Cities Index.
cc/bsd AR 05/13 raceway basin & buena creek pump station project award of contract

Vista City Council
May 13, 2025

Document
cc/bsd AR 05/13 raceway basin & buena creek pump station project award of contract
Meeting
May 13, 2025
Body
Vista City Council
Pages
26
Original file
1.8 MB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

9936A.10 | Letter report_RPS grinder.docx
carollo.com
Monster, pictured in Figures 1 and 2. JWC has
developed Wipes Ready technology which supposedly
improves the ability to cut long-fiber materials, such as handy-wipes and towels, into smaller pieces to prevent
pump ragging. Both units have dual rotating cutter
stacks, constructed of heat-treated alloy steel for
corrosion protection, that pull solids into the stack for shredding. The cutters have 17 teeth each and are
serrated for improved wipes shredding. Each operates
with a 5 horsepower immiscible motor, able to withstand temporary overflow conditions in the event of grinder
failure. A stainless steel overflow bar rack provides a backup for debris removal in the event of a grinder
failure. The Channel Monster has an additional rotating perforated screening drum that directs debris into the
cutter stack, while maintaining the flow. The Buena
Creek Pump Station currently has two Channel monsters
installed and has operated well with this configuration.

The Franklin Miller (FM) Taskmaster Grinder Model TM8532, Figure 3, is an alternative that is similar to the JWC Muffin Monster. The main difference between the Franklin Miller and JWC models is the configuration of the cutter stacks. While JWC cutters are machined as individual disks mounted with spacers in between, Franklin Miller machines a cutter cartridge from a solid block of alloy steel; a typical cutter cartridge replaces 6 cutters and 6 spacers. Each cutter has 11 teeth. The FM Taskmaster operates with a submersible 3 horsepower motor, capable of running fully submerged or in air.

All three units are suitable for RWPS, but there are several factors to be considered. The inclusion of the perforated drum on the Channel Monster allows for better flow through the unit when it is not operational, but additional moving parts increase the potential for maintenance and repair issues. The Channel Monster has the largest footprint of the three units, taking up a larger area in the channel than the other units, which could impact hydraulics and increase the depth of flow in the upstream pipes.

Under normal conditions, most of the cutter stack will be submerged, with the majority of cutter teeth engaged. It is also twice as heavy as the other models, which would make removal/maintenance more difficult. JWC recommends inspecting the cutter stack on all models twice yearly for signs of wear that may require tightening. Franklin Miller claims that the cutter stack in the Taskmaster never needs retightening, as the solid block cutter cartridge replaces multiple moving parts which are more likely to loosen. Both JWC units have more teeth per cutter than the FM unit, providing more points of contact for pulling debris into the cutters. The Muffin Monster and FM Taskmaster both have a smaller footprint than the Channel Monster, but the cutter stack is taller and will remain partially above the flow, so a lower percentage of cutter teeth will come into contact with the flow. Specifications for all three units are summarized in Table 1.

Figure 2. JWC
Muffin Monster
Figure 2. JWC
Channel Monster
Figure 3.

Franklin Miller
Taskmaster
05/13/2025 C9 826 of 1078
Mr. Alfred Pedroza
City of Vista
August 31, 2015

Page 3 ends

9936A.10 | Letter report_RPS grinder.docx
carollo.com
Table 1. Grinder Specifications

CONCLUSION AND RECOMMENDATION
While the Franklin Miller Taskmaster and both JWC Environmental sewage grinders are able to meet the needs of RWPS, the JWC Environmental 30005 Muffin Monster is the most cost efficient alternative. Consideration must also be given to the preference of the pump station operations staff. Concerns about JWC Environmental's customer service and slow response time were discussed, and a request was made to investigate the options available from Franklin Miller. The FM grinder that suits the application at RWPS is also the most costly alternative. At this time, no decision has been made about sole sourcing.

Sincerely,
CAROLLO ENGINEERS, INC.

Risa Guysi
RG:rg
JWC 30005 Muffin Monster 2.1 580 5 0.57 36 17 36000
JWC CMD 1810 Channel Monster 2.4 1095 5 3.2 23 17 46000 FM Taskmaster TM 8532 2.4 625 3 0.57 36 11 46441
*Equipment cost does not include installation
Grinder Model Equipment
Cost*, $
Maximum
Flow, MGD Weight, lbs Horsepower Footprint,
ft2
Cutter Stack
Height, in
Teeth per
Cutter
05/13/2025 C9 827 of 1078
05/13/2025 C9 828 of 1078
PUMP STATION REHABILITATION STUDY | CITY OF VISTA
FINAL | AUGUST ͮͬͭͲ
Appendix K
RACEWAY PUMP STATION: DERAGGER II

TECHNICAL MEMO
05/13/2025 C9 829 of 1078
05/13/2025 C9 830 of 1078
Project No 9936A.10| Deragger Memo.docx 5075 Shoreham Place, Suite 120, San Diego, California 92122 P. 858.505.1020 F. 858.505.1015
carollo.com
August 31, 2015
Mr. Elmer Alex
City of Vista
200 Civic Center Drive
Vista, CA 92084
Subject: Raceway Pump Station - Deragger Update
Dear Mr. Alex:

The purpose of this report is to share the information collected on Clearwater Controls Deragger II, for possible inclusion in the final design for the rehabilitation of the Raceway Pump Station (RWPS).

BACKGROUND
The City of Vista (City) owns four wastewater pump stations - the Buena Creek Pump Station (BCPS), the Buena Vista Pump Station (BVPS), and the Raceway Pump Station (RWPS) and the Aqua Hedonda Pump Station. All three pump stations convey raw wastewater to the Encina Water Pollution Control Facility. The accumulation of rags and debris on pump impellers is a common problem in wastewater collection systems. As rags build up it can cause significant damage to the pumps, pump motors and variable frequency drives (VFD). One common means to prevent the rag build up is to install grinders upstream of lift stations. Grinders break down rags and large debris into smaller fragments that cannot get caught up in the pump impeller.

Grinders are installed at all of the City's lift stations. At the RWPS, the grinder has recently been out of service, allowing rags into the wet well. The rag build up on the pump impellers became significant enough that it resulted in a pump failure. Ultimately, the pump VFD was so badly damaged that replacement was required.

Another means to prevent ragging has recently been introduced to the wastewater market in the United States. The Clearwater Controls Deragger utilizes pump controls to reverse the pump impeller when ragging is detected. The City recently came across the device and there is a desire to investigate the potential to use at the City's pump stations.

PRODUCT OVERVIEW
The Deragger II is an Anti-Ragging Device (ARD) that fits into the pump control panel or VFD panel and continuously monitors the pump. It prevents blockages by initiating cleaning cycles at every pump start up, at specified time intervals, and when analog input setpoints are breached.

The cleaning cycle is a series of forward, reverse, and stopping actions that clear the impeller of rags and fat deposits, and is customized to meet the needs of the site. Typical parameter setpoints used to trigger a cleaning cycle are high amperage, indicating that the motor is working harder than necessary, and low flow or increased wet well level, which both indicate problems with pump operation likely caused by ragging. The ARD sends a signal to the PLC when it begins a clean cycle; if there is a persistent blockage, the cleaning cycle will repeat, and if it isn't cleared and keeps repeating, this indicates that the pump needs to be dealt with 05/13/2025 C9 831 of 1078
Mr. Elmer Alex
City of Vista
August 31, 2015

Page 2 ends

Project No 9936A.10| Deragger Memo.docx
carollo.com
manually. Additional features that can be added include a wet well clean cycle, batch and volume pumping, and dry run protection.

US INSTALLS AND REFERENCES
The Deragger II is a fairly new technology from Clearwater Controls in Scotland that has been in the United States for less than two years. While the Deragger II has seen broader use in the United Kingdom since its introduction in 2011, many US municipalities are either not aware of it or are hesitant to use it until it has a more proven track record. Ponton Industries, Inc., the local US distributor for Clearwater Controls, provided a list of five US installs and references to gather information on how the Deragger has affected operations. Contacts at all five locations (three of them in Southern California, and two in Florida) were interviewed, with basic information summarized in Table 1.

Table 1. Deragger II United States Install List
Organization Contact
Number of
Pump
Stations
using ADR's
Number of
ADR's in
service
How long in
service?
LACSD Mark Pettit,
Senior Engineer 2 6 21 months
OCSD
Marcus Lambertz,
Maintenance
Supervisor
1 1 6 months
City of San
Clemente, CA
Ken Burtech,
Utilities Maintenance
Supervisor
1 3 1 year
City of Lake
Worth, FL
Dave Laperna,
Pump Station
Operating Foreman
1 3 6 months
Pasco County, FL Jeff Schlitt,
Project Manager 1 1 1 month

REFERENCE FEEDBACK
Los Angeles County Sanitation District (LACSD) was the first US location to use the Deragger II, installing it at the Western Avenue Pumping Station on a trial basis. The site had a prevalent ragging issue and one of the senior engineers had been investigating the possibility of reversing pumps to clear rags from the impellers when he came upon this device. Deragger II's were then installed on two 50 hp pumps, which previously required manual deragging about four times a month. During the trial, the Deragger II averaged one clean cycle per day, and no manual deragging was necessary. The trial results lead LACSD to integrate the Deragger II into the Long Beach Main facility, which handles about 35 MGD. The sites 200 hp pumps were having 05/13/2025 C9 832 of 1078
Mr. Elmer Alex
City of Vista
August 31, 2015

Page 3 ends

Project No 9936A.10| Deragger Memo.docx
carollo.com
problems with ragging, requiring operators to perform manual cleaning and rag removal an average of 18 times per month, an unsanitary task that reduces productivity and presents a safety hazard. Since inclusion of the Deragger II, Mr. Pettit noted only one instance of manual deragging. When asked about any issues regarding installation, startup, and operation, the only problem mentioned was a small issue with the Modbus that hasn't affected performance.

Clearwater Controls has been very responsive to this and all aspects of the use of their product.

The remaining references cited similar results with the Deragger II.

CONCLUSION
Carollo has concerns about including this product in the design for RWPS. The install list provided by the local distributor list is very short, with most sites only having the Deragger II in service for 6 months or less. While two of the sites use the deragger with a VFD, none were found that are using this product with Allen-Bradley VFD's, as are in use at RWPS. The distributor mentioned that the Deragger II was ideal for locations without a grinder, and that it was preferable to have the debris travel through the facility intact where it could be removed from the process stream easily rather than having the shredded pieces clog up digesters downstream. Since RWPS typically operates with a grinder online, the pumps shouldn't experience the ragging issues that have occurred during the time that the Moyno grinder has been removed for maintenance. Furthermore, there are serious reservations about using this product with an existing pump from the standpoint that rotating the pump impeller backwards may be outside the capabilities of the pump, and could result in damage to the pump. A major drawback is that integrating this product into the design of the new VFD's would require the addition of two contactors; one for forward rotation and one for reverse. For this horsepower size, the contactors are of significant size, and given the very limited footprint that is available, it is not likely that the device can be integrated in the VFD panels without significantly rearranging the electrical gear layout.

RECOMMENDATION
Given the lack of long-term evaluation of this product, the issues regarding integration into the VFD's, and that ragging at RWPS is primarily resolved with the use of grinders, it is not recommended to install the device at the City's pump stations..

Sincerely,
CAROLLO ENGINEERS, INC.

Risa Guysi
RG:rg
05/13/2025 C9 833 of 1078
05/13/2025 C9 834 of 1078
PUMP STATION REHABILITATION STUDY | CITY OF VISTA
FINAL | AUGUST ͮͬͭͲ
Appendix L
BUENA CREEK PUMP STATION: REDUNDANT

FORCEMAIN NON-COST EVALUATION
05/13/2025 C9 835 of 1078
05/13/2025 C9 836 of 1078
Project: Pump Station Rehabilitation and PLC/VFD Replacement Client: City of Vista
Table A: Alternative Forcemain Non-Cost Evaluation Matrix Table Advantages: Advantages: Advantages: Advantages: Advantages:
• Portion of alignment is in a low volume road • Portion of alignment is in a low volume road • None •None Disadvantages: Disadvantages: Disadvantages: Disadvantages:
• Traffic control required • Traffic control required • Traffic control required • Traffic control required Disadvantages:
• Alignment is in high volume Road • Alignment is in high volume Road • Alignment is in high volume Road • Alignment is in high v olume Road • Traffic control required (least of all alternatives) • Alignment is in high volume Road
Advantages: Advantages: Advantages: Advantages: Advantages:
• Pipeline follows existing road • Shortest reach of all alternatives • Pipeline follows existing road • Pipeline follows existing road • Pipeline already exists Disadvantages: • Pipeline follows existing road Disadvantages: Disadvantages: Disadvantages:
• Possible utility conflict at intersections Disadvantages: • Possible utility conflict at intersections • Longest reach of all alternatives • Length required to reach gravity main • Possible utility conflict at intersections • Length required to reach gravity main • Pos sible utility conflict at intersections • Alignment is within an unimproved road and may conflict with existing pipelines
• May require additional pipeline to connect Lift Station near Melrose and Aspen
Advantages: Advantages: Advantages: Advantages: Advantages:
• None • None • None • None • No major permitting expected Disadvantages: Disadvantages: Disadvantages: Disadvantages: Disadvantages:
• Encroachment permits • Encroachment permits • Encroachment permits • Encroachment permits • Near environmentally sensitive area •Creek Crossing along Melrose
Advantages: Advantages: Advantages: Advantages: Advantages:
• None • Majority of alignment in ROW • Majority of alignment in ROW • Majority of alignment in ROW • No new Easements required Disadvantages: Disadvantages: Disadvantages: Disadvantages: Disadvantages:
• Orion Street is under private ownership •May require easement along unimproved surface • Short easement may be required • Short easement may be required • None Advantages: Advantages: Advantages: Advantages: Advantages:
• None • None • None • None • Pipeline is already installed Disadvantages: Disadvantages: Disadvantages: Disadvantages: Disadvantages:
• None
Advantages: Advantages: Advantages: Advantages: Advantages:
•None • Smallest diameter pipe of all options (24") •None •None • Smallest diameter pipe of all options (24") Disadvantages: • Shortest alignment Disadvantages: Disadvantages: Disadvantages:
•Larger pipe diameter required (30") Disadvantages: • Larger pipe diameter required (30") • Larger pipe diameter required (30") • None •None
Final Score 100% 3.0 3.35 2.35 1.8 3.9
Weighted Score
Weighted Score
Unweighted Score
Weighted Score
Unweighted Score
Weighted Score
Unweighted Score
Alternative 5 (Excess Effluent Alignment)Criteria Alternative 1 Alternative 2 Alternative 3 Alternative 4 Criteria Weight
Unweighted Score
Weighted Score
Unweighted Score
1Community Disruption 25% 30 . 7 5 20 . 5 10 . 2 5 10 . 2 5 4 • Portion of alignment in greenspace; Low disruption to public 20 . 5Construction Impact 25% 30 . 7 5 30 . 7 5 • Condition of pipeline is unknown and may require replacement or rehabilitation
4 20 . 5 10 . 2 5

0.2 40 . 4
Permitting/ Environmental 40 . 4 40 . 4
Easement/Acquisition ROW
10%
10% 2 0.5

0.4 30 . 3 40 . 4

0.5Utilities 10% 30 . 3 30 . 3 20 . 2 20 . 2 5
• Numerous Utilities at the intersection of Melrose and Faraday.• Numerous Utilities at the intersection of Melrose and Faraday. • Numerous Utilities at the intersection of Melrose and Faraday. • Numerous Utilities at the intersection of Melrose and Faraday . 1Hydraulics 20% 30 . 6 51 30 . 6 20 . 4 5
40 . 4 40 . 4 5
05/13/2025 C9 837 of 1078
05/13/2025 C9 838 of 1078
A
FY2023 REMOTE COMPREHENSIVE ASSET

MANAGEMENT PLAN
(R-CAMP)
22 July 2022
7700 Irvine Center Dr., Suit 200,
Irvine, CA 92618
(949) 557-8549
AHLS
CWRF

BCPS RBPS
BVPS
Prepared for
Encina Wastewater Authority
6200 Avenida Encinas
Carlsbad, California 92011
05/13/2025 C9 839 of 1078

I

Table of Contents
EXECUTIVE SUMMARY.............................................................................................................. ...............................1 ES.1. INTRODUCTION .............................................................................................................. ...........................1 ES.2. R-CAMP PROCESS ............................................................................................................. .........................2 ES.3. CONDITION ASSESSMENT SUMMARY ................................................................................................ .....4 ES.4. STUDIES AND PROFESSIONAL SERVICES............................................................................................ ...4 ES.5. IDENTIFICATION OF R-CAMP PROJECTS............................................................................................ ...5 ES.6. PROJECT EVALUATION......................................................................................................... ....................7 ES.7. PROJECT PRIORITIZATION..................................................................................................... ..................8 ES.8. RECOMMENDED PROJECT IMPLEMENT ATION SCHEDULE AND COST SUMMARY ......................14

1. INTRODUCTION ................................................................................................................. ............................ 1-1

1.1 BACKGROUND .................................................................................................................. ..................... 1-1

1.1.1. Buena Creek Pump Station................................................................................................. ............. 1-1

1.1.2. Raceway Basin Pump Station............................................................................................... ........... 1-2

1.1.3. Buena Vista Pump Station................................................................................................. .............. 1-2

1.1.4. Agua Hedionda Lift Station............................................................................................... .............. 1-3

1.1.5. Carlsbad Water Recycling Facility ........................................................................................ ......... 1-3

1.2 PURPOSE..................................................................................................................... ............................ 1-4

2. REMOTE COMPREHENSIVE ASEET MANAGEMENT PLAN PROCESS .............................................. 2-1

2.1. PROCESS .................................................................................................................... ............................. 2-1

2.1.1. Project Identification and Grouping ...................................................................................... ......... 2-3

2.1.2. Computerized Maintenance Management System........................................................................... 2-3

2.1.3. Condition Assessments .................................................................................................... ................ 2-3

2.1.4. Previous Remote Comprehenisive Asset Management Plan ........................................................... 2-4

2.1.5. Other Project Sources .................................................................................................... ................. 2-5

2.1.6. Project Reference List ................................................................................................... .................. 2-5

2.1.7. Project Grouping......................................................................................................... .................... 2-5

2.1.8. Project Numbering ........................................................................................................ .................. 2-6

2.1.9. Project Evaluation....................................................................................................... .................... 2-8

2.1.10. Project Cost Estimating ................................................................................................. ................. 2-8

2.1.11. Project Prio ritization .................................................................................................. .................. 2-10

2.1.12. Implementation Schedule ................................................................................................. ............. 2-11

2.1.13. Frequency of R-CAMP ..................................................................................................... ............. 2-11

3. CONDITION ASSES SMENT SUMMARY................................................................................................. ..... 3-1

3.1. FIELD CONDITION ASSESSMENT................................................................................................... ...... 3-1

3.2. FOCUSED CONDITION ASSESSMENT................................................................................................. .3 - 4

4. STUDIES AND OTHER PROF ESSIONAL SERVICES................................................................................ 4-1

4.1. STUDIES .................................................................................................................... .............................. 4-1

4.2. BUNEA CREEK PUMP STATION STUDIES ........................................................................................... 4-1

4.2.1. EWA Studies .............................................................................................................. ...................... 4-1

4.2.2. Owners Studies........................................................................................................... ..................... 4-1

4.3. RACEWAY BASIN PUMP STATION STUDIES ........................................................................................ 4-1

4.3.1. EWA Studies .............................................................................................................. ...................... 4-1

4.3.2. Owners Studies........................................................................................................... ..................... 4-2

4.4. BUNEA VISTA PUMP STATION STUDIES ............................................................................................. 4- 3

4.4.1. EWA Studies .............................................................................................................. ...................... 4-3

4.4.2. Owners Studies........................................................................................................... ..................... 4-3

4.5. AGUA HEDIONDA LIFT STATION STUDIES......................................................................................... 4-4 05/13/2025 C9 840 of 1078

II

4.5.1. EWA Studies .............................................................................................................. ...................... 4-4

4.5.2. Owners Studies........................................................................................................... ..................... 4-4

4.6. CARLSBAD WATER RECYCLING FACILITY STUDIES ......................................................................... 4-4

4.6.1. EWA Studies .............................................................................................................. ...................... 4-4

4.6.2. Owners Studies........................................................................................................... ..................... 4-4

5. IDENTIFICATION OF PROJECTS ................................................................................................... ............ 5-1

5.1. BUENA CREEK PUMP STATION PROJECTS ........................................................................................ 5-8

5.1.1. EWA Projects ............................................................................................................. ..................... 5-8

5.1.2. Owners Projects .......................................................................................................... .................. 5-14

5.2. RACEWAY BASIN PUMP STATION PROJECTS................................................................................... 5-17

5.2.1. EWA Projects ............................................................................................................. ................... 5-17

5.2.2. Owners Projects .......................................................................................................... .................. 5-23

5.3. BUENA VISTA PUMP STATION PROJECTS ........................................................................................ 5-25

5.3.1. EWA Projects ............................................................................................................. ................... 5-25

5.3.2. Owners Projects .......................................................................................................... .................. 5-32

5.4. AGUA HEDIONDA LIFT STATION PROJECTS.................................................................................... 5-34

5.4.1. EWA Projects ............................................................................................................. ................... 5-34

5.4.2. Owners Projects .......................................................................................................... .................. 5-41

5.5. CARLSBAD WATER RECYCLING FACILITY PROJECTS.................................................................... 5-42

5.5.1. EWA Projects ............................................................................................................. ................... 5-42

5.5.2. Owners Projects .......................................................................................................... .................. 5-48

6. PROJECT EVALUATION AND PRIORITIZATION..................................................................................... 6-1

6.1. EVALUATION CRITERIA ......................................................................................................... ............... 6-1

6.2. IMPACT FACTORS .............................................................................................................. .................... 6-2

6.3. EVALUATION SCORING RESULTS................................................................................................... ..... 6-2

6.4. PROJECT PRIORITIZATION...................................................................................................... ........... 6-14

7. RECOMMENDED PROJECT IMPLEMENTATION SCHEDULE AND COST SUMMARY .................... 7-1

7.1. IMPLEMENTATION SCHED ULE AND COST SUMMARY..................................................................... 7-1

7.2. WHAT’SNEXT........................................................................................................................... ............... 7-1 APPENDIX A: HISTORICAL PROJECT LIST ............................................................................................ ........... A1 APPENDIX B: BASIS OF ESTIMATE .................................................................................................. .................. B1 APPENDIX C: PROJECT COST TABLES ................................................................................................ .............. C1 APPENDIX D: SPARE PARTS LIST ................................................................................................... ....................D1 APPENDIX E: PROJECTS MASTER LIST............................................................................................... .............. E1 APPENDIX F: ASSET REGISTER ..................................................................................................... ..................... F1 05/13/2025 C9 841 of 1078

III

List of Tables
TABLE ES-1: PROJECT RESPONSIBILITY DESIGNATION SUMMARY..................................................................................ES-5 TABLE ES-2: EVALUATION CRITERIA..............................................................................................................................E S-7 TABLE ES-3: OVERVIEW OF BCPS PROJECTS RECOMMENDED FOR IMPLEMENTATION FOR FY2023 ‐ FY2028 ..............ES-9 TABLE ES-4: OVERVIEW OF RBPS PROJECTS RECOMMENDED FOR IMPLEMENTATION FOR FY2023 ‐ FY2028 ............ES-10 TABLE ES-5: OVERVIEW OF BVPS PROJECTS RECOMMENDED FOR IMPLEMENTATION FOR FY2023 ‐ FY2028............ES-11 TABLE ES-6: OVERVIEW OF AHLS PROJECTS RECOMMENDED FOR IMPLEMENTATION FOR FY2023 ‐ FY2028 ...........ES-12 TABLE ES-7: OVERVIEW OF CWRF PROJECTS RECOMMENDED FOR IMPLEMENTATION FOR FY2023 ‐ FY2028 ..........ES-13 TABLE ES-8: OVERVIEW OF RECOMMENDED IMPLEMENTATION SCHEDULE FOR PRIORITIZED PROJECTS (FY2023 - FY2028) ........................................................................................................................ ......................................ES-15 TABLE 1-1: BUENA CREEK PUMP STATION PROFILE ......................................................................................................... 1-2 TABLE 1-2: RACEWAY BASIN PUMP STATION PROFILE ..................................................................................................... 1-2 TABLE 1-3: BUENA VISTA PUMP STATION PROFILE .......................................................................................................... 1-3 TABLE 1-4: AGUA HEDIONDA LIFT STATION PROFILE....................................................................................................... 1-3 TABLE 2-1: PROJECT NUMBERING SYSTEM ....................................................................................................................... 2-7 TABLE 2-2: COST ESTIMATE CLASSIFICATION MATRIX FOR PROCESS INDUSTRIES........................................................... 2-9 TABLE 2-3: CONSTRUCTION COST BASELINE PERCENTAGES .......................................................................................... 2-10 TABLE 2-4: PROJECT PHASE COSTS BASELINE RATES..................................................................................................... 2-10 TABLE 3-1: FAILURE MODES............................................................................................................................... .............. 3-1 TABLE 5-1: BCPS PROJECT RESPONSIBILITY DESIGNATION ............................................................................................. 5-3 TABLE 5-2: RBPS PROJECT RESPONSIBILITY DESIGNATION ............................................................................................. 5-4 TABLE 5-3: BVPS PROJECT RESPONSIBILITY DESIGNATION ............................................................................................. 5-5 TABLE 5-4: AHLS PROJECT RESPONSIBILITY DESIGNATION............................................................................................. 5-6 TABLE 5-5: CWRF PROJECT RESPONSIBILITY DESIGNATION............................................................................................ 5-7 TABLE 6-1: EVALUATION CRITERIA ............................................................................................................................... ... 6-2 TABLE 6-2: PROJECT IMPACT FACTOR PARAMETERS ........................................................................................................ 6-3 TABLE 6-3: BCPS PROJECT SCORING – DESCENDING SCORE............................................................................................ 6-4 TABLE 6-4: BCPS PROJECT SCORING – ASCENDING PROJECT NUMBER............................................................................ 6-5 TABLE 6-5: RBPS PROJECT SCORING – DESCENDING SCORE............................................................................................ 6-6 TABLE 6-6: RBPS PROJECT SCORING – ASCENDING PROJECT NUMBER............................................................................ 6-7 TABLE 6-7: BVPS PROJECT SCORING – DESCENDING SCORE............................................................................................ 6-8 TABLE 6-8: BVPS PROJECT SCORING – ASCENDING PROJECT NUMBER ........................................................................... 6-9 TABLE 6-9: AHLS PROJECT SCORING – DESCENDING SCORE ......................................................................................... 6-10 TABLE 6-10: AHLS PROJECT SCORING – ASCENDING PROJECT NUMBER ....................................................................... 6-11 TABLE 6-11: CWRF PROJECT SCORING – DESCENDING SCORE ...................................................................................... 6-12 TABLE 6-12: CWRF PROJECT SCORING – ASCENDING PROJECT NUMBER ...................................................................... 6-13 TABLE 7-1: PROJECTED COST BY FISCAL YEAR FOR PRIORITIZED BCPS PROJECTS.......................................................... 7-3 TABLE 7-2: PROJECTED COST BY FISCAL YEAR FOR PRIORITIZED RBPS PROJECTS.......................................................... 7-5 TABLE 7-3: RECOMMENDED IMPLEMENTATION SCHEDULE FOR PRIORITIZED BVPS PROJECTS........................................ 7-7 TABLE 7-4: RECOMMENDED IMPLEMENTATION SCHEDULE FOR PRIORITIZED AHLS PROJECTS ....................................... 7-9 TABLE 7-5: RECOMMENDED IMPLEMENTATION SCHEDULE FOR PRIORITIZED CWRF PROJECTS .................................... 7-11 TABLE F-1: BCPS ASSET REGISTER............................................................................................................................... .....F1 TABLE F-2: RBPS ASSET REGISTER............................................................................................................................... .....F4 TABLE F-3: BVPS ASSET REGISTER............................................................................................................................... .....F6 TABLE F-4: AHLS ASSET REGISTER ............................................................................................................................... ..F10 TABLE F-5: CWRF ASSET REGISTER ............................................................................................................................... .F14 05/13/2025 C9 842 of 1078

IV

List of Figures
FIGURE ES-1: PROJECT DEVELOPMENT PROCESS............................................................................................................ES-3 FIGURE 2-1: PROJECT DEVELOPMENT PROCESS ................................................................................................................ 2-2 FIGURE 2-2: MOBILE COLLECTION TOOLS AND CONDITION SCORING GUIDE ................................................................... 2-6 FIGURE 2-3: MOBILE COLLECTION TOOLS AND CONDITION SCORING GUIDE ................................................................... 2-7 FIGURE 3-1: MOBILE COLLECTION TOOLS AND CONDITION SCORING GUIDE ................................................................... 3-3 FIGURE 3-2: FIELD CONDITION ASSESSMENT RESULTS FOR BCPS, RBPS, AND BVPS..................................................... 3-4 FIGURE 3-3: FIELD CONDITION ASSESSMENT RESULTS FOR CWRF.................................................................................. 3-5 FIGURE 4-1: FIELD CONDITION ASSESSMENT RESULTS FOR CWRF.................................................................................. 4-2 FIGURE 6-1: BCPS PROJECT COST VS ORGANIZATION IMPACT....................................................................................... 6-15 FIGURE 6-2: RBPS PROJECT COST VS ORGANIZATION IMPACT....................................................................................... 6-16 FIGURE 6-3: BVPS PROJECT COST VS ORGANIZATION IMPACT....................................................................................... 6-17 FIGURE 6-4: AHLS PROJECT COST VS ORGANIZATION IMPACT ...................................................................................... 6-18 FIGURE 6-5: CWRF PROJECT COST VS ORGANIZATION IMPACT ..................................................................................... 6-19 FIGURE 7-1: RECOMMENDED IMPLEMENTATION SCHEDULE FOR PRIORITIZED BCPS PROJECTS....................................... 7-2 FIGURE 7-2: RECOMMENDED IMPLEMENTATION SCHEDULE FOR PRIORITIZED RBPS PROJECTS....................................... 7-4 FIGURE 7-3: RECOMMENDED IMPLEMENTATION SCHEDULE FOR PRIORITIZED BVPS PROJECTS ...................................... 7-6 FIGURE 7-4: RECOMMENDED IMPLEMENTATION SCHEDULE FOR PRIORITIZED AHLS PROJECTS ...................................... 7-8 FIGURE 7-5: RECOMMENDED IMPLEMENTATION SCHEDULE FOR PRIORITIZED CWRF PROJECTS ................................... 7-10 05/13/2025 C9 843 of 1078

V

List of Abbreviations and Acronyms

AACE ASSOCIATION FOR THE ADVANCEMENT OF COST ENGINEERING

AHLS AGUA HEDIONDA LIFT STATION

BCPS BUENA CREEK PUMP STATION

BOE BASIS OF ESTIMATE

BVPS BUENA VISTA PUMP STATION

CAMP COMPREHENSIVE ASSET MANAGEMENT PLAN

CCI CONSTRUCTION COST INDEX

CIP CAPITAL IMPROVEMENT PROJECTS

CMMS COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM

CMWD CARLSBAD MUNICIPAL WATER DISTRICT

CPS COMBINED PUMP STATION

CWRF CARLSBAD WATER RECYCLING FACILITY

E-CAMP ENCINA COMPREHENSIVE ASSET MANAGEMENT PLAN

EI&C ELECTRICAL,I NSTRUMENTATION AND CONTROL

ENR ENGINEERING NEWS RECORD

EWA ENCINA WASTEWATER AUTHORITY

EWPCF ENCINA WATER POLLUTION CONTROL FACILITY
Flow EQ Basin Flow Equalization Basin

FOG FATS,O ILS, AND GREASE

FY FISCAL YEAR

HVAC HEATING,V ENTILATION, AND AIR CONDITIONING

GMF GRANULAR MEDIA FILTERS

GPM GALLONS PER MINUTE

HMI HUMAN MACHINE INTERFACE

LCP LOCAL CONTROL PANEL

LED LIGHT EMITTING DIODE

MCC MOTOR CONTROL CENTER
05/13/2025 C9 844 of 1078

VI

MF MICROFILTRATION

MGD MILLION GALLONS PER DAY

MOU MEMORANDUM OF UNDERSTANDING

NETA INTERNATIONAL ELECTRICAL TESTING ASSOCIATION

O&M OPERATIONS AND MAINTENANCE

OSHA OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION

PVC POLYVINYL CHLORIDE

PLC PROGRAMMABLE LOGIC CONTROLLER

R&D RESEARCH AND DEVELOPMENT
R&R Rehabilitation and Replacement

RBPS RACEWAY BASIN PUMP STATION
R-CAMP Remote Comprehensive Asset Management Plan

RO REVERSE OSMOSIS

RWPS RECYCLED WATER PUMP STATION
SCADA Supervisory Control and Data Acquisition

SEEPS SECONDARY EFFLUENT EQUALIZATION PUMP STATION

RO INSPECTION REPORT CARLSBAD WATER RECYCLING FACILITY RO INSPECTION REPORT

UF ULTRAFILTRATION
05/13/2025 C9 845 of 1078
FY2023 R-CAMP Report

ES-1

EXECUTIVE SUMMARY
ES.1. INTRODUCTION
Encina Wastewater Authority (EWA) is a public joint powers authority located in Carlsbad, California, that provides wastewater treatment services to approximately 400,000 North San Diego County residents and industrial customers. EWA is comprised of six member agencies consisting of the City of Carlsbad, City of Vista, City of Encinitas, Buena Sanitation District, Leucadia Wastewater District, and Vallecitos Water District.

EWA was formed to operate and administer the Encina Water Pollution Control Facility (EWPCF), which is a secondary activated sludge treatment faci lity, to treat wastewater from the six Owners.

Wastewater is conveyed to the EWPCF by several pump stations throughout the service area. EWA operates and maintains four pump stations for the Cit ies of Carlsbad and Vista: Buena Creek Pump Station (BCPS), Raceway Basin Pump Station (RBPS), Buena Vista Pump Station (BVPS), and Agua Hedionda Lift Station (AHLS). Secondary effluent from the EWPCF is sent to the Carlsbad Water Recycling Facility (CWRF) for additional treatment to produce Title 22 recycled water for use by the Carlsbad Municipal Water Di strict (CMWD). The BCPS, RBPS, BVPS, AHLS, and CWRF are facilities that are owned by Carlsbad and/or Vista, and are operated and maintained by EWA, and are designated “remote facilities” as they are not located at the EWPCF.

