I. FORWARD

These guidelines establish uniform procedures for the design of both new and modified traffic signals in the City of Vista. It is not intended as a textbook or as a substitute for established standards, experience in the principles of traffic signal design and sound engineering judgment, but rather as a guideline to uniformity and to provide the designer with sufficient information to prepare the desired plans with a minimum of uncertainty.

II. STANDARDS

Traffic signal design and installation in the City of Vista shall conform to the following:

1. City of Vista Development Code

2. City of Vista Standard Drawings

3. The latest edition of Caltrans Standard Plans

4. The latest edition of Caltrans Standard Specifications

5. The latest edition of Caltrans Standard Special Provisions

6. The latest edition of the California Manual on Uniform Traffic Control Devices (CA MUTCD)

7. The latest edition of the Caltrans Traffic Manual (only the parts which are still in effect)

8. The latest edition of the Standard Specifications for Public Works Construction (“Green Book”), including supplements thereto

9. The latest edition of the San Diego Regional Standard Drawings

10. Project Plans and Specifications

The Engineer of Work shall:

1. Be a Civil Engineer (not a Traffic Engineer) with current California registration and shall sign and seal the final Plans.

2. Meet with the City’s Project Engineer to review design concepts and shall prepare a “redlined” concept drawing for discussion.

3. Obtain an electrical service point (power source) using the applicable process for the serving utility.

4. Prior to beginning design, send a map of the area where the improvements are proposed to all utility companies so that the utility companies can provide as-builts of their utilities. Next, send to the utility companies draft design plans showing the proposed improvements along with the utilities plotted from the as-builts so that the 08/12/2025
C9
314 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 2 of 13 ends

utility companies can verify the location of their utilities and check for conflicts with the proposed improvements. If conflicts are foreseen, utility companies, at their discretion, shall pothole locations of potential conflicts prior to completion of the design plans.

Final approved design plans must also be sent to the utility companies for final verification of utility locations and conflict checks and for use in utility relocation, if needed.

5. Perform an as-built and record search to depict on the Plans all existing utilities (water, sewer, storm drain, electric, gas, traffic signal fiber optic, other communications infrastructure, etc.) within the entire footprint of the work area. Also show all existing utility poles and overhead wires as they may conflict with traffic signal poles and mast arms.

6. Verify that all existing traffic signal equipment and any proposed traffic improvements conform to current standards. Additionally, the Engineer of Work shall verify if the existing equipment can be re-used, replaced, salvaged and/or disposed of.

7. Submit electronic CAD and PDF drawings reflecting as-built changes as submitted by the contractor using bubbles and deltas. The Engineering Department will plot the as- built, obtain signatures and file the as-builts in the City’s system. Note that the original electronic CAD file must be saved separately prior to making any as-built changes.

III. DESIGN PLANS

Plans shall be designed on City standard “D” size sheet including the title sheet. The City’s standard title sheet with all notes will be provided by the City as detailed below. The quality of drafting and lettering size shall conform to the highest standards in order to ensure legible reduced prints. Plans shall be produced in the AutoCAD version currently used by the City's Engineering Department. All AutoCAD and other electronic files and an electronic copy of the signed plans in PDF format shall be submitted to the City.

DESIGN PLAN GUIDELINES

1. A traffic signal design plan shall contain the following elements:
• Standard improvement plan title sheet with notes. The standard title sheet with all the notes will be provided by the City as detailed in Section IV below. • Standard traffic signal design title sheet with Traffic Signal Notes and applicable Construction Notes. The standard title sheet with all the notes will be provided by the City as detailed in Section IV below.
• If applicable, standard interconnect title sheet with General Notes, Traffic Signal Interconnect Notes, applicable Construction Notes and details. The standard title sheet with all the notes and details will be provided by the City as detailed below. • If applicable, standard title sheet with signage and striping notes and details. The standard title sheet with all the notes and details will be provided by the City as detailed in Section IV below.
• Plan view drawing showing traffic signal improvements. • Conductor schedule, pole schedule, phase diagram and detector assignment tables.
• Design sheets showing other improvements as necessary. 08/12/2025
C9
315 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 3 of 13 ends

• Construction and post construction BMPs and erosion control design. Sample BMP details and notes are available for review and electronic dissemination by the City.

