HCM LOS D D
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity (veh/h) 86 233 323 - - 61 - - 129 315
HCM Lane V/C Ratio 0.233 0.201 0.087 - - 0.016 - - 0.34 0.538 HCM Ctrl Dly (s/v) 59.2 24.3 8.8 0 - 8.2 0 - 46.6 29
HCM Lane LOS F C A A - A A - E D
HCM 95th %tile Q(veh) 0.8 0.7 0.3 - - 0 - - 1.4 3
1729
HCM Signalized Intersection Capacity Analysis Cumulative 5-Year plus Buildout PM Peak 5: Lovers Lane & Sunnyside Avenue 02/04/2026
Improved Synchro 12 Report
JLB Traffic Engineering, Inc.
Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations
Traffic Volume (vph) 32 0 6 62 0 79 1 22 615 87 18 156
Future Volume (vph) 32 0 6 62 0 79 1 22 615 87 18 156
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.2 4.2 4.2 4.2 4.2 6.0 6.0 4.2
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 Frt 1.00 0.85 1.00 0.85 1.00 1.00 0.85 1.00
Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95
Satd. Flow (prot) 1752 1568 1752 1568 1752 3505 1568 1752 Flt Permitted 0.95 1.00 0.95 1.00 0.95 1.00 1.00 0.95
Satd. Flow (perm) 1752 1568 1752 1568 1752 3505 1568 1752 Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Adj. Flow (vph) 37 0 7 71 0 91 1 25 707 100 21 179
RTOR Reduction (vph) 0 6 0 0 77 0 0 0 0 62 0 0
Lane Group Flow (vph) 37 1 0 71 14 0 0 26 707 38 0 200
Turn Type Prot NA Prot NA Prot Prot NA Perm Prot Prot
Protected Phases 7 4 3 8 5 5 2 1 1
Permitted Phases 2
Actuated Green, G (s) 2.4 5.9 6.4 9.9 1.0 24.3 24.3 8.4 Effective Green, g (s) 2.4 5.9 6.4 9.9 1.0 24.3 24.3 8.4 Actuated g/C Ratio 0.04 0.09 0.10 0.16 0.02 0.38 0.38 0.13 Clearance Time (s) 4.2 4.2 4.2 4.2 4.2 6.0 6.0 4.2
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Lane Grp Cap (vph) 66 145 176 244 27 1339 599 231
v/s Ratio Prot 0.02 0.00 c0.04 c0.01 0.01 c0.20 c0.11
v/s Ratio Perm 0.02
v/c Ratio 0.56 0.00 0.40 0.06 0.96 0.53 0.06 0.87
Uniform Delay, d1 30.1 26.2 26.8 22.9 31.3 15.2 12.4 27.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 10.4 0.0 1.5 0.1 156.3 0.4 0.0 27.0 Delay (s) 40.5 26.2 28.3 23.0 187.6 15.6 12.5 54.0
Level of Service D C C C F B B D
Approach Delay (s/veh) 38.2 25.3 20.6
Approach LOS D C C
Intersection Summary
HCM 2000 Control Delay (s/veh) 21.6 HCM 2000 Level of Service C HCM 2000 Volume to Capacity ratio 0.50
Actuated Cycle Length (s) 63.6 Sum of lost time (s) 18.6 Intersection Capacity Utilization 48.7% ICU Level of Service A Analysis Period (min) 15
c Critical Lane Group
't --- %i tt .,,
1730
HCM Signalized Intersection Capacity Analysis Cumulative 5-Year plus Buildout PM Peak 5: Lovers Lane & Sunnyside Avenue 02/04/2026
Improved Synchro 12 Report
JLB Traffic Engineering, Inc.
Movement SBT SBR
Lane Configurations
Traffic Volume (vph) 476 39
Future Volume (vph) 476 39
Ideal Flow (vphpl) 1900 1900
Total Lost time (s) 6.0
Lane Util. Factor 0.95
Frt 0.99
Flt Protected 1.00
Satd. Flow (prot) 3465
Flt Permitted 1.00
Satd. Flow (perm) 3465
Peak-hour factor, PHF 0.87 0.87
Adj. Flow (vph) 547 45
RTOR Reduction (vph) 5 0
Lane Group Flow (vph) 587 0
Turn Type NA
Protected Phases 6
Permitted Phases
Actuated Green, G (s) 31.7
Effective Green, g (s) 31.7
Actuated g/C Ratio 0.50
Clearance Time (s) 6.0
Vehicle Extension (s) 3.0
Lane Grp Cap (vph) 1727
v/s Ratio Prot 0.17
v/s Ratio Perm
v/c Ratio 0.34
Uniform Delay, d1 9.6
Progression Factor 1.00
Incremental Delay, d2 0.1
Delay (s) 9.8
Level of Service A
Approach Delay (s/veh) 20.9
Approach LOS C
Intersection Summary
1731
HCM 7th TWSC Cumulative 5-Year plus Buildout PM Peak
12: Road 148 & Caldwell Avenue 02/04/2026
Improved Synchro 12 Report
JLB Traffic Engineering, Inc.
Intersection
Int Delay, s/veh 5.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 20 331 24 21 371 32 15 72 29 18 46 42 Future Vol, veh/h 20 331 24 21 371 32 15 72 29 18 46 42 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - 250 - - 250 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 3 3 3 3 3 3 3 3 3 3 3 3
Mvmt Flow 22 368 27 23 412 36 17 80 32 20 51 47
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 448 0 0 394 0 0 910 920 381 929 916 430 Stage 1 - - - - - - 426 426 - 477 477 -
Stage 2 - - - - - - 484 494 - 452 439 -
Critical Hdwy 4.13 - - 4.13 - - 7.13 6.53 6.23 7.13 6.53 6.23 Critical Hdwy Stg 1 - - - - - - 6.13 5.53 - 6.13 5.53 - Critical Hdwy Stg 2 - - - - - - 6.13 5.53 - 6.13 5.53 - Follow-up Hdwy 2.227 - - 2.227 - - 3.527 4.027 3.327 3.527 4.027 3.327 Pot Cap-1 Maneuver 1107 - - 1159 - - 254 270 664 247 271 623 Stage 1 - - - - - - 605 584 - 567 555 -
Stage 2 - - - - - - 562 545 - 585 576 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1107 - - 1159 - - 181 256 664 156 257 623 Mov Cap-2 Maneuver - - - - - - 181 256 - 156 257 -
Stage 1 - - - - - - 589 569 - 552 540 -
Stage 2 - - - - - - 458 530 - 466 562 -
Approach EB WB NB SB
HCM Ctrl Dly, s/v 0.44 0.4 23.52 20.98
HCM LOS C C
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity (veh/h) 181 311 95 - - 88 - - 156 357
HCM Lane V/C Ratio 0.092 0.361 0.02 - - 0.02 - - 0.129 0.274 HCM Ctrl Dly (s/v) 26.9 23 8.3 0 - 8.2 0 - 31.5 18.8
HCM Lane LOS D C A A - A A - D C
HCM 95th %tile Q(veh) 0.3 1.6 0.1 - - 0.1 - - 0.4 1.1
1732
Queuing and Blocking Report Cumulative 5-Year plus Buildout AM Peak Improved 02/04/2026
Improved SimTraffic Report
JLB Traffic Engineering, Inc.
Intersection: 1: Lovers Lane & Walnut Avenue
Movement EB EB EB EB WB WB WB WB NB NB NB NB
Directions Served L T T R L T T R UL T T R
Maximum Queue (ft) 159 126 110 80 112 119 108 64 242 157 150 56 Average Queue (ft) 64 60 51 32 56 74 52 19 131 69 83 19 95th Queue (ft) 124 102 89 64 106 113 93 45 215 124 138 45 Link Distance (ft) 793 793 2525 2525 2492 2492
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 300 180 300 270 180 100
Storage Blk Time (%) 4 4
Queuing Penalty (veh) 9 3
Intersection: 1: Lovers Lane & Walnut Avenue
Movement SB SB SB SB
Directions Served UL T T R
Maximum Queue (ft) 171 176 161 192
Average Queue (ft) 68 103 81 31
95th Queue (ft) 131 155 138 85
Link Distance (ft) 2524 2524
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 220 100
Storage Blk Time (%) 4
Queuing Penalty (veh) 6
Intersection: 2: Pinkham Street & K Avenue
Movement EB EB WB WB NB SB
Directions Served L TR L TR LTR LTR
Maximum Queue (ft) 47 62 25 81 101 92
Average Queue (ft) 22 30 3 37 52 44
95th Queue (ft) 39 51 16 67 84 71
Link Distance (ft) 1330 2545 930 2251
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 200 150
Storage Blk Time (%)
Queuing Penalty (veh)
1733
Queuing and Blocking Report Cumulative 5-Year plus Buildout AM Peak Improved 02/04/2026
Improved SimTraffic Report
JLB Traffic Engineering, Inc.
Intersection: 3: Lovers Lane & K Avenue
Movement EB EB NB SB SB SB
Directions Served L R UL U T TR
Maximum Queue (ft) 72 79 89 25 19 31
Average Queue (ft) 19 31 34 2 1 1
95th Queue (ft) 50 55 70 14 6 10
Link Distance (ft) 2545 2492 2492
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 115 290 100
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 4: Lovers Lane & Driveway A
Movement WB NB NB
Directions Served R T TR
Maximum Queue (ft) 67 35 17
Average Queue (ft) 22 1 1
95th Queue (ft) 53 12 6
Link Distance (ft) 200 591 591
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 5: Lovers Lane & Sunnyside Avenue
Movement EB EB WB WB NB NB NB NB SB SB SB
Directions Served L TR L TR UL T T R UL T TR
Maximum Queue (ft) 51 54 106 84 50 147 119 37 73 155 175 Average Queue (ft) 35 16 45 34 8 63 52 6 32 60 53
95th Queue (ft) 58 48 88 61 30 128 105 24 62 125 123
Link Distance (ft) 670 317 470 470 591 591
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 250 80 100 300
Storage Blk Time (%) 4 1
Queuing Penalty (veh) 0 0
1734
Queuing and Blocking Report Cumulative 5-Year plus Buildout AM Peak Improved 02/04/2026
Improved SimTraffic Report
JLB Traffic Engineering, Inc.
Intersection: 6: Sunnyside Avenue & Driveway B
Movement EB SB
Directions Served LT LR
Maximum Queue (ft) 31 67
Average Queue (ft) 5 34
95th Queue (ft) 24 59
Link Distance (ft) 317 216
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 7: Sunnyside Avenue & Driveway C
Movement EB SB
Directions Served LT LR
Maximum Queue (ft) 31 50
Average Queue (ft) 3 23
95th Queue (ft) 16 46
Link Distance (ft) 344 222
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 8: Driveway D & Sunnyside Avenue
Movement NB SB
Directions Served LTR LTR
Maximum Queue (ft) 54 53
Average Queue (ft) 23 26
95th Queue (ft) 48 53
Link Distance (ft) 222 222
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
1735
Queuing and Blocking Report Cumulative 5-Year plus Buildout AM Peak Improved 02/04/2026
Improved SimTraffic Report
JLB Traffic Engineering, Inc.
Intersection: 9: Lovers Lane & Driveway E
Movement WB
Directions Served R
Maximum Queue (ft) 31
Average Queue (ft) 18
95th Queue (ft) 42
Link Distance (ft) 200
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 10: Caldwell Avenue & Pinkham Street
Movement EB SB SB
Directions Served L L R
Maximum Queue (ft) 53 52 69
Average Queue (ft) 14 24 27
95th Queue (ft) 41 45 51
Link Distance (ft) 1815
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 165 200
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 11: Lovers Lane & Caldwell Avenue
Movement EB EB EB WB WB WB NB NB NB SB SB SB
Directions Served L T TR L T TR L T TR UL T TR
Maximum Queue (ft) 116 174 140 113 142 175 118 160 198 249 275 256 Average Queue (ft) 46 83 59 48 93 90 45 82 71 78 166 125 95th Queue (ft) 84 147 110 88 144 154 91 144 132 148 252 218 Link Distance (ft) 1215 1215 1121 1121 765 765 750 750
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 230 90 150 125
Storage Blk Time (%) 2 11 0 1 18
Queuing Penalty (veh) 3 7 0 2 21
1736
Queuing and Blocking Report Cumulative 5-Year plus Buildout AM Peak Improved 02/04/2026
Improved SimTraffic Report
JLB Traffic Engineering, Inc.
Intersection: 12: Road 148 & Caldwell Avenue
Movement EB WB NB NB SB SB
Directions Served LTR LTR L TR L TR
Maximum Queue (ft) 90 52 52 53 56 54
Average Queue (ft) 18 4 13 21 21 34
95th Queue (ft) 56 23 40 43 44 52
Link Distance (ft) 3994 5284 2538 2586
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 250 250
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 21: Bend
Movement SB SB
Directions Served T
Maximum Queue (ft) 47 53
Average Queue (ft) 2 3
95th Queue (ft) 16 21
Link Distance (ft) 765 765
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 51
1737
Queuing and Blocking Report Cumulative 5-Year plus Buildout PM Peak Improved 02/04/2026
Improved SimTraffic Report
JLB Traffic Engineering, Inc.
Intersection: 1: Lovers Lane & Walnut Avenue
Movement EB EB EB EB WB WB WB WB NB NB NB NB
Directions Served L T T R L T T R UL T T R
Maximum Queue (ft) 114 126 128 85 88 89 65 42 195 172 170 87 Average Queue (ft) 50 68 50 34 49 48 23 14 101 90 97 26 95th Queue (ft) 93 107 101 67 84 81 47 34 162 156 163 55 Link Distance (ft) 788 788 2525 2525 2492 2492
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 300 180 300 270 180 100
Storage Blk Time (%) 1 0 11 0
Queuing Penalty (veh) 2 0 9 0
Intersection: 1: Lovers Lane & Walnut Avenue
Movement SB SB SB SB
Directions Served UL T T R
Maximum Queue (ft) 264 268 281 200
Average Queue (ft) 127 126 105 33
95th Queue (ft) 219 203 199 89
Link Distance (ft) 2524 2524
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 220 100
Storage Blk Time (%) 2 1 6
Queuing Penalty (veh) 4 1 7
Intersection: 2: Pinkham Street & K Avenue
Movement EB EB WB WB NB SB
Directions Served L TR L TR LTR LTR
Maximum Queue (ft) 45 78 25 57 97 88
Average Queue (ft) 19 26 8 25 45 38
95th Queue (ft) 37 49 26 49 77 64
Link Distance (ft) 1330 2545 930 2251
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 200 150
Storage Blk Time (%)
Queuing Penalty (veh)
1738
Queuing and Blocking Report Cumulative 5-Year plus Buildout PM Peak Improved 02/04/2026
Improved SimTraffic Report
JLB Traffic Engineering, Inc.
Intersection: 3: Lovers Lane & K Avenue
Movement EB EB NB NB SB SB
Directions Served L R UL T U TR
Maximum Queue (ft) 70 53 72 30 23 22
Average Queue (ft) 21 21 26 1 2 1
95th Queue (ft) 51 44 55 10 11 7
Link Distance (ft) 2545 590 2492
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 115 290 100
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 4: Lovers Lane & Driveway A
Movement WB
Directions Served R
Maximum Queue (ft) 31
Average Queue (ft) 9
95th Queue (ft) 32
Link Distance (ft) 200
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 5: Lovers Lane & Sunnyside Avenue
Movement EB EB WB WB NB NB NB NB SB SB SB
Directions Served L TR L TR UL T T R UL T TR
Maximum Queue (ft) 87 31 67 46 50 200 199 49 203 225 149 Average Queue (ft) 26 8 33 23 14 101 99 21 118 74 53
95th Queue (ft) 62 30 62 46 39 183 179 44 200 165 117
Link Distance (ft) 670 317 470 470 591 591
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 100 250 80 100 300
Storage Blk Time (%) 0 12 9
Queuing Penalty (veh) 0 3 8
1739
Queuing and Blocking Report Cumulative 5-Year plus Buildout PM Peak Improved 02/04/2026
Improved SimTraffic Report
JLB Traffic Engineering, Inc.
Intersection: 6: Sunnyside Avenue & Driveway B
Movement EB SB
Directions Served LT LR
Maximum Queue (ft) 70 55
Average Queue (ft) 13 28
95th Queue (ft) 49 48
Link Distance (ft) 317 216
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 7: Sunnyside Avenue & Driveway C
Movement EB SB
Directions Served LT LR
Maximum Queue (ft) 31 78
Average Queue (ft) 2 14
95th Queue (ft) 14 50
Link Distance (ft) 344 222
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 8: Driveway D & Sunnyside Avenue
Movement NB SB
Directions Served LTR LTR
Maximum Queue (ft) 79 53
Average Queue (ft) 22 26
95th Queue (ft) 53 46
Link Distance (ft) 222 222
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
1740
Queuing and Blocking Report Cumulative 5-Year plus Buildout PM Peak Improved 02/04/2026
Improved SimTraffic Report
JLB Traffic Engineering, Inc.
Intersection: 9: Lovers Lane & Driveway E
Movement WB
Directions Served R
Maximum Queue (ft) 31
Average Queue (ft) 16
95th Queue (ft) 41
Link Distance (ft) 200
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 10: Caldwell Avenue & Pinkham Street
Movement EB SB SB
Directions Served L L R
Maximum Queue (ft) 72 28 85
Average Queue (ft) 21 9 25
95th Queue (ft) 57 29 54
Link Distance (ft) 1815
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 165 200
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 11: Lovers Lane & Caldwell Avenue
Movement EB EB EB WB WB WB NB NB NB SB SB SB
Directions Served L T TR L T TR L T TR UL T TR
Maximum Queue (ft) 200 139 108 95 169 161 118 168 161 155 224 237 Average Queue (ft) 112 89 50 36 76 86 55 101 101 76 86 60 95th Queue (ft) 180 136 99 76 127 145 100 147 153 135 163 142 Link Distance (ft) 1215 1215 1121 1121 765 765 750 750
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 230 90 150 125
Storage Blk Time (%) 0 5 1 2 5
Queuing Penalty (veh) 0 3 0 4 5
1741
Queuing and Blocking Report Cumulative 5-Year plus Buildout PM Peak Improved 02/04/2026
Improved SimTraffic Report
JLB Traffic Engineering, Inc.
Intersection: 12: Road 148 & Caldwell Avenue
Movement EB WB NB NB SB SB
Directions Served LTR LTR L TR L TR
Maximum Queue (ft) 73 53 30 54 53 77
Average Queue (ft) 11 6 7 34 10 31
95th Queue (ft) 44 31 25 53 33 57
Link Distance (ft) 3994 5284 2538 2586
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft) 250 250
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 47
1742
www.JLBtraffic.com
[email protected]
516 W. Shaw Ave., Ste. 103
Fresno, CA 93704 App | M
(559) 570-8991
Appendix M: Traffic Signal Warrants
JlB!RAf.f.!f
-=-=-=-=-==-
1743
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Pinkham Street
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/05/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Existing Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
182
(280)
Minor Street
158 103
(84) (160) (112) 158 161 103
321 302
MINIMUM REQUIREMENTS
(120)
105 154 111
Both Approaches
254
161
(336) 185 277
(80% SHOWN IN BRACKETS)
150 200 140 91
91 123 134
123
154 111
Highest Approach 134
Major Street (480) 182
420 302
240
500 350
(400) 216
600 321 216 185 240 254 277
1 U R
7:00 AM8:00 AM12:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM12:00 AM
TWO WARRANTS SATISFIED
80%
182
161 103
277 182
161 103
216 185 302
254
240
277
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
134
75 53 100 70
REQUIREMENT
Minor Street (42) (80) 154 111 91 123
154 111
Yes
(60) (56) 158
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 185 302
U
(600) (720) (504) 321
7:00 AM8:00 AM12:00 PM2:00 PM
U R
750 216 240
Major Street
Highest Approach
(420)
91 123 134 158
254
APPROACH LANES
Both Approaches 321
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
r P
I V
r P
--~I I r ~ I
1744
7:00 AM 2:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/05/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2. Pinkham Street / K Avenue
277
123 158 161
(Higher Volume Approach)
321
154
Major Street
(Total of Both Approaches)
Minor Street
302 254
Warrant 2: Four-Hour Vehicular Volume (Rural)
Existing Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 --
.---=--=-t=-"':.~~l====jj:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r.' r r
r
JLB!!Af.US. - - - - ----
•
1745
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Existing Traffic Conditions
2. Pinkham Street / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
177 (161) VPH
Pinkham Street Total of Both Approaches =
378 (277) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400 2 lR JE LA1 & 21 MJ LANEl
2 oJ MOREi LANESI & 1 LA~E
300
200
100 * ----+---+--+---t-------t--=,._____=:1----+===- ~ -=±===-----11----- 100· ~ -+- - ---1--= ....... -- 75•
300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!Af.f.!S.
- - -
1746
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Lovers Lane
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Existing Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
623
(280)
Minor Street
95 79
(84) (160) (112) 95 104 79
885 837
MINIMUM REQUIREMENTS
(120)
105 93 63
Both Approaches
945
104
(336) 704 945
(80% SHOWN IN BRACKETS)
150 200 140 49
49 67 89
67 93 63
Highest Approach 89
Major Street (480) 623
420 837
927
500 350
(400) 762
600 885 762 704 927 945 945
1 U R
7:00 AM8:00 AM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM4:00 PM
TWO WARRANTS SATISFIED
80%
623
104 79
945 623
104 79
762 704 837
945
927
945
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
89 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 93 63 49 67
93 63
Yes
(60) (56) 95
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 704 837
U
(600) (720) (504) 885
7:00 AM8:00 AM1:00 PM2:00 PM
U R
750 762 927
Major Street
Highest Approach
(420)
49 67 89 95
945
APPROACH LANES
Both Approaches 885
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
P r
I V
r P
--~I I r ~ I
1747
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
3. Lovers Lane / K Avenue
945
89 95 104
(Higher Volume Approach)
885
93 Major Street
(Total of Both Approaches)
Minor Street
927 945
Warrant 2: Four-Hour Vehicular Volume (Rural)
Existing Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-1<:=-----"::;,--.=-__,'rr-r -1--=::::i===~ ~ ~ :jl:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r rv r
r
JLB!!Af.US. - - - - ----
•
1748
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Existing Traffic Conditions
3. Lovers Lane / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
104 (71) VPH
Lovers Lane Total of Both Approaches =
983 (993) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
300
JlB !!&.f.E!s. - - - -
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1749
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Existing Traffic Conditions
Lovers Lane
Sunnyside Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
2:00 PM
U R
7:00 AM8:00 AM12:00 PM3:00 PM4:00 PM
2 or More 1:00 PM
5:00 PM
Major Street (480) 916
420 679
822
500 350
(400) 738
600 874 738 615 822 910 931
1 150 200 140 26
26 27 32
27 74 30
Highest Approach 32
(80% SHOWN IN BRACKETS)
910
31 (336) 615 931
916
(280)
Minor Street
30 33
(84) (160) (112) 30 31 33
874 679
MINIMUM REQUIREMENTS
(120)
105 74 30
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
822
Major Street
Highest Approach
(420)
26 27 32 30
910
APPROACH LANES
Both Approaches 525 900 630 874 615 679
U
(600) (720) (504) 874
7:00 AM8:00 AM12:00 PM1:00 PM
U R
750 738
2. INTERRUPTION OF CONTINUOUS TRAFFIC
32 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 74 30 26 27
74 30
Yes
(60) (56) 30
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
916
31 33
931 916
31 33
738 615 679
910
822
931
4:00 PM5:00 PM
1 2 or More
R
2:00 PM12:00 AM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r r;;
r r;;
r r;;
I /
r r;;
r r;;
I V
r r;;
--~I I r ~ I
1750
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
5. Lovers Lane / Sunnyside Avenue
916
30 31 33
(Higher Volume Approach)
874
74 Major Street
(Total of Both Approaches)
Minor Street
910 931
Warrant 2: Four-Hour Vehicular Volume (Rural)
Existing Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 ,--=--=-t:.-::."':.:il *====-=!1:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r rv r
r
JLB!!Af.US. - - - - ----
•
1751
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Existing Traffic Conditions
5. Lovers Lane / Sunnyside Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Sunnyside
Avenue
Highest
Approach
Volume =
72 (35) VPH
Lovers Lane Total of Both Approaches =
985 (972) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400 2 lR JE LA1 & 21 MJ LANEl
2 oJ MOREi LANESI & 1 LA~E
300
200
100 ----+---+--+---t-------t--=,._____=:1----+===--=±===-----11----- 100· 300
JlB !!Af.f.!S.
- - -
7ill<ir+- - ---1--= ....... -- 75•
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1752
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Existing Traffic Conditions
Pinkham Street
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
3:00 PM
U R
11:00 AM12:00 PM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
Major Street (480) 625
420 669
741
500 350
(400) 659
600 644 659 629 741 698 712
1 150 200 140 45
45 59 66
59 38 38
Highest Approach 66
(80% SHOWN IN BRACKETS)
698
48 (336) 629 712
625
(280)
Minor Street
56 50
(84) (160) (112) 56 48 50
644 669
MINIMUM REQUIREMENTS
(120)
105 38 38
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
741
Major Street
Highest Approach
(420)
45 59 66 56
698
APPROACH LANES
Both Approaches 525 900 630 644 629 669
U
(600) (720) (504) 644
11:00 AM12:00 PM1:00 PM2:00 PM
U R
750 659
2. INTERRUPTION OF CONTINUOUS TRAFFIC
66 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 38 38 45 59
38 38
Yes
(60) (56) 56
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
625
48 50
712 625
48 50
659 629 669
698
741
712
5:00 PM6:00 PM
1 2 or More
R
3:00 PM4:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r r;;
r r;;
r r;;
I /
r r;;
r r;;
I V
r r;;
--~I I r ~ I
1753
2:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Existing Traffic Conditions
10. Pinkham Street / Caldwell Avenue
712
66 56 48
(Higher Volume Approach)
669
59 Major Street
(Total of Both Approaches)
Minor Street
741 698
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 ;;==t:=~===~:r=:::::-::--=il :::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1754
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Existing Traffic Conditions
10. Pinkham Street / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Pinkham
Street
Highest
Approach
Volume =
64 (55) VPH
Caldwell Avenue Total of Both Approaches =
629 (719) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400 2 lR JE LA1 & 21 MJ LANEl
2 oJ MOREi LANESI & 1 LA~E
300
200
100 ----+---+--+---t-------t--=,._____=:1----+===--=±===-----11----- 100· 300
JlB !!Af.f.!S.
