Cities Index.
Agenda packet

Vallejo City Council
April 23, 2024

Document
Agenda packet
Meeting
April 23, 2024
Body
Vallejo City Council
Pages
29
Original file
54.6 MB
Text extracted from the city's file for reading and search. Open the original on vallejoca.api.civicclerk.com. That file is the official record.

construction standards. Other project improvements include adding school signage, developing perimeter fencing for security purposes, constructing curbs, ramps, and gutters; trenching along Georgia Street for underground utilities; removing/reconfiguring existing curbs to accommodate new parking; minor removal of shrubs and trees; adding a new ADA accessible ramp that would connect Sacramento Street to the rear entrance of the building; reconfiguring 16 parking spaces into eight parallel parking spaces along Sacramento Street, as well as adding 36 bicycle parking spaces. New perimeter fencing for security purposes, school signage, and 36 bicycle parking spaces would be included.

The school would operate Monday through Friday from 8:00 a.m. to 3:30 p.m. with occasional after-school activities and weekend events (e.g., parent engagement meetings). During the initial development phase, the school would house a maximum of 249 students, ten teaching staff, and 25 administrative staff. At full enrollment, there would be a maximum of 400 students and approximately 35 staff members.

NOISE FUNDAMENTALS
Sound can be described as the mechanical energy of a vibrating object transmitted by pressure waves through a liquid or gaseous medium (e.g., air) to a human ear. Noise is defined as loud, unexpected, or annoying sound. In the science of acoustics, the fundamental model consists of a sound (or noise) source, a receiver, and the propagation path between the two. The loudness of the noise source and obstructions or atmospheric factors affecting the propagation path to the receiver determine the sound level and characteristics of the noise perceived by the receiver.

The field of acoustics deals primarily with the propagation and control of sound.

The amplitude of pressure waves generated by a sound source determines the loudness of that source. Sound pressure amplitude is measured in micro-Pascals (mPa). One mPa is approximately one hundred billionth (0.00000000001) of normal atmospheric pressure. Sound pressure amplitudes for different kinds of noise environments can range from less than 100 to 100,000,000 mPa. Because of this large range of values, sound is rarely expressed in terms of mPa. Instead, a logarithmic scale is used to describe sound pressure level (SPL) in terms of decibels (dB).

Because decibels are logarithmic units, SPLs cannot be added or subtracted through ordinary arithmetic. Under the decibel scale, a doubling of sound energy corresponds to a 3-dB increase. In other words, when two identical sources are each producing sound of the same loudness, the resulting sound level at a given distance would be 3 dB higher than if only one of the sound sources were producing sound under the same conditions. For example, if one idling truck generates an SPL of 70 dB, two trucks idling simultaneously would not produce 140 dB; rather, they would combine to produce 73 dB. Under the decibel scale, three sources of equal loudness together produce a sound level 5 dB louder than one source.

The decibel scale alone does not adequately characterize how humans perceive noise. The dominant frequencies of a sound have a substantial effect on the human response to that sound. Although the intensity (energy per unit area) of the sound is a purely physical quantity, the loudness or human response is determined by the characteristics of the human ear. Human hearing is limited in the range of audible frequencies as well as in the way it perceives the SPL in that range. In general, people are most sensitive to the frequency range of 1,000-8,000 Hz and perceive sounds within this range better than sounds of the same amplitude with frequencies outside of this range. To approximate the response of the human ear, sound levels of the individual frequency bands are weighted, depending on the human sensitivity to those frequencies. Then, an “A-weighted” sound level (expressed in units of A-weighted decibels) can be computed based on this information. The A-weighting dB (dBA) scale approximates the frequency response of the average young ear when listening to most ordinary sounds. When people make judgments of the relative loudness or annoyance of a sound, their judgment correlates well with the A-scale sound levels of those sounds.

Thus, noise levels are typically reported in terms of A weighted decibels. All sound levels discussed in this study are expressed in A-weighted decibels.

Final Noise and Vibration Study - Elite Charter School Project February 21, 2024

Page 3 ends

Common Noise Descriptors
Various time-averaging noise metrics are used in the field of acoustics, which can be chosen to better characterize the noise source in question and how people perceive it. The following definitions are applicable to the understanding of this analysis and the City of Vallejo’s noise standards.  Equivalent Continuous Sound Level (Leq): Leq represents an average of the sound energy occurring over a specified period. In effect, Leq is the steady-state sound level containing the same acoustical energy as the time- varying sound that actually occurs during the same period.  Maximum Noise Level (Lmax): the highest time-weighted sound level measured during a measurement period.  Minimum Noise Level (Lmin): The lowest time-weighted sound level measured during a measurement period.  Day-Night Noise Level (Ldn): the average A-weighted sound level during a 24-hour period with a 10-dB penalty applied during the sensitive nighttime hours of 10:00 p.m. to 7:00 a.m.  Percentile-Exceeded Sound Level (Lx): Lx represents the sound level exceeded for a given percentage of a specified period (e.g., L10 is the sound level exceeded 10 percent of the time, and L90 is the sound level exceeded 90 percent of the time). Th City of Vallejo Municipal Code uses an L50 metric, explained in “Applicable Noise Standards.” Existing Noise Sensitive Land Uses
Noise-sensitive land uses are generally considered to include uses where noise exposure could result in health- related risks to individuals, as well as places where quiet is an essential element of their intended purpose, such as schools, libraries, and residences. Residential uses are of primary concern because of the potential for increased and prolonged exposure of individuals to both interior and exterior noise levels, and because these land uses are places of rest and sleep for City residents. The project site is located along Georgia Street, just west of the intersection with Sacramento Street. The nearest sensitive receiver to the project site is the Vallejo John F. Kennedy Library, located approximately 0.08 miles northwest of the project site, north of Georgia Street. There are multi-family residential dwellings along Maine Street, approximately 0.10 miles south of the project site.

Existing Noise Sources and Ambient Levels
The sound levels in most communities fluctuate, depending on the activity of nearby and distant noise sources, time of the day, or season of the year, with major roads and highways typically the primary sources of ambient noise in a community. Local roads closest to the project site include Georgia Street and Sacramento Street. The nearest major roadway to the project site is State Route (SR) 29, located approximately 0.18 miles east of the project site. The area surrounding the project site can be characterized as urbanized and developed, and includes commercial uses such as restaurants, banks, and the Vallejo Transit Center. Primary noise sources include roadway traffic noise (e.g., engine noise, car radios) and noise associated with the Greyhound Bus Station / Vallejo Transit Center (e.g., busses idling, people talking) on the south side of the project site.

To establish existing noise levels, an ambient noise survey was conducted on January 4 th and January 5th, 2024. One
long-term (LT) (24-hour) and three short-term (ST) (15-minute) measurements were conducted using a Piccolo II integrating sound level meter. The meter was calibrated before use with a Hangzhou Aihua Class 2 acoustical calibrator to ensure measurement accuracy. The measurement equipment meets all pertinent specifications of the American National Standards Institute. Meteorological conditions during the measurement period were adequate for reliable noise measurements, with clear skies, temperatures ranging from 43 degrees Fahrenheit (°F) to 57°F, and maximum windspeed of 7 miles per hour (mph), and no precipitation.

In accordance with Section 16.502.09.E of the City Code, the noise meter was located 5 feet above the ground and in no case was it within 10 feet of nearby walls or other structures that could affect noise measurements. On-site measurements were conducted for the purpose of established existing ambient noise levels for use in the noise compatibility assessment below. Noise levels are summarized below in Table 1 with corresponding labels indicating Final Noise and Vibration Study - Elite Charter School Project February 21, 2024

Page 4 ends

the locations of the measurements on Figure 1. A detailed summary of raw measurement data and photographs of meter location are included in Attachment A.

Table 1 Summary of Existing Ambient Noise Level Survey
Short-Term Measurements (15-minute)
Noise Measurement
Locations1 Date Start/Stop Time Leq dBA Lmax dBA Lmin dBA ST 1 1/4/2024 9:02 am/9:17 am 56.3 66.3 42.3
ST 2 1/4/2024 8:45 am/9:00 am 55.5 70.1 45.1
ST 3 1/4/2024 9:18 am/9:33 am 59.7 78.8 48.1
Long-Term Measurement (24-hour)
Date Start/Stop Time. CNEL dBA
LT 1 1/4/2024-1/5-
2024
10:00 a.m. / 10:00 a.m. 66.0
Notes: ST = short-term; LT = long-term; Leq = average hour noise level; Lmax = maximum instantaneous noise level; Lmin = minimum instantaneous noise level; dBA = A-weighted decibel; CNEL = community equivalent noise level.

Noise measurement locations correspond to labels on Figure 1.

Source: Field data collected by Ascent Environmental, Inc., 2024.

APPLICABLE NOISE STANDARDS
Federal
The Federal Transit Administration (FTA) developed the Transit Noise and Vibration Impact Assessment Manual, which provides guidance to engineers, planners, and consultants in assessing vibration from construction, operation, and maintenance of projects. To address the human response to ground vibration, the FTA has set forth guidelines for maximum-acceptable vibration criteria for different types of land uses. These guidelines are presented below in Table 2. In addition, FTA has also established construction vibration damage criteria, shown below in Table 3. Where local agencies have not adopted vibration criteria, as is the case in Vallejo, these criteria apply.

Table 2 Ground-Borne Vibration Impact Criteria for General Assessment for Human Response Land Use Category Ground-Borne Vibration Impact
Levels for Human Response
Ground-Borne Vibration Impact
Levels for Human Response
Ground-Borne Vibration Impact
Levels for Human Response
Frequent Events1 Occasional Events2 Infrequent Events3
Category 1: Buildings where vibration
would interfere with interior
operations.
654 654 654
Category 2: Residences and buildings
where people normally sleep.
72 75 80
Category 3: Institutional land uses
with primarily daytime uses.
75 78 83
Notes: VdB re 1 microinch/second = vibration decibels referenced to 1 microinch/second and based on the root mean square (RMS) velocity amplitude. 1 “Frequent Events” is defined as more than 70 vibration events of the same source per day. 2 “Occasional Events” is defined as between 30 and 70 vibration events of the same source per day. 3 “Infrequent Events” is defined as fewer than 30 vibration events of the same source per day.

Final Noise and Vibration Study - Elite Charter School Project February 21, 2024

Page 5 ends

4 This criterion is based on levels that are acceptable for most moderately sensitive equipment such as optical microscopes. Vibration-sensitive manufacturing or research would require detailed evaluation to define acceptable vibration levels.

Source: FTA 2018: 123–126.

Noise and Vibration Study - Elite Charter School Project January 22, 2024

Page 6 ends

Sources: adapted by Ascent in 2023.

Figure 1 Noise Measurement Locations

Noise and Vibration Study - Elite Charter School Project January 22, 2024

Page 7 ends

Table 3 FTA Construction Damage Vibration Criteria
Land Use Category PPV, in/sec
Reinforced-concrete, steel or timber (no plaster) 0.5
Engineered concrete and masonry (no plaster) 0.3
Non-engineered timber and masonry buildings 0.2
Buildings extremely susceptible to vibration damage 0.12 Source: FTA 2018.

Local
City of Vallejo General Plan
Table NBE-1 of the Vallejo General Plan (presented as Table 4 in this analysis) establishes guidelines for noise exposure to new development, based on the specific land use. New schools are subject to existing noise exposure levels of up to 70 dBA Ldn (City of Vallejo 2017: 4-37).

Table 4 California Land Use Compatibility for Community Noise Environments Land Use Type Normally Acceptable1 Conditionally Acceptable2 Normally Unacceptable3 Unacceptable4 Residential – Low density
Single-Family, Duplex,
Mobile Homes
Less than 60 Ldn 55-70 Ldn 70-75 Ldn 75+ Ldn
Residential – Multiple
Family
Less than 65 Ldn 60-70 Ldn 70-75 Ldn 75+ Ldn
Transient Lodging,
Motels, Hotels
Less than 65 Ldn 60-70 Ldn 70-80 Ldn 80+ Ldn
Schools, Libraries,
Churches, Hospitals,
Nursing Homes
Less than 70 Ldn 60-70 Ldn 70-80 Ldn 80+ Ldn
Office Buildings,
Businesses, Commercial,
and Professional
Less than 75 Ldn 70-75 Ldn 75+ Ldn N/A
Notes: Ldn = day-night level; dBA = A-weighted decibels Source: Governor’s Office of Planning and Research 2003 as cited in City of Vallejo 2017: Table NBE-1. 1 Specified land use is satisfactory based upon the assumption that any buildings involved are of normal conventional construction, without any special noise insulation requirements.
2 New construction or development should be undertaken only after a detailed analysis of the noise reduction requirements is made and the needed noise insulation features included in the design. Conventional construction, but with closed windows and fresh air supply systems or air conditioning will normally suffice.
3 New construction or development should generally be discouraged. If new construction does proceed, a detailed analysis of the noise reduction requirements must be made and needed noise insulation features included in the design. 4 New construction or development generally should not be undertaken.

City of Vallejo Municipal Code
Section 16.502.03 Construction Management
The project site is in the City of Vallejo; therefore, the City’s local policies pertaining to noise are applicable to the project. City Code Section 16.502.03.C requires that all construction and transport equipment be muffled in accordance with State and federal laws. Section 16.502.03(E) mandates that grading and pile driving operations within Administrative Draft Noise and Vibration Study - Elite Charter School Project January 22, 2024

Page 8 ends

¼ mile of residential units be limited to the hours between 8:00 a.m. and 5:00 p.m. on weekdays to ensure compliance with the requirements for construction activity.

Section 16.502.09 Noise
Section 16.502.09 of the City Code provides maximum allowable noise standards for various land uses, which are the basis for this noise assessment. Per Section 16.502.09.C.2, the requirements impose limits on regularly occurring noise for the specified time periods, averaged over an hour. Table 16.502-C of the City Code (presented as Table 5 in this study) establishes daytime (7:00 a.m. to 10:00 p.m.) and nighttime (10:00 p.m. to 7:00 a.m.) noise standards applicable to various land uses, applicable on the subject property line, as well as noise limits at receiving residential zone boundaries. Maximum exterior noise levels are summarized below in Table 5.

Table 5 City of Vallejo Maximum Noise Levels by Noise Zone Noise Zoning Districts
Maximum Noise Level in
dBA (level not to be
exceeded more than 30
minutes in any hour)
Maximum Noise Level in dBA
(level not to be exceeded more
than 30 minutes in any hour)
Maximum Noise Level in dBA
(level not to be exceeded more
than 50 minutes in any hour)
Measured at property line or
district boundary
Measured at any boundary of a
residential zone
Between 10:00 p.m. and 7:00
a.m., measured at any boundary
of a residential zone
Single-unit Residential 60 60 -
Multiple-unit Residential 65 65 -
Commercial and Mixed-Use, Medical,
Office
70 60 50 or ambient noise level
Light Industrial 75 65 50 or ambient noise level
General Industrial 75 65 50 or ambient noise level
Public Facilities and Community Use 65 60 50 or ambient noise level Open Space and Recreational Districts 65 60 50 or ambient noise level Source: City of Vallejo 2023.

Section 16.502.09.C.3 establishes that the standard limits in Table 16.502-C (presented as Table 5 in this study) shall be adjusted by 5 decibels for any noise that contains a steady, pure tone such as a whine, screech or hum, or an impulsive sound such as hammering or riveting, or contains music or speech, as described in Table 16.502-D (presented as Table 6 in this study).

Table 6 Time and Adjustments to City Noise Standards
Time and Type of Noise Adjustment (Decibels)
Any type other than construction and related activities between 7:00 a.m. and 10:00 p.m.
+5
Noise of unusual impulsive character (e.g., hammering or drilling) -5 Noise of unusual periodic character (e.g., hammering or screeching) -5 Source: City of Vallejo 2023.

Section 16.502.09.D.1 establishes specific hours and noise standards for construction in residential zoning districts and any mixed-use district. Specifically, construction, demolition, and related loading/unloading activities that may generate noise exceeding levels in Table 16.502.E (presented as Table 7 in this study) shall be limited to hours between 7:00 a.m. and 7:00 p.m. in residential zoning districts and in any mixed-use district.

Administrative Draft Noise and Vibration Study - Elite Charter School Project January 22, 2024

Page 9 ends

Table 7 Maximum Noise Level for Temporary Construction Activity RR, RLD RMD, RHD, NMX, NC Commercial (including medical and office) and Industrial
Mobile construction equipment – non-scheduled, intermittent, and short-term for less than 15 days Weekdays 7:00 a.m. to 6:00 p.m. 75 dBA 80 dBA 85 dBA
Saturdays 9:00 a.m. to 6:00 p.m. 60 dBA 65 dBA 70 dBA
Sundays and legal holidays None None None
Stationary construction equipment
Weekdays 7:00 a.m. to 6:00 p.m. 60 dBA 65 dBA 70 dBA
Saturdays 9:00 a.m. to 6:00 p.m. 60 dBA 65 dBA 70 dBA
Sundays and legal holidays None None None
Notes: RR = Rural Residential; RLD = Residential Low Density; RMD = Residential Medium Density; RHD = Residential High Density; NMX = Neighborhood Mixed Use; NC = Neighborhood Commercial
Source: City of Vallejo 2023.

THRESHOLDS OF SIGNFIICANCE
Based on the CEQA Appendix G Checklist and adopted City of Vallejo noise standards, the project would result in a significant impact to noise if it would result in:
 Short-term construction noise levels that exceed 65 dBA Leq at Residential Medium Density, Residential High Density, Neighborhood Mixed Use, Neighborhood Commercial land uses during the daytime hours (i.e., 7:00 a.m. to 6:00 p.m. weekdays and 9:00 a.m. to 6:00 p.m. Saturdays);  Short-term vibration levels that result in disturbance to sensitive uses or the potential to cause structural damage to structures;
 Operational stationary noise levels that exceed 65 dBA Leq at residential uses; or  Operational mobile noise sources that result in a substantial (i.e., 5 dBA) increase in noise.