EWA aims to maintain reliable and cost-effective resilient service by implementing proactive asset management approaches. In addition, EWA’sobjective is to invest appropriately to fully fund the cost of service, including capital improvements by estab lishing a well-grounded Asset Management Planning Services. The Remote Com prehensive Asset Management Plan ( R-CAMP) serves as a primary planning tool utilized to cost effectiv ely manage assets by planning, prioritizing, and scheduling condition assessments efforts and asset rehabilitation and replacement (R&R) for facilities operated by EWA, including the BCPS, RBPS, BVPS, AHLS, and CWRF.

The Memorandum of Understanding (MOU) between Owners and EWA as operators and maintainers requires EWA to develop the capital acquisiti on budget for each facility, as well as make recommendations for larger projects for Owners to incorporate into their CIPs. The R-CAMP identifies future expenditures for those cap ital acquisition budgets for mainten ance projects and conceptually identifies EWA staff recommendations for capita l improvement projects (CIP), which the respective facility Owner can then incorporate into their CI P for the facilities, including Owner’s review of capacity and upgrades. The R-CAMP then functions as a communication tool for the proposed improvements to the Owners, their re presentatives, and EWA staff. This R-CAMP update includes recommendations for capital acquisition budget and CIP recommendations for Owners to incorporate for fiscal year (FY) 2023 through FY2028. Capital ass ets related to projects for EWA’s EWPCF are identified in the Encina Comprehensive Asset Management Plan (E-CAMP) and are not evaluated in this R-CAMP.
05/13/2025 C9 846 of 1078
FY2023 R-CAMP Report

ES-2

While the R-CAMP is updated every two years and is i ndependent of the budgeting process, the information is leveraged during the budgeting process to provide direction for EWA staff and Owners.

EWA staff focus on the capital acquisiti on budgets, while Owners incorporate the CIP recommendations into their own CIP plans for the facilities for capacity and other upgrades.

ES.2. R-CAMP PROCESS
The R-CAMP process includes five task elements: proj ect identification and grouping; project evaluation; project cost estimating; project prior itization; and implementation schedule. EWA engaged the Owners through a series of workshops to review each key step in the process. A flow diagram of the EWA CIP development, including the R-CAMP process, is provided as Figure ES-1 with the R-CAMP task elements shown in blue-green.
05/13/2025 C9 847 of 1078
FY2023 R-CAMP Report

ES-3

Figure ES-1: Project Development Process
05/13/2025 C9 848 of 1078
FY2023 R-CAMP Report

ES-4

Projects that are included in the R-CAMP are identified through a number of means including EWA’s Computerized Maintenance Management System (CMMS), field condition assessments, site visit, the previous R-CAMP update, EWA or Owner staff, studies, report s, and other engineering services performed for EWA or the Owners. Projects may be grouped based on proximity, type of work, or priority to increase economic efficiency and reduce costs.

After the final list of R-CAMP projects is established, EWA and the Owners worked together to assign each project to the responsibility of EWA or the Owners. Generally, smaller maintenance projects are assigned to EWA and larger capita l projects are assigned to the Ow ners. Each project is evaluated using a set of six evaluation criteria: safety; regulat ory compliance; reliability; impacts to the public and EWA; energy efficiency; and organizational efficiency. These evaluation criteria are assigned a criticality factor that represents the level of importance of each across all the projects. Each project is scored across each of the evaluation criteria and th e sum of the six criteria scores is the evaluation score for each project.

Project cost estimates are developed for the full list of projects in the R-CAMP. All capital acquisition projects assigned to EWA in the R-CAMP are prioritized by considering the evaluation scoring results and estimated costs. The project prioritization process provides EWA with informed condition and cost data to select which projects to schedule for implementation over the next six fiscal years (through FY2028). Recommended priorities are also provided for the Owner projects for the Owner’s consideration. A recommended implementation sc hedule is prepared and provides direction for upcoming improvements to be included in the budgeti ng process. Projects that are not selected for implementation over the next six fiscal years are not scheduled in the R-CAMP but are included for future reference.

ES.3. CONDITION ASSESSMENT SUMMARY
Condition assessments are a key component of a strong asset management program. The benefit to a utility of a quantitative condition assessment is to capture both the estimated timing of asset failure and the impact such failures would have on broa der operations. The condition assessment program allows EWA and Owners to devel op more informed asset manage ment plans and capital budget prioritization processes. In addition to the condition assessments that are conducted regularly by EWA or are triggered by asset age or staff observations, Hazen performed a combination of field condition assessment and focused condition assessment. F or the BCPS, RBPS, and BVPS a comprehensive condition assessment was performed in May 2021 followed by a site visit in October 2021, while for CWRF the focused condition assessment approach was used. Given that AHLS has recently undergone construction and significant rehabilitation effort, a site visit was performed for this remote facility focused on performance and functionality issues, since most of the assets are in newer condition.

ES.4. STUDIES AND PROFESSIONAL SERVICES
Studies are completed to provide planning informa tion for maintaining remote facilities. Additional professional services include engineering services, research and development (R&D) services, permitting, and other services. A more detailed description of the id entified studies and professional services can be found in section 4 of this document.
05/13/2025 C9 849 of 1078
FY2023 R-CAMP Report

ES-5

ES.5. IDENTIFICATION OF R-CAMP PROJECTS
As described in the R-CAMP process, the first step is to identi fy projects to be considered for of implementation. Several projects a nd related studies were identified through this process and more detailed information regarding these projec ts, including background, description, justification/consequences, and project delivery method, can be found in section 5 of this document.

With EWA and Owner collaboration, proj ects are assigned to EWA or Owners based on the type of work required. Table ES-1 provides a breakdown of project assignment for projects in this R-CAMP.

Table ES-1: Project Responsibility Designation Summary
Project Number Project Name EWA Owners
Buena Creek Pump Station
P – 37002-001 Minor EI&C Rehabilitation X
P – 37002-002 Minor Mechanical Rehabilitation X
P – 37002-003 Minor Structural Rehabilitation X
P – 37002-004 SCADA Migration X
P – 37002-005 Site Safety Improvements X
P – 37002-006 Structural Improvements X
P – 37002-Recurring Grinder Rebuild X
P – 37002-Recurring Sewage Pump Rebuild X
P – 37002-Recurring Sewage Pump Motor Rebuild X
P – 37002-Recurring Coatings and Paintings X
P – 37002-Recurring Unplanned Minor Rehabilitation X
P – 37002-Recurring Integration Assistance X
P – 37002-Recurring VFD Repairs X
ES – 37002-Recurring R-CAMP Update X
P – 9.4.004 Major Equipment CIP X
P – 9.4.005 Scum and FOG Abatement X
P – 9.4.006 Site Security Improvements X
P – 9.4.007 Civil Improvement X
S/P – 9.4.008 Bypass Study X
P – 9.4.009 Mechanical Modifications
(formerly: Modify Discharge
Valve Installation)
X
P – 9.4-Recurring Landscaping X
Raceway Basin Pump Station
P – 39002-001 Minor EI&C Rehabilitation X
P – 39002-002 Minor Mechanical Rehabilitation X
P – 39002-003 Minor Structural Rehabilitation X
P – 39002-004 SCADA Migration X
P – 39002-005 Site Safety Improvements X
P – 39002-Recurring Grinder Rebuild X
P – 39002-Recurring Sewage Pump Rebuild X
P – 39002-Recurring Sewage Pump Motor Rebuild X
P – 39002-Recurring Coatings and Paintings X
P – 39002-Recurring Unplanned Minor Rehabilitation X
P – 39002-Recurring Integration Assistance X
05/13/2025 C9 850 of 1078
FY2023 R-CAMP Report

ES-6

Project Number Project Name EWA Owners
P – 39002-Recurring VFD Repairs X
ES – 39002-Recurring R-CAMP Update X
S/P – 9.1.006 Containment Basin Repair X
P – 9.1.008 Major Equipment CIP X
S/P – 9.1.009 Pump Station Resiliency Study X
P – 9.1.010 Scum and FOG Abatement X
P – 9.1.011 Site Security Improvements X
P – 9.1-Recurring Landscaping X
Buena Vista Pump Station
P – 32002-001 Minor EI&C Rehabilitation X
P – 32002-002 Minor Mechanical Rehabilitation X
P – 32002-003 Minor Structural Rehabilitation X
P – 32002-004 SCADA Migration X
P – 32002-005 Site Safety Improvements X
P – 32002-006 Structural Improvements X
P – 32002-Recurring Grinder Rebuild X
P – 32002-Recurring Sewage Pump Rebuild X
P – 32002-Recurring Sewage Pump Motor Rebuild X
P – 32002-Recurring Coatings and Paintings X
P – 32002-Recurring Unplanned Minor Rehabilitation X
P – 32002-Recurring Integration Assistance X
P – 32002-Recurring VFD Repairs X
ES – 32002-Recurring R-CAMP Update X
P – 9.3.008 Major Equipment CIP X
P – 9.3.009 Site Security Improvements X
S/P – 9.3.010 Facility-Level Alternative
Analysis (formerly
known as Relocation Study)
X
P – 9.3-Recurring Landscaping X
Agua Hedionda Lift Station
P – 31002-1 Minor EI&C Rehabilitation X
P – 31002-2 Minor Mechanical Rehabilitation X
P – 31002-3 Minor Structural Rehabilitation X
P – 31002-4 SCADA Migration X
P – 31002-5 Site Safety Improvements X
P – 31002-6 Replace Spare Grinder X
P – 31002-Recurring Unplanned Minor Rehabilitation X
P – 31002-Recurring Integration Assistance X
P – 31002-Recurring Grinder Rebuild X
P – 31002-Recurring Pump and Motor Rebuild X
P – 31002-Recurring VFD Repairs X
P – 31002-Recurring Coatings and Paintings X
ES – 31002-Recurring R-CAMP Update X
S – 9.2.001 Incompatible Metals X
P – 9.2.002 Pump Station D/B Improvement X
P – 9.2-Recurring Landscaping X
Carlsbad Water Recycling Facility
P – 38002-005 Minor Structural Rehabilitation X
05/13/2025 C9 851 of 1078
FY2023 R-CAMP Report

ES-7

Project Number Project Name EWA Owners
P – 38002-008 Miscellaneous Service Requests X
P – 38002-010 Minor EI&C Rehabilitation X
P – 38002-011 Minor Mechanical Rehabilitation X
P – 38002-012 Site Safety Improvements X
P – 38002-Recurring Coatings and Paintings X
P – 38002-Recurring Unplanned Minor Rehabilitation X
P – 38002-Recurring Integration Assistance X
P – 38002-Recurring VFD Repairs X
P – 38002-Recurring GMF Sand X
ES – 38002-Recurring R-CAMP Update X
S/P – 9.5.005 EQ Basin Water Quality X
S/P – 9.5.008 RO Rehabilitation X
S/P – 9.5.009 MF Rehabilitation X
S/P – 9.5.010 GMF Bypass X
P – 9.5.012 Operations and Administration
Building Roof
and HVAC
X
P – 9.5.013 Major Equipment CIP X
S/P – 9.5.014 Access between CWRF and CPS X
S/P – 9.5.015 Clean-In-Place Chemical
Optimization
X
S/P – 9.5.016 Facility Level Assessment X
P – 9.5-Recurring Landscaping X
ES.6. PROJECT EVALUATION
Projects in the R-CAMP are evaluated using a set of six evalu ation criteria. These evaluation criteria are assigned a criticality factor from 1 to 6, with 1 representing the lowest level of importance and 6 representing the highest. Table ES-2 provides the six evaluation criteria and their assigned criticality factors.

Table ES-2: Evaluation Criteria
Evaluation Criteria Criticality Factor
Safety 6
Regulatory Compliance 5
Reliability 4
Public and EWA Impacts 3
Energy Efficiency 2
Organizational Efficiency 1
Each project is assigned an impact factor across each of the six defi ned evaluation criteria from 0 to 5, with 0 representing the lowest impact and 5 re presenting the highest impact. The impact factors provide a relative comparison of each project’s ability to satisfy each of the defined evaluation criteria. 05/13/2025 C9 852 of 1078
FY2023 R-CAMP Report

ES-8

The impact factors assigned to a project for each evaluation criteria are then multiplied by the criticality factor of the evaluation criteria to calculate criteria scores. The six criteria scores are then summed to determine the evaluation score for each project.

ES.7. PROJECT PRIORITIZATION
Projects identified in the R-CAMP include those recommended for implementation in the next six fiscal years as well as other potential future pr ojects. Projects, studies , and professional services recommended for implementation over the next six fiscal years are considered prioritized projects and are identified in Table ES-3 through Table ES-7 along with a brief project description and evaluation score for each. A consequence of deferment for each project and study is al so provided in the table based on an impact factor of less than 3. The consequence of deferment represents the area of impact, across the evaluation criteria, where not implementing the project, study, or professional service would have a negative effect.
05/13/2025 C9 853 of 1078
FY2023 R-CAMP Report

ES-9

Table ES-3: Overview of BCPS Projects Recommended for Implementation for FY2023 ‐ FY2028 05/13/2025 C9 854 of 1078
FY2023 R-CAMP Report

ES-10

Table ES-4: Overview of RBPS Projects Recommended for Implementation for FY2023 ‐ FY2028 05/13/2025 C9 855 of 1078
FY2023 R-CAMP Report

ES-11

Table ES-5: Overview of BVPS Projects Recommended for Implementation for FY2023 ‐ FY2028 05/13/2025 C9 856 of 1078
FY2023 R-CAMP Report

ES-12

Table ES-6: Overview of AHLS Projects Recommended for Implementation for FY2023 ‐ FY2028 05/13/2025 C9 857 of 1078
FY2023 R-CAMP Report

ES-13

Table ES-7: Overview of CWRF Projects Recommended for Implementation for FY2023 ‐ FY2028 05/13/2025 C9 858 of 1078
FY2023 R-CAMP Report

ES-14

ES.8. RECOMMENDED PROJECT IMPLEMENTATION SCHEDULE AND

COST SUMMARY
The recommended project implementation schedule is based upon the project evaluation process and prioritized projects for projects in this R-CAMP. The capital acquisiti on budgets for EWA and recommended CIP projects for Owner projects over the next six years, FY2023 through FY2028, are summarized in Table ES-8. The R-CAMP identifies future expenditures for those capital acquisition budgets for maintenance projects and conceptually identifies EWA staff recommendations for capital improvement projects (CIP), which the respective facili ty Owner can then incorporate into their CIP for the facilities, including Owner’s review of capacity and upgrades.

In addition, subsequent R-CAMPs will monitor and re-evaluate proj ects in and beyond the six-year implementation schedule provided in this R-CAMP. Owners should incorporate R-CAMP recommendations for CIP, as well as Owner’s review of capacity and upgrades, and routinely review with their respective budget cycles. Common themes of these projects that should continue to be evaluated and considered include:

1. Rehabilitation and replacement of aging infrastructure

2. Facility expansion and coordinati on with Owner master planning efforts

3. Improvements to reduce impacts to the public and EWA (such as sound, appearance, and traffic)

4. Efficiency optimization

5. Future regulatory and industry trends
05/13/2025 C9 859 of 1078
FY2023 R-CAMP Report

ES-15

Table ES-8: Overview of Recommended Implementation Schedule for Prioritized Projects (FY2023 - FY2028) Remote Facilities
FY2023 FY2024 FY2025 FY2026 FY2027 FY2028 Total FY2023-2028 EWA Owner EWA Owner EWA Owner EWA Owner EWA Owner EWA Owner EWA Owner Buena Creek Pump Station $ 254,500 $ 1,346,000 $ 228,000 $ 3,000 $ 238,000 $34,000 $205,000 $496,500 $180,500 $465,500 $202,000 $123,000 $1,308,500 $2,468,000 Raceway Basin Pump Station $ 177,000 $ 215,000 $ 171,500 $ 383,500 $ 143,000 $ 356,500 $ 163,500 $ 54,500 $ 161,000 $ 54,500 $ 157,500 $ 3,000 $ 973,500 $ 1,067,000 Buena Vista Pump Station $ 394,500 $ 446,000 $ 296,800 $ 3,000 $ 275,200 $ 756,700 $ 194,500 $ 756,700 $ 198,000 $ 756,000 $ 194,500 $ 3,000 $1,553,500 $ 2,722,000 Ague Hedionda Lift Station $ 490,000 $ 3,005,000 $ 466,000 $ 3,005,000 $ 306,000 $ 30,000 $ 234,000 $5 , 000 $ 237,500 $5 , 000 $ 234,000 $ 5,000 $1,967,500 $ 6,055,000 Carlsbad Water Recycling Facility $ 396,900 $ 533,000 $ 416,500 $ 57,000 $ 389,500 $ 505,000 $ 374,500 $ 1,505,000 $ 162,500 $ 60,000 $ 219,500 $ 32,000 $1,932,000 $ 2,692,000 Total $ 1,712,900 $ 5,545,000 $ 1,579,500 $ 3,451,500 $ 1,352,500 $ 1,681,500 $ 1,171,500 $ 2,817,000 $ 939,500 $ 1,341,000 $ 1,007,500 $ 166,000 $7,735,500 $ 15,002,000 05/13/2025 C9 860 of 1078
FY2023 R-CAMP Report
1-1

1. INTRODUCTION
Encina Wastewater Authority (EWA) is a public joint powers authority located in Carlsbad, California, that provides wastewater treatment services to approximately 400,000 North San Diego County residents and industrial customers. EWA is comprised of six member agencies consisting of the City of Carlsbad, City of Vista, City of Encinitas, Buena Sanitation District, Leucadia Wastewater District, and Vallecitos Water District.

1.1 BACKGROUND
EWA was formed to operate and administer the Encina Water Pollution Control Facility (EWPCF), which is a secondary c onventional activated sludge treatment facility, to treat wastewater from the six member agencies. Was tewater is conveyed to the EWPCF by several pump stations throughout the service area. EWA contract operates and maintains four pump stations and one wastewater treatment plant producing Title 22 disinfected tertiary recycled water.

Facilities include: Buena Vista Pump Stati on (BVPS), Raceway Basin Pump Station (RBPS), Buena Creek Pump Station (BCPS), and Agua He dionda Lift Station (AHLS), as well as the Carlsbad Water Recycling Facility (CWRF). Up to 7 MGD of secondary effluent from the EWPCF may be pumped to the Carlsbad Water Recycli ng Facility (CWRF) for additional treatment to produce Title 22 disinfected tertiary recycled water for use in the Carlsbad Municipal Water District (CMWD) service area. The BCPS, RBPS, BVPS, AHLS, and CWRF are facilities that are owned by Carlsbad and/or Vista, and are operate d and maintained by EWA. These facilities are designated as “remote facilities” as they are not located at the EWPCF.

Site addresses and a brief description of each remote facility are provided below:
x Buena Creek Pump Station: 2080 South Melrose Dr, Vista, CA 92081 x Raceway Basin Pump Station: 2685 South Melrose Dr, Vista, CA 92081 x Buena Vista Pump Station: 2140 Jefferson St, Carlsbad, CA 92008 x Agua Hedionda Lift Station: Carlsbad Energy Center, 4720 Avenida Encinas, Carlsbad, CA 92009
x Carlsbad Water Recycling Facility: 6220 Avenida Encinas, Carlsbad, CA 92011

1.1.1. Buena Creek Pump Station
The BCPS is owned by the Buena Sanitation Dist rict (BSD) and was constructed in 2002. This wastewater pump station is located in the Shadowridge community of the City of Vista. The pump station conveys wastewater to the EWPCF. BCPS can be configured to also convey 1.16 MG to the Buena Yard (formerly known as the Shadowridge Reclamation Plant) for emergency storage capacity, which is currently not in service. An overview of facility components is provided in Table 1-1.
05/13/2025 C9 861 of 1078
FY2023 R-CAMP Report
1-2
Table 1-1: Buena Creek Pump Station Profile

1.1.2. Raceway Basin Pump Station
The RBPS is owned by the City of Vista and was replaced in 2007. The pump station conveys raw wastewater through the City of Vista’s force main to the EWPCF. An overview of facility components is provided in Table 1-2.

Table 1-2: Raceway Basin Pump Station Profile
Parameter Value
Design Capacity 1.9 mgd
Average Daily Flow (2021) 0.333 mgd
Number and Capacity of Pumps 3 submersible pumps @ 1,350 gpm each Pump Drives VFD driven, 75 hp each, 1,800 rpm max
Generator, Fuel One standby generator, 24-hr fuel tank (800 gallons) On-Site Storage 156,000 gallons of emergency storage

1.1.3. Buena Vista Pump Station
The BVPS is owned by the City of Vista (89.6%) and the City of Carlsbad (10.4%). The BVPS conveys flow to the EWPCF, and the pumps and piping were rebuilt in 1994. The pump station is located adjacent to the Buena Vista Lagoon at the intersection of Jefferson Street and Lagoon View Drive. The site is configured to provide eme rgency storage in and around the pump station. An overview of facility components is provided in Table 1-3.

Parameter Value
Design Capacity 8.8 mgd
Average Daily Flow (2021) 2.083 mgd
Number and Capacity of Pumps 5 centrifugal pumps @ 4,500 gpm each Pump Drives VFD driven, 125 hp each,
Generator, Fuel One standby generator, 24-hr fuel tank (400 gallons) On-Site Storage
95,000 gallons of emergency storage onsite with
approximately 176,000 gallons of storage in adjacent earthen basin
05/13/2025 C9 862 of 1078
FY2023 R-CAMP Report
1-3
Table 1-3: Buena Vista Pump Station Profile
Parameter Value
Design Capacity 23.1 mgd
Average Daily Flow (2021) 6.601 mgd
Number and Capacity of Pumps 4 vertical dry-pit pumps @ 6,000 gpm each Pump Drives VFD driven, 300 hp each
Generator, Fuel Two standby generators, 24-hr fuel tank (500 gallons per engine)
On-Site Storage 1,000,000 gallons of emergency storage
Pump Station Characteristics Dual force mains

1.1.4. Agua Hedionda Lift Station
The AHLS is owned by the City of Vista (69.1%) and the City of Carlsbad (30.9%). AHLS began operation in October 2019 with 50% of its pum ping capacity and the site is currently under construction to complete construction and demo lish the old station. The lift station includes two sets of pumps sharing the same wet well to convey flow to the EWPCF and nearby gravity sewer.

The AHLS is located adjacent to the Agua Hedi onda Lagoon, north of the Claude “Bud” Lewis Carlsbad Desalination Plant. An overview of facility components is provided in Table 1-4.

Table 1-4: Agua Hedionda Lift Station Profile
Parameter Value
Design Capacity 33 mgd
Average Daily Flow (2021) 8.860 mgd
Number and Capacity of Pumps Lift Station: 4 dry-pit pumps @ 4,861 gpm each Force Main: 4 dry-pit pumps @ 3,646 gpm each
Pump Drives Lift Station: VFD driven, 50 hp each, 710 rpm Force Main: VFD driven, 60 hp each, 1,190 rpm
Generator, Fuel One standby generator, 24-hr fuel tank (1,000 gallons) On-Site Storage None
Pump Station Characteristics
Lift pumps discharge to gravity sewer, Force Main pumps discharge to 36” force main which breaks to gravity south of Cannon Rd into a 54” sewer to EWPCF.

1.1.5. Carlsbad Water Recycling Facility
The CWRF is owned by the Carlsbad Municipal Water District (CMWD), a district of the City of Carlsbad, and was constructed in 2005 and was most recently expanded in 2016. The Plant is located immediately to the south of the EWPCF. The rated capacity of the CWRF is 7 mgd. The CWRF treatment process includes granular media filters (GMF), microfiltration (MF), reverse osmosis (RO), ultrafiltration (UF), and disinfection through dosage of sodium hypochlorite. The MF and RO systems are not currently in service . The Equalization Basin at the CWRF is owned by EWA and provides a total of 8 million gallons of storage capacity through two compartments.

The west compartment is used primarily for re cycled water but can be used for secondary 05/13/2025 C9 863 of 1078
FY2023 R-CAMP Report
1-4
equalization in wet season, and the east compartm ent is intended for secondary equalization with the option to use it for recycled water during dry season if secondary equalization is not required.

The Plant began producing Title 22 recycled wate r in November 2005. During the first full year of operation, CMWD distributed 165 million gallons (512 acre-feet) of recycled water from the CWRF for use throughout the City of Carlsbad. From January 2021 to December 2021, the CMWD distributed 739.27 million gallons (1,881 acre-feet).

1.2 PURPOSE
EWA aims to maintain reliable and cost-effective resilient service by implementing proactive asset management approaches. In addition, EWA’s objective is to invest appropriately to fully fund the cost of service, including capital improveme nts by establishing a well-grounded Asset Management Planning Services. The Remote Comprehensive Asset Management Plan (R-CAMP) serves as a primary planning tool utilized to cost effectively manage assets by planning, prioritizing, and scheduling condition assessments efforts and asset rehabilitation and replacement (R&R) for facilities operated by EWA, including the BCPS, RBPS, BVPS, AHLS, and CWRF.

The R-CAMP serves as a planning tool used to cost effectively manage remote assets. The Owners have invested significant resources in the remote facilities, and EWA places a high importance on preserving asset reliability of the remote facilit ies while protecting the health and safety of its workers and the public. The focus of the majo rity of the projects identified in the R-CAMP are safety, regulatory compliance, reliability, publ ic and EWA impacts, energy or organizational related.

The purpose of the R-CAMP is to provide a comprehensive and reliable planning tool to successfully address infrastructure needs and challenges. The R-CAMP and related documentation has been developed to provide an updated assessment for major equipment and facilities. This allows EWA and Owners to plan ongoing assessment and replacement of assets while considering future expansion of the facilities. Capital assets related to EWA’s EWPCF are not evaluated in this R-CAMP as those are provided in the E-CAMP.

The R-CAMP provides a project implementation schedule and cost summary for the next six fiscal years (FY) (FY2023 through FY2028). While the R-CAMP is independent of the budgeting process, the information is leveraged during the budgeting process as well as providing direction for EWA and Owners staff. The MOU between Owne rs and EWA as operators and maintainers requires EWA to develop the capital acquisiti on budget for each facility, as well as make recommendations for larger projects for Owners to incorporate into their CIPs.

The R-CAMP identifies future expenditures for those capital acquisition budgets for maintenance projects and conceptually identifies EWA staff recommendations for capital improvement projects (CIP), which the respective facility Owner can th en incorporate into their CIP for the facilities, including Owner’s review of capacity and upgrades. The R-CAMP then functions as a communication tool for the proposed improvements to the Owners, their representatives, and EWA staff. Ultimately, the EWA Board of Directors, including the Owners’ Board Members,considers 05/13/2025 C9 864 of 1078
FY2023 R-CAMP Report
1-5
the approval of the EWA staff recommendations for capital acquisitions at the remote facilities, while the Owners teams review and develop the CIP for each of the remote facilities. 05/13/2025 C9 865 of 1078
FY2023 R-CAMP Report
2-1

2. REMOTE COMPREHENSIVE ASEET MANAGEMENT PLAN

PROCESS
This section outlines EWA’s approach and basic framework behind the R-CAMP process, which parallels the E-CAMP process. The R-CAMP process incorporates project identification based on asset inventory and ongoing condition assessments. The R-CAMP helps establish capital rehabilitation project planning with considerati on given to anticipated changes in regulatory compliance, cost-saving opportunities, available funding, and ongoing operations and maintenance (O&M) requirements.

2.1. PROCESS
The R-CAMP process includes five primary task elements which are as follows:
x Task Element 1 – Project Identification and Grouping
x Task Element 2 – Project Evaluation
x Task Element 3 – Project Cost Estimating
x Task Element 4 – Project Prioritization
x Task Element 5 – Implementation Schedule
A flow diagram of the EWA CIP development, including the R-CAMP process and Asset Management process, is provided as Figure 2-1. The following subsections provide detail on the five R-CAMP process task elements listed above. As part of the R-CAMP process, projects are assigned to either EWA or Owners. Smaller maintenance projects are generally assigned to EWA, and larger capital projects are generally assigned to Owners, since there are some efforts that may be better suited to a particular lead agency. EWA and the Owners may use this information when developing their FY budgets.
05/13/2025 C9 866 of 1078
FY2023 R-CAMP Report
2-2
Figure 2-1: Project Development Process
05/13/2025 C9 867 of 1078
FY2023 R-CAMP Report
2-3

2.1.1. Project Identification and Grouping
The first step of the R-CAMP process is identification and grouping of projects. Projects that are included in the R-CAMP are identified through a number of means including EWA’s Computerized Maintenance Management System (CMMS), condition assessments, probability of failure, risk, the previous R-CAMP, EWA or Owners staff, studies, reports, other engineering services performed for EWA or the Owners, re gulatory environment, and industry trends. The identified projects are reviewed and discusse d with EWA and Owners staff regarding their inclusion in the R-CAMP. This section will discuss the methods that are used to identify the projects.

2.1.2. Computerized Maintenance Management System
EWA manages its assets through the CMMS eMai nt by Fluke. The CMMS tracks assets for preventative maintenance activities which generall y repair or upgrade minor assets as well as major assets that are replaced or upgraded through capital projects. When the CMMS identifies an asset that is within approximately five years of the end of its nom inal service life, a condition assessment will be triggered.

EWA has recently incorporated asset management calculations such as remaining useful life analysis, risk assessment and cost estimating with in eMaint to streamline the projection of R&R based on the existing condition and other asset data. The work order process has also been updated to allow operations and maintenance staff to submit a condition score for the assets as they close the work orders. This allows EWA to make renewal decisions based on the latest condition of the assets rather than their age.

2.1.3. Condition Assessments
Condition assessments are a key component of a strong asset management program and provide a solid basis for future decision making by providing up-to-date information that is used to confirm the concerns that have been raised and identify ne w concerns and risks. Decisions leading to the R&R of assets rely on a clear unde rstanding of the condition of its i nfrastructure and how it is performing. Poor or missing asset condition informati on could result in the inability to identify a potential failure of an asset which can have consequences that constitute a business risk or potential loss. This would leave limited options which coul d require the asset to be replaced reactively instead of proactively, usually the more expe nsive option. By conducting regular comprehensive condition assessments and monitoring asset performance, rehabilitation strategies can be defined, and replacement schedules determined that can result in the lowest net-life capital and O&M costs.

This exercise allows EWA to better understand the remaining useful life of the assets, plan ongoing assessment efforts, update maintenance schedules
, updating total asset management costs and
funding needs, and more effectively manage assets. Capital expenditures can be prioritized by ranking asset replacement to maintain and replace th e assets which maximizes the service life at the lowest overall cost.

Hazen performed condition assessment on BCP S, RBPS and BVPS in May 2021 followed by observations during the site walk performed in October 2021. A condition assessment documents 05/13/2025 C9 868 of 1078
FY2023 R-CAMP Report
2-4
the current condition of the asset(s) being assessed and recommends one of the following when it is completed:

1. For assets with remaining useful life, the a ssessed service life can be extended assuming a cost-effective level of maintenance. The CMMS will be updated to reflect the new assessed service life.

2. For assets with a near-term end of useful life, a project is identified to replace or rehabilitate the asset. After the asset is replaced or rehabilitated, the CMMS will be updated to reflect the new asset information.

3. For assets with condition sc ore of Poor and Fair, a project is identified to perform a proper R&R action. Depending on the type of action (re placement or repair), the CMMS will be updated to reflect the new asset information including condition score.

2.1.4. Previous Remote Comprehenisive Asset Management Plan The previous R-CAMP (2021) was used as another source to identify projects to include in the R- CAMP currently being prepared. The previous R-CAMP includes a comprehensive list of projects and recommendations that were formerly identified for the remote facilities. This list, the outcome of subsequent budgeting cycles, and EWA i nput are used to identify which previous R-CAMP projects should be included. The following summarizes which projects from the previous R-CAMP are either included or not included in the current R-CAMP:

Included

1. Projects that were not selected for implementation in either the previous R-CAMP or through the budgeting process.

2. Projects that were selected for implementation in the previous R-CAMP but were only partially funded or were not completed or funded as recommended based on the budgeting process.

Not Included

1. Projects that were selected for implementation in the previous R-CAMP and were completed or funded as recommended based on the budgeting process.

2. Projects that were previously identified or recommended but not selected through the budgeting process that have since been classi fied as projects that should not be included. A project may be chosen to not be included for reasons such as the project may not meet cost/benefit requirements, or it has been determined it does not need to be completed.
05/13/2025 C9 869 of 1078
FY2023 R-CAMP Report
2-5

2.1.5. Other Project Sources
In addition to the previous R-CAMP, CMMS, and recent condition assessments, other sources of information are sought, reviewed and evaluated for inclusion in the FY2023 R-CAMP. Projects to be included in the R-CAMP may be identified from the following:

1. EWA and Owners Staff – Staff observations of the operational performance and condition of an asset may trigger a Level 1 (Visual) condition assessment to be completed in advance of the CMMS triggering a condition assessment, which could result in the identification of a project. Additionally, EWA and Owners st aff are encouraged to provide input on potential process improvements that might require new assets.

2. Studies and Reports – Studies and reports are routinely completed including conceptual studies, special studies, and master plans. These studies and reports may recommend projects to be completed which could be incorporated into the R-CAMP including:
x Outstanding projects identified in FY2021 R-CAMP
x Fats, Oils, and Grease Mitigation Re commendation Technical Memorandum (2021)
x SCADA Migration Design Concept (2021)
x Carlsbad Recycled Water Quality (2020)

3. Engineering Services – Professional engineering service s are provided to EWA and the Owners on an ongoing basis. Through these serv ices, projects may be identified which could be incorporated into the R-CAMP.

4. Regulatory Environment – Changes to regulations or legislation may impact operations at the remote facilities. Based on these changes, projects may be identified which could be incorporated into the R-CAMP.

5. Industry Trends – Trends within the wastewater and water industry such as climate change, water reuse, and technology, may impact operations at the remote facilities. Projects may be identified based on these trends which could be incorporated into the R-CAMP.

