(5) Rural Electrification Authority (REA), U.S. Department of Agriculture, Washington, DC, National Electrical Safety Code for Underground Construction for remote and immediate hazards.
SECTION 213 – ENGINEERING GEOSYNTHETICS
213-5 GEOTEXTILES AND GEOGRIDS.
Revise this subsection to read as follows:
213-5 GEOTEXTILES AND GEOGRIDS. Geosynthetic material used for reinforcing the subgrade or aggregate base, if necessary as determined by the Geotechnical Engineer, shall be Geogrid BX1100.
Add the following new Section:
SECTION 220 – MISCELLANEOUS
220-1 RESIDENTIAL MAILBOX.
220-1.1 General.
220-1.1 General. Mailboxes shall be of standard size (typically 8.75”H x 6.75”W x 19.0”D), made of solid aluminum, painted white by the manufacturer, and shall be approved by the United States Post Office. The mailbox shall be mounted on a pressure treated post and platform as shown on the City of Vista Standard Drawing SRF-04 consisting of a four-inch by four-inch (4”x 4”) pressure treated post (primed and painted with white solid body satin), one and one-half inches (1-1/2”) thick redwood or pressure treated platform (6.75”W x 19”D), and four galvanized lag bolts.
Prior to purchasing the new mailboxes the CONTRACTOR shall submit shop drawings to the ENGINEER for approval showing the manufacturers catalog sheets and including all mounting and installation details.
08/12/2025
C9
145 of 364
135
PART 3 - CONSTRUCTION METHODS
SECTION 300 – EARTHWORK
300-1 CLEARING AND GRUBBING.
300-1.1 General.
Add the following paragraphs to this subsection:
Clearing and Grubbing shall include the protection of all items to remain, sawcutting, cold milling AC pavement, demolition of existing improvements, salvaging existing materials (topsoil) and improvements as specified or shown on the Plans, removal of deleterious materials, and proper disposal from the Project site of all existing surface and subsurface materials as required to construct the improvement as shown on the Plans and as described in the Specifications.
Typical items to be removed include, but are not limited to, trash, fences, posts, poles, gates, street signs, AC dikes, AC paving, striping (by grinding), decorative concrete, concrete driveway entrance, concrete sidewalk, concrete curb and gutter, concrete headwall structures, retaining walls, landscape border logs, decorative walls, concrete pavers, reinforcing steel, rock, boulders and cobbles, trees, stumps and roots, shrubs, other vegetation or organic materials, soil, irrigation systems, spoils, debris, sewer pipe, storm drain pipe, storm drain inlets and grates, electrical conduits and pullboxes, wire, utility cabinets or boxes, drinking fountains, guardrails, delineators, pavement markers, and all other objectionable materials which interfere with the Work whether or not specifically indicated on the Plans or otherwise shown to be protected or relocated. Abandoned utility lines and structures not removed with Engineer’s approval shall be filled with blown sand and conduits plugged. Concrete and bituminous pavement shall be removed to neatly sawed edges. Sawcuts shall be to a minimum depth of three inches (3”).
Clearing and grubbing shall also include the relocation, adjusting or salvaging of all facilities so indicated on the Plans which are not designated as separate bid items or which are not included in other bid items.
If there are decorative items on private lots, including decorative concrete pavers, decorative wall blocks, rocks used for landscape decoration, boulders, and custom signs, and the Contractor would prefer to salvage items for the property owners, the items shall be removed carefully and placed at a location near the disturbed area on the private property, with the property owner’s approval.
The Contractor shall remove existing irrigation systems (including both water supply and water distribution lines, electrical supply, and electrical control elements of the system) that are within the Project limits and place these materials on the property owner’s property. Contractor shall cap ends of cut lines and wires, and mark locations with lath so that property owner can locate them later.
Miscellaneous fencing materials may be encountered during Work. The terminal post of each fence removed shall be reinforced by bracing or other appropriate means to maintain the structural 08/12/2025
C9
146 of 364
136
integrity of the portion of fence to remain. Relocation and reconnection of existing fences as shown on the Plans shall include all posts, hardware, and all incidentals necessary to complete the Work.
Terminations for all fire hydrants, WARF type services and associated piping to be removed and salvaged shall be in accordance with the Vista Irrigation District (VID) standards. The minimum requirements shall include removal of piping back to the mainline, closing the valve, and installation of a blind flange and thrust block.
All existing water services shall be relocated or extended to behind curb or behind sidewalk if contiguous to curb. The Contractor shall inspect and verify that the existing service, including the connection at the main, meets current Vista Irrigation District (VID) standards. Where existing services meet VID standards, extension of the service will be allowed at the price bid for water meter relocations.
All existing sewer or water facilities to be abandoned within the proposed Project limits shall be terminated at the mainline in accordance with district requirements. This shall include removal of the sewer and water service back to the main. The sewer lateral shall be capped with a fitting and sealed with concrete at the wye connection. The water service shall be terminated at the corporation stop and the stop closed.
During surface clearing operations, the Contractor shall not cover or bury any plant growth or other objectionable materials on public or private property. If the Contractor cannot successfully separate the plant growth from the surface soil and advertently or inadvertently mixes organic or other objectionable materials with the soil, the soil so contaminated shall be removed from the site by the Contractor. All costs, if any, associated with removing the soil mixed with organic or other objectionable materials and importing soil to replace said contaminated soil shall be borne by the Contractor and no additional payment shall be made to the Contractor.
During grading operations, the Contractor shall provide temporary graded driveways and continuing maintenance thereof to provide safe, smooth, stable and continuous access to all residences and businesses within the Project area. All costs, if any, associated with such grading operations shall be borne by the Contractor and no additional payment shall be made to the Contractor.
Unless otherwise noted on Plans, the Contractor shall protect all existing sewer, water, electric, telephone, communication, television, fire lines, street lights, traffic signal, red light cameras, irrigation, and other utilities, services and systems, whether shown on the Plans or not.
The Contractor shall maintain all services in working condition during the course of the Work.
The Contractor shall remove all existing abandoned pipelines and conduits of any type or use, and pipelines and conduits of any type or use that are abandoned during the course of the Work and shall replace said pipelines and conduits with properly compacted soils. The Contractor shall immediately restore to full operation any utilities, services or systems that are disturbed during the course of the Work.
300-1.4 Payment.
08/12/2025
C9
147 of 364
137
Modify this subsection to read as follows:
300-1.4 Payment . The BID SCHEDULE DOES NOT include a bid item for Clearing and Grubbing. Full compensation for any necessary Clearing and Grubbing required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work, and no additional compensation will be allowed therefore.
Payment for removal and disposal of abandoned utilities shall be included in the various items of work and no additional compensation will be allowed therefore.
300-2 UNCLASSIFIED EXCAVATION.
300-2.1 General.
Modify this subsection to read as follows:
300-2.1 General. Unclassified excavation shall consist of all excavation, including roadway excavation, removal and stockpiling of suitable material, mixing and moisture conditioning of dry material, mixing and drying of wet material by various methods, disposal of unsuitable materials (including cobbles, rocks and boulders), salvage and stockpile of existing topsoil for use on the Project, and all other required earthwork operations to bring all areas that are within the grading and excavation limits on both public and private property to the required subgrade elevations and cross sections as shown on the Plans and as required in the Project’s geotechnical investigation. Suitable excavated material may be used onsite to make all fills shown on the Plans. Unclassified excavation shall also include pumping and disposal of storm water and groundwater. Any tree roots or other deleterious material uncovered during excavation shall be completely removed and cut back so that new improvements will not be affected by future root growth.
In the event weather conditions make drying by aeration or other processes impractical as determined by the engineer, he may suspend the Work. However, the Contractor shall continuously provide for traffic and access requirements during the suspension period in conformance with these Technical Provisions. The Work shall be suspended as provided for in Section 6 (“PROSECUTION, PROGRESS, AND ACCEPTANCE OF THE WORK.”) of the Standard Specifications except the suspension shall not be deemed to be suspension by the Agency for its own convenience or benefit.
Stockpiling of material and storage of equipment or supplies associated with excavation and/or soil aeration activities within existing or proposed wetland, willow woodland or riparian areas is strictly prohibited.
The excavation, placement, conditioning, and compaction of material shall be in accordance with the Plans, Specifications, the City of Vista Development Code (Chapter 17 Section 17.56).
300-2.2 Unsuitable Material.
300-2.2.1 General.
Modify this subsection to read as follows:
08/12/2025
C9
148 of 364
138
300-2.2.1 General . All excess material generated by the grading operations that is not suitable for backfill shall be excavated and disposed of by the Contractor at a legal disposal site.
The Agency makes no claim on the suitability or moisture content of the existing materials. Any suitable local borrow materials at the site that the Contractor wishes to re-use shall be stockpiled by the Contractor. The location of stockpiles shall be approved by the Engineer prior to placement of materials, and all stockpiles shall be protected by erosion control measures.
All subgrade areas to receive fills or structures shall be inspected by the Geotechnical Engineer. All alluvial and colluvial soils, loose or poorly compacted soils, or existing dry material must be reworked before the placement of base or concrete can proceed. Areas where soils are loose or poorly compacted shall be reworked by excavating, blending and recompacting the loose soils to the specified compaction. The existing loose soils to be reworked shall be removed by the Contractor until a firm unyielding surface is exposed or to a depth determined by the Engineer. Dry materials shall be scarified and moisture conditioned to achieve the specified compaction. With the approval of the Geotechnical Engineer, the Contractor may choose to stabilize poorly-compacted areas with geogrid at his own expense.
If the Contractor wishes to temporarily stockpile material for disposal at a later date in any area other than the project area or construction staging area, the Contractor shall locate a suitable space which is outside the Public Right-of-Way and suitable to the Agency. The location of stockpiles shall be approved by the Engineer prior to placement of materials, and all stockpiles shall be protected by storm water pollution prevention and erosion control measures. The stockpiles shall be removed regularly from the Project site so as not to interfere with access to the Project.
If the excavated material is unsatisfactory as excavated for other uses in the Project, as determined by the Engineer, the Contractor shall remove and dispose of such excavated material off the site. The Contractor shall be responsible for obtaining a suitable legal disposal site for any unsuitable excavated materials in accordance with the appropriate section in the Standard Specifications.
300-2.2.2 Wet Material.
Modify this subsection to read as follows:
300-2.2.2 Wet Material. If required excavated material is unsatisfactory for the specified use on the Project solely because the material has a moisture content of four percent (4%) or more above the optimum moisture content, the Contractor shall process the material to reduce the moisture content to an optimum condition, or remove the material and replace it with suitable material. The material may be processed by blending the wet soil with soils having a lower moisture content and / or spreading the excavated material in a manner that enables the material to dry to optimum moisture content. With the approval of the Geotechnical Engineer, the Contractor may choose to stabilize unstable subgrade areas with geogrid at his own expense.
300-2.7 Selected Material.
08/12/2025
C9
149 of 364
139
Modify this subsection to read as follows:
300-2.7 Selected Material. Selected material encountered in excavation within the right-of- way shall be used as directed by the Engineer. Topsoil excavated within the limits of the Project may be considered as a selected material only for the purpose of backfilling areas to be planted.
300-2.8 Measurement.
Add the following paragraph to this subsection:
The Plans and the Specifications show work to be done which requires earthwork, both cut and fill, to establish the lines and grades shown on the Plans. The Agency has endeavored to establish reasonable accurate earthwork quantities of the work actually involved and these quantities represent the results of actual survey measurements and data and calculated adjustments for changes proposed on the Plans, however, due to the approximate nature of such data and therefore the difficulty of making accurate measurements of earthwork quantities for this type of project, the estimated quantities for grading will be assumed to be the actual quantity. The Contractor shall review the site and make his own estimate of the Work required to complete the Project. No modifications shall be made to the quantity shown on the Plans and in the Specifications, unless additional quantities of grading are ordered by the Engineer.
300-2.9 Payment.
Modify this subsection to read as follows:
300-2.9 Payment. The BID SCHEDULE for this Project includes a bid item for Unclassified Excavation. Full compensation for all necessary Unclassified Excavation required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for Unclassified excavation and fill (includes export) , and no additional compensation will be allowed therefore.
The excavation, stockpiling, and placement of topsoil and suitable local borrow material will be included in Unclassified Excavation. Removing such material from the stockpile and placing it in its final position is also included in Unclassified Excavation. The Contractor may stockpile suitable local borrow material or import suitable borrow material; however, no separate payment will be made for excavating material from an optional stockpile or importing suitable borrow material and placing the material in its final position.
The removal and disposal of unsuitable material, and the over-excavating and reworking of material that can be made suitable, including groundwater removal by various drying procedures or other remedial geotechnical (soil) treatment shall be included in Unclassified Excavation and no additional compensation will be allowed.
The over-excavation and processing or removal and disposal of wet materials shall be included in Unclassified Excavation and no additional compensation will be allowed.
08/12/2025
C9
150 of 364
140
No separate payment will be made for excavating topsoil temporarily stockpiled and placing in its final location on the slope and other areas to be planted for erosion control planting or landscaping, whether or not required by the Contract Documents or by the Engineer.
300-4 UNCLASSIFIED FILL.
300-4.1 General.
Add the following paragraphs to this subsection:
The excavation, placement, conditioning, and compaction of material shall be in accordance with the Plans, Specifications, the City of Vista Development Code (Chapter 17 Section 17.56).
Any objectionable material, including organic and inorganic debris, shall be removed, and shall not be placed in the fill.
The Contractor shall establish rough grade of the areas to be planted by placing fill material to a minimum of six inches (6”) below the finished grade shown on the Plans. The Contractor shall then complete the grading work to establish finished grade by placing a minimum of six inches (6”) of topsoil that has been stockpiled from the existing site or imported.
Excess soil remaining from excavations on the Project site may only be used for fill material when rocks, lumps, cobbles, clods, base material, or other solid materials such as broken concrete or asphalt from removal operations are suitable for the particular area to be filled as determined by the Engineer. Broken concrete or asphalt pavement materials shall not be allowed within site grading fill areas or roadway fills less than three feet (3’) in height, within three feet (3’) of final grade in any area or within five feet (5’) (vertically) of the existing ground water table. Any concrete or asphalt placement shall be approved by the Resident Engineer. Concrete or asphalt pieces shall be less than six inches (6”) in maximum dimension and surrounded by soil particles when used as compacted fill. No nesting shall occur. If the Contractor wishes to use any of the excess material remaining from the Project excavations for any purpose, the material must be suitable for use as fill or backfill and meet the requirements of Subsection 300-4 (“UNCLASSIFIED FILL.”) of the Standard Specifications and the geotechnical investigation for this Project. The Contractor shall first remove all organic material, construction debris, miscellaneous debris, rubbish, and other objectionable materials contained therein, then obtain tests of the material to the project geotechnical testing laboratory to confirm its suitability.
Geotechnical (soil) testing of all fill materials; subgrade, subbase, and base will be conducted by the Agency and the Geotechnical Engineer. Geotechnical (soil) tests may include relative compaction tests, sand equivalent tests, sieve analysis, R-values, etc. The results shall be presented directly by the laboratory to the Engineer. No base or PCC pavement shall be placed prior to the subgrade or subbase being compacted, tested and approved by the Engineer.
The cost of any initial geotechnical (soil) tests shall be borne by the Agency. Additional geotechnical (soil) tests due to the failure of one (1) or more of the initial tests shall be conducted by the laboratory and any costs borne by the Contractor. The Contractor shall make allowances in his construction procedure to permit testing of the Work in progress by the Engineer, and no additional compensation shall be paid to the Contractor for delays due to testing. 08/12/2025
C9
151 of 364
141
300-4.10 Payment.
Modify this subsection to read as follows:
300-4.10 Payment. The BID SCHEDULE for this Project DOES list a bid item for Unclassified Fill. Full compensation for any necessary Unclassified Fill required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for Unclassified excavation and fill (includes export), and no additional compensation will be allowed therefore.
300-5 BORROW EXCAVATION.
300-5.2 Imported Borrow.
Add the following paragraph to this subsection:
In accordance with the provisions of Section 20676 of the State of California Public Contract Code, it shall be mandatory upon the Contractor to whom the Contract is awarded, and upon all subcontractors and suppliers under him, to obtain all construction aggregate, sand, gravel, crushed stone, road base, fill materials, and any other mineral materials used for Imported Borrow, from a supplier that is included on the most current Office of Mine Reclamation AB 3098 List (as proposed in California Assembly Bill 3098 and now codified in Section 2717.(b) of the State of California Public Resources Code). Failure to identify the supplier and the mine may result in rejection of the submittal, and any work completed using materials from an unlisted mine will be SUBJECT TO REJECTION.
300-5.4 Measurement and Payment.
Modify this subsection to read as follows:
300-5.4 Measurement and Payment . The BID SCHEDULE for this Project DOES NOT list a bid item for borrow excavation. Full compensation for any necessary borrow required to perform the construction operations specified shall be considered as included in the related items of work for which the borrow excavation is required, and no additional compensation will be allowed therefore.
300-12 EROSION CONTROL.
300-12.1 General.
Add the following new subsection:
300-12.1 General. The Contractor shall provide erosion control and water pollution control conforming to the requirements shown on the Plans, as specified herein, and as elsewhere required by the Contract Documents. Erosion control and water pollution control shall include the Work specified herein, and such additional measures, as may be directed by the Engineer, 08/12/2025
C9
152 of 364
142
to meet Best Management Practices, as defined herein, and to properly control erosion and storm water damage of the limits of work and construction impacts upon areas receiving drainage flows from within the limits of work.
The work covers the prevention, control and abatement of waterborne silts, sediments, earth materials, inorganics, chemicals, construction materials, trash, and debris in order that pollution of the existing onsite and downstream watercourses is prevented or minimized. The Work includes preventing, controlling or abating water polluting elements or materials which may result both directly and indirectly from within and outside the Project work limits. This includes water flow from, to, or through the site resulting from rainfall runoff, groundwater movement, and stream storm water discharge.
The work includes:
a] the exercise of care and the execution of every reasonable precaution by the Contractor as required by the conditions of the site, weather and construction activities involved;
b] the implementation of construction of various devices, facilities, or features shown on the Plans;
c] the implementation or construction of any devices, facilities, or programs as required conditions of any regulatory agency permits for the Project. The Work therefore includes, but is not limited to, the construction and / or installation of temporary devices such as hay (straw) bales; silt fences; gravel bags; erosion control netting, fabric, blankets, or mats; silt or sediment basins; dikes or berms; swales, linings; ponds; diversion structures, pipes, and related facilities.
d] the cleaning, repairing, silt and sediment removal, maintenance and the removal of devices.
Note: The Contractor’s attention is also directed to the specific requirements contained within the regulatory agency conditional agreements.
Unless other more restrictive requirements are specified elsewhere in the General Conditions or these Special Provisions, or as a requirement of regulatory or other Agency permits, the following minimum provisions shall be met:
a] Equipment and workers for emergency work shall be made available at all times during the rainy season. All necessary materials shall be stockpiled on site at convenient locations to facilitate rapid construction or deployment of temporary devices when rain is imminent.
b] Devices shown on the Plans shall not be moved or modified without the approval of the Engineer.
c] The Contractor shall restore all erosion control devices to working order to the satisfaction of the Engineer after each runoff-producing rainfall, and every 24 hours during a prolonged storm event, as needed.
d] The Contractor shall install additional erosion control measures as may be required by the Engineer due to uncompleted grading operations or unforeseen circumstances which may arise.
08/12/2025
C9
153 of 364
143
e] The Contractor shall be responsible and shall take necessary precautions to prevent public trespass onto areas when impounded waters create a hazardous condition.
f] During the rainy season and when rainfall is probable, graded areas around the Project perimeter must drain away from the face of slope at the conclusion of each working day.
g] All removable protective devices shown shall be in place at the end of each working day when the five (5) calendar day rain probability forecast exceeds thirty percent (30%).
Compliance with the requirements of this subsection shall in no way relieve the Contractor from his responsibility to comply with the other provisions of the contract, in particular his responsibility for damage and for preservation or property.
Failure to take said measures satisfactory to the Engineer or regulatory agencies will subject Contractor to orders to cease operations. Any losses to Contractor associated therewith shall be at Contractor’s sole expense.
300-12.2 Grading Controls.
Add the following new subsection:
300-12.2 Grading Controls. The Contractor shall protect all areas that have been graded and/or cleared and grubbed as well as areas that have not been graded and/or cleared and grubbed within the limits of work from erosion. The Contractor shall provide temporary earth berm, fiber rolls, gravel bags, silt fences, stabilized construction entrances and similar measures, coordinated with its construction procedures, as necessary and as shown on the Plans to control on site and off site erosion during the construction period. The Contractor shall protect areas which have been cleared and grubbed prior to excavation or embankment operations, and which are subject to runoff during the duration of the contract. The criteria used to determine the appropriate erosion control measures shall be the “Best Management Practices”, hereinafter BMP, defined and described in the latest edition of the "California Storm Water Best Management – Construction Handbook" as published by the Storm Water Quality Task Force [go to the CASQA on-line bookstore at the following URL to purchase, download or view handbook(s)]:
http://www.cabmphandbooks.com
The Contractor shall maintain a copy of the latest edition of the "California Storm Water Best Management – Construction Handbook" on the Project site and shall conduct its operations in conformity to said Handbook.
Excavation and Embankment areas, while being brought to grade and during periods of completion prior to final surface construction, shall be protected from erosion and the resulting siltation of downstream facilities and adjacent areas, and be graded so as to direct runoff into impoundment areas within the limits of work where such runoff shall have pollutants removed by BMP methods. The Contractor shall provide protection by BMP measures to eliminate erosion and the siltation of downstream facilities and adjacent areas. These measures shall include all means necessary to prevent polluted runoff from leaving the site. 08/12/2025
C9
154 of 364
144
300-12.4 Payment.
Add the following new subsection:
300-12.4 Payment . Payment for all work required to provide Storm Water Pollution Prevention and Erosion Control shall be included in the lump sum price included in the Bid specified as Storm Water Pollution Prevention and Erosion Control. Such price shall include full compensation for preparing the Storm Water Management Permit, the Storm Water Pollution Prevention Plan (SWPPP) where applicable, performing erosion control and water pollution control, conforming to the operational requirements herein, providing and maintaining all BMPs, removing all construction BMPs, conforming to the requirements of the current State Water Resources Control Board of California Order, and the current City of Vista Grading Ordinance, and no additional compensation will be allowed therefore.
SECTION 301 –SUBGRADE PREPARATION, TREATED MATERIALS,
AND PLACEMENT OF BASE MATERIALS
301-1 SUBGRADE PREPARATION.
301-1.1 General.
Modify this subsection to read as follows:
301-1.1 General. This subgrade preparation specification shall govern the preparation of natural, filled, or excavated material prior to the final placement of subbase or base material, geotextile fabric, drainage facilities, pavement, curbs and gutters, driveways, sidewalks, retaining walls or any concrete facilities or roadway structures. Subgrade preparation shall include, but not be limited to scarification and moisture adjustment and compaction of the top twelve inches (12”) of the subgrade in the pavement areas to ninety-five percent (95%) relative compaction, and attendant work, export of remaining excess material to a disposal site or spoil area acquired by the Contractor and pumping and disposal of storm and ground water. In areas where existing utilities may interfere with subgrade preparation work in the roadway prism, the Contractor may choose to place geogrid to stabilize the subgrade and reduce the depth of excavation.
Geotechnical (soil) testing of all fill materials; subgrade, subbase, and base will be conducted by the Agency and the Geotechnical Engineer. Geotechnical (soil) tests may include relative compaction tests, sand equivalent tests, sieve analysis, R-values, etc. The results shall be presented directly by the laboratory to the Engineer. No base or PCC pavement shall be placed prior to the subgrade or subbase being compacted, tested and approved by the Engineer.
The cost of any initial geotechnical (soil) tests shall be borne by the Agency. Additional geotechnical (soil) tests due to the failure of one (1) or more of the initial tests shall be conducted by the laboratory and any expenses borne by the Contractor. The Contractor shall make allowances in his construction procedure to permit testing of the Work in progress by the 08/12/2025
C9
155 of 364
145
Engineer, authorized representative or the Inspector, and no additional compensation shall be paid to the Contractor for delays due to testing.
301-1.7 Payment.
Revise this subsection to read as follows:
301-1.7 Payment. The BID SCHEDULE DOES NOT include a bid item for subgrade preparation. Full compensation for Subgrade Preparation required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work, and no additional compensation will be allowed therefore.
Payment for grading operations in areas designated as “grade only” will be considered as included in the price for excavation or fill.
301-2 UNTREATED BASE.
301-2.1 General.
Add the following to this subsection:
Concrete curb, gutter, cross gutter, spandrel, sidewalk, driveway, and flatwork shall be placed on untreated compacted aggregate base, unless the existing material under the areas being repaired is determined to be firm and unyielding by the Engineer. New Asphalt Concrete Pavement shall also be placed on untreated compacted aggregate base. Untreated compacted aggregate base shall have the following thicknesses under respective concrete surface improvement unless shown otherwise on the Plans or specified:
The Contractor will be allowed to reuse any existing base that is removed if the base material is removed without being contaminated by subgrade soils or other deleterious materials. The re-used base material must be moisture conditioned and compacted as specified. The Contractor shall provide water and compact the surface of any base material that will form the foundation for subsequent improvements, to meet the requirements of the Plans and specifications. The Contractor shall remove and replace any existing aggregate base that becomes contaminated.
301-2.3 Compacting.
Add the following as the first paragraph:
301-2.3 Compacting. It shall be the Contractor’s responsibility to provide adequate equipment and methods to accomplish the Work in accordance with these Specifications. The grading shall be done to the elevations provided in the Plans. Any field conditions that prevent the Contractor from matching design elevations shall be immediately notified to the Engineer. 08/12/2025
C9
156 of 364
146
Revise the third paragraph of this subsection to read as follows:
The relative compaction of each layer of compacted base material shall not be less than ninety-five percent (95%) for curbs, driveways and pavement for a minimum depth of one foot (1.0’) below the grading plane. Compaction under sidewalks and in the excepted areas shall be as specified in Subsection 211-1 (“COMPACTION TESTS.”) with each layer of compacted base material having a minimum compaction of ninety percent (90%).
301-2.4 Measurement and Payment.
Revise this subsection to read as follows:
301-2.4 Measurement and Payment. The quantities of new untreated aggregate base will be calculated using the square footage of the improvements constructed on the base, multiplied by the thickness of the base shown on the plans or specified. If the Engineer directs the Contractor to place additional base, the thickness requested by the Engineer will be used in calculating the pay quantity. If the base thickness is increased by the Contractor for his convenience or to avoid performing additional required subgrade preparation, the additional base will not be included in the pay quantity.
Because the determination of whether untreated aggregate base will be needed in certain areas depends on the condition of the existing materials, it is a rough estimate for bidding purposes.
To confirm the pay quantities, the Contractor shall furnish to the Engineer at the time of delivery of the material to the job site a legible copy of a licensed weigh master’s certificate showing gross, tare, and net weights of each truckload of untreated base. Failure of the Contractor to provide a certificate to the Engineer by the end of the day on which the material represented by such certificate is delivered to the job site may, at the discretion of the Engineer, result in the forfeiture of all payment for such material, including any labor and equipment costs or related costs included in the price for furnishing and placing the untreated base.
Payment for untreated compacted aggregate base will be made by Bid Price per CUBIC YARD as shown in the bid. Such bid price shall include full compensation for clearing and grubbing; earthwork; subgrade preparation; supplying, placing, spreading, compacting, and finishing the untreated base; and all other work required to perform the construction operations specified or shown on the Plans, and no additional compensation will be allowed therefore.
SECTION 302 – ROADWAY SURFACING
Revise this subsection to read as follows:
302-1 Crack Sealing
302-1.1 General
08/12/2025
C9
157 of 364
147
Add the following new subsection:
302-1.1 General. In areas where a slurry seal is to be made on existing paving, all cracks one-eighth inch (1/8”) wide or wider shall be sealed prior to the construction of an asphalt concrete overlay. The Engineer will make the sole determination as to which cracks shall be sealed.
All cracks one-eighth to one and one-half inches (1/8” – 1 ½”) wide shall be sealed with a hot applied rubberized asphalt sealant. All cracks shall be cleaned full depth by blowing operations prior to applying the sealant. The sealant shall be Crafco Polyflex Sealant, Type 2 or 3, or an approved equal. The Sealant shall be applied in accordance with the manufacturer’s instructions.
All cracks one and one-half inches (1 ½”) or wider shall be cleaned full depth, a tack coat applied to the edges and filled with a fine asphalt concrete hot mix.
Care shall be taken to avoid excess sealant being applied to the existing asphalt concrete surface. A squeegee shall be used to spread out excess sealant on small cracks. There shall be a one-half inch (½”) deep cup-shaped groove between the existing asphalt concrete surface and the top crack sealant placed in cracks one-half inch (½”) wide or wider. Excess sealant, as solely determined by the Engineer, shall be removed at the Contractor’s expense. Contractor shall keep traffic off of areas receiving crack seal until it has cured to the point where it will not be removed from cracks by vehicle tires. Cracks shall be sealed a minimum of seven (7) days prior to placement of slurry seal.
302-1.2 Measurement and Payment.
Add the following new subsection:
302-1.2 Measurement and Payment . Quantities of crack sealing for asphalt concrete overlay will be measured as shown in the BID SCHEDULE. Full compensation for any necessary crack sealing will be considered as included in the price bid for the related items of work , and no additional compensation will be allowed therefore.
302-5 ASPHALT CONCRETE PAVEMENT.
302-5.1 General.
Modify the first paragraph of this subsection to read as follows:
302-5.1 General. Asphalt concrete pavement shall consist of two (2) or more courses of a mixture of paving asphalt and graded aggregate as specified in Subsection 203-6 (“ASPHALT CONCRETE.”), placed on a prepared surface of existing or new untreated base, or over existing paving, as necessary to construct the roadway as shown on the Plans or as required to complete the Work (i.e. where new curb is placed, utility cuts, and manhole reconstruction area). The courses shall be of the type of mixture specified. The thickness of asphalt concrete pavement for initial patch areas next to gutters, spandrels, and curbs shall be a minimum of six inches (6”), and the thickness in trenches next to curbs and driveways and in trenches shall be one-inch (1”) 08/12/2025
C9
158 of 364
148
thicker than the existing pavement. The initial asphalt concrete patch base course for the items of work shown on the Plans shall be placed full depth from the aggregate base to the existing pavement surface as soon as the adjacent improvements are cured sufficiently to allow the paving to proceed. The initial asphalt concrete patch shall be placed in multiple move-ins to accommodate the required traffic control and staging phases, and to ensure that traffic is allowed to use the improvements as quickly as possible. Asphalt concrete in streets and parking lot areas where there is no base shall be placed on a prepared section of subgrade material to the thickness shown on the Plans. The surface course of asphalt concrete shall be a minimum of one and one-half inches (1-1/2”) thick with a one inch (1”) minimum thickness at the overlay key. The surface course shall be placed in the minimum number of move-ins necessary to accommodate the required traffic control and staging phases, but minimize the joints in the new asphalt concrete surface. Before the surface course is placed, the edges of existing pavement shall be cold milled to form an overlay key as shown on the Plans or as specified.
In a parking lot, the entire accessible parking stall and loading area shall not exceed two percent (2.00%) in any direction, NO EXCEPTIONS.
Add the following paragraph to read as follows:
Temporary asphalt concrete pavement and striping may be required to implement the traffic control and construction phasing shown on the Plans or specified. In sidewalk areas temporary AC surfacing shall be at least one inch (1”) thick. In the streets, a greater thickness may be required. Temporary surfacing and striping shall be placed before the end of the work period so traffic can be restored at the time of day specified, and it shall remain in place or be replaced regularly until the area is ready for permanent pavement and striping. Full compensation for all work required to install, maintain, and dispose of temporary asphalt concrete pavement and striping will be considered as included in the price bid for Traffic Control and Construction Phasing and no additional compensation will be allowed therefore.
302-5.2.3 Tack Coat.