- - -
~ -+- - ---1--= ....... -- 75•
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1755
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
MA
11/24/25
11/24/25
10/28/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Existing Traffic Conditions
Road 148
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
3:00 PM
U R
7:00 AM12:00 PM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
Major Street (480) 554
420 604
758
500 350
(400) 559
600 530 559 613 758 705 693
1 150 200 140 35
35 23 80
23 73 30
Highest Approach 80
(80% SHOWN IN BRACKETS)
705
62 (336) 613 693
554
(280)
Minor Street
58 24
(84) (160) (112) 58 62 24
530 604
MINIMUM REQUIREMENTS
(120)
105 73 30
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
758
Major Street
Highest Approach
(420)
35 23 80 58
705
APPROACH LANES
Both Approaches 525 900 630 530 613 604
U
(600) (720) (504) 530
7:00 AM12:00 PM1:00 PM2:00 PM
U R
750 559
2. INTERRUPTION OF CONTINUOUS TRAFFIC
80 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 73 30 35 23
73 30
Yes
(60) (56) 58
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
554
62 24
693 554
62 24
559 613 604
705
758
693
5:00 PM6:00 PM
1 2 or More
R
3:00 PM4:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
r P
I V
r P
--~I I r ~ I
1756
1:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/24/25
MA 11/24/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Existing Traffic Conditions
12. Road 148 / Caldwell Avenue
693
80 58 62
(Higher Volume Approach)
613
35 Major Street
(Total of Both Approaches)
Minor Street
758 705
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 =t==~~~====j1:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1757
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Existing Traffic Conditions
12. Road 148 / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Road 148
Highest
Approach
Volume =
129 (67) VPH
Caldwell Avenue Total of Both Approaches =
636 (690) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
2 lR JE LA1 & 21 MJ LANEl
2 oJ MOREi LANESI & 1 LA~E
----+---+--+---t-------t--=,._____=:1----+===--=±===-----11----- 100· ~ -+- - ---1--= ....... -- 75•
300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!Af.f.!S.
- - -
1758
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Pinkham Street
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/05/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Opening Year No Project Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
186
(280)
Minor Street
161 104
(84) (160) (112) 161 165 104
325 305
MINIMUM REQUIREMENTS
(120)
105 157 113
Both Approaches
256
165
(336) 187 280
(80% SHOWN IN BRACKETS)
150 200 140 93
93 126 135
126
157 113
Highest Approach 135
Major Street (480) 186
420 305
244
500 350
(400) 218
600 325 218 187 244 256 280
1 U R
7:00 AM8:00 AM12:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM12:00 AM
TWO WARRANTS SATISFIED
80%
186
165 104
280 186
165 104
218 187 305
256
244
280
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
135
75 53 100 70
REQUIREMENT
Minor Street (42) (80) 157 113 93 126
157 113
Yes
(60) (56) 161
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 187 305
U
(600) (720) (504) 325
7:00 AM8:00 AM12:00 PM2:00 PM
U R
750 218 244
Major Street
Highest Approach
(420)
93 126 135 161
256
APPROACH LANES
Both Approaches 325
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
r P
I V
r P
--~I I r ~ I
1759
7:00 AM 2:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/05/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2. Pinkham Street / K Avenue
280
126 161 165
(Higher Volume Approach)
325
157
Major Street
(Total of Both Approaches)
Minor Street
305 256
Warrant 2: Four-Hour Vehicular Volume (Rural)
Opening Year No Project Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 --
.---=--=-t=-"':.~~l====jj:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r.' r r
r
JLB!!Af.US. - - - - ----
•
1760
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Opening Year No Project Traffic Conditions
2. Pinkham Street / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
179 (163) VPH
Pinkham Street Total of Both Approaches =
400 (301) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
* ----+---+--+---t-------t-=- -=:±-------t====-----=E=-----11----- 100* ~ ---+-- ---l-----===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1761
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Lovers Lane
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Opening Year No Project Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
640
(280)
Minor Street
96 80
(84) (160) (112) 96 105 80
910 860
MINIMUM REQUIREMENTS
(120)
105 94 63
Both Approaches
971
105
(336) 724 972
(80% SHOWN IN BRACKETS)
150 200 140 49
49 67 90
67 94 63
Highest Approach 90
Major Street (480) 640
420 860
953
500 350
(400) 783
600 910 783 724 953 971 972
1 U R
7:00 AM8:00 AM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM4:00 PM
TWO WARRANTS SATISFIED
80%
640
105 80
972 640
105 80
783 724 860
971
953
972
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
90 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 94 63 49 67
94 63
Yes
(60) (56) 96
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 724 860
U
(600) (720) (504) 910
7:00 AM8:00 AM1:00 PM2:00 PM
U R
750 783 953
Major Street
Highest Approach
(420)
49 67 90 96
971
APPROACH LANES
Both Approaches 910
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
P r
I V
r P
--~I I r ~ I
1762
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
3. Lovers Lane / K Avenue
972
90 96 105
(Higher Volume Approach)
910
94 Major Street
(Total of Both Approaches)
Minor Street
953 971
Warrant 2: Four-Hour Vehicular Volume (Rural)
Opening Year No Project Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR J ORE JNES & l LANE
1 JNE & 1
1 LANE
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r rv r
r
JLB!!Af.US. - - - - ----
•
1763
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Opening Year No Project Traffic Conditions
3. Lovers Lane / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
104 (71) VPH
Lovers Lane Total of Both Approaches =
1039 (1047) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+---t-------t-=- -=:±-------F..1~---=E=-----11----- 100* ~ ---t11.,-+---===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1764
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Opening Year No Project Traffic Conditions
Lovers Lane
Sunnyside Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
2:00 PM
U R
7:00 AM8:00 AM12:00 PM3:00 PM4:00 PM
2 or More 1:00 PM
5:00 PM
Major Street (480) 943
420 699
846
500 350
(400) 760
600 901 760 634 846 937 959
1 150 200 140 26
26 27 32
27 75 30
Highest Approach 32
(80% SHOWN IN BRACKETS)
937
31 (336) 634 959
943
(280)
Minor Street
30 34
(84) (160) (112) 30 31 34
901 699
MINIMUM REQUIREMENTS
(120)
105 75 30
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
846
Major Street
Highest Approach
(420)
26 27 32 30
937
APPROACH LANES
Both Approaches 525 900 630 901 634 699
U
(600) (720) (504) 901
7:00 AM8:00 AM12:00 PM1:00 PM
U R
750 760
2. INTERRUPTION OF CONTINUOUS TRAFFIC
32 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 75 30 26 27
75 30
Yes
(60) (56) 30
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
943
31 34
959 943
31 34
760 634 699
937
846
959
4:00 PM5:00 PM
1 2 or More
R
2:00 PM12:00 AM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r r;;
r r;;
r r;;
I /
r r;;
r r;;
I V
r r;;
--~I I r ~ I
1765
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
5. Lovers Lane / Sunnyside Avenue
943
30 31 34
(Higher Volume Approach)
901
75 Major Street
(Total of Both Approaches)
Minor Street
937 959
Warrant 2: Four-Hour Vehicular Volume (Rural)
Opening Year No Project Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 ~---=---:.++_~"':_~~~'1'..,_ r·===~1:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r rv r
r
JLB!!Af.US. - - - - ----
•
1766
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Opening Year No Project Traffic Conditions
5. Lovers Lane / Sunnyside Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Sunnyside
Avenue
Highest
Approach
Volume =
72 (36) VPH
Lovers Lane Total of Both Approaches =
1042 (1028) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+---t-------t-=- -=:±-------t====-----=E=-----11----- 100* ~ ---+~~---l-----===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1767
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Opening Year No Project Traffic Conditions
Pinkham Street
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
2:00 PM
U R
11:00 AM12:00 PM1:00 PM3:00 PM4:00 PM
2 or More 1:00 PM
5:00 PM
Major Street (480) 761
420 673
716
500 350
(400) 705
600 688 705 673 716 793 746
1 150 200 140 45
45 45 59
45 38 38
Highest Approach 59
(80% SHOWN IN BRACKETS)
793
56 (336) 673 746
761
(280)
Minor Street
66 48
(84) (160) (112) 66 56 48
688 673
MINIMUM REQUIREMENTS
(120)
105 38 38
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
716
Major Street
Highest Approach
(420)
45 45 59 66
793
APPROACH LANES
Both Approaches 525 900 630 688 673 673
U
(600) (720) (504) 688
11:00 AM12:00 PM1:00 PM1:00 PM
U R
750 705
2. INTERRUPTION OF CONTINUOUS TRAFFIC
59 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 38 38 45 45
38 38
Yes
(60) (56) 66
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
761
56 48
746 761
56 48
705 673 673
793
716
746
4:00 PM5:00 PM
1 2 or More
R
2:00 PM3:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r r;;
r r;;
r r;;
I /
r r;;
r r;;
I V
r r;;
--~I I r ~ I
1768
2:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Opening Year No Project Traffic Conditions
10. Pinkham Street / Caldwell Avenue
761
66 56 48
(Higher Volume Approach)
716
59 Major Street
(Total of Both Approaches)
Minor Street
793 746
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 IAl ~.,t- -_-==_~~,~~-- -1~ :::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1769
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Opening Year No Project Traffic Conditions
10. Pinkham Street / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Pinkham
Street
Highest
Approach
Volume =
74 (66) VPH
Caldwell Avenue Total of Both Approaches =
679 (782) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+------.ch-t-------t-=- -=:±-------t====-----=E=-----11----- 100* ~ ---+-- ---l-----===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1770
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
MA
11/24/25
11/24/25
10/28/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Opening Year No Project Traffic Conditions
Road 148
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
2:00 PM
U R
7:00 AM8:00 AM12:00 PM3:00 PM4:00 PM
2 or More 1:00 PM
5:00 PM
Major Street (480) 732
420 648
638
500 350
(400) 533
600 560 533 590 638 801 745
1 150 200 140 38
38 45 30
45 96 83
Highest Approach 30
(80% SHOWN IN BRACKETS)
801
76 (336) 590 745
732
(280)
Minor Street
105 81
(84) (160) (112) 105 76 81
560 648
MINIMUM REQUIREMENTS
(120)
105 96 83
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
638
Major Street
Highest Approach
(420)
38 45 30 105
801
APPROACH LANES
Both Approaches 525 900 630 560 590 648
U
(600) (720) (504) 560
7:00 AM8:00 AM12:00 PM1:00 PM
U R
750 533
2. INTERRUPTION OF CONTINUOUS TRAFFIC
30 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 96 83 38 45
96 83
Yes
(60) (56) 105
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
732
76 81
745 732
76 81
533 590 648
801
638
745
4:00 PM5:00 PM
1 2 or More
R
2:00 PM3:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
r P
I V
r P
--~I I r ~ I
1771
1:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/24/25
MA 11/24/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Opening Year No Project Traffic Conditions
12. Road 148 / Caldwell Avenue
732
105 76 81
(Higher Volume Approach)
648
45 Major Street
(Total of Both Approaches)
Minor Street
801 745
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR J ORE JNES & l LANE
1 JNE & 1
1 LANE
:::;.....=::="'-;------; 80* I 60*
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1772
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Opening Year No Project Traffic Conditions
12. Road 148 / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Road 148
Highest
Approach
Volume =
140 (82) VPH
Caldwell Avenue Total of Both Approaches =
682 (724) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+---t--t------t-=- -=:±-------t====-----=E=-----11----- 100* ~ ---+-- ---l-----===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1773
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Pinkham Street
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/05/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Opening Year plus Phase 1 Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
200
(280)
Minor Street
169 111
(84) (160) (112) 169 152 111
332 312
MINIMUM REQUIREMENTS
(120)
105 157 117
Both Approaches
270
152
(336) 193 289
(80% SHOWN IN BRACKETS)
150 200 140 93
93 126 143
126
157 117
Highest Approach 143
Major Street (480) 200
420 312
260
500 350
(400) 225
600 332 225 193 260 270 289
1 U R
7:00 AM8:00 AM12:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM12:00 AM
TWO WARRANTS SATISFIED
80%
200
152 111
289 200
152 111
225 193 312
270
260
289
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
143
75 53 100 70
REQUIREMENT
Minor Street (42) (80) 157 117 93 126
157 117
Yes
(60) (56) 169
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 193 312
U
(600) (720) (504) 332
7:00 AM8:00 AM12:00 PM2:00 PM
U R
750 225 260
Major Street
Highest Approach
(420)
93 126 143 169
270
APPROACH LANES
Both Approaches 332
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
r P
I V
r P
--~I I r ~ I
1774
7:00 AM 2:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/05/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2. Pinkham Street / K Avenue
289
126 169 152
(Higher Volume Approach)
332
157
Major Street
(Total of Both Approaches)
Minor Street
312 270
Warrant 2: Four-Hour Vehicular Volume (Rural)
Opening Year plus Phase 1 Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ---
.---=--=-t=-"':.~~l====jj:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r.' r r
r
JLB!!Af.US. - - - - ----
•
1775
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Opening Year plus Phase 1 Traffic Conditions
2. Pinkham Street / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
179 (163) VPH
Pinkham Street Total of Both Approaches =
415 (304) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
* ----+---+--+---t-------t-=- -=:±-------t====-----=E=-----11----- 100* ~ ---+-- ---l-----===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1776
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Lovers Lane
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Opening Year plus Phase 1 Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
750
(280)
Minor Street
98 82
(84) (160) (112) 98 107 82
1019 967
MINIMUM REQUIREMENTS
(120)
105 95 64
Both Approaches
1112
107
(336) 815 1100
(80% SHOWN IN BRACKETS)
150 200 140 50
50 68 92
68 95 64
Highest Approach 92
Major Street (480) 750
420 967
1074
500 350
(400) 883
600 1019 883 815 1074 1112 1100
1 U R
7:00 AM8:00 AM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM4:00 PM
TWO WARRANTS SATISFIED
80%
750
107 82
1100 750
107 82
883 815 967
1112
1074
1100
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
92 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 95 64 50 68
95 64
Yes
(60) (56) 98
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 815 967
U
(600) (720) (504) 1019
7:00 AM8:00 AM1:00 PM2:00 PM
U R
750 883 1074
Major Street
Highest Approach
(420)
50 68 92 98
1112
APPROACH LANES
Both Approaches 1019
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
P r
I V
r P
--~I I r ~ I
1777
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
3. Lovers Lane / K Avenue
1100
92 98 107
(Higher Volume Approach)
1019
95 Major Street
(Total of Both Approaches)
Minor Street
1074 1112
Warrant 2: Four-Hour Vehicular Volume (Rural)
Opening Year plus Phase 1 Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR J ORE JNES & l LANE
1 JNE & 1
1 LANE
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r rv r
r
JLB!!Af.US. - - - - ----
•
1778
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Opening Year plus Phase 1 Traffic Conditions
3. Lovers Lane / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
107 (72) VPH
Lovers Lane Total of Both Approaches =
1165 (1209) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+---t-------t-=- -=:±-------t====-----=E~~I-:---- 100* ~ ---t-- +---====...,. __ 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1779
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Opening Year plus Phase 1 Traffic Conditions
Lovers Lane
Sunnyside Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
3:00 PM
U R
7:00 AM8:00 AM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
Major Street (480) 709
420 937
1041
500 350
(400) 845
600 994 845 777 1041 1079 1052
1 150 200 140 63
63 74 84
74 75 69
Highest Approach 84
(80% SHOWN IN BRACKETS)
1079
88 (336) 777 1052
709
(280)
Minor Street
97 77
(84) (160) (112) 97 88 77
994 937
MINIMUM REQUIREMENTS
(120)
105 75 69
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
1041
Major Street
Highest Approach
(420)
63 74 84 97
1079
APPROACH LANES
Both Approaches 525 900 630 994 777 937
U
(600) (720) (504) 994
7:00 AM8:00 AM1:00 PM2:00 PM
U R
750 845
2. INTERRUPTION OF CONTINUOUS TRAFFIC
84 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 75 69 63 74
75 69
Yes
(60) (56) 97
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
709
88 77
1052 709
88 77
845 777 937
1079
1041
1052
5:00 PM6:00 PM
1 2 or More
R
3:00 PM12:00 AM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
P r
r P
r P
I /
P r
P r
I V
r P
--~I I r ~ I
1780
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
5. Lovers Lane / Sunnyside Avenue
1052
84 97 88
(Higher Volume Approach)
994
75 Major Street
(Total of Both Approaches)
Minor Street
1041 1079
Warrant 2: Four-Hour Vehicular Volume (Rural)
Opening Year plus Phase 1 Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR J ORE JNES & l LANE
1 JNE & 1
1 LANE
100 --+---+--+----=:,,..,..,_±-----=-1=::--....:::;,--=---t-----1 80-· I 60
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r rv r
r
JLB!!Af.US. - - - - ----
•
1781
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Opening Year plus Phase 1 Traffic Conditions
5. Lovers Lane / Sunnyside Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Sunnyside
Avenue
Highest
Approach
Volume =
117 (82) VPH
Lovers Lane Total of Both Approaches =
1121 (1195) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
300
JlB !!&.f.E!s. - - - -
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1782
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Opening Year plus Phase 1 Traffic Conditions
Pinkham Street
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
2:00 PM
U R
11:00 AM11:00 AM12:00 PM3:00 PM4:00 PM
2 or More 1:00 PM
5:00 PM
Major Street (480) 796
420 698
745
500 350
(400) 711
600 711 711 729 745 826 785
1 150 200 140 42
42 49 64
49 42 42
Highest Approach 64
(80% SHOWN IN BRACKETS)
826
63 (336) 729 785
796
(280)
Minor Street
72 54
(84) (160) (112) 72 63 54
711 698
MINIMUM REQUIREMENTS
(120)
105 42 42
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
745
Major Street
Highest Approach
(420)
42 49 64 72
826
APPROACH LANES
Both Approaches 525 900 630 711 729 698
U
(600) (720) (504) 711
11:00 AM11:00 AM12:00 PM1:00 PM
U R
750 711
2. INTERRUPTION OF CONTINUOUS TRAFFIC
64 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 42 42 42 49
42 42
Yes
(60) (56) 72
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
796
63 54
785 796
63 54
711 729 698
826
745
785
4:00 PM5:00 PM
1 2 or More
R
2:00 PM3:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r r;;
r r;;
r r;;
I /
r r;;
r;; r
I V
r r;;
--~I I r ~ I
1783
2:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Opening Year plus Phase 1 Traffic Conditions
10. Pinkham Street / Caldwell Avenue
796
72 63 54
(Higher Volume Approach)
745
64 Major Street
(Total of Both Approaches)
Minor Street
826 785
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 ==~~t::===j1 ::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1784
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Opening Year plus Phase 1 Traffic Conditions
10. Pinkham Street / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Pinkham
Street
Highest
Approach
Volume =
86 (68) VPH
Caldwell Avenue Total of Both Approaches =
710 (830) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+--------'l~-----t-=- -=:±-------t====-----=E=-----11----- 100* ~ ---+-- ---l-----===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1785
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
MA
11/24/25
11/24/25
10/28/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Opening Year plus Phase 1 Traffic Conditions
Road 148
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
2:00 PM
U R
7:00 AM8:00 AM12:00 PM3:00 PM4:00 PM
2 or More 1:00 PM
5:00 PM
Major Street (480) 737
420 651
642
500 350
(400) 537
600 564 537 593 642 806 750
1 150 200 140 38
38 45 30
45 96 83
Highest Approach 30
(80% SHOWN IN BRACKETS)
806
76 (336) 593 750
737
(280)
Minor Street
105 81
(84) (160) (112) 105 76 81
564 651
MINIMUM REQUIREMENTS
(120)
105 96 83
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
642
Major Street
Highest Approach
(420)
38 45 30 105
806
APPROACH LANES
Both Approaches 525 900 630 564 593 651
U
(600) (720) (504) 564
7:00 AM8:00 AM12:00 PM1:00 PM
U R
750 537
2. INTERRUPTION OF CONTINUOUS TRAFFIC
30 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 96 83 38 45
96 83
Yes
(60) (56) 105
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
737
76 81
750 737
76 81
537 593 651
806
642
750
4:00 PM5:00 PM
1 2 or More
R
2:00 PM3:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
r P
I V
r P
--~I I r ~ I
1786
1:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/24/25
MA 11/24/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Opening Year plus Phase 1 Traffic Conditions
12. Road 148 / Caldwell Avenue
737
105 76 81
(Higher Volume Approach)
651
45 Major Street
(Total of Both Approaches)
Minor Street
806 750
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR J ORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-1<:::::::-----"
::::;;....=::="'-;------; 80* I 60*
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1787
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Opening Year plus Phase 1 Traffic Conditions
12. Road 148 / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Road 148
Highest
Approach
Volume =
140 (82) VPH
Caldwell Avenue Total of Both Approaches =
695 (736) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400 1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
300
200
100 ----+---+--+---Ht------t-=- -=:±-------t====-----=E=-----11----- 100* 300
JlB !!&.f.E!s. - - - -
~ ---+-- ---l-----===1---- 75•
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1788
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Pinkham Street
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/05/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year No Project Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
190
(280)
Minor Street
167 105
(84) (160) (112) 167 171 105
330 310
MINIMUM REQUIREMENTS
(120)
105 163 118
Both Approaches
260
171
(336) 190 284
(80% SHOWN IN BRACKETS)
150 200 140 96
96 130 137
130
163 118
Highest Approach 137
Major Street (480) 190
420 310
251
500 350
(400) 222
600 330 222 190 251 260 284
1 U R
7:00 AM8:00 AM12:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM12:00 AM
TWO WARRANTS SATISFIED
80%
190
171 105
284 190
171 105
222 190 310
260
251
284
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
137
75 53 100 70
REQUIREMENT
Minor Street (42) (80) 163 118 96 130
163 118
Yes
(60) (56) 167
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 190 310
U
(600) (720) (504) 330
7:00 AM8:00 AM12:00 PM2:00 PM
U R
750 222 251
Major Street
Highest Approach
(420)
96 130 137 167
260
APPROACH LANES
Both Approaches 330
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
r P
I V
r P
--~I I r ~ I
1789
7:00 AM 2:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/05/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2. Pinkham Street / K Avenue
284
130 167 171
(Higher Volume Approach)
330
163
Major Street
(Total of Both Approaches)
Minor Street
310 260
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year No Project Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ------,==----+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 .---=--=-t=-"':.~~l====jj:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r.' r r
r
JLB!!Af.US. - - - - ----
•
1790
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year No Project Traffic Conditions
2. Pinkham Street / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
182 (168) VPH
Pinkham Street Total of Both Approaches =
437 (343) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
* ----+---+--+---t-------t-=- -=:±-------t====-----=E=-----11----- 100* ~ ---+-- ---l-----===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1791
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Lovers Lane
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year No Project Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
669
(280)
Minor Street
97 80
(84) (160) (112) 97 106 80
952 900
MINIMUM REQUIREMENTS
(120)
105 95 64
Both Approaches
1015
106
(336) 757 1016
(80% SHOWN IN BRACKETS)
150 200 140 50
50 68 91
68 95 64
Highest Approach 91
Major Street (480) 669
420 900
996
500 350
(400) 819
600 952 819 757 996 1015 1016
1 U R
7:00 AM8:00 AM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM4:00 PM
TWO WARRANTS SATISFIED
80%
669
106 80
1016 669
106 80
819 757 900
1015
996
1016
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
91 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 95 64 50 68
95 64
Yes
(60) (56) 97
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 757 900
U
(600) (720) (504) 952
7:00 AM8:00 AM1:00 PM2:00 PM
U R
750 819 996
Major Street
Highest Approach
(420)
50 68 91 97
1015
APPROACH LANES
Both Approaches 952
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
P r
I V
r P
--~I I r ~ I
1792
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
3. Lovers Lane / K Avenue
1016
91 97 106
(Higher Volume Approach)
952
95 Major Street
(Total of Both Approaches)
Minor Street
996 1015
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year No Project Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR J ORE JNES & l LANE
1 JNE & 1
1 LANE
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r rv r
r
JLB!!Af.US. - - - - ----
•
•
1793
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year No Project Traffic Conditions
3. Lovers Lane / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
106 (73) VPH
Lovers Lane Total of Both Approaches =
1133 (1138) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+---t-------t-=- -=:±-------t====-----=£).~----11----- 100* ~ ---t-- + ,A,;:::::::=1--- 75•
300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1794
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year No Project Traffic Conditions
Lovers Lane
Sunnyside Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
2:00 PM
U R
7:00 AM8:00 AM12:00 PM3:00 PM4:00 PM
2 or More 1:00 PM
5:00 PM
Major Street (480) 989
420 733
888
500 350
(400) 797
600 945 797 664 888 982 1005
1 150 200 140 27
27 28 33
28 77 31
Highest Approach 33
(80% SHOWN IN BRACKETS)
982
32 (336) 664 1005
989
(280)
Minor Street
31 34
(84) (160) (112) 31 32 34
945 733
MINIMUM REQUIREMENTS
(120)
105 77 31
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
888
Major Street
Highest Approach
(420)
27 28 33 31
982
APPROACH LANES
Both Approaches 525 900 630 945 664 733
U
(600) (720) (504) 945
7:00 AM8:00 AM12:00 PM1:00 PM
U R
750 797
2. INTERRUPTION OF CONTINUOUS TRAFFIC
33 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 77 31 27 28
77 31
Yes
(60) (56) 31
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
989
32 34
1005 989
32 34
797 664 733
982
888
1005
4:00 PM5:00 PM
1 2 or More
R
2:00 PM12:00 AM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r r;;
r r;;
r r;;
I /
r r;;
r r;;
I V
r r;;
--~I I r ~ I
1795
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year No Project Traffic Conditions
5. Lovers Lane / Sunnyside Avenue
989
31 32 34
(Higher Volume Approach)
945
77 Major Street
(Total of Both Approaches)
Minor Street
982 1005
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 -1-----=:j:::::::::'=~:::llli;:=j 80* It} 60* .
