Documents are in place and have been initially tested, and are operationally functional, subject only to final testing, balancing and adjustments and normal Final Completion punch list Work.
16.2 Final Completion shall be deemed to occur on the last of the following events: (1) recordation of a Notice of Completion for the Project; (2) acceptance of the Project by the City; 3) issuance of a final Certificate of Occupancy for the Project; (4) submission of all documents required to be supplied by DB to City under this Agreement, including but not limited to As-Built Drawings, warranties, and operating manuals; (5) and delivery to City of a Certificate of Completion duly verified by DB.
16.3 DB shall provide City with a Certificate of Completion, certifying to City under penalty of perjury that the Project has been completed in accordance with the Construction Documents, all applicable building codes and regulations, all permits, licenses, and certificates of inspection, use and occupancy, and ordinances relating to the Project.
16.4 DB shall provide one set of City final record drawing documents at the end of construction and one copy in electronic format (“As-Built Drawings”). As-Built Drawings are to be accurate and legible records showing exact location by dimensions, and the exact depth by elevation of underground lines, valves, plugged tees, wiring and utilities.
16.5 DB shall provide a copy of, or make available before destruction, all records (which includes all writings as defined in Evidence Code Section 250) to the City upon receipt or generation, which shall include a copy of DB’s filing protocol.
Section 17: Contract Time
17.1 The “Contract Time” shall be the number of calendar days stated in Section 1 for DB to achieve Substantial Completion.
17.2 “Time is of the essence” with regard to Contract Time and all milestones listed in the schedule.
17.3 The Contract Time may only be changed by a Change Order as set forth in Section 14.
17.4 Further, an extension in Contract Time will not be granted unless DB can demonstrate through an analysis of the Project Schedule that the increases in the time to perform or complete the Project, or specified part of the Project, beyond the corresponding Contract Time arise from unforeseeable causes beyond the control and without the fault or negligence of DB, its Design Consultants, and subcontractors or suppliers, and that such causes in fact lead to performance or completion of the Project, or specified part in question, beyond the corresponding Contract Time, despite DB’s reasonable and diligent actions to guard against those effects.
17.5 DB carries the burden of proving an entitlement to an increase in the Contract Time.
Delays attributable to and within the control of Design Support Consultants, or subcontractor or supplier shall be deemed to be delays within the control of DB. No time extension will be allowed for such delays. An increase in Contract Time does not necessarily mean that DB is due an increase in the GMP.
Section 18: Late Completion
18.1 City and DB recognize that time is of the essence in this Agreement and that City will suffer financial loss if the Project is not completed within the Contract Time, plus any extensions thereof allowed in accordance with Section 17.3. They also recognize the delays, expense, and 11/10/2026 C6 141 of 357
00105692 1
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363)
difficulties involved in proving in a legal proceeding the actual loss suffered by City if the Project is not completed on time. Accordingly, instead of requiring any such proof, City and DB agree that DB shall pay as liquidated damages (but not as a penalty) for each calendar day of delay beyond the time specified for Substantial Completion of the Project, the following amounts which DB expressly agrees are “not unreasonable under the circumstances” as defined in California Civil Code §1671(b): $4000 for each calendar day. Liquidated Damages shall not be assessed after the date on which Substantial Completion is achieved pursuant to Section 16.
Section 19: Right to Modify Work
19.1 Without invalidating the Agreement and without notice to any surety, City may at any time or from time to time, order additions, deletions, or revisions in the Project; these will be authorized by a written Change Order prepared and issued by City. Upon receipt of any such document, DB shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Construction Documents (except as otherwise specifically provided).
19.2 When City desires a change in the Project, City may issue a Request for Proposal to DB.
DB will be required to respond within the time indicated by City.
Section 20: INTENTIONALLY LEFT BLANK.
Section 21: Work By Others
21.1 City may perform other work related to the Project at the Project Site by City’s own forces, or let other direct contracts (“City Contractor”). The City will give DB reasonable notice of its intent to do such other work. DB’s work shall take priority over the City Contractors; but the Parties will use their best efforts to coordinate their work so as to minimize the disruption to each other’s work and to allow City Contractor to proceed expeditiously.
21.2 If the proper execution or results of any part of DB’s work depends upon the work by the City or City Contractor, DB shall promptly inspect and report to City in writing any apparent delays, defects, or deficiencies in the City’s work that render it unavailable or unsuitable for such proper execution and results. DB’s failure to promptly report such delays, defects, or deficiencies in writing before commencement of the affected work, will constitute an acceptance of the City’s work as fit and timely for integration with DB’s Work except for latent defects and deficiencies in the City’s work for which DB will not be responsible.
21.3 If DB or any person or entity working for DB causes damage to the City’s or City Contractor’s work, property, or person, or if any claim arising out of DB’s performance of the Project by any other contractor is made against DB, by City, any other contractor, or any other person, DB shall promptly repair and/or resolve said claim at no cost to City.
Section 22: Warranties and Guarantees
22.1 DB warrants and guarantees to City that materials and equipment incorporated into the Project will be new unless otherwise specified and that all work will be in strict accordance with the Construction Documents and will not be defective. Prompt notice of defects known to City shall be given to DB. All Defective Work, whether or not in place, may be rejected, corrected, or accepted as reasonably directed by City, provided DB shall not be entitled to an extension in Contract Time or increase in GMP because of any delay or increase in cost attributable to the rejection, correction or acceptance of said work. Defective work may be rejected even if approved by prior inspection.
11/10/2026 C6 142 of 357
00105692 1
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363)
22.2 The warranty period shall commence when the Certificate of Final Completion is issued or at beneficial use by City prior to Final Completion, whichever occurs earlier, and extend one 1) year after that date or whatever longer period may be prescribed by laws or regulations or by the terms of any applicable special guarantee or specific provision of the Construction Documents.
22.3 INTENTIONALLY LEFT BLANK.
22.4 INTENTIONALLY LEFT BLANK.
22.5 Correction of Defective Work - If within the designated warranty period, or such longer period as may be required by laws or regulations, the Project or any part of the Project, is discovered to contain defective work, DB shall promptly, without any reimbursement or adjustment in the GMP, and in accordance with City’s written instructions, either correct that defective work, or if it has been rejected by City remove it from the Project and replace it with work which is not defective. If circumstances warrant it, including but not limited to, in an emergency, City or DB may have the defective work corrected or the defective work removed and replaced. In that event, DB shall not be allowed to recover any associated costs, and DB shall reimburse City for all direct, and indirect costs of City, and City shall be entitled to an appropriate decrease in the GMP, to withhold a setoff against amount recommended for payment, or make a claim on DB’s bond if DB has been paid in full.
22.6 With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for Work performed and materials furnished under this Agreement, the DB shall:
22.6.1 Obtain all warranties that would be given in normal commercial practice and as required by the City;
22.6.2 Require all warranties to be executed, in writing, for the benefit of City;
22.6.3 Enforce all warranties for the benefit of City, if directed by City;
22.6.4 In the event DB’s warranty under Section 22.2 has expired, City may bring suit at its expense to enforce a subcontractor’s, manufacturer’s, or supplier’s warranty;
22.6.5 DB shall assign all subcontractor, supplier and manufacturer warranties including maintenance contracts from the installer for specialized equipment to cover the limited warranty period to City at the expiration of the one year warranty.
Section 23: Use and Possession Prior to Completion
23.1 City shall have the right to take possession of or use any completed or partially completed part of the Work if mutually agreed upon by the parties. Before taking possession of or using any Work, City shall furnish DB a list of items of Work remaining to be performed or corrected on those portions of the Work that City intends to take possession of or use. However, failure of City to list any item of Work shall not relieve DB of responsibility for complying with the terms of this Agreement. City’s possession or use shall not be deemed an acceptance of any Work under this Agreement, nor relieve the DB of any of its obligations under this Agreement.
23.2 While City has such possession or use, DB shall be relieved of the responsibility for the loss of or damage to the Work resulting from City’s possession or use. If prior possession or use 11/10/2026 C6 143 of 357
00105692 1
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363)
by City delays the progress of the Work or causes additional expense to DB, an equitable adjustment shall be made in the GMP or the Contract Time, and the Agreement shall be modified in writing accordingly.
Section 24: Personal Services and Non-Assignability
24.1 This is a personal services Agreement and, therefore, DB shall not alter the key employees or Design Consultants nor assign or transfer, voluntarily or involuntarily, any of its rights, duties or obligations under this Agreement except upon the prior written consent of City. Any such change, assignment or transfer without the prior written consent of the City shall be deemed null and void and constitute a material breach under this Agreement.
Section 25: Indemnification
25.1 To the fullest extent permitted by the law, DB shall indemnify, defend, protect and hold harmless City, their elected and appointed officers, agents, employees, consultants, (collectively herein the “Indemnitees”), from and against all claims, demands, causes of action, damages, injuries, liabilities, losses and expenses (including, without limitation, reasonable attorneys’ and consultants’ fees and expenses) of any kind whatsoever, arising in whole or in part out of or resulting from DB’s performance of this Agreement, DB’s breach of this Agreement, or the alleged negligent acts or omissions of DB, its architects, engineers, other professionals and consultants, Contractors, suppliers or anyone directly or indirectly employed by any of them or anyone for whose acts they may be liable. The obligations of the DB under this paragraph for errors or omissions, including those of the design professional subcontractors, which includes the Design Subcontractors, consultants, agents and employees thereof (“Design Subcontractors”), which arise from (1) the preparation or approval of maps, drawings, opinions, reports, surveys, designs or specifications, or (2) the giving of or the failure to give directions or instructions shall not be limited to the amount of coverage provided for in the professional liability insurance policy. If City is fully reimbursed by DB’s insurance for any loss covered by this paragraph, DB shall have no further obligation for such loss.
25.2 DB’s obligation to indemnify under Section 25.1 shall not extend to such claims, demands, causes of action, damages, injuries, liabilities, losses and expenses, to the extent that such is the result of the active negligence or the willful misconduct of an Indemnitee. DB’s obligation to defend under Section 25.1, if not covered by the insurance to be provided on the Project, shall not extend to such claims, demands, causes of action, damages, injuries, liabilities, losses and expenses, or causes of actions, to the extent that such are caused by the active negligence or the willful misconduct of the Indemnitee, and from no other cause.
25.3 DB shall ensure that any asbestos or hazardous or toxic substances encountered on the site is properly removed and disposed of in accordance with all state or federal statutes or regulations. DB’s obligation regarding the removal or disposal of asbestos or hazardous or toxic substances, products or materials shall be limited to the proper removal within the Project boundaries and the proper disposal of such materials. The DB agrees to the fullest extent permitted by law, to indemnify, defend, and hold harmless the City, its elected and appointed officers, employees, agents and consultants from and against any and all claims, suits, demands, liabilities, losses, or costs, including reasonable attorney’s fees and defense costs, resulting or accruing to any and all persons, firms, and any other legal entity, caused by, arising out of or in any way connected with the removal or disposal of any asbestos or hazardous or toxic substances, products or materials that exist on the jobsite whether liability arises under breach of contract or warranty, tort, including negligence, strict liability or statutory liability or any other cause of action.
11/10/2026 C6 144 of 357
Design / Build Services Agreement
BUILDING CIMPROVEMENTS PROJECT (CIP No. 8363)
00105692 1
Section 26: Right to Terminate and Suspend Work
26.1 Archaeological and Paleontological Discoveries: If a discovery is made of an archaeological or paleontological interest, DB shall immediately cease operations in the area of the discovery and shall not continue until ordered by City. When resumed, operations within the area of the discovery shall be as directed by City.
26.1.1 Discoveries which may be encountered may include, but are not be limited to, dwelling sites, stone implements or other artifacts, animal bones, human bones, fossils or any item with cultural significance.
26.1.2 DB shall be entitled to an extension of time and compensation in accordance with the provisions of this Agreement.
26.2 Termination of Agreement by City for Cause: If, through any cause, DB shall fail to fulfill in a timely and proper manner DB’s obligations under this Agreement, or if DB shall violate any of the covenants, agreements or stipulations of this Agreement, City shall have the right to terminate this Agreement by giving written notice to DB of such termination and specifying the effective date thereof at least five (5) days before the effective date of such termination. All finished or unfinished documents, data, studies, drawings, maps, plans, specifications, reports, electronic files, and other materials prepared by DB, or any of its agents, Design Consultants or Subcontractors, shall, at the option of the City, become the property of the City, and DB shall be entitled to receive just and equitable compensation for any work satisfactorily completed on such documents and other materials up to the effective date of Notice of Termination, not to exceed amounts payable hereunder, and less any damages caused by DB’s breach.
26.2.1 In the event the Agreement is terminated in accordance with this Section, City may take possession of the Project and may complete the Project by whatever method or means City may select.
26.2.2 If the cost to complete the Project exceeds the balance, which would have been due, DB shall pay the excess amount to City.
26.2.3 Rights of City Preserved: Where DB’s services have been so terminated by City, the termination will not affect any rights or remedies of City against DB then existing or which may thereafter accrue. Any retention or payment of moneys due DB by City will not release DB from liability. It is agreed that termination hereafter will not in any way release, waiver, or abridge any rights the City has against DB’s performance bond surety.
26.3 Any dispute as to the amount due or owed to DB upon termination under this section shall be resolved in accordance with Section 26.
26.4 Termination for Convenience by City: City may terminate this Agreement at any time and for any reason, by giving specific written notice to DB of such termination and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. In that event, all finished and unfinished documents and other materials described hereinabove shall, at the option of the City, become City’s sole and exclusive property. If the Agreement is terminated by City as provided in this paragraph, DB shall be entitled to receive just and equitable compensation for any satisfactory Work completed to the effective date of such termination. DB hereby expressly waives any and all claims for damages or compensation arising under this Agreement except as set forth herein.
11/10/2026 C6 145 of 357
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363)
00105692 1
26.4.1 Records and Documents Relating to Termination: Unless otherwise provided in the Agreement or by statute, DB shall maintain all records and documents relating to the terminated portion of this Agreement for three (3) years after final settlement. This includes all books and other evidence bearing on DB’s costs and expenses under this Agreement.
DB shall make these records and documents available to City, at DB’s office, at all reasonable times, without any direct charge. If approved by the City Manager, photographs, electronic files, microphotographs, or other authentic reproductions may be maintained instead of original records and documents.
26.5 Upon receipt of the Notice of Termination, DB shall take any action that may be necessary, or that the City Manager may direct, for the protection and preservation of the property related to this Agreement that is in the possession of DB and in which City has or may acquire an interest.
26.6 Payment to DB Due to Termination - DB and the City Manager may agree upon the whole or any part of the amount to be paid because of the termination. The amount may include a fee proportional to the percentage of work satisfactorily completed. However, the agreed amount may not exceed the total dollar amount authorized by City as reduced by the amount of payments previously made.
26.7 Failure to Agree on Payment - If DB and City fail to agree on the whole amount to be paid because of the termination of Project, City shall pay DB the fair and reasonable amounts determined in good faith by City as follows, but without duplication of any amounts agreed to above:
26.7.1 The price for completed services accepted;
26.7.2 The costs incurred in the performance of the Project terminated, including initial costs and preparatory expense allocable thereto. These costs are only for Work completed and accepted by the City based on an audit of all Contractors’ bills of materials and the timecards for Work actually performed;
26.7.3 DB and Design Subcontractor services through the date of termination shall be paid based on actual time spent as documented on timecards. Expenses shall be paid based on invoice and receipts provided by DB;
26.7.4 Under no circumstances will DB be entitled to any consideration for lost profit or lost opportunity costs;
26.8 If DB does not agree that the amount determined by the City Manager is fair and reasonable and if DB gives notice of such disagreement to City within thirty (30) days of receipt of payment, then the amount due shall be as later determined pursuant to the Dispute Resolution procedures in Section 26.
26.9 Payment for Property Destroyed, Lost, Stolen or Damaged - Except to the extent that City expressly assumed the risk of loss, the City Manager shall exclude from the amounts payable to DB under this Section, the fair value, as determined by the City Manager, of property that is destroyed, lost, stolen, or damaged so as to become undeliverable to City.
26.10 Deductions - In arriving at the amount due DB under this section, there shall be deducted:
26.10.1 Any claim which City has against DB under this Agreement; and 11/10/2026 C6 146 of 357
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363)
00105692 1
26.10.2 The agreed price for, or the proceeds of sale of, materials, supplies, or other things acquired by DB or sold under the provisions of this clause and not recovered by or credited to City.
26.11 Termination of Agreement by DB:
26.11.1 DB may terminate the Agreement upon ten (10) days written notice to City, whenever:
26.11.1.1 The Project has been suspended under the provisions of Section 26.1 or 26.2, for more than ninety (90) consecutive days through no fault or negligence of DB, and notice to resume Work or to terminate the Agreement has not been received from Ci ty within this time period; or
26.11.1.2 City should fail to pay DB any monies due it in accordance with the terms of this Agreement and within ninety (90) days after presentation to City by DB of a request therefore, unless within said 10-day period City shall have remedied the condition upon which the payment delay was based.
26.11.2 In the event of such termination, DB shall have no claims against City except for those claims specifically enumerated in Section 26.9, herein, and as determined in accordance with the requirements of said Section.
Section 27: Independent Contractor
27.1 DB and any Design Consultant, Contractor, Subcontractor, agent or employee of DB, shall act as an independent contractor and not as an agent, officer or employee of City. Except as expressly provided in this Agreement, City assumes no liability for DB’s actions and performance; in particular, but without limitation, City assumes no responsibility for paying any taxes, bonds, payments or other commitments, implied or explicit, by or for DB. DB acknowledges that it is aware that because it is an independent contractor, City is making no deductions from the fees for services being paid to DB and that City is not contributing to any fund on the behalf of DB. DB disclaims the right to any type of additional fee or benefits.
Section 28: Independent Judgment
28.1 Unless otherwise directed in writing by City, DB shall, in providing the professional services required by this Agreement, arrive at conclusions with respect to the rendition of information, advice and recommendations, independent of the control and direction of City, other than normal contract monitoring; DB, however, shall possess no authority with respect to any City decision beyond rendition of such information, advice and recommendations. DB shall not have the authority to act as an agent on behalf of City unless specifically authorized to do so by City in writing.
Section 29: Maintenance of Records and Accounting
29.1 DB shall maintain, during the Project and for a period of three (3) years after completion of the Project, accurate and organized records of all costs of any type and all services performed under this Agreement. City will have the right at any time, including during the performance of all Phases of the Project to audit and copy all such records. 11/10/2026 C6 147 of 357
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363)
00105692 1
Section 30: Ownership of Documents
30.1 Drawings, plans and specifications, and all reports, studies, tracings, maps, electronic files, and other documents prepared or obtained by DB in the course of performing the work under this Agreement shall be the property of City, and DB shall convey and transfer all copyrightable interests in such drawings, plans and specifications, documents to City. Basic survey notes, sketches, charts, computations and similar data prepared or obtained by DB under this Agreement shall, upon request, be made available to City. City agrees to use the original plans and drawings for purposes of this construction project only and will not use the original plans or drawings in connection with any other construction project. City agrees to indemnify, defend and hold harmless DB against any claims, losses, costs or damages as a result of City's reuse or misuse of such plans, drawings and specifications. In the event of the return of the plans, drawings, or specifications to DB or its representative, DB shall be responsible for their safe return to City. DB shall be entitled to retain copies of the plans, drawings and specifications for their files.
Under no circumstances shall DB fail to deliver any draft or signed and sealed final plans, drawings or specifications to City upon written demand by City for their delivery, notwithstanding any disputes between DB and City concerning payment, performance of Agreement, or otherwise.
This covenant shall survive the termination of the Agreement.
30.2 Title to Intellectual Property. DB shall represent that it has secured all necessary licenses, consents or approvals to use the components of any intellectual property, including computer software, used in the rendering of services and the production of the materials for the Project and that City has full legal title to and the right to reproduce such materials. DB covenants to defend, indemnify and hold City harmless of any loss, claim or liability in any way related to a claim that City is violating, as a result of any services rendered by the DB, either any contractual provisions or any federal, state or local law, relating to trade names, licenses, franchises, patents or other means of protecting interests in products or inventions.
Section 31: Force Majeure
31.1 Any party to this Agreement may be excused for any delay or failure to perform its duties and obligations under this Agreement, except for obligations to pay money, but only to the extent that such failure or delay is caused by an Event of Force Majeure as set forth in Section 31.2. If an Event of Force Majeure set forth in Section 31.2 causes a delay or failure in performance of only a portion of the obligations of a Party under this Agreement, then only that portion of performance which was delayed or prevented by such cause shall be deemed excused, and the performance of all other obligations of a Party not so delayed shall not be excused by an Event of Force Majeure. Delay or failure in performance of all other obligations of a Party not so delayed shall not be excused by such Event of Force Majeure. Delay or failure in performance by a Party which is the result of an Event of Force Majeure set forth in Section 31.2 shall be deemed excused for a period no longer than the delay or failure in performance caused by such Event.
31.2 An Event of Force Majeure means an occurrence beyond the control and without the fault or negligence of a Party, including but not limited to unusually severe weather, flood, earthquake, fire, lightning, and other natural catastrophes, acts of God or the public enemy, war, terrorist act, riot, insurrection, civil disturbance or disobedience, strike or labor dispute for which DB is not responsible, expropriation or confiscation of facilities, changes of applicable law, or sabotage of facilities, so long as such Party makes good faith and reasonable efforts to remedy the delays or failures in performance caused thereby. However, DB, in developing the GMP and Project Schedule, has incorporated three (3) days for anticipated adverse weather days that may disrupt work on the Project; DB shall be entitled to relief under this Section for adverse weather only to the extent adverse weather days exceed this amount of days. 11/10/2026 C6 148 of 357
00105692 1
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363)
31.3 A Party shall give written notice to the other Party as soon after becoming aware of the delay or failure in performance caused by an Event of Force Majeure as is reasonably possible, but in any event within five (5) working days after Party becomes aware of such delay or failure.
31.4 No Event of Force Majeure shall be a basis for monetary adjustment to the GMP. Costs incurred by the DB as a result of a Force Majeure Event will be reimbursed according to the terms of this Agreement from the Contingency Fund.
Section 32: Hazardous Materials
32.1 In the event the DB or any other party encounters asbestos or hazardous or toxic materials at the Project Site, or should it become known in any way that such materials may be present at the Project Site or any adjacent areas that may affect the performance of the DB’s service s, the DB may, at his or her option and without liability for consequential or any other damages, suspend performance of services on the Project until the City retains appropriate specialist consultant(s) or contractor(s) to identify, abate and/or remove the hazardous or toxic materials, and warrant that the Project Site is in full compliance with applicable laws and regulations.
Section 33: Disputes
33.1 All claims, counterclaims, disputes, and other matters in question arising under, or relating to, the Agreement or the breach thereof shall be processed in accordance with the provisions of this Section, unless specifically addressed by another provision of this Agreement.
33.2 DB shall submit its written request for additional compensation for work beyond the scope of this Agreement to City pursuant to Section 9. City shall make a determination on DB’s request in writing within 7 days of receipt of request and all supporting data. Said request for approval of work beyond the scope of this Agreement shall be made in good faith and accurately reflect the adjustment in project fee or schedule for which DB believes City is liable, and covers all costs and delays to which DB believes it is entitled as a result of the occurrence of the claimed event. All requests for adjustment in schedule shall include an analysis of the impact of the claimed work on specific activities on the schedule.
33.3 If DB disagrees with City’s determination, DB shall file a claim in writing in accordance with the procedures set forth in Chapter 1.28 of the Vista Municipal Code, as same may from time to time be amended, the provisions of which are incorporated by this reference as if fully set forth herein, and such policies and procedures used by the City in the implementation of the same.
33.4 Pending final resolution of any claim, including litigation, DB shall proceed diligently with performance of the Project, and comply with any direction of City.