Replace the first sentence of the first paragraph in this subsection with the following:
If the asphalt concrete pavement is being constructed directly upon an existing hard- surfaced pavement, a Tack Coat of PG 64-10 paving asphalt shall be uniformly applied at a rate no less than 0.07 gallons per square yard (g/sq. yd.) upon the existing pavement preceding the placement of asphalt concrete. Payment for this item shall be included in the unit price for the related asphalt concrete pavement or overlay and no additional compensation will be allowed.
302-5.9 Placement.
302-5.9.1 General.
Add the following paragraphs to this subsection:
Asphalt paving equipment shall be equipped with automatic screed controls and a sensing device or devices. When placing asphalt concrete, the automatic controls shall control the 08/12/2025
C9
159 of 364
149
longitudinal grade and transverse slope of the screed. Grade and slope references shall be furnished, installed, and maintained by the Contractor.
At locations where new asphalt concrete pavement joins an unimproved shoulder, the Contractor shall taper the new asphalt edge by raking out all aggregate three-eighths inch or larger (3/8+”) and feathering the new paving to form a smooth transition to join the unimproved shoulder. The transition shall extend a minimum of eighteen inches (18”) onto the shoulder.
Additional tack coat shall be applied to all tapered transitions to prevent raveling of the new pavement. Tapers shall be raked, rolled, and compacted so there is no lip exceeding one-quarter inch (1/4”).
Should the methods and equipment furnished by the Contractor fail to produce a layer of asphalt concrete conforming to the requirements, including straightedge tolerance, of Subsection 302-5.11 Compaction and 302-5.12 Smoothness of the Standard Specifications, the paving operations shall be discontinued and the Contractor shall modify their equipment or furnish substitute equipment.
Careful attention shall be given to maintaining proposed surface drainage conditions during placement of asphalt overlay. Unless otherwise directed by the Engineer, existing drainage patterns shall be maintained.
Should the automatic screed controls fail to operate properly during any work period, the Contractor may use manual control of the spreading equipment for the remainder of the work period; however, the equipment shall be corrected or replaced with alternative automatically controlled equipment conforming to the requirements in this Subsection before starting another work period.
Prior to placing asphalt concrete, the Contractor shall provide covers over all existing storm drain grates and inlets to prevent entry of debris.
The streets identified for overlay may have rutting, offset crowns, high spots, or low spots that need to be corrected to re-establish the proper street grade. Cold milling shall be used to remove high spots. Tack coat and leveling courses of asphalt concrete shall be placed to fill low spots and ruts and to re-establish street grades prior to the placement of asphalt concrete overlay. The Contractor shall use cold milling to remove high spots and to provide joints for AC leveling course, in areas as directed by the Engineer. The Contractor shall place tack coat in the areas delineated by the Engineer, and rake the edges of the variable thickness AC leveling course to create smooth feathering. If a quantity of AC leveling course is included in the Bid Schedule, it is a rough estimate for bidding purposes. If Leveling Course is needed, that work shall be directed by the Engineer in the field. The Contractor shall cooperate with the Engineer in placing the leveling course as required to re-establish street grades, and perform the work as directed by the Engineer.
302-5.9.2 Joints.
Replace the first paragraph in this subsection with the following:
08/12/2025
C9
160 of 364
150
Longitudinal joints between successive runs shall be placed to match striped lane lines. If this placement pattern cannot be met, joints between successive runs shall be in the center of the driving lane.
302-5.12 Smoothness.
Add the following paragraphs to this subsection:
Contractor shall have a ten foot (10’) straightedge onsite at all times during all paving operations for use in checking the smoothness of the surface.
The finished surface of the asphalt concrete pavement shall be placed three-eighths inch (3/8”) above the gutter lip to allow full compaction of the asphalt at the gutter edge and to prevent damage to the gutter lip caused by the roller.
At curb ramps the finished surface of the asphalt concrete pavement shall be placed one- eighth inch (1/8”) above the gutter lip. If the asphalt concrete surface is more than one-quarter inch (1/4”) above the lip or if the slope of the asphalt concrete surface at the gutter lip exceeds five percent (5%), the Contractor shall grind the pavement until it is equal to or less than five percent (5%) and flush with the gutter lip.
302-5.14 Payment.
302-5.14.5 Asphalt Concrete
Modify the first paragraph of this subsection to read as follows:
302-5.14.5 Asphalt Concrete . Asphalt concrete pavement will be paid for at the Contract Unit Price per Ton as shown in the bid. Quantities of asphalt concrete pavement will be determined by adding up the total of all certified material tickets for asphalt concrete delivered and placed for the Project. The unit price bid for asphalt concrete pavement shall include full compensation for clearing and grubbing, unclassified excavation and fill, cold milling, subgrade preparation and applying tack coat, supplying and placing the base course and surface course asphalt concrete, compacting and finishing the asphalt concrete pavement, and all other related items of work, and no additional compensation will be allowed. Re-setting or adjusting manholes, covers, vaults, valves, boxes or other miscellaneous facilities to grade will be paid for as provided in Subsection 403-5 (“PAYMENT.”).
302-5.14.5 Asphalt Concrete. For the W VISTA WAY PEDESTRIAN IMPROVEMENT PROJECT, asphalt concrete pavement will be paid for at the Contract Unit Price per Ton as shown in the bid. Tonnage quantities of asphalt concrete pavement will be determined by adding up the total of all certified material tickets for asphalt concrete delivered and placed for the Project up to the maximum allowed tonnage as specified in this Subsection minus any tonnage used for temporary asphalt under Subsection 302-5.1 (“General.”). The tonnage of asphalt concrete pavement has been calculated from the square footage of street surface to be paved for a final compacted thickness as per the Plans for AC Overlay, and other thicknesses for street structural sections. The Contractor shall not exceed the theoretical total tonnage calculated based on the 08/12/2025
C9
161 of 364
151
actual surface area of the resurfaced roadway by more than three percent (3%). The Contractor shall coordinate the amount of asphalt concrete pavement installed on a continuous basis with the Inspector so that the final tonnage of asphalt concrete pavement does not exceed the limits specified herein. The Contractor shall adjust and maintain all paving equipment to achieve a final compacted minimum thickness of two inches (2”). Any amount of asphalt concrete pavement installed above three percent (3%) over the bid quantity shall be at the Contractor’s expense. The unit price bid for asphalt concrete pavement shall include full compensation for clearing and grubbing, unclassified excavation and fill, subgrade preparation and applying tack coat, supplying and placing the base course and surface course asphalt concrete, compacting and finishing the asphalt concrete pavement, and all other related items of work, and no additional compensation will be allowed. Re-setting or adjusting manholes, covers, vaults, valves, boxes or other miscellaneous facilities to grade will be paid for as provided in Subsection 403-5 (“Payment.”).
Add the following paragraphs:
The tonnage of all asphalt concrete pavement including two inch asphalt concrete pavement Overlay calculated using a density of asphalt of one hundred sixty pounds per cubic foot (160 lbs./ft3) in the following formula:
Tons of AC = (Area in sq.ft.) x (Thickness in inches) x (Unit Weight in lbs./cu.ft.) / (2000 lbs/ton)
This formula will be used to adjust the tonnage based on the actual density of the asphalt concrete installed. The Contractor and Inspector shall measure the square footage of installed asphalt pavement for each completed section daily and adjust the calculated tonnage by the actual density to determine the theoretical tonnage at a thickness of two inches (2”). The theoretical tonnage will be compared to the certified material tickets for surface course asphalt concrete. The certified material tickets will be paid up to 1.03 times the theoretical tonnage for each section.
For other pavement areas where new structural section of asphalt concrete on aggregate base is being constructed, asphalt concrete pavement on aggregate base will be paid for at the Contract Unit Prices as shown in the bid. Quantities to be measured by the square foot will include all areas where existing asphalt concrete is removed, the street section is excavated to subgrade, the subgrade is prepared, aggregate base is placed and compacted, and asphalt concrete pavement is placed over the base. The unit price bid for this bid item shall include full compensation for clearing and grubbing; saw cutting, cold milling or other method of pavement removal; unclassified excavation fill; subgrade preparation; construction of aggregate base; applying tack coat; supplying and placing the initial asphalt concrete base course pavement; supplying and placing the asphalt concrete surface course; compacting and finishing the asphalt concrete pavement, and all other related items of work, and no additional compensation will be allowed. Re-setting or adjusting manholes, covers, vaults, boxes or other facilities to grade will be paid for as provided in Subsection 403-5 (“Payment.”). The specified thickness will be used to calculate the theoretical quantity, using the same formula as the pavement resurfacing.
302-6 PORTLAND CEMENT CONCRETE PAVEMENT.
302-6.1 General.
08/12/2025
C9
162 of 364
152
Add the following after the first sentence of the first paragraph in this subsection:
Formwork shall be approved by the Engineer before placing concrete. The work shall include, but not be limited to, the saw cutting, removal and disposal of AC and sub-base, sub-grade preparation, base material, compaction, placement, materials, rebar, all labor, tools, equipment and incidentals necessary to do all of the work as specified on the Plans or as directed by the Engineer.
302-7 PAVEMENT FABRIC.
302-7.2 Placement.
302-7.2.1 General.
Add the following paragraph to this subsection:
The surface of the pavement shall be swept to remove debris, then air-blown to remove dust.
Distressed pavement shall be dug out and replaced. High points, edges and joints shall be cold milled. Tack Coat and AC Leveling Course shall be placed to correct low points and ruts. Striping and pavement markers shall be removed. Pavement fabric and tack coat shall be placed over all asphalt areas to receive asphalt overlay to form a bond between the existing and new asphalt concrete, and a waterproof barrier. Pavement fabric shall be applied with a mechanical unit mounted on the front of a tractor and laid without wrinkles.
302-7.2.2 Tack Coat.
302-7.2.2.1 General.
Modify the first sentence of the first paragraph to read as follows:
302-7.2.2.1 General. Tack coat shall be PG 64-10 paving asphalt.
Modify the first sentence of the second paragraph to read as follows:
Tack coat shall be sprayed with a truck-mounted sprayer at the rate of 0.25 +/- 0.02 gallons per square yard (g/sq.yd.) during the day, or a rate of 0.23 +/- 0.02 gallons per square yard (g/sq.yd.) for night work.
302-7.3 Measurement.
Modify the first paragraph to read as follows:
302-7.3 Measurement. Pavement Fabric will be measured by the square foot or square yard as shown in the BID SCHEDULE for the actual pavement area covered. Quantities for payment will exclude required overlaps and waste, and cannot exceed the area of the pavement placed.
Deductions from the measurement of the area will be made for areas that were not covered by pavement fabric before the pavement was placed.
08/12/2025
C9
163 of 364
153
302-7.4 Payment.
Modify the first paragraph to read as follows:
302-7.4 Payment. Payment for Pavement Fabric shall be made at the Contract Unit Price per Square Foot of Square Yard as shown in the Bid Schedule. The Contract Unit Price for pavement fabric shall include cleaning of the existing pavement, tack coat, calibration of the truck-mounted sprayer unit, and furnishing and placing pavement fabric material. If no Bid item is included in the BID SCHEDULE for pavement fabric, payment for pavement fabric will be considered as included in the price bid for the related items of work.
302-9 ASPHALT RUBBER HOT MIX (ARHM).
302-9.4 Rolling.
Modify the first sentence to read as follows:
302-9.4 Rolling. Rolling shall conform to 302-5.10 except that vibratory steel drum rollers using the vibratory mode shall be used for initial breakdown rolling.
SECTION 303 – CONCRETE AND MASONRY CONSTRUCTION
303-1 CONCRETE STRUCTURES.
303-1.1 General.
Add the following paragraph to this subsection:
Concrete footings for traffic signals and street lights and other structures such as steps, ramps and walls shall conform to these Plans, City of Vista Standards, Caltrans Standard Plans and Standard Specifications, the California Building Code (CBC) and the San Diego Regional Standard Drawings (SDRSD). If not otherwise specified in the Caltrans Specifications, concrete footings shall conform to these specifications and shall be approved by the Engineer. Full compensation for all required work to construct concrete footings will be considered as included in the related items of work.
303-4 MASONRY CONSTRUCTION
Add the following new subsection:
303-4.3 Segmental Gravity Block Retaining Walls.
303-4.3.1 Construction.
Add the following new subsection:
08/12/2025
C9
164 of 364
154
303-4.3.1 Construction. The work for (Compac II) Segmental Gravity Block Retaining Wall includes furnishing and constructing the segmental gravity block retaining wall at the locations shown on the Plans. The Contractor shall excavate the base trench twenty-four inches (24”) wide at a depth of fourteen inches (14”). The subgrade of the trench shall be compacted to ninety-five percent (95%) relative compaction and a six inch (6”) layer of aggregate base added, tamped and leveled to form the base-leveling pad. The base-leveling pad shall be constructed such that the resulting top of wall is a continuous smooth profile throughout the entire length of wall. The first course of blocks will be placed on the compacted aggregate base and will remain eight inches (8”) below adjacent grade. The remaining segmental gravity blocks shall then be placed per the manufacturer’s recommendations.
303-4.3.2 Measurement and Payment.
Add the following new subsection:
303-4.3.2 Measurement and Payment. Payment for Segmental Gravity Block Retaining Wall shall be made per the bid price per square foot as shown on the BID SCHEDULE. The height portion of the square footage measurement shall be from the finished grade of the soil or concrete surface at the toe of the wall to the top of the wall. Such price shall include all materials, labor and equipment required to install the wall including the installation of the aggregate base.
303-5 CONCRETE CURBS, WALKS, GUTTERS, CROSS GUTTERS, ALLY INTERSECTIONS, ACCESS RAMPS, AND DRIVEWAYS.
303-5.1 Requirements.
303-5.1.1 General.
Modify the second paragraph of this subsection to read as follows:
Unless otherwise prescribed in Subsection 303-5.1.3 (“Driveway Entrances.”), the minimum thickness of walks shall be four inches (4”). The height of curbs and the thickness of gutters, cross gutters, alley intersections, curb ramps and driveway aprons shall be as shown on the Plans.
303-5.1.2 Drainage Outlets Through Curb.
Modify the first paragraph of this subsection to read as follows:
Drains shall be constructed beneath the sidewalk as shown in SDRSD No. D-27 (“SIDEWALK UNDERDRAIN PIPE”) to connect existing building drains or yard drains along the line of Work through curb outlet sleeves to the gutter, or to serve low areas on adjacent property where pre- existing drainage conditions have been affected by the Work. Each separate parcel shall be provided with a minimum of two (2) drains, one (1) at the low side of the parcel and one (1) at the high side of the driveway, or as shown on the Plans. Payment for all work required to install 08/12/2025
C9
165 of 364
155
curb sleeves and under-sidewalk drains will be considered as included in the related concrete items, and no additional compensation will be allowed therefore.
303-5.1.3 Driveway Entrances.
Add the following paragraphs to this subsection:
Where walk is constructed adjacent to driveways, both commercial and residential, provisions shall be made for an accessible walkway within the right-of-way at the back of the sloped driveway apron, with a minimum width of forty-eight inches (48”) and a maximum cross slope of two percent (2.00%). The longitudinal slope of the walk shall match the slope of the street, taken at the gutter lip or gutter flow line.
Type A PCC Driveway Entrance shall be in accordance with City of Vista Municipal Code Section 16.57.090, with smooth transitions to join existing improvements, and no grade breaks exceeding fourteen percent (14%) in eleven feet (11’) for a crest, or twenty-three percent (23%) in eleven feet (11’) for a sag.
303-5.1.4 Curb and Gutter.
Add the following new subsection:
303-5.1.4 Curb and Gutter. PCC Curb and Gutter shall be formed along the gutter lip using specified form material. For projects where curb and gutter is being constructed adjacent to existing pavement, a section of pavement twelve inches (12”) wide, measured from the lip of the gutter, shall be removed to allow for the gutter lip to be formed. The twelve inch (12”) slot shall be paved after the curb and gutter is fully cured, to avoid damage from paving operations.
The Contractor shall exercise great care to construct curbs conforming strictly to ADA standards at locations where curb ramps will be constructed. The curb face shall be depressed to a flush surface with no lip at the flowline. The slope of the asphalt leading up to the curb ramp shall not exceed five percent (5.00%) for a distance of four feet (4’) with a maximum two percent (2.00%) cross slope per SDRSD No. G-32A.
The Contractor shall install eight inch (8”) mow curb in accordance with the San Diego Regional Standard Drawing (SDRSD) No. L-3 (“CONCRETE MOWING STRIP”). All mow curb shall be reinforced as shown on the standard drawing. New mow curb shall have weakened plane joints every ten feet (10’), and expansion joints every thirty feet (30’) and where new mow curb joins other improvements.
The Contractor shall identify locations of water and sewer laterals by stamping a “W” for water service and an “S” for sewer laterals in the green concrete curb after finish troweling is complete. The stamps shall be professionally fabricated, with letters three inches (3”) high.
Expansion joints are required only at beginning and ending of curb returns.
08/12/2025
C9
166 of 364
156
303-5.1.5 Walks.
Add the following new subsection:
303-5.1.5 Walks. Sidewalks shall be constructed in strict conformance with ADA standards.
The cross slope on sidewalks shall in no case exceed two percent (2.00%). The clear width of sidewalk shall not be less than forty-eight inches (48”), measured from the back of curb.
Construction tolerances shall not be a reason to exceed the minimum or maximum standards of the ADA. The width of the top of the curb cannot be counted as part of the sidewalk clearance.
If a monolithic retaining curb at the back of curb ramp or sidewalk with a maximum height of six inches (6”) is required to minimize erosion or match existing improvements or earth, the Contractor shall construct those retaining curbs at the back of the curb ramp or sidewalk to the limits determined by the Engineer. Retaining curbs shall not reduce the sidewalk clear width below the minimum of forty-eight inches (48”).
Where curbs are sleeved to provide connections to the gutter for yard drains, new sidewalk shall be constructed with under-sidewalk drains, in accordance with Subsection 303-5.1.2 (“Drainage Outlets Through Curb.”) and SDRSD D-27 (“SIDEWALK UNDERDRAIN PIPE”).
Any irrigation facilities removed or adjusted for the construction of the sidewalk or other work shall be replaced, relocated, or re-configured with similar materials, so that the irrigation system is fully functional. Unless there is a bid item for landscaping and irrigation, payment for this work will be considered as included with other items of work.
Any turf, sod or landscaping removed adjacent to the Work for the construction of the sidewalk shall be replaced with new turf, sod or landscaping of the same type from a commercial nursery. Unless there is a bid item for landscaping and irrigation, payment for this work will be considered as included in the related items of work.
Expansion joints are required only at beginning and ending of curb returns.
303-5.1.6 Curb Ramp.
Add the following new subsection:
303-5.1.6 Curb Ramp. PCC Curb Ramp shall be constructed in strict conformance with ADA standards. The ADA standards are shown in the latest edition of the San Diego Regional Standard Drawings (SDRSD). For the construction of curb ramps, the Contractor shall refer to, and comply with, all of the requirements for curb ramps shown in the most recent version of the SDRSD Nos. G-27 through G-32B (“CURB RAMP”) (inclusive). The City of Vista has developed a checklist of ADA standards for curb ramps, to be used by the Contractor and the Engineer in confirming compliance with ADA standards for sidewalks and any type of curb ramps. The checklist is either included in the appendices to these specifications (see list of Appendices in Table of Contents on Page 2), or is available to the Contractor upon request.
08/12/2025
C9
167 of 364
157
The Contractor shall modify, adjust or relocate any adjacent improvements so the curb ramp can be constructed to ADA Standards. Before the placement of any concrete curb or curb ramp, the Contractor shall notify the Engineer if it appears that the specified maximum slopes will be exceeded due to existing conditions, to allow the Engineer the opportunity to provide direction.
If the Engineer determines that a TYPE C CURB RAMP (per SDRSD No. G-29) must be constructed instead of a TYPE A or TYPE B CURB RAMP (per SDRSD No. G-27), to fit existing conditions or minimize impacts to private property, the Contractor shall construct the alternate type of ramp.
The Engineer shall pay the bid price for the specified ramp if there is no bid price for the alternate ramp.
If a monolithic retaining curb with a maximum height of six inches (6”) is required to minimize erosion or match existing improvements at the back side of the curb ramp, the Contractor shall construct those curbs at the back of the sidewalk to the limits determined by the Engineer, otherwise they may be eliminated. Retaining curbs shall not reduce the clear width of the landing below the minimum of forty-eight inches (48”).
The Contractor shall depress the curb to flush (0” curb face) in front of the curb ramp to meet ADA standards. The Contractor shall construct the road paving or remove and replace sufficient asphalt concrete paving and base to provide a four foot (4’) minimum square landing area, measured from the gutter flowline, where the slopes do not exceed five percent (5%) in any direction per California Building Code (CBC) 1127 B.5.3. The surface of the curb ramp and side flares shall be of contrasting finish from that of the adjacent sidewalk per CBC 1127 B.5.5.
If a diagonal curb ramp on a corner is being constructed at a crossing marked on the pavement, the Contractor shall provide twenty-four inch (24”) long segments of straight curb on each side of the curb ramp, per CBC 1127 B.5.9.
The Contractor shall install a detectible warning surface pad on all pedestrian access ramps and curb ramps leading to hazardous area (e.g. vehicular traffic), as shown on the Plans or in the Standard Plans. The detectable warning surface pad shall extend the full width of the ramp forty-eight inches (48”) minimum and shall measure at least thirty-six inches (36”) along the ramp slope. The detectable warning surface pad or tile shall be securely attached to the surface of the concrete using adhesive and anchors as recommended by the manufacturer of the detectible warning surface. The concrete surface shall be recessed if required by the manufacturer of the detectable warning pad, and the Contractor shall follow all other manufacturer installation instructions. The detectable warning surface pad shall be integrally- colored “DARK GRAY” at all pedestrian access ramps (or curb ramps) on street intersections.
The Contractor shall include in the unit price for Curb Ramps all related costs not covered by other bid items.
303-5.2 Forms.
303-5.2.2 Slip-Forms.
Add the following sentence to the end of the first paragraph in this subsection:
08/12/2025
C9
168 of 364
158
Contractor shall give Engineer the opportunity to confirm the slip-form shoe is set at the correct batter for the concrete curb and gutter.
303-5.5 Finishing.
303-5.5.4 Gutter.
Add the following before the first sentence of the first paragraph in this subsection:
303-5.5.4 Gutter. Cross gutters and spandrels shall be constructed in accordance with the Plans. Prior to acceptance of the valley gutter constructed by the Contractor, a flow test shall be conducted by the Contractor in the presence of the Engineer. Any new work found to be defective shall be repaired or replaced by the Contractor in accordance with Subsection 303-5.7 (“Repairs and Replacements.”).
303-5.7 Repairs and Replacements.
Modify this subsection to read as follows:
303-5.7 Repairs and Replacements . Any new work found to be defective or damaged, cracked, chipped, discolored, improperly finished, heaved, vandalized, or for any other reason does not conform to the specifications, prior to its acceptance, shall be replaced by the Contractor, at the Contractor’s expense, as approved by the Engineer.
The Contractor shall exercise great care in the construction of curb ramps to ensure compliance with the ADA standards. Any curb ramps that do not satisfy the ADA requirements in any aspect, including exceeding the minimum or maximum values by ANY amount, shall be removed and replaced by the Contractor at his expense. Construction tolerances shall not be a reason to exceed the minimum or maximum standards of the ADA.
303-5.9 Measurement and Payment.
Modify this subsection to read as follows:
303-5.9 Measurement and Payment. The BID SCHEDULE lists various items that include concrete construction. Items of work shall be measured and paid for as shown in the Bid.
PCC Curb & Gutter shall be measured and paid for by the linear foot as stated in the BID SCHEDULE. Quantities of curb and gutter will be measured along the line of the curb, around curb returns, and across curb ramps and driveway entrances. Pay quantities for PCC Curb and Gutter will NOT include concrete improvements with monolithic curbs covered by separate items in the bid, such as curb ramps, cross gutters (and spandrels), alley aprons, parking areas and special driveway entrances. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, subgrade preparation, removing and replacing existing pavement to allow forming of the gutter lip, installing joints per SDRSD Nos. G-9 and G-10 (“SIDEWALK JOINT LOCATIONS” & “CONCRETE JOINT DETAILS ”), installing sleeves for drains, and depressing curbs for driveway 08/12/2025
C9
169 of 364
159
entrances and curb ramps, will be considered as included in the linear foot price bid for PCC Curb & Gutter, and no additional compensation will be allowed therefore.
PCC Median Curb (& Gutter), PCC Rolled Curb and PCC Mowing Strips shall be measured and paid for by the linear foot, as shown in the BID SCHEDULE. Quantities will be measured along the centerline of the new median curb (& gutter), rolled curb or mowing strips between adjacent existing concrete improvements. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, subgrade preparation, placing reinforcing steel, installing joints per SDRSD No. L-3 (“CONCRETE MOWING STRIP”) and all other work required to construct the PCC Median Curb (& Gutter), PCC Rolled Curb or PCC Mowing Strips, will be considered as included in the linear foot price bid for PCC Median Curb (& Gutter), PCC Rolled Curb or PCC Mowing Strips and no additional compensation will be allowed therefore.
“PCC Driveway Entrance” of the various types specified, including “Concrete Driveway” per SDRSD G-14A through G-14G, and “Alley-Type Driveway” per City of Vista Standard Drawing SRF- 05A, shall be measured and paid for as stated in the BID SCHEDULE. Quantities of “PCC Driveway Entrance” will be measured to include all concrete flatwork that is thicker than adjacent sidewalk, from the back of the curb to the back of the accessible walkway area across the driveway and between the tops of the wings where the curb height is transitioning. Quantities of “Alley-Type Driveway” will be measured from the lip of the gutter to the back of the accessible walkway area across the driveway, and between the tops of the ramps where the curb height is transitioning. If a monolithic retaining curb is required for the driveway, the top surface quantity of the retaining curb will be added to the quantity of the driveway. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, subgrade preparation, adjusting locations of driveways and widths of wings to meet City of Vista Standards, and installing joints per SDRSD Nos. G-9 and G-10 (“SIDEWALK JOINT LOCATIONS ” and “ CONCRETE JOINT DETAILS ”), will be considered as included in the square foot or lump sum price bid for “PCC Driveway Entrance” or “Alley-Type Driveway”, of each type specified, and no additional compensation will be allowed therefore.
“PCC Pavement” for private driveway or flatwork shall be measured and paid for by the square foot as stated in the BID SCHEDULE. Quantities of “PCC Pavement” will be measured from the limit of the public PCC Driveway Entrance or public Alley-Type Driveway to the point where the new private driveway joins existing improvements, for the full width of the new driveway surface, typically on private property, or to the limits of the new PCC pavement as shown on the Plans. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans including clearing and grubbing, earthwork, subgrade preparation, placing reinforcing steel and dowels, adjusting locations of the removal and replacement limits to match existing joints or reduce the slope of the driveway surface, adjusting the profile of the new driveway surface to join existing improvements with a smooth transition and no sharp grade breaks and installing joints per SDRSD G-9 and G-10 (“SIDEWALK JOINT LOCATIONS” and “CONCRETE JOINT DETAILS”) will be considered as included in the square foot price bid for “PCC Pavement” and no additional compensation will be allowed therefore.
PCC Sidewalk shall be measured and paid for by the square foot as stated in the BID SCHEDULE. Quantities of PCC Sidewalk will be measured from the back of the curb to the back 08/12/2025
C9
170 of 364
160
of the walk, and between adjacent concrete improvements covered by separate items in the bid, such as driveway entrances, curb ramps, cross gutters or alley aprons. The top surface of monolithic retaining curb with a maximum height of six inches (6”) will be included in the quantity of sidewalk. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, grading adjacent swales for drainage, subgrade preparation, placing reinforcing steel and dowels, installing joints per SDRSD Nos. G-9 and G-10 (“SIDEWALK JOINT LOCATIONS” and “CONCRETE JOINT DETAILS”), installing under-sidewalk drain pipes through curb sleeves to the gutter and providing monolithic retaining curbs or toe curbs as shown on the Plans or where designated by the Engineer, will be considered as included in the square foot price bid for PCC Sidewalk and no additional compensation will be allowed therefore.
PCC Curb Ramp shall be constructed in strict conformance with ADA standards and shall be paid for per each as specified on the BID SCHEDULE. The pay limit for each pedestrian access ramp (or curb ramp) will include the area within the measurements from the back of the street curb, up to and including the twelve inch (12”) wide border at the top of the ramp (or ramps) and the ramp wings or integral curbs that make up the side of the curb ramp, which surrounds the truncated dome detectable warning surface pad. Intermediate landings within the limits of the main ramp will be included in the measurement for pedestrian access ramps (or curb ramps).
Concrete flatwork for the top landings, transition areas and ramping areas outside the border surrounding the truncated domes, and additional twelve inch (12”) wide borders at the top of the secondary ramping areas will NOT be included in the measurement for pedestrian access ramps (or curb ramps), but WILL BE measured and paid for with PCC Sidewalk. If integral curbs and hand railings are required for pedestrian access ramps (or curb ramps), that work shall be included in the price paid for pedestrian access ramp (or curb ramp) as shown in the bid. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, subgrade preparation, placing reinforcing steel and dowels, constructing a landing area in the street at the bottom of pedestrian access ramps (or curb ramps), installing detectible warning surface pads, constructing integral curbs and handrails, and strictly complying with all ADA standards, will be considered as included in the per each price bid for PCC Pedestrian Access Ramp (or PCC Curb Ramp) and no additional compensation will be allowed therefore.
PCC Cross gutter shall be measured and paid for by the square foot as stated in the BID SCHEDULE. Quantities of cross gutter will be measured along the line of the gutters and spandrels and include the monolithic curb around curb returns and across curb ramps, between adjacent concrete improvements covered by separate items in the bid, such as curb and gutter and curb ramps. Only the top surface of the monolithic curb will be included in the measurement.
Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans, including clearing and grubbing, earthwork, subgrade preparation, installing joints per SDRSD Nos. G-9 and G-10 (“SIDEWALK JOINT LOCATIONS” and “CONCRETE JOINT DETAILS ”), depressing curbs for curb ramps, constructing a landing area in the spandrel at the bottom of the ramp, shaping the gutter and spandrel for proper drainage so water does not pond in front of the curb ramp landing, and water testing for proper drainage patterns, will be considered as included in the square foot price bid for PCC Cross Gutter and no additional compensation will be allowed therefore.
08/12/2025
C9
171 of 364
161
For other items of work that include concrete construction for which there is no bid item, the cost of such items shall be included in the related Bid Items. Full compensation for any necessary work required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for the related items of work and no additional compensation will be allowed therefore.
SECTION 306 – OPEN TRENCH CONDUIT CONSTRUCTION
306-3.2 Removal of Surface Improvements.
Modify this subsection to read as follows:
306-3.2 Removal of Surface Improvements . Bituminous pavement, concrete pavement, landscaping, fences, curbs, sidewalks, or driveways removed in connection with construction shall be removed and reconstructed in accordance with these specifications.
306-5 DEWATERING.
Add the following paragraphs to this subsection:
The groundwater removal work shall include furnishing, installing, and operating a dewatering system capable of dewatering any excavation for any work in progress or planned, and subsequent removal of such equipment from the site.
The Contractor shall limit the area to be excavated at any one time to that area which can be properly dewatered by the equipment in use. The equipment in use shall be both capable of removing any water that accumulates in the excavation and maintaining the excavation in a dry condition while construction is in progress. The surface of the ground shall be sloped away from the excavation or temporary dikes or pipe culverts provided to prevent surface water from entering the excavation.
Disposal of the water from the dewatering system shall be in such a way as not to damage or overload the existing drainage facilities in the area. Protect from injury any portion of the Work completed or in progress, surfaces of streets, lawns or private property. No water shall be directed across a public street outside the construction limits.
All water encountered during the excavation shall be disposed of by the Contractor in such a manner as will not damage public or private property or create a nuisance or health menace.
The Contractor shall furnish, install, and operate pumps, pipes, appliances, and equipment of sufficient capacity to keep all excavations free from water until the excavation is backfilled, unless otherwise authorized by the Engineer. The Contractor shall provide all means or facilities necessary to conduct water to the pumps.