2. The above design sheets can be rearranged to reduce the total number of sheets as space allows. For example, the Traffic Signal Notes may be placed on the standard improvement plan title sheet and the applicable Construction Notes may appear on the traffic signal design sheet itself. Another example is to combine the Traffic Signal Notes and the signage and striping notes and details into one sheet.

3. A traffic signal design plan shall use NEMA phasing conforming to the California Manual on Uniform Traffic Control Devices (CA MUCTD), Part 4, Highway Traffic Signals.

4. The traffic movements on the major roadway shall be designated phases 2 and 6.

Phase 2 is to be used to designate either the northbound or eastbound movement. If the two intersecting streets are apparently of equal importance, the City's Engineering Department shall designate which of the two is the major roadway.

5. North shall always be oriented up or to the right on all design plan sheets. The major roadway shall always be horizontal on the plan.

6. Signal design plans shall be drawn at a 1" = 20' scale.

7. Pole identification numbering (or lettering) shall always increase clockwise around the intersection with the lowest numbered pole being always on the corner where the controller cabinet exists or is to be located.

8. Conduit run identification numbering shall start at the farthest conduit crossover from the controller cabinet corner and always increase in clockwise direction toward the home run pull box on the controller cabinet corner. The final home run conduits shall have the highest identification numbers.

9. Traffic signal poles and foundations shall be shown to their actual scale and placed on the Plans in the exact location where they are to be installed.

IV. TITLE SHEET AND PLAN NOTES

CITY CIP PROJECTS DESIGN PLAN NOTES

For City Capital Improvement Program (CIP) projects, obtain the needed standard title sheets (include the border, signature boxes and all pertinent notes and details) from the Engineering Department.

PRIVATE DEVELOPMENT PROJECTS DESIGN PLAN NOTES

For private development projects, obtain the needed standard title sheets (including the border, signature boxes and all pertinent notes and details) from the City’s website at:

www.cityofvista.com

08/12/2025
C9
316 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 4 of 13 ends

Once on the City’s website, go to Departments → Engineering → Online Resources → AutoCAD Templates

TRAFFIC SIGNALS NOTES

The following notes appear on the traffic signal design standard title sheet. Please read these notes prior to beginning design.

1. Contractor shall coordinate electrical service details and scheduling with San Diego Gas and Electric well in advance of need.

2. Contractor shall prepare a traffic control plan and obtain the signed approval of the plan from the City Engineer or his representative for all work impacting vehicular, bicycle and pedestrian traffic and for any traffic signal shutdown. The plan is to be prepared by a California licensed construction zone traffic control contractor (C31 Contractor) or a California registered Traffic or Civil Engineer. The plan will depict all signing, striping, delineation, flagging and all other traffic control devices necessary to the operation, in the opinion of the City Traffic Engineer or his representative.

Actual working hours for construction and for traffic signal shutdowns will be determined by the City Traffic Engineer or his representative upon review of the traffic control plan and based on the impact to traffic. For City CIP projects, the Project Specifications provide more details regarding traffic control requirements and working hours for the specific project.

3. Traffic signal shutdowns must be approved by a traffic control plan in advance.

Contractor shall notify the City of Vista Public Works Department and the City Traffic Engineer or his representative, through the City Construction Inspector, a minimum of two (2) working days before implementing any traffic signal system shutdown already authorized by an approved traffic control plan.

4. Contractor shall notify the City Traffic Engineer or his representative, through the City Construction Inspector, a minimum of ten (10) working days prior to activation of new or modified traffic signals and shall arrange for a field meeting to perform the activation. The City Traffic Engineer or his representative will prepare a new or a modified timing sheet as appropriate and will provide the timing sheet to the contractor during the activation field meeting. Activations shall be accomplished within a two-hour period on weekdays between the hours of 9:00 AM and 2:00 PM upon approval from the Traffic Engineering Division.

5. Contractor shall arrange to have a signal technician employed by the controller manufacturer or his representative and qualified to work on the controller be present at the project site for the entire duration of the activation field meeting. The signal technician will input the timing provided by the City into the controller. The signal technician will also verify operability of the various components of the traffic signal and observe the operation of the traffic signal timing to ensure it operates properly.

6. The Contractor shall arrange to have technicians employed by the manufacturers of other components of the traffic signal equipment and qualified to work on the specific components be present at the project site if the Contractor determines that his 08/12/2025
C9
317 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 5 of 13 ends

personnel does not have the technical expertise to install, program, configure or activate the specific components.