ANALYSIS
Potential to Result in Substantial Temporary (Construction) Noise Short-term construction noise levels would fluctuate depending on the type, number, and duration of usage of varying equipment. Additionally, the effects of construction noise largely depend on the type of construction activities being performed; noise levels generated by those activities; distances to noise-sensitive receptors; the relative locations of noise attenuating features such as topography and existing structures; and existing ambient noise levels.

The proposed project would not require the demolition of the existing building. The project would include internal improvements to reconfigure the space for classrooms, administrative offices, and other education-related amenities.

Both phases of development would include various onsite improvements and upgrades to the existing buildings, including the installation of wrought iron fencing; removal of shrubs and trees; construction of curbs, ramps, and gutters; trenching for underground utilities; removal/reconfiguration of existing paved areas (e.g., curb and sidewalk portions) to accommodate reconfigured street parking; and construction of a new accessible ramp that would connect Sacramento Street to the rear entrance of the building. Construction equipment associated with these activities could include dump trucks, concrete mixers, pickup trucks, chainsaws, and concrete saws. Based on reference noise levels for typical construction equipment, the demolition/removal of existing concrete using concrete Administrative Draft Noise and Vibration Study - Elite Charter School Project January 22, 2024

Page 10 ends

saws would represent the loudest phases of construction. Thus, the noise assessment is based on this phase as all subsequent phases and associated noise levels would be lower than this activity.

As shown above in Table 7, the City of Vallejo identifies one set of standards for mobile construction equipment and one set of standards for stationary equipment. Both mobile (e.g., dump trucks and pickup trucks) and stationary equipment (e.g., concrete saws) could be used in project construction. The project site is located within a mixed-use zoning area, and thus, although downtown mixed-use is not specifically included in Table 7, the standards that apply for other mixed-use areas included in the table (i.e., neighborhood mixed use) are used in this analysis (i.e., 65 dBA) and are applied as hourly averages (i.e., L
eq).

Modeling identified that the operation of a concrete saw would result in noise levels of 83.0 dBA Leq at 50 feet. See Attachment A for modeling inputs and results. Such activity would reduce to the City’s construction noise standard of 65 dBA Leq for mixed-use areas at 398 feet. There are no sensitive receptors located within this distance. The sensitive receptor nearest to Georgia Street, where this modeling scenario would occur, is the Vallejo John F. Kennedy Library located approximately 400 feet northwest of the project site. At this distance, noise levels would attenuate to 64.9 dBA Leq, and therefore would not exceed applicable City standards. The nearest residential receptors are located approximately 494 feet south of the project site. At this distance, noise levels from the use of a concrete saw would attenuate to 63.1 dBA Leq, and therefore would not exceed applicable City standards.

Based on the modeling conducted for the worst-case construction phase, project construction noise would not conflict with City standards. Further, construction activity and resulting noise would be temporary in nature, with an anticipated 8-month duration for each phase of the project and would end once construction is complete. During this time, construction activities would occur between 7:00 a.m. and 3:00 p.m., as no nighttime construction work is proposed. For these reasons, the noisiest construction equipment would not generate significant levels of noise that exceed adopted noise standards and would not substantially affect nearby receptors.

Potential Construction Vibration
Project construction would not involve the use of ground vibration-intensive activities, such as pile driving or blasting.

The pieces of construction equipment that would be used during project construction, such as concrete saws and light trucks, generate little to no ground vibration and are not considered impact devices (FHWA 2006). Construction activity would be intermittent and temporary and is estimated to take approximately eight months for each phase.

Specifically, construction activities associated with the project would occur during daytime hours (i.e., between 7:00 a.m. and 3:00 p.m.). Therefore, any vibration activity that would result from project construction would not occur during evening or nighttime hours, thereby reducing potential vibration impacts (i.e., annoyance) to nearby receptors during more sensitive hours of the day. Additionally, the project would not involve the development of any major sources of ground vibration such as commercial railways or passenger rail transit lines. Therefore, the project would not result in long-term operational activities associated with permanent or substantial levels of ground vibration. For these reasons, construction and operational generated vibration would not result in the potential for structural damage or human annoyance.

Operational Stationary Noise
Mechanical Equipment Noise
The project would include mechanical building equipment as part of the heating, ventilation, and air conditioning (HVAC) systems at the project site. HVAC equipment is a common noise source associated with land use development and is currently used on the project site. Specifically, there are currently 20 air conditioning units and three mechanical fans on the building rooftop. Therefore, noise associated with the mechanical equipment would not represent a new noise source in the area. Implementation of the project would result in the removal of 20 air conditioning units and three mechanical fans, as well as the installation of 14 new air conditioning units and five new mechanical fans. Therefore, the project would include fewer pieces of mechanical equipment than previously located Administrative Draft Noise and Vibration Study - Elite Charter School Project January 22, 2024

Page 11 ends

on the site. Further, as the school would generally operate during the daytime hours (i.e., between 9:00 a.m. and 3:00 p.m.), noise associated with building equipment would not result in substantial increases during sensitive times of the day. For these reasons, building equipment noise would not result in adverse effects to nearby sensitive receptors.

Outdoor Common Areas
The project would include the addition of outdoor common areas along Georgia Street that would be in use during daytime school hours. The addition of the outdoor patio could result in an increase in localized noise on the project site associated with people talking, congregating, and eating outdoors. Noise associated with people talking and eating would not be unique, dissimilar, or louder than existing ambient noise levels associated with urban environments (e.g., roadway traffic, people talking, landscape equipment). Additionally, the outdoor areas would be in use for short periods of time during daytime hours (i.e., weekdays between 9:00 a.m. and 3:00 p.m.) and would not be operational during nighttime hours and would not emit nighttime noise. For these reasons, noise from outdoor common areas would not result in adverse effects to nearby sensitive receptors.

Loading and Unloading
The operation of the new school would require daily delivery of food for students. Food delivery would take place Monday through Friday from 8:00 a.m. to 9:00 a.m. and from 11:00 a.m. to 1:00 p.m. As shown in the site plans, the deliveries would take place in the designated loading/unloading area along Sacramento Street, on the eastern frontage of the project site. Noise sources from truck activity associated with delivery areas are usually short-term and can include activities such as vehicle idling, engine revving, and the release of air brakes on heavy trucks. Based on a noise measurement conducted by Ascent on April 20, 2023, at the loading and unloading dock at an Anheuser Bush facility, noise from truck activity can be as loud as 59 dBA L eq at 100 feet (Ascent 2023). The off-site residential
receptor closest to the on-site delivery area are the multi-family residences located along Maine Street, approximately 494 feet south of the project site. Delivery truck-generated noise would be 45.1 dBA Leq at 494 feet.

Therefore, delivery truck noise would not exceed the City’s daytime noise standards of 65 dBA Leq.

Summary
Project operation would result in new stationary noise sources such as noise associated with HVAC equipment, outdoor common areas, and food delivery activity. Noise levels from new and existing noise sources would not exceed applicable daytime exterior noise standards established by the City. Further, as described in detail above, none of these sources would operate during the nighttime because the school would be closed by 3:00 p.m. daily, with limited after-school, evening, or weekend activities. Thus, project-generated noise would not result in any exceedance of nighttime noise standards.

Operational Mobile Source Noise
Vehicle trips associated with the project would include trips generated by employees and students. These trips would result in an increase in average daily traffic volumes and associated increase in traffic noise levels along roadway segments that would be used to travel to and from the project site. To analyze the impact of project-generated operational transportation noise sources, traffic noise levels under existing and existing-plus-project conditions were modeled for affected roadway segments. Refer to Attachment A for detailed noise modeling input parameters.

Due to the logarithmic properties of noise, a 3 dB increase in noise is characterized as barely perceptible, a 5 dB increase as distinctly perceptible, and a 10 dB increase as a doubling of the noise level. Further, it requires a doubling of the noise source to result in an audible (i.e., 3 dB) increase. Thus, a perceptible increase in noise (i.e., 5 dB), would be considered a substantial increase in noise. It should be noted that potential trip reductions from the student survey were not accounted for in this analysis, resulting in a conservative roadway analysis. Table 8 shows the existing and existing plus project noise levels of the roadway segments nearest to the project site.

Administrative Draft Noise and Vibration Study - Elite Charter School Project January 22, 2024

Page 12 ends

Table 8 Existing and Existing Plus Project Traffic Noise Levels Street Name From To
Existing Conditions Existing + Project Noise Increase
dBA (Ldn)
Sonoma Boulevard Florida Street Georgia Street 55.8 56.3 0.6 Sonoma Boulevard Georgia Street Curtola Parkway 59.1 59.2 0.1 Georgia Street Mare Island Way Santa Clara Street 51.4 52.5 1.1 Georgia Street Santa Clara Street Sacramento Street 49.6 50.9 1.2 Georgia Street Sacramento Street Sonoma Boulevard 52.2 52.9 0.7 Curtola
Parkway/Mare Island
Way
Maine Street Sonoma Boulevard 60.7 61.1 0.5
Sacramento Street Georgia Street Maine Street 50.2 53.7 3.4 Notes: dBA = A-weighted decibel; Ldn = day-night equivalent noise level.

Source: Modeled by Ascent 2023.

As shown in Table 8, implementation of the project would result in noise increases ranging from 0.1 dBA to 3.4 dBA Ldn on roadway segments within the project vicinity. The project would not result in a substantial noise increase (i.e., 5 dB or more) compared to existing conditions. All roadways currently experience noise levels below the “Normally Acceptable” levels applicable to the project area (i.e, 60 dBA Ldn for single-family residential, 65 dBA Ldn for residential multi-family and 75 dBA Ldn for nonresidential uses) and the project would not result increases in noise that exceed these levels along modeled roadway segments. Long-term operational noise from the project would not result in substantial increases in noise or levels that exceed applicable City standards.

Exposure to Existing Community Noise
As discussed above, the Vallejo General Plan establishes guidelines for noise exposure to new development based on the specific land use. Based on the land use categories established in Table NBE-1 (presented as Table 4 in this study) of the General Plan, new schools are subject to existing noise exposure levels of up to 70 dBA Ldn. As shown above in Table 1, an existing 24-hour noise measurement was conducted on January 4, 2024 and using the individual Leq data for each hour of the 24-hour period, a 24-hour Ldn was calculated of 65.5 dBA, which is below the level identified by the City of Vallejo as normally acceptable for school uses (i.e., 70 dBA Ldn). The proposed school would not be exposed to noise levels exceeding City of Vallejo’s adopted noise exposure levels.

CONCLUSION
Project-generated construction noise would be short-term and temporary and would comply with the City of Vallejo’s construction noise standards and would not expose sensitive land uses to excessive noise. The project would not result in operational sources of substantial vibration. Project construction would not require the use of vibration- inducing equipment such as pile drivers and all construction would occur during the less sensitive daytime hours when people are awake thereby reducing the exposure of sensitive receptors to substantial vibration levels.

Operational stationary noise sources would not result in new substantial sources of noise to the project area or exceed applicably City standards. Operational increases in noise levels from vehicle trips would not result in a substantial increase in noise over existing conditions. Therefore, project related construction and operational noise and vibration would not be expected to exceed federal, state, or local standards or expose sensitive land uses to substantial increases in noise or vibration levels. Thus, approval of the project would not result in a significant effect related to noise.

Administrative Draft Noise and Vibration Study - Elite Charter School Project January 22, 2024

Page 13 ends

REFERENCES
City of Vallejo. 2023. City of Vallejo Municipal Code Chapter 16.502.09 Noise. Available https://library.municode.com/ca/vallejo/codes/municipal_code?nodeId=TIT16ZO_PTVSIDEST_CH16.502PEST_

16.502.09NO. Accessed December 2023.

City of Vallejo. 2017. Propel Vallejo General Plan 2040. Available:
https://www.cityofvallejo.net/common/pages/DisplayFile.aspx?itemId=17961496. Accessed December 18, 2023.

Federal Transportation Authority. 2018 (September). Transit Noise and Vibration Impact Assessment Manual.

Washington, DC. Available: https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/research- innovation/118131/transit-noise-and-vibration-impact-assessment-manual-fta-report-no-0123_0.pdf.

Accessed December 2023.

Federal Highway Administration. 2006 (January). Roadway Construction Noise Model User’s Guide. Washington, D.C.

Prepared by the Research and Innovative Technology Administration, Cambridge, MA. Available:
https://www.fhwa.dot.gov/environment/noise/construction_noise/rcnm/rcnm.pdf. Accessed December 2023.

Ascent 2023 (November). Noise Technical Study for the 5037 Patata Street Industrial Development Project. Prepared for the City of South Gate, South Gate, CA.

Attachment A
Noise Modeling and Measurements
Attenuation Calculations for Stationary Noise Sources
KEY: Orange cells are for input.

Grey cells are intermediate calculations performed by the model.

Green cells are data to present in a written analysis (output).

Noise Source/ID Attenuated Noise Level at Receptor
noise level distance Ground Type noise level distance
(dBA) @ (ft) (soft/hard) (dBA) @ (ft)
truck activity 59.0 @ 100 hard 2 5 0.00 45.1 @ 494
Notes:

Sources:

Computation of the ground factor is based on the equation presentd in Table 4-26 on pg. 86 of FTA 2018, where the distance of the reference noise leve can be adjusted and the usage factor is not applied (i.e., the usage factor is equal to 1).

Federal Transit Association (FTA). 2018 (September). Transit Noise and Vibration Impact Assessment. Washington, D.C. Available:
<http://www.transit.dot.gov/sites/fta.dot.gov/files/docs/research-innovation/118131/transit-noise-and-vibration-impact-assessment-manual-fta-report- STEP 1: Identify the noise source and enter
the reference noise level (dBA and distance).

STEP 2: Select the ground type (hard or soft),
and enter the source and receiver heights.

STEP 3: Select the distance to the
receiver.

Estimates of attenuated noise levels do not account for reductions from intervening barriers, including walls, trees, vegetation, or structures of any type.

Computation of the attenuated noise level is based on the equation presented on pg. 176 and 177 of FTA 2018.

Source
Height (ft)
Receiver
Height (ft)
Ground
Factor
Attenuation CharacteristicsReference Noise Level

Sidewalk Improvements
Location
Distance to Nearest
Receptor in feet Equipment
Usage
Factor1
Threshold 398 Concrete Saw 0.2
SR 1 - Library 400
SR 2- Residences 494
Ground Type hard
Source Height 8
Receiver Height 5
Ground Factor2 0.00
Predicted Noise Level 3
Concrete Saw 83.0
Sources:
1 Obtained from the FHWA Roadway Construction Noise Model, January 2006. Table 1. 2 Based on Figure 6-5 from the Federal Transit Noise and Vibration Impact Assessment, 2006 (pg 6-23). 3 Based on the following from the Federal Transit Noise and Vibration Impact Assessment, 2006 (pg 12-3).

Leq(equip) = E.L.+10*log (U.F.) - 20*log (D/50) - 10*G*log (D/50) Where: E.L. = Emission Level;
U.F.= Usage Factor;
G = Constant that accounts for topography and ground effects (FTA 2006: pg 6-23); and D = Distance from source to receiver.

63.1 83.0
Reference Emission
Noise Levels (Lmax) at 50
feet1

64.9 Combined Predicted
Noise Level (Leq dBA)

65.0 Combined Predicted Noise Level (Leq dBA at 50 feet) Leq dBA at 50 feet3
90 Trenching (Leq)
Location
Distance to Nearest
Receptor in feet Equipment
Usage
Factor1
Threshold 264 Concrete Mixer Truck 0.2
SR 1 - Library 400 Pumps 0.5
SR 2- Residences 494
Ground Type hard
Source Height 8
Receiver Height 5
Ground Factor2 0.00
Predicted Noise Level 3
Concrete Mixer Truck 78.0
Pumps 74.0

79.5 Sources:
1 Obtained from the FHWA Roadway Construction Noise Model, January 2006. Table 1. 2 Based on Figure 6-5 from the Federal Transit Noise and Vibration Impact Assessment, 2006 (pg 6-23). 3 Based on the following from the Federal Transit Noise and Vibration Impact Assessment, 2006 (pg 12-3).

Leq(equip) = E.L.+10*log (U.F.) - 20*log (D/50) - 10*G*log (D/50) Where: E.L. = Emission Level;
U.F.= Usage Factor;
G = Constant that accounts for topography and ground effects (FTA 2006: pg 6-23); and D = Distance from source to receiver.

