Cities Index.
Agenda packet, regular meeting

Vallejo City Council
July 22, 2025

Document
Agenda packet, regular meeting
Meeting
July 22, 2025
Body
Vallejo City Council
Pages
994
Original file
57.4 MB
Text extracted from the city's file for reading and search. Open the original on vallejoca.api.civicclerk.com. That file is the official record.
Page 652 of 994 ends

Caltrans
Farigrounds
Pipeline
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7124
Project Name Caltrans Farigrounds Pipeline
Total Project Cost $41,885 Contact Water Director
Department Water Dept Type IMPROVEMENT - CAPITALIZATION Category Water Status ON HOLD
Useful Life 75 years DISTRICT NO. 4 Yes
Description
This project will add a new 12" pipeline in the Caltrans Right-of-Way (ROW) under Highway 37 in the new divergent diamond interchange.

This will add to scope of work being performed by Caltrans / Solano Transportation Authority (STA) for regional improvement.

Justification
PUBLIC SAFETY / SERVICES: Enhances Other Public Services Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 1 0 0 0 0 0 1
Expenditures 19,336 0 0 0 0 0 0 19,336
Prior Year Expenditures 22,548 0 0 0 0 0 0 22,548
Total 41,884 1 0 0 0 0 0 41,885
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 41,885 0 0 0 0 0 0 41,885
Total 41,885 0 0 0 0 0 0 41,885
Proposed CIP Book FY 2025-26 through 2029-30

Page 154 of 205 ends
Page 653 of 994 ends

Laboratory
Info
Management
Software
Purchase
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7125
Project Name Laboratory Info Management Software Purchase Total Project Cost $250,000 Contact Water Director
Department Water Dept Type EQUIPMENT
Category Water Status ON HOLD
Useful Life 10 years
Description
This project will purchase Water quality Data software.

The software will allow for increased water quality reporting which both the state and federal mandates require additional record keeping. Software package supports multiple users to enter data and prepare reports for state regulators.

Justification
REDUCES LIABILITY: Regulation or Mandate
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 1 0 0 0 0 0 1
Expenditures 196,881 0 0 0 0 0 0 196,881
Prior Year Expenditures 53,118 0 0 0 0 0 0 53,118
Total 249,999 1 0 0 0 0 0 250,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 237,500 0 0 0 0 0 0 237,500
411-Lake Water Systems 12,500 0 0 0 0 0 0 12,500
Total 250,000 0 0 0 0 0 0 250,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 155 of 205 ends
Page 654 of 994 ends

Water
Main
Replacement
FY
2023-
24 25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7126
Project Name Water Main Replacement FY 2023-24
Total Project Cost $1 Contact Water Director
Department Water Dept Type IMPROVEMENT - CAPITALIZATION Category Water Status ON HOLD
Description
This project is for the annual replacement of pipes in the distribution system for FY23 ‐24.

Pipelines in Vallejo are very old and often undersized. Vallejo also suffers from main breaks. Main replacements are needed to reduce main breaks and ensure proper fire-flow capacity.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Expenditures 0 1 0 0 0 0 0 1
Prior Year Expenditures 0 0 0 0 0 0 0 0
Total 0 1 0 0 0 0 0 1
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 400,001 -400,000 0 0 0 0 0 1
Total 400,001 -400,000 0 0 0 0 0 1
Proposed CIP Book FY 2025-26 through 2029-30

Page 156 of 205 ends
Page 655 of 994 ends

Cache
Main
&
Pump
Station
Rehabilitation
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7127
Project Name Cache Main & Pump Station Rehabilitation
Total Project Cost $200,000 Contact Water Director
Department Water Dept Type EQUIPMENT
Category Water Status CONSTRUCTION
Useful Life 20 years
Description
This project will rehabilitate the existing Cache Main raw water pipeline and the raw water. As a parallel, restoring capacity and efficiency of the Cache Slough pump station will bring an independent source of water from the North Bay Aqueduct and restore original design capacity.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 1 0 0 0 0 0 1
Expenditures 85,919 0 0 0 0 0 0 85,919
Prior Year Expenditures 114,080 0 0 0 0 0 0 114,080
Total 199,999 1 0 0 0 0 0 200,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 200,000 0 0 0 0 0 0 200,000
Total 200,000 0 0 0 0 0 0 200,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 157 of 205 ends
Page 656 of 994 ends

Lake
Water
System
Auxillary
Pump
Supply
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7128
Project Name Lake Water System Auxillary Pump Supply
Total Project Cost $239,531 Contact Water Director
Department Water Dept Type IMPROVEMENT - CAPITALIZATION Category Water Status CONSTRUCTION
Useful Life 20 years
Description
This project will provide the construction of a series of pump stations and tanks to enable the Fleming Hill Water Treatment plant to supply the Lakes Water System capacity.

There is no auxiliary treatment plant capacity for the Lakes Water System. Anticipated growth in the area will justify and eventually fund this project.

Justification
PUBLIC SAFETY / SERVICES: Enhances Other Public Services Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 1 0 0 0 0 0 1
Expenditures 33,811 0 0 0 0 0 0 33,811
Prior Year Expenditures 205,719 0 0 0 0 0 0 205,719
Total 239,530 1 0 0 0 0 0 239,531
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 411-Lake Water Systems 700,000 -460,469 0 0 0 0 0 239,531 Total 700,000 -460,469 0 0 0 0 0 239,531
Proposed CIP Book FY 2025-26 through 2029-30

Page 158 of 205 ends
Page 657 of 994 ends

Water
Main
Install
under
HWY
80 at
Coach
&
Turner
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7129
Project Name Water Main Install under HWY 80 at Coach & Turner Total Project Cost $1 Contact Water Director
Department Water Dept Type IMPROVEMENT - CAPITALIZATION Category Water Status Inactive
Useful Life 75 years
Description
This project will support Retail development of Solano 360 and Costco relocation and new residential development via the South Trans Vallejo Pipeline. The Water Main is under HWY 80 at Coach and Turner.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Prior Year Expenditures 0 1 0 0 0 0 0 1
Total 0 1 0 0 0 0 0 1
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 1 0 0 0 0 0 0 1
Total 1 0 0 0 0 0 0 1
Proposed CIP Book FY 2025-26 through 2029-30

Page 159 of 205 ends
Page 658 of 994 ends

Summit
Reservoir
Rehabilitation
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7130
Project Name Summit Reservoir Rehabilitation
Total Project Cost $325,000 Contact Water Director
Department Water Dept Type MAINTENANCE & REPAIR
Category Water Status ON HOLD
Useful Life 20 years DISTRICT NO. 2 Yes
Description
This project will provide repairs to the Summit Reservoir per the Department of Safety of Dams annual inspection.

This is a State Agency Compliance mandate.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 85,807 75,000 150,000 0 0 0 310,807
Expenditures 14,193 0 0 0 0 0 0 14,193
Prior Year Expenditures 0 0 0 0 0 0 0 0
Total 14,193 85,807 75,000 150,000 0 0 0 325,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 100,000 0 75,000 150,000 0 0 0 325,000 Total 100,000 0 75,000 150,000 0 0 0 325,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 160 of 205 ends
Page 659 of 994 ends

Water
Main
Replacement
FY
2024-
25 25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7131
Project Name Water Main Replacement FY 2024-25
Total Project Cost $1 Contact Water Director
Department Water Dept Type IMPROVEMENT - CAPITALIZATION Category Water Status ON HOLD
Useful Life 75 years
Description
This project is for the annual replacement of pipes in the distribution system for FY24 ‐25.

Pipelines in Vallejo are very old and often undersized. Vallejo also suffers from main breaks. Main replacements are needed to reduce main breaks and ensure proper fire-flow capacity.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Prior Year Expenditures 0 1 0 0 0 0 0 1
Expenditures 0 0 0 0 0 0 0 0
Preliminary 0 0 0 0 0 0 0 0
Total 0 1 0 0 0 0 0 1
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 15,001 -15,000 0 0 0 0 0 1
Total 15,001 -15,000 0 0 0 0 0 1
Proposed CIP Book FY 2025-26 through 2029-30

Page 161 of 205 ends
Page 660 of 994 ends

Water
Main
Replacement
FY
2025-
26 25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7132
Project Name Water Main Replacement FY 2025-26
Total Project Cost $1 Contact Water Director
Department Water Dept Type IMPROVEMENT - CAPITALIZATION Category Water Status ON HOLD
Description
This project is for the annual replacement of pipes in the distribution system for FY25-26..

Pipelines in Vallejo are very old and often undersized. Vallejo also suffers from main breaks. Main replacements are needed to reduce main breaks and ensure proper fire-flow capacity.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 1 0 0 0 0 0 1
Expenditures 0 0 0 0 0 0 0 0
Prior Year Expenditures 0 0 0 0 0 0 0 0
Total 0 1 0 0 0 0 0 1
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 411-Lake Water Systems 0 0 0 0 0 0 0 0
404-City Water Systems 15,001 -15,000 0 0 0 0 0 1
Total 15,001 -15,000 0 0 0 0 0 1
Proposed CIP Book FY 2025-26 through 2029-30

Page 162 of 205 ends
Page 661 of 994 ends

Water
Main
Replacement
FY
2026-
27 25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7133
Project Name Water Main Replacement FY 2026-27
Total Project Cost $3,000,000 Contact Water Director
Department Water Dept Type Unassigned
Category Water Status ON HOLD
Description
This project is for the annual replacement of pipes in the distribution system for FY26-27.

Pipelines in Vallejo are very old and often undersized. Vallejo also suffers from main breaks. Main replacements are needed to reduce main breaks and ensure proper fire-flow capacity.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 0 3,000,000 0 0 0 0 3,000,000
Expenditures 0 0 0 0 0 0 0 0
Prior Year Expenditures 0 0 0 0 0 0 0 0
Total 0 0 3,000,000 0 0 0 0 3,000,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 15,000 -15,000 3,000,000 0 0 0 0 3,000,000 Total 15,000 -15,000 3,000,000 0 0 0 0 3,000,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 163 of 205 ends
Page 662 of 994 ends

Lake
System
Master
Plan
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7134
Project Name Lake System Master Plan
Total Project Cost $400,000 Contact Water Director
Department Water Dept Type MAINTENANCE & REPAIR
Category Water Status ON HOLD
Description
This project is for the Master Plan for the Lakes Water System to identify future demands and indentify infrastructure needs.

The Master Plan for the Lakes Water System is a required document to establish long term capital funding.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 0 0 200,000 200,000 0 0 400,000
Expenditures 0 0 0 0 0 0 0 0
Prior Year Expenditures 0 0 0 0 0 0 0 0
Total 0 0 0 200,000 200,000 0 0 400,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 411-Lake Water Systems 0 0 0 200,000 200,000 0 0 400,000 Total 0 0 0 200,000 200,000 0 0 400,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 164 of 205 ends
Page 663 of 994 ends

McGary
-
Cache
Main
Rehabilitation
&
Replacement
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7135
Project Name McGary - Cache Main Rehabilitation & Replacement Total Project Cost $5,528,975 Contact Water Director
Department Water Dept Type EQUIPMENT
Category Water Status DESIGN
Useful Life 20 years
Description
This project is to realign the existing Water Main between the Cordelia Reservoir and the Summit Reservoir.

Realigning the existing Water Main will make the alignment less prone to seismic damage.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 13,546 1,000,000 2,000,000 2,000,000 0 0 5,013,546 Expenditures 0 0 0 0 0 0 0 0
Prior Year Expenditures 515,429 0 0 0 0 0 0 515,429
Total 515,429 13,546 1,000,000 2,000,000 2,000,000 0 0 5,528,975 Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 528,975 0 1,000,000 2,000,000 2,000,000 0 0 5,528,975 Total 528,975 0 1,000,000 2,000,000 2,000,000 0 0 5,528,975 Proposed CIP Book FY 2025-26 through 2029-30

Page 165 of 205 ends
Page 664 of 994 ends

Green
Valley
Line
Rehabilitiation
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7136
Project Name Green Valley Line Rehabilitiation
Total Project Cost $2,500,000 Contact Water Director
Department Water Dept Type IMPROVEMENT - CAPITALIZATION Category Water Status DESIGN
Description
This project will rehabilitate a 14" Green Valley Water Main along an existing alignment.

The existing pipeline is over 100 years old and past its useful life. This will addresses numerous main breaks caused by this pipeline.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 500,000 2,000,000 0 0 0 0 2,500,000
Expenditures 0 0 0 0 0 0 0 0
Prior Year Expenditures 0 0 0 0 0 0 0 0
Total 0 500,000 2,000,000 0 0 0 0 2,500,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 411-Lake Water Systems 500,000 0 2,000,000 0 0 0 0 2,500,000 Total 500,000 0 2,000,000 0 0 0 0 2,500,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 166 of 205 ends
Page 665 of 994 ends

Mud
Press
Roof
Replacement
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7137
Project Name Mud Press Roof Replacement
Total Project Cost $235,000 Contact Water Director
Department Water Dept Type IMPROVEMENT - CAPITALIZATION Category Water Status COMPLETED
Useful Life 20 years
Description
This project will replace the existing roof at the Mud Press Structure.

The Mud Press building roof is leaking.

Justification
MAINTAINS INVESTMENT: Increase Useful Life
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 1 0 0 0 0 0 1
Expenditures 26,909 0 0 0 0 0 0 26,909
Prior Year Expenditures 208,090 0 0 0 0 0 0 208,090
Total 234,999 1 0 0 0 0 0 235,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 235,000 0 0 0 0 0 0 235,000
Total 235,000 0 0 0 0 0 0 235,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 167 of 205 ends
Page 666 of 994 ends

Shadow
Ridge
Hydro
Pump
Station
Upgrade
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7138
Project Name Shadow Ridge Hydro Pump Station Upgrade
Total Project Cost $1,600,000 Contact Water Director
Department Water Dept Type EQUIPMENT
Category Water Status ON HOLD
Useful Life 20 years
Description
Replace existing equipment and facilities. Existing Equipment is over 20 years old and no longer supported in the industry.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 0 0 0 200,000 1,400,000 0 1,600,000
Total 0 0 0 0 200,000 1,400,000 0 1,600,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 0 0 0 0 200,000 1,400,000 0 1,600,000 Total 0 0 0 0 200,000 1,400,000 0 1,600,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 168 of 205 ends
Page 667 of 994 ends

Monticello
Pump
Station
Upgrade
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7139
Project Name Monticello Pump Station Upgrade
Total Project Cost $1 Contact Water Director
Department Water Dept Type IMPROVEMENT - CAPITALIZATION Category Water Status ON HOLD
Useful Life 20 years
Description
Upgrade existing pumps and pump station to support increased pipe capacity from emergency upgrade in 2014. Existing pump station was compatible with 24- inch main prior to 42-inch main up size in 2014. Upgrade to pump station will increase capacity to support 42-inch main.

Justification
REDUCES LIABILITY: Regulation or Mandate
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Prior Year Expenditures 0 1 0 0 0 0 0 1
Preliminary 0 0 0 0 0 0 0 0
Total 0 1 0 0 0 0 0 1
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 1 0 0 0 0 0 0 1
Total 1 0 0 0 0 0 0 1
Proposed CIP Book FY 2025-26 through 2029-30

Page 169 of 205 ends
Page 668 of 994 ends

Fleming
Hill
Ozone
Improvements
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7140
Project Name Fleming Hill Ozone Improvements
Total Project Cost $2,150,000 Contact Water Director
Department Water Dept Type MAINTENANCE & REPAIR
Category Water Status ON HOLD
Useful Life 20 years DISTRICT NO. 4 Yes
Description
Upgrade and replacement of existing system due to age and technological advancement. Service life on existing equipment has expired.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 0 0 150,000 1,000,000 1,000,000 0 2,150,000 Total 0 0 0 150,000 1,000,000 1,000,000 0 2,150,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 0 0 0 150,000 1,000,000 1,000,000 0 2,150,000 Total 0 0 0 150,000 1,000,000 1,000,000 0 2,150,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 170 of 205 ends
Page 669 of 994 ends

Swanzy
Reservoir
Improvements
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7141
Project Name Swanzy Reservoir Improvements
Total Project Cost $900,000 Contact Water Director
Department Water Dept Type MAINTENANCE & REPAIR
Category Water Status ON HOLD
DISTRICT NO. 6 Yes
Description
The project provides rehabilitation and upgrades to the Swanzy Reservoir.

Justification
REDUCES LIABILITY: Regulation or Mandate
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 331,720 0 150,000 200,000 200,000 0 881,720 Expenditures 18,280 0 0 0 0 0 0 18,280
Prior Year Expenditures 0 0 0 0 0 0 0 0
Total 18,280 331,720 0 150,000 200,000 200,000 0 900,000 Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 350,000 0 0 150,000 200,000 200,000 0 900,000 Total 350,000 0 0 150,000 200,000 200,000 0 900,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 171 of 205 ends
Page 670 of 994 ends

Fleming
Hill
Pipe
and
Pump
Replacement
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7142
Project Name Fleming Hill Pipe and Pump Replacement
Total Project Cost $2,200,000 Contact Water Director
Department Water Dept Type MAINTENANCE & REPAIR
Category Water Status ON HOLD
DISTRICT NO. 4 Yes
Description
The project is a replacement program for the critical infrastructure at the Fleming Hill Water Treatment Plant.

Justification
MAINTAINS INVESTMENT: Increase Useful Life
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 8,227 500,000 1,000,000 250,000 250,000 0 2,008,227 Expenditures 141,722 0 0 0 0 0 0 141,722
Prior Year Expenditures 50,051 0 0 0 0 0 0 50,051
Total 191,773 8,227 500,000 1,000,000 250,000 250,000 0 2,200,000 Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 200,000 0 500,000 1,000,000 250,000 250,000 0 2,200,000 Total 200,000 0 500,000 1,000,000 250,000 250,000 0 2,200,000 Proposed CIP Book FY 2025-26 through 2029-30

Page 172 of 205 ends
Page 671 of 994 ends

Fleming
Hill
Storage
and
Office
Upgrades
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7143
Project Name Fleming Hill Storage and Office Upgrades
Total Project Cost $250,000 Contact Water Director
Department Water Dept Type IMPROVEMENT - CAPITALIZATION Category Water Status ON HOLD
DISTRICT NO. 4 Yes
Description
The project will provide storage expansion for facilities and operations at Fleming Hill Water Treatment Plant.

Justification
PUBLIC SAFETY OR SERVICES: Enhances Other Public Services Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 250,000 0 0 0 0 0 250,000
Expenditures 0 0 0 0 0 0 0 0
Prior Year Expenditures 0 0 0 0 0 0 0 0
Total 0 250,000 0 0 0 0 0 250,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 250,000 0 0 0 0 0 0 250,000
Total 250,000 0 0 0 0 0 0 250,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 173 of 205 ends
Page 672 of 994 ends

Cordelia
Pump
Station
Upgrade
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7144
Project Name Cordelia Pump Station Upgrade
Total Project Cost $1 Contact Water Director
Department Water Dept Type EQUIPMENT
Category Water Status ON HOLD
Description
The project provides upgrades and replacements of existing pumps and electrical systems at the Cordelia Complex.

Justification
MAINTAINS INVESTMENT: Renew Aged Infrastructure
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Prior Year Expenditures 0 1 0 0 0 0 0 1
Preliminary 0 0 0 0 0 0 0 0
Total 0 1 0 0 0 0 0 1
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 1 0 0 0 0 0 0 1
Total 1 0 0 0 0 0 0 1
Proposed CIP Book FY 2025-26 through 2029-30

Page 174 of 205 ends
Page 673 of 994 ends

Terminal
Reservoir
Pump
Station
Improvements
25-26 thru 29-30
Capital Improvement Plan
Vallejo, CA
Project # WT7145
Project Name Terminal Reservoir Pump Station Improvements Total Project Cost $2,000,000 Contact Water Director
Department Water Dept Type MAINTENANCE & REPAIR
Category Water Status DESIGN
Description
The project provides the replacement of valves and site improvements to the pump station facility.

Justification
MAINTAINS INVESTMENT: Increase Useful Life
Expenditures Prior 25-26 26-27 27-28 28-29 29-30 Future Total Preliminary 0 800,000 200,000 1,000,000 0 0 0 2,000,000 Expenditures 0 0 0 0 0 0 0 0
Prior Year Expenditures 0 0 0 0 0 0 0 0
Total 0 800,000 200,000 1,000,000 0 0 0 2,000,000
Funding Sources Prior 25-26 26-27 27-28 28-29 29-30 Future Total 404-City Water Systems 800,000 0 200,000 1,000,000 0 0 0 2,000,000 Total 800,000 0 200,000 1,000,000 0 0 0 2,000,000
Proposed CIP Book FY 2025-26 through 2029-30

Page 175 of 205 ends
Page 674 of 994 ends

This Page Intentionally Left Blank
Proposed CIP Book FY 2025-26 through 2029-30

Page 176 of 205 ends
Page 675 of 994 ends

Appendix – Planning Commission
Resolution No. PC25-06

Proposed CIP Book FY 2025-26 through 2029-30

Page 177 of 205 ends
Page 676 of 994 ends

Proposed CIP Book FY 2025-26 through 2029-30

Page 178 of 205 ends
Page 677 of 994 ends

STAFF REPORT – PLANNING

CITY OF VALLEJO

PLANNING COMMISSION

DATE: April 21, 2025
TO: Mayor and Members of the City Council
FROM: Melissa Tigbao, PE, Public Works Director
SUBJECT: ADOPT A RESOLUTION FINDING THE PROJECT TO BE EXEMPT FROM THE

PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) GUIDELINE SECTION 15378 AND FINDING THE PROPOSED PROJECTS FOR THE

CAPITAL IMPROVEMENT PLAN CONFORMANCE WITH THE CITY OF VALLEJO GENERAL PLAN 2040

RECOMMENDATION
Adopt a resolution finding the project to be exempt from the provisions of the California Environmental Quality Act (CEQA) Guideline Section 15378 and finding the proposed projects for the Capital Improvement plan conformance with the City of Vallejo General Plan 2040.

REASONS FOR RECOMMENDATION
The City’s Capital Improvement Program (CIP) is an important planning tool that identifies infrastructure and other public facility projects, cost, funding mechanisms, and priorities for execution. The CIP is adopted for a five-year period and updated annually to show unspent funds for projects not yet completed and to add a new year to the cycle. It also reflects any changes in the priorities for projects that have not yet started. Each year, pursuant to California Government Code Section 65401, the Planning Commission must review the “ensuing fiscal year” of the CIP for conformance with the City’s General Plan and convey its findings to the City Council.

The Commission’s review is limited to General Plan conformance and does not include recommendations on the projects (except as related to General Plan conformance), priorities or budget projections of the CIP.

Following this hearing, the City Council will conduct its own hearing and make a determination as to final adoption of the revised FY 2024-25 CIP.

BACKGROUND AND DISCUSSION
Capital improvements are those individual construction projects and purchases of land, equipment, and contract services that cost more than $50,000. Capital improvement planning is one of the main ways communities implement the General Plan. CIP funding priorities reflect community values, needs, desired services and projects and resources to accomplish them.

The objectives of the CIP are as follows:
• To provide increased planning and coordination of CIP projects • To relate the planning of CIP projects more effectively to general City goals and fiscal capability • To assist City staff in projecting impacts on future workload requirements, department programs and the City’s operating budget
• To ensure conformance of the capital projects with the City’s General Plan • To allocate resources to the City’s highest priority projects • To identify funding shortfalls and develop funding strategies

The CIP forecasts the City’s proposed major projects over the next five years. The capital needs for the City exceed the amount of available (and anticipated) revenue, therefore, the CIP includes both funded and unfunded projects to capture the full needs of the City and enable the City Council to prioritize the projects.

Proposed CIP Book FY 2025-26 through 2029-30

Page 179 of 205 ends
Page 678 of 994 ends

Date: April 21, 2025
Subject: ADOPT A RESOLUTION FINDING THE PROJECT TO BE EXEMPT FROM THE

PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) GUIDELINE SECTION 15378 AND FINDING THE PROPOSED PROJECTS FOR THE

CAPITAL IMPROVEMENT PLAN CONFORMANCE WITH THE CITY OF VALLEJO GENERAL PLAN 2040

Page 2 ends

Pursuant to California Government Code Section 66002(a), the CIP includes the location, size, time of availability, and estimated costs for all improvements.

On August 29, 2017, the City Council adopted General Plan 2040, a comprehensive statement of the City’s land use policies for the next 25 years. The Planning Commission’s task relative to the CIP is to review the first year of the CIP and determine whether it conforms with the General Plan. Staff has provided the following documents to aid the Commission in this task:

• A resolution finding that the proposed FY 2025-26 CIP conforms with the General Plan (Attachment 1); • A General Plan “conformance matrix: which identifies applicable General Plan policies for each new project in the FY 2025-26 CIP (Attachment 2)
• The full text of the General Plan policies related to the new project (Attachment 3)

CONFORMANCE WITH THE GENERAL PLAN
Staff has conducted an audit of General Plan policies and has prepared the attached matrix (Attachment 2) to document how each proposed new capital improvement project conforms with the City’s General Plan. In general, each CIP item implements a program or policy in the General Plan, which are identified by policy number and description for reference in the attached matrix.

The General Plan has a time frame spanning the next 22 years, however, the City Council prioritizes and allocates limited resources every year. Not all General Plan goals or plans may be funded during each year of the CIP. The City Council ultimately decides spending priorities and determines if they are in harmony with the General Plan. Consequently, the proposed CIP does not spread City capital funding equally among all plan areas but must prioritize funding based on the City Council’s assessment of community needs and priorities.

While a five-year future cost is forecast, the Council adopts fund allocations for a single-year CIP, so future years are not shown on the attached matrix.

There can sometimes be a concern that the amount budgeted for capital projects may not be adequate to support projected community growth. Conversely, another concern is that capital improvements might facilitate growth that exceeds planned levels, leading to development that is disorderly or adversely impacts the environment. Staff has reviewed the proposed CIP and finds no evidence that it will preclude the City from accommodating the growth envisioned in the General Plan or cause any growth-management thresholds to be exceeded.

There are a few additional CIP projects not up for FY2025-26 Budget Appropriations but still need General Plan conformance since they will be going in front of City Council for FY2024-25 Budget Amendments as new CIP projects and therefore are being included in this Planning Commission item.

FISCAL IMPACT
The projects identified in the CIP are funded through a variety of mechanisms including grants, fees, gas tax, etc. Each project in the CIP document identifies the funding source(s) for that project to be allocated over the course of the five-year planning period. The City Council will authorize specific funding sources and amounts as part of the budget process, or at the time of individual project approval.

ENVIRONMENTAL REVIEW
Proposed CIP Book FY 2025-26 through 2029-30

Page 180 of 205 ends
Page 679 of 994 ends

Date: April 21, 2025
Subject: ADOPT A RESOLUTION FINDING THE PROJECT TO BE EXEMPT FROM THE

PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) GUIDELINE SECTION 15378 AND FINDING THE PROPOSED PROJECTS FOR THE

CAPITAL IMPROVEMENT PLAN CONFORMANCE WITH THE CITY OF VALLEJO GENERAL PLAN 2040

Page 3 ends

This action is exempt from the California Environmental Quality Act (CEQA) because it is not a project which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, pursuant to CEQA Guideline Section 15378, therefore no further review is required. CEQA review is conducted for individual projects at the time of project approval.

ATTACHMENTS

1. Recommended Resolution

2. FY25-26 CIP CP Conform Matrix

3. FY25-26 General Plan Policies

CONTACT
Melissa Tigbao, PE, Public Works Director
(707) 648-4326 | [email protected]

Proposed CIP Book FY 2025-26 through 2029-30

Page 181 of 205 ends
Page 680 of 994 ends

1 ATTACHMENT 1

CITY OF VALLEJO PLANNING COMMISSION RESOLUTION
NO. PC 25-XX N.C.

A RESOLUTION OF THE PLANNING COMMISSION F INDING THE PROPOSED CAPITAL

IMPROVEMENT PLAN NEW PROJECTS TO BE IN CONFORMANCE WITH THE GENERAL PLAN * * * * * * * * * * * * * * * * * * * * * * * * *
BE IT RESOLVED by the Planning Commission of the City of Vallejo as follows:

WHEREAS, the City of Vallejo Capital Improvement Plan (CIP) is a five-year program adjusted annually that outlines public improvements and estimated expenditures to construct these improvements; and
WHEREAS, a proposed CIP has been developed for the 2025-30 time period for City Council review and adoption; and
WHEREAS, California Government Code Section 65401 requires the City’s Planning Commission to determine whether the “ensuing fiscal year” of the CIP (Fiscal Year, or FY, 2025-26 in this case) is in conformance with the City’s General Plan, and to report its determination to the City Council; and WHEREAS, in accordance with the California Environmental Quality Act (CEQA), the Planning Commission’s action to determine whether a proposed new or modified CIP project is in conformance with the General Plan is not subject to CEQA pursuant to CEQA Guidelines Section 15378 in that General Plan conformance findings required by State law are not a project as defined under CEQA; and
WHEREAS, there are a few additional CIP projects not up for FY2=2025-26 Budget Appropriations but still need General Plan conformance since they will be going in front of City Council for FY2024- 25 Budget Amendments as new CIP projects and therefore are being included in this Planning Commission item; and
WHEREAS, on April 21, 2025, the Planning Commission held a duly noticed public hearing on the proposed CIP for FY 2025-26 during which interested persons had an opportunity to testify; and WHEREAS, at the April 21, 2025, Planning Commission meeting, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, the Commission considered all evidence relating to the consistency of the FY 2025-26 CIP with the General Plan.

NOW THEREFORE, the Planning Commission of the City of Vallejo hereby finds, determines, and resolves as follows:

Section 1: The Planning Commission has duly considered the full record before it on this matter, which includes but is not limited to such things as the City staff report, the FY 2025-26 CIP, testimony by staff and the public (if any), and any other materials or evidence submitted or provided to the Commission. Furthermore, the recitals set forth above are found to be true and correct and are incorporated herein by reference.

Section 2: This action is not subject to the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15378, since it is not a “project” as defined under CEQA.

Proposed CIP Book FY 2025-26 through 2029-30

Page 182 of 205 ends
Page 681 of 994 ends

2 Section 3: The proposed FY 2025-2026 CIP conforms with the Vallejo General Plan 2040.

PASSED AND ADOPTED at a regular meeting of the Planning Commission of the City of Vallejo, State of California, on the 21ST day of April 2025, by the following vote to-wit:

AYES: NOES:

ABSENT:

ATTEST:

Eric Blind, CHAIRPERSON
City of Vallejo Planning Commission
Kristin Pollot, PLANNING & DEVELOPMENT SERVICES DIRECTOR City of Vallejo Planning Commission
Proposed CIP Book FY 2025-26 through 2029-30

Page 183 of 205 ends
Page 682 of 994 ends

Attachment 2
FY24-25 General Plan-CIP Conformance Matrix
`
Category Project ID Project Name Description Location
Vallejo General Plan 2040
Chapter Topical Area
Applicable
Goals/Policies (all are
policies unless
otherwise
noted)
New Infrastructure MP2025 Streets Paving 2025 Measure P Project
This project is part of a 10 year plan to rehabilitate
the City's streets. Repairing deteriorating roads
and maintaining is the purpose of this project for
fiscal year 2024-25 where the construction work
will start in May or June of 2025.

Citywide
(specific list will be
presented to Measure
P committee and to
City Council prior to
any construction
award)
Mobility, Transportation,
& Connectivity
Citywide Mobility,
Pavement Condition,
Sustainable
Transportation
MTC-2.4, MTC-2.6, MTC-

2.11 New Infrastructure MP2026 Streets Paving 2026 Measure P Project
This project is part of a 10 year plan to rehabilitate
the City's streets. Repairing deteriorating roads
and maintaining is the purpose of this project for
fiscal year 2025-26.

Citywide
(specific list will be
presented to Measure
P committee and to
City Council prior to
any construction
award)
Mobility, Transportation,
& Connectivity
Citywide Mobility,
Pavement Condition,
Sustainable
Transportation
MTC-2.4, MTC-2.6, MTC-

2.11 New Infrastructure PW9714 Fifth Street Bike & Pedestrian Safety Grant Project
Project involves design and implementation of
measures to calm traffic and create a 'slow street'
environment safe for cycling and pedestrians.

Fifth Street from
Solano Ave to
Sequoia Ave.

Community & People
Mobility, Transportation,
& Connectivity
Active Transportation
Network
Safety First, Citywide
Mobility, Sustainable
Transportation
CP-1.6, MTC‐2.1,
MTC‐2.4, MTC-2.11
New Infrastructure PW9715 Road Edgeline Project
Adding white edgelines to local collector streets as
an appropriate lanes, avoiding sideswipe
accidents. This project is expected to be
implemented in coordination with Vallejo's
increased roadway pavement management
program and on-call roadway re-striping program.

Major Collector streets
including Admiral
Callaghan Lane,
Ascot Parkway,
Benicia Road, Borges
Lane, Camino Alto,
Corcoran Ave., Florida
Street, Glen Cove
Parkway, Nebraska
Street, and Whitney
Ave.

Mobility, Transportation,
& Connectivity
Safety First, Citywide
Mobility, Sustainable
Transportation
MTC‐2.1, MTC‐2.4, MTC-

2.11 New Infrastructure PW9716 Joint City-County Sidewalk Project
Solano County and City of Vallejo collaboration
focusing on bridging sidewalk connection gaps
between unincorporated and incorporated sections
of Vallejo.

Homeacres/Starr
Subdivision area, with
other locations to be
added at a later date
Community & People
Economy, Education, &
Training
Mobility, Transportation,
& Connectivity
Active Transportation
Network
Municipal Services
First/Last Mile
Connections, Citywide
Mobility, Coordinated
Transportation Planning
CP-1.6, EET-1.9, MTC-1.3,
MTC‐2.4, MTC-3.1
Proposed CIP Book FY 2025-26 through 2029-30

Page 184 of 205 ends
Page 683 of 994 ends

Attachment 2
FY24-25 General Plan-CIP Conformance Matrix
`
New Infrastructure PWC117 Grind & Paving Project This project is for roadways needing major rebuilding (grind & paving).

Citywide
(specific list will be
presented to City
Council prior to any
construction award)
Mobility, Transportation,
& Connectivity
Citywide Mobility,
Pavement Condition,
Sustainable
Transportation
MTC-2.4, MTC-2.6, MTC-

2.11 Category Project ID Project Name Description Location Vallejo General Plan 2040
Chapter Topical Area
Applicable
Goals/Policies (all are
policies unless
otherwise
noted)
Proposed CIP Book FY 2025-26 through 2029-30

Page 185 of 205 ends
Page 684 of 994 ends

1 ATTACHMENT 3
GENERAL PLAN 2040 POLICIES RELATED TO

CAPITAL IMPROVEMENTS, PUBLIC FACILITIES AND

INFRASTRUCTURE
Chapter 3 – Community & People
POLICY CP-1.6 Active Transportation Network. Promote the health benefits of walking and bicycling by providing a convenient and safe network of bicycle paths and routes, sidewalks, pedestrian paths, and trails, including connections with major destinations such as civic facilities, educational institutions, employment centers, shopping, and recreation areas.
• Action CP-1.6A. Identify problem locations in Vallejo regarding pedestrian/auto and bicycle/auto collisions, identify measures (e.g., traffic calming, improved street lighting) to reduce collisions, and develop a prioritized program for implementing identified measures.
• Action CP-1.6B. Support and expand Vallejo’s Safe Routes to Schools program in collaboration with the VCUSD, Vallejo Police Department, Solano Public Health, and Solano Transportation Authority (STA). • Action CP-1.6D. Develop guidelines for public and private projects that promote safe, convenient, and attractive bike and pedestrian facilities, including amenities to enhance bike and pedestrian activity, such as bicycle racks, lockers, street trees, public art, and street furniture.

Chapter 5 – Economy, Education, & Training
POLICY EET-1.9 Municipal Services. Provide robust, high-quality municipal services and build revenue to achieve a self-sustaining model of funding.
• Action EET-1.9A. Continue to partner with public agencies to enhance Vallejo's infrastructure, including active transportation and transit connections and facilities, and services needed for new development and investment.

Chapter 6 – Mobility, Transportation, & Connectivity
POLICY MTC-1.3 First/Last Mile Connections. Provide enhancements to the local transit network that make it easier and more convenient to use regional transit. • Action MTC-1.3A. Pursue One Bay Area grants and other funding to better connect regional transit and the local bicycle and pedestrian network, including through physical infrastructure, wayfinding signage, and real-time information displays.

POLICY MTC-2.1 Safety First. Prioritize pedestrian, bicycle, and automobile safety over traffic flow.

Proposed CIP Book FY 2025-26 through 2029-30

Page 186 of 205 ends
Page 685 of 994 ends

2 • Action MTC-2.1A. Prepare a citywide Bicycle and Pedestrian Master Plan that builds on the 1998 Plan, identifies improvements needed to close gaps in the network and work toward a “Vision Zero” target for eliminating traffic fatalities and reducing non-fatal collisions.
• Action MTC-2.1B. Prioritize completion of sidewalk and bicycle projects listed in the Bicycle and Pedestrian Master Plan as City resources allow. • Action MTC-2.1C. Establish a neighborhood traffic-calming program to involve residents in identifying issues on neighborhood streets and actions to address them.

POLICY MTC-2.4 Citywide Mobility. Maintain a transportation network that provides mobility for all ages and abilities and for all areas of the community. • Action MTC-2.4A. Annually update and prioritize the Capital Improvement Program list of roadway and transportation improvements needed to support all modes of travel in Vallejo.

POLICY MTC-2.6 Pavement Condition. Improve street pavement condition in Vallejo, prioritizing neighborhood corridors and arterials.
• Action MTC-2.6A. Target neighborhood corridors, commercial corridors, and arterial segments that have a pavement condition index (PCI) of 50 or less and enhance economic development opportunities as top priorities and seek funding for improvements.

POLICY MTC-2.11 Sustainable Transportation. Ensure that circulation improvements can be operated and maintained within existing and future resource limitations. • Action MTC-2.11A. Annually review transportation projects in the City’s Capital Improvement Program to ensure that near-term priorities are achievable given available resources.

POLICY MTC-3.1 Coordinated Transportation Planning. Ensure that improvements to the transportation network support a land use pattern that connects the community and facilitates travel among Vallejo’s neighborhoods.
• Action MTC-3.1A. Work with Caltrans, Solano County, Soltrans, and the Solano Transportation Authority to identify and seek funding for improvements that make intra- city travel easier, including for transit, bicycles, and pedestrians. • Action MTC-3.1B. Synchronize improvements to the local street network with planned expansion of the County bicycle network and the regional trail system in Vallejo. • Action MTC-3.1C. Involve residents, businesses, and other community members in choosing among options for street improvement projects to create a stronger sense of place and neighborhood ownership in the design of roads, streetscapes, and other transportation related facilities.

Proposed CIP Book FY 2025-26 through 2029-30

Page 187 of 205 ends
Page 686 of 994 ends

Appendix – CIP Status Definitions

To monitor each project’s progression, the status of each pr oject as of the fiscal year's
commencement will be recorded.

An explanation of the definition for each status is provided below to aid in the understanding when
reviewing each project page.

Study

The status of study is for a project which will study
situations within the City in order to make
recommendations on what design styles or mechanisms
should be used for the implementation of future projects.

Pilot

The status of pilot is for a project that is new
to the City and
is being tested to verify if the program will work.

Design

The status of design encompasses not
only the design
portion of the project
but also all aspects prior to the
construction portion of the project. If a more detailed sta tus
is needed, such as environment
al status or preliminary
engineering status, then it is
advised to reach out to the
Department / Division manag
ing the individual project to
gain the additional necessary detai
ls.

Construction

The status of construction is
for the actual construction of a
project and starts with t
he bid process of the construction.

On-Going Design /
Construction

The status of on-going design and construction r
eflects a
parent project that encompasses
multiple subprojects.

These subprojects may be in variou
s stages of design,
construction, or other phases of
development. As a result,
the overall status includes multiple design and construction activities occurring simultaneously.

If more detailed
information is needed about
a specific subproject within the
larger parent project, we recom
mend contacting the
Department or Division respon
sible for managing that
individual project for the most accurate information.

Equipment

The status of equipment is for an
improvement to the
equipment, or new equipment, which is a minimum of
$50,000 or useful life of at least 10 years.

On Hold

The status of on-hold is for any project that
is currently on-
hold and awaiting further funding
, instructions, and/or
information.

Completed – Not Closed

The status of completed – not closed is for any project where the construction work i
s completed but the
paperwork is not finalized and
therefore the project is not
fully closed.

Archived

The status of archived is for any
project fully completed and
closed with no funding or remai
ning work to be done.

Proposed CIP Book FY 2025-26 through 2029-30

Page 188 of 205 ends
Page 687 of 994 ends

Append
ix – List of
Funds

The Cit
y’s finances are structured
in a variety of funds, which are the basic accounting and repor
ting entities in governmen
tal accounting. The funds in this list are identified as potential fundi
ng sources for capital improve
ment projects.

Fund
# Fund
name Fund
Type Respo
nsible
Depart
ment/Division
001-005 General
Fund General
Fund Various
101 Commun
ity Development Block
Gran
t
Speci
al Revenue Housi
ng and Community
Devel
opment
106 Mare
Island Conversion Capi
tal Proj
ect Economic De
velopment
107 Mare
Island Base Reuse Speci
al Revenue Economic De
velopment
112 Mare
Island CFD 2002 Speci
al Revenue Economic De
velopment
133 State
Gas Tax Speci
al Revenue Publ
ic Works
134 State
Lands Speci
al Revenue Publ
ic Works
137 Neigh
borhood Parks Capi
tal Project Publ
ic Works
138 Hidd
enbrooke Community
Services
District
Speci
al Revenue Publ
ic Works
143 Hazmat
Revolving Speci
al Revenue Publ
ic Works
147 Neigh
borhood Law Program
Nuisan
ce & Abatement
Speci
al Revenue Cit
y Att
orney
161 Landscap
e Maintenance Districts
(LMD)
Speci
al Revenue Publ
ic Works
162 LMD South
Vallejo Business Park Speci
al Revenue Publ
ic Works
163 LMD Sandpi
per Point Speci
al Revenue Publ
ic Works
164 LMD Summ
it II Speci
al Revenue Publ
ic Works
165 LMD Town &
Country Speci
al Revenue Publ
ic Works
166 LMD Costa
Del Rio (Seaview) Speci
al Revenue Publ
ic Works
167 LMD Mon
ica Place Speci
al Revenue Publ
ic Works
168 LMD Gr
eenmont / Seaport Speci
al Revenue Publ
ic Works
169 LMD Ridgecres
t Speci
al Revenue Publ
ic Works
170 LMD Carr
iage Oaks Speci
al Revenue Publ
ic Works
171 LMD Cima
rron Hills / Madiga
n Speci
al Revenue Publ
ic Works
172 LMD Fleming Hi
ll / Springtree Speci
al Revenue Publ
ic Works
173 LMD Somm
erset I & II Speci
al Revenue Publ
ic Works
174 LMD Wood
ridge Speci
al Revenue Publ
ic Works
175 LMD Coll
ege Hills Speci
al Revenue Publ
ic Works
176 LMD Somm
erset III Speci
al Revenue Publ
ic Works
177 LMD Bordo
ni Ranch Speci
al Revenue Publ
ic Works
178 LMD Nort
heast Quadrant Speci
al Revenue Publ
ic Works
180 LMD Gar
the Ranch Speci
al Revenue Publ
ic Works
181 LMD Hunter
Ranch I & II Speci
al Revenue Publ
ic Works
Proposed CIP Book FY 2025-26 through 2029-30

Page 189 of 205 ends
Page 688 of 994 ends

182 LMD G
len Cove I & II / C
ountry
Pl
ace
Spe
cial Revenue Pub
lic Works
183 LMD Hunte
r Ran
ch III Spe
cial Revenue Pub
lic Works
184 LMD Town &
Country II Spe
cial Revenue Pub
lic Works
185 LMD G
len Cove III Spe
cial Revenue Pub
lic Works
186 LMD M
arine World Spe
cial Revenue Pub
lic Works
187 LMS M
arin View Spe
cial Revenue Pub
lic Works
188 LMD G
arthe Ranch Estate Spe
cial Revenue Pub
lic Works
191 Navi
gation Center Spe
cial Revenue Ci
ty Manager and
Hou
sing and Community
Deve
lopment
201 Cap
ital Outlay Cap
ital Project Pub
lic Works
203 Transpor
tation Impact Mitigation

Fee (
TIMF)
Cap
ital Project Pub
lic Works
204 Br
idge Construction Cap
ital Project Pub
lic Works
205 Fir
e Station #7 Cap
ital Project Fina
nce
208 Nort
hgate Fee & Benefit District Cap
ital Project Pub
lic Works
211 Hi
ddenbrooke Overpass Cap
ital Project Pub
lic Works
219 Gas Ta
x - Hi
ghway Users Tax
Accou
nt (HUTA) [al
so known as
Traff
ic Congestion Relief in
Bud
get Book]
Cap
ital Project Pub
lic Works
221 Cap
ital Grants and Contri
butions Cap
ital Project Pub
lic Works
222 Val
lejo Station Parking Structure Cap
ital Project Pub
lic Works
223 Long
Term Maintenance Cap
ital Project Pub
lic Works
224 Col
umbus Parkway Improvements Cap
ital Project Pub
lic Works
226 Roa
d Maintenance Rehabilitation
Act
(RMRA) / Senate Bi
ll 1 (SB1)
Cap
ital Project Pub
lic Works
227 Wate
rfront History Park Cap
ital Project Pub
lic Works
404 Ci
ty Water Funds Enter
prise Wate
r
410 Travis
Water Funds Enter
prise Wate
r
411 Lake W
ater Funds Enter
prise Wate
r
415 Marin
a Enter
prise Pub
lic Works
431 Val
lejo Station Parking Enter
prise Pub
lic Works

Proposed CIP Book FY 2025-26 through 2029-30

Page 190 of 205 ends
Page 689 of 994 ends

Appe
ndix – Descriptio
n of Funds
Fund
001 / 002 / 003 / 004
/ 005: General Fund accounts for all general revenues of the City not speci
fically levied or collected for othe
r City funds including Measure B/V & P
tr
ansaction tax and the related expen
ditures.

Fund
101: Community Developm
ent Block Grant (CDBG) Fund accounts for monies received and expen
ded by the City as a partici
pant in the Federal Community
Deve
lopment Block Grant Pr
ogram.

Fund
106: Mare Island Conversion Fund i
s used to account for monies received from Federal
grants
which are used for activi
ties relating to the conversion of the Mare Island
Nava
l Shipyard to civilian use.

Fund
107: Mare Island Base Reuse Fund
accounts for monies from tenants placed on the
for
mer Mare Island Naval Shipya
rd during the conversion process. It also
accoun
ts for operating costs to sup
port ongoing development programs on the
isl
and.

Fund
112: Mare Island CFD Fund
accounts for monies received from general taxes and from propert
y owner assessments for maint
enance and repair of infrastructure and
faci
lities on the former Mare Isl
and Naval Shipyard.

Fund
133: State Gas Tax Fund
accounts for monies received from the state gas tax allocation and expen
ded on construction, improvement,
and maintenance of public streets
and r
elated infrastructure.

Fund
134: State Lands Fund accounts f
or lease rentals generated from City-owne
d waterfront
propert
y subject to State Lands Comm
ission restrictions.

Fund
137: Neighborhood Park Deve
lopment Fund accounts for park development impact fee
reve
nue and for contributions t
o the Greater Vallejo Recreation District (GVRD)
for
park improvements.

Fund
138: Hiddenbrooke Community
Services District Fund accounts for monies collected as the
result of special taxed whi
ch are used to fund a variety of municipal services
provide
d to the residents of the H
iddenbrooke development.

Fund
143: Hazmat Revolving Fund
accounts for monies received and expended for hazardous mate
rial removal.

Fund
147: Neighborhood Law Pr
ogram (NLP) Nuisance & Abatement Fund accounts for monies rece
ived and expended to address nuisance
and blight conditions throughout the
Ci
ty.

Fund
162: LMD South Vallejo Busine
ss Park Landscape Maintenance District Fund accounts for speci
al assessments on property withi
n district boundaries for the restricted
pur
pose of providing landscape ser
vices within the specified districts.

Proposed CIP Book FY 2025-26 through 2029-30

Page 191 of 205 ends
Page 690 of 994 ends

Fu
nd 163: LMD Sandpiper Point
Fund accounts for special assessments on property within di
strict boundaries for t
he r
estricted purpose of provi
ding landscape services
w
ithin the specified district
s.

Fu
nd 164: LMD Summit II Fu
nd accounts for special assessments on property within district bo
undaries for the restric
ted purpose of providing landscape services within the
spe
cified districts.

Fu
nd 165: LMD Town & Country Fund
accounts for special assessments on property within
di
strict boundaries for t
he restricted purpose of providing landscape services
w
ithin the specified district
s.

Fu
nd 166: LMD Costa Del Rio (S
eaview) Fund accounts for special assessments on property w
ithin district boundaries f
or the restricted purpose of providing landscape
service
s within the specified dist
ricts.

Fu
nd 167: LMD Monica Place Fu
nd accounts for special assessments on property within district bo
undaries for the restric
ted purpose of providing landscape services within the
spe
cified districts.

Fu
nd 168: LMD Greenmont /
Seaport Fund accounts for special assessments on property within di
strict boundaries for t
he restricted purpose of providing landscape services
w
ithin the specified district
s.

Fu
nd 169: LMD Ridgecrest Fund accoun
ts for special assessments on property within district
bo
undaries for the restric
ted purpose of providing landscape services within the
spe
cified districts.

Fu
nd 170: LMD Carriage Oaks Fu
nd accounts for special assessments on property within
di
strict boundaries for t
he restricted purpose of providing landscape services
w
ithin the specified district
s.

Fu
nd 171: LMD Cimarron Hills
/ Madigan Fund accounts for special assessments on property w
ithin district boundaries f
or the restricted purpose of providing landscape
service
s within the specified dist
ricts.

Fu
nd 172: LMD Fleming Hill /
Springtree Fund accounts for special assessments on property w
ithin district boundaries f
or the restricted purpose of providing landscape
service
s within the specified dist
ricts.

Fu
nd 173: LMD Sommerset I & I
I Fund accounts for special assessments on property within di
strict boundaries for t
he restricted purpose of providing landscape services
w
ithin the specified district
s.

Fu
nd 174: LMD Woodridge Fund accounts
for special assessments on property within district
bo
undaries for the restric
ted purpose of providing landscape services within the
spe
cified districts.

Fu
nd 175: LMD College Hills Fund
accounts for special assessments on property within district bo
undaries for the restric
ted purpose of providing landscape services within the
spe
cified districts.

Proposed CIP Book FY 2025-26 through 2029-30

Page 192 of 205 ends
Page 691 of 994 ends

Fund
176: LMD Sommerset III Fund
accounts for special assessments on property within district boun
daries for the restrict
ed purpose of providing landscape services within the
speci
fied districts.

Fund
177: LMD Bordoni Ranch Fund accounts
for special assessments on property within
dist
rict boundaries for th
e restricted purpose of providing landscape services
wi
thin the specified districts.

Fund
178: LMD Northeast Quadrant
Fund accounts for special assessments on property within dist
rict boundaries for th
e restricted purpose of providing landscape services
wi
thin the specified.

Fund
180: LMD Garthe Ranch Fund acco
unts for special assessments on property within district boun
daries for the restrict
ed purpose of providing landscape services within the
speci
fied districts.

Fund
181: LMD Hunter Ranch I &
II Fund accounts for special assessments on property within dist
rict boundaries for th
e restricted purpose of providing landscape services
wi
thin the specified districts.

Fund
182: LMD Glen Cove I &
II / Country Place Fund accounts for special assessments on propert
y within district boundar
ies for the restricted purpose of providing
lan
dscape services within the specifi
ed districts.

Fund
183: Hunter Ranch III
Fund accounts for special assessments on property within district boun
daries for the restrict
ed purpose of providing landscape services within the
speci
fied districts.

Fund
184: LMD Town & Country II
Fund accounts for special assessments on property within dist
rict boundaries for th
e restricted purpose of providing landscape services
wi
thin the specified districts.

Fund
185: LMD Glen Cove III
Fund accounts for special assessments on property within district boun
daries for the restrict
ed purpose of providing landscape services within the
speci
fied districts.

Fund
186: LMD Marine World Fund acco
unts for special assessments on property within district boun
daries for the restrict
ed purpose of providing landscape services within the
speci
fied districts.

Fund
187: LMD Marin View Fund acco
unts for special assessments on property within district boun
daries for the restrict
ed purpose of providing landscape services within the
speci
fied districts.

Fund
188: LMD Garthe Ranch Estat
e Fund accounts for special assessments on property within dist
rict boundaries for th
e restricted purpose of providing landscape services
wi
thin the specified districts.

Fund
191: Navigation Center Fund
appropriates various donations to support the operation of the
Vallejo Homeless Navigation Cen
ter
Proposed CIP Book FY 2025-26 through 2029-30

Page 193 of 205 ends
Page 692 of 994 ends

Fu
nd 201: Capital Outlay Fund
accounts for the expenditure of General Fund and grant funded cap
ital projects, including acqui
sitions and improvements of public property,
pu
blic works projects, facil
ities, equipment, and systems.

Fu
nd 203: Transportation Impact
Mitigation Fee (TIMF) Fund accounts for monies received from t
he Transportation Impact
fee imposed on commercial and residential
de
velopment and expended on transporta
tion improvements necessitated by
such
development.

Fu
nd 204: Bridge Construction Fund a
ccounts for monies received from the Bridge Construction D
evelopment Tax Ordinance.

Fu
nd 205: Fire Station #7 Fund accounts
for development fees that support deb service
pa
yments on Columbus Fire Station
#7.

Fu
nd 208: Northgate Fee & Benefit
District #94-1
Fund accounts for monies r
eceived from the
de
velopment of the Northgate D
istrict #94-1
and expended for public
i
mprovement within that develop
ment area.

Fu
nd 211: Hiddenbrooke Overpass
Fund accounts for monies received from the Hiddenbrooke O
verpass fee imposed in commerci
al and residential development within the
H
iddenbrooke development area. These
funds will be used to renovate the
exi
sting Hiddenbrooke o
verpass over I-80
East and West bound.

Fu
nd 219: Gas Tax - H
ighway Users Tax Account (HU
TA) [
also known as Traffic Congestion
R
elief in Budget Book] - Fu
nd accounts for street maintenan
ce and capital
exp
enditures to be paid from
State proposition 42 allocations.

Fu
nd 221: Capital Grant &
Contributions Fund accounts for capital project expenditures to be r
eimbursed by granting agencies,
developers, and other third parties.

Fu
nd 222: Vallejo Station Parking
Structure (VSPS) Capital Projects Fund accounts for grants r
eceived to support construction
of a new Transit Center and related parking
st
ructure in downtown Vallejo.

Fu
nd 223: Long Term Maintenance Fund
accounts for revenues received from cell tower leases
f
or use on long term repair
s and maintenance expenditures.

Fu
nd 224: Columbus Parkway Improvement
Fund accounts for monies received from a
de
veloper for the Columbus Parkwa
y widening project.

Fu
nd 226: Road Maintenance Rehabili
tation Act (RMRA) / Senate Bill 1 (SB1) Fund accounts
f
or street maintenance and cap
ital projects to be paid from RMRA / SB1
al
location.

Fu
nd 227: Waterfront History
Park Fund accounts for monies for the planning, development, an
d construction of the Waterfr
ont History Park Project and other activities that
f
urther the goals of the
project.

Fu
nd 404: City Water Enterp
rise Systems Fund accounts for the projection and distribution of w
ater to residents and businesses located
within the City.

Proposed CIP Book FY 2025-26 through 2029-30

Page 194 of 205 ends
Page 693 of 994 ends

Fu
nd 410: Travis Water Enterprise S
ystems Fund accounts for the projection and distribution of w
ater to residents and businesses located
within the Travis Water System.

Fu
nd 411: Lake Water Enterprise Sys
tems Fund accounts for the projection and distribution of w
ater to residents and businesses located
within the Lakes Water System.

Fu
nd 415: Marina Enterpri
se Fund accounts for monies paid by Marina berthers and used for t
he operations, improvement
, and management of the City Marina operations.

Fu
nd 431: Vallejo Station P
arking Enterprise Fund accounts for the m
onies received from paid
pa
rking lots and is for the opera
tions, maintenance, and management of the
V
allejo Station Parking Structure.

Proposed CIP Book FY 2025-26 through 2029-30

Page 195 of 205 ends
Page 694 of 994 ends

Appe
ndix – Acron
yms / Abbreviations
Acron
ym /
Abb
reviation
Ter
m
ABAG Asso
ciation of Bay Area Governments
ARPA Am
erican Rescue Plan Act
ATP Active
Transportation Program
AS
TM Am
erican Society for Testing & Mat
erials
BA
AQMD Ba
y Area Air Quality Managem
ent District
BCD
C Ba
y Conservation & Development Co
mmission
BM
P Be
st Management Practices
CAD Comp
uter aided design
CADD Comp
uter aided design & draft
ing
CDB
G Commu
nity Development Block Grant
CDB
W California
Division of Boating & Waterwa
ys
CDFW California
Department of Fish & Wildlife
CEQA California
En
vironmental Quality Act
CFD Commu
nity Facilities District
CIMM
P Capita
l Improvement & Major Maintenanc
e Program
CIP Capita
l Improvement Program
COV City
of Vallejo
CTC California
Transportation Commission
DEIR Dra
ft Environmental Impact Rep
ort
EIR En
vironmental Impact Report
EIS En
vironmental Impact Stateme
nt
ERP En
terprise Resource Planning
FEMA Fed
eral Emergency Managemen
t Agency
FTE Full
Time Equivalent
FY Fisca
l Year
GIS Grap
hical Information System
GVRD Grea
ter Vallejo Recrea
tion District
HBP Hig
hway Bridge Program
HSIP Hig
hway Safety Improvement Program
HUD Housing
& Urban Development
HUTA Hig
hway User Tax Allocations
Proposed CIP Book FY 2025-26 through 2029-30

Page 196 of 205 ends
Page 695 of 994 ends

HVAC Heatin
g, ventilating, and air condition
HWY Hig
hway
IRT Inn
ovative Readiness Tra
ining
IT Info
rmation Technology
JPA Joint
Powers Authority
LL
MD Ligh
ting & Landscape Mainte
nance District
LM
D La
ndscape Maintenance District
LOS Le
vel of Service
MTC Me
tropolitan Transportation Co
mmission
MUT
CD Ma
nual on Uniform Traffic Contro
l Devices for Streets and Highways
NEPA Nation
al Environmental Policy Act
NLP Neigh
borhood Law Program
NPDES Nation
al Pollutant Discharge
Elimination System
OBA
G One
Bay Area Grant
PC Plan
ning Commission (City)
PCI Pa
vement Condition Ind
ex
PDA Pri
ority Development Area
RFP Requ
est for Proposals
RFQ Requ
est for Qualifications
SCADA Su
pervisory Control and Data Acqu
isition
SR2S Sa
fe Routes to School
STA So
lano County Transportation Au
thority
STIP Sta
te Transportation Im
provement Program
TDA Tra
nsportation Development A
ct
USFWS United
States Federal Fish & Wildlif
e
USPS United
States Postal Service
VFD Va
llejo Fire Department
VFW
D Va
llejo Flood & Wastewater District
VM
C Va
llejo Municipal Code
VM
T Ve
hicle Mil
es Traveled
WTP Wa
ter Treatment Plant
Proposed CIP Book FY 2025-26 through 2029-30

Page 197 of 205 ends
Page 696 of 994 ends

Append
ix – Glo
ssary of Terms

Associatio
n of Bay Area Governments
is part regional planning agency and part local
governmen
t service provider. Provides
planning and cost saving services to local
governmen
ts.

Adopted
Budget: Adopted level of
expenditures / revenues / Full-Time Eq
uivalents as outlined in
the
adopted budget document
.

Actua
l: Actual level of
revenues or expenditures in the fiscal year noted.

Appr
opriations: An authorization by
the City Council to make expenditures and to incur
obli
gations for a specific pur
pose. All expenditures must be appropriated by City
Counci
l prior to being able t
o expend the funds.

Appr
oved Budget: The approved budget
is the annual City budget approved by the City Council
for
expenditures on or before Jun
e 30.

American Re
scue Plan Act was the $1.
9 trillion-doll
ar law signed on March 11,
2021 by
Presi
dent Joe Biden to provide con
tinued relief from the impact of the COVID-19
Pande
mic.

Art
erial Roadway Segment: Th
e roadway which carries the major portion of trips entering and leavi
ng the City as well a
s the travel to the central business districts and outlying reside
ntial areas.

Assessment
: Revenue collected for C
ity services which benefit properties in specific areas or distr
ict.

Assets:

Property owned by the C
ity for which a monetary value has been established.

Acti
ve Transportation Program is a
Federal Program for the purpose of encouraging increased use of
active modes of transpo
rtation, such as biking and walki
ng.

America
n Society for Testing and M
aterials creates standards used around the globe,
standa
rdizing work in engineering,
manufacturing and many other fields.

Avail
able Balance: The unreserved, undesignated
portion of fund balance available for future
operati
ons. For Enterprise funds,
fund balance represents the current working
capit
al portion of the fun
d’s equity, which excludes capital assets, long-ter
m debt,
and othe
r non-curren
t items.

Bay Area A
ir Quality Managemen
t District regulates stationary sources of air pollution in the nine
counties that surround San
Francisco Bay. The Board oversees policies and
adopt
s regulations for the control
of air pollution in the district.

Bay Conse
rvation & Development
Commission protects and enhances the San Francisco Bay
and encour
ages the Bay’s responsible and pr
oductive use for this and future
gener
ations.

Proposed CIP Book FY 2025-26 through 2029-30

Page 198 of 205 ends
Page 697 of 994 ends

Best Management Practices is a met
hod that has been determined to be the most effective and practical means of preventing or reducing
non-point source pollution to help
achieve water quality goals.

Bond: A certificate of debt issue
d by an entity, guaranteeing payment of the original investment plus interest, by a specified future
date. Bonds are typically used for long-term
debt to pay for specific capit
al expenditures.

Budget: An annual plan of financi
al operation embodying an estimate of recommended
expenditures and the estimated mea
ns of financing them. The approved budget
is authorized by City Council actio
n and thus specifies the legal spending limits of
the fiscal year.

Budget Modification: A chang
e of expenditure levels and corresponding resources over and above the base budget, which is needed
to accomplish an existing service level
or unanticipated service. Al
l budget modifications are approved by the City
Council.

Computer aided design or computer ai
ded design and drafting (CADD) is the use of computer
technology for design and design do
cumentation.

Capital Improvement: A
permanent addition to the City’s assets, including the design, construction or purchase of
land, buildings or facilities, or major renovations. This includes installation or repair of
new or existing traffic signals, roads, sewer lines
and parks.

Capital Improvement Pro
ject: One project within the Capital Improvement Program (CIP). To qualify as a capital improvement pro
ject, the cost of the project must exceed
$10,000. The City will actively pursue gran
t and other outside funding sources for
all capital improvement proj
ects.

Capital Improvement Pro
gram (CIP): An on-going five-year plan of single and mult iple year
capital expenditures which is updated an
nually. The CIP identifies capital
projects and equipment purchases, pr
ovides a planning schedule and identifies
options for financing the plan.

Community Development Block
Grant is a flexible program that provides communities with resources to address a wide range o
f unique community development needs.

Beginning in 1974, the CDBG
program is one of the longest continuously run
programs at HUD. The CDBG program provides annua
l grants on a formula
basis to 1209 general units
of local government and States.

California Division of Boating & Water
ways is responsible for planning, developing, and
improving facilities on state-owned and state-managed properties, including those on State Parks and State Wate
r Project properties. It also provides funding
so that local agencies can renew deteriorated faci
lities or develop new public
access
California Department of Fish & Wil
dlife manages California’s diverse fish, wildlife, and plant resources, and the habitats upon w
hich they depend, for their ecological values
and for their use and enjoyment by
the public.

Proposed CIP Book FY 2025-26 through 2029-30

Page 199 of 205 ends
Page 698 of 994 ends

California Environmental Qualit
y Act discloses to the public the significant environmental effects of a proposed discretionary project
, through the preparation of an initial study,
negative declaration, mitigated
negative declaration, or environmental impact
report.

Community Facilities Distri
ct is formed by a local governmental agency pursuant to the Mello- Roos Community Facilities Act
of 1982 in order to finance certain capital facilities
and services. Once formed, a
CFD has the authority to levy a special tax on real
property within its boundaries.

Closed, Completed, or Inactive CI
P Projects: Annually, completed or inactive projects will be closed, except for projects t
hat have existing litigation or payment disputes. An
inactive project is defined as on
e where transaction activity is less than $1,000
over the prior three years. Th
e City Manager, or his or her designee, is
authorized to close projects
and to process the necessary documentation to
close inactive projects.

Contingency: A budgetary reser
ve set aside for emergencies for unforeseen expenditures.

Collector Roadway Segment: The r
oadway which connects the arterial streets to the residential streets and the commercial
and industrial areas.

CTC: California Transportation Comm
ission is responsible for programming and allocating funds for the construction of hi
ghway, passenger, rail, transit and active transportation improvements throughout Cal
ifornia.

Debt Service: Payment of i
nterest and principal on an obligation resulting from the issuance of bonds and notes.

Deferred Maintenance: Repairs which shoul
d have been completed but were deferred to a later
date due to funding deficien
cies. This type of repairs tend to lead to more costly
repairs due to the roadway det
erioration becoming severe by the time funding is
available.

Department: The basic unit
of service responsibility, encompassing a broad mandate of related activities.

Division: A sub-unit of a department, w
hich encompasses more specific functions of that
department and may consist o
f several activities.

EIR: Environmental Impact
Report (CEQA related document)
EIS: Environmental Impact
Statement (NEPA related document)
Encumbrance: Financial commitments
related to unperformed contracts for goods or services
for which part of an appropri
ation is reserved. They cease to be encumbrances
when the obligations are pai
d or otherwise terminated.

Enterprise Fund: A governmental faci
lity or service which operates like a private business and is intended to be self-supporting, i.e., revenues w
ill cover all expenses of the
operations including capital cost
s. These funds operate on a full accrual basis
recognizing revenues or expenses wh
en the event occurs.

Proposed CIP Book FY 2025-26 through 2029-30

Page 200 of 205 ends
Page 699 of 994 ends

E
nterprise Resource Planning is a t
ype of software that organizations use to manage day-t
oday
bu
siness activities such as accounting, p
rocurement, project management, risk
m
anagement and compliance.

E
xpenditure: The actual spending
of funds authorized by an appropriation.

Fa
ir Pavement Condition C
ategory: Pavement in “fair” condition show some form of distress cau
sed by traffic load related ac
tivity or environmental distress that requires more
t
han a life extending treatm
ent
Fi
nal Budget: The City
Council approved revenue and expenditure budget as appropriated.

Fu
ll Time Equivalent are the
ration units or equivalent employees working full-t
ime. In other
w
ords, one FTE is equivalent to
one employee working full-t
ime.

Fu
nd: A separate set of accounts
used to record receipt and use of money restricted for specific pu
rposes. The City’s finances are di
stributed among 101 separate funds required
by t
he City, state or feder
al government, or by proper accounting practices. Fund

t
ypes include:
a. G
eneral Fund received all unr
estricted money which pays for the
m
ajority of departmental
spending for traditional City services.
b. S
pecial Revenue funds are revenues ea
rmarked for specific
pu
rposes.
c. D
ebt Services funds are used to
repay the principal and interest on
i
ndebtedness.
d. C
apital Project funds are
used to account for construction of major
pu
blic facilities.
e. E
nterprise funds are self-sup
porting activities financed by
users and
op
erated similar to private businesses.
f. I
nternal Services funds are ent
erprises that sell services internally to
other
City entities rather tha
n to the general public.
g. Trust
and Agency funds are used to accoun
t for assets held by the
C
ity as a trustee or agent
for employees, private organizations or
other
governments. (There are not
included in the City budget).

Fu
nds Available: Actual cash avai
lable for discretionary purposes, projects or appropriations Fi
scal Year is a twelve-m
onth period of time to which t
he budget applies. For the City of Vallejo,
i
t is July 1 through June 30.

G
eneral Fund: The City’s prin
cipal operating account, which is supported by taxes and fees, and ge
nerally has no restricti
ons on their use. Expenditures may be described as
di
scretionary and non-di
scretionary.
• D
iscretionary – t
hat portion of the Gene
ral Fund for which there are no
r
estrictions on the use of t
he fees or taxes collected;
Proposed CIP Book FY 2025-26 through 2029-30

Page 201 of 205 ends
Page 700 of 994 ends

• Non-discretionary – expenditure of revenues which are collected by
users of a program to offset
the cost of the program. State law
requires that fees charged cannot exce
ed the cost of the service.

Good Pavement Condition Category:

Pavement in “good” condition have little to no distress found on them. There might
be some minor surface weathering or light cracking,
but can generally be maintained wi
th cost-effective preventative maintenance
treatments such as slurry seals and crack sea
ls.

Governmental Fund: Funds, such as
the General Fund, which recognizes events when they
affect current financial re
sources. Reductions are called expenditures.

Grants: A transfer or
awarding of monies from either the federal or state government to the City in order to finance a specific
activity or program. The City receiving the grant
funds is not required to rep
ay the awarding entity the amount in the future. The
City Manager is authori
zed to submit grant applications for activities within the jurisdiction of the City.

The City Manager is authorized to accept grants, to
expend grant funds if the fun
ds have been appropriated, and to implement the
actions required by any grant for projects
and programs within the City’s
jurisdiction.

Graphical Information Syst
em is a system designed to capture, store, manipulate, analyze, manage, and present spatial or ge
ographic data.

Greater Vallejo Recreation D
istrict offers a broad array of classes for children, adults and seniors. Classes range from swim
ming to soccer, wellness to science, basketball
to ballet and much more.

Heating, ventilation, and air
conditioning (HVAC) is the technology of indoor and vehicular environmental comfort. R
efrigeration is sometimes added to the field's
abbreviation as HVAC&R or HVACR
, or ventilating is dropped, as in HACR (as in
the designation of HACR-rated circuit breakers).

Highway Bridge Program is a safe
ty program that provides federal-aid to local agencies to replace and rehabilitate defi
cient locally owned public highway bridges or
complete preventive maintenance on bridges tha
t are not deficient.

Highway Safety Improvement Progr
am is a core Federal-aid program with the purpose
to
achieve a significant reduction in tr
affic fatalities and serious injuring on all public
roads, including non-State-owned roads and roads on tri bal lands. The HSIP
requires a data-driven, strategic approach to
improving highway safety on all
public roads with a focus on pe
rformance.

HUD: The United States Depart
ment of Housing and Urban Development (Commonly known as HUD) is a Cabinet departmen
t in the Executive branch of the United States
federal government.

Highway User Tax Account. The s
tate of California imposes per-gallon excise taxes on gasoline

and diesel fuel, sales taxes on gasoli
ne and diesel fuel and registration taxes on
motor vehicles with allocation
s dedicated to transportation purposes.

Proposed CIP Book FY 2025-26 through 2029-30

Page 202 of 205 ends
Page 701 of 994 ends

Highway. A highway is any public road
or other public way on land. It is used for major roads, but also includes other public r
oads and public tracks: it is not an equivalent term
to controlled-access highway, or a translation f
or autobahn, auto route, etc.

Innovative Readiness Training i
s a collaborative program that leverages military contributions and community resources to m
ultiply value and cost savings for participants.

Communities typically provide
materials and basic services (e.g. facilities), while
military units contribute personne
l and training resources. IRT missions produce
mission ready forces, civil-military partnerships, and st ronger communities.

Information Technology is t
he application of computers to store, study, retrieve, transmit, and manipulate data, or information,
often in the context of a business or other
enterprise.

Joint Powers Authority is an en
tity permitted under the laws of some U.S. states, whereby two or more public authorities (
e.g. local governments, or utility or transport districts), not necessarily located in the same
state, may jointly exercise any power
common to all of them.

Landscape Maintenance District or
Lighting & Landscape Maintenance District (LLMD) is a
financing vehicle utilized to m
ake certain improvements to particular
neighborhoods within the comm
unity. These improvements, such as parks,
playgrounds, landscapes, sidewalks, trees, etc., are pai d for by the landowners
within the LMD.

Measure B/V: This is a one
percent (1%) sales tax measure that was approved by voters on November 8, 2011 ballot to
expire in ten years on March 31, 2022. On November
8, 2016 the voters approved Measure
V which removed the 10-year sun setting
of Measure B.

Measure P: This is a 0.875
% transaction use tax, approved by voters on the November 8, 2022 ballot which resulted in a new
sales tax of 9.25% effective April 1, 2023.

Metropolitan Transportation
Commission is the transportation planning, financing and coordinating agency for the
nine-county San Francisco Bay Area.

Manual on Uniform Traff
ic Control Devices for Streets and Highways, or MUTCD defines the standards used by road managers
nationwide to install and maintain traffic
control devices on all public str
eets, highways, bikeways, and private roads open
to public travel. The MUTCD is publ
ished by the Federal Highway Administration
(FHWA) under 23 Code of Feder
al Regulations (CFR), Part 655, Sub part F.

National Environmental Policy
Act requires federal agencies to assess the environmental effects of their proposed actions prior
to making decisions.

Neighborhood Law Program is
funded by Measure B. The program puts attorneys on the streets of Vallejo to tackle blight an
d nuisance conditions.

One Bay Area Grant program
grants local communities the flexibility to invest in transportation infrastructure that supports i
nfill development by providing funds for bicycle and
pedestrian improvements, local
road repair and planning activities, while also
Proposed CIP Book FY 2025-26 through 2029-30

Page 203 of 205 ends
Page 702 of 994 ends

provi
ding funds for Safe
Routes to School programs and for Priority Conservation A
reas.

O
perating Budget: Ann
ual appropriation of funds for on-go
ing program costs, i
ncluding
pe
rsonnel, operations, cap
ital outlay and debt service.

O
rdinance: A formal leg
islative enactment by the City Council. It has the full force and effect of l
aw within the City bo
undaries unless it is in conflict with any higher form of law such
as a State statue or
constitutional provision. An ordinance has a high
er
l
egal standing than a res
olution.

P
lanning Commission for t
he City decides if each CIP project aligns with the General Plan.

P
avement Condition Index is a
numerical index between 0 and 100 which is used to indicate the ge
neral condition of a
pavement. It is widely used in transportation and civil en
gineering. It is a statist
ical measure and requires manual survey of the
pa
vement.

PCI surveying processes and cal
culation methods have been
st
andardized by ASTM for both
roads and airport pavements.

P
ersonnel Costs: The cost of
a City department, including wage / salary, direct and indirect be
nefits such as health i
nsurance, social security costs, retirement contribution, w
orkers’ compensation, unemploymen
t insurance, etc.

P
reventative Maintenance: Repair
s applied to pavement while in the “good” condition to extend t
he life of the pavement
at relatively low costs and prevent the pavement from
con
tinued deterioration.

Preventative maintenance treatments include slurry
sea
ls, c
rack sealing and deep pat
ching.

P
oor Pavement Condition
Category: Pavement in “poor” condition indicates a street is near the en
d of its service life and exhi
bits potholes, extensive alligator cracking, and
pa
vement depressions.

R
esidential Roadway Segment: Th
e roadway which travels through residential areas.

R
esolution: A special order of
the City Council, which requires less legal formality than an ordi
nance in terms of publi
c notice and the number of public readings prior to
ap
proval. A resolution has
lower legal standing than an ordinance. The adopted
C
ity bu
dget is approved by resolut
ion and requires a majority vote of the Council
m
embers present at budge
t adoption time.

R
esources: Total amounts availabl
e for appropriation during the fiscal year, including revenues, f
und transfers and beginn
ing fund balances.

R
oad Diet Project: A ro
ad diet will reduce the number of travel lanes to one in each direction an
d include a center turn lan
e. The addition of bike lanes can be included.

E
xisting striping and pavement
markings will be removed. New striping and
pa
vement markings will be instal
led. Some traffic signs may also need to be
i
nstalled.

S
CADA: Supervisory Contr
ol and Data Acquisition S
upervisory control and data acqui
sition is a
con
trol system architecture
that uses computers, networked data
comm
unications and graphical
user interfaces for high-l
evel process supervisory
Proposed CIP Book FY 2025-26 through 2029-30

Page 204 of 205 ends
Page 703 of 994 ends

management but uses other
peripheral devices such as programmable logic
controllers and discrete proport
ional-integral-derivative (PID) control
lers to
interface to the process
plant or machinery. The operator interfaces which enable monitoring and the issuing of process commands, such a
s controller set point
changes, are handled throu
gh the SCADA supervisory computer system.

However, the real-time control logic o
r controller calculations are performed by
networked modules which connect
to the field sensors and actuators.

Safe Routes to School is an
approach that promotes walking and bicycling to school through infrastructure improvements, en
forcement, tools, safety education, and incentives
to encourage walking and bicycling
to school.

Solano County Transportation Autho
rity was created in 1990 through a joint powers agreement between the cities of B
enicia, Dixon, Fairfield, Rio Vista, Suisun City, Vacaville, Vallejo and Solano County to serve
as the congestion management agency for
Solano. As the congestion of STA
is responsible for countywide transportation
planning, programming tran
sportation funds, managing and providing
transportation program
s and services, delivering transportation projects, and setting transportation prioritie
s. Management Agency (CMA) f
or the Solano area,
the STA Partners wi
th various transportation and planning agencies, such as the Metropolitan Transport
ation Commission (MTC) and Caltrans District 4. The STA uses an open and inclusive public i
nvolvement process through various
committees made up of loca
l elected officials, public works directors, transit
operators, and interested cit
izens.

Transportation Development Act.

The Mills-Alquist-Deddeh Act (SB 325)
was enacted by the
California Legislature to improve exi
sting public transportation services and
encourage regional trans
portation coordination. Known as the Transportation
Development Act (TDA) of 1971, thi
s law provides funding to be allocated to
transit and non-transit related purposes t
hat comply with regional transportation
plans.

United States Federal Fi
sh & Wildlife is the premier government agency dedicated to the conservation, protection,
and enhancement of fish, wildlife and plants, and their habitats.

United States Postal S
ervice (also known as the Post Office, U.S. Mail, or Postal Service) is an independent agency of the
United States federal government responsible for
providing postal service in the U
nited States. It is one of the few government
agencies explicitly authorized by
the United States Constitution.

Very Poor Pavement Cond
ition Category: Pavement in “very poor” condition indicates a street that has failed and at
the end of its service life with major distresses.

WTP: Water Treatment
Plant is any process that makes water more acceptable for a specific end-use. The end use may be drinking
, industrial water supply, irrigation, river
flow maintenance, water recreat
ion or many other uses, including being safely
returned to the environment.

Water treatment removes contaminants and
undesirable components or reduces their concentr
ation so that the water
becomes fit for its de
sired end-use.

Proposed CIP Book FY 2025-26 through 2029-30

Page 205 of 205 ends
Page 704 of 994 ends

ACTION ITEM 9.B.

DATE: July 22, 2025
TO: Mayor and Members of the City Council
FROM: Oscar Alcantar, Interim Public Works Director
SUBJECT: ADOPT A RESOLUTION: 1) FINDING THE CAPE SEAL 2025 PROJECT (MP2025) (RESURFACING RESIDENTIAL STREETS WITH CAPE SEAL) CATEGORICALLY

EXEMPT FROM THE PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO CEQA GUIDELINES SECTION 15301(C); 2) APPROVING THE PROJECT PLANS AND SPECIFICATIONS FOR THE PROJECT; AND 3) AWARDING A CONSTRUCTION CONTRACT TO GHILOTTI BROS., INC., OF SAN RAFAEL, CALIFORNIA IN THE AMOUNT OF $3,689,824.98 AND REJECTING ALL

OTHER BIDS, AND AUTHORIZING THE CITY MANAGER TO EXECUTE SAME

RECOMMENDATION
Adopt a Resolution: 1) Finding the Cape Seal 2025 Project (MP2025) (resurfacing residential streets with Cape Seal) categorically exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301(c); 2) Approving the plans and specifications for the Project; and 3) Awarding a construction contract to Ghilotti Bros., Inc., of San Rafael of California in the amount of $3, 689,824.98, rejecting all other bids, and authorizing the City Manager to execute the contract.

REASONS FOR RECOMMENDATION
The project is part of the City's efforts to enhance and improve Vallejo's roadway conditions and was funded with Measure P funds.

BACKGROUND AND DISCUSSION
Voters approved the Vallejo Safe Streets and Essential Services Measure (Measure P) in the November 2022 Municipal Elections. Measure P is estimated to generate $18 million annually to help maintain critical City services and address community priorities as identified in previous community surveys. On December 20, 2022, the City Council adopted Resolution 22-222, which directed staff to prioritize work in nine categories, including repairing deteriorating neighborhood streets and sidewalks.

On February 20, 2024, the City Council allocated $5 million of Measure P funding to jump-start the City's investment in pavement improvements. Of the $5 million allocated, $1 million was for the planning and engineering of capital improvement program (CIP) projects that would be bid each winter to be constructed each summer / fall on an annual basis. Public Works enlisted the support of the highly qualified on-call consultant engineering firm, Nichols Consulting Engineers (NCE), to support staff in developing a 10-year plan for annual investments in the roadway network, and also to engineer the CIP projects each year. In the summer / fall of 2024, Public Works implemented a $2 million slurry seal project as the first annual effort investing in the City's roadways. Public Works also initiated planning and engineering efforts, developing the CIP pipeline for an annual program of delivering major paving projects each summer / fall for the following 10 years.

For the 2025 summer / fall paving season, Public Works returned to the Measure P Oversight Committee and City Council to request $10M to fund both a Cape Seal Project to resurface and extend the life of residential streets and a Grind and Overlay Paving Project for arterials and major collectors. The street segments

Page 705 of 994 ends

Date: July 22, 2025
Subject: ADOPT A RESOLUTION: 1) FINDING THE CAPE SEAL 2025 PROJECT (MP2025) (RESURFACING RESIDENTIAL STREETS WITH CAPE SEAL) CATEGORICALLY

EXEMPT FROM THE PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO CEQA GUIDELINES SECTION 15301(C); 2) APPROVING THE PROJECT PLANS AND SPECIFICATIONS FOR THE PROJECT; AND 3) AWARDING A CONSTRUCTION CONTRACT TO GHILOTTI BROS., INC., OF SAN RAFAEL, CALIFORNIA IN THE AMOUNT OF $3,689,824.98 AND

REJECTING ALL OTHER BIDS, AND AUTHORIZING THE CITY MANAGER TO

EXECUTE SAME

Page 2 ends

included in the project were recommended by the City's StreetSaver Database and were presented to the Measure P Oversight Committee and to City Council at the time the budget allocation request was made.

Council allocated $10 million to the City's CIP budget for the summer 2025 paving projects.

Plans, specifications, and estimates (PS&E) were prepared and completed by NCE under the direction of the Interim Public Works Director. The project was advertised for bid beginning May 20, 2025 on Planet Bids and in the Vallejo Times Herald, in accordance with Public Contract Code Section 20164. A four-week advertising period was completed. The Plans and Specifications are available for review through the hyperlinks provided in Attachment 2 - Construction Contract MP2025 - under Exhibit G.

On March 26, 2024, the City Council adopted Resolution No. 24-040 N.C., approving a Project Labor Agreement (PLA) with the Napa-Solano Building and Construction Trades Council and its affiliated local unions. The PLA applies to future City capital projects exceeding a threshold of $750,000. As the engineer’s estimate for this project exceeded that threshold, the contract included provisions to comply with this requirement.

On June 17, 2025, sealed bids were opened and publicly read by the Deputy City Clerk. The City received two (2) bids and the results of the bids for the subject project, in order from lowest to highest, are as follows:

Bid Order Contractor Total Base Bid Amount

1. Ghilotti Bros., Inc. $3,689,824.98

2. Team Ghilotti, Inc. $4,141,700.00

Staff determined that Ghilotti Bros., Inc., of San Rafael, California, is the lowest responsive and responsible bidder and recommends awarding a construction contract in the amount of $3,689,824.98. All submitted bid requirements appear to be complete and in order, meeting all bid requirements.

FISCAL IMPACT
There is no fiscal impact on the General Fund associated with this item, as it is being funded through the capital improvement program funds previously appropriated for MP2025.

SOURCES BUDGET EXPENDITURES

Fund 228: Measure P
(Project MP2025-Measure P Street Paving)
$10,000,000
Fund 228: Measure P
(Project PW9705: ADA Curb Ramps)
$500,000

Page 706 of 994 ends

Date: July 22, 2025
Subject: ADOPT A RESOLUTION: 1) FINDING THE CAPE SEAL 2025 PROJECT (MP2025) (RESURFACING RESIDENTIAL STREETS WITH CAPE SEAL) CATEGORICALLY

EXEMPT FROM THE PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO CEQA GUIDELINES SECTION 15301(C); 2) APPROVING THE PROJECT PLANS AND SPECIFICATIONS FOR THE PROJECT; AND 3) AWARDING A CONSTRUCTION CONTRACT TO GHILOTTI BROS., INC., OF SAN RAFAEL, CALIFORNIA IN THE AMOUNT OF $3,689,824.98 AND

REJECTING ALL OTHER BIDS, AND AUTHORIZING THE CITY MANAGER TO

EXECUTE SAME

Page 3 ends

Fund 226: Road Maintenance Rehabilitation
Account (RMRA)
(Project PW9705: ADA Curb Ramps)
$150,000
Fund 226: Road Maintenance Rehabilitation
Account
(Project PWC116: Striping)
$200,000
Fund 219: Gas Tax Sec 2103 / Highway Users
Tax Act (HUTA)
(Project PWC116: Striping)
$100,000

Design ($384,600)
Construction Contract ($3,689,824..98)
Construction Contingency (5%) ($184,491.25)
Construction Management & Inspection (Staff &
Consultants)
($368,982.50)

TOTALS $10,950,000 ($4,243,298.73)

This contract does not utilize the full funding allocation from each project noted above. The remaining balances will be reserved for other road repair/improvement projects to be scheduled at a later date, with actual expenditures pending City Council approval.

ENVIRONMENTAL REVIEW
The proposed project is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines section 15301(c) "Existing Facilities", which applies to the repair and maintenance of highways and streets sidewalks, gutters, and similar facilities (this includes road grading for the purpose of public safety), and other alterations such as the addition of safety enhancement facilities, including but not limited to high visibility crosswalks, advanced warning signs.

ATTACHMENTS

1. Resolution Awarding 2025 Cape Seal Project MP2025 to Ghilotti Bros for $3,689,824.98_CAO Stamp

2. Contract MP2025 Ghilotti Bros-CAPE SEAL $3,689,824.98_CAO Stamp

3. Location Map - Cape Seal 2025 Project

Page 707 of 994 ends

Date: July 22, 2025
Subject: ADOPT A RESOLUTION: 1) FINDING THE CAPE SEAL 2025 PROJECT (MP2025) (RESURFACING RESIDENTIAL STREETS WITH CAPE SEAL) CATEGORICALLY

EXEMPT FROM THE PROVISIONS OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO CEQA GUIDELINES SECTION 15301(C); 2) APPROVING THE PROJECT PLANS AND SPECIFICATIONS FOR THE PROJECT; AND 3) AWARDING A CONSTRUCTION CONTRACT TO GHILOTTI BROS., INC., OF SAN RAFAEL, CALIFORNIA IN THE AMOUNT OF $3,689,824.98 AND

REJECTING ALL OTHER BIDS, AND AUTHORIZING THE CITY MANAGER TO

EXECUTE SAME

Page 4 ends

CONTACT
Oscar Alcantar, Interim Public Works Director, (707) 648-4433 [email protected]

Page 708 of 994 ends

RESOLUTION NO. 25-______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VALLEJO: 1) FINDING THE CAPE SEAL 2025 PROJECT (MP2025) (RESURFACING RESIDENTIAL STREETS

WITH CAPE SEAL) CATEGORICALLY EXEMPT FROM THE CALIFORNIA

ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO CEQA GUIDELINES SECTION 15301(C); 2) APPROVING THE PROJECT PLANS AND SPECIFICATIONS FOR THE PROJECT; AND 3) APPROVING AND AWARDING A CONSTRUCTION CONTRACT TO GHILOTTI BROS., INC. OF SAN RAFAEL, CALIFORNIA IN THE AMOUNT OF $3,689,824.98

AND REJECTING ALL OTHER BIDS, AND AUTHORIZING THE CITY MANAGER TO

EXECUTE THE CONTRACT
WHEREAS, the Measure P-funded Cape Seal 2025 Project (MP2025) is a demonstrates Vallejo’s continued investment in improving local roadway conditions; and WHEREAS, Vallejo Public Works has on-call contracts for Engineering Services awarded by Council and determined that Nichols Consulting Engineers (NCE) was the highest qualified on- call firm to support Vallejo’s Pavement Management Program efforts; and WHEREAS, NCE drafted a 10-year plan of roadway reinvestment to improve Vallejo’s road conditions and Public Works staff prioritized the 2025 roadway segment selection and presented the roadway segments to council when Measure P project funding was requested; and
WHEREAS, Council allocated $10M of Measure P funding into the Capital Improvement Program for the purpose of delivering pavement resurfacing and renewal projects in the summer/fall of 2025; and
WHEREAS, project plans, specifications, and estimates (PS&E) were prepared by NCE under the direction of the Interim Public Works Director, and advertised on Planet Bids for a four-week period commencing on May 20, 2025, in accordance with Public Contract Code Section 20164; and
WHEREAS, On March 26, 2024, the City Council adopted Resolution No. 24-040 N.C., approving a Project Labor Agreement (PLA) with the Napa-Solano Building and Construction Trades Council and its affiliated local unions. The PLA applies to future City capital projects exceeding a threshold of $750,000. As the engineer’s estimate for this project exceeded that threshold, the contract included provisions to comply with this requirement; and WHEREAS, on June 17, 2025, two (2) sealed bids were received, opened, and publicly read by the Deputy City Clerk; and
WHEREAS, Ghilotti Bros.,Inc. submitted the lowest responsive and responsible bid of $3,689,824.98; and

Page 709 of 994 ends

WHEREAS, the Plans and Specifications were presented to and considered by the City Council at a regular meeting held on July 22, 2025; and
WHEREAS, projects that involve the repair and maintenance of highways and streets, sidewalks, gutters, and similar facilities (this includes road grading for the purpose of public safety), and other alterations such as the addition of safety enhancement facilities, including but not limited to high visibility crosswalks and advanced warning signs are categorically exempt from environmental review pursuant to Section 15301(c) of the CEQA Guidelines.

NOW, THEREFORE, BE IT RESOLVED that the City Council hereby finds that the 2025 Cape Seal Project (MP2025) is categorically exempt from environmental review pursuant to CEQA Guidelines Section 15301(c) because the project repairs and maintains existing streets and sidewalks.

BE IT FURTHER RESOLVED that the City Council, having reviewed the Plans and Specifications for the 2025 Cape Seal Project (MP2025), hereby approves and adopts said Plans and Specifications for the project.

BE IT FURTHER RESOLVED that an invitation for bids was duly advertised.

BE IT FURTHER RESOLVED that Ghilotti Bros., Inc. of San Rafael, California, was determined to be the lowest responsive and responsible bidder and is hereby awarded a contract in the amount of $3,689,824.98, and said contract is awarded to said low bidder at the prices bid.

BE IT FURTHER RESOLVED that all other bids, to-wit:

Team Ghilotti, Inc. $4,141,700.00
are hereby deemed rejected upon the full execution of the contract documents by the successful bidder, with notice of rejection to be given thereupon by the City Clerk.

BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the construction contract between the City of Vallejo and Ghilotti Bros., Inc., in the amount of $3,689,824.98 plus contingency, with any modifications recommended by the City Attorney, and the City Clerk to attest the signing of that contract.

BE IT FURTHER RESOLVED that the City Manager, or his designee, is hereby authorized to execute future Contract Change Orders not to exceed the approved Project budget.

Adopted by the City Council of the City of Vallejo at a special meeting held on July 22, 2025, with the following vote:

AYES:

NOES:

Page 710 of 994 ends

ABSENT:
____________________________________

ANDREA SORCE, MAYOR
ATTEST: _____________________________________
DAWN G. ABRAHAMSON, CITY CLERK

Page 711 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 1 of 192 Cape Seal 2025 Project No. MP2025

CONTRACT
for

CITY OF VALLEJO
CAPE SEAL 2025 PROJECT
PROJECT NO. MP2025
THIS CONTRACT (“Contract”) made and entered into this 23 rd day of July 2025, at Vallejo, California, by and between the City of Vallejo, a municipal corporation of the State of California, hereinafter called City, and Ghilotti Bros., Inc., a California corporation, hereinafter called CONTRACTOR.

WITNESSETH:

WHEREAS, the City Council of said City heretofore caused Plans and Specifications for the work hereinafter mentioned to be prepared, and thereafter did approve and adopt said Plans and Specifications; and
WHEREAS, the City Council of said City did cause to be noticed for the time and in the manner required by law a notice inviting sealed bids for the performance of said work; and WHEREAS, Contractor, in response to such notice, submitted to the City Council of said City within the time specified in said notice, and in the manner provided for therein, a sealed bid for the performance of the work specified in said Plans and Specifications, which said bid and proposal, and the other bids and proposals submitted in response to said notice, the City Council of City, by and through its authorized representatives, publicly opened and canvassed in the manner provided by law; and
WHEREAS, Contractor was the lowest responsive and responsible bidder for the performance of said work, and said City Council of City, as a result of the canvass of said bids, did determine and declare Contractor to be the lowest responsive and responsible bidder for the work and award a contract, therefore.

NOW, THEREFORE, in consideration of the above, it is mutually agreed between the parties hereto as follows, to wit:

1. SCOPE OF WORK
The work to be done, in general terms, consists of:

Furnishing all labor, materials, equipment, incidentals and services for the construction and completion of the CITY OF VALLEJO 2025 CAPE SEAL PROJECT. The work includes but is not limited to:
•Pavement maintenance of existing roadway improvements including crack seal, digout repairs, asphalt concrete patch paving, and cape seal.
•Developing and implementing a water pollution program. •Implementing temporary traffic control for street closures and detours.

Page 712 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 2 of 192 Cape Seal 2025 Project No. MP2025
•Adjusting utility covers to grade if needed.
•Removing and replacing pavement striping, markings and markers. •Removing and installing ADA compliant curb ramps (various cases) •Removing and replacing curb, gutter, and sidewalk sections.

The Contractor shall provide all labor, tools, and materials for a complete and working project in conformance with the intent shown on the Plans and as provided for and set forth in said Plans, Specifications, and any addenda that were issued prior to the date of bid, which said Plans and Specifications are hereby referred to by such reference, incorporated herein, and made a part of this Contract.

The following documents shall constitute the Contract Documents:
(a) This Contract:
(i) Exhibit A – Compensation
(ii) Exhibit B – Project Labor Agreement;
(iii) Exhibit C – Sample Contract Change Order
(iv) Exhibit D – Faithful Performance Bond and Payment (Labor and Materials) Bond; (v) Exhibit E – Plans, prepared by Public Works - Engineering and entitled Plans for 2025 Cape Seal, signed and stamped by the City Engineer on May 16th, 2025; (vi) Exhibit F - Specifications signed and stamped by the City Engineer on May 16 th, 2025;
(vii) Exhibit G – Links for this contract:
- Standard Specifications of the State of California, Department of Transportation dated 2023;
- City of Vallejo Standard Specifications and Standard Drawings dated December 20, 2011;
- Vallejo Flood & Wastewater District Engineering Design Standards dated July 2020, and Engineering Standard Details, dated July 2020; and (b) Any other documents identified as such in the Contract Documents.

2. TERMS AND CONDITIONS
This Contract consists of the Contract Documents identified in subsections (a) through (b) of Section 1 above, all of which are incorporated herein by reference as though set forth in full, and all of which are part of this Contract, and Contractor and City agree to comply with and fulfill all obligations, promises, covenants and conditions imposed upon each of them in the Contract Documents. All of said work done under this Contract shall be performed to the satisfaction of the City Council, or its representative, who shall have the right to reject any and all materials and supplies furnished by Contractor which do not strictly comply with said plans and specifications, together with the right to require Contractor to replace any and all work furnished by Contractor which shall not either in workmanship or material be in strict accordance with said plans and specifications.

3. Contractor agrees to receive and accept the prices set forth in its proposal in an amount not to exceed of Three Million, six hundred eighty-nine thousand, eight hundred twenty- four dollars and ninety-eight cents ($3,689,824.98) as full compensation for furnishing all

Page 713 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 3 of 192 Cape Seal 2025 Project No. MP2025
materials and for doing all the work contemplated and embraced in this agreement, also for all loss or damage arising out of the nature of the work aforesaid, or from the action of the elements or from any foreseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its acceptance by the City and for all risks of every description, connected with the work; also for all discontinuance of work, and for well and faithfully completing the work, and the whole thereof, in the manner and according to the Plans and Specifications and the requirements of the Engineer under them.

By my signature as Contractor, I certify that I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract.

Pursuant to Section 1700, and following, of the California Labor Code, the Contractor shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. The Contractor shall forfeit, as penalty to the City, One hundred Dollars ($100.00) for each calendar day or portion thereof, for each workman paid less than the stipulated prevailing rates for any work done under the contract by it or by any subcontractor under it, in violation of the provisions of such Labor Code.

City shall pay Contractor the sums set forth in its Proposal in accordance with all of the terms and conditions of the Contract Documents.

The Contractor shall be permitted to substitute designated securities for any moneys withheld by the City of Vallejo to insure performance under the Contract. This right of substitution shall be exercised in the manner and subject to the conditions specified in the Contract Documents. The provisions of Public Contract Code section 22300 are incorporated herein by reference as though set forth in full and shall govern the substitution of securities and/or escrow account.

The person signing this Agreement for Contractor hereby represents and warrants that he/she is fully authorized to sign this Agreement on behalf of Contractor. [SIGNATURES ARE ON THE FOLLOWING PAGE]

Page 714 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 4 of 192 Cape Seal 2025 Project No. MP2025
IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands and affixed their seal the day and year first above written.

GHILOTTI BROS. INC.,
a California corporation

CITY OF VALLEJO,
a municipal corporation
By: By:

Michael M. Ghilotti
President
Andrew Murray
City Manager
Date:_____________________
Date: Attest:

By:

Dawn G. Abrahamson
City Clerk
Approved as to Content:
(City Seal) By:

Oscar Alcantar
Interim Public Works Director
Approved as to Form:

By:

Veronica A. F. Nebb
City Attorney
Approved as to Insurance:

By:

Armond Sarkis
Risk Manager

Page 715 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 5 of 192 Cape Seal 2025 Project No. MP2025

EXHIBIT A

COMPENSATION

Page 716 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 6 of 192 Cape Seal 2025 Project No. MP2025

Page 717 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 7 of 192 Cape Seal 2025 Project No. MP2025

Page 718 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 8 of 192 Cape Seal 2025 Project No. MP2025

EXHIBIT B

PROJECT LABOR AGREEMENT

Page 719 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 9 of 192 Cape Seal 2025 Project No. MP2025

Page 720 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 10 of 192 Cape Seal 2025 Project No. MP2025

Page 721 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 11 of 192 Cape Seal 2025 Project No. MP2025

Page 722 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 12 of 192 Cape Seal 2025 Project No. MP2025

Page 723 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 13 of 192 Cape Seal 2025 Project No. MP2025

Page 724 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 14 of 192 Cape Seal 2025 Project No. MP2025

Page 725 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 15 of 192 Cape Seal 2025 Project No. MP2025

Page 726 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 16 of 192 Cape Seal 2025 Project No. MP2025

Page 727 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 17 of 192 Cape Seal 2025 Project No. MP2025

Page 728 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 18 of 192 Cape Seal 2025 Project No. MP2025

Page 729 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 19 of 192 Cape Seal 2025 Project No. MP2025

Page 730 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 20 of 192 Cape Seal 2025 Project No. MP2025

Page 731 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 21 of 192 Cape Seal 2025 Project No. MP2025

Page 732 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 22 of 192 Cape Seal 2025 Project No. MP2025

Page 733 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 23 of 192 Cape Seal 2025 Project No. MP2025

Page 734 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 24 of 192 Cape Seal 2025 Project No. MP2025

Page 735 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 25 of 192 Cape Seal 2025 Project No. MP2025

Page 736 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 26 of 192 Cape Seal 2025 Project No. MP2025

Page 737 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 27 of 192 Cape Seal 2025 Project No. MP2025

Page 738 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 28 of 192 Cape Seal 2025 Project No. MP2025

Page 739 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 29 of 192 Cape Seal 2025 Project No. MP2025

Page 740 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 30 of 192 Cape Seal 2025 Project No. MP2025

Page 741 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 31 of 192 Cape Seal 2025 Project No. MP2025

Page 742 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 32 of 192 Cape Seal 2025 Project No. MP2025

Page 743 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 33 of 192 Cape Seal 2025 Project No. MP2025

EXHIBIT C

SAMPLE CONTRACT CHANGE ORDER
SAMPLE

Page 744 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 34 of 192 Cape Seal 2025 Project No. MP2025
SAMPLE

Page 745 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 35 of 192 Cape Seal 2025 Project No. MP2025

EXHIBIT D

FAITHFUL PERFORMANCE BOND
for

CITY OF VALLEJO
CAPE SEAL 2025 PROJECT
PROJECT NO. MP2025
KNOW ALL MEN/WOMEN BY THESE PRESENTS, THAT WE, ________________________, as Principal, and ____________________________, as Surety, are held and firmly bound unto the City of Vallejo, a municipal corporation of the State of California, hereinafter called the City, in the penal sum of ____________________ Dollars ($________________), and no more, for the work described below, for the payments of which sum in lawful money of the United States of America well and truly to be made to the City of Vallejo, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents as herein above provided.

WHEREAS, that the Principal has entered into a contract with said City for the construction of:
2025 CAPE SEAL PROJECT
NOW, THEREFORE, the condition of this obligation is such that if the above bounded Principal shall in all things stand to abide by, and well and truly keep and perform the covenants, conditions and agreements in the foregoing contract agreed on his/her or their part to be kept and performed at the time and in the manner herein specified, and shall indemnify and save harmless the City of Vallejo, its officers, agents and employees as therein stipulated, then this obligation shall become null and void; otherwise, it shall remain in full force and virtue to guarantee Contractor’s faithful performance of its obligations in the Contract Documents, and Principal and Surety, in the event suit is brought on this bond, will pay to the Obligee such reasonable attorneys' fees as may be fixed by the Court.

The Surety herein, for value received, hereby stipulates, and agrees that no change, extension of time, alteration, addition or modification to the terms and conditions of said contract, or the specifications accompanying the same shall in any manner affect its obligations on this bond and said Surety does hereby waive notice of any such change, extension, alteration or addition. Said Surety hereby waives the provisions of Section 2819 and 2845 of the Civil Code of the State of California.

Page 746 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 36 of 192 Cape Seal 2025 Project No. MP2025
IN WITNESS WHEREOF, the above bounded parties have executed this Instrument under their several seals this ___________ day of __________________, 20_______. The name and corporate seal of each corporate party being hereto affixed, and these presents duly signed by its undersigned representative pursuant to authority of its governing body.

PRINCIPAL SURETY
SURETY INFORMATION:

Contact Person:

Name of Company:

Address:

Telephone No.: Fax
No.:

NOTE: (1) Signatures of those executing for the Surety must be properly acknowledged.
(2) This Bond must be in an amount equal to 100% of the amount bid.

APPROVED AS TO FORM:

Veronica A. F. Nebb
City Attorney

Page 747 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 37 of 192 Cape Seal 2025 Project No. MP2025

PAYMENT (LABOR AND MATERIALS) BOND
for

CITY OF VALLEJO
CAPE SEAL 2025 PROJECT
PROJECT NO. MP2025
KNOW ALL MEN/WOMEN BY THESE PRESENTS, WHEREAS, that the City of Vallejo, a municipal corporation of the State of California, acting through its City Council, has awarded:
hereinafter designated as the Principal, a contract for:

CAPE SEAL 2025 PROJECT NO. MP2025
AND WHEREAS, said Principal is required to furnish a bond in connection with said contract, provided that if said Contractor, or any of his/her or its subcontractors, shall fail to pay for any materials, provisions, provender or other supplies, or teams, used in, upon, for or about the performance of the work contracted to be done, or any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to such labor, the Surety of this bond will pay the same.

NOW, THEREFORE, We, the Principal, and _____________________, as Surety, are held and firmly bound unto the City of Vallejo, a municipal corporation, hereinafter called City, in the penal sum of _____________________________ Dollars ($_________________), and no more, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents, as herein provided.

The condition of this obligation is such that, if said Principal, or his/her or its Subcontractors, shall fail to pay for any materials, provisions, provender or other supplies or teams used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, as required by the provisions of California Civil Code, commencing with Section 9550, and providing that the persons, companies or corporations so furnishing said materials, provisions, or other supplies, appliances or power used in, for or about the performance of the work contracted to be executed or performed, or any person, company, or corporation, renting, or hiring implements, or machinery, or power, for, or contributing to said work to be done, or any person who performs work or labor upon the same, or any person who supplies both work and materials therefor, shall have complied with the provisions of said Title 15, the Surety, or Sureties, hereon will pay the same in an amount not exceeding the sum specified in his/her or its bond, and also, in case suit is brought upon this bond, a reasonable attorney's fee to be fixed by the Court, then this obligation shall become null and void; otherwise, it shall remain in full force and virtue.

This bond shall inure to the benefit of any and all persons, companies and corporations entitled to file claims under Section 9100 of the Civil Code of the State of California so as to give a right of action to them or their assigns in any suit brought upon this bond.

Page 748 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 38 of 192 Cape Seal 2025 Project No. MP2025
The Surety herein, for value received, hereby stipulates, and agrees that no change, extension of time, alteration, addition or modification to the terms and conditions of said contract, or the specifications accompanying the same, shall in any manner affect its obligation on this bond, and said Surety does hereby waive notice of any such change, extension, alteration, or addition.

IN WITNESS WHEREOF, the above bounded parties have executed this Instrument under their several seals this ________ day of _______________________, 20_______. The name and corporate seal of each corporate party being hereto affixed, and these presents duly signed by its undersigned representative pursuant to authority of its governing body.

PRINCIPAL SURETY
SURETY INFORMATION:

Contact Person:

Name of Company:

Address:

Telephone No.: Fax
No.:

NOTE: (1) Signatures of those executing for the Surety must be properly acknowledged.
(2) This Bond must be in an amount equal to 100% of the amount bid.

APPROVED AS TO FORM:

Veronica A. F. Nebb
City Attorney

Page 749 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 39 of 192 Cape Seal 2025 Project No. MP2025

EXHIBIT E
PLANS

Page 750 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 40 of 192 Cape Seal 2025 Project No. MP2025

Page 751 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 41 of 192 Cape Seal 2025 Project No. MP2025

Page 752 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 42 of 192 Cape Seal 2025 Project No. MP2025

Page 753 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 43 of 192 Cape Seal 2025 Project No. MP2025

Page 754 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 44 of 192 Cape Seal 2025 Project No. MP2025

Page 755 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 45 of 192 Cape Seal 2025 Project No. MP2025

Page 756 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 46 of 192 Cape Seal 2025 Project No. MP2025

Page 757 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 47 of 192 Cape Seal 2025 Project No. MP2025

Page 758 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 48 of 192 Cape Seal 2025 Project No. MP2025

Page 759 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 49 of 192 Cape Seal 2025 Project No. MP2025

Page 760 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 50 of 192 Cape Seal 2025 Project No. MP2025

Page 761 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 51 of 192 Cape Seal 2025 Project No. MP2025

Page 762 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 52 of 192 Cape Seal 2025 Project No. MP2025

EXHIBIT F

SPECIFICATIONS

PUBLIC WORKS DEPARTMENT

SPECIAL PROVISIONS
The work embraced herein shall be done in accordance with the Standard Specifications dated 2023 and Standard Plans dated 2023, issued by the State of California Department of Transportation and the most recent edition of the Standard Plans of the City of Vallejo, insofar as the same may apply and in accordance with the Project Plans and these Special Provisions and the Technical Specifications.

These Special Provisions are additions, modifications, and/or clarifications to the State Standard Specifications. The numbers shown in parentheses in the sections and subsections headings refer to the Caltrans Standard Specifications.

Refer to Section 5-1.04 of these Special Provisions for the order of precedence of the above referenced contract documents in case of any conflict.

Page 763 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 53 of 192 Cape Seal 2025 Project No. MP2025
SECTION 1: DEFINITIONS AND TERMS
1-1.01 GENERAL
Unless the context otherwise requires, wherever in the Specifications and other Contract Documents the following abbreviations and terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as provided in this Section 1. Working titles having a masculine gender, such as "workman" and "journeyman" and the pronoun "he,” are utilized in the Specifications for the sake of brevity and are intended to refer to persons of either gender.
1-1.02 ABBREVIATIONS
AASHTO American Association of State Highway and Transportation Officials AISC American Institute of Steel Construction
ANSI American National Standards Institute
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
AWS American Welding Society
AWWA American Water Works Association
IEEE Institute of Electrical and Electronics Engineers
NEMA National Electrical Manufacturers Association
UL Underwriters' Laboratories Inc.
1-1.03 ACCEPTANCE
The formal written acceptance by the Vallejo City Council of an entire work of improvement that has been completed in all respects in accordance with the Contract Documents and any modifications thereto previously authorized in writing.
1-1.04 GLOSSARY
Unless noted otherwise, the following terms have the following meanings:

Addenda: Written or graphic instruments issued before the opening bids, which modify or interpret the Notice to Bidders, Instructions to Bidders, Bid Proposal Form, Addenda (if any), Special Provisions, Technical Specifications, and/or Plans by additions, deletions, clarifications, or corrections.

Agreement or Contract: The signed agreement between the City and Contractor.

Architect: The private engineering firm employed to prepare the plans, specifications, and estimate and perform design services during construction of this project.

Bid Bond: The cash, cashier’s check, certified check, or bidder’s bond companying the proposal submitted by the bidder, as a guaranty that the bidder will enter a contract with the Public Works Department of the City of Vallejo for the performance of the work if the contract is awarded to the bidder.

Bidding Documents: The Notice to Bidders, Instruction to Bidders, Bid Proposal Form, and Addenda (if any); the

Page 764 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 54 of 192 Cape Seal 2025 Project No. MP2025
Special Provisions, Technical Specifications, Standard Specifications, the Exhibits (including bonds), and the Drawings (also defined as “Plans”).

Business Day: All days except Saturdays, Sundays, and any holiday set forth in California Government Code section 6700.

Calendar Day: Any day of the week including a Business Day.

Change Order: A written document duly approved and executed by the City, which changes the scope of the Work, the Contract Price, or the Contract Time.

City: The City of Vallejo, California.

City Council: The City Council of the City of Vallejo, California, or its authorized agent.

City Engineer: The City Engineer of the City of Vallejo or their authorized agent(s) acting within the scope of the duties delegated to them.

Claim: A request by the Contractor for 1) the payment of additional compensation for any issues. 2) an extension of time for the performance of the Work or 3) any other relief with reference to the terms of the Contract, including any disputes or question related to the Contract Documents.

Construction Contract or Agreement: The signed agreement between the City and Contractor.

Contract Amount or Contract Sum: The amount listed on the Construction Agreement as the contractor’s total compensation.

Contract Documents: All of the documents collectively listed as such in the Contract, including the Notice to Bidders; the Instructions for Bidders; Addenda, if any; the Bid Proposal, and attachments thereto; the Contract; the Notice of Award and Notice to Procced; Certificates of Insurance and Endorsements; the Faithful Performance, Labor and Materials, and Warranty Bonds; the Special Provisions; the Technical Specifications; the Project Drawings and Specifications; Change Orders, if any; and any other documents expressly made part of the Contract Documents.

Contract Price: The total compensation to be paid to the Contractor for performance of the Work, as set forth in the Contract and as amended by a Change Order or adjusted for an Allowance. The Contract Price is not subject to adjustments due to inflation or due to the increased cost of labor, material, or equipment following submission of the Bid Proposal.

Contract Time: The number of Working Days for performance of the Work, as set forth in the Contract and as amended by a Change Order.

Contractor: The person or persons, firm partnership, corporation, or combination thereof, private of municipal, who have entered into a contract with the City of Vallejo, as party or parties of the second part of their legal representatives.

Day: A calendar day unless stated otherwise.

Department: The Public Works Department of the City of Vallejo.

Director: The Director of the Public Works of the City of Vallejo.

Drawing: The City-approved plans and graphical depictions of the Project requirements and does not include Shop Drawings.

Page 765 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 55 of 192 Cape Seal 2025 Project No. MP2025
Final Compensation: Payment to the Contractor of the unpaid Contract Price, including release of the undisputed retention, less amounts withheld pursuant to the Contract Documents, including liquidated damages, up to 125% of the amount of any unreleased stop notice, amounts subject to setoff, up to 150% of any unresolved third-party claim for which Contractor is required to indemnify City, and up to 150% of any amount in dispute as authorized by Public Contract Code Section 71017.

Engineer: The City Engineer of the City of Vallejo or other authorized designee such as the City Inspector.

Laboratory: The laboratory designated by the City of Vallejo.

Legal Holidays: Those Days designated as City holidays and those days designated in the Government Code or as stated in the Standard Specifications.

Liquidated Damages: The amount prescribed in the specifications or contract, to be paid to the City of Vallejo or to be deducted from any payments due or to become due the Contractor for each day’s delay in completing the whole or any specified portion of the work beyond the time allowed in the specifications. The Liquidated Damages amount is set at $1,500.00 per Calendar Day for this contract.

Mobilization: Preparatory work that must be performed or costs incurred before starting work on the various items on the job site (Public Contract Code § 10104).

Plans: The official project plans, typical cross sections, working drawings, and supplemental drawings, or reproductions thereof, approved by the Engineer, which show location, character, dimensions, and details of the work to be performed. These documents are to be considered as a part of the plans.

Project Plans: The Project Plans are specific details and dimensions peculiar to the work and are supplemented by the Standard Plans insofar as the same may apply.

Project or Work: See Work.

Project Site: Location of the Work.

Project Manager: The person designated by the City of Vallejo to manage all aspects of the project, if so, designated by the Special Provisions.

Proposal Form: The approved form upon which the Public Works of the City of Vallejo requires formal bids be prepared and submitted for the work.

Public Contract Code: California Public Contract Code.

Qualified Contractor or Subcontractor: A contractor or subcontractor currently registered with the California Department of Industrial Relations and qualified to perform public work pursuant to Labor Code section 1725.

Requests for Information: A request from the Contractor, or one of its subcontractors, to the City, seeking an interpretation or clarification of some requirement of the contract documents submitted to the City in the form required by the contract. The contractor shall clearly and concisely set forth the issue for which it seeks clarification of interpretations and why a response is needed from the City. The contractor shall, in the written request, set forth interpretation or understanding of the contract’s requirements along with the reasons why it has reached such an understanding. Responses from the City shall not change any requirements of the contract documents unless noted in the Request for Information Response issued by the City.

Special Provisions: The special provisions are specific clauses setting forth conditions or requirements peculiar to the work and supplementary to the Standard Specifications.

Specifications: The directions, provisions and requirements contained in the Standard Specifications as

Page 766 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 56 of 192 Cape Seal 2025 Project No. MP2025
supplemented by these Special Provisions. Whenever the term “the specifications” or “the Standard Specifications” is used in this document, it means the provisions set for in the 2023 Edition of the Caltrans Standard Specifications.

Standard Plans: The Standard Specifications and Standard Drawings issued by the Public Works Department of the City of Vallejo.

State: The State of California or the City of Vallejo as the context requires.

Submittal/Shop Drawings: Any technical submittals, shop drawings, or samples, including supporting catalog cuts, manufacturer’s literature sketches or drawings, calculations, and other pertinent data, required by any technical specification in these contract documents. The contractor shall transmit to the City submittal/shop drawings shall be in sufficient detail to enable the City to review the information and determine that the contractor clearly understands the requirements of the contract documents.

Substitution/Or Equal Submittals: A request from the contractor to substitute a material, device, product, fixture, form, type of construction or process called for in the contract documents with another item that shall be substantially equal in all respects to that indicated or supplied.

Work or Project: The entire Project which is the subject of the Contract. The term “Work” as applied to the Contractor includes any labor, materials and necessary tools and equipment.

Working Days: Working days are Monday through Friday except for Legal Holidays. 1-1.07 BIDDER
Any individual, firm, partnership, limited liability company, corporation, or combination thereof, submitting a proposal for the work contemplated, acting directly or through a duly authorized representative. 1-1.09 CONTRACT
The written agreement covering the performance of the work and the furnishing of labor, materials, tools, and equipment in the construction of the work. All documents comprising the Contract may also be referred to as the “Contract Documents.”
1-1.10 CONTRACT DOCUMENTS
All of the documents collectively listed as such in the Contract, including the Notice to Bidders; the Instructions for Bidders; Addenda, if any; the Bid Proposal, and attachments thereto; the Contract; the Notice of Award and Notice to Procced; Certificates of Insurance and Endorsements; the Faithful Performance, Labor and Materials, and Warranty Bonds; the Special Provisions; the Technical Specifications; the Project Drawings and Specifications; Change Orders, if any; and any other documents expressly made part of the Contract Documents. 1-1.12 DAYS
Unless otherwise designated, days as used in the Specifications will be understood to mean calendar days.

Page 767 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 57 of 192 Cape Seal 2025 Project No. MP2025
1-1.19 ENGINEER'S ESTIMATE
The list of estimated quantities of work to be performed as contained in the "Proposal Form." 1-1.20 FEDERAL AGENCIES
Whenever, in the Specifications, reference is made to any Federal agency or officer, the reference shall be deemed made to any agency or officer succeeding in accordance with law to the powers, duties, jurisdiction and authority of the agency or officer mentioned.
1-1.21 FIXED COSTS
Any necessary labor, material and equipment costs directly expended on the item or items under consideration which remain constant regardless of the quantity of the work done. 1-1.25-1 LEGAL HOLIDAYS
Those days designated as City observed holidays specifically:
(a) New Year's Day,
(b) Martin Luther King, Jr. Day,
(c) President’s Day,
(d) Memorial Day,
(e) Juneteenth Day,
(f) Independence Day,
(g) Labor Day,
(h) Indigenous Peoples’ Day,
(i) Veterans' Day,
(j) Thanksgiving Day,
(k) Day after Thanksgiving,
(l) Christmas Day
1-1.26 LIQUIDATED DAMAGES
The amount prescribed in the Contract Documents, to be paid to the City of Vallejo or to be deducted from any payments due or to become due the Contractor for each day's delay in completing the whole or any specified portion of the work beyond the time allowed in the Contract Documents. 1-1.26-1 MUTCD OR CA MUTCD
The State of California, Department of Transportation publication entitled “California Manual on Uniform Traffic Control Devices.”

Page 768 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 58 of 192 Cape Seal 2025 Project No. MP2025
1-1.29 DRAWINGS
The official project drawings (City-approved Plans) and Standard Plans, profiles, typical cross sections, working drawings and supplemental drawings, or reproductions thereof, approved by the Engineer, which show the location, character, dimensions and details of the work to be performed. These documents are to be considered as a part of the drawings. In the above definition, the following terms are defined as follows:
1-1.30 PROJECT DRAWINGS
The project drawings (City-approved Plans) are specific details and dimensions peculiar to the work and are supplemented by the Standard Plans insofar as the same may apply. 1-1.31 PROPOSAL
The offer of the Bidder for the work when made out and submitted on the prescribed Proposal Form, properly signed and guaranteed.
1-1.32 PROPOSAL FORM
The approved form (Bid Proposal) upon which the City of Vallejo requires formal bids be prepared and submitted for the work.
1-1.33 PROPOSAL GUARANTY
The cash, cashier's check, certified check or Bidder's bond accompanying the proposal submitted by the Bidder, as a guaranty that the Bidder will enter into a contract with the City of Vallejo for the performance of the work if the Contract is awarded to the Bidder.
1-1.37 SPECIAL PROVISIONS
The special provisions are specific clauses setting forth conditions or requirements peculiar to the work and supplementary to these Specifications.
1-1.38 SPECIFICATIONS
The directions, provisions and requirements contained in the Special Provisions, General Provisions, Wage and Equipment Rate and Technical Specifications section as supplemented by the Standard Specifications, City of Vallejo Standard Specifications and Standard Drawings. Whenever the term "these Specifications" or "these Standard Specifications" is used in this Contract, it means the provisions set forth in this Contract. “Specifications” or “Standard Specifications” also means the State of California, Department of Transportation, Standard Specifications, 2023 edition, Sections 10 through 95 only.

Page 769 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 59 of 192 Cape Seal 2025 Project No. MP2025
1-1.48 WORK
All the work specified, indicated, shown, contemplated or inferable from the Contract Documents to construct the improvement, including all alterations, amendments or extensions thereto made by Contract Change Order.

END OF SECTION

Page 770 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 60 of 192 Cape Seal 2025 Project No. MP2025
SECTION 2: PROPOSAL REQUIREMENTS AND CONDITIONS
2-1.01 CONTENTS OF PROPOSAL FORMS
Prospective bidders must use City of Vallejo proposal forms which will refer to the special provisions and project drawings for the work to be done and will include a schedule of items for which bid prices are asked, showing the approximate estimate of the various quantities and kinds of work to be performed or materials to be furnished. 2-1.02 APPROXIMATE ESTIMATE
The quantities given in the proposal form and Contract are approximate only, being given as a basis for the comparison of bids. The City of Vallejo does not, expressly or by implication, agree that the actual amount of work will correspond therewith, and reserves the right to increase or decrease the amount of any class or portion of the work, or to omit portions of the work.
2-1.03 EXAMINATION OF PLANS, SPECIFICATIONS, CONTRACT, AND SITE OF WORK All bidders shall carefully and completely examine the site of the work contemplated and the Contract Documents and perform all tests and inspections necessary to inform Bidder of all conditions that may be encountered, the character, quality and scope of work to be performed, and the quantities of materials to be furnished. The submission of a Proposal Form shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality and scope of work to be performed, the quantities of materials to be furnished and as to the requirements of the Contract Documents.

Where the City of Vallejo has made investigations of site conditions, including subsurface conditions in areas where work is to be performed under the Contract, or in other areas, some of which may constitute possible local material sources, bidders and Contractor may, upon written request, inspect the records of the City of Vallejo as to those investigations subject to and upon the conditions hereinafter set forth. The investigations are made only for the purpose of study and design.

The records of investigations, project records, log of test borings, record of geotechnical data, investigation of subsurface conditions, cross-sections, contour maps, and any other investigations provided by City of Vallejo, are a part of the Contract Documents.

The availability or use of information described in this section is not to be construed in any way as a waiver of the provisions of the first paragraph in this section and a Bidder or Contractor shall make their own investigation and examination to be satisfied as to conditions to be encountered in the performance of the work.

No information derived from the inspection of investigations or compilation thereof made by the City of Vallejo or from the Engineer, or their consultants, will in any way relieve the Bidder or Contractor from any risk or from properly fulfilling the terms of the Contract.
2-1.04 ADDENDUM
If discrepancies or apparent errors are found in the Contract Documents prior to the date of bid opening, bidders shall submit a written request for clarification to City Engineer, which response to said request will be given in the form of addenda to all bidders, if time permits.

Page 771 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 61 of 192 Cape Seal 2025 Project No. MP2025
The correction of any discrepancies in, or omissions from the drawings, Specifications, or other Contract Documents, or any interpretation thereof, during the bidding period will be made only by an addendum issued in writing by the City of Vallejo. A copy of each such addendum issued by the City of Vallejo will be electronically mailed, or delivered to each person receiving a set of the Contract Documents and shall be made a part of the Contract. Any other interpretation or explanation of such documents will not be considered binding. 2-1.05 PROPOSAL FORMS
The City of Vallejo will furnish to each Bidder a standard Proposal Form, which, when filled out and executed may be submitted as that Bidder's bid. Bids not presented on forms so furnished, and copies or facsimiles of the Bidder's completed and executed Proposal Forms submitted as a bid may be rejected. 2-1.06 (BLANK)
2-1.07 PROPOSAL GUARANTY
The proposal must be accompanied by cash, a Bidder's bond, certified check, or cashier's check in an amount not less than ten percent (10%) of the amount bid. The Bidder's bond must be signed in favor of the City of Vallejo, and the certified check or cashier's check must be made payable to the City of Vallejo. 2-1.08 WITHDRAWAL OF PROPOSALS
Any bid may be withdrawn at any time prior to the date and time fixed for the opening of bids only by written request for the withdrawal of the bid filed at the location at which the bid was received by the City of Vallejo. The request shall be executed by the Bidder or the Bidder's duly authorized representative. The withdrawal of a bid does not prejudice the right of the Bidder to file a new bid. Whether or not bids are opened exactly at the time fixed for opening bids, a bid will not be received after that time, nor may any bid be withdrawn after the time fixed for the opening of bids.
2-1.09 PUBLIC OPENING OF PROPOSALS
Proposals will be opened and read publicly at the time and place indicated in the "Notice to Contractors." Bidders or their authorized agents are invited to be present. 2-1.095 RELIEF OF BIDDERS
Attention is directed to the provisions of Public Contract Code Sections 5100 to 5107, inclusive, concerning relief of bidders and in particular to the requirement therein, that if the Bidder claims a mistake was made in the bid presented, the Bidder shall give the City of Vallejo written notice within 5 days after the opening of the bids of the alleged mistake, specifying in the notice in detail how the mistake occurred.

Page 772 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 62 of 192 Cape Seal 2025 Project No. MP2025
2-1.10 DISQUALIFICATION OF BIDDERS
More than one proposal from an individual, firm, partnership, corporation, or combination thereof under the same or different names will not be considered. Reasonable grounds for believing that any individual, firm, partnership, limited liability company, corporation or combination thereof is interested in more than one proposal for the work contemplated may cause the rejection of all proposals in which that individual, firm, partnership, corporation, or combination thereof is interested. If there is reason for believing that collusion exists among the Bidders any or all proposals may be rejected. Proposals in which the prices appear unbalanced may be rejected.

END OF SECTION

Page 773 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 63 of 192 Cape Seal 2025 Project No. MP2025
SECTION 3: AWARD AND EXECUTION OF CONTRACT
3-1.01 AWARD OF CONTRACT
The right is reserved to reject any and all proposals.

The award of the Contract, if it be awarded, will be to the lowest responsible Bidder whose proposal complies with all the requirements prescribed. The award, if made, will be made within 60 days after the opening of the proposals.

This period will be subject to extension for such further period as may be agreed upon in writing between the City of Vallejo and the Bidder concerned.

All bids will be compared on the basis of the Engineer's Estimate of the quantities of work to be done.

The low bid will be determined by adding the sum of the Total Amount of Bidder’s Base Bid, the Total Amount of all alternates (if any) .

When a price is quoted in both words and figures, the words shall prevail in case of a discrepancy. In the event of a discrepancy between Bidder’s Unit Price and Bidder’s Total Amount, the Unit Price shall prevail. In the event of a discrepancy between Bidder’s Total Amount and the Bid Total, the Unit Price and correct Total Amount shall prevail. 3-1.02 BONDS
Within ten (10) days of Contractor's receipt of Contract from City of Vallejo, the Contractor shall furnish corporate surety bonds to the benefit of the City of Vallejo, issued by a surety company acceptable to the City of Vallejo and authorized and admitted to do business in the State of California, as follows:

A. Faithful Performance Bond -- In a sum not less than one hundred percent (100%) of the total contract price as set forth in the Contract to guarantee the Contractor's faithful performance of all covenants and stipulations of the Contract. The bond shall contain a provision that the surety thereon waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.

B. Payment (Labor and Materials) Bond -- In a sum not less than one hundred percent (100%) of the total contract price as set forth in the Contract to guarantee the payment of wage, and bills contracted for materials, supplies, or equipment used in the performance of the Contract. The bond shall be in accordance with the provisions of Sections 3225, 3226, and 3247 to 3252, inclusive, of the Civil Code of the State of California, and Section 13020 of the Unemployment Insurance Code of the State of California. Said bond shall also contain a provision that the surety thereon waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.

Faithful Performance Bond and Payment Bond shall be on the forms provided by City of Vallejo.

The surety companies shall familiarize themselves with all provisions and conditions of the Contract. It is understood and agreed that the surety or sureties waive the right of special notification of any modifications or alterations, omissions or reductions, extra or additional work, extensions of time, or any other act or acts by the City of Vallejo or its authorized agents under the terms of the Contract; and failure to so notify the surety companies of such changes shall in no way relieve the surety or sureties of their obligations under this Contract. The surety expressly waives the provisions of Sections 2819 and 2845 of the Civil Code of the State of California.

Page 774 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 64 of 192 Cape Seal 2025 Project No. MP2025
3-1.03 EXECUTION OF CONTRACT
The Contract shall be signed by the successful Bidder and returned, together with the Contract bonds, within 10 days after the Bidder has received the Contract for execution. 3-1.04 FAILURE TO EXECUTE CONTRACT
The Bidder shall pay to the City of Vallejo from Bidder’s proposal guaranty, such sums as will reimburse the City of Vallejo for costs incurred for failure of the successful Bidder to complete, sign and return in strict compliance with these Contract Documents, if requested to do so, Contractor's Qualification Questionnaire, or enter into a Contract.

The amount of Bidder’s cash, bond, certified check, or cashier's check proposal guaranty shall not be deemed to constitute a penalty or liquidated damages.

The City of Vallejo shall not be precluded by such cash, bond, certified check, or cashier's check from recovering from the defaulting Bidder damages in excess of the amount of said cash, bond, certified check, or cashier's check incurred as a result of the failure of the successful Bidder to complete, sign and return in strict compliance with these Contract Documents, if requested to do so, Contractor's Qualification Questionnaire, or enter into a Contract. 3-1.05 RETURN OF PROPOSAL GUARANTIES
The proposal guaranties accompanying the proposals of the first, second and third lowest bidders will be retained until the Contract has been finally executed, after which those proposal guaranties, may be returned to the respective bidders whose proposals they accompany. The proposal guaranties, other than Bidder's bonds, submitted by all other unsuccessful bidders will be returned upon determination, by the City of Vallejo, of the first, second and third lowest responsible Bidders.

END OF SECTION

Page 775 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 65 of 192 Cape Seal 2025 Project No. MP2025
SECTION 4: SCOPE OF WORK
4-1.01 INTENT OF PLANS AND SPECIFICATIONS
All work and materials shall be in full accordance with the latest adopted standards and regulations of the State Fire Marshal; the California Building Code; Title 24 of the California Code of Regulations; the California Electrical Code; the California Plumbing Code; Americans with Disabilities Act; and all other applicable codes, laws, rules or regulations. Nothing in these Contract Documents is to be construed to permit work not conforming to these requirements. Contractor agrees that immediately upon signing of the Contract, Contractor will diligently review the Contract Documents and determine if any work described or inferred within the Contract Documents is not in conformance with these requirements. Should Contractor discover work within the Contract Documents not in conformance with these requirements, Contractor agrees to immediately notify Engineer in writing of said nonconformance, and to not proceed with nonconforming work. When the work detailed in the Contract Documents differs from governing codes, it is understood and agreed that the Contract sum is based upon the more costly or expensive standard.

The intent of the drawings and Specifications is to prescribe the details for the construction and completion of the work which the Contractor undertakes to perform in accordance with the terms of the Contract, and that the work performed under the Contract results in a complete operating system in satisfactory working condition with respect to the functional purposes of the installation, and no extra compensation will be allowed for anything omitted but fairly implied. The prices paid for the various items in the proposal shall include full compensation for furnishing all labor, materials, tools, equipment, overhead, profit, incidentals, and doing all work necessary to complete the finished product as provided in the Contract Documents. Where the drawings or Specifications describe portions of the work in general terms, but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the highest quality are to be used. The Contractor shall furnish all labor, materials, tools, equipment, and incidentals, and do all the work involved in executing the Contract to the highest possible standard of workmanship.

Should it appear that the work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained in the Contract Documents, or in the event of any doubt or question arising respecting the true meaning of the Contract Documents, the Contractor shall apply to the Engineer in writing for such further explanations as may be necessary, and the Engineer shall render his or her decisions thereon. The Contractor shall thoroughly review all Requests for Information (RFI's) submitted by subcontractors prior to submission to the Engineer to determine whether such RFI's is already answered in the Contract Documents. Contractor represents to City of Vallejo, that by submission of an RFI, Contractor has thoroughly reviewed the RFI and thoroughly reviewed the Contract Documents and determined that the RFI is not answered or reasonably inferable in the Contract Documents, and that the RFI pertains to an unforeseen condition or circumstance that is not described in the Contract Documents, that there is a conflict or discrepancy in the Contract Documents, or there is an omission in the Contract Documents. In the event any RFI is answered or reasonably inferable from the Contract Documents, Contractor agrees to pay the City of Vallejo the reasonable cost, time and expenses associated with reviewing and responding to RFI's which are already answered or reasonably inferable from the Contract Documents. In the event of a disagreement over such compensation, the judgment of the Engineer shall be final.
4-1.02 FINAL CLEANING UP
Before final inspection of the work, the Contractor shall clean the project site, material sites and all ground occupied by the Contractor in connection with the work of all rubbish, excess materials, falsework, temporary structures and equipment in compliance with Caltrans Standard Specification 4-1.13. All parts of the work shall be left in a neat and presentable condition. Full compensation for final cleaning up will be considered as included in the prices paid for the various Contract items of work and no separate payment will be made therefore.

Page 776 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 66 of 192 Cape Seal 2025 Project No. MP2025
4 -1.03 CHANGES
The City reserves the right without changing the scope of work, to make such alterations deviations, additions to or deletions from the drawings and Specifications, including but not limited to, the right to add or delete any portion of the work to be done with no additional compensation or change in lump sum or bid Unit Prices. The City also reserves the right without changing the scope of work, to increase or decrease the quantity of any item or portion of the work, as may be deemed by the Engineer to be necessary or advisable and to require such extra work as may be determined by the Engineer to be required for the proper completion or construction of the whole work contemplated. Such increases or decreases in quantities shall not be a basis for change in character of the work.

The City of Vallejo may request that Contractor provide City of Vallejo with estimated costs for proposed changes to the work. Contractor agrees to promptly provide City of Vallejo with detailed, itemized costs for proposed changes to the work and scheduling data demonstrating the impact, if any, of the proposed changes to the work and the time for completion. Adjustments, if any, in the amount to be paid the Contractor by reason of any modifications of the work as set forth in a Contract Change Order, Construction Change Directive, or arising from claims shall be determined by one or more of the following methods as elected by the City of Vallejo:

A. Lump Sum Price - By an acceptable lump sum price fixed in agreement between the City of Vallejo and the Contractor.

B. Unit Prices – By unit prices fixed by agreement between the City of Vallejo and the Contractor.

C. Force Account - By directing the Contractor to proceed with the work and to keep and present in such form as the City of Vallejo may direct, a correct account of the cost of the change, together with all vouchers therefore. The Contractor will be paid for labor, materials, equipment rental, etc. actually used on change order work performed under Force Account as per Section 9-1.03 of these specifications.

The amount of payment agreed upon or, in the absence of agreement, selected by the City of Vallejo shall be set forth in the change order or construction change directive.

Upon receipt of a Contract Change Order authorized by the Engineer, the Contractor shall proceed with the ordered work. If ordered in writing by the Engineer, the Contractor shall proceed with the work so ordered prior to actual receipt of an authorized Contract Change Order therefore. In those cases, the Engineer will, as soon as practicable, issue a Contract Change Order for the ordered work and the provisions in Section 4-1.03A, "Procedure and Protest," shall be fully applicable to the subsequently issued Contract Change Order.

When the compensation for an item of work is subject to adjustment under the provisions of Section 4-1.03, the Contractor shall, upon request, furnish the Engineer with adequate detailed cost data for that item of work.

If the Contractor requests an adjustment in compensation for an item of work, the cost data shall be submitted with the request.
4-1.03A PROCEDURE AND PROTEST
A Contract Change Order authorized by the Engineer may be issued to the Contractor at any time. Should the Contractor disagree with any terms or conditions set forth in an authorized Contract Change Order not executed by the Contractor, the Contractor shall submit a written protest to the Engineer within 15 days after the receipt of the Contract Change Order. The protest shall state the points of disagreement, and the Contract

Page 777 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 67 of 192 Cape Seal 2025 Project No. MP2025
specification references, quantities and costs involved. If a written protest is not submitted, payment will be made as set forth in the Contract Change Order, and Contractor agrees that payment shall constitute full compensation for all work included therein or required thereby. Unprotested Contract Change Orders will be considered as executed Contract Change Orders.

Where the protest concerning an authorized Contract Change Order relates to compensation, the compensation payable for all work specified or required by that Contract Change Order to which the protest relates will be determined as provided in Section 4-1.03D. The Contractor shall keep full and complete records of the cost of that work and shall permit the Engineer to have access thereto as may be necessary to assist in the determination of the compensation payable for that work.

Where the protest concerning an accepted Contract Change Order relates to the adjustment of Contract time for the completion of the work, the time to be allowed therefor will be determined as provided in Section 8-1.07, "Liquidated Damages."
4-1.03B CHANGE ORDERS
Proposed Contract Change Orders may be presented to the Contractor for consideration prior to authorization by the Engineer. If the Contractor signifies acceptance of the terms and conditions of the proposed Contract Change Order by executing the document and if the Contract Change Order is accepted by the Engineer and issued to the Contractor, payment in accordance with the provisions as to compensation therein set forth shall constitute full compensation for all work included therein or required thereby. An accepted Contract Change Order shall supersede a proposed, but unaccepted, Contract Change Order covering the same work.

The Engineer may provide for an adjustment of compensation as to a Contract item of work included in a Contract Change Order determined as provided in Section 4-1.03D if that item of work is eligible for an adjustment of compensation thereunder.

Contract Change orders shall be in the form provided by City of Vallejo in the Contract Documents. 4-1.03C (NOT USED)
4-1.03D EXTRA WORK
New and unforeseen work will be classed as extra work when determined by the Engineer that the work is not covered by any of the various items for which there is a Unit Price or by combinations of those items. In the event portions of this work are determined by the Engineer to be covered by some of the various items for which there is a bid price or combinations of those items, the remaining portion of the work will be classed as extra work. Extra work also includes work specifically designated as extra work in the drawings or Specifications.

The Contractor shall do the extra work and furnish all labor, material, and equipment therefor upon receipt of an accepted Contract Change Order or other written order of the Engineer, and in the absence of an accepted Contract Change Order or other written order of the Engineer the Contractor shall not be entitled to payment for the extra work.

Payment for extra work required to be performed pursuant to the provisions in this Section 4-1.03D, in the absence of an executed Contract Change Order, will be made by force account as provided in Section 9-1.03; or as agreed to by the Contractor and the Engineer.

Page 778 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 68 of 192 Cape Seal 2025 Project No. MP2025

END OF SECTION

Page 779 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 69 of 192 Cape Seal 2025 Project No. MP2025
SECTION 5: CONTROL OF WORK
5-1.01 AUTHORITY OF ENGINEER
The Engineer shall decide all questions which may arise as to the quality or acceptability of materials furnished and work performed and as to the manner of performance and rate of progress of the work; all questions which may arise as to the interpretation of the drawings and Specifications; all questions as to the acceptable fulfillment of the Contract on the part of the Contractor; and all questions as to compensation. The Engineer's decision shall be final, and the Engineer shall have authority to enforce and make effective those decisions and orders which the Contractor fails to carry out promptly. 5-1.02 CONTRACT DRAWINGS AND WORKING DRAWINGS
The Contract drawings (City-approved Plans) furnished consist of general drawings and show such details as are necessary to give a comprehensive idea of the construction contemplated. All authorized alterations affecting the requirements and information given on the Contract drawings shall be in writing.

The Contract drawings shall be supplemented by such working drawings prepared by the Contractor as are necessary to adequately control perform the work. No change shall be made by the Contractor to any working drawing after it has been accepted by the Engineer.

Working drawings for any part of the permanent work shall include, but not be limited to anchor bolt layouts, shop details, erection drawings, equipment lists, and any other information specifically required elsewhere in the Specifications.

Working drawings for falsework, temporary support systems, form work and for other temporary work and methods of construction the Contractor proposes to use, shall be submitted when required by the Contract Documents or ordered by the Engineer. Working drawings shall be subject to City of Vallejo review insofar as the details affect the character of the finished work and for compliance with design requirements applicable to the construction when specified or called for, but details of design will be left to the Contractor who shall be responsible for the successful construction of the work.

Working drawings shall be reviewed by the Engineer before any work involving the drawings is performed. It is expressly understood that review of the Contractor's working drawings shall not relieve the Contractor of any responsibility under the Contract for the successful completion of the work in conformity with the requirements of the drawings and Specifications. Review of working drawings shall not operate to waive any of the requirements of the drawings and Specifications or relieve the Contractor of any obligation thereunder, and defective work, materials and equipment may be rejected notwithstanding the review.

Full compensation for furnishing all working drawings shall be considered as included in the prices paid for the Contract items of work to which the drawings relate, and no additional compensation will be allowed therefor. 5-1.02A TRENCH EXCAVATION SAFETY PLANS
Attention is directed to Section 7-1.01E, "Trench Safety." Excavation for any trench 1.5 m {5 feet} or more in depth shall not begin until the Contractor has prepared detailed plans for worker protection from the hazards of caving ground during the excavation of that trench. The detailed plan shall show the details of the design of shoring, bracing, sloping or other provisions to be made for worker protection during the excavation. No plan shall allow the use of shoring, sloping or a protective system less effective than that required by the

Page 780 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 70 of 192 Cape Seal 2025 Project No. MP2025
Construction Safety Orders of the Division of Occupational Safety and Health. If the plan complies with the shoring system standards established by the Construction Safety Orders, the plan shall be submitted at least 5 days before the Contractor intends to begin excavation for the trench. If the plan varies from the shoring system standards established by the Construction Safety Orders, the plan shall be prepared and signed by an engineer who is registered as a Civil Engineer in the State of California, and the plan and design calculations shall be submitted at least 3 weeks before the Contractor intends to begin excavation for the trench. 5-1.03 CONFORMITY WITH CONTRACT DOCUMENTS AND ALLOWABLE

DEVIATIONS
Contractor work and materials shall strictly conform to the lines, grades, typical cross sections, dimensions, and material requirements, including tolerances, required in the Contract Documents. Although measurement, sampling and testing may be considered evidence as to conformity, the Engineer shall be the sole judge as to whether the work or materials deviate from the drawings and Specifications, and the Engineer's decision as to any allowable deviations therefrom shall be final.
5-1.04 COORDINATION AND INTERPRETATION OF PLANS, SPECIFICATIONS AND

STANDARD SPECIFICATIONS
These project drawings, specifications, Special Provisions, Contract Change Orders and all supplementary documents are essential parts of the Contract, and a requirement occurring in one Contract Document is as binding as though occurring in all. They are intended to be complementary, and to describe and provide a complete work.

In the event of a conflict between the project drawings, Specifications or special provisions, and Standard Plans and Standard, Specifications of the State of California, Business, Transportation and Housing Agency, Department of Transportation, 2022 edition, City of Vallejo Standard Specifications and Standard Plans, December 2011 edition, or Vallejo Sanitation & Flood Control District Master Bid Document, dated March 2007, the project drawings, and Specifications shall control. Project drawings shall govern over Standard Plans; Standard Plans and project drawings shall govern over the Standard Specifications; and the special provisions shall govern over both the Standard Specifications and the project drawings. The specific shall control over the general.

Should it appear that the work to be done or any of the matters relative thereto are not sufficiently detailed or explained in the Contract Documents, the Contractor shall apply in writing to the Engineer for such further explanations as may be necessary and shall conform to them as part of the Contract. In the event of any doubt or question arising respecting the true meaning of the Contract Documents, reference in writing shall be made to the Engineer, whose decision thereon shall be final.

In the event of any discrepancy between any drawing and the figures written thereon, the figures shall be taken as correct. Detail drawings shall prevail over general drawings. 5-1.05A ORDER OF WORK
When required by the Contract Documents, the Contractor shall follow the sequence of operations as set forth therein.

Full compensation for conforming to those requirements will be considered as included in the prices paid for the various Contract items of work and no additional compensation will be allowed therefor.

Page 781 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 71 of 192 Cape Seal 2025 Project No. MP2025
5-1.05B HOURS OF WORK
Regular working hours are 8:00 a.m. to 5:00 p.m., Monday through Friday, excluding holidays observed by the City. For work to be completed within the State Right of Way, regular working hours are 7:00 p.m. to 7:00 a.m.

No work outside of the regular working hours shall be done unless previously requested by the Contractor in writing and approved by the Engineer in writing. The contractor is subject to reimbursing the City for the costs of providing inspection outside of regular working hours.

The order of streets to be surface sealed shall be determined be the contractor per the plans listed on Appendix B. No work shall take place on garbage collection days. See table on Appendix C for Recology garbage collection schedule.
5-1.06 SUPERINTENDENCE
The Contractor shall designate in writing before starting work an authorized representative who shall act as Superintendent and have the authority to represent and act for the Contractor. The Superintendent shall have responsibility for overall project operations and shall not be a “working foreman.” When the Contractor is comprised of 2 or more persons, firms, partnerships, or corporations functioning on a joint venture basis, the Contractor shall designate in writing before starting work, the name of one authorized representative who shall serve as the Superintendent, and who shall have the authority to represent and act for the Contractor.

The Superintendent shall be always present at the site of the work while work is in progress on the Contract.

When work is not in progress and during periods when work is suspended, arrangements acceptable to the Engineer shall be made for any emergency work which may be required.

Whenever the Contractor or the Contractor's Superintendent is not present on any part of the work where it may be desired to give direction, orders will be given by the Engineer, which shall be received and obeyed by the foreman or other individual who may have charge of the particular work in reference to which the orders are given.

Any order given by the Engineer, not otherwise required by the Specifications to be in writing, will on request of the Contractor, be given or confirmed by the Engineer in writing. 5-1.07 LINES AND GRADES
Stakes or marks for horizontal and vertical control will be set by the Engineer as the Engineer determines to be necessary to establish the lines and grades required for the completion of the work specified in these Contract Documents.

When the Contractor requires the stakes or marks, the Contractor shall notify the Engineer of the requirements in writing a reasonable length of time in advance of starting operations that require the stakes or marks. In no event shall a notice of less than 2 working days be considered a reasonable length of time.

Stakes and marks set by the Engineer shall be carefully preserved by the Contractor. In case the stakes and marks are destroyed or damaged, the Contractor will be charged for the cost of necessary replacement or restoration of stakes and marks. This charge will be deducted from any moneys due or to become due the

Page 782 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 72 of 192 Cape Seal 2025 Project No. MP2025
Contractor.
5-1.08 INSPECTION
The Engineer shall at all times have safe access to the work during its construction and shall be furnished with every reasonable facility for ascertaining that the materials and the workmanship are in accordance with the requirements and intentions of the Contract Documents. All work done and all materials furnished shall be subject to the Engineer's inspection.

Neither the inspection by an inspector, City of Vallejo, Engineer, nor any measurement, approved or unapproved modification, submittals, shop drawing, order, or certificate, nor acceptance of any part or whole of the work, or payment of money, nor any possession or use by the City of Vallejo or its agents, shall operate as a waiver of any provisions of the Contract or of any power or authority reserved therein, or of any right to damages thereunder; nor shall the waiver of any breach of this Contract be held to be a waiver of any subsequent or other breach.

Projects financed in whole or in part with State or Federal funds shall at all times be subject to inspection by the State or Federal agency involved, or their authorized representative. 5-1.09 REMOVAL OF REJECTED AND UNAUTHORIZED WORK
All work which has been rejected shall be remedied or removed and replaced by the Contractor in a manner acceptable to the Engineer, and no compensation will be allowed to the Contractor for the removal, replacement or remedial work.

Any work done beyond the lines and grades shown on the drawings or established by the Engineer, or any extra work done without written authority will be considered as unauthorized work and will not be paid for.

Upon order of the Engineer unauthorized work shall be remedied, removed, or replaced at the Contractor's expense.

Upon failure of the Contractor to comply promptly with any order of the Engineer made under this Section 5-

1.09, the City of Vallejo may cause rejected or unauthorized work to be remedied, removed, or replaced, and to deduct the costs from any moneys due or to become due the Contractor. 5-1.10 EQUIPMENT AND PLANTS
Only equipment suitable to produce the quality of work and materials required will be permitted to operate on the project.

The Contractor shall provide adequate and suitable equipment and plants to meet the above requirements, and when ordered by the Engineer shall remove unsuitable equipment from the work and discontinue the operation of unsatisfactory plants.

The Contractor shall identify each piece of equipment, other than hand tools, by means of an identifying number plainly stenciled or stamped on the equipment at a conspicuous location and shall furnish to the Engineer a list giving the description of each piece of equipment and its identifying number.

Page 783 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 73 of 192 Cape Seal 2025 Project No. MP2025
5-1.11 ALTERNATIVE EQUIPMENT
While certain of the Contract Documents may provide that equipment of a particular size and type is to be used to perform portions of the work, it is to be understood that the development and use of new or improved equipment is to be encouraged.

The Contractor may request, in writing, permission from the Engineer to use equipment of a different size or type in place of the equipment specified.

The Engineer, before considering or granting the request, may require the Contractor to furnish, at the Contractor's expense, evidence satisfactory to the Engineer that the equipment proposed for use by the Contractor is capable of producing work equal to, or better than, that which can be produced by the equipment specified.

If permission is granted by the Engineer, it shall be understood that the permission is granted for the purpose of testing the quality of work produced by the equipment and is subject to continuous attainment of results which, in the opinion of the Engineer, are equal to, or better than, that which can be obtained with the equipment specified. The Engineer shall have the right to withdraw permission at any time that the Engineer determines that the alternative equipment is not producing work that is equal, in all respects, to that which can be produced by the equipment specified. Upon withdrawal of permission by the Engineer, the Contractor will be required to use the equipment originally specified and shall, in accordance with the directions of the Engineer, remove and dispose of or otherwise remedy, at the Contractor's expense, any defective or unsatisfactory work produced with the alternative equipment.

The Contractor shall not have any claim against the City of Vallejo for either the withholding or the granting of permission to use alternative equipment, or for the withdrawal of the permission.

Permission to use alternative equipment in place of equipment specified will only be granted where the equipment is new or improved and its use is deemed by the Engineer to be in furtherance of the purposes of this Section 5-1.11. Permission for use of particular equipment on any project shall in no way be considered as permission of the use of the equipment on any other project.

Nothing in this Section 5-1.11 shall relieve the Contractor of the responsibility for furnishing materials or producing finished work of the quality specified in the Contract Documents 5-1.12 ALTERNATIVE METHODS OF CONSTRUCTION
Whenever the drawings or Specifications provide that more than one specified method of construction or more than one specified type of material or construction equipment may be used to perform portions of the work and leave the selection of the method of construction or the type of material or equipment to be used up to the Contractor, it is understood that the City of Vallejo does not guarantee that every or any specified method of construction or type of material or equipment can be used successfully throughout all or any part of any project.

It shall be the Contractor's responsibility to select and use the alternative or alternatives which will satisfactorily perform the work under the conditions encountered. In the event some of the alternatives are not feasible or it is necessary to use more than one of the alternatives on any project, full compensation for any additional cost involved shall be considered as included in the Contract price paid for the item of work involved and no additional compensation will be allowed therefor.
5-1.13 DIFFERING SITE CONDITIONS
During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing

Page 784 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 74 of 192 Cape Seal 2025 Project No. MP2025
materially from those indicated in the Contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the Contract, are encountered at the site, the Contractor shall promptly notify the Engineer in writing of the specific differing conditions before they are disturbed and before the affected work is performed.

Upon written notification, the Engineer will investigate the conditions, and if the Engineer determines that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the Contract, an adjustment, excluding loss of anticipated profits, will be made and the Contract modified in writing accordingly. The Engineer will notify the Contractor of the Engineer's determination whether an adjustment of the Contract is warranted.

No Contract adjustment which results in a benefit to the Contractor will be allowed unless the Contractor has provided the required written notice. Contractor agrees that failure to provide written notice to Engineer as required herein, or failure to otherwise abide by this Section, shall be a waiver by Contractor of any claim, demand, compensation or adjustment in the Contract time or working days.

No Contract adjustment will be allowed under the provisions specified in this section for any effects caused on unchanged work.

Any Contract adjustment warranted due to differing site conditions will be made in conformance with the provisions in Section 4-1.03, "Changes," except as otherwise provided. 5-1.14 CHARACTER OF WORKERS
If any subcontractor or person employed by the Contractor shall appear to the Engineer to be incompetent or to act in a disorderly or improper manner, they shall be discharged immediately on the request of the Engineer, and that person shall not again be employed on the work. 5-1.15 FINAL INSPECTION
When the work has been completed, the Engineer will make the final inspection. 5-1.16 MEANS AND METHODS
City of Vallejo will not have control over, oversee, nor be responsible for construction means, methods, techniques, sequences, or procedures, or for the safety precautions and programs in connection with the work, since these are solely Contractor's responsibility.

The City of Vallejo may perform other work adjacent to or within the project area, concurrent with the Contractor's operations. The Contractor shall cooperate fully with City of Vallejo in all operations which coincide with other work being performed and provide City of Vallejo with such scheduling and other information as may be required by City of Vallejo to perform such other work. The Contractor shall conduct operations to minimize interference with the work of other forces or contractors performing such work. This work performed by a second contractor may include work which is incomplete or in dispute with the Contractor.

Any disputes or conflicts which may arise between the Contractor and any other forces or contractors retained by the City of Vallejo, causing delays or hindrance to each other, shall be referred to the Engineer for resolution.

The City of Vallejo shall have the right at any time during the progress of this work to take over and place in service any completed or partially completed portion of the work, notwithstanding the time for completion of

Page 785 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 75 of 192 Cape Seal 2025 Project No. MP2025
the entire work or such portions which may not have expired; but such taking possession thereof shall not be deemed an acceptance of any of the work, nor work on those portions not completed in accordance with the Contract Documents.

END OF SECTION

Page 786 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 76 of 192 Cape Seal 2025 Project No. MP2025
SECTION 6: CONTROL OF MATERIALS
6-1 GENERAL
6-1.01 SOURCE OF SUPPLY AND QUALITY OF MATERIALS
The Contractor shall furnish all materials required to complete the work, except materials that are designated in the Specifications to be furnished by the City of Vallejo and materials furnished by the City of Vallejo in conformance with the provisions in Section 9-1.03, "Force Account Payment." Only materials conforming to the requirements of the Contract Documents shall be incorporated in the work.

The materials furnished and used shall be new, except as may be provided elsewhere in the Contract Documents. The materials shall be manufactured, handled and used in a workmanlike manner to ensure completed work in accordance with the drawings and Specifications.

Materials to be used in the work will be subject to inspection and tests by the Engineer or the Engineer's designated representative. The Contractor shall furnish without charge such samples as may be required.

The Contractor shall furnish the Engineer a list of the Contractor's sources of materials and the locations at which those materials will be available for inspection. The list shall be submitted on a form acceptable to the Engineer and shall be furnished to the Engineer in sufficient time to permit inspecting and testing of materials to be furnished to the listed sources in advance of their use. The Engineer may inspect, sample or test materials at the source of supply or other locations, but the inspection, sampling or testing will not be undertaken until the Engineer is assured by the Contractor of the cooperation and assistance of both the Contractor and the supplier of the material. The Contractor shall assure that the Engineer or the Engineer's authorized representative has free access at all times to the material to be inspected, sampled or tested. It is understood that the inspections and tests if made at any point other than the point of incorporation in the work in no way shall be considered as a guaranty of acceptance of the material nor of continued acceptance of material presumed to be similar to that upon which inspections and tests have been made, and that inspection and testing performed by the City of Vallejo shall not relieve the Contractor or the Contractor's suppliers of responsibility for quality control.

Manufacturers' warranties, guaranties, instruction sheets and parts lists, which are furnished with certain articles or materials incorporated in the work, shall be delivered to the Engineer before acceptance of the Contract.

Reports and records of inspections made, and tests performed, when available at the site of the work, may be examined by the Contractor.
6-1.02 CITY FURNISHED MATERIALS
Materials which are listed as City of Vallejo-furnished materials in the special provisions will be available to the Contractor free of charge.

The Contractor shall submit a written request to the Engineer for the delivery of City of Vallejo-furnished material at least 15 days in advance of the date of its intended use. The request shall state the quantity and the type of each material.

The City of Vallejo-furnished materials will be available to the Contractor free of charge will be designated in

Page 787 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 77 of 192 Cape Seal 2025 Project No. MP2025
the special provisions. In those cases the materials shall be hauled to the site of the work by the Contractor at the Contractor's expense, including any necessary loading and unloading that may be involved. All costs of handling and placing City of Vallejo-furnished material shall be considered as included in the price paid for the Contract item involving the City of Vallejo-furnished material.

The Contractor shall be responsible for all City of Vallejo-furnished materials furnished to the Contractor, and shall pay all demurrage and storage charges. City of Vallejo-furnished materials lost or damaged from any cause whatsoever shall be replaced by the Contractor at the Contractor's expense. The Contractor shall be liable to the City of Vallejo for the cost of replacing City of Vallejo-furnished material, and those costs may be deducted from any moneys due or to become due the Contractor. All City of Vallejo-furnished material that is not used on the work shall remain the property of the City of Vallejo and shall be delivered to the Engineer’s designated location at no cost to the City.
6-1.03 STORAGE OF MATERIALS
Articles or materials to be incorporated in the work shall be stored in such a manner as to ensure the preservation of their quality and fitness for the work, and to facilitate inspection. 6-1.04 DEFECTIVE MATERIALS
All materials which the Engineer has determined do not strictly conform to the requirements of the Contract Documents will be rejected whether in place or not. The rejected materials shall be removed immediately from the site of the work, unless otherwise permitted in writing by the Engineer. No rejected material, the defects of which have been subsequently corrected, shall be used in the work, unless authorization in writing has been given by the Engineer. Upon failure of the Contractor to comply promptly with any order of the Engineer made under the provisions in this section, the Engineer shall have authority to cause the removal and replacement of rejected material and to deduct the cost thereof from any moneys due or to become due the Contractor.

If nonconforming work, materials, or equipment not meeting the requirements and intent of the Contract Documents is discovered, and the Contractor fails to remedy the nonconforming work, materials, or equipment, or the City of Vallejo agrees in writing to accept the nonconforming work, materials, or equipment, Contractor agrees to sign a Contract Change Order or otherwise reimburse City of Vallejo in a sum equal to the cost to remedy the nonconforming work, materials, or equipment. It is expressly understood and agreed that the City of Vallejo will be entitled to recover from Contractor the full cost of remedying nonconforming work, materials, or equipment, and that diminution in value will not be considered as a method for valuing the City of Vallejo's damages for nonconforming work, materials, or equipment, and further that the doctrine of economic waste will not be a defense to the City of Vallejo's recovery from Contractor of the full and complete cost and expense of remedying nonconforming work, materials, or equipment.

Re-examination of any work may be ordered by the Engineer, and such work must be uncovered by the Contractor. The Contractor shall pay the entire cost of such uncovering, re-examination, and replacement if the work does not conform to the Contract Documents.
6-1.05 TRADE NAMES AND ALTERNATIVES
For convenience in designation on the Contract Documents, certain articles or materials to be incorporated in the work may be designated under a trade name or the name of a manufacturer and the manufacturer's catalogue information. The use of an alternative article or material which is of equal or superior quality and of the required characteristics for the purpose intended will be permitted, subject to the following requirements:

Page 788 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 78 of 192 Cape Seal 2025 Project No. MP2025
The burden of proof as to the quality and suitability of alternatives shall be upon the Contractor, and the Contractor shall furnish all information necessary as required by the Engineer. The Engineer shall be the sole judge as to the quality and suitability of alternative articles or materials, and the Engineer's decision shall be final.

Whenever the Contract Documents permit the substitution of a similar or equivalent material or article, no tests or action relating to the acceptance of the substitute material will be made until the request for substitution is made in writing by the Contractor accompanied by complete data as to the equality of the material or article proposed. Request for such substitution shall be made in writing by the Contractor within thirty (30) days of the Notice to Proceed. Failure by the Contractor to request substitution within thirty (30) days of the Notice to Proceed constitutes an agreement by Contractor to furnish only the materials or equipment listed in the Contract Documents. Until and unless such substitutions are authorized in writing by the Engineer, no deviations from the specifications shall be allowed.
6-1.06 PLANT INSPECTION
The Engineer may inspect the production of material or the manufacture of products at the source of supply.

Plant inspection, however, will not be undertaken until the Engineer is assured of the cooperation and assistance of both the Contractor and the material producer. The Engineer or the Engineer's authorized representative shall have free entry at all times to those parts of the plant as concerns the manufacture or production of the materials. Adequate facilities shall be furnished free of charge to make the necessary inspection. The City of Vallejo assumes no obligation to inspect materials at the source of supply. 6-1.07 CERTIFICATES OF COMPLIANCE
A Certificate of Compliance shall be furnished prior to the use of any materials for which the Contract Documents require that a certificate be furnished. In addition, when so authorized in the Contract Documents, the Engineer may permit the use of certain materials or assemblies prior to sampling and testing if accompanied by a Certificate of Compliance. The certificate shall be signed by the manufacturer of the material or the manufacturer of assembled materials and shall state that the materials involved comply in all respects with the requirements of the Contract Documents. A Certificate of Compliance shall be furnished with each lot of material delivered to the work and the lot so certified shall be clearly identified in the certificate.

Materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. The fact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating material in the work which conforms to the requirements of the Contract Documents, and any material not conforming to the requirements will be subject to rejection whether in place or not.

The City of Vallejo reserves the right to refuse to permit the use of material on the basis of a Certificate of Compliance.

The form of the Certificate of Compliance and its disposition shall be as directed by the Engineer. 6-1.08 FOREIGN MATERIALS
Materials which are manufactured, produced or fabricated outside of the United States shall be delivered to a distribution point in California, unless otherwise required in the Contract Documents, where they shall be

Page 789 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 79 of 192 Cape Seal 2025 Project No. MP2025
retained for a sufficient period of time to permit inspection, sampling and testing.

Attention is directed to the provisions in Section 8-1.07, "Liquidated Damages." The Contractor shall not be entitled to an extension of time for acts or events occurring outside of the United States, and it shall be the Contractor's responsibility to deliver materials obtained from outside of the United States to the point of entry into the continental United States in sufficient time to permit timely delivery to the job site.

The Contractor, at no cost to the City of Vallejo, shall supply the facilities and arrange for any testing required in California which the City of Vallejo is not equipped to perform. All testing by the Contractor shall be subject to witnessing by the Engineer.

The manufacturer, producer or fabricator of foreign material shall furnish to the Engineer a Certificate of Compliance in conformance with the provisions in Section 6-1.07, "Certificates of Compliance." In addition, certified mill test reports clearly identifiable to the lot of material shall be furnished where required in the Contract Documents or otherwise requested by the Engineer.

If the welding of steel for structural steel members or the casting and prestressing of precast, prestressed concrete members is to be performed outside of the United States, the following requirements shall apply:

A. The fabrication shall be performed only within the plants and by fabricators who have previously established, to the satisfaction of the Engineer, that they have the experience, knowledge, trained manpower, quality controls, equipment and other facilities required to produce the quality and quantity of work required. At the option of the Engineer, prequalification of the plant and fabricator will be established either by the submission of detailed written proof thereof or through in-plant inspection by the Engineer or the Engineer's representative, or both.

B. The Contractor shall make written application to the Engineer for acceptance for the foreign fabrication at the earliest possible time and in no case later than 50 days in advance of the planned start of fabrication. The application shall list the specific units or portion of a work which will be fabricated outside of the United States.

C. The Contractor shall advise the Engineer, in writing, at least 20 days in advance of the actual start of any of the foreign fabrication.

D. All documents pertaining to the Contract, including but not limited to, correspondence, bid documents, working drawings and data shall be written in the English language and all numerical data shall use the International System of Units (SI) {United States Standard Measures} for measurement.

The use of steel manufactured outside of the United States as unidentified stock material, as provided in Section 55-2.07, "Unidentified Stock Material," will not be allowed.

END OF SECTION

Page 790 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 80 of 192 Cape Seal 2025 Project No. MP2025
SECTION 7: LEGAL RELATIONS AND RESPONSIBILITY
7-1.01 LAWS TO BE OBSERVED
The Contractor shall keep fully informed of all existing and future laws, ordinances and regulations which in any manner affect those engaged or employed in the work, or the materials used in the work, or which in any way affect the conduct of the work, and of all orders and decrees of bodies or tribunals having any jurisdiction or authority over the same. The Contractor shall at all times observe and comply with, and shall cause all the Contractor's agents, employees, subcontractors and material suppliers to observe and comply with all existing and future laws, ordinances, regulations, orders and decrees of bodies or tribunals having any jurisdiction or authority over the work; and shall protect and indemnify the City of Vallejo, and all officers and employees thereof connected with the work, including but not limited to the Director and the Engineer, against any claim or liability arising from or based on the violation of any law, ordinance, regulation, order or decree, whether by the Contractor or the Contractor's employees. If any discrepancy or inconsistency is discovered in the Contract Documents for the work in relation to any law, ordinance, regulation, order or decree, each Bidder and the Contractor shall forthwith report the same to the Engineer in writing. 7-1.01A LABOR CODE REQUIREMENTS
Attention is directed to the following requirements of the Labor Code:
7-1.01A (1) HOURS OF LABOR
Eight hours of labor constitutes a legal day's work. The Contractor or any subcontractor under the Contractor shall forfeit, as a penalty to the State of California, $25 for each worker employed in the execution of the Contract by the respective Contractor or subcontractor for each calendar day during which that worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the requirements of the Labor Code, and in particular, Section 1810 to Section 1815, thereof, inclusive, except that work performed by employees of Contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon compensation for all hours worked in excess of 8 hours per day at not less than one and one-half times the basic rate of pay, as provided in Section 1815 thereof. 7-1.01A (2) PREVAILING WAGE
The Contractor and any subcontractor under the Contractor shall comply with Labor Code Sections 1774 and 1775. Pursuant to Section 1775, the Contractor and any subcontractor under the Contractor shall forfeit to the City of Vallejo or political subdivision on whose behalf the Contract is made or awarded a penalty of not more than fifty dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the Director of Industrial Relations for the work or craft in which the worker is employed for any public work done under the Contract by the Contractor or by any subcontractor under the Contractor in violation of the requirements of the Labor Code and in particular, Labor Code Sections 1770 to 1780, inclusive.

The amount of this forfeiture shall be determined by the Labor Commissioner and shall be based on consideration of the mistake, inadvertence, or neglect of the Contractor or subcontractor in failing to pay the correct rate of prevailing wages, or the previous record of the Contractor or subcontractor in meeting their respective prevailing wage obligations, or the willful failure by the Contractor or subcontractor to pay the correct rates of prevailing wages. A mistake, inadvertence, or neglect in failing to pay the correct rate of prevailing wages is not excusable if the Contractor or subcontractor had knowledge of the obligations under the Labor

Page 791 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 81 of 192 Cape Seal 2025 Project No. MP2025
Code. In addition to the penalty and pursuant to Labor Code Section 1775, the difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the Contractor or subcontractor. If a worker employed by a subcontractor on a public works project is not paid the general prevailing per diem wages by the subcontractor, the prime Contractor of the project is not liable for the penalties described above unless the prime Contractor had knowledge of that failure of the subcontractor to pay the specified prevailing rate of wages to those workers or unless the prime Contractor fails to comply with all of the following requirements:

A. The Contract executed between the Contractor and the subcontractor for the performance of work on the public works project shall include a copy of the requirements in Sections 1771, 1775, 1776, 1777.5, 1813 and 1815 of the Labor Code.

B. The Contractor shall monitor the payment of the specified general prevailing rate of per diem wages by the subcontractor to the employees, by periodic review of the certified payroll records of the subcontractor.

C. Upon becoming aware of the subcontractor's failure to pay the specified prevailing rate of wages to the subcontractor's workers, the Contractor shall diligently take corrective action to halt or rectify the failure, including, but not limited to, retaining sufficient funds due the subcontractor for work performed on the public works project.

D. Prior to making final payment to the subcontractor for work performed on the public works project, the Contractor shall obtain an affidavit signed under penalty of perjury from the subcontractor that the subcontractor has paid the specified general prevailing rate of per diem wages to the subcontractor's employees on the public works project and any amounts due pursuant to Section 1813 of the Labor Code.

Pursuant to Section 1775 of the Labor Code, the Division of Labor Standards Enforcement shall notify the Contractor on a public works project within 15 days of the receipt by the Division of Labor Standards Enforcement of a complaint of the failure of a subcontractor on that public works project to pay workers the general prevailing rate of per diem wages. If the Division of Labor Standards Enforcement determines that employees of a subcontractor were not paid the general prevailing rate of per diem wages and if the City of Vallejo did not retain sufficient money under the Contract to pay those employees the balance of wages owed under the general prevailing rate of per diem wages, the Contractor shall withhold an amount of moneys due the subcontractor sufficient to pay those employees the general prevailing rate of per diem wages if requested by the Division of Labor Standards Enforcement. The Contractor shall pay any money retained from and owed to a subcontractor upon receipt of notification by the Division of Labor Standards Enforcement that the wage complaint has been resolved. If notice of the resolution of the wage complaint has not been received by the Contractor within 180 days of the filing of a valid notice of completion or acceptance of the public works project, whichever occurs later, the Contractor shall pay all moneys retained from the subcontractor to the City of Vallejo. These moneys shall be retained by the City of Vallejo pending the final decision of an enforcement action.

Pursuant to the requirements in Section 1773 of the Labor Code, the City of Vallejo has obtained the general prevailing rate of wages (which rate includes employer payments for health and welfare, pension, vacation, travel time and subsistence pay as provided for in Section 1773.8 of the Labor Code, apprenticeship or other training programs authorized by Section 3093 of the Labor Code, and similar purposes) applicable to the work to be done, for straight time, overtime, Saturday, Sunday and holiday work. The holiday wage rate listed shall be applicable to all holidays recognized in the collective bargaining agreement of the particular craft, classification or type of workmen concerned.

General prevailing wage rates are also available from the California State Department of Industrial Relations' Internet Web Site at:

Page 792 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 82 of 192 Cape Seal 2025 Project No. MP2025
http://www.dir.ca.gov/OPRL/dprewagedetermination.htm
The wage rates determined by the Director of Industrial Relations for the project refer to expiration dates.

Prevailing wage determinations with a single asterisk after the expiration date are in effect on the date of advertisement for bids and are good for the life of the Contract. Prevailing wage determinations with double asterisks after the expiration date indicate that the wage rate to be paid for work performed after this date has been determined. If work is to extend past this date, the new rate shall be paid and incorporated in the Contract.

The Contractor shall contact the Department of Industrial Relations as indicated in the wage rate determinations to obtain predetermined wage changes.

Pursuant to Section 1773.2 of the Labor Code, general prevailing wage rates shall be posted by the Contractor at a prominent place at the site of the work.

Changes in general prevailing wage determinations which conform to Labor Code Section 1773.6 and Title 8 California Code of Regulations Section 16204 shall apply to the project when issued by the Director of Industrial Relations at least 10 days prior to the date of the Notice to Contractors for the project.

The City of Vallejo will not recognize any claim for additional compensation because of the payment by the Contractor of any wage rate in excess of the prevailing wage rate set forth in the Contract. The possibility of wage increases is one of the elements to be considered by the Contractor in determining the bid and will not under any circumstances be considered as the basis of a claim against the City of Vallejo on the Contract by Contractor.
7-1.01A(2)(A) TRAVEL AND SUBSISTENCE PAYMENTS
Attention is directed to the requirements in Section 1773.8 of the Labor Code. The Contractor shall make travel and subsistence payments to each workman, needed to execute the work, in conformance with the requirements in Labor Code Section 1773.8.

Full compensation for conforming to the requirement of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed, therefore.
7-1.01A(3) PAYROLL RECORDS
Attention is directed to the requirements in Labor Code Section 1776, a portion of which is quoted below.

Regulations implementing Labor Code Section 1776 are located in Sections 16016 through 16019 and Sections 16207.10 through 16207.19 of Title 8, California Code of Regulations.

A. Each Contractor and subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:

1. The information contained in the payroll record is true and correct.

2. The employer has complied with the requirements of Sections 1771, 1811, and 1815 for any work performed by his or her employees on the public works project.

Page 793 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 83 of 192 Cape Seal 2025 Project No. MP2025
B. The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the Contractor on the following basis:

1. A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request.

2. A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to a representative of the body awarding the Contract, the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards of the Department of Industrial Relations.

3. A certified copy of all payroll records enumerated in subdivision (a) shall be made available upon request by the public for inspection or for copies thereof. However, a request by the public shall be made through either the body awarding the Contract, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the Contractor, subcontractors, and the entity through which the request was made. The public shall not be given access to the records at the principal office of the Contractor.

C. The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the division.

D. A Contractor or subcontractor shall file a certified copy of the records enumerated in subdivision (a) with the entity that requested the records within 10 days after receipt of a written request.

E. Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement shall be marked or obliterated in a manner so as to prevent disclosure of an individual's name, address and social security number. The name and address of the Contractor awarded the Contract or the subcontractor performing the Contract shall not be marked or obliterated.

F. The Contractor shall inform the body awarding the Contract of the location of the records enumerated under subdivision (a), including the street address, city and county, and shall, within five working days, provide a notice of a change of location and address.

G. The Contractor or subcontractor shall have 10 days in which to comply subsequent to receipt of a written notice requesting the records enumerated in subdivision (a). In the event that the Contractor or subcontractor fails to comply within the 10-day period, he or she shall, as a penalty to the state or political subdivision on whose behalf the Contract is made or awarded, forfeit twenty-five dollars ($25) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. A Contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section."
The penalties specified in subdivision (g) of Labor Code Section 1776 for noncompliance with the requirements in Section 1776 may be deducted from any moneys due or which may become due to the Contractor.

All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement). Payrolls shall contain the full name, address and social security number of each employee, the employee's correct classification, rate of pay, daily and weekly number of hours worked, itemized deductions made and actual wages paid. They shall also indicate apprentices and ratio of apprentices to journeymen. The employee's address and social security number need only appear on the first payroll on which that name appears. The payroll shall be accompanied by a "Statement

Page 794 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 84 of 192 Cape Seal 2025 Project No. MP2025
of Compliance" signed by the employer or the employer's agent indicating that the payrolls are correct and complete and that the wage rates contained therein are not less than those required by the Contract. The "Statement of Compliance" shall be on forms furnished by the City of Vallejo or on any form with identical wording. The Contractor shall be responsible for the submission of copies of payrolls of all subcontractors.

If by the 15th of the month, the Contractor has not submitted satisfactory payrolls for all work performed during the monthly period ending on or before the 1st of that month, the City of Vallejo may retain an amount equal to 10 percent of the estimated value of the work performed (exclusive of Mobilization) during the month from the next monthly estimate, except that this retention shall not exceed $10,000 nor be less than $1,000.

Retentions for failure to submit satisfactory payrolls shall be additional to all other retentions provided for in the Contract. The retention for failure to submit payrolls for any monthly period will be released for payment on the monthly estimate for partial payments next following the date that all the satisfactory payrolls for which the retention was made are submitted.

The Contractor and each subcontractor shall preserve their payroll records for a period of 3 years from the date of completion of the Contract.
7-1.01A(4) LABOR NONDISCRIMINATION
Attention is directed to Section 1735 of the Labor Code, which reads as follows:
"No discrimination shall be made in the employment of persons upon public works because of the race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, or sex of such persons, except as provided in Section 12940 of the Government Code, and every Contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter." Attention is directed to the following "Nondiscrimination Clause" that is required by Chapter 5 of Division 4 of Title 2, California Code of Regulations.

NONDISCRIMINATION CLAUSE
“During the performance of this Contract, Contractor and its SUBCONTRACTORS shall not unlawfully discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, physical handicap, medical condition, marital status, age (over 40) or sex. Contractors and SUBCONTRACTORS shall ensure that the evaluation and treatment of their employees and applicants for employment are free of such discrimination. Contractors and SUBCONTRACTORS shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code, Section 12990 et seq.) and the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, and Section 7285.0 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code, Section 12990, set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations are incorporated into this Contract by reference and made a part hereof as if set forth in full. Contractor and its SUBCONTRACTORS shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.” The Contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the Contract.
7-1.01A(5) APPRENTICES
Attention is directed to Sections 1777.5, 1777.6 and 1777.7 of the California Labor Code and Title 8, California Code of Regulations Section 200 et seq. To ensure compliance and complete understanding of the law

Page 795 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 85 of 192 Cape Seal 2025 Project No. MP2025
regarding apprentices, and specifically the required ratio thereunder, each Contractor or subcontractor should, where some question exists, contact the Division of Apprenticeship Standards, 455 Golden Gate Avenue, San Francisco, CA 94102, or one of its branch offices prior to commencement of work on the public works Contract.

Responsibility for compliance with this section lies with the Contractor.

It is City of Vallejo policy to encourage the employment and training of apprentices on public works Contracts as may be permitted under local apprenticeship standards.

A. Only registered apprentices within a written agreement in an approved apprentice-training program providing no less than 2,000 hours of continuous employment and education are eligible for employment on public works (in compliance with Labor Section 3077).

B. A contractor is no longer required to submit Form DAS-7, but must submit award information to the local applicable joint apprenticeship committee. The award information must include:
•an estimate of the journeyman hours;
•the number of apprentices to be employed; and
•the approximate dates of apprentice employment.

C. The minimum statutory 1:5 hourly ratio of work stipulates that no less than one hour of apprentice work for every five hours of journeyman labor on any day of work. (Any journeyman work performed beyond 8 hours per day or 40 hours per week shall not be used to calculate the hourly ratio).

This section shall not apply to specialty contractors or general contractors whose contracts involve less than Thirty Thousand Dollars ($30,000.00) or 20 working days.

The Division of Apprenticeship Standards may grant a certificate exempting the contractor from the minimum 1:5 hourly ratios under any one of the following:

Unemployment exceeds an average of 15% in the area for the previous 3-month period; The number of apprentices in training in such area exceeds a ratio of 1:5; The apprentice able craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either locally or statewide;
The specific task would jeopardize the apprentice's life or public safety or no training can be provided to an apprentice by a journeyman for the specific task.

D. Apprentices employed on public works projects can only be assigned to perform work of the craft or trade to which the apprentice is registered.

E. All contractors with employees in any apprentice able occupation, regardless of the actual employment of journeymen or apprentices for the awarded public work, must either contribute to the local training trust fund or to the California Apprenticeship Council, P.O. Box 603, San Francisco, CA 94101 (as set forth in Section 227).

F. All violations of Section 1777.5 shall pay a civil penalty of Fifty Dollars ($50.00) for each calendar day of noncompliance.

All willful violations of Section 1777.5 shall pay the $50.00 fine for each calendar day of noncompliance and shall be denied the right to bid on, or to receive, any public works contract for a period of up to one year for the first violation and up to three years for any additional violations.

Page 796 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 86 of 192 Cape Seal 2025 Project No. MP2025
Compliance disputes arising under Section 177.5 shall be adjudicated under 8 California Code of Regulations, Article 1.

G. Within five (5) days of a public works contract award, the awarding agency must send a copy of the award to the Division of Apprenticeship Standards under Section 1773.3.

Within five (5) days of finding any discrepancy regarding the hourly ratio of apprentices to journeymen, the awarding agency shall notify the Division of Apprenticeship Standards.

H. The Contractor shall be responsible for compliance for all apprentice able occupations within these sections.
7-1.01A(6) WORKERS' COMPENSATION
Pursuant to the requirements in Section 1860 of the Labor Code, the Contractor will be required to secure the payment of workers' compensation to the Contractor's employees in conformance with the requirements in Section 3700 of the Labor Code.

Prior to the commencement of work, the Contractor shall sign and file with the Engineer a certification in the following form:
"I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract."
This certification is incorporated in the Contract by reference, and signature and return of the Contract as provided in Section 3-1.03, "Execution of Contract," shall constitute signing and filing of the certificate. 7-1.01A(7) SUITS TO RECOVER PENALTIES AND FORFEITURES
Attention is directed to Sections 1730 to 1733, inclusive, of the Labor Code concerning suits to recover amounts withheld from payment for failure to comply with requirements of the Labor Code or Contract provisions based on those laws.

Those sections provide that a suit on the Contract for alleged breach thereof in not making the payment is the exclusive remedy of the Contractor or the Contractor's assignees with reference to amounts withheld for those penalties or forfeitures; and that the suit must be commenced and actual notice thereof received by the awarding authority prior to 90 days after completion of the Contract and the formal acceptance of the job. 7-1.01B FAIR LABOR STANDARDS ACT
The attention of Bidders is invited to the fact that the City of Vallejo has been advised by the Wage and Hour Division, U.S. Department of Labor, that Contractors engaged in highway construction work are required to meet the provisions of the Fair Labor Standards Act of 1938 and as amended (52 Stat. 1060).

Page 797 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 87 of 192 Cape Seal 2025 Project No. MP2025
7-1.01C CONTRACTOR'S LICENSING LAWS
Attention is directed to the provisions of Chapter 9 of Division 3 of the Business and Professions Code concerning the licensing of Contractors. Contractor shall be properly licensed at all times during the performance of the work and performance of the Contract.

All Bidders and Contractors shall be licensed in accordance with the laws of this State and any Bidder or Contractor not so licensed is subject to the penalties imposed by those laws.

Attention is also directed to the requirements in Public Contract Code Section 10164. In all projects where Federal funds are involved, the Contractor shall be properly licensed at the time the Contract is awarded. 7-1.01D VEHICLE CODE
Pursuant to the authority contained in Vehicle Code Section 591, the City of Vallejo has determined that within those areas that are within the limits of the project and are open to public traffic, the Contractor shall comply with all the requirements set forth in Divisions 11, 12, 13, 14 and 15 of the Vehicle Code.

Attention is directed to the statement in Vehicle Code Section 591 that this section shall not relieve the Contractor or any person from the duty of exercising due care. The Contractor shall take all necessary precautions for safe operation of the Contractor's equipment and the protection of the public from injury and damage from the Contractor's equipment.
7-1.01E TRENCH SAFETY
Attention is directed to the requirements in Section 6705 of the Labor Code concerning trench excavation safety plans.

The Contractor is warned that when the work involves existing sewers and appurtenances that have been exposed to sewage and industrial wastes, these facilities shall be considered contaminated with disease- causing organisms. Personnel in contact with contaminated facilities, debris, waste water, or similar items shall be advised by the Contractor of the necessary precautions that must be taken to avoid becoming diseased. It is the Contractor's responsibility to urge his/her personnel to observe a strict regimen of proper hygienic precautions, including any inoculations recommended by the local public health officer.

Because of the potential danger of solvents, gasoline, and other hazardous material in the existing sewers and storm drain pipes, these areas shall be considered hazardous. The Contractor shall be aware of these dangers and shall comply with Article 108, "Confined Spaces," of the General Industrial Safety Orders contained in Title 8 of the California Administrative Code.

In the event that this Contract requires the excavation of any trench or trenches in excess of five feet in depth, Contractor shall prepare a detailed design plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trenches. Said detailed design plan and subsequent excavating operations shall fully comply with all local, state and federal regulations including, but not limited to, the Construction Safety Orders, Section 1539, Permits and Section 1540 et seq., Excavation.
7-1.01F AIR POLLUTION CONTROL

Page 798 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 88 of 192 Cape Seal 2025 Project No. MP2025
The Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes which apply to any work performed pursuant to the Contract, including any air pollution control rules, regulations, ordinances and statutes, specified in Section 11017 of the Government Code.

Unless otherwise provided in the special provisions, material to be disposed of shall not be burned, either inside or outside the highway right of way.
7-1.01G WATER POLLUTION CONTROL
7-1.01G(1) GENERAL
The intent of these requirements is to enforce federal, state, and other local agency regulation prohibiting storm water pollution from construction sites. The storm drain system discharges directly to creeks and the San Francisco Bay without treatment. Therefore, pollutant discharge into the storm drain system is strictly prohibited. Here pollutant discharge means any substance, material, or waste, and discharges NOT permitted under the National Pollutant Discharge Elimination System (NPDES) regulated by the State of California Regional Water Quality Control Board (RWQCB) or the United States Environmental Protection Agency (EPA) other than uncontaminated stormwater.

The Contractor shall conform to all applicable local, state, and Federal regulations and laws pertaining to water pollution control. As applicable, the Contractor shall obtain Water Pollution Control Permits and file all documents including, but not limited to, the State of California Construction General Permit, Stormwater Pollution Prevention Plan. The Contractor shall conduct and schedule operations and follow and implement Best Management Practices (BMPs) in such a manner as to prevent water pollution. The Contractor shall also conform to the following requirements:
1) Sediments shall not be discharged to a storm drain system or receiving waters. In this subsection, the term "storm drain system" shall include storm water conduits, storm drain inlets and other storm drain structures, street gutters and paved surfaces. In this subsection “receiving waters” shall include channels, watercourses, creeks, lakes, the Mare Island Strait, the Carquinez Strait, and the San Francisco Bay.
2) Sediments generated on the Work site shall be contained within the Work site using appropriate BMPs. 3) No construction-related materials, waste, spill, or residue shall be discharged from the Work site to streets, drainage facilities, receiving waters or adjacent property by wind or runoff. 4) Non-storm water runoff from equipment, vehicle washing, or any other activity shall be contained within the Work site using appropriate BMPs.
5) Erosion shall be prevented. Erosion-susceptible slopes shall be covered, planted, or otherwise protected in a way that prevents discharge from the Work site.

In this subsection, the term “storm drain system” shall include water conduits, storm drain inlets and other storm drain structures, street gutters and paved surfaces, channels, watercourses, creek, lakes, the estuary, and the San Francisco Bay.

The Engineer will notify the Contractor of the acceptance or rejection of any submitted or revised water pollution control program.

The City of Vallejo will not be liable to the Contractor for failure to accept all or any portion of an originally

Page 799 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 89 of 192 Cape Seal 2025 Project No. MP2025
submitted or revised water pollution control program, nor for any delays to the work due to the Contractor's failure to submit an acceptable water pollution control program.

Nothing in the terms of the Contract Documents nor in the provisions in this Section 7 1.01G Water Pollution Control shall relieve the Contractor of the responsibility for compliance with Sections 5650 and 12015 of the Fish and Game Code, or other applicable statutes relating to prevention or abatement of water pollution. 7-1.01G(2) BEST MANAGEMENT PRACTICES (BMP)
For the purpose of eliminating stormwater pollution, the Contractor shall implement effective control measures known as Best Management Practices (BMPs). BMPs include schedules of activities, prohibition of practices, general good housekeeping practices, operational practices, pollution prevention practices, maintenance procedures, and other management procedures to prevent pollutant discharge directly or directly into the storm drain system. BMPs also include the construction of some facilities that may be required to prevent, control, and abate stormwater pollution.

The Contractor shall implement and maintain such BMPs as are relevant to the work, and as are specifically required by the project drawings or Specifications. The Contractor shall be responsible throughout the Contract duration for installing, constructing, inspecting, maintaining, removing and disposing of BMPs for wind erosion control, tracking control, erosion and sediment control, non-storm water control, and waste management and materials pollution control. Unless otherwise directed by the Engineer, the Contractor shall be responsible for BMP implementation and maintenance throughout any temporary suspension of the Work. Guidance for appropriate implementation of BMPs can be found in the 7-1.01G(5) Reference Publications, below. 7-1.01G (3) STORM WATER POLLUTION PREVENTION PLAN (SWPPP) When so specified in the Specifications, or if required by a jurisdictional regulatory agency, the Contractor shall prepare and submit a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP shall conform to the requirements specified in the Specifications and those of the jurisdictional regulatory agency. The Notice of Intent will be filed by the City.
7-1.01G(4) DEWATERING
Dewatering shall be performed by the Contractor when specifically required by the project drawings or Specifications, and as necessary for construction of the Work. Dewatering shall be performed in conformance with all applicable local, state and Federal laws and permits issued by jurisdictional regulatory agencies.

Permits necessary for treatment and disposal of accumulated water shall be obtained by the Contractor or the Agency as specified in the Special Provisions. Accumulated water shall be treated prior to disposal if so specified in the Specifications or required by a permit. The contractor shall submit a working drawing and related supporting information detailing its proposed plan and methodology and treatment and disposal of accumulated water. To the maximum extent practical, the Contractor shall reuse non-toxic, de-silted water for other onsite needs, such as dust control and irrigation.

The plan shall identify the location, type and size of dewatering devices and related equipment, the size and type of materials composing the collection system, the size and type of equipment to be used to retain and, if required, treat accumulated water, and the proposed disposal locations. If the proposed disposal location is a sanitary sewer, the Contractor shall submit to the Engineer written evidence of permission from the owner. If the proposed disposal location is a storm drain system or receiving body of water, the Contractor shall submit written evidence of permission from the owner of the storm drain system and, if not obtained by the City,

Page 800 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 90 of 192 Cape Seal 2025 Project No. MP2025
original signed permits from jurisdictional regulatory agencies or written evidence that such permits are not required.
7-1.01G(5) REFERENCE PUBLICATIONS
Reference publications are as follows:

1. California State Water Resources Control Board (SWRCB) Construction General Permit Order 2009- 009-DWQ adopted on September 2, 2009. Available at: the following website:
http://www.swrcb.ca.gov/board_decisions/adopted_orders/water_quality/2012/wqo2012_0006_dwq.pdf

2. California Stormwater Quality Association (CASQA) Stormwater Best Management Practice Handbook. Available at: the following website:
www.casqa.org/resources/bmp-handbooks/construction

3. Erosion and Sediment Control Field Manual, San Francisco Regional Water Quality Control Board (SFRWQCB) Available from Friends of the San Francisco Estuary, 1515 Clay Street, Suite 1400, Oakland, CA 94612 (510) 622-2419 or (510) 622-2337. Available at: the following website:
www.abag.ca.gov/abag/overview/pub/erosion.html

4. Manual of Standards for Erosion and Sediment Control Measures. Association of Bay Area Governments (ABAG.) Available from ABAG, 101 8th Street, Oakland, CA 94607, (510) 464-7900.

Available at: the following website:
www.abag.ca.gov/abag/overview/pub/erosion.html

5. CalTrans Stormwater Quality Handbooks. Available at: the following website:
www.dot.ca.gov/hq/construc/stormwater/CSBMPM_303_Final.pdf 7-1.01G(6) MATERIAL STORAGE
Storage and exposure of raw materials, by-products, finished products, and containers shall be controlled as described below:

1. All construction materials shall be stored at least ten feet away from inlets, catch basins, and curb returns. The Contractor shall not allow any material to enter the storm drain system. Measures shall be taken to maintain a neat and protected pile. At the end of each working day, the Contractor shall collect and dispose of all scrap, debris, and waste material excluding materials set aside for recycling and salvage. Materials set aside for recycling and salvage shall be delivered to the recycling station within five days.

2. Materials that can contaminate rainwater or be transported by storm water or other runoff to the storm drain system require special storage. During wet weather or when rain is forecast, the Contractor shall store such materials inside a building or cover them with a tarp or other waterproof material secured with weighted tires or sandbags to prevent contact with rain.

3. The Contractor is reminded that storage and disposal of all hazardous materials such as paints, thinners, solvents, and fuels; and all hazardous wastes such as waste oil, must meet all federal, state and local standards and requirements.

Page 801 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 91 of 192 Cape Seal 2025 Project No. MP2025
7-1.01G(7) PAVEMENT SAW CUTTING OPERATIONS
The Contractor shall prevent any saw cutting debris from entering the storm drain system. The Contractor shall preferably use dry cutting techniques and sweep up residue. If wet methods are used, the Contractor shall vacuum slurry as cutting proceeds or collect all wastewater by constructing a sandbag sediment barrier.

The bermed area shall be of adequate size to collect all wastewater and solids. The Contractor shall allow collected water to evaporate, as approved by the Engineer, if the wastewater volume is minimal and if maintaining the ponding area does not interfere with public use of the street area, create a safety hazard, or does not create standing water that remains longer than 72 hours. If the Engineer approves, the Contractor may direct or pump saw cutting wastewater to a dirt area for infiltration. This dirt area shall be adequate to contain all the wastewater. After wastewater has infiltrated, all remaining saw cutting residue must be removed and disposed of properly.

With the approval of Vallejo Flood and Wastewater District (VFWD) and the Engineer, de-silted water may be pumped to the sanitary sewer to assist in the evaporation or infiltration process. Remaining silt and debris from the ponding or bermed area shall be removed or vacuumed and disposed of properly. If a suitable dirt area is not available or discharge to the sanitary sewer is not feasible, with the Engineer’s approval the Contractor shall filter the saw-cutting wastewater through filtering materials and methods meeting ABAG Standards for Erosion and Sedimentation Control Measures (latest edition) before discharging this wastewater to the storm drain.
7-1.01G(8) PAVEMENT OPERATIONS
The Contractor shall prevent the discharge of pollutants from paving operations by using measures to prevent run-on and runoff pollution, properly disposing of wastes, and by implementing the following Best Management Practices:
a. No paving during wet weather.
b. Store materials as required by 7-1.01G(6) Material Storage, c. Cover inlets and manholes when applying asphalt, seal coat, tack coat, slurry seal, fog seal, etc. d. Place drip pans or absorbent materials under paving equipment when not in use. During wet weather store contaminated paving equipment indoors or cover with tarp or other waterproof covering. e. Sweep work site daily to prevent sand, gravel or excess asphalt from entering, or being transported by rain, into the storm drain system.
f. Keep ample supplies of drip pans or absorbent materials on-site. g. If paving involves Portland cement concrete, refer to 7-1.01G(6) Material Storage. 7-1.01G(9) CONCRETE OPERATIONS
The Contractor shall prevent pollutant discharge from concrete operations by using measures to prevent run- on and runoff pollution, by properly disposing of wastes, and by implementing the following BMPs:
a. Store all materials in waterproof containers or under cover away from drain inlets or drainage areas. b. Avoid mixing excess amounts of Portland cement materials.

Page 802 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 92 of 192 Cape Seal 2025 Project No. MP2025
c. Do not wash out concrete trucks into storm drains, open ditches, streets, streams etc. Whenever possible, perform washout of concrete trucks off site where discharge is controlled and not permitted to discharge to the storm drain system.

For on-site washout:
i. Locate washout area at least 50 feet from storm drains, open ditches or other water bodies, preferably in a dirt area. Prevent runoff from this area by constructing a temporary pit or bermed area large enough to store the liquid and solid waste.
ii. Wash out concrete wastes into the temporary pit where the concrete can set, be broken up and then disposed of properly. If the water volume is greater than what will allow concrete to set, allow the wash water to infiltrate and/or evaporate, if possible. Otherwise, allow wash water to settle, then filter and pump it to the sanitary sewer with approval from VSFCD and the Engineer. Remove or vacuum the remaining silt and debris from the ponding or bermed area and dispose of it properly. d. Dispose of wastewater from exposed aggregate washing to a dirt area adequate to contain all the wastewater. Once the wastewater has infiltrated, remove any remaining residue. If a suitable dirt area is not available, filter the wash water through straw bales or other filtering materials meeting ABAG Standards for Erosion and Sediment Control Measures before discharging the wash water to the sanitary sewer with approval from VSFCD and the Engineer. e. Collect and return sweepings from exposed aggregate concrete to a stockpile or dispose of the waste in a trash container.
7-1.01G(10) GRADING AND EXCAVATION OPERATIONS
The Contractor shall implement sedimentation and erosion control measures to prevent sediments or excavated material from entering the storm drain system.

The erosion and sedimentation control materials and methods shall be in accordance with ABAG Standards for Erosion and Sediment Control Measures and/or the procedures and methods described in the SFRWQCB Erosion and Sediment Control Field Manual.

At a minimum, the Contractor shall install filter materials (such as sandbags, filter fabric, etc.) at storm drain inlet(s) located in and downstream of the project site. These materials must be in place between October 15 and April 15 and also when rain is forecast within 24 hours. The Contractor shall install filter materials or seal all surface inlet openings during the dry season or if there is potential for sediment or excavated material to be discharged to the storm drain system during the construction operation (e.g. sediments and debris tracked by construction vehicles, wind-blown or transported by other runoff). The storm drain inlets shall be sealed such that they can be opened in an emergency and unblocked at the end of each working day, so that no property is damaged as a result of accidents or overflows.

Sedimentation and erosion control/filter materials shall be placed in a manner to restrain any debris or sediment from flowing into the storm drain system. Said materials or control devices shall also be maintained and/or replaced as necessary to ensure effective sediment control and to prevent flooding. 7-1.01G(11) SPILL PREVENTION AND CONTROL
The Contractor shall take all precautions to prevent accidental spills during construction. However, in the event

Page 803 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 93 of 192 Cape Seal 2025 Project No. MP2025
of a spill, the Contractor shall immediately contain any leaks/spills to prevent them from entering the storm drain system. The Contractor shall properly clean up and dispose of spilled wastes and resulting clean-up materials. If the spilled waste is hazardous, the Contractor shall comply with all federal, state and local hazardous waste requirements.
a. The Contractor shall not wash any spilled material into the streets, gutters, storm drains, or creeks. b. The Contractor shall report any hazardous materials spill immediately to the Vallejo Fire Department, the Solano County Department of Resource Management Environmental Services Division Hazardous Materials Section and other state and local agencies as required by state and local regulations. 7-1.01G(12) VEHICLE/EQUIPMENT CLEANING
The use of soaps, solvents, de-greasers, steam cleaning equipment or equivalent methods for vehicle or equipment cleaning on-site or in the street is not permitted. Vehicle or equipment may be cleaned only with water in a designated, bermed area of adequate size. Rinse water may not runoff site or into the storm drain system. The rinse-water shall be permitted to infiltrate in dirt area or shall be discharged to the sanitary sewer with the approval of VFWD and the Engineer.

The Contractor shall dispose of wash water from the cleaning of water-based paint equipment and tools to the sanitary sewer.

When using oil-based paint the Contractor shall, to the maximum extent practicable, filter the paint thinner and solvents for reuse. Any waste thinner, solvent, and sludge from the cleaning of equipment and tools shall be disposed as hazardous waste.
7-1.01G(13) CONTRACTOR TRAINING AND AWARENESS
The Contractor shall train all employees on the water pollution prevention requirements contained in these specifications. The Contractor shall inform all subcontractors of the water pollution prevention contract requirements and include appropriate subcontract provisions to ensure that these requirements are met.

The Contractor shall mark all new catch basins constructed as part of the project with storm drain markers with the logo "No Dumping: Drains to the Bay". Storm drain markers shall be approved by the City Engineer. 7-1.01G(14) GOOD HOUSEKEEPING PRACTICES
The Contractor shall implement the following applicable good housekeeping practices. a. Store all materials that have the potential to be transported to the storm drain system by storm runoff or by a spill under cover in a contained area or in sealed waterproof containers. b. Use ground tarps to collect fallen debris or splatters that could contribute to storm water pollution. c. Secure opened bags of cement, and other light materials or powders that can be transported by wind. d. Pick up litter, construction debris and other wastes daily from outside areas including the sidewalk area, gutter, street pavement and storm drains impacted by the project. Store all wastes in covered containers or dispose of immediately. Arrange for appropriate collection of those materials separated

Page 804 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 94 of 192 Cape Seal 2025 Project No. MP2025
for recycling.
e. Dispose of wash water to the sanitary sewer with the approval of VSFCD and the Engineer or recycle wash water. Refer to 7-1.01G(9) Concrete Operations.
f. Inspect vehicles and equipment arriving on-site for leaking fluids and promptly repair leaking vehicles and equipment. Use drip pans to catch leaks until repairs are made. g. Avoid spills by handling materials carefully. Keep a stockpile of spill materials, such as rags or absorbents, readily accessible on-site. Clean up all spills immediately to prevent any material from being discharged to the storm drain system. Refer to 7-1.01G(11) Spill Prevention and Control. h. Train employees regularly on good housekeeping practices and BMPs. Assign specific employees responsibility for BMPs, good housekeeping practices, and actions to take in the event of a spill. Refer to 7-1.01G(13) Contractor Training and Awareness.
i. Maintain and replace all sediment and water pollution control devices as necessary to ensure that said controls are working effectively (e.g. inspect all sediment ponds or sandbag sedimentation/filtering systems after each rain. Remove accumulated sediment and debris and replace or repair damaged sandbags immediately.)
7-1.01G(15) PAYMENT
Unless otherwise specified in the Specifications, payment for implementation and maintenance of BMPs, implementing SWPPP measures and other work of this section (including dewatering) shall be deemed included in the price paid for associated contract bid items, and no additional payment shall be made therefor. 7-1.01G(16) ENFORCEMENT
Various sections of the Vallejo Municipal Code12.41 enforce section 7.101G. City enforcement may include, but is not limited to: citations, abatement orders, bills for City cleanup costs and administration, civil suits, and criminal charges. City enforcement actions do not void or suspend any enforcement actions by other agencies.

At a minimum, the Contractor shall implement the storm water Clean Water Program BMPs listed in 7-1.01G(1) General, or implement equally effective alternatives approved by the Engineer on all projects within the City of Vallejo.
7-1.01H USE OF PESTICIDES
The Contractor shall comply with all rules and regulations of the Department of Food and Agriculture, the Department of Health, the Department of Industrial Relations, City of Vallejo Standard Specifications and all other agencies which govern the use of pesticides required in the performance of the work on the Contract.

Pesticides shall include but shall not be limited to herbicides, insecticides, fungicides, rodenticides, germicides, nematocides, bactericides, inhibitors, fumigants, defoliants, desiccants, soil sterilants and repellents.

Any substance or mixture of substances intended for preventing, repelling, mitigating, or destroying weeds, insects, diseases, rodents, or nematodes and any substance or mixture of substances intended for use as a plant regulator, defoliant or desiccant shall be considered a pesticide.

Page 805 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 95 of 192 Cape Seal 2025 Project No. MP2025
7-1.01I SOUND CONTROL REQUIREMENTS
The Contractor shall comply with all local sound control and noise level rules, regulations and ordinances which apply to any work performed pursuant to the Contract.

Each internal combustion engine, used for any purpose on the job or related to the job, shall be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine shall be operated on the project without the muffler.

The noise level from the Contractor's operations, between the hours of 9:00 p.m. and 7:00 a.m. shall not exceed 50 dBA and between the hours of 7:00 a.m. and 9:00 p.m. shall not exceed 80 dBA at a distance of 50 feet.

Said noise level requirement shall apply to all equipment on the job or related to the job, including but not limited to trucks, transit mixers or transient equipment that may or may not be owned by the Contractor. The use of loud sound signals shall be avoided in favor of light warnings except those required by safety laws for the protection of personnel.

Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor.
7-1.01J ASSIGNMENT OF ANTITRUST ACTIONS
The Contractor's attention is directed to the following requirements in Public Contract Code 7103.5 and Government Code Sections 4553 and 4554, which shall be applicable to the Contractor and the Contractor's subcontractors:
"In entering into a public works Contract or a subcontract to supply goods, services, or materials pursuant to a public works Contract, the Contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.

Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works Contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties.

If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under this chapter, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, attributable to overcharges that were paid by the assignor but were not paid by the public body as part of the bid price, less the expenses incurred in obtaining that portion of the recovery.

Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under this part if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action." 7-1.02 LOAD LIMITATIONS
Unless expressly permitted in the special provisions, construction equipment or vehicles of any kind which,

Page 806 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 96 of 192 Cape Seal 2025 Project No. MP2025
laden or unladen, exceed the maximum weight limitations set forth in Division 15 of the Vehicle Code, shall not be operated over completed or existing treated bases, surfacing, pavement or structures in any areas within the limits of the project, whether or not the area is subject to weight limitations under Section 7-1.01D, "Vehicle Code," except as hereinafter provided in this Section 7-1.02. 7-1.03 PAYMENT OF TAXES
The Contract prices paid for the work shall include full compensation for all taxes which the Contractor is required to pay, whether imposed by Federal, State or local government, including, without being limited to, Federal excise tax. No tax exemption certificate or any document designed to exempt the Contractor from payment of any tax will be furnished to the Contractor by the City of Vallejo, as to any tax on labor, services, materials, transportation, or any other items furnished pursuant to the Contract. 7-1.04 PERMITS AND LICENSES
The City will waive all required City of Vallejo permit fees for this project.

The Contractor and all subcontractors shall obtain and keep current for the duration of the project a City of Vallejo business license.

The Contractor shall give all notices required by and comply with all laws, codes, ordinances and regulations.

Before installing any work, the Contractor shall carefully examine the Contract Documents for compliance with all laws, codes, ordinances and regulations and shall immediately report any discrepancy to the Engineer.

Should the Contractor proceed with the construction and/or install any utility variance, notwithstanding the fact that such installation is in compliance with the Contract Documents, or should the Contractor install any work not in compliance with all laws, codes, ordinances and regulations, the Contractor shall remove such work without cost to the City of Vallejo.

The Contractor shall commit no trespass on any public or private property in any operation due to or connected with the improvements embraced in this contract.

The Environmental Quality Act (Public Resources Code, Sections 21000 to 21176, inclusive) may be applicable to permits, licenses and other authorizations which the Contractor must obtain from local agencies in connection with performing the work of the Contract. The Contractor shall comply with the provisions of those statutes in obtaining the permits, licenses and other authorizations and they shall be obtained in sufficient time to prevent delays to the work.

In the event that the City of Vallejo has obtained permits, licenses or other authorizations, applicable to the work, in conformance with the requirements in the Environmental Quality Act or any other authority, the Contractor shall comply with the provisions of those permits, licenses and other authorizations. 7-1.05 PATENTS
The Contractor shall assume all costs arising from the use of patented materials, equipment, devices or processes used on or incorporated in the work, and agrees to indemnify and save harmless the City of Vallejo, the Director, the Engineer, and their duly authorized representatives, from all suits at law, or actions of every nature for, or on account of the use of any patented materials, equipment, devices or processes.

Page 807 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 97 of 192 Cape Seal 2025 Project No. MP2025
7-1.06 SAFETY AND HEALTH PROVISIONS
The Contractor shall conform to all applicable occupational safety and health standards, rules, regulations and orders established by the State of California.

Working areas utilized by the Contractor to perform work during the hours of darkness, shall be lighted to conform to the minimum illumination intensities established by California Division of Occupational Safety and Health Construction Safety Orders.

All lighting fixtures shall be mounted and directed in a manner precluding glare to approaching traffic.

Full compensation for conforming to the provisions in this section shall be considered as included in the Contract prices paid for the various items of work involved and no separate payment will be made therefor. 7-1.07 (BLANK)
7-1.08 PUBLIC CONVENIENCE
This Section 7-1.08 defines the Contractor's responsibility with regard to convenience of the public and public traffic in connection with the Contractor's operations.

Attention is directed to Section 7-1.09, "Public Safety," for provisions relating to the Contractor's responsibility for the safety of the public. The provisions in Section 7-1.09 are in addition to the provisions in this Section 7-

1.08, and the Contractor will not be relieved of the responsibilities as set forth in Section 7-1.09 by reason of conformance with any of the provisions in this Section 7-1.08.

Attention is directed to Section 12, "Construction Area Traffic Control Devices," for provisions concerning flagging and traffic-handling equipment and devices used in carrying out the provisions in this Section 7-1.08 and Section 7-1.09.

In the event of a suspension of the work, attention is directed to Section 8-1.05, "Temporary Suspension of Work."
The Contractor shall so conduct operations as to offer the least possible obstruction and inconvenience to the public and shall have under construction no greater length or amount of work than can be prosecuted properly with due regard to the rights of the public.

Unless otherwise provided in the special provisions, all public traffic shall be permitted to pass through the work with as little inconvenience and delay as possible. Where possible, public traffic shall be routed on new or existing paved surfaces.

Spillage resulting from hauling operations along or across any public traveled way shall be removed immediately by the Contractor at the Contractor's expense.

Existing traffic signals and highway lighting shall be kept in operation for the benefit of the traveling public during progress of the work, and other forces will continue routine maintenance of existing systems.

Construction operations shall be conducted in such a manner as to cause as little inconvenience as possible to abutting property owners.

Convenient access to driveways, houses, and buildings along the line of the work shall be maintained and

Page 808 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 98 of 192 Cape Seal 2025 Project No. MP2025
temporary approaches to crossings or intersecting highways shall be provided and kept in good condition.

When the abutting property owner's access across the right of way line is to be eliminated, or to be replaced under the Contract by other access facilities, the existing access shall not be closed until the replacement access facilities are usable.

The Contractor may be required to cover certain signs which regulate or direct public traffic to roadways that are not open to traffic. The Engineer will determine which signs shall be covered. Except as otherwise provided for construction area signs in Section 12, "Construction Area Traffic Control Devices," furnishing, installing and removing covers will be paid for as extra work as provided in Section 4-1.03D.

Roadway excavation and the construction of embankments shall be conducted in such a manner as to provide a reasonably smooth and even surface satisfactory for use by public traffic at all times; sufficient fill at culverts and bridges to permit traffic to cross shall be placed in advance of other grading operations; and if ordered by the Engineer roadway cuts shall be excavated in lifts and embankments constructed part width at a time, construction being alternated from one side to the other and traffic routed over the side opposite the one under construction. Culvert installation or culvert construction shall be conducted on but one-half the width of the traveled way at a time, and that portion of the traveled way being used by public traffic shall be kept open and unobstructed until the opposite side of the traveled way is ready for use by traffic.

Upon completion of rough grading at the grading plane, or placing any subsequent layer thereon, the surface of the roadbed shall be brought to a smooth, even condition free of humps and depressions, satisfactory for the use of public traffic.

After the surface of the roadbed has been brought to a smooth and even condition for the passage of public traffic as above provided, any work ordered by the Engineer for the accommodation of public traffic prior to commencing subgrade operations will be paid for as extra work as provided in Section 4-1.03D. After subgrade preparation for a specified layer of material has been completed, the Contractor shall, at the Contractor's expense, repair any damage to the roadbed or completed subgrade, including damage caused by the Contractor's operations or use by public traffic.

While subgrade and paving operations are underway, public traffic shall be permitted to use the shoulders and, if half-width paving methods are used, shall also be permitted to use the side of the roadbed opposite the one under construction. When sufficient width is available, a passageway wide enough to accommodate at least 2 lanes of traffic shall be kept open at locations where subgrade and paving operations are in active progress.

Any shaping of shoulders or reshaping of subgrade necessary for the accommodation of public traffic thereon during subgrade preparation and paving operations will be paid for as extra work as provided in Section 4-1.03D.

Water or dust palliative shall be applied if ordered by the Engineer for the alleviation or prevention of dust nuisance as provided in Section 10, "Dust Control."
The Contractor will be required to pay the cost of replacing or repairing all facilities installed under extra work for the convenience or direction or warning of public traffic that are lost while in the Contractor's custody, or are damaged by reason of the Contractor's operations to such an extent as to require replacement or repair, and deductions from any moneys due or to become due the Contractor will be made to cover the cost.

Whenever a section of surfacing, pavement or the deck of a structure has been completed, the Contractor shall open it to use by public traffic if the Engineer so orders or may open it to use by public traffic if the Engineer so consents. In either case the Contractor will not be allowed any compensation due to any delay, hindrance or inconvenience to the Contractor's operations caused by public traffic, but will thereupon be relieved of responsibility for damage to completed permanent facilities caused by public traffic, within the limits of that use. The Contractor will not be relieved of any other responsibility under the Contract nor will the Contractor be relieved of cleanup and finishing operations.

Except as otherwise provided in this Section 7-1.08 or in the special provisions, full compensation for

Page 809 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 99 of 192 Cape Seal 2025 Project No. MP2025
conforming to the provisions in this Section 7-1.08 shall be considered as included in the prices paid for the various Contract items of work and no additional compensation will be allowed therefor.

Contractor shall furnish, install and maintain all traffic warning and directional signs necessary to maintain the facility in a passable condition at all times. Temporary traffic control shall meet the requirements of the latest State of California Department of Transportation Manual of Traffic Controls for Construction and Maintenance Work Zones. The contractor shall submit a Temporary traffic control Plan for review and acceptance by the Engineer at the pre-construction meeting.

The Contractor shall designate in writing the name, address and telephone number of the employee and the superintendent to contact after working hours for the proper maintenance of barriers and signs.

Barricades of the flashing beacon variety shall be placed at each excavation site and left until the Engineer deems there is no longer a hazard.

Full compensation for furnishing all flag persons necessary for the direction of public traffic either through or around the work shall be considered as included in the various contract items of work, and no additional compensation will be allowed therefor.
7-1.09 PUBLIC SAFETY
It is the Contractor's responsibility to provide for the safety of traffic and the public during construction.

Attention is directed to Section 7-1.12, "Indemnification and Insurance." Attention is directed to Section 7-1.08, "Public Convenience," for provisions relating to the Contractor's responsibility for providing for the convenience of the public in connection with the Contractor's operations.

Attention is directed to Section 12, "Construction Area Traffic Control Devices," for provisions concerning flagging and traffic-handling equipment and devices used in carrying out the provisions of Section 7-1.08 and this Section 7-1.09.

Whenever the Contractor's operations create a condition hazardous to traffic or to the public, the Contractor shall, at the Contractor's expense and without cost to the City of Vallejo, furnish, erect and maintain those fences, temporary railing (Type K), barricades, lights, signs and other devices and take such other protective measures that are necessary to prevent accidents or damage or injury to the public.

Fences, temporary railing (Type K), barricades, lights, signs, and other devices furnished, erected and maintained by the Contractor, at the Contractor's expense, are in addition to any construction area traffic control devices for which payment is provided for elsewhere in the Contract Documents.

The Contractor shall also furnish such flaggers as are necessary to give adequate warning to traffic or to the public of any dangerous conditions to be encountered, and payment therefor will be made as provided in Section 12-2.02, "Flagging Costs."
Signs, lights, flags, and other warning and safety devices and their use shall conform to the requirements set forth in the current California Manual on Uniform Traffic Controls. Devices or other protective devices furnished and erected by the Contractor, at the Contractor's expense, as above provided, shall not obscure the visibility of, nor conflict in intent, meaning and function of either existing signs, lights and temporary traffic control devices or any construction area signs and temporary traffic control devices for which furnishing of, or payment for, is provided elsewhere in the Specifications. Signs furnished and erected by the Contractor, at the Contractor's expense, shall be approved by the Engineer as to size, wording and location.

Page 810 of 994 ends

Ghilotti Bros. Inc. Construction Contract Page 100 of 192 Cape Seal 2025 Project No. MP2025
The installation of general roadway illumination shall not relieve the Contractor of the responsibility for furnishing and maintaining any of the protective facilities herein before specified.

Construction equipment shall enter and leave the highway via existing ramps and crossovers and shall move in the direction of public traffic. All movements of workmen and construction equipment on or across lanes open to public traffic shall be performed in a manner that will not endanger public traffic.

The Contractor's trucks or other mobile equipment which leave a freeway lane, that is open to public traffic, to enter the construction area, shall slow down gradually in advance of the location of the turnoff to give following public traffic an opportunity to slow down.

When leaving a work area and entering a roadway carrying public traffic, the Contractor's equipment, whether empty or loaded, shall in all cases yield to public traffic.

Lanes, ramps and shoulders shall be closed in accordance with the details shown on the drawings, the provisions of Section 12, "Construction Area Traffic Control Devices," and as provided in the special provisions.

The Contractor shall notify the Engineer not less than 15 days before the anticipated start of each falsework and girder erection operation whenever the falsework or girders will reduce clearances available to public traffic.

Pedestrian openings through falsework shall be paved or provided with full width continuous wood walks and shall be kept clear. Pedestrians shall be protected from falling objects and curing water for concrete. Overhead protection for pedestrians shall extend not less than 1.2 m {4 feet} beyond the edge of the bridge deck. All pedestrian openings through falsework shall be illuminated in conformance with the provisions in Section 86-6.11, "Falsework Lighting."
Where the height of vehicular openings through falsework is less than 4.6 m {15 feet}, a W34B "Vertical Clearance" sign shall be provided above each opening facing approaching traffic. The signs shall have black letters and numbers on an orange reflectorized background and shall be illuminated so that the signs are clearly visible. The minimum height of the letters and numbers shall be 150 mm {6 inches} and 250 mm {10 inches}, respectively.

No material or equipment shall be stored where it will interfere with the free and safe passage of public traffic, and at the end of each day's work and at other times when construction operations are suspended for any reason, the Contractor shall remove all equipment and other obstructions from that portion of the roadway open for use by public traffic.

Temporary facilities which the Contractor uses to perform the work shall not be installed or placed where they will interfere with the free and safe passage of public traffic.

Temporary facilities which could be a hazard to public safety if improperly designed shall comply with design requirements specified in the Contract for those facilities or, if none are specified, with standard design criteria or codes appropriate for the facility involved. Working drawings and design calculations for the temporary facilities shall be prepared and signed by an engineer who is registered as a Civil Engineer in the State of California and shall be submitted to the Engineer for review pursuant to Section 5-1.02, "Plans and Working Drawings." The submittals shall designate thereon the standard design criteria or codes used. Installation of the temporary facilities shall not start until the Engineer has reviewed and accepted the drawings.

Should the Contractor appear to be neglectful or negligent in furnishing warning devices and taking protective measures as above provided, the Engineer may direct attention to the existence of a hazard and the necessary warning devices shall be furnished and installed and protective measures taken by the Contractor at the Contractor's expense. Should the Engineer point out the inadequacy of warning devices and protective measures, that action on the part of the Engineer shall not relieve the Contractor from responsibility for public safety or abrogate the obligation to furnish and pay for these devices and measures.

Page 811 of 994 ends
← All documents from this meeting