7. In addition to the City Construction Inspector, the City will have a traffic signal technician on contract to the City present at new signal and signal modification activations. The technician will inspect the various components and wiring of the traffic signal cabinet battery back up cabinet and other traffic signal components such as traffic signal indications, pedestrian push button assemblies, pedestrian indications and other components. The technician is authorized, in the presence of the City Construction Inspector, to request changes and corrections be made by the Contractor during the traffic signal activation. If changes and corrections are not made during the activation, the technician will forward his recommendations to the City Traffic Engineer to require the Contractor to make the changes and corrections.

8. Contractor shall maintain in operation all existing traffic signals and street lighting for the benefit of the public during the progress of the work. Existing electrical services, traffic signal equipment, traffic signs, and street lights that are being replaced or relocated shall remain in service until the replacement facilities are installed and operational or useable.

9. Conduits between adjoining pull boxes shall be 2-inch HDPE unless otherwise noted on the Plans. Conduits crossing streets shall be a minimum of 3 inches in size.

10. All trenching for conduit installation must be accomplished using underground boring methods unless specifically allowed by the Engineer and noted on the Plans.

11. Underground signal conductors shall not be spliced.

12. All pull boxes shall be No. 5 unless otherwise noted on the Plans.

13. Pull boxes shall not be located in or within 1’ of any part of any curb ramp (sloped portions of the ramp; wings; grooves; or landings).

14. All pull box and vault covers shall be marked with the words TRAFFIC SIGNAL.

15. Contractor shall verify with the City Construction Inspector and City Traffic Engineer the precise field locations of all traffic signal equipment prior to installation.

16. An “AS-BUILT” drawing clearly showing the actual locations of all traffic signal components and other improvements shall be submitted by the contractor and approved by the City Traffic Engineer prior to the acceptance of the improvements.

17. All equipment and parts called out on the Plans to be salvaged must be delivered to the City’s Public Works Satellite Yard located at 2430 Lupine Hills Drive. However, the contractor must first contact one of the following Public Works staff members at least two working days in advance to coordinate delivery of the salvaged equipment and parts:

K
eith Gardner…….760-518-4738
JD Rubidoux……….760-644-6797

08/12/2025
C9
318 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 6 of 13 ends

TRAFFIC SIGNAL INTERCONNECT NOTES

The following notes appear on the standard traffic signal interconnect design title sheet.

Please read these notes prior to beginning design.

1. Conduit runs are shown on the Plans in schematic form only.

2. Contractor shall verify linear feet of conduit and fiber optic cable by field inspection.

3. Distances shown on the Plans are approximate. Contractor shall carefully measure actual distances and make allowances for slack before cutting fiber optic cable.

4. All trenching for conduit installation must be accomplished using underground boring methods unless specifically noted on the Plans.

5. Conduits must be installed within three feet of the face of curb or, if no curb exists, within two feet of the edge of pavement, except as necessary to avoid conflicts.

6. If open trenching is allowed for certain segments, then trench paving must be performed in accordance with City of Vista Standard Drawing Numbers SRF-8A & 8B, Type B.

7. Fiber optic cable shall be installed in 3” HDPE conduit.

8. All conduit bends are to be factory made.

9. Pull boxes shall be No. 6E unless otherwise noted on the Plans, spaced no more than 500’ apart and shall not be closer than three feet to driveways.

10. Pull box locations between intersections shown on the Plans are approximate and may be field located by the Contractor with the approval of the City Construction Inspector to avoid obstructions and facilitate construction.

11. Pull boxes shall not be located in or within 1’ of any part of any curb ramp (sloped portions of the ramp; wings; grooves; or landings).

12. All pull box and vault covers shall be marked with the words SIGNAL COMMUNICATIONS or SIGNAL COMMS.

13. It is the responsibility of the Contractor to determine the exact location, count and configuration of all loop detectors prior to commencing work in the area. The contractor is responsible for avoiding all loop detectors during construction and shall not cut or break any loops. Any damage to existing loop detection during construction shall be the responsibility of the contractor to replace. Boring under loop detector lead-in cable is allowed provided that a minimum 5’ distance be observed on each side of the loop, and operations do not result in pavement sag or loop damage.