Leq dBA at 50 feet3
Combined Predicted Noise Level (Leq dBA at 50 feet)

59.6 Combined Predicted
Noise Level (Leq dBA)
Reference Emission
Noise Levels (Lmax) at 50
feet1

65.0 85

61.4 77

Equipment Description
Acoustical
Usage
Factor (%)
Spec
721.560
Lmax @
50ft (dBA
slow)
Actual
Measured
Lmax @
50ft
(dBA slow)
No. of
Actual Data
Samples
(count)
Spec
721.560
LmaxCalc
Spec
721.560
Leq
Distance
Actual
Measured
LmaxCalc
Actual
Measured
Leq
Auger Drill Rig 20 85 84 36 79.0 72.0 100 78.0 71.0
Backhoe 40 80 78 372 74.0 70.0 100 72.0 68.0
Bar Bender 20 80 na 0 74.0 67.0 100
Blasting na 94 na 0 88.0 100
Boring Jack Power Unit 50 80 83 1 74.0 71.0 100 77.0 74.0 Chain Saw 20 85 84 46 79.0 72.0 100 78.0 71.0
Clam Shovel (dropping) 20 93 87 4 87.0 80.0 100 81.0 74.0 Compactor (ground) 20 80 83 57 74.0 67.0 100 77.0 70.0
Compressor (air) 40 80 78 18 74.0 70.0 100 72.0 68.0
Concrete Batch Plant 15 83 na 0 77.0 68.7 100
Concrete Mixer Truck 40 85 79 40 79.0 75.0 100 73.0 69.0 Concrete Pump Truck 20 82 81 30 76.0 69.0 100 75.0 68.0 Concrete Saw 20 90 90 55 84.0 77.0 100 84.0 77.0
Crane 16 85 81 405 79.0 71.0 100 75.0 67.0
Dozer 40 85 82 55 79.0 75.0 100 76.0 72.0
Drill Rig Truck 20 84 79 22 78.0 71.0 100 73.0 66.0
Drum Mixer 50 80 80 1 74.0 71.0 100 74.0 71.0
Dump Truck 40 84 76 31 78.0 74.0 100 70.0 66.0
Excavator 40 85 81 170 79.0 75.0 100 75.0 71.0
Flat Bed Truck 40 84 74 4 78.0 74.0 100 68.0 64.0
Front End Loader 40 80 79 96 74.0 70.0 100 73.0 69.0
Generator 50 82 81 19 76.0 73.0 100 75.0 72.0
Generator (<25KVA, VMS signs) 50 70 73 74 64.0 61.0 100 67.0 64.0 Gradall 40 85 83 70 79.0 75.0 100 77.0 73.0
Grader 40 85 na 0 79.0 75.0 100
Grapple (on Backhoe) 40 85 87 1 79.0 75.0 100 81.0 77.0 Horizontal Boring Hydr. Jack 25 80 82 6 74.0 68.0 100 76.0 70.0 Hydra Break Ram 10 90 na 0 84.0 74.0 100
Impact Pile Driver 20 95 101 11 89.0 82.0 100 95.0 88.0 Jackhammer 20 85 89 133 79.0 72.0 100 83.0 76.0
Man Lift 20 85 75 23 79.0 72.0 100 69.0 62.0
Mounted Impact Hammer (hoe ram) 20 90 90 212 84.0 77.0 100 84.0 77.0 Pavement Scarafier 20 85 90 2 79.0 72.0 100 84.0 77.0
Paver 50 85 77 9 79.0 76.0 100 71.0 68.0
Pickup Truck 40 55 75 1 49.0 45.0 100 69.0 65.0
Pneumatic Tools 50 85 85 90 79.0 76.0 100 79.0 76.0
Pumps 50 77 81 17 71.0 68.0 100 75.0 72.0
Refrigerator Unit 100 82 73 3 76.0 76.0 100 67.0 67.0
Rivit Buster/chipping gun 20 85 79 19 79.0 72.0 100 73.0 66.0 Rock Drill 20 85 81 3 79.0 72.0 100 75.0 68.0
Roller 20 85 80 16 79.0 72.0 100 74.0 67.0
Sand Blasting (Single Nozzle) 20 85 96 9 79.0 72.0 100 90.0 83.0 Scraper 40 85 84 12 79.0 75.0 100 78.0 74.0
Shears (on backhoe) 40 85 96 5 79.0 75.0 100 90.0 86.0
Slurry Plant 100 78 78 1 72.0 72.0 100 72.0 72.0
Slurry Trenching Machine 50 82 80 75 76.0 73.0 100 74.0 71.0 Soil Mix Drill Rig 50 80 na 0 74.0 71.0 100
Tractor 40 84 na 0 78.0 74.0 100
Vacuum Excavator (Vac-truck) 40 85 85 149 79.0 75.0 100 79.0 75.0 Vacuum Street Sweeper 10 80 82 19 74.0 64.0 100 76.0 66.0 Ventilation Fan 100 85 79 13 79.0 79.0 100 73.0 73.0
Vibrating Hopper 50 85 87 1 79.0 76.0 100 81.0 78.0
Vibratory Concrete Mixer 20 80 80 1 74.0 67.0 100 74.0 67.0 Vibratory Pile Driver 20 95 101 44 89.0 82.0 100 95.0 88.0 Warning Horn 5 85 83 12 79.0 66.0 100 77.0 64.0
Welder / Torch 40 73 74 5 67.0 63.0 100 68.0 64.0
chipper 75
Source:

FHWA Roadway Construction Noise Model, January 2006. Table 9.1 U.S. Department of Transportation
CA/T Construction Spec. 721.560
Long-Term Noise Measurement Summary
KEY: Orange cells are for input.

Grey cells are intermediate calculations performed by the model.

Green cells are data to present in a written analysis (output).

Measurement Site: 241 Georgia Street, Vallejo CA
Measurement Date: 1/4/2024
Project Name: Elite Charter School
Day Evening Night Day Evening Night
0:00 51.5 141,254 0 0 1 0 0 141,254
1:00 58.3 676,083 0 0 1 0 0 676,083
2:00 53.7 234,423 0 0 1 0 0 234,423
3:00 48.7 74,131 0 0 1 0 0 74,131
4:00 52.6 181,970 0 0 1 0 0 181,970
5:00 56.5 446,684 0 0 1 0 0 446,684
6:00 65.1 3,235,937 0 0 1 0 0 3,235,937
7:00 62.7 1,862,087 1 0 0 1,862,087 0 0
8:00 65.2 3,311,311 1 0 0 3,311,311 0 0
9:00 62.7 1,862,087 1 0 0 1,862,087 0 0
10:00 60.3 1,071,519 1 0 0 1,071,519 0 0
11:00 63.3 2,137,962 1 0 0 2,137,962 0 0
12:00 61.9 1,548,817 1 0 0 1,548,817 0 0
13:00 64.1 2,570,396 1 0 0 2,570,396 0 0
14:00 63.0 1,995,262 1 0 0 1,995,262 0 0
15:00 62.5 1,778,279 1 0 0 1,778,279 0 0
16:00 62.8 1,905,461 1 0 0 1,905,461 0 0
17:00 62.0 1,584,893 1 0 0 1,584,893 0 0
18:00 60.2 1,047,129 1 0 0 1,047,129 0 0
19:00 62.3 1,698,244 0 1 0 0 1,698,244 0
20:00 58.1 645,654 0 1 0 0 645,654 0
21:00 63.2 2,089,296 0 1 0 0 2,089,296 0
22:00 59.4 870,964 0 0 1 0 0 870,964
23:00 52.7 186,209 0 0 1 0 0 186,209
Sum of Sound Power during Period wo/penalty 22,675,203 4,433,194 6,047,653 Log Factor for CNEL Penalty (i.e., 10*log(x)) 13 1 0
Sound Power during Period with penalty 22,675,203 13,299,582 60,476,532 Total Daily Sound Power, with penalties 96,451,317
Hours per Day 24
Average Hourly Sound Power, with penalties 4,018,805
CNE
L 66.0
Day Night Day Night
0 1 0 141,254
0 1 0 676,083
0 1 0 234,423
0 1 0 74,131
0 1 0 181,970
0 1 0 446,684
0 1 0 3,235,937
1 0 1,862,087 0
1 0 3,311,311 0
1 0 1,862,087 0
1 0 1,071,519 0
1 0 2,137,962 0
1 0 1,548,817 0
1 0 2,570,396 0
1 0 1,995,262 0
1 0 1,778,279 0
1 0 1,905,461 0
1 0 1,584,893 0
1 0 1,047,129 0
1 0 1,698,244 0
1 0 645,654 0
1 0 2,089,296 0
0 1 0 870,964
0 1 0 186,209
Sum of Sound Power during Period wo/penalty 27,108,397 6,047,653 Log Factor for Penalty (i.e., 10*log(x)) 11 0
Sound Power during Period with penalty 27,108,397 60,476,532 Total Daily Sound Power, with penalties 87,584,929
Hours per Day 24
Average Hourly Sound Power, with penalties 3,649,372
Ldn 65.6
Notes:

Log factors for the Ldn and CNEL penalties are provided in Table 2-12 on pg. 2-52 of Caltrans 2009.

Source:

Computation of Ldn
Ldn compu-
tation on next
page.

Computation of the CNEL based on 1-hour Leq measurements for each hour of a day are based on equation 2-27 on pg. 2-57 of Caltrans 2009.

Computation of the Ldn based on 1-hour Leq measurements for each hour of a day are based on equation 2-26 on pg. 2- 56 of Caltrans 2009.

California Deaprtment of Transportation (Caltrans), Divisiong of Environmental Analysis. 2009 (November). 2009 Technical Noise Supplement . Sacramento, CA. Available: <http://www.dot.ca.gov/hq/env/noise/>. Accessed September 24, 2010.

Period of 24-Hour
Day (1=included,
0=not)
Sound Power
Breakdown by
Period of Day
Computation of CNEL
Period of 24-Hour Day
(1=included, 0=not)
Sound
Power
=10*Log(dBA
/10)
Sound
Level Leq
(dBA)
Hour of
Day
(military
time)
Sound Power Breakdown by
Period of Day

Short-Term Noise Measurements
Number Start Date Start Time End Time Duration Meas Mode In put Range Input Type SPL Time Weight LN% Freq Weight ST 2 1/4/24 8:45:46 AM 9:00:46 AM 0:15:00 Single Low Mic Fast dBA ST 1 1/4/24 9:02:35 AM 9:17:35 AM 0:15:00 Single Low Mic Fast dBA ST 3 1/4/24 9:18:51 AM 9:33:51 AM 0:15:00 Single Low Mic Fast dBA Overload UnderRange Sensitivity LAeq LAFmax LAFmin LAF10% LAF50% LAF90% No No 23.49mV/Pa 55.5 70.1 45.1 58.9 51.8 48.4
No No 23.49mV/Pa 56.3 66.3 42.3 60.2 52.9 45.7
No No 23.49mV/Pa 59.4 78.8 48.1 63.1 53.6 50.9
Long-Term Noise Measurements
Number Start Date Start Time End Time Duration Meas Mode Input Range Input Type SPL Time Weight LN% Freq Weight Overload UnderRange Sensiti vity LAeq LAFmax LAFmin 1 5 1/4/24 10:00:00 AM 11:00:00 AM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 60.3 85.7 43.1 6 1/4/24 11:00:00 AM 12:00:00 PM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 63.3 92.4 45.6 7 1/4/24 12:00:00 PM 1:00:00 PM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 61.9 85.6 44.8 8 1/4/24 1:00:00 PM 2:00:00 PM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 64.1 85.7 44.4 9 1/4/24 2:00:00 PM 3:00:00 PM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 63 87.2 44 10 1/4/24 3:00:00 PM 4:00:00 PM 1:00:00 Auto Low Mic Fast dBA Yes No 18.02mV/Pa 62.5 90.4 45.5 11 1/4/24 4:00:00 PM 5:00:00 PM 1:00:00 Auto Low Mic Fast dBA Yes No 18.02mV/Pa 62.8 91 45 12 1/4/24 5:00:00 PM 6:00:00 PM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 62 85.1 44.1 13 1/4/24 6:00:00 PM 7:00:00 PM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 60.2 84.7 44.7 14 1/4/24 7:00:00 PM 8:00:00 PM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 62.3 86.7 43.7 15 1/4/24 8:00:00 PM 9:00:00 PM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 58.1 80.6 40.7 16 1/4/24 9:00:00 PM 10:00:00 PM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 63.2 88.4 39.5 17 1/4/24 10:00:00 PM 11:00:00 PM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 59.4 87.5 38.5 18 1/4/24 11:00:00 PM 12:00:00 AM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 52.7 76.1 37.7 19 1/5/24 12:00:00 AM 1:00:00 AM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 51.5 72.4 35.4 20 1/5/24 1:00:00 AM 2:00:00 AM 1:00:00 Auto Low Mic Fast dBA Yes No 18.02mV/Pa 58.3 97 34.3 21 1/5/24 2:00:00 AM 3:00:00 AM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 53.7 82.4 35.5 22 1/5/24 3:00:00 AM 4:00:00 AM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 48.7 70.6 35.6 23 1/5/24 4:00:00 AM 5:00:00 AM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 52.6 71.8 36.9 24 1/5/24 5:00:00 AM 6:00:00 AM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 56.5 74.6 40.5 25 1/5/24 6:00:00 AM 7:00:00 AM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 65.1 95.2 45.7 26 1/5/24 7:00:00 AM 8:00:00 AM 1:00:00 Auto Low Mic Fast dBA Yes No 18.02mV/Pa 62.7 90.6 46.5 27 1/5/24 8:00:00 AM 9:00:00 AM 1:00:00 Auto Low Mic Fast dBA Yes No 18.02mV/Pa 65.2 96.5 46.7 28 1/5/24 9:00:00 AM 10:00:00 AM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 62.7 91.4 46.6 29 1/5/24 10:00:00 AM 11:00:00 AM 1:00:00 Auto Low Mic Fast dBA No No 18.02mV/Pa 62.7 89.4 46.2 Traffic Noise Spreadsheet Calculator
Project:

Number Name From To
Summary of Net Changes
1 Sonoma Boulevard Florida Street Georgia Street 55.8 56.3 0.6 2 Sonoma Boulevard Georgia Street Curtola Parkway 59.1 59.2 0.1 3 Georgia Street Mare Island Way Santa Clara Street 51.4 52.5 1.1 4 Georgia Street Santa Clara Street Sacramento Street 49.6 50.9 1.2 5 Georgia Street Sacramento Street Sonoma Boulevard 52.2 52.9 0.7 6 Curtola Parkway/Mare Island Way Maine Street Sonoma Boulevard 60.7 61.1 0.5 7 Sacramento Street Georgia Street Maine Street 50.2 53.7 3.4 *All modeling assumes average pavement, level roadways (less than 1.5% grade), constant traffic flow and does not account for s hielding of any type or finite roadway adjustments. All levels are reported as A-weighted noise levels.

Segment Description and Location
Existing Conditions
Existing +
Project
Conditions
ȴ
džŝƐƚŝŶŐʹ
Existing +
Project
Existing Traffic Noise Spreadsheet Calculator
Project:

Noise Level Descriptor: Ldn
Site Conditions: Hard
Traffic Input: ADT
Traffic K-Factor:

Ldn,
Number Name From To (mph) Near Far % Auto % Medium % Heavy % Day % Eve % Night (dBA)5,6,7 75 dBA 70 dBA 65 dBA 60 dBA Existing Conditions
1 Sonoma Boulevard Florida Street Georgia Street 6,690 25 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 55.8 2 Sonoma Boulevard Georgia Street Curtola Parkway 9,820 30 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 59.1 3 Georgia Street Mare Island Way Santa Clara Street 1,150 35 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 51.4 4 Georgia Street Santa Clara Street Sacramento Street 1,620 25 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 49.6 5 Georgia Street Sacramento Street Sonoma Boulevard 2,910 25 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 52.2 6 Curtola Parkway/Mare Island Way Maine Street Sonoma Boulevard 9,640 35 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 60.7 7 Sacramento Street Georgia Street Maine Street 870 35 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 50.2 *All modeling assumes average pavement, level roadways (less than 1.5% grade), constant traffic flow and does not account for shielding of any type or finite roadway adjustments. All levels are reported as A-weighted noise levels. 16 4 12 37 116
1 Input
Speed Traffic Distribution Characteristics
Output
Distance to
Directional
Centerline, (feet)4
1 3
4 8
1 12
Distance to Contour, (feet)
3 25
1 1
38 81
14 11
39 Segment Description and Location
ADT
26 4
3 Existing + Project Traffic Noise Spreadsheet Calculator Project:

Noise Level Descriptor: Ldn
Site Conditions: Hard
Traffic Input: ADT
Traffic K-Factor:

Ldn,
Number Name From To (mph) Near Far % Auto % Medium % Heavy % Day % Eve % Night (dBA)5,6,7 70 dBA 65 dBA 60 dBA 55 dBA Existing + Project Conditions
1 Sonoma Boulevard Florida Street Georgia Street 7,600 25 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 56.3 2 Sonoma Boulevard Georgia Street Curtola Parkway 10,040 30 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 59.2 3 Georgia Street Mare Island Way Santa Clara Street 1,470 35 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 52.5 4 Georgia Street Santa Clara Street Sacramento Street 2,160 25 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 50.9 5 Georgia Street Sacramento Street Sonoma Boulevard 3,450 25 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 52.9 6 Curtola Parkway/Mare Island Way Maine Street Sonoma Boulevard 10,780 35 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 61.1 7 Sacramento Street Georgia Street Maine Street 1,920 35 100 100 97.0% 2.0% 1.0% 80.0% 15.0% 5.0% 53.7 *All modeling assumes average pavement, level roadways (less than 1.5% grade), constant traffic flow and does not account for shielding of any type or finite roadway adjustments. All levels are reported as A-weighted noise levels. 2 7 23 73
13 41 130 412
2 6 18 56
1 4 12 39
8 26 83 261
2 6 19 62
Segment Description and Location Distance to Contour, (feet)3 4 14 43 136
Input Output
ADT
Speed
Distance to
Directional
Centerline, (feet)4 Traffic Distribution Characteristics Roadway From To AM PM AM-Derived PM-Derived AM PM AM-Derived PM-Derived Sonoma Boulevard Florida Street Georgia Street 669 1216 6,690 12,160 760 1274 7,600 12,740 Sonoma Boulevard Georgia Street Curtola Parkway 576 982 5,760 9,820 628 1004 6,280 10,040 Georgia Street Mare Island Way Santa Clara Street 115 183 1,150 1,830 147 199 1,470 1,990 Georgia Street Santa Clara Street Sacramento Street 162 233 1,620 2,330 216 264 2,160 2,640 Georgia Street Sacramento Street Sonoma Boulevard 226 291 2,260 2,910 265 345 2,650 3,450 Curtola Parkway Maine Street Sonoma Boulevard 964 1174 9,640 11,740 1078 1119 10,780 11,190 Sacramento Street Georgia Street Maine Street 87 109 870 1,090 192 153 1,920 1,530 K-Factor
K-Factor 10

