DOWNTOWN STREET LIGHTS
VR0337
ADDITIONAL CONCRETE & ASPHALT
81.01 Kirt Carr
2/11/25
Five Thousand Four Hundred Thirteen Dollars and Ten Cents $5,413.10
CALIFORNIA C-10 LICENSE 99849
ENGINEERING - CONSTRUCTION - TECHNOLOGY - SERVICE
FOUNDED
1945
Change Request Proposal
Job Name: Date:
A-C Job No:
Description:
A-C CRP No:
Customer Job No:
To: CITY OF VISALIA
FINANCE
PO BOX 5078
VISALIA, CA 93278-5078
Attn:
Schedule Impact:
AMOUNT
Words:
Figure:
Price Valid Until:
Terms and Conditions:
Signed
A-C Electric Company Accepted by:
Signed
Name and Title
Date
Name and Title
Date
Print Date:
02/11/25
1. This proposal is valid for a period not to exceed (20) calendar days from the date of this proposal unless otherwise noted.
2. This proposal is contingent upon receiving a signed copy of this Change Request or receiving a mutually acceptable form of subcontract change order.
3. Progress billing will be based on work completed and materials stored.
4. This proposal excludes acceleration, losses of efficiency, as well as the cumulative impact of ongoing and new changes being directed. We reserve our rights to pursue reimbursement for these and any other costs that occur beyond the scope of our original contract.
5. Labor rates are based on the work being performed during regular working hours - overtime is not included unless specifically stated in this proposal.
6. Pricing is based on having unrestricted access to the work area.
7. Cutting and patching is excluded unless specifically included in the quote. 2/11/25
VISALIA DIVISION
Box 328
Visalia, CA 93279
O: (559) 732-4733
F: (559) 732-0954
www.a-celectric.com
Scott Blankenship
Item 3 -CCO #4
-:ll. 11-eciecAke~ -
[I--=-=-- \,
~
Downtown Visalia Streetlight
4/4/2016
VR0337 81.01
AREA
Additional CC & Asphalt
COST SUMMARY
Line Date DWR Quantity U Unit Price Amount
1 N/A N/A 1 E 5,413.10$ 5,413.10$
2 -$ -$
3 -$ -$
4 -$ -$
5 -$ -$
6 -$ -$
7 -$ -$
8 -$ -$
9 -$ -$
10 -$ -$
5,413.10$
A-C Electric Company
CUSTOMER Date:City of Visalia
CR No.:
REFERENCE
CUSTOMER JOB #
A-C JOB NUMBER
Cost Summary Total
Printed 2/11/2025
I I I I I I
_______ 11
Downtown Visalia Streetlight
City of Visalia DATE: 12/30/2024
VR0337 DWR DATE: N/A
AREA DWR NO.: N/A
CONTRACTOR REPORT NO. Rpt 1
Additional CC & Asphalt CR NO.: 81.01
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 - $ - $
2 - $ - $
3 - $ - $
4 - $ - $
5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment -$
15% Markup -$
Total Equipment -$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 S
11 12 2023-3842 RCC Concrete 8/17/2023 1 $ 4,921.00 S $4,921.00 13 M
14 M
15 Subtotal Material, Subs, and Rentals 4,921.00$
15% Material Markup -$
10% Sub/Specialists Markup 492.10$
15% Eq Rental Markup -$
TOTAL MATERIAL, SUBS, and RENTALS 5,413.10$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor -$
35% Mark Up -$
Total Labor -$
SUBTOTAL 5,413.10$
Subcontractor Markup -$
5,413.10$ T OTAL COST THIS REPORT
DE
SCRIPTION
A-C Electric Company
CUSTOMER
REFERENCE
A-C JOB NUMBER
CUSTOMER JOB #
Subcontractor additional concrete and asphalt Installation for T&M force account various locations.
Invoice Description
Pour and Finish Concrete
\\jefferson\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 81.01 Additional CC & Asphalt\REVISED 250210\Cal Trans EWB-2018 (100, 230301-230831) - 241031 Printed 2/11/2025 Ramirez Custom Concrete, Inc Lie. 1013322
1018 WTeapot Dome Ave
Porterville, CA 93257 US
+ 1 5592802840
[email protected]
ramirezcustomconcrete.com
lf\JVOI
BILL TO INVOICE # 2023-3842
AC Electric Company DATE 08/17/2023
1035 W Murray Ave, DUE DATE 09/16/2023
Visalia .. CA 93279 TERMS Net 30
ACTIVITY
Concrete Jobs:Labor
Concrete Finish work done at:
The Visalia Main St. Project.
-coordinate with onsite super visor on
concrete pours
-pour concrete
-finish concrete
-broom finish
-clean up
Dates worked and finished:
Total sq. ft. done:
08-16-23
421.25 sq, ft.
Total sq. ft. done:
08-17-23
437.50 sq, ft.
Total:
858.75 sq. ft. @$18.50 per sq. ft.
OTY
858.75
11ATE
18.50 AMOUNT
15,886.88
The Visalia Main St. Project. SUBTOTAL
TAX
TOTAL
BALANCE DUE
15,886.88
0.00 15,886.88
$15,886.88
CE
0 Days
DOWNTOWN STREET LIGHTS
VR0337
R-CALTRANS ROW
63.02 Kirt Carr
02 /07/25
Two Hundred Seventy-Three Thousand Two Hundred Ninety Dollars and Seven Cents $273,290.07
CALIFORNIA C-10 LICENSE 99849
ENGINEERING - CONSTRUCTION - TECHNOLOGY - SERVICE
FOUNDED
1945
Change Request Proposal
Job Name: Date:
A-C Job No:
Description:
A-C CRP No:
Customer Job No:
To: CITY OF VISALIA
FINANCE
PO BOX 5078
VISALIA, CA 93278-5078
Attn:
Schedule Impact:
AMOUNT
Words:
Figure:
Price Valid Until:
Terms and Conditions:
Signed
A-C Electric Company Accepted by:
Signed
Name and Title
Date
Name and Title
Date
Print Date: 02/07/25
1. This proposal is valid for a period not to exceed (20) calendar days from the date of this proposal unless otherwise noted.
2. This proposal is contingent upon receiving a signed copy of this Change Request or receiving a mutually acceptable form of subcontract change order.
3. Progress billing will be based on work completed and materials stored.
4. This proposal excludes acceleration, losses of efficiency, as well as the cumulative impact of ongoing and new changes being directed. We reserve our rights to pursue reimbursement for these and any other costs that occur beyond the scope of our original contract.
5. Labor rates are based on the work being performed during regular working hours - overtime is not included unless specifically stated in this proposal.
6. Pricing is based on having unrestricted access to the work area.
7. Cutting and patching is excluded unless specifically included in the quote. 02/07/2025
VISALIA DIVISION
Box 328
Visalia, CA 93279
O: (559) 732-4733
F: (559) 732-0954
www.a-celectric.com
Scott Blankenship
Scott Blankenship
Item 4 -CCO #4
-:ll. 11-eciecAke~ -
[I--=-=-- \,
CALTRANS ROW
4/4/2016
VR0337 63.01
AREA
COST SUMMARY
Line Date DWR Quantity U Unit Price Amount
1 1/24/2025 142350 Removed 1 E -$ -$
2 5/22/2023 SOS 5/21/23142407 1 E 10,936.74$ 10,936.74$ 3 5/23/2023 SOS 5/22/23142406 1 E 24,585.75$ 24,585.75$ 4 5/24/2023 SOS 5/23/23142427 1 E 9,633.25$ 9,633.25$ 5 5/25/2023 SOS 5/24/23142445 1 E 9,757.46$ 9,757.46$ 6 5/31/2024 SOS 5/30/23142504 1 E 1,453.75$ 1,453.75$ 7 -$ -$
8 -$ -$
9 -$ -$
10 -$ -$
56,366.95$
A-C Electric Company
CUSTOMER Date:CITY OF VISALIA
CR No.:
REFERENCE
CUSTOMER JOB #
A-C JOB NUMBER
Cost Summary Total
Printed 2/7/2025
I I I I I I
.....___ _____ ______.11
CALTRANS ROW
CITY OF VISALIA DATE: 7/11/2023
VR0337 DWR DATE: 5/22/2023 SOS 5/21/23
AREA DWR NO.: 142407
CONTRACTOR REPORT NO. Rpt 2
CR NO.: 63.01
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 0.87 0.15 429.76$ 2 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 2 0.87 0.15 243.31$ 3 MV548 F800 10 TON CRANE, VCT HCETD NATL 4986 8 43.67 $ 0.87 0.15 349.36$ 4 S1546 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 0.86 0.15 60.88$ 5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 1,083.31$
15% Markup 162.50$
Total Equipment 1,245.80$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 59523 KRC SAFETY 6/8/2023 KRC TRAFFIC CONTROL 1 $ 1,975.50 S $1,975.50 11 7161032 MD CONCRETE CUTTING & DEMO 5/31/2023 MD CONCRETE CUTTING 1 $ 2,283.43 S $2,283.43 12 S5522714.002 ALAMEDA 3/15/2023 WHITE MARKING PAINT 11 $ 7.44 M $81.87 13 213602575-007 UNITED RENTALS 6/1/2023 MINI EXCAVATOR RENTAL + TILTTRAILER 1 $ 127.69 R $127.69 14 R
15 Subtotal Material, Subs, and Rentals 4,468.49$
15% Material Markup 12.28$
10% Sub/Specialists Markup 425.89$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 4,925.82$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-GF GEN FORMAN MARK R LYONS 54.38 $ 27.98 $ 0.11 10 81.56$ 28.80 $ 0.11 1,224.99$ 100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 8 75.04$ 28.60 $ 0.11 920.31$ 100-A4 A4-60% ANDRES A AVENDANO 26.83 $ 22.29 $ 0.11 8 40.25$ 33.44 $ 0.11 654.34$ 100-A6 A6-70% JOSE M MARTINEZ 31.17 $ 23.64 $ 0.11 8 46.76$ 35.46 $ 0.11 730.07$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 3,529.71$
35% Mark Up 1,235.40$
Total Labor 4,765.11$
SUBTOTAL 10,936.74$
-$
10,936.74$
A-C Electric Company
CUSTOMER
REFERENCE
TOTAL COST THIS REPORT
A-C JOB NUMBER
CUSTOMER JOB #
DESCRIPTION Start of Shift 5/21/23 Layout saw cuts, and grinds on Court and Locust. Move trench plates, saw cut Locust, and start cutting down court for trench crossings.
Invoice Description
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 May\Revisions\CR 63.01 May EWBPrinted 2/7/2025 I I
,,t1_e clecbik e � -CALIFORNIAC-10LICENSE99849
ENGINEERING-CONSTR UCTION-TECHNOLOGY-SERVICE
Da ily Work Report
DWR #: 142407
Submitted By : MARK R LYONS on 5/23/2023 6:06:21 AM
Job /Work Order Number
VR 0337
Date
2023-05-22
CC O No./Area
Required for Mand R jobs
CR 63.01
Site/Location
Job Name
DOWNTOWN STREET LIGHTS
Job Home Local
100
P.O. Number
Court from MK to oak, locust from oak to MK
Division
Visalia
Descripti on of Work
Customer
CITY OF VISALIA
Local Reporting To
100
Quote orT&M
0 Quote
Work Comple ted?
0 Yes � No
� T&M
Layout saw cuts, and and grinds on court and locust. Move trench plates, saw cut locust and start cutting down court for trench crossings.
Employees
Technician Dispatch Time
MARK R LYONS 09:00 PM
ROBERTO ZAVALA 10:00PM
ANDRES A AVENDANO 10:00 PM
JOSE M MARTINEZ
Materials
Qty
11 Equipment
UOM
10:00 PM
Material
Cans white upright paint
End Time
07:30AM
06:30AM
06:30AM
06:30AM
Vendor
A-C Owned/Rental Hours A·C Eq. #/Rental Agency
A·C Owned 8 MV 653
A- C Owned 10 MV 541
A-C Owned 8 MV 548
Rental 8 10949061
Rental 8 10595346
A·C Owned 8 S1 546
Class ST OT DT TT Adders Verd
GF 0 10 0 0 0 0
F 0 8 0 0 0 0
A4 0 8 0 0 0 0
A6 0 8 0 0 0 0
Vendor/Truck Stock Packing Slip No.
Miles Equipment Description
0 Highway truck
0 Foreman truck
0 Highway truck
0 Trailer
0 Miniex
0 Light tower
Subcontractors
Ticket No.
63.01 259487
Approved By
Customer Representative ...
James Grier
Completed By
Field Representative. ..
Mark Lyons
2 KRC
MD
Company
Traffic control 9.Shrs
Saw cutting Shrs
Customer Signature
(ftL,__
Field Signature
Subcontract- Direct Job Item
Add Signers
0 Yes
,4.e t:kcbuc e�
Lie. 99849
5/21/23
$2283.43
11003 W. Goshen Ave
Visalia, CA 93291
(559) 651-4200 fax (559) 651-4202
Invoice
Date:
American Incorporated dba Invoice No.:
5/31/2023
7161032
MD Concrete Cutting and Demolition
Lic#951204
Bill to: A-C ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380
Service at: A-C ELECTRIC
LOCUST & OAK
VISALIA, CA
Description: Work Order 5178445 MD VISALIA Customer ID: 1034300 Work Order ID Salesperson
5178445 MD-DARWIN
Description of Work
Work Done 5/21-24/23
Saw 20.75HRS @$175/HR $3,631.25
Laborer 16.25HRS @ $125/HR $2031.25
Bobcat 16.25HRS@ $195/HR $3,168.75
Mobility 2.5HRS@ $120/HR $300.00
Qty Item Description
1.00 0
SAWCUT & DEMOLITION
Labor
PO Number Terms
VR0337 Net 30
Unit Price
9,133.75
Hourly Rate
When paying, please reference invoice number on remittance.
Remit to the address indicated on letterhead. 1.5% monthly finance fee may be assessed on halances over 30 days old. *All prices shown already include a 3% discount for cash/check payment. Credit Card payments-add 3% Quoted Prices include all applicable sales/use tax.
\\SAGE22\Timberline Office\9.5\Accounting\Report\Service Management\invoice.rpt Subtotal:
Total Due:
Billing Clerk.
To pay by credit card, scan the QR
code with your smart phone camera.
Customer#: 1034300
Invoice#: 7161032
Called in By
MARK
Ext Price
9,133.75
Ext Price
9,133.75
9,133.75
emarquez
I
I
TRAFFIC CONTROL~ SAFETY SUPPLIES~ EQUIPMENT RENTAL~ TRAFFIC DESIGN Invoice
5i.A.FETV CCI-.,. INC .
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fax.# 559-732-2684
Bill To
Date
6/8/2023
Job Info:
ACELECTRlC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALIA
VR0337
P.O. No. Terms Due Date
VR0337 Net30 7/8/2023
Date Item Description Quantity
05/21/2023 2 man 001 2 man lane closures - 1-8 hour shift 05/21/2023 Overtime Overtime - Per hour (8-12 hours)
05/21/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 05/22/2023 2 man 001 2 man lane closures - 1-8 hour shift 05/22/2023 Overtime Overtime - Per hour (8-12 hours)
05/22/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 05/23/2023 2 man 001 2 man lane closures - 1-8 how- shift 05/23/2023 Overtime Overtime - Per hour (8-12 hours)
05/23/2023 Arrowboard - A. .. Additional an·ow board(s) per shift (includes lane) 05/24/2023 2 man 001 2 man lane closures - 1-8 hour shift 05/24/2023 Overtime Overtime - Per hour (8-12 hours)
05/24/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 05/25/2023 2 man 001 2 man lane closures - 1-8 how- shift 05/25/2023 Overtime Overtime - Per how- (8-12 hours)
INDEMNITY AGREEMENT. All item:: covc..--cd by t:hi:: Ooct.Jmcnt: ::;h:.,11 be �t the :::ote ri:::k of the Cu:::tomcr. Cv::tomcr �&rec:: to defend .. indemnify �nd hold �rmtc::.:: KRC SAFETY CO ... it::: officer:.:,. di recto� �nd employee::,, from end ai;::eJ n:::t any :t,nd :t,II li�bi llty cl�I m!:,. J udi:mcnt:;:,. CO$� .. �ttorney fcc:::: ,, or dcm:ond:: of liti s:,atl on .:iirl::i nc from the u::c .. m:;:,I ntcn:oncc,. opcr:.i:itlon,. or po::::e:::.:J on of the cQvi pmcnt:
incl vdi ni.: but not Ii mi1:cd to,. tho:::c .:)r"'i � nc from the �c ·tlvc ncs:11 cc nee of KRC SA.F ETV CO ... 11::::; offl cc.--.. director-::: �nd employee:::,. 'from Injury to or dc::ith of t:hc. Cu:::tomcr., Cu:::tomc,....::::: e mpt oyce:::,. or any other per:.:on,. or from d::.ma:1.:c to .t,ny property,. ::::ave and except there :::::haitt be no obtf �ti on on the part of the Cu:::-to mcr to d efcnd .. I ndcmnlfy :ond hold h::,rmlc::::-:;. KRC SAFETY co ... it::: officer-:; ., director:::,. .::,nd employee::: .. if the tl abillfy,. cl�lm::: .. Judgment::: .. co:::t:::: ::iottorney::: fee::: ,. or dem�nd::.: of tlti�ti on othcr"VVi :::e �ivln& ri,:::::c to :::uch obli�tion an:::::e 'from the sole nes;:l l�encc or willful mi::::conduct of KRC SAFETY CO.,.
It::: officers, director::::., .:.nd employees:. 1-,: Cu::;tomer rcfu::::e::: to d c-fend., lndcmnlfy .:,nd hold h.:.rml cs:::: KRC SA.f'ETV CO . .., it::: offi cc,-,;.,. director,:;,. :;:,nd cmpl oycc::: :ond :::ub:::caucntly .:. dc1:crmi n:::,tl on I::: m:odc th;:,t li=:tbltlty I::: not due to the :::ote nes:.llgcncc orwittfut ml:::cond1,..1ct of KRC SAFETY CO . ., I� officer,. di rector:::,. and employee:::., Cu::::::tom er i::;:. oblli;ated to rclmbur:::c any .!Ind .!Ill ti.!»bltlty., ctalm:::,. Jud:s:mcnt-!;:., CO:!:-� ::,ttorney::: fee� .. or de rn:::,nd::: of liti s:-:::,t:i on i ncur-rcd by KAC SFAETY CO ... it:::; offl ccr-::: .. di rector-::: ,. .:,nd ,:mploy-=: e:::. Cu:;;tomcr .:,zrc c::; to notify K:RC SAF ETV co., Im mcdl;otcty in c;a:;:c of any ;occident �nd to obt.:.i n ·the name::: ,. addrc::::::e:::,. tel cphonc nu mbc:r::: .!Ind ot.hcr perti ncnt t nfor,.-nati on from alt p.!!ir"'ti e:::
Involved and all -.,...,-itne:::'S.c:::.
Ordered By:
Rate
I 1,555.50
3 115.00
I 75.00
I 1,555.50
4 115.00
2 75.00
I 1,555.50
4 115.00
I 75.00
I 1,555.50
3 I 15.00
2 75.00
I 1,555.50
6 I 15.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59523
Amount
1,555.50
345.00
75.00 1,555.50
460.00
150.00
1,555.50
460.00
75.00 1,555.50
345.00
150.00
1,555.50
690.00
$0.00
$10,527.50
$0.00
$10,527.50
I I
11 Subtotal $75.46
Tax $ 6.41
Total $81.87
AED/CST Br11
7044 AVE 304
PO BOX 760
INVOICE
~ 1ALAIMEDA
I ELECTRICAL DISTRIBUTORS
GOSHEN CA 93227-0760
559-651-2096 Fax 510-785-4457
ALAMEDA ELECTRICAL DISTRIBUTORS,INC
3875 Bay Center Place
A-C ELECTRIC
HOUSE ACCOUNT VISALIA
PO BOX 81977
BAKERSFIELD CA 93380
AERVOE 255 WHITE CONSTRUCTION
MARKING PAINT WATER-BASED 20oz
(12/CTN)
HAYWARD CA 94545
SHIP TO:
A-C ELECTRIC CO - HOUSE VISALIA
1035 WEST MURRAY AVENUE
VISALIA CA 93291
ENROLL TODAY!
Go To https://alamedaelectric.billtrust.com Use the enrollment token at the bottom of this invoice.
Have access to your invoices 24/7
Mar 15, 202312:58:41 PM M0176385 SUBTOTAL
FREIGHT
Thank You For Your Business! SALES TAX
Web Enrollment Token: KGH PLT ZWQ http://alamedaelectric.billtrust.com Left At Shop S5522714.002 AMOUNT DUE
All claims for shortage or errors must be made at once, returns require written authorization and are subject to handling charges. Special orders are non-returnable. This order is subject to the terms and conditions of our credit application. Overdue accounts will be charged a finance charge.
82.32 0.00
82.32
1 Day
Total $127.69
4 WEEK BILLING OUnited Rentals·
BIWfC!I' 6f.1 JUNO 9 3123 INVOICE
935 Jro.i!Tl! SKN JIADDOX PlAr
vrBALI'A CA !13Z9Z-6620
55!1•6.Z1-51J..Z
_3 A-C ELECTRIC VISALIA BRANCH
...t 1035 W MURRAY AVE
Dl VISALIA CA 93291-4721
~ Office: 661-410-0000 Cell: 559-679-7286
7.1.~11 MB 0.528 81085S21.p01 288171 1-2 o
111Mn1111111h1l1111111hrll1111 11l111•fllh111t11rul1ll1fl,I
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS:
~ Bguipment Description
l 10949061·· TRAILSlfTILT 12•-'i6•TO 9;99~JC'l'ANm!M
Make: TOW MASTER Model: T-9DT 16 1
Seri~l: 4KNBT232SKL162613
l 10595346 MINI EXCAVATOR 7400-9199#
Make: TAKEUCHI Model; TB240
Minimu1r1
Serial: 124002620 Meter out: 1435.80 Meter in: .oo
1 907/0525 MINI EXCAVATOR BUCKET 12"
SALES/MISCELLANEOUS ITEMS:
_ __.Q'-'-t..,_y Item
1 CA PERSONAL PROP TAX REIMB CHARGB
COMMENTS/NOTES:
CONTACT: JOB MERCADO
CELL#: 559-556-5783
[DRSORCA/MCI J
# 13
: 156339 Cuatomer #
Invoice Date
Date out
Billed Through
11.R Job Loe
: 06/01/23
1 11/30/22 03 ;30 PM
: 06/14/23 00: 00
UR Job It
Cuatcmer Job
p .o .•
R•queated By
Reserved By
Sale•parson
: 1035 W MURRAY AVE, V
: 430
ID;
: VR0337
: JOE MERCADO
1 CLIFFGENESIS SALUDEZ
: BRYN WHITE
• - --,
Invoice Amount; $2,553.88 ~
Terma: Due Upoo ReoGlpt
P&l'fflOOI optlOna; Contlcl OIi' cnlC.1t office 704-ilt6-4817 REMIT TO: UNITED RENTALS (NORTH AMEA!CA),INC.
P.O. BOX 05112'2
LOS ANGELES CA90074•1122
Day Week 4 Week
312.00 1,034.00 1,876.00
Rental Subtotal:
Price Unit of Meaeure
14.070 EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
TOtal:
Amount
4133. 73
1,876.00
N/C
2,339.73
Extended Amt .
l-4.07
l4.07
2,353.80
200.08
2,553.88
Billing period: 28 Days From 5/l?/23 03:30 PM Thru 6/14/23 03:30 PM Btfectiv• January l, 2021 and where p•naitt~ by law, united Re!lt•ls may impoaa a aurctiarge of 1.8\ tor credit card P•~nte on c}large accounts. Thia aurcha1"9• ii uot greater than our merch..,t discount rate for credit card tranaactiona Eld ia sulljact to &ale& tax in aome jurildiction•-
llfOTlClh Thia i,ivoica is 1ubjact to th• tenaa and. conditiou of tba Re11tal and. service Agra-.it, 'llhic:ll are available •t ..... --.n- ,..,4-, .. ,. .. -ui■ . .,om/laaal/r&Dtal-aarvtc:a-tax:m,-tJs aid whicl1 1u:·e incorporated h•r•i11 by %"eferenca. A COPr or THB JUmTAL
CALTRANS ROW
CITY OF VISALIA DATE: 9/1/2023
VR0337 DWR DATE: 5/23/2023 SOS 5/22/23
AREA DWR NO.: 142406
CONTRACTOR REPORT NO. Rpt 3
CR NO.: 63.01
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 4 0.87 0.15 286.77$ 2 S1706 SKIDSTEER, BOBCAT, EMSS HCESP BOBCAT CTERRA 2 43.69 $ 0.88 0.13 87.38$ 3 S1546 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 1 0.86 0.15 67.42$ 4 MV521 F-250 XL REGULAR CAB, VPUT [TRUCK] T&TT 20-28 7 34.49 $ 0.87 0.15 241.43$ 5 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 1 0.86 0.15 67.42$ 6 MV558 TRAILER-FLATBED 16K, TRF TRAIT TB-2 16-18 8 6.13 $ 1 0.63 0.43 52.90$ 7 - $ - $
8 - $ - $
Sub Total Equipment 803.33$
15% Markup 120.50$
Total Equipment 923.83$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 130880 STONEYS 10/6/2022 COLD MIX 4 $ 159.21 M $636.84 11 1 YARBS CALTRANS ROW 5/22 & 5/23 1 $ 10,361.15 S $10,361.15 12 59523 KRC SAFETY 6/8/2023 TRAFFIC CONTROL 1 $ 2,160.00 S $2,160.00 13 7161032 MD 5/31/2023 MD CONCRETE CUTTING 1 $ 2,283.43 S $2,283.43 14 213602575-007 UNITED RENTALS 6/1/2023 MINI EXCAVATOR RENTAL + TILT TRAILER 1 $ 127.69 R $127.69 15 Subtotal Material, Subs, and Rentals 15,569.11$
15% Material Markup 95.53$
10% Sub/Specialists Markup 1,480.46$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 17,164.25$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-GF GEN FORMAN MARK R LYONS 54.38 $ 27.98 $ 0.11 10 81.56$ 28.80 $ 0.11 1,224.99$ 100-GFx GEN FORMAN MARK R LYONS - $ - $ 2 108.75$ 29.61 $ 0.11 307.16$ 100-JW JOURNEYMAN KEVN L ANDRADE 44.23 $ 27.68 $ 0.11 6 66.35$ 28.34 $ 0.11 630.60$ 100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 9.5 75.04$ 28.60 $ 0.11 1,092.87$ 100-A4 A4-60% ANDRES A AVENDANO 26.83 $ 22.29 $ 0.11 9 40.25$ 33.44 $ 0.11 736.14$ 100-A6 A6-70% JOSE M MARTINEZ 31.17 $ 23.64 $ 0.11 9 46.76$ 35.46 $ 0.11 821.33$ Subtotal Labor 4,813.09$
35% Mark Up 1,684.58$
Total Labor 6,497.68$
SUBTOTAL 24,585.75$
-$
24,585.75$ T OTAL COST THIS REPORT
A-
C JOB NUMBER
CUSTOMER JOB #
DESCRIPTION
A-C Electric Company
CUSTOMER
REFERENCE
Start of Shift 5/22/23 Yarbs Grind trench plates recesses. MD Finsihed up saw cuts. Move and set trench locatins. Cold Mix over trench plates.
Invoice Description
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 May\Revisions\CR 63.01 May EWBPrinted 2/7/2025 I
4-e tleebuc e� -CALIFORNIAC,10LICENSE99849
ENG I NE ERIN G-C ON STRUC Tl ON-TECHNOLOGY-SERVI CE
Daily Work Report
DWR #: 142406
Submitted By: MARK R LYONS on 5/23/2023 5:59:26 AM
Job/Work Order Number
VR 0337
Date
2023-05-23
CCO No./Area
Required for Mand R jobs
CR63.01
Site /location
Job Name
DOWNTOWN STREET LlGHTS
Job Home Local
100
P.O.Number
Court from MK to oak and locust from oak to MK
Division
Visalia
Description of Work
Customer
CITY OF VISALIA
Local Reporting To
100
Quote orT&M
0 Quote
Work Completed?
0 Yes <') No
�T&M
Yarbs grind trench plate recesses. MD finished up saw cuts. Move and set trench plates over trench locations. Cold mix over trench plates .
Employees
Technician Dispatch Time End Time Class ST OT DT TT Adders Verd MARKRLYONS 07:00 PM 07:00AM GF 0 10 2 0 0 0
KEVIN LA NDRADE 11:30PM 05:30AM J 0 6 0 0 0 0
ROBERTO ZAVALA 08:00PM 06:00AM F 0 9.5 0 0 0 0
ANDRES A AVENDANO 08:00PM 05:30AM A4 0 9 0 0 0 0
JOSE M MARTINEZ 08:00PM 05:30AM A6 0 9 0 0 0 0
Materials
Qty UOM Material Vendor/Truck Stock Packing Slip No.
4 Yards cold mix Vendor
17 3/4"x4 'x4' trench plates Vendor
46 3/4"x4'x 8' trench plates Vendor
1 3/4"x4'x 10' trench plates Vendor
Equipment
A-C Owned/Rental Hours
A-COwned
A-COwned
A-COwned
A-COwned
A-COwned
Rental
A-C Owned
A-C Owned
Rental
Rental
Subcontractors
Ticket No.
259488
Approved By
Customer Representative. ..
James Grier
Completed By
Field Representative. ..
Marklyons
2 12
2 9
7 9
6 9
9 9
6 Company
Yarbs
KRC
MD
A-C Eq. #/Rental Agency Miles Equipment Description
Mv541 0 Foreman truck
S1706 0 Bobcat
S1546 0 Light tower
MV521 0 Cone truck
51547 0 Light tower
11041557 0 10kgradeall
S558 0 Bobcat trailer
S? Has no number 0 Trencher trailer
10595346 0 Mini ex
10949061 0 Mini ex trailer
Subcontract - Direct Job Item
Grind road for trench plate recess
Traffic control on court and locust 10hrs
Saw cut trench locations 6hrs
Customer Signature
�l-
Field Signature
✓�
./2
-y;:?//
Add Signers
Yes
11-/J Ckctu., /Jo,,rp=;
Lie. 99849
0 \J
4 Yards=8 tons
Subtotal $586.92
Tax $49.88
Total $636.84
BILL TO:
A-C Electric Company
Headquarters
P.O. Box81977
STONEY'S SAND & GRAVEL, LLC
9181 HIGHWAY 41
LEMOORE, CA 93245
INVOICE
559.924.9229 OCT I 8 ?.ft'r
DATE INVOICE #
559.924.7834 Fax 10/6J2022 130880
SHIPTO:
A-C Electric Company
300 N Tipton Street
Visalia, CA 93272
Bakersfield, CA 93380-1977
P.O.NUMBER TERMS REP SHIP VIA F.O.B. PROJECT
VR0337 Net30 JLA 10/6/2022
QUANTITY ITEM CODE DESCRIPTION PRICE EACH AMOUNT
23.7 TON/034 Cold Mix 94.20 2,232.54T
DeliveryT : 783653
865.05 ENVSC Environmental - Fuel Su11 Fee 0.22 190.31
) _
Thank You! We Appreciate Your Business!
Note: Invoice paid by credit card will have a 4% processin fee.
Tide to materials passes to purchaser at time and place of shipment. TOTAL $3,477.67 Ullount $ ___ Credit card [ J VISA [ ) MC Acct I ______ Exp. Date __ _
DAILY EXTRA WORK REPORT
CONTRACT NO.
SPECIFICATION NO.
WORK PERFORMEO BY Yarbs Grading and Paving, Inc.
OESCRIPTION OF WORK Caltrans ROW Crossings
TOTAL MATERIALS & EQUIPMENT COST B
SIGNATURE VERIFIES TIME, CLASSIFICATION, MATERIALS & EQUIPMENT, CONSTRUCTION EQUIPMENT, AND HAULING OF CONSTRUCTION EQUIPMENT.
OATE PERFORMED
OATE OF REPORT
5-22-23 & 5-23-23
9-Jun-2023
% ON HAULING OF CONSTRUCTION EQUIP, (D)
DWR INSPECTOR DATE CONTRACTOR'S FOREMAN/SUPERINTENDENT DATE
DWR FIELD ENGINEER DATE CONTRACTOR'S REPRESENTATIVE DATE DWR 2832 (Rev. 4/98) For instructions, see reverse side.
TOTAL THIS REPORT
Original: Project Headquarters
Copy: Contractor
Copy: Inspector
EXTENDED
$10,361.15
P.R. NO. LABOR
DESCRIPTION X (SALARY + VACATION)
Grinder Invoice #PR1000034090 SUBSISTENCE NO
Date: 06/08/2023
Time: 09:27:02 AM
YARBS GRADING & PAVING, INC.
P.O. SOX 87
FOWLER CA 93625
*** CERT I FI E O PAY ROLL ***
DOWNTOWN VISALIA STREETLIGHT & PAVING Job#: Y22-06
Payrol I #: 45
License #: 964071
Report Code: 48.86A
Page: 1
Period End: 05/28/2023
------------HOURS WORKED EACH DAY------------
J08 CLASSIFICATION MON TUE WED THU FRI SAT SUN TOTAL BASE FRINGE TOT HOURLY --TOTAL J08 PAY-- EMPLOYEE DATA 22 23 24 25 26 27 28 HOURS RATE + RATE = RATE BASE/OTH FRINGE ASHPALT RAKER/LABR REG: B.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 42.000 24.260 66.260 336.00 194.08 HUGO REYES --TOTAL PAY THIS J08-- -----TAX DEDUCTIONS----- ----OTHER DEDUCTIONS---- 585 S. SCHOOL STREET Base Hourly Pay 336.00 Federal W/Hol d 168.77 PIXLEY CA 93256 Fringe Paid to Plans 194.08 FICA 129.73 Vacation/Hal idy 147.93 077-74-7877 M/4 Male Hispanic Medicare 30.34
State W/Hold 56.54
Avg Hour Rate 66.260 State SOI/Local 18.83
----------J08 FRINGE BENEFIT SUMMARY---------- ---------------------------------TOTAL PAY ALL JOBS-------------------------------- ADMIN p O.BO ANNUITp 35.36 APPRENp 4.00 Gross Pay: 2092.34 Less Deductions: 552. 14 = Net Pay: 1540.20 Check# 2010 HEALTHp 76.80 INOUSTp 1.44 PENSN p 75.68
GROUP 1 OPERATOR REG: 8.00 0.00 0.00
OVT: 5.00 0.00 0.00
CARLOS SANCHEZ GALLARDO
3050 JOY STREET
SELMA CA 93662
602-06-7232 M/1 Male Hispanic
0.00 0.00 0.00 0.00 8.00 64.455 26.860 91.315 515. 64 214.88
0.00 0.00 0.00 0.00 5.00 97.750 26.860 124.610 488. 75 134.30 --TOTAL PAY THIS JOB-- -----TAX DEDUCTIONS----- ----OTHER DEDUCTIONS---- Base Houri y Pay 1004.39 Federal W/Hol d 404.06
Fringe Paid to Plans 349. 18 FICA 187. 51
Medicare 43. 85
State W/Hold 158. 84
Avg Hour Rate 104. 121 State SOI/Local 27.22
Vacation/Hal idy 264. 15
----------JOB FRINGE BENEFIT SUMMARY---------- ---------------------------------TOTAL PAY ALL JOSS--------------------------------- AOMIN p 4.29 AFFACTp 14.56 ANNUITp 13. 00 Gross Pay:
HEALTHp 140.92 INOUSTp 0.78 IUOEFOp 0.65
MKTAREp 1. 43 PENSN p 140.14 RETWELp 33. 02
VACFEEp 0.39
J08 TOTALS MON TUE WED THU FRI
22 23 24 25 26
REG: 16.00 0.00 0.00 0.00 0.00
OVT: 5.00 0.00 0.00 0.00 0.00
3024.31 Less Deductions:
SAT SUN TOTAL
27 28 HOURS
0.00 0.00 16.00
0.00 0.00 5.00
Totals: 21.00
1085.63 = Net Pay: 1938.68 Check# 2013
--TOTAL J08 PAY--
8ASE/OTH FRINGE
851.64 408.96
488.75 134.30
--------- ---------
1340.39 543. 26
Date: JUNE OB, 2023
I, LAURIE ANN O'BRIEN
(name)
S T A T E M E N T O F C O M P L I A N C E
OFFICE MANAGER
(title)
do hereby certify under pena I ty of perj ury:
Payrol I No�45�_
(1) That I pay or supervise the payment of the persons employed by: YARBS GRADING & PAVING, INC. on the:
DOWNTOWN VISALIA STREETLIGHT & PAVING , that during the payrol I period commencing on the 22nd DAY OF MAY, 2023 and ending the 28th DAY OF MAY, 2023, al I persons employed on said project have been paid the ful I weekly wages earned, that no rebates have been or wil I be made either directly or indirectly to or on behalf of said YARBS GRADING & PAVING, INC. from the full weekly wages earned by any person and that no deductions have been made either directly or indirectly from the ful I wages earned by any person, other than permissible deductions, as described below:
Taxes: FEDERAL W/HOLD FICA
Other: VACATION
MEDICARE STATE W/HOLO STATE SDI/LOCAL
(2) That any payrol Is otherwise under this contract required to be submitted for the above period are correct and complete; that the wage rates for laborers or mechanics contained therein are not less than the applicable wage rates contained in any wage determination incorporated into the contract; that the classifications set forth therein for each laborer or mechanic conform with the work he performed. (3) That any apprentices employed in the above period are duly registered in a bona fide apprenticeship program registered with a State apprenticeship agency.
(4) That:
(a) WHERE FRINGE BENEFITS ARE PAID TO APPROVED PLANS, FUNDS, OR PROGRAMS In addition to the basic hourly wage rates paid to each laborer or mechanic I isted in the above referenced ___!'t._ payroll, payments of fringe benefits as I isted in the contract have been or wil I be made to appropriate programs for the benefit of such employees, except as noted in Section 4(c) below. (b) WHERE FRINGE BENEFITS ARE PAID IN CASH
Each laborer or mechanic I isted in the above referenced payrol I has been paid as indicated on the payrol I, an amount not less than the sum of the applicable basic hourly wage rate plus the amount of the required fringe benefits as listed in the contract, except as noted in Section 4(c) below:
(c) EXCEPTIONS
Remarks:
LAURIE ANN O'BRIEN
(name)
CRAFT
OFFICE MANAGER
(title)
EXPLANATION
(signature)
On federally funded projects, permissible deductions are defined in Regulations, Part 3 (29 CFR Subtitle A), issued by the Secretary of Labor under the Copeland Act, as amended (48 Stat. 948 63 Stat. 108, 72 Stat. 967; 76 Stat. 357; 40 U.S.C. 276c).
Also, the willful falsification of any of the above statements may subject the contractor or subcontractor to civil or criminal prosecution (see Section 1001 of Title 18 and Section 231 of Title 31 of the United States Code).
CONTRACT NO. �,.,i-1-s:o,.. .. ..,i ,Jise....\1� s�\,,.1v.J- SPECIFICATION NO. ___________ _
WORK PERF ORMED BY_..._'y_e,....,�-b_':>.,___ ____ _
DAILY EXTRA WORK REPORT
YI\RBS
grading.:�-paving � DATE PERFORMED _ ...... 5�--�...,2�-_.,,,.�-3--��A_....,.,_�- DATE OF REPORT---------=::::::==::..__
License #964071
DESCRIPTION OF WORK���--CA!�./-: __ c;_ ... _V\�d�---·l ...... o_c_c,1,._-h_''-"�.S-�_�01:Jl.��S'�•�'{)....._.'S������r-_a...,J._ Co-..tt.r EQUIP. NO. CONSTRUCTION EQUIPMENT HOURS RATE EXTENDED P.R. NO. LABOR HOURS HOURLY EXTENDED :V 1-U p,,,,._,J, VO u
.
TOTAL CONSTRUCTION EQUIPMENT COST C
HAULING OF CONSTRUCTION EQUIPMENT
DESCRIPTION NO. UNIT UNIT COST
HAULING OF CONSTRUCTION EQUIPMENT D
MATERIA LS & EQUIPMENT AND /OR WORK DONE BY SPECIALIST
DESCRIPTION NO. UNIT UNIT COST
.....
..
TOTAL MATERIALS & EQUIPMENT COST B
SI GNATURE VEAIFll:S TIME, CLASSlFlCATJON, MATEAIALS & EQUIPMENT, CONSTRUCTION EQUIPMENT, AND HAULING OF CONSTRUCTION EQUIPMENT. 'L\.-Q� .-,jzt,... L>
-
AMOUNTS
-· ...
..
t·.
�
DWR I\ECT°' ~ - DATE CONTRACTOM FOAEJ Wl/SUPERIN,�
DWR FIELD ENGINEER DATE CONTRACTORS REPRESEJNTATIVE
DEW(® 04-14
RATE
P. _/ c;;;;J, L ·- REG q
OT
REG
OT
REG ·
OT
REG
OT
REG
OT
REG [i
OT
REG
OT
REG
OT
..
REG .
I ...
OT
REG
OT
SUBTOTAL
(RATE) X (SALARY + VACATION)
PAYROU.: TAXES & INSURANCE
SUBSISTENCE NO
SUBSISTENCE NO
OTHER
TOTAL LABOR COST A
% ON LABOR COST
•. - ..
(�f
% ON MATERIALS & EQUIPMENT COST (B)
... : % O!)J C<JNSTRUCTIOt. EQUIPMENT COST (Cl
% ON HAULING OF CONSTRUCTION EQUIP. (D)
"-J.:.J..--d-'_J TOTAL THIS REPORT -oATE
DATE
..
..
.
AMOUNTS
....
..
-- -- ------
·. -
•· _;•
'. .•••
•'•.
.•
.
..
-, -··
.
..
...
( ]
I I I I II
I
- ..
I I I
't=:a'c;lll!!C;&l;O
~-~~
I . I I II
II I I II I I I I II
II I I II I I I I II
II I I II I I I I II
II I I II I l f -- -- II
I I I II I I I II
I
I I I
I I I
I I II I .- L II I
I I II I I I I II
I I II I I I -- l II
I I II I I I I II
I I II I I I I II
I I II I I I II
I I II I I I ]:; ,, I II
I
I I I I. I II II
I
I I
a II I I I
I I
I -
:1
I I II
I II I
. -----
•--- _-.• --
I ........ A
- .--- ~
- - ......
!
~C1nJl""J..1T_, - • -
DAILY EXTRA WORK REPORT
DATE PERFORMED 5 - �d:::q_ -;;L'?,.� a..o� 'YARBS' CONTRACT NO. PlMH-..-/..., •• ,N, Vl)�lt.c SPECIFICATION NO•------,--+--------
WORK PERFORMED BY--E-4--'"<.>-!v'-b�s'------- DATE OF REPORT �5--....,,�..:::=1;.c.---"�c.=....3.,__ ____ _ "' grading '.paving ....
Lic�nse #964071
(!c,v,,---1--DESCRIPTION OF WORK l.o :y,, v+
EQUIP. NO. CONSTRUCTION EQUIPMENT HOURS RATE EXTENDED
AMOUNTS
YI-ti (;) ltA'. t;.J 0
TOTAL CONSTRUCTION EQUIPMENT COST C
HAULING OF CONS TRUCTION EQUIPMENT
. DESCRIPTION NO, UNIT UNIT COST
y :.1 1-'J.. Lu:,J...,+ I -., -
Ir
.. ... .. .I ,.\- A ...
l'P?-� 1'\ 9ffi � \W wir-\'t;�n "'()V\ .a <•<-f/)
I"
\),."- r. \\.JV-' - �� . ,
HAULING OF CONSTRUCTION EQUIPMENT D
MATERIALS & EQUIPMENT AND/OR WORK DONE BY SPECIALIST
DESCRIPTION NO. UNIT UNIT COST
• ..
.
P.R.NO. LABOR
[:t__;.e:, c...; #A:.i,J.n:..,.r:.
I I - .,..
....
• I f ,;,•.o • Tk\'• c.: >
II
/ \ -
,./_ •• \ \I ·1
tl' 1,,,- - • JI IM�,�
I ·v ,.. _,/
.•.
,1\//r-r I < \\
f .
PAVROU.·TAXES & INSURANCE
SUBSISTENCE NO
SUBSISTENCE NO
OTHER
REG
OT
REG
OT
REG
OT
REG
OT
REG
OT
REG
OT
REG
OT
REG
OT
REG
OT
REG
OT
HOURS
,r -
..
:jiff . , "'-- . ·"
'
·---�· ...•
•· ..
r'>'lr,
SUBTOTAL
HOURLY
RATE
.
.{ t,..
(RATE) X (SALARY+ VACATION)
..
......
TOTAL LABOR COST A
EXTENDED
AMOUNTS
..
..
TOTAL MA TERIALS & EQUIPMENT COST B % ON LABOR COST (Aj .. ••·••• . • <· • ..
SIGNATURE VERIFIES TIME, CLASSIFICATION, MATERIALS & EQUIPMENT, % ON MATERIALS & EQUIPMENT COST (B) � _ L,(l =�'"'" """�:;;; ocro72?, . .% ON CONSTRUCTION EOUIPMENT,COST (C) .> · ..
�-J-J-�J
% ON HAULING OF CONSTRUCTION EQUIP. (D)
TOTAL THIS REPORT :{ ••••• f·.'
DWR l�EaTOR DATE
j
CIQlJjffiACTORS FOREMAN/SUPERINTENDENT DATE ; • .C;'.;' < .• ; '"
DWR FIELD ENGINEER DATE CONTRACTORS REPRESENTATIVE DATE DEW(�) 04-14
"'-
I
I
II
~
II
II
II
I
I
I
../
\
.
I
...... ~
~
• '
-~
I I
I I
I I
"
I
I I
L I
I I
I I
I I
I
I I
I
T
I
t
I I
I
I I I
I I I
I I I
I I I
I
II I
-·
-II I .
ll I
·-
. --
II I •
II I
II I
II I
II I
II I
II I
II I
~-. . .
T
' ,_· ..
-
II
1~1•i -. •·:-~1.ltl
I
;
I
I,
- -
I I ------
I I !I I ~ I I - I I I I II
- - I I I II
I I I II
I I I I
I I I
1· I I I
I I I
I I I
I I I
I I .I
J ~: : I .I I
. .: . 1. --
I,~ 1~.•H'!· S ~ 1-I~ I I II
I I I II
I
I I
II
II
I
I I ...
...
...
'
•· -.·.
CUSTOMER'S ORDER NO.
i-l.2- - 0{;
NAME
ADDRESS
SOLD BY CASH
QTY.
RECEIVED BY
PHONE
C.O.D. CHARGE ON ACCT. -MDSE. RETO, P.AID OUT
DESCRIPTION PRICE
ci Z6o
TAX
TOTAL
AMOUNT /'9
0 ! rz4/001
.
I
All claims and returned goods MUST be accompanied by this bill. <=Jhank�u
I l
I
Statewide - Visalia
P.O. Box 6486
Visalia, CA 93290
Phone: 559-625-4636
[email protected]
!To:
Y arbs Grading & Paving
Attn: Accounts Payable
P.O.Box 87
Fowler, Ca 93625
DATE
#Y22-13Nisalia
CURRENT 1-30 DAYS
2,545.00 2,400.00
TRANSACTION AMOUNT
Statement
I DATE I
5/27/2023
AMOUNT DUE
$6,705.00
BALANCE
ay Construction Sweeping/Job 1,465.00
31-60 DAYS
880.00
61-90 DAYS OVER 90 DAYS AMOUNT DUE
880.00 0.00 $6,705.00
Accounts paid past 30 days are subject to a
late fee of 1.5% or $35.00 on the balance.
... ,
Pavement Recycling Systems, Inc.
An Employee Owned Company
10240 San Sevaine Way
Jurupa Valley, CA 91752
Phone:(951) 682-1091 Fax·.(951) 682-1094
www.pavementrecycling.com
CA Lie# 569352 - AZ Lie# 183900 - NV Lie# 0036228
Tax ID: 33-0353433
To: Yarbs Grading And Paving, Inc.
ATTN: Accounts Payable
P.O. Box 87
Fowler, CA 93625
PRS Job No: PJR024078
Y22-06 - MAIN STREET IMPROVEMENTS
Invoice Number: PRI000034090
Invoice Date: 05/22/2023
Payment Terms: Net 35 days
Job Location: W Main St & S Willis St EQUIPMENT RENTAL
Visalia, CA 93291
Your job No: Y22-06
Description
4' Milling Machine Rental Day Rate
Mobilization
Unit Price
$3,800.000
$690.000
For your convenience, we accept the American Express"'Cartl and other major credit cards.
Please fill in 1he information below.
_____________ -c=c-___ Mo. Yr. Account Number 0/C Expiration Date Gardmember Signature Amount Date
■
s
. VISA
Previous Quantity This Amount This
Quantity Estimate Estimate
2.000 1.000 $3,800.00
4.000 1.000 $690.00
Total $4,490.00
Less Previous Billings
Amount Due $4,490.00
1. Invoice to be paid within 35 days of invoice date
2. No retention may be withheld
3. Late charges on past due invoices will be assessed
penalties at 1.5% per month of outstanding balance
4. There will be a 1 % fee on all credit card payments
Total Amount
to Date
$11,400.00
$3,450.00
$14,850.00
$10,360.00
$4,490.00
Pavement Recycling Systems, Inc.
10240 San Sevaine Way
Jurupa Valley, CA 91752
Phone:(951) 682-1091
Fax: (951) 682-1094
www.pavementrecycling.com
Date: 5/22/2023 WO #2191413
Customer: Yarbs Grading And Paving, Inc.
PRS#: P JR024078 Your#: Y22-06
Customer#: CR01289 Contract#: CONR029584
Project: Y22-06 - MAIN STREET IMPROVEMENTS Location: W Main St & S Willis St Description:
Terms:
Work Order
Mill AC Pavement - As directed by customer in the field. Rent [4'] Rotomill with 1 operator and support truck. All support equipment by others including water supplied to our machine at the rate of [350] gal/hour. Based on one move-in.
1. [4'] Rotomill Operated & Maintained. Lump Sum Includes 4 Hours.
2. 1 Operator overtime premium at $55.00 per hour.
3. Costs to repair our machine caused by hitting unmarked buried objects billed on a "T & M" basis.
4. Invoice to be paid within 35 days from invoice date. No Retention may be withheld.
5. Late charges on past due invoices will be assessed penalties at 1.5% per month of outstanding balance.
6. All work to be performed under the supervision and direction of customer. Customer assumes all liability for any claims arising from work performed as directed.
Field Measured Quantities
Move# Item# Location Length Width Depth SF SY CY
4' Milling Machine Rental First 4 Hours
4' Milling Machine Rental Day Rate
Mobilization
4' Mill - After 4 Hours
4' Mill - After 8 Hours
Auth. Signature:
Billing
0.0000 -- ...... -................ ... ...
1.0000 -------- ----- --
1.0000 ---··--·-----··
0.0000 ---·--··----··-·
0.0000 ___ ___ ___ ____ .. _
LS
DY
Ea
HR
HR
$3200.000 0.00 ·-· -··········-··--··· ······-
$3800.000 3800.00
$690.000
$300.000
$500.000
690.00
0.00 0.00
Amount Due: 4490.00
Date: 05/23/2023
Quantity calculations may not be accurate. Billing quantities will be based on accurate computations.
By Agreement, PRSI has not notified any underground alert service. All work performed by PRSI for Contractor (Customer) is done with ex-press understanding that Contractor (Customer) has complied with and accepts all responsibilities and liabilities in and for the requirements of the regional notification center law pursuant to Article 2 (commencing with Section 4216) of Chapter 3.1 of Division 5 of Title 1 of the Government code. 5/22/23
$2283.43
11003 W. Goshen Ave
Visalia, CA 93291
(559) 651-4200 fax (559) 651-4202
Invoice
Date:
American Incorporated dba Invoice No.:
5/31/2023
7161032
MD Concrete Cutting and Demolition
Lic#951204
Bill to: A-C ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380
Service at: A-C ELECTRIC
LOCUST & OAK
VISALIA, CA
Description: Work Order 5178445 MD VISALIA Customer ID: 1034300 Work Order ID Salesperson
5178445 MD-DARWIN
Description of Work
Work Done 5/21-24/23
Saw 20.75HRS @$175/HR $3,631.25
Laborer 16.25HRS @ $125/HR $2031.25
Bobcat 16.25HRS@ $195/HR $3,168.75
Mobility 2.5HRS@ $120/HR $300.00
Qty Item Description
1.00 0
SAWCUT & DEMOLITION
Labor
PO Number Terms
VR0337 Net 30
Unit Price
9,133.75
Hourly Rate
When paying, please reference invoice number on remittance.
Remit to the address indicated on letterhead. 1.5% monthly finance fee may be assessed on halances over 30 days old. *All prices shown already include a 3% discount for cash/check payment. Credit Card payments-add 3% Quoted Prices include all applicable sales/use tax.
\\SAGE22\Timberline Office\9.5\Accounting\Report\Service Management\invoice.rpt Subtotal:
Total Due:
Billing Clerk.
To pay by credit card, scan the QR
code with your smart phone camera.
Customer#: 1034300
Invoice#: 7161032
Called in By
MARK
Ext Price
9,133.75
Ext Price
9,133.75
9,133.75
emarquez
I
I
TRAFFIC CONTROL~ SAFETY SUPPLIES~ EQUIPMENT RENTAL~ TRAFFIC DESIGN Invoice
5i.A.FETV CCI-.,. INC .
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fax.# 559-732-2684
Bill To
Date
6/8/2023
Job Info:
ACELECTRlC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALIA
VR0337
P.O. No. Terms Due Date
VR0337 Net30 7/8/2023
Date Item Description Quantity
05/21/2023 2 man 001 2 man lane closures - 1-8 hour shift 05/21/2023 Overtime Overtime - Per hour (8-12 hours)
05/21/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 05/22/2023 2 man 001 2 man lane closures - 1-8 hour shift 05/22/2023 Overtime Overtime - Per hour (8-12 hours)
05/22/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 05/23/2023 2 man 001 2 man lane closures - 1-8 how- shift 05/23/2023 Overtime Overtime - Per hour (8-12 hours)
05/23/2023 Arrowboard - A. .. Additional an·ow board(s) per shift (includes lane) 05/24/2023 2 man 001 2 man lane closures - 1-8 hour shift 05/24/2023 Overtime Overtime - Per hour (8-12 hours)
05/24/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 05/25/2023 2 man 001 2 man lane closures - 1-8 how- shift 05/25/2023 Overtime Overtime - Per how- (8-12 hours)
INDEMNITY AGREEMENT. All item:: covc..--cd by t:hi:: Ooct.Jmcnt: ::;h:.,11 be �t the :::ote ri:::k of the Cu:::tomcr. Cv::tomcr �&rec:: to defend .. indemnify �nd hold �rmtc::.:: KRC SAFETY CO ... it::: officer:.:,. di recto� �nd employee::,, from end ai;::eJ n:::t any :t,nd :t,II li�bi llty cl�I m!:,. J udi:mcnt:;:,. CO$� .. �ttorney fcc:::: ,, or dcm:ond:: of liti s:,atl on .:iirl::i nc from the u::c .. m:;:,I ntcn:oncc,. opcr:.i:itlon,. or po::::e:::.:J on of the cQvi pmcnt:
incl vdi ni.: but not Ii mi1:cd to,. tho:::c .:)r"'i � nc from the �c ·tlvc ncs:11 cc nee of KRC SA.F ETV CO ... 11::::; offl cc.--.. director-::: �nd employee:::,. 'from Injury to or dc::ith of t:hc. Cu:::tomcr., Cu:::tomc,....::::: e mpt oyce:::,. or any other per:.:on,. or from d::.ma:1.:c to .t,ny property,. :::ave and except there :::::haitt be no obtf �ti on on the part of the Cu:::-to mcr to d efcnd .. I ndcmnlfy :ond hold h::,rmlc::::-:;. KRC SAFETY co ... it::: officer-:; ., director:::,. .::,nd employee::: .. if the tl abillfy,. cl�lm::: .. Judgment:::: .. co:::t:::: ::iottorney::: fee::: ,. or dem�nd::.: of tlti�ti on othcr"VVi :::e �ivln& ri,:::::c to :::uch obli�tion an:::::e 'from the sole nes;:l l�encc or willful mi::::conduct of KRC SAFETY CO.,.
It::: officers, director::::., .:.nd employees:. 1-,: Cu::;tomer rcfu::::e::: to d c-fend., lndcmnlfy .:,nd hold h.:.rml cs:::: KRC SA.f'ETV CO . .., it::: offi cc,-,;.,. director,:;,. :;:,nd cmpl oycc::: :ond ::::ub:::caucntly .:. dc1:crmi n:::,tl on I::: m:odc th;:,t li=:tbltlty I::: not due to the :::ote nes:.llgcncc orwittfut ml::::cond1,..1ct of KRC SAFETY CO . ., I� officer,. di rector:::,. and employee::::., Cu::::::tom er i::;:. oblli;ated to rclmbur:::c any .!Ind .!Ill ti.!»bltlty., ctalm::::,. Jud:s:mcnt::::., CO:!:-� ::,ttorney::: fee� .. or de rn:::,nd::: of liti s:-:::,t:i on i ncur-rcd by KAC SFAETY CO ... it:::; offl ccr-::: .. di rector-::: ,. .:,nd ,:mploy-=: e:::. Cu:::tomcr .:,zrc c::; to notify K:RC SAF ETV co., Im mcdl;otcty in c;a:;:c of any ;occident �nd to obt.:.i n ·the name::: ,. addrc::::::::e::::,. tel cphonc nu mbc:r::: .!Ind ot.hcr perti ncnt t nfor,.-nati on from alt p.!!ir"'ti e::::
Involved and all -.,...,-itne::::'S.c:::.