14. Contractor shall replace, at Contractor’s expense, any fiber optic cable in which the attenuation of any single mode strand at 1310 nm exceeds 0.4 dB/Km, excluding single point events at authorized splices and connectors.

08/12/2025
C9
319 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 7 of 13 ends

15. When three or more fiber optic cables enter an enclosure, each fiber optic cable shall be labeled indicating the location of the far end of the fiber optic cable.

16. Deflection limits of all single mode fiber optic cable shall not exceed 20 times the outside diameter of the fiber optic cable being installed.

17. Concrete sidewalks near controller cabinets that are in conflict with proposed conduit routing and impracticable to bore or tunnel under shall be removed and replaced between expansion joints (whole panels), and not saw cut through slab. Removal and replacement of concrete shall include complete panels.

18. A spandrel section of an existing cross gutter that is in conflict with proposed conduit routing and is impracticable to bore or tunnel under shall be removed and replaced between expansion joints (whole panels), and not saw cut through the slab. Removal and replacement of concrete shall include complete spandrel sections from joint to joint.

19. An “AS-BUILT” drawing clearly showing the actual locations of all system components and other improvements shall be submitted by the Contractor and approved by the City Engineer prior to the acceptance of the improvements.

20. All equipment and parts called out on the Plans to be salvaged must be delivered to the City’s Public Works Satellite Yard located at 2430 Lupine Hills Drive. However, the contractor must first contact one of the following Public Works staff members at least two working days in advance to coordinate delivery of the salvaged equipment and parts:

K
eith Gardner…….760-518-4738
JD Rubidoux……….760-644-6797

08/12/2025
C9
320 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 8 of 13 ends

CONSTRUCTION NOTES

The following sample construction notes shall be used on traffic signal design Plans and traffic signal interconnect design Plans as applicable. Please note that these notes are general and only cover the most common installations in traffic signal and interconnect design. The notes may be modified and other notes may be added as appropriate. In addition, a note need not be shown on the plans if the item is not being installed.

1. Furnish and install:

A. McCain, Inc. model 352i ATC anodized aluminum cabinet with Corbin#2 locks.

Cabinet shall be equipped with a 16-channel output assembly and a 48-channel input assembly.

B. Foundation per Caltrans Standard Plan Drawing ES-3C.

C. Q-Free model 2070LX ATC traffic signal controller.

D. Latest version of Intelight MAXTIME signal timing software.

E. Model 412C system memory module.

F. EDI model 222 two-channel loop detectors.

G. PDA2 assembly Model 242 DC Isolator units.

H. Latest Tomar Optical Signal Processor.

I. McCain, Inc. 24VDC Model 206 power supply.

J. Model 210ECL conflict monitor.

K. All necessary load switches.

2. Furnish and install electrical service as follows:

A. Anodized aluminum cabinet enclosure per Caltrans Standard Plan Drawing ES-2C.

B. Type III-BF City approved traffic signal and lighting service (Address XXXX XXXXX) per SDG&E requirements, SDG&E Electric Underground Meter & Service Location Form available in the Project Specifications Appendix and per Caltrans Standard Plan Drawing ES-2E.

C. Metered 100A-2 Pole, 240V main circuit breaker.

D. Metered 50A-1 Pole 120V traffic signal circuit breaker E. Metered 30A-1 Pole, 240V lighting circuit breaker.

F. Obtain an electrical permit from the City’s Building Department prior to beginning this work.

G. Contact the City after completing this work for an electrical inspection and approval.

FOR PRIVATE DEVELOPMENT PROJECTS,
USE THIS NOTE 2 INSTEAD:

Furnish and install electric meter service as follows:

A. Anodized aluminum cabinet enclosure per Caltrans Standard Plan Drawing ES-2C.

B. Type III-BF City approved traffic signal and lighting service (Address XXXX XXXXX) per SDG&E requirements, SDG&E Electric Underground Meter & Service Location Form (to be obtained by Engineer of Work or Contractor) and per Caltrans Standard Plan Drawing ES-2E.

C. Metered 100A-2 Pole, 240V main circuit breaker.

D. Metered 50A-1 Pole 120V traffic signal circuit breaker E. Metered 30A-1 Pole, 240V lighting circuit breaker.

F. Obtain an electrical permit from the City’s Building Department prior to beginning this work.
08/12/2025
C9
321 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 9 of 13 ends

G. Contact the City after completing this work for an electrical inspection and approval.

3. Furnish and install a three-inch (3”) DB electrical service conduit and pull rope from the SDG&E service point (power source) to the electric meter service per SDG&E requirements and as shown on the SDG&E Electrical Underground Meter & Service Location form.