1. K-Factor represents proportion of peak-hour volumes to ADT volumes EXISTING CONDITIONS EXISTING + PROJECT
Peak Hour Segment Total ADT1 Peak Hour Segment Total ADT1 Study Int # N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 Sonoma Boulevard Florida Street 29 339 12 36 275 39 43 49 25 8 57 25 14 666 9 51 505 69 97 49 25 14 57 52 2 Mare Island Way Georgia Street 16 587 9 39 429 3 12 4 5 14 11 36 32 579 14 51 425 5 31 20 15 20 16 111 3 S a n t a C l a r a S t r e e t G e o r g i a S t r e e t 8 3 31 22 13 0 3 4 3 71 22 55 21 52 74 62 23 03 71 51 37 71 01 05 63 8 4 S a c r a m e n t o S t r e e t G e o r g i a S t r e e t 2 5 3 2 54 8 8 9 5 4 7 8 8 41 91 24 71 42 25 91 41 9 1 0 55 1 57 82 3 5 Sonoma Boulevard Georgia Street 13 282 11 39 234 32 10 65 12 35 99 69 25 565 41 89 367 38 33 122 17 18 87 74 6 Mare Island Way Maine Street 2 606 36 68 371 34 24 2 515 28 60 457 42 47 7 Maine Street Sacramento Street 32 6 11 33 38 13 40 13 9 69 49 21 8 Sonoma Boulevard Curtola Parkway 211 144 7 147 73 10 338 101 434 151 253 380 29 215 148 16 406 128 337 200 Study Int # N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 Sonoma Boulevard Florida Street 29 5 51 6 2 34 5 20 2 1 2 Mare Island Way Georgia Street 4 14 14 1 4 3 6 5 5
3 Santa Clara Street Georgia Street 4 6 20 8 1 26 2 3 4 13 5 11 2 4 Sacramento Street Georgia Street 22 4 28 22 58 1 2 5 9 8 2 18 9 27 5 S o n o m a B o u l e v a r d G e o r g i a S t r e e t 9 2 3 1 3 2 0 2 7 1 1989 3 5 5 2 1 8 7 1 1 1 5 1 5 46 1 1 6 Mare Island Way Maine Street 14 1 1 4 6 1 3
7 Maine Street Sacramento Street 15 2 19 1 9 13
8 S o n o m a B o u l e v a r d C u r t o l a P a r k w a y 79 1 1 1 1 1 16 32 78 21 33 Study Int # N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 Sonoma Boulevard Florida Street 29 368 17 36 326 39 43 49 25 14 59 25 14 700 14 51 525 69 97 49 25 16 58 52 2 Mare Island Way Georgia Street 16 591 23 53 430 3 12 4 5 14 11 40 32 582 20 56 425 5 31 20 15 20 16 116 3 Santa Clara Street Georgia Street 12 39 32 29 31 3 4 63 14 25 52 15 30 50 35 35 37 15 13 88 10 10 58 38 4 S a c r a m e n t o S t r e e t G e o r g i a S t r e e t 0 2 5 3 2 57 0 8 1 38 22 96 68 42 01 45 22 32 26 71 42 1 1 2 3 1 44 27 82 3 5 Sonoma Boulevard Georgia Street 22 305 24 39 254 59 21 74 20 44 134 69 30 586 49 89 374 49 48 137 21 24 98 74 6 M a r e I s l a n d W a y M a i n e S t r e e t 2 6 2 0 3 7 6 9 3 7 1 0000 3 4 0 2 8 2 5 2 1 2 8 6 0 4 5 7 0000 4 3 0 5 0 7 Maine Street Sacramento Street 0 0 0 32 0 21 13 33 0 0 57 14 0 0 0 40 0 22 9 69 0 0 62 21 8 Sonoma Boulevard Curtola Parkway 218 153 7 158 84 10 0 338 101 0 445 157 256 382 29 222 156 16 0 408 129 0 340 203 Study Int # N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 Sonoma Boulevard Florida Street 30 340 20 40 280 40 50 50 30 10 60 30 20 670 10 60 510 70 100 50 30 20 60 60 2 Mare Island Way Georgia Street 20 590 10 40 430 10 20 10 10 20 20 40 40 580 20 60 430 10 40 20 20 20 20 120 3 Santa Clara Street Georgia Street 10 40 20 30 30 10 10 40 20 30 60 20 30 50 30 30 40 20 20 80 10 10 70 40 4 Sacramento Street Georgia Street 30 10 30 50 10 10 70 10 10 90 20 20 50 20 30 60 20 20 110 10 20 80 30 5 Sonoma Boulevard Georgia Street 20 290 20 40 240 40 10 70 20 40 100 70 30 570 50 90 370 40 40 130 20 20 90 80 6 Mare Island Way Maine Street 10 610 40 70 380 40 30 10 520 30 60 460 50 50 7 Maine Street Sacramento Street 40 10 20 40 40 20 40 20 10 70 50 30 8 Sonoma Boulevard Curtola Parkway 220 150 10 150 80 10 340 110 440 160 260 380 30 220 150 20 410 130 340 200 Study Int # N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 Sonoma Boulevard Florida Street 30 369 25 40 331 40 50 50 30 16 62 30 20 704 15 60 530 70 100 50 30 22 61 60 2 Mare Island Way Georgia Street 20 594 24 54 431 10 20 10 10 20 20 44 40 583 26 65 430 10 40 20 20 20 20 125 3 Santa Clara Street Georgia Street 14 46 40 38 31 10 10 66 22 30 60 20 33 54 43 35 40 20 20 91 10 10 72 40 4 S a c r a m e n t o S t r e e t G e o r g i a S t r e e t 0 3 01 03 07 21 01 49 83 26 89 02 12 25 52 93 06 82 02 2 1 2 8 1 94 78 03 0 5 Sonoma Boulevard Georgia Street 29 313 33 40 260 67 21 79 28 49 135 70 35 591 58 90 377 51 55 145 24 26 101 80 6 M a r e I s l a n d W a y M a i n e S t r e e t 1 0 6 2 4 4 1 7 1 3 8 0 0000 4 0 0 3 4 1 0 5 2 6 3 0 6 0 4 6 0 0000 5 1 0 5 3 7 M a i n e S t r e e t S a c r a m e n t o S t r e e t 0 0 0 4 0 0 2 52 24 0 0 0 5 92 1 0 0 0 4 0 0 2 91 07 0 0 0 6 33 0 8 Sonoma Boulevard Curtola Parkway 227 159 10 161 91 10 0 340 110 0 451 166 263 382 30 227 158 20 0 412 131 0 343 203 Study Int # N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 Sonoma Boulevard Florida Street 40 380 20 40 310 50 50 60 30 10 70 30 20 740 10 60 560 80 110 60 30 20 70 60 2 Mare Island Way Georgia Street 20 740 20 50 540 10 20 10 10 20 20 40 40 730 20 70 540 10 40 30 20 30 20 130 3 Santa Clara Street Georgia Street 10 40 20 30 40 10 10 50 20 30 60 20 30 60 30 40 50 20 20 90 20 20 70 50 4 Sacramento Street Georgia Street 30 10 30 60 10 10 80 10 10 100 30 20 60 20 30 70 20 30 120 10 20 90 30 5 Sonoma Boulevard Georgia Street 20 310 20 50 260 40 20 80 20 40 110 80 30 630 50 100 410 50 40 140 20 20 100 90 6 M a r e I s l a n d W a y M a i n e S t r e e t 1 0 7 6 0 5 0 9 0 4 7 0 0000 4 0 0 3 0 1 0 6 5 0 4 0 8 0 5 8 0 0000 5 0 0 6 0 7 M a i n e S t r e e t S a c r a m e n t o S t r e e t 0 0 0 4 0 0 1 02 04 0 0 0 5 02 0 0 0 0 5 0 0 2 01 08 0 0 0 6 03 0 8 Sonoma Boulevard Curtola Parkway 240 160 10 170 90 20 0 380 120 0 480 170 280 420 40 240 170 20 450 150 370 220 Study Int # N/S St E/W ST NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR EBL EBT EBR WBL WBT WBR 1 Sonoma Boulevard Florida Street 40 409 25 40 361 50 50 60 30 16 72 30 20 774 15 60 580 80 110 60 30 22 71 60 2 Mare Island Way Georgia Street 20 744 34 64 541 10 20 10 10 20 20 44 40 733 26 75 540 10 40 30 20 30 20 135 3 Santa Clara Street Georgia Street 14 46 40 38 41 10 10 76 22 30 60 20 33 64 43 45 50 20 20 101 20 20 72 50 4 Sacramento Street Georgia Street 0 30 10 30 82 10 14 108 32 68 100 31 22 65 29 30 78 20 32 138 19 47 90 30 5 Sonoma Boulevard Georgia Street 29 333 33 50 280 67 31 89 28 49 145 80 35 651 58 100 417 61 55 155 24 26 111 90 6 M a r e I s l a n d W a y M a i n e S t r e e t 1 0 7 7 4 5 1 9 1 4 7 0 0000 4 0 0 3 4 1 0 6 5 6 4 0 8 0 5 8 0 0000 5 1 0 6 3 7 M a i n e S t r e e t S a c r a m e n t o S t r e e t 0 0 0 4 0 0 2 52 24 0 0 0 6 92 1 0 0 0 5 0 0 2 91 08 0 0 0 7 33 0 8 Sonoma Boulevard Curtola Parkway 247 169 10 181 101 20 0 380 120 0 491 176 283 422 40 247 178 20 0 452 151 0 373 223 Existing Balanced AM Peak PM Peak
Project Trips Balanced AM Peak PM Peak
Existing Plus Project AM Peak PM Peak
Opening Year AM Peak PM Peak
Cumulative + Project AM Peak PM Peak
Opening Year + Project AM Peak PM Peak
Cumulative AM Peak PM Peak
Citation # Citations
1 Caltrans Technical Noise Supplement. 2009 (November). Table (5-11), Pg 5-60. Caltrans Technical Noise Supplement. 2013 (September). Table (4-2), Pg 4-17. 2 Caltrans Technical Noise Supplement. 2009 (November). Equation (5-26), Pg 5-60. Caltrans Technical Noise Supplement. 2013 (September). Equation (4-5), Pg 4-17. 3 Caltrans Technical Noise Supplement. 2009 (November). Equation (2-16), Pg 2-32. FHWA 2004 TNM Version 2.5 4 Caltrans Technical Noise Supplement. 2009 (November). Equation (5-11), Pg 5-47, 48. FHWA 2004 TNM Version 2.5 5 Caltrans Technical Noise Supplement. 2009 (November). Equation (2-26), Pg 2-55, 56. Caltrans Technical Noise S upplement. 2013 (September). Equation (2-23), Pg 2-51, 52. 6 Caltrans Technical Noise Supplement. 2009 (November). Equation (2-27), Pg 2-57. Caltrans Technical Noise Supplement. 2013 (September). Equation (2-24), Pg 2-53. 7 Caltrans Technical Noise Supplement. 2009 (November). Pg 2-53. Caltrans Technical Noise Supplement. 2013 (September). Pg 2-57. 8 Caltrans Technical Noise Supplement. 2009 (November). Equation (5-7), Pg 5-45. FHWA 2004 TNM Version 2.5 9 Caltrans Technical Noise Supplement. 2009 (November). Equation (5-8), Pg 5-45. FHWA 2004 TNM Version 2.5 10 Caltrans Technical Noise Supplement. 2009 (November). Equation (5-9), Pg 5-45. FHWA 2004 TNM Version 2.5 11 Caltrans Technical Noise Supplement. 2009 (November). Equation (5-13), Pg 5-49. FHWA 2004 TNM Version 2.5 12 Caltrans Technical Noise Supplement. 2009 (November). Equation (5-14), Pg 5-49. FHWA 2004 TNM Version 2.5 13 Federal Highway Administration Traffic Noise Model Technical Manual. Report No. FHWA-PD-96-010. 1998 (January). Equation (16) , Pg 67 14 Federal Highway Administration Traffic Noise Model Technical Manual. Report No. FHWA-PD-96-010. 1998 (January). Equation (20) , Pg 69 15 Federal Highway Administration Traffic Noise Model Technical Manual. Report No. FHWA-PD-96-010. 1998 (January). Equation (18) , Pg 69 References
California Department of Transportation (Caltrans). 2009 (November). Technical Noise S upplement. Available: http://www.dot.ca.gov/hq/env/noise/pub/tens_complete.pdf. Accessed August 17, 2017.

California Department of Transportation (Caltrans). 2013 (September). Te chnical Noise Supplement. Available: http://www.dot.ca.gov/hq/env/noise/pub/TeNS_Sept_2013A.pdf. Accessed August 17, 2017.

Federal Highway Administration. 2004. Traffic Noise Model Version 2.5. Available: https://www.fhwa.dot.gov/environment/noise/tr affic_noise_model/tnm_v25/. Accessed August 17, 2017.

Noise and Vibration Study - Elite Charter School Project

Source: Ascent 2024.

Long-Term Noise Measurement.

Noise and Vibration Study - Elite Charter School Project

Source: Ascent 2024.

Short-Term Noise Measurement #1.

Noise and Vibration Study - Elite Charter School Project

Source: Ascent 2024.

Short-Term Noise Measurement #2.

Noise and Vibration Study - Elite Charter School Project

Source: Ascent 2024.

Short-Term Noise Measurement #3.

Memo
455 Capitol Mall, Suite 300
Sacramento, CA 95814
916.444.7301

Date: February 21, 2024
To: Christina Ratcliffe, Planning and Development Services Director, City of Vallejo CC: Erwin Ordonez, Interwest
From: Alta Cunningham, M.A. Historic Preservation, Dimitri Antoniou, Ascent Environmental Subject: Historical Resources Study - 241-255 Georgia Street in Vallejo, CA Class 32 Exemption

INTRODUCTION AND PURPOSE
Ascent Environmental has been retained to prepare technical memos in support of a California Environmental Quality Act (CEQA) Class 32 Categorical Exemption for the Elite Charter School Project, (project), located in the City of Vallejo, California. Section 15332 of the State CEQA Guidelines allows for the use of a categorical exemption for infill development, provided the contemplated development meets certain criteria, and that none of the exceptions to the exemptions apply (CEQA Guidelines Section 15300.2). This includes not causing a substantial adverse change in the significance of a historical resource; this includes both built environment features and archaeological sites. This memo addresses the project’s potential to affect historical resources.

PROJECT DESCRIPTION AND ENVIRONMENTAL SETTING
The project site is located at 241-255 Georgia Street on Assessor’s Parcel Number (APN) 0055-170-390 in Vallejo, California. The project site is bounded by an existing commercial development to the west, Georgia Street to the north, Sacramento Street to the east, and an existing parking lot and Vallejo Transit Center to the south. The project site is currently occupied by a two-story building.

The proposed project would provide a new public charter high school that would accommodate a maximum of 400 students and 35 staff. The proposed project would be completed in phases as the school continues to grow enrollment and additional funds for construction become available. The existing structure would not be demolished but internal improvements would be made to reconfigure the building layout. The initial development phase proposes to develop approximately 18,000 square feet of interior space suitable for 13 classrooms, four offices, bathroom facilities, a serving kitchen, a multi-purpose room, a library alcove, and a future gymnasium on the ground floor. The second development phase proposes to develop five additional classrooms, storage areas, restrooms, a conference room, and four private offices on the second floor. The proposed project would also include development of perimeter fencing for security purposes, school signage, the reconfiguration of 16 parking spaces into eight parking spaces along Sacramento Street, as well as the addition of 36 bicycle parking spaces. The proposed project improvements would be ADA accessible and comply with State design and construction standards.

Final Historical Resources Study - 241-255 Georgia Street February 21. 2024

Page 2 ends

REGULATIONS PERTAINING TO HISTORICAL RESOURCES
California Environmental Quality Act
CEQA requires public agencies to consider the effects of their actions on “historical resources.” Pursuant to Public Resources Code (PRC) Section 21084.1, a “project that may cause a substantial adverse change in the significance of an historical resource is a project that may have a significant effect on the environment.” “Historical resource” is a term with a defined statutory meaning (PRC Section 21084.1; State CEQA Guidelines Sections 15064.5[a] and [b]).

Under State CEQA Guidelines Section 15064.5(a), historical resources include the following:
1) A resource listed in, or determined to be eligible by the State Historical Resources Commission for listing in, the CRHR (PRC Section 5024.1).
2) A resource included in a local register of historical resources, as defined in PRC Section 5020.1(k) or identified as significant in a historical resource survey meeting the requirements of PRC Section 5024.1(g), will be presumed to be historically or culturally significant. Public agencies must treat any such resource as significant unless the preponderance of evidence demonstrates that it is not historically or culturally significant. 3) Any object, building, structure, site, area, place, record, or manuscript that a lead agency determines to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California may be considered to be a historical resource, provided the lead agency’s determination is supported by substantial evidence in light of the whole record. Generally, a resource will be considered by the lead agency to be historically significant if the resource meets the criteria for listing in the CRHR (PRC Section 5024.1).
4) The fact that a resource is not listed in or determined to be eligible for listing in the CRHR, not included in a local register of historical resources (pursuant to PRC Section 5020.1[k]), or identified in a historical resources survey (meeting the criteria in PRC Section 5024.1[g]) does not preclude a lead agency from determining that the resource may be a historical resource as defined in PRC Sections 5020.1(j) or 5024.1.

California Register of Historical Resources
The CRHR is a listing of State of California resources that are significant in the context of California’s history. Resources listed in the National Register of Historic Places (NRHP) is automatically listed in the CRHR. A historical resource must be significant at the local, state, or national level under one or more of the criteria defined in the California Code of Regulations Title 15, Chapter 11.5, Section 4850 to be included in the CRHR. The CRHR criteria are tied to CEQA because any resource that meets the criteria below is considered a significant historical resource under CEQA.

The CRHR uses four evaluation criteria:

Criterion 1. Is associated with events that have made a significant contribution to the broad patterns of local or regional history, or the cultural heritage of California or the United States.

Criterion 2. Is associated with the lives of persons important to local, California, or national history.

Criterion 3. Embodies the distinctive characteristics of a type, period, region, or method of construction; represents the work of a master; or possesses high artistic values.