Section 34: Notices
34.1 All notices, demands or other communications hereunder shall be given or made in writing and shall be delivered personally or sent by courier or registered or certified mail, return receipt requested, postage prepaid, addressed to the Party to whom they are directed at the following addresses, or at such other addresses as may be designated by notice from such Party:
To CITY:
Engineering Department
Attn: Allison McLaughin
11/10/2026 C6 149 of 357
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363)
00105692 1
200 Civic Center Drive
Vista, CA 92084
To DB:
XXX
XXX
XXX, CA XXX
Any notice, demand or other communication given or made solely by mail in the manner prescribed in this Section shall be deemed to have been given and to be effective three (3) days after the date of such mailing; provided, however, that any notice, demand or other communication which would otherwise be deemed to have been given on a day which is not a working day shall be deemed to have been given on the next subsequent working day.
Section 35: Miscellaneous Terms
35.1 Representations: Each Party hereto declares and represents that in entering into this Agreement it has relied and is relying solely upon its own judgment, belief and knowledge of the nature, extent, effect and consequence relating thereto. Each Party further declares and represents that this Agreement is being made without reliance upon any statement or representation of any other Party not contained herein, or any representative, agent or attorney of any other Party.
35.2 Severability: If any term or condition of this Agreement is held to any extent to be invalid or unenforceable, all the remaining terms and conditions shall be enforceable to the fullest extent permitted by law.
35.3 Entire Agreement: This Agreement contains the entire agreement, between the Parties and supersedes all prior negotiations, discussions, obligations and rights of the Parties in respect of each other regarding the subject matter of this Agreement. There is no other written or oral understanding between the Parties. No modification, amendment or alteration of this Agreement shall be valid unless it is in writing and signed by the Parties hereto.
35.4 Drafting Ambiguities: The Parties agree that they are aware that they have the right to be advised by counsel with respect to the negotiations, terms and conditions of this Agreement, and that the decision of whether or not to seek the advice of counsel with respect to this Agreement is a decision which is the sole responsibility of each of the Parties hereto. This Agreement shall not be construed in favor of or against either Party by reason of the extent to which each Party participated in the drafting of the Agreement.
35.5 Applicable Law: The formation, interpretation and performance of this Agreement shall be governed by the laws of the State of California. Venue for mediation, arbitration and/or actions arising out of this Agreement shall be in the City of Vista, California.
35.6 Waiver: Unless otherwise expressly provided herein, no delay or omission by the Parties hereto in exercising any right or remedy provided for herein shall constitute a waiver of such right or remedy, nor shall it be construed as a bar to or a waiver of any such right or remedy on any future occasion.
35.7 Effect of Headings: Headings appearing in this Agreement are inserted for convenience of reference only, and shall in no way be construed to be interpretations of the provisions hereof. 11/10/2026 C6 150 of 357
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363)
00105692 1
35.8 Amendments: This Agreement may be modified, amended or supplemented only by the mutual written agreement of the Parties hereto.
35.9 Authorization and Compliance: Each Party represents that it is duly authorized to execute and carry out the provisions of this Agreement.
35.10 Further Assurances: The Parties agree to do such further acts and things and execute and deliver such additional agreements and instruments as the other may reasonably require to consummate, evidence or confirm the agreements contained herein in the manner contemplated hereby.
35.11 Counterparts: This Agreement may be executed by the Parties in one or more counterparts, all of which taken together shall constitute one and the same instrument. The facsimile signatures of the Parties shall be deemed to constitute original signatures, and facsimile copies hereof shall be deemed to constitute duplicate original counterparts.
35.12 Exhibits: All Exhibits are incorporated herein by reference into this Agreement.
35.13 Third Party Beneficiary: Nothing within this Agreement shall create a contractual relationship between the City and any third party.
35.14 Counterparts; Electronic Signatures; Electronic Delivery: This Agreement may be executed in separate counterparts, none of which need contain the signatures of both Parties, and each of which, when so executed, shall be deemed an original and all together shall constitute and be one of the same instrument. The Parties agree that this Agreement, whether executed by electronic signature, digital signature, or constituting a scanned or electronically reproduced copy or image of this Agreement bearing the signatures of the Parties, will be deemed an original and will represent competent evidence of the execution, terms and existence of this Agreement notwithstanding the failure or inability to produce an original executed Agreement or counterpart thereof, and without the requirement that the unavailability of such original executed Agreement or counterpart thereof first be proven. Further, the exchange of this entire executed Agreement and/or such exhibit(s) or document(s)) that is in photostatic or portable document format (.pdf) form by electronic mail or by another electronic means shall be considered original(s) and shall constitute effective execution and delivery of the original(s).
Section 36: Prevailing Wages; Labor Law Compliance
This contract is subject to the provisions of Division 2, Part 7, Chapter 1 (commencing with Section 1720) of the California Labor Code relating to public works. Design-Builder agrees to execute City’s Agreement to Comply with California Labor Law Requirements (Exhibit 5) and to comply with the Labor Code to the extent that work under this Agreement is subject to those requirements.
11/10/2026 C6 151 of 357
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363
00105692 1
Section 37: Execution
IN WITNESS WHEREOF; the Parties hereto have executed this Agreement as of the Agreement Date.
City”
CITY OF VISTA, a chartered municipal
corporation
BY:
JOHN FRANKLIN, MAYOR
ATTEST:
KATHY VALDEZ, CITY CLERK
BY:
APPROVED AS TO FORM:
WALTER CHUNG, CITY ATTORNEY
BY:
RISK MANAGEMENT REVIEW:
ANALISA HOLBROOK, RISK
MANAGER
BY:
Design Builder”
XXX, XXXX
By:
Name/Title
BY:
Name/Title
11/10/2026 C6 152 of 357
Design / Build Services Agreement
BUILDING C IMPROVEMENTS PROJECT (CIP No. 8363)
00105692 1
EXHIBIT LIST
1.Design/Build Services Proposal, Schedule of Rates, and Project Schedule
2.Insurance and Bonding Requirements
3.Request for Proposal (RFP)
4.Project Site
5.Agreement to Comply With California Labor Law Requirements 11/10/2026 C6 153 of 357
00043997 1 1 of 4
APPENDIX B
INSURANCE AND BONDING REQUIREMENTS
Contractor shall procure and maintain for the duration of the Contract, and for one year thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
1.Commercial General Liability (“CGL”): Insurance Work Office Form CG 00 01 covering CGL on an “occurrence” basis, including products, completed operations, property damage, bodily injury, and personal & advertising injury with limits no less than 2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Project/location or the general aggregate limit shall be twice the required occurrence limit.
2.Automobile Liability: Insurance Work Office Form Number CA 0001 covering Code 1 any auto), with limits no less than $2,000,000 per accident for bodily injury and property damage.
3.Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
4.Surety Bonds as described below.
Contractor shall also provide the additional coverages checked below and at least as broad as:
5. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and Omissions (if Project involves environmental hazards) with limits no less than 1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
6. Builder’s Risk (Course of Construction) insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the Project and no coinsurance penalty provisions.
7. Professional Liability (if Design/Build), with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
If the contractor maintains higher limits than the minimums shown above, the City requires and shall be entitled to coverage for the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
Deductibles and Self-Insured Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the contractor shall cause the insurer shall reduce or eliminate such X
X
X
11/10/2026 C6 154 of 357
00043997 1 2 of 4
deductibles or self-insured retentions as respects the City, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration, and defense expenses.
Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:
1. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10 and CG 20 37 forms if later revisions used), unless otherwise approved in advance by City.
2. For any claims related to this Project, the Contractor’s insurance coverage shall be primary insurance as respects the City, its officers, officials, employees, and volunteers.
Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.
3. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the City.
Builder’s Risk (Course of Construction) Insurance
Contractor may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City as a loss payee as their interest may appear.
If the Project does not involve new or major reconstruction, at the option of the City, an Installation Floater may be acceptable. For such Projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City’s site.
Claims Made Policies
If any coverage required is written on a claims-made coverage form:
1. The retroactive date must be shown, and this date must be before the execution date of the Contract or the beginning of Contract work.
2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of Contract work.
11/10/2026 C6 155 of 357
00043997 1 3 of 4
3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the Contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five 5) years after completion of Contract work.
4. A copy of the claims reporting requirements must be submitted to the City for review.
5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to the City.
Waiver of Subrogation
Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents and subcontractors.
Verification of Coverage
Contractor shall furnish the City with original certificates and amendatory endorsements, or copies of the applicable insurance language, effecting coverage required by this Contract. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.
Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format least as broad as CG 20 38 04 13.
Surety Bonds
Contractor shall provide the following Surety Bonds if checked:
1. Bid Bond.
2. Payment Bond and Performance Bond.
3. Maintenance Bond.
11/10/2026 C6 156 of 357
00043997 1 4 of 4
The Payment Bond and the Performance Bond shall be in an amount equal to the Contract Ceiling Price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the Contract is for longer than one year a Maintenance Bond equal to 10% of the Contract price is required.
Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances. 11/10/2026 C6 157 of 357
APPENDIX C
Project Vicinity Map
11/10/2026 C6 158 of 357
ProProposed
BUILDING C IMPROVEMENTS
11/10/2026 C6 159 of 357
APPENDIX D
Building C Plans
11/10/2026 C6 160 of 357
i
YwrAs S BU DING
C87:rY 0 F V X
A AVXT8offN19
RUHNAU • RUMNAU ASSOC1A TES 3775 Tenth Street 5751 Palmer Way, Suite C Architects / Planners Riverside, California, 92501 Carlsbad, California 92008 760)438-5899 FAX (760) 931-8194
A5SREVIAT ONS SHEET INDEX TITLEGENERA..NO ES
AB
AG
AGP
ACT
AFF
ALUM
AN
AP
AFC-
ATG
AWP
BD
BLDG
BLKG
BM
SUR
GAB
C3C,ON
Ci
CJ
GL
GLR
CMU
COL
GONG
CPL
GIFT
GST
GT
DET
DF
DG
DIA
DIM
DN
DR
D5
DSA
E)
E `
ELEG
ELEV
ENCL
EQ
ES
ESP
EXP
EXT
EWG
FD
FEG
FF
FG
FHG
FHNS
FIN'
FL
FLR
FOG
FOMFOM
FOS
FRA
FRP
FRT
FURN
GA
GALV
GI
GLULAMGLUE
GPL
GSM
GWB
GWw
H
HB
HDW
HM
HORIZ
HR
INSUL
NT
VNV
JT
1ST
KGPL
K5
LAB
LAS
LMB
LP
MACH
ANGLE MAX MAXIMUM
ANCHOR SOLT MCB METAL CORNER BEAD
ASPHALTIC CONCRETE MECH MECHANICAL
ACOUSTIC CEILING PANEL MFR MANUFACTURER
ACOUSTIC TILE MH MANHOLE
ABOVE FINISHED FLOOR MIN MINIMUM
ALUMINUM MISC., MISCELLANEOUS
ANODIZED MO MASONRY OPENING
ACOUSTIC PAINT MTL METAL
ACOUSTIC PANEL CEILING MWF METAL WALL PANEL
ACOUSTIC TILE GEILING
ACOUSTIC WALL PANEL (N) NEW
NIC NOT IN CONTRACT
BOARD NTS NOT TO 5G ALE
OBU
BLOCKING OG ON CENTER
BENCH MARK OD OUTSIDE DIAMETER
SUILT-UP ROOFING OFCI OWNER FURNISHED, CONTRACTOR INSTALLED 05A OFFICE OF STATE ARCHITECT
CABINET
COVE BASE P FAINT
GOLORED CONGRETE PGH PATCH
CAST IRON PGPL PORTLAND GEMENT PLASTER
CONSTRUCTION/COLD J01NT FEIN PREFINISHED
CENTERLINE PH PANIC HARDWARE
CLEAR PIF PAINTED INSULATION FACING
CONCRETE MASONRY UNIT PEAS PLASTER
COLUMN PLAM PLASTIC. LAMINATE
CONCRETE PL PLATE/PROPERTY LINE/PLASTIC, LAMINATE
CEMENT PLASTER PLB PLASTERBOARD
CARPET PLWD PLYWOOD
CONCRETE STAIN FR FAIR
CERAMIC: TILE QT QUARRY TILE
DETAIL R RADIUS/RISER/REMOVABLE MULLION
DRINKING FOUNTAIN RE, RUBBER BASE
DECOMPOSED GRANITE RD ROOF DRAIN
DIAMETER REF REFERENCE
DIMENSION REINF REINFORCING
DOWN REQ'D REQUIRED
DOOR RM ROOM
DOWNSPOUT RO ROUGH OPENING
DIVISION OF STATE .ARCHITECT RSLB RESILIENT BASE
EXISTING SB SPLASH BLOCK
EAGH
EXAPANSION JOINT
SC SOLID CORE
SGHED SCHEDULE
ELEGTRIG SD STORM DRAIN
ELEVATION S&P SEMI GLOSS PAINT
ENCLOSURE SHT SHEET
EQUAL SHTH SHEATHING
EXPOSED STRUCTURE SIM SIMILAR
EGG SHELL PAINT SPEC SPECIFICATIONS
EXPOSED/EXTERIOR PAINT SO SQUARE
EXTERIOR
SRF SEAMLESS RESILIENT FLOORING
ELEGTRIG WATER COOLER 55 STAINLESS STEEL
FLOOR DRAIN STG SOUND TRANSMISSION GLASS
FIRE EXTINGUISHER. CABINET
STD STANDARD
STE STEELF!NISH FLOOR/ FACTORY FINISH
STN STAINFINISHGRADE
SIRE HOSE CABINET
STIR STRUCTURAL/STRUCTURE
FLAT HEAD WOOD SCREWS -
STSMS SELF TAPPING SHEET METAL SCREWS
SUSP SUSPENDED
FINISH 5V SHEET VINYL
FLOWL!NE
FLOOR TB TAGKSOARD
FACE OF CONCRETE TG TOP OF CURB
FACE OF MASONRY TER TERRAZZO
FACE OF STUD TG TOP OF GRATE
FIRE RATED ASSEMBLY TJ TOOLED JOINT
FIBERGLASS REINFORCED PANEL TMX TO MATCH EXISTING
FrE RETARDANT TREATED TOS TOP OF STEEL
FURNISH/FURNITURE TOP TOP OF PARAPET
GAUGE TOW TOP OF WALL
TP TOP OF PAVINGGALVANIZEDTSTOPofSHEATHING
GALVANIZED IRON TYP TYPIGAL
LAMINATED
GYPSUM PL AS I ER UG UNDER CUT
GALVANISED SHEET METAL UNO UNLESS NOTED OTHERWISE
GYPSUM WALLBOARD
WATER E=f SISTANT GWB
VAR VARIES
VGT VINYL COMPOSITION TILE
HANDICAPPED VF VINYL FABRIC
HOSE 5155 VERT VERTICAL
HARDWARE
VSF VINYL SHEET FLOORING
HARDWOOD'HCHORE
VT VINYL TILE
HOLLOW METAL
VTS VINYL TACK SURFACE
HORIZONTAL VWG VINYL WALL COVERING
FOUR W/ WITH
wG WATERCLOSET
INSULATION WD WOOD
INTERIOR WGL WIREGLA55
INVERT WH WATER HEATER
JOINT WV WOOD VENEER
JOIST WWF WELDED WIRE FABRIC
KEENES CEMENT PLASTER X FACTORY FINISHED /PREF!NISHED/ EXISTING
KNEE SPACE XAP EXISTING ACOUSTIC PLASTER
XAPG EXISTING ACOUSTIC PANEL CEILING
LABORATORY XAT EXISTING ACOUSTIC TILE
LAVATORY XG EXISTING GRADE
LAMINATED MARKER BOARD XGB EXISTING GYPSUM BOARD
LAMINATED PLASTIC XPL EXISTING PLASTER
XTR EXISTING TO REMAIN
XTZ EXISTING TERRAZZO
MACHINE XWB EXISTING WOOD BASE
I. Contractor shall verify all dimensions and locations conditions on the fob site prior to the start
of the Work. Notify the Architect immediately
between actual field conditions and construction
conditions are indicated as a result of information
available documents. Any damage to existing
responsibility of the Contractor.
2. Contractor shall notify the Architect immediate)
or inconsistencies in the contract documents.
not proceed with the work until a clarification
the Architect.
3. In no case shall working be scaled
or details on the drawings.
4. All standards, materials and workmanship shall
State Building Code and all other governing
and laws. All work shall conform to Title 24,
5. Where any conflict occurs between the requirements
and Local la wscodes, regulations, , ordinances, rules and stringent shall govern.
environmental health considerations shall comply
7. Details marked "typical" shall apply in all cases
indicated otherwise.
a The terms "install" or "provide" shall mean
q. Contractor shall coordinate between the requirements disciplines, (Architectural, Structural, Plumbing,
and between drawing andspecification requirements,
in order that all items relating to one another
places coordinate. Notify Architect immediately
not coordinated.
10. A project inspector employed by the district
Division of the State Architect shall provide
The duties of the inspector are defined inp
I I . Prior to trenching for underground utilities,
Utilities. Owner will furnish sets of As -Built
for this purpose. Repair of damage to utilities
be at CONTRACTORS EXPENSE.
of existing
of Work or portions
of any discrepancies
documents. Existing
shown on
conditions is the sole
of any discrepancies,The Contractor shall
has been issued by
plans,from sections
comply with the
codes, ordinances, regulations
California ode of Re ulations(GCR).g
of Federal, State
the most
6. Gradingplans, drainageimprovements, roadandaccessrequirementsandELECTRICAL with all local ordinances.
unless specifically
furnish and install."
of all the
Mechanical, Electrical)
shown in several
regarding any items
owner) and approved by the
continuous inspection of the work.p
Section 4-342, Part I, Title 24, GGR.
verify the location of all Underground
Drawings of existing buildings and site
shown on As -Built Drawings shall
T TITLE SHEET STRUCTURAL SHEET I NDEX NOTE
WASTEWATER
SERVICES
BUILDING
2.90. 10
CficrY
OLD
VEA‘
SUI PARTIAL TOPOGRPHY SURVEY S -I FOUNDATION PLANS EACH BIDDER SHALL EXAMINE THE DRAWINGS OF CONSTRUCTION DOCUMENTS TO DETERMINE THAT ALL SHOWN ON THE SHEET INDEX ARE INCLUDED WITH EACH SET RECEIVED. THE FAILURE OF ANY BIDDER TO EXAMINE OR RECEIVE ANY PART OF THE CONSTRUCTIONG-1 GRADING $ EROSION CONTROL NOTES S_2 FOUNDATION DETAILS DOCUMENTS INDICATED ON THE INDEX SHALL NOT RELIEVE THE BIDDER FROM THE OBLIGATION OF THESE DOCUMENTS.AND SECT IONSG-2 GRADING PLAN NOTIFY ARCHITECT OF Ajsj,,, pISCREPANCIESI
pARC, I TECTURAL MECHAN I CAL
Ai PARTIAL SITE PLAN M-I.I HVAG $ PLUMBING FLOOR PLANSAl.! SITE DETAILS AND SCHEDULES DEFERRED AF' 'ROVALS A2 FLOOR PLAN M-2.1 HVAG DETAILS
I . PRE-ENGINEERED BUILDING
A5 REFLEGTED GE I L I NG PLAN/ M-2.2 FLUME3 I NG DETAILS
ENLARGEDTO I LET ROOM PLAN
A4 ROOF PLANS
ENERC`I' CACULATIONSASEXTERIORELEVATIONS/
BUILDING SECTIONS
T-24 TITLE 24
AS WALL SECTIONS
A7 NOT USED EO. i SYMBOL LIST, FIXTURE SCHEDULE
SINGLE LINE DIAGRAM
AS INTERIOR ELEVATIONS
Af INTERIOR ELEVATIONS EO.2 SITE PLAN
AI INTERIOR ELEVATIONS EI.1 LIGHTING PLAN
E2.1 POWER AND SIGNAL PLANAlIFINISHSCHEDULE
AND TOILET ROOM DETAILS
Al2 DOOR SCHEDULE
AND SIGNAGE DETAILS
A 1 5 GEILING tf CASEWORK DETAILS
A14 ROOF MISC DETAILS
AIS DOOR WINDOW DETAILS
t
I j U Ni
A j I
STRUCTURAL ENGINEER ELECTRICAL ENGINEER
KANDA TSO ASSOC/I ATES JRL ASSOG I ATES
511 MISSION STREET 2445 5 TH. AVENUE # 310
SOUTH PASADENA, GA q I O5O SAN DIEGO, GA 121 O i
818)441-1211 (611)235-6620
MECHANICAL ENGINEER SPECIFICATIONS
NAGK ENGINEERING GONSPEG GONSULTANTS `.
3551 GAMING MIRA GOSTA #K 3547-B GAMING DEL RIO S.
SAN GLEMENTE, GA '12672 SAN DIEGO, GA 012108
714)443- 755 (610f) 283-20-17
SITE G'C• u,r
R4
G`
No. G-2086
xp.3-31 C,9
1 k¢
1165 TAYLOR STREET
T O VISTA, GA cf2084
I
C-{V iti AREA
BUILDI
OF NEW CONSTRUCTION
NG E3 ,
4 ptD I P f eLa6A NEV SLAB FOUNDATION ONLY
V
V
r.
III
ii;OP.,IR
li'BUILDING G
o
l
Hi I it AREA OF NEW CONSTRUCTION1L0
Z
I.I Ip f airx s
NEW ADMINISTRATION BUILDING
AFLICAELE
r1 -11 ,`
BUILDING D
AREA OF NEW CONSTRUCTION
Construction shall be in conformance with the following codes.
Title 11
Title 24, Part I, G.G.R. - Office of the State Architect Title 24, Part 2, G.G.R. - icfG5 GBG (l 4 USC*)
Title 24, Part 3, G.G.R. - I1,15 GEC (11,13 NEC,*)
Title 24, Part 4, G.G.R. - 1115 GMG (I,114 UMG*)
Title 24, Part 5, G.G.R. - 1115 GPG (1114 UPC,*)
1Title24, Part , G.G.R. - 11,15 GFG (I°fg4 UFG*)
WITH CALIFORNIA AMENDMENTS
C
70 0 -II REMOVE PORTION OF BLDG. D;
NEW PARKING AREA
ON
I
i
L
511,6 I
0 teaQ
Z E3U I LD I NG DATA ,
l\V U
r
TD
BIULDING 5
OCCUPANCY : H-4
CONST. TYPE : V -N
ALLOWABLE AREA: 5,100 S.F.
EXISTING AREA : 4,000 5.F.
NEW AREA : 0
ACTUAL AREA : 4,000 S.F
BIULDING G
OCCUPANCY : B
CONST. TYPE : V -N
ALLOWABLE AREA: 5,000 S.F.
ACTUAL AREA : 4,464 S.F
BIULDING D
OCCUPANCY : 5-3
CONST. TYPE : V -N
ALLOWABLE AREA: 5,000 S.F.
EXISTING AREA : 4,000 S.F.
NEW AREA : -a6O S.F.
ACTUAL AREA : 3,040 S.F.
prawn by MARY BETS
Checked by
Date 5/.2- a/c7ri
Comm 15 510n No. O. o
Re°.,rsions Architects/Planners
AS- EtNATER SERV DES BU LD N,
C I TY O VISTA
VISTAIA
t C A L L O R I 1 I A
T T-,! SHEET r,rr :'\c,,,.-;ber
RUHNAU •RUHNAUASSOCIATES
0 t5
5751 Palmer Way, Suite C 3775 Tenth Street
Carlsbad, CA. 920088872 FBverside, CA, 92501_3669
760/ 4385899 909 / 684-4664
FAX: 760/ 931-8194 FAX: 909/ 684-6276
11/10/2026 C6 161 of 357
521.35
523.11
524.29
523.04
x
523.20
523.63
524.38
524.63
523.988/
EXIST. INLET
523.97
NOTE:
THIS MAP WAS PREPARED USING PHOTOGRAMMETRIC COMPUTER
AIDED DRAFTING. TECHNIQUES.
IN OPEN, UNOBSTRUCTED AREAS THIS MAP COMPLIES WITH
NATIONAL STANDARDS FOR MAP ACCURACY. IN AREAS OF
DENSE VEGETATION WHERE THE GROUND IS OBSCURED FROM VIEW, CONTOURS MAY DEVIATE FROM CORRECT ELEVATION.
FIELD SURVEY CONTROL PROVIDED BY: R.B. HILL & ASSOCIATES, INC.. x
527.13
x
529.16
EXIST.