2.1.6. Project Reference List
This R-CAMP includes projects for BCPS, RBPS, BVPS, and CWRF based on the Kennedy Jenks. (2020), FY 2021 Remote Comprehensive Asset Management Plan (R-CAMP) technical report and the new defined projects for AHLS that was under construction previously.

2.1.7. Project Grouping
Grouping of R-CAMP projects occurs after all projec ts to be included in the R-CAMP have been identified. Where practical, projects may be groupe d into a single project to increase economic efficiency and reduce costs. Projects can be group ed together based on several considerations including proximity of project locations, type of work, or priority of the projects to increase economic efficiency and reduce costs. After project grouping is completed, a final list of projects 05/13/2025 C9 870 of 1078
FY2023 R-CAMP Report
2-6
to be included in the R-CAMP is established. Each individual item in a project can be identified based on the source of information used (Staff, Condition Assessment, etc.) to include that item for R-CAMP projects. After the final list of R-CAMP projects is established, EWA and the Owners work together to assign each project to the responsibility of EW A or the Owners. Smaller maintenance projects are assigned to EWA and larger capital projects are assigned to Owners.

2.1.8. Project Numbering
Projects are given unique numbers for identific ation purposes. Condition assessments, studies, updates, engineering services and other services are also numbered in accordance with the project numbering system. The numbering system for projec ts assigned to EWA is different than the numbering system for projects assigned to Ow ners. The numbering system for EWA projects consists of three segments as described below and depicted in Figure 2-2 using P-38002-001 as an example while the numbering system for Owners projec ts consists of four segments as described below and depicted in Figure 2-3 using P-9.5.005 as an example. A summary of the project numbering system breakdown structure for Owne rs projects and how it relates to projects identified in the E-CAMP and R-CAMP is presented in Table 2-1.

EWA Projects
Figure 2-2: Mobile Collection Tools and Condition Scoring Guide x The first segment is an alpha reference repr esenting the phase of the improvement. In the example, the letter “P” designates that it is a capital construction or planned maintenance project. Other alpha abbreviations include: CA – Condition Assessment, S – Study, ES – Engineering Services, and OS – Other Services.
x The second segment (38002) is a five‐digit number associated with the EWA organization number for the remote facility. Numbers include 31002 – Agua Hedionda Lift Station, 32002- Buena Vista Pump Station, 37002 – Buena Creek Pump Station, 38002 – Carlsbad Water Recycling Facility, and 39002 – Raceway Basin Pump Station. x The third segment is a three-digit number associated with each specific project. This number increases sequentially as projects are identified. Recurring projects are not given a unique number and are shown as -Recurring.
05/13/2025 C9 871 of 1078
FY2023 R-CAMP Report
2-7
Owners Projects
Figure 2-3: Mobile Collection Tools and Condition Scoring Guide x The Owner project numbering system is reflecti ve of the numbering system used for the previous R-CAMP.
x The first segment is an alpha reference repr esenting the phase of the improvement. In the example, the letter “P” designates that it is a capital construction or planned maintenance project. Other alpha abbreviations include: CA – Condition Assessment, S – Study, ES – Engineering Services, and OS – Other Services.
x The second segment is a one-digit number (9) which corresponds to an EWA remote facility.
x The third segment is a one-digit number (5) which corresponds to the CWRF in this example.
x The fourth segment is a three-digit number a ssociated with each specific project. This number increases sequentially as projects are identified.

Table 2-1: Project Numbering System
Owner Projects Guideline
P-2 Outfall (refer to the E-CAMP)
P-3 Solids Process (refer to the E-CAMP)
P-4 Energy Management (refer to the E-CAMP)
P-5 General (refer to the E-CAMP)
P-6 Technology (refer to the E-CAMP)
P-7 Reserved (refer to the E-CAMP)
P-8 Professional Services (refer to the E-CAMP)
P-9 Remote Facility
Improvements
P-9.1 Raceway Basin Pump Station
(Owner)
P-39002 Raceway Basin Pump Station (EWA)
P-9.2 Agua Hedionda Lift Station
(Owner)
P-31002 Agua Hedionda Lift Station (EWA)
P-9.3 Buena Vista Pump Station
(Owner)
P-32002 Buena Vista Pump Station (EWA)
05/13/2025 C9 872 of 1078
FY2023 R-CAMP Report
2-8
Owner Projects Guideline
P-9.4 Buena Creek Pump Station
(Owner)
P-37002 Buena Creek Pump Station (EWA)
P-9.5 Carlsbad Water Recycling Facility
(Owner)
P-38002 Carlsbad Water Recycling Facility
(EWA)
P-9.6 Reserved
P-9.7 Reserved
P-9.8 Remote Facilities – General Projects
P-9.9 Professional Services

2.1.9. Project Evaluation
After the final list of projec ts to be included in the R-CAMP is established, each project is individually evaluated by EWA a nd Owners staff using a set of six evaluation criteria: safety, regulatory compliance, reliability, impacts to the public and EWA, energy efficiency, and organizational efficiency. These evaluation criteria are assigned a criticality factor that represents the level of importance of each across all the projec ts. The criticality factors stay with their corresponding evaluation criteria throughout the project evaluation process.

Each project is assigned an impact factor acro ss each of the evaluation criteria which provides a relative comparison of each project’s ability to sa tisfy each of the criteria. The impact factors assigned to a project for each evaluation criteria are multiplied by the cr iticality factor of each evaluation criteria to develop criteria scores. The sum of these six criteria scores is the evaluation score for each project. The criteria score calculation is illustrated below, and the project evaluation process is discussed in further detail in Section 6 of this R-CAMP. ݎ݋ݐܿܽܨݐܿܽ݌݉ܫ

2.1.10. Project Cost Estimating
Project cost estimates are developed for th e final list of projects included in the R-CAMP. The estimates were reviewed by EWA and Owners staff for incorporation into the R-CAMP. The project cost estimates included in the R-CAMP include construction, condition assessment, study, design, engineering during construc tion, and construction management costs. These costs allow for current and future budgetary planning as part of the CIP.

R-CAMP projects have varying levels of detail and some are more defined than others. Generally, the cost estimates are Class 4 planning level cost s with a level of accuracy commensurate with levels developed by the Association for the Advancement of Cost Engineering (AACE) International which is provided in Table 2-2. As individual projects move advance with scope definition and design, the cost estimates should correspondingly be revised. 05/13/2025 C9 873 of 1078
FY2023 R-CAMP Report
2-9
Table 2-2: Cost Estimate Classification Matrix for Process Industries Primary Characteristic Secondary Characteristic
Estimate
Class
Maturity Level of Project
Definition Deliverables
Expressed as % of
complete definition
End Usage
Typical purpose
of estimate
Methodology
Typical estimating method
Expected Accuracy
Range
Typical variation in
low and high ranges
Class 5 0% to 2% Concept
Screening
Capacity factored,
parametric models,
judgment, or analogy
L: -20% to -50%
H: +30% to +100%
Class 4 1% to 15% Study of
feasibility
Equipment factored or
parametric models
L: -15% to -30%
H: +20% to +50%
Class 3 10% to 40%
Budget
authorization or
control
Semi-detailed unit costs
with assembly level line
items
L: -10% to -20%
H: +10% to +30%
Class 2 30% to 75% Control or
bid/tender
Detailed unit cost with
forced detailed take-off
L: -5% to -15%
H: +5% to +20%
Class 1 65% to 100% Check estimate
or bid/tender
Detailed unit cost with
detailed take-off
L: -3% to -10%
H: +3% to +15%
Source: AACE International Recommended Practices 18R-97 Project costs estimates are developed through the following means:

1. Cost estimates for projects that were previously prepared outside of the R-CAMP, such as in studies, reports, or condition assessments, are incorporated into this R-CAMP.

2. Cost estimates for projects that were previously prepared as part of EWA’s previous budgeting process are incorporated into the R-CAMP.

3. Cost estimates for projects that were previously prepared as part of previous R-CAMP are incorporated into this R-CAMP.

4. Cost estimates of projects and items within the projects not previously developed are prepared and incorporated into the R-CAMP.

For cost estimates that were previously prepared, the Inflation Factor was applied to the previously prepared cost estimates. Cost estimates for this R-CAMP were updated to January 2022 (CCI 12996.09).

The baseline percentages for estimating const ruction costs are provided in Table 2-3. These percentages may be adjusted, at the discretion of the engineer/cost estimator, for each project if there is a greater amount of information known and de tail available to better define the project.

These percentages may also be adjusted if a previous cost estimate for the project was developed. 05/13/2025 C9 874 of 1078
FY2023 R-CAMP Report
2-10
Table 2-3: Construction Cost Baseline Percentages
Description Percentage
Contractor Overhead and Profit 27%
Shipping Rate 40% of the total is shipped at 15%
Sales Tax 50% of the total is taxed at 7.75%
Project Contingency 40%
Allowance amounts for additional project phase co sts for condition assessments, studies, design, engineering during construction, construction man agement, and electrical, instrumentation and control (EI&C) are included in the cost esti mates based upon percentages of construction costs.

The baseline rates for estimating these project pha se costs are provided in Table 2-4. These rates may be adjusted, or minimum costs may be used, at the discretion of the engineer/cost estimator, for each project. These rates may also be adjusted if a previous cost estimate for the project was developed. As detailed scoping of proj ects is defined and design level phases progress, these percentages should be revisited to review applicability of each cost and percentage.

Table 2-4: Project Phase Costs Baseline Rates
Project Phase Rate Contingency
Condition Assessment 1.5% 20%
Conceptual Study 2.5% 20%
Design 8.0% 15%
Engineering During Construction 4.5% 15%
Construction Management 5.5% 20%
EI&C – Design 0 – 5% --
EI&C – Construction 0 – 5% --
A Basis of Estimate (BOE) which provides addition al costing assumptions and stipulations not summarized in this project cost estimating secti on is included as Appendix C. Cost estimates for the projects included in this R-CAMP are provided in Appendix D. Notes are included for each cost estimate providing additional information such as the source of the cost estimate and adjustments made in the percentages or rates.

EWA and Owners should implement sound project bidding practices to control project costs including pre-purchasing major assets to elimina te contractor mark-up, bid projects at a time of the year when the bidding climate is favorable, and design and bid similar projects together.

2.1.11. Project Prioritization
All projects identified in the R-CAMP are then prioritized by considering the evaluation scoring results and estimated costs. The scoring results di rectly relate to the impact that a project would have to EWA and Owners (a proj ect with a higher score woul d have a higher impact). Through this comparison projects may be assigned to one of four categories: (1) low cost and high impact, 05/13/2025 C9 875 of 1078
FY2023 R-CAMP Report
2-11
(2) high cost and high impact, (3) low cost and low impact, and (4) high cost and low impact. The benefit of this approach is that it allows EWA and Owners to better identify both cost and impact when prioritizing projects. The project prioritizati on process is discussed in further detail in Section 6 of this R-CAMP.

2.1.12. Implementation Schedule
The project prioritization process described ab ove provides EWA and Owners with informed condition and cost data to selec t which projects to schedule for implementation over the next six fiscal years (through FY2028). A recommended im plementation schedule is provided in Section

7. Projects that are not selected for implementation over the next six fiscal years are not scheduled or cash flowed in the R-CAMP. The implementation schedule is discussed in further detail in Section 7 of this R-CAMP.

2.1.13. Frequency of R-CAMP
The R-CAMP has historically been completed every two years. Vista has expressed some interest in reducing the frequency of R-CAMP updates. The Owners can decide to modify the frequency, but EWA recommends continuing the curren t frequency for the stations that are undergoing substantial improvements in the next few years so that EWA and Owners can adjust budgets as necessary. Both BVPS and AHLS are good exam ples of pump stations with significant improvements within the next few years and potentially a relocation for BVPS within the next 5- 10 years. It is recommended that R-CAMP to be updated every 2 years until the major renewals and improvements are implemented and then the frequency to be arranged based on the progression and dependency of the defined projects for e ach individual facility. Given that many projects initiate with preliminary study, it is importan t to communicate the progression on the identified tasks followed by recommendations and potential n eeds of the project. This is particularly important for the facilities that are undergoing major changes based on the R-CAMP assessments (i.e., BVPS relocation feasibility).
05/13/2025 C9 876 of 1078
FY2023 R-CAMP Report
3-1

3. CONDITION ASSESSMENT SUMMARY
The benefit to a utility of a quantitative conditi on assessment is to better estimate both the estimated timing of asset failure and the impact such a failure would have on broader operations.

This allows EWA to develop more informed asset management pl ans and capital budget prioritization processes. While the age of an asset is an important consideration, the likelihood of an asset failing is mostly dependent upon the cond ition of the asset. As the condition of an asset deteriorates, the likelihood of fa ilure increases. Ultimately, th e goal of any condition assessment protocol is to acquire a more accurate knowledge of the timing of an asset failure. Having more confidence in determining asset failures and renewal needs will lead to more efficient and effective use of resources, and funds. Combination of fiel d condition assessment and focused condition assessment are performed. For the BCPS, RBPS, and BVPS a comprehensive condition assessment was performed in May 2021 followed by a site visit in October 2021, while for CWRF the focused condition assessment approach was used. Given that AHLS has recently undergone construction and significant rehabilitation effort, a site visit was performed for this remote facility.

3.1. FIELD CONDITION ASSESSMENT
In order to assess the current condition and the timing to asset failure, it is important to understand the ways an asset can fail. Assets can fail in four major ways (capacity, level of service, physical mortality, and financial efficiency) known as fail ure modes (shown in Table 3-1), which were used to assess the condition of each asset. Th ese failure modes were considered during the condition assessment and a condition score was a ssigned based on the most imminent failure mode.

Table 3-1: Failure Modes
Failure Mode Definition Tactical Aspects
Capacity Volume of demand exceeds design capacity Growth, System expansion Level of Service Functional requirements exceed design
capability
Codes & permits: NPDES, OSHA,
noise, odor, life safety, service level,
etc.

Mortality Consumption of asset reduces performance
below acceptance level
Physical deterioration due to age,
usage (including operator error), acts
of nature
Efficiency Operations costs exceed that of feasible
alternatives Pay-back period
A Level 1 (visual) condition asse ssment was conducted to assess the mechanical, electrical, and structural conditi ons of assets in BCPS, RBPS, and BV PS on May 2021. Condition of assets, system redundancies, installation years, quantitie s, and O&M assessment/needs were identified during the on-site facility condition assessmen t. Additionally, inputs from EWA staff, or contractors, as to when the asset was last serviced was used to complete the condition assessment. 05/13/2025 C9 877 of 1078
FY2023 R-CAMP Report
3-2
Asset condition was determined via visual inspecti on. Field observations were recorded with mobile devices utilizing customized condition assessment forms. The condition scoring system utilized and mobile devices with electronic forms is presented in Figure 3-1 . The condition assessment team assigned condition scores based on the International Infrastructure Management Manual with a rating range from 1 (Excellent condition) to 5 (Poor condition). Descriptions for each rating enable analysts to a ssign ratings to assets. All the data collected for each asset, including photographs of the assets, the inspectors’ notes, condition scores for specific attributes, inspection checklists, etc., was stored digitally.
05/13/2025 C9 878 of 1078
FY2023 R-CAMP Report
3-3
Figure 3-1: Mobile Collection Tools and Condition Scoring Guide Figure 3-2 provides a summary of the overall condition assessment results by condition score 1 through 5.
05/13/2025 C9 879 of 1078
FY2023 R-CAMP Report
3-4
Figure 3-2: Field Condition Assessment Results for BCPS, RBPS, and BVPS The condition rating of the assets was derive d based on physical assessment and performance assessment of assets. The results of condition assessment are leveraged as one of the primary sources for identifying the needs for R&R act ions as well as required performance and maintenance activities to support operations. The detailed results of condition assessment are provided in Appendix F.

3.2. FOCUSED CONDITION ASSESSMENT
In the focused condition assessment approach, th e condition assessments are triggered by staff recommendation or when the CMMS identifies an asset that is within approximately five years of the end of its nominal service life or by staf f observations of condition. EWA manages its assets through its CMMS, eMaint, to whic h it recently transitioned from Munis. As a result, 132 assets are identified on CWRF for the Level 1 (vi sual) condition assessment. In October 2021, the condition assessment was performed for CWRF, and the results presented in Figure 3-3. 0 10
20 30
40 50
60 70
80 90

BCPS BVPS RBPS
Count of Assets
Facility
1-Excellent 2-Good 3-Average 4-Fair 5-Poor
05/13/2025 C9 880 of 1078
FY2023 R-CAMP Report
3-5
Figure 3-3: Field Condition Assessment Results for CWRF The detailed results and the associated sources are provided in Appendix F. It is anticipated the next update to the R-CAMP will provide re gular condition assessments for FY2025 through FY2030.
12 127
266
26 5
0 50
100
150
200
250
300
1-Excellent 2-Good 3-Average 4-Fair 5-Poor
Count of Assets
Conditon
05/13/2025 C9 881 of 1078
FY2023 R-CAMP Report
4-1

4. STUDIES AND OTHER PROFESSIONAL SERVICES

4.1. STUDIES
Studies are necessary to provide planning informati on for maintaining the facilities. Studies are designated with an “S” prefix and are numbered according to their associated capital project. The studies are categorized as either “Conceptual Studies” or “Special Studies ”. Conceptual studies may be performed for more complex projects to de fine options to meet project requirements, to provide a life-cycle cost analysis of options, and evaluation of non-monetary factors. Special studies generally focus on organizational or facility-wide planning needs.

Descriptions of Special Studies and Conceptual Studies identified as part of this R-CAMP process are summarized below. Special and Conceptual Studi es have been assigned to either EWA or Owners and are provided for each facility.

4.2. BUNEA CREEK PUMP STATION STUDIES

4.2.1. EWA Studies
No studies assigned to EWA have been identified.

4.2.2. Owners Studies
S/P-9.4.008 Bypass
EWA staff noted that there is a n eed to bypass pump system installation so that the entire station can be bypassed in a proper and efficient way as needed. As an example, Scum and FOG abatement study was performed for BCPS, and the top three choices were identified. The Owner is ready to implement the recommended improvements for Scum and FOG mitigation, while there is a need for a bypass installation to facilitate the recommended improvements. This bypass pumping study will evaluate adding the allowance for bypass pump system installation on the BCPS. This study also aims to evaluate the possibility of simult aneous execution of the Mechanical Modification (formerly Modify Discharge Valve Installation) project and Scum and FOG abatement project.

Using the bypass pump system installation can facilitate the implementation of the aforementioned projects at the same time which helps reduce the cost by $0.5M.

4.3. RACEWAY BASIN PUMP STATION STUDIES

4.3.1. EWA Studies
No studies assigned to EWA have been identified.
05/13/2025 C9 882 of 1078
FY2023 R-CAMP Report
4-2

4.3.2. Owners Studies
S/P-9.1.006 Containment Basin Repair
The containment basin at RBPS is used for up to 156,000 gallons of emergency storage during an interruption in pumping. The basin has noticeable cracking and most of the joint filler material needs repair, which allows consistent groundwater infiltration. Preliminary investigations have determined that repair of the ba sin should include pressure relief from the groundwater pressure anticipated beneath the basin once the infiltrati on has been mitigated. It should be noted that the groundwater is expected to continue infiltra ting into the basin by addressing the structural deficiencies of basin (i.e., cracks and joint fillers). However, the basin can drain by gravity to the wet well. Also, a sump pump can be added as an additional alternative for draining the wastewater from the basin.

Figure 4-1: Field Condition Assessment Results for CWRF The basin is also difficult to access, as the pump station access road ends prior to the containment basin access gate, the access gate is within proximity to nearby shrubbery, and the access gate has been placed at an offset from the containment basin access ramp.

This study is related to the 2014 R-CAMP study S-9.1.001 (2021 R-CAMP study S-9.1.006) and
will evaluate potential methods of pressure relief and repair for the containment basin as well as improve basin access. It is recommended for this study to evaluate modification of the basin fence line to allow a vactor truck to offload into the containment basin if necessary. Access from either the Faraday side, the Melrose side, or both is desired. Modification of the containment guardrail may be required pending the placement of the fence line.

S/P-9.1.009 Pump Station Resiliency
The RBPS is located within close proximity to a nearby creek. With climate change, large storms may become more frequent and more significant, which could cause flooding at the site during heavy storm events. The SDG&E cabinet is located along the back of the pump station building, which is within sufficient proximity to the creek to be at risk of flood damage. 05/13/2025 C9 883 of 1078
FY2023 R-CAMP Report
4-3
This study is related to the 2021 R-CAMP study S-9.1.009 and will assess the potential for future flooding and will investigate options to protect the SDG&E cabinet and other key assets from potential flooding, such as elevating equipment or building an embankment.

4.4. BUNEA VISTA PUMP STATION STUDIES

4.4.1. EWA Studies
No studies assigned to EWA have been identified.

4.4.2. Owners Studies
S-9.3.010 Buena Vista Pump Station Facility-Level Alternative Analysis (Formerly known as Relocation Study)
This facility-level alternative analysis is a study to determine the future of the pump station. The analysis would help select an alternative or a pha sing plan that considers cost, benefits, levels of service, and other future goals associated with the pump station, such as expansion plans.

Alternatives to consider include:
x Replace BVPS with a new pump station
x Keep the existing pump station and implement Major Equipment CIP x Phasing between implementing a major CIP and building a new pump station x Evaluation of generator system
The results of this study will need to be inco rporated into the Major Equipment CIP project and closely coordinated with other rehabilitation ef forts, as the Owners may choose to run certain assets to failure leading up to a full station rep lacement, rather than investing in significant rehabilitation. This effort will be a feasibility and planning study to assess replacing the existing BVPS with a new pump station in the next 5-7 y ears. The study will need to assess project objectives, potential locations, permitting approach, timeline, and planning level costs. The results will need to be incorporated into the next cycle of R-CAMP and closely coordinated with other rehabilitation efforts, as the Owners may choose to run certain assets to failure leading up to a full station replacement, rather than investing in significant rehabilitation.

S/P-9.3.008 Major Equipment CIP
The scope of Major Equipment CIP project includes tasks associated with large facility component replacement or repair required within the next 3-5 to be coordinated with facility level alternative analysis and future master plans. There is an in itial study phase to ev aluate the priority and feasibility of implementing the repair or rehabi litation of large facility component based on the facility-level alternative analysis and the needs identified through future master plans. The list of facility components requires replacement or repair within the next 3-5 years depending on the facility level alternative analysis are as follow:
x Automatic Transfer Switch
05/13/2025 C9 884 of 1078
FY2023 R-CAMP Report
4-4
x Motor Control Center
x Switchboard
x HVAC
x Headworks gates and grinders
x Valves
x Grating
x Roofing
x Evaluation of berm

4.5. AGUA HEDIONDA LIFT STATION STUDIES

4.5.1. EWA Studies
No studies assigned to EWA have been identified.

4.5.2. Owners Studies
S-9.3.001 Incompatible Metal
This study has been identified based on the site assessment in October 2021 and notes provided by EWA staff. This study will evaluate and iden tify the incompatible metals throughout the facility and provide recommendations for repair or replacement.

4.6. CARLSBAD WATER RECYCLING FACILITY STUDIES

4.6.1. EWA Studies
No studies assigned to EWA have been identified.

4.6.2. Owners Studies
S/P-9.5.008 RO Rehabilitation
This study will evaluate the rehabilitation a nd replacement required to recommission the RO system at a future date. This effort will be a planning study to assess the condition of assets in RO system and the recommissioning RO system in order to make it operable, if Owner determines this is best option to meet Carlsbad recycled water quality and supply goals.

RO membrane replacement suggested per RO Inspection Report and 2014 R-CAMP project P-

9.5.003 Reverse Osmosis Membrane Replacement.

Additionally, based on the 2014R-CAMP project P-9.5.004 RO Chem Feed System Modifications, Water Quality study is needed to verify th e need for sulfuric acid and assess membranes and operations to account for changes to the supply water quality from conservation, desalination, and State Water Project water versus Colorado River Water.
05/13/2025 C9 885 of 1078
FY2023 R-CAMP Report
4-5
According to the 2021 R-CAMP, the following recommendations had been made based on the RO Inspection Report and the condition assessment:
x Remove remaining stored sulfuric acid and implement storage tank protection x Replace the missing vent valve on top of the sulfuric acid tank x Paint exposed PVC, fiberglass railing, and rusted parts x Consider repairing ends of damaged RO vessels
x Protect instruments showing signs of corrosion
x Place fresh desiccant in all electrical panels and seal the panels properly on all sides to prevent moisture from entering the panel
x Review and revise preventative maintenance program
o Exercise pumps and motors quarterly, or at a minimum every six months, to o prevent frozen bearings
o Replace desiccant in electrical panels at recommended frequency or when color o change indicates spent desiccant
o Exercise motorized and manual valves quarterly, or at a minimum every six o months, to prevent sticking
The RO rehabilitation project is dependent upon the outcome of the facility-level assessment that includes a study on the feasibility of RO, MF and UF processes to identify alternatives. The condition of MF and RO is unknown as they ha ve not been operating for a long time and recommissioning may not be technically or economically viable. A study can confirm which action can be more beneficial.

This study assists to determine whether it is a need to bring the RO back online and to identify the most feasible and best economical approach to meet Carlsbad recycle water quality and supply goals.

S/P-9.5.009 MF Rehabilitation
This study will evaluate the rehabilitation and replacement required to recommission the MF system at a future date. This effort will be a planning study to assess the condition of assets in RO system and the recommissioning MF system in order to make it operable, if Carlsad desires this to meet recycled water quality and supply goals. The MF is still a component of the existing permit, even though hasn’t been operated recently.

The MF rehabilitation project is dependent upon the outcome of the facility-level assessment that includes a study on the feasibility of RO, MF and UF processes to identify alternatives. The condition of MF and RO is unknown as they have not been operating for a long time and recommissioning may not be technically or economically viable. A study can confirm which action can be more beneficial.

This study assists to determine whether it is a need to bring the MF back online and to identify the most feasible and best economical approach to meet Carlsbad recycle water quality and supply goals.
05/13/2025 C9 886 of 1078
FY2023 R-CAMP Report
4-6
S/P-9.5.010 Granular Media Filters (GMF) Bypass
In 2016, the Master Recycling Permit was upda ted by the California Reginal Water Quality Control Board to reflect proce ss changes that occurred at th e conclusion of CWRF Phase III expansion. With the updated permit, CWRF was issued updated compliance standards. CWRF is required by permit to produce recycled water below a maximum turbidity level for each treatment train, as measured at the effluent of each treatment train. Prior to the Permit update, CWRF effluent turbidity was measured only at the end of the Chlorine Contact Tank (CCT). The updated Permit requires turbidity compliance points to be located immediately downstream of each treatment train, which can be problematic for the GMF. Upon Plant startup, system startup and other nonstandard operating conditions, GMF effluent may temporarily exceed the maximum allowable turbidity limit, causing the water to be considered “off -spec” and non -compliant. The GMF does not currently have an off-spec drain back to EWPCF.

During current “off-spec” events, the GMF effluent still has to flow through the CCT prior to being diverted to the EWPCF, thereby making any othe r water in the CCT also non-compliant. This requires the CCT to be drained prior to restarting the production of compliant recycled water which can take up to six hours.

This study has been identified in 2021 R-CAMP. This study will evaluate installing a new off-spec pipeline from the GMF effluent to bypass the CCT and return directly to the EWPCF or other options to mitigate turbidity spikes such as relocating or averaging turbidimeters or requesting permit modification for more variations during startup period.

EWA staff suggested the GMF effluent that is bypassed should be routed back to EWPCF via the existing junction box near the SEEPS generator. This project should include upsizing the junction box to take the full flow of CWRF; therefore, allowing subsequent programing modification to allow for CWRF "failsafe" interlock.

S/P-9.5.014 Access between CWRF and CPS
During the
October 2021 condition assessment, EWA staff noted that there is a need for footpath between CWRF and Combined Pump Station (CPS) for routine maintenance of the CWRFs’ assets that are located at the CPS. Due to elevation difference between CWRF and CPS and lack of proper access between these two facilities, there are sa fety concerns for opera tional staff to perform routine maintenance on the assets owned by CWRF and located at CPS. This study will evaluate the alternative options for improving access between CWRF and CPS.

S/P-9.5.015 Clean-In-Place Chemical Optimization
(Formerly was EWA’s project (S-38002-004), transferred to Owner’sproject) This is related to 2021 R-CAMP study S-38002-004. The operations staff noted that the sodium bisulfite and citric acid storage tanks are re filled every couple of weeks. During commissioning and performance testing of the ultrafiltration sy stem (UF) in 2016-2017, chemical use was increased above the intended design dosing to successfully pass the test to sufficiently recover the 05/13/2025 C9 887 of 1078
FY2023 R-CAMP Report
4-7
transmembrane pressure. EWA staff have tried to optimize the chemical dosing, but the dosing is still more than the original design parameters, so chemical deliveries are required more frequently than the design intent.

This study will evaluate the optimal size of the chemical storage tanks to minimize the frequency of deliveries and assess other chemical system optimization, such as containment. This study may also review sodium hypochlorite storage requirements. Optimization of the storage tanks sizes may provide long-term cost savings through minimizing th e frequency of chemical deliveries, as well as additional facility resiliency in regard to spill risk/ exposure mitigation during chemical deliveries, protection from chemi cal supply chain and driver short ages, and ability to resource share if needed with EWPCF or other agencies.

S/P-9.5.016 Facility Level Assessment
With upcoming increase in the CMWD’s recycle water demand, the Owner plans to leverage the potential existing components and assets in the CW RF to meet their recycled water quality and supply goals. A whole facility level assessment is recommended to align objectives and establish road map.

For this purpose, evaluating the installation of a new off-spec pipeline from the GMF effluent to bypass the CCT and return directly to the EWPCF needs to be investigated. In addition, there is a need to assess whether the recommission of MF and RO or expansion of UF system is more technically and economically feasible.

The UF can produce higher quality water than the GMF and was installed to treat a greater variety of supply water. The UF can treat up to approximately 20 Nephelometric Turbidity Unit (NTU) in comparison with the GMF which can treat 2 to 3 NTU. Unlike the UF filters, that provide an absolute barrier, the GMF media allows for pa ssthrough of some feed water constituents. As a result, operating the UF more frequently would result in higher quality water but reduced flow capacity and increased chemical, electrical, and mechanical costs. The Owners plan to evaluate the installation of strainer at GMF feed pumps as an alternate engineered solution to increase GMF effluent water quality and resiliency.

During the condition assessment in
October 2021, adding isolation valves to each individual UF module was identified to help isolate each module as needed. In addition, EWA staff noted that adding a sluice gate to north side CCT would al low isolation of each basin for as needed maintenance.

This study will assess the installation of a new off-spec pipeline, feasibility of MF, RO and UF to identify alternatives, installation of strainer at GMF feed pumps, installation of isolation valves for UF modules, and adding a sluice gate to the north side of CCT.

In addition, any proposed major equipment replacement and rehabilitation in P-9.5.013 project and considered as owners’ items for recycled water pump station is recommended to be evaluated through a study by Owners (e.g., strainer, conduit issues from ground settling, etc.). 05/13/2025 C9 888 of 1078
FY2023 R-CAMP Report
5-1

5. IDENTIFICATION OF PROJECTS
This section provides an organized reference for R-CAMP projects that are recommended for funding in the next six years and beyond. Since the remote facilities are owned by the Owners and are operated and maintained by EWA, the projec ts discussed within this section were collaboratively assigned to th e EWA or Owners, with EWA genera lly taking responsibility for smaller maintenance projects and Owners generall y incorporating for the larger capital projects into their own CIPs for that facility. There may be exceptions for efforts that may be better suited for a specific lead agency.

Project descriptions for potential projects that have been identified include a project background, description, justification/consequences, a nd/or project delivery method. The project delivery methods considered in the R-CAMP include traditional in-house services, contracted services, and design-bid-build (DBB) as well as alternati ve delivery methods including design-build (DB), design-build-operate (DBO), design-build-own-operate (DBOO), etc.

R-CAMP projects were developed based on completed condition assessments and facility needs assessments, asset age, other reports, or EWA staff observations since the preparation of the previous R-CAMP. Some staff observations result in a project with design criteria in which EWA and Owners reach consensus during the R-CAMP process, and these projects are added to the list.

These projects typically include a design phase prior to the project implementation phase. Other observations require a special study to address an issue or concern that is identified, which will identify a specific R-CAMP project later.

Through discussions between EWA and Owners, project responsibility is assigned to either EWA or Owners for each project.