Criterion 4. Has yielded, or has the potential to yield, information important to the prehistory or history of the local area, California, or the nation.

A historical resource must meet one of the above criteria and retain integrity to be listed in the CRHR. For a property to retain and convey historic integrity it must possess most of the seven aspects of integrity: location, design, setting, materials, workmanship, feeling, and association. Location is the place where the historic property was constructed or the place where a historic event occurred. Integrity of location refers to whether the property has been moved since Final Historical Resources Study - 241-255 Georgia Street February 21. 2024

Page 3 ends

its construction. Design is the combination of elements that create the form, plan, space, structure, and style of a property. Setting is the physical environment of a historic property that illustrates the character of the place. Materials are the physical elements that were combined or deposited during a particular period of time and in a particular pattern or configuration to form a historic property. Workmanship is the physical evidence of the crafts of a particular culture or people during any given period in history or prehistory. Feeling is a property’s expression of the aesthetic or historic sense of a particular period of time. This is an intangible quality evoked by physical features that reflect a sense of a past time and place. Association is the direct link between the important historic event or person and a historic property. Continuation of historic use and occupation help maintain integrity of association.

City of Vallejo Municipal Code
Chapter 2.48 of the City of Vallejo Municipal Code establishes the Architectural Heritage and Landmarks Commission, a seven-member group appointed by the City Council. The Commission is charged with:
 Conducting design review and holding public hearings for restoration, remodeling, demolition, and development projects, which take place within the city's designated historic districts, or which affect city landmarks, using the standards of the Secretary of Interior’s Standards for the Treatment of Historic Properties or City policy as criteria for determining the historic and aesthetic appropriateness of proposed improvements.  Surveying the older buildings and neighborhoods to identify those structures which have historic and/or architectural significance, and designating buildings, sites and objects of particular historic or architectural significance as City landmarks.
 Making policy recommendations to the City Council on matters which relate to historic preservation and the restoration of the designed districts.

Chapter 16.38 of the Municipal Code codifies the City's goals and policies regarding historic preservation. The purpose of the Architectural Heritage and Historic Preservation Ordinance is to:
 Designate, preserve, protect, enhance and perpetuate those historic buildings, structures, landscaping, districts and neighborhoods which contribute to the cultural and aesthetic heritage of Vallejo.  Foster civic pride in the beauty and accomplishments of the past.  Stabilize and improve the economic values of certain historic buildings, structures, landscaping, districts and neighborhoods.
 Protect and enhance the city's cultural and aesthetic heritage.  Recognize the uniqueness of historic resources on Mare Island that have contributed to the history of Vallejo, California and the United States and that have significant value to the economic development and land use goals for the island and the community.
 Promote and encourage continued private ownership, where appropriate, and utilization of such buildings and other structures now so owned and used, to the extent that the objectives listed above can be obtained under such policy.

Structures, objects, and areas in Vallejo having special historical, cultural, architectural or aesthetic interest or value may be classified as one of the following (16.38.160):
 City Landmark. City landmarks shall include those structures found to have unique historical, architectural or aesthetic interest or value and which are eligible for or listed on the National Register of Historic Places.  Historic Structure. Historic structures shall include those structures found to have outstanding historical, architectural or aesthetic interest or value.

Final Historical Resources Study - 241-255 Georgia Street February 21. 2024

Page 4 ends

 Structure of Merit. Structures of merit shall include those structures found to have significant historical, architectural or aesthetic interest or value.
 Contributing Structure. Contributing structures shall include those structures found to warrant special historical, architectural or aesthetic interest or value.

Designation of a resource as a City landmark, historic structure, structure of merit, or contributing structure is based on the following criteria (16.38.150):
 Architectural Merit:
 Property that is the first, last, only, or most significant architectural property of its type in the city or region.  Property that is the prototype of, or outstanding example of, periods, styles, architectural movements, engineering or construction techniques, or an example of the more notable work, or of the best surviving work in the city or region of an architect, designer or master builder.  Architectural examples worth preserving for the values they add when integrated into the total fabric of the city's neighborhoods.
 Cultural Value: Structures, objects, sites and areas associated with the movement or evolution or religious, cultural, governmental, social and economic developments of the city;  Educational Value: Structures worth preserving for their educational value;  Historical Value:
 Preservation and enhancement of structures, objects, sites and areas that embody and express the history of Vallejo, Solano County, California, or the United States.  History may be social, cultural, economic, political, religious or military;  Any property which is listed in the National Register of Historic Places and as described in Section 470a of Title 16 of the United States Code and/or is a registered state landmark.

EXEMPTIONS UNDER CEQA
Section 15332 of the CEQA Guidelines allows for the use of a Class 32 Categorical Exemption, provided the contemplated development meets certain criteria:
(a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. (b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses.
(c) The project site has no value as habitat for endangered, rare or threatened species. (d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.
(e) The site can be adequately served by all required utilities and public services.

Final Historical Resources Study - 241-255 Georgia Street February 21. 2024

Page 5 ends

A lead agency must also consider whether a project may fall under a list of exceptions to all classes of exemptions, as detailed under Section 15300.2 of the CEQA Guidelines:
(a) Location. Classes 3, 4, 5, 6, and 11 are qualified by consideration of where the project is to be located -a project that is ordinarily insignificant in its impact on the environment may in a particularly sensitive environment be significant. Therefore, these classes are considered to apply in all instances, except where the project may impact on an environmental resource of hazardous or critical concern where designated, precisely mapped, and officially adopted pursuant to law by federal, state, or local agencies. (b) Cumulative Impact. All exemptions for these classes are inapplicable when the cumulative impact of successive projects of the same type in the same place, over time is significant. (c) Significant Effect. A categorical exemption shall not be used for an activity where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances. (d) Scenic Highways. A categorical exemption shall not be used for a project which may result in damage to scenic resources, including but not limited to, trees, historic buildings, rock outcroppings, or similar resources, within a highway officially designated as a state scenic highway. This does not apply to improvements which are required as mitigation by an adopted negative declaration or certified EIR. (e) Hazardous Waste Sites. A categorical exemption shall not be used for a project located on a site which is included on any list compiled pursuant to Section 65962.5 of the Government Code. (f) Historical Resources. A categorical exemption shall not be used for a project which may cause a substantial adverse change in the significance of a historical resource.

ANALYSIS
On January 18, 2024, a records search of the project site and a 0.25-mile buffer was conducted at the Northwest Information Center (NWIC), at Sonoma State University (NWIC File No.: 23-0811; Attachment A). The following information was reviewed as part of the records search:
 NRHP and CRHR,
 Historic Property Data File for Marin County,
 Archaeological Determinations of Eligibility,
 California Inventory of Historic Resources,
 California State Historic Landmarks,
 California Points of Historical Interest, and
 Historical GLO land plat maps.

The results of the records search review revealed that two previous studies of cultural resources have been conducted within the project site and that an additional five cultural resources studies have been completed for lands within a

0.25-mile radius. The two studies that cover the project site were conducted between 2000 and 2010; both address archaeological and built-environment topics and included subsurface testing. The reports conclude that there is potential to encounter subsurface historic-era archaeological deposits (e.g., bottles, refuse, building foundations), however, the potential for pre-contact archaeological deposits (e.g., lithics, stone tools, shells, beads) was low due to the location of the project site being in an upland area away from fresh water sources and exposed to the wind (Beard 2008; Chattan 2004).

Final Historical Resources Study - 241-255 Georgia Street February 21. 2024

Page 6 ends

The NWIC records search also revealed that no built environment features or archaeological sites have been previously recorded within the project site. One archaeological site and two built environment features were identified within the 0.25-mile radius.

Additionally, the project site is located south of the NRHP-listed Saint Vincent's Hill Historic District and west of the NRHP-listed Architectural Heritage District. The building is not listed as a City of Vallejo Landmark (City of Vallejo 2016:

4.4-8 through 4.4-14). Although the building has not been evaluated for CRHR-eligibility, it is possible that it could be recommended eligible later. As described above, eligibility rests on twin factors of significance and integrity. The project does not have the potential to result in adverse changes to the integrity of the building, such as would render it ineligible for listing. The project does not include demolishing the existing structure or altering external features of the building. ADA improvements, changes to the parking layout, perimeter fencing, and internal design changes would not affect integrity of location, design, setting, materials, workmanship, feeling, or association, as described above.

CONCLUSION
The building at 241-255 Georgia Street is not listed on the CRHR or as a City of Vallejo Landmark. The project does not have the potential to cause a substantial adverse change in the significance of a historical resource if the building was ever recommended eligible for listing as either a landmark or CRHR.

There are no known archeological or tribal cultural resources on the site that qualify as historical resources, according to readily available material. Given that the property has been previously disturbed, the likelihood of finding such resources intact and within their relevant historic context is relatively low. Although not required to support an infill exemption or an SB 330 application, the project would comply with Public Resources Code and Health and Safety Code requirements that protect unanticipated cultural discoveries.

Public Resources Code section 21083.2 requires that if a unique archaeological resource is discovered, reasonable efforts be made to permit any or all of these resources to be preserved in place or left in an undisturbed state.

Examples of appropriate treatment, in no order of preference, may include, but are not limited to, the following:
 Planning construction to avoid archaeological sites.
 Deeding archaeological sites into permanent conservation easements.  Capping or covering archaeological sites with a layer of soil before building on the sites.  Planning parks, greenspace, or other open space to incorporate archaeological sites.

To the extent that unique archaeological resources are discovered and preservation in place is not feasible, an archeologist would determine an appropriate treatment plan, which could include excavation.

Health & Safety Code section 7050.5 states:

In the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent remains until the coroner of the county in which the human remains are discovered has determined, in accordance with Chapter 10 (commencing with Section 27460) of Part 3 of Division 2 of Title 3 of the Government Code, that the remains are not subject to the provisions of Section 27491 of the Government Code or any other related provisions of law concerning investigation of the circumstances, manner and cause of any death, and the recommendations concerning the treatment and disposition of the human remains have been made to the person responsible for the excavation, or to his or her authorized representative, in the manner provided in Section 5097.98 of the Public Resources Code. The coroner shall make his or her determination within two working days from the time the person responsible for the excavation, or his or her authorized representative, notifies the coroner of the discovery or recognition of the human remains. If the coroner determines that the Final Historical Resources Study - 241-255 Georgia Street February 21. 2024

Page 7 ends

remains are not subject to his or her authority and if the coroner recognizes the human remains to be those of a Native American, or has reason to believe that they are those of a Native American, he or she shall contact, by telephone within 24 hours, the Native American Heritage Commission.

Public Resources Code section 5097.98 sets for the requirements for the NAHC when it receives notice from the coroner of the discovery of Native American human remains. It also includes requirements for the landowner, which include:

Upon the discovery of the Native American remains, the landowner shall ensure that the immediate vicinity, according to generally accepted cultural or archaeological standards or practices, where the Native American human remains are located, is not damaged or disturbed by further development activity until the landowner has discussed and conferred, as prescribed in this section, with the most likely descendants regarding their recommendations, if applicable, taking into account the possibility of multiple human remains. The landowner shall discuss and confer with the descendants all reasonable options regarding the descendants’ preferences for treatment.

The above existing laws, which the project applicant must follow in accordance with standard conditions of approval, would prevent significant impacts from project construction on unique archeological resources and human remains.

Therefore, the project would not result in any impacts to historical resources, and this exception to the exemption in Section 15332 does not apply.

REFERENCES
City of Vallejo. 2016 (July) Propel Vallejo General Plan Update and Sonoma Boulevard Specific Plan Draft EIR.

Prepared by Placeworks. Available: https://cdnsm5-
hosted.civiclive.com/Userfiles/DBFiles/server_16925367/202108/17961506.pdf Beard, Vicki R. 2008 (September). Historic Property Survey Report: Downtown Vallejo Streetscape Project, Solano County, California. CONFIDENTIAL Report S-035474 on file at the Northwest Information Center at Sonoma State University.

Chattan, Cassandra. 2004 (July). Downtown Vallejo Specific Plan Historic Resources Assessment. CONFIDENTIAL Report S-028998 on file at the Northwest Information Center at Sonoma State University.

PERSONNEL QUALIFICATIONS
Alta Cunningham has over 23 years of experience in the environmental consulting field. Her experience as an architectural historian includes archival research, historic building and structure surveys and evaluations, evaluating projects for consistency with the Secretary of the Interior’s Standards, and cultural resources documentation for National Environmental Policy Act and CEQA projects ranging from single building evaluations to district-wide surveys for CEQA, PRC Section 5024, and Section 106 compliance documents. Alta received her Bachelor of Science in History from the University of California, Davis, and a Master of Arts in Historic Preservation from the Savannah College of Art and Design. She meets the Secretary of the Interior’s Professional Qualification Standards for architectural history and history. Alta also meets the Office of Historic Preservation’s professional qualifications as an Archaeological Technician.

Final Historical Resources Study - 241-255 Georgia Street February 21. 2024

Page 8 ends

This page intentionally left blank.

Attachment A
NWIC Results Letter

CITY OF VALLEJO PLANNING COMMISSION

RESOLUTION NO. PC 24-04

A RESOLUTION APPROVING MAJOR USE PERMIT (UP22-0008)

ALLOWING THE OPERATION OF A NEW PUBLIC CHARTER HIGH SCHOOL WITH AN ENROLLMENT OF UP TO 400 STUDENTS IN AN EXISTING TWO-STORY BUILDING AT 241-255 GEORGIA STREET (APN:0055-170-390) AND

FINDING THE PROJECT CATEGORICALLY EXEMPT FROM ENVIRONMENTAL

REVIEW UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO CEQA GUIDELINES SECTION 15332 (CLASS 32: IN-FILL

PROJECTS)

*********************************************************

I. GENERAL FINDINGS

WHEREAS, on August 29, 2017, the City Council adopted General Plan 2040 which serves as a guide for the community’s future growth and development; and

WHEREAS, the Major Use Permit approval is being requested for property that has a General Plan 2040 Land Use Designation of District – Downtown Waterfront (D-D/W); and

WHEREAS, on July 22, 2021, the City Council adopted the Zoning Code and Zoning Map to implement General Plan 2040‘s Land Use Plan; and

WHEREAS, the property is located in the Downtown Mixed Use (DMX) Zoning District; and

WHEREAS, on July 7, 2022, Elite Public Schools submitted an application for a Major Use Permit to allow the operation of a new public charter high school with an enrollment of up to 400 students in an existing two-story building at 241-255 Georgia Street; and

WHEREAS, on August 11, 2023, the application was determined to be complete; and

WHEREAS, on March 18, 2024, the City of Vallejo Planning Commission held a duly noticed public hearing; and

WHEREAS, the Planning Commission considered testimony and evidence, both written and oral, provided at the public hearing, as well as other documents contained in the record of proceedings relating to the Project, which are maintained in the offices of the City of Vallejo Planning Division; and

WHEREAS, based on evidence received in the staff report and at the public hearing, the Planning Commission makes the following factual findings:

ATTACHMENT 1

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

II. CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDING

Following a review of the project, the Planning Commission has determined that it is exempt from the California Environmental Quality Act (CEQA) requirements. The project is exempt from environmental review under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15332 (Class 32: In-fill Projects) because the project is on a site of less than 5 acres within city limits surrounded by urban uses, is consistent with the applicable general plan designation and all applicable general plan policies as well as with the applicable zoning designation and regulations, has no value as habitat for endangered, rare or threatened species, is adequately served by all required utilities and public services, and approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. Further, none of the exceptions pursuant to Section 15300.2 of the CEQA Guidelines apply, in that
a. The project is located on an in-fill site and there are no environmental resource of hazardous or critical concern where designated, precisely mapped, and officially adopted pursuant to law by federal, state, or local agencies; and b. There is no cumulative impact in that this is the only type of this use in this area; and
c. There is no reasonable possibility that the renovation of an empty office building will have a significant effect on the environment as there are no unusual circumstances associated with this downtown in-fill site; and d. There will be no damage to scenic resources, including but not limited to, trees, historic buildings, rock outcroppings, or similar resources, within a highway officially designated as a state scenic highway, as the location is not near a scenic highway.

III. FINDINGS RELEVANT TO THE APPROVAL OF THE MAJOR USE PERMIT

Vallejo Municipal Code (VMC) Section 16.606.03 requires the review authority to make the following findings prior to granting a Major Use Permit. the findings are in bold, and staff’s determination follows in italics.

A. The proposed use is conditionally allowed within the applicable zoning district and complies with all other applicable provisions of the Zoning Code and all other titles of the Vallejo Municipal Code.

The proposed project is located on a property zoned Downtown Mixed Use (DMX). Vallejo Municipal Code Table 16.301-A: Land Use Regulations, requires a Major Use Permit for a school more than 10,000 square feet. The project is consistent with the applicable development standards outlined in Title 16 of the VMC, as proposed and conditioned.

B. The proposed use is consistent with the general plan and any applicable specific plan or planned development and any other applicable plans.

The project site is designated as District – Downtown Waterfront (D-D/W) on the General Plan Land Use Map. It is intended to promote a vibrant, pedestrian‐oriented place that seamlessly integrates downtown with the waterfront. Layering compatible land uses and public amenities, together at various scales and intensities, the D‐D/W designation allows for multiple functions within the same building or adjacent to one another in the same general vicinity to foster a mix of uses that encourages people to live, work, play, and shop in close proximity. The D‐D/W designation is also intended to create a vibrant destination DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

for people from other parts of the city and the region. The project as proposed and conditioned adds 400 students and support staff to the Downtown area in an existing building that has remained vacant for years. This will also bring parents into the downtown and help to activate economic vitality to the Downtown. The project is also consistent with applicable General Plan 2040 policies as noted above in the report.

C. The subject parcel is physically suitable for the type of land use being proposed.

The public charter high school is proposing to renovate and occupy a vacant two-story office building in the Downtown area. No major exterior alterations are proposed for the exterior design of the building. The subject parcel is physically suitable for the proposed use because most activities associated with the school use will occur indoors, the applicant has agreed to incorporate changes to their proposed operational plans and procedures and will construct off-site public improvements to ensure that the proposed use will not create negative impacts on the surrounding properties. These plans and procedures are included as Conditions of Approval. The applicant is proposing to satisfy recreational needs of students with staggered scheduling in the interior recreation areas.

D. The proposed use is compatible with existing and permissible land uses within the zoning district and the general area in which the proposed use is to be located which may include but not be limited to size, intensity, hours of operation, number of employees, or the nature of the operation.

The proposed project is compatible with existing and permissible land uses within the zoning district. A similar educational use is located immediately across Georgia Street from the project site, the use will activate a vacant commercial building and includes site improvements to ensure compatibility with surrounding uses. The proposed use plans to operate between the hours of 8:00 a.m. to 3:30 p.m. Monday-Friday with occasional after- school events and activities. Conditions of approval have been added to reflect these hours and reasonable limitations.

E. The physical location or placement of the use on the site is compatible with and will not adversely affect the livability or appropriate development of abutting properties and the surrounding neighborhood.

The physical location of the proposed project inside an existing vacant office building will not adversely affect the livability or appropriate development of abutting properties and the surrounding neighborhood. Conditions of approval have been added to address vehicle queuing during drop-off and pick up hours.

F. The proposed use and related project features will not create any nuisances arising from the emission of odor, dust, gas, noise, vibration, smoke, heat or glare at a level exceeding ambient conditions and would not otherwise be detrimental to the public interest, health, safety, or general welfare.

As proposed and conditioned, the public charter high school will not create any nuisances from odors, dust, gas, noise, vibration, smoke, heat or glare exceeding ambient conditions.

As proposed and conditioned, the use will not be detrimental to the public interest, health, safety, or general welfare.

G. The project has been reviewed in compliance with the California Environmental Quality Act, if applicable, and the requirements of this chapter.

Following a review of the project, staff is recommending that the Planning Commission find the project categorically exempt from the requirements of the California Environmental DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Quality Act (CEQA), pursuant to Section 15332, Class 32, In-fill Projects. Staff required studies that support this exemption, which is discussed in more detail, below.

IV. DETERMINATIONS RELEVANT TO THE APPROVAL OF ESTABLISHMENT

OF A SCHOOL IN ALL OR PART OF AN EXISTING BUILDING THAT WAS NOT DESIGNED FOR OR OCCUPIED BY A K-12 SCHOOL

VMC Section 16.335.02 A 3 requires the review authority to make the following determinations to grant a Use Permit (the determinations are in bold, and staff’s determination follows in italics):

a. The school location is appropriate for the use, and that adjacent uses will not be adversely affected.

The school location is appropriate for the use, and adjacent uses will not be adversely affected in that a similar and complimentary educational use is located across Georgia Street from the site and students also have easy access to the John F. Kennedy library.

In addition, the school would bring staff, students and parents into the downtown area increasing pedestrian traffic to restaurants and shops.

b. Adequate access, student drop-off areas and required off-street parking is provided.

Under VMC section 16.508.04 A, no parking is required for this site; however, on-street public parking is available on Georgia and Sacramento Streets. Additional parking to support the school and other nearby uses is available in the Downtown Parking District parking lots via parking passes which can be purchased. The applicant is proposing drop-off zones along the curbline of the Georgia and Sacramento Streets during the morning and afternoon which will temporarily reduce the availability of the on-street parallel spaces during this period. Sixteen (16) diagonal spaces on Sacramento Street will be permanently converted into 8 parallel spaces. In addition, the site is adjacent to the Vallejo Transit Hub, and has easy walking or biking via the Class III bike lanes. The applicant is providing bike racks for 38 bikes.

c. Outdoor play areas are appropriately-sized, furnished with facilities and equipment, safe, and secure.

N/A. While indoor PE areas are provided, there are no outdoor facilities.

V. RESOLUTION APPROVING THE PROJECT AT 241-255 GEORGIA STREET NOW, THEREFORE, LET IT BE RESOLVED that the Planning Commission hereby APPROVES, Major Use Permit (UP22-0008) and affirming that the project is exempt from environmental review under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15332 (Class 32: In-fill Projects), based on the above findings and subject to the Conditions of Approval attached to this Resolution.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

VI. VOTE

PASSED AND ADOPTED at a regular meeting of the Planning Commission of the City of Vallejo, State of California, on the 18th day of March 2024 by the following vote to wit:

AYES: Chair Stamps, Vice-Chair Blind, Commissioners Cohen-Thompson, Douglass, Taylor and Beasley-Stansberry
NOES: Commissioner Madeiros
ABSENT: None
ABSTAIN: None

_______________________________________________________

JAMAR STAMPS, CHAIRPERSON
City of Vallejo Planning Commission

Attest:

_______________________________

CHRISTINA RATCLIFFE, AICP, SECRETARY
City of Vallejo Planning Commission

Exhibit A: Conditions of Approval

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 1 of 15 ends

EXHIBIT A

CONDITIONS OF APPROVAL

MAJOR USE PERMIT (UP22-0008)
241-255 GEORGIA STREET, VALLEJO CA, 94589
APN: 0055-170-390

PERMIT DESCRIPTION: The project consists of the phased conversion of a vacant two-story, 34,819 square-foot office building in Downtown Vallejo with associated interior/exterior on-site and right-of-way improvements allowing for the operation of a new public Charter high school with an enrollment of up to 400 students.

A. PLANNING DIVISION

Staff Contact: Erwin Ordoñez, Planning Consultant (707) 648 -4326 [email protected]

Planning Commission Added Conditions:

1. Prior to the issuance of a Building Permit the applicant shall submit a copy of the signed joint use agreement with Wilson Park for City review and approval.

2. As part of the on-going operation of the Public Charter School, the applicant shall provide free monthly transit passes to faculty, staff, and students in-perpetuity during the duration of the approved public-school use.

Pre-Building Permit:

1. The applicant shall submit a numbered list to the Planning Division with a written response regarding how each condition of project approval contained in this report will be satisfied.

The list should be submitted to the project planner , who will coordinate the development of the project. The approved COA will be included in the permit set after the cover sheet with each condition listed and how the applicant will address each condition in writing.

2. The site plan, floor plans, building elevations, and any additional information or representations, whether oral or written, indicating the proposed manner of operation submitted with an application or submitted during the approval process are deemed conditions of approval. Applicant guarantees, warrants, and ensures compliance with the plans and conditions in all respects.

3. The Applicant shall apply for and receive a Temporary Use Permit from the Planning Division for any temporary office or construction trailer.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 2 of 15 ends

During Construction

1. Construction activities shall be managed in compliance with the following requirements:
a. Site Watering. During the project's construction, all portions of the site shall be watered as necessary to reduce emissions of dust and other particulate matter, and all stockpiles shall be covered.
b. Maintenance. Streets and sidewalks shall be made dirt-free at the completion of construction.
c. Noise. All construction and transport equipment shall be muffled in accordance with state and federal laws.
d. Emissions. Construction and transport equipment shall be operated to minimize exhaust emissions. During construction, trucks and equipment should be running only when necessary.
e. Water Run-off. All water run-off from construction sites shall be controlled. During construction, trucks and equipment should be running only when necessary and shall comply with Chapter 12.41 of the Vallejo Municipal Code.

2. No person shall make, or cause to suffer, or permit to be made upon any public property, public right-of-way, or private property any excessive noise, annoying noise, amplified sound or vibrations that are physically annoying to reasonable persons of normal sensitivity or that are so harsh or so prolonged or unnatural or unusual in their use, time or place as to cause or contribute to the unnecessary and unreasonable discomfort of any persons of normal sensitivity located at the lot line of the property from which these noises emanate or that interfere with the peace and comfort of residents or their guests, or the operators or customers in places of business in the vicinity, or that may detrimentally or adversely affect such residences or places of business. (VMC Section 16.502.09 (C))

3. Construction, demolition, and related loading/unloading activities that may generate noise shall be limited to 7 a.m. and 6 p.m. Monday- Friday, Saturday 9 am- 6 pm and Sundays and holidays not allowed. (VMC Section 16.502.09 (D))

4. The fencing for construction sites shall not be installed until a building permit or grading permit has been issued and shall be removed before final inspection. In the event that the building permits expire before the construction is completed, the Planning and Development Services Director may issue a temporary use permit under Chapter 16.339, Temporary Uses, to allow the fencing to remain for a longer period of time. (VMC Section

16.505.08 (B))

Pre-Building Final

1. Prior to the first final building inspection, the landscape architect shall provide a completed Certificate of Completion and a Certificate of Installation , according to the Landscape Documentation by VMC Chapter 16.71: Water Efficient Landscape Requirements. The documentation shall include the following:
a. Irrigation Scheduling (VMC §16.71.050)
b. Schedule of Landscape and Irrigation Maintenance (VMC §16.71.051) DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 3 of 15 ends

c. Landscape Irrigation Audit Report (VMC §16.71.052)
d. Soil Management Report (VMC §16.71.045)

2. Prior to first final building inspection, the Applicant shall install landscaping and irrigation per approved plans. The landscape architect shall verify in writing that the landscaping and irrigation have been installed per the approved landscape plans concerning size, health, number and species of plants, and the overall design concept.

Landscaping

1. Maintenance Required. All landscaping shall be maintained in a healthy and always thriving condition, in compliance with the approved landscape plan. Irrigation systems and their components shall be fully functional and consistent with the original approved design or upgraded to reflect current best practices for water efficiency. Regular maintenance shall include but is not limited to:
a. Adjusting, checking, and repairing irrigation equipment; resetting automatic controllers; aerating and de -thatching turf areas; adding/replenishing fertilizer, mulch, and soil amendments; insect control; the replacement of dead or diseased plants; pruning; watering; and weeding all landscaped areas. b. The trimming of vegetation is necessary to maintain the effective functioning of solar energy facilities and passive solar design features installed both on-site and on adjacent properties.
c. Pruning, cultivating, weeding, fertilizing, replacing plants, and regularly watering. d. Pruning or removal of overgrown vegetation, cultivated or uncultivated, that may harbor rats, vermin, or other nuisances or otherwise be detrimental to neighboring properties.
e. The removal of dead, decayed, diseased, or hazardous trees, weeds , and debris that create an unsightly appearance and may be dangerous to public safety and welfare or detrimental to neighboring properties or property values. Compliance shall be by removal, replacement, or maintenance.
f. Landscaping (trees, shrubs, ground cover, turf, etc.) which, due to accident, damage, disease, lack of maintenance, or other cause, fails to show a healthy appearance and growth, shall be replaced. Replacement plants shall conform to all standards that gov ern the original planting installation, approved landscaping plan, or the director's approval. (VMC Section 16.504.08 (D))

2. Accumulation of leaves, twigs, bark, and other similar materials shall be removed regularly. Planting areas shall be always kept free of weeds. (VMC §16.504.08 (C))

Lighting

1. Lighting shall be designed, located, and installed to be directed downward or toward structures, be shielded or fully shielded. It shall be well-maintained to prevent glare, light trespass (unwanted light on adjacent lots and public rights-of-way), and light pollution to the maximum extent feasible. No permanently installed lighting shall blink, flash, or be of DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 4 of 15 ends

unusually high intensity or brightness, as determined by the Planning and Development Services Director. (VMC §16.506.04 (B))

General Requirements

1. A final decision on an application for any discretionary approval subject to appeal shall become effective after the expiration of ten calendar days following the date of action unless an appeal is filed. No building permit or business license shall be iss ued until the 11th day following the action date. If a different termination date is fixed at the time of granting, or if actual construction or alteration has begun under valid building permits, the ten days may be waived. (VMC §16.602.11)

2. The review authority, in the granting of any permit, may specify a time consistent with the purposes of the use and necessary to safeguard the public safety, health, and welfare, within which the proposed use must be undertaken and actively and continuously pursued.

If no time period is specified, any permit granted under the Zoning Code shall automatically expire within two years of the effective date (which is March 18, 2024) (VMC §16.602.12 (A)). All Planning permits associated with this approval shall expire on March 18, 2026, unless exercised or extended.

3. If a permit is granted in conjunction with approval of new construction, issuance of a building permit shall constitute exercise of rights; provided, however, that, unless otherwise specified as a condition of project approval, the permit shall expire if:
i. The Building Permit expires.
ii. Final inspection is not completed, or certificate of occupancy issued within the time specified as a condition of project approval.
iii. The rights granted under the permit are not exercised within one year following the earliest to occur of the following: issuance of a certificate of occupancy; or if no certificate of occupancy is required, the last required final inspection for the new construction. (VMC §16.602.11 (B))

4. The Planning and Development Services Director may approve a one -year extension of any permit or approval granted for a residential or non-residential project under the Zoning Code upon receipt of a written application and fees received fifteen calendar da ys (November 6, 2025) before the expiration date with the required fee prior to expiration of the permit. (VMC §16.602.11 (C.1))

5. No change in the use or structure for which a permit or other approval has been issued is permitted unless the permit is modified as provided for in the Zoning Code. For this chapter, the modification of a permit may include minor modification of a develop ment review approval that is in substantial compliance as determined by the Planning and Development Services Director. (VMC §16.602.11 (D))

6. Applications for changes to an approved permit must be filed and processed in compliance with the requirements in VMC Section 16.602.02, Application Forms and Fees, and shall be subject to a fee established by the Master Fee Schedule. a. Minor Modifications. The Planning and Development Services Director may approve minor changes to approved plans that are consistent with the original findings and conditions approved by the hearing body and would not intensify any potentially detrimental effects of the project.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 5 of 15 ends

b. Major Modifications. A request for changes in conditions of approval of a discretionary permit or a change in an approved site plan or building plan that would affect the findings adopted as a basis for project approval shall be treated as a new application, except that the Planning and Development Services Director may approve changes that she determines to be minor. (VMC §16.602.11 (E))

7. A request for major changes to an approved site plan or building plan that will not affect the findings adopted as a basis for project approval but are still considered substantial shall be forwarded to the original review authority for the discretionary permit for review and approval. (VMC §16.602.11 (F))

8. For new developments, utilities including, but not limited to, all electrical, telephone, cable television, fiber -optic cable, gas, water, sewer, irrigation/recycled water, and similar distribution lines providing direct service to a project shall be installed underground within the site. The Planning and Development Services Director may waive this requirement upon determining that underground installation is infeasible, or the electrical line is otherwise exempt from an under-grounding requirement. (VMC §16.501.10)

9. The Applicant shall obtain an inspection from the Planning Division before the final building inspection. All inspections require a minimum of 24-hour notice. Occupancy permits shall not be granted until all construction and landscaping are completed and finalized by the approved plans and required conditions of approval or a bond has been posted to cover all costs of the unfinished work as agreed to by the Planning and Development Services Director.

10. Applicant shall indemnify, hold harmless, and defend City, its officers, officials, directors, employees, agents, volunteers and affiliates and each of them from any and all claims, demands, causes of action, damages, costs, expenses, actual attorney’s fees, applicant’s fees, expert fees, losses or liability, in law o r in equity, of every kind and nature whatsoever arising out of or in connection with Applicant’s operations, or any subcontractor’s operations, to be performed under this agreement for Applicant’s or subcontractor’s tort negligence including active or passive, or strict negligence, including but not limited to personal injury including, but not limited to bodily injury, emotional injury, sickness or disease, or death to persons and/or damage to property of anyone, including loss of use thereof, caused or alleged to be caused by any act or omission of Applicant, or any subcontractor, or anyone directly or indirectly employed by any of them or anyone for the full period of time allowed by the law, regardless to any limitation by insurance, with the exception of the sole negligence or willful misconduct of the City. No modification of the project, any application, permit, certification, condition, environmental determination, other approval, change in applicable laws and regulations, or change in processing methods shall alter the Applicant’s indemnity obligation.

Transportation Impact Analysis (TIA)

The following conditions of approval implement recommendations from the Transportation Impact Analysis prepared for this project.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 6 of 15 ends

1. Prior to the issuance of any permits, the Applicant shall prepare and submit for approval to the City’s Traffic Engineering Division, a proposed Parking and Circulation Plan, which will describe in detail : proposed hours, days of operation, staffing, permanent and temporary signage, methods of dissemination/distribution of information, enforcement mechanisms, and proposed operational procedures for implementing the pedestrian, bicycles and vehicular circula tion/parking noted in the plan.

At least two copies of the approved plan shall be provided to the City Traffic Engineering and Planning Divisions to be retained as a Public Record and to ensure future enforcement of the Major Use Permit Conditions of Approval. Violations of City approved Conditions of Approvals may result in future Use Permit revocation actions.

The required plan shall:
a. Direct parents/guardians to the Georgia Street loading/unloading zone when dropping off or picking up their students.
b. Require that staff, students, and visitors will be responsible for paying for their parking spots in the City-owned and publicly available parking within the surrounding area.
c. Identify vehicles regularly parked in the schools loading zone that need to be ticketed and towed by the City and a mechanism to regularly share this information with Vallejo Police Department and Public Works
d. Detail how (School) Staff will be stationed at unique locations at the loading zones and meet vehicles at the curb to help direct drivers entering/exiting the loading areas.

At least six staff members should be stationed on Georgia Street and three on Sacramento Street. At least one staff member should be stationed at the southwest corner of Georgia Street/Sacramento Street to ensure vehicles are not blocking the intersection.
e. Detail the schedule for staff to be stationed at the loading zones at least one hour before the first morning bell and stay approximately 10 minutes after the start of school.

In the afternoon, staff should be stationed at the loading zones at least 10 minutes before the last afternoon bell and stay approximately five minutes after the queues have dissipated.
f. Require parent’s vehicles to pull forward in the loading zones as far as possible to allow for the maximum number of vehicles to drop-off/pick-up their student(s). g. Require parents/guardians to stay in their vehicles at all times while students exit/enter via the right side of the vehicles when greeted by the staff member. h. Include a written drop-off and pick-up procedure with supporting graphics that can be communicated with the students’ parents/guardians via handouts and shared electronically through the school’s website.

2. Prior to the issuance of any permits, the Applicant shall amend plans submitted for Building Permit Plan Check approval to show bicycle parking facilities to accommodate at least 38 bicycle parking spaces and the required bicycle parking shall be available DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 7 of 15 ends

for use prior to issuance of Final Inspection approvals or the issuance of a Certificate of Occupancy.

3. Prior to issuance of Final Inspection approvals or the issuance of a Certificate of Occupancy the applicant(s), at their shall cost, shall permanently install in a manner consistent with City standards, City approved signs along both proposed loading zones (Georgia Street and Sacramento Street) which note the following: "No parking from 7 to 9 AM and 3 to 5 PM on weekdays - violators will be towed".

4. Prior to issuance of Final Inspection approvals or the issuance of a Certificate of Occupancy the applicant(s), at their shall cost, shall permanently paint the curbs white in both loading and unloading zones in a manner consistent with City and State standards.

5. Prior to issuance of Final Inspection approvals or the issuance of a Certificate of Occupancy, the applicant(s), at their shall cost, shall permanently install in a manner consistent with City standards, Manual on Uniform Traffic Control Devices (MUTCD) compliant R10-7 “DO NOT BLOCK INTERSECTION” signs on all four approaches to the Santa Clara Stre et/Georgia Street and Sacramento Street/Georgia Street intersections. Signs shall be mast arm mounted if possible with existing equipment (street mounted/installed if not possible on the existing signal mast arms).

6. Prior to issuance of Final Inspection approvals or the issuance of a Certificate of Occupancy the applicant(s), at their cost, shall permanently install or cause to be installed in a manner consistent with City standards, all the improvements noted within the public rights-of-way as depicted in the approved development plans including all regulatory sig ns. The applicant(s) are responsible for obtaining any additional approvals and paying for any additional fees associated with these improvements.

Historical/Cultural Resources Best Practice for Excavation The following conditions of approval implement recommendations from the Historic/Cultural Resources background documentation prepared for this project.

1. The applicant shall immediately notify the City Building and Planning Divisions upon the discovery of any historic, cultural, or archaeological discovery that results from the construction or excavation activities occurring on the project site.

2. If a unique archaeological resource is discovered, reasonable efforts shall be made by the applicant to permit any or all of these resources to be preserved in place or left in an undisturbed state. Examples of appropriate treatment, in no order of preference, may include, but are not limited to, the following:
a) Planning construction to avoid archaeological sites. b) Deeding archaeological sites into permanent conservation easements. c) Capping or covering archaeological sites with a layer of soil before building on the sites.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 8 of 15 ends

d) Planning parks, greenspace, or other open space to incorporate archaeological sites.

3. To the extent that unique archaeological resources are discovered and preservation in place is not feasible, an archeologist would determine an appropriate treatment plan, which could include excavation. Retention of a qualified archeologist for this pur pose shall be made at the applicant’s expense with the approval of the City.

4. In the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, the applicant shall immediately notify the City and there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent remains until the coroner of the county in which the human remains are discovered has determined, in accordance with Chapter 10 (commencing with Section 27460) of Part 3 of Division 2 of Title 3 of the Government Code, that the remains are not subject to the provisions of Section 27491 of the Government Code or any other related provisions of law concerning investigation of the circumstances, manner and cause of any death, and the recommendations concerning the treatment and disposition of the human remains have been made to the person responsible for the excavation, or to his or her authorized representative, in the manner provided in Section 5097.98 of the Public Resources Code. The coroner shall make his or her determination within two working days from the time the person responsible for the excavation, or his or her authorized representative, notifies the coroner of the discovery or recognition of the human remains.

If the coroner determines that the remains are not subject to his or her authority and if the coroner recognizes the human remains to be those of a Native American, or has reason to believe that they are those of a Native American, he or she shall contact, by telephone within 24 hours, the Native American Heritage Commission.

5. Upon the discovery of the Native American remains, the applicant/landowner shall ensure that the immediate vicinity, according to generally accepted cultural or archaeological standards or practices, where the Native American human remains are located, is not damaged or disturbed by further development activity until the landowner has discussed and conferred, as prescribed in State Law, with the most likely descendants regarding their recommendations, if applicable, taking into account the possibility of multiple human remains. The landowner shall discuss and confer with the descendants all reasonable options regarding the descendants’ preferences for treatment.

B. BUILDING DIVISION
Staff Contact: Steve Arnold, Building Official, (707) 648-4387 [email protected]

1. Plans and permits are required for building, mechanical, plumbing and electrical work per California Code of Regulations, Title 24 and applicable City Ordinance in effect at the time of completed Building Permit application date and required fees shall be paid at time of application.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 9 of 15 ends

2. 2022 California Code of Regulations will apply to this project if permit application(s) are received before end of 2025. After December 31, 2025, the 2025 California Code of Regulations will apply.

3. Accessibility is required for this project per CBC 11B; See 11b-209.2 and 11B-503 for Passenger drop off and loading zone requirements.

4. Prior to the issuance of permits, please refer to Section 32020 of the Education Code for Fire/Police/Ambulance access requirements at fences or gates.

5. Vertical access is required for Phase 2 second floor education area. Please clarify your intent with Building Division staff prior to applying for permits for Phase 2. A possible exception for second floor office space less than 3000 square feet and not open to the public per 11B..206.2.3 EXC 1.2 (info only)

C. VALLEJO FLOOD & WASTEWATER DISTRICT (VFWD)
Staff Contact: Alan Mitchell, P.E., Contract Plan Check, (530) 681-0553 [email protected]

1. Provide sewer analysis for VFWD approval, prior to issuance of Building Permit.

2. A complete District Pre-Treatment Questionnaire (PTQ) is required, describing the nature of proposed food service. Here is a link for the PTQ that can also be located on the VFWD’s website.

4. Pay applicable VFWD fees (plan review, connection, inspection) before approval by VFWD and issuance of Building Permit.

5. VFWD inspection will be required prior to Building Permit sign-off.

6. Verify depth of existing sewer main, prior to starting construction. Notify VFWD if greater than 10'.

7. Prior to occupancy/final building inspection, provide a standard VFWD cleanout at the right-of-way/easement line per District standards and a two-way cleanout at the building per the U.P.C. This applies to all laterals.

8. New 2-way cleanout is shown under the bike racks, so please confirm the bike racks are moveable for access to cleanout.

9. See VFWD Detail SS-2, Table 1, which shows new lower lateral shall be SDR26 PVC.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 10 of 15 ends

10. Confirm separation between existing W and proposed lower sewer lateral. Notify Vallejo PW Water Division to confirm acceptable.

11. Provide sewer analysis before VFWD approval.

12. Pay applicable VFWD fees before approval.

D. SOLANO COUNTY TRANSIT
Staff Contact: Patricia Carr, General Services Manager,[email protected]

1. The drop-off behind the building MUST be controlled by the school. Carpools queues cannot block access to the private roadway or access to the parking spaces.

E. VALLEJO FIRE DEPARTMENT

Fire Prevention Plan Review
Project Description: CHANGE IN USE; Preliminary Review to Establish a Public Charter School (E Occupancy) from an Existing Building — 34,819 sq. ft. of Tenant Improvement — 22,959 E Occupancy and 11,860 of B Occupancy

The project plans have been reviewed with the information supplied. Subsequent plan submittals for review may be subject to additional requirements. Field inspections that discover fire/life safety issues may require additional revisions or alterations. Permits expire 1 year from issuance. The Fire Department recommends a fire safety inspection should occur to review the building for Fire and Building Code compliance.

Fire Code Requirements

FIRE ACCESS

2. The building electrical service disconnecting means shall be installed in a readily accessible location either outside the building or nearest the point of entrance of the service conductors. The disconnecting means shall be accessible to emergency personnel, either directly or by a remote actuating device without requiring transit of the building interior.

3. A Knox Box (key box) mounted no higher than 5 feet above the finished floor containing appropriate keys for emergency Fire Department access shall be provided. The minimium size box is the 3200 series with a hinged door. The tamper kit is not required, box color may be any of the Knox options. It takes approximately 2 weeks for delivery. For more information call the Fire Prevention Division at (707) 658-4565 or visit www.knoxbox.com
DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 11 of 15 ends

4. Keys for the Knox Box entry system required by the Fire Department shall be attached to durable tags with permanent marking identifying the door(s) or lock(s) that the key functions with. i.e. "MASTER" or "MECHANICAL ROOM",

5. Approved address numbers shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Said numbers shall clearly contrast with their background. The characters shall be a minimum of 4" high with a 1/2" stroke. The size of the building and distance or location of the address numbers from the roadway may necessitate larger numbers. A building directory sign is required at the main entrance. All buildings require identification numbers or letters.

6. Rooms or areas containing controls for HVAC systems, electrical panels, automatic fire extinguishing systems, fire alarm equipment or other detection, suppression or control elements shall be identified with appropriate signs.

FIRE PROTECTION SYSTEMS

8. Smoke detection/dampers for HVAC systems shall be required as set forth in the Mechanical Code. Areas served by a single or multiple units exceeding 2,000 CFM shall have detectors installed and supervised by the fire alarm system. Detectors shall not trip a general alarm. Detectors shall be selfrestoring or a readily accessible manual reset shall be installed.

9. The minimum fire-extinguisher requirement shall be one 2A-10BC rated portable unit in such locations so that maximum floor -travel distance does not exceed 75 to the nearest extinguisher from any portion of the building with a maximum of 3,000 square feet o f floor area surveyed. Plan submittal shall include the proposed location of extinguishers. Final location shall be approved in the field by the Fire Department.

10. All fire extinguishers shall be mounted in a conspicuous and readily accessible location either on a bracket or within an approved storage cabinet. Fire extinguishers shall be mounted so the top of the unit is 3 feet to 5 feet off the finished floor. If the extinguisher is not readily visible, a sign shall be located directly above the extinguisher. The sign shall be legible and of a contrasting color with its background.

11. An automatic fire sprinkler system is required for the proposed E Occupancy tenant improvement building. Please submit 2 sets of plans and calculations to the Fire Marshal's Office and obtain permit prior to installation. Please note the density of the system must be compatible with the occupancy classification and designed in accordance with NFPA 13.

12. A manual and automatic fire alarm system that initiates the occupant notification signal utilizing an emergency voice/alarm communication system meeting the requirements of the Fire Code and NFPA 72 is required. When automatic sprinkler systems or smoke de tectors are installed, such systems or detectors shall be connected to the building fire alarm system. Please submit 2 sets of fire alarm plans and obtain permit from the Fire Prevention Bureau prior to installation. Please include listed device selections cut sheets.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 12 of 15 ends

13. A underground fire service main is required. A separate permit from the Fire Prevention Division is required. Please submit 2 sets of plans for the underground fire service main for review by the Fire Official prior to installation.

14. This project shall comply with the California Fire Code regarding fire flow requirements, including Appendix B. Fire flow calculations shall be designed by a fire protection engineer or C-16 licensed contractor.

15. Fire hydrants must be installed and approved by the fire department prior to combustible construction. Fire hydrants shall be spaced a maximum of 300 feet apart.

Please indicate on the plans the location of all existing and proposed Fire hydrants.

16. Approved impact protection shall be installed as necessary to protect hydrants from vehicular damage.

17. The contractor shall be responsible for painting of hydrants, verifying street valves are fully opened and the placement of blue reflective dots prior to requesting a final inspection. Maintenance, inspection and testing of private hydrants are the responsibility of the property owner. Private hydrants shall be painted red.

18. Kitchen. Provide an approved automatic fire extinguishing system to protect all cooking equipment. A permit is required from the Fire Marshal's office for fixed fire extinguishing systems. Please submit 2 sets of plans for review and approval. Design and system calculations shall be prepared by a licensed C-16 Contractor.

19. Activation of the (kitchen) fixed fire extinguishing system shall activate the building fire alarm.

MEANS OF EGRESS

20. An exit corridor is required and shall be a minimum of 44 inches wide and have a fire resistive rating of 1 hour.

21. All buildings shall comply with the California Building Code, Chapter 10 Means of Egress requirements. Including but not limited to; exit signs, exit doors, exit hardware and exit illumination.

22. Provide an approved exit sign over all required exit doors.

23. Means of egress illumination shall be provided and maintained at any time the building is occupied. The means of egress shall be illuminated of not less than 1 foot candle power and shall be approved by the Fire Prevention Division prior to sign-off of the final inspection.

24. Emergency exit lighting shall be provided at or near all exits and as designated by the Fire Marshal. Final exit lighting shall be approved by the Fire Marshal prior to sign-off of the final inspection.

25. All emergency lighting, exit sign lights shall have two separate sources of power as required by the California Building Code.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 13 of 15 ends

26. Locking devices on exit doors shall conform to the California Building Code. Only one lock or latch requiring one motion/operation to open/unlock is required. No double keyed dead-bolts are permitted on exit doors.

27. Maintain the width of the exit system; tables, chairs, storage systems and other devices shall not obstruct the means of egress along the path of exit travel based on the cumulative occupant load served. Maintain clear access to all exits.

28. Provide panic hardware on all required exits. All exit doors shall open in the exit direction of travel. A, E, 1 2 and 1 2.1 Occupancies only.

MISC. REQUIREMENTS

29. All interior finishes, decorative material and furnishings shall meet the flammability, smoke and combustibility requirements of the Fire Code.

30. All roof material shall be rated class 'A" or better.

31. Provide "Roof Access" sign at roof ladder location.

32. Post an occupant load sign in a conspicuous place near the main exit from all rooms designated as "Assembly Areas". The sign shall read as follows; Maximum Occupants:

General
Dining
(calculations shall be provided by the Architect)

33. Provide a 1-hour fire separation between the B and A & E occupancies as required by the 2019 California Building Code.

34. The Emergency Plan including fire drill procedures shall be submitted to the Fire Marshal for review prior to final occupancy.

VFD & CSFM Fire Drill Requirements for Schools
CFC 403.5 Group E occupancies. An approved fire safety and evacuation plan in accordance with Section 404 shall be prepared and maintained for Group E occupancies and for buildings containing both a Group E occupancy and an atrium.

Group E occupancies shall comply w ith Sections 403.5.1 through 403.5.4. [California Code of Regulations, Title 19, Division 1, S3.13(a)(1)] Fire Drills. (Group E Occupancies)
(a) Group E Occupancies.
(1) General. Every person and public officer managing, controlling, or in charge of any public, private, or parochial school shall cause the fire alarm signal to be sounded upon DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 14 of 15 ends

the discovery of fire. Every person and public officer managing, controlling, or in charge of any public, private, or parochial school, other than a two-year community college, shall cause the fire alarm signal to be sounded not less than once every calendar month at the elementary and intermediate levels, and not less than twice yearly at the secondary level, in the manner prescribed in California Code of Regulations, Title 24, Part 2, Section 907. A fire drill shall be held at the secondary level not less than twice every school year.
403.5.1 Group E Occupancies. Every person and public officer managing, controlling, or in charge of any public, private, or parochial school, other than a two-year community college, shall cause the fire alarm signal to be sounded not less than once every calendar month at the elementary and intermediate levels, and not less than twice yearly at the secondary level in the manner prescribed in Section 907. A fire drill shall be held at the secondary level not less than twice every school year. 403.5.1.1 Emergency Pre-Fire Planning. Each school principal, district superintendent or day nursery manager shall, in cooperation with the enforcing agency, prepare procedures to be followed in case of fire or other emergency. They should include the following:

1. Posting of the telephone number of the fire department in the office and/or at the main switchboard.

2. Assignment of a responsible person to call the fire department upon notification of any fire or activation of the alarm system for any reason other than fire drills.

3. Posting in a conspicuous place in each classroom or assembly area a plan showing paths of travel to evacuate the room in case of emergency and including an alternate route.

4. Posting in each classroom instructions to be followed by the teacher. These should include:
a. 4.1. Maintaining of order during evacuation.
b. 4.2. Removal of roll call book and calling of roll when designated evacuation area is reached.
403.5.2 First emergency evacuation drill. The first emergency evacuation drill of each school year shall be conducted within 10 days of the beginning of classes. 403.5.3 Time of day. Emergency evacuation drills shall be conducted at different hours of the day or evening, during the changing of classes, when the school is at assembly, during the recess or gymnastic periods, or during other times to avoid distinction between drills and actual fires.
403.5.4 Assembly points. Outdoor assembly areas shall be designated and shall be located a safe distance from the building being evacuated to avoid interference with fire department operations. The assembly areas shall be arranged to keep each class separate to provide accountability of all individuals.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

Page 15 of 15 ends

35. A final inspection from the Fire Prevention Division is required.

Requests for field inspection shall be made a minimum of 24 hours in advance by calling the Fire Prevention Division at (707) 648 -4565, Monday through Friday 9:00AM to 3:00PM. If you have any questions regarding these requirements, please feel fre e to contact this office at (707) 648-4565.

DocuSign Envelope ID: BCF4876B-A0B9-4747-A53C-CA9D19C1F1B4

ORDINANCE NO. 1853 N.C. (2d)

AMENDING THE DOWNTOWN VALLEJO SPECIFIC PLAN/MASTER PLAN

AS PART OF THE NEW ZONING CODE PROJECT

THE COUNCIL OF THE CITY OF VALLEJO DOES ORDAIN AS FOLLOWS:

SECTION 1. Recitals.

WHEREAS, on August 29, 2017, the City Council certified the Final Environment Impact Report (FEIR) for General Plan 2040 and adopted the General Plan 2040; and

WHEREAS, the City Council amended the General Plan 2040 in November 2017, July 2018, and January 2020; and

WHEREAS, based on the analysis conducted for the new Zoning Code, Staff proposed amending the General Plan to: (1) address the residential densities in four commercial and mixed use land use designations; (2) address residential use in additional areas to achieve the housing goals; and (3) amend the General Plan 2040 Land Use Map to correct errors and re-designate parcels to more closely align with their existing land use characteristics and future development potential (collectively, the “General Plan Amendments”); and

WHEREAS, Staff determined additional actions were necessary to effectuate General Plan 2040 and the new Zoning Code, including repealing the Northgate Specific Plan and repealing Planned Unit Developments #575 and #582, and amending the Downtown Vallejo Specific Plan/Master Plan and White Slough Specific Area Plan/Master Plan, which together with the General Plan Amendments and the adoptio n of the new Zoning Code and new Zoning Map constitute the Project;

WHEREAS, the General Plan 2040 acknowledges that Vallejo's strategic location and transportation connections led to the adoption of long -range plans for key areas including the Downtown Vallejo Specific Plan and White Slough Specific Area Plan, which also serve as the Planned Development Master Plan (Master Plan) for those areas, respectively; and

WHEREAS, the General Plan 2040 Table 1-2 Consistency with Adopted Plans anticipated that development standards for the Downtown Vallejo Specific Plan/Master Plan and the land use regulations in the White Slough Specific Area Plan/Master Plan would be provided in the New Zoning Code; and

WHEREAS, both the Downtown Vallejo Specific Plan/Master Plan and White Slough Specific Area Plan/Master Plan reflect unique policies, goals, and objectives as well as specific planning standards and regulations for land use within their plan boundaries that remain relevant; and

WHEREAS, in order to provide a broader, more flexible range of land uses and to implement objective development standards to position Vallejo to be more competitive in the market place, City Council proposes to amend the Downtown Vallejo Specific Plan/Master Plan and White Slough Specific Area Plan/Master Plan by amending select land use regulations and development standards and referencing the New Zoning Code; and

DocuSign Envelope ID: 1AE2284B-D711-4A3A-AB04-2256A8295FC9 2 WHEREAS, the proposed Specific Plan amendments will eliminate confusion, redundancy, and potential conflicts with the New Zoning Code; and

WHEREAS, on March 29, 2021, the Planning Commission adopted Resolution of Intention No.

PC 21-06A directing staff to prepare amendments to the Downtown Vallejo Specific Plan/Master Plan and the White Slough Specific Area Plan/Master Plan; and

WHEREAS, an Initial Study/Mitigated Negative Declaration (IS/MND) (State Clearinghouse #2021010077) has been prepared for the Project in accordance with the California Environmental Quality Act; and

WHEREAS, on January 7, 2021, a Notice of Intent to Adopt a Mitigated Negative Declaration and Hold a Public Hearing on February 17, 2021 and announcing the 30-day public review period for the IS/MND, beginning January 8, 2021 and ending on February 9, 2021 was sent to all public agencies potentially serving the Project, all responsible and trustee agencies, and all persons requesting notice and on January 12, 2021 was published in the Times Herald, a newspaper of local circulation; and

WHEREAS, on February 17, 2021, the Planning Commi ssion opened the duly noticed public meeting on the Project and voted unanimously to continue the public hearing to March 15, 2021; and

WHEREAS, on February 17 and 22, 2021, a Revised Notice of Intent to Adopt a Mitigated Negative Declaration and Hold a Public Hearing on March 15, 2021, extending the public review period for the IS/MND to February 26, 2021, was sent to all persons entitled to notice, and on February 21, 2021 was published in the Times Herald, a newspaper of local circulation; and

WHEREAS, on March 15, 2021, the Planning Commission held a duly noticed public hearing and considered all oral and written comments on the Project and the IS/MND, and voted unanimously to continue the hearing to March 29, 2021; and

WHEREAS, on March 29, 2021, the Planning Commission held the public hearing continued from March 15, 2021 and by the adoption of Resolution No. PC 21 -03, renumbered as 21 -03A, recommended that the City Council adopt the IS/MND and the Mitigation Monitoring and Reporting Program (MMRP) for the Project, and to consider the IS/MND prior to taking any action on the Project, and voted unanimously to adopt Resolution PC 21 -06 to forward to City Council an Ordinance adopting the amendments to the Downtown Vallejo Specific Plan/Master Plan and White Slough Specific Area Plan/Master; and

WHEREAS, all interested persons were afforded the opportunity to file written comments with the City of Vallejo Planning Division at or befor e the hearing, all persons desiring to be heard were given an opportunity to be heard in this matter, and all such verbal and written testimony was considered by the Planning Commission; and

WHEREAS, on March 31, 2021, a Notice to Hold a Public Hearing on April 13, 2021 by the City Council on the Project and the IS/MND was sent to all persons entitled to notice and on April 3, 2021, was published in the Times Herald, a newspaper of local circulation; and

WHEREAS, on April 13, 2021, the City Council held a duly noticed public hearing on the Project, the IS/MND, and the MMRP and considered all oral and written comments thereon; and

DocuSign Envelope ID: 1AE2284B-D711-4A3A-AB04-2256A8295FC9 3 WHEREAS, all interested persons were afforded the opportunity to file written comments with the City of Vallejo Planning Division at or before the hearing, all persons desiring to be heard on the matter were given an opportunity to be heard, and all such verbal and written testimony was considered by the City Council; and

WHEREAS, upon conclusion of the public hearing, the City C ouncil voted unanimously to continue the public hearing to a date uncertain; and

WHEREAS, on April 28, 2021, the IS/MND was revised to correct errors and a Notice of Intent to Adopt a Revised Mitigated Negative Declaration and Hold a Continued Public Hearing on June 7, 2021 was sent to all persons entitled to notice, was published in the Times Herald, a newspaper of local circulation, and sent to the State Clearinghouse, thereby extending the public review period to May 28, 2021; and;

WHEREAS, on June 7, 2021, the City Council held a duly noticed public hearing and considered all oral and written comments on the Revised IS/MND, the Project, and associated actions including the MMRP; and

WHEREAS, all interested persons were afforded the opportunity to file written comments with the City of Vallejo Planning Division at or before the hearing, all persons desiring to be heard were given an opportunity to be heard in this matter, and all such verbal and written testimony was considered by the City Council; and

WHEREAS, the Record of Proceedings (“Record”) upon which the City Council bases its action includes, but is not limited to: (1) the Revised Initial Study/Mitigated Negative Declaration (IS/MND) and the appendices and technical reports cited in and/or relied upon i n preparing the same; (2) the staff reports, City files and records and other documents, prepared for and/or submitted to the City relating to the Revised IS/MND and the Project; (3) the evidence, facts, findings and other determinations set forth in this resolution; (4) the City of Vallejo General Plan and its related EIR, and the Vallejo Municipal Code; (5) all designs, plans, studies, data and correspondence submitted by the City in connection with the Revised IS/MND and the Project; (6) all documentary and oral evidence received at public workshops, meetings, and hearings, for the Project; and (7) all other matters of common knowledge to the City decision maker including, but not limited to, City, state, and federal laws, policies, rules, regulations, re ports, records and projections related to development within the City of Vallejo and its surrounding areas; and

WHEREAS, on June 7, 2021 City Council adopted Resolution No. 21-060 N.C. adopting the Initial Study/Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program for the Project; and

WHEREAS, on June 7 , 2021 the City C ouncil adopted Resolution No. 21 -061 N.C to adopt Amendments to the General Plan Text and Land Use Map as part of the Project; and

WHEREAS, on June 7, 2021 the City Council introduced an Ordinance approving the Repeal of the Northgate Specific Plan and Planned Development Unit Plan #575 and #582 as part of the Project.

SECTION 2: Findings.

1. The proposed amendments are consistent with the Vallejo Municipal Code. The Downtown Vallejo Specific Plan is also the Planned Development Master Plan for the downtown area DocuSign Envelope ID: 1AE2284B-D711-4A3A-AB04-2256A8295FC9 4 Planned Development Master Plans may be amended pursuant to 16.116.140 of the Vallejo Municipal Code.

2. The proposed amendment to the Downtown Vallejo Specific Plan/Master Plan is consistent with the Vallejo General Plan. The General Plan 2040 Table 1-2 Consistency with Adopted Plans does not propose any significant changes to t he Specific Plan and anticipates that the policies in the Downtown Specific Plan would continue implementation of the Specific Plan, except for development standards, which will be removed from the Specific Plan and addressed by the City's New Zoning Code (referred to as the Development Code in General Plan 2040). The land use regulations in the New Zoning Code will also implement the Specific Plan policies by providing a broader range of land uses, specifically the Downtown Mixed Use zoning district. This zoning district is consistent with the Downtown/Waterfront General Plan Land Use Designation for the area and implements the General Plan goal to foster a mix of uses that encourage people to live, work, play, and shop in close proximity.

SECTION 3: Downtown Vallejo Specific Plan Amendments. New text shown in bold underline, deleted text in strike through.

A. Chapter 8, Land Use Regulations is hereby amended as follows:

INTRODUCTION
Title 16 of the Vallejo Municipal Code (Zoning Code) shall be used to regulate all land uses within the Specific Plan area, unless stated herein. The Downtown Vallejo Specific Plan serves as the “zoning ordinance” for the Plan area. Accordingly, this chapter sets forth the land use regulations for the Plan area, which are unique to Downtown. The provisions of this chapter shall be used by the City to regulate all land uses within the Specific Plan area.

The regulations in this chapter are intended to promote land uses that are desirable and promote the goals and policies of the Specific Plan.

Land uses that are in conflict with and in existence at the time of adoption of this Specific Plan the Zoning Code are permitted to continue as legal nonconforming uses consistent with the provision of the Vallejo Municipal Code Chapter 16.78 16.104.

B. The following sections of Chapter 8, Land Use Regulations are hereby removed:

1. General Land Use Provisions

2. Interim Land Use Provisions

3. Figure 8.2 Interim Zoning Map

4. Table 8.1, Permitted and Conditional Land Uses

5. Special Land Use Provisions

6. Definitions for Unique Land Use Classifications

C. Chapter 9, Development Standards is hereby amended as follows:

INTRODUCTION
DocuSign Envelope ID: 1AE2284B-D711-4A3A-AB04-2256A8295FC9 5 The purpose of the Development Standards is to guide future development in Downtown so that it is consistent with the vision and goals for the area as detailed in the Specific Plan. Unless provided herein, the Development Standards for the Plan area shall comply with Title 16 of the Vallejo Municipal Code . establish the appropriate building intensities and other requirements that are specific to Downtown. More importantly, these The Standards are intended to encourage high quality development while providing the framework for creative designs.

USE OF DEVELOPMENT STANDARDS
Downtown Vallejo is envisioned to include a wide range of uses and to encourage mixed use buildings which contribute to a lively urban environment. These standards are designed to promote mixed-use buildings where the first floor uses are those that contribute to an active street environment and the upper floors have the flexibility of including a wider range of uses. The land uses allowed in each of the Downtown districts is listed in detail in Chapter 8: Land Use Regulations.

This chapter contains standards and regulations that are mandatory for all development within the Specific Plan area that require discretionary approval. All projects , proposed within the Specific Plan that shall require the appropriate decision-making body to make the following finding:
“The proposed project meets the goals and policies of the Downtown Vallejo Specific Plan, including the intent of the Downtown Vallejo Design
Guidelines.”

RELATIONSHIP TO DESIGN GUIDELINES
In addition to the Development Standards included in this chapter, a A comprehensive set of design guidelines - Downtown Vallejo Design Guidelines – were adopted for the Specific Plan area. The Development Standards for the Specific Plan Area are included in this chapter and provided in Title 16 of the Vallejo Municipal Code and should be used in conjunction with the Design Guidelines. While the Design Guidelines are interpretive and allow some level of discretion, they have stated objectives that provide the basis for project approval. Specific references to Design Guidelines are included here for standards relating to building heights and parking where the standard must be considered in conjunction with the Design Guidelines. Both the Development Standards and the Design Guidelines indicate the minimum requirements. Compliance with the Development Standards Design Guidelines does not automatically guarantee project approval.

DocuSign Envelope ID: 1AE2284B-D711-4A3A-AB04-2256A8295FC9 6 D. The following sections of Chapter 9, Development Standards are hereby removed:

1. Relationship to Other Documents

2. Development Standards

3. Interpretation of Development Standards

4. Exceptions to Development Standards

5. Outdoor Dining Performance Standards

6. Development Standards for Fast food/Take-out

7. Outdoor Display

8. Live-Work Performance Standards

9. Review Authority

10. Noticing Procedures

E. Chapter 9, Development Standards is hereby amended as follows:

REQUIRED APPROVALS
This section is removed and replaced as follows:

All approvals shall comply with Title 16 of the Vallejo Municipal Code (Zoning Code).

SECTION 4: Adoption of the Downtown Vallejo Specific Plan Amendment.

Based on the findings set forth herein and the Record as a whole, the City Council hereby adopts amendments to the Downtown Vallejo Specific Plan/Master Plan provided herein.

SECTION 5: Typographical and Clerical Errors.

Any typographical or clerical errors in this Ordinance may be remedied by the City Attorney with the assistance of the City Clerk and shall not constitute an alteration.

SECTION 6: Severability.

If any section, subsection, sentence, clause, phrase, or word of this Ordinance is for any reason held to be invalid by a court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have passed and adopted this Ordinance, and each and all provisions hereof, irrespective of the fact that one or more sections, subsections, subdivisions, paragraphs, sentences, clauses, or phrases may be declared invalid. To this end, the provisions of this Ordinance are declared to be severable.

SECTION 7: Effective Date.

This Ordinance shall take effect and be in full force and effect from and after (30) days after its final passage.

DocuSign Envelope ID: 1AE2284B-D711-4A3A-AB04-2256A8295FC9 7 First read at a regular meeting of the Council of the City of Vallejo held on the 8th day of June, 2021 and finally adopted at a regular meeting of the Council of the City of Vallejo on the 22nd day of June, 2021 by the following vote:

AYES: Mayor McConnell, Vice Mayor Verder-Aliga, Councilmembers Arriola, Brown, Dew, Diaz and Miessner
NOES: None
ABSENT: None
ABSTAIN: None

______________________________________
ROBERT H. MCCONNELL, MAYOR
ATTEST:

______________________________________

DAWN ABRAHAMSON, CITY CLERK

DocuSign Envelope ID: 1AE2284B-D711-4A3A-AB04-2256A8295FC9

Written Communications
Click the links below for written communication received:

Written Communications for Planning Commition Hearing of 3/18/2024:
https://acrobat.adobe.com/id/urn:aaid:sc:VA6C2:0ff31de2-69ed-474d-afd1-652fe810de67 Written Communications for City Council Hearing of 4/23/2024:
https://acrobat.adobe.com/id/urn:aaid:sc:VA6C2:3898c12d-40ec-4b42-8e59-317a2f2a8659 INFORMATIONAL ITEM 10.A.

DATE: April 23, 2024
TO: Mayor and Members of the City Council
FROM: Jason Ta, Interim Chief of Police
SUBJECT: RECEIVE AN UPDATE ON THE DECLARATION OF A STATE AND LOCAL

EMERGENCY RELATED TO PUBLIC SAFETY STAFFING

RECOMMENDATION
Receive an update on the public safety staffing emergency proclamation. This item is for informational purposes only. There is no staff report or action associated with this item.

REASONS FOR RECOMMENDATION

BACKGROUND AND DISCUSSION

FISCAL IMPACT

ENVIRONMENTAL REVIEW

ATTACHMENTS
None

CONTACT
Jason Ta, Interim Police Chief (707) 648-4540
[email protected]

CITY ATTORNEY’S REPORT
April 23, 2024 – City Council Agenda
TO:Mayor and Members of the City Council
FROM:Veronica A. F. Nebb / VN
SUBJECT: Quarterly Report for FY 2023/2024, Third Quarter (January - March 2024)
The following list of projects, work, and statistics represents an overview of the work performed at the City Attorney’s Office during the third quarter of Fiscal Year 2023/2024. Some projects and items have been omitted due to their sensitive nature. If Councilmembers or officials have any questions, please feel free to contact the City Attorney privately, as many of the below items are attorney-client privileged and, therefore, not appropriate for public discussion.

I. Litigation:
a. Number of Pitchess Motions served on the City this FY Quarter: 2 b. Number of Pitchess Motions served on the City this FY: 13 c. Summons & Complaints (New cases this FY Quarter): 4 (see below) File Name Case # Served Date City’s Counsel
Williams, Merrinese v. Thompson, Vernica, et al. CU24-00298 01/25/2024 Kristoffer Jacob, ACA Edwards, Lynda v. City of Vallejo. CU24-00808 02/14/2024 Katelyn Knight, ACA Vincenty, Clifford v. City of Vallejo, et al. CU24-01785 03/20/2024 Kristoffer Jacob, ACA Washington, Arlene v. City of Vallejo, et al. CU24-02149 04/04/2024 Kristoffer Jacob, ACA d. Case Resolutions this FY Quarter: 3 (see below)
File Name Case # Resolved City’s Counsel
Raudelunas, John v. City of Vallejo, et al. 2:21-cv-00394-DAD-JDP 01/29/2024 Katelyn Knight, ACA Root, Robert v. City of Vallejo, et al.. FCS057746 02/06/2024 Kristoffer Jacob, ACA McCoy, Kori, et al. v. City of Vallejo, et al. 2:19-cv-001191-JAM-CKD 03/27/2024 Katelyn Knight, ACA Mayor and Members of the City Council
Re: City Attorney’s Third Quarterly Report for FY 2023/2024 April 23, 2024 - City Council Agenda

Page 2 ends

e. Summons & Complaints (New) Q3 – FY 23/24: 4 Summons & Complaints FY 23/24 to date 15
f. Total Active Litigation Cases as of FY end: 51 (Lit – 38 and NLP – 13)
II. Funds Recovered from Third Parties Q3 – FY 23/24: $0.00 (see details below)
Funds Recovered from Third Parties FY 23/24
to date: $0.00

← All documents from this meeting