Discharge of pumped groundwater shall be in conformance with the requirements of the Regional Water Quality Control Board, the County of San Diego Department of Environmental Health, the City of Vista, and other agencies having jurisdiction. The Contractor shall obtain all required permits before pumped water from naturally occurring groundwater or from rainfall is 08/12/2025
C9
172 of 364
162
discharged to any storm drain or sewer. A means shall be provided for desilting the water before discharging it where required by the Engineer or by the terms of the discharge permits.
306-12 BACKFILL.
306-12.1 General.
Add the following after the second paragraph in this subsection:
Material obtained from the project excavations may only be used as backfill after it has been determined to be acceptable and approved by the Geotechnical Engineer and the Engineer.
306-12.2 Backfill for Narrow Trenches.
Modify the first paragraph of this subsection to read as follows:
306-12.2 Backfill for Narrow Trenches. All narrow trenches for electrical and irrigation work shall be backfilled immediately after inspection and approval of the conduit placement by the Agency Inspector to minimize the length of time traffic control is required for the trench work.
Narrow trenches are defined as ten inches (10”) or less in width. Backfill for narrow trenches shall be placed as specified in Subsection 306-12.1 (“General.”) except as modified herein.
Narrow trenches shall be backfilled by use of trench backfill slurry per Subsection 201-1 (“PORTLAND CEMENT CONCRETE. ”), unless otherwise approved by the Engineer. Asphalt Concrete resurfacing of the trench per City of Vista Standard Drawings SRF-08A and SRF-08B (“TRENCH PAVING STANDARD”) may commence with other paving operations.
306-12.4 Jetted Trench Backfill.
306-12.4.2 Compaction Requirements.
Replace the first paragraph in this subsection with the following:
306-12.4.2 Compaction Requirements. Except as specified otherwise, trench bedding and backfill densified thru jetting shall be densified to a minimum ninety percent (90%) relative compaction.
306-14 MEASUREMENT.
306-14.7 Valves, Hydrants, Buried Structures, and Pipeline Appurtenances.
Add the following after the first paragraph in this subsection:
Water valves and fire hydrants shall be installed as shown on the Plans, installed per Vista Irrigation District (VID) standards, and inspected by VID.
Relocate Fire Hydrant shall consist of trenching, removing existing fire hydrant and lateral up to the main line tee, installing a blind flange on the terminated tee, installing new tee on main 08/12/2025
C9
173 of 364
163
line, six-inch (6”) PVC lateral, concrete thrust blocking, PVC elbow, PVC extension spool, break off check valve, extension spool, reinstalling existing fire hydrant to the location shown on the Plans, trench restoration, painting fire hydrant, and other Work necessary to provide a fully functional and operational fire hydrant to VID Standards.
306-14.8 Temporary Resurfacing
Modify this subsection to read as follows:
Unless otherwise specified, temporary resurfacing will not be measured separately for payment.
306-15 PAYMENT.
306-15.9 Temporary Resurfacing.
Modify the first paragraph in this subsection to read as follows:
Full compensation for the furnishing, placing, maintaining, removing, and disposing of temporary resurfacing materials shall be included in the unit price of the underground conduit.
306-15.10 Water Improvements.
Add the following new subsections:
306-15.10 Water Improvements. The BID SCHEDULE lists water improvement bid items for Relocate Fire Hydrant, new Ten Inch (10”) Gate Valve, and new Six Inch (6”) Gate Valve. Payment for these bid items shown on the BID SCHEDULE will be made by the bid price per each and shall include disinfection, testing, depressurizing water main, installing and maintaining highline, and cathodic protection. Such bid price shall include full compensation for these bid items to be fully functional and operational to VID Standards and Water Agencies Standards and no additional compensation will be allowed therefore.
08/12/2025
C9
174 of 364
164
SECTION 314 – TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS,
AND PAVEMENT MARKERS
314-2 REMOVAL OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS. 314-2.1 General.
Replace the first sentence in the first paragraph with the following:
The Contractor shall remove all existing traffic striping, including existing striping that has been painted over with black paint, and pavement markings by wet or dry sandblasting, high velocity water jet, grinding, or other methods to accommodate the final pavement striping and markings to the fullest extent possible from the pavement that does not materially damage the surface or texture of the pavement or surfacing. Sand or other material deposited on the pavement as a result of removing traffic stripes and markings shall be removed as the Work progresses. Accumulations of sand or other material, which might interfere with drainage or might constitute a hazard to traffic, will not be permitted.
Add the following paragraph:
For resurfacing projects, yellow thermoplastic containing lead may be left in place and paved over if possible, to avoid issues related to removing and disposing of hazardous materials. If yellow thermoplastic must be removed, the Contractor shall handle and dispose of the material as lead-bearing hazardous waste.
314-2.2 Measurement.
Delete this subsection in its entirety.
314-2.3 Payment.
Replace this subsection in its entirety with the following:
314-2.3 Payment. Payment for removal of traffic striping, curb markings, and pavement markings will be made at the Lump Sum price and included in the bid item for “Final Signing and Striping (includes striping & sign removals and relocations)” and no additional compensation will be allowed.
314-3 REMOVAL OF PAVEMENT MARKERS.
314-3.1 General.
Replace the first sentence in the first paragraph with the following:
08/12/2025
C9
175 of 364
165
314-3.1 General. All existing raised pavement markers shall be removed before paving work proceeds and shall be performed in such a manner as to leave the existing pavement undamaged.
314-3.2 Measurement.
Replace this subsection in its entirety with the following:
314-3.2 Measurement. Removal of traffic striping and markings will be measured as a lump sum item.
314-3.3 Payment.
Replace this subsection in its entirety with the following:
314-3.3 Payment. Payment for removal of pavement markers will be considered as included in the Bid item and included in the bid item for “Final Signing and Striping (includes striping & sign removals and relocations)” and no additional compensation will be allowed.
314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS. 314-4.3 Painting Traffic Striping and Curb and Pavement Markings. 314-4.3.1 General.
Replace the first sentence in the first paragraph with the following:
The work shall consist of applying painted (including glass beads) traffic striping, curb and pavement markings, concrete wheel stops, and new red curb and blue curb at the locations shown on the Plans.
Add the following paragraphs:
If a portion of a crosswalk or limit line is disturbed by construction, then the entire crosswalk or limit line shall be removed and replaced, or restriped.
All striping, RPM’s, and pavement markings that are disturbed by construction shall be replaced. If the Plans or Project Exhibits show striping plans, all interfering striping and marking shall be removed, and new striping and marking shall be installed as shown on the plans. If no striping plans are provided, existing striping shall be replaced in kind.
All intersection limit lines, pavement legends, and crosswalks to be replaced shall be thermoplastic. Other striping shall be painted. New raised pavement markers shall be installed as required by the California Manual on Uniform Traffic Control Devices and the Caltrans Standard Plans, even if they were not previously on the street. Blue raised reflective pavement markers shall be installed at all fire hydrants.
08/12/2025
C9
176 of 364
166
The locations of all signs, including those to be relocated or replaced, must be approved by the Traffic Engineering Division of the Engineering Department before placement. All signs shall be installed on metal sign posts, unless wood posts are specified. If wood posts are called out on the Plan, the posts shall be four inch by four inch (4” x 4”) pressure-treated unpainted wood, anchored in undisturbed soil a minimum of twenty-four inches (24”) below finished grade and backfilled with post-hole concrete above twenty inches (20”) of sand). If in sidewalk area, wood post backfill shall be four inches (4”) of concrete above twenty inches (20”) of sand or gravel, inside an eight inch diameter (8”ø) PVC sleeve. The installation of wood sign posts shall be rejected if posts are damaged, bent or splintered. Technical Provisions from these specifications shall take precedence over other specifications. If not otherwise specified, the work required for Traffic Striping and Signing shall conform to these specifications.
For the W VISTA WAY PEDESTRIAN IMPROVEMENTS PROJECT , all signs installed on new posts shall be installed per the Plans. In addition, all sign posts installed in concrete sidewalk or other hardscape shall be installed per City of Vista Standard Drawing TRF-06 (“SIGN POST FOOTING IN HARDSCAPE”).
314-4.3.7 Payment.
Replace the subsection in its entirety with the following:
314-4.3.7 Payment. The quantities of traffic striping, signing and pavement markings shall be measured as a lump sum, complete in place, as shown on the Plans, and as specified in the bid item “Final Signing and Striping”. Payment for bid items related to all striping, signing and pavement markings shall be at the lump sum or unit prices specified in the in the bid item “Final Signing and Striping” and shall constitute full compensation for all materials, labor, equipment, tools, mobilization, clearing and grubbing, excavation, placing and removing temporary striping and striping tabs, painting legends, raised pavement markers and pavement markings, salvaging signs and delivering them to the Agency’s Public Works Yard at 1165 E. Taylor Street, installing new signs on new and existing posts or poles, providing, painting and installing concrete wheel stops, painting new red curb and blue curb, painting all parking stalls, handicap legends, and incidentals necessary as specified, and no additional compensation will be allowed.
PART 4 – EXISTING IMPROVEMENTS
SECTION 400 – PROTECTION AND RESTORATION
400-1 GENERAL.
Add the following paragraphs:
The Contractor shall exercise due care to avoid injury to existing improvements or facilities, utility facilities, signage, adjacent property, trees, turf, lawn and shrubbery that are to be relocated or not to be removed.
08/12/2025
C9
177 of 364
167
All trees, turf, lawn, and shrubbery that are not to be removed, and pole lines, fences, signs, survey markers and monuments, buildings and structures, conduits, pipelines under or above ground, sewer and waterlines, highway or street signs and facilities, and any other improvements or facilities within or adjacent to the Work shall be protected from damage. The Contractor shall provide and install suitable safeguards to protect such objects from damage. Relocations, repairs, replacements or reestablishments shall be equal to the existing improvements and shall match such improvements in finish and dimensions unless otherwise specified as approved by the Engineer.
In addition to any requirements imposed by law, the Contractor shall shore up, brace, underpin, and protect, as may be necessary, all foundations and other parts of all existing structures, and all portions of other existing facilities including waterlines, storm drains, and sewer lines, adjacent to and adjoining the site of the Work, which are in any way affected by the excavations or other operations connected with the performance of the Work.
The Contractor shall maintain all existing roadside mailboxes and official signs other than those called for removal, including but not limited to directional, warning, advisory, regulatory and street markers. The mailboxes and signs shall be maintained in an erect and functional position and condition at all times during the construction period in either temporary or permanent location as designated by the Engineer. Any of these facilities which are damaged or lost shall be replaced by the Contractor at no cost to the Agency.
The Contractor shall maintain in operation all existing traffic signals and street lighting for the benefit of the public during the progress of the Work. Existing electric services, traffic signal equipment, traffic signs, and street lights that are being replaced or relocated shall remain in service until the replacement facilities are installed and operational or useable).
All costs involved in protection and restoration of existing improvements shall be included in related items of work and no additional compensation shall be allowed therefore.
SECTION 401 – REMOVAL
401-1 GENERAL
Delete this subsection in its entirety and replace with the following:
Unless otherwise specified, materials removed shall be considered the property of the Contractor and shall be properly disposed of outside the Work area by the Contractor. The Work area shall be left with a neat and finished appearance.
401-2 ASPHALT CONCRETE PAVEMENT.
Delete this subsection in its entirety and replace with the following:
Bituminous pavement and all paving fabric within the prescribed thickness to be removed shall be removed to clean, straight lines. Sawcutting of edges to be joined is required, unless the 08/12/2025
C9
178 of 364
168
entire pavement section is removed by cold milling. Where only the surface of existing bituminous pavement is to be removed, the method of removal shall be cold milling or other method approved by the Engineer, and a minimum laying depth of one and one-half inches (1- 1/2”) of new pavement material shall be provided at the edge of new pavement. Where new bituminous pavement adjoins existing pavement, either at a trench or a section where pavement has been removed or is being widened, the edges where new pavement meets existing pavement shall be trimmed to neat straight lines and cold milled a minimum of one and one-half inches (1-1/2”) deep for a minimum of six inches (6”) wide from the edge before paving or resurfacing, to ensure that all surfaces being paved or resurfaced are accessible to the rollers used to compact the subgrade or paving materials, and to provide an overlay key at the join line.
401-3 CONCRETE AND MASONRY IMPROVEMENTS.
401-3.1 Concrete Pavement.
Modify the first two sentences of this subsection to read as follows:
Concrete pavement shall be removed to neatly sawed edges. Sawcuts shall be made to a minimum depth of three inches (3”).
401-3.2 Concrete Curb, Walk, Gutters, Cross Gutters, Curb Ramps, Driveway, and Alley Intersections.
Modify the first sentence of this subsection to read as follows:
Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of three inches (3”).
Modify the last sentence of this subsection to read as follows:
Curb and gutter shall be sawed to a minimum depth of three inches (3”), or otherwise as required to prevent damage to the adjacent concrete to remain, on a neat line at right angles to the curb face.
SECTION 402 – UTILITIES
402-1 LOCATION.
402-1.1 General.
Modify the first sentence of the second paragraph of this subsection to read as follows:
At least two (2) Working Days (48 hours minimum), but not more than fourteen (14) days, prior to any potholing or excavating, the Contractor shall contact Underground Service Alert of Southern California at 811-422-4133 or 800-422-4133 for a Dig Alert I.D. Number and shall ensure that all existing underground utilities have been marked by their owners prior to any 08/12/2025
C9
179 of 364
169
potholing or excavating. Section 4216 / 4217 of the Government Code requires a Dig Alert I.D.
Number to be issued before a “Permit to Excavate” will be valid.
Replace the third, fourth, and fifth paragraph with the following:
Unless specified otherwise as previously potholed, elevations shown on the Plans for existing utilities are based on a search of record information available during the design only and are solely for the Contractor’s convenience. The Agency does not warrant the accuracy of the completeness of the location, elevation or type of existing utilities and substructures shown on the Plans. The Contractor shall pothole (or by other suitable methods) and determine the location and depth of all utilities marked by their owners, and of all service connections and laterals, which may affect or be affected by the Contractor’s operations. The Contractor shall provide all survey necessary to locate the proposed alignment for potholing purposes. Said potholing shall be done ahead of trench excavation and pipe laying such that the information on horizontal location and depth, in the form of a tabulated pothole report with utility type, stations, top of pipe elevation, and clearance from proposed facility profile, shall be given to the Engineer at least fourteen (14) Working Days ahead of trench excavation or other construction but not greater than thirty (30) Working Days ahead of construction in that area. The Contractor shall pothole all underground utilities which are shown on the Plans, or marked in the field by utility owners, as being within five feet (5’) horizontal distance from the edge of any planned Project sewer main or lateral, water main or service, storm drain, electrical conduit, gas main, telephone and cable TV conduit, fiber optic conduit or irrigation conduit alignment, and which are within the trench excavation section or above the planned Project facility. The potholes shall be at all crossings of each utility and at one hundred foot (100’) intervals along each parallel utility. The Contractor shall refill these potholes immediately after establishing those locations. The refilling shall conform to the relative compaction requirements for trenches. In the event obstructions not shown on the Plans are encountered during the progress of the Work which will require alterations to the Plans, or if potholing indicates utilities are located other than as shown on the Plans, the Engineer shall change the Plans and order the necessary deviation from the Project planned line and grade. The Contractor shall not make any deviation from the specified line and grade without approval by the Engineer. Should any deviations in the line and grade be permitted by the Engineer at the request of the Contractor, any additional costs for thrust blocks, valves, concrete, or other additional costs shall be borne by the Contractor. Full compensation for such work shall be considered as included in the prices bid for other items of work. No extension of time or additional compensation will be made for delays caused by failure of the Contractor to complete necessary potholing in a timely manner. The Contractor shall bear the cost of repairing or replacing any existing facility damaged by his potholing work, and shall have affected services back in operation within four (4) hours of interruption.
402-1.2 Payment
Replace the subsection with the following:
402-1.2 Payment. The lump sum price for Utility Potholing in the BID SCHEDULE shall include all labor, materials, and equipment necessary to perform the work and document the results, and no additional compensation will be allowed. If no bid item is shown in the BID 08/12/2025
C9
180 of 364
170
SCHEDULE the payment is considered to be included in the prices bid for various related items of the Work.
402-2 PROTECTION.
Modify the second paragraph to read:
The Contractor shall furnish and place the necessary protection at its expense to ensure support of utilities located as shown on the Plans or in accordance with 402-1. Any damage to a utility shall be repaired by the Contractor to the satisfaction of the organization owning the facility at no additional cost to the Agency. The Agency reserves the right, if so requested by the utility owner, to permit the utility owner to repair such damage, and all expenses of whatever nature arising from such damage shall be borne by the Contractor.
Modify the third paragraph to read:
Upon learning of the existence and location of any underground utility main structures omitted from or shown incorrectly on the Plans, the Contractor shall immediately notify the Engineer and utility owner in writing. When authorized by the Engineer, support or protection of the utility main substructure will be paid for as provided in Subsection 7-3 or 7-4.
Add the following paragraph to this subsection:
During construction of the Work, some of the existing utilities may fall within the prism of trenches. If the existing utility does fall within the Contractor’s trenches, the utility involved shall be supported properly by the Contractor to the satisfaction of the utility owner. The method of support of the utility, precautions to be taken during trench backfill and compaction, etc., shall be per the utility owner’s requirements. The cost to support and protect existing utilities shall be included in the various bid items and no additional compensation shall be allowed. The Contractor shall contact the utility owner should it anticipate such exposure of any of the existing utilities.
402-4 RELOCATION.
Modify the third paragraph to read:
The Contractor shall alter, relocate, or reconstruct all fire hydrants, traffic signal and street light pullboxes, sewer cleanouts and manholes, storm drain cleanouts and manholes, and other surface and subsurface structures owned by the City of Vista or by the City of Oceanside, or those facilities required in the Plans or Specifications to be altered, relocated, reconstructed, or adjusted to grade. Payment for this work shall be as shown in the BID SCHEDULE. If no item is included in the Bid for this work, the cost for this work shall be included in the related items of Work. Temporary or permanent relocation or alteration of utilities requested by the Contractor for its convenience shall be its responsibility and it shall make all arrangements and bear all costs.
08/12/2025
C9
181 of 364
171
All water valve covers and meter boxes owned by VID; CP Test Station covers; electrical utility vaults and transformers; gas utility valve covers; telecommunication vaults, manholes and risers; and other surface and subsurface structures, not owned by the City of Vista, or required in the Plans or Specifications to be relocated or adjusted to grade “By Others”, shall be relocated or adjusted to grade by the owner of the respective utility. The Contractor shall notify each utility owner a minimum of two (2) Working Days before commencing the Work near their facilities.
Modify the fourth paragraph to read:
The utility owner will alter or relocate service connections as necessary within the limits of the Work or within temporary construction or slope easements. For sewer and water services, the Contractor shall arrange for the alteration or relocation of service connections as necessary between the sewer main or the water meter and property line, or between the sewer main or the water meter and the limits of temporary construction or slope easements. In all cases of alteration or relocation of service connections, the Contractor shall notify residences being affected a minimum of four (4) hours prior to said alteration or relocation, and service connections shall be returned to service in no more than four (4) hours. Payment for the alteration or relocation of sewer or water service connections shall be as shown in the Bid Schedule. If no item is included in the Bid for this work, the cost of this relocation shall be included in the Bid for the items of Work necessitating such relocation. Payment for the relocation of other utility service connections, when directed by the Engineer, shall be in accordance with 7-3 or 7-4. Payment will include the restoration of all existing improvements which may be affected thereby. The Contractor may agree with the owner of any utility to disconnect and reconnect interfering service connections. The Agency will not be involved in any such agreement.
402-6 COOPERATION.
Modify the first paragraph to read:
The Contractor shall so conduct its operations as to permit access to the Work site and provide time for utility work to be accomplished during the progress of the Work. The Agency has initiated communication with the appropriate utility companies that provide for the various service connections or utility relocations and adjustments as noted on the Plans. The responsibility for coordination with utility companies will be transferred to the Contractor with the Notice to Proceed and the Contractor shall assume the responsibility for all further coordination with the utility company. The Contractor shall be responsible for maintaining contact with the utility company representatives and providing necessary effort in scheduling utility work so that delays in overall construction schedule are avoided and utility services are in place for connection upon completion of Contract construction.
Add the following paragraphs to this Subsection:
The Contractor shall be responsible for coordinating with utility companies and other public service agencies, as necessary, to assure timely relocation or adjustment of franchise utilities and other facilities within the specified Contract completion time. The Contractor shall schedule his work to accommodate the adjustments, relocations and / or replacements, to avoid 08/12/2025
C9
182 of 364
172
interference with the Contractor's work. The Contractor is required to contact the following organizations (as appropriate for the Project) prior to the start of the Work for updates to the status of the utility work, and for details regarding their respective schedules and requirements (i.e. inspections, etc.).
COMPANY UTILITY
CONT
ACT
TELEP
HONE EMAIL
Vista
Sanitation
District
Sewer Ken
Knatz
760-643-
5416 [email protected]
Buena
Sanitation
District
Sewer Ken
Knatz
760-643-
5416 [email protected]
City of Vista Well Water
City of Vista Storm Drain Chris
Arce
760-643-
5459 [email protected]
City of Vista Traffic Signal Chris
Arce
760-643-
5459 [email protected]
City of Vista Street Lights Chris
Arce
760-643-
5459 [email protected]
City of Vista
Fiber Optic
Communicatio
n
Chris
Arce
760-643-
5459 [email protected]
Vista Irrigation
District Water Enginee
ring
760-597-
3116 [email protected]
City of
Oceanside
Utilities
Water and
Sewer
Cari
Dale [email protected]
City of
Oceanside
Utilities
Contracts
John
McKelve
y
Jmckelvey@oceansideca.
org
Vallecitos
Water District
Water and
Sewer
Lee
Kirby
760-744-
0460 [email protected]
SDG&E Electric Keenon
Holmes
858-654-
8602
kholmes@semprautilities
.com
SDG&E Gas Vincent
Vargas
619-214-
2961 [email protected]
SDG&E Street Lights
Nicole
Brodbec
k
858-636-
6832
Nbrodbeck@semprautilit
ies.com
AT&T
Tele
Communicatio
ns
Kristy
McClask
ey
760-489-
3115 [email protected]
Cox
Communicatio
ns
Tele
Communicatio
ns
Debra
Capter
619-266-
5217 [email protected]
Charter
Communicatio
ns
Tele
Communicatio
ns
Michael
Estrada
619-341-
0516
Michael.Estrada@charter
.com
Charter
Communicatio
ns
Tele
Communicatio
ns
Peter S.
Crampto
n
619-207-
7513
Peter.Crampton@Charte
r.com
Crown Castle
Tele
Communicatio
ns
Andrew
Armstro
ng
760-613-
4671
Andrew.armstrong
@crowncastle.com
NCTD Bus / Railroad Ruth H.
Mbah
760-967-
2834 [email protected]
NCTD Bus / Railroad
ALT
Dept.
Email
[email protected]
08/12/2025
C9
183 of 364
173
The Contractor shall contact the organizations at the beginning of the Project, obtain information on their requirements, provide them a construction schedule that meets their requirements, update the construction schedule on a weekly basis, meet with the company representatives, provide an adequate construction window and a clear area for them to work, document meetings and coordination efforts, provide copies of all correspondence and other documentation to the Agency on a weekly basis, and perform all other necessary coordination work to the satisfaction of the organizations and the Engineer. Notifications by the Contractor shall be in writing, with proof of receipt. Copies of each notification and proof of receipt shall be submitted to the Engineer.
SECTION 403 – MANHOLE ADJUSTMENT AND RECONSTRUCTION
403-1 GENERAL.
Modify this subsection to read as follows:
Utility valve, manhole, and vault frames and covers within an area to be paved or graded will be set by the owners thereof to finished grade. The Contractor shall adjust all storm drain manholes, sewer cleanouts and manholes, water valve sleeves and covers not adjusted by the owner, survey monument covers and other miscellaneous facilities requiring adjustment to the finished grade, unless the adjustment is designated as “By Others”, in accordance with the Contract Documents. Existing manholes shall be ramped with a minimum of ten feet (10’) round with temporary asphalt. Temporary asphalt ramps shall be completely removed prior to asphalt overlay. The area around each manhole must be compacted prior to paving. Contractor shall be responsible to provide all riser rings, grade rings, slip cans and/or sleeves needed for adjustments. The Contractor shall coordinate with the various utility companies to ensure that the utility companies complete their adjustment work prior to the completion of the Work.
The Contractor shall exercise care so that surface materials such as rocks, dirt, and debris do not enter sewer lines, manholes, valve and cleanout sleeves, and other utility facilities. In order to prevent contamination, Contractor shall provide a three-quarter inch (3/4”) thick plywood platform to be placed on the concrete shelf at the bottom of sewer manholes prior to starting adjustment work. The shape of this platform shall conform to the circumference of the inside wall at the shelf elevation. After the manhole had been adjusted, the material accumulated on the plywood shelf along with the plywood shelf shall be removed from the manhole and disposed of in accordance with Subsection 401 (“REMOVAL.”) The Contractor shall remove all debris from the interior of manholes, valve covers, and cleanouts and shall clean all foreign material from the top of the frames and covers. The Contractor shall include all costs in the related items of work, and no additional compensation will be allowed.
Add the following new paragraph to this subsection:
Because VID water facility sleeve and cover adjustments in paved areas must be done as the paving operation proceeds, VID typically has a crew working at the same time the Contractor is performing the paving operations. If VID is not able to perform the work due to an unforeseen circumstance, the Contractor shall adjust those facilities to grade on behalf of VID as the paving 08/12/2025
C9
184 of 364
174
work is being done. Because the quantity of VID covers to be adjusted depends on the availability of VID crews to perform the work, the quantity in the Bid is a rough estimate for bidding purposes only. Stipulated unit prices may be included in the Bid to eliminate for all bidders the risk of including prices for those items of work in the bid and not getting the work.
403-2 MANHOLES IN CONCRETE PAVEMENT.
Modify this subsection to read as follows:
Manholes in asphalt concrete pavement shall be set to finish grade in accordance with provisions of 403-3. In the case of Portland cement concrete pavement, manhole frames shall be set to finish grade before paving. Repaving required as a result of reconstructing or adjusting all manhole and vault frames and covers to grade shall be the responsibility of the Contractor and the cost thereof shall be included in the bid item for pavement.
403-3 MANHOLES IN ASPHALT CONCRETE PAVEMENT.
Add the following paragraphs to this subsection:
The Contractor shall mark out and note locations of all manholes, covers, survey monuments, vaults, and other structures located at the street surface before paving operations commence. As the paving operation proceeds, the Contractor shall mark all manholes and other structures with paint for the owner’s ease in locating them in case of an emergency.
The Contractor shall adjust all storm drain manholes, sewer cleanouts and manholes, water valve sleeves and covers, survey monument covers and other structures requiring adjustment to the finished grade within the areas to be paved or planted in accordance with these Project Specifications and the Standard Specifications. The Contractor shall coordinate the adjustment of the covers with the associated utility owner and make sure the utility covers are uncovered and adjusted to grade immediately after the final paving to maintain access in case of an emergency. Frames and covers may need to be temporarily adjusted to be safe and provide access to the utilities during separate base course and surface course paving operations, but only the final adjustment will be a pay item. Repaving required as a result of reconstruction or adjusting frames and covers to grade shall be the responsibility of the Contractor and the cost thereof shall be included in the bid price paid for the related items of work requiring such adjustment.
Sewer and storm drain manholes belonging to Vista shall be adjusted or reconstructed in accordance with the Vista Sewer System Design Standard Specifications. Manholes are either twenty-four inch (24”) single covers or thirty-six inch (36”) two-piece covers. Some manholes have existing cast-iron adjustment rings. For manholes that are in good condition and have no more than one cast-iron adjustment ring, the Contractor may adjust the manholes to grade using another cast-iron adjustment ring, for a maximum of two cast-iron rings. If the grout around the upper precast concrete riser rings or the frame is defective, the Contractor shall adjust the manhole to grade by removing the cover and frame, salvaging the cast-iron rings, and removing 08/12/2025
C9
185 of 364
175
the precast concrete rings until the grout in the remaining precast concrete rings is in good condition, as determined by the Engineer. Then the Contractor shall adjust the frame and cover to grade using new precast concrete riser rings. If the cover is sitting low in the existing frame or adjustment ring, or the frame or cover is defective, the Contractor shall salvage the existing frame, cover, and rings, supply a new frame and cover, and adjust the new frame and cover to grade using precast concrete riser rings. If any manhole is defective to the extent that it requires fifteen inches or more (15”+) of pre-cast concrete riser rings to adjust the cover to grade, the Contractor shall reconstruct the manhole as described in the Specifications.
The Contractor shall exercise care so that surface materials such as rocks, dirt, and debris do not enter sewer lines, manholes, valve and cleanout sleeves, and other utility structures. In order to prevent contamination, Contractor shall provide a three-quarter inch (3/4”) thick plywood platform to be placed on the concrete shelf at the bottom of sewer manholes prior to cold milling pavement work. The shape of this platform shall conform to the circumference of the inside wall at the shelf elevation. After the manhole had been adjusted, the material accumulated on the plywood shelf along with the plywood shelf shall be removed from the manhole and disposed of in accordance with Section 401 (“REMOVAL.”) The Contractor shall remove all debris from the interior of manholes, valve covers, and cleanouts and shall clean all foreign material from the top of the frames and covers.
Because VID water valve cover cover adjustments in paved areas must be done as the paving operation proceeds, VID typically has a crew working at the same time the Contractor is performing the paving operations. If VID is not able to perform the work due to an unforeseen circumstance, the Contractor shall adjust those facilities to grade on behalf of VID as the paving work is being done. Because the quantity of VID covers to be adjusted depends on the availability of VID crews to perform the work, the quantity in the Bid is a rough estimate for bidding purposes only. Stipulated unit prices may be included in the Bid to eliminate for all bidders the risk of including prices for those items of work in the bid and not getting the work.
Within five (5) Working Days of placing the asphalt concrete, the Contractor shall complete the adjustment of the manholes and miscellaneous utility frames and covers to grade.
Immediately after the overlay operation, the Contractor shall mark all manhole and miscellaneous utility frames and cover locations with paint for ease of locating them in case of an emergency.
The tops of reset manholes and miscellaneous utility frames and covers shall meet the smoothness requirements as specified in Subsection 302-5.12 (“ Smoothness.”) and be reconstructed per the City of Vista Standard Drawing SWR-33 (“ SEWER MANHOLE RECONSTRUCTION”).
403-5 PAYMENT.
Modify this subsection to read as follows:
Payment for adjusting manhole frames and covers to grade, where the difference between the lowest point of manhole riser removal to the final elevation of the top of the frame is less than 15 inches or where the adjustment is accomplished by adjustment rings only, will be made 08/12/2025
C9
186 of 364
176
at the Contract unit price for adjusting each manhole frame or cover, using either cast-iron riser rings or pre-cast concrete grade rings.
Payment for adjusting manhole frames and covers to grade, where the difference between the lowest point of manhole riser removal to the final elevation of the top of the frame is 15 inches or more, will be made at the Contract unit price for reconstructing each manhole frame or cover. The work includes, but is not limited to, performing all necessary demolition, disposal, clearing and grubbing, excavation, base removal and replacement per these specifications, asphalt concrete removal and replacement per these specifications, modification of the manhole, Contractor’s Pollution Liability insurance, Transporters Pollution Liability Insurance, Sewage Spill Prevention and Response Plan, Wastewater Flow Diversion Plan, and all other required appurtenances, and performing all other work required to produce a complete and fully functional sewer manhole system, as shown on the Plans and as specified herein.
If no payment provision for manhole or vault adjustment or reconstruction is made, payment for such work will be considered included in the related items of work, and no additional compensation will be allowed.
SECTION 404 – COLD MILLING
404-1 GENERAL.