Table 5-1 through
05/13/2025 C9 889 of 1078
FY2023 R-CAMP Report
5-2
Table 5-5 provide a breakdown of project assignment for projects in this R-CAMP by facility. 05/13/2025 C9 890 of 1078
FY2023 R-CAMP Report
5-3
Table 5-1: BCPS Project Responsibility Designation
Project Number Project Name EWA Owners
Buena Creek Pump Station
P – 37002-001 Minor EI&C Rehabilitation X
P – 37002-002 Minor Mechanical
Rehabilitation X
P – 37002-003 Minor Structural Rehabilitation X
P – 37002-004 SCADA Migration X
P – 37002-005 Site Safety Improvements X
P – 37002-006 Structural Improvements X
P – 37002-Recurring Grinder Rebuild X
P – 37002-Recurring Sewage Pump Rebuild X
P – 37002-Recurring Sewage Pump Motor Rebuild X
P – 37002-Recurring Integration Assistance X
P – 37002-Recurring Unplanned Minor
Rehabilitation
X
P – 37002-Recurring Coatings and Paintings X
P – 37002-Recurring VFD Repairs X
ES – 37002-Recurring R-CAMP Update X
P – 9.4.004 Major Equipment CIP X
P – 9.4.005 Scum and FOG Abatement X
P – 9.4.006 Site Security Improvements X
P – 9.4.007 Civil Improvement X
S/P – 9.4.008 Bypass Study X
P – 9.4.009
Mechanical Modifications
(formerly Modify Discharge
Valve Installation)
X
P – 9.4-Recurring Landscaping X
05/13/2025 C9 891 of 1078
FY2023 R-CAMP Report
5-4
Table 5-2: RBPS Project Responsibility Designation
Project Number Project Name EWA Owners
Raceway Basin Pump Station
P – 39002-001 Minor EI&C Rehabilitation X
P – 39002-002 Minor Mechanical
Rehabilitation X
P – 39002-003 Minor Structural Rehabilitation X
P – 39002-004 SCADA Migration X
P – 39002-005 Site Safety Improvements X
P – 39002-Recurring Grinder Rebuild X
P – 39002-Recurring Sewage Pump Rebuild X
P – 39002-Recurring Sewage Pump Motor Rebuild X
P – 39002-Recurring Integration Assistance X
P – 39002-Recurring Unplanned Minor Rehabilitation X
P – 39002-Recurring Coatings and Paintings X
P – 39002-Recurring VFD Repairs X
ES – 39002-Recurring R-CAMP Update X
S/P – 9.1.006 Containment Basin Repair X
P – 9.1.008 Major Equipment CIP X
S/P – 9.1.009 Pump Station Resiliency X
P – 9.1.010 Scum and FOG Abatement X
P – 9.1.011 Site Security Improvements X
P – 9.1-Recurring Landscaping X
05/13/2025 C9 892 of 1078
FY2023 R-CAMP Report
5-5
Table 5-3: BVPS Project Responsibility Designation
Project Number Project Name EWA Owners
Buena Vista Pump Station
P – 32002-001 Minor EI&C Rehabilitation X
P – 32002-002
Minor Mechanical
Rehabilitation X
P – 32002-003 Minor Structural Rehabilitation X
P – 32002-004 SCADA Migration X
P – 32002-005 Site Safety Improvements X
P – 32002-006 Structural Improvement X
P – 32002-Recurring Grinder Rebuild X
P – 32002-Recurring Sewage Pump Rebuild X
P – 32002-Recurring Sewage Pump Motor Rebuild X
P – 32002-Recurring Integration Assistance X
P – 32002-Recurring Unplanned Minor Rehabilitation X
P – 32002-Recurring Coatings and Paintings X
P – 32002-Recurring VFD Repairs X
ES – 32002-Recurring R-CAMP Update X
S/P – 9.3.008 Major Equipment CIP X
P – 9.3.009 Site Security Improvement X
S/P – 9.3.010
Facility-Level Alternative
Analysis (formerly known as
Relocation Study)
X
P – 9.3-Recurring Landscaping X
05/13/2025 C9 893 of 1078
FY2023 R-CAMP Report
5-6
Table 5-4: AHLS Project Responsibility Designation
Project Number Project Name EWA Owners
Agua Hedionda Lift Station
P – 31002-1 Minor EI&C Rehabilitation X
P – 31002-2 Minor Mechanical Rehabilitation X
P – 31002-3 Minor Structural Rehabilitation X
P – 31002-4 SCADA Migration X
P – 31002-5 Site Safety Improvements X
P – 31002-6 Replace Spare Grinder X
P – 31002-Recurring Grinder Rebuild X
P – 31002-Recurring Integration Assistance X
P – 31002-Recurring Unplanned Minor Rehabilitation X
P – 31002-Recurring Pump and Motor Rebuild X
P – 31002-Recurring VFD Repairs X
P – 31002-Recurring Coatings and Paintings X
ES – 31002-Recurring R-CAMP Update X
S – 9.2.001 Incompatible Metals X
P – 9.2.002 Pump Station D/B Improvement X
P – 9.2-Recurring Landscaping X
05/13/2025 C9 894 of 1078
FY2023 R-CAMP Report
5-7
Table 5-5: CWRF Project Responsibility Designation
Project Number Project Name EWA Owners
Carlsbad Water Recycling Facility
P – 38002-005 Minor Structural Rehabilitation X
P – 38002-008 Miscellaneous Service Requests X
P – 38002-010 Minor EI&C Rehabilitation X
P – 38002-011 Minor Mechanical Rehabilitation X
P – 38002-012 Site Safety Improvements X
P – 38002-Recurring Coatings and Paintings X
P – 38002-Recurring Unplanned Minor Rehabilitation X
P – 38002-Recurring Integration Assistance X
P – 38002-Recurring VFD Repairs X
P – 38002-Recurring GMF Sand X
ES – 38002-000 R-CAMP Update X
P – 9.5.005 Equalization Basin Water Quality X
S/P – 9.5.008 RO Rehabilitation X
S/P – 9.5.009 MF Rehabilitation X
S/P – 9.5.010 GMF Bypass X
S/P – 9.5.015
Clean-In-Place Chemical
Optimization X
P – 9.5.012 Operations and Administration
Building Roof and HVAC X
P – 9.5.013 Major Equipment CIP X
S/P – 9.5.013 Facility Level Assessment X
S/P – 9.5.014 Access between CWRF and CPS X
P – 9.2-Recurring Landscaping X
As projects are funded or completed, the project de scriptions are removed from this section and the projects are listed by year implemented in Appendix A, which provides a list of projects completed since 2009. Projects may be removed from consideration for other reasons; for example, a project may be combined with a different project, or a project may not meet cost/benefit requirements and therefore be eliminated from consideration.

In order to facilitate maintenance activities at th e remote facilities, EWA maintains a spare parts inventory that are critical to the operation of the fa cilities. Lists of the spare parts inventory is provided in Appendix D.
05/13/2025 C9 895 of 1078
FY2023 R-CAMP Report
5-8

5.1. BUENA CREEK PUMP STATION PROJECTS

5.1.1. EWA Projects
P-37002-001 Minor EI&C Rehabilitation
Background
During May 2021 condition assessment and October 2021 site assessment, several locations of potential electrical and instrumentational deficiencies were noted throughout BCPS. The deficiencies were indicative of wear due to age and include recommended improvements for additional control redundancy and improved safety through testing plans and additional equipment monitoring.

Description
Perform minor EI&C maintenance throughout BCPS, including:
x Integrate On-net Surveillance Systems (onSSI), Inc. to the remote cameras x Instrumentation access: Add a hand access hole with new transducer for access to wet well level transducers without entering the wet well. Relocate level and flow transmitters outside of the PLC for greater accessibility or add a remote readout x Circuit organization: Known as wiring in previous R-CAMP x Panel protection: Replace misplaced ra ceway box covers, damaged conduit, and damaged fiberglass LCP
x Pressure transducer replacement: Replace 2 of the Pressure Transducers that deal with Levels. The current setup is bulky and can fault-out when rags get entangled on the sensor this can result in faulty inaccurate readings. Replace with a Vega Pressure transducer will help to eliminate these fau lty reading due to the sleek design that is capable of being put down a slotted holed stainless-steel tube, thus keeping rags out of the readings
x Camera improvements: Add one camera
Justification/Consequence
In-house services, with a few service items for the as-needed General Contractor.

Project Delivery
In-house services, with a few contractors service items.

P-37002-002 Minor Mechanical Rehabilitation
Background
During the May 2021 condition assessment and October 2021 site assessment, two locations for minor mechanical task were identified and no ted throughout BCPS. Tasks were associated with wear due to age or operational accessibility and recommended impro vements to encourage equipment longevity.
05/13/2025 C9 896 of 1078
FY2023 R-CAMP Report
5-9
Description
Perform minor mechanical maintenance throughout BCPS, including:
x Overflow basin access hatch replacement: Re place overflow storage lids and locking mechanisms
x Moving the working door: Move “working door” from the north side of the building to other side to allow full operation of door and scum pumping activities Justification/Consequence
Early maintenance of mechanical wear can prevent further degradation and increase site safety.

Project Delivery
In-house services.

P-37002-003 Minor Structural Rehabilitation
Background
During the May 2021 condition assessment and October 2021 site assessment, several locations of minor structural wear were identified and no ted throughout BCPS. The structural wear was indicative of typical concrete and sealing degradation and improvement of structural condition of BCPS.

Description
Perform minor structural maintenance throughout BCPS, including:
x Awning installation: Install an awning ove r the SDG&E and generator walkway and doors to protect equipment from rain intrusion
x Platform installation: Platform to read H2S concentration at the odor scrubber exhaust x Drain installation: During rain events, wate r comes down the slope next to the stairs and comes into the building, sandbags are used to deflect water away from the doorway.

The recommendation is to install a French dra in, rip rap as needed, and adjust size of curbing as needed next to stairs to prevent water intrusion into building during heavy rain events.
x Roof sealing: Roof is leaking
x Stair installation: Install stairs up to the SDG&E cabinet from the lower level Justification/Consequence
Early maintenance of structural wear can prevent further degradation and increase site safety.

Project Delivery
In-house services.
05/13/2025 C9 897 of 1078
FY2023 R-CAMP Report
5-10
P-37002-004 SCADA Migration
Background
EWPCF is migrating to a new supervisory cont rol and data acquisition (SCADA) platform, and each of the remote facilities will also need to migrate to the new SCADA system for improved control and monitoring.

Description
Perform SCADA migration system for BCPS, including:
x Migrate process control screens to the new SCADA system x Programming for pump alarms
x Keep pump from running when CV fails to open after operator selected elapsed time x Generator “Not in Auto”
x Overflow basin on level control
Justification/Consequence
Improved control and monitoring.

Project Delivery
EWA’s Programmatic SCADA Integrator.

P-37002-005 Site Safety Improvement
Background
During the May 2021 condition assessment and October 2021 site assessment, items and locations where safety can be improved were identified and noted throughout BCPS.

Description
Improve site safety tasks for BCPS, including:
x Overflow basin handrail improvement
x Install forced air ventilation & exhaust
x Install traffic mirror at easement road blind corners x Install engineered manhole cover
x Install motion sensor lighting inside building
Justification/Consequence
Increased site safety and regulatory conformance.

Project Delivery
In-house services, and as-needed Contractor Services.
05/13/2025 C9 898 of 1078
FY2023 R-CAMP Report
5-11
P-37002-006 Structural Improvement
Background
During the May 2021 condition assessment and October 2021 site assessment, locations of potential structural deficiencies throughout BCPS were identified and noted. The deficiencies were associated with concrete deterioration requiring concrete repair.

Description
Perform structural repairs throughout BCPS, including:
x Seal locations of concrete seeping
Justification/Consequence
Early repair of structural deficiencies can prevent further deterioration and increase site safety.

Project Delivery
In-house services, and as-needed Contractor Services.

P-37002-Recurring Grinder Rebuild
Background
The facility grinders require regular maintenance. This project addresses required maintenance and associated grinder rebuilds.

Description
Conduct required maintenance and associated grinder rebuilds.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-37002-Recurring Sewage Pump Rebuild
Background
The sewage pumps require regular maintenance. This project addresses required maintenance and associated pump rebuilds.

Description
Conduct required maintenance and associated pump rebuilds.

Justification/Consequence
05/13/2025 C9 899 of 1078
FY2023 R-CAMP Report
5-12
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-37002-Recurring Sewage Pump Motor Rebuild
Background
The sewage pump motors require regular maintenance. This project addresses required maintenance and associated pump motor rebuilds.

Description
Conduct required maintenance and associated pump motor rebuilds.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-37002-Recurring Integration Assistance
Background
This project grants provisions for the integration of facility systems.

Description
Complete system integration as required.

Justification/Consequence
Programmatic SCADA Integrator Services.

Project Delivery
In-house services.

P-37002-Recurring Unplanned Minor Rehabilitation
Background
The facilities require various types of mainten ance and minor improvements as equipment and systems age. This project enables EWA staff to provide maintenance and repair services for unforeseen items at all remote facilities.

Description
05/13/2025 C9 900 of 1078
FY2023 R-CAMP Report
5-13
Conduct maintenance as required.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-37002-Recurring Coatings and Paintings
Background
This project addresses required painting and coating noted through condition assessments or staff observation.

Description
Painting and coating of the facility.

Justification/Consequence
Painting and coating equipment provides protection and increases the reliability of the equipment.

Project Delivery
In-house services, or EWA’s As Needed Coatings Contractor.

P-37002-Recurring VFD Repairs
Background
The VFDs require regular maintenance. This project addresses required maintenance and VFD repairs.

Description
Conduct required maintenance and associated VFD repairs.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.
05/13/2025 C9 901 of 1078
FY2023 R-CAMP Report
5-14
ES-37002-Recurring R-CAMP Update
Background
The plan is to update the R-CAMP report for all remote facilities bi-annually. This project helps track the status of projects associated with BCPS.

Description
Develop report for the projects associated with BCPS.

Justification/Consequence
R-CAMP report increases reliability and mitigates the risk for the facility.

Project Delivery
RFP-Contract.

5.1.2. Owners Projects
P-9.4.004 Major Equipment CIP
Background
During the May 2021 condition assessment and October 2021 site assessment, large facility component replacements or repairs required within the next 3-5 years were identified and noted.

These repairs should be coordinated with future master plans or other Owners efforts and routinely reassessed. Results of studies noted within this R-CAMP should be considered for incorporation into this or other projects in the next R-CAMP cycle.

Description
BCPS can be improved via the following projects:
x HVAC: Installation of HVAC, roof supply and exhaust fans/AC for the MCC room x Additional forced air ventilation installation
x Replacement of aging equipment, such as:
o Switchboard: Distribution switchboard –1200Amp/480V
o Flowmeters (8-inch & 14-inch)
x Automation of valves, such as:
o Valves to and from the Buena Yard facility
o Dry well flood suction valves
x Replacement of the roof due to age: Modified Bitumen Roofing with Insulation x Install bypass pump system: Make maintenance and repairs on plant more cost effective x Isolation gate: East/ West wet well isolation gate is seized and in need of repair. Wet well isolation gate should be upsized
x Fire hydrant installation: Add fire hydrant ne ar station. Maintain consistency with NFPA requirements. No fire hydrant nearby. For full automation, consider remotely controlled rooftop fire suppression system instead of alarms that go off in case of fire 05/13/2025 C9 902 of 1078
FY2023 R-CAMP Report
5-15
Justification/Consequence
Replacement of aged equipment will encourage station reliabilit y and increase site safety.

Additional improvements will enhance facility robustness.

Project Delivery
RFP-Contract.

P-9.4.005 Scum and FOG Abatement
Background
Historically, BCPS has been experiencing consistent and significant levels of FOG buildup in the wet well and rags clogging pumps. A study was performed in 2021 to provide an alternative analysis of Scum and FOG mitigation technologies for the BCPS.

Description
According to the result of study performed, PHi technology was recommended as the best option for the Scum and FOG mitigation at BCPS. F urther detail about the methods and criteria implemented for selecting PHi technology can be found in Fats, Oils, and Grease Mitigation Recommendation Technical Memorandum dated July 2021.

Justification/Consequence
Implementing proper technology for mitigating FOG and ragging abetment improve performance of pumps, the pipes and instrumentation, and avoid potential overflow of sewage spill.

Project Delivery
RFP-Contract.

P-9.4.006 Site Security Improvements
Background
During the May 2021 condition assessment and October 2021 site assessment, locations where security can be improved were identified and noted.

Description
BCPS security can be improved via the following projects:
x Perimeter fencing: Demolish existing fence and replace with Candy Cane style fence as allowed by applicable city aesthetic requirements
x Remote control gate installation
Justification/Consequence
Increased site security to minimize trespassing and promote safe accessibility. 05/13/2025 C9 903 of 1078
FY2023 R-CAMP Report
5-16
Project Delivery
RFP-Contract.

P-9.4.007 Civil Improvements
Background
During the May 2021 condition assessment and October 2021 site assessment, locations where civil components can be improved were identified and noted.

Description
BCPS site-civil conditions can be improved via the following projects:
x Repair pave and light vehicle pathway: Pave or otherwise improve vehicle pathway from Melrose gate to pump station. Motion activated street lighting should be considered.

Project could be done in conjunction with parks department to add a bike/walking path x Guardrail installation: Install a guardrail around storm drain on easement road to pump station from Jif Pak
x Drainage improvements
Justification/Consequence
Improved site accessibility and mitigate risk due to natural and human-made hazards.

Project Delivery
RFP-Contract.

P – 9.4.008 Bypass
This project has currently been identified as a study. Information on this study can be found in Section 4 (S/P-9.4.008).

P-9.4.009 Mechanical Modifications (formerly Mo dify Discharge Valve Installation) Background
The Buena Creek pump discharge piping is configured with 8-inch and 12-inch piping and valves, to allow for pump isolation and varied operating modes. Six of the plug valves are configured such that under normal or primary modes of operation, the seating side of the valve is facing the unpressurized side of the system. Duri ng the May 2021 condition assessment and October 2021 site assessment, valves that need to be replaced have been identified and noted.

Description
Modification of the valves can be performed via the following projects:
x Replacement of Discharge Valves: Replacement of all the discharge valves x Remove six plug valves and reinstall with seating side of valve facing pressurized side of system
05/13/2025 C9 904 of 1078
FY2023 R-CAMP Report
5-17
x Replacement of Suction Valves: Replacement of all the suction valves x Project assumes plant bypass concurrent with Scum/Fog abatement project and therefore, only one bypass event is required. It is also assumed the bypass service will be rented for 20 days. It is worth mentioning that if these two projects are planned to be done separately, cost associated with one a dditional bypass event should be added to Scum and FOG Abatement project.

Justification/Consequence
Installation of new valves increases the reliability of the remote facility. Modification would be consistent with manufacturer’s recommendations. In addition, there are a number of suction valves that are leaking.

Project Delivery
RFP-Contract.

P-9.4.Recurring Landscaping
Background
The landscaping design is intended to prevent the spread of wildfire, not attract vectors, and improve aesthetics.

Description
x Routine landscaping
x Maintain landscape to protect water meter access
x Fire prevention
x Melrose driveway
Justification/Consequence
Remove landscaping within the station fence line will prevent the spread of wildfire and vectors and improve aesthetics and increases site safety.

Project Delivery
RFP-Contract.

5.2. RACEWAY BASIN PUMP STATION PROJECTS

5.2.1. EWA Projects
P-39002-001 Minor EI&C Rehabilitation
Background
During the May 2021 condition assessment and October 2021 site assessment, several locations of potential electrical and instrumentational deficiencies were noted throughout RBPS. The 05/13/2025 C9 905 of 1078
FY2023 R-CAMP Report
5-18
deficiencies were indicative of wear due to age and include recommended improvements for additional control redundancy and improved safety through testing plans and additional equipment monitoring.

Description
Perform minor EI&C maintenance throughout RBPS, including:
x Grinder level control: Put overflow grinder on level control to auto-start x Conduit safety improvements: Replace all above-grade raceways with PVC-coated RGS conduit with conduit seals when exiting classified locations x Pullbox replacement: Replace degraded pullboxes
x Wiring organization
x Level indicators: Ultrasonic level sensor, wet well level indicating transmitter, and pressure transducer
Justification/Consequence
Early maintenance of EI&C wear can prevent further degradation and increase site safety.

Project Delivery
In-house services, and as-needed Contractor Services.

P-39002-002 Minor Mechanical Rehabilitation
Background
During the May 2021 condition assessment and October 2021 site assessment, some minor mechanical tasks were identified and noted throu ghout RBPS. Tasks were associated with wear due to age or operational accessibility and reco mmended improvements to encourage equipment longevity and the station performance.

Description
Perform minor mechanical maintenance throughout RBPS, including:
x Plug valves replacement: Plug valves are backwards
x Air/Vac valve drain routing: Connecting the si te drain piping to the wet well. The recommendation is to repipe the site drain pipe that is currently connected to the basin to go into the wet well
x Flap gate replacement: Modify main station entry gate, and improve to open automatically with remote
Justification/Consequence
Early maintenance of mechanical wear can prevent further degradation and increase site safety.

Project Delivery
In-house services.
05/13/2025 C9 906 of 1078
FY2023 R-CAMP Report
5-19
P-39002-003 Minor Structural Rehabilitation
Background
During the May 2021 condition assessment and October 2021 site assessment, three locations of minor structural wear were identified and noted at RBPS. The structural wear was indicative of typical concrete and sealing degradation and improvement of structural condition of RBPS.

Description
Perform minor structural maintenance throughout RBPS, including:
x Curb striping: Stripe curb around Containment Basin
x Barrier wall to protect SDG&E cabinets from potential flooding situation from nearby creek
x Joint filler: Replace joint filler between door and landing on east face of building Justification/Consequence
Early maintenance of structural wear can prevent further degradation and increase site safety.

Project Delivery
In-house services.

P-39002-004 SCADA Migration
Background
EWPCF is migrating to a new supervisory cont rol and data acquisition (SCADA) platform, and each of the remote facilities will also need to migrate to the new SCADA system for improved control and monitoring.

Description
Perform SCADA migration system for RBPS, including:
x Migrate process control screens to the new SCADA system x Generator “Not in Auto”
Justification/Consequence
Improved control and monitoring.

Project Delivery
EWA’s Programmatic SCADA Integrator.

P-39002-005 Site Safety Improvement
Background
05/13/2025 C9 907 of 1078
FY2023 R-CAMP Report
5-20
During the May 2021 condition assessment and October 2021 site assessment, items and locations where safety can be improved were identified and noted throughout RBPS.

Description
Improve site safety tasks for RBPS, including:
x Lockout devices: Purchase lockout devices (a pplication specific) in sufficient quantity to lock out wheel valves and ball valves throughout facility x Camera toward basin: There is currently no ca mera view towards the basin. This item would include the addition of a camera with a view towards the basin Justification/Consequence
Increased site safety and regulatory conformance.

Project Delivery
In-house services, and as-needed Contractor Services.

P-39002-Recurring Grinder Rebuild
Background
The facility grinders require regular maintenance. This project addresses required maintenance and associated grinder rebuilds.

Description
Conduct required maintenance and associated grinder rebuilds.

Justification/Consequence
Maintenance increases reliability of the equipment.

Project Delivery
In-house services.

P-39002-Recurring Sewage Pump Rebuild
Background
The sewage pumps require regular maintenance. This project addresses required maintenance and associated pump rebuilds.

Description
Conduct required maintenance and associated pump rebuilds.

Justification/Consequence
Maintenance increases reliability of the equipment.
05/13/2025 C9 908 of 1078
FY2023 R-CAMP Report
5-21
Project Delivery
In-house services.

P-39002-Recurring Sewage Pump Motor Rebuild
Background
The sewage pump motors require regular maintenance. This project addresses required maintenance and associated pump motor rebuilds.

Description
Conduct required maintenance and associated pump motor rebuilds.

Justification/Consequence
Maintenance increases reliability of the equipment.

Project Delivery
In-house services.

P-39002-Recurring Integration Assistance
Background
This project addresses the integration of facility systems.

Description
Complete system integration as required.

Justification/Consequence
Programmatic SCADA Integrator Services.

Project Delivery
In-house services.

P-39002-Recurring Unplanned Minor Rehabilitation
Background
The facilities require various types of mainten ance and minor improvements as they age. This project enables EWA staff to provide maintenances and repair services for unforeseen items at all remote facilities.

Description
Conduct maintenance as required.
05/13/2025 C9 909 of 1078
FY2023 R-CAMP Report
5-22
Justification/Consequence
Maintenance increases reliability of the equipment.

Project Delivery
In-house services.

P-39002-Recurring Coatings and Paintings
Background
This project addresses required painting and coating noted through condition assessments or staff observation.

Description
Painting and coating of the facility.

Justification/Consequence
Painting and coating equipment provides protection and increases the reliability of the equipment.

Project Delivery
As-Needed Coating Contractor.

P-39002-Recurring VFD Repairs
Background
The VFDs require regular maintenance. This project addresses required maintenance and VFD repairs.

Description
Conduct required maintenance and associated VFD repairs.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

ES-39002-Recurring R-CAMP Update
Background
The plan is to update the R-CAMP report for all remote facilities bi-annually. This project helps tracking the status of projects associated with RBPS.
05/13/2025 C9 910 of 1078
FY2023 R-CAMP Report
5-23
Description
Develop report for the projects associated with RBPS.

Justification/Consequence
R-CAMP report increases reliability and mitigates the risk for the facility.

Project Delivery
RFP-Contract.

5.2.2. Owners Projects
P-9.1.006 Containment Basin Repair
This project has currently been identified as a study. Information about this study can be found in Section 4 (S-9.1.006). This project was noted in the R-CAMP 2014 as P-9.1.001, which has been moved to historic projects.

P-9.1.008 Major Equipment CIP
Background
During the May 2021 condition assessment and October 2021 site assessment, large facility component replacements or repairs required within the next 3-5 years were identified and noted.

These repairs should be coordinated with future master plans or other Owners efforts and routinely reassessed. Results of studies noted within this R-CAMP should be considered for incorporation into this or other projects in the next R-CAMP cycle.

Description
RBPS can be improved via the following projects:
x HVAC – AC for Electrical Room: Installation of air conditioning in the MCC room x Valve Replacement – Pump Check valves and Isolation Valves: Replacement of all check valves aged 20 years and all manual valves aged 25-30 years x Valve Automation: Automation of the containment basin drain valve Justification/Consequence
Replacement of aged equipment will improve station reliability and increase site safety. Additional improvements will enhance facility robustness.

Project Delivery
RFP-Contract.
05/13/2025 C9 911 of 1078
FY2023 R-CAMP Report
5-24
P-9.1.009 Pump Station Resiliency
This project has currently been identified as a study. Information about this study can be found in Section 4 (S-9.1.009).

P-9.1.010 Scum and FOG Abatement
Background
Historically, RBPS has experienced consistent and significant levels of FOG buildup in the wet well. A study performed in 2021 to provide an alte rnative analysis of Scum and FOG mitigation technologies for the RBPS.

Description
According to the result of study, PHi technology was recommended as the best option for the Scum and FOG mitigation at RBPS. Further details a bout the methods and criteria implemented for selecting PHi technology can be found in Fats, O ils, and Grease Miti gation Recommendation Technical Memorandum dated July 2021.

Justification/Consequence
Implementing proper technology for mitigating FOG and ragging abetment improve performance of pumps, the pipes and instrumentation, and avoid potential overflow of sewage spill.

Project Delivery
RFP-Contract.

P-9.1.011 Site Security Imrpovement
Background
During the May 2021 condition assessment and October 2021 site assessment, locations where security can be improved were identified and noted.

Description
RBPS security can be improved via the following projects:
x Entry gate replacement: Modify main station entry gate to open automatically with remote sensing
x Lighting improvement: Install motion sensor li ghting inside MCC room, and install lighting toward basin
x So. Melrose Dr. access road paving: Repair the access road and site area pavement x Fence replacement: Demolish existing Perimeter fence and replace with Candy Cane style fence as allowed by applicable city aesthetic requirements. This project is related to the 2014 R-CAMP project P-9.1.003
Justification/Consequence
05/13/2025 C9 912 of 1078
FY2023 R-CAMP Report
5-25
Increased site security to minimize trespassing and promote safe accessibility.

Project Delivery
RFP-Contract.

P-9.1.Recurring Landscaping
Background
The landscaping improvements can prevent the spre ad of wildfire, reduce vectors, and improve aesthetics.

Description
x Routine landscaping
x Maintain fire break
x Melrose driveway
Justification/Consequence
Remove landscaping within the station fence line w ill prevent the spread of wildfire and vectors and improve aesthetics and increases site safety.

Project Delivery
RFP-Contract.

5.3. BUENA VISTA PUMP STATION PROJECTS

5.3.1. EWA Projects
P-32002-001 Minor EI&C Rehabilitation
Background
During the May 2021 condition assessment and October 2021 site assessment, several locations of potential electrical and instrumentation and control deficiencies were noted throughout BVPS. The deficiencies were indicative of wear due to age and the assessment includes recommended improvements for additional control redundancy and improved safety through testing plans and additional equipment monitoring.

Description
Perform minor EI&C maintenance throughout BVPS, including:
x Conduit replacement: Replace deteriorated conduits within the wet well, replace exposed conduits
x Lighting replacement: Replace wet well lights and pump station incandescent lighting with light emitting diode (LED) fixtures
05/13/2025 C9 913 of 1078
FY2023 R-CAMP Report
5-26
x Level indicator and switch installation: Level indicators for the two tanks located outside. They can repurpose the signal wire but still need 120-volt rewiring. This applies to both tanks.
x Sensor installation: The grinder had leaks to the hydraulic system and failed. It needs a sensor to identify when it stops operating. Add a zero-speed sensor to the grinder so that if the grinder does not operate as expected when called to run then an alarm will be sent to SCADA. In additi on, EWA plans to replace hydraulic unit with electric in FY23. The new grinder should be installed with a zero-speed sensor as well. x Transmitter replacement: Replace grinder/bar screen bubbler with an ultrasonic level transmitter (was originally part of historic project P-9.3.002). Pumps 1 and 2 pressure transmitters.
x Control panel improvement: Control panel has uncovered opening, likely from removed pilot device/light. Bunker control panels are maintenance intensive, Encina prefers ultrasonic or radar level detection, due to improvements in technology this also applies to the wet well bubbler panel
Justification/Consequence
Early maintenance of EI&C wear can prevent further degradation and increase site safety.

Project Delivery
In-house services, and as-needed Contractor Services.

P-32002-002 Minor Mechanical Rehabilitation
Background
During the May 2021 condition assessment and October 2021 site assessment, a number of minor mechanical tasks were identified and noted throughout BVPS. Tasks were associated with wear due to age or operational accessibility. The assessment recommended improvements to encourage equipment longevity and the remote station performance.

Description
Perform minor mechanical maintenance throughout BVPS, including:
x Spray system pipeline repair or replacement
x Minor valve replacement: Replace solenoid valves
x Replace fan assembly: There are signs of corrosion on the fan circulating in Motor Room. Replace the fan
x Valve replacement/modification: Sewage pump discharge valves are overhead and difficult to reach, modify valve with ch ain or motor operated valve. Automation/ remote operation of force main valves from HMI. Converting manual valve to chain operated valves
Justification/Consequence
Early maintenance of mechanical wear can prevent further degradation and increase site safety. 05/13/2025 C9 914 of 1078
FY2023 R-CAMP Report
5-27
Project Delivery
In-house services.

P-32002-003 Minor Structural Rehabilitation
Background
During the May 2021 condition assessment and October 2021 site assessment, several locations of minor structural wear were identified and no ted throughout BVPS. The structural wear was indicative of typical concrete and sealing degradation and improvement of structural condition of BVPS.

Description
Perform minor structural maintenance throughout BVPS, including:
x Concrete stain removal: Clean concrete wall s, floors, and equipment pads caused by groundwater intrusion and miscellaneous surface staining at different locations such as generator room, equipment pads and slabs, tank supports x Roof sealing: Repair pump station roof and reseal area around skylights in the MCC room
x Awning installation: Put a shade/ rain structure over the SDG&E cabinet to avoid water intrusion when door is open during wet weather
x Replace skylight hatch frame in the barrel roof
Justification/Consequence
Early maintenance of structural wear can prevent further degradation and increase site safety.

Project Delivery
In-house services, and as-needed Contractor Services.

P-32002-004 SCADA Migration
Background
EWPCF is migrating to a new supervisory cont rol and data acquisition (SCADA) platform, and each of the remote facilities will also need to migrate to the new SCADA system for improved control and monitoring.

Description
Perform SCADA migration system for BVPS, including:
x Migrate process control screens to the new SCADA system x Generator and not-in-auto alarm integration
x Zero-speed sensor
Justification/Consequence
05/13/2025 C9 915 of 1078
FY2023 R-CAMP Report
5-28
Improved control and monitoring.

Project Delivery
EWA’s Programmatic SCADA Integrator.

P-32002-005 Site Safety Improvement
Background
During the May 2021 condition assessment and October 2021 site assessment, items and locations where safety can be improved were identified and noted throughout BVPS.

Description
Improve site safety tasks for BVPS, including:
x Skylight safety grating: Install safety grati ng on the grinder skylight doors. The wet well skylight needs a solution for fall protection
x Lockout devices: Purchase lockout devices (appl ication specific) in sufficient quantity to lock out wheel valves and ball valves throughout facility x Ladder cage on roof: Add ladder cage on east ladder on barrel roof near the hydraulic room x Motion sensor lighting: Install motion sensor lighting for all rooms/ indoor areas x Improve fencing: Adding a second fence to try to contain entry into basin. Fencing needs to be improved to enhance the durability to prevent trespassing through fences and to avoid debris collection.

Justification/Consequence
Increased site safety and regulatory conformance.

Project Delivery
In-house services, and as-needed Contractor Services.

P-32002-006 Structural Improvements
Background
During the May 2021 condition assessment and October 2021 site assessment, one location with potential structural deficiency throughout BVPS was i dentified and noted. The deficiency was associated with concrete degradation.

Description
Perform structural repairs throughout BVPS, including:
x Seal locations of concrete seeping
Justification/Consequence
05/13/2025 C9 916 of 1078
FY2023 R-CAMP Report
5-29
Early repair of structural deficiencies can prevent further deterioration and increase site safety.

Project Delivery
In-house services, and as-needed Contractor Services.

P-32002-Recurring Grinder Rebuild
Background
The facility grinders require regular maintenance. This project addresses required maintenance and associated grinder rebuilds.

Description
Conduct required maintenance and associated grinder rebuilds.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-32002-Recurring Sewage Pump Rebuild
Background
The sewage pumps require regular maintenance. This project addresses required maintenance and associated pump rebuilds.

Description
Conduct required maintenance and associated pump rebuilds.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-32002-Recurring Sewage Pump Motor Rebuild
Background
The sewage pump motors require regular maintenance. This project addresses required maintenance and associated pump motor rebuilds.

Description
05/13/2025 C9 917 of 1078
FY2023 R-CAMP Report
5-30
Conduct required maintenance and associated pump motor rebuilds.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-32002-Recurring Integration Assistance
Background
This project addresses the integration of facility systems.

Description
Complete system integration as required.

Justification/Consequence
Programmatic SCADA Integrator Services.

Project Delivery
In-house services.

P-32002-Recurring Unplanned Minor Rehabilitation
Background
The facilities require various types of mainten ance and minor improvements as they age. This project enables EWA staff to provide maintenance and repair services for unforeseen items at all remote facilities.

Description
Conduct maintenance as required.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-32002-Recurring Coatings and Paintings
Background
05/13/2025 C9 918 of 1078
FY2023 R-CAMP Report
5-31
This project addresses required painting and coating noted through condition assessments or staff observation.

Description
Painting and coating of the facility.

Justification/Consequence
Painting and coating equipment provide protection and increases the reliability of the equipment.

Project Delivery
In-house services, or EWA’s As Needed Coating Contractor.

P-32002-Recurring VFD Repairs
Background
The VFDs require regular maintenance. This pro ject addresses required maintenance and VFD repairs.

Description
Conduct required maintenance and associated VFD repairs.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

ES-32002-Recurring R-CAMP Update
Background
The plan is to update the R-CAMP report for all remote facilities bi-annually. This project helps tracking the status of projects associated with BVPS.

Description
Develop report for the projects associated with BVPS.

Justification/Consequence
R-CAMP report increases reliability and mitigates the risk for the facility.

Project Delivery
RFP-Contract.
05/13/2025 C9 919 of 1078
FY2023 R-CAMP Report
5-32

5.3.2. Owners Projects
P-9.3.008 Major Equipment CIP
Background
This project is pending completion of st udy S/P-9.3.008. During the May 2021 condition assessment and October 2021 site assessment, large facility component replacements or repairs required within the next 3-5 years were identified and noted. These repairs should be coordinated with future master plans or other Owners efforts and routinely reassessed. Results of studies noted within this R-CAMP should be considered for incorporation into this or other projects in the next R-CAMP cycle. The final scope and priority of task s associated with Major Equipment CIP is determined by the Facility-Level Alternative Evaluation Study.

Description
BVPS can be improved via the following projects:
x Replacement of aging equipment, such as:
o Automatic Transfer Switch
o Motor Control Center
o Switchboard
x HVAC: Installation of air conditioning in the MCC room x Headworks gates and grinders: Development of a headworks bypass system, which may include in-line grinders or a grinder vault outside of the headworks. This potential project relates to Project P-9.3.001 from the 2014 R-CAMP
x Valves: Replace solenoid valve
x Grating
x Roofing: Replacement of the pump station roof due to water leakage above electrical equipment
x Replace 2” backflow device: Replace 2” backflow at duck pond x Evaluation of berm: Evaluate if the elevati on of the creek berm is enough to protect the station from a significant storm event similar or greater than the storm on April 10, 2020.

During that rain event water was at the top of the berm and broke upstream of the station, which caused flooding of Oceanside's Buena Vista pump station and freeway. If April 10, 2020 would have been a high tide, water would possibly have crested the berm into the station resulting in infiltration into the we t well and overcome the station's pumping capacity. Berm improvements have been co mpleted upstream of BVPS where the berm broke during that storm, so the concern is that the weak spot may be at our station Justification/Consequence
Replacement of aged equipment will improve station reliability and increase site safety. Additional improvements will enhance facility robustness.

Project Delivery
05/13/2025 C9 920 of 1078
FY2023 R-CAMP Report
5-33
RFP-Contract.

P-9.3.009 Site Security Improvements
Background
During the May 2021 condition assessment and October 2021 site assessment, a location where security can be improved was identified and noted.

Description
BVPS security can be improved via the following project:
x Access road improvement
Justification/Consequence
Increased site security to minimize trespassing and promote safe accessibility.

Project Delivery
RFP-Contract.

P-9.3.010 Buena Vista Pump Station Facilit-Level Alternative Analysis (Formerly known as Relocation Study)
This project has currently been identified as a study. Information on this study can be found in Section 4 (S-9.3.010). The analysis would help select an alternative or a phasing plan that considers cost, benefits, levels of service, and other future goals associated with the pump station.

Alternatives to consider include:
x Replace BVPS with a new pump station
x Keep the existing pump station and implement Major Equipment CIP x Phasing between implementing a major CIP and building a new pump station x Evaluation of generator system when consid ering a new station: Air Pollution Control District (APCD) requirements are becoming more stringent and internal combustion engine standards may impact emergency power run time. Investigating best available technology and ensure that new site has adequate capacity to endure an extended outage.

The study will need to assess project objecti ves, potential locations, regulatory strategy and permitting approach, timeline, and planning level costs. The results will need to be incorporated into the next cycle of R-CAMP and closely coordinated with othe r rehabilitation efforts, as the Owners may choose to run certain assets to failure leading up to a full station replacement, rather than investing in significant rehabilitation. Once decided what to do, circle back to Major Equipment CIP.

P-9.3.Recurring Landscaping
Background
05/13/2025 C9 921 of 1078
FY2023 R-CAMP Report
5-34
The landscaping design is intended to prevent the spread of wildfire, not attract vectors, and improve aesthetics.

Description
x Routine landscaping
x Remove eucalyptus tree
Justification/Consequence
Remove landscaping within the station fence line w ill prevent the spread of wildfire and vectors and improve aesthetics and increases site safety.

Project Delivery
RFP-Contract.

5.4. AGUA HEDIONDA LIFT STATION PROJECTS

5.4.1. EWA Projects
P-31002-001 Minor EI&C Rehabilitation
Background
During the October 2021 site assessment, several loca tions of potential electrical and instrumentation and controls deficiencies were noted throughout AHLS. The deficiencies were indicative of age. The assessment includes re commended improvements for additional control redundancy and improved safety through testing plans and additional equipment monitoring.

Description
Perform minor EI&C maintenance throughout AHLS, including:
x Grinder Supply fan LOR switch relocation: The grinder building supply fan LOR switch is located within a confined space, and the switch should be moved outside of the grinder building. It is difficult to enter the space to start the fan if the atmosphere is poor, but the fan must be on to make the atmosphere acceptable to enter x Install air flow monitoring equipment: Install inline air flow monitoring equipment into the Humidifier feed line to ensure that proper air balance is achieved (design flow is ≥ 8,300 scfm). In addition, inline air flow mete r needs installation of either a handheld airflow monitors or inline flowmeter.
x Site camera improvement: Site security needs to be improved. Camera system should be evaluated to ensure that there are no blind spots. Adding extra camera can help mitigating the potential risks for the station. Ca mera feed is now viewable at EWPCF control room; however, Camera feed is curr ently intermittent. EWA is awaiting the completion of secondary server room to enable full functionality. x Install camera in wet well with feed viewable onsite within the MCC for the purpose of evaluating wet well cleaning effectiveness without the need for additional staff to be 05/13/2025 C9 922 of 1078
FY2023 R-CAMP Report
5-35
onsite for a confined space entry. Camera s hould be mounted on East wet well room wall with field-of-view of the length of wet well floor and sluice gate. x Grinder control panel relocation: Grinder control panels must be protected from unauthorized use to prevent a sewage spil l. Moving the operations of grinders control panels on the roof of the inlet structure is suggested. x Generator improvement for redundancy: There is no redundancy in the system, and if the generator gets disconnected, it cannot be notified. Therefore, it is a need to allow for generator notify operators or an alarm fo r disconnect cabinet. The accessibility of the generator disconnect switch is very critical. If unauthorized individuals or operational staff accidentally ope ns generator disconnect pa nel, it can disconnect the generator. Generator fuel level is also not functioning. x Bubbler control improvement: No redunda ncy is on bubbler control. Currently, only the bubbler has programming with pump interlocks. The Program needs to be redundant to allow the ultrasonic controllers to have the same function as the bubbler.

In addition, only the online controller should have pump interlock programming active and should readily swap controller if the selected controller fails. x Installing flow meter bypass: No flow meter Bypass. Not part of DB. x Conduit improvement to avoid leakage: Light switches, the conduit leaks/ leaks through cabinets every time it rains it leaks.

Justification/Consequence
Early maintenance of EI&C wear can prevent further degradation and increase site safety.

Project Delivery
In-house services, and as-needed Contractor Services.

P-31002-002 Minor Mechanical Rehabilitation
Background
During the October 2021 site assessment, a number of minor mechanical tasks were identified and noted throughout AHLS. Tasks were associated with we ar due to age or operational accessibility and recommended improvements to encourage equipment longevity and the station performance.

Description
Perform minor mechanical maintenance throughout AHLS, including:
x Acquiring wet well bubbler critical spares: Acquire critical spares of the wet well bubbler compressors
x Improve mechanical seals: If the seal water goes out, the station goes out. Revise mechanical seal flush plan to eliminate seal water, or provide redundant seal water supply
x Sealing access hatches: Media - Access hatches are not sealed x Installing a manhole for FM bypass: Manhole for FM bypass, it is just flanged, and it is not functioning as station bypass. Because there are no valves on the bypass system, 05/13/2025 C9 923 of 1078
FY2023 R-CAMP Report
5-36
there is no way to bypass. They have to do Confined space entry is required to access the FM drain. This effort has already been authorized by Owners and is underway. The rehabilitation includes installing an above ground tee with dedicated connection points for: emergency bypass pump di scharge, connection point for alternate bypass, and cross-connection valve to allow for an alternate emergency bypass pump arrangement. x Pump installation for redundancy: Need one more pump for redundancy on the recirculation pump. Having redundancy provides better stewardship of potable water. x Equipment to lift pumps: Jib Crane - recommended by pump manufacturer. Need something like power jack to lift pumps.

Justification/Consequence
Early maintenance of mechanical wear can prevent further degradation and increase site safety.

Project Delivery
In-house services, and as-needed Contractor Services.

P-31002-003 Minor Structural Rehabilitation
Background
During the October 2021 site assessment, several locations of minor structural wear were identified and noted throughout AHLS. The structural wear wa s indicative of typical concrete and sealing degradation and improvement of structural condition of AHLS.

Description
Perform minor structural maintenance throughout AHLS, including:
x Build enclosure for generator switch near the odor control equipment x Build enclosure/wall for SDG&E cabinet
x Install inspection hatch on wet well: Modify wet well roof hatch to provide inspection hatch to allow for easy inspection and atmo spheric monitoring without the need to remove the entire panel/ hatch and eliminate need for fall protection. x Acquire platforms: Grid system or ladder fo r media filter. Personnel need to get in filter, so there is a need for a platform to be able to walk on it. x Acquire quick-connect adapters: Provide several quick-connect adapters for hose bibs.

Looking for quick connect fittings on hose bibs
x Installing sunshade: A sunshade or cover to stop vegetation growth x Installing skylight hatch protection: Protection for skylights and hatch x Modify roof drain outlet locations: Roof dra ins are going to stormwater basin. If something leaks on the roof, personnel will not be aware of it until they visit the station next time.
x Building ramp over fuel piping: Fuel piping needs a ramp to allow stepping over Justification/Consequence
Early maintenance of structural wear can prevent further degradation and increase site safety. 05/13/2025 C9 924 of 1078
FY2023 R-CAMP Report
5-37
Project Delivery
In-house services, and as-needed Contractor Services.

P-31002-004 SCADA Migration
Background
EWPCF is migrating to a new supervisory cont rol and data acquisition (SCADA) platform, and each of the remote facilities will also need to migrate to the new SCADA system for improved control and monitoring.

Description
Perform SCADA migration system for AHLS, including:
x SCADA migration
x Programming the bubbler pump Controls
x Generators disconnect switch: Integration of generator “not in auto” alarm to SCADA if any condition prevents generator from s tarting automatically (breaker open, switch not in auto)
Timing will be coordinated with Owner’s D/B effort.

Justification/Consequence
Improved control and monitoring.

Project Delivery
EWA’s Programmatic SCADA Integrator.

P-31002-005 Site Safety Improvement
Background
During the October 2021 site assessment, items and locations where safety can be improved were identified and noted throughout AHLS.

Description
Improve site safety tasks for AHLS, including:
x Installation of cellular signal booster: There is no cellular phone reception inside of the AHLS building. It is a critical safety conc ern to ensure that cellular phones and GPS systems work inside the building. Installing a booster system to ensure that cellular signals are achievable everywhere within the building. This needs to be compatible with the Blackline Safety Loner system
x Installing battery powered emergency lights: Install battery powered emergency lighting in pump room, motor room, generator room, and MCC
05/13/2025 C9 925 of 1078
FY2023 R-CAMP Report
5-38
x Installing lockout devices for va lves: Purchase lockout devices (application specific) in sufficient quantity to lock out wheel valves and ball valves throughout facility x Budgeting for annual acquisition of safety items
x Installing multiaccess locking (with Owners’ permission): Modify the north access bridge gates to allow for multiple agency locks to be used and accessed from either side of the gates. The chain and locks in place now are only accessible from one side of the gate, making access to bridge difficult. Bridge acce ss is used for emergency response if NRG route is inaccessible
Justification/Consequence
Increased site safety and regulatory conformance.

Project Delivery
In-house services, and as-needed Contractor Services.

P-31002-006 Spare Grinder Replacement
Background
Based on the February 2022 meeting with EWA staf f, grinder replacement was identified and noted as a onetime action for AHLS.

Description
Replacing spare grinder for AHLS.

Justification/Consequence
Increased site safety and regulatory conformance.

Project Delivery
In-house services.

P-31002-Recurring Grinder Rebuild
Background
The facility grinders require regular maintenance. This project addresses required maintenance and associated grinder rebuilds.

Description
Conduct required maintenance and associated grinder rebuilds.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
05/13/2025 C9 926 of 1078
FY2023 R-CAMP Report
5-39
In-house services.

P-31002-Recurring Sewage Pump and Motor Rebuild
Background
The sewage pumps and motors require regul ar maintenance. This project addresses required maintenance and associated pump and motor rebuilds.

Description
Conduct required maintenance and associated pump and motor rebuilds.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-31002-Recurring Integration Assistance
Background
This project addresses the integration of facility systems.

Description
Complete system integration as required.

Justification/Consequence
Programmatic SCADA Integrator Services.

Project Delivery
In-house services.

P-31002-Recurring Unplanned Minor Rehabilitation
Background
The facilities require various types of mainten ance and minor improvements as they age. This project enables EWA staff to provide maintenance and repair services for unforeseen items at all remote facilities.

Description
Conduct maintenance as required.

Justification/Consequence
05/13/2025 C9 927 of 1078
FY2023 R-CAMP Report
5-40
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-31002-Recurring Coatings and Paintings
Background
This project addresses required painting and coating noted through condition assessments or staff observation.

Description
Painting and coating of the facility.

Justification/Consequence
Painting and coating equipment provide protection and increases the reliability of the equipment.

Project Delivery
In-house services, or EWA’s As Needed Coating Contractor.

P-31002-Recurring VFD Repairs
Background
The VFDs require regular maintenance. This pro ject addresses required maintenance and VFD repairs.

Description
Conduct required maintenance and associated VFD repairs.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

ES-31002-Recurring R-CAMP Update
Background
The plan is to update the R-CAMP report for all remote facilities bi-annually. This project helps track the status of projects associated with AHLS.

Description
05/13/2025 C9 928 of 1078
FY2023 R-CAMP Report
5-41
Develop report for the projects associated with AHLS.

Justification/Consequence
R-CAMP report increases reliability and mitigates the risk for the facility.

5.4.2. Owners Projects
P-9.2.001 Incompatible Metals
This project has currently been identified as a study. Information on this study can be found in Section 4 (S-9.3.001).

P-9.2.002 Pump Station D/B Improvement
Background
During the October 2021 site assessment, tasks associated w ith addressing deficiencies from construction were identified and noted. This effort has already been authorized by Owners and is underway. Since R-CAMP is a comprehensive approach for proj ect identification and project evaluation, the projects identified during R-CAMP development process and authorized by Owners during the process are included in this report.

Description
Tasks associated with addressing deficiencies from construction.

Justification/Consequence
Improving the construction quality can prevent ea rly aging, deterioration, and degradation of structures.

Project Delivery
RFP-Contract.

P-9.2.Recurring Landscaping
Background
The landscaping design is intended to prevent the spread of wildfire, not attract vectors, and improve aesthetics.

Description
x Routine landscaping
Justification/Consequence
05/13/2025 C9 929 of 1078
FY2023 R-CAMP Report
5-42
Remove landscaping within the station fence line w ill prevent the spread of wildfire and vectors and improve aesthetics and increases site safety.

Project Delivery
RFP-Contract.

5.5. CARLSBAD WATER RECYCLING FACILITY PROJECTS

5.5.1. EWA Projects
P-38002-005 Minor Structural Rehabilitation
Background
During the October 2021 condition assessment, several loca tions of minor structural wear were identified and noted throughout CWRF. The structural wear was indicative of typical concrete and sealing degradation and improvement of structural condition of CWRF.

Description
Perform minor structural maintenance throughout CWRF, including:
x Minor crack repair
x Concrete stain removal: Remove concrete stains at locations such as: GMF below stairs, MF compressor pad, MF system slab, RO CIP tank, RWPS compressor pad, CPS/ SEEPS equipment pads
x Corrosion on the shade structures
x Exposed anchor bolts: Repair or replace expos ed anchor bolts at locations such as:

GMF platform, Recycled Water Storage Compartment north facing wall x Standing water evaluation: Evaluate locations of standing water and repair as necessary at locations such as: the ch emical delivery zone, RWPS electrical room, UF system slab
x Remove storage basin south wall: remove storage basin south wall at end of catwalk to allow access from both directions. It can be done at the same time as pipe rehabilitation as the pipe will need to be modified once the wall is removed x Install steps between containments: Ins tall steps between the Polymer/ Alum containment and UF bulk chemical storage area for easier access.

Justification/Consequence
Early maintenance of structural wear can prevent further degradation and increase site safety.

Project Delivery
In-house services, and as-needed Contractor Services.
05/13/2025 C9 930 of 1078
FY2023 R-CAMP Report
5-43
P-38002-008 Miscellaneous Service Request
Background
The October 2021 condition assessment indicated a variety of maintenance tasks recommended for CWRF associated with equipment inaccessibility and minor deficiencies.

Description
Identify and perform service requests, on an a nnual basis, to address miscellaneous minor deficiencies noted during the site assessment, including, but not limited to, the items listed below:
x AIT-0917 wire removal and capping: Analyzer AIT-0917 has been removed at the MF system. However, the power wiring is not capped with wire nuts. It is recommended to remove the existing wiring to the nearest junction box and cap with wire nuts x West canopy roof panels removal and replacement: Corrosion was noted at the west canopy roof panels. It is recommended to remove and replace the corroded panels x RIO panel condition assessment: The UF Trai n 3 remote input output panel has been repeatedly exposed to moisture. It is recommended to open the panel and assess its condition
Justification/Consequence
Completion of the above-mentioned tasks are r ecommended to promote the longevity of the specified equipment, increase safety, and improve the treatment process at CWRF.

Project Delivery
In-house services.

P-38002-010 Minor EI&C Rehabilitation
Background
During the October 2021 condition assessment, several lo cations of potential electrical and instrumentational deficiencies were noted throughout CWRF. The deficiencies were indicative of deterioration due to age. The assessment in cludes recommended improvements for additional control redundancy and improved safety throu gh testing plans and additional equipment monitoring.

Description
Perform minor EI&C maintenance throughout CWRF, including:
x Analyzer replacement: Replace chlorine analyzers as they have become unreliable x Sunshade replacement: The UF system ai r scour lines are becoming brittle due to sunlight (UV light) bypassing the UF area structure sunshade. Consider sunshade modification, tubing or budget for replacemen t of all UF system plastic tubing on a regular cycle or as needed
x Convert electrical boxes to stainless steel: Replace all plastic electrical boxes with stainless steel enclosures
05/13/2025 C9 931 of 1078
FY2023 R-CAMP Report
5-44
x Level monitoring equipment on flow junction box: Install level monitoring equipment in the flow junction box near the generator to alarm if level high x Level monitoring equipment on smaller tanks: Add level transmitter on smaller tanks x Install sample pump: Probes for chlorine concentration not accurate. Add permanent sample pumps for continued measurement for front and mid-CCT analyzers (both CCTs)
Justification/Consequence
Early maintenance of EI&C wear can prevent further degradation and increase site safety.

Project Delivery
In-house services, and as-needed Contractor Services.

P-38002-011 Minor Mechanical Rehabilitation
Background
During the October 2021 condition assessment, several minor mechanical tasks were identified and noted throughout CWRF. Tasks were associated with wear due to age or operational accessibility and recommended improvements to encourage equipment longevity and the station performance.

Description
Perform minor mechanical maintenance throughout CWRF, including:
x Motor rehabilitation: Chlorine Injector Mixer/CCT (M-1001-1) - Loud noise is produced by the motor when operating. It appears to be an operational issue x High-line reclaimed water to front yard: I nstall a high-line reclaimed water supply to the front yard
x Demolition of obsolete items, such as the thickening system: Demolish obsolete equipment and equipment labeled “out of service”, including the thickening system x Replace air scour piping: Air scour piping - Sign of severe corrosion on pipe body, welding and connection lines along the pipeline
x Install solenoid valves: Install solenoid valves on the air supply to the GMF air lift manifold and programming to GMF influent trough valves to allow the air supply and influent valves work together to allow air supply to stop when the filter influent valve is closed to prevent dirty sand from cycling and increasing the time needed to flush the unit. Solenoid plumbing and wiring have been completed; however, EWA is awaiting completion of programming to make it fully functional.
x Replace UV damaged air scour lines: The UF system air scour lines are becoming brittle due to sunlight (UV light) bypassing the UF area structure sunshade x Install piping to hypochlorite system: Re-pipe hypo system to add redundancy between hypo feed pump system (GMF to CCT, CCT to GMF). This task is completed during R-CAMP process
x Install sluice gate: Add sluice gate to North side CCT to provide isolation of basin for maintenance
05/13/2025 C9 932 of 1078
FY2023 R-CAMP Report
5-45
x Modify sump pump discharge: Modify sump pumps in chemical areas (other than hypo) to discharge away from street and return discharge to EWPCF x Install additional containment for chemical storage and splashes: Add a containment area adjacent to the sodium hypochlorite pit to allow for use of sodium hypochlorite to be used as a redundant means of supply. Modify piping to hypo pump feed line to allow for tie-in of a redundant supply to the system. Consider using the threshold inhibitor tank area (remove tank) or sulfur ic acid containment area (remove unused equipment)
x Install funnel skimmer: Add a funnel type skimmer on CCT x Pipe installation: Replace pipe around basins. Pipes around the basin leak x Drain installation: There is need for a drain addition so that have the drains back to the treatment citric acid, Sodium Hypo, and Sodium Bisulfite x Chemical pipe replacement: Many of the che mical pipe are leaking at joints. The chemical piping needs to be replaced.

Justification/Consequence
Early maintenance of mechanical wear can prevent further degradation and increase site safety.

Project Delivery
In-house services, and as-needed Contractor Services.

P-38002-012 Site Safety Improvements
Background
During the October 2021 condition assessment, items and locations where safety can be improved were identified and noted throughout CWRF.

Description
Improve site safety tasks for CWRF, including:
x Handrail improvements: Add handrail along wall side of stairs and along guardrail side from poly/alum pit to UF CIP chemical tanks area
x Install lockout switches for cabinets: Investigate methods and install lockout switches for UF air solenoids cabinets to allow for locki ng out of specific equipment rather than only closing the air supply to the entire air ca rd cabinet. It may be better accommodated by providing the ability to isolate individual air supply from each card to individual valves. x Install davit arm: Install davit arm at storage basins and CCT x Install a ladder and safety post: Install a ladde r cage on the roof access ladder attached to the East side (plant side) of the admin building
x Lighting improvement of street & canopy behind the gates (inside the facility) Justification/Consequence
Increased site safety and regulatory conformance.
05/13/2025 C9 933 of 1078
FY2023 R-CAMP Report
5-46
Project Delivery
In-house services, and as-needed Contractor Services.

P-38002-Recurring GMF Sand
Background
During the October 2021 condition assessment, it was noted that sand at GMF been partially replaced 6 years ago, and it is now planned to do full change of sand at GMF.

Description
Conduct required maintenance and associated improvements for GMF sand replacement.

Justification/Consequence
This project increases the reliability of the equipment.

Project Delivery
In-house services.

P-38002-Recurring Integration Assistance
Background
This project addresses the integration of facility systems.

Description
Complete system integration as required.

Justification/Consequence
Programmatic SCADA Integrator Services.

Project Delivery
In-house services.

P-38002-Recurring Unplanned Minor Rehabilitation
Background
The facilities require various types of mainten ance and minor improvements as they age. This project enables EWA staff to provide maintenance and repair services for unforeseen items at all remote facilities.

Description
Conduct maintenance as required.
05/13/2025 C9 934 of 1078
FY2023 R-CAMP Report
5-47
Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

P-38002-Recurring Coatings and Paintings
Background
This project addresses required painting and coating noted through condition assessments or staff observation.

Description
Painting and coating of the facility.

Justification/Consequence
Painting and coating equipment provide protection and increases the reliability of the equipment.

Project Delivery
In-house services, or EWA’s As Needed CoatingContractor.

P-38002-Recurring VFD Repairs
Background
The VFDs require regular maintenance. This pro ject addresses required maintenance and VFD repairs.

Description
Conduct required maintenance and associated VFD repairs.

Justification/Consequence
Maintenance increases the reliability of the equipment.

Project Delivery
In-house services.

ES-38002-Recurring R-CAMP Update
Background
The plan is to update the R-CAMP report for all remote facilities bi-annually. This project helps track the status of projects associated with CWRF.
05/13/2025 C9 935 of 1078
FY2023 R-CAMP Report
5-48
Description
Develop report for the projects associated with CWRF.

Justification/Consequence
R-CAMP report increases reliability and mitigates the risk for the facility.

5.5.2. Owners Projects
P-9.5.005 Equalization Basin Water Quality
Background
This project was introduced as a recommended study in R-CAMP 2021. This facility is downstream of CWRF regulatory compliance points, but is uncovered, which increases the probability of recycled water quality issues related to alga e growth, chlorine degradation and introduction of wind-transported debris into the stored recycled water. Summer months are the most susceptible to recycled water quality concerns.

Description
This project will reduce the risk of potential water quality issues within the Flow EQ Basin. The recommended option in Carlsbad Recycled Water Quality report is an Industrial Wet or Industrial Dry within the LG Sonic Industrial Line. Based on the dimensions of the Carlsbad Storage basins, installing a total of 2 Industrial West systems (one per basin) is suggested. For this project, the recommended option this report will be implemented.

Justification/Consequence
This project reduces the risk of potential future water quality issues.

Project Delivery
RFP-Contract.

P-9.5.008 RO Rehabilitation
This project has currently been identified as a study. Information on this study can be found in Section 4 (S-9.5.008).

P-9.5.009 MF Rehabilitation
This project has currently been identified as a study. Information on this study can be found in Section 4 (S-9.5.009).

P-9.5.010 GMF Bypass
This project has currently been identified as a study. Information on this study can be found in Section 4 (S-9.5.010).
05/13/2025 C9 936 of 1078
FY2023 R-CAMP Report
5-49
P-9.5.012 Operations and Adminstration Building Roof and HVAC Background
In April 2019, a few repairs were made to the Operations and Administration building roof. The roofing contractor identified that the Operations and Administration building roof may need to be replaced within approximately two years. During
October 2021 condition assessment, it was
identified and noted that a roof assessment by visu al inspection should be performed for both the roof and HVAC system to determine recommende d repairs. This project will implement the recommendations of the assessment which are yet to be determined.

Description
CWRF may be improved via the following project:
x Replace HVAC and repair roof
x Installing an air conditioner in the UPS room
x Installing eastside ladder cage
Justification/Consequence
This project increases the reliability and safety of the facility and mitigates the risk for the staff and facility.

Project Delivery
RFP-Contract.

P-9.5.013 Major Equipment CIP
Background
The October 2021 assessment identified and noted large facility component replacements or repairs required within the next 3-5 years. These repair s should be coordinated with future master plans and routinely reassessed. Results of studies noted within this R-CAMP should be considered for incorporation into this or other projects in the next R-CAMP cycle.

Description
CWRF may be improved via the following project:
x UF membrane replacement: The membranes at UF been installed in 2016 and their useful life is about 8-10 years so should be assessed and considered for replacement in 2024-2026
x Drainage/stormwater: As recommended by Carlsbad Engineer Keri Martinez and their storm water consultant (MOE), it would be desirable to add a trench drain along the south and western concrete slab s next to the open area to capture any hose down run off and direct it to the equalization basin (rat pit). Also, the storm water drain in close proximity to chemical areas should have the ability to be sealed off during chemical deliveries to avoid potential impacts from delivery leaks/ spills, and/or process overflows.
05/13/2025 C9 937 of 1078
FY2023 R-CAMP Report
5-50
This project needs to be coordination closely with Facility Level Assessment.

Justification/Consequence
Replacement of aged equipment will encourage station reliabilit y and increase site safety.

Additional improvements will enhance facility robustness.

Project Delivery
RFP-Contract.

P-9.5.014 Access between CWRF and CPS
This project has currently been identified as a study. Information on this study can be found in Section 4 (S-9.5.014).

P-9.5.016 Facility Level Assessment
This project has currently been identified as a study. Information on this study can be found in Section 4 (S-9.5.016).

P-9.5.Recurring Landscaping
Background
The landscaping will help to prevent the spread of wildfire, reduce vectors and improve aesthetics.

Description
x Development of landscaping
x Routine landscaping
x Use of recycled water
Justification/Consequence
Remove landscaping within the station fence line w ill prevent the spread of wildfire and vectors and improve aesthetics and increases site safety.

Project Delivery
RFP-Contract.
05/13/2025 C9 938 of 1078
FY2023 R-CAMP Report
6-1

6. PROJECT EVALUATION AND PRIORITIZATION
After the R-CAMP projects have been identified, each project assigned to EWA and the Owners is individually evaluated, ranked, and scored based on a set of selected evaluation criteria. The projects are then prioritized using a comparison of project scores versus project costs. This section describes the process of evaluating and prioritizing projects which is a step towards development of a project schedule and cash flow.

6.1. EVALUATION CRITERIA
The six evaluation criteria for evaluating projects are listed and defined below.

1. Safety – This criterion assesses improvements required to maintain a safe working environment for EWA personnel and visitors as well as the impact that a project will have on the risk of an accident occurring.

2. Regulatory Compliance – This criterion assesses the ab ility of a project to impact compliance with current and/or anticipated regulatory requirements.

3. Reliability – This criterion assesses the timeframe in which existing assets related to a project will reach the end of their useful life and the potential consequence of the assets reaching the end of their useful life before replacement or rehabilitation.

4. Public and EWA Impacts – This criterion assesses the impact that a project will have on sound levels, appearance (sight), and traffic levels to EWA and the public at the remote sites.

5. Energy Efficiency – This criterion assesses the energy effectiveness and benefits of implementing a project through a reduction in en ergy usage and increase in energy self- sufficiency.

6. Organizational Efficiency – This criterion assesses the ab ility of a project to impact EWA’s capacity to manage resources, achie ve goals, and create a positive worki ng environment for personnel.

The six evaluation criteria have b een assigned a criticality factor from 1 to 6 with 1 representing the lowest level of importance and 6 representing the highest. Each criticality factor has been uniquely assigned to each evaluation criteria. Th e assigned criticality factors stay with their corresponding evaluation criteria throughout the project evaluation process. The criticality factor assigned to an evaluation criterion reflects the relative level of importance of each criterion. Table 6-1 provides the evaluation criteria and their assigned criticality factors. 05/13/2025 C9 939 of 1078
FY2023 R-CAMP Report
6-2
Table 6-1: Evaluation Criteria
Evaluation Criteria Criticality Factor
Safety 6
Regulatory Compliance 5
Reliability 4
Public and EWA Impacts 3
Energy Efficiency 2
Organizational Efficiency 1

6.2. IMPACT FACTORS
Each project has been assigned an impact factor across each of the six defined evaluation criteria from 0 to 5. An impact factor of 0 represents the lowest (minimum) factor and 5 represents the highest (maximum) factor. The impact factors provide a relativ e comparison of each project’s ability to satisfy each of the defined evaluation criteria. Table 6-2 provides the parameters that were used for assigning impact factors to projects against the evaluation criteria.

6.3. EVALUATION SCORING RESULTS
The impact factors assigned to a project for e ach evaluation criteria are then multiplied by the criticality factor of the evaluation criteria to calculate criteria scores as seen in the formula below. ݎ݋ݐܿܽܨݐܿܽ݌݉ܫ
The six criteria scores are then summed to determine the evalu ation score for each project. The scoring results for FY2023 R-CAMP projects are provided in Table 6-3 through Table 6-12 by ascending project number and by descending score according to project responsibility designation.

These scoring results demonstrate the overall be neficial impact to the EWA organization in meeting its mission, goals and objectives.

Projects in the R-CAMP may either need to be funded and initiated or may have already been initiated but still require more funding. Projects that have already been initiated but still require more funding are not scored in the R-CAMP since they have previously been selected for implementation. Projects that are reoccurring, such as on an annual basis, need to be funded and initiated each time they are scheduled to occ ur. Condition assessments, engineering services, special studies, and other services are not scored.
05/13/2025 C9 940 of 1078
FY2023 R-CAMP Report
6-3
Table 6-2: Project Impact Factor Parameters
Evaluation Criteria
Impact Factor Safety Regulatory
Compliance Reliability Public and EWA
Impacts Energy Efficiency Organizational
Efficiency
5 Significant
improvements to safe
working conditions
and/or reduction in risk
of an accident
occurring
Significant beneficial
impact to complying
with current and/or
future regulatory
requirements
Asset end of useful life
is imminent and has
significant/major
consequences if
reached
Significant beneficial
impact to sound levels,
appearance, and/or traffic
levels at and beyond the
facility.

Significant reduction in
energy usage and
increase in self-
sufficiency
Significant beneficial
impacts to resource
management, achieving
goals, and creating a
positive working
environment
4 Major improvements to
safe working conditions
and/or reduction in risk
of an accident
occurring
Major beneficial impact
to complying with
current and/or future
regulatory requirements
Asset end of useful life
is nearing and has
significant/major
consequences if
reached
Major beneficial impact
to sound levels,
appearance, and/or traffic
levels at and beyond the
facility.

Major reduction in
energy usage and
increase in self
-
sufficiency
Major beneficial
impacts to resource
management, achieving
goals, and creating a
positive working
environment
3 Moderate
improvements to safe
working conditions
and/or reduction in risk
of an acci
dent
occurring
Moderate beneficial
impact to complying
with current and/or
future regulatory
requirements
Asset end of useful life
is imminent and has
moderate/minor
consequences if
reached
Moderate beneficial
impact to sound levels,
appearance, and/or traffic
levels at and beyond the
facility.

Moderate reduction in
energy usage and
increase in self-
sufficiency
Moderate beneficial
impacts to resource
management, achieving
goals, and creating a
positive working
environment
2 Minor improvements to
safe working conditions
and/or reduction in risk
of an accident
occurring
Minor beneficial
impact to complying
with current and/or
future regulatory
requirements
Asset end of useful life
is nearing and has
moderate/minor
consequences if
reached
Minor beneficial impact
to sound levels,
appearance, and/or traffic
levels at and beyond the
facility.

Minor reduction in
energy usage and
increase in self
-
sufficiency
Minor beneficial
impacts to resource
management, achieving
goals, and creating a
positive working
environment
1 Insignificant
improvements to safe
working conditions
and/or reduction in risk
of an
accident
occurring
Insignificant beneficial
impact to complying
with current and/or
future regulatory
requirements
Asset end of useful life
is far-off and has minor
or greater consequences
if reached
Insignificant beneficial
impact to sound levels,
appearance, and/or traffic
levels at and beyond the
facility.

Insignificant reduction
in energy usage and
increase in self-
sufficiency
Insignificant beneficial
impacts to resource
management, achieving
goals, and creating a
positive working
environment
0 No improvements to
safe working conditions
and/or reduction in risk
of an accident
occurring
No beneficial impact to
complying with current
and/or future regulatory
requirements
Asset end of useful life
is far-off and has
insignificant/no
consequences if
reached
No beneficial impact to
sound levels, appearance,
and/or traffic levels at and
beyond the facility.

No reduction in energy
usage and increase in
self-sufficiency
No beneficial impacts
to resource
management, achieving
goals, and creating a
positive working
environment
05/13/2025 C9 941 of 1078
FY2023 R-CAMP Report
6-4
Table 6-3: BCPS Project Scoring – Descending Score
Project No. Capital Project Lead Agency
Safety Regulatory
Compliance Reliability Public and
EWA Impacts
Energy
Efficiency
Organizational
Efficiency Total
Score
Total Estimated
Cost
6 54 3 2 1
P-9.4.009
Mechanical Modifications
(formerly Modify Discharge
Valve Installation)
Owner 2 35 1 0 4 54 $ 797,000
P/S-9.4.008 Bypass study Owner 2 3 3 1 0 4 46 $ 25,000 P-37002-005 Site Safety Improvements EWA 4 3 1 0 0 1 44 $ 29,000 P-9.4.005 Scum and FOG Abatement Owner 4 0 1 2 2 5 43 $ 521,000 P-37002-002 Minor Mechanical
Rehabilitation EWA 2 23 1 2 2 43 $ 14,000
P-37002-001 Minor EI&C Rehabilitation EWA 3 2 3 0 0 2 42 $ 89,000 P-9.4.004 Major Equipment CIP Owner 2 2 2 2 1 2 40 $ 805,000 P-37002-004 SCADA Migration EWA 1 1 4 3 0 4 40 $ 58,000 P-37002-006 Structural Improvements EWA 3 0 3 2 0 3 39 $ 8,000 P-37002-003 Minor Structural
Rehabilitation EWA 2 03 3 0 3 36 $ 73,000
P-9.4.006 Site Security Improvements Owner 2 0 3 3 0 2 35 $ 62,000 P-9.4.007 Civil Improvement Owner 4 0 0 1 0 0 27 $ 240,000

1. Recurring projects are not scored
05/13/2025 C9 942 of 1078
FY2023 R-CAMP Report
6-5
Table 6-4: BCPS Project Scoring – Ascending Project Number Project No. Capital Project Lead Agency
Safety Regulatory
Compliance Reliability Public and
EWA Impacts
Energy
Efficiency
Organizational
Efficiency Total
Score
Total Estimated
Cost
6 54 3 2 1
P-37002-001 Minor EI&C Rehabilitation EWA 3 2 3 0 0 2 42 $ 89,000 P-37002-002 Minor Mechanical
Rehabilitation EWA 2 23 1 2 2 43 $ 14,000
P-37002-003 Minor Structural
Rehabilitation EWA 2 03 3 0 3 36 $ 73,000
P-37002-004 SCADA Migration EWA 1 1 4 3 0 4 40 $ 58,000 P-37002-005 Site Safety Improvements EWA 4 3 1 0 0 1 44 $ 29,000 P-37002-006 Structural Improvements EWA 3 0 3 2 0 3 39 $ 8,000 P-9.4.004 Major Equipment CIP Owner 2 2 2 2 1 2 40 $ 805,000 P-9.4.005 Scum and FOG Abatement Owner 4 0 1 2 2 5 43 $ 521,000 P-9.4.006 Site Security Improvements Owner 2 0 3 3 0 2 35 $ 62,000 P-9.4.007 Civil Improvement Owner 4 0 0 1 0 0 27 $ 240,000 P/S-9.4.008 Bypass study Owner 2 3 3 1 0 4 46 $ 25,000 P-9.4.009
Mechanical Modifications
(Formerly Modify Discharge
Valve Installation)
Owner 2 35 1 0 4 54 $ 797,000

1. Recurring projects are not scored
05/13/2025 C9 943 of 1078
FY2023 R-CAMP Report
6-6
Table 6-5: RBPS Project Scoring – Descending Score
Project No. Capital Project Lead Agency
Safety Regulatory
Compliance Reliability Public and
EWA Impacts
Energy
Efficiency
Organizational
Efficiency Total
Score
Total Estimated
Cost
6 54 3 2 1
P-39002-005 Site Safety Improvements EWA 4 3 1 0 0 4 47 $ 13,000 P-9.1.010 Scum and FOG Abatement
Project Owner 4 01 2 2 5 43 $ 486000
S/P-9.1.006 Containment Basin Repair Owner 0 5 3 1 0 3 43 $ 50,000 P-39002-004 SCADA Migration EWA 1 1 4 3 0 4 40 $ 58,000 P-9.1.011 Site Security Improvements Owner 3 0 3 2 0 3 39 $ 383,000 P-9.1.008 Major Equipment CIP Owner 1 2 2 2 2 2 36 $ 103,000 P-39002-003 Minor Structural
Rehabilitation EWA 2 03 3 0 3 36 $ 14,000
P-39002-001 Minor EI&C Rehabilitation EWA 2 2 2 0 0 2 32 $ 72,000 P-39002-002 Minor Mechanical
Rehabilitation EWA 2 22 0 0 2 32 $ 22,000
S/P-9.1.009 Pump Station Resiliency Owner 2 0 2 2 0 1 27 $ 27,000

1. Recurring projects are not scored
05/13/2025 C9 944 of 1078
FY2023 R-CAMP Report
6-7
Table 6-6: RBPS Project Scoring – Ascending Project Number Project No. Capital Project Lead Agency
Safety Regulatory
Compliance Reliability Public and
EWA Impacts
Energy
Efficiency
Organizational
Efficiency Total
Score
Total Estimated
Cost
6 54 3 2 1
P-39002-001 Minor EI&C Rehabilitation EWA 2 2 2 0 0 2 32 $ 72,000 P-39002-002 Minor Mechanical
Rehabilitation EWA 2 22 0 0 2 32 $ 22,000
P-39002-003 Minor Structural
Rehabilitation EWA 2 03 3 0 3 36 $ 14,000
P-39002-004 SCADA Migration EWA 1 1 4 3 0 4 40 $ 58,000 P-39002-005 Site Safety Improvements EWA 4 3 1 0 0 4 47 $ 13,000 S/P-9.1.006 Containment Basin Repair Owner 0 5 3 1 0 3 43 $ 50,000 P-9.1.008 Major Equipment CIP Owner 1 2 2 2 2 2 36 $ 103,000 S/P-9.1.009 Pump Station Resiliency Owner 2 0 2 2 0 1 27 $ 27,000 P-9.1.010 Scum and FOG Abatement
Project Owner 4 01 2 2 5 43 $ 486,000
P-9.1.011 Site Security Improvements Owner 3 0 3 2 0 3 39 $ 383,000

1. Recurring projects are not scored
05/13/2025 C9 945 of 1078
FY2023 R-CAMP Report
6-8
Table 6-7: BVPS Project Scoring – Descending Score
Project No. Capital Project Lead Agency
Safety Regulatory
Compliance Reliability Public and
EWA Impacts
Energy
Efficiency
Organizational
Efficiency Total
Score
Total
Estimated
Cost6 54 3 2 1
S/P-9.3.010
Facility-Level Alternative Analysis
(Formerly known as Relocation
Feasibility)
Owner 1 34 3 2 2 52 $ 250,000
P-32002-005 Site Safety Improvements EWA 4 3 1 0 0 4 47 $ 90,000 P-9.3.009 Site Security Improvements Owner 4 0 3 2 0 3 45 $ 193,000 S/P-9.3.008 Major Equipment CIP Owner 2 1 3 2 2 2 41 $ 2,261,000 P-32002-004 SCADA Migration EWA 1 1 4 3 0 4 40 $ 58,000 P-32002-001 Minor EI&C Rehabilitation EWA 3 2 2 0 0 2 38 $ 161,000 P-32002-006 Structural Improvements EWA 3 0 3 2 0 3 39 $ 15,000 P-32002-003 Minor Structural Rehabilitation EWA 2 0 3 3 0 3 36 $ 187,000 P-32002-002 Minor Mechanical Rehabilitation EWA 2 2 2 0 0 2 32 $ 63,000

1. Recurring projects are not scored
05/13/2025 C9 946 of 1078
FY2023 R-CAMP Report
6-9
Table 6-8: BVPS Project Scoring – Ascending Project Number Project No. Capital Project Lead Agency
Safety Regulatory
Compliance Reliability Public and
EWA Impacts
Energy
Efficiency
Organizational
Efficiency Total
Score
Total Estimated
Cost
6 54 3 2 1
P-32002-001 Minor EI&C Rehabilitation EWA 3 2 2 0 0 2 38 $ 161,000 P-32002-002 Minor Mechanical
Rehabilitation EWA 2 22 0 0 2 32 $ 63,000
P-32002-003 Minor Structural
Rehabilitation EWA 2 03 3 0 3 36 $ 187,000
P-32002-004 SCADA Migration EWA 1 1 4 3 0 4 40 $ 58,000 P-32002-005 Site Safety Improvements EWA 4 3 1 0 0 4 47 $ 90,000 P-32002-006 Structural Improvements EWA 3 0 3 2 0 3 39 $ 15,000 S/P-9.3.008 Major Equipment CIP Owner 2 1 3 2 2 2 41 $ 2,261,000 P-9.3.009 Site Security Improvements Owner 4 0 3 2 0 3 45 $ 193,000 S/P-9.3.010
Facility-Level Alternative
Analysis (Formerly known
as Relocation Feasibility)
Owner 1 34 3 2 2 52 $ 250,000

1. Recurring projects are not scored
05/13/2025 C9 947 of 1078
FY2023 R-CAMP Report
6-10
Table 6-9: AHLS Project Scoring – Descending Score
Project No. Capital Project Lead Agency
Safety Regulatory
Compliance Reliability Public and
EWA Impacts
Energy
Efficiency
Organizational
Efficiency Total
Score
Total
Estimated
Cost6 54 3 2 1
P-9.2.002 Pump Station D/B
Improvement2 Owner 3 33 2 0 1 52 $ 6,000,000
P-31002-6 Replace Spare Grinder EWA 4 3 1 0 0 4 47 $ 80,000 P-31002-5 Site Safety Improvements EWA 4 3 1 0 0 4 47 $ 133,000 P-31002-2 Minor Mechanical
Rehabilitation EWA 2 24 1 0 2 43 $ 25,000
P-31002-4 SCADA Migration EWA 1 1 4 3 0 4 40 $ 60,000 P-31002-3 Minor Structural
Rehabilitation EWA 2 03 3 0 3 36 $ 119,000
P-31002-1 Minor EI&C Rehabilitation EWA 2 2 2 0 0 2 32 $ 189,000 S/P-9.2.001 Incompatible Metals Owner 0 0 3 0 0 1 13 $ 25,000

1. Recurring projects are not scored

2. Pump Station D/B Improvement is already budgeted for P-0.2.002 project and it starts in April 2022 05/13/2025 C9 948 of 1078
FY2023 R-CAMP Report
6-11
Table 6-10: AHLS Project Scoring – Ascending Project Number Project No. Capital Project Lead Agency
Safety Regulatory
Compliance Reliability Public and
EWA Impacts
Energy
Efficiency
Organizational
Efficiency Total
Score
Total
Estimated
Cost6 54 3 2 1
P-31002-1 Minor EI&C Rehabilitation EWA 2 2 2 0 0 2 32 $ 189,000 P-31002-2 Minor Mechanical
Rehabilitation EWA 2 24 1 0 2 43 $ 25,000
P-31002-3 Minor Structural
Rehabilitation EWA 2 03 3 0 3 36 $ 119,000
P-31002-4 SCADA Migration EWA 1 1 4 3 0 4 40 $ 60,000 P-31002-5 Site Safety Improvements EWA 4 3 1 0 0 4 47 $ 133,000 P-31002-6 Replace Spare Grinder EWA 4 3 1 0 0 4 47 $ 80,000 S/P-9.2.001 Incompatible Metals Owner 0 0 3 0 0 1 13 $ 25,000 P-9.2.002 Pump Station D/B
Improvement Owner 3 33 2 0 1 52 $ 6,000,000

1. Recurring projects are not scored

2. Pump Station D/B Improvement is already budgeted for P-0.2.002 project and it starts in April 2022 05/13/2025 C9 949 of 1078
FY2023 R-CAMP Report
6-12
Table 6-11: CWRF Project Scoring – Descending Score
Project No. Capital Project Lead Agency
Safety Regulatory
Compliance Reliability Public and
EWA Impacts
Energy
Efficiency
Organizational
Efficiency Total
Score
Total Estimated
Cost
6 54 3 2 1
P-38002-012 Site Safety Improvements EWA 4 3 1 0 0 4 47 $ 168,000 P-9.5.012
Operations and
Administration Building
Roof and HVAC
Owner 3 04 1 0 2 39 $ 428,000
P-38002-005 Minor Structural
Rehabilitation EWA 2 03 3 0 3 36 $ 35,000
P-38002-008 Miscellaneous Service
Requests EWA 2 03 3 0 2 35 $ 13,000
P-38002-010 Minor EI&C Rehabilitation EWA 2 2 2 0 0 2 32 $ 262,000 P-38002-011 Minor Mechanical
Rehabilitation EWA 2 22 0 0 2 32 $ 668,000
P - 9.5.013 Major Equipment CIP Owner 0 3 2 1 1 1 29 $ 2,000,000 S/P-9.5.010 GMF Bypass Owner 0 3 2 0 1 2 27 $ 27,000 S/P-38002-004 Clean-in-Place Chemical
Optimization Owner 0 03 3 2 2 27 $ 27,000
S/P 9.5.014 Access between CWRF and
CPS Owner 2 00 3 0 3 24 $ 25,000
S/P - 9.5.016 Facility Level Assessment Owner 0 2 2 0 1 2 22 $ 100,000 P-9.5.005 Equalization Basin Water
Quality Owner 0 00 4 0 1 13 $ 28,000
S/P-9.5.008 RO Rehabilitation Owner 0 1 0 0 0 2 7 $ 27,000 S/P-9.5.009 MF Rehabilitation Owner 0 0 0 0 0 2 2 $ 27,000

1. Recurring projects are not scored
05/13/2025 C9 950 of 1078
FY2023 R-CAMP Report
6-13
Table 6-12: CWRF Project Scoring – Ascending Project Number Project No. Capital Project Lead Agency
Safety Regulatory
Compliance Reliability Public and
EWA Impacts
Energy
Efficiency
Organizational
Efficiency Total
Score
Total Estimated
Cost
6 54 3 2 1
P-38002-005 Minor Structural
Rehabilitation EWA 2 03 3 0 3 36 $ 35,000
P-38002-008 Miscellaneous Service
Requests EWA 2 03 3 0 2 35 $ 13,000
P-38002-010 Minor EI&C Rehabilitation EWA 2 2 2 0 0 2 32 $ 262,000 P-38002-011 Minor Mechanical
Rehabilitation EWA 2 22 0 0 2 32 $ 668,000
P-38002-012 Site Safety Improvements EWA 4 3 1 0 0 4 47 $ 168,000 S/P-38002-004 Clean-in-Place Chemical
Optimization Owner 0 03 3 2 2 27 $ 27,000
P-9.5.005 Equalization Basin Water
Quality Owner 0 00 4 0 1 13 $ 28,000
S/P-9.5.008 RO Rehabilitation Owner 0 1 0 0 0 2 7 $ 27,000 S/P-9.5.009 MF Rehabilitation Owner 0 0 0 0 0 2 2 $ 27,000 S/P-9.5.010 GMF Bypass Owner 0 3 2 0 1 2 27 $ 27,000 P-9.5.012
Operations and
Administration Building
Roof and HVAC
Owner 3 04 1 0 2 39 $ 428,000
P-9.5.013 Major Equipment CIP Owner 0 3 2 1 1 1 29 $ 2,000,000 S/P-9.5.014 Access between CWRF and
CPS Owner 2 00 3 0 3 24 $ 25,000
S/P-9.5.016 Facility Level Assessment Owner 0 2 2 0 1 2 22 $ 100,000

1. Recurring projects are not scored
05/13/2025 C9 951 of 1078
FY2023 R-CAMP Report
6-14

6.4. PROJECT PRIORITIZATION
The projects in the FY2023 R-CAMP are prioritized by taking into consideration the evaluation scoring results (organization impact) and costs, as illustrated in Figure 6-1 through Figure 6-5.N o t all projects are provided on this figure due to th eir higher costs which impacts the scale of the figure. However, these projects are still evaluate d and compared to the other projects in the R- CAMP. Through this comparison, projects may be assigned to one of the following four categories:

1. Low cost and high impact – Highest Priority Projects provide EWA with the highest organization impact relative to their cost. Due to their relatively lower costs such projects may be more readily implemented than proj ects requiring greater capital. These may constitute, “near-term” project priorities to be implemented quickly and efficiently.

2. High cost and high impact – Priority Projects are those projects that provide a high organization impact, but because of their relatively high cost, may require additional time to implement due to the complexities inherent in larger capital projects. These projects may garner the most attention in EWA’s CIP.

3. Low cost and low impact – Mid-Priority Projects are those projects in which their relative low cost is matched by their relatively low organization impact. Such projects should be prioritized after addressing the above two categories of projects.

4. High cost and low impact – Low Priority Projects deliver relatively low organization impact relative to their cost and should be considered only after the above-listed categories of projects are addressed, or in combination with other projects (which may improve their cost/benefit).

The comparison of project costs and organization impact allows EWA to consider both costs and scoring results in prioritizing, funding, and scheduli ng its CIP. Since recurring projects are not scored, they are not shown here.
05/13/2025 C9 952 of 1078
FY2023 R-CAMP Report
6-15
Figure 6-1: BCPS Project Cost vs Organization Impact
05/13/2025 C9 953 of 1078
FY2023 R-CAMP Report
6-16
Figure 6-2: RBPS Project Cost vs Organization Impact
05/13/2025 C9 954 of 1078
FY2023 R-CAMP Report
6-17
Figure 6-3: BVPS Project Cost vs Organization Impact
05/13/2025 C9 955 of 1078
FY2023 R-CAMP Report
6-18
Figure 6-4: AHLS Project Cost vs Organization Impact
05/13/2025 C9 956 of 1078
FY2023 R-CAMP Report
6-19
Figure 6-5: CWRF Project Cost vs Organization Impact
05/13/2025 C9 957 of 1078
FY2023 R-CAMP Report
7-1

7. RECOMMENDED PROJECT IMPLEMENTATION SCHEDULE AND

COST SUMMARY

7.1. IMPLEMENTATION SCHEDULE AND COST SUMMARY
The recommended project implementation schedule and cost su mmary is based upon the project evaluation and prioritization process presented in this R-CAMP. The implementation schedule and cost summary provide a breakdown of projects based on the year(s) they are assigned to. The recommended project implementation sche dules for prioritized projects for FY2023 through FY2028 are presented as Figure 7-1: Recommended Implementation Schedule for Prioritized BCPS Projects through Figure 7-1 through Figure 7-5. The projected costs by fiscal year for prioritized projects are presented in Table 7-1 through Ta ble 7-5. The capital improvement budgets for projects planned for execution over the next six years, FY2023 through FY2028, are summarized in Table 7-1 through Table 7-5 by category related to the facility.

7.2. WHAT’S NEXT
The recommended project impleme ntation schedule and projected cost summary is provided to give EWA staff and Owners the information th at can be leveraged during the budgeting process.

EWA staff and Owners can utilize this informa tion as a decision-making roadmap in their upcoming budgeting process.

Every year the E-CAMP or R-CAMP is updated on an alternating basis. In Spring 2021, EWA updated the E-CAMP prior to the start of FY 2022. EWA will update it next in Spring 2023 prior to FY 2024. Then EWA will treturn to updating the R-CAMP in Spring 2024 prior to FY 2025, and so forth
Subsequent R-CAMPs will monitor and re-evaluate projects within and beyond the six-year implementation schedule provided in this R-CAMP, including incorporating recommendations from studies. Common themes of these projects that should continue to be evaluated and considered include:
x Rehabilitation and replacement of aging infrastructure x Facility expansion and coordination with Owner master planning efforts x Improvements to reduce impacts to the public and EWA (such as sound, appearance, and traffic)
x Efficiency optimization
x Future regulatory and industry trends
05/13/2025 C9 958 of 1078
FY2023 R-CAMP Report
7-2
Figure 7-1: Recommended Implementation Schedule for Prioritized BCPS Projects 05/13/2025 C9 959 of 1078
FY2023 R-CAMP Report
7-3
Table 7-1: Projected Cost by Fiscal Year for Prioritized BCPS Projects 05/13/2025 C9 960 of 1078
FY2023 R-CAMP Report
7-4
Figure 7-2: Recommended Implementation Schedule for Prioritized RBPS Projects 05/13/2025 C9 961 of 1078
FY2023 R-CAMP Report
7-5
Table 7-2: Projected Cost by Fiscal Year for Prioritized RBPS Projects 05/13/2025 C9 962 of 1078
FY2023 R-CAMP Report
7-6
Figure 7-3: Recommended Implementation Schedule for Prioritized BVPS Projects 05/13/2025 C9 963 of 1078
FY2023 R-CAMP Report
7-7
Table 7-3: Recommended Implementation Schedule for Prioritized BVPS Projects 05/13/2025 C9 964 of 1078
FY2023 R-CAMP Report
7-8
Figure 7-4: Recommended Implementation Schedule for Prioritized AHLS Projects 05/13/2025 C9 965 of 1078
FY2023 R-CAMP Report
7-9
Table 7-4: Recommended Implementation Schedule for Prioritized AHLS Projects 05/13/2025 C9 966 of 1078
FY2023 R-CAMP Report
7-10
Figure 7-5: Recommended Implementation Schedule for Prioritized CWRF Projects 05/13/2025 C9 967 of 1078
FY2023 R-CAMP Report
7-11
Table 7-5: Recommended Implementation Schedule for Prioritized CWRF Projects 05/13/2025 C9 968 of 1078
FY2023 R-CAMP Report
Appendix A1
Appendix A: Historical Project List
Fiscal Year 2016-2021
Projects selected for implementation between FY 2016 and FY 2021 are listed below. These projects have been completed unless otherwise noted.

1. P-37002-007 BCPS - Communication Improvement

2. P.4.007 BCPS - Water Meter Access

3. P-38002-001 CWRF - Reverse Osmosis Decommissioning

4. P-38002-002 CWRF - Microfiltrat ion System Decommissioning

5. P-38002-003 CWRF - Sodium Hypochlorite Improvements

6. P-38002-013 CWRF - Equali zation Basin Settlement
Fiscal Year 2009-2014
Projects selected for implementation between FY 2009 and FY 2014 are listed below. These projects have been completed unless otherwise noted.

1. P –9.1.004 RBPS – Redundant PLC

2. 2. P –9.1.005 RBPS – Coating Odor Tower Piping

3. 3. P –9.3.004 BVPS – Pavement Seal

4. 4. P –9.3.005 BVPS – Coat Interior of Original Surge Tank

5. 5. P –9.3.006 BVPS – Pump Programming Modifications

6. 6. P –9.3.007 BVPS – Security Fence Modifications

7. 7. P –9.4.002 BCPS – Corrosion Repair and Coating

8. 8. P –9.4.003 BCPS – Replace Engine Silencers

9. 9. P –9.5.001 CWRF – Failsafe Pipeline

10. 10. CA –9.9.301 BVPS – Surge Tank Interior CA

11. CA –9.9.501 CWRF – GMF Piping and Chemical Systems CA

12. CWRF - Granular Media Fi lters, Added Sand Media

13. P –9.3.003 BVPS – Rehab Orig Forcemain Section Over Creek

14. CWRF - Control System Upgrade
05/13/2025 C9 969 of 1078
FY2023 R-CAMP Report
Appendix B1
Appendix B: Basis of Estimate
PROJECT INFORMATION:

Client: Encina Wastewater Authority
Project: FY2023 R-CAMP
Estimate Date: 1/1/2022
Estimate Type: Preliminary
AACEI Class Level Estimate: 4
PROJECT DESCRIPTION:

The R-CAMP and related documentation is updated to provide a current, organized register of major assets and associated estimated asset service life remaining for the major equipment and materials at the remote facilities. Through the R-CAMP, EWA staff and Owners’project short and long-term future expenditures for capital improvement projects. Scope of projects included are described in the R-CAMP under Section 4 and Section 5. Projects vary in nature from studies to maintenance projects. Estimates are provided to provide planning level order of magnitude costs.

ESTIMATE DOCUMENTS:

DRAWINGS: N/A
DOCUMENTS: FY 2022 Operating & Capital Budget
COSTS PROVIDED BY OTHERS: Encina Wastewater Authority,
R-CAMP Report 2021,
Quotes provided by third parties to
Encina Wastewater Authority
SOURCE OF COST DATA:

Costs for previously estimated projects, in particular FY2021 R-CAMP, were obtained from documents listed above with adjustment to current ENR CCI as described below under escalation and by applying inflation factor to reflect the annual increase in the estimated costs. New projects were estimated using RS Means CostWorks 2021 data, Hazen’s internal estimating database, and project data from similar reference projects. Allowances were used for items where scope was less defined.

ESTIMATE ASSUMPTIONS:

The followings assumptions were made in the preparation of this estimate:

For purpose of these estimates the following conditions were assumed unless specifically called out otherwise in the individual project estimates:
05/13/2025 C9 970 of 1078
FY2023 R-CAMP Report
Appendix B2
Some projects will be publicly bid and prevailing wage requirements will apply. Regular working hours will be allowed (7:00am - 5:00pm). Some projects will be completed in-house.

SPECIFIC INCLUSIONS:

The estimate does not include the following:

Contaminated soils removal or disposal not included unless specifically listed in project descriptions.

Hazardous or Special Waste removal or disposal not included unless specifically listed in project descriptions.

No special foundations or piles are included unless specifically listed in project descriptions.

Owners Costs for program management, legal and admi nistration costs, agency funding coordination, permitting, and public outreach are not included.

A project contingency is included for each project. This contingency is to include an allowance for indeterminates, and work items where scope is not fully detailed at this stage of design. Typically, as design level progresses the contingency is reduced. For p rojects which do not yet have a preliminary design completed a project contingency of 40% was used. Some specific projects that have a more defined and limited scope defined a lower project contingency was used. The percentage used for each project is shown on the individual project estimate. For some projects, the contingency was adjusted based on the complexity of the projects.

Note: This allowance is intended to provide a Design Contingency allowance. It is not intended to provide for a Construction Contingency for change orders during construction or to cover unforeseen conditions.

ESCALATION:

An escalation factor has not been included. Owners should include escalation to adjust cost to project schedules.

The Owners are cautioned that the project cost should be adjusted for any changes in the project schedule.

ENR CCI Jan -2022 12996.09 12144.49 Jan-2020 Los Angeles Annual Inflation Escalation Factor: Not included
ACCURACY:

The level of accuracy is commensurate with leve ls developed by the AACE, the Association for the Advancement of Cost Engineering International. At increasing levels of design completion, the narrower the range between upper and lower limits and the greater the accuracy of the estimate. These estimates are considered a Class 4 level estimate in accordance with AACE guidelines and are meant for planning purposes. Typically, this level of estimate has an expected accuracy range of +50 on high side and -30% on low side.

The enclosed Engineer’s Estimate of Probable Construction Cost is only an opinion of possible items that may be considered for budgeting purposes. These Probable Construction Cost Estimates are limited to the conditions existing at issuance and are not a guaranty of actual construction cost or schedule. Uncertain market conditions such as, but not limited to, local labor or contractor availability, wages, other work, 05/13/2025 C9 971 of 1078
FY2023 R-CAMP Report
Appendix B3
material market fluctuations, price escalations, forc e majeure events and developing bidding conditions, etc. may affect the accuracy of this estimate. Hazen is not responsible for any variance from this Probable Construction Cost Estimate or actual prices and conditions obtained. 05/13/2025 C9 972 of 1078
FY2023 R-CAMP Report
Appendix C1
Appendix C: Project Cost Tables
05/13/2025 C9 973 of 1078
FY2023 R-CAMP Report
Appendix C2
Group Project Number Capital Project Page No.

9.0 Remote Major Rehab Improvement

9.1 Buena Creek Pump Station
BCPS P-37002-001 Minor EI&C Rehabilitation BCPS-1
BCPS P-37002-002 Minor Mechanical Rehabilitation BCPS-2 BCPS P-37002-003 Minor Structural Rehabilitation BCPS-3 BCPS P-37002-004 SCADA Migration BCPS-4
BCPS P-37002-005 Site Safety Improvements BCPS-5
BCPS P-37002-006 Structural Improvement BCPS-6
BCPS P-9.4.004 Major Equipment CIP BCPS-7
BCPS P-9.4.005 Scum and FOG Abatement BCPS-8
BCPS P-9.4.006 Site Security Improvements BCPS-9
BCPS P-9.4.007 Civil Improvement BCPS-10
BCPS S/P-9.4.008 Bypass Study BCPS-11
BCPS P-9.4.009 Mechanical Modifications BCPS-12

9.2 Raceway Basin Pump Station
RBPS P-39002-001 Minor EI&C Rehabilitation RBPS-1
RBPS P-39002-002 Minor Mechanical Rehabilitation RBPS-2 RBPS P-39002-003 Minor Structural Rehabilitation RBPS-3 RBPS P-39002-004 SCADA Migration RBPS-4
RBPS P-39002-005 Site Safety Improvements RBPS-5
RBPS S/P-9.1.006 Containment Basin Repair RBPS-6
RBPS P-9.1.008 Major Equipment CIP RBPS-7
RBPS P-9.1.009 Pump Station Resiliency RBPS-8
RBPS P-9.1.010 Scum and FOG Abatement RBPS-9
RBPS P-9.1.011 Site Security Improvements RBPS-10

9.3 Buena Vista Pump Station
BVPS P-32002-001 Minor EI&C Rehabilitation BVPS-1
BVPS P-32002-002 Minor Mechanical Rehabilitation BVPS-2 BVPS P-32002-003 Minor Structural Rehabilitation BVPS-3 BVPS P-32002-004 SCADA Migration BVPS-4
BVPS P-32002-005 Site Safety Improvements BVPS-5
BVPS P-32002-006 Structural Improvement BVPS-6
BVPS S/P-9.3.008 Major Equipment CIP BVPS-7
BVPS P-9.3.009 Site Security Improvements BVPS-8
BVPS S/P-9.3.010 Facility-Level Alternative Analysis BVPS-9

9.4 Agua Hedionda Lift Station
AHLS P-31002-001 Minor EI&C Rehabilitation AHLS-1
AHLS P-31002-002 Minor Mechanical Rehabilitation AHLS-2 AHLS P-31002-003 Minor Structural Rehabilitation AHLS-3 AHLS P-31002-004 SCADA Migration AHLS-4
05/13/2025 C9 974 of 1078
FY2023 R-CAMP Report
Appendix C3
Group Project Number Capital Project Page No.

AHLS P-31002-005 Site Safety Improvements AHLS-5
AHLS P-31002-006 Replace Spare Grinder AHLS-6
AHLS S-9.2.001 Incompatible Metals AHLS-7
AHLS P-9.2.002 Pump Station D/B Improvement AHLS-8

9.5 Carlsbad Water Recycling Facility
CWRF P-38002-005 Minor Structural Rehabilitation CWRF-1 CWRF P-38002-008 Miscellaneous Service Requests CWRF-2
CWRF P-38002-010 Minor EI&C Rehabilitation CWRF-3
CWRF P-38002-011 Minor Mechanical Rehabilitation CWRF-4 CWRF P-38002-012 Site Safety Improvements CWRF-5
CWRF P-9.5.005 Equalization Basin Water Quality CWRF-6
CWRF S/P-9.5.008 RO Rehabilitation CWRF-7
CWRF S/P-9.5.009 MF Rehabilitation CWRF-8
CWRF S/P-9.5.010 GMF Bypass CWRF-9
CWRF P-9.5.012 Operations and Administration Building
Roof and HVAC CWRF-10
CWRF P-9.5.013 Major Equipment CIP CWRF-11
CWRF S/P-9.5.014 Access between CWRF and CPS CWRF-12
CWRF S/P-9.5.015 Clean-In-Place Chemical Optimization CWRF-13 CWRF S/P-9.5.016 Facility Level Assessment CWRF-14
05/13/2025 C9 975 of 1078
FY2023 R-CAMP Report
BCPS-1
05/13/2025 C9 976 of 1078
FY2023 R-CAMP Report
BCPS-2
05/13/2025 C9 977 of 1078
FY2023 R-CAMP Report
BCPS-3
05/13/2025 C9 978 of 1078
FY2023 R-CAMP Report
BCPS-4
05/13/2025 C9 979 of 1078
FY2023 R-CAMP Report
BCPS-5
05/13/2025 C9 980 of 1078
FY2023 R-CAMP Report
BCPS-6
05/13/2025 C9 981 of 1078
FY2023 R-CAMP Report
BCPS-7
05/13/2025 C9 982 of 1078
FY2023 R-CAMP Report
BCPS-8
05/13/2025 C9 983 of 1078
FY2023 R-CAMP Report
BCPS-9
05/13/2025 C9 984 of 1078
FY2023 R-CAMP Report
BCPS-10
05/13/2025 C9 985 of 1078
FY2023 R-CAMP Report
BCPS-11
05/13/2025 C9 986 of 1078
FY2023 R-CAMP Report
BCPS-12
05/13/2025 C9 987 of 1078
FY2023 R-CAMP Report
RBPS-1
05/13/2025 C9 988 of 1078
FY2023 R-CAMP Report
RBPS-2
05/13/2025 C9 989 of 1078
FY2023 R-CAMP Report
RBPS-3
05/13/2025 C9 990 of 1078
FY2023 R-CAMP Report
RBPS-4
05/13/2025 C9 991 of 1078
FY2023 R-CAMP Report
RBPS-5
05/13/2025 C9 992 of 1078
FY2023 R-CAMP Report
RBPS-6
05/13/2025 C9 993 of 1078
FY2023 R-CAMP Report
RBPS-7
05/13/2025 C9 994 of 1078
FY2023 R-CAMP Report
RBPS-8
05/13/2025 C9 995 of 1078
FY2023 R-CAMP Report
RBPS-9
05/13/2025 C9 996 of 1078
FY2023 R-CAMP Report
RBPS-10
05/13/2025 C9 997 of 1078
FY2023 R-CAMP Report
BVPS-1
05/13/2025 C9 998 of 1078
FY2023 R-CAMP Report
BVPS-2
05/13/2025 C9 999 of 1078
FY2023 R-CAMP Report
BVPS-3
05/13/2025 C9 1000 of 1078
FY2023 R-CAMP Report
BVPS-4
05/13/2025 C9 1001 of 1078
FY2023 R-CAMP Report
BVPS-5
05/13/2025 C9 1002 of 1078
FY2023 R-CAMP Report
BVPS-6
05/13/2025 C9 1003 of 1078
FY2023 R-CAMP Report
BVPS-7
05/13/2025 C9 1004 of 1078
FY2023 R-CAMP Report
BVPS-8
05/13/2025 C9 1005 of 1078
FY2023 R-CAMP Report
BVPS-9
05/13/2025 C9 1006 of 1078
FY2023 R-CAMP Report
AHLS-1
05/13/2025 C9 1007 of 1078
FY2023 R-CAMP Report
AHLS-2
05/13/2025 C9 1008 of 1078
FY2023 R-CAMP Report
AHLS-3
05/13/2025 C9 1009 of 1078
FY2023 R-CAMP Report
AHLS-4
05/13/2025 C9 1010 of 1078
FY2023 R-CAMP Report
AHLS-5
05/13/2025 C9 1011 of 1078
FY2023 R-CAMP Report
AHLS-6
05/13/2025 C9 1012 of 1078
FY2023 R-CAMP Report
AHLS-7
05/13/2025 C9 1013 of 1078
FY2023 R-CAMP Report
AHLS-8
05/13/2025 C9 1014 of 1078
FY2023 R-CAMP Report
CWRF-1
05/13/2025 C9 1015 of 1078
FY2023 R-CAMP Report
Appendix D2
05/13/2025 C9 1016 of 1078
FY2023 R-CAMP Report
Appendix D3
05/13/2025 C9 1017 of 1078
FY2023 R-CAMP Report
Appendix D4
05/13/2025 C9 1018 of 1078
FY2023 R-CAMP Report
Appendix D5
05/13/2025 C9 1019 of 1078
FY2023 R-CAMP Report
Appendix D6
05/13/2025 C9 1020 of 1078
FY2023 R-CAMP Report
Appendix D7
05/13/2025 C9 1021 of 1078
FY2023 R-CAMP Report
Appendix D8
05/13/2025 C9 1022 of 1078
FY2023 R-CAMP Report
Appendix D9
05/13/2025 C9 1023 of 1078
FY2023 R-CAMP Report
Appendix D10
05/13/2025 C9 1024 of 1078
FY2023 R-CAMP Report
Appendix D11
05/13/2025 C9 1025 of 1078
FY2023 R-CAMP Report
Appendix D12
05/13/2025 C9 1026 of 1078
FY2023 R-CAMP Report
Appendix D13
05/13/2025 C9 1027 of 1078
FY2023 R-CAMP Report
Appendix D14
05/13/2025 C9 1028 of 1078
FY2023 R-CAMP Report
Appendix D1
Appendix D: Spare Parts List
05/13/2025 C9 1029 of 1078
FY2023 R-CAMP Report
Appendix D2
05/13/2025 C9 1030 of 1078
FY2023 R-CAMP Report
Appendix D3
05/13/2025 C9 1031 of 1078
FY2023 R-CAMP Report
Appendix D4
05/13/2025 C9 1032 of 1078
FY2023 R-CAMP Report
Appendix E1
Appendix E: Projects Master List
05/13/2025 C9 1033 of 1078
FY2023 R-CAMP Report
Appendix E2
Facility Project Assignment Project Description Responsible Party Project Source BCPS R-CAMP Update Bi-annual update of the R-CAMP report for all remote facilities. EWA 2021 R-CAMP BCPS Grinder Rebuild Provisions for grinder maintenance and rebuild. EWA 2021 R-CAMP BCPS Sewage Pump Rebuild Provisions for sewage pump maintenance and rebuild. EWA 2021 R-CAMP BCPS Sewage Pump Motor
Rebuild Provisions for sewage pump motor maintenance and rebuild. EWA 2021 R-CAMP BCPS Coatings and Paintings Provisions for required facility coating and painting. EWA 2021 R-CAMP BCPS Unplanned Minor
Rehabilitation Provisions for unforeseen maintenance and repair services. EWA 2021 R-CAMP BCPS Integration Assistance Provisions for integration of facility systems. EWA 2021 R-CAMP BCPS VFD Repairs Provisions for required VFD maintenance and repairs. EWA 2021 R-CAMP BCPS Minor EI&C Rehabilitation Tasks associated with potential electrical and instrumentational deficiencies. EWA 2021 R-CAMP BCPS Minor Mechanical
Rehabilitation Tasks associated with potential mechanical deficiencies. EWA 2021 R-CAMP BCPS Minor Structural
Rehabilitation Tasks associated with minor structural rehabilitations to be completed by EWA staff. . EWA 2021 R-CAMP BCPS SCADA Migration Migration of screens to the new SCADA system. EWA 2021 R-CAMP BCPS Site Safety Improvements Tasks associated with improving safety. EWA 2021 R-CAMP BCPS Structural Improvements Tasks associated with potential structural deficiencies to be contracted out by EWA EWA 2021 R-CAMP BCPS Communication
Improvement Repair of the business conduit. EWA 2021 R-CAMP BCPS Major Equipment CIP Tasks associated with large facility component replacement or repair required within the next 5-7 years to be coordinated with future master plans and routinely reassessed. Owner 2021 R-CAMP BCPS Site Security Improvements Tasks associated with improved site access and security. Owner 2021 R-CAMP BCPS Landscaping Improved water meter access via slope improvements and vegetation clearing. Owner 2021 R-CAMP BCPS Scum and FOG Abatement Study to evaluate high FOG and scum loads at pump station influent. Likely options may include anti-scum recirculation or agita te with spray bars. Owner 2021 R-CAMP
BCPS Major Equipment CIP Six of the plug valves have been placed with the seating side of the valve on the unseated side of the system. EWA 2021 R-CAMP & 2021 Site Visit BCPS Minor EI&C Rehabilitation Pilot lights show signs of sun degradation EWA 2021 Condition Assessment BCPS Minor EI&C Rehabilitation Rust present on Nema 3R enclosure Assumed original install year and same amperage 1200A as MCC. Unable to open Nema 3R enclosure, thus unable to verify condition, Mfr, etc. EWA 2021 Condition Assessment BCPS Minor Equipment CIP Based on the comment from the operations the sluice gate is broken and needs to be replaced. EWA 2021 Condition Assessment 05/13/2025 C9 1034 of 1078
FY2023 R-CAMP Report
Appendix E3
Facility Project Assignment Project Description Responsible Party Project Source BCPS Minor
Equipment/Structural CIP Move "working door" on north side of building to other side to allow full operation of door and scum pumping activities. EWA 2021 EWA Staff BCPS Work Order Repair door frame on west side EWA 2021 EWA Staff BCPS Major Equipment CIP Pump 1 and 2 suction valves leak-by and need to be replaced Owner 2021 EWA Staff BCPS Minor Structural
Rehabilitation Install stairs up to the SDG&E cabinet from the lower level EWA 2021 EWA Staff BCPS Site Safety Improvements Add forced air ventilation to containment basin structure EWA 2021 EWA Staff BCPS Site Safety Improvements Purchase lockout devices (application specific) in sufficient quantity to lock out wheel valves and ball valves throughout facility EWA 2021 EWA Staff BCPS Site Safety Improvements Install motion sensor lighting for all rooms/ indoor areas EWA 2021 EWA Staff BCPS Site Security Improvements Pump station is in a vulnerable location and close to vegetation that presents a risk of fire. Consider installation of rooftop sprinkler system with remote activation functionality (SCADA integration or auto dialer) to protect station from embers in the event of a fire. Owner 2021 EWA Staff BCPS Pressure Transducer
Replacement
Replace 2 of the Pressure Transducers that deal with Levels. The current setup is bulky and can fault out when rags get entangl ed on the sensor this can result in faulty inaccurate readings. Replacing with a Vega Pressure transducer will help to eliminate these faulty reading due to the sleek design that is capable of being put down a slotted holed stainless-steel tube, thus keeping rags out of the readings.

EWA 2021 EWA Staff
BCPS SCADA Integration Make EWPCF, CWRF, and Pump Station SCADA available in MCC EWA 2021 EWA Staff BCPS Bypass Pump System
Installation Install an appropriately sized bypass pump system. Do not use the plans from CIP No. 8300. Develop from new with EWA input. EWA 2021 EWA Staff BCPS Notify Jif Pak has large tanks in an outside area adjacent to easement gate. Require Jif Pak to contain contents of tank to prevent spill from reaching storm drain or pump station down the hill. 2021 EWA Staff BCPS Mirror Acquisition &
Installation Install a convex mirror at bottom of easement hill to see opposing traffic around the corner (view blocked by vegetation). EWA 2021 EWA Staff BCPS Guardrail Acquisition &
Installation Install a guardrail around storm drain on easement road to pump station from Jif Pak. Owner 2021 EWA Staff BCPS Shade Acquisition &
Installation Put a shade/ rain structure over the SDG&E cabinet to avoid water intrusion when door is open during wet weather. EWA 2021 EWA Sta ff BCPS Landscaping for Fire
Protection Remove landscaping within the station fence line to prevent the spread of wildfire, vectors, and improve aesthetics Owner 2021 EWA Staff BCPS Programming Add programming to send alarm to SCADA to elicit an Operator response to prevent pump from running with check valve closed for extended period of time. EWA 2021 EWA Staff
BCPS
Remotely Controlled Gate
System Acquisition &
Installation
Modify station vehicle entry gate to automatic with remote Owner 2021 EWA Staff BCPS Fire Hydrant Acquisition &
Installation
Add fire hydrant near station (Owner and VID project) ES-75: NFPA on all the buildings and the direction that fire response to be.

No fire hydrant nearby. Would be nice to have some remotely controlled fire suppression system. No alarms that go off that go off in case of fire.

Owner 2021 EWA Staff & Site Visit
BCPS Isolation Gate Repair East/ West wet well isolation gate is seized and in need of repair ES-54: Wet well isolation gate should be sized up Owner 2021 EWA Staff & Site Visit BCPS Overflow Storage Lid
Replacement Replace overflow storage lids and locking mechanisms ES-53: Lid at overflow basin needs to be replaced. EWA 2021 EWA Staff & Site Visit BCPS Awning Acquisition &
Installation
Install an awning over the generator walkway and doors to protect equipment from rain intrusion. ES-55: Awning on the SDG&E and generator / protect against rain EWA 2021 EWA Staff & Site Visit 05/13/2025 C9 1035 of 1078
FY2023 R-CAMP Report
Appendix E4
Facility Project Assignment Project Description Responsible Party Project Source BCPS Davit Arm Acquisition &
Installation
Add davit arm to overflow containment basin for worker recovery ES-53: Lid at overflow basin needs to be replaced.

Recommended a davit arm and ventilation fan. The structure is maintained manually. EWA 2021 EWA Staff & Site Visit BCPS Drainage Improvements
During rain events, water comes down the slope next to the stairs and comes into the building, sandbags are used to deflect water away from the doorway. install a French drain, rip rap as needed, and adjust size of curbing as needed next to stairs to prevent water intrusion into building. ES-57: French drain to prevent dirt from going in the building EWA 2021 EWA Staff & Site Visit
BCPS Paving and Lighting
Pave or otherwise improve vehicle pathway from Melrose gate to pump station. Motion activated street lighting should be considered. Project could be done in conjunction with parks department to add a bike/ walking path. ES-62: Nice to have pathway light and the access road is hard to drive when it rains Owner 2021 EWA Staff & Site Visit
BCPS Roof Repair Roof is leaking EWA 2021 Site Visit
BCPS Manhole Improvement A manhole cover with full protection is nice. An engineered manhole cover, 36-inch manhole with protective cover. EWA 2021 Site Visit BCPS Platform Addition Platform to read H2S concentration at the odor scrubber. EWA 2021 Site Visit RBPS Landscaping Clear brush around station perimeter to maintain a fire break on routine basis. Owner 2021 R-CAMP RBPS Major Equipment CIP Tasks associated with large facility component replacement or repair required within the next 5-7 years to be coordinated with future master plans and routinely reassessed. Owner 2021 R-CAMP RBPS Site Security
Improvements Tasks associated with improved site access and security. Owner 2021 R-CAMP RBPS Containment Basin Repair Perform a study and to develop improvements for the Containment Basin groundwater infiltration. Owner 2021 R-CAMP RBPS Pump Station Resiliency Investigation of a method of protection for the station SDG&E cabinet and other key assets from potential flooding from the nearby creek. Owner 2021 R-CAMP
RBPS Scum and FOG Abatement Study to evaluate high FOG and scum loads at pump station influent. Owner 2021 R-CAMP RBPS R-CAMP Update Bi-annual update of the R-CAMP report for all remote facilities. EWA 2021 R-CAMP RBPS Minor EI&C Rehabilitation Tasks associated with potential electrical and instrumentational deficiencies. EWA 2021 R-CAMP RBPS Minor Mechanical
Rehabilitation Tasks associated with potential mechanical deficiencies. EWA 2021 R-CAMP RBPS Minor Structural
Rehabilitation Tasks associated with minor structural rehabilitations to be completed by EWA staff. EWA 2021 R-CAMP RBPS SCADA Migration Migration of screens to the new SCADA system. EWA 2021 R-CAMP RBPS Site Safety Improvements Tasks associated with improving safety. EWA 2021 R-CAMP RBPS Grinder Rebuild Provisions for grinder maintenance and rebuild. EWA 2021 R-CAMP RBPS Sewage Pump Rebuild Provisions for sewage pump maintenance and rebuild. EWA 2021 R-CAMP RBPS Sewage Pump Motor
Rebuild Provisions for sewage pump motor maintenance and rebuild. EWA 2021 R-CAMP RBPS Coatings and Paintings Provisions for required facility coating and painting. EWA 2021 R-CAMP 05/13/2025 C9 1036 of 1078
FY2023 R-CAMP Report
Appendix E5
Facility Project Assignment Project Description Responsible Party Project Source RBPS Unplanned Minor
Rehabilitation Provisions for unforeseen maintenance and repair services. EWA 2021 R-CAMP RBPS Integration Assistance Provisions for integration of facility systems. EWA 2021 R-CAMP RBPS VFD Repairs Provisions for required VFD maintenance and repairs. EWA 2021 R-CAMP RBPS Minor EI&C Rehabilitation Ultrasonic Level Sensor and Wet Well Level Indicating Transmitter and Pressure Transducer EWA 2021 Condition Assessment RBPS SCADA Migration integration of generator "not in auto" alarm to SCADA if any condition prevents generator from starting automatically (breaker open, switch not in auto) EWA 2021 EWA Staff
RBPS Site Safety Improvements Purchase lockout devices (application specific) in sufficient quantity to lock out wheel valves and ball valves throughout facility EWA 2021 EWA Staff RBPS Site Security
Improvements Install motion sensor lighting inside MCC EWA 2021 EWA Staff RBPS Landscaping
pump station is in a vulnerable location and close to vegetation that presents a risk of fire. while efforts are made to maintain defensible space the from the adjacent vegetation it may not be adequate to protect against embers. consider installation of rooftop sprinkler system with remote activation functionality (scada integration or auto dialer).

Owner 2021 EWA Staff
RBPS Minor EI&C Rehabilitation Put overflow grinder on level control to auto-start. EWA 2021 EWA Staff RBPS SCADA Migration Make EWPCF, CWRF, and Pump Station SCADA available in MCC EWA 2021 EWA Staff RBPS Containment Basin Repair Recoat containment basin. Prevent groundwater intrusion. EWA 2021 EWA Staff RBPS Site Security
Improvements Modify main station entry gate to open automatically with remote EWA 2021 EWA Staff & Site Visit RBPS Landscaping Memorialized the need for the Owners to budget for and maintain landscaping at least annually. Need to maintain defensible space and keep vegetation away from fence and building. Owner 2021 EWA Staff & Site Visit RBPS Landscaping Remove plants from Melrose driveway to allow for visibility of oncoming traffic, or replant with ground cover or plant with low height. Owner 2021 EWA Staff & Site Visit
RBPS Minor EI&C Rehabilitation Like to have level controls on the grinders to be able to tell whether or not they are working remotely. Grinder and overflow grinder, like to get it on level control to auto start. EWA 2021 Site Visit RBPS Minor Equipment CIP Very little pressure on hose bib like to get a pump EWA 2021 Site Visit RBPS Site Security
Improvements No camera towards the basin Owner 2021 Site Visit RBPS Minor Structural
Rehabilitation The water in the creek gets close to the SDG&E cabinets like to have a barrier wall. Could be a 3-ft wall around the fence. EWA 2021 Site Visit RBPS Minor Equipment CIP Like to connect the drain piping to the wet well EWA 2021 Site Visit RBPS Minor EI&C Rehabilitation Nice to have controls to remotely turn on overflow grinder. EWA 2021 Site Visit RBPS Minor Equipment CIP Plug valves are backwards EWA 2021 Site Visit BVPS Site Security Improvements Tasks associated with improved site access and security. Owner 2021 R-CAMP BVPS Buena Vista Pump Station
Replacement Feasibility and planning study to assess replacing the existing BVPS with a new pump station in the next 8-10 years. Owner 2021 R-CAMP 05/13/2025 C9 1037 of 1078
FY2023 R-CAMP Report
Appendix E6
Facility Project Assignment Project Description Responsible Party Project Source BVPS R-CAMP Update Bi-annual update of the R-CAMP report for all remote facilities. EWA 2021 R-CAMP BVPS Minor EI&C Rehabilitation Tasks associated with potential electrical and instrumentational deficiencies. EWA 2021 R-CAMP BVPS Minor Mechanical
Rehabilitation Tasks associated with potential mechanical deficiencies. EWA 2021 R-CAMP BVPS Minor Structural
Rehabilitation Tasks associated with minor structural rehabilitations to be completed by EWA staff. EWA 2021 R-CAMP BVPS SCADA Migration Migration of screens to the new SCADA system. EWA 2021 R-CAMP BVPS Site Safety Improvements Tasks associated with improving safety. EWA 2021 R-CAMP BVPS Structural Improvements Tasks associated with potential structural deficiencies to be contracted out by EWA. EWA 2021 R-CAMP BVPS Grinder Rebuild Provisions for grinder maintenance and rebuild. EWA 2021 R-CAMP BVPS Sewage Pump Rebuild Provisions for sewage pump maintenance and rebuild. EWA 2021 R-CAMP BVPS Sewage Pump Motor
Rebuild Provisions for sewage pump motor maintenance and rebuild. EWA 2021 R-CAMP BVPS Coatings and Paintings Provisions for required facility coating and painting. EWA 2021 R-CAMP BVPS Unplanned Minor
Rehabilitation Provisions for unforeseen maintenance and repair services. EWA 2021 R-CAMP BVPS Integration Assistance Provisions for integration of facility systems. EWA 2021 R-CAMP BVPS VFD Repairs Provisions for required VFD maintenance and repairs. EWA 2021 R-CAMP BVPS Major Equipment CIP Tasks associated with large facility component replacement or repair required within the next 5-7 years to be coordinated with future master plans and routinely reassessed. Owner 2021 R-CAMP BVPS Minor EI&C Rehabilitation
Asset expected to be removed based on the CIP progress tracker FY2021. Control panel has uncovered opening, likely from removed pilot device/light. Bunker control panels are maintenance intensive, Encina prefers ultrasonic or radar level detection, due to improvements in technology this also applies to the wet well bubbler panel EWA 2021 Condition Assessment
BVPS Minor EI&C Rehabilitation Panelboard shows signs of corrosion. Revise to an electrical asset as this is a Panelboard. EWA 2021 Condition Assessment BVPS Major Equipment CIP Corrosion present at top of section. Section is a main switch, technically not a breaker as there is no tripping device/unit EWA 2021 Condition Assessment BVPS Work order MCC shows signs of corrosion on enclosure Nameplate on MCC shows MCC-1, recommend revising asset name EWA 2021 Condition Assessment BVPS Major Equipment CIP
Transformer-Lighting PNLC - Located in MCC-1. Corrosion present on MCC-1 enclosure. Revised install dated to 1994 based on record drawings Size based on single line, unable to open MCC cabinet to confirm details of transformer. And Transformer-Lighting

PNL MCC
EWA 2021 Condition Assessment
BVPS Major Equipment CIP? AHU-Motor & Pump Room (entire fan assembly) Owner 2021 Condition Assessment BVPS Minor Equipment CIP Fan- Circulating - Motor Room - Signs of corrosion Change Asset ID to M-9750-000 EWA 2021 Condition Assessment 05/13/2025 C9 1038 of 1078
FY2023 R-CAMP Report
Appendix E7
Facility Project Assignment Project Description Responsible Party Project Source BVPS Minor EI&C Rehabilitation
Dry Well - 2 level switches connected to a common repeater. 1 level switch in engine room. 1 level switch in pump room.

Switch-Low Level (air gap tank) – Corrosion - Switch-high Level (GENRMSUMP) - Unsure of install year. Unable to visually inspect as float is in sump. No good “size info” present - Level Switch Tank-Receiver-Air to Hydro - Conduit knockout has separated from instrument and created opening in instrument - Level Switch, Surge Tank - Integral to the surge tank - Pressure Switch Sewage Pump Sealwater - Not connected to seal water, not being used - Pressure Switch, Compressor Shut off - Integral to Bubbler panel, PNL-9800-000 - Pressure Switch, Bubbler Control - Asset expected to be removed based on the CIP progress tracker FY2021. Integral to Bubbler panel, PNL-9800-001 - Pressure Switch (2) - Integral to Bubbler panel, PNL-9800-002 and the other is integral to 9800-003
EWA 2021 Condition Assessment
BVPS Minor EI&C Rehabilitation Pump 1 and 2 Pressure Transmitter - Unable to confirm size or year of install as is mounted on pipe 20’ above floor EWA 2021 Condition Assessment BVPS Minor Equipment CIP 2" Backflow @ Duck Pond - Unable to locate and field verify. EWA 2021 Condition Assessment BVPS Major Equipment CIP Sluice Gate- Wet well - We were not able to access the Wet well. EWA 2021 Condition Assessment BVPS Minor Equipment CIP Solenoid Valve Tank Receiver – Air to hydro pneumatic & solenoid valve, Surge tank air inlet & solenoid valve, Surge tank air vent EWA 2021 Condition Assessment BVPS SCADA Migration Integration of generator "not in auto" alarm to scada if any condition prevents generator from starting automatically (breaker open, switch not in auto) EWA 2021 EWA Staff
BVPS Site Safety Improvements Add ladder cage on east ladder on barrel roof near the hydraulic room EWA 2021 EWA Staff BVPS Major Equipment CIP
Evaluate if the elevation of the creek berm is enough to protect the station from a significant storm event similar or greater than the storm on April 10, 2020. During that rain event water was at the top of the berm and broke upstream of the station, which caus ed flooding of Oceanside's pump station and freeway. If April 10, 2020, would have been a high tide the water would possibly have crested the berm into the station. Berm improvements have been completed upstream of BVPS where the berm broke during that storm, so the concern is that the weak spot may be at our station Owner 2021 EWA Staff
BVPS Landscaping Memorialized the need for the Owners to budget for and maintain landscaping at least annually Owner 2021 EWA Staff BVPS Site Safety Improvements Purchase lockout devices (application specific) in sufficient quantity to lock out wheel valves and ball valves throughout facility ES-5: Buy the whole lockout set. EWA 2021 EWA Staff
BVPS Site Safety Improvements Install motion sensor lighting for all rooms/ indoor areas EWA 2021 EWA Staff BVPS SCADA Migration Make EWPCF, CWRF, and Pump Station SCADA available in MCC ES-15: No SCADA in the stations. Would be nice to have. EWA 2021 EWA Staff BVPS Minor EI&C Rehabilitation Add a zero-speed sensor to the grinder so that if the grinder does not operate as expected when called to run then an alarm will be sent to SCADA. EWA 2021 EWA Staff
BVPS Minor Equipment CIP Sewage pump discharge valves are overhead and difficult to reach, modify valve with chain or MOV valve. Automation/ remote operation of force main valves from HMI. ES-12: Converting manual valve to chain operated valves EWA 2021 EWA Staff & Site Visit BVPS Landscaping Remove eucalyptus tree that is near the Jefferson Street roadway and is overhanging the air gap tank. ES-4: Tree should be removed.

Once the tree is removed the soil needs to be retained. Owner 2021 EWA Staff & Site Visit BVPS Minor Structural
Rehabilitation Put a shade/ rain structure over the SDG&E cabinet to avoid water intrusion when door is open during wet weather. EWA 2021 EWA Staff & Site Visit BVPS Minor Structural
Rehabilitation
Install safety grating on the grinder skylight doors - ES-17: The wet well skylight needs a solution for fall protection. Much larger than the ether skylights EWA 2021 EWA Staff & Site Visit BVPS Major Equipment CIP
Consider upgrading the generator system to a natural gas-powered unit when considering "new BVPS". APCD regulations are expected to become more stringent and diesel-powered units my require stringent monitoring and/ or may be unable to be permitted based on new standards. ES-9: More stringent air quality is coming. Preference is to convert to gas generators Owner 2021 EWA Staff & Site Visit
BVPS Minor Equipment CIP One of the pumps recently ragged up. Two pumps are [in] operation all the time out of 4. Only one spare pump is available.

Currently running pump 2. Pumps due for repair waiting for the pump to come back from shop. Pump 1 _ mechanical seal is broken. EWA 2021 Site Visit 05/13/2025 C9 1039 of 1078
FY2023 R-CAMP Report
Appendix E8
Facility Project Assignment Project Description Responsible Party Project Source BVPS Minor Equipment CIP Seal water system is out. Currently using different seal system (ask Steve C.) seems to be working fine EWA 2021 Site Visit BVPS Minor Structural
Rehabilitation Roof of MCC room is still leaking. Also leaking in the generator room. EWA 2021 Site Visit BVPS Minor Structural
Rehabilitation Item 3 - Flooding could overwhelm the pumps entry from inlet next to the fence into the wet well EWA 2021 Site Visit BVPS Minor EI&C Rehabilitation Level indicators for the tanks. They can repurpose the signal wire but still need 120-volt rewiring. Both of the tanks. EWA 2021 Site Visit BVPS Minor EI&C Rehabilitation Grinder, had leaks on the hydraulics and failed - needs a sensor to identify when it stops EWA 2021 Site Visit BVPS Site Security Improvements Item 14 - Adding a second fence to try to contain entry into basin. Fencing needs upgrade. It collects a lot of debris. The fencing gets cut through. CA-9: Signs of significant H2S corrosion in areas contacting the soil. Owner 2021 Site Visit & Condition Assessment
AHPS SCADA Migration Integration of generator "not in auto" alarm to scada if any condition prevents generator from starting automatically (breaker open, switch not in auto) EWA 2021 EWA Staff
AHPS Site Security Improvements
Install a tall, small-mesh security fencing with inward and outward facing angle at top that also extends below the bridge roadway deck to cover the pipe bridge below to prevent people from climbing and jumping from bridge and mitigate AHLS/ NRG site security concerns.

Owner 2021 EWA Staff
AHPS Site Safety Improvements Install lighted exit signs for all exits EWA 2021 EWA Staff AHPS Coatings and Paintings Paint all outdoor PVC pipes that are susceptible to or have already been impacted by UV oxidation or put a sunshade over the area. EWA 2021 EWA Staff AHPS Site Safety Improvements Install motion sensor lighting for all rooms/ indoor areas EWA 2021 EWA Staff AHPS SCADA Migration Make EWPCF, CWRF, and Pump Station SCADA available in MCC EWA 2021 EWA Staff AHPS Site Safety Improvements
At the grinder building, modify the grinder isolation gates so that they may be opened and closed from the grinder building roof.

The gates must be able to be locked from unauthorized use. All other equipment will be moved outside during AHLS completion project. moving the gate actuators to the roof will allow for quicker response and keep staff out of a confined space area.

EWA 2021 EWA Staff
AHPS Coatings and Paintings
Build a wall behind or enclose the SDG&E cabinet to protect enclosure from ocean air and protect cabinet from corrosion. Paint and protect cabinet to mitigate surface corrosion present on cabinet. Install a shade/ rain protection structure over cabinet to prevent water intrusion when door is open in wet weather.

EWA 2021 EWA Staff
AHPS Minor Structural
Rehabilitation
Build a wall behind or enclose the SDG&E cabinet to protect enclosure from ocean air and protect cabinet from corrosion. Install a shade/ rain protection structure over cabinet to prevent water intrusion when door is open in wet weather. EWA 2021 EWA Staff AHPS Minor Equipment CIP Acquire critical spares of the wet well bubbler compressors EWA 2021 EWA Staff AHPS Minor Structural
Rehabilitation
Modify wet well roof hatch to provide inspection hatch to allow for easy inspection and atmospheric monitoring without the need to remove the entire panel/ hatch and eliminate need for fall protection. EWA 2021 EWA Staff AHPS Minor Structural
Rehabilitation Purchase a rolling platform for AHLS pump room to accommodate maintenance of overhead equipment. EWA 2021 EWA Staff AHPS Minor Structural
Rehabilitation Add platform to access educator equipment for maintenance and testing of equipment. EWA 2021 EWA Staff AHPS Minor EI&C Rehabilitation
The grinder building supply fan LOR switch is located within a confined space, please move the switch outside of the grinder building. One can't enter the space if the atmosphere is poor to start the fan, but the fan must be on to make the atmosphere acceptable to enter ES-35: The inlet structure - the on/off switch is inside the structure EWA 2021 EWA Staff & Site Visit
AHPS Site Safety Improvements
There is no cellular phone reception inside of the AHLS building. It is a critical safety concern to ensure that cellular phones and GPS systems work inside the building. Please install a booster system to ensure that cellular signals are achievable everywhere within the building. This needs to be compatible with the Blackline Safety Loner system. ES-42: MCCBCCToom - No cellphone reception. No infrastructure is [illegible] $50k. Communication is lacking in the station EWA 2021 EWA Staff & Site Visit
05/13/2025 C9 1040 of 1078
FY2023 R-CAMP Report
Appendix E9
Facility Project Assignment Project Description Responsible Party Project Source AHPS Site Safety Improvements Install battery powered emergency lighting in pump room, motor room, generator room, and MCC ES-43: Interior of building emergency lights not working EWA 2021 EWA Staff & Site Visit AHPS Site Safety Improvements Purchase lockout devices (application specific) in sufficient quantity to lock out wheel valves and ball valves throughout facility. ES- 47: Wholesale purchase of lockout devices for all the stations. EWA 2021 EWA Staff & Site Visit AHPS Site Security Improvements
Modify the north access bridge gates to allow for multiple agency locks to be used and accessed from either side of the gates. the chain and locks in place now are only accessible from one side of the gate making access to bridge difficult. Bridge access is used for emergency response if NRG route is inaccessible. ES-32: The locks should be modified to allow multiple people accessing on both sides
EWA 2021 EWA Staff & Site Visit
AHPS Minor EI&C Rehabilitation Install inline air flow monitoring equipment into the Humidifier feed line to ensure that proper air balance is achieved (Design flow is ≥ 8,300 SCFM) - ES-37: Also, inline air flow meter would like to get either an airflow monitor handheld or inline flowmeter EWA 2021 EWA Staff & Site Visit AHPS SCADA Migration Wet Well Miltronic units need programming to match bubbler pump controls (interlocks) if selected as primary. EWA 2021 EWA Staff & Site Visit AHPS Minor Equipment CIP ES-49: Seal water issue. EWA 2021 EWA Staff & Site Visit AHPS Minor EI&C Rehabilitation
Site security needs to be improved. Camera system should be evaluated to ensure that there are no blind spots, fencing needs to be improved to make it harder to cut and breach, and lighting should be improved throughout the facility to allow cameras to see clearly at night and to discourage unauthorized access. Camera feed should be viewable from EWPCF control room. ES-41: Not enough cameras. One camera and would be nice to look at transfer switch ES-31: Fencing the fencing is out. People using bridge to jump concern about people intruding they want them outside of the. ES-33: Memorialize in R-CAMP the fencing and bridge concern and the proposed solution
EWA 2021 EWA Staff & Site Visit
AHPS Minor Structural
Rehabilitation Provide several quick-connect adapters for hose bibbs. ES-25: Looking for quick connect fittings on hose bibs EWA 2021 EWA Staff & Site Visit AHPS Minor Equipment CIP Assess station for incompatible metals throughout facility and resolve. ES-28: Incompatible metals - recommended by KJ stainless steel and flanged iron Owner 2021 EWA Staff & Site Visit AHPS Minor Equipment CIP Only have access to 4 pumps. The other 4 pumps after 20 mins the output goes to 0. Currently replacing those impellers to test. EWA 2021 Site Visit AHPS Site Safety Improvements Grid system or ladder for media filter. They need to get in there _ DB said they want to take that on but not sure. Looking for a platform to be able to walk on it. EWA 2021 Site Visit
AHPS Minor Structural
Rehabilitation A sunshade or cover to stop vegetation growth EWA 2021 Site Visit AHPS Site Safety Improvements There is an engulfment hazard on the media. DB is looking at that. DB is proposing a step and a mat. EWA 2021 Site Visit AHPS Minor Equipment CIP Media - Access hatches are not sealed. EWA 2021 Site Visit AHPS Minor Structural
Rehabilitation Protection for skylights and hatch EWA 2021 Site Visit AHPS Minor Structural
Rehabilitation
Item 5 - Sluicegate for the wet well, modify so [illegible] enough and [illegible] so they can insert equipment for inspection and also insert equipment EWA 2021 Site Visit
AHPS Minor Structural
Rehabilitation Replace plank with platform for access to actuators on lift pumps EWA 2021 Site Visit AHPS Minor Structural
Rehabilitation
Roof drains are going to stormwater basin. If something leaks on the roof, they won't know about it until they visit the statio n next time. EWA 2021 Site Visit
AHPS Minor Equipment CIP Manhole for FM bypass, it is just flanged, and it is not functioning as station bypass. They need to bypass the station to use station bypass. There are no valves. They have to do confined space entry to access the FM drain. EWA 2021 Site Visit AHPS Minor EI&C Rehabilitation Moving the operations of grinders control panels and gate actuators on the roof of the inlet structure EWA 2021 Site Visit AHPS Minor Structural
Rehabilitation Odor control - Shade structure/recommends pvc piping to be coated EWA 2021 Site Visit 05/13/2025 C9 1041 of 1078
FY2023 R-CAMP Report
Appendix E10
Facility Project Assignment Project Description Responsible Party Project Source AHPS Minor Equipment CIP Need one more pump for redundancy on the recirculation pump. Having redundancy provides better stewardship of water. EWA 2021 Site Visit AHPS Minor EI&C Rehabilitation
Generator Disconnect: very critical if someone opens that it will disconnect the generator. No redundancy in the system if it gets disconnected no way of saying it is out. Need to allow for generator out or an alarm for disconnect cabinet. Generator fuel lev el not working. Generator exhaust next to HVAC intake /DB is taking care of it.

EWA 2021 Site Visit
AHPS Minor Structural
Rehabilitation Fuel piping needs a ramp to avoid stepping over EWA 2021 Site Visit AHPS Minor EI&C Rehabilitation No redundancy on bubbler control DB is looking at it. EWA 2021 Site Visit AHPS Minor Structural
Rehabilitation Garden hose going out of the access rollup door EWA 2021 Site Visit AHPS Minor EI&C Rehabilitation No flow meter Bypass. Not part of DB. EWA 2021 Site Visit AHPS Site Safety Improvements There might be a safety report that identified the need for safety items. A large purchase of items with annual budget for replacement. EWA 2021 Site Visit
AHPS Minor Equipment CIP Seal water goes out the station goes out. Improve to Mechanical Seals EWA 2021 Site Visit AHPS Minor Equipment CIP Jim Crane - recommended by pump manufacturer. Need something like power jack to lift pumps. EWA 2021 Site Visit AHPS Minor EI&C Rehabilitation Light switches, the conduit leaks/ leaks through cabinets every time it rains it leaks EWA 2021 Site Visit CWRF R-CAMP Update Bi-annual update of the R-CAMP report for all remote facilities. EWA 2021 R-CAMP CWRF
Operations and
Administration Building
Roof and HVAC
Performance of visual inspection, identification of repairs, and implementation of roof and HVAC system. Owner 2021 R-CAMP CWRF Major Equipment CIP UF Membrane Replacement - Tasks associated with large facility component replacement or repair required within the next 5-7 years to be coordinated with future master plans and routinely reassessed. Owner 2021 R-CAMP CWRF Reverse Osmosis
Decommissioning Tasks associated with storing and maintaining the RO System for potential future use. EWA 2021 R-CAMP CWRF Microfiltration System
Decommissioning Tasks associated with storing and maintaining the MF System for potential future use. EWA 2021 R-CAMP CWRF Sodium Hypochlorite
Improvements Address tank and metering system deficiencies. EWA 2021 R-CAMP CWRF Minor Structural
Rehabilitation Tasks associated with minor structural rehabilitations to be completed by EWA staff. EWA 2021 R-CAMP CWRF Structural Improvements Tasks associated with potential structural deficiencies to be contracted out by EWA. EWA 2021 R-CAMP CWRF Miscellaneous Service
Requests Address miscellaneous minor deficiencies noted during the site assessment in January 2019. EWA 2021 R-CAMP CWRF SCADA Improvements Maintain and upgrade the CWRF's existing SCADA system until replacement and standardization occurs. EWA 2021 R-CAMP CWRF Minor EI&C Rehabilitation Tasks associated with potential electrical and instrumentational deficiencies. EWA 2021 R-CAMP CWRF Minor Mechanical
Rehabilitation Tasks associated with potential mechanical deficiencies. EWA 2021 R-CAMP 05/13/2025 C9 1042 of 1078
FY2023 R-CAMP Report
Appendix E11
Facility Project Assignment Project Description Responsible Party Project Source CWRF Site Safety Improvements Tasks associated with improving safety. EWA 2021 R-CAMP CWRF Equalization Basin
Settlement Mitigate the settlement occurring around the EQ Basin EWA 2021 R-CAMP CWRF Coatings and Paintings Provisions for required facility coating and painting. EWA 2021 R-CAMP CWRF Unplanned Minor
Rehabilitation Provisions for unforeseen maintenance and repair services. EWA 2021 R-CAMP CWRF Integration Assistance Provisions for integration of facility systems. EWA 2021 R-CAMP CWRF VFD Repairs Provisions for required VFD maintenance and repairs. EWA 2021 R-CAMP CWRF RO Rehabilitation RO system is recommended to be decommissioned per Project P-38002-001. Will include the rehabilitation and replacement required to recommission the RO system Owner 2021 R-CAMP CWRF MF Rehabilitation MF system is being decommissioned per Project P-38002.002. But capacity still exists in the CWRF permit in the event that CMWD. Owner 2021 R-CAMP
CWRF Clean-In-Place Chemical
Optimization Study to evaluate the optimal size of the CIP storage tanks to reduce the frequency of chemical deliveries. EWA 2021 R-CAMP CWRF Equalization Basin Water
Quality Study to evaluate methods to promote improved water quality within the EQ Basin. Owner 2021 R-CAMP CWRF GMF Bypass Study on installing a new off-spec pipeline from the GMF effluent to bypass the CCBCCT and return directly to the EWPCF. Owner 2021 R-CAMP CWRF Irrigation and Landscaping The landscaping around CWRF can be improved to beautify the area and promote the use of recycled water. Owner 2021 R-CAMP CWRF Minor Mechanical
Rehabilitation Chlorine Injector Mixer / CCT - M-1001-1 - Loud noise produces by the motor when operation. It seems operational issue EWA 2021 Condition Assessment CWRF GMF Media Replacement Granular Media Filtration Unit # 1 / N - GMF-0805-1 & # 2 / S - GMF-0805-2 - Sand filter media is close to the end of life. EWA 2021 Condition Assessment CWRF Work Order Sodium Hypo Calibration Column - FQG-0961 & Sodium Bisulfite Calibration Column - FQG-0964 - Needs to be cleaned or replaced. EWA 2021 Condition Assessment
CWRF Minor EI&C
Rehabilitation? MF/UF Pressure Indicating Transmitter - PIT-0901-5B - Sign of Corrosion EWA 2021 Condition Assessment CWRF Minor Mechanical
Rehabilitation GMF Static Mixer - MXR-0803 - EWA 2021 Condition Assessment CWRF
Critical Sapres for
BFVsand Address as Work
Orders
UF Inlet Flow Control Valve - BFV-0931-1 - Due for replacement. Does not respond to SCADA command according to eMaint records. Coating failed and signs of heavy corrosion. UF DRAIN VALVE - BFV-0931-14 - Flange broken. Valve coating failed and signs of corrosion. UF Inlet Flow Control Valve - BFV-0932-1 - Coating failure. Signs of corrosion. The valve is seized in closed position. Planned to be replaced. UF Drain Valve - BFV-0932-14 - Broken Flange. Coating failure. Signs of corrosion. GMF Feed Pump 2 Airvac - Leak causing corrosion on the flange
EWA 2021 Condition Assessment
CWRF Minor Mechanical
Rehabilitation Sodium Hypochlorite Metering Pump 3 - P-1101-3 - The motor produce noise and seems to have operational issue. EWA 2021 Condition Assessment CWRF Coatings and Paintings Safety shower - Severe corrosion. Coating needed EWA 2021 Condition Assessment CWRF Work Order Lighting of the site - The site lighting doesn’t work and needs immediate attention. The poles look to have a good condition. & Lighting of chemical skid area - Some of the lamps do not work. EWA 2021 Condition Assessment CWRF Minor Mechanical
Rehabilitation Air scour piping - Sign of severe corrosion on pipe body, welding and connection lines along the pipeline EWA 2021 Condition Assessment 05/13/2025 C9 1043 of 1078
FY2023 R-CAMP Report
Appendix E12
Facility Project Assignment Project Description Responsible Party Project Source CWRF Minor Mechanical
Rehabilitation GMF Feed Pump 2 Airvac - Leak causing corrosion on the flange EWA 2021 Condition Assessment CWRF Work Order Purchase chemical resistant gauntlet gloves, boots, pants, and jacket in med, large, XL sizes to store onsite. EWA 2021 EWA Staff CWRF SCADA Migration
Provide a centrally located field access to CWRF SCADA. An Ideal location for the SCADA screen would be in the area near the UF outside MCC. Screen must be protected from environmental elements and secured from unauthorized use in accordance with homeland security and EWA's safety/ security standards.

EWA 2021 EWA Staff
CWRF More an ECAMP project
UF/ MF pumps require seal water to operate. Seal water is supplied via EWPCF 3whp. EWPCF frequently has 3whp variations in availability of supply, pressure, and turbidity. The 3water system at EWPCF is heavily taxed and has caused operability issues for the heat dryer. Consider use CWRF's reclaim water supply located at East Storage Basin to supply UF/ MF seal water system as the primary supply and retain EWPCF 3whp as a redundant system. obtain any permits as required for title 22 usage or investigate if permits is required as it would be used exclusively for CMWD's benefit on their recycled water supply system. alternatively, a booster pump or hydropneumatic tank could be used to ensure adequate pressure is available for seal water. Hazen proposes an alternative solution to provide the seal water through each individual pump heads.

EWA 2021 EWA Staff
CWRF
Operations and
Administration Building
Roof and HVAC
Install air conditioner in UPS/ circuit breaker room at the CWRF admin building to improve environment for electronics and improve air circulation. The room is not environmentally control which has caused periodic premature failure of the UPS unit.

ES-105: Server room, air conditioning
Owner 2021 EWA Staff
CWRF Minor Mechanical
Rehabilitation
Install solenoid valves on the air supply to the GMF air lift manifold and programming to GMF influent trough valves to allow th e air supply and influent valves work together to allow air supply to stop when the filter influent valve is closed to prevent dirty sand from cycling and increasing the time needed to flush the unit.

EWA 2021 EWA Staff
CWRF Major Equipment CIP
Add a containment area adjacent to the sodium hypochlorite pit to allow for use of sodium hypochlorite totes to be used as a redundant means of supply. Modify piping to hypo pump feed line to allow for tie-in of a redundant supply to the system. consider using the threshold inhibitor tank area (remove tank) or sulfuric acid containment area (remove unused equipment) Owner 2021 EWA Staff
CWRF Minor Mechanical
Rehabilitation
The UF system air scour lines are becoming brittle due to sunlight (UV light) bypassing the UF area structure sunshade. Consider sunshade modification, tubing or budget for replacement of all UF system plastic tubing on a regular cycle or as needed. EWA 2021 EWA Staff CWRF Minor Structural
Rehabilitation
Install a footpath/ stair between CWRF and CPS (can be done in conjunction to # 8 or independently). three options were provided as options, but more solutions may be engineered. see attached picture for possible options. EWA 2021 EWA Staff CWRF Work Order Restore/replace the break tank hypo pump (P-1103.2) to provide redundancy to UF system. The pump will be programmed with new SCADA for UF service in a duty/ standby configuration. EWA 2021 EWA Staff CWRF Minor Mechanical
Rehabilitation Re-pipe hypo system to add redundancy between hypo feed pump system (GMF to CCT, CCT to GMF). CCT pump P1101-3) EWA 2021 EWA Staff CWRF Work Order Re-pipe the recycled water lines and hose bibs around the storage basins to eliminate areas of pipe sagging, and areas of metal oxidation at hose bibbs. EWA 2021 EWA Staff
CWRF Irrigation and Landscaping
Memorialize in RCAMP that CMWD should budget for and maintain the landscape and associated irrigation in and out of the facility. Consider desertscape or zeroscape landscape if not a "showpiece" of recycle water usage. Trees inside and out of facility need to be maintained or removed. Homeless have been known to hide under the trees in the front yard. (This is a staff safety and asset liability)
Owner 2021 EWA Staff
CWRF
Operations and
Administration Building
Roof and HVAC
Remove admin building roof access ladders. Especially the ladder that faces the street. Owner 2021 EWA Staff CWRF Minor Structural
Rehabilitation
Remove storage basin south wall at end of catwalk to allow access from both directions. (Can be done at same time as re-pipe as the pipe will need to be modified once the wall is removed) EWA 2021 EWA Staff CWRF Minor Mechanical
Rehabilitation
Remove MF containers and use the newly acquired space to install containment around larger UF CIP chemical storage tanks with level sensors. EWA 2021 EWA Staff
CWRF Landscaping High-line reclaimed water supply to front yard. (May not be needed upon completion of EWPCF hillside/ basin settlement mitigation project) Owner 2021 EWA Staff
CWRF Minor Mechanical
Rehabilitation Modify sump pumps in chemical areas (other than hypo) to discharge away from street and return discharge to EWPCF. EWA 2021 EWA Staff CWRF Minor Mechanical
Rehabilitation Put UF CIP chemical pumps behind a plexiglass cabinet to protect from sprays and splashes EWA 2021 EWA Staff 05/13/2025 C9 1044 of 1078
FY2023 R-CAMP Report
Appendix E13
Facility Project Assignment Project Description Responsible Party Project Source CWRF Major Equipment CIP Add a step and handrail from poly/alum pit to UF CIP chemical tanks area. Owner 2021 EWA Staff CWRF Minor EI&C Rehabilitation Replace all plastic electrical boxes with stainless steel enclosures EWA 2021 EWA Staff CWRF Major Equipment CIP Increase the size of the flow junction box near the generator to take the full flow of the CWRF to allow for automatic interlock diversion of the plant Owner 2021 EWA Staff
CWRF Minor EI&C Rehabilitation Install level monitoring equipment in the flow junction box near the generator to alarm if level high. EWA 2021 EWA Staff CWRF Work Order Repair or replace all street lighting and photocells for plant roadways EWA 2021 EWA Staff CWRF Minor Mechanical
Rehabilitation Add sluice gate to North side CCT to provide isolation of basin for maintenance EWA 2021 EWA Staff CWRF Site Safety Improvements Install lockout switches for UF air solenoids cabinets to allow for locking out of specific equipment rather than only closing the air supply to the entire air card cabinet EWA 2021 EWA Staff CWRF GMF Bypass Install GMF bypass line to allow CWRF to remain in production with UF system while GMF is flushing or off spec. EWA 2021 EWA Staff CWRF Site Safety Improvements Install davit arm/anchor points at storage basin and CCT EWA 2021 EWA Staff CWRF Work Order
Install an enclosed bulletin board next to GMF, UF, and CMWD surge tank pressure vessels for posting of pressure vessel permit to maintain State of California Department of Industrial Relations, Division of Occupational Safety & Health, Pressure Vessel Unit permit posting requirements as per Labor Code Section 7680.

EWA 2021 EWA Staff
CWRF SCADA Migration Make EWPCF and Pump Station SCADA available in CWRF control room EWA 2021 EWA Staff CWRF Work Order Remove concrete stains at locations such as: GMF below stairs, MF compressor pad, MF system slab, RO CIP tank, RWPS compressor pad, CPS/ SEEPS equipment pads EWA 2021 EWA Staff CWRF Minor Structural
Rehabilitation Repair or replace exposed anchor bolts at locations such as: GMF platform, Recycled Water Storage Compartment north facing wall EWA 2021 EWA Staff CWRF Minor Structural
Rehabilitation
Evaluate locations of standing water and repair as necessary at locations such as: The chemical delivery zone, RWPS electrical room, UF system slab EWA 2021 EWA Staff
CWRF Major Equipment CIP
As recommended by Keri Martinez and their storm water consultant (MOE) it would be desirable to add a trench drain along the south and western concrete slabs next to the open area to capture any hose down run off and direct it to the equalization basin (rat pit).

Owner 2021 EWA Staff
CWRF Major Equipment CIP Add an automatic strainer on the discharge side of the CMWD distribution pumps to protect their system from debris that may enter the open storage basin. Owner 2021 EWA Staff
CWRF Major Equipment CIP The membranes at UF been installed in 2016 and their useful life is about 8-10 years. Owner 2021 Condition Assessment CWRF Major Equipment CIP
Install a second hypo tank. A second tank would allow for more storage and could prevent production disruptions caused by delivery driver shortages, chemical production delays, holiday delays, and allow for fewer deliveries (deliveries are moderately risky operations as there is more chance of a spill or injury). CWRF currently receives hypo deliveries every week and sometimes multiple deliveries per week depending on demand.

Owner 2021 EWA Staff & Site Visit
CWRF Major Equipment CIP Add a vehicle path between EWPCF and CWRF to allow carts/ forklift/ light vehicles to move between EWA operated facilities without having to put non-street legal vehicles on Avenida Encinas. ES-103: Vehicle path between the two plants would be nice Owner 2021 EWA Staff & Site Visit CWRF Work Order?
The storm water drain in close proximity to chemical areas should have the ability to be sealed off during chemical deliveries to avoid potential impacts from delivery leaks/ spills, and/or process overflows. ES-95: Like to relocate the drain or block its during chemical delivery.

EWA 2021 EWA Staf f & Site Visit
CWRF
Operations and
Administration Building
Roof and HVAC
Install a ladder cage on the roof access ladder attached to the East side (plant side) of the admin building. ES-104: Admin building security, ladder, lock and safety cage Owner 2021 EWA Staff & Site Visit 05/13/2025 C9 1045 of 1078
FY2023 R-CAMP Report
Appendix E14
Facility Project Assignment Project Description Responsible Party Project Source CWRF Work Order Repair or replace all non-functioning lighting and photocells in plant production areas and CCT area ES-107: Lighting at CCT doesn't work. EWA 2021 EWA Staff & Site Visit
CWRF Work Order Purchase lockout devices (application specific) in sufficient quantity to lock out wheel valves and ball valves throughout facility EWA 2021 EWA Staff & Site Visit CWRF SCADA Migration? Like to get an HMI closer to UF EWA 2021 Site Visit CWRF Minor Equipment CIP Sand at GMF been partially replaced 6 years ago planning to do full change of sand. EWA 2021 Site Visit CWRF Facility Level Assessment UF - no isolation valve for each module. Like to have and be able to isolate each module as needed. EWA 2021 Site Visit CWRF Facility Level Assessment Like to have a gate at north CCT EWA 2021 Site Visit CWRF Minor EI&C Rehabilitation Probes for chlorine concentration not accurate would be nice to have permanent sample pumps for continued measurement. EWA 2021 Site Visit CWRF Minor Equipment CIP Nice to have a funnel type skimmer on CCT. EWA 2021 Site Visit CWRF Facility Level Assessment Get the wall section at the end of the basins to move EWA 2021 Site Visit CWRF Minor Equipment CIP Pipe around the basin leak? EWA 2021 Site Visit CWRF Site Safety Improvements Diversion valve vault around basins - like to have ladder and safety post EWA 2021 Site Visit CWRF GMF Bypass GMF bypass is a big one for them. They can't flush GMF out and have UF going out sand filter. A return line down Encina before it goes back to contact tank. GMF capacity 4 MGD. UF 3.4 MGD. EWA 2021 Site Visit CWRF Minor EI&C Rehabilitation Improve turnaround. EWA 2021 Site Visit CWRF SCADA Migration All the valves are manually operated. Missing instrument, should be added to SCADA. EWA 2021 Site Visit CWRF Minor Equipment CIP Like to have the drains back to the treatment citric acid. Sodium Hypo, Sodium Bisulfite EWA 2021 Site Visit CWRF Minor Structural
Rehabilitation
Steps between the containments for easier [access]. The other containment is not used but they need to have the ability to divert based on permit. But this is not cost effective. EWA 2021 Site Visit CWRF Minor EI&C Rehabilitation Nice to have level transmitter on smaller tanks EWA 2021 Site Visit CWRF Minor Equipment CIP Lots of chemical pipe leaking at joints. EWA 2021 Site Visit CWRF Site Safety Improvements Light under shade structures work. Street lighting does not work. Lighting specially at CCT should be repaired. Automatic lighting at shade structures. EWA 2021 Site Visit
CWRF Minor Structural
Rehabilitation Water accumulates next to the MCC Bldg. and gets into the MCC Bldg. EWA 2021 Site Visit CWRF Recurring Modify the diversion box next to SEEPS generator to take full plant flow & integration of automatic plant diversion if out of spec. (Automatic failsafe) EWA 2021 EWA staff
CWRF Coatings and Paintings Most butterfly valves need coating EWA 2021 Site Visit 05/13/2025 C9 1046 of 1078
FY2023 R-CAMP Report
Appendix F1
Appendix F: Asset Register
Table F-1: BCPS Asset Register
05/13/2025 C9 1047 of 1078
FY2023 R-CAMP Report
Appendix F2
05/13/2025 C9 1048 of 1078
FY2023 R-CAMP Report
Appendix F3
05/13/2025 C9 1049 of 1078
FY2023 R-CAMP Report
Appendix F4
Table F-2: RBPS Asset Register
05/13/2025 C9 1050 of 1078
FY2023 R-CAMP Report
Appendix F5
05/13/2025 C9 1051 of 1078
FY2023 R-CAMP Report
Appendix F6
Table F-3: BVPS Asset Register
05/13/2025 C9 1052 of 1078
FY2023 R-CAMP Report
Appendix F7
05/13/2025 C9 1053 of 1078
FY2023 R-CAMP Report
Appendix F8
05/13/2025 C9 1054 of 1078
FY2023 R-CAMP Report
Appendix F9
05/13/2025 C9 1055 of 1078
FY2023 R-CAMP Report
Appendix F10
Table F-4: AHLS Asset Register
05/13/2025 C9 1056 of 1078
FY2023 R-CAMP Report
Appendix F11
05/13/2025 C9 1057 of 1078
FY2023 R-CAMP Report
Appendix F12
05/13/2025 C9 1058 of 1078
FY2023 R-CAMP Report
Appendix F13
05/13/2025 C9 1059 of 1078
FY2023 R-CAMP Report
Appendix F14
Table F-5: CWRF Asset Register
05/13/2025 C9 1060 of 1078
FY2023 R-CAMP Report
Appendix F15
05/13/2025 C9 1061 of 1078
FY2023 R-CAMP Report
Appendix F16
05/13/2025 C9 1062 of 1078
FY2023 R-CAMP Report
Appendix F17
05/13/2025 C9 1063 of 1078
FY2023 R-CAMP Report
Appendix F18
05/13/2025 C9 1064 of 1078
FY2023 R-CAMP Report
Appendix F19
05/13/2025 C9 1065 of 1078
FY2023 R-CAMP Report
Appendix F20
05/13/2025 C9 1066 of 1078
FY2023 R-CAMP Report
Appendix F21
05/13/2025 C9 1067 of 1078
FY2023 R-CAMP Report
Appendix F22
05/13/2025 C9 1068 of 1078
FY2023 R-CAMP Report
Appendix F23
05/13/2025 C9 1069 of 1078
FY2023 R-CAMP Report
Appendix F24
05/13/2025 C9 1070 of 1078
FY2023 R-CAMP Report
Appendix F25
05/13/2025 C9 1071 of 1078
FY2023 R-CAMP Report
Appendix F26
05/13/2025 C9 1072 of 1078
FY2023 R-CAMP Report
Appendix F27
05/13/2025 C9 1073 of 1078
FY2023 R-CAMP Report
Appendix F28
05/13/2025 C9 1074 of 1078

VICINITY MAP
(;+,%,7
05/13/2025 C9 1075 of 1078

EXHIBIT 5

Agreement to Comply with California Labor Law Requirements

05/13/2025 C9 1076 of 1078




$*5((0(1772&203/ <:,7+&$/,)251,$/$%25/$:5(48,5(0(176 72%((;(&87('%<%,''(5$1'68%0,77(':,7+%,'
>/DERU&RGH††@ 7KHXQGHUVLJQHG&RQWUDFWRUFHUWLILHVWKDWLWLVDZDUHRIDQGKHUHE\DJUHHVWRIXOO\FRPSO\ZLWKWKHIROORZLQJ SURYLVLRQVRI&DOLIRUQLDODZ

 1RFRQWUDFWRURUVXEFRQWUDFWRUPD\EHOLVWHGRQDELGSURSRV DOIRUDSXEOLFZRUNVSURMHFWXQOHVV UHJLVWHUHGZLWKWKH'HSDUWPHQWRI,QGXVWULDO5HODWLRQVSXUVXDQWWR/DERU&RGHVHFWLRQ>ZLWKOLPLWHG H[FHSWLRQVIURPWKLVUHTXLUHPHQWIRUELGSXUSRVHVRQO\XQGHU/DERU&RGHVHFWLRQ D
@1RFRQWUDFWRU
RUVXEFRQWUDFWRURIDQ\WLHUPD\EHDZDUGHGDFRQWUDFWIRUSXEO LFZRUNRQDSXEOLFZRUNVSURMHFWZLWKRXW SURRIRIUHJLVWUDWLRQZLWKWKH'HSDUWPHQWRI,QGXVWULDO5HODWLR QVSXUVXDQWWR/DERU&RGHVHFWLRQ 7KLVSURMHFWLVVXEMHFWWRFRPSOLDQFHPRQLWRULQJDQGHQIRUFHPHQWE\WKH'HSDUWPHQWRI,QGXVWULDO5HODWLRQV  &RQWUDFWRUDFNQRZOHGJHVWKDWWKLVFRQWUDFWLVVXEMHFWWRWKH SURYLVLRQVRI'LYLVLRQ3DUW&KDSWHU 
FRPPHQFLQJZLWK6HFWLRQ
RIWKH&DOLIRUQLD/DERU&RGHU HODWLQJWRSXEOLFZRUNVDQGWKHDZDUGLQJ SXEOLFDJHQF\
³$JHQF\´
DQGDJUHHVWREHERXQGE\DOOWKHSURY LVLRQVWKHUHRIDVWKRXJKVHWIRUWKLQIXOO KHUHLQ
 &RQWUDFWRUDJUHHVWRFRPSO\ZLWKWKHSURYLVLRQVRI&DOLIRUQL D/DERU&RGH6HFWLRQZKLFK UHTXLUHVWKHSD\PHQWRIWUDYHODQGVXEVLVWHQFHSD\PHQWVWRHDFK ZRUNHUQHHGHGWRH[HFXWHWKHZRUNWR WKHH[WHQWUHTXLUHGE\ODZ
 &RQWUDFWRUDJUHHVWRFRPSO\ZLWKWKHSURYLVLRQVRI&DOLIRUQL D/DERU&RGH6HFWLRQVDQG FRQFHUQLQJWKHSD\PHQWRISUHYDLOLQJUDWHVRIZDJHVWRZRUNHUVDQGWKHSHQDOWLHVIRUIDLOXUHWRSD\SUHYDLOLQJ ZDJHV7KH&RQWUDFWRUVKDOODVDSHQDOW\WRWKH$JHQF\IRUIHL WQRWPRUHWKDQILIW\GROODUV 
IRUHDFK
FDOHQGDUGD\RUSRUWLRQWKHUHRIIRUHDFKZRUNHUSDLGOHVVWKD QWKHSUHYDLOLQJUDWHVDVGHWHUPLQHGE\WKH 'LUHFWRURI,QGXVWULDO5HODWLRQVIRUWKHZRUNRUFUDIWLQZKLFK WKHZRUNHULVHPSOR\HGIRUDQ\SXEOLFZRUN GRQHXQGHUWKHFRQWUDFWE\&RQWUDFWRURUE\DQ\VXEFRQWUDFWRU  &RQWUDFWRU DJUHHV WR FRPSO\ ZLWK WKH SURYLVLRQV RI &DOLIRUQL D /DERU &RGH 6HFWLRQ  ZKLFK UHTXLUH&RQWUDFWRUDQGHDFKVXEFRQWUDFWRUWR

NHHSDFFXUDWHSD\UROOUHFRUGV

FHUWLI\DQGPDNHVXFK
SD\UROO UHFRUGV DYDLODEOH IRU LQVSHFWLRQ DV SURYLGHG E\ 6HFWLRQ DQG 
 LQIRUP WKH$JHQF\ RI WKH
ORFDWLRQRIWKHUHFRUGV7KH&RQWUDFWRULVUHVSRQVLEOHIRUFRPS OLDQFHZLWK6HFWLRQE\LWVHOIDQGDOORI LWVVXEFRQWUDFWRUV
 &RQWUDFWRU DJUHHV WR FRPSO\ ZLWK WKH SURYLVLRQV RI &DOLIRUQL D /DERU &RGH 6HFWLRQ  FRQFHUQLQJWKHHPSOR\PHQWRIDSSUHQWLFHVRQSXEOLFZRUNVSURMHF WVDQGIXUWKHUDJUHHVWKDW&RQWUDFWRULV UHVSRQVLEOHIRUFRPSOLDQFHZLWK6HFWLRQE\LWVHOIDQGDOORILWVVXEFRQWUDFWRUV  &RQWUDFWRUDJUHHVWRFRPSO\ZLWKWKHSURYLVLRQVRI&DOLIRUQL D/DERU&RGH6HFWLRQFRQFHUQLQJ SHQDOWLHV IRU ZRUNHUV ZKR ZRUN H[FHVV KRXUV 7KH &RQWUDFWRU VKDOO DV D SHQDOW\ WR WKH$JHQF\ IRUIHLW WZHQW\ILYHGROODUV

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

 &RQWUDFWRU VKDOO SURYLGH WR &LW\ DV D FRQGLWLRQ SUHFHGHQW W R WKH SD\PHQW RI &RQWUDFWRU¶V ILQDO UHWHQWLRQDFRPSOHWHOLVWRIDOOVXEFRQWUDFWRUVZKRKDYHZRUNH GRQWKH3URMHFWLQFOXGLQJWKHLUUHJLVWUDWLRQ QXPEHUV7KLVOLVWPXVWEHSURYLGHGDWOHDVWGD\VSULRUWRWKHSD\PHQWRIWKHILQDOUHWHQWLRQDQGVKDOOEH VXEPLWWHGXQGHUSHQDOW\RISHUMXU\
 7 RWKHIXOOHVWH[WHQWSHUPLWWHGE\ODZDQGZLWKRXWOLPLWDWL RQE\WKHRWKHUSURYLVLRQVRIWKLV&RQWUDFW UHODWLQJWRLQGHPQLILFDWLRQDQGLQVXUDQFH&RQWUDFWRUVKDOODOV RLQGHPQLI\GHIHQGDQGKROGKDUPOHVV&LW\ 05/13/2025 C9 1077 of 1078




DQGLWVGLUHFWRUVRIILFHUVHPSOR\HHVDQGDJHQWVIURPDQGDJDLQVWDOOOLDELOLW\H[FOXGLQJSHQDOWLHVDVVHVVHG DJDLQVW&LW\XQGHU/DERU&RGH6HFWLRQEXWLQFOXGLQJZL WKRXWOLPLWDWLRQDVVRFLDWHGLQYHVWLJDWLRQ DQGDGPLQLVWUDWLYHH[SHQVHVGHIHQVHFRVWVUHDVRQDEOHDWWRUQH\ V IHHVH[SHUWZLWQHVVIHHVFRXUWFRVWV
DQGFRVWVRIDOWHUQDWLYHGLVSXWHUHVROXWLRQUHVXOWLQJIURP&RQWUDFWRU¶VIDLOXUHWRFRPSO\ZLWKWKHSURYLVLRQV RIWKLVVHFWLRQDQGRI$UWLFOH&KDSWHU3DUW'LYLVLRQ RIWKH&DOLIRUQLD/DERU&RGHZLWKUHVSHFWWR &RQWUDFWRUDOOVXEFRQWUDFWRUVRIDQ\WLHUDQGWKHLUUHVSHFWLYHHPSOR\HHVZRUNLQJXQGHUWKLV&RQWUDFW  &DOLIRUQLD/DERU&RGH6HFWLRQVDQGSURYLGHWKDWH YHU\FRQWUDFWRUZLOOEHUHTXLUHGWR VHFXUHWKHSD\PHQWRIFRPSHQVDWLRQWRLWVHPSOR\HHV,QDFFRUGDQFHZLWKWKHSURYLVLRQVRI&DOLIRUQLD/DERU &RGH6HFWLRQ&RQWUDFWRUKHUHE\FHUWLILHVDVIROORZV 
³,DPDZDUHRIWKHSURYLVLRQVRI6HFWLRQRIWKH/DERU&RGH ZKLFKUHTXLUHHYHU\HPSOR\HUWR EHLQVXUHGDJDLQVWOLDELOLW\IRUZRUNHU¶VFRPSHQVDWLRQRUWRXQGHUWDNHVHOILQVXUDQFHLQDFFRUGDQFH ZLWK WKH SURYLVLRQV RI WKDW FRGH DQG , ZLOO FRPSO\ ZLWK VXFK SURYLVLRQV EHIRUH FRPPHQFLQJ WKH SHUIRUPDQFHRIWKHZRUNRIWKLVFRQWUDFW´
6LJQDWXUH ' D W H   
1 D P H  7 L W O H  & R P S D Q \
 

05/13/2025 C9 1078 of 1078