4. Furnish and install loops for vehicle and bicycle detection per City of Vista Standard Drawing TRF-5; Caltrans Standard Plans; Caltrans Standard Specifications; the Green Book; and the California MUTCD.

5. Furnish and install video detection as follows:

A. Iteris RZ-4 Advanced WDR (or City approved equal) camera and equipment necessary for video detection of vehicles and bicycles.

B. Location of cameras shall be determined in the field by the City Traffic Engineer and City Construction Inspector. Camera locations shown on these plans are to illustrate design intent only and are subject to adjustment due to field conditions or equipment requirements.

C. Latest Iteris Vantage Edge 2 processor card for each camera.

D. Latest Vantage Edge processor card.

E. Samsung LCD (or City approved equal) control display (Cyberview BNC+S-Video video input) in a lockable rack-mount drawer.

F. Computer mouse.

G. Provide all cables and accessories and make all connections and programming necessary for full and proper operation of the video detection system.

6. Furnish and install a complete Alpha battery backup system including:

A. Alpha FXM 1100 HP UPS/SNMP uninterruptible power supply (UPS) module.

B. Four Alpha cell 240 XTV batteries.

C. Alpha SE48-1616 cabinet with:
- Generator option.
- Corbin lock.
- Universal Automatic Transfer Switch (UATS).
- Universal Generator Transfer Switch (UGTS).
- Battery Cable Kit (BCK).
- Door light (LMP)
- Dead battery indicator light (LRI).
- 8” riser.

D. AlphaGuard battery charge management system model AG-CMT-4SC-P.

7. Furnish and install the latest Tomar (or City approved equal) emergency vehicle pre- emption (EVP) detector assembly, including mounting hardware and cables, for each direction. EVP shall be mounted per detail “B” of Caltrans Standard Plan ES-4E.

8. Furnish and install a mast arm-mounted reflectorized street name sign per City of Vista Standard Drawing Numbers TRF-3A through TRF-3E.

9. Furnish and install the latest Polara iNavigator model INS Accessible Pedestrian Signal 08/12/2025
C9
322 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 10 of 13 ends

(APS) system (or City approved equal), complete with push button stations (PBS) as follows:

A. 2-wire system.

B. 9” X 12” R10-3 CA MUTCD sign.

C. No countdown sign.

D. Standard audible message per item ‘H’ below.

E. Yellow color.

F. iCCU-S2 Shelf Mount Control Unit.

G. All equipment must be ordered per the Polara iNS/iDS Push Button Station Configuration/Order Form.

H. All stations must be programmed with custom Voice on Location (VOL) messages per the Polara Custom Voice Message Details Form.

I. Both forms are included in the Appendix of the Project Specifications.

FOR PRIVATE DEVELOPMENT PROJECTS, USE THIS NOTE 9 INSTEAD:

Furnish and install the latest Polara iNavigator model INS-2 Accessible Pedestrian Signal (APS) system (or City approved equal), complete with push button stations (PBS) as follows:

A. 2-wire system.

B. 9” X 12” R10-3 CA MUTCD sign with braille.

C. No countdown sign.

D. Braille for street names on push buttons, if available.

E. Standard audible message per item ‘H’ below.

F. Yellow color.

G. iCCU-S2 Shelf Mount Control Unit.

H. All equipment must be ordered per the Polara iNS/iDS Push Button Station Configuration/Order Form.

I. All stations must be programmed with custom Voice on Location (VOL) messages per the Polara Custom Voice Message Details Form.

J. Both forms must be completed by Contractor (or developer’s design engineer) and submitted to the City Construction Inspector as a material submittal.

10. Furnish and install the latest model of GE Lumination (or City approved equal) countdown pedestrian signal indications.

11. Furnish and install the latest model of 12” GE Lumination (or City approved equal) red, yellow and green signal indications.

12. Furnish and install LED safety lighting system, catalog number STR-LWY-3M-HT-05-E- UL-SV-700-R-UTL per appendix of Project Specifications, or City approved equal.