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r P' r
r
JLB!!Af.US. - - - - ----
•
1796
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year No Project Traffic Conditions
5. Lovers Lane / Sunnyside Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Sunnyside
Avenue
Highest
Approach
Volume =
72 (38) VPH
Lovers Lane Total of Both Approaches =
1138 (1121) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+---t-------t-=- -=:±-------t====-----=E':"-----II----- 100* ~ ---t-- ----l-,)"'(;::::::::=!--- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1797
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year No Project Traffic Conditions
Pinkham Street
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
3:00 PM
U R
11:00 AM12:00 PM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
Major Street (480) 741
420 793
879
500 350
(400) 781
600 764 781 745 879 828 844
1 150 200 140 46
46 60 67
60 39 39
Highest Approach 67
(80% SHOWN IN BRACKETS)
828
49 (336) 745 844
741
(280)
Minor Street
57 51
(84) (160) (112) 57 49 51
764 793
MINIMUM REQUIREMENTS
(120)
105 39 39
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
879
Major Street
Highest Approach
(420)
46 60 67 57
828
APPROACH LANES
Both Approaches 525 900 630 764 745 793
U
(600) (720) (504) 764
11:00 AM12:00 PM1:00 PM2:00 PM
U R
750 781
2. INTERRUPTION OF CONTINUOUS TRAFFIC
67 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 39 39 46 60
39 39
Yes
(60) (56) 57
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
741
49 51
844 741
49 51
781 745 793
828
879
844
5:00 PM6:00 PM
1 2 or More
R
3:00 PM4:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r r;;
r r;;
r r;;
I /
r r;;
r r;;
I V
r r;;
--~I I r ~ I
1798
2:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year No Project Traffic Conditions
10. Pinkham Street / Caldwell Avenue
844
67 57 49
(Higher Volume Approach)
793
60 Major Street
(Total of Both Approaches)
Minor Street
879 828
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR J ORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 +-----: 80* I 60*
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1799
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year No Project Traffic Conditions
10. Pinkham Street / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Pinkham
Street
Highest
Approach
Volume =
90 (85) VPH
Caldwell Avenue Total of Both Approaches =
761 (888) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
300
JlB !!&.f.E!s. - - - -
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1800
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
MA
11/24/25
11/24/25
10/28/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year No Project Traffic Conditions
Road 148
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
2:00 PM
U R
7:00 AM8:00 AM12:00 PM3:00 PM4:00 PM
2 or More 1:00 PM
5:00 PM
Major Street (480) 797
420 705
695
500 350
(400) 581
600 610 581 643 695 872 811
1 150 200 140 52
52 61 42
61 133 115
Highest Approach 42
(80% SHOWN IN BRACKETS)
872
106
(336) 643 811
797
(280)
Minor Street
146 113
(84) (160) (112) 146 106 113
610 705
MINIMUM REQUIREMENTS
(120)
105 133 115
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
695
Major Street
Highest Approach
(420)
52 61 42 146
872
APPROACH LANES
Both Approaches 525 900 630 610 643 705
U
(600) (720) (504) 610
7:00 AM8:00 AM12:00 PM1:00 PM
U R
750 581
2. INTERRUPTION OF CONTINUOUS TRAFFIC
42 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 133 115 52 61
133 115
Yes
(60) (56) 146
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
797
106 113
811 797
106 113
581 643 705
872
695
811
4:00 PM5:00 PM
1 2 or More
R
2:00 PM3:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
P r
I V
r P
--~I I r ~ I
1801
1:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/24/25
MA 11/24/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year No Project Traffic Conditions
12. Road 148 / Caldwell Avenue
797
146 106 113
(Higher Volume Approach)
705
61 Major Street
(Total of Both Approaches)
Minor Street
872 811
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-l<:=------"'11 l<:::-+-------l ~ --=--=-t=-"':.~~l====j
I
:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1802
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year No Project Traffic Conditions
12. Road 148 / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Road 148
Highest
Approach
Volume =
160 (115) VPH
Caldwell Avenue Total of Both Approaches =
758 (779) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+--+--+---l--~ 11".'.1= - -=:±---=i=:===-----=£==-----11----- 100* ~ ---+-- ---l-----===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1803
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Pinkham Street
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/05/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year plus Phase 1 Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
204
(280)
Minor Street
171 112
(84) (160) (112) 171 154 112
337 317
MINIMUM REQUIREMENTS
(120)
105 163 120
Both Approaches
277
154
(336) 196 296
(80% SHOWN IN BRACKETS)
150 200 140 96
96 130 145
130
163 120
Highest Approach 145
Major Street (480) 204
420 317
267
500 350
(400) 231
600 337 231 196 267 277 296
1 U R
7:00 AM8:00 AM12:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM12:00 AM
TWO WARRANTS SATISFIED
80%
204
154 112
296 204
154 112
231 196 317
277
267
296
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
145
75 53 100 70
REQUIREMENT
Minor Street (42) (80) 163 120 96 130
163 120
Yes
(60) (56) 171
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 196 317
U
(600) (720) (504) 337
7:00 AM8:00 AM12:00 PM2:00 PM
U R
750 231 267
Major Street
Highest Approach
(420)
96 130 145 171
277
APPROACH LANES
Both Approaches 337
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
r P
I V
r P
--~I I r ~ I
1804
7:00 AM 2:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/05/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2. Pinkham Street / K Avenue
296
130 171 154
(Higher Volume Approach)
337
163
Major Street
(Total of Both Approaches)
Minor Street
317 277
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year plus Phase 1 Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 -----f=----+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 .---=--=-t=-"':.~~l====jj:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r.' r r
r
JLB!!Af.US. - - - - ----
•
1805
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year plus Phase 1 Traffic Conditions
2. Pinkham Street / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
182 (168) VPH
Pinkham Street Total of Both Approaches =
452 (346) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
* ----+---+--+---t-------t-=- -=:±-------t====-----=E=-----11----- 100* ~ ---+-- ---l-----===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1806
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Lovers Lane
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year plus Phase 1 Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
779
(280)
Minor Street
99 82
(84) (160) (112) 99 108 82
1061 1007
MINIMUM REQUIREMENTS
(120)
105 96 65
Both Approaches
1156
108
(336) 848 1144
(80% SHOWN IN BRACKETS)
150 200 140 51
51 69 93
69 96 65
Highest Approach 93
Major Street (480) 779
420 1007
1117
500 350
(400) 919
600 1061 919 848 1117 1156 1144
1 U R
7:00 AM8:00 AM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM4:00 PM
TWO WARRANTS SATISFIED
80%
779
108 82
1144 779
108 82
919 848 1007
1156
1117
1144
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
93 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 96 65 51 69
96 65
Yes
(60) (56) 99
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 848 1007
U
(600) (720) (504) 1061
7:00 AM8:00 AM1:00 PM2:00 PM
U R
750 919 1117
Major Street
Highest Approach
(420)
51 69 93 99
1156
APPROACH LANES
Both Approaches 1061
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
P r
I V
r P
--~I I r ~ I
1807
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
3. Lovers Lane / K Avenue
1144
93 99 108
(Higher Volume Approach)
1061
96 Major Street
(Total of Both Approaches)
Minor Street
1117 1156
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year plus Phase 1 Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
mo ----+---+---t-----=-d------=::,...7:=:_-=_=_....::: -:_++--=-:_-~;==_,lr:=_--=-=-=~_, aiA..
I 60·
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r rv r
r
•
JLB!!Af.US. - - - - ----
1808
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year plus Phase 1 Traffic Conditions
3. Lovers Lane / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
109 (74) VPH
Lovers Lane Total of Both Approaches =
1259 (1300) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
300
JlB !!&.f.E!s. - - - -
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1809
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year plus Phase 1 Traffic Conditions
Lovers Lane
Sunnyside Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
3:00 PM
U R
7:00 AM8:00 AM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
Major Street (480) 738
420 979
1086
500 350
(400) 882
600 1038 882 811 1086 1125 1098
1 150 200 140 63
63 74 84
74 77 69
Highest Approach 84
(80% SHOWN IN BRACKETS)
1125
88 (336) 811 1098
738
(280)
Minor Street
97 77
(84) (160) (112) 97 88 77
1038 979
MINIMUM REQUIREMENTS
(120)
105 77 69
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
1086
Major Street
Highest Approach
(420)
63 74 84 97
1125
APPROACH LANES
Both Approaches 525 900 630 1038 811 979
U
(600) (720) (504) 1038
7:00 AM8:00 AM1:00 PM2:00 PM
U R
750 882
2. INTERRUPTION OF CONTINUOUS TRAFFIC
84 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 77 69 63 74
77 69
Yes
(60) (56) 97
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
738
88 77
1098 738
88 77
882 811 979
1125
1086
1098
5:00 PM6:00 PM
1 2 or More
R
3:00 PM12:00 AM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
P r
r P
r P
I /
P r
P r
I V
r P
--~I I r ~ I
1810
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year plus Phase 1 Traffic Conditions
5. Lovers Lane / Sunnyside Avenue
1098
84 97 88
(Higher Volume Approach)
1038
77 Major Street
(Total of Both Approaches)
Minor Street
1086 1125
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR J ORE JNES & l LANE
1 JNE & 1
1 LANE
100 --+--+----+-----=-..-:±--------=--+,=--....::::;,-...,:::----t----l _. 200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r P' r
r
JLB!!Af.US. - - - - ----
•
1811
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year plus Phase 1 Traffic Conditions
5. Lovers Lane / Sunnyside Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Sunnyside
Avenue
Highest
Approach
Volume =
117 (82) VPH
Lovers Lane Total of Both Approaches =
1217 (1288) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+---t-------t-=- -=:±-------t====-----=E=-------'lM'-------.-- 100* ~ ---+-- ---l-----===j..:...____:W' 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1812
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year plus Phase 1 Traffic Conditions
Pinkham Street
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
3:00 PM
U R
11:00 AM12:00 PM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
Major Street (480) 771
420 822
912
500 350
(400) 805
600 787 805 770 912 867 879
1 150 200 140 50
50 65 73
65 43 43
Highest Approach 73
(80% SHOWN IN BRACKETS)
867
55 (336) 770 879
771
(280)
Minor Street
64 56
(84) (160) (112) 64 55 56
787 822
MINIMUM REQUIREMENTS
(120)
105 43 43
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
912
Major Street
Highest Approach
(420)
50 65 73 64
867
APPROACH LANES
Both Approaches 525 900 630 787 770 822
U
(600) (720) (504) 787
11:00 AM12:00 PM1:00 PM2:00 PM
U R
750 805
2. INTERRUPTION OF CONTINUOUS TRAFFIC
73 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 43 43 50 65
43 43
Yes
(60) (56) 64
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
771
55 56
879 771
55 56
805 770 822
867
912
879
5:00 PM6:00 PM
1 2 or More
R
3:00 PM4:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r r;;
r r;;
r r;;
I /
r r;;
r;; r
I V
r r;;
--~I I r ~ I
1813
2:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year plus Phase 1 Traffic Conditions
10. Pinkham Street / Caldwell Avenue
879
73 64 55
(Higher Volume Approach)
822
65 Major Street
(Total of Both Approaches)
Minor Street
912 867
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1814
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year plus Phase 1 Traffic Conditions
10. Pinkham Street / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Pinkham
Street
Highest
Approach
Volume =
102 (87) VPH
Caldwell Avenue Total of Both Approaches =
792 (936) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
300
JlB !!&.f.E!s. - - - -
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1815
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
MA
11/24/25
11/24/25
10/28/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year plus Phase 1 Traffic Conditions
Road 148
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
2:00 PM
U R
7:00 AM8:00 AM12:00 PM3:00 PM4:00 PM
2 or More 1:00 PM
5:00 PM
Major Street (480) 802
420 708
699
500 350
(400) 585
600 614 585 646 699 877 816
1 150 200 140 52
52 61 42
61 133 115
Highest Approach 42
(80% SHOWN IN BRACKETS)
877
106
(336) 646 816
802
(280)
Minor Street
146 113
(84) (160) (112) 146 106 113
614 708
MINIMUM REQUIREMENTS
(120)
105 133 115
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
699
Major Street
Highest Approach
(420)
52 61 42 146
877
APPROACH LANES
Both Approaches 525 900 630 614 646 708
U
(600) (720) (504) 614
7:00 AM8:00 AM12:00 PM1:00 PM
U R
750 585
2. INTERRUPTION OF CONTINUOUS TRAFFIC
42 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 133 115 52 61
133 115
Yes
(60) (56) 146
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
802
106 113
816 802
106 113
585 646 708
877
699
816
4:00 PM5:00 PM
1 2 or More
R
2:00 PM3:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
P r
I V
r P
--~I I r ~ I
1816
1:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/24/25
MA 11/24/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year plus Phase 1 Traffic Conditions
12. Road 148 / Caldwell Avenue
802
146 106 113
(Higher Volume Approach)
708
61 Major Street
(Total of Both Approaches)
Minor Street
877 816
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-1<:=-----"" 9:::::--+-----l --.---=--=-t=-"':.~~l====j
I
:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1817
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year plus Phase 1 Traffic Conditions
12. Road 148 / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Road 148
Highest
Approach
Volume =
160 (116) VPH
Caldwell Avenue Total of Both Approaches =
771 (791) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+---t-----:w=--=:±-------t====-----=E=-----11----- 100* ~ ---+-- ---l-----===1---- 75•
300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1818
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
Pinkham Street
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
DCC
DC
11/05/25
11/05/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year plus Buildout Traffic Conditions
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
228
(280)
Minor Street
182 124
(84) (160) (112) 182 167 124
346 325
MINIMUM REQUIREMENTS
(120)
105 163 120
Both Approaches
300
167
(336) 203 323
(80% SHOWN IN BRACKETS)
150 200 140 99
99 130 154
130
163 120
Highest Approach 154
Major Street (480) 228
420 325
285
500 350
(400) 248
600 346 248 203 285 300 323
1 U R
7:00 AM8:00 AM12:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
APPROACH LANES
U R
3:00 PM
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
3:00 PM12:00 AM
TWO WARRANTS SATISFIED
80%
228
167 124
323 228
167 124
248 203 325
300
285
323
5:00 PM6:00 PM
1 2 or More
R
2. INTERRUPTION OF CONTINUOUS TRAFFIC
154
75 53 100 70
REQUIREMENT
Minor Street (42) (80) 163 120 99 130
163 120
Yes
(60) (56) 182
WARRANT FULFILLED
No
1. MINIMUM VEHICULAR VOLUME
525 900 630 203 325
U
(600) (720) (504) 346
7:00 AM8:00 AM12:00 PM2:00 PM
U R
750 248 285
Major Street
Highest Approach
(420)
99 130 154 182
300
APPROACH LANES
Both Approaches 346
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
r P
I V
r P
--~I I r ~ I
1819
7:00 AM 2:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/05/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2. Pinkham Street / K Avenue
323
130 182 167
(Higher Volume Approach)
346
163
Major Street
(Total of Both Approaches)
Minor Street
325 300
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year plus Buildout Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+= --+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 .---=--=-t=-"':.~~l====jj:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r.' r r
r
JLB!!Af.US. - - - - ----
•
1820
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year plus Buildout Traffic Conditions
2. Pinkham Street / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Not Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
213 (168) VPH
Pinkham Street Total of Both Approaches =
470 (349) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
* ----+---+--+---t-------t-=- -=:±-------t====-----=E=-----11----- 100* ~ ---+-- ---l-----===1---- 75• 300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1821
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year plus Buildout Traffic Conditions
Lovers Lane
K Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
3:00 PM U R
7:00 AM
8:00 AM
1:00 PM
4:00 PM
5:00 PM 2 or More 6:00 PM
2:00 PM
Major Street (480) 897
420 1086
1206
350500
(400) 1006
600 1156 1006 914 1206 1269 1281
1 150 200 140 53
53 71 95
71 98 67
Highest Approach 95
(80% SHOWN IN BRACKETS)
1269
111
(336) 914 1281
897
(280)
Minor Street
102 85
(84) (160) (112) 102 111 85
1156 1086
MINIMUM REQUIREMENTS
(120)
105 98 67
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
1206
Major Street
Highest Approach
(420)
53 71 10295
1269
APPROACH LANES
Both Approaches 525 900 630 1156 1086914
U
(600) (720) (504) 1156
7:00 AM
8:00 AM
1:00 PM
2:00 PM U R
750 1006
2. INTERRUPTION OF CONTINUOUS TRAFFIC
95 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 98 67 53 71
98 67
Yes
(60) (56) 102
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
897
85111
1281 897
111 85
1006 914 1086
1269
1206
1281
5:00 PM
6:00 PM 1 2 or More
R
3:00 PM
4:00 PM
1 - - - -
V I I V V
I I I V V
I
I
r;, r
r r;,
r r;,
I /
r;, r
r;, r
I I
r r;,
---ii , ~ I
1822
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
3. Lovers Lane / K Avenue
1281
95 102 111
(Higher Volume Approach)
1156
98 Major Street
(Total of Both Approaches)
Minor Street
1206 1269
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year plus Buildout Traffic Conditions
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ---+--+----+-:::,,..,.,-:±----=-+,,:::::--....::::;,-"""="-+-----l ...... 7 __ -_-_+-+--- =- ==- ~ ::==-t°'I'-- - _- _-~--: aoJIIIIIIII' I 6Q• 200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r rv r
r
JLB!!Af.US. - - - - ----
•
1823
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year plus Buildout Traffic Conditions
3. Lovers Lane / K Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
K Avenue
Highest
Approach
Volume =
113 (75) VPH
Lovers Lane Total of Both Approaches =
1366 (1421) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
300
JlB !!&.f.E!s. - - - -
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1824
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year plus Buildout Traffic Conditions
Lovers Lane
Sunnyside Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
3:00 PM
U R
7:00 AM8:00 AM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
Major Street (480) 822
420 1035
1149
500 350
(400) 943
600 1105 943 858 1149 1205 1194
1 150 200 140 110
110 129 146
129
142 130
Highest Approach 146
(80% SHOWN IN BRACKETS)
1205
185
(336) 858 1194
822
(280)
Minor Street
177 160
(84) (160) (112) 177 185 160
1105 1035
MINIMUM REQUIREMENTS
(120)
105 142 130
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
1149
Major Street
Highest Approach
(420)
110 129 146 177
1205
APPROACH LANES
Both Approaches 525 900 630 1105 858 1035
U
(600) (720) (504) 1105
7:00 AM8:00 AM1:00 PM2:00 PM
U R
750 943
2. INTERRUPTION OF CONTINUOUS TRAFFIC
146
75 53 100 70
REQUIREMENT
Minor Street (42) (80) 142 130 110 129
142 130
Yes
(60) (56) 177
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
822
185 160
1194 822
185 160
943 858 1035
1205
1149
1194
5:00 PM6:00 PM
1 2 or More
R
3:00 PM12:00 AM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
P r
P r
P r
I /
P r
P r
I V
P r
--~I I ~ r I
1825
7:00 AM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year plus Buildout Traffic Conditions
5. Lovers Lane / Sunnyside Avenue
1194
146 177 185
(Higher Volume Approach)
1105
142
Major Street
(Total of Both Approaches)
Minor Street
1149 1205
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-l<:=-----"::;,--.=-----,f------1 .---=--=-t=-"':.~~l====jj:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r P' r
r
JLB!!Af.US. - - - - ----
•
1826
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year plus Buildout Traffic Conditions
5. Lovers Lane / Sunnyside Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Sunnyside
Avenue
Highest
Approach
Volume =
210 (141) VPH
Lovers Lane Total of Both Approaches =
1261 (1414) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
300
JlB !!&.f.E!s. - - - -
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
*
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1827
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
DC
11/05/25
11/07/25
09/09/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year plus Buildout Traffic Conditions
Pinkham Street
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
3:00 PM
U R
11:00 AM12:00 PM1:00 PM4:00 PM5:00 PM
2 or More 2:00 PM
6:00 PM
Major Street (480) 804
420 844
937
500 350
(400) 826
600 806 826 789 937 899 918
1 150 200 140 55
55 71 80
71 48 48
Highest Approach 80
(80% SHOWN IN BRACKETS)
899
65 (336) 789 918
804
(280)
Minor Street
72 65
(84) (160) (112) 72 65 65
806 844
MINIMUM REQUIREMENTS
(120)
105 48 48
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
937
Major Street
Highest Approach
(420)
55 71 80 72
899
APPROACH LANES
Both Approaches 525 900 630 806 789 844
U
(600) (720) (504) 806
11:00 AM12:00 PM1:00 PM2:00 PM
U R
750 826
2. INTERRUPTION OF CONTINUOUS TRAFFIC
80 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 48 48 55 71
48 48
Yes
(60) (56) 72
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
804
65 65
918 804
65 65
826 789 844
899
937
918
5:00 PM6:00 PM
1 2 or More
R
3:00 PM4:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r r;;
r r;;
r r;;
I /
r r;;
r;; r
I V
r r;;
--~I I r ~ I
1828
2:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/05/25
DC 11/07/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year plus Buildout Traffic Conditions
10. Pinkham Street / Caldwell Avenue
918
80 72 65
(Higher Volume Approach)
844
71 Major Street
(Total of Both Approaches)
Minor Street
937 899
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR J ORE JNES & l LANE
1 JNE & 1
1 LANE
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1829
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year plus Buildout Traffic Conditions
10. Pinkham Street / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Pinkham
Street
Highest
Approach
Volume =
116 (89) VPH
Caldwell Avenue Total of Both Approaches =
811 (971) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
300
JlB !!&.f.E!s. - - - -
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane. 1830
California MUTCD 2014 Edition Page 844
(FHWA'S MUTCD 2009 Edition, as amended for use in California) Signal Warrant Analysis
COUNT DATE
CALC DATE
CHK DATE
Major St: Critical Approach Speed 40 MPH
Minor St:
Critical speed of major street traffic > 64 km/h (40 mph)……………… or RURAL (R)
In built up area of isolated community of < 10,000 population ………..
URBAN (U)
WARRANT 1 - Eight Hour Vehicular Volume SATISFIED YES NO (Condition A or Condition B or combination of A and B must be satisfied) Condition A - Minimum Vehicle Volume 100% SATISFIED YES NO 80 % SATISFIED YES NO
DCC
MA
11/24/25
11/24/25
10/28/25
Fresno
Figure 4C-101 (CA). Traffic Signal Warrants Worksheet
006
DIST CO RTE KPM
N/A N/A
Cumulative 5-Year plus Buildout Traffic Conditions
Road 148
Caldwell Avenue
(80% SHOWN IN BRACKETS)
MINIMUM REQUIREMENTS
Hour
Condition B - Interruption of Continuous Traffic 100% SATISFIED YES NO 80 % SATISFIED YES NO
APPROACH LANES
U R
2:00 PM
U R
7:00 AM8:00 AM12:00 PM3:00 PM4:00 PM
2 or More 1:00 PM
5:00 PM
Major Street (480) 807
420 710
702
500 350
(400) 588
600 617 588 649 702 880 820
1 150 200 140 52
52 61 42
61 133 115
Highest Approach 42
(80% SHOWN IN BRACKETS)
880
106
(336) 649 820
807
(280)
Minor Street
146 113
(84) (160) (112) 146 106 113
617 710
MINIMUM REQUIREMENTS
(120)
105 133 115
Both Approaches
Hour
The satisfaction of a traffic signal warrant or warrants shall not in itself require the installation of a traffic control signal.
Combination of Conditions A & B SATISFIED YES NO
www.JLBtraffic.com 516 W. Shaw Ave., Ste. 103
Fresno, CA 93704
[email protected] (559) 570 - 8991
702
Major Street
Highest Approach
(420)
52 61 42 146
880
APPROACH LANES
Both Approaches 525 900 630 617 649 710
U
(600) (720) (504) 617
7:00 AM8:00 AM12:00 PM1:00 PM
U R
750 588
2. INTERRUPTION OF CONTINUOUS TRAFFIC
42 75 53 100 70
REQUIREMENT
Minor Street (42) (80) 133 115 52 61
133 115
Yes
(60) (56) 146
WARRANT FULFILLED
No
TWO WARRANTS SATISFIED 1. MINIMUM VEHICULAR VOLUME
80%
807
106 113
820 807
106 113
588 649 710
880
702
820
4:00 PM5:00 PM
1 2 or More
R
2:00 PM3:00 PM
1 JlBI&&.ms - - - -
V I I V V
V I I V V
V
V
r P
r P
r P
I /
r P
P r
I V
r P
--~I I r ~ I
1831
1:00 PM 3:00 PM 4:00 PM 5:00 PM
Volume Volume Volume Volume
DCC 11/24/25
MA 11/24/25
Part 4: Highway Traffic Signals
November 7, 2014
2 or More
Lanes & 2
or More
Lanes
2 or More
Lanes &
1 Lane
1 Lane
&
1 Lane
Satisfied: Yes No
Chapter 4C: Traffic Control Signal Needs Studies
Warrant 2: Four-Hour Vehicular Volume (Rural)
Cumulative 5-Year plus Buildout Traffic Conditions
12. Road 148 / Caldwell Avenue
807
146 106 113
(Higher Volume Approach)
710
61 Major Street
(Total of Both Approaches)
Minor Street
880 820
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Calculated By:
Checked By:
Date:
Date:
2 www.JLBTraffic.com
[email protected]
516 W Shaw Ave., Ste 103
Fresno, CA 93704 .
(559) 570-8991 .
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) MINOR
STREET
HIGHERVOLUME
APPROACHVPH
400
300
200
RE LA~ES & 2
1 OR MOIRE LAN1
Es
2 OR JORE JNES & l LANE
1 JNE & 1
1 LANE
100 ----+---+---t-----=-d------=::'"-1<:=-----=:ll 1:::----t---l 7&"--=--=-t=-"':.~~l====jl:::::
200 300 400 500 600 700 800 900 1000
MAJOR STREET - TOTAL OF BOTH APPROACHES -
VEHICLES PER HOUR (VPH)
*Note: 80 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 60 vph applies as the lower threshold volume for a minor street approach with one lane. .. ■ •
r,; r r
r
JLB!!Af.US. - - - - ----
•
1832
516 W. Shaw Ave., Ste. 103
www.JLBtraffic.com Fresno, CA 93704
[email protected] (559) 570-8991
Warrant 3: Peak Hour (Rural)
Cumulative 5-Year plus Buildout Traffic Conditions
12. Road 148 / Caldwell Avenue
AM (PM) Peak Hour
AM Peak Hour – Signal Warrant is Met
PM Peak Hour – Signal Warrant is Not Met
Source: California Manual of Uniform Traffic Control Devices (CA MUTCD 2014 Edition) Chapter 4C: Traffic Control Signal Needs Studies
Part 4: Highway Traffic Signals
November 7, 2014
Road 148
Highest
Approach
Volume =
160 (116) VPH
Caldwell Avenue Total of Both Approaches =
781 (799) VPH
(COMMUNITY LESS THAN 10,000 POPULATION OR ABOVE 40 MPH ON MAJOR STREET) 400
300
200
100
1 JE LAN!S & 21 JE LAJ
2 0 MOREi LANESI & 1 LA~E
----+---+--+---t-----:w=--=:±-------t====-----=E=-----11----- 100* ~ ---+-- ---l-----===1---- 75•
300 400 500 600 700 800 900 1000 1100 1200 1300
*Note: 100 vph applies as the lower threshold volume for a minor-street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one lane.
JlB !!&.f.E!s. - - - -
1833
4630 W. Jennifer, Suite 105, Fresno, CA 93722 • Phone (559) 271-1200 www.vrpatechnologies.com
TRANSPORTATION TECHNOLOGY AND SUSTAINABLE SOLUTIONS
TRANSPORTATION PLANNING • TRAFFIC ENGINEERING • ENVIRONMENTAL ASSESSMENT • SUSTAINABLE COMMUNITIES PLANNING • PUBLIC OUTREACH
MEMORANDUM
TO: Jaymie Brauer, QK
FROM: Erik Ruehr, VRPA Technologies
DATE: March 17, 2026
RE: Clements Ranch Vehicle Miles Traveled (VMT) Analysis This memorandum provides a vehicle miles traveled (VMT) analysis for the proposed Clements Ranch project in the City of Visalia. The project is located east of Lovers Lanes between K Avenue and Caldwell Avenue. The project location and a preliminary site plan are shown in the attachments. The project proposes to build 292 single-family residential units and 375 multi-family residential units.
The VMT analysis was conducted using the City of Visalia VMT Thresholds and Implementation Guidelines dated February 3, 2025 and the online tool that was created for use with the guidelines.
The results of the VMT analysis can be summarized as follows:
A check was conducted to determine whether the project would be screened out of requiring a VMT analysis due to being located in a VMT-efficient area of the Tulare County. However, based on the City’s online screening tool, the project is located in traffic analysis zone (TAZ) 1421, an area of the City where there is currently no population and a determination of VMT per capita is not possible. Therefore, the determination of VMT per capita was based on the VMT per capita of all of the TAZ’s adjacent to the project site.
In addition, it was noted that TAZ’s 1402, 1439, 1440, and 1478, which are adjacent to TAZ 1421, also have no population and there is no data available to determine VMT per capita. Therefore, the VMT per capita for each of these TAZ’s was calculated based on the average of the adjacent TAZ’s for which a VMT per capita value is available. The calculations are included in the attachments and the results are shown below:
TAZ 1402 VMT Per Capita: 9.51
TAZ 1439 VMT Per Capita: 9.98
TAZ 1440 VMT Per Capita: 10.92
TAZ 1478 VMT Per Capita: 18.11
v'RPA TECHNOIOGIES. INC.
1834
Jaymie Brauer
March 17, 2026
Exhibit 1 shows the calculation of VMT per capita for TAZ 1421, where the project site is located.
Based on the average of all traffic analysis zones adjacent to the project site (including the TAZ’s described above), the existing VMT per capita is 11.03. Shown below is a calculation that compares the VMT per capita value for TAZ 1421 to the average VMT per capita for Tulare County to determine whether there is a significant VMT impact:
TAZ 1421 VMT Per Capita: 11.03
Tulare County Average VMT Per Capita: 13.2
16% Below Tulare County Average VMT Per Capita: 11.1 (significance threshold) It can be concluded that the project has a VMT per capita of 11.03 which is below the significance threshold of 11.1. The project has a less than significant VMT impact and no mitigation measures are needed.
Please contact me if you have any questions. I can be reached by email at [email protected] or by phone at (858) 361-7151.
1835
10.39 9.51
9.30 8.62
11.37 9.98
10.92 18.11
11.03 (1) Source: City of Visalia Online VMT Analysis Tool (Accessed 3/17/26) (2) VMT per capita based on average VMT of adjacent TAZ's since the subject TAZ has no existing data. (See text.)
1401
1402 (2)
Exhibit 1
Clements Ranch
VMT Analysis
TRAFFIC ANALYSIS ZONE VMT/CAPITA (1)
Average
1403
1420
1477
1439 (2)
1440 (2)
1478 (2)
1836
Jaymie Brauer
March 17, 2026
ATTACHMENTS
Project Location
Project Site Plan
TAZ 1402 VMT Calculations
TAZ 1439 VMT Calculations
TAZ 1440 VMT Calculations
TAZ 1478 VMT Calculations
1837
MEMO
PAGE 2 OF 14
601 Pollasky Avenue, Suite 301 Clovis, California 93612 Tel (559) 449-2400 Fax (559) 733-7821 www.qkinc.com
♦
Figure 1
Project Site
♦ ♦
1838
For Analysis Purposes Only:
Maximum or 375 High Density
Multi-Family Units
SEESHEET3
------ ---
I
I
i
I
OVERALL BOUNDARY
G -----------~- ==~- ---------
~/ll l"A1.00!0f"SOU,,O,,C,,~
UJISON"°""""'/lEC.GRCfD fl llCCUVfMT
..-.,, ,,w.;~2•21 ...,.,,0
TENTATIVE SUBDIVISION MAP BEING TH E WEST HNI OF IBE SO lJTH\liEST GlUA'UER OF SECTIO~ J , T. 19S., R.25E .• t.mum D!ABLO B>.SEAND l,ffRIDIAN.
IN rnECOUNTYOFTUI.ARE, STATEOFCALIFORN'-..
RECORO OWNER
D>.-ror<;-.~"'11lbl11
(W) l16- ffl0
LAND SURVEYOR
--•= LIH',l'l..s;Cf-
/"59)#9-<• 00
-
CIIYOf"~~'6<SIDU!Dl-''>!$'00/
<Qlll'PJYCA/1!3JRWC-"iGPMffl't
"°'"· lll'TOOISIIIUr,
--i--;io>.«111
""""-""="
~=
ll(M Pl'IOPU1>'flff'C-mlNIY,OFll£(>:)(.O<TrOf"ll,l,\Rf",S'JUl':OF '5rru.o;,,;
,,1u POOm<orll<[ rA.Sr 1WFor11£"""""""'"™""" or """""'.1," :.wr>(-~fA.Sf,"°'-"'f ~DIO<Sf-llfR(IWl,~rol><tO'TIQl<'Vof "6ITJF.~'5rou.- l".<CO'r)NG~Tl,tT-l!WG-OFl>£WlrrI/LJl/£0F..,_(.llffk', AS """'CIIID(=m,a,_r,
""'12J-<J20-ll20.12l-O.,o-.J21NllJ12J-Q2f)-(J22
-~,WO,,,/l-W',-ffi#<IY.CA !>J292 :-;-.,,.?;"""' U:R-1 (IU'-'l<U"':"'IY) 10-"'-"£--"' ounor SCHEDULE
ror<roroo:>1rrorornrcmor1<W"ro11°""'SP,a:
~N,PWIX:WDSCAor:~
,,,,.,,,.,,.,.,wro r11£c,rror"""""
l>lf:IIRE-ll'<J"" HOl£/Jl,/aS7!:-~"'50IUlr" ISIIIIDail ro F,aumc IUll(ll -«:US--"°'-""!>001SID£0Ff"l: l«IOll{',Uc:,,,,[>lf(Wlll.J}j[IJYl:Qf" "'1f.WP ... "1fY',..,- l ™lr'1IOll 1HIS<SM. A""""'-IW'IS"""' :mlOl/"100fffR1'tS'1/fA'5"1 l~Pl.OIU:""""1 "'1H II£ ,,_,,___,,.,,,,ro,,.,.,,..,..,,,,m,c:;,pIDJa.r11£1M:or--, 0,-11£N<St ~/!£RWN'5-SE"J,a,lll[flM£0,-flffi.""0£KlCfflEll"fOF IJI£ R"""""11,5NIJ WZ>l(J(f«lJ1011E""-'lfXJ/UJ.
TEMPORARY ACCESS FOR QARBAOE EASEt.lENT NOTE
I/ICMQil>OJ"">iU<£0ll'5 7!:-A<X.USfQ!<l<l!6'Cf-lSll<ill«l) ro F..curM< >U<fCU ACCESS 70 CU:UCf Gl.o!Q<Gl: s,.,;, ~ otJt.Ul ill:~ ,Mi M1Lro~~ " °""""'ro-2eM
VICINN~. MAP ~
-•=w•~-1 ~
i
f-------.i-'"'~-i
SHEET 10F3
1839
8.51 8.86
9.72 10.39
9.30 8.62
11.37 9.54
(1) Source: City of Visalia Online VMT Analysis Tool (Accessed 3/17/26) (2) VMT per capita based on average VMT of adjacent TAZ's since TAZ 1402 has no existing data. (See text.)
1376
1377
Clements Ranch
VMT Analysis
TAZ 1402
TRAFFIC ANALYSIS ZONE VMT/CAPITA (1)
Average
1378
1401
1403
1420
1477
1840
9.00 8.62
9.51 12.77
9.98 (1) Source: City of Visalia Online VMT Analysis Tool (Accessed 3/17/26) (2) VMT per capita based on average VMT of adjacent TAZ's since TAZ 1439 has no existing data. (See text.)
1419
1420
Clements Ranch
VMT Analysis
TAZ 1439
TRAFFIC ANALYSIS ZONE VMT/CAPITA (1)
Average
1438
1701
1841
8.62 11.37
12.77 10.92
(1) Source: City of Visalia Online VMT Analysis Tool (Accessed 3/17/26) (2) VMT per capita based on average VMT of adjacent TAZ's since TAZ 1440 has no existing data. (See text.)
1420
1477
Clements Ranch
VMT Analysis
TAZ 1440
TRAFFIC ANALYSIS ZONE VMT/CAPITA (1)
Average
1701
1842
11.37 33.71
14.57 12.77
18.11 (1) Source: City of Visalia Online VMT Analysis Tool (Accessed 3/17/26) (2) VMT per capita based on average VMT of adjacent TAZ's since TAZ 1478 has no existing data. (See text.)
Average
1847
1701
1477
1833
Clements Ranch
VMT Analysis
TAZ 1478
TRAFFIC ANALYSIS ZONE VMT/CAPITA (1)
1843
APPENDIX E
WATER SUPPLY ASSESSMENT
1844
CLEMENTS
RANCH WATER
SUPPLY
ASSESSMENT
April 2026
California Water
Service Company,
Visalia District
Woodard
&Curran
1845
California Water Service Company 1 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
TABLE OF CONTENTS
SECTION PAGE NO.
1. INTRODUCTION ................................................................................................................... 4
2. GENERAL REQUIREMENTS FOR THE PREPARATION OF A WATER SUPPLY ASSESSMENT ........................................................................................................................ 8
2.1 Applicability of Senate Bill 610 and 221 to the Proposed Project .................................. 8
2.2 Responsibility for Preparation of the Water Supply Assessment ................................... 9
2.3 Components of a Water Supply Assessment ......................................................................... 9
2.4 Potential Implementation of Development Offset Program .......................................... 10
3. PROJECT DESCRIPTION ..................................................................................................... 12
3.1.1 Single-Family Residential Developments .................................................................... 13
3.1.2 Multi-Family Residential Developments...................................................................... 13
4. PROJECT WATER DEMAND ............................................................................................... 14
4.1 Residential Water Use ................................................................................................................... 14
4.2 Outdoor Water Use ........................................................................................................................ 14
4.3 Water Losses ..................................................................................................................................... 15
4.4 Existing Current Water Demands on the Proposed Project Site ................................... 15
4.5 Total Project Water Demand ...................................................................................................... 15
5. CAL WATER VISALIA DISTRICT WATER DEMAND .......................................................... 17
5.1 Current and Historical Water Demand within the Cal Water Visalia District Service Area ...................................................................................................................................................... 17
5.2 Visalia District Water Demand Projections ............................................................................ 20
5.3 Total Projected Visalia District Water Demand (Including the Proposed Project Demand) ............................................................................................................................................. 20
6. CAL WATER VISALIA DISTRICT WATER SUPPLY ............................................................. 24
6.1 Identification of Water Supply Rights ..................................................................................... 24
6.2 Groundwater Supply ...................................................................................................................... 25
6.2.1 Subbasin Description and Status ................................................................................... 28
6.2.2 Groundwater Management .............................................................................................. 28
6.2.3 Groundwater Use and Supply ......................................................................................... 34
6.2.4 Analysis of Sufficiency of Groundwater Supply ........................................................ 35
6.3 Historical and Current Water Supplies .................................................................................... 36
6.4 Projected Water Supplies ............................................................................................................. 39
6.5 Water Conservation & Demand Management .................................................................... 41
6.6 Water Supply Availability in Normal, Single Dry, and Multiple Dry Years ................. 41
6.6.1 Normal Year ........................................................................................................................... 41
6.6.2 Single Dry Year ...................................................................................................................... 43 1846
California Water Service Company 2 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
6.6.3 Multiple Dry Years ............................................................................................................... 44
7. WATER SUPPLY SUFFICIENCY ........................................................................................... 46
7.1 Comparison of Supply & Demand ........................................................................................... 46
7.2 Finding of Water Supply Sufficiency ........................................................................................ 47
8. CONCLUSIONS .................................................................................................................... 48
9. REFERENCES ........................................................................................................................ 49 APPENDIX A: CLEMENTS RANCH OPERATIONAL STATEMENT ............................................. 50 APPENDIX B: CLEMENTS RANCH SITE PLAN ........................................................................... 51 APPENDIX C: VISALIA DISTRICT AWWA WATER AUDITS ...................................................... 52 APPENDIX D: ESTIMATED HISTORICAL WATER USE AT PROPOSED PROJECT SITE ............ 53 APPENDIX E: CLEMENTS RANCH TENTATIVE SUBDIVISION MAP ....................................... 54 TABLES
Table 3-1: Project Land Use Assumptions
Table 4-1: Summary of Estimated Annual Proposed Project Water Demand Table 5-1: Historical Water Demand for the Visalia District (AFY) Table 5-2: Projected Future Water Demand for the Visalia District (AFY) Table 6-1: Historical Water Supply for the Visalia District (2004-2024) Table 6-2: Historical and Projected Groundwater Production 2004-2045 (AFY) Table 6-3: Projected Normal year water supply and demand (AFY) Table 6-4: Projected Single Dry Year Water Supply and Demand (AFY) Table 6-5: Projected Multiple Dry Year Water Supply and Demand (AFY)
FIGURES
Figure 1-1. Visalia District Service Area and Proposed Project Location Figure 1-2. Proposed Project Location
Figure 5-1. Historical Water Demand for the Visalia District Figure 5-2. Water Demand by Use type for the Visalia District (2020) Figure 5-3. Projected Future Demand for the Visalia District (Inclusive of Proposed Project) Figure 6-1. Regional Setting and Groundwater Basin (Cal Water Visalia District 2020 UWMP) Figure 6-2. Historical 20-Year Water Supply (2004-2024), Visalia District Figure 6-3. Historical (2004-2024) and Projected (2025-2045) Groundwater Production Figure 6-4. Historical (2004-2024) and Projected (2025-2045) Normal Year Water Supply and Demand
1847
California Water Service Company 3 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
Figure 6-5. Historical (2004-2024) and Projected (2025-2045) Single Dry Year Water Supply and Demand
Figure 6-6. Projected Multiple Dry Year Water Supply and Demand 1848
calwater.com
April 3, 2026
Aman Kaur Narwal
419 W. Murray Avenue
Visalia, CA 93291
Dear Mr. Narwal:
This letter serves as the California Water Service Company's (Cal Water) formal approval of the Water Supply Assessment (WSA) for the Clements Ranch Development. This approval is contingent on the developer's compliance with any conditions set forth in the WSA by Cal Water.
Authority for this approval is pursuant to Cal Water's “Resolution to Approve Water Supply Assessment and Related Documents for New Developments” dated October 27, 2021.
Should you have any questions, please contact Michael Bolzowski at [email protected] or (408) 367-8338.
Sincerely,
Ken Jenkins
Vice President, Water Resources Planning & Sustainability
CALIFORNIA WATER SERVICE
I Water Resource Sustainability Department 1720 North First Street San Jose, CA 95112
Quality. Service. Value~
1849
CALIFORNIA WATER SERVICE COMPANY
Resolution to Approve Water Supply Assessment
and Related Documents for New Developments
RESOLVED, that this Board of Directors delegates its authority to approve future water supply assessments and related documents, as required under California Water Code Sections 10910 - 10912, and other related Sections, to any Officer of California Water Service Company.
I, MICHELLE MORTENSEN, Secretary of California Water Service Company, a California corporation, do hereby certify that the foregoing is a full, true and correct copy of certain resolutions adopted by the Board of Directors of said Corporation at a regular meeting of said Board duly called and held October 27, 2021, at which a quorum was present, that all Directors present voted in favor of said resolution, and that said resolution have never been annulled or revoked but are still in force and effect.
IN WITNESS WHEREOF, I have hereunto signed by name this 27th day of October 2021.
CllL~euSJw~
Michelle Mortensen
Corporate Secretary
1850
California Water Service Company 4 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
1. INTRODUCTION
California Water Code:
10910 (a) Any city or county that determines that a project, as defined in Section 10912, is subject to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) under Section 21080 of the Public Resources Code shall comply with this part. 10914 (a) Nothing in this part is intended to create a right or entitlement to water service or any specific level of water service. (b) Nothing in this part is intended to either impose, expand, or limit any duty concerning the obligation of a public water system to provide certain service to its existing customers or to any future potential customers. (c) Nothing in this part is intended to modify or otherwise change existing law with respect to projects which are not subject to this part.
(d) This part applies only to a project for which a notice of preparation is submitted on or after January 1, 1996.
This Senate Bill (SB) 610 compliant water supply assessment (WSA) is for the proposed Clements Ranch Development Project (proposed Project or Project) in California Water Service Company’s (Cal Water) Visalia District (District). The Visalia District is in Tulare County and overlaps with the boundaries of the City of Visalia, as shown in Figure 1-1. As displayed in Figure 1-2, the Project site is adjacent to the District’s eastern boundary. The Project consists of a residential development on approximately 81.5 acres that will include 370 multi-family residential dwelling units and 292 single-family residential dwelling units. The Project also includes 3.5 acres of landscaped space and 11.1 acres of Right-of-Way/Streets. The Project is described in more detail in Section 3.
The information provided in this WSA is consistent with California Water Code (CWC or Water Code) §10910-10912 requirements and the California Department of Water Resources’ (DWR’s) Guidebook for Implementation of Senate Bill 610 and Senate Bill 221 of 2001: To Assist Water Suppliers, Cities, and Counties in Integrating Water and Land Use Planning, dated 8 October 2003 (California Water Code § 10910; California Water Code § 10912; California Department of Water Resources, 2003). The text of specific sub-sections of the Water Code, California Government Code (CGC), the California Business and Professions Code (CBPC), and the California Code of Regulations (CCR) is included in indented and italicized font at the beginning of specific sections of this WSA. The information presented in those respective sections, and the associated tables and figures, respond directly to Water Code requirements.
The purpose of this WSA is to evaluate whether the Visalia District has sufficient water supply to meet the current and planned water demands within the Visalia District, including the demands associated with the proposed Project, during normal and dry hydrologic years over a 20-year time horizon. More specifically, this WSA includes:
• A summary of the WSA requirements articulated in Water Code §10910-10912 and a description of how those requirements apply to the Project; • An analysis describing the current and projected future water demands of the Project through the year 2045;
1851
California Water Service Company 5 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
• An analysis describing the historical and current water demands for the Visalia District, and projected future water demands for its service area through the year 2045; • An analysis describing the current and projected future water supplies for the Visalia District’s service area through the year 2045, including the demands associated with the Project;
• A description of the extent to which the District or the project proponent has the right to extract additional groundwater as needed to supply the Project; • A description of actions the District might take in response to water supply shortages, as summarized in the District’s 2020 Water Shortage Contingency Plan (WSCP); and • A summary of whether the Visalia District’s water supplies are sufficient to meet the demands for Visalia District’s service area, including the projected water demands associated with the Project.
The information contained in this WSA is based primarily on Cal Water’s Visalia District 2020 Urban Water Management Plan (UWMP), except where updated with relevant water demand, supply reliability, and other information provided by Cal Water.
This WSA concludes that sufficient water supply is available to the District to meet all future demands associated with current and planned development within its service area, including those of the proposed Project. The proposed Project lies within the jurisdictions of the Mid‑Kaweah Groundwater Sustainability Agency (MKGSA) and the Greater Kaweah GSA (GKGSA). Although water use for the proposed Project is currently consistent with the GKGSA and MKGSA GSPs, the GKGSA, MKGSA, or another governing entity (e.g., the State Water Resources Control Board (SWRCB)) may adopt and/or implement policies or management actions that could include groundwater allocations for urban users, groundwater extraction reporting requirements, or potential fees associated with groundwater extraction in the future. Should such policies or actions limit access to groundwater, Cal Water may need to undertake additional measures to mitigate any potential impacts on water supply reliability.
1852
California Water Service Company
Clements Ranch Water Supply Assessment Woodard & Curran, Inc. April 3, 2026 6 FIGURE 1-1. VISALIA DISTRICT SERVICE AREA AND PROPOSED PROJECT LOCATION Visalia District
Cal Water
Clements Ranch WSA
N
A
Legend
• -""=='""---"'I' ...
Woodard
• Curran
1853
California Water Service Company
Clements Ranch Water Supply Assessment Woodard & Curran, Inc. April 3, 2026 7 FIGURE 1-2. PROPOSED PROJECT LOCATION
Visalia District
C•I Wat,r
Clements Ranch WSA
N
A
Legend
Vis.Illa District
Woodard
• Curran
Ptqt<tlr:0013051 MlP C1e•cd Dcc:cntic, 202:5
-•~-.--"•-~,_.,.......,. ....
............. -~ ... --..... -.. :::=:::.=::...;:-..-::.=..-::.::
1854
California Water Service Company 8 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
2. GENERAL REQUIREMENTS FOR THE PREPARATION OF A WATER
SUPPLY ASSESSMENT
The section outlines which projects require the preparation of a WSA. It also indicates who is responsible for preparing the WSA and summarizes the necessary components of a WSA.
2.1 Applicability of Senate Bill 610 and 221 to the Proposed Project CWC § 10910 (a) Any city or county that determines that a project, as defined in Section 10912, is subject to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) under Section 21080 of the Public Resources Code shall comply with this part.
CWC § 10912. For the purposes of this part, the following terms have the following meanings:
(a) “Project” means any of the following:
(1) A proposed residential development of more than 500 dwelling units. (2) A proposed shopping center or business establishment employing more than 1,000 persons or having more than 500,000 square feet of floor space.
(3) A proposed commercial office building employing more than 1,000 persons or having more than 250,000 square feet of floor space.
(4) A proposed hotel or motel, or both, having more than 500 rooms. (5) A proposed industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area. (6) A mixed-use project that includes one or more of the projects specified in this subdivision. (7) A project that would demand an amount of water equivalent to, or greater than, the amount of water required by a 500 dwelling unit project.
(b ) If a public water system has fewer than 5,000 service connections, then “project” means any proposed residential, business, commercial, hotel or motel, or industrial development that would account for an increase of 10 percent or more in the number of the public water system’s existing service connections, or a mixed-use project that would demand an amount of water equivalent to, or greater than, the amount of water required by residential development that would represent an increase of 10 percent or more in the number of the public water system’s existing service connections.
CGC § 66473.7 (a) For the purposes of this section, the following definitions apply: (1) "Subdivision" means a proposed residential development of more than 500 dwelling units, except that for a public water system that has fewer than 5,000 service connections, "subdivision" means any proposed residential development that would account for an increase of 10 percent or more in the number of the public water system's existing service connections. (i) This section shall not apply to any residential project proposed for a site that is within an urbanized area and has been previously developed for urban uses, or where the immediate contiguous properties surrounding the residential project site are, or previously have been, developed for urban uses, or housing projects that are exclusively for very low and low-income households.
CBPC § 11010 (b)(6) A true statement of the provisions, if any, that have been made for public utilities in the proposed Subdivision, including water, electricity, gas, telephone, and sewerage facilities. For subdivided lands that were subject to the imposition of a condition pursuant to subdivision (b) of Section 66473.7 of the Government Code, the true statement of the provisions made for water shall be satisfied by submitting a copy of the written verification of the available water supply obtained pursuant to Section 66473.7 of the Government Code. 1855
California Water Service Company 9 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
With the development of 662 residential buildings, the proposed Project exceeds the threshold for a “project” requiring a WSA pursuant to SB 610 (Water Code §10910(a) and 10912(a)(7)).
2.2 Responsibility for Preparation of the Water Supply Assessment CWC § 10910 (b) The city or county, at the time that it determines whether an environmental impact report, a negative declaration, or a mitigated negative declaration is required for any project subject to the California Environmental Quality Act pursuant to Section 21080.1 of the Public Resources Code, shall identify any water system whose service area includes the project site and any water system adjacent to the project site that is, or may become as a result of supplying water to the project identified pursuant to this subdivision, a public water system, as defined in Section 10912, that may supply water for the project.
If the city or county is not able to identify any public water system that may supply water for the project, the city or county shall prepare the water assessment required by this part after consulting with any entity serving domestic water supplies whose service area includes the project site, the local agency formation commission, and any public water system adjacent to the project site.
CGC § 66473.7 (a)(3) "Public water system" means the water supplier that is, or may become as a result of servicing the subdivision included in a tentative map pursuant to subdivision (b), a public water system, as defined in Section 10912 of the Water Code, that may supply water for a subdivision. (b)(1) The legislative body of a city or county or the advisory agency, to the extent that it is authorized by local ordinance to approve, conditionally approve, or disapprove the tentative map, shall include as a condition in any tentative map that includes a subdivision a requirement that a sufficient water supply shall be available. Proof of the availability of a sufficient water supply shall be requested by the subdivision applicant or local agency, at the discretion of the local agency, and shall be based on written verification from the applicable public water system within 90 days of a request. (2) If the public water system fails to deliver the written verification as required by this section, the local agency or any other interested party may seek a writ of mandamus to compel the public water system to comply. (4) If the written verification is not provided by the public water system, notwithstanding the local agency or other interested party securing a writ of mandamus to compel compliance with this section, then the local agency may make a finding that sufficient water supplies are, or will be, available prior to completion of the subdivision that will satisfy the requirements of this section.
This finding shall be made on the record and supported by substantial evidence. (l) Nothing in this section shall preclude the legislative body of a city or county, or the designated advisory agency, at the request of the applicant, from making the determinations required in this section earlier than required pursuant to subdivision (b).
The proposed Project is located within the Cal Water Visalia District service area and the water for the proposed Project will be supplied by Cal Water. Therefore, in accordance with Water Code §10910(b), Cal Water is the entity responsible for preparation and adoption of a WSA for the proposed Project.
2.3 Components of a Water Supply Assessment
CWC § 10910 (c) (4) If the city or county is required to comply with this part pursuant to subdivision (b), the water supply assessment for the project shall include a discussion with regard to whether the total projected water supplies, determined to be available by the city or county for the project during normal, single dry, and multiple dry water years during a 20-year projection, will meet the projected water demand associated with the proposed project, in addition to existing and planned future uses, including agricultural and manufacturing uses.
CWC § 10911 (b) The city or county shall include the water supply assessment provided pursuant to Section 10910, and any information provided pursuant to subdivision (a), in any environmental document prepared for the project pursuant to Division 13 (commencing with Section 21000) of the Public Resources Code. (c) The city or county may include in any environmental document an evaluation of any information included in that environmental document provided pursuant to subdivision (b). The city or county shall determine, based on the entire record, whether projected water supplies will be sufficient to satisfy the demands of the project, in addition to existing and planned future uses. If the city or county determines that water supplies will not be sufficient, the city or county shall include that determination in its findings for the project.
CGC § 66473.7 (a)(2) "Sufficient water supply" means the total water supplies available during normal, single-dry, and multipledry years within a 20-year projection that will meet the projected demand associated with the proposed subdivision, in addition 1856
California Water Service Company 10 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
to existing and planned future uses, including, but not limited to, agricultural and industrial uses. In determining "sufficient water supply," all of the following factors shall be considered:
(A) The availability of water supplies over a historical record of at least 20 years. (B) The applicability of an urban water shortage contingency analysis prepared pursuant to Section 10632 of the Water Code that includes actions to be undertaken by the public water system in response to water supply shortages. (C) The reduction in water supply allocated to a specific water use sector pursuant to a resolution or ordinance adopted, or a contract entered into, by the public water system, as long as that resolution, ordinance, or contract does not conflict with Section 354 of the Water Code.
(D) The amount of water that the water supplier can reasonably rely on receiving from other water supply projects, such as conjunctive use, reclaimed water, water conservation, and water transfer, including programs identified under federal, state, and local water initiatives such as CALFED and Colorado River tentative agreements, to the extent that these water supplies meet the criteria of subdivision (d).
