Agenda packet, regular meeting

Union City City Council
January 11, 2022

Document
Agenda packet, regular meeting
Meeting
January 11, 2022
Body
Union City City Council
Pages
29
Original file
23.2 MB
Text extracted from the city's file for reading and search. Open the original on unioncity.primegov.com. That file is the official record.

AGENDA

CITY OF UNION CITY/

SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY MEETING
Tuesday, January 11, 2022
7:00 PM
Held Via Teleconference. To access meeting please see Teleconference Guidelines.

Consistent with California State Assembly Bill 361, the City Council will be participating in public meetings via phone/video conferencing. Please see Teleconferece Guildines to learn how to view or participate in the City Council Meeting

1. CALL TO ORDER

1.a. Pledge of Allegiance

1.b. Roll Call
Mayor Carol Dutra-Vernaci
Vice Mayor Jaime Patiño
Councilmember Emily Duncan
Councilmember Pat Gacoscos
Councilmember Gary Singh

2. UNFINISHED BUSINESS - None

3. PROCLAMATIONS AND PRESENTATIONS

3.a. Introduction of New and Promoted Employees

4. ORAL COMMUNICATIONS
An individual speaker shall have three minutes to address the Council on non-agenda items under the Oral Communications section of the agenda. The Mayor may, in their discretion, lower the time limit to less than three minutes based on the number of speakers and/or business to be conducted by the City Council.

City Council/RSA Agenda 1 Tuesday, January 11, 2022
Members of the public who wish to speak to the Council under the first Oral Communications section are requested to complete a speaker card, giving their name and city of residence. If a speaker wants further notification from the City, the speaker may include a mailing address. Neither a speaker card or identification of name, city of residence or mailing address are not required to provide public comment but are requested for record keeping purposes.

5. CONSENT CALENDAR
All matters listed on the Consent Calendar are considered routine in nature and will be enacted by one motion. If discussion is required on a specific item, it will be removed from the Consent Calendar and considered separately.

5.a. Waived Further Reading of Proposed Ordinance
(This permits reading the title only in lieu of reciting the entire text of any proposed Ordinance.)

5.b. Approve the Minutes of the City Council Meetings Held on December 14, 2021 and December 20, 2021

5.c. Second Reading and Adoption of an Ordinance Adding Section

2.05.050 to Chapter 2.05 “Campaign Reporting Requirements” of the Union City Municipal Code to Require Electronic Filing of Campaign Statements

5.d. Adopt a Resolution Authorizing the City Manager to Execute Contract Amendment No. 9 to Extend the Union City Transit Fixed-Route and Demand Response Operations and
Maintenance Agreement with MV Transportation for an
Additional Six Months Through June 30, 2022

5.e. Adopt a Resolution Authorizing the City Manager to Execute a Consulting Services Agreement with Mark Thomas & Company, Inc. for Preliminary Engineering (30% Design) of Phases (Segments) 1 and 2 for Quarry Lakes Parkway (East West
Connector), City Project No. 18-04, in the Amount of
$1,200,000

5.f. Adopt a Resolution Authorizing the City Manager to Enter into an Agreement in an Amount Not-to-Exceed $160,000 with
TBWBH Props and Measures, Including Public Polling with Godbe Research, to Provide Professional Services Regarding the Consideration of Future Tax Measures

5.g. Adopt a Resolution Finding That There Is a Proclaimed State of Emergency; Finding That Meeting in Person Would Present Imminent Risks to the Health or Safety of Attendees as a Result of the State of Emergency; and Authorizing Remote
Teleconferenced Meetings of the Legislative Bodies of the City of Union City for the 30 day Period Beginning January 11 Pursuant to AB 361
City Council/RSA Agenda 2 Tuesday, January 11, 2022

5.h. Adopt a Resolution of the City Council of the City of Union City Confirming the Continued Existence of a Local Emergency Due to COVID-19

6. PUBLIC HEARINGS - None

7. CITY MANAGER REPORTS

7.a. Informational Report and Receive Council Direction Regarding Tobacco Retail License Update

8. SUCCESSOR AGENCY TO REDEVELOPMENT AGENCY -
None

9. AUTHORITIES AND AGENCIES - None

10. CITY COMMISSION / COMMITTEE REPORTS - None

11. SCHEDULED ORAL COMMUNICATION - None

12. ITEMS REFERRED BY COUNCIL

13. GOOD OF THE ORDER

14. CLOSED SESSION - None

15. ADJOURNMENT
A complete agenda packet is available for review at City Hall or on our website www.unioncity.org
Any writings or documents provided to a majority of City Council members regarding any item on this agenda will be made available for public inspection at the City Clerk's Counter at City Hall, located at 34009 Alvarado-Niles Road, Union City, California, during normal business hours.

Assistance will be provided to those requiring accommodations for disabilities in compliance with the Americans with Disabilities Act of 1990.

Interested person must request the accommodation at least two working days in advance of the meeting by contacting the City Clerk at (510) 675- 5348.

TELECONFERENCING GUIDELINES FOR THE CITY OF UNION CITY REGULAR COUNCIL

MEETING
COVID-19 Notice: Consistent with State of California Executive Order No. 29-20 dated March 17, 2020, the City Council will be participating in public meetings via phone/video conferencing. The City Council Chambers will not be open to the public. Members of the public can observe and address the Council using the below technological processes.

How to watch the meeting remotely:

1. Comcast TV Channel 15 (UCTV 15)
City Council/RSA Agenda 3 Tuesday, January 11, 2022

2. Live stream https: https://www.unioncity.org/199/City-Meetings-Video How to Address Council:

Written Comment: To provide written comment on an item on the agenda or to address the Council about an issue during Public Comment, you may send an email to [email protected]. Please include the phrase "public comment" in the subject line and note the agenda item number that you want to address. Written comments received before 3:00 p.m. will be e-mailed to the City Council and made publicly available. Comments received after 3:00 p.m. will be read into the record for up to the first 300 words (approximately 3 minutes consistent with the time limit provided for public speakers) and added to the official record.

Public Comment via Teleconference: Members of the public may address the Council on a matter on the agenda or during the Public Input portion of the meeting. Raise your virtual hand to notify the host that you would like to speak during that portion.

Instructions on Raising your Hand in Zoom Webinar:

1.Click Raise Hand in the webinar controls. The host will be notified that you've raised your hand.

2.If the host allows you to talk, you may be prompted to unmute yourself. While unmuted, your profile picture and name is displayed to the host and panelists. Only your name is displayed to other attendees.

3.Click Raise Hand in the webinar controls to lower it, if needed. This will not mute yourself if you are unmuted.

Zoom Shortcuts:

Windows: You can also use the AltY keyboard shortcut to raise or lower your hand.

Mac: You can also use the OptionY keyboard shortcut to raise or lower your hand.

Please click the link below to join the webinar:
http://citycouncil-live.unioncity.org/
Passcode: Mr6%qH6P
Or Telephone:

Dial (for higher quality, dial a number based on your current location):

US: +1 213 338 8477 or +1 301 715 8592 or +1 408 638 0968 or +1 646 518 9805 Webinar ID: 928 8582 6000
Passcode: 52282697
ADA Accessibility: If you require a reasonable modification or accommodation for a disability, please email the
City Clerk at [email protected] a minimum of two (2) business days prior to the Council meeting. 3511412.1
City Council/RSA Agenda 4 Tuesday, January 11, 2022
Agenda Item
DATE:

TO: HONORABLE MAYOR AND CITY COUNCIL
FROM:

SUBJECT:

STRATEGIC PLAN ALIGNMENT

BACKGROUND

DISCUSSION

FISCAL IMPACT

RECOMMENDATION
Prepared by:

City Council/RSA Agenda 5 Tuesday, January 11, 2022
Submitted by:

ATTACHMENTS:

Description Type
Introduction of New Hires and Promotions to City Council Resolution Power Point Attachment
City Council/RSA Agenda 6 Tuesday, January 11, 2022
Agenda Item
DATE: 01/11/2022
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: JOAN MALLOY, CITY MANAGER
SUBJECT: INTRODUCTION OF NEW AND PROMOTED EMPLOYEES
Staff presents the following new and promoted employees through December 2021, to the Mayor and City Council:

CITY MANAGER’S OFFICE
New Hires:
 Uyen Mai was hired on August 9, 2021. She works in the City Manager’s Department as a Sustainability Analyst I.
 Jonathan Segarra was hired on November 29, 2021. He works in the City Manager’s Department as a Management Analyst II.

COMMUNITY & RECREATION SERVICES DEPARTMENT
New Hires:
 Tracie Gutierrez was hired on September 7, 2021. She works in the Holly Preschool Division in the Community & Recreation Services Department as a Preschool Site Supervisor I.

Promotions:
 Robert Sangco was promoted from Office Specialist II to Program Coordinator on March 8, 2021.

ECONOMIC & COMMUNITY DEVELOPMENT DEPARTMENT
New Hires:
 Brandon DeLucas was hired on May 17, 2021. He works in the Economic and Community Development Department as an Associate Planner.
 Korrine Adams was hired on September 20, 2021. She works in the Economic and Community Development Department as an Administrative Assistant II.

City Council/RSA Agenda 7 Tuesday, January 11, 2022
 Corey Cardwell was hired on November 1, 2021. He works in the Economic and Community Development Department as a Building/Code Compliance Inspector.

FINANCE DEPARTMENT
New Hires:
 Gemma Cabana was hired on September 13, 2021. She works in the Finance Department as an Office Specialist I.
 Saipologa (Leah) Toala-Ho was hired on September 20, 2021. She works in the Finance Department as an Administrative Assistant II.

Promotions:
 Griffin Ellis was promoted from Finance Specialist III to Accountant on February 22, 2021.
 Senorina (Naomi) Garcia was promoted from Office Specialist II to Finance Specialist III on May 3, 2021.

HUMAN RESOURCES DEPARTMENT
New Hires:
 Jaime Rabe was hired on October 25, 2021. She works in the Human Resources Department as a Human Resources Technician.

Promotion:
 Rona Galvan was promoted from Office Specialist II to Administrative SpecialistConfidential on September 27, 2021.

INFORMATION TECHNOLOGY DEPARTMENT
New Hires:
 Stephan Krause was hired on July 6, 2021. He works in the Information Technology Department as a Senior Systems Analyst.

POLICE DEPARTMENT
New Hires:
 Brooke Thayer was hired on January 18, 2021. She works in the Police Department as a Police Cadet.
 Isaiah Romo was hired on January 19, 2021. He works in the Police Department as a Police Cadet.
 Allison Bejar was hired on January 19, 2021. She works in the Police Department as a Police Cadet.
 Annamaria Rojo Sousa was hired on June 7, 2021. She works in the Police Department as a Confidential Operation Assistant.

City Council/RSA Agenda 8 Tuesday, January 11, 2022
 Joseph Goodrich was hired on July 12, 2021. He works in the Police Department as a Community Service Aide.
 Caitlyn Frates was hired on September 20, 2021. She works in the Police Department as a Community Service Aide.
 Kyle Scarbrough was hired on September 21, 2021. He works in the Police Department as a Police Officer Recruit II.
 Jujhar Parmar was hired on December 13, 2021. He works in the Police Department as a Police Officer.
 Zakariya Ali was hired on December 13, 2021. He works in the Police Department as a Police Officer.
 Arash Aliyar was hired on December 13,2021. He works in the Police Department as a Police Officer.
 Ashlee Topete was hired on December 13, 2021. She works in the Police Department as a Police Office Assistant.

Promotions:
 Brian Baumgartner was promoted from Police Sergeant to Police Lieutenant on January 1, 2021.
 Daniel DeJong was promoted from Police Officer to Police Sergeant on January 18, 2021.
 Adalberto Alberto was promoted from Police Officer to Police Sergeant on January 18, 2021.
 Brian Ross was promoted from Police Officer Recruit II to Police Officer on April 22, 2021.
 Ian Hobson was promoted from Police Office Assistant to Personnel & Training Supervisor on May 17, 2021.
 Erick Benard Jr. was promoted from Police Officer Recruit II to Police Officer on September 16, 2021.
 Tyler Cox was promoted from Police Officer Recruit II to Police Officer on September 20, 2021.
 Julian Ordaz was promoted from Police Officer Recruit II to Police Officer on October 14, 2021.
 Scott Jensen was promoted from Police Officer to Police Sergeant on October 18, 2021.  Sergio Quintero was promoted from Police Sergeant to Police Lieutenant on October 18, 2021.
 Jeffrey Wilson was promoted from Police Officer to Police Sergeant on October 18, 2021.

City Council/RSA Agenda 9 Tuesday, January 11, 2022
 Elmore Spencer was promoted from Police Officer Recruit II to Police Officer on December 6, 2021.
 Sonia Vera was promoted to from Property & Evidence Specialist to Property & Evidence Supervisor on December 13, 2021.
 Noemi Estrada was promoted from Police Office Assistant to Property & Evidence Specialist on December 13, 2021.
 Ming Kim was promoted from Property & Evidence Specialist to Police Officer Recruit II on December 13, 2021.
 Travis Reid was promoted from Police Officer Trainee to Police Officer Recruit II on December 13, 2021.
 Cosmin Axenie was promoted from Police Officer Trainee to Police Officer Recruit II on December 13, 2021.

PUBLIC WORKS DEPARTMENT
New Hires:
 Erika Cramer was hired on August 30, 2021. She works in the Public Works Department as an Administrative Assistant III.
 Jesus Banuelos was hired on January 5, 2021. He works in the Public Works Department – Grounds Division as a Grounds Supervisor.
 Ramon Aguirre was hired on May 19, 2021. He works in the Public Works Department – Streets Division as a Maintenance Trainee – Streets.
 Jorge Rodriguez was hired on June 4, 2021. He works in the Public Works Department – Streets Division as a Maintenance Trainee – Streets.
 Moises Gonzalez was hired on September 10, 2021. He works in Public Works Department – Streets Division as a Maintenance Trainee – Streets.

Promotions:
 Jose Gutierrez was promoted from Public Works Inspector to Supervising Construction Inspector on July 12, 2021.
 Paul Roman was promoted from Maintenance II – Streets to Streets Supervisor on April 5, 2021.
 James Moscoso was promoted from Maintenance I – Streets to Maintenance II – Streets on April 19, 2021.
 Laurie Radovich was promoted by reclassification from Administrative Assistant III to Transit Coordinator
City Council/RSA Agenda 10 Tuesday, January 11, 2022

SENIOR MANAGEMENT TEAM
New Hires:
 Jacquelyn (Jackie) Acosta was hired on July 12, 2021. She works in the Finance Department as a Finance Director.

Prepared by:

Rona Galvan, Administrative Specialist - Confidential
Submitted by:

Joan Malloy, City Manager
Approved by:

Joan Malloy, City Manager
City Council/RSA Agenda 11 Tuesday, January 11, 2022
Item 3.a
Introduction of New and Promoted
Employees 2021-22
City Council/RSA Agenda 12 Tuesday, January 11, 2022
Senior Management Team
City Council/RSA Agenda 13 Tuesday, January 11, 2022
Finance Director
Jacquelyn (Jackie)
Acosta

SENIOR MANAGEMENT TEAM
NEW
City Council/RSA Agenda 14 Tuesday, January 11, 2022
City Manager’s Office
City Council/RSA Agenda 15 Tuesday, January 11, 2022
Sustainability Analyst I Management Analyst II
CITY MANAGER’S OFFICE
Uyen Mai Jonathan Segarra

NEW NEW
City Council/RSA Agenda 16 Tuesday, January 11, 2022
Community & Recreation
Services Department
City Council/RSA Agenda 17 Tuesday, January 11, 2022
Preschool Site Supervisor I Program Coordinator
Tracie Gutierrez

COMMUNITY & RECREATION SERVICES
Robert Sangco

NEW PROMOTED
City Council/RSA Agenda 18 Tuesday, January 11, 2022
Economic & Community
Development Department
City Council/RSA Agenda 19 Tuesday, January 11, 2022
Building/Code Compliance
Inspector
Associate Planner Administrative Assistant II
Brandon DeLucas

ECONOMIC & COMMUNITY DEVELOPMENT
Korrine Adams Corey Cardwell

NEW NEW NEW
City Council/RSA Agenda 20 Tuesday, January 11, 2022
Finance Department
City Council/RSA Agenda 21 Tuesday, January 11, 2022
Office Specialist I Administrative Assistant II Accountant Gemma Cabana

FINANCE DEPARTMENT
Finance Specialist III
Saipologa (Leah)
Toala-Ho Griffin Ellis
Senorina (Naomi)
Garcia

NEW NEW PROMOTION PROMOTION
City Council/RSA Agenda 22 Tuesday, January 11, 2022
Human Resources Department
City Council/RSA Agenda 23 Tuesday, January 11, 2022
Human Resources Technician Administrative Specialist-Confidential Jaime Rabe

HUMAN RESOURCES DEPARTMENT
Rona Galvan

NEW PROMOTED
City Council/RSA Agenda 24 Tuesday, January 11, 2022
Information Technology
Department
City Council/RSA Agenda 25 Tuesday, January 11, 2022
Senior Systems Analyst
Stephan Krause

INFORMATION TECHNOLOGY DEPARTMENT
NEW
City Council/RSA Agenda 26 Tuesday, January 11, 2022
Police Department
City Council/RSA Agenda 27 Tuesday, January 11, 2022
Police Cadet Police Cadet Police Cadet
Brooke Thayer

POLICE DEPARTMENT
Confidential Operations Assistant
Isaiah Romo Allison Bejar
Annamaria Rojo
Sousa

NEW NEW NEW NEW
City Council/RSA Agenda 28 Tuesday, January 11, 2022
Community Service Aide Community Service Aide Police Officer Recruit II Joseph Goodrich

POLICE DEPARTMENT
Police Officer
Caitlin Frates Kyle Scarbrough Jujhar Parmar

NEW NEW NEW NEW
City Council/RSA Agenda 29 Tuesday, January 11, 2022
Police Officer Police Officer Police Office Assistant
Zakariya Ali

POLICE DEPARTMENT
Arash Aliyar Ashlee Topete

NEW NEW NEW
City Council/RSA Agenda 30 Tuesday, January 11, 2022
Police Lieutenant Police Sergeant Police Sergeant
Brian Baumgartner

POLICE DEPARTMENT
Police Officer
Daniel Dejong Adalberto Alberto Brian Ross

PROMOTION PROMOTION PROMOTION PROMOTION
City Council/RSA Agenda 31 Tuesday, January 11, 2022
Personnel & Training Police Officer Police Officer
Supervisor
Ian Hobson

POLICE DEPARTMENT
Police Officer
Erick Benard Jr. Tyler Cox Julian Ordaz

PROMOTION PROMOTION PROMOTION PROMOTION
City Council/RSA Agenda 32 Tuesday, January 11, 2022
Police Sergeant Police Lieutenant Police Sergeant
Scott Jensen

POLICE DEPARTMENT
Police Officer
Sergio Quintero Jeffrey Willson Elmore Spencer

PROMOTION PROMOTION PROMOTION PROMOTION
City Council/RSA Agenda 33 Tuesday, January 11, 2022
Property & Evidence Police Officer Recruit II
Specialist
Property & Evidence
Supervisor
Sonia Vera

POLICE DEPARTMENT
Police Officer Recruit II
Noemi Estrada Ming Kim Travis Reid

PROMOTION PROMOTION PROMOTION PROMOTION
City Council/RSA Agenda 34 Tuesday, January 11, 2022
Police Officer Recruit II
Cosmin Axenie

POLICE DEPARTMENT

PROMOTION
City Council/RSA Agenda 35 Tuesday, January 11, 2022
Public Works Department
City Council/RSA Agenda 36 Tuesday, January 11, 2022
Maintenance Trainee –
Streets
Administrative Assistant Grounds Supervisor
III
Erika Cramer

PUBLIC WORKS DEPARTMENT
Maintenance Trainee –
Streets
Jesus Banuelos Ramon Aguirre Jorge Rodriguez

NEW NEW NEW NEW
City Council/RSA Agenda 37 Tuesday, January 11, 2022
Supervising Construction Streets Supervisor
Inspector
Maintenance Trainee –
Streets
Moises Gonzalez

PUBLIC WORKS DEPARTMENT
Maintenance II – Streets
Jose Gutierrez Paul Roman James Moscoso

NEW PROMOTED PROMOTED PROMOTED
City Council/RSA Agenda 38 Tuesday, January 11, 2022
Transit Coordinator
Laurie Radovich

PUBLIC WORKS

PROMOTION
City Council/RSA Agenda 39 Tuesday, January 11, 2022
Agenda Item
ATTACHMENTS:

Description Type
Draft Min Sp 12/14/2021 Attachment
Draft Min Reg 12/14/21 Attachment
Draft Min Sp 12/20/21 Attachment
City Council/RSA Agenda 40 Tuesday, January 11, 2022

MINUTES

CITY OF UNION CITY

CITY COUNCIL SPECIAL MEETING
Tuesday, December 14, 2021
5:30 PM
City Hall - City Council Conference Room
34009 Alvarado-Niles Road
Union City, CA 94587
Consistent with California State Assembly Bill 361, the City Council participated in the Closed Session meeting via phone/video conferencing.

1. CALL TO ORDER
Mayor Dutra-Vernaci called the meeting to order at 4:00 p.m.

Roll Call Present: Councilmembers Duncan, Patiño, Singh, Vice Mayor Gacoscos, Mayor Dutra-Vernaci

Absent: None

2. ORAL COMMUNICATIONS - None

3. CLOSED SESSION

3.a. CONFERENCE WITH LABOR NEGOTIATORS
Gov. Code Section 54957.6
Agency designated representative:

Lilybell Nakamura, Chief Human Resources Officer
Jeff Bailey, IEDA Representative
Employee organization:

Management Employees Group (MEG)
Professional Employees Group (PEG)
Service Employees International Union, Local 1021 (SEIU) Union City Police Management Association (UCPMA)
Union City Police Officers Association (UCPOA)

3.b. CONFERENCE WITH LEGAL COUNSEL - ANTICIPATED

LEGISLATION
City Council/RSA Agenda 41 Tuesday, January 11, 2022
Initiation of litigation pursuant to Gov. Code section 54956.9(d)(4): 1 case.

City Attorney Kokotaylo reported the following action in open session: It was moved by Mayor Dutra-Vernaci and seconded by Councilmember Patiño, to authorize the City Attorney to initiate litigation. Once the litigation is formally commenced, the action of defendants and all other particulars will be disclosed to any persons upon inquiry, unless doing so would jeopardize service of process or settlement negotiations. The motion was carried by a unanimous roll call vote.

4. ADJOURNMENT
Mayor Dutra-Vernaci adjourned the meeting at 6:48 p.m. with no further reportable action.

Respectfully submitted,
Anna M. Brown, CMC
City Clerk
City Council/RSA Agenda 42 Tuesday, January 11, 2022

MINUTES

CITY OF UNION CITY/

SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY MEETING
Tuesday, December 14, 2021
7:00 PM
Held Via Teleconference
Consistent with State of California Executive Order No. 29-20 dated March 17, 2020, the City Council participated in the public meeting via phone/video conferencing, with all votes conducted by a roll call vote.

1. CALL TO ORDER
Mayor Dutra-Vernaci called the meeting to order at 7:01 p.m.

1.a. Pledge of Allegiance
In lieu of the pledge, Mayor Dutra-Vernaci held remembrance for the 80th Anniversary of the Attack on Pearl Harbor on December 7, 1941.

1.b. Roll Call Present: Councilmembers Duncan, Patiño, Singh Vice Mayor Gacoscos, Mayor Dutra-Vernaci

Absent: None

2. UNFINISHED BUSINESS - None

3. PROCLAMATIONS AND PRESENTATIONS

3.a. Appointment of Vice Mayor
It was moved by Mayor Dutra-Vernaci and seconded by Councilmember Singh to appoint Councilmember Patiño as Vice Mayor. The motion was carried by a unanimous roll call vote.

3.b. Council Assignments to Various Boards and Commissions Mayor Dutra-Vernaci announced that there were no changes to Council assignments for the coming year.

3.c. Presentation on Union Sanitary District Enhanced Treatment and Site Upgrade Project
City Council/RSA Agenda 43 Tuesday, January 11, 2022
Union Sanitary District General Manager, Paul Eldridge, gave the presentation and responded to questions from Council.

4. ORAL COMMUNICATIONS - None

5. CONSENT CALENDAR
It was moved by Councilmember Gacoscos and seconded by Councilmember Singh to adopt consent calendar items 5.a. through 5.n. The motion was carried by a unanimous roll call vote.

5.a. Waived Further Reading of Proposed Ordinance
(This permits reading the title only in lieu of reciting the entire text of any proposed Ordinance.)

5.b. Approved the Minutes of the Special and Regular City Council Meetings Held on November 23, 2021

5.c. Adopted Resolution No. 5862-21 Approving an Amendment to the Classification Plan and Adopting a Side Letter Between the City of Union City and the Professional Employees Group to Create the New Position of Homeless Program Coordinator/Case Manager; Approving an Amendment to the City’s Compensation Plan and Salary Schedule in Conformance with California Code of Regulations, Title 2, Section 570.5; and Accepting Permanent Local Housing Allocation (PLHA) Funds for Fiscal Year 2021-22 for CRS Case Management Services

5.d. Adopted Resolution No. 5863-21 Finding that there is a Proclaimed State of Emergency; Finding that Meeting in Person Would Present Imminent Risks to the Health or Safety of Attendees as a Result of the State of Emergency; and Authorizing Remote Teleconferenced Meetings of the Legislative Bodies of the City of Union City for the 30-Day Period Beginning December 14 Pursuant to AB 361

5.e. Adopted Resolution No. 5864-21 Appointing Jackie Acosta, Finance Director, as the City of Union City Representative to Serve on the Union City Block 4 Maintenance Association Board of Directors

5.f. Adopted Resolution No. 5865-21 Approving Amendment No. 1 to the Consulting Services Agreement with Rail Surveryors and Engineers, Inc. (RSE) in the Amount of $60,000 to Provide Engineering Services for the BART Pedestrian At-Grade Crossing Project, City Project No. 14-14 for a Total Contract Amount of $100,000

5.g. Adopted Resolution No. 5866-21 to Authorize the Union Landing Property Owners Association to Execute a First Amendment to the Consulting Services Agreement with Zooka Creative Corporation to Increase by $30,000 For a Total Not to Exceed Amount of $138,550 on Behalf of the Union Landing Property Business and Improvement District

5.h. Adopted Resolution No. 5867-21 to Accept Completion of the 2020-21 Base Failure Repair and Slurry Seal Project, City Project No. 21-02

5.i. Adopted Resolution No. 5868-21 to Accept an $81,000 Grant from the Alameda County Transportation Commission, Project Funding Agreement City Council/RSA Agenda 44 Tuesday, January 11, 2022
A22-0017, for the Enhancement of Pedestrian Infrastructure at James Logan High School and Guy Emanuele, Jr. Elementary School Project, City Project No. 21-27, and to Appropriate $98,000 as the Required Local Match, with $48,000 from Gas Tax Funds (Fund 2510) and $50,000 from Measure BB Bike & Pedestrian Funds (Fund 2546), for a Total Project Cost of $179,000

5.j. Adopted Resolution No. 5869-21 Approving the Union City Community Energy Response Team (CERT) By-Laws

5.k. Adopted Resolution No. 5870-21 Canceling the Regular City Council Meeting of December 28, 2021

5.l. Adopted Resolution No. 5871-21 Authorizing Amendment No. 1 To Master Contract No. 901630 With the Alameda County Probation Department Extending The Agreement For Two Additional Years And Increasing The Contract Amount From $540,000 To $900,000, To Continue Providing Delinquency Prevention Services

5.m. Adopted Resolution No. 5872-21 accepting the Annual Reports for Fiscal Year 2020-2021 Concerning Sources and Uses of Development Fees Pursuant to Government Code Section 66006, et seq

5.n. Adopted Resolution No. 5873-21 accepting the 5-Year Reports for Fiscal Years 2016-2017 through 2020-2021 Concerning Sources and Uses of Development Fees Pursuant to Government Code Section 66006, et. seq.

6. PUBLIC HEARINGS

6.a. Adopt an Urgency Ordinance Extending the Urgency Ordinance Adding Chapter 18.31, “SB 9 Subdivisions and Development Projects”, to the Municipal Code
Deputy City Attorney Alex Mog presented the staff report and responded to questions from Council. Councilmembers provided comment.

It was moved by Councilmember Duncan and seconded by Vice Mayor Patiño to adopt Urgency Ordinance No. 893-21 Extending the Urgency Ordinance Adding Chapter 18.31, “SB 9 Subdivisions and Development Projects”, to the Municipal Code. The motion was carried by a unanimous roll call vote.

7. CITY MANAGER REPORTS

7.a. Adopt a Resolution Approving an Exclusive Negotiating Agreement (ENA) with City Ventures, LLC, for the Sale and Development of a Portion of the Gateway Property, Bounded by Alvarado-Niles Road, Osprey Drive, Old Alameda Creek, and the City Limit Line with Fremont
Deputy City Manager Evanoff presented the staff report. Samantha Hauser, Senior Vice President of Development for City Ventures, LLC provided additional information. The staff report included information on City Ventures' proposal, ENA framework, ENA timeline, opportunities for public engagement and fiscal impact. Staff and Ms. Hauser responded to questions from Council.

Councilmembers provided comment.

City Council/RSA Agenda 45 Tuesday, January 11, 2022
It was moved by Vice Mayor Patiño and seconded by Councilmember Gacoscos to adopt Resolution No. 5874-21 Approving an Exclusive Negotiating Agreement (ENA) with City Ventures, LLC, for the Sale and Development of a Portion of the Gateway Property, Bounded by AlvaradoNiles Road, Osprey Drive, Old Alameda Creek, and the City Limit Line with Fremont. The motion was carried by a unanimous roll call vote.

7.b. Introduce an Ordinance Adding Section 2.05.050 to Chapter 2.05 “Campaign Reporting Requirements” of the Union City Municipal Code to Require Electronic Filing Of Campaign Statements; and Adopt a Resolution Entering into a Consulting Services Agreement with Granicus, LLC for Software Providing Electronic Filing Capabilities for Campaign Statements and Statements of Economic Interest in an amount not to Exceed $25,000 Anna Brown, City Clerk presented the staff report and responded to question from Council. Councilmembers provided comment.

It was moved by Councilmember Gacoscos and seconded by
Councilmember Singh to:

Introduce an Ordinance Adding Section 2.05.050 to Chapter 2.05 “Campaign Reporting Requirements” of the Union City Municipal Code to Require Electronic Filing Of Campaign Statements; and
Adopt Resolution No. 5875-21 Entering into a Consulting Services Agreement with Granicus, LLC for Software Providing Electronic Filing Capabilities for Campaign Statements and Statements of Economic Interest in an amount not to Exceed $25,000.

The motions were carried by a unanimous roll call vote.

8. SUCCESSOR AGENCY TO REDEVELOPMENT AGENCY - None

9. AUTHORITIES AND AGENCIES - None

10. CITY COMMISSION / COMMITTEE REPORTS - None

11. SCHEDULED ORAL COMMUNICATION - None

12. ITEMS REFERRED BY COUNCIL
Vice Mayor Patiño reported on his attendance of the StopWaste/Waste Management Authority meeting.

Councilmember Singh reported on his attendance of the Union City Youth Commission meeting.

Councilmember Gacoscos reported on her attendance of the Alameda County Housing Authority meeting and the Human Relations Commission retreat.

Councilmember Duncan reported on her attendance of the Joint City Council/School Board Sub-Committee Meeting.

Mayor Dutra-Vernaci reported on her attendance of the Human Relations Commission retreat. The Commission was provided an update on the Point-InTime count for the homeless community by Pedro Naranjo. The information was also provided to the City Council.

City Council/RSA Agenda 46 Tuesday, January 11, 2022
Mayor Dutra-Vernaci reported on her attendance of a joint meeting of the Alameda County Mayors Conference and the Alameda County Board of Supervisors (BOS). Issues surrounding homelessness, including the Point in Time Count, were discussed.

Management Analyst II, Sharon Petrehn, provided an update on the Point in Time Count timeline and process. The count will take place on January 25, 2022 and results are expected in June, 2022.

Mayor Dutra-Vernaci continued her report out of the joint meeting of the Alameda County Mayors Conference and BOS. Another joint meeting will be held in February.

Mayor Dutra-Vernaci reported on her attendance of the Metropolitan Transportation Commission and Alameda County Transportation Commission meetings.

13. GOOD OF THE ORDER
Vice Mayor Patiño reported on his attendance of the Bay Bombs Toy Drive, a cannabis industry webinar hosted by the League of California Cities, and a food distribution event at St. Anne's Church.

Councilmember Singh reported two unhoused persons.

Councilmember Gacoscos wished all Merry Christmas and Happy Holidays.