FOR PRIVATE DEVELOPMENT PROJECTS,
USE THIS NOTE 12 INSTEAD:

Furnish and install LED safety lighting system, catalog number STR-LWY-3M-HT-05-E- UL-SV-700-R-UTL, or City approved equal.

08/12/2025
C9
323 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 11 of 13 ends

13. Furnish and install a new 44” X 32” X 36” splice vault for fiber optic cable per Detail ‘A’ on sheet XX. Contractor shall provide the following:

A. A 12” base layer of clean crushed 1” rock sump topped with a 3/4” hardware cloth.

B. Two grounding rods.

C. Lifting rings and bolts.

D. The metal vault cover shall be 24” X 36” with 1” diameter pick holes.

E. The vault cover shall be marked with the words SIGNAL COMMUNICATIONS.

F. All metal surfaces shall have a galvanized finish.

14. Furnish and install a No. 6E pull box (with extension) with 45 degree bends for fiber optic cable per Detail ‘B’ on sheet XX. No.6E pull boxes shall be spaced no more than 500 feet apart.

15. Furnish and install 3” HDPE, wall type conduit for fiber optic cable to a minimum depth of 30”. All conduit bends shall be factory made. Furnish and install a new THWN coated No. 8 AWG tracer wire and a pull rope or tape inside the conduit. Example of a tracer wire is Advantage Digital Cable (ADC) XHHW-2 power cable, green in color.

16. Furnish and install a new trunk Corning Altos, all-dielectric, fully water-blocked, loose tube, gel-free, with FastAccess technology, XX-strand single mode fiber optic (SMFO) cable (or City approved equal). Contractor shall coil 50 feet of trunk 12- strand SMFO cable slack in every pull box or vault per Detail ‘C’ on sheet XX unless noted otherwise on the Plans. All fiber optic cable, including branch cables, shall be installed in its own conduit separate from electrical conductors.

17. Furnish and install a new branch Corning Altos, all-dielectric, fully water-blocked, loose tube, gel-free, with FastAccess technology, 6-strand single mode fiber optic (SMFO) cable (or City approved equal).

18. Furnish and install a new Corning splice enclosure, models SCF-4C-18-01 or SCF-6C- 22-01 (or City approved equal) per Detail ‘D’ on sheet XX. Splice enclosure shall be the latest Corning model or City approved equal. It shall have a minimum 72-fiber splice capability; provide cable ports as required; have a moisture-tight sealing arrangement; and have re-entry capability.

19. Perform necessary splicing of the 12-strand trunk fiber cable with the 6-strand fiber cable per Detail ‘E’ on sheet XX and splice details on Project Plans. All remaining unused fiber strands in the trunk cable must remain intact and if cut, must be rejoined by splicing.

20. Furnish and install a Dymec Layer 2 managed Ethernet switch, Model KY-3170EMx (or City approved equal) with the following information:

A. 8 X 10/100/1000Base-T(X) RJ-45 ports.

B. 2 X 100/1000Base(X) SFP Slots.

C. Power 9 ~ 36 Volts DC – for NEMA / Non NEMA cabinets.

D. PoE+ Upgradeable (external power).

E. Install switch in the traffic signal cabinet and connect cables per Detail ‘F’ on sheet XX of the Project Plans.
08/12/2025
C9
324 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 12 of 13 ends

F. Provide all cables; connectors; and auxiliary equipment necessary to establish communication to all network capable devices at the intersection and within the signal cabinet.

21. Furnish and install SFPs at each Ethernet switch. Contractor shall perform span calculations to determine the quantity and specifications for the SFPs. The general specifications are as follow:

A. Dymec, Cisco or City approved equal.

B. Temperature hardened.

C. With diagnostics.

D. LC connector.

E. Dual fiber.

22. Furnish new Corning closet connector housing (or City approved equal) as follows:

A. Corning Cassette Part Number CCH-CF.

B. Corning Panel, LC Adapters Part Number CCH-CP12-A9.

C. Corning Connector Housing Part Number CCH-01U.

D. LC single mode fiber pigtails.

23. Furnish and install a serial to Ethernet converter SNMP/HTTP adapter for the battery back up system. Provide necessary cables and connect the battery back up system to the Layer 2 switch. The adapter shall be compatible with the battery back up system.