As listed above in CWC § 10910(c)(4) and CGC §66473.7(a)(2), the primary purpose of a WSA is to evaluate whether sufficient water supply is available to meet all future demands within the water supplier’s service area, including those associated with the proposed Project, during normal and dry hydrologic years for a 20-year planning horizon. More specifically, this WSA includes:
• A summary of the WSA requirements articulated in Water Code §10910-10912 and a description of how those requirements apply to the Project; • An analysis describing the current and projected future water demands of the Project through the year 2045;
• An analysis describing the historical and current water demands for the Visalia District, and projected future water demands for its service area through the year 2045; • An analysis describing the current and projected future water supplies for the Visalia District’s service area through the year 2045, including the demands associated with the Project;
• A description of the extent to which the District or the project proponent has the right to extract additional groundwater as needed to supply the Project; • A description of actions the District might take in response to water supply shortages, as summarized in the District’s 2020 Water Shortage Contingency Plan (WSCP); and • A summary of whether the Visalia District’s water supplies are sufficient to meet the demands for Visalia District’s service area, including the projected water demands associated with the Project.
2.4 Potential Implementation of Development Offset Program As described in greater detail in Section 6.2, the GKGSA, the MKGSA, or another governing entity may implement policies or management actions in the future that may impact the availability of the District’s groundwater supplies, including but not limited to, groundwater allocations, groundwater extraction reporting requirements, and establishment of potential fees associated 1857
California Water Service Company 11 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
with groundwater extraction activities. Given the potential uncertainty surrounding future groundwater management, Cal Water is currently exploring implementation of a Development Offset Program for new developments to ensure that overall customer demand does not exceed the available future supply and to ensure water supply reliability. 1858
California Water Service Company 12 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
3. PROJECT DESCRIPTION
The proposed Project will be developed on an approximately 81.5-acre site located southeast of the City of Visalia, adjacent to the City limits within Urban Growth Boundary II. The Project site includes Assessor’s Parcel Numbers (APNs) 127-020-20 and 127-020-21.
The proposed Project consists of a combined 662 market-rate multi-family (370) and single-family (292) residential dwelling units (DU). The site incorporates a mix of residential land use designations, including High-Density Residential (R-M-3, Multi-Family Residential – 1,200 square feet (SF) lots), Medium-Density Residential (R-M-2, Multi-Family Residential – 3,000 SF lots), and Low-Density Residential (R-1-5, Single-Family Residential – 5,000 SF lots). Access to both the LowDensity and Medium-Density portions of the site will be provided through two primary entry points located on Lovers Lane and Sunny Side Avenue. Table 3-1 summarizes the proposed Project’s land uses.
TABLE 3-1: PROJECT LAND USE ASSUMPTIONS
Use Type Proposed
Use Total SF Commercial SF Acreage # of DUs Notes
Single-Family
Residential
Single-Family
Residential 1,964,556 N/A 45.1 292
139 units 50' x
100' lots & 153
38' x 72' lots
Multi-Family
Residential
Multi-Family
Residential 949,608 N/A 21.8 370
Other Right-ofWay/Streets 483,516 N/A 11.1 N/A
Landscape Landscape 152,460 N/A 3.5 N/A
Total 3,550,140 0 81.5 662
1859
California Water Service Company 13 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
3.1.1 Single-Family Residential Developments
The single-family component of the Project includes 292 market-rate dwelling units located within the Low-Density Residential land use designation. This portion of the site is designed with lots consistent with the minimum 5,000 SF lot size required for low-density development. The singlefamily neighborhood will offer traditional detached homes, providing a lower-density residential environment that complements the higher-density multi-family areas elsewhere on the site.
3.1.2 Multi-Family Residential Developments
The multi-family component of the Project consists of 370 market-rate residential units that are distributed across seven parcels of 30 DU and four parcels of 40 DU, located within areas designated for High-Density and Medium-Density land uses. These portions of the site are planned to accommodate smaller lot sizes consistent with multi-family development standards, including 1,200-square-foot lots in the High-Density area and approximately 2,736 SF lots in the Medium-Density area. The Medium-Density multi-family area will be developed as a Planned Unit Development (PUD) to allow reduced lot sizes, private internal streets, and a gated community layout.
1860
California Water Service Company 14 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
4. PROJECT WATER DEMAND
City of Visalia and Tulare County have adopted green building standards and water-efficient landscaping ordinances consistent with previous versions of the CALGreen Building Standards Code and the California Model Water Efficient Landscape Ordinance (MWELO) (23 CCR 2.2.7 § 490-495, 2025; CALGreen, 2022) Landscaping will also comply with Assembly Bill (AB) 1572 (AB 1572, 2023). As part of state requirements, all new developments within City of Visalia and Tulare County must meet these efficiency standards. Accordingly, the proposed Project will incorporate low-flow lavatory faucets, kitchen faucets, toilets, and urinals in accordance with CALGreen Code, and include low-water-use landscaping and high-efficiency irrigation systems to minimize outdoor water use in compliance with MWELO.
As described below, the average annual water demand for the proposed Project was estimated using the Cal Water WSA Water Factor Tool (Cal Water, 2019) and information provided by the Project Proponent in coordination with Cal Water. Outdoor water use was estimated using landscaping plans provided by the Project Proponent and methods described under MWELO.
Total water demands include water used by the proposed Project for residential and outdoor uses, in addition to distribution system losses and other unaccounted for water. Table 4-1 provides a summary of annual Project water demands by water use type, and forecasts Project water demands through 2050.
4.1 Residential Water Use
The Project includes 292 DU in single-family residential buildings and 370 DU in multi-family DU.
Based on the Cal Water WSA Water Factor Tool, each single-family DU is expected to use 409 gallons per day (GPD), and each multi-family DU is expected to use 148 GPD. Residential water demand is thus 174,188 GPD, which is equivalent to 195 AFY.
4.2 Outdoor Water Use
In accordance with MWELO, a Project’s water budget, or Maximum Applied Water Allowance (MAWA), is calculated using the formula below, where ETo refers to local reference evapotranspiration, ETAF refers to the evapotranspiration adjustment factor, and LA and SLA refer to landscape area and Special Landscape Area, respectively (California Department of Water Resources, 2015). ETo for Visalia is 53.3 inches per year. Because the proposed Project is primarily residential, the MWELO residential ETAF standard of 0.55 will be applied. The conversion factor from inches to gallons is 0.62. The proposed Project does not have any SLAs, and the total landscape area is 152,460 SF. As shown in the calculations below, the MAWA, or total landscaping water budget, for the Project, is 2,784,414 gallons per year. = × 0.62 × [ × + 1 − × ]
= 2,784,414
/"#
$
1861
California Water Service Company 15 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
The Project will be required to meet MWELO, and final landscape plans must achieve ETWU ≤ MAWA. For purposes of this WSA, the water demand associated with the Project’s landscaping is assumed to be equal to MAWA.
4.3 Water Losses
Water losses (including both real and apparent losses) associated with the Project are expected to be minimal. However, estimates are included in this analysis to maintain conservative estimates of Project water demands. Between 2021-2023, the District’s water loss averaged approximately 806 AFY, across an average of 48,540 active and inactive service connections. (California Water Service, 2022; 2023; 2024). Project water loss was assumed to be proportional to the District’s water losses, so the same proportion was applied to the Project’s water demands. As shown in Table 4-1, water losses associated with the Project are estimated to be 6 AFY. Water Loss Audits are included in Appendix C.
4.4 Existing Current Water Demands on the Proposed Project Site The Proposed Project site has historically been used for irrigated agricultural production, relying exclusively on groundwater pumped from the underlying Subbasin. LandIQ land‑use data (2024), the most reliable and widely used dataset for agricultural land‑use classification in the region, indicates that between 2020 and 2024 the site supported a rotation of wheat on approximately 43 acres and almonds on approximately 25 acres. In addition, roughly 5 acres in the northwest corner of the site have been fallowed or idle for more than four consecutive years.
Because parcel‑specific groundwater pumping data are not available, historical groundwater use at the site was estimated using the MAWA methodology. This method applies crop‑ and climate‑based irrigation requirements to the mapped planted acreage, consistent with the approach used by the GSAs and in other recent WSAs in the Visalia area. Based on these MAWA‑derived estimates, historical irrigation demand for the site ranged from approximately 210 to 348 AFY between 2020 and 2024, with an average irrigation demand of about 264 AFY over the five‑year period.
These historical agricultural demands were met directly through on‑site groundwater pumping and were not supplied by Cal Water. Because agricultural pumping is independent of and not connected to the Cal Water Visalia District system, the Project’s potable water demand estimates do not subtract the historical agricultural groundwater use. This approach is consistent with Cal Water practice and with other WSAs (e.g., Carleton Acres and Pratt Family Ranch), even though both historical and future pumping originate from the same Subbasin. Once the agricultural use ceases, Cal Water becomes the exclusive supplier to the site, and the Project’s full potable water demand is therefore additive to the District’s overall demand projections.
4.5 Total Project Water Demand
At full buildout, assumed to be 2030, the proposed Project is estimated to have a total water demand of approximately 209 AFY from the water uses described below in Table 4-1. 1862
California Water Service Company 16 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
TABLE 4-1: SUMMARY OF ESTIMATED ANNUAL PROPOSED PROJECT WATER DEMAND Water Use
Project Characteristics Demand
Factor Units GPD1
Total Water Demand (AFY)
Area (SF) Area (acres) # of DUs 2030 2035 2040 2045 2050 Proposed Project
Single-Family
Residential 1,964,556 45 292 409 GPD/ unit 119,428 134 134 134 134 134 Multi-Family
Residential 949,608 22 370 148 GPD/ unit 54,760 61 61 61 61 61 Landscape 152,460 4 N/A 2,784,414 gallons per year N/A 9 9 9 9 9
Water Loss 6 6 6 6 6
Existing Site Demand
2 0 0 0 0 0
Net Annual Water Demand 209 209 209 209 209
1GPD values are rounded 2The average historical agricultural demand associated with the Project site was calculated to be 264 AFY (see Appendix D); as historical water demands were not supplied by Cal Water, the total Project demands do not consider existing site demands. 1863
California Water Service Company 17 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
5. CAL WATER VISALIA DISTRICT WATER DEMAND
CWC 10910 § (c)(1) The city or county, at the time it makes the determination required under Section 21080.1 of the Public Resources Code, shall request each public water system identified pursuant to subdivision (b) to determine whether the projected water demand associated with a proposed project was included as part of the most recently adopted urban water management plan adopted pursuant to Part 2.6 (commencing with Section 10610). (3) If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water system's total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water system's existing and planned future uses, including agricultural and manufacturing uses.
The water demands of the Project were not accounted for in the District’s most recent UWMP.
The following sections assess the historical and projected water demands within the District service area, including the Project.
5.1 Current and Historical Water Demand within the Cal Water Visalia District Service Area
Historical water demands in the Visalia District have changed significantly in the last two decades.
As shown in Table 5-1, demand peaked in 2008 at 34,848 AF, driven largely by increases in singlefamily residential use (Cal Water, 2025). After 2008, overall demand began to decline, reaching its lowest point in 2015 at 24,675 AF, likely due to drought-related restrictions and efficiency measures. Following this dip, demand gradually rebounded, stabilizing around 29,000–30,000 AF between 2018 and 2024. Single-family residential use remained the dominant category throughout the period, accounting for the largest share of demand. Table 5-1 describes demands since 2004.
As displayed in Figure 5-2, 64% of demand in 2020 was attributed to single-family residential use, with losses (3%), commercial use (17%), institutional or governmental use (9%), multi-family residential use (5%), and industrial use (1%) accounting for the remaining 2020 demands (Cal Water, 2021).
1864
California Water Service Company 18 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
TABLE 5-1: HISTORICAL WATER DEMAND FOR THE VISALIA DISTRICT (AFY) Single-Family
Residential
Multi-Family
Residential Commercial Institutional/ Government Industrial Other Losses Total Water Demand 2004 20,867 989 5,888 1,606 318 219 2,599 32,486 2005 19,556 926 5,431 1,636 288 408 2,456 30,701 2006 20,463 929 5,685 1,636 305 451 2,563 32,032 2007 22,027 914 6,376 1,889 312 337 2,770 34,625 2008 21,989 1,065 6,033 2,512 322 140 2,788 34,848 2009 21,362 1,197 5,942 2,515 270 54 2,725 34,065 2010 19,407 1,205 5,898 2,404 269 39 2,541 31,762 2011 18,109 1,576 5,382 2,434 286 53 2,421 30,260 2012 20,337 1,827 5,546 2,817 324 68 482 31,400 2013 20,995 1,846 5,595 2,900 393 97 535 32,360 2014 18,832 1,685 5,296 2,485 407 77 692 29,475 2015 15,338 1,479 4,526 2,001 366 96 870 24,675 2016 15,756 1,429 4,493 2,201 352 214 1,231 25,677 2017 16,954 1,477 5,012 2,505 407 215 1,129 27,698 2018 18,037 1,499 5,421 2,728 405 148 835 29,073 2019 18,112 1,497 5,342 2,873 414 118 298 28,654 2020 19,361 1,525 5,240 2,601 306 200 941 30,172 2021 19,496 1,483 5,541 2,410 344 125 767 30,166 2022 18,800 1,460 5,509 2,299 342 245 755 29,410 2023 17,803 1,396 5,405 2,255 380 139 608 27,985 2024 18,774 1,449 5,623 2,469 401 102 733 29,550 1865
California Water Service Company 19 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
FIGURE 5-1. HISTORICAL WATER DEMAND FOR THE VISALIA DISTRICT FIGURE 5-2. WATER DEMAND BY USE TYPE FOR THE VISALIA DISTRICT (2020) 40,000
35,000
:;:-
30,000
""CJ
C 25,000 ro E
V
0 20,000
15,000 ro 3
ro 10,000 0
I5,000
0 17%
lO r-- <X>
0 0 0 0 0 0
N N N
O') 0 ,- N
8 0 0 0
N N N N
Total Water Demand
0 N
0 N
N
0 N
N
N
0 N
Single-Family Residential
Multi-Family Residential
Commercial
Institutional/Government
• Industrial
Other
Losses
M
N
0 N
1866
California Water Service Company 20 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
5.2 Visalia District Water Demand Projections
The District’s 2020 UWMP estimated future water demands through 2045 using historical water use data and projections of population change and climate variability (Cal Water, 2021). Table 5-2 presents the UWMP projections at a 5-year interval. District water demand is expected to increase approximately 26% between 2030 and 2045. The water demand projections are higher than the average demand observed between 2016 and 2020 and between 2021 and 2024.
Along with this proposed Project, Cal Water has also received several other development proposals and has completed Water Supply Assessment (WSA) and demand projections for each.
These include:
• Carleton Acres
o Single‑Family Homes: 1,592 DUs
o Multi‑Family Homes: 1,670 DUs
o Total Commercial Area: 277,264 SF
o Total Landscape Irrigation Area: 1,016,280 SF
• Pratt Family Ranch
o Single‑Family Homes: 541 DUs
o Total Landscape Irrigation Area: 414,560 SF
• Kelsey–Hurley Industrial Park
o Total Land Use Area: 2,276,644 SF
In addition to the proposed Project, Cal Water has identified additional development projects within the District:
• CapRock Partners warehouses – About 1.27 million SF (75 acres) along Highway 99 in West Visalia near Plaza Drive.
• Seefried Industries – A 284-acre industrial park at the northwest corner of Shirk Street and Riggin Avenue
The status and water demand of the CapRock Partners and Seefried Industries projects above are unknown at this time and are therefore not included for in this WSA.
5.3 Total Projected Visalia District Water Demand (Including the Proposed Project Demand)
The total water demand for the proposed Project was not accounted for in the District 2020 UWMP projections (Cal Water, 2021). Consequently, the demands associated with the proposed Project are assumed to be additive to District’s overall demands. 1867
California Water Service Company 21 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
As discussed in Section 4 above, the proposed Project is estimated to have an annual water demand of 209 AFY. Thus, the District’s total water demand, including Project demand, is expected to reach 46,361 AFY in 2045, as shown in Table 5-2. Figure 5-3 displays the District’s total projected water demands through 2045.
1868
California Water Service Company 22 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
TABLE 5-2: PROJECTED FUTURE WATER DEMAND FOR THE VISALIA DISTRICT (AFY) Projected Water Demand 2030 2035 2040 2045
Visalia District* 35,275 38,309 41,258 44,529
Clements Ranch
Development 209 209 209 209
Carleton Acres 306 484 941 1,108
Pratt Family Ranch 275 275 275 275
Kelsey-Hurley Industrial Park 240 240 240 240
Total 36,305 39,517 42,923 46,361
* As reported in 2020 UWMP (Cal Water, 2021). Includes non-revenue water. 1869
California Water Service Company 23 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
FIGURE 5-3. PROJECTED FUTURE DEMAND FOR THE VISALIA DISTRICT (INCLUSIVE OF PROPOSED PROJECT) 50,000
45,000 40,000
LL 35,000
"'O
C 30,000 co E
QJ
0 25,000
..._
QJ
.....
co 20,000 co 15,000 .....
0 I10,000
5,000
2030 2035 2040 2045
District Clements Ranch Development Carleton Acres
Pratt Family Ranch Kelsey-Hurley Industrial Park
1870
California Water Service Company 24 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
6. CAL WATER VISALIA DISTRICT WATER SUPPLY
CGC § 66473.7 (c) The applicable public water system's written verification of its ability or inability to provide a sufficient water supply that will meet the projected demand associated with the proposed subdivision as required by subdivision (b) shall be supported by substantial evidence. The substantial evidence may include, but is not limited to, any of the following: (1) The public water system's most recently adopted urban water management plan adopted pursuant to Part 2.6 (commencing with Section 10610) of Division 6 of the Water Code. (2) A water supply assessment that was completed pursuant to Part 2.10 (commencing with Section 10910) of Division 6 of the Water Code. (3) A groundwater sustainability plan adopted or alternative approved pursuant to Part 2.74 (commencing with Section 10720) of Division 6 of the Water Code. (4) Other information relating to the sufficiency of the water supply that contains analytical information that is substantially similar to the assessment required by Section 10635 of the Water Code.
This section identifies the water supplies for the District and discusses the vulnerability of the various supplies to drought and other factors affecting water supply reliability. Unless otherwise noted, the source of the information included in this section is the District’s 2020 UWMP. The District’s water supply is sourced exclusively from groundwater extracted from the Kaweah and Tule Subbasins, both of which are part of the San Joaquin Valley Groundwater Basin.
6.1 Identification of Water Supply Rights
CWC §10910 (d) (1) The assessment required by this section shall include an identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts.
CGC § 66473.7 (d) When the written verification pursuant to subdivision (b) relies on projected water supplies that are not currently available to the public water system, to provide a sufficient water supply to the subdivision, the written verification as to those projected water supplies shall be based on all of the following elements, to the extent each is applicable:
(1) Written contracts or other proof of valid rights to the identified water supply that identify the terms and conditions under which the water will be available to serve the proposed subdivision. (2) Copies of a capital outlay program for financing the delivery of a sufficient water supply that has been adopted by the applicable governing body.
(3) Securing of applicable federal, state, and local permits for construction of necessary infrastructure associated with supplying a sufficient water supply.
(4) Any necessary regulatory approvals that are required in order to be able to convey or deliver a sufficient water supply to the subdivision.
(g) The written verification prepared under this section shall also include a description, to the extent that data is reasonably available based on published records maintained by federal and state agencies, and public records of local agencies, of the reasonably foreseeable impacts of the proposed subdivision on the availability of water resources for agricultural and industrial uses within the public water system's service area that are not currently receiving water from the public water system but are utilizing the same sources of water. To the extent that those reasonably foreseeable impacts have previously been evaluated in a document prepared pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) or the National Environmental Policy Act (Public Law 91-190) for the proposed subdivision, the public water system may utilize that information in preparing the written verification.
Pursuant to California law, WSAs are required to identify all water rights or supply entitlements relevant to the proposed Project. The District meets its demand solely through groundwater. This section summarizes the water rights and supplies available to the District. 1871
California Water Service Company 25 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
6.2 Groundwater Supply
CWC § 10910 (f) If a water supply for a proposed project includes groundwater, the following additional information shall be included in the water supply assessment:
(1) A review of any information contained in the urban water management plan relevant to the identified water supply for the proposed project.
(2) (A) A description of any groundwater basin or basins from which the proposed project will be supplied. (B) For those basins for which a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has the legal right to pump under the order or decree.
(C) For a basin that has not been adjudicated that is a basin designated as high- or medium-priority pursuant to Section 10722.4, information regarding the following:
(i) Whether the department has identified the basin as being subject to critical conditions of overdraft pursuant to Section 12924.
(ii) If a groundwater sustainability agency has adopted a groundwater sustainability plan or has an approved alternative, a copy of that alternative or plan.
(D) For a basin that has not been adjudicated that is a basin designated as low- or very low priority pursuant to Section 10722.4, information as to whether the department has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue, in the most current bulletin of the department that characterizes the condition of the groundwater basin, and a detailed description by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), of the efforts being undertaken in the basin or basins to eliminate the long-term overdraft condition.
(3) A detailed description and analysis of the amount and location of groundwater pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), for the past five years from any groundwater basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records. (4) A detailed description and analysis of the amount and location of groundwater that is projected to be pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), from any basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records. (5) An analysis of the sufficiency of the groundwater from the basin or basins from which the proposed project will be supplied to meet the projected water demand associated with the proposed project. A water supply assessment shall not be required to include the information required by this paragraph if the public water system determines, as part of the review required by paragraph (1), that the sufficiency of groundwater necessary to meet the initial and projected water demand associated with the project was addressed in the description and analysis required by paragraph (4) of subdivision (b) of Section 10631.
CGC § 66473.7 (a)(2)(E) If a proposed subdivision relies in whole or in part on groundwater, the following factors: (i) For a basin for which a court or the State Water Resources Control Board has adjudicated the rights to pump groundwater, the order or decree adopted by the court or the State Water Resources Control Board. (ii) For a basin that has not been adjudicated, as follows: (I) For a basin designated as high- or medium-priority pursuant to Section 10722.4 of the Water Code, the most recently adopted or revised adopted groundwater sustainability plan or approved alternative. If there is no adopted groundwater sustainability plan or approved alternative, information as to whether the Department of Water Resources has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue. (II) For a basin designated as low- or very low priority pursuant to Section 10722.4 of the Water Code, information as to whether the Department of Water Resources has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue. (g) The written verification prepared under this section shall also include a description, to the extent that data is reasonably available based on published records maintained by federal and state agencies, and public records of local agencies, of the reasonably foreseeable impacts of the proposed subdivision on the availability of water resources for agricultural and industrial uses within the public water system's service 1872
California Water Service Company 26 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
area that are not currently receiving water from the public water system but are utilizing the same sources of water. To the extent that those reasonably foreseeable impacts have previously been evaluated in a document prepared pursuant to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) or the National Environmental Policy Act (Public Law 91-190) for the proposed subdivision, the public water system may utilize that information in preparing the written verification. (h) Where a water supply for a proposed subdivision includes groundwater, the public water system serving the proposed subdivision shall evaluate, based on substantial evidence, the extent to which it or the landowner has the right to extract the additional groundwater needed to supply the proposed subdivision. Nothing in this subdivision is intended to modify state law with regard to groundwater rights.
The District operates three public water systems (PWS): the Visalia System, the Tulco System, and the Mullen System. The Visalia PWS and Tulco PWS overlie the Kaweah Subbasin, while the Mullen System is located within the Tule Subbasin, as shown in as shown in Figure 6-1. Both subbasins are part of the larger San Joaquin Valley Groundwater Basin, identified by DWR as Basin Nos. 5-022.11 and 5-022.13.
Nearly all of the District’s water supply is pumped from the Kaweah Subbasin; only about 0.1% of annual production comes from wells in the Tule Subbasin. Because the Proposed Project (and most of the District’s customers) are located within the Kaweah Subbasin, this WSA focuses on groundwater conditions and management within that subbasin.
Cal Water operates as a public utility and is required by the California Public Utilities Commission (CPUC) to serve all customers within its approved service area under reasonable rules and tariffs.
The groundwater basin is not adjudicated, and the supply projections presented in this WSA do not limit, define, or otherwise alter Cal Water’s groundwater rights or its ability to pump the volumes needed to meet customer demand.
1873
California Water Service Company 27 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
FIGURE 6-1. REGIONAL SETTING AND GROUNDWATER BASIN (CAL WATER VISALIA DISTRICT 2020 UWMP) Tule East GSA
Huron
an
rth
Nav,1 Air
St.ition
Lemoore
Groundwater Basins ]
Cal Water V,sa lia D,strict
Tu a,e
Lake Bed
GSA Name
V\.
fZZI Greater Kaweah GSA
Mid-Koweoh GSA
Development Area
[=:J Service Area Boundary
Groundwater
Basins
D ~~QUIN VALLEY .
~::diAQUIN VALLEY • D ~~i OAQUIN VALLEY .
- VALLEY -
Th11d ~.,iy GI<; OouLo ,me,: Th,. '""f' i,, lo, ,. f.,.nc;., ..,,J 9<•phit41 P<" I-"" only .nd , ho,,, kl """' bt ,.,!;.d .,.P"" bv thi.d po,,,., lo, •nv l.g.l J...11.on, A")' ,,el,. nc; ~ upon the mtp o, d.,t, <ont .. ••ed her" n )11,II be et the u1cr,' 10~ 11)l Source,: E,i~ l 01nfom, G,,m•n. f.AO, NO,I.,\ VSGS. C ~nSl•ttl"4<tp conbit,,..tOlt. ond the GIS Uie r Comin,..,,ty. &,~ NASA, NGA.. lJS(jS N
A
0 0 0 0
--==---•Feet
1 ir,ch = feet
Woodard
&Curran
PiojectJI: 001305 1
M.'.lp Created: Apnl 2026
1874
California Water Service Company 28 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
6.2.1 Subbasin Description and Status
The Kaweah Subbasin encompasses approximately 446,000 acres, or 696 square miles, in the San Joaquin Valley. It is bordered by the Kings Subbasin to the north, the Tule Subbasin to the south, the crystalline bedrock of the Sierra Nevada foothills to the east, and the Tulare Lake Subbasin to the west. The Subbasin is not adjudicated. Under the Sustainable Groundwater Management Act (SGMA), DWR determined that it is in critical overdraft (California Department of Water Resources, 2019) and designated it as a high-priority basin in its 2019 Phase 2 Basin Prioritization.
Basins are ranked on eight components, with scores above 21 points classified as “high priority”.
The Kaweah Subbasin received the maximum score of 40 points due to its critically overdrafted condition. Key factors contributing to this designation include irrigated acreage per square mile, population growth, and groundwater reliance, each scoring 5 out of 5 points. Additional factors include declining groundwater levels and subsidence, which scored 4 out of 5 points, as well as high well density, which also scored 4 out of 5 points.
6.2.2 Groundwater Management
6.2.2.1 Non-SGMA Groundwater Management Program
Before SGMA was adopted, groundwater in the Kaweah Subbasin was managed under the Kaweah River Basin Integrated Regional Water Management Plan (IRWMP), last updated in July 2018. The IRWMP outlined objectives in five areas: groundwater management, water supply, water quality, flood control, and ecosystem restoration. These objectives guided regional water strategies and project proposals. Today, the Kaweah Subbasin GSPs have replaced the IRWMP as the primary groundwater management framework.