Ordered By:
Rate
I 1,555.50
3 115.00
I 75.00
I 1,555.50
4 115.00
2 75.00
I 1,555.50
4 115.00
I 75.00
I 1,555.50
3 I 15.00
2 75.00
I 1,555.50
6 I 15.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59523
Amount
1,555.50
345.00
75.00 1,555.50
460.00
150.00
1,555.50
460.00
75.00 1,555.50
345.00
150.00
1,555.50
690.00
$0.00
$10,527.50
$0.00
$10,527.50
I I
1 Day
Total $ 127.69
4 WEEK BILLING OUnited Rentals·
BIWfC!I' 6f.1 JUNO 9 3123 INVOICE
935 Jro.i!Tl! SKN JIADDOX PlAr
vrBALI'A CA !13Z9Z-6620
55!1•6.Z1-51J..Z
_3 A-C ELECTRIC VISALIA BRANCH
...t 1035 W MURRAY AVE
Dl VISALIA CA 93291-4721
~ Office: 661-410-0000 Cell: 559-679-7286
7.1.~11 MB 0.528 81085S21.p01 288171 1-2 o
111Mn1111111h1l1111111hrll1111 11l111•fllh111t11rul1ll1fl,I
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS:
~ Bguipment Description
l 10949061·· TRAILSlfTILT 12•-'i6•TO 9;99~JC'l'ANm!M
Make: TOW MASTER Model: T-9DT 16 1
Seri~l: 4KNBT232SKL162613
l 10595346 MINI EXCAVATOR 7400-9199#
Make: TAKEUCHI Model; TB240
Minimu1r1
Serial: 124002620 Meter out: 1435.80 Meter in: .oo
1 907/0525 MINI EXCAVATOR BUCKET 12"
SALES/MISCELLANEOUS ITEMS:
_ __.Q'-'-t..,_y Item
1 CA PERSONAL PROP TAX REIMB CHARGB
COMMENTS/NOTES:
CONTACT: JOB MERCADO
CELL#: 559-556-5783
[DRSORCA/MCI J
# 13
: 156339 Cuatomer #
Invoice Date
Date out
Billed Through
11.R Job Loe
: 06/01/23
1 11/30/22 03 ;30 PM
: 06/14/23 00: 00
UR Job It
Cuatcmer Job
p .o .•
R•queated By
Reserved By
Sale•parson
: 1035 W MURRAY AVE, V
: 430
ID;
: VR0337
: JOE MERCADO
1 CLIFFGENESIS SALUDEZ
: BRYN WHITE
• - --,
Invoice Amount; $2,553.88 ~
Terma: Due Upoo ReoGlpt
P&l'fflOOI optlOna; Contlcl OIi' cnlC.1t office 704-ilt6-4817 REMIT TO: UNITED RENTALS (NORTH AMEA!CA),INC.
P.O. BOX 05112'2
LOS ANGELES CA90074•1122
Day Week 4 Week
312.00 1,034.00 1,876.00
Rental Subtotal:
Price Unit of Meaeure
14.070 EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
TOtal:
Amount
4133. 73
1,876.00
N/C
2,339.73
Extended Amt .
l-4.07
l4.07
2,353.80
200.08
2,553.88
Billing period: 28 Days From 5/17/23 03:30 PM Thru 6/14/23 03:30 PM Btfectiv• January l, 2021 and where p•naitted. by law, united Re!lt•ls may impoaa a aurctiarge of 1.8\ tor credit card P•~nte on c}large accounts. Thia aurcha1"9• ii uot greater than our merch..,t discount rate for credit card tranaactiona Eld ia sulljact to &ale& tax in aome jurildiction•-
llfOTlClh Thia i,ivoica is 1ubjact to th• tenaa and. conditiou of tbe R911tal and. service Agra-.it, 'llhic:ll are available •t ..... --.n- ,..,4-, .. ,. .. -ui■ . .,om/1 ..... 1/r&Dtal-aervtc:a-tax:m,-tJs aid whicl1 1u:·e incorporated h•r•i11 by %"eferenca. A COPr or THB JUmTAL
CALTRANS ROW
CITY OF VISALIA DATE: 7/11/2023
VR0337 DWR DATE: 5/24/2023 SOS 5/23/23
AREA DWR NO.: 142427
CONTRACTOR REPORT NO. Rpt 4
CR NO.: 63.01
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 0.87 0.15 429.76$ 2 MV521 F-250 XL REGULAR CAB, VPUT [TRUCK] T&TT 20-28 8 34.49 $ 0.87 0.15 275.92$ 3 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 0.86 0.15 60.88$ 4 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 0.87 0.15 199.84$ 5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 966.40$
15% Markup 144.96$
Total Equipment 1,111.36$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 7161032 MD 5/31/2023 1 $ 2,283.43 S $2,283.43
11 59523 KRC SAFETY CO INC 6/8/2023 1 $ 2,195.00 S $2,195.00 12 213602575-007 UNITED RENTALS 6/1/2023 MINI EX +TRAILER 1 $ 127.69 R $127.69 13 14
15 Subtotal Material, Subs, and Rentals 4,606.12$
15% Material Markup -$
10% Sub/Specialists Markup 447.84$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 5,073.12$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-GF GEN FORMAN MARK LYONS 54.38 $ 27.98 $ 0.11 8 81.56$ 28.80 $ 0.11 979.99$ 100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 8 75.04$ 28.60 $ 0.11 920.31$ 100-A4 A4-60% ANDRES A AVENDANO 26.83 $ 22.29 $ 0.11 8 40.25$ 33.44 $ 0.11 654.34$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 2,554.65$
35% Mark Up 894.13$
Total Labor 3,448.77$
SUBTOTAL 9,633.25$
-$
9,633.25$ T OTAL COST THIS REPORT
In
voice Description
MD CONCRETE CUTTING
TRAFFIC CONTROL
DESCRIPTION Start of Shift 5/23/23 Remove Trench plates for MD to demo asphalt #1.2 lanes on Locust A-C Electric Company
CUSTOMER
REFERENCE
A-C JOB NUMBER
CUSTOMER JOB #
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 May\Revisions\CR 63.01 May EWBPrinted 2/7/2025 I I I
./l-e cleobzk e� -CALIFORNJAC-10LICENSE99849
ENGINEERING-CON STRU CTI ON-TECH NO LOGY-SE RV ICE
Daily Work Report
DWR #: 142427
Submitted By: MARK R LYONS on 5/24/2023 5:05:46 AM
Job /Work Order Number
VR 0337
Date
2023-05-24
CCONo _/Area
Required for Mand Rjobs
CR63_01
Site/Location
Court and locust
Division
Visalia
Description of Work
Job Name
DOWNTOWN STREET LIGHTS
Job Home Local
100
P.O.Number
Customer
CITY OF VISALIA
Local Reporting To
100
Quote or T&M
0 Quote
Work Completed?
0 Yes & No
&T&M
Remove trench plates for MD to demo asphalt #1,2 lanes on locust and court #2,3. Place trench plates back after demo .
Employees
Technician Dispatch Time End Time Class ST OT OT TT
MARK R LYONS 08:00 PM 04:30AM GF 0 8 0 0
ROBERTO ZAVALA 08:00 PM 04:30AM F 0 8 0 0
ANDRES A AVENDANO 08:00 PM 04:30AM A4 0 8 0 0
Materials
Adders
0 0
0 Qty UOM Material Vendor/Truck Stock Packing Slip No.
0 None
Equipment
A-C Owned/Rental Hours A-C Eq. #/Rental Agency Miles Equipment Description A-C Owned 8 MV653 0 Hwy truck
A-C Owned 8 MV 521 0 Cone truck
A-C Owned 8 5154 7 0 Light tower
Rental 8 10595 346 0 Mini ex
Rental 8 10949061 0 Trailer
A-C Owned 8 MV 54 1 0 Foreman truck
Verd
0 0
0 Subcontractors
Ticket No.
258993
259490
Approved By
Customer Representative ...
Kirk Grier
Completed By
Field Representative. ..
Mark Lyons
2 MD demo
KRC
MD
Company
Demo asphalt
Traffic control 10hrs
Saw cutting
Customer Signature
��
Field Signature
Subcontract - Direct Job Item
-
Add Signers
Yes
,;:;.et:��
Lie. 99849
0 5/23/23
$2283.43
11003 W. Goshen Ave
Visalia, CA 93291
(559) 651-4200 fax (559) 651-4202
Invoice
Date:
American Incorporated dba Invoice No.:
5/31/2023
7161032
MD Concrete Cutting and Demolition
Lic#951204
Bill to: A-C ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380
Service at: A-C ELECTRIC
LOCUST & OAK
VISALIA, CA
Description: Work Order 5178445 MD VISALIA Customer lD:1034300 Work Order ID Salesperson
5178445 MD-DARWIN
Description of Work
Work Done 5/21-24/23
Saw 20.75HRS @$175/HR $3,631.25
Laborer 16.25HRS@ $125/HR $2031.25
Bobcat 16.25HRS @ $195/HR $3,168.75
Mobility 2.5HRS@ $120/HR $300.00
Qty Item Description
1.00 0
SAWCUT & DEMOLITION
Labor
PO Number Terms
VR0337 Net 30
Unit Price
9,133.75
Hourly Rate
When paying, please reference invoice number on remittance.
Remit to the address indicated on letterhead. 1.5% monthly finance fee may be assessed on balances over 30 days old. *All prices shown already include a 3% discount for cash/check payment. Credit Card payments-add 3% Quoted Prices include all applicable sales/use tax.
\\SAGE22\Timberline Office\9.5\Accounting\Report\Service Management\involce.rpt Subtotal:
Total Due: .. 8111mg Cleric
To pay by credit card, scan the QR
code with your smart phone camera.
Customer#: 1034300
Invoice#: 7161032
Called in By
MARK
Ext Price
9,133.75
Ext Price
9,133.75
9,133.75
emarquez
TRAFFIC CONTROL~ SAFETY SUPPLIES~ EQUIPl\1:ENT RENTAL~ TRAFFIC DESIGN Invoice
5.A.FETV co_.,. INC .
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 FaJ....-# 559-732-2684
Bill To
Date
6/8/2023
Job Info:
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-0 I/CITY OF VISALIA DOWNTO\VN ST LIGHT
VISALIA
VR0337
P.O. No. Terms Due Date Ordered By:
VR0337 Net 30 7/8/2023
Date Item Description Quantity Rate
05/21/2023 2 man 001 2 man lane closures - 1-8 hour shift I 1,555.50 05/21/2023 Overtime Overtime - Per hour (8-12 hours) 3 115.00 05/21/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 1 75.00 05/22/2023 2 man 001 2 man lane closures - 1-8 hour shift I 1,555.50 05/22/2023 Ove1time Overtime - Per how· (8-12 hours) 4 115.00 05/22/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 2 75.00 05/23/2023 2 man 001 2 man lane closures - 1-8 how- shift l 1,555.50 05/23/2023 Overtime Overtime - Per hour (8-12 hours) 4 115.00 05/23/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 1 75.00 05/24/2023 2 man 001 2 man lane closures - 1-8 hour shift I 1,555.50 05/24/2023 Overtime Overtime - Per hour (8-12 hours) 3 115.00 05/24/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 2 75.00 05/25/2023 2 man 001 2 man lane closures - 1-8 hour shift I 1,555.50 05/25/2023 Overtime Overtime - Per hour (8-12 hours) 6 115.00 INDEMNITY AGR.EEMENT. All Item:::: covcr-cd by thi:; Document =:;:h�II be �t thc :::ole rl:::k of Sales Tax (8.5%) the Cu:::-tomi:,.-. Cv�t:omc:,.- :o,;rec=:;: to defer'\d ., indemnify :ond hold h.orml c�:::; KRC SAJ=cl'"V ¢0 ... l,::s: offic:c� .. dlr�ct:Or'!;. �nd employee:::., fr'om :ond ;es:;�in�t On y ond nn 113.bl llt:-y cl:oim:;.,. J udi:mc:.nt:::., c:osts., �t torn,ey fe<t::.�, or dcrnl:lnd:;; of Uti�tl on :oriS-1 ne: f-rom "t:hc u:::c:., nn,1 ni::en:t:ance,. opcrz,tion ... or po:;:::c::;$1 on of the c:Quipmc:nt incl udi ns: but no't tlmltcd to ... tho:!.c �d�ns: tTom the �«Ive ncc_lJ s:;:cnce of Kf:\C SA.F ETV CO.,. ,1:::;. offl cc� .. dlr-ceto� :;:,nd employee:;., 'fr-om lr"IIJUr'Y to or dc�th of the Cu:;-t;ome:..- .. C1,.1:::tome�::: cmplcye-c:::., or �ny other &:,cr!:on, or from d�m�s::c. 'CO �ny property, :!.ave and cxc:epc the:r-c :;h�II be: no ob ll�tlon on the part of Total the: Cvstorner � d efcnd., Indemnify �r"td hold ho,rmle:!.:!. Ki:tC SAFETY CO., I� officc-1"'$., dlrccto.--s ... ::,nd c:rni:,I oyc c:::.: ... if the lt�bHlt.y,. c:l.:sJ n'I:; ... Jvd1trncnt:: .. co::.:� �ttorncy� 1-ce:!.., or de:m:=,nd-:: of lltl ptlon othe..-wi::::e 1;.ivln,:_ 11�,e to :::uch obll$:'Otlon .nn$c +rom th<e :::ole ncs:.lls::cnc.c or"wlllf'ul rnt:!.conduct of KRC SAFETY co . ., Payments/Credits Its offlc:l!!rs,. d1rcctor-s, :;:,nd employees. If Custon"lcr r-t=fU:$CS to d efcnd., I nde:rnnlfy �nd hold h:o,.-ml c!;s KRC SAFETY CO.,.. It!'; officer:.: ., dlrccto� ... �nd ernplo-yccs and sub!-: c:: Qucn tly :a, do:-1:crrnin�t.fon I� m.:,dc: that:
11::ibllll:y 1:: not: due to the ::=olc ncs:jlgcncc Or"wlll'FuJ mt::;conduct of KRC SAFETY co._ le::, officer-,. dTrector:: .. <!Ind em_pl0ycc::,. Cu�orne:r ,� obfl�·te:d t:o relmbv�c :ony :and :all lJ�blllt:y,. dalrns:,.Juduncnt=:;,. co,:� Balance Due attor-ney� fee:!.,. or- dcm::-nd� of- llU�Uon lncun"'cd by K.l=tC SFAETV CO.,. lb officers .. directors .. �nd employee::. C.....::;torner �E.rc-c::; to notify KRC SAFETY CO., 1rnrncdi:otcly ln e-::..::<: of �ny :=,eel dcr"llt: bnd to ob�1 n the n�mc:;., �ddrc:�::e':!.,. t:el 1!'!:phon,e number":; ;:,nd ot-hcr'" pc..-.:1 ncni= I nfon-n3tlon f'ron"I .:!tll p::!il"U ie::
Involved �nd all V\l\"t:nc:=:s:c::=.
Invoice#
59523
Amount
1,555.50
345.00
75.00 1,555.50
460.00
150.00
1,555.50
460.00
75.00 1,555.50
345.00
150.00
1,555.50
690.00
$0.00
$10,527.50
$0.00
$10,527.50
I
I I
1 Day
Total $127.69
4 WEEK BILLING OUnited Rentals·
BIWfC!I' 6f.1 JUNO 9 3123 INVOICE
935 Jro.i!Tl! SKN JIADDOX PlAr
vrBALI'A CA !13Z9Z-6620
55!1•6.Z1-51J..Z
_3 A-C ELECTRIC VISALIA BRANCH
...t 1035 W MURRAY AVE
Dl VISALIA CA 93291-4721
~ Office: 661-410-0000 Cell: 559-679-7286
7.1.~11 MB 0.528 81085S21.p01 288171 1-2 o
111Mn1111111h1l1111111hrll1111 11l111•fllh111t11rul1ll1fl,I
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS:
~ Bguipment Description
l 10949061·· TRAILSlfTILT 12•-'i6•TO 9;99~JC'l'ANm!M
Make: TOW MASTER Model: T-9DT 16 1
Seri~l: 4KNBT232SKL162613
l 10595346 MINI EXCAVATOR 7400-9199#
Make: TAKEUCHI Model; TB240
Minimu1r1
Serial: 124002620 Meter out: 1435.80 Meter in: .oo
1 907/0525 MINI EXCAVATOR BUCKET 12"
SALES/MISCELLANEOUS ITEMS:
_ __.Q'-'-t..,_y Item
1 CA PERSONAL PROP TAX REIMB CHARGB
COMMENTS/NOTES:
CONTACT: JOB MERCADO
CELL#: 559-556-5783
[DRSORCA/MCI J
# 13
: 156339 Cuatomer #
Invoice Date
Date out
Billed Through
11.R Job Loe
: 06/01/23
1 11/30/22 03 ;30 PM
: 06/14/23 00: 00
UR Job It
Cuatcmer Job
p .o .•
R•queated By
Reserved By
Sale•parson
: 1035 W MURRAY AVE, V
: 430
ID;
: VR0337
: JOE MERCADO
1 CLIFFGENESIS SALUDEZ
: BRYN WHITE
• - --,
Invoice Amount; $2,553.88 ~
Terma: Due Upoo ReoGlpt
P&l'fflOOI optlOna; Contlcl OIi' cnlC.1t office 704-ilt6-4817 REMIT TO: UNITED RENTALS (NORTH AMEA!CA),INC.
P.O. BOX 05112'2
LOS ANGELES CA90074•1122
Day Week 4 Week
312.00 1,034.00 1,876.00
Rental Subtotal:
Price Unit of Meaeure
14.070 EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
TOtal:
Amount
4133. 73
1,876.00
N/C
2,339.73
Extended Amt .
l-4.07
l4.07
2,353.80
200.08
2,553.88
Billing period: 28 Days From 5/l?/23 03:30 PM Thru 6/14/23 03:30 PM Btfectiv• January l, 2021 and where p•naitt~ by law, united Re!lt•ls may impoaa a aurctiarge of 1.8\ tor credit card P•~nte on c}large accounts. Thia aurcha1"9• ii uot greater than our merch..,t discount rate for credit card tranaactiona Eld ia sulljact to &ale& tax in aome jurildiction•-
llfOTlClh Thia i,ivoica is 1ubjact to th• tenaa and. conditiou of tba Re11tal and. service Agra-.it, 'llhic:ll are available •t ..... --.n- ,..,4-, .. ,. .. -ui■ . .,om/laaal/r&Dtal-aarvtc:a-tax:m,-tJs aid whicl1 1u:·e incorporated h•r•i11 by %"eferenca. A COPr or THB JUmTAL
CALTRANS ROW
CITY OF VISALIA DATE: 7/1/2023
VR0337 DWR DATE: 5/25/2023 SOS 5/24/23
AREA DWR NO.: 142445
CONTRACTOR REPORT NO. Rpt 5
CR NO.: 63.01
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 0.87 0.15 429.76$ 2 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 0.86 0.15 60.88$ 3 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 0.87 0.15 199.84$ 4 - $ - $
5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 690.48$
15% Markup 103.57$
Total Equipment 794.05$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 213602575-007 UNITED RENTALS 6/1/2023 1 $ 127.69 R $127.69 11 212670954-008 UNITED RENTALS 6/2/2023 1 $ 187.96 R $187.96 12 7161032 MD 5/31/2023 1 $ 2,283.43 S $2,283.43
13 59523 KRC 6/8/2024 1 $ 2,050.50 S $2,050.50
14 133337 STONEYS 5/22/2023 1 $ 87.43 M $87.43
15 Subtotal Material, Subs, and Rentals 4,737.01$
15% Material Markup 13.11$
10% Sub/Specialists Markup 433.39$
15% Eq Rental Markup 47.35$
TOTAL MATERIAL, SUBS, and RENTALS 5,230.87$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-GF GEN FORMAN MARK R LYONS 54.38 $ 27.98 $ 0.11 8 81.56$ 28.80 $ 0.11 979.99$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 2 66.35$ 28.34 $ 0.11 210.20$ 100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 8 75.04$ 28.60 $ 0.11 920.31$ 100-A4 A4-60% ANDRES A AVENDANO 26.83 $ 22.29 $ 0.11 8 40.25$ 33.44 $ 0.11 654.34$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 2,764.85$
35% Mark Up 967.70$
Total Labor 3,732.54$
SUBTOTAL 9,757.46$
-$
9,757.46$ T OTAL COST THIS REPORT
A-
C JOB NUMBER
CUSTOMER JOB #
DESCRIPTION
A-C Electric Company
CUSTOMER
REFERENCE
Start of Shift 5/24/23 Remove trench plates and reinstall. Added trench plates as needed and cold patch., Demo Asphalt #1 lane court from Mineral King to oak 8 locations and #3 lane Locust from Oak to Mineral King.
Invoice Description
MINI EX +TRAILER
10 K FORK LIFT
MD CONCRETE CUTTING
TRAFFIC CONTROL
COLD MIX
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 May\Revisions\CR 63.01 May EWBPrinted 2/7/2025 ./1-e e� e� -CALIFORNIAC-10LICENSE99849
ENGINEERING-CONSTRUCTION -TECHNOLOGY-SERVICE
Daily Work Report
DWR #: 142445
Submitted By: MARK R LYONS on 5/25/2023 4:42:17 AM
Job /Work Order Number
VR 0337
Date
2023-05-25
CC O No./Area
Required for Mand Rjobs
CR63.01
Site/Location
Court and locust
Division
Visalia
Description of Work
Job Name
DOWNTOWN STREET LIGHTS
Job Home Local
100
P.O. Number
Customer
CITY OF VISALIA
Local Reporting To
100
Quote or T&M
0 Quote
Work Completed?
0 Yes & No
&T&M
Remove trench plates and re install. Added trench plates as needed and cold patch. Demo asphalt #1 lane court from mineral king to oak 8 locations and #3 lane locust from oak to mineral king.
Employees
Technician Dispatch Time
MARK RL YONS 08:00 PM
KEVIN LA NDRADE 08:00PM
ROBERTO ZAVALA 08:00 PM
ANDRES A AVENDANO 08:00 PM
Materials
Qty
3 4
4 .5
UOM Material
3/4"x4'x10' trench plates
3/4"x4'x8' trench plates
3/4"x4'x4' trench plates
Yards cold mix
End Time Class ST
04:30AM GF 0
04:30AM J
·�
04:30AM F 0
04:30AM A4 0
Vendor/Truck Stock
Vendor
Vendor
Vendor
Vendor
OT DT TT Adders Verd
8 0 0 0 0
2 0 0 0 0
8 0 0 0 0
8 0 0 0 0
Packing Slip No.
Equipment
A-C Owned/Rental Hours
A-C Owned
Rental
Rental
A-C Owned
Rental
A--C OLD subcontractors
Ticket No.
258998
Approved By
Customer Representative ...
James Grier
Completed By
Field Representative ...
Mark Lyons
2 8
8 8
8 2
Company
MD demo
KRC
A-C Eq. #/Rental Agency Miles Equipment Description
MV653 0 Hwy truck
10949061 0 Trailer
10595346 0 Mini ex
51547 0 Light tower
11041557 0 10k grade al I
Subcontract - Direct Job Item
Demo asphalt on locust #3 lane and court#1 lane
Traffic control 9hrs
Customer Signature
c�
Field Signature
?�--
Add Signers
Yes
/1./J [:l,,d,,,ic l?o,,,.pc;-r-'f
Lie. 99849
0 1 Day
Total $187.96
JUND!I D3 -. .............. , ..., .......... '-"
INVOICE
300 N TIPTON
300 N TIPTON ST
VISALIA CA 93291
Officei 661-410-0000 Cell: 559-556-5783
7.1.2961 I MB0.52& B1630S21.p0l 271744 1-3 O
•l111IH1t11 •111• •1111111111 rll Hu •1• 1 lh 'hh 11111111••PIIP11
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
# 212670954-008
CUstamer # : 156339
Invoice Date : 06/02/23
Date Out : 11/03/22 07:00 AM
Billed Tbrough: 06/15/23 00:00
lJ'R Job Loe : 300 N TIPTON ST, VIS
OR Job I : 652
Cuatome:t" Job IDI STREET LIGHTS
P.O. f I VR0337
Req\leated By : JOE MERCADO
Reaerved By l BRYN WHITE
Sala•per■OQ I BRYN WHITE
Invoice Amount: $3,759.30
Tennt: Ou!t Upon Reoelpl
Payrnentopllon8-. eontai:tourcredtofflco 704-91&-4877
REIIJTTO: UNITT:D RENTALS (NORTH AMERJCA),JNC.
P.O. BOXOS1122
LOS ANGELES CA 90074-1122
il.ENTAL ITEMS:
~ Equipment: ___ ne....;;...11_c:,:_r;;..;i""p'-"tc::ic::oc::nc......-:--._-.--.-. _______________ -""'.~:-=inc::i...;m.c.u;;;cm:;__ ___ :.Da::.Y;i__ __ _::W:.::e:.::e!!:k __ _:4:_.::W:,::e:::e:.!:k~ -----=Amowl==:::::t:--1 1 11041557 FORKLIFT VARIABLE RBACH 10000# 50 1 & OP 4.27. 00 Make: JCB Model: 510-56
Serial: 2929479 Meter out: 1819.00 Meter in: .00
3ALBS/MISCBLLANBOUS ITEMS:
_ ___.Q'-=t~y Item
l CA PERSONAL PROP TAX RBIMB CHARGli:
:OMMENTS/NOTES:
CO?ITACT: JOSEPH MERCADO
CELL#: 559-556-5783
DLV/PKO LOC SBLBCTBO B'i MAP PIN OPTION
[DRSURCA/MCIJ
4.27.00 Price
25.793
Billing period: 28 Days From 5/18/23 07:00 AM 11>ru 6/15/23 07:00 AM TO SCHEDULE EQUIPMENT FOR PICKUP, CALL 800-UR-RENTS (800-877-3687) WE ARB AVAILABLE 24/7 TO SUPPLY YOU NITH A CONFIRMATION#
IN ORDER TO CLOSE THIS CONTRACT
l., 561. 00 3,439.00
Rental Subtotal:
Unit of Measure
EACH
Sales/Misc subtotal:
Agreement Subtotal:
Tax:
Total:
3,439.00
3,439.00
Extended Amt.
25.79 25 . 79
3,464.79
294.51
3,759.30
&ffll0tive January l, 2021 and "11ere peraitted by law, UX!ited 114mtal. ■ nay impoH a ■urcharg• of 1.n, for credit card payiunta on cbarv• account■, Thi ■ •urcha~e ia not greater than wr aerchallt cli ■ count rate for credit card trax111acti01:1 ■ 1111d i ■ aubject to aal•• tax in ■ om• juri•dietiou■•
lfOTICZ: Thi■ iuvtiice ia •ut>j.ct to tb.e t•nas and coiiditio11& of tbe ReDtal. and servic ■ ~•-t, which ar• availlll:>l• at httpa,//www.unitedrentala.com/l.agal/rental-aervic~-i:.rms-US and which are incorporated nerein by raferezu:111. A COPY OF TllB .RllNTAI.
ARD SBRVICB AORlUDCBNT TUXS 1,JIJi. AVAILAIII.11 Ill PAli'D rollM l;fPOS DQOaS'l'. 5/24/23
$2283.43
11003 W. Goshen Ave
Visalia, CA 93291
(559) 651-4200 fax (559) 651-4202
Invoice
Date:
American Incorporated dba Invoice No.:
5/31/2023
7161032
MD Concrete Cutting and Demolition
Lic#951204
Bill to: A-C ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380
Service at: A-C ELECTRIC
LOCUST & OAK
VISALIA, CA
Description: Work Order 5178445 MD VISALIA Customer ID: 1034300 Work Order ID Salesperson
5178445 MD-DARWIN
Description of Work
Work Done 5/21-24/23
Saw 20.75HRS @$175/HR $3,631.25
Laborer 16.25HRS @$125/HR $2031.25
Bobcat 16.25HRS @ $195/HR $3,168.75
Mobility 2.5HRS@ $120/HR $300.00
Qty Item Description
1.00 0
SAWCUT & DEMOLITION
Labor
PO Number Terms
VR0337 Net 30
Unit Price
9,133.75
Hourly Rate
When paying, please reference invoice number on remittance.
Remit to the address indicated on letterhead. 1.5% monthly finance fee may be assessed on balances over 30 days old. *All prices shown already include a 3% discount for cash/check payment. Credit Card payments-add 3% Quoted Prices include all applicable sales/use tax.
\\SAGE22\limberline Office\9.5\Accounting\Report\Service Management\invoice.rpt Subtotal:
Total Due:
B1ll1ng Clerk.
To pay by credit card, scan the QR
code with your smart phone camera.
Customer#: 1034300
Invoice#: 7161032
Called in By
MARK
Ext Price
9,133.75
Ext Price
9,133.75
9,133.75
emarquez
TRAFFIC CONTROL~ SAFETY SUPPLIES ~ EQUIPMENT RENTAL~ TRAFFIC DESIGN Invoice
!!5i.AFETV CCI_.,. INC .
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fax'# 559-732-2684
Bill To
Date
6/8/2023
Job Info:
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALIA
Date
05/21/2023
05/21/2023
05/21/2023
05/22/2023
05/22/2023
05/22/2023
05/23/2023
05/23/2023
05/23/2023
)5/24/2023
)5/24/2023
)5/24/2023
05/25/2023
05/25/2023
P.O. No.
VR0337
Item
2 man 001
Overtime
AITOwboard - A. ..
2 man 001
Overtime
Arrow board - A. ..
2 man 001
Overtime
Arrowboard - A. ..
2 man 001
Overtime
Arrowboard - A. ..
2 man 001
Overtime
VR0337
Terms Due Date
Net 30 7/8/2023
Description
2 man lane closures - 1-8 hour shift
Overtime - Per hour (8- I 2 hours)
Additional arrow board(s) per shift (includes lane)
2 man lane closures - 1-8 hour shift
Overtime - Per hour (8-12 hours)
Additional a.1Tow board(s) per shift (includes lane)
2 man lane closures - 1-8 hour shift
Overtime - Per hour (8-12 hours)
Additional arrow board(s) per shift (includes lane)
2 man lane closures - 1-8 hour shift
Overtime - Per hour (8-12 hours)
Additional arrow board(s) per shift (includes lane)
2 man lane closures - 1-8 hour shift
Overtime - Per hour (8-12 hours)
INDEMNITY AGREEMENT . .A.11 lt:er"n:::: covered by t.hi:;:: 0oc:vrnc-nt ::::h:;:i.11 be ::,t the ::::ole r'i�k of Quantity
the Cv.::to mer. Cu::::'t'o mer ::.s:.rc c:::: to defend .. i ndcn-,ni ,fy and hold h::>r-r"nl c::::::: KRC SAFETY CO ... it:::: otti c.cr.::: .. dlrcc:t:or:::. tJond em pl oyec::::., from ;:,nd a g.ai n::::t :;!,n y and all liabl li ty ci::sl n-,::::,. J ud�n-,cnt.::,. C0$1:::::,. attorn� fc c::::,. or dcn,�nd:; of liti :&:;.:.,tion .:.,ri::::J nsr;frorn the: u:::::c ,. n-,::,l nt.enancc .. opcr..-,t.ion,. or po.:::;:c.:::::;ton of the cQvip,-nent i"'cl vdln,i: but not Hr"nltcd to ,. tho:::c ::,rJ:;..Jnc frorr-, the ;:,ct.Iv,: nc£11:ccnc.c of KRC SAF ETV CO ... it:;;: offic.cr.::,. di,..ec:tor:::. and crnpl oYee:::;., from injury to or dc.:ith of the Cu:::tomcr., Cu::::tomcr"::: cmpl oycc,::;., or ::.n y other per.::::on., or from d:arn� �c to any prope rty., :::ave :a.nd except there :::;hall be no oblig;:itlon on the p.:,rt of the Cu::::torncr to defend ., i nder-nnify :c,nd hold harrnlc:::;::; KRC SAFETY CO ... Its officer:::., directors,. �nd crnpl oyc c,::;., 11= the I l�blll fy., cl::.1 m:::: .. j udJi:rncnt::::.,. co:::t::: attorn c-y::: fee::., or dcrn::,nd:::: of lltl �t• on othel""VV'i ::::c s;:_ivi ns.:. n::::c to :::uch obliZot:.i on ::,ri:::;e frofT'I the ::::ole ,-.e i,:I I J:cncc orwillfu.l rni::::c:onduc,.: of KRC SAFETY CO ... lt:::; offic-:� .. director::::., ;:)nd crnploycc:::;. 11- C.....::::1:orncr refuses to defend ,. i ndcfT'lnlfy and hold h;:,rrnle:::::::: K RC SAFETY CO.,. It:: offl ccr,;,. dlrc.c:tor:::;,. J:tnd c.m ployc-:::::: ::,nd :::ub::::c Quently :c, deter mi natl on I:;: made th:c,t
11.::ibilit;y 1:::: not due to the ::::ol c ncz,.lig_cncc or willful rni�onduct of KRC SAFETY CO., It:::. officer ,. director:::: .. .:ind crnplo yce::::,. Cu::::torner J:::; obll g;:,tcd to relrnbur::::e ;::iny ::,nd .::ill 11::iibllity,. cl :airns,. Judi;:rnents., co :::� attorney::;: .fees,. or defT'land:::: of litf:s::::;iition incun-cd by KRC SFAETY CO.,. it!': officer,; ,. director.;:., and cmploycc::::. Cu::::tomcr .::.c.rc,c:::: to notify KRC SAFETY CO . ., lrn rn-cdJ:e,tcly in c:::,::::e of �ny :>eel dent ::,nd to obt::.I n the n3mc:::: .:iddrc::::::::c::;: tel cphonc nu rnber::;: �nd other pcf"'1:i ncn t i nforr-n::?sti on from :all p�r"'t:i c::::
Involved and �II v.A-enc:::.:::::e::::.
Ordered By:
Rate
I 1,555.50
3 115.00
I 75.00
I 1,555.50
4 115.00
2 75.00
I 1,555.50
4 115.00
I 75.00
I 1,555.50
3 I 15.00
2 75.00
I 1,555.50
6 115.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59523
Amount
1,555.50
345.00
75.00 1,555.50
460.00
150.00
1,555.50
460.00
75.00 1,555.50
345.00
150.00
1,555.50
690.00
$0.00
$10,527.50
$0.00
$10,527.50
.5 yards=1 ton
Total $87.43
BILL TO:
A-C Electric Company
Headquarters
P.O. Box81977
STONEY'S SAND & GRAVEL, LLC
9181 HIGHWAY 41
LEMOORE, CA 93245
559.924.9229
559.924.7834 Fax
Bakersfield, CA 93380-1977
.. . - .. -
P.O. NUMBER TERMS REP SHIP VIA
VR0337 I
Net30 JL 5/22/2023 I
----.-L- __ _ _1_ ____ ·-·--
INVOICE
JUNO t Bl DATE INVOICE#
5122/2023 133337
SHIP TO:
A-C Electric Company
300 N Tipton Street
Visalia, CA 93277
F.0 .B. PROJECT
QUANTITY ITEM CODE DESCRIPTION PRICE EACH AMOUNT
----- -- -\--- - --+-- ---
8 I TON /034 I Cold Mix ,...~---107.29 858.32T
Delivery Tag#: 788006
l,,r
/ 8 I TGN/034f ., [ Cold Mix/ Freight Only ·• ·• . -~ ' .,. ,t. 41.50 , "'I.Jc:~ ·:·;.r "332)00 '
1 .,:!'~ DEL CHRGNISA.1 Seli'Wry ChargeMsalia- ,~ .. . ;~ ~- ~ ~ 125.00 I· 125.00T .... . ... fi10# VR0367-CR63·0"1 ., :f,. ~ - ·l!JI·,;. .,i •.;f . .. ,._ I ..... ....... _ "< -
Visalia City Sales Tax 8.50%
I
83.58 l \
I
Thank You! We: Appreciate YoLlr Busincs.,;!
Note: Invoice paid by credit card wm han: a 4% proccssin fee.
Title to materials passes to purchaser at time end place of shipment. TOTAL $1,398.90 ---------- --------- ~ ___ _,___ __ - ·-·- -
1 Day
Total $127.69
4 WEEK BILLING OUnited Rentals·
BIWfC!I' 6f.1 JUNO 9 3123 INVOICE
935 Jro.i!Tl! SKN JIADDOX PlAr
vrBALI'A CA !13Z9Z-6620
55!1•6.Z1-51J..Z
_3 A-C ELECTRIC VISALIA BRANCH
...t 1035 W MURRAY AVE
Dl VISALIA CA 93291-4721
~ Office: 661-410-0000 Cell: 559-679-7286
7.1.~11 MB 0.528 81085S21.p01 288171 1-2 o
111Mn1111111h1l1111111hrll1111 11l111•fllh111t11rul1ll1fl,I
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS:
~ Bguipment Description
l 10949061·· TRAILSlfTILT 12•-'i6•TO 9;99~JC'l'ANm!M
Make: TOW MASTER Model: T-9DT 16 1
Seri~l: 4KNBT232SKL162613
l 10595346 MINI EXCAVATOR 7400-9199#
Make: TAKEUCHI Model; TB240
Minimu1r1
Serial: 124002620 Meter out: 1435.80 Meter in: .oo
1 907/0525 MINI EXCAVATOR BUCKET 12"
SALES/MISCELLANEOUS ITEMS:
_ __.Q'-'-t..,_y Item
1 CA PERSONAL PROP TAX REIMB CHARGB
COMMENTS/NOTES:
CONTACT: JOB MERCADO
CELL#: 559-556-5783
[DRSORCA/MCI J
# 13
: 156339 Cuatomer #
Invoice Date
Date out
Billed Through
11.R Job Loe
: 06/01/23
1 11/30/22 03 ;30 PM
: 06/14/23 00: 00
UR Job It
Cuatcmer Job
p .o .•
R•queated By
Reserved By
Sale•parson
: 1035 W MURRAY AVE, V
: 430
ID;
: VR0337
: JOE MERCADO
1 CLIFFGENESIS SALUDEZ
: BRYN WHITE
• - --,
Invoice Amount; $2,553.88 ~
Terma: Due Upoo ReoGlpt
P&l'fflOOI optlOna; Contlcl OIi' cnlC.1t office 704-ilt6-4817 REMIT TO: UNITED RENTALS (NORTH AMEA!CA),INC.
P.O. BOX 05112'2
LOS ANGELES CA90074•1122
Day Week 4 Week
312.00 1,034.00 1,876.00
Rental Subtotal:
Price Unit of Meaeure
14.070 EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
TOtal:
Amount
4133. 73
1,876.00
N/C
2,339.73
Extended Amt .
l-4.07
l4.07
2,353.80
200.08
2,553.88
Billing period: 28 Days From 5/17/23 03:30 PM Thru 6/14/23 03:30 PM Btfectiv• January l, 2021 and where p•naitted. by law, united Re!lt•ls may impoaa a aurctiarge of 1.8\ tor credit card P•~nte on c}large accounts. Thia aurcha1"9• ii uot greater than our merch..,t discount rate for credit card tranaactiona Eld ia sulljact to &ale& tax in aome jurildiction•-
llfOTlClh Thia i,ivoica is 1ubjact to th• tenaa and. conditiou of tbe R911tal and. service Agra-.it, 'llhic:ll are available •t ..... --.n- ,..,4-, .. ,. .. -ui■ . .,om/1 ..... 1/r&Dtal-aervtc:a-tax:m,-tJs aid whicl1 1u:·e incorporated h•r•i11 by %"eferenca. A COPr or THB JUmTAL
CALTRANS ROW
CITY OF VISALIA DATE: 11/7/2024
VR0337 DWR DATE: 5/31/2024 SOS 5/30/23
AREA DWR NO.: 142504
CONTRACTOR REPORT NO. Rpt 6
CR NO.: 63.01
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 2.5 53.72 $ 0.87 0.15 134.30$ 2 - $ - $
3 - $ - $
4 - $ - $
5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 134.30$
15% Markup 20.15$
Total Equipment 154.45$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 133337 STONEYS 6/1/2023 1 $ 43.71 M $43.71
11 220227053-002 UNITED RENTALS 5/31/2023 1 $ 440.06 R $440.06 12 13
14 15
Subtotal Material, Subs, and Rentals 483.77$
15% Material Markup 6.56$
10% Sub/Specialists Markup -$
15% Eq Rental Markup 66.01$
TOTAL MATERIAL, SUBS, and RENTALS 556.34$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-FMN FOREMAN Robert Zavala 50.03 $ 27.85 $ 0.11 2.5 75.04$ 28.60 $ 0.11 287.60$ 100-JW JOURNEYMAN Kevin Andrade 44.23 $ 27.68 $ 0.11 2.5 66.35$ 28.34 $ 0.11 262.75$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 550.35$
35% Mark Up 192.62$
Total Labor 742.97$
SUBTOTAL 1,453.75$
-$
1,453.75$ T OTAL COST THIS REPORT
In
voice Description
COLD MIX
SKID STEER + Trailer
DESCRIPTION Start of Shift 5/30/23 Cold mix around trench plates all areas on Court and Locust.
A-C Electric Company
CUSTOMER
REFERENCE
A-C JOB NUMBER
CUSTOMER JOB #
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 May\Revisions\CR 63.01 May EWBPrinted 2/7/2025 Daily Work Report
DWR #: 142504
Submitted By: MARK R LYONS on 5/31/2023 8:14:31 PM
Job/Work Order Number
VR0337
Job Name
DOWNTOWN STREET LIGHTS
Customer
CITY OF VISALIA
Date
2023-05-31
Job Home Local
100
Local Reporting To
100
CCO No./Area
Required for M and R jobs
CR63.01 P.O. Number
Quote T&M
Quote or T&M
Site/Location
Court and locust
Yes No
Work Completed?
Division
Visalia
Description of Work
Cold mix around trench plates all areas on court and locust.
Employees
Technician Dispatch Time End Time Class ST OT DT TT Adders Verd ROBERTO ZAVALA 04:00 AM 06:30 AM F 0 2.5 0 0 0 0
KEVIN L ANDRADE 04:00 AM 06:30 AM J 0 2.5 0 0 0 0
Materials
Qty UOM Material Vendor/Truck Stock Packing Slip No.
.25 Yards cold mix
Equipment
A-C Owned/Rental Hours A-C Eq. #/Rental Agency Miles Equipment Description Rental 2.5 11284060 0 Skid steer
A-C Owned 2.5 MV653 0 Hwy truck
Rental 0 10769783 0 Trailer
Subcontractors
Ticket No. Company Subcontract - Direct Job Item
Approved By
Customer Representative...
James Grier
Customer Signature
Yes
Add Signers
1 ./1-e c~ e~ - CALIFOR.NIA C-10 LICENSE 99849
ENGINEERING-CONST RU C Tl ON-TECHNOLOGY-SE RV ICE
I
Completed By
Field Representative...
Mark Lyons
Field Signature
Lic. 998492
.25 Yards=1/2 Ton
Total $43.71
BILL TO:
A-C Electric Company
Headquarters
P.O. Box81977
STONEY'S SAND & GRAVEL, LLC
9181 HIGHWAY 41
LEMOORE, CA 93245
559.924.9229
559.924.7834 Fax
Bakersfield, CA 93380-1977
.. . - .. -
P.O. NUMBER TERMS REP SHIP VIA
VR0337 I
Net30 JL 5/22/2023 I
----.-L- __ _ _1_ ____ ·-·--
INVOICE
JUNO t Bl DATE INVOICE#
5122/2023 133337
SHIP TO:
A-C Electric Company
300 N Tipton Street
Visalia, CA 93277
F.0 .B. PROJECT
QUANTITY ITEM CODE DESCRIPTION PRICE EACH AMOUNT
----- -- -\--- - --+-- ---
8 I TON /034 I Cold Mix ,...~---107.29 858.32T
Delivery Tag#: 788006
l,,r
/ 8 I TGN/034f ., [ Cold Mix/ Freight Only ·• ·• . -~ ' .,. ,t. 41.50 , "'I.Jc:~ ·:·;.r "332)00 '
1 .,:!'~ DEL CHRGNISA.1 Seli'Wry ChargeMsalia- ,~ .. . ;~ ~- ~ ~ 125.00 I· 125.00T .... . ... fi10# VR0367-CR63·0"1 ., :f,. ~ - ·l!JI·,;. .,i •.;f . .. ,._ I ..... ....... _ "< -
Visalia City Sales Tax 8.50%
I
83.58 l \
Thank You! We: Appreciate YoLlr Busincs.,;!
Note: Invoice paid by credit card wm han: a 4% proccssin fee.
Title to materials passes to purchaser at time end place of shipment. TOTAL $1,398.90 ---------- --------- ~ ___ _,___ __ - ·-·- -
1 Day
Total $440.06
-OUnited Rentals·
9.l .36231 MB 0.528 79958S21.p01 259152 2-2 0
2023 RENTAL RETURNlllNO 8 fa, INVOICE afd ~641
925 ~ 8D .laDDOX lllllJ'
VZSALIA CA 93Z$Z-66Za 559,U7-51l2
DOWNTOWN STREET LIGHTS
300 NORTH TIPTON STREET
VISALIA CA 93277
Office: 661-410-0000 Cell:
AC ELECTRIC CO BAKERSFIELD
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITBMS,
~ Equipment pescription
559-556-5783
CA
Minimum
# 220227053-002
: 156339 Cuatomer #
Invoice Date
Rental out
Rental In UR Job Lac
UR Job ft
Customer Job
P.O.#
Requeatad By
Reaened By
Sal••per•on
I 05/31/23
; 05/30/23
: 05/31/23
: 300 NORTH
: 632
03:00 PM
0B:44 AM
TIPTON STR
ID:
: \rR0031
: J'OE MERCADO
: DARRELL SISCO
r PATRICK CONNOR
Invoice Amount $440.06
.-............... ~·,···=
Tl!ffflS: [Wt.lponRICel,DI
Payment opuons: Contac1 OIJr credit C>ffiCII 704-918-18n REMIT TO: UNITED RENTALS (NORTH AMERICA),INC.
P.O. BOX 051122
LOS ANGELES CA 90074-1122
Week Amount
l 11284060 SKID STEER LOADER 2001-2599#
Make, BOBCAT Model : S64
Serial, B4SC13l24 Meter out:
344. 00
511.30 Meter in: 514.00
344.00 1,061.00 2,586.00 344.00
1 903/5073 SKID STEER BUCKET 7.i!" SMOOTH
1 10769783 TRAILER TILT 12'-16' TO 9,999K TANDEM
Make: MARKSMAN Model: RBETBOX16-99
Serial: 1R9BE162XJL846138
SALES/MlSCELLANEOOS ITEMS:
__ Qt_.y Item
1 CA PiRSONAL PROP TAX RBIMB CHARGE
COMMENTS/NOTES:
CONTAC'l': JOB MERCADO
CELL#: 559-556-5783
59.00 59.00
Price
[DRSORCA/MCI] 2.580
234.00 473.00
Rental Subtotal:
Onit of Measure
BACH
Sales/Misc Subtotal:
Ag~eem8nt Subtotal:
Tax:
Total:
N/C
59.00 403,00
Extended Amt.
2.58 2.58
405.56
34.48 440.06
- ---------- --------- ---t~--=--=...:::......::..-=-=-=-=-=-=-=-=_r--T~ Bffeetiva January 1, 2021 and 111'her• permitted by law, Ul:litad Rental ■ m■y i~o•• a s11rim.~ of l.81 ror er.41.t eard payment• on e~a al!eounta. 'rid ■ ■ urcbarg9, i ■ not gr .. ter thai> <>Ur aarchant di ■eount :i: ■ ta for cr9dit card t:i:ao ■ actiOl:111 and ia 1ul:l~act to ■ alas tax in ■ o,u juri ■ dieticn ■. ~ICII: '?'his invoic ■ is ■ ubjeClt to l:Jls tanu IQ:ld ~itJaizs er tlla Rc:tal &ild Bervie• Agr._. ■Dt, whicb ■ rs avail.tile •t htt~••//-.unit-41"-.itala.c-.llegal/irental- ■ ervtce-t ■ ra ■ -m;i and which ar ■ incorporated haratn by reference. A COl>Y or TBB RlbiTAL Ami SBRVICI AQUDUIT l'UkS ARI: AVUUBUI Ill P]41BR l'ORX UPOll IIBQUBST.
CALTRANS ROW
4/4/2016
VR0337 63.02
AREA
COST SUMMARY
Line Date DWR Quantity U Unit Price Amount
1 6/1/2023 SOS 5/31/23142520 1 E 13,644.14$ 13,644.14$ 2 6/2/2023 SOS 6/1/2023142538 1 E 15,987.02$ 15,987.02$ 3 6/5/2023 SOS 6/4/23142564 1 E 15,359.98$ 15,359.98$ 4 6/6/2023 SOS 6/5/23142608 1 E 19,907.54$ 19,907.54$ 5 6/7/2023 SOS 6/6/23142629 1 E 12,907.57$ 12,907.57$ 6 6/8/2023 SOS 6/7/23142654 1 E 17,376.27$ 17,376.27$ 7 6/9/2023 SOS 6/8/23142657 1 E 13,896.37$ 13,896.37$ 8 6/12/2023 SOS 6/11/23142715 1 E 19,011.28$ 19,011.28$ 9 6/13/2023 SOS 6/12/23142737 1 E 14,444.26$ 14,444.26$ 10 6/14/2023 SOS 6/13/23142749 1 E 3,083.00$ 3,083.00$ 145,617.43$
A-C Electric Company
CUSTOMER Date:CITY OF VISALIA
CR No.:
REFERENCE
CUSTOMER JOB #
A-C JOB NUMBER
Cost Summary Total
Printed 2/7/2025
I I I I I I
_______ 1 1
CALTRANS ROW
CITY OF VISALIA DATE: 7/25/2023
VR0337 DWR DATE: 6/1/2023 SOS 5/31/23
AREA DWR NO.: 142520
CONTRACTOR REPORT NO. Rpt 1
CR NO.: 63.02
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV521 F-250 XL REGULAR CAB, VPUT [TRUCK] T&TT 20-28 8 34.49 $ 2 0.87 0.15 335.93$ 2 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 2 0.86 0.15 73.97$ 3 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 2 0.87 0.15 523.23$ 4 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 2 0.87 0.15 243.31$ 5 S1720 14" CONCRETE SAW, SACR SAWCO ABOP 10-20 4 6.36 $ 0.83 0.18 25.44$ 6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 1,201.88$
15% Markup 180.28$
Total Equipment 1,382.16$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 2528093 BADGER DAYLIGHTING 6/7/2023 1 $ 5,111.29 S $5,111.29 11 59555 KRC SAFETY 6/12/2023 1 $ 1,361.06 S $1,361.06 12 213602575-007 United Rentals 6/1/2023 1 $ 127.69 R $127.69 13 14
15 Subtotal Material, Subs, and Rentals 6,600.04$
15% Material Markup -$
10% Sub/Specialists Markup 647.24$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 7,266.43$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-GF GEN FORMAN MARK R LYONS 54.38 $ 27.98 $ 0.11 10 81.56$ 28.80 $ 0.11 1,224.99$ 100-FMN FOREMAN ROBERTO ZAVLA 50.03 $ 27.85 $ 0.11 10 75.04$ 28.60 $ 0.11 1,150.39$ 100-FMNx FOREMAN ROBERTO ZAVLA - $ - $ 1 100.05$ 29.35 $ 0.11 143.64$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 10 66.35$ 28.34 $ 0.11 1,051.01$ 100-JWx JOURNEYMAN KEVIN L ANDRADE - $ - $ 1 88.46$ 29.00 $ 0.11 130.38$ - $ - $ - $ - $ - $
Subtotal Labor 3,700.41$
35% Mark Up 1,295.14$
Total Labor 4,995.55$
SUBTOTAL 13,644.14$
-$
13,644.14$ T OTAL COST THIS REPORT
DE
SCRIPTION
A-C Electric Company
CUSTOMER
REFERENCE
A-C JOB NUMBER
CUSTOMER JOB #
Start of Shft 5/31/23 Sawcut asphalt, demo asphalt, install conduit and add trench plates. Pothole trench across Locust at location 24+76 Invoice Description
Hydro Excavating
Traffic Control
Mini Excavator W/Trailer
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 June\CR 63.02 June EWBPrinted 2/7/2025 �,c'>x{.rc,
V, .,
� 't
,,(l_e lJ.� e� -CALIFORN1AC"10LICENSE99849
0 O
1) ·'
<}''r .k u c
"-
Daily Work Report
DWR #: 142520
ENG IN EERI NG-CON STRU CTI ON-TECH NO LOGY-SERVICE
Submitted By: ROBERTO ZAVALA on 6/1/2023 8:45:03 PM
Job/Work Order Number
VR 0337
Date
2023-06-01
CCO No./Area
Required for Mand Rjobs
CR63.01
Site/Location
Locust
Division
Visalia
Descript ion of Work
Job Name
DOWNTOWN STREET LIGHTS
Job Home Local
100
P.O.Number
Customer
CITY OF VISALIA
Local ReportingTo
100
QuoteorT&M
0 Quote
Work Complet ed?
0 Yes el No
elT&M
Saw cut asphalt, demo asphalt, install conduit and add trench plates. Pothole trench across locust at location 24+76 Employees
Technician .. _ Dispat_ch Time End Time Class ST OT DT TT Adders ----·-"~·-· -�·------- MARK R LYONS 08:00 PM
ROBERT() ZAVALA 08:00PM
KEVIN LANDRADE 08:00PM
Materi als
Qty
2 2
UOM
Rental
A-COwned
A-C Owned
A·C Owned
A·COwned
A·COwned
Material
3/4"x4'x8' trench plates
3/4"x4'x10' trench plates
10 10
10 10
4 6
10595346
Mv521
51547
Mv653
MV541
07:30AM
07:30AM
06:30AM
Vend or
Vendor
GF 0 10 0 0
F 0 10 1 0
J 0 10 1 0
Vendor/Truck Stock
0 0
0 0
0 0
Mini ex
Cone truck
Light tower
Hwy truck
Quickie saw
Foreman truck
0 0
0 Packing Slip No.
Verd
0 0
0 ----- ------- --- ------ - --- ---·----------·-·--· ··, I
-- ___ .............. _._ --·-----.. --·-·7
i I
·--- -·-··------·········-···--·---······-········ ......... _____ ,, ____ , ______ .......... __ -··--·-·· ----····--·· .. --.•···· -···--··-.. ·· .. --i !
----~· •r- ..... ------ ·- .. ---~ -~ ....... - - - - .. - .. ~ ____ __ • ., ..,,~ ... - - .. ·------······----·- · - - --•-•·------ - · ··- - - - ---· ··- -·· ....... - • .. .... ,,.,_,_. _____ ,. ,,. ••• _.._ _ _ _ _,,. --••·•--·-··-· - ---·-· --- ------- - '
Equipment
A-C Owned/Rental
1.,._ .,y--•---· -----.. -.... ---·---- -----
Hours A-C Eq. #/Rental Agency·---·----.. -·-·····t::,1il~ .. .. ________ Equipment.Description .. -·--···· - ------··"··· ······· -·-··-· .. --....... _ ...... __ ._ .... - ....... __ . ____ . _____ _ ·-··--··-··- .... ··---
Subcontractors
Ticket No.
Approved By
Customer Representative. ..
James Grier
Completed By
Field Representative. ..
Mark Lyons
Badger
KRC
Pothole trench crossing
Traffic control
Customer Signature
Subcontract- Direct Job Item
�LG,· 'I �\r'Su�iZf-
Field Signature
Add Signers
0 Yes
Badger Daylighting Corp
R!IDGER
DAYLIGHTING,.,
A-C ELECTRIC COMPANY
PO BOX 81977
BAKERSFIELD, CA 93380
q1,1j)tc:i.mer Nuinbef_
35951
-·.· .. ··.·.. POJ:1/Vorkbrdei
VR0337 I
Servic:E! tfc:kef# ···>uhit#'.-' .item t>esc:ripfiqh••
.... __ e .. . . ··•j:P;;:::-<!'.'.?>'.';Y::;:;�::-:.);:::·;_f.L> ;/- :.-:-:·--:\:::·i::::::_::c:<:···\.:'i'.'.-:-.. __ -,:._·::·:L 05-31-2023 TKT-053123-904369 2020 Badger Hydrovac
With Operator
Premium Time
05-31-2023 TKT-053123-904369 2020 Consumable
Materials
05-31-2023 TKT-053123-904369 2020 Badger Hydrovac
With Operator
Overtime
05-31-2023 TKT-053123-904369 2020 Fluctuating Fuel
Recovery
05-31-2023 TKT-053123-904369 2020 Supply Water
- 1-2023 TKT-060123-905643 2020 Consumable
Materials
06-01-2023 TKT-060123-905643 2020 Badger Hydrovac
With Operator
Overtime
06-01-2023 TKT-060123-905643 2020 Fluctuating Fuel
Recovery
06-01-2023 TKT-060123-905643 2020 Supply Water
06-04-2023 TKT-060423-906991 819 Badger Hydrovac
With Operator
Premium Time
06-04-2023 TKT-060423-906991 819 Consumable
Materials
06-04-2023 TKT-060423-906991 819 Fluctuating Fuel
Recovery
06-04-2023 TKT-060423-906991 819 Supply Water
06-05-2023 TKT-060423-907009 819 Consumable
Materials
06-05-2023 TKT-060423-907009 819 Badger Hydrovac
With Operator
Overtime
06-05-2023 TKT-060423-907009 819 Fluctuating Fuel
Recovery
06-05-2023 TKT-060423-907009 819 Supply Water
1 1
12 1
1 1
11.5 1
12 11.5
Please see attached tickets for additional detail
.•.REIVliT.TP .....
2528093
06-07-2023
90 Net
'\�\4J,:}t}\\lYilWt_$
\t}f�\9;��!0)iiii
Badger Daylighting Corp
PO Box95000
LB# 1627
Philadelphia, PA 19195-0001
Bank Routing#: 026013673
Account#:03248177952
.. ·······-. sadsei'Sa1esA:rea•·.·•··.
40004
· Uhit.of
'M•Ef:�S'J:t�--
Hour
Each
Hour
Each
Each
Hour
Each
Hour
Each
Each
Each
Hour
Each
Uhif Pii'<e . Amouht
·.i�
405.00
25.00 350.00
401.29
80.00 25.00
350.00
351.88
80.00 405.00
25.00 423.02
80.00 25.00
350.00
351.88
80.00 TotaLDue USD
405.00
25.00 4,200.00
401.29
.00
25.00 4,025.00
351.88
SO.OD
4,860.00
25.00 423.02
80.00 25.00
4,025.00
351.88
80.00 19,463.07
Badger Daylighting Corp PO Box 95000, LB# 1627, Philadelphia, PA 19195-0001 Phone: (877) 322-3437 Please direct all invoicing inquiries to [email protected] and remittances to [email protected] •··.:, -·· , .. ,.•
.. •:
;i,,-'_.i
""• . - .-· ...
•,,•'
, . .,..
. ·•
--,· · ...
. ' _ .. . ...
: :_;,,
.. ,•·:···'
: . '. .1
.. . . . ".,
_: _ _ . . ·:
.. :-~. ·.:
.•• -,J'
,•·'
.--.. ,
' .. _,_.
__, ','·'1·';'"""~
t
• , _i" r'
-··.-,.:
.,·
,• .
A-C ELECTRIC COMPANY
PO BOX 81977
BAKERSFIELD, CA, 93380
Job Name: Downtown Street Light Project- Visalia
Trenching
Site Location: LOCUST ST Visalia, CA, 93277
Requesters Name:
Cost Centre/GL: Major/Minor:
Badger Contact Info: 3054 East Cartwright Avenue
Fresno, CA. 93725
CA License #945499
Ticket Number: TKT-053123-904369
Ticket Date: 05-31-2023
Job Number: SR0000400085
Paper Ticket#:
PO/WO #: VR0337
AFE/JOB #:
Phone: 559 2332208
Rig/Well Pad #:
Job Name: User/Approver ID: Other Order#:
Item
Badger Hydrovac With Operator
Overtime
Badger Hydrovac With. Operator
Premium Time
Consumable Materials
Supply Water
Disposition
Fluctuating Fuel Recovery
Notes:
Approved By:
Approver Name:
Approver Phone #:
Item Description
This is not an invoice
Total subject to change based on taxes, fees and other charges.
Unit# Quantity
2020 12
2020
2020
2020
2020
2020
Rate
$350.00
$405.00
$25.00
$80.00
$0.00
UOM
HR
HR
EA
EA
EA
Ticket Total:
Amount
$4200.00
$405.00
$25.00
$80.00
$0.00
$401.29
$5111.29
Unless Buyer expressly advises otherwise, Buyer represents and warrants that the soil and groundwater in the area of the Hydrovac excavation operations is not contaminated with any non-naturally occurring substance, and buyer hereby indemnifies and holds Badger Daylighting Corp (or LP in Canada's case), and its directors, officers, employees, agents, and contractors harmless from all losses, costs, expenses, and penalties which it or they directly or indirectly suffer or incur in the event the soil and or groundwater is contaminated with any substance other than naturally occurring substances.
BADGER
DAYI.JGHTING~
~~}{t';;--~--·--.
..... ,,. ...
~-.·:;' :J~\\?,. · ... :
··.·; _:·;;
~...=-···t->.
·,:{:::..-.:.
. •.•:.: :·-:·•.
. "' /.' .
• ·,.: ... :_'.,:')i:'.}\~.:i:(:tJ·>
" .• -~>·:~~
;·.:,i,:.'->:·i
:'} ,', ,' ,:·/·:·•·/
.-~~>/:.=,:.:::~~
_ .. __ _ _._,,_
7 hrs
Total $1361.06
(
TRAFFIC CONTROL~ SAFETY SUPPLIES ~ EQUIP11ENT RENTAL ~ TRAFFIC DESIGN Invoice
!!ii.A.FETV CD-,. INC.
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fax# 559-732-2684
Bill To
Date
6/12/2023
Job Info:
ACELECTRJC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALIA
VR0337
P.O. No. Terms Due Date Ordered By:
VR0337 Net30 7/ 12/2023
Date Item Description Quantity Rate
05/29/2023 2 man 001 2 man lane closures - 1-8 hour shift 05/29/2023 Overtime Overtime - Per hour (8-12 hours)
05/30/2023 2 man 001 2 man lane closures - 1-8 hour shift 05/30/2023 Overtime Overtime - Per hour (8-12 hours)
,,,---
05/31/2023 2 man 001 2 man lane closures - 1-8 hour shift 05/31/2023 Overtime Overtime - Per hour (8-12 hours)
r--
06/01/2023 2 man 001 2 man lane closures - 1-8 hour shift 06/01/2023 Overtime Overtime - Per hour (8-12 hours)
JNOEMNITY" AGREEMENT. All Item$ covcr"'cd by thi::;. Coc.:urnc:nt :;h~U be at the ::--ol~ r'i::-;k ot "the Cu::.torncr. Cu~ton\Cr as;;rcc~ to de:fcnd,. indcrnnJfy ttnd hold Mrrntc= KRC SAFETY CO.,. itf; offl c,:r-:;, director.-. and ernploye:.e~ ... from ~nd ~~,n~t :i,,ny ~nd ~I 11::,,blll"l:Y d~Y'l'll:::_..J'-'dS::il"nen.t:s_.. co~ ... ~~t-ney fee:::,.. or dti:.mDnd~ Qof llti~on .-,Pi,sj ns::from the t..1::.c,. m~I ntcn~ncc,. open:,tion,. or po::.sc::--~ on of the: equipment indudlns::,: but not:Hrnlt::ed to,.. tho~-e. arli::lni;:-from the ~ct:iv<:: nc£)'1£cnc<: oT' KRC SAFETY CO . ., iU officcll"'!:,. d~.rccto~ ~nd Cr'nployee~ .. Tr'om il""IJUJ"'Y to Of"" dc::!rt.h of-1:he Cu:-tomer ... Cui,tom~...-~ cm~lcye~=:. .. Qr ~ny other pet"'$0t"'I,, orft"Om d:am~~ to :any property,. save ~nd except there :::h::,.11 be no obll~i:Jot') on the p;!at't of 'the C~~"'tom-=~to defend,. lndcmnH'y .:ond hold Mrmlc:;:~ KRC SAFETY CO.,. it:;. officer.:;., director:.:., :ond cmpl Qy,e es. .. If the ll~bill t'Y .. cl~l m~ ... Jud,s:n'll~nt,:: .. c:o.~~ ~ttor"n,e:y~ fee~ .. or dcn"l~nd~ of' Utl ~ti on ot.hcl""\IV, s.c ;s:fvin,;:.. n-::::.e 't::-0 ~.vch obll~~on an~c ft"'Om the !::ole nei::Jis.:cncc or willful mi~c::ond~ of KRC SAFETY CO,,. i"t:i- offl cer.s,. d1 rector:.:.,. ond ernpl oyces. If Customer refusc:5 t:o d c-fcnd, I ndcmni,fy ::,-nd hold ~rrnl ~:::~ l(RC S.A.FETV CO..., It$ offt ccr..:,. dlt'cctol"":;,. Gnd cmp1 oyec::;:; :ond :.u~cqucntly ~ drtcrrnl n:;:,ti on~::: m:o-dc th.at:
li~bility I::: not: due t:o the s.ol e n,es;:lls::enc:e or willful rnl~onduc;t of KRC SAFETY co., lt-:;: offic.cr- 1 dtrec:tor-::;: 1 :end employee~> Customer- J::: obll~cd t:o reimbur..::e any .!Ind all 11:m.biUty,. c:l~rnt: .. Juds,-nene .. c:os:t.. ~ttor-ney$-f-ec::;., or demond:!- of lit:is:::,tion i:nc:un-<1!:ii,d by KRCSFAl,fTV CO ... It::: offic;cr.::. 1 directors,. :;:,nd Cr"'nf>!oycot'!=- . C',,,l:;:,:or'r"IC:f" ~ZJ""Cc:.: to not.I& KRC SAt=E'TY Co.,. lrnmocdi~t:ely in c:.;::,::;.c of ony ~c:c:idcnt ~nd to obtaiin thi!!.'!: n~me~ ... ~ddres;,::-e~ .. telephone n.1,1 mbe:-r::: ~nd 01:.h.e:r p,crtinc:n"t i nforrn~tl on fro'° ~n ~l"'U ,e::;:
~l"liVOlved ~nd ~II "Vitne:~::.:e:::~
1 2,215.50
1 115.00
I 1,555.50
2 115.00
1 1,555.50
9 115.00
1 1,555.50
8 115.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59555
Amount
2,215.50
115.00
1,555.50
230.00
--
1,555.50
1,035.QQ.,,
1,555.50
920.00
$0.00
$9,182.00
$0.00
$9,182.00
'\
i
1 Day
Total $127.69
OUnited Rentals· :JUN 9
~ 4 WEEK BILLING 0 DN..J INVOICE
,3 A-C ELECTRIC VISALIA BRA.NCH
...t 1035 W MURRAY AVE
Dl VISALIA CA 93291-4721
~ Office: 661-410-0000 Cell: 559-679-7286
7.1.30611 MS 0.5:28 810S5S21 .pOT 28!!171 f•i O
111Mn11 •r11Unl I tJf 1nll di 11111 •I.,'• IIIJ I 111 ,,., 111 tlf lJI.I
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAl<ERSFiiLD CA 93380-1977
# 213802575~007
: 156339
: 06/01/23
: ll/30/22 03 :30 PM
: 06/14/23 00 :00
Cuat0111ar I
:rnvoic• Dat.e
Dat• <Nt
Billed Through
OR Jol:) Lea
'C'R Jol:) t
cwn:cmer Job p.o. I
: 1035 W MURRAY AVE, V
: 430
l:D;
~ VR0337
: JOE MERCADO R•~•t•d By
R•a•rv•d. By Saleapar11on
: CLIFFGENESI9 SALUDEZ
: BRYN WHITE
~I
Invoice Amount: $2!553.88
Teima; OuOJpc,r, R90eipt
Paymenroplklna: ~oa.-~llllice 7'04-916-4877
REMIT TO: UNITEO RENTALS (NORTH AMER!CA).INC.
P.O, BOX 0511~
LOS ANGELES CA90074-1122
RENTAL ITEMS,
_. ~ Bguipment __ ..:De:::::;::s:::;c:ri=PE=i~on---------~ -..:Mini====.....,...._/_..:D:.::~:...-1-J-....!!we:e~k~_....;4::....!~~e~e:!lok'--____ Amo="-un=t--+ i 109'49061 •• 'l'RAILkRTILT l2•-l6•ro 1;99~~ ···- {._--;;a:-,·L•.~;t3----~;-n-- Make: TOW MASTER Model: T-9DT 16' \_ ~ -
4113.73
l 10595346
Serial: 4KNB'.1'2325l<Ll626l3
MINI EXCAVATOR 7400-9199#
Make: TAXBUCHI Model: 713240
Serial, 124002620 Meter out: 1435.80 Meter iQ:
l 907/0525 Ml:NI EXCAVATOR BUCKBT 12"
SALBS/MISCl!:LI.ANEOUS ITBMS:
_ __.o._t.._y Item
1 ~ .PERSONAL PROP TAX REIMB Ca.MGR
COMMlmTS/ROT!iS,
CONT~CT: JOB MBRCADO
CELI.f: 559-556-5783
[DRSORCA/MCIJ
Price
14.070
Billing period: 28 ~ys Prom S/l?/23 03:30 PM Thru 6/14/23 03,30 PM 1,034.00 1,876.00 1,876.00
N/C
Rental subtotal: 2,339.73
Unit. of Measure Extended Amt,
EACH
Sales/Misc Subtotal:
Agr~t SuJ;,total:
Tax:
TOt&l!
l.4.0?
~4.07
2,353.80
200.08
2,5S3.88
Uf•oth• January 1, 202l. ,nd 1rhiff• p•mtt41d by law, ZM:l.ted Rwt&ls Illa)' iapo&a a s1u·ctiarg• ol! 1.8\ t,;,r credit card p■ymwata cc ~e a<:ccwits. "rbi• ■uiechar9e i■ aot greatlll' l:1lazt our much~ dJ.11COI.IDt rate fc,,e cr••Ut c=a-d tra.:1111actlc,n11 aSld i■ •uhj•ct tx> ealeo tax in ■ ane ;lurildict:l.on•.
li'O'l':CCJh Tlli ■ :hivoic:a b ■112:ij ■ct to ti>• tema ■nd con.d:l.tic,~ o:f th• Relltal and se:vica Agr•.,_,_t, 'ldlich are availabi.. at ..... - .. n- .-1-. ..... -1:.a1•.e-11-1/:emtal·l•Z'v~~•-t•m••W &Dd Whi<:11 are 1~orporat4td harel'Cl by refueace. A COPY or~ ~.iu.
CALTRANS ROW
CITY OF VISALIA DATE: 7/11/2023
VR0337 DWR DATE: 6/2/2023 SOS 6/1/2023
AREA DWR NO.: 142538
CONTRACTOR REPORT NO. Rpt 2
CR NO.: 63.02
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 2 0.87 0.15 523.23$ 2 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 2 0.87 0.15 243.31$ 3 MV521 F-250 XL REGULAR CAB, VPUT [TRUCK] T&TT 20-28 8 34.49 $ 2 0.87 0.15 335.93$ 4 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 2 0.86 0.15 73.97$ 5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 1,176.44$
15% Markup 176.47$
Total Equipment 1,352.91$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 59555 KRC SAFETY 6/8/2023 1 $ 1,237.75 S $1,237.75 11 2528093 BADGER 6/12/2023 1 $ 4,481.88 S $4,481.88 12 S5522714.002 ALAMEDA 3/15/2023 11 $ 7.44 M $81.87 13 213602575-007 UNITED RENTALS 6/1/2023 1 $ 127.69 R $127.69 14 308616 VIKING READY MIX 6/2/2023 19 $ 159.08 M $3,022.52 15 Subtotal Material, Subs, and Rentals 8,951.71$
15% Material Markup 465.66$
10% Sub/Specialists Markup 571.96$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 10,008.49$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-GF GEN FORMAN MARK R LYONS 54.38 $ 27.98 $ 0.11 10 81.56$ 28.80 $ 0.11 1,224.99$ 100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 10 75.04$ 28.60 $ 0.11 1,150.39$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 10 66.35$ 28.34 $ 0.11 1,051.01$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 3,426.39$
35% Mark Up 1,199.23$
Total Labor 4,625.62$
SUBTOTAL 15,987.02$
-$
15,987.02$
A-C Electric Company
CUSTOMER
REFERENCE
TOTAL COST THIS REPORT
A-C JOB NUMBER
CUSTOMER JOB #
DESCRIPTION Start of Shift 6/1/23 Remove trench plates, pothole trench, install conduit, pour slurry, and reinstall trench plates at the following locations 14+66, 21+67, 24+76
SAND SLURRY
Invoice Description
TRAFFIC CONTROL
HYDRO EXCAVATING
WHITE MARKING PAINT
MINI EXCAVATOR W/TRAILER
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 June\CR 63.02 June EWBPrinted 2/7/2025 -A-e IJ.� e� -CALIFORNIAC·10LICENSE99849
ENGINEERING-CO NSTRU CTI ON-TECH NO LOGY-SERVICE
Daily Work Report
DWR#: 142538
Submitted By: MARK R LYONS on 6/2/2023 6:22:16 AM
Job/Work Order Number
VR0337
Date
2023-06-02
CCO No./Area
Required for Mand Rjobs
CR63.01
Site/Location
Locuststa. 21+67 and sta.14+66
Division
Visalia
Description of Work
Job Name
DOWNT OWN STREET LIGHTS
Job Home Local
100
P.O.Number
Customer
CITY OF VISALIA
Local ReportingTo
100
QuoteorT&M
0 Quote
Work Completed?
0 Yes � No
�T&M
Remove trench plates, pothole trench, install conduit, pour slurry and re install trench plates at the following locations on locust 14+66, 21+67, 24+76
Employees
Technician
MARK RLYONS
ROBERTO ZAVALA
;------
KEVIN LANDRADE
Materials
Qty UOM -�--
-- ------- ---
Dispatch lime
08:00PM
08:00 PM
08:00 PM
Material
------- -------
End Time
06:30AM
-- ------- ---- --
06:30AM
06:30AM
Class ST
GF 0
F 0
J 0
OT
10 ----------------
OT
0 -- -- -------
TT Adders
0 0
-- ------------ -- - -- -- -----
10 0 0 0
10 0 0 0
Verd
0 0
0 Vendor/Truck Stock Packing Slip No. -----···-·--··-· -- ------- --- - ----- 19 Yards 2sacksand slurry Ve ndor 912634,912637
Equipment
A-C Owned/Rental
A-C Owned
A-C Owned
A-C Owned
A-C Owned
Rental
i Rental
Hours
10 10
10 10
10 10
---- --- ------- ----------- ---------
A,:_c:_E_q,_11/Rental Agency. Miles
Mv541 0
Mv653 0
Mv521
S1547
10595346
10949061
0 0
0 0
Equipment Description---�
Foreman truck
Hwy truck
Co ne truck
light tower
Mini ex
Trailer
----- ····-·-·- - -·····-i
,,,.,, .. ,_.,..,., . .,.,. ... ., __________________ ., __ , ___ ,,_ -·· Subcontractors
Ticket No.
053123-904369, 060-123-905643,
Approved By
Customer Representative ...
James Grier
Completed By
Field Representative. ..
Mark Lyons
KRC
Badger
Customer Signature
Field Signature
Subcontract� Direct Job Item
Traffic control
Pothole road crossing trench
Add Signers
0 Yes
--------------
Please see cost break down on next page
(
TRAFFIC CONTROL~ SAFETY SUPPLIES~ EQUIPIYIENT RENTAL~ TRAFFIC DESIGN Invoice
SAFETY CCI-,. INC .
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fax# 559-732-2684
Bill To
Date
6/12/2023
Job Info:
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALIA
VR0337
P.O. No. Terms Due Date Ordered By:
VR0337 Net30 7/12/2023
Date Item Description Quantity Rate
05/29/2023 2man 001 2 man lane closures - 1-8 hour shift 05/29/2023 Overtime Overtime - Per hour (8-12 hours)
05/30/2023 2man001 2 man lane closures - 1-8 hour shift 05/30/2023 Overtime Overtime - Per hour (8-12 hours)
05/31/2023 2man 001 2 man lane closures - 1-8 hour shift 05/31/2023
/
Overtime Overtime -Per hour (8-12 hours)
06/01/2023 2man001 2 man lane closures - 1-8 hour shift 06/01/2023 Overtime Overtime• Per hour (8-12 hours)
----
lNDEMNJiY AGREEMENT. All l"tcm:, eove.-oed by thl,= oocumen,: ,oh"II be .,.,:the :,olc r1,;k of thic Cr..1:;:2:orncr-. CU::tom·cr-::>i;:~c::::; to d.cft:::J")d.., indcm..nJfy :and hold h:8t"'mle .= KRCSAFeTY co .... i~ offJcc:~ ... dt redat-=- ~nd empt oYec~ .. f'r'Cun :end .,~n::t ~ny and au U~blHty claims,. Juds:;.mcnt:s,. c:o~ ... :at:ton-t~ 1f:.,e::=:, or dern:ztnd:!'i of Jtti~tiOns!!!rlt;in~-frorn th-c: uz.c.,. m~lnt.cne1ru:c, open!lltion,.. or- po~~c!;Slon .of-t:t:.,r;, -=.Qulp:n'll.ttnt lndudis"IS:: but not Uml"t'it:d to..,.tho~c ~rl~l"'tJZ:ft'-.o,mthe: zii~ve: .ncdJ~cnce of KJ:l:C S~ETY co ... I~ officer":%,.,. di.rec::tor::. ~tld c:rnpl,;,yee,:;~ 'fr-om ff"jU:T)I' to orde~ of1:he CU_~tom.er.,. et..t~,:omer':; ,e:rnpl-oyec-::.,. or=:!lny othe.l"' pcrs.on,. 0r-fron1 d:aro:::,s;:c.to ~ny prop.c1"1:¥.,. s~c: and cxceptthcrc ~h:Z!iill b,o- no obllt:a-tfQn on th:e p~rtof the Cu~Or'n.cr-to defend,. indemnify :::,;nd h.cJd h~rrnl~= K;RCSAFETV co., it:::;: offic<.m, dJrcctors, :o-n.d Cr"n.ploye~~ ... lf'?:h~ Jieab.iU,:y.., cl~lm~ .. JYd&n',lent.$., co,t;~;:: :::iit::t.o,.ncy-:: fee:<:::, or- dcm~nd::: of fitl~tJon other-wt:::e ~v~nz rl:i:c to ::.:uch obll~tl on :an::.:-=: 'fr-om tht !!Ole ncdl gcnce o.r-wJ llf'uJ ml~coi,.duct of t<:RC SAF e-rv CO~ .. its offic::c:t's-., dlr-cctor'::;;., ::=ind c~p.loyccs. If: Customer rcfu:;;c~ 'to defend., lndcmni,fy :and hold ~rrnlcss KRC ~ETY co.., It:~ officer:;.,. dircctoN,. .ond c:rns,I cy.ee~ ~nd :;;ub~equently ~ dct<:J""f'nin:ei'tion 1-::. m~dc ~~--= 11 :abl.lit'-/ t;:::: not: dt.-te ,:o the ;::::.oJ e ncitlli:er'lcc or wffl'ful mh:::c:oti.dt.Jct o-f KRC SAFETY co.1 ,t:::: offlc:c:r-., en rc:c:tor::-.., Z!lind crnpJoyce.::,. CU~rncr I!. obll~d to reJmbur-$.e: -=any .c!lnd :sSl ll~blJlty_., dalros:,,.J.t.,z..({gt"fllent!=., e:o~ :cttorney;!; hi:,~~ or dern::i.nd!;; of 111:i ~on-incurred by KRC SFAETV CO~,. Ji:$ off,eer':$,. dircet-Ot""$",. ~nd cm_ptoycc$. C~::;tomer"' :o-~rcc-~ to no1:tfy K~CSA'FE"rY co ... lrnr"ncdt~Ci::::ly in c:::ii:;c of ~ny ~c:c:ident ::,nd to ob"Qai n the n~m~=::,. ~ddr«=4':i:::,. ,;e.1 ephon-e nt,.tmbcr$ ~nd other per"tli"I.-C:1"11= I nfOl"t"t'!~ti on frr:Jm au ~~u""d ~:::
tnvolve:d and :alJ ~t:ne!'.'.se:a.
1 2,215.50
1 115.00
1 1,555.50
2 115.00
1 1,555.50
9 115.00
1 1,555.50
8 115.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59555
Amount
2,215.50
115.00
1,555.50
230.00
1,555.50
1,035.00
.,...--....._
1~~
$0.00
$9,182.00
$0.00
$9,182.00
Contract Hrs CT ROW EW HRS Supervision HRS
10.00 10.00
10.00 10.00
10.00 10.00
30.00 30.00
Hours % worked 50% 50%
KRC Invoice 59555
6/1/2023 2-man lane closer 1-8 hour shift 1,555.50 $ 777.75$ 777.75$ Split per % worked 6/1/2023 Overtime (8-12 hours) 920.00$ 460.00$ 460.00$ Split per % worked 1,237.75$ 1,237.75$
CR63.02 Rpt 2, Amount 1,237.75$
A-C ELECTRIC COMPANY
Job Cost History Report From 06/02/23 To 06/02/23
UnPosted? Including Payroll and A/P Invoices in Progress Tran
TypeDate Reference Description Additional Information Hours Job: VR0337 DOWNTOWN STREET LIGHTS
Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR
06/02/23 PR AVENAA ANDRES A AVENDANO Check# F43132
10.00 10.00
06/02/23 PR AXIOEA ERIC A AXIONOFF Check# F43133 10.00
06/02/23 PR MARTJ6 JOSE M MARTINEZ Check# F43037
Subtotal for Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR 30.00 Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR
06/02/23 PR ANDRKL KEVIN L ANDRADE Check# F43128 10.00 06/02/23 PR LYONMR MARK R LYONS Check# F43158 10.00
10.00 Printed by SMF as of 01/24/25 2:34PM
Subtotal for Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR 30.00 06/02/23 PR ZAVAR0 ROBERTO ZAVALA Check# F43190
Badger Daylighting Corp
i;!IC1..i'o .��•-·----·-
A-c ELECTRIC COMPANY
PO BOX 81977
BAKERSFIELD, CA 93380
·•· •.•. CfrstomerNumber
35951
_ _ PO/Wol"l<Orcler
VR0337
Service tic:icet# • Unit# it.em Oe§cdiltion
·••· o�f�? ,::�-;:',·_:,:-,-;; >'.;;_:;;>:<·\;'·-.:-
//-.,, ';� r-.-)?/\/{:_\: '-:-. __ ---_:\_::-\:r-:-._ i-_.::'-_):.<r-'::?>, :-):--, 05-31-2023 TKT-053123-904369 2020 Badger Hydrovac
With Operator
Premium Time
05-31-2023 TKT-053123-904369 2020 Consumable
Materials
05-31-2023 TKT-053123-904369 2020 Badger Hydrovac
With Operator
Overtime
05-31-2023 TKT-053123-904369 2020 Fluctuating Fuel
Recovery
0 -31-2023 TKT-053123-904369 2020 Supply Water
6-01-2023 TKT-060123-905643 2020 Consumable
Materials
06-01-2023 TKT-060123-905643 2020 Badger Hydrovac
With Operator
Overtime
06-01-2023 TKT-060123-905643 2020 Fluctuating Fuel
Recovery
6-01-2023 TKT-060123-905643 2020 Supply Water
06-04-2023 TKT-060423-906991 819 Badger Hydrovac
With Operator
Premium Time
06-04-2023 TKT-060423-906991 819 Consumable
Materials
06-04-2023 TKT-060423-906991 819 Fluctuating Fuel
Recovery
06-04-2023 TKT-060423-906991 819 Supply Water
06-05-2023 TKT-060423-907009 819 Consumable
Materials
06-05-2023 TKT-060423-907009 819 Badger Hydrovac
With Operator
Overtime
06-05-2023 TKT-060423-907009 819 Fluctuating Fuel
Recovery
06-05-2023 TKT-060423-907009 819 Supply Water
·aw
1 1
12 11.5
1 1
12 11.5
Please see attached tickets for additional detail
REMITTO
2528093
06-07-2023
90 Net
W,li�,!i�'14!l:31toicifit
Badger Daylighting Corp
PO Box 95000
LB# 1627
Philadelphia, PA 19195-0001
Bank Routing#: 026013673
Account#:03248177952
sactgef Sales Area_ _ ...
40004
Unit.of. .. Unifl"rice ··p;fuourit• 'M��-sllfe
.• '"···· '"i •' •,:•• •• ' ----.'<' '
Hour 405.00 405.00
Each 25.00 25.00
Hour 350.00 4,200.00
401.29 401.29
Each 80.00 80.00
Each 25.00 25.00
Hour 350.00 4,025.00
351.88 351.88
Each 80.00 80.00
Hour 405.00 4,860.00
Each 25.00 25.00
423.02 423.02
Each 80.00 80.00
Each 25.00 25.00
Hour 350.00 4,025.00
351.88 351.88
Each 80.00 80.00
Tota]O.Lle OSD 19,463.07
1 Badger Daylighting Corp PO Box 95000, LB# 1627, Philadelphia, PA 19195-0001 Phone: (877) 322-3437 Please direct all invoicing inquiries to [email protected] and remittances to [email protected] ~ ... _: ~• .... , .. ·(·
:> ,:): :,,~: .:/~i
-·,.
' • "• :,, •~ ;•• ,• •I '
-..... :::·;·:·.
,,rl ••• :••,/'. ·,'
. ~ ...
. ~:>: :·.-~ -~::_. __ J • •• :
• .' ;~_:
I,!•
.... ,.
,.
:.:~;_/~: •:.~·\~·: ~ :',
·· .. ,.- =.=.·.·· ...
. ·:. ,,..
·>:\-1 >--:·~--~-.
1·'t):.: ..
- ~ .::-. -
. -.. -··
,·•.:
•' .. •' . .. ·_;··
·-·. - .. : ....... , .
. : ......
' (.•.· .,.
• •••'' ;'I• '
... · .
I: •,,
,,· .,''
·:·•· ·., :· ...
' .· :--
BADGER
DAYLIGHTING-
A-C ELECTRIC COMPANY
PO BOX 81977
BAKERSFIELD, CA, 93380
Job Name: Downtown Street Light Project- Visalia
Trenching
Site Location: LOCUST ST Visalia, CA, 93277
Requesters Name:
Cost Centre/GL: Major/Minor:
Badger Contact Info: 3054 East Cartwright Avenue
Fresno, CA. 93725
CA License #945499
Ticket Number: TKT-060123-905643
Ticket Date: 06-01-2023
Job Number: SR0000400085
Paper Ticket#:
PO/WO #: VR0337
AFE/JOB #:
Phone: 559 2332208
Rig/Well Pad #:
Job Name: User/Approver ID: Other Order#:
Item
Badger Hydrovac With Operator
Overtime
Consumable Materials
Supply Water
Disposition
Fluctuating Fuel Recovery
Notes:
Approved By:
Approver Name:
Approver Phone #:
Item Description
This is not an invoice
Total subject to change based on taxes, fees and other charges.
Unit# Quantity Rate UOM Amount
2020 11.5 $350.00 HR $4025.00
2020 1 $25.00 EA $25.00
2020 $80.00 EA $80.00
2020 $0.00 EA $0.00
2020 $351.88
Ticket Total: $4481.88
Unless Buyer expressly advises otherwise, Buyer represents and warrants that the soil and groundwater in the area of the Hydrovac excavation operations is not contaminated with any non-naturally occurring substance, and buyer hereby indemnifies and holds Badger Daylightlng Corp (or LP in Canada's case), and its directors, officers, employees, agents, and contractors harmless from all losses, costs, expenses, and penalties which it or they directly or indirectly suffer or incur in the event the soil and or groundwater is contaminated with any substance other than naturally occurring substances. i?/?:. 1
;:!:.: .. ;,J.•',
. :f::,
.•·,•:-·: .
,' ••' :'.,• ::·:· ...
:··-:,?\\,.:i'.\-~:;;':./i·.:)>:,:;' .. -.
l'ALAMEDA ELEC'mlCAL OISTRJBUTORS
A-C ELECTRIC
AED/CST Br11
7044AVE 304
PO BOX760
GOSHEN CA 93227-0760
559-651-2096 Fax 510-785-4457
HOUSE ACCOUNT VISALIA
POBOX81977
BAKERSFIELD CA 93380
AERVOE 255WHITE CONSTRUCTION
MARKING PAINT WATER-BASED 20oz
(12/CTN)
ALAMEDA ELECTRICAL DISTRIBUTORS,INC
3875 Bay Center Place
HAYWARD CA 94545
SHIP TO:
A-C ELECTRIC CO - HOUSE VISALIA
1035 WEST MURRAY AVENUE
VISALIA CA 93291
-----
ENROLL TODAY!
Go To https:/lalamedaelectric.biHtrust.com Use the enrollment token at the bottom of this invoice.
Have access to your invoices 24T!
Thank You For Your Busm.;ss!
Web Enrollment Token: KGH PLT ZWQ http://alamedaelectric.bHltrustcom Mar15,20Z31�41PM M011638S
utflAtShop SSS:22714.002
SUBTOTA 82.32
FREIGHT
SALES TAX 0.00 �-----1
AMOUNT
DUE 82.32
All claims for shortage or errors must be made at once, returns require written authorization and are subject to handling charges. Special orders are non-returnable. This order is subject to the terms and conditions of our credit application. Overdue accounts will be charged a finance charge.
INVOICE
------·~-.
I -., • .. - .,., . ,,_
al
1 Day
Total $127.69
OUnited Rentals· :JUN 9
~ 4 WEEK BILLING 0 DN..J INVOICE
,3 A-C ELECTRIC VISALIA BRA.NCH
...t 1035 W MURRAY AVE
Dl VISALIA CA 93291-4721
~ Office: 661-410-0000 Cell: 559-679-7286
7.1.30611 MS 0.5:28 810S5S21 .pOT 28!!171 f•i O
111Mn11 •r11Unl I tJf 1nll di 11111 •I.,'• IIIJ I 111 ,,., 111 tlf lJI.I
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAl<ERSFiiLD CA 93380-1977
# 213802575~007
: 156339
: 06/01/23
: ll/30/22 03 :30 PM
: 06/14/23 00 :00
Cuat0111ar I
:rnvoic• Dat.e
Dat• <Nt
Billed Through
OR Jol:) Lea
'C'R Jol:) t
cwn:cmer Job p.o. I
: 1035 W MURRAY AVE, V
: 430
l:D;
~ VR0337
: JOE MERCADO R•~•t•d By
R•a•rv•d. By Saleapar11on
: CLIFFGENESI9 SALUDEZ
: BRYN WHITE
~I
Invoice Amount: $2!553.88
Teima; OuOJpc,r, R90eipt
Paymenroplklna: ~oa.-~llllice 7'04-916-4877
REMIT TO: UNITEO RENTALS (NORTH AMER!CA).INC.
P.O, BOX 0511~
LOS ANGELES CA90074-1122
RENTAL ITEMS,
_. ~ Bguipment __ ..:De:::::;::s:::;c:ri=PE=i~on---------~ -..:Mini====.....,...._/_..:D:.::~:...-1-J-....!!we:e~k~_....;4::....!~~e~e:!lok'--____ Amo="-un=t--+ i 109'49061 •• 'l'RAILkRTILT l2•-l6•ro 1;99~~ ···- {._--;;a:-,·L•.~;t3----~;-n-- Make: TOW MASTER Model: T-9DT 16' \_ ~ -
4113.73
l 10595346
Serial: 4KNB'.1'2325l<Ll626l3
MINI EXCAVATOR 7400-9199#
Make: TAXBUCHI Model: 713240
Serial, 124002620 Meter out: 1435.80 Meter iQ:
l 907/0525 Ml:NI EXCAVATOR BUCKBT 12"
SALBS/MISCl!:LI.ANEOUS ITBMS:
_ __.o._t.._y Item
1 ~ .PERSONAL PROP TAX REIMB Ca.MGR
COMMlmTS/ROT!iS,
CONT~CT: JOB MBRCADO
CELI.f: 559-556-5783
[DRSORCA/MCIJ
Price
14.070
Billing period: 28 ~ys Prom S/l?/23 03:30 PM Thru 6/14/23 03,30 PM 1,034.00 1,876.00 1,876.00
N/C
Rental subtotal: 2,339.73
Unit. of Measure Extended Amt,
EACH
Sales/Misc Subtotal:
Agr~t SuJ;,total:
Tax:
TOt&l!
l.4.0?
~4.07
2,353.80
200.08
2,5S3.88
Uf•oth• January 1, 202l. ,nd 1rhiff• p•mtt41d by law, ZM:l.ted Rwt&ls Illa)' iapo&a a s1u·ctiarg• ol! 1.8\ t,;,r credit card p■ymwata cc ~e a<:ccwits. "rbi• ■uiechar9e i■ aot greatlll' l:1lazt our much~ dJ.11COI.IDt rate fc,,e cr••Ut c=a-d tra.:1111actlc,n11 aSld i■ •uhj•ct tx> ealeo tax in ■ ane ;lurildict:l.on•.
li'O'l':CCJh Tlli ■ :hivoic:a b ■112:ij ■ct to ti>• tema ■nd con.d:l.tic,~ o:f th• Relltal and se:vica Agr•.,_,_t, 'ldlich are availabi.. at ..... - .. n- .-1-. ..... -1:.a1•.e-11-1/:emtal·l•Z'v~~•-t•m••W &Dd Whi<:11 are 1~orporat4td harel'Cl by refueace. A COPY or~ ~.iu.
Subtotal $2832.00
Tax $190.52
Total $3022.52
Taxable
::::::::::::::::::~ :::::::: INVOICE 3UN08 21
VIKING READY MIX SALES
1830 S. MILLIKEN AVE., BUILDING G • ONTARIO, CA 91762
(909) 657-4000
00001234 06/02/2023 308616 1
SEND PAYMENTS TO:
AC ELECTRIC COMPANY
. P.O. BOX 81977
BAKERSFIELD, CA 93380
VIKING READY MIX CO., INC.
C/O VIKING READY MIX SALES
15821 VENTURA BLVD., #475
ENCINO, CA 91436-4778
6932 CENTER & LOCUST VISALIA - _,, ____ _ , , ... --· ----- - • PO· NUMBER:-·VR0337
06 / 02 116-210122 9.50 CY 2.00SK SAND SLURRY 118 . 000 0 .00 1121. 01 06/02 116-210122 1.00 LD PUBLIC WORKS DELIVERY C 200.000 0.00 200. Ot 06/02 116-210122 1.00 LD ENVIRONMENTAL FEE 40.000 0.00 40. Ot 06 /0 2 116-210122 1.00 LD FUEL SURCHARGE 40.000 0.00 40. 01 06/02 116-210122 1.00 LD LOW CARBON FUEL - SURCH 15.000 0.00 l S I QI 06/02 116-210125 9.50 CY 2.00SK SAND SLURRY 118.000 0.00 11121.01 1 06/02 116-210125 1.00 LD PUBLIC WORKS DELIVERY C 200.000 0.00 200. 0( 06/02 116-210125 1.00 LD ENVIRONMENTAL FEE 40.000 0.00 40. 0( 06/02 116-210125 1.00 LD FUEL SURCHARGE 40.000 0.00 40 . 0( 06/02 116-210125 1.00 LD LOW CARBON FUEL - SURCH 15.000 0.00 15. 0( JOB TOTAL LINE 2832. 0(
I
PRODUCT RECAP
19.00 NS20
2.00 555
I 2. 0OSK SAND SLURRY
PUBLIC WORKS DELIVERY CHARGE
2 . 00 530 ENVIRONMENTAL FEE
2.00 520 FUEL SURCHARGE
2.00 525 LOW CARBON FUEL - SURCHARGE
rERMS: Net Due on Receipt. Delinquent if not paid in full within 30 days of invoice date.
Jelinquent accounts are subject so suspension and closure without further notice. In the ivent legal action is taken to collect this account, reasonable attorney's fees and costs will ,e paid by the Customer.
TAXABLE AMOUNT
EXEMPT AMOUNT
SALES TAX
0.00 2832~00
0.00 2832.00
CALTRANS ROW
CITY OF VISALIA DATE: 7/11/2023
VR0337 DWR DATE: 6/5/2023 SOS 6/4/23
AREA DWR NO.: 142564
CONTRACTOR REPORT NO. Rpt 3
CR NO.: 63.02
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV707 DUMP TRUCK 3 YRD TRUON TRUN 2AXL 8 45.02 $ 2 0.81 0.21 433.09$ 2 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 2 0.87 0.15 523.23$ 3 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 2 0.86 0.15 73.97$ 4 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 2 0.87 0.15 243.31$ 5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 1,273.60$
15% Markup 191.04$
Total Equipment 1,464.64$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 2528093 BADGER 6/7/2023 1 $ 5,388.02 S $5,388.02 11 59609 KRC SAFETY 6/16/2023 1 $ 2,905.50 S $2,905.50 12 213602575-007 UNITED RENTALS 6/1/2023 1 $ 127.69 R $127.69 13 14
15 Subtotal Material, Subs, and Rentals 8,421.21$
15% Material Markup -$
10% Sub/Specialists Markup 829.35$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 9,269.72$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-GF GEN FORMAN MARK LYONS 54.38 $ 27.98 $ 0.11 10 81.56$ 28.80 $ 0.11 1,224.99$ 100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 10 75.04$ 28.60 $ 0.11 1,150.39$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 10 66.35$ 28.34 $ 0.11 1,051.01$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 3,426.39$
35% Mark Up 1,199.23$
Total Labor 4,625.62$
SUBTOTAL 15,359.98$
-$
15,359.98$ T OTAL COST THIS REPORT
A-
C JOB NUMBER
CUSTOMER JOB #
DESCRIPTION
A-C Electric Company
CUSTOMER
REFERENCE
Start of Shift 6/4/23 Remove trench plates, pothole trenches install conduit and reinstall trench plates at the following locations on Locust 14+66 and 12+65 Invoice Description
HYDRO EXCAVATING
TRAFFIC CONTROL
MINI EXCAVATOR W/TRAILER
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 June\CR 63.02 June EWBPrinted 2/7/2025 A-e EJ..Lecbz,;,c, e� -CAL!FORN!AC·10LICENSE99849
ENGINEERING-CON STR U CTI ON-TECH NO LOGY-SERVICE
Daily Work Report
DWR #: 142564
Submitted By: MARK R LYONS on 6/5/2023 6:01:33AM
Job/Work Order Numbe r
VR0337
Date
2023-06-05
CCO No./Area
Required for M and R jobs
CR63.01
Site/Lo cation
Locust
Division
Visalia
Description of Work
Job Name
DOWNTOWN STREIT LIGHTS
Job Home Local
100
P.O.Number
Customer
CITY OF VISALIA
Local ReportingTo
100
QuoteorT&M
0 Quote
Work Completed?
0 Yes e, No
e, T&M
Remove trench plates, po thole trenches, install conduit and reinstall trench plates at the following locations on locust 14+66 and 12+65 Employees
Technician
MARK RLYONS
KEVIN LANDRADE
ROBER TO ZAVALA
Ma terials
Qt',' UOM
0 Equipment
A-C Owned/Rental
A-C Owned
A-COwned
A-COwned
A-C Owned
Rental
Rental
Dispatch Time
06:00AM
06:00AM
06:00AM
Ma terial
None
--=En_:__:d Ti:..:m:..:e ___ Class ST OT DT TT Adders Verd 02:30 PM
02:30 PM
02:30PM
GF O 10 0
0 0 0
J 01 0 000 0
F 01 0 000 O
Vendor/Truck Stock
Hours A-C Eq. #/Rental Agency Miles Equipment Description -· ···-·-- -·- --��� -- -------- · 10 10
10 10
10 10
Mv707
---- -------·----
Mv653
S1547
- -- ---- ----
Mv541
10949061
10595346
0 0
0 0
0 0
Dump truck
Hwy truck
Light tow er
Foreman truck
Trailer
Mini ex
1-------···"•""" ___ ______ __ _
I ,--------- -----·------- ---!
Packing Slip No. _
- • •••• , - ~~-~ - __,..,,. ,...-- I
------·I
!
: ___________________________ ---------------------------•--•'---------------- ----- ----------- - r
I
i
Subcontractors
Ticket No.
906991
KRC
Badgers
------
Approvec By
Customer Representative. ..
James Grier
Completed By
Field Representative. ..
Mark Lyons
Company Subcontract� Direct Job Item
Traffic control
Pot hole trench
Add Signers
0 Yes
Field Signature
BrADGER
DAYLIGHTING-
A-C ELECTRIC COMPANY
PO BOX 81977
BAKERSFIELD, CA, 93380
Job Name: Downtown Street Light Project- Visalia
Trenching
Site Location: LOCUST ST Visalia, CA, 93277
Requesters Name:
Cost Centre/GL: Major/Minor:
Badger Contact Info: 3054 East Cartwright Avenue
Fresno, CA. 93725
CA License #945499
Ticket Number: TKT-060423-906991
Ticket Date: 06-04-2023
Job Number: SR0000400085
Paper Ticket#:
PO/WO#: VR0337
AFE/JOB#:
Phone: 559 2332208
Rig/Well Pad #:
Job Name: User/Approver ID: Other Order#:
Item
Badger Hydrovac With Operator
Premium Time
Consumable Materials
Supply Water
Disposition
Fluctuating Fuel Recovery
Notes:
Approved By:
Approver Name:
Approver Phone#:
Item Description
This is not an invoice
Tota! subject to change based on taxes, fees and other charges.
Unit#
819
819
819
819
819
Quantity
12 1
1 Rate
$405.00
$25.00
$80.00
$0.00
UOM
HR
EA
EA
EA
Ticket Total:
Amount
$4860.00
$25.00
$80.00
$0.00
$423.02
$5388.02
Unless Buyer expressly advises otherwise, Buyer represents and warrants tl7at tl7e soil and groundwater in tl7e area of the Hydrovac excavation operations is not contaminated with any non-naturally occurring substance, and buyer hereby indemnifies and holds Badger Daylighting Corp (or LP in Canada's case), and its directors, officers, employees, agents, and contractors harmless from all losses, costs, expenses, and penalties which ii or they directly or indirectly suffer or incur in the event the soil and or groundwater is contaminated with any substance other lllan naturally occurring substances. _: ~ .~: :-·::.-.
.;,~_-;.-_,~-,
•• ", ... ~. ~ :,
.-•·:J·.:
·;!}\.~·:::·, .
. ··_-:-~::;•:~: i~>·
: ' I • ,:~
...
·-.-~\tt~~.
!"", ••···
·; .... __ ,:,
·,,.·,.;:.,·_:;-.-·.:..
····::/'
<: 1)
:'
ii
�
. : /'/
_J\'·b
'
�. \, t\
TRAFFIC CONTROL~ SAFETY SUPPLIES~ EQUIPlvfENT RENTAL~ TRAFFIC DESIGN Invoice
!liAFET'V CCI-,,. INC .
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fa.-..--# 559-732-2684
Bill To
Date
6/16/2023
Job Info:
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALIA
VR0337
P.O. No. Terms Due Date Ordered By:
VR0337 Net30 7/16/2023
Date Item Description Quantity - Rate
06/04/2023 2man 001 2 man lane closures - 1-8 hour Sunday shift 06/04/2023 Overtime Overtime - Per hour (8-12 hours)
06/05/2023 2 man OOl 2 man Jane closures - 1-8 hour shift 06/05/2023 Overtime Overtime - Per hour (8-12 hours)
06/05/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 06/06/2023 2 man 001 2 man lane closures - 1-8 hour shift 06/06/2023 Overtime Overtime - Per hour (8- l 2 hours)
06/06/2023 Arrowboard - A ... Additional arrowboard(s) per shift (includes lane) 06/07/2023 2 man00I 2 man lane closures - J-8 hour shift 06/07/2023 Overtime Qyertime - Per hour (8-12 hours)
06/07/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 06/08/2023 2 man 001 2 man lane closures - 1-8 hour sh ift 06/08/2023 Overtime Overtime - Per hour (8-12 hours)
INDEMNITY AGREE tJIENT. AU Jtern:::: <.o verc;d by thl� Oocurnen� �h�I be 01: 1;hc �oJe r1�Jc of -the Cu::.t:o rne- r c ... �tomcr 01:ri:-:-::. to dc:Tc:nd .. tndc.-nnffy �nd hoJd �r-r-t\Jc�� J<.RC'SAFJ;TY ,CO ... Ha: <>ff•.ca:r:. ., dir�ct;or.; and .ernp lc,ye,c-� .. ft"ono- and �S'3tn�t �ny �nd :a.II ll�blUfy cJ&1m� .. Jvds:m-e-r'lt$,. <:o:::-ts:,. �ttorn,ey fee�. or demand� of l:t1J s-o'ti on .ori� n� from. the:, u::.c .,
rnt1• nt:cr·-u:,.n,:-=: .. ,o,,:,,c:ra:,tj on,. o r po=c:s::;J on o f the cQ1,.1 lpr n,c,nt 1ncludln: but not Um11:c-d 1;0 .. t.ho�<' arl�n:c:frorn t.hc :,ct lv,: r"'l�S:l�ccncc o f
KRCSAF.
e
TY CO, .. 11:� offlc�r::: ..
d,roect:or:;. �f'\d o-mc::, loycc� .. from 1nJVf"Y' t:o o r-
<le-&'\h of t:hc <:us-tort"tcr"
,.
C...�tON'lc,..-� c:mploy--=-e::.
,.
or .eny othe r
pcl'�On ... ◊t" fl"Ol"n d.:::,m;,::c 't.O 1:tny prop-cf"'t;y ,.
�v� and excii:pt'th�r-c ;:h-oU b-c no obU:;:abon Or"J 'the par,: o'f 1:hc C\J�to nu:r ,:o d rd-end .. a ndie-mn,,,_,. �nd hoJ d hormte�i:: KRC s...ASETY CO ... it� offl c,c:f""!;,,. dln:-ctor�. r,nd c""'ployc.c:. .. It the lh:ab.lllty
,.
eJ.t:urn:=- ,.jud::,r'l'lc.n.� .. c:o�t.� ott:om,cy� fee::.,. o r demand:;. or Ut l�tion othC'-....i�c ,:,vtnfi: .-,,r;;,: 't'O �uc:h obl�c,o.c..o"" �.r1.:=-c 'f'Z-ON'I r:he �o1e ne::l•�cn4 =e o r wtll'ful rnt:::::conduct o r
KRC'SA,. E TV co ...
It:.. officer:;:
,.
Ol n:-ctor.)>,. o.nd ,:mp1oy.;cs. . I
f
Cu�t:omcr- ..--=fu�cs: 'to de-fend, •ndcn,n
l
fy .t,nd hot d h� rnilc::-:- KRC
s,t:,,,F,E"rV CO� 1t.::= c;,ff1ccr;
,.
dlrec:tor� .. .:,nd �rnp l oy-ecz. �nd ::.ub-::--=-Quc:"t ly o <dct:e r "n'tlrT�'t:ion k; "'�de th�,:t:
lJ.z,b'Ucy •� not due to t:he �olc '"c;s:l,s:.c1'llCC:: o, ,- w�JJfuf mi-::conduct of KRC S:A.f'ETY co ... •1:::' officC"r ,. dlrc:CT:Or� .. :end e,rnpt,oyce:;
,.
C\J�'t'<>l'nCt"' 1$ o.bhi:;:»'tied 'to r"etmb,..r.::::e :.:tny .:!lind :,,l111.:.bl l lty. cl ()l� .. Jud�l"'ncn� .. <:O� �tto.-ncys fee::. o r dcrn�nd::.. of l1t1.:=:.1::rtionJncurre:d by K:RCS�AETV C0 4., it_:=; offlcf!r,::., d11"cC'tON,. and employe�� Cu�conu::: ,- .t:IZl"c-c-� 'tO rtot:uy �J;t:C 'S.,JJ,,.,Pe T
V CO, . lrnrncdl::at:i:- ly In c�,e of .::iony ::2,:ctdcnt ::,ind to ot>t.:c:,�n the n.t.r'h,e:$ , -bdd,..c�c-::::. t"ll:'tcphonc r"H ,J rnbe-r-:::: ;eil'ld other pcrtl nc-:nt i �fOl"'"rtl.e!t l on. -from :,,II p:a� c-:; tnvoJ"Vcd �nd aU .......wtnc:..�.c-:, .
(
1 2-215.50
6 115.00
'
] 1,555.50
7 115.00
I 75.00
1 1.555.50
8 I 15.00
I 75.00
l 1,555.50
9 115.00
I 75.00
I 1,555.50
6 115.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59609
AmounV--
2,215.50
690.00
,./
1,555.50
805.00
75.00 I.555.50
920.00
75.00 1,555.50
1,035.00
75.00 1,555.50
690.00
$0.00
$12,802.50
$0.00
$12,802.50
\
�
r
- - .... . · - ' --
1 , .. - . .... . - --
I-••-, ,- __ _ .
' '
-r·i- - · - ,,..~ - - i-(
if - ---r -
i' '"f'"('" '" _r •
,-. ··r ·-. -. I • •-• - - •
I • • "' • , 1
•• - , - •---,--- 1- ,- • . ... , • .- - - ,,..- I - 1 •• ... 1, • -•· -r - - ' I -• I I - • I
. ,
, - - t
~ - , •-,r- - •- ' • ••'f • ~ - • •r- - :- · •- ~ ,. { •--~• (" ' - ~ I • • - ··.- - ' .... . f :- - r •• -· r - 1 •• r -• I , .. • r ... t • - -- : ·' . ·-· - 1 --: • f - · • - I - J ; - I , · - ,-...... ---- : - - ,-- •- -,· - -r -----· · 1r· r • ,. . ... ...... .. • - r·- ·· 1 -r· l • . ,.. ... , • • ,· ·• ( · - · I _ __ _ _ _ ,. .. :r -· ·r ·-· -r- ·. ~- •--r- ,r• • - -r-f' I -- ~ - I· I I ; • • - I -, ••• r ,·· ·t-.-- - '\· r-, •r " r •·· ,, -·. -,·· :--- t - ' ~ --• · - 1 - : i • ,- r • ... r - • -- ,-- •-•r-•l'" ,-.·- . i '. 1 ° • I ~ , I r • 1 1 / • ., , , • - "' •; - - ·( • · . r-, 1 -··-- r - ,·,- - - -- ,· . • r r • · , , - · ·, - - 0 1· · - , · .-- , - • , , - · ·1 ··r - , •· 'l 1:
• . . ... r
-. -, .
' . c··
·,
r• ,. 1· · • "" - r , - - r - - - ,- · r--· - , r-·· - ·· . - 1 •, l
- I I
""I ' •, • •,• < ,,. I - I
, ......... _. , .. •◄ . ... - . , · •·- .--· - 1- ·-,·"' I •---~- , •J 1· · · •- I ,- -- -~ r- •• r ·- ,-· - - - --..-~ ---- ~ --r · .,,--'!•-' I - ,· • -- \ r f ' "•• ·- T" ... - "' , ... • ••• -- -- 1 •1- - ~ -1 - r ··• • 1r • •1 • ...,.,._, • r •• • I • • •• '" .,. - " '
: · I • I , . '
- 1· - ' .. . - .... ' ' ·f '
I ' I • - •, • 1 1 1· - 4 1 ·· · : -
- • - · -- 11· - -- ,
I - r
, I
1 Day
Total $127.69
OUnited Rentals· 4 WEEK BILLING
JUNO 9 2023 INVOICE
_3 A-C ELECTRIC VISALIA BRANCH
...i 1035 W MURRAY AVE
rn VISALIA CA 93291-4721
~ Office; 661-410-0000 Cell: 559-679-7286
7,1.30511 Mil 0.!28 81085521-JlQT 288171 1-2 0
1•1filu1
1 'J
1 1Ui rl• ttJ
1 nhrll 11
11 1 •I •l•11Ht 1
1muJ11f ,11111, I
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
# 213802575-007
Cuatomer i : l56.l39
Invoice Dat• : 06/01/23
Date out z l.l/30/22 03 :30 PM
8illlld Through: 06/14/23 00:00
OR .Job Loe : 1035 Pi MURRAY AVE, V
UR Job ft : 430
Cuatomer Job J:D;
P .o. I ~ Vll0337
R•~et•d By : JOE MERCADO
RH•:rved By z CLIFFGBNaSIS SALUDBZ
S&le•par111on : BRni' WHITE
• --,
Invoice Amount: $2,553.88 ~
Tafm1. OU. Upon Raoeipt
p~~ CclnfldOll'crvdloffice 70,l,QJ6-C877
REMIT TO: UNITEO RENTALS (NORTH AMERICA),INC.
P.O. BOX051'22
LOS ANGELES CA 90074·1122
RENTAL ITBMS:
~ Bguipment Descri~ion _..:Mini==mu=111=---.....:D::::a:.:I~--!!We~e~k~_...;4:!...!ff~e!.!:ek~ _____ Amo="'-un=tc......i ... ~- l 10949061-- i'RAILD- TIL'l" 12•~i6• ro 9';99"9R~ • • - Make: TOW MASTER Model: T- 9DT 16 •
Serial: 4KNBT232SKL162613
1 10595346 M~I BXCAVA'I'OR 7400-9199#
Make: TAKEUCHI Model: TB240
Serial, 124002620 Meter out: 1435.80 Meter in: ,00
1 907/0525 MINI EXCAVATOR BUCKET 12''
312.00 1,034.00 1,876.00 1,876.00
Rental Subtotal: SALES/MISCELLANEOUS ITgMS;
_ __,,Qt,.;;...,Y Item Price Unit of Meaeure
N/C
2,339.73
Extended Amt.
l CA PERSON.\I, PROP TAX REIMB CBARGB
COMMKNTS/NOTES:
CONTACT: JOB MBRCADO
CELL#: 559-556-5783
[DRSURCA/MCI J
Billing period: 28 Days Prom 5/17/23 03:30 PM Thru 6/14/23 03:30 ~M
14.070 EACH
Sales/Misc Subtotal:
AgreellteDt Subtotal:
Tax,
T<>tal:
1,4.07
}4.07
2,353.80
200.oa
2,553.SS
Btf11<:Uv• JUIU&J:Y 1, 2021 eis,s whw• p•ntittd by law, 111).ited aeiiWs may iDpo&a a •~rctuu:g• of 1.8\ tor cradit card pa~te = ~e aceoUllt:s. '?bi ■ ~c~ J.• not greater ttum ou:r :ma;rch-=t ,UIIC01ml: rata for credit cud l:rlanaactJ.oza ~ is auh;jact to a&le• t- 1n 101D& juritdicU~.
IIOTlCB, Thi• i,ivoica is allbjact tc th.a teaDS ud c011d:l.tioa., of t!ui ll«lta1 !U:ld service -'91'•-t, which a:ce available at ... .._. 11- .... ~ t-.-.t..-ul• _.,oa/laaal/r-1-ae:rvic::•-t•z:11111~os -4 q;l.,;:li ar-e 111eei:pcr•t•d h■:ra:h• by referenca. A COPY or 'lBII lUllffAl,
CALTRANS ROW
CITY OF VISALIA DATE: 7/26/2023
VR0337 DWR DATE: 6/6/2023 SOS 6/5/23
AREA DWR NO.: 142608
CONTRACTOR REPORT NO. Rpt 4
CR NO.: 63.02
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV707 DUMP TRUCK 3 YRD TRUON TRUN 2AXL 8 45.02 $ 2 0.81 0.21 433.09$ 2 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 2 0.87 0.15 523.23$ 3 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 2 0.86 0.15 73.97$ 4 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 0.87 0.15 199.84$ 5 - $ -$
6 - $ -$
7 - $ -$
8 - $ -$
Sub Total Equipment 1,230.13$
15% Markup 184.52$
Total Equipment 1,414.65$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 59609 KRC SAFETY 6/16/2023 1 $ 2,026.16 S $2,026.16 11 2528093 BADGER 6/7/2023 1 $ 4,481.88 S $4,481.88 12 308442 VIKING READY MIX SALES 6/7/2023 28.5 $ 174.87 M $4,983.80 13 213602575-007 UNITED RENTALS 6/1/2023 1 $ 127.69 R $127.69 14 S5548681.0001 ALAMEDA 4/4/2023 1 $ 16.89 M $16.89 15 S5354161.003 ALAMEDA 7/19/2022 190 $ 4.64 M $881.60 16 S5354161.007 ALAMEDA 8/16/2022 6 $ 10.85 M $65.10 17 S5354161.007 ALAMEDA 8/16/2022 2 $ 22.97 M $45.94 18 S5354161.007 ALAMEDA 8/16/2022 1 $ 12.38 M Sub/Specialists Markup Subtotal Material, Subs, and Rentals 12,629.06$
15% Material Markup 899.00$
10% Specialists Markup 650.80$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 14,198.01$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-GF GEN FORMAN MARK R LYONS 54.38 $ 27.98 $ 0.11 8 81.56$ 28.80 $ 0.11 979.99$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 10 66.35$ 28.34 $ 0.11 1,051.01$ 100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 10 75.04$ 28.60 $ 0.11 1,150.39$ - $ - $ - $ - $ -$
- $ - $ - $ - $ -$
- $ - $ - $ - $ -$
Subtotal Labor 3,181.39$
35% Mark Up 1,113.49$
4,294.87$
SUBTOTAL 19,907.54$
Subcontractor Markup -$
19,907.54$
D
ESCRIPTION Start of Shift 6/5/23 Remove trenches plates, Finish potholing trench on locust 12+65, Install conduit , slurry and reinstall trench plates, Remove trench plates and pot hole at court 10+90, Install conduit , slurry and reinstall conduit.
PVC GLUE
3'' 90 DEGREE SWEEP
3'' PVC 45 DEGREE SWEEP
A-C Electric Company
CUSTOMER
REFERENCE
A-C JOB NUMBER
CUSTOMER JOB #
TOTAL COST THIS REPORT
Invoice Description
TRAFFIC CONTROL
HYDRO EXCAVATING
2 SACK SLURRY
MINI EXCAVATOR W/TRAILER
3'' X 36 PVC 45 DEGREE SWEEP
3'' PVC CONDUIT
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 June\CR 63.02 June EWBPrinted 2/7/2025 ,,
c
'"D'''
' -,
'
0 ,ll-e [;� e� -CALIFORN!AC-10LICENSE99849
.S•'(' I< \Jc"-;,. ENGINEERING-CON ST RU CTI ON-TECHNOLOGY-SERVICE Daily Work Report
DWR#: 142608
Submitted By: ROBERTO ZAVALA on 6/6/2023 9:41:04 PM
Job/Work Order Number
VR 0337
Date
2023-06-06
CCO NoJArea
Required for M and R jobs
CR 63.01
Site/Location
Court and locust
Division
Visalia
Description of Work
Job Name
DOWNTOWN STREET LIGHTS
Job Home Local
100
P.O.Number
Customer
CITY OF VISALIA
Local Reporting To
100
QuoteorT&M
0 Quote
Work Completed?
0 Yes
e, T&M
Remove trench plates , finish potholing trench on locust 12+65, install conduit, slurry back and re install trench plates. Remove trench plates, pothole trench at court 10+90, install conduit, slurry back and re install trench plates.
Employees
Technician --··---Dispatch Time End Time Class
MARKR LYONS 06:00AM
- ---- --- ---- -- -- ----- ---
KEVIN LA NDRADE 06:00AM
ROBERTO ZAVALA 06:00AM
Materials
_ _:Q"ty,_ __ U:::_O:::_-:_:_M ·--·-----------M_a_t_er_ia_l __ _ 285
1 Yards 2sack slurry
Ft 3" pvc sch40
3" 45 pvc sch40
3"x36" 45 pvc sch40 --
Qtpvcglue /
02:30PM GF ------------------ --------------
02:30PM J
02:30 PM F
Vendor/Truck Stock
Vendor
Vendor
Vendor
Vendor
Vendor
Vendor
ST OT DT TT Adders Verd
0 8 0 0 0 0
0 10 0 0 0 0 - •• ,.., ------ -------------. --- ···---------·-- 0 10 0 0 0 0
Packing Slip No.
912732,912733,912734
________ ________ ,,
1 3" 90 pvc sch40
·- ------ - ----·-------;
!_ ___________________________________________ _
t
Equipment ==="-'-----··· ······-·
A-C Owned/Rental Hours
A-COwned 10
A-COwned
A-C Owned
A-COwned
Rental
Rental
Subcontractors
10 10
8 10
10 MV707
MV653
S1547
MV541
A-C Eq. #/Rental Agency
10949061
10595346
-----------
-�----�--·--------� ···-- -------------
TicketNo. Company
Miles -�-gU.i_pme!1t Descrir:>!!_�n
0 Dump truck
0 0
0 0
0 Hwy truck
Light tower
Foreman truck ..,
Trailer
Mini ex
Subcontract- Direct Job Item - ... ,. . .,. ------ ••• •••••••••••• •• ••••••• 907009
Approved By
Customer Representative. ..
James Grier
Completed By
Field Representative. ..
Mark Lyons
KRC
Badger
Traffic control
Pothole trench
Customer Signature
du �c,.qfr;
Add Signers
Yes
Field Signature
---- ,_ .. ____ ...... ., -
1---------··· .. ~--•···----------i
i
------ ------~i
-···--·-··· !
/ ! ------~----·i
0 Please see cost break down on next page
TRAFFIC CONTROL~ SAFETY SUPPLIES~ EQUIP1v1ENT RENTAL~ TRAFFIC DESIGN !!!iiA.FETV CD-, INC .
P.O. Box 6356 Visalia.. CA 93290
Ph# 559-732-0393 Fax# 559-732-2684
Bill To
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD. CA 93380-1977
P.O. No.
VR0337
Date Item
Terms
Net30
Description
Invoice
Date
6/16/2023
Job Info:
9-22-01/CJTY OF VISALIA DOWNTO\VN ST LIGHT
VISALIA
VR0337
Due Date Ordered By:
7/16/2023
Quantity Rate
Invoice#
59609
Amount
t/5
r 06/04/2023 2 man00I 2 man lane closures - 1-8 hour Sunday shift 1 2.215.50 2.215.50 Cit
(;~
~Ir-
C/1
06/04/2023 Overtime Overtime - Per hour (8-12 hours)
06/05/2023 2 man 001 2 man lane closures • I -8 hour shift 06/05/2023 Overtime Overtime - Per hour (8-12 hours)
06/05/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) 06/06/2023 2 man 001 2 man lane: closures- 1-8 hour shift 06/06/2023 Overtime Overtime - Per hour (8-12 hours)
06/06/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) 06/07/2023 2 man 001 2 man lane closures - l-8 hour shift 06/07/2023 Overtime Overtime - Per hour ( 8-12 hours)
06/07/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) 06/08/2023 2 man 001 2 man lane closures• 1-8 hour shift 06/08/2023 Overtime Overtime• Per hour (8-12 hours)
INOEMNl"TY AGREEMENT. All item~ cov-cred by th;~ Ooc:ul'Tl~nt,sh~U be otth~ ~ol,c r1~k of 'the Cv:-itOn,'C'~ c .... ~tome..- oi:...-c o::;. 'to defend., 1ndcmn1fy ond hold h.armle~:;. "RC ~.CTV ~O .. •t-:; off1c-:~. d1r.,.cto~ .and 11!:n"lC,loy-e--e-'!,.. f'ron-. zii,...d a.1.:~~t Z'!lny l'll..--d ~I h~tio.li't'y ,<:l:,,,.t~:-:=,.Judi::t•Y'•O:-"'t~,. r.o~t<I=., attorr,ey fee~. or demand~ of 111> ,:-a'ti on an:unr from t:.he!: uso::, r-n:e,1 n1::enano::c. op'='r41t1on. or ,:;.0~$-:-~~ Qn of. 'thc ,eQv~ pr-ncnt 1nc:ludlnc but: not l1m1t~d t:<:>~ tho~~ ....,.,.,~n:c:~rQrn th~ ~cttv,e n-:~l1s:~ncc of KRC s.Ar-.e'TV co ... it~ office~. d,,,.~.:.to~ ~n<J <-1"'1110,~Qy,ec~ .. 1'rorn JnJuty to or dc:Sth of th~ Cv~tQmc-r, Cu~tomc,..-~ ~rnplQy,c,e~. or ~ny other p,.e:r~on,. ,:w frorr. d~n\a~e to ~ny propcM:y., :-ave &nd ~c:ept: 'th~r'"e ~hoU b~ no, oblJ~t,on ori the part o1 the Custo rnr.r to d r::fc:nc:S. 1nd~mn,fy .i,.nd hold t-w,,rml-:~~ KRC SA.FETY CO .. •t:~ office~ .. d•~ct-o,--:;. ond et'T'lptoyce!#. It' the 1,ab4hfy. c;:IJ:Mrn-s, .Ju<.1:.P"n,en,:~. co::;;~o't'tOr""no:-y-:; fo;:r.~ .. ,o,r d-:mond:;. ot U't:Ji;:otion ot:h,e'""'-"t~"! i;:tv,n: r"I -.:.e 1::0 -.:.~c:h ol;J,~t•Or-. 3rt?,;,e f'rO..-n th-:- -sole n,es;J •s::-:.-nc~ or-willful r'ftl,!;COr.du,ct: 01' KRC s.A,,: !:TV co ...
Jt-;. offic-er...,. <ilr~ct.or!',, .:,nd O::n"IOloy.:cs. If CU$tOm"!T" rdv:$."!::::'to di:+o::nd .. •ndcmnify -nnd hold horrnl,e,~:; KR:C ~ETY CO. tt-.:. ott,ce~. (31rec::tor~. i:,nd c ....... ployco:~ .ond :-u~-:-quent.ly .o deb:rmin:,t::1Qn I$ "'~d,e, th~t liot,,ihty 1-s not: dv"! i::o «::h-: ::;;ol-: nct:l•i;-:~r,c-: orwtllf'Uf ml~onduc1: of t(RC ~£TY CO .. •t::;; offlcorr, Crector,s. ar:.d ""rnploye-:..:. Cu-;t:orn-:r 1,:;; obJ1~t,ed ,:o r"o!.>tmbur~,e :ztr"r)I -8nd &U h~bl hfy, Cl o•rn-i:: .. Jud:crn-:-nt:s .. co~,:,_ ottor-ncy, fee~. or deni..ond~ ot htl:S::::)t:ton 1r'\Cvrrcd by KFl:C: S~At:l'Y co ... tt~ off,cen:.-. d1rec1:or-:::.. ~nd ~f'T'IPIOYr.o::-~. Co.J~'tOr'Tlc:-r oi,?.r"ecs to nottfy K'.RC SAPETV- CO., tn'trTH!!dl~t~ly Inc~"' of ;:,ny ;o,,e~dent: ond t:o obt.1>1n i:h«:: .n.i:,r'nc~- .odd,..~~~~::. ta,l,cphon-e nun,b~r~ and oth..,.,- Pot:r"tln"'nt 1n1'o~rn.:o,tton from ;:,II p,3r1l~!:
1nvotv-cd .and ,13JI _._tn-ess,e:!!;.
6 1!5.00 690.00
l L555.50 l.555.50
7 I 15.00 805.00
I 75.00 75.00
I 1.555.50 1.555.50
8 115.00 920.00
1 75.00 75.00
1 l.555.50 l.555.50
9 115.00 1,035.00
I 75.00 75.00
I 1,555.50 1,555.50
6 115.00 690.00
Sales Tax (8.5%) $0.00
Total $12.802.50
Payments/Credits $0.00
Balance Due $12.802.50
Contract Hrs CT ROW EW HRS Supervision HRS
2.00 2.00
8.00 10.00
8.00 10.00
10.00 28.00 2.00
Hours % worked 26% 74%
KRC Invoice 59609
6/5/2023 2-man lane closer 1-8 hour shift 1,555.50$ 409.34$ 1,146.16$ Split per % worked 6/5/2023 Overtime (8-12 hours) 805.00$ 805.00$ OT on CT ROW EW only 6/5/2023 Arrow Board 75.00$ 75.00$ Arrow Boards on CT ROW EW only 409.34$ 2,026.16$
CR63.02 Rpt 4, Amount 2,026.16$
A-C ELECTRIC COMPANY
Job Cost History Report From 06/06/23 To 06/06/23
UnPosted? Including Payroll and A/P Invoices in Progress Tran
TypeDate Reference Description Additional Information Hours Job: VR0337 DOWNTOWN STREET LIGHTS
Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR
06/06/23 PR LYONMR MARK R LYONS Check# F43421 2.00
06/06/23 PR LYONMR MARK R LYONS Check# F43421 2.00
Subtotal for Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR 12.00 Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR
06/06/23 PR MARTJ6 JOSE M MARTINEZ Check# F43302
8.00 06/06/23 PR ANDRKL KEVIN L ANDRADE Check# F43393
10.00 10.00
8.00 Printed by SMF as of 01/24/25 2:14PM
Subtotal for Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR 28.00 06/06/23 PR ZAVAR0 ROBERTO ZAVALA Check# F43450
06/06/23 PR LYONMR MARK R LYONS Check# F43421
�
BADGER
OA.VUGH'flNQ"
A-C ELECTRIC COMPANY
POBOX81977
BAKERSFIELD, CA, 93380
Job Name: Downtown Street Light Project- Visalia
Trenching
Site Location: LOCUST ST Visalia, CA, 93277
Requesters Name:
Cost Centre/GL: Major/Minor:
Badger Contact Info: 3054 East Cartwright Avenue
Fresno, CA. 93725
Ticket Number:
Ticket Date:
CA License #945499
TKT-060423-907009
06-05-2023
Job Number: SR0000400085
Paper Ticket #:
PO/WO #: VR0337
AFE/JOB#:
Phone: 559 2332208
Rig/Well Pad #:
Job Name: User/Approver ID: Other Order #:
Item
Badger Hydrovac With Operator
Overtime
Consumable Materials
Supply Water
Disposttion
Fluctuating Fuel Recovery
Notes:
Approved By:
Approver Name:
Approver Phone #:
Item Description
This is not an invoice
Total subject to change based on taxes, fees and other charges.
Unit# Quantity Rate UOM Amount
819 11.5 $350.00 HR $4025.00
819 1 $25.00 EA $25.00
819 1 $80.00 EA $80.00
819 1 $0.00 EA $0.00
819 $351.88
Ticket Total: $4481.88
Unless Buyer e:,,:pressly advises otherwree, Buyer represents and warrants that the soil and gr01Jndwater in the area of the Hydrovac excavation operations is not contaminated wllh any non-naturally occurring substance, and buyer hereby indemnifies and holds Badger Daylighting Corp (or LP in Canada's case), and its directors, officers, employees, agents, and contractors harmless from all losses, costs, expenses, i:ind penalties which it or they directly or indirectly ruffer or incur in the event lhe soil and or groundwater is contaminated with any substance other than naturally occurring substances.
Subtotal $4443.00
Tax $285.84
Total $4728.84
Taxable
========~--
INVOICE JUN 1 2 20
VIKING READY MIX SALES
1830 S. MILLIKEN AVE., BUILDING G • ONTARIO, CA 91762
(909} 657-4000
00001 234 06/06/2023 308842
SEND PAYMENTS TO:
AC ELECTRIC COMPANY
P.O. BOX 81977
BAKERSFIELD, CA 93380
!(~~~"i;~tt r~~~~1~m~istt~r - ~
~ 1ji~~~~~1t' i'~t~J.lj,JU~·;
1 VIKING READY MIX CO., INC.
C/0 VIKING READY MIX SALES
15821 VENTURA BLVD., #4 75
ENCINO, CA 91436-4778
;7,?:!k~~"lfilim:-~:lg:t~
~~l1¥I~1[~i1~f;I
7319 w ACEQUIA AVE & s LOCUST ST VISALIA
- --- ·--·· PO NUMBER: ·VR0337 ·
06/06 116-210230 9 . 50 CY 5.37SK lAGG FA 130.220 0 . 00 06/06 116-210230 76.00 MN DELAY MINUTES 1.500 0.00
06/06 116-210230 1.00 LD PUBLIC WORKS DELIVERY C 200.000 0.00 06/06 116-210230 1.00 LD ENVIRONMENTAL FEE 40.000 0.00
06 / 06 116-210230 1 .·00 LD FUEL SURCHARGE 40.000 0.00 06/06 116-210230 1.00 LD LOW CARBON FUEL - SURCH 15.000 0.00 / 1J6706 116-210231 9.50 CY 2.00SK SAND SLURRY 118.000 0 . 00 I
I 06/06 116-210231 1 . 00 LD PUBLIC WORKS DELIVERY C 200.000 0.00 06 / 06 116-210231 1.00 LD ENVIRONMENTAL FEE 40.000 0.00 · 06/06 116-210231 1.00 LD FUEL SURCHARGE .40. 000 0.00 06/06 116-210231 1.00 LD LOW CARBON FUEL - SURCH 15.000 0.00 µ 06 / 06 116-210231 1 . 00 EA RETURN CONCRETE SURCHAR 150.000 0.00 1·
06 / 06 116-210232 9.50 CY 2.00SK SAND SLURRY 118.000 0.00 \ \ 06/06 116-210232 1.00 LD PUBLIC WORKS DELIVERY C 200.000 0.00 \ 06/ 06 116-210232 1.00 LD ENVIRONMENTAL FEE 40.000 0.00 '1 06/06 116-210232 1.00 LD FUEL SURCHARGE 40.000 0.00
06 / 06 116-210232 1.00 LD LOW CARBON FUEL - SURCH 15.000 0.00 06/06 116-210233 9.50 CY 2.00SK SAND SLURRY 118.000 0.00 I
06 / 06 116-210233 30.00 MN DELAY MINUTES 1.500 0.00
06/ 06 116-210233 1.00 LD PUBLIC WORKS DELIVERY C 200.000 0.00 06/06 116-210233 1.00 LD ENVIRONMENTAL FEE 40.000 0.00
\ 06 / 06 116-210233 1.00 LD FUEL S'CJRCHARGE 40.000 0.00 ~ 6/06 116-210233 1.00 LD LOW CARBON FUEL - SURCH 15.000 0.00
JOB TOTAL LINE
\,"--. _ _ ............ ..
PRODUCT RECAP
1 2. OOSK SAND SLURRY! 28.50 NS20
9 . 50 ND10521 5.37SK lAGG FA
106.00 543 DELAY MINUTES
4.00 555 PUBLIC WORKS DELIVERY CHARGE
4.00 530 ENVIRONMENTAL FEE
4.00 520 FUEL SURCHARGE
4.00 525 LOW CARBON FUEL - SURCHARGE
l"ERMS: Net Due on Receipt. Delinquent if not paid in full within 30 days of invoice date.
Jelinquent accounts are subject so suspension and closure without further notice. In the went legal action is taken to collect this account, reasonable attorney's fees and costs will >e paid by the Customer.
1 1237 . 0.
•,
''---...o. o,
2 oo' :-01
40 . 01
40 . 01
15 (
1121 .·o
200 . 0(
40. 0(
40. 0(
15. 0(
150.0(
1121. 0(
200.0(
40. 0(
40 . 0(
15.0C
1121. oc
45.0C
200.0C
40. 0 0)
40.00 15. 00)
5975 .1)'9
INVOICE
VIKING READY MIX SALES
1830 S. MIWKEN AVE., BUILDING G • ONTARIO, CA91762
(909) 657-4000
00001234 06/06/2023 308842
AC ELECTRIC COMPANY
P.O. BOX 81977
BAKERSFIELD, CA 93380
'·'·,:�_.;f¼/-S:i.);n_:•\J'.':'i:·''s!f.';'.;10'.
SEND PAYMENTS TO:
VIKING READY MIX CO., INC.
C/O VIKING READY MIX SALES
15821 VENTURA BLVD., #475
ENCINO, CA 91436-4778
":·\,;;{;n:.::i,:.;;:J::;;;(,;/\,i "
.i;i��;N'q;� 6';? r:rl�:�)�'.1$}.1:1t1�Ji;::1- " .,._ .... . --· _ :.,�{::;f,::�;j�{�H)l'.1;::�,:f:;
1.00 535 RETURN CONCRETE SURCHARGE
ERMS: Net Due on Receipt. Delinquent if not paid in full within 30 days of invoice date. elmquent accounts are subject so suspension and closure without further notice. In the ,ent legal action is taken to collect this account, reasonable attorney's fees and costs will � paid by the Customer.
TAXABLE AMOUNT
EXEMPT AMOUNT
SALES TAX
o/o
59�. 09
/ 0.00
;~fl~~llml;$$.'i'h-lt@i • •
,.,., · ' ~~J,Y:;'.t"
' •••• - • • , . ' ------- ----------- --
/
5975.09
1 Day
Total $127.69
OUnited Rentals·
Mut:2 641 lUN 9
4 WEEK BILUNG • D 2023 INvo,cE
935 IIOli.'131 1llW MADDOX !ill'
VZB.lLL\ CA 932S2-663Q
~!9•6-27-!.1:ta
_3 A-C ELECTRIC VISALIA BRANCH
"" 1035 W MURRAY AVE
It.I VISALIA CA 93291-4721
~ Office: 661-410-0000 Cell: 559-679-7286
1.1.30511 MB 0.528 e1oess::u.p0r 288171 1-i o
11d1f"11 ,, 11 rlnl• 11f1ull rll• 1111 rf •r1• lllh" uuf ul rll(lld
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL J:TEMS:
~ !guipment Description
1. 10514906i"" 'l'RAILER-rt:I.T i2•-i6' ro 1;99~~ • ·
Make: TOlf MASTER Model: T-9DT 16'
Serial: 41CNBT232SKL162613
1 10595346 MINI EXCAVATOR. 7400-9199#
Make: TAXSUC'HI Model; TB240
Minimum
serial: 124002620 Meter out: 1435.80 Meter in: .oo
l 907 /0525 M!NI BXtAVA1'0R BUCICBT 12"
SALES/MISCB:c.LANEOUS IT~MS:
_ __.Q"""'t.._y !teat
l CA PERSONAL PROP TAX REIMB Cl!ARGB
COMMim'l'S/NOTHS:
comACT; JOB MBRCADO
CELL#: 559-556-578~
!DRSURcA/MCI l
# 213802575~007
CuatCIUlt i
rsivoic• Dat■
l)at:e out
Bill ■d 'l'hrough OR Jcb Loe
: 156339
: 06/01/23
: ll/30/22 03 :30 PM
: 06/14/23 00: 00
: 1035 W MURRAY AVE, V
: 430 Ult Job t
CUatcaner Job
P.O. I
R•~•t•d By
••a■rved By
Sale•pe:z:•9011
I!):
~ VR0337
: JOE MERCADO
t CLIE'FGENaSIS SALUDBZ
: BR¥N WHITE
Invoice Amount: $2,553.88
T11m1: 0111 Upon Receipt
Ptyment (lflllOna: C!inlllct OIi' Cid office 70,H18-487? REMrT TO: UNITEO RENTALS (N0ATH AMEAICA),JNC.
P.O. BOX os1,22
LOS ANGELES CAS0074-1122
All\<Junt
312.00
Price
1(.070
1,034.00 1,876.00 1,876.00
N/C
Rental subtotal : 2 , 3 3 9 , 73
Unit of ?Ilea.sure Extended Amt.
BACH
Sales/Misc
Agreeinent
SUbtotal:
Subtotal:
Tax:
TOtal:
l,4.07
J.4.07
2,353.80
200.oa
2,553 .88
Billing period: 28 Day& From 5/17/23 03:30 PM Thru 6/14/23 03:30 PM I I
•U•c:tiv• JatlWlry 1, .2021 end 1rhe:• P11nlitt&d l:ly law, ll'Q.ited ae:iiu.ls ma.y impoH a •ui-cha:rge of 1,6\ for c:radit card p~ts on c:barlie •c:cowit11. Thi• •ure~ .ii 110t greater t!lazt ow:- miar,::h...t d111cowit rate fOr c:redit card tr&i:11acti<:1ns Gd :I.• SUl>:f•c:t tx> •1Utilll tn in 1cmei ;jurUdictia:11•.
JltO'r:l:C:B, Thi• i:nvoic: ■ if 1ubj ■at to th■ tema ud c:Ollditiou of tll• .Reut.1 and servic:e ~-t, -..luah &rfl available •t ..... -.11- .... ~ ........ _l!.al.•.-/1-11r-r:a1-aervic:•-t•aa••VS IUld. lthic:ll. 11re i=eo~at:ad ht1rdt1 by i-et:•r91lC•· A con or nm amt'l'll i'ALAMEDA
AED/CST Br11
7044AVE304
PO BOX760
ELECTRICAL DISl'RIBUTORS GOSHEN CA 93227-0760
559-651-2096 Fax 510-785-4457
A-C ELECTRIC
HOUSE ACCOUNT VISALIA
POBOX819TT
BAKERSFIELD CA 93380
3M SPB-01 WIRE MARKER BOOK 0-9
Your#WIRMARK09
CST PALLET WATER 16.9oz-CRYSTAL
(35/CS, 54CS/PALLET)
- CRV $1.75/CS INCLUDED ....
.,...._._ .....
-•• Kit Components--••--••--
• 54 - CRYSTAL GEYSER 35 CST BOTTLED
• WATER 16.9OZ (35 BOTTLES/CASE)
• (54/CS/PALLET) •
•
•
• 54
- REDEMPTION CA VALUE TAX- CRYSTAL * • (35/CASE QTY CRV) • .... ,, ____ .,,.,,.,,._..,.,.,.,._
ELECTROTAPE 86522-CST YELLOW
CAUTION TAPE "CAUTION" 3" X 1000FT
- 2mil W/ "CALIFORNIA SERVICE
TOOL" IMPRINT (86522/86501)
Your# TAPECAUT6X1000
PVC 1 QT CEMENT CLEAR
RE 14-THHN-STR-RED CU 500FT SPOOL
INVOICE
ALAMEDA ELECTRICAL DISTRIBUTORS.INC
3875 Bay Center Place
HAYWARD CA 94545
SHIP TO:
A-C ELECTRIC CO - HOUSE VISALIA
1035 WEST MURRAY AVENUE
VISALIA CA 93291
6 6 13.2200/ea
1 486.0000/pl
8 8 12.4000m
(�
1557.1000/
500 116.5000/m
79.32 486.00
99.20 !Sl I
58.25 1)71, I
ENROLL TODAY! , q
Go To https://alamedaelectrlc.billtrustcom Use the enrollment token at the bottom of this invoice.
Have access to your invoices 24fl
Thank You For Your Business!
Web Enrollment Token: KGH PL T ZWQ http�lalamedaelectrlc.billtrustcom SUBTOTAL 1.W6:'l7
FREIGHT
SALES T
AX,__ _ ___;_oc_;_. o.:Jo
AMOUNT DUE 10,9&.47
All claims for shortage or errors must be made at once, returns require written authorization and are subject to handling charges. Special orders are non-returnable. This order is subject to the terms and conditions of our credit application. Overdue accounts will be charged a finance charge.
!!!!1 AU\ME:DA
ALAMEDA ELECTRICAL DISTRIBUTORS,INC
7044AVE304
PO BOX 760
1 El.ECTRICAL D!SJRJEUTORS ' GOSHEN CA 93227--0760
559-651-2096 Fax 510-785-4457
A-C ELECTRIC
HOUSE ACCOUNT VISALIA
PO BOX 81977
BAKERSFIELD CA 93380
PVC 3-IN 300 SCHEDULE 40 PVC
CONDUIT 20FT LENGTHS
INVOICE
ALAMEDA ELECTRICAL DISTRIBUTORS.INC
3875 Bay Center Place
HAYWARD CA 94545
SHIP TO:
A-C ELECTRIC CO - HOUSE VISALIA
tipton and oak ave parking lot #44
VISALIA CA 93291
Go To https:J/alamedaelectric.bllltrustcom Use the enrollment token at the bottom of this invoice.
Have access to your invoices 2417
2 Thank You For Your Business!
SUBTOTAL
FREIGHT
SALESTAX
ii--__ a_.00
-l
"
AMOUNT DUE Web Enrollment Token: KGH PLT 'ZWQ htlp1/alamedael&Cbio.bllllrust.com All claims for shortage or errors must be made at once, returns require written authorization and are subject to handling charges. Special orders arenon-returnable. This order Is subject to the terms and conditions of our credit application. overdue accounts will be charged a finance charge. 131142 02
C,o I'\ f:. r ~
I
9 .h.--
g/2 ,&~
&9-~
r--~-~-.. ---------------=e:-::N=Ro=-=-L-=--L=To:-:l:o:-::Av:-::-1--..J_ __ __.1__ ___ _J_.,,,,,,; I ; 4J .1.311 4i!. 02
1-$12.38 W/Tax
6-$65.10 W/Tax
2-$45.94 W/Tax
~ 1 IU..A.MEDA
/ ElECT/llCAL DIS;RIBlffORS
A-C ELECTRIC
AED/CST Br11
7044AVE304
PO BOX 760
GOSHEN CA 93227-0760
559-651-2096 Fax 510-785-4457
HOUSE ACCOUNT VISALIA
POBOX81977
BAKERSFIELD CA 93380
78547
Your# PVC90Ell300
PVC 3-IN 30090/36 36RAO 90DEG
068767
Your# PVC36RAD90ELL300
30045 450 COND EL
PVC 1-1/2 11245 450 COND ELBOW
Your# PVC45ELL 150
PVC 3-IN 300BE END BELL
Your# PVCBELLEND300
PVC 3-IN 300CP CONDUIT CPL
Your# PVCCOUP300
PVC 1-1/2 11290 90D COND ELBOW
(GSI)
Your# PVC90ELL 150
INVOICE
ALAMEDA ELECTRICAL DISTRJBUTORS,INC
3875 Bay Center Place
HAYWARD CA 94545
SHIP TO:
A-C ELECTRIC CO - HOUSE VISALIA
tipton and oak ave parking lot#44
VISALIA CA 93291
120 120
257 257
~~51 251
330 330
575 575
1020 1020
/4o1 218
3247.06
2570.00
5315.30
~8.81
2678.39
2196.67
-s6a
~
ENROLL TODAY!
Go To https:1/alamedaelectric.billtrustcom Use the enrollment token at the bottom of this invoice.
Have access to your invoices 24rT
SUBTOTAL
SALES TAX .oo Thank You For Your Business! y
FREIGH
T k KGH PLT Z.WQ :J Joo SSlS,16 1007 197 1.08 Web Enrollment o en: http· /alameciaeleetric.bllltrust.com All daims for shortage or errors mu. st be made at once, retums require written authorization and are subject to handling charges. Special orders are (, non-returnable. This order is subject to the terms and conditions of our credil application. Overdue accounts will be charged a finance charge.
Pag 1 of 1
AMOUNT DUE
CALTRANS ROW
CITY OF VISALIA DATE: 7/26/2023
VR0337 DWR DATE: 6/7/2023 SOS 6/6/23
AREA DWR NO.: 142629
CONTRACTOR REPORT NO. Rpt 5
CR NO.: 63.02
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV707 DUMP TRUCK 3 YRD TRUON TRUN 2AXL 8 45.02 $ 2 0.81 0.21 433.09$ 2 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 2 0.87 0.15 523.23$ 3 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 2 0.86 0.15 73.97$ 4 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 0.87 0.15 199.84$ 5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 1,230.13$
15% Markup 184.52$
Total Equipment 1,414.65$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 213602575-007 UNITED RENTALS 6/1/2023 1 $ 127.69 R $127.69 11 59609 KRC SAFETY CO 6/16/2023 1 $ 1,928.30 S $1,928.30 12 2529610 BADGER 6/8/2023 1 $ 4,481.88 S $4,481.88 13 14
15 Subtotal Material, Subs, and Rentals 6,537.87$
15% Material Markup -$
10% Sub/Specialists Markup 641.02$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 7,198.04$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-GF GEN FORMAN MARK LYONS 54.38 $ 27.98 $ 0.11 8 81.56$ 28.80 $ 0.11 979.99$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 10 66.35$ 28.34 $ 0.11 1,051.01$ 100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 10 75.04$ 28.60 $ 0.11 1,150.39$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 3,181.39$
35% Mark Up 1,113.49$
Total Labor 4,294.87$
SUBTOTAL 12,907.57$
-$
12,907.57$ T OTAL COST THIS REPORT
A-
C JOB NUMBER
CUSTOMER JOB #
DESCRIPTION
A-C Electric Company
CUSTOMER
REFERENCE
Start of shift 6/6/23 Remove trench plates, pothole trench, install conduit, slurry back 13+59 and reinstall trench plates Invoice Description
MINI EXCAVATOR W/TRAILER
TRAFFIC CONTROL
HYDRO EXCAVATING
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 June\CR 63.02 June EWBPrinted 2/7/2025 A-e c� e� -CALIFORNIAC-10LICENSE99849
ENGINE E Rl NG-CO NSTRU CTI ON-TECH NO LOGY-SERVICE
Daily Work Report
DWR #: 142629
Submitted By: MARK R LYONS on 6/7/2023 8:47:11 PM
Job/Work Order Number
VR0337
Date
2023-06-07
CCO No./Area
Required for M and R jobs
CR63.01
Site/Location
Court
Division
Visalia
Description of Work
Job Name
DOWNTOWN STREET LIGHTS
Job Home Local
100
P.0.Number
Customer
CITY OF VISALIA
Local ReportingTo
100
QuoteorT&M
0 Quote
Work Completed?
0 Yes � No
�T&M
Remove trench plates, pothole trench, install conduit, slurry back 13+59 and reinstall trench plates.
Employees
Technicia n
···---- ---------
MARKRLYONS
KEVIN LANDRADE
ROBERTO ZAVALA
Materials
Qty __ U'--O'-'M-'-----
0 Equipment
A-C Owned/Rental
A-COwned
A·COwned
A·COwned
A-C Owned
Rental
Rental
·"- -- ----- --
Dispatch Time End Time Class -- --- --------
08:00PM 04:30AM GF
08:00 PM 06:30AM J - "·· ---- ------- --
08:00 PM 06:30AM F
Material Vendor/Truck Stock
Hours
10 ..... _.t<: CEq: #/Ren_tal A?ency
MV707
ST
0 8
-- - -- ----------
OT DT TT Adders
0 0 0
0 10 0 0 0
0 Miles
0 10 0 0 0
Packing Slip No. . ... ···· ··· ···· ... .... ...... .
Equipm�nt_D�cription
Dump truck . ............ - ----- -------------
10 MV 653
10 51547
··------
8 MV 541
10 10949061
10 10595346
---- --------
0 0
0 0
0 Hwy truck
Light tower
Foreman truck
Trailer
Mini ex
Verd
0 0
0 ----- --------- --------- ····- ····- .. •····•-•-·········-·····- ····-··----- l. ____ _
I
I
(
'
i .......... ...
I ·1
--------- .. ·- - --· '
I
-------------·· ············---~---------- ---··-- -···········--···--·--------- Subcontractors
Ticket No.
907007
Approved By
Customer Representative. ..
James Grier
Completed By
Field Representative. ..
Mark Lyons
Comp�ny
KRC
Badgers
Traffic control
Pothole trench
- . .. .. . .
Customer Signature
';y�G--t:R c._ 'i' \I r 5
Field Signature
Subcontract- Direct Job Item
��
Add Signers
0 Yes
--------- ------------== ==--1 -· ... ----------
1 Day
Total $127.69
OUnited Rentals· 'JUN 9
'WM 4 WEEK BILLING
!tlWfl::II' 6f .1 ,a5 JllmT.ll BBN JW>DOJ:: IU.l'
V:SALU CA !13:Z!l:l-6G.2 Q
5$!1-6.i7-$l:r.-
0 ~ INVOfCE
# 213M257S-007
,8 A-C ELECTRIC VISALIA BRANCH
..t 1035 W MURRAY AVE
0l VISALIA CA 93291-4721
Cuatcmer i : 156339
Invoice Dat• : 06/01/23
Dat• Out : 11/30/22 03.30 PM
Dilled ~h : 06/14/23 00:00
11R Job Loe : 1035 W MURRAY AVE, V
~
t1R Joh I : 430
Cv.llltcmer Job Ir>;
P.O.t :VR0337
Office: 661-410-0000 Cell: 559-679-7286
7,1-30511 MB 0.528 81085S2l.p0T 289171 1-2 O
1 1
d1ln1
1 ,,., rlnl ulf 1nluH 11
11 1 •f ,r
1 •JHh JI "II, .. , ,lliJM
R•ql,\eated By : JOE MSRCADO
ll•a•rv•d By I CLIFFGENESIS SALUDEZ
Saleaperaon : BRYN WHITE
----,
Invoice Amount: $2,553.88 ~
AC ELECTRIC CO BAl<ERSFZELD CA.
l?O BOX 81977
··------·--------··~-----1
Tem111: 01111 Upcn R8Qllll,II
Paymenropaor.; C0ntlc:I 01M'~Ollic9 104,gfMSn
BAICERSFIELD CA 93380-1977 REMIT TO: UNITED RENTALS (NORTH AMEAICAl,INC.
P.O.BOX0511~
LOS ANGELES CA il0074-1122
Desc:ript:ion Mini11111111 ~ \ Week 4 Week Amount
- (-. :iB ;71-) .J.72r;t3-- - -~~ - · l 10949061°
0 TAAILS!f TILT 12 • -i6 • ro s1";99~~ • • -
Make : TOW MASTER Model : T- 9DT 16 •
Scri«l: 4KNBT2l25l<Ll626l3
l 10595346 MINI BXCAVATOR. 7400-9199#
Make: TAKBOCHI Model; TB240
(
Serial: 124002620 Meter out: 1435.80 Meter in: .o
1 !907/0525 MINI EXCAVATOR BUCl<BT 1.2''
312.00 1,034.00 1,876.00 1,876.00
N/C
SALES/MISClU,LANBOO'S ITEMS :
_ __,oto..;;..,.y Item Price
Rental Subtotal, 2,339,73
Unit: of Measure Extended Amt.
1 CA PBRSONAL PROP TAX RBIMB CHAR.GB
COMMRNTS/NOTBS:
CONTACT: JOlJ MERCADO
CELL#: 559-556-5783
[DRSURCA/HCil
Billing period: 26 o«ys Prom 5/17/23 03:30 PM Thru 6/14/23 03:30 ~M 1(,070 BACH
Sales/Mia<: SUbtotal:
Agreemellt Sul:ltotal :
Tax:
TOtal:
i4.07
J4.07
2,353.80
200.0&
2,553.88
--t!-----,.----- .. -•• -,....;.------~---~--..~--;-·-----------·----------·---'----..,:...,,_--J __ BftKtiv• J■nuary l, 2021 tnd whlitr• p■ t111tted :by law, U'!Uted Rwtals may imposa a •~rcwg• of 1.8\ for cndit card pa~te c;m ~fl account:B. "rhi ■ &urc~ i• :aat gre■ tar than our JDerch~ dJ.11eo1mt ra~ for cr•dit care! l:r&:aaact:J.~ all4 :I.■ aub~act to ■al•• t&:1< b, ICIIU!! juril~dUgna.
l(()f:CC:a: Tlli• iuvoic: ■ is aubj ■ct to tb• te=s llDd condition., of tb• llel:ttal and serviea ~•-t, wbieh are available at ~---~.1J- "ftl ►•~~-t.aia_,,_11 .... 1/rctal- ■•rvi~•-t•i:mt1-U& IIDd ~cb are iceorporated h•~•i~ by refu«IC•- A COPY or nm mart.AI, Please see cost break down on next page
It--·')
r
'.ff I/
I
A
)
(;
/If .-(
/
(~ / /,,-., . ,.
I
TRAFFIC CONTROL~ SAFETY SUPPLIES~ EQUIP:tvIBNT RENTAL~ TRAFFIC DESIGN Invoice
!!iA.FETY C:D~.,. INC:.
P.O. Box 6356 Visalia. CA 93290
Ph# 559-732-0393 fax# 559-732-2684
Bill To
Date
6/16/2023
Job Info:
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD. CA 93380-1977
9-22-01/CJTY OF VlSALIA DOWNTOWN ST LIGHT
VISALIA
VR0337
P.O. No. Terms Due Date Ordered By:
VR0337 Net30 7/16/2023
Date Item Description Quantity Rate
06/04/2023 2 man 001 2 man lane closures - 1-8 hour Sunday shift 06/04/2023 Overtime Overtime - Per hour (8-12 hours)
06/05/2023 2man00l 2 man lane closures • 1-8 hour shift 06/05/2023 Overtime Overtime - Per hour (8-12 hours)
06/05/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) 06/06/2023 2 man 001 2 man lane closures - 1-8 hour shift 06/06/2023 Overtime Overtime - Per hour (8-12 hours)
, '"' r •-,..,..._.. ,m, ,; Arrowboard - A ... Additional arrow board(s) oer shift (includes lane) 06/07/2023 2 man 001 2 man lane closures• J-8 hour shift 06/07/2023 Overtime Overtime• Per hour (8-12 hours)
06/07/2023 Arrow-board - A ... Additional arrow board( s) per shift (includes lane) 06/08/2023 2 man 001 2 man lane closures - 1-8 hour shift 06/08/2023 Overtime Overtime - Per hour (8-12 hours)
JNOEMNlTY AGREErJIENT. Afl item:: <ov~rcd by thJ~ Oo,:;umen~~h~t be bt; the ~otc rl,::.1' Qf 'thc Cu:;:comi11:1· (;y::..to1-ncr o,crc e~ "'o <Scfcod,. tr,def"'h'1ify .::11nd hold hormlc-:::.- K~C $A:FC:TY CO.,. 1,;~ Q.ffl<1¢"r.,.,. di,.4:'t:tor... .nnf'j c:n'lploy.:<e'-. from .nnd :.:iit;~r>!;l.t; ~"Y :::,nd =l:111 H~t,.tll"ty clNm~ .. Juds:m~nt.~ .. CO~•ts., .:!!lt.'tO~ncy 'fcc-s. or dcrn~nd::. of U'bS'btic:>n orl~n!: from th-e- u::.:oe,. n-.~•intcnonct .. op,en,ition., or po~e:,~on oft~'!: c:Q..-IP"'IC:'nt ,nctudans:; bu~ no~ UmU:ed 'tO~ t.ho::;.c :car-l:;£nirfrom the octlva: f'l~:t:11£:c.-.cc. of KRC :s.Arf!TV CO.,. It$ offlc:-=n;., ,:H..-cctot~ ~nd employc-c~~ 1'r"Or"n tnJ'-'t'Y to or deat,h ofsrhc Cu-::.tomc,.. Cu:;:comc,...~ ~rnplO')'~e~,. ol"".any c>th11::r p11:r'~On,. ,oi..-'fr-om d.::.m.:=.:::e t:o ::1ny pr'opcr"ty., ::.~v1:: :ond c-xc:cp-et:h~r'c ~hall b,e no obl•pt1on on the p;o"' of t:hc Cvs.tonu:-t· ,:c, dcFcnd_ .s.nd.lt"ff.lntfy ,ond hold h.::;Jirrnlc~-:, KRC SAFETY CO .• It:~ off1ccl'"$,.. dh'·,e,,ctor~ ... :ci,nd crnployc e:;.. .. It 'the l~cbl;Uty 6 cl~m:;., J ~d.z;.rncnt.:,. co~t:~ ottorn,ey$ fee,:;,. or demcnd:,. ,o,: litj~'tl on oth~ -::e c•vtn-s: n-:.:e t::.i> "!-,u<h Qbh~uo,n~n::~ fr'om ~he -:;oJc nc:;:lii:,cr\Cae ow-wJlltuJ n,,1::<:o.nduct: of' l<'R.C'SAFETV CO.,. lt:. officer.;: .. dar-:i:::1:0,~ .. and a:n,oJoyic<c.S. ,t C\A~'toMcr r'°ll:"fl,,j~cs t-o dd',:nd,. Indemnify ond hold h:onnlc:.-:.: t<A<:::
SA$ETV CO,. it:=. c,ff1~cl"J:o. .. dtrc~'tor::. 'Ond 1:.niployeic!S, .ond o;::ub:;,,cavcntlv ~ dctcrf"nin~tion I:;; m~de th.:,,t:
h.tablH~ 1$- no't due t:o the ~Ole 1'1,c:-S;l1s:c:ncc orw,Jlfvl rrd~c:onduct: o'f KRC SAFETY <:O.,. •t:: office..-., <Ur-ect:or-::- .. :,nd cmofoycc-:i:., C:u!:-tomcT" •~ obh:c;:t,"ted't:O re1mbur:::c ~.--y ::,("Id ~II h:,,bl hty,. dii,~~ .. Jud;emen~. co~t;. :ott0r"0cy~ feit;-;::. or dcnn::tnd::; of ht:1;;.Q1iol"\ ~ncvrT'Cd bY" 'KRC :!:.FAETY CO.,. t1:!: offtc-e~; d1rcc:tor,j'.., .::,nd emPIOY<c-C'-.::: CU::tt:Ot"'l'IS:r :::.:::r,eoe,-; t:o not:tfy KRC SAPETV co ... lrnmcdl~tc:-ly .,.. C~2! of.::.,ny ;:::,c-;c,d,ent ~nd t:Q ob'ta1n t.hc r,-o.-n,c:::. ~dd,.c~~~~. teli:phon,e, n.umbe-r:: z,nd ot.hf'::r pertinent: 1t"lf.Orrnat:1on fr-or'n :&II ~r'ttic~ 1,-.vQCvcd z:.nd ell ~t;nc~!Soca.
1 2.215.50
6 115.00
] 1,555.50
7 115.00
I 75.00
I 1.555.50
8 115.00
1 75.00
1 1,555.50
9 115.00
l 75.00
I 1,555.50
6 115.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59609
Amount
2,215.50
690.00
1.555.50
805.00
75.00 1.555.50
920.00
75.00 1,555.50
1,035.00
75.00 1,555.50
690.00
$0.00
$12,802.50
$0.00
$12,802.50
Contract Hrs CT ROW EW HRS Supervision HRS
2.00 2.00
3.00 7.00
10.00 8.00
10.00 12.00 18.00 2.00
Hours % worked 40% 60%
6/16/2023 KRC Invoice 59609
6/6/2023 2-man lane closer 1-8 hour shift 1,555.50$ 622.20$ 933.30$ Split per % worked 6/6/2023 Overtime (8-12 hours) 920.00$ 920.00$ OT on CT ROW EW only 6/6/2023 Arrow Board 75.00$ 75.00$ Arrow Boards on CT ROW EW only 622.20$ 1,928.30$
CR63.02 Rpt 5, Amount 1,928.30$
A-C ELECTRIC COMPANY
Job Cost History Report From 06/07/23 To 06/07/23
UnPosted? Including Payroll and A/P Invoices in Progress Tran
TypeDate Reference Description Additional Information Hours Job: VR0337 DOWNTOWN STREET LIGHTS
Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR
06/07/23 PR LYONMR MARK R LYONS Check# F43421 2.00
06/07/23 PR LYONMR MARK R LYONS Check# F43421 2.00
7.00 3.0006/07/23 PR MARTJ6 JOSE M MARTINEZ Check# F43302 06/07/23 PR MARTJ6 JOSE M MARTINEZ Check# F43302
Subtotal for Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR 14.00 Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR
06/07/23 PR ANDRKL KEVIN L ANDRADE Check# F43393 10.00 06/07/23 PR LYONMR MARK R LYONS Check# F43421 8.00
10.00 Printed by SMF as of 01/24/25 2:17PM
06/07/23 PR ZAVAR0 ROBERTO ZAVALA Check# F43450
Badger Daylighting Corp
BADGER
DAYUGKTJNG-
BILL TO
A-C ELECTRIC COMPANY
PO BOX81977
BAKERSFIELD, CA 93380
Customer Number
35951
Service Ticket#
Date
06-06-2023 TKT -060423-907007
06-06-2023 TKT-060423-907007
06-06-2023 TKT -060423-907007
06-06-2023 TKT-060423-907007
PO/Work Order
VR0337
Unit# Item Description
819 Consumable
Materials
819 Badger Hydrovac
With Operator
Overtime
819 Supply Water
819 Fluctuating Fuel
Recovery
·ll"lvOi�eNumber
Invoice Di,lte < Pay".lenf'f�rms
AmounlDue
REMIT TO
2529610
06-08-2023
90 Net
• )$ 4,481.88
Badger Daylighting Corp
PO Box 95000
LB# 1627
Philadelphia, PA 19195-0001
Bank Routing#: 026013673
Account#:03248177952
AFE/Job Badger Sales Area
40004
Qty
11.5 1
1 Unit of
Measure
Each
Hour
Each
Unit Price Amount
25.00 25.00
350.00 4,025.00
80.00 80.00
351.88 351.88
ITotal DuefUSDl I 4,481.88
Please see attached tickets for additional detail
Badger Daylighting Corp PO Box 95000, LB# 1627, Philadelphia, PA 19195-0001 Phone: (877) 322-3437 Please direct all invoicing inquiries to [email protected] and remittances to [email protected]
CALTRANS ROW
CITY OF VISALIA DATE: 7/26/2023
VR0337 DWR DATE: 6/8/2023 SOS 6/7/23
AREA DWR NO.: 142654
CONTRACTOR REPORT NO. Rpt 6
CR NO.: 63.02
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV707 DUMP TRUCK 3 YRD TRUON TRUN 2AXL 8 45.02 $ 0.81 0.21 360.16$ 2 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 0.87 0.15 429.76$ 3 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 0.86 0.15 60.88$ 4 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 0.87 0.15 199.84$ 5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 1,050.64$
15% Markup 157.60$
Total Equipment 1,208.24$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 59609 KRC SAFETY 6/16/2023 1 $ 1,907.30 S $1,907.30 11 303938 VIKING READY MIX SALES 6/7/2023 9.5 $ 174.87 M $1,661.27 12 309014 VIKING READY MIX SALES 6/8/2023 9.5 $ 174.87 M $1,661.27 13 213602575-007 UNITED RENTALS 6/1/2023 1 $ 127.69 R $127.69 14 2530178 BADGER 6/9/2023 1 $ 5,111.29 S $5,111.29 15 Subtotal Material, Subs, and Rentals 10,468.81$
15% Material Markup 498.38$
10% Sub/Specialists Markup 701.86$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 11,688.20$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 10 75.04$ 28.60 $ 0.11 1,150.39$ 100-FMNXFOREMAN ROBERTO ZAVALA - $ - $ 0.5 100.05$ 29.35 $ 0.11 71.82$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 10 66.35$ 28.34 $ 0.11 1,051.01$ 100-JWX JOURNEYMAN KEVIN L ANDRADE - $ - $ 0.5 88.46$ 29.00 $ 0.11 65.19$ 100-GF GEN FORMAN MARK R LYONS 54.38 $ 27.98 $ 0.11 8 81.56$ 28.80 $ 0.11 979.99$ - $ - $ - $ - $ - $
Subtotal Labor 3,318.40$
35% Mark Up 1,161.44$
Total Labor 4,479.84$
SUBTOTAL 17,376.27$
-$
17,376.27$
D
ESCRIPTION St art of Shift 6/7/23
REMOVE TRENCH PLATES, FINISH POTHOLE TRENCH ON COURT 15+13 REINSTALL TRENCH PLATES. REMOVE TRENCH PLATES SLURRY BACK TRENCH ON COURT 13+59 AND REINSTALL TRENCH PLATES. SLURRY IS FROM TODAY AND YESTERDAY.
A-C Electric Company
CUSTOMER
REFERENCE
A-C JOB NUMBER
CUSTOMER JOB #
HYDRO EXCAVATING
TOTAL COST THIS REPORT
Invoice Description
TRAFFIC CONTROL
SAND SLURRY
SAND SLURRY
MINI EXCAVATOR W/TRAILER
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 June\CR 63.02 June EWBPrinted 2/7/2025 A-e c� e� -CALIFORN!AC·10LICENSE99849
ENGINE E Rl NG-CO NSTRU CTI ON-TECH NO LOGY-SERVICE
Daily Work Report
DWR#: 142654
Submitted By: ROBERTO ZAVALA on 6/8/2023 9:03:35 PM
Job/Work Order Number
VR0337
Date
2023-06-08
CCO No./Area
Required for M and R jobs
Cr63.01
Site/Location
Court
Division
Visalia
Description of Work
Job Name
DOWNTOWN STREET LIGHTS
Job Home Local
100
P.O.Number
Customer
CITY OF VISALIA
Local Reporting To
100
QuoteorT&M
0 Quote
Work Completed?
0 Yes � No
�T&M
Remove trench plates, finish pot hole trenc h on court 15+13 reinstall trench plates. Remove trench plates Slurry back trench on court 13+59 and reinstall trench plates. Slurry is from today and yesterday. ·-----·---------
End Time Class ST OT DT TT Adders Verd --·-----·----- ------------- ROBERTO ZAVALA 08:00 PM
KEVIN LANDRADE 08:00 PM
MARKRLYONS 08:00PM
Materials
Qty UOM Material
07:00AM
07:00AM
04:30AM
F 0 10
J 0 10
GF 0 8
Vendor/Truck Stock
.5 0 0 0
---------------
.5 0 0 0
0 0 0 0
Packing Slip No. ---- -- --------- ----------
I 19 Yards2sacksandslurry
---- ---
Equipment
A-C Owned/Rental
A-COwned
A-COwned
Hours
10.5 10.5
Vendor 912813, 9127 58
___ A-C_E_q,- #/Rental Agency ____ ---'-M-"iles ___ Equipment Descripti_on MV707 0 Dump truck
MV 653 0 Hwy truck
;--------- , .. - -------·-- ----- ,.. -------------- ---------------- A-COwned 10
A-C Owned
I
""-------·--------------
Rental
8 10.5
Rental 10.5
51547
MV 541
10949061
10595346
0 0
0 0
Light tower
Foreman truck
Trailer
Mini ex
Employees
Technician Dispatch nme ---- --------------- ·---·----- -- 1-------------- --------------- - - ---- - --- ------------- ! --------·7
!
I.
,-------------- - ------------------- ------- ----- --------------, ! ·--------- ----------····--.. - j ;
! i ------------- .. ··-----·"•··-·---- ,
----------- - ----------· --'
Subcontractors
Ticket No.
907010
Approved By
Customer Representative. ..
James Grier
Completed By
Field Representative. ..
Marklyons
Badgers
KRC
Company Subcontract-DirectJob Item
Pothole trench
Traffic control
Customer Signature
�,!,�
µc 4 .{, \ t.
Add Signers
0 Yes
Field Signature
ii-~-===== - ~ --~ [_
-11-e~e~
Please see cost break down on next page
J;
~IG
TRAFFIC CONTROL~ SAFETY SUPPLIES ~ EQUIPMENT RENTAL~ TRAFFIC DESIGN Invoice
§A.FETY co_,, INC .
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fa.-;# 559-732-2684
Bill To
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
P.O. No.
VR0337
Date Item
Terms
Net30
Description
Date
6/16/2023
Job Info:
9-22-0I/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALlA
VR0337
Due Date Ordered By:
7/16/2023
Quantity Rate
06/04/2023 2 man0Ol 2 man lane closures - J -8 hour Sunday shift J 2.215.50 06/04/2023 Overtime Overtime - Per hour (8-12 hours) 6 115.00 06/05/2023 2man 001 2 man lane closures - I -8 hour shift I 1,555.50 06/05/2023 Overtime Overtime - Per hour (8-12 hours) 7 115.00 06/05/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) 1 75.00 06/06/2023 2man 001 2 man lane closures - 1-8 hour shift 1 1.555.50 06/06/2023 Overtime Overtime - Per hour (8-12 hours) 8 115.00 06/06/2023 Arrowboard - A ... I 75.00
Invoice#
59609
Amount
2,215.50
690.00
l.555.50
805.00
75.00 1.55:5.50
920.00
75.00 ~tv Additional arrow board(s) per shift (includes lane) ....... -___....::--; ' ~i
J~
06/07/2023 2 man 001 2 man I ane closures • 1-8 hour shift 06/07/2023 Overtime Overtime - Per hour (8-12 hours)
06/07/2023 Arrowboard • A ... Additional arrow board(s) per shift (includes lane) u6/08/2023 2man 001 2 man lane closures - 1-8 hour shift 06/08/2023 Overtime Overtime - Per hour (8-12 hours)
INDEMNlTY AGREEt4ENT .. Alf ,'tq«-~ <..o-v<11:.-cd by ~I~ Oo< .... rn-ent~hoU be ot the- :;.ore r1~1,c of -the Cu,:;'Co m~,. Cu--;tornc:r ~.zrc: ~~ ~o dcTcnd. tnd,;f"rlJ"'IJfy ~nd hold hormJ c~:;. Kfi:C S.AJ=~TV co ... •t~ offl.c,er.;.,. d)r~CtOr.; .hnd er'l'lt,,lo)le<e~. -f'ron,, .a,-.d t:IJ:..Mn::..t 3MY .:and ~If U!ebl.Ufy c:J,:Wms,Jud!:m~ntt;. .. <O:-:t"<!: .. --,,:r~r-r,,ey 'f'c-=~ .. or dcrnarid~ of ll~z-otioll"I oM::;.Jn::;: fr-om ~h,c;, u:::se, n,..:,tntcnonce .. opcru't.lon,. Or"' po=e-s~on oft.h'III;". ~Qu,p,r"n,c-h(:
lncludln.c b\.,t not llf"ni't:ed t:o .. thQ:;.t: or)~ni:: from the: i::::ic1:tvc nc:;:l1s:~nc:,c of l<RC. SAl'eTY CO,,. I~ offlCcr.$- .. c;Hr~<,:or.= ~nd e:n'llployec=:~~ 'trii;u"I'\ •nJ.....-y t-o or de-~t.h ofm!Q" <:u,;:.r;ome,.. Ct.1$.tOme,-"'~ ~mploy~e~ .. OI" ::sny other pcr~on,. o,•f,.,-om d~~~:;::c to z,ny propcf"lty,. ~..:iove: nnd except there .!:hall b-e:. no obUpuo.r11 o~thc: p.art of the Cu'1.tomelf' ~o drcfend .. .and.w:-mn,fy ~nd hoJd hnrmtc~:: KRC SAFETY co .• It'.!'; offlc.i::~ .. dl.-cct.or-:::,. .t,,nd crnpJoyc c:;,. It the Uc~ll ty.., ct.cl m::;.,. Jud::rn<-n~ .. co;:.~ cttorn<:Y::: fc.e::o;., or den'\iond$ of' litjt:otion othcf'Wt -:c i:1v1ns:: n~c 1:0 cu<:h obl1 t:e,bon .e,n:i:c 'fr"ON\ 1:hl!:l' ~o1c r•u~:::,IIS:el""l«ec Ol!"'wlUt_W rnl~COndvct of KA:C'SA.F' ETV CO.,. it'!i> off.. ccr.:.., d,rcct.or=,.., o.rid .oc1nc,I oycc~. If Cu~tor-ncr rdu~cs to d,rl'cnd,. I ndcn,,n•fy .i::.nd hoJ d horTnleo:;:~ KRC ~ETY -CO .. It.~ ofh cc,-,., du·-ect-or!:l-,. ,a,nd c:rnpl oyc,es .;.r,,d ::::c.i~e<zuc,-.t,Jy:.::, dc~rm•n.o'ti on t:: mi:tde!' th~t l.u:,.~U,;y j;::. no1: <:h . .ic to 't.h~ ~oli: t'lc:S:l•:a:cr"IC.~ Or"'wt.JI-Fuf mJ::conduct ,c;f tcRC SAFETY CO.,. 1,:;:i, offlc.-e..- .. d:ll"'eC."tor~ .. ~nd emoloyce~ .. Cu-:::~rncl"" •~ obh~:tcd 't:O re,mbur:.:~ any .and .::iifl J1!,obl 111:',I". <:I :01~ .. J1..11d:-mcn~ .. co:::t;.. ott:or-ncy,% fee:: .. (H· d~rn:::.nd::. of htJ::.::i1ionlncurrcd by"KRCS:FAETY co ... Jts office~. d1roc:c.tor:;: • ..i::.nd cniD1 eye: 1:-:::: CtJ~torn~r oi::re-c-~ to notify KRC SAP ET"I' co ... 1 rn rr.e:dl~tety 1,-. C~IC' of- .:3ny occl dent .:ind tQ obt::,!un '(he, r.arf,,-¢~. ~ddr¢S:S:.ie~- tel~phonc .r"IUn"lboei"-:: ~nd othel" J:,-ert•n~nt: infon-n&tlon f~or"'l"I ~u ~r"Uc::;, Jnvo,h,cd ;:ar,d bU --,tnc~~c::;.
1 1,555.50 1,555.50
9 115.00 1,035.00
1 75.00 75.00
~
I 1,555.50 1,555.50
6 115.00 690.00
Sales Tax (8.5%) $0.00
Total $ 12,802.50
Payments/Credits $0.00
Balance Due $12,802.50
Contract Hrs CT ROW EW HRS Supervision HRS
2.00 2.00
10.00 10.00
0.50 8.00
10.00 0.50
12.00 29.00 2.00
Hours % worked 29% 71%
6/16/2023 KRC INVOICE 59609
6//7/23 2-man lane closer 1-8 hour shift 1,555.50$ 455.27$ 1,100.23$ Split per % worked 6/7/2023 Overtime (8-12 hours) 1,035.00$ 302.93$ 732.07$ Split per % worked 6/7/2023 Arrow Board 75.00$ 75.00$ Arrow Boards on CT ROW EW only 758.20$ 1,907.30$
CR63.02 Rpt 6, Amount 1,907.30$
A-C ELECTRIC COMPANY
Job Cost History Report From 06/08/23 To 06/08/23
UnPosted? Including Payroll and A/P Invoices in Progress Tran
TypeDate Reference Description Additional Information Hours Job: VR0337 DOWNTOWN STREET LIGHTS
Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR
06/08/23 PR LYONMR MARK R LYONS Check# F43421 2.00
06/08/23 PR LYONMR MARK R LYONS Check# F43421 2.00
06/08/23 PR MARTJ6 JOSE M MARTINEZ Check# F43302
06/08/23 PR ANDRKL KEVIN L ANDRADE Check# F43393
06/08/23 PR ANDRKL KEVIN L ANDRADE Check# F43393
06/08/23 PR LYONMR MARK R LYONS Check# F43421
06/08/23 PR ZAVAR0 ROBERTO ZAVALA Check# F43450
06/08/23 PR ZAVAR0 ROBERTO ZAVALA Check# F43450 0.50
8.00 10.00
10.00 Subtotal for Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR 29.00
10.00 0.50
Subtotal for Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR 14.00 Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR
Subtotal $1416.00
Tax $95.28
Total $1511.28
Taxable
~ (>===
VIKING READY M IX SALES
JUN 1 2 2023
INVOICE
( ~ •• I ... :_o., ATE I .. ::· .. •1Nvo_1c .. :.· .. ·e. No.:.·.:.•.: .... :.I. .P..\A.,.GE ~ ;:.'.CUSTQMER # ,:, :, . . J 1830 S. MILLIKEN AVE., BUILDING G • ONTARIO, CA 91762
(909) 657-4000
00001234 06 /0 7/2023 308938 1
SEND PAYMENTS TO:
DATE
AC ELECTRIC COMPANY
P .O . BOX 81977
BAKERSFIELD, CA 93380
.. JQB NUMBER '-JOB LOCATIQN:..:'AODRESS
VIKING READY MIX CO. , I NC.
C/0 VIKING READY MIX SALES
1582 1 VENTURA BLVD., #475
ENCINO , CA 91 436-4778
PER PRICE
QUANTITY UNIT ... ... O'ESCRIPTION UNIT TAX TOTAL
7322 MAIN & BURKE VISALIA . -····"· " •'• - ~-.. -.
• PO NUM13ER:--VR0337 ··-- --· - - ··--- -·- ···--· -
_06 / 07 116-210258 9.50 CY 5. 37SK lAGG FA 130.220 0.00 1237.09 06/07 116 - 210258 99 .00 MN DELAY MINUTES 1. 500 0.00 148.50 06/07 116-210258 1.00 LD PUBLIC WORKS DELIVERY C 200.000 0.00 200.00 06/07 116-210 258 1. 00 LD ENVIRONMENTAL FEE 40 . 000 0 . 00 40.00 06 /0 7 116-210258 1.00 LD FUEL SURCHARGE 40.000 0.00 40.0 0 06/07 116 - 210258 1.00 LD LOW CARBON FUEL - SURCH 15.000 0.00 ..:fr06/07 116 -210 2 59 9 . 50 CY 2.00SK SAND SLURRY 118 . 000 0.00 1121 . 00 06 /07 116-210259 1. 00 LD PUBLIC WORKS DELIVERY C 200.000 0.00 200.00 06/07 11 6- 210259 1.00 LD ENVI RONMENTAL FEE 40.000 0.00 40 . 00 06 / 07 116-210259 1.00 LD FUEL SURCHARGE 40 .000 0 . 00 40.00 06/07 116-210259 1.00 LD LOW CARBON FUEL - SURCH 15.000 0.00 15.0 JOB TOTAL LINE 3096.59
PRODUCT RECAP
9.50 NS20 2 . 00SK SAND SLURRY
9.50 ND10521 K lAGG FA
99.00 543 DELAY MINUTES
2.00 555 PUBLIC WORKS DELIVERY CHARGE
2.00 530 ENVIRONMENTAL FEE
2.00 520 FUEL SURCHARGE
2.00 525 LOW CARBON FUEL - SURCHA..-q_GE
'ERMS: Net Due on Receipt. Delinquent if not paid in full within 30 days of invoice date. 1elinquent account s are subject so suspension and closure without further notice. In the vent legal action is taken to collect this account, reasonable attorney's fees and costs will e paid by the Customer.
TAXABLE AMOUNT
EXEMPT AMOUNT
SALES TAX
0.00 3096.59
0.00 3096.59
Taxable
Subtotal $1416.00
Tax $95.28
Total $1511.28
----~===
VIKING READY MIX SALES
INVOICE ~UN 15 313
1830 S. MILLIKEN AVE., BUILDING G • ONTARIO, CA 91762
(909) 657-4000
00001234 06/08/2023 309014 1
SEND PAYMENTS TO: AC ELECTRIC COMPANY
P.O. BOX 81977
BAKERSFIELD, CA 93380
VIKING READY MIX CO., INC.
C/O VIKING READY MIX SALES
15821 VENTURA BLVD., #475
ENCINO, CA 91436-4778
7324 CENTER & WEST VISALIA
•• • - - --- PO' NWJ3ER:
06/08 116-210310
06/08 116-210310
06/08 116-210310
06/08 116-210310
06/08 116-210310
06/08 116-210310
,b~6/08 116-210310
~6/08 116-210316
06/08 116-210316
06/08 116-210316
06/08 116-210316
06/08 116-210316
VR0337· - .. --- . -- ----- - ···- -·- ... ---~ --- ---
6.00 CY 5.37SK lAGG FA 130.220
193.00 MN DELAY MINUTES 1. 000
1.00 LD PUBLIC WORKS DELIVERY C 200.000
1.00 LD ENVIRONMENTAL FEE 40.000
1.00 LD FUEL SURCHARGE 40.000
1.00 LD LOW CARBON FUEL - SURCH 15.000
1.00 LD MINIMUM LOAD FEE 20.000
9.50 CY 2.00SK SAND SLURRY 118 . 000
1.00 LD PUBLIC WORKS DELIVERY C 200.000
1.00 LD ENVIRONMENTAL FEE 40.000
1.00 LD FUEL SURCHARGE 40.000
1.00 LD LOW CARBON FUEL - SURCH 15.000
JOB TOTAL LINE
SLURRY I I
PRODUCT RECAP
9.50 NS20 2.00SK SAND
6.00 ND10521 5.37SK lAGG FA
193.00 543 DELAY MINUTES
- · -· · -•-•·
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
781. 3~
193.0(
200.0(
40. 0(
. 40. 0(
15.0(
40. 0(
40. 0(
15. 0(
2705.3~
2.00 555 PUBLIC WORKS DELIVERY CHARGE
2.00 530 ENVIRONMENTAL FEE
2.00 525 LOW CARBON FUEL - SURCHARGE
2.00 520 FUEL SURCHARGE
1.00 MIN MINIMUM LOAD FEE
TAXABLE AMOUNT
EXEMPT AMOUNT
SALES TAX
TERMS: Net Due on Receipt. Delinquent if not paid in full within 30 days of invoice date.
Delinquent accounts are subject so suspension and closure without further notice. In the event legal action is taken to collect this account, reasonable attorney's fees and costs will be paid by the Customer.
0.00 2705.32
0.00 2705.32
1 Day
Total $127.69
OUnited Rentals· JUN 9
flM!, 4 WEEK BILLfNG 0 DKN INVO,CE
3 A-C ELECTRIC VISALIA BRANCH
...t 1035 W MURRAY AVE
u:i VISALIA CA 932.91-4721
~ Office: 661-410-0000 Cell: 559-679-7286
7.1.30611 MB0.528 8100SS21.p01 288171 1·2 O
111Mn111111 Ut rf n,111 rtnll 11111111 l'1UH111I r11rulI lllf M
AC ELECTRIC CO BAKSRSFIE'LD CA
l?O BOX 81977
BAKERSFIELD CA 93380-1977
#
C:Uatcaur i : 156339
lDVOic• Date : 06/01/23
nat• out 1 11/30/22 03:30 PM
Silled ~h : 06/14/23 00: 00
DR Job Loe : 1035 W MURRAY AVE, V
mt Joh i : 430
C:Uatcm.e:r Job ll>;
P .o. I : Vlto337
R•ql,lUted By : JOE MERCADO
Reserved. By I CLIFFGENBSIS SALUDEZ
Sale•person : BRYN HHITE
• --,
rnvofce Amount: $2,553.88 ,.
Te111111: cue UJ)Oll Receipt
Paymeor op!IOIIII: C0nllel 1U avdt ollica '104-916-481'7 REMIT TO: UNITED RENTALS (NORTH AMERICA),IIIIC.
P.0,SOX051'22
LOS ANGELES CA 90074-1122
I Ir
RENTAL ITEMS :
~ Bguipment __ ..:De::::;:s.:::,cri~~~i::::on---------~ Minimu111 Day Week 4 Week Amount _..;.::===-----=~---.:!!!~-__,:!...,!~~- ---=""-=---t .. .._ 1 l094906C TRAILElfTtLT l2'-i6'TO ~1';99ll~ ···
Make: TOW MASTBR Model: T-9D'l' 16'
Serial: 4KNBT232SKL1626l3
1 1059S346 M:WI BXCAVAToR 7400-9199#
Make: TAXEUClU Model: TB240
Serial, 124002620 Meter out: 1435.80 -"leter in: ,00
1 907/0525 MINI BXC~VA1'0R BUCKET 12 ''
SALES/MISCBI.LANBOUS ITtMS:
_ ___,ot~y Item
1 CA FBR~ PROP TAX REIMB Cl{ARGR
COMMBNTS/NOTBS:
CONTACT: JOB MERCADO
CBL~#: 559-556-5783
fDRSORCA/MCIJ
3ll.OO
Price
14.070
Billing period: 28 Days Prom 5/17/23 03:30 PM Thru 6/14/23 03:30 PM 1,034.00 1,876.00 1,876,00
N/C
Rental subtotal: 2,339. ?3
Unit of Measw:e Extended Amt.
EACH
Sales/Misc Subtcul:
Agreement SUbtotal:
T«x:
TOtal,
u.01
~4.07
2,353.80
200.08
2,553.88
Btfectiv• January 1, 202l. end vbar• par'lllitted by law, UU;lted :Rantala ma.y impoaa a •11:~harg• of 1.B\ tor credit card P•~ta on charge accounts. :rhi ■ •urcharo- i■ 1101: great:er t:tlan cur 111111rchimt d,iscOUD1: rate fo:i: er111dit eard tranaact.ious mid i• allbjact to sale■ tait .in •ome juriad.ict:I.Qll•.
IIIOTtCII: Thi• iuvoic■ is allbjaet to th■ tem■ IIZld. conditiou ~ th• Rantal ud Service ••-t, wbich are a·••-Uahl• at ...... -.u- .... o,.,,.,._ul■ . .,om/1 .... 1/rmttal-1e%Vic•-tem11-t1S aid .iiicll ar·e incorporated ha:niu by ~e!ertm(:a. A COPY or '1'!11 aElffAJ, Badger Daylighting Corp
BADGER
DAYLIGHTING"'
'BltLTO
A-C ELECTRIC COMPANY
PO BOX81977
BAKERSFIELD, CA 93380
Customer Number
35951
•· ,ser,vice , Ticket#
0DatE!'
06-07-2023 T
K
T-060423-907008
06-07-2023 TKT-060423-907008
06-07-2023 TKT-060423-907008
06-07-2023 TKT-060423-907008
06-07-2023 TKT-060423-907008
PO/Work Order
VR0337
Unit# .. Item Description
975 Consumable
Matertals
975 Badger Hydrovac
With Operator
Overtime
975 Supply Water
975 Badger Hydrovac
With Operator
Premium
Time
975 Fluctuating Fuel
Recovery
REMIT TO
2530178
06-09-2023
90 Net
"'1lit:';i:i½'liJffls'ir•z'.!!w�
Badger Daylighting Corp
PO Box95000
LB# 1627
Philadelphia, PA 19195-0001
Bank Routing #: 026013673
Account#:03248177952
AFE/Job
VR0337 CR63.01
, .. '' Badger:Sales,.Area i
40004
Qty Unit of .,unit �rice Am'ount ··
. MeaSUr:e.
1 Each 25.00 25.00
12 Hour 350.00 4,200.00
1 Each 80.00 80.00
1 Hour 405.00 405.00
401.29 401.29
!Total Dile!USDl 'cl 5,111.29
Please see attached tickets for additional detail
Badger Daylighting Corp PO Box 95000, LB# 1627, Philadelphia, PA 19195-0001 Phone, (877) 322-3437 Please direct a� invoicing inquiries to [email protected] and remittances to [email protected] ... '
I·"'· ,( :- _.-
;_
L-1: _ ____.l I __ ______.I IL__.· -------·1 L-..-t· _ i . _ rl \ " .. ,:-
• I
' I
' I
I _,
I I
A-C ELECTRIC COMPANY
PO BOX81977
BAKERSFIELD, CA, 93380
Job Name: Downtown Street Light Project- Visalia
Trenching
Site Location: LOCUST ST Visalia, CA, 93277
Requesters Name:
Cost Centre/GL: Major/Minor:
Badger Contact Info: 3054 East Cartwright Avenue
Fresno, CA. 93725
CA License #945499
Ticket Number: TKT-060423-907008
Ticket Date: 06-07-2023
Job Number: SR0000400085
Paper Ticket#:
PO/WO#: VR0337
AFE/JOB#:
Phone: 559 2332208
Job Name: User/Approver ID:
Rig/Well Pad #:
other Order #:
Item
Badger Hydrovac With Operator
Overtime
Badger Hydrovac With Operator
Premium Time
Consumable Materials
Supply Water
Disposition
Fluctuating Fuel Recovery
Notes:
Approved By:
Approver Name:
Approver Phone#:
Item Description
This is not an invoice
Total subject to change based on taxes, fees and other charges.
Unit# Quantity
975 12
975 1
975 1
975 1
975 1
975
Rate
$350.00
$405.00
$25.00
$80.00
$0.00
UOM
HR
HR
EA
EA
EA
Ticket Total:
Amount
$4200.00
$405.00
$25.00
$80.00
$0.00
$401.29
$5111.29
Unless Buyer expressly advises otherwise, Buyer represents and warrants that the soil and groundwater in the area of the Hydrovac excavation operations ls not contaminated with any non-naturally occurring substance, and buyer hereby indemnifles_and holds Badger Daylighting Corp (or LP in Canada's case), and its directors, officers, employees, agents, and contractors harmless from all losses, costs, expenses, and pena!Ues which it or they directly or indirectly suffer or incur in the event the soil and or groundwater is contaminated with any substance other than naturally occutring substances.
BADGER DAYUGlffiNG-
CALTRANS ROW
CITY OF VISALIA DATE: 7/26/2023
VR0337 DWR DATE: 6/9/2023 SOS 6/8/23
AREA DWR NO.: 142657
CONTRACTOR REPORT NO. Rpt 7
CR NO.: 63.02
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV707 DUMP TRUCK 3 YRD TRUON TRUN 2AXL 8 45.02 $ 2 0.81 0.21 433.09$ 2 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 2 0.87 0.15 523.23$ 3 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 2 0.86 0.15 73.97$ 4 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 2 0.87 0.15 243.31$ 5 S1706 SKIDSTEER, BOBCAT, EMSS HCESP BOBCAT CTERRA 1 43.69 $ 0.88 0.13 43.69$ 6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 1,317.29$
15% Markup 197.59$
Total Equipment 1,514.88$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 213602575-007 UNITED RENTALS 6/1/2023 1 $ 127.69 R $127.69 11 2530846 BADGER DAYLIGHTING 6/12/2023 1 $ 4,671.79 S $4,671.79 12 59609 KRC SAFETY 6/16/2023 1 $ 2,245.50 S $2,245.50 13 14
15 Subtotal Material, Subs, and Rentals 7,044.98$
15% Material Markup -$
10% Sub/Specialists Markup 691.73$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 7,755.86$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 10 75.04$ 28.60 $ 0.11 1,150.39$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 10 66.35$ 28.34 $ 0.11 1,051.01$ 100-GF GEN FORMAN MARK R LYONS 54.38 $ 27.98 $ 0.11 10 81.56$ 28.80 $ 0.11 1,224.99$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 3,426.39$
35% Mark Up 1,199.23$
Total Labor 4,625.62$
SUBTOTAL 13,896.37$
-$
13,896.37$ T OTAL COST THIS REPORT
A-
C JOB NUMBER
CUSTOMER JOB #
DESCRIPTION
A-C Electric Company
CUSTOMER
REFERENCE
Start of Shift 6/8/23 Remove Trench plates, pothole trenches. Install conduit, pour slurry and reinstall trench plates at 16+15 and 17+96 Invoice Description
MINI EXCAVATOR W/TRAILER
HYDRO EXCAVATING
TRAFFIC CONTROL
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 June\CR 63.02 June EWBPrinted 2/7/2025 ../1-e EJ./ecbzic, e� - CALIFORNIA C-10 LICENSE 99849
ENGINE ERi NG-CON STR U CTI ON-TECHNOLOGY-SERVI CE
Daily Work Report
DWR#: 142657
Submitted By: ROBERTO ZAVALA on 6/9/2023 6:02:54 AM
Approved by: SCOTT E BLANKENSHIP on 06-09-20234:08:39 PM Job/Work Order Number
VR0337
Date
2023-06-09
CCO No./Area
Required for M and R jobs
CR63.01
Site/Loca tion
Court
Division
Visalia
De scription of Work
Job Name
DOWNTOWN ST REET LIGHTS
Job Home Local
100
P.O.N um ber
Customer
CITY OF VI SALIA
Local Report ing To
100
QuoteorT&M
0 Quote
Work Completed?
0 Yes
ST&M
Remove trench plate, pothole tr enches, install conduit, pour slurry and reinstall trench plates at 16+15 and 17+96 Employees
Technician Dispatch Time End Time Class ST OT DT TT Adders
ROBE RTO ZAVALA
KEVIN LANDRADE
MARKRLYONS
Materials
Qty UOM
19 Equipment
---- _____ ,, __
06:00AM
06:00AM
06:00AM
Material
Yards 2 sack sand slurry
02:30PM
------ - -------- -
02:30PM
02:30PM
F 0
-- -- ---- ---------
0 GF 0
Vendor ff ruck Stock
Ve ndor
A-C Owned/Rental Hou rs A-C Eq. #/Rental Agency Miles
A-COwned
A-COwned
A-COwned
A-COwned
----·-------
Rental
Rental
A-COwned
I
-------------·------------
----
10 - -- -------··-- ---
10 - -----------
10 10
10 10
1 MV 707
MV 653
S1547
MV541
10949061
10595346
S1706
0 0
0 0
0 10 0 0 0
10 0 0 0
10 0 0 0
Packing Sl!P_ No.
912879,912877
Equipmen t Description
Dump truck
Hwy truck
Light tower
Foreman truck
Trailer
Mini ex
Bobcat
Verd -------
0 0
0 0No
0 ~--- ................. _. __ . .,, .. _ ........... . ------------··--·----------- ·----- -~---------·- .... ..,_ - __ .. ~ ... , . i I
I
i
i .. ---- .. -·-·-··---··------- ·-"'"·"·'"'-.. ... --.--.... , ................... --............ -... ------·· ..................... _____ , __ ,. __ .,.,_ __ ~---·--··-- ·-·- - ··-··-··-·-i I·-•-·•--·--•"-~··· . ·····•·•--•··----- ·--· ·---- ·--·--·-·-···- -··--··---·-·-·•···-···-·- · ··-· -·-· I
··-·---···-- ·· ·-----
Subcontractors
Ticket No.
Approved By
Customer Representative. ..
James Grier
Completed By
Reid Representative. ..
Mark Lyons
2 KRC
Badger
Traffic control
Pothole Trench
Customer Signature
Field Signature
Add Signers
0 Yes
IJ-0Ckd,,,i,;&,,�
Llc. 99849
Company Subcontract- Direct Job Item
907010
1 Day
Total $127.69
OUnited Rentals·
auJlcr 641
·•uN g ~ 4 WEEK BILUNG J O D}Q INVOJCE
935 JfO/llm tsBN JW)ZlO,)C ar vza.u.u CA 93292-6620
559•'41-!111;1
~ A-C ELECTRIC VISALIA BRANCH
.t 1035 W MCJRRAY AVE
Ol VISALIA CA 93291-4721
~ Office: 661-410-0000 Cell: 559-679-7286
7.1.30511 MB 0.!28 8106562t.p01 2S!l171 H O
1•d•f u11 •r•dll !lnlf I I 1hrll1111 I rj •r•• Imp• 11ul uj ,llflld AC ELECTRIC CO BAKERSFIELD CA.
PO BOX 81977
BAICBRSPI2LD CA 93380-1977
RENTAL ITEMS:
~ !guipment Description
l l094906C ~LER-TIL'l" i2•-i6•TO 9";99"9l(1'Rm!M •• ·
Make: TOW MAS'I'ER Model: T-9D1' 16 1
Serial: 41CNBT232SKL1626l3
l 1059S346 Mnil'I EXCAVATOR 7400-9199H
Malte: TAKBUCHI Model: TB240
Mint-=
serial, 124002620 Meter out: 1435,80 ~ter in: ,00
l 907/052S MINI EXCAVATOR BUCKET l~P•
SALBS/MISCSLI.ANBOO'S ITEMS:
_ __.O ..... t.,_y Item
1 CA l?BRSONAL PROP TAX RBIMB C1tAR.GB
COMMBNTS/NOTBS:
CON!~, JOB MBRCIIDO
CELL#: 559-556-5783
[DRSURCA/MCI J
# ?13M2575-007
Cuatoma:t- I : 15633 9
IDVOic• Date : 06/01/23
,at• Out I ll/30/22 03~30 PM
Silled ~h : 06/14/23 00:00
OR .Job Loe : 1035 W MURRAY AVE, V
UR Job t : 430
CU•tcmer Job It>;
P .o. I : VR0337
R■quuted By : JOE MERCADO
a•served. By s CL!FFGENESIS SALUDBZ
Sale,ipereon : BR'!ffl WHITE
Invoice Amount: $2,553.88
T 6111111: Olli Upon Receipi
Pa~ 0pllOl'c Cal!lcl DII' aDCttOllic!I 704-lllMS17
REMn' TO: UNITED RENTALS [NORTH AMERlCA),INC.
Day
312.00
Price
14.070
P.O.BOX051122
LOS ANGELES CA 90074•1122
Week 4 Week
1,034.00 l,876.00
Rental Subtotal:
Unit of Measure
EACH
Sales/Miec SUbtctal:
Agreement Subtotal:
Tax:
TOtal:
Amount
1,876.00
N/C:
2,339,73
Extended Amt.
l,4.07
~4.07
2,353.80
200.oa
2,553.88
Billing period: 28 Days From 5/17/23 03:30 PM Tm:u 6/14/23 03:30 PM Bf!-ctiva Ja11uaey 1, .2021 eo:14 wher• penaitt414 hy law, ll'Qited RaDt&lB ID&Y imp(,aa a ~cbarge of 1.8'!1 for credit ear4 P•~ta on c:lllU'Sie «cc:owits. "?bi• JlllJ:C~ i■ 110t 11reat:ar tbazl cur 111arc:hclt: dJ.11eow:u: ;i:-aa,a fc,,: c,:-edit c«rd tranaactic:ma ~ ia aUbjact to aalell tax. in ■ amo jurilld.ietion•-
IIIO'?IClh This hm:>lc• ill 111bjact to th• tenus &14 elm4it1011.11 of t.b• l!eR.t:al aud Service ••-t, which are availmla at ..... ___ , ,_ ""'4 .,.,. .. -t.a1■ .,,t111/l..,.l/rll!ltal·••rvic:•-t•~•VS alM!. Whi~ll 111:"e i=ea:cpoi:ated :tuirdii by :r-efarllilea. A COPr or 'rB!I RDTAL �
PftPGER
Badger Daylighting Corp
DAYLIGHTING"'
,, ;,BIU:L''l;O ' '" "
A-C ELECTRIC COMPANY
PO BOX81977
BAKERSFIELD, CA 93380
/'6usfo111�rlN0111tier
35951
• • PO/Work Order
VR0337
'$eriicEfI' ,.;- Ticket!#, Unit#_ Item Description .;
; -; ""- ,';,
'Da�e· ?,
06-08-2023 TKT-060423-907010 819 Consumable
Materials
06-08-2023 TKT-060423-907010 819 Badger Hydrovac
With Operator
Overtime
06-08-2023 TKT-060423-907010 819 Supply Water
06-08-2023 TKT-060423-907010 819 Fluctuating Fuel
Recovery
REMIT,TO
Badger Daylighting Corp
PO Box95000
LB# 1627
Philadelphia, PA 19195-0001
Bank Routing#: 026013673
Account#:03248177952
•AFE/Job
VR0337 CR63.01
·_. Badger;Sales·Area
<
40004
12 1
1 Unit of
·_Measure
Each
Hour
Each
UnitiPrice > ·"'
;; Amoifof ,
25.00 350.00
80.00 366.79
Total.Due USD ""·
25.00 4,200.00
80.00 366.79
4,671.79
Please see attached tickets for additional detail
Badger Daylighting Corp PO Box 95000, LB# 1627, Philadelphia, PA 19195-0001 Phone: (877) 322-3437 Please direct all in�oicing inquiries to [email protected] and remittances to [email protected] - ;.:, ~t.. ~.~ • , '
• _ ·:•. -~ ,;_; v~·. ·"'- ~ :.,_ t= "·
. ' "·-'· -.. . :
! - •
2530846
06-12-2023
90 Net
·}tf~%t~~~lttl tT!
( l .. ·I
--,., BADGER
DAVUG!-ITING�
A-C ELECTRIC COMPANY
P OBOX81977
BAKERSFIELD, CA, 93380
Job Name: Downtown Street Light Project- Visalia
Trenching
Site Location: LOCUST ST Visalia, CA, 93277
Requesters Name:
Cost Centre/GL: Major/Minor:
Badger Contact Info: 3054 East Cartwright Avenue
Fresno, CA. 93725
Ticket Number:
Ticket Date:
Job Number:
Paper Ticket #:
CA License #945499
TKT-060423-907010
06-08-2023
SR0000400085
PO/WO #: VR0337
AFE/JOB #: VR0337 CR63.01
Phone: 559 2332208
Rig/Well Pad #:
Job Name: User/Approver ID: Other Order #:
Item
Badger Hydrovac With Operator
Overtime
Consumable Materials
Supply Water
Fluctuating Fuel Recovery
Notes:
Approved By:
Approver Name:
Approver Phone #:
Item Description
This is not an invoice
Total subject to change
based on taxes, fees and other charges.
Unit# Quantity Rate UOM Amount
819 12 $350.00 HR $4200.00
819 1 $25.00 EA $25.00
819 1 $80.00 EA $80.00
819 $366.79
Ticket Total: $4671.79
Unless Buyer expressly advises otherwise. Buyer represents and warrants that the soil and groundwater in the area of the Hydrovac excavation operations is not contaminated with any non-naturally occurring substance, and buyer hereby indemnifies and holds Badger Daylighting Corp (or LP in Canada's case), and its directors, officers, employees, agents, and contractors harmless from all losses, costs, expenses, and penalties which It or they directly or indirectly suffer or incur in lhe event the soil and or groundwater is contaminated with any substance other than naturally occurring substances. 'ljf
�,,
,(7
�,q
�14
TRAFFIC CONTROL~ SAFETY SUPPLIES~ EQUIP:MENT RENTAL~ TRAFFIC DESIGN Invoice
SAFETY co_,, INC .
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fa.x# 559-732-2684
Bill To
Date
6/16/2023
Job Info:
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CJTY OF VlSALIA D0WNTO\VN ST LIGHT
VISALIA
VR0337
P.O. No. Terms Due Date Ordered By:
VR0337 Net30 7/16/2023
Date Item Description Quantity Rate
06/04/2023 2 man 001 2 man lane closures - 1-8 hour Sunday shift 06/04/2023 Overtime 0\'ertime - Per hour (8-12 hours)
06/05/2023 2 man 001 2 man lane closures - 1-8 hour shift 06/05/2023 Overtime Overtime - Per hour (8-12 hours)
06/05/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 06/06/2023 2 man 001 2 man lane closures - 1-8 hour shift 06/06/2023 Overtime Overtime - Per hour (8-12 hours)
06/06/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) 06/07/2023 2 man 001 2 man lane closures - 1-8 hour shift 06/07/2023 Overtime Overtime -Per hour (8-12 hours)
06/07/2023 Arro\vboard - A. .. Additional arrow board(s) per shift (includes lane) 06/08/2023 2 man 001 2 man lane closures - 1-8 hour shift 06/08/2023 Overtime Overtime - Per hour (8-12 hours)
-
INDEMNITY AGREEt.tlENT .. Afl ltct't't::. cov-c,·cd try •th;� Docun-.cn't �h.oU be�� the :,.ol� ri�k of 'the CU:.t:omC'•· C\.l'�tonu:r � i::rc ii;,::. t:o dc'icnd ., •ndc:rnnlfy .:,nd hold �rm1c�� K'RC $..A.ff!TV eo ... •'t� off•�-=� .. d,r<-.c,::o� and >111n') ploye��� -fro.no. and � s-�1n�'= �ny 3nd �U U.:etblll 'ty cl�,....� .. J1.1dl:n"u:•n-r:.� ... c:o�-i� .. &l:'to�n r:y �'!:er::. or dc"'ond.::i of lt1;t :;:ot:i on -ori�,n � frorn the- u:s:e., m�lnt"cnonc:,e., op,,:roT.lon,. or POS$e�on ,of 'th--:: <e: qulprncn't 1ncludtn: but not llm!tcd to ... tho�c- or·l�n :::from �he:- ::,ct:lvc noe �l•�oencc of t<R<: SAl't!TY co .. '"� offlcc:r:::: .. di..-ie-ct:o,-:. and em ployee::;;., -from 1 n1ury to Qt"' d<e:i:>� of the CA.a�tom-:r .. C.U-stor.-,er-:=:. ,e m p,Joyee$,. o� ony othcr per-�on .. ¢.,. from d�m;:. ;:c 'to an y j)f"o1:ue� .. �vc �ru:! cxc:-=- pt.th.er� :t.h&JI b,e no ob1J ::;=iit.1on oo the p�rt of �he Cl.l�tomc-r 't'O defend. tnd.c-m1•11 fy t11nd hold hc:armlc� KRC SA.FETV co .• a::: offtc�� .. cll.-:e,:-t,or�. end cmi:,toyc c�. '1 the lfobUi ty,. c:l�tm�. Jud::,n')c-nt�4 c;o:.t� ot1::o.,...,, ey::,, fc:-se:; ., QI" <h:-rnQnd� of U'tJ s:;:.t:ion othc.........-i �e i:,v-1ns::: r't�e :to c.uc:h ob11Ji:tsCSOr"i ,t,'1:,c "lr<:i� �hie ::o1e nc 5:J1g:cr'tC'e Ol'"wtll �ul mi�conduet of t<RC s.AF ETV CO.,. u� officer.;, d,,.cctor:> ., ond -.:mplo yccs. tf C'-1�tomcr rcfy:;;.cs,'to dr:fend, Indemni fy t:rnd hold hon-nie-�::.: KR,C t.APETV CO .. tt:;:. off1c:c.r.;., d�rot:c::"T;o� • .:,n� �rn ploye-c� �r,d �vb-$:�,qu-cnll y .o -det-cr"rninotion •� mt:1d.,. th.:=it JJ.i:,t,tJl"tY •� not due 1:0 the- :::::o-le ne �I• i:cnc-c:: .or vvjlJful mJ�conduct of t<RC SAFETY CO.� it:: c>ffiC:6!r ,. �rec:�ors.. obnd Cl"'l"lPIOYCC$ ,. CY�1:0l"n<C1"' 1$ ObJJ �'tcd 'CO a'"(!Jr'l'llbur"::e any ond Zlll h:!tbllJ t-,,.,. clti,in-P.:.,. Jud�m,:nt;-:;:. ,;o�'t,,. �t1::or-nc)"� f,:a::-4 or de:rn:::iind::;. of hb :.ction )n.cvrrcd by XRC SFAETY CO...,. 1-t.:,, off•c-e�. d•r"crtor:;.. �nd .:moJoy�c� cu�tomc:r ::.:;::re.cs. i:o noti f,y, .i-:,:::r.c SAPE:TV CO,� 1mrtu::dl��e-l y In i:;c:r::.a: of ::i.n y ::i,ccldcn't .:,nd 1:0 obtb1n t.h1= r,�,vi.c-::: . .:,ddrc=-=-�. telephone .nul"l"'lblll:'r'-:: �nd other- c:-e:rtlnent 1nforr.n:etJon frotYt �U Pbl""t:le=:
involved tu'ld ell """tnc::s-�.o.::�.
1 2215.50
6 115.00
I 1,555.50
7 115.00
1 75.00
1 1.555.50
8 115.00
1 75.00
I 1,555.50
9 115.00
1 75.00
I 1,555.50
6 115.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
1nvoice#
59609
Amount
2,215.50
690.00
1,555.50
805.00
75.00 1.555.50
920.00
75.00 1,555.50
1,035.00
75.00 1,555.50
690.00
$0.00
$12,802.50
$0.00
$12,802.50
I I
CALTRANS ROW
CITY OF VISALIA DATE: 7/26/2023
VR0337 DWR DATE: 6/12/2023 SOS 6/11/23
AREA DWR NO.: 142715
CONTRACTOR REPORT NO. Rpt 8
CR NO.: 63.02
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV521 F-250 XL REGULAR CAB, VPUT [TRUCK] T&TT 20-28 8 34.49 $ 2.5 0.87 0.15 350.94$ 2 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 2.5 0.87 0.15 546.60$ 3 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 2 0.86 0.15 73.97$ 4 MV541 F-150 XLT SPR CAB, VPUT [TRUCK] T&TT 6-12 8 24.98 $ 0.87 0.15 199.84$ 5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 1,171.35$
15% Markup 175.70$
Total Equipment 1,347.05$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 213602575-007 UNITED RENTALS 6/1/2023 1 $ 127.69 R $127.69 11 309257 VIKING READY MIX SALES 6/12/2023 19 $ 174.87 M $3,322.53 12 2532090 BADGER DAYLIGHTING 6/14/2023 1 $ 5,168.27 S $5,168.27 13 59684 KRC 6/23/2023 1 $ 3,210.50 S $3,210.50
14 15
Subtotal Material, Subs, and Rentals 11,828.99$
15% Material Markup 498.38$
10% Sub/Specialists Markup 837.88$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 13,184.40$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 10 75.04$ 28.60 $ 0.11 1,150.39$ 100-FMNXFOREMAN ROBERTO ZAVALA - $ - $ 0.5 100.05$ 29.35 $ 0.11 71.82$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 10 66.35$ 28.34 $ 0.11 1,051.01$ 100-JWX JOURNEYMAN KEVIN L ANDRADE - $ - $ 0.5 88.46$ 29.00 $ 0.11 65.19$ 100-GF GEN FORMAN MARK R LYONS 54.38 $ 27.98 $ 0.11 8 81.56$ 28.80 $ 0.11 979.99$ - $ - $ - $ - $ - $
Subtotal Labor 3,318.40$
35% Mark Up 1,161.44$
Total Labor 4,479.84$
SUBTOTAL 19,011.28$
-$
19,011.28$
D
ESCRIPTION
A-C Electric Company
CUSTOMER
REFERENCE
A-C JOB NUMBER
CUSTOMER JOB #
Start of Shift 6/11/23
Remove trenchplates, finish pothole trench on court 18+ 69 reinstall trench plates. Remove trech plates , start pot hole trench on court 22+69 reinstall trench plates.
Remove trench plates finish slurry on court 13+59, 15+13, 16+15. Start and finish slurry on court 18+69. Start slurry in trench at court 17+08 and reinstall trench plates. slurry is from today.
TOTAL COST THIS REPORT
Invoice Description
MINI EXCAVATOR W/TRAILER
SAND SLURRY
HYDRO EXCAVATING
TRAFFIC CONTROL
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 June\CR 63.02 June EWBPrinted 2/7/2025 4-e lJ,� e� -CAL!FORN!AC-10LICENSE99849
ENGINEERING-CON ST RUCTION-TECH NO LOGY-SERVI CE
Daily Work Report
DWR#: 142715
Submitted By: ROBERTO ZAVALA on 6/12/2023 9:47:03 PM
Job/Work Order Number
VR 0337
Date
2023-06-12
CCO No./Area
Re,iuired for Mand Rjobs
Cr63.01
Site/Location
Court
Division
Visalia
Description of Work
Job Name
DOWNTOWN STREET LIGHTS
Job Home Local
100
P.O.Number
Customer
CITY OF VISALIA
Local Reporting To
100
QuoteorT&M
0 Quote
Work Completed?
0 Yes $ No
$T&M
Re move trench plates, finish po t ho le trench on court 18+69 reinstall trench plates. Remove trench plates, start pot hole trench on court 22+69 reinstall trench plates. Remov e trench plat es finish slurry on court 13+59, 15+13, 16+15. Start and finish slurry on court 18+69. Start slurry in trench at court 17+08 and reinstall trench plates. Slurry is from today.
Employees
Technician Dispatch Time
i ROBERTOZAVALA 08:00 PM
KEVIN LANDRADE 08:00PM
MARKRLYONS 08:00PM
Materials
Material
19 Ya rds 2 sack sand slurry
Equipment
.----------- ----
EndTime Class
07:00AM F
ST OT
0 10
--- - -- --- ----------- --- -
DT TT Adders
.5 0 0
. - " ·--------------------
07:00AM J 0 10 ... ., ____________
04:30AM GF 0 8
Vendor/Truck Stock
Vendor
.5
0 0
0 0
---- ---· -----
0 Packing Slip No.
912936, 912932
A-C Owned/Rental Hours A·C Eq. #/Rental Agency Miles Equipment Description ! A-COwned
A-C Owned
A-COwned
A-COwned i------------�----
Rental
Rental
10.5 10.5
10 8
MV 521
MV653
S1 547
MV541
10.5 10949061
10.5 10595346
0 Traffic truck
0 0
0 0
0 Hwy truck
Light tower
Foreman truck
Trailer
Mini ex
Verd
0 0
0 Qty UOM
r-, 1----------- ,-----------·-·---····-·-- -----·--·-· Subcontractors =====-----------
Ticket No.
Approved By
-- - -------
Customer Representative. ..
James Grier
Completed By
Field Representative ...
Roberto Zavala
Badgers
KRC
Company Subcontract- DirectJob Item
Pothole trench
Traffic control
Customer Signature
Add Signers
0 Yes
.. -·-----
-. ---- -·-··---·. ·----·· ···-·-·· __________ ., _____ i f--------- · ·· -- • ··-------·----- --- ! , .. _,._~
1 Day
Total 127.69
OUnited Rentals·
,8 A- C ELECTRIC VISALIA BRANCH
-ri 1035 W MURRAY AVE
Dl VISALIA CA 93291-4721
~ Office: 661-410-0000 Cell: 559-679-7286
·•uN g ~ 4 WEEK BILLING
J O DKN INVOICE 11
# 213602575-007
CUlltame~ t : 15633 9
ra.voic• Dat• : 06/01/23
Elate out: ; ll/30/22 03:30 PM
S-illad ~h : 06/14/23 00 :00
UR Job Loa : 1035 ii' MURRAY AVE, V
UR Job I : 430
CW.tcme:r Job Il):
P .o. I ~ Vli0337
R•queat:•d By : JOE Mll:RCADO
R•ae:rved By ; CLIFFGENESIS SALUDEZ
Sale•pereon : BRm HHITE
7.1.30511 t.!130.!!28 81065521.pO! 28a171 1·2 O
11d•ln1• 'PIHi rJnJl1n111ll 11n 11l1 ,,. Jiil 1 ,muf uf ,11111, 1
AC ELECTRIC CO BAKERSFIELD CA
Invoice Amount: $2,553.88 ---,
PO BOX 81977
BAKERSFIELD CA 93380-1977
REN'i'AL ITBMS,
~ Jquipment Descript.ion
l. io949661·· TRAILER- r:tLT 12' -i6 • TO 9·;99-n~ • • - Make: TOW MASTER Model: T•9D'l' 16'
Serial: 4KNBT2325KL1$2613
1 10S95346 M:ENI BXCAVA'l'OR 7400-9199#
Make: TAXBUCHI Model: TB240
Minillllllll
Serial: 124002620 Meter out: 1435,60 Meter in: .oo
l 907/052S Mnr.t EXCAVATOR BUCKET 12"
Terma: Cue Upc,, R8Qllipc
~c,pll0r9: C0nlad IVOWlofficll 704-ltt~
REl\flT TO; UNITED RENTAi.$ (NORTH AMEA!CA),INC.
P.O. BOX 05HZ!
LOS ANGELES CA 1!0074-1122
Day Week 4 Week Amount
312.00 1,034.00 1,876.00 l,876.00
N/C
Rental subtotal: 2,339.?3 SALES/MISCELuANBOO'S ITlIMS:
_ ___,Qt'-'-'-y Item Priee l.111it. of Measure Extended .Amt. l CA PBRSON.\L PROP TAX RElMB Cl!ARGB
~S/NOTBS:
CONTACT: JOI MBRCADO
CBL!.#, 559-S56-5783
!DRStJRCA/MCIJ
Billing period, 26 Day& From S/17/23 03:30 PM Thru 6/14/23 03:30 PM
14.070 BACH
Sales/Mise Subtotal:
Agreeinent S'llbtct&l :
Tax:
TOtal:
i4.07
}4.07
2,353.80
21>0.oa
2,553.88
lllf!ectiv• January 1, .ion and 1rba:• pu'lllittad by law, IIUited R1112itals may impoH a •~rc)large ot 1,8\ t,;,r crad.it card pll)'Ullta cc ellal'lae •cccuntB. This au>:c~ ia ,:,at 11rutar tllan our JDarchent: discount rate r:or cr•d.it cud transactio11s «ii4 is sll21~•ct to salea ta:x in •e&e ,urudi~ti=•·
1110TICB1 'l'his invoic: ■ is sllbject to ti.■ terms and ci:mdit:I.~ of tti• llenta1 and service ..,_t, vtdch are avaHabl• at "'••-· n- ""°'•,. .. -t...1._.,,,,.,1-1/roan~:L-1•~-=•-t•J:111111•VS 1me1 Qicll an iccorporated her111iit by rel!ei:eaee. A C0Pr or TD amrtAL Subtotal $2832.00
Tax $190.52
Total $3022.52
Taxable
JUN 19 2023 INVOICE
VIKING READY MIX SALES
( CUSTOMER # I . DATE , •• INVOICE NO. • 1 ···· PAGE j
1830 S. MILLIKEN AVE., BUILDING G • ONTARIO, CA 91762
(909) 657-4000
00001234 06/12/2023 309257 l
AC ELECTRIC COMPANY
P.O. BOX 81977
BAKERSFIELD, CA 93380
SEND PAY MENTS TO:
VIKING READY MIX CO., INC.
C/O VIKING READY MIX SALES
15821 VENTURA BLVD., #475
ENCINO, CA 91436-4778
" (DATE j ' :.. . •.•
• • .1 TICKET NO. I
.... JOB NUMBER'- JOB LOCATION -ADDRESS • .. ··
QUANTITY .... i I UNIT I .· .. · DESCRIPTION
J
l
PRICE . I PER.I
UNrrl TAX l
06/12
06/12
06/12
06/12
06/12
06/12
06/12
06/12
06/12
06/12
06/12
7329 S COURT ST & W ACEQUIA AVE
PO NUMBER: VR0337
VISALIA
116-210438 9.50 CY 2.00SK SAND SLURRY 118.000 0.00
116-210438
116-210438
116-210438
116-210438
116-210442
116-210442
116-210442
116-210442
116-210442
116-210442
1.00 LD PUBLIC WORKS DELIVERY C
1.00 LD ENVIRONMENTAL FEE
1.00 LD FUEL SURCHARGE
1.00 LD LOW CARBON FUEL - SURCH
9.50 CY 2.00SK SAND SLURRY
37.00 MN DELAY MINUTES
1.00 LD PUBLIC WORKS DELIVERY C
1.00 LD ENVIRONMENTAL FEE
1.00 LD FUEL SURCHARGE
1.00 LD LOW CARBON FUEL - SURCH
JOB TOTAL LINE
200.000 0.00
40.000 0.00
40.000 0.00
15 . 000 0.00
118.000 0.00
1.500 0.00
200.000 0.00
40.000 0.00
40.000 0.00
15.000 0 . 00
PRODUCT RECAP
I 2.00SK SAND SLURRY I 19.00 NS20
37.00 543 DELAY MINUTES
2.00 555 PUBLIC WORKS DELIVERY CHARGE
2.00 530 ENVIRONMENTAL FEE
2.00 525 LOW CARBON FUEL - SURCHARGE
2.00 520 FUEL SURCHARGE
TOTAL
1121. oc
200.00
40.00 40.00
15.00 1121.00
0.00 200.00
40.00 40.00
15.00 2832.00
TAXABLE AMOUNT
EXEMPT AMOUNT
SALES TAX
0.00 2832.00
0.00 TERMS: Net Due on Receipt. Delinquent if not paid in full within 30 days of invoice date .
Delinquent accounts are subject so suspension and closure without further notice. In the event legal action is taken to collect this account, reasonable attorney's fees and costs will be paid by the Customer.
BADGER
DAYLIGHTING�
A-C ELECTRIC COMPANY
PO BOX 81977
BAKERSFIELD, CA, 93380
Job Name: Downtown Street Light Project- Visalia
Trenching
Site Location: LOCUST ST Visalia, CA, 93277
Requesters Name:
Cost Centre/GL: Major/Minor:
Badger Contact Info: 3054 East Cartwright Avenue
Fresno, CA. 93725
CA License #945499
Ticket Number: TKT-061323-915820
Ticket Date: 06-11-2023
Job Number: SR0000400085
Paper Ticket #:
PO/WO #: VR0337
AFE/JOB #: VR0337 CR63.01
Phone: 559 2332208
Rig/Well Pad #:
Job Name: User/Approver ID: Other Order#:
Item
Badger Hydrovac With Operator
Premium Time
Consumable Materials
Supply Water
Fluctuating Fuel Recovery
Notes:
Approved By:
Approver Name:
Approver Phone #:
Item Description
This is not an invoice
Total subject to change based on taxes, fees and other charges.
Unit#
975
975
975
975
Quantity
11.5 1
Rate
$405.00
$25.00
$80.00
UOM
HR
EA
EA
Ticket Total:
Amount
$4657.50
$25.00
$80.00
$405.77
$5168.27
Unless Buyer expressly advises otherwise, Buyer represents and warrants that the soil and groundwater in the area of the Hydrovac excavation operations is not contaminated with any non-naturally occurring substance, and buyer hereby indemnifies and holds Badger Daylighting Corp (or LP in Canada's case), and its directors, officers, employees, agents, and contractors harmless from all losses, costs, expenses, and penalties which it or they directly or indirectJy suffer or incur in the event the soil and or groundwater is contaminated with any substance other than naturally occurring substances. '',?i(/f;::,
'}}@;:;-,
.,:~~-/1-~;i;::·.:
TRAFFIC CONTROL~ SAFETY SUPPLIES ~ EQillPMENT RENTAL~ TRAFFIC DESIGN Invoice
!sAFETY CD-.,. INC .
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fax# 559-732-2684
BillTo
Date
6/23/2023
Job Info:
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALIA
VR0337
P.O.No. Terms Due Date
VR0337 Net30 7/23/2023
Date Item Description Quantity
)6/11/2023 2 man 001 2 man lane closures - 1-8 hour Sunday shift �6/11/2023 Overtime Overtime - Per hour (8-12 hours)
�6/11/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) 06/12/2023 2 roan 001 2 man lane closures - 1-8 hour shift 06/12/2023 Overtime Overtime - Per hour (8-12 hours)
06/12/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 06/13/2023 2 man 001 2 man lane closures - 1-8 hour shift 06/13/2023 Overtime Overtime - Per hour (8-12 hours)
06/14/2023 2 roan 001 2 man lane closures - 1-8 hour shift 06/14/2023 Overtime Overtime - Per hour (8-12 hours)
06/15/2023 2man001 2 man lane closures - 1-8 hour shift 06/15/2023 Overtime Overtime - Per hour (8-12 hours)
INDEMNITY AGREEMENT. All item"' covered by d,lo; Document,,ho,11 be "'tffie ,oole rt<ak of the Cu:�t:o�oer� C1.,1-::;t:om,...-�:s:r"ee'$� de-fend ,.. JndlC!'r'nnify �nd hold �ll""mllf!-�t: KRC SAFETY co .... it.:::: offacerS ., djreet:ors. and .employ,eoe:� .. ,f,-or'n �n-d .?!IS:�•n� :any :end -llll li.z.bllity, cl-&1nu::.,. J11,.1d&mcn-cs,. cost:!..,. �ttorney f�e!:, or d,:m-ond� of Uti:-otlon :ori�n:;-frorn 'Che u:sc, m.:olntlftn.:ranc:e� os:,cr-01:ion.,. or po,S.!,.-c:,�on of the cqufprnent lndudlni: bvt: not hrniitcd to .,. 'tho�e �,.1:;,tn;e::from t:hc active nczlls:cncc of Kf'.i:C SAFETV co .... tt::: offJccr:;;;, dtr�c;to� 21nd employee� ... frQrn lnJU'l"Y' t:o Of"' d-e�t:h of'the Ct.l�t:omcf"' .. Cu$tOrner"s employees.,. Of"' �ny other pe:�on,. orfrof'n d�ma:g:e "to &ny property ., s::ove .and e:xcept"th,eYe s.h:el! be no obl•�on on the p�rt: o"f the Costome:r to d�f�nd .. indf!n)t"lify �nd hold h:;-trrnle�:;: K:RC:S.AFETY CO ... •w officer-::-.,. d,rcctors,. l:3:nd e:rnplqyccs., l'f 'the flob.U� .. clolrn::;;. .,.Judt:rncnt:�, co::;;t::::: ,:ot;t;orney� 'fc:c:'3 .,. or dcn-a:ond,;;. of li�l�tlon othc�se glvilng: 11:::c to :,;1,.u;h oblji:;a�on :eiri�c frorn the sole nc:g.llg:,ence orwi.tlfW rt,1£conduct of KRC SAFETY CO ....
Its officer.: ,. di�cto� .. �nd crnplQYec::;.� Jf CU-:ttorncr refuse$ to defend, ind�rnnify :and hofd h�,,,-,,Jcs.� KAC SAFETY CO .... Jts officer:.= ,.. d•rcc:;t;:1;;;1r-;i,.. .:::snd employee::.: �nd ::i:t..1�equcnt:ly :e. dctcrmln:.,tlon is "M�dc th::a't U:e.bUl'J;y i::; not: dc,.Je 1:0 the :::ole ne�Hs,:enc;-e or"'w!llful r"nl�onduc;t of= KRC SAFeTY CO.,.. U:s off•cer.,. d•rec;:t;or� .. :tiind employ,ecs: ,. C-.,,:t;orn,.e::r I!; obJis:;atcd �o r"'e-imb1..1-rs:e any -and zdl U�b•llt-v ., d:airn�,. Judi:rt111e:-nf!t..,. co� ... �ttcmcry::; fee::;,., or dcm.ands o-f litii:�"Uon incurred by K�C $FAETV CO ..., Its; offlc:c� ,. di recto� .. and C!mployec!;. CUs'tor"t'ler' =::az.r-ee:;. to notify t<RC SAFETY CO .... ,mmcdl::ately in �e of .e:ny �cddent -ond t;Q obt:�•n t:he: l"'J::arnes ,. :eiddrie-s�es.., t«,l�i::ahone nun-aber� =!and o�er" p-ert�r"lent Jnform.t'!itlon frol"t'J �II p�rt)e� I nvolve:d .and �I Yu1,tr•u1!:!ti-Ce-lS:.
Ordered By:
Rate
I 2,215.50
8 115.00
l 75.00
1 1,555.50
7 115.00
1 75.00
1 1,555.50
3 115.00
1 1,555.50
4 115.00
1 1,555.50
3 115.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59684
Amount
2,215.50
920.00
75.00 1,555.50
805.00
75.00 1,555.50
345.00
1,555.50
460.00
1,555.50
345.00
$0.00
$11,462.50
S0.00
$11,462.50
I
I
CALTRANS ROW
CITY OF VISALIA DATE: 7/26/2023
VR0337 DWR DATE: 6/13/2023 SOS 6/12/23
AREA DWR NO.: 142737
CONTRACTOR REPORT NO. Rpt 9
CR NO.: 63.02
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV521 F-250 XL REGULAR CAB, VPUT [TRUCK] T&TT 20-28 8 34.49 $ 2 0.87 0.15 335.93$ 2 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 2 0.87 0.15 523.23$ 3 S1547 LIGHT TOWER, 6K, TRAB ELGEN LITE 4 LIGHT 8 7.61 $ 2 0.86 0.15 73.97$ 4 - $ -$
5 - $ -$
6 - $ -$
7 - $ -$
8 - $ -$
Sub Total Equipment 933.13$
15% Markup 139.97$
Total Equipment 1,073.10$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 2532090 BADGER DAYLIGHTING 6/14/2023 1 $ 4,291.97 S $4,291.97 11 59684 KRC SAFETY 6/23/2023 TRAFFIC CONTROL 1 $ 1,019.20 S $1,019.20 12 213602575-007 UNITED RENTALS 6/1/2023 MINI EXCAVATOR RENTAL W/TRAILER 1 $ 127.69 R $127.69 13 S5354161.005 ALAMEDA 7/21/2022 3" PVC CONDUIT 440 $ 4.64 M $2,041.98 14 309337 VIKING READY MIX SALES 6/13/2023 SAND SLURRY 9.5 $ 174.87 M $1,661.27 15 S5354161.007 ALAMEDA 8/16/2022 1.5" PVC ELBOW 8 $ 4.46 M $35.68 16 S5354161.007 ALAMEDA 8/16/2022 3" 45 ELBOW 2 $ 10.85 M $21.70 17 S5354161.007 ALAMEDA 8/16/2022 3" 90 SCH ELBOW 6 $ 12.38 M $74.28 18 Sub/Specialists Markup
Subtotal Material, Subs, and Rentals 9,273.77$
15% Material Markup 575.24$
10% Specialists Markup 531.12$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 10,399.27$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 10 75.04$ 28.60 $ 0.11 1,150.39$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 10 66.35$ 28.34 $ 0.11 1,051.01$ - $ - $ - $ - $ -$
- $ - $ - $ - $ -$
- $ - $ - $ - $ -$
- $ - $ - $ - $ -$
Subtotal Labor 2,201.40$
35% Mark Up 770.49$
2,971.88$
SUBTOTAL 14,444.26$
Subcontractor Markup -$
14,444.26$ T OTAL COST THIS REPORT
A-
C JOB NUMBER
CUSTOMER JOB #
DESCRIPTION
A-C Electric Company
CUSTOMER
REFERENCE
Start of Shift 6/12/23 Remove trench plates, finish potholing trench on court 22+69, reinstall trench plates, pothole trench on court 25+00 and reinstall trench plates. Remove trench plates and install slurry on court 22+69 to 25+00.
Invoice Description
HYDRO EXCAVATING
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 June\CR 63.02 June EWBPrinted 2/7/2025 I
'\:, r t:o ... ·1-t
,,(J_e lJ� e� -CALIFORNIAC-10LlCENSE99849
,1;,s· ,,,.-,.° EN GIN EERl NG-CO NSTRU CTIO N-TECH NO LOGY-5 ERVIC E Daily Work Report
DWR #: 142737
Submitted By: ROBERTO ZAVALA on 6/14/2023 1:20:12 AM
Job/W"ork Order Number
VR 0337
Date
2023-06-13
CCO No./Area
Required for Mand R jobs
Cr63.01
Site/Location
Court
Division
Visalia
Description of Work
Job Name
DOWNTOWN STREET LIGHTS
Job Home Local
100
P.O.Number
Customer
CITY OF VISALIA
Local Reporting To
100
QuoteorT&M
0 Quote
Work Completed?
0 Yes
0T&M
Remove trench plates, finish pot hole trench on court 22+69 reinstall trench plates. Remove trench plates, start and finish pot hole trench on court 25+00 reinstall trench plates. Remove trench plates start slurry on court 22+69,25+00.Slurry is from today. Material is all from Court crossings.
Employees
Technician Dispatch Time
ROBERTO ZAVALA
KEVIN LANDRADE
08:00PM
08:00PM
Materials
Qty
9.5 22
8 2
6 I
UOM Material
Yards 2 sack sand slurry
20' sticks of pvc sch40
1.5" 45 degree pvc sch40 elbow
3" 45 degree pvc sch40 elbow
3' 90 degree pvc sch40 elbow
EndTime
07:00AM
07:00AM
Oass ST OT
F 0 10
DT TT Adders
0 0 0
Verd
0 ······--- -- - - -· - -··--·-- -
Vendor
Vendor
Vendor
Vendor
Vendor
0 10 0 0 0 0
Packing Slip No.
913014
Equipment
i A-C Owned/Rental
I A-COwned
L -----�-,.----
A-COwned
Rental
Rental
Subcontractors
Ticket No.
Approved By
Customer Representative ...
James Grier
Completed By
Field Representative. ..
Roberto Zavala
2 Hours
10 A-C Eq. #/Rental Agency
10 10
10 10
MV521
MV653
S1547
10949061
10595346
___ Company
Badgers
KRC
Pothole trench
Traffic control
___ .cM.ci.cles"-------- Equipment Description
0 0
0 0
0 Traffic truck
Hwy truck
Light tower
Trailer
Mini ex
Subcontract- Direct Job Item
Add Signers
Yes
11-6-�
Llc. 99849
I
--------- ·---------
0 UIDGER
OAYUGHTINCi"'
A-C ELECTRIC COMPANY
PO BOX 81977
BAKERSFIELD, CA, 93380
Job Name: Downtown Street Light Project- Visalia
Trenching
Site Location: LOCUST ST Visalia, CA, 93277
Requesters Name:
Cost Centre/GL: Major/Minor:
Badger Contact Info: 3054 East Cartwright Avenue
Fresno, CA. 93725
CA License #945499
Ticket Number: TKT-061323-915821
Ticket Date: 06-12-2023
Job Number: SR0000400085
Paper Ticket #:
PO/WO #: VR0337
AFE/JOB #: VR0337 CR63.01
Phone: 559 2332208
Rig/Well Pad #:
Job Name: User/Approver ID: Other Order#:
Item
Badger Hydrovac With Operator
Overtime
Consumable Materials
Supply Water
Fluctuating Fuel Recovery
Notes:
Approved By:
Approver Name:
Approver Phone #:
Item Description
This is not an invoice
TOtal subject to change based on taxes, fees and other charges.
Unit# Quantity Rate UOM Amount
975 11 $350.00 HR $3850.00
975 1 $25.00 EA $25.00
975 $80.00 EA $80.00
975 $336.97
Ticket Total: $4291.97
Unless Buyer expressly advises otl7eiwisa, Buyer represents and warrants tl7at tl7e soil and groundwater in the area of tl7e Hydrovac excavation operations is not contaminated with any non-naturally occurring substance, and buyer hereby indemnifies and holds Badger Daylighting Corp (or LP in Canada's case), and its directors, officers, employees, agents, and contractors harmless from all losses, costs, expenses, and penalties which ii or they directly or indirectly suffer or incur in tl7e event the soil and or groundwater is contaminated wH:h any substance otl7er tl7an naturally occurring substances. .~i:~~=~-: /~!~t~:(,.'
::;~i:r;;r_;J~/tt~-
•·· •·:: ... ;.:···
1 Please see cost break down on next page
.!
TRAFFIC CONTROL~ SAFETY SUPPLIES~ EQUIPMENT RENTAL~ TRAFFIC DESIGN Invoice
SAFETY CD-, INC.
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fax# 559-732-2684
Bill To
Date
6/23/2023
Job Info:
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALIA
VR0337
P.O.No. Terms Due Date Ordered By:
VR0337 Net30 7/23/2023
Date Item Description Quantity Rate
06/11/2023 2 man 001 2 man lane closures - 1-8 hour Sunday shift 1 2,215.50 06/11/2023 Overtime Overtime - Per hour (8-12 hours) 8 115.00 jj!,-1 1 ~') ~ Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) 1 75.00 06/12/2023 2 man 001 2 man lane closures - 1-8 hour shift 1 1,555.50 06/12/2023 Overtime Overtime - Per hour (8-12 hours) 7 115.00 06/12/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) I 75.00 1------
51 06/13/2023 2 man 001 2 man lane closures - 1-8 hour shift I 1,555.50 06/13/2023 Overtime Qvertime - Per hour (8-12 hours) -3' 115.00 c:J. 06/14/2023 2man001 2 man lane closures - 1-8 hour shift 1 1,555.50 '06/14/2023 Overtime Overtime - Per hour (8-12 hours) 4 115.00 06/15/2023 2 man 001 2 man lane closures - 1-8 hour shift 1 1,555.50 06/15/2023 Overtime Overtime - Per hour (8-12 hours) 3 115.00 , _.
INDEMNITY AGREEMENT .. AU Item:. covered by thl~ 0oc"6mc:n1: ::-hell be &t:th~ ::tole n:;k of Sales Tax (8.5%) ~hie C.:..:-1:omer-~ CU~tome-r ~s:rees. to d.efcnd,. indemnify and hold h~rr"nlc~::.: KRC SAFETY co ... 11;,s: offtcc~ .. di r~ct;o~ ~nd empt oyccs-,. 1'rom and ~S::!,I~ any and ~I Uabl 111:y cl~ms .. J ud~r'nllt"n1:::;,.. <:o::=t:s., ~tt:orney "fees .. or dct'n:.:,nds: of liti1:ati on ;o-11~ ni:: fr-om the U:Jc., maJ ntcn.cancc,. oper.oti on,.. or po.:sscs:si on of- the cQ:ulpmcnt lnch,..adins but: not lirnlt:ed t::o., tho-:s:e ~rl~n$:: from the ~ctlvc nc:zHs:cnc:c of t<:RC .sAFE'TY CO~,. •t, offt.:;c~.
Total
director.:: and crnoroycc-:.:., 'fr-on'I Injury to or deeth oft:he: Cu~tomer., Cu~torn,er'~ ,el"'nploye:ee .. Or" ~ny other per"::on .. orfrort'II dam:a~c t"o any pr-oper-ty.,. s~c and 1!!Xc:,ep1;0"'!crc ::;hnlt be no obl•s:at1on on the part of the: Cus:t:orncrt:o dc:fcnd .. &ndcn"lnlfy :.,nd hold h.Drrnle::;~ KRCSAFETY CO.,.. It. office~ ... dh·ector$ .. ;and .t:molcyec~ .. •'f1:hc flobitify,.. clo.in-.~ .. Jud:!:l"l"lllltt"rt:$ .. <:o,t:s ottorn,ey~ fees,.. or d--t,....ond~ of 111:::tsat::•on othc~,c tivi ns: r1 s.e to ~uch ob11~tion art~,e- fr--om the :t.ole nes:t•1::ence- orwllJful mJ::;c:onduc:t o"f l<RC SAFETY -CO . ., Payments/Credits its offlc:er:.:., d~re:ct:ors,. ~nd crnplo-ycc::=. lfCu:rtorncr rcfu:Sc:s: to defend.,. indcrnnl~ ~nd hold harrnlc-:.:~ KRC SAFE TV CO., I~~ officer:.-,.. dlrertor-$-.,. ~nd cmplQYce:,: ~nd :Su.b:;.c-qu-=:ntly ~ dctef""min..::.t.:lon IS- rn~dc: thot UablHt;y i~ not due to the sole nez,Jls:enc,,e orwt Ufvl ml::;condul'!t of KRC ~ETV co .... •~~ officer ... ch rector~ ... .and employ~-.e,c., CUi::t:orn_.,.. J$ obHi:ated-to relmbu.rc~ -l!!lir.y ~nd alJ li..abillty .. da!nY-:.,.Jud~m,onU., c:o~t ..
Balance Due ~ttomcy=,: +cc~ .. or d~m;,ind::; of llti1:;ot::iion Incurred' by KRC SFAE'YY CO . .,. i:t.:J offi c;er:;.:., dfrcctor.; .. ;ond emD1oYcc-:.:.. Cu:$-'tomc:::r :Z!,£rCC~ 'to notl'fy i<RC SAFETY co .... jmrncdt~tcty ln c:.:a::;;c of any z:i.ccld-:nt i:,,nd 1;0 obt~in the n-&mc$.., add,.esses., ~lephon,,e n.vrnbers:: --,nd other pertinent lnfo..-rnation fYOl"l'l ~,r portle::.
Invoice#
59684
Amount
2,215.50
920.00
75.00 ~ 1,555.50
805.00
75.00 /
1o)u1. , ':5-0-
~
J-,o
1,555.50
460.00
1,555.50
345.00
:
,
1 I
Voo
$11, 62.50
I
I $0.00
' I
{I I, 62.50
/ l
Contract Hrs CT ROW EW HRS Supervision HRS
10.00 10.00
10.00 2.00
10.00 10.00
30.00 20.00 2.00
Hours % worked 60% 40%
6/23/2023 KRC INVOICE 59684
6/12/2023 2-man lane closer 1-8 hour shift 1,555.50$ 933.30$ 622.20$ Split per % worked 6/12/2023 Overtime (8-12 hours) 805.00$ 483.00$ 322.00$ Split per % worked 6/12/2023 Arrow Board 75.00$ 75.00$ Arrow Boards on CT ROW EW only 1,416.30$ 1,019.20$
CR63.02 Rpt 9, Amount 1,019.20$
A-C ELECTRIC COMPANY
Job Cost History Report From 06/13/23 To 06/13/23
UnPosted? Including Payroll and A/P Invoices in Progress Tran
TypeDate Reference Description Additional Information Hours Job: VR0337 DOWNTOWN STREET LIGHTS
Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR
06/13/23 PR AVENAA ANDRES A AVENDANO Check# F44191 10.00 06/13/23 PR AXIOEA ERIC A AXIONOFF Check# F44192 10.00
2.00 06/13/23 PR LYONMR MARK R LYONS Check# F44215
ANDRKL KEVIN L ANDRADE Check# F44187
06/13/23 PR LYONMR MARK R LYONS Check# F44215
20.00 10.00
Printed by SMF as of 01/24/25 2:08PM
Subtotal for Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR
10.00 06/13/23 PR ZAVAR0 ROBERTO ZAVALA Check# F44244 10.00 Subtotal for Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR 32.00 Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR
06/13/23 PR
22x20Ft=440ft
Subtotal $1882.01
Tax $159.97
Total $2041.98
~JU.AME DA
£l.£C'rnlCAl DISTRIBUTORS
ALAMEDA ELECTRICAL DISTRIBUTORS,INC
7044AVE 304
INVOICE
PO BOX 760
GOSHEN CA 93227-0760
559-651-2096 Fax 510-785-4457
ALAMEDA ELECTRICAL DISTRIBUTORS.INC
3875 Bay Center Place
A-C ELECTRIC
HOUSE ACCOUNT VlSALlA
PO BOX 81977
BAKERSFIELD CA 93380
PVC 3-IN 300 SCHEDULE 40 PVC
CONDUIT 20FT LENGTHS
HAYWARD CA 94545
SHIP TO:
A-C ELECTRIC CO - HOUSE VISALIA
tipton and oak ave parking lot #44
VISALIA CA 93291
ENROLL TODA.YI
Go To https://alamedaelectric.bllltrustcom Use the enrollment token at the bottom of this invo,,ljf Have access to your invoices 24/7 'ff
Thank You For Your Business!
Web Enrollment Token: KGH PL T Z.WQ http://alamedaeleetric:.bllltrust.com All claims for shortage or errors must be made at once, returns require written authorization and are subject to handling charges. Special orders are non-returnable. This order is subject to the terms and conditions of our credit application. Overdue accounts will be charged a finance charge. 131142.02
\ 0.00
13~42.02
1 Day
Total $127.69
OUnited Rentals· "IIIN g ~ 4 WEEK BILLING
m O DJQ INVOICE
3 A-C ELECTRIC VISALIA BRANCH
'" 1035 W MURRAY AVE
m VISALIA CA 93291-4721
-8
~ Office: 661-410-0000 Cell; 559-679-7286
7.1.30511 MBo.528 81086S21.pOT 28!l171 HO
111Mr11h,1dll "' t,,11 llnll• 1111 •I.,,. rm Im •ur .. , ,HIJld AC .ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAI<ERSPIELD CA 93380-1977
RENTAL ITBMS,
~ liguipment Descript:ion
l. 10949061·· TRAILER TtL'l' 12 • -i6 • ""i.'o 9';99~1CT~ • • · Make1 TOW MASTER Model: T•9Di' 16'
Serial: 4KNBT232SKLl62613
1 l.059S346 MiNI EXCAVATOR ,,oo-9199#
Make: TA!OroCBI Model~ TB240
Minil'ltlll!I
Serial, 124002620 Meter out: 1435.BO "eter in: .co
l 907/0525 MINI EXCAVATOR iUCI<ET 121•
SALES/MISCRt.LANBOUS ITEMS:
_ ___,Q""t.._y :ttem
l CA PERSONAL PRO!? nx Rl!IMB CHAR!;B
COMMBNTS/NOTBS:
CONTI.CT: J02 MERCADO
CELLI: 559-556-5783
[DRStJRCAjMCI]
# 213602575-007
Cuat.Qaae:r:- # : 156339
rnvoic• Dat• : 06/01/.23
Dat• O\lt : ll/30/22 03:30 PM
Billed ~h : 06/14/23 00: 00
OR JQb Loa : 103S W MURRAY AVE, V
UR Jo2:I I : 430
Cuat0111er Job II>:
II .o. I ~ VR0337
R•qua•ted. By ~ JOE MERCADO
R•a•rved By : CLIFFGENESIS SALUDBZ
S&le•peri,on : BRW WHITE
Invoice Amount: $2,553.88
Tem11: CUI Upon Reoell)I
Pa~ CjlllOna: Ccln1lcl 01X Cid Office 70C-iJl6-,C877
REMIT TO: UNITED RENTALS (NORTH AMERICA),INC.
Day
312.00
Price
14,070
P.O. BOX05H22
LOS ANGELl;S CA 1l0074--1122
Week 4 Week Amount
1,034.00 1,876.00 1,876.00
N/C
Rent.al Subtotal 1 2,339, 73
ttriit of ?ifeasure Ex.tended Amt,
EACH
Sales/Misc SUbtotal:
llgl:'eeinent Subtotal,
Tax,
TOt:al:
l-4.07
}4.07
.2,353,80
200,08
2,553.88
Billing period, 2S Days From 5/l7/23 03:30 PM Thru 6/14/23 03:30 PM -t---....,..-----.~·'"'··""'·~--,---.:-..:_.,., __ . ___ ._. ____________ ,.. _____ ,._...,.. _______ _,_, ___ -'--,---J...- 11:!ec:tJ.ve January 1, .ao.a1 and whe:re pen1itted by I.av, IJ'Qited Rmitale may ilai;,e•• a 11u:rct,arge of' 1.s" !or cncU.t card pay.Rte on char1ie accocmte. ~• eu.rcllaJ:99, b =t g:roal:ar than = m9rchant ,Ullllowt rat.a fo:r cr•O.it card tra:uact:.J.onta alld ia subject ta •aJ.•• tax in •cme jurisdiction•.
lllO'.UCJl:i 'l'kilf :L~• 1e •llb:lect to tb• te=a and. cmr.d:ltiou of tba ll..elltal aua service ~•-t, wliich ue aftilabl• at ... .__.JJ_ .... ◄ ... ,1..-u1■ . .,.,.,1 ..... 1/ram:al-1«rvtc:=•-t•i,a••OS aii.d which are J.11eorpoi:&ted har,d.ii by re:~•- A C:OPr or 'rlll RBIITAL Subtotal $1416.00
Tax $95.28
Total $1511.28
Taxable
INVOICE
VIKING READY MIX SALES
( CUSTOMER # • • DATE I INVOICE NO. PAGE j
1830 S. MILLIKEN AVE., BUILDING G • ONTARIO, CA 91762
(909) 657-4000
00001234 06/13/2023 309337 1
06/13
06/13
06/13
06/13
06/13
SEND PAYMENTS TO:
AC ELECTRIC COMPANY
P.O. BOX 81977
BAKERSFIELD, CA 93380
VIKING READY MIX CO., INC.
C/O VIKING READY MIX SALES
15821 VENTURA BLVD., #475
ENCINO, CA 91436-4778
JOB NUMBER - JOB LOCATION -' ADDRESS
TICKET .NO; . QUANTITY • UNIT DESCRIPTION PRfCE PER
UNIT . TAX TOTAL
7332
PO NUMBER:
116-210521
116-210521
116-210521
116-210521
116-210521
CENTER &
VR0337
9.50 1.00
1.00 1. 00
1.00 LOCUST
CY 2.00SK SAND SLURRY
LD PUBLIC WORKS DELIVERY C
LD ENVIRONMENTAL FEE
LD FUEL SURCHARGE
LD LOW CARBON FUEL - SURCH
JOB TOTAL LINE
VISALIA
118.000
200.000
40.000
40.000
15.000
0.00 1121.00
0.00 200.00
0.00 40.00
0.00 40.00
0.00 15.00
1416.00
PRODUCT RECAP
SLURRY I L-1 --~ 9.50 NS20
1.00 555
1.00 530
1.00 525
1.00 520
2.00SK SAND
PUBLIC WORKS DELIVERY CHARGE
ENVIRONMENTAL FEE
LOW CARBON FUEL - SURCHARGE
FUEL SURCHARGE
TAXABLE AMOUNT
EXEMPT ])..MOUNT
SALES TAX
0.00 1416.00
0.00 TERMS: Net Due on Receipt. Delinquent if not paid in full within 30 days of in~oice date.
Delinquent accounts are subject so suspension and closure without further notice. In th_e event legal action is taken to collect this account, reasonable attorney's fees and costs will be paid by the Customer.
AMOUNT DUE ► 1416. 00
6=$74.28 W/Tax
2=21.70 W/Tax
8=$35.68 W/Tax
~ 1 IU..A.MEDA
/ ElECT/llCAL DIS;RIBlffORS
A-C ELECTRIC
AED/CST Br11
7044AVE304
PO BOX 760
GOSHEN CA 93227-0760
559-651-2096 Fax 510-785-4457
HOUSE ACCOUNT VISALIA
POBOX81977
BAKERSFIELD CA 93380
r C. 3--11"1 50090 900 CONO ELBOVV
78547
our # PVC90ELL300
PVC 3-IN 30090/36 36RAO 90DEG
068767
Your# PVC36RAD90ELL300
VC 3-IN 30045 450 COND EL
our# PVC45ELL300
PVC 3-IN 45DEG 36RAD SCH40 ELBOW
PVC 1-1/2 11245 450 COND ELBOW
Your# PVC45ELL 150
PVC 3-IN 300BE END BELL
Your# PVCBELLEND300
PVC 3-IN 300CP CONDUIT CPL
Your# PVCCOUP300
VC 1-1/2 11290 90D COND ELBOW
GSI)
our# PVC90ELL 150
INVOICE
ALAMEDA ELECTRICAL DISTRJBUTORS,INC
3875 Bay Center Place
HAYWARD CA 94545
SHIP TO:
A-C ELECTRIC CO - HOUSE VISALIA
tipton and oak ave parking lot#44
VISALIA CA 93291
120
257
~
✓sso
575
120
257
251
330
575
1020
218
3247.06
2570.00
5315.30
~8.81
2678.3!3
2196.67
~
ENROLL TODAY!
Go To https:1/alamedaelectric.billtrustcom Use the enrollment token at the bottom of this invoice.
Have access to your invoices 24rT
SUBTOTAL
Thank You For Your Business! SALES TAX .oo y
FREIGH
T k KGH PLT Z.WQ :J Joo SSlS,16 1007 197 1.08 Web Enrollment o en: http· /alameciaeleetric.bllltrust.com All daims for shortage or errors mu. st be made at once, retums require written authorization and are subject to handling charges. Special orders are (, non-returnable. This order is subject to the terms and conditions of our credil application. Overdue accounts will be charged a finance charge.
Pag 1 of 1
AMOUNT DUE
CALTRANS ROW
CITY OF VISALIA DATE: 7/26/2023
VR0337 DWR DATE: 6/14/2023 SOS 6/13/23
AREA DWR NO.: 142749
CONTRACTOR REPORT NO. Rpt 10
CR NO.: 63.02
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV521 F-250 XL REGULAR CAB, VPUT [TRUCK] T&TT 20-28 1.5 34.49 $ 0.87 0.15 51.74$ 2 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 1.5 53.72 $ 0.87 0.15 80.58$ 3 - $ - $
4 - $ - $
5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 132.32$
15% Markup 19.85$
Total Equipment 152.16$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 213602575-007 UNITED RENTALS 6/1/2023 1 $ 127.69 R $127.69 11 59684 KRC SAFETY 6/23/2023 1 $ 388.87 S $388.87
12 309430 VIKING READY MIX SALES 6/20/2023 9.5 $ 174.87 M $1,661.27 13 14
15 Subtotal Material, Subs, and Rentals 2,177.83$
15% Material Markup 249.19$
10% Sub/Specialists Markup 38.89$
15% Eq Rental Markup 19.15$
TOTAL MATERIAL, SUBS, and RENTALS 2,485.06$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 1.5 75.04$ 28.60 $ 0.11 172.56$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 1.5 66.35$ 28.34 $ 0.11 157.65$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 330.21$
35% Mark Up 115.57$
Total Labor 445.78$
SUBTOTAL 3,083.00$
-$
3,083.00$
D
ESCRIPTION St art od Shift 6/13/23 Remove trench plates finish slurry on Court 22+69,25+00,and 17+08. Replace trench plates. Slurry is from today.
A-C Electric Company
CUSTOMER
REFERENCE
A-C JOB NUMBER
CUSTOMER JOB #
TOTAL COST THIS REPORT
Invoice Description
MINI EXCAVATOR RENTAL
TRAFFIC CONTROL
SAND SLURRY
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.01 June\CR 63.02 June EWBPrinted 2/7/2025 ,(J_e EJ.� e� -CALIFORNIAC·10LICENSE99849
ENGINE ERIN G-C ON STRU CTI ON-TECHNOLOGY-SERVI CE
Daily Work Report
DWR#: 142749
Submitted By: ROBERTO ZAVALA on 6/15/2023 4:46:46 AM
Job/Work Order Number
VR0337
Dat e
2023-06-14
CCO No./Area
Required for M and R jobs
Cr63.01
Site /Location
Court
Division
Visalia
Description of Work
Job Name
DOWNTOWN STREET LIGHTS
Jo b Hom e Local
100
P.O.Numb er
Customer
CITY OF VISALIA
Local Repo rting To
100
QuoteorT&M
0 Quote
Work Completed?
0 Yes
&T&M
Remove trench plates finish slurry on court 22+69,25+00, and 17+08. Replace trench plates. Slurry is from today.
Employees
Technician
ROBERTO ZAVALA
�--------
I KEVIN LANDRADE
M aterials
Dispatch Time
05:00AM
05:00AM
End Tim e
06:30AM
06:30AM
Class ST OT
F O 1.5
J 0 1.5
DT TT Adders
0 0 0
0 0 0
Verd
0 0
, __ Q::-ty::_,_ __ U::..cO.:.M_:_ _______ --'M-'a=-t:.:e::.ri--=•::.I _______ _ ____ V::.e::.n_cd:co:.:r:./T:.:r--=u--=c :.:
k-.:S.:.to:.c::.k:_ _____ .:.P.:.a.:.c::.ki.:.n"g-'S-'-li-"p-'N-'-o:.:. ------:
9.5 Yards 2 sack sand slurry Vendor
Equipment
_ _.:.A.:.·...cC_Ow::.::._n_ed_/R_e_n_ta_l ____ H_o::.u_r_s _____ A_-C Eq. #/Rental Agency I A-COwned____ _1.s____ MV521
, A-C Owned 1.5 MV 653
Rental 1.5 10949061
i Rental /,) 10595346
Subcontractors
Ticket No. Company
KRC Traffic control
1 913110
Miles Equipme n t Des�E!!?_tion --------�·
0 Traffic truck
0 Hwy truck
0 Trailer ___ _:
0 Mini ex
Subcontract- Direct Job Item _________ _
Approved By
Customer Representative ...
James Grier
Completed By
Field Representative. ..
Roberto Zavala
2 Customer Signature
�\Cr
i::'i2..C J,, (-\('7
Add Signers
0 Yes
1 Day
Total $127.69
OUnited Rentals·
MUt'2I' 6fl JUNO 9 2023
4 WEEK BILLING
INVOICE
935 ml.Rm BlrN .liW)ZlOX Dl'
vrBALu CA 93292-6620
!15!N1.Z1-51U
_3 A-C ELECTRIC VISALIA BRANCH
...t 1035 W MURRAY AVE
Ul VISALIA CA 932.91-4721
'8
~ Office: 661-410-0000 Cell; 559-679-7286
7.1.30511 MB 0.528 81<J65S21,p0T 288171 1-2 O
1l1fal"ll'J'lrlllf rtJ,llf h rJl • •Jf' rl1I 11 lflf 1111111 f uf ,IIIJI, J
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITBMSi
# 213R02575-007
CUatcimez- i : 156339
lDvoie• Dat■ : 06/01/23
Date Ol.lt : 11/30/22 03 :30 Pl-l
Sillad ~h : 06/14/23 00: 00
l7R Job Loe : 1035 W MURRAY AVE, V
UR Job # : 430
Cuatcmer Job In:
P .o. I : VR0337
Raquated By : JOE Ml!:RCADO
Reserved. By : CLIFFGENESIS SALUDSZ
Saluper11cm : BRYN WHITE
Invoice Amount: $2J;53.88
Temia: Cue Upon A«lelpl
P•ymenroptbrla; Ccmacl Oll'ClllCII office '°4-itl6-<1877 REUIT TO: UNITED RENTALS (NORTH AMEAICA),lNC.
P.O. BOX 051 SZ!
LOS ANGELES CA 90074-1122
_. ~ !guipment Descriat:ion -----'•!!!=ni=mu=m=-__ _,;D:;:au;y ___ .!!We:::ek~ _ __,;4:....!'111!!:e~ek;!!,..__ ---=Amo __ u.n=-=t--t l io~4906l·- TAAILDT:tt.T I2•"i6'TO ~;99-n~ ··-
Make: TOW MASTER Model: T-9DT l5"'
Serial: 4KNBT232S1CL162613
l 10595346 M:INI EXCAVATOR 7400-9199#
Make: TAKEUCHI Model; TB240
serial, 124002620 Meter out: 1435.80 Meter in: .oc
1 907 /052S MINI EXCAVATOR BUCKBT 12 1'
SALES/MISCRLLANBOUS ITEMS:
_ __,o""t"'y Item
1 0. PERSONAL PROP TAX .RBIMB CHARGB
COMMBrlTS/NOTBS:
CONTACT: J01J MERCADO
CELLI: 559-5S6-5783
(ORSORCA/MC:t J
312.00
Price
14.070
Billing period: 2B DAyB Prom S/17/23 OJ:30 PM Thru 6/14/23 03:30 PM 4fl~.73
1,034.00 1,876.00 1,876.00
N/C
Rental Subtotal, 2,339.?3
Unit of Meaaure Extended Amt.
BACH
Sales/Miec SUbtotal:
Ag~ment Subtotal:
Tax,
TOtal:
u.01
~4.07
2,353,80
200.oa
2,553.88
IU•c:t:.iv• J&1l1.lll'f 1., .20ll1 llmd whei:e pen1itt.d by law, ll'Uited. R8!1t&lll Ill&)' :l.mp:oa ■ a 1J12rc:bll'ge of 1.. 8\ tor uecUt card payiauta on e~e ac:eow:it:s. Thia a11.:cllarg9 :la -aot great:ar tbazl our 111.rch-=:: ,:U.acoiu,t rat;a for c:r•dit card tr&Daact:lons &114 i• sub:lect b:I aale• tax .i:o. ■ cme ~=Ud.ic:t:l.o,na.
lllO'.t'iCJI:, T1'b tnwlea b 8@jact to tba terms imd c:Ol:ldit:l.r;,~ of U• ~tal rm4 senriee ••-t, vbich are available at ....... __ 11- .... ~ ..... ..-u.1■ _,,,,,.,1 .... 11~1-a~c••t•i:m••"O'S llSl4 W21i<::li ai:·e iiico.rpoi:at•d h■reiii by ~•f•reiu:•. A COPT or ~ JUClffJIL 1 HR = $194.43
2 HR Total $388.87
TRAFFIC CONTROL~ SAFETY SUPPLIES ~ EQIDPMENT RENTAL~ TRAFFIC DESIGN Invoice
SAFETY CD-, INC .
P.O. Box 6356 Visalia, CA 93290
Ph# 559-732-0393 Fax# 559-732-2684
Bill To
Date
6/23/2023
Job Info:
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA93380-1977
9-22-01/CITY OF VISALIA DO\VNTO'WN ST LIGHT
VISALIA
VR0337
P.O. No. Terms Due Date Ordered By:
VR0337 Net30 7/23/2023
Date Item Description Quantity Rate
1 06/11/2023
06/11/2023
06/11/2023
06/12/2023
06/12/2023
06/12/2023
b6/13/2023
b6/13/2023
2man001
Overtime
Arrowboard - A. ..
2man001
Overtime
Arrowboard - A ...
2man001
Overtime
.. ......__.......vv.1..
2 man lane closures - 1-8 hour Sunday shift
Overtime -Per hour(8-12 hours)
Additional arrow board(s) per shift (includes lane)
2 man lane closures - 1-8 hour shift
Overtime - Per hour (8-12 hours)
Additional arrow board(s) per shift (includes lane)
2 man lane closures - 1-8 hour shift
Qvertime -Per hour (8-12 hours)
.r.. ......... . .1GU.Lv i;.;.1.u:::.LU ~ - 1-0 uuur :SilllL !\;,. '06/14/2023
i
Overtime Overtime - Per hour (8-I 2 hours)
t,'-'1 06/15/2023
flt, 06/15/2023
l
2man001
Overtime
2 man lane closures - 1-8 hour shift
Overtime - Per hour (8-12 hours)
INDEMNrTY AGREEMENT. All ltc,rn,; covered by th;,; Documc:nt-,,h,,ll b,e '°tth,e ,;olc: n,;k of t::he Cu$tomer~ CU~t:oc·•,u~r,3s.:ree:: to d,e<fcr"d .. lndemn1fy ~nd hold hz:i,.n"III,::~~ K'RC SAFETY CO . .,. I~ office~ .. dl~c:tor:.: and empl oy,ees.,. from ~nd 31~Jnt;~ any iiind ..:,U Uablllt:y- cl:aJll"'t'ts.,.J ud~cn~ .. c:o~:t:s:., ~ttorney "fcc:e., or dcmond::;. of-liti:;::o'tion nrt~n:fron, t:hc use, rn:aintcn:on c e, opcn:iition.,. or po=e=1on of the cqulprncnt Jnc:t udin2t but not UmJt'.,ed 1»., 'tho-s.e arl-:;.i ns: 'from the ::,c.tive nit:s;ll cc nee of KRC SAFl:TY co ... IU offf.c-cr:;:, dJrcct-or:;: ~r)d empley~cs .. frot;i,rn in.J....-y to or deaU, of'the: Cu:;t;omer., Cu~'tomc:r"'s employ~-=::.- ... or ~ny other pcl""Son., orfrorn d~rn:2as:e to any proper-ty,. ,::3ve ~nd ~ceptthcre s::haJI b,e no obllptlon on the part of 'the Cu.:o;:t::,o,rner"t:.o defend., indemnify '9nd hofd h~rmlc~ ~RC SAFETY CO . .,. t't:;. off-leer.:::., dir'cc;.tol""!;., ~nd ernpJoyc:c::1.,. If the llobillfy.,. c:lbim::;:: .,.JYd::rn.e:nt~ ... c;o:;;~ ~ttornc:y:,. fee:::..,. or die;mond:;. of H~s:o-tton 01:hcrwi:;e z}vl ns: ri~e to ~uch OblL~'t;I on ~n$c from. the sole- noe:s;::lls:enc1t Or" wlllf~t i""hfSCOhduct Qf KRC SAP f;TV co ... 1~ officers,.. din::cto~, .:,ind cmploycc:s:. If c,..astomcr refuS-.c:.: to defend.,. I ndcrnnlfy .and hold h~rrnle= l<RC SAFE'r\' co.,.. Jt:;:. offic::er::,,,. dircc-1:or~ .. ond ~r"l'ls::,Joycc:::. ~nd :s,u~cq, .. u::nt:ly,::, dct:ermfn::a:tfoni~ m~dc th::.t:
Ji::,bfllty l$ not due to t-h,e :t:-01 o:, f"IC:£:;IIS.ef"\ace o..-w1llful rnl~ond1,,1:c;1; of KRC SAFETY CO.,.. Jt-:::: offic:er. dlr-e.ctol"'$.,. ~nd cm9J O'ye,l),.~., Cu==toTncr I!:. obll~ted to rie:lrnbu.n;,e; any ~nd :,,II Uabl 111:.y, cJ:::a.1 ~ ... J udi;.me.nts:., coat:., ottorn-=:y.:; fee:~, or dcm~nd::i of 111.;i,e;~tion 1 ncuf'T'IC:d by KRC SFAETV CO.,. i~ offi ccr.:;;.,. di rector.:.:,. .:::iind en,ployce,:;. Cu:s:~mcr- ~~cc:;; tc. nottfy KRC SAF CTY CO~ J m mcdf:::.tcly in c~c o'f ~ny ~eel den1= ~nd to obtain the n:."!lllr-nc.$.., ~ddrc-s:~es: tel ephon.ie: numb~ :.!lond othe~ p,er"'tJ nent: 1 nforc-nzt:ti on from ~JJ p;!u"U e~ •nvoJved and :all \NSt:ne::t!::e:&.
1 8
1 l
7 1
1 4
1 3
2,215.50
115.00
75.00 1,555.50
115.00
75.00 1,
.,
1,555.50
115.00
1,::,::,::,.::,u
115.00
1,555.50
115.00
' >
'
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59684
Amoun t
2,215.50
920.00
75.00 1,555.50
805.00
75.00 1,555.::,u
460.00
1,555.50
345.00
'I'
Voo
$11, 62.50
'
I
$0.00
,~l,16 2.50
I
,
'
Subtotal $1416.00
Tax $95.28
Total $1511.28
Taxable
/
---- ~ -- JUN 2 0 2023 INVOICE
( CUSTOMER # I DATE I INVOICE NO.
VIKING READY MIX SALES
1830 S. MILLIKEN AVE., BUILDING G • ONTARIO, CA 91762
(909) 657 -4000
00001234 06/14/2023 309430
I DATE
I
06/14
06/14
06 / 14
06/14
06/14
06/14
06/14
AC ELECTRIC COMPANY
P.O. BOX 81977
BAKERSFIELD, CA 93380
SEND PAYMENTS TO:
VIKING READY MIX CO., INC.
C/O VIKING READY MIX SALES
15821 VENTURA BLVD., #475
ENCINO, CA 91436-4778
JOB NUMBEA - JOB LOCATION - ADDRESS I PRICE
1~:1
TAX
l TICKET NO. I QUANTITY !UNIT I DESCRIPTION l
7335 CENTER & LOCUST VISALIA
PO NUMBER: VR0337
116-210622 9.50 CY 2 . 00SK SAND SLURRY 118.000 0 . 00
116-210622 18 . 00 MN DELAY MINUTES 1 . 500 0 . 00
116-210622 1.00 LD PUBLIC WORKS DELIVERY C 200 . 000 0 .00 116-210622 1.00 LD ENVIRONMENTAL FEE 40 . 000 0.00
116-210622 1.00 LD FUEL SURCHARGE 40.000 0.00
116-210622 1.00 LD LOW CARBON FUEL - SURCH 15.000 0.00
116 - 210622 1.00 EA RETURN CONCRETE SURCHAR 150.000 0.00
JOB TOTAL LINE
SLURRY I I
PRODUCT RECAP
9 . 50 NS20 2.00SK SAND
18.00 543 DELAY MINUTES
1.00 555 PUBLIC WORKS DELIVERY CHARGE
1.00 530 ENVIRONMENTAL FEE
1.00 520 FUEL SURCHARGE
1. 00 525 LOW CARBON FUEL - SURCHARGE
1.00 535 RETURN CONCRETE SURCHARGE
IF PAYMENT IS MADE BY 07/10/2023, DISCOUNT FOR INVOICE IS 19 . 00.
PAGE j
1 ' TOTAL
1121 . 00
0.00 200.00
40.00 40 . 00
15 . 00
150 . 00
1566 . 00
TAXABLE AMOUNT
EXEMPT AMOUNT
SALES TAX
0.00 1566.00
0.00 TERMS: Net Due on Receipt. Delinquent If not paid in full within 30 days of invoice date.
Delinquent accounts are subject so suspension and closure without further notice. In the event legal action is taken to collect this account , reasonable attorney 's fees and costs will be paid by the Customer.
I AMOUNT DUE ►l 1566 . 00
CALTRANS ROW
4/4/2016
VR0337 63.03
AREA
COST SUMMARY
Line Date DWR Quantity U Unit Price Amount
1 7/6/2023 SOS 7/5/23436 1 E 38,746.54$ 38,746.55$ 2 7/7/2023 SOS 7/6/23467 1 E 15,419.16$ 15,419.16$ 3 N/A N/A 1 E 17,139.98$ 17,139.98$
4 -$ -$
5 -$ -$
6 -$ -$
7 -$ -$
8 -$ -$
9 -$ -$
10 -$ -$
71,305.69$
A-C Electric Company
CUSTOMER Date:CITY OF VISALIA
CR No.:
REFERENCE
CUSTOMER JOB #
A-C JOB NUMBER
Cost Summary Total
Printed 2/7/2025
I I I I I I
....___ ___________ _____.11
CALTRANS ROW
CITY OF VISALIA DATE: 7/31/2023
VR0337 DWR DATE: 7/6/2023 SOS 7/5/23
AREA DWR NO.: 436
CONTRACTOR REPORT NO. Rpt 1
CR NO.: 63.03
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV707 DUMP TRUCK 3 YRD TRUON TRUN 2AXL 4 45.02 $ 0.81 0.21 180.08$ 2 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 8 53.72 $ 2 0.87 0.15 523.23$ 3 S1706 SKIDSTEER, BOBCAT, EMSS HCESP BOBCAT CTERRA 4 43.69 $ 0.88 0.13 174.76$ 4 MV318 TRAILER (4 TIRE)18' WIRE, TRR TRAIL LB-A 100 4 15.01 $ 0.63 0.43 60.04$ 5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 938.11$
15% Markup 140.72$
Total Equipment 1,078.83$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 213602575-008 UNITED RENTALS 6/29/2023 1 $ 127.69 R $127.69 11 59918 KRC SAFETY 7/14/2023 1 $ 1,488.74 S $1,488.74 12 1 YARBS GRADING AND PAVING 7/31/2023 1 $ 27,727.66 S $27,727.66 13 213602575-009 UNITED RENTALS 7/19/2023 1 $ 226.06 R $226.06 14 15
Subtotal Material, Subs, and Rentals 29,570.15$
15% Material Markup -$
10% Sub/Specialists Markup 2,921.64$
15% Eq Rental Markup 53.06$
TOTAL MATERIAL, SUBS, and RENTALS 32,544.85$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 10 75.04$ 28.60 $ 0.11 1,150.39$ 100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 10 66.35$ 28.34 $ 0.11 1,051.01$ 100-A7 A7-75% JOSE M MARTINEZ 33.36 $ 24.31 $ 0.11 10 50.04$ 36.47 $ 0.11 960.26$ 100-A9 A9-85% ERIC A AXIONOFF 37.71 $ 25.66 $ 0.11 6 56.57$ 38.49 $ 0.11 633.05$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 3,794.71$
35% Mark Up 1,328.15$
Total Labor 5,122.86$
SUBTOTAL 38,746.54$
Subcontractor Markup -$
38,746.54$
Start of Shift 7/5/23
Sta
rt removing plates from the following lkocations 24+76,21+67, 14+66, 12+65 lanes 1 and 2 on Locust then on Court locations 10+90,13+59, 15+13,16+15,17+08,18+69,22+69,25+00 for lanes 1 &2. while work is being performed onb Locust coordinate preparations for Court than while work is performed on court coordinate preparations for COurt then while work is performed on court coordinate preparations to finish work on locust by swapping traffic on close Lanes 2 & 3 then start removing plates from the followinmg locations 24+76, 21+58, 14+66 , 12+65.Load plates on trailers a m aximum of 6--8 plates depending on the limits of the trailer and isze and weight of the plates (this task takes a minimum of 2 guys do to the size aned weight
of the plates)(one guy operates the heavy equipment capable of ligtingh the plates, while teh other uses a magnetic tagline to position the plaes accordingly and safely) cont. on dwr
TOTAL COST THIS REPORT
DESCRIPTION
A-C Electric Company
CUSTOMER
REFERENCE
A-C JOB NUMBER
CUSTOMER JOB #
Invoice Description
MINI EXCAVATOR W/TRAILER
TRAFFIC CONTROL
PATCHING PAVING
MINI EXCAVATOR
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.03 July EWB - REV 250206 Printed 2/7/2025 � T.Rr0 ..., " "' :c
0 "
-A-e Ckc.buc e�an'f - CALIFORNIA C-10 LICENSE 99849
0 0
1' ENGi NEERING-CONSTRUCTION-TECHNOLOGY-SERVI CE
DWR JD#:436 Daily Work Report
18! Draft D Approved D Rejected
* Required
VR0337 DOWNTOWN STREET LIGHTS V 7-6-2023
*Job/WO Number • Job/WO Name
DOWNTOWN VISALIA MAIN ST, CENTER AVE, ACEQUIA VISALIA, CA 93291 "'Site/Location
100 100
*Local Reporting To PO# * Job Home Local
Roberto Zavala [email protected]
*Submitted By •submitted By Email
*Work Completed? Qves .No
Coordinate wilh NV5
Coordinate traffic control with KRC locations and time
Coordinate with YARBS locatlons and time
Coordinate material and equipment needed for task with AC shop crew
CITY OF VJSALIA
*Customer
*Div * Report Date
Cr63.01
CCO No./Area
• Q Quote .&M
7-10-2023 2:22 AM
*Submitted Date/rime
"'Previous Time Submitted?.Yes
Coordinate with AC fle[d crew time and location sequence in which to start removing plates from the following locations 24+76, 21+67, 14+66, 12+65 lanes 1 and 2 on locust Then on rourt locations 10+90,13+59, 15+13, 16+15,17+08, 18+69, 22+69, 25+00 for lanes 1 and 2 While work is belng preformed on locust coordinate preparations for court lhen while work fs perfonned on court coordinate preparations to finish work on locust by swapping traffic an close lanes 2 and 3 then start removing plates from the followlng locations 24+ 76, 21+67, 14+66, 12+65 load plates on trailers a maximum of 6-8 plates depending on the limits of the trailer and size and weight of 1he plates (this task takes a minimum of 2 guys do to the size and weight of the plates) (one guy operates the heavy equipment capable of rifting the plates, while the other uses a magnetic tsgl!ne to position the plates acc.ordingly and safely) Ship the plates back to the yards staging area
Unload and brush off plates then stage them appropriately (this task takes a minimum of 2 guys do to the size and weight of the plates) (one guy operates the heavy equipment capable of llftlng the plates, while the other uses a magnetic tag line to position the plates accordingly and safely) Coordlnata with AC shop c«m to have the plates, materials and equipment hauled off Go back threw all locations and load up all cold patch and debris left behlnd from work being profom,ed Gall off traffic control
lmages
Rj?/23 Page 11
�C'l'T<t0 " "'
I
Daily Work Report
DWRID#:436
fg! Draft O Approved D Rejected
,s-l'n; u C
0 • - -
Technician
-,
ROBERTO ZAVALA-ZAVAR0
KEVIN L ANDRADE - ANDRKL
JOSE M MARTINEZ - MART J6
ERIC A AXIONOFF - AXIOEA
Rj7/23
Dispatch lime I End lime
8:00PM
8:00PM
8:00PM
8:00 PM
' '
Class ST OT
F 10
J 10
A7 10
AS 6
*Required
TT l "...Totai .:-1 Adders I Verd I ............. I
. ·.-.·._
.
. : •
·:-:·-·,·.:··
<•:···
' '
Page I 2
:
I
I
I
!
l I
!
:
I
I
:
I
I
: I
I
I
I
}
I
I
I
;
I
l
i
I
I
!
;
I I
:
t I
I
l 1
...... ·::.: -
' • _· \ '
l
I
I
I
I
I
l
I
I
Daily Work Report
DWRID#:467
IZI Draft D Approved D Rejected
- -· -"--~--- -.-
·Materials
Vendor/
,, '
Qty Material Truck Stock
"'Approved By Signature
Customer Representative
James Grier
• Approved By Full Name
D Add additional employee page.
Rl7/23
' '
• • � I
Packing Slip #
: i
'
A-C Owned/
Rental
Rental
Rental
Rental
A-COWned
A..COwned
A-COWned
A-COWned
Ticket 11
Ta
Ta
H I AMC Equip.#
/ours I Rental Agency
4 111177296
4 10949061
4 i10595346
4 iMv707
4 iMv653
4 ls:1706
4 h1a
I Company
•completed By Signature
Field Representative
Roberto Zavala
*Completed By Full Name
"'Required
Miles Description
lnl ex
IT railer'
!Mini ex
!Dump truck
iS!ckl steer '
h-ra!!erI
�
Subcontract-Direct Joh Items
raffle Control '
Paving '
Page I 3
· -· . . ~ • ;• --· ..... . -. . . . . rn9~;~~~-;~~--::~:·:::: . .: .:.· -- . \i . -. ·. _: -:-:._·-\ ,_--~,~"-"'.~_ -_ ~ . -,.-:::· -~ _~ -• .-. -:: ~- :-::1 I
I
I
I
.
I
I
I
! I
I
I
i
! righway truck
a I
I
I I
I
,. .. ,)
SObcontracto'rs -· .. .. ✓".;
•, . "
Please see cost break down on next page
l ''·t
··1 !&
17 TRAFFIC CON1ROL ~ SAFETY SUPPLIES~ EQUIPMENT RENTAL~ TRAFFIC DESIGN Invoice
§.A.FETY co_,, INC .
P.O. Box 6356 Visalia CA 93290
Ph# 559-732-0393 Fa,-# 559-732-2684
Bill To
Date
7/ 14/2023
Job Info:
AC ELECTRIC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALIA
VR0337
P.O.No. Terms Due Date
VR0337 Net30 8/13/2023
Date Item Description Quantity
07/03/2023 2 man 001 2 man lane closures - 1-8 hour shift 07/05/2023 2 man 001 2 man lane closures - 1-8 hour shift 07/05/2023 Overtime Overtime - Per hour (8-12 hours)
07/05/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) 07/06/2023 2 man 001 2 man lane closures - 1-8 hour shift 07/06/2023 Overtime Overtime - Pa hour (8-12 hours)
07/06/2023 Arrowboard - A. .. Additional arrow board(s) per shift (includes lane) ****** Please note, per the agreed upon quote, rates
have increased by 2% as of July 1st 2023
********•*****
INDEMNITY AGREEMENT_ All 1~,cr-n;S: cov,er,c:d by th•~ Oocumcn't ~h~I be: -::.t:the: 'Si,0lc n:;.k of t:h~ <::us:"tome.r. Cu~torT1e-r .z,:r,e,it$. ~o defend., tndomn)fy ond hold hornilc::~ KRC S-Af" C TY CO .... •~s 0H1c~l"'!'.I ... d• .-..;tors .e-nd el"Oi::,I Oyaces,. from and •i:tu nst any and en lt:ab~ll,:,y ct-.. .-n~ .. J ud1:~c..,,ts., costs,. a-ttorn-ay fe-e,s::,. or dot:rYtG:nd'$1 of tlt,~~onaniuns:frorn the \.l:fil<t:., molnt:cnttncc,. oocrot:ton .. or pog::s:,e~:!J,lon of the c Q u$prn"'!:nt lndud•..-.s: but no,: lln-tltcd ~ .. t:ho:t-c o,..1!14nc from the nct, v -,: n"!'i,:l1~enc4; of KRC SAl'f!.TV CO.,. Its c.>fflC:cf"5, d~..-~c.torz; a"d crnplO")l',ce~ .. from Injury to Or" death olf t-hc Cu-:;torner .. C.Ustome-r'-:. omployllll:!:c s:,. Or" .l)ny o,;hel'" Pot:"ric:on,. ortrorn d,ern,i.c_"2 'to •ny propeJ"'t¥,. s.av• •nd <t'X<:ieptt:hcre 1'hall bcr no obliJCDt\on on t:he pnrt ot the ~storncrto defend,. JndcrnnU'y ond hold horrnless KRC SAFETY CO., lb off,ccr,,. dlrectors ... and er"l')ploy,ec:$,. if,:h,e 11,a,~hfy,. c:loh-n$ .. Jud:,ncnt:s.,. ~ost,: ot'l;orn,eys fees.., or- dem:i:,n.d-,: of ht1i:m,1;~on oth-c:r"Wt!.c 1,;•~ ns;:: ns:.e- to 1.-u,::h obll~t• on &r'I:,:• f...-o...-. "t;h,c- so1<e" n...,~t•i::•nce orw,llful n,,l<J::,c;ondu<:t: of K~C $.AJIII= e--rv C:::O.,. ~t~ offlccni,. directors .. ~nd Cr"OOIOycc:s. It Cusstorncr re:fu-scs to d"1:1e:nd,. 1nd1::l'n,...lfy ond hold har,..-,acss KRC s.Af'.f:TV CO ... lt'S ot'f1cf'::~ .. director$,. ~nd c..-npt,oyc,:-S .-nd sub::.ec:auc:ntly::, drterrntnet.1 on IS mode t.hct II abll•ty I:-;: l"llO't dvc: 't;O the ~ol c ned•i:::c-nc.e- or W1 Jlft,,J rn1,:.conduct. of KRC :::Af' e.TV CO . ., IU of11cer,.. di rce:ctor"!';. ;mnd crrnpfoye-,ec;,. Cu"St:orn'f!r I$ Oblipt;,c-d 1::o r"lmburs,e any and all hab1r1ty_ cll!N,•Yu~ .. Jude:n'IC"~ .. ir::oo.t,. &ttomcy,s f,c,c,s,. or dc:mond~ of IIOc:aUOn lncun-.:.!d by KRC SFAETV CO.,. It~ offlC'C!'~~ dl,.-a!-G:'tOnt.,. or,d ,crnplovc:cs. eu-,~orncl"" -tt.t:1:rcc:~ to notify KRC SAr"VY co.~ •m.-n¢d•~~ly 1n .a:.sc: of ony acc1 dent ;ond to obta, n the n~rn.e-s .. nddl"',e~~c~ .. t,c,lc::phon<lt numbers bnd othor pc-:n::t n<-n"t: t nforNt~UOI"'\ fr"'Om oll p•r"'1:i ie:,:
1 nvolv-e:d -1:1nd otl ........ttne?:Cse£..
Ordered By:
Rate
I 1,586.61
I 1.586.61
8 115.00
2 75.00
l 1,586.61
4 115.00
I 75.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59918
Amount
1,586.61
1,586.61
920.00
150.00
1,586.61
460.00
75.00 $0.00
$6,364.83
S0.00
$6,364. 83
DWR #
Contract Hrs CT ROW EW HRS Supervision HRS
4.00 4.00
3.00 3.00
3.00 3.00
3.00 3.00
4.00 4.00
3.00 3.00
3.00 4.00 4.00
3.00 3.00
2.00 2.00
10.00 10.00 9.00
10.00 6.00
10.00 10.00
29.00 36.00 3.00
Hours % worked 45% 55%
7/14/2023 KRC INVOICE 59918
2-man lane closer 1-8 hour shift 1,586.61$ 707.87$ 878.74$ Split per % worked Overtime (8-12 hours) 920.00$ 460.00$ 460.00$ Split per % worked Arrow Board 150.00$ 150.00$ Arrow Boards on CT ROW EW only 1,167.87$ 1,488.74$
CR63.03 Rpt 1, Amount 1,488.74$
Subtotal for Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR 36.00 Printed by SMF as of 01/24/25 2:23PM
07/06/23 PR ZAVAR0 ROBERTO ZAVALA Check# F45080 10.00
07/06/23 PR MARTJ6 JOSE M MARTINEZ Check# F44921 10.00
07/06/23 PR AXIOEA ERIC A AXIONOFF Check# F45027 6.00
Subtotal for Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR 32.00 Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR
07/06/23 PR ANDRKL KEVIN L ANDRADE Check# F45022 10.00 07/06/23 PR ZAVAR0 ROBERTO ZAVALA Check# F45080 2.00
07/06/23 PR LYONMR MARK R LYONS Check# F45051 3.00
07/06/23 PR LYONMR MARK R LYONS Check# F45051 4.00
07/06/23 PR LYONMR MARK R LYONS Check# F45051 3.00
07/06/23 PR CHAVAM ANTHONY M CHAVEZ Check# F44885 3.00
07/06/23 PR CHAVAM ANTHONY M CHAVEZ Check# F44885 4.00
07/06/23 PR CHAVAM ANTHONY M CHAVEZ Check# F44885 3.00
07/06/23 PR AVENAA ANDRES A AVENDANO Check# F45026 3.00 07/06/23 PR AVENAA ANDRES A AVENDANO Check# F45026 3.00 07/06/23 PR AVENAA ANDRES A AVENDANO Check# F45026 4.00
A-C ELECTRIC COMPANY
Job Cost History Report From 07/06/23 To 07/06/23
UnPosted? Including Payroll and A/P Invoices in Progress Tran
Type
ANDRES A AVENDANO
ANTHONY M CHAVEZ
MARK R LYONS
Date Reference Description Additional Information Hours Job: VR0337 DOWNTOWN STREET LIGHTS
Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR
DAILY EXTRA WORK REPORT
CONTRACT NO,
SPECIFICATJOII NO.
WORK PERFORMED BY Yarbs Grading and Paving, Inc.
DESCRIPTION OF WORK Patch Paving for NVS on 7-5 and 7-6
CONSTRUCTION EQUIPMENT
DESCRIPT!otl UNIT COST
91.58 2250
B
SIGNATURE VERIFIES TIME, LA· IFICATION, MATERIAL E IPMHIT,
DATE PERFORMED
DATE OF REPORT
6-Jul-2023
31-Jul-2023
(RATE) X
TOTAL LABOR COST A
15.00% 'h 011 MATERIALS & EQUIPMENT COST
EXTENDED
COIJ'STfWCTIOIJ EQUIPMENT, AND HAUUNG OF COIJSTRlJCTION EQUIPMEIIT. &�J!�'i""• 0i/i;ii�iq,wia�<>ioi 4�?S\�l�il§ft�S?:. -�¾£�1JtM:�!I�� ------
DWR INSPECTOR DAlE COIITRACTOR'S FORHWl/SUPi:RllfTENOENT DATE DWR FIELD El.'GHIEER DATE COl{fRACTOR'S REF-RESENTATIVE DATE DWR 2832 (Rev. 4/98) For instructions, see reverse side. % ON HAUur;c; OF CONSTRIJCTIOll EQUIP. (DJ
TOTAL THIS REPORT
Origlflill: Project He.idquarters
Copy: Co�tractor
Copy: !n5pector
$27,727.6
5\JBSISTH
r~v1::::: : -. ·•··•••··. -• ..... •• • .. • .. • .. •·· :tr~iitwa-.._" ·:", .
OTiifR
~ --•• ,O••·
CONTRACT NO,........c/\lJ�V.���-------
SPECIFICATION NO. __ �-�---�-
WORK PERFORMED BY_�y;�.,._,-�_J,_S:��6�-�cf,�"''""'',___ D PTO F ............ ;,_<-/.:. , ESCRI I N O WORK j, -
,.,,, ""�
l
41 DAILY EXTRA WORK REPORT
YARBS
DATE PERFORMED _.,_7_-...,6'"'--_,:2""'-'3"-_lv�•=l.�•\:�l...,C�J\��7 ( "' u grading < paving DATE OF REPORT _
L
_
i
_c_e_n_s_e_
#
-
96 _
4 _
0 _
7 _
1 _
- 01\ ..... " tr ........ v / oe«> C,I\ ,9 l + <.,V'
(',- M,r- ...,_c-...w-,,A \;
, -� <'><\11' ,I.,.
EQUIP NO. CONSTRUCTION EQUIPMENT HOURS RATE EXTENDED PR. NO. ..., LABOR HOURS HOURLY EXTENDED VJ_U
'(C-x
\I'.':·,,,_ -t
V �-1
'O'"'l --
v,_-, •
w· ,_,., ..L
.
,.
On-,&.., . ._;·,✓.;
e.,, 11.,.,,,
M·- • I J
c;, ,,.. , --.,,, l
,
,
� _·- .. 1'.L. r,/.,,,,___ L
n .. .,. -
_tJVY\,.,.1"\. -
Jn
1.n ,_
in i-
, ...
t"'
TOTAL CONSTRUCTION EQUIPMENT COST
. ..
C
HAULING OF CONSTRUCTION EQUIPMENT
DESCRIPTION NO. UNIT UNIT COST
.
.
. . .
. . .
HAULING OF CONSTRUCTION EQUIPMENT D
AMOUNTS
.
. •'••
.
:
.
. .....
•
..
... ..
'
MATERIALS & EQUIPMENT AND/OR WORK DONE BY SPECIALIST
DESCRIPTION NO, UNIT UNIT COST
_ ... _ ---'-- • lLC:: ;s.A. ;t'/�. -·. J 1/. -N'fl.),.. '• ... '• • ... .
. .
••• . . ..
TOTAL MATERIALS & EQUIPMENT COST B j • ··.··
S!GNATVAE VERIFIES TIME, CLASStRCATION, MATERW.S & EOUlPMEt,IT, CONSTRUCTION EQUIPMENT, ANO HAULING OF CONSTRUCTION EQUIPMENT.
RATE
r�,;.·J .. � S..+I.'"- REG •
OT .
-Ue.c,1.,,..,- VO'f.ll<.r:.• REG ,
OT I ,c:.
I"�,.� a..-..� REG l2
OT 1.s
/"-1,."(lJ !.· ll I REG (2'
OT :l .';>
,,- f, - REG ,,. .
OT I ..,
REG .
OT
. REG .
OT
REG
OT
REG
OT
. REG
OT
SUBTOTAL
(RATE) X {SALARY + VACATION}
PAYROU.·TAXES & INSUAANCE
suasrSTENCE NO
SUSS!STENCE NO .
OTHER
TOTAL LABOR COST
. ..
,
•'•
�6NLABOR'COST' ..
(A)
% ON MATER JAL$ & EQUIPMENT COST (B)
,• % ot.fcoosTRIJCTION EOUIPMENT cosr ,<Ci
% ON HAl.n.JNG OF CONSTRUCTION EQH1P, (D)
�'� 1lq,(O
ECTOR DATE =a,moCi.'PE-O<NT
i- C.,-')_J DATE TOTAL THIS REPORT
DWR FlELD ENO!NEER DATE CONTRACTORS REPRESENTATIVE DATE DEW(�J 04·14
.
· .
AMOUNTS
.
..
.
'••,
. . ··
'.> ..
·. .
. , .
..
.
.
. ,,• •· .
,•
. ••
',, _-,'
( 1
I
I -
... ;t~-:;~i~!~§.{~~~t ~t:er~~~r~
1 t~~~~~f~l~ ~ffi --r~--~~1~1~. t{i-~it1ijf:~~)
: ~-~~,~;&;½~~~~~.
; M¼ 0 ~ J¥~~ ~~~~~~~i~~~~~!{~~ k{_ f _ ~~ ~-~~- :►~~ ~ 1 :-3~~f~: r .~~ . 11 ;-..:'•:.· • -~
• I
A
1 Day
Total $226.06
OUnited Rentals· PARTIAL RETURN
INVOICE
Q)
.µ
rl
C/l
.Q
BRANCH 641
925 NORTH BEN MADDOX WAY
VISALIA CA 93292-6620
559-627-5112
A-C ELECTRIC VISALIA BRANCH
1035 W MURRAY AVE
VISALIA CA 93291-4721
·JUL27 21m # 213602575-009
customer#
Invoice Date
Rental Out
Rental In
UR Job Loe
: 156339
: 07 /19/23
: 11/30 /22 03: 30 PM
: 07/19/23 11:11 AM
: 1035 W MURRAY AVE, V
: 430
ID:
~ Office: 661-410-0000 Cell: 559-679-7286
UR Job#
Customer Job
P.O. #
Requested By
Reserved By
Salesperson
: VR0337
: JOE MERCADO
: CLIFFGENESIS SALUDEZ
: BRYN WHITE
8.1.31111 MB0.558 20496S21.p01 405356 1-4 0
, .,1 ,h , ... 111111 1, ,1111111111111 ,, 'h, 1, 1111111 I111,11111,111111
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS:
____Q!:,y Equipment Description
- ·"- -~
1 10595346
1 907/0525
MINI EXCAVATOR 7400-9199#
Make: TAKEUCHI Model: TB240
Serial: 124002620 Meter out: 1435.80
MINI EXCAVATOR BUCKET 12"
Minimum
Meter in: 1713.80
Invoice Amount: $1, 130.31
Terms: Due Upon Receipt
Payment options: Contact our credit office 704-916-4877 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC.
P.O. BOX 051122
LOS ANGELES CA 90074-1122
Day Week 4 Week Amount
312.00 1,034.00 1,876.00 1,034.00
Rental Subtotal:
SALES/MISCELLANEOUS ITEMS:
__ _,.Q.::t..._y Item Price Unit of Measure
N/C
1,034.00
Extended Arnt.
1 CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES:
CONTACT: JOE MERCADO
CELL#: 559-556-5783
[DRSURCA/MCI]
Billing period: 7 Days From 7/12/23 03:30 PM Thru 7/19/23 11:11 AM
7.755 EACH
Sales/Misc Subtotal:
Agreement subtotal:
Tax:
Total:
7.76 7.76
1, 041. 76
88.55 1,130.31
Effective January l, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions.
NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. 1 Day
Total $127.69
8.1.31981 MB0.528 09240S21.p01 347651 2°3 0
OUnited Rentals· 4 WEEK BILLING
INVOICE
Q)
JJ
r-1
tll
,Q
~
BRANCH 641
925 NORTH BBN MADDOX WAY
VISALIA CA 93292-6620
559-627-5112
A-C ELECTRIC VISALIA BRANCH
1035 W MURRAY AVE
VISALIA CA 93291-4721
Office: 661-410-0000 Cell: 559-679-7286
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
# 213602575-008
CustQlller #
Invoice I>ate
Date Out
: 156339
: 06/29/23
Billed Through
OR Job Loe
: 11/30/22 03: 30 PM
: 07 /12/23 00: 00
: 1035 W MURRAY AVE, V
: 430 OR Job#
Customer Job
P.O. #
Requested By
Reserved By
Salesperson
ID:
: VR0337
: JOE MERCADO
: CLIFFGENESIS SALUDEZ
: BRYN WHITE
Invoice Amount: $2,553.88
Tarms: Dua Upon Receipt
Payment options: Contact our credit office 704-916--4877 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC.
P.O. BOX051122
LOS ANGELES CA 90074·1122
RENTAL ITEMS:
. -~ Equipment -==~~~!:!· ~-~~====:::::::===:::.:..---=::::....:-=:=::!"'~i~ca~i~m~=!!!!:::-...:....:. _____ Jn.....~L..::::::::::::::!!W~ee~l~c:=:=~4~We~e~k:::::-:===---Amount--- -_ --------Dernpt; loQR -= ~" =:
l 10949061 TRAILER TILT 12'-16' TO 9,999K TANDEM
Make: TOW MASTER Model: T-9DT 16'
Serial: 41<Nl3T2325l<Ll62613
l 10595346 MINI EXCAVATOR 7400-9199#
Make: TAKEUCHI Model: TB240
serial: 124002620 Meter out: 1435.80 Meter in: .00
l 907/0525 M!NI EXCAVATOR BUCKET 12"
SALES/M!SCELLANEOUS ITEMS:
_........,Q...=t .... Y Item
l CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES:
CONTACT: JOE MERCADO
CELL#: 559-556-5783
[DRSURCA/MCI]
58.71 312.00
Price
14.070
Billing period: 28 Days From 6/14/23 03:30 PM Thru 7/12/23 03:30 PM --
228.13 463.73
1,034.00 1,876.00
Rental Subtotal:
Unit of Measure
EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
Total:
I
- · ------·------- --
~
463.73
1,876.00
N/C
2,339.73
Extended Arnt.
I
14.07 14.07
2,353.80
200.08
2,553.88
_____ ·-,------
-
Effective January l, 2021 and where pe:rmitted by lew, United Rentals may impose a surcharge of l.8% for cradit card payments on charge accounts. Thia surcharge ia not greater than our merchant discount rete for credit card transactions and ia subject to sales tex in some jurisdictions.
NOTICB: Thia invoice is sul:lject to the te:rms and conditions of the Rental and Service Agreement, which are available et httpa://www.unitedrentela.com/legel/rental-aervice-tema•US and which are incorporated herein by reference. A COPY OF THB RENTAL AND SBRVICE AGREEMENT TERMS ARB AVAILABLE IN PAPER FORM UPON RBQUEST.
Page: l
CALTRANS ROW
CITY OF VISALIA DATE: 7/11/2023
VR0337 DWR DATE: 7/7/2023 SOS 7/6/23
AREA DWR NO.: 467
CONTRACTOR REPORT NO. Rpt 2
CR NO.: 63.03
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 MV707 DUMP TRUCK 3 YRD TRUON TRUN 2AXL 4 45.02 $ 0.81 0.21 180.08$ 2 MV653 F450 DIESEL, VHWY [TRUCK] T&TT 36-48 4 53.72 $ 0.87 0.15 214.88$ 3 S1706 SKIDSTEER, BOBCAT, EMSS HCESP BOBCAT CTERRA 4 43.69 $ 0.88 0.13 174.76$ 4 MV318 TRAILER (4 TIRE)18' WIRE, TRR TRAIL LB-A 100 4 15.01 $ 0.63 0.43 60.04$ 5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment 629.76$
15% Markup 94.46$
Total Equipment 724.22$
MATERIAL, SPECIALISTS, and RENTALS
Line
Invoice
Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 59918 KRC SAFETY 7/14/2023 1 $ 1,186.52 S $1,186.52 11 1 YARBS GRADING & PAVING 7/31/2023 1 $ 10,250.60 S $10,250.60 12 213602575-008 UNITED RENTALS 6/29/2023 1 $ 127.69 R $127.69 13 213602575-009 UNITED RENTALS 7/19/2023 1 $ 226.06 R $226.06 14 15
Subtotal Material, Subs, and Rentals 11,790.87$
15% Material Markup -$
10% Sub/Specialists Markup 1,143.71$
15% Eq Rental Markup 53.06$
TOTAL MATERIAL, SUBS, and RENTALS 12,987.64$
LABOR CHARGES
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount
100-JW JOURNEYMAN KEVIN L ANDRADE 44.23 $ 27.68 $ 0.11 4 66.35$ 28.34 $ 0.11 420.40$ 100-A7 A7-75% JOSE M MARTINEZ 33.36 $ 24.31 $ 0.11 4 50.04$ 36.47 $ 0.11 384.10$ 100-FMN FOREMAN ROBERTO ZAVALA 50.03 $ 27.85 $ 0.11 4 75.04$ 28.60 $ 0.11 460.16$ - $ - $ - $ - $ - $
- $ - $ - $ - $ - $
- $ - $ - $ - $ - $
Subtotal Labor 1,264.66$
35% Mark Up 442.63$
Total Labor 1,707.29$
SUBTOTAL 15,419.16$
Subcontractor Markup -$
15,419.16$
A-C Electric Company
CUSTOMER
REFERENCE
TOTAL COST THIS REPORT
A-C JOB NUMBER
CUSTOMER JOB #
DESCRIPTION Start of Shift 7/6/23 Coordinate with NV5, Coordinate with traffic control, Coordinate paving with YARBS, Load trench plates on to trailers, Clean up all cold patch, Refer to DWR.
Invoice Description
TRAFFIC CONTROL
APHALT PAVING
MINI EXCAVATOR W/TRAILER
MINI EXCAVATOR
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.03 July EWB - REV 250206 Printed 2/7/2025 I I
., V �
.. (
" ,:
IJ -e tkc.buc e
o-mp
an'f - CALIFORNIA C-10 LICENSE 99849
0 0
1),s; ,s_\. ENGINEER! NG-CONSTRUCTION-TECH NOLOGY-SERV! CE :t'_auC
DWRID#:467 Daily Work Report
� Draft D Approved D Rejected
VR0337 DOWNTOWN STREET LIGHTS V
*Job/WO Number *Job/WO Name *Div
DOWNTOWN VISALIA MAIN ST, CENTER AVE, ACEQUIA VISALIA, CA 93291 *Site/Location
CITY OF VISALIA
*Customer
"'Required
*Report Date
Cr63.01
CCO No,/Area
100 100 * QQuote .&M
*Local Reporting To PO# * Job Home Local
Roberto Zavala roberto.zavala@a-ce[ectrfc.com
•submitted
By *Submitted By Email
"'Work Completed?.Yes
Coordinate with NV5
Coord!MlO traffic control With KRC locaUon and tlme
Coordinate paving with YARBS locations and time
Coordinate material and equipment needed for task with AC shop crew 7-10-202312:10 AM
*Submitted Date/Time
*Previous Time Submitted?.Yes
Coordinate with AC field crew lime and location sequence in which to start removing plates from the following locations (25+00,22+69, 18+69, 16+15,15+13, 13+59,10+90) Load plates on trailers a maximum of 6-8 plates depending on the limits of the trancrs and size and weight of the plates {this task takes a minimum of 2 guys do to the size and weight of the plates} (one guys operates the heavy equlpment capable of lifting 1he plates. while the other uses s magnetic tag line to position the ptales accordingly and safely)
Ship the plates back to the yards staging area
Unload and brush off plates then stage them :appropriately (thfs task takes a minimum of 2 guys do tol he size and weight of the plates} (one guys operates the heavy equipment capable of lifting the plates, while tho other uses a magnetic tag line lo position tho plates accordlngly and safely) Coordinate wilh AC shop crew lo have all plates, materials, and equipment hauled off.
Go back threw all locations and load up all cold patch and debris left behind by work being preformed Call off traffic control
Images
Rl7/23 Page j 1
7-7-2023
1 -, ,·:-";, . ·-;-- --· ., . .. - ·-------.· , -- ... , ..... ,-.,·--- ,·· : . . . .. -·--- _. --. · ·• :·- -~·-··i ···oescription of Work : · . . ·_-. . • ·- . • . •. . -· • • •. _ . · • . · · : • . . . . • .. -- , .. '" . .... •.:. - . - .... --- - . ·.• .• . ,. --· -- . --· ---· . : - .. . .. ,._,___ . ,• ,\ Daily Work Report
DWR 10#:467
t81 Draft D Approved D Rejected
KEVIN L ANDRADE - ANDRKL l
JOSE M MARTINEZ - MART J6
ROBERTO ZAVALA-ZAVAR0
'
'''
'''.'
RJ7/23
' J 4 '
Al 4
F 4
'
'
' '
'' '
: '
i 4 -' - '
<..:\
4 -_
•<;o .. ' : .. ,'
io
• Cl
. :I _,
[\o -,. '
'
'' '
<:o _--.... _-!
--,-- I
=ir:·fi<I
)-\-
<+ >
\/)_-i:\
)}_-_--__
-
. _-.. • _,
--•--- -_
- -- -,
-
-.. i
·-:.:
--
:
-..
·-<---:<
--- ---._
--•.
-- . ·-:.:-•··- ·-I
.. ·.,
> <
-
'
: )i<
<
' --' : -._.? i' ': ...
--__ : ,, >_: ... -._
.
-: :
"'Required
'
'
Page I 2
Technician Dispatch lime I
I
End Time Class ST OT
I
I
I
I
OT Tr
I
I
I
·::rot.ii ::I Adders Verd .• .. ;-:•..; I
-----------------+-----~-ir-------+---+----+----+---+----1---:-,--,.,.+-----1~ - ----I I
I
I
I
1 . ••
!
l
I I.· · · ·.
I I ·:.-:. I
---------
J
... .. .
. I
I
. I
i ·. :_·· . l
I I
-------------------i-------+------+--·---+----+----+-- - -+----1---- --------- 1 I l .. 1 l
l
I
I
I
I
i
I
I
•. •
··•.·
.. :. •
I
-------- ------- ---+;- --------t------- -1-,----1,--- - 4-,,----4----11-----11--~ . . +-----,,,..----- 1 l ..... ,
l I
I
l
I
I ., .
I
I
I I
:.:, I
.::;· !
I ••• . ;
:.· I
,:,
. .. .. .
l
I
I
Daily Work Report
DWR ID#:436
181 Draft D Approved D Rejected
I -- ----··--·- ---·---- . .
• Materials:
�·�-.. . . --
:,
- .. - ·-· -.. -- --·· --1
. . .
Qty Material
I
I
..
• Approved By Signature
Customer Representative
James grler
*Approved By Full Name
Vendor/
Truck Stock
I
I
I
I
I
I
I
I
D Add additional employee page.
Rl7/23
I
Packing Slip #
I
I
I
I
I
I
I
I
I
.
I
A·C Owned/ H I A-C Equip. # /
Rental ours I Rental Agency
Renwl 10 :111n29s
Rental 10 10949061
Rental 10 10595346
A.COwned 10 Mv101
I
A.C Owned 10 iMv653
I
A-COwned 10 ls11os
A-COWned
Ticket II
Ta krc
Ta fCC
I
I
•completed By Signature
Field Representative
Roberto Zavala
•completed By Full Name
•Required
Miles I Description I
Minl11x
I
lrraner
I
lex
iSldd steer
I
!Traffic control
I
lPavins
I
I
Page f 3
-
'
I
1 ump truck
iHJghway truck
I
;
Subcontract - Direct Job Items
I
Please see cost break down on next page
' 7\1.
·11 },
A\" •• 1-l
I \
TRAFFIC CONTROL~ SAFETY SUPPLIES ~ EQUIP11ENT RENT AL ~ TRAFFIC DESIGN Invoice
SAFETY co_.,. INC .
P.O. Box 6356 Visalia, CA 93290
Pb# 559-732-0393 Fa,-# 559-732-2684
Bill To
Date
7/14/2023
Job Info:
AC ELECTRJC
P.O. BOX 81977
BAKERSFIELD, CA 93380-1977
9-22-01/CITY OF VISALIA DOWNTOWN ST LIGHT
VISALIA
VR0337
P.O. No. Terms Due Date Ordered By:
VR0337 Net 30 8/13/2023
Date Item Description Quantity Rate
07/03/2023 2 man 001 2 man lane closures - 1-8 hour shift 07/05/2023 2 man 001 2 man lane closures - 1-8 hour shift 07/05/2023 Overtime Overtime - Per hour (8-12 hours)
07/05/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) 07/06/2023 2 man 001 2 man lane closures - 1-8 hour shift 07/06/2023 Overtime Overtime - Per hour (8-12 hours)
07/06/2023 Arrowboard - A ... Additional arrow board(s) per shift (includes lane) •-*"'** Please note, per the agreed upon quote, rates
have increased by 2% as of July I st, 2023
*"'**••········
JNOEMNJTV AGREEMENT. AJI lt~ms: covef"'cd by thi~ 0ocume:ntsh:oll be: .t1tt:hc :;olc rl,:k of! the Cuiston'\,cr. Cu~t:O"'Y'let" ~i::::..-or.:,e~ to defend., lr,,dcmn•fy ond hold hot"'mlo~s. KRC SA.fSt::Tv CO ... IU OfflC:<:,""#,,. d•re:c:tor-:: and .crnpfoYee,i;~ fr'"Om and as;n,nir;t any and all l~:abihty c:l-.in'\t:,.Juds:rn,.,-nt"Go., co:ss::t:s., attorney 1',ee'$., or dcrnond:,: of htl £btlon or1~ns:'frorn the u-,s.,e. rnolnt:cnenc:c .. OPl!!:1"'~tlon, or-- po:s,c,:s• on of 'the eQu~prncnt Jndvdtna: but: not hrnttll!!d ,;.o., tho.,:c o..-•~na::f'1"'on-. the :c.ct:lvc nc::elts.,::nc,e, of K'.RC s.AICTV CO.,. Its offic-e.-s .. d&..-e:c:t:o~ •"d Cr"l"IOIOyec~ .. from !nJury to or death 01' 1:h,e C\,,~to~e..-,. Cu~tomcr"~ ernpl0y,eei:;.,. or any other pc-rson,. or from d~rn:inoi:;ifl" to •ny Of"'OPcr"'Cy~ -S•v.- end cxceptt.h4:'"re shall b-ci- no obl~o,:t.lon on~., i:::>•r't of the: Cu:st:o mil":r to d c:fc:nd .. I ndcmnJfy ~nd hold hon-nl c:::SJs KRC s.,ttr,,.FITV CO ... It::,; off( ccn;., dlrc:ctor:.9,. ttnd Cr"\"!IOIOyc:c:,,. if the l1abU1t:y., cl~rn,:: .. J-.,d£:rt>cl"'lt!:o.., CO-St:$ atto....ncy,s fc-e!:i.,. or d~mond::; of h,::1s:;:,,1;lon o'th-c""""'IS"c:
:i;::1vin1: r1s« 'f:O ':1-uch oblls:;a,t:•on ar11:.,e, from 'th,e, col~ n•:cl1 Cotl"'l,;,a or--wtllf'vl ~ls,eonduc:t:: of KRC SA.I" r:Tv CO.,. it:::. offlc:cN,. dlr,c:cto~ .. nnd ,employ,c,,t::$-. Sf C.Usto'l""ncr refuse'$ to d~fcnd, lndernntfy end hold h~rrnlc.s:s KRC SAl'IE!TV CO . ., lt:s offlC"l:"N.,. dirc:c:tors,. and ,cmplo-y,c,c~ ond :su~CQuen'dy .a dctcr-mlnnt:t on t:i;: mode th~t
11.abOlty 1$. not: due- to 1:;h~ ~ol~ nce,h~enc:c or WIiifui rnt$.Conduc1:: of KRC '$.APCTV -CO.,. IU off♦ c:crr.,. d1-roec:"t.:o~~ and el"YIPIOyecs.., Cus.tom-e,r ts obl1:;at::ot:d 1:0 r~1mbv~,,:r Or'ly :;,ind .ti h-nb-h1-y,. clalrns:.,Jud:s:;rne:nt:"&,. co'l!C"t:;.
Gttorncy~ -'f<¢,. or d,cm~nds o-1 ll~£O~on tncu,.,.cd by KAC ~FAETV CO.,. it'S offlccrs,. dlr,ec:t:or-:s .. -"r"'ld ,crnploy~cs. Cu,:,.ton"H!:I"" as:;:r1:cs to no't:tfy KRC ~fTV CO.,. 1m..-ncd1t11t:cly ln ~c of :ony acct dent ond to obtal nth-=- nanue:~ ... ,e,ddl"'c-:i..~czs,. t:cfcphonc nu mbcu"':S: and ot:h~r pc:n:;1 n,en-c I r"tfOl"'l"'nJ:31't:lon f,,.-o,-.n &tl ~r"U<CS lnvolv,cd and .nil ~tn"="s:£,e,fi;.
l 1,586.61
l 1.586.61
8 115.00
2 75.00
l 1,586.61
4 115.00
I 75.00
Sales Tax (8.5%)
Total
Payments/Credits
Balance Due
Invoice#
59918
Amount
1,586.61
1,586.61
920.00
150.00
1,586.61
460.00
75.00 $0.00
$6.364.83
$0.00
$6,364.83
Contract Hrs CT ROW EW HRS Supervision HRS
-2.00
2.00 2.00
-2.00
2.00 2.00
-2.00
2.00 2.00
2.00 4.00
4.00 2.00
5.00 -1.50
1.50 1.50
-1.50
1.50 1.50
-1.50
1.50 1.50
1.00 4.00
6.50 6.50
6.50 4.00
4.00 26.50 31.50 2.00
Hours % worked 46% 54%
7/14/2023 KRC INVOICE 59918
7/6/2023 2-man lane closer 1-8 hour shift 1,586.61$ 724.92$ 861.69$ Split per % worked 7/6/2023 Overtime (8-12 hours) 460.00$ 210.17$ 249.83$ Split per % worked 7/6/2023 Arrow Board 75.00$ 75.00$ Arrow Boards on CT ROW EW only 935.09$ 1,186.52$
CR63.03 Rpt 2, Amount 1,186.52$
A-C ELECTRIC COMPANY
Job Cost History Report From 07/07/23 To 07/07/23
UnPosted? Including Payroll and A/P Invoices in Progress Tran
TypeDate Reference Description Additional Information
-2.00
07/07/23 PR AVENAA ANDRES A AVENDANO Check# F45026 2.00 Hours
Job: VR0337 DOWNTOWN STREET LIGHTS
Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR
07/07/23 PR AVENAA ANDRES A AVENDANO Check# 123398
07/07/23 PR CHAVAM ANTHONY M CHAVEZ Check# 123399 -2.00
2.0007/07/23 PR AVENAA ANDRES A AVENDANO Check# F45026
07/07/23 PR CHAVAM ANTHONY M CHAVEZ Check# F44885 2.00
2.0007/07/23 PR CHAVAM ANTHONY M CHAVEZ Check# F44885
07/07/23 PR LYONMR MARK R LYONS Check# F45051 2.00
-2.0007/07/23 PR LYONMR MARK R LYONS Check# 123400
Subtotal for Phase: 0001-1080 DEMO SL POLES Cost Type: L LABOR 6.00 Phase: 0002-1126 UNDERGROUND CONDUIT Cost Type: L LABOR
2.0007/07/23 PR LYONMR MARK R LYONS Check# F45051
07/07/23 PR ANDRKL KEVIN L ANDRADE Check# F45022 4.00
2.0007/07/23 PR ANDRKL KEVIN L ANDRADE Check# F45022
07/07/23 PR MARTJ6 JOSE M MARTINEZ Check# F44921 2.00
4.0007/07/23 PR MARTJ6 JOSE M MARTINEZ Check# F44921
Subtotal for Phase: 0002-1126 UNDERGROUND CONDUIT Cost Type: L LABOR 17.00 Phase: 0003-1800 SL POLES Cost Type: L LABOR
5.0007/07/23 PR ZAVAR0 ROBERTO ZAVALA Check# F45080
07/07/23 PR AVENAA ANDRES A AVENDANO Check# F45026 1.50 -1.5007/07/23 PR AVENAA ANDRES A AVENDANO Check# 123398 07/07/23 PR CHAVAM ANTHONY M CHAVEZ Check# 123399 -1.50
1.5007/07/23 PR AVENAA ANDRES A AVENDANO Check# F45026
07/07/23 PR CHAVAM ANTHONY M CHAVEZ Check# F44885 1.50
07/07/23 PR CHAVAM ANTHONY M CHAVEZ Check# F44885
07/07/23 PR LYONMR MARK R LYONS Check# F45051 1.50
07/07/23 PR LYONMR MARK R LYONS Check# 123400
07/07/23 PR ZAVAR0 ROBERTO ZAVALA Check# F45080 1.00
07/07/23 PR LYONMR MARK R LYONS Check# F45051
4.0007/07/23 PR ANDRKL KEVIN L ANDRADE Check# F45022
Job: VR0337 DOWNTOWN STREET LIGHTS
Subtotal for Phase: 0003-1800 SL POLES Cost Type: L LABOR Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR
Check# 123400 6.50
07/07/23 PR CHAVAM ANTHONY M CHAVEZ Check# 123399
07/07/23 PR AVENAA ANDRES A AVENDANO Check# 123398 6.50
5.50 1.50
-1.50
1.50 31.50
4.00 6.50
Printed by SMF as of 01/24/25 2:25PM
Subtotal for Phase: 0091-1012 T&M EXTRA WORK Cost Type: L LABOR 07/07/23 PR ZAVAR0 ROBERTO ZAVALA Check# F45080 4.00
07/07/23 PR MARTJ6 JOSE M MARTINEZ Check# F44921
07/07/23 PR LYONMR MARK R LYONS
DAILY EXTRA WORK REPORT
COtHRACT 1/0.
SPECIFICATION NO.
WORK PERFORMED SY Yarbs Grading and Paving, Inc,
DESCRIPT!ot/ OF WORK Patch Paving for AC Electric on 7-6
EQUIP, NO, CONSTRUCTION EQUIPMENT
�� �!ioi-5. �- ,s:;;l'(,t-£,t,,tr ;;.,.,-'8w.-... ·
LiQht Tower 4
,--\,,,!f��ill��,��;
Bobcat 4
-■ 7 ; ta�li:��- t•���jiJ+lt
Jumping Jack 4
TOTAL COUSTRUCTIO
HAULING OF CONST
DESCRIPT!otl
DATE PERFORMED
DATE OF REPORT
DWR INSPECTOR DATE C01ITAACTOR'S FORHWI/SUPERHITH/OENT
DWR f!ELD EIJG!NEER DATe CONTRACTOR'S REPRESHiTATIVE
6-Jul-2023
31-Jul-2023
LABOR
SUBSISTENCE
OTHER
HOURS
OT
OT
OT
(RATC} X
HOURLY EXTENDED
RATE AMOUNTS
�?:Sffei?{J��tiff:�1-�
15,00% % ON MATERIALS & EQUIPMENT COST
�'.,�Y:�WR�:�§i�itr�£::L: ;J��c::�ir�t:tZ�!?t§i�
------
DATE
% ON HAULir/G OF COt/STfWCTIOll EQUIP. (D)
TOTAL THIS REPORT
Ori9fnal: Project Head,quarte11,
Copy; Contractor
$10,250.60
DWR 2832 (Rev. 4/98) For instructions; see reverse side. Copy; S[GNATURE VERIFIES TIME, CLASSJFICATIOll, MATERIALS & EQUJPMElfT, COIISTRUCTIOIJ EQUirMEUT, AND KAUL!llG OF COf.STRUCTJON EQUIPl-1H/T, DATE
Inspector
CONTRACT NO. _/n_�_&,-_���=2:'.'ft:;�/,�C-
1 _____ _
DAILY EXTRA WORK REPORT
YARBS DATE PERFORMED �7�""�7F-;..-�:J.�J�_"\J�1 ..... r:,,_h�1"-f'_k�. 7€(2 1 grading, pavingSPECIFICATION NO. __________ _ WORK PERFORMED BY_...,�<4,,c,.,'=�/,..,!',,,_�G�vi:i=d=�--- DATE OF REPORT License #964071 DESCRIPTION OF WORK�t<�C1.,.,t""f<c.,__&,_,,,i.,,.9,,_,t>..,u+"-'-_5.__ __ ,z:l-��la=c=v:;,��®=d��t=e,,v+�--=°'�v=\,,,V���,./.�a�.....,�n��V�1 .>u1. /� EQUIP. NO.
'y I...IJ
'
l.\j,.,...,.,
CONSTRUCTION EQUIPMENT
,rz., f { ,._,,.
_.; 'I� I -o·_.....,
....-'7/C1\-, r. -
I . ·A-:1.:�-- •'/• •. 'I
p,,_fc. ....v t:)
' f,(.•'(j•,olv'"·�' ',
·1 - ..... ...,,,_ • .....-ye,, d-k"
HOURS
.
I
'
..
TOTAL CONSTAUCllON EQUIPMENT COST
RATE
C
HAULING OF CONSTRUCTION EQUIPMENT
DESCAJPT10N NO, UNIT UNIT COST
HAULING OF CONSTRUCTION EQUIPMENT D I
MATERIALS & EQUIPMENT AND/OR WORK DONE BY SPECIALIST
DESCRJPT10N
'Tl."' le,; . ';,
'
,, '
' '
'
NO. UNIT
.... r;_ {
_; ,'
'
TOTAL 11tATER1ALS & EQUIPMENT COST
UNIT COST
!i
'
,'
''
B
EXTENDED
AMOUNTS
SIG-NATURE VEfl!flES TIME, ClASS!FlCATION, MATERW..S & EOUIPMENT, CONSffiUCTION EQUIPMENT, ANO HAULING OF :ONSTRUCTION E002 DVg� 7-?,�� roST�E>W#SUP<roNTENO<NT
OWR FIELD ENGINEER DATE CONTRACTORS REPRESENTATIVE
DEW(®> 04-14
P.R. NO. LABOR
,
PAVROU TAXESS'INSUAANCE
SUBSISTENCE
SUBSISlENCE
OTHER
, " " % ON LABOR COST
NO
HOURS HOURLY
RATE
REG lT
OT
REG u.
OT
REG '1'
OT
REG ...
OT
REG q... '
OT
REG '
OT
REG '
OT
REG
OT
REG
OT
REG
OT
SUBTOTAL
(RATE) X {SALARY+ VACATION)
TOTAL LABOR COST A
'½ ON t,'ATER!ALS & EQUJPMENT COST
(A)
(8)
(C)
(0)
-----,. 00 coNSTR\'9'TION EOUWME1f{ie()$T
% OtJ HAUUNG OF CONSTRUCTION EQUlP.
DVTE TOTAL THIS REPORT
DATE
EXTENDED
AMOUNTS
( )
~~ j! ~~ ~"" ~-~ ~~ ~ ; :~ (ib~Jlll( ~;f~ \~~ "'."""~A/I!§' "Ci(, . 'jj /i!i![,i! ,\.iii® ~ ~'\,1/iffl!'~ ~<~~1m.fc;j}s~
NO
DAILY EXTRA WORK REPORT
CONTRACT NO. NV 5 -'--'--'-=------------
SPECIFICATION NO. ____ �-------
WORK PERFORMED BY-+
;li�0-�v�l��U�JY�a�d�!4-=+--
DATE PERFORMED 7-7-J.. '") ..,v{Jj._ 0 F: +-J.r..
DATE OF REPORT ____________ _
DESCRIPTION OF WORK _f1
f'-"'>0,,-"--<::.�_al,,_,_,,....,91'-!')>-""'"''..c.ffi.,_,_ _ _,cc"1wl __ l_,,c'--'v---'"-"-*"--�"'""-'-'fl"'cl�--'(!_""4-tcl"""'-'-. ---"-'.Di.,,lM/cc=.-'-'1±.L-"UWc=.c. 16A�!�RI}
License #964071
l,h,,._ /t�
EQUIP. NO. CONSTRUCTION EQUIPMENT HOURS RATE EXTENDED P.R. NO. LABOR HOURS HOURLY EXTENDED
AMOUNTS
·v.- -lJ ' ,,�·e,;;. . . • u;,, . ....
... a. .. t,y,-- [.,
,, .;.;..,J" ·. . ,. 1,
_'l, ,/ nl - · J - •
a .. ,,.� ,. _,, . .L. j '
Y. ,_7 , U.:k. v= ,.,
�IJ;�"'-'" ·""-'tAe:'- i.l
r., �
.
.
DWRINSP
D'Nfl FJELD ENG1NEER
TOTAL CONSTRUCTION EQUIPMENT COST C
HAULING OF CONSTRUCTION EQUIPMENT
DESCRIPTION
.. .... ..
.
<-···· .. _:.:
..
..
NO.UNIT
. .
.
UNIT COST
. .. ..
'
I
.. '
'
'. .. .. . ..
HAULJNG OF CONSTRUCTION EQUIPMENT 0 '
MATERIALS & EQUIPMENT AND/OR WORK DONE BY SPECIALIST
DESCAlPTION NO. UNIT UNIT COST
· . . . '"- .·-' ,' '• , _·_-:: '·✓1,, '_J, - c,.
.
•
• • A<✓, .. ···':$ '>�•�--
.. ' / .• .
. .. ··-· ... . .
TOTAL MATERIALS & EQUIPMENT COST B . •·
S-!GNATlJRE \IERJFlES m..te, ClASS,IFICAllON, IMTEAWS a EOUlPME.NT, ..
. . .. •
.
�N'e,QU1PM£tfl ANOHAUUNGOFCONSTAUC�
7 - 7_
DATE CONTRACT fO.REM#l/SUf>EfUNTENDENT
DATE CONTRACTORS R.E.f'RESENTATNE
RATE
{'_1.,,._,,r/t,,,, � L REG 7
OT
. V,rl� REG
OT
J''LJ:.c.. . .,..,,,,, u ....... REG ..;,
OT .. 1€11,_(\ ... ,:. �- -1 • REG q-
OT
• l,t,¢ �, � REG tW
OT
REG .
OT
REG
OT
REG
OT
REG
OT
-'.· REG
OT
SUBTOTAL
(RATE) X (SALAAY + VACATJO.'I!)
PAYROU.:rAXES l. INSURANCE
SUBSISTENCE NO
SUBSISTENCE. NO
OTHER
TOTAL LABOR COST A
··,.;·otH.A.60RCOSl '..: ("-)
¼ ON MATERIALS & EQUIPMENT COST (BJ
%·0� CON_STRUC11QN EOUIPMENTCOST {CJ
;;}_�
¼ ON HAULING Of CONSTTIUCTION EOUlP. (OJ
TOTAL THIS REPORT DATE
DATE
.
AMOUNTS
,.
.
I .· .• •• '.-·
,> .. · .•.
'"·-,•,,:. .
..
..
···:.
. · ..
;\.'
.f l
> , "f} ffe~ -~~ :~.:~ --.~~ ~~- j, • z~---mt~*;;~~t~~ 3/tlf-;~t 'bWfi'f~~ ~w:~~o/ti!f:~: ri}-JV~Y?irclk~!f?# •• Z./1 I .
tj r•J, .;_!,~ ~ i -~.,£!~~-:,; .• 1/-=: ~~r~~~~~ -~ --~~4~ \~{~';¥~~ ¼.~~f1Jii;(i1t~}f~ . ~~~~~~:~~
DEW~ 04-14
ASPRitT
ACCOUNT NO.
SOLD TO
5992
Yarbs Grading and Paving Inc.
P.O. Box 87
Fowler, CA 93625 US
Porterville Asphalt
14200 Road 284
Porterville CA 93257
[email protected]
[email protected]
--------Mate ri a 1--------
Ticket
83050
83051
Invoice Total
Date
07/5/23
07/5/23
PO Product
Visalia Streetligh 3/4 HMA TYPE NB PG 64-10
Visalia Streetligh 3/4 HMA TYPE NB PG 64-10
Qty Rate Amount
24.94 85.00 2,119.90
25.14 85.00 2,136.90
50,08 4,256.80
Total Invoice-···>
A FINANCE CHARGE of 1-1/2¾, which is 18¾ PER ANNUM will be added to past due accounts. Debtor agrees to pay legal fees, court costs for co!lection or delinquent accounts and legal rate of Interest for past due accounts
INVOICE
PAGE
10396
DATE 7/5/2023
TERMS Net 30 Days
········F re ig h I••······
Fee Tax
Rate Amount Amount Amount
0.00 0.00 0.00 164.29
0.00 0.00 0.00 165.61
0,00 329.90
4,586,70
Total
2,284.19
2,302.51
4,586.70
ACCOUNT NO.
SOLD TO
Ticket
5992
Yarbs Grading and Paving Inc.
P.O. Box 87
Fowler, CA 93625 US
Date PO Product
POF0705 07/5/23 Visalia Streetligh Plant Opening Fee
Invoice Total
Porterville Asphalt
14200 Road 284
Porterville CA 93257
[email protected]
[email protected]
-------Ma teria 1-------
Qty Rate Amount
1.00 1,500.00 1,500.00
1.00 1,500.00
Total Invoice •····>
A FINANCE CHARGE of 1-1(2%, which ls 18'/4 PER ANNUM wiD be added to past due accounts. Debtor agrees to pay legal fees, court costs for collection or delinquent accounts and legal rate of interest for past due accounts
INVOICE
PAGE
DATE
TERMS
--------Freight--------
Rate Amount
0.00 0.00
0.00 1,500.00
10397
7/5/2023
Net 30 Days
Fee Tax
Amount Amount Total
0.00 0.00 1,500.00
0.00 1,500.00
ASPHAL't·
PDF.js viewer https://west.exch090.serverdata.net/owa/service.svc/s/GetFileAttachment?id�AAMkADB.
I of I
ACCOUNT NO.
SOLD TO
Ticket
5992
Yarbs Grading and Paving Inc.
P.O. Box 87
Fowler, CA 93625 US
Date PO Product
POF0700 07/6123 Visalia Streetligh Plant Opening Fee
Invoice Total
Porterville Asphalt
14200 Road 284
Porterville CA 93257
Yarbs Grading and Paving, Inc
[email protected]
--------Material--•···-·
Qty Rate Amount
1.00 1,500.00 1,500.00
1.00 1,500.00
Total Invoice •····>
A FINANCE CHARGE of 1-1/2%, which 1s 18¼ PER ANNUM will be added to past due accounts, Debtor agrees to pay legal fees, court costs for collecti-on or delinquent accounts and legal rate of interest for past due accounts
INVOICE
PAGE
10399
DATE 7/6/2023
TERMS Net 30 Days
-·······Freight-•••···· Fee Tax
Rate Amount Amount Amount
0.00 0.00 0.00 0.00
0.00 0.00
1,500.00
Total
1,500.00
1,500.00
7/10/2023. 12:34 pt;
·-RTERVILLE
~HAl,T
PDF.js viewer https://west.exch090.serverdata.netiowa/service.svc/s/GetFileAttachment?id�AAMkADB ..
I of I
ACCOUNT NO.
SOLD TO
5992
Yarbs Grading and Paving Inc.
P.O. Box 87
Fowler, CA 93625 US
Porterville Asphalt
14200 Road 284
Porterville CA 93257
Yarbs Grading and Paving, Inc
[email protected]
--------Materia(-.......
Ticket
83052
83053
Invoice Total
Date
07/6/23
07/6/23
PO Product
Visalia SlreeUigh 3/4 HMA TYPE A/8 PG 64-10
Visalia Slreelligh 3/4 HMA TYPE A/8 PG 64-10
Qty Rate Amount
25.00 85.00 2,125.00
25.10 85.00 2,133.50
50.10 4,258.50
Total Invoice•····>
A FINANCE CHARGE of 1-1/2%, which is 18"/• PER ANNUM will be added to past due accounts. Deb-tor agrees to pay legal fees, court costs fOf coHection or delinquent accounts and legal rate of Interest for past due accounts
INVOICE
PAGE
DATE
TERMS
········Frei g h I••······
Rate Amount
0.00 0.00
0.00 0.00
0.00 4,588.54
10398
7/6/2023
Net 30 Days
Fee Tax
Amount Amount Total
0.00 164.69 2,289.69
0.00 165.35 2,298.85
330.04 4,588.54
7/10/2021. 12:14 Plv
Date: 07/31/2023
Time: 09:36:44 AM
YARBS GRADING & PAVING, INC.
P .0. BOX 87
FOWLER CA 93625
*** CERT IFIED PA Y ROLL ***
DOl'INTOI\N VISALIA STREETLIGHT & PAVING Job#: Y22-06
Payroll #: __
License #: 964071
Report Code: 48.86A
Page: 1
Period End: 07/09/2023
================================================================================================================================ ------------HOURS \\ORKED EACH DAY------------
JOB CLASSIFICATION
EMPLOYEE DATA
MJN TUE WED THU FRI SAT SUN TOTAL BASE FRINGE TOT HOURLY --TOTAL JOB PAY-- 03 04 05 06 07 08 09 HOURS RATE + RATE = RATE BASE/OTH FRINGE ============================================================================================================================== ASHPALT RAKER/LABR REG: 0.00 0.00
OVT: 0.00 0.00
RONNIE J. ANDERSON
3481 BUCKINGHAM AVENUE
CLOVIS CA 93619
563-73-8643 S/0 Male
0.00 8.00 8.00 0.00 0.00
0.00 2.50 1.00 0.00 0.00
--TOTAL PAY THIS JOB--
Base Hourly Pay 896.38
fringe Paid to Plans 493.55
16.00 42.450 25.310 67.760 679.20 404.96
3.50 62.051 25.311 87.362 217. 18 88.59 -----TAX DEDUCTIONS----- ----OTHER DEDUCTJONS---- Federal W/Hold 91.22
FICA 55.58 Vacation/Holidy 63.38
Medicare 13.00
State W/Hold 24.31
Avg Hour Rate 71.279 State SDI/Local 8.07 ----------JOB FRINGE BENEFIT SUMMARY---------- ---------------------------------TOTAL PAY ALL JOBS-------------------------------- ADMIN p 1.95 ANNU!Tp 86. 19 APPRENp 9.75 Gross Pay: 896.38 Less Deductions: 255.56 = Net Pay: 640.82 Check# 2180 HEALTHp 196.95 INDUSTp 4.49 PENSN p 194.22
GROUP 4 OPERATOR REG: 0.00 0.00
OVT: 0.00 0.00
JOSEPH E . • HALLMARK
4344 E. CLINTON
FRESNO CA 93703
456-82-3354 S/0 Male Hispanic
0.00 0.00
8.00 8.00 0.00 0.00
1.50 0.00 0.00 0.00 --TOTAL PAY THIS JOB--
Base Hourly Pay 1219.38
Fringe Paid to Plans 472.00
16.00 67.060 26.970 94.030 1072.96 431.52
1.50 97.613 26.987 124.600 146.42 40.48 -----TAX DEDUCTIONS----- -- --OTHER DEDUCTJONS---- Federal W/Hold 155.81
FICA 75.60 Vacation/Holidy 104.30
Medicare 17.68
State W/Hold 48.06
Avg Hour Rate 96.650 State SDI/Local 10.97
----------JOB FRINGE BENEFIT SUMMARY---------- ---------------------------------TOTAL PAY ALL JOBS-------------------------------- ADMIN p 6.13 AFFACTp 21.18 ANNU!Tp 17.50 Gross Pay: 1219.38 Less Deductions: 412.42 = Net Pay: 806.96 Check# 2189 HEALTHp 189.70 INDUSTp 1.05 IUOEfDp 0.88
MKTAREp 1.93 PENSN p 188.65 RETWELp 44.45
VACFEEp 0.53
ASHPALT RAKER/LABR REG: 0.00 0.00 0.00
OVT: 0.00 0.00 0.00
CESAR L. R !OS
1319 N. DIVISADERO
VISALIA CA 93291
619-22-8625 M/0 Male Hispanic
8.00 8.00 0.00 0.00
1.50 0.00 0.00 0.00
--TOTAL PAY THIS JOB--
Base Hourly Pay 790.53
Fringe Paid to Plans 442.93
16.00 43.450 25.310 68.760 695.10 404.96
1.50 63.553 25.313 88.866 95.33 37.97 -----TAX DEDUCTIONS----- - ---OTHER DEDUCTIONS---- Federal W/Hold 52.25
FICA 49.01 Vacation/Holidy 56.88
Medicare 11.46
State W/Hold 10.92
Avg Hour Rate 70.483 State SDI/Local 7. 12 ----------JOB FRINGE BENEFIT SUMMARY---------- ---------------------------------TOTAL PAY ALL JOBS-------------------------------- ADMIN p 1.75 ANNU!Tp 77.35 APPRENp 8.75 Gross Pay: 790.53 Less Deductions: 187.64 = Net Pay: 602.89 Check# 2205 HEALTHp 176.75 INDUSTp 4.03 PENSN p 174.30
Date: 07/31/2023
Time: 09:36:44 ,AM
YARBS GRADING & PAVING, INC.
P.O. BOX 87
FOWLER CA 93625
JOB CLASSIFICATION
EMPLOYEE DATA
*** CERT If IE D PA Y ROLL ***
001\NTOI\N VISALIA STREETLIGHT & PAVING Job#: Y22-06
------------HOURS \\IJRKED EACH DAY------------
Payroll #: __
License #: 964071
Report Code: 48.86A
Page: 2
Period End: 07/09/2023
f/ON TUE WED THU FRI SAT SUN TOTAL BASE FRINGE TOT HOURLY --TOTAL JOB PAY-- 03 04 05 06 07 08 09 HOURS RATE + RATE = RATE BASE/OTH FRINGE ================================================================================================================================= GROUP 1 OPERATOR REG:
OVT:
CARLOS SANCHEZ GALLARDO
3050 JOY STREET
SELMA CA 93662
602-06-7232 M/1 Male
0.00 0.00
0.00 0.00
Hispanic
0.00 8.00 8.00 0.00 0.00
0.00 3.00 3.00 0.00 0.00 --TOTAL PAY THIS JOB--
Base Hourly Pay 1782.40
fringe Paid to Plans 593.34
16.00 72.010 26.970 98.980 1152.16 431.52
6.00 105.040 26.970 132.010 630.24 161.82 -----TAX DEDUCTIONS----- ----OTHER DEDUCTIONS---- federal W/Hold 248.20
FICA 143.58 Vacation/Holidy 178.80
Medicare 33.58
State W/Hold 91. 14
Avg Hour Rate 107.988 State SDI/Local 20.84 ----------JOB FRINGE BENEFIT SLMvlARY---------- ---------------------------------TOTAL PAY ALL JOBS-------------------------------- ADMIN p 7.70 AffACTp 26.62 ANNU!Tp 22.00 Gross Pay: 2315.84 Less Deductions: 716.14 = Net Pay: 1599.70 Check# 2207 HEALTHp 238.48 INDUSTp 1.32 IUOEFDp 1.10
MKTAREp 2.42 PENSN p 237. 16 RETWELp 55.88
VACFEEp 0.66
ASHPALT RAKER/LABR REG: 0.00 0.00 0.00
OVT: 0.00 0.00 0.00
HECTOR A. VALLES
P .0. BOX 453
8.00 8.00 0.00 0.00
1.50 0.00 0.00 0.00 --TOTAL PAY THIS JOB--
Base Hourly Pay 790.53
16.00 43.450 25.310 68.760 695.20 404.96
1.50 63.553 25.313 88.866 95.33 37.97 -----TAX DEDUCTIONS----- ----OTHER DEDUCTIONS---- federal W/Hold 34.05 Vacation/Holidy 56.88
GOSHEN CA 93227
550-47-4777 M/2 Male
fringe Paid to Plans 442.93 FICA 49.01
Hispanic Medicare 11.46
State W/Hold 2.79
Avg Hour Rate 70.483 State SDI/Local 7. 12----------JOB FRINGE BENEFIT SLMvlARY---------- ---------------------------------TOTAL PAY ALL JOBS-------------------------------- ADMIN p 1.75 ANNUITp 77.35 APPRENp 8.75 Gross Pay: 790.53 Less Deductions: 161.31 = Net Pay: 629.22 Check# 7711 HEALTHp 176.75 INDUSTp 4.03 PENSN p 174.30
JOB TOTALS f/ON TUE WED THU
03 04 05 06
REG: 0.00 0.00 0.00 40.00
OVT: 0.00 0.00 0.00 10.00
FRI SAT SUN
07 08 09
40.00 0.00 0.00
4.00 0.00 0.00
Totals:
TOTAL
HOURS
80.00 14.00
94.00 --TOTAL JOB PAY--
BASE/OTH FRINGE
4294. 72 2077.92
1184.50 366.83 --------- ---------
5479.22 2444. 75
FRESNO (559) 275-1998
Certified W.B.E.
NAME OF UNDERLYING CARRIER
SHIPPER
RATE
PRECISE POINT OF ORIGIN
. ' " ' <-' !
Kind Weight
Of Material Tag Number
'
' .
lo.is-�
Starting Time Deductions
Meal-Breakdown
i
CHECK ONE: Off HWY Q
W.T.B. IHC.
7093 W. Belmont Ave.
Fresno, CA 93723
CA#493677
CA. NUf\1BER
CONSIGNEE
CHARGES ASSESSED
AXLES:
?7
TYPE LOADING
OVER 56' 0 POWER O BUNKER Q
PRECISE POINT OF DESTINATION
Weight
Of Shipment
' ·./
!e..S
Ending llme
OnHWYQ
Plant
Ai-rive
"'
•·" ' ...
Chargeable
Net-Hours
FUEL REPORT
DIESEL
'' ''
Depart Arrive Deoart stand By
<, . l: -.. _ ,' .. · . .
;
.
1ime Arrived to Time Finished Allowance For
Dump Last Load Last Dump Com
:;;tion of last Load
.
GAS OIL
I agree to COtJrtcost, 100% attorney fees and an cost lhal raise from any proceedings for the collecl�n of amounts due to above earlier forw0<1< done forlhe above shiP1'"fS wii be paid by the above shipper NOTE: P.U.C. requires payment for lh .. e charg .. NOT later than 15th of the following month. A cllarge ol 1.5% per monlh '18% per annum" will be charged on all past due amounts. ATTENTION UNDERLYING CARRIERS no payment will be made for TICKETS NOT COMPLETELY filled out Not responsible for damages on del�e,y made Inside curt, line.
Driver's Signature
DRIVER'S DAILY INSPECTION
Fuel _________ _
Subject to Terms.and
Condttioris on Reverse Side
Srart ________ _
CONSIGNEE SIGNATURE- OR AGENT
Finish _________ _
OIIAdded _________ _ Starting Milage --�-------- Ending Mllage __________ _
CHECK EACH ITEM AND CIRCLE DEFECTIVE NUMBERS
ENGINE
1. __ Check OIi
2. __ Cheek Weter
3. __ Check Belts & Hoses.
START ENGINE
4. _. _ Oil
Prassura
5. __ Note Pressure Building & Air
warning Cutoff
6. __ Adjustment
7,-·-Air Loss (Engine Off Brakes
Applied 1 Minute)
8. -- Drain Air Tanks (Alternate)
INSIDE CAB
9. __ Cab Clean
10,
___ Horn Working
11. __ Windshield Wipers
12. __ Glass Clean (Cracks?)
13. __ Heater/Defroster
14. __ Mirrors
15. __ Steering Wheel (Excess
Play)
16. __
Fire Extinguisher
17. __ Emergency Flares
18, __ Current Registration &
, Insurance Certificate
OUTSIDE
19. __ Headlights
20. __ Clearance Lights
21. __ Turn Signals & +way
22. __ Sidemarker Lights
23, ___ Tail Lights
24. __ Stop Lights
25. __ Reflectors
26, -· _ Mud Flaps
27. __ Backup Alarm
TIRES & WHEELS
28._· _ Cheek For Flats
29. __ Check For Loose Lug Nuts
COMBINATION
VEHICLES
30. _._ Oil HubLevel
31. __ Wheel Seal Leaks
Remarks:----------------------------------------------
• Defective Brake and Light Items Ara Not
To Leave Yard•
. , ..
..... · ... -
.. - ......
. : ,,
. _ .. , ·, - ·"
. , , .;·,: . .-
. '•
: :· ~ ; ' -· ',
~·
.. '· . . -·:.-,:.· ....
'··'•
: • -~ t_'_:,: _ .. :. • ..•
-·--· ...
.·_
·---
..
: "JICKET ~UMBE~.:
,,:·_.. ....... ,' ..
. -,_;' .,·
_ _.·_:,-.
;.,.
--·_ ...
·,''4'
.... ··•
,..
:·· ::-· -: ...
, ...
,,. __ .. ·
.... : .
. • .···
FRESNO (559) 275-1998
Certified W.B.E.
NAME OF UNDERLYING CARRIER
SHIPPER
DATE RATE
PRECISE POINT OF ORIGIN
Kind Weight
Of Material Tag Number
II 1/.f',5,
Starting lime Deductions
Meal-Breakdown
.
CHECK ONE: Off HWY 0
W.T.B. mc.
7093 W. Belmont Ave.
Fresno, CA 93723
CA#493677 31539'2
CA NUMBER TICKET NUMBER
CONSIGNEE
CHARGES ASSESSED TYPE LOADING
Weight
Of Shipment
Ending lime
OnHWYQ
AXLES: OVER 56' 0 POWER O BUNKER Q
Plant
Arrive
Chargeable
Net-Hours
FUEL REPORT
DIESEL
PRECISE POINT OF DESTINATION
,' J'
' . .
Depart Arrive
~·-·
..
lime Arrived to Time Finished
Dump Last Load Lasf Dump
GAS OIL
Depart Stand By
Allowimce For
Completion of Last Load
.
I agree to <X>Urt cost, 100% attorney fees and all cost that raise from any proceedings for the coleclion of amounts due to above carrier for wllfl< done for the above shippecs wiH be paid by the above shipper NOTE: P.U.C. requires payment for these charges NOT later tllan 15th of the following month. A charge or 1.5% par month '18% per annum' will be charged on all past due amounts. ATTENTION UNDERLYING CARRIERS no payment WIii be made for TICKETS NOT COMPLETELY tilled out Not raspQnsible for damages on deliveiy made Inside curb line.
Drivers Signature
DRIVER'S DAILY INSPECTION
Subject to Terms and
Conditions on Reverse Side
Fuel _________ _ Equip. _________ _ Start ________ _
CONSI.GNE.E SIGNATURE - OR AGENT
Finish _________ _
OIi Added Starting Milage __________ _ Ending Milage __________ _
CHECK EACH ITEM AND CIRCLE DEFECTIVE NUMBERS
ENGINE
1. __ Check OIi
2, __ Check Water
3.__ Che<:k Belts & Hoses
START ENGINE
4. __ Oil Pressure
5. __ Note Pressure Building & Air
Warning Cutoff
6. __ Adjustment
7. __ • Air Loss (Engine Off Brakes
Applied 1 Minute)
8.-- Drain Air Tanks (Altemata)
INSIDE CAB
9. _._. Cab Clean
1D. __ Horn Wori<ing
11. __ Windshield Wlpera
12. __ Glass Clean (Cracks?)
13. __ . Heater/Qofroster
14,
__ Mirrors
15. __ Steering Wheel (Excess
Play)
16. __ Fire Extinguisher
17. __ Emergency Flares
18. __ Current Registration &
Insurance Certificate
OUTSIDE
19. __ Headlights
20. __ Clearance Lights
21. __ Turn Signals & 4-Way
22. __ Sidemari<er Lights
23. __ Tail Lights
24, __ Stop Lights
25. __ Reflector.,
26. __ Mud Flaps
27. __ Backup Alarm
TIRES & WHEELS
28. __ Che<:k For Flats
29. __ Check For Loose Lug Nuts
COMBINATION VEHICLES
30. __ Oil Hublevel
31. __ Wheel Seal Leaks
Remaf1<11: _____________________________________________ _ • Defective Bn,ke and Light Items Are Not To Leave Yard • FRESNO (559) 275-19,98
Certified W.B.E.
SHIPPER
PREC)�E PJINT OF �fllJIN
/; -- (/ J ,; /_/;(/ (_,. �
J Kind Weight
Of Material Tag Number
/J /1 / ,L.
.
�; _)
starting T11T1e
'v,\ I.//,,.
Deductions
Mea�Breakdown
CHECK' ONE: Off HWY Q
W.T.B.111c.
7093 W. Belmont Ave.
Fresno, CA 93723
CHARGES ASSES ED
CA#493677
CONSIGNEE
CAXLES: J
�· 31387·8
TICKET NUMBER
TYPE LOADING
OVER 56' Q POWER Q BUNKER Q
y} i:>Ji-= . L .
{ .- {" ,,. ,"') . ,-.,
PRECISE POINT OF DESTINA1JONj, /, /
Weight
Of Shipment
:?(, . ),)
?;�OA
Endlrigllme
s·'./t/ .
OnHWYQ
Plant
Arrive
'
\ :1,i i '1 i, - �
/
�
Chargeable
Net-Hours
FUEL REPORT
DIESEL
Depart
•· .• I .•
L
Time Arrived to
Dump Last Load
,,,.,, /(' ' <� /,.;
GAS
.
Arrive Depart Stand By
':) , .. l/:' </. .
, J :.:• r-
Time Finished Allow8nce For
Last Dump Competion of Last Load
'(".
r N ,, I
• I ,..., , __ ., .• ;1_, /
OIL
I agree to court� l00%attomey fees and all cost that raise from any �ng• for 1116 coReclion of amounls due to above earner for wOfk done for the above shippe,s wiH be paid by the above s!lipper NOTE: P.U.C. roq\Jies p,iyment for these challJes NOT later than 15th of 1116 following monlh. A chal\je of 1.5% per month '18% per annum' will be chal\jed on all peat due amounts. ATTENTION UNDERLYING CARRIERS no payment will be ma<le for TICKETS NOT COMPLETELY fflled out. Not responsible for damage• on delivery made inside curb line. ' 1 //
Drivers SignalUre
i / ,' .. ,,;,
,/',,<,/;;::: /
DRIVER'S DAILY INSPECTION
Subject toTenns and
Conditions on Reverse Side
Fuel _________ _ ----- .. ,... - ' Equip·.- .t rL,,..t: r"f t O f'r / C Ustart ________ _
CONSIGNEE SIGNATURE - ORAGENT
Finish _________ _
OilAdded _________ _ Starting Milage __________ _ Ending Mllage __________ _
CHECK EACH ITEM AND CIRCLE DEFECTIVE NUMBERS
ENGINE
1._1_ Check Oil
2.+ Chock Water
3._• _ Check Betts & Hoses
START ENGINE
4.+ Oil Pressure
s.-J.- Note Pressure Building & Air
i' Werning Cutoff
6._i_ Adjustment
7. + Air Loss (Engine Off Brakes
1 Applied 1 Minute)
8. -' -
Drain Air Tanks (Alternate)
tNSIDECAB
9._,_ Cab Clean
10._I_ Horn Worl<lng
11,+ Windshield Wipers
12,-4- Glass Clean (Cracks?)
l 13. _. _ Heater/Defroster
14. __ Mirrors
15. _; _ Steering Wheel (Excess
[ Play)
16. _1 _ Fire
Extinguisher I 17. _i__ Emergency Flares
18. _i _ Current Registration &
Insurance Certificate
OUTSIDE
19. 1 Headlights
20. + Clearance Lights
21. _; _ Turn Signals & 4-Way
22. __ • Sidemarker Lights
23, __/.., Tail Lights
24,_f_ Stop Lights
25. _/_ Reflectors
26.+ Mud Aape
27. __ BackupAlanm
TIRES & WHEELS
28. + Check For Flats
29. __ Check For Loose Lug Nuts
COMBINATION VEHICLES
30. • Oii Hubl.eve!
31."-T' Whee1Seali.eak$
Remarka: __________ -'------------'------------------------- • Defective Brake and Light Item• Are Not To Leove
Yard •
FRESNO (559) 275-1998
Certified W.B.E.
NAME OF UNDERLYING CARRIER
.1�v1.· '\
.SHIPPER
RATE
l;REC!SE PO\NT OF ORIGIN.
J_.1(7.,�; V, ), ,;, __ - ,),-:.., i ..
Kind
Of Material
/)/{
,·
starting Time
Weight
Tag Number
9Jc l .. : ..
Deductions
Mea�Breakdown
CHECK ONE: Off HWY Q
W.T.B. IHC.
CA#493677
• CONSIGNEE
Y'.�) _,, j-,, \
7093 W. Belmont Ave.
Fresno, CA 93723
·o �"' 315,39:3
TICKET NUMBER
CHARGES ASSESSED TYPE LOADING
Weight
Of Shipment
)· . ..' • ;.: ' .
En�lng Time
;;/ :i
--"
OnHWYO
AXLES: OVER 56' 0 POWER O BUNKER 0
Plant
Arrive
;::,·oo
Chargeable
Net-Hours
FUEL REPORT
DIESEL
PRECISE POINT OF DESTINATION
, . • f:;z,(. \.>·:,. •/·. -----<
Depart Arrive
:::;! : .. o- . j • .
_, ., j ,· /,
�-
Time Arrived to Time Finished
Dump Last Load Last Dump
Ct
•• :·
/ ,�--
GAS OIL
Oeoart
AlloWarice For
Completion of La>t Load
stand By
I agree to court cost, 100% attorney fees and all cost that raise ftom any proceedings for the colloc!ioo of amounts due to above carnerfor wo<'< done for the above shippers will be paid by the above ,t,ippar NOTE: P.U.C. requires peymonl for these charges NOT later then 151n of the following monllt A cltarge of 1.5% per month '18% per annum' wll be charged on all past due amounts. ATTENTION UNDERLYING CARRIERS no paymont will be made for TICKETS NOT COMPLETELY filled out. Not 1e&ponslble for damages on delivery made Inside curb line.
Drivers Signature
DRIVER'S DAILY INSPECTION
Subject to Terms and
Conditionscin Reverse Side
Fuel ____________ _
,,,)'' .· ,:., Equip . ..:..--------"-- Start _________ _ Finish _________ _ OilAdded _________ _ Starting Milage __________ _ Ending Milage __________ _
CHECK EACH ITEM AND CIRCLE DEFECTIVE NUMBERS
ENGINE ,,
1._L Check 011
,r /
2._f_ Check Water
3. __ . Check Belts & Hoses
START ENGINE
4. __ Oil Pressure
5. __ Note Pressure Building & Air
Werning
Cutoff
6._.-- Adjustment
7 ___ • 'Air Loss (Engine Off Brakes
Applied 1
Minute)
6. -- Drain Air Tanks (Alternate)
INSIDEpAB
9. __ /Cab Clean
10._-_·. Horn Working
11. __ Windshield Wipers
12. __ Glass Clean (Cracks?)
13. _L Heater/Defroster
14._··-· Mirrors
15. __ , Steering Wheel (Excess
Play)
16. __ . Fire Extinguisher
17. __ , Emergency Flares
18. __ Current Registration &
Insurance Certificate
OUTSIDE
19. __ Headlights
20. � Clearance Lights
21._·_· TurnSignals&4-Way
22. _L Sidemarker Lights
23. _ .. _· Tail Lights
24, _._· Stop Lights
25. _._. Reflectors
26. __ Mud Flaps
27, __ • BackupAlarm
TIRES & WHEELS
28. __ / Check For Flats
29. __ .··CheckForloose Lug Nuts
COMBINATION VEHICLES
30. __ Oil Hublevel
31._-_ •• Wheel Seal Leaks
Remarks:---'---------------------------------------------- • Defective Brake and Light Items Are Not To Leave Yard • 1 Day
Total $226.06
OUnited Rentals· PARTIAL RETURN
INVOICE
Q)
.µ
rl
C/l
.Q
BRANCH 641
925 NORTH BEN MADDOX WAY
VISALIA CA 93292-6620
559-627-5112
A-C ELECTRIC VISALIA BRANCH
1035 W MURRAY AVE
VISALIA CA 93291-4721
·JUL27 21m # 213602575-009
customer#
Invoice Date
Rental Out
Rental In
UR Job Loe
: 156339
: 07 /19/23
: 11/30 /22 03: 30 PM
: 07/19/23 11:11 AM
: 1035 W MURRAY AVE, V
: 430
ID:
~ Office: 661-410-0000 Cell: 559-679-7286
UR Job#
Customer Job
P.O. #
Requested By
Reserved By
Salesperson
: VR0337
: JOE MERCADO
: CLIFFGENESIS SALUDEZ
: BRYN WHITE
8.1.31111 MB0.558 20496S21.p01 405356 1-4 0
, .,1 ,h , ... 111111 1, ,1111111111111 ,, 'h, 1, 1111111 I111,11111,111111
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS:
____Q!:,y Equipment Description
- ·"- -~
1 10595346
1 907/0525
MINI EXCAVATOR 7400-9199#
Make: TAKEUCHI Model: TB240
Serial: 124002620 Meter out: 1435.80
MINI EXCAVATOR BUCKET 12"
Minimum
Meter in: 1713.80
Invoice Amount: $1, 130.31
Terms: Due Upon Receipt
Payment options: Contact our credit office 704-916-4877 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC.
P.O. BOX 051122
LOS ANGELES CA 90074-1122
Day Week 4 Week Amount
312.00 1,034.00 1,876.00 1,034.00
Rental Subtotal:
SALES/MISCELLANEOUS ITEMS:
__ _,.Q.::t..._y Item Price Unit of Measure
N/C
1,034.00
Extended Arnt.
1 CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES:
CONTACT: JOE MERCADO
CELL#: 559-556-5783
[DRSURCA/MCI]
Billing period: 7 Days From 7/12/23 03:30 PM Thru 7/19/23 11:11 AM
7.755 EACH
Sales/Misc Subtotal:
Agreement subtotal:
Tax:
Total:
7.76 7.76
1, 041. 76
88.55 1,130.31
Effective January l, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions.
NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. 1 Day
Total $127.69
8.1.31981 MB0.528 09240S21.p01 347651 2°3 0
OUnited Rentals· 4 WEEK BILLING
INVOICE
Q)
JJ
r-1
tll
,Q
~
BRANCH 641
925 NORTH BBN MADDOX WAY
VISALIA CA 93292-6620
559-627-5112
A-C ELECTRIC VISALIA BRANCH
1035 W MURRAY AVE
VISALIA CA 93291-4721
Office: 661-410-0000 Cell: 559-679-7286
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
# 213602575-008
CustQlller #
Invoice I>ate
Date Out
: 156339
: 06/29/23
Billed Through
OR Job Loe
: 11/30/22 03: 30 PM
: 07 /12/23 00: 00
: 1035 W MURRAY AVE, V
: 430 OR Job#
Customer Job
P.O. #
Requested By
Reserved By
Salesperson
ID:
: VR0337
: JOE MERCADO
: CLIFFGENESIS SALUDEZ
: BRYN WHITE
Invoice Amount: $2,553.88
Tarms: Dua Upon Receipt
Payment options: Contact our credit office 704-916--4877 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC.
P.O. BOX051122
LOS ANGELES CA 90074·1122
RENTAL ITEMS:
. -~ Equipment -==~~~!:!· ~-~~====:::::::===:::.:..---=::::....:-=:=::!"'~i~ca~i~m~=!!!!:::-...:....:. _____ Jn.....~L..::::::::::::::!!W~ee~l~c:=:=~4~We~e~k:::::-:===---Amount--- -_ --------Dernpt; loQR -= ~" =:
l 10949061 TRAILER TILT 12'-16' TO 9,999K TANDEM
Make: TOW MASTER Model: T-9DT 16'
Serial: 41<Nl3T2325l<Ll62613
l 10595346 MINI EXCAVATOR 7400-9199#
Make: TAKEUCHI Model: TB240
serial: 124002620 Meter out: 1435.80 Meter in: .00
l 907/0525 M!NI EXCAVATOR BUCKET 12"
SALES/M!SCELLANEOUS ITEMS:
_........,Q...=t .... Y Item
l CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES:
CONTACT: JOE MERCADO
CELL#: 559-556-5783
[DRSURCA/MCI]
58.71 312.00
Price
14.070
Billing period: 28 Days From 6/14/23 03:30 PM Thru 7/12/23 03:30 PM 228.13 463.73
1,034.00 1,876.00
Rental Subtotal:
Unit of Measure
EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
Total:
463.73
1,876.00
N/C
2,339.73
Extended Arnt.
14.07 14.07
2,353.80
200.08
2,553.88
Effective January l, 2021 and where pe:rmitted by lew, United Rentals may impose a surcharge of l.8% for cradit card payments on charge accounts. Thia surcharge ia not greater than our merchant discount rete for credit card tranaactiona and is subject to sales tex in some jurisdictions.
NOTICB: Thia invoice is sul:lject to the te:rms and conditions of the Rental and Service Agreement, which are available et httpa://www.unitedrentela.com/legel/rental-aervice-tema•US and which are incorporated herein by reference. A COPY OF THB RENTAL AND SBRVICE AGREEMENT TERMS ARB AVAILABLE IN PAPBR FORM UPON RBQUBST.
Page: l
CALTRANS ROW
CITY OF VISALIA DATE: 11/19/2024 UPDATED 45596
VR0337 DWR DATE: N/A
AREA DWR NO.: N/A
CONTRACTOR REPORT NO. Rpt 3
CR NO.: 63.03
EQUIPMENT
Line Equip ID Equip Class Class Make Code
Reg
Hours Rate O/T Hours O/T Factor
Delay
Hours
Delay
Factor Amount
1 - $ - $
2 - $ - $
3 - $ - $
4 - $ - $
5 - $ - $
6 - $ - $
7 - $ - $
8 - $ - $
Sub Total Equipment -$
15% Markup -$
Total Equipment -$
MATERIAL, SPECIALISTS, and RENTALS
Line Invoice Number Vendor Name Invoice Date Units Cost Cost Type Amount 10 212749913-009 UNITED RENTALS 6/6/2023 1 $ 45.71 R $45.71 11 211749913-010 UNITED RENTALS 7/4/2023 1 $ 45.71 R $45.71 12 219856216-001 UNITED RENTALS 6/5/2023 23 $ 125.69 R $2,890.87 13 219856216-002 UNITED RENTALS 7/3/2023 23 $ 118.74 R $2,731.02 14 21675924-005 UNITED RENTALS 7/8/2023 23 $ 118.74 R $2,731.02 15 216675924-004 UNITED RENTALS 6/10/2023 23 $ 118.74 R $2,731.02 16 219937839-001 UNITED RENTALS 6/8/2023 17 $ 105.79 R $1,798.43 17 219937839-002 UNITED RENTALS 7/6/2023 17 $ 105.79 R $1,798.43 18 209302038-011 UNITED RENTALS 5/30/2023 1 $ 132.12 R Sub/Specialists Markup 19 209302038-012 UNITED RENTALS 6/27/2023 1 $ 132.12 R $132.12 Subtotal Material, Subs, and Rentals 14,904.33$
15% Material Markup -$
10% Specialists Markup -$
15% Eq Rental Markup 2,235.65$
TOTAL MATERIAL, SUBS, and RENTALS 17,139.98$ LOCAL 428 LABOR CHARGES A-C Basic Labor Cost//
Line Class Name Reg hours Reg Rate
Union
Fringes
Reg
Surcharge O/T Hours OT Rate
OT Union
Fringes
O/T Sur-
charge
Sub
Units Sub Rate Amount 428-JW
- $ - $ - $ - $ - $ 428-NF
- $ - $ - $ - $ - $ 428-FMN
- $ - $ - $ - $ - $ 428-GF
- $ - $ - $ - $ - $ 428-A5
- $ - $ - $ - $ - $ 428-A6
- $ - $ - $ - $ - $ 428-A7
Subtotal Labor -$ 428-A8
Mark Up -$ 250202 removedmarkup428-A9
Total Labor -$ 428-A10428-A11
SUBTOTAL 17,139.98$ 428-A12
Subcontractor Markup -$ 428-A13
17,139.98$ 428-A14TOT AL COST THIS REPORT
A-C JOB NUMBER
CUSTOMER JOB #
DESCRIPTION
4x10 Trench Plate
4x10 Trench Plate
4X8 Trench Plate
4x4 Tench Plate
4x4 Tench Plate
A-C Electric Company
CUSTOMER
REFERENCE
Trench plates for 2 months
4X8 Trench Plate
Invoice Description
Lifting Ring
Liftng Ring
4X8 Trench Plate
4X8 Trench Plate
\\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.03 July EWB - REV 250206 Printed 2/7/2025 I
LOCAL428 LOCAL 428 LOCAL 100 LOCAL 100
A-C Basic Labor Cost // 2x Labor Charges A-C Basic Labor Cost // 2x Labor Charges3/1/23-8/31/23 JOURNEYMAN 428-JWx JOURNEYMAN 100-JW JOURNEYMAN 100-JWx J OURNEYMAN NF FOREMAN 428-NFx NF FOREMAN 100-NF NF FOREMAN 428-NFx NF FOREMAN FOREMAN 428-FMNx FOREMAN 100-FMN FOREMAN 100-FMNx FOREMAN GEN FORMAN 428-GFx GEN FORMAN 100-GF GEN FORMAN 100-GFx GEN FORMAN A1-45% 428-A5x A1-45% 100-A5 A1-45% 100-A5x A1-45%
A2-50% 428-A6x A2-50% 100-A6 A2-50% 100-A6x A2-50%
A3-55% 428-A7x A3-55% 100-A7 A3-55% 100-A7x A3-55%
A4-60% 428-A8x A4-60% 100-A8 A4-60% 100-A8x A4-60%
A5-65% 428-A9x A5-65% 100-A9 A5-65% 100-A9x A5-65%
A6-70% 428-A10x A6-70% 100-A10 A6-70% 100-A10x A6-70%A7-75% 428-A11x A7-75% 100-A11 A7-75% 100-A11x A7-75% A8-80% 428-A12x A8-80% 100-A12 A8-80% 100-A12x A8-80%
A9-85% 428-A13x A9-85% 100-A13 A9-85% 100-A13x A9-85%
A10-90% 428-A14x A10-90% 100-A14 A10-90% 100-A14x A10-90% \\jefferson\cabinet\Data\A-C Construction Group\CV\Jobs_Major_M\VR0337 Downtown Visalia Streetlight - City of Visalia\A04_Change_Requests\Proposed\CR 63.10 CORRECT 63.01\CR 63.02 R-CALTRANS ROW\Revised 250206 DRAFT\CR 63.03 July EWB - REV 250206 Printed 2/7/2025 CJ
OUnited Rentals· JUN I 5 2023 4 WEEK BILLING
INVOICE
3 ... .,
TRENCH SAFETY
JIRANCJl 990
5704 B. 2'010rA l'LACS nmS!IIO CA 9:J725-H2fl 559•ff2•'9H
DOWNTOWN STREET LIGHTS
300 NORTH TIPTON STREET
VISALIA CA 93277
Office: 661-410-0000 Celli 559-556-5783
8.1.3349 t MB0.520 84726821.pO\ 278850 1-2 0
l'll'lllll1lhlllh•l1ll•11lllnml•l•1hl•ll•11•1l1hh•ll1l1II
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
# 211749913-00!:I
CU■tomer # Invoice Date Date out
Billed Thr-ough
UR Job Loe
: 156339
: 06/06/23
l 10/10/22
t 06/19/23
; 200 NORTH
: 632
03:40 PM
QQ I 00
TIPTON STR
Ult Job •
Customer Job
P.O. #
Requested By
R•aerved By Salesperson
ID:
1 VR0337
: JOE MERCADO
1 DONALD BAILEY
: TYLER SENA
l
I
Invoice Amount: $45.71
Tarms; DJe Upon Fltolllpl
Payment� C0ntac:I OU' cncll office 704-91&-4877
REMITTO: UNITED RENTALS {NORTH AMEAICA),INC.
P.O. BOX 051122 " " '"
L
LOS ANGELES CA 90074-1122
RKNTAL ITEMS :
--2!.l: Bguipment Description Minillllllll Day Week 4 week 1 944/9894 LIFTING RING SWIVEL 1.25"
SALES/MISCELLANEOUS ITEMS:
-�O�'�Y Item
1 CA PERSONAL PROP TAX RBIMB CHARGB
COMMENTS/NOTES,
CONTACT, RYAN TOBIN
CBLL#, 559-679-7252
WILL CALL
9 .18
Price
[DRSURCA/MCI]
Billing period: 28 Days From 5/22/23 03,40 PM Thru 6/19/23 03:40 PM 9 .18
.314
18.36 41. 82
Rental Subtotal:
Onit of Measure
EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
Total,
41, B2
41.82 Bx tended Amt.
.31
42.13 3. 58
4S. 71
Bffective January 1, ao:n and whaz·• peraitted by law, t7nitlld Rental• .. Y impoH a surcharge of 1.8'1; for crlldit card payments on charge accounts. Thi1 ■urcllarga 11 not greatar than our merchant diacount rata for credit c•rd tran1actiona and ia ■ubjact to ■al•■ tu: in 1mn1 jurisdiction,.
NOTICB, Thi■ invoice !1 1ubj1ct to the tarma and coriditiona of tha Rental and Service Agra11111nt, which are availabla at httpa,//www.united.ranta1a.c011/legal/rantal-Hrvica-tar11a-us and which ara incorporated harai11 by raflranc■. A COPY OP TD RBNT.u. »m SKRVIOI AGRBBKBII'? TUMS AU AVAILABLB IIII PAPBR FORK UP0lf J!BOUBST.
Page: 1
r
a._...nnt-
. ll
OUnited Rentals·
TRENCH SAFETY
BRANCH 990
5704 S. TOYOTA PLACE
FRESNO CA 93725-8928
559-442-8989
DOWNTOWN STREET LIGHTS
300 NORTH TIPTON STREET
VISALIA CA 93277
Office: 661-410-0000 Cell:
5.2.1680 1 MB 0.528 11378S21.p01 358805 1-2 0
559-556-5783
1 1
1111
1 111
11 •II 1
1 h1
1111• h I
h II h• 1
11 • ,I 11• 1 Ml• 1
111• m •
1 1h1
1 AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS:
4 WEEK BILLING
INVOICE
# 211749913-010
Customer#
Invoice Date
Date Out
:
:
:
156339
07/04/23
10/10/22 03:40 PM
Billed Through
UR Job Loe
:
:
07/17/23
200 NORTH
00:00
TIPTON STR
UR Job#
Customer Job
P.O. #
Requested By
Reserved By
Salesperson
: 632
ID:
: VR0337
: JOE MERCADO
: DONALD BAILEY
: TYLER SENA
Invoice Amount: $45.71
T enns: Due Upon Receipt
Payment options: Contact our credit office 704-916-4877 REMIT TO: UNI TED RENTALS (NORTH AMERICA),INC.
P.O.BOX051122
LOS ANGELES CA 90074-1122
.Qty Equipm ent, �-=-=O,.,e::.:s:..:c:.:r:..::i.1:P:.::ta:i:.::o:.:;n'--""'-�--------- __ .o;Mc!:i!.!n:.:i.:::m:!:!u!!!mc.._ __ _..;D�a�x:z..... __ ,,...:w�e;;,;e:;:k�. -�.,;4;,,,;W�e;,:;e;::.k:.._ -=�-Am;:,;:.::::::,o;::.u n;;:;t ,-,-,1 __
l 944/9894 LIFTING RING SWIVEL 1. 25"
SALES/MISCELLANEOUS ITEMS:
__ .,.Q.::t..r..Y Item
1 CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES:
CONTACT: RYAN TOBIN
CELL#: 559-679-7252
WILL CALL
9.18 Price
[DRSURCA/MCI]
Billi n g period: 28 Days Fr om 6/19/23 03:40 PM Thru 7/17/23 03:40 PM ----- ---
9.18 18.36 41.82
Re n tal Subtotal:
U nit of Meas ure
.314 EACH
Sales/Misc Subt otal:
Agreeme n t Subtotal:
Tax:
Total:
41.82 41. 82
Exte nded Amt.
.31
.31
42 .13
3.58 45. 71
Effective January 1, 2021 and where permitted by law, United Rentels may impose e surcharge of 1.8% for credit card peyments on charge accounts. This surcharge is not greater than our merchant discount rate for credit cerd transactions and is subject to sales tax in some jurisdictions.
NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are aveilable et https://www.unitedrentals.com/legal/rental-service-terms-US end which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. $125.69 Each
Total $2890.87
5.1 .2020 1 t.AB O. 528 83ll27S21 .p01 275245 2-2 0
0 United Rentals·
G) ...,
....
en
TRENCH SAFETY
lllWICZJ J JO
5704 B. S'Ol'OrA PJ;.ACB
nllllllO CA JJ125-B92B
55J•44.ll-U6J
DOWNTOWN STREET LIGHTS
300 NORTH TIPTON STREET
VISALIA CA 93277
Office: 661-410-0000 Cell: 559-556-5783
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS,
~ Bquipment --~Oe=s~c~r~iP~t~i~on=----------- .,.,.
25 944/9914 ROAD PLATE 4' X 8'
SALBS/MISCELLANEOUS ITEMS:
_ ___,O,..t_.,_y It m
l CA PERSONAL PROP TAX REIMB CHARGE
1 DELIVERY CHARGE
COMMENTS/NOTES:
CONTACT: JOE MERCADO
CBLL#: 559-556 - 5783
__ __._ ___ "'-
[DRSURCA/MCI J
4 WEEK BILLING
INVOICE
21 62 1
156339
06/05/23
Cust01118r #
Invoice Date
Date Out
Billed Through
UR Job Loe
1 05/19/23 11: 00 AM
I 06/16/;B 00: 00
UR Job#
cuatomer Job
P.O. I
Reque•ted. By
Reaerved By
Sal••P•r•on
: 300 NORTH TIPTON STR
I 632
ID:
l VR0337
: JOE MERCADO
1 ANDRES LIRA
: TYLER SENA
JUN12
Invoice Amount: $3,142.29
T- ~ Upon Alceipl
Paymern opllor11: Ccnw:I oor c:recl~ ollloe 704-918-4877 AEIIT TO: UN~D RENTALS (NOFmt AMEAICA),INC.
Day
13.00 Price
20.368
160.000
P.O. BOX 061122
LOS ANGELES CA 90074-1122
Week 4 Week
- -3§'-:78- -- ios.63
Rent al Subtotal,
uni t 2£ Measure
EACH
BACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
Total:
Amount
2,715 . 75
2 , 715.75
Extended Arnt.
20.37 160,00
180 . 37
2,896.12
246 . 17
3 , 142 . 29
Billing period, 28 Daye From 5/19/23 11:00 AM Thru 6/16/23 11:00 AM •
• ---- ------- - --'------+---
Bttactive Janu•ry 1, 2021 and whara paniittad by law, tlnited Rental• may impose a surcharge ot 1,8\ tor cr,dit card payment ■ cm cnarg• account ■• Tills ■urcbarg• i ■ not ~eater than our -rchmlt d.hcount rate ror credit card tran,actiou and. ia 11lbjact to 1ala1 tu in •om• jurisdiction ■.
IIOTICB, Tbii!l invoica 1 ■ •llb:lect to tbe tar.■ and ccmd.itiona ot thi!l aantal and Ser,ice Agre-t, wnich an available at http11//..,, . unitadrntal1.c011/legal/rntal- ■ arvica-tara ■ -1'8 and. wbich ara iacorporatad. harain by refaranca. A COPY OF THB RtNTAL ANI> SllVICB AWIBJIMIDIT 'l"lltkS AR.I AVAlt.ABJ.B IN PAHR i'OIIJI UPON UQ'CIBl'l'.
Each $118.74
Total $2731.02
5.1.18271 MB0.528 10721S21.p01 356851 3·3 0
OUnited Rentals· 4 WEEK BILLING
INVOICE
Q)
.a.>
•r-1
tJl
.Q
0 lj
TRENCH SAFETY
BRANCH 990
5704 S. TOYOTA PLACE
FRESNO CA 93725-8928
559-442-8989
DOWNTOWN STREET LIGHTS
300 NORTH TIPTON STREET
VISALIA CA 93277
Office: 661-410-0000 Cell: 559-556-5783
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
# 2-19856216-002
Customer#
Invoice Date
Date Out
:
:
:
:
156339
07/03/23
05/19/23 11:00
07 /14/23 00:00
AM
Billed Through
UR Job Loe : 300 NORTH TIPTON STR
UR Job#
Customer Job
P.O. #
Requested By
Reserved By
Salesperson
: 632
ID:
: VR0337
: JOE MERCADO
: ANDRES LIRA
: TYLER SENA
Invoice Amount: $2,968.69
Tenns: Due Upon Receipt
Payment options: Contact our credit offica 704-916-48n
REMIT TO: UNITED RENTALS (NORTH AMERICA),INC.
P.O. BOX051122
LOS ANGELES CA 90074-1122
RENTAL ITEMS:
____Qb:'. Equipment Description
ROAD PLATE 4' X 8'
Minimum Day Week 4 Week Amount --===---:..-:_-:_-:::_~=:_-':_-:_-:_-:_-:_-:_-:_-:::_-:._':_':_':_-:_-:_-:_-:_-'_':__-:_-:_'-=_'--------=-===.::.._-1 25 944/9914
SALES/MISCELLANEOUS ITEMS:
__ .:Q-=.t..._y Item
1 CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES:
CONTACT: JOE MERCADO
CELL#: 559-556·5783
13.00 Price
[DRSURCA/MCI] 20.368
Billing period: 28 Days From 6/16/23 11:00 AM Thru 7/14/23 11:00 AM
39.78 108.63
Rental Subtotal:
Unit of Measure
EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
Total:
2,715.75
2,715.75
Extended Amt.
20.37 20.37
2,736.12
232.57
2,968.69
Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions.
NOTICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST.
Page: 1
Each $118.74
Total $2731.02
OUnited Rentals·
Q)
JJ
·r-1
(ll
.Q
0 l"J
TRENCH SAFETY
BRANCH 990
5704 S. TOYOTA PLACE
FRESNO CA 93725-8928
559-442-8989
300 N TIPTON
300 N TIPTON ST
VISALIA CA 93291
Office: 661-410-0000 Cell: 559-556-5783
5.1.16841 MB0.558 13274S21.p01 370912 1-1 0
•1•11•1•11l11•111••1•1111111111 l11l1••11111 1•111 •1111•111111l1III
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS:
4 WEEK BILLING
INVOICE
# 216675924-005
Customer#
Invoice Date
Date Out
: 156339
: 07 /08/23
Billed Through
UR Job Loe
: 03/01/23 01:00 PM
: 07 /19/23 00: 00
: 300 N TIPTON ST, VIS
: 652 UR Job#
Customer Job
P.O. #
Requested By
Reserved By
Salesperson
ID: STREET LIGHTS
: VR0337-9001
: JOE MERCADO
: DONALD BAILEY
: TYLER SENA
Invoice Amount: $2,968.69
Terms:
Payment options:
REMIT TO:
Due Upon Receipt
Contact our credit office 704-916-4877
UNITED RENTALS (NORTH AMERICA),INC.
P.O. BOX 051122
LOS ANGELES CA 9007 4-1122
~ Equipment Description
::::::::~--:-===~==---:-='-::-==,::::-::-"""7"-====~~~=c...:::===~A~m~o~u~n~tb:cµ_ ___ _ --~------.A..----~- - ----- "--· --- --- --··----~·- ',, Minimum Day Week 4 Week
- ____L_ -
25 944/9914 ROAD PLATE 4' X 8'
SALES/MISCELLANEOUS ITEMS:
--=Q~tY- Item
1 CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES:
CONTACT: JOE MERCADO
CELL#: 559-556-5783
Dlv/Pku loc selected by Map Pin Option
$160.00 PER LOAD DELIVERY & PICKUP
RYAN TOBIN #559-679-7252
GATE CODE 3030
39.78 13. 00
Price
[DRSURCA/MCI] 20.368
Billing period: 28 Days From 6/21/23 01:00 PM Thru 7/19/23 01:00 PM
39.78 108.63
Rental Subtotal:
Unit of Measure
EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
Total:
2,715.75
2,715.75
Extended Arnt.
20.37 20.37
2,736.12
232.57
2,968.69
Effective January 1, 2021 and where permitted by law, United Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions and is subject to sales tax in some jurisdictions.
NOTICE: This invoice is subject. to the terms and conditions of the Rental and Service Agreement, which are available at httpS://www.unitedrentals.com/legal/rental-service-terms-US and which are incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE .jl.VAILABLE IN PAPER FORM UPON REQUEST. Page: 1 Each $118.74
Total $2731.02
OUnited Rentals·
TRENCH SAFETY
.IIIUUICI 990 'JUN 18 2023
4 WEEK BILLING
INVOICE
5104 s. rororA PLACI'
l'UIRfO CA 93725-B92S
!59-4t2•'9'9
300 N TIPTON
300 N TIPTON ST
VISALIA CA 93291
Office: 661-410-0000 Cell: 559-556-5783
4.1.1548 1 MB 0.5.2B B7290521.1)()1 291867 H 0
11111 II• I 111111 Ill I 1II I 111 •d I II 1111 nl I l•I I 111111,111lli 1111 •I 11
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
ITEMS,
Equipw.ent
25 944/9914
De
ROAD PLATE 4 ' X 8 '
SALES/MISCELLANEOUS ITEMS:
_ __.O._t.._y Item
l CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES,
CONTACT: JOE MERCADO
CELL#: 559-556-5783
Dlv/Pku loo selected by Map Pin Option
$160.00 PER LOAD DELIVERY & PICKUP
RYAN TOBIN #559-679-7252
GATE CODE 3030
Minimum
39.78 [DRSURCA/MCI]
# 21 7 24-
156339
06/10/23
CU•tomer #
Invoice Date
Dat• Out
Billed Through
tJR Job Loe
1 03/01/23 01: 00 PM
; 06/21/2 3 00: 00
tJR Job#
CU•tomer Job
P.O. #
Jlequ• ■ ted. By
••••rved By
Sal•aperson
: 300 N TIPTON ST, VIS
: 652
ID1 STREET LIGHTS
: VR0337-9001
1 JOE MERCADO
: DONALD BAI LEY
I TYLER SENA
Invoice Amount: $2,968.69
Terms: Due Upon Rtollpt
Payment options: Contact our eredll office 704-916-4877 FIEt.lT TO: UNITED RENTALS {NORTH AMERICA),INC.
Da
13 .00
Prioe
20.36B
P.O. BOX 051122
LOS ANGEi.ES CA 90074-1122
Week 4 Week
39.7B 108.63
Rental Subtotal:
unit of Measure
EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
Total,
Amount
2,"115.75
2,715.75
Extended Amt.
20.37 20.37
2,736.12
232.57
2,968.69
Billing period: 28 Days From 5/24/23 01:00 PM Thru 6/21/23 01:00 PM Hf•ctive January 1, 20.'.ill and wore permitted by law, United ilm:,.tal ■ may i11poH a ai.rcharge of l..B% for cred.it card. payments on charge accounts. Thia aurcharge ia not greater than our IHrdumt di ■ oOUDt rate for credit card tr■n11actiona 1111d i ■ ■ ubject to ■ ala ■ tax in ■ oae juriadictio:ci.a.
IIOTICl1 Thia inVQiCe i ■ eubjact to the teru and co:ci.dition.e nf the lle!ltal and Service Agreeaent, lfhich are eqilahle at httpa 1;;...,,.1111itedrentala,coa/la,gal/r911tal-aarvice-ter:aa-us and which are incorporated herein by raf•r-c•. A con OP THB RBY"rAL ANt1 SIJIVICB ACJRKJDIKR'I' TaltNS ARI AVAII.ULB IN PAPIIR l'0RII UPON RBOtlBST. Page, 1 -
Each $105.79
Total $1798.43
OUnited Rentals·
TRENCH SAFETY
aRA!IC'll 99 0 5704 S. 2'01'0XA Pt.AO YSUISNO CA 93?25-8928 559-442-6969
DOWNTOWN STREET LIGHTS
300 NORTH TIPTON STREET
VISALIA CA 93277
Office: 661-410-0000 Cell: 559-556-5783
AC ELECTRIC CO
PO BOX 81977
BAKERSFIELD CA
BAKERSFIELD CA
93380-1977
RENTAL ITEMS,
~ Equipment Description
>----- 19 _9 __ 4_4 /..,..9_9_10
1 944/9913 ROAD PLATE 4' X 6'
SALES/MISCELLANEOUS ITEMS:
-~Q_t_y Item
1 CA PERSONAL PROP TAX REIMB CHARGE
1 DELIVERY CHARGE
COMMENTS/NOTES:
CONTACT: JOE MERCADO
CELL#: 559-556-5783
G1!.TE CODE #3030
Minimum
1;!.00
12.00 [DRSURCA/MCI l
7 1.3089 1 MB 0.528 86691521. pO 1 286432 3-4 o
4 WEEK BILLING
INVOICE
# 219937839-001
: 156339
I 06/08/23
cuatoa:ur #
Invoice Dat•
Dat• out
Billed Through
UR Job Loe
: 05/22/23
I 06/19/23
300 NORTH
05:00 PM
00:00
TIPTON STR
UR Job #
Customer Job
P.O. #
R•queat•d By
Reserved By
Sal•aperaon
: 632
ID:
l VR0337
l JOE MERCADO
l ANDRES LIRA
: TYLER SENA
Invoice Amount: $2,010.07
Terme: Du& Upon Receipt
Paym•nt opllons; Contact our credit office 704-918-4877 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC.
Day
12. 00
12. 00
Pri!ii:e
12. 600
160.000
P.O. BOX 051122
LOS ANGELES CA 90074-1122
Week
29-00
29.00 Rental
Unit of
EACH
EACH
Salee/Misc
Agreement
4 Week
Subtotal:
Measure
Subtotal:
Subtotal:
Tax:
Total:
Amount
Extended Amt.
12.60 160.00
172.60
1,852.60
157.47
2,010.07
Billing period: 28 Daye From S/22/23 05:00 PM Thru 6/19/23 05:00 PM Bffective January 1, 2021 and whera panaittad by law, llnitad Rantal• 111ay impoaa a •urcbarge of 1.8~ for cradit card payments ou charge accounts. Thie eurcllarge i• not greater than our marcharit di•count rata for cradit card trariaactiona arid ie subject to sales t~ in aema juri•dictiona.
NOTICB1 Thi ■ invoica is aubject to the term• arid conditiorui of tha Rental and. Sarvica A;raamant, which are available at httpa://www.unitedrentala.c0lll/la;al/rental-1arvica-tarma-US and which ara incorporated harain by rafaraoce. A COPY OF TSB RBNTAL AND BBRVICB AGRBBMBNT TBRKB ARB AVAI~BIJI IN PAPER roax UPON RBQUBBT. Page, l Each $105.79
Total $1798.43
-OUnited Rentals·
G)
,IJ
.....
tll
TRENCH SAFETY
BRANCH 990
5704 B, TOYOTA PLACB
FRitSNO CA 93725-8928
559-442-8989
DOWNTOWN STREET LIGHTS
300 NORTH TIPTON STREET
VISALIA CA 93277
g Office: 661-410-0000 Cell: 559-556-5783
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS:
----21:z Equipment Description
i------·•----
1 944/9913 ROAD PLATE 4' X 6'
SALES/MISCELLANEOUS ITEMS:
_ __.Q=t.._y Item
1 CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES:
CONTACT: JOE MERCADO
CELL#: 559-556-5783
GATE CODE #3030
"--- ----
Minimum
-- 1-2-;0{r-
12.00 [DRSURCA/MCI]
7.1.2918 1 MB 0.558 13072S21.p01 365527 3-4 0
4 WEEK BILLING
INVOICE
# 219937839-002
: 156339 Customer#
Invoice Date
Date Out
Billed Through
UR Job Loe
: 07/06/23
: 05/22/23
: 07/17/23
: 300 NORTH
: 632
05:00 PM
00:00
TIPTON STR
UR Job#
Customer Job
P.O. #
Requested By
Reserved By
Salesperson
ID:
: VR0337
: JOE MERCADO
: ANDRES LIRA
:. TYLER SENA
Invoice Amount: $1,836.47
Terms: Due l,Jpon Receipt
Payment options: Contact our credit offica 704-916-4877 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC.
Day
12.00 12.00
Price
12.600
P.O. BOX 051122
LOS ANGELES CA 90074-1122
Week 4 Week
:i,.oo 84.00
29.00 84.00
Rental Subtotal:
Unit of Measure
EACH
Sales/Misc Subtotal:
Agreement Subtotal
Tax
Total
Amount
r,s9~ J ,____
84.00 1,680.00
Extended Amt.
12.60 12.60
1,692.60
143.87
1,836.47
Billing period: 28 Days From 6/19/23 05:00 PM Thru 7/17/23 05:00 PM Effective January 1, 2021 and where permitted by law, united Rentals may impose a surcharge of 1.8% for credit card payments on charge accounts. This surcharge is not greater than our merchant discount rate for credit card transactions end is subject to sales tax in some jurisdictions.
NOTICE, This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental•service-terms-us and which are incoi:-poreted herein by reference. A COPY OF THE RENTAL AND SERVICE AGREBMBNT TERMS ARB AVAILABLE IN PAPER FORM UPON REQUEST.
Each $132.12
Total $132.12
------ -- ·- - - -- -
l0.1.37•79142F21.p01 826255384 NI 0
OUnited Rentals· 4 WEEK BILLING
JUN05 201:' INVOICE
• ,l,J
TRENCH SAFETY
BRAlfCl'l'990
5704 S. 2'0!"02"A PLACB'
1'1UlSNO CA 93725-8928
559-442-898'
# 209302038-011
Custauer #
Invoice Date
Date Out
: 156339
: 05/30/23
: 08/07 /22
; 06/11/23
.-1
tQ
DOWNTOWN STREET LIGHTS
300 NORTH TIPTON STREET
VISALIA CA 93277
Billed Through
UR Job Loe
UR Job#
Customer Job
P.O. #
Requested By
Reserved By
Salesperson
: 300 NORTH
I 632
05:00 PM
00:00
TIPTON STR
.Q
~ Office: 661-410-0000 Cell: 559-556-5783
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
RENTAL ITEMS:
__Q9:;'. Equipment Description
16 944/9917 ROAD PLATE 4' X 10'
Minimum
49.68 ID1
; VR0337
1 JOE MERCADO
: CHRISTOPHER MCKEEVER
; TYLER SENA
Invoice Amount: $2,114.03
T81ffl8: Dua ~ReoeiJX
Payment options: Con1act our cre<il offl09 7()4ell16--4877 REMIT TO: UNITED RENTALS (NORTH AMERICA)..C:.
P.O. BOX 051122
LOS ANGELES CA 90074-1122
Day Week 4 Week Amount ·-
13.50 49.68 120.8? 1,933.92
Rental Subtotal: 1,933.92
SALES/MISCELLANEOUS ITEMS:
_ __,Qo.:t:...Y Item Price unit of Measure Extended Amt. l CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES:
CONTACT: RYAN TOBIN
CELL#: 559-679-7252
GATE CODE 3030
[DRSURCA/MCI]
Billing period: 28 Days From S/14/23 05:00 PM Thru 6/11/23 05:00 PM
14.504 EACH 14.50
Sales/Misc Subtotal: 14.50
Agreement Subtotal: 1,948.42
Tax, 165.61
Total: 2,114.03
Rffecti,,.. January 1, 2021 and orbere penaitud by law, llllited ...,tala aay illpoa. a surc:barge of 1.1'11 for credit c:.rd payaent11 on charge account•- Thie eurchllrge ie not greater tti.n our merchant discount rate for credit card tran ■ actions and ie auhject to sales tal< in acme juriadictiona.
JIOTlCR: 'l'his invoice i ■ ■ uhj ■ ct to the ter11111 and c:ouditiOD11 of the R ■ ntal and Service Agre-,t, whic:h are avail-1;,le at httpa,//--.unitedrantal ■ .c:om/legal/rantal- ■ ervice-t ■ nu-UB and which are incorporeted b ■ rain by reference. A COPY OP TIIJI RIIHTAL ARD HIWICB l\GRIQINP"I" TIIRJIS ll1i: AV1IloABlJC D' PAPD POD Ul10II' UQUEST.
Each $132.12
Total $132.12
-------!---------"■
OUnited Rentals·
TRENCH SAFETY
.11.RANCB 9 9 0 'JUlt3 tlm
4 WEEK BILLING
INVOICE m .
'
GJ
,IJ
•I"!
ti.I
~
5704 S, !l'OYOTA PLACll
rusNO CA 93725-8928
559-442-8989
DOWNTOWN STREET LIGHTS
300 NORTH TIPTON STREET
VISALIA CA 93277
Office: 661-410-0000 Cell:
8.1.33442 MB0.528 05384S21.p01 339999 1-5 0
559-556-5783
11I11ll11ll l1lll l•I• 11111111111 I I p1lll1I 111 lull 11111'1111111111
AC ELECTRIC CO BAKERSFIELD CA
PO BOX 81977
BAKERSFIELD CA 93380-1977
# 209302038-012
Customer#
Invoice Date
Date Out
Billed Through
UR Job Loe
156339
06/27 /23
08/07/22
07/09/23
300 NORTH
632
05:00 PM
00:00
TIPTON STR
UR Job#
customer Job
P.O. #
Requested By
Reserved By
Salesperson
.
ID:
: VR0337
: JOE MERCADO
: CHRISTOPHER MCKEEVER
: TYLER SENA
Invoice Amount: $2,114.03
Terms:
Payment options:
REMIT TO:
Due Upon Receipt
Contact our cl'Bdlt office 704-91B-4Bn
UNITED RENTALS (NORTH AMERICA),INC.
P.O. BOX051122
LOS ANGELES CA90074-1122
RENTAL ITEMS:
~ Equipment Description Minimum Day Week 4 Week Amount
I
SALES/MISCELI,ANEQUS ITEMS:
_ ___,Q--=t_._y Item
1 CA PERSONAL PROP TAX REIMB CHARGE
COMMENTS/NOTES:
CONTACT: RYAN TOBIN
CELL#: 559-679-7252
GATE CODE 3030
Price
[DRSURCA/MCI] 14.504
Billing period: 28 Days From 6/11/23 05:00 PM Thru 7/09/23 05:00 PM ~6.8
Rental Subtotal:
Unit of Measure
EACH
Sales/Misc Subtotal:
Agreement Subtotal:
Tax:
Total,
_].]~3:}. ~2
1,933.92
Extended Amt.
14.50 14.50
1,948.42
165.61
2,114.03
Bffective January l, 2021 end where permitted ,by law, United Rentals may impose a surcharge of 1,8\ for credit card payments on charge accounts, Thia surcharge is not greeter then our merchant discount rate for credit card transactions and is subject to sales te~ in some jurisdictions.
NOTICB: Thia invoice is subject to the terms end conditions of the Rental and Service Agreement, which are available at httpa://www.unitedrentala.com/legal/rental-aervice-terma-lJS end which ere incorporated herein by reference. A COPY OF THB RENTAL AND SBRVICB AGREBMBNT TBRMS ARB AVAILABLB IN PAPBR FORM UPON RBQtJBST. Page: l
CHANGE ORDER FORM
Downtown Stre etlight
Change Order No.: 5 City Project No.: 1410-72000/CP0345-999 Submitted by: Eric Bans Federal No.:
Date Submitted: May 23, 2025 Purchase Order No.: P03139A Committee Review Date: May 28, 2025 Package No. of Pages Engineer Contractor Specifications Plans Exhibits
Change Requested by: I X I I Attachments: I X
To: A-C Electric Company Contractor
You are directed to make the following changes from the plans and specifications or do the following described work not included in the plans and specifications for this contract. NOTE: This change order is not effective until approved by the Engineer.
DESCRIPTION OF WORK:
Description of work to be done, estimate of quantities and prices to be paid. (Segregate between additional work at contract price, agreed price and force account.) Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. The last percentage shown is the net accumulated increase or decrease from the original quantity in the Bid Item List.
Categories: E&O=Errors & Omissions; UT=Utllities; BQ=Balance of Quantities; UN=Unforeseen; CofS=Owner Directed Change of Scope Item
No. Category Description of Change Order Net increase *Net decrease Total Change 1 CofS Change Out GFI Receptacles (LS) $9,820.00 $0.00 $9,820.00 2 CofS Lighting Controller Wi-Fi (LS) $4,141.14 $0.00 $4,141.14 3 4
5 6
Total Cost of Change Order: $13,961.14 $0.00 $13,961.14 * note: enter "decrease" as a negative number (i.e. -1000) Item Details:
Note: Include Method of Payment, Location & Limits of Work, Description of Work to be Done, Applicable Specification Changes, Plan Sheet Changes, and Exhibits to provide clear direction. Attach all supporting documents for CO Committee.
ITEM 1 - Change Out GFI Receptacles - Lump Sum
Compensation at agreed lump sum to the contractor for switching out 30 GFI receptacles installed per plan on top of street light poles with non-GFI rated receptacles. This work was requested by the Downtown Visalians /City of Visalia ITEM 2 -Lighting Controller Wi-Fi - Lump Sum
Compensation at agreed lump sum to the contractor for providing and installing Lighting Controls with photo & Bluetooth Interface. Price Includes Relay Panel, Bluetooth interface, photo sensor, mounted in exterior can on the side of existing meter pedestal, internal wiring, setup & commissioning adjacent to Panel B on Main Street. This work was requested by the Downtown Visalians/City of Visalia.
Original Contract Amount: $6,279,317.60
Net cost of this Change Order: $13,961.14 0.22% Increase / Decrease Total cost of previous Change Orders: $744,789.41 11.86% of Original Contract Amount New Contract Amount: $7,038,068.15 12.08% Over Original Contract Amount Note: Change Order Increases greater than $100,000 require City Council authorization.
Previously granted additional days: 119 Original Date of Completion per Contract: 5/19/2023 Contract work days added this CO: 0 New Date of Completion: 11/15/2023 I
- n '
- r [j_
'
L,~-
"
J
. '
-
'
.
6/2/25
6/6/25
We the undersigned contractor, have given careful consideration to the change proposed and agree to provide equipment, furnish materials, and perform the work specified, and will accept as full payment the prices shown above.
NOTE: If you do not sign this order, you are directed to proceed with the ordered work. You may file a Request for Information within the time specified.
CONTRACTOR ACCEPTANCE BY
/-i.uo1 ( v1A·V\ (Yui--e l Vvi () I au:> t n((lzS:'
~
Signature Print Name & Title - Date
APPROVAL RECOMMENDED BY CONSTRUCTION MANAGER
~
~
- - -- -___.-::::; . Kirt Carr, Team Manager/CM Engineer -- , - SignEiture Print Name & Title Date
APPROVAL RECOMMENDED BY PROJECT ENGINEER
E1 ir:: Br,115 1 Se11ir,1 eioil E11gil 1ee1
Signature Print Name & Title Date
ENGINEER APPROVAL BY SUPERVISOR/DEPART. HEAD
~~
Christopher Crawford, City Engineer, for
Jason Huckleberry Eng. & Bldg. Director
Signature Print Name & Title Date
CHANGE ORDER COMMITTEE ACTION:
(note: Committee Chair to check appropriate action)
Approved: I I Resubmit w/changes: I I
Approved w/revisions: I I Denied: I I
, Committee Chair
Signature Print Name & Title Date
0 Days