24. Furnish and install a MOXA INJ-24A-T POE injector.

25. In the signal cabinet and at the Civic Center, splice fiber per splice details on the Project Plans. Contractor shall provide and install all necessary equipment at the traffic signal and at the Civic Center to establish full communications between the traffic signal and the Civic Center. This includes, but is not limited to, connectors; fiber optic pig tails; connector panels; patch panels; cords; etc.

26. Furnish and install an Encom E-Lite 58 INT (or City approved equal) single wireless ethernet radio on existing street light pole per Detail ‘I’ or Detail ‘J’ on sheet XX of the Project Plans with the following specifications and instructions:

A. 5.8 GHz.

B. 300 Mbps.

C. With integrated dual polarity panel antenna.

D. See network schematic on sheet XX of the Project Plans for radio connectivity.

27. Furnish and install an Encom E-Lite 58 INT (or City approved equal) dual wireless ethernet radio on existing street light pole per Detail ‘K’ on sheet XX of the Project Plans with the following specifications and instructions:

A. Maintain a minimum of 3-foor separation between the radio antenna.

B. 5.8 GHz.

C. 300 Mbps.

D. With integrated dual polarity panel antenna.

E. With two external Type-N female connectors.

F. Furnish and install Fisher Pierce FP-288 AC to DC adapter on existing street light pole per Detail ‘K’ on sheet XX of the Project Plans.
08/12/2025
C9
325 of 364

GUIDELINES FOR THE PREPARATION OF TRAFFIC SIGNAL DESIGN PLANS

Page 13 of 13 ends

G. See network schematic on sheet XX of the Project Plans for radio connectivity.

28. Furnish and install an Axis, HDTV, PTZ, remote-control camera, model Q6075-E (or City approved equal) to be mounted on top of the traffic signal pole on the XXXXXX corner of the intersection, with the following specifications and instructions:

A. HD TV .

B. 1080P.

C. Built-in analytics.

D. Provide and install mounts and brackets (Axis T91L61 or City approved equal).

E. Provide a CAT6 cable and connect the camera to the traffic signal cabinet.

F. The camera installation is to include all other necessary modems, cabling and programming to make the camera operational.

G. The camera installation shall also include all trenching; conduit; cabling; ancillary equipment; and splicing between the nearest splice vault or pull box and the traffic signal cabinet.

29. Contractor shall adjust conduit, pull boxes and cabinet locations to clear existing utility facilities except with regards to minimum conduit depth.

30. Furnish and install sign as noted on plans on traffic signal mast arm per Caltrans Standard Plan ES-7N Detail “U”.

31. Furnish and install sign as noted on plans on signal pole using saddle bracket per Caltrans Standard Plan RS4.
08/12/2025
C9
326 of 364
08/12/2025
C9
327 of 364
08/12/2025
C9
328 of 364
08/12/2025
C9
329 of 364
08/12/2025
C9
330 of 364
08/12/2025
C9
331 of 364
08/12/2025
C9
332 of 364
08/12/2025
C9
333 of 364
08/12/2025
C9
334 of 364
08/12/2025
C9
335 of 364
08/12/2025
C9
336 of 364
08/12/2025
C9
337 of 364
08/12/2025
C9
338 of 364
08/12/2025
C9
339 of 364
08/12/2025
C9
340 of 364
08/12/2025
C9
341 of 364
08/12/2025
C9
342 of 364
08/12/2025
C9
343 of 364
08/12/2025
C9
344 of 364
08/12/2025
C9
345 of 364
08/12/2025
C9
346 of 364
08/12/2025
C9
347 of 364
08/12/2025
C9
348 of 364
08/12/2025
C9
349 of 364
08/12/2025
C9
350 of 364
08/12/2025
C9
351 of 364
08/12/2025
C9
352 of 364
08/12/2025
C9
353 of 364
08/12/2025
C9
354 of 364
08/12/2025
C9
355 of 364
08/12/2025
C9
356 of 364
08/12/2025
C9
357 of 364
08/12/2025
C9
358 of 364
08/12/2025
C9
359 of 364
08/12/2025
C9
360 of 364
08/12/2025
C9
361 of 364
08/12/2025
C9
362 of 364
08/12/2025
C9
363 of 364
Line
Item Description Quantity
Unit of
Measure Unit Cost Total
1 Mobilization, Demobilization, bonds & insurance. (5% maximum of Total Base Bid) 1 LS $26,173.95 $26,173.95 2 Project Information Sign 2 EA $1,350.00 $2,700.00
3 Public Notification per Supplementary General Provisions, Section 7-12.2 1 LS $2,750.00 $2,750.00 4 Storm Water Pollution Prevention and Erosion Control 1 LS $6,300.00 $6,300.00 5 Traffic Control and Construction Staging for all work 1 LS $65,326.05 $65,326.05 6 Utility Potholing and Coordination 1 LS $15,500.00 $15,500.00 7 Unforeseen Field Conditions (stipulated amount) 1 LS $25,000.00 $25,000.00 8 Record Drawing (“As-Built”) Plans (stipulated amount) 1 LS $2,000.00 $2,000.00 9 Cold Milling (Variable depth) 7518 SF $3.00 $22,554.00 10 Remove and dispose of existing AC Dike (Berm) 120 LF $24.00 $2,880.00 11 Remove and dispose of existing AC pavement, Assumes 3" of AC 2987 SF $3.25 $9,707.75 12 Adjust VID Water Valve Cover to Finish Grade (stipulated amount) 9 EA $150.00 $1,350.00 13 Unclassified excavation and fill (includes export) 1 LS $15,000.00 $15,000.00 14 Asphalt concrete pavement includes cold milling areas and curb and gutter pavement restoration areas (Use 160 lbs/cf for estimating quantities) 237 TN $180.00 $42,660.00 15 Class 2 Aggregate Base for Cedar Road Roadway Section. (95% Compaction) 21 CY $185.00 $3,885.00 16 Type A AC Dike per SDRSD G-05 72 LF $70.00 $5,040.00 17 6" curb per SDRSD No. G-1 with 6" of aggregate base 81 LF $55.00 $4,455.00 18 6” Type ‘G’ curb and gutter per SDRSD No. G-2 with 6" of aggregate base 404 LF $55.00 $22,220.00 19 PCC Sidewalk per SDRSD No. G-7 with 6" of aggregate base 1805 SF $14.00 $25,270.00 20 Type A PCC curb ramp per SDRSD No. G-27A with dark grey truncated domes with 6" of aggregate base 2 EA $6,250.00 $12,500.00
21 Type C PCC curb ramp per SDRSD No. G-29 with dark grey truncated domes with 6" of aggregate base 1 EA $6,250.00 $6,250.00
22 PCC Driveway Entrance per SDRSD G-14A with 6" of aggregate base 1 EA $6,500.00 $6,500.00 23 Geogrid Fabric for Poor Soil Conditions 300 SF $12.50 $3,750.00 24 4" Type 1 Mulch 7 CY $450.00 $3,150.00
25 Final Signing and Striping (includes striping & sign removals and relocations) 1 LS $14,000.00 $14,000.00 26 Cold Milling (2" depth) 1122 SF $5.25 $5,890.50
27 Remove and dispose of existing AC pavement (assumes 4 inches) 1886 SF $4.50 $8,487.00 28 Remove and dispose of existing PCC sidewalk, curb and gutte r 1326 SF $8.00 $10,608.00
29 Adjust VID Water Valve Cover to Finish Grade (stipulated amount) 3 EA $150.00 $450.00 30 Adjust City of Vista sewer manhole to Finish Grade 1 EA $3,000.00 $3,000.00 31 Unclassified excavation and fill (includes export) 1 LS $15,000.00 $15,000.00 32 Asphalt concrete pavement includes cold milling areas and curb and gutter pavement restoration areas (Use 160 lbs/cf for estimating quantities) 27 TN $255.00 $6,885.00 33 6” Type ‘G’ curb and gutter per SDRSD No. G-2 with 6” aggregate base 314 LF $55.00 $17,270.00 34 PCC Sidewalk per SDRSD No. G-7 with 6” aggregate base 1771 SF $14.25 $25,236.75 35 Type A PCC curb ramp per SDRSD No. G-27 with dark grey Truncated Domes per SDRSD No. G-30 with 6" of aggregate base 2 EA $6,350.00 $12,700.00 36 4" Type 1 Mulch 13 CY $310.00 $4,030.00
37 Final Signing and Striping (includes striping & sign removals and relocations) 1 LS $17,000.00 $17,000.00 38 Traffic Signal Modifications (includes installations for detection loops, pedestrian push buttons, poles and signal heads) 1 LS $50,000.00 $50,000.00 Total $523,479.00