Historically, the Kaweah Delta Water Conservation District (KDWCD) and other irrigation districts managed groundwater through conjunctive use of surface water. KDWCD programs provide additional surface water for irrigation, reducing groundwater pumping and promoting in-lieu recharge. Groundwater serves as a backup when surface water is limited and as the sole source in areas without surface water access. KDWCD also operates water management basins that support flood control and groundwater replenishment, with recharge occurring through direct infiltration and percolation from surface water applications.
In the Lower Kaweah River area, including Packwood and Cameron Creeks, surface water deliveries are managed by Tulare Irrigation District (TID) and other entities. The City of Visalia maintains a groundwater recharge program funded by Cal Water customers through a pumping charge. This program works in coordination with KDWCD and irrigation districts to enhance groundwater sustainability.
6.2.2.2 SGMA Groundwater Management Program
The California State Legislature enacted SGMA in 2014 with amendments in 2015. SGMA requires the creation of GSAs and the preparation of GSPs for medium- and high-priority groundwater 1875
California Water Service Company 29 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
basins (as designated by DWR). As a high-priority basin, the Subbasin must comply with SGMA requirements, including requirements to be managed under one or more GSAs and submitting one or more GSPs to DWR.
To meet these SGMA requirements, three GSAs were formed to assume responsibility for sustainable groundwater management of the Kaweah Subbasin: the MKGSA, EKGSA, and GKGSA.
Each GSA prepared an individual GSP, but certain technical efforts (e.g., development of a coordinated water budget) were cooperatively developed through a Coordination Agreement.
The majority of the Visalia District falls within the jurisdiction of the MKGSA, which covers an area of approximately 104,320 acres in the central to southwestern side of the Kaweah Subbasin. The Proposed Project falls within the GKGSA which covers roughly 217,600 acres.
All GSPs for the Subbasin were originally submitted to DWR ahead of the January 30, 2020 deadline. After DWR identified deficiencies in July 2022, the GSAs revised and resubmitted their plans. DWR later deemed those 2022 versions inadequate, prompting each GSA to release and adopt a second set of revisions in November 2024. These 2024 Second Amended GSPs represent the most current planning efforts for the Subbasin.
As defined under SGMA, sustainable yield means “the maximum quantity of water, calculated over a base period representative of long-term conditions in a basin and including any temporary surplus, that can be withdrawn annually from a groundwater supply without causing undesirable results” (CWC §10721(w)). Within this framework, the sustainable yield of the Subbasin is approximately 578,000 AFY (MKGSA, 2024) (GKGSA, 2024).
Projects and management actions described in the GSPs to support long‑term sustainability include development of new recharge and storage facilities, upgrades to existing recharge basins, and both agricultural and municipal conservation initiatives. The GSP also evaluates potential implementation of groundwater flow meters to support programs such as fee‑based management tools, incentive structures, groundwater markets, and allocation systems. The document notes that a formal allocation program may be pursued if other management approaches do not sufficiently achieve sustainability objectives.
6.2.2.2.1 Current Status of the GSPs
In January 2022, DWR issued a determination that the three original GSPs and the Subbasin’s coordination agreement, submitted in 2020, were “incomplete” under SGMA regulations (23 CCR §355.2(e)(2)). The specific deficiencies identified by DWR are listed below.
A. The Plan does not define sustainable management criteria for chronic lowering of groundwater levels in the manner required by SGMA and the GSP Regulations. a. The GSPs do not define metrics for undesirable results and minimum thresholds based on avoiding a significant and unreasonable depletion of groundwater supply, informed by, and considering, the relevant and applicable beneficial uses and users in their Subbasin.
1876
California Water Service Company 30 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
b. The GSPs do not describe specific potential effects from the chronic lowering of groundwater levels and depletion of supply that would be significant and unreasonable to beneficial uses and users of groundwater, on land uses and property interests, and other potential effects and, therefore, constitute an undesirable result. c. The GSPs do not consider how minimum thresholds developed for one sustainability indicator will affect other related sustainability indicators.
B. The Plan does not define sustainable management criteria, including undesirable results, minimum thresholds, and measurable objectives, for land subsidence in the manner required by SGMA and the GSP Regulations.
a. The Greater Kaweah GSP and Mid-Kaweah GSP do not define metrics for undesirable results and minimum thresholds based on the amount of subsidence that would substantially interfere with land surface uses and users in their Subbasin, as required by SGMA and the GSP Regulations. The Greater Kaweah and Mid-Kaweah GSPs set minimum thresholds that would allow for up to 0.75 feet per year of continued subsidence (up to 15 feet over the next 20 years), but these thresholds are not designed to avoid undesirable results as required by the GSP Regulations. b. Discordant sustainable management criteria for land subsidence in the vicinity of the Friant Kern Canal established by the Greater Kaweah and East Kaweah GSPs are not supported by convincing technical information demonstrating that the Greater Kaweah thresholds will not adversely affect conditions in East Kaweah and prevent that part of the Subbasin from achieving its sustainability goal.
C. The Plan does not sufficiently and consistently characterize interconnected surface water nor define sustainable management criteria for the depletion of those interconnected surface waters in the manner required by SGMA and the GSP Regulations. a. While the Plan identifies locations where interconnected surface water is likely present in the Subbasin, it is not coordinated in its management efforts for the depletion of interconnected surface water.
b. The Greater Kaweah GSP documents areas with likely interconnected surface water, as does the Coordination Agreement, but the Greater Kaweah GSA has not developed sustainable management criteria for interconnected surface water. c. The East Kaweah GSP elected to use groundwater level thresholds as a proxy for the depletion of interconnected surface water, but do not demonstrate adequate evidence showing those levels are an appropriate proxy.
Pursuant to 23 CCR §355.2(e)(2), the GSAs had 180 days from DWR’s determination to remedy the noted deficiencies, with July 27, 2022 serving as the resubmittal deadline. The agencies submitted amended GSPs on that date; however, on March 2, 2023, DWR determined that the revisions were still insufficient and issued an “inadequate” finding. DWR’s detailed evaluation of the GSAs’ corrective actions is provided in verbatim below.
Deficiency 1: The corrective action advised the Agencies to define sustainable management criteria for the chronic lowering of groundwater levels. The corrective action also advised the 1877
California Water Service Company 31 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
Agencies that if the GSPs intend to rely on mitigation actions to address impacts as a means to support the reasonableness of their sustainable management criteria then the GSPs should be revised to include specific details that will allow the Department to assess their feasibility and likely effectiveness. It is never expressly made clear what specific conditions the Plans are meant to avoid, which causes uncertainty in how the basin will be managed to achieve sustainability and precludes or impairs the Department’s ability to evaluate the likelihood of the Plan to attain sustainability goals, and would prevent the Department and the public at large from monitoring progress towards any sustainability goal under that Plan. The minimum thresholds selected have not been selected based on the avoidance of undesirable results and significant and unreasonable impacts to beneficial uses and users. The Plan does not consider how minimum thresholds developed for one sustainability indicator will affect other related sustainability indicators. Also, the level of commitment to the Mitigation Framework and Mitigation Plans is unclear to the Department and the Department is unable assess the feasibility and likely effectiveness of the mitigation program(s). The Staff Report indicates that the Agencies did not take sufficient actions to correct this deficiency, which materially affects the ability of the Agencies to achieve sustainability and the ability of the Department to evaluate the likelihood of the Plan to achieve sustainability.
Deficiency 2: The corrective action advised the Agencies to define sustainable management criteria for the Mid-Kaweah Groundwater Sustainability Agency and Greater Kaweah Groundwater Sustainability Agency areas, and explain how minimum thresholds in the vicinity of identified critical infrastructure (i.e. the Friant Kern Canal) will not substantially interfere with the Canal’s use. The Plan does not explain how it was determined that approximately 10 inches or greater amount of subsidence would result in a 10% or more capacity loss in the Subbasin’s conveyance infrastructure. Department staff are still not fully able to evaluate how the management criteria for chronic lowering of groundwater levels will affect potentially localized inelastic subsidence which is a permanent condition in relation to water levels that may decline and rebound over time. The Staff Report indicates that the Agencies did not take sufficient actions to correct this deficiency, which materially affects the ability of the Agencies to achieve sustainability and the ability of the Department to evaluate the likelihood of the Plan to achieve sustainability.
Deficiency 3: The corrective action advised the Agencies to define sustainable management criteria for the East Kaweah Groundwater Sustainability Agency and Greater Kaweah Groundwater Sustainability Agency areas or if the GSAs do not have sufficient information at this time, they should identify depletion of interconnected surface water as a data gap and provide a plan to close the data gap as soon as possible. The resubmitted GSPs identify data gaps and propose the creation of a Work Plan culminating in the incorporation of key data into the 2025 GSP Update and set preliminary sustainable management criteria to be refined upon further research and data collection. While not yet fully consistent with the requirements of the GSP Regulations, the Agencies’ efforts to address this deficiency are sufficient at this time, although further efforts and revisions will be required in subsequent GSP updates to align the sustainable management criteria for interconnected surface water with the GSP Regulations and Department guidance.
1878
California Water Service Company 32 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
The GSAs have continued to make substantial progress in resolving the deficiencies previously identified by DWR, working closely with staff from the State Water Resources Control Board (SWRCB). In June 2024, the GSAs released three draft amended GSPs for public review and SWRCB feedback. After receiving comments from both the Board and the public, the GSAs prepared updated versions and issued the revised GSPs for review in October 2024. Subsequently, the GSAs adopted these updated plans in November 2024.
A probationary hearing had originally been scheduled for January 7, 2025; however, SWRCB postponed the hearing to allow additional time to evaluate the newly adopted 2024 GSPs. On December 2, 2025, the SWRCB adopted a resolution determining that a probationary designation was not necessary, and the Kaweah Subbasin would return to DWR oversight. DWR has not yet re-evaluated these 2024 amended GSPs and issued a new determination.
The long-term impacts of SGMA implementation in the Subbasin are not yet certain. The discussion of groundwater reliability within the Subbasin in this WSA is based on the recently adopted MKGSA and GKGSA 2024 GSPs, which include the projected water demands for Cal Water’s Visalia District in the Water Budget’s projections for the municipal and industrial pumping.
6.2.2.2.2 Sustainable Management Criteria
The GKGSA and MKGSA 2024 GSPs establish sustainable management criteria for groundwater levels in both the upper and lower aquifers of the Subbasin. Under the plans, Undesirable Results are triggered when groundwater elevations fall below the Minimum Thresholds (MTs) that are tied to the number of potentially impacted domestic wells and the GSAs’ ability to implement mitigation actions for affected beneficial uses. These MTs were developed through the Subbasinwide evaluation of annual groundwater level conditions and refined through collaboration among GSA staff, technical teams, and local stakeholders. Based on this analysis, the MKGSA and GKGSA determined that Undesirable Results would not occur if groundwater levels remain above the established MTs.
Groundwater level representative monitoring wells (RMWs) used for tracking conditions are identified in the 2024 GSPs. Current MTs in these wells average 44 feet below Fall 2022 water levels. In Water Year (WY) 2023, the Subbasin reported groundwater levels that exceeded several MTs, most notably in areas within or near the Visalia System. During the same period, the Subbasin recorded approximately 997,000 acre-feet of groundwater storage increase (Provost & Pritchard, 2024).
The MKGSA and GKGSA 2024 GSPs also establish management criteria for nine primary drinking water constituents, referencing state Maximum Contaminant Levels (MCLs). In WY 2023, nitrogen was the primary constituent of concern (COC). This constituent is tied to legacy conditions and long-term practices evaluated through the Irrigated Lands Regulatory Program (ILRP). 1879
California Water Service Company 33 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
6.2.2.2.3 Groundwater Allocations and Water Budgets
Groundwater allocations are already being used in the Subbasin for agricultural water users. The GKGSA and MKGSA create and enforce the rules for these allocations. These rules do not apply to municipal and industrial users.
Each year before the new water year begins, the GKGSA announces how much water per acre landowners can use. This allocation has two parts:
1. Native sustainable yield: Every acre of land gets 0.62 AF of groundwater for free. This amount represents the long‑term, sustainable amount of water available in the Subbasin.
2. Temporary allocations (Tier 1 and Tier 2): These are additional amounts of water based on past overdraft in the area. They will be reduced over time and are only available to land that has been historically irrigated. Landowners must pay to use this water, and Tier 2 costs more than Tier 1. Water use is counted in this order: first the free native yield, then Tier 1, and finally Tier 2.
For WY 2024, landowners with historically irrigated acreage in the GKGSA receive 0.62 AF native yield, 0.56 AF from Tier 1, and 0.69 AF from Tier 2 for a total of 1.87 AF per acre (GKGSA, 2024).
MKGSA uses a similar system. For WY 2024, MKGSA provides 0.83 AF per acre of native yield, 0.5 AF per acre from Tier 1, and 0.5 AF per acre from Tier 2 for a total of 1.83 AF per acre (MKGSA, 2024).
MKGSA set this groundwater allocation after creating an Emergency Ordinance in 2022 to limit how much groundwater farmers could pump. The ordinance was later extended and changed in 2023 to reduce pumping even more.
When the ordinance first passed, the MKGSA set a limit of 2.5 AF of water per acre per year for farms larger than four acres. This amount was based on how much groundwater the Subbasin can naturally supply and how much water the Water Accounting Framework said each parcel could use. If a farmer used less water than their limit, they were allowed to carry all the unused amount into the next year.
In October 2023, the MKGSA changed the rule again for WY 2024, lowering the limit from 2.5 AF/acre to 1.83 AF/acre. Of this amount, 0.83 AF/acre is the sustainable native groundwater supply.
The remaining water was based on how much water TID added back into the aquifer in WY 2023.
Under this update, only water that had been recharged into the groundwater system could be allocated for future use.
These pumping limits do not apply to cities or other municipal water users. The District stays involved in these decisions by serving on the GKGSA Board and Technical Advisory Subcommittee and participating in the MKGSA Advisory Subcommittee, so it can stay informed and involved in any future allocation or pumping‑limit discussions.
1880
California Water Service Company 34 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
The Proposed Project site has historically been used for production of wheat and almond crops.
Approximately 43 acres of the site has been used for wheat crops with an additional 25 acres for almonds. In WY 2024, the site had a pumping allocation based solely on the GKGSA. Using the GKGSA groundwater allocation rate of 1.87 AF per acre, the site would have received a total pumping allocation of approximately 127 AFY. While these allocations will not apply to the Proposed Project, agricultural activities will cease and temporary groundwater allocations are planned for eventual phase-out, it is relevant that the site historically received a Subbasin groundwater allocation.
The Water Budget supporting the MKGSA and GKGSA 2024 GSPs include an updated estimate of groundwater demand associated with projected urban growth within the City of Visalia. These projections anticipate higher pumping needs than those reflected in the District’s 2020 UWMP.
For example, both the MKGSA and GKGSA 2024 GSPs incorporate an estimated municipal water demand of approximately 54,987 AFY by 2040, an increase of roughly 13,729 AFY above the 2040 demand identified in the 2020 UWMP (GKGSA, 2024).
The Proposed Project and other anticipated development within the Visalia area are not directly accounted for in the 2020 UWMP; however, these demands are implicitly included in the Subbasin-wide Water Budget and in the GSP’s 2040 projections (for instance, the projected demands associated with the Proposed Project and other planned developments total approximately 42,923 AFY in 2040).
6.2.3 Groundwater Use and Supply
The District has a total of 59 active wells located within the Visalia PWS, two wells within the Mullen PWS, and one well within the Tulco PWS service area boundaries. Under CWC §10910(f)(3) and CGC §66473.7(2)(A), the volume of groundwater extracted by Cal Water within the District, including pumping historically associated with the Proposed Project site and adjacent development areas, must be evaluated. Table 6-1 summarizes groundwater pumping from 2004- 2024. Available groundwater supplies have historically been sufficient to meet all recorded demands.
Table 6-3 provides the District’s projected groundwater pumping through 2045 under normal hydrologic conditions. The District’s 2020 UWMP anticipates continued reliance on groundwater as a primary supply source through 2045 to satisfy all projected demands. Groundwater demands associated with the Proposed Project and other planned developments were not included in the 2020 UWMP. Consequently, these additional demands are conservatively added to the UWMP projections. Although the Project will increase total pumping, groundwater use is expected to remain below the volumes assumed in the relevant 2024 GSPs.
To maintain a dependable water supply for both existing and future customers, Cal Water implements an ongoing asset management program that prioritizes system reliability. This program includes proactive maintenance, facility upgrades, and improvements to aging infrastructure to preserve operational performance. Through continued reinvestment in system 1881
California Water Service Company 35 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
assets and strategic expansion, Cal Water is positioned to meet long-term service demands throughout the District.
6.2.4 Analysis of Sufficiency of Groundwater Supply
The District’s only water source is groundwater from the discussed Subbasins. While the 2020 UWMP projects adequate groundwater supply under all conditions for the District overall, the proposed Project’s demands were not included in those projections. Therefore, an analysis of groundwater sufficiency to meet Project demands is required under CWC §10910(f)(5) and CGC §66473.7(a)(2)(E).
Groundwater supplies have historically met all District demands, and projected pumping (including the Proposed Project and other known developments) remains below the municipal volumes evaluated in the water budgets supporting the 2024 GSPs. District pumping represents a relatively small portion of total Subbasin groundwater use, most of which is agricultural. In WY 2023, the District pumped 28,159 AFY, accounting for about 49% of municipal and industrial pumping and approximately 9.1% of total Subbasin pumping (Cal Water, 2025).
While SGMA implementation introduces some long‑term uncertainty, the primary driver of Subbasin sustainability will continue to be agricultural pumping, which far exceeds urban use.
District pumping consistent with the adopted GSPs is not expected to adversely affect other groundwater users. Over time, growth within the District will likely replace irrigated agricultural land with urban development, which generally reduces overall consumptive use on a per‑acre basis.
Cal Water’s groundwater rights, established through overlying and appropriative use and dedicated to public service, are protected under CPUC requirements and California water law.
Municipal and domestic uses hold priority over other water uses under CWC §§106 and 106.5.
SGMA is intended to preserve, not alter, existing water rights. While SGMA implementation and the 2024 GSPs are not expected to limit groundwater availability for meeting projected District demands, future actions by the GKGSA, MKGSA, or the State Water Resources Control Board could introduce groundwater allocations, reporting requirements, or extraction-related fees.
6.2.4.1 Sustainable Yield Analysis
Groundwater from the Kaweah and Tule Subbasins has historically been sufficient to meet the Visalia District’s demands. District pumping decreased during and after the 2012–2015 drought due to conservation measures, with average use falling to about 27,736 AFY between 2014 and 2019 compared to about 32,502 AFY in the prior decade.
It is also important to note that most groundwater pumping in the Kaweah Subbasin is for agricultural use. According to the Mid‑Kaweah GSP water budget, average pumping from 1981– 2017 was about 754,415 AFY, including roughly 685,375 AFY for irrigation and 69,040 AFY for municipal and industrial uses. This means M&I pumping represents about 9% of total use, and District pumping accounts for only a portion of that amount. 1882
California Water Service Company 36 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
Groundwater conditions in the Tule Subbasin show a similar pattern. As described in the Tule East GSP, average pumping from 1986/87 through 2016/17 was about 712,200 AFY, with approximately 664,000 AFY used for agriculture and 19,400 AFY used for M&I purposes. District pumping in the Mullen System represents only a very small share of this M&I total.
Under state law, it’s important to recognize that some farms and businesses in the District’s service area use groundwater from the Subbasin even though they don’t get water from the District. The Proposed Project will not affect these users because the District’s groundwater pumping follows the rules in the GKGSA and MKGSA groundwater plans.
Given the District’s proven ability to meet historical and the absence of any indication from GSAs in the Tule or Kaweah Subbasins that urban pumping will be restricted under GSP implementation, it is reasonable to conclude that groundwater from the Subbasins will be sufficient to meet the District’s needs, including the Proposed Project.
Cal Water holds groundwater rights as both an overlying owner and appropriator, and these rights have been dedicated to public use. Under CPUC regulations, Cal Water must provide water to all customers within its service area under reasonable rules. California law prioritizes municipal water rights over other uses, including under SGMA. Domestic water use is recognized as the “highest use” of water in the state (CWC §106), and urban water purveyors’ rights are protected to ensure both current and future needs (CWC §106.5).
SGMA was designed to preserve the security of water rights in the state to the greatest extent possible and does not alter or redefine surface or groundwater rights or priorities (CWC §§10720.1(b), 10720.5(a)-(b)). SGMA should not reduce, adversely impact, or limit Cal Water’s present or future exercise of its domestic water rights or its obligation to serve its municipal customers, and Cal Water’s rights should be subject to less restrictions and limitations than any other types of water rights or uses.
As the District grows (the District’s UWMP projects that service area population will increase by more than 50% over the next 25 years), some land currently used for irrigated agriculture is expected to transition to residential and commercial development. Because agriculture generally uses more water per acre than urban land uses, this land‑use change is likely to reduce overall groundwater demand within the subbasins over time.
6.3 Historical and Current Water Supplies
As discussed in Section 6.2 above, demands in the District are met entirely by groundwater pumped from Kaweah Subbasin. Historical groundwater supply volumes are catalogued in Table 6-1 and Figure 6-2.
1883
California Water Service Company 37 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
TABLE 6-1: HISTORICAL WATER SUPPLY FOR THE VISALIA DISTRICT (2004-2024) Groundwater Total Water Supply
2004 32,486 32,486
2005 30,701 30,701
2006 32,032 32,032
2007 34,625 34,625
2008 34,848 34,848
2009 34,065 34,065
2010 31,762 31,762
2011 30,260 30,260
2012 31,400 31,400
2013 32,360 32,360
2014 29,475 29,475
2015 24,675 24,675
2016 25,677 25,677
2017 27,698 27,698
2018 29,073 29,073
2019 28,654 28,654
2020 30,172 30,172
2021 30,166 30,166
2022 29,410 29,410
2023 27,985 27,985
2024 29,550 29,550
1884
California Water Service Company 38 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
FIGURE 6-2. HISTORICAL 20-Year WATER SUPPLY (2004-2024), VISALIA DISTRICT 40,000
35,000
:;:- 30,000 LL
~
~ 25,000 0.
:::,
Vl
~ 20,000
"'
~
"' u 15,000
·s
.!!!
I 10,000
5,000
0 ■ Groundwater
1885
California Water Service Company 39 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
6.4 Projected Water Supplies
The District’s 2020 UWMP projects that groundwater production will continue to meet and exceed District demands for the foreseeable future (Cal Water, 2021). Table 6-2 and Figure 6-3 display the forecasted groundwater supplies, which are assumed to be equal to the forecasted demands.
TABLE 6-2: HISTORICAL AND PROJECTED GROUNDWATER PRODUCTION 2004-2045 (AFY)
Historical
Groundwater
Production
Projected
Groundwater
Production
(2020 UWMP)
Projected
Groundwater
Production
(Proposed
Project)
Projected
Groundwater
Production
(Other New
Development)
Total Projected
Groundwater
Production
2004 32,486 - - - -
2005 30,701 - - - -
2006 32,032 - - - -
2007 34,625 - - - -
2008 34,848 - - - -
2009 34,065 - - - -
2010 31,762 - - - -
2011 30,260 - - - -
2012 31,400 - - - -
2013 32,360 - - - -
2014 29,475 - - - -
2015 24,675 - - - -
2016 25,677 - - - -
2017 27,698 - - - -
2018 29,073 - - - -
2019 28,654 - - - -
2020 30,172 - - - -
2021 30,166 - - - -
2022 29,410 - - - -
2023 27,985 - - - -
2024 29,550 - - - -
2025 - 32,520 - - 32,520
2030 - 35,276 209 821 36,305
2035 - 38,310 209 999 39,517
2040 - 41,258 209 1,456 42,923
2045 - 44,529 209 1,623 46,361
1886
California Water Service Company 40 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
FIGURE 6-3. HISTORICAL (2004-2024) AND PROJECTED (2025-2045) GROUNDWATER
PRODUCTION
45,000
40,000
35,000
30,000
25,000
20,000
15,000
10,000
5,000
0 N N N N 0 0 0 0 0 0 0 0 """V, (J') --.J
NNNNNN
000000
0 0
N N N N N N N N N N N N N 0 0 0 0 0 0 0 0 0 0 0 0 0 NNNNNNW 00 I..O 0 N W .i:,. v, O"I --.J 00 I..O O N W .i:,. v, 0 ■ Historical Groundwater Production ■ Projected Groundwater Production N N N 0 0 0
w"""""" V, 0 V,
1887
California Water Service Company 41 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
6.5 Water Conservation & Demand Management
The Visalia District is subject to the administration of Cal Water’s conservation programs, which are described in detail in the District’s 2020 UWMP (Cal Water, 2021). These programs are designed to ensure water reliability during normal and shortage conditions and include staged response actions outlined in the District’s Water Shortage Contingency Plan (WSCP). The District’s Conservation Master Plan integrates with actions described in its UWMP and WSCP by providing guidance for ongoing conservation programs, including appliance and turf rebates and public education. As described in the District’s 2020 UWMP, Cal Water’s demand management policies largely fit into the following categories: water waste prevention ordinances, metering, conservation pricing, public education and outreach, and management of real distribution system losses.
6.6 Water Supply Availability in Normal, Single Dry, and Multiple Dry Years CWC § 10910 (c)(3) If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water system's total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water system's existing and planned future uses, including agricultural and manufacturing uses.
The following estimates of supplies in normal, single dry, and multiple dry year hydrologic conditions are derived from the District’s 2020 UWMP (Cal Water, 2021). According to the District’s 2020 UWMP, its available groundwater supplies “…are expected to be sufficient to meet projected water demands of the District under all hydrologic conditions, including normal, single dry, and multiple dry years.” As the District only pumps the groundwater volume necessary to meet demands, reported supply volumes in this analysis do not represent the total available supply, and instead reflect that supplies are expected to be adequate to meet future demands, regardless of hydrologic conditions.
Historically, the District has not experienced supply shortfalls, even in years with higher demands than those forecasted. The District has been able to meet demands up to 34,848 AFY without experiencing any supply constraints.
6.6.1 Normal Year
A normal hydrologic year represents the supplies available under normal conditions. The UWMP uses 1991 climatic conditions to represent a normal year. In a normal year, the District’s potable water supplies are expected to meet all demands inclusive of the proposed Project (“Clements Ranch Development” in the following tables and figures), as shown in Table 6-3 and Figure 6-4. 1888
California Water Service Company 42 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
TABLE 6-3: PROJECTED NORMAL YEAR WATER SUPPLY AND DEMAND (AFY) 2025 2030 2035 2040 2045
Total Supply 32,520 36,305 39,517 42,923 46,361
Visalia District Demand 32,520 35,276 38,310 41,258 44,529 Clements Ranch
Demand 0 209 209 209 209
Other Developments 0 821 999 1,456 1,623
Total Potable Water
Demand Inclusive of
Project
32,520 36,305 39,517 42,923 46,361
Difference 0 0 0 0 0
Supply Shortfall (% of
Demand) None None None None None
FIGURE 6-4. HISTORICAL (2004-2024) AND PROJECTED (2025-2045) NORMAL YEAR WATER
SUPPLY AND DEMAND
60,000
50,000
s:-
u..
~
-g 40,000 re
E
w
0 -g 30,000 re
>,
c..