Councilmember Duncan wanted to recognize the Public Works team for their diligent work during the recent heavy rains.

Mayor Dutra-Vernaci recognized the work and effort of the UCPD for their annual holiday toy drives.

Chief Rinetti made a brief statement on the toy drive and Shop with a Cop event at Wal-Mart. Over 100 children were provided with gifts as a result of the events.

14. CLOSED SESSION - None

15. ADJOURNMENT
Mayor Dutra-Vernaci adjourned the meeting at 9:11 p.m.

Respectfully submitted,
Anna M. Brown, City Clerk
City Council/RSA Agenda 47 Tuesday, January 11, 2022

MINUTES

CITY OF UNION CITY

CITY COUNCIL SPECIAL MEETING
Monday, December 20, 2021
4:00 PM
City Hall - City Council Conference Room
34009 Alvarado-Niles Road
Union City, CA 94587
Consistent with California State Assembly Bill 361, the City Council participated in the Closed Session meeting via phone/video conferencing.

1. CALL TO ORDER
Mayor Dutra-Vernaci called the meeting to order at 4:00 p.m.

Roll Call Present: Councilmembers Duncan, Gacoscos, Singh, Vice Mayor Patiño, Mayor Dutra-Vernaci

Absent: None

2. ORAL COMMUNICATIONS - None

3. CLOSED SESSION

3.a. CONFERENCE WITH LABOR NEGOTIATORS
Gov. Code Section 54957.6
Agency designated representative:

Lilybell Nakamura, Chief Human Resources Officer
Jeff Bailey, IEDA Representative
Employee organization:

Management Employees Group (MEG)
Professional Employees Group (PEG)
Service Employees International Union, Local 1021 (SEIU) Union City Police Management Association (UCPMA)
Union City Police Officers Association (UCPOA)

4. ADJOURNMENT
Mayor Dutra-Vernaci adjourned the meeting at 4:58 p.m. with no reportable action.

Respectfully submitted,
Anna M. Brown, CMC
City Clerk
City Council/RSA Agenda 48 Tuesday, January 11, 2022
Agenda Item
DATE: 1/11/2022
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: KRISTOPHER J. KOKOTAYLO, CITYATTORNEY
ANNA M. BROWN, CITY CLERK
SUBJECT: SECOND READING AND ADOPTION OF AN ORDINANCE ADDING SECTION 2.05.050 TO CHAPTER 2.05 “CAMPAING REPORTING
REQUIREMENTS” OF THE UNION CITY MUNICIPAL CODE TO

REQUIRE ELECTRONIC FILING OF CAMPAIGN STATEMENTS
Staff recommends that the City Council waive reading the full text of the Ordinance, conduct the second reading and adopt the Ordinance adding Section 2.05.050 to Chapter 2.05 “Campaign Reporting Requirements” of the Union City Municipal Code to require electronic filing of campaign statements.

STRATEGIC PLAN ALIGNMENT
GoalA. Financial Stability and Sustainability
Strategy 7: Reduce staff costs and increase staff efficiency by increasing the public’s access to self-service options

BACKGROUND
California Government Code Section 84615 allows local government agencies to adopt an ordinance that requires an elected officer, candidate, committee, or other person required to file Political Reform Act documents, to file online or electronically with the City Clerk.

DISCUSSION
The City Clerk’s office processes approximately 115 statements of economic interests on an annual basis and five campaign statements on a bi-annual basis. In election years, campaign statements fluctuate depending on the number of candidates and committees and the additional pre-election filings. The filers receive initial notifications, reminders, and in some cases requests for amendments.

City Council/RSA Agenda 49 Tuesday, January 11, 2022
When the COVID-19 Pandemic shut down City Hall, the closure to the public created a new challenge as original documents were still required to be filed. Additionalcoordination was necessary to ensure delivery and receipt of the original documents.

In addition to coordinating the filings, Assembly Bill 2151 now requires local government agencies to post campaign statements and reports on the City’s website, within 72 hours of each filing deadline. Before posting, the City Clerk must redact the street name and building number of the persons or entity representatives listed on any statement, report, or document, or any bank account number required to be disclosed by the filer.

The City has entered into an agreement with Granicus, LLC, a vendor approved by the California Secretary of State, to provide an online electronic filing system for campaign disclosure statements and statements of economic interests.

The Ordinance adding Section 2.05.050 to Chapter 2.05 “Campaign Reporting Requirements” enables the City Clerk to accept electronically filed statements, permit the use of an online filing system and designate the filings received electronically by the City Clerk’s Office as the filings of record for the City.

FISCAL IMPACT
There is no fiscal impact associated with adoption of the proposed Ordinance.

RECOMMENDATION
Staff recommends that the City Council waive reading the full text of the Ordinance, conduct the second reading and adopt the Ordinance adding Section 2.05.050 to Chapter 2.05 “Campaign Reporting Requirements” of the Union City Municipal Code to require electronic filing of campaign statements.

The Ordinance will become effective on February 11, 2022.

Prepared by:

Anna M. Brown, City Clerk
Submitted by:

Anna M. Brown, City Clerk
ATTACHMENTS:

Description Type
Ordinance Ordinance
City Council/RSA Agenda 50 Tuesday, January 11, 2022
ORDINANCE NO. XXX-21

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF UNION CITY TO ADD SECTION 2.05.050 TO CHAPTER 2.05 “CAMPAIGN REPORTING REQUIREMENTS”

OF THE UNION CITY MUNICIPAL CODE TO REQUIRE ELECTRONIC FILING OF

CAMPAIGN STATEMENTS
WHEREAS, Government Code Section 84615 currently provides that a local agency may adopt an ordinance to require an elected officer, candidate, committee, or other person required to file statements, reports, or other documents required by Chapter 4 of the Political Reform Act (commencing with Section 84100 of the Government Code), except an elected officer, candidate, committee, or other person who receives contributions totaling less than $2,000 and who makes independent expenditures totaling less than $2,000 in a calendar year, to file those statements, reports, or other documents online or electronically with the local filing officer; and WHEREAS, the City has entered into an agreement with Granicus, LLC, a vendor approved by the California Secretary of State, to provide an online electronic filing system ("System") for campaign disclosure statements; and
WHEREAS, the System will operate securely and effectively and will not unduly burden filers.

Specifically: (1) the System will ensure the integrity of the data and includes safeguards against efforts to tamper with, manipulate, alter, or subvert the data; (2) the System will only accept a filing in the standardized record format developed by the Secretary of State and compatible with the Secretary of State's system for receiving an online or electronic filing; and (3) the System will be available free of charge to filers and to the public for viewing filings; and WHEREAS, the City of Union City desires to amend the Union City Municipal Code to add a new section relating to electronic filing of campaign statements.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF UNION CITY DOES HEREBY ORDAIN AS FOLLOWS:

SECTION 1. Findings. The City Council of the City of Union City finds that all of the above Recitals are true and correct and incorporated herein by reference.

SECTION 2. CEQA. Approval of the ordinance is exempt from environmental review in accordance with California Environmental Quality Act Guidelines section 15061(b)(3), the general exemption for projects with no potential for significant effect on the environment. As a series of text amendments and additions, it can be seen with certainty that there is no possibility that the Municipal Code Amendment will have a significant effect on the environment.

SECTION 3. Municipal Code Amendment. Section 2.05.050, “Electronic Filing,” is hereby added to Chapter 2.05 “Campaign Reporting Requirements” of the Union City Municipal Code as follows:

City Council/RSA Agenda 51 Tuesday, January 11, 2022

2.05.050 Electronic Filing
A. Any elected officer, candidate, committee, or other person required to file statements, reports, or other documents required by Government Code Chapter 4 (commencing with Section 84100), except an elected officer, candidate, committee, or other person who receives contributions totaling less than two thousand dollars ($2,000), and makes expenditures totaling less than two thousand dollars ($2,000) in a calendar year, shall file those statements, reports, or other documents online or electronically with the City Clerk.

B. In any instance in which an original statement, report or other document must be filed with the California Secretary of State and a copy of that statement, report or other document is required to be filed with the City Clerk, the filer may, but is not required to, file the copy electronically.

C. If the City Clerk's electronic system is not capable of accepting a particular type of statement, report, or other document, an elected officer, candidate, committee or other person shall file that document with the City Clerk in an alternative format.

D. The electronic filing system will operate securely and effectively and will not unduly burden filers. Specifically, the electronic filing system will ensure the integrity of the data and includes safeguards against efforts to tamper with, manipulate, alter, or subvert data; the electronic filing system will only accept a filing in the standardized record format developed by the Secretary of State and compatible with the Secretary of State’s system for receiving an online or electronic filing; and the electronic filing system will be available free of charge to filers and to the public for viewing filings.

SECTION 4. Severability. If any provision of this Ordinance or the application thereof to any person or circumstance is held invalid, the remainder of the Ordinance, including the application of such part or provision to other persons or circumstances shall not be affected thereby and shall continue in full force and effect. To this end, provisions of this Ordinance are severable. The City Council hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause, or phrase hereof irrespective of the fact that any one or more sections, subsections, subdivisions, paragraphs, sentences, clauses, or phrases be held unconstitutional, invalid, or unenforceable.

SECTION 5. Publication and effective date. Within fifteen (15) days from and after adoption, this Ordinance shall be published once in the Tri-City Voice, a newspaper of general circulation printed and published in Alameda County and circulated in the City of Union City, in accordance with California Government Code Section 36933. This Ordinance shall take effect and be enforced thirty (30) days after its adoption.

City Council/RSA Agenda 52 Tuesday, January 11, 2022
Agenda Item
DATE: 1/11/2022
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: MARILOU AYUPAN, PUBLIC WORKS DIRECTOR
SUBJECT: ADOPT A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT AMENDMENT NO. 9 TO EXTEND THE UNION

CITY TRANSIT FIXED-ROUTE AND DEMAND RESPONSE OPERATIONS

AND MAINTENANCE AGREEMENT WITH MV TRANSPORATION FOR
AN ADDITIONAL SIX MONTHS THROUGH JUNE 30, 2022
Staff recommends that the City Councilauthorizes the City Manager to execute Contract Amendment No. 9 with MV Transportation (MV) to extend the contract for an additional six months through June 30, 2022.

STRATEGIC PLAN ALIGNMENT
The adoption of this resolution is in response to unforeseen circumstances as a result of the COVID-19 pandemic and is thus not directly related to the City Council’s five-year Strategic Plan. However, it is generally consistent with GoalA of the Strategic Plan to foster fiscal health through cost control.

BACKGROUND
MV has been the operations and maintenance contractor for both Union City Transit and Paratransit since July 1, 2000. MV was awarded the operations and maintenance contract again after a request for proposal (RFP) process with a contract beginning October 3, 2009. Contract optional years and subsequent extensions now expire on December 31, 2021.

On November 29, 2021, MV sent a formal request to the City to continue its transportation partnership for an additional six (6) months. Their proposal includes for consideration an overall 6.0% increase for the last six (6) months of FY 2022 with improved technology that will provide reporting functions and real time customer information.

DISCUSSION
City Council/RSA Agenda 53 Tuesday, January 11, 2022
Staff is presenting a proposal to extend the operating and maintenance contract with MV for an additional six (6) months in response to the ongoing COVID-19 pandemic. Staff is preparing a new RFP for a long-term operations and maintenance contractor but has had to continuously respond to a rapidly changing environment for transit service that has taken precedence over issuing the RFP. An extension allows staff to issue an RFP that enables potential bidders (including MV) the ability to properly evaluate Union City Transit (Fixed-Route), Union City Paratransit (Demand Response), and the Union City Flea (Demand Response Microtransit) as a potential business.

For all Fixed-Route and Demand Response services, MV is paid a monthly flat fee as wellas a variable hourly fee for the actual hours of revenue service provided. MV has submitted a proposal that includes a 4.4% increase to the fixed monthly fees and a 6.9% increase to the variable rate fees, for an overall approximate cost increase of 6.0% for the duration of this six (6) month extension. Calculations in the table below are based on 21,000 Fixed-Route hours and 7,600 Demand Response hours while the increase is to keep Union City Transit drivers’ rates at competitive levels within the region to keep drivers while other operators are hiring to fill massive vacancies. The current and proposed rates are:

FY20 FY21
(Jul-Dec)
FY21
(Jan-Jun)
FY22
(Jul-Dec)
FY22
(Jan-Jun)
Fixed-Route
Monthly Fixed Fee $103,310 $103,310 $113,538 $113,538 $118,549 Variable (Hourly) Rate $47.60 $47.60 $52.33 $54.32 $58.10 Demand Response
Monthly Fixed Fee $21,451 $21,451 $23,575 $23,575 $24,615 Variable (Hourly) Rate $49.03 $49.03 $53.88 $55.93 $59.77 Annual Total $4,073,004 $4,073,004 $4,662,192 $4,776,932 $5,066,672* Six Month Extension Total $2,036,502 $2,331,096 $2,388,466 $2,533,336* *MV’s offer letter in Attachment A uses 19,600 hours for fixed-route service and 6,000 hours for demand response service based on current service levels. Staff recalculated to provide comparable comparison to prior extensions and because service fluctuates to the maximum hours of 21,000 for fixed-route and 7,600 for demand response.

MV will continue to adhere to the terms of the agreement from the current agreement that was approved by City Counciland signed in June 2021.

MV has continued to provide quality service for Union City. They have continued to operate in a safe and professional manner, have been very responsive to the City’s requests and are a cooperative partner in the delivery of the City’s vital transit and paratransit services. By extending the agreement through June 30, 2022, the City will retain a responsible operator while staff administers an RFP process to select the next quality service provider for Union City Transit (Fixed-Route), Union City Paratransit (Demand Response), and the Union City Flea (Demand Response Microtransit).

FISCAL IMPACT
The totalestimated costs for Contract Amendment No. 9 through June 30, 2022 are $2,533,336. The costs are based on six (6) months of service estimated at 21,000 service hours for Union City Transit (Fixed-Route) and 7,600 service hours for Union City Paratransit (Demand Response) and Union City Flea (Demand Response Microtransit). Contract Amendment No. 9 will be funded with $1,931,394 from Account Number 5110-3141- City Council/RSA Agenda 54 Tuesday, January 11, 2022
34002-54114 (Transit Fund – Transit – Transit Operations – Purchased Transportation Contract) and $601,942 from Account Number 5120-3141-34022-54114 (Paratransit Fund – Transit – Paratransit Operations – Purchased Transportation Contract). Funds for this contract were included in the FY 2021-2022 Adopted Budgets of the Transit and Paratransit Funds. There will be no impact on the General Fund.

RECOMMENDATION
Staff recommends that the City Council adopt a Resolution authorizing the City Manager to execute Contract Amendment No. 9 with MV Transportation to extend the agreement through June 30, 2022.

Prepared by:

Steve Adams, Transit Manager
Submitted by:

Marilou Ayupan, Public Works Director
ATTACHMENTS:

Description Type
Resolution Resolution
Exhibit A - Contract Amendment No. 9 Exhibit
City Council/RSA Agenda 55 Tuesday, January 11, 2022
RESOLUTION NO. XXXX-22

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UNION CITY AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACT AMENDMENT NO. 9 TO EXTEND

THE UNION CITY TRANSIT FIXED-ROUTE AND DEMAND RESPONSE OPERATIONS

AND MAINTENANCE AGREEMENT WITH MV TRANSPORTATION FOR AN ADDITIONAL SIX MONTHS THROUGH JUNE 30, 2022
WHEREAS, City Council Resolution 3855-09 approved a Contract Agreement between the City of Union City and MV Transportation to provide the operations and maintenance of Union City Transit and Union City Paratransit beginning October 3, 2009; and WHEREAS, the City Council previously extended the Contract Agreement through June 30, 2013 with Resolution 4269-12, through June 30, 2016 with Resolution 4435-13, through June 30, 2018 with Resolution 4778-15, through June 30, 2020 with Resolution 5216-18, through December 31, 2020 with Resolution 5592-20, through June 30, 2021 with Resolution 5691-20, and again through December 31, 2021 with Resolution 5759-21; and WHEREAS, the current Contract Agreement Extension (Contract Amendment No. 8) expires on December 31, 2021; and
WHEREAS, MV Transportation has submitted a proposal to extend the Contract Agreement for an additional six months through June 30, 2022; and WHEREAS, the City of Union City and MV Transportation mutually wish to extend the Agreement (Contract Amendment No. 9) through June 30, 2022; and WHEREAS, Contract Amendment No. 9 will be funded with $1,931,394 from Account Number 5110-3141-34002-54114 (Transit Fund – Transit – Transit Operations – Purchased Transportation Contract) and $601,942 from Account Number 5120-3141-34022-54114 (Paratransit Fund – Transit – Paratransit Operations – Purchased Transportation Contract). Funds for this contract were included in the FY 2021-2022 Adopted Budgets of the Transit and Paratransit Funds.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Union City hereby authorizes the City Manager to execute Contract Amendment No. 9 with MV Transportation through June 30, 2022 (Exhibit A), funded with $1,931,394 from Transit Fund Account Number 5110-3141-34002-54114 and $601,942 from Paratransit Fund Account Number 5120-3141-34022-54114; and
BE IT FURTHER RESOLVED that the Contract Agreement is amended in the following particulars only:

1. Section 2. Time Period. The term of this Agreement is extended to include the term of January 1, 2022 through June 30, 2022.

City Council/RSA Agenda 56 Tuesday, January 11, 2022
Resolution No. XXXX-21

Page 2 ends

2. Section 3. Maximum Obligation. The maximum obligation through June 30, 2022, shall not exceed $2,533,336 (Two Million, Five Hundred Thirty-Three Thousand, Three Hundred Thirty-Six Dollars). The maximum obligation is based on a fixed monthly cost for administration, an estimated 21,000 (Twenty-One Thousand) fixed-route revenue vehicle service hours and an estimated 7,600 (Seven Thousand, Six Hundred) demand response revenue vehicle service hours.

3. Section 4. Price Formula. The sub-section entitled Fixed-Route Service, is amended, in part, as follows:

Through June 30, 2022, there shall be a fixed cost payment of $118,549 (One Hundred Eighteen Thousand, Five Hundred Forty-Nine Dollars) per month plus a fixed hourly rate per revenue vehicle service hour of $58.10 (Fifty-Eight Dollars and Ten Cents). The maximum obligation shall not exceed $1,931,394 (One Million, Nine Hundred Thirty-One Thousand, Three Hundred Ninety-Four Dollars).

4. Section 4. Price Formula. The sub-section entitled Paratransit Service, is amended, in part, as follows:

Through June 30, 2022, there shall be a fixed cost payment of $24,615 (TwentyFour Thousand, Six Hundred Fifteen Dollars) per month plus a fixed hourly rate per revenue vehicle service hour of $59.77 (Fifty-Nine Dollars and Seventy-Seven Cents). The maximum obligation shall not exceed $601,942 (Six Hundred One Thousand, Nine Hundred Forty-Two Dollars).

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Union City at a regular meeting held on the 11
th day of January 2022, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

APPROVED:

CAROL DUTRA-VERNACI
Mayor
City Council/RSA Agenda 57 Tuesday, January 11, 2022
Resolution No. XXXX-21

Page 3 ends

ATTESTED: APPROVED AS TO FORM:
_________________________ ___________________________
ANNA M. BROWN KRISTOPHER J. KOKOTAYLO
City Clerk City Attorney
City Council/RSA Agenda 58 Tuesday, January 11, 2022
WHEREAS, CITY and CONTRACTOR entered into a transportation services agreement on the 3rd day of October, 2009, hereinafter referred to as “Agreement”; and, WHEREAS, CITY and CONTRACTOR previously extended the Agreement through June 30, 2013, through June 30, 2016, through June 30, 2018, through June 30, 2020, through December 31, 2020, through June 30, 2021, and again through December 31, 2021; and WHEREAS, the current Agreement, as extended, expires on December 31, 2021; and, WHEREAS, CONTRACTOR has submitted a proposal to extend the Agreement for an additional six months through June 30, 2022; and,
WHEREAS, CITY and CONTRACTOR wish to mutually extend the Agreement through June 30, 2022;
NOW THEREFORE, CITY and CONTRACTOR hereby agree that the Agreement is amended to include the following particulars only:

1. Section 2. Time Period. This term of this Agreement is extended to include the term of January 1, 2022 – June 30, 2022.

2. Section 3, Maximum Obligation, through June 30, 2022, the maximum obligation shall not exceed $2,533,336 (Two Million Five Hundred Thirty-Three Thousand Three Hundred Thirty-Six Dollars). The maximum obligation is based on a fixed monthly cost for administration, an estimated 21,000 (Twenty-One Thousand) fixed-route revenue vehicle service hours and an estimated 7,600 (Seven Thousand Six Hundred) demand response revenue vehicle service hours.

3. Section 4, Price Formula, sub-section entitled Fixed-Route Service, is amended in part as follows:

Through June 30, 2022, there shall be a fixed cost payment of $118,549 (One Hundred Eighteen Thousand Five Hundred Forty-Nine Dollars) per month plus a fixed hourly rate per revenue vehicle service hour of $58.10 (Fifty-Eight Dollars and Ten Cents). The maximum obligation shall not exceed $1,931,394 (One Million Nine Hundred Thirty-One Thousand Three Hundred Ninety-Four Dollars).

DocuSign Envelope ID: 74D22822-CB89-4926-85E9-72AC685BC3F1 This Contract Extension to the Agreement between the City of Union City, California, hereinafter referred to as “City” and MV Transportation, Inc., hereinafter referred to as “Contractor” is dated this ____ day of _________________ 202 .

CONTRACT AMENDMENT NO. 9 BETWEEN THE CITY OF UNION

CITY AND MV TRANSPORTATION FOR UNION CITY TRANSIT

FIXED-ROUTE AND DEMAND RESPONSE SERVICES EXTENSION
THROUGH JUNE 30, 2022
City Council/RSA Agenda 59 Tuesday, January 11, 2022

4. Section 4, Price Formula, sub-section entitled Demand Response Service, is amended in part as follows:

Through June 30, 2022, there shall be a fixed cost payment of $24,615 (TwentyFour Thousand Six Hundred Fifteen Dollars) per month plus a fixed hourly rate per revenue vehicle service hour of $59.77 (Fifty-Nine Dollars and Seventy-Seven Cents). The maximum obligation shall not exceed $601,942 (Six Hundred One Thousand Nine Hundred Forty-Two Dollars).

Except as expressly amended herein, all terms and conditions of the Agreement shall remain in full force and effect as originally executed, unless modified in writing signed by both parties.

Joan Malloy, City Manager Marie Meisenbach Graul, Executive CITY OF UNION CITY Vice President and Chief Financial Officer MV TRANSPORTATION, INC.

Date Date
Kristopher Kokotaylo, City Attorney Mark Collins, President and Chief Operating Officer
MV TRANSPORTATION, INC.

Date Date
ATTEST
Anna Brown, City Clerk
DocuSign Envelope ID: 74D22822-CB89-4926-85E9-72AC685BC3F1 12/6/2021
12/6/2021
City Council/RSA Agenda 60 Tuesday, January 11, 2022
City Council/RSA Agenda 61 Tuesday, January 11, 2022
City Council/RSA Agenda 62 Tuesday, January 11, 2022
Agenda Item
DATE: 1/11/2022
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: MARILOU AYUPAN, PUBLIC WORKS DIRECTOR
SUBJECT: ADOPT RESOLUTION AUTHORIZING THE CITY MANAGER TO

EXECUTE A CONSULTING SERVICES AGREEMENT WITH MARK
THOMAS & COMPANY, INC. FOR PRELIMINARY ENGINEERING (30% DESIGN) OF PHASES (SEGMENTS) 1 AND 2 FOR QUARRY LAKES
PARKWAY (EAST WEST CONNECTOR), CITY PROJECT NO. 18-04, IN THE AMOUNT OF $1,200,000
Staff recommends that the City Council adopt the attached resolution authorizing the City Manager to execute a Consulting Services Agreement with Mark Thomas & Company, Inc. for Preliminary Engineering (30% Design) of Phases (Segments) 1 and 2 for Quarry Lakes Parkway (East West Connector), City Project No. 18-04, in the amount of $ 1,200,000.

STRATEGIC PLAN ALIGNMENT
This agenda item is in alignment with the following:

Goal C, Strategy 3: Facilitate the build out of the greater Station District Area through the construction of Quarry Lakes Parkway, upgrades to the BART Station, completion of the pedestrian railcrossing and sale and development of City-owned land.

BACKGROUND
At the November 19, 2020 Alameda County Transportation Commission (Alameda CTC) Meeting, Alameda CTC staff in partnership with Union City staff, presented the findings of the QLP project. Following Alameda CTC staff’s recommendation, the full Commission adopted a resolution to:

1. Commit the remaining balance of 1986 Measure B funding for the East West Connector (I-880 to Mission Blvd) Project to the Quarry Lakes Parkway Project ($69.0 Million) sponsored by Union City and acknowledging that the commitment fulfills the 1986 Measure B funds from the 1986 Transportation City Council/RSA Agenda 63 Tuesday, January 11, 2022
Expenditure Plan;

2. Allocate $4.2 Million of 1986 Measure B funds to design phases of Phase 1 (7 th Street Connection) for
$2.0 Million and Phase 2 (Gateway Connection) for $2.2 Million;

3. Allocate $17.8 Million of 1986 Measure B funds to design phases of Phase 3 (11 th Street Connection)
for $9.2 Million and Phase 4 (Grade Separations & Alvarado-Niles Connection) for $8.6 Million with the condition that full funding for all phases of the segment will be identified in the funding agreement;

4. Authorize the Executive Director or designee of the Executive Director, to execute a project funding agreement, or agreements, with the City of Union City for the design phases of Phases 1, 2, 3 and 4 of the Quarry Lakes Parkway Project up to the amount allocated in the design phases for each segment.

On September 7, 2021, Union City received Alameda CTC Project Funding Agreement (PFA) No. A22-0053, in the amount of $4.2 Million, to fund 100% of the cost for Final Design Services of Phases (Segments) 1 and 2 for the Quarry Lakes Parkway Project, City Project No. 18-04.

On October 12, 2021, City Council adopted Resolution No. 5842-21 accepting the $4.2 Million grant from Alameda CTC’s PFA No. A22-0053 and authorizing the use of those funds for Final Design of Phases (Segments) 1 and 2 for the Quarry Lakes Parkway (East West Connector) Project, City Project No. 18-04.

Other actions included:

1. Increasing the FY 2021/22 revenue projection in Account Number 4100-91804-44502 (Capital Projects Fund - Misc. County/Local Grants) by $4.2 Million.

2. Amending the FY 2021/22 Capital Projects Fund budget by appropriating $4.2 Million to Account Number 4100-3199-91804-54110 (Capital Projects Fund - Quarry Lakes Parkway (East West Connector) – Professional Services) for Final Design Services of Phases (Segments) 1 and 2 for the Quarry Lakes Parkway (East West Connector) Project, City Project No. 18-04.

These Alameda CTC and City Council approvals set the framework for the release of a Request for Proposal (RFP) to select a civil engineering consultant with Local Streets & Roads, Complete Streets and Municipal Engineering experience through Final Design, Right of Way and Construction administered by local public agencies for City Project No 18-04.

DISCUSSION
Projects funded with Alameda County’s voter approved Measure B, Measure BB and Measure F (Vehicle License Fees) funds are required to apply Alameda CTC’s Local Business Contract Equity (LBCE) Program.

On October 14, 2021, a notification that the upcoming RFP for Preliminary Engineering (30% Design) of Phases 1 and 2 for Quarry Lakes Parkway, City Project No. 18-04, would be available on the City’s website on October 19, 2021 was emailed to all potential Prime Consultant and Subconsultant firms on the Alameda CTC’s Certified Firms List dated October 1, 2021. This Certified List identifies firms that are registered by Alameda CTC as a LBE (Local Business Enterprise), SLBE (Small Local Business Enterprise) or VSLBE (Very Small Local Business Enterprise).

On November 9, 2021, a Pre-Proposal Meeting and “Meet the Primes” event was held at Studio 11 for interested Prime Consultant and Subconsultant firms. The City presented a project overview of Quarry Lakes Parkway and Decoto Complete Streets in Union City and Fremont along with defined project elements of Phase 1 and Phase 2. Also discussed was the Alameda CTC’s LBCE Program and the goals for professional services contracts (70% LBE and 30% SLBE), see Attachment D. There were twenty (20) attendees; a majority were Alameda CTC certified LBE firms and a few were Alameda CTC SLBE firms, see Attachment E. The “Meet the Prime” Event allowed four (4) potential Prime Consultant firms to meet subconsultant firms with various technical expertise (hydraulics/hydrology, roadway drainage, geotechnical, hazardous materials, City Council/RSA Agenda 64 Tuesday, January 11, 2022
utilities, structures, traffic signal, street lighting and landscape/urban planning) to discuss the opportunity of being part of the Prime Consultants’ team.

On November 23, 2021, the City received one (1) proposal for the Preliminary Engineering (30% Design) of Phases 1 and 2 for Quarry Lakes Parkway, City Project No. 18-04, from Mark Thomas & Company, Inc. (Mark Thomas) of Oakland, CA, see Attachment C. Follow up discussions with the three (3) potential prime consultant firms that ultimately decided not to submit a proposal indicated that their excitement and interest was for the future work on the Final Design of Phase 3, 11
th Street Connection, and Phase 4, Alvarado-Niles Road
Connection. These phases include the complicated and challenging engineering design of grade separation structures (railroad bridges) allowing Quarry Lakes Parkway to go under the existing BART and two (2) UP tracks (Oakland and Niles Subdivisions).

On December 9, 2021, a Consultant Presentation and Interactive Technical Interview was held at Studio 11 with the Mark Thomas team and the Evaluation Panel comprised of city staff from the City Manager’s Office, the Economic and Community Development Department, the Public Works Department, and Union City Transit, as well as a Bicycle and Pedestrian Advisory Committee (BPAC) member and a potential developer.

After the seventy-five (75) minute presentation and interactive technical interview, the Evaluation Panel determined that Mark Thomas and their subconsultant team presented a well-organized, technical presentation and provided highly qualified responses to engineering issues related to Complete Streets design, roadway drainage, hydrology, hydromodification, water quality, understanding of utilities within Public Right of Way and coordination with adjacent development, see Attachment B, and unanimously made the recommendation to select the Mark Thomas team for the project.

The Scope of Services for Preliminary Engineering (30% Design) is to develop a basis for final design for the Quarry Lakes Parkway (QLP) based on utilizing the 2011 previously completed East West Connector (EWC) project plans (65%). Mark Thomas and their subconsultants will review EWC project design which includes CAD drawing files, engineering calculations and technical reports to recommend how to best update the EWC project plans to the City’s current vision for QLP to be a complete multi-modal transportation corridor to carry local bus, deliveries, motor vehicles, bicycle, and pedestrian including underground utilities to complete the Station District Plan.

A series of coordination meetings with Alameda County Flood Control and Water Conservation District is expected to evaluate the hydrology, hydromodification and water quality related to the roadway drainage and storm drain runoff within the entire project area. Coordination with staff from Fremont, AC Transit, Caltrans, Regional Water Quality Control Board, and other resources agencies along with all the utility companies will also be required.

Once this Preliminary Engineering task is completed, the Consultant Team will have a better understanding of the complexities of this project and will be able to prepare a fair, detailed Scope of Work and Cost Proposal to complete Final Design. The Preliminary Engineering Phase is expected to be completed by this summer with Final Design anticipated to be completed by December 2023.

The Consulting Services Agreement with Mark Thomas & Company, Inc. for Preliminary Engineering (30% Design) of Phase 1 and 2 for Quarry Lakes Parkway, City Project No. 18-04, is estimated at $1,200,000, see Exhibit A.

Whereas the 70% LBE goal for professional services contracts is realistic, the 30% SLBE goal has become very challenging to meet in recent years due to the decrease in the number of the available Certified SLBE firms. This has been caused by several factors, including by SLBE firm closures during the COVID-19 pandemic and acquisitions of SLBE firms by large engineering firms. For example, WRECO, Inc. was one of the SLBE firms who was recently acquired by HDR, Inc. WRECO had the technical expertise in hydraulic and roadway drainage required for this complex project, but no longer qualified as SLBE. The City has City Council/RSA Agenda 65 Tuesday, January 11, 2022
complied with Alameda CTC’s LBCE program requirements and the resulting contract is anticipated to achieve about 85% LBE (above the 70% goal) and about 27% SLBE (below the 30% goal). See Attachment A, Alameda CTC’s Form B4: LBCE Program Participation Summary for the Mark Thomas’ consultant agreement.

FISCAL IMPACT
The $4.2 Million in 1986 Measure B grant funds as identified in the Alameda CTC PFA No. A22-0053, executed on September 7, 2021, will fund 100% of the cost for Final Design Services of Phases (Segments) 1 and 2 for the Quarry Lakes Parkway Project.

The initialcost of $1,200,000 for the Consulting Services Agreement with Mark Thomas & Company, Inc. for Preliminary Engineering (30% Design) of Phases (Segments) 1 and 2 for the Quarry Lakes Parkway Project, City Project No. 18-04, will be funded from Capital Projects Fund Account Number 4100-3199-91804-54110 (Capital Projects Fund - Quarry Lakes Parkway (East West Connector) – Professional Services). The remaining $3.0 Million will be used for the upcoming contract amendment to complete the Final Design of Phases 1 and 2.

The total Project Cost for Phase 1, which includes Final Design, Right of Way and Construction, is $16.7 Million and the total Project Cost for Phase 2, which includes Final Design, Right of Way and Construction, is $20.3 Million, and are completely funded with 1986 Measure B funds.

There will be no fiscal impact to the General Fund.

RECOMMENDATION
Staff recommends that the City Council adopt the attached resolution authorizing the City Manager to execute a Consulting Services Agreement with Mark Thomas & Company, Inc. for Preliminary Engineering (30% Design) of Phases (Segments) 1 and 2 for Quarry Lakes Parkway (East West Connector), City Project No. 18-04, in the amount of $1,200,000.

Prepared by:

Marilou Ayupan, Public Works Director
Submitted by:

Marilou Ayupan, Public Works Director
ATTACHMENTS:

Description Type
Attachment A - FormB4 LBCEProgramSummary Attachment
Attachment B- MTCo QLP Technical Presentation Attachment Attachment C- Mark Thomas Proposal Attachment
Attachment D- QLP Preproposal& Meet the Primes Presenation Attachment Attachment E- QLP Preproposal List ofAttendees Attachment Resolution - Execute MTCo Agreement for QLP Ph 1&2 Resolution Exhibit A - Mark Thomas QLP Ph 1-2 Final PSECSA Exhibit City Council/RSA Agenda 66 Tuesday, January 11, 2022
Public Comment Attachment
City Council/RSA Agenda 67 Tuesday, January 11, 2022
City Council/RSA Agenda 68 Tuesday, Jan
Quarry Lakes Parkway
Phases 1 & 2
December 9, 2021
City Council/RSA Agenda 69 Tuesday, January 11, 2022
94 years in business
280+
team members
100%
employee-owned
11 offices
#10
ENR top CA transportation firm
5,000+ projects delivered
Meet Mark Thomas
City Council/RSA Agenda 70 Tuesday, January 11, 2022
Meet Our Team
Shawn O’Keefe,

PE, QSD
Project Manager
Danielle Sanchez,

PE, QSD
Deputy Project
Manager
Sasha Dansky,

PE, QSD
Principal
Joe Streeper, PE,
QSD
Drainage
Robert Stevens,
PE, TE
Utilities
Bobby Lin, PE
Civil Lead
(not in attendance)
Mike Cooper, PE
QA/QC
(not in attendance)
City Council/RSA Agenda 71 Tuesday, January 11, 2022
Team
Organization
East-West Connector
City Council/RSA Agenda 72 Tuesday, January 11, 2022
Why the Mark Thomas Team?
Decoto Road CorridorFremont• Complete streets design• Transit only lanes• EWC Project – Segment A• Multiple stakeholders• Revised concept to final design Soquel Drive Bike LanesSanta Cruz County• Complete streets design• TSP and adaptive signal technologies• Multiple stakeholders• Project concept to final design• Caltrans encroachment permit City Council/RSA Agenda 73 Tuesday, January 11, 2022
Charleston-Arastradero Corridor
Palo Alto• Complete streets design• Multiple phases• Project concept to final design• Caltrans encroachment permit• Robust public outreach City Council/RSA Agenda 74 Tuesday, January 11, 2022
Charleston Corridor Phases 2 & 3
Mountain View• Complete streets design• Transit only lanes• Multiple stakeholders• Multiple phases• Project concept to final design UC Davis West Village ConnectivityDavis• Complete streets design• Preliminary to final design• Caltrans encroachment permit City Council/RSA Agenda 75 Tuesday, January 11, 2022
City Council/RSA Agenda 76 Tuesday, January 11, 2022
Hydrology and Drainage
Approach and Innovative Solutions
City Council/RSA Agenda 77 Tuesday, January 11, 2022
Requirements Overview
 Roadway Drainage
 Flood Control
 Regional Municipal Permit
C3 Stormwater Treatment
(site design features, LID)
C3.g Hydromodification
City Council/RSA Agenda 78 Tuesday, January 11, 2022
Flood Control
• Line M & Line M Bypass• New Basin• Old Alameda Creek and main Flood Control Channel City Council/RSA Agenda 79 Tuesday, January 11, 2022
Stormwater Treatment
• Required to treat stormwater runoff when adding new pavement or reworking existing pavement
• Treatment features: biofiltration swales, biofiltration strips, treatment basins
• Methodology including the 4% rule
City Council/RSA Agenda 80 Tuesday, January 11, 2022
Hydromodification

WHAT WHY HOW
• Adding new pavement
increases runoff flows
• Increased flows causes
creek erosion
• Erosion becomes sediment,
a “pollutant”
• Adding new pavement increases runoff
flows
• Long range rainfall data• Storms we analyze: from 10% of the 2- year peak flow, to the 10-year peak flow
• Cannot exceed pre-project rates by more
than 10% for more than 10% of the record duration
City Council/RSA Agenda 81 Tuesday, January 11, 2022
Bay Area Hydrology Model (BAHM)
BAHM compares the pre-project to the mitigated (post) project Many tools available – all require some
amount of detention
City Council/RSA Agenda 82 Tuesday, January 11, 2022
New Ideas for this Project

1. Use all available tools in
BAHM

2. Reduce or eliminate large
detention basins – but how?

HYDROMODIFICATION
City Council/RSA Agenda 83 Tuesday, January 11, 2022
New Ideas for this Project
City Council/RSA Agenda 84 Tuesday, January 11, 2022
New Ideas for this Project
• Basins may not be needed for “dual use” (stormwater quality AND hydromod)• Detain water in the Old Alameda Creek for hydromodification• Include all bioretention swales in BAHM analysis City Council/RSA Agenda 85 Tuesday, January 11, 2022
Q&A
City Council/RSA Agenda 86 Tuesday, January 11, 2022
New Utility Corridor
Approach and Concept
City Council/RSA Agenda 87 Tuesday, January 11, 2022
Developing the ‘Gateway’
City Council/RSA Agenda 88 Tuesday, January 11, 2022
Infrastructure Needs
 Potable water supply served by Alameda County
Water District
 Sanitary sewer services provided by the Union
Sanitary District
 Electrical and communications systems provided by
Pacific Gas and Electric (PG&E), Comcast, AT&T, aswell as potential new entrants into the marketplacesuch as Wave and Sonic.  Storm drain system operated by the City in a new
main along Quarry Lakes Parkway.

Water
Sewer
City Council/RSA Agenda 89 Tuesday, January 11, 2022
Coordination with Public Utilities
Fremont Bank
Path to Transit
City Council/RSA Agenda 90 Tuesday, January 11, 2022
Q&A
City Council/RSA Agenda 91 Tuesday, January 11, 2022
Complete Streets Design
Approach and Concept
City Council/RSA Agenda 92 Tuesday, January 11, 2022
Latest Bike/Ped Concepts
City Council/RSA Agenda 93 Tuesday, January 11, 2022
Guidance
• NACTO Guides• Union City Pedestrian
& Bicycle Master Plan
• AASHTO Bicycle
Facilities
• Caltrans HDM (DIB 89)
& CA MUTCD
City Council/RSA Agenda 94 Tuesday, January 11, 2022
Protected Intersections
City Council/RSA Agenda 95 Tuesday, January 11, 2022
City Council/RSA Agenda 96 Tuesday, January 11, 2022
Lessons Learned
Complete Streets• Maintenance and access• Other curb usage• Plan for drainage early Protected Intersections• Setbacks to meet sight distance triangles
• Design for most vulnerable user• Tailor treatment for each specific intersection
City Council/RSA Agenda 97 Tuesday, January 11, 2022
Quarterly BPAC Updates
• Presenting to BPACs regularly is
common
• Specific experience presenting to
Union City’s BPAC meetings
City Council/RSA Agenda 98 Tuesday, January 11, 2022
Q&A
City Council/RSA Agenda 99 Tuesday, January 11, 2022
Quality Control/Quality
Assurance
Proven Results
City Council/RSA Agenda 100 Tuesday, January 11, 2022
Quality Management Manuals
City Council/RSA Agenda 101 Tuesday, January 11, 2022
Project
Specific Quality Plan
City Council/RSA Agenda 102 Tuesday, January 11, 2022
Experienced QA/QC Manager
Mike Cooper, PE• Over 40 years of experience• Extensive Complete Streets Design and land development experience
• Recently completed a greenfield roadway
extension project in Morgan Hill
• Spearheaded the development/update of the
Mark Thomas Quality Management Plans
City Council/RSA Agenda 103 Tuesday, January 11, 2022
Why the Mark Thomas Team?
Unmatched project understandingNo learning curveCurrently working on EWC Segment A (Decoto Corridor)Unparalleled complete streets design experience Local community tiesDedicated and available project resourcesExperience in coordination and delivery of major private developments City Council/RSA Agenda 104 Tuesday, January 11, 2022
Q&A
City Council/RSA Agenda 105 Tuesday, January 11, 2022
UNION
CITY
QUARRY
LAKES

PARKWAY
Phase 1 (7th Street Connection) and
Phase 2 (Gateway Connection)
City Project No. 18-04
UNION
CITY
City Council/RSA Agenda 106 Tuesday, January 11, 2022
(510) 844-5600
456 8TH STREET, SUITE 200B
OAKLAND, CA 94607 MARKTHOMAS.COM
November 23, 2021
Marilou R. Ayupan, PE
Public Works Director
City of Union City
34009 Alvarado-Niles Road
Union City, CA 94587
Re: Project No. 18-04 – Quarry Lakes Parkway Multimodal Transportation Corridor Dear Marilou,
The City has a clear vision for the Quarry Lakes Parkway (QLP) project as a community-oriented Complete Street.

Mark Thomas is proud to have been a part of your team to re-envision the parkway. We are excited to submit this proposal for moving the project forward through the 30% design of Phases 1, 2, 3 and 4. We would very much like to be your trusted partner through the preliminary design, through PS&E of Phases 1 and 2, and to see the project constructed to support development of a vibrant Station District. » About our Firm. Mark Thomas is a recognized leader in multimodal transportation planning, design, and delivery. Our experience spans from local streets and intersections, new and improved arterials, to innovative interchange and highway designs. At Mark Thomas, solving challenges gives our work meaning. » What We Do. As a leader in complete streets design, we bring key expertise in Class I paths and trails, Class II bike lanes, Class IV protected bikeways, protected intersections, bike boxes, bicycle signal heads, dedicated bus lanes, bus boarding islands, sidewalks and amenities, curb ramps, ADA compliance, along with drainage and landscaping for green infrastructure. We’re adept at technology that smooths operations such as Transit Signal Priority (TSP) and Adaptive Traffic Signals (ATS).
» Relevant Experience. Our project experience and references highlight recent and relevant complete streets projects that are in construction, or the late phases of design. Our work on Fremont’s Decoto Road complete streets project and interchange is also relevant as a segment of EWC. » Team Continuity. Our team features Shawn O’Keefe as project manager, Danielle Sanchez as deputy project manager, and multiple subconsultants from the EWC project to provide continuity. These include AECOM, PGAdesign, HDR|WRECO, Kittelson, Fugro, ICF, ARWS. ROMA Design is also on standby for continuity with the Station District.
» Informed Technical Approach. Our approach is based on our unique experience helping the city re-envision, scope, and phase the project. We’re proactive, communicative, and collaborative problem solvers. Our proposal outlines the issues and potential solutions to the project’s many challenges.

Thank you for the opportunity to submit this proposal. Please feel free to reach out should you have any questions.

I can be reached through my cellphone (925) 858-8581 and/or email at [email protected].

Sincerely,
MARK THOMAS & COMPANY, INC.

Shawn O’Keefe
Project Manager
City Council/RSA Agenda 107 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 2 ends

Mark Thomas provides civil and structures engineering, surveying, landscape architecture, planning, construction management, and funding support services to clients throughout California. Since the company’s founding in 1927, we have focused on providing excellent client service and delivering projects with a tailored approach to meet our clients’ goals. Our reputation is realized through more than 280 team members in offices that are strategically located to support our communities statewide.

Local Organizational Structure
Currently, we maintain four offices in the Bay Area – our firm headquarters at 2833 Junction Avenue in San José, 20863 Stevens Creek Boulevard in Cupertino, 456 8th Street in Oakland, and 2121 N California Boulevard in Walnut Creek.

These offices are managed by two principals with more than 80 combined staff.

Financial Stability
As a privately owned company, we are positioned to ride out the financial downturns that impact larger, publicly traded companies in our industry. Mark Thomas is rated financially strong by Dun & Bradstreet and has never borrowed or used our line of credit ($1.5 million) to maintain company operations.

Mark Thomas has not had any bankruptcy, unplanned office closures, and/or impending mergers that would impede our ability to complete this project. Our gross revenue has experienced steady growth in the past years, $42 million in 2018, $51 million in 2019, and $65 million in 2020.

Litigation
Mark Thomas operates throughout California and has had average annual billings over the last five years in excess of $49 million. Our claim history is consistent with a company of our size. There are no claims pending against the company or any of our subconsultants that would impact its ability to perform its contractual duties if awarded a contract.

Mark Thomas has been named in a few litigations within the past five years including the State College Boulevard Grade Separation involving a car accident at the intersection of Kimberley Drive and Acacia Avenue (closed through settlement), SBCAG Route 101/154 North interchange involving a cyclist who was injured in a bicycle accident on Highway 154 near Zaca Station Road (closed through settlement), and Marin Sonoma Narrows B3 for wrongful death due to a construction phase traffic accident (still under investigation). 1927
year founded
CA
corporation
94 years in business
280+
employees
#10
ENR top CA
transportation firm
>5k
projects delivered

P R O F I L E

OF THE FIRM
100+
completed active
transportation
projects
City Council/RSA Agenda 108 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 3 ends

WHAT WE DO
Mark Thomas is a recognized leader in multimodal transportation planning, design, and delivery. Our experience spans from local streets and intersections, new and improved arterials, to innovative interchange and highway designs.

At Mark Thomas, we embrace the challenges of every project and dive into the issues of sustainability, safety and comfort for all ages and abilities, transit accessibility and reliability, operations for local and regional vehicular traffic, facility maintenance, adjacent land uses, and constructability. Our breadth of experience from streets to highways shows our ability to successfully deliver complex, multidisciplinary, multi-phase, multi-stakeholder projects.

Complete Streets
Mark Thomas has been at the forefront of complete streets design. Our team brings key expertise in Class I paths and trails, Class II bike lanes, Class IV protected bikeways, protected intersections, bike boxes, bicycle signal heads, dedicated bus lanes, bus boarding islands, sidewalks and amenities, curb ramps and ADA compliance, along with drainage and landscaping for green infrastructure. We’re adept at technology that smooths operations such as Transit Signal Priority (TSP) and Adaptive Traffic Signals (ATS). Our projects become lively community plazas, connect major bicycle and pedestrian corridors to key destinations, and enhance mobility, connectivity, transit reliability, and safety. We know these projects involve regular community engagement to understand resident concerns and user preferences.

Working with Broad Project Teams
We have extensive experience delivering local agency roadway improvements that involve coordination with a multitude of stakeholders, including residential, commercial, and mixed-use developers. Our designs reduce right of way impacts to developable lands while providing the needed infrastructure improvements that support development. We’ve collaborated with Union Pacific Railroad (UPRR), BART, State and federal resource agencies, and delivered projects with Caltrans oversight. Such projects have involved new roadway alignments and widenings, bridges over rail and waterways, as well as highway and interchange projects. These projects also include wet and dry utility design and incorporation of green infrastructure.

Q UA L I F I C AT I O N S

OF THE FIRM
Over the past several years, Mark Thomas
partnered with the City to transform the
former East-West Connector concepts
into the vision of a vibrant, multimodal
neighborhood corridor, renamed as Quarry
Lakes Parkway. As a partner to the City
and through our experience on different
multimodal corridors in the area, we have
an unmatched understanding of the City’s
vision and goals for the project, as well as
the project’s issues and challenges.

East-West Connector Reimagined
We design infrastructure
that supports development,
provides a sense of
community, enhances
local circulation, and
accommodates local and
regional traffic.

City Council/RSA Agenda 109 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 4 ends

PROJECT EXPERIENCE AND REFERENCES
Below are representative projects which demonstrate our ability to successfully design and deliver projects with challenges and benefits that are similar to Quarry Lakes Parkway.

Project Status & Schedule
Schedule by Phase
Planning/Environmental Complete
Final Design Complete in Spring 2022
Right-of-Way Complete in Fall 2022*
Construction Spring 2023-Summer 2024*

DECOTO ROAD

CORRIDOR PROJECT

DECOTO RD
Alameda Creek

PASEO PADRE PKWY

FREMONT BLVD

INTERSTATE
880
Fischer
Park
Ardenwood Historic
Farm Regional Preserve
Lakeshore
Park
Patterson
Park
Crandel Creek
Park
Northgate Community
Park
84 Project Location Map
To Peninsula/South Bay
via Dumbarton Bridge
To Union City BART Station

DECOTO ROAD

COMPLETE STREETS

PROJECT
Project Cost & Funding
Cost Estimate by Phase ($x1000)
Final Design $1,500
Right-of-Way $2,000
Construction $25,000
Total Cost:

Funding Sources ($x1000)
Alameda CTC (Measure B) $3,500
State (LATIP) $16,400
MTC (RM3/Dumbarton, proposed) $8,600
Total Revenues: $28,500
Partners & Stakeholders
*Schedule subject to funding availability
See the updated
Project Concept Plan
completed in December
2020.
$28,500

CLIENT REFERENCE
Connie Wong
City of Fremont
(510) 494-4782
[email protected]

KEY STAFF
Shawn O’Keefe

RELEVANCE TO QLP
• Project Concept to Final Design
• Multimodal Complete Street
• Multiple Stakeholders

PROJECT STATUS
100% Design

DECOTO ROAD CORRIDOR IMPROVEMENTS
Fremont
Mark Thomas is working with the City of Fremont to deliver two critical phases for the Decoto Road Corridor Project. Phase A will be the development of a multimodal corridor concept plan from Mission Boulevard to I-880 and then complete final design documents for the segment from Paseo Padre Parkway to I-880. It will improve safety and enhance multimodal mobility and connectivity on Decoto Road. Phase A is a part of the East West Connector Segment A and is using the previously approved EIR for the project CEQA clearance.

Phase B will be the preparation of a Project Initiation Document (PSR-PDS) for the I-880/Decoto Road Interchange. It will include the realignment of ramps for safety, implementation of continuous bike facilities and ADA-compliant sidewalks with enhanced crossings through the interchange, upgrading traffic signals at multiple off-ramps and facilitating an efficient transition from Decoto Road to the east of I-880 to the SR 84 HOV lane.

Mark Thomas is working with stakeholders to gain consensus on the multimodal corridor plan as well as identify project issues for the interchange project. Stakeholders include the City of Fremont, Caltrans, Union City, AC Transit, MTC, Alameda CTC, ACFC, Dumbarton Rail, and Fremont Mobility Commission.

Shawn O’Keefe is the project manager for the multi-disciplinary project team for Phase A of the Decoto Road Corridor project.

City Council/RSA Agenda 110 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 5 ends

CLIENT REFERENCE
Holly Boyd
City of Palo Alto
(650) 329-2612
[email protected]

KEY STAFF
Shawn O’Keefe

RELEVANCE TO QLP
• Project Concept to Final Design
• Multimodal Complete Street
• Transit
• Phasing

PROJECT STATUS
In Construction

CHARLESTON-ARASTRADERO CORRIDOR

IMPROVEMENTS
Palo Alto
Mark Thomas developed the project concept, obtained environmental clearance, prepared an implementation phasing plan and final design documents. The 2.3 mile Charleston-Arastradero Corridor Improvement Project transformed this automobile-dominated facility into a vibrant Complete Streets facility that equally serves all modes of travel. The project implemented improvements that enhanced pedestrian and bicyclist safety, reduced vehicle speeds, and enhanced the visual environment through the corridor.

Mark Thomas developed multiple design alternatives making use of state-of-the-art Complete Streets concepts. The preferred alternative provided features that enhance pedestrian and bicyclist safety, including Class II buffered bike lanes, bike boxes, multi-use trails, Class IV cycle tracks raised medians and curb bulb-outs.

Shawn O’Keefe serves as the project manager for this project. He is leading a multi-disciplinary team to successfully deliver this project from project concept to final design and design support during construction.

City Council/RSA Agenda 111 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 6 ends

PROJECT SUBMISSION DATE

PREPARED FOR
County of Santa Cruz
MARCH 4, 2021 SOQUEL DRIVE BUFFERED

BIKE LANES AND

CONGESTION MITIGATION

CLIENT REFERENCE
Russell Chen
County of Santa Cruz
831-454-2160
[email protected]

KEY STAFF
Shawn O’Keefe

RELEVANCE TO QLP
• Preliminary Engineering to Final
Design
• Multimodal Complete Street
• Multiple Stakeholders

PROJECT STATUS
65% Design

SOQUEL DRIVE BUFFERED BIKE LANES AND

CONGESTION MITIGATION PLAN
Santa Cruz County
Mark Thomas is preparing the final design, environmental clearance, and permitting for the Soquel Drive Buffered Bike Lanes and Congestion Mitigation Project. This project spans over five miles and will include adaptive traffic signal control/transit signal priority, separated bikeways, 46 green bike boxes and crosswalk upgrades, pavement rehabilitation, and RRFB installation and curb ramp upgrades.

Soquel Avenue/Drive provides an alternative vehicular route to Highway 1 and experiences traffic congestion and higher vehicle speeds that are frequently associated with cut-through traffic. The corridor serves as the primary route for active transportation on the inland side of Highway 1 and transit buses provide access to residences, businesses, and schools.

Through this project, the County aims to improve safety for all modes of transportation, reduce traffic congestion, decrease incidence of collision, and improve transit reliability. It will enhance multimodal options and connectivity to increase corridor throughput and reduce greenhouse gas emissions as well as promote sustainable development and livable communities.

Shawn O’Keefe is the project manager for this fast tracked project. In order to meet the short turnaround deadline, Shawn maintained an aggressive delivery schedule, identified right of way and utility issues early on, began preliminary corridor design immediately, and synthesized existing and forward looking signal technologies.

City Council/RSA Agenda 112 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 7 ends

CLIENT REFERENCE
Kevin Tsoi
Google
(650) 314-8978

KEY STAFF
Shawn O’Keefe

RELEVANCE TO QLP
• Project Concept to Final Design
• Multimodal Complete Street
• Transit
• Phasing

PROJECT STATUS
95% Design
CHARLESTON CORRIDOR PHASES 2 AND 3
Mountain View
Mark Thomas developed the project concept, obtained environmental clearance, and is preparing final design documents for the Charleston Corridor Improvements Phases 2 and 3. The project continues the transformation of Charleston Corridor within the City of Mountain View and realizes the vision of a true multimodal complete street as envisioned in the City’s North Bayshore Precise Plan. The project entails the design and construction of one and two-way cycle tracks along the north and south sides of Charleston Road. The cycle tracks are separated from the road by landscaped medians. The project reconfigures the existing roadway, medians, traffic signals, underground utilities and sidewalks to accommodate the proposed cycle tracks and converts the outside lane in each direction to transit only use. The project incorporates TSP to enhance bus transit reliability.

Shawn O’Keefe serves as the project manager for this project. He is leading a multi-disciplinary team to successfully deliver this project from project concept to final design.

City Council/RSA Agenda 113 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 8 ends

Hale Avenue Extension, Morgan Hill
Mark Thomas is designing the extension of this arterial street from West Main Street to Spring Avenue, which
will provide a long needed bypass for traffic around
downtown Morgan Hill. The proposed improvements
include a roundabout at West Dunne Street, two
stormwater detention basins, landscaping, sound walls,
a new traffic signal, street lights and landscaped median island. Significant retaining walls are required to conform to existing ground adjacent to the new street. Mark
Thomas is also providing Environmental Permitting and
right of way surveying for acquisition of right of way and slope easements from 14 parcels. The project is now in
construction.

El Cerrito Del Norte BART Station, El
Cerrito
Mark Thomas completed the final design of the El
Cerrito Del Norte BART Station project which included
the concourse, bus stops and platforms, landscape and
irrigation and parking lot redesign. As part of these
services, Mark Thomas prepared storm water design in
compliance with C.3 requirements, performed bicycle
and pedestrian circulation analysis, relocated the
passenger drop off lane, analyzed and modified bus
circulation movements.

Mark Thomas was responsible for the coordination and
approvals necessary with the City of El Cerrito and BART and coordinated closely with the City’s’ adjacent Ohlone Greenway Project.

UC Davis West Village Connectivity,
Davis
Mark Thomas prepared preliminary and final design
documents for several critical transportation improvement projects in the West Village area of the UC Davis campus.

The projects will widen the bike and pedestrian pathway and adding lighting along the south side of Russell
Boulevard between Arthur Street and LaRue Road, modify
the bike path and extending connections from the West
Village to the pedestrian overcrossing at Acer Street, add a 12-inch domestic waterline to the existing pedestrian overcrossing of Highway 113, widen the pedestrian
pathway from the pedestrian overcrossing to Orchard
Park Drive, construct a traffic circle at Orchard Park
Circle and Orchard Park Drive, alter the existing two lane vehicle roundabout at the West Village to a single lane roundabout. Shawn and Danielle worked together on this
project.

City Council/RSA Agenda 114 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 9 ends

THE PROJECT TEAM
We have assembled a highly experienced team dedicated to successfully delivering the City’s project. Our organization chart depicts the lines of communication we intend to implement between project staff and the City. Shawn O’Keefe will serve as our project manager with Danielle Sanchez as deputy project manager. They will be the primary point of contact for the City and will be responsible for coordination between the City, our internal team and our subconsultants.

QA/QC
Mike Cooper, PE

PRINCIPAL IN CHARGE/

STRATEGIC ADVISOR
Sasha Dansky, PE, QSD
Marilou Ayupan, PE

PROJECT MANAGER
Shawn O’Keefe, PE, QSD

PROJECT STAFF
CIVIL
Bobby Lin, PE
Jerry Tran, PE
Binh Do
Aileen Jiang
SURVEY
Sherrie Zimmerman, PLS
Justin Height, PLS (Guida)

PUMP STATION
Robert Woodhouse, PE
Robert Stevens, PE, TE (CSW)

HAZARDOUS MATERIAL
Jeriann Alexander, PE, REPA (Fugro)

GEOTECHNICAL
David Wang, PhD, PE (Parikh)
Frank Wang, PE, GE (Parikh)
RAIL
Etty Mercurio, PE (AECOM)
Pat Somerville, PE

BRIDGE/STRUCTURES
Tom Barnard, PE (AECOM)
Marshall Moore, SE

CONSTRUCTABILITY
John Collins, PE
Frank Quach

STORMWATER/DRAINAGE
Analette Ochoa, PE, QSD (WRECO)
Raja Periketi, PE, QSD (WRECO)
Joe Streeper, PE,QSD

LANDSCAPE
Chris Kent, PLA (PGA)
Erik Smith, PLA

ENVIRONMENTAL/PERMITTING
Rich Walter (ICF)

UTILITY DESIGN AND COORDINATION
Robert Stevens, PE, TE (CSW)

RIGHT OF WAY
Steve Castellano (ARWS)

TRAFFIC SIGNAL AND LIGHTING
Dan Yau, PE, TE, PTOE (Y&C)
Kin Chan, PE (Y&C)

TRAFFIC ANALYSIS
Damian Stefanakis (Kittelson)

BICYCLE/PEDESTRIAN PEER DESIGN
REVIEW
Jeremy Chrzan, PE, PTOE, LEED AP (Toole)

PLANNING
Boris Dramov (ROMA)

DEPUTY PROJECT MANAGER
Danielle Sanchez, PE, QSD

CITY OF UNION CITY
James Logan High Alumni
Key Staff

THE MANAGEMENT TEAM
SHAWN O’KEEFE, PE, QSD
Project Manager
Shawn O’Keefe will lead the project team as project manager. He will leverage his experience with the Quarry Lakes Parkway project, local roadway and complete streets projects, his relationships with the City, Alameda CTC, Caltrans, and his experience managing teams to deliver this PS&E successfully. He has proven success managing and delivering projects from inception to completion. Shawn has demonstrated his commitment and availability to the project through helping the City re-envision the corridor, preliminary scoping, phasing, and implementation planning.

Shawn’s ability to plan, communicate with and manage internal and external team members has proven a significant asset to numerous clients. Shawn has a history of working closely with client project managers in a hands-on fashion to achieve project goals and keep projects on schedule. Shawn believes in communicating issues as they arise, particularly as they relate to scope, schedule and budget so there are no surprises.

Careful communication and planning avoids problematic scope creep and project design cost overruns. This approach and his understanding of client’s challenges in securing additional design funds, has allowed Shawn to consistently deliver projects from vision to completion.

DANIELLE SANCHEZ, PE, QSD
Deputy Project Manager
Partnering with Shawn as deputy project manager will be Danielle Sanchez. Danielle will track and communicate project goals and expectations clearly to the project design team and the City. Her organization and communication skills will allow her to manage deliverables and dynamic project schedules effectively.

Through her local ties to the community, being raised in Union City and graduated from James Logan High, Danielle understands the community’s needs and is passionate about the improvements that the Quarry Lakes Parkway project brings.

TAG TEAM PARTNERSHIP
Shawn and Danielle’s tag team management approach has been tried and tested through the different projects they successfully delivered, including SR 113/Hutchinson, UC Davis West Village Connectivity, and various requests in support of Bay Area design projects.

Together, they will ensure clear communications, quality deliverables, consistency and continuity from preliminary engineering through project completion.

City Council/RSA Agenda 115 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 10 ends

OUR TEAMING PARTNERS
In addition to our in-house staff, our teaming partners supplement and expand our capabilities and take advantage of their existing understanding and work history on the corridor. Our team includes AECOM, ICF, Fugro, Parikh, Kittelson, PGAdesign, AR/WS, and HDR|WRECO--firms with helpful backgrounds and experience with the EWC. We’ve added Toole Design Group, CSW|ST2, Y&C, Guida Surveying, and ROMA design to address QLP’s unique challenges. We have long standing working relationships with these firms and close working relationships with their proposed team members. Brief descriptions of key subconsultant’s capabilities are outlined below.

CSW - STUBER STROEH
ENGINEERING GROUP (CSW) | SLBE
Pump Station, Utility Design and
Coordination
» Solid history of successful collaborations with
developer City Ventures
» Extensive experience with every utility system
provider working in Union City
» Decades of experience developing and
implementing bike/ped improvements that meet
the requirements of funding sources including
OBAG and CNRA
ICF JONES AND STOKES (ICF) | LBE
Environmental
» Prior CEQA experience and permitting on EastWest Connector and Quarry Lakes Project » Previously developed permitting strategy,
mitigation plan, and consulted with regulatory
agencies for this project.
» Extensive experience with transportation project
environmental compliance in Alameda County and
California.
e
w
PGADESIGN | SLBE
Landscape Architect
» Over 40 years of experience providing landscape
architecture and urban planning services for public
and private projects, including transit corridors,
parks, and urban development
» Familiarity with project area through previous
experience working on the EWC project
e
w
HDR|WRECO | LBE
Stormwater/Drainage
» Unmatched familiarity and knowledge of project
issues through previous involvement with the
Quarry Lakes Parkway project and East-West
Connector project
» Knowledgeable in local watersheds, flood control,
and water quality design criteria
» Assisted the City with their Green Infrastructure
Plans
» Long term relationship with Union City, USACE,
Alameda County, Alameda CTC, ACFC & WD, and
San Francisco Bay RWQCB
e
w
FUGRO | LBE
Hazardous Materials
» Environmental professional staff have specific
knowledge of the project area and the
environmental issues present as we worked directly
on the predecessor transportation project, the
EWC, for more than 10 years.
» Specific awareness of the hydrogeologic
environment and the hazardous materials issues
within the planned transportation corridor.
e
w
e
w Previous involvement with EWC
AECOM | LBE
Rail
» Thorough understanding of the project challenges
and opportunies through prior evaluation of
construction methods and sequencing alternatives
for the BART/UPRR grade separation
» Long-standing, positive relationships with
BART, Capitol Corridor, and ACE and extensive
connections with UPRR Omaha and have in-house
staff that are former UPRR reviewers which will
be key when getting buy-in and maintaining the
schedule.
» Thorough understanding of future rail
improvements and how it affects this project
through experience being the prime consultant for
the California State Rail Plan
e
w
City Council/RSA Agenda 116 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 11 ends

ASSOCIATED RIGHT OF WAY
SERVICES (ARWS) | SLBE
Right of Way
» Over 30 years of experience providing right of way
services on transportation, transit, utility and other
public projects and programs
» Unmatched project knowledge through prior work
on the EWC project
» Extensive knowledge of Caltrans processes and
significant experience working on right of way
assignments for Alameda CTC.

PARIKH CONSULTANTS | SLBE
Geotechnical
» Unmatched familiarity with geotechnical conditions
in the region through previous work on the EWC
project
» Extensive experience providing geotechnical
services for similar projects
» Experienced with City’s and Alameda CTC’s
operating procedures and Caltrans requirements
and standards.

Y&C TRANSPORTATION | SLBE
Traffic Signal and Lighting
» Over 24 years of experience providing electrical
and traffic engineering services for more than 1000
transportation projects
» Extensive parkway/arterial improvement and
complete streets experience
» Experience with railroad underpass
GUIDA SURVEYING | SLBE
Survey
» Over 25 years of providing surveying services on
public and private projects
» Extensive experience on large transportation
corridor projects and Alameda CTC projects
» Utilizes cutting edge software technology and
equipment
ROMA DESIGN | SLBE
Planning
» Over 30 years of experience implementing
complex urban projects
» Extensive experience with the City -- completion
of the BART Union City Station and the UPRR rail
crossing, as well as other projects in the Station
District

TOOLE DESIGN GROUP (TDG)
Bicycle/Pedestrian Peer Review
» Specializes in bicycle and pedestrian design and
planning with a focus on developing functional
and accessible multimodal facilities
» Prepared the City’s Bicycle and Pedestrian Master
Plan update
» Previous work experience with the Quarry Lakes
Parkway project
e
w
e
w

KITTELSON
Traffic Analysis
» Conducted all traffic operations analysis for
the CEQA EIR phase of this project, as Dowling
Associates
» Conducted the traffic operations analysis for the
Supplemental EIR phase of this project
» Extensive experience in conducting transportation
safety analysis, multimodal planning, and travel
demand modeling, through projects such as the
Alameda County Systemic Safety Analysis Report,
the Alameda CTC East 14th Street/Mission Blvd and
Fremont Blvd. Multimodal Corridor Project, and
the Alameda CTC Countywide Model.
e
w

LBE AND SLBE PARTICIPATION
Mark Thomas meets the Local Business
Enterprise (LBE) and Small Local Business
Enterprise (SLBE) goals set forth by the
Alameda CTC LBCE program.

Details of our LBE and SLBE %
participation are available in Form 3 LBCE
Program Participation Summary
City Council/RSA Agenda 117 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 12 ends

SHAWN O’KEEFE, PE, QSD

PROJECT MANAGER

EDUCATION
BS in Civil Engineering

REGISTRATION
CA C71792
QSD 25799
Shawn has nearly 20 years of transportation experience, focused on delivering a wide variety of projects, including roadway projects, bike and pedestrian improvements, trails, local roadways, freeway interchanges and managed lanes, utility relocations, residential subdivisions, and industrial and commercial developments.

REPRESENTATIVE PROJECTS

QUARRY LAKES PARKWAY, UNION CITY
Project manager responsible for conceptual project
exhibit, Caltrans parcels conceptual site plan,
conceptual development map, and additional asneeded support for the conceptual review phase of the Quarry Lakes Parkway.

CHARLESTON CORRIDOR PHASE 2 AND 3, MOUNTAIN
VIEW
Project manager and principal in charge responsible
for leading the team in developing the project
concept, obtaining environmental clearance, and
preparing final documents for the Charleston Corridor
Improvements, Phases 2 and 3.

CHARLESTON-ARASTRADERO CORRIDOR, PALO ALTO
Project manager responsible for preparing complete
street roadway improvement plans along the corridor.

The project added innovative bicycle transportation
solutions which consist of modified signals, green
bike lanes, cycle tracks and Copenhagen bike left turn
lanes.

DECOTO ROAD CORRIDOR IMPROVEMENTS,

FREMONT
Project manager responsible for the multimodal
corridor concept plan from Mission Blvd to I-880
and final design for Paseo Padre Parkway to I-880,
and preparation of PSR/PDS for the I-880/Decoto
Road interchange. This involves extensive stakeholder
coordination.

SOQUEL DRIVE BUFFERED BIKE LANE AND

CONGESTION MITIGATION PLAN
Project manager responsible for the preliminary
engineering and final design for this multifaceted fivemile Complete Streets project with buffered bike lanes and congestion mitigation features.

UC DAVIS WEST VILLAGE CONNECTIVITY, DAVIS
Project manager responsible for the preparation
preliminary and final design documents for several
critical transportation improvement projects in the
West Village area of the UC Davis campus.

BART STATION IMPROVEMENTS, EL CERRITO AND

WEST DUBLIN
Civil project manager for El Cerrito Del Norte
BART Station Modernization and the West DublinPleasanton BART Station Improvements. The El Cerrito Del Norte Station involved the preliminary and final
design for the concourse, bus stops and platforms,
landscape and irrigation, pedestrian promenade, and
parking lot redesign. West Dublin-Pleasanton Station
involved adding gateway treatments to the northern
component of the station including pedestrian plaza
with decorative concrete and site furnishings, widened
sidewalk and plantings, a taxi waiting area, ornamental fencing, and wayfinding signage.

City Council/RSA Agenda 118 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 13 ends

DANIELLE SANCHEZ, PE, QSD

DEPUTY PROJECT MANAGER

EDUCATION
BS in Civil Engineering

REGISTRATION
CA C86385
Danielle has 12 years of engineering experience. Her experience include municipal, educational, commercial and residential projects, storm water treatment designs, roadways, and ADA facilities. Danielle supports clients by integrating and executing their vision throughout the complexities of planning/feasibility, permitting/ entitlements, and implementation/construction.

REPRESENTATIVE PROJECTS
SR 113/HUTCHINSON INTERCHANGE IMPROVEMENTS,
DAVIDS
Deputy project manager responsible for preparing
preliminary and final design services for the Highway
113 and Hutchison Drive Interchange project.

The project stretches from the Hutchison Drive
roundabout to Health Science Drive on the UC Davis
campus. Improvements include ramp modifications,
intersection signalization, roadway modifications,
pedestrian and bicycle improvements, lighting,
landscape and irrigation and signing and striping.

Project and environmental approval through Caltrans
will be gained through the PEER approval process and
will move in parallel with the final design PS&E.

UC DAVIS WEST VILLAGE CONNECTIVITY, DAVIS
Deputy project manager responsible for the
preparation preliminary and final design documents
for several critical transportation improvement projects in the West Village area of the UC Davis campus.

PACIFIC RIDGE, HALF MOON BAY
Senior design engineer and project manager
responsible for designing roadway alignments, trails,
sidewalk, cross sections, utilities, ADA compliant curb ramps, and profiles within the project limits. The
project includes 63 residential homes, a bridge, a
super-span system, steam corridors, retaining walls,
environmentally sensitive habitat area setbacks,
hydrologic and hydraulic analyses report, and
coordination with and approval from different
agencies.

SLATTEN RANCH ROAD, ANTIOCH
Design engineer responsible for supporting the City of
Antioch in the formation of the East Lone Tree Specific Plan Phase II Benefit District through preliminary
plan line design and development of the Engineering
Report for the 2.4-mile extension of Slatten Ranch
Road. The project included roadway alignments,
roadway profiles, roadway geometry, road cross
sections, storm water treatment facilities, and utilities.

SOUTH CAMINO PABLO ANNEXATION PROJECT,
MORAGA
Senior design engineer and project manager
responsible for the preliminary geometry (including
roadway, sidewalk, bike route, and intersection),
preliminary utility design (including storm drain,
bio-retention and hydromodification management
facilities, water main, and sanitary sewer systems), and cross sections while being sensitive to the jurisdictional areas and existing topography resulting in minimal
impacts to the environment while maintaining existing
view sheds. The project will widen a portion of Camino
Pablo to a collector road with a bike route and an 8’
sidewalk to maintain access to a park.

City Council/RSA Agenda 119 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 14 ends

ETTY MERCURIO, PE | RAIL

REPRESENTATIVE PROJECTS

EAST WEST CONNECTOR PROJECT,

UNION CITY AND FREMONT
Project manager responsible for the
BART and UPRR grade separations.

Etty led the design and evaluation
of construction methods and
sequencing alternatives for the
BART/UPRR grade separation and a
UPRR grade separation
ROUTE 238 MISSION BOULEVARD

SPOT IMPROVEMENT, HAYWARD,

UNION CITY, AND FREMONT
Project manager from preliminary
engineering through final design
and construction. Coordinated
right-of-way and funding
agreements, CPUC applications,
UPRR agreements, hydraulic reports,
permits, and public outreach.

PASEO PADRE PARKWAY GRADE

SEPARATION, FREMONT
Project manager for preliminary
engineering through final design
for this project. 1.5 miles of new
UPRR 1.5 track, an overhead grade
separation at Washington Boulevard,
a future roadway, an underpass
grade separation at Paseo Padre
Parkway with an underpass structure
for UPRR, an aerial structure for
BART WSX tracks, and a utility
bridge.

EDUCATION BS in Civil Engineering | REGISTRATION CA C73128, QSD 01309 » Led the design and evaluation of construction methods and sequencing alternatives for the BART/UPRR grade separation and a UPRR grade separation for the East West Connector Project » Successful record coordinating with UPRR on more than a dozen projects. » Thorough understanding of BART’s processes, expectations, and requirements having served as program manager for four BART on-call GEC contracts.

ANALETTE OCHOA, PE, QSD | DRAINAGE

REPRESENTATIVE PROJECTS

EWC PROJECT, UNION CITY AND

FREMONT
Project manager responsible for
the Water Quality Study Report,
Location Hydraulic Study Report,
Hydrology and Hydraulic Study
Report, and Stormwater Data
Report during the PA&ED phase.

She further worked toward the PS&E
phase, including drainage design,
LID stormwater treatment, utility
relocation, and hydromodification
mitigation.

UNION CITY GREEN

INFRASTRUCTURE PLAN,UNION CITY
Project manager, responsible
for assisting the City with the
development of the Green
Infrastructure Plan. The purpose
of the Green Infrastructure Plan
is to guide the identification,
implementation, tracking, and
reporting of green infrastructure
projects within Union City, in
accordance with the Municipal
Regional Stormwater Permit.

H STREET GREEN STREET

IMPROVEMENTS PROJECT, UNION
CITY
Project manager, managed the
design of LID green infrastructure
elements that mimic natural
systems processes to stimulate predevelopment hydrology that will reduce the amount of contaminated
stormwater flows that reach
Alameda Creek.

EDUCATION BS in Civil Engineering | REGISTRATION CA C55279, CA QSD 178 » Over 27 years of experience in stormwater management, green infrastructure, drainage design, and hydraulics
» Well-versed in the stormwater requirements specific to the Bay Area » Assisted Caltrans Headquarters in updating stormwater-related manuals and templates, as well as training local agencies and Caltrans’ staff on low-impact development (LID) design requirements and hydromodification mitigation design.

City Council/RSA Agenda 120 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 15 ends

RICHARD WALTER | ENVIRONMENTAL

REPRESENTATIVE PROJECTS

EAST WEST CONNECTOR PROJECT,

UNION CITY AND FREMONT
Project director for the
environmental scope of work. Led
the preparation of the EIR for the
EWC as well as the regulatory
permitting support. Assisted with
determining the potential need for
subsequent environmental review
and permitting strategy.

SR 239, BRENTWOOD TO TRACY
Project director for environmental
compliance for new highway
between SR4 in Brentwood to I-580
near Tracy. Led team that conducted
preliminary biological and cultural
resource evaluations to support
screening of alternatives under
consideration in 2013 and 2015.

Leading the development of EIR/EIS.

SR 238 CORRIDOR, HAYWARD
Project director for preparation of an
EIR for improvements to circulation
along Foothill and Mission
Boulevards and the downtown area.

EDUCATION BA in History, MA in International Relations/Energy, Environment, Science, and Technology » Over 29 years of experience in environmental planning, compliance strategy, permitting, and mitigation development and implementation
» Project Director to prior environmental compliance and regulatory permitting work on EWC/Quarry Lakes Project
» Extensive experience working with the City of Union City CHRIS KENT, PLA | LANDSCAPE ARCHITECT

REPRESENTATIVE PROJECTS

EAST WEST CONNECTOR PROJECT,

UNION CITY AND FREMONT
Project manager responsible for
designing a 2.5-mile roadway
through the cities of Fremont and
Union City. The design necessitated
three bridge crossings as the
roadway crosses over Old Alameda
Creek at three locations and an
Alameda flood control channel.
7TH STREET REVITALIZATION,

OAKLAND
Principal-in-charge and project
nanager for planning and
documenting six blocks of
streetscape/transit improvements
at the West Oakland BART station.

This $4 million project improved
the pedestrian experience, making
public transit more convenient, safe,
and enjoyable.

HESPERIAN BOULEVARD, SAN

LORENZO
Project manager for the Hesperian
Boulevard Corridor Improvement
Project, a complete street project
in San Lorenzo along a mile of a
busy commercial retail strip with
few existing pedestrian amenities.

PGAdesign was the landscape
architect of record for the project.

EDUCATION Master of Landscape Architecture | REGISTRATION CA LA4289, CLARB 36090 » Over 20 years of experience integrating complex programming on sites with both multi-agency and community stakeholders
» Extensive experience on similar corridor projects
» Previous experience on the EWC project
City Council/RSA Agenda 121 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 16 ends

T EC H N I C A L

APPROACH

PROJECT BACKGROUND/UNDERSTANDING
Originally known as the I-880 to Mission Boulevard East-West Connector (EWC), Quarry Lakes Parkway (QLP) reflects the revised, community-oriented, multi-modal, approach to the new local roadway and redefines it as a gateway to Quarry Lakes Regional Park. QLP will connect the neighbors, parks, schools and jobs in Fremont and Union City and support the development of the Station District around the Union City BART and ACE Stations. QLP will carry local buses, deliveries, emergency vehicles, cars, bicycles, and pedestrian trips in and out of the new community of homes and offices. This project is the major first link providing better circulation within the community for vehicles and will offer a non-motorized, healthy travel alternative to access transit, local parks, trails, and retail. In time, the larger project will allow safer routes to schools, and playgrounds.

The current phasing for the project proposes to complete Phases 1 and 2 (the “bookends”) first, to straighten the connection from Mission Boulevard to 7th Street and allow for City Corporation Yard improvements and construct a new roadway segment from Old Alameda Creek to Alvarado-Niles Road allowing for development of the Gateway Site and the extension of needed utilities. Phases 3 and 4 will close the gap between Phase 1 and 2 with grade separations at the Union Pacific Railroad (UPRR) and BART tracks while Phase 5 will complete the project by connecting Phase 2 with Paseo Padre Parkway in Fremont.
1986
Alameda CTC
initiated the
I-880 to Mission
Boulevard East
West Connector
(EWC) project
under Measure B
2014
Alameda County
Measure BB
funded ROW
documentation,
UPRR and BART
grade separation
designs, and
environmental
mitigation
2011
EWC cost totaled $300
Million, design halted due to
insufficient funding
The project was unpopular
to City residents due to high
cost, highway like elements,
and lack of coordination with
local projects
2018
Union City gained
approval from Alameda
CTC to implement the
re-envisioned QLP
project

FROM EWC TO QLP
Project Goals
Encourage walking and
biking
Support first/last mile
access to transit
Enhance transit
reliability and service
Enhance circulation
to support a vibrant
Station District
Improve connectivity
to regional
destinations and trails
City Council/RSA Agenda 122 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 17 ends

PROJECT OVERVIEW
This stage of the project is to develop the 30% design for Phases 1, 2, 3 and 4 and document the basis of design in a Preliminary Design Report (PDR). The PDR will document design criteria, design issues and refinements, site issues and limitations, permitting strategy, project risks, procedural requirements, cost analysis and construction schedule. We understand the importance of combining all four phases at this early stage toward developing a cohesive, multimodal complete streets facility that respects the City’s vision and realizes the promise of a healthy, vibrant community.

PHASES 1 AND 2
Phases 1 and 2 involve design of new roadway
comprising QLP, including 2 lanes in each direction
for vehicles, buffered bike lanes, sidewalks in each
direction, drainage facilities, and all utilities needed to support development. The two Phases “bookend”
Phases 3 & 4. As with all Phases of this project,
amenities for bicycle and pedestrian mobility and
safety, stormwater sustainability, landscape, and urban design concepts will be applied to the roadways and
intersections. Stormwater and drainage will be studied
and conceptualized for all four phases such that
the system works together in the most effective and
sustainable manner.

PHASES 3 AND 4
Phases 3 and 4 depress a roadway to create a to
grade separation under BART and UPRR Oakland and
Niles Subdivisions. As such, they are more complex
segments with major structural considerations, rail
accommodations, agency coordination, operations,
and groundwater and drainage considerations.

Although structural elements are not part of this
phase of work, agency coordination, groundwater and
drainage requirements will be considered as part of
the conceptual design of the entire project, along with roadway and related elements, to result in an efficient coordinated facility.

TECHNICAL APPROACH
The Mark Thomas Team has an unparalleled understanding of the project and its challenges while also bringing a fresh approach to design elements and project delivery. Our team has been assembled using many of the original EWC technical experts to take advantage of prior project investments and limit the amount of time it will take to “get up to speed” on this complex, multi-phased project. New team members include Toole Design Group (Toole), CSW|ST2, and Boris Dramov of ROMA Design (ROMA). Toole will assist with geometric reviews and graphics. CSW|ST2 will assist with utility coordination, utility design, and serve as a developer interface.

As an optional service, ROMA can assist with high level planning, preliminary design opportunities, and maintaining cohesion with the existing Station Area Development.

Mark Thomas’ experience with this project’s connections extends beyond Union City as we are currently completing the final design (now at 100%) for the Decoto Road Complete Streets project for the City of Fremont. Both projects rely on the same 2009 EWC EIR as the CEQA clearance document.

PRELIMINARY DESIGN REPORT
At the outset of the project, the Mark Thomas Team will build upon the Preliminary Design Report (PDR) we have prepared as a part of this proposal to identify project risks, actions to mitigate those risks and document design decisions to develop the basis of design for the 30% plans. During PDR development we will evaluate and explore feasible alternatives for items such as stormwater management and treatment, resource agency permitting, geometric design, and hazardous materials, just to name a few. We have completed numerous PDRs for past projects including the Kirker Pass Truck Climbing Lanes project for Contra Costa County and the Mokelumne Pedestrian Overcrossing project for CCTA. The PDR will be a critical tool for QLP to document decisions and provide the design intent as this is a long-term multi-phase project.

City Council/RSA Agenda 123 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 18 ends

PLANNING SYNTHESIS
The City has a big-picture vision for the project. When embarking on a multi-year, multi-phased project, it’s important to review previous planning documents to be sure to convey the City’s vision and capture local community needs in the design. ROMA brings experience, knowledge, and a unique approach to support the preliminary design process. ROMA can help orchestrate the team’s efforts to integrate the vision for QLP into the design. The preliminary design will be a collaborative process between ROMA and the design team in which issues are identified, solutions proposed, and sketches developed for design variations, options or alternatives.

Each iteration of this process effectively allows for input from the City, other agencies, and stakeholders. Some initial areas for exploration include:
» Determine if minor alignment adjustments within the project footprint may better respond to existing and future neighborhoods and open spaces
» Revisit the cross-section of the parkway for an opportunity to provide for significant landscaping to create a linear landscape corridor that connects open space and recreational facilities » Explore adjustments to the stormwater detention areas to remove barriers to adjacent development and improve open space and recreational opportunities
» Suggest topographic or landscape modifications along the right of way to create a better relationship to existing and future uses
» Address the potential for increased flooding hazards caused by climate change » Refine the construction and phasing strategy to facilitate implementation Involving ROMA in the conceptual design process will enhance QLP’s form and function.

GEOMETRIC REFINEMENTS
Mark Thomas, the City, and Fremont have collaborated over the past several years to review and provide options for updated/enhanced roadway geometrics to the 2011 EWC design. In that time complete streets guidelines and best practices for bicycle and pedestrian facilities have evolved. Moving forward, QLP will need to reflect a local, multimodal approach to accommodate the safety and circulation needs of all forms of transportation.

We have identified geometric refinements that can be made to both the cross section and intersection designs to provide protected intersection elements for bicyclists and shorten crossing distances for pedestrians. We will also explore lane assignments/space allocation at the intersections to eliminate dual left turn lanes where possible. Team member Kittelson & Associates, Inc. (Kittelson) has past EWC traffic experience and helped with the revised traffic memo for QLP. Kittelson will verify that proposed changes in the geometrics will not negatively impact traffic operations to a significant level. We expect to refine the design for bus transit, specifically high functioning and efficient stops, using the latest AC Transit Bus Policy and Multimodal Corridor Guidelines as well as input from Union City Transit.

Mark Thomas has been
working closely with Toole
Design Group to update
the Union City Bicycle
and Pedestrian Master
Plan. Toole has been on
the forefront of forwardthinking bicycle and
pedestrian design, so we
have added them to our
team to supplement our
already strong complete
streets designers.

The exhibit on the next page shows our
proposed improvements to the QLP project
City Council/RSA Agenda 124 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 19 ends

DRY
40+00
45+00
50+00
55+00
60+00
65+00
70+00
75+00
80+00
85+00
90+00
BART

OAKLAND SUBDIVISION

ALVARADO NILES RD

OSPREY DR

NILES SUBDIVISION

MISSION BLVD
DRIGON

DOG PARK

UNION CITY

CORP YARD
(QUARRY LAKES DR)

RE-ALIG

NED QUARRY LA
KES D
R
30 40
50 60
70 80
90 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 40+00 45+00 50+00 55+00 60+00 65+00 70+00 75+00 80+00 85+00 90+00 +00.00 PVI Elev 45.76 48+31.47 BVC Elev 47.37 48+31.47 EVC Elev 47.37 200' VC
K=281.69'
High Pt Sta = 49+15.98
High Pt Elev = 47.50
53+40.00 BVC
Elev 48.66
53+40.00 EVC
Elev 48.66
180' VC
K=35.30'
High Pt Sta = 53+88.88
High Pt Elev = 49.00
50+89.13 BVC
Elev 47.03
50+89.13 EVC
Elev 47.03
200' VC
K=114.94' Low Pt Elev = 46.94
Low Pt Sta = 51+35.11
73+20.00 BVC
Elev 41.69
73+20.00 EVC
Elev 41.69
410' VC
K=99.59'
High Pt Sta = 77+30.00
High Pt Elev = 52.07
56+42.00 BVC
Elev 39.10
56+42.00 EVC
Elev 39.10
450' VC
K=60.96' Low Pt Elev = 24.15
Low Pt Sta = 60+68.97
68+49.50 BVC
Elev 27.03
68+49.50 EVC
Elev 27.03
330' VC
K=78.23'
Low Pt Elev = 27.03
Low Pt Sta = 68+49.50
+65.00 PVIElev 52.24
+85.00 PVIElev 51.77
+40.00 PVIElev 53.78
81+70.00 BVC
Elev 50.11
81+70.00 EVC
Elev 50.11
200' VC
K=166.67' Low Pt Elev = 49.44
Low Pt Sta = 83+20.00
84+30.00 BVC
Elev 49.69
84+30.00 EVC
Elev 49.69
200' VC
K=133.33'
Low Pt Elev = 49.69
Low Pt Sta = 84+30.00

PROFILE
PHASE 1
PHASE 3 PHASE 4
PHASE 2
PHASE 5
1 Large open area potentially can be used as green
space / stormwater treatment ares.
2 New 11th Street roadway will provide easy access to
BART station along Quarry Lakes Parkway
3 Existing rail lines and Green Street roadway will
require grade separated structures. New structures
will provide opportunity for modernized structures
with aesthetic enhancements.
4 Realignment of 7th Street allows for a formalized
intersection with improved access for Residents
into Chesapeake Drive
5 Realignment of 7th Street opens space to provide
additional parking for the UC Corp Yard and
Drigon Dog Park.
6 Existing rail lines will require grade separated
structures. New structures will provide opportunity
for modernized structures with aesthetic
enhancements.
7 Reconstructed access into Osprey Drive allows for
reuse of space for aesthetic improvements
8 Existing low grade water detention area will need
mitigation strategy. Potential area for pump station
to move water into treatment areas.
9 Width of new Quarry Lakes Parkway roadway
allows for a standard multi-modal cross section
friendly to bikes, peds, and vehicles.
10 Connection with a major arterial (ANR) will improve
overall traffic throughout these corridors.
11 Upgrade of drainage channel will improve the
performance of existing drainage
12 Potential space to construct new outfall area to
move flow into Old Alameda Creek
13 Connection with a major arterial (Mission Blvd)) will improve overall traffic throughout these corridors
and new access for residents into Appian Way
14 Realignment of Quarry Lakes Drive allows for
future developments in the Caltrans Parcel
15 New grade separations will need to balance the
vertical profile between the new railroad structures
and the Newark Aquifer
1 2
3 4 5
6 7 8 9
10 11
12 13
14 15
City Council/RSA Agenda 125 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 20 ends

ENVIRONMENTAL DOCUMENT
Mark Thomas team member ICF previously developed and cleared the EWC project through CEQA in 2009, with an EIR which will continue to be the supporting document for the final design phases of the project. While the final design will identify possible refinements and enhancements, the footprint and purpose and need of the project will need to stay within the parameters of the existing EIR. That said, minor changes are inevitable due to evolving design standards. A simple CEQA Addendum can be prepared to address these revised project elements should the City decide to do so. An addendum does not require public circulation and can be used when the project design and footprint do not result in any new or substantially more severe environmental impacts. The need for a NEPA document is not anticipated at this time as no federal funds are involved and NEPA compliance is presumed to be done internally by the U.S. Army Corps of Engineers (USACE) during the permitting phase. Permitting requirements identification and the Environmental Monitoring & Reporting Program (MMRP) will build on the prior permitting strategy and MMRP developed for the EWC.

LANDSCAPE ARCHITECTURE
Mark Thomas team member PGAdesign previously worked on the EWC project and thoroughly understands the City’s goals for QLP. One of PGAdesign’s main roles is to merge the project’s function with its aesthetic, an ambition reflected by the City’s goal “to promote safe, efficient, and convenient multimodal travel while also supporting public life, neighborhoods, and economic vitality.” Making a facility safe, efficient, and convenient will not necessarily support and encourage public life; it is the public life that will ultimately encourage neighborhood livability and economic vitality. PGAdesign will coordinate closely with the entire team to successfully integrate the interests and demands of stakeholders, agencies, design standards, utilities, cost, and maintenance encountered during design. Upon completion, the parkway should look unified and intentional.

Street trees will be selected that provide the desired shade, adapt to potential climate change over the next 50 years, require minimal maintenance and water use, and minimize vector control while providing habitat.

They will be placed to provide needed shade but allow for street light penetration and appropriate setbacks for utilities, lighting, driveway cuts, and signage. Landscaping will unite the varied segments of the parkway through a cohesive planting plan, while understanding the microclimate to ensure healthy robust plants that will survive and flourish in a “people place.” Plantings can be used adjacent to existing residential buildings to provide privacy/sound walls and to reduce the visual impact of the new pavement needed for QLP. Planting will be scaled for vehicles, cyclists, and pedestrians. Uncomplicated plant masses relate to the natural open spaces and are easier and less expensive to maintain. The design will employ cost effective and appropriate water conservation strategies and planting will be water efficient. An example concept of possible planting and amenities for Phase 1 is shown below.

PHASE 1
City Council/RSA Agenda 126 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 21 ends

Safety will be considered as plantings can provide safety benefits, such as providing headlight glare reduction and windbreaks. Design elements will aim to reduce exposure to traffic for maintenance workers by using paver bands in medians, and paving narrow, high-risk areas. Finally, landscape maintenance will be considered by using established methods to reduce long-term maintenance (i.e., Bay Friendly Practices, life-cycle cost, plant succession, robust planting details). The team will also collaborate with City field crews to gather input that will inform design decisions.

ADJACENT DEVELOPMENT AND UTILITY EXTENSIONS
As defined in the Station District Specific Plan, the Gateway subarea will offer a mix of affordable and market rate multi-family housing and accommodate Phase 2 of QLP. The 25-acre agricultural parcel located to the west of Alvarado-Niles Road was formally owned by the State of California and has been transferred to the City, which is currently partnering with City Ventures on the development. Mark Thomas team member CSW|ST2 has direct experience working with City Ventures, in addition to completing the design and permitting of multi-family developments across the northern California.

As QLP Phase 2 will likely be ahead of the adjacent development, CSW|ST2 will work closely with the City and City Ventures to understand and size future utility lines, such as potable water served by Alameda County Water District (connecting to the existing 24-inch diameter main in Alvarado Niles Road), sanitary sewer provided by the Union Sanitary District (connecting to the existing 27-inch diameter main in Alvarado Niles Road), electrical and communications systems provided by Pacific Gas and Electric (PG&E), Comcast, AT&T, as well as potential new entrants into the marketplace such as Wave and Sonic. For the electrical and communications infrastructure, our team will notify public utilities of the opportunity to install their infrastructure in a joint trench.

We will need to coordinate this effort with the developer as PG&E is prohibited by the California Public Utilities Commission (CPUC) to design or install infrastructure along a new roadway until they receive an application for service. We have supported agencies in developing reimbursement agreements for their pro-rata share of utility infrastructure installed in the project, as the utility systems often need to be installed before the developer is ready to commence construction.

STORMWATER MANAGEMENT
Mark Thomas team member HDR|WRECO was an integral part of the former EWC project and has an unparalleled understanding of the project and the local watershed, flood control and water quality design criteria. Their previous coordination with stakeholders such as the Alameda County Flood Control and Water District (ACFC&WD) and the RWQCB led to preliminary agreement on potential off-site stormwater treatment alternative compliance to address stormwater treatment goals. HDR|WRECO assisted the City with their Green Infrastructure plans and is familiar with the methods for alternative compliance should right of way for complete stormwater treatment become a concern.

Drainage Design
Phases 1-4, except for the connection to Mission Boulevard (SR-238), are generally within the City limits hence improvements will follow City standards. The Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRM, 06001C0433G) identifies that the Project is within Zone X (above the base flood) and Zone AH (shallow flooding). The flooding along the Line M Channel is likely caused by the existing undersized channel and the two 90-degree bends near the City’s Corporation Yard. QLP also lies within the Alameda Creek watershed and the runoff from the roadway will be collected through the City’s storm drain systems.

Phase 1 crosses a section of the Line M Channel and a Reinforced Box Culvert (RCB) will be proposed to address the Line M channel crossing under QLP. In an effort to resolve the existing flooding issues in the Line M channel, a diversion pipe will be proposed to bypass some of the flow from the Line M Channel and discharge into Old Alameda Creek. Phase 3 will remove an existing detention basin (called “New Basin”) and to mitigate this impact, a new detention system will be proposed on the west side of the BART tracks. Previously, the plan was to use open air detention/infiltration basins with steep slopes to provide the necessary stormwater storage.

City Council/RSA Agenda 127 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 22 ends

During review of the previous design, we explored options to take back this lost acreage and propose to use underground storage methods with either plastic, metal, or concrete pipes. This underground system, while more costly will provide an opportunity to create a new public space, such as soccer fields, to help support the adjacent communities and the new proposed development site on the former Caltrans parcels.

Stormwater Treatment
The Project will add a significant amount of new impervious area and the design will rely on the Alameda Countywide Clean Water Program’s (ACCWP) C.3 Stormwater Technical Guidance Handbook. To address the stormwater treatment requirements HDR|WRECO will look for innovative solutions to reduce the right of way required for the outdated infiltration basin concept. If the Project is unable to provide enough treatment within the Project footprint, the design team will look for off-site treatment opportunities. The project will also be required to implement postconstruction stormwater controls per the Municipal Regional Stormwater National Pollutant Discharge Elimination System (NPDES) Permit (MRP, Order R2-2015-0049). Likely stormwater treatment measures include bioretention areas (swales), flow-through planter boxes, tree well filters, pervious paving, and permeable joint pavers.

Hydromodification
HDR|WRECO will look at innovative ideas to address the hydromodification requirements of the Project. Projects that create or replace 1 acre or more of impervious and are in areas susceptible to hydromodification impacts should include hydromodification mitigation measures. The ACCWP’s Hydromodification Susceptibility Map Application has determined the Project is within a white area that drains to an earthen channel.

Therefore, the Project is required to consider hydromodification impacts or propose hydromodification management measures. Bioretention areas, underground treatment areas proposed for stormwater treatment will provide hydromodification management. This will be documented in the Stormwater Management Plan.

SUBSURFACE CONDITIONS
Geotechnical
Mark Thomas Team member Parikh Consultants prepared geotechnical reports for the EWC project and will build upon the existing documentation to meet current standards and identify newer technologies in earth retaining structures that may be a better fit for the project design. In general, we expect the native soil to be generally stiff to very stiff clays through about elevation 10 overlying sand and gravel deposits with the existing alignment grade at around elevation 49. Groundwater levels should be between elevation 29 and 24 per USGS geologic data and recent ACWD monitoring well data. The previous design assumed groundwater at elevation 30 but site-specific soil borings are recommended to verify current groundwater levels as they have likely changed over the last decade.

HDR|WRECO developed
the City’s Green
Infrastructure Plans and
understands stormwater
treatment can be
considered off-site in
the same watershed
which may have more
available right of way and
have more critical water
quality goals such as
industrial areas.

The Stormwater
Management Plan
for the Project will
characterize the water
resources (e.g., surface
water, stormwater, and
groundwater) within the
project area, assess the
potential environmental
consequences to these
water resources from the
new roadway, and discuss
measures designed to
avoid or minimize these
impacts. A discussion of
the measures to comply
with the CGP, including a
risk level determination
and a description of the
BMPs proposed for the
project, will be included
in the plan.

City Council/RSA Agenda 128 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 23 ends

The previous retaining wall design at the Phase 3 and 4 grade separations called for Cement Deep Soil Mixing (CDSM) walls for groundwater control and bottom stabilization to account for buoyancy as the lowest portion of the profile was close to the clay and gravel boundary. We will evaluate wall type options as a part of the PDR process. Another unique feature within Phase 3 is the existing at-grade Green Street bridge that was constructed in anticipation of the QLP project many years ago. Due to changes in seismic and structural standards it would be prudent to evaluate the bridge in accordance with current criteria to understand if retrofitting the existing structure is required.

Newark Aquifer
The Newark Aquifer constitutes a major drinking water source for residents of Fremont, Newark, and Union City and as a result, the ACWD requires roadway vertical profile minimums to preserve the boundary between the Newark Aquifer and the Newark Aquiclude. The ACWD stipulated a minimum of 5-feet of Newark Aquiclude material remain undisturbed above the aquifer boundary.

Hazardous Materials
Mark Thomas Team member Fugro conducted a Phase I Environmental Site Assessment (ESA) in 2008 for the EWC project and identified a number of historic uses in the vicinity of the Quarry Lakes Parkway project, many of which likely resulted or have resulted in remnant impacts to soil and groundwater within the proposed construction corridor. Historic uses in the project vicinity included agricultural crops, rural farms/ranches, steel manufacturing at the Pacific States Steel Corporation (PSSC) property, Union City Corporation Yard, and rural transportation and rail corridors.

Significant remediation was conducted under oversight of the Department of Toxics Substance Control (DTSC) and the Regional Water Quality Control Board (RWQCB) at the former PSSC property.

Various phases of soil and groundwater testing were conducted by Fugro from 2010 to 2016 which confirmed that soil and groundwater present within the Quarry Lakes Parkway project limits will require special attention and handling during construction. The existing chemical data from these studies and remediation activities coupled with the data collected during the various Phase II ESA’s represent sufficient data for the development of a Hazardous Materials Report for the areas within Phases 1-4 of QLP.

RESOURCE AGENCY PERMITTING
Mark Thomas Team member ICF previously developed the permitting strategy for the EWC project including the permits required, the mitigation required, and the options for either obtaining mitigation credits or implementing mitigation on-site or off-site, including options for partnering with other agencies. For QLP, ICF will update and revise the prior permitting strategy and take into account the current phasing plan, current resource agency requirements (USACE, USFWS, NMFS, CDFW, RWQCB) and an updated understanding of mitigation options available for the project. As off-site mitigation bank options are extremely limited, we will explore potential partnerships with other agencies such as the East Bay Regional Park District (EBRPD), Zone 7 Water Agency and the USFWS relating to the South Bay Salt Pond project.

Phase 1 of the project will require permits for realignment of the Line M channel and potentially for filling a portion of Basin 2C. Basin 2C is a mitigation wetland created as a part of the adjacent residential development.

The RWQCB has previously indicated that it is reluctant to permit filling in of a prior mitigation site and will mandate a high ratio as part of permitting (previously they have cited a 10:1 ratio). Phase 1 will require permits from USACE, CDFW, and RWQCB as well as consultation with USFWS regarding potential habitat for listed The Hazardous Materials
Report will inform the
design team regarding
the areas of potentially
hazardous materials/
wastes, the regulatory
interaction which is
required with the DTSC,
and the interaction with
Alameda County Water
District (ACWD) and
the RWQCB regarding
construction practices in
proximity to the top of
the Newark Aquifer.

City Council/RSA Agenda 129 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 24 ends

federal species. Phase 2 of the project does not cross any waters or wetlands but may affect areas considered upland habitat for listed federal or state species within proximity to Old Alameda Creek. In addition, if any stormwater infrastructure requires encroachment into jurisdictional areas of Old Alameda Creek, that project element could trigger permitting from USACE, CDFW and/or RWQCB.

While not a part of the current project scope, it is important to understand the overall permitting requirements for all phases when developing our implementation strategy. Phase 3 will affect the remainder of Basin 2C, Line M and the “New Basin” while Phase 4 will affect Old Alameda Creek and the Alameda Creek Flood Channel along with adjacent riparian and upland habitat. A key consideration of the permitting strategy will be whether to seek permits for the different phases of the project or to permit Phases 1 through 4 at the same time. It is probable that the resource agencies may require combining some or all phases in the permitting in order to assess the “whole of the project.” For example, the agencies are likely to demand that the effects of Basic 2C and Line M not be split into two permits. There are efficiency gains to be had by permitting Phases 1 through 4 at the same time in terms of a singular permitting process with each agency and combining mitigation requirements. If permitting is ultimately pursued for all phases, a phased approach to mitigation should be pursued so that mitigation is only purchased implemented in phase with impacts, in order to avoid inordinate mitigation costs for the initial phases.

Caltrans Encroachment Permit
The majority of QLP is within City jurisdiction except on the far east end where it ties into Mission Boulevard (SR-238) which is within Caltrans right of way. These improvements will be subject to a Caltrans encroachment permit which will require following Caltrans standards and either a new or amended maintenance agreement with the State. Mark Thomas has numerous examples of successfully obtaining Caltrans encroachment permits for local agency projects and will help the City navigate the process smoothly and efficiently as to not hold up bidding or construction. Recent examples include encroachment permits for the Charleston Arastradero Corridor project in Palo Alto (under construction) and the Stoneridge Drive Improvement project in Pleasanton (in bid phase).

MANAGEMENT APPROACH
In addition to a sound technical approach, we have found the cornerstone of successful project delivery is for Mark Thomas and our team members to operate as a true extension of the City’s staff. We have developed a proven and effective management approach that will be utilized for this project, which includes:

Enhanced Communication with Team Members
Due to the realistic but aggressive schedule, we will implement bi-weekly standing meetings with the City to provide regular project updates and allow for timely feedback and input to keep the project design process moving forward. Another communication tool we have effectively implemented is a simplified file repository through the Microsoft Teams environment where we will post current schedules, meeting agendas and minutes, final deliverables and other pertinent documents so the City would have access to them at any time.

Implementation of these two strategies will enhance the flow and transparency of project information.

Effective Cost Control
Control of project costs and unnecessary design changes are important elements of any project. It is our duty to inform the City as soon as possible of any potential or proposed design revisions that will affect the established scope, schedule, or budget. Keeping all parties informed of any potential issues/changes in timely and continuous manner through regular communication is vital to controlling cost and schedule. Additionally, we receive weekly budget reports so we can track costs against our progress in real-time and make adjustments before issues arise.

City Council/RSA Agenda 130 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 25 ends

Auditable QA/QC Documentation
Mark Thomas believes that QA/QC is a company-wide effort.

Throughout the duration of the project, we will implement and adhere to a QA/QC program in accordance with our Quality Management Manual. This document clearly defines our firm’s quality management system and ensures implementation of the Company’s quality policies at all levels.

With over 40 years of experience, Mike Cooper, PE, will develop and oversee our QA/QC program for this project. All team members will adhere to this Plan and each of our team members supports the idea that it is our responsibility to produce high-quality products that will result in developing a clearly defined and cost-effective project.

We will operate under a Total Quality Management system of which a specific QC Plan is only a part of the overall system. The Total Quality Management program is a continuous process, used not just at project milestones, but on a regular basis.

SCHEDULE
Maintaining an accurate, up to date project schedule is critical to the overall success of a project and has a direct correlation to maintaining project budgets. Shawn will be responsible for controlling project design efforts and deliverables by developing a comprehensive critical path method (CPM) schedule that identifies all necessary tasks and interrelationships required for a project. It is particularly important to drive this project forward and focus our efforts on the critical path as meaningful progress is required to meet Alameda CTC requirements. To keep us on track and provide transparency across the project team we will be updating the schedule every other week to track progress closely.

We prepared an
abbreviated schedule
(as shown to the
right) based on the
information from the
RFP. We anticipate
the 30% design
completed within
6 months upon
receipt of NTP, and
final design to be
completed within 12
months after receipt
of Final Design NTP.

SCOPE OF SERVICES
We are in general agreement with the scope of services as laid out in the RFP. If selected, we will develop a detailed scope of work in collaboration with the City.

PROJECT MANAGEMENT PLAN

PROJECT QUALITY PLAN

ACCURATE DELIVERABLES
PROJECT ENGINEER Ongoing Reviews &
Guidance During Development
Quality & Accuracy Checks
Consistency & Compliance PROJECT MANAGER
TECHNICAL SPECIALISTS Independent Reviews
Interdisciplinary Reviews
Constructability Reviews

DISCIPLINE LEADS /

CONSTRUCTION MANAGER
2022 2023

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG NTP
Data Collection and Review
PDR Process
Engineering Reports
30% Design

FINAL DESIGN NTP
Permiting & Right of Way
65% Design 100% Design
Bid
Phase
City Council/RSA Agenda 131 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 1 of 17

QUARRY LAKES PARKWAY
Union City Project No. 18-04
Prepared by MARK THOMAS
Date: November 23, 2021

PRELIMINARY DESIGN REPORT
The purpose of this Preliminary Design Report (PDR) is to provide Union City (City) with a project definition, a compilation of the most important issues, the design criteria to be used to generate 30% plans, cost analysis, and construction schedule. This PDR was prepared to fulfill the requirements listed in the RFP evaluating qualifications for selecting a design consultant, per RFP Section III.A.2. Technical Approach.

The PDR includes seven sections as follows:

I. Introduction
II. Background and History
III. Policy and Design Criteria
IV. Design Basis
V. Construction Considerations and Schedule
VI. Cost Analysis
VII. Attachments
I. INTRODUCTION
The City of Union City (City) proposes to construct new multimodal local streets and roadways that connect neighborhoods, parks, schools, and jobs, and enable the build-out of the Station District Area at the Union City BART Station. The ultimate Quarry Lakes Parkway (QLP) begins at Mission Boulevard (SR 238) in Union City near Appian Way and continues to Paseo Padre Parkway and Decoto Road in Fremont.

Overall, the QLP will consist of two general vehicular travel lanes in each direction, buffered bike lanes, and wide sidewalks on each side of the roadway. QLP will feature landscaped medians and planting areas between sidewalks and the roadway. A two-way multi-use path is also envisioned along the north side of the roadway.

Within the City, the route crosses BART and UPRR tracks, the Line M Channel, and AlvaradoNiles Road to connect to the top bank of Old Alameda Creek. The route is segmented into four phases for the purpose of this PDR as Phase 5 will be analyzed in future years. All four phases will undergo 30% design concurrently. Phase 1 (7th Street Connection) and Phase 2 (Gateway Connection) are complete streets projects that will then proceed to final design. Phases 3 and 4 involve grade separations under BART and UPRR tracks. Phases 3 and 4 will move from 30% design to final design at a later date. QLP will include underground utilities, including electricity, City Council/RSA Agenda 132 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 2 of 17 natural gas, sewer and water delivery, improved storm water collection, and high-speed fiber communications.

The purpose of this Preliminary Design Report is to document initial design issues and considerations for all four phases of the project within the City.

II. BACKGROUND & HISTORY
Originally known as the I-880 to Mission Boulevard East-West Connector (EWC), the project was initiated by the Alameda County Transportation Authority (now Alameda CTC) under the 1986 Measure B. The EWC project would construct an improved east-west connection between I-880 and Mission Boulevard (SR 238). The Alameda CTC EWC project would include new roadways, widening of Decoto and Paseo Padre Parkway, and improvements to intersections along Decoto Road, Fremont Boulevard, Paseo Padre Parkway, Alvarado Niles Road and Mission Boulevard. The Final Environmental Impact Report was approved in 2009. The cost estimate from scoping to construction totaled over $300 million. Although design efforts continued, they were halted in late 2011 due to insufficient funding. In 2014, Alameda County Measure BB funded some work activities, including right of way acquisition, UPRR and BART grade separated designs, and environmental mitigation. The highway-like elements of the project and its high costs were unpopular with communities in Union City.

In March 2018, the City gained approval from Alameda CTC to implement the project. This allowed the City to re-envision QLP as a “Complete Streets” project that would support new development around the Union City’s Station District by improving circulation for all modes of travel. QLP would be designed to carry local bus, deliveries, emergency vehicles, car, bicycle, and pedestrian trips in and out of the new community of homes and offices in the Station District. The City has moved forward with scoping and phasing of the re-envisioned QLP project and has now issued this request for proposals for 30% design of all four phases.

III. POLICY & DESIGN CRITERIA
A. POLICY
The re-envisioned QLP is a Complete Streets project that balances the needs of all modes of travel. The Complete Streets Act of 2008 (Assembly Bill 1358) requires that cities and counties, upon any substantive revision of the circulation element of the General Plan, must plan for a balanced, multimodal network that meets the needs of all users. Union City’s General Plan Circulation Element (Chapter 5 – Mobility, 2019), is consistent with the Act, and includes the future QLP project. The vision for the QLP project is consistent with MTC’s Plan Bay Area 2050, the Union City Station District Draft Specific Plan, Union City’s Bicycle and Pedestrian Master Plan (2021), and Union City’s Complete Streets Policy (2018).

B. DESIGN CRITERIA
This stage of the QLP project is to complete 30% level engineering for Phases 1, 2, 3 and 4, complete all engineering reports required for Phases 1 and 2, and prepare a landscape corridor concept, hydrology, hydromodification, water quality, drainage and utility requirement reports City Council/RSA Agenda 133 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 3 of 17 for Phases 1, 2, 3, and 4. The work requires the performance of the PDR process to document design decisions, refinements, policies, procedural requirements, right of way, permitting, and final design scoping. At the completion of this phase, the last PDR documentation will be the preparation of the 30% level plans which will include title, typical sections, plan and profile, utility, storm drainage and striping layout for Phases 1, 2, 3 and 4 (no structural details are required for Phases 3 and 4).

Design is to be in accordance with local, state, and federal laws and regulations that pertain to multi-modal roadway design, including Union City’s Standard Details. Current policies, design criteria and guidelines for urban complete streets include but are not limited to:
• AASHTO Policy on Geometric Design of Highways and Streets 2018 • CALTRANS Highway Design Manual – 7
th Edition, Manual on Uniform Traffic Control
Devises, Erosion Design, Control Toolbox, Chapter 4: Erosion Control and Design Information Bulletin 89-01: Class IV Bikeway Guidance
• NACTO Urban Street Design Guide (2013), Transit Street Design Guide (2016) and Urban Bikeway Design Guide (2014), Don’t Give Up at the Intersection (2019), Urban Street Stormwater Guide (2017).
• Design guidance from AC Transit, Bay Area Stormwater Management Agencies, Americans with Disabilities Act, Alameda County Flood Control & Water Conservation District.

IV. DESIGN BASIS
The purpose of the 30% design effort is to develop the design basis for all four Phases within the City limits. The coordination between Phases 1, 2, 3 and 4 is critical to the City’s overall vision for a vibrant community with a thriving circulation and transit system along with green infrastructure. Addressing keys issues early will be critical to managing and controlling costs and risks which will keep the project on schedule and within budget.

A. PHASE 1 – 7TH STREET CONNECTION
Phase 1 constructs new roadway from 7
th Street to Mission Boulevard (SR 238) near Appian
Way, where 7th Street curves east to front the City maintenance yard and Drigon Dog Park. This phase involves improvements at the Mission Boulevard and a new intersection at 7 th Street.

1. Mission Blvd/SR 238 Intersection
This phase includes widening of Mission Blvd, two left turn lanes from northbound Mission Blvd to new QLP and two right turn lanes from southbound Mission Blvd to QLP at the intersection of Mission Blvd/SR 238 and associated drainage improvements.

This new connection with a major arterial (Mission Blvd) will improve overall traffic throughout these corridors and new access for residents into Appian Way.

2. Connection to Corporation Yard & Drigon Dog Park
Phase 1 realigns 7th Street, provides a formalized intersection with improved access for residents into Chesapeake Drive, and provides additional parking for the UC Corporation City Council/RSA Agenda 134 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 4 of 17 Yard and Drigon Dog Park. This also includes the construction of new sidewalk along the west leg to create a 3-leg intersection.

3. Realign M Channel
Phase 1 constructs new Line M channel, diversion structure, and box culvert. This phase involves all 7th Street and QLP drainage improvements within phasing limits to connect to new culvert.

B. PHASE 2 GATEWAY CONNECTION
Phase 2 constructs a new roadway between Old Alameda Creek/Fremont City Limits and Alvarado-Niles Road. It realigns Quarry Lakes Drive from Isherwood Way to Osprey Drive and constructs a new intersection with Quarry Lakes Drive. This phase involves an outfall structure and bioretention basins for stormwater runoff pumped from depressed QLP in Phases 3 and 4.

Options for creative ways to make bioretention basins useable during non-rain events are sought.

1. Alvarado-Niles Road Intersection
This phase constructs QLP and Alvarado-Niles Road intersection with 3 legs with associated drainage improvements and maintains existing sidewalk along the east leg of the intersection.

2. Quarry Lakes Drive Intersection and Quarry Lakes Drive Realignment This phase realigns Quarry Lakes Drive from Isherwood Way to Osprey Drive. This phase constructs new QLP and Quarry Lakes Drive intersection to be 2 leg intersection while limiting roadway and streetscape improvements along the west leg and ending earthwork limits at the bridge. This phase builds all improvements along Quarry Lakes Drive and the roadway between the proposed detention basins to connect to Osprey Drive/Kinglet Court intersection.

3. Monterra Terrace/Osprey Drive Intersection
Phase 2 constructs conforms along Alvarado-Niles Road including modifications to the intersection and traffic signal at the Monterra Terrace/Osprey Drive intersection.

4. Drainage Facilities
This phase constructs a 72" RCP diversion line within phasing limits. This includes construction of remaining drainage improvements along QLP, Quarry Lakes Drive, and Alvarado-Niles Road.

5. Outfall Structures
This phase involves the construction of a 72" RCP outlet into Old Alameda Creek and connection of 72" RCP at storm drain manhhole east of Alvarado Niles Road.

6. Bioretention Basins
Phase 2 constructs both drainage basins west of Alvarado Nile Rd that will provide flow control through the attenuation of the design storm runoff.

City Council/RSA Agenda 135 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 5 of 17 C. PHASE 3 11TH STREET CONNECTION (7TH STREET TO 11TH STREET) QLP in this phase, from 7th Street to 11th Street will be depressed under UPRR’s Niles Subdivision. 11
th Street will be extended, and intersection will be improved.

1. QLP Roadway from 7th Street to 11th Street
Phase 3 constructs QLP improvements from existing BART rail embankment limits to conform to 7th Street/QLP intersection constructed during Phase 1. This work includes retaining walls and maintenance roads within Phase 2 limits and wall structures adjacent to new drainage channel Line M.

2. 11th Street Extension & Traffic Signal
Phase 3 includes the extension of 11th Street and the installation of a new traffic signal at QLP/11th Street intersection.

3. QLP Grade Separation over UPRR’s Niles Subdivision
This includes construction of UPRR and protection of existing Green Street bridge and all grade separation and bridge improvements for UPRR line. This includes construction of interior walls, retaining walls and grade separation structure between QLP and UPRR.

4. UPRR Railroad Shoofly
Phase 3 constructs temporary track to allow passage and bypass around the construction site.

5. Pump Station & Drainage facilities
This phase includes the construction of drainage improvements east of UPRR bridge which would be connected to a newly built pump station. The pump station would be activated to pump drainage to drainage basin constructed during Phase 2 via 24" RCP.

This phase involves the construction of a detention basin east of Alvarado Niles Rd.

D. PHASE 4 GRADE SEPARATIONS (11TH STREET TO ALVARADO-NILES ROAD) QLP in this phase will be depressed under BART and UPRR Oakland Subdivision tracks. A pump station is needed to move stormwater to the bioretention basins in Phase 2. Intersection improvements will be added where QLP conforms with Alvarado-Niles Road and at Monterra Terrace/Osprey Drive/Alvarado-Niles Road.

1. QLP Roadway from 11th Street to Alvarado-Niles
Phase 4 constructs the remaining QLP improvements to connect Alvarado Niles Road to limits of Phase 3 work. This phase includes all remaining retaining wall and maintenance roads within the phasing limits. This involves conforming to Phase 2 work and the construction of the 4th leg of the QLP/Alvarado-Niles Road intersection.

2. QLP Grade Separation over BART track Shoofly/Bus Bridge, UPRR Oakland Subdivision
Phase 4 includes grade separation work and BART bridge. This phase constructs interior walls, retaining walls and grade separations between QLP and BART, and QLP and City Council/RSA Agenda 136 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 6 of 17 UPPR (Oakland Subdivision) including BART track shoofly/bus bridge and UPRR railroad shoofly.

3. Pump Station & Drainage Facilities
Phase 4 constructs remaining drainage improvements to connect to pump station. This involves completing 72" RCP diversion pipe connection between Phase 1 and Phase 2.

This would allow outlet into diversion pipe from diversion structure built during Phase 1.

E. ENVIRONMENTAL & SITE ISSUES

1. Permits & Environmental Mitigation
A key consideration of the permitting strategy will be whether to seek permits for the different phases of the project or to permit Phases 1 through 4 at the same time. It is probable that the resource agencies may require combining some or all phases in the permitting in order to assess the “whole of the project.” There are efficiency gains to be had by permitting Phases 1 through 4 at the same time in terms of a singular permitting process with each agency and combining mitigation requirements.

If permitting is ultimately pursued for all phases, a phased approach to mitigation should be pursued so that mitigation is only purchased implemented in phase with impacts, in order to avoid inordinate mitigation costs for the initial phases.

A permitting strategy was developed for the EWC, including identifying the permits required. The project will update and revise the prior permitting strategy to address the current plans for phasing, updated regulatory agency requirements, and current mitigation options. Initial analysis indicates that:
a. Phase 1 will require permits for realignment of the Line M channel and potentially for filling of a portion of Basin 2C. Basin 2C is a mitigation wetland created for mitigation of the adjacent residential development. The RWQCB has previously indicated that it is reluctant to permit filling in of a prior mitigation site and will mandate a high ratio as part of permitting (previously they have cited a 10:1 ratio).

Phase 1 will require permits from USACE, CDFW, and RWQCB and consultation with USFWS regarding potential habitat for listed federal species. b. Phase 2 does not cross any waters or wetlands, but may affect areas considered upland habitat for listed federal or state species within proximity to Old Alameda Creek. In addition, if any stormwater infrastructure requires encroachment into jurisdictional areas of Old Alameda Creek, that project element could trigger permitting from USACE, CDFW and/or RWQCB.
c. Phase 3 will affect the remainder of Basin 2C, Line M and the “New Basin.” Agencies are likely to demand that the effects of Basin 2C and Line M should not be split into two permits.

City Council/RSA Agenda 137 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 7 of 17 d. Phase 4 will affect Old Alameda Creek and the Alameda Creek Flood Channel along with adjacent riparian and upland habitat.

2. Hazardous Materials
The results of the Phase I ESA indicated that there have been a number of historic uses in the vicinity of the Quarry Lakes Parkway project, many of which likely resulted or have resulted in remnant impacts to soil and groundwater within the proposed construction corridor. Historic uses in the project vicinity included agricultural crops, rural farms/ranches, steel manufacturing at the Pacific States Steel Corporation (PSSC) property, Union City Corp Yard, and rural transportation and rail corridors.

Significant remediation was conducted under oversight of the Department of Toxics Substance Control (DTSC) and the Regional Water Quality Control Board (RWQCB) at the former PSSC property. Remediation included creating a deed restricted area referred to as the Waste Containment Area (WCA) where contaminated debris from the PSSC facility cleanup was allowed to be managed in place adjacent to the proposed Quarry Lakes Parkway alignment.

Various phases of soil and groundwater testing were conducted from 2010 to 2016 which confirmed that soil and groundwater present within the Quarry Lakes Parkway project limits will require special attention and handling during construction. Chemicals of concern include petroleum hydrocarbons, metals, aerially deposited lead, chlorinated pesticides, and various waste products including metal slag.

Phase II ESA studies were conducted and have also documented that existing structures on farm lands which are to be redeveloped contain hazardous building materials including lead-based paint, and given the age of the structures may also contain asbestos and polychlorinated biphenyls (PCBs). Soils in the vicinity of the farm areas also were shown to contain elevated concentrations of agricultural and pest management chemicals.

The existing chemical data from studies and remedial activities conducted by others, coupled with the data collected during the various Phase II ESA’s represent sufficient data for the development of a Hazardous Materials Report for the areas within Phases 1-4 of the Quarry Lakes Parkway corridor.

The Hazardous Materials Report will inform the design team regarding:
a. The areas of potential hazardous materials/wastes and potential contaminated materials/wastes within the contraction area,
b. The regulatory interaction which is required with the DTSC given the proximity to the known and regulated PSSC’s WCA and the work areas in the general vicinity where slag and other waste materials have been observed outside of the WCA, c. Interaction with Alameda County Water District (ACWD) and the RWQCB regarding construction dewatering water management and construction practices in proximity to the top of the Newark Aquifer, and
City Council/RSA Agenda 138 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 8 of 17 d. Best management practices to be implemented during construction to minimize the potential exposure to construction workers, the general public, and the environment due to elevated concentrations of certain chemicals of concern within the proposed transportation corridor.

F. DRAINAGE AND STORMWATER ISSUES

1. Floodplains
The QLP alignment crosses the Alameda Flood Control Channel and Line M Channel, which are identified within the 100-year flood boundary. The Line M Channel bed and sides are mainly unlined with earthen embankments. According to the FEMA FIS, the principal flooding problem in the vicinity of the project site is caused by sheet flow and interior drainage. The sheet flooding events could occur very frequently. The flooding along the Line M Channel is likely caused by the existing undersized channel and the channel has two 90-degree bends near the City’s corporation yard. The project is within Zone X (above the base flood) and Zone AH (shallow flooding).

2. Drainage design
Drainage design criteria, if not available with the City, will be taken from the Alameda County Hydrology and Hydraulics Manual (ACHHM), Alameda Flood Control and Water Conservation District (AFC&WCD) 2016 and the Caltrans Highway Design Manual (HDM). This project is part of the Alameda Creek watershed. The drainage design will adhere to the Alameda County Water District’s requirement of minimum 5 feet of “no disturb zone” from the Newark Aquifer within the project area.

3. Line M Channel
Phase 1 of the QLP Project alignment will cross a section of the Line M Channel. The Line M channel is subject to flooding issues. We propose addressing the crossing with a Reinforced Box Culvert (RCB). A diversion structure and pipe would bypass some of the flows from the Line M Channel and discharge the flows to Old Alameda Creek. The Old Alameda Creek ultimately outfalls into Alameda Creek Flood Control Channel (ACFCC). We propose some improvements to the existing Line M channel next to the City’s maintenance yard to contain the remaining flow in the channel. The diversion pipe from the Line M Channel will go through the depressed section of the Phase 3 alignment and cross the Union Pacific Railroad (UPRR) and BART tracks. The channel ultimately drains to Old Almeda Creek.

4. Hydromodification
Projects that create or replace 1 acre or more of impervious area and are in areas susceptible to hydromodification impacts should include hydromodification mitigation measures. The ACCWP’s Hydromodification Susceptibility Map Application has determined the project is within a white area that drains to an earthen channel. Therefore, the Project is required to consider hydromodification impacts or propose hydromodification management measures. Bioretention areas, underground treatment areas proposed for stormwater treatment will provide hydromodification management.

City Council/RSA Agenda 139 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 9 of 17

5. Stormwater
The Stormwater Management Plan for the Project would characterize the water resources (e.g., surface water, stormwater, and groundwater) within the Project area, assess the potential environmental consequences to these water resources from the proposed improvements, and discuss measures designed to avoid or minimize these impacts.

A discussion of the measures to comply with the CGP, including a risk level determination and a description of the BMPs proposed for the Project, would be included in the plan.

Runoff from the roadway will be collected through the City’s storm drain systems at various locations and then discharged into the Line M Channel on the east side, ACFCC on the west side of the Project site ultimately discharges into San Francisco Bay. The following are the general standards will be used for this project:
• A 10-year recurrence interval storm event will be used for the pipes and for the inlet capacity calculations. The minimum pipe size for the drainage mains is 15 inches (in.) reinforced concrete pipe (RCP) and 12 in. RCP for drainage laterals. The runoff would be intercepted by an appropriately sized drainage structure and piped to the nearest storm drain in the street.
• Concrete backfill will be proposed where minimum cover is not available. The maximum spacing between the manholes will be 300 feet. Manholes will be placed at locations where pipe material changes, where two or more pipes connect, where the pipes sizes change, or where pipes are at sharp angles (greater than 10 degrees). • Alameda Countywide Clean Water Program’s (ACCWP) C.3 Stormwater Technical Guidance Handbook will be used to design the biofiltration swales, bioretention swales, and underground infiltration systems.
• Caltrans standard structures such as slotted drains, clean-outs, and headwalls will be used.

6. Stormwater Treatment
The QLP project adds a significant amount of new impervious area. The design team would explore solutions to achieve the maximum extent practicable and cost-effective stormwater treatment for this project.

We understand that stormwater treatment can be considered off-site in the same watershed which may have more available right-of-way and have more critical water quality goals such as industrial areas. City projects that create and/or replace 10,000 ft² (0.23 acres) or more of impervious area are required to implement post-construction stormwater controls per the Municipal Regional Stormwater National Pollutant Discharge Elimination System (NPDES) Permit (MRP, Order R2-2015-0049). Stormwater treatment measures that are applicable to the project include:
• Bioretention Area (swale)/Rain Garden
• Bioretention basin/Underground infiltration system
• Flow-Through Planter Boxes
City Council/RSA Agenda 140 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 10 of 17 • Tree Well Filters
• Pervious Paving/Sidewalks
• Sidewalks with galleries underground
• Turf blocks and permeable joint pavers

7. Stormwater detention basins
The EWC design included outdated infiltration basin concepts. To address the stormwater treatment requirements of the project, the team will explore the use of underground infiltration galleries to maximize land use.

Phase 3 of the QLP Project will impact an existing detention basin known as “New Basin.” To mitigate this impact, we propose a new underground detention system to be located on the west side of the BART tracks. This new detention system can be installed with plastic, metal pipe, or concrete pipes so that the area can be used for community park space.

8. Drainage coordination between segments
To keep the depressed roadway in Phases 3 and 4 dry, groundwater, runoff and bypass flows will be discharged into Phase 2 detention basins. The original design of the EWC called for a detention basin in the southeast quadrant of the intersection of QLP and Alvarado-Niles Road. Upon review, the size and location can be redesigned for cost and schedule savings. The team proposes placing pumps in vaults in the proposed medians where they are at least 10 feet wide. The vault would be flush with the median and accessed by a hatch. The median in the area would have a mountable curb for maintenance vehicles. Electrical equipment would be located in a prefab Motor Control Center (MCC) building at the top of the embankment. The slab foundation could span an underground vault for water storage as deemed appropriate. A detention system could be built under the MCC building. This strategy was implemented for the Paseo Padre Parkway grade separation in Fremont. Although electrical and mechanical equipment would not be co-located, the strategy reduces excavation for a large pump building, simplifies maintenance access, adds space for green infrastructure, and reduces construction duration and cost. Most importantly, it keeps electrical equipment away from potential flooding in the roadway.

G. GEOMETRY AND DESIGN ISSUES

1. Phases 1 and 2
For Phase 1 and 2 it is critical to develop the appropriate cross sections as well as set the foundation for the horizontal and vertical profiles for all four phases. The grading for Phase 1 and 2 is generally straightforward and stays close to the existing ground except for filling in of some drainage and detention features. Phase 1 will need to consider impacts to the Union City Corporation Yard and the Drigon Dog Park. Phase 2 will need to coordinate with the Gateway Site Developer (City Ventures) to allow for an intentional transition and appropriate setback for housing from the roadway.

City Council/RSA Agenda 141 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 11 of 17 • Typical Cross-Section. The cross-section of QLP will need to be closely analyzed to meet the needs of current and future users through complete streets design. Phasing may also be considered. It is critical to stay within the existing study limits as defined in the EWC EIR so the project does not need to reopen the CEQA process due to increased impacts.
• Vertical Profile. The vertical profile for Phase 1 and 2 stays close to the existing ground but will need to consider implications and study what that will do for Phases 3 and 4 as they go beneath the existing BART and UPRR tracks. The vertical profile will be controlled by the rail lines as discussed in more detail below and above the Newark Aquifer.
• Gateway Site Development. Coordination with the Gateway Site is important as QLP will carry the needed mainline utilities to serve the development. The project cross section may also be affected depending upon the residential unit placement and the product type that is planned to be constructed. The QLP project will likely be constructed before the development so coordination and confirmed assumptions will need to be agreed upon before utility infrastructure design is complete. • City Corporation Yard & Drigon Dog Park. The realignment of 7th Street as a part of Phase 1 will allow for a new parking area that will serve Drigon Dog Park as well as the City Corporation Yard. The realignment will also need to be closely coordinated in design and construction with the Corporation Yard uses as transit and maintenance vehicles are stored and maintained there. Providing infrastructure for the planned conversion to an electric fleet should also be considered.

2. Phases 3 and 4
For Phases 3 and 4 roadway concepts, the railroad permanent and temporary designs should be developed to a conceptual level at this early stage, along with the roadway in Phases 1 and 2. This will require structures advance planning studies, railroad shoofly designs and conceptual construction staging to ensure that high risk items are understood in early development to avoid costly impacts to utilities, right of way and hazardous materials. The design must consider the constraints of BART, UPRR and AMTRAK revenue service operations and future ACE commuter rail operations as well as other multi-modal operations.

When developing the roadway plan and profile, the four main components of the rail design to consider are:
• Track design permanent alignment. Track design requires close coordination with several engineering disciplines including roadway, structures, drainage, and systems such as traction power, train control, and communications.

BART’s alignment is constrained by Union City Station outboard platform at the north end. The existing tracks are on a tangent alignment centered in the BART ROW. Maintaining the existing alignment is the most efficient design as it will keep City Council/RSA Agenda 142 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 12 of 17 existing features in tack such as traction power, train control, communication which are costly to relocate and can cause significant construction delays due to testing and commissioning requirements. One of the first orders of work should be to conduct surveys of the existing facilities early in design to verify alignments, profiles and utilities. In addition, early confirmation of BART’s design criteria requirements is critical such as minimum 14’ vertical clearance between bridge soffit and roadway surface which directly impacts roadway design.

There are 2 UPRR corridors to consider: Niles Subdivision in Phase 3 and Oakland Subdivision adjacent BART ROW in Segment 4. The Niles Subdivision carries both freight and passenger rail (AMTRAK Capitol Corridor) and is constrained at the north end with an existing at-grade crossing at Decoto Road. Maintaining the existing alignment is the most efficient design as it will keep existing features in tack such as signal houses and positive train control (PTC) which are costly to relocate and can cause significant construction delays if not addressed early in design. In addition, early confirmation of UPRR’s design criteria requirements is critical such as 17’-6” vertical clearance between bridge soffit and roadway surface which directly impacts roadway design.
• Track design temporary alignment (shoofly). One of the primary challenges is to prepare construction phasing plans to minimize the duration of the cutovers from existing tracks to shoofly tracks and vice-versa. The cutovers are approximately 800 feet long at each end and will require the preparation of subgrade along with the installation of sub-ballast and bottom ballast as close as possible to the existing tracks to minimize the construction duration during the cutovers. Each track cutover must be performed during the same operational shutdown window. Minimizing the amount of construction activity required during this window is imperative.

BART & UPRR (Oakland Subdivision) - Impacts to BART’s operations must be minimized. The BART cutovers need to include traction power and systems in the cutovers along with testing and startup before trains can run on the shoofly tracks. A proposal to construct a BART 2-track shoofly to the east of the existing BART tracks has several advantages:
▪ Early relocation of track power and systems can be completed along with required testing without disruption to BART operations.
▪ Shoofly construction will not impact existing BART operations. ▪ Shoofly design minimizes impacts to hazardous materials identified in the corridor.
▪ Once BART shoofly is not required, the same track embankment can be used to construct UPRR Shoofly.
▪ The shoofly embankment can be repurposed for a future ACE corridor.

UPRR (Niles Subdivision) – Impacts to AMTRAK operations must be minimized.

The track cutovers need to include Positive Train Control (PTC) and signaling in the City Council/RSA Agenda 143 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 13 of 17 cutover design. A proposal to construct a 1-track shoofly to the west of the existing track has several advantages:
▪ The existing track is on a large radius and the shoofly can be designed for required 79 mph on a westerly alignment.
▪ The existing signal houses do not require relocation. ▪ Shoofly design minimizes impacts to hazardous materials identified in the corridor.
• Permanent bridge structures supporting tracks.

Structures: The structures over the roadway drive both the rail and roadway vertical alignments. There are two viable approaches to consider that will reduce roadway excavation. One is the use of a through girder type superstructure (concrete or steel) with the potential to eliminate a center pier. While BART may be amenable to this option, this is not UPRR’s preferred type of superstructure. The other is to use precast girders with composite deck (concrete). This will require center pier and has a shallow superstructure which will reduce roadway excavation. This second option is a typical UPRR structure type.

Foundations: Knowing the areas geotechnical requirements, deep foundations will be required for the RR structures. CIDH piles have the advantage of allowing for “topdown” construction and reducing shoring costs and construction durations.

3. Retaining Walls
Retaining walls will be one of the major cost items. However, if designed correctly, they can also result in significant cost and schedule savings. The retaining wall concept design in all four segments will be addressed early to maximize cost and schedule savings. The critical walls identified to date are:
• Phase 3 – retaining wall along north side of new roadway between Line M Channel and proposed roadway
• Phase 3 – perimeter retaining walls around entire depressed roadway section • Phase 4 – perimeter retaining walls around entire depressed roadway section In lieu of a cement deep soil mixing (CDSM) wall and separate retaining wall system, we propose integrating a cast-in-place (CIP) retaining wall with a CDSM wall system. This single-wall system could be placed at the top of embankments and would provide a “top down” construction method for excavating the depressed roadway. The advantages of this system are:
• As the method is the shoring system, it eliminates the need for other shoring, thereby reducing construction schedule.
• It provides a water barrier system, important where groundwater is high, thereby providing for a significantly less expensive dry excavation. • A CIP facing can be placed on the wall to integrate corridor-wide aesthetics.

City Council/RSA Agenda 144 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 14 of 17 • When combined with steel beams, the structural wall is only 3 ft wide. The smaller footprint allows for more flexibility for landscaping, green infrastructure, and utilities.

H. GEOTECHNICAL AND RELATED ISSUES

1. Soil Borings
Exploratory soil borings are required for pavement design (R-value testing), structural foundation design of the planned box culvert and bank stability/fill settlements evaluation. The proposed geotechnical investigation should include borings for pavement design and permeability/infiltration potential of the sand/gravel layer below the upper clay. This may include sampling of the sand/gravel, gradation distribution analysis tests, and laboratory permeability tests or field tests. It is our understanding that the intended “drainage layer” is the sand/gravel below the upper clay.

For Phase 1, there were limited existing boring data from the previous EWC study. It is anticipated the native soil will be generally stiff to very stiff clays through about Elev. 10 ft. overlying sand and gravel deposits. The existing grade and roadway finished grade (FG) is approximately Elev. 49 ft.

For Phase 2, the previous investigation (EWC Segment B, 2010/2011) indicated that the upper 15 to 20 ft native soils may consist primarily of fine-grained clays and silts. Below that, the borings encountered silty sand and gravel. Groundwater was encountered at approx. 25 ft depth (Elev. ~25 ft) in 2020. Minimal new embankment is anticipated for Phase 2. It appears that the main task for design is roadway pavement and drainage design for the planned outfall structure and bioretention basins.

2. Groundwater
In Phase 1, the groundwater level may be at 20 - 25 ft depth (approximate Elev. 29 to 24 ft.) according to USGS geologic data and ACWD monitoring well data. For the design for the previous EWC project (cut for Segment C, 2011), groundwater was assumed at Elev. 30 ft for long term design. We recommend site-specific soil borings to verify the groundwater level to inform the current design.

In Phase 2, groundwater was encountered at approximately 25 ft. depth (Elev. ~25 ft) in 2020. Minimal new embankment is anticipated for Phase 2. It appears that the main task for design is roadway pavement and drainage design for the planned outfall structure and bioretention basins.

I. ADMINISTRATIVE ISSUES

1. Environmental Clearance
Environmental clearance for the East-West Connector (EWC) was accomplished with an Environmental Impact Report (EIR) in 2009. By keeping the QLP alignment within the Area of Potential Effect (APE) cleared by the EIR, other differences between the former EWC can be documented with an addendum to the EIR. Changes to the roadway City Council/RSA Agenda 145 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 15 of 17 alignment outside the APE would necessitate a Supplemental EIR, which would require recirculation of the document and open it to legal action.

2. Right of Way
The City or other public entities own the majority of the right of way that will be required to construct the project. A right of way needs exhibit will be prepared during the final design phase to understand impacts and start the right of way or easement acquisition process.

3. Agreements and Other Coordination
The project is under the purview of several public entities and will require coordination and approvals and/or agreements. Coordination with private entities will also be critical for project development such as the Gateway Site Developer (assumed to be City Ventures) to understand utility needs so the required infrastructure can be built with Phase 2. Public and private entities include:
• City of Union City
• Union City Transit
• Gateway Residential Developer (City Ventures)
• Caltrans
• PG&E
• AT&T
• Comcast
• City of Fremont
• Alameda CTC
• Union Sanitary District
• Alameda County Water District
• Alameda County Flood Control & Water Conservation District • SF Bay Area Regional Water Quality Control Board
• East Bay Regional Park District
• Bay Area Rapid Transit District
• Union Pacific Railroad
• Pacific States Steel Corporation
J. REPORT SUBMITTALS

1. Existing Reports
There are several reports that were prepared as part of the EWC project and will need to be updated to reflect current design elements and design criteria/standards. These reports include:
• Landscape Concept Report
• Hydrology Report
• Hydromodification Report
• Water Quality Report
• Drainage Report
City Council/RSA Agenda 146 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 16 of 17 • Permit Requirement Report
• Materials / Geotechnical Report
• Hazardous Materials Report

2. New Reports
In addition to updating existing reports, new reports will include:
• Utility Company Requirement Report
• Design Deviation / Exception Report
• Lighting Concept Report
• Others, TBD
V. CONSTRUCTION CONSIDERATIONS & SCHEDULE
The start of construction is anticipated in late 2023 and construction completion by 2025 for Phases 1 and 2. The schedule for the remaining phases has not yet been determined. An approved construction staging plan is needed before a more detailed construction schedule can be developed. Construction staging is typically addressed at the PS&E design phase. Due to the complexity of this project, staging issues, constraints, and approaches will be considered at all design phases to facilitate a constructable design.

VI. COST ANALYSIS
A. ESTMATED COST
In the QLP Project Delivery Plan, project costs were estimated using the existing EWC project plans and other pertinent documents but did not consider new features or elements specific to QLP. Following the preliminary design process, a 30% level Engineer’s Estimate will be prepared as part of the 30% plans. This section will be filled out with more detail as design decisions are reached.

B. POTENTIAL COST INCREASES
Design development and estimated costs have yet to be determined. The following are two examples of challenges may pose risks to the project budget. This list will expand as we enter the design phase of the project and costs associated with these risks will be applied.

1. Permit Requirements
Resource agency permit requirements have changed over time and the availability of offsite mitigation options is limited. If mitigation banks are not available, the project may be required to complete mitigation via an offsite improvement or restoration project.

2. Railroad Coordination Requirements
Coordination and approvals with BART and UPRR will be required. A shoofly option to keep service operational during QLP construction will require reduced speeds due to the proximity to the Station Area. If speed reductions are not allowed there is a potential for upstream and downstream track re-construction.

VII. ATTACHMENTS:

City Council/RSA Agenda 147 Tuesday, January 11, 2022
Preliminary Design Report (Proposal-level) – Quarry Lakes Parkway Page 17 of 17 (This represents a sample list of attachments as none of these have been developed as a part of the proposal process)
A. Project Location Map
B. 30% Design Plans
C. Alternative geometry at Location X
D. Drainage Detail at Location X
E. Preliminary Construction Cost Estimate
F. Stage Construction Concept Plan
G. Vertical Clearance at Location X
H. Various Reports, etc.

City Council/RSA Agenda 148 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 26 ends

PROJECT STAFFING
Names and Classification
Sasha Dansky, Principal‐in‐Charge
Shawn O'Keefe, Principal‐in‐
Charge/ Project Manager
Danielle Sanchez, Deputy Project
Manager
Sr. Project Engineer (Various)
Project Engineer (Various)
Design Engineer II (Various)
Design Engineer I (Various)
Deputy District Manager (Various)
CM Division Manager (Various)
Operations Manager (Various)
LAUD Division Manager (Various)
Sr. Engineering Manager (Various)
Survey Division Manager (Various)
Sr. Project Surveyor (Various)
Sr. Sruveyor (Various)
Lead Survey Technician (Various)
Sr. Project Coordinator (Various)
Sr. Project Assistant (Various)
Hours
Mercurio / Design Manager
Barnard / Sr Structures Eng
Track Eng
Structures Eng
Hours
Steve Castellano, Managing
Consultant
Matthew Schock, Managing
Consultant
James Richards, Managing
Consultant
Hours
Mike Vidra Sr. Proj. Manager
Robert Stevens Sr. Proj. Manager
Christopher Ethier Engineer II
Hours
Jeriann Alexander, PE, Principal
Engineer
Karen Emery‐Tonkovich, PG,
Principal Geologist
Ecem Isleyen, Lead GIS Specialist
Marissa McCallum Technical Editor,
Word Processing
Hours
Lisa Spivak
Survey Manager
Jonathon Correa
Sr. Project Surveyor
Joe Vargas
Field Supervisor
Survey Analyst
Survey Technician
Survey Clerical
Party Chief
1 PROJECT MANAGEMENT 6 106 150 96 0 0 0 0 4 8 0 40 0 0 0 0 56 6 472 8 8 0 0 16 0 0 0 0 12 32 12 56 0 0 0 0 0 0 0 0 0 0 0 0 2 DATA GATHERING & REVIEW 0 0 0 40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40 0 0 0 0 0 0 0 0 0 0 16 0 16 0 0 0 0 0 0 0 0 0 0 0 0 3 PRE‐DESIGN REPORT (PDR) PROCESS 2 40 40 0 0 80 0 0 0 0 0 8 0 0 0 0 0 0 170 0 0 0 0 0 0 0 0 0 0 8 24 32 0 0 0 0 0 0 0 0 0 0 0 0 4 ENGINEERING REPORTS 0 11 44 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 59 50 40 60 40 190 0 0 0 0 0 16 80 96 40 40 20 20 120 0 0 0 0 0 0 0

4.1 Enginering Reports ‐ All Phases

4.1.1 Landscape Concept 1 4 4 9 000 0

4.1.2 Hydrology 14 5 000 0

4.1.3 Hydromodification 14 5 000 0

4.1.4 Water Quality 14 5 000 0

4.1.5 Drainage 14 5 000 0

4.1.6 Utility Requirement 14 5 0 0 16 80 96 0

4.1.7 Permit Requirement 14 5 000 0

4.1.8 Design Deviation/Exception 14 5 40 40 40 40 160 0 0 0

4.2 Engineering Reports ‐ Phase 1 & 2

4.2.1 Hazardous Materials 14 5 10 20 30 0 0 40 40 20 20 120

4.2.2 Materials/Geotechnicals 14 5 000 0

4.2.3 Lighting 14 5 000 0
5 SURVEY AND RIGHT OF WAY ENGINEERING 0 2 8 0 0 0 0 0 0 0 0 0 12 48 40 40 0 0 150 0 0 0 0 0 24 8 8 40 0 0 0 0 0 0 0 0 0 2 4 4 24 0 0 40

5.1 Topographic Survey 4 4 8 16 0 0 0 0 2 4 4 24 40

5.2 R/W Engineering ‐ Parcel Map 24 8 40 40 40 134 0 24 8 8 40 0 0 6 35% LEVEL OF DESIGN COMPLETION 6 42 80 44 136 280 280 16 0 0 16 0 0 0 0 0 0 0 900 10 20 40 40 110 0 0 0 0 0 0 0 0 10 10 0 0 20 0 0 0 0 0 0 0

6.1 35% Level Plans 4 24 64 40 120 240 240 16 16 764 10 20 40 40 110 0 0 0

6.2 Engineers Estimate 4 8 4 16 40 40 112 0 0 0 10 10 20

6.3 Environmental Clearance 144 9 000 0

6.4 Environmental Monitoring 24 6 000 0

6.5 Scope, Fee and Schedule 18 9 000 0
TOTAL Non‐On‐Call Tasks/Deliverables 14 201 322 180 136 360 280 16 4 8 20 48 12 48 40 40 56 6 1791 68 68 100 80 316 24 8 8 40 12 72 116 200 50 50 20 20 140 2 4 4 24 0 0 40 O1 Community Outreach 0 50 56 0 64 0 0 0 0 0 0 0 0 0 0 0 0 0 170 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O1.1 Stakeholder Engagement Plan 48 12 000 0
O1.2 Community Meetings (2) 16 16 16 48 000 0
O1.3 Coordination with the Bicycle and Pedestrian Advisory Committee (3) 12 12 24 48 000 0 O1.4 Website Management and Updates 24 6 000 0
O1.5 Meetings with Key Stakeholders or Groups 16 16 24 56 000 0 O2 Animated Simulations/Videos 0000000000000000000 00000 0000 0000 00000 0000000 O2.1 Animated Simulations/Videos 0 000 0
O3 Planning 0000000000000000000 00000 0000 0000 00000 0000000 O3.1 Planning Synthesis 0 000 0
TOTAL On‐Call Tasks/Deliverables 0 50 56 0 64 0 0 0 0 0 0 0 0 0 0 0 0 0 170 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 14 251 378 180 200 360 280 16 4 8 20 48 12 48 40 40 56 6 1961 68 68 100 80 316 24 8 8 40 12 72 116 200 50 50 20 20 140 2 4 4 24 0 0 40 Prime Consultant: Mark Thomas & Company, Inc. AECOM AR/WS CSW/ST2 Fugro Guida Surveying NON‐CONTINGENCY TASKS/DELIVERABLES
PROJECT NAME: Union City Project No. 18‐04, Quarry Lakes Parkway, Phase 1 (7th Street Connection) and Phase 2 (Gateway Connection)
ON‐CALL TASKS/DELIVERABLES
HOURS THROUGH 35%
City Council/RSA Agenda 149 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 27 ends

Names and Classification
1 PROJECT MANAGEMENT
2 DATA GATHERING & REVIEW
3 PRE‐DESIGN REPORT (PDR) PROCESS
4 ENGINEERING REPORTS

4.1 Enginering Reports ‐ All Phases

4.1.1 Landscape Concept

4.1.2 Hydrology

4.1.3 Hydromodification

4.1.4 Water Quality

4.1.5 Drainage

4.1.6 Utility Requirement

4.1.7 Permit Requirement

4.1.8 Design Deviation/Exception

4.2 Engineering Reports ‐ Phase 1 & 2

4.2.1 Hazardous Materials

4.2.2 Materials/Geotechnicals

4.2.3 Lighting
5 SURVEY AND RIGHT OF WAY ENGINEERING

5.1 Topographic Survey

5.2 R/W Engineering ‐ Parcel Map
6 35% LEVEL OF DESIGN COMPLETION

6.1 35% Level Plans

6.2 Engineers Estimate

6.3 Environmental Clearance

6.4 Environmental Monitoring

6.5 Scope, Fee and Schedule
TOTAL Non‐On‐Call Tasks/Deliverables
O1 Community Outreach
O1.1 Stakeholder Engagement Plan
O1.2 Community Meetings (2)
O1.3 Coordination with the Bicycle and Pedestrian Advisory Committee (3) O1.4 Website Management and Updates
O1.5 Meetings with Key Stakeholders or Groups
O2 Animated Simulations/Videos
O2.1 Animated Simulations/Videos
O3 Planning
O3.1 Planning Synthesis
TOTAL On‐Call Tasks/Deliverables
TOTAL
NON‐CONTINGENCY TASKS/DELIVERABLES
PROJECT NAME: Union City Project No. 18‐04, Quarry Lakes Parkway, Phase 1 (7th Street Connection) and Phase 2 (Gateway Connection)
ON‐CALL TASKS/DELIVERABLES
Chainman
Hours
Principal EngineerPrincipal Engineer
Supervising Engineer
Senior Lead Civil Engineer
Senior Civil EngineerSenior Civil Designer
Staff Civil EIT II
Staff Civil EIT I
Staff Civil EIT
Senior Env. Scientist
Env. Scientist II
Senior Technician
Technical Editor/Project
Coordinator
Hours
Rich Walter, ProjEct Director
Danielle Tannourji, PM/Permit Lead
Lindsay Christensen, CEQA Lead
Jennifer Oster, Deputy PM
Jennifer Haire, Wildlife Biology
Torrey Edell, Botany
Kevin MacKay, Restoration Design
James Elder, Archaeology
Jennifer Wildt, Archaology
Jonathon Rusch, Arch. History
Alan Barnard, Graphics
Melissa Johnson, GIS
Heatheer Hammermeister, Editory
Anthony Ha, Word Processor
Hours
Damian Stefanakis Principal Planner
Aaron Elias Associate Engineer
Hours
G. PARIKH; PRINCIPAL‐IN‐CHARGE
D. WANG; PROJECT MANAGER &
QA‐QC
F. WANG; SEN. PROJECT ENGINEER

PROJECT ENGINEER

STAFF ENGINEER

PROJECT GEOLOGIST

FIELD ENGINEER

LABORATORY TECHNICIAN

DRAFTING CADD TECH
Hours
0 0 2 8 12 16 0 0 0 0 0 0 0 0 12 50 45 36 0 0 0 0 0 0 0 0 0 0 0 0 81 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 8 0 4 8 8 0 36 4 4 12 12 4 4 0 4 16 8 0 0 0 0 68 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12 0 0 0 0 0 0 0 0 0 0 0 0 0 12 20 40 60 0 0 0 0 0 0 0 0 0 0 0 0 8 8 16 33 64 18 66 120 78 18 26 0 16 471 24 24 0 0 0 0 0 0 0 0 0 0 4 4 56 0 0 0 24 58 84 132 73 4 42 52 12 481 0 0 00 0
0 2 2 9 12 16 42 24 4 111 00 0
0 2 2 8 9 16 18 10 10 10 18 26 4 133 00 0
0 2 2 6 12 12 40 16 4 94 00 0
0 2 2 8 9 24 28 28 28 4 133 00 0
0 0 00 0
0 0 24 24 4 4 56 0 0
0 0 00 0
0 0 00 0
0 0 0 0 24 58 84 132 73 4 42 52 12 481
0 0 00 0
40 114 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40 114 0 00 0
0 0 00 0
0 0 6 6 18 24 24 0 36 40 40 0 0 40 0 234 48 16 64 60 12 8 4 6 12 16 8 8 12 12 286 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 6 18 24 24 36 40 40 40 234 00 0
0 0 00 0
0 0 24 40 60 8 8 2 12 12 8 8 8 8 198 0 0
0 0 8 24 4 4 40 0 0
0 0 16 16 4 4 4 4 48 0 0
40 114 16 22 46 73 88 18 110 168 118 22 34 48 28 791 133 80 76 72 16 12 4 10 28 24 8 8 16 16 503 20 40 60 24 58 84 132 73 4 42 52 12 481 00 00000000000000 000000000000000 000 0000000000
0 0 00 0
0 0 00 0
0 0 00 0
0 0 00 0
0 0 00 0
00 00000000000000 000000000000000 000 0000000000
0 0 00 0
00 00000000000000 000000000000000 000 0000000000
0 0 00 0
00 00000000000000 000000000000000 000 0000000000
40 114 16 22 46 73 88 18 110 168 118 22 34 48 28 791 133 80 76 72 16 12 4 10 28 24 8 8 16 16 503 20 40 60 24 58 84 132 73 4 42 52 12 481 HDR Engineering, Inc. ICF Kittelson Parikh
City Council/RSA Agenda 150 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 28 ends

Names and Classification
1 PROJECT MANAGEMENT
2 DATA GATHERING & REVIEW
3 PRE‐DESIGN REPORT (PDR) PROCESS
4 ENGINEERING REPORTS

4.1 Enginering Reports ‐ All Phases

4.1.1 Landscape Concept

4.1.2 Hydrology

4.1.3 Hydromodification

4.1.4 Water Quality

4.1.5 Drainage

4.1.6 Utility Requirement

4.1.7 Permit Requirement

4.1.8 Design Deviation/Exception

4.2 Engineering Reports ‐ Phase 1 & 2

4.2.1 Hazardous Materials

4.2.2 Materials/Geotechnicals

4.2.3 Lighting
5 SURVEY AND RIGHT OF WAY ENGINEERING

5.1 Topographic Survey

5.2 R/W Engineering ‐ Parcel Map
6 35% LEVEL OF DESIGN COMPLETION

6.1 35% Level Plans

6.2 Engineers Estimate

6.3 Environmental Clearance

6.4 Environmental Monitoring

6.5 Scope, Fee and Schedule
TOTAL Non‐On‐Call Tasks/Deliverables
O1 Community Outreach
O1.1 Stakeholder Engagement Plan
O1.2 Community Meetings (2)
O1.3 Coordination with the Bicycle and Pedestrian Advisory Committee (3) O1.4 Website Management and Updates
O1.5 Meetings with Key Stakeholders or Groups
O2 Animated Simulations/Videos
O2.1 Animated Simulations/Videos
O3 Planning
O3.1 Planning Synthesis
TOTAL On‐Call Tasks/Deliverables
TOTAL
NON‐CONTINGENCY TASKS/DELIVERABLES
PROJECT NAME: Union City Project No. 18‐04, Quarry Lakes Parkway, Phase 1 (7th Street Connection) and Phase 2 (Gateway Connection)
ON‐CALL TASKS/DELIVERABLES
Christopher Kent
Principal
Kari Tanaka
Senior Landscape Architect
Charla Kaul
Landscape Architect
Adrienne Newton
Lnadscape Designer
Rober Towar
Irrigation Designer
Hours
Ivana Micic, Principal in Charge
Mimi Ahn, Senior Landscape
Architect
Erika Cesarino, Designer
Esther Sam, Graphics
Hours
Jeremy Chrzan, Principal‐in‐Charge
Cindy Zerger, Project Manager and
Design Lead
Craig Schoenberg, Senior Engineer
Joel Shaffer, Engineer III
Megan Wooley‐Ousdahl, Planning
Lead
Inder Grewal, Planner II
Noah Halbach, Landscape DesignerSpencer Boomhower, Visualization Specialist
Hours
Daniel Yau / Engineer XII
Kin Chan / Engineer XI
Spencer Lee / Engineer VII
Jessica Wu / Engineer VI
Meng Yang / Engineer VI
Shannon Liao / Engineer III
Oscar Olais / Engineer I
Teresa Chan / Technician III
HoursHours
0 0 0 0 0 0 0 0 0 0 0 0 22 4 0 4 0 0 0 30 0 0 0 0 0 0 0 0 0 705 1 1 1 1 1 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 165 0 0 0 0 0 0 0 0 0 0 0 4 2 8 24 0 0 0 0 38 0 0 0 0 0 0 0 0 0 312 62 72 28 92 0 254 0 0 0 0 0 4 12 24 16 0 0 0 0 56 12 24 48 0 0 0 48 0 132 1915 62 72 28 92 254 0 0 0 263
00 0 0 116
00 0 0 138
00 0 0 99
00 0 0 138
00 0 0 101
00 0 0 61
0 0 4 12 24 16 56 0 221
00 0 0 155
00 0 0 486
00 0 12 24 48 48 132 137
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 304 00 0 0 130
00 0 0 174
55 80 35 45 30 245 0 0 0 0 0 4 8 40 24 0 0 0 0 76 18 48 80 32 0 0 88 64 330 2201 55 80 35 45 30 245 0 4 8 40 24 76 16 40 64 32 64 64 280 1709 00 0 2 8 16 24 50 182
00 0 0 207
00 0 0 46
00 0 0 57
118 153 64 138 31 504 0 0 0 0 0 12 44 76 64 4 0 0 0 200 30 72 128 32 0 0 136 64 462 5602 0 0 0 0 0 0 0 0 0 0 0 8 48 6 8 70 128 0 0 268 0 0 0 0 0 0 0 0 0 438 0 0 1 2 4 10 17 0 29
0 0 2 10 6 8 16 30 72 0 120
0 0 1 8 14 20 43 0 91
0 0 2 16 20 48 86 0 92
0 0 2 12 16 20 50 0 106
0 0 0 0 0 0 0 0 0 0 0 2 22 8 0 0 0 0 100 132 0 0 0 0 0 0 0 0 0 132 0 0 2 22 8 100 132 0 132
0 0 0 0 0 0 8 20 40 40 108 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 108 0 8 20 40 40 108 0 0 108
0 0 0 0 0 0 8 20 40 40 108 10 70 14 8 70 128 0 100 400 0 0 0 0 0 0 0 0 0 678 118 153 64 138 31 504 8 20 40 40 108 22 114 90 72 74 128 0 100 600 30 72 128 32 0 0 136 64 462 6,280 PGAdesign Y&C Transportation Consultants
TOTAL
ROMA Collaborative TDG Engineering
City Council/RSA Agenda 151 Tuesday, January 11, 2022
QUARRY LAKES PARKWAY PHASES 1 AND 2
City of Union City

MARK THOMAS

Page 29 ends

Names and Classification
Sasha Dansky, Principal‐in‐
Charge
Shawn O'Keefe, Principal‐in‐
Charge/ Project ManagerDanielle Sanchez, Deputy
Project Manager
Sr. Project Engineer (Various)
Project Engineer (Various)
Design Engineer II (Various)
Design Engineer I (Various)
LAUD Division Manager
(Various)
Sr. Engineering Manager
(Various)
Survey Division Manager
(Various)
Sr. Project Surveyor (Various)
Sr. Sruveyor (Various)
Lead Survey Technician
(Various)
Sr. Project Coordinator
(Various)
Sr. Project Assistant (Various)
Hours
Mercurio / Design Manager
Barnard / Sr Structures Eng
Structures Eng
Hours
Steve Castellano, Managing
Consultant
Matthew Schock, Managing
Consultant
Consultant II
Appraiser III
Hours
Mike Vidra Sr. Proj. Manager
Robert Stevens Sr. Proj.

Manager
Christopher Ethier Engineer II
Alisson Avancini Engineer I
Hours
Jeriann Alexander, PE,
Principal Engineer
Karen Emery‐Tonkovich, PG,
Principal Geologist
Hours
Jonathon Correa
Sr. Project Surveyor
Survey Technician
Party Chief
Chainman
Hours
Principal EngineerPrincipal Engineer
Supervising Engineer
Senior Lead Civil Engineer
Senior Civil Engineer
Staff Civil EIT II
Staff Civil EIT I
Staff Civil EIT
Senior Technician
Technical Editor/Project
Coordinator
Hours
7 65%‐100% LEVEL OF DESIGN COMPLETION 29 380 840 400 520 520 520 8 120 64 160 360 360 160 40 4481 36 104 320 460 180 160 240 240 980 140 24 440 440 1044 32 24 56 40 120 80 80 320 16 72 114 120 208 192 220 228 248 12 1430

7.1 Project Management 8 160 280 40 8 120 24 160 40 840 16 16 20 20 40 40 8 8 0 10 32 40 40 32 12 166

7.2 Survey/Right of Way Engineering 8 40 40 40 160 360 360 1008 0 160 160 240 240 960 0 0 40 120 80 80 320 0

7.3 Environmental/Permitting 16 64 120 200 0 0 0 8 8 16 0 0

7.4 65% PS&E 2 64 160 120 200 200 200 946 8 40 120 168 0 40 8 200 200 448 8 8 16 0 2 16 18 24 56 72 80 108 108 484

7.5 95% PS&E 2 64 160 120 200 200 200 946 8 40 120 168 0 40 8 160 160 368 8 8 16 0 2 16 48 48 96 96 108 88 108 610

7.6 100% PS&E 1 20 80 80 120 120 120 541 4 24 80 108 0 20 8 80 80 188 0 0 2 8 8 8 24 24 32 32 32 170 TOTAL Non‐On‐Call Tasks/Deliverables 29 380 840 400 520 520 520 8 120 64 160 360 360 160 40 4481 36 104 320 460 180 160 240 240 980 140 24 440 440 1044 32 24 56 40 120 80 80 320 16 72 114 120 208 192 220 228 248 12 1430 TOTAL On‐Call Tasks/Deliverables 000000000000000 0 000 0 0000 0 0000 0 00 0 0000 0 00000000000 TOTAL 29 380 840 400 520 520 520 8 120 64 160 360 360 160 40 4481 36 104 320 460 180 160 240 240 980 140 24 440 440 1044 32 24 56 40 120 80 80 320 16 72 114 120 208 192 220 228 248 12 1430 Prime Consultant: Mark Thomas & Company, Inc. AECOM AR/WS CSW/ST2 Fugro Guida Surveying NON‐CONTINGENCY TASKS/DELIVERABLES
PROJECT NAME: Union City Project No. 18‐04, Quarry Lakes Parkway, Phase 1 (7th Street Connection) and Phase 2 (Gateway Connection) ON‐CALL TASKS/DELIVERABLES
HDR Engineering, Inc.

Names and Classification
7 65%‐100% LEVEL OF DESIGN COMPLETION

7.1 Project Management

7.2 Survey/Right of Way Engineering

7.3 Environmental/Permitting

7.4 65% PS&E

7.5 95% PS&E

7.6 100% PS&E
TOTAL Non‐On‐Call Tasks/Deliverables
TOTAL On‐Call Tasks/Deliverables
TOTAL
NON‐CONTINGENCY TASKS/DELIVERABLES
PROJECT NAME: Union City Project No. 18‐04, Quarry Lakes Parkway, Phase 1 (7th Street Connection) and Phase 2 (Gateway Connection) ON‐CALL TASKS/DELIVERABLES
Rich Walter, ProjEct Director
Danielle Tannourji, PM/Permit
Lead
Jennifer Oster, Deputy PM
Jennifer Haire, Wildlife
Biology
Torrey Edell, Botany
Kevin MacKay, Restoration
Design
James Elder, Archaeology
Jennifer Wildt, Archaology
Jonathon Rusch, Arch. History
Alan Barnard, Graphics
Melissa Johnson, GIS
Heatheer Hammermeister,
Editory
Anthony Ha, Word Processor
Direct Expenses ($)Hours
D. WANG; PROJECT MANAGER
& QA‐QC
F. WANG; SEN. PROJECT

ENGINEER
Hours
Christopher Kent
Principal
Kari Tanaka
Senior Landscape Architect
Charla Kaul
Landscape Architect
Adrienne Newton
Lnadscape Designer
Rober Towar
Irrigation Designer
Hours
Cindy Zerger, Project Manager
and Design Lead
Craig Schoenberg, Senior
Engineer
Joel Shaffer, Engineer III
Hours
Daniel Yau / Engineer XII
Kin Chan / Engineer XI
Spencer Lee / Engineer VII
Jessica Wu / Engineer VI
Meng Yang / Engineer VI
Shannon Liao / Engineer III
Oscar Olais / Engineer I
Teresa Chan / Technician III
HoursHours
160 360 40 600 400 200 32 160 160 100 100 80 80 6,240 2472 20 20 40 88 93 170 160 135 646 36 80 32 148 40 96 120 104 120 120 152 144 896 12973 80 120 40 1,120 240 4 4 8 16 16 32 4 4 16 16 1390
00 0 0 0 2288
80 240 600 400 200 32 160 160 100 100 80 80 5,120 2232 0 0 0 0 2448 0 8 8 16 32 32 70 60 45 239 16 40 16 72 16 32 48 40 48 48 60 56 348 2737 0 8 8 16 20 20 50 50 45 185 16 40 16 72 16 32 48 40 48 48 60 56 348 2729 0 0 20 25 50 50 45 190 0 8 16 24 24 24 24 32 32 184 1381 160 360 40 600 400 200 32 160 160 100 100 80 80 10,860 2472 20 20 40 88 93 170 160 135 646 36 80 32 148 40 96 120 104 120 120 152 144 896 12973 0000000000000 0 0 000 00000 0 000 0 00000000 0 0
160 360 40 600 400 200 32 160 160 100 100 80 80 10,860 2472 20 20 40 88 93 170 160 135 646 36 80 32 148 40 96 120 104 120 120 152 144 896 12973 ICF Parikh PGAdesign Y&C Transportation Consultants
TOTAL
TDG Engineering

HOURS THROUGH FINAL DESIGN
City Council/RSA Agenda 152 Tuesday, January 11, 2022

CITY OF UNION CITY
Quarry Lakes Parkway

A D M I N I S T R AT I V E

SUBMITTALS
Form 1: General Information
Form 2: Levine Act Statement
Form 3: LBCE Program Participation Summary (separate sealed envelope) Form 4: Exceptions to City’s Standard Agreement
Form 5: Certificate of Proposer
City Council/RSA Agenda 153 Tuesday, January 11, 2022
City Council/RSA Agenda 154 Tuesday, January 11, 2022
City Council/RSA Agenda 155 Tuesday, January 11, 2022
City Council/RSA Agenda 156 Tuesday, January 11, 2022
City Council/RSA Agenda 157 Tuesday, January 11, 2022
City Council/RSA Agenda 158 Tuesday, January 11, 2022
City Council/RSA Agenda 159 Tuesday, January 11, 2022
City Council/RSA Agenda 160 Tuesday, January 11, 2022
City Council/RSA Agenda 161 Tuesday, January 11, 2022
City Council/RSA Agenda 162 Tuesday, January 11, 2022
City Council/RSA Agenda 163 Tuesday, January 11, 2022
City Council/RSA Agenda 164 Tuesday, January 11, 2022
City Council/RSA Agenda 165 Tuesday, January 11, 2022
City Council/RSA Agenda 166 Tuesday, January 11, 2022
City Council/RSA Agenda 167 Tuesday, January 11, 2022
City Council/RSA Agenda 168 Tuesday, January 11, 2022
City Council/RSA Agenda 169 Tuesday, January 11, 2022
City Council/RSA Agenda 170 Tuesday, January 11, 2022
City Council/RSA Agenda 171 Tuesday, January 11, 2022
City Council/RSA Agenda 172 Tuesday, January 11, 2022
City Council/RSA Agenda 173 Tuesday, January 11, 2022
City Council/RSA Agenda 174 Tuesday, January 11, 2022
City Council/RSA Agenda 175 Tuesday, January 11, 2022
City Council/RSA Agenda 176 Tuesday, January 11, 2022
City Council/RSA Agenda 177 Tuesday, January 11, 2022
City Council/RSA Agenda 178 Tuesday, January 11, 2022
City Council/RSA Agenda 179 Tuesday, January 11, 2022
City Council/RSA Agenda 180 Tuesday, January 11, 2022
City Council/RSA Agenda 181 Tuesday, January 11, 2022
City Council/RSA Agenda 182 Tuesday, January 11, 2022
City Council/RSA Agenda 183 Tuesday, January 11, 2022
City Council/RSA Agenda 184 Tuesday, January 11, 2022
City Council/RSA Agenda 185 Tuesday, January 11, 2022

OAKLAND
456 8th Street, Suite 200B
Oakland, CA 94607
(510) 844-5600
San José • Carmel • Cupertino • Fresno • Inland Empire • Irvine • Lakewood • Oakland • Roseville Sacramento • San Carlos • Walnut Creek
City Council/RSA Agenda 186 Tuesday, January 11, 2022

REQUEST FOR PROPOSAL (RFP) FOR
FINAL DESIGN OF PHASES 1 AND 2 FOR

QUARRY LAKES PARKWAY (EAST WEST
CONNECTOR), PROJECT NO. 18-04

PRE-PROPOSAL MEETING
AND
“MEET THE PRIMES” NETWORKING
TUESDAY - NOVEMBER 2, 2021
City Council/RSA Agenda 187 Tuesday, January 11, 2022
2 DESIGN RFP: QUARRY LAKES PARKWAY (QLP), PHASES 1 & 2
AGENDA
Pre-Proposal Meeting
1) Welcome/Safety Moment (Jesus Vargas, PM Consultant)
2) Union City Overview, Station District and Quarry Lakes Parkway (Marilou Ayupan, Public Works Director)
3) QLP Overview, Phases, General Project Issues (Marilou, PWD) 4) Proposal Requirements (Marilou, PWD)
5) AlaCTC LBCE Program (Trinity Nguyen, PM Consultant)
Meet the Primes Networking
Connect Primes with SLBE firms (Jesus/Sabrina, PM Consultant) City Council/RSA Agenda 188 Tuesday, January 11, 2022
3 DESIGN RFP: QUARRY LAKES PARKWAY (QLP), PHASES 1 & 2
1) WELCOME
2) SAFETY MOMENTS
City Council/RSA Agenda 189 Tuesday, January 11, 2022
UNION CITY OVERVIEW 4
James Logan HS
Station District
Retail Shops
Diverse Community
City Council/RSA Agenda 190 Tuesday, January 11, 2022
5 UNION CITY OVERVIEW
Who are were and where are we located…
City Council/RSA Agenda 191 Tuesday, January 11, 2022
6 UNION CITY OVERVIEW
City Council/RSA Agenda 192 Tuesday, January 11, 2022
7 UNION CITY OVERVIEW
OTHER INTERESTING FACTS ABOUT UNION CITY…
✓ Civic Center/City Hall: Architect Aaron G. Green (Frank Lloyd Wright) ✓ Only One High School, James Logan
✓ City Bus System - Union City Transit
✓ No “Compact Parking Stalls” Allowed
✓ Lowest Rec. fees for Soccer, Baseball, Tennis, Classes, Camps ✓ 1
st BART’s approved CSP (TOD) in 2001- Station District Area ✓ 1
st Dog Park & Skateboard Park in Bay Area (early 2000s) ✓ 1
st Krispy Kreme, 25-Screen Theater, Lowe’s, Texas Roadhouse, IFly ✓ 1
st Cannabis Retail “FLOR” at Union Landing (open Summer 2021) City Council/RSA Agenda 193 Tuesday, January 11, 2022
8 DESIGN RFP: QUARRY LAKES PARKWAY (QLP), PHASES 1 & 2

STATION DISTRICT AREA AND QLP
Critical for TOD/PDA & BuildOut of Station Area
Allows Completion of approx.
2,000 Housing Units
Multimodal Opportunities
-Improves Bike Connectivity
-Enhances transit service
-Supports future ACE Station
(MTC’s SoCo Rail Study)
City Council/RSA Agenda 194 Tuesday, January 11, 2022
MTC SOUTHERN ALAMEDA COUNTY INTEGRATED RAIL STUDY 9
Concept 1: Not possible
• Capacity constraints
Concept 2: ACE-Cap Corridor connection at
Ardenwood
• Connects to existing Express Bus service
• Dependent on South Bay Connect
• Ridership potential tied to Dumbarton service
Concept 3: ACE-BART connection at Union City
• Least impact on system operations
• Lowest infrastructure needs
• Compatible with long-term service concepts –
all current Dumbarton options serve UC BART
• Ridership potential: north/south on BART and
potential future Dumbarton connection
• Connection to existing multi-modal station
(BART/bus) and TOD (existing and planned)

MID-TERM RAIL SERVICE
City Council/RSA Agenda 195 Tuesday, January 11, 2022
10 PASSENGER RAIL SERVICE - ACE STATION

UNION CITY BART STATION
ACE-BART-TRANSIT WILL ALLOW:
✓ Southbound ACE Commuters to transfer
to BART Trains - Fremont/Innovation
Center, Milpitas BART (transfer to LRT)
to North San Jose (Jobs)
✓ Northbound ACE Commuters to transfer
to BART Trains - Hayward/Cal State East
Bay, Oakland and Beyond
✓ Westbound ACE Commuters to transfer
to DB Express: Stanford/Peninsula (jobs)
✓ Supports UC businesses & Station
District Area
✓ Connects Affordable Housing in Central
Valley to the Bay Area employers (Jobs)
“ONLY ACE TO BART RAIL-RAIL
CONNECTION IN ENTIRE BAY AREA”
City Council/RSA Agenda 196 Tuesday, January 11, 2022
11 QUARRY LAKES PARKWAY (Union City)
DECOTO COMPLETE STREETS (Fremont)
City Council/RSA Agenda 197 Tuesday, January 11, 2022
12 QUARRY LAKES PARKWAY, PHASES 1- 4
City Council/RSA Agenda 198 Tuesday, January 11, 2022
13 PROJECT PHASES & COSTS
PROJECT PHASES FINAL PS&E Right of Way
& Mitigation Construction

CM-RE &
DSDC
Support
TOTAL
Phase 1:
7th Street Connection
$ 2,023,000 $ 2,987,000 $ 10,150,000 $1,523,000 $16,683,000 Phase 2:

Gateway Connection
$ 2,198,000 $ 1,211,000 $ 14,650,000 $ 2,198,000 $ 20,257,000 Phase 3:
11th St. Connection
$ 9,165,000 $ 12,088,000 $ 61,100,000 $ 9,165,000 $ 91,518,000 Phase 4:

Alvarado-Niles Grade
Sep
$ 8,640,000 $ 2,401,000 $ 59,731,000 $ 8,900,000 $79,672,000 Phase 5:

Paseo Padre & Trail
$ 5,900,000 $ 3,200,000 $ 45,000,000 $ 5,900,000 $ 60,000,000 Fremont:

Decoto Road Multimodal
$2,175,000 $ 1,172,000 $ 14,478,000 $ 2,175,000 $20,000,000 Total $30,101,000 $23,059,000 $205,109,000 $29,861,000 $ 288,130,000 City Council/RSA Agenda 199 Tuesday, January 11, 2022
14 QUARRY LAKES PARKWAY & DECOTO

COMPLETE STREETS
Developing a Complete Funding Plan
Note:
$ 112 M
Shortall
Based on April 2021 Appraisal, LATIP Program is $ 86 million (New Special State STIP Account) LATIP funding for QLP & Decoto Complete Streets is now approx. $ 60 million (not 32.8 million) City Council/RSA Agenda 200 Tuesday, January 11, 2022
15 PHASE 1: 7TH STREET CONNECTION
(Mission Blvd to 7th Street)
➢ Construct 4 lanes street with
separate Class I trail, buffer bike
lanes and landscaping
➢ Realign 7th Street along Corp Yard &
connects to Chesapeake
➢ Install and modify Utilities
➢ Modify & Realign the Line M Box &
Open Channel
➢ Construct a new parking lot
➢ Supports Station East (Integral)
Mixed-Used Development
Phase 1 Project Cost: $ 16.7 Million
City Council/RSA Agenda 201 Tuesday, January 11, 2022
16 PHASE 2- GATEWAY CONNECTION (GATEWAY SITE)
(Old Alameda Creek to Alvarado-Niles Road)
➢ Construct 4 lanes street with
separate Class I, buffer bike
lanes and landscaping
➢ Construct storm water detention
system
➢ Realign existing Quarry Lake
Drive between new QLP and
Isherwood next to creek
➢ Install and modify utilities
➢ Install new traffic signal and
streel lighting
➢ Coordinate with City Ventures
Residential Development
Phase 2 Project Cost: $ 20.3 Million
City Council/RSA Agenda 202 Tuesday, January 11, 2022
17 DESIGN RFP: QUARRY LAKES PARKWAY, PHASES 1 & 2
Scope of Services: Initial Design Phase (Appendix A)
1) Evaluate the 2011 East West Connector Plans, EWC EIR and technical and engineering reports
2) Identify and document design updates and innovative solutions through Pre-Design Process (PDR) with recommendation
3) Update Engineering Reports
4) Right of Way and Surveys
5) Prepare 30% Level Plans
Initial Fee - $ 1,000,000 (1986 Measure B funds)
City Council/RSA Agenda 203 Tuesday, January 11, 2022
18 DESIGN RFP: QUARRY LAKES PARKWAY, PHASES 1 & 2
Proposal Requirement
1) Profile of Firm
2) Qualification of Key Staff- PM, Deputy PM, other key staff 3) Relevant Experience and Projects
4) Work Plan/Project Understanding/Technical Approach
5) Project Staffing/Hours
6) Local Firm Preference
City Council/RSA Agenda 204 Tuesday, January 11, 2022
19 DESIGN RFP: QUARRY LAKES PARKWAY, PHASES 1 & 2

KEY RFP DATES
October 19, 2021 - Issued RFP
Nov. 2, 2021 at 10:00 am - Pre-Proposal & Meet the Prime Event Nov. 9, 2021 at 5:00 p.m. - Deadline to Submit Questions Nov. 10, 2021 - Issue Addendum
(Sent to list and posted to City website)
Nov. 23, 2021 by 1:30 p.m. - Deadline to Submit Proposal Dec. 14-17, 2021 – Firm Interviews
City Council/RSA Agenda 205 Tuesday, January 11, 2022
20 DESIGN RFP: QUARRY LAKES PARKWAY (QLP), PHASES 1 & 2 Questions…
City Council/RSA Agenda 206 Tuesday, January 11, 2022
21 DESIGN RFP: QUARRY LAKES PARKWAY, PHASES 1 & 2
Measure B/BB Funding Requirements
Revised Scoring Criteria

ALAMEDA CTC LBCE PROGRAM
Project Manager and Key Staff’s Relevant Experience 30 Points Technical Approach to the Project 40 Points
Resource Plan for Project (hours by staff and tasks) 20 Points Achieve Alameda CTC LBE Goal of 70% 5 Points
Achieve Alameda CTC SLBE Goal of 30% 5 Points
Total = 100 Points
City Council/RSA Agenda 207 Tuesday, January 11, 2022
Tier Budget LBE SLBE VSLBE Certification Status LBE SLBE VSLBE Prime $100,000 $100,000 - -
Alameda CTC LBE
exp. YYYY-MM-DD x
Tier 1 $10,000 $10,000 $10,000 -
Alameda CTC LBE, SLBE
exp. YYYY-MM-DD x x
Tier 2 under
Subconsultant Name $5,000 $5,000 $5,000 $5,000
Alameda CTC LBE, SLBE,
VSLBE
exp. YYYY-MM-DD x x x
E.g.:

Tier 1 $59,000 $59,000 $59,000 -
Alameda CTC LBE, SLBE
exp. YYYY-MM-DD x x
E.g.:

Tier 2 under Aerial Maps,
Inc. $1,000 - - - None
E.g.:

Tier 2 under Aerial Maps,
Inc. $500 $500 - -
Alameda CTC LBE
exp. YYYY-MM-DD x
TOTAL NONCONTINGENCY $175,500 $174,500 $74,000 $5,000
GOAL ACHIEVEMENT 99.4% 42.2% 2.8%
$0 $0 $0 $0
$0 $0 $0 $0
TOTAL NONCONTINGENCY $0 $0 $0 $0
GOAL ACHIEVEMENT #DIV/0! #DIV/0! #DIV/0!
CtPlFB2020
Form B (LBCE sheet)
City Council/RSA Agenda 208 Tuesday, January 11, 2022
23 DESIGN RFP: QUARRY LAKES PARKWAY, PHASES 1 & 2
Alameda CTC LBCE Requirements
• No substitution of a listed LBE, SLBE, or VSLBE subconsultant on a contract can be made without the prior written approval of City with agreement of ALAMEDA CTC. • CONSULTANT agrees that within ten (10) calendar days’ receipt of payment from Sponsor Agency, CONSULTANT shall pay to its subconsultants all amounts due from such payment for satisfactory performance of its contract, subject to such legal requirements under federal or state law regarding withholding of disputed payments and applicable penalties. • CONSULTANT agrees to include any subconsultant’s acceptable invoices with each Payment Request Form that it submits to Sponsor Agency no later than thirty (30) calendar days after receipt of such invoice from the subconsultant. This clause applies to LBE, SLBE, and VSLBE and non- LBE, SLBE, and VSLBE subconsultants.
• CONSULTANT agrees further to release retainage payments, if any, to each subconsultant within thirty (30) calendar days after the subconsultant’s work is completed and accepted. Any delay or postponement of payment over thirty (30) days may take place only for good cause and with ALAMEDA CTC’s prior written approval.

City Council/RSA Agenda 209 Tuesday, January 11, 2022
24 DESIGN RFP: QUARRY LAKES PARKWAY, PHASES 1 & 2
Alameda CTC LBCE Requirements
• Firms must be certified at time of proposal submission and proof of certification. • NOT the same as the County of Alameda or the City of Alameda Certification.

If you wish to be certified, please see us after the event for additional information on getting certified.

See Alameda CTC website for details on certification requirements and current list of certified firms.

Local Business Contract Equity Program - Alameda CTC
Certification Team
510.208.7460
[email protected]
City Council/RSA Agenda 210 Tuesday, January 11, 2022
25 DESIGN RFP: QUARRY LAKES PARKWAY (QLP), PHASES 1 & 2 Questions…
City Council/RSA Agenda 211 Tuesday, January 11, 2022
26 DESIGN RFP: QUARRY LAKES PARKWAY (QLP), PHASES 1 & 2 “MEET THE PRIMES” NETWORKING EVENT
1) PRIMES TABLES
2) MEET Subconsultants
3) MINGLE
City Council/RSA Agenda 212 Tuesday, January 11, 2022
Pre-Proposal Conference for the Final Design Services for Quarry Lakes Parkway Project (Phases 1 and 2) City of Union City
City Project 18-04
November 2, 2021
10:00 am
Studio 11
Attendees Prime/subLast Name First Name Firm Role Specialty LBE SLBE VSLBE 1 Prime 1 Mercurio Etty AECOM Technical Services, Inc. Prime Muncipal/transportation X 2 Prime 1 Ho Daniel AECOM Technical Services, Inc. Prime Muncipal/transportation X 3 Prime 2 Bernardi Natalina BKF Engineers Prime Muncipal/transportation X 4 Prime 2 Sweet Gordon BKF Engineers Prime Muncipal/transportation X 5 Prime 3 Ahmed Hatem CSG Consultants Prime Muncipal/transportation X 6 Prime 3 Williams Hal CSG Consultants Prime Muncipal/transportation X 7 Prime 4 Marco Trisha Mark Thomas Prime Muncipal/transportation X 8 Prime 4 O'Keefe Shawn Mark Thomas Prime Muncipal/transportation X 9 Prime 4 Childs Cheryl Mark Thomas Prime Muncipal/transportation X 10 Sub 1 Ochoa Analette HDR|WRECO Subconsultant Drainage/hydrology X 11 Sub 1 Low Garrett HDR|WRECO Subconsultant No longeer SLBE - drainage X 12 Sub 2 Rikkelman Anna BSK Prime?, maybe sub Environmental, geotech, testing X 13 Sub 3 Wang Frank PARIKH Consultants, Inc Subconsultant Geotechnical X 14 Sub 3 Parikh Gary PARIKH Consultants, Inc Subconsultant Geotechnical X 15 Sub 4 Naster Katie JMA Civil, Inc. Subconsultant General civil and rail X 16 Sub 5 Park Jaemin Park Engineering, Inc. Subconsultant Construction X 17 Sub 6 Alexander Jeriann Fugro Subconsultant Hazardous Materials X 18 TBD Vice Darrell Jacobs TBD Interested in Phases 3 & 4 X 19 Sub 5 Silva Tony HMH Subconsultant General civil and Surveys 20 Sub 6 Lee Spender
Y & C Transportation
Consultants, Inc. Subconsultant Electrical/Traffic Signals X City Council/RSA Agenda 213 Tuesday, January 11, 2022
RESOLUTION NO.

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF UNION CITY

AUTHORIZING THE CITY MANAGER TO EXECUTE A CONSULTING SERVICES AGREEMENT WITH MARK THOMAS & COMPANY, INC. FOR THE
PRELIMINARY ENGINEERING (30% DESIGN) OF PHASES (SEGMENTS) 1 AND 2

FOR QUARRY LAKES PARKWAY (EAST WEST CONNECTOR),
CITY PROJECT NO. 18-04, IN THE AMOUNT OF $1,200,000
WHEREAS, the Alameda County Transportation Commission (Alameda CTC) approved the request from the City of Union City to be the project sponsor for the remaining phases of the I-880 to Mission Boulevard/East West Connector Project and to update the project description eligible for the remaining commitment from the 1986 Measure B Transportation Expenditure Plan to reflect the Quarry Lakes Parkway Project; and WHEREAS, on February 12, 2019, the City Council adopted Resolution No. 5444-19, which authorized renaming the I-880 to Mission Boulevard/East West Connector Project to the Quarry Lakes Parkway Project; and
WHEREAS, the City Council has identified in the Strategic Plan Goal C, Strategy 3:

Facilitate the build-out of the greater Station District Area through the construction of the Quarry Lakes Parkway, upgrades to the BART Station, completion of the pedestrian rail crossing and the sale and development of City-owned land; and
WHEREAS, the Project consists of Quarry Lakes Parkway (QLP) in Union City and Decoto Road Compete Streets Project in Fremont, which will be implemented by the City of Fremont; and
WHEREAS, QLP in Union City consists of Phase 1: 7
th Street Connection, Phase 2:

Gateway Connection, Phase 3: 11th Street Connection and Phase 4: Grade Separations and Alvarado-Niles Connection. Phase 5: Paseo Padre and Trail Connection is in both the cities of Union City and Fremont; and
WHEREAS, the remaining commitment of 1986 Measure B funding available for the QLP is approximately $69 Million; and
WHEREAS, the current cost estimate for the QLP and Decoto Road Complete Streets is approximately $288 Million and the cost estimate of QLP Phases 1-4 is approximately $208 Million; and
WHEREAS, on November 19, 2020, the Alameda CTC adopted Resolution No. 20-013 that included approval for the use of 1986 Measure B and 2014 Measure BB funding on individual sub-projects or project phases of the QLP, which are fully funded; and City Council/RSA Agenda 214 Tuesday, January 11, 2022
WHEREAS, on March 9, 2021, the City Council adopted Resolution Nos. 5720-21 and 5721-21 authorizing commitments of Measure BB TEP 21, Dumbarton Corridor Improvement funds of $40.0 Million and TEP 22, Union City Intermodal District funds of $72.0 Million to Quarry Lakes Parkway Project for Phases 3 and Phase 4; and WHEREAS, on June 24, 2021, the California Transportation Commission (CTC) approved the conveyance of excess Caltrans parcels (originally reserved for Route 84) appraised at $86.0 Million to the City of Union City and the City is now responsible to select a residential developer; and
WHEREAS, the $86.0 Million from the sale of the Caltrans parcels for residential development will fund the Local Agency Transportation Improvement Program (LATIP) with estimated LATIP obligations of about $60.0 Million to Quarry Lakes Parkway and Decoto Road Complete Streets; and
WHEREAS, on September 7, 2021, Union City received a $4.2 Million grant in 1986 Measure B funds in the executed Alameda CTC Project Funding Agreement No. A22-0053 to fund the cost of Final Design Services of Phases (Segments) 1 and 2 for Quarry Lakes Parkway (East West Connector), City Project No. 18-04; and
WHEREAS, on October 12, 2021, City Council adopted Resolution No. 5842-21 approving acceptance of the $4.2 Million grant and increasing the FY 2021/22 revenue projection in Account Number 4100-91804-44502 (Capital Projects Fund – Misc. County/Local Grants) by $4.2 Million for Quarry Lakes Parkway (East West Connector) Project, City Project No. 18-04; and
WHEREAS, on October 12, 2021, City Council also approved an amendment to the FY 2021/22 Capital Projects Fund budget by appropriating $4.2 Million to Account Number 4100- 3199-91804-54110 (Capital Projects Fund - Quarry Lakes Parkway (East West Connector) Project - Professional Services) for Final Design Services of Phases (Segments) 1 and 2 for the Quarry Lakes Parkway (East West Connector) Project, City Project No. 18-04; and WHEREAS, on October 14, 2021, a notification that the upcoming Request for Proposal (RFP) for Preliminary Engineering (30% Design) of Phases 1 and 2 for Quarry Lakes Parkway, City Project No. 18-04, would be available on city’s website on October 19, 2021 was emailed to all potential Prime Consultant and Subconsultant firms on the Alameda CTC’s Certified Firms List dated October 1, 2021; and
WHEREAS, on November 9, 2021, a Pre-Proposal Meeting and “Meet the Primes” event was held at Studio 11 for interested Prime Consultant and Subconsultant firms with about twenty (20) attendees, including four (4) potential Prime Consultant firms; and WHEREAS, on November 23, 2021, the City received one (1) proposal for the Preliminary Engineering (30% Design) of Phases 1 and 2 for Quarry Lakes Parkway, City Project No. 18-04, from Mark Thomas & Company, Inc. of Oakland, CA; and City Council/RSA Agenda 215 Tuesday, January 11, 2022
WHEREAS, on December 9, 2021, a Consultant Presentation and Interactive Technical Interview was held at Studio 11 with the Mark Thomas team and the Evaluation Panel consisting of city staff representing the City Manager’s Office, the Community and Economic Development Department, the Public Works Department, and Union City Transit, as well as a Bicycle and Pedestrian Advisory Committee (BPAC) member and a potential developer; and WHEREAS, the Evaluation Panel determined that Mark Thomas and their subconsultant team presented a well-organized, technical presentation and provided highly qualified responses to engineering issues related to Complete Streets design, roadway drainage, hydrology, hydromodification, water quality, understanding of utilities within Public Right of Way and coordination with adjacent developments and unanimously made the recommendation to select Mark Thomas & Company, Inc. for the project; and
WHEREAS, the initial Scope of Services identified in the RFP is for Preliminary Engineering (30% Design) to allow the selected Consultant team the opportunity to provide a detailed, extensive review of outdated 2011 East West Connector Project Plans (65%) including CAD drawing files, engineering calculations and technical reports to recommend how to update the Project Plans to current design standards and technical reports using the most current engineering criteria and policies. Once this task is completed, the selected Consultant team will have a better understanding of the complexities of the project and will be able to prepare a fair, detailed Scope of Services and Cost Proposal to complete Final Design; and WHEREAS, the initial Scope of Services for Preliminary Engineering (30% Design), in the amount $1,200,000, will be funded from the $4.2 Million grant appropriated to the Capital Project Fund (Account Number 4100-3199-91804-54110) for Phases 1 and 2 of Quarry Lakes Parkway, City Project No. 18-04, with the remaining $3.0 Million being reserved for completion of the Final Design; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Union City hereby authorizes the City Manager to execute a Consulting Services Agreement with Mark Thomas & Company, Inc. for Preliminary Engineering (30% Design) of Phases (Segments) 1 and 2 for the Quarry Lakes Parkway (East West Connector) Project, City Project No. 18-04, in the amount of $1,200,000 (Exhibit A).

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Union City at a regular meeting held on the 11
th day of January 2022, by the following vote:

City Council/RSA Agenda 216 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 1 of 15

CONSULTING SERVICES AGREEMENT BETWEEN

THE CITY OF UNION CITY
AND
MARK THOMAS & COMPANY, INC.

FOR FINAL DESIGN OF PHASES 1 & 2 FOR
QUARRY LAKES PARKWAY, CITY PROJECT NO. 18-04
This Agreement for consulting services is made by and between the City of Union City, a municipal corporation, (“City”) and Mark Thomas & Company, Inc._, a California corporation, with offices located at 456 8th Street, Suite 200B, Oakland, CA 94607, (“Consultant”), (together referred to as the “Parties”) as of January 3, 2022 (the “Effective Date”).

Section 1. Services. Subject to the terms and conditions set forth in this Agreement, Consultant shall provide to City the services described in the Scope of Work attached as Exhibit A and incorporated herein, at the time and place and in the manner specified therein. In the event of a conflict in or inconsistency between the terms of this Agreement and Exhibit A, the Agreement shall prevail.

1.1 Term of Services. The term of this Agreement shall begin on the Effective Date and shall end on December 31, 2023, and Consultant shall complete the work described in Exhibit A on or before that date, unless the term of the Agreement is otherwise terminated or extended, as provided for in Section 8. The time provided to Consultant to complete the services required by this Agreement shall not affect the City’s right to terminate the Agreement, as referenced in Section 8.

1.2 Standard of Performance. Consultant shall perform all services required pursuant to this Agreement according to the standards observed by a competent practitioner of the profession in which Consultant is engaged.

1.3 Assignment of Personnel. Consultant shall assign only competent personnel to perform services pursuant to this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the reassignment of any such persons, Consultant shall, immediately upon receiving notice from City of such desire of City, reassign such person or persons.

1.4 Time is of the Essence. Time is of the essence. Consultant shall devote such time to the performance of services pursuant to this Agreement as may be reasonably necessary to timely finish the Scope of Work, to meet the standard of performance provided in Section 1.1 above and to satisfy Consultant’s obligations hereunder.

1.5 Public Works Requirements. Because the services described in Exhibit A include “work performed during the design and preconstruction phases of construction including, but not limited to, inspection and land surveying work,” the services constitute a public works within the definition of Section 1720(a)(1) of the California Labor Code. As a result, Consultant is required to comply with the provisions of the Labor Code applicable to public works, to the extent set forth in Exhibit C. Consultant shall waive, indemnify, hold harmless, and defend City concerning any liability arising out of Labor Code Section 1720 et seq.

City Council/RSA Agenda 217 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 2 of 15 Section 2. COMPENSATION. The compensation for this agreement is a “specific rate of compensation” not to exceed maximum dollar amount. City hereby agrees to pay Consultant a sum not to exceed One Million Two Hundred Thousand Dollars_, ($_1,200,000.00_) notwithstanding any contrary indications that may be contained in Consultant’s proposal for services to be performed and reimbursable costs incurred under this Agreement. In the event of a conflict between this Agreement and Consultant’s proposal, attached as Exhibit A, regarding the amount of compensation, the Agreement shall prevail. City shall pay Consultant for services rendered pursuant to this Agreement at the time and in the manner set forth herein. The payments specified below shall be the only payments from City to Consultant for services rendered pursuant to this Agreement. Consultant shall submit all invoices to City in the manner specified herein. Except as specifically authorized by City in writing, Consultant shall not bill City for duplicate services performed by more than one person.

This agreement in the amount of $1,200,000 is provide engineering services to prepare a 30% Completion Design Level Services (“Services”) which includes the Pre-Design Report (PDR) process for issue resolution and documentation. Upon completion of the 30% Level Engineering, City reserves the right to negotiate and amend this agreement for the final design services and design support during construction.

Consultant and City acknowledge and agree that compensation paid by City to Consultant under this Agreement is based upon Consultant’s estimated costs of providing the services required hereunder, including salaries and benefits of employees and subcontractors of Consultant. Consequently, the parties further agree that compensation hereunder is intended to include the costs of contributions to any pensions and/or annuities to which Consultant and its employees, agents, and subcontractors may be eligible. City therefore has no responsibility for such contributions beyond compensation required under this Agreement.

2.1 Invoices. Consultant shall submit invoices, not more often than once a month during the term of this Agreement, based on the cost for services performed and reimbursable costs incurred prior to the invoice date. Invoices shall contain the following information:
• Serial identifications of progress bills; i.e., Progress Bill No. 1 for the first invoice, etc.;
• Project name & number;
• Purchase Order number to expedite payment;
• The beginning and ending dates of the billing period; • A task summary containing the original contract amount, the amount of prior billings, the total due this period, the balance available under the Agreement, and the percentage of completion;
• At City’s option, for each work item in each task, a copy of the applicable time entries or time sheets shall be submitted showing the name of the person doing the City Council/RSA Agenda 218 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 3 of 15 work, the hours spent by each person, a brief description of the work, and each reimbursable expense;
• A detailed invoice showing the total number of hours of work breakdown by tasks at a specific rate schedule per Exhibit B and associated costs performed under the Agreement by Consultant and each employee, agent, and subcontractor of Consultant performing services hereunder;
• The Consultant’s signature;

2.2 Monthly Payment. City shall make monthly payments, based on invoices received, for services satisfactorily performed, and for authorized reimbursable costs incurred. City shall have 30 days from the receipt of an invoice that complies with all of the requirements above to pay Consultant.

2.3 Final Payment. City shall pay the last 10% of the total sum due pursuant to this Agreement within 60 days after completion of the services and submittal to City of a final invoice, if all services required have been satisfactorily performed.

2.4 Total Payment. City shall pay for the services to be rendered by Consultant pursuant to this Agreement. City shall not pay any additional sum for any expense or cost whatsoever incurred by Consultant in rendering services pursuant to this Agreement. City shall make no payment for any extra, further, or additional service pursuant to this Agreement.

In no event shall Consultant submit any invoice for an amount in excess of the maximum amount of compensation provided above either for a task or for the entire Agreement, unless the Agreement is modified prior to the submission of such an invoice by a properly executed change order or amendment.

2.5 Hourly Rate/Fees. Unless the services provided are for a lump sum or flat fee, fees for work performed by Consultant on an hourly basis shall not exceed the amounts shown on the compensation cost proposal attached hereto as Exhibit B. In the event of a conflict in or inconsistency between the terms of this Agreement and Exhibit B, the Agreement shall prevail.

2.6 Reimbursable Expenses. Reimbursable expenses are specified in Exhibit C, attached hereto and incorporated herein. Reimbursable expenses not listed in Exhibit C are not chargeable to City. Reimbursable expenses shall not include a mark-up and are billed as a direct costs. In no event shall expenses be advanced by the City to the Consultant. Reimbursable expenses are included in the total amount of compensation provided under this Agreement that shall not be exceeded.

2.7 Payment of Taxes. Consultant is solely responsible for the payment of employment taxes incurred under this Agreement and any similar federal or state taxes.

2.8 Payment upon Termination. In the event that the City or Consultant terminates this Agreement pursuant to Section 8, the City shall compensate the Consultant for all outstanding costs and reimbursable expenses incurred for work satisfactorily completed as of the date of written notice City Council/RSA Agenda 219 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 4 of 15 of termination. Consultant shall maintain adequate logs and timesheets to verify costs incurred to that date. Additional costs may be incurred after the date of written termination in order to package up files and complete other pertinent project close-out procedures.

2.9 Authorization to Perform Services. The Consultant is not authorized to perform any services or incur any costs whatsoever under the terms of this Agreement until receipt of authorization from the Contract Administrator.

2.10. Business License. The Consultant is not authorized to perform services or incur costs whatsoever under the terms of this Agreement until Consultant applies for and has been issued a business license from the City pursuant to Title 5 of the Union City Municipal Code.

Section 3. FACILITIES AND EQUIPMENT. Except as set forth herein, Consultant shall, at its sole cost and expense, provide all facilities and equipment that may be necessary to perform the services required by this Agreement. City shall make available to Consultant only the facilities and equipment listed in this section, and only under the terms and conditions set forth herein.

City shall furnish physical facilities such as desks, filing cabinets, and conference space, as may be reasonably necessary for Consultant’s use while consulting with City employees and reviewing records and the information in possession of the City. The location, quantity, and time of furnishing those facilities shall be in the sole discretion of City. In no event shall City be obligated to furnish any facility that may involve incurring any direct expense, including but not limited to computer, long-distance telephone or other communication charges, vehicles, and reproduction facilities.

Section 4. INSURANCE REQUIREMENTS. Before beginning any work under this Agreement, Consultant, at its own cost and expense, unless otherwise specified below, shall procure the types and amounts of insurance listed below against claims for injuries to persons or damages to property that may arise from or in connection with the performance of the work hereunder by the Consultant and its agents, representatives, employees, and subcontractors. Consistent with the following provisions, Consultant shall provide proof satisfactory to City of such insurance that meets the requirements of this section and under forms of insurance satisfactory in all respects, and that such insurance is in effect prior to beginning work to the City. Consultant shall maintain the insurance policies required by this section throughout the term of this Agreement. The cost of such insurance shall be included in the Consultant's bid. Consultant shall not allow any subcontractor to commence work on any subcontract until Consultant has obtained all insurance required herein for the subcontractor(s) and provided evidence that such insurance is in effect to City. Verification of the required insurance shall be submitted and made part of this Agreement prior to execution.

4.1 Required Coverage. Consultant shall maintain all required insurance listed herein for the duration of this Agreement.

COVERAGE TYPE OF INSURANCE MINIMUM LIMITS
A Commercial General Liability
Premises Liability; Products
and Completed Operations;
Contractual Liability; Personal
$1,000,000 per occurrence;
Bodily Injury and Property
Damage
$2,000,00 in the aggregate;
City Council/RSA Agenda 220 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 5 of 15 Injury and Advertising Liability Commercial general coverage shall be at least as broad as
Insurance Services Office
Commercial General Liability
occurrence form CG 0001
(most recent edition) covering
comprehensive General
Liability on an “occurrence”
basis
B Commercial or Business
Automobile Liability
All owned vehicles, hired or
leased vehicles, non-owned,
borrowed and permissive uses.

Personal Automobile Liability
is acceptable for individual
contractors with no
transportation or hauling related
activities
$2,000,000 per occurrence;
Any Auto; Bodily Injury and
Property Damage. Automobile
coverage shall be at least as
broad as Insurance Services
Office Automobile Liability
form CA 0001 (most recent
edition), Code 1 (any auto). No
endorsement shall be attached
limiting the coverage.

C Workers’ Compensation
(WC) and Employers
Liability (EL)
Required for all contractors
with employees
WC: Statutory Limits
EL: $100,000 per accident for
bodily injury or disease.

Consultant may rely on a selfinsurance program to meet those requirements, but only if
the program of self-insurance
complies fully with the
provisions of the California
Labor Code. The insurer shall
waive all rights of subrogation
against the City and its officers,
officials, employees, and
volunteers for loss arising from
work performed under this
Agreement
D Professional Liability/Errors
& Omissions
Includes endorsements of
contractual liability
$5,000,000 per occurrence
$5,000,000 policy aggregate;
Any deductible or self-insured
retention shall not exceed
$200,000 per claim

4.2 Additional requirements. Each of the following shall be included in the insurance coverage or added as a certified endorsement to the policy:

City Council/RSA Agenda 221 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 6 of 15 a. All required insurance shall be maintained during the entire term of the Agreement with the following exception: Insurance policies and coverage(s) written on a claims-made basis shall be maintained during the entire term of the Agreement and until three (3) years following termination and acceptance of all work provided under the Agreement, with the retroactive date of said insurance (as may be applicable) concurrent with the commencement of activities pursuant to this Agreement b. All insurance required above with the exception of Professional Liability, Personal Automobile Liability, Workers’ Compensation and Employers Liability, shall be endorsed to name as additional insured: City of Union City, its City Council, and all City officers, employees, volunteers.
c. For any claims related to this Agreement or the work hereunder, the Consultant’s insurance covered shall be primary insurance as respects the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Consultant’s insurance and shall not contribute with it.
d. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled by either party, except after 30 days’ prior written notice has been provided to the City.
e. Certificates of Insurance: Before commencing operations under this Agreement, Consultant shall provide Certificate(s) of Insurance and applicable insurance endorsements, in form and satisfactory to City, evidencing that all required insurance coverage is in effect. The City reserves the rights to require the Consultant to provide complete, certified copies of all required insurance policies.
f. Subcontractors: Consultant shall include all subcontractors as an insured (covered party) under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein.
g. Claims-made limitations. The following provisions shall apply if the professional liability coverage is written on a claims-made form:
i. The retroactive date of the policy must be shown and must be before the date of the Agreement.
ii. Insurance must be maintained and evidence of insurance must be provided for at least five years after completion of the Agreement or the work, so long as commercially available at reasonable rates.
iii. If coverage is canceled or not renewed and it is not replaced with another claims-made policy form with a retroactive date that precedes the date of this Agreement, Consultant must purchase an extended period coverage for a minimum of three (3) years after completion of work under this Agreement.

City Council/RSA Agenda 222 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 7 of 15 iv. A copy of the claim reporting requirements must be submitted to the City for review prior to the commencement of any work under this Agreement.

4.3 All Policies Requirements.
a. Acceptability of insurers. All insurance required by this section is to be placed with insurers with a Bests' rating of no less than A:VII. Insurance shall be maintained through an insurer with a minimum A.M. Best Rating of A- or better, with deductible amounts acceptable to the City. Acceptance of Consultant’s insurance by City shall not relieve or decrease the liability of Consultant hereunder. Any deductible or self-insured retention amount or other similar obligation under the policies shall be the sole responsibility of the Consultant. b. Deductibles and Self-Insured Retentions. Consultant shall disclose to and obtain the written approval of City for the self-insured retentions and deductibles before beginning any of the services or work called for by any term of this Agreement. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, employees, and volunteers; or the Consultant shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration and defense expenses.
c. Wasting Policies. No policy required by this Section 4 shall include a “wasting” policy limit (i.e. limit that is eroded by the cost of defense). d. Waiver of Subrogation. Consultant hereby agrees to waive subrogation which any insurer or contractor may require from vendor by virtue of the payment of any loss.

Consultant agrees to obtain any endorsements that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the entity for all work performed by the consultant, its employees, and subcontractors.

4.4 Remedies. In addition to any other remedies City may have if Consultant fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option exercise any of the following remedies, which are alternatives to other remedies City may have and are not the exclusive remedy for Consultant’s breach:
• Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under the Agreement;
• Order Consultant to stop work under this Agreement or withhold any payment that becomes due to Consultant hereunder, or both stop work and withhold any payment, until Consultant demonstrates compliance with the requirements hereof; and/or • Terminate this Agreement.

City Council/RSA Agenda 223 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 8 of 15 Section 5. INDEMNIFICATION AND CONSULTANT’S RESPONSIBILITIES.

A) Consultant shall, to the extent permitted by law, indemnify, hold harmless and assume the defense of, in any actions at law or in equity, the City, its employees, agents, volunteers, and elective and appointive boards, from all claims, losses, and damages (excluding claims arising from a professional error or omission), including property damage, personal injury, death, and liability of every kind, nature and description, arising out of, pertaining to or related to the negligence, recklessness or willful misconduct of Consultant or any person directly or indirectly employed by, or acting as agent for, Consultant, during and after completion of Consultant’s work under this Agreement.

B) With respect to those claims arising from a professional error or omission, Consultant shall defend, indemnify and hold harmless the City (including its elected officials, officers, employees, and volunteers) from all claims, losses, and damages to the extent caused by the professionally negligent acts, errors or omissions of Consultant. Consultant has no obligation to pay for any of City Indemnitees defense related cost prior to a final determination of liability by either a Court of law or third party neutral, or to pay any amount that exceeds Consultant’s finally determined percentage of liability based upon the comparative fault of Consultant, except as provided in Civil Code Section 2782.8(a) and (e).

C) Consultant's obligation under this section does not extend to that portion of a claim caused in whole or in part by the active negligence or willful misconduct of the City.

D) Consultant shall also indemnify, defend and hold harmless the City from all suits or claims for infringement of any patent rights, copyrights, trade secrets, trade names, trademarks, service marks, or any other proprietary rights of any person or persons because of the City or any of its officers, employees, volunteers, or agents use of articles, products things, or services supplied in the performance of Consultant’s services under this Agreement.

E) Notwithstanding the forgoing, to the extent this Agreement is a “construction contract” as defined by California Civil Code Section 2782, as may be amended from time to time, such duties of consultant to indemnify shall not apply when to do so would be prohibited by California Civil Code Section 2782.

F) In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.

City Council/RSA Agenda 224 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 9 of 15 Section 6. STATUS OF CONSULTANT.

6.1 Independent Contractor. At all times during the term of this Agreement, Consultant shall be an independent contractor and shall not be an employee of City. City shall have the right to control Consultant only insofar as the results of Consultant's services rendered pursuant to this Agreement and assignment of personnel pursuant to Subparagraph 1.3; however, otherwise City shall not have the right to control the means by which Consultant accomplishes services rendered pursuant to this Agreement. Notwithstanding any other City, state, or federal policy, rule, regulation, law, or ordinance to the contrary, Consultant and any of its employees, agents, and subcontractors providing services under this Agreement shall not qualify for or become entitled to, and hereby agree to waive any and all claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in the California Public Employees Retirement System (PERS) as an employee of City and entitlement to any contribution to be paid by City for employer contributions and/or employee contributions for PERS benefits.

6.2 Consultant Not an Agent. Except as City may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent.

Consultant shall have no authority, express or implied, pursuant to this Agreement to bind City to any obligation whatsoever.

Section 7. LEGAL REQUIREMENTS.

7.1 Governing Law. The laws of the State of California shall govern this Agreement.

7.2 Compliance with Applicable Laws. Consultant and any subcontractors shall comply with all laws applicable to the performance of the work hereunder.

7.3 Other Governmental Regulations. To the extent that this Agreement may be funded by fiscal assistance from another governmental entity, Consultant and any subcontractors shall comply with all applicable rules and regulations to which City is bound by the terms of such fiscal assistance program. Specifically, the requirements of the Alameda CTC are as follows:

ALAMEDA CTC Local Business Contract Equity Program

1. Consultant shall comply with all applicable provisions of Alameda County Transportation Commission’s (ALAMEDA CTC’s) Local Business Contract Equity (LBCE) Program, incorporated herein by reference as if attached hereto. City shall provide a copy of the LBCE PROGRAM to Consultant upon request.

2. If the Consultant or any subconsultant is a Local Business Enterprise (“LBE”), Small Local Business Enterprise (“SLBE”), and/or Very Small Local Business Enterprise (“VSLBE”) firm, the certificate for that firm shall be attached to this AGREEMENT.

3. No substitution of a listed LBE, SLBE, or VSLBE subconsultant on a contract can be made without the prior written approval of City with agreement of ALAMEDA CTC. If an LBE, City Council/RSA Agenda 225 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 10 of 15 SLBE, or VSLBE subconsultant is unable to perform successfully, the City or Consultant shall submit a written request to ALAMEDA CTC for approval to replace such firm.

Consultant must make good faith efforts to replace such LBE, SLBE, or VSLBE with another LBE, SLBE, or VSLBE, respectively. ALAMEDA CTC may investigate the circumstances surrounding the substitution request.

4. Consultant agrees that within ten (10) calendar days’ receipt of payment from City, Consultant shall pay to its subconsultants all amounts due from such payment for satisfactory performance of its contract, subject to such legal requirements under federal or state law regarding withholding of disputed payments and applicable penalties. Any delay or postponement of payment over thirty (30) days may take place only for good cause and with ALAMEDA CTC’s prior written approval. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies, otherwise available to the Consultant or subconsultant in the event of a dispute involving late payment or nonpayment by the Consultant, deficient subconsultant performance, and/or noncompliance by a subconsultant. This clause applies to LBE, SLBE, and VSLBE and non- LBE, SLBE, and VSLBE subconsultants.

5. Consultant agrees to include any subconsultant’s acceptable invoices with each Payment Request Form that it submits to Sponsor Agency no later than thirty (30) calendar days after receipt of such invoice from the subconsultant. This clause applies to LBE, SLBE, and VSLBE and non- LBE, SLBE, and VSLBE subconsultants. \

6. Consultant agrees further to release retainage payments, if any, to each subconsultant within thirty (30) calendar days after the subconsultant’s work is completed and accepted. Any delay or postponement of payment over thirty (30) days may take place only for good cause and with ALAMEDA CTC’s prior written approval. This clause applies to Prime Consultant.

7.4 Licenses and Permits. Consultant represents and warrants to City that Consultant and its employees, agents, and any subcontractors have all licenses, permits, qualifications, and approvals of whatsoever nature that are legally required to practice their respective professions.

Consultant represents and warrants to City that Consultant and its employees, agents, any subcontractors shall, at their sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals that are legally required to practice their respective professions. In addition to the foregoing, Consultant and any subcontractors shall obtain and maintain during the term of this Agreement valid Business Licenses from City.

7.5 Nondiscrimination and Equal Opportunity. Consultant shall not discriminate, on the basis of a person’s race, religion, color, national origin, age, physical or mental handicap or disability, medical condition, marital status, sex, or sexual orientation, against any employee, applicant for employment, subcontractor, bidder for a subcontract, or participant in, recipient of, or City Council/RSA Agenda 226 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 11 of 15 applicant for any services or programs provided by Consultant under this Agreement. Consultant shall comply with all applicable federal, state, and local laws, policies, rules, and requirements related to equal opportunity and nondiscrimination in employment, contracting, and the provision of any services that are the subject of this Agreement, including but not limited to the satisfaction of any positive obligations required of Consultant thereby.

Consultant shall include the provisions of this Subsection in any subcontract approved by the Contract Administrator or this Agreement.

Section 8. TERMINATION AND MODIFICATION.

8.1 Termination. City, or Consultant, may cancel this Agreement at any time and without cause upon written notification to Consultant. Consultant may cancel this Agreement upon thirty (30) days’ written notice to City and shall include in such notice the reasons for cancellation.

In the event of termination, Consultant shall be entitled to compensation for services performed to the effective date of termination; Additional costs may be incurred after the date of written termination in order to package up and complete other pertinent project closeout procedures. City, however, may condition payment of such compensation upon Consultant delivering to City any or all work product, including, but not limited to documents, photographs, computer software, video and audio tapes, and other materials provided to Consultant or prepared by or for Consultant or the City in connection with this Agreement.

8.2 Extension. City may, in its sole and exclusive discretion, extend the end date of this Agreement beyond that provided for in Subsection 1.1. Any such extension shall require a written amendment to this Agreement, as provided for herein.

8.3 Amendments. The parties may amend this Agreement only by a writing signed by all the parties.

8.4 Assignment and Subcontracting. City and Consultant recognize and agree that this Agreement contemplates personal performance by Consultant and is based upon a determination of Consultant’s unique personal competence, experience, and specialized personal knowledge.

Moreover, a substantial inducement to City for entering into this Agreement was and is the professional reputation and competence of Consultant. Consultant may not assign this Agreement or any interest therein without the prior written approval of the Contract Administrator. Consultant shall not subcontract any portion of the performance contemplated and provided for herein, other than to the subcontractors noted in the proposal, without prior written approval of the Contract Administrator.

8.5 Survival. All obligations arising prior to the termination of this Agreement and all provisions of this Agreement allocating liability between City and Consultant shall survive the termination of this Agreement.

8.6 Options upon Breach by Consultant. If Consultant materially breaches any of the terms of this Agreement, City’s remedies shall include, but not be limited to, the following:

City Council/RSA Agenda 227 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 12 of 15

8.6.1 Immediately terminate the Agreement;

8.6.2 Retain the plans, specifications, drawings, reports, design documents, and any other work product prepared by Consultant pursuant to this Agreement;

8.6.3 Retain a different consultant to complete the work described in Exhibit A not finished by Consultant; or

8.6.4 Charge Consultant the difference between the cost to complete the work described in Exhibit A that is unfinished at the time of breach and the amount that City would have paid Consultant pursuant to Section 2 if Consultant had completed the work.

Section 9. KEEPING AND STATUS OF RECORDS.

9.1 Records Created as Part of Consultant’s Performance. All reports, data, maps, models, charts, studies, surveys, photographs, memoranda, plans, studies, specifications, records, files, or any other documents or materials, in electronic or any other form, that Consultant prepares or obtains pursuant to this Agreement and that relate to the matters covered hereunder shall be the property of the City. Consultant hereby agrees to deliver those documents to the City upon termination of the Agreement. It is understood and agreed that the documents and other materials, including but not limited to those described above, prepared pursuant to this Agreement are prepared specifically for the City and are not necessarily suitable for any future or other use. City and Consultant agree that, until final approval by City, all data, plans, specifications, reports and other documents are confidential and will not be released to third parties without prior written consent of both parties.

9.2 Consultant’s Books and Records. Consultant shall maintain any and all ledgers, books of account, invoices, vouchers, canceled checks, and other records or documents evidencing or relating to charges for services or expenditures and disbursements charged to the City under this Agreement for a minimum of 3 years, or for any longer period required by law, from the date of final payment to the Consultant to this Agreement.

9.3 Inspection and Audit of Records. Any records or documents that Section 9.2 of this Agreement requires Consultant to maintain shall be made available for inspection, audit, and/or copying at any time during regular business hours, upon oral or written request of the City. Under California Government Code Section 8546.7, if the amount of public funds expended under this Agreement exceeds $10,000.00, the Agreement shall be subject to the examination and audit of the State Auditor, at the request of City or as part of any audit of the City, for a period of 3 years after final payment under the Agreement.

Section 10 MISCELLANEOUS PROVISIONS.

10.1 Attorneys’ Fees. If a party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provision of this Agreement, the prevailing party shall be entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose.

City Council/RSA Agenda 228 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 13 of 15

10.2 Venue. In the event that either party brings any action against the other under this Agreement, the parties agree that trial of such action shall be vested exclusively in the state courts of California in the County of Alameda or in the United States District Court for the Northern District of California.

10.3 Severability. If a court of competent jurisdiction finds or rules that any provision of this Agreement is invalid, void, or unenforceable, the provisions of this Agreement not so adjudged shall remain in full force and effect. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement.

10.4 No Implied Waiver of Breach. The waiver of any breach of a specific provision of this Agreement does not constitute a waiver of any other breach of that term or any other term of this Agreement.

10.5 Successors and Assigns. The provisions of this Agreement shall inure to the benefit of and shall apply to and bind the successors and assigns of the parties.

10.6 Use of Recycled Products. Consultant shall prepare and submit all reports, written studies and other printed material on recycled paper to the extent it is available at equal or less cost than virgin paper.

10.7 Conflict of Interest. Consultant may serve other clients, but none whose activities within the corporate limits of City or whose business, regardless of location, would place Consultant in a “conflict of interest,” as that term is defined in the Political Reform Act, codified at California Government Code Section 81000 et seq.

Consultant shall not employ any City official in the work performed pursuant to this Agreement. No officer or employee of City shall have any financial interest in this Agreement that would violate California Government Code Sections 1090 et seq. Consultant hereby warrants that it is not now, nor has it been in the previous 12 months, an employee, agent, appointee, or official of the City. If Consultant was an employee, agent, appointee, or official of the City in the previous twelve months, Consultant warrants that it did not participate in any manner in the forming of this Agreement.

Consultant understands that, if this Agreement is made in violation of Government Code § 1090 et seq., the entire Agreement is void and Consultant will not be entitled to any compensation for services performed pursuant to this Agreement, including reimbursement of expenses, and Consultant will be required to reimburse the City for any sums paid to the Consultant. Consultant understands that, in addition to the foregoing, it may be subject to criminal prosecution for a violation of Government Code § 1090 and, if applicable, will be disqualified from holding public office in the State of California.

10.8 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or interview related to this Agreement, either orally or through any written materials.

10.9 Contract Administration. This Agreement shall be administered by the City Manager, or his designee, identified as Marilou Ayupan, Public Works Director ("Contract City Council/RSA Agenda 229 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 14 of 15 Administrator"). All correspondence, meeting documation, invoices and project deliverables shall be directed to or through the Contract Administrator.

Marilou Ayupan, P.E.

Public Works Director
City of Union City
34009 Alvarado-Niles Road
Union City, CA 94587

10.10 Notices. Any written notice to Consultant shall be sent to:

Shawn O’Keefe, P.E.

Vice President/Principal
Mark Thomas & Company, Inc.
456 8th Street, Suite 200B
Oakland, CA 94607
[email protected]
All other written notices to City shall be sent to:

Joan M. Malloy Kristopher J. Kokotaylo,
City Manager City Attorney
City of Union City City of Union City
34009 Alvarado Niles Rd. with a copy to 34009 Alvarado Niles Rd.

Union City, CA 94587 Union City, CA 94587

10.12 Professional Seal. Where applicable in the determination of the contract administrator, the first page of a technical report, first page of design specifications, and each page of construction drawings shall be stamped/sealed and signed by the licensed professional responsible for the report/design preparation. The stamp/seal shall be in a block entitled "Seal and Signature of Registered Professional with report/design responsibility," as in the following example. _________________________________________
Seal and Signature of Registered Professional with
report/design responsibility.

10.13 Integration. This Agreement, including the scope of work attached hereto and incorporated herein as Exhibits A, B, and C represents the entire and integrated agreement between City and Consultant and supersedes all prior negotiations, representations, or agreements, either written or oral.

Exhibit A Scope of Services and Project Schedule
Exhibit B Cost Proposal, Reimbursable Expenses and Hourly Charge Rate Schedule Exhibit C Public Works Requirements
City Council/RSA Agenda 230 Tuesday, January 11, 2022
Consulting Services Agreement between
City of Union City and Mark Thomas & Company, Inc. Page 15 of 15

10.14 Counterparts. This Agreement may be executed in multiple counterparts, each of which shall be an original and all of which together shall constitute one agreement.

The Parties have executed this Agreement as of the Effective Date.

CITY OF UNION CITY MARK THOMAS & COMPANY, INC.
____________________________ ______________________________ JOAN MALLOY, CITY MANAGER SHAWN O’KEEFE

VICE PRESIEENT
___________________________
ANNA M. BROWN, CITY CLERK
APPROVED AS TO FORM:
____________________________
KRISTOPHER J. KOKOTAYLO

CITY ATTORNEY
5033628.1
Version 3.2.21
City Council/RSA Agenda 231 Tuesday, January 11, 2022

EXHIBIT A
A-1 SCOPE OF SERVICES
.

City Council/RSA Agenda 232 Tuesday, January 11, 2022
Scope of Services
City of Union City
Quarry Lakes Parkway

Page 1 of 9 ends

EXHIBIT A

SCOPE OF SERVICES

QUARRY LAKES PARKWAY,
CITY PROJECT NO. 18-04
PHASE 1: 7th Street Connection
AND
PHASE 2: Alvarado-Niles Road Connection
FIRST PHASE DESIGN – 35% LEVEL COMPLETION
All work shall be completed by or under the direct supervision of a City of Union City Public Works Director or designated Project Manager. The consultant firm shall use engineers experienced with all aspects of multi-modal roadway design related to the services to be provided.

The Consultant shall have a working knowledge of and use, when applicable, the following nonexclusive list of references:
a. A Policy on Geometric Design of Highways and Streets 2018 (AASHTO) b. Urban Street Design Guide (NACTO)
c. Urban Bikeway Design Guide (NACTO)
d. Don’t Give Up at the Intersection (NACTO)
e. Urban Street Stormwater Guide (NACTO)
f. Highway Design Manual – 7th Edition HDM (CALTRANS)
g. 2021 Bicycle and Pedestrian Master Plan (UNION CITY) h. Union City Standard Details (UNION CITY)
i. Union City Green Infrastructure Plan (UNION CITY)
j. Manual on Uniform Traffic Control Devices - MUTCD (FHWA/CALTRANS) k. Erosion Design, Control Toolbox and Chapter 4: Erosion Control (CALTRANS) l. Construction Site Best Management Practices (BMP) – (CALTRANS) m. AC Transit Design Guidelines (AC TRANSIT)
n. Bay Area Stormwater Management Agencies Association Guidelines o. Americans with Disabilities Act Accessibility Guidelines p. Hydrology & Hydraulics 2018 (Alameda County Flood Control & Water Conservation District) q. Local, state, and federal laws and regulations that pertain to multi-modal roadway design City Council/RSA Agenda 233 Tuesday, January 11, 2022
Scope of Services
City of Union City
Quarry Lakes Parkway

Page 2 of 9 ends

The Scope of Services is divided into six tasks, numbered 1 through 6, which are summarized below.

TASK 1. Project Management
TASK 2. Data Gathering and Review
TASK 3. Pre-Design Report (PDR) Process
TASK 4. Engineering Reports
TASK 5. Survey and Right of Way Engineering
TASK 6. 35% Level of Design Completion
TASK 1. PROJECT MANAGEMENT
Consultant, under this Phase of this Agreement, shall provide project management for each task for the entire duration of the Agreement schedule. It is assumed this contract will last up to 8 months.

The management functions are described in detail below:

1.1.1 Supervise, Coordinate and Monitor Design: Consultant will supervise, coordinate and monitor design for conformance with guidelines, standards and policies as noted herein.

1.1.2 Coordination: Consultants will coordinate with the other design consultants, utility providers and affected agencies for timely flow of information for each task activity.

1.1.3 Codes/Standard Compliance: Consultant will confirm compliance with other codes and standards as acceptable to City. Any deviation from these standards and codes shall be documented as “Design Deviation”.

1.1.4 Maintain Project Files: Consultant will maintain project files and provide a file repository in the Microsoft Teams environment.

1.1.5 Update Project CPM Schedule: Consultant will update the Project CPM schedule on a monthly basis and submit an electronic file at the end of each month.

1.1.6 Meetings: Consultant will attend bi-monthly design coordination check-in meetings.

This task also includes up to 8 stakeholder/agency meetings to resolve engineering issues and one presentation to City Council. This may include meetings with AC Transit, Union City Transit, Caltrans, East Bay Regional Park District, ACFC&WCD and RWQCB.

This Task includes two (2) Bicycle and Pedestrian Advisory Committee (BPAC) meeting and one Parks and Recreation Commission meeting.

This task also includes preparation of utility request letters for project development.

Consultant shall be responsible for interfacing utility design coordination with the City's utility coordinator. Consultant shall confirm utility information shown on the plans by sending existing facility maps back to the provider for location verification. If required for high-risk utility and potential utility conflicts, Consultant shall perform utility potholing as a supplemental service.

City Council/RSA Agenda 234 Tuesday, January 11, 2022
Scope of Services
City of Union City
Quarry Lakes Parkway

Page 3 of 9 ends