Modify the first paragraph of this subsection to read as follows:
The type of pavement and depth to be cold milled shall be as shown on the Plans or Specifications. All paving fabric within the milling depth shall be removed and disposed of properly. The surface after cold milling shall be uniformly grooved or ridged. The outside lines of the milled pavement shall be neat and uniform. The Contractor shall remove existing asphalt concrete overlay or slurry seal material within one foot of the edge of concrete gutters adjacent to any area to be cold milled. The removal procedure and equipment to be used shall be approved by the Engineer.
Add the following paragraphs to this subsection:
For resurfacing, the existing asphalt concrete pavement shall be cold milled for pavement removal, header cuts and edge cuts, as detailed on the Plans and in the City of Vista Standard Cold Milling Details. The Contractor shall cold mill pavement adjacent to all concrete gutters, median curbs, AC Berms, speed humps or bumps, across intersecting side streets, and at the project limits. The cold milled area for edge cuts and header cuts on low-volume side streets will be at the width shown on the Plans, or a minimum of four feet (4’) wide, and tapered from the one and one-half inches (1-1/2”) minimum depth to a depth of zero inches (0”). Header cuts for high-volume side streets and across the main street will be a minimum of ten feet (10’) wide, tapered from one and one-half inches (1-1/2”) minimum depth to zero inch (0”) depth.
The Contractor shall cold mill around drain grates in the street, to maintain positive drainage toward the drainage structure after new asphalt concrete is placed. Prior to cold milling, the 08/12/2025
C9
187 of 364
177
Contractor shall provide covers over all existing storm drain grates and inlets to prevent entry of debris.
The pavement removal thicknesses and resurfacing thicknesses may exceed the thickness of the existing asphalt concrete pavement. The contractor shall remove asphalt concrete, paving fabric, base, subbase, and subgrade materials to the specified depth, using cold milling or other removal methods. The Contractor shall be prepared to perform the required cold milling, removals, subgrade preparation, and compaction work before pavement is replaced, whether the existing asphalt concrete pavement section is thicker or thinner than the specified asphalt concrete pavement section.
Contractor shall furnish one or more cold milling machines operated by experienced workmen. The surface produced shall have a tolerance so that a ten-foot (10’) straight edge laid laterally will indicate variance of less than three-sixteenth of an inch (3/16”). Removal shall consist of: (1) planning and cutting the pavement to form a keyway header cut; and (2) removing the loosened material. Loosened material shall be stored on the property of the Contractor and shall be disposed of off-site at the end of each workday.
Directly following the cold milling operation, all asphalt pavement joints within travel lanes that have vertical separation of more than one-half inch (1/2”) shall be ramped with temporary asphalt concrete. Ramps shall be no less than ten feet (10’) in length from the joint and shall extend across all travel lanes. Temporary asphalt ramps shall be completely removed and disposed of the job site prior to overlay application.
404-8 DISPOSAL OF MILLINGS.
Delete this subsection in its entirety and replace with the following:
Unless otherwise specified, millings including all hazardous and non-hazardous paving fabric, shall be considered the property of the Contractor and shall be properly disposed of off the Work site by the Contractor. Disposal sites may require that the paving fabric be separated from the asphalt concrete prior to acceptance.
Prior to acceptance of the work, the Contractor shall sweep and/or remove all loose material created by the work from streets, gutters, curbs, medians, parkways, sidewalks, intersecting streets, adjacent lots, and driveways.
404-9 TRAFFIC SIGNAL LOOP DETECTORS.
Add the following to this subsection:
The Contractor shall notify the Engineer a minimum of three (3) Working Days prior to the start of cold milling asphalt concrete pavement on any street containing traffic signal loop detectors.
404-10 PAVEMENT TRANSITIONS.
08/12/2025
C9
188 of 364
178
Modify this subsection to read as follows:
404-10 PAVEMENT TRANSITIONS. The Contractor shall trim edges with a saw to neat straight lines at all locations where new asphalt concrete pavement is joining or overlaying existing asphalt pavement. The Contractor shall also cold mill the edge a minimum of one and one-half inches (1 1/2”) deep for a minimum of six inches (6”) wide from the existing edge before paving or resurfacing. These measures are required to ensure that all surfaces being paved or resurfaced are accessible to the rollers used to compact the subgrade or paving materials, and to provide an overlay key at the join line. All temporary structures and vertical joints in the cold- milled area which are transverse to through traffic and greater than one inch (1”) in height, shall be ramped with temporary asphalt concrete pavement as specified in Subsection 306-13.1 (“Temporary Resurfacing. ”). Ramps shall be constructed the same day as cold milling and removed the same day as permanent paving is installed. Ramp dimensions and compaction shall be approved by the Engineer.
404-11 MEASUREMENT.
Modify this subsection to read as follows:
404-11 MEASUREMENT. Quantities of cold milling shall be measured as shown in the Bid Schedule.
404-12 PAYMENT.
Modify this subsection to read as follows:
404-12 PAYMENT. Full compensation for any necessary cold milling, separation of asphalt concrete and paving fabric, disposal of millings, disposal of paving fabric, and construction, removal and disposal of temporary asphalt concrete ramps required to perform the construction operations specified or shown on the Plans will be considered as included in the price bid for “Cold Milling (2" depth)”, and no additional compensation will be allowed therefore.
PART 5 – PIPELINE SYSTEM REHABILITATION
SECTION 500 – PIPELINE REHABILITATION
500-1 GENERAL.
Add the following paragraphs to this subsection to read as follows:
Pipeline rehabilitation construction of existing sewer shall be conducted using one of the following:
08/12/2025
C9
189 of 364
179
1. Cured-In-Place Pipe Liner (CIPP) shall conform to Subsection 500-5.5 (“Cured-In-Place Pipe (CIPP) Liner.”).
2. Folded and Re-formed PVC Pipe Liner shall conform to Subsection 500-5.10 (“Folded and Re-formed PVC Pipe Liner.”).
3. Deformed / Re-formed HDPE Pipe Liner shall conform to Subsection 500-5.7 (“Deformed / Re-formed HDPE Pipe Liner.”).
All structural requirements as they pertain to each specific installation shall be approved by the CITY prior to installation. The Contractor shall comply with all confined space entry, and other safety regulations, including but not limited to CalOSHA, OSHA and NIOSH.
The Contractor shall demonstrate that a minimum of five (5) miles, on a single project, of work similar in scope, has been successfully performed by the Contractor using the Contractor’s proposed rehabilitation system for this Project. Should CIPP be utilized, the past project shall have used the proposed resin and felt combination . The Contractor’s Project Manager and Superintendent shall be assigned full time to this Project and be present in the City while WORK is being performed. The proposed Rehabilitation process shall be proven technology, which is defined as a minimum of 500,000 linear feet of successful wastewater collection system installations in the U.S. and must be documented to the satisfaction of the Agency.
The Rehabilitation installation work done under this specification shall be subject to inspection by the Engineer. All parts of the work shall be accessible to the Engineer. Defective work shall be corrected to the satisfaction of the Engineer.
500-1.1 Design Criteria and Testing Requirements.
Add the following paragraphs to this new subsection to read as follows:
500-1.1 Design Criteria and Testing Requirements. All pipe shall be designed per ASTM 1216 and 1743. All design calculations shall be provided to the Agency in the form of a submittal for review. The lining system utilized shall incorporate a seamless or fused (chemically or heat) seamed liner system between manholes and shall be a tight molded liner with an annulus gap not greater than one-thirty-secondth of an inch (1/32”).
The cut ends of the mainline liner inside manhole shall be fully sealed between host pipe and the liner.
500-2 SUBMITTALS.
Add the following paragraphs to this subsection:
Within ten (10) days of the bid opening, the assumed Contractor (apparent low bidder) shall submit manufacturer’s certificate(s) indicating that the supplied materials meet the requirement 08/12/2025
C9
190 of 364
180
of the Specifications, and a certificate of compliance from an independent, third party lab that proposed resin / tube composite meets the chemical resistance requirements of ASTM D5813 and that the creep reduction factor used for the long term flexural modulus calculation has been verified by testing per ASTM D790.
The installation of the sewer lining and lining of the service connections shall be performed by a Contractor licensed / certified by the manufacturer of the process. The assumed Contractor (apparent low bidder) is required to submit for all manufacturers for which they are licensed / certified a copy of the license and a letter from the manufacturer stating the name, address, point of contact, and telephone number for Agency’s verification. Failure to provide this complete documentation within seven (7) calendar days of receipt of the Agency’s bid opening will be cause for delay of Contract award and will result in the bid being declared non-responsive.
Within ten (10) Working Days of issuance of the bid opening, the assumed Contractor (apparent low bidder) shall submit contractual required documentation that a minimum of five (5) miles, on a single project, of work similar in scope, has been successfully performed by the Contractor and its personnel assigned to the liner installation and curing, utilizing the Contractor’s proposed rehabilitation system for this Project (see appendices (see list of Appendices in Table of Contents on Page 2) for the required format for this submittal). The Contractor shall identify the employees (i.e. Project Manager, Superintendent, Foreman, etc.) that will be assigned to this Project and provide references in the format presented in said appendices (see list of Appendices in Table of Contents on Page 2). The Contractor’s Project Manager and Superintendent shall be assigned full time to this Project and be present while work is being performed.
Should CIPP be utilized, the past system would encompass the proposed resin and felt combination.
Within ten (10) Working Days of the bid opening, the assumed Contractor (apparent low bidder) shall submit contractual required documentation of 500,000 linear feet of successful wastewater collection system installations in the U.S. of the proposed rehabilitation system to satisfy the contractual requirement of the products commercial viability and Contractor’s capability (see appendices (see list of Appendices in Table of Contents on Page 2) for the required format for this submittal).
Within thirty (30) calendar days after Project Award, the Contractor shall submit to the Agency Design Calculations for the pipe liner for approval. The Design Calculations shall be in accordance with ASTM F1216, Appendix X1 for fully deteriorated pipe. The pipe liner shall be designed to support hydraulic, soil, and live loads based on a minimum ten foot (10') burial depth to top of pipe and highway loading per AASHTO. If local conditions impose greater loads, the greater loads shall be used. Local conditions may include depth greater than ten feet (10’), railroad loading, groundwater or other loadings.
Prior to rehabilitation, the Contractor shall submit drawings of construction details and all other submittals per Subsection 3-8 (“ Submittals.”). The shop drawings shall include the location, method of rehabilitation and when applicable, any by-pass locations with sufficient detail to assure that the work can be accomplished without any sewage spill.
08/12/2025
C9
191 of 364
181
At each repair location, at least two (2) Working Days prior to commencing the rehabilitation work, the Contractor shall submit written verification the sewer pipe sections to be rehabilitated are free of obstructions, debris and is suitable for performing the pipe liner restoration repairs.
500-3 CLEANING AND PRELIMINARY INSPECTION.
500-3.2.2 Closed Circuit Television (CCTV) System Equipment.
Delete this subsection in its entirety and replace with the following:
The camera source image shall provide a high resolution video with minimum thirty (30) frames per second producing a continuously-monitored high-quality picture, capable of discerning all major and minor operational and structural defects in the pipelines.
The minimum video bit rate shall be 4.7 Mega bits per second (Mbps) and minimum audio bit rate shall be 128 Kilo bits per second (Kbps).
Video equipment shall include a multi-angle camera capable of spanning 360-degrees circumference and 270-degrees on horizontal axis.
Video inspection shall be performed utilizing one of the following video camera systems:
1. Remote-focus stationary lens cameras;
2. Rotating-lens cameras; or
3. Pan-and-tilt cameras
The video camera shall be mounted on a skid, floatable raft system, or transporter based on the conditions of the pipeline to be recorded. The radial view camera shall be solid-state color and have remote control of the rotational lens. The camera shall be capable of viewing the complete circumference of the pipe and junction structure e.g., manhole. Cameras using mirrors or exposed rotating heads are not acceptable.
The camera shall be operative in 100 percent humidity conditions.
Camera lens shall not be less than 140 degree viewing angle.
Focal distance shall be remotely adjustable through range of six inches (6”) to infinity (∞).
The remote-reading footage counter shall be accurate to less than one percent (1%) error over the length of the particular section of pipeline being inspected. This distance is measured from the centerline of the junctions (e.g., manhole to the centerline of the next manhole).
The camera height shall be adjusted such that the camera lens is always centered in the pipe being inspected. The equipment shall display on the monitor the distance of the camera from the centerline of the starting manhole. Unless otherwise approved by the Engineer, footage measurements shall begin at the centerline of the upstream manhole.
08/12/2025
C9
192 of 364
182
Lighting and camera quality shall produce a clear, in-focus picture of the entire periphery of the pipe for a minimum distance of 6’. Lighting shall be remote-controlled and adjusted to minimize reflective glare and to avoid any dark or shadowy regions appearing on the video file.
The video camera and monitor shall be capable of registering a minimum of four hundred (400) vertical lines and four hundred sixty (460) horizontal lines resolution and be a clear, stable image with no interference.
The video portion of the digital recording shall be free of electrical interference and shall produce a clear and stable image. The audio portion shall be sufficiently free of background and electrical noise providing an oral report that is clear and discernible.
For pipes smaller than six inches in diameter (6”Ø), the Contractor shall use portable long range pan and tilt push cameras with a motorized wheel to push the probe for one hundred eighty (180’) or more feet down the pipes (e.g., laterals).
The Contractor shall provide a camera, capable of extended video recording lengths and operation in remotely accessed areas without direct vehicular access.
500-3.3 Cleaning
Add the following paragraphs to this subsection:
Should hazardous waste material be encountered, the Contractor shall be responsible for developing a health and safety plan for the handling and disposal of hazardous waste. Any hazardous waste material encountered during the Project shall be placed on eight (8) mil plastic sheets and covered with eight (8) mil plastic sheets. The Contractor shall protect any hazardous waste from contaminating the area due to any surface runoff and / or precipitation. The Contractor shall dispose of the waste at a landfill approved by the Agency. If temporary stockpiling of hazardous waste is allowed by the Engineer, the Contractor shall contain the waste in a fenced area that is inaccessible to the general public.
The Contractor shall examine the site conditions to determine if pipeline re-cleaning may be necessary immediately prior to pipeline rehabilitation. Site conditions include, but are not limited to size of pipe, type of pipe, age and conditions of pipe, grade, flow conditions, weather conditions, locations and number of feeder lines connecting to the line to be rehabilitated, and the type of rehabilitation method chosen are all important considerations for determining the maximum allowable time lapse between line cleaning and line rehabilitation.
500-3.4 Closed Circuit Television (CCTV) Inspection.
Delete this subsection in its entirety and replace with the following:
Work under this section shall consist of investigation of pipelines by use of digital closed circuit color video recording to determine condition of lines following cleaning, rehabilitation, and installation of gravity pipelines (when required).
08/12/2025
C9
193 of 364
183
The Contractor in coordination with the Engineer shall video record pipelines to:
1. locate existing laterals,
2. confirm no flow in existing mains prior to abandonment,
3. assess the conditions of the existing pipe segments and laterals after the cleaning process and prior to commencing rehab work, and
4. accept the newly installed or rehabilitated pipelines.
Video inspection shall show with high resolution operational and structural defects (e.g., inflows, sags, offset joints, cracks, roughness, “fins” or folds in the pipelines, complete with audio commentary and inspection log).
The Engineer shall be notified a minimum of two (2) Working Days in advance of video inspecting.
Video inspection shall be performed one pipe reach (e.g., manhole to manhole) at a time.
The Contractor shall video inspect the pipeline with maximum flow diverted from the pipeline.
The pipe reach being inspected shall be isolated from the remainder of the pipelines with the upstream sewage flow bypassed. In the event that the existing flow is interfering with the video operation, a bypass shall be performed by the Contractor to lower the flow volume sufficiently to allow for a clear video picture. Sufficient water shall be supplied to the isolated section to cause drainage reaching the downstream manhole prior to video inspecting. If existing flows are high, pre-construction video inspection can be done with partial flow. Depth of the flow shall not exceed:
1. Pipes 6" - 10": 20% of the pipe diameter.
2. Pipes 12" - 24": 25% of the pipe diameter.
3. Pipes 27" and up: 30% of the pipe diameter.
The camera shall be moved through the pipeline in a downstream direction at a uniform rate by means of power cable winches or self-propelled tractors at each manhole, stopping and rotating the camera head at each lateral connection, defect, or both to allow for adequate evaluation. The Contractor shall stop when necessary to ensure proper documentation of the pipe condition, but in no case shall the camera be pulled at a speed greater than thirty feet (30’) per minute. A clear picture shall be provided looking into each service connection. Both pre- and post-video inspections shall be submitted to the Engineer.
Measurement for location of defects shall be above ground by means of a measuring device.
Footages shown in the digital files shall coincide with horizontal lengths from stationing as shown on the Plans. Footage measurements shall begin at the centerline of the upstream manhole or storm drain access point, unless permission is given by the Engineer to do otherwise.
The Contractor shall clean the sewer mains or storm drains prior to video inspecting as necessary to adequately perform the video recording operations. If the camera will not pass through the entire pipeline section, the Contractor shall reset the equipment at the downstream manhole and attempt to inspect the section of pipe from the opposite direction. If the camera fails to pass through the entire section, it shall be assumed that an obstruction exists. Efforts to 08/12/2025
C9
194 of 364
184
video record that section of pipe shall be temporarily suspended and the Contractor shall notify the Engineer. Upon removal of the obstruction, the Contractor shall complete the inspection.
If an obstruction is encountered during the post-construction video inspection, the Contractor shall remove the obstruction by excavation, repair, or other means approved by the Engineer at the Contractor’s expense, in order that video inspection may continue.
The system used to move the camera through the pipe shall not obstruct the camera’s view.
The Contractor shall calibrate the measuring device each day with a known distance to the satisfaction of the Engineer prior to starting the inspection and video recording process.
The Contractor shall obtain the Engineer’s approval for any additional point repairs.
See the Contract appendices (see list of Appendices in Table of Contents on Page 2) for additional requirements for video inspection deliverables.
500-3.4.1 Reports and Documentation.
Add the following new subsection:
500-3.4.1 Reports and Documentation. The Contractor shall provide a sample submittal at the start of video inspecting work demonstrating the typical video with audio quality and the database to be provided for approval by the Engineer. This submittal shall note any proposed changes to these specifications e.g., video format, data bases, compression, or other condition for review and approval by the Engineer.
Both pre- and post-inspections digital files, log sheets, and reports shall be submitted to the Engineer and will become property of the City.
The Contractor shall use a dual recording system and submit post video inspection files to the Engineer, subsequent to recording.
The Contractor shall use the City’s standard inspection introduction, abbreviations, log sheet forms, and severity code with legend when recording the line segment information.
The inspection reports shall incorporate and utilize a standardized City’s rating system to be provided for comprehensive evaluation of pipeline, manhole condition, or both, i.e., a standardized listing of facility condition and defect codes. Pipe condition and fault information tied to pipe location shall also be recorded in the Report.
Documentation shall consist of color digital video files, log sheets, and a written report detailing the condition of the pipeline and lateral connections and openings. Video files shall be provided on external hard drive or on DVD.
The video files shall be highly compressed, resulting in an anticipated average file size of 10 MB per minute of video. The compression shall be in accordance with Windows Media Video (WMV) format. The compression shall not significantly degrade the still frame quality of the video 08/12/2025
C9
195 of 364
185
or audio signal from the original source video, as judged in a side by side viewing under normal viewing conditions.
The report shall note the time and date of video inspection, street name, upstream and downstream manhole, direction of view, direction of flow, surface material, pipeline length, pipe section length, pipe size, pipe material, lateral connections, DVD number, counter number, and a detailed logging of defects encountered in tabular form.
Each submittal shall include the following:
Visuals
1. Adequate view of the upstream and downstream manholes or storm drain access points.
The direction of the survey upstream or downstream.
2. A pause at and zoom in on the lateral connections for at least fifteen (15) seconds for identification of the condition of the connection.
3. A pause at and zoom in on the identified defects sufficient for identification of the type of problem.
4. Identified fault conditions or defects (use standardized condition and defect codes).
5. Each pipe section shall be identified by street name, nearest intersection, distance from intersection and manhole numbers. If shown on the Plans, station numbers and sheet numbers shall also be identified.
6. A continuous read-out of the camera distance from the starting manhole to the end point at all times.
7. Pipe size.
8. Pipe or liner material.
Audio
1. Date of CCTV inspection.
2. Confirmation of each section to be CCTV inspected (i.e., narrative of manholes, storm access points or station numbers and direction upstream or downstream.
3. Description of pipe size lined on post and final videos, material liner type for post and final videos and pipe joint length.
4. Description and location of each defect.
5. Description and location of each service connection.
6. Include brief but informative comments on data of significance, including, but not limited to, the locations of unusual conditions, type and size of connection, collapsed section, the presence of scale and corrosion, and other discernible features.
7. A continuous read-out of the camera distance from the starting manhole.
Written Documentation
1. Date of CCTV inspection.
2. Printed labels on DVD or storage device number, location information, date of inspection, and other descriptive information.
3. Location, size, material, and length of pipe.
08/12/2025
C9
196 of 364
186
4. Direction of flow and measurement "From" manhole or storm drain access point or station number "To" manhole or storm drain access point or station number.
5. File numbers itemizing individual segments.
6. Sketch showing the street and cross streets where the CCTV inspection was made.
7. Description and location of each defect or deficiency and a list of all proposed repairs.
8. Description and location of each connection.
9. A menu which lists files for each pipe section to be inspected and the date of the inspection.
The reporting software shall be compatible with City’s format requirements. The reporting software shall utilize Microsoft Access database. The reports shall also show all service lateral connection locations.
Video files will be reviewed by the Engineer for focus, lighting, sound, clarity of view, and technical quality. Videos recorded while a camera has flipped over in the process of traveling and the viewing of laterals, obstructions or defects that are blocked by cables, skids or other equipment will not be accepted. Sharp focus, proper lighting, and clear distortion-free viewing during the camera operations shall be maintained. Failure to maintain these conditions will result in the rejection of the submittal.
One file shall be provided for each manhole to manhole pipe segment (or for each manhole to manhole inspection video).
500-3.4.2 Video Inspection Submittals.
Add the following new subsections:
500-3.4.2 Video Inspection Submittals. The Contractor shall make submittals during construction as applicable to the Project. Each video submittal shall be limited to twenty (20) segments. In the event that any deficiencies are discovered by the Engineer, either by the Contractor’s video inspection or the Engineer’s inspection, five (5) Working Days shall be allowed for the Engineer to judge whether the deficiencies or sags are repairable, in place. If the judgment is made that the deficiencies are non-repairable in place, the affected portion(s) shall be reconstructed at no cost to the Agency.
Existing Sewer Mains Proposed To Be Replaced - When video inspecting existing mains proposed to be replaced, the Contractor shall provide the video files and a red-lined set of Plans showing the location of the existing laterals to the Engineer before constructing the new sewer mains. Service lateral video inspection shall be submitted separately.
Post Cleaning Videos Prior To Rehabilitation Of Mains - The Contractor shall video record the pipe segments after the cleaning process has been completed and prior to commencing rehabilitation work. If point repairs are necessary, the Contractor shall identify the location of the proposed point repairs and submit the post cleaning video within five (5) Working Days of completion of the segment cleaning and at least five (5) Working Days prior to commencing the rehab work to obtain prior approval by the Engineer. The Engineer will review each video 08/12/2025
C9
197 of 364
187
submittal within ten (10) Working Days of receiving submittal. The post cleaning video for the remainder of the mainline segments shall be submitted.
Post Cleaning Videos For Rehabilitated Laterals Or Lateral Launch Videos - The Contractor shall video record the lateral segments after the cleaning process has been completed and prior to commencing any work on laterals. The post cleaning video for service lateral launch shall be submitted within 5 Working Days of segment cleaning. The Engineer will review each video submittal within 10 Working Days of receiving each submittal. Each submittal shall be limited to 20 segments. The video inspection shall include inspection of service lateral a minimum of 30’ in length from the mainline or up to the property line unless an obstruction is encountered.
Service Lateral Video - If the property line clean-outs are not known to exist, service lateral video may be obtained with camera equipment designed to launch into the service lateral from the mainline or access from the private property with homeowner’s permission. Each service lateral shall be identified by the FSN of the mainline (when FSN are included in the Contract Documents) and the address of the property which it serves. Failure to comply with these specifications may result in one or more of the following:
1. A delay of the review and approval of the submittal(s).
2. Delay in progress payments.
3. Require the Contractor to repeat video recording the pipelines at no cost to the City.
Final Video Inspection – New sewer mains or storm drains shall be video inspected and recorded not less than twenty-two (22) Working Days after completion of permanent trench restoration and finished grading, but prior to final resurfacing. The Contractor shall review the digital file for any discrepancies or deficiencies in the installation of the pipe or liner. The Contractor shall notify the Engineer at least thirty (30) Working Days in advance of the anticipated date that Acceptance will be requested. If the specified advance notice is not given, Acceptance and bond release may be delayed.
For sewer mains only: The Contractor shall first clean the line with high pressure water jetting equipment and a sewer ball, and then perform tests as specified by the Engineer. The Contractor shall provide for collection of debris from cleaning operation. The Contractor shall dispose of water into an existing sanitary sewer system or pump station.
For sewer mains only: The camera shall stop at each lateral connection, focus on the bottom of the opening and then make one slow clockwise observation around the perimeter of the lateral which clearly shows the quality of the connection. Then, the camera shall focus on the center of the lateral opening for a minimum of fifteen (15) seconds before moving on to also adequately show and document that the saddle has been installed properly for new installations and that the lateral opening has been reestablished for rehabilitation. Each lateral shall be identified by the address of a property which it serves. If the Contractor fails to properly show and document within the database any of the lateral openings, the Contractor will be required to repeat video recording that section of pipeline at no additional cost to the City.
Post-rehabilitation Videos - Post-rehabilitation videos shall be submitted within thirty (30) days of completion of the Work. The final video recording shall clearly show the condition of the liner with ends sealed at the manholes, service lateral and connection seals. The submittal of 08/12/2025
C9
198 of 364
188
this final video recording shall also include MS Access database and marked up Field Book pages or Plans as attachments. Failure to deliver the submittal(s) within the time identified or if a total of more than twenty (20) segments are submitted in a single video may result in one or more of the following:
1. A delay of the review and approval of the submittal(s).
2. Delay in progress payments.
500-3.4.3 Tolerances.
Add the following new subsections:
500-3.4.3 Tolerances. Tolerances encountered following inspection shall be addressed as follows:
1. For new underground sewer or storm drain conduit installations, the maximum operational tolerance for sag shall be one-half inch (1/2”). When video recorded inspection is used to check for sag, a calibrated one-quarter inch diameter (1/4”Ø) steel bar, mounted in front of the camera, shall be used to measure the depth of sag.
2. For rehab work, tolerances shall be in accordance with Subsection 500-5.5.10 (“Defect Tolerances.”)
3. If the Engineer determines that the deficiencies or sags are non-repairable in place, the affected portion(s) shall be reconstructed in accordance with Subsection 3-13 (“COMPLETION, ACCEPTANCE, AND WARRANTY.”)
500-3.4.4 Payment.
Add the following new subsections:
500-3.4.4 Payment. Cleaning and video inspecting pipelines and culverts shall be included in the various Bid items unless separate Bid items have been provided.
500-3.7 Payment.
Add the following paragraph to this subsection:
The external point repair work will be measured and paid for at the unit price bid per each external point repair. Measurement will be made at the pipe and will be based on the length of pipe repaired. The Contractor will be paid for one (1) external point repair for each repair ten feet (10’) or less in length.
500-4 PIPELINE POINT REPAIR AND/OR REPLACEMENT.
500-4.1 General.
08/12/2025
C9
199 of 364
189
Delete the last two sentences of the first paragraph and the second paragraph and replace with the following paragraphs:
The Contractor shall be responsible for repairing the pipeline where external point repairs are deemed necessary from pre-televising inspection and as approved by the Agency.
External point repair work shall include, but not be limited to, locating the point repair through CCTV, locating all interfacing utilities, excavation, dewatering, pipe repairs or placement, backfilling, surface restoration, temporary flow bypassing, sewer dewatering, and traffic control.
If an excavated point repair would have too great an affect on vegetation (as identified by the Agency’s biologist), or if excavation is not possible due to existing walls, buildings, or other structures, the Contractor shall then perform the point repair from the interior of the pipe in accordance with SECTION 501 (“ SERVICE LATERAL CONNECTION SEALING.” ) of these specifications. The Contractor shall televise the pipe prior to rehabilitation and submit to the Engineer their recommendation of, and plan for, internal point repairs.
500-4.8 Repair Methods.
Add the following new subsection:
500-4.8 Repair Methods. One (1) or a combination of the following methods shall be used.
Methods selection shall be subject to approval by the Engineer prior to its installation.
A. Install full circle repair clamp as recommended by the manufacturer and approved by the Engineer. All metallic hardware shall be 316 stainless steel.
B. Install in accordance with manufacturer’s recommendations.
C. Remove defective pipe or fittings to the nearest joint or by cutting perpendicular to the pipe axis to leave a plain end. Prepare a replacement section of like pipe material or as otherwise approved by the Engineer. Make connections using standard joints, repair clamps, couplings, or heat-shrink sleeves.
500-5 LINING
500-5.1 General.
Add the following after the first paragraph in this subsection:
The Contractor shall perform tests on all rehabilitated facilities and submit test results for the review and approval of the Engineer. Pipe sections for sampling shall be produced by the restrained sample method at a location of convenient access, unless other methods are approved in writing by the Engineer. Pipe liner samples shall be prepared and physical properties tested in accordance with either ASTM F1216 or ASTM F1743. The flexural properties must meet or exceed the values listed in Table 1 of the applicable ASTM. Wall thickness of samples shall be determined as described in paragraph 8.1.6 of ASTM F1743. Visual inspection of the 08/12/2025
C9
200 of 364
190
pipe liner shall be in accordance with ASTM F1743. Unless otherwise noted, no separate compensation will be paid for testing; the testing costs are to be included in the related pay items. If the work should fail to pass the tests, it is the Contractor’s responsibility to correct the work and re-test with no additional compensation to the Agency.
If, within the warranty period, any section of the sewer system is not acceptable due to subsequent excessive leakage or any other defects, although originally accepted, the Contractor shall repair or replace the affected portion at no cost to the Agency. It is understood that if the Contractor fails to do such work as required, the Surety shall be liable for said costs of repair or replacement.
All sewers rehabilitated method shall be tested for leakage in accordance with Subsection 306-7.8.2 (“Pressure Testing and Leakage Inspection.”).
500-5.5 Cured-In-Place Pipe (CIPP) Liner.
500-5.5.1 General.
Revise the first sentence in this subsection to read as follows:
CIPP Liner for rehabilitation of pipelines shall use an approved vinyl-ester-resin-impregnated flexible tube installed by an inversion method using a hydrostatic head per ASTM F1216 or a pull in method per ASTM F1743.
Add the following sentence to the first paragraph:
The minimum thickness of flexible tube shall comply with ASTM F1216.
500-5.5.2 Material Composition and Testing.
Add the following to this subsection:
Vinyl-ester resin-impregnated CIPP Liner felt shall have the following minimum physical properties:
PROPERTY ASTM Test
Method
Minimum Physical Property
(psi)
Flexural
Strength D 790 4,500
Flexural
Modulus D 790 Initial: 250,000
Long Term: 125,000
The CIPP shall be designed as per ASTM F 1216, Appendix X1, with the following additional requirements:
The CIPP design shall assume no bonding to the original wall pipe. 08/12/2025
C9
201 of 364
191
External Hydrostatic Design - Acceptable third party testing and verification of the enhancement factor, K, (equation 1 - ASTM F 1216) shall be submitted by the manufacturer and / or liner product.
500-5.5.10 Defect Tolerances.
Add the following new subsection:
500-5.5.10 Defect Tolerances. During post installation video the new liner shall be examined to determine the existence of liner defects. Liner defects shall include but not be limited to fins, wrinkles, imperfections, areas of uncured resin, or areas of incomplete resin impregnation. A fin or wrinkle shall be defined as a defect when it penetrates inside the pipe more than quarter inch (0.25”) from the inside wall curvature of the new liner that is juxtaposed to the fin or wrinkle. A remedial repair and / or replacement action plan shall be submitted by the Contractor to the Agency for review and approval for ANY defect prior to any corrective action.