AUXILIA'Y
POWER .TAT
528.89
X \
52 62
527.98
x
528.31
529.18
528.76
529.00
n
x"528.1$
528.60
EXISTING
BUILDING
F.F. 530.09
SEWER CLEANOUT
SEWER TRENCH
EXISTING
STREET LIGHT
BLDG. LINE
ROOF LINE
530.03 530.20
ELEC. BOX
x TYP. GUARD POST
529.34 529.44
x528.76
x
APPROX, LOCATION OF 529.14
6' WIDE SDG&E EASEMENT
PAINTED
529.86
30.05 EXISTING
BUILDING
SEWER CLEANOUT
529.60
x
x
529.70
533.73
2720 # R AVE. W. SUITE P CARLSBAD, CA 92008
EXIST. INLET
534:81- I /
DATE OF PHOTOGRAPHY
AUGUST 16, 1996
530.49
528. --
PES
530.50
x
53.0.1x1
529.78
2)
X529.77
Concrete" • X .529.4 1
EXISTING
BUILDING
F.F. 531.22
536,31- _
x
ENGINEER
530.96
PAINTED P KING S RIPES
I
PAINTED PARKING STRIPES
v / X
530.2.3
531 .25
530.27
EXIST. INLET
X
530.17
530.16
x XiSTI
574'F LIGHT
531.58
EC. TRENCH
PAINTE) PARKI G STRIPES
533.08
532. 1 ".32.7
EXIST. P•'OPERTY
x
532.57
RCE EXP. UC. DATE DATE
xi
531.991
X •
537.57
DESCRIPTION
APPROVED CHANGES
538.37
x539.09
539.66
x
541s12 x
540.78
APPROVED BY
SCALE 1" = 20'
ENGINEER OF WORK
R.B.HILL & ASSOCIATES, INC.
514 EAST VISTA WAY
VISTA, CA 92084-6014
TEL. (619) 94'1-2271
ENGINEER RCE EXP. LIC. DATE DATE
EASEMENT LIST
SCHEDULE B
BENEFIT LAND TITLE INSURANCE CU.
DUC, # 973972820 U.R,, DEC. 30, 1996
DESCRIPTION
2. V.I.D. PIPELINE, LOCATION NOT DISCLOSED
REC. OCT. 6, 192.5 BOOK 1125, PAGE 195 O.R.
V.I.D.EASEMENT OVER WHOLE SITE.
REC. DEC. 12, 1940 BOOK 115, PAGE 109 O.R.
1 1. ROAD EASEMENT
REC. #73-087593 APR. 4,1973 O.R.
21. SDG&E EASEMENT
REC. #78-306677 JUL. 21,1978
22. SEE ITEM 21
LEGEND
TYP. MOVEABLE STORAGE BIN OR TRAILER
TYP. PATIO TYPE COVER
TYP. BUILDING & FINISH FLOOR ELEV.
TYP. STREET LIGHT
CITY OF VISTA
BENCHMARK
TAYLOR STREET YARD
PART/AL TOPOGRAPHY
RCE EXP. UC. DATE DATE SHEET OF
DRAWING NO.
RBH J.N. 02-97
BENCHMARK
TAYLOR STREET YARD
PART/AL TOPOGRAPHY
RCE EXP. UC. DATE DATE SHEET OF
DRAWING NO.
RBH J.N. 02-97
11/10/2026 C6 162 of 357
GENERAL 66?ADINC NOTES
ALL GRADING IS TO BE DONE IN ACCORDANCE IITH THE CITY OF VISTA DEVELOPMENT CODE; CHAPTER 17. 56 AND THE SOILS REPORTS PREPARED BY 6'EOCON INCORPORATED DATED APRIL 1997
THIS GRADING PLAN DOES NOT AUTHORIZE FORK TO COMMENCE PRIOR TO THE ISSUANCE Or A GRADING PERMIT BY THE CITY OF VISTA.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL SUBSTRUCTURES PETER SHORN HEREON OR NOT, AND PROTECT THEM FROM DA4/AG,= THE EXPENSE OF EPA?R. OR REPLACEMENT OF SAID STRUCTURES SHALL BE BORNE BY TIE CONTRACTOR
BEFORE EXCAVATING, THE CONTRACTOR SHALL VERIFY THE L OCATION OF UNERGROUND Ci A TIES BY CONTACTING THE FOL.! O#INC
VISTA 726-1340 PACIFIC TELEPHONE 58.3-3589
CABLE UNDERGROUND SERVICE ALERT 471-9000
74 SANITATION 7261340
frJ TELEPHONE 58 --3889
D,7EGO GAS d ELECTRIC 234-6242
VI574 IRRIGATION DISTRICT 724-8811
J ` TION x'26-1340
fi' .THE DEVELOPMENT SERVICES /'EPARTHEENT !PILL BE REQUIRED PRIOR TO A,, - r` T HIN THE CITY OF VISTA RIGHT -0E-01.
No BUJL . 'ING PLWMI TS WILL BE ISSUED AND NO BUILDING INSPECTION /PILL BE MADE UNTIL ROUGH GRADING HAS BEEN APPROVED PER CITY Or VISTA
ALL CUT AND FILL SLOPES SHALL BE NO STEEPER THAN TIYO HORIZONTAL TO ONE VERTICAL UNLESS OTHERfYJSE SPECIFIED BY AN APPROVED SOILS ENGINEERING REPORT AND THE CITY ENGINEER.
ALL Si ORES S'i 4LL BE PLANTED IYITh' A GROUND COVER AS APPROVED BY THE CITY Or
VISTA ENGINEERING' DEPARTMENT
R THE FACE OF off AND/OR FILL SLOPES SHALL_BE PREPARED AND MAINTAINED TO CONTROL AGAINST EROSION PER CITY OF VISTA DEVELOPMENT CODE, ,CHAPTER 17 55
ALL MAJOR SLOPES SHALL BE ROUNDED PTO EXISTING TERRAIN TO PRODUCE A CONTOUPED TRANSITION FROM CUT OR FILL TO NATURAL • GROUND ABUTTING CUT AND FILL SURFACES. 10 A PRE JMINARY SOILS REPORT SHALL BE SUBMITTED PRIOR TO GRADING PLAN` APPROVAL.
A FINAL SOILS R'_ -PORT SMALL BE SUBMITTED IN DUPE ICATE PRIOR TO ROUGH GRADING APPROVAL AND H1/UST PROVIDE THE FOLLOJ"ING INFORM/4730N.
A 501Z5 REAR?/vt VAZOF
B. EXPANSIVE CHARACTERISTICS
2 FOUNDATION RECOMMENDATION
D DISPOSITION OF 1_ ARGE ROCKS' ENCROACHING ONTO THE FOUNDATION
E, COMPACTION A SPORT ON GRADED LOTS
F. ELF M TION OF 'ATER TABLE IF ENCOUNTERED
PLAT SHOOING THE LOCATIONS' OF TEST BORYNGS AND/OR %'XCAVAT'IONs 12 1 ALL ON SITE AND PRIVATE DR,IVEJMYS MUST HAVE A 19141.14101 THICKNESS OF 4 INCHES CONCRETE OR 2 INCHES ,4 /4L T OVER 6 INCHES DECOMPOSED 6>?AN.I TF (D. G: ) BASE A/VD :$/UST BE j? Y'ECTED BY THE EN6VNF RIMG DEPARTMENT TiE STRUCTURAL SECTION OF PARKING LOTS AND DRIVE -PIS ON ALL COMMERCIAL AND OUST'4'IAL COMPLEXES SHALL BE DESIGNED BASED ON "R" VALUES OF SOILS ON A T L OF 4:.5 MINIMUM SECTION SHALL BE 3" A C. ON 8" D. G. BASE OR MINIMUM 4" PCC
ON NATIVE STRUCTURAL SECTIONS DESIGN TO BE APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION ALL CURBS, GUTTERS .AND SIDE#ALKS MI/ST NAVE .A .MINIMUM OF 6" D 6 BASE DR AS RECOMMENDED BY THE SOILS [NCl/VTR AND APPROVED BY T// CITY ENGINEER'.
TAE PERYITTEE SHALL GIVE NOTICE TO THE CITY OF VISTA ENGINEERING INSPECTION D.'3`'ARTMENT FOR PRE -CONSTRUCTION CONFERENCE AT LEAST 48 HOURS PRIOR TO COM- 4ENCENG THE LYORK ANY /YORI( DONE II NWT PROPER INSPECTION NILE BE SUBJECT TO REJECTION PHONE 9x1-5267 FOR INSPECTIONS.
15 A .FENCE- AT LEASTT THREE AND ONE-HALF FEET (3-1/?'7 IA/ HEIGHT SHALL BE CONSTRUCTED 4T THE TOP OF ANY VERYIC,4L CUT OR. RETAINING 10ALL EXCEEDING FOUR FEET (4') IN hEIGHT OR AT THE TOP OF ANY CUT OR FILL EXCEEDING FIFTEEN FEET (15'1
IN HEIGHT
EROSION CONTROL OF SLOPES ALL SLOPES IN EXCESS OF 5 FEET IN VERTICAL HEIGHT SHALL BE 1/K0/?, OSEEDED IN ACCORDANCE $'ITH ThE FOL L OKINc SPECIFICATIONS UNLESS SUPERCEDED Br.:- AN APPROVED EROSION CONTROL OR LANDSCAPING PLAN) • HVDROSEEDING INSTALLATION.
2, 000 LBS/ACRE 100.8' fW00G FIBER MULCH
3OO LBS PER ACRE 15-5-8 COMMERCIAL FERTILIZER`
ECOLOGY CONTROL if --BENDER
140 1,95/ACRE 8ET7EEN THE MONTHS OF OCTOBER AND MARCH 0R:
80 LBS/LCRE BETWEEN THE MONTHS OF APRIL AND SEPTEMBER
Pi{' -/'OR TO INSTALLATION, ALL CUT SLOPES SHILL BE SCARIFIED OR RIPPED HORIZONTALL Y TO A DEPTH OF 3 TO 6 INCHES
V1CzN.TT' koo
LEGAL DESCRIPTION
A.P.N.
6L OT[C/It/!CAL CONSULTANT'S DELL 4R4 T!O/V
THESE PLANS HAVE BEEN REVI£!Y£L7 GEOTECH,NICAL ASPECTS OF THE PLANS HAVE BEEN FOUND TO BE IN CONFORMANCE ff1TH THE INTENTIONS OF THE FINDINGS AND RECOMMEND-- DATIONS CONTAINED IA/ THE GEOTECH:NICAL INVESTICATION BY GEOCON INCORPORATED TITLED.
Br`
f ,4S7f $ 47£R SERVICES BUYLDINC> CITY OF VISTA, 1165 TAYLOR STREET, VISTA; CALIFORNIA
1 t \
5j
N T. 5
v 1
C. f: _
DATE.'
RG E.
DATE.
Approval of these improvemnt plans does not guarantee
that water will be available nor does It commit district to supplying water to this project.
Valid for t*o years for date.
ENGINEER RCE EXP. LIC. DATE DATE
MPORM/VT NOTICE
SECTION 4216}'4217 OF THE G'OYERNMENT CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER 8E ISSUED BEFORE A "PERMIT TO EXCAVATE." Az BE VAL ID. FOR YOUR DM ALERT I. D, NUMBER CALL UNDERGROUND SERVICE ALERT TOLL -FREE 1-800-422-4133 TIWO IYORKINIC DAYS BEFORE
YOU DIG
s,Y
SITE
APPROVED CHANGES
EARi if RK
THE CONSTRUCTION AREA IS UNDERLAIN BY //% 2OCU.MENTED
FILL SOILS OF VARIAf'L E DEPTH THE CONTRACTOR SHALL
REFER TO . TE GEOTEC/-NICAL INVEST/CATION REPORT AND
MAKE HIS OffNDE.TERMINATION OF THE AMOUNT OF REMOVAL
AND RECONSTRUCTION
APPROVED 8Y DATE
T,> 1FFIC HIV_ ROUTE
APPROVED
PLANNING:
APPROVED
D,4
EROSION CONTROL NOTES
1. THE GRADINC CONTRACTORSHALL BE RESPONSI £ FOR THE INSPECTION AND MODIFICATION OF THE EROSION CONTROL DE F.ICES, AS MCI-5MP; DURING THE RAINY SEASON. THE CONTRACTOR, PERMITL£E OR OMER SHALL BE RESPONSIBLE FOR THE CONTINUAL ;MAINTENANCE OF THE EROSION CONTROL DEVICES DURING' THE
RAINY SEASON IN THE EVENT OF FAILURE OR REFUSAL TO PROPERLY INTAIN
SAID DEVICES, THE CITY ENGINEER MAY CAUSE EMERGENCY MAINTENANCE /YORK TO BE DONE TO PROTECT ADJACENT PRIVATE AND PURL IC PROPERTY. THE COST (IN-
CLUDING AN INITIAL MOBILIZATION AMOUNT) OF /WHICH SHALL BE CHARGED TO THE DINER.
SEDIMENTATION BASINS MAY NOT BE REMOVED OR MADE INOPERATIVE IITHOUT
PRIOR APPROVAL FROM THE CITY ENGINEER
S TEMPORARY EROSION CONTROL DEVICES SHOW ON THE GRADING PLAN RICH INTER- FERE !WITH THE WORK SHALL BE RELOCATED OR MODIFIED AS THE !WORK PROGRESSES AS RECOMMENDED BY THE ENGINEER OF "YORK AS APPROVED BY THE CITY ENGINEER
4.' ALL LOOSE SOIL AND DEBRIS SHALL BE REMOVED FROM THE STREET AREAS UPON
STARTING OPERATIONS AND PERIODICALLY AFTER AS DIRECTED BY THE INSPECTOR
5. A 12 -INCH HIGH BY 4 -FOOT FIDE BERM SHALL BE MAINTAINED ALONG THE TOP OF SLOPE OF THOSE FILLS ON IYHICH GRADING IS NOT IN PROGRESS. CONCENTRATED_ WATER SHALL BE CARRIED NOT CLOSER THAN 10 -FEET FROM THE TOP OF SLOPES
6. ALL BUILDING PADS SHALL BE SLOPED TOIWARDS THE DRI VEfYAY AND VELOCITY CHECK DAMS PROVIDED AT THE BASE OF ALL DRIVE IMYS DRAINING INTO THE STREET.
VELOCITY CHECK DAMS SHALL BE PROVIDED ACROSS The OUTLETS OF ALL LOTS
DRAINING INTO THE STREET
STANDBY CA'[#3 SHALL BE ALERTED BY THE CONTRACTOR, _ PERMI TTEE, OR OWNER FOR EMERGENCY !YORK DURING RAINSTORMS -
8 ALL- UTILITY TRENCHES SHALL BE BACKFILLED /WITHIN 24 HOURS AND MUST BE BACKFILLED BEFORE THE END OF THE fYORKDAY If 40 :PERCENT CHANCE OF RAIN IS PREDICTED.
PROVIDE VELOCITY CHECK DAMS IN ALL STREET AREAS PAVED OR UNPAVED AT THE INTERVALS INDICATED BEL OIY. VELOCITY CHECK DAMS MAY 8E CONSTRUCTED OF
SANDBAGS TIMBER OR OTHER EROSION RESISTANT MATERIALS APPROVED BY THE
CITY ENGINEER, AND SHALL EXTEND COMPLETELY ACROSS THE STREET OR CHANNEL AT RIGHT ANGLES TO THE CENTER 1 ONE. EARTH DIKES MAY NOT BE USED AS
VELOCITY CHECK DAMS
GRADE OF THE STREET INTERVAL
LESS THAN2I
21TO41
41 TO 10.8'
OVER 101
AS REQUIRED
100 FEET
50 FEET
25 FEET
10. PROVIDE VELOCITY CHECK DAMS' IN ALL UNPAVED GRADED CHANNELS AT .THE INTER- VALS INDICATED BEL Of UNLESS CHANNELS ARE LINED WITH TEMPORARY MATERIALS SUCH AS PLASTIC SHEETING:
GRADE OF CHANNEL INTERVAL
LESS THAN
3% TO 6,8'
OVER 6%
AS REQUIRED
50 FEET
25 FEET
11. A SANDBAG SILT BASIN OR TRAP SHALL BE PROVIDED AT EVERY STORM DRAIN INLET TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN SYSTEM. 12 A GUARD SHALL BE POSTED ON SITE !WHENEVER THE DEPTH OF WATER IN ANY DEVICES EXCEEDS 2 FEET
ALL REMOVABLE PROTECTION DEVICES SHOIN SHALL BE IN PLACE Al- THE END OF EACH ffORKING DAY IYHEN THE 5 -DAY RAIN PROBABILITY FORECAST EXCEED 40 - PERCENT AFTER EACH RAINSTORM EXCEEDING 1/4 INCH IN A 12 -HOUR PERIOD, SILT AND DEBRIS SHALL BE REMOVED FROM CHECK DAMS AND DESIL TL4C BASINS, AND SHALL BE PUMPED DRY.
14 EFFECTIVE PLANTING SHALL BE INSTALLED FULLY GERMINATED AND SHALL EFFECTIVELY COVER THE REQUIRED SLOPES PRIOR TO FINAL APP/?0V/IL. THE PANTING iex SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO :INSTALL- ATION SPRINKLER SYSTEMS ARE REQUIRED ON ALL SLOPES OVER FIVE. FEET IN
HEIGHT TEMPORARY SPRINKLER SYSTEMS JYJLL BE REQUIRED ON ALL SLOPES UNTIL
PLANTING IS ESTABLISHED AND MAY NOT BE REMOVED /WITHOUT PRIOR APPROVAL
FROM THE CITY ENGINEER
15 SANDBAGS AND NECESSARY MATERIALS SHALL Bf AVAILABLE ON SITE AND STOCK-
PILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES OR TO .REPAIR ANY DAMAGED EROSION CONTROL MEASURES (WHEN RAIN IS IMI1INENT. A STANDBY C•'Ef SHALL 8E MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON.
18 ,ANY PROPOSED ALTERNATE CONTROL MEASURES ARE TO BE RECOMMENED BY THE
ENGINEER OF /YORK FOR APPROVAL BY THE CITY ENGINEER PRIOR TO INSTALL- ATION
1i GRADING CONTRACTOR SHALL PROVIDE A 24HOUR TELEPHONE NUMBER AND THE NAME (S) OF THE PERSON (S) RESPONSIBLE FOR EMERGE/VI /WORK. A 'TELEPHONE ANSSYERING MACHINE .TS UNACCEPTABLE
NAME. 24 HOUR PHONE
NDBAG PE' ;IMETER
STATEMENT. OF ENGINEER' OF •WORK
The undersigned engineer agrees that the. work performed by the engineer shall comply with the generally occe.pted standards and practices of the eng'ineer's trade or profession. The. engineer further agrees that the work performed herein shall be, in accordance with the rules and regulations required by the -.•City of Vista. The .engineer agrees that any plon check or review performed by the Cify of vista in its capacity os a public entity • for the plans prepared by the engineer •is nat a determination by the .City of Vista of th'e technical sufficiency or adequacy of the plans or design and, therefore does not relieve the engineer .of• responsibility` for the plans or design of improvements based thereon.
T.he engineer agrees to indemnify and hold harmless the 'City of Vista,` -is officers, agents and employees trorn property damage or 'bodily injury cu -sing solely, from the negligent acts, errors or .omissionk, of the .engineer, its ogents •or its employees; acting within the course and scope or such agency and employment, and arising out of the work performed by the engineer.
RONALD M.
LUTTIO
No. 20303
CIVIL i•
EXP.
ENGINEER
PLANS PREPARED BY
RON,4 O A LUTTIO
CONSULTING" CIVIL ENGINEER
2147 LfUNDY LAKE DRIVE
SCONCIDO CA 92029
619) 745-1409
EXP. LIC. DATE DATE
12.1kiNS.1 ON AS ,S/701111,1
ON` PLAN
REMTIOY.
I27 OCITY C/IECIK DAY
DRAIN A.> StiCtf'N ON PL
SOBEN7- BASIN
NTS
1 2 SANDBAG
HEIGHT
SANDBAGS -- 3 ROTS HIGH
f-
N, TS
SECTIONFF
N T..S.
AD
CITY OF VISTA
PRECISE 6R4DING PLAN FOR•
cur OF 1VIST,4 IMSTEPI TER
SERVICE BI.JILDDINC'
APPROVED
CITY ',ENGINEEf2 `W"'+-.-- RCE
BENCH MARK LEAD & CONCRETE NAIL .4T 6E6INNING OF CURB :RETURN PV
SOUTH CURB OF TAYLOR STREET AT SDUTHIEEST CORNER
EXP. LIC, DATE DATE
OF BON41R ROAD. Cr 882--0025
ELEVATION 555. 369 DATUAt I1SL
P.C.
SHEET .1 OF 2r
DRAWING. t'iO.
GP.>
J1
o
11/10/2026 C6 163 of 357
ienixwnra...emixte
miszso.ovaxz msxa*etaivzs+
aagttaa
muziva sm rwxxaraKa rswy.s2rP3.M r.
30.42 r 5.
f: 5,3O 7th
N
rE'... TREN4 H.._i: -
ET , !T.
f
E<L, UG. _INC.
API i; I 'i i 1, .. ._.. t
BUILDING 5LAr3 AND PAVEMENT R5CONS TPUC T/ON
ADDIT/VE AL TFRNA TE NO. 2
CON5- r'T T ' A.C. PAVEMENT ON BASE
I PER P —VALUE Tf5T
C 7N5 TRUC T CONCRETE PA 3/FMtNT
ire R --VALVE TEST
10,
wmazee.s + NI INIMOdeauan uponuIMWAS. zs NEMISMIIMION ket.....41M13.9301064.4MTNIM
DESCRIPTION
APPROVED CHANGES
APPROVED BI DATE
z
ENGINEER
YIS 1NG
STREET LIGHT
XIS,T
T `L1GAT
RCE; EXP. LIC. DATE DATE
I
r_•w a=.m. ravu4su1.1,11 ...9001601¢.05.1.1•Flureatall
r i
F/<°
STATEMENT OF ENGINEER OF WORK
m9rsx:.a,ae, ..nxrsr- ,.....-... , •..au a'ar`aes:«z+'r ue SCALE I" = 20'
inrig gigsgassemiwimanni
G 10 20 40
j
e . -
VI-I i NT L_1 .
i i I,^m
SCHEDULE •B
BENEFIT LAND TITLE INSURANCE CD,
I?DC, # 9739728:20 D.R,, DEC,30, 1995
ITEM DESCRIPTION
2. V.I.D. PIPELINE, LOCATION NOT DISCLOSED
REC. OCT. 6, 1925 BOOK 1125, PAGE 195 IR,
5. V.I,D.IASEMENT OVER WHOLE SITE.
REC. DEC. 12, 1940 BOOK 115, PAGE 109 O.R.
11. • ROAD EASEMENT
REC. #73--087593 APR. 4,1973 G.R.
21, SDG&CE EASEMENT
REC. #78--306677 JUL. 21,1978
22. SEE ITEM 21
The undersigned engineer agrees that the work performed by the engineer shall comply with the generally accepted standards and practices of the engineer's trade or profession. The- engineer further agrees that the work performed herein shall be in accordance with the rules and reguiations required by the City of Vista. The engineer agrees that any plan check or review performed by the City of Vista in Its capacity . as a public entity for the plans prepared by The engineer is not a determination by the City of Vista of the technical sufficiency or adequacy of the plans or design and, therefore does not relieve the engineer of responsibility for the piens or design of Improvements based thereon.
The engineer agrees to indemnify and hold harmless the City of Vista, its officers, agents and employees from property damage or bodily Injury arising solely from the negligent acts, errors or omissions of the engineer, Its agerde .or Its employees, acting within the course and scope or such agency and employment, and arising out of the work performed by the engineer.
F[ /}edS f EPARFD B: '
RONALD Ai! L (11710
CONS('. TIN CIVIL £N'INCER
2117 LUN1?l LAKE- DRIVE
ESCONDIDO, CAL IFORNI.4 .9202.9
750 745-1109
ENGINEER RCE: 20303 EXP. 9-30
IMICIMMENIMINNIIIMIIIIIIMINIMINEll
RONALD M.