C.
~ 20,000
w
-re
~ 10,000
0 N N 0 0
~ 0
U"1
N N N N N N 0 0 0 0
0 0 0 0 s s
°' -.J 0, <D 0
Historical Demand (Visalia District)
- Clements Ranch Development
- - Historical Supplies
N N N
s s s N UJ .i,.
N
s
U"1
N N N N N N N N N N N N N
s s s s 0 0 0 0 0 0 0 0
N N N N N N UJ UJ ~
°' -.J 0, <D 0 N UJ .i,. U"1 0 U"1 0
- Projected Normal Vear Demand (Visalia District)
- other Developments
Projected Supplies
N
~ U"1
1889
California Water Service Company 43 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
6.6.2 Single Dry Year
A single dry year represents the lowest available water supply. As described above, groundwater supplies are expected to be able to meet all demands in all year types. Therefore, supply changes from a normal to single dry year are based upon forecasted usage reductions and other demand regulations, as forecasted in the District’s 2020 UWMP (Cal Water, 2021). During a single dry year, supplies are projected to meet District demands inclusive of proposed Project demands and other development demands, as shown in Table 6-4 and Figure 6-5.
TABLE 6-4: PROJECTED SINGLE DRY YEAR WATER SUPPLY AND DEMAND (AFY) 2025 2030 2035 2040 2045
Total Supply 33,152 36,992 40,265 43,728 47,232
Visalia District Demand 33,152 35,962 39,057 42,063 45,400 Clements Ranch Demand 0 209 209 209 209
Other Developments 0 821 999 1,456 1,623
Total Potable Water Demand
Inclusive of Project 33,152 36,992 40,265 43,728 47,232 Difference 0 0 0 0 0
Supply Shortfall (% of Demand) None None None None None 1890
California Water Service Company 44 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
FIGURE 6-5. HISTORICAL (2004-2024) AND PROJECTED (2025-2045) SINGLE DRY YEAR WATER
SUPPLY AND DEMAND
6.6.3 Multiple Dry Years
Multiple dry years represent the driest consecutive 5-year period, or the 5-year period with the lowest available water supply. The UWMP uses 2011-2015, which was the driest 5-year period within the range of years of 1980-2019. As described above, groundwater supplies are expected to be able to meet all demands in all year types. Therefore, supply changes from a normal year to multiple dry years are based upon forecasted usage reductions and other demand regulations.
In a multiple dry year scenario, supplies are projected to meet the District’s demands, including proposed Project demands and other development demands, as shown in Table 6-5. Figure 6-6 displays supplies and demands in the multiple dry year scenario for 2025 to 2045. 50,000
45,000
f 40,000
~
-g 35,000
'1l
E
Q)
0 30,000
-g 25,000 '1l
>,
i5. 20,000 C.
::l
~ 15,000
! > 10,000
5,000
0 -- ........ -
0 ,- N ,.... ,.... ,.... 0 0 0
N N N
m st ,.... ,.... 0 0
N N
----.... .,, ....
~ ~ ~ ~ ~ 0 ,- N <Y'l ~ ~ 0 ~ 0 ~
o o o o o ~ ~ ~ ~ ~ ~ ~ ~ S S
N N N N N N N N N N N N N N N
- Other Developments - Clements Ranch Development
- Proj ected Single-Dry Year Demand (Visalia Distri ct) Historical Demand (Visalia District) - - Historical Supplies - - Projected Supplies
1891
California Water Service Company 45 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
TABLE 6-5: PROJECTED MULTIPLE DRY YEAR WATER SUPPLY AND DEMAND (AFY) Start Year 2025 2030 2035 2040 2045
Year # 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 Total
Supply 33,543 33,543 33,543 33,543 33,543 37,417 37,417 37,417 37,417 37,417 40,728 40,728 40,728 40,728 40,728 44,227 44,227 44,227 44,227 44,227 47,771 47,771 47,771 47,771 47,771 Visalia
District 33,543 33,543 33,543 33,543 33,543 36,387 36,387 36,387 36,387 36,387 39,520 39,520 39,520 39,520 39,520 42,562 42,562 42,562 42,562 42,562 45,939 45,939 45,939 45,939 45,939 Clements
Ranch
Development - - - - - 209 209 209 209 209 209 209 209 209 209 209 209 209 209 209 209 209 209 209 209 Other
Developments - - - - - 821 821 821 821 821 999 999 999 999 999 1,456 1,456 1,456 1,456 1,456 1,623 1,623 1,623 1,623 1,623 Total
Potable
Water
Demand
33,543 33,543 33,543 33,543 33,543 37,417 37,417 37,417 37,417 37,417 40,728 40,728 40,728 40,728 40,728 44,227 44,227 44,227 44,227 44,227 47,771 47,771 47,771 47,771 47,771 Supply
Shortfall
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% FIGURE 6-6. PROJECTED MULTIPLE DRY YEAR WATER SUPPLY AND DEMAND 50,000
45,000 40,000
f 35,000
$
" 30,000
0 25,000
ro
_;,;.
0. g- 20,000 V,
JI!
;: 15,000
10,000
5,000
0 2025 2030
- Projected Visalia District Multiple Dry Year Demand
2035 2040 2045
- Clements Ranch Development - Other Developments Projected Total Supplies 1892
California Water Service Company 46 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
7. WATER SUPPLY SUFFICIENCY
7.1 Comparison of Supply & Demand
CWC § 10910 (c)(3) If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water system's total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water system's existing and planned future uses, including agricultural and manufacturing uses.
CGC § 66473.7 (a)(2) "Sufficient water supply" means the total water supplies available during normal, single-dry, and multipledry years within a 20-year projection that will meet the projected demand associated with the proposed subdivision, in addition to existing and planned future uses, including, but not limited to, agricultural and industrial uses. In determining "sufficient water supply," all of the following factors shall be considered:
(A) The availability of water supplies over a historical record of at least 20 years. (B) The applicability of an urban water shortage contingency analysis prepared pursuant to Section 10632 of the Water Code that includes actions to be undertaken by the public water system in response to water supply shortages. (C) The reduction in water supply allocated to a specific water use sector pursuant to a resolution or ordinance adopted, or a contract entered into, by the public water system, as long as that resolution, ordinance, or contract does not conflict with Section 354 of the Water Code.
(D) The amount of water that the water supplier can reasonably rely on receiving from other water supply projects, such as conjunctive use, reclaimed water, water conservation, and water transfer, including programs identified under federal, state, and local water initiatives such as CALFED and Colorado River tentative agreements, to the extent that these water supplies meet the criteria of subdivision (d).
(a)(3) If the written verification provided by the applicable public water system indicates that the public water system is unable to provide a sufficient water supply that will meet the projected demand associated with the proposed subdivision, then the local agency may make a finding, after consideration of the written verification by the applicable public water system, that additional water supplies not accounted for by the public water system are, or will be, available prior to completion of the subdivision that will satisfy the requirements of this section. This finding shall be made on the record and supported by substantial evidence.
(e) If there is no public water system, the local agency shall make a written finding of sufficient water supply based on the evidentiary requirements of subdivisions (c) and (d) and identify the mechanism for providing water to the subdivision. (f) In making any findings or determinations under this section, a local agency, or designated advisory agency, may work in conjunction with the project applicant and the public water system to secure water supplies sufficient to satisfy the demands of the proposed subdivision. If the local agency secures water supplies pursuant to this subdivision, which supplies are acceptable to and approved by the governing body of the public water system as suitable for delivery to customers, it shall work in conjunction with the public water system to implement a plan to deliver that water supply to satisfy the long-term demands of the proposed subdivision.
CGC § 66473.7 (j) The determinations made pursuant to this section shall be consistent with the obligation of a public water system to grant a priority for the provision of available and future water resources or services to proposed housing developments that help meet the city’s or county’s share of the regional housing needs for lower income households, pursuant to Section 65589.7.
(o) Any action challenging the sufficiency of the public water system’s written verification of a sufficient water supply shall be governed by Section 66499.37.
1893
California Water Service Company 47 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
According to the Water Code, WSAs must assess whether a water purveyor’s projected supplies will be sufficient to meet its existing demands in addition to proposed Project demands in normal, single dry, and multiple dry year hydrologic scenarios. Section 6.6 provides comparisons of District demands and supplies in all required scenarios. Under all scenarios, available water supplies are expected to be sufficient to meet the District’s demands inclusive of the proposed Project and other known development demands. The District’s groundwater supplies have always met its demands, even during extended drought periods.
7.2 Finding of Water Supply Sufficiency
The analyses completed as part of this WSA find that the District’s water supply is expected to be sufficient to provide for the District’s existing demands in addition to the demands of the proposed Project. The inclusion of Project demands is not expected to lead to any actual supply shortfalls.
Cal Water is committed to the development needs of the proposed Project and will be able to provide water service, with infrastructure tailored to the proposed Project’s plans. This infrastructure includes, but is not limited to, transmission lines, distribution systems, meters, and water system monitoring. Cal Water anticipates collaborating with the Project Proponent, the City/County, and the SWRCB Division of Drinking Water throughout the design, construction, and operation phases. Cal Water will need to ensure that all current and future state standards are met regarding pipe sizes, fire flows, equipment, and materials and will be responsible for ongoing operations, maintenance, and design of any proposed constructed water facilities. Cal Water may require additional facilities to provide water service to the proposed Project depending on the pressure zone's specific needs for pressures and flows. To accomplish this, Cal Water may request dedication of parcels of land for the future needs of pumped storage and/or additional well supply. Additional evaluation may be needed to determine the optimized location and required minimum area. Cal Water’s commitment to the development needs of the proposed Project may need to be reassessed in the case of changing water supply conditions within the District and will expire five years after the date of this WSA if the proposed Project has not begun construction and made on-going progress towards completion.
1894
California Water Service Company 48 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
8. CONCLUSIONS
According to the Water Code, the purpose of a WSA is to evaluate the sufficiency of a purveyor’s water supply to meet future water demands, including those associated with the proposed Project, during normal, single dry, and multiple dry hydrologic years for a 20-year time horizon.
As described in Section 4, the total water demand of the proposed Project has been conservatively estimated. As discussed in Section 5, these demands and other development demands are considered additive to the projected water demand growth in the adopted 2020 UWMP. As discussed in Section 6, groundwater supply to the District is considered reliable based on the findings of the 2020 UWMP and review of the GSPs for the Mid-Kaweah GSA, the Greater Kaweah GSA, and the ETGSA. Therefore, sufficient water supply is estimated to be available to Cal Water to meet the future District demands inclusive of the additive demands associated with the proposed Project from 2025 through 2045 under all hydrologic conditions (i.e., current and projected, and for normal, single dry, and multiple dry years including a five-year drought period).
This WSA concludes that sufficient water supply is available to the District to meet all future demands associated with current and planned development within its service area, including those of the proposed Project. The proposed Project lies within the jurisdictions of the MKGSA and the GKGSA. Although water use for the proposed Project is currently consistent with the GKGSA and MKGSA GSPs, the GKGSA, MKGSA, or another governing entity (e.g., SWRCB) may adopt and/or implement policies or management actions that could include groundwater allocations for urban users, groundwater extraction reporting requirements, or potential fees associated with groundwater extraction in the future.
Should such policies or actions limit access to groundwater, Cal Water may need to undertake additional measures to mitigate any potential impacts on water supply reliability. 1895
California Water Service Company 49 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
9. REFERENCES
23 CCR 2.2.7 § 490-495. (2025). Title 23 of the California Code of Regulations Division 2, Chapter
2.7 Model Water Efficient Landscape Ordinance § 490-495.
AB 1572. (2023). Potable water: nonfunctional turf. Retrieved from California Legislature. Assembly Bill 1572. Chapter 849, Statutes of 2023:
https://calmatters.digitaldemocracy.org/bills/ca_202320240ab1572 Cal Water. (2019). Cal Water WSA Water Factor Tool. Developed by M. Cubed.
Cal Water. (2021). 2020 Urban Water Management Plan, Visalia District.
Cal Water. (2025). Historical water use data provided by Cal Water.
CALGreen. (2022). California Green Building Standards Code, Title 24, Part 11. Retrieved from https://codes.iccsafe.org/content/CAGBC2022P1
California Department of Water Resources. (2003). Guidebook for Implementation of Senate Bill 610.
California Department of Water Resources. (2015). Landscape, Irrigation, Water Budget Overview.
Retrieved from 2015 Model Water Efficient Landscape Ordinance Guidebook:
https://water.ca.gov/-/media/DWR-Website/Web-Pages/Programs/Water-Use-AndEfficiency/Urban-Water-Use-Efficiency/MWELO-Files/MWELO-Guidebook/C--LandscapeIrrigation-Water-Budget-Overview.pdf California Department of Water Resources. (2019). Sustainable Groundwater Management Act 2018 Basin Prioritization, State of California.
California Water Code § 10910. (2024).
California Water Code § 10912. (2024).
California Water Service. (2022; 2023; 2024). CWS Visalia Water District Water Audits. Retrieved from Water Audit Data Reports: https://wuedata.water.ca.gov/awwa_plans DWR. (2025, March 11). CADWR Land Use Viewer. Retrieved from https://gis.water.ca.gov/app/CADWRLandUseViewer/?page=home ETGSA. (2021). Revised Groundwater Sustainability Plan. Retrieved from https://ckgsa.org/wpcontent/uploads/2022/10/CKGSA-GSP-ADOPTED-2022-Update-Secure.pdf GKGSA. (2024). Second Amended November 2024 Groundwater Sustainability Plan.
MKGSA. (2024). Second Amended November 2024 Groundwater Sustainability Plan.
MKGSA. (2025). Mid Kaweah Groundwater Sustainability Agency 2024 Overview.
Provost & Pritchard. (2024). Kaweah Subbasin Water Year 2023 Annual Monitoring Report. 1896
California Water Service Company 50 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
APPENDIX A: CLEMENTS RANCH OPERATIONAL STATEMENT
1897
Visalia Clements Ranch Operational Statement
QK has prepared a Site Plan for of Assessor Parcel Numbers (APNs) 127-020-21 and -20. The Project site is to be developed as single-family homes consistent with the intent of the General Plan. The Project can move forward based on existing development code requirements, physical conditions, and the existing environment. However, we will recommend amendments to the Project site in order to reduce any significant environmental, economic, and physical impacts.
There are two lot sizes proposed for the site. The Low Density will have 50x100 lots, consistent with the low density 5,000 square foot lots. The Medium Density portion will have 38x72 lots, 2,736 square feet roughly 250 square feet below the minimum lot size. The Medium Density area will have a planned unit development to allow for smaller lot sizes, private streets and will be a gated community. There are two points of access to both the Low Density and Medium Density proposed on Lovers Lane and Sunny Side Avenue.
R-M-2 - Setbacks
Front – 15ft
Side – 4ft / Corner- 10 feet
Rear – 15 feet
The proposed Project will maintain its consistency with the City of Visalia General Plan as much as possible. The Project site is located southeast of the City of Visalia (City), adjacent to the city limits (Urban Growth Boundary II). The site consists of two separate APNs, which total roughly 75 acres.
The Project site has three existing General Plan land use designations: Residential Low-Density, Residential Medium-Density, and Residential High-Density. As a facet of the Project, the General Plan land uses are proposed to be rearranged within the overall Project site. The proposal to shift the land uses is to make the Project site more developable and allow for each land use to have better access and circulation. The land use arrangement will take into account local General Plan and Municipal Code policies, in addition to State Law (SB 330), Senate Bill 330, or the Housing Crisis Act of 2019, which facilitates housing production in California. SB 330 addresses the State’s housing crisis in multiple parts. However, the one regulation that is applicable to the alteration of land uses is commonly referred to as the “No Net Loss” provision.
SB 330 prohibits the redesignation of land where housing is an allowable use by changing or applying general plan, specific plan, or zoning criteria that would reduce the intensity of land use below that which was allowable on January 1, 2018. There is an exception to this; a reduction in housing intensity is allowed if the reduced density is concurrently made up elsewhere within the jurisdiction.
Therefore, as a part of the Project design, the General Plan land use amendment must have a net zero change as it relates to density. The site will rearrange the existing land uses in a manner that does not reduce residential density or land use types.
The Project will require the establishment of a Zoning District that is consistent with the underlying General Plan land use. Below is a list of the Zone Districts that will be established consistently with the land use. The allowed densities are shown in Table 2. 1898
• High-Density Residential Land Use – R-M-3 (Multi-family Residential 1,200 SF Lots) • Medium-Density Residential Land Use – R-M-2 (Multi-family Residential 3,000 SF Lots) • Low-Density Residential Land Use - R-1-5 (Single-family Residential 5,000 SF Lots) The Trail section on the proposed map is intended to be dedicated to the city for further build out. 1899
California Water Service Company 51 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
APPENDIX B: CLEMENTS RANCH SITE PLAN
1900
~ - ••• ~. -- ----- -- 11 7'=
FFff
I
I;
:1
11 ,1
,1
--- --7:
,I
'1
/1
~~="~oo!: I
'1
I I
I
I! I
I! I
I I
:1 1,~ L....:__y
II
II
I
..='!!:?I I H~- II _J: 1,
SCCOOHI.H"
'-=-==-=-=-=-=-==---_J_ - -- - --=
,----
7 ---i-
/
FUTURE
PHASE
COHSIRIK:1 arr
C!.118NIDGU11£1t1YP.
'"'
COHSll!LCI~~
STNIONKJs.o£ll'AU:;IYP.
SfAHCIW)CUR9NtfJ ~=
GtlllI)l,n'P,
PROPOSED SUMMARY TABLE
TYPrCAL PRIVATE STREET
~E: 1' • 10'
TYPICAL LOCAL ST11EET
50ll.£: 1"• 10'
rt7,,_
TYPICAL COLLECTOR STREET
CCWSl1!LC7CITY
ST~-1SIR!IT. l'rP.
.Ml...J!L.llMLS 1:RQSS Af1§IIl'. OtnUS/KRfl
5Q ' rJOO'IQfSANIJPl/&:IG5Ilif£TS
lll' r ZZ'IDfSNtlPRNAlf SlBfffS·
HArlO&N5PdCfff'BNA,ff)
Gt'O( 5f'Aff 0,/fll«:=)·
NOTES
I. PfKJPf.lm' OIi/NCR: IW10lD IJfNt CI .. DIDITS
2. ll'H:117---020---(J20NIIJ117- a2(Hl21
J. PRO.Cr:T CONIACT, o« CllMC £SC00C00 rM9J-Ml- 2<00
GENERAL INFORMATION
D.RHoooo,AmMce°"&dder 4111 W. .vi.ray A\'9/lU61
Vfsalllt, CAl/3231
(559)635-9850
ASSESSOR'S PARCEL HUIIIBER:
f27--020--020andf27--020-021
SrTE AOORESS:
Sooffleas!CornetolEutKA"8Jl<llland
SoilfhofL~lArre
SrTEAREA:
~(+I-IKl.1 AC.J
Gron(+l-715.0AC.)
:=~"/~:
PROPOSED GENERAL Pl.AN LAND USE:
ResldMtle/Low.~Medlum.and
RN/dlmllq/ High O.fl5.fy11ndeon-t1cn
EXtST1NG GENERAL Pt.AN LAND USE:
Rnlderdle/Low,RflJdontlalMedlum.and
Re~H/gh~sl-JandConSlllWllcn
EXJSTINGZONtNO:
AE20~Agrlr;,J/lufv.20-Act9Mlnlmum)
(TulanlCounty)
GATED COMMUNITY TYPICAL
SETBACK DIMENSIONS
LEGEND
SCALE:1"• 150'
CLEMENTS RANCH SITE PLAN l QIV' J
:
______________________ A_P_N_: 1_27_-0_2_0-_0_20_A __ N.:..::.D_1.:..27_-0:..:2.:..0-..:.02:..:1 _________________ ___) - .-::i:n""'-::-...;; 1901
California Water Service Company 52 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
APPENDIX C: VISALIA DISTRICT AWWA WATER AUDITS
1902
Water Audit Report for:
Reporting Year:
All volumes to be entered as: ACRE-FEET PER YEAR
Master Meter and Supply Error Adjustments
WATER SUPPLIED Pcnt: Value:
Volume from own sources: 5 30,278.782 acre-ft/yr 3 acre-ft/yr Water imported: n/a 0.000 acre-ft/yr n/a acre-ft/yr
Water exported: n/a 0.000 acre-ft/yr n/a acre-ft/yr
Enter negative % or value for under-registration
WATER SUPPLIED: 30,278.782 acre-ft/yr Enter positive % or value for over-registration .
AUTHORIZED CONSUMPTION
Billed metered: 7 29,319.161 acre-ft/yr
Billed unmetered: n/a 0.000 acre-ft/yr
Unbilled metered: n/a 0.000 acre-ft/yr Pcnt: Value:
Unbilled unmetered: 5 75.697 acre-ft/yr 1.25% acre-ft/yr AUTHORIZED CONSUMPTION: 29,394.858 acre-ft/yr
WATER LOSSES (Water Supplied - Authorized Consumption) 883.923 acre-ft/yr Apparent Losses Pcnt: Value:
Unauthorized consumption: 75.697 acre-ft/yr 0.25% acre-ft/yr Customer metering inaccuracies: 5 598.350 acre-ft/yr 2.00% acre-ft/yr Systematic data handling errors: 73.298 acre-ft/yr 0.25% acre-ft/yr Apparent Losses: 747.345 acre-ft/yr
Real Losses (Current Annual Real Losses or CARL)
Real Losses = Water Losses - Apparent Losses: 136.578 acre-ft/yr WATER LOSSES: 883.923 acre-ft/yr
NON-REVENUE WATER
NON-REVENUE WATER: 959.620 acre-ft/yr
= Water Losses + Unbilled Metered + Unbilled Unmetered
SYSTEM DATA
Length of mains: 8 612.3 miles
Number of active AND inactive service connections: 9 47,217 Service connection density: 77 conn./mile main
Yes
Average length of customer service line: 10 ft
Average operating pressure: 7 55.0 psi
COST DATA
Total annual cost of operating water system: 10 $25,624,618 $/Year Customer retail unit cost (applied to Apparent Losses): 10 $1.62 Variable production cost (applied to Real Losses): 5 $93.24 $/acre-ft WATER AUDIT DATA VALIDITY SCORE:
PRIORITY AREAS FOR ATTENTION:
1: Volume from own sources
2: Customer metering inaccuracies
3: Variable production cost (applied to Real Losses)
Based on the information provided, audit accuracy can be improved by addressing the following components:
$/100 cubic feet (ccf)
0.000
<----------- Enter grading in column 'E' and 'J' ----------> Default option selected for unauthorized consumption - a grading of 5 is applied but not displayed *** YOUR SCORE IS: 63 out of 100 ***
A weighted scale for the components of consumption and water loss is included in the calculation of the Water Audit Data Validity Score
0.000
0.000
Default option selected for Systematic data handling errors - a grading of 5 is applied but not displayed Average length of customer service line has been set to zero and a data grading score of 10 has been applied Are customer meters typically located at the curbstop or property line? AWWA Free Water Audit Software:
Reporting Worksheet
75.697
2021 1/2021 - 12/2021
CWS VIS Visalia (CA5410016)
?
?
?
?
?
? Click to access definition
?
?
?
?
?
?
Please enter data in the white cells below. Where available, metered values should be used; if metered values are unavailable please estimate a value. Indicate your confidence in the accuracy of the ?
?
?
?
?
?
(length of service line, beyond the property
boundary, that is the responsibility of the utility)
Use buttons to select
percentage of water
supplied
OR
value
Click here: ?
for help using option
buttons below
?
?
?
?
+
+ Click to add a comment
WAS v5.0
+
+
+
+
+
+
American Water Works Association.
?
?
?
+
+
+
+
+
+
+
+
+
+
+
+
+ Use Customer Retail Unit Cost to value real losses
?
To select the correct data grading for each input, determine the highest grade where AWWA Free Water Audit Software v5.0 Reporting Worksheet 1 • 1a======~I
- l'--____ _,I
I I
11§1 ll§§ g : 11
-- 0 @7
I I
-
51~~ [ O @ii
-I I t
I I
"' -- I I I I (e) r ) II I
::c11 I I t•J < l II I
I I (eJ I I I
-I I
-I I
I I
-I I
l!EII
I I
--
--□I I
ii§I II I
□
I I
I I
I I
I I
1903
Water Audit Report for:
Audit Year:
All volumes to be entered as: ACRE-FEET PER YEAR
WATER SUPPLIED choose entry option:
VOS Volume from Own Sources: n g 5 29,488.709 Acre-ft/Yr n g 8 9.00% volume acre-ft/yr over-registration VOSEA WI Water Imported: n g n/a 0.000 Acre-ft/Yr n g n/a 10.00% volume acre-ft/yr WIEA WE Water Exported: n g n/a 0.000 Acre-ft/Yr n g n/a 8.00% volume acre-ft/yr WEEA 29,470.201 Acre-ft/Yr
.
AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 8 28,584.114 Acre-ft/Yr
BUAC Billed Unmetered: n g n/a 0.000 Acre-ft/Yr
UMAC Unbilled Metered: n g n/a 0.000 Acre-ft/Yr choose entry option:
UUAC Unbilled Unmetered: n g 3 71.460 Acre-ft/Yr 0.25% default acre-ft/yr Default option selected for Unbilled Unmetered, with automatic data grading of 3 28,655.575 Acre-ft/Yr
WATER LOSSES 814.627 Acre-ft/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:
SDHE Systematic Data Handling Errors: n g 3 71.460 Acre-ft/Yr 0.25% default acre-ft/yr CMI Customer Metering Inaccuracies: n g 6 583.349 Acre-ft/Yr 2.00% percent acre-ft/yr under-registration UC Unauthorized Consumption: n g 3 71.460 Acre-ft/Yr 0.25% default acre-ft/yr Default option selected for Unauthorized Consumption, with automatic data grading of 3 726.270 Acre-ft/Yr
Real Losses
88.357 Acre-ft/Yr
814.627 Acre-ft/Yr
NON-REVENUE WATER
886.087 Acre-ft/Yr
SYSTEM DATA
Lm Length of mains: n g 10 627.4 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 8 47,991 (active and inactive) Service connection density: 76 conn./mile main
Yes
Lp Average length of (private) customer service line: n g 10 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 8 62.9 psi
COST DATA
CRUC Customer Retail Unit Charge: n g 10 $1.65
VPC Variable Production Cost: n g 10 $104.24 $/acre-ft $/yr (optional input) WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:
Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:
1: Volume from Own Sources (VOS) Unit Total Losses: gal/conn/day 2: Billed Metered (BMAC) Unit Apparent Losses: gal/conn/day 3: Unauthorized Consumption (UC) Unit Real LossesA
: gal/conn/day
Unit Real LossesB: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:
Worksheet
25.000
CWS VIS Visalia
18.508
Jan 01 2022 - Dec 31 2022
Water Supplied Error Adjustments
2023 Calendar Year
Real Losses:
WATER LOSSES:
Average length of customer service line has been set to zero and a data grading of 10 has been applied A weighted scale for the components of supply, consumption and water loss is included in the calculation of the Water Audit Data Validity Score *** The Water Audit Data Validity Score is in Tier III (51-70). See Dashboard tab for additional outputs. *** $/100 cubic feet (ccf)
$26,860,133
Total Annual Operating Cost
go to start page
NON-REVENUE WATER:
If entering an
Error Adjustment,
select under- or overregistration
336.000
12.000
125.000
WATER SUPPLIED:
AUTHORIZED CONSUMPTION:
Apparent Losses:
Click 'g' to determine data validity grade
Click 'n' to add notes
FWAS v6.0
American Water Works Association.
To access definitions, click the input name
To edit water system info:
AWWA Free Water Audit Software v6.0 Worksheet 1
E§ 1-----1 -
; 1-----1 -
EE 1---i -
[TI
[TI .--------------
EE ,___I-~-~
1904
Water Audit Report for:
Audit Year:
All volumes to be entered as: ACRE-FEET PER YEAR
WATER SUPPLIED choose entry option:
VOS Volume from Own Sources: n g 6 28,062.105 Acre-ft/Yr n g 8 volume acre-ft/yr over-registration VOSEA WI Water Imported: n g n/a 0.000 Acre-ft/Yr n g n/a volume acre-ft/yr WIEA WE Water Exported: n g n/a 0.000 Acre-ft/Yr n g n/a volume acre-ft/yr WEEA 28,062.105 Acre-ft/Yr
.
AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 8 27,310.882 Acre-ft/Yr
BUAC Billed Unmetered: n g n/a 0.000 Acre-ft/Yr
UMAC Unbilled Metered: n g n/a 0.000 Acre-ft/Yr choose entry option:
UUAC Unbilled Unmetered: n g 4 32.100 Acre-ft/Yr 0.25% custom acre-ft/yr 27,342.982 Acre-ft/Yr
WATER LOSSES 719.123 Acre-ft/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:
SDHE Systematic Data Handling Errors: n g 3 68.277 Acre-ft/Yr 0.25% default acre-ft/yr CMI Customer Metering Inaccuracies: n g 6 557.365 Acre-ft/Yr 2.00% percent acre-ft/yr under-registration UC Unauthorized Consumption: n g 3 68.277 Acre-ft/Yr 0.25% default acre-ft/yr Default option selected for Unauthorized Consumption, with automatic data grading of 3 693.919 Acre-ft/Yr
Real Losses
25.204 Acre-ft/Yr
719.123 Acre-ft/Yr
NON-REVENUE WATER
751.223 Acre-ft/Yr
SYSTEM DATA
Lm Length of mains: n g 10 632.4 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 8 48,540 (active and inactive) Service connection density: 77 conn./mile main
Yes
Lp Average length of (private) customer service line: n g 10 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 8 62.0 psi
COST DATA
CRUC Customer Retail Unit Charge: n g 10 $1.68
VPC Variable Production Cost: n g 10 $95.31 $/acre-ft $/yr (optional input) WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:
Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:
1: Volume from Own Sources (VOS) Unit Total Losses: gal/conn/day 2: Billed Metered (BMAC) Unit Apparent Losses: gal/conn/day 3: Unauthorized Consumption (UC) Unit Real LossesA
: gal/conn/day
Unit Real LossesB: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) go to start page
NON-REVENUE WATER:
If entering an
Error Adjustment,
select under- or
over-registration
WATER SUPPLIED:
AUTHORIZED CONSUMPTION:
Apparent Losses:
Average length of customer service line has been set to zero and a data grading of 10 has been applied A weighted scale for the components of supply, consumption and water loss is included in the calculation of the Water Audit Data Validity Score *** The Water Audit Data Validity Score is in Tier III (51-70). See Dashboard tab for additional outputs. *** $/100 cubic feet (ccf)
$27,859,185
Total Annual Operating Cost
Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:
Worksheet
32.100
CWS VIS Visalia
Jan 01 2023 - Dec 31 2023
Water Supplied Error Adjustments
2023 Calendar Year
Real Losses:
WATER LOSSES:
Click 'g' to determine data validity grade
Click 'n' to add notes
FWAS v6.0
American Water Works Association.
To access definitions, click the input name
To edit water system info:
AWWA Free Water Audit Software v6.0 Worksheet 1
E§ I~ [TI
; 11--------------
EE 11--------------
[TI
[TI ~
EE lf---------1'-------------'
1905
California Water Service Company 53 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
APPENDIX D: ESTIMATED HISTORICAL WATER USE AT PROPOSED PROJECT SITE
1906
Year Parcel ID Crop Area (acres) Method Efficiency Eto Initial (in) Eto Mid (in) Eto Late (in) Kc1 Kc2 Kc3 ETAF 1 ETAF 2 ETAF 3 ETWU1 (in) ETWU2 (in) ETWU3 (in) Sum ETWU (in) Parcel ETWU (AF) 2024 5410708 Almonds 9.64 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 54.38 2024 5434606 Almonds 10.24 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 57.76 2024 5416709 Almonds 5.95 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 33.59 2024 5416034 Almonds 12.55 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 70.80 2024 5426732 Almonds 4.85 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 27.36 2024 5404285 Wheat 7.64 Sprinkler 0.75 15.99 26.65 10.66 0.3 1.15 0.25 4.80 30.65 2.67 6.40 40.86 3.55 50.81 32.37 2024 5419926 Wheat 16.92 Sprinkler 0.75 15.99 26.65 10.66 0.3 1.15 0.25 4.80 30.65 2.67 6.40 40.86 3.55 50.81 71.66 2024 5420452 Idle (Long Term) 5.22 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2023 5410708 Almonds 9.64 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 54.38 2023 5434606 Almonds 10.24 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 57.76 2023 5416709 Young Perennials 5.95 Drip 0.81 13.325 29.31 5 10.66 0.15 0.55 0.35 2.00 16.12 3.73 2.47 19.91 4.61 26.98 13.39 2023 5416034 Almonds 12.55 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 70.80 2023 5426732 Almonds 4.85 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 27.36 2023 5404285 Wheat 7.64 Sprinkler 0.75 15.99 26.65 10.66 0.3 1.15 0.25 4.80 30.65 2.67 6.40 40.86 3.55 50.81 32.37 2023 5419926 Wheat 16.92 Sprinkler 0.75 15.99 26.65 10.66 0.3 1.15 0.25 4.80 30.65 2.67 6.40 40.86 3.55 50.81 71.66 2023 5420452 Idle (Long Term) 5.22 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2022 5410708 Almonds 9.64 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 54.38 2022 5434606 Almonds 10.24 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 57.76 2022 5416709 Young Perennials 5.95 Drip 0.81 13.325 29.31 5 10.66 0.15 0.55 0.35 2.00 16.12 3.73 2.47 19.91 4.61 26.98 13.39 2022 5416034 Almonds 12.55 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 70.80 2022 5426732 Almonds 4.85 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 27.36 2022 5404285 Idle (Long Term) 7.64 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2022 5419926 Idle (Short Term) 16.92 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2022 5420452 Idle (Long Term) 5.22 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2021 5410708 Almonds 9.64 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 54.38 2021 5434606 Almonds 10.24 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 57.76 1907
Year Parcel ID Crop Area (acres) Method Efficiency Eto Initial (in) Eto Mid (in) Eto Late (in) Kc1 Kc2 Kc3 ETAF 1 ETAF 2 ETAF 3 ETWU1 (in) ETWU2 (in) ETWU3 (in) Sum ETWU (in) Parcel ETWU (AF) 2021 5416709 Idle (Short Term) 5.95 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2021 5416034 Almonds 12.55 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 70.80 2021 5426732 Almonds 4.85 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 27.36 2021 5404285 Idle (Short Term) 7.64 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2021 5419926 Idle (Short Term) 16.92 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2021 5420452 Idle (Long Term) 5.22 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2020 5410708 Almonds 9.64 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 54.38 2020 5434606 Almonds 10.24 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 57.76 2020 5416709 Idle
(Unclassifie
d)
5.95 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2020 5416034 Almonds 12.55 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 70.80 2020 5426732 Almonds 4.85 Sprinkler 0.75 7.995 31.98 13.325 0.2 1.1 1.05 1.60 35.18 13.99 2.13 46.90 18.66 67.69 27.36 2020 5404285 Idle
(Unclassifie
d)
7.64 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2020 5419926
Idle
(Unclassifie
d)
16.92 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2020 5420452
Idle
(Unclassifie
d)
5.22 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 1908
California Water Service Company 54 Woodard & Curran, Inc.
Clements Ranch Water Supply Assessment April 3, 2026
APPENDIX E: CLEMENTS RANCH TENTATIVE SUBDIVISION MAP
1909
-""---l=;=~ iL~ 1
==:;:::::j...d J ['="· NIii,..,, ~ ""· TYf'JCM. PRtVATE STREET ? \_=.::..~.
,· l J "
Y\;;~"· •• ~l ~-~ rTl = " - • .::... '
~ ~ ""· TYPrcAl COUE :::SC- 5[lllOCJI"
=· ,·. ,o· wrrrll,""·
CDmlUCOFr,sc,,on ,. f ,MJRCIIIUM£
~~~~~
TEMPORARY 1VRNAROUND EASEMENT
{Sfff'IOTE)
OVERALL BOUNDARY
0 ,oo· ,w
SCALE: 1°• 10()'
fASEJICNll<f- Of"S(Mlj{J/f,/C<tl"QIN<
WISll'lctlMIIWl'R[ctllll[IIHPOC(OO'f
N0.20I0;5/JJQl: :l<:12 /WX510
CLEMENTS RANCH
TENTATIVE SUBDIVISION MAP
IJ.~. --,.;<'SIIJUO'
-...oomJ,
(W)IJf--"'50
UND8UMYOR
L.Etw.. DE8CAIPTION
~~;:~u-
~~~-
-
211/t WIDO«<!llllM;
IO!PIIOPUlfY"lh£-IIDAIIDOfllt"Qll.Ml'OFIIUIC.Sl'Al[OI'
-Daalll[l),SltUD!fS,
fMl1POIIIOO OFllt" rut-rOFl>CSOt/DIIIESl'°"""1110FSLC,O,J,~•f sa,m-.C2"USf,llaMl'llllaDIM'l£NCIW£JIDW,~ffllh£<>'11:Wl'IA1 f1€11CD'", OCSCll&:O AS tru.OOS:,
DtlPIIMG--llM1/>0lllOI I -SWIIIOl'lh£(Vll[IUOfOf~Cll(lK,AS S<,llOl[[J(DtfSlfJ)C:,,l'UJIIIJNtrJ;IIIC. - 121--.."20, '21- 470-<Ur - >21- - r,n
.:wr,-IIVKCUI.WJY.ll<aJ>"1
!>011:: M Y,JrJn =~,_,-'%~~--
ltlllfllWICAllllJOlh£r;nYOFIISII.M""'OPCII-,
l'£DCSIRM,l'IJIJX;,_1'U11'(151'.S.
fDIICDftlc.<IEllltl1'1Ct:m'Ol'-..,ro,,l!IAf.
SHEETl OF3
1910
TENTATIVE SUBDIVISION MAP BEING n,1~1:~.~ R~. °!"ai~ ~:~~t;.!~E:E~6i!fTION 3. ltlTHE COU NTYOFTl.Jl.J,.F!E, STATEOfCAI.JfORNIA.
MIIO'OO'OOT1',l15f'
SUNNYSIDEA\ll/,NV!?
-. --,---~-----·~ -- ' -. ;i
;, I ;,
---- - ~- , 1 ~ ~ ---~= -=~ _I
-- ~-- -
!!Jlv "~v §J,Sf" !!,.JI,,. /iA'! f sr " J.tsr !!Jissr .. e.~ v :
1"1'<1£-t
.. ' ' . w " ,.. ~ ,,, " "' ~ ,., lili
JJ,3,. 'J,.JJlv 1,JJ}v -
HIUOO"OC ""'' T~
, . i
ii
ii
:
' 'J _- •-- • 1 1 1
I I~ ~Sf"
If' I!;~ ;s,
- I~ .. ,-~ .. =.--+----
. ., l~ ,;/v
I I
I I
I I
I I
I I
I
. •--~filW _ _ ~----- : I __,----.;. '=--- ~ 1 1 I ~;;;~ ::::':::3!~::::::= -- -=----~···, .. ,... ! I - ---------~, \ I
'
--•ocw .. ~ I I I
~-•!••·-, !
I
I I ... ~ I I
' / I I I ,F '1 '
,,
/,
, ~-•m""":'l\ i'• I I I I -~-•-:.i_~ I
I _ _ J l----~~:':::.:t~ - - , --_~,[---:-- - ~ --~-- ~ -- ~ --- ---- -----T~-===~t~=-~~-==-=-=--C ,)..,- ·--- ____ ,
PIIOP(lS[IICITT'RICff10Ellllrl.lfllfCAIIOH
"""'"" """" ..:U/51l£""""5J
ro'
0 SCAL.E: 1·- so·
ro'
SHEET2 OF3
1911
rt7
TYPrCAl ~ SJ1HT
1------- --~-7--- - ------ - - -- 1 WldOF!i'.m:lHJ !UU©.oo..90 :J t'W lU, I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
; I
I ~ I
Ii __ , 9
It
: I
I I
I
I
I
TlcMPORAAY TURNAROUND EASEMENT
(SCCNOm
'"'
OVERALL BOUNDARY
0 - --- ---- --- ~- -"'"'~ - - ------ - ~ ~ O(ITl.OTS
oo:[IVl>H f"'l>'IOF SOlllhUIH~
l'JJIS/JNCOWWfrRCCCl'lllCDHooa.won
llll.11«.llll0Cl<l-111Pla:51Q
TENTATIVE SUBDIVISION MAP BEING'THEWESTHAI.FOFTI1ESOUTHWESTQUARTEROFSECTION J.
T.19S.,R,25E.,MOUNT DIA8LOBASEANOMERIDIAN,
IN THE COUNTY or nJl.,+.RE, STATE or CAI.IFORNL'I,
AECOAD OWNEA
UND UIYEYllR
J.IBJDUHl,1'15,<JCa.ows,c:<fJf>2
~)'-If- MO
LEGM. DESCflPTION
~
CIIYOF-.i<~R/1-
115/'!l•'l:MI. _,._,,,...,r,
~
artOF"""""'""'9l!<llll1'/'!l•-CMI. _,._,,,...,r,
1/EN.PIIOl'£ll1'/"IIE._1lDNICAOFfl£COUHl'l'OFl!lM£.S1•1£0F CtUll'IHl\l.lfSCIIIIE)AS~
IH'11'1lfffl'.»10Fl>E""1WldOFl>E--Q'.WIIIJIOF5Ecmo.l,~1R 50tll><,...,,CC15""1,IGl'T-.09'SE:--..:CO,,O,,C101>1£0f10<L ....... T IIEIEOF,1BQ1&11NlfW.<Jft DICCPIIIOCfl£RCFWNIIMll'OlfflOIILl'WC5'MHOFIIErnf1£11MCOFCNICIIDIOa/£R,.S -C>iW<OISITTlc:Mlllll\lUl1 .l, 191Q.
- J17-Q1Q. J1'---()1()--<J2J - 117- rJl<>-Qn
~-.....,,-co,:,,,rr,c:<an,;,
=:::.r:':::-== - -
OUT1.0T 8CHEDULE
fD/£00lC<llllltl11£WYOF-..l'OlllffllSlw:E;
~PIJIV(;~~
0Ffl£NICAIAOO.fll/VIECMNl'PH<SfJ",Alll£l!OC OFfWlll£ ~0FII£ ----otlll.08f.-.o>.
mi:-.-Hfll(twAS-..a:a51T/RGUJaa_,,,.-6MlMl£DfD
FIQ.lf.011:>0CL{,a:asl!)CWECfC-..CCSOCl~IICUDJIC--
Nliffl......,DIIUWIIIHGl!l- 21'H'S£2.
SHEETl 0F3
1912
I
' -I
LEGEND
PIIOP(lS[IICITT'RICff10Ellllrl.lfllfCAIIOH
"""'""""""..:U/51l£""""5J
ro'
TENTATIVE SUBDIVISION MAP BEING n,1~1:~.~ R~. °!"ai~ ~:~~t;.!~E:E~6i!fTION 3. ltlTHE COU NTYOFTl.Jl.J,.F!E, STATEOfCAI.JfORNIA.
0 ro'
SCAL.E: 1·- so·
SHEET2 OF3
1913
0 (Ot:) - - ---- ("') _ _ ___ _
~.
-~· ✓ _,:;;,- ,,,.,,.
- -/
,/-
;;::::.'.'.-::,: (,-
, ,
' . :
' ' 1.
''· '' ,. :i:.
:e:.
'' ! •
TE~YT~ND
-
I ,
: I I ,
'" I•
~ //' ' ' ' I
/;/ 11
:~--:_-_-_-_-_-_-_-_-_-~-- --=--:=--::-~(~ _::----i --· ' I j I ' i" ~/ I~ •
~ :1 '".-~---.-.------------"---------,i.,.~------""' ------------------------- + - ...,..,,,..,,,'t,. ........ - ------------ -~ j -~ SUNNYSIDEAVENUE ,;-
-- - -- - - -- - -- - - - -- - -- - - -7±= -- - - - - -- - - -- - -- - - ==> ,, I ,. I ,. I " I .. I ,, I ,. I ,, I " I " I 'P! I , I , I , I , I , I • I , I , I , :1 ; SE£SHEET2
TENTATIVE SUBDIVISION MAP
""0l'OSE!lcm'IO(l(Jl' - llfl"(l<0CW
El2SIN:lPClllUIPOIL('Sll[-,S)
SHEET3 OF3
1914
,I , n - tt~'--==-c;..== -= -(Of.) _ _ _ - - - --
1 I
/ I i
I It/
I
I I I
I I :! I I : ~
I 1 I I I i I I : I I i'
I I i
I I
I Q
I i :~----_-_-_-_-_-_-
/ I ,/>.f
i . ./ I ;~ , I
i
(Ot:) - - ---- (ti<) __ ___ _
----------------------- ,: -----------------~
( ,, \ " I .. I ,, I .. I " I ,. I ,, I ,, I " I '~! I , I • I ~.l: I , I • I , I , I , i1
TENTATIVE SUBDIVISION MAP
""0l'OSE!lcm'IO(l(Jl' - llfl"(l<0CW
El2SIN:l PClllUI POIL ('Sll[ -,S)
SHEET 3 OF3
1915
woodardcurran.com
Woodard
&Curran
1916
MEMO
Date: Project No.: 240208
To:
From:
May 31, 2026
Jarred Olsen- Principal Planner, City of Visalia,
Jaymie L. Brauer, Principal Planner
Subject: Response to Comments for the proposed Clements Ranch Tentative Tract Map 5606 As Lead Agency pursuant to the California Environmental Quality Act (CEQA) Guidelines (Public Resources Code (PRC) Section 15000 et seq.), the City of Visalia (City) prepared an Initial Study/Mitigated Negative Declaration (IS/MND) for the above referenced Project, pursuant to CEQA Guidelines Section 15070 et seq. The document was circulated for a 30-day public comment period, which began on May 8, 2026, and will end on Jume 7, 2026.
CEQA guidelines do not require nor provide guidance on responding to comments on an IS/ MND. However, this memo provides information relating to the comments received from the District, and the recommendations contained therein. These project clarifications fall within the scope of the original project analysis included in the IS/MND and do not result in an increase in impacts or any new impacts. No significant new environmental impacts would result from the recommended clarifications below. Therefore, it is our opinion that no substantial issues have been made that would require recirculation of the draft IS/MND pursuant to State CEQA Guidelines Section 15073.5 (Recirculation of a Negative Declaration Prior to Certification).
A letter from the California Department of Toxic Substances Control (DTSC) was received by the City on May 12, 2026. Their comments are summarized below, however, the bracketed comment letter is included as Attachment A of this memo. Comments are noted as #1-1 through #1-4 in the bracketed letter.
The following comments and responses are as follows:
1. California Department of Toxic Substances Control (DTSC) Comment #1-1:
The commenter correctly summarized the project description related to the proposed project.
Response:
Thank you for your comments. DTSC is a recognized reviewing agency, and their comments are appreciated. DTSC comments are noted for the record and are a part of the final IS/MND document.
Comment #1-2
The commenter states that the amounts and types of pesticides historically used on the site be identified. Also, soil samples should be taken to determine if petroleum hydrocarbons are found on the site.
5080 California Avenue, Suite 220 Bakersfield, California 93309-1697 Tel (661) 616-2600 Fax (661) 616-5970 www.quadknopf.com 1917
PAGE 2 OF 4
5080 California Avenue, Suite 400 Bakersfield, California 93309-1697 Tel (661) 616-2600 Fax (661) 616-5970 www.quadknopf.com
Response:
DTSC comments are noted for the record and are a part of the final IS/MND document.
As noted in the IS/MND Section (d)- Hazards and Hazardous Materials, the project is not located on a site that is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 (Cortese List) or the EnviroStor (DTSC) lists, and there are no hazardous or toxic sites in the vicinity (within one mile) of the project site.
Although not included in the IS-MND, according to the project applicants, a Phase I Environmental Site Assessment (ESA) was prepared for the project in which the potential for agricultural chemicals was evaluated (DR Horton 2026). According to the aerial imagery, portions the subject site have been utilized for agricultural purposes up until approximately 2018. While there is a potential that environmentally persistent pesticides/herbicides may have been applied to the crops grown on the subject site, no chemical mixing or chemical storage areas were observed during the site reconnaissance and no material evidence of the use of environmentally persistent pesticides/herbicides was obtained during the course of this assessment. Also, it is know that pesticides such as DDT have been banned from use since the 1970s.
Therefore, the potential for elevated concentrations of environmentally persistent pesticides/herbicides to currently exist in the near-surface soils of the subject site appears to be low.
There is no reasonably foreseeable condition or incident involving the project that could result in release of hazardous materials into the environment, other than any potential accidental releases of standard fuels, solvents, or chemicals encountered during typical construction of a residential subdivision.
In addition, as noted in Section III (a-c)- Air Quality, the site is relatively flat, and grading of the site will be minimal. The project is anticipated to generate PM 10 and PM 2.5 emissions that are well below the San Joaquin Valley Air Pollution Control District’s (SJVAPCD) adopted thresholds during construction.
Additionally, the project will comply with the following measures related to dust control following SJVAPCD Rules and Regulations apply to the proposed Project (and all projects):
• Rule 4102 – Nuisance – prohibits a facility from posing as a nuisance to surrounding receptors and can impose penalties for nuisance issues such as dust, smoke, excess emissions, etc. Compliance with this rule ensures that the area around the Project site will not be adversely impacted by such issues.
• Regulation VIII – Fugitive PM10 Prohibitions – a series of regulations to reduce and/or eliminate the generation of particulate matter (PM) that can adversely impact visibility as well as the health and safety of people on-site or in the vicinity of the Project. o Rule 8011 – General Requirements – this rule is to reduce ambient concentrations of fine particulate matter (PM10) by requiring actions to prevent, reduce, or mitigate anthropogenic (human-caused) fugitive dust emissions.
o Rule 8021 – Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities – restricts generation of airborne dust and visibility impacts from these activities.
Places limits on opacity and equipment operation under certain adverse weather conditions. o Rule 8041 – Carryout and Trackout – requires that equipment and vehicles leaving the construction site control the amount of dirt, soil, or mud that is tracked off-site and onto public roadways. This helps eliminate or minimize dust generation and opacity degradation. o Rule 8051 – Open Areas – limits fugitive dust from open areas, i.e., areas on a construction site that are not actively being constructed upon but may generate wind-blown dust. 1918
PAGE 3 OF 4
5080 California Avenue, Suite 400 Bakersfield, California 93309-1697 Tel (661) 616-2600 Fax (661) 616-5970 www.quadknopf.com
The project would comply with the above listed mitigation measures and applicable SJVAPDC regulations during construction, and exposure from potential pesticides in the soil during construction will be minimal.
Once the homes are constructed, there will be little to no areas of exposed dirt that might be dispersed into the air and create a health concern. Impacts remain less than significant, and no further action is warranted.
Based on the analysis presented in the IS/MND prepared for the project and the summary of findings outline herein, impacts remain less than significant, and the City feels that the MND has adequately acknowledged the potential for historic or future activities to result in the release of hazardous wastes/substances on the project site.
Comment #1-3:
The commenter recommended the proper sampling of soil fill materials should be conducted to ensure that the imported soil is free of contamination. DTSC recommends the imported materials be characterized according to DTSC’s 2001 Information Advisory Clean Imported Fill Material.
Response:
The project does not propose to import fill for use on the site. Additionally, the Phase I conducted concluded that there are no recognized environmental conditions (RECs), controlled RECs (CRECs) or historical RECs (HRECs) in conjunction with the project site (DR Horton 2026). It is highly unlikely that any undiscovered material would be uncovered during construction activities. As noted in the IS, structures will be constructed in accordance with all applicable International Building Code (IBC), California Building Code (CBC) standards, and City development standards, relating to soils. Adherence to all applicable regulations would avoid any potential impacts related to uncovered hazardous materials. Impacts remain less than significant, and no further action is necessary.
Comment #1-4:
The commenter recommended DTSC soil testing by DTSC staff should be conducted to ensure that the site soil is free of contamination.
Response:
See Responses #1-2 through #1-3. As previously noted, the Phase I ESA concluded that there are no recognized environmental conditions and the potential for elevated concentrations of environmentally persistent pesticides/herbicides to currently exist in the near-surface soils of the subject site appears to be low. Adherence to all applicable regulations would avoid any potential impacts related to uncovered hazardous materials. Impacts remain less than significant, and no further action is necessary.
References
DR Horton. 2026. "Personal Communication." May 13.
1919
PAGE 4 OF 4
5080 California Avenue, Suite 400 Bakersfield, California 93309-1697 Tel (661) 616-2600 Fax (661) 616-5970 www.quadknopf.com
Attachment AComment Letter Received
1920
dtsc.ca.gov
SENT VIA ELECTRONIC MAIL
May 12, 2026
Jarred Olsen
Principal Planner
City of Visalia
315 East Acequia Avenue
Visalia, CA 93291
[email protected]
RE: MITIGATED NEGATIVE DECLARATION FOR CLEMENTS RANCH TENTATIVE TRACT MAP NO. 5606 DATED MAY 7, 2026, STATE CLEARINGHOUSE NUMBER 2026050300
Dear Jarred Olsen,
The Department of Toxic Substances Control (DTSC) reviewed the Mitigated Negative Declaration (MND)For Clements Ranch Tentative Tract Map No. 5606 (Project). The Project site consists of approximately 370 multifamily highdensity units, 153 singlefamily mediumdensity units in a gated community with a Homeowners Association (HOA), and 139 singlefamily lowdensity units in a nongated community, for a total of approximately 662 units. DTSC recommends and requests consideration of the following comments:
1. When agricultural crops and/or land uses are proposed or rezoned for residential use, several contaminants of concern (COCs) can be present.
The Lead Agency shall identify the amounts of Pesticides and Organochlorine Pesticides (OCPs) historically used on the property. If present, OCPs requiring further analysis are dichlorodiphenyltrichloroethane, toxaphene, and dieldrin. Additionally, any level of arsenic 1921
Jarred Olsen