Failure to obtain Agency’s approval of the corrective plan may result in rejection of the liner and replacement with a new liner or a new pipe (if required).
500-8 SERVICE CONNECTION RE-ESTABLISHMENT.
Delete the second paragraph in its entirety and replace with the following paragraphs:
As part of the summary of work, the Work of this Contract includes the partial lining approximately eight to ten inches (8” – 10”) into the service connection pursuant to SECTION 501 (“SERVICE LATERAL CONNECTION SEALING”) in these specifications. It is the intent to line the pipe without excavation and to provide a permanent lateral sealing in newly relined mainline pipeline.
If the service connection is to be re-established by a remote control device, the Contractor shall have a fully operational backup device on site. After re-establishment, the reconnected service lateral shall be sealed to the liner. The Contractor shall seal the connection to the liner pipe by extending the liner pipe contiguously into the lateral a minimum of eight inches (8”). The Contractor shall have the Engineer onsite during the process to verify the completion of the work.
All costs associated with re-establishing and sealing, by open trench or service lateral connection (SLC), into the service connection shall be included in the unit price bid for service lateral connection and no additional payment shall be made.
SECTION 501 – SERVICE LATERAL CONNECTION SEALING
501-1 GENERAL.
08/12/2025
C9
202 of 364
192
Add the following after the second paragraph in this subsection:
The finished SLC product shall be fabricated from materials which when cured will be chemically resistant to withstand internal exposure to domestic sewage. All constituent materials will be suitable for service in the environment intended. The final product will not deteriorate, corrode, or lose structural strength that will reduce the projected product life.
The structural performance of the finished pipe must be adequate to accommodate all anticipated loads throughout its design life. No cured-in-place pipe rehabilitation technology will be allowed that requires bonding to the existing pipe for any part of its structural strength.
Design methods are to be derived from traditionally accepted pipe formula for various loading parameters and modes of failure. All equations will be modified to include ovality as a design parameter. The design method shall be submitted to the Engineer for approval prior to the Pre-Construction Meeting.
Modify Row 1 of Table 501-1 with the following:
Property
ASTM Test
Method
Results
(psi)
Flexural Stress
D790
4,500
501-6 INSPECTION, TESTING, AND REPAIR OF INSTALLED SLC SEALING SYSTEMS. 501-6.5 Repair.
Add the following paragraphs to this subsection:
500-6.5 Repair. If, within the warranty period, the SLC seals installed in the sewer system are not acceptable due to leakage or any other defects, although originally accepted, the Contractor shall repair or replace the affected portion at no cost to the Agency. It is understood that if the Contractor fails to do such work as required, the Contractor shall be responsible for said costs of repair or replacement.
501-6.6 Deviations.
Add the following new subsection:
501-6.6 Deviations. The Contractor shall submit a unit price proposal for the appropriate size and angle. The deterioration of service laterals is an ongoing process. Should pre- inspection reveal that the SLC cannot be used, the Contractor, upon notifying the Agency's representative, can dig and replace the lateral(s) or advise the Agency's representative it is inadvisable to rehabilitate.
501-8 PAYMENT.
08/12/2025
C9
203 of 364
193
501-8.1 Insitu Point Repairs.
Add the following new subsection:
501-8.1 Insitu Point Repairs. All costs associated with insitu point repairs shall be included in the bid price for insitu point repairs and paid for in accordance with Subsection 500-
3.7(“Payment.”) of these Supplementary Special Provisions.
SECTION 502 - MANHOLE AND STRUCTURE REHABILITATION
502-4 Repair, Resurfacing and Active Infiltration.
502-4.1 General.
Add the following paragraphs to this subsection:
The Contractor shall remove the existing manhole steps, rechannel the manhole base to accommodate upsize, new and/or rehabilitated mains, and replace the existing manhole frame and cover with new per Subsection 206-3.3 (“Manufacturing and Finishing.”) and the Standard Drawings. In addition, in unpaved areas, the top of manholes shall be raised eighteen inches (18”) above ground surface and covers shall be locked per standard drawing SDRSD No. M-4 (“MANHOLE COVER – LOCKING DEVICE. ”). The covers shall be bolted to the grade ring with special 1" (across head) Apenta head bolts, type 5/8" thread (0.625" x 20 UNC thread), 12” long. Bolts to be class 304 stainless steel (see Appendices (see list of Appendices in Table of Contents on Page 2) for detailed drawings). NOTE: Manhole covers shall say CITY OF VISTA SEWER.
If the method and type of materials for manhole rehabilitation are not designated on the plans or specifications, the Contractor shall also rehabilitate the manhole in accordance with Subsection 502-4.3 (“Resurfacing.”).
502-8 PAYMENT.
Add the following paragraphs to this subsection:
The Contractor’s Contract Unit Price bid shall also include the removal of the existing manhole steps, rechanneling the manhole base, high pressure water blasting and cleaning, spark testing and repairs of the new interior manhole lining, and the removal and replacement of the existing manhole frame and covers. In addition, in unpaved areas, the Contract Unit Price bid shall include the raising of the top of manholes and installation of the manhole cover locks.
If the method and type of materials for manhole rehabilitation are not designated on the plans or specifications, the Contract Unit Price shall also include the rehabilitation of the manholes in accordance with Subsection 502-5 (“LINING SYSTEMS.”).
08/12/2025
C9
204 of 364
194
PART 6 – TEMPORARY TRAFFIC CONTROL
SECTION 600 – ACCESS
600-1 GENERAL.
Add the following paragraphs to this subsection:
The Contractor shall make every effort to keep driveways open during working hours. After hours all driveways shall be accessible with smooth and safe crossings through the construction.
In addition, two-directional traffic must be maintained at all times.
Vehicular lane and bicycle lane closures will only be allowed between the hours of 8:30AM and 3:30PM to avoid impacts on commuter traffic and to avoid impacts to the adjacent businesses, local residences and schools.
600-3 PEDESTRIAN ACCESS.
Add the following paragraph to this subsection:
Sidewalks through the work area may be closed temporarily as long as alternate pedestrian access through the adjacent area or on the opposite side of the street is available at ALL times.
The work must be phased so that pedestrian access is maintained at ALL times along street segments and through intersections. This includes performing construction activities only one side of a street segment at a time or on one corner of an intersection at a time to ensure that pedestrian access through the street segment or the intersection is always maintained.
SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION AND MAINTENANCE WORK ZONES
601-1 GENERAL.
Add the following paragraphs to this subsection:
The Contractor shall prepare and submit a traffic control, construction phasing, and detour plan for approval by the Agency, showing how traffic and access will be maintained during the work.
At least two (2) lanes of traffic, one in each direction, must be kept open during construction periods on all streets. The Contractor shall furnish, install and maintain all necessary and appropriate signing and striping for lane closures to accommodate the work zone.
08/12/2025
C9
205 of 364
195
Emergency vehicles shall be permitted to pass through the work area without delay at all times.
Work shall be performed in a portion of the street section while the remainder of the street section is kept open and unobstructed until the newly-constructed improvements are ready for use by traffic. The Contractor shall phase the removal operations so as to maintain the specified traffic lanes on existing pavement until sufficient new pavement is constructed to accommodate the traffic requirements. A smooth, even surface and a condition satisfactory for traffic shall be maintained on the portion of street where the two-directional traffic is being maintained.
The Contractor shall cooperate with local authorities relative to handling local traffic and providing access to necessary services through the area and shall make his own arrangements relative to keeping the working area clear of parked vehicles.
If temporary ‘No Parking’ zones are part of the approved Traffic Control Plan, the Contractor shall be responsible for furnishing and posting temporary ‘No Parking’ signs a minimum of forty- eight (48) hours in advance of work. Signs shall have the correct legend and any other necessary information such as hours of the day; days of the week; dates that the temporary ‘No Parking’ zone applies; and citation of the applicable section of the California Vehicle Code or the Vista Municipal Code. Signs shall be posted at one-hundred foot (100’) maximum intervals along the approved temporary ‘No Parking’ zone. Signs may be attached to existing sign and street light poles in the public right-of-way as approved in the Traffic Control Plan. When necessary to meet the spacing requirement or to ensure sign visibility, the Contractor shall furnish posts or barricades. The Contractor is responsible for the removal of all temporary “No Parking” signs and fasteners or tape used after the Work is completed on each street or alley.
The Contractor shall be responsible for furnishing and posting temporary ‘No Parking’ signs along all streets approved for closure. In addition to other requirements for temporary “No Parking” signs, “No Parking” signs for temporary road closures shall be posted at one-hundred foot (100’) maximum intervals on each side of the street to be closed, at all intersections, and ends of all cul-de-sac streets.
Implementation of traffic control devices per the approved Traffic Control Plan may not begin each workday before the hours specified on the approved Traffic Control Plan. In addition, construction work must be stopped before the end of the approved work period to allow sufficient time for all traffic control devices to be removed and for other devices and measures to be in place and operational as shown on the approved Traffic Control Plans within the specified time restrictions. The Contractor shall make adjustments to the construction staging and provide any required improvements or additional facilities, including temporary trench steel plate covers, temporary asphalt concrete pavement, barricades and delineators, and temporary signing and striping, which are necessary to make the work site functional and safe at all times.
Improvements and facilities necessary to make the work site functional and safe shall be submitted to the Agency’s Traffic engineer for approval as part of the Traffic Control Plan.
Adequate drainage facilities shall be provided to maintain the traveled pavement surface in a condition free from ponding or running water. Water shall not be diverted from existing courses or allowed to pond on private property without the explicit permission, in writing, from the property owner.
08/12/2025
C9
206 of 364
196
Trenches in streets open to traffic shall be provided with temporary pavement surfacing, to maintain a smooth paved travel surface, if the street is not to be provided with permanent pavement surfacing within forty-eight (48) hours after pavement removal. Trench steel plate covers shall not be left in place longer than four (4) consecutive Working Days.
601-2 TEMPORARY TRAFFIC CONTROL PLAN (TCP).
601-2.1 General.
Add the following paragraphs to this subsection:
The Contractor shall be prepared to discuss the traffic control plan and issues related to traffic control and access at the Pre-Construction Meeting. The Contractor shall submit traffic control plans for approval per Subsection 3-8.4 (“Supporting Information.”) at least ten (10) Working Days prior to commencement of work. All phases of the traffic control plans shall be prepared by a California licensed Traffic Control Services Consultant (C31 Contractor’s License – Construction Zone traffic Control Contractor) or a California registered Civil or Traffic Engineer and performed in conformance to the requirements of the latest editions of the California Manual on Uniform Traffic Control Devices (CA MUTCD) for Streets and Highways, Caltrans Standard Specifications and Standard Plans, the Traffic Control Plans included in the latest edition of the San Diego Regional Standard Drawings (SDRSD), and the WATCH Manual (Work Area Traffic Control Handbook). No work shall commence until this plan and each construction phase of the Work that significantly affects existing traffic operations has been reviewed and approved by the Engineer.
The Contractor’s Traffic Control Plan shall list the Working Days and Hours scheduled for each street and each phase of the work, as described in these Specifications.
The relocation and / or installation of traffic and / or parking signs and other directional signage, as required on the Plans, shall conform to the City of Vista Standards, the California Manual on Uniform Traffic Control Devices (CA MUTCD), Caltrans Standard Plans and Standard Specifications, San Diego Regional Standard Drawings (SDRSD), and all current ADA regulations All signs, including those to be relocated or replaced, need to have their new locations approved by the Traffic Engineering Division of the Engineering Department before placement. If not otherwise specified, the work required for Traffic Striping and Signing shall conform to these specifications and those in Section 314.
All signing, including “DETOUR AHEAD” signs and “OPEN DURING CONSTRUCTION” signs shall be proposed by the traffic control plan. The Engineer may direct alteration of the above sign messages and locations.
All traffic lanes shall have a minimum width of eleven feet (11’) unless otherwise specified.
In addition to the lane width specified herein, the Contractor shall maintain a clearance of two feet (2’) feet to curbs, barricades, and other vertical obstructions.
It shall be the Contractor's responsibility to notify the appropriate utility companies listed in these Project Specifications and the other agencies listed below, at least two weeks in advance, 08/12/2025
C9
207 of 364
197
when access to the public right-of-way is altered in any way. Notifications by the Contractor shall be in writing, with proof of receipt. Copies of each notification and proof of receipt shall be submitted to the Engineer.
UTILITY COMPANY / AGENCY PHONE NUMBER
City of Vista Fire Department (Business Office) 760-643-2801 San Diego County Sheriff’s Office (Non-emergency) 760-940-4551 EDCO Waste and Recycling Company (Customer Service) 760-727-1600 City of Vista Engineering Inspection (24 hour answering machine)
760-639-6113
City of Vista Building Division 760-639-6105
City of Vista Building Inspection Request Line (24 hour answering machine)
760-639-6106
City of Vista Parks and Community Services 760-639-6151 North County Transit District (Monica Coria) 760-967-2851 Vista “Out and About” transit service 760-639-6161 x
1537
Vista Unified School District (Maintenance, Operations & Grounds)
760-726-2170 x
92702
United States Post Office (Vista, CA branch) 800-275-8777
601-2.2 Payment.
Add the following paragraph to this subsection:
Full compensation for developing and maintain (single or multi-phase) Traffic Control Plan and Construction Staging and furnishing Project traffic control, including the cost of all barricades, signs, all variable message signs, tools, equipment, incidentals, flagmen, providing notices, asphalt concrete and aggregate base for temporary resurfacing (and its removal), temporary conflicting traffic stripe application and grinded removal, trench steel plate cover installation and removal, and any other safety measures used for the control of traffic, any temporary rerouting of traffic or maintenance of access to properties during the Project construction period shall be paid for by the lump sum price bid as shown on the BID SCHEDULE and no additional compensation will be allowed.
PART 7 – STREET LIGHTING AND TRAFFIC SIGNAL SYSTEMS
SECTION 700 – MATERIALS
700-1 GENERAL.
Add the following paragraph to this subsection:
08/12/2025
C9
208 of 364
198
All electrical components and electrical materials providing and / or using electrical service shall conform to all applicable City of Vista standards / ordinances, SDG&E Standards, Caltrans Standard Specifications, Caltrans Standard Plans, and the City of Vista Guidelines for the Preparation of Traffic Signal Design Plans.
700-3 COMMON COMPONENTS.
700-3.5 Conduit.
Add the following sentence to this subsection:
Conduit shall conform to the provisions in Subsection 86-1.02B, "Conduit and Accessories" of the Caltrans Standard Specifications and these Special Provisions.
700-3.5.2 Rigid Metallic Conduit.
Replace the first sentence in this subsection with the following:
Conduit and conduit fittings shall be Type 1 (Hot-dip galvanized rigid steel) and, unless otherwise stated, a minimum standard two inches (2”) in diameter.
700-3.7 Pull Boxes.
Delete this subsection in its entirety and replace with the following:
700-3.7 Pull Boxes. Pull boxes shall conform to the provisions in Subsection 86-1.02C(2), “Nontraffic Pull Boxes ”, Subsection 86-1.02C(3), “ Traffic Pull Boxes ” and Subsection 86-
1.02C(4) “Tamper Resistant Pull Box” of the Caltrans Standard Specifications and these special provisions.
Pull boxes and covers shall be precast reinforced concrete except when the box is subjected to vehicular traffic loads. Steel reinforcing shall be as regularly used in the standard products of the respective manufacturer.
Cover marking on all new traffic signal pull boxes shall be “Traffic Signal” for traffic signal systems and “Lighting” for street light systems. The marking text shall be between one to three inches (1”-3”) high. Enclosures, covers, and extensions shall be concrete gray color. All covers shall have two (2) 0.375” brass or stainless steel stud bolts with nuts and washers recessed into the cover for securing the cover to the box. Pull box covers shall not contain hold-down bolts or hold-down bolt holes.
Unless otherwise stated, fiber-optic interconnect pull boxes shall be standard size 6E (with extension). All fiber optic pull box lids shall be concrete, one-piece lids. Fiber optic pull box covers shall be marked with the words “SIGNAL COMMUNICATIONS” or “SIGNAL COMMS”.
08/12/2025
C9
209 of 364
199
700-5 TRAFFIC SIGNAL MATERIALS.
700-5.3 Conductors and Cable.
700-5.3.4 Fiber Optic Cable.
700-5.3.4.1 General.
Add the following paragraph to this subsection:
All fiber optic cable on this project shall be from the same manufacturer, who is regularly engaged in the production of this material. The glass used shall be manufactured by Corning or equivalent approved by the Engineer. The Contractor shall submit to the Engineer for approval a certification that the Manufacturer has been engaged in the production of this material for a minimum of three (3) years.
700-5.3.4.1.1 Overview of Fiber Optic Cable Plant.
Add the following new subsection:
700-5.3.4.1.1 Overview of Fiber Optic Cable Plant. This section is intended to provide an overview of the fiber optic cable plant to be installed as part of this project. The plans and all other sections of the specifications shall take precedence over this overview in the event of any conflicts.
This project involves the installation of multi-strand single mode fiber optics cable in new communications conduit. The project plans specify the exact fiber count to be installed in each trunk conduit section.
For the purposes of testing, all fiber strands shall be fusion spliced to factory terminated pigtails within a fully ST populated 48 position FDU located in a McCain Traffic Supply 332 Fiber Optic Data Node. All pigtails shall be factory terminated shall be spliced into pigtails terminated with ST connectors. Jumpers as needed to connect the Fiber Optic Cable from the 332 NODE to the Control Center equipment shall be provided. These pigtails shall be a minimum of 20’ in length. The 332 Node shall be utilized to test the fiber optic cable plant to be installed as part of this project. In addition, all data transceiver and other fiber optic electronics shall be tested at this point prior to connection to the control center by others.
The following is a glossary of terms, which are subsequently utilized in this specification:
Breakout: A "breakout" cable shall be produced by (1) removing the jacket just beyond the last tie-wrap point, (2) exposing 3’ to 6’ of the cable buffers, aramid strength yarn and central fiberglass strength member, and (3) cutting the aramid yarn, central strength member and the buffer tubes to expose the individual glass fibers for splicing or connection to the appropriate device.
Connector: A mechanical device used to align and join two (2) fibers together to provide a means for attaching to and decoupling from a transmitter, receiver, or another fiber (patch panel).
08/12/2025
C9
210 of 364
200
Connectorized: A term that describes the termination point of a fiber after connectors have been affixed.
Couplers: Couplers are devices which mates two (2) fiber optic connectors to facilitate the transition of optical light signals from one connector into another. Couplers may also be referred to as: adapters, feed-thrus, and barrels. They are normally located within FDFs mounted in panels. They may also be used unmounted, to join two (2) simplex fiber runs.
EIA: Stands for Electronic Industries Association.
Fiber Distribution
Unit (FDU): A combination of the Connector Module Housing (CMH) and the Splice Module Housing (SMH) in the same enclosure.
Jumper: A short fiber optic cable that has connectors installed on both ends, and is used for connection within a FDF.
Light Source: A transportable piece of fiber optic test equipment that, when coupled with a power meter, is used to perform end-to-end attenuation testing.
This device contains a stabilized light source operating at the designed wavelength of the system under test. It also couples light from the source into the fiber to be received at the far end by the receiver.
Link: A passive section of the system, the ends of which are to be connected to active components. A link may include splices and couplers.
Mechanical Splice: A device that permanently joins fiber ends to identical or similar fibers.
Mechanical splices are not to be permanently utilized on this project.
Optical Time Domain
Reflectometer
(OTDR): A piece of fiber optic test equipment similar in appearance to an oscilloscope that is used to measure the total amount of power loss between two (2) points. This test instrument provides a visual and printed display of the relative location of system components such as fiber sections, splices and connectors as well as the losses that are attributed to each component.
Patchcord: A short jumper.
Pigtail: Relatively short length of fiber optic cable that is connectorized on only one (1) end.
Power Meter: A transportable piece of fiber optic test equipment that, when coupled with a light source, is used to perform end-to-end attenuation testing. It contains a detector that is sensitive to light at the designed wavelength 08/12/2025
C9
211 of 364
201
of the system under test. Its display indicates the amount of power injected by the light source that arrives at the receiving end of the link.
Segment: A section of fiber optic cable that is not connected to any active device and may or may not have splices per the design.
Splice Closure: A container used to organize and protect splice trays. The container allows splitting or routing of fiber cables from multiple locations. The container is environmentally sealed to protect the fibers.
Splice Module
Housing (SMH): The SMH stores splice trays as well as pigtails and short cable lengths.
Splice Tray: A container used to organize and protect spliced fibers.
Splice Vault: A box with a minimum inside clearance of 30”W x 60”L x 30”D which is used to house splice closures.
700-5.3.4.1.1.1 Single Mode Fiber Optic Outside Plant Cable - General.
Add the following new subsection:
700-5.3.4.1.1.1 Single Mode Fiber Optic Outside Plant Cable - General. Each trunk fiber optic cable for this project shall be waterblocked, loose tube, all-dielectric, gel-free and contain single mode (SM) dual-window (1300 nm and 1550 nm) fibers as shown on the Plans and shall conform to these special provisions.
The cable shall comply with all the requirements of the United States Department of Agriculture Rural Electrification Administration specifications REA-PE-90.
700-5.3.4.1.1.2 Fiber Optic Equipment – Quality Assurance.
Add the following new subsection:
700-5.3.4.1.1.2 Fiber Optic Equipment – Quality Assurance. All work and material described in this section shall meet or exceed the applicable provisions of the following documents:
CFR 1755.900, RUS Specification for Filled Fiber Optic Cables ANSI, C8.47-1983, American National Standard for Polyolefin-insulated Thermoplastic Jacketed Communication Cables
EIA-455-27A, Method of Measuring (Uncoated) Diameter of Optical Waveguide Fibers EIA-455-28B, Method For Measuring Tensile Failure Point of Optical Waveguide Fibers EIA/TIA-455-82A, Water Penetration Test
EIA-455-95, Absolute Optical Power Test for Optical Fibers and Cables EIA-455-103, Buffered Fiber Bend Test
08/12/2025
C9
212 of 364
202
EIA-359-A-1, Special Colors
700-5.3.4.7 Fiber Optic Node Transceiver.
Add the following new subsection:
700-5.3.4.7 Fiber Optic Node Transceiver. The Fiber Node Optic Transceiver shall be micro- processor based and shall be configurable as a fully redundant, fault tolerant, self-healing ring configuration, that provides for un-interruptible communications between network node transceivers, even if a fiber break occurs between one or more transceivers in the ring.
The Fiber Optic Node Transceiver shall operate with single mode fiber at 1310nm. The optical connector shall be ST type.
The Fiber Optic Transceiver shall have AUTOMATIC GAIN CIRCUITRY (AGC) allowing for back to back dynamic range operation for light budgets of up to 30 dB. NO IN-LINE ATTENUATORS WILL BE ALLOWED.
The Fiber Optic Node Transceiver shall be capable of operating from -29F to 165F.
The Fiber Optic Node Transceiver shall be compatible with the Agency’s local traffic signal control and central traffic system control software. The Fiber Optic Node Transceiver shall have a female DB25 connector and shall be compliant with EIA RS-232D \ EIA RS422. A cable shall be provided with each Fiber Optic Transceiver when connected to a 170 controller C-2 port.
The Fiber Optic Node Transceiver shall have a built in Network Management System. Each Transceiver shall be addressable and shall be capable of monitoring the status of any Transceiver from any Transceiver in the Network through the NMS interface port. The NMS shall monitor the condition of the fiber ring, data transmission and the condition of the NMS.
Configuration of all Transceivers in network may be done directly from the MASTER FIBER OPTIC TRANSCEIVER or from a LOCAL FIBER OPTIC TRANSCEIVER. All software required for the Network Management System shall be supplied with the Fiber Optic Node Transceiver. All Fiber Optic Transceiver Network Management System functions shall be transparent to the Agency’s central and local traffic signal software and therefore have no effect on the system while utilizing the NMS functions.
The data transceiver installation shall include all mounting hardware necessary to mount it 72” tall. Nineteen inch (19”) EIA rail Rack Enclosure with removable side panels, solid rear door, smoked plexi-glass front door and rollers. The Transceivers in the Rack Enclosure will be chassis- mounted. The size and mounting arrangements shall be consistent with the space available. It shall be mounted in a manner that allows easy access to all connections and indicators.
The data transceiver shall operate over a temperature range of -29F to 165F.
Power shall be supplied from an existing 120 VAC 5 percent, power source. The data transceiver shall include a power supply, which may be external to the transceiver. The power 08/12/2025
C9
213 of 364
203
supply shall supply all voltages required by the transceiver for operation, and panel indicators visible from the front of the transceiver that show power on and received optical signal present.
The Contractor shall perform pre-installation testing to verify that the transceiver and transceiver are compatible, meet manufacturer’s specifications and the requirements of these specifications.
The Contractor shall furnish and install a power supply, as recommended by the manufacturer, to power to the data transceiver.
700-5.4 Controllers.
700-5.4.4 Components.
700-5.4.4.4 Connectors.
Add the following new paragraphs to this subsection:
The fiber optic connectors shall be the ceramic ferrule ST type for single mode applications.
All fiber optic connectors shall be the 0.1” ST connector ferrule type with Zirconia Ceramic material with a PC (Physical Contact) pre-radiused tip.
The ST connector operating temperature range shall be -40F to +176F. Insertion loss shall not exceed 0.4 dB and the return reflection loss on single mode connectors shall be at least 40 dB. Connection durability shall be less than a 0.2 dB change per 1000 mating cycles. All terminations shall provide a minimum fifty pound (50 lb.) pull-out strength.
700-6 Traffic Signal Street Name Signs.
Add the following new subsection:
700-6 Traffic Signal Street Name Signs. Street name signs on Traffic Signals shall be single- faced, single-sheet, framed aluminum signs with Diamond Grade 3 reverse-screened reflective sheeting, per City of Vista Standard Drawings TRF-03A through -03E. Street name (or message) on the sign shall be as indicated on the Plans, or as specified. One street name sign shall be installed on the mast arm of the signal for each direction of travel.
SECTION 701 – CONSTRUCTION
701-4 DAMAGE TO EXISTING SYSTEMS.
Add the following paragraph to this subsection:
08/12/2025
C9
214 of 364
204
No payment shall be made for incidental repairs needed to improve surfaces or landscaping required for the construction and installation of these systems. Costs for any such efforts shall be included in the cost of related items themselves listed within the bid items.
701-8 FOUNDATIONS, FOUNDATION CAPS AND SLABS.
701-8.6 Payment.
Replace this subsection with the following:
701-8.6 Payment. Payment for foundations, including protection devices, bolt circles, and reinforcement, foundation caps, and slabs, shall be considered as included in the Contract Unit Price or lump sum price in the Bid for the work that required foundations, foundation caps, and slabs.
701-10 STANDARDS, PEDESTALS AND MAST ARMS.
701-10.4 Payment.
Replace this subsection with the following:
701-10.4 Payment. Payment for Standards and/or mast arms or pedestals shall be considered as included in the Contract Unit Price or lump sum price in the Bid for the work that required Standards, mast arms or pedestals.
701-11 PULL BOXES.
701-11.1 General.
Add the following sentence to b) after the fourth paragraph:
Pull boxes shall not be located in or within one foot (1’) of any part of any curb ramp (sloped portions of the ramp; wings; grooves; or landings).
Replace the seventh paragraph with the following:
The Contractor may, at its own expense and subject to the approval of the Engineer, install additional pullboxes or use a larger standard size than that shown or specified, to facilitate the Work.
Add the following paragraphs after the seventh paragraph:
When pull boxes within the limits of concrete work are being relocated or adjusted to grade, new pull boxes and covers to match the existing pull box shall be furnished and installed by the Contractor. If a larger pull box is needed to better accommodate the existing wires or conduit, the Contractor shall furnish and install the larger size pull box as directed by the Engineer.
Fiber optic pull boxes that are being adjusted to grade or relocated must be reconstructed like a new pull box.
08/12/2025
C9
215 of 364
205
When a pull box is subjected to vehicular traffic load, the cover shall be steel embossed with a non-skid pattern. Steel covers have a thirty-six inch (36”) minimum length bonding jumper attached to the systems ground. The box shall rest on a cast in place six inches (6”) wide by six inches (6”) deep minimum concrete footing around the full perimeter of the box.
Pull boxes in existing or future sidewalk areas shall be placed at sidewalk elevation. If there is no existing or future sidewalk in the area and an elevation is not shown on plans, pull boxes shall be set at the same elevation as adjacent signal standard base, service cabinet base or signal controller cabinet base. Pull boxes shall be five feet (5’) from base or as shown on the plans. The pull box elevations for pull boxes installed in median areas shall match the slope of the two adjacent curbs. The pull box elevation for pull boxes installed in planting areas adjacent to sidewalk or sidewalk area shall be at sidewalk grade. Pull box elevation shall be one-tenth of a foot (0.1’) above finished grade for all other areas unless elevation is shown on plans or otherwise directed by the Engineer.
When pull boxes are placed in dirt and planting areas, a concrete collar shall be constructed around the pull box. The top of the pull box shall match slope of the adjacent top of curb. The surface elevation of the collar shall match the surface elevation of the pull box and slope away from the pull box at a rate of 1:50 (2% slope). The width of the collar shall be twelve inches (12”) wide and three and one-half inches (3-½”) in depth.
The Contractor shall clean all pull boxes entered for installation of conduit or wire of all dirt and debris. All pull box lids damaged by Contractor operations shall be replaced at his/her expense. The wiring in these pull boxes shall be neatly bundled, recoiled and reinstalled in the box.
Where existing pull boxes are removed and adjusted to grade, or replaced with new larger boxes, the existing conduits within which the conductors or cables are installed shall be cut back to within two and one-half inches (2-½”) of the edge of the new box. When the conduits are cut, the existing cables or conductors must either be removed or well protected. The ends of the cut conduits must have bushings placed on them. The bushings can be threadless. The existing conductors or cables shall be re-routed to fit in the pull box.
Removed pull boxes shall become property of the Contractor and shall be removed from the project. Removed pull boxes within an improved surface such as concrete sidewalks, will replaced with the improved surface in kind, using methods described within these specifications.
701-11.3 Payment.
Replace this subsection with the following:
701-11.3 Payment. Payment for pull boxes shall be considered as included in the Contract Unit Price or lump sum price in the Bid for the work or items that required pull boxes and no additional compensation shall be allowed.
701-12 CONDUIT.
701-12.1 General.
08/12/2025
C9
216 of 364
206
Add the following paragraphs:
Conduit shall conform to the provisions in Subsection 86-1.02, " MATERIALS", 87-1.03B, “Conduit Installation” of the Caltrans Standard Specifications and these Special Provisions.
All conduit placed under the roadway shall be installed by jacking or drilling methods as provided in Subsection 87-1.03B, “Conduit Installation” of the Caltrans Standard Specifications.
The “Trenching in Pavement Method” may be allowed at the discretion of the Project Engineer or Inspector such as in the event of obstructions or utility conflicts and provided that traffic delay will not exceed five (5) minutes. Depth of trenches for conduit installation shall be thirty inches (30”) minimum depth to top of conduit unless otherwise approved by Project Engineer or Inspector.
Conduit shall have a maximum 45-degree sweep. The minimum conduit bend radii shall be twelve (12) times the cable diameter or twelve inches (12”) minimum. At locations where existing conduit is to be used that does not meet these requirements for sweep and bend radii, conduit shall be replaced with new sweeps or bends with minimum radii.
With the exception for bends to and from pull boxes and foundations the conduit shall run straight and true so that cable pulling forces are minimized.
After cables have been installed, the ends of conduits terminating in pull boxes and/or controller cabinets will be sealed with an approved type of sealing compound.
Cement slurry and trench backfill to be placed as described within these specifications.
Existing conduit to be incorporated into a new system shall be cleaned with cylindrical wire brush, the proper size mandrel shall be verified by the Engineer and the conduit shall be blown out with compressed air. Both old and new cables shall be pulled into the conduit as a unit or as directed by the Engineer.
If pull boxes for traffic detector loops are relocated or adjusted to grade, new conduits shall be installed under the curb and gutter to provide access to the detector loop wires in the street.
Where conduit is installed in sidewalk and walkway areas the Contractor shall replace the sidewalk or walkway paving at the existing joint lines. The replacement surfacing shall match line, grade and material of the adjacent surfaces. This unit Contract price shall include the repair of all concrete, improved surfaces, damaged landscape features, and replacement of existing conduit.
701-12.4 Rigid Non-Metallic Conduit.
Replace the second sentence with the following:
A separate No. 8 AWG, solid bare ground wire and a pull rope conforming to Subsection 700-3.6 (“Pull Tape or Rope.”) shall be inside at the time of installation.
08/12/2025
C9
217 of 364
207
701-12.7 Payment.
Replace the first paragraph of this subsection with the following:
Payment for conduit shall be considered as included in the Contract Unit Price or lump sum price in the Bid for the work that required conduit and no additional compensation shall be allowed.
701-16.7 Luminaires.
701-16.7.4 Payment.
Replace this subsection with the following:
701-16.7.4 Payment. Payment for luminaires and all related equipment and labor shall be considered as included in the related items of work that required luminaires and no additional compensation shall be allowed.
701-16.8 Payment.
Add the following new subsection:
701-16.8 Payment. Payment for street lighting system installation shall be at the Contract Unit Price or lump sum price in the Bid, complete in place and fully functional. The work includes, but is not limited to, performing all necessary sawcutting, clearing and grubbing, structure excavation, trenching, concrete structure construction, backfilling, fine grading, removals, disposals, testing, energizing, and supplying and installing all conduit, wiring, foundations, and all other required appurtenances, and performing all other work required to produce a complete and fully functional system(s) including final connections to electrical panels, energizing, and testing, as shown on the Plans and as specified herein. If no bid item is included, payment for the work shall be considered included in the related items of work, and no additional compensation will be allowed.
Payment for street lighting system modifications shall be at the Contract Unit Price or lump sum price in the Bid, and shall constitute full compensation for all materials, labor, equipment, tools, design engineering and shop drawing preparation, coordination with SDG&E, obtaining City of Vista Electrical Permit, salvaging existing street light pole as shown on the Plans, obtaining Agency-supplied materials and equipment, supplying all other materials needed for a complete installation, clearing and grubbing, earthwork, trenching, foundation work, obtaining approval from SDG&E, record of drawings, and all other work and incidentals necessary to properly construct and design a complete and fully functional street lighting system(s), and no additional compensation will be allowed. If no bid item is included, payment for the work shall be considered as included in related items of work, and no additional compensation will be allowed.
701-17 TRAFFIC SIGNAL CONSTRUCTION.
701-17.1 General.
Add the following paragraphs:
08/12/2025
C9
218 of 364
208
Traffic signal improvements or modifications shall be constructed as shown on the Plans or as specified. The Contractor shall supply all materials, labor, tools and equipment required to install traffic signals at the locations indicated on the Plans. The Contractor shall either protect in place, or remove and replace, all existing traffic signal improvements, utilities, and other existing improvements that interfere with the work. All existing improvements disturbed by the work of the Contractor shall be replaced in a condition equal to, or better than, the condition prior to the work, in the sole opinion of the engineer, at no additional cost to the Agency.
The Contractor shall adjust signal poles to grade when surrounding surfaces are lowered by more than two inches (2”), or when the baseplate of the pole is more than two inches (2”) above the new finished grade. The Contractor shall remove existing grout under the baseplate, adjust the support nuts, adjust conduits and wiring as necessary, re-grout the baseplate, cut off anchor bolts that are excessively long and interfere with base covers, and re-install the baseplate cover.
701-17.2 Controllers.
701-17.2.7 Payment.
Replace this subsection with the following:
701-17.2.7 Payment. Payment for controllers, controller slabs, and all related equipment and labor shall be considered as included in the Contract Unit Price or lump sum price in the Bid for the work that required controllers and no additional compensation will be allowed.
701-17.4.5 Fiber Optic Cable.
701-17.4.5.1 General.
Add the following paragraphs to this subsection:
The Contractor is responsible for all testing and documentation required for approval and acceptance of the production, installation and operation of these materials and equipment. All indicators shall be verified to function correctly.
Attention is directed to “System Testing and Documentation,” elsewhere in these special provisions regarding testing the data transceiver/receivers.
701-17.4.5.1.1 Data Transmission Equipment.
Add the following new subsection:
701-17.4.5.1.1 Data Transmission Equipment. The data transmission equipment shall consist of a fiber optic modem, capable of transmitting a receiving data over the single mode fiber optic cable. For this equipment the Contractor shall install additional 120 volt duplex outlets as required for connection of this equipment to 120 volt power. The connection shall provide isolation and surge protection. If required, additional outlets shall be protected and 08/12/2025
C9
219 of 364
209
controlled through the installation of an additional circuit breaker in the Model 332 Cabinet Power Distribution Assemble. This circuit breaker shall be clearly marked.
In order to ensure compatibility, all new fiber optic modems shall be Vilink Model 230 or an equivalent approved by the City of Vista Engineer. Prior to installation, the operation of all equipment shall be verified using the same type of cable it is to be installed with. The fiber optic path for each data link shall have been tested and verified in accordance with the Contract prior to the data transmitter/receiver installation.
701-17.4.5.1.2 Installation of Data Transmission Equipment in Traffic Signal Cabinet.
Add the following new subsection:
701-17.4.5.1.2 Installation of Data Transmission Equipment in Traffic Signal Cabinet. The data transceiver shall be installed at the cabinet locations shown on the plans. The Contractor shall verify the desired physical space for the data transceiver with the Engineer prior to installation.
The Contractor shall furnish and install single mode fiber optic pig tails to connect the transceiver to the fiber distribution units. The pig tails shall have ST connectors. The Contractor is responsible for ensuring the connectors on the pig tails are fully compatible with those on the fiber distribution unit and the transceiver. The Contractor shall neatly route the pig tail from the transceiver to the distribution unit. No cables shall be installed with a bend radius less than the manufacturer's minimum recommended bending radius.
The data transceiver, also referred to as a fiber optic modem, shall accept data signals and convert them to a signal suitable for launching into one single mode optical fiber. The data transceiver shall fit into a small ruggedized metal package suitable for installation in a traffic signal controller cabinet. The data transceiver shall have a center wavelength in the range from 80nm to 1310nm with an operating temperature from -29F to 165F.
The Contractor shall furnish and install a 12 volt DC 500mA power supply, as recommended by the manufacturer, to power to the data transceiver.
The Contractor shall input a data test signal into the data transceiver and set the optical power measured at the transceiver end of the fiber to the data transceiver sensitivity level. The optical signal shall then be connected to the data transceiver. The Engineer shall then qualitatively assess the data output. The Signal-to-Noise and signal-to-low frequency noise shall be measured and recorded.
701-17.4.5.1.3 Installation of Data Transmission Equipment in the Control Center.
Add the following new subsection:
701-17.4.5.1.3 Installation of Data Transmission Equipment in the Control Center. The data transceiver shall be installed in a standard nineteen-inch (19”) rack mountable card cage. The 08/12/2025
C9
220 of 364
210
data out of the transceiver shall interface with the DB25 and RS232 / 422 port on the backside of the card cage.
The Contractor shall furnish and install single mode fiber optic jumpers to connect the transceiver to the fiber distribution unit. The jumpers shall have factory terminated ST connectors. The Contractor is responsible for ensuring the connectors on the jumpers are fully compatible with those on the fiber distribution unit and the transceiver. The Contractor shall neatly route the jumpers from the transceiver to the distribution unit. No cables shall be installed with a bend radius less than the manufacturer's minimum recommended bending radius.
The data transceiver, also referred to as a fiber modem, shall be connected by optical fiber to form a link having a center wavelength 1310nm. The data link is to provide point-to-point transmission and reception of data from signals using one single mode optical fiber as the transmission medium.
The data transceiver shall receive the optical signal launched into the single mode optical fiber of the corresponding data transceiver. The optical interface to the transceiver shall be an ST-style connector. The data transceiver sensitivity shall be defined as the minimum optical power required operating at the minimum data link performance specifications. If the saturation level of the transceiver is not greater than the transceiver launch power level minus one dB, fixed attenuators shall be installed between the fiber and the transceiver to attenuate the received signal level. The data output interface from the data transceiver shall be a nickel-plated, ST connector.
701-17.4.5.1.4 Installation of Fiber Optic Node Transceiver.
Add the following new subsection:
701-17.4.5.1.4 Installation of Fiber Optic Node Transceiver. The Contractor shall perform pre-installation testing to verify that the transceiver and transceiver are compatible, meet manufacturer’s specifications and the requirements of these specifications.
The Contractor shall furnish and install a power supply, as recommended by the manufacturer, to power to the data transceiver.
The Contractor shall perform pre-installation testing to verify that the transmitter and receiver are compatible, meet manufacturer’s specifications and the requirements of these specifications.
The Contractor shall furnish and install fiber jumpers to connect the receiver to the fiber distribution unit. The Contractor shall neatly train all fiber strands together when routing them along the same path and shall neatly train them along the support rails in the equipment racks.
No cables shall be installed with a bend radius less than the manufacturer’s minimum recommended bending radius.
08/12/2025
C9
221 of 364
211
The Contractor is responsible for all testing and documentation required for approval and acceptance of the production, installation and operation of these materials and equipment. All indicators shall be verified to function correctly.
Attention is directed to “System Testing and Documentation,” elsewhere in these special provisions regarding testing the data transceiver.
701-17.4.5.1.5 Connectors.
Add the following new subsection:
701-17.4.5.1.5 Connectors. Factory test results shall be documented and submitted to the Engineer prior to installing any of the connectors. Single mode connectors shall have a yellow color on the body and/or boot.
Field termination shall be limited to splicing of adjoining trunk cable ends and pigtail breakouts. The pigtails shall utilize factory installed ST connectors.
701-17.4.5.1.6 Fiber Distribution Unit in Cabinets.
Add the following new subsection:
701-17.4.5.1.6 Fiber Distribution Unit in Cabinets. The Contractor shall furnish and install a fiber distribution unit in each traffic signal controller cabinet having fiber installed as shown on the plans. The units shall have provisions for storage of a fiber splice tray capable of housing up to twelve (12) single mode fiber splice tubes.
The fiber distribution unit shall be a rack mount, nineteen inch (19”) size, to be mounted inside the existing Cabinet. Each fiber distribution unit shall be able to hold a minimum of one (1) fiber splice tray. The fiber splice trays shall be metallic and capable of housing twelve (12) single mode fusion splice tubes.
701-17.4.5.1.7 Connection to Fiber Distribution Unit in City Hall / Duplication Center Server Room.
Add the following new subsection:
701-17.4.5.1.7 Connection to Fiber Distribution Unit in City Hall / Duplication Center Server Room. The Contractor shall furnish and install necessary equipment needed to connect the new fiber optic interconnect to the existing fiber distribution unit in the City Hall / Duplication Center Server Room as shown on the plans. Existing slots and splice closures will be used but will likely require additional equipment including, but, not limited to splice trays, connector panels, cords, pigtails, etc., necessary to make full communications connectivity to the existing system.
Provisions for making this connection shall be included in the cost of other related pay items.
08/12/2025
C9
222 of 364
212
701-17.4.5.1.8 Fiber Optic Pig Tail Unit.
Add the following new subsection:
701-17.4.5.1.8 Fiber Optic Pig Tail Unit. The pig tail unit shall be composed of six (6) pre- connectorized fiber optic pig tails. All optical fibers shown on the plans to be connectorized shall be terminated with a ST connector. All cables shall use the same connectors. The connector shall not require a mechanical splice to a factory polished tip. All connectors must be pre- connectorized with pig tails that meet the fiber specifications under “Items 8-13.” The pig tail unit shall be composed of 6-900 micron color coded pig tails. The pig tails shall be two feet (2’) long.
The surface of the fiber end installed in a connector shall be free of scratches, pits and chips at two hundred times (200 x) magnification. No index-matching fluids, gels or anti-reflection coatings shall be applied to the end of the fiber.
The connectors shall conform to the following:
Insertion Loss: 0.25 dB typical, 0.4 dB Maximum.
Reflectance: Less than -50 dB at 1310 nm measured with a back reflection meter. Optical Fiber Nominal Outside Diameter: 0.05 inch.
Tensile Strength: Less than a 0.2 dB change, based upon a 22 lb. load without adhesive.
Temperature Cycling: Less than a 0.2 dB change, based upon -40F to +176F, 100 cycles.
Humidity: Less than 0.2 dB change, 140F at 95% relative humidity for 500 hours. Durability: Less than 0.2 dB change per 1000 insertions, cleaned every 25th insertion.
Undercut/protrusion ±50 nm.
Apex offset less than 1.97 inch.
Connectorized fibers shall be clearly labeled using a labeling convention approved by the Engineer.
The Contractor is responsible for ensuring that existing cable and wiring is reconnected exactly as found and is left fully functional after new cables are installed. The Contractor shall conduct tests, in the presence of the Engineer, to record the operational condition of existing wires and cables prior to removal if it is suspected that such wires or cables are not currently fully functional.
701-17.4.5.2 Splicing.
Add the following paragraphs:
All permanent fiber optic cable splices shall be the fusion type and shall not exceed 0.15 dB loss per splice.
08/12/2025
C9
223 of 364
213
Splices shall be made in pull boxes, splice boxes, or housed in standard cabinets.
Splicing of fiber optic cable shall not be permitted except in emergency conditions.
The field splices shall connect the fibers of two (2) or more fiber optic cable lengths together as indicated on the conductor schedules. These splices shall be placed in a splice tray and these splice tray(s) shall then be placed in the splice enclosure.
The termination splices shall connect the fiber optic cable span ends with pigtails. The termination splices shall be placed in a splice tray. The individual fibers shall be looped one (1) full turn within the splice tray to avoid micro bending. A two-inch (2”) (50.8 mm) minimum bend radius shall be maintained during installation and after final assembly in the optical fiber splice tray. Each bare fiber shall be individually restrained in a splice tray. The optic fibers in buffer tubes and the placement of the bare optical fibers in the splice tray shall be such that there is no discernible tensile force on the optical fiber.
701-17.4.5.2.1 Splice Enclosures.
Add the following new subsection:
701-17.4.5.2.1 Splice Enclosures. The fiber optic field splices shall be enclosed in splice closures, which shall be waterproof, rodent proof and re-enterable. The enclosures shall have sufficient capacity to splice the maximum number of fibers specified on the conductor schedule for each location plus an additional twenty (20%) percent spare capacity.
The splice enclosure shall be complete with splice organizer trays, brackets, plugs, clips, cable ties, seals and sealants as needed. The splice enclosure shall be suitable for pull box installation, as specified. The splice enclosure shall contain splice organizer trays.
A splice enclosure shall be provided at all locations identified on Plans. If the Contractor requires additional splice enclosures to support the pulling plan, these enclosures shall be provided and installed at no additional cost to the City.
701-17.5 Signal Heads.
701-17.5.6 Payment.
Replace this subsection with the following:
701-17.5.6 Payment. Payment for signal heads shall be considered as included in the Contract Unit Price or lump sum price in the Bid for the work that required signal heads.
701-17.6 Detectors.
701-17.6.3 Inductive Loop Detectors.
701-17.6.3.1 General.
08/12/2025
C9
224 of 364
214
Add the following paragraphs to this subsection:
The Contractor shall mark out and document all locations of existing loop detectors, advanced loops, and home runs, before they are taken out of service, so that the existing loops can be replaced in-place. The mark-outs and documentation shall be approved by the inspector before work that disturbs the loops begins. The Contractor shall coordinate with the Inspector to confirm that all loops are working prior to being taken out of service.
New loops shall be installed in the new pavement surface course. Bicycle-sensitive detector loops shall be installed where shown on the Plans, or as specified. After the pavement work is completed, the Contractor shall return the detector loops to full operation.
Inductive loops shall be replaced to be fully functional and operational within twenty-eight (28) calendar days from the day they became non-operational. If this timing requirement is not met, temporary loops or video detection will be required at no extra cost. Temporary loops or video detection will be required until new loop detection is installed and operational.
701-17.6.6 Payment.
Replace this subsection with the following:
701-17.6.6 Payment. Payment for constructing each vehicle detectors shall be at the Contract Unit Price or lump sum price in the Bid for each type of detector in the bid item for “Traffic Signal Modifications”. If no bid item is included, payment for the work shall be considered included in the related items of work that require vehicle detectors, and no additional compensation will be allowed.
701-17.7 Pedestrian Signals.
701-17.7.5 Payment.
Replace this subsection with the following:
Payment for all work related to pedestrian push buttons on traffic signals shall be at the Contract Unit Price or lump sum price in the Bid, complete in place and fully functional in the bid item for “Traffic Signal Modifications”. If no bid item is included, payment for the work shall be considered included in the related items of work that require vehicle detectors, and no additional compensation will be allowed.
701-17.8 Closed-Circuit Television (CCTV) Monitoring System. 701-17.8.1 General.
Add the following new subsection:
701-17.8.1 General. The contractor shall provide a new closed circuit-television (CCTV) monitoring system to be installed at the intersection with the traffic signals. The CCTV system 08/12/2025
C9
225 of 364
215
shall include, but not be limited to, a remote-control dome camera installed on one of the traffic signal poles; camera mount with transformer; a pole mount adapter; conduits and appropriate cabling from the signal pole to the traffic signal controller; fiber optic splicing in the nearest vault or pull box to connect the trunk fiber optic cable to the CCTV camera modem located in the traffic signal cabinet; all fiber optic splicing necessary inside the traffic signal cabinet; modems at the traffic signal cabinet and in the Civic Center; all fiber optic splicing necessary within the Civic Center premises; power wires; coaxial cables; all wiring, cabling, pigtails and connections necessary in the traffic signal cabinet and in the Civic Center; all necessary programming of equipment; and all other necessary ancillary equipment to make the system fully functional and operational.
The work and material quantities shown in the Plans and specifications are approximate only. It is the responsibility of the Contractor to coordinate with the manufacturer and to determine, provide, and install the actual amount of conduit, wiring, pull boxes, and all other necessary materials, and to determine and perform the actual amount of trenching, coring, and all other necessary work required to provide a complete and fully functional CCTV monitoring system at no additional cost to the Agency.
The Scope of this work includes all labor, materials, equipment, supplies, tools, fiber optic splicing (as described above), and installation in accordance with the manufacturer’s installation specifications, including all ancillary equipment and accessories as required for a complete and fully functional CCTV monitoring system, acceptable to the Engineer.
The Contractor shall provide cameras and other equipment, as shown on the Plans, as specified herein, and as described in the City of Vista Guidelines for the Preparation of Traffic Signal Design Plans, to maintain compatibility with other existing City installations. The remote- control dome camera, the modems, and all other ancillary equipment shall be warranted to be free of defects in material and workmanship for a minimum period of one (1) year from the date of shipment from the supplier’s facility. During the warranty period, the supplier shall repair with new or refurbished materials, or replace at no charge, any product containing a warranty.
Power cables shall be terminated in the controller cabinet. A separate circuit breaker independent of the other devices in the cabinet shall be provided. If there is an available 15A breaker in the cabinet for auxiliary devices, it may be used. Otherwise, provide a new circuit breaker in the cabinet at an accessible location.
At project close-out, the Contractor shall provide the Engineer with one (1) copy of complete manufacturer’s installation and maintenance instructions. Final Project close out will occur when the Engineer is fully satisfied with the work performed and all other incidental work required as part of this Contract to produce a complete and fully functional CCTV monitoring system.
701-17.8.2 Payment.
Add the following new subsection:
08/12/2025
C9
226 of 364
216
701-17.8.2 Payment. Payment for CCTV monitoring system shall be included in the Contract Unit Price or lump sum price in the Bid, and shall constitute full compensation for all materials, labor, equipment, tools, design engineering and shop drawing preparation, obtaining and installing Agency-supplied materials and equipment (if any), supplying and installing all other materials and equipment needed for a complete installation, providing temporary facilities to maintain operation of existing equipment, supplying and installing conduit and conductors, sawcutting, trenching, backfilling, finish grading, removals, disposals, supplying and installing pull boxes, relocating or adjusting pull boxes to grade, replacing any pull boxes that are disturbed by construction, fiber optic splicing and testing, all wiring and cabling, making connections to electrical services and communication systems, energizing and testing, and all other work and incidentals necessary to properly construct a complete and fully functional and operational CCTV monitoring system, as shown on the Plans and as described herein.
701-17.9 Payment.
Add the following new subsection:
701-17.9 Payment. Payment for electrical and Traffic Signal System(s) installations or modifications shall be at the Contract Unit Price or the lump sum price in the Bid and shall constitute full compensation for all materials, labor, equipment, tools, design engineering and shop drawing preparation, coordination with SDG&E, obtaining a City of Vista Electrical Permit, obtaining and installing Agency-supplied materials and equipment, supplying all other materials needed for a complete installation, salvaging existing traffic signal poles and equipment, saw- cutting, clearing and grubbing, earthwork, trenching and boring, foundation work, backfilling and fine grading, supplying and installing conduit and conductors, supplying and installing pull boxes, relocating or adjusting pull boxes and signal poles to grade, replacing any pull boxes that are disturbed by construction, splicing and testing, making connections to electrical services and communication systems, grouting bases of signal poles, providing new traffic detector loops, supplying and installing all other materials needed for a complete installation, energizing and testing, and all other work and incidentals necessary to properly construct a complete and fully functional electrical and traffic signal system, as shown on the Plans and as described herein and no additional compensation will be allowed. If no bid item is included, payment for the work shall be considered included in the related items of work, and no additional compensation will be allowed.
No payment shall be made for incidental repairs needed to improve surfaces or landscaping required for the construction and installation of these systems. Costs for any such efforts shall be included in the cost of related items themselves listed within the bid items.
Payment for Red-light Camera Conduit and Pullbox modifications shall be per lump sum bid, or as otherwise shown in the BID SCHEDULE, and shall constitute full compensation for all materials, labor, equipment, tools, obtaining City of Vista Electrical Permit, coordination with Redflex Traffic Systems, providing materials and equipment, trenching, supplying and installing conduit and pullboxes as shown on the Plans, and all other work and incidentals necessary to restore the Redflex Traffic Systems red-light camera system to full operation and no additional compensation will be allowed. If no bid item is included, payment for the work shall be 08/12/2025
C9
227 of 364
217
considered included in the related items of work, and no additional compensation will be allowed.
Payment for Replacing Red-light Camera and Traffic Signal Detector Loops shall be at the bid price per each loop replaced, or as otherwise shown in the BID SCHEDULE, and shall constitute full compensation for all materials, labor, equipment, tools, coordination with the Agency’s Traffic Engineering Division, providing all materials and equipment needed to restore the red-light camera and traffic signal detector systems to full operation including storm water pollution prevention, sawcutting, installing and connecting wires, troubleshooting, applying loop sealant as shown on the Plans and as described herein, and all other work and incidentals necessary to complete the work to restore the system to full operation, and no additional compensation will be allowed. If no bid item is included, payment for the work shall be considered included in the related items of work, and no additional compensation will be allowed.
701-18 TESTING.
701-18.1 General.
701-18.1.1 Fiber Optic Cable Testing – General.
Add the following new subsection:
701-18.1.1 Fiber Optic Cable Testing – General. Testing shall follow Caltrans procedure in fiber optic testing and the Contractor shall provide and complete the “Link Loss Budget Work Sheet.”
Testing shall include the tests on elements of the passive fiber optic components:
(1) at the factory,
(2) after delivery to the project site but prior to installation, (3) after installation but prior to connection to any other portion of the system, and (4) during the final system testing.
The active components shall be tested after installation. The Contractor shall provide all personnel, equipment, instrumentation and materials necessary to perform all testing. The Engineer shall be notified in writing a minimum of two (2) Working Days prior to all field tests.
The notification shall include the exact location of the system to be tested.
Documentation of all test results shall be provided to the Engineer for approval within two (2) Working Days after the test involved. The Contractors attention is directed to Record Drawings (“As-Builts”) elsewhere in these special provisions, regarding the requirements for recording test results.
Attenuation tests shall be performed with an OTDR capable of recording and displaying anomalies of point zero two (0.2) dB as a minimum. Single mode fibers (SM) shall be tested at 1310 nm and 1550 nm. The OTDR shall have a printer capable of producing a verifying test trace with fiber identification as shown in the “Link Loss Budget Work Sheet”, numerical loss values, the date and the operator’s name.
08/12/2025
C9
228 of 364
218
Prior to arrival of the cable, the Contractor shall provide detailed test procedures for all field testing to the Engineer. The procedures shall include the tests involved and how the tests are to be conducted. These test plans shall be subject to the approval of the Engineer.
701-18.1.2 Factory Testing.
Add the following new subsection:
701-18.1.2 Factory Testing. Verification of the fiber specifications as listed in the Fiber Characteristics Table shall be supplied by the Manufacturer with the appropriate documentation.
After cabling, before shipment but while on the shipping reel, one hundred percent (100%) of all fibers shall be tested for attenuation. Copies of the results shall be (1) maintained on file at the Contractor’s, Manufacturer’s and Owner’s place of business with a file identification number for a minimum of ten (10) years, (2) attached to the cable reel in a waterproof pouch, and (3) submitted to the Contractor and to the Engineer prior to the delivery of the cable to the jobsite.
701-18.1.3 Arrival on Site.
Add the following new subsection:
701-18.1.3 Arrival on Site. The cable and reel shall be physically inspected by the Contractor on delivery and one hundred percent (100%) of the fibers shall be tested with the OTDR for attenuation to confirm that the cable meets requirements. Test results shall be recorded, dated, compared and filed with the copy results shall be recorded, dated, compared and filed with the copy accompanying the shipping reel in a weather proof envelope. Attenuation deviations from the shipping records greater than five percent (5%) shall be brought to the attention of the Engineer in writing. The cable shall not be installed until completion of this test sequence and written approval by the Engineer is received. Copies of traces and test results shall be submitted to the Engineer. If the OTDR test results are unsatisfactory, the reel of fiber optic cable shall be considered unacceptable and all records corresponding to that reel of cable shall be marked accordingly. The unsatisfactory reels of cable shall be replaced with new reels of cable at the Contractor’s expense. The new reels of cable shall then be tested to demonstrate acceptability.
Copies of the test results shall be submitted to the Engineer for approval.
701-18.1.4 After Cable Installation Testing.
Add the following new subsection:
701-18.1.4 After Cable Installation Testing. After the fiber optic cable has been pulled but before breakout and termination, one hundred (100%) percent of all the fibers shall be tested with the OTDR for attenuation. Test results shall be recorded, dated, compared and filed with the previous copies of these tests. Copies of traces and test results shall be submitted to the Engineer for approval. If the OTDR test results are unsatisfactory, the fiber optic cable segment will be unacceptable. The unsatisfactory segment of cable shall be replaced with a new segment, 08/12/2025
C9
229 of 364
219
without additional splices, at the Contractor’s expense. The new segment of cable shall then be tested to demonstrate acceptability. Copies of the test results shall be submitted to the Engineer for approval.
701-18.1.5 Testing Outdoor Splices.
Add the following new subsection:
701-18.1.5 Testing Outdoor Splices. At the conclusion of all outdoor splices at one (1) location, and before they are enclosed and sealed, all splices shall be tested with the OTDR, in both directions. Splice segments shall be tested at 1310 nm and at 1550 nm. Individual fusion splice losses shall not exceed 0.2 dB. Measurement results shall be recorded, dated, validated by the OTDR trace printout and filed with the records of the respective cable runs. Copies of traces and test results shall be submitted to the Engineer. If the OTDR test results are unsatisfactory, the splice shall be unacceptable. The unsatisfactory splice shall be replaced at the Contractor’s expense. The new splice shall then be tested to demonstrate acceptability.
Copies of the test results shall be submitted to the Engineer for approval.
701-18.1.6 System Verification at Completion – OTDR Testing.
Add the following new subsection:
701-18.1.6 System Verification at Completion – OTDR Testing. Once the passive cabling system has been installed and is ready for activation, one hundred percent (100%) of the fiber links shall be tested with the OTDR for attenuation. Test results shall be recorded, dated, compared and filed with previous copies. Copies of traces and test results shall be submitted to the Engineer for approval. If the OTDR test results are unsatisfactory the link shall be replaced at the Contractor's expense. The new link shall then be tested to demonstrate acceptability.
Copies of the test results shall be submitted to the Engineer for approval.
701-18.1.7 Installed System Link Loss Budget.
Add the following new subsection:
701-18.1.7 Installed System Link Loss Budget. The Link Loss Budget Worksheet shall be completed for each communication point, as defined in the conductor schedules, using the data gathered throughout the installation process. The completed worksheets shall be included as part of the system documentation and in the Record Drawing (“As-Built”) Plans. Refer to Record Drawings ("As-Built”) Plans in this specification for additional requirements.
The total connector losses shall be calculated by the Contractor by summing the individual attenuation values for each connector pair in the path, excluding the transmitter and receiver connectors.
08/12/2025
C9
230 of 364
220
The total splice losses shall be calculated by the Contractor by summing the individual attenuation values for each splice in the link.
The total of other losses shall be calculated by summing the individual attenuation values for each component in the link not previously addressed. These items may include, but are not limited to, couplers, splitters, routers and switches.
The Total System Loss shall be recorded on the Link Loss Budget Worksheet.
701-18.1.8 Test Failures.
Add the following new subsection:
701-18.1.8 Test Failures. If during any of these system verification tests, the results prove to be unsatisfactory, the fiber optic cable and or defective splice enclosures will not be accepted.
The unsatisfactory components shall be replaced at the Contractor's expense. The new segment of cable shall undergo the same testing procedure to determine acceptability. Copies of the test results shall be submitted to the Engineer for approval. The removal and replacement of a segment of cable shall be interpreted as the removal and replacement of a single contiguous length of cable connecting two (2) splices, two (2) connectors, or a splice and a connector. The removal of only the small section containing the failure and therefore introducing new unplanned splices will not be allowed.
The Contractor shall perform fiber continuity and attenuation testing and fiber backscatter measurements at several stages in the system construction.
OTDR (optical time domain reflectometer) testing shall be done at the following points in the system construction:
At cable delivery (reel test)
Following cable installation prior to connectorization, termination or splicing. End to End following installation of all pigtails, connectors and termination devices
In addition, the final test (post-connectorization test) shall be completed with an optical power meter and light source.
All fibers shall be tested end to end. The end to end total attenuation shall not exceed the sum of the maximum allowable attenuation for the component cable segments, splices and typical loss for connectors. Nor shall the attenuation from an individual connector exceed the maximum allowable losses. If the fibers in the cable exceed the allowable loss, the Contractor shall take corrective measures to bring the cable’s total attenuation below the allowable limit, including replacement of the cable at the Contractor’s expense.
The Contractor shall perform all OTDR testing in the presence of the Engineer. The Engineer shall attach their written mark to all test documentation made by the Contractor at the time of the test. Testing performed by the Contractor and not witnessed by the Engineer shall not be accepted, re-testing will be required.
08/12/2025
C9
231 of 364
221
The Contractor shall verify that the attenuation and optical continuity of each active and spare optical fiber in the cable plant satisfies the specified requirements.
Attenuation and continuity shall be measured at the operational wavelength of the equipment being used on the link. If the operational wavelength is unknown, the attenuation shall be measured at both 1310nm and 1550nm.
Attenuation shall be calculated by the insertion method. Calibration between the light source and the power meter shall be performed at the beginning of each day of testing.
The Contractor shall record the attenuation of each optical link. Optical links shall be identified in the test results by identifying the label identifier on each drop cable and by identifying the field cabinet at which light was launched and at which it was received.
An acceptable OTDR shall be used to measure the backscattered light profile of the designated optical links. The OTDR shall include all necessary hardware to couple it to either a connectorized or non-connectorized fiber. While performing backscatter measurements, the end of the fiber link that is not connected to the OTDR shall be capped to prevent the ingress of infrared radiation. The OTDR used shall be provided with certification of its most recent calibration and shall not be more than twelve (12) months old.