LUTTI 0
No. 20303
ova_EXP.
171
GC?",7
E4 EN
smmerrxa asr.vzasx-r3asamrdnsae aak+^-+w^wwrar:asam wuzaamxxausmedrwars9r.,nua:rFs JP(O VISTA.
GRAD/NC PLAN FOR:
W5 TA WA 5 7feWA TEAA `G 511119,A6
iC
APPROVED
1111 CITY ENGINEER RCE EXP. LIC. DATE DATE
BENCH MARK LEAP ANL) CCNCRf7i NAIL AT 13E611006 OF CURB RETIRIv IN .SDUTN CURB Of T4YWR 5 TRITAT 5LXI7i'r'E5T
COR'NfR OF BONAIR R©AD. CV 82-0025 r
r-
SHEET .2_0F L
r -
DRAWING O.
fLfVAT?ONN ,555304 PATO''', • I<i61.
11/10/2026 C6 164 of 357
R T. !TAIL.3/4"
ADD ALT.
NO.2
EXISTING STORAesr 514ELTER TO T.3n REMO`v'ED1'N
NEW FLAG POLE REF TO PE.TAIL G -
REMOVE EXISTING AG PAVING 4 IMST ALL. NEIN" AG f'.r . Vll .
EXISTING SLIDING CHAN-INK GATE.
0 EXISTING STORAGE SHEDS TO REMAIN.
0 EXISTING RETAINING WALL.
OEXISTING GM.) FREE STANDING WALLS TO BE REMOVED.MIG)
0 LINE OF EXISTING BUILDING TO BE REMOVED.
OEXISTING STORAGE SHELTERS TO BE REMOVED.(NIG)
I j EXISTING RAISED GONG. PATIO TO BE REMOVED.
OEXISTING RETAINING WALL TO BE REMOVED.MIG)
C) NEW Gt t) RETAINING WALL PER
OEXISTING GONG. PAVING TO BE REMOVED. INSTALL NEW GONG. PAVING PER STRUGT.
14 EXISTING GONG.GURBS TO BE RE.NIOVEID.
15 EXISTING GONG. SWALE.
16 REMOVE EXISTING TIRE STORAGE BUILDINFs. REFER TO
T EXISTING LIGHT PULE 4 BASE FOOTING TO BE REMOVED% IIG) 1$ REMOVE EXISTING AG PAVING.
O EXISTING PARKING.
c) PATCH AND REPAIR EXISTING AG PAVIN&.(NIG)
0 10 20 40
SCALE: 1" = 20'
RUHNAU •RUHNAUASSOCIATES
575! Palmer Way, Suite C
Carlsbad CA. 92i0i&8872
61914.385899
FAX: 6 1 9 1 93 1-81 94
3775 Tenth Street
Riverside, Gt 92501-3669
909 / 684-4664
FAX: 909/ 684-6276
1 AS _ EVA ER SE VIC S SUIL N
CITY OF VISTA
VISTA, CALIFORNIA
FAR I AL SITE FLAN
11/10/2026 C6 165 of 357
FLAGPOLE
1 5-0.56VARE
G,'-6• R0L*4
I` MIK A4YKANT
TO Mk 6100E
I. BALL
2. TRUCK
5. FiA5HIN6 COLLAR
4. CAUXIN6G
5. - WATERPROOF CEMENT
T. 6Tes. 51.FPIE
5. WEEDED DRY SAND
4. 5Tf- - REDOES
O. $TEE1. PLATE
II. CONCRETE FOOTING,
12. 5/4.06 STEEL
LIGHT11N6 645:7UND
SPICE
13. FINISH GRADE
OR PAWN.
14. +45 VERT. • 5'4'
52UARE FOOT1N61
6-45 VERT. • 5.6'
ramp FOOITN6
IS. 14. TE.S 6.12` OL..,
SLOPE I• PER FOOT6.
H.b•
25'4'-0'
4'-6'
55'
4O 5'LO'
NEW AG
PAVING
A
Il 61-2"
N
I,I •
II/4" I.D. GALV.
STL. GUARDRAIL
4 @ IS"
O.G. EA 1AIAY
71! I 1-6'
r
I I'-6"
COMPACTED
FILL
028008
r
15H
OU'ND TROWEL TOP
DIA. STD. STEEL
PIPE/ GROUT SOLI;:
FLUSH PAVING
WHERE OCCURS
SLOPE I" PER FOOT
r- II" MIN. ADJACENT
TO FINISH GRADE
FINISH GRADE
WHERE OCCURS
IS" DIA. GONG. FOOTING
fi
2n. `
O
5" % PIPE
UGUARD POST
SAGE OF
DOOR JAMB -
DOOR
PER PLANS
028009
7,U FACE
WHERE OCCURS
O
343 PIPE GUARD
POST, TYPICAL - - 0
FIRE HYDRANT OR
UTILITY PIPING
0 AT FIRE HYDRANTS OR UTILITY PIPING
2,-6"
EXTERIOR FACE
r/ OF WALL
d
U
AT DOORWAYS
8"%PIPE
GUARD POST
EXTR. FACE
OF WALL
AT WALL CORNERS
NOTES:
I. PROVIDE PIPE GUARDS WHERE INDICATED ON PLANS.
2. SEE PIPE GUARD POST DETAIL(5) FOR POST CONSTRUCTION.
NTS 1 RAMP SECTION I/2"3 F I PE GUAR.O POST 4 TYPICAL PIPE GUARD LAYOUT NTS NOTE:
REFER TO DETAIL 17
THIS SHT. FOR ADD'L INFO.
GUARDRAIL BEYOND
II/4." I.D. GALV.
STL. HANDRAIL
SANDBLAST FINISH
RAMP ELEVATION 1/4"7
5"4'-4"
UP
m
GONG. STAIR FLAN II/41'.:11-0'8
32'
5"4'-10
UP
5'_6,1 21'2"
RAMP DN 1:12
12 J2"
1 D5 Ds
2x4 BLOCK
OUT -
elm
7 1 _
12"
RAMP FLAN I/4°-1'-10
CAST IRON PIPE
I" LARGER THAN
DOWNSPOUT TO
STORM DRAINAGE
SYSTEM
SEALANT INSTALL
SO WATER SHEDS
TOOLED EDGE
CONCRETE PAVING
O INSI`'OUT TRANSITION 11
N) EXPANSION JOINT
FILLER
1/2" PREMOLDED
JOINT FILLER _
SEALANT
SLOPE PER
SITE PLAN
3 BARS AT IS" O.G.
EACH WAY CENTER IN SLAB TYP.
V
61'.I #4 CONT. BARS TOP 4
RAMP TO LAND ING
SLOPE PER
SITE PLAN
025010
BOTTOM TYP.
F-1/2" PREMOLDEP
JOINT F I LLERW/SEALANT
NEW AG
PAVING
r
6"RAMP SOOT
3" DIA. x 5" PIPE
SLEEVE W/ #3 HAIRPIN
TACK WELDED TO SLEEVE
IS"
R
3 HAIRPLN
PER
FIN.
ELEV5 CONC. PAVING
WHERE OCCURS W/
61I
4 DOWELS I
IS" O.G. --- 24"
tY
PLAN YIEr4
2„
2'-0" _
CONCRETE
SPLASH BLOCK
R 4
SECTION
iV
5 II
GONG. RAMP SOOT !TA I L
n
m
0 2" CLEAR
TYP)
HANDRAIL
LAY —OUT
PER PLAN
ADJACENT WALL WHERE OCCURS
5'—O" MAX. 5'-O" MAX.
EQUAL)
ELEVATION © STAIRS
2" / 5'-O" MAX.
EDGE OF -
LANDING
EQUAL)
I-I/4" ID. GALV. STL. PIPE
WELD ALL CONNECTIONS
GROUND SMOOTH ALL
JOINTS, TYP.
055003 ELEVATION © RAMPS
4„ I SEE PLAN.
I C
12 MAX.
I 5'-0" MAX.
EQUAL)
I -I/2"
T+I2"
5'-O" MAX.
5-O" MAX.
EQUAL)
NOTE: SEE PLAN FOR HANDRAIL
LOCATIONS.
12 EDGE OF
RAMP
q-
GOMPAGTED FILL
I-1/4" I.D. GALV. PIPE POSTS PER
HANDRAIL VET. SET W/ NON -SHRINK
4" GROUT INSTAL l FP CONVEX
4" THK. CONCRETE SLAB WITH
3 BARS @ 18" O.C. EACH WAY --
3" CLR.
2'-O"
6"
10"
4 BARS @ 12" O.C.
MAX.) HORIZ. 4 VERT.
7Z
3/16"
TOOLED JOINT (T.J.)
I/4" RADIUS
NEAKENED PLANE
JOINT (MP . OR G.J.)
PROVIDE ® I5' -O" 0/CMAX.
EXPANSION JOINT (E.J.)
PROVIDE © 60'-0" O/C. MAX.
3/16"
1/4 SLAB
DEPTH
3/16"
EXPANSION JOINT
FILLER MATERIAL
I I
f
TYP.
IL
41 MEDIUM BROOM
IN/ 2" SHINER
SURROUND, TYP.
LINE UP BROOM
PATTERN W/
PAVING JOINTS
iA I S GONG . SL.A 3 EDGE
2" MIN. WIDE PAINTED WARNING
STRIPE @ EA. TREAD 4 TOP
LANDING, CONTRASTING COLOR,
1" MAX. FROM NOSING
SLOPE HANDRAIL TO
MATCH STAIR SLOPE
SEE PLANS FOR
STAIR DIMENSIONS)
TYP. STAIR
055004
CONC. INTEGRAL TO STAIR
rOR POST ANCHORAGE,
WHERE NO ADJACENT CONC.
SLAB OCCURS
11 13
I-1/4" ID. GALV. STL. PIPE
WELD ALL CONNECTIONS
GRIND SMOOTH, ALL
JOINTS, TYP.
RAISED CURB
WHERE OCCURS
CONCRETE JOINT L,E TA I LS
5EE
PLANS
SEE PLANS
CONC. SLAB
WHERE OCCURS
COLD
JOINT
STAIR SECTION
4r3 NOSING
DOWEL INTO
SIDE WALLS
WHERE OCCURS
2" CLEAR
REFER TO DETAIL
FOR MORE INFO.
14 TYPICAL NOSING
GONG. SPLASH 5LOGK I 1/2"16 PIPE fAN1,R'AIL.S 1/4"17 STAIR ANI,RAIL 1/2"ONC-RETE STAIRS 19 15 5751 Palmer Way, Suite C
Carlsbad, CA 92008-8872
760 /438-5899
FAX: 760 / 931-8194
3775 Tenth Street
Riverside, CA 92501-3669
9O9/684-4664
FAX: 909 / 684-6276
frMA57.-711NATER SERV ICES E3ulLr;IN
CIT`r ,C) VISTA
VISTA, GALIFORNIA
SITE r, LS
11/10/2026 C6 166 of 357
MEETIi t6
i
OFFICE
HALL
f
TftlNlt*!G
49 ADMIN.
CHAIR
12 RECEIPT 73
M. LOCKERS
21 SASE. 51 - ADM I N 1 STSAT I ON SU I L.D I NG FLOOR FLAN I
I
ADD ALTERNATE No. 2 - 5U I LrD I NG 5
ADD ALTERNATE No.
eD
n
07/
to
PP - Pct G7 L - 4 7$ MA1-4
2 z ff I-©Gss."T"' ICS 4 3
12_4
CONCRETE FOUNDATION.
15 A PART OF Am). . ALT. *2
PRE- MANUFAc. BUILDING
SHALL BE FU - FER TO
STRUCTURAL
4,:& -41
dr
I
KEG NOSE
I. REFR6ERATOR •(NI
2. FOLDING PARTIT,IOk .
5. PRE-MANUFACTUR 2E3
4. OVERHEAD CABINET RE]r'ER ;0 N`7 RI0R ELEVATIONS
5. H1/LO WATERCOOL LUM51NG ANL7 DETAIL 16/A15
6, RANGE AND MICRO. A
1. VENDING MAO -TINE (N1'4
6. WASHING MACHINE (NIL}
GI. DRYER (NIG)
Y "
O. WATER HEATER REFER TO MECHANICAL
t
H. PIPE BOLLARD REFER TO DETAIL 4/AI.1 .
12. FRAME WALL FOR FUTURE DOOR OPENING
IS. NEW 2x6 5TUD WALL REFER TO STRUCTURAL
14. FUTURE LOCKERS. CONTRACTOR TO PROVIDE BACKING A5 REQUIRED 15, HANDICAPPED FIBERGLASS SHOWER BY MASON d ASSOCIATES t4S445O/' OR EQUAL. REFER TO SPECIFICATIONS.
S VSO .;
0 liNALL L.. END
c. !I
2o'GA. GALV. G STUDS ® I6" O.C.
WITH R -I3 INSULATION•
6"x16 GA. GALV. C STUDS @ 16" O.C.
EXTEND STUDS 6" ABOVE
ADJACENT CEILING
6"x2O GA. METAL STUDS @ 16" O.C.
EXTEND TO UNDERSIDE OF ROOF
STRUCTURE
1x20 GA.
0 "x2o GA., METAL STUDS 16" ©.C
EXTEND STUDS 6" A
ADJACENT CEILING
C.‘01 -0 44. /A5-
A crs / Planners L'OOR FLANr %y
i eeked by RUHM4U • RUHNAU ASSOCIATES
5751 Palmer Way, Since C
CarNsa, CA 92(4!18+8872
619 /438.5899
FNC 619/931.8194
3775 Terms Street
Rlverskle CA 92501-3669
909/684-4664
FAX 909/684-6276
iAiASTEfrNATER SERVICES 5U I LD I NG
CITY OF VISTA
VISTA, CAI IFORNIA
A2
11/10/2026 C6 167 of 357
A ALTERNATE No. I RE LECT! G I L L NG FLAN
36" HORIZONTAL GRAB BAR
48" HORIZONTAL GRAB BAR
SURFACE MOUNTED TOILET TISSUE CABINET
SEMI— REeESc..--)ED PAPER TOWEL DISPENSER
SURFACE MOUNTED LIQUID SOAP DISPENSER
SURFACE MOUNTED TOILET SEAT COVER DISPENSER
Q SURFACE MOUNTED 24"x6O" STAINLESS STEEL MIRROR
ID SURFACE MOUNTED I8"x3O" FRAMED MIRROR
C., SURFACE MOUNTED NAPKIN TAMPON VENDOR
SURFACE MOUNTED NAPKIN DISPOSAL
RUHNAU • RUHNAU ASSOCIATES
Art theca / Planners
5751 Palmer Way, Sure C
Carlsbad, GA. 92008.8872
619 /438-5899
FAX 619/931-8194
3775 Tenth Street
Riverside, CA. 92501-3669
909 /684-4664
FAX 909 / 684-6276
PLAN. DETAIL
PLAN DETAIL
PLAN DETAIL'
WASTEWATER SEi@VJ S E3U 1LD I NCB
CITY OF VISTA
VISTA/ CALIFORNIA
2X4 SU
NOTFC-
T A -IS FOR DETAILS.
PRE-ENGINEERED STRJ T. GOL.
ENGINEERED BUILDING ',MALL
GREEN BOARD.
FIBERGLASS REINFORCED PANEL.
6"X2O GA METAL STUDS:
SUSPENDED GYP BD CEILING. REF TO SHEET A -I3 FOR
H.G. DATER CLOSET.
WATER CLOSET
HANDICAP URINAL
URINAL
GYP BD OVER 6" MTL. CEILING JOISTS @ 24" Q C.
t \ 1
I ACCESS PANEL
SUPPLY DIFFUSER
0 RETURN AIR GRILLE
0 EXHAUST REGISTER
r-7-1 IX4 LIGHT FIXTURE
2X4 LIGHT FIXTURE
Q ViALL MOUNTED FIXTURE
r r + STRIP LIGHT FIXTURE
O RECESSED LIGHT FIXTURE
c=t1==1 __ CONT. LIGHTING
SYMBOLS LEGEND
REF..ECTE17) C-EI,IN& FLAN
A3
11/10/2026 C6 168 of 357
Drown by
Checked by
Revisions
it)
i i
4 t
1 j
r
t
V
1. t
t
Q
r
t
S
t j 1
t
3 1
r
i
r
f
It
t
i
P
x
t
t
r
t
ii
s
s
ROOF FLAN BLS7G. B (N1c
STIN RO ALA\
RUMNA J .RUHNAUASSOCMTES
NctitraNIP1anners
5751 Padner VVay, Suite C
Carlsbact CA 9200848872
619 / 438.5899
FAX 619/931.819f
3775 Tenth Street
R esrde CA 92501-3669
909/694.4664
FAX- 909/694-6276
YNAS'E 4IATER SERVICES
CITY O VISTA
VISTA, GALIORNIA
KEY `\OTS
NE'OF FUTURE BUILPIN6
NINSPOUT BY BUULDIN6 MANUF.
EXHAUST FAN REFER TO MECHANICAL FOR SIZE 4 NIT.
STRUCTURAL SUPPORT SHALL 3E P1 NEP BY BLP6. MANUF.
4. ROOF PANEL
5, HVAG UNIT REFER TO MECHANICAL FOR SIZE 4 WT.
STRUCTURAL SUPPORT SHALL BE PISSNED BY BLL76. MANUF.
6. SPUTTER
1, EXISTING BUILT-UP ROOF
8. PATCH t REPAIR EXISTING BUILT-UP ROOFING AS REG.
9. METAL PARAPET COPING
ROOF FLAN
X
SCALE: 1 /8" =1 ' --0"
A4
11/10/2026 C6 169 of 357
FUTUR GARAGE CONSTRUCTION
T T
rB
1 II
r
NORTH ELPVATION
r•"
i_
1 ST ELEVATIO
NEIN ON TRU TION
SOUTH ELEVATION
1 2
I -
EAST ELEVATION
L
FUTURE GARAGE
FUTUi
tiN
NORTH ELEV.FUTURE GARAGE i'EST eLev.
SECTION
SUTURE GARAGE soutH eLev.
STORAGE ARAG.
9 fig TK .
13,6
I. OOIMNSPOUT BY WILDING
2. ALUM. SLIDING WINDOW
5. PIPE BOLLARD REFER TO DETAIL. 4/ALI
4. HADICAPPED CONCRETE RAMP REF. TO pe-r. 1/AI.I
5. ROOF PANEL
Es. iNALL PANEL
1. LIGHT FIXTURE REFER TO ELECTRICAL
8. PURL IN
41. STRUCTURAL .COL. BEYOND
IO. METAL DOOR
S! C T I O -N
0 4 8 1E
SCALE:. 1 /8" = 1 '-0"
SO ARCA/
vQ q
No, C-20662
P Cxp. 3-31-97
CALF/
fro hY
i 7 {_ (: i\ Y_' d
Revis!orJs
Architects /Manners
RUMNAt1 •RUHNAUASSOCWES
5751 Palmer Way, Suite C
Carlsbad, CA. 920088872
619/ 438-5899
FAX 6191931-8194
3775 Tenth Stre
Rtrerstde G. 92501-3669
909/684.46564
FAX 909/684-6276
I ASTE AT!R SERVICES 5U I L I NG
CI T'1' OF VISTA
VISTA, CALIFORNIA
EXTERIOR ELEVATIONS/
3U I Lr,I NG SECTIONS
11/10/2026 C6 170 of 357
N) 5/8" GYP BD.
OVER "1/8" THICK
PLASTER
2,1020\9A6
FIRE BLOCKING
CUSTODIAN
MECHANICAL
CORRIDORS .
STORAGE
EXISTING INTERIOR.
PARTITIONPER
UBG TABLE 'TI'3 I5 -I.2
HOUR \1: L O a
5/e" TYP
GYP. jh
EXISTI\EiAs
KIN6 AS RECZ'D BY
IRE R TANr C•1
BLDG: MATERIALS
ER TO SECTION 01210
STOPPING.
PIPE (BARE)
FIRE
RATED WALL
PIPE (INSULATED)
PIP CO I I ' 1 EI TRATION
THRU RATED WALL
MALL SECTION•.
@f _
o
3 MALL SECTION
I
TES (,
1. ROOF PANL"l,
2. PURLIN
3. WALL PANEL
4. Me -ENGINEERED BUILDING NALL INSULATION
5. PRE-EN6INEERM BUILDING ROOF INSULATION
6. GIRT H
1. Ill)* PORTLAND CEMENT PLASTER
S. 6" METAL STUDS AT 16' O.G.
4. r211 BATT INSULATION, UNPAGED
10. WALL FINISH PER ROOM FINISH SCHEDULE
II. CEILING FINISH PER ROOM .FINISH SCHEDULE
12. 'HIGH CONCRETE CURB
13. FLOOR SHEATHING
14. 1 rittitiO r',06e4144e, '` w V ` 4
15. 5/5" TYPE 'X' 6N13 IN I -HR A55Y PER USG TABLE 43•B,
16. 11,& 7,11irp
II. PIPE GUARD POST PER 16/A52
IS. GUTTER
14. 4" • DOYSPOUT
20. RAKE TRIM
21. . .?-1,1,11-46-b ALUMINUM WINDOW Yi/SCREEN
22. STEEL DOOR
23. ELECTRICAL MAIN SWITCHBOARD
00.0 ee.t Alt Mir° I °`
Veer w
erriMrff
H10
M r,W pyhoj
Fg2 \m r1
f,
y,16,1, FN&
SCALE: 1 /8" =1 '-0'
Drown b
Checked by
bui z e
lttl`'iS'FtOt IV.).
l-evrsigns
Atrhitects Planners
l AST FIAT R SERVICES 5U I LI,I N
C I TY O VISTA
VISTA/ CAL I O N I A
ALL SE TI ON r, •1,
A6
f };,.- -,
RurIwu •RUHNAJASSOCIATES
5751 F' noact, C
C 3775 Tenth
925Ca.Gl92pOBfi872 4Ph+9/l68 6925Dh3669619/4385899 9C)<l / 689 ".664 FA?C619/931-8194 FAX 90)9/684.62'76
11/10/2026 C6 171 of 357
Drawn. by
Checked h4
Date
Commission No.
Revisions
UTH-t W ea
Nom -T.1 -s 7A
104 HALLWAY
yt •
32'
106 CREW
RUHNAU •R *NAI/ASSOCIATES
3775 Teter SSeet
Rheside CA 92501-3669
909 /684-4664
FAX 909/684.6276
ASTE ATER S!R Y I CES
CITY OF VISTA
VISTA, CALIFORNIA
KAY NOTES
4" RUBBER TOP -SET BASE REFER TO DETAIL 6/Al4
2. PLASTIC LAMINATE GAP REFER TO DETAIL I/A1O
5. 4" PLASTIC, LAMINATE SPLASH
4.. PLASTIC. LAMINATE COUNTER TOP
5. PAINT OVER fie" GYP BOARD. 5EE FINISH SCHEDULE
6, STANTION FOOTING. REFER TO DETAIL
1. FRP OVER " GREEN BOARD. FULL HEIGHT
5. WATER COOLER DRINKING FOUNTAIN. REFER'TO DETAIL 11/A15 q. FRAME OUT DOOR FOR FUTURE OPENING
IO. METALPARTITION I"4/ BAKED ENAMEL FINISH
II. WATER CLOSET. REFER TO PLUMBING
12. HANDICAPPED URINAL. REFER TO DETAIL 4/All
15. HANDICAPPED WATER CLOSET REFER TO DETAIL 5/All
14. FUTURE LOCKERS. CONTRACTOR TO PROVIDE BACKING AS REQUIRED
15. HANDICAPPED FIBERGLASS SHOWER BY MARCH # ASSOCIATES HS4450/T-24.
OR EQUAL. REFER TO SPECIFICATIONS.
16. METAL STUD BLOCKING
17. HINGED MAPS SELECTED BY OWNER
IS. 72"x46" MARKER BOARD
Iq. '72"x45" TACK BOARD
20. VENDING MACHINE (NIC)
21. MICROWAVE (NIG)
22. REFRIGERATOR (NIC)
25. FUTURE CUBBYHOLES. CONTRACTOR TO PROVIDE BACKING A5 REQUIRED
24. ALTERNATE I: FOLDING PARTITION POCKET
25. ALTERNATE I: CLOSETS. REFER TO FLOOR PLAN
26. PLASTIC LAMINATE OVER 4" PLYWOOD WITH EASED EDGES.
27. s/a° GYP BOARD OVER 6" METAL STUDS @ 16" O.K.
25. FRY "F" MOLD. PAINT BLACK
SCALE: 1 /4" =1 -0"
INTERIOR ELEVATIONS
t
11/10/2026 C6 172 of 357
Y NOTE=c-
7 f
SOUTH
109 WOMEN
T .TH.
111 MEN
A.
MAST
NORTH
112.. HENS LOCKER ROOM
NO TH A T
110 WOMENS LOCKER ROOM
10)
50u-rH
AT
vi
12 SOUTH
1 7 FP
NOKT
109 WOMEN
Co
isely
SCUT h
EAST
rr
1 11 OA,112A SHOWER
FRP
1 FIJ
WEST
a
4" RUBBER TOP —SET BASE- R TO DETAIL 6/A14
PLASTIC LAMINATE CAP R "`Y ER TO DETAIL I/A(O
5. 4" PLASTIC LAMINATE SPLASH
4. PLASTIC LAMINATE COUNTER TOP
5. PAINT OVER Nb" GYP BOAR7. SEE FINISH SCHEDULE
6. STANT1ON FOOTING. REFER TO DETAIL
7. FRP OVER %" GREEN BOARD. FULL HEIGHT
8. WATER 4i0OLER DRINKING FOUNTAIN. REFER TO DETAIL 11/AI5
4. FRAME OUT DOOR FOR FUTURE OPENING
10. METAL PARTITION W/ BAKED ENAMEL FINISH
II. WATER CLOSET. REFER TO PLUMBING
12. HANDICAPPED URINAL. REFER TO DETAIL 4/All
15. HANDICAPPED WATER CLOSET REFER TO DETAIL 5/All
14. FUTURE LOCKERS. CONTRACTOR TO PROVIDE BACKING AS REG2UIRED I5. HANDICAPPED FIBERGLASS SHOWER E'( MARON 4 ASSOCIATES HS4450/T-24.
OR EQUAL. REFER TO SPECIFICATIONS.
I6. METAL STUD BLOCKING
1"1. HINGED MAPS SELECTED BY OWNER
18. 12"x48" MARKER BOARD
IW. 72"x48" TACK BOARD
20. VENDING MACHINE (NIC)
21. MICROWAVE (NIG)
22.. REFRIGERATOR (NIC)
2S. FUTURE CUBBYHOLES. CONTRACTOR. TO PROVIDE BACKING AS REQUIRED.
24. ALTERNATE I: FOLDING PARTITION POCKET
25. ALTERNATE 1: CLOSETS. REFER TO FLOOR PLAN
26. PLASTIC LAMINATE OVER 54" PLYWOOD WITH EASED EDGES.
21. N5" GYP BOARD OVER 6" METAL STUDS @ I6" O.K.
28. FRY "F" MOLD. PAINT BLACK
0 4 8
SCALE: 1 /4" =1 '
Prawn- t -'v
Ch.. .
Coi7tmissio ,, • NCB,
visions Architects /fttnners
AASTEIAIATER SERVICES 5U I L.t,I N
G I TY OF VISTA
VISTA, CALIFORNIA
INTERIOR ELEVATIONS
t->er
A9Rest •RUHNAUASSOcwTES
5Dote.C 3775 T ,
4C,8910U8t3872 /Y6CA925013669Carlsbad,
6t9/bt9/43&5899 909/6844664
FAX 619/ 931-8194 FAX: 909/684-627611/10/2026 C6 173 of 357
1,7
at1- 142-'
4)'r
30 2.
NORTH
BTU i
SEE INT. ELEV,
I-.I'/1.I .
ACCESS HOLE. 2-I/2"4" W/
WHET
Ix4 0 EA. SIDE OF VERTICAL
SUPPORT
4" RUBBER BASE I/4"
I TEF
REF.; pAIL
NTS
1. 4" RUBBER TOP -SET BASE REFER TO DETAIL 6/A14
PLASTIC, LAMINATE CAP REFER To, DETAIL I/A1O
5. 4" PLASTIC LAMINATE SPLASH
4. PLASTIC LAMINATE COUNTER TOP
5, PAINT OVER 5`6" GYP BOARD. SEE FINISH SCHEDULE
6. STANTION FOOTING. REFER TO DETAIL
i. FRP OVER fig" GREEN BOARD. FULL HEIGHT
WATER COOLER DRINKING FOUNTAIN. REFER TO DETAIL 11/A15
FRAMt OUT DOOR FOR FUTURE OPENING
10. METAL PARTITION WC BAKED ENAMEL FINISH
II. WATER CLOSET. REFER TO PLUMBING
12. HANDICAPPED URINAL. REFER TO DETAIL 4/All
13. HANDICAPPED WATER CLOSET REFER TO DETAIL 5/AII
14. FUTURE LOCKERS. CONTRACTOR TO PROVIDE BACKING A5 REQUIRED IS. HANDICAPPED FIBERGLASS SHOWER BY MASON t ASSOCIATES H54450/T-24.
OR EQUAL. REFER TO SPECIFICATIONS.
16. METAL STUD BLOCKING
I'1. HINGED MAPS SELECTED BY OWNER
15. 12"x45" MARKER LARD
IQ. "12"x48" TACK BOARP
20. VENDING MACHINE (NIG)
2I. MICROWAVE (NIGH
22. REFRIGERATOR (NIC)
23. FUTURE CUBBYHOLES, CONTRACTOR TO PROVIDE SACKING AS REQUIRED
24. ALTERNATE I; FOLDING PARTITION POCKET
25. ALTERNATE I. CLOSETS. REFER TO FLOOR -PLAN t
26. PLASTIC LAMINATE OVER 3i4" PLYWOOD WITH EASED EDGES. 2-1. 54" GYP BOARD OVER 6" METAL STUDS @ 16" 0.C.
28. FRY "F" MOLD. PAINT BLACK
Drawn by
Checked b
r,rplr7 i_;si.,1,i,1.,.-
Bbis• ions
J
ViAST ATE SERAI DES 8U 1 L.I,I NO
C I T`r' O VI STA
j G ` /' j } `
X I S 1 CAL I F ® (` I 'd I A1
z
INTERIOR.ELEVATIONS
AIO
f • 'r'7 . E. ."
KMM • ROHIVIAUASSOCIATES
3775 Tenth Stmt •\
A/iside. CA. 92501-3669
909/684-}664
FAX 909 /68 46276
5751 Palmer Way; 5uirp C
Cart ct CA 920088872
619 /4383899
FAX 619/931-8194
11/10/2026 C6 174 of 357
TOILET SEAT
ROOM ROOM
NO. NAME
FLOOR
MAT. COLOR
BASE
MAT. COLOR
WAINSCOTWS
MAT. COLOR HGT.
NORTH WALL
MAT. FIN. COLOR
EAST WALL
MAT. FIN. COLOR
SOUTH WALL
MAT. FIN. COLOR
WEST WALL
MAT. FIN. COLOR
CEILING
MAT. FIN. COLOR HGT.
KEY
NO TES
COVER
DISPENSER
LOCATE FLUSH
A1,MIN BUILDINe7
MECHANISM ON TOILET 101 RECEPTIONON CPT RE GBW PT 'GWB PT GWB PT WqGB:PT ACT 1 --IS„ _
PARTITION
102 STORAGE VCT RE GWB
I--
PT 'GWB PT GI>VB FT GINS'PT GINB q' -O"
OPEN SIDE OF STALLCLEAR GRAB BAR OR WALL
22"14"4°
TOI LET
f PARTITION TOILET SEAT
48° MIN AT FRONT -LOAD
COMPARTMENT
OAD
105 ADMINISTRATION CPT RB GWB PT GWB PT GWB PT GWB!PT ACT q' -O" r r r
OR WALL
COVER COMP.(DOORDOPENU)104 HALL VCT RB PTGINEPTGWB'FT GWB PT GWB'ACT q' -O" 36" MIN. GRAB BAR (n 48° MIN.
105 OFFICE VCT RE GWB PT GWB PTI GINS PT GWB PT AGT c1' -O"DISPENSER - 24"
G TOILET TISSUE
r r
106 GREW VCT RB GWB PT GWB PT GWB PT GWE PT ACT q'-0"12+' tn NAPKIN
r r
TOILET TISSUE
106 TECH VGT RB I GW PT GINS PT GIAB GB PT GWB PT .ACT q '-0"o a--C DISPENSER©
DISPOSAL o DISPENSERr
a
r AT WOMEN,lO8 HALL VCT RE GWB PT GWB PT GINS PT GWB3 PT ACT q' -O..UMING'LR,y GIRLS,I Oq WOMEN CT GT FRP FRP FRP FRP GWW I q'_p I
o
w
TYP.
110 W. LOCKER VGT RB I GWB PT GWB PT GWB PT G 4BI PT GWB q' -O"T r--o I I I MEN GT CT FRP FRP FRP FRP GWW q' -O"N m
112 M. LOCKER VGT I RE GWB PT GWB PT GWB PT GINS PT GWB i'-0" 154015 113 READY RM VGT RE GWB I PT }GWB PT I GWB PT GWB PT ACT q' -O" ADULT + ANr,I GAP TO I LET STALL 1/2"2 114 LAUNDRY VGT RE GWB PT ,GWB PT GWB PT GWB,PT ACT q1 -p 115 ELECTRICAL VGT RB GWB PT GINS PT GWB PT GWE PT GWB q' -O"
TOILET SEAT A
II6 TRAINING NOT FINISHED
COVER
DISPENSER (TYP. URINAL
1 I.
j44
IEQ.EQ.
ri
EQ.
r 8
TOILET l5"l5"
i
I
PARTITION
OR WALL
TOILET TISSUE
c
ACCESSIBLE
r
CLR.
r
CLR.
r
HANDICAP
URINAL
I
I
I f
ADi;ALTERNATE NO.I
D I SPENSERG 6..12"
r
NAPKIN
0 4 o /DISPOSAL
X 1I'l TRAINING VCT RB GWB PT GWB PT GWB PT GINS PT AGT 10'-0" x al AT WOMEN
118 TABLE STOR VGT RE GWB PT GWB PT GWB PT 1 --GWB PT GWB q' -O"1 GIRLS, a I TYP.I IQ T.V VGT RB GWB PT GWS i PT GWE3 PT GWB PT .:GWB q' -O"40'o t o1nx 120 CHAIR STOR VGT RB GWB PT GAB PT owe PT GINS PT GWB q -O o -o
1-
4"
FIN. FLOOR
121 RESPIRATOR VGT RE GWB PT GWB PT GWB PT GWB PT ACT 101-0 " 154018
BACK WALL ELEVATION SIDE WALL ELEVATION FRONT
154020
ELEVATION SIDE ELEVATION 122 STORAGE VGT RB GWB PT GWB.PT GWB PT GWB PT AGT 10'-0" 123 MEETING VCT RB GWB'-PT GWB PT GWB FT GWB PT ACT 110'-p"; ADULT TOILET STALL 1/2"3 A1,ULT URINAL 1/2"4
ADD ALTERNATE NO.2
18"24 --
SINGLE
VALVE
LEVEL MIXING
CONTROL
f -z''4 j GARAGEr r r STANDARD HEAD
I i-
PAPER TOWEL
NS -
SOAP DISPENSERDI:::
z
I
m
z
I 24"
TOP OF
MOUN\INGA ALT NIAT I VfO.1-BRACKET
DRYER
I -1J2
r -
o 0 1
42"
r z
36"
MAX.
diMIN.
i-1-
I r__Zo
x 2 m
SEAT m
g CLEAR LEVEL Zo m
cw PROTECT HOT WA Q Q FLR. SURFACE
1 Imvv
SUPPLY * DRAIN
PIPING IN/ HEAT
J 9
CAR. A
3o" WIDE I
48" MIN.
AERIN..LE6ENr) A B B R V I A T I O i l G N RA L I O E S O v v L SOAP DISH
O n 1 INSULATION (TYP.)30 CLR
01 r
r
I._. icv
FIN. FLOOR
r
SPACE t3 -M
FLEXIBLE SPRAY
ACOUSTIC CE TILES ACP ACOUSTIC CEILING PANEL
1-t"SHOWER
FRONT ELEVATION SIDE ELEVATION
HOSE
1/2" MAX.
60" LONG
AGT- I FISSURED M 1 NATONE T 4 G TILE COLOR WHITE
BY ARMSTRONG
CARPET - 001 680
GT CERAMIC TILE
FRP F I BE:RGLASS REINFORCED PANEL
I ALL F=INISHES SHALL COMPLY WITH Iga5 CALIFORNIA
BUILDING GODS, CHAPTERS 4, 6, 7, 8, 10, 25; 26, ,$ WITH TITLE II, CALIFORNIA CODE OF REGULATIONS.
2. FOR ACCESSORY LEGEND REFER TO DETAIL 5/A5
154014 BEVELED
THRESHOLD
AT 45%8
ADULT ANr,I GAP LAVATORY I/2"
HAM, I GAP S OliNER N.T.S.5
CPT- I STYLE
CERAMIC
2'40
TIL
CONFIDENCE
OAS I
155 BY ...14_1 INDUSTRIES
O
GWB GYPSUM WALL BOARD
GWW WATER RESISTANT GYPSUM WALLBOARD24
METAL STUD WALLr
GT- I
PAINT
DANUBE DK-Scf BY DALTI LE
a OO®
P PAINT
SLR
3/4" PLYWOOD GYP. WALL BOARD
BLOCKING PER
DETAIL 1 VAIV1/8
P-1
P-2
PLASTIC
BONE
VISTA
CHINA
SEA
LAMINATE
EX. WW514 BY
131 BY DUNN EDWARD'S
0641
DUNN EDWARDS
I
SEALER
SV SHEET VINYL
VGT VINYL COMPOSITION TILE
I SOLID SURFACING
MATERIAL SPLASH, TOP,
4 APRON
2" DIA. X 3/8" THICK STL.
SLEEVE WHERE ADJACENT
TO GYPSUM BOARD FL -I SEA BRUSHING 762-58
FL -2 DUSTY JADE SlcI-58
PL -3 CLOUD WISH -1212-58
FL -4 COLORADO SLATE '7014-58 BY FORMICA
SUE3BER BASE -- Ocfi65®
2X3 BLOCKING
O< I-1/2" GRAB BARN/DIA.
2 I/2"X2 I/2"X3/I6 STL.
INTEGRAL MOUNTING PLATE
2 m
ANGLE BRACKET 32°
o.c. DOUBLE STUDS
X
7"--"I I/2°
WALL FINISH
n CLEAR SEE FINISH SCHEDULE)I
rVI/8 l'CLEAR
AREA 14
RB- I CHARCOAL 642 RB BY BURKE
it 1-7
TEKS SCREW
J.
CLEAR AREA
vd I
VINYL GOMPOS I TI ON TILE Oaf 65O 5°t 5'i
Ggyp RU,y
VCT-I FOG GRAY 503,1 ARMSTRONG CANVAS
VCT-2 GRAVEL BLUE 52126 ARMSTRONG STONETEX
9TF
c.
No. C-20662
EXp. 3-31-99
P.CALI0
NOTE:
REFERENCE TO TOILET ROOM ELEVATIONS FOR
MOUNTING HEIGTH OR PER TITLE 24, 2-511.
LAVATORY COUNTER I 7 GRAS BAR o STUB WALL.8
11/10/2026 C6 175 of 357
DOOR SGHDDUL E
DOOR (ALL 1 3/4")
SIZE
FRAME TIMELY DETAILS
HEAP JAMB JAMB THRESH HDW LABEL NOTES
POOR SIGNS (I )
INT. TEXT EXT. TEXT 1
DOOR SGHeDULE
POOR (ALL 13L4p)--
SIZE LOUVER MAT' L
FRAME
GOLO MAT' L FINISH COLOR
DETAILS
HEAD JAMB JAMB THRESH DW LABEL NOTES
DOOR SIGNS (I
INT. TEXT EXT. TEXT
4DMiN. BUILDING
2 5
12 14
IS
16 17
IS
f1
20 26
10)
1O2
112
III
108
113
114
I15
116
I(6
108
101
104
101
110
105
104
117
115
A
A
A
g
A
B
A
A
A
a
3'-0"X7'-011
3I-0XI11-0 I1
3i-0 1"IX -0"
5--0/1/X7-0"
3I-O'XT
51 -01X11 -0"
3'-01X11-0"
3'-01)(11-0"
31-0)71-011
3I -01X11-0"
3"-0'X71-0"
3'-0'X711-0°
FOLDING PA
PR)21 / 1X1 Ou
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM.
HM
HM
SGP
SGP
5GP
5GP
5GP
SGP..
5GP
SGP
SGP
5GP
5GP
SGP
5GP
5GP
S&P
56P
5GP
SGP
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
HM
5GP
SGP
5GP
5GP
5GP
5GP
5GP
SGP
SGP
5GP
5GP
5GP
5GP
5GP
SGP
SGP
5GP
SGP
4/A15
10/A15
3/A15
3/A15
4/A15
10/A15
10/AI5
10/AIS
4/A15
10/A15__
4/AI5
3/Al5
10/A15
10/A15
3/AI5
3/A(5
4/A15_
10/A5
I0/AI5
MINDOkM Tb, S
Th
AI
A
15y 3'
6 CBC
AI
CC
L.__J
TOILET DOOR SIGN PER
DETAILS
TOILET WALL SIGN PER
MOUNTED AT LATCH
SIDE OF DOOR
ADDITIONAL SIGN
WHERE OCCURS
TOILET SIGN LOCATIONS I/2"
EQU I LATERAL
TRIANGLE
IN 12" DIA CIRCLE /
BACKGROUND /
COLOR ----
I/2 " WIDE BORDER, TYP. --
SIGN SHALL BE A 12" DIA.
CIRCLE AT WOMEN/GIRLS
AND A 12" (EACH SIDE)
EQUILATERAL TRIANGLE
AT MEN/BOYS
C \
I
SIGN TO BE CLEAR
ACRYLIC FACE WITH
GRAPIGS SILK SCREENEL
ON BACK, PERMANENTLY
ADHERED TO OPAQUE
ACRYLIC BACK
ATTACH 5IGN USING
FLATHEAD
COUNTERSUNK SCREWS
TO SOLID BACKING
AND ADHESIVE TO
BACK
NOTE:
SIGN TO BE DISTINCTLY
DIFFERENT FROM THE
WALL IN COLOR 4
CONTRAST.
INTERIOR TOILET r;O0R SIGN SII 3
I1/A15
15/A15
8/A15
8/AI5
1/AI5
5/A15
I5/A15
15/AI5
1/A15
15/A15
1/AI5
8/AI5
15/A15
15/AI5
8/AI5
S/AI5
1/AI5
8/A15
15/A15
11/A15
15/A15
8/A15
8/A15
1/A15
15/AI5
15/AI5
15/AI5
1/A15
15/A15
1/AI5.
S/AI5
15/A15
15/A15 '
5/AI5
5/AI5
4/A15
15/A15
18/A15
I8/A15
IS/A15
IS/A15
XTR
10 MIN
10 MIN
20 MIN
20 MIN
20 MIN
20 MIN
20 MIN
20 MIN
20 MIN
20 MIN
EXIT
STORAGE
MEN/LOCKE
MEN
EXIT
READY RM
LAUNDRY,
TRAINING,
TRAINING
EXIT
WOMEN
6/Al2
2/Al2
2/Al2
I/Al2
6/Al2
2/Al2.
2/AI2_
2/Al2
2/Al2
b/Al2
I/AI2
TECH
V MEN/LOG
OFFICE
EXIT
2/Al2
2/AI2
2/Al2
6/Al2
Administration
Training
Administration
2/Al2
2/Al2
2/AI2
ADD ALTERNATE NO.
13 21
23 108
IOS
I I?
A
A
G
G
3-0"X7'-0"
PR)2-O'X1'-0
HM
HM
HM
HM
SGP
SGP
SGP
5GP
HM
HM
HM
HM
5GP
5GP
5GP
5GP.
10/A15
IO/AI5
10/A15
10/A15'
15/AI5
I5/A15
15/A15
15/AI5
15/A15
15/A15
15/A15
IS/AI5
20 MIN
20 MIN
20 MIN
20 MIN
STORAGE
RESP. RM
2/Al2
2/Al2
ADS ALTERNATE NO. 2 (FUTURE)
DOOR TYRES GENERAL NOTES
KP KP KP 1 rKP
1/2" R
PHENOLIC. POLYESTER
INTERIOR) INSERT
HELVETIGA LE tRS
RAISED 1/32" (EXTERIOR)
a" PHOTO ETCHED
MAGNESIUM PLATE INSERT
EXTERI OR)
I" HELVETIGA
NUMBERS
RAISED 1/32"
6"
Conference
Room
41)
T
GRADE 2 BRAILLE --7
OF ALL TEXT ABOVE
INTERIOR/EXTERIOR NAME 5 GN NTS
Q Q Q
5/5" UPPER 4 LOWER CASE HELVETICA CONTRACTED
GRADE 2 BRAILLE DOTS 1/1O" O/C, 2/1O" SPACING
BETWEEN CELLS
ACCESSIBILITY SYMBOL WHERE INDICATED IN
SCHEDULE
NOTES:
I. SIGNS ARE TO BE DISTINCTLY DIFFERENT FROM THE WALL
IN COLOR AND CONTRAST.
TOILET WALL SIGN 6RAP GS NTS 4
A. MAXIMUM DOOR CLOSER PRESSURE:
8.5 LBS. PRESSURE FOR EXTERIOR DOORS
5.0 LBS. PRESSURE FOR INTERIOR DOORS
15.0 LBS. PRESSURE FOR FIRE DOORS
B. ALL HARDWARE FOR FIRE RESISTIVE LOCATIONS SHALL BE FIRE RATED BY AN APPROVED TESTING LABORATORY.
G. ALL FIRE RATED DOORS IN EXIT CORRIDORS AND LOBBIES SHALL BE PROVIDED WITH APPROVED SMOKE GASKETS TOP AND SIDES.
D. ALL EXIT DOORS IN BUILDINGS, INCLUDING BUT NOT LIMITED TO DOORS
OF TOILETS AND STORAGE ROOMS, SHALL CONFORM WITH THE REQUIREMENTS OF SECTION 1004,G.B.C. 1115 EDITION. THE FOLLOWING ARE SOME REQUIREMENTS:
EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT.
HAND ACTIVATED DOOR OPENING HARDWARE SHALL BE CENTERED BETWEEN 30" AND 44" ABOVE FLOOR.
E.
F.
G.
DEAD BOLTS MAY BE USED IF THE OCCUPANCY IS LESS THAN 10. DEAD BOLTS MUST BE MOUNTED BETWEEN 30" AND 44". DEAD BOLTS MUST BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE. LEVER SHALL RETRACT THE BOLT BUT NOT RESET OR LOCK. THE BOLT MAY BE KEY OPENABLE FROM THE EXTERIOR.
ALL WOOD AND HOLLOW METAL DOORS ARE I 3/4" THICK UNLESS OTHERWISE NOTED.
AT FIRE RATED DOORS EXTEND DRYWALL INTO THROAT OF FRAME OR GROUT FRAME SOLID.
DOOR SCHEDULE NOTES ABBREVIATIONS
NOT USED
NOT USED
PROVIDE ACCESSIBILITY SIGN UNDER WALL SIGN PER DETAIL
INSTALL STOP IN SLIDING DOOR TRACK TO LIMIT DOOR RETRACTION. PROVIDE 32" CLEAR OPENING
PROVIDE 4x6 BLOCKING FOR DOOR HOLDER
FOR TYPICAL DOOR SIGN LOCATIONS SEE DETAIL I/AI2
rr
1/2" R
FRAME
PHENOLIC POLYESTER
INSERT
SYMBOL
RAISED I/32"
5/8" HELVETICA
LEI I tRS
RAISED I/32"
6"
GRADE 2 BRAILLE -- -
OF ALL TEXT ABOVE
NT17.R I OR TOILET 51 GN NTS
ACCORD AGGORPIAN FOLDING DOOR
AGP ACOUSTIC CEILING PANEL
CPT CARPET
GT CERAMIC TILE
GONG CONCRETE
ESP EGGSHELL PAINT
EW-I,2,3 EXTERIOR WOOD FINISI-
SEE 01100
FRP
FRZR
GWB
GWX
GWW
FIBERGLASS REINFORCED PANEL
FREEZER DOOR
GYPSUM WALL BOARD
GYPSUM WALLBOARD TYPE X
WATER RESISTANT GYPSUM WALL BOARD
HM HOLLOW METAL
IW-1,2,3 INTERIOR WOOD FINISH
SEE 01100
MESH WIRE MESH PARTITION
P
PL
RB
REFER
SCWD
SGP
SHWR
STL
SV
VCT
VFBI
WD
45M
60M
10M
PAINT
PLASTIC LAMINATE
RUBBER BASE
REFRIGERATOR DOOR
SOLID GORE WOOD DOOR
SEMI GLOSS PAINT
SHOWER DOOR
STEEL
SHEET VINYL
VINYL COMPOSITION TILE
VINYL FACED BUILDING
INSULATION
WOOD
45 MINUTE RATED
60 MINUTE RATED
10 MINUTE RATED
1/2" R
FRAME
PHENOLIC POLYESTER
INSERT
I" HELVETICA LEI i LRS
RAISED 1/32"
GRADE 2 BRAILLE —
OF ALL TEXT ABOVE
AT EXTERIOR MOUNTED EXIT SIGNS PROVIDE
I/8" PHOTO -ETCHED MAGNESIUM PLATE INSERT.
INTERIOR EXIT SIGN NTS
o \
p R(7y4,
No, C-20662
Exp. 3-31-99
raI
1',; -. r, 2.90.10
rlS •
Architects / Planners
RUHNAU • RUHNAU ASSOCIATES
5751 Palmer Way, Suite C
Carlsbad, CA 920088872
760/ 438-5899
FAX: 760/931-8194
3775 Tenth Street
Riverside, CA 9250/-3669
909/684-4664
FAX: 909 / 684-6276
liSASTE^ATER SERA G S
GIT`I' O vISTA
VISTA, GAL. I PORN I A
kD BOOR SC.-!
Al2
11/10/2026 C6 176 of 357
STEEL STUD WALL PER PLAN
WALL FINISH PER FIN. SCHED.
WALL CABINET:
14 STSM SCREWS
INTO CABINET BACKING
2 -SCREWS PER CABINET
AT EA. BACKING LOCATION
TYP. ALL CABINETS), MIN. 16" O.G.
SHELF:
MIN. ONE PER CABINET,
ADJUSTABLE, SEE
CABINET ELEVATIONS.
ANCHORS:
4xI6GA. G.S. DEEP LEG
TRACK BACKING CONT.
LENGTH OF CABINET
COVE BACK -
SPLASH -RE -TURN ® SIPEWALL
HANGER WIRE
ALL SURFACES PLASTIC
LAMINATED
VARIES
SEE TNT. ELEVATION
NOTE:
STEEL BACKING/ ARE REQUIRED AT
CABINETS AFFIXED TO EXISTING
WALLS. REMOVE PORTION OF
EXISTING WALL AS NECESSARY
TO INSTALL BACKING. PATCH
AND REPAIR WALL PRIOR TO
INSTALLATION OF CABINETS.
5/b" X 3/4" COLOR CORE
SHELF LIP, TYPICAL
BASE CABINET ONE ADJUSTABLE
C,I IELF 16" DEEP
BASE, SEE FIN. SCHEDULE
NOTE:
ANCHORAGE OF TALL CABINETS $ SHELVING UNITS
SIMILAR EXCEPT ANCHOR ® TOP $ BOTTOM ONLY.
CASEWORK LNG ORAL
STEEL STUDS
PER PLANS
2-#I4 5M SCREWS
W/ NEOPRENE WASHERS
16 GA. G.S.M. DEEP LEG
TRACK BACKING CONT.
ALL CABINETS, SHELVING,
TACKBOARDS, ETC.
CAS I NET SACKING NTS 11
BLOCK $ ANCHOR EACH
SIDE
3/4" TYPE I -M-2 PARTICLE
BOARD CABINET SIDE
3-#IO X 2 1/2" RHWS @6"OC
3/4" HARDWOOD
CABINET RAIL
I 1/2 "X4"X 11-4" BLOCKING
3-#10X3" RHWS @6" O.C.
1 1/2" X 5 1/2" X 11--4"
BLOCKING
2 POWDER DRIVEN
FASTNERS AT S' O.G.
GAS I NET ANCHORAGE 16
COUNTER SUPPORT
It- 2 I/2"50 X
14 GAUG
METAL ROOF
STEEL PURL I N
2) # 12 TENS (HEX
HEAD) SELF DRILLING
FASTENERS
REF. TO DETAIL Ici/AIS
FOR ATTACHMENT
WIRE 5RAGING 2
TOP OF COUNTER, PLAS.
LAM. OVER 3/4" TYPE
1-M-2 PARTICLE BRD.
U.N.O.
1 1/4" X 2 1/2" BLKING.
W/ #1O FHWS @ 6" O.G.
PLAS. LAM. OVER I I/4"
TYPE I -M-2 PARTICLE
BOARD.
RUBBER BASE O/GL I PS
I/8"XI I/2 "XI I/2 "XI 1/2"
LONG S5 CLIP ROUTED
INTO PLYWD. W/2-FHWS
2 CLIPS PER SIDE
RUN FUR FINISH
OVER CLIPS
FINISH FLOOR
8 REDHEAD ANCHOR
7 1 1/2"
064005
PLASTIC LAMINATE
3/4" TYPE I -M-2
PARTICLE BOARD
GORE
PLAS. LAM. EDGE
3/4" X I 1/2" SLK I NG
PLAS. LAM. FLUSH
DOOR/DRAWER
ON 3/4" TYPE I -M-2
PARTICLE BOARD
W/ BACKER SHEET
U.N.O.
GA5INET TOP Er,GE 5"I 12
24"
GLR AREA
HOT WATER AND DRAIN
PIPES ACCESSIBLE UNDER
SINKS SHALL BE INSULATED
THERE SHALL BE NO SHAR
OR ABRASIVE OBJECTS
OR SURFACES UNDER SINK
ts-
AREA NOT DIAGONALLY
HATCHED BELOW COUNTER
MUST BE ACCESSIBLE
CLEAR.
RUBBER CASE
H.C. SINK CABINET 17
SOFFIT
TYP
COMPRESSION STRUTS: STEEL SECTION W/ L/R RATIO OF
200 MAX. ATTACH TO MAIN RUNNERS W/ 1/4" M -BOLT
AND TO Sir<UCTURE W/ 3/16" DIA. POWDER DRVEN STUD.
COMPRESSION STRUT SHALL NOT REPLACE HANGER
WIRE.
NOTE: SEE DETAILS
FOR CONNECTIONS OF
BRACING 4 HANGER
WIRES TO THE
STRUCTURE ABOVE
45 'MAX. VERTICAL, -
TYPICAL
2" MAX. FROM BRACING
WIRES TO CRSS RUNNERS
12 GA. VERTICAL HANGER
WIRE AT 4'-0" EACH WAY W/
MIN. 3 TIGHT TURNS IN
I-1/2" BOTH ENDS OF
WIRE, TYPICAL
4)-12 GA. SPLAYED WIRES
40 ° APART HORIZONTALLY
W/ MIN. 4 TIGHT TURNS
IN I -I/2" BOTH ENDS
OF WIRE TYPICAL.
WIRES SHOULD BE TAUT
WITHOUT CAUSING THE
CEILING TO LIFT
NO SPLICES PERMITTED.
MAIN RUNNER
CROSS RUNNER
SPLAY 15RAG I NG I;ETAIL.NTS
1 METAL STUD GE I L I NG
FRAMING
5/8" GWB
J -MOLD
ACCESS DOOR, 3O" X 36"
MILGOR 3203-OI ci)
ACCESS 1;OOR GW 3 3 11
A.G.P.
5/8 GWB
SUSP. CEILING
METAL STUD HEADER
CORNER REINF.
USG 4* 8OO)
3"13
L
L
8" MAX
GA GALV.
HANGER WIRES
12 GA. GALV.
SPLAY WIRES,
45%8 MAX.
ANGLE, PER EA.
cib 5F. USE 4
FULL TURNS EA
CONNECTION
1 1/2" CHANNEL
4'-0" O.G.
HAT -SHAPED
FURRING, @12" O.G.
5/8" GINS
A.G.T. WHERE
OCCURS
5/8" GWB
DRILL HOLE IN
CHANNEL WIRE
TO STUDS
GAB CEILING 18
FACE OF WALL
8" MAX.
OR WITHIN 1/4 OF THE
LENGTH OF THE END TEE,
WHICH EVER IS LEAST.
12 FHMS AT 24" O.G. MIN.
SECURE WIRES TO
STRUCTURE ABOVE -
SEE DETAIL
12 GA. HANGER WIRES
AT 4'-0" O.G. EACH WAY
W/ 3 TIGHT TURNS IN 1 1/2"
MAIN "T" AT 45" O.G.
GR055 "T" AT 24" O.G.
ACOUSTIC LAY -IN PANEL
POP RIVET TO " T "5 AT
TWO (2) ADJACENT SIDES.
PERIMETER STARTER WALLS
PERIMETER WALL ANGLE NTS
CAD SECTION
5" MAX.
OR WITHIN 1/4" OF THE LENGTH OF
THE END -tom, WHICH EVER IS LEAST.
1/2" MIN. CLEAR
1 I
I
WALL ANGLE
FACE OF WALL
V" STRUT
DRILL HOLE IN " T " RUNNER
INSTALL 6d RING SHANK
NAIL
ACOUSTICAL LAY -IN
PANEL
T" RUNNER
12 GA. HANGER WIRE W/
3 TIGHT TURNS IN 1-1/2"
INTERLOCK " V " STRUTS OR
HORIZONTAL 16 GA. TIE WIRE
2 WALLS OPPOSITE POP
RIVETED WALLS.
T" RUNNER
1 • ACOUSTICAL LAY -IN
PANEL
ALTERNATE LOCATION
WITHOUT NAIL
NOTE: WHERE THE PERPENDICULAR DISTANCE FROM
THE WALL TO THE FIRST PARALLEL RUNNER
IS 12" OR LESS, THIS INTERLOCK 15 NOT REQUIRED.
OPPOS I TE WALL OSTARTER WALL
PERIMETER All ANGLE
METAL ROOF
El
STEEL PURL I N
3 5/8"x25 GA.
STL. STUD
BETWEEN PURLINS
3) 4* 12 TEKS
HEX HEAD)
SELF DRILLING
FASTENERS
2) 4* 12 TEKS (HEX _
HEAD) SELF DRILLING
FASTENERS
CUT OFF FLANGES
AND BEND WEB OVER
COMPRESSION STRUT
TOP CONNECTION
STEEL STUD
COMPRESSION STRUT
SEE SCHEDULE
REMOVE FLANGES
TO PROVIDE TIGHT FIT
ON TOP OF MAIN RUNNER
2- 5-12 DRYWALL SCREWS
THROUGH MAIN RUNNER
STUD WEB
MAIN RUNNER
COMPRESSION STRUT
BOTTOM CONNECTION
NOTE
I. COMPRESSION STRUTS SHALL
NOT REPLACE HANGER WIRE
2. CEILING TILE NOT SHOWN FOR CLARITY
NTS
COMPRESSION
SCHEDULE
STRUT
MAXIMUM
LENGTH OF
STRUT
STRUT
1' -III'
I 5/8"X25 GA
C" -STUDS
11'-2"
2-I 5/8 "X25
GA"G"-STUDS
SEE DET. BELOW
16'-6"
2-2 1/2 "X25
GA. "C" -STUD
SEE DET. BELOW
231-0"
2-3 5/8"X25
GA. "C "-STUD
SEE DET. BELOW
STEEL C STUDS
3/8" 5-12 (12 GA.)
SCREWS AT 18"
O.G. AND 6"
FROM ENDS.
COMPRESSION STRUT 3 II 19
O
e
0 O
O
04O _
a _
O
0 0
0 PERIMEl EK STAR r _ ER WALLS,
GRID ATTACHED TO (2) ADJACENT WALLS
O
O
1'
CROSS ELS
AT 24" O.C
MAIN RUNNERS
AT 45" O.G.
NOTES:
0 O
3 1
4 EA. 12 GA. SPLAY
WIRES. (SEE NOTE #5)
V" STRUT AT FREE WALLS
12 GA. HANGER WIRES AT
4'-0" O.G. EACH WAY
ALONG MAIN RUNNERS
I. CLASSIFICATION OF CEILING GRID 15 : HEAVY DUTY
MAIN RUNNER
CROSS RUNNER
RUNNER SPLICES
I2 GA. HANGER WIRES AT
5" FROM ALL WALLS AT
ALL MAIN RUNNERS #
CROSS TEES
OPPOSITE FREE WALLS, NO GRID
ATTACHMENT, 1/2" MIN. CLEAR
FIXTURES, SUPPORT
PER NOTES
MANUFACTURE'S
CATALOG NO.S
USG, or EQUAL)
DONN DX 26
DONN DX 424
INTEGRAL
2. THESE PLANS AND SPECIFICATIONS ARE FOR CEILING SYSTEMS WHOSE WEIGHT
INCLUDING AIR CONDITIONING GRILLES AND LIGHT FIXTURES DOES NOT EXCEED FOUR (4) P.S.F. HEAVIER SYSTEMS AND THOSE SUPPORTING LATERAL LOADS FROM PARTITIONS WILL REQUIRE SPECIAL DESIGN DETAILS.
3. SPLICES WILL NOT BE FERMI I la) IN ANY HANGER WIRES. 4 PROVIDE TRAPEZE OR OTHER SUPPLEMENTARY SUPPORT MEMBERS AT OBSTRUCTIONS TO MAIN HANGER SPACING. PROVIDE ADDITIONAL HANGERS, STRUTS OR BRACES AS REQUIRED AT ALL CEILING BREAKS, SOFFITS OR DISCONTINUOUS AREAS. HANGER WIRES THAT ARE MORE THAN I IN 6 OUT OF PLUMB SHALL HAVE COUNTER -SLOPING WIRES.
PROVIDE SETS OF FOUR 12 GA. SPLAYED BRACING WIRES ORIENTED 40 DEGREES FROM EACH OTHER AT THE FOLLOWING SPACING:
A. FOR OFFICE BUILDINGS, PLACE SETS OF BRACING WIRES NOT MORE THAN 12 FT. BY 12 FT. ON CENTER.
B. NOT USED
C. PROVIDE BRACING WIRES AT LOCATIONS NOT MORE THAN I/2 THE SPACING
GIVEN IN A AND B ABOVE FROM EACH PERIMETER WALL AND AT THE EDGE OF VERTICAL CEILING OFFSETS FOR BOTH SCHOOL AND HOSPITAL BUILDINGS.
6. FASTEN HANGER WIRES WITH NOT LESS THAN 3 TIGHT TURNS. FASTEN BRACING WIRES WITH 4 TIGHT TURNS. MAKE ALL TIGHT TURNS WITHIN A DISTANCE OF I -I/2 INCHES.
HANGER OR BRACING WIRE ANCHORS TO THE STRUCTURE SHALL BE INSTALLED IN SUCH A MANNER THAT THE DIRECTION OF THE WIRE ALIGNS A5 CLOSELY A5 POSSIBLE WITH THE DIRECTION OF THE FORCES ACTING ON THE WIRE.
7. SEPARATE ALL CEILING HANGING AND BRACING WIRE -5 AT LEAST 6 INCHES FROM ALL UNBRACED DUCTS, PIPES, CONDUIT, ETC. IT IS ACCEP I ABLE TO ATTACH LIGHTWEIGHT ITEMS, SUCH AS SINGLE ELECTRICAL CONDUIT NOT EXCEEDING 3/4" NOMINAL DIAMETER, TO HANGER WIRES USING CONNECTORS ACCEPTABLE TO DSA/SSS.
5. WHEN DRILLED -IN CONCRETE ANCHORS OR SHOT -IN ANCHORS ARE USED IN REINFORCED CONCRETE FOR HANGER WIRES, I OUT OF 10 MUST BE FIELD TESTED FOR 200 POUNDS OF TENSION. WHEN DRILLED -IN CONCRETE ANCHORS ARE USED FOR BRACING WIRES I OUT OF 2 MUST BE FIELD TESTED FOR 440 POUNDS IN TENSION. SHOT -IN ANCHORS IN CONCRETE ARE NOT FERMI I I EL) FOR BRACING WIRES. IF ANY SHOT -IN OR DRILLED -IN ANCHOR FAILS, ALL ADJACENT ANCHORS MUST BE TESTED.
NOTE: DRILLED -IN OR SHOT -IN ANCHORS REQUIRE SPECIAL D5A/S55 APPROVAL WHEN USED IN PRESTRESSED CONCRETE.
4. ATTACH ALL LIGHT FIXTURES TO THE CEILING GRID RUNNERS TO RESIST A HORIZONTAL FORCE EQUAL TO THE WEIGHT OF THE FIXTURES. ALL LIGHT FIXTURES SHALL BE ATTACHED SECURELY TO THE GRID WITH 4 SCREWS, ONE AT EACH CORNER OF THE FIXTURE.
10. FLUSH OR RECESSED LIGHT FIXTURES AND AIR TERMINALS OR SERVICES WEIGHING LESS THAN 56 POUNDS MAY BE SUPPORTED DIRECTLY ON THE RUNNERS OF A HEAVY DUTY GRID SYSTEM BUT, IN ADDITION, THEY MUST HAVE A MINIMUM OF TWO 12 GA. SLACK
SAFFETY WIRES ATTACHED TO THE FIXTURES AT DIAGONAL CORNERS AND ANCHORED TO THE STRUCTURE ABOVE. ALL 4 FT. X 4 FT. LIGHT FIXTURES MUST HAVE SLACK SAFETY WIRES AT EACH CORNER.
II. ALL FLUSH OR RECESSED LIGHT FIXTURES AND AIR TERMINALS OR SERVICES WEIGHING 56 POUNDS OR MORE MUST BE INDEPENDENTLY SUPPORTED BY NOT LESS THAN 4 TAUT 12 GA. WIRES EACH ATTACHED TO THE FIXTURE AND TO THE STRUCTURE ABOVE REGARDLESS OF THE TYPE OF CEILING GRID SYSTEM USED. THE 4 TAUT 12 GA. WIRES
INCLUDING THEIR ATTACHMENT TO THE STRUCTURE ABOVE MUST BE CAPABLE OF SUPPORTING 4 TIMES THE WEIGHT OF THE UNIT.
12. NOT USED
13. 14.
SUPPORT SURFACE MOUNTED LIGHT FIXTURES BY AT LEAST TWO POSITIVE DEVICES
WHICH SURROUND THE CEILING RUNNER AND WHICH ARE EACH SUPPORTED FROM THE STRUCTURE ABOVE BY A 12 GA. WIRE. SPRING CLIPS OR CLAMPS THAT CONNECT ONLY TO THE RUNNER ARE NOT ACCEPTABLE. PROVIDE ADDITIONAL SUPPORTS WHEN LIGHT FIXTURES ARE 8 FEET OR LONGER.
SUPPORT PENDANT MOUNTED LIGHT FIXTURES DIRECTLY FROM THE STRUCTURE ABOVE
WITH HANGER WIRES OR CABLES PASSING THROUGH EACH PENDANT HANGER AND CAPABLE OF SUPPORTING 4 TIMES THE WEIGHT OF THE FIXTURE. ATTACH ALL LIGHT FIXTURES TO
THE CEILING GRID RUNNERS TO RESIST A HORIZONTAL FORGE EQUAL TO THE WEIGHT OF THE FIXTURES. SPECIAL DETAILS ARE NECESSARY FOR THIS CONDITION AT THE CEILING GRID.
LAY- IN GEILING REQUIREMENTS NTS 15
p `O
R1.yy9G
ro,vn y
Checked by
RMrnavDate
I
1 Architects/ Planners
AST AER SRV
CITY O VISTA
VISTA, CALIFORNIA
OS 5UILam NG I L NO AN) OAS!
TAIL S
OR4K
A13RUHNAt1ASSOCIATES
a775ver d,Tenth 925reetRiversideCA92501-3669
909 / 684-4664
FAX: 909 / 684-6276
5751 Palmer,92 8867Carlsbad, CA 92008-8872
76O/ 438-5899
FAX. 760 /931-8194
11/10/2026 C6 177 of 357
SIN&LE Plece 14 GA aAL.V. STL,
CUM3 LISINe BUTLKIetII SAS ;.
ANeL, ToP TO 5e LEVEL,
MECHANICAL CURB
FIBERGLASS
REINFORCED PANEL
WHERE OCCURS
4" TOPSET
RUBBER BASE
OR CERAMIC TILE
FINISH
FLOOR
r
n
ILJ
I
L.
L
i
WALL FINISH
v -
NTS
FACTORY FINISH
EXTRUDED ALUMINUM
TRIM
RUE3E3ER SASE @
FIBERGLASS
REINFORCED PANEL
SHEET
VINYL
SOLID -
BACKING
5"
1 FACTORY FINISH
EXTRUDED ALUMINUM
TRIM
SHEET VINYL. SASE @ F.R.P.
METAL STUD
CONCLURB
SIM
J -MOLD
2ciQlO\16Ai4 •
5"
FRF
WALL FINISH PER
RM FIN SCHED
r - FACTORY F I N
EXTRUDED
ALUMINUM TRIM
CERAMIC TILE
INTERIOR GUR3 @ TOILET RMS 511
WALL CLOSURE
11 16
DIMENSIONS
PIPE SQii BASE UNIT
OUTSIDE DIAMETER HEIGHT
DIAMETER)
1/4' TO 4 7314• 4`.
4" TO T 103!4'5"
T TO13"161/2'r . .
PIPE P!NETRAT I ON
SPECIFICATIONS
Pipe flashing units shall I» wed of Ethylene
Propylene Menas Monomer (E.P.D.M.) rubber.
A duce aluminum reinforcing dg shall be bonded
to a rubber flange on the base of the flashing unit,
Temperature ranges -252 F to 250* F. Pips flashing,.
shall bei>:Ied in socordanwweh BullerrUanuufac-
turig Company erection drawings.
NTS
SPECIFICATIONS •
1. Gutter shall be Butler contour type and shall be
fabricated from galvanized steel, ASTM Wed'
cation A525. G9Q coating, latest issue,
2: Gutters shall have a factory finished pain appGca
tion and shall be supported by plain or painted
galvanized steel hangers from the roof panels.
3. Preformed comer closures shal be installed to
match the. contour configuration of the gable trim
and gutter.
4. Preformed weather seals shall be instated to
completely fill roof corrugation voids prior to in
stallation of the gutter (optional).
5. Preformed steel wall closures shall* installed to
close corrugations in wall panels prbrto installa-
tion of gutters. Preformed wall closures (optional)
shall be 26 gage gaivanizedsleek factory pained.
6. Refer to the Technical Reference Manual to cal
culale downspout spacing based on rainfall inten
sly
XHAUST FAN CURS
BUTLERRIB H
WALL
BASE CLOSURE
EDGE OF
FOUNDATION
2gO2O\I7Al4
EXTERIOR G.dR 3
6 1/2" r
CORD, W/GIR' SIDE
NT5
NTS
7 12
FINISH FLOOR
17 SILICONE
FOAM
F I RESTOPP I NG
SEALANT
J
PURL I N -
fry
PARTITION HEAo
L _
NOTE:
ATTACH FRAME TO STUDS
PER MANUF. RECOMMENDATIONS
CONT DEEP
TRACK STUD
STUD FILLERS
RATED WALL
ASSEMBLY
SEE
CONT DEEP
TRACK STUD
3 PARAPET GAP 15
GYP. BD.
4<-E 3. roL-UM;•l
HINGE
BLOCKING
JAMS @ OL I NG PARTITION
BUTLERIB II
5-3/4"•STRUCTURAL LINE
BUTLERIB II ROOF
5 RAKE TRIM
Z.
III ni I
1 Ii cII I
SUBBASE COMPACTED
PER EARTHWORK SPECIFICATION
INTERIOR FLOOR SLAS
NTS 13
CONCRETE SLAB
2" SAND CUSHION
VAPOR BARRIER
5 18
EXHAUST FAN
PLYWOOD
FASTENER
W/ NEOPRENE WASHER
INTO 2 X 6 JOIST
22 GA GSM COVER
CLEAT @ I6" O/G
JOIST HANGER
HUNG FROM CURB
14 GA GALV. SHEET MTL --
SINGLE-PIECE CURB, TOP LEVEL
METAL ROOF -
PANEL
T 7\
2X6JOIST @ IS" O/C • /
ROOD EGZUIP. PLATMORM
WALL PANEL
SUPPORT ANGLE
FLASHI
7 RAKE TO MALL" FLASHING
EXT. PLASTER
5"
VINYL FACED
METAL BLDG.
WALL GIRT
WALL GIRT
BATT INSUL.
6" METAL
STUDS
r 5"9
3b" PLASTER
OVER PLYWOOD
PLYWOOD
RADIUS PLASTER
STOP
BITUTNENE FLA5HIN6
E) BUILT-UP
ROOFIN8
1-ASI NG D!TA I L.Su 14
19 INTERNALLY INSULATED
GSM DUCT
CLEAT @ 16" O/C
2X6CURB
22 GA GSM COVER
z
CLEAT @ 16" O/C
JOIST HANGER
14 GA GALV. SHEET MTL---
SINGLE -PIECE CURB, TOP LEVEL
DUCT MRU ROOD
NOTE:
ALL STRUCTURAL
SUPPORTS 8 SOUND
BAFFLING NOT BY
MODERNFOLD.
ACCESS TO TRACK
HANGER BOLTS
NECESSARY IF
ADJUSTMENT AFTER
INSTALLATION 15
REQUIRED
FLUSH CEILING
CONSTRUCTION
GUIDE RAIL
OL.D I NCB PART I T I ON i s"10
7r vv by
Architects /Planners AAST 'AER S RV I C!S S D N1
G I TY O VI STA
VISTA, G A L L I V R I t A
ROOD AND H SC-. :;'EA LS
A14RUHNAU •RUHNAU ASSOCIATES
575! Palmer Way, Suite C 3775 Tenth Street
Carlsbad, CA 920088872 Riverside, CA. 9250!-3669
619 / 438-5899 909 / 6844664
F/A)C 619/ 931-8194 FAX: 909 / 684,527611/10/2026 C6 178 of 357
r :.: ,_r
6" METAL STUD
IS GA. "Z"SPACER
BATT INSULATION
METAL WALL -
PANEL J 5/8" GWB
DOOR POST TO
FOAM CLOSURE
5/8" GINS
FRP
6" METAL STUDS
16" O.C.
5/8" GWB
1 I1 GIRT ABOVEGIRT0-
GIRT
METAL5" METAL STUDS
WALL PANE DOOR POST SECTION
BETWEEN JAMBS
i8,1 STEEL FRAME
I N
BETWEENWEE JAMBS
1/4 SEALANT JOINT IN/SHTSHT MTL
FLASHING 3/4" X I" 5TL CHANNELMEADTRIM
r BACKER ROD.CA
J
r\r t0 r -
GO ATL I 5-0''
STEEL FRAME
I
I I5/16'-1 15/16"
DOOR
I
I- i
J I/4 GLASS
I
115/16'l I5/I6'
r
I I DOOR
I I
I i
r
I I
I I
FLASHING SHALL
BE PROVIDED BY
W I NDOIN MFGR.C
r
J J
SL 11 I NO Vol NDOhI HEAD 3"1 2 INTERIOR.DOOR AD 3"3 EXTERIOR DOOR HAD 5„4 RAistlE ANCHOR.6"5 6" METAL STUD DOUBLE
r5/5" GWB
F.R.P. PANEL
I/4" SEALANT JOINT
STEEL FRAME
DOOR
L
STUDS
5/8" GWB
5/8" GINS
METAL
1/4" SEALANT JOINT
BATT 1NSUL.
SEALANT
U STEEL FRAMEs
r-- _ - - -I/3"x3/4" CHANNEL
i
I 5/a",
f `
STEEL FRAME6,. METAL STUD
n LIN/BACKER ROD
METAL STUDS ,
DOOR POST
N
C
JAMB . ANCHOR GONT TO GIRT ASV.
E
r IL
115/I6";1 15/16„
I
WINDOW CHANNEL 1 in
BUTLERI B II
SIDING
DOOR /5"i
1/4" GLASS 2
DRYWALL
5/8" RETURN, TYP.
rFRPPANEL
WHERE OCCURS J
SL. I D I NG 1I NDOV4 JAMS i6 I/8"7 INTERIOR DOOR JAMB 3"8 DOOR JAMS 3"9 INTERIOR DOOR HEAD s"10 I
6" TYPICAL
INTERSECTING WALL
OCCURS
WHERE
WHERE 63HOODSEALDOOR
OCCURS
v
MERGER
TILE REDUCER
8" METAL STUD
G
I
1/4" GLR. GLASS
I
CONCRETE
FLOOR
VINYL
COMPOSTION
TILE
SILL CHANNEL
1/4" SEALANT
BACKER ROAD
JOINT W/
I
I
5/8 GWB
STEEL FRAME
DOOR
I DOOR HOOD
JAMB ANGLES -EXTEND
SUPPORT DOOR HOOD
TO
L
A V.G.T. OR S.V.CONCRETE
5/5 GWB
METAL WALL I
3/16X2"I t-
I
PANELi
6" METAL STUD DOUBLE METAL STUDS Ln
DODR WHERE 63LINTELSEAL
OCCURS
s-
w
MERGER
TILE REDUCER C
JAMS ANCHOR
METAL WALL
PANEL
D-
FOAM CLOSURE
BATT INSULATION
TILE O/ FULL
SETTING BED
VINYL
COMPOSTION
DRIP
VGT OR S.V.TILE
N \, -% \.
r
I
POOR GUIDE r
2" r
DRYWALL
5/5H RETURN
TYPICAL
MG 8X18.5 CHANNEL FRAME
sL I D I NO his I NDO SILL 5"11 GO I L I NO DOOR HE/4%r;NIG)5"13 FLOOR TRANSITIONS 3"14 INTERIOR BOOR JAMES 15
SET N FULL
E3ED OF
SEALANT
DOOR PER
SCHEDULE
DROP SEAL
s
DOOR WHERE
OCCURS
MERGER IMPERIAL
REDUCER
CARPET VINYL
COMPOSTION
1 TILE
A V.G.T.OR S.V.CARPET
o
EXT. SLAB,
SLOPE @ 2%
MAX.
cv
ALUMINUM
THRESHOLDz
O m
tea„
DOOR WHERE
OCCURS
MERGER IMPERIAL
REDUCER
cv
F.F.
TILE O/ FULL
SETTING BED
CARPET
8 ,
5402'J
DX E.D
cm( cum( cc cc( c\
TI
l
L / CARPET
AR
0 N C-20662
Exp', 3-31-99
F
OF_ cr*-ALCOVE t.G 1,.F.I/2 "16 17 DOOR TRSOLD 3"18 L OFLOOR TRANSITIONS 3„19 L.
uuqi ;;y
lh i; <E: i ji
v; ?rT'11SS C} i No. 2.fO.l U
1.: /o r ,Ardtitects / Planners
WA T A E SERA G U I LD I NG
O I 71' O F V I STA
VISTA, CAL 1 4/R
OOR AND I N O
D ETA S A15
i
WHAM •RUHMAUASSOCWES
5751 Palmer Way, Suite C 3775 Tenth
Street760/CCarlsbad. (A92008.8872 09 501 3669
FAX 76O/931,-8194 FAX: 909 / 684-6276
11/10/2026 C6 179 of 357
29'-O"± /E) CONST.- ANA CONST. 24 GA. PREFORMED -'\ ,r- TOOLED STRUCTURAL NOTES: (Refer to Project Manual for complete specifications.) KEYED JOINT \ / JOINT
r4'-0"
Y 4 METAL STUD
BRACE 0 48" O.C.wo,r TYP. 'TYP.Th' TO ROOF PURLINS i i. CODE: 1994 UNIFORM BUILDING CODE
2. CONCRETE: NORMAL WEIGHT, ASTM A 33, f' c. = 3000psi
MAXIMUM WATER —CEMENT RATIO 0.55
C
re
l rn i R4x4x0 —4 1
I \l
NEW BUILDING - t/l
Ljj 7 N$/FS
1-rt 7,_?-)I
l I!I- ,!-!i-If
CONTROL JOINT 4A5'-0"
W12x14
APP
3 " /
ig 3. REINFORCING SfttL• ASTM A 615, GRADE 60
4. • GEOTECHNICAL: DESIGN SOIL BEARING = 2000PSF (DL+LL) AT 2'-0" MINIMUM EMBEDMENT BELOW LOWEST
FINISH GRADE, ALL FOOTINGS BEAR ON
COMPACTED FILL GEOTECHNICAL
INVESTIGATION BY GEOCON INCORPORATED; •
SAN DIEGO; GA., PROJECT No. 5809- 52-01.
5. EXCAVATION & EXCAVATE & REMOVE UNDOCUMENTED FILL DOWN .
COMPACTED ALL: TO FIRM DECOMPOSED .GRANITE: COMPACT &
MOISTURE CONDITION EXPOSED D.G. SURFACE
TO. 90%- PER ASTM D 1557, PLACE & RECOMPACT
EXCAVATED. MATERIAL .1N 8 INCH LIFTS TO 90% PER
ASTM G 1557 AT 1 TO 3% OVER OPTIMUM MOISTURE
CONTENT. SCREEN REUSED SOILS FIRST TO REMOVE
ALL. ORGANIC MATERIAL.
r
MIN.TYP.STL. BM.k 1CEILINGLINE2) No.8 TEKS31' i
EACH T T
J
L-I__
I
Ii I
SCREWS
4A
C_>7S4x4x1 T54x4x -'4 4 BRACE
ADJACENT16" SO. x 18" DEEPCONTROLLEDN) CONC. SLAB BLOCKOUT 1s1
COMPACTED
FILL 90%
r 4-12 iv
k
A R.41"x3"x0-10"J _
1 v W/(2)- "o ANCHOR / •` R 8x 4 CEILING LINE
MAKE PREUMINARY
EXCAVATION DOWN
SURFACE OF DENSE
DECOMPOSED GRANITE U
BOLTS 0 7"GAGE EMBED COL INEND ( _DETAIL I
I
s
I 8
TO THIS LEVEL 1 NON -SHRINK14x4x »A
4 ` 4 GROUT 1" = 1 -0WELDED)
DETAIL B `
EXISTING I
NEW SLAB I
Sw,
s
i
I
NEW BUILDING
2 — 1 —0
SUPPORT BEAM FOR FUTURE PARTITION in 2 BUILDING B
iA `
I o,r
EXISTING BUILDING f'-
I --
m
o
rt
1 -0 MIN.
t)
r 2x4 TOP PLATES
175
E
L_ I
9" CONC. -SLAB 0
EACH WAY, 1" CLE
3" CLEAR FROM B
GRAVEL, OVER CO
I
GRADE w/#5 012" 0.C.
R FROM TOP OF SLAB &
TTOM, OVER 6" LAYER OF
ROLLED COMPACTED FILL,
r
f` 5 ,_
a-!
O
r
a h
2)
OR
TRACK
18GA DEEP LEG
4,1
END OF
LOW WALL
STRUCTURAL NOTESMIN.4)" 5
I D b -3 HOOP
CROSS WALL TIES
1 12 O.C.
1 1
CONTROLLEDi• i COMPACTED
FILL 0 90%
2x4
STUD
EA.
OR 1 GA. CEE -
W/1 "FLANGES -.
SIDE OF STANCHION. '
STANCHION TUBE
TS 3x3xa : ,16 , _,
TS 3x3x
CLRSTANCHI N
0 i—_1._
1 I
S
44 ~O"
2 PLATE OR TRACK
SURFACE CF DENSE MAKE PRELIMINARY
THRU BOLT X
OP & OTTOMn DETAIL A
DECOMPOSED GRANITE EXCAVATION DOWN L., u •, "
1 = 1'-0"O`TO THIS LEVEL 1°
CONDITION ADJACENT TO EXISTING BUILDING
EXCAVATION AND COMPACTED FILL DIAGRAM 1 TYP.LOW WALL STANCHION DETAIL 4"3 ADD ALTERNATE N;o'.' 2 - NEW SLAB FUTURE TIRE STORAGE BLDG.)i" .
E) CONSTRUCTION TO BE REMOVED (E) CONSTRUCTIONC_TION TO REMAIN 7'-O"t 0"t 5'-6"t 17 --I-g D..J
CG rJ I G G i FOOTING SCHEDULE
L-ff 4 0
ID
54: \I
i
A 3'-0"SQ.12" DEEP (3)-#5 E.W.
FL I
B
L__J
3'-6"SQ.12" DEEP 4)-#5 E.W.
i-
I
43+e 'S+U
SAWCUT CONTROL - y
JOINTS (TYPICAL) \I II
C
J
I-
T-6" SQ.12" DEEP 3)-#5 E.W.
I
1)+6 6Z
o
I
I D 2'-0"SQ.24" DEEP
4)-#4 VERT
3)—#3 TIES
co5
i 8" O.C.
II M I
tai
14 n+
A \
co P
co 116
Z
P
L
I'
I. II i 17 \
I
I
SEE 7-5- FOR CONTINUATION.
1 OUTSIDE FACE OF (E) W COLUMN
TN)7
E) COL.
TO BE
FTG.
REMOVED
I
INSIDE FACE OF STUD WALL
E) COL. I & FTC.r TO REMAIN
TYP.' OF 3)
a
II,1\`m
6" CON CURB - \ S-2„J"P.
II
18 3 TYP. ATSIMiLOWWALL
8 _
P `°
B r81 a•
mil1ra
res,a11-
E) CURB
TO B
I `
I EXISTING
STORAGE
E) CONC.
TO BE
STUD V1(ALL
REMOVED
TIREw/;AREA
SLAB
REMOVED
i
y
I
t
III
I
ii.
I!
I'
1 i
E) CMU CURB
N) CURB &1
20 PARTITION
EXISTING;
STUD WALL
t
GARAGE
i I
I
SlM. 19
O.H. S-2 II1- 19
1 S-2 ;N
DEPRESS SLAB FOR TILE --/
7E CONC. SLAB, CURB
AND STUD WALLIL161'6" _,-
I
D TYP
TP.I TO BE REMOVED
I- t I
J 1 II I 4
P530.70" (DATUM)
17 CONTROL
S-2 5"GONG. SLAB ON GRADE
4 o 18" O.C. EA. WAY
AT MID -DEPTH OF SLAB c
I ;!1----- -JOINTs
I
a
TOR
FUTURE
PARTITION)
1 Nl
1 1* --------- I
E-
4A /hYP.
20t
12x14
BEAM
AB(9 CONC. SLAB ION G ADE W/#5 c 12 O.C.C S-2
E) CURB
j / TO BE
i
I
L _- -_ _
i
r
STUD WALL
REMOVED
1 f-- _ "
ii1,
I1
1 WI
E) CURB & STUD -r-_
WAL . TO REMAIN` 71E) 4x POST T4 REMAIN
TYP. OF 5
N
17 18
iYP
I
ii
EAREACHWAY, 1"
M;3" CLEAR FROM'
GRAVEL, OVER CONTRO
I
I
I
ROM TOP OF SLAB &
M, OVER 6" LAYER OF
LED COMPACTED FILL.
ale-;
I
I
I
6:
I 3 S-2 S-2 A ''TTYP.
I 1
A Al
TYP
i 1LA
Z1--T
JI
J
I
I I N) RETAINING WALL_ I
L J
z..
FOOTING i 8 1
I
CDI
SIM
tea
k I I
21'-0"20'-0"1 i 21'-0" I I 44'-0"t
rts-2
62' -0"8 NE- -I-
t
I
16' -0"± i 7----; (-7-\ I I
J
14- -
t :; F 1
E) CONC. RETAINING WALL & FOOTING
4 0 4 8 16
V` 'r
VERIFY IN FIELD)t
5 DOWELS
16" Q.C.1--1 \
1cill
SCALE:
IIIIIIIIIII
1 8" =1 '--0"
Nt Ec. 3-.31-97 'v.
of. co"
52/
BASE BID ADMINISTRATION BUILDING FOUNDATION/SLAB PLAN 5 ADD ALTERNATE No. 3 GARAGE ALTERATION FLOOR PLAN i „6 Drown by M. OLAGUE
Checked by M. KANDA
DoteQ 5/15/97
Commission ,,
Revisions KANOA MID TSO ASSOCIATES
CONSULTING STRUCTURAL ENGINEERS
NUMM 4 OCIA
trarteres/vtarxe/s WASTEWATERASEWATER SERVICES BUILDING
CITY OF VISTA
VISTA CALIFORNIA1
ADMIN. AND TIRE STORAGE BLDGS.
FOUNDATION /SLAB PLANS A ND '
GARAGE ALTERATION FLOOR PLAN
SSheet Number
S-1
Of Sheets
3775 Tenth Street
1 18 CA 925013669
909 / 684-4664
FA / 684-6276
K A N D A I S O 5, 1 MISSION STREET
SOUTH PASADENA, CA 91030-3035
TEL: cs,83 441-1211
FAX: t 818 441-1011
5751 Palmer Way, State C
9sbadG 920088872
619/438.5899
FAX 619/931-8194
11/10/2026 C6 180 of 357
PP'
1 MAX.4 TRACrt 4
METAL
STUDS
I !
I I 1 ,
j _._ OMIT CONN.
METAL --,,ASS Y, FOR
DECK 10 X 14 GA x 1R-2"OPNGS, UP
16 STUD
GA CEE --16
PLAN
A-1i -24
TYP.
GA GEE STUD -SEE ARCH.
FOR WIDTH
i I iI!
f
4'
WINDOW &
0 6'-0" O.C.TO
SILLS i
PAIR OF #8 WIRE -,. i._._-._I i t ' I( / t V DIAL. BRACES PURLIN / CAD 8'-Cr O.C. MAX. PURLIN
1 2 "WIDE x12 GA.
4 TIGHT
2 No.8 ---..
MIN. SLOPE KS C REWS)TYP.B
TUR,P NS TEKS SCREWS ----„
o,
JAMB ASS'Y. / rsis:a,yi;nflr w.I1I
1 fr A
H D H R CUT PART OF 2—/'0.145 0 SHOT PINS —'— or
HEADER ASS'Y.I TRACK & BEND @ 6" O.C. TYP, AT CONC. !i/FILLED DECK JAMB SECTION®i 1 B I I---- 2 —NO. 8 TEKS
02 1 C
P.M m SCREWS 6" O.C.
METAL STUD
SEE ARCH. PLAN.
FOR SIZE..
TYP.
i
I I
i
I
16 GA DEEP
4 M
d •(2 —No,8 TEKS i 14GA SLIP TRACK --NOTE: DETAIL IS » _, 8 LONG @ 6'--0 0.C.TYP. AT ROOF
7- \ i
TYP,
SCREWS TOP SIMILAR FOR DECKS (4 -TOTAL)
IN
O LEG16GA.. MIN. DEEP TRACK
1 K.- )TYP),XI
1 i 'GA UNPUIGHED
AND BOTTOM
J
WINDOW SILL
ETAI 2-ND0,10 STEMS -T 16 GA DEEP
DEEP LtG TRACK 1 A I" = 1 =- "` ® 6' O.C. (4 -TOTAL0 j LEG TRACK FINIS
CEILING
O
r'7
L STUD -SEE ARCH.
FLANS FOR SIZE c GAGE
1s V 1 2--24 I LEG TRACK ff SILL
16 GA DEEP
LEG TRACK 3$"x16GA
GEE STUD I I NOTES:
SIM.6
P.METAL STUD —
I
1. I J
1. REFER TO ARCH. FLOOR PLAN
FOR LEGEND AND STUD SIZE.I 16 GA GEE
TYPy_ -16 GA DEEP
1 i-24
FOR OPENINGS UP
STUD
TO 4'-0" 1®) FOR OPENINGS
LEG TRACK
UP TO 10'--0 ' C)
BASE TRACK
N
4" TYP.
HEADER SECTION
HEADER AND JAMB CONSTRUCTION 1 STUD WALL FRAMING PARTITION ANCHORAGE 1"4 PARTITION ANCHORAGE " T
f
EDGE NAIL _ _- — DBL. 2x6 TOP PLATE
5 0 12" 0.C.
METAL STUD
SEE ARCH.
FOR SIZE.
0.14" 0
POWER —DRIVEN
FASTENER
32" Q.C.
TYPE S-12PROFILEHEAD
EA. LEG TYP. THRU
CONC. FLOOR
PLAN
AT
LOW
SCREW `
OUT
IR
j
1 I
I
I
i
16 GA DEEP
LEG TRACK
1 tt
2)- #5 CONT.
GROUT ALL CELLS ---
i
i
j _
EACH WAY (TOP \,,
BOIT. T. LAYERS)
c (2) #7 GOVT.
cl
530.65'± ;-' `, j TOP & BOTT. :r-----3"
g
SIMPSON H5
HURRICANE
TIES 0 32 0.C.
3 "± (VERIFY)
E ROOF SHEATHING
T.O.S. A(VARIES)
v ,i f2"
CLR.c,=
f 7 ,-I-+,r;1_+-l"-"-`
N' III1i"115C 24 O.G.j'
4,---'4%
r
9" CONC. -
SLAB ON #5 ® 24" 0.C.i
I
GRAD $
f ..to oSEE }
4"6"GRAVEL
e I
3 STIRRUPS
yi
STIRRUPS `'
i
a
24' G..
2x6 BLK'C,
f.., 18 DETAIL 3r,19
Drawn by M. OLAGUE
Checked by M. KANDA
Date 5/15/97
Commission No.
KANDA TSO
KANDA AND TSO ASSOCIATES
CONSULTING STRUCTURAL ENGINEERS
511 MISSION STREET
SOUTH PASADENA, CA. 91030--3035
TEL: (818) 441-1211
FAX: (818) 441-1011
MNI/ 4111141MAUASSOCIATES
architects / Planners
5751 Palmer Way, Suite C
Cafsbad, CA 92008-8872
6 1 9 / 438.5899
FAX 619/ 931-8194
3775 Tenn Street
Rnverside. CA 92501-3669
909 / 684 1664
FAX 909/684-6/76
WASTEWATER SERVICES BUILDING
CITY OF VISTA
VISTA, CALIFORNIA
ADMINISTRATION, TIRE STORAGE
AND GARAGE BUILDINGS
SECTIONS AND DETAILS
Sheet Number
S-2
Of Sheets
11/10/2026 C6 181 of 357
ABV ABOVE
ABV CLG ABOVE CEILING
AC AIR CONDITIONING
ACD
ACU
AD
AF
AFF
AFS
AHU
AMB
AN
ANV
AP
ARCH
A
ATC
BC
BDD
BFV
BHP
BFP
BEL
BLV
BTU
BTUH
BWV
CC
CI
CFM
CW
CFH
CLG
COMP
CD
CONN
CONT
COP
CO
COTG
CV
CONC
CWR
CWS
DN
DS
DF
DB
DIA
DIFF
DWG
DR
E (NAME)
ESP
EA
EAR
EAT
EER
EF
EJ
ELEC
ENT
EXIST
EL
EXH
F
F
FD
ECU
FLA
FA
FC
FDC
FD
FIN
FLR
FPM
FU
FS
FT
FR
FTR
GA
GAL
GPR
GC
G
GPM
GV
GR
H
HB
HC
HTG
HP
MPR
HPS
HVAC
HW
HWR
HVAC
AUTOMATIC CONTROL DAMPER
AIR CONDITIONING UNIT
ACCESS DOOR
AIR FOIL
ABOVE FINISHED FLOOR
AUTOMATIC FIRE SPRINKLER
AIR HANDLING UNIT
AMBIENT
AT
PIPE ANCHOR
ANGLE VALVE
ACCESS PANEL
ARCHITECTURAL
COMPRESSED AIR
AUTOMATIC TEMPERATURE CONTROL
BALANCING COCK
BACK DRAFT DAMPER
BUTTERFLY VALVE
BRAKE HORSEPOWER
BACKFLOW PREVENTOR
BELOW
BALL VALVES
BRITISH THERMAL UNIT
BTU PER HOUR
BACKWATER VALVE
COOLING COIL
CAST IRON
CUBIC FEET PER MINUTE
COLD WATER
CUBIC FEET PER HOUR
CEILING
COMPRESSOR
CONDENSATE DRAIN
CONNECTION
CONTINUATION
COEFFICIENT OF PERFORMANCE
CLEANOUT
CLEANOUT TO GRADE
CHECK VALVE
CONCRETE
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
DOWN
DOWN SPOUT
DRINKING FOUNTAIN
DRY BULB
DIAMETER
DIFFUSER
DRAWING
DRAIN
EXISTING PIPE
EXTERNAL STATIC PRESSURE
EXHAUST AIR
EXHAUST AIR REGISTER
ENTERING AIR TEMPERATURE
ENERGY EFFICIENCY RATIO
EXHAUST FAN
EXPANSION JOINT
ELECTRICAL
ENTERING
EXISTING
ELEVATION
EXHAUST
FIRE
DEGREES FAHRENHEIT
FLOOR DRAIN
FLOOR CLEANOUT
FULL LOAD AMPERAGE
FREE AREA
FLEXIBLE CONNECTION
FIRE DEPARTMENT CONNECTION
FIRE DAMPER
FINISHED
FLOOR
FEET PER MINUTE
FIXTURE UNITS
FLOOR SINK
FEET
FROM
FLUE THROUGH ROOF
GAUGE
GALLON
GAS PRESSURE REGULATOR
GAS COCK
GAS - LOW PRESSURE
GALLONS PER MINUTE
GATE VALVE
GRADE
HIGH
HOSE BIBB
HEATING COIL
HEATING
HORSEPOWER
HIGH PRESSURE RETURN
HIGH PRESSURE STEAM
HEATING, VENTILATING AND AIR-CONDITIONING
HOT WATER
HOT WATER RETURN
AB 3
V AC
REVIATI
A \I
N S
D L U v B I
AND S Y N BOL LISTS
ABBREVIATIONS
HWS HOT WATER SUPPLY
IE
ID
IPS
INVERT ELEVATION
INSIDE DIAMETER
IRON PIPE SIZE
KW . KILOWATT
L
LRA
LAT:
LBS
LD
LDB
LF
LPR
LPS
LVG
LAV
LWT
MAV
MAX
MB
MBH
MU
MPG
MIN
MS
MPR
MPS
MU
MV
MVD
MZ-AHU
NC
NIC
NO
NO.
NPSH
NTS
OBD
OAI
OD
OPW
OSA
OV
OPNG
Ply
PF
PG
PH
POC
PRESS
PRV
PS
PSI
PSIA
PS1G
PT
PTR
PVC
R
RLA
RA
RAR
RCT
REQ'D
RD
REG
RI&C
RHC
RHB
RPM
RS
RV
SA
SAD
SAR
SD
SEER
SENS
SF
SHR
SMACNA
SHT
S
SOV
SP
SPEC
LONG
LOCKED ROTOR (AMPERAGE)
LEAVING AIR TEMPERATURE
POUNDS
LINEAR DIFFUSER
LEAVING DB TEMPERATURE
LINEAR FEET
LOW-PRESSURE RETURN
LOW-PRESSURE STEAM
LEAVING
LAVATORY
LEAVING WATER TEMPERATURE
MANUAL AIR VENT
MAXIMUM
MIXING BOX
THOUSAND BTU PER HOUR
MAKEUP AIR
GAS - MEDIUM PRESSURE
MINIMUM
MOP SINK
MEDIUM PRESSURE RETURN
MEDIUM PRESSURE STEAM
MAKE-UP WATER
MOTOR OPERATED VALVE
MANUAL VOLUME DAMPER
MULTIZONE AIR HANDLING UNITS
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NUMBER
NET POSITIVE SUCTION HEAD
NOT TO SCALE
OPPOSED BLADE DAMPER
OUTSIDE AIR INTAKE
OUT SIDE DIAMETER
OPERATING WEIGHT
OUTSIDE AIR
OUTLET VELOCITY
OPENING
POST INDICATOR VALVE
PERFORATED (FACE)
PRESSURE GAUGE
PHASE (ELECTRICAL)
POINT OF CONNECTION
PRESSURE
PRESSURE REDUCING VALVE
PRESSURE SWITCH
POUNDS PER SQUARE INCH
PSI ABSOLUTE
PSI GAUGE
PLUGGED TEE
PRESSURE -TEMPERATURE RELIEF VALVE
POLYVINYL CHLORIDE PIPE
RISE
RATED LOAD (AMPERAGE)
RETURN AIR
RETURN AIR REGISTER
RECTANGULAR (FACE)
REQUIRED
ROOF DRAINS
REGISTER
ROUGH -IN AND CONNECT
REHEATING COIL
RECESSED HOSE BIBB
REVOLUTIONS PER MINUTE
REFRIGERANT SUCTION LINE
RELIEF VALVE
SUPPLY AIR
SUPPLY AIR DIFFUSER
SUPPLY AIR REGISTER
STORM DRAIN
SEASONAL ENERGY -EFFICIENCY RATIO
SENSIBLE
SUPPLY FAN
SENSIBLE HEAT RATIO
SHEET METAL & AC NATIONAL ASSOCIATION
SHEET
SINK
SHUT OFF VALVE
STATIC PRESSURE
SPECIFICATION
SG SQUARE (FACE)
SQ. FT. SQUARE FOOT
SS SERVICE SINK
STR STRAINER
TYP
TC
TCP
TDH
TEMP
TP
TYPICAL
TEMPERATURE CONTROL
TEMPERATURE CONTROL PANEL
TOTAL DYNAMIC HEAD
TEMPERATURE
TRAP PRIMER
TCV
TD
TEFC
TG
TH
TV
TW
UC
UH
UL
UN
UTR
UV
V
VAC
VAV
VD
VCP
VTR
W
W/
W-CLR
WC
W/O
WB
WBT
WG
WMS
WP
AUTOMATIC TEMPERATURE CONTROL VALVE
TRANSFER DUCT
TOTALLY ENCLOSED FAN -COOLED MOTOR
TRANSFER GRILLE.
THERMOMETER
TURNING VANES
THERMOMETR WELL
URINAL
UNDERCUT (DOOR)
UNIT HEATER
UNDERWRITERS LABORATORY
UNION
UP THRU ROOF
UNIT VENTILATOR
VENT OR ATMOSPHERIC RELIEF
VACUUM
VARIABLE AIR VOLUME
VOLUME DAMPER
VITRIFIED CLAY PIPE
VENT THRU ROOF
WIDE OR WASTE
WITH
WATER COOLERS
WATERCLOSET
WITHOUT
WET BULB
WET -BULB TEMPERATURE
WATER GAUGE
WIRE MESH SCREEN
WORKING PRESSURE
1-W ONE WAY (PATTERN)
2-V TWO WAY (PATTERN)
3-W THREE WAY (PATTERN)
4-W FOUR WAY (PATTERN)
GENERAL NOTES
1. ALL DUCT DIMENSIONS ON DRAWINGS TO BE INSIDE CLEAR.
2, ALL ROOM THERMOSTATS TO BE MOUNTED 5D-0' ABOVE FINISH FLOOR.
3. ALL INDIVIDUAL BRANCH SUPPLY, RETURN, OUTSIDE AIR, ECT, DUCTS SHALL BE EQUIPPED WITH.A MANUAL VOLUME DAMPER.
4, ALL SQUARE ELBOWS TO BE PROVIDED WITH TURNING VANES.
5. TO DETERMINE THE EXACT NUMBER AND LOCATION OF FUSIBLE LINK FIRE
DAMPERS THAT MAY BE REQUIRED, THE CONTRACTOR SHALL REVIEW THE
ARCHITECTURAL DRAWINGS WHICH INDICATE THE LOCATION OF FIRE RATED
WALLS, PARTITIONS AND CEILINGS,
6, CO-ORDINATE LOCATION. OF CEILING DIFFUSERS, REGISTERS AND GRILLES
WITH ARCHITECTURAL REFLECTED CEILING PLAN,
7, CONTRACTOR SHALL CO-ORDINATE MOUNTING HEIGHT OF ALL DUCTS WITH
RECESSED LIGHTING FIXTURES, WHERE NOTED ON DRAWINGS OR REQUIRED, DUCTS SHALL BE RUN BETWEEN LIGHTING FIXTURES.
8, FLASHING AND COUNTERFLASHING FOR MECHANICAL WORK SHALL BE MADE WATER PROOF.
9. THESE DRAWINGS AND SPECIFICATIONS DO NOT INCLUDE NECESSARY COMPONENTS FOR CONSTRUCTION SAFETY.
10. SYMBOLS AND ABBREVIATIONS ARE SHOWN FOR REFERENCE) NOT ALL SYMBOLS AND ABBREVIATIONS MAY BE USED.
11. ALL NOTES ON THIS SHEET REMAIN PART OF THE CONTRACT DOCUMENTS,
12. ASBESTOS OR HAZARDOUS WASTE- IT IS UNDERSTOOD AND AGREED THAT. THIS
CONTRACT DOES NOT CONTEMPLATE THE HANDLING OF ASBESTOS OR ANY
HAZARDOUS WASTE MATERIAL IF ASBESTOS OR ANY HAZARDOUS WASTE MATERIAL IS ENCOUNTERED, NOTIFY THE OWNER IMMEDIATELY. DO NOT DISTURB, HANDLE OR ATTEMPT TO REMOVE..
13. FOR SERVICE CONNECTIONS TO INDIVIDUAL FIXTURES REFER TO SPECIFICATIONS.
14. ALL WASTE AND VENT PIPING OCCURRING IN DEMOUNTABLE OR MIN-
IMUM THICKNESS WALLS SHALL BE TYPE DWV COPPER FROM FINISH
FLOOR TO ABOVE ROOF,
15. FOR SERVICE CONNECTIONS TO INDIVIDUAL FIXTURES REFER TO SPECIFICATIONS.
16, ALL HOSE BIBBS SHALL BE INSTALLED 18' ABOVE FINISH FLOOR OR GRADE, UNLESS OTHERWISE NOTED.
17. VENTS THRU ROOF SHALL BE INSTALLED 10'-0' FROM OR TERMINATED 3'-0' ABOVE ANY FRESH AIR INTAKES,
18. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF ALL CEILING
ACCESS PANELS WITH THE ARCHITECTURAL REFLECTED CEILING PLAN AND THE ELECTRICAL LIGHTING LAYOUT.
19, EXACT LOCATIONS AND MOUNTING HEIGHTS OF PLUMBING FIXTURES
SHALL BE OBTAINED FROM THE ARCHITECTURAL DRAWINGS,
20. CONNECTION BETWEEN INCOMPATABLE MATERIALS ABOVE GRADE AND INSIDE BUILDING SHALL BE MADE WITH TWO (2) DIELECTRIC UNIONS SEPARATED BY A 12' SECTION OF RED BRASS PIPE.
21. ALL CUTTING OF EXISTING PAVINGS, WALKS AND/OR FLOORS SHALL BE BY MACHINE SAW CUTTING. HOLES FOR PIPING IN CONCRETE WALLS OR FLOORS SHALL BE DONE BY CORE DRILLING EQUIPMENT.
22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND REPAIR-
INF ALL PAVED AREAS WHICH ARE EXCAVATED AND/OR DAMAGED BY HIS OPERATIONS.
23. ALL CONNECTIONS TO EXISTING SERVICES SHALL BE MADE SUCH THAT INTERRUPTION TIME WILL BE AS SHORT AS POSSIBLE. THE CON-
TRACTOR SHALL GIVE THE OWNER'S REPRESENTATIVE SUFFICIENT
NOTICE OF SUCH INTERRUPTION AND THE ACTUAL SHUT -DOWN TIME SHALL BE AT A TIME DESIGNATED BY THE OWNER'S REPRESENTATIVE. 24, ALL SHUTOFF VALVES, OUTSIDE THE BUILDINGS, SHALL BE IN CON-
CRETE YARD BOXES WITH THE NAME OF THE SERVICE CONSPICUOUSLY CAST IN THE COVER.
SEISMIC R E STRAIN T
1. ALL MECHANICAL EQUIPMENT SHALL BE BRACED OR ANCHORED
TO RESIST A HORIZONTAL FORCE ACTING IN ANY DIRECTION
USING THE FOLLOWING CRITERIA!
EQUIPMENT ON GRADE; 20X
EQUIPMENT ON STRUCTURE: 30%
FOR FLEXIBLY MOUNTED EQUIPMENT USE 4 X THE ABOVE VALUES, AND FOR SIMULTANEOUS VERTICAL FORCE USE 1/3 X HORIZONTAL FORCE, THE ABOVE VALUES ARE FOR AN IMPORTANCE FACTOR, I=1.0
AND SEISMIC ZONE, Z=0.4 ,
WHERE ANCHORAGE DETAILS ARE NOT SHOWN ON THE DRAWINGS THE
FIELD INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE
MECHANICAL ENGINEER AND THE FIELD ENGINEER OF THE OFFICE
OF THE STATE ARCHITECT,
2. DUCTWORK & PIPING RESTRAINT SHALL BE IN ACCORDANCE WITH
SMACNA' GUIDELINES FOR RESTRAINT OF MECHANICAL SYSTEMS, COORDINATION:
1. THESE DRAWINGS ARE DIAGRAMATIC AND SHOW IN GENERAL WHERE THE DUCTWORK, PIPING AND OTHER WORK SPECIFIED IN THE 15000 SEC-
TIONS OF THE SPECIFICATIONS IS TO BE LOCATED, THE DRAWINGS DO
NOT NECESSARILY INDICATE ANY AND ALL OFFSETS AND CONFIGURATIONS
REQUIRED FOR COORDINATION WITH THE SPACE REQUIREMENTS OF OTHER
TRADES, THE CONTRACTOR IS RESPONSIBLE FOR THE CORRECT PLACING,
LOCATION, AND CONNECTION OF THIS WORK IN RELATION TO THE WORK
OF OTHER TRADES,
THE CONTRACTOR SHALL EXAMINE ALL MECHANICAL, ARCHITECTURAL,
STRUCTURAL, ELECTRICAL AND OTHER DRAWINGS THAT HAVE BEEN PRE-
PARED FOR THIS PROJECT, AND ACCEPT SUCH CONDITIONS, AND MAKE
ALLOWANCES FOR THEM IN PREPARING THE BID,
PLUMBING SYMBOLS.
IM _
T
ri _
3 SD
OD
CWV
AW
AV
CD _
PL _
ECW
EHW
F
G _
EG _
MPG _
EMPG
PIPING BRANCH
PIPE DROP
PIPE RISE
RISER OR DROP
BRANCH - TOP CONNECTION
BRANCH - BOTTOM CONNECTION.
SHUT OFF VALVE IN YARD BOX
UNION (SCREWED)
PLUGGED TEE
FLANGED CONNECTION
CAP ON END OF PIPE
VALVE IN RISER
GATE VALVE OR SHUT-OFF VALVE
CHECK VALVE, SWING OR LIFT
THERMOMETER AND WELL
PRESSURE GAUGE
GAS PRESSURE REGULATOR
FLOOR CLEANOUT OR CLEANOUT TO GRADE
CLEANOUT IN YARD BOX - TRAFFIC WEIGHT
WALL CLEANOUT
HOSE BIBB WITH VACUUM BREAKER
SANITARY SEWER SOIL, OR WASTE.
EXISTING SANITARY SEWER, SOIL, OR WASTE
SANITARY VENT
STORM DRAIN
OVERFLOW DRAIN
COMBINATION WASTE AND VENT
ACID WASTE
ACID VENT
CONDENSATE DRAIN
PRIME LINE
DOMESTIC COLD WATER
EXISTING DOMESTIC COLD WATER
DOMESTIC HOT WATER
EXISTING DOMESTIC HOT WATER
HOT WATER RETURN
FIRE PROTECTION WATER SUPPLY
GAS - LOW PRESSURE
EXISTING GAS - LOW PRESSURE
GAS - MEDIUM PRESSURE
EXISTING MEDIUMM PRESSURE GAS
MECHANICAL
N
C
N O T E
OR
OR
OR
OR
OR . I
OR
OR
OR
OR
OR
OR
OR
OR
OR
N t IY-
1----
3 _
SYMBOLS
RETURN AIR DUCT UP
SUPPLY AIR DUCT UP
EXHAUST AIR DUCT UP
RETURN AIR DUCT DOWN
SUPPLY AIR DUCT DOWN
EXHAUST AIR DUCT DOWN
ELBOWS WITH TURNING VANES
TEE DUCT WITH TURNING VANES
DUCT WITH ACOUSTICAL LINING
DUCT DROP
DUCT RISE
TRANSITION SQUARE TO ROUND
TRANSITION SQUARE TO SQUARE / ROUND TO ROUND
FLEXIBLE DUCT
FLEXIBLE CONNECTION
RADIUS ELBOW
SUPPLY AIR RECTANGULAR-CEILING.DIFFUSER
RETURN AIR CEILING REGISTER / GRILLE
EXHAUST AIR GRILLE
VERTICAL DUCT DROP
VERTICAL DUCT RISE
SIDE WALL REGISTER SUPPLY AIR
SIDE WALL REGISTER RETURN AIR
FIRE DAMPER
AUTOMATIC CONTROL DAMPER
COMBINATION OF SMOKE AND FIRE DAMPER
MANUAL VOLUME DAMPER
DOOR LOUVER
UNDERCUT (DOOR) .
THERMOSTAT
THERMOSTAT # CORRESPONDS WITH UNIT NUMBER
BY-PASS TIMER
NIGHT THERMOSTAT
RETURN AIR. THERMOSTAT
SMOKE DETECTOR
TIME SWITCH
DIAMETER / ROUND
SQUARE FEET
CFM
ZONE CONTROL DAMPER
BY-PASS DAMPER
1. TEMPERATURE THERMOSTAT. TEMPERATURE RANGE 55 49F TO 85 °F SEQUENCE HEATING AND COOLING, ADJUSTABLE TO 10 ck BETWEEN HEATING AND COOLING CAPABALITY TEl TERMINATE ALL HEATING AT NG MORE THAN 70 GF AND TERMINATE ALL COOLING AT NOT LESS THAN 78 ° F
w
tfr
Sheet NumberDrawnbyDL.N
Checked by DLN
late ARIL iQg1
Commission No.
Revisions
NACK
ENGINEERING
1384 Woodview Court
Oceanside, CA 92056
619) 940-9683
FAX (619) 941-7431
E—mail: dinack®aol.cam
RUHNAti.°Rh MAUASSOCG47ES
Architects /Planners
5751 Palmer Way, &Ike C
619/43858999200943872
FAX 619/931.8194
3775 Tenth Street
Riven ie CA 92501.8669
90916811661
FAX 904/6844176
1 ASTE1A1ATER SERVICES E3U{L.r;IN&
GIT`r' OF VISTA
VISTA, GAL.ITORNIA
A V) AT I ONS
ANA S`" MS15OJ.S M-0.1
Of • Sheets
11/10/2026 C6 182 of 357
AIR ONDITIONEi SCHEDULE
UNIT SYMBOL AC -1 AC -2 AC -3
LOCATION ROOF ROOF ROOF
MANFACTURER CARRIER CARRIER CARRIER
MODEL 48HJD005 48SX024040 48H30007
TYPE GAS/ELEC GAS/ELEC GAS/ELEC
INDOOR FAN - CFM 1400 810 1800
OUTSIDE •AIR - CFM 185 150 710
EXTERNAL S.P., -- "WG 0.5 0.5 0.5
INDOOR FAN HP / RPM 0.5 / 891 0.25 / 1075 1.0 / 1109
EVAP. EAT - °F -- DB 79.6 81.2 84.3
EVAP. EAT - °F - WB 64.4 65.2 66.3
COND. EAT - OF - DB 95.5 93.4 95.5
COOLING CAPACITY - MBH 44.98 22.72 73.98
SENSIBLE CAPACITY - MBH 34.87 1817 59.82
HEATING INPUT--MBH 72 40 72
FILTER TYPE DISPOSABLE DISPOSABLE DISPOSABLE
COMPRESSOR INPUT -KW 3.63 2.19 5.53
COMPRESSOR NO./RLA (EA)1 / 133 1 / 12.9 1 / 20.5
OUTDOOR FAN MOTOR NO./FLA (EA)1 / .7 1 / 1.4 1 / .1.4
INDOOR FAN MOTOR FLA 4.9 2 5.8
POWER EXHAUST FAN MOTOR FLA NA NA NA
COMBUSTION FAN MOTOR FLA NA NA NA
MCA / MOCP 22.5 / 30 19.5 / 30 32.8 / 40.
MIN. EER / SEER 13.00 12.00 11.00
MIN. AFUE 82 78.5 82
VOLT - PHASE 208 - 30 208/230 - 10 208 - 30
OPERATING WEIGHT LBS 950 600 1000
CURB TYPE PRE-FAB -PRE-FAB PRE-FAB
REMARKS:
EXHAUST FAN SCHEDULE
UNIT SYMBOL EF-1 & EF-2 EF-3 EF-4
LOCATION ROOF ROOF ROOF
MANUFACTURER COOK COOK COOK
MODEL 70HLC15DH 12OHLC-B 165HLC-B
TYPE LOW CONTOUR LOW CONTOUR LOW CONTOUR
SERVICE EXHAUST EXHAUST EXHAUST
FAN - CFM 150 650 1200
EXTERNAL S.P. - "WG 0.25 0.25 0.25
FAN MOTOR - HP / RPM 0.05 / 1650 167 / 859 167 / 606
MOTOR DRIVE DIRECT BELT BELT
OUTLET VELOCITY - FPM 372 684 814
TIP SPEED - FPM 3023 2698 2617
DISCHARGE NA NA NA
WHEEL TYPE CENT CENT CENT
VOLTS - PHASE 115 - 10 115- ' 10.115 - 10
CURB TYPE PRE-FAB PRE-FAB PRE-FAB
OPERATING WEIGHT LBS 175 215 250
REMARKS:
3/4" GAS WITH SOC
UP THRU ROOF TO E
A/C UNIT
3/4" CD WITH APPROVED
TRAP AND VENT
1/2" CW DOWN TO +12" WITH
SOV, RI&C TO REFRIG.
WCG (TYP)
3/4=.
4 „ --t
COTG ,`
r- 3/4" CD SPILL
INTO ROOF GUTTER
1 3/4" CD
ON ROOF
3/4"
I
G
WC o -
TYP)
4"
3/4" CD
ON ROOF
3/4" CD WITH APPROVED
TRAP AND VENT
3/4„ t I 1 1 ,>
3/4" GAS DOWN TO RANGE _ 13/4
WITH SOC, RI&C
G GG G
3/4" _- 3/4,
N>*,f-
i
G
3/4" GAS WITH SOC
UP THRU ROOF TO
A/C UNIT
3/4"
2"
G G
3/4" CD WITH APPROVED ---
TRAP AND VENT
3/4" CD --
ON ROOF
CD
3/4" -- I
3/4" GAS UP THRU
ROOF WITH SOC
CONNECT TO
A/C UNIT
3/4"
3/4" CD
SPILL INTO
ROOF GUTTER
PLUMBING- FLOOR PLAN
3/4'
3/4"
3/4"
et
3" / 4" VENT THRU ROOF
G
TYP-2)
SHUT OFF VALVE IN YARD BOX
COTG
4"
3"
1 1-1/4" GAS UP IN WALL TO
ABOVE CEILING
GAS PRESSURE REGULATOR
3/4" MPG WITH SOC UP TO
ABOVE GRADE
1.1/4„
2-1/2"
1-1/4".
FCO (m'P)
6"0 FLUE THRU ROOF
1-1/2"
1-1/2" CW AND 1-1/2" HW WITH SOWS . AND
1" GAS WITH SOC DOWN TO WATER
HEATER
18x14 RAG
0 CFM
22x22 SAