjacent to the City of Ukiah's Downtown Zoning Code Boundary including Drive-thrus.
Mayor Sher and City Council members,
Will the city’s planned revision of the Downtown Zoning Code (DZC) with the elimination of Gibson Creek from the map and text describing it improve the urban landscape? No. proposed code changes are in conflict with our General Plan. The city has failed in providing opportunities for protecting our waterways. The new document strategically drops all previous language that calls for its protection and enhancement in the DZC. The city has yet to mitigate its impaired waterways with one exception, the creation of the purple pipe.
GP 2010 and 2040 have an abundance of language stating policies for protecting waterways. The city contracted with LSA Associates, Inc to study the Gibson Creek corridor and produced the Gibson Creek Habitat Enhancement and Public Access Study in September 2000. Twenty-six years later nothing has been implemented. Since there is no interest in prioritizing Gibson Creek, protecting and enhancing it, obtaining grant funding, budgeting for a capital improvement project and implementing the recommendations one becomes skeptical. In the current 2040 GP, ENV 6.1 it states, “the city shall establish a creek and stream restoration master plan for each creek flowing through the city limits.” With a timeline for its implementation of 2026-2030 but the planning director said it won’t be until 2030. Given this reality, its’s imperative that Gibson Creek continue to be identified on this new map and its language maintained in the revised ordinance.
The DZC’s Initial Environmental Study and Mitigated Negative Declaration of June 2012 the mitigated measures states, “future development projects and construction activities near the Gibson Creek Corridor include a 50’ building setback from the edge of the Gibson Creek riparian corridor. The city wishes to eliminate this requirement.
Historically, the city has neglected and abused its waterways within its boundaries and has been sued many times for it despite the goals and policies in both GPs. It’s not just the public expression from the six-year DZC effort but also from the courthouse environmental scoping EIR. People came out and spoke up for Gibson Creek’s protection for the migrating wildlife using the corridor including protected fish. The late Bill Townsend and other Ukiah Rod and Gun Club members, the late Phil Baldwin, the late Bill Randloph, the Mendocino Fisheries Program, Friends of Gibson Creek, and the former city of Ukiah’s Paths, Open Space and Creeks Commission all have worked and volunteered to benefit creeks and the river within the city. The public have repeatedly expressed that city creeks, particularly Gibson Creek be protected and stewarded.
The Gibson Creek corridor will not be enhanced and protected with this new ordinance.
Eliminating drive-thru language in the DZC is counter-productive. Drive-thrus are magnets of traffic and congestion. The combination of tight spaces, multi-lane queues, distracted drivers converging onto public streets leads to frequent fender-benders, sideswipes, and pedestrian accidents. Increasing opportunities for drive-thrus on Perkins Street is bad public policy that was already debated years ago during the codes creation.
On July 1. 2025 the city received $323,500 from Caltrans for a Sustainable Transportation Planning Grant for the East Perkins Multimodal Transportation Plan. Included in the city’s application to Caltrans was the 2024 Transit Feasibility Study. The study states, “14,000 motorist per day use Perkins Street.” It also stated, “East Perkins Street includes some of the most significant high collision and high injury intersection and roadway segments in the city…due to unsafe speed and improper turning.” Correspondence Received for Agenda Item 13b
Additionally, drive-thrus economically impact and degrade historic downtowns because they disrupt pedestrian flow and stifle surrounding foot traffic. The auto-centric model drains local economic vitality by pushing drivers out of the area immediately after their transaction rather than encouraging them to explore neighboring businesses, like State and School Streets.
The DZC process began in 2006 and was completed in 2012. The city spent thousands of dollars on it. Lois Fisher and Laurel Hall were paid over $100,000.00 for community engagement, illustrations and a plan. They invited the community’s feedback in a charrette format. Fisher and Hall asked the public what they wanted to see and experience in their downtown. The charrette was publicized, well-attended with enthusiastic participation. The Planning Commission spent eighteen months debating and analyzing the pros and cons of design, use/reuse of buildings, development standards and circulation and parking. Planning staff then crafted hundreds of pages from these meetings into a workable code. On April 27, 2011 Mayor Rodin and another council member met with planning commissioners in a joint public workshop. This was followed by the 2012 completion and adoption of the environmental document.
Currently, the Ad-hoc Committee (Doug Crane and Mari Rodin) met with the Planning Department to remove DZC requirements for the Perkins Street Corridor from Main Street to the overpass. These changes were then submitted to the Planning Commission at their 5/27 and 6/10 meeting that passed in a 3.0 vote, absent two commissioners.
The public has given their valuable time and tax dollars to the DZC’s creation. Please demonstrate your respect and support. Empty buildings on East Perkins Street and East Standley Street are due to a myriad of reasons that have little to do with the loss of redevelopment funds and the recession. Erasing every reference of Gibson Creek from the document denies that a creek runs through the area. The GP is not enough to protect this waterway and the DZC as was adopted in 2012 strengthens creek protection. Further relaxation of the drive-thru design on Perkins Street benefits commercial interests over the safety of the traveling public. Both are significant policy changes that benefit a few over the many.
Thank you for your time and attention,
Linda Sanders
Ukiah resident
Correspondence Received for Agenda Item 13b
Agenda Item No: 14.a.
MEETING DATE/TIME: 7/15/2026
ITEM NO: 2026-1227
AGENDA SUMMARY REPORT
SUBJECT: Resolve Bid Protest Received for Specification No. 26-01, Capital Pavement Program:
Preservation and Overlay Project, Approve Final Award Recommendation, and Approve Corresponding Budget Amendment.
DEPARTMENT: Public Works PREPARED BY: Myles Fisette, Purchasing Manager PRESENTER: Myles Fisette, Purchasing Manager and Tim
Eriksen, Public Works Director/City Engineer
ATTACHMENTS:
1. Staff Report - 5-6-26
2. Granite Construction Company Bid
3. Ghilotti Construction Company Bid
4. Bid Tabulation Spec 26-01 Capital Pavement Program Preservation and Overlay
5. Ghilotti Protest - Spec No. 26.01
6. Specification No. 9-1.18A
7. 26-01 Preservation Program Ukiah Protest Response Granite 06.29.26
8. Memo re Ghilotti bid protest
9. 14a Correspondence Received - Ghilotti Construction Company Summary: Council will consider and decide the bid protest submitted by Ghilotti Construction Company regarding the apparent low bid submitted by Granite Construction Company for Specification No. 26-01, Capital Pavement Program: Preservation and Overlay Project. Following consideration of the protest, Council will make a final determination based on the evidence and arguments presented, including Staff's recommendation to deny the protest, waive the bid irregularity, and award the construction contract to Granite Construction Company in the amount of $870,470. Council will also consider approving a corresponding budget amendment.
Background: On May 6, 2026, the City Council approved the plans and specifications for the Capital Pavement Program: Preservation and Overlay Project and directed Staff to advertise for bids (Attachment 1).
The project includes roadway rehabilitation on Talmage Road, Waugh Lane, and Mendocino Place through asphalt grind and overlay, ADA curb ramp improvements, drainage improvements, utility improvements, and pavement striping. Funding for the project is provided through the California Transportation Commission Local Partnership Program Formulaic Funds and Senate Bill 1 Road Repair and Accountability Act funds.
Discussion: On June 23, 2026, bids were publicly opened with five bidders responding. Granite Construction Company submitted the apparent low bid of $870,470 (Attachment 2), followed by Ghilotti Construction Company with a bid of $910,709 (Attachment 3). A copy of the bid tabulation is included as Attachment 4.
On June 24, 2026, Ghilotti Construction Company submitted a timely bid protest (Attachment 5) asserting that Granite Construction Company's bid should be rejected as nonresponsive because its bid amount for Mobilization, Demobilization and Final Cleanup exceeded the 2.5% limitation contained in Section 9-1.18A (Attachment 6) of the project specifications.
On June 29, 2026, Granite Construction Company submitted a written response (Attachment 7) requesting
that the protest be denied and that the City proceed with award of the contract. Granite asserted that the mobilization bid item did not affect its total bid price, scope of work, or contractual obligations, and that the deviation constituted an immaterial irregularity that did not provide a competitive advantage or affect the outcome of the competitive bidding process.
The City Attorney reviewed the protest and response and concluded that although Granite's bid exceeded the
2.5% limitation contained in the specifications, the deviation constitutes a waivable irregularity under California competitive bidding law because it did not provide Granite with an unfair competitive advantage or otherwise affect the integrity of the competitive bidding process (Attachment 8).
Granite Construction Company's bid of $870,470 is $40,239 lower than the second-lowest bid submitted by Ghilotti Construction Company. Awarding the contract to Granite Construction Company will result in the lowest construction cost to the City while allowing the project to proceed during the 2026 construction season.
Based on its review of the bid protest, Granite Construction Company's response, and the City Attorney's legal analysis, Staff recommends rejecting the bid protest received from Ghilotti Construction Company, waiving the irregularity in Granite Construction Company's bid, and awarding the contract to Granite Construction Company, the lowest responsive and responsible bidder, in the amount of $870,470 for Specification No. 26- 01, Capital Pavement Program: Preservation and Overlay Project. The City Council should make its decision based on the evidence and arguments presented during the hearing, including the protest, Granite Construction Company's response, the City Attorney's memorandum, and Staff's recommendation.
A corresponding budget amendment in the amount of $957,517 is requested to reflect the awarded construction contract amount plus a 10% contingency. A budget amendment is also requested to recognize up to $400,000 in reimbursement revenue from the California Transportation Commission Local Partnership Program Formulaic Funds (CTC LPP), which will partially offset project costs.
Recommended Action: Consider the bid protest submitted by Ghilotti Construction Company, adopt findings proposed by the City Attorney; reject the protest, waive the bid irregularity in Granite Construction Company's bid, award the contract for Specification No. 26-01, Capital Pavement Program: Preservation and Overlay Project to the lowest responsible bidder, Granite Construction Company, in the amount of $870,470, and approve corresponding budget amendment.
BUDGET AMENDMENT REQUIRED: YES
CURRENT BUDGET AMOUNT: 50024620.80230.18541: $0; 50024620.43179.18541: $0 PROPOSED BUDGET AMOUNT: 50024620.80230.18541: $957,517; 50024620.43179.18541 (CTC LPP Funds): -$400,000
FINANCING SOURCE: California Transportation Commission Local Partnership Program Formulaic, SB1 2017 Road Repair Act Funds
REVENUE: No GRANT: No
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: Tim Eriksen, Public Works Director; Andrew Sticklin, Senior Engineer; Seth Strader, Management Analyst II; Mary Horger, Assistant Finance Director STRATEGIC PLAN (SP): SP 2B - Identify and/or develop funding for essential and vital infrastructure for the long-term.
GENERAL PLAN ELEMENTS (GP): GP-A4 - Public Facilities, Services, and Infrastructure Element.
Agenda Item No: 14.b.
MEETING DATE/TIME: 5/6/2026
ITEM NO: 2026-632
AGENDA SUMMARY REPORT
SUBJECT: Approval of Plans and Specifications for the Capital Pavement Program: Preservation and Overlay, Specification 26-01, and Direct Staff to Advertise for Bids.
DEPARTMENT: Public Works PREPARED BY:Andrew Stricklin, Senior Civil Engineer PRESENTER:Tim Eriksen, Public Works Director/City Engineer ATTACHMENTS:
1. Plans and Specifications
2. Adopting SB 1 FY 25-26 Projects
Summary: Council will consider approving the plans and specifications for the Capital Pavement Program:
Preservation and Overlay (CPPPO), Specification 26-01, and direct Staff to advertise for bids. This project includes asphalt grind and overlay on segments of three roads including Talmage Road, Waugh Lane and Mendocino Place. Work includes necessary ADA curb ramp improvements as required, striping and storm drain modification.
Background: This project is meant to rehabilitate sections of three different roads with an asphalt overlay. Talmage Road will be paved from State Street east to the Great Redwood Trail and create bike lanes in both directions to make a connection from the new bike lanes on State Street to the trail. Further sidewalk and pedestrian improvements are planned for anticipated undergrounding of electric utilities that will be designed at a later project. Waugh Lane will be paved from Talmage Road north approximately 740 feet. Work will include construction of two ADA curb ramps at the corner of Talmage Road and Waugh Lane. Mendocino Place will be paved from Mendocino Drive to the end of the cul-de-sac and include construction of two ADA curb ramps with improved pedestrian visibility and storm drain modification. (See Attachment 1.)
Discussion: Engineering staff has applied for funding through the California Transportation Commission (CTC) Local Partnership Program, which will reimburse $400,000.00 of the project's total cost. This grant requires a local match of 50% which will be paid using The Road and Repair Accountability Act (SB1) funding (Attachment 2). The engineer's estimate for total construction is $800,000 including 10% contingency. With Council approval of plans and specifications, Staff will complete an allocation request for funds from the CTC. If Council approves the plans and specifications and directs Staff to advertise for bids, Staff plans to release the project for bids in late May 2026 with anticipated construction and completion in summer 2026.
Recommended Action: Approve Plans and Specifications for the Capital Pavement Program: Preservation and Overlay, Specification 26-01, and direct Staff to advertise for bids.
BUDGET AMENDMENT REQUIRED: Not at this time
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: CTC LPP Formulaic, SB1 2017 Road Repair Act Funds REVENUE: No GRANT: Yes
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: Tim Eriksen, Public Works Director, Seth Strader, Management Analyst II ATTACHMENT 1
STRATEGIC PLAN (SP): SP 2B - Identify and/or develop funding for essential and vital infrastructure for the long-term.
GENERAL PLAN ELEMENTS (GP):GP-A3 - Mobility Element
ATTACHMENT 2
ATTACHMENT 3
Item # Description UOM QTY Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total 1 Mobilization, Demobilization and Final Cleanup LS 1 $71,000.85 $71,000.85 $20,000.00 $20,000.00 $42,000.00 $42,000.00 $25,000.00 $25,000.00 $30,000.00 $30,000.00 2 Traffic Control LS 1 $18,000.00 $18,000.00 $27,000.00 $27,000.00 $82,000.00 $82,000.00 $101,945.30 $101,945.30 $92,022.25 $92,022.25 3 Construction Survey LS 1 $9,920.00 $9,920.00 $11,000.00 $11,000.00 $9,920.00 $9,920.00 $9,920.00 $9,920.00 $10,000.00 $10,000.00 4 Remove Concrete (Curb and Gutter) LF 215 $16.00 $3,440.00 $25.00 $5,375.00 $44.00 $9,460.00 $64.00 $13,760.00 $35.00 $7,525.00 5 Remove Concrete (Sidewalk and Ramps) SF 1036 $3.40 $3,522.40 $10.00 $10,360.00 $11.00 $11,396.00 $10.50 $10,878.00 $10.00 $10,360.00 6 Cold Plane Asphalt 3" SF 72020 $0.49 $35,289.80 $0.65 $46,813.00 $0.50 $36,010.00 $0.80 $57,616.00 $1.10 $79,222.00 7 Conform Grind SF 3123 $1.65 $5,152.95 $1.00 $3,123.00 $0.50 $1,561.50 $1.90 $5,933.70 $2.00 $6,246.00 8 Adjust Valve/Cleanout EA 21 $1,500.00 $31,500.00 $1,900.00 $39,900.00 $1,700.00 $35,700.00 $1,500.00 $31,500.00 $1,100.00 $23,100.00 9 Adjust Manhole EA 13 $2,400.00 $31,200.00 $2,000.00 $26,000.00 $2,600.00 $33,800.00 $2,600.00 $33,800.00 $1,900.00 $24,700.00 10 Hot Mix Asphalt TON 1378 $209.00 $288,002.00 $215.00 $296,270.00 $210.00 $289,380.00 $233.00 $321,074.00 $227.00 $312,806.00 11 Minor Concrete (Curb and Gutter) LF 264 $53.00 $13,992.00 $95.00 $25,080.00 $54.00 $14,256.00 $57.00 $15,048.00 $73.00 $19,272.00 12 Minor Concrete (Driveway) SF 393 $27.00 $10,611.00 $20.00 $7,860.00 $17.00 $6,681.00 $17.50 $6,877.50 $23.00 $9,039.00 13 Minor Concrete (Sidewalk) SF 985 $12.00 $11,820.00 $15.00 $14,775.00 $16.50 $16,252.50 $17.25 $16,991.25 $22.00 $21,670.00 14 Minor Concrete (Curb Ramp) EA 4 $2,000.00 $8,000.00 $3,300.00 $13,200.00 $2,800.00 $11,200.00 $3,750.00 $15,000.00 $5,000.00 $20,000.00 15 Minor Concrete (Cobble-Non-Walkable Surface) SF 187 $28.00 $5,236.00 $35.00 $6,545.00 $39.50 $7,386.50 $41.50 $7,760.50 $25.00 $4,675.00 16 Class 2 Aggregate Base (Sidewalk Only) CY 56 $360.00 $20,160.00 $275.00 $15,400.00 $360.00 $20,160.00 $306.00 $17,136.00 $444.00 $24,864.00 17 Domestic Water Main (6-Inch, PC235) LF 415 $110.00 $45,650.00 $165.00 $68,475.00 $162.00 $67,230.00 $169.00 $70,135.00 $385.00 $159,775.00 18 Domestic Water Service (1-Inch) Meter (3/4-Inch) EA 8 $4,900.00 $39,200.00 $5,800.00 $46,400.00 $5,000.00 $40,000.00 $6,950.00 $55,600.00 $7,000.00 $56,000.00 19 Fire Hydrant and Lateral Assembly (4-Inch) EA 1 $20,000.00 $20,000.00 $14,900.00 $14,900.00 $16,000.00 $16,000.00 $15,906.00 $15,906.00 $21,000.00 $21,000.00 20 Tie-In Existing 4" & 6" Water Main EA 2 $11,000.00 $22,000.00 $13,600.00 $27,200.00 $14,000.00 $28,000.00 $15,700.00 $31,400.00 $9,500.00 $19,000.00 21 Pothole Existing Utilities LS 1 $23,000.00 $23,000.00 $28,000.00 $28,000.00 $9,000.00 $9,000.00 $23,000.00 $23,000.00 $55,000.00 $55,000.00 22 Abandonment of Existing Water Main LS 1 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $9,000.00 $9,000.00 $905.00 $905.00 $6,000.00 $6,000.00 23 Storm Drain Curb Inlet EA 1 $5,700.00 $5,700.00 $5,900.00 $5,900.00 $9,000.00 $9,000.00 $6,000.00 $6,000.00 $7,500.00 $7,500.00 24 Storm Drain Manhole (48-Inch) EA 1 $16,500.00 $16,500.00 $5,900.00 $5,900.00 $15,000.00 $15,000.00 $8,000.00 $8,000.00 $9,500.00 $9,500.00 25 Remove & Replace Storm Drain Pipe (18-Inch ADA N12) LF 530 $113.00 $59,890.00 $165.00 $87,450.00 $154.00 $81,620.00 $230.00 $121,900.00 $323.00 $171,190.00 26 Modify Existing Storm Drain Manhole EA 2 $3,600.00 $7,200.00 $1,900.00 $3,800.00 $2,900.00 $5,800.00 $2,000.00 $4,000.00 $3,500.00 $7,000.00 27 Remove Existing Drainage Inlet LS 1 $1,500.00 $1,500.00 $1,200.00 $1,200.00 $2,900.00 $2,900.00 $2,300.00 $2,300.00 $3,000.00 $3,000.00 28 Remove Existing Storm Drain Manhole EA 2 $1,650.00 $3,300.00 $1,200.00 $2,400.00 $1,500.00 $3,000.00 $2,600.00 $5,200.00 $1,600.00 $3,200.00 29 Traffic Stripe (Detail 22) LF 1123 $5.00 $5,615.00 $5.00 $5,615.00 $8.00 $8,984.00 $8.00 $8,984.00 $8.00 $8,984.00 30 Traffic Stripe (Detail 39) LF 1514 $4.00 $6,056.00 $4.00 $6,056.00 $2.00 $3,028.00 $2.00 $3,028.00 $2.00 $3,028.00 31 Traffic Stripe (Detail 39A) LF 117 $4.00 $468.00 $4.00 $468.00 $2.00 $234.00 $2.00 $234.00 $2.00 $234.00 32 Traffic Stripe (Detail 38) LF 88 $6.00 $528.00 $6.00 $528.00 $3.00 $264.00 $3.00 $264.00 $3.00 $264.00 33 Thermoplastic Stripe (4-Inch White) LF 845 $4.00 $3,380.00 $4.00 $3,380.00 $1.75 $1,478.75 $1.75 $1,478.75 $1.75 $1,478.75 34 Thermoplastic Crosswalk (White) SF 149 $6.00 $894.00 $6.00 $894.00 $14.00 $2,086.00 $14.00 $2,086.00 $14.00 $2,086.00 35 Thermoplastic Pavement Marker (Bike & Arrow) EA 6 $250.00 $1,500.00 $250.00 $1,500.00 $250.00 $1,500.00 $250.00 $1,500.00 $250.00 $1,500.00 36 Thermoplastic Pavement Marker (Sharrow) EA 2 $350.00 $700.00 $350.00 $700.00 $200.00 $400.00 $200.00 $400.00 $200.00 $400.00 37 Thermoplastic Pavement Marker (Green Bike Lane) SF 100 $25.00 $2,500.00 $25.00 $2,500.00 $20.00 $2,000.00 $20.00 $2,000.00 $20.00 $2,000.00 38 Thermoplastic Pavement Marker (Type IV Arrow) EA 4 $200.00 $800.00 $200.00 $800.00 $200.00 $800.00 $200.00 $800.00 $200.00 $800.00 39 Thermoplastic Pavement Marker (Parking Tee) SF 24 $34.00 $816.00 $34.00 $816.00 $14.00 $336.00 $14.00 $336.00 $14.00 $336.00 40 Thermoplastic Pavement Marker (STOP - White) SF 44 $14.00 $616.00 $14.00 $616.00 $14.00 $616.00 $14.00 $616.00 $14.00 $616.00 41 Remove/Replace Sign Post EA 3 $650.00 $1,950.00 $650.00 $1,950.00 $400.00 $1,200.00 $400.00 $1,200.00 $400.00 $1,200.00 42 Fire Hydrant Retroreflective Marker EA 2 $30.00 $60.00 $30.00 $60.00 $35.00 $70.00 $35.00 $70.00 $35.00 $70.00 43 Asphalt Concrete 9-inch Digout CY 60 $530.00 $31,800.00 $325.00 $19,500.00 $650.00 $39,000.00 $968.00 $58,080.00 $777.00 $46,620.00 Sub: Work: Sub: Work: Sub: Work: Sub: Work: Sub: Work:
Stiping Graphics Striping Pavement Recycling Systems Grinding Anrak Corp Asphalt Grinding Chrisp Company Stripe & Sign Chrisp Company Striping Striping Graphics Striping Chrisp Company Striping, marking, markers, signs Pavement Recycling System, Inc Cold Plane Pacific Northwest Oil Tack Oil Application Greg Nelson Construction Minor Concrete Devincenzi Concrete
Construction
Concrete Pacific Northwest Oil Tack Oil
Cinquini & Passarino Inc Survey
Bid Results - Spec 26-01 Capital Pavement Program Preservation and Overlay BID OPENING: 2 PM, June 23, 2026
PETALUMA, CA
$1,115,663.00 $1,283,283.00
GHILOTTI BROS
SAN RAFAEL, CA
GRANITE CONTRUCTION
UKIAH, CA
$870,470.00
TEAM GHILOTTI
TOTAL BID:
GHILOTTI CONSTRUCTION
SANTA ROSA, CA
$910,709.00
ARGONAUT CONSTRUCTORS
SANTA ROSA, CA
$975,710.25
Attachment 4
ATTACHMENT 5
C3PO Project 31 Spec No.26-01
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
Add to section 7-1.03:
The Contractor shall conduct operations so as to cause the least possible obstruction and inconvenience to public traffic and businesses. The Contractor shall, at his or her expense, furnish such flag persons and furnish, erect, construct and maintain such fences, barriers, lights, signs, detours, pedestrian walkways, driveway ramps and bridging as may be necessary to give adequate warning to the public that work is in progress and that dangerous conditions exist, to provide access to abutting properties and to permit the flow of pedestrian and vehicular traffic to safely and expeditiously pass through the work.
Add to section 7-1.04:
The Contractor shall comply with all pertinent provisions of the Department of Labor "Safety and Health Regulations for Construction (29 FCS Part 1518, 36 CFR 7340)", with additions or modifications thereto, in effect during construction of this project.
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
8 PROSECUTION AND PROGRESS
Add to section 8-1.02D(1):
Level 3 Critical Path Method (CPM) Progress schedule will be required for this contract and shall conform to the provisions in Section 8-1.02D, "Level 3 Critical Path Method Schedule," of the Standard Specifications. After baseline schedule is accepted by the Engineer, Contractor shall update and submit CPM schedule to Engineer for review every 2 calendar weeks. Progress schedule will be paid for as described in Section 8-1.02D(10).
Replace section 8-1.02E with:
The Engineer shall schedule, arrange and conduct progress meetings. These meetings shall be conducted once per week, or as mutually agreed by Contractor, City and Caltrans, and shall be attended by the Contractor’s superintendent and representatives of all subcontractors, utilities, and others, who are active in the execution of the Work. The purpose of these meetings shall be to review the Contractor’s CPM schedule, resolve conflicts, and in general, coordinate and expedite the execution of the Work. Engineer will make arrangements for meetings, prepare agenda with copies for participants, preside at meetings and record the meeting minutes.
Replace section 8-1.03 with:
A preconstruction conference will be held before any work will be allowed to commence. This meeting will cover inspection, work schedule, and among other items, the responsibilities and procedures of each of the interested parties to assure that the project will be completed in accordance with the contract documents. Engineer will prepare and distribute an agenda for the preconstruction conference.
Add to section 8-1.04B:
The Contractor shall obtain and pay for all permits required to complete this work except the required City of Ukiah encroachment permit for work within the City right-of-way. The Contractor shall obtain an encroachment permit from the City of Ukiah Public Works Department at no cost prior to the start of the Work. The encroachment permit will not be issued until the Contract Agreement and bonds have been executed, submitted, and accepted by the City and all insurance endorsements have been submitted to and accepted by the City’s Risk Manager.
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
9 PAYMENT
Add section 9-1.18:
9-1.18A Payment Item Descriptions
Payment for Mobilization, Demobilization and Final Cleanup will be made in two (2) equal payments at the lump sum (LS) allowance in the Bid Schedule, which price shall constitute full compensation for all such work. The ATTACHMENT 6
C3PO Project 32 Spec No.26-01
scope of work for mobilization shall include, but not limited to, obtaining all bonds, insurance and permits, moving onto the site of all plant and equipment, submittal and approval of a schedule of values for lump sum items, and obtaining approval for all shop drawings and materials for signal equipment. Payment for demobilization and final cleanup shall occur when all required items per the Contract are fulfilled and the site is free of equipment and clean and ready for use by the public. The bid amount for Mobilization, Demobilization and Final Cleanup items shall not exceed 2.5% of the total construction contract base bid price.
Full compensation for furnishing, placing, maintaining, and removing the Traffic Control will be paid for at the contract lump sum (LS) price, which price shall include furnishing all labor, materials, tools, equipment and incidentals for doing all work involved in furnishing traffic control system required for direction of public vehicular and pedestrian traffic through or around the work, including preparation and implementation of the traffic control plans, pedestrian routing plans, maintaining access to businesses, noticing, temporary facilities including temporary lighting, traffic control equipment, flaggers, signs, striping, walkways, plates, barriers, and temporary pavement marker tabs, and all other pedestrian and vehicular traffic control requirements as required or specified in these specifications.
Full compensation for Construction Survey will be measured and paid for at the contract lump sum price and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals for performing all work involved in establishing and maintaining vertical control and horizontal control, staking, and related construction surveying required to perform the Work, and no additional allowances will be made therefor.
Full compensation for Remove Concrete Curb and Gutter will be measured and paid for at the contract unit price per linear foot and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals for performing all work involved in the removal of existing concrete curb and gutter including but not limited to saw cutting, removal of concrete, sand and base rock, excavation, stockpiling removed materials, hauling and disposal of removed materials, and cleaning of materials, as specified in these Construction Details and shown on the Plans, and no additional allowances will be made therefor.
Full compensation for Remove Concrete Sidewalk, Driveways, and Curb Ramps will be measured and paid for at the contract unit price per square foot and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals for performing all work involved in the removal of existing concrete sidewalk, pedestrian ramps and driveways, including but not limited to saw cutting, removal of concrete, sand and base rock, excavation, stockpiling removed materials, hauling and disposal of removed materials, and cleaning of materials, as specified in these Construction Details and shown on the Plans, and no additional allowances will be made therefor.
Full compensation for Cold Plane Asphalt Concrete Paving will be measured and paid for at the contract unit price per square foot and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals for performing all work involved in the asphalt concrete cold planning, including but not limited to, removal of striping and markings within grind limits, lowering utility covers, excavation, stockpiling removed materials, hauling and disposal of removed materials, cleaning of materials furnishing, the asphalt concrete for and constructing, maintaining, removing and disposing of temporary asphalt concrete tapers and generally preparing surface for asphalt concrete pavement, as specified in these Construction Details, shown on the Plans, and directed by the Engineer and no additional allowances will be made therefor. All grinding of Talmage Road will be at night to avoid closing the road to business. Extra labor cost or material supply cost must be accounted for within the bid item and no additional allowance will be made.
Full compensation for Conform Grinding will be measured and paid for at the contract unit price per square foot and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals for performing all work involved in the asphalt concrete cold planning and grinding at conforms, including but not limited to, removal of striping and markings within conform grind limits, lowering utility covers, excavation, stockpiling removed materials, hauling and disposal of removed materials, cleaning of materials furnishing, the asphalt concrete for and constructing, maintaining, removing and disposing of temporary asphalt concrete tapers and generally preparing surface for asphalt concrete pavement, as specified in these Construction Details, shown on the Plans, and directed by the Engineer and no additional allowances will be made therefor.
Full compensation for Adjust Valve/Cleanout to Grade will be measured and paid for at the contract unit price per each and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals for performing all work involved in adjusting existing valve covers and sanitary sewer cleanout covers, to new finish grades, including but not limited to excavation, backfill, concrete, grade rings, debris platforms, cleaning, asphalt or
ATTACHMENT 7
Law Offices Of
RAPPORT AND MARSTON
An Association of Sole Practitioners
405 W. Perkins Street
Ukiah, California 95482
e-mail: [email protected]
David J. Rapport (707) 462-6846
Darcy Vaughn FAX 462-4235
M E M O R A N D U M
TO: Honorable Mayor and City Councilmembers
FROM: David J. Rapport, City Attorney
DATE: July 8, 2026
SUBJECT: Ghilotti Construction Company protest of low bid by Granite Construction _____________________________________________________________________________ On June 24, 2026, Ghilotti Construction Company filed a timely protest to awarding to Granite Construction, the low bidder, the contract for the Capital Pavement Program: Preservation and Overlay Progran – Specification No. 26-01.
I have been asked to provide legal advice concerning the protest hearing and the merits of the bid protest.
GHILOTTI PROTEST
Ghilotti bases its protest on Granite’s bid allegedly violating the requirement in Section 9-1.18A of the specifications that the bid amount for Mobilization, Demobilization and Final Cleanup items shall not exceed 2.5% of the total construction contract base bid price. Granite’s bid for Mobilization, Demobilization and Final Cleanup is $71,000.85. Its total bid is $870,470. The bid amount for Mobilization, Demobilization and Final Cleanup is approximately 8.15% of Granite’s total bid.
PROTEST HEARING
Upon receipt of a timely bid protest, in accordance with the instructions to bidders, the City Council is required to consider a timely bid protest and determine its merits. The City Council’s consideration of the bid protest is not subject to due process requirements. A due process hearing is only required if the protest is based on the qualification of the low bidder to perform the work. (D.H. Williams Construction, Inc. v. Clovis Unified School Dist. (2007) 146 Cal.App.4th 757, 763.). Where, as here, the protest is based on the assertion that the bid is not responsive, no due process hearing is required.
ISSUES TO BE ADDRESSED
ATTACHMENT 8
Memorandum to Mayor and Councilmembers Page 2
Subject: Ghilotti Construction bid protest
Date: July 8, 2926
It is undisputed that the amount Granite included in its bid for Mobilization, Demobilization and Final Cleanup (“M,D&FC”) exceeds the 2.5% limit in Specification Section 9-1.18A. In its written response to the bid protest, Granite argues that its bid is responsive, because Section 9-1.18A does not control the amount its bid provides for M.D&FC. It addresses how much the City will pay for that work.
The Ghilotti protest and Granite’s response present two issues:
1. Is Ghilotti’s bid responsive to the Request for Bids?
2. If not responsive, can the City Council waive the violation of Specification 9-1.18A and accept Granite’s bid?
ANALYSIS
1. Is Granite’s bid responsive?
Specification 9-1.18A provides in relevant part:
9-1.18A Payment Item Descriptions
Payment for Mobilization, Demobilization and Final Cleanup will be made in two (2) equal payments at the lump sum (LS) allowance in the Bid Schedule, which price shall constitute full compensation for all such work. . . . The bid amount for M.D & FC items shall not exceed 2.5% of the total construction contract base bid price.” While Granite is correct that the specification addresses payment, it does expressly require that the bid amount for M.D &FC not exceed 2.5% of the total construction contract base bid price.
If the City Council decides that the specification limits how much the bid can include for M.D.&FC, in deciding whether to reject the bid on this basis, it can consider Granite’s argument in determining whether or not to waive the requirement and accept Granite’s bid.
2. Can the City Council waive the requirement that the bid for M.D.&FC not exceed the
2.5% limit?
Cities are required to put significant contracts out for competitive bidding and to award the contract to the lowest responsible bidder submitting a responsive bid. (See, e.g., Pub. Contract Code, § 20162.)
An inconsequential deviation from the bidding requirements can be waived, if the deviation does not give the low bidder an unfair competitive advantage or the variance cannot have affected the
Memorandum to Mayor and Councilmembers Page 3
Subject: Ghilotti Construction bid protest
Date: July 8, 2926
amount of the bid. (DeSilva Gates Construction, LP v. Department of Transportation, (CA 3 2015) 242 Cal. App. 4th 1409, 1422-1423.)
An unfair competitive advantage could exist if the deviation would:
1. Allow the low bidder to bid less than the competing bidders; or
2. Allow the low bidder to withdraw its bid under Public Contract Code Section 5103 without forfeiting its bid bond. (MCM Construction, Inc. v. City and County of San Francisco (CA 1 1998) 66 Cal. App. 4th 359, 375, citing Valley Crest Landscape, Inc. v. City Council, 41 Cal.
App. 4th 1432.)
Since Granite is the low bidder even though its bid for M.D.&FC exceeded the 2.5% limit in Specification 9-1.18A, the deviation did not allow it to bid less than the competing bid from Ghilotti.
To withdraw its bid under Public Contract Code Section 5103, the bidder must establish that:
(a) A mistake was made.
(b) He or she gave the public entity written notice of the mistake within five working days of the bid opening.
(c) The mistake made the bid materially different than he or she intended it to be. (d) The mistake was made in filling out the bid and not due to error in judgment or to carelessness in inspecting the site of the work, or in reading the plans or specifications.
On its face exceeding the percentage limits in Specification 9-1.18A does not appear to be a mathematical error or error in filing out a bid form. It appears that Granite estimated its cost for M.D.&FC at $71,000.85. Accordingly, it could not withdraw its bid without penalty under Public Contract Code Section 5103.
Accordingly, the City Council could make findings that would warrant waving the nonconforming amount bid for M.D.&FC and award the bid to Granite as the low bidder. Granite argues that when it submits a payment request that includes M.D.&FC, in processing that request the 2.5% limit can be addressed and resolved. Any such resolution could lower, but is unlikely to increase, the amount payable to Granite under the contract. This further supports treating the M.D.&FC in Granite’s bid as an inconsequential deviation that does not give Granite an unfair competitive advantage over Ghilotti.
DRAFT FINDINGS:
1. Specification Section 9-1.18A provides, in part:
Payment for Mobilization, Demobilization and Final Cleanup will be made in two (2)
Memorandum to Mayor and Councilmembers Page 4
Subject: Ghilotti Construction bid protest
Date: July 8, 2926
equal payments at the lump sum (LS) allowance in the Bid Schedule, which price shall constitute full compensation for all such work. . . . The bid amount for Mobilization, Demobilization and Final Cleanup items shall not exceed 2.5% of the total construction contract base bid price.
2. Granite Construction’s bid of $71,000.85 for Mobilization, Demobilization and Final Cleanup is approximately 8.1% of its total bid substantially exceeding the 2.5% limit in Specification Section 9-1.18A.
3. This failure to comply with Section No. 9-1.18A is waivable, because it does not give Granite a competitive advantage over other bidders.
a. Despite the amount included in its bid for Mobilization, Demobilization and Final Cleanup, its bid is still the low bid.
b. As provided in Section No. 9-1.18A the amount included in Granite’s bid for Mobilization, Demobilization and Final Cleanup will be subject to review and approval, when Granite applies for payment of those costs.
c. The amount for Mobilization, Demobilization and Final Cleanup included in its bid would not entitle Granite to withdraw its bid without forfeiting its bid bond under Public Contract Code Section 5103, because the mistake (1) did not make the bid materially different than intended and (2) the amount included in Item 1 could not be considered a mistake made in filling out the bid form or result from a mathematical error..
From: Tom Smith
To: Myles Fisette; Tim Eriksen
Subject: RE: Capital Pavement Program: Preservation and Overlay Program - Specification No. 26-01 - Bid Protest Date: Monday, July 13, 2026 11:41:09 AM
Attachments: image002.png
image003.png
image001.png
image005.png
image006.png
image007.png
image004.png
image008.png
image009.png
[EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.
Good morning Mr. Fisette,
Just one clarifying question: “Does the City of Ukiah intend to comply with the City’s standard specifications for this project which incorporate Public Contract Code 10264 regarding the payment of mobilization?”
If the answer to the question above is “Yes”, then contractors that failed to comply with the 2.5% maximum Mob requirement in the specifications enjoy a significant advantage over other bidders who did comply.
In this case, Granite’s cashflow position on this project will be greatly enhanced for having bid the Mob in excess of $50,000 above the allowable 2.5%. Based on the PCC10264 Mob payment schedule (shown below), Granite will receive those dollars very early in the project, thereby giving them a large cash infusion and cashflow advantage over other bidders who complied with the 2.5% limitation requirement.
In other words, to say it “did not provide Granite with an unfair competitive advantage” is not accurate.
Please see examples A and B below showing how other public agencies and municipalities have managed this issue. **************************************************************************************************** Example A
Correspondence Received for Agenda Item 14a
************************************************************************************************************* Example B
********************************************************************************************************** Thank you for considering this matter.
Regards,
Thomas Smith
Vice President of Estimating
Ghilotti Construction Company Inc.
246 Ghilotti Avenue
Santa Rosa, CA 95407
Main: 707.585.1221
Correspondence Received for Agenda Item 14a
Mobile: 707.484.8292
[email protected]
From: Myles Fisette <[email protected]>
Sent: Friday, July 10, 2026 4:58 PM
To: Tom Smith <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]> Cc: CityClerk <[email protected]>; David Rapport <[email protected]>; Sage Sangiacomo <[email protected]>; Tim Eriksen <[email protected]>; Mary Horger <[email protected]> Subject: RE: Capital Pavement Program: Preservation and Overlay Program - Specification No. 26-01 - Bid Protest Good afternoon:
Attached please find a copy of the Agenda Summary Report for the upcoming City Council meeting next Wednesday at 5:15 p.m. This contains the City’s response and recommended action.
Myles Fisette, Purchasing Manager
411 West Clay Street, Ukiah, CA 95482
(707) 463-6225, [email protected]
From: Myles Fisette
Sent: Monday, June 29, 2026 3:07 PM
To: '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]> Cc: CityClerk <[email protected]>; David Rapport <[email protected]>; Sage Sangiacomo <[email protected]>; Tim Eriksen <[email protected]>; Mary Horger <[email protected]> Subject: RE: Capital Pavement Program: Preservation and Overlay Program - Specification No. 26-01 - Bid Protest Good afternoon:
Attached please find a copy of the bid protest response received today from Granite Construction Company, Inc.
Myles Fisette, Purchasing Manager
411 West Clay Street, Ukiah, CA 95482
(707) 463-6225, [email protected]
From: Myles Fisette
Sent: Thursday, June 25, 2026 10:14 AM
To: '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; '[email protected]' <[email protected]>; [email protected]; [email protected] Cc: CityClerk <[email protected]>; David Rapport <[email protected]>; Sage Sangiacomo <[email protected]>; Tim Eriksen <[email protected]>; Mary Horger <[email protected]> Subject: RE: Capital Pavement Program: Preservation and Overlay Program - Specification No. 26-01 - Bid Protest Good morning:
Per request, attached please find a copy of the bid package submitted by Ghilotti Construction Company Inc.
Myles Fisette, Purchasing Manager
411 West Clay Street, Ukiah, CA 95482
(707) 463-6225, [email protected]
From: Myles Fisette
Sent: Wednesday, June 24, 2026 4:16 PM
To: [email protected]; [email protected]; [email protected]; [email protected]; [email protected] Cc: CityClerk <[email protected]>; David Rapport <[email protected]>; Sage Sangiacomo <[email protected]>; Tim Eriksen <[email protected]>; Mary Horger <[email protected]> Subject: Capital Pavement Program: Preservation and Overlay Program - Specification No. 26-01 - Bid Protest Good afternoon:
In accordance with the Instructions to Bidders on Page 1 of Specification No. 26-01 for the above referenced project, I am forwarding a copy of a Bid Protest received from Ghilotti Construction Company Inc. to all bidders on this project. All such bidders may file with the City Manager a written objection or other response to the protest. The City Manager’s email address is [email protected] .
All objections or responses filed not more than 5 days after receipt of the written protest will be presented to the City Council at their meeting scheduled at 5:15 p.m. on Wednesday, July 15, 2026. The City Council will resolve the bid protest at that meeting based on the written protest, any staff recommendation and all timely written objections and responses. In accordance with the Brown Act, any person may address the City Council on this item during the meeting. The City Council action on the protest shall represent a final decision by the City on the protest.
Thank you,
Correspondence Received for Agenda Item 14a
Myles Fisette, Purchasing Manager
411 West Clay Street, Ukiah, CA 95482
(707) 463-6225, [email protected]
From: Tom Smith <[email protected]>
Sent: Wednesday, June 24, 2026 3:03 PM
To: Kristine Lawler <[email protected]>
Cc: Tim Eriksen <[email protected]>; Annette Conley <[email protected]> Subject: Capital Pavement Program: Preservation and Overlay Program - Specification No. 26-01 - Bid Protest [EXTERNAL EMAIL] DO NOT CLICK links or attachments unless you recognize the sender and know the content is safe.
Hello Ms. Lawler,
Re: Capital Pavement Program: Preservation and Overlay Program - Specification No. 26-01 - Bid Protest Please see the attached protest letter.
Regards,
Thomas Smith
Vice President of Estimating
Ghilotti Construction Company Inc.
246 Ghilotti Avenue
Santa Rosa, CA 95407
Main: 707.585.1221
Mobile: 707.484.8292
[email protected]
Disclaimer
The information contained in this communication from the sender is confidential. It is intended solely for use by the recipient and others authorized to receive it. If you are not the recipient, you are hereby notified that any disclosure, copying, distribution or taking action in relation of the contents of this information is strictly prohibited and may be unlawful.
This email has been scanned for viruses and malware, and may have been automatically archived by Mimecast, a leader in email security and cyber resilience. Mimecast integrates email defenses with brand protection, security awareness training, web security, compliance and other essential capabilities. Mimecast helps protect large and small organizations from malicious activity, human error and technology failure; and to lead the movement toward building a more resilient world. To find out more, visit our website.
Correspondence Received for Agenda Item 14a
Agenda Item No: 14.b.
MEETING DATE/TIME: 7/15/2026
ITEM NO: 2026-1237
AGENDA SUMMARY REPORT
SUBJECT: Adoption of Resolution Recommending the Designation of Census Tract 06045011600 for Opportunity Zones 2.0; and Direction to the Community Development Director to Prepare and Submit the Local Authority Recommendation Form for Census Tract 06045011600 to the California Governor's Office of Business and Economic Development (GO-Biz).
DEPARTMENT: Community
Development PREPARED BY: Craig Schlatter, Community Development Director PRESENTER: Craig Schlatter, Community Development
Director
ATTACHMENTS:
1. Census Tract 116 - Novogradac OZ 2.0 Map Viewer
2. Resolution - Census Tract 116 Recommendation as OZ
Summary: Council will consider adoption of a resolution recommending the designation of Census Tract 06045011600 for Opportunity Zones 2.0; and direct the Community Development Director to prepare and submit a Local Authority Recommendation Form for Census Tract 06045011600 to the California Governor's Office of Business and Economic Development (GO-Biz).
Background: The Opportunity Zone (OZ) Program was established under the Tax Cuts and Jobs Act of 2017 to encourage the reinvestment of capital gains into economically distressed communities. Defined at the individual census tract level, OZs are nominated by the governors of each state and territory, as well as the Mayor of the District of Columbia, and certified by the U.S. Secretary of the Treasury through a delegation of authority to the Internal Revenue Service. Under certain conditions, new investments in OZs may be eligible for preferential tax incentives.
The Opportunity Zone Program was originally scheduled to sunset on December 31, 2026, but with the passage of the One Big Beautiful Bill Act (OBBBA) on July 4, 2025, the program is now a permanent part of the federal tax code. As part of this legislation, a new round of Opportunity Zone census tract designations— referred to as "Opportunity Zones 2.0" — will be introduced. Designation of new OZs will be in place for 10 years and will refresh every 10 years thereafter.
According to the Governor's Office of Business and Economic Development (GO-Biz), "OZs can be a powerful tool for driving private investment into underserved communities." OZ investments are often layered with other forms of public and private financing, as part of the "capital stack," to redevelop properties and promote projects that provide economic growth, job creation, and community revitalization. The OZ tax incentive can support a range of investments, including commercial and industrial real estate, housing, infrastructure, and both existing and start-up businesses. For real estate projects to qualify, the investment must be "original use" or result in the property being "substantially improved." Discussion: In the first iteration of the Opportunity Zones Program in 2017, the Department of Treasury designated Census Tract 06045011501 (115.01) as an OZ but not Census Tract 06045011600 (116.00).
Census Tract 115.01 represents an area at the far northern tip of Ukiah's downtown but does not include the downtown core, which contains many of the properties such as the Palace Hotel, that may benefit from more significant investment. Census Tract 115.01 is not eligible for recommendation in Opportunity Zones 2.0.
Census Tract 06045011600 (116.00) is eligible for selection by the Governor as an Opportunity Zone and includes nearly all of Ukiah's downtown, as well as many of the commercial areas of Ukiah and the Ukiah Municipal Airport. See Attachment 1 for a map of Census Tract 116.00, which is provided by Novogradac to illustrate census tracts eligible for designation as OZs.
Census Tract 116.00 is especially unique within the Opportunity Zones 2.0 Program, as it has been designated as both "Eligible" and "Rural." Eligible rural census tract designations enable a potentially greater likelihood of investment under the OBBBA, as they contain special incentives compared to non-urban census tracts, such as a reduction of the "substantial improvement" requirement from 100% to 50% of the purchase price, as well as an increase in the step-up of basis from 10% to 30%.
Staff recommends Council adopt the Resolution in Attachment 2 recommending the designation of Census Tract 06045011600 for Opportunity Zones 2.0; and direct the Community Development Director to prepare and submit the Local Authority Recommendation Form for Census Tract 06045011600 to GO-Biz.
Recommended Action: Adopt a resolution recommending the designation of Census Tract 06045011600 for Opportunity Zones 2.0; and direct the Community Development Director to prepare and submit the Local Authority Recommendation Form for Census Tract 06045011600 to the California Governor's Office of Business and Economic Development (GO-Biz).
BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
REVENUE: Yes / No GRANT: Yes / No
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: N/A
STRATEGIC PLAN (SP): SP 2B - Identify and/or develop funding for essential and vital infrastructure for the long-term; SP 4A - Identify and remove barriers to economic development while leveraging economic opportunities; SP 4B - Develop and preserve the historic downtown as a regional center of civic and economic activity.
GENERAL PLAN ELEMENTS (GP): GP-A2 - Economic Development Element.
NOVOGRADAC OZ 2.0 MAP VIEWER
CENSUS TRACT 116 (NFIS CODE 06045011600)
Novogradac Weblink: https://www.policymap.com/embed/widget/12163/DNAOEK4MOFUIAGJCCEX7MVRX9IRWBIKG ATTACHMENT 1
ATTACHMENT 2
RESOLUTION NO. 2026-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UKIAH RECOMMENDING CENSUS TRACT 06045011600 (116), LOCATED IN AND ENCOMPASSING MOST OF UKIAH’S DOWNTOWN AND SURROUNDING COMMERCIAL AREAS, BE DESIGNATED AN
OPPORTUNITY ZONE UNDER THE UPDATED FEDERAL OPPORTUNITY ZONES PROGRAM (“OPPORTUNITY ZONE 2.0”) ENACTED BY THE ONE BIG BEAUTIFUL ACT ON JULY 4, 2025; AND AUTHORIZING THE COMMUNITY DEVELOPMENT DIRECTOR TO SUBMIT SUCH
RECOMMENDATION THROUGH THE LOCAL AUTHORITY RECOMMENDATION FORM AND OTHER APPLICABLE DOCUMENTS, TO THE CALIFORNIA GOVERNOR’S OFFICE OF BUSINESS AND ECONOMIC DEVELOPMENT (“GO-BIZ”)
WHEREAS:
1. The Federal Opportunity Zone Program was established to encourage long-term private investment in designated low-income communities through federal tax incentives tied to capital gains reinvestments; and
2. The updated Opportunity Zone Program (“Opportunity Zone 2.0”) continues and refines these incentives, with an emphasis of driving equitable economic growth, job creation, and redevelopment in targeted areas; and
3. The State of California, through the Governor's Office of Business and Economic Development (“GO-Biz”) and the Department of Finance, is conducting a formal engagement process allowing local communities to recommend census tracts for Governor consideration under the Opportunity Zone 2.0 program; and
4. The Governor of California will submit recommended census tracts to the United States Department of the Treasury, which will make the final determination regarding Opportunity Zone designation; and
5. Census Tract 116 (GEOID 06045011600) is located in and contains much of the area of Ukiah’s historic downtown, as well as other areas that would benefit from increased private investment, redevelopment, and economic activity; and
6. The City Council has adopted a Strategic Plan that directs identification and/or development of funding for essential and vital infrastructure for the long-term (SP-2B), the identification and removal of barriers to economic development while leveraging economic opportunities (SP4A), and the development and preservation of the historic downtown as a regional center of civic and economic activity (SP-4B); and
7. The City of Ukiah 2040 General Plan established an Economic Development Element that directs goals of being a key partner with other agencies and organizations to achieve the City’s and the region’s economic goals (ED-1), promoting a strong local economy by
improving critical infrastructure, including water, transportation, and renewable energy (ED2), providing opportunities for expansion of businesses by ensuring the availability of suitable sites, appropriate zoning, and access to infrastructure and amenities (ED-3), maintaining a supportive business climate and a healthy economy that leads to the expansion of existing businesses and the attraction of new ones (ED-6), and fostering a robust and diversified local economy that provides quality employment and attracts stable businesses (ED-10); and
8. Census Tract 116 (GEOID 06045011600) includes redevelopment opportunities aligned with the City Council’s adopted economic development goals and policies, including activation of vacant, abandoned, and underutilized properties, enhancement of the downtown core, and attraction of private investment into surrounding commercial areas; and
9. Designation as an Opportunity Zone can enhance the financial feasibility of development projects by attracting private equity, lowering capital costs, and increasing the competitiveness of projects seeking investment.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Ukiah hereby:
1. Recommends the designation of Census Tract 06045011600 (116) as an Opportunity Zone under the updated Federal Opportunity Zone Program (“2.0”); and
2. Directs the Community Development Director to prepare and submit the Local Authority Recommendation Form, plus any related documents, to the Governor’s Office of Business and Economic Development (“GO-Biz”).
PASSED AND ADOPTED this 15th day of July, 2026, by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
____________________________
Susan Sher, Mayor
ATTEST:
______________________________
Araceli Sandoval, Deputy City Clerk
Agenda Item No: 14.c.
MEETING DATE/TIME: 7/15/2026
ITEM NO: 2026-1213
AGENDA SUMMARY REPORT
SUBJECT: Receive Updates on City Council Committee and Ad Hoc Assignments, and, if Necessary, Consider Modifications to Assignments and/or the Creation/Elimination of Ad Hoc(s).
DEPARTMENT: City Clerk PREPARED BY: Kristine Lawler, City Clerk PRESENTER: Mayor Sher and Various Councilmembers
ATTACHMENTS:
1. 2026 City Council Special Assignments & Ad Hocs
Summary: City Council members will provide reports and updates on their committee and ad hoc assignments. If necessary, the Council may consider modifications.
Background: City Council members are assigned to a number of committees and ad hoc activities. These assignments are included as Attachment 1.
Discussion: Previously, the City Council discussed having more time allocated to reporting on committee and ad hoc activities. Often, the Council Reports section of the regular agenda is rushed due to impending business (i.e., public hearings), and not enough time is afforded for reports beyond community activities.
In an effort to foster regular updates on committee and ad hoc assignments, this item is being placed on the agenda to provide the City Council members an expanded opportunity to report on assignments and modify assignments as necessary.
Recommended Action: Receive report(s). The Council will consider modifications to committee and ad hoc assignments along with the creation/elimination ad hoc(s).
BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
REVENUE: No GRANT: No
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: N/A
STRATEGIC PLAN (SP): N/A
GENERAL PLAN ELEMENTS (GP): N/A
2026 CITY COUNCIL SPECIAL ASSIGNMENT LIST
LOCAL / UKIAH VALLEY MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Investment Oversight Committee Varies
Civic Center
300 Seminary Ave.Ukiah, CA 95482
Civic Center300 Seminary Ave.Ukiah, CA 95482
Reviews City investments, policies, and strategies
CraneOrozco - Alternate
Alan Carter, Treasurer
Dan Buffalo, Director of Finance; 463-6220
[email protected]
Disaster Council
Shall meet a minimum of once a year at a time and place designated upon call of the chair Place designated upon call of the chair or, if she/he is unavailable or unable to call such meeting, the first vice chair and then the City Manager or her/his designee.
Office of Emergency Management
300 Seminary Ave. Ukiah, CA 95482467-5720 - Traci Boyl
Develop any necessary emergency and mutual aid plans, agreements, ordinances, resolutions, rules, and regulations.
OrozcoCriss - Alternate Traci Boyl, City Manager's Office Management Analyst; 467-5720; [email protected] Greater Ukiah Business & Tourism Alliance (GUPTA)
4th Monday of month, 10 a.m.
200 S School St.Ukiah, CA 95482
200 S School St.Ukiah, CA 95482
Promotes tourism and works to strengthen and promote the historic downtown and businesses within the greater Ukiah area Marianne Davison - Community Services Department Staff Orozco - Alternate Shannon Riley, Deputy City Manager;
467-5793 [email protected]
Mendocino County Inland Water and Power Commission (IWPC) 2nd Thursday of month, 6:00 p.m.
Civic Center
300 Seminary Avenue
conference room 5
IWPC Staff P.O. Box 1247Ukiah, CA 95482391-7574 - Candace Horsley Develops coordination for water resources and current water rights: Potter Valley project - Eel River Diversion
RodinOrozco - Alternate
Jared Walker, Director of Water Resources; 467-5712, [email protected] North Coast Opportunities (NCO) 4th Wednesday of month, 2 p.m. Alternating locations - Ukiah and Lakeport Governing Board Chair
North Coast Opportunities413 North State Street
Ukiah, CA 95482
Assist low income and disadvantaged people to become self reliant Neil Davis Neil Davis, City [email protected] Sun House Guild ex officio 2nd Tuesday of month, 10:30 a.m. Sun House 431 S. Main St. Ukiah, CA 431 S. Main Street Ukiah, CA 95482 467-2836 Support and expand Grace Hudson Museum Orozco, Sher Jake Burgess - Alternate David Burton, Museum Director; 467-2836 [email protected] Ukiah Men's Golf Club Liaison 1st Tuesday of month, 4 - 5 pm Golf Course Clubhouse 599 Park Blvd. Golf Course Clubhouse 599 Park Blvd [email protected] An association of male golfers who promote and support golf in Ukiah. Jake Burgess Jake Burgess, Community Services Director; 463- 6201, [email protected] Ukiah Valley Basin Groundwater Sustainability Agency (GSA) 2nd Thursday of month, 1:30 p.m.
Board of Supervisors Chambers; 501 Low
Gap RoadUkiah, CA
County Executive Office
501 Low Gap Rd., Rm. 1010Ukiah, CA 95482463-4441
GSA serves as the Groundwater Sustainability Agency in the Ukiah Valley basin CraneN/A - Alternate
Jared Walker, Director of Water Resources; 467-5712, [email protected]
MENDOCINO COUNTY MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT City Selection Committee Called as required by the Clerk of the Board BOS Conference Room 501 Low Gap Rd. Rm. 1090 Ukiah, CA C/O: BOS 501 Low Gap Rd., Rm 1090 Ukiah, CA 95482 463-4441 Makes appointments to LAFCO and Airport Land Use Commission (Mayor - Primary; Vice Mayor - Alternate) Mayor Sher Vice Mayor Orozco Kristine Lawler, City Clerk; 463-6217 [email protected] Economic Development & Financing Corporation (EDFC)
2nd Thursday of month, 2:00 p.m.
Primarily 631 S. Orchard Street (location varies)
Executive Director631 South Orchard AvenueUkiah, CA 95482467-5953 Multi-agency co-op for economic development and business loan program Riley (appointed 12/19/18) Shannon Riley, Deputy City Manager; 467-5793 [email protected] Library Advisory Board
3rd Wednesdays of alternate months; 1:00
p.m.
Various Mendocino County Libraries Ukiah County Library 463-4491 Review library policy and activities Sher Rodin - Alternate Kristine Lawler, City Clerk; 463-6217; [email protected] Mendocino County 1st District Liaison Monthly; TBD
Civic Center Annex
conference room #5411 West Clay St.Ukiah, CA 95482
Civic Center
300 Seminary Ave.Ukiah, CA 95482
To coordinate activities and policy development with the City's 1st District Supervisor Crane Rodin - Alternate
Sage Sangiacomo, City Manager;
463-6221; [email protected]
Mendocino County 2nd District Liaison 1st Wednesdays of month, 8:00 a.m.
Civic Center Annex
conference room #5411 West Clay St.Ukiah, CA 95482
Civic Center
300 Seminary Ave.Ukiah, CA 95482
To coordinate activities and policy development with the County's 2nd District Supervisor CrissRodin - Alternate
Shannon Riley, Deputy City Manager;467-5793 [email protected] Mendocino Council of Governments
(MCOG)
1st Monday of month, 1:30 p.m.
Board of Supervisors Chambers
501 Low Gap RoadUkiah, CA
Executive Director
367 N. State Street, Ste. 206
Ukiah, CA 95482
463-1859
Plan and allocate State funding, transportation, infrastructure and project County wide Criss Sher - Alternate
Tim Eriksen, Public Works Director/City Engineer;
463-6280 [email protected] Schlatter, Community Development Director; 463-6219; [email protected]
Mendocino County Airport Land Use Commission As needed
BOS Conference Room
501 Low Gap Rd., Rm. 1090,Ukiah, CA
Mendocino County Executive Office
501 Low Gap Rd. Rm. 1010 Ukiah, CA 95482
To formulate a land use compatibility plan, provide for the orderly growth of the airport and the surrounding area, and safeguard the general welfare of the inhabitants within the vicinity Liaisons: Owen/Schlatter
Greg Owen, Airport Manager; 467-2855; [email protected] Craig Schlatter, Director of Community
Development; 463-6219; [email protected]
Mendocino Local Area Formation Commission (LAFCo)
1st Monday of month, 9:00 a.m. Board of Supervisors Chambers Executive Director200 S. School Street, Ste. 2
Ukiah, CA 95482
463-4470
Required by legislation - planning spheres of influence, annexation, service areas, and special districts RodinCrane - Alternate for both city seat
members on Commission
Craig Schlatter, Director of Community Development; 463-6219; [email protected] Updated: 2/5/2026
Attachment 1
2026 CITY COUNCIL SPECIAL ASSIGNMENT LIST
MENDOCINO COUNTY
Continued MTG DATE/TIME MEETING LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Mendocino Solid Waste Management Authority (MSWMA)
3rd Thursday of every other month (varies), 10:00 a.m.
Willits Council Chambers
Solid Waste Director3200 Taylor DriveUkiah, CA 95482468-9710 County-wide Solid Waste JPA Crane Sher - Alternate Tim Eriksen, Public Works Director/City Engineer; 463-6280 [email protected] Mendocino Transit Authority (MTA) Board of Directors
Last Wednesday of month, 1:30 p.m.
Alternating locations - Ukiah Conference Center or Fort Bragg, or Point Arena Executive Director241 Plant RoadUkiah, CA 95482462-1422 County-wide bus transportation issues and funding Sher Rodin - Alternate Tim Eriksen, Public Works Director/City Engineer; 463-6280 [email protected] Mendocino Youth Project JPA Board of Directors
3rd Wednesday of month, 7:45 a.m. 776 S. State Street Conference Room Mendocino Co. Youth Project776 S. State Street, Ste. 107Ukiah, CA 95482 707-463-4915 Targets all youth with a focus on drug and alcohol prevention, healthy alternatives and empowering youth to make healthy choices Criss Max Brazill, Admin Lieutenant - Alternate
Tom Corning, Police Chief; 463-6254;
[email protected]
Russian River Flood Control District (RRFCD) Liaison
1st Monday of month, 5:30 p.m.
151 Laws Ave.,Suite D Ukiah, CA
151 Laws Ave., Ukiah, CA 95482; [email protected]; 462-5278 Proactively manage the water resources of the upper Russian River for the benefit of the people and environment of Mendocino County Walker/Orozco Jared Walker, Director of Water Resources; 467-5712, [email protected]
Ukiah Players Theater Board of Directors
3rd Tuesday of month, 6:00 p.m
1041 Low Gap Rd Ukiah, CA 95482 462-1210
1041 Low Gap RdUkiah, CA 95482462-1210
To oversee the activities, organization and purpose of the Ukiah Players Theater Greg Owen, Airport Manager(appointed 12/19/18)
Kristine Lawler, City Clerk; 463-6217 [email protected] Ukiah Unified School District (UUSD) Committee Quarterly 511 S. Orchard, Ste. D Ukiah, CA 95482 511 S. Orchard Ukiah, CA 95482 Information exchange with UUSD Board Chair, Mayor, Superintendent, and City Manager Orozco, Criss Sage Sangiacomo, City Manager Tom Corning, Police Chief Sage Sangiacomo, City Manager; 463-6221 [email protected]
REGIONAL MTG DATE/TIME LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Great Redwood Trail Agency (GRTA) Bi-monthly, 3rd Thursdays, 10:30 a.m. Various Locations - announced 419 Talmage Road, Suite M Ukiah, CA 95482 463-3280 Provides a unified and revitalized rail infrastructure meeting the freight and passenger needs of the region Rodin Sher- Alternate Jake Burgess, Community Services Director 463-6201, [email protected] League of California Cities Redwood Empire Legislative Committee Prior to Division Meetings, meets 3x in person and then via conference call Various locations that are announced
Redwood Empire League President; Public Affairs Program Manager (916) 658-8243 Elected city officials and professional city staff attend division meetings throughout the year to share what they are doing and advocate for their interests in Sacramento OrozcoCriss - Alternate
Sage Sangiacomo, City Manager; 463-6221
[email protected]
Russian River Watershed Association (RRWA)
4th Thursday of month, 9:00 a.m. (only 5 times a year)
Windsor Town Hall9291 Old Redwood Hwy, #400Windsor, CA 95492707-838-1000 Russian River Watershed Association 2235 Mercury Way, Suite 105Santa Rose, CA [email protected] 707-508-3670 (message only) Consider issues related to Russian river - plans projects and funding requests RodinSher - Alternate
Tim Eriksen, Public Works Director/City Engineer;
463-6280 [email protected]
Northern California Power Agency (NCPA) - Commission
4th Thursday of month, 9:00 a.m. (see NCPA calendar)
Roseville, CA and other locations
651 Commerce Drive Roseville, CA 95678916-781-4202
Pool of State and local power utilities developing and operating power generation, providing scheduling and related energy services and providing regulatory and legislative support.
Crane - Commissioner Sher - City Council Alternate Sauers - Alternate and Commissioner in absence of Commissioner Crane
Cindy Sauers - Electric Utility Director;463-6286 [email protected] Northern California Power Agency (NCPA) – Lodi Energy Center (LEC) Appointment 2nd Monday of month, 10:00 AM Lodi, CA and other locations 651 Commerce DriveRoseville, CA 95678916-781-4299
Committee oversees the operation, maintenance and expenditures of the LEC 300 MW generating project.
Sauers – Project Participate Appointee
Cindy Sauers, Electric Utility Director,463-6286, [email protected] Transmission Agency of Northern California (TANC)
4th Wednesday of month, 10 a.m. 35 Iron Point Circle Suite 225 Folsom, CA 35 Iron Point Cir #225Folsom, CA 95630916-852-1673; [email protected] Provide electric transmission to its Member utilities through transmission line ownership or contract arrangements.
CraneSauers - Alternate
Cindy Sauers - Electric Utility Director;
463-6286 [email protected]
STANDING COMMITTEES MTG DATE/TIME LOCATION MAILING ADDRESS/CONTACT COMMITTEE FUNCTION ASSIGNED TO PRINCIPAL STAFF SUPPORT Diversity and Equity TBD Virtual Meeting Room (link to be created) Civic Center 300 Seminary Ave. Ukiah, CA 95482 Improve diversity and equity in the City’s workforce and municipal services Orozco/Criss Traci Boyl, City Manager's Office Management Analyst; 467-5720; [email protected] Fire Executive Committee
2nd Tue, every other month beginning in January; 5:00 p.m.
Ukiah Valley Conference Center,200 S. School Street Ukiah, CA Civic Center300 Seminary Ave.Ukiah, CA 95482 [email protected] Per the recently adopted agreement between the City of Ukiah and the Ukiah Valley Fire Protection District Orozco/SherAlternates: Criss
Doug Hutchison, Fire Chief; 463-6263;
[email protected]
Countywide Oversight Board to the RDA Successor Agencies 4th Thursday of January, 4:00 p.m.; meets annually
Ukiah Valley Conference Center,200 S. School Street Ukiah, CA City of UkiahATTN: City Clerk300 Seminary Ave.Ukiah, CA 95482 Oversee and direct the Successor Agencies of the former redevelopment agencies Crane Dan Buffalo, Director of Finance; 463-6220 [email protected] Lawler, City Clerk; 463-6217, [email protected] Water Executive Committee(Ukiah Valley Water Authority) 1st Tue of each month
at 5:00 p.m.
Ukiah Valley Conference Center,200 S. School Street Ukiah, CA City of UkiahATTN: Water Resources 300 Seminary Ave.Ukiah, CA 95482 Oversight of UVWA; set annual budget for the combined water system; Manage rates and collect levies; modify existing water rights for the provision of water service; mediation and dispute resolution; Crane/Orozco Jared Walker, Director of Water Resources; 467-5712, [email protected] Updated: 2/5/2026
COMMITTEE ASSIGNED TO PRINCIPAL STAFF SUPPORT
Electric Grid Operational Improvements Crane/Orozco Cindy Sauers, Electric Utility Director; 463-6286 [email protected]
Advance Planning & Policy for Annexation
Applications Crane/Rodin
Craig Schlatter, Community Development Director
463-6219 [email protected]
UVSD/ City Relations
Ad hoc committee to address specific issues with the Ukiah Valley Sanitation District, including discussion of overall sewer system service delivery policies, operating policy revisions, potential revisions to the current Operating Agreement, and cost sharing
Crane/Orozco
Dan Buffalo, Director of Finance;
463-6220 [email protected]
Jared Walker, Water Resources Director
467-5712, [email protected]
Complete Streets Rodin/Crane
Tim Eriksen, Public Works Director/City Engineer;
463-6280 [email protected]
Shannon Riley, Deputy City Manager
467-5793 [email protected]
Jake Burgess, Community Services Director
463-6201 [email protected]
Special Districts (Water District Consolidation) Orozco/Crane Shannon Riley, Deputy City Manager 467-5793 [email protected]
Corp Yard Planning Crane/Orozco Jason Benson, Senior Civil Engineer 463-6284 [email protected]
Mendocino County Courthouse Project and Reuse Sher/Orozco Shannon Riley, Deputy City Manager 467-5793 [email protected]
City's 150-Year Anniversary Planning Orozco/Rodin Shannon Riley, Deputy City Manager 467-5793 [email protected]
Airport Policy Criss/Crane Craig Schlatter, Community Development Director 463-6219 [email protected]
Parks & Recreation Special District Exploration Rodin/Orozco Jake Burgess, Community Services Director 463-6201 [email protected]
Downtown Zoning Code Crane/Rodin Jesse Davis, Chief Planning Manager 463-6207, [email protected]
Tourism Advisory Committee Rodin/Sher Shannon Riley, Deputy City Manager 467-5793 [email protected]
Historic Preservation Code Sher/Criss Craig Schlatter, Community Development Director 463-6219 [email protected]
Fire Severity Rodin/Orozco Craig Schlatter, Community Development Director 463-6219 [email protected]
CalPERS Crane/Orozco Dan Buffalo, Director of Finance;
463-6220 [email protected]
City Council Handbook Review and Update Sher Kristine Lawler, City Clerk 463-6217; [email protected]
Energy Resilience Sher/Orozco Cindy Sauers, Electric Utility Director; 463-6286 [email protected]
Proclamation Sher/Rodin
Shannon Riley, Deputy City Manager
467-5793 [email protected]
Traci Boyl, Senior Management Analyst
467-5720 [email protected]
2026 AD HOC COMMITTEES
*Note: Changing the composition of an existing ad-hoc among current councilmembers after work has begun presents potential Brown Act issues. Requests for fully filled ad-hocs are represented on the draft, but staff does not recommend changes except to fill vacated assignments. The current requests on the sheet for fully composed ad-hocs are primarily intended to convey interest in topics covered by these ad-hoc committees for possible future consideration of new assignments.
Updated: 6/11/2026
Agenda Item No: 14.d.
MEETING DATE/TIME: 7/15/2026
ITEM NO: 2026-1240
AGENDA SUMMARY REPORT
SUBJECT: Consider Authorizing the City Manager to Negotiate and Execute a Tolling Agreement Between the Ukiah Rifle and Pistol Club and the City of Ukiah.
DEPARTMENT: City Manager /
Admin PREPARED BY: Sage Sangiacomo, City Manager
PRESENTER: Sage Sangiacomo, City Manager and David
Rapport, City Attorney
ATTACHMENTS:
None
Summary: The City Council will consider authorizing the City Manager to negotiate and execute a Tolling Agreement between the Ukiah Rifle and Pistol Club and the City of Ukiah.
Background: The City and the Ukiah City Council are respondents and defendants and Ukiah Rifle and Pistol Club is a defendant and real party in interest in an action filed on January 5, 2018, in Mendocino County Superior Court by the Vichy Springs Resort entitled Vichy Springs Resort v. City of Ukiah et al., SCUK-CVPT18-70200.
Discussion: The City Council will consider authorizing the City Manager to negotiate and execute a Tolling Agreement between the Ukiah Rifle and Pistol Club and the City of Ukiah. This item will first be discussed in closed session. If appropriate, the item will be presented and considered in open session.
Recommended Action: Authorize the City Manager to negotiate and execute a Tolling Agreement between the Ukiah Rifle and Pistol Club and the City of Ukiah.
BUDGET AMENDMENT REQUIRED: N/A
CURRENT BUDGET AMOUNT: N/A
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: N/A
REVENUE: Yes / No GRANT: Yes / No
PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: City Attorney's Office
STRATEGIC PLAN (SP): N/A
GENERAL PLAN ELEMENTS (GP): N/A