A three thousand two hundred and eighty foot (3,280’) launch cable shall be inserted between the OTDR and the optical link to overcome the initial “dead zone” on the fiber trace.
The OTDR testing shall be done at a scale of at least one (1) dB per division on the vertical scale. It shall have a dynamic range of at least thirty (30) dB at 1,310 nm and distance measurement accuracy of plus or minus one-one hundredths of one percent (± 0.01%).
The Contractor shall record each optical link measured for attenuation by means of an electronic data file of the OTDR trace. The Contractor shall supply a licensed software package (installed on the Network Management Computer) to read, store, compare, and analyze the electronic data files created by the OTDR instrument. A hard copy printout of each trace shall also be provided, which shall include the measurements listed below. The OTDR traces shall be compared with this software following each testing stage of the installation. Documentation of this comparison shall be provided to the Engineer. Optical links shall be designated in the test results by indicating the label identifier on each drop cable and by identifying the field cabinet at which light was launched.
The OTDR traces shall be marked noting the physical location of each splice or connector.
The notation shall be clear and understandable.
The OTDR shall be of a manufacture recommended by the cable supplier. The OTDR operator shall hold a current operators certificate for the equipment used. This certificate shall represent not less than sixteen (16) hours of training from the equipment manufacture. This certificate shall be presented to the Engineer at the start of testing.
The test results shall include the following measurements:
08/12/2025
C9
232 of 364
222
total measured length of the optical link
total attenuation of the optical link
mean attenuation of each splice in the optical link under test wavelength of the measurement
Attenuation shall be measured in decibels.
The Contractor shall demonstrate that each fiber and splice satisfies the specified requirements.
Add the following new subsection:
701-18.1.9 System Testing and Documentation.
Description: The system testing and documentation shall cover pre-installation testing, subsystem testing, acceptance testing, physical inspection and functional testing. Performance testing, final acceptance and system documentation that is required to validate the operational performance of the system and described elsewhere in these special provisions.
Configuration: The contractor shall provide a technician to test and verify the operation of the Traffic Signal Interconnect System. The contractor shall show that all signals included in the project are properly connected and configured and can communicate with each other and with the existing BI Tran Systems/QuicNet 4 Advanced Traffic Management System installed on the Traffic Server at Vista City Hall at 200 Civic Center Drive. The technician shall ensure that local communication addresses are correctly set at each controller and that all modems are properly configured and transmitting data.
Test Plan: The Contractor shall develop and submit within thirty (30) Working Days to the Engineer an installation and test plan for approval, which details the method of installation and all testing for all material, equipment, and cable and the associated schedule of activities, based on these special provisions, plans, the manufacturer's recommended test procedures, and industry standard practices. Five (5) copies of the test plan shall be submitted to the Engineer for approval. The Engineer will review then approve or disapprove the plan within four (4) weeks. If the Engineer rejects the test plan the Contractor shall submit a revised test plan within ten (10) Working Days for review and approval by the Engineer. No testing shall be performed until Contractor's test plan has been approved by the Engineer. The tests shall quantitatively demonstrate that the design and production of material and equipment meet the requirements of these special provisions and plans. All test results, including results of failed test or re-tests, shall be submitted and delivered to the Engineer and a copy placed with the equipment at the site. All test equipment 08/12/2025
C9
233 of 364
223
shall be supplied by the Contractor. All testing shall be done in the presence of the project manager and signed off by the project manager.
The Contractor shall notify the Engineer of their intent to proceed with functional and subsystem testing forty-eight (48) hours prior to commencement of each test. Full environmental conditions shall be tested as part of the functional tests for field equipment. Subsystem testing and inspections shall include visual inspection for damaged or in correct installation, adjustments and alignment, and measurement of parameters and operating conditions.
Pre-Installation
Testing: Pre-inspection testing shall include testing of all material, equipment and cables in a laboratory environment prior to delivery to the site. Use of laboratory facilities, shall be arranged by the Contractor. The tests shall either be conducted at the equipment manufacturer's premises or at a laboratory arranged by the Contractor.
All material, except test equipment and special tools, shall be bench tested in accordance with the following paragraphs, which include those items described elsewhere requiring pre-installation testing for each individual item where applicable.
All active equipment shall be connected to normal operating power, energized and subjected to normal operating conditions for a continuous period of time in the laboratory of not less than forty-eight (48) hours.
Functional testing shall be performed by the manufacturer on all material prior to delivery to the site. The functional tests shall be performed in accordance with an approved test plan. Any material or equipment which fails to meet the requirements of the Contract shall be repaired or replaced and the test shall be repeated until satisfactory. All functional test results, including results of failed tests or re-tests, shall be submitted and delivered with all material and equipment delivered to the site.
Full performance tests shall be performed by the manufacturer or by the Contractor on not less than five percent (5%) or at least one unit of material selected at random from the normal production run. The full performance test shall be performed in accordance with a test plan developed by the Contractor and approved by the Engineer.
Subsystem
Testing: Subsystem testing shall encompass the testing of all material, equipment and cable after installation, but prior to acceptance tests.
These tests shall be done in accordance with the performance testing called out under each individual item in these special provisions.
08/12/2025
C9
234 of 364
224
Equipment and hardware shall be installed in accordance with the plans and special provisions. All material, equipment and cable shall be tested after installation at the site. Subsystem testing and inspections shall include visual inspection for damaged or incorrect installation, adjustments and alignment, and measurement of parameters and operating conditions. The Contractor shall notify the Engineer of their intent to proceed with subsystem testing forty-eight (48) hours prior to commencement of each test.
Installation documentation and test results shall be provided for all material, equipment and cable prior to commencement of acceptance tests. Installation documentation shall be in accordance with these special provisions and shall include the following as appropriate:
Model, part number and serial number for all material and equipment. Test equipment model number, serial number, settings, and date of last calibration. All strap and switch settings.
Record of all adjustments and levels.
Alignment measurements.
Identification of interconnections.
All factory, laboratory and site test results.
Acceptance
Testing: The acceptance testing shall be conducted in accordance with the approved test plan. The acceptance testing shall include conducting acceptance tests and subsequent re-tests, and documentation of the test results.
Final acceptance tests shall be conducted after the site and subsystem test results have been reviewed and accepted by the Engineer. These tests include the complete system in normal operations. The test plan shall address the full testing requirements of the specifications. The test plan shall detail all tests to be performed, the test results which are expected and the test schedule. The acceptance test plan shall include the following major test and acceptance categories:
Physical inspection
Functional tests
Performance tests
The Contractor shall test the communications system according to the approved acceptance test plan and shall provide all test equipment, labor and ancillary items required to perform the testing. The test equipment shall be certified to be calibrated to the manufacturer's specifications. The model and part numbers and date of last calibration of all test equipment shall be included with the test results.
08/12/2025
C9
235 of 364
225
Acceptance testing shall not commence until all material required by these special provisions and plans are delivered, installed, and aligned and all production test and site test documentation and results have been approved by the Engineer.
All acceptance test results shall be fully documented and such documentation provided as a condition of acceptance.
Physical
Inspection: The Contractor shall provide documentation to prove delivery of all material, equipment, cable and documentation. If any material or documentation is outstanding or have been replaced under pre-acceptance warranty a physical inspection and documentation shall be provided for this material. The physical inspection shall consist of inspecting all installed material to ensure workmanship satisfies the specified requirements.
Functional Tests: The Contractor shall test all system functions to demonstrate that all data circuits and all equipment satisfy the functional requirements of the specifications.
The connectivity of each data channel shall be demonstrated. The Contractor shall document all functional test results. In the event that any aspect of the functional tests are determined by the Engineer to have failed, the Contractor shall cease all acceptance testing and determine the cause of the failure and make repairs to the satisfaction of the Engineer. Acceptance testing shall, at the discretion of the Engineer, be repeated beginning from the start of functional tests.
Performance
Tests: The Contractor shall conduct operational performance tests on the following:
Response to alarm inputs
System diagnostics
If any circuit or element fails to satisfy the specified performance requirements the Contractor shall determine the cause and correct the failure to the satisfaction of the Engineer.
The full performance tests shall be repeated under operating conditions as determined by the Engineer.
System
Documentation: The Contractor shall submit a draft copy of all documentation for review and approval prior to production of documentation. The Engineer will review and approve or reject the draft documentation within four (4) weeks of receipt.
The Contractor shall modify the documentation if required and submit provisional documentation. The Engineer will approve or reject the provisional documentation within three 08/12/2025
C9
236 of 364
226
weeks of receipt. The Contractor shall arrange for re-submission in a timely manner to meet the schedule in the case that the documents are rejected.
Draft documentation shall be submitted eight weeks prior to the start of installation. The draft documentation shall show the general approach in preparing the final manuals.
Upon approval of the draft documentation provisional documentation shall be supplied three (3) weeks prior to the start of site testing. The provisional documentation shall be of the same format as the final manuals but with temporary insertion for items which cannot be finalized until the system is completed tested and accepted. Final documentation shall be submitted no later than four (4) weeks after completion of the acceptance tests and shall incorporate all comments made during the approval stages. The Contractor shall be responsible for all delay caused by non-compliance to the specified requirements.
Final documentation shall be approved prior to its production. Ten copies of all final documents shall be delivered. The copies shall be on eight and one-half inch by eleven inch (8.5” x 11”) paper and bound in three-ring hard-covered binders complete with dividers. Also the documentation shall be furnished electronically in “Word” format. System documentation shall be arranged in an operation and maintenance (O & M) manual format providing all the information necessary to operate, maintain and repair the equipment and cable to the lowest module or component level. The operation and maintenance manual shall as a minimum consist of the following sub-section as described below:
Master
Items Index: This shall be the first section of the O & M manual. The section shall describe the purpose of each manual and brief description to the directory of the manual. It shall also reference equipment manuals as required for additional and support material.
System
Description and
Technical Data: This section shall contain an overall description of the system and associated equipment and cables with illustrative block diagrams. This section shall identify all equipment and cables in the system stating the exact module and option number that are employed in the system.
Technical data specification and settings for every type of equipment or cable shall be provided. Any modification that has been done on the equipment shall be clearly described.
Theory of
Operation: The manual shall contain a functional description of each element of the system, explaining how each function is being achieved separately and how each element works together to form the complete system.
Software
Documentation: Proper documentation for all software shall be provided. The software documentation shall include a clear description of the system's functionalities and specifications. Description of each software module 08/12/2025
C9
237 of 364
227
and program shall be provided. The Contractor shall supply related programming and system user manuals, application and utilities software user manual and all associated proprietary software manuals.
Software listing of all custom programs shall also be provided, as well as a copy of any software source code.
Operations: The manual shall describe how to operate the system and each particular type of equipment and software. Equipment layout, layout of controls, displays, software operating procedures and all other information required to correctly operate the system and each functional unit shall be provided. Procedures shall also be provided for initial tune-up of the system and adjustment and checkout required to ensure that the system is functioning within the performance requirements. Warning of special procedures shall be given. The functions and setting of all parameters shall be explained.
Corrective
Maintenance: The manual shall include fault diagnostic and repair procedures to permit the location and correction of faults to the level of each replaceable module. Procedures shall include alignment and testing of the equipment following repair, the test equipment, tools, diagnostic software required and the test set up.
Preventative
Maintenance: The manual shall include procedures for preventative maintenance in order to maintain the performance parameters of the system, equipment and cables within the requirements of the specifications.
Parts List: The manual shall include a list of all replaceable parts with exact parts description and number and a directory of recommended suppliers with correspondence address, telephone and facsimile (FAX) numbers.
Test Results: This section shall include a copy of the results for all he tests that have been conducted for the contract.
System schematic drawings shall be provided to identify the type of equipment at each location and the function of all equipment. The drawings shall also show how the system is interconnected. A comprehensive list of cabling and wiring shall be provided to clearly identify the interconnection and labeling.
The Contractor shall cooperate and coordinate with Contractors performing related contracts, to the extent feasible, to facilitate overall system testing.
701-20 SALVAGE.
Replace the entire subsection with the following:
08/12/2025
C9
238 of 364
228
701-20 SALVAGE. The Contractor shall salvage the existing traffic signal pole(s) and other equipment (pedestals, electrical equipment, etc.) as shown on the Plans or specified by the Engineer to be salvaged, and remove foundations that will no longer be used. The Contractor shall deliver any salvaged equipment to the Agency’s storage yard at 2430 Lupine Hills Drive.
Any items not specified to be salvaged shall become the property of the Contractor and shall be removed from the Work site. Any salvage value shall be reflected in the Bid.
Care shall be exercised in removing equipment to be salvaged so that it will remain in the condition existing prior to its removal. To avoid any live wires remaining in service, the entire length of wire extending to traffic signal pole(s) being removed shall be disconnected at the power supply and removed from the site. Complete restoration of affected surface improvements shall be required.
PART 8 – LANDSCAPING AND IRRIGATION
SECTION 800 – MATERIALS
800-1 LANDSCAPE MATERIALS.
Modify this subsection to read as follows:
800-1 LANDSCAPE MATERIALS. All landscape materials shall conform to all applicable City of Vista Standard Specifications for landscaping (see list of Appendices in Table of Contents). If not otherwise specified in the City of Vista Standard Specifications for landscaping, landscape materials shall conform to the Greenbook, the San Diego Regional Supplement to the Greenbook, and these specifications.
800-1.1 Topsoil.
800-1.1.1 General.
Delete this subsection in its entirety and replace with the following:
All topsoil shall be Class “A” (“imported”), as specified herein.
800-1.2 Soil Fertilizing and Conditioning Materials.
800-1.2.5 Mulch.
Delete this subsection in its entirety and replace with the following:
All mulch shall be Type 1 (ground wood product) as specified herein.
800-1.5 Headers, Stakes, and Ties.
08/12/2025
C9
239 of 364
229
800-1.5.2 Headers and Stakes.
Replace the first paragraph in this subsection with the following:
Headers shall be two inch by four inch (2” x 4”) inch composite wood (similar to “Trex”) except that two one inch by four inch (1” x 6”) boards shall be supplied for laminations on turns and curves. Header stock shall be supplied in lengths of at least ten feet (10’). Stakes for headers shall be pointed one and one-half inch by eighteen inch (1-½” x 18”) long of one-quarter inch (¼”) thick steel and be set at three feet (3’) on center with stakes located within one foot (1’) of both ends of each header. Header joint splicing shall use four inch x six inch (4” x 6”) galvanized steel truss plates.
800-2 IRRIGATION SYSTEM MATERIALS.
Modify this subsection to read as follows:
800-2 IRRIGATION SYSTEM MATERIALS. All irrigation materials shall conform to all applicable City of Vista Standard Specifications for irrigation (see list of Appendices in Table of Contents). If not otherwise specified in the City of Vista Standard Specifications for irrigation, irrigation materials shall conform to the Greenbook, the San Diego Regional Supplement to the Greenbook, and these specifications.
800-3 ELECTRICAL MATERIALS.
800-3.1 General.
Add the following paragraph to this subsection:
All electrical materials used for irrigation shall conform to all applicable City of Vista Standard Specifications for electrical materials for irrigation. If not otherwise specified in the City of Vista Standard Specification for electrical irrigation systems, electrical materials used for irrigation shall conform to the Greenbook, the San Diego Regional Supplement to the Greenbook, and these specifications.
SECTION 801 – INSTALLATION
801-1 GENERAL.
Modify this subsection to read as follows:
801-1 GENERAL. The surface preparation, construction of irrigation system for landscape areas, and installation of plants required by the Plans shall conform to the City of Vista standard special provisions for landscaping and irrigation, Technical Provisions from these specifications shall take precedence over other specifications.
08/12/2025
C9
240 of 364
230
The Contractor shall replace / restore all existing landscaping, sod, topsoil, and irrigation disturbed during the course of construction activities. All replacement of sod shall be of the same type as existed and as approved by the Engineer.
All replacement and new installation of landscape and irrigation shall be of the same type, size, caliper, and spacing as existing and as approved by the Engineer. All areas disturbed by construction, not covered by sidewalk or paved materials shall be landscaped and irrigated in accordance with these Technical Provisions.
All new landscaping shall be planted on salvaged topsoil or new Class A imported topsoil for a depth of twelve inches (12”) as approved by the Engineer.
During surface clearing operations, the Contractor shall not cover or bury any plant growth or other objectionable materials on public or private property. If the Contractor cannot successfully separate the plant growth from the surface soil and advertently or inadvertently mixes organic or other objectionable materials with the soil, the soil so contaminated shall be removed from the site by the Contractor. All costs, if any, associated with removing the soil mixed with organic or other objectionable materials and importing soil to replace said contaminated soil shall be borne by the Contractor and no additional payment shall be made to the Contractor.
The Contractor shall coordinate the removal and reconnection of the existing irrigation system with the property owner. As soon as the improvements in the area where portions of the existing irrigation system had been removed are completed, the Contractor shall reconnect and adjust the irrigation heads so that irrigation may commence. Reconnection may entail replacement and reconfiguration of sprinkler heads for appropriate irrigation coverage. The Contractor shall sufficiently irrigate areas of existing landscaping that are not being irrigated by the compromised irrigation system during the shutdown period.
Any irrigation facilities removed or adjusted for the construction of the sidewalk or other work shall be replaced, relocated, or re-configured with similar materials approved by the Engineer, so that the irrigation system is fully functional and appropriate for the landscaping being irrigated.
***END OF SECTION***
08/12/2025
C9
241 of 364
231
Appendix A:
COV Engineering Construction Survey Request
Instructions and Form
08/12/2025
C9
242 of 364
08/12/2025
C9
243 of 364
08/12/2025
C9
244 of 364
232
Appendix B:
COV SW Management Permit & Reference
Information
08/12/2025
C9
245 of 364
08/12/2025
C9
246 of 364
08/12/2025
C9
247 of 364
08/12/2025
C9
248 of 364
08/12/2025
C9
249 of 364
08/12/2025
C9
250 of 364
08/12/2025
C9
251 of 364
233
Appendix C:
Potential Staging and Storage Area Exhibits
08/12/2025
C9
252 of 364
08/12/2025
C9
253 of 364
08/12/2025
C9
254 of 364
08/12/2025
C9
255 of 364
08/12/2025
C9
256 of 364
08/12/2025
C9
257 of 364
08/12/2025
C9
258 of 364
234
Appendix D:
Project Sign Example
08/12/2025
C9
259 of 364
08/12/2025
C9
260 of 364
235
Appendix E:
City of Vista Standard Drawings
08/12/2025
C9
261 of 364
08/12/2025
C9
262 of 364
08/12/2025
C9
263 of 364
08/12/2025
C9
264 of 364
08/12/2025
C9
265 of 364
08/12/2025
C9
266 of 364
08/12/2025
C9
267 of 364
08/12/2025
C9
268 of 364
08/12/2025
C9
269 of 364
Superior Asphalt Performance
USE ACE XP Polymer Fiber To:
Improve Crack Resistance
Improve Rut Resistance
Improve Strength
Gain
Reduced Crack Filling Cost
Reduced Pot Hole Filling Cost
Reduced Pavement Thickness (If Desired)
Reduced Overlay Cost
Achieve
Longer Lasting Pavement Performance
Reduced Maintenance Cost Over the Life of Pavement
A Happier Traveling Public
08/12/2025
C9
270 of 364
Superior Asphalt Performance
ACE XP Polymer Fiber™ is a true achievement in additive technology to enhance asphalt concrete performance.
ACE XP Polymer Fiber™ extends pavement service life by dramatically improving the dynamic modulus of the asphalt layer and increasing the asphalt's resistance to cracking and rutting (distresses that may cause premature failure). To create ACE XP Polymer Fiber™, high -strength man -made “ aromatic poly amide” or Aramid Fibers are bundled and coated with Sasobit® wax to create an asphalt concrete additive that is simple to mix with any WMA or HMA in through a drum and or batch asphalt operation. The 3-dimensional reinforcement throughout the asphalt layer increases the asphalt’s re sistance to cracking, rutting, and fatigue while providing improved ESAL (Equivalent Single Axel Load) capacity.
ACE XP Polymer Fiber™ is engineered for performance.
Aramid Fibers are used extensively in many industries an d applications including ballistic protection, heat & cut protection, automotive, ropes & cables, conveyor belts, etc. However, i t takes a special fiber to withstand the extreme production temperatures of asphalt concrete without changes occurring to the reinforcement properties of the fiber.
That is why ACE XP Polymer Fiber™ uses aramid fibers exclusively . Aramid is a unique man -made, high-strength polymer fiber boasting high tensile strengths over 400,000 psi (5 x steel), a superior stress/strain relat ionship, and decomposition temperatures of 932oF (well above asphalt mixing temperatures of 400oF). Both ¾” long and 1.5” long fiber lengths are available for superior long-term performance.
Material Property Measure
Material Para-Aramid Fiber
(50-52% by weight)
Form Filament Yarn
Tensile Strength > 2.758 (GPa)
Elongation at Break < 4.4 (%)
Modulus > 95 (GPa)
Specific Gravity 1.44-1.45 (g/cm3)
Decomposition
Temperature
> 800 (˚F)
Treatment Type Sasobit® Wax
(48-50% by weight)
Treatment Melting
Temperature
> 170 (˚F)
Length ¾” & 1.5” +/-0.05 (inch)
Appearance/Handling Free Flowing Coated Fiber
Bundles (visual)
Aramid Fiber
(2.1 ounces/ton)
Sasobit® Wax
(2.1 ounces/ton)
Aramid
PET & Cellulose
ACE Fiber Specifications Aramid Stress/Strain Curves
ACE XP Polymer Fiber™
(4.2 ounces/ton)
08/12/2025
C9
271 of 364
Superior Asphalt Performance
How does ACE XP Polymer FiberTM reinforce asphalt concrete?
As the standard dosage of ACE XP Polymer Fiber™ is mixed into WMA or HMA (4.2 ounces of ACE Fiber™ per ton of asphalt concrete), the Sasobit ® wax melts at approximately 170oF, releasing millions of Aramid Fibers uniformly throughout each ton of asphalt concrete. Aramid is a unique polymer fiber that has hair -like fibrils which root tenaciously in the liquid asphalt binder and bond to small granules and aggregates. Through the combination of high tensile strength, strength at low strain, and "fiber anchoring" ACE XP Polymer Fiber™ delivers reinforcement to asphalt concrete and enhances the strength and durability of the finished asphalt concrete mix.
ACE XP Polymer Fiber™ (Before & After)
Aramid Fibers have fibrils that anchor and bond
themselves within the liquid asphalt binder and
granules increasing the tensile strength of the mix.
ACE XP Polymer Fiber™ microscopic
photos after chemical extraction
Orcutt Garey Rd. – Santa Barbara, CA (2016)
08/12/2025
C9
272 of 364
Superior Asphalt Performance
Has ACE XP Polymer FiberTM been Lab tested?
Has ACE XP Polymer FiberTM been Field tested?
Lab Test Description ACE XP Results
Lab - TTI Overlay Tester
Thermal/Reflective Cracking
+140%
Lab - DC(T) Test
Low Temperature Fracture Energy
+21%
Lab - IDT Strength Test
Low Temperature Strength @ Critical Crack Temperature
(Ran both ¾” and 1 ½” ACE XP Lengths)
+8 to 17%
Lab - IDT Creep Compliance Test
Determine Low Temperature Critical Cracking Value
(Bottom PG Number)
-4.3o C
(-1 PG – Bottom Number)
Lab - Hamburg Rut Test
Determine Rut Resistance of Various Asphalt Mixes
(Top PG Number)
PG64-22 (w/ ACE) = PG70-22
(+1 PG – Top Number)
Lab - Hamburg Rut Test
Determine Rut Resistance of Various Asphalt Mixes
(Top PG Number)
PG70-22 (w/ ACE) = PG76-22
(+1 PG – Top Number)
Lab – Flow Number Test (FN)
Determine Rut Resistance of ODOT Level 3 mix vs Control (Ran both ¾” and 1 ½” ACE XP Lengths)
+37.5%
Lab – Flexibility Index Test (FI)
Determine Fatigue Cracking Resistance of ODOT Level 3 mix vs Control (Ran both ¾” and 1 ½” ACE XP Lengths)
+37%
Lab – IDEAL CT Cracking Test
Determine IDEAL CT Crack Index of TxDOT Dense Grade 64-22 vs Control – (1 ½” ACE XP Lengths)
+36%
Lab – IDEAL CT Cracking Test
Determine IDEAL CT Crack Index of TxDOT SuperPave 76-22 vs Control (1 ½” ACE XP Lengths)
+58%
Field Test Description ACE XP Results
Field – APLT (Automated Plate Load Test) Static Creep
Measure Plastic Deformation of In-Place Asphalt (Rut) vs Control +11 to 19%
Rebound Ratio over Control
Field – APLT (Automated Plate Load Test) Elastic Modulus Measure Elastic Modulus of In-Place Asphalt w/ ACE Fiber +150%
Field – APLT (Automated Plate Load Test)
SN Layer Coefficient, a1 Back Calculate SN Layer Coefficient, a1 using Measured Elastic Modulus
+40%
Field – APLT (Automated Plate Load Test)
ESAL Prediction Using AASHTO 93 Calculate Increase ESAL Capacity of In-Place Asphalt Reinforced w/ ACE XP Polymer Fiber
+100% or more
Depending of Depth of Asphalt
Field – APLT (Automated Plate Load Test)
Measure Plastic Deformation of In-Place Asphalt (Rut) vs Control at various simulated tire pressures ranging from 150 to 750psi
24% to 31%
Less Rutting Depth
Field – APLT (Automated Plate Load Test)
Measure Plastic Deformation of In-Place Asphalt (Rut) vs Control at constant load of 20,000 lbs. for 15 minutes
61%
Less Rutting Depth
08/12/2025
C9
273 of 364
Superior Asphalt Performance
Does ACE XP Polymer FiberTM Lab performance translate to Field performance?
During summer months when asphalt pavements get hot and "soften" it is easier for wheel loads to create ruts in the surface, but not when millions of Aramid Fibers are rooted in the asphalt because they provide resistance to the “flow” of the soft binder. Likewise, in winter months when asphalt pavements are cold, and the asphalt shrinks and expands, ACE XP Polymer Fiber™ provides added tensile strength to the asphalt and enhance s the pavement ’s resistance to thermal cracking as well as fatigue cracking that tends to happen during at higher temperatures.
ACE XP Polymer Fiber™ - 1st
Commercial Installation –
Burnside Road – Portland, OR
(June 2014)
Burnside Road is a heavily
traveled arterial roadway in
downtown Portland , Oregon.
The City chose this roadway for
their first ACE XP project due to
the poor condition of the existing
roadway at the time. Both
cracking and some rutting,
especially at the inter sections
was obvious. These photos were
taken in March of 2 017 after 3
winters by the City of Portland
and shared with Surface Tech.
Burnside Road – Portland, OR (2014) Burnside Road – Portland, OR (2014) Burnside Road – Portland, OR (2014) Burnside Road – Portland, OR (2014) 08/12/2025
C9
274 of 364
Superior Asphalt Performance
ACE XP Polymer Fiber™ -
Butler County, Ohio -
Westchester Rd. Overlay Test
Project
(Before & After)
Reflective cracks from extensive
thermal cracking in Control lane
propagated through the aspha lt
overlay less than 10 months
after the 1.5-inch overlay was
completed, but not through the
ACE XP Polymer Fiber™
Reinforced lane even a year
later. Rutting is also controlled.
Westchester Rd - 2016
Westchester Rd - 2015
ACE XP Polymer Fiber™ -
Sadieville, KY – LOVE’S Travel
Center (2015 - Before & After)
Building a pavement section that
can handle the po unding of the
daily Truck Traffic is very
appealing to LOVES. Beside the
cost of the building, asphalt
maintenance is the second largest
expense for each location over the
life of the Travel Center. Reducing
the cost of this maintenance and
the disruption caused by such
maintenance wa s instrumental
for LOVES to trust their
pavements to ACE XP Poly mer
Fiber.
Travel Center Entrance – November 2015
Travel Center Entrance – November 2015
Travel Center Entrance – April 2016
Travel Center Entrance – March 2018
08/12/2025
C9
275 of 364
Superior Asphalt Performance
Is ACE XP Polymer FiberTM reinforced asphalt concrete easy to pave with?
Absolutely! Once ACE XP Po lymer FiberTM is dispersed
throughout the asphalt mix, millions of light-weight aramid fibers go to work reinforcing the asphalt mix, but they do not cause any changes to the working characteristics of asphalt mix. ACE XP Polymer FiberTM reinforced asphalt concrete goes through the paver in the exact same way, it can be raked and shoveled the in the same way and can be compacted the same way using the same equipment. All laydown procedures are seamless, making adoption of the technology easy and cost effective. Add ACE XP Polymer FiberTM to overlays and new pavements alike.
How do I assure the right amount of ACE FiberTM gets added to my asphalt?
Although ACE XP Polymer Fiber TM is engineered with controlled amounts of Sasobit ® Wax in order to efficiently disperse the Aramid Fiber throughout the asphalt mix, Surface Tech recognizes the importance of proper dosage an d mixing of the ACE XP Polymer Fiber TM during production at the asphalt plant. ACE XP Polymer FiberTM is easily included into the asphalt mixing process at both batch and drum plant facilities. A simple-to-operate Line-Vac® Compressed Air Delivery System or the Automated Micro Doser MD3 + is used to transport the appropriate amount of ACE XP Polymer Fiber TM to either the mixing drum of a drum plant or the pug mill/weigh hopper of a batch plant.
Once ACE Fiber TM is fed into mixing drum, t he Sasobit ® wax becomes f ully soluble in the liquid asphalt binder and releases millions aramid fibers to be dispersed throughout the heated aggregate and Recycled Asphalt Pavement (RAP) prior to the injection of the liquid asphalt binder. The addition of a single dose (4.2 ounces per ton of asphalt) of ACE XP Polymer FiberTM does not change the asphalt volumes or require any change to the job mix formula (JMF).
Every ACE XP Polymer Fiber TM sale provides a robust QA/QC program to ensure th e right amount of ACE XP Polymer FiberTM makes its way into each ton of asphalt concrete for every project. Asphalt producers may choose from the following options to perform Certified ACE XP Polymer Fiber TM mixing at their plants:
Full Service – Provided by a Trained and Certified QA/QC Technicians Do-it-Yourself (DIY) – Self Perform after Training & Certification is Obtained
The Line-Vac® is used to
transport ACE Fiber™ to the RAP
Collar at a Drum Plant
The Micro Doser MD3+ delivers
ACE Fiber™ continuously to
either the Drum or Pug Mill
Both QA/QC Methods ensure
ACE Fiber™ is well dispersed
in the Asphalt Mix
08/12/2025
C9
276 of 364
Superior Asphalt Performance
ACE XP Polymer FiberTM Value Proposition Examples:
Adding ACE FiberTM to an asphalt concrete mix design, an engineer, owner or agency can expect the following Value- Added Results:
1. ADD tremendous amount of strength and durability at VERY LITTLE COST
2. ADD some strength and durability at NO COST
3. SAVE COSTS in-lieu of traditional methods (Polymer Modified Binder or Interlayers)
400 W. Broadway, Suite 400
San Diego, CA 92101
(619) 750-1851
www.surface-tech.com
Locally Distributed By:
Increase Durability of Overlay
In-lieu of Reflective Crack Interlayers
In Lieu of Polymer Modified Binder
Strengthen Light Duty Pavements
Optimize Heavy Duty Pavements
1.5" asphalt overlay with ACE
Service Life increase: >50%
Cost Increase: +/- $1.00 per SY
1.5" asphalt overlay with ACE
Service Life increase: >50%
Cost Savings: $1-10 per SY
1.5" asphalt overlay with ACE
Equal Service Life BUT Easier Lay Down
Cost Neutral: $0.00 per SY
3.0" light duty asphalt with ACE
ESAL increase: >160%
Cost Increase: +/- $2.00 per SY
5.0" heavy duty asphalt with ACE
(In-lieu of 6" w/o ACE)
ESAL increase: >40%
Cost Neutral: +/- $0.00 per SY
08/12/2025
C9
277 of 364
T / 1-877-454-8096
PacificGeoSource.com
Pacific GeoSource / Data Sheets & Install Guide / FORTA-FI®
FACT DATA SHEET & INSTALL GUIDE
FORTA-FI®
Fiber Reinforcement for Asphalt
FORTA-FI® asphalt fiber features millions of high -tensile strength fibers that are dispersed into each ton of asphalt mix during the plant production process. FORTA -FI is the simplest way to reinforce asphalt.
Benefits achieved include greater resistance to fatigue, reflective, and thermal cracking, rutting, and crack propagation. FORTA -FI reinforced asphalt mixes build stronger, more durable pavements, significantly reducing life-cycle costs of your roadway.
FORTA-FI Reinforced Asphalt /
FORTA-FI fiber blend is added directly to the asphalt
mix during production creating a three- dimensional
material reinforcement throughout the entire asphalt
layer. This reinforcement helps control thermal,
reflective, and fatigue cracking, as well as reduce
rutting and raveling.
FORTA-FI is a cost-effective way to improve the
durability and longevity of a variety of pavement
applications such as airports, streets, highways,
interstates, and industrial parking lots, etc.
Additionally, FORTA-FI can be used as a stabilizing
agent in SMA’s and OGFC’s.
FORTA-FI
Physical Properties /
Fiber Aramid Polyolefin
Specific Gravity 1.44 0.91
Density
2,427 lb/cu yd
(1,440 kg/cu m)
1,534 lb/cu yd
(910 kg/cu m)
Tensile Strength 400 ksi
(2,758 MPa)
N/A*
Operating
Temperature
-100 – 800°F
(-73 – 427°C)
N/A*
Length 0.75 in (19 mm) 0.75 in (19 mm)
Form Monofilament Serrated
Color Yellow Yellow
Acid Resistance Inert Inert
Alkali Resistance Inert Inert
* Fibers will melt or become plastically deformed during asphalt mix production.
Table 1.
Delivery, Storage, and Handling /
Deliver FORTA-FI fiber -reinforcement in sealed,
undamaged containers with labels intact and legible,
indicating material name and lot number. Deliver
fiber-reinforcement to plant location convenient to
where it will be introduced into the mixing process.
Material should be covered and stored off the
ground.
Do not allow boxes to become wet.
Features / ▪ High Tensile Strength Aramid Fibers
▪ Complete and Uniform Dispersion & Distribution
▪ Feeds Easily into Batch or Drum Plants
▪ Superior Technical Support and Guidance
Benefits / ▪ Stronger, More Durable Asphalt; Increased Service Life ▪ Fatigue, Reflective, and Thermal Cracking and Rutting Resistance ▪ No Change to Mix Design or Construction Process
▪ Easier Compaction
08/12/2025
C9
278 of 364
T / 1-877-454-8096
PacificGeoSource.com
Plant Introduction : Continuous Drum Plant /
FORTA-FI reinforcement fiber will be added at a rate
of one pound per ton of asphalt concrete.
A. For projects larger than 3,000 tons with daily
production quantities exceeding 1,000 tons per
day, it is recommended that fiber-reinforcement
be added using a fiber metering device (FMD).
The FMD will be supplied by Pacific GeoSource
and will be accompanied by an experienced
technician who will set up and run the machine
for the duration of the project. If an FMD is
purchased or leased, certified personnel from
Pacific GeoSource will provide fiber feeding
training and certification for plant personnel as
needed.
Figure 1: Voyager Portable Fiber Feeder.
1. The FMD requires a 240/480 volt electrical
hookup at the plant and should be installed and
tested prior to the start of asphalt production.
2. The FMD holds 300 pounds of fiber -
reinforcement in the storage hopper at one
time. Fiber should be loaded into the FMD in
bulk without any plastic bags. During
production, the hopper should be refilled prior
to reaching a minimum fiber quantity of 30
pounds.
3. The FMD is a weigh-in-motion drum and blower
system which utilizes highly sensitive load cells
to precisely meter and dispense the fiber. This
innovative fiber feeding system certifies the
feed rate matches the plant production rate
ensures a dosage rate of one pound per ton .
Fiber metering data is recorded and can be
downloaded from the device as required.
4. Fiber-reinforcement is fed from the FMD into
the drum via a flexible 4 -in clear hose through
the RAP port or other suitable entry point. The
fiber injection point should be after fines
collection and before the addition of liquid
asphalt, so that mixing may occur within the hot
aggregate prior to coming in contact with liquid
binder.
5. A minimum plant production temperat ure of
220°F is recommended.
B. For projects smaller than 3,000 tons, it is
recommended that fiber be fed manually via
one of two procedures.
One Pound Bags
1. Place individual one -pound bags onto the
recycled asphalt pavement (RAP) belt at a rate
matching the output of the plant in tons per
hour (TPH) per Equation 1.
Equation 1:
3600/Tons per Hour
For example, for an operation at 300 TPH, the
dosage rate is
3600/300 = 12 (place 1 bag every 12 seconds)
Figure 2: One pound bags on RAP belt.
2. Plastic bag will melt instantly when bag enters
drum and fibers will disperse into the mix. A
minimum plant production temperature of
275°F is recommended to fully mel t the plastic
bag.
3. Adding multiple one-pound bags at once is not
recommended.
08/12/2025
C9
279 of 364
T / 1-877-454-8096
PacificGeoSource.com
Little Shot Fiber Feeder
1. Provided by Pacific GeoSource on a short -term
lease, the Little Shot is a small portable unit
which requires an air compressor and a 4 -in
diameter hose to direct flow of loose fibers
through the RAP port.
Figure 3: Little Shot™ Fiber Feeder.
2. The Little Shot should be used when the
temperatures inside the drum at the RAP
entrance are insufficient to immediately melt
the plastic bag to release the fiber. Scenarios in
which this could occur include warm mix
processes where drum temperatures are less
than 315 °F or high and/or saturated RAP
contents.
3. Individual one -pound bags of FORTA -FI are
opened and feed into the Little Shot at a rate
matching the output of the plant (see part 1
above).
Plant Introduction : Batch Plant /
FORTA-FI reinforcement fiber will be added at a rate
of one pound per ton of asphalt concrete.
One Pound Bags
1. Add individual one -pound bags to the
aggregate in the weigh hopper . Plant
operations are typically unaffected, and
modifications are not needed. However,
depending on plant operations, slight
modifications to dry or wet mixing times may be
required.
2. One-pound bags are to be added to match
batch plant production. For example, for a
batch operation of 3 tons, three bags of FORTA-
FI would be required to meet the dosage of one
pound per ton.
3. The plastic bag will melt, and fibers will
disperse into the mix.
Figure 4: Manual Bag Feed at Batch Plant.
Big Shot Fiber Feeder
1. Provided by Pacific GeoSource by lease or
available for purchase, the Big Shot Fiber
Feeder unit requires an air compressor and 8 -
in PVC piping to direct flow of 1 -lb fiber bags
into the weigh hopper. Plant operations are
typically unaffected, and modifications are not
needed. However, depending on plant
operations, slight modifications to dry or wet
mixing times may be required.
2. The correct number of individual one -pound
bags of FORTA -FI are fed simultaneously into
the Big Shot based on batch size (see part 1.i.
above).
Quality Assurance /
Asphalt producer should visually inspect the mix
prior to sending trucks to the jobsite to ensure
proper blending of fiber into the asphalt has
occurred. Inspection should take place at the drum
discharge point and also in the back of the first
trucks to leave the plant. Verify fiber dispersion a
minimum of every two hours.
Observe mix for undispersed clips and aramid
bunches. Spot check asphalt mix in the truck and
while paving. Look carefully as binder -soaked clips
are difficult to see.
If unblended fibers are visible, minor adjustments to
mixing operations may be needed to correct. This
may be accomplished by adjusting the angle of the
loose fiber feed tube, raising production
08/12/2025
C9
280 of 364
T / 1-877-454-8096
PacificGeoSource.com
temperature (when high RAP% is used), or lowering
the TPH production rate, with the ultimate goal of
increasing the time for fibers to disperse in the hot
aggregate prior to injection of liquid binder.
Record fiber feeding data manually or using the FMD
automatic data logging system to provide
verification of fiber dosage as needed to comply
with project specifications.
Fiber supplier will provide technical assistance
during feeding operations and support during
construction as needed.
Packaging /
US Short Ton Metric Ton
Bags 1.0 lb 0.5 kg
Cartons 35 bags 35 bags
Bulk Carton 35 lb, loose in carton 16 kg, loose in carton Pallets 16 cartons/560 bags 12 cartons/210 bags
Gaylord Pallets 600 lb 273 kg
Table 2.
Limited Warranty /
Pacific GeoSource Products are warranted to be
free of defects in material and will meet all
published physical properties as set forth herein.
Except for the express limited warranty set forth
herein, neither Pacific GeoSource nor any person
on Pacific Geosource’s behalf has made or makes
any express or implied representation or warranty
whatsoever, either oral or written, including any
warranties of merchantability, fitness for a
particular purpose, title, or non-infringement,
whether arising by law, course of dealing, course
of performance, usage of trade or otherwise, all of
which are expressly disclaimed.
The exclusive remedy for defective product is
outlined in Pacific GeoSource’s Standard Terms
and Conditions of Sale, available upon
request. CONSEQUENTIAL DAMAGES ARE
SPECIFICALLY EXCLUDED.
Pacific GeoSource reserves the right to change the
features and specifications of its products without
prior notice. © 2020 Pacific GeoSource
08/12/2025
C9
281 of 364
236
Appendix F:
San Diego Regional Standard Drawings and
Caltrans Standard Plans
08/12/2025
C9
282 of 364
08/12/2025
C9
283 of 364
08/12/2025
C9
284 of 364
08/12/2025
C9
285 of 364
08/12/2025
C9
286 of 364
08/12/2025
C9
287 of 364
08/12/2025
C9
288 of 364
08/12/2025
C9
289 of 364
08/12/2025
C9
290 of 364
08/12/2025
C9
291 of 364
08/12/2025
C9
292 of 364
MONOLITHIC CURB IF SPECIFIED OR REQUIRED TRANSITION AREA .S, '
,� //
.· .· -· , .. · ·,.· .· .·· · .. · -· ( .· .· .·
..• : • .. -:-'-'.\: • .... :· ·:· .. : -< :·.. : __ .. _·: :_·.·_··. •.•·.· _:-_ ·.:··. _·._.//_.-: :_: • _:_:.;-:\.- _'.·.<-::·'<
.'·:
: . .-
·.
:.•:_.\:
:
.
-:.-
.
--:
·· >._1 __ .• ·. · .·:_ : ;_ .. ·
SIDEWALK
CURB
SEE TYPE B
-·�·
z 4'-o" z
l_A
PLAN-TYPE A
MONOLITHIC CURB IF
SPECIFIED OR REQUIRED
FACE OF CURB
FACE OF CURB
LIP OF GUTTER
4' MIN
4'-0" Z
l_A
R W
LIP (TOE) OF
GUTTER
PLAN-TYPE B
NOTES:
1. SEE STANDARD DRAWING G-32A FOR GENERAL NOTES.
4" THICK MIN
2. FOR TRUNCATED DOMES DETAILS, SEE STANDARD DRAWING G-30.
3. Z SIDE SLOPES SHALL BE 1: 10 OR 15' MAX.
4. LANDING CROSS SLOPE SHALL BE 2.0% MAX IN BOTH DIRECTIONS.
SECTION A-A
5% MAXIMUM GUTTER
APRON SLOPE AT
RAMP OPENING
SEE DETAIL B
STANDARD
DRAWING G-32A
5. *LANDING MAY BE REDUCED TO 3' MIN IF INFEASIBLE BUT Z SIDE SLOPES SHALL BE 1 :12 MAX OR 15' MAX.
Revision By Approved Date RECOMMENDED BY THE SAN DIEGO
SAN DIEGO REGIONAL STANDARD DRAWING REGIONAL STANDARDS COMMITTEE ORIGINAL BAHMANIAN 04 86
UPDATE K.EQUIPADO 12/22
CURB RAMP - TYPES A AND B
(NEW CONSTRUCTION) DRAWING
NUMBER G-27A
08/12/2025
C9
293 of 364
08/12/2025
C9
294 of 364
08/12/2025
C9
295 of 364
08/12/2025
C9
296 of 364
08/12/2025
C9
297 of 364
10/25/2018
08/12/2025
C9
298 of 364
08/12/2025
C9
299 of 364
08/12/2025
C9
300 of 364
08/12/2025
C9
301 of 364
237
Appendix G:
Appendix G COV Encroachment Permit
08/12/2025
C9
302 of 364
ENCROACHMENT PERMIT APPLICATION FORM
Please print required information
ENGINEERING DEPARTMENT
200 CIVIC CENTER DR.
VISTA, CA 92084
(760) 639-6111
JOB AND OR DRAWING NUMBER: ISSUED BY: DATE:
JOB SITE ADDRESS OR DESCRIPTION: PERMIT #: PERMIT EXPIRATION DATE:
48 HOUR NOTICE REQUIRED FOR
INSPECTION AND PRIOR TO START OF WORK
CALL (760) 639-6113
ASSESSOR'S PARCEL NUMBER (APN):
CONTRACTOR:
YOU MUST CALL UNDERGROUND SERVICE ALERT AT
(1-800-422-4133)
(2) WORKING DAYS PRIOR TO WORK
UNDERGROUND SERVICE ALERT NO.
THIS PERMIT IS INVALID WITHOUT THIS NUMBER
CONTRACTOR'S MAILING ADDRESS:
CITY ZIP
EMAIL ADDRESS:
A CASH SECURITY is required for trench excavation or any work not covered by construction bonds. CASH SECURITY shall be a minimum of $500 or equal to the cost of the proposed improvements within the City's right-of-way. CASH SECURITY may be returned as follows. For deposit amounts greater than $500, ninety percent (90%) of the CASH SECURITY may be returned upon completion and approval of the improvements by the City Engineer or his designee. The remaining ten percent (10%) or a minimum of $500 will be retained for a period of (1) year after the date that the work is completed. CASH SECURITY will be forfeited and used to correct defects, unacceptable work, trench failures or subsidence if corrective work is not completed within (5) working days after notification.
PHONE#: FAX#:
STATE LICENSE NUMBER BUSINESS LICENSE NUMBER
DESCRIPTION OF WORK:
JOB SITE CONTACT: I agree to save, keep and hold harmless the CITY OF VISTA, its office
rs and agents, from all damages, costs, or expenses in law or equity that may at any time arise or be set up because of damages to property, or of personal injury received by reason of or in the course of performing work, which may be caused by any willful or omission by the contractor, or any of the contractor's employees, or any sub-contractor. The CITY OF VISTA will not be liable for any accident, loss or damage to the work prior to its completion and acceptance.
CELL PHONE #
START
DATE
ESTIMATED
COMPLETION DATE
THE FOLLOWING MUST BE INCLUDED OR EMAILED
WITH PERMIT APPLICATION: I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability, for workman’s compensation or to undertake self-insurance in accordance with the provisions of said Labor Code and I will comply with such provisions before commencing the performance of the work of this contract.
TRAFFIC CONTROL PLANS (1 COPY)
SITE PLAN / VICINITY MAP (1 COPY)
CONSTRUCTION PLANS (1 COPY)
LIABILITY INSURANCE (1 COPY)
WORKMAN'S COMP INSURANCE (1 COPY)
CITY OF VISTA BUSINESS LICENSE (1 COPY)
I hereby acknowledge that I have read this application and certify that the
information given is correct. I agree to comply with all applicable city ordinances, state laws and with the requirements of this permit.
CALOSHA PERMIT (1 COPY)
PLEASE SEND EMAIL SUBMISSIONS TO THE
FOLLOWING
EMAIL ADDRESS:
[email protected]
SIGNATURE
PRINT NAME
DATE
NOTICE: THIS IS NOT AN ENCROACHMENT PERMIT - CONTRACTOR MUST SIGN ACTUAL PERMIT IN PERSON Version Date July 2023
08/12/2025
C9
303 of 364
CITY OF VISTA
Requirements for Encroachment Permits
1. Must have State Contractor’s License.
2. Required License Types: For trench ing, only A, C-34, C-36 & C42 allowed Additional License Types may be allowed for Surface Improvements
3. State of California Occupational Safety and Health Permit (CALOSHA).
4. Must submit applicable Underground Service Alert Number, if applicable.
5. Must have valid City of Vista Business License.
6. Must have Workers Compensation Insurance with the City of Vista as Certificate Holder.
7. Must have Liability Insurance with the City of Vista listed as the Certificate Holder and as Additional Insured.
If working in a street or easement, liability amount must be at least $1,000,000.00 For surface improvements - sidewalks or driveways amount must be $500,000.00
8. Must have $1,000,000.00 of pollution liability insurance if doing any work on or within public sewer manholes or public sewer mains.
9. Must adhere to the attached City Notices for Traffic Control, Materials, and Stormwater standards.
10. Permit Fee & Required Cash Trust Deposit: Minimum cost of permit is $1,669.85 plus a minimum cash trust deposit of $500.00 or an amount equal to the cost of the improvements being done within the City’s right-of-way. Minimum permit fee covers 3 hours of inspection time and 30 minutes for preconstruction meetings. Additional fees will be due if more than 3 hours of inspection time is required.
Trust Deposit may be returned as follows.
Ninety percent (90%) of Cash Deposit may be returned upon completion and approval of the improvements by the City Engineer or his designee.
The remaining ten percent (10%) or a minimum of $500.00 will be held for a period of one year after the completion and final approval of the work and may be returned if the funds are not required to correct improvement defects, unacceptable surface work and trench failure or subsidence which is not corrected within (5) working days after notification.
APPROVABLE TRAFFIC CONTROL PLANS MUST TO BE SUBMITTED WITH PERMIT APPLICATION. ISSUANCE OF PERMIT MAY BE DELAYED IF NOT SUBMITTED.
TRAFFIC CONTROL PLANS MUST MEET ALL REQUIREMENTS MANDATED WITHIN THE CALIFORNIA MANUAL ON TRAFFIC CONTROL DEVICES.
200 Civic Center Drive • Vista, CA 92084 • Ph 760-639-6111 • Fax 760-639-6112
PLEASE NOTE
Additional Insured Endorsements must be included
as attachments to the Certificate of Liability Insurance ***** Endorsements must cover Ongoing and Completed Operations ***** 08/12/2025
C9
304 of 364
CITY OF VISTA - Notice
The following General Traffic Control Conditions shall be considered a part of the City of Vista Encroachment Permit Traffic Control and Standards
1. Telephone Engineering Inspection at 760-639-6113, 48 hours prior to any work in the City right-of-way.
2. The traffic control plan must be prepared by either a California licensed Traffic Control Services Consultant (C31 Contractor’s License – Construction Zone Traffic Control Contractor) or be a California registered Traffic or Civil Engineer.
3. The traffic control plan must be in accordance with the latest edition of the California MUTCD or the San Diego Regional Standard Drawings.
4. The Encroachment Permit shall be kept on the worksite during all ongoing work with the City-approved traffic control plan.
5. Traffic control shall be set and maintained per the City approved traffic control plan. Barricades shall be Type II Flashing, with reflectorized delineators and signs, if required for night operations. Mi nimum lane width is 11 feet.
6. No street shall be closed without the approval of the Traffic Engineer pursuant to a City approved traffic control plan.
7. Pedestrian walkway shall be left open or detoured using a minimum four-foot- wide safe passageway pursuant to a City approved traffic control plan.
8. Normal working hours are 7:00 a.m. – 5:00 p.m., Monday through Friday unless indicated otherwise on the City approved traffic control plan.
9. Work in the public right-of-way shall be Monday through Friday only. No work is allowed on Saturday, Sunday, or City Holidays without prior City approval.
10. Upon permit expiration, all work ceases until a new permit application is submitted and approved. Existing permit time extension requests must be submitted prior to expiration date of permit.
11. No construction vehicles shall be parked upon public sidewalks. VCC
10.24.040.
12. It is the permittee’s responsibility to protect against any dirt or debris from being deposited within the City storm drain system. See attached stormwater pollution prevention requirements.
13. The permittee is required to immediately comply with all directives issued by the City Inspector to eliminate dust, mud, or other site nuisance. 200 Civic Center Drive * Vista, CA 92084 * 760-639-6111 * Fax 760-639-6112 08/12/2025
C9
305 of 364
CITY OF VISTA - Notice
The following Materials and Standards shall be considered a part of the City of Vista Encroachment Permit
Materials and Standards
1. The permittee is responsible to perform all work and conduct operations per City approved editions of the SSPWC, SDRSD, CITY STDS, CODES, this PERMIT, and all other applicable requirements.
2. No trenches shall be left open overnight. Trenches shall either be plated with recessed non-skid trench plates and all edges sealed with temporary AC seal, or backfilled and paved with a minimum of 2” of compacted 3/4" B2 PG 64-10 hot mix. Temporary AC Cold Mix is not allowed unless authorized by the City Engineer. For trenches wider than 4-feet, a paving machine is required.
3. Curb, gutter, sidewalk, driveways, and curb ramps shall be sawcut to an even line and be removed joint to joint per SDRSD G-11.
4. Curb and gutter and cross gutter shall be removed as directed by the City Inspector. Concrete removal will require a 1’ minimum section of asphalt sawcut and repave.
5. Permanent asphalt placement shall be per City of Vista Std. Dwg. SRF-08A & 08B. Two-inch (2") grind and cap is required for all trenches and shall extend a minimum of 4 feet wide or 12- inches from the outside edge of the trench whichever is greater. AC shall be placed using a spreader box or a paving machine. Cap with 1/2" Med. C2-PG 64-10 RAP unless otherwise noted. Streets paved with rubberized asphalt shall be capped with the same material.
6. All damaged roadway striping shall be replaced in kind.
7. All concrete placed shall be transit mix, unless waived by the City Inspector.
8. Two-sack slurry backfill is required when tunneling under curb and gutter.
9. All subgrade (12” depth) and basegrade material shall be compacted to 95 percent density.
Sidewalk sub/base material shall be compacted to 90 percent density. Certification, including compaction testing, shall be provided by the Permitee unless waived by the City Inspector.
10. No excavated material shall be hauled to a site within the City of Vista, without City Inspector knowledge of the end haul location, and the appropriate permits.
11. Any continuous hauling operation will require a City approved Haul Route Permit, prior to commencing the haul. Hauling of dirt/rock etc. without this permit may subject this haul to an immediate Stop Work Notice.
12. Approved City materials for construction include:
a. Asphalt: Surface course – ½” Med. C2-PG 64-10 RAP, Min. .10 thick Base course – ¾” Med. B-PG 64-10 RAP
Berm – D2-AR-8000
[Performance Grade (PG) asphalt binder may be substituted for AR-8000 asphalt binder in AC Berm]
b. Concrete for structures – 6-sack 3250 PSI min.
c. Concrete for curb and gutters, sidewalks, driveways – 520-C-2500 min. d. Base material for curb ramps – 6” Class II/Caltrans 26-1.02B e. Street base material – Class II
f. Sidewalk base material – 6” Class II
g. Curing compound on all concrete – Type I SSPWC 303-5.6 All standards are considered minimum and may be revised by the City depending upon field considerations, standards and materials approved on a signed City plan, supercede above materials and standards. It is the permittee’s responsibility to understand and implement all Standards, Codes and other applicable requirements. 200 Civic Center Drive * Vista, CA 92084 * 760-639-6111 * Fax 760-639-6112 08/12/2025
C9
306 of 364
CITY OF VISTA – NOTICE
The following Stormwater Pollution Prevention Requirements shall be considered part of the City of Vista Encroachment Permit Stormwater Pollution Prevention Requirements
Project Activity Required Pollution Prevention
Trash & Waste Generation
**REQUIRED FOR ALL
PROJECTS**
Permittee shall inform any on‐site employees of these pollution prevention requirements.
Within or adjacent to the encroachment area, permittee shall:
• Collect and contain all construction trash, waste, and debris • Promptly contain and clean any spill on site
• Routinely inspect site, remove loose trash, and prevent spills • Properly dispose of any hazar dous materials
• Not wash down surfaces unless water is collected and removed or directed to landscape
• Close lids in trash collection areas when not in use
Digging of Dirt – excavation,
trenching, demolition of
structures or grading
Within or adjacent to the encroachment area, permittee shall:
• Prevent dirt from migrating into street, sidewalk, or storm drain • Protect nearby storm drain inlets with perimeter controls and/or filter fabric • Install and maintain effective erosion and sediment controls • Cover exposed soils using mulc
h, tarps, or erosion control devices
• Secure tarps over dirt and debris piles
• Routinely sweep site to remove and properly dispose of dirt generated by work Driveway or Sidewalk Within or adjacent to the encroachment area, permittee shall:
• Direct surface runoff to landscape areas, where feasible • Follow Required Pollution Prevention Requirements for “Digging of Dirt” • Follow Required Pollution Prevention Requirements for “Concrete, Paint, Mortar, or Stucco Work”
Concrete, Paint, Mortar, or
Stucco Work
Within or adjacent to the encroachment area, permittee shall:
• Contain wet mixing areas within confined area
• Prevent concrete, paint, mortar or stucco material from migrating into street, sidewalk or storm drain
• Properly dispose of waste material generated by work
Temporary Storage of
Materials Outside
Within or adjacent to the encroachment area, permittee shall:
• Elevate work materials off ground where possible, such as on pallets • Secure tarps over work materials stored outside
Washing of Material,
Equipment, or Surface
Within or adjacent to the encroachment area, permittee shall:
• Not wash down surfaces unless water is collected and removed or directed to landscape
Landscaping and Irrigation
Systems
Within or adjacent to the encroachment area, permittee shall: Not store landscape materials in street
Prevent dirt from migrating into street, sidewalk, or storm drain Secure tarps over piles of mulch or soil
Routinely sweep site to remove and properly dispose of dirt generated by wo rk Not wash down surfaces unless water is collected and removed or directed to landscape
Test irrigation system, preventing overspray and runoff from hard surfaces 08/12/2025
C9
307 of 364
238
Appendix H:
Sample Public Notification Documents
08/12/2025
C9
308 of 364
NOTICE
2023 Pedestrian Mobility
Sidewalks Project
WORK WILL START IN MONTH YEAR AND CONTINUE UNTIL MONTH YEAR The City of Vista has retained _________________ of __________, CA to construct sidewalk and curb ramp improvements along W. California Ave from N. Santa Fe Ave to Calle Chapultepec.
The construction will require the implementation of traffic control to accommodate the work.
Curb ramps and pedestrian traffic in the areas described above will be temporarily affected.
Vehicle access through the work zone will also be temporarily affected but the streets will remain open to through traffic.
We will endeavor to complete this work as quickly as possible and with a minimum of inconvenience
to you. Thank you for your understanding and cooperation during the construction of this project.
If y
ou have any questions about the project or any concerns during construction, please contact one of the individuals below:
City Proj
ect Manager City Inspector Construction Contractor
Name Name Name
Engineering Department Engineering Department Company
(760) 643-____________ (760) 726-1340 x-____ Phone number [email protected] ------@cityof
vsita.com E-mail address
Sincerely,
Project Manager
Name
City of Vista, Engineering Department
08/12/2025
C9
309 of 364
NOTIFICACION
Movilidad Peatonal 2023
Proyecto de Banquetas
El trabajo comenzara MONTH YEAR y terminará MONTH YEAR
La ciudad de Vista ha contratado a ____________ de ____________, C A para la construcción de banquetas y entradas por las siguientes calles:
Woodrail Drive a Gannet Drive
La construcción requiere control de tráfico para poder trabajar. Las entradas y tráfico peatonal en las áreas mencionadas anteriormente serán temporalmente afectadas.
El acceso vehicular
en el área de construcción también será temporalmente afectado, pero las calles se mantendrán abiertas al tráfico.
Esperamos complet
ar este trabajo lo más pronto posible con mínimas molestias. Le agradecemos su comprensión y cooperación durante la construcción de este proyecto.
Si tiene alguna pregunta o preocupación durante la construcción, por favor c omuníquese con cual
quiera de las siguientes personas:
Gerente del P
royecto Inspector de la Ciudad Contratista de Construcción Name Name Name
Departamento de Ingeniería Departamento de Ingeniería Company (760) 643-____________ (760) 726-1340 x-____ Phone number [email protected] ------@city
ofvsita.com E-mail addres s
Atentament
e,
Gerente del P
royecto para la Ciudad, Name
Ciudad de Vista, Departamento de Ingeniería
08/12/2025
C9
310 of 364
City of Vista
Engineering Department
NOTICE
2022 Sidewalks
Project NO PARKING
7:
00 A.M. - 5:00 P.M.
SORRY FOR THE INCONVENIENCE
Your side of the street MUST BE CLEAR OF PARKED VEHICLES on:
so th
at our contractor can construct new sidewalk and driveways in your neighborhood.
Since p
arking on the street will be prohibited and your driveway will be replaced on this date, PARK YOUR CAR ON THE OPPOSITE SIDE OF THE STREET OR ON AN ADJACENT, NON-POSTED STREET before the time listed in this notice so that you will not be deprived of its use.
PARKED
CARS WILL BE TOWED
You
will NOT BE ALLOWED TO USE YOUR DRIVEWAY OR THE
SIDEWALK on your street until the concrete surface cures. Please obey all construction area signs.
Please do not
permit water to run down your driveway, across the
sidewalk or in the gutter during street work. This will help the concrete to cure. If your trash is scheduled for pick up on this date, please have it out by 6:00 a.m. Access to your house will be provided.
UNDER NOR
MAL WEATHER CONDITIONS your street should generally
be back in service by 5:00 p.m. However, the construction delays and unforeseen problems could a ffect the completion time. Work not done because of wet weather or unforeseen circumstances will be rescheduled and you will be re-notified within the next 2 weeks.
We rea
lize the inconvenience caused by limited access to your house.
Please understand that the inconvenience caused at this time is minor compared to the convenience of having sidewalk in your neighborhood.
THANK Y
OU FOR YOUR COOPERATION
City
of Vista, Engineering Department (760) 7639-6113
08/12/2025
C9
311 of 364
Ciudad de Vista
Departamento de Ingeniería
AVISO
Proyecto de mejoramiento de
banquetas para el año 2022
No habrá estacionamiento
De las 7:00am hasta las 5:00 pm
Sentimos
la molestia
Su lado de la calle debe estar libre de vehículos estacionados el día:
para que e
l contratista pueda construir nuevas banquetas y entradas de autos en su vecindario.
Ya que se pr
ohibirá el estacionamiento en la calle y su entrada temporalmente, estacione su coche en el lado opuesto de la calle o en una calle cercana antes del horario mencionado en este aviso para prevenir que su carro sea remolcado.
LOS CO
CHES ESTACIONADOS SERÁN REMOLCADOS
No se permi
tirá el uso de su entrada de carro hasta que se concluya la construcción de la banqueta. Por favor obedezca todas las indicaciones de la zona de construcción.
Por favor no permita que el agua corra por el camino de la entrada, sobre la banqueta, o en el canal durante la construcción de la calle. Esto ayudará que el concreto se seque. Si la colección de basura está programada para esa fecha, por favor asegúrese que los botes de su basura estén afuera a las 6:00am. Se proporcionará acceso a su casa para la colección de la basura.
Bajo c
ondiciones normales de clima, generalmente su calle debe ser accesible después de las 5:00pm. Sin embargo, problemas imprevistos y retrasos de construcción podrían afectar la fecha de terminación del proyecto. Si el trabajo se retrasa por lluvia o por circunstancias imprevistas, será reprogramado y se le notificará en un lapso de 2 semanas.
Estam
os conscientes de las molestias causadas por acceso limitado a su casa.
Por favor, comprenda que las molestias ocasionadas en este tiempo son temporales y menores en comparación con la comodidad de tener banquetas nuevas en su comunidad.
GRACI
AS POR SU COLABORACION
Ciud
ad de Vista, Departamento de Ingeniería, (760) 7639-6113 08/12/2025
C9
312 of 364
239
Appendix I:
City of Vista Traffic Signal Notes
08/12/2025
C9
313 of 364
GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS