Bear Valley Rd Luna Rd 45 mph
Luna Rd Palmdale Rd 50 mph
Palmdale Rd Seneca Rd 50 mph
Seneca Rd Hook Blvd 55 mph
Hook Blvd Mojave Dr 55 mph
Arlette Dr Seneca Rd Hook Blvd 45 mph
Arrowhead Dr. Nisqualli Rd 800’ south of Petite St 50 mph 800’ south of Petite St Green Tree Blvd 40 mph
Green Tree Blvd Camelback Dr 25 mph
Bear Valley Rd. Monte Vista Rd Hwy 395 60 mph
Hwy 395 Amethyst Rd 55 mph
Amethyst Rd Dunia 50 mph
Dunia Cottonwood Ave 40 mph
Cottonwood Ave Cypress Ave 50 mph
Cypress Ave 2nd Ave 50 mph
2nd Ave Apatite Ave 50 mph
Apatite Ave Spring Valley Pkwy 50 mph
Spring Valley Pkwy E. City Limit 50 mph
Burning Tree Dr. Yates Rd Molino Dr 25 mph
Cantina Dr. Bear Valley Rd Durango Dr 50 mph
Durango Dr La Mesa Rd 50 mph
Civic Dr. Amargosa Rd Seneca Rd 35 mph
Seneca Rd Roy Rogers Dr 45 mph
Clovis St. El Evado Rd Llanada Ave 25 mph
Cobalt Rd. Sycamore St Bear Valley Rd 40 mph
Bear Valley Rd La Mesa Rd 40 mph
Luna Rd Palmdale Rd 40 mph
Cottonwood Ave. Bear Valley Rd Mariposa Rd 45 mph
Crestview Dr. Hesperia Rd Brentwood Dr 25 mph
Diamond Rd Hook Blvd Mojave Dr 40 mph
Dos Palmas Rd. Fuchsia Ln HWY 395 45 mph
Mesa Linda to Cobalt Rd 45 mph
Cobalt Rd Amethyst Rd 45 mph
Eagle Ranch Pkwy Bear Valley Rd Honeybear Ln 45 mph
Ordinance No. 2434
Honeybear Ln Mesa Linda Ave 35 mph
Mesa Linda Ave Cantina Dr 40 mph
El Evado Rd. Northstar Ave La Mesa Rd 45 mph
La Mesa Rd Luna Rd 45 mph
Palmdale Rd Seneca Rd 45 mph
Seneca Rd Mojave Dr 50 mph
Mojave Dr Hopland St 50 mph
Hopland St Haverhill St 25 mph
El Rio Rd. La Mesa Rd Dos Palmas Rd 35 mph
Eleventh St. Verde St 1250' n/o Verde St 25 mph
1250' n/o Verde St D St 35 mph
Eucalyptus St Mesa Linda St Cloverly Ave 45 mph
Fifth Ave. Bear Valley Rd Silica Dr 40 mph
First Ave. Bear Valley Rd Jasmine St 35 mph
Jasmine St Nisqualli Rd 35 mph
Nisqualli Rd Green Tree Blvd 35 mph
Green Tree Blvd. 7th St 400’ east of
Wimbleton
40 mph
400’ east of Wimbleton Hesperia Rd 50 mph
Hesperia Rd. Bear Valley Rd Jasmine St 40 mph
Jasmine St Nisqualli Rd. 50 mph
Nisqualli Rd. Verde St 50 mph
Verde St D St 35 mph
Hollyvale St. Eucalyptus St Sycamore St 35 mph
Hook Blvd. Topaz Rd Amethyst Rd 50 mph
Amethyst Rd El Evado Rd 40 mph
El Evado Rd Amargosa Rd 50 mph
Hopland St. El Evado Rd Llanada Rd 35 mph
Hughes Rd. La Paz Dr Rodeo Dr 40 mph
Rodeo Dr Hesperia Rd 30 mph
Industrial Blvd. Bear Valley Rd Silica Rd 45 mph
Jade Rd. Bear Valley Rd La Mesa Rd 40 mph
Jasmine St. 2nd Ave Hesperia Rd 40 mph
Hesperia Rd Industrial Blvd 45 mph
La Mesa Rd Mesa View Dr Hwy 395 45 mph
Ordinance No. 2434
Hwy 395 Amargosa Rd 45 mph
La Paz Dr. Pebble Beach Dr Roy Rogers Dr 35 mph
Roy Rogers Dr Mojave Dr 40 mph
Mojave Dr Colina St 35 mph
Colina St northerly end 25 mph
Luna Rd. Mesa View Dr. Hwy 395 40 mph
Hwy 395 Mesa Linda Ave 40 mph
Mesa Linda Ave Amethyst Rd 40 mph
Amethyst Rd El Evado Rd 40 mph
El Evado Rd Amargosa Rd 40 mph
Mall Blvd. Bear Valley Rd Mall driveway 25 mph
Mariposa Rd. Bear Valley Rd Nisqualli Rd 45 mph
Nisqualli Rd 7th St 50 mph
Mc Art Rd. Palmdale Rd Seneca Rd 40 mph
Mesa Linda Ave. Eagle Ranch Pkwy La Mesa Rd 40 mph
La Mesa Rd Luna Rd 45 mph
Luna Rd Dos Palmas Rd 40 mph
Mesa Linda St Eucalyptus St Sycamore St 40 mph
Mesa View Dr. Olivine Rd Dos Palmas Rd 45 mph
Mojave Dr. Hwy 395 East Trail 60 mph
East Trail Ashley Glen Dr 50 mph
Ashley Glen Dr Amargosa Rd 50 mph
Amargosa Rd Condor Rd 50 mph
Condor Rd 6th St 40 mph
6th St Victor St 30 mph
National Trails
Hwy.
I-15 Mojave River 50 mph
Nisqualli Rd. Mariposa Rd Hesperia Rd 50 mph
Northstar Ave. San Ysidro St El Evado Rd 35 mph
Old Ranch Rd. Sycamore St Amethyst Rd 25 mph
Pacoima Rd. Bear Valley Rd Luna Rd 40 mph
Pahute Rd Ridgecrest Rd Spring Valley Pkwy 40 mph
Petaluma Rd. Bear Valley Rd Northstar Ave 35 mph
Phantom Rd. East Air Expressway Perimeter Rd 60 mph
Perimeter Rd Nevada Ave 60 mph
Ordinance No. 2434
Phantom Rd. West Air Expressway Nevada Ave 55 mph
Rancho Road. El Evado Rd Village Dr 40 mph
Village Dr Desert Willow St 45 mph
Redrock Rd Eagle Ranch Pkwy Topaz Rd 35 mph
Reno Loop Dr. (N) Hook Blvd East Trail 40 mph
Reno Loop Dr. (S) Hook Blvd Hook Blvd 35 mph
Ridgecrest Rd. Bear Valley Rd Pahute Rd 45 mph
Pahute Rd Yates Rd 55 mph
Rodeo Dr. Green Tree Blvd Seneca Rd 40 mph
Seneca Rd Victor St 35 mph
Roy Rogers Dr. Amargosa Rd Civic Dr 45 mph
Civic Dr La Paz Dr 45 mph
Second Ave. Bear Valley Rd Jasmine St 45 mph
Seneca Rd. Amethyst Rd El Evado Rd 50 mph
El Evado Rd Civic Dr 40 mph
La Paz Dr Hesperia Rd 45 mph
Seventh Ave. Bear Valley Rd Nisqualli Rd 45 mph
Seventh St. Mariposa Rd Center St 40 mph
Center St D St 35 mph
Shay Rd. Phantom East end (sewer plant) 55 mph
Shooting Star Dr. Bear Valley Rd Northstar Ave 40 mph
Silica Rd. Seventh Ave Hesperia Rd 35 mph
Hesperia Rd Industrial Blvd 50 mph
Spring Valley
Pkwy.
Bear Valley Rd Pahute Rd 40 mph
St Andrews Dr. Green Tree Blvd Lorene Dr 40 mph
Stoddard Wells Rd. D St I-15 Fwy 50 mph
I-15 Fwy Dante St 45 mph
Dante St Dump Rd 55 mph
Sycamore St. Hwy 395 Topaz Rd 40 mph
Topaz Rd Amethyst Rd 45 mph
Tamarisk Rd Bear Valley Rd Pahute Rd 40 mph
Third Ave. Silica Dr Nisqualli Rd 40 mph
Nisqualli Rd Green Tree Blvd 45 mph
Topaz Rd. Eucalyptus Sycamore St 45 mph
Ordinance No. 2434
Bear Valley Rd Redrock Ave 50 mph
Redrock Ave Luna Rd 50 mph
Luna Rd Dos Palmas Rd 50 mph
Valley Center Dr. 7th St La Paz Dr 35 mph
Village Dr. Mojave Dr Tawney Ridge Ln 45 mph
Tawney Ridge Ln Amargosa Rd 50 mph
Amargosa Rd Air Expressway 55 mph
Yates Rd. Mariposa Rd Green Tree Blvd 45 mph
SECTION 2. CEQA Exemption Finding
T
he City Council finds that this ordinance is not subject to review under the California Environmental Quality Act (“CEQA”) pursuant to Sections 15060(c)(2), 15060(c)(3), and/or 15061(b)(3) of the State CEQA Guidelines (California Code of Regulations, Title 14, Chapter 3).
The adoption of the speed limit amendments is being made pursuant to the California Vehicle Code and supported by required Engineering and Traffic Surveys and therefore will not result in a direct or reasonably foreseeable indirect physical change in the environment; is not considered a “project” under CEQA Guidelines Section 15378; and /or can be seen with certainty to have no possibility of a significant impact on the environment.
SECTION 3. Severability
T
he City Council declares that, should any provision, section, paragraph, sentence, or word of this Ordinance be rendered or declared invalid by any final court action in a court of competent jurisdiction or by reason of any preemptive legislation, the remaining provisions, sections, paragraphs, sentences or words of this Ordinance as hereby adopted shall remain in full force and effect.
SECTION 4. Effective Date
T
his Ordinance shall take effect thirty (30) days after its final passage.
SECTION 5. Repeal of Conflicting Provisions
A
ll provisions of the Victorville Municipal Code as heretofore adopted by the City Council that are in conflict with the provisions of this Ordinance are hereby repealed.
SECTION 6. Certification
T
he City Clerk shall certify to the passage of this Ordinance and shall cause the same to be published according to law.
Item Number: 12
City Council / Board of Directors
Consent Calendar
Meeting of: February 21, 2023
Submitted By:
Jorge Duran, Code Enforcement Official
Subject:
Code Compliance Department Activity Reports - FY2023 2nd Quarter, Code Compliance Animal Care & Control Divisions
Recommendation:
That the Honorable City Council review and file.
Fiscal Impact:
There is no fiscal impact associated with this action.
Strategic Plan Goal:
The item is related to Strategic Plan Goal B, Public Safety, as the activity reports provide statistical information on Code Compliance Department efforts relating to community enhancement and homeless outreach efforts, along with the care and control of animals.
Discussion:
The attached Code Compliance Department activity reports include information relating to compliance efforts for the 2nd Quarter for FY 2022/2023, (October 1 to December 31, 2022) related to land use, public nuisances, parking, homeless outreach and clean-up efforts, animal care and control programs, field activity, resident service calls and animal licensing.
Attachments: A. Code Compliance Division Activity Report B. Animal Care & Control Division Activity Report
Attachment A
Current Staff Levels
• 1 Code Enforcement Official
• 2 Supervisors
• 7 Code Enforcement Officer II
(3 assigned to the Homeless Engagement Team)
• 2 Code Enforcement Officer I
• 3 Technicians
Fiscal Year 2023, Qt. 2, October 1—December 31
In this Quarterly Report
Completed Recruitments
• 1 Enforcement Manager
• 4 Code Enforcement Officer II
• 1 Code Enforcement Officer I
Enforcement Type Comparison Page 4
Staff Levels & Fiscal Year Stats Page 1
Case Types & Enforcement Tasks Page 2
Case Type Comparison Page 3
Rental Inspection Comparison Page 5
Business License Comparison Page 5
Homeless Outreach Page 7
Parking Enforcement Comparison Page 6
• CEBL - Business License
• CEPK - Parking
• CEWA - Weed Abatement
• CODE - Property Maintenance
Case Types & Enforcement Tasks
Case Type Comparison
Enforcement Type Comparison
Rental Inspection Comparison & Issued Business License Comparison
Parking Enforcement Comparison
Homeless Outreach Surveys 10/01/2022 - 12/31/2022
• 84 outreach surveys were completed in the field during this time period. • 18 people accepted shelter.
• 38 people moved voluntarily.
• 26 people refused to be sheltered.
• 2 outreach interactions resulted in PD action.
• During this time period, the average bed occupancy was 78 (92 total) and the average ken- nel occupancy for pets was 5 (11 total).
Fiscal Year 2023, Qt. 2
Encampment Locations - Shelter Offered
Attachment B
Staff Levels Page 1
Case Counts Page 1
Highlights Page 2
Dog Licenses Page 3
In this Quarterly Report:
Quarterly Update FY 2023/ Quarter 2
Current Staffing Levels
Filled Positions
2 Animal Care & Control Supervisors
4 Animal Control Officers
1 Animal Control Technicians
Open Position Status
1 Enforcement Manager (In Process)
1 Lead Animal Control Officer
(Hiring Soon)
1Animal Control Officer (Hiring Soon)
1 Animal Control Technician (Hiring Soon)
Animal Control Vehicles
4 Trucks - Active Fleet
1 Truck - In Process
Quarter 2 of the 2023 fiscal year has an 18% case creation increase over the previous year and a 65% increase over 2020 during the same quarter. 22 14
34 44
63 1365
1286
975
1362
1610
7398
1922
Animals
Microchipped
In 2022!
236
On January 1, 2022, California
SB 573 went into effect. This
bill prohibits public animal
control agencies and animal
shelters from releasing a dog
or cat to an owner seeking to
reclaim it, or adopting out,
selling, or giving away an
animal to a new owner -
unless the dog or cat is or will
be microchipped.
Statistics show that stray
dogs and cats with
microchips, 25% and 38%
respectively, are more likely
to reunited with their owners
than without a microchip.
As a benefit to our residents,
all dogs licensed in the City of
Victorville qualify for a free
AVID microchip through the
Animal Control Office.
3636
1549
359
.
Item Number: 13
City Council / Board of Directors
Consent Calendar
Meeting of: February 21, 2023
Submitted By:
William Racowschi, Interim Fire Chief
Subject:
Notice of Completion - Automated Gate Services, Inc.
Recommendation:
That the Honorable City Council (1) accept as complete and approve the Notice of Completion for the installation of automatic gates at Fire Station 312, 313, 314 and 315, Project CC22-088 and (2) authorize the City Manager to execute the Notice of Completion.
Fiscal Impact:
This action will result in the fiscal impact of $155,163.00. Retention in the amount of five percent (5%) was withheld from each pay estimate during construction for a total of $155,163.00. Retention will be released after City Council approval and the recording of the Notice of Completion.
Account No. Contract Amount 5% Retention
105-20110 $155,163.00 $7,758.15
An additional appropriation is not required. There are sufficient funds to cover the planned expenses.
Strategic Plan Goal:
Goal E. Invest in Infrastructure.
Background:
On March 1, 2022, Council approved the award of contract to Automatic Gate Services, Inc., in the amount of $155,163.00 for the installation of automatic gates at Fire Station 312, 313, 314 and 315. The purpose of the project was to secure City assets and Fire Department equipment, as well as protect the personal vehicles of employees. Further, it 2 9
5 4
would address liability to the City by restricting unauthorized access to the fire station grounds where many hazards exist, and someone could be injured.
Discussion:
On December 12, 2022, the Project was completed and inspected to the satisfaction of staff. The final cost of the Project was $155,163.00. Therefore, staff recommends the Honorable City Council accept as complete and approve the issuance of the Notice of Completion for the automatic gates as Fire Station 312, 313, 314 and 315, Project CC22- 088 and authorize the execution by the City Manager.
Staff remains available for any questions the Council may have.
Attachments: A. Notice of Completion
Attachment A
Notice of Completion – Automated Gate Services, Inc
RECORDING REQUESTED BY:
CITY OF VICTORVILLE
WHEN RECORDED MAIL TO:
CITY OF VICTORVILLE
ATTN: CITY CLERK
P.O. BOX 5001
VICTORVILLE, CA 92393-5001
Recording of this document is fee-exempt under Government SPACE ABOVE THIS LINE FOR RECORDER’S USE Code Section 6103. No Documentary Transfer Tax is due on the document pursuant to Revenue Taxation Code Section 11922
PUBLIC CONTRACT
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN THAT:
1. The undersigned is OWNER or agent of the OWNER of the interest or estate stated below in the property hereinafter described.
2. The FULL NAME of the OWNER is CITY OF VICTORVILLE
3. The FULL ADDRESS of the OWNER is 14343 CIVIC DRIVE, VICTORVILLE, CA 92392 A work of improvement on the property hereinafter described was COMPLETED December 12, 2022
4. The work of improvement completed is described as follows: Automatic gates at Fire Station 312, 313, 314 and 315.
5. The NAME OF THE ORIGINAL CONTRACTOR, if any, for such work of improvement is Automated Gates Services, Inc.
6. The street address of said property is 15182 El Evado Road
7. Assessor’s Parcel Number: 3072-101-01
8. The property on which said work of improvement was completed is in the City of VICTORVILLE, County of SAN BERNARDINO, State of CALIFORNIA.
Verification of NON-INDIVIDUAL owner: I , Keith C. Metzler, the undersigned, declare under penalty of perjury under the laws of the State of California that I am the City Manager of the aforesaid interest or estate in the property described in the above notice; that I have read said notice, that I know and understand the contents thereof, and that the facts stated therein are true and correct.
at Victorville, California.
Date Keith C. Metzler, City Manager
CITY OF VICTORVILLE
Item Number: 14
City Council / Board of Directors
Consent Calendar
Meeting of: February 21, 2023
Submitted By:
Brian Gengler, City Engineer
Subject:
Seventh Avenue and Arrowhead Drive Capital Improvement Project Grant Funding Reimbursement
Recommendation:
That the Honorable City Council Adopt Resolution No. 23-010 to authorize the submittal of claims and requests for reimbursements from Transportation Development Act (TDA) Article 3 funds from the San Bernardino County Transportation Authority (SBCTA) and authorize the City Engineer to certify the completion of the project.
Fiscal Impact:
There will not be a fiscal impact resulting from this action. The TDA Article 3 funds discussed in this report are in the approved budget and an additional appropriation is not required. The budget account numbers, project and amount for these are shown in the table below.
Budget Account No. Project Amount
2334500-43110-60085 Arrowhead Dr. $124,800.00
2334500-43110-60118 Seventh Ave. $124,800.00
Total $249,600.00
Strategic Plan Goal:
This project aligns with Goal E, Strategy 1 in the City of Victorville Strategic Plan 2020- 2023, “Invest in Infrastructure” and “Implement the City’s Capital Improvement Program to meet community needs.” This project will result in investing in the City’s infrastructure by prolonging the useful life of pavement, and adding traffic lanes, bike lanes and sidewalk. This project was included in the City’s capital improvement program to meet the community’s needs for improved access for motor vehicles, bicycles, and pedestrians. 2 9
8 8
Background:
In 2016, the Engineering Department submitted an application for a TDA Article 3 Call for Projects for a Bicycle and Pedestrian Facilities grant. In 2017, the Engineering Department received a notification from SBCTA that the application was approved for funding in the amount of $249,600.00. In October of 2021, the City Council approved Resolution No. 21-103 to amend the 2021/2022 budget to appropriate the TDA funds from SBCTA to partially fund construction costs and awarded a construction contract to Sully-Miller Construction Co. On December 6, 2022, the City Council accepted the project as complete and authorized the recordation of the Notice of Completion.
Discussion:
To submit a reimbursement claim to SBCTA for the grant funds awarded and expended for in the Seventh Avenue and Arrowhead Drive Capital Improvement Project, SBCTA requires the City Council to adopt a project specific resolution to authorize the City to submit requests for reimbursements and to authorize the City Engineer to certify the completion of the project. Without the adoption of this resolution, the City will not receive a reimbursement of the grant funds from SBCTA. A resolution has been prepared which conforms to SBCTA’s requirements. The resolution reflects the title of the application submitted to SBCTA for the grant that was awarded, “Arrowhead Dr./7 th Ave Bike Lane and Sidewalk Project”.
Staff recommends that the Honorable City Council adopt Resolution No. 23-010 to authorize the submittal of claims and requests for reimbursements from TDA Article 3 funds from SBCTA and authorize the City Engineer to certify the completion of the project.
Staff remains available for any questions Council may have.
Attachments: A – Resolution No. 23-010
1 3
2 0
5 ATTACHMENT A
1 3
2 0
5 RESOLUTION NO. 23-010
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VICTORVILLE, AUTHORIZING SUBMITTAL OF A CLAIM TO THE
SAN BERNARDINO COUNTY TRANSPORTATION AUTHORITY FOR
TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 FUNDS FOR
ARROWHEAD DR/7th AVE BIKE LANE AND SIDEWALK PROJECT
WHEREAS, the Mills-Alquist-Deddeh Act (SB 325) was enacted by the California Legislature to improve existing public transportation services and encourage regional transportation coordination. Known as the Transportation Development Act (TDA) of 1971, this law provides funding to be allocated to transit and non-transit related purposes that comply with regional transportation plans; and
WHEREAS, TDA provides two funding sources, the Local Transportation Fund (LTF) and State Transit Assistance fund (STA); and
WHEREAS, LTF is derived from a ¼ cent of the general sales tax collected statewide and apportioned by population to areas within the county; and WHEREAS, STA is derived from the statewide sales tax on diesel fuel, plus an additional vehicle registration fee authorized under Senate Bill 1, referred to as the State of Good Repair, and both are apportioned by the State Controller’s Office 50% by population and 50% by transit operator revenues; and
WHEREAS, the San Bernardino County Transit Authority (SBCTA) authorizes funding for a wide variety of transportation programs in San Bernardino County, including planning and program activities, pedestrian and bicycle facilities, community transit services, public transportation, and bus and rail projects to local transportation agencies through annual apportionment and allocation processes, and approves payments periodically throughout the year; and
WHEREAS, SBCTA awarded the City of Victorville, TDA Article 3 grant funds in the amount of $249,600.00 for development of the Arrowhead Dr./7 th Ave Bike Lane & Sidewalk project within the City of Victorville jurisdiction through a competitive “Call for Projects”; and WHEREAS, TDA Article 3 grant funds are provided on a reimbursement basis; and WHEREAS, SBCTA requires the City of Victorville to submit a claim and request(s) for reimbursement; and
WHEREAS, submittal of the claim for TDA Article 3 funds must be first authorized by the Council; and
1 3
2 0
5 WHEREAS, the Arrowhead Dr/7 th Ave Bike Lane and Sidewalk Project award is over $200,000.00, and is eligible for progress reimbursement or for reimbursement at project completion; and
WHEREAS, SBCTA requires the designation of individuals authorized to certify Project completion; and
WHEREAS, the City Engineer, or their designee, is authorized to certify project completion.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF VICTORVILLE DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The recitals set forth above are true and correct and are incorporated into this Resolution by reference together with any definitions set forth therein.
SECTION 2. The City Engineer is authorized to certify project completion.
SECTION 3. The City Engineer is further authorized to submit a claim and request for reimbursement(s) for TDA Article 3 funds for the Arrowhead Dr/7th Ave Bike Lane and Sidewalk Project in the amount of $249,600.00 on behalf of the City of Victorville.
SECTION 4. That this Resolution shall take effect immediately upon its adoption.
Item Number: 15
City Council / Board of Directors
Consent Calendar
Meeting of: February 21, 2023
Submitted By:
Keith C. Metzler, City Manager
Subject:
Substitution of Trustee and Deed of Reconveyance and Release of Declaration of Covenants, Conditions and Restrictions (CC&R’s) for Map Case No. 08-08-08 - Streeter Recommendation:
That Your Honorable City Council:
1) Approve the Substitution of Trustee and Deed of Reconveyance for MAP Case No. 08-08-08;
2) Approve the Termination and Release of Declaration of Covenants, Conditions, and Restrictions and Notice of Affordability Restrictions on Transfer of Property; 3) Authorize the execution thereof by the City Manager; 4) Accept the payoff of the loan receivable; and
5) Adopt Resolution No. CHAS 23-001, amending the annual budget for Fiscal Year 2022- 2023.
Fiscal Impact:
Approval of this item will result in an additional revenue appropriation of $58,348 as follows:
Budget Acct. No. 205-18121-89023 (CHAS NR Map) - $25,538 (Principal) 2053080-45110-89023 (CHAS Interest Income) - $32,810 (Interest) Revenue of the former Redevelopment Agency’s (RDA) housing loans now belong to the City as Housing Assets Successor (CHAS) and must be spent on affordable housing related items.
Strategic Plan Goal:
While approval of the additional appropriation results in an increase of revenue, the repayment of Mortgage Assistance Program loans is not referred to in the City of Victorville Strategic Plan.
2 9
6 9
Background:
The former Redevelopment Agency (RDA) Board authorized staff to provide down payment assistance to first time homebuyers with very low, low and moderate incomes.
On September 25, 2008, the RDA issued Amanda Streeter (herein referred to as the Participant) a Mortgage Assistance Program (MAP) Loan in the amount of $25,538. The MAP Loan is evidenced by the attached Deed of Trust and Promissory Note recorded against the property on October 10, 2008. Please refer to page two (2), paragraph one (1) of the Deed of Trust, which references the $25,538 assistance that was provided to the Participant.
To date, there are six (6) former RDA MAP loans left outstanding.
Discussion:
The City as Housing Assets Successor (CHAS) of the Victorville Redevelopment Agency has been requested by the Participant to reconvey the Deed of Trust that secured the MAP Loan received on September 25, 2008. According to Section 3 of the Promissory Note, the repayment of the MAP Loan required the Participant to pay the principal loan of $25,538 plus a portion of equity, known as the “Equity Share”, calculated at $32,810 to satisfy the term and reconvey the Deed of Trust that secured the MAP Loan. The Equity Share was calculated as the product of the Accumulated Equity multiplied by the Equity Share Percentage. The Equity Share Percentage is the percentage of the MAP Loan relative to the Property Purchase Price.
On December 15, 2022, the Participant paid off the principal and equity share balance totaling $58,348.00. Additionally, Elevated Escrow, Inc. has requested the release of the encumbrance of the Declaration of Covenants, Conditions and Restrictions (CC&R’s).
Pursuant to Article 5 of the CC&R’s, the release of the CC&R’s may be requested by the Homeowner or its successors provided all amounts due and payable to CHAS under the program have been paid. Therefore, staff has prepared the attached Termination and Release of CC&R’s and Notice of Affordability Restrictions on Transfer of Property.
Since the Participant has satisfied the terms of the Promissory Note and the Deed of Trust, staff is requesting your approval in executing the recording of the Substitution of Trustee and Deed of Reconveyance, approval in executing the Termination and Release of Declaration of Covenants, Conditions and Restrictions and Notice of Affordability Restrictions on Transfer of Property, and adoption of Resolution No. CHAS 23-001.
Staff remains available for any questions or comments you might have.
Attachments: A. Substitution of Trustee and Deed of Reconveyance B. Termination and Release of Declaration of Covenants, Conditions and Restrictions and Notice of Affordability Restrictions on Transfer of Property
C. Resolution No. CHAS 23-001
D. Original Deed of Trust and Promissory Note
Attachment A
Substitution of Trustee and Deed of Reconveyance
RECORDED REQUESTED BY AND
WHEN RECORDED RETURN TO:
CITY OF VICTORVILLE,
a Municipal Corporation,
as Successor to Housing Assets of the
Victorville Redevelopment Agency
ATTN: LESYENIA MARIN-PINEDA
P.O. BOX 5001
VICTORVILLE, CA 92393-5001
MAP Case No. 08-08-08
____________________________________________________________________________
APN: 0395-471-52
15465 Amber Pointe Drive
Victorville, CA 92394
SUBSTITUTION OF TRUSTEE AND FULL RECONVEYANCE
Whereas, AMANDA STREETER , was the original Trustor, First American Title Company, a California corporation, the original Trustee, and the former Victorville Redevelopment Agency, the original beneficiary, pu rsuant to that certain Deed of Trust executed by the original Trustor s, dated September 25, 2008, and recorded on October 10, 2008, as Instrument No. 2008-0455559 in the Official Records of San Bernardino County, in the State of California (“Deed of Trust”).
Whereas, the interests of the former Victorville Redevelopment Agency, as original Beneficiary, under the Deed of Trust were erroneously assigned to the Victorville Housing Trust pursuant to that certain Assignment and Assumption Agreement executed by the Successor Agency to the Victorville Redevelopment Agency and the Victorville Hous ing Trust, dated February 12, 2013 and recorded on March 12, 2013, in the Official Records as Instrument No. 2013-0102515 and subsequently reassigned to City of Victorville, a Municipal Corporation, as Successor to Housing Assets of the Victorville Redevelopment Agency pursuant to that certain Corrective Notice of Agreement of Assignment executed by the Successor Agency to the Victorville Redevelopment Agency and City of Victorville, a Municipal Corporation, as Successor to Housing Assets of the Victorville Redevelopment Agency, dated June 22, 2016 and recorded on June 27, 2016 , in the Official Records as Instrument No. 2016-0252520.
Whereas, the undersigned present beneficiary desires to substitute a new Trustee under said Deed of Trust in place and instead of First American Title Company , a California corporation.
Now therefore, the undersigned hereby substitutes themselves as Trustee under said Deed of Trust and DOES HEREBY RECONVEY, without warranty, to the person or persons legally entitled thereto, all right, title and interest heretofore acquired and now
held by said City of Victorville, a Municipal Corporation, as Successor to Housing Assets of the Victorville Redevelopment Agency, in and to the portion of the real property located in San Bernardino County, State of California, and described as follows: See EXHIBIT A.
[REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK]
IN WITNESS WHEREOF, the CITY OF VICTORVILLE, a Municipal Corporation, as Successor to Housing Assets of the Victorville Redevelopment Agency , has caused its duly authorized representative to acknowledge this instrument.
CITY OF VICTORVILLE, a
Municipal Corporation, as
Successor to Housing
Assets of the Victorville
Redevelopment Agency
Date:_______________ By: _______________________
Keith C. Metzler,
City Manager
ATTEST:
By: __________________________________
Jennifer Thompson,
City Clerk
EXHIBIT A TO SUBSTITUTION OF TRUSTEE AND FULL RECONVENANCE
LEGAL DESCRIPTION
All that real property located in the City of Victorville, San Bernardino County, State of California described as follows:
LOT 90 OF TRACT 14114, IN THE CITY OF VICTORVILLE, COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 238 OF MAPS, PAGES 58 TO 62 INCLUSIVE, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY.
APN: 0395-471-52
15465 Amber Pointe Drive
VICTORVILLE, CA 92394
State of California
County of San Bernardino
On __________ , before me, , Personally appeared Date Name and Title of the Officer
who proved to me on the basis of satisfactory
Name(s) of Signer(s)
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature Place Notary Seal Above
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
Attachment B
Termination and Release of
Declaration of Covenants, Conditions, and Restrictions
and Notice of Affordability Restrictions
on Transfer of Property
RECORDING REQUESTED BY AND )
WHEN RECORDED MAIL TO: )
)
CITY OF VICTORVILLE )
DEPARTMENT OF ECONOMIC )
DEVELOPMENT )
14343 CIVIC DRIVE )
VICTORVILLE, CA 92392 )
RE: MAP # 08-08-08 )
Attn: Director of Economic Development )
________________________________________________________________________ SP
ACE ABOVE THIS LINE FOR RECORDER(S) USE
(EXEMPT FROM RECORDING FEES PURSUANT TO GOVERNMENT CODE SECTION 27383 and/or 6103) APN: 0395-471-52-0000
15465 Amber Pointe Drive
Victorville, CA 92394
TERMINATION AND RELEASE OF DECLARATION OF COVENANTS,
CONDITIONS AND RESTRICTIONS AND
NOTICE OF AFFORDABILITY RESTRICTIONS ON
TRANSFER OF PROPERTY
PLEASE TAKE NOTICE THAT the City of Victorville (the “City”), and the City’s Economic Development Department (“Economic Development”), are th e sole beneficiaries of that certain Declaration of Covenants, Conditions, and Restrictions executed by Economic Development on October 2, 2008 and recorded on October 10, 2008 as Instrument No. 2008-0455561 in the Official Records of San Bernardino County, California (the “Affordable Housing Restrictions”) , upon that certain real property identified in the Affordable Housing Restrictions and described in the attached Exhibit A (the “Property”). The Affordable Housing Restrictions were reco rded concurrently with the Notice of Affordability Restrictions on Transfer of Property, executed on October 2, 2008 by Economic Development and recorded on October 10, 2008 as Instrument No. 2008-0455562 in the Official Records of San Bernardino County, California (the “Notice of Affordability Restrictions on Transfer of Property”), attached as Exhibit B.
Pursuant to the terms of the Affordable Housing Restrictions, Economic Development shall execute a release of the encumbrances provided that the homeowner has repaid the MAP loan in full and remitted the equity share payment to the City of Victorville . As the preceding conditions have now been met, Economic Development hereby terminates the Af fordable Housing Restrictions and forever releases the encumbrances of the Affordabl e Housing Restrictions from the Property. Accordingly, the Notice of Affordability Restrictions on Transfer of Property is also terminated and released.
DAT
ED: _______________, 2023
TH
E ECONOMIC DEVELOPMENT DEPARTMENT OF THE CITY OF VICTORVILLE By:
Keith C. Metzler, City Manager
EXHIBIT A
TERMINATION AND RELEASE OF DECLARATION
OF COVENANTS, CONDITIONS AND RESTRICTIONS
PROPERTY LEGAL DESCRIPTION
All that real property located in the City of Victorville, San Bernardino County, State of California described as follows:
LOT 90 OF TRACT 14114, IN THE CITY OF VICTORVILLE, COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, AS PER MAP RECOR DED IN BOOK 238 OF MAPS,
PAGES 58 TO 62 INCLUSIVE, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY.
APN: 0395-471-52
15465 Amber Pointe Drive
Victorville, CA 92394
S
tate of California
County of San Bernardino
On __________ , before me, , Personally appeared Date Name and Title of the Officer
w ho proved to me on the basis of satisfactory
Name(s) of Signer(s)
evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature Place Notary Seal Above
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
Exhibit B
Notice of Affordability
Restrictions on Transfer of Property
Attachment C
Resolution No. CHAS 23-001
RESOLUTION NO. CHAS 23-001
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VICTORVILLE AS HOUSING ASSETS SUCCESSOR OF THE
VICTORVILLE REDEVELOPMENT AGENCY (“CHAS’)
AMENDING THE ANNUAL BUDGET FOR FISCAL YEAR 2022-
2023; APPROVING ADDITIONAL REVENUE
WHEREAS, the City Manager of the City of Victorville did heretofore submit to the City Council an estimate of the expenditures and revenues of the City departments and offices, together with a proposed budget for the fiscal year 2022-2023; and WHEREAS, copies of said budget were prepared and distributed to the City Council and approved by the City Council on June 21, 2022 and have been available for the inspection by the public in the office of the City Clerk of the City of Victorville; and WHEREAS, the City of Victorville Mortgage Assistance Program (MAP) was authorized and approved by the Victorville Redevelopment Agency on or around July 1997 to provi de assistance to very low, low, and moderate income homebuyers purchasing a home within the City of Victorville; and
WHEREAS, the Victorville Redevelopment Agency is now dissolved and the interest and functions of the former Victorville Redevelopment Agency have been assigned to the City of Victorville as Housing Assets Successor, pursuant to Resolution No. R-HF-16-001; and WHEREAS, the City of Victorville, as Successor to the Housing Assets of the Victorville Redevelopment Agency received repayment of the MAP loan issued to Amanda Streeter on September 25, 2008, MAP Case No. 08-08-08 in the amount of $58,348.00; and WHEREAS, a need to amend the budget is necessary to recognize the increase in budget revenue.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF VICTORVILLE DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That the annual budget for the fiscal year 2022-2023 for the City of Victorville be hereby amended to reflect an increase in budget revenue as shown below and as described in the corresponding agenda item dated February 21, 2023.
Account Amount Adjusted
205-18121-89023 (CHAS NR MAP) $25,538.00 (Principal)
2053080-45110-89023 (CHAS Interest Income) e) $32,810.00 (Interest) SECTION 2. That copies of such amended budget, certified by the City Clerk, shall be filed with the auditors of the City of Victorville and in the office of the City Clerk for public inspection and certified copies thereof shall be made available for use by the City departments, offices and subsidiary districts of the City.
Attachment D
Original Deed of Trust &
Promissory Note
EXHIBIT A TO DEED OF TRUST
TO PROMISSORY NOTE
Item Number: 16
City Council / Board of Directors
Written Communications
Meeting of: February 21, 2023
Submitted By:
Andre de Bortnowsky, City Attorney
Subject:
Adoption of proposed City Council Resolution No. 23-011 confirming increases to the Rate of Compensation for the Members of the Victorville Planning Commission Recommendation:
That the Honorable City Council:
(1) Review and Consider the Proposed Resolution Increasing the Victorville Planning Commission Rate of Compensation and Rescinding Resolution No. 06-156; and (2) Adopt Resolution No. 23-011
Fiscal Impact:
This will result in an increase in compensation from a maximum of $375 to $625 per month for members of the City of Victorville Planning Commission. Planning Commission meeting expense account 1004020-51140 has a budgeted amount of $11,000 for Fiscal Year 2022-2023 with $5,600 of the budget amount still available. Based on the projected Planning Commission meetings planned for the remainder of the fiscal year, an increase in the budget amount from $11,000 to $13,775 will be necessary during the upcoming Mid-Year Budget.
Background:
At the December 20, 2022 meeting, Councilmember Bob Harriman made a motion to bring an agenda item regarding Planning Commission stipends. The motion was seconded by Mayor Pro Tem Elizabeth Becerra and passed, with Councilmember Gomez voting “No”.
At the February 7, 2023 meeting, Mayor Debra Jones made a motion to increase the Victorville Planning Commission stipend to $400 for each regular meeting, $75 for each additional meeting, not to exceed $625 per month. The motion was seconded by Councilmember Bob Harriman and passed with Councilmember Gomez voting “No”. 3 0
0 9
Discussion:
The City Council has agreed to increase the Victorville Planning Commission Rate of Compensation as of the meeting of February 7, 2023. The prior compensation levels were set pursuant to Resolution No. 06-156, dated September 19, 2006. The proposed Resolution No. 23-011 confirms the Council’s decision to increase compensation levels as noted above and rescinds Resolution No. 06-156. The effective date of the compensation increase will be February 7, 2023, the date the City Council authorized the increase. The increase was justified based on the time and energy now required to prepare for and attend Planning Commission meetings.
Attachments: A. Resolution No. 23-011
Attachment A
RESOLUTION NO. 23-011
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VICTORVILLE RESCINDING RESOLUTION NO 06-156 AND INCREASING THE RATE OF
COMPENSATION FOR MEMBERS OF THE VICTORVILLE PLANNING
COMMISSION
WHEREAS, the City Council of the City of Victorville previously adopted Resolution No. 06- 156 establishing the rate of compensation for Planning Commissioners; and
WHEREAS, at the City Council meeting of February 7
th, 2023, the City
Council considered increasing t he Planning Commission compensation based on the amount of time and energy that is now required to serve as a Planning Commissioner for the City.
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF
VICTORVILLE DOES HEREBY RESOLVE AS FOLLOWS:
SECTION 1. The City Council of the City of Victorville has deemed it appropriate to increase compensation for the members of the Victorville Planning Commission based on the amount of time and energy it takes to serve as a Planning Commissioner for the City.
SECTION 2. The rate of compensation for each member of the Victo rville Planning Commission shall be Four Hundred Dollars ($ 400.00) for each regular meeting and Seventy-Five Dollars ($75.00) for each additional meeting, not to exceed Six Hundred Twenty-Five Dollars ($625.00) per month.
SECTION 3. Compensation for each member of the Victorville Planning Commission shall follow staff policy on all other reasonable expenditures incurred while in the performance of the duties of said Planning Commission.
SECTION 4. The effective date of commencing compensation for members of the Victorville Planning Commission as set forth in Section 2 shall be February 7 th, the date the City Council authorized increasing the Planning Commission compensation.
SECTION 5. Resolution No. 06-156 is hereby rescinded.
Item Number: 17
`
City Council / Board of Directors
Written Communications
Meeting of: February 21, 2023
Submitted By:
Brian Gengler, City Engineer
Subject:
Septic to Sewer Conversion Project – Purchase of Sewer Lift Station Recommendation:
That the Honorable City Council approve a General Services Provider Standard Agreement with ROMTEC Utilities for the design, fabrication, and delivery of a sewer lift station for the Willow Street Septic to Sewer Conversion Project, in an amount not to exceed $227,252.85.
Fiscal Impact:
This action will result in fiscal impact of $227,252.85. An additional appropriation is not required. Sufficient funds for these services were budgeted to cover the planned expenses. The account number, description, and the amount available are shown in table below:
Account Number Account Description Amount Available
4254500-55335-77438 Septic to Sewer
Conversion Project
$687,266.95
Strategic Plan Goal:
This item aligns with Goal E., Strategy 1 in the Strategic Plan, “Invest in Infrastructure” and “Implement the City’s Capital Improvement Program to meet community needs.” This project will result in investing in the City’s infrastructure expanding the sewer collection system. This project was included in the City’s capital improvement program to meet the community’s need for a reliable sewer collection system. 2 9
8 9
Background:
There were several sanitary sewer overflows (SSOs) from the City’s sewer collection system from March 2014 through June 2017. The Lahontan Regional Water Quality Board (Lahontan) issued an Administrative Civil Liability Complaint against the City related to these SSOs. In May of 2020, a settlement agreement between Lahontan and the City was approved which resulted in a $1,500,000 penalty. In accordance with the agreement, the City paid $750,000 to Lahontan.
The remaining $750,000 is being used for a Supplemental Environmental Project (SEP).
The City’s SEP is the Septic to Sewer Conversion Project within Old Town. The scope of this project involves connecting properties in the Old Town Specific Plan area which are currently on a septic system to the City’s sewer collection system. This SEP has a completion deadline of November 29, 2023, unless a time extension is granted by Lahontan. Staff has continued to work diligently to identify properties in the Old Town area which are not connected to City sewer; to date, only three properties have been identified.
In fact, investigations of the properties in Old Town have confirmed that nearly all the buildings are connected to sewer. After a building has been identified as not connected to City sewer, the property owner needs to sign an agreement to give the City’s contractor permission to perform the required work on the property. This work involves connecting the building to the City’s sewer system and removing the septic system. All the costs to connect a building to sewer will be paid by the City as part of this project. The costs include connecting to sewer; removing the septic system; City and VVWRA connection fees; City permit fees; and two years of the property owner’s monthly sewer bill after the connection has been made.
The first property to be identified with an onsite septic system was a church located at 16673 Avalon Avenue. This property was connected to the City sewer system using SEP funds, and the project was accepted as complete on October 10, 2022. The remaining two properties are single family homes which are on septic systems, and located at the end of Willow St., northeast of E St. Please refer to Attachment A, a location map.
Discussion:
The installation of sewer lift station will be required to be able to pump wastewater received from these two homes to the existing, relatively shallow, gravity sewer collection system within Willow Street. This lift station will be in a manhole with internal pumps which will pump wastewater through a pipe to an existing sewer manhole. From that manhole, the wastewater will flow into the City sewer collection system.
Engineering staff plans to use the same manufactured lift station design that has worked well at another location in the City for many years. In addition, a similar lift station designed and manufactured by ROMTEC Utilities is also being installed at the City’s Wellness Center within Old Town. Over the past few months, Engineering staff has been working with ROMTEC Utilities to finalize the design of the lift station. A preliminary design 2 9
8 9
has been reviewed by the Engineering staff to ensure that the lift station will operate and function as required.
Staff intends to use this vendor as a sole source to remain consistent with the other lift stations. Please refer to Attachment B, a sole source justification. ROMTEC Utilities is familiar with our scheduling needs to meet our construction deadline. The manufacturing of the lift station will take an estimated three months. This will satisfy the SEP deadline of November 29, 2023. ROMTEC Utilities submitted a price proposal which includes final design, manufacturing, and delivery which has been reviewed by Engineering staff. The price proposal is reasonable for the services to be provided by the vendor.
Staff recommends that the City Council approve a General Services Provider Agreement with ROMTEC Utilities for the purchase, manufacturing, and delivery of the sewer lift station for the Willow Street Septic to Sewer Conversion Project in an amount not to exceed $227,252.85. Please refer to Attachment C, the agreement.
Staff is available for any questions City Council may have.
Attachments: A. Location Map
B. Sole Source Justification
C. Agreement
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
1 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
GENERAL SERVICES PROVIDER STANDARD AGREEMENT
BY AND BETWEEN
THE CITY OF VICTORVILLE
AND
ROMTEC UTILITIES, INC.
FOR
FURNISH AND DELIVER WILLOW STREET SEPTIC CONVERSION
LIFT STATION, PROJECT NO. ESC23-089
THIS GENERAL SERVICES PROVIDER STANDARD AGREEMENT (hereinafter “Agreement”), is made and entered into by and between the City of Victorville , a municipal corporation located in the County of San Bernardino, State of California, hereinafter referred to as the “City”, and Romtec Utilities, Inc., a State of Oregon corporation, hereinafter referred to as “Service Provider .” City and Service Provider are sometimes hereinafter referred to individually as a “ Party” and collectively referred to as the “Parties.”
RECITALS:
WHEREAS, the City requires the manufacture of a Lift Station to be furnished and delivered in support of the Willow Street Septic Conversion; and
WHEREAS, such Lift Station is to be installed on the Project Site ( the “Site”) by an Independent General Contractor engaged by the City: and
WHEREAS, Service Provider is regularly engaged in the business of the off -site manufacture and fabrication of such Lift Stations, and by virtue of its experience is qualified to provide the manufactured Lift Stations required by the City; and
WHEREAS, in light of the facts set forth above, the City desires to retain the services of a qualified service provider to provide, on an independent contractor basis, the manufacture a Wastewater Lift Station to be furnished and delivered in support of the Victorville Wellness Center; and
NOW THEREFORE, IN CONSIDERATION OF THE COVENANTS, CONDITIONS, AND
PROMISES CONTAINED HEREIN AND FOR SUCH OTHER GOOD AND VALUABLE
CONSIDERATION, RECEIPT OF WHICH IS HEREBY ACKNOWLEDGED, THE PARTIES HERETO AGREE AS FOLLOWS:
Section 1. RECITALS
The Recitals set forth above are true and correct and are hereby incorporated into this Agreement by this reference, as though set forth fully herein.
Section 2. SCOPE OF SERVICES
Service Provider shall provide to the City those services set forth in the Scope of Services, attached hereto as Exhibit “A”, and incorporated as part of this Agreement by this reference.
2 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
Section 3. COMPENSATION
The City shall pay a total amount not to exceed Two Hundred Twenty-seven Thousand Two Hundred Fifty-two and 85 /100 DOLLARS ($227, 252.85) for the services rendered by Service Provider pursuant to this Agreement, subject to the provisions of Section 4.
Section 4. FEE SCHEDULE
The City shall pay Service Provider as provided in the Fee Schedule, attached hereto as Exhibit “B” and incorporated as part of this Agreement by this reference. The provisions of Exhibit “B” notwithstanding, in order to receive payments, Service Provider shall be required to submit to City monthly invoices detailing all services performed. Provided that services have been satisfactorily rendered, invoices shall be paid by the City approximately thirty (30) working days following receipt of Service Provider’s invoice.
Section 5. RESERVED
Section 6. TERM OF AGREEMENT
This Agreement shall be for an initial term of commencing on the date of full execution of the Agreement (the “Commencement Date”) and expiring on One Hundred Twenty Working Days from the Commencement Date (the “Termination Date”) (the “Term”) , unless terminated earlier pursuant to Section 21 of this Agreement. From and after the Termination Date, and upon subsequent agreement by the Parties , this Agreement may continue on a month-to-month basis until terminated pursuant to Section 21 below.
Section 7. INDEPENDENT CONTRACTOR STATUS
Service Provider shall at all times during the Initial Term of this Agreement , and (if applicable during any Option Periods), perform the services described in this Agreement as an independent contractor.
Section 8. REPRESENTATIONS AND ACKNOWLEDGMENTS
REGARDING INDEPENDENT CONTRACTOR’S STATUS OF
SERVICE PROVIDER
a. Service Provider represents and acknowledges the following:
(1) The City is not required to provide any training or legal counsel to Service Provider or its employees in order for Service Provider to perform the services described in this Agreement.
(2) Performance of the services described in this Agreement do not have to be integrated into the daily business operations of the City.
(3) The services described in this Agreement can be performed without the use of City equipment, materials, tools, or facilities, unless otherwise provided under a separate agreement.
(4) Nothing in this Agreement shall be interpreted to imply that the City must maintain any contractual relationship with Service Provider on a continuing basis after termination of this Agreement.
3 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
(5) The City will not be requested or demanded to assume any liability for the direct payment of any salary, wage, or other such compensation to any person employed by Service Provider to perform the services described in this Agreement.
(6) Service Provider shall not at any time or in any manner represent that it or any of its officers, employees, or agents are employees of the City. b. The City represents and acknowledges the following:
(1) Service Provider is solely responsible for determining who, under the supervision or direction of Service Provider, will perform the services set forth in this Agreement.
(2) The City will not hire, supervise , or pay any employees or assistants working for Service Provider pursuant to this Agreement. Nothing c ontained in this Agreement shall prevent the City from hiring Service Provider’s employees or assistants after termination of this Agreement.
(3) Nothing in this Agreement shall be interpreted to imply that Service Provider must maintain any contractual relationship with the City on a continuing basis after termination of this Agreement.
(4) It is the sole responsibility of Service Provider to set the hours in which Service Provider performs or plans to perform the services set forth in this Agreement.
(5) Service Provider is not required to devote full time to the business operations of the City in order to perform the services set forth in this Agreement.
(6) Unless deemed necessary under certain circumstances, Service Provider is not required to perform the services set forth in this Agreement at City Hall or on City -owned property.
(7) Nothing in this Agreement shall be interpreted to preclude Service Provider from working for other persons or firms, provided that such work does not create a conflict of interest.
Section 9. NOT AGENT OF THE CITY
a. Nothing contained in this Agreement shall be deemed, construed, or represented by the City or Service Provider or by any third person to create the relationship of principal and agent.
b. Service Provider shall have no authority, express or implied, to act on behalf of the City in any capacity whatsoever as an agent, nor shall Service Provider have any authority, express or implied, to bind the City to any obligation whatsoever.
Section 10. LICENSES AND PERMITS
Service Provider represents that it has obtained and will maintain at all times during the initial Term, and ( if applicable, during any Option Periods) of this Agreement all business licenses, including but not limited to a City of Victorville business license, certifications , or permits necessary for performing the services described in this Agreement.
4 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
Section 11. WARRANTY
Service Provider agrees to perform all services required by this Agreement in a workmanlike competent and satisfactory manner in accordance with the standards prevalent in the industry for such services.
Section 12. FAMILIARITY WITH WORK
Should Service Provider discover any latent or unknown conditions materially differing from those inherent in the services or as represented by the City , Service Provider shall immediately inform the City of such fact and shall not provide any services, except at Service Provider's risk, until written instructions are received from Brian Gengler, City Engineer, or his designee.
Section 13. CONFLICTS OF INTEREST
Service Provider covenants that it does not have any interest, nor shall it acquire any interest, directly or indirectly, which would conflict in any manner with the performance of Service Provider’s services under this Agreement. Service Provider further covenants that in the performance of services under this Agreement, no officer, employee or agent of Service Provider having such an interest shall be employed by it. In the event the City determines that Service Provider must disclose its financial interests by completing and filing a Fair Political Practices Commission Form 700, Statement of Economic Interests, Service Provider shall file such Form 700 with the City Clerk’s Office pursuant to the written instructions provided by the City Clerk.
Section 14. COMPLIANCE WITH LAWS
Service Provider shall comply with all local, state, and federal laws and regulations applicable to the services to be rendered hereunder, including any rule, regulation, or bylaw governing the conduct or performance of Service Provider or its employees, officers, or board members.
Section 15. COMMERCIAL GENERAL AND
AUTOMOBILE LIABILITY INSURANCE
a. Service Provider shall procure and maintain at its own expense, during the initial Term of this Agreement, and (if applicable, during any Option Periods), commercial general liability insurance, of not less than One Million Dollars ($1,000,000) per occurrence, and Two Million Dollars ($2,000,000) in the aggregate, for bodily injury, personal injury, death, loss , or damage resulting from the wrongful or negligent acts by Service Provider or its officers, employees, servants, volunteers, and agents and independent contractors.
b. Service Provider shall further procure and maintain, at its own expense, during the initial Term of this Agreement , and (if applicable, during any Option Periods) commercial vehicle liability insurance covering personal injury and property damage, of not less than One Million Dollars ($1 ,000,000) combined single limit , covering any vehicle utilized by Service Provider or its officers, employees, servants, volunteers , agents and independent contractors in performing the services required by this Agreement.
5 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
Section 16. WORKERS' COMPENSATION INSURANCE
a. Service Provider shall procure and maintain at its own expense, during the initial Term of this Agreement, and (if applicable, during any Option Periods), workers' compensation insurance, providing coverage as required by the California State Workers' Compensation Law.
b. If any class of employees employed by the Service Provider pursuant to this Agreement is not protected by the California State Workers' Compensation Law, Service Provider shall provide adequate insurance for the protection of such employees to the satisfaction of the City.
Section 17. RESERVED
Section 18. ADDITIONAL INSURED
Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, all insurance policies, except for the Workers' Compensation policy, shall be endorsed to name the City and its officers, employees, servants, volunteers, agents and independent contractors, including, without limitation, the City Attorney, as Additional Insureds.
Section 19. WAIVER OF SUBROGATION RIGHTS
Service Provider shall require the carriers of all required insurance policies to waive all rights of subrogation against the City and its officers, employees , servants, volunteers, agents, and independent contractors and subcontractors. Each policy of insurance shall be endorsed to reflect such waiver.
Section 20. PROOF OF INSURANCE COVERAGE;
REQUIRED ENDORSEMENTS
a. Service Provider shall secure from a good and responsible company or companies authorized to transact insurance business in the State of California, the policies of insurance required by this Agreement and furnish to the City Clerk certificates of insuranc e evidencing the required coverage, and policy endorsements at least one (1) business day prior to the commencement of any services to be performed under this Agreement.
b. The policies and certificates of insurance shall be endorsed to provide that in the event of cancellation or amendment of any required insurance policy for any reason whatsoever, the City shall be notified by mail, postage prepaid, not less than thirty (30) days before the cancellation or amendment is effective. In the case of cancellation for non-payment, ten (10) days advance written notice shall be given.
c. Each policy and certificate of insurance shall be endorsed to provide that the policy shall not be terminated or expire without first providing thirty (30) days written notice to the City of such termination or expiration.
d. Each policy and certificate of insurance shall be endorsed to provide that the policy will be maintained throughout the Initial Term, and (if applicable during any Option Periods) of this Agreement.
6 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
e. The commercial general liability and vehicle liability policies shall be endorsed to contain the following provision: “For any claims related to this Agreement, Service Provider’s coverage shall be primary with respect to the City. Any insurance maintained by the City shall be in excess of Service Provider’s insurance and shall not contribute with it.”
Section 21. TERMINATION OR SUSPENSION
a. This Agreement may be terminated or suspended without cause by either Party at any time, provided that the Party initiating the termination provides the other Party at least thirty (30) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of t his Agreement for satisfactory services rendered or supplies actually furnished prior to the effective date of termination.
b. This Agreement may be terminated or suspended with cause by either Party at any time, provided that the Party initiating termination provides the other Party at least ten (10) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory service s rendered or supplies actually furnished prior to the effective date of termination.
Section 22. TIME OF THE ESSENCE
Time is of the essence in the performance of this Agreement.
Section 23. INDEMNIFICATION
a. Service Provider shall defend, indemnify, and hold harmless the City, its officers, employees, representatives, and agents, from and against those actions, suits, proceedings, claims, demands, losses, costs, and expenses, including legal costs and attorney’s fees, for any personal injuries, deaths, or property damage (including property owned by the City), which may arise out of Service Provider's negligence or willful misc onduct in the performance of the services described in this Agreement, unless such losses or damages are proven to be caused by the City's own negligence or willful misconduct, or that of its officers or employees.
b. The City does not and shall not waive any rights that it may have against Service Provider under this Section, because of the acceptance by the City, or the deposit with the City, of any insurance policy or certificate required pursuant to this Agreement. The hold harmless and indemnification provisions of this Section shall apply regardless of whether said insurance policies are determined to be applicable to the claim, demand, damage, liability, loss, cost , or expense described herein.
Section 24. REPORTS
Upon request by Brian Gengler, City Engineer, or his designee, Service Provider shall prepare and submit reports to the City concerning Service Provider's performance of the services required by this Agreement.
7 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
Section 25. RECORDS
a. Service Provider shall keep such books and records as shall be necessary to perform the services required by this Agreement and enable Brian Gengler, City Engineer, or his designee, to evaluate the cost and the performance of such services.
b. Books and records pertaining to costs shall be kept and prepared in accordance with generally accepted accounting principles.
c. Brian Gengler, City Engineer, or his designee, shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit, and make records and transcripts from such records.
d. Records and supporting documents pertaining to the use of funds paid to Service Provider hereunder shall be retained by Service Provider and made available to Brian Gengler, City Engineer, or his designee, for purposes of performing an audit for a period of five (5) years from the date of termination of this Agreement.
Section 26. RESERVED
Section 27. CONFIDENTIALITY
a. Any and all documents and information obtained from the City or prepared by Service Provider for the City shall be kept strictly confidential unless otherwise provided by applicable law. All City data, documents and information shall be returned to City upon termination of the Agreement.
b. Any drawings, specifications, reports, records, documents , or other materials prepared by Service Provider in the performance of services under this Agreement shall not be released publicly without the prior written approval of Brian Gengler, City Engineer , or his designee, or as required by applicable law.
c. Service Provider shall not disclose to any other entity or person any information regarding the activities of the City, except with the prior written approval of Brian Gengler, City Engineer, or his designee, or as required by applicable law.
Section 28. PRINCIPAL REPRESENTATIVES
a. Dayna Lewis, Corporate Controller , is designated as the principal representative of Service Provider for purposes of communicating with the City on any matter associated with the performance of the services set forth in this Agreement.
b. Brian Gengler, City Engineer, or his designee, shall be the principal representative(s) of the City for purposes of communicating with Service Provider on any matter associated with the performance of the services set forth in this Agreement.
c. Either Party may designate another individual as its principal representative by giving written notice of such designation to the other Party.
8 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
Section 29. MODIFICATIONS AND AMENDMENTS
This Agreement may be modified or amended only by a written instrument signed by both Parties.
Section 30. ENTIRE AGREEMENT
a. This Agreement supersedes any and all prior or contemporaneous agreements, either oral or written, between the City and Service Provider with respect to the subject matter of this Agreement.
b. This Agreement contains all of the covenants and agreements between the Parties with respect to the subject matter of this Agreement, and each Party to this Agreement acknowledges that no representations, inducements, promises, or agreements have been made by or on behalf of any Party, except those covenants and agreements in this Agreement.
c. No agreement, statement, or promise with respect to the subject matter of this Agreement, which is not contained in this Agreement, or in a valid modification or amendment to this Agreement, shall be valid or binding on either Party.
Section 31. AMBIGUITIES
This Agreement is in all respects intended by each Party hereto to be deemed and construed to have been jointly prepared by the Parties and the Parties hereby expressly agree that any uncertainty or ambiguity existing herein shall not be interpreted against either of them.
Except as expressly limited by this paragraph, all of the applicable rules of interpretation of contract shall govern the interpretation of any uncertainty or ambiguity of this Agreement.
Notwithstanding the foregoing, the Parties agree that Exhibits “A” and “B” are attached hereto for reference purposes and to the extent there are any ambiguities, inconsistencies or conflicts between the terms of this General Services Provider Standard Agreement and Exhibits “A” and “B” the terms of this General Services Provider St andard Agreement shall control and nothing set forth in Exhibits “A” and “B” shall be deemed to supersede any of the provisions of this General Services Provider Standard Agreement.
Section 32. NOTICES
a. Any notice to be provided pursuant to this Agreement shall be in writing, and all such notices shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the Parties as follows:
To the City: Brian Gengler, City Engineer
Engineering Department
City of Victorville
14343 Civic Drive
Victorville, CA 92392
9 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
To Provider: Dayna Lewis, Corporate Controller
Romtec Utilities, Inc.
18240 North Bank Rd.
Roseburg, OR 97470
b. Notices, payments, and other documents shall be deemed delivered upon receipt by personal service or as of the second (2nd) day after deposit in the United States mail.
Section 33. NON-LIABILITY OF CITY OFFICERS
AND EMPLOYEES
No officer or employee of the City shall be personally liable to Service Provider, or any successor in interest, in the event of any default or breach by the City or for any amount , which may become due to Service Provider or to its successor (s), or for any breach of any obligation of the terms of this Agreement.
Section 34. REVIEW BY ATTORNEYS
Each Party hereto has had its attorney (s) review this Agreement and all related documents. Each Party hereto has consulted with its attorney (s) and has negotiated the terms of this Agreement based on such consultation.
Section 35. WAIVER
a. No waiver shall be binding unless executed in writing by the Party making the waiver.
b. No waiver of any provision of this Agreement shall be deemed, or shall constitute, a waiver of any other provision, whether similar, nor shall any such waiver constitute a continuing or subsequent waiver of the same provision.
c. Failure of either Party to enforce any provision of this Agreement shall not constitute a waiver of the right to compel enforcement of such provision or any of the remaining provisions of this Agreement.
Section 36. ASSIGNMENT
This Agreement shall not be assigned by either Party without prior written consent of the other Party.
Section 37. CARE OF WORK
The performance of services by Service Provider or the payment of money by the City shall not relieve Service Provider from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to the City, when such incomplete, inaccurate or defective work is due to the negligence of Service Provider.
10 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
Section 38. CAPTIONS AND HEADINGS
The captions and headings contained in this Agreement are provided for identification purposes only and shall not be interpreted to limit or define the content of the provisions described under the respective caption or heading.
Section 39. SUCCESSORS, HEIRS, AND ASSIGNS
Except as otherwise expressly provided herein, this Agreement shall be binding upon the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties to this Agreement and, likewise, shall inure to the benefit of the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties.
Section 40. GENDER
In this Agreement, unless the context clearly requires otherwise, the masculine, feminine and neuter genders and the singular and the plural shall include one another.
Section 41. SEVERABILITY
If any one or more of the sentences, clauses, paragraphs , or sections contained herein is declared invalid, void, or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair , or invalidate any of the remaining sentences, clauses, paragraphs, or sections contained herein.
Section 42. GOVERNING LAW
The validity of this Agreement and any of its terms or provisions, as well as the rights and duties of the Parties under this Agreement, shall be construed pursuant to and in accordance with California law.
Section 43. DEFAULT
a. Failure or delay by any Party to this Agreement to perform any material term or provision of this Agreement shall constitute a default under this Agreement; provided however, that if the Party who is otherwise claimed to be in default by the other Party commences to cure, correct, or remedy the alleged default within fifteen (15) days after receipt of written notice specifying such default and shall diligently complete such cure, correction, or remedy, such Party shall not be deemed to be in default hereunder.
b. The Party claiming that a default has occurred shall give written notice of default to the Party in default, specifying the alleged default. Delay in giving such notice shall not constitute a waiver of any default nor shall it change the time of default; provided, however, the injured Party shall have no right to exercise any remedy for a default hereunder without delivering the written default notice, as specified herein.
c. Any failure or delay by a Party in asserting any of its rights or remedies as to any default shall not operate as a waiver of any default or of any rights or remedies associated with a default.
11 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
d. In the event that a default by any Party to this Agreement may remain uncured for more than fifteen (15) days following written notice, as provided above, the injured Party shall be entitled to seek any appropriate remedy or damages by initiating legal proceedings.
Section 44. CUMULATIVE REMEDIES
Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the Parties are cumulative and the exercise by either Party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default of any other default by the other Party.
Section 45. VENUE
All proceedings involving disputes over the terms, provisions, covenants , or conditions contained in this Agreement and all proceedings involving any enforcement action related to this Agreement shall be initiated and conducted in the applicable court or forum in San Bernardino County, California.
Section 46. A TTORNEYS’ FEES
In the event any action, suit , or proceeding is brought for the enforcement of, or the declaration of any right or obligation pursuant to this Agreement , or as a result of any alleged breach of any provision of this Agreement, the prevailing Party in such suit or proceeding shall be entitled to recover its costs and expenses, including reasonable attorneys ’ fees, from the losing Party, and any judgment or decree rendered in such a proceeding shall include an award thereof.
Section 47. EFFECTIVENESS OF AGREEMENT
This Agreement shall not be binding upon the City, until signed by the authorized representative(s) of Service Provider, approved by the City’s Risk Manager, and executed by the authorized City personnel or Mayor.
Section 48. REPRESENTATIONS OF PARTIES AND
PERSONS EXECUTING AGREEMENT
a. Each of the Parties to this Agreement hereby represents that all necessary and appropriate actions of their governing bodies have been taken to make this Agreement a binding obligation of each of the Parties hereto.
b. The persons executing this Agreement warrant that they are duly authorized to execute this Agreement on behalf of and bind the Parties each purports to represent.
Section 49. COUNTERPARTS
This Agreement may be executed by the Parties in counterparts, and when executed by each of the Parties, each counterpart shall be deemed to be a part of this Agreement.
(END OF THIS PAGE)
12 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed as of the dates written below.
T
HE CITY OF VICTORVILLE ROMTEC UTILIES, INC.
B
y: ______________________________ By: _____________________________ Debra Jones, Dayna Lewis,
Mayor Corporate Controller
D
ated: ___________________________ Dated: __________________________ A
TTEST
B
y:_______________________________
Jennifer Thompson,
City Clerk
D
ated:_____________________________
T
HE CITY OF VICTORVILLE APPROVED AS TO STANDARD FORM:
B
y: ______________________________ By: _____________________________ Andre de Bortnowsky, John Preston,
Risk Manager City Attorney
D
ated: ___________________________ Dated: _________________________ 13 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
EXHIBIT A
SCOPE OF SERVICES
See Attachment
EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
14/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
15/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
16/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
17/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
18/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
19/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
20/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
21/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
22/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
23/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
24/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT A, SCOPE OF SERVICES, PROJECT ESC23-089
25/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 26 General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089
EXHIBIT B
F
EE SCHEDULE
S
ee Attachment
EXHIBIT B, FEE SCHEDULE, PROJECT ESC23-089
27/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT B, FEE SCHEDULE, PROJECT ESC23-089
28/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT B, FEE SCHEDULE, PROJECT ESC23-089
29/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT B, FEE SCHEDULE, PROJECT ESC23-089
30/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 EXHIBIT B, FEE SCHEDULE, PROJECT ESC23-089
31/General Services Provider Standard Agreement/Romtec Utilities, Inc., Project No. ESC23-089 Item Number: 18
City Council / Board of Directors
Written Communications
Meeting of: February 21, 2023
Submitted By:
Joe Slegers, Building Official
Subject:
Award of Contract to LM Rasmussen Construction for the Exeloo Automatic Restrooms Installation at Brentwood and Center Street Parks, Project CC23-079 Recommendation:
That the Honorable City Council award a Construction Agreement to LM Rasmussen Construction in the amount of $184,843.00 for the Exeloo Automatic Restroom Installation at Brentwood and Center Street Parks, Project CC23-079.
Fiscal Impact:
Acting in accordance with the staff recommendation will result in a fiscal impact of $184,843.00. This project was approved and included in the Fiscal Year 2022/2023 annual budget and will be funded by ARPA per the summary below:
Fund Account Balance Expenditure
ARPA 2770010-55060-97074 $425,350.00 $184,843.00
Strategic Plan Goal:
The City of Victorville Strategic Plan 2020-2023 identifies multi-year strategic goals and various strategies to work toward achieving those goals. Goal E, Invest in Infrastructure, focuses on creating a healthy and livable community by maintaining the city’s assets through investment in infrastructure and innovations. Through this project, the City is able to satisfy two strategies within Goal E; Strategy 1 - Implementation of the city's Capital Improvement Program to meet the community needs, and Strategy 8 - Complete the Parks and Recreation Master Plan and determine priorities for implementation.
Background:
In 2019, the City completed an ADA accessibility self-assessment. It was identified that some city park restrooms have ADA accessibility deficiencies. The City has been working to address these issues and many others each year. At the September 20, 2022 City Council meeting, Council unanimously approved the purchase of the Exeloo Automatic Public Restrooms for both Center Street and Brentwood Parks. The Exeloo Automatic 3 0
0 2
Restroom is designed to provide all the features essential for bringing our restrooms up to code and within ADA compliance.
The demolition of the Center Street Park restroom was completed in June 2022. Staff developed a plan to demolish the existing building at Center Street Park due to many aspects of the building not complying with ADA standards as identified in the City’s Transition Plan. The age of the building and the unrepairable nature of the masonry structure made it difficult to modify the existing restrooms to bring them into compliance.
Brentwood Park is one of three parks within the city limits that does not have restroom facilities available. The absence of a restroom in itself, is an ADA accessibility deficiency.
In addition, as identified by in the Parks Master Plan, it is the City’s goal to provide clean, safe, and accessible restroom facilities for the community to use at all city parks.
Once the installation of the automatic restrooms is complete, restrooms at these locations will be up to code and fully ADA compliant.
Discussion:
Staff has worked with a civil engineer to develop a plan that lays out the required grading, utility, and site work, and recently received the Department of Housing and Community Development (HCD) approved plans for the Exeloo Automatic Restrooms (Attachment B). This enabled us to solicit a Notice Inviting Bids for the installation of these restrooms at Center Street and Brentwood Parks.
On January 12, 2023, the Notice Inviting Bids was posted on Ebidboard.com and the City’s website. A mandatory pre-bid meeting and job walk were held on January 26, 2023, and bids were due by February 9, 2023. The following bids were received:
Contractor Location Bid
LM Rasmussen Construction Alpine, CA $184,843.00
RE Chaffee Construction Phelan, CA $274,999.00
Jergensen Construction Oak Hills, CA $294,944.00
CA Landscape Los Angeles, CA $363,000.00
CS Legacy Construction Pomona, CA $374,605.00
MLC Constructors Corona, CA $434,915.00
After review and tabulation of the bid proposals, it was determined that LM Rasmussen Construction is the lowest responsive and responsible bidder. Staff recommends that the City Council award a construction agreement (Attachment C) to LM Rasmussen Construction for the Installation of Exeloo Automatic Restrooms at Brentwood and Center Street Parks, Project CC23-079, in the amount of $184,843.00.
Staff is available for questions.
Attachments: A – Photos
B – Construction Documents
C – Construction Agreement
Attachment A
Brentwood Park Restroom Location
Center Street Park Restroom Location
Attachment B
IN THE CITY OF VICTORVILLE, COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIAPRECISE GRADING PLAN
INDEX OF DRAWINGS
BRENTWOOD PARK
VICINITY MAP
APPLICANT/OWNER:
SELF-CLEANING RESTROOMS
SITEHOOK
PROJECT ESC22-077
INTERIM EROSION CONTROL NOTE:UNAUTHORIZED CHANGES AND USES:
ENGINEER'S NOTICE TO CONTRACTOR:
UTILITY PURVEYORSLEGEND
8885 Haven AvenueSuite 195
united engineering groupPhone: 909.466.9240Rancho Cucamonga, CA 91730www.unitedeng.com REVISIONSDESCRIPTIONNO. APPROVEDDATE8-1-1 IN THE CITY OF VICTORVILLE, CA.
CA-30226BRENTWOOD PARKSELF-CLEANING RESTROOMSPROJECT ESC22-077PRECISE GRADING PLANCITY OF VICTORVILLEENGINEERING DEPARTMENT14343 Civic Drive, Victorville, CA 92392 (760) 955-5000CITY CASE NO.
DATEBrian W. Gengler, RCE C44730City EngineerApproved By:
BOULEVARD
MOJAVE DRIVE
SENECA ROAD
RENO LOOP RD N
RENO LOOP RD W
RENO LOOP RD E
AMETHYST ROADEL EVADO ROAD
BRENTWOODPARK
LOCATION
HOOKBLVDGRAY LANE
DAPPLE COURT
BUCKSKIN COURT
CONSTRUCTION NOTES: QUANTITY ESTIMATEDETAIL-PRECISE GRADING PLAN:
SEE DETAILRIGHT HEREON
NOTE "A":
8885 Haven AvenueSuite 195
united engineering groupPhone: 909.466.9240Rancho Cucamonga, CA 91730www.unitedeng.com REVISIONSDESCRIPTIONNO. APPROVEDDATE8-1-1 IN THE CITY OF VICTORVILLE, CA.
CA-30226BRENTWOOD PARKSELF-CLEANING RESTROOMSPROJECT ESC22-077PRECISE GRADING PLANCITY OF VICTORVILLEENGINEERING DEPARTMENT14343 Civic Drive, Victorville, CA 92392 (760) 955-5000CITY CASE NO.
DATEBrian W. Gengler, RCE C44730City EngineerApproved By:
GENERAL PROJECT LOCATION: NOTE "B":
8885 Haven Avenue
Suite 195
united engineering group
Phone: 909.466.9240
Rancho Cucamonga, CA 91730
www.unitedeng.com
REVISIONS
DESCRIPTIONNO. APPROVEDDATE
8-1-1
IN THE CITY OF VICTORVILLE, CA.
CA-30217
CENTER STREET PARK
SELF-CLEANING RESTROOMS
PROJECT ESC22-077
PRECISE GRADING PLAN
CITY OF VICTORVILLE
ENGINEERING DEPARTMENT
14343 Civic Drive, Victorville, CA 92392 (760) 955-5000 CITY CASE NO.
DATEBrian W. Gengler, RCE C44730
City Engineer
Approved By:
IN THE CITY OF VICTORVILLE, COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA
PRECISE GRADING PLAN
INDEX OF DRAWINGS
CENTER STREET PARK
VICINITY MAP
APPLICANT/OWNER:
SELF-CLEANING RESTROOMS
18 15
15 6TH STREET
7TH STREET
4TH STREET
"D" STREET
HESPERIA ROAD11TH STREET
VERDE STREET
MOJAVE DRIVE
CENTER STREET
MERRILL STREET
LACY STREET
SITE LOCATION
FORREST AVE
"A" STREET
PROJECT ESC22-077
INTERIM EROSION CONTROL NOTE:
UNAUTHORIZED CHANGES AND USES:
ENGINEER'S NOTICE TO CONTRACTOR:
UTILITY PURVEYORSLEGEND
CL
CENTER STREET
CL
MERRILL
STREET
8885 Haven Avenue
Suite 195
united engineering group
Phone: 909.466.9240
Rancho Cucamonga, CA 91730
www.unitedeng.com
REVISIONS
DESCRIPTIONNO. APPROVEDDATE
8-1-1
IN THE CITY OF VICTORVILLE, CA.
CA-30217
CENTER STREET PARK
SELF-CLEANING RESTROOMS
PROJECT ESC22-077
PRECISE GRADING PLAN
CITY OF VICTORVILLE
ENGINEERING DEPARTMENT
14343 Civic Drive, Victorville, CA 92392 (760) 955-5000 CITY CASE NO.
DATEBrian W. Gengler, RCE C44730
City Engineer
Approved By:
CONSTRUCTION NOTES: QUANTITY ESTIMATE
EXISTING FEATURES AND REMOVAL PLAN: PRECISE GRADING PLAN: LACY STREET
NOTE "A":
[1]IntertekisabrandnamerepresentingtheIntertekGroupplclegalentities,includingbutnotlimitedto,IntertekTestingServicesNAInc., ProfessionalServiceIndustries,Inc.(“INTERTEKͲPSI”),ArchitecturalTestingInc.(“INTERTEKͲATI”),andMTGroupInc.(“INTERTEKͲMT)
www.intertek.com/building
IntertekͲATI
174833rdStreet
Orlando,Florida32839
FLEngineeringBusiness#3684
Tel+1407.304.5560
Fax+1407.304.5561
intertek.com
November15,2022
Mr.JohnWestfall
ManufacturedHousing/FactoryBuiltHousing
DivisionofCodesandStandards
CADepartmentofHousing&CommunityDevelopment
POBox278180/Sacramento,CA95827Ͳ8180(Mailing)
RE: Exeloo
FactoryBuiltHousingProgram
Approval#RͲ20690
ExpirationDate–02Ͳ14Ͳ2024
DearMr.Westfall:
ArchitecturalTesting,Inc.(IntertekͲATI,Inc.),partofIntertekBuildingScienceSolutions,hascompleted an engineering code review for the aboveͲreferenced document(s) for compliance with all applicable codes,asevidencedbyth
e Intertek,Inc.approvalstamponeachpage.ThisapprovalcoversthefactoryͲ built structure only—any alterations to the factoryͲbuilt structure onͲsite void the approval. Items installedonͲsitearesubjecttoreviewandapprovalbythelocalauthority.Asetofsignedandsealedplans areonfilewithIn tertek andtheclient.
Pleasegetintouchwithourofficeifyoushouldneedfurtherinformationorassistance.Thankyou.
Respectfullysubmitted,
WilliamTegeler
PlanReviewManager
BuildingScienceSolutions
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Approved for Commercial
Approved by: St ate of California
MH DAA #DM1507408
Intertek (Intertek-ATI)
Plan Approval: #R-206 90
Approval Date: 11/15/2022
Expiration Date: 02/1 4/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Richard Donarski – CMI Don Grehan – Unrestricted Building Certifier Date of issue: 03/06/2022
Date of expiry: 23/03/2024
Certificate number: CM40183 Rev2 This certificate is only valid when reproduced in its entirety. Page 1 of 6 Certification Body:
ABN: 80 111 217 568
JAS-ANZ Accreditation
No. Z4450210AK
PO Box 7144, Sippy
Downs Qld 4556
+61 (07) 5445 2199
www.CertMark.org
Certificate Holder:
MMetecnoo Ptyy Ltdd
T/A Metecno,
Bondor®
ABN: 44 096 402 934
103 Ingram Road,
Acacia Ridge Qld 4110
Ph: +61 7 3323 8555
www.bondor.com.au
Certificate number: CM40183 Rev2
THIS IS TO CERTIFY THAT
MetecnoSpan®
Type and/or use of product:
Insulated roof/ceiling or wall panel.
Description of product:
MetecnoSpan® is an insulated roof/ceiling or wall panel that features an outer steel faces and a PIR (Polyisocyanurate) core. Refer A2 for details.
COMPLIES WITH THE FOLLOWING BCA PROVISIONS AND STATE OR TERRITORY VARIATION(S) BCA 2019 (Amdt. 1) Volume One Volume Two
Performance Requirement(s): BP1.1(a)&(b)(i),
(ii)&(iii)
Structural reliability P2.1.1(a),(b)(i),
(ii)&(iii)
Structural stability and resistance to actions
P2.2.2 Weatherproofing – Limited to roof applications only. Refer Limitations & Conditions No. 8.
Deemed-to-Satisfy Provision(s): C1.10(a)(ii) Fire Hazard Properties – Refer A3. 3.12.1.2 Energy Efficiency – Roofs. Can be used in conjunction with other building elements to achieve a Total R Value. Refer to A3.
F1.5 Weatherproofing – Limited to roof applications only. 3.12.1.4 Energy Efficiency – External Walls. Can be used in conjunction with other building elements to achieve a Total R Value. Refer to A3.
J1.3 Energy Efficiency – Roof and ceiling construction. Can be used in conjunction with other building elements to achieve a Total R Value. Refer to A3.
3.12.1.6 Energy Efficiency – Attached Class 10a buildings. Can be used in conjunction with other building elements to achieve a Total R Value. Refer to A3.
J1.5 Energy Efficiency – Wall construction. Can be used in conjunction with other building elements to achieve a Total R Value. Refer to A3.
State or territory variation(s): Not Applicable Part 3.12 (NSW, NT, SA, Qld, Tas, ACT)
SUBJECT TO THE FOLLOWING LIMITATIONS AND CONDITIONS AND THE PRODUCT TECHNICAL DATA IN APPENDIX A AND EVALUATION STATEMENTS IN APPENDIX B RiRRR h d D ki
CMI
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Certificate number: CM40183 Rev2 This certificate is only valid when reproduced in its entirety. Page 2 of 6
Limitations and conditions:
1. This product has not been subject to AS 1530.1-1994 (R2016) testing and cannot be considered to be a non-combustible material.
2. BCA requires certain external walls, common walls or internal load bearing walls and/or ancillary elements of some Class 2 to 9 buildings to be non-combustible. In the absence of site-specific performance solution, this product or system is not suitable for use in these applications where a non-combustible product is required.
3. In the absence of a site-specific performance solution, this product or system must not be used to facilitate the exemptions for a carport specified in Part 3.7.2.6 Open carports of Volume 2 of the BCA 2019.
4. When used as internal wall and ceiling linings, this product as a Group 1 or Group 2 fire rated product, must comply with the group number specified in Table 3 of Specification C1.10 of the BCA Volume 1, 2019 Amendment 1. The Group numbers have been determined in accordance with testing conducted to AS ISO 9705 and assessment against AS 5637.1:2015 as either Group 2 or Group 1 depending on the construction detail, refer A3.
5. The structural support members are designed and engineered separately as per project requirements by building designers and engineers.
6. The size and location of any penetration through the MetecnoSpan® roof panels must be in accordance with Drawing PIR13-RP01-00 ROOF PENETRATIONS - METECNOSPAN - R0. Penetrations for flues, chimneys or exhaust of hot products of combustion are outside the scope of this certificate and require site-specific solutions. Contact Certificate Holder for site-specific solutions.
7. The MetecnoSpan® roof and wall panels will be limited by wind load shown in the manufacturer’s specifications on the span certified for the product type, thickness, core density and fixing configuration as per the product’s certified span tables referenced in A3.
8. The weatherproofing requirements of P2.2.2 in relation to external walls, including openings around windows and doors, do not form part of this Certificate of Conformity.
9. It is the responsibility of the building designer to ensure fitness for purpose including, but not limited to, consideration for the corrosion resistance level of the product and the proximity to breaking surf.
10. The use of the certified product/system is subject to these Limitations and Conditions and must be read in conjunction with the Scope of Certification below.
Building classification/s:
Class 1,2,3,4,5,6,7,8,9 & 10
Scope of certification: The CodeMark Scheme is a building product certification scheme. The rules of the Scheme are available at the ABCB website www.abcb.gov.au. This Certificate of Conformity is to confirm that the relevant requirements of the Building Code of Australia (BCA) as claimed against have been met. The responsibility for the product performance and its fitness for the intended use remain with the Certificate Holder. The certification is not transferrable to a manufacturer not listed on Appendix A of this certificate.
Only criteria as identified within this Certificate of Conformity can be used for CodeMark certification claims. Where other claims are made in a client’s Installation Manual, Website or other documents that are outside the criteria on this Certificate of Conformity, such criteria cannot be used or claimed to meet the requirements of this CodeMark certification.
The NCC defines a Performance Solution as one that complies with the Performance Requirements by means other than a Deemed-to-Satisfy Solution. A Building Solution that relies on a CodeMark Certificate of Conformity that certifies a product against the Performance Requirements cannot be considered as Deemed-to-Satisfy Solution.
This Certificate of Conformity may only relate to a part of a Performance Solution. In these circumstances other evidence of suitability is needed to demonstrate that the relevant Performance Requirements have been met. The relevant provisions of the Governing Requirements in Part A of the NCC will also need to be satisfied.
This Certificate of Conformity is issued based on the evidence of compliance as detailed herein. Any deviation from the specifications contained in this Certificate of Conformity is outside of this document’s scope and the installation of the certified product will not be covered by this Certificate of Conformity. This may result in the product being classified as a non-conforming building product.
Disclaimer: The Scheme Owner, Scheme Administrator and Scheme Accreditation Body do not make any representations, warranties or guarantees, and accept no legal liability whatsoever arising from or connected to, the accuracy, reliability, currency or completeness of any material contained within this certificate; and the Scheme Owner, Scheme Administrator and Scheme Accreditation Body disclaim to the extent permitted by law, all liability (including negligence) for claims of losses, expenses, damages and costs arising as a result of the use of the product(s) referred to in this certificate.
When using the CodeMark logo in relation to or on the product/system, the Certificate Holder makes a declaration of compliance with the Scope of Certification and confirms that the product is identical to the product certified herein. In issuing this Certificate of Conformity, CertMark International has relied on the experience and expertise of external bodies (laboratories and technical experts).
Nothing in this document should be construed as a warranty or guarantee by CMI, and the only applicable warranties will be those provided by the Certificate Holder.
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Certificate number: CM40183 Rev2 This certificate is only valid when reproduced in its entirety. Page 3 of 6
APPENDIX A – PRODUCT TECHNICAL DATA
A1 Type and intended use of product
As per page 1.
A2 Description of product
Core PIR (Polyisocyanurate)
Source: Certificate Holder
Width (cover mm) 1000
Thickness (mm) 40, 60, 80 & 100
Length Up to 25m
External Material 0.42mm Colorbond® steel
Internal Material 0.5mm G300 Colorbond® steel
Pitch 2° Minimum
A3 Product specification
Structure &
Weatherproofing
In order to maintain compliance with structure, the following Span Tables must be referred to which have been certified by a licensed Professional Engineer in accordance with AS 1562.1, AS/NZS 1170.0, AS/NZS 1170.1, AS/NZS 1170.2, AS 4055 & AS 4040.1.
Span Tables
Document Name Version
METECNOSPAN® SPAN TABLES FOR WIND REGION A – NON-CYCLONIC (EXTERNAL ROOF APPLICATIONS ONLY) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 6 METECNOSPAN® SPAN TABLES FOR WIND REGION B – NON-CYCLONIC (EXTERNAL ROOF APPLICATIONS ONLY) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 6 METECNOSPAN® SPAN TABLES FOR WIND REGION C – CYCLONIC (EXTERNAL ROOF APPLICATIONS ONLY) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 5 METECNOSPAN® SPAN TABLES FOR WIND REGION D – CYCLONIC (EXTERNAL ROOF APPLICATIONS ONLY) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 5 METECNOSPAN® SPAN TABLES FOR WIND REGION A – NON-CYCLONIC (EXTERNAL ROOF APPLICATIONS ONLY WITH 25kg DEAD LOAD) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 5 METECNOSPAN® SPAN TABLES FOR WIND REGION B – NON-CYCLONIC (EXTERNAL ROOF APPLICATIONS ONLY WITH 25kg DEAD LOAD) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 5 METECNOSPAN® SPAN TABLES FOR WIND REGION C – CYCLONIC (EXTERNAL ROOF APPLICATIONS ONLY WITH 25kg DEAD LOAD) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 4 METECNOSPAN® Roof Span Table for Housing Application 5
METECNOSPAN® SPAN TABLES FOR WIND REGION A – NON-CYCLONIC (EXTERNAL WALL APPLICATIONS ONLY) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 1 METECNOSPAN® SPAN TABLES FOR WIND REGION B – NON-CYCLONIC (EXTERNAL WALL APPLICATIONS ONLY) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 1 METECNOSPAN® SPAN TABLES FOR WIND REGION C – NON-CYCLONIC (EXTERNAL WALL APPLICATIONS ONLY) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 1 METECNOSPAN® SPAN TABLES FOR WIND REGION D – NON-CYCLONIC (EXTERNAL WALL APPLICATIONS ONLY) PIR Core 0.42mm hi-tensile / 0.5mm steel skins 1 Penetrations
In order to maintain compliance with structure, the following document must be referred to which have been certified by a licensed Professional Engineer; Drawing PIR13-RP01-00 ROOF PENETRATIONS - METECNOSPAN - R0. The adequacy of the size, location and spacing of any penetrations outside the scope of this document through the MetecnoSpan® panel must be confirmed by a structural engineer.
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Certificate number: CM40183 Rev2 This certificate is only valid when reproduced in its entirety. Page 4 of 6
Material Group
Numbers
Group Numbers have been determined in accordance with testing conducted to AS ISO 9705:2003 (R2016) and assessment against AS 5637.1:2015.
Group 1 – Panels 40mm to 100mm thick
x Wall Panel to Wall Panel corner junction - Colorbond 40 x 40 x 0.6 mm thick steel angles, with Ø4 mm steel rivets at 300 mm centres x Wall Panel to Ceiling Panel junction - Colorbond 40 x 40 x 0.6 mm thick steel angles with 10 mm return crush fold, fixed horizontally along all ceiling-to-wall panel junctions with Ø4 mm steel rivets at 300 mm centres.
Smoke Growth Rate Index (SMOGRARC) 3.7 m2/s2 x 1000
Source: BRANZ Report No. FC14196-01 Issue 1 dated 04/03/2022 Group 2 – Panels 40mm to 100mm thick
x Wall Panel to Wall Panel corner junction - 100 x 100 mm steel angle fixed with 4 mm steel rivets at 200 centres. x Wall Panel to Ceiling Panel junction - 100 x 100 mm steel angle fixed with 4 mm steel rivets at 200 centres.
Smoke Growth Rate Index (SMOGRARC) = 21.1 m2s-2 x 1000
Source: Ignis Report No. IGNS-5396 Issue 2 Revision 1 dated 07/10/2019 Group 2 – Panels 40mm to 100mm thick
x Wall Panel to Wall Panel corner junction
Internal - 40 x 40 x 1.5mm aluminium angle fixed with aluminium 5/32nd gauge 17mm long pop rivets at 300 centres.
External - 70 x 40 x 1.5mm aluminium angle flashing the external corner fixed with aluminium 5/32nd gauge 17mm long pop rivets at 300 centres. x Wall Panel to Ceiling Panel junction
Internal - 40 x 40 x 1.5mm aluminium angle fixed aluminium 5/32nd gauge 17mm long pop rivets at 300 centres.
External - 70 x 40 x 1.5mm aluminium angle flashing the external corner fixed with aluminium 5/32nd gauge 17mm long pop rivets at 300 centres.
Smoke Growth Rate Index (SMOGRARC) = 47 m
2s-2 x 1000
Source: Ignis Report No. IGNS-5396 Issue 2 Revision 1 dated 07/10/2019 Thermal & Energy
Efficiency
Declared & Total R-values for Nominal Sizes of MetecnoSpan® – ROOFS Thickness (mm) ʄ declared at 23°C (W/m.K) R declared at 15°C (m2K/W) R declared at 23°C(m2K/W) Total R-value (m2K/W) at 6°C 15°C 30°C
40 0.023 1.95 1.85 2.20 2.10 2.00
60 0.023 2.90 2.75 3.20 3.05 2.87
80 0.023 3.80 3.65 4.19 4.00 3.74
100 0.023 4.75 4.55 5.18 4.94 4.61
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Certificate number: CM40183 Rev2 This certificate is only valid when reproduced in its entirety. Page 5 of 6
Declared & Total R-values for Nominal Sizes of MetecnoPanel® – WALLS Thickness (mm) ʄ declared at 23°C (W/m.K) R declared at 15°C (m2K/W) R declared at 23°C(m2K/W) Total R-value (m2K/W) at 6°C 15°C 30°C
40 0.023 1.95 1.85 2.21 2.11 1.96
60 0.023 2.90 2.75 3.21 3.06 2.83
80 0.023 3.80 3.65 4.20 4.01 3.70
100 0.023 4.75 4.55 5.19 4.95 4.57
Notes:
x Declared R-values are Product R-values and exclude air film resistances. x Total R-values include default air film resistances for the applications. x The results are compliant with AS/NZS 4859 Parts 1&2:2018, Thermal insulation materials for buildings, hence they are compliant with NCC 2019 Volumes One and Two.
Source: James Fricker Report No. i265e dated 15/12/2020.
A4 Manufacturer and manufacturing plant(s)
This field is optional. Contact Certificate Holder for manufacturing locations.
A5 Installation requirements
Installation requirements are outside the scope of this certificate and subject to project specific engineering advice. The minimum fixing requirements are outlined in the Span Tables referenced in A3 of this Certificate of Conformity.
A6 Other relevant technical data
Acoustic Performance 40mm MetecnoSpan® panel achieved R W 25, C -2 & Ctr -3
100mm MetecnoSpan® panel achieved RW 24, C -1 & Ctr -3
Source: CSIRO Report No. TL484 dated March 2008.
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Certificate number: CM40183 Rev2 This certificate is only valid when reproduced in its entirety. Page 6 of 6
APPENDIX B – EVALUATION STATEMENTS
B1 Evaluation methods
1. Fire Safety Provisions – A5.2(1)(d)&(e). Reports from Accredited Testing Laboratories and a professional engineer.
2. Structural Provisions – A5.2(1)(d)&(e). Reports from Accredited Testing Laboratories and a professional engineer.
3. Thermal Provisions – A5.2(1)(e). Reports from a professional engineer.
4. Weatherproofing Provisions – A5.2(1)(e). Reports from a professional engineer.
B2 Reports
1. Bligh Tanner; Reference No. 2017.0493; Certification of MetecnoSpan® Panel Span Tables in accordance with AS 1562.1, AS/NZS 1170.0, AS/NZS 1170.1, AS/NZS 1170.2, AS 4055 & AS 4040.1; Dated 26/03/2021.
2. BRANZ; Reference No. FC14196-01 Issue 2; Group number classification of MetecnoPanel®, MetecnoInspire® and MetecnoSpan® with thicknesses in a range of 40 mm to 100 mm inclusive in accordance with Australia NCC Specification C1.10 Clause 4; Dated 24/03/2022.
3. Ignis Solutions; Report No. 5396 I02 R01; Product Evaluation - MetecnoSpan® PIR Steel clad sandwich panel compliance to AS 5637.1:2015 based on below testing; Dated 07/10/2019. a. CSIRO; Report EP141961 Rev B; AS/ISO 9705:2003 Testing with Steel flashings, Internal angle & rivets; Dated 27/02/2014; and b. CSIRO; Report CSME-(C)-2008-75; AS/ISO 9705:1993 Testing with Aluminium flashings, Internal angle & rivets; Dated 06/02/2008.
4. James M Fricker Pty Ltd; Report No. i265e; Declared R (thermally bridged) thermal performance calculations to AS/NZS 4859 Parts 1 & 2:2018; Dated 15/12/2020.
The Certificate Holder has chosen not to make the above evidence of compliance publicly available, due to the documents being considered commercial in confidence.
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
USEFUL INFORMATION
For information on the design, installation and
maintenance of MetecnoSpan® PIR Panels and for our
warranty refer to name 444ǽ*"1
) /
ƞ$/,2-ǽ ,ǽ+7.
OTHER CERTIFICATIONS AND
APPROVALS HELD BY THE STEEL
MANUFACTURER
As the manufacturer of the steel from which
MetecnoSpan® PIR Panels are fabricated, BlueScope
provides assurance that the steel has been
manufactured in accordance with AS 1397-2001 and is
coated in accordance with AS/NZS 2728:2013.
™
pass™ no: Expires:
For further assistance
please contact:
+64 9 277 8844
[email protected]
*"1
) /
ƞ$/,2-ǽ ,ǽ+7
VERSION:
20mm
41mm 292mm 333mm
38mm
1000mm cover width
40mm,60mm
80mm, 100mm
SCOPE AND LIMITATIONS OF USE
,-" &*&1
1&,+0
,
1&,+
In locations with a wind design pressure (ULS) of up to and including 2.5 kPa which includes all NZS 3604:2011 wind zones.
+
))"5-,02/"7,+"0
0!"Ɯ+"!&+
ǘǛǕǙǿǗǕǖǖǽ i %"/"1%"-
+")0
/"1,"20"!&+
*& /,Ȓ )&*
1"ț
0!"Ɯ+"!&+-
/
$/
-%ǙǽǗǽǗ,#
ǘǛǕǙǿǗǕǖǖȜǾ"1
) /
ƞ
+02)
1"!
+")0&01," ,+02)1"!ǽ
In all seismic zones.
In all snow zones.
Any distance from a relevant boundary.
2&)!&+$
In new buildings where the relevant part of the building complies with the NZ Building Code, or in existing buildings where the designer and installer have assured themselves that the relevant part of the building is adequate for the intended building work.
i The span of the panels must be in accordance with the MetecnoSpan® span tables ȝ"1
) /
ƞ
+02)
1"!
+")0ǾǕǜȡǗǕǗǕȞǽ
With a steel or timber framing structure.
On buildings with a minimum roof pitch of 3°.
As internal and external roof panels.
METECNOSPAN® PIR PANELS
PURPOSE
"1" +,-
+Ȭ
+")0
/"02--)&"!6"1
) /
ƞ
+02)
1"!
+")0#,/20"
00")#Ȓ02--,/1&+$Ǿ&+02)
1"!Ǿ#2))6
Ɯ+&0%"!/,,#-
+")0ǽ
EXPLANATION
MetecnoSpan®PIR Panels are manufactured in Australia. The panels have a polyisocyanurate (PIR) foam core with factory laminated COLORBOND®-coated, internal and external facings. %""51"/+
)#
&+$&0ǕǽǙǗ**%,1Ȓ!&--"!Ǿ7&+ Ȓ ,
1"!01/2 12/
)01"")#,/*"!&+
1/
-"7,&!
)-/,Ɯ)"4&1%
single lap corrugation.
The internal facing is 0.5 mm hot-dipped, zinc-coated structural steel formed in an indented Micro V Rib,
1&+)&+",/ &+")&+"-/,Ɯ)"ǽ
The panels are available in:
i Thicknesses (mm): 40, 60, 80, 100 i Width (mm): 1000
i Length (mm): maximum 11900.
The panels are supplied with ancillary components necessary for installation. 19156 12/2022
V1.1
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
NZ Building
Code clauses
BASIS OF COMPLIANCE
Compliance statement Demonstrated by
B1 Structure
B1.3.1, B1.3.2, B1.3.3 (a, b, c, e, f, i, j,
l, m, q), B1.3.4 (a, b, c, d, e)
ALTERNATIVE SOLUTION
i ,
!0-
+
-
&1&"0#,/-"/*&00&)"4&+!-/"002/"2-1,Ǘǽǚ(
ȝ"1
) /
ƞ
+02)
1"!
+")0ǾǕǜȡǗǕǗǕȞǽ
i --/,3
)01
+!
/!ǙǝǝǖȝǖǝȡǕǛȡǗǕǖǘȞǽ
B2 Durability
B2.3.2 (a)
ACCEPTABLE SOLUTION
B2/AS1
i COLORBOND® ,
1"!&+
,/!
+ "4&1%ȡ
ǗǜǗǝǿǗǕǖǘȝ)2" ,-"Ȟǽ
ǘ &/"
ƛ" 1&+$
/"
"6,+!1%"
Ɯ/"0,2/ "
C3.4 (a)
ACCEPTABLE SOLUTION
C/AS1, C/AS2 1
st edition June 2019
i --/,3
)01
+!
/!ǙǝǝǖȝǖǝȡǕǛȡǗǕǖǘȞǽ
i "01&+$1,ȡ
ǘǝǘǜȝ"1" +,
ǾǖǜȡǕǜȡǗǕǖǞȞǽ
i Meets material group number 1S.
E2 External moisture
E2.3.1, E2.3.2, E2.3.3, E2.3.4,
E2.3.5, E2.3.7 (b, c)
ALTERNATIVE SOLUTION
i ,*-
/&0,+4&1%%"/*,0-
+
+02)
1"!
+")0/,,Ɯ+$-
+")0
+!,!"
/("3
)2
1&,+
,#"1
) /
ƞ
+02)
1"!
+")601"*#,/%"/*,0-
+ȝ
),
)Ȓ
/(ǾǗǝȡǕǛȡǗǕǖǜȞǽ
E3 Internal moisture
E3.3.1, E3.3.4, E3.3.5, E3.3.6
ACCEPTABLE SOLUTION
E3/AS1
i COLORBOND® coated steel is impervious to moisture.
i PIR core has an insulation value (refer to H1).
F2 Hazardous Building Materials
F2.3.1
ALTERNATIVE SOLUTION i Coating is inert once dry.
ǖ%"/*
)"ƛ& &"+ 6
H1.3.1 (a, b), H1.3.2E, H1.3.3 (c, e)
ACCEPTABLE SOLUTION
H1/AS1
i R values for panels at 15 °C of 2.3 (40 mm), 3.3 (60 mm), 4.4 (80 mm), 5.5 (100 mm) ȝ"1
) /
ƞ
+02)
1"!
+")0ǾǕǜȡǗǕǗǕȞǽ
ǖǘǞ,0 ,**,+,
!Ǿ&/&Ǿ2 ()
+! i -"1 "/ǽ7ȯ*"1-
+")0ǽ ,ǽ+7 i +64 9 277 8844 i 444ǽ*"1
) /
ƞ$/,2-ǽ ,ǽ+7
PERFORMANCE CLAIMS
#!"0&$+"!Ǿ&+01
))"!
+!*
&+1
&+"!&+
,/!
+ "4&1%
))"1
) /
ƞ
+02)
1"!
+")0/".2&/"*"+10Ǿ1%""1" +,-
+Ȭ
+")04&)) ,*-)64&1%,/ ,+1/&21"1,
compliance with the following performance claims:
SOURCES OF INFORMATION
i )2" ,-"ǽȝǕǛȡǗǕǗǕȞCOLORBOND® steel. Retrieved from %11-0ǿȡȡ444ǽ +0)2"
0 ,-"ǽ ,*ȡ*6ȡ4-Ȓ ,+1"+1ȡ2-),
!0ȡ0&1"0ȡǜȡǗǕǗǕȡǕǛȡȒȚ
"3ǖǙȚǗǕǗǕǕǛǖǜǽ-!#ǽȝ "00"!,+ǕǛȡǕǞȡǗǕǗǖȞǽ
i
ǽȝǗǕȡǕǚȡǗǕǗǕȞHarvesting rainwater. Retrieved from %11-0ǿȡȡ444ǽ)"3")ǽ ,/
$ǽ+7ȡ4
1"/ȡ4
1"/Ȓ02--)6ȡ*
&+0Ȓ,/Ȓ/
&+4
1"/ȡ%
/3"01&+$Ȓ/
&+4
1"/ȡ.
ȝ
"00"!,+ǕǜȡǕǞȡǗǕǗǖȞǽ
i --/,3
)0ǽȝǖǝȡǕǛȡǗǕǖǘȞ"/1&Ɯ
1",#,*-)&
+ "Ȕ --/,3
),#
"1" +,
+")
+!"1" +,-
+
))
+")0&+ ,/!
+ "4&1% --/,3
)
1
+!
/!Ǚǝǝǖǽ--/,3
)
!"+1&Ɯ
1&,+ǿǕǕǕǘǕǙǙǗǚǚǽ
i
),
)Ȓ
/(ǽȝǗǝȡǕǛȡǗǕǖǜȞ"/1&Ɯ
1",#,+#,/*&16ǽ"1
) /
ƞ
+02)
1"!
+")
601"*ǽ"/1&Ɯ
1"2*"/ǿ
ȒǘǕǕǕǜǝȒ"3ǽ
i "1
) /
ƞ
+02)
1"!
+")0ǽȝǕǜȡǗǕǗǕȜȞ"1" +,-
+ȬǽRetrieved from %11-0ǿȡȡ
!
ǖ(&Ǜ1+(-)-#ǽ ),2!#/,+1ǽ+"1ȡǖǕǕǖȡ* ȒǛ--Ȓ*"1" +,0-
+Ȓ/, %2/"Ȓ
4"'2)6ǗǕǗǕȒǖǽ-!#ǽȝ "00"!,+ǛȡǕǞȡǗǕǗǖȞǽ
i "1" +,
ǽȝǖǜȡǕǜȡǗǕǖǞȞ"1" +,-
+Ȕ,)6&0, 6
+2/
1"ț
Ȝ ,/"!
+02)
1"!
,*-,0&1",,Ɯ+$
+") &/"/,-"/1&"0Ȕ
"
1")"
0"
1"0ǽ
1%"/-"/#,/*
+ "01
1"*"+1 BASIS OF STATEMENT
"*,+01/
1"!6
MetecnoSpan® PIR Panels will not contaminate potable water. )
00&Ɯ
1&,+,#/,,#*
1"/&
)002&1
)"#,/!/&+(&+$4
1"/ ,))" 1&,+ȝ
ǾǗǕȡǕǚȡǗǕǗǕȞǽ
"3&+/2+1,+Ǿ" %+&
)&/" 1,/Ǿ ,+Ɯ/*01%
11%&0-
00%
0""+
prepared on behalf of the"1
) /
ƞ
+02)
1"!
+")0
+!&+
,/!
+ "
with MBIE PTS guidelines and in accordance with the TBB pass™ process 4%& %&04&1%&+1%"0 ,-",#ȉ0
ǞǕǕǖ "/1&Ɯ
1&,+ǽ
9606D66ADE51EA6CCC25850D00239F99
,-6/&$%1ȪǗǕǖǜǾ%"2&)!&+$20&+"00&*&1"!țȜǽ))/&$% 10/"0"/3"!ǽ
1. Where a standard is referenced it is to be read as amended by the acceptable solution or 3 "/&Ɯ
1&,+*"1%,!
0
--)&
)"ǽ
2. Sources of information also include the Building Act 2004 and its regulations, including the Building Code (Schedule 1 of the Building Regulations 1992), Acceptable Solutions
+!"/&Ɯ
1&,+"1%,!0Ǿ
+!/")"3
+1 &1"!01
+!
/!0ǽ
"1
) /
ƞ
+02)
1"!
+")0 ,+Ɯ/*01%
1&#"1" +,0-
+&020"!&+
accordance with the requirements of this pass™ the product will comply with the Building Code and other performance claims set out in this pass™ and 1%" ,*-
+6%
0*"1
)),#&10,)&$
1&,+02+!"/0ǖǙ
,#1%"2&)!&+$ 1ǽ
Kevin Brunton
1",#Ɯ/01&002"ǿ
1",# 2//"+1&002"ǿ
ǿ 9429036310852
+,/ )& (1%&0 ,!"#,/
#2))!,4+),
!,#,*-)&
+ "
, 2*"+1
1&,+#,/1%&0-
00ȭǽ
444ǽ*"1
) /
ƞ$/,2-ǽ ,ǽ+7
1/10/21
13/12/2021
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Certificate of Compliance
7KLVFHUWLILFDWHLVLVVXHGIRUWKHIROORZLQJ
$SSURYDORI0HWHFQR3DQHO:DOO &HLOLQJ3DQHOVDQG0HWHFQR6SDQ:DOO 5RRI&HLOLQJ3DQHOV 3URGXFHGZLWK0LQLPXPPP
LQ
6WHHO)DFHUV DQGWKH
6WHSDQIRDP5,
'HVPRGXU913HQWDQH)RDP6\VWHP ZLWK1R+HLJKW5HVWULFWLRQ LQ$FFRUGDQFHZLWK)0$SSURYDO6WDQGDUG
Prepared for:
0HWHFQR3W\/WG7$%RQGRU$XVWUDOLD
,QJUDP5RDG
$FDFLD5LGJH
%ULVEDQH4XHHQVODQG
$XVWUDOLD
)0$SSURYDOV&ODVV
$SSURYDO,GHQWLILFDWLRQ
$SSURYDO*UDQWHG
-XO\
7 R Y H U L I \ W K H D Y D L O D E L O L W \ R I W K H $ S S U R Y H GSURGXFWVSOHDVHUHIHUWRZZZDSSURYDOJXLGHFRP
6DLG$SSURYDOLVVXEMHFWWRVDWLVIDFWRU\ILHOGSHUIRUPDQFHFRQWLQXLQJ6XUYHLOODQFH$XGLWVDQGVWULFWFRQIRUPLW\ WRWKHFRQVWUXFWLRQVDVVKRZQLQWKH$SSURYDO*XLGHDQRQOLQHUHVRXUFHRI)0$SSURYDOV &\QWKLD)UDQN
*URXS0DQDJHU
)0$SSURYDOV
%RVWRQ3URYLGHQFH7XUQSLNH
1RUZRRG0$
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Certificate of Compliance
7KLVFHUWLILFDWHLVLVVXHGIRUWKHIROORZLQJ
)0$SSURYDORI0HWHFQR3DQHODQG0HWHFQR6SDQ:DOO3DQHOV LQ$FFRUGDQFHZLWK)0$SSURYDO6WDQGDUG
Prepared for:
0HWHFQR3W\/WG7$%RQGRU$XVWUDOLD
,QJUDP5RDG
$FDFLD5LGJH4XHHQVODQG
$XVWUDOLD
)0$SSURYDOV&ODVV
$SSURYDO,GHQWLILFDWLRQ
$SSURYDO*UDQWHG
³ 7 R Y H U L I \ W K H D Y D L O D E L O L W \ R I W K H $ SSURYHGSURGXFWSOHDVHUHIHUWRZZZDSSURYDOJXLGHFRP 6DLG$SSURYDOLVVXEMHFWWRVDWLVIDFWRU\ILHOGSHUIRUPDQFHFRQWLQXLQJ6XUYHLOODQFH$XGLWVDQGVWULFWFRQIRUPLW\ WRWKHFRQVWUXFWLRQVDVVKRZQLQWKH$SSURYDO*XLGHDQRQOLQHUHVRXUFHRI)0$SSURYDOV
&\QWKLD()UDQN
$93*URXS0DQDJHU
)0$SSURYDOV
%RVWRQ3URYLGHQFH7XUQSLNH
1RUZRRG0$
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
METECNO
SPAN®
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
All are products are backed by solid warranties and the range of insulated panels, supplied by us can be used in a variety of applications from industrial and commercial coolstore to Agricultural and Architectural buildings.
Metecnospan® is a through fixed system suitable for roof pitches of 3 degrees or more. It is available in sheet lengths to a maximum of 11.9m. For projects with longer roof runs, it can be either “end lapped” in one plane or “stepped” forming a superior expansion joint. Design roof pitches can often suffer structural steel deflection. Our minimum pitch of 3 degrees refers to the actual pitch achieved after any deflection.
Metecnospan® is made using steel from BlueScope
-Colorbond® with the top sheet being 0.42mm hi-tensile steel, a standard upheld by all reputable, Australasian steel roofing product manufacturers.
Metecnospan® is suitable for a wide range of developments including supermarkets, bulk goods, fast food and retail outlets as well as commercial and industrial premises. It is ideal where superior thermal performance and FM approval for insurance purposes is required.
MetecnoSpan®
FM APPROVAL
MetecnoSpan® is manufactured by our sister company: Metecno in Brisbane who is the FM Approved product owner.
FM 4880 Approved Class 1 - Unlimited Height.
FM 4881 Approved Class 1 - Unlimited Height.
FM 4471 Approved Class 1 -External roof and wall endurance standard.
METALCRAFT INSULATED PANELS SPECIALISES IN THE
MANUFACTURE AND SUPPLY OF INSULATED PANELS.
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
STYLE & PERFORMANCE
PANEL DIMENSIONS
PRODUCT PROPERTIES
Core Polyisocyanurate (PIR) foam.
FM Approved, unlimited height.
External facing 0.42mm high tensile
COLORBOND® steel.
Internal Facing
0.50mm G300, Z275 coated steel to
AS 1397 formed with Micro V Finish,
Satinline or Fineline inner skin.
Width 1000mm
Length
As required, determined by handling
and design 11.9m max. For longer
sheets either use end laps or a
"stepped" joint.
Pitch Minimum 3 degrees after deflection.
Thickness 40mm, 60mm, 80mm, 100mm
WIDTH AND AVAILABLE
LENGTHS
MetecnoSpan® is 1000mm wide and available with different inner skins. The maximum length of panels are restricted to
11.9m without a lap or jointing detail.
INNER PROFILE
OPTIONS
MetecnoSpan® is available with different inner skins.
20mm
41mm 292mm 333mm
38mm
MICRO V FINISH
63mm 4mm
Bottom skin
FINELINE FINISH
1mm
Bottom skin
34mm 34mm
SATINLINE FINISH
1mm
Bottom skin
30mm 30mm
1000mm cover width
40mm,60mm
80mm, 100mm
MINIMUM ORDER
QUANTITIES
Please ask Metalcraft Insulated Panels if the inner skin you prefer is available for your project as minimum order quantities might apply.
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
FIRE HAZARD
PROPERTIES
AS 1530.3 INDICES
Ignitability Index 0
Spread of Flame Index 0
Heat Evolved Index 0
Smoke Index 1
AS/ISO 9705
BCA Group Number (Spec C1.10a)
MetecnoSpan® PIR steel skinned insulated building panels conform to the requirements of the BCA Specification C1.10a as Group 2. This have been approved by a NZ engineer who has given it a Group 2S classification for the New Zealand Building Code.
Group 2S NZBC
ACOUSTIC
Acoustic testing of MetecnoSpan® has been performed in compliance with the requirements of AS 1191-2002 "Acoustics - Method for laboratory Measurement of Airborne Sound Insulation of Building elements".
THERMAL
The below total R-values are for insulation average
temperature of 15°C. Contact us for other temperatures.
Panel
Thickness
40 mm
60 mm
80 mm
100
mm
‘R’ (mK/W) 2.3 3.3 4.4 5.5
‘U’ (m2k/W) 0.44 0.31 0.24 0.19
Mass (Kg/m2) 10.7 11.6 12.7 13.2
Freq
Hz
100 160 200 250 315 400 630 800 1000 1250 1600 2000 2500 3150 5000 STC R w (a)
40mm 16.0 16.8 19.6 19.8 21.4 22.4 23.7 24.5 24.0 20.3 20.3 28.5 30.4 33.4 36.6 24 25 (b)
100mm 16.4 16.6 19.0 20.4 20.9 19.4 17.7 16.2 23.9 30.7 35.0 34.4 32.9 35.3 39.9 22 24 Panel up to 200mm or less with an aluminium ‘wall-wall’ and ‘wall-ceiling’ angles (1.5mm) fixed with aluminium rivets or screws is classified as Group 2S. Panel up to 200mm or less with a steel ‘wall-wall’ and ‘wall-ceiling’ angles (0.5mm) fixed with steel rivets or screws is classified as Group 2S.
AS 2122.1-1993
Compliance to AS 1366.2-1992 Clause 10 Table 2 -
Flame Propagation Characteristics Requirement:
• Median flame duration (max) 1 second
• Eighth value (max) 1.5 seconds
• Median mass retained (min) 80 %
• Eighth value (min) 75 %
Complies - Refer test report:
AWTA Prduct Testing7-593352-CQ
METECNO
SPAN®
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
LOADSPAN TABLE
SINGLE SPAN-NON-CYCLONIC REGION
A&B (ROOF APPLICATIONS ONLY)
Single span, wind pressure acting outwards
Maximum uniformly distributed load (kPa) for the given span:
MULTI SPAN-NON-CYCLONIC REGION A&B
(ROOF APPLICATIONS ONLY)
Multi-span, wind pressure acting outwards
Maximum uniformly distributed load (kPa) for the given span:
1 Pressures specified are for wind gusts only per
AS/NZS 1170.
2 Self weight of the panel has been allowed for, plus an allowance of up to 10kg/m2 for light duty fittings (lights, etc.). No other dead loads permitted.
3 Non-trafficable maintenance access (concentrated load) of 140kg on any one panel has been allowed for (exceeding
min. requirements of AS/NZS 1170.1:2002).
4 Distributed live load of 0.25kPa has been allowed for (as per AS/NZS 1170.1:2001). MetecnoSpan® tests comply with details outlined in AS4040. AS1562 and AS/NZS 1170.
5 Deflection limit of span/150 applies, and in accordance with Serviceability Limit State criteria per AS/NZS 1170.0 – TABLE C1.
6 Fixing with 14g tek screws (or equivalent) at each rib are required.
7 Min. roof slope of 3 degree applies.
8 Extended span tables including cyclonic regions C&D and spans for wind pressure acting inwards are also available. 9 For FM Approved applications:
a) a max. span of 1830mm applies.
b) approved fasteners must be used.
Refer Metalcraft Insulated Panel Systems.
SPAN
(mm)
SINGLE SPAN
Wind pressure acting outwards
40 60 80 100
1500 4.99 6.94 8.56 9.83
1800 4.17 5.80 7.15 8.21
2100 3.50 4.63 5.83 7.06
2400 2.70 3.57 4.49 5.43
2700 2.15 2.84 3.57 4.31
3000 1.76 2.32 2.91 3.51
3300 1.47 1.93 2.42 2.92
3600 1.25 1.64 2.05 2.47
3900 1.08 1.41 1.76 2.12
4200 0.94 1.23 1.53 1.85
4500 0.83 1.08 1.35 1.62
4800 0.74 0.96 1.20 1.44
5100 0.67 0.86 1.07 1.29
3 STEP PANEL SELECTION
1 Determine thermal and fire performance requirement (If FM Approval is required -maximum span is 1830mm) 2 Determine worst case fully factored design wind load that applies to any roof panel (kPa) in ULS (Ultimate limit state) 3 Select appropriate span versus thickness for single or multi-span from tables. Note spans can be reduced at building edges by appropriate building design.
SPAN
(mm)
MULTI SPAN
Wind pressure acting outwards
40 60 80 100
1500 4.01 5.57 6.87 7.31
1800 3.36 4.66 5.74 6.11
2100 2.89 4.01 4.93 5.25
2400 2.54 3.52 4.33 4.61
2700 2.27 3.14 3.86 4.11
3000 2.05 2.83 3.48 3.71
3300 1.87 2.58 3.18 3.38
3600 1.72 2.38 2.92 3.11
3900 1.48 2.20 2.70 2.88
4200 1.29 2.02 2.52 2.68
4500 1.14 1.77 2.32 2.51
4800 1.01 1.57 2.05 2.63
5100 0.9 1.40 1.83 2.20
NOTES
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
BRANCHES
WWW.METALCRAFTGROUP.CO.NZ
AUCKLAND
139 Roscommon Road, Wiri, Auckland
T: 09 277 8844
[email protected]
HAMILTON
9 Earthmover Cres, Burbush, Hamilton
07 849 3807
[email protected]
DISCLAIMER
As part of Metalcraft Insulated Panels policy of continued improvement, final specifications may vary from those contained in this publication. The company reserves the right at any time and without notice to change the design, materials or features and withdraw products from the market without incurring any liability whatsoever. This publication is issued as a general guide only and should not be treated as a substitute for technical advice. Contact with your nearest Metalcraft branch is recommended to confirm current specifications and availability.
For more information on Metalcraft Insulated Panels visit:
www.metalcraftgroup.co.nz.
Metalcraft Insulated Panels is part of United Industries Ltd.
For more information on United Industries visit:
www.unitedindustries.co.nz.
Brochure version July 2020
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Testing Of CS For Doors
Automated Cavity Slider “AutoCav”
Product Configuration:
Autocav Electric Cavity Sliders (Dunka Motor & CS Controller) With Stainless Steel Doors
CS - Locking Dunka motor, SMC, self-tensioning idler
2020mm x 931mm
Testing Location:
On Site at Exeloo Factory , Auckland New Zealand
Product pre-installed into self-contained WC for testing.
Methodology:
Product tested is the heaviest of the CS/Exeloo Product and was tested on a pre-installed unit to fully replicate final site and consumer use conditions.
An Imada digital force gauge (ZTS-500N) was used to test the opening force required, without power, at the base , center and top of the sliding door.
The same test was also conducted , with power, to test the impact force required to stop the closing motion of the door (replicating human impact).
Date of Test: July 1
st, 2022
Testing Engineer: Arno Oliver
1. Open force in power down ч133n : Pass
CS Group tested the force to open and close the Exeloo door without power.
Average force to open the door was 32N, average force to close the door was 27N. Standard allows for 133N. (fig.1)
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
2 2. Open force for Human Impactч133n: Pass
CS Group measured the force to stop the door closing on someone. Highest reading of 5 was 71.4N. Standard allows for 133N.
)LJ
2SHQIRUFH7HVW )LJ
,PSDFW)RUFH7HVW
2Q%HKDOIRI&6)RU'RRUV&6*URXS
1LFN%ULGJH
*HQHUDO0DQDJHU
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
32%R[6DQ/XLV2ELVSR&$
3KRQH
)D[
6%3KRQH
(PDLO
PDLO#WKHQJLQHHUVFRP
0RQGD\0D\
6758&785$/&$/&8/$7,216)25
-XSLWHU7ZLQ$FFHVVLEOH+&'6XEPLWWDO
-RE
([HORR
+&'
-XSLWHU7ZLQ
7RUR6WUHHW
6DQ/XLV2ELVSR&$
&OLHQW
([HORR
7RUR6WUHHW
6DQ/XLV2ELVSR&$
7KHVLJQLQJHQJLQHHULVRQO\UHVSRQVLEOHIRUEXLOGLQJV\VWHPVUHYLHZHGE\KLP7KHVWUXFWXUHKDVEHHQGHVLJQHGRQO\IRUWKHORDGVZLWKLQ WKHVHFDOFXODWLRQV$Q\FKDQJHVDGGLWLRQVRIGLVFUHSDQF\VKDOOEHEURXJKWWRWKHHQJLQHHU¶VDWWHQWLRQSULRUWRDQ\IXUWKHUZRUNEHLQJGRQH 3OHDVHEHDZDUHZKHQPDNLQJFRSLHVRIWKHDWWDFKHGFDOFXODWLRQVWKDWWKH\PD\EHSULQWHGRQERWKVLGHV:HGRWKLVWRPLQLPL]HWKHXVHRI SDSHUIRUHQYLURQPHQWDOFRQFHUQV
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
&/,(17 ([HORR
-2%
(1*,1((5
&+(&.
'$7(
6758&785$/&$/&8/$7,216
7$%/(2)&217(176 3$*(
%DVLVRI'HVLJQ
5$0(OHPHQWV0RGHO
%DVH3ODWH&DOFXODWLRQV
6$)()RXQGDWLRQ&DOFXODWLRQV
20)&RQQHFWLRQ
$33(1',;
(QJLQHHULQJ&DOFXODWLRQVE\$&+&RQVXOWLQJ(QJLQHHUV
IRUUHIHUHQFHRQO\
5/20/2020
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
>ŽĂĚdĂŬĞͲŽĨĨ
ZŽŽĨĞĂĚ ϭϬ ƉƐ Ĩ
tĂůů ϭϰ ƉƐ Ĩ
ZŽŽĨ>ŝǀĞ ϮϬ ƉƐ Ĩ
ŝƐƚƌŝďƵƚĞĚ>ŽĂĚƚŽZŽŽĨĞĂŵƐ
> >>Z
dƌŝď ϭϬ ϮϬ ƉƐ Ĩ
ϯ͘ϳϱĨƚ ϯϳ͘ϱ ϳϱ ƉůĨ
>ĂƚĞƌĂůŶĂůLJƐŝƐ͗^ŚŽƌƚͲŝƌĞĐƚŝŽŶ
tŝŶĚ>ŽĂĚ;ϭ͘ϬtͿ
WƌĞƐƐƵƌĞ ϱϮ ƉƐ Ĩ
Ɖϭ ϳϴϬůďƐ ϯϵϬ ůďƐĂƚĞĂĐŚŶŽĚĞΛŽƵƚĞƌĨƌĂŵĞƐ;ϮŶŽĚĞƐͿ ƉϮ ϭϬϵϮůďƐ ϱϰϲ ůďƐĂƚĞĂĐŚŶŽĚĞΛŝŶƚĞƌŝŽƌĨƌĂŵĞƐ;ϮŶŽĚĞƐͿ ^ĞŝƐŵŝĐ>ŽĂĚ;ϭ͘Ϭ
Ϳ
tĂůů ϭϭϮ Ɖů
Ĩ
ZŽŽĨ ϳϱ Ɖů Ĩ
ϭϴϳ Ɖů Ĩ
^ĚƐ Ϯ͘ϭ
Zϯ ͘ϱ
Ɛ Ϭ͘ϲϬϬ
Ɖϭ ϰϮϭůďƐ ϮϭϬ ůďƐĂƚĞĂĐŚŶŽĚĞΛŽƵƚĞƌĨƌĂŵĞƐ;ϮŶŽĚĞƐͿ ƉϮ ϱϴϵůďƐ Ϯϵϱ ůďƐĂƚĞĂĐŚŶŽĚĞΛŝŶƚĞƌŝŽƌĨƌĂŵĞƐ;ϮŶŽĚĞƐͿ tŝŶĚŐŽǀĞƌŶƐŝŶƐŚŽƌƚͲĚŝƌĞĐƚŝŽŶ
>ĂƚĞƌĂůŶĂůLJƐŝƐ͗>ŽŶŐͲŝƌĞĐƚŝŽŶ
tŝŶĚ>ŽĂĚ;ϭ͘ϬtͿ
WƌĞƐƐƵƌĞ ϱϮ ƉƐ Ĩ
Ɖϭ ϴϮϵ ϮϬϳ ůďƐĂƚĞĂĐŚŶŽĚĞ;ϰŶŽĚĞƐͿ
^ĞŝƐŵŝĐ>ŽĂĚ;ϭ͘Ϭ
Ϳ
tĂůů ϭϭϮ Ɖů
Ĩ
ZŽŽĨ ϭϴϬ Ɖů Ĩ
ϮϵϮ Ɖů Ĩ
^ĚƐ Ϯ͘ϭ
Zϯ ͘ϱ
Ɛ Ϭ͘ϲϬϬ
>ŽŶŐ ϲϱϳ ůďƐ
ϯϬй^ŚŽƌƚ ϯϬϯ ůďƐ
dŽƚĂů ϵϲϬůďƐ ϮϰϬ ůďƐĂƚĞĂĐŚŶŽĚĞ;ϰŶŽĚĞƐͿ
^ĞŝƐŵŝĐŐŽǀĞƌŶƐŝŶůŽŶŐͲĚŝƌĞĐƚŝŽŶ
See attached calculations by ACH Consulting
Engineers for reference. Our calculations are in
agreement that the design of the frame is
governed by wind loading in the short direction.
Comparison of design wind pressure:
Per ACH Consulting Engineers
P = 1.44kPa (windward) + 1.03kPa (leeward)
= 2.47kPa = 52psf
Per our office determined wind loading:
P = 30.83 psf >> Use 52 psf in Calculations
This indicates that the frame design loads are
conservative and satisfy minimum wind design
loads per 2016 CBC
9 Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
352-(&7
3$*(
&/,(17
'(6,*1%<
-2%12
'$7(
5(9,(:%<
,1387'$7$
5RRI6ORSH
([SRVXUHFDWHJRU\
%&RU'
$6&(6HF
'
%DVLF:LQG6SHHG
$6&(),*85($
9 PSK
7RSRJUDSKLFIDFWRU
$6&(6HFSJ
.]W )ODW
%XLOGLQJKHLJKWWRHDYH K H IW
%XLOGLQJKHLJKWWRULGJH K U IW
%XLOGLQJOHQJWK / IW
%XLOGLQJZLGWK % IW
(IIHFWLYHDUHDRIFRPSRQHQWV $ IW
'(6,*16800$5<
3UHVVXUHDWIDFHRIZDOO SVI
DWZDOOHQG]RQHV
0D[KRUL]RQWDOIRUFHQRUPDOWREXLOGLQJOHQJWK/IDFH NLSV 0D[KRUL]RQWDOIRUFHQRUPDOWREXLOGLQJOHQJWK%IDFH NLSV 0D[WRWDOKRUL]RQWDOWRUVLRQDOORDG IWNLSV
0D[WRWDOXSZDUGIRUFH NLSV
$1$/<6,6
9HORFLW\SUHVVXUH
T] .K.]W.G9
SVI
ZKHUH
T ] YHORFLW\SUHVVXUHDWPHDQURRIKHLJKWK
(TSJ
.K YHORFLW\SUHVVXUHH[SRVXUHFRHIILFLHQWHYDOXDWHGDWKHLJKWK 7DE
.G ZLQGGLUHFWLRQDOLW\IDFWRU
7DEIRUEXLOGLQJSDJH
.]W WRSRJUDSKLFIDFWRU
)LJ
K PHDQURRIKHLJKW IW
'HVLJQSUHVVXUHVIRU0:)56
S TK>
*&SI
*&SL
@
ZKHUH
S SUHVVXUHLQDSSURSULDWH]RQH
(TSDJH
*&SI SURGXFWRIJXVWHIIHFWIDFWRUDQGH[WHUQDOSUHVVXUHFRHIILFLHQWVHHWDEOHEHORZ )LJSDJH
*&SL SURGXFWRIJXVWHIIHFWIDFWRUDQGLQWHUQDOSUHVVXUHFRHIILFLHQW 7DEOH(QFORVHG%XLOGLQJSDJH
RU
D ZLGWKRIHGJHVWULSV)LJQRWH
SDJH0$;>0,1
0,1
%/
K
0,1
%/
@ IW
([HORR
:LQG$QDO\VLVIRU/RZULVH%XLOGLQJ%DVHGRQ$6&(0:)56(QYHORSH3URFHGXUH IW>%XLOGLQJ+HLJKW6DWLVIDFWRU\@
RI
1HW3UHVVXUHV
SVI
%DVLF/RDG&DVHV 1HW3UHVVXUHV
SVI
7RUVLRQDO/RDG&DVHV
*&SL
*& SL
*&SL
*& SL
*&SL
*& SL
7
7
7
7
(
(
(
*&SL
*& SL
( 7 ( 7
( 7 7
5RRIDQJOHθ
*&SI
5RRIDQJOHθ 5RRIDQJOH θ
1HW3UHVVXUHZLWK6XUIDFH *&SI
1HW3UHVVXUHZLWK 6XUIDFH
6XUIDFH
5RRIDQJOHθ
*&SI
1HW3UHVVXUHZLWK
1HW3UHVVXUH
SVI
ZLWK*&SI
RI
16 Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
'HVLJQSUHVVXUHVIRUFRPSRQHQWVDQGFODGGLQJ
S TK>
*&S
*&SL
@
ZKHUH
S SUHVVXUHRQFRPSRQHQW
(TSJ
SPLQ SVI
6HFSJ
*&S H[WHUQDOSUHVVXUHFRHIILFLHQW
VHHWDEOHEHORZ
)LJSDJHa
(IIHFWLYH
$UHD
IW
*&3 *&3 *&3 *&3 *&3 *&3 *&3 *&3 *&3 *&3 &RPS
:DOOVUHGXFHG)LJ$QRWH
3RVLWLYH 1HJDWLYH 3RVLWLYH 1HJDWLYH 3RVLWLYH 1HJDWLYH 3RVLWLYH 1HJDWLYH 3RVLWLYH 1HJDWLYH
2YHUKDQJ=RQH 2YHUKDQJ=RQH
*&S
SVI
0LQ*RY 0LQ*RY 0LQ*RY
=RQH =RQH
&RPS &ODGGLQJ =RQH
=RQH =RQH
=RQH
7KHVHORDGVDUHDW0XOWLSO\E\IRU$6'
3UHVVXUH
=RQH
=RQH
=RQH
SVI
2YHUKDQJ
=RQH
RI RI
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
0LFURVRIW
8QLWVV\VWHP
(QJOLVK
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
0LFURVRIW
8QLWVV\VWHP
(QJOLVK
/RDGFRQGLWLRQ
'/ 'HDG/RDG
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
0LFURVRIW
8QLWVV\VWHP
(QJOLVK
/RDGFRQGLWLRQ
//U 5RRI/LYH
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
0LFURVRIW
8QLWVV\VWHP
(QJOLVK
/RDGFRQGLWLRQ
: :LQG
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
0LFURVRIW
8QLWVV\VWHP
(QJOLVK
/RDGFRQGLWLRQ
(4 6HLVPLF
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
0LFURVRIW
8QLWVV\VWHP
(QJOLVK
/RDGFRQGLWLRQ
' '/://U
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
0LFURVRIW
8QLWVV\VWHP
(QJOLVK
/RDGFRQGLWLRQ
' '/://U
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
0LFURVRIW
8QLWVV\VWHP
(QJOLVK
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
&RPSDQ\
7+( 'DWH
(QJLQHHU
56 3DJH
3URMHFW
$GGUHVV
3KRQH
(PDLO
$QFKRU'HVLJQHU
6RIWZDUH
9HUVLRQ
3URMHFW LQIRUPDWLRQ
&XVWRPHU FRPSDQ\
&XVWRPHU FRQWDFW QDPH
&XVWRPHU HPDLO
&RPPHQW
3URMHFW GHVFULSWLRQ
(GJH &RQGLWLRQ
/RFDWLRQ
)DVWHQLQJ GHVFULSWLRQ
,QSXW 'DWD $QFKRU 3DUDPHWHUV
*HQHUDO
'HVLJQ PHWKRG
$&,
8QLWV
,PSHULDO XQLWV
$QFKRU ,QIRUPDWLRQ
$QFKRU W\SH
&DVWLQSODFH
0DWHULDO
$:6 7\SH $
'LDPHWHU
LQFK
(IIHFWLYH (PEHGPHQW GHSWK K
HI
LQFK
$QFKRU FDWHJRU\
$QFKRU GXFWLOLW\
<HV
K
PLQ
LQFK
&PLQ
LQFK
6PLQ
LQFK
%DVH0DWHULDO
&RQFUHWH
1RUPDOZHLJKW
&RQFUHWH WKLFNQHVV K
LQFK
6WDWH
&UDFNHG
&RPSUHVVLYH VWUHQJWK I¶
F
SVL
ȌF9
5HLQIRUFHPHQW FRQGLWLRQ
$ WHQVLRQ % VKHDU
6XSSOHPHQWDO UHLQIRUFHPHQW
1RW DSSOLFDEOH
5HLQIRUFHPHQW SURYLGHG DW FRUQHUV
1R
,JQRUH FRQFUHWH EUHDNRXW LQ WHQVLRQ
1R
,JQRUH FRQFUHWH EUHDNRXW LQ VKHDU
1R
,JQRUH GR UHTXLUHPHQW
<HV
%XLOGXS JURXW SDG
1R
%DVH3ODWH
/HQJWK [ :LGWK [ 7KLFNQHVV
LQFK
[ [
5HFRPPHQGHG $QFKRU
$QFKRU 1DPH
+HDGHG 6WXG $:6 7\SH $ +HDGHG 6WXG
:/DV3RVLWDV%RXOHYDUG3OHDVDQWRQ&$
3KRQH
)D[
ZZZVWURQJWLHFRP6LPSVRQ6WURQJ7LH&RPSDQ\,QF ,QSXWGDWDDQGUHVXOWVPXVWEHFKHFNHGIRUDJUHHPHQWZLWKWKHH[LVWLQJFLUFXPVWDQFHVWKHVWDQGDUGVDQGJXLGHOLQHVPXVWEHFKHFNHGIRUSODXVLELOLW\
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
&RPSDQ\
7+( 'DWH
(QJLQHHU
56 3DJH
3URMHFW
$GGUHVV
3KRQH
(PDLO
$QFKRU'HVLJQHU
6RIWZDUH
9HUVLRQ
/RDG DQG *HRPHWU\
/RDG IDFWRU VRXUFH
$&, 6HFWLRQ
/RDG FRPELQDWLRQ
QRW VHW
6HLVPLF GHVLJQ
<HV
$QFKRUV VXEMHFWHG WR VXVWDLQHG WHQVLRQ
1RW DSSOLFDEOH
'XFWLOLW\ VHFWLRQ IRU WHQVLRQ
E
LV VDWLVILHG
'XFWLOLW\ VHFWLRQ IRU VKHDU
E
LV VDWLVILHG
ȍ
IDFWRU
QRW VHW
$SSO\ HQWLUH VKHDU ORDG DW IURQW URZ
1R
$QFKRUV RQO\ UHVLVWLQJ ZLQG DQGRU VHLVPLF ORDGV
<HV
6WUHQJWK OHYHO ORDGV
1 XD >OE@
9XD[ >OE@
9XD\ >OE@
0X[ >IWOE@
0X\ >IWOE@
0X] >IWOE@
)LJXUH !
:/DV3RVLWDV%RXOHYDUG3OHDVDQWRQ&$
3KRQH
)D[
ZZZVWURQJWLHFRP6LPSVRQ6WURQJ7LH&RPSDQ\,QF ,QSXWGDWDDQGUHVXOWVPXVWEHFKHFNHGIRUDJUHHPHQWZLWKWKHH[LVWLQJFLUFXPVWDQFHVWKHVWDQGDUGVDQGJXLGHOLQHVPXVWEHFKHFNHGIRUSODXVLELOLW\
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
&RPSDQ\
7+( 'DWH
(QJLQHHU
56 3DJH
3URMHFW
$GGUHVV
3KRQH
(PDLO
$QFKRU'HVLJQHU
6RIWZDUH
9HUVLRQ
)LJXUH!
:/DV3RVLWDV%RXOHYDUG3OHDVDQWRQ&$
3KRQH
)D[
ZZZVWURQJWLHFRP6LPSVRQ6WURQJ7LH&RPSDQ\,QF ,QSXWGDWDDQGUHVXOWVPXVWEHFKHFNHGIRUDJUHHPHQWZLWKWKHH[LVWLQJFLUFXPVWDQFHVWKHVWDQGDUGVDQGJXLGHOLQHVPXVWEHFKHFNHGIRUSODXVLELOLW\
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
&RPSDQ\
7+( 'DWH
(QJLQHHU
56 3DJH
3URMHFW
$GGUHVV
3KRQH
(PDLO
$QFKRU'HVLJQHU
6RIWZDUH
9HUVLRQ
6KHDU ORDG \
9XD\
OE
$QFKRU 7HQVLRQ ORDG
1XD
OE
5HVXOWLQJ$QFKRU)RUFHV
6KHDU ORDGFRPELQHG
¥
9 XD[
ð
9XD\
ð
OE
6KHDU ORDG [
9 XD[
OE
6XP
0D[LPXP FRQFUHWH FRPSUHVVLRQ VWUDLQ
Å
0D[LPXP FRQFUHWH FRPSUHVVLRQ VWUHVV
SVL
5HVXOWDQW WHQVLRQ IRUFH
OE
5HVXOWDQW FRPSUHVVLRQ IRUFH
OE
(FFHQWULFLW\ RI UHVXOWDQW WHQVLRQ IRUFHV LQ [D[LV H
1[
LQFK
(FFHQWULFLW\ RI UHVXOWDQW WHQVLRQ IRUFHV LQ \D[LV H
1\
LQFK
)LJXUH!
6WHHO6WUHQJWKRI$QFKRULQ7HQVLRQ
6HF
1VD
OE
I I1VD
OE
&RQFUHWH%UHDNRXW6WUHQJWKRI$QFKRULQ7HQVLRQ
6HF
1E N FODI¶FKHI
(T D
NF OD I¶F
SVL
KHI
LQ
1E
OE
I1FEJ I
$1F $ 1FR
<HF1<HG1<F1<FS11E
6HF (T E
$1F
LQ
$1FR
LQ
FDPLQ
LQ
<HF1 <HG1 <F1 <FS1 1E
OE
I I1FEJ
OE
3XOORXW6WUHQJWKRI$QFKRULQ7HQVLRQ
6HF
I1SQ I<F31S I<F3$EUJI¶F
6HF (T
<F3 $EUJ
LQ
I¶F
SVL
I I1SQ
OE
:/DV3RVLWDV%RXOHYDUG3OHDVDQWRQ&$
3KRQH
)D[
ZZZVWURQJWLHFRP6LPSVRQ6WURQJ7LH&RPSDQ\,QF ,QSXWGDWDDQGUHVXOWVPXVWEHFKHFNHGIRUDJUHHPHQWZLWKWKHH[LVWLQJFLUFXPVWDQFHVWKHVWDQGDUGVDQGJXLGHOLQHVPXVWEHFKHFNHGIRUSODXVLELOLW\
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
&RPSDQ\
7+( 'DWH
(QJLQHHU
56 3DJH
3URMHFW
$GGUHVV
3KRQH
(PDLO
$QFKRU'HVLJQHU
6RIWZDUH
9HUVLRQ
5HVXOWV
,QWHUDFWLRQRI7HQVLOHDQG6KHDU)RUFHV
6HF'
"
7HQVLRQ )DFWRUHG /RDG 1 XD
OE
'HVLJQ 6WUHQJWK ¡1 Q
OE
5DWLR 6WDWXV
6WHHO
3DVV
&RQFUHWHEUHDNRXW
3DVV
*RYHUQV
3XOORXW 3DVV
$:67\SH$+HDGHG6WXGZLWKKHI LQFKPHHWVWKHVHOHFWHGGHVLJQFULWHULD :DUQLQJV
0LQLPXP VSDFLQJ DQG HGJH GLVWDQFH UHTXLUHPHQW RI GD SHU $&, 6HFWLRQV DQG IRU WRUTXHG FDVWLQSODFH DQFKRU LV ZDLYHG SHU GHVLJQHU RSWLRQ
3HU GHVLJQHU LQSXW GXFWLOLW\ UHTXLUHPHQWV IRU WHQVLRQ KDYH EHHQ GHWHUPLQHG WR EH VDWLVILHG ± GHVLJQHU WR YHULI\ 3HU GHVLJQHU LQSXW GXFWLOLW\ UHTXLUHPHQWV IRU VKHDU KDYH EHHQ GHWHUPLQHG WR EH VDWLVILHG ± GHVLJQHU WR YHULI\ 'HVLJQHU PXVW H[HUFLVH RZQ MXGJHPHQW WR GHWHUPLQH LI WKLV GHVLJQ LV VXLWDEOH
:/DV3RVLWDV%RXOHYDUG3OHDVDQWRQ&$
3KRQH
)D[
ZZZVWURQJWLHFRP6LPSVRQ6WURQJ7LH&RPSDQ\,QF ,QSXWGDWDDQGUHVXOWVPXVWEHFKHFNHGIRUDJUHHPHQWZLWKWKHH[LVWLQJFLUFXPVWDQFHVWKHVWDQGDUGVDQGJXLGHOLQHVPXVWEHFKHFNHGIRUSODXVLELOLW\
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
&RPSDQ\
7+( 'DWH
(QJLQHHU
56 3DJH
3URMHFW
$GGUHVV
3KRQH
(PDLO
$QFKRU'HVLJQHU
6RIWZDUH
9HUVLRQ
3URMHFW LQIRUPDWLRQ
&XVWRPHU FRPSDQ\
&XVWRPHU FRQWDFW QDPH
&XVWRPHU HPDLO
&RPPHQW
3URMHFW GHVFULSWLRQ
&RUQHU &RQGLWLRQ
/RFDWLRQ
)DVWHQLQJ GHVFULSWLRQ
,QSXW 'DWD $QFKRU 3DUDPHWHUV
*HQHUDO
'HVLJQ PHWKRG
$&,
8QLWV
,PSHULDO XQLWV
$QFKRU ,QIRUPDWLRQ
$QFKRU W\SH
&DVWLQSODFH
0DWHULDO
$:6 7\SH $
'LDPHWHU
LQFK
(IIHFWLYH (PEHGPHQW GHSWK K
HI
LQFK
$QFKRU FDWHJRU\
$QFKRU GXFWLOLW\
<HV
K
PLQ
LQFK
&PLQ
LQFK
6PLQ
LQFK
%DVH0DWHULDO
&RQFUHWH
1RUPDOZHLJKW
&RQFUHWH WKLFNQHVV K
LQFK
6WDWH
&UDFNHG
&RPSUHVVLYH VWUHQJWK I¶
F
SVL
ȌF9
5HLQIRUFHPHQW FRQGLWLRQ
$ WHQVLRQ % VKHDU
6XSSOHPHQWDO UHLQIRUFHPHQW
1RW DSSOLFDEOH
5HLQIRUFHPHQW SURYLGHG DW FRUQHUV
1R
,JQRUH FRQFUHWH EUHDNRXW LQ WHQVLRQ
1R
,JQRUH FRQFUHWH EUHDNRXW LQ VKHDU
1R
,JQRUH GR UHTXLUHPHQW
<HV
%XLOGXS JURXW SDG
1R
%DVH3ODWH
/HQJWK [ :LGWK [ 7KLFNQHVV
LQFK
[ [
5HFRPPHQGHG $QFKRU
$QFKRU 1DPH
+HDGHG 6WXG $:6 7\SH $ +HDGHG 6WXG
:/DV3RVLWDV%RXOHYDUG3OHDVDQWRQ&$
3KRQH
)D[
ZZZVWURQJWLHFRP6LPSVRQ6WURQJ7LH&RPSDQ\,QF ,QSXWGDWDDQGUHVXOWVPXVWEHFKHFNHGIRUDJUHHPHQWZLWKWKHH[LVWLQJFLUFXPVWDQFHVWKHVWDQGDUGVDQGJXLGHOLQHVPXVWEHFKHFNHGIRUSODXVLELOLW\
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
&RPSDQ\
7+( 'DWH
(QJLQHHU
56 3DJH
3URMHFW
$GGUHVV
3KRQH
(PDLO
$QFKRU'HVLJQHU
6RIWZDUH
9HUVLRQ
/RDG DQG *HRPHWU\
/RDG IDFWRU VRXUFH
$&, 6HFWLRQ
/RDG FRPELQDWLRQ
QRW VHW
6HLVPLF GHVLJQ
<HV
$QFKRUV VXEMHFWHG WR VXVWDLQHG WHQVLRQ
1RW DSSOLFDEOH
'XFWLOLW\ VHFWLRQ IRU WHQVLRQ
E
LV VDWLVILHG
'XFWLOLW\ VHFWLRQ IRU VKHDU
E
LV VDWLVILHG
ȍ
IDFWRU
QRW VHW
$SSO\ HQWLUH VKHDU ORDG DW IURQW URZ
1R
$QFKRUV RQO\ UHVLVWLQJ ZLQG DQGRU VHLVPLF ORDGV
<HV
6WUHQJWK OHYHO ORDGV
1 XD >OE@
9XD[ >OE@
9XD\ >OE@
0X[ >IWOE@
0X\ >IWOE@
0X] >IWOE@
)LJXUH !
:/DV3RVLWDV%RXOHYDUG3OHDVDQWRQ&$
3KRQH
)D[
ZZZVWURQJWLHFRP6LPSVRQ6WURQJ7LH&RPSDQ\,QF ,QSXWGDWDDQGUHVXOWVPXVWEHFKHFNHGIRUDJUHHPHQWZLWKWKHH[LVWLQJFLUFXPVWDQFHVWKHVWDQGDUGVDQGJXLGHOLQHVPXVWEHFKHFNHGIRUSODXVLELOLW\
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
&RPSDQ\
7+( 'DWH
(QJLQHHU
56 3DJH
3URMHFW
$GGUHVV
3KRQH
(PDLO
$QFKRU'HVLJQHU
6RIWZDUH
9HUVLRQ
)LJXUH!
:/DV3RVLWDV%RXOHYDUG3OHDVDQWRQ&$
3KRQH
)D[
ZZZVWURQJWLHFRP6LPSVRQ6WURQJ7LH&RPSDQ\,QF ,QSXWGDWDDQGUHVXOWVPXVWEHFKHFNHGIRUDJUHHPHQWZLWKWKHH[LVWLQJFLUFXPVWDQFHVWKHVWDQGDUGVDQGJXLGHOLQHVPXVWEHFKHFNHGIRUSODXVLELOLW\
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
&RPSDQ\
7+( 'DWH
(QJLQHHU
56 3DJH
3URMHFW
$GGUHVV
3KRQH
(PDLO
$QFKRU'HVLJQHU
6RIWZDUH
9HUVLRQ
6KHDU ORDG \
9XD\
OE
$QFKRU 7HQVLRQ ORDG
1XD
OE
5HVXOWLQJ$QFKRU)RUFHV
6KHDU ORDGFRPELQHG
¥
9 XD[
ð
9XD\
ð
OE
6KHDU ORDG [
9 XD[
OE
6XP
0D[LPXP FRQFUHWH FRPSUHVVLRQ VWUDLQ
Å
0D[LPXP FRQFUHWH FRPSUHVVLRQ VWUHVV
SVL
5HVXOWDQW WHQVLRQ IRUFH
OE
5HVXOWDQW FRPSUHVVLRQ IRUFH
OE
(FFHQWULFLW\ RI UHVXOWDQW WHQVLRQ IRUFHV LQ [D[LV H
1[
LQFK
(FFHQWULFLW\ RI UHVXOWDQW WHQVLRQ IRUFHV LQ \D[LV H
1\
LQFK
)LJXUH!
6WHHO6WUHQJWKRI$QFKRULQ7HQVLRQ
6HF
1VD
OE
I I1VD
OE
&RQFUHWH%UHDNRXW6WUHQJWKRI$QFKRULQ7HQVLRQ
6HF
1E N FODI¶FKHI
(T D
NF OD I¶F
SVL
KHI
LQ
1E
OE
I1FEJ I
$1F $ 1FR
<HF1<HG1<F1<FS11E
6HF (T E
$1F
LQ
$1FR
LQ
FDPLQ
LQ
<HF1 <HG1 <F1 <FS1 1E
OE
I I1FEJ
OE
3XOORXW6WUHQJWKRI$QFKRULQ7HQVLRQ
6HF
I1SQ I<F31S I<F3$EUJI¶F
6HF (T
<F3 $EUJ
LQ
I¶F
SVL
I I1SQ
OE
:/DV3RVLWDV%RXOHYDUG3OHDVDQWRQ&$
3KRQH
)D[
ZZZVWURQJWLHFRP6LPSVRQ6WURQJ7LH&RPSDQ\,QF ,QSXWGDWDDQGUHVXOWVPXVWEHFKHFNHGIRUDJUHHPHQWZLWKWKHH[LVWLQJFLUFXPVWDQFHVWKHVWDQGDUGVDQGJXLGHOLQHVPXVWEHFKHFNHGIRUSODXVLELOLW\
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
&RPSDQ\
7+( 'DWH
(QJLQHHU
56 3DJH
3URMHFW
$GGUHVV
3KRQH
(PDLO
$QFKRU'HVLJQHU
6RIWZDUH
9HUVLRQ
5HVXOWV
,QWHUDFWLRQRI7HQVLOHDQG6KHDU)RUFHV
6HF'
"
7HQVLRQ )DFWRUHG /RDG 1 XD
OE
'HVLJQ 6WUHQJWK ¡1 Q
OE
5DWLR 6WDWXV
6WHHO
3DVV
&RQFUHWHEUHDNRXW
3DVV
*RYHUQV
3XOORXW 3DVV
$:67\SH$+HDGHG6WXGZLWKKHI LQFKPHHWVWKHVHOHFWHGGHVLJQFULWHULD :DUQLQJV
0LQLPXP VSDFLQJ DQG HGJH GLVWDQFH UHTXLUHPHQW RI GD SHU $&, 6HFWLRQV DQG IRU WRUTXHG FDVWLQSODFH DQFKRU LV ZDLYHG SHU GHVLJQHU RSWLRQ
3HU GHVLJQHU LQSXW GXFWLOLW\ UHTXLUHPHQWV IRU WHQVLRQ KDYH EHHQ GHWHUPLQHG WR EH VDWLVILHG ± GHVLJQHU WR YHULI\ 3HU GHVLJQHU LQSXW GXFWLOLW\ UHTXLUHPHQWV IRU VKHDU KDYH EHHQ GHWHUPLQHG WR EH VDWLVILHG ± GHVLJQHU WR YHULI\ 'HVLJQHU PXVW H[HUFLVH RZQ MXGJHPHQW WR GHWHUPLQH LI WKLV GHVLJQ LV VXLWDEOH
:/DV3RVLWDV%RXOHYDUG3OHDVDQWRQ&$
3KRQH
)D[
ZZZVWURQJWLHFRP6LPSVRQ6WURQJ7LH&RPSDQ\,QF ,QSXWGDWDDQGUHVXOWVPXVWEHFKHFNHGIRUDJUHHPHQWZLWKWKHH[LVWLQJFLUFXPVWDQFHVWKHVWDQGDUGVDQGJXLGHOLQHVPXVWEHFKHFNHGIRUSODXVLELOLW\
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
SAFE MODEL CALCULATIONS
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Dead Load
Loading Diagrams
Additional Surface Dead Load of 10psf not shown
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Live Load
Additional Surface Live Load of 40psf not shown
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Wind Load
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Seismic Load
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Design Strips
Design Strip Layer A
Design Strip Layer B
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Required Reinforcement
Top Mat
Bottom MatApproved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Controlling Stress Diagram
Load Combination: 1.2D+1.0L+EQx+0.3Wy
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
TThe following Engineering Calculations were
done by ACH Consulting Engineers and are
for reference only.
AAPPENDIX
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
FOR REFERENCE ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
FOR
REFERENCE
ONLY
3UHVVDOLW'DQLDZLWKRSHQIURQWZLWKRXWFRYHU
6WDQGDUGWRLOHWVHDWZLWKRSHQIURQWZLWKRXWFRYHULQFOKLQJHLQ VWDLQOHVVVWHHO
,WHPQXPEHU 81
($1
3UHVVDOLW'DQLD
ZLWKRSHQIURQW
ZLWKRXWFRYHU7KH
VHDWOHDYLQJWKHLQQHUVLGHZLWKDQHYHQVPRRWKVXUIDFH ,WQRWRQO\ORRNVJRRGLW
VDOVRHDV\WRFOHDQ
&RORU :KLWH
'HVFULSWLRQ
3UHVVDOLW WRLOHW VHDW ZLWKRXW FRYHU PRGHO 'DQLD ZLWK
RSHQ IURQW DUW QR PDGH RI FRORU LQJUDLQHG
GXURSODVW ZLWK 81 VWDLQOHVV VWHHO KLQJHV
FHQWUH GLVWDQFH
PP
ORDG ULQJ VHDW
OEV
VXLWDEOH IRU DOO URXQG IURQW WRLOHWV
\HDU JXDUDQWHH
'HVLJQHU 3UHVVDOLW
'HVLJQ\HDU
0DWHULDOV 72,/(7 6($7
7KH PDWHULDO LV FRORXU LQJUDLQHG GXURSODVW
8) $ XUHD IRUPDOGHK\GH
WKDW
FRQWDLQV QR HQYLURQPHQWDOO\ KD]DUGRXV VXEVWDQFHV 8) SODVWLF FRPSULVHV XUHD IRUPDOGHK\GH UHVLQ FHOOXORVH DV ZHOO DV PLQHUDOV SLJPHQWV OXEULFDQWV DQG PRLVWXUH FRQWHQW 7KH UDZ PDWHULDO IURP WKH VXSSOLHU FRQWDLQV XS WR IUHH IRUPDOGHK\GH DQG HYHQ OHVV IROORZLQJ FXULQJ
%8))(56
(9$
FRSRO\PHU PDGH RI HWK\OHQH DQG YLQ\O DFHWDWH
'$03(5 .,7
RQO\ UHOHYDQW IRU WRLOHW VHDWV ZLWK VRIW FORVH
+\GUDXOLF GDPSHU ZLWK VWDLQOHVV VWHHO GDPSHU FDVLQJ DQG WKHUPRSODVWLF SDUWV 02817+,1*(6
6WDLQOHVV VWHHO PRGHO : QR 0 DQG WKHUPRSODVWLF 3URGXFWFDSDFLW\ /RDGULQJVHDWNJ
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
3UHVVDOLW'DQLDZLWKRSHQIURQWZLWKRXWFRYHU
6WDQGDUGWRLOHWVHDWZLWKRSHQIURQWZLWKRXWFRYHULQFOKLQJHLQ VWDLQOHVVVWHHO
:HLJKW
NJ
&DUWRQVL]H [
[PP
*URVVZHLJKW
NJ
&UDWHVL]H
[[PP
:HLJKWSHUFUDWH NJ
4W\SHUFUDWH
&UDWHVSHUSDOOHW
4W\SHUSDOOHW
&OHDQLQJ 8VHDPLOGVRDSVROXWLRQWRFOHDQWKHVHDW3OHDVHWDNHFDUHWKDWWKHVHDWDQGKLQJHVDUH QRWOHIWGDPS'U\RIIDQ\UHVLGXDOZDWHURUFOHDQLQJDJHQWZLWKDVRIWFORWK$YRLG FRQWDFWRIWKHVHDWDQGKLQJHVZLWKDEUDVLYHFRUURVLYHRUFKORULQHEDVHGFOHDQHUVDV WKHVHPD\FDXVHGDPDJHRUOHDGWRIODVKUXVW7KHUHIRUHZKHQFOHDQLQJWKHERZOPDNH VXUHWKDWWKHVHDWDQGFRYHUDUHNHSWLQDQXSULJKWSRVLWLRQXQWLODOOFOHDQLQJDJHQWKDV EHHQIOXVKHGDZD\
:DUUDQW\ <RXU3UHVVDOLWWRLOHWVHDWLVVXEMHFWWRD\HDUSURGXFWZDUUDQW\DJDLQVWSUHVHQWDWLRQRI UHFHLSW<RXVKRXOGFRQWDFWWKHGHDOHURUVWRUHZKHUH\RXSXUFKDVHGWKHVHDWLQWKH HYHQWRIDFRPSODLQWEU!EU!,QWKHHYHQWRIFRPSODLQWVDERXWGHIHFWLYHPDWHULDOVDQGR U
PDQXIDFWXULQJGHIHFWVDQGRUIXQFWLRQDOOLPLWDWLRQVDVFHUWDLQHGZLWKLQD\HDUSHULRG IROORZLQJSURSHUXVHDQGFOHDQLQJRIWKHWRLOHWVHDW
ZHUHVHUYHWKHULJKWWRH[DPLQHWKH
WRLOHWVHDWDWRXUIDFWRU\
3UHVVDOLWZLOOGHOLYHUVSDUHSDUWVRUUHSODFHWKHWRLOHWVHDWE\DQ LGHQWLFDORUVLPLODUPRGHO,IWKHFRORULVQRORQJHUDYDLODEOH3UHVVDOLWUHVHUYHVLWVULJKWWR UHSODFHWKHWRLOHWVHDWE\DVLPLODUPRGHOLQWKHFRORUZKLWH8SRQUHSODFHPHQWRUGHOLYHU\ RIDVSDUHSDUWWKHZDUUDQW\SHULRGZLOOQRWEHH[WHQGHGQRUUHQHZHG,IUHSODFHPHQWLV QRWSRVVLEOH3UHVVDOLWPD\LQVWHDGUHIXQGWKHSXUFKDVHSULFH 6XEMHFWWRFKDQJHVLQWKHSURGXFWUDQJHWHFKQLFDOFKDQJHVDQGSULQWLQJHUURUV ZZZSUHVVDOLWFRP
3UHVVDOLW$6
3UHVVDOLWYHM
'.5\
7HO
)D[
(PDLO
SUHVVDOLW#SUHVVDOLWFRP
Approved for Commercial
Approved by: State of California
MH DAA #DM1507408
Intertek (IntertekͲATI)
Plan Approval: #RͲ20690
Approval Date:11/15/2022
Expiration Date: 02/14/2024
Without Foundation Approval
1748 33rd Street
Orlando, FL 32839
Item VOC Limit
VOC Limit
California Green Building Standards
Code SECTION 5.5
Complies (Y/N) Data Sheet
Brand Item Description SKU Grams / Liter Grams / Liter Y/N Y/N Sika Flex Black Glue 221 25 50 Y Y
Sika Flex White Glue 221 25 50 Y Y
Duraflex Tile Adhesive 1 65 Y Y
Mapei Kerapoxy grout 7 65 Y Y
Ardex Tile Primer 20L: 10155 41 65 Y Y
Oatley PVC Cement PVC Clear Cement 510 550 Y Y
Oatley PVC Primer PVC Clear Primer 550 550 Y Y
Oatley PVC Cleaner PVC Cleaner 25 550 Y Y
Item VOC Limit
VOC Limit
California Green Building Standards
Code SECTION 5.5
Complies (Y/N) Data Sheet
Brand Item Description SKU Grams / Liter Grams / Liter Y/N Y/N Liquid Flash 1 Waterproofing 250 250 Y Y
Dribond Primebond 9318466001709 50 250 Y Y
Mapesil AC Silicone Manhattan 2000 18.5 250 Y Y
Mapesil AC Silicone Antartica 18.5 250 Y Y
Maxisil Silicone A15 Aluminium 34 250 Y Y
Sika Multiprimer Marine UN1866 663 775 Y Y
Item VOC Limit
VOC Limit
California Green Building Standards
Code SECTION 5.5
Complies (Y/N) Data Sheet
Brand Item Description SKU Grams / Liter Grams / Liter Y/N Y/N Carboline Carbozinc 858 Grey 104653A18 318 340 Y Y
Carboline CZ859 Epoxy Zinc Rich 108304G18 326 340 Y Y
Resene Concrete Primer D405 40 250 Y Y
Carboline Carboguard 690 Titania 107894F18 170 250 Y Y
Resene Lustacryl D310 63 250 Y Y
ADHESIVE PRODUCTS
SEALANT PRODUCTS
ARCHITECTURAL COATINGS
Approved for Commercial
Approvedby:StateofCalifornia
MHDAA#DM1507408
Intertek(IntertekͲATI)
PlanApproval:#RͲ20690
ApprovalDate:11/15/2022
ExpirationDate:02/14/2024
Without Foundation Approval
174833rdStreet
Orlando,FL32839
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
G
JUPITER TWIN ACCESSIBLE USA
EXELOO JUPITER TWIN ACCESSIBLE - DRAWING SCHEDULE
SHEET # DESCRIPTION REVISION
G1 FINISHES SCHEDULE 1-H
G2 STANDARD DETAILS N/A
G3 FRONT PERSPECTIVE N/A
G4 REAR PERSPECTIVE 1-H
B5 ELEVATIONS 1-H
B6 FLOOR PLAN 1-H
B7 SECTION A-A 1-H
B8 SECTION B-B 1-H
B9 SECTION C-C 1-H
B10 SECTION D-D 1-H
B11 SCHEMATIC SERVICES PLAN 1-H
B12 POWER - ONE LINE DIAGRAM 1-H
P13 JUPITER TWIN ACCESSIBLE WASTEWATER SYSTEM 1-C
P14 WATER SUPPLY DIAGRAM 1-H
P15 WATER SUPPLY VALVE TRAIN 1-A
G16 SIGN DOOR ASSEMBLY USA - ADA 1-A
G17 ACCESSIBLE RESTROOM DOOR SIGN 1-A
B18 FLOOR SLAB - PLAN & SECTION 1-A
B19 FLOOR SLAB - REINFORCING DETAIL 1-A
B20 FLOOR SLAB - FOUNDATION PLAN 1-O
S21 STEEL FRAME - B.O.M - FRONT 1-H
S22 STEEL FRAME - B.O.M - REAR 1-H
S23 STEEL FRAME - ELEVATIONS & PLAN 1-H
S24 STEEL FRAME - ELEVATIONS 1-H
S25 STEEL FRAME - ELEVATION & DETAILS 1-H
S26 STEEL FRAME - SWING DOOR OPTION 1-H
S27 STEEL FRAME - WELD DETAILS, FOUNDATION DETAILS 1-H
B28 AUXILIARY CONTROL BOX LAYOUT 1-H
B29 MAIN CONTROL BOX LAYOUT 1-H
B30 MAX LOAD TABLE 1-H
B31 ELECTRICAL PANEL SCHEDULE - TWIN BOX 1-H
B32 APRON DETAIL 1-H
THIS DRAWING SET COVERS:
1. JUPITER 22DD - AUTOMATIC TWIN ACCESSIBLE
2. JUPITER 32DD - SEMI-AUTOMATIC TWIN ACCESSIBLE
3. JUPITER 42/52DD - MANUAL TWIN ACCESSIBLE
REFER TO EXELOO QUALITY ASSURANCE MANUAL FOR
FIT-OUT OPTIONS
PROJECT DATA:
ADDRESS: STATEWIDE APPROVAL
CODES & STANDARDS:
2019 CALIFORNIA BUILDING CODE (BASED ON THE 2018 IBC)
2019 CALIFORNIA MECHANICAL CODE (BASED ON THE 2018 UMC) 2019 CALIFORNIA PLUMBING CODE (BASED ON THE 2018 UPC)
2019 CALIFORNIA ELECTRICAL CODE (BASED ON THE 2017 NEC) 2019 CALIFORNIA GREEN BUILDING STANDARD CODE (CGBSC)
2019 CALIFORNIA ENERGY CODE
BUILDING INFO:
BLDG USE: PUBLIC RESTROOM
BLDG OCCUP: B
OCCUPANT LOAD: 1/PER STALL
CONSTRUCTION TYPE: (IBC 602) TYPE V-B
BLDG AREA: 135 SF (TABLE 506.2 ALLOWED 9,000 SF)
BLDG HTG: 9'-0" SINGLE STORY
EXITS REQD: 1/STALL
EXITS PROVIDE: 1/STALL
FIRE SUPRESSION: NON-SPRINKLERED
APPLICABLE LOADS:
ROOF LIVE LOAD: 20
DEAD LOAD: 10
SNOW LOAD: 20
FLOOR LOAD: 40
WIND SPEED: 115
EXPOSURE: C
SEISMIC DESIGN CATEGORY: E
RISK CATEGORY: 2
BLDG HVAC: N/A
NOTE:
1. THIS IS A NON-CONDITIONED BUILDING
2. THIS BUILDING HAS NOT BEEN DESIGNED FOR WILDFIRE
LOCATIONS (WUI)
3. SNOW LOADING NOT CONSIDERED IN THIS DESIGN
1. SOILS INFORMATION
A. NO SOILS REPORT PROVIDED. THE FOLLOWING IS AN
ASSUMED VALUE:
1. DESIGN SOIL BEARING CAPACITY = 1500 psf
2. THE FOUNDATION IS DESIGNED PER IBC MINIMUM
STANDARDS.
B. WITHOUT A SOILS REPORT THOM HUME CONSULTING
ENGINEERS CANNOT BE RESPONSIBLE FOR FOUNDATION
SETTLEMENTS OR MOVEMENTS.
C. MAINTAIN BOTTOM OF FOOTING SUCH THAT THE
HORIZONTAL DISTANCE TO DAYLIGHT IS 40'-0" AND PER SEC
1808.7.2 OF CURRENT CBC EDITION.
2. FOUNDATION INFORMATION
A. CONCRETE:
A.A. MAXIMUM 28-DAY STRENGTH OF 3,000 psi
A.B. MAXIMUM WATER TO CEMENT RATIO OF 0.57
A.C. MAXIMUM AGGREGATE SIZE OF 1"
A.D. SLUMP OF 4" ±1"
A.E. NO SPECIAL INSPECTION REQUIRED
B. REINFORCING:
B.A. ALL REINFORCING SHALL BE ASTM A-615 GRADE 60
B.B. CLEAR COVER TO ALL REBAR SHALL BE 3"
0000 CODES AND REFERENCES
ALL GENERAL STRUCTURAL NOTES AND SPECIFICATIONS
REFLECT THE PROVISIONS OF THE:
2019 CBC (CALIFORNIA BUILDING CODE)
ACI 318-14 (CONCRETE)
AISC 360-16/AISC-16/AISC 358-16 (STEEL)
WORK COMPLETED AT EXELOO FACTORY:
1. PRE-FABRICATED TOILET UNIT - CONCRETE SLAB, STEEL FRAME
STRUCTURE,
WALL CLADDING, INTERNAL WALLS, RESTROOM FITTINGS, ROOF &
FLASHINGS (REMOVED FOR TRANSPORT)
2. PLUMBING & ELECTRICAL WORK
NOTES:
1. RESTROOM MANUFACTURER WILL DELIVER RESTROOM TO SITE AND CRANE ONTO GRADE BEAMS.
2. CONTRACTOR TO CONSTRUCT GRADE BEAMS AND BASE, EXTEND
EXISTING UTILITIES AND PROVIDE FINAL CONNECTIONS (SANITARY SEWER, WATER AND ELECTRICAL).
3. CONTRACTOR TO INSTALL PREFABRICATED FOAM CORE ROOF PANELS AND FLASHING PER MANUFACTURER'S INSTRUCTIONS.
4. CONTRACTOR TO BE RESPONSIBLE FOR PROPER DISPOSAL OF ALL
SPOILS AND SITE GENERAL RESTORATION AND CLEAN-UP (NOT INCLUDING TURF ESTABLISHMENT).
5. RESTROOM MANUFACTURER WILL TEST FINAL OPERATION OF FACILITY
AND REMOTE COMMUNICATION
11/8/22
Jeff Funkhouser, P.E.
Digitally signed by Jeff Funkhouser, P.E.
Date: 2022.11.08 10:18:12 -05'00'
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
1 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
G
STRUCTURAL
# ITEM SUPPLIER DETAIL SPECIFICATION
1 Floor Stresscrete Steel Reinforced concrete Slab thickness 6 5/16"/5 1/8" steel reinforced concrete 2 Walls Galvanised steel frame Electro Plated Duragalv 3/16" & 1/8" thick electroplated galvanised steel 3 Roof Frame Galvanised steel frame Electro Plated Duragalv 3/16" & 1/8" thick electroplated galvanised steel
EXELOO FINISHES SCHEDULE
EXTERIOR LININGS
# ITEM SUPPLIER DETAIL SPECIFICATION
4 Wall Cladding Fibre Cement Solutions Ltd Eterpan MD Fibre cement sheet 1/2" & 11/16" Fibre cement laminated sheet 5 Roof MetalCraft MetecnoSpan (PIR)
3-1/8" panel M 4880 Approved Class 1 - Unlimited Height. FM 4881 Approved Class 1 - Unlimited Height. FM 4471 Approved Class 1 -External roof and wall endurance standard.
6 Gutter & Flashings Steel & Tube Coloursteel 10 -15 years warranty under right maintenence plan 7 Vent Pipes Ferguson Schedule 40 PVC or ABS Pipe &
Fittings 4” Schedule 40 PVC or ABS pipe and fittings for drain waste and vent applications 8 Doors Cavity Sliders Stainless steel T316 Brushed Stainless steel sheet skin with alloy interior 9 Paint Altex Epoxy 2 part paint 5 - 10 years warranty under the right maintenance plan 10 Grills Exeloo Solid grills cut and folded by Exeloo T316 Stainless Steel Brushed #4
INTERIOR LININGS
# ITEM SUPPLIER DETAIL SPECIFICATION
11 Wall Cladding Fibre Cement Solutions Ltd Eterpan MD Fibre cement sheet 1/2" & 11/16" Fibre cement laminated sheet 12 Floor Finish Cutting Edge Tiling Brasil Nero Charcoal Ceramic Non Slip tiles 17 11/16" x 17 11/16" 14 Wall linings - Toilet/Shower Cutting Edge Tiling Sanctuary Cool White Ceramic tiles 11 13/16" x 23 5/8"
ELECTRICAL FITTINGS
# ITEM SUPPLIER DETAIL SPECIFICATION
16 Control Box PLC Power PLC Control Box Proface LT3300-T
PLUMBING FITTINGS
# ITEM SUPPLIER DETAIL SPECIFICATION
19 Toilet pans Stoddart Stainless steel 23 5/8" - 27 9/16" stainless pans. 20 Zurn Valve MacDonald Industries Flushing system 1.28gal (4.8L) max. per flush 21 Water supply system Mico
Stainless steel crimp ring plumbing
system
RIIFO Rifeng Pex Pipe & MLP (multilayer pipes) – DZR Universal Fittings 22 Waste water system (DWV) Ferguson Schedule 40 PVC or ABS Pipe and Fittings
1-1/2” to 4” Schedule 40 PVC or ABS pipe and fittings for drain waste and vent applications
23 WS 400 Duraclenz Stainless Steel recessed unit
Soap, Water & hand dryer built in wash station, Lavatory Faucet 0.5gpm (max.) @ 60psi (1.9L/m @ 414kPa)
24 Flush Valve Water Solenoid SMC SIRAI L177B04 PS = 30 bar
HARDWARE
# ITEM SUPPLIER DETAIL SPECIFICATION
25 Door hardware Legge Legge 800 Series Forged Brass and 10 year warranty 26 Grab rails Superquip Stainless Steel 1 1/4" knurled stainless grab rails
SEATING & TABLES
# ITEM SUPPLIER DETAIL SPECIFICATION
27 Baby Change table Duraclenz Stainless Steel & fibreglass inserts Weight limit 187lbs
ACCESSORIES
# ITEM SUPPLIER DETAIL SPECIFICATION
30 Floor Dry Fans Fantech CEG MN80C2 - 0MLT 1.5kw 230V
31 Extract Fans Fantech Fantech FR150 USA 120V CFM 263
32 Exterior Lights Dualcom Technology Ltd Battenpro-300-12V LED SMD2835 1000Lm 10W IP65 33 Interior Lights Dualcom Technology Ltd Battenpro-600-12V LED SMD2835 2000Lm 20W IP65 34 Speakers VEXX For music & instruction 5" speaker
35 Security System Intergrated Consulting Dahua Starlight pinhole camera 2MP HDCVI covert camera with 3.6mm lens 36 Paper Dispenser Duraclenz Stainless Steel EMD8200RH Dual roll holder 37 Nappy / Sani chute Duraclenz Hinged flap chute Stainless Steel T304 Brushed 11/8/22
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
2 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
G
STANDARD DETAILS
11/8/22
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
3 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
G
JUPITER | TWIN ACCESSIBLE | USA
REV DESCRIPTION DATE
1-H CONTROL BOX, AUX CONTROL BOX LAYOUT & LOAD TABLE 15/010/2020 1-G BABY CHANGE TABLE & HAND RAIL COMPLIANCE 05/08/2020 1-F PLAN REVISION AS PER HCD MARKUP 11/6/2020 10/07/2020 1-E INCREASE SLAB 2in (50mm) OVERALL 03/04/2020
1-D PLAN REVISION AS PER HCD MARKUP 15/8/2019 30/08/2019 1-C ELONGATED TOILET PANS 03/12/2018
1-B 700mm PANS 14/11/2018
1-A UPDATED FROM COMMENTS 18/10/2018 18/10/2018
11/8/22
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
4 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
G
REAR PERSPECTIVE
11/8/22
4. FRONT ELEVATION 2. R-H ELEVATION
3. REAR ELEVATION 1. L-H ELEVATION
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
5 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
SL SL
2551.7 m
m
[100
1 2 in]
2791.8 m
m
[109
7 8 in]
5525 mm
[2171 2 in]
SLAB
255.5 mm
[10 in]
576.4 mm
[223 4 in]
843.1 m
m
[33
1 4 in]
SIGN FRAME WITH
BRAILLE & TACTILE
SIGNAGE AS PER ADA
SEE DETAILS SHEET, G15
CLEAR OPENING
AS PER CBC 11B-404.2.3
(B) SLIDING DOOR
CLEAR OPENING
SERVICE DOOR
LOCK MECHANISM:
ILCO 201 L/S CYLINDER
WITH LOCKWOOD 100
NIGHTLATCH
FFL
REINFORCED PC
CONCRETE SLAB
FFL FFL
2921.4 m
m
[115 in]
THE UNISEX GEOMETRIC SYMBOL WITH THE PICTOGRAM,
RAISED CHARACTERS AND GRADE II BRAILLE IS LOCATED
FOR CLEAR AND SAFE ACCESS AND MOUNTED ADJACENT
TO THE PUBLIC RESTROOM ACCESSWAYS.
STAINLESS STEEL LOUVRE
VENTILATION GRILL
FFL
ACCESSIBLE RESTROOM
DOOR SIGN AS PER
CBC SECTION
11B-703.7.2.6,1,2,3,4
& 11-B-703.3,1,2
SEE STANDARD DETAILS, G16
130 m
m
[5
1 8 in]
5549 mm
[2181 2 in]
OVERALL
GENERATOR SOCKET WITH
CHANGE OVER SWTICH
(AS REQUIRED)
2400 m
m
[94
1 2 in]
2275 mm
[895 8 in]
SLAB
EXTERIOR CLADDING:
SEE REAR ELEVATION
EXTERIOR CLADDING:
SEE REAR ELEVATION
1498.6 m
m
[59 in]
899 mm
[353 8 in]
899 mm
[353 8 in]
B-B
B8
EXTERIOR CLADDING:
SEE REAR ELEVATION
NOTE:
NO BRAILLE ON SIGNS OR BUTTONS
BETWEEN FFL & 48" ABOVE FFL
385 mm
[151 8 in]
385 mm
[151 8 in]
2309 mm
[907 8 in]
LED LIGHT
EXTERIOR CLADDING:
COMPRESSED SHEET
FIXED WITH CLASS 4 TEK
SCREWS TO SUPAGAL
RHS FRAMING JOINS
SEALED WITH
BUTYL INSEAL TAPE
VENTILATION GRILL
SEE R-H ELEVATION
REINFORCED PC
CONCRETE SLAB
ELECTRONICALLY CONTROLLED
AUTO OPENING & CLOSING CAVITY
SLIDING DOOR (FAIL SAFE DOOR
CAN BE MANUALLY OPENED IN EMERGENCY).
LOCK MECHANISM: DUNKER MOTOR
WITH BRAKE. MILES NELSON RECESSED FLUSH PULL
HANDLE ON INSIDE OF DOOR IN CASE OF
POWER FAILURE. REQ'D FORCE TO OPEN
DOOR W/O POWER IS 32N
- SEE "TESTING OF CS FOR DOORS" TEST SHEET
ELECTRONICALLY CONTROLLED
AUTO OPENING & CLOSING CAVITY
SLIDING DOOR (FAIL SAFE DOOR
CAN BE MANUALLY OPENED IN EMERGENCY).
LOCK MECHANISM: DUNKER MOTOR
WITH BRAKE. MILES NELSON RECESSED
FLUSH PULL HANDLE ON INSIDE OF
DOOR IN CASE OF POWER FAILURE.
REQ'D FORCE TO OPEN DOOR W/O
POWER IS 32N - SEE "TESTING OF
CS FOR DOORS" TEST SHEET
4°
ROOFING: 31 8" METECONOSPAN (PIR) STRUCTURAL
INSULATED PANEL FIXED WITH STEEL TITE HWF CLASS 5 14g
14x150mm TEK SCREW WITH AS 3566/EPDM SEAL,
PAINTED GALVANISED PROFILE WASHER & 30mm EPDM
WASHER ON 75mm SHS SUPAGAL ROOF RAFTERS ALL
FLASHINGS .55mm ZM8 3001.5 mm
[1181 8 in]
11/8/22
FLOOR PLAN
DETAIL A
FLOOR GRATE SURFACE
( 1 : 3 ) SECTION E-E
DOOR THRESHOLD
A
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
6 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
SERVICE
AREA
ADA COMPLIANT
RESTROOM
ADA COMPLIANT
RESTROOM
n1524 mm
[n60 in]
n1524 mm
[n60 in]
DIAPER/SANITARY
DISPOSAL BIN
SENSOR OPERATED
WASH BASIN
FLOOR GRATE
PAPER DISPENSER
UNDER BASIN AS PER
CBC 11B-306 KNEE
TOE CLEARANCE
1640 m
m
[64
5 8 in] I/S
1640 m
m
[64
5 8 in] I/S
2162.9 mm
[851 8 in]
I/S 2162.9 mm
[851 8 in]
I/S
SLSL
CONTROL BOX
(60A, 120/240V SPLIT)
DOMINANT
DIRECTION
OF TRAVEL
17 M
IN.
762 mm
[30 in]
1219.2 m
m
[48 in]
919 mm
[361 8 in]
S/S RECESSED
BABY CHANGE TABLE
457.2 m
m
[18 in]
457.2 m
m
[18 in]
TOILET PAN AS PER
2019 CBC, §604.2
SEAT IS NON-
ABSORBENT, ELONGATED
& OPEN FRONT
PRESSALIT DANIA WITH OPEN
FRONT W/O COVER 72
SERVICE DOOR
17 M
IN.
WHITE TILE
INTERIOR WALLS
A-A B7
B9
C-C
D-D
B10
902.5 mm
[351 2 in]
CLEAR 902 mm
[351 2 in]
CLEAR
B-B
B83/B5
1/B5
4/B5
2/B5
DISPOSAL BIN
OPENS FROM REAR
(CLEANER ACCESS FROM
SERVICE AREA)
PC CONCRETE
FLOOR SLAB
FLOOR DRAIN
FLOOR TILES
DOOR JAMB
48 MIN.
THESHOLD
(
1 2 MAX.) AS PER CBC
11B-404.2.5
B6
E-E
177.8 mm
[7 in]
177.8 mm
[7 in]
LINE OF PAPER DISPENSER
AS PER CBC 11B-604.7
14.6 mm
[5 8 in]
PROTRUSION INTO
CIRCULATION PATH
AS PER CBC, 11B-307.2
PROTRUSION LIMITS
LINE OF BABY
CHANGE TABLE
AS PER CBC
11B-226.4 BABY
CHANGE TABLES
KNURLED STAINLESS
STEEL GRAB BAR
812.8 mm
[32 in]
POSITION OF
INTERNAL LED
LIGHT
-SEE B7, B8
& B10
LED LIGHT FOR
SERVICE AREA
-60 MINUTE BATTERY
BACK UP IN CASE
OF POWER FAILURE
GENERATOR SOCKET WITH
CHANGE OVER SWTICH
(AS REQUIRED)
WHITE TILE
INTERIOR WALLS
5551 mm
[2181 2 in]
CLADDING
56 mm
[21 4 in]
5.5 m
m
[1 4 in]
5.5 m
m
[1 4 in]
1387.1 mm
[545 8 in]
762 mm
[30 in]
914.4 m
m
[36 in]
REQUIRED CLEAR SPACE
30"x36"
38 m
m
[1
1 2 in]
38.1 mm
[11 2 in]
457.2 m
m
[18 in]
138.4 m
m
[5
1 2 in]
353.7 mm
[137 8 in]
38.1 mm
[11 2 in]
38 m
m
[1
1 2 in]
152.4 mm
[6 in]
LOCATION OF
WASH SOLENOIDS
COMPLIES TO
DEDICATED ELECTRICAL
SPACE AS PER NEC
110.26(E)(1)
LOCATION OF VALVE
TRAIN COMPLIES TO
DEDICATED ELECTRICAL
SPACE AS PER NEC
110.26(E)(1)
-SEE P14 FOR DETAILS
60 m
m
[2
3 8 in]
11/8/22
TOP VIEW
SECTION A-A
A
A
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
7 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
RECESSED ELECTRIC
PAPER DISPENSER
AS PER CBC,
§11B-603.5.
CONCRETE
SLAB BASE
RECESSED SENSOR
OPERATED
WASH BASIN
LAVATORY FAUCET WITH
AUTO SENSOR 0.5GPM
(MAX.) @ 60 PSI
AUTO SOAP
DISPENSER ZONE
AUTO DRIER
ZONE
871.4 m
m
[34
1 4 in]
SERVICE
AREA
145.1 mm
[53 4 in]
145.1 mm
[53 4 in]
1230.1 m
m
[48
3 8 in]
VENT
738.2 m
m
[29
1 8 in]
S/S FAN COVER
FFL
SENSOR RANGES
AT 40in AFF
TOILET AS PER
CBC, §604.2
SPRAY NOZZLE
CONTROL BOX
(60A, 120/240V SPLIT) ADA COMPLIANT
RESTROOM
ADA COMPLIANT
RESTROOM
457.2 mm
[18 in]
870 mm
[341 4 in]
2870.7 mm
[113 in]
457.2 mm
[18 in]
870 mm
[341 4 in]
762 m
m
[30 in]
762 m
m
[30 in]
FLOOR SLOPE AS PER
CBC 11B-403.3
NOT STEEPER THAN 1:20
NOTE:
NO BRAILLE ON SIGNS OR BUTTONS
BETWEEN FFL & 48" ABOVE FFL
GRAB BAR AT
HORIZONTAL
POSITION AS PER
CBC, 11B-609.4.
1371 mm
[54 in]
FFL
BATTENPRO
600-12V
LED LIGHT
BATTENPRO
600-12V
LED LIGHT
WHITE TILE
INTERIOR WALLS
WHITE TILE
INTERIOR WALLS
1218.2 mm
[48 in]
152.8 mm
[6 in]
152.4 mm
[6 in]
965.9 m
m
[38 in]
REQUIRED CLEAR SPACE
762 mm
[30 in]
1981.2 m
m
[78 in]
778.8 m
m
[30
5 8 in]
765.7 m
m
[30
1 8 in]
1371 mm
[54 in]
1218.6 mm
[48 in]
UNDER BASIN AS PER
CBC 11B-306 KNEE
TOE CLEARANCE
ROOFING: 31 8" METECONOSPAN (PIR) STRUCTURAL
INSULATED PANEL FIXED WITH STEEL TITE HWF CLASS 5 14g
14x150mm TEK SCREW WITH AS 3566/EPDM SEAL,
PAINTED GALVANISED PROFILE WASHER & 30mm EPDM
WASHER ON 75mm SHS SUPAGAL ROOF RAFTERS ALL
FLASHINGS .55mm ZM8
ALL PIPES AND DUCTS ARE
CLEAR OF THE DEDICATED
ELECTRICAL SPACE AS PER
NEC 110.26.(E)(1)
864.2 m
m
[34 in]
18" W x 30" D GRADE
BEAM W/3-#5
T&B & #3 TIES
@ 12" OC TYP
18" W x 30" D GRADE
BEAM W/3-#5
T&B & #3 TIES
@ 12" OC TYP
11/8/22
TOP VIEW
SECTION B-B
SECTION DETAIL U
PAPER DISPENSER-HANDRAIL GAP
B
B
U
U
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
8 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
STAINLESS STEEL
CHANNEL FLOOR DRAIN
152.4 mm
[6 in]
571 m
m
22 1 2 in
DISPOSAL BIN
MIRROR AS PER
CBC, 11B-603.3.
REAR GRAB BAR AT
HORIZONTAL
POSITION AS PER
CBC, 11B-604.5.2
S/S FAN COVER
FFL
RECESSED DISPENSER
WILL NOT IMPEDE WITH
CLEARANCE OF GRAB BAR
863 m
m
34 in
482 m
m
19 in
765.1 m
m
[30
1 8 in]
TOILET AS PER
CBC, §604.2
WHITE TILE
INTERIOR WALLS
CONTROL BOX
(60A, 120/240V SPLIT)
ADA COMPLIANT
RESTROOM
FLOOR SLOPE AS PER
CBC 11B-403.3
NOT STEEPER THAN 1:20
304.6 mm
[12 in]
MIN.
NOTE:
NO BRAILLE ON SIGNS OR BUTTONS
BETWEEN FFL & 48" ABOVE FFL
1 1 2" ALL ALONG
68.5 mm
[23 4 in]
4' HANDRAIL AT
HORIZONTAL
POSITION AS PER
CBC, §609.4
n32 mm
[n11 4 in]
BATTENPRO
600-12V
LED LIGHT
FFL
REQUIRED KNEE/TOE CLEAR SPACE
AS PER 11B-306
945.9 mm
[371 4 in]
SERVICE
AREA
279.4 mm
[11 in]
685.8 m
m
[27 in]
203.2 mm
[8 in]
228.6 mm
[9 in]
191.3 mm
[71 2 in]
152.4 mm
[6 in]
ROOFING: 31 8" METECONOSPAN (PIR) STRUCTURAL
INSULATED PANEL FIXED WITH STEEL TITE HWF CLASS 5 14g
14x150mm TEK SCREW WITH AS 3566/EPDM SEAL,
PAINTED GALVANISED PROFILE WASHER & 30mm EPDM
WASHER ON 75mm SHS SUPAGAL ROOF RAFTERS ALL
FLASHINGS .55mm ZM8
VENT PIPE RUN BEHIND
CONTROL BOX. ALL PIPES AND
DUCTS ARE CLEAR OF THE
DEDICATED ELECTRICAL
SPACE AS PER NEC 110.26.(E)(1)
18" W x 30" D GRADE
BEAM W/3-#5
T&B & #3 TIES
@ 12" OC TYP
11/8/22
TOP VIEW
SECTION C-C
PASSIVE AIR FLOW REQUIREMENT
CC
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
9 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
1001.5 m
m
[39
3 8 in]
386.4 m
m
[15
1 4 in]
140.5 mm
[51 2 in]
137.4 mm
[53 8 in]
386.4 m
m
[15
1 4 in]
1001.5 m
m
[39
3 8 in]
POSITION OF
EMERGENCY BUTTON
DOOR RELEASE BUTTON
REFER CBC, 11B-308.2.1
POSITION OF
EMERGENCY BUTTON
1205.3 m
m
[47
1 2 in]
COAT HOOK
AS PER CBC,
11B-603.4.
COAT HOOK
AS PER CBC,
11B-603.4.
1203.1 m
m
[47
3 8 in]
DOOR RELEASE BUTTON
REFER CBC, 11B-308.2.1
FFL FFL
SERVICE
AREA
SL SL
PASSIVE AIR FLOW
THROUGH LOUVRES
EXCEEDS THE MINIMUM
OF 7.3% OF THE FLOOR
SPACE AREA (MIN 5% REQUIRED).
ROOF
OUTSIDE
INSIDE
ADA COMPLIANT
RESTROOM
ADA COMPLIANT
RESTROOM
762 m
m
[30 in]
457.2 mm
[18 in]
868.7 mm
[341 4 in]
2873.2 mm
[1131 8 in]
457.2 mm
[18 in]
868.7 mm
[341 4 in]
762 m
m
[30 in]
NOTE:
NO BRAILLE ON SIGNS OR BUTTONS
BETWEEN FFL & 48" ABOVE FFL
17.9 mm
[3 4 in]
BABY CHANGE
IN LOWERED
POSITION
722.4 m
m
[28
1 2 in]
685.8 m
m
[27 in]
1347.3 m
m
[53 in]
348.4 mm
[133 4 in]
BABY CHANGE
TABLE AS PER
CBC 11B-226.4
BABY CHANGE
TABLES
813 mm
[32 in]
CLEAR WIDTH OF DOORWAY
AS PER CBC, 11B-404.3.1
CLEAR WIDTH
802.4 m
m
[31
5 8 in]
499.8 mm
[195 8 in]
S/S KNEE/TOE
KICK PLATE
BATTENPRO 300-12V
LED LIGHT FOR
SERVICE AREA
WHITE TILE
INTERIOR WALLS
MILES NELSON RECESSED
FLUSH PULL HANDLE ON
INSIDE OF DOOR TO OPEN IN
CASE OF POWER FAILURE
MILES NELSON RECESSED
FLUSH PULL HANDLE ON
INSIDE OF DOOR TO OPEN IN
CASE OF POWER FAILURE
18" W x 30" D GRADE
BEAM W/3-#5
T&B & #3 TIES
@ 12" OC TYP
18" W x 30" D GRADE
BEAM W/3-#5
T&B & #3 TIES
@ 12" OC TYP
11/8/22
TOP VIEW
SECTION D-D
DETAIL BZ
SIP PANEL FIXING INTO
ROOF BEAM (FRONT & REAR)
( 1 : 5 )
D
D
BZ
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
10 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
FFL
(LOW
ERED
BOTTOM
POSITION)
711.4 m
m
[28 in]
S/S RECESSED
BABY CHANGE TABLE
ADA COMPLIANT
RESTROOM
1°
FLOOR SLOPE AS PER
CBC 11B-403.3
NOT STEEPER THAN 1:20
48 M
AX.
762 m
m
[30 in]
129.6 m
m
[5
1 8 in]
2275 mm
[895 8 in]
REACH OF HANDLE
AS PER CBC 11B-309
NOTE:
NO BRAILLE ON SIGNS OR BUTTONS
BETWEEN FFL & 48" ABOVE FFL
688.4 m
m
[27
1 8 in]
CLEAR
761 mm
[30 in]
CLEAR
KNEE/TOE CLEAR SPACE
BATTENPRO 600-12V
LED LIGHT
WHITE TILE
INTERIOR WALLS
SERVICE
AREASTEELTITE HEX WASHER HEAD WITH SEAL,
CLASS 5 STEEL SELF DRILLER
ST14-14X150CLS5DSN &
BP 9082RWG GALV ROOFING WASHER FIXED INTO
3"x3"x
3 16"
SHS ROOF BEAM AT EVERY RIB
ROOFING: 31 8" METECONOSPAN (PIR) STRUCTURAL
INSULATED PANEL FIXED WITH STEEL TITE HWF CLASS 5 14g
14x150mm TEK SCREW WITH AS 3566/EPDM SEAL,
PAINTED GALVANISED PROFILE WASHER & 30mm EPDM
WASHER ON 75mm SHS SUPAGAL ROOF RAFTERS ALL
FLASHINGS .55mm ZM8
ROOFING: 31 8" METECONOSPAN (PIR) STRUCTURAL
INSULATED PANEL FIXED WITH STEEL TITE HWF CLASS 5 14g
14x150mm TEK SCREW WITH AS 3566/EPDM SEAL,
PAINTED GALVANISED PROFILE WASHER & 30mm EPDM
WASHER ON 75mm SHS SUPAGAL ROOF RAFTERS ALL
FLASHINGS .55mm ZM8
18" W x 30" D GRADE
BEAM W/3-#5
T&B & #3 TIES
@ 12" OC TYP
11/8/22
SCHEMATIC SERVICES PLAN
SECTION CB-CB
DEDICATED ELECTRICAL CLEAR SPACE
CB
CB
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Exeloo Corp. does not guarantee that information shown on these drawings indicate any more than the presence or absence of such services and will not accept liability for any damage or losses caused to any party, by the actions of the Contractor or its agents and subcontractors. The Contractor is required to make its own investigations, contact all service providers and verify the type and location of all services prior to commencement of any construction work on site.
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
11 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
MIN Ø1
1 4" ID WATER PIPE
TO WATER SUPPLY
(BY OTHERS)
ADA COMPLIANT
RESTROOM
MIN. 60 AMP 2 LEG
UNDERGROUND POWER SUPPLY
2" CONDUIT
Ø3" INTERNAL
DOWN PIPE
CONTROL BOX (60A, 120/240V SPLIT)
SERVICE
AREA
ADA COMPLIANT
RESTROOM
Ø2
1 2" FLOOR
DRAIN OUTLETS
(PRIMED BY FLOOR WASH SYSTEM)
C.O.
Ø4" VENT STACK
FROM GUTTER & DUCTED
BACK INTO SERVICE AREA
TYPICAL CONNECTION POINT
FOR UTILITY SERVICE
- ALL PLUMBING FIXTURES
ARE RUN UNDER 30"x36"
CLEAR SPACE TREAD PLATE
NOTE:
1. THIS DIAGRAM IS A VISUAL REPRESENTATION AND INDICATIVE ONLY - NOT TO SCALE
2. CIVIL CONTRACTOR/ENGINEER IS RESPONSIBLE FOR PROVIDING CONNECTIONS TO THE UNIT.
LOCATION OF FLOOR
DRAIN OUTLET
FLOOR DRAINS:
2 1
2" BSP MALE & 3" NPT FEMALE
ARE BOTH SUPPLIED BY EXELOO
STORM WATER LINE
AS REQUIRED
MAIN SEWER LINE
Ø2
1 2" FLOOR
DRAIN OUTLETS
(PRIMED BY FLOOR WASH SYSTEM)
VENT PIPE RUN BEHIND
CONTROL BOX. ALL PIPES AND
DUCTS ARE CLEAR OF THE
DEDICATED ELECTRICAL
SPACE AS PER NEC 110.26.(E)(1)
ALL PIPES AND
DUCTS ARE CLEAR OF THE
DEDICATED ELECTRICAL
SPACE AS PER NEC 110.26.(E)(1)
ALL PIPES AND
DUCTS ARE CLEAR OF THE
DEDICATED ELECTRICAL
SPACE AS PER NEC 110.26.(E)(1)
CONTROL BOX
TREAD PLATE WITH
30"x36" CLEAR SPACE
11/8/22
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
12 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
GROUND ROD PER NEC
PER GROUND
PER NEC
ISOLATING/
DISCONNECT
SWITCH
1 3
2 TRANSFORMER
MAINS
P1
60A
120/240V
1ɸ 3W
ONE LINE DIAGRAM
TWIN ACCESSIBLE
CONTROL BOARD
FEEDER SCHEDULE:
SIZE REQUIREMENTS TO MEET P1 CONTROL BOARD SPECIFICATIONS 11/8/22
ISOMETRIC - WASTEWATER JUPITER DD US
SINGLE UNDERSLAB FLOOR VENT
Parts List
MATERIALEXELOO DESCRIPTIONITEM
SCHEDULE 40 PVC OR ABS DWV2" STREET 451
SCHEDULE 40 PVC OR ABS DWV4" STREET 452
SCHEDULE 40 PVC OR ABS DWV4"x4"x4"x4" DOUBLE Y3
SCHEDULE 40 PVC OR ABS DWV4"x4"x2"x2" DOUBLE Y4
SCHEDULE 40 PVC OR ABS DWV4"x3" SANI TEE5
BY CONTRACTOR4"x4"x4"x4" DOUBLE SAN TEE6
BY CONTRACTOR4" COMBY7
BY CONTRACTOR4"x3"ADAPTOR COUPLING8
BY CONTRACTOR4" LONG SWEEP9
BY CONTRACTOR4" CLEANOUT SQUARE CAP10
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
JUP22DD-US-WASTE
SYSTEM
31/01/20201-C
13 JUPITER PLATINUM TWIN ACCESSIBLE US -
WASTEWATER SYSTEM
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
12/12/2019
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
P
BY OTHERS
(BELOW SLAB,
MATERIAL BY OTHERS)
BY EXELOO
2" LAVATORY WASTE
2" LAVATORY WASTE
4" WATER
CLOSET WASTE
4" WATER
CLOSET WASTE
P-TRAP
P-TRAP FOR LAVATORY DRAINS
- TO BE CONNECT INTO 4" VENT
STACK ABOVE TOILET DRAIN
FITTING AS A VERTICAL WET VENT
AS PER CPC §908.1
REV DESCRIPTION DATE
1-B NOTES AS PER BUREAU VERITAS MARK UP 29/01/2020 29/01/2020 1-C REMOVE FLOOR DRAIN VENTS, 3" FLOOR DRAINS, 2" LAVATORY WASTE PIPE @ 65" MAX LENGTH 31/01/2020 CPC §905.2.
WHERE VENTS CONNECT TO A HORIZONTAL
DRAINAGE PIPE, EACH VENT PIPE SHALL
HAVE ITS INVERT TAKEN OFF ABOVE THE
DRAINAGE CENTERLINE OF SUCH PIPE
DOWNSTREAM OF THE TRAP BEING SERVED.
MAX. 65" LONG @ Ø2"
MAX. 65" LONG @ Ø2"
4" FERNCO
CAST IRON & PLASTIC
FLEXIBLE COUPLING
(PROVIDED BY EXELOO)
4"
4"
4"
2"
2"
4" P-TRAP
4" P-TRAP
2 1
2" FLOOR DRAIN
OUTLETS
(PRIMED BY FLOOR WASH SYSTEM)
2 1
2" FLOOR DRAIN
OUTLETS
(PRIMED BY FLOOR WASH SYSTEM)
4"
4"
2' 6"
2' 6"
8'
5 4
1 3
2 7
6 8
VENT MUST CONNECT ABOVE FFL,
3" CAST IRON & PLASTIC
FLEXIBLE COUPLING
(PROVIDED BY EXELOO)
3" UNDERSLAB VENT
AS PER CPC §905.3
LINE OF TRANSITION
SCOPE OF WORK
LINE OF TRANSITION
SCOPE OF WORK
3" OR 3"x4" FERNCO
CAST IRON & PLASTIC
FLEXIBLE COUPLING
(SUPPLIED BY CONTRACTOR)
3" OR 3"x4" FERNCO
CAST IRON & PLASTIC
FLEXIBLE COUPLING
(SUPPLIED BY CONTRACTOR)
FLOOR DRAINS:
2 1
2" BSP MALE & 3" NPT FEMALE
ARE BOTH SUPPLIED BY EXELOO
4" CLEAN OUT TO
BE POSITIONED
OUTSIDE SERVICE BAY
SEE B11
10 1
1 2" LAVATORY WASTE
1 1
2" LAVATORY WASTE
VENT CONNECTION POINT
CONNECTION POINT OF VENT IS
ABOVE THE FLOOD LEVEL
OF THE TOILET PANS
NOTE:
1. THIS DIAGRAM IS A VISUAL REPRESENTATION AND INDICATIVE ONLY - NOT TO SCALE
VENT PIPE TO RUN BEHIND CONTROL BOX
- COMPLIES WITH DEDICATED ELECTRICAL
SPACE AS PER NEC 110.26(E)(1)
-SEE P14 FOR DETAILS
11/8/22
WATER SUPPLY SCHEMATIC PLAN
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
14 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
P
MIN Ø1
1 4" ID WATER PIPE
TO WATER SUPPLY
(BY OTHERS)
FLOOR WASH
SOLENOID
FLOOR WASH
SOLENOID
ZURN FLUSH
VALVEZURN FLUSH
VALVE
1 1
2" FLUSH PIPE 1
1 2" FLUSH PIPE
Ø1
1 4"
Ø1
1 4"Ø1
1 4"
Ø1
1 4"
Ø1
1 4"
Ø1
1 4"
Ø
13 16"
Ø
13 16"
Ø
13 16"
Ø
13 16"
Ø
13 16"
Ø
13 16"
Ø
5 8"Ø
5 8"
Ø
5 8"
1 1
4" /
13 16" / 1
1 4"
TEE
1 1
4" /
13 16" / 1
1 4"
TEE
1 1
4" /
5 8"
REDUCER 1
1 4" /
5 8" / 1
1 4"
TEE
W
ATER CLO
SET
BASINBASIN
VALVE TRAIN
SEE SHEET P15
SERVICE
AREA
ADA COMPLIANT
RESTROOMADA COMPLIANT
RESTROOM
NOTE:
1. THIS DIAGRAM IS A VISUAL REPRESENTATION AND INDICATIVE ONLY - NOT TO SCALE
2. ALL PIPES AND DUCTS ARE CLEAR OF THE DEDICATED ELECTRICAL SPACE AS PER NEC 110.26.(E)(1) FAUCET
(HOSE BIB)
FLOOR WASH
OUTLET
FLOOR WASH
OUTLET
FLOOR WASH
OUTLET
FLOOR WASH
SOLENOID
W
ATER CLO
SET
1.28gal (4.8L) MAX.
PER FLUSH
1.28gal (4.8L) MAX.
PER FLUSH
LAVATORY FAUCET
0.5GPM (MAX.) @ 60 PSI LAVATORY FAUCET
0.5GPM (MAX.) @ 60 PSI
11/8/22
ISOMETRIC VIEW
EXPLODED VIEW
Parts List
QTYDESCRIPTIONPART NUMBERITEM
1VALVE TRAIN USA 1-1/4 VALVE BALL FEM/FEM LONG HANDLE WATER55050081 1VALVE TRAIN USA 1-1/4 BRONZE 150 SWP THREADED Y STRAINER55050152 1WATER METER - FOR REMOTE MONITORING (AS REQUIRED)551600563 1VALVE TRAIN USA 1-1/4 BRASS THREADED SPRING CHECK VALVE55050164 1VALVE TRAIN USA 1-1/4 BRONZE PRESSURE REDUCING VALVE FNPT X FNPT55050135 4VALVE TRAIN USA 1-1/4 X 2 BRASS NIPPLE GLOBAL55050176
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
VALVE TRAIN - USA
15/09/20211-A
15 VALVE TRAIN ASSEMBLY - USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
15/09/2021
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
P
5 4
2 1
WATER IN
3 6
6 6
3 6
5 6
4 6
2 6
1 6
APPROXIMATE LENGTH OF TRAIN = 920mm (36
1 4")
APPROX. 920mm (36 14")
11/8/22
BUTTON, LIGHT AND BRAILLE POSITIONS
BUTTON, LIGHT AND BRAILLE POSITIONS
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
SIGN FRAME MU001 -
ADA
17/03/20201-A
16 SIGN DOOR ASSEMBLY USA - ADA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
1/05/2006
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
G
840 m
m
[33
1 8 in]
1100 m
m
[43
1 4 in]
2058 m
m
[81 in]
FFL
456 mm
[18 in]
860 m
m
[33
7 8 in]
BUTTON HEIGHT AS PER
11B-308.2.1 UNOBSTRUCTED
2019 CALIFORNIA
BUILDING CODE,
MIN 15in/MAX 48in ABOVE FFL
48 in BRAILLE M
IN
1600 m
m
[63 in]
260 m
m
[10
1 4 in]
430 m
m
[16
7 8 in]
655 m
m
[25
3 4 in]
EXAMPLE SIGNS ONLY
60 in BRAILLE M
AX
ACCESSIBLE RESTROOM
BRAILLE WITH TACTILE
CHARACTERS WALL
SIGNS AS PER
2019 CBC, 11B-703.4.
NOTE:
NO BRAILLE ON SIGNS OR BUTTONS
BETWEEN FFL & 48" ABOVE FFL
INDICATOR LIGHTS - NO BRAILLE
BETWEEN FFL & 48" ABOVE FFL
11/8/22
FRONT VIEW SIDE
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
US ADA GENDER
NEUTRAL SIGN
21/09/20181-A
17 ACCESSIBLE RESTROOM DOOR SIGN
JJG
in
N.T.S.
Generic REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
20/09/2018
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
G
6.4 mm
[1 4 in]
6.4 mm
[1 4 in]
n304.8 mm
[n12 in]
60in
FFL
ACCESSIBLE RESTOOM
DOOR SIGN AS PER
CBC, 11B703.7.2.6.
12 THE UNISEX GEOMETRIC SYMBOL WITH THE PICTOGRAM,
RAISED CHARACTERS AND GRADE II BRAILLE IS LOCATED
FOR CLEAR AND SAFE ACCESS AND MOUNTED ADJACENT
TO THE PUBLIC RESTROOM ACCESSWAYS.
11/8/22
MAIN VIEW
SECTION VIEW BP-BP (1 : 20)
SECTION VIEW BR-BR (1 : 20)
SECTION VIEW BT-BT (1 : 20)
BM BM
BN
BN
BU
BU
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
3D-2755
15/07/20211-A
18 JUPITER SUPER TWIN BASE - USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/06/2011
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
32.5 mm
[11 4 in]
31 mm
[11 4 in]
5400 mm
[2125 8 in]
, 18 SPACES @ 30032 mm
[11 4 in]
31 mm
[11 4 in]
30 mm
[11 8 in]
202.5 mm
[8 in]
215 mm
[81 2 in]
900 mm
[353 8 in]
, 6 SPACES @ 150
215 mm
[81 2 in]
2400 mm
[941 2 in]
, 8 SPACES @ 300
215 mm
[81 2 in]
900 mm
[353 8 in]
, 6 SPACES @ 150
215 mm
[81 2 in]
202.5 mm
[8 in]
30 mm
[11 8 in]
130 m
m
[5
1 8 in]
TIE IN REINFORCING
TO CAST IN PLATES
98 mm
[37 8 in]
2101 mm
[823 4 in]
, 7 SPACES @ 300
2275 mm
[895 8 in]
35 m
m
[1
3 8 in]
33 m
m
[1
1 4 in]
TIE IN REINFORCING
TO CAST IN PLATES
100 mm
[37 8 in]
2100 mm
[825 8 in]
, 14 SPACES @ 150
150 mm
[57 8 in]
160 m
m
[6
1 4 in]
280 mm
[11 in] 50 m
m
[2 in]
140 mm
[51 2 in]
280 mm
[11 in]
160 mm
[61 4 in]
130 m
m
[5
1 8 in]
NOTES (IMPERIAL):
1. CONCRETE STRENGTH TO BE 40 MPa
2. CONCRETE COVER TO BE 30mm U.N.O
3. REFER TO NZ 3109:1997 TABLE 5.1
FOR PRECASTE TOLERANCES
4. PRODUCT CODE - WX
5. REINFORCING TO BE GRADE 430
AND HD10
200 m
m
[7
7 8 in]
837.5 m
m
[33 in]
200 m
m
[7
7 8 in]
837.5 m
m
[33 in]
200 m
m
[7
7 8 in]
2275 m
m
[89
5 8 in]
200 m
m
[7
7 8 in]
280 mm
[11 in]
140 mm
[51 2 in]
200 mm
[77 8 in]
1997.1 mm
[785 8 in]
47.9 mm
[17 8 in]
200 mm
[77 8 in]
655 mm
[253 4 in]
200 mm
[77 8 in]
27.9 mm
[11 8 in]
1997.1 mm
[785 8 in]
200 mm
[77 8 in]
200 m
m
[7
7 8 in]
140 m
m
[5
1 2 in]
280 m
m
[11 in]
R60 mm
[R23 8 in]R60 mm
[R23 8 in]
120 mm
[43 4 in]
101.6 mm
[4 in]
101.6 mm
[4 in]
220 m
m
[8
5 8 in]
200 m
m
[7
7 8 in]
837.5 m
m
[33 in]
200 m
m
[7
7 8 in]
837.5 m
m
[33 in]
200 m
m
[7
7 8 in]200 mm
[77 8 in]
1738.5 mm
[681 2 in]
824 mm
[321 2 in]
824 mm
[321 2 in]
1738.5 mm
[681 2 in]
200 mm
[77 8 in]
5525 mm
[2171 2 in]
2537.5 mm
[997 8 in]
335.2 m
m
[13
1 4 in]
450 m
m
[17
3 4 in]
580 mm
[227 8 in]
2095.5 mm
[821 2 in]
TOP
BOTTOM
11/8/22
EXPLODED VIEW TOP REINFORCING
BOTTOM REINFORCING
REINFORCING - HIDDEN VIEW
Parts List
QTYDESCRIPTIONPART NUMBERITEM
2CORNER REAR CASTING PLATEJUP 100251
1JUPITER 32 CONCRETE FLOOR SLABJUP32 80002-USA2
6CORNER FRONT CASTING PLATEJUP 100243
1JUPITER 32 TOP REINFORCINGJUP32
50012-JUP22US
4 1JUPITER 32 BOTTOM REINFORCINGJUP32 50022-jup22us5
2REAR CASTING PLATEJUP 100237
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
3D-2755
15/07/20211-A
19 JUPITER SUPER TWIN BASE - USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/06/2011
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
1 33
77 33
1 33
4 2
5 2275 m
m
[89
5 8 in]
5525 mm
[2171 2 in]
275 m
m
[10
7 8 in]
500 m
m
[19
5 8 in]
630 mm
[243 4 in]
2487.5 mm
[977 8 in]
2101 m
m
[82
3 4 in], 14 SPACES @
150m
m
99 m
m
[3
7 8 in] 201.5 mm
[77 8 in]
215 mm
[81 2 in]
900 mm
[353 8 in]
, 6 SPACES @ 150mm
215 mm
[81 2 in]
2400 mm
[941 2 in]
, 8 SPACES @ 300mm 215 mm
[81 2 in]
900 mm
[353 8 in]
, 6 SPACES @ 150mm
215 mm
[81 2 in]
203.5 mm
[8 in]
5465 mm
[2151 8 in]
630 mm
[243 4 in]
2487 mm
[977 8 in]
2357 mm
[923 4 in]
97.8 m
m
[3
7 8 in]
2101.3 m
m
[82
3 4 in]
, 7 SPACES @
300m
m
31.5 mm
[11 4 in]
5400 mm
[2125 8 in]
32.5 mm
[11 4 in]
147.5 mm
[53 4 in]
122.5 mm
[47 8 in]
5204 mm
[2047 8 in]
499.8 m
m
[19
5 8 in]
274.9 m
m
[10
7 8 in]
11/8/22
FOUNDATION PLAN
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
3D-2712
27/05/20221-P
20 JUPITER SUPER TWIN/TRIPLE BASE FOR
MODELS 22,23,32,33,42,43,52,53
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/06/2011
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
FOOTING POSITION
FOOTING POSITION
NOTE:
SLAB SLOPES FROM 5-1/8" (5-5/8" INC TILES) AT FRONT
TO 6-1/4" (6-3/4" INC TILES) AT REAR.
FOOTING IS NOT PART OF THE BASE
- CONTRACTOR TO SUPPLY.
REFER TO HUME ENGINEERING DRAWINGS,
RS1.1 & RS2, FOR DETAILS OF THE FOUNDATION
1334 mm
[521 2 in]
2095.5 mm
[821 2 in]
2095.5 mm
[821 2 in]
2275 m
m
[89
5 8 in]
900 mm
[353 8 in]
457.2 mm
[18 in]
2810.6 mm
[1105 8 in]
457.2 mm
[18 in]
900 mm
[353 8 in]
1128.6 mm
[443 8 in]
1128.6 mm
[443 8 in]
3267.8 mm
[1285 8 in]
18" W x 30" D GRADE
BEAM W/3-#5
T&B & #3 TIES
@ 12" OC TYP
18" W x 30" D GRADE
BEAM W/3-#5
T&B & #3 TIES
@ 12" OC TYP
11/8/22
FRONT PERSPECTIVE
Parts List
QTYUNIT QTYITEM
QTYPART NUMBERITEM
201 7 16 in100 11 16 in2AS 1163 - C350L0 75x75x5.0 SHS - 25581 423 1 4 in211 5 8 in2AS 1163 - C350L0 75x75x5.0 SHS - 53752 274 5 8 in91 9 16 in3AS 1163 - C350L0 75x75x5.0 SHS - 23253 334 5 8 in83 11 16 in4AS 1163 - C350L0 75x75x5.0 SHS - 21254 180 11 16 in90 3 8 in2AS 1163 - C350L0 75x75x5.0 SHS - 22955 186 5 8 in93 5 16 in2AS 1163 - C350L0 75x75x5.0 SHS - 23706 537 3 8 in89 9 16 in6AS 1163 - C350L0 75x50x3.0 RHS - 22757 30 11 16 in30 11 16 in1AS 1163 - C350L0 75x50x3.0 RHS - 7808 14 11 16 in14 11 16 in1AS 1163 - C350L0 75x50x3.0 RHS - 372.59 87 1 8 in87 1 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 2212.510 61 7 16 in30 11 16 in2AS 1163 - C350L0 50x50x3.0 SHS - 78011 353 9 16 in88 3 8 in4AS 1163 - C350L0 75x50x3.0 RHS - 224512 7 13 16 in3 15 16 in2AS 1163 - C350L0 50x50x3.0 SHS - 99.513 89 3 8 in44 11 16 in2AS 1163 - C350L0 50x50x3.0 SHS - 113514 33 3 8 in33 3 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 84815 18 11 16 in6 1 4 in3AS 1163 - C350L0 75x75x5.0 SHS - 15816 242 1 8 in40 3 8 in6AS 1163 - C350L0 75x50x3.0 RHS - 102517 180 11 16 in90 3 8 in2AS 1163 - C350L0 75x75x3.0 SHS - 229518 103 1 4 in51 5 8 in2AS 1163 - C350L0 50x50x3.0 SHS - 131119 161 7 16 in40 3 8 in4AS 1163 - C350L0 75x25x2.5 RHS - 102520 41 15 16 in21 in2AS 1163 - C350L0 50x50x3.0 SHS - 53321 21 15 16 in11 in2AS 1163 - C350L0 50x50x3.0 SHS - 27922 3 16 in1 16 in45525423523
93 13 16 in93 13 16 in1AS 1163 - C350L0 50x50x3.0 SHS - 2382.524 1 16 in1 16 in25525062225
167 5 16 in83 11 16 in2AS 1163 - C350L0 50x25x3.0 RHS - 212526 167 7 16 in83 11 16 in2AS 1163 - C350L0 100x50x3.0 RHS - 2126.12627 167 5 16 in83 11 16 in2AS 1163 - C350L0 75x50x3.0 RHS - 212528 13 3 8 in13 3 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 340.529 87 7 8 in87 7 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 2232.530 32 5 8 in32 5 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 82831 93 in93 in1AS 1163 - C350L0 50x50x3.0 SHS - 2362.532
12 5 8 in12 5 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 320.533 10 3 4 in10 3 4 in1AS 1163 - C350L0 75x50x3.0 RHS - 272.534 88 3 8 in88 3 8 in1AS 1163 - C350L0 75x75x3.0 SHS - 224535 25 3 8 in12 11 16 in2AS 1163 - C350L0 75x50x3.0 RHS - 322.536 117 13 16 in14 3 4 in8AS 1163 - C350L0 50x50x3.0 SHS - 37437 217 1 16 in217 1 16 in1AS 1163 - C350L0 75x75x5.0 SHS - 551338 218 13 16 in218 13 16 in1AS 1163 - C350L0 75x75x5.0 SHS - 555839 70 3 16 in35 1 16 in2AS 1163 - C350L0 75x50x3.0 RHS - 89140 37 5 8 in18 13 16 in2AS 1163 - C350L0 75x25x2.5 RHS - 47841 3 16 in1 16 in45525433542
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
JUP22DD-US-TF1001
27/05/20221-B
21 JUPITER TWIN ACCESSIBLE USA FRAME -
SINGLE BABY CHANGE
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
11/05/2021
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
S
4 18
3223
23 17
2 37 33
37 2137
12 31
17 27
6 14
4 37
22 5
4 22
37 12
5 11
13 12
10 11
37 27
13 2137
12 37
29 24
14 15
23 6
17 30
1 23 2
3 3
26 26
30 17
4 16
16 8
17 20
41 40
20 19
1 36
7 9
16 39
36 7
34 28
35 38
REV DESCRIPTION DATE
1-B REMOVE ROOF OUTRIGGERS 29/04/2022
42 42
42 42
STEEL FRAME WELD CONNECTION DESIGN NOTE:
ALL HSS 3" x 3" x 3 16" WITH 1 4" WELDS ALL AROUND
11/8/22
REAR PERSPECTIVE
Parts List
QTYUNIT QTYITEM
QTYPART NUMBERITEM
201 7 16 in100 11 16 in2AS 1163 - C350L0 75x75x5.0 SHS - 25581 423 1 4 in211 5 8 in2AS 1163 - C350L0 75x75x5.0 SHS - 53752 274 5 8 in91 9 16 in3AS 1163 - C350L0 75x75x5.0 SHS - 23253 334 5 8 in83 11 16 in4AS 1163 - C350L0 75x75x5.0 SHS - 21254 180 11 16 in90 3 8 in2AS 1163 - C350L0 75x75x5.0 SHS - 22955 186 5 8 in93 5 16 in2AS 1163 - C350L0 75x75x5.0 SHS - 23706 537 3 8 in89 9 16 in6AS 1163 - C350L0 75x50x3.0 RHS - 22757 30 11 16 in30 11 16 in1AS 1163 - C350L0 75x50x3.0 RHS - 7808 14 11 16 in14 11 16 in1AS 1163 - C350L0 75x50x3.0 RHS - 372.59 87 1 8 in87 1 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 2212.510 61 7 16 in30 11 16 in2AS 1163 - C350L0 50x50x3.0 SHS - 78011 353 9 16 in88 3 8 in4AS 1163 - C350L0 75x50x3.0 RHS - 224512 7 13 16 in3 15 16 in2AS 1163 - C350L0 50x50x3.0 SHS - 99.513 89 3 8 in44 11 16 in2AS 1163 - C350L0 50x50x3.0 SHS - 113514 33 3 8 in33 3 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 84815 18 11 16 in6 1 4 in3AS 1163 - C350L0 75x75x5.0 SHS - 15816 242 1 8 in40 3 8 in6AS 1163 - C350L0 75x50x3.0 RHS - 102517 180 11 16 in90 3 8 in2AS 1163 - C350L0 75x75x3.0 SHS - 229518 103 1 4 in51 5 8 in2AS 1163 - C350L0 50x50x3.0 SHS - 131119 161 7 16 in40 3 8 in4AS 1163 - C350L0 75x25x2.5 RHS - 102520 41 15 16 in21 in2AS 1163 - C350L0 50x50x3.0 SHS - 53321 21 15 16 in11 in2AS 1163 - C350L0 50x50x3.0 SHS - 27922 3 16 in1 16 in45525423523
93 13 16 in93 13 16 in1AS 1163 - C350L0 50x50x3.0 SHS - 2382.524 1 16 in1 16 in25525062225
167 5 16 in83 11 16 in2AS 1163 - C350L0 50x25x3.0 RHS - 212526 167 7 16 in83 11 16 in2AS 1163 - C350L0 100x50x3.0 RHS - 2126.12627 167 5 16 in83 11 16 in2AS 1163 - C350L0 75x50x3.0 RHS - 212528 13 3 8 in13 3 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 340.529 87 7 8 in87 7 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 2232.530 32 5 8 in32 5 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 82831 93 in93 in1AS 1163 - C350L0 50x50x3.0 SHS - 2362.532
12 5 8 in12 5 8 in1AS 1163 - C350L0 50x50x3.0 SHS - 320.533 10 3 4 in10 3 4 in1AS 1163 - C350L0 75x50x3.0 RHS - 272.534 88 3 8 in88 3 8 in1AS 1163 - C350L0 75x75x3.0 SHS - 224535 25 3 8 in12 11 16 in2AS 1163 - C350L0 75x50x3.0 RHS - 322.536 117 13 16 in14 3 4 in8AS 1163 - C350L0 50x50x3.0 SHS - 37437 217 1 16 in217 1 16 in1AS 1163 - C350L0 75x75x5.0 SHS - 551338 218 13 16 in218 13 16 in1AS 1163 - C350L0 75x75x5.0 SHS - 555839 70 3 16 in35 1 16 in2AS 1163 - C350L0 75x50x3.0 RHS - 89140 37 5 8 in18 13 16 in2AS 1163 - C350L0 75x25x2.5 RHS - 47841 3 16 in1 16 in45525433542
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
JUP22DD-US-TF1001
27/05/20221-B
22 JUPITER TWIN ACCESSIBLE USA FRAME -
SINGLE BABY CHANGE
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
11/05/2021
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
S
27 16
2 16
8 4
3 3
26 25
4 16
27 32
33 37
37 21
37 37
22 24
23 23
1 36
17 19
20 40
41 20
17 18
17 7
9 6
31 14
12 10
12 13
5 11
30 12
12 6
15 14
13 29
37 24
1 17
21 37
37 37
22 17
5 112
23 23
38 3934
7 36
28 35
42 42
42 42
STEEL FRAME WELD CONNECTION DESIGN NOTE:
ALL HSS 3" x 3" x 3 16" WITH 1 4" WELDS ALL AROUND
11/8/22
3. FRONT ELEVATION (NO ROOF) 1. RIGHT ELEVATION (NO ROOF)
4. PLAN (NO ROOF)
BF ( 1:10 )
BG ( 1 : 10 )
BH ( 1 : 10 )
BF
BG
BH
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
JUP22DD-US-TF1001
27/05/20221-B
23 JUPITER TWIN ACCESSIBLE USA FRAME -
SINGLE BABY CHANGE
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
11/05/2021
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
S
1840 mm
[721 2 in]
5525 mm
[2171 2 in]
30 mm
[11 8 in]
140 m
m
[5
1 2 in]
16 mm
[5 8 in]
2212.5 mm
[871 8 in]
780 mm
[303 4 in]
2232.5 mm
[877 8 in]
1406 m
m
[55
3 8 in]
245 m
m
[9
5 8 in]
374 m
m
[14
3 4 in]
2275 m
m
[89
5 8 in]
290.5 mm
[113 8 in]
540 mm
[211 4 in]
433 mm
[17 in]
540 mm
[211 4 in]
229 mm
[9 in]
229 mm
[9 in] 540 mm
[211 4 in]
433 mm
[17 in]
540 mm
[211 4 in]
270.5 mm
[105 8 in]780 mm
[303 4 in]
374 mm
[143 4 in]
50 mm
[2 in]
25 25
170 m
m
[6
3 4 in]
780 mm
[303 4 in]
2557.3 m
m
[100
5 8 in]
2400 m
m
[94
1 2 in]
322.5 mm
[123 4 in]
1200 m
m
[47
1 4 in]
1025 m
m
[40
3 8 in]
2558 m
m
[100
3 4 in]
2400 m
m
[94
1 2 in]
30 m
m
[1
1 8 in]
1025 mm
[403 8 in]
1025 mm
[403 8 in]
411 mm
[161 8 in]
405 mm
[16 in]
478 m
m
[18
7 8 in] 565 m
m
[22
1 4 in]
964 m
m
[38 in]
38 m
m
[1
1 2 in]
84 mm
[31 4 in]
2275 mm
[895 8 in]
1170 m
m
[46
1 8 in]
1025 m
m
[40
3 8 in]
2370 m
m
[93
1 4 in]
669 mm
[263 8 in]
NOTE: MAX SPAN BETWEEN SUPPORTS IS <1200mm (47in) FOR COMPRESSED SHEET PANELS 25 26
8 3
2 25 mm
[1 in]
170 m
m
[6
3 4 in]
100 mm
[37 8 in]
12 mm
[1 2 in]
PORTAL OFFSET
GUSSET TOP
& BOTTOM
PORTAL OFFSET
25 m
m
[1 in]
75 m
m
[3 in]
100 m
m
[3
7 8 in]
25 mm
[1 in]
26 2/S4
4/S4
3/-
1/-
1406 m
m
[55
3 8 in]
1910 mm
[751 4 in]
272.5 mm
[103 4 in]
1200 m
m
[47
1 4 in]
1025 m
m
[40
3 8 in]
FRONT
REAR
REAR
FRONT
STEEL FRAME WELD CONNECTION DESIGN NOTE:
ALL HSS 3" x 3" x 3 16" WITH 1 4" WELDS ALL AROUND
11/8/22
5. REAR ELEVATION (NO ROOF)
2. LEFT ELEVATION (NO ROOF)
6. FRONT LIFTING PLATE
DETAIL VIEW BJ
7. FRONT LIFTING PLATE
DETAIL VIEW BK
BJ BK
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
JUP22DD-US-TF1001
27/05/20221-B
24 JUPITER TWIN ACCESSIBLE USA FRAME -
SINGLE BABY CHANGE
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
11/05/2021
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
S
99.5 mm
[37 8 in]
1135 mm
[445 8 in]
1135 mm
[445 8 in]
848 mm
[333 8 in]
828 mm
[325 8 in]
5525 mm
[2171 2 in]
2212.5 mm
[871 8 in]
2232.5 mm
[877 8 in]
99.5 mm
[37 8 in]
1170 m
m
[46
1 8 in]
780 mm
[303 4 in]
1025 m
m
[40
3 8 in]
2370 m
m
[93
1 4 in]
1135 mm
[445 8 in]
1025 m
m
[40
3 8 in]
2370 m
m
[93
1 4 in]
2558 m
m
[100
3 4 in]
2400 m
m
[94
1 2 in]
2275 mm
[895 8 in]
964 m
m
[38 in]
75 m
m
[3 in]
165 m
m
[6
1 2 in]
140 mm
[51 2 in]
140 mm
[51 2 in]
165 m
m
[6
1 2 in]
75 m
m
[3 in]
NOTE: MAX SPAN BETWEEN SUPPORTS IS <1200mm (47in) FOR COMPRESSED SHEET PANELS 1025 mm
[403 8 in]
1025 mm
[403 8 in]
1170 m
m
[46
1 8 in]
1231 m
m
[48
1 2 in]
30 m
m
[1
1 8 in]
REAR
FRONT
REAR
FRONT
STEEL FRAME WELD CONNECTION DESIGN NOTE:
ALL HSS 3" x 3" x 3 16" WITH 1 4" WELDS ALL AROUND
11/8/22
FRONT ELEVATION
RIGHT ELEVATION
PLAN VIEW
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
JUP22DD-US-TF1001
27/05/20221-B
25 JUPITER TWIN ACCESSIBLE USA FRAME -
SINGLE BABY CHANGE
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
11/05/2021
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
S
1287.5 mm
[503 4 in]
1287.5 mm
[503 4 in]
1287.5 mm
[503 4 in]
1287.5 mm
[503 4 in]
1056.3 mm
[415 8 in]
1076.3 mm
[423 8 in]
780 mm
[303 4 in]
1056.3 mm
[415 8 in]
1056.3 mm
[415 8 in]
4°
2558 m
m
[100
3 4 in]
2370 m
m
[93
1 4 in]
2275 mm
[895 8 in]
NOTE: MAX SPAN BETWEEN SUPPORTS IS <1200mm (47in) FOR COMPRESSED SHEET PANELS 669 m
m
[26
3 8 in]
669 mm
[263 8 in]
5513 mm
[217 in]
22.5 mm
[7 8 in] 22.5 mm
[7 8 in]
6 mm
[1 4 in]
6 mm
[1 4 in]
REAR
FRONT
FRONT
REAR
STEEL FRAME WELD CONNECTION DESIGN NOTE:
ALL HSS 3" x 3" x 3 16" WITH 1 4" WELDS ALL AROUND
11/8/22
FRONT ELEVATION FRONT - ACCESSIBLE SWING DOOR
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
JUP22DD-US-TF1001
27/05/20221-B
26 JUPITER TWIN ACCESSIBLE USA FRAME -
SINGLE BABY CHANGE
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
11/05/2021
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
S
1287.5 mm
[503 4 in]
1287.5 mm
[503 4 in]
1287.5 mm
[503 4 in]
1287.5 mm
[503 4 in]
1045 mm
[411 8 in]
322.5 mm
[123 4 in]
745 mm
[293 8 in]
780 mm
[303 4 in]
745 mm
[293 8 in]
5525 mm
[2171 2 in]
1045 mm
[411 8 in]
342.5 mm
[131 2 in]
SWING DOOR FOR MANUAL
OPTION (REFER SHEET G/EXELOO
QUALITY ASSURANCE MANUAL)
953 mm
[371 2 in]
CLEAR OPENING
2064 m
m
[81
1 4 in]
1035 mm
[403 4 in]
STEEL FRAME WELD CONNECTION DESIGN NOTE:
ALL HSS 3" x 3" x 3 16" WITH 1 4" WELDS ALL AROUND
11/8/22
DETAIL CJ - TYPICAL
"T" CONNECTION & VERTICAL WELDS
( 1 : 10 )
DETAIL CL
POST TO BEAM CONNECTION ( 1 : 10 )
DETAIL CM
TYPICAL BASE PLATE CONNECTION
CENTRE PORTAL POST
( 1 : 10 )
DETAIL CP
TYPICAL BASE PLATE CONNECTION
CORNER PORTAL POSTS
( 1 : 10 )
DETAIL CT
LIFT PLATE TO
PORTAL/ROOF BEAM
1 : 10 )
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
27 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
S
POST PER PLAN
1/4"
1/4"
BEAM
POST PER PLAN
BEAM PER PLAN
1/4"
1/4"
CONCRETE SLAB PER PLAN
1/4"
HSS POST PER PLAN
PL
1 2"x10x10
1/4"
4-
3 8"Ø WELDED
STUDS x 3" LONG
CONCRETE SLAB PER PLAN
HSS 3x2x
1 8 FLAT
HSS POST PER PLAN
REFER TO HUME ENGINEERING DRAWINGS,
RS4, FOUNDATION, DATE 2020-09-21
FOR FOUNDATION DETAILS
NOTE (FOR DETAIL C - FOOTING @ SLAB):
1. THE SUBGRADE (BELOW THE AGGREGATE BASE) SHOULD BE SCARIFIED TO A DEPTH OF ABOUT 12 INCHES, MOISTURE CONDITIONED, TO AT LEAST 3 PERCENT ABOVE OPTIMUM MOISTURE CONTENT, AND RE-COMPACTED TO AT LEAST 90 PERCENT RELATIVE COMPACTION PER ASTM D-1557.
2. THE BOTTOM OF THE FOOTING EXCAVATION SHOULD BE COMPACTED WITH A JUMPING JACK COMPACTOR WITH AT LEAST 4 PASSES.
3. THE SLAB SHOULD BE UNDERLAIN BY 2 INCHES A MASON SAND (ASTM C-144) COMPACTED WITH A VIBRATORY PLATE OVER A MINIMUM 4 INCHES OF CLASS 2 AGGREGATE BASE COMPACTED TO AT LEAST 95 PERCENT RELATIVE COMPACTION.
PL
1 2"x10x10
1/4"
1/4"
76.1 mm
[3 in]
50 m
m
[2 in]
TIE IN REINFORCING
TO CAST IN PLATES
TIE IN REINFORCING
TO CAST IN PLATES
1/4"
1/4"
PORTAL BEAM
ROOF BEAM
75 m
m
[3 in]
76.1 mm
[3 in]
3 4" LIFT PLATE
3 4" LIFT PLATE
28.2 mm
[11 8 in] 30 mm
[11 8 in]
141.3 m
m
[5
5 8 in]
STEEL FRAME WELD CONNECTION DESIGN NOTE:
ALL HSS 3" x 3" x 3 16" WITH 1 4" WELDS ALL AROUND
11/8/22
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
28 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
11/8/22
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
29 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
11/8/22
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
30 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
11/8/22
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
31 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
11/8/22
DOOR ENTRY & CONCRETE APRON
( 1 : 3 )
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
A A
B B
C C
D D
E E
F F
G G
H H
I I
J J
Drawn by:
Approved by:
Creation Date:
Rev.
Finish:
Description:
Drawing No:Material:
SPECIFICATION SUBJECT TO CHANGE WITHOUT NOTICE
Proj:
Checked by:
Units:
Sheet No.
Scale:Tolerance:
DO NOT SCALE - IF IN DOUBT ASK
ASJUP22DD-US1BON
24/08/20221-H
32 JUPITER TWIN ACCESSIBLE USA
JJG
in
N.T.S.
REF
26 Paramount Dve Henderson 0610
PO Box 33-256 Takapuna, Auckland
T: +64-9-838-8912 F: +64-9-838-8913
+/-0.5
R
Rev Date.
16/04/2012
New Zealand Australia
Unit 18, 62-66 Newton Rd Wetherill Park
PO Box 12 Liverpool NSW 1871
T: +61-2-975-3444 F: +61-2-1-800-105-504
954 Toro St San Luis Obispo CA 93401
PO Box 13310 San Luis Obispo CA 93406
T: (800) 676-5290 or 1-800-303-3506
USA
B
CONCRETE APRON
(BY OTHERS)
FLOOR DRAIN GRATE
DOOR THRESHOLD
FLOOR TILE
POCKET SLIDING DOOR
CONCRETE SLAB BASE130 mm
[51 8 in]
FRONT OF SLAB
12 m
m
[12 in] FLOOR TILE
11.8 mm
[1 2 in]
THRESHOLD
5 m
m
[14 in]
11/8/22
.
“” “”
··············
NO. DATE : ISSUED FOR :
S H E E T N A M E :P R O J E C T: S H E E T N O.D R A W N B Y :RS0.120 020DETAILS 2022-05-09STAMPED SET #01
ALL DESIGN, IDEAS, SPECIFICATIONS AND OTHER INFORMATION ON THEDRAWINGS ARE FOR USE ON THE SPECIFIED PROJECT AND ARE NOT TOBE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNERWITHOUT THE WRITTEN CONSENT OF THOM HUME CONSULTINGENGINEERS. THEIR USE SHALL BE RESTRICTED TO THE ORIGINAL SITEFOR WHICH THEY WERE PREPARED.
P.O. Box 15238San Luis Obispo, Ca. 93406e-mail: [email protected]: (805) 543-6311Fax: (805) 781-9476SB Phone: 962-6311 P.O. Box 15238San Luis Obispo CA 93406805-543-6311SDSStructural Drafting Services JUPITER DOUBLE UNITJUP22DD, JUP32DD,, JUP42DD,JUP52DD
2022-06-07STAMPED SET #02
O:\Jobs Active\20 020 Exeloo HCD_Exeloo\20 020 Jupiter Twin HCD Package\20 020 Dwg's Version 11.0\xref\20 020 D- DETAILS.dwg, 6/7/2022 8:24:15 AM, alma Digitally signed by Thom
DN: C=US,
[email protected],
O=THE inc, OU=THE,
CN=Thom
Location: SLO
Reason: I am approving
this document
Contact Info: Thom
Date: 2022.06.07
16:36:12-07'00'
NO. DATE : ISSUED FOR :
S H E E T N A M E :P R O J E C T: S H E E T N O.D R A W N B Y :RS1.120 020DETAILS 2022-05-09STAMPED SET #01
ALL DESIGN, IDEAS, SPECIFICATIONS AND OTHER INFORMATION ON THEDRAWINGS ARE FOR USE ON THE SPECIFIED PROJECT AND ARE NOT TOBE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNERWITHOUT THE WRITTEN CONSENT OF THOM HUME CONSULTINGENGINEERS. THEIR USE SHALL BE RESTRICTED TO THE ORIGINAL SITEFOR WHICH THEY WERE PREPARED.
P.O. Box 15238San Luis Obispo, Ca. 93406e-mail: [email protected]: (805) 543-6311Fax: (805) 781-9476SB Phone: 962-6311 P.O. Box 15238San Luis Obispo CA 93406805-543-6311SDSStructural Drafting Services JUPITER DOUBLE UNITJUP22DD, JUP32DD,, JUP42DD,JUP52DD
2022-06-07STAMPED SET #02
O:\Jobs Active\20 020 Exeloo HCD_Exeloo\20 020 Jupiter Twin HCD Package\20 020 Dwg's Version 11.0\xref\20 020 D- DETAILS.dwg, 6/7/2022 8:24:18 AM, alma
NO. DATE : ISSUED FOR :
S H E E T N A M E :P R O J E C T: S H E E T N O.D R A W N B Y :RS220 020FOUNDATION & ROOF PLAN 2022-05-09STAMPED SET #01
ALL DESIGN, IDEAS, SPECIFICATIONS AND OTHER INFORMATION ON THEDRAWINGS ARE FOR USE ON THE SPECIFIED PROJECT AND ARE NOT TOBE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNERWITHOUT THE WRITTEN CONSENT OF THOM HUME CONSULTINGENGINEERS. THEIR USE SHALL BE RESTRICTED TO THE ORIGINAL SITEFOR WHICH THEY WERE PREPARED.
P.O. Box 15238San Luis Obispo, Ca. 93406e-mail: [email protected]: (805) 543-6311Fax: (805) 781-9476SB Phone: 962-6311 P.O. Box 15238San Luis Obispo CA 93406805-543-6311SDSStructural Drafting Services JUPITER DOUBLE UNITJUP22DD, JUP32DD,, JUP42DD,JUP52DD
2022-06-07STAMPED SET #02
O:\Jobs Active\20 020 Exeloo HCD_Exeloo\20 020 Jupiter Twin HCD Package\20 020 Dwg's Version 11.0\20 020 S2 FOUNDATION & ROOF PLAN.dwg, 6/7/2022 8:24:39 AM, alma
NO. DATE : ISSUED FOR :
S H E E T N A M E :P R O J E C T: S H E E T N O.D R A W N B Y :RS320 020ELEVATION PLAN 2022-05-09STAMPED SET #01
ALL DESIGN, IDEAS, SPECIFICATIONS AND OTHER INFORMATION ON THEDRAWINGS ARE FOR USE ON THE SPECIFIED PROJECT AND ARE NOT TOBE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNERWITHOUT THE WRITTEN CONSENT OF THOM HUME CONSULTINGENGINEERS. THEIR USE SHALL BE RESTRICTED TO THE ORIGINAL SITEFOR WHICH THEY WERE PREPARED.
P.O. Box 15238San Luis Obispo, Ca. 93406e-mail: [email protected]: (805) 543-6311Fax: (805) 781-9476SB Phone: 962-6311 P.O. Box 15238San Luis Obispo CA 93406805-543-6311SDSStructural Drafting Services JUPITER DOUBLE UNITJUP22DD, JUP32DD,, JUP42DD,JUP52DD
2022-06-07STAMPED SET #02
O:\Jobs Active\20 020 Exeloo HCD_Exeloo\20 020 Jupiter Twin HCD Package\20 020 Dwg's Version 11.0\20 020 S3 ELEVATION PLAN.dwg, 6/7/2022 8:24:44 AM, alma
NO. DATE : ISSUED FOR :
S H E E T N A M E :P R O J E C T: S H E E T N O.D R A W N B Y :RSD1.120 020DETAILS 2022-05-09STAMPED SET #01
ALL DESIGN, IDEAS, SPECIFICATIONS AND OTHER INFORMATION ON THEDRAWINGS ARE FOR USE ON THE SPECIFIED PROJECT AND ARE NOT TOBE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNERWITHOUT THE WRITTEN CONSENT OF THOM HUME CONSULTINGENGINEERS. THEIR USE SHALL BE RESTRICTED TO THE ORIGINAL SITEFOR WHICH THEY WERE PREPARED.
P.O. Box 15238San Luis Obispo, Ca. 93406e-mail: [email protected]: (805) 543-6311Fax: (805) 781-9476SB Phone: 962-6311 P.O. Box 15238San Luis Obispo CA 93406805-543-6311SDSStructural Drafting Services JUPITER DOUBLE UNITJUP22DD, JUP32DD,, JUP42DD,JUP52DD
2022-06-07STAMPED SET #02
O:\Jobs Active\20 020 Exeloo HCD_Exeloo\20 020 Jupiter Twin HCD Package\20 020 Dwg's Version 11.0\xref\20 020 D- DETAILS.dwg, 6/7/2022 8:25:18 AM, alma
NO. DATE : ISSUED FOR :
S H E E T N A M E :P R O J E C T: S H E E T N O.D R A W N B Y :RSD1.220 020DETAILS 2022-05-09STAMPED SET #01
ALL DESIGN, IDEAS, SPECIFICATIONS AND OTHER INFORMATION ON THEDRAWINGS ARE FOR USE ON THE SPECIFIED PROJECT AND ARE NOT TOBE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNERWITHOUT THE WRITTEN CONSENT OF THOM HUME CONSULTINGENGINEERS. THEIR USE SHALL BE RESTRICTED TO THE ORIGINAL SITEFOR WHICH THEY WERE PREPARED.
P.O. Box 15238San Luis Obispo, Ca. 93406e-mail: [email protected]: (805) 543-6311Fax: (805) 781-9476SB Phone: 962-6311 P.O. Box 15238San Luis Obispo CA 93406805-543-6311SDSStructural Drafting Services JUPITER DOUBLE UNITJUP22DD, JUP32DD,, JUP42DD,JUP52DD
2022-06-07STAMPED SET #02
O:\Jobs Active\20 020 Exeloo HCD_Exeloo\20 020 Jupiter Twin HCD Package\20 020 Dwg's Version 11.0\xref\20 020 D- DETAILS.dwg, 6/7/2022 8:25:21 AM, alma
NO. DATE : ISSUED FOR :
S H E E T N A M E :P R O J E C T: S H E E T N O.D R A W N B Y :RSD1.320 020DETAILS 2022-05-09STAMPED SET #01
ALL DESIGN, IDEAS, SPECIFICATIONS AND OTHER INFORMATION ON THEDRAWINGS ARE FOR USE ON THE SPECIFIED PROJECT AND ARE NOT TOBE REPRODUCED, CHANGED OR COPIED IN ANY FORM OR MANNERWITHOUT THE WRITTEN CONSENT OF THOM HUME CONSULTINGENGINEERS. THEIR USE SHALL BE RESTRICTED TO THE ORIGINAL SITEFOR WHICH THEY WERE PREPARED.
P.O. Box 15238San Luis Obispo, Ca. 93406e-mail: [email protected]: (805) 543-6311Fax: (805) 781-9476SB Phone: 962-6311 P.O. Box 15238San Luis Obispo CA 93406805-543-6311SDSStructural Drafting Services JUPITER DOUBLE UNITJUP22DD, JUP32DD,, JUP42DD,JUP52DD
2022-06-07STAMPED SET #02
O:\Jobs Active\20 020 Exeloo HCD_Exeloo\20 020 Jupiter Twin HCD Package\20 020 Dwg's Version 11.0\xref\20 020 D- DETAILS.dwg, 6/7/2022 8:25:23 AM, alma
Attachment C
1 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
CONSTRUCTION AGREEMENT
BY AND BETWEEN
THE CITY OF VICTORVILLE
AND
LM RASMUSSEN CONSTRUCTION, INC.
FOR
EXELOO PREFABRICATED RESTROOM INSTALLATION,
PROJECT CC23-079
THIS CONSTRUCTION AGREEMENT (the “Agreement”) dated this __________________ day of ______________, 20___, for reference purpose only, is made and entered into by and between the City of Victorville, a municipal corporation located in the County of San Bernardino, State of California, hereinafter referred to as t he “City”, and LM Rasmussen Construction, Inc., a California corporation, hereinafter referred to as the “Contractor”. The City and the Contractor are sometimes hereinafter referred to as a “Party” and collectively referred to as the “Parties.”
RECITALS:
WHEREAS, the City requires Exeloo Prefabricated Restroom Installation, Project CC23-079 (the Project); and
WHEREAS, in light of the facts set forth above, the City desires to retain Contractor in connection with Exeloo Prefabricated Restroom Installation; and
NOW, THEREFORE, IN CONSIDERATION OF THE COVENANTS, CONDITIONS, AND
PROMISES CONTAINED HEREIN AND FOR SUCH OTHER GOOD AND VALUABLE CONSIDERATION, THE PARTIES HERETO AGREE AS FOLLOWS:
Section 1. RECITALS
The Recitals set forth above are true and correct and are hereby incorporated into this Agreement by this reference, as though set forth herein.
Section 2. TERM OF AGREEMENT
This Agreement shall commence within Fifteen (15) Calendar Days after issuance of Notice to Proceed (the “Commencement Date”) and shall terminate upon completion of the Project One Hundred Twenty (120) Calendar Days after Commencement Date (the “Termination Date”), unless sooner terminated in accordance with the provisions of this Agreement (the “Term”).
From and after the Termination Date, and upon subsequent agreement by the Parties, this Agreement may continue on a month- to-month basis until terminated pursuant to Section 3 below.
Section 3. TERMINATION OR SUSPENSION
a. This Agreement may be terminated or suspended without cause by either Party at any time, provided that the Party initiating the termination provides the other Party at least thirty (30) days advance written notice of s uch termination or suspe nsion. In the event of such 2 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory work rendered or supplies actually furnished prior to the effective date of termination.
b. This Agreement may be terminated or suspended with cause by either Party at any time, provided that the Party initiating termination provides the other Party at least ten (10) days advance written notice of such termination or suspension. In the event of such termination, the City shall only be liable for payment under the payment provisions of this Agreement for satisfactory work rendered or supplies actually furnished prior to the effective date of termination.
Section 4. CONTRACT DOCUMENTS; PRIORITY
a. Contract Documents. The Contract Documents consist of the following documents, all of which are either attached hereto as exhibits or are incorporated herein by this reference .
Said Contact Documents are intended to be correlative and constitute Contractor’s performance obligations:
1. This Agreement.
2. Exhibits A & B.
3. Notice Inviting Bids for the Project.
4. Specifications for the Project.
5. Special Provisions.
6. Non-Collusion Declaration.
7. Guaranty.
b. Interpretation. In the event of any conflict between any of the Contract Documents, the document highest in the order of precedence (from highest to lowest), as set forth in Subsection 4.a above shall control.
Section 5. CONTRACTOR’S OBLIGATIONS
Contractor shall complete the Project as specifically set forth in the Contract Documents.
Contractor shall furnish, at its own cost and expense, all labor, services, material, tools, equipment, supplies, transportation, and any other items and facilities necessary therefore, as provided in the Contract Documents.
Section 6. C OMPENSATION
The Contractor agrees to receive and accept the following amount, not to exceed One Hundred Eighty- four Thousand Eight Hundred Forty -three and 00/100 Dollars ($184,843.00), as full compensation for furnishing; all materials, doing all the work contemplated and embraced in this contract, all loss or damage arising out of the nature of the work aforesaid, the action of the elements, any unforeseen difficulties or obstructions w hich may arise or be encountered in the execution of the work until its acceptance by the City, and for all risks of every description connected with the work, all expenses incurred by or in consequence of the suspension or discontinuance of work well and faithfully completing the whole work, thereof, according to the requirements of the agreement documents and to the satisfaction of Eddie Gleason, Facilities Manager, or his designee, to wit: See Exhibit “A”, Scope of Work.
3 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
Section 7. BID PROPOSAL FORMS
The City shall pay Contractor as provided in the Bid Proposal Forms, attached hereto as Exhibit “B”, and incorporated herein by this reference as though set forth in full, subject to approval of the City, when applicable.
Section 8. PREVAILING WAGES
a. Compliance with State and Federal Wage Requirements. As a federally funded Project, the work called for in this Contract must be carried out in compliance with both Federal and State prevailing wage rates, together with all other applicable State and Federal labor laws and requirements specified in the Contract Documents. It is further expressly agreed by and between the Parties hereto that should there be any conflict between the terms of this Contract and the Bid Proposal and Price Schedules submitted by Contractor, then this Contract shall control, and nothing herein shall be considered as an acceptance of the terms of said Bid Proposal conflicting with the requirements of this Section.
b. State Wages - In accordance with the provisions of California Labor Code Sections (1720,1770- 1776, 1810, 1813 and 1815, as amended and applicable), the Sta te Director of Industrial Relations has determined the general prevailing rates of per diem wages in the locality where the Project is to be done. Copies of the updated Wage Determination rates are available from the CITY and the State of California via the internet at www.dir.ca.gov.
Additionally, copies of the prevailing rate of per diem wages and federal wage decision rates are on file at the City of Victorville Finance Department and shall be made available for review to any interested party on reques t. Notwithstanding anything in the Contract Documents to the contrary, Contractor and all subcontractors shall pay not less than said specified State of California rates to all workers employed by them in the execution of the work contemplated by this Contract. Contractor shall be responsible for using the correct and current prevailing wage rates.
c. AB219 (as applicable) adds Section 1720.9 to the Labor Code, the hauling and delivery of ready-mixed concrete to carry out a public works contract, with respect to contracts involving state agency or any political subdivision of the state. Section 1720.9 defines the term “ready-mixed” concrete and specifies that the rate of pay shall be the current prevailing wage “for the geographical area in which the factory or batching plant is located” as determined by the DIR. The statute also requires a written agreement between the party hauling or delivering the ready-mixed concrete and the party that engaged its services. Nothing in Section 1720.9 shall cause any company to be treated as a contractor or subcontractor for any purpose other than the application of this chapter of the Labor Code.
d. The delivery company shall provide certified payroll records under Labor Code section 1776(a) to the party that engaged its services and to the general contractor within five working days after the employee has been paid, accompanied by a written time record within five working days after the employee has been paid, accompanied by a written time record. The time record must be certified by each driver for the performance of job duties.
e. Federal Wages – In accordance with the provisions of the Davis -Bacon Act, and related Federal labor requirements in the Contract Documents with which Contractor has agreed to comply, the Secretary of Labor has determined the general prevailing wage rates, applicable to federally funded construction projects. A copy of the current General Federal Wage Decision applicable to the work to be performed on this Project is attached to this 4 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
Contract as Exhibit “C”. Contractor and all subcontractors shall pay not less than said specified Federal rates to all workers employed by them in the execution of the work under this Contract.
Contractor shall be responsible for using the correct and current Federal prevailing wage rates.
f. Payment of State Wages Required when Higher. Notwithstanding the provisions of Subsection c above, payment of State Prevailing Wage Rates when higher than Federal Wage Rates, are required whenever federally funded or assisted projects are controlled or carried out by California awarding bodies of any sort. The City is considered a California awarding body. Therefore, the higher of State Prevailing Wage and Federal Wage Rates shall apply to this Project and shall be paid by Contractor and all subcontractors.
g. Contractor shall be solely responsible for using the correct wage decision or determination and performing accordingly. An error on the part of any awarding body does not relieve the Contractor from the responsibility for payment of the correct State prevailing wage and compliance with the maintenance and inspection of payroll records, posting of prevailing wage rates at work site, employment of apprentices, and other requirements of California Labor Code Section 1720, et seq.; California Code of Regulations, Title 8, Section 16000 et seq.; and all other applicable State labor laws. Contractor further acknowledges and agrees that it will be independently responsible for reviewing the applicable laws and regulations and effectuating compliance with those laws. Contractor will require the same of all its subcontractors.
h. Contractor shall provide completed WEEKLY CERTIFIED PAYROLL and DAILY SIGN IN SHEETS with each invoice presented to the CITY, substantially in the form and containing the information set forth on the sample Weekly Certified Payroll and Daily S ign In Sheets provided in the Contract Documents. Payment of said invoices WILL be delayed absent these documents.
i. Contractor shall provide completed EMPLOYEE INFORMATION SHEETS, substantially in the f orm and containing the information set forth on the sample Employee Information Sheets provided in the Contract Documents, for each employee listed on the Weekly Certified Payroll or Daily Sign -In Sheets prior to, or along with the first invoice. This document is required only once per employee. Payment of said invoices WILL be delayed absent these documents.
j. The statutory penalties for failure to pay prevailing wage or to comply with State wage and hour laws will be enforced. Contractor must forfeit to CITY TWENTY -FIVE DOLLARS ($25.00) per day for each worker who works in excess of the minimum working hours when Contractor does not pay overtime. In accordance with the provisions of Labor Code Sections 1810 et seq., eight (8) hours is the legal working day.
Section 9. W ORKERS’ COMPENSATION INSURANCE
Contractor shall procure and maintain, at its own expense, during the Term of this Agreement, workers’ compensation insurance, providing coverage as required by the California State Workers’ Compensation Law. If any class of employees employed by Contractor is not protected by the California State Workers’ Compensation Law, Contractor shall provide adequate insurance for the protection of such employees to the satisfaction of the City.
In conformance with current statutory requirements of Section 1860 et seq., of the Labor Code of the State of California, the undersigned confirms the following as their certification:
5 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions before commencing the performance of the work of this contract.
Section 10. NOTICE TO PROCEED
No work, service, material, or equipment shall be performed or furnished under this Contract unless and until a Notice to Proceed has been given to the Contractor by the City.
Contractor shall commence work pursuant to the Contract Documents as directed by the City in the Notice to Proceed, and to diligently execute the same to completion within the time limits set forth in the Contract Documents.
Section 11. COMPLIANCE WITH LAWS
Contractor shall comply with all local, state, and federal laws and regulations applicable to the performance of the work required by the Contract Documents, including any rule, regulation, or bylaw governing the conduct or performance of Contractor, its employees, officers, board members, agents, independent contractors, and subcontractors. Unless otherwise specified in the Contract Documents, all required permits and licenses shall be held or obtained by the Contractor at its sole expense.
Section 12. COMMERCIAL GENERAL AND AUTOMOBILE LIABILITY
INSURANCE
Contractor shall procure and maintain at its own expense, during the term of this Agreement, com mercial general liability insurance, of not less than One Million Dollars ($1,000,000) per occurrence, and Two Million Dollars ($2,000,000) in the aggregate, for bodily injury, personal injury, death, loss, or damage resulting from the wrongful or negligent acts by the Contractor or its officers, employees, servants, volunteers, and agents and independent contractors.
Contractor shall further procure and maintain, at its own expense, during the Term of this Agreement, commercial vehicle liability insurance covering personal injury and property damage, of not less than One Million Dollars ($1,000,000) Combined Single Limit, covering any vehicle(s) utilized by Contractor or its officers, employees, servants, volunteers, or agents and independent contractors in performing the services required by this Agreement.
Section 13. COURSE OF CONSTRUCTION/INLAND MARINE INSURANCE
Contractor, and or any of its subcontractors, suppliers, vendors, employees, or person whom it performing any work under this agreement shall purchase, and maintain insurance to the full contract and insurable value thereof commonly referred to as a Course of Construction, Builders’ Risk, or an Inland Marine policy that offers “Installation” coverage for all materials, supplies, equipment, and property obtained by, or for Contractor, which is to become part of the work while such equipment and property is stored at the jobsite, at temporary locations, or while in transit to the project from such temporary locations. Contractor, and or any of its subcontractors, suppliers, vendors, employees, or person whom is performing any work under this agreement shall also be responsible for insuring their owned, leased/rented or borrowed equipment. Insurance should also include a Loss Payee, and a Waiver of Subrogation Endorsement(s) in favor of the City of Victorville.
6 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
Section 14. ADDITIONAL INSURED
Notwithstanding any inconsistent statement in any required insurance policies or any subsequent endorsements attached thereto, the protection offered by all policies, except for Workers' Compensation coverage, shall bear an endorsement whereby it is provided that, the City and its officers, employees, servants, volunteers, and agents and independent contractors, including, without limitation, the City Attorney, are named as Additional Insureds.
Section 15. WAIVER OF SUBROGATION RIGHTS
Contractor shall r equire the carriers of all required insurance policies to waive all rights of subrogation against the City and its officers, volunteers, employees, contractors, and subcontractors. Each policy of insurance shall be endorsed to reflect such waiver.
Section 16. PROOF OF INSURANCE COVERAGE; REQUIRED PRIOR TO
COMMENCEMENT OF SERVICES
a. Contractor shall secure from a good and responsible company or companies authorized to do insurance business in the State of California the policies of insurance required by this Agreement and furnish to the City Clerk certificates of said insurance at least one (1) day prior to the commencement of any services to be performed under this Agreement.
b. The certificates of insurance shall bear an endorsement whereby it is provided that, in the event of cancellation or amendment of any required insurance policy for any reason whatsoever, the City shall be notified by mail, postage prepaid, not less than thirty (30) days before the cancellation or amendment is effective. In the case of non -payment, ten (10) days’ advance written notice shall be given.
c. The certificates of insurance shall bear an endorsement whereby it is provided that the respective insurance policy shall not be terminated or expire without first providing thirty (30) days written notice to the City of such termination or expiration.
d. The certificates of insurance shall indicate that the respective insurance policy will be maintained throughout the Term of this Agreement.
e. The Commercial General Liability and vehicle liability policies shall be endorsed to contain the following provision: “For any claims related to this Contract, Contractor’s service coverage shall be pri mary with respect to the City. Any insurance maintained by the City shall be in excess of Contractor’s insurance and shall not contribute to it.
Section 17. TIME OF THE ESSENCE
Time is of the essence in the performance of this Agreement.
Section 18. INDEMNIFICATION
Notwithstanding the limits of any insurance, Contractor shall indemnify the City, its officials, officers, agents, volunteers and employees against, and will hold and save them and each of them harmless from, any and all actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities, (herein "claims or liabilities") that may be asserted or claimed by any person, firm or entity arising or alleged to arise out of or 7 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
in connection with the negligent performance of the work, operations or activities of Contractor, its agents, employees, subcontractors, or invitees, provided for herein, or arising or alleged to arise from the negligent acts or omissions of Contractor hereunder, or arising or alleged to arise from Contractor's negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, but excluding such claims or liabilities or portion of such claims or liabilities arising or alleged to arise from the negligence or willful misconduct of the City its officials, officers, agents, volunteers or employees, and in connection therewith:
a. Contractor will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys' fees incurred in connection therewith;
b. Contractor will promptly pay any judgment rendered against the City, its officials, officers, agents or employees for any such claims or liabilities arising or alleged to arise out of or in connection with Contractor's (or its agents', employees', subcontractors' or invitees') negligent performance of or failure to perform such work, operations or activities hereunder; and Contractor agrees to save and hold the City, its officials, volunteers, officers, agents, and employees harmless there from;
c. In the event the City, its officials, officers, agents, volunteers or employees is made a Party to any action or proceeding filed or prosecuted against Contractor for such damages or other claims arising or alleged to arise out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Contractor hereunder, Contractor shall pay to the City, its officials, volunteers officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys' fees for counsel acceptable to City;
d. Contractor's duty to defend and indemnify as set out in this Section shall include any claims, liabilities, obligations, losses, demands, actions, penalties, suits, costs, expenses or damages or injury to persons or property arising or alleged to arise from, in connection with, as a consequence of or pursuant to any state or federal law or regulation regarding hazardous substances, including but not limited to the Federal Insecticide, Fungicide and Rodenticide Act ("FIFRA"), Comprehensive Environmental Response, Compensation and Liability Act of 1980 ("CERCLA"), Resource Conservation and Recovery Act of 1976 ("RCRA"), the Hazardous and Solid Waste Amendments of 1984, the Hazardous Material Transportation Act, the Toxic Substances control Act, the Clean Air Act, the Clean Water Act, the California Hazardous Substance Account Act, the California Hazardous Waste Control Law or the Porter -Cologne Water Quality Control Act, as any of those statutes may be amended from time to time;
The Contractor's indemnification obligations pursuant to this Section shall survive the termination of this Agreement. Contractor shall require the same indemnification from all subcontractors.
Section 19. REPORTS
Upon request by Eddie Gleason, Facilities Manager , or his designee, Contractor shall prepare and submit reports concerning Contractor's performance of the work required by this Agreement.
8 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
Section 20. RECORDS
a. Contractor shall keep such books and records as shall be necessary to perform the services required by this Agreement and enable Eddie Gleason, Facilities Manager, or his designee, to evaluate the cost and the performance of such services.
b. Books and records pertaining to costs shall be kept and prepared in accordance with generally accepted accounting principles . Eddie Gleason, Facilities Manager , or his designee, shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit, and make records and transcripts from such records.
d. Records and supporting documents pertaining to the use of funds paid to Contractor hereunder shall be retained by Contractor and made available to Eddie Gleason, Facilities Manager, or his designee, for purposes of performing an audit for a period of five (5) years from the date of termination of this Agreement.
Section 21. MODIFICATIONS AND AMENDMENTS
This Agreement may be modified or amended only by a written instrument signed by both Parties.
Section 22. ENTIRE AGREEMENT
a. This Agreement supersedes any and all prior or contemporaneous agreements, either oral or written, between the City and Contractor with respect to the subject matter of this Agreement.
b. The Contract Documents contain all of the covenants and agreements between the Parties with respect to the subject matter herein, and each Party acknowledges that no representations, inducements, promises, or agreements have been made by or on behalf of any Party, except those covenants and agreements in this Agreement and the Contract Documents.
c. No agreement, statement, or promise with respect to the subject matter of the Contract Documents, which is not contained in the Contract Documents, or in a valid modification or amendment to the Contract Documents, shall be valid or binding on either Party.
Section 23. AMBIGUITIES
This Agreement is in all respects intended by each Party hereto to be deemed and construed to have been jointly prepared by the Parties and the Parties hereby expressly agree that any uncertainty or ambiguity existing herein shall not be interpreted against either of them.
Except as expressly limited by this paragraph, all of the applicable rules of interpretation of contract shall govern the interpretation of any uncertainty or ambiguity of this Agreement.
Notwithstanding the foregoing, the Parties agree that Exhibit “B” are attached hereto for reference purposes and to the extent there are any ambiguities, inconsistencies or conflicts between the terms of this Construction Agreement and Exhibit “B”, the terms of this Construction Agreement shall control and nothing set forth in Exhibit “B” shall be deemed to supersede any of the provisions of this Construction Agreement.
9 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
Section 24. NOTICES
a. Any notice to be provided pursuant to this Agreement shall be in writing, and all such notices shall be delivered by personal service or by deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, and addressed to the Parties as follows:
To the City: Eddie Gleason, Facilities Manager
City of Victorville
14343 Civic Drive
Victorville, CA 92392
To Contractor: Lars Rasmussen, President
LM Rasmussen Construction, Inc.
1137 Alpine Heights Rd.
Alpine, CA 91901
b. Notices, payments, and other documents shall be deemed delivered upon receipt by personal service or as of the second (2nd) day after deposit in the United States mail.
Section 25. NON-LIABILITY OF CITY OFFICERS AND EMPLOYEES
No officer or employee of the City shall be personally liable to Contractor, or any successor in interest, in the event of any default or breach by the City or for any amount, which may become due to Contractor or to its successor(s), or for any breach of any obligation of the terms of this Agreement.
Section 26. REVIEW BY ATTORNEYS
Each Party hereto has had its attorneys review this Agreement and all related documents. Each Party hereto has consulted with its attorneys and has negotiated the terms of this Agreement based on such consultation.
Section 27. CARE OF WORK
Contractor must adopt reasonable methods during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and other components to prevent losses or damages, and will be responsible for all damages, to persons or property, until acceptance of the work by the City, except those losses or damages as may be caused by the City’s own negligence. The performance of the work by Contractor or the payment of money by the City shall not relieve Contractor from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to the City, when such inaccuracies are due to the negligence of Contractor.
10 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
Section 28. CAPTIONS AND HEADINGS
The captions and headings contained in this Agreement are provided for identification purposes only and shall not be interpreted to limit or define the content of the provisions described under the respective caption or heading.
Section 29. SUCCESSORS, HEIRS, AND ASSIGNS
Except as otherwise expressly provided herein, this Agreement shall be binding upon the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties to this Agreement and, likewise, shall inure to the benefit of the successors, endorsees, assigns, heirs, and personal representatives of each of the Parties.
Section 30. GENDER; PLURAL
In this Agreement, unless the context clearly requires otherwise, the masculine, feminine and neuter genders and the singular and the plural shall include one another.
Section 31. SEVERABILITY
If any one or more of the sentences, clauses, paragraphs, or sections contained herein is declared invalid, void, or unenforceable by a court of competent jurisdiction, the same shall be deemed severable from the remainder of this Agreement and shall not affect, impair, or invalidate any of the remaining sentences, clauses, paragraphs, or sections contained herein.
Section 32. GOVERNING LAW
The validity of this Agreement and any of its terms or provisions, as well as the rights and duties of the Parties under this Agreement, shall be construed pursuant to and in accordance with California law.
Section 33. CUMULATIVE REMEDIES
Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the Parties are cumulative and the exercise by either Party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default of any other default by the other Party.
Section 34. VENUE
All proceedings involving disputes over the terms, provisions, covenants, or conditions contained in this Agreement and all proceedings involving any enforcement action related to this Agreement shall be initiated and conducted in the applicable court or forum in San Bernardino County, California.
Section 35. ATTORNEY'S FEES
Should any litigation, specifically including but not limited to, arbitration and other non- judicial resolution of disputes be commenced between the Parties to this agreement concerning this agreement or the rights and duties of either i n relation thereto, the Parties prevailing in such litigation or other proceeding shall be entitled, in addition to such other relief as may be granted, to 11 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
a reasonable sum as and for attorney fees in such litigation where the proceeding which, if not agreed upon by the Parties, shall be determined by the court or other entity in which such litigation or other proceeding is brought.
Section 36. EFFECTIVENESS OF AGREEMENT
This Agreement shall not be binding upon the City, until signed by the authorized representative(s) of Contractor , approved by the City’s Risk Manager, and executed by the authorized City personnel or Mayor.
Section 37. REPRESENTATIONS OF PARTIES AND PERSONS
EXECUTING AGREEMENT
a. Each of the Parties to this Agreement hereby represents that all necessary and appropriate actions of their governing bodies have been taken to make this Agreement a binding obligation of each of the Parties hereto.
b. The persons executing this Agreement warrant that they are duly authorized to execute this Agreement on behalf of and bind the Parties each purports to represent.
Section 38. COUNTERPARTS
This Agreement may be executed by the Parties in counterparts, and when executed by each of the Parties, each counterpart shall be deemed to be a part of this Agreement.
(END OF THIS PAGE)
12 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed as of the dates written below.
THE CITY OF VICTORVILLE LM RASMUSSEN CONSTRUCTION, INC.
By:_______________________________ By:_________________________________ Debra Jones, Lars Rasmussen,
Mayor President
Dated:______________________________ Dated:______________________________
ATTEST
By:________________________________
Jennifer Thompson,
City Clerk
Dated:_____________________________
THE CITY OF VICTORVILLE APPROVED AS TO STANDARD FORM
By:________________________________ By:________________________________ John Preston, Andre de Bortnowsky,
Risk Manager City Attorney
Dated:______________________________ Dated:_____________________________
13 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
EXHIBIT A
SCOPE OF WORK
C ity agrees to engage C ontractor and Contractor agrees to furnish all necessary labor, tools, materials, and equipment for and do the Work for the Project. The Work shall be performed in accordance with : (i) the Plans and Specifications and applicable Addenda (as generally described in the Request for Bid, Project Number CC23-079, for the Project, portions of which are attached hereto for ease of reference as Exhibit "A", and the entirety of which is currently on file in office of the City Clerk); and (ii) the prices set forth in Contractor’s Bid Proposal (attached as Exhibit "B").
14 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
EXHIBIT A
CITY OF VICTORVILLE
CC23-079 EXELOO PREFABRICATED RESTROOM INSTALLATION
SCOPE OF WORK
The City of Victorville is requesting bids for the installation of an Exeloo, self -cleaning prefabricated restroom located at both, Center Street & Brentwood Parks. The scope of work shall include all materials and labor necessary for the installation only , as the City has proactively purchased the Exeloo Self- Cleaning Restroom.
The awarding contractor shall comply with all OSHA requirements and safety guidelines associated with the work within this contract. Contractor is also responsible to procure and post any required permits prior to the commencement of work which includes, but is not limited to, the City of Victorville.
The following are the minimum requirements for this project. All bids shall include a fully delivered restroom installation, meeting the following minimum specifications and requirements.
Any deviation or exception must be clearly noted, explained and included with your submitted bid.
PREFABRICATED RESTROOM
• Manufactured by Exeloo.
• Dimensions – approx. 18’ x 7.5’
• See attached drawings and specifications
PREPARATION
Contractor shall:
• Obtain all necessary permits and pay applicable fees. • Install a temporary fence surrounding the entire construction area for the duration of the project.
• Consistently coordinate and update city representatives on the construction schedule. • Provide two (2) weeks advanced written notice prior to the project start date in order for the City to locate and adjust irrigation in the affected areas. (Brentwood Park Site Only) • Remove grass and cap irrigation. Ensure all irrigation repairs are not run under hardscape. (Brentwood Park Site Only).
• Prep site and foundation base, construct grade beams and foundation per the manufacturer’s drawings.
• Extend existing utilities per the manufacturer’s drawings and the approved Precise Grading Plan. Backfill and compact all trenching using a sheeps foot, jumping jack compactor, or vibrating plate.
• Ensure a clear path for crane and delivery truck setup to within 30’ of the unit location.
INSTALLATION
Contractor shall:
• Coordinate delivery of the prefabricated restroom with Exeloo and the City. The delivery and crane rental is NOT to be included in the bid. Exeloo will deliver the prefabricated restroom and crane onto the foundation system. Exeloo has recommended to include 3 Laborers for an 8-hour shift on the day of delivery. This will cover the assistance needed in setting the restroom and the installation of the roof. 15 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
• Provide final utility connections after the prefabricated restroom is set. (Sewer, Water, and Electrical).
• Install prefabricated foam-core roof panels and flashing per manufacturer’s instructions. • Install all flatwork to conform to applicable ADA codes/standard. • Connect all flatwork to existing sidewalks per the Precise Grading Plan. • Connect and repair all damaged irrigation. Ensure proper irrigation coverage around new restroom.
• Replace all damaged grass with Tall Fescue sod.
• Obtain all necessary inspections throughout the permit process.
CLEAN-UP/COMMISSIONING
Contractor shall:
• Properly remove excess spoils and construction debris. • Remove all temporary fencing from the site.
• Provide a final walkthrough with the Parks Department to ensure the irrigation system is operational and sod replacement is acceptable.
• Exeloo will test and commission the operation of the facility and remote communication, but the contractor shall be present to address any repairs that may be needed.
NOTES
• Due to the possibility of sidewalk damage during the prefabricated restroom delivery and cranage, the City is requesting a price per square foot for the flatwork replacement. This is included on the Bid Form of this RFB.
• The City will provide the necessary tree trimming and bollard removal for the crane and truck access.
16 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
EXHIBIT B
BID PROPOSAL FORMS
See Attachment
EXHIBIT B
17/Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-078 17 Construction Agreement/LM Rasmussen Construction, Inc./Project CC23-079
EXHIBIT C
General Federal Wage Decision
See Attachment
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 1/24
"General Decision Number: CA20230026 01/20/2023
Superseded General Decision Number: CA20220026
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
County: San Bernardino County in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
______________________________________________________________ |If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |______________________________|_____________________________| |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. | |______________________________|_____________________________| The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a
conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at
http://www.dol.gov/whd/govcontracts.
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 2/24
Modification Number Publication Date
0 01/06/2023
1 01/13/2023
2 01/20/2023
ASBE0005-002 07/04/2022
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
protective coverings,
coatings, and finishes to all
types of mechanical systems).....$ 49.58 25.27 Fire Stop Technician
(Application of Firestopping
Materials for wall openings
and penetrations in walls,
floors, ceilings and curtain
walls)...........................$ 32.09 19.66 ---------------------------------------------------------------- ASBE0005-004 07/04/2022
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)....$ 23.52 13.37 ---------------------------------------------------------------- BOIL0092-003 01/01/2021
Rates Fringes
BOILERMAKER......................$ 46.03 38.81 ---------------------------------------------------------------- * BRCA0004-011 05/01/2020
Rates Fringes
BRICKLAYER; MARBLE SETTER........$ 41.48 18.63 *The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty-Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the
standard San Bernardino/Riverside County hourly wage rate ---------------------------------------------------------------- BRCA0018-004 06/01/2022
Rates Fringes
MARBLE FINISHER..................$ 37.87 14.13 TILE FINISHER....................$ 32.44 12.54 TILE LAYER.......................$ 45.05 18.33 ---------------------------------------------------------------- BRCA0018-010 09/01/2022
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 3/24
Rates Fringes
TERRAZZO FINISHER................$ 38.37 14.13 TERRAZZO WORKER/SETTER...........$ 46.49 14.66 ---------------------------------------------------------------- CARP0213-001 07/01/2021
Rates Fringes
CARPENTER
(1) Carpenter, Cabinet
Installer, Insulation
Installer, Hardwood Floor
Worker and acoustical
installer...................$ 51.60 16.28
(2) Millwright..............$ 52.10 16.48
(3) Piledrivermen/Derrick
Bargeman, Bridge or Dock
Carpenter, Heavy Framer,
Rock Bargeman or Scowman,
Rockslinger, Shingler
(Commercial)................$ 51.73 16.28
(4) Pneumatic Nailer,
Power Stapler...............$ 51.85 16.28
(5) Sawfiler...............$ 51.69 16.28
(6) Scaffold Builder.......$ 42.80 16.28
(7) Table Power Saw
Operator....................$ 51.70 16.28
FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a
substitute for back forms (which work is performed by
piledrivers): $0.13 per hour additional.
---------------------------------------------------------------- CARP0213-002 07/01/2021
Rates Fringes
Diver
(1) Wet.....................$ 834.40 16.28
(2) Standby.................$ 445.84 16.28
(3) Tender..................$ 437.84 16.28
(4) Assistant Tender........$ 413.84 16.28
Amounts in ""Rates' column are per day
---------------------------------------------------------------- CARP0213-004 07/01/2021
Rates Fringes
Drywall
DRYWALL INSTALLER/LATHER....$ 51.60 16.28
STOCKER/SCRAPPER............$ 22.16 8.62
---------------------------------------------------------------- CARP0721-001 07/01/2021
Rates Fringes
Modular Furniture Installer......$ 21.85 7.15 ----------------------------------------------------------------
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 4/24
ELEC0440-004 12/27/2021
COMMUNICATIONS AND SYSTEMS WORK
Rates Fringes
Communications System
Installer...................$ 39.60 3%+16.89
Technician..................$ 33.09 15.89
SCOPE OF WORK:
Installation, testing, service and maintenance of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational,
security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control
systems, microwave transmission, multi-media, multiplex, nurse call systems, radio page, school intercom and sound, burglar alarms, fire alarms, and low voltage master clock systems in commercial buildings. Communication Systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding all other data
systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Does not cover work performed at China Lake Naval Ordnance Test Station.
---------------------------------------------------------------- ELEC0477-002 06/01/2021
Rates Fringes
Electricians:....................$ 45.75 3%+25.33 CABLE SPLICER: $1.50 per hour above Electrician rate.
TUNNEL WORK: 10% above Electrician rate.
ZONE PAY:
Zone A - 80 road miles from Post Office, 455 Orange Show Lane, San Bernardino, will be a free zone for all
contractors
Zone B - Any work performed outside Zone A's 80 road miles, shall add $12.00 per hour to the current wage scale.
---------------------------------------------------------------- ELEC1245-001 06/01/2022
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 64.40 22.58
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment).............$ 50.00 21.30
(3) Groundman...............$ 38.23 20.89
(4) Powderman...............$ 51.87 18.79
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 5/24
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
---------------------------------------------------------------- ELEV0018-001 01/01/2023
Rates Fringes
ELEVATOR MECHANIC................$ 63.95 37.335+a+b FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
---------------------------------------------------------------- ENGI0012-003 07/01/2022
Rates Fringes
OPERATOR: Power Equipment
(All Other Work)
GROUP 1....................$ 51.90 30.70
GROUP 2....................$ 52.68 30.70
GROUP 3....................$ 52.97 30.70
GROUP 4....................$ 54.46 30.70
GROUP 5....................$ 48.96 25.25
GROUP 6....................$ 54.68 30.70
GROUP 8....................$ 54.79 30.70
GROUP 9....................$ 49.29 25.25
GROUP 10....................$ 54.91 30.70
GROUP 11....................$ 49.41 25.25
GROUP 12....................$ 55.08 30.70
GROUP 13....................$ 55.18 30.70
GROUP 14....................$ 55.21 30.70
GROUP 15....................$ 55.29 30.70
GROUP 16....................$ 55.41 30.70
GROUP 17....................$ 55.58 30.70
GROUP 18....................$ 55.68 30.70
GROUP 19....................$ 55.79 30.70
GROUP 20....................$ 55.91 30.70
GROUP 21....................$ 56.08 30.70
GROUP 22....................$ 56.18 30.70
GROUP 23....................$ 56.29 30.70
GROUP 24....................$ 56.41 30.70
GROUP 25....................$ 56.58 30.70
OPERATOR: Power Equipment
(Cranes, Piledriving &
Hoisting)
GROUP 1....................$ 53.25 30.70
GROUP 2....................$ 54.03 30.70
GROUP 3....................$ 54.32 30.70
GROUP 4....................$ 54.46 30.70
GROUP 5....................$ 54.68 30.70
GROUP 6....................$ 54.79 30.70
GROUP 7....................$ 54.91 30.70
GROUP 8....................$ 55.08 30.70
GROUP 9....................$ 55.25 30.70
GROUP 10....................$ 56.25 30.70
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 6/24
GROUP 11....................$ 57.25 30.70
GROUP 12....................$ 58.25 30.70
GROUP 13....................$ 59.25 30.70
OPERATOR: Power Equipment
(Tunnel Work)
GROUP 1....................$ 54.53 30.70
GROUP 2....................$ 54.82 30.70
GROUP 3....................$ 54.96 30.70
GROUP 4....................$ 55.18 30.70
GROUP 5....................$ 55.29 30.70
GROUP 6....................$ 55.41 30.70
GROUP 7....................$ 55.71 30.70
PREMIUM PAY:
$3.75 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval
Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp
Pendleton
Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator.
SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator
operator-inside; Engineer Oiler; Forklift operator
(includes loed, lull or similar types under 5 tons;
Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse tank operator); Concrete mixer operator-skip type; Conveyor operator;
Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd.
without attachment); Tar pot fireman; Temporary heating plant operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground); Stationary pipe wrapping and cleaning machine operator
GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator; Concrete cleaning decontamination machine operator;
Concrete Pump Operator (small portable); Drilling machine operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types -
drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling
(above ground tunnel); Power concrete curing machine
operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 7/24
Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck
GROUP 5: Equipment Greaser (Grease Truck/Multi Shift).
GROUP 6: Articulating material hauler; Asphalt plant
engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator;
Derrickman (oilfield type); Drilling machine operator,
bucket or auger types (Calweld 100 bucket or similar types - Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45'
maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track
maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete,
Clary-Johnson-Bidwell or similar); Micro tunnel system
(below ground); Pavement breaker operator (truck mounted); Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator
(crawler and wheel type, over 3/4 yd. and up to and
including 1-1/2 yds.); Slip form pump operator (power
driven hydraulic lifting device for concrete forms);
Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and
including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator
GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator; Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast-in-place pipe laying machine
operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Drill Doctor; Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types - drilling depth of 60' maximum); Elevating grader operator; Grade checker; Gradall operator; Grouting machine operator; Heavy-duty repairman; Heavy equipment robotics operator; Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or
similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar type);
Pumpcrete gun operator; Rock Drill or similar types; Rotary drill operator (excluding caisson type); Rubber-tired
earth-moving equipment operator (single engine,
caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment operator (multiple engine up to and including 25 yds. struck);
Rubber-tired scraper operator (self-loading paddle wheel type-John Deere, 1040 and similar single unit); Self-
propelled curb and gutter machine operator; Shuttle buggy;
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 8/24
Skiploader operator (crawler and wheel type over 1-1/2 yds. up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor
compressor drill combination operator; Tractor operator (any type larger than D-5 - 100 flywheel h.p. and over, or similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator;
Trenching machine operator (over 6 ft. depth capacity,
manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull
(compaction) operator
GROUP 9: Heavy Duty Repairman
GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar
types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail
locomotive operator (diesel, gas or electric); Motor
patrol-blade operator (single engine); Multiple engine
tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator; Rubber-tired earth-moving equipment operator (single
engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment)
GROUP 11: Heavy Duty Repairman - Welder Combination, Welder - Certified.
GROUP 12: Auto grader operator; Automatic slip form operator; Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson, auger 6000 or
similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less tha 750 cu. yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi-engine); Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units)
GROUP 13: Rubber-tired earth-moving equipment operator
operating equipment with push-pull system (single engine, up to and including 25 yds. struck)
GROUP 14: Canal liner operator; Canal trimmer operator; Remote- control earth-moving equipment operator (operating a second piece of equipment: $1.00 per hour additional); Wheel excavator operator (over 750 cu. yds.)
GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 9/24
yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple
engine-up to and including 25 yds. struck)
GROUP 16: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system
(multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck); Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type)
GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, up to and including 25 yds. struck)
GROUP 19: Rotex concrete belt operator (or similar types); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any
combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment
operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction
units - multiple engine, up to and including 25 yds. struck) GROUP 20: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
single engine, over 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating in tandem
(scrapers, belly dumps, and similar types in any
combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar
types in any combination, excluding compaction units -
multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck)
GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, up to and including 25 yds. struck)
GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, Caterpillar, Euclid, Athey Wagon and
similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired
earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck)
GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system
(single engine, over 50 yds. struck); Rubber-tired
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 10/24
earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid,
Caterpillar and similar type, over 50 cu. yds. struck)
CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS GROUP 1: Engineer oiler; Fork lift operator (includes loed, lull or similar types)
GROUP 2: Truck crane oiler
GROUP 3: A-frame or winch truck operator; Ross carrier
operator (jobsite)
GROUP 4: Bridge-type unloader and turntable operator;
Helicopter hoist operator
GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum)
GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile
operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar
gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane
repair; Tugger hoist operator (3 drum)
GROUP 8: Crane operator (up to and including 25 ton
capacity); Crawler transporter operator; Derrick barge
operator (up to and including 25 ton capacity); Hoist
operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.)
GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons
GROUP 10: Crane operator (over 50 tons and up to and
including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.); Tower crane operator and tower gantry
GROUP 11: Crane operator (over 100 tons and up to and
including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 11/24
to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc)
GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and
including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc)
GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons)
TUNNEL CLASSIFICATIONS
GROUP 1: Skiploader (wheel type up to 3/4 yd. without
attachment)
GROUP 2: Power-driven jumbo form setter operator
GROUP 3: Dinkey locomotive or motorperson (up to and
including 10 tons)
GROUP 4: Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons)
GROUP 5: Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading
shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons)
GROUP 6: Heavy Duty Repairman
GROUP 7: Tunnel mole boring machine operator
ENGINEERS ZONES
$1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below:
That area within the following Boundary: Begin in San
Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 6, T25S, R42E, MDM. Continue W along the Inyo and San
Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM. Continue W along the Inyo and Kern County
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 12/24
boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM.
Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM.
Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM.
Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM.
Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line. Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM
$1.00 additional per hour for portions of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below:
That area within the following Boundary: Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Obispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian. Continue south along the west side of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW corner of T30S, R17E, MDM. Continue S to SW corner of T31S, R17E, MDM. Continue E to SW corner of T31S, R18E, MDM.
Continue S along West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W. Follow the west side of R30W, SBM to the SW corner of T9N, R30W, SBM.
Continue E along the south edge of T9N, SBM to the Santa Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE quarter of Section 32, T7N, R24W, SBM. Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM. Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of T8N, R21W.
Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W. Continue North along the East edge of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue West along the north edge of T12N, SBM to the SE corner of T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM]. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County. Continue west along the Kings County and San Luis Obispo County boundary until the intersection with Monterey County. Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM.
$2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below:
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 13/24
That area within the following Boundary: Begin at the
intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then SE along the entire western boundary of Mono County, until it reaches Inyo County at the point which is the NE corner of the Western half of the NW quarter of Section 2, T8S, R29E, MDM.
Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM.
Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T24S, R40E, MDM. Continue E along the Inyo and San Bernardino County boundary until the point which is the NE corner of the Western half of the NW quarter of Section 6, T25S, R42E, MDM. Continue S to that point which is the SW corner of the NW quarter of Section 6, T27S, R42E, MDM.
Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R14E, San Bernardino Meridian. Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM.
REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RATE
---------------------------------------------------------------- ENGI0012-004 08/01/2022
Rates Fringes
OPERATOR: Power Equipment
(DREDGING)
(1) Leverman................$ 61.60 32.50
(2) Dredge dozer............$ 55.63 32.50
(3) Deckmate................$ 55.52 32.50
(4) Winch operator (stern
winch on dredge)............$ 54.97 32.50
(5) Fireman-Oiler,
Deckhand, Bargeman,
Leveehand...................$ 54.43 32.50
(6) Barge Mate..............$ 55.04 32.50
---------------------------------------------------------------- IRON0433-006 01/01/2023
Rates Fringes
IRONWORKER
Fence Erector...............$ 41.28 25.66
Ornamental, Reinforcing
and Structural..............$ 46.20 34.30
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 14/24
Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0300-005 08/01/2022
Rates Fringes
Asbestos Removal Laborer.........$ 39.23 23.28 SCOPE OF WORK: Includes site mobilization, initial site cleanup, site preparation, removal of asbestos-containing material and toxic waste, encapsulation, enclosure and
disposal of asbestos- containing materials and toxic waste by hand or with equipment or machinery; scaffolding,
fabrication of temporary wooden barriers and assembly of decontamination stations.
---------------------------------------------------------------- LABO0345-001 07/01/2022
Rates Fringes
LABORER (GUNITE)
GROUP 1.....................$ 48.50 21.37
GROUP 2.....................$ 47.55 21.37
GROUP 3.....................$ 44.01 21.37
FOOTNOTE: GUNITE PREMIUM PAY: Workers working from a
Bosn'n's Chair or suspended from a rope or cable shall receive 40 cents per hour above the foregoing applicable classification rates. Workers doing gunite and/or
shotcrete work in a tunnel shall receive 35 cents per hour above the foregoing applicable classification rates, paid on a portal-to-portal basis. Any work performed on, in or above any smoke stack, silo, storage elevator or similar type of structure, when such structure is in excess of 75'-0"" above base level and which work must be performed in whole or in part more than 75'-0"" above base level, that work performed above the 75'-0"" level shall be compensated for at 35 cents per hour above the applicable
classification wage rate.
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Rodmen, Nozzlemen
GROUP 2: Gunmen
GROUP 3: Reboundmen
---------------------------------------------------------------- LABO0783-002 07/01/2022
Rates Fringes
LABORER (TUNNEL)
GROUP 1.....................$ 45.68 23.30
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 15/24
GROUP 2.....................$ 46.00 23.30
GROUP 3.....................$ 46.46 23.30
GROUP 4.....................$ 47.15 23.30
LABORER
GROUP 1.....................$ 36.39 21.04
GROUP 2.....................$ 36.94 21.04
GROUP 3.....................$ 37.49 21.04
GROUP 4.....................$ 39.04 21.04
GROUP 5.....................$ 39.39 21.04
LABORER CLASSIFICATIONS
GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike-off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or
water pipeline laborer; Laborer, asphalt-rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator
(walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete; Railroad maintenance, repair track person and road beds; Streetcar and railroad construction track laborers; Rigging and signaling; Scaler; Slip form raiser; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations
GROUP 2: Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and
installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curbs, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water
pipeline wrapper - pot tender and form person; Guinea
chaser; Headerboard person - asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Roto scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer(lead); Tank scaler and cleaner; Tree climber, faller, chain saw
operator, Pittsburgh chipper and similar type brush
shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi-plate; Kettle person, pot person and workers applying asphalt, lay-kold,
creosote, lime caustic and similar type materials
(""applying"" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating
machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services;
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 16/24
Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barko, Wacker and similar type; Trenching machine, hand-propelled
GROUP 4: Asphalt raker, lute person, ironer, asphalt dump person, and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand-guided lagging hammer; Head rock
slinger; Laborer, asphalt- rubber distributor boot person; Laser beam in connection with laborers' work; Oversize
concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in the ditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic, conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No-joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster
(nozzle person), water blasting, Porta Shot-Blast
GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical drills without regard to the form of motive power; Toxic waste removal
TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Batch plant laborer; Changehouse person; Dump
person; Dump person (outside); Swamper (brake person and switch person on tunnel work); Tunnel materials handling person; Nipper; Pot tender, using mastic or other materials (for example, but not by way of limitation, shotcrete, etc.) GROUP 2: Chucktender, cabletender; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic
tools (except driller); Bull gang mucker, track person; Concrete crew, including rodder and spreader
GROUP 3: Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout pump person; Jackleg miner; Jumbo person; Kemper and other pneumatic concrete placer operator; Miner, tunnel (hand or machine); Nozzle person; Operating of
troweling and/or grouting machines; Powder person (primer house); Primer person; Sandblaster; Shotcrete person; Steel form raiser and setter; Timber person, retimber person, wood or steel; Tunnel Concrete finisher
GROUP 4: Diamond driller; Sandblaster; Shaft and raise work ---------------------------------------------------------------- LABO0783-005 07/01/2022
Rates Fringes
Brick Tender.....................$ 37.32 21.45
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 17/24
---------------------------------------------------------------- LABO1184-001 07/01/2022
Rates Fringes
Laborers: (HORIZONTAL
DIRECTIONAL DRILLING)
(1) Drilling Crew Laborer...$ 40.69 18.25
(2) Vehicle Operator/Hauler.$ 40.86 18.25
(3) Horizontal Directional
Drill Operator..............$ 42.71 18.25
(4) Electronic Tracking
Locator.....................$ 44.71 18.25
Laborers: (STRIPING/SLURRY
SEAL)
GROUP 1.....................$ 41.90 21.32
GROUP 2.....................$ 43.20 21.32
GROUP 3.....................$ 45.21 21.32
GROUP 4.....................$ 46.95 21.32
LABORERS - STRIPING CLASSIFICATIONS
GROUP 1: Protective coating, pavement sealing, including repair and filling of cracks by any method on any surface in parking lots, game courts and playgrounds; carstops; operation of all related machinery and equipment; equipment repair technician
GROUP 2: Traffic surface abrasive blaster; pot tender - removal of all traffic lines and markings by any method (sandblasting, waterblasting, grinding, etc.) and
preparation of surface for coatings. Traffic control
person: controlling and directing traffic through both
conventional and moving lane closures; operation of all related machinery and equipment
GROUP 3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers, other traffic delineating devices including traffic control. This
category includes all traffic related surface preparation (sandblasting, waterblasting, grinding) as part of the
application process. Traffic protective delineating system installer: removes, relocates, installs, permanently
affixed roadside and parking delineation barricades,
fencing, cable anchor, guard rail, reference signs,
monument markers; operation of all related machinery and equipment; power broom sweeper
GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all
related machinery and equipment
---------------------------------------------------------------- LABO1414-003 08/03/2022
Rates Fringes
LABORER
PLASTER CLEAN-UP LABORER....$ 38.92 23.32
PLASTER TENDER..............$ 41.47 23.32
Work on a swing stage scaffold: $1.00 per hour additional.
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 18/24
Work at Military Bases - $3.00 additional per hour:
Coronado Naval Amphibious Base, Fort Irwin, Marine Corps Air Station-29 Palms, Imperial Beach Naval Air Station, Marine Corps Logistics Supply Base, Marine Corps Pickle Meadows, Mountain Warfare Training Center, Naval Air
Facility-Seeley, North Island Naval Air Station, Vandenberg AFB.
---------------------------------------------------------------- PAIN0036-001 07/01/2020
Rates Fringes
Painters: (Including Lead
Abatement)
(1) Repaint (excludes San
Diego County)...............$ 29.59 17.12
(2) All Other Work..........$ 33.12 17.24
REPAINT of any previously painted structure. Exceptions:
work involving the aerospace industry, breweries,
commercial recreational facilities, hotels which operate commercial establishments as part of hotel service, and sports facilities.
---------------------------------------------------------------- PAIN0036-008 09/01/2022
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 46.28 23.52 ---------------------------------------------------------------- PAIN0036-015 01/01/2020
Rates Fringes
GLAZIER..........................$ 43.45 23.39 FOOTNOTE: Additional $1.25 per hour for work in a condor, from the third (3rd) floor and up Additional $1.25 per hour for work on the outside of the building from a swing stage or any suspended contrivance, from the ground up
---------------------------------------------------------------- PAIN1247-002 08/01/2022
Rates Fringes
SOFT FLOOR LAYER.................$ 39.95 15.28 ---------------------------------------------------------------- PLAS0200-008 08/03/2022
Rates Fringes
PLASTERER........................$ 47.37 19.64 FORT IRWIN; MARINE CORPS AIR STATION 29 PALMS, AND MARINE CORPS LOGISTICS SUPPLY BASE: $3.00 additional per hour. ---------------------------------------------------------------- PLAS0500-002 07/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 38.50 25.91
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 19/24
---------------------------------------------------------------- PLUM0016-002 09/01/2022
Rates Fringes
PLUMBER, PIPEFITTER,
STEAMFITTER
Work at Edwards AFB.........$ 62.18 26.26
Work at Fort Irwin Army
Base........................$ 65.68 26.26
Work at Marine Corps
Logistic Base at Nebo,
Marine Corps Logistic Base
at Yermo and Twenty-Nine
Palms Marine Base...........$ 62.18 26.26
Work ONLY on new additions
and remodeling of bars,
restaurants, stores and
commercial buildings, not
to exceed 5,000 sq. ft. of
floor space.................$ 53.51 25.28
Work ONLY on strip malls,
light commercial, tenant
improvement and remodel
work........................$ 40.95 23.61
All other work except work
on new additions and
remodeling of bars,
restaurant, stores and
commercial buildings not
to exceed 5,000 sq. ft. of
floor space and work on
strip malls, light
commercial, tenant
improvement and remodel
work........................$ 55.18 26.26
---------------------------------------------------------------- PLUM0345-001 09/01/2022
Rates Fringes
PLUMBER
Landscape/Irrigation Fitter.$ 38.20 25.65
Sewer & Storm Drain Work....$ 42.29 23.03
---------------------------------------------------------------- ROOF0036-002 08/01/2022
Rates Fringes
ROOFER...........................$ 43.47 19.52 FOOTNOTE: Pitch premium: Work on which employees are exposed to pitch fumes or required to handle pitch, pitch base or pitch impregnated products, or any material containing coal tar pitch, the entire roofing crew shall receive $1.75 per hour ""pitch premium"" pay.
---------------------------------------------------------------- SFCA0669-009 01/01/2023
Does not include the northern part of the City of Chino, or the Cities of Montclair and Ontario
Rates Fringes
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 20/24
SPRINKLER FITTER.................$ 43.25 27.33 ---------------------------------------------------------------- SFCA0709-004 01/01/2021
THE NORTHERN PART OF THE CITY OF CHINO, AND THE CITIES OF MONTCLAIR AND ONTARIO:
Rates Fringes
SPRINKLER FITTER (Fire)..........$ 48.71 29.15 ---------------------------------------------------------------- * SHEE0105-003 01/01/2023
LOS ANGELES (South of a straight line drawn between Gorman and Big Pines)and Catalina Island, INYO, KERN (Northeast part, East of Hwy 395), MONO ORANGE, RIVERSIDE, AND SAN BERNARDINO COUNTIES Rates Fringes
SHEET METAL WORKER
(1) Commercial - New
Construction and Remodel
work........................$ 53.67 29.74
(2) Industrial work
including air pollution
control systems, noise
abatement, hand rails,
guard rails, excluding
aritechtural sheet metal
work, excluding A-C,
heating, ventilating
systems for human comfort...$ 53.67 29.74
---------------------------------------------------------------- TEAM0011-002 07/01/2020
Rates Fringes
TRUCK DRIVER
GROUP 1....................$ 32.59 30.59
GROUP 2....................$ 32.74 30.59
GROUP 3....................$ 32.87 30.59
GROUP 4....................$ 33.06 30.59
GROUP 5....................$ 33.09 30.59
GROUP 6....................$ 33.12 30.59
GROUP 7....................$ 33.37 30.59
GROUP 8....................$ 33.62 30.59
GROUP 9....................$ 33.82 30.59
GROUP 10....................$ 34.12 30.59
GROUP 11....................$ 34.62 30.59
GROUP 12....................$ 35.05 30.59
WORK ON ALL MILITARY BASES:
PREMIUM PAY: $3.00 per hour additional.
[29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB, El Centro Naval Facility, Fort Irwin, Marine Corps
Logistics Base at Nebo & Yermo, Mountain Warfare Training Center, Bridgeport, Point Arguello, Point Conception, Vandenberg AFB]
TRUCK DRIVERS CLASSIFICATIONS
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 21/24
GROUP 1: Truck driver
GROUP 2: Driver of vehicle or combination of vehicles - 2 axles; Traffic control pilot car excluding moving heavy equipment permit load; Truck mounted broom
GROUP 3: Driver of vehicle or combination of vehicles - 3 axles; Boot person; Cement mason distribution truck; Fuel truck driver; Water truck - 2 axle; Dump truck, less than 16 yds. water level; Erosion control driver
GROUP 4: Driver of transit mix truck, under 3 yds.; Dumpcrete truck, less than 6-1/2 yds. water level
GROUP 5: Water truck, 3 or more axles; Truck greaser and tire person ($0.50 additional for tire person); Pipeline and utility working truck driver, including winch truck and plastic fusion, limited to pipeline and utility work;
Slurry truck driver
GROUP 6: Transit mix truck, 3 yds. or more; Dumpcrete truck, 6-1/2 yds. water level and over; Vehicle or combination of vehicles - 4 or more axles; Oil spreader truck; Dump truck, 16 yds. to 25 yds. water level
GROUP 7: A Frame, Swedish crane or similar; Forklift driver; Ross carrier driver
GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck repair person; Water pull - single engine; Welder
GROUP 9: Truck repair person/welder; Low bed driver, 9 axles or over
GROUP 10: Dump truck - 50 yds. or more water level; Water pull - single engine with attachment
GROUP 11: Water pull - twin engine; Water pull - twin engine with attachments; Winch truck driver - $1.25 additional when operating winch or similar special attachments
GROUP 12: Boom Truck 17K and above
---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 22/24
violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at
https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 23/24
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
EXHIBIT C
1/23/23, 4:47 PM SAM.gov
https://sam.gov/wage-determination/CA20230026/2 24/24
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISIO"
EXHIBIT C
Item Number: 19
City Council / Board of Directors
Written Communications
Meeting of: February 21, 2023
Submitted By:
Doug Mathews, Director of Public Works and Water
Subject:
California Department of Water Resources – 2022 Urban Community Drought Relief Grant Program
Recommendation:
That the Honorable Victorville Water District Board of Directors adopt Resolution No.
VWD 23-002, authorizing the 2022 Urban Community Drought Relief Grant Program application, acceptance, and execution for the District’s Advance Metering Infrastructure (AMI), Turf Replacement Rebate, and Ultra-High Efficiency Toilet Direct Installation Replacement Projects.
Fiscal Impact:
There is no fiscal impact associated with this item. If the District is successful in securing grant funding, staff will bring a subsequent item before the Board of Directors (“Board”) to appropriate grant funds.
Strategic Plan Goal:
This item aligns with Goal A, Strategy 3 in the Strategic Plan, “Financial Stability” and “Identify new revenue opportunities and cost control measures.” Grant funding would provide the District financial resources to offer rate payers programs, at no additional cost, that would reduce water use, water loss, and the District’s water production costs.
Background:
In June 2022, the California legislature amended the Budget Act of 2021 to allocate an additional $545 million to the California Department of Water Resources to address drought relief, immediate impacts on human health and safety, to secure the future of California’s water supply, and to protect fish and wildlife resources. This grant program prioritizes funding for projects addressing immediate drought response, turf replacement, and water conservation activities for urban suppliers.
2 9
9 1
The minimum grant amount per agency is three million dollars and smaller projects can be bundled together in a single application to meet the minimum requirement. Matching funds are required up to 25%; however, applicants can apply to have the cost share requirements waived if projects provide at least 50% of the primary benefit to an underrepresented/disadvantaged community. The U.S. Census Bureau’s American Community Survey specifies that 18.8% of Victorville residents are below the National Poverty Line and considered a Severely Disadvantage Community (SDAC), and as such the District qualifies as an underrepresented community and has requested a waiver of the matching funds.
Awards are expected to be announced in Spring of 2023 and funds must be fully expended within three years after award. Applications not funded in the first round will automatically be considered for further rounds of funding.
Discussion:
The District is seeking to obtain a total of $5,675,000 for three projects:
(1) $3,500,000 for the turf replacement project (a.k.a. “Cash for Grass” program); (2) $675,000 for the ultra-high efficiency toilet replacement project; and (3) $1,500,000 for the Advance Metering Infrastructure (AMI) project.
The Cash for Grass program previously offered by the District was funded through the Mojave Water Agency. This program, along with the Toilet Replacement program were incredibly successful in helping the District meet its conservation goals. Due to funds being exhausted, both programs are currently not offered. The District would like to bring these programs back to help meet State mandated conservation goals.
The AMI project is currently in progress and funding is approved in this fiscal year’s budget. If the District is successful in obtaining grant funding, the budgeted funds could be re-allocated towards next year’s CIP (or for any matching requirements if a waiver is not granted). This would help the District reduce costs and ultimately help keep water rates as low as possible. Moreover, the combined water savings from the three projects are estimated to save upwards of ten percent of annual water production.
Per the California Department of Water Resources’ guidelines and proposal solicitation package (GL/PSP), the deadline for application submittal was January 31, 2023. The District was able to successfully meet that deadline and submit the required application.
Additionally, the GL/PSP requires a resolution certifying the approval by the District’s governing Board prior to execution of the grant agreement that is required should the District be awarded any funds.
Resolution No. VWD 23-002 authorizes the General Manager or his designee to apply for the grant on behalf of the District to fund the three specified projects, execute all documents associated with the application (including a funding agreement), and accept the grant funds if awarded. The application submitted is included as Attachment B to this report.
2 9
9 1
Staff recommends that the Board of Directors adopt Resolution No. VWD 23-002, authorizing the District General Manager or designee to apply for, accept, and execute required documents in the event grant funds from the 2022 Urban Community Drought Relief Grant Program are awarded for the projects proposed by the District.
Staff is available for any questions the Board may have.
Attachments: A. Resolution No. VWD 23-002
B. Grant Application
1 3
2 2
6 ATTACHMENT A
Resolution VWD 23-002
1 3
2 2
6 VICTORVILLE WATER DISTRICT
RESOLUTION NO. VWD 23-002
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE VICTORVILLE
WATER DISTRICT AUTHORIZING THE GRANT APPLICATION,
ACCEPTANCE, AND EXECUTION FOR THE VICTORVILLE WATER DISTRICT
ADVANCED METERING INFRASTRUCTURE (AMI), TURF REPLACEMENT
REBATE, AND ULTRA-HIGH EFFICIENT TOILET DIRECT INSTALLATION
REPLACEMENT PROJECTS (CALIFORNIA DEPARTMENT OF WATER
RESOURCES 2022 URBAN COMMUNITY DROUGHT RELIEF GRANT
PROGRAM)
WHEREAS, the Victorville Water District is committed to securing the future of California’s water supply, improving its drought resilience, and continuously providing high quality drinking water; and
WHEREAS, in June of 2022, the Legislature and Governor of the State of California allocated five hundred and forty-five million dollars to the California Department of Water Resources to provide grants under the Urban Community Drought Relief Program; and WHEREAS, the California Department of Water Resources has been delegated the responsibility for the administration of this grant program, establishing necessary procedures; and WHEREAS, said procedures require a resolution of the potential grantee’s governing body authorizing the application for a grant under the program that designates a representative to sign the application, and in the event of an award of grant funds, a representative to execute the funding agreement and all necessary documentation, either before submission of said application to the California Department of Water Resources, or prior to execution of the grant agreement; and
WHEREAS, the Victorville Water District proposes to implement the Advanced Metering Infrastructure (AMI), Turf Replacement Rebate, and Ultra-High Efficient Toilet Direct Installation Replacement Projects; and
WHEREAS, the Victorville Water District has the legal authority and is authorized to enter into a funding agreement with the State of California; and WHEREAS, The Victorville Water District intends to apply for grant funding from the California Department of Water Resources for the Advanced Metering Infrastructure (AMI), Turf Replacement Rebate, and Ultra-High Efficient Toilet Direct Installation Replacement Projects.
NOW, THEREFORE, THE BOARD OF DIRECTORS OF THE VICTORVILLE WATER DISTRICT DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS:
Section 1. That pursuant and subject to all of the terms and provisions of the California Budget Act of 2021 (Stats. 2021, ch. 240, § 80) as amended (Stats. 2022, ch. 44, § 25), the Victorville Water District General Manager, or designee is hereby authorized and directed to prepare and file an application for funding with the State of California Department of Water Resources and take such other actions necessary or appropriate to obtain grant funding. 1 3
2 2
6 Section 2. That the Victorville Water District General Manager, or designee is hereby authorized and directed to execute the funding agreement with the State of California Department of Water Resources and any amendments thereto if a grant is awarded.
Section 3. That the Victorville Water District General Manager, or designee is hereby authorized and directed to submit any required documents, invoices, and reports required to obtain grant funding.
Section 4. That the recitals set forth above are true and correct and are hereby incorporated in their entirety as part of this Resolution by this reference.
Section 5. That the Victorville Water District Secretary shall certify to the adoption of this Resolution.
Section 6. That this Resolution shall take effect immediately upon its adoption.
ATTACHMENT B
Grant Applica�on
2022 Urban Community Drought Relief GL/PSP
Grant Application Form
The following outlines the required questions included in the application form for reference. Applicants must complete the application form via GRanTS to be considered for this grant opportunity. The following table outlines the required application questions as they will appear in the GRanTS system with instructions on how to answer each question.
APPLICANT INFORMATION TAB
The following information is general and applies to the applicant and the overall proposal. Specific project information should be detailed in the project tab provided in the GRanTS application. Required questions are marked with an *.
APPLICANT INFORMATION
*Organization Name: Provide the name of the Agency/Organization responsible for submitting the application. Should the application be successful, this Agency/Organization will be the Grantee.
Victorville Water District
*Point of Contact:
Doug Mathews, [email protected] 760-243-6332, Public Works and Water, 14343 Civic Drive, Victorville, CA, and 92393
*Point of Contact Position Title: This should be the day-to-day manager for the application 50 Director of Public Works & Water
*Proposal Name: Please enter Urban Drought 2022<Applicant Name> Proposal. (Maximum Character Limit:150)
Urban Drought 2022<Victorville Water District>Proposal
*Proposal Objective: Please briefly describe the proposal. 2000
The City of Victorville Water District (VWD) proposes the use of Turf Replacement Rebates, Ultra-High Efficient Toilet Installations, and Advanced Metering Infrastructure (AMI) to save 2,325 acre-feet per year (AFY) of precious potable water. The entire VWD service area is classified as an Underrepresented Community (URC)/Disadvantaged Community (DAC) with a high Severely DAC (SDAC) ratio. With 134,810 citizens and 37,000 meter connections, Victorville is frequently described as a ‘bedroom community’ providing the low-income workforce to nearby Los Angeles. The City occupies a portion of California’s Inland Desert region with very low annual precipitation annually making it very sensitive to drought conditions. To provide enough water for its ratepayers, VWD relies heavily on groundwater pumping from 34 active wells and imported water from the State Water Project (SWP) delivered via their watermaster, the Mojave Water Agency (MWA). However, groundwater quality has proven challenging with high levels of arsenic, nitrates, iron, manganese, and Chromium-VI. Imported water presents its own quality problems as supply from the SWP is testing increasingly high in selenium and sodium. Improving water quality requires having enough potable water available for mixing and diluting, made all the more challenging by drought conditions. The three projects embedded in this proposal- Turf Replacement, UHE Toilets, and AMI – are designed to comprehensively lower consumption and reduce groundwater pumping by conserving 2,325 AFY of potable water. The additional water will prevent VWD from importing increasingly expensive water and ensuring it has enough water available to provide safe, drinkable quality water. Each project will be supported by a multi-language outreach campaign and VWD anticipated completing all milestones within grant timeframe. Proposal success will be measured via conservation levels and annual customer surveys 2022 Urban Community Drought Relief GL/PSP
PROPOSAL BUDGET
For the proposal, the following budget items should be transferred from the Proposal Summary Form where applicable.
Other Contribution: Leave Blank; Information is requested later in the application Local Contribution: Leave Blank; Information is requested later in the application Federal Contribution: Leave Blank; Information is requested later in the application In-kind Contribution: Leave Blank; Information is requested later in the application
*Amount Requested (Grant Funds Requested): Provide the amount of total grant funds requested. $5,675,000
Total Proposal Cost: Total proposal cost is automatically calculated based on the contribution amounts entered above.
GEOGRAPHIC INFORMATION
GRanTS requests latitude and longitude in degrees, minutes, and seconds. You may use converters on the web such as https://www.fcc.gov/media/radio/dms-decimal. *Latitude: Project Location 34.510860
*Longitude: Project Location : -117.323990
*Longitude/Latitude Clarification: Only use if necessary. (Maximum Character Limit: 250) Location: Leave Blank
2022 Urban Community Drought Relief GL/PSP
*County(ies): Provide the county in which the project is located. If the project covers multiple counties hold the control key down and select all that apply.
San Bernadino County
Groundwater Basins: Leave Blank
Hydrologic Regions: Leave Blank
Watershed(s): Leave Blank
*LEGISLATIVE INFORMATION
Enter the State Assembly, State Senate, and U.S. Congressional Districts in which the project is located (use district numbers only, not the name of the Legislator). For projects that include more than one district, Hold the control key down and select all that apply.
State Assembly (District 39) State Senate (District 21) U.S. Congressional (District 23rd)
PROJECTS TAB
The Project tab is required by GRanTS and cannot be deleted. The Projects Tab should not be used for your application but rather filled in with data as indicated below. Please utilize the appropriate Project Information tab for Project 1, 2, 3, etc. of your proposal. For grant admin, the only fields that need to be completed are the budget information. There are a number of these tabs to accommodate large proposals. *Project Name: Re-enter the proposal name (Maximum Character Limit: 150 characters)
Advanced Metering Infrastructure
Implementing Organization: Leave blank
Secondary Implementing Organization: Leave blank
Proposed Start Date: Leave blank
Proposed End Date: Leave blank
Scope of Work: Leave blank
Project Description: Leave blank
Project Objective: Leave blank
PROJECT BENEFITS INFORMATION
Please do not enter any information into GRanTS for the following Project Benefits Questions. They are standard GRanTS questions and cannot be removed but are unnecessary for implementation grant applicants
Benefit Level: Leave blank.
Benefit Type: Leave blank.
Benefit: Leave blank.
Description: Leave blank.
Measurement: Leave blank.
PROJECT BUDGET
2022 Urban Community Drought Relief GL/PSP
Please do not enter any information into GRanTS for the following Project Budget Questions. They are standard GRanTS questions and cannot be removed but are unnecessary for implementation grant applicants.
Use the “Copy Budget data from Applicant Info” feature to populate previously entered data. The total project cost will auto calculate.
*GEOGRAPHIC INFORMATION
2022 Urban Community Drought Relief GL/PSP
Enter the geographical information for the proposal location (latitude and longitude in degrees, minutes, and seconds). Enter the County*.
*LEGISLATIVE INFORMATION
Use the “Copy Legislative data from Applicant Info” feature to populate previously entered data.
APPLICANT INFORMATION AND QUESTIONS TAB
The answers to these questions will be used in processing the proposal and determining eligibility and completeness.
*Self-Certification: By clicking on Yes on this question, the applicant certifies that all information included in this application is true and correct, and the applicant has made his/her best efforts to confirm the veracity of its contents as of the date of submission of this application.
PROJECT INFORMATION TAB
*Project Name: Provide enter the project name. 50
Advanced Metering Infrastructure
*Local Partner Sponsor: Please enter the local partner sponsor name. 50 Water System Public ID: 20 CA3610052
*Provide project map in a pdf format: Maximum file size is 2GB. Please be sure to include the Underrepresented Community/Tribe area and benefits if claiming a benefit.
*How many households will benefit from this project? 11
37,000
*Please briefly describe the proposed project: 1500
The City of Victorville Water District (VWD) serves 134,810 residents (37,000 meter connections) with potable water primarily from groundwater sources. This project will finalize a long-term Advanced Metering Infrastructure (AMI) project giving VWD hourly data updates on all meters and conserving up to 10% of system-wide supply characterized as 2200 acre-feet-per-year (AFY). Currently, meter data is read meter by meter monthly via vehicle capture. However, in the face of increasing drought, this lagging rate of data collection fails to capture extreme usage, leaks and backflow, and even water theft. Additionally, customers have no ability to track their own usage and make behavior changes. To remedy this, over the last seven years VWD has undertaken extensive feasibility planning and meter upgrades including register replacement with AMI devices. However, the system lacks the final pieces to unlock all usage data for both VWD and its customers: “gateway” fixed network data collectors, software installation/training, and a customer engagement portal. In this case, gateways will be positioned throughout the community, providing linkage between the AMI meters and the ultimate software collection system at VWD headquarters. The customer engagement portal with the same hourly usage information collected by the gateways. Project will be completed within three-year grant timespan and supported by an extensive multi-language outreach/education campaign performed by existing staff.
*Grant Amount Requested: Enter the amount of funds being requested for the project. 64
2022 Urban Community Drought Relief GL/PSP
$1,500,000
*Other Cost Share: Enter the amount of any other cost share for the project. 1000
This project seeks a cost share waiver on the grounds that more than 51% of project benefits serve an Underrepresented Community (URC)/Disadvantaged Community (DAC). This project serves the entire Victorville service area providing greater than 51% of benefits directly to DAC residents. DAC classification is assigned to communities whose Median Household Income (MHI) is less than 80% of the Statewide MHI of $62,938. Victorville’s 6
th Cycle Housing Element verifies that jurisdiction MHI is only $55,025- clearly below the state threshold. Further, the U.S. Census Bureau’s American Community Survey specifies that 18.8% of Victorville residents are below the National Poverty Line and considered Severely DAC (SDAC). Further, out of a 5-point rating system, CalEnviroScreen assigns Victorville a 2.5 level Pollution Burden with high-risk triggers (such as drought) for low-income residents. The attached map details geographic DAC status and system-wide benefits within VWD boundary lines.
*GEOGRAPHIC INFORMATION
Geographic Information: Enter the geographical information for the project location (latitude and longitude in degrees, minutes, and seconds).
County: Enter the County*. 10
San Bernadino County
PROJECT LEVEL EVALUATION
Does this project respond to an existing emergency to humans and/or wildlife? If so, please answer the three questions below.
How does this project address a current water supply shortage which significantly endangers the public health, safety or welfare of a specific community or region? 1500
Without much precipitation, Victorville Water District (VWD) relies heavily on the groundwater pumping of its 34 active wells. However, 50% of those wells do not meet State or Federal water quality requirements and VWD needs available potable supplies for mixing or dilution to meet standards for human consumption. A shortage of supply exacerbates poor water quality with potential to significantly endanger public health. Drought in Victorville also means a loss of all moisture types including a striking 63% decrease in fog frequency. Without the fog, Victorville’s impervious surface temperatures increased contributing to a ‘Heat Island Effect’. This Heat Island Effect amplifies potentially deadly heat waves evidenced by Victorville’s copious ‘Excessive Heat Advisories’.
Prolonged drought also translates into drier soil conditions increasing both dust particulates and ‘Valley Fever’ fungal spore release during high wind events such as the annual Santa Ana winds. In fact, San Bernadino County saw a 377% increase of ‘Valley Fever’ fungal infections during the drought years. Drought also intensifies regional wildfires which have steadily increased to claim over 2,100 hectares annually. As a result, wildfire smoke adds to Victorville’s overall public health stressors caused by drought. In short, drought-driven water supply shortages have proven to significantly endanger Victorville public health making water conservation projects like this key to mitigating further impacts.
How does this project address a current water quality emergency which significantly endangers the public health, safety or welfare of a specific community or region? 1500
2022 Urban Community Drought Relief GL/PSP
Water quality is always an issue for the Victorville Water District (VWD) with underground water sources continually testing high for naturally occurring, but potentially dangerous chemicals.
Considering that Victorville relies on groundwater capture and pumping for approximately 85% of its total water service, water quality during drought is a serious concern. In fact, Victorville operates a total of 34 active wells, 50% of which do not meet state or federal drinking quality standards for arsenic, nitrates, iron, manganese, and Chromium-VI during regular rainfall years. During drought years, those numbers are concentrated and Victorville must maintain quality by importing additional water for mixing, dilution, and processing. For the VWD, imported water comes from the State Water Project (SWP) which is notorious for its own quality issues testing high for sodium and selenium. As a result, water quality issues for Victorville are compounded. Case in point, during the drought, Victorville was forced to import 35% more water than usual to ensure safe drinkable status and prevent serious danger to public health. However, to best avoid utilizing imported water of dubious quality, the VWD must rely on intensive water conservation projects such as this Turf Replacement Rebate. This project will save an additional 2200 AFY of potable supply, providing the VWD with exactly the quality needed to deliver safe drinking water and prevent public health dangers exacerbated by drought
How does this project address a current water supply shortage or water quality emergency which significantly endangers a species of concern or a species listed on either the California or Federal Endangered Species Acts?1500
Within the Victorville Water District (VWD) service area, four species catalogued on the California Endangered Species Act list are impacted by a water supply shortage. For all species, water shortages translate into a loss of available feedstock and an increase of habitat loss due to wildfire. In particular, the California Red-Legged Frog and Desert Tortoise rely on available groundwater to time their exoduses from hibernation and cues to breed. Without enough water, those cues are missed, breeding slows, and species fall into deeper threat.
For the Least Bells Vireo and Southwestern Willow Flycatcher birds, drought increases the likelihood that not enough feedstock will be available resulting in generational losses and tapering of genetic biodiversity. Combined with increased wildfires driven by exceptionally dry drought conditions, all species are under significant danger.
*Briefly describe how the community/area benefiting from this project is being impacted by the current drought. 1500
With only 1.5-3.4 inches of rainfall during a regular year, the Victorville Water District (VWD) depends on the strength of its groundwater supply and regional basin to provide clean water for residents.
Drought forces an increased reliance on groundwater supplies which become stressed without rainfall recharge. The VWD 2020 Urban Water Management Plan (UWMP) outlines how VWD “considers it a high priority to maintain stability in previously over-drafted groundwater basins and reduce overdraft in groundwater basins experiencing ongoing water table declines. Overdraft is considered a challenge for reliability not only in quantity of supply but also quality.” Drought has forced the VWD to increase its imported supply by 35% from the ‘interruptible’ State Water Project (SWP) which negatively impacts financially sensitive DAC ratepayers. Besides supply shortages, the UWMP warns of quality concerns, “Decreased recharge (due to drought) and increased groundwater pumping may allow concentrations of groundwater contaminants such as arsenic, nitrates, hexavalent chromium (Chromium VI) and Total Dissolved Solids (TDS) to increase in local basins.” Above ground, California’s 4
th Climate Change Assessment highlights how “low precipitation years coincide with warm years” culminating in a 63% reduction in fog frequency. With drought, the loss of these low 2022 Urban Community Drought Relief GL/PSP
clouds disrupt the surface radiation balance generating a higher ‘Heat Island Effect’ with potentially deadly impacts on its residents
*How will this project alleviate the drought impacts described above? 1500
The Victorville Water District 2020 Urban Water Management Plan (UWMP) cites the key sources of system-wide water loss to be leaks from water lines or unauthorized use/theft of water. The UWMP points out how “a significant number of leaks remain undetected over long periods of time” contributes to overall system-wide water loss. For VWD, the UWMP cited that the “average 2016-2019 water loss was 10% of production. The 2020 water loss is estimated to be 6% of total water use.” Hourly data communicated through the software installation and customer engagement portal resolves water loss for both VWD and its customers with a swift usage alert system to detect leaks, theft, or extreme usage. Based on feasibility study data, once fully operational, system-wide conservation is estimated at 10%- or 2200 AFY- which means that prior production losses are practically negated. As a result, this project alleviates the drought impacts related to available quantity. With adequate supply, VWD can also better control its drinkable quality preventing negative impacts to human health. All of which points to a reduction in groundwater pumping and the prevention of groundwater overdraft. More underground supply translates into available moisture for groundwater basin soils supporting regional ecosystem health.
*Please describe why state funding is needed for this project. If state funding is not secured, what will happen to the project? 1000
Victorville Water District is very sensitive to changes in supply or quality. With just 1.5-3.4 inches of precipitation during a normal year, drought conditions take what little water is normally available and force the VWD to rely on poor quality pumped groundwater and volatile imported supplies instead.
Without State funding, this project would likely face uncertain delays which could be costly in terms of operational efficiency and ratepayer impacts. It would also limit the amount of water savings as time is of the essence for a water system like Victorville’s. Without this swift State funding, financially sensitive ratepayers would likely be negatively impacted. Considering that the entire service area is classified a Disadvantaged Community (DAC) with 18.8% below the National Poverty Line and Severely DAC, every dollar and every drop saved is crucial.
*Can the applicant utilize a partial award if one should be made available? What would the minimum funding needed be to complete the project as proposed? 1000
A partial award for this project could result in project delays. Money requested is in alignment with specific hardware and software purchases/upgrades which would complete this project. VWD can accept a partial award and would scale activities accordingly, however would prefer full requested amount to swiftly achieve objectives with minimal delays.
Please note the GRanTS system cannot accommodate the full drop-down menu for benefit types in one 2022 Urban Community Drought Relief GL/PSP
menu. Please select only ONE answer from the three dropdowns for primary benefit and ONE answer for secondary benefit.
*Primary Benefit Value: Please quantify the level of enter the quantity of the benefit the project would provide
2200
*Primary Benefit Type: Please select the primary benefit type of the project
Reduced Groundwater Pumping
*Primary Benefit Unit: Please select the benefit unit.
AFY
Secondary Benefit Value: Please quantify the level benefit the project would provide
Secondary Benefit Type: Please select the secondary benefit type of the project Secondary Benefit Unit: Please select the benefit unit. *Description: Please briefly describe how the project will achieve the claimed benefits including how the project benefits an Urban Community. Please include the name of the Urban Community this project benefits. Please include in the explanation information on the timespan of the primary project benefit and how the project will adapt to ensure a public benefit under future climate conditions 1500
The City of Victorville is listed as an ‘Urban Community’ by its 2020 Urban Water Management Plan and serviced by the Victorville Water District. This Advanced Metering Infrastructure (AMI) project achieves the claimed benefit of Reduced Groundwater Pumping by swiftly detecting leaks and providing customers with an alert system for heavy usage via the online ‘customer engagement portal’. All of which prevents water being wasted and creates long term conservation behaviors. The 2200 AFY of anticipated water savings translates to a system-wide conservation of 10% which likewise means 10% less groundwater being pumped at the source- thereby achieving the primary benefit of Reduced Groundwater Pumping. Timespan of project benefits is the life of the equipment. In this case “gateway” fixed network data controller boxes installed at key junctures throughout the service area. Each controller can handle several thousand connections and devices are expected to last for 20 years. To continue project benefits under future climate conditions, VWD will anticipate updating the boxes at the end of their useful life. The software and customer engagement portal website have no strict timelines for upgrade but VWD will plan on successive upgrades as needed indefinitely, thereby cementing future
benefit for climate conditions.
Does the project provide a benefit(s) to an Underrepresented Community ? : Select yes or no.
Yes
What percentage of project benefit will go to an Underrepresented Community? Provide a numeric percentage of the project benefits that go to a DAC and/or EDA.6
51%
If the project provides a benefit to an Underrepresented Community please describe the benefit, the percentage of project benefit and justification for the benefit level, and how the area meets the definitions of an Underrepresented Community.1500
2022 Urban Community Drought Relief GL/PSP
Primary project benefits of Reduced Groundwater Pumping reach the entire Victorville Water District (VWD) system and all customers. In alignment with the City of Victorville’s 6th Cycle Housing Element, the entire VWD geographic service area is classified as a Disadvantaged Community (DAC). DAC levels are measured using Statewide Median Household Income (MHI) with the expectation that a DAC must fall below 80% of the Statewide MHI. For California, Statewide MHI is $62,938 and Victorville is clearly below that at $55,025 and therefore understood to be a DAC. Furthermore, the U.S. Census Bureau’s America Community Survey highlights that 18.8% of the Victorville population falls below the National Poverty Line indicating a Severely DAC (SDAC) status. This project results in increased potable water system-wide providing benefits to all community members indicating that more than 50% of benefits reach DAC households. Additionally, whenever Victorville is faced with a production shortage and lack of groundwater recharge, it must purchase increasingly expensive imported water from the State Water Project. Ultimately, the purchase of these supplies is passed down to ratepayers- of whom Victorville has an overwhelming majority. Project benefits prevent the purchase of imported water affecting the entire community considered a DAC/SDAC. Please see attached map for geographical representation of project benefits.
Does the project provide a benefit(s) to a Tribe?: Select yes or no.
N/A
What percentage of the project benefit will go to a Tribe? : Provide a numeric percentage of the project benefits to a Tribe. 64
N/A
If the project provides a benefit to a Tribe please include the name of the Tribe, the percentage of project benefits directly benefitting the Tribe, and justification for the benefit level. 1000
N/A
Please describe the specific climate change vulnerabilities that will impact the Urban Water Management Plan area. Applicants must cite a reference document which identifies the local area vulnerability (eg. UWMP, climate change analysis, local IRWM, etc.) 1500
The Victorville Water District’s (VWD) 2020 Urban Water Management Plan (UWMP) identifies the local area vulnerabilities as Higher Temperatures, Heat Waves, and Water Supply Uncertainty. Overall, this looks like a loss of environmental moisture- including low clouds and fog- translating to more surface radiation and dangerous Heat Island Effects. California’s 4th Climate Change Assessment (CCA) reveals that “certain populations are more vulnerable to extreme heat. These include low-income communities which often experience a greater urban heat island effect due to lack of…vegetation and which have lower access to air conditioning.” The CCA also outlines how “extreme heat and drought decrease soil moisture and increase plant mortality, factors that contribute to larger wildfires and poorer air quality.” In fact, regional wildfires doubled in size during the 2000s growing to more than 2,100 hectares per year causing air quality problems for humans and habitat destruction for already endangered species. Besides dangerous heat and poor air quality, climate change will impact public health through increased fungal lung infections from ‘Valley Fever’. Here again the CCA illustrates how “drought conditions exacerbated by climate change may contribute to higher dust levels, and consequently to increased risk for Valley Fever.” With climate change, Victorville is facing an 80% chance of decadal drought and a 4-5 degree increase by mid-century. 2022 Urban Community Drought Relief GL/PSP
Please describe how the project will mitigate the vulnerabilities described in the previous question.1500
For the Victorville Water District (VWD), the key to mitigating climate change and drought impacts will be increased availability of potable water, the reduction of Heat Island Effects, and less groundwater pumping thereby increasing overall soil moisture and preserving habitats. VWD’s Urban Water Management Plan (UWMP) advocates for specific actions to combat climate change impacts such as “conducting water efficiency and demand reduction programs”. This project fulfills the edicts of the UWMP by creating a demand reduction program that conserves up to 10% of production supply or 2200 AFY. This water savings will help prevent VWD from purchasing volatile imported water supplies and shore up water quality of existing supplies to help with mixing, diluting and processing. With this additional supply conserved, VWD will be less reliant on groundwater pumping thereby leaving more moisture in the soil contributing to habitat health and slowing the release of dry soil fungal spores that cause ‘Valley Fever’. As the climate continues to warm for VWD, the positive impacts of doing this conservation project will compound year after year helping boost overall climate resiliency.
*Is land acquisition or landowner permission required for this project? If so, please briefly describe the status of the acquisition or agreement with the landowner. If the acquisition is not complete or permission not secured at the time of application, please describe the plan to complete it. 1000
Land acquisition is not part of this project and all activities take place either on land owned by the VWD or on properties with existing right of way.
*Has planning for this project been completed? Please describe the status of planning and tasks needed for the project. 1000
All planning for this project has been completed. Early feasibility studies and information gathering was completed years ago with installation progress nearly complete. This project requires no further planning tasks and represents the completion of a long-running work in progress.
*Has design for this project been completed? Please describe the status of design and tasks needed for the project. 1000
No design activities required for this project.
*Are the CEQA (and NEPA if applicable) processes for this project complete? Please briefly describe the CEQA (or NEPA) documents for this project. 1000
No CEQA or NEPA required for this project.
*Is permitting for this project complete? Please briefly describe the permits necessary to complete this project. 1000
No permitting needed to complete this project.
2022 Urban Community Drought Relief GL/PSP
*Please describe the necessary activities related to construction/implementation for this project. 1000
This project will install 45 “gateway” fixed network data collection boxes on existing poles/structures.
Each box will be strategically placed within a service area capturing hourly data from hundreds of connections each. Simultaneously, the Victorville Water District will upload and train on AMI/AMR software receiving hourly usage data from “gateway” collection boxes. VWD will also establish a “customer engagement portal” available to all users offering the same hourly data uploads. Considering this is the last phase of the total AMI project, VWD will perform all tasks with existing staff or pre- established vendors. This project will also be supported by an extensive multi-language education/outreach campaign alerting customers to the new customer engagement portal and teaching them how to use it. Success will be measured by overall system water savings and an annual customer survey to validate decrease in water usage in alignment with grant scope of work.
2022 Urban Community Drought Relief GL/PSP
Grant Application Form
The following outlines the required questions included in the application form for reference. Applicants must complete the application form via GRanTS to be considered for this grant opportunity. The following table outlines the required application questions as they will appear in the GRanTS system with instructions on how to answer each question.
APPLICANT INFORMATION TAB
The following information is general and applies to the applicant and the overall proposal. Specific project information should be detailed in the project tab provided in the GRanTS application. Required questions are marked with an *.
APPLICANT INFORMATION
*Organization Name: Provide the name of the Agency/Organization responsible for submitting the application. Should the application be successful, this Agency/Organization will be the Grantee.
Victorville Water District
*Point of Contact:
Doug Mathews, [email protected] 760-243-6332, Public Works and Water, 14343 Civic Drive, Victorville, CA, and 92393
*Point of Contact Position Title: This should be the day-to-day manager for the application 50 Director of Public Works & Water
*Proposal Name: Please enter Urban Drought 2022<Applicant Name> Proposal. (Maximum Character Limit:150) Urban Drought 2022<Victorville Water District>Proposal *Proposal Objective: Please briefly describe the proposal. 2000
The City of Victorville Water District (VWD) proposes the use of Turf Replacement Rebates, Ultra-High Efficient Toilet Installations, and Advanced Metering Infrastructure (AMI) to save 2,325 acre-feet per year (AFY) of precious potable water. The entire VWD service area is classified as an Underrepresented Community (URC)/Disadvantaged Community (DAC) with a high Severely DAC (SDAC) ratio. With 134,810 citizens and 37,000 meter connections, Victorville is frequently described as a ‘bedroom community’ providing the low-income workforce to nearby Los Angeles. The City occupies a portion of California’s Inland Desert region with very low annual precipitation annually making it very sensitive to drought conditions. To provide enough water for its ratepayers, VWD relies heavily on groundwater pumping from 34 active wells and imported water from the State Water Project (SWP) delivered via their watermaster, the Mojave Water Agency (MWA). However, groundwater quality has proven challenging with high levels of arsenic, nitrates, iron, manganese, and Chromium-VI. Imported water presents its own quality problems as supply from the SWP is testing increasingly high in selenium and sodium. Improving water quality requires having enough potable water available for mixing and diluting, made all the more challenging by drought conditions. The three projects embedded in this proposal- Turf Replacement, UHE Toilets, and AMI – are designed to comprehensively lower consumption and reduce groundwater pumping by conserving 2,325 AFY of potable water. The additional water will prevent VWD from importing increasingly expensive water and ensuring it has enough water available to provide safe, drinkable quality water. Each project will be supported by a multi-language outreach campaign and VWD anticipated completing all milestones within grant timeframe. Proposal success will be measured via conservation levels and annual customer surveys. 2022 Urban Community Drought Relief GL/PSP
PROPOSAL BUDGET
For the proposal, the following budget items should be transferred from the Proposal Summary Form where applicable.
Other Contribution: Leave Blank; Information is requested later in the application Local Contribution: Leave Blank; Information is requested later in the application Federal Contribution: Leave Blank; Information is requested later in the application In-kind Contribution: Leave Blank; Information is requested later in the application
*Amount Requested (Grant Funds Requested): Provide the amount of total grant funds requested.
$5,675,000
Total Proposal Cost: Total proposal cost is automatically calculated based on the contribution amounts entered above.
GEOGRAPHIC INFORMATION
GRanTS requests latitude and longitude in degrees, minutes, and seconds. You may use converters on the web such as https://www.fcc.gov/media/radio/dms-decimal. *Latitude: 34.510860
*Longitude: -117.323990
*Longitude/Latitude Clarification: Only use if necessary. (Maximum Character Limit: 250) Location: Leave Blank
2022 Urban Community Drought Relief GL/PSP
*County(ies): Provide the county in which the project is located. If the project covers multiple counties hold the control key down and select all that apply.
San Bernadino County
Groundwater Basins: Leave Blank
Hydrologic Regions: Leave Blank
Watershed(s): Leave Blank
*LEGISLATIVE INFORMATION
Enter the State Assembly, State Senate, and U.S. Congressional Districts in which the project is located (use district numbers only, not the name of the Legislator). For projects that include more than one district, Hold the control key down and select all that apply.
State Assembly (District 39) State Senate (District 21) U.S. Congressional (District 23rd)
PROJECTS TAB
The Project tab is required by GRanTS and cannot be deleted. The Projects Tab should not be used for your application but rather filled in with data as indicated below. Please utilize the appropriate Project Information tab for Project 1, 2, 3, etc. of your proposal. For grant admin, the only fields that need to be completed are the budget information. There are a number of these tabs to accommodate large proposals. *Project Name: Turf Replacement Rebate
Implementing Organization: Leave blank
Secondary Implementing Organization: Leave blank
Proposed Start Date: Leave blank
Proposed End Date: Leave blank
Scope of Work: Leave blank
Project Description: Leave blank
Project Objective: Leave blank
PROJECT BENEFITS INFORMATION
Please do not enter any information into GRanTS for the following Project Benefits Questions. They are standard GRanTS questions and cannot be removed but are unnecessary for implementation grant applicants
Benefit Level: Leave blank.
Benefit Type: Leave blank.
Benefit: Leave blank.
Description: Leave blank.
Measurement: Leave blank.
PROJECT BUDGET
2022 Urban Community Drought Relief GL/PSP
Please do not enter any information into GRanTS for the following Project Budget Questions. They are standard GRanTS questions and cannot be removed but are unnecessary for implementation grant applicants.
Use the “Copy Budget data from Applicant Info” feature to populate previously entered data. The total project cost will auto calculate.
*GEOGRAPHIC INFORMATION
2022 Urban Community Drought Relief GL/PSP
Enter the geographical information for the proposal location (latitude and longitude in degrees, minutes, and seconds). Enter the County*.
*LEGISLATIVE INFORMATION
Use the “Copy Legislative data from Applicant Info” feature to populate previously entered data.
APPLICANT INFORMATION AND QUESTIONS TAB
The answers to these questions will be used in processing the proposal and determining eligibility and completeness.
*Self-Certification: By clicking on Yes on this question, the applicant certifies that all information included in this application is true and correct, and the applicant has made his/her best efforts to confirm the veracity of its contents as of the date of submission of this application.
Yes
PROJECT INFORMATION TAB
*Project Name: VWD Turf Replacement Rebate
*Local Partner Sponsor: Please enter the local partner sponsor name. 50 Water System Public ID: 20 CA3610052
*Provide project map in a pdf format: Maximum file size is 2GB. Please be sure to include the Underrepresented Community/Tribe area and benefits if claiming a benefit.
*How many households will benefit from this project?
2500
*Please briefly describe the proposed project: 1500
The Victorville Water District (VWD) Turf Replacement Rebate project will build on an existing regional “Cash for Grass” effort to remove an additional 1.7 million square feet of non-functional turf for both residents and Commercial, Industrial, & Institutional (CII) customers. Square footage replaced in relationship to this project helps fulfil the 2022 ‘California Water Supply Strategy’ edict 3.1 to replace a total 500 million square feet of non-functional turf. With its low annual precipitation, Victorville relies heavily on the water conservation efforts of its residents. Based on data from the Mojave Water Agency’s (MWA) similar rebate program, this project anticipates saving approximately 5,083 gallons per household annually and reaching a total of 2,500 households which translates to a cumulative conservation of 39 AFY of potable water. Overall, the project will be supported by a multi-language education/outreach campaign and all project management will be performed by existing staff.
Outreach
efforts will include the development of online videos, information on social media, direct mail pieces, water bill inserts, and more. The project will provide a $2/square foot rebate to customers replacing ornamental turf with staff executing both a pre- and post-installation inspection to validate both square
footage and design. VWD is an established grants manager capable of meeting all grant milestones and completing project within the three-year grant timespan.
*Grant Amount Requested: Enter the amount of funds being requested for the project. 64
$3,500,000
2022 Urban Community Drought Relief GL/PSP
*Other Cost Share: Enter the amount of any other cost share for the project. 1000
This project seeks a cost share waiver on the grounds that more than 51% of project benefits serve an Underrepresented Community (URC)/Disadvantaged Community (DAC). Water conservation strategies such as this Turf Replacement Project provide system-wide benefits to the entire community. DAC classification is assigned to communities whose Median Household Income (MHI) is less than 80% of the Statewide MHI of $62,938. Victorville’s 6
th Cycle Housing Element verifies that jurisdiction MHI is only $55,025- clearly below the state threshold. Further, the U.S. Census Bureau’s American Community Survey specifies that 18.8% of Victorville residents are below the National Poverty Line and considered Severely DAC (SDAC). Further, out of a 5-point rating system, CalEnviroScreen assigns Victorville a 2.5 level Pollution Burden with high-risk triggers (such as drought) for low-income residents. The attached map details geographic DAC status and system-wide benefits within VWD boundary lines *GEOGRAPHIC INFORMATION
Geographic Information: Enter the geographical information for the project location (latitude and longitude in degrees, minutes, and seconds).
County: Enter the County*.
San Bernadino
PROJECT LEVEL EVALUATION
Does this project respond to an existing emergency to humans and/or wildlife? If so, please answer the three questions below.
How does this project address a current water supply shortage which significantly endangers the public health, safety or welfare of a specific community or region? 1500
Without much precipitation, Victorville Water District (VWD) relies heavily on the groundwater pumping of its 34 active wells. However, 50% of those wells do not meet State or Federal water quality requirements and the City needs available potable supplies for mixing or dilution to meet standards for human consumption. A shortage of supply exacerbates poor water quality with potential to significantly endanger public health. Drought in Victorville also means a loss of all moisture types including a striking 63% decrease in fog frequency. Without the fog, Victorville’s impervious surface temperatures increased contributing to a ‘Heat Island Effect’. This Heat Island Effect amplifies potentially deadly heat waves evidenced by Victorville’s copious excessive heat advisories. Prolonged drought also translates into drier soil conditions increasing both dust particulates and ‘Valley Fever’ fungal spore release during high wind events such as the annual Santa Ana winds. In fact, San Bernadino County saw a 377% increase of ‘Valley Fever’ fungal infections during the drought years.
Drought also intensifies regional wildfires which have steadily increased to claim over 2,100 hectares annually. As a result, wildfire smoke adds to Victorville’s overall public health stressors caused by drought. In short, drought-driven water supply shortages have proven to significantly endanger Victorville public health making water conservation projects like this key to mitigating further impacts.
How does this project address a current water quality emergency which significantly endangers the public health, safety or welfare of a specific community or region? 1500
Water quality is always an issue for the Victorville Water District (VWD) with underground water sources continually testing high for naturally occurring, but potentially dangerous chemicals.
Considering that Victorville relies on groundwater capture and pumping for approximately 85% of its total water service, water quality during drought is a serious concern. In fact, Victorville operates a total
of 34 active wells, 50% of which do not meet state or federal drinking quality standards for arsenic, nitrates, iron, manganese, and Chromium-VI during regular rainfall years. During drought years, those 2022 Urban Community Drought Relief GL/PSP
numbers are concentrated and Victorville must maintain quality by importing additional water for mixing, dilution, and processing. For the VWD, imported water comes from the State Water Project (SWP) which is notorious for its own quality issues testing high for sodium and selenium. As a result, water quality issues for Victorville are compounded. Case in point, during the drought, Victorville was forced to import 35% more water than usual to ensure safe drinkable status and prevent serious danger to public health. However, to best avoid utilizing imported water of dubious quality, the VWD must rely on intensive water conservation projects such as this Turf Replacement Rebate. This project will save an additional 39 AFY of potable supply, providing the VWD with exactly the quality needed to deliver safe drinking water and prevent public health dangers exacerbated by drought.
How does this project address a current water supply shortage or water quality emergency which significantly endangers a species of concern or a species listed on either the California or Federal Endangered Species Acts?1500
Within the Victorville Water District (VWD) service area, four species catalogued on the California Endangered Species Act list are impacted by a water supply shortage. For all species, water shortages translate into a loss of available feedstock and an increase of habitat loss due to wildfire. In particular, the California Red-Legged Frog and Desert Tortoise rely on available groundwater to time their exoduses from hibernation and cues to breed. Without enough water, those cues are missed, breeding slows, and species
fall into deeper threat. For the Least Bells Vireo and Southwestern Willow Flycatcher birds, drought increases the likelihood that not enough feedstock will be available resulting in generational losses and tapering of genetic biodiversity. Combined with increased wildfires driven by exceptionally dry drought conditions, all species are under significant danger.
*Briefly describe how the community/area benefiting from this project is being impacted by the current drought. 1500
With only 1.5-3.4 inches of rainfall during a regular year, the Victorville Water District (VWD) depends on the strength of its groundwater supply and regional basin to provide clean water for residents.
Drought forces an increased reliance on groundwater supplies which become stressed without rainfall recharge. The VWD 2020 Urban Water Management Plan (UWMP) outlines how VWD “considers it a high priority to maintain stability in previously over-drafted groundwater basins and reduce overdraft in groundwater basins experiencing ongoing water table declines. Overdraft is considered a challenge for reliability not only in quantity of supply but also quality.” Drought has forced the VWD to increase its imported supply by 35% from the ‘interruptible’ State Water Project (SWP) which negatively impacts financially sensitive DAC ratepayers. Besides supply shortages, the UWMP warns of quality concerns, “Decreased recharge (due to drought) and increased groundwater pumping may allow concentrations of groundwater contaminants such as arsenic, nitrates, hexavalent chromium (Chromium VI) and Total Dissolved Solids (TDS) to increase in local basins.” Above ground, California’s 4th Climate Change Assessment highlights how “low precipitation years coincide with warm years” culminating in a 63% reduction in fog frequency. With drought, the loss of these low clouds disrupt the surface radiation balance generating a higher ‘Heat Island Effect’ with potentially deadly impacts on its residents.
*How will this project alleviate the drought impacts described above? 1500
2022 Urban Community Drought Relief GL/PSP
For the Victorville Water District (VWD), the answer to alleviating drought impacts is to conserve more potable water. More specifically, the UWMP calls out water-wise landscaping as a tool to combat drought impacts indicating that “hotter and drier weather may lead to an increased demand in landscape irrigation, especially during the spring and fall months, increasing pressure on water supplies that may have availability restrictions”. This conservation project will save a total of 39 AFY of potable water serving 2,500 households and replacing approximately 1.7 million square feet of ornamental turf.
Successful water conservation depends on customer willingness and permanent behavior change. This Turf Replacement Rebate program provides $2/square foot of available rebate proven to encourage installation of water-wise landscaping. Once installed, program guidelines stipulate that the landscape changes are permanent. VWD is building this rebate project on a previously successful ‘Cash for Grass’ program and has experience performing both pre- and post-installation inspections to verify square footage and plant selection. Overall, the project will help alleviate drought impacts with a multi- language education and outreach campaign intended to further teach customers about conservation through Turf Replacement. Saving 39 AFY will help VWD retain needed potable water to secure both supply and quality in the face of challenging drought conditions.
*Please describe why state funding is needed for this project. If state funding is not secured, what will happen to the project? 1000
Victorville Water District is very sensitive to changes in supply or quality. With just 1.5-3.4 inches of precipitation during a normal year, drought conditions take what little water is normally available and force the VWD to rely on poor quality pumped groundwater and volatile imported supplies instead.
Without State funding, this project would likely face uncertain delays which could be costly in terms of operational efficiency and ratepayer impacts. It would also limit the amount of water savings as time is of the essence for a water system like Victorville’s. Without swift State funding, financially sensitive ratepayers would likely be negatively impacted. Considering that the entire service area is considered a Disadvantaged Community (DAC) with 18.8% below the National Poverty Line and classified as Severely DAC, every dollar and every drop saved because of this conservation project is crucial.
*Can the applicant utilize a partial award if one should be made available? What would the minimum funding needed be to complete the project as proposed? 1000
If needed, Victorville Water District would accept a partial award and scale activities to fit available funding. No minimum funding specified.
Please note the GRanTS system cannot accommodate the full drop-down menu for benefit types in one 2022 Urban Community Drought Relief GL/PSP
menu. Please select only ONE answer from the three dropdowns for primary benefit and ONE answer for secondary benefit.
*Primary Benefit Value: Please quantify the level of enter the quantity of the benefit the project would provide
39 *Primary Benefit Type: Please select the primary benefit type of the project
Reduced Groundwater Pumping
*Primary Benefit Unit: Please select the benefit unit.
Acre Feet/Year
Secondary Benefit Value: Please quantify the level benefit the project would provide
Secondary Benefit Type: Please select the secondary benefit type of the project Secondary Benefit Unit: Please select the benefit unit. *Description: Please briefly describe how the project will achieve the claimed benefits including how the project benefits an Urban Community. Please include the name of the Urban Community this project benefits. Please include in the explanation information on the timespan of the primary project benefit and how the project will adapt to ensure a public benefit under future climate conditions 1500
The City of Victorville is classified as an ‘Urban Community’ by its 2020 Urban Water Management Plan and serviced by the Victorville Water District. This Turf Replacement Rebate project achieves the claimed benefit of Reduced Groundwater Pumping by lessening the groundwater water sourced for non-functional turf. It is generally understood that ornamental turf (lawn) is a water-intensive feature.
Victorville relies on Groundwater pumping for about 85% of its water gathered from 34 active wells.
Replacing ornamental turf with water-wise landscaping is estimated to conserve an annual 39 AFY, preventing it from being pumped in the first place- thereby achieving the primary benefit of Reduced Groundwater Pumping. Regarding anticipated timespan of project benefits, program guidelines stipulate that any Turf Replacement be permanent indicating that the timespan of the project benefits is
also permanent. In the context of future climate conditions, the best mitigation strategy is an increase of available water. Considering that this project permanently saves 39 AFY, it automatically continues to benefit the public with additional available water regardless of climate status.
Does the project provide a benefit(s) to an Underrepresented Community ? : Select yes or no.
Yes
What percentage of project benefit will go to an Underrepresented Community? Provide a numeric percentage of the project benefits that go to a DAC and/or EDA.6
51%
2022 Urban Community Drought Relief GL/PSP
If the project provides a benefit to an Underrepresented Community please describe the benefit, the percentage of project benefit and justification for the benefit level, and how the area meets the definitions of an Underrepresented Community.1500
Primary project benefits of water conservation reach the entire Victorville Water District (VWD) system and all customers. In alignment with the City of Victorville’s 6th Cycle Housing Element, the entire VWD geographic service area is classified as a Disadvantaged Community (DAC). DAC levels are measured using Statewide Median Household Income (MHI) with the expectation that a DAC must fall below 80% of the Statewide MHI. For California, Statewide MHI is $62,938 and Victorville is clearly below that with a $55,025 and therefore understood to be a DAC. Furthermore, the U.S. Census Bureau’s America Community Survey highlights that 18.8% of the Victorville population falls below the National Poverty Line indicating a Severely DAC status. CalEnviroScreen places San Bernadino County among the counties with the highest air pollution and gives it an overall 2.5 Pollution Burden rating on a 5-point scale indicating an “area of increasing risk”. As a result, more than 51% of primary benefits will reach DAC customers throughout the geographic VWD service area receiving benefits from this project.
Does the project provide a benefit(s) to a Tribe?: Select yes or no.
No
What percentage of the project benefit will go to a Tribe? : Provide a numeric percentage of the project benefits to a Tribe. 64
If the project provides a benefit to a Tribe please include the name of the Tribe, the percentage of project benefits directly benefitting the Tribe, and justification for the benefit level. 1000
No perceived tribal benefits
Please describe the specific climate change vulnerabilities that will impact the Urban Water Management Plan area. Applicants must cite a reference document which identifies the local area vulnerability (eg. UWMP, climate change analysis, local IRWM, etc.) 1500
The Victorville Water District’s (VWD) 2020 Urban Water Management Plan (UWMP) identifies the local area vulnerabilities as Higher Temperatures, Heat Waves, and Water Supply Uncertainty. Overall, this looks like a loss of environmental moisture- including low clouds and fog- translating to more surface radiation and dangerous Heat Island Effects. California’s 4th Climate Change Assessment (CCA) reveals that “certain populations are more vulnerable to extreme heat. These include low-income communities which often experience a greater urban heat island effect due to lack of…vegetation and which have lower access to air conditioning.” The CCA also outlines how “extreme heat and drought decrease soil moisture and increase plant mortality, factors that contribute to larger wildfires and poorer air quality.” In fact, regional wildfires doubled in size during the 2000s growing to more than 2,100 hectares per year causing air quality problems for humans and habitat destruction for already endangered species. Besides dangerous heat and poor air quality, climate change will impact public health through increased fungal lung infections from ‘Valley Fever’. Here again the CCA illustrates how “drought conditions exacerbated by climate change may contribute to higher dust levels, and consequently to increased risk for Valley Fever.” With climate change, Victorville is facing an 80% chance of decadal drought and a 4-5 degree increase by mid-century. 2022 Urban Community Drought Relief GL/PSP
Please describe how the project will mitigate the vulnerabilities described in the previous question.150
For the Victorville Water District (VWD), the key to mitigating climate change and drought impacts will be increased availability of potable water, the reduction of Heat Island Effects, and less groundwater pumping thereby increasing overall soil moisture and preserving habitats. VWD’s Urban Water Management Plan (UWMP) advocates for specific actions to combat climate change impacts such as “conducting water efficiency and demand reduction programs”. This project fulfills the edicts of the UWMP by creating a demand reduction program that replaces ornamental turf for 1.7 million square feet throughout the VWD service area. The project will result in turf replacement for 2,500 households and save a cumulative 39 AFY of potable water. This water savings will help prevent VWD from purchasing volatile imported water supplies and shore up water quality of existing supplies to help with mixing, diluting and processing. With this additional supply conserved, VWD will be less reliant on groundwater pumping thereby leaving more moisture in the soil contributing to habitat health and slowing the release of dry soil fungal spores that cause ‘Valley Fever’. As the climate continues to warm for VWD, the positive impacts of doing this conservation project will compound year after year helping boost overall climate resiliency.
*Is land acquisition or landowner permission required for this project? If so, please briefly describe the status of the acquisition or agreement with the landowner. If the acquisition is not complete or permission not secured at the time of application, please describe the plan to complete it. 1000
No land acquisition is needed for this project. All turf replacement activities take place on private property at the instigation of the landowner.
*Has planning for this project been completed? Please describe the status of planning and tasks needed for the project. 1000
No extended planning for this project is required. The project builds on a previously successful ‘Cash for Grass’ program and has existing program guidelines and water-wise plants list. Project activities will be carried out existing VWD Conservation Division Staff including one (1) supervisor and two (2) specialists.
*Has design for this project been completed? Please describe the status of design and tasks needed for the project. 1000
No design required for project success. Any specific landscape design requested or desired by the landowner is the responsibility of the landowner subject to pre- and post-installation inspection by VWD.
*Are the CEQA (and NEPA if applicable) processes for this project complete? Please briefly describe the CEQA (or NEPA) documents for this project. 1000
No CEQA or NEPA activities required for this project.
2022 Urban Community Drought Relief GL/PSP
*Is permitting for this project complete? Please briefly describe the permits necessary to complete this project. 1000
No permitting required for project success. Any specific permitting required by landowner is sole responsibility of landowner and subject to pre- and post-installation inspection by VWD.
*Please describe the necessary activities related to construction/implementation for this project. 1000
Victorville Water District (VWD) will implement all tasks assigned to this project utilizing existing staff.
The multi-lingual outreach/education campaign will be accomplished with print, web, email, and in- person tactics performed by existing staff of the VWD Conservation Division staff including one (1) supervisor and two (2) specialists. Application review for pre- and post-Turf Replacement rebate work will likewise be performed by existing staff. Victorville has an existing Water-Wise Plants List is has built to include successful low-water use vegetation and will use this list to guide the customer review process. To measure success of the entire project, staff will collate water use data and collect survey data measuring outcomes against stated project goals.
2022 Urban Community Drought Relief GL/PSP
Grant Application Form
The following outlines the required questions included in the application form for reference. Applicants must complete the application form via GRanTS to be considered for this grant opportunity. The following table outlines the required application questions as they will appear in the GRanTS system with instructions on how to answer each question.
APPLICANT INFORMATION TAB
The following information is general and applies to the applicant and the overall proposal. Specific project information should be detailed in the project tab provided in the GRanTS application. Required questions are marked with an *.
APPLICANT INFORMATION
*Organization Name: Provide the name of the Agency/Organization responsible for submitting the application. Should the application be successful, this Agency/Organization will be the Grantee.
Victorville Water District
*Point of Contact:
Doug Mathews, [email protected] 760-243-6332, Public Works and Water, 14343 Civic Drive, Victorville, CA, and 92393
*Point of Contact Position Title: This should be the day-to-day manager for the application 50 Director of Public Works & Water
*Proposal Name: Please enter Urban Drought 2022<Applicant Name> Proposal. (Maximum Character Limit:150)
Urban Drought 2022<Victorville Water District>Proposal
*Proposal Objective: Please briefly describe the proposal. 2000
The City of Victorville Water District (VWD) proposes the use of Turf Replacement Rebates, Ultra-High Efficient Toilet Installations, and Advanced Metering Infrastructure (AMI) to save 2,325 acre-feet per year (AFY) of precious potable water. The entire VWD service area is classified as an Underrepresented Community (URC)/Disadvantaged Community (DAC) with a high Severely DAC (SDAC) ratio. With 134,810 citizens and 37,000 meter connections, Victorville is frequently described as a ‘bedroom community’ providing the low-income workforce to nearby Los Angeles. The City occupies a portion of California’s Inland Desert region with very low annual precipitation annually making it very sensitive to drought conditions. To provide enough water for its ratepayers, VWD relies heavily on groundwater pumping from 34 active wells and imported water from the State Water Project (SWP) delivered via their watermaster, the Mojave Water Agency (MWA). However, groundwater quality has proven challenging with high levels of arsenic, nitrates, iron, manganese, and Chromium-VI. Imported water presents its own quality problems as supply from the SWP is testing increasingly high in selenium and sodium. Improving water quality requires having enough potable water available for mixing and diluting, made all the more challenging by drought conditions. The three projects embedded in this proposal- Turf Replacement, UHE Toilets, and AMI – are designed to comprehensively lower consumption and reduce groundwater pumping by conserving 2,325 AFY of potable water. The additional water will prevent VWD from importing increasingly expensive water and ensuring it has 2022 Urban Community Drought Relief GL/PSP
enough water available to provide safe, drinkable quality water. Each project will be supported by a multi-language outreach campaign and VWD anticipated completing all milestones within grant timeframe. Proposal success will be measured via conservation levels and annual customer surveys.
PROPOSAL BUDGET
For the proposal, the following budget items should be transferred from the Proposal Summary Form where applicable.
Other Contribution: Leave Blank; Information is requested later in the application Local Contribution: Leave Blank; Information is requested later in the application Federal Contribution: Leave Blank; Information is requested later in the application In-kind Contribution: Leave Blank; Information is requested later in the application
*Amount Requested (Grant Funds Requested): Provide the amount of total grant funds requested. $5,675,000
Total Proposal Cost: Total proposal cost is automatically calculated based on the contribution amounts entered above.
GEOGRAPHIC INFORMATION
GRanTS requests latitude and longitude in degrees, minutes, and seconds. You may use converters on the web such as https://www.fcc.gov/media/radio/dms-decimal. *Latitude: 34.510860
*Longitude: -117.323990
*Longitude/Latitude Clarification: Only use if necessary. (Maximum Character Limit: 250) Location: Leave Blank
2022 Urban Community Drought Relief GL/PSP
*County(ies): Provide the county in which the project is located. If the project covers multiple counties hold the control key down and select all that apply.
San Bernadino County
Groundwater Basins: Leave Blank
Hydrologic Regions: Leave Blank
Watershed(s): Leave Blank
*LEGISLATIVE INFORMATION
Enter the State Assembly, State Senate, and U.S. Congressional Districts in which the project is located (use district numbers only, not the name of the Legislator). For projects that include more than one district, Hold the control key down and select all that apply.
State Assembly (District 39) State Senate (District 21) U.S. Congressional (District 23rd)
PROJECTS TAB
The Project tab is required by GRanTS and cannot be deleted. The Projects Tab should not be used for your application but rather filled in with data as indicated below. Please utilize the appropriate Project Information tab for Project 1, 2, 3, etc. of your proposal. For grant admin, the only fields that need to be completed are the budget information. There are a number of these tabs to accommodate large proposals. *Project Name: Re-enter the proposal name (Maximum Character Limit: 150 characters) Urban Drought 2022<Victorville Water District>Proposal
Implementing Organization: Leave blank
Secondary Implementing Organization: Leave blank
Proposed Start Date: Leave blank
Proposed End Date: Leave blank
Scope of Work: Leave blank
Project Description: Leave blank
Project Objective: Leave blank
PROJECT BENEFITS INFORMATION
Please do not enter any information into GRanTS for the following Project Benefits Questions. They are standard GRanTS questions and cannot be removed but are unnecessary for implementation grant applicants
Benefit Level: Leave blank.
Benefit Type: Leave blank.
Benefit: Leave blank.
Description: Leave blank.
Measurement: Leave blank.
PROJECT BUDGET
2022 Urban Community Drought Relief GL/PSP
Please do not enter any information into GRanTS for the following Project Budget Questions. They are standard GRanTS questions and cannot be removed but are unnecessary for implementation grant applicants.
Use the “Copy Budget data from Applicant Info” feature to populate previously entered data. The total project cost will auto calculate.
*GEOGRAPHIC INFORMATION
2022 Urban Community Drought Relief GL/PSP
Enter the geographical information for the proposal location (latitude and longitude in degrees, minutes, and seconds). Enter the County*.
*LEGISLATIVE INFORMATION
Use the “Copy Legislative data from Applicant Info” feature to populate previously entered data.
APPLICANT INFORMATION AND QUESTIONS TAB
The answers to these questions will be used in processing the proposal and determining eligibility and completeness.
*Self-Certification: By clicking on Yes on this question, the applicant certifies that all information included in this application is true and correct, and the applicant has made his/her best efforts to confirm the veracity of its contents as of the date of submission of this application.
PROJECT INFORMATION TAB
*Project Name: Provide enter the project name. 50
Ultra-High Efficient Toilet Direct Installation Replacement
*Local Partner Sponsor: Please enter the local partner sponsor name. 50 Water System Public ID: 20 CA3610052
*Provide project map in a pdf format: Maximum file size is 2GB. Please be sure to include the Underrepresented Community/Tribe area and benefits if claiming a benefit.
*How many households will benefit from this project? 11
1000
*Please briefly describe the proposed project: 1500
The City of Victorville Water District (VWD) seeks to offer a fixture replacement incentive project targeting low-income Disadvantaged Community members with Ultra-High Efficient Toilet Direct Installation Replacement. Targeting 1000 low-income households, this project anticipates conserving 89 acre-feet-per- year (AFY) of potable supply. It also builds on a previously successful income qualified toilet replacement program enacted from 2016-2019. The previous program ended in 2020 due to Covid-19 and new state funding is needed for adequate restart. According to program data, the average toilet uses 3.0 gallons per flush. By contrast, these Ultra-High Efficient toilets use just 0.8 gallons per flush and are considered to be “high-efficiency water savers”. VWD anticipates expending all program funding throughout the three-year grant timespan. Often referred to as a ‘bedroom community’ providing the low-wage labor force for Los Angeles, the entire Victorville service area is considered a Disadvantaged Community (DAC) with an additional 18.8% falling below the National Poverty Line and classified as Severely DAC. At the same time, drought has forced VWD to purchase increasingly expensive imported water which, in turn, negatively impacts financially sensitive ratepayers. The solution is to conserve as much existing water supply as possible. This project prevents the waste of 89 AFY from toilet use and aids in preventing ratepayer impacts.
*Grant Amount Requested: Enter the amount of funds being requested for the project. 64 $675,000
2022 Urban Community Drought Relief GL/PSP
*Other Cost Share: Enter the amount of any other cost share for the project. 1000
This project seeks a cost share waiver on the grounds that more than 51% of project benefits serve an Underrepresented Community (URC)/Disadvantaged Community (DAC). This project strictly targets low-income households offering direct install of high-water efficiency Ultra-High Efficient toilets. DAC classification is assigned to communities whose Median Household Income (MHI) is less than 80% of the Statewide MHI of $62,938. Victorville’s 6
th Cycle Housing Element verifies that jurisdiction MHI is only $55,025- clearly below the state threshold. Further, the U.S. Census Bureau’s American Community Survey specifies that 18.8% of Victorville residents are below the National Poverty Line and considered Severely DAC (SDAC). Further, out of a 5-point rating system, CalEnviroScreen assigns Victorville a 2.5 level Pollution Burden with high-risk triggers (such as drought) for low-income residents. The attached map details geographic DAC status and system-wide benefits within VWD boundary lines.
*GEOGRAPHIC INFORMATION
Geographic Information: Enter the geographical information for the project location (latitude and longitude in degrees, minutes, and seconds).
County: Enter the County*. 10
San Bernadino County
PROJECT LEVEL EVALUATION
Does this project respond to an existing emergency to humans and/or wildlife? If so, please answer the three questions below.
How does this project address a current water supply shortage which significantly endangers the public health, safety or welfare of a specific community or region? 1500
Without much precipitation, Victorville Water District (VWD) relies heavily on the groundwater pumping of its 34 active wells. However, 50% of those wells do not meet State or Federal water quality requirements and VWD needs available potable supplies for mixing or dilution to meet standards for human consumption. A shortage of supply exacerbates poor water quality with potential to significantly endanger public health. Drought in Victorville also means a loss of all moisture types including a striking 63% decrease in fog frequency. Without the fog, Victorville’s impervious surface temperatures increased contributing to a ‘Heat Island Effect’. This Heat Island Effect amplifies potentially deadly heat waves evidenced by Victorville’s copious ‘Excessive Heat Advisories’.
Prolonged drought also translates into drier soil conditions increasing both dust particulates and ‘Valley Fever’ fungal spore release during high wind events such as the annual Santa Ana winds. In fact, San Bernadino County saw a 377% increase of ‘Valley Fever’ fungal infections during the drought years. Drought also intensifies regional wildfires which have steadily increased to claim over 2,100 hectares annually. As a result, wildfire smoke adds to Victorville’s overall public health stressors caused by drought. In short, drought-driven water supply shortages have proven to significantly endanger Victorville public health making water conservation projects like this key to mitigating further impacts.
How does this project address a current water quality emergency which significantly endangers the public health, safety or welfare of a specific community or region? 1500
Water quality is always an issue for the Victorville Water District (VWD) with underground water sources continually testing high for naturally occurring, but potentially dangerous chemicals.
Considering that Victorville relies on groundwater capture and pumping for approximately 85% of its total water service, water quality during drought is a serious concern. In fact, Victorville operates a total 2022 Urban Community Drought Relief GL/PSP
of 34 active wells, 50% of which do not meet state or federal drinking quality standards for arsenic, nitrates, iron, manganese, and Chromium-VI during regular rainfall years. During drought years, those numbers are concentrated and Victorville must maintain quality by importing additional water for mixing, dilution, and processing. For the VWD, imported water comes from the State Water Project (SWP) which is notorious for its own quality issues testing high for sodium and selenium. As a result, water quality issues for Victorville are compounded. Case in point, during the drought, Victorville was forced to import 35% more water than usual to ensure safe drinkable status and prevent serious danger to public health. However, to best avoid utilizing imported water of dubious quality, the VWD must rely on intensive water conservation projects such as this Turf Replacement Rebate. This project will save an additional 89 AFY of potable supply, providing the VWD with exactly the quality needed to deliver safe drinking water and prevent public health dangers exacerbated by drought.
How does this project address a current water supply shortage or water quality emergency which significantly endangers a species of concern or a species listed on either the California or Federal Endangered Species Acts?1500
Within the Victorville Water District (VWD) service area, four species catalogued on the California Endangered Species Act list are impacted by a water supply shortage. For all species, water shortages translate into a loss of available feedstock and an increase of habitat loss due to wildfire. In particular, the California Red-Legged Frog and Desert Tortoise rely on available groundwater to time their exoduses from hibernation and cues to breed. Without enough water, those cues are missed, breeding slows, and species fall into deeper threat.
For the Least Bells Vireo and Southwestern Willow Flycatcher birds, drought increases the likelihood that not enough feedstock will be available resulting in generational losses and tapering of genetic biodiversity. Combined with increased wildfires driven by exceptionally dry drought conditions, all species are under significant danger.
*Briefly describe how the community/area benefiting from this project is being impacted by the current drought. 1500
With only 1.5-3.4 inches of rainfall during a regular year, the Victorville Water District (VWD) depends on the strength of its groundwater supply and regional basin to provide clean water for residents.
Drought forces an increased reliance on groundwater supplies which become stressed without rainfall recharge. The VWD 2020 Urban Water Management Plan (UWMP) outlines how VWD “considers it a high priority to maintain stability in previously over-drafted groundwater basins and reduce overdraft in groundwater basins experiencing ongoing water table declines. Overdraft is considered a challenge for reliability not only in quantity of supply but also quality.” Drought has forced the VWD to increase its imported supply by 35% from the ‘interruptible’ State Water Project (SWP) which negatively impacts financially sensitive DAC ratepayers. Besides supply shortages, the UWMP warns of quality concerns, “Decreased recharge (due to drought) and increased groundwater pumping may allow concentrations of groundwater contaminants such as arsenic, nitrates, hexavalent chromium (Chromium VI) and Total Dissolved Solids (TDS) to increase in local basins.” Above ground, California’s 4
th Climate Change Assessment highlights how “low precipitation years coincide with warm years” culminating in a 63% reduction in fog frequency. With drought, the loss of these low clouds disrupt the surface radiation balance generating a higher ‘Heat Island Effect’ with potentially deadly impacts on its residents.
*How will this project alleviate the drought impacts described above? 1500 2022 Urban Community Drought Relief GL/PSP
For the Victorville Water District (VWD), the answer to alleviating drought impacts is to conserve more potable water. By mid-century, the VWD Urban Water Management Plan anticipates that compounding droughts will result in regulated use to just 50 Gallons Per Capita Day (GPCD). If an average toilet flushes 3.0 gallons per use, then the usage quickly adds up and enforcing usage will be challenging. At just 0.8 gallons per flush, this project alleviates drought impacts by substantially cutting toilet water use, thereby ‘freeing up’ potable water for use throughout the system and lessening overall drought impact. For Victorville, more water isn’t simply about quantity. The additional 89 AFY of potable water conserved by this project aids VWD in treating the naturally poorer quality pulled via groundwater pumping. Additional water supply created by this project helps with the mixing, dilution and processing needed to ensure drinkable quality- especially during drought years when extra water for such activities is lean.
*Please describe why state funding is needed for this project. If state funding is not secured, what will happen to the project? 1000
Victorville Water District is very sensitive to changes in supply or quality. With just 1.5-3.4 inches of precipitation during a normal year, drought conditions take what little water is normally available and force the VWD to rely on poorer quality pumped groundwater and volatile imported supplies instead.
Without State funding, this project would likely face uncertain delays which could be costly in terms of operational efficiency and ratepayer impacts. Without this swift State funding, financially sensitive ratepayers would likely be negatively impacted and delays represent water lost that could have been otherwise conserved. Considering that the entire service area is classified a Disadvantaged Community (DAC) with 18.8% below the National Poverty Line and Severely DAC, every dollar and every drop saved is crucial.
*Can the applicant utilize a partial award if one should be made available? What would the minimum funding needed be to complete the project as proposed? 1000
If needed, Victorville Water District would accept a partial award and scale activities to fit available funding. No minimum funding specified.
Please note the GRanTS system cannot accommodate the full drop-down menu for benefit types in one 2022 Urban Community Drought Relief GL/PSP
menu. Please select only ONE answer from the three dropdowns for primary benefit and ONE answer for secondary benefit.
*Primary Benefit Value: Please quantify the level of enter the quantity of the benefit the project would provide
89 *Primary Benefit Type: Please select the primary benefit type of the project
Reduced Groundwater Pumping
*Primary Benefit Unit: Please select the benefit unit.
Acre Feet/Year
Secondary Benefit Value: Please quantify the level benefit the project would provide
Secondary Benefit Type: Please select the secondary benefit type of the project Secondary Benefit Unit: Please select the benefit unit. *Description: Please briefly describe how the project will achieve the claimed benefits including how the project benefits an Urban Community. Please include the name of the Urban Community this project benefits. Please include in the explanation information on the timespan of the primary project benefit and how the project will adapt to ensure a public benefit under future climate conditions 1500
The City of Victorville is listed as an ‘Urban Community’ by its 2020 Urban Water Management Plan and serviced by the Victorville Water District. This Ultra-High Efficient Toilet Direct Installation Replacement project achieves the claimed benefit of Reduced Groundwater Pumping by lessening the groundwater water sourced for daily flushing. The average toilet wastes approximately 3.0 gallons per flush while Ultra-High Efficient toilets flush at just 0.8 gallons- less than half. Currently, Victorville relies on Groundwater pumping for about 85% of its water gathered from 34 active wells. Replacing toilets for 1000 income-qualified households will prevent 89 AFY from being pumped in the first place- thereby achieving the primary benefit of Reduced Groundwater Pumping. Timespan of project benefits is the life of the toilets; collectively recognized as 50 years by the plumbing industry. In the context of future climate conditions, the best mitigation strategy for Victorville is an increase of available groundwater. This project makes 89 AFY available for the next few decades conferring additional protections in the face of an uncertain climate future.
Does the project provide a benefit(s) to an Underrepresented Community ? : Select yes or no.
Yes
What percentage of project benefit will go to an Underrepresented Community? Provide a numeric percentage of the project benefits that go to a DAC and/or EDA.6
100
If the project provides a benefit to an Underrepresented Community please describe the benefit, the percentage of project benefit and justification for the benefit level, and how the area meets the definitions of an Underrepresented Community.1500
Primary project benefits of Reduced Groundwater Pumping reach the entire Victorville Water District (VWD) system and all customers. In alignment with the City of Victorville’s 6th Cycle Housing Element, the entire VWD geographic service area is classified as a Disadvantaged Community (DAC). DAC levels 2022 Urban Community Drought Relief GL/PSP
are measured using Statewide Median Household Income (MHI) with the expectation that a DAC must fall below 80% of the Statewide MHI. For California, Statewide MHI is $62,938 and Victorville is clearly below that with a $55,025 and therefore understood to be a DAC. Furthermore, the U.S. Census Bureau’s America Community Survey highlights that 18.8% of the Victorville population falls below the National Poverty Line indicating a Severely DAC status. Because this particular project focuses on providing direct installation of Ultra-High Efficient toilets to income qualified residents, a low-income ratepayer is likely to see their monthly water bill go down proving dual benefit of project- money and water savings.
Reduced Groundwater Pumping benefits the entire DAC service area, and toilet installation directly benefits income-qualified residents.
Does the project provide a benefit(s) to a Tribe?: Select yes or no.
What percentage of the project benefit will go to a Tribe? : Provide a numeric percentage of the project benefits to a Tribe. 64
If the project provides a benefit to a Tribe please include the name of the Tribe, the percentage of project benefits directly benefitting the Tribe, and justification for the benefit level. 1000
N/A
Please describe the specific climate change vulnerabilities that will impact the Urban Water Management Plan area. Applicants must cite a reference document which identifies the local area vulnerability (eg. UWMP, climate change analysis, local IRWM, etc.) 1500
The Victorville Water District’s (VWD) 2020 Urban Water Management Plan (UWMP) identifies the local area vulnerabilities as Higher Temperatures, Heat Waves, and Water Supply Uncertainty. Overall, this looks like a loss of environmental moisture- including low clouds and fog- translating to more surface radiation and dangerous Heat Island Effects. California’s 4 th Climate Change Assessment (CCA)
reveals that “certain populations are more vulnerable to extreme heat. These include low-income communities which often experience a greater urban heat island effect due to lack of…vegetation and which have lower access to air conditioning.” The CCA also outlines how “extreme heat and drought decrease soil moisture and increase plant mortality, factors that contribute to larger wildfires and poorer air quality.” In fact, regional wildfires doubled in size during the 2000s growing to more than 2,100 hectares per year causing air quality problems for humans and habitat destruction for already endangered species. Besides dangerous heat and poor air quality, climate change will impact public health through increased fungal lung infections from ‘Valley Fever’. Here again the CCA illustrates how “drought conditions exacerbated by climate change may contribute to higher dust levels, and consequently to increased risk for Valley Fever.” With climate change, Victorville is facing an 80% chance of decadal drought and a 4-5 degree increase by mid-century.
Please describe how the project will mitigate the vulnerabilities described in the previous question.1500
For the Victorville Water District (VWD), the key to mitigating climate change and drought impacts will be increased availability of potable water, the reduction of Heat Island Effects, and less groundwater pumping thereby increasing overall soil moisture and preserving habitats. VWD’s Urban Water Management Plan (UWMP) advocates for specific actions to combat climate change impacts such as 2022 Urban Community Drought Relief GL/PSP
“conducting water efficiency and demand reduction programs”. This project fulfills the edicts of the UWMP by creating a demand reduction program that replaces 1000 toilets for income-qualified residents lowering their collective water use for flushing by 89 AFY. This water savings will help prevent VWD from purchasing volatile imported water supplies and shore up water quality of existing supplies to help with mixing, diluting and processing. With this additional supply conserved, VWD will be less reliant on groundwater pumping thereby leaving more moisture in the soil contributing to habitat health and slowing the release of dry soil fungal spores that cause ‘Valley Fever’. As the climate continues to warm for VWD, the positive impacts of doing this conservation project will compound year after year helping boost overall climate resiliency.
*Is land acquisition or landowner permission required for this project? If so, please briefly describe the status of the acquisition or agreement with the landowner. If the acquisition is not complete or permission not secured at the time of application, please describe the plan to complete it. 1000
Land acquisition is not part of this project. All activities take place at the instigation of the customer and occur on their facilities. No specific permissions are needed except access and permission to entry for replacement appointment.
*Has planning for this project been completed? Please describe the status of planning and tasks needed for the project. 1000
No planning activities required for this project.
*Has design for this project been completed? Please describe the status of design and tasks needed for the project. 1000
No design tasks associated with this project.
*Are the CEQA (and NEPA if applicable) processes for this project complete? Please briefly describe the CEQA (or NEPA) documents for this project. 1000
No CEQA/NEPA required for this project.
*Is permitting for this project complete? Please briefly describe the permits necessary to complete this project. 1000
No permitting tasks required for this project.
*Please describe the necessary activities related to construction/implementation for this project. 1000
The City of Victorville Water District (VWD) has successfully implemented this project since 2016 until it was closed due to Covid-19 in 2019. State funds are required to restart program. All administrative activities will be performed by existing VWD Conservation Division staff including one (1) Conservation Supervisor and two (2) Conservation Specialists. Direct installation will be performed by a vendor selected through a competitive bid process. Income qualified applicants will be targeted via a multi- language education/outreach campaign utilizing direct mail, website access, social media, video content, water bill inserts and more. Applicants will be required to fill out the requisite applications and waivers before staff schedules them for a replacement appointment. Post installation success will be measured via 2022 Urban Community Drought Relief GL/PSP
usage data and customer surveys.
Item Number: 20
City Council / Board of Directors
Written Communications
Meeting of: February 21, 2023
Submitted By:
C. Eric Ray, Airport Director
Subject:
Grant of Easement on the Southern California Logistics Airport Recommendation:
That the Southern California Logistics Airport Authority (“SCLAA”) Board of Directors:
(1) grant a utility easement on Southern California Logistics Airport Authority property to Southern California Edison across the parcel designated as APN 0459-192-58; and
(2) authorize the Airport Director to execute said instrument.
Fiscal Impact:
There is no fiscal impact associated with this item.
Strategic Plan Goal:
Goal E. Invest in Infrastructure
Background:
Governed by the Southern California Logistics Airport Authority (“SCLAA”), the Southern California Logistics Airport (“SCLA”) is located on the former George Air Force Base (“GAFB”), operating to redevelop the GAFB for reuse by the community so as to minimize the financial impact on the community caused by the base closure. Many new and expanding businesses have been established over the years since the SCLAA began the redevelopment process, some utilizing existing buildings and infrastructure and others constructing new. When buildings are constructed or modified, the utility infrastructure supporting and/or surrounding new construction periodically needs to be upgraded or modified. As a result, utility companies need to obtain the right to use and access specific areas on the property owned by the SCLAA for the purpose of installing, modifying, and maintaining their respective infrastructure. This right to use and access a specific area is referred to as a utility easement.
5 7
0 Victorville Municipal Utility Services (“VMUS”) currently offers electrical service for commercial and industrial customers at the SCLA. With the continued growth experienced at the SCLA, VMUS is expanding its substation to meet the growing demands of the SCLA tenants. This construction is designed to upgrade the electrical infrastructure serving the SCLA tenants so that VMUS can continue to provide safe and reliable and power.
Discussion:
In 2020, VMUS requested a study from Southern California Edison (“SCE”) to increase capacity to the VMUS SCLA distribution system. The result of this study required SCE to install additional interconnection facilities and extend a second 35kv sub-transmission line to the VMUS substation. This new 35kv circuit will run alongside the existing 35kv circuit to bring the additional system capacity VMUS requires to serve its growing customer base at the SCLA.
Staff recommends that Your Honorable Southern California Logistics Airport Authority Board of Directors approve the attached Grant of Easement in support of the expansion and improvement of business activities located at the SCLA.
Staff remains available for any questions or comments you may have.
CER/lf
Attachments: A. General Site Map
B. Grant of Easement for APN 0459-192-58
ATTACHMENT A
GENERAL SITE MAP
APN 0459-192-58Easement
ATTACHMENT B
GRANT OF EASEMENT
FOR APN 0459-192-58
RECORDING REQUESTED BY
WHEN RECORDED MAIL TO
SOUTHERN CALIFORNIA EDISON COMPANY
2 INNOVATION WAY, 2nd FLOOR
POMONA, CA 91768
Attn: Title and Real Estate Services
Mail Tax Statements to: N/A
SPACE ABOVE THIS LINE FOR RECORDER’S USE
SCE Doc. No.
GRANT OF
EASEMENT
DOCUMENTARY TRANSFER TAX $ NONE
VALUE AND CONSIDERATION LESS THAN $100.00)
DISTRICT
Victorville
SERVICE ORDER
TD2035289
SERIAL NO.
MAP SIZE
_____________________ SCE Company
SIG. OF DECLARANT OR AGENT DETERMINING TAX FIRM NAME FIM MU -6626 -G
APN 0459-192-58
APPROVED:
VEGETATION &
LAND
MANAGEMENT
BY
SLS/BT
DATE
01/25/2023
SOUTHERN CALIFORNIA LOGISTICS AIRPORT AUTHORITY, a joint -powers authority under the Laws of the State of California , (hereinafter referred to as “Grantor”), hereby grants to SOUTHERN CALIFORNIA EDISON CO MPANY, a corporation, its successors and assigns (hereinafter referred to as “Grantee”), an easement and right of way to construct, us e, maintain, operate, alter, add to, repair, replace, reconstruct, inspect and remove at any time and from time to time overhead electrical supply systems and communication systems (hereinafter referred to as “systems”), consisting of poles, guy wires and anchors, crossarms, wires and other appurtenant fixtures and/or equipment necessary or useful, for distributing electrical energy and for transmitting intelligence , data and/or communications (eg. through fiber optic cable) , in, on, over, along and across that certain real property in the County of San Bernardino, State of California, described as follows:
VARIOUS STRIPS OF LAND LYING WITHIN THOSE PORTIONS OF SECTION 26, TOWNSHIP 6 NORTH, RANGE 5 WEST, SAN BERNARDINO BASE AND MERIDIAN, SAID PORTIONS ARE MORE PARTICULARLY DESCRIBED AS PARCEL D -1 IN THE DEED TO THE GRANTOR HEREIN, RECORDED ON FEBRUARY 28, 2002 AS DOCUMENT NO. 2002-0095318, OF OFFICIAL RECORDS, AND DESCRIBED IN EXHIBIT “Y” OF LOT LINE ADJUSTMENT, RECORDED ON OCTOBER 04, 2006 AS DOCUMENT NO. 2006 -0677391, OF OFFICIAL
RECORDS, BOTH IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, THE CENTERLINES OF SAID STRIPS ARE DESCRIBED AS FOLLOWS:
STRIP #1 (20.00 FEET WIDE)
BEGINNING AT THE INTERSECTION OF THE NORTHERLY LINE OF INNOVATION, WITH A LINE PARALLEL WITH AND DISTANT 10.00 FEET WESTERLY, MEASURED AT RIGHT ANGLES, FROM THAT CERTAIN COURSE IN THE EASTERLY LINE OF SAID PARCEL D-1, DESCRIBED AS “SOUTH 00°22’27” WEST 1768.24 FEET” IN SAID DEED , AS SAID INTERSECTION IS SHOWN ON PARCEL MAP NO. 18985, AS PER MAP FILED IN BOOK 236, PAGES 55 THROUGH 62 OF PARCEL MAPS, IN THE OFFICE OF SAID COUNTY RECORDER; THENCE ALONG S AID PARALLEL LINE, NORTH 00°22’27” EAST 740.57 FEET TO A POINT HEREINAFTER REFERRED TO AS POINT “A”; THENCE NORTH 88°54’34” EAST 252.24 FEET; THENCE NORTH 88°59’28” EAST 58.88 FEET; THENCE SOUTH 89°54’36” EAST 59.06 FEET TO A POINT HEREINAFTER REFERRED TO AS POINT “B”; THENCE NORTH 00°05’24” EAST 208.89 FEET; THENCE NORTH 01°23’35” WEST 209.07 FEET; THENCE NORTH 00°47’09” WEST 230.59 FEET; THENCE NORTH 00°19’26” WEST 166.98 FEET TO A POINT HEREINAFTER REFERRED TO AS POINT “C”; THENCE SOUTH 89°12’08” WEST 63.53 FEET TO A POINT HEREINAFTER REFERRED TO AS POINT “D”; THENCE NORTH 00°05’24” EAST 42.64 FEET; THENCE NORTH 00°48’36” WEST 43.99 FEET; THENCE NORTH 00°05’24” EAST
85.00 FEET TO A POINT OF ENDING.
THE SIDELINES OF SAID STRIP ARE TO BE PROLONGED OR SHORT ENED TO TERMINATE SOUTHERLY IN THE NORTHERLY LINE OF SAID INNOVATION AND TO JOIN AT THE ANGLE POINTS.
2 DSE802244960
TD2035289
STRIP #2 (20.00 FEET WIDE)
BEGINNING AT SAID POINT “A”; THENCE SOUTH 88°54’34” WEST 30.00 FEET TO A POINT OF ENDING.
EXCEPTING THEREFROM THAT PORTION INCLUDED WITHIN STRIP #1 DESCRIBED HEREINABOVE.
STRIP #3 (20.00 FEET WIDE)
BEGINNING AT SAID POINT “A”; THENCE NORTH 00°22’27” EAST 30.00 FEET TO A POINT OF ENDING.
EXCEPTING THEREFROM THAT PORTION INCLUDED WITHIN STRIP #1 DESCRIBED HEREINABOVE.
STRIP #4 (20.00 FEET WIDE)
BEGINNING AT SAID POINT “B”; THENCE SOUTH 00°05’24” WEST 29.62 FEET, MORE OR LESS, TO A POINT OF ENDING IN THE SOUTHERLY LINE OF SAID LAND DESCRIBED IN EXHIBIT “Y” OF LOT LINE ADJUSTMENT, RECORDED ON OCTOBER 04, 2006 AS DOCUMENT NO. 2 006-0677391, OF OFFICIAL RECORDS, IN THE OFFICE OF SAID COUNTY RECORDER.
THE SIDELINES OF SAID STRIP ARE TO BE PROLONGED OR SHORTENED TO TERMINATE SOUTHERLY IN SAID SOUTHERLY LINE.
EXCEPTING THEREFROM THAT PORTION INCLUDED WITHIN STRIP #1 DESCRIBED HERE INABOVE.
STRIP #5 (20.00 FEET WIDE)
BEGINNING AT SAID POINT “B”; THENCE SOUTH 89°54’36” EAST 30.00 FEET TO A POINT OF ENDING.
EXCEPTING THEREFROM THAT PORTION INCLUDED WITHIN STRIP #1 DESCRIBED HEREINABOVE.
STRIP #6 (20.00 FEET WIDE)
BEGINNING AT SAID POINT “C”; THENCE NORTH 00°19’26” WEST 30.00 FEET TO A POINT OF ENDING.
EXCEPTING THEREFROM THAT PORTION INCLUDED WITHIN STRIP #1 DESCRIBED HEREINABOVE.
STRIP #7 (20.00 FEET WIDE)
BEGINNING AT SAID POINT “D”; THENCE SOUTH 00°05’24” WEST 31.00 FEET T O A POINT OF ENDING.
EXCEPTING THEREFROM THAT PORTION INCLUDED WITHIN STRIP #1 DESCRIBED HEREINABOVE.
It is understood and agreed that the above description is approximate only, it being the intention of the Grantor(s) to grant an easement for said sys tems as constructed. The centerline of the easement shall be coincidental with the centerline of said systems as constructed in, on, over, under, across, and along the Grantor(s) property.
This legal description was prepared pursuant to Sec. 8730(c) of the Business & Professions Code.
Grantor further grants, bargains, sells and conveys unto the Grantee the right of assignment, in whole or in part, to others, without limitation, and the right to apportion or divide in whatever manner Grantee deems desira ble, any one or more, or all, of the easements and rights, including but not limited to all rights of access and ingress and egress granted to the Grantee by this Grant of Easement.
3 DSE802244960
TD2035289
Grantor hereby also grants to Grantee, its successors and assigns, and it s and their contractors, agents and employees, the right of free access to said systems and every part thereof, at all times, for the purpose of exercising the rights herein gr anted, and the right to clear and to keep clear the above described real propert y, free from explosives, buildings, equipment, brush, combustible material and any and all other obstructions of any kind, and the right to trim or remove any tree or shrub which, in the opinion of Grantee, may endanger said systems, or any part thereof, or interfere with the exercise of the rights herein granted.
EXECUTED this
_____ day of _______________________, 20____.
GRANTOR
SOUTHERN CALIFORNIA LOGISTICS AIRPORT
AUTHORITY, a joint-powers authority under the Laws
of the State of California
____________________________________
Signature
____________________________________
Print Name
____________________________________
Title
A Notary Public or other officer completing this certificate verifies only the identity of the individual who signe d the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California )
County of )
On _______________________ before me, , a Notary Public, personally appeared
, who proved to me on the basis of
satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature _______________________________ (Seal)
POR. SEC. 26,T 6 N, R 5 W, S.B.B&M.DESCRIBED AS PARCEL D-1PER DEED REC. 02/28/2002DOC. #2002-0095318, O.R.SAN BERNARDINO CO.
POR. SEC. 26, T 6 N, R 5 W, S.B.B&M.DESCRIBED IN EXHIBIT "Y" OFLOT LINE ADJUSTMENTREC. 10/04/2006 DOC. #2006-0677391, O.R.SAN BERNARDINO CO.N POR. SEC. 26, T 6 N, R 5 W, S.B.B&M.DESCRIBED IN EXHIBIT "Y" OFLOT LINE ADJUSTMENTREC. 10/04/2006 DOC. #2006-0677391, O.R.SAN BERNARDINO CO.N Item Number: 21
City Council / Board of Directors
Written Communications
Meeting of: February 21, 2023
Submitted By:
C. Eric Ray, Airport Director
Doug Mathews, Public Works and Water Director
Subject:
Purchase and Sale Agreement by and between the Southern California Logistics Airport Authority (SCLAA) and the Victorville Water District (VWD).
Recommendation:
That Your Honorable Southern California Logistics Airport Authority and Victorville Water District Board of Directors approve:
(1) Resolution No. SCLAA 23-001 approving the sale of a portion of Parcel J and authorizing the Executive Director to execute transactional documents to effectuate the sale and transfer of the property;
(2) Resolution No. VWD 23-003 approving the purchase of a portion of Parcel J and authorizing the General Manager to execute transactional documents to effectuate the purchase and transfer of the property; and
(3) Resolution No. SCLAA 23-002 amending the SCLAA annual budget for fiscal year 2022/2023 to recognize the sale proceeds.
Fiscal Impact:
The Purchase and Sale Agreement (“Agreement”) presented herein will generate $700,000 in revenue to the Southern California Logistics Airport and expend $700,000 as budgeted in the VWD Fund 4100020-55010-74467. The revenue associated with this Agreement increases the SCLAA’s budgeted revenue established for fiscal year 2022/2023 and thereby requires an additional revenue appropriation in the amount of $700,000 in the Off-Airport Fund 4520145-46100. Resolution No. SCLAA 23-002 is presented herein for the purpose of requesting approval of the required budget amendment as outlined below.
2 2
7 8
Current FY22/23 Budget
Revenue Expense
4520145-46100 Off-Airport Sale of Real/Personal Prop $28,574 $0 Revised FY22/23 Budget
Revenue Expense
4520145-46100 Off-Airport Sale of Real/Personal Prop $728,574 $0 Strategic Plan Goal:
Goal E. Invest in Infrastructure
Background:
In 2021, the City of Victorville caused the preparation of a Specific Plan update which covers the Southern California Logistics Airport (the “Airport”) property and establishes the requisite land use guidelines. The current Specific Plan recognizes the former Westwinds Golf Course (commonly referred to as “Parcel J”) as a commercially viable property that is best suited for industrial development. Parcel J was originally a part of the former George Air Force Base and was transferred to the SCLAA pursuant to an Economic Development Conveyance Agreement (EDC Agreement). The EDC Agreement is the same agreement that has allowed for the transfer of property pursuant to separate agreement to Stirling/Prologis which has already facilitated the development of 7.2 million square feet of industrial space.
Discussion:
On December 7, 2021, the Honorable Southern California Logistics Airport Authority Board of Directors approved the sale of 166.691 acres of Parcel J to Covington Investments, LLC. for a base price of $13.7M (approximately $1.88 per square foot) plus an additional $3.5M in commercial revenue participation to be paid at such time that development occurs. Concurrently, a small portion of Parcel J was preserved for a subsequent sale to the VWD to construct a second reclaimed water tank immediately adjacent to the existing water infrastructure. This 8.626-acre parcel is the subject of this contemplated Purchase and Sales Agreement, which sales price is based on the believed $1.88 per square foot market value.
In order to execute the sale to Covington Investments, the Surplus Land Act was addressed before the property closed escrow. Given that the U.S. Air Force deeded Parcel J to the Airport with specific deed restrictions prohibiting any residential uses on the property, the City Attorney provided a legal opinion as to the suitability of the sale.
Resolution No. SCLAA 21-017 (Attachment B) defined the legal opinion and provided the justification for the Board of Directors to declare Parcel J as Exempt Surplus Land in accordance with Government Code section 54221, subdivision (f)(1)(G) and is therefore not subject to the Surplus Lands Act. Subsequently, the California Department of Housing and Community Development declared the entire Parcel J as surplus and eligible for sale. This declaration includes the 8.626 acres contemplated for sale to the VWD. 2 2
7 8
Staff seeks the approval of the Southern California Logistics Airport Authority and the Victorville Water District Board of Directors of (1) Resolution No. SCLAA 23-001 approving the sale of a portion of Parcel J and authorizing the Executive Director to execute the transactional documents to effectuate the sale and transfer of the property; (2) Resolution #VWD 23-003 approving the purchase of a portion of Parcel J and authorizing the General Manager to execute transactional documents to effectuate the purchase and transfer of the property; and (3) Resolution #SCLAA 23-002 amending the SCLA annual budget for fiscal year 2022/2023 to recognize the sale proceeds.
Staff remains available for any questions or comments you may have.
CER/hdk
Attachments: A. Site Map
B. Resolution No. SCLAA 21-017
C. Resolution No. SCLAA 23-001
D. Resolution No. VWD 23-003
E. Purchase and Sale Agreement
F. Resolution No. SCLAA 23-002
ATTACHMENT A
SITE MAP
L
-
L>
āF
F
,B
ÂÂ
HU^
O
O
B PBB UBB B
L
ā I
? B ā
ā L
9
āā
ā
LO
B
W
ā?
M
ā
ā
Lā
āW!
ā
Â
U
?ā
W
I
āLLāāā
B
ā
āā
Y
$77$&+0(17$6,7(0$3
68%-(&76,7(
*(25*(%/9'
0217$1$67
ATTACHMENT B
RESOLUTION NO. SCLAA 21-017
ATTACHMENT C
RESOLUTION NO. SCLAA 23-001
1 SOUTHERN CALIFORNIA LOGISTICS AIRPORT AUTHORITY
RESOLUTION NO. SCLAA 23-001
A RESOLUTION OF THE SOUTHERN CALIFORNIA LOGISTICS
AIRPORT AUTHORITY APPROVING THE SALE OF CERTAIN
PROPERTY LOCATED AT SOUTHERN CALIFORNIA LOGISTICS
AIRPORT AND AUTHORIZING THE EXECUTIVE DIRECTOR TO
EXECUTE SUCH DOCUMENTS AS NECESSARY TO CONSUMMATE
SUCH SALE
WHEREAS, the Southern California Logistics Airport Authority (the "Authority") has been created pursuant to a certain joint exercise of powers agreement in accordance with California Government Code Section 6500, et seq.; and
WHEREAS, the Authority has deemed it desirable to sell certain property consisting of approximately 8.626 acres (the “ Property”) located at the Southern California Logistics Airport to the Victorville Water District; and
WHEREAS, the sale of the Property is to be consummated pursuant to the terms of a certain Purchase and Sale Agreement in substantially the form attached hereto as Exhibit “A” and incorporated herein by this reference (the “Purchase and Sale Agreement”); and
WHEREAS, the transaction contemplated hereby is a sale of property with deed restrictions which has previously been determined by the California Department of Housing and Community Development to be exempt surplus land pursuant to Government Code Section 54221(f)(1)(G) for the purposes of California Surplus Lands Act; and
WHEREAS, it is the intent of Victorville Water District to improve the Property with water storage tanks and related improvements ; provided however that, any such improvements will be undertaken only following environmental analysis as may be required under the California Environmental Quality Act (“CEQA”); and
WHEREAS, the Authority deems it desirable at this time to approve the sale of the Property.
NOW, THEREFORE, BE IT RESOLVED, DETERMINED AND ORDERED
BY THE COMMISSION OF THE SOUTHERN CALIFORNIA LOGISTICS AIRPORT AUTHORITY, AS FOLLOWS:
Section 1. That the foregoing Recitals are true and correct and are incorporated herein by this reference.
Section 2. That the Authority hereby approves the sale of the Property pursuant to the Purchase and Sale Agreement a copy of which is attached hereto as Exhibit “A”.
2 Section 3. That the Authority's Executive Director and Secretary are hereby authorized to take such action and execute the Purchase and Sale Agreement and such other documents as may be necessary in order to implement the aforementioned transaction on behalf of the Authority.
Section 4. That this Resolution shall take effect immediately upon its adoption.
Section 5. That the Authority S ecretary shall certify as to the adoption of this resolution and shall cause the same to be processed in the manner required by law.
PASSED, APPROVED and ADOPTED this __ day of ______, 2023, by the following vote:
_____________________________________
Chairperson of the Governing Board
of the Southern California
Logistics Airport Authority
ATTEST:
____________________________________
Secretary to the Southern California
Logistics Airport Authority
ATTACHMENT D
RESOLUTION NO. VWD 23-003
VICTORVILLE WATER DISTRICT
RESOLUTION NO. VWD 23 -003
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
VICTORVILLE WATER DISTRICT APPROVING THE PURCHASE
OF CERTAIN PROPERTY LOCATED AT SOUTHERN CALIFORNIA
LOGISTICS AIRPORT AND AUTHORIZING THE GENERAL
MANAGER TO EXECUTE SUCH DOCUMENTS AS NECESSARY TO
CONSUMMATE SUCH PURCHASE
WHEREAS, the Victorville Water District (the “ District”), is a county water district organized under the laws of the State of California and a subsidiary district of the City of Victorville; and
WHEREAS, the District has deemed it desirable to purchase from the Southern California Logistics Airport Authority c ertain property consisting of approximately 8.626 acres (the “Property”) located at the Southern California Logistics Airport; and
WHEREAS, the purchase of the Property is to be consummated pursuant to the terms of a certain Purchase and Sale Agreement in substantially the form attached hereto as Exhibit “A” and incorporated herein by this reference (the “Purchase and Sale Agreement”); and WHEREAS, the transaction contemplated hereby is a disposition of property with deed restrictions which has previously been determined by the California Department of Housing and Community Development to be exempt surplus land pursuant to Government Code Section 54221(f)(1)(G) for the purposes of California Surplus Lands Act; and
WHEREAS, it is the intent of the District to improve the Property with water storage tanks and related improvements provided, however that any such improvements will be undertaken only following environmental review as may be required under the California Environmental Quality Act (“CEQA”); and
WHEREAS, the Board of Directors of the District (the “ District Board”) authorizes the General Manager of the District to execute a Certificate of Acceptance in the Form of Exhibit “B”’ attached hereto and incorporate by this reference.
NOW, THEREFORE, THE BOARD OF DIRECTORS OF THE
VICTORVILLE WATER DISTRICT (“DISTRICT BOARD”) DOES HEREBY RESOLVE AS FOLLOWS:
Section 1. That the foregoing Recitals are true and correct and are incorporated herein by this reference.
Section 2. That the purchase of the Property pursuant to the Purchase and Sale Agreement, a copy of which is attached hereto as Exhibit “A”, is hereby approved.
Section 3. That the General Manager of the District is hereby authorized to take such actions and execute the Purchase and Sale Agreement, the Certificate of Acceptance, and such other documents as may be necessary in order to implement the aforementioned transaction on behalf of the District Board.
Section 4. That this Resolution shall take effect immediately upon its adoption.
Section 5. That the District Secretary shall certify to the passage and adoption of this Resolution; shall enter the same in the book of original Resolutions of the District; and shall make a minute of passage and adoption thereof in the records of the proceedings of the District, in the minutes of the meeting at which this Resolution is passed and adopted.
EXHIBIT A
PURCHASE AND SALE AGREEMENT
[TO BE INSERTED]
EXHIBIT B
Certificate of Acceptance
CERTIFICATE OF ACCEPTANCE
(Government Code Section 27281)
This is to certify that the interest in real property conveyed by the Grant Deed dated ______________________from the SOUTHERN CALIFORNIA LOGISTICS AIRPORT AUTHORITY, a joint powers authority organized and existing under the laws of the State of California, to the VICTORVILLE WATER DISTRICT, a county water district and subsidiary district of the City of Victorville organized under the laws of the State of California, is hereby accepted by order of the Board of Directors of the Victorville Water District pursuant to authority conferred by Resolution No. VWD 23-003 adopted on _____________, and the Grantee consents to the recordation thereof by its duly authorized officer
By: ____________________________
Keith C. Metzler
General Manager, Victorville Water District
Date: ________________
ATTACHMENT E
PURCHASE AND SALE AGREEMENT
1 PURCHASE AND SALE AGREEMENT
THIS PURCHASE AND SALE AGREEMENT (“ Agreement”) is made and entered into as of the _____ day of _____________, 2023, by and between THE VICTORVILLE WATER DISTRICT, a county water district and s ubsidiary district of the City of Victorville , organized under the laws of the State of California (“ Buyer” or “ Water District ”) and the SOUTHERN CALIFORNIA LOGISTICS AIRPORT AUTHORITY, a joint powers authority organized and existing under the laws of the State of California (“Seller” or “Authority”).
RECITALS
A. Seller is the owner of a parcel of real property, together with improvements thereon (the “ Property”), consisting of a total of 8.626 acres located in the City of Victorville, California, as more fully described in Exhibit "A" attached hereto and incorporated herein by this reference.
B. Seller has offered to sell Property to Buyer at a specified purchase price and has not been induced or influenced in any way by Buyer before commencing negotiations with the Buyer.
C. Buyer desires to acquire said Property with the proposed intent of constructing certain Water District facilities thereon, including, but not limited to, water storage tanks; however, use of the property for such purposes will not be undertaken until appropriate environmental review as may be required by the provisions of the California Environmental Quality Act (“CEQA”) has occurred; and.
D. The transaction contemplated hereby is a sale of property with deed restrictions which have previously been determined by the California Department of Housing and Community Development to be exempt pursuant to Government Code Section 54221(f)(1)(G) for the purposes of California Surplus Lands Act.
TERMS AND CONDITIONS
NOW, THEREFORE, in consideration of the preceding recitals (which are hereby incorporated and made a substantive part of this Agree ment) and the mutual promises and covenants hereinafter contained, the parties agree as follows:
Section 1. Acquisition; Acquisition Price. Subject to the provisions of Section 2 hereof, Buyer agrees to acquire from Seller the Property described in Exhibit "A" hereto. The price to be paid by the Buyer for the acquisition of the Property (the “Purchase Price”) shall be equal to SEVEN HUNDRED THOUSAND DOLLARS ($ 700,000.00).
Section 2. Payment of Purchase Price/Transfer by Grant Deed . The Purchase Price shall be paid in full by the Buyer. Upon payment of the Purchase Price, Seller shall transfer ownership of the Property being acquired by the Buyer by grant deed, substantially in the form attached hereto as Exhibit "B" and incorporated herein by this reference. 2 Section 3. Marketable Title. As a condition to the payment of such Purchase Price, Seller shall convey good and marketable title free of any title defects, liens, encumbrances, conditions, covenants, restrictions, and other adverse interests or known to Seller.
Section 4. Inspection. Buyer has inspected and evaluated the Property to ensure that it has been properly maintained. Any costs incurred by the Buyer in inspecting and approving the Property shall be paid by the Buyer.
Section 5. Property As -Is. Seller makes no representation, warranty, agreement, statement, guarantee or promise, other than those contained in this Agreement, and the Buyer acknowledges that Seller has made no such representation, agreement, statement, warranty, guarantee, or promise regarding the Property or the zoning, construction, physical condition, or other status of the Property, except as herein contained. The Property is being transferred to and accepted by the Buyer in its existing condition AS-IS AND WITH ALL FAULTS.
Section 6. Maintenance. Prior to the transfer of ownership of the Property by Seller to the Buyer, as provided herein, Seller shall be responsible for the maintenance of the Property and shall maintain and transfer same to the Buyer in as good condition as it was at the time of execution of this Agreement.
Section 7. Grant Deed. The Seller shall, at its sole cost, cause the preparation of the necessary legal descriptions and the Grant Deed for the Property.
Section 8. Assumption of Risk. Seller agrees to assume all risk of loss until transfer of title, except to the extent any liability or loss is directly caused by actions of the Buyer.
Section 9. Brokers. Both parties represent and warrant that they have not retained a broker and are not represented by a broker in connection with this Agreement.
Section 10. Binding Effect. This Agreement shall be binding on and inure to the benefit of the parties to this Agreement and their successors and assigns, except as otherwise provided in this Agreement.
Section 11. CEQA Compliance. Prior to undertaking any construction of water improvements or facilities on the Property, the Victorville Water District shall comply with the applicable provisions of CEQA. Nothing in this Agreement shall be construed to:
(a) bind any party, or commit to any definite course of action with respect to use or improvement of the Property, prior to CEQA compliance; (b) restrict the lead agency from considering any feasible mitigation measures and alternatives, including the “no project” alternative; and (c) restrict the lead agency from denying the project.
Section 12. Governing Law. This Agreement and the legal relations between the parties shall be governed by and construed in accordance with the laws of the State of California.
3 Section 13. Headings. The headings set forth in this Agreement are inserted for convenience only. They do not constitute part of this Agreement and shall not be used in its construction.
Section 14. General. This Agreement contains the entire agreement between the parties with respect to the matters herein provided, and may only be amended by a subsequent written agreement executed by all parties. This Agreement may be executed in counterparts, each of which shall be deemed an original, but which together shall constitute a single agreement.
[END OF THIS PAGE]
4 IN WITNESS WHEREOF, the parties have caused this Agreement to be executed as of the date first above written.
SELLER
SOUTHERN CALIFORNIA LOGISTICS
AIRPORT AUTHORITY
By:
___________________________________
Name:
________________________________
Title:
__________________________________
BUYER
VICTORVILLE WATER DISTRICT
By:
___________________________________
Name:
________________________________
Title:
__________________________________
ATTEST:
________________________________
Jennifer Thompson. Authority Secretary
ATTEST:
_____________________________
Jennifer Thompson, Water District Secretary
APPROVED AS TO FORM:
_____________________________________
Andre de Bortnowsky, Authority Counsel
APPROVED AS TO FORM:
_____________________________________
Andre de Bortnowsky, Water District Counsel
RISK MANAGEMENT:
_________________________________
Authority Risk Manager
RISK MANAGEMENT:
_________________________________
Water District Risk Manager
Exhibit “A” – Page 1
EXHIBIT "A"
[PROPERTY LEGAL DESCRIPTION]
Exhibit “B” – Page 1
EXHIBIT “B”
GRANT DEED
RECORDING REQUESTED BY:
Victorville Water District
WHEN RECORDED MAIL TO:
Victorville Water District
P.O. Box 5001
Victorville, CA 92393
Attn: District Secretary
APN: A Portion of 0459-211-14
GRANT DEED
***Recording of this document is fee-exempt under Government Code Section 6103 and 27383. No Documentary Transfer Tax is due on the document pursuant to Revenue Taxation Code Section 11922***
For valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the SOUTHERN CALIFORNIA LOGISTICS AIRPORT AUTHORITY, a joint powers authority organized and existing under the laws of the State of California (“Grantor”), hereby grants and conveys to the VICTORVILLE WATER DISTRICT, a county water district and subsidiary district of the City of Victorville organized under the laws of the State of California (“Grantee”), all that real property situated in the City of Victor ville, County of San Bernardino, State of California described as follows:
See Exhibit “A” attached hereto
The Grantee herein covenants by and for itself, its successors and assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of sex, marital status, race, color, religion, ancestry, national origin, physical handicap, sexual orientation or domestic partnership status in the sale, lease, sublease , transfer, use, occupancy, tenure, or enjoyment of the Property herein conveyed, nor shall the grantee or any person claiming under or through it, establish or permit any such practice or practices of discrimination or segregation with reference to the selection, location, number, use or occupancy of tenants, lessees, subtenants, sublessee or vendees in the Property. The foregoing covenants shall run with the land.
IN WITNESS WHEREOF, the undersigned state that they are the person(s) whose signature is required to convey the interest stated within this instrument and has/have caused this instrument to be executed as of the day and year indicated.
Exhibit “B” – Page 2
GRANTOR:
SOUTHERN CALIFORNIA LOGISTICS AIRPORT AUTHORITY
By: Dated :
Keith C. Metzler, Executive Director
Attested: Dated :
Jennifer Thompson, Secretary
Approved as to form:
By: Dated :
Authority Legal Counsel
Exhibit “B” – Page 3
CERTIFICATE OF ACCEPTANCE
[TO BE ATTACHED]
ATTACHMENT F
RESOLUTION NO. SCLAA 23-002
RESOLUTION NO. SCLAA 23-002
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTHERN CALIFORNIA
LOGISTICS AIRPORT AUTHORITY AMENDING THE ANNUAL BUDGET FOR FISCAL YEAR 2022-2023
WHEREAS, the Executive Director of the Southern California Logistics Airport Authority (“SCLAA”) did heretofore submit to the Board of Directors an estimate of the expenditures and revenues of the City of Victorville departments and offices, together with a proposed budget for the fiscal year 2022/2023; and
WHEREAS, copies of said budget were prepared and distributed to the SCLAA Board of Directors, approved by the Board of Directors prior to June 30, 2022, and have been available for inspection by the public in the office of the Authority Secretary of the SCLAA; and
WHEREAS, after preparation of the budget, a need to amend the budget is being recommended to the SCLAA Board of Directors for approval; and WHEREAS, the Executive Director or his designee will provide all necessary justification for the budget amendment in the associated SCLAA agenda report.
NOW, THEREFORE, THE BOARD OF DIRECTORS OF THE SOUTHERN
CALIFORNIA LOGISTICS AIRPORT AUTHORITY HEREBY RESOLVE AS FOLLOWS:
SECTION 1. That the annual budget for the fiscal year 2022/2023 for the Southern California Logistics Airport Authority be hereby amended to reflect a change in the amounts and associated accounts listed below and as described in the corresponding Agenda Item.
Account Amount Adjusted
4520145-46100
(Off Airport-Sale of Real/Personal Property)
$700,000
SECTION 2. That copies of such amended budget, certified by the Authority Secretary, shall be filed with the auditors of the SCLAA and in the office of the Authority Secretary for public inspection and certified copies thereof shall be made available for use by City of Victorville departments, offices and subsidiary districts of the City of Victorville.
Item Number: 22
City Council / Board of Directors
Written Communications
Meeting of: February 21, 2023
Submitted By:
Jennifer Thompson, City Clerk
Subject:
Attendance at National Association of Latino Elected and Appointed Officials (NALEO) 40th Annual Conference
Recommendation:
That Your Honorable City Council authorize attendance at the NALEO 40th Annual Conference for the Mayor, and Mayor Pro-Tem.
Fiscal Impact:
Unknown at this time, and dependent upon registration fees and travel costs. City Council travel and meetings expense account 1001220-52150 has a budgeted amount of $16,000 for Fiscal Year 2022-2023.
Strategic Plan Goal:
Goal F: Communication and Outreach
Background:
The City Council Policy and Procedure Manual, Chapter 8, Section IV, C states the following:
C. Advance City Council Approval of Expenditures for Events. Prior to making travel, transportation, and/or lodging arrangements for any Event for which a Councilmember wishes to be reimbursed by the City, the Councilmember must have the Event and the expenditure approved. Requests for travel and meeting expense reimbursements or City-paid travel and meetings for any Event(s) will require the advance approval of the City Council at a regularly-scheduled Council Meeting under an agendized item requesting such approval.
The foregoing requirement for approval of travel expenses shall not apply when the City Councilmember is traveling in connection with his/her required 2 9
3 3
attendance at meetings of legislative bodies of outside agencies to which the Councilmember has been appointed to serve as a City representative or alternate pursuant to Chapter 9, Section IV of this Manual.
Discussion:
At the February 7, 2023 City Council meeting, it was moved by Mayor Pro-Tem Becerra and approved by a majority vote to agendize an item for discussion and possible action to have the Mayor, Mayor Pro-Tem and the City Manager attend the NALEO 40th Annual Conference taking place July 11-13, 2023 in New York City. Being that the City Manager is head of operations and administrative functions, the City Council will only need to take action as it relates to attendance by the Mayor and Mayor Pro-Tem, therefore, this item is being presented to Council as requested.
Event Name Dates/Locations Costs
NALEO 40th Annual Conference July 11-13, 2023
New York City
$900 Registration
(non-member)
+ Travel
Staff remains available for any questions or comments you might have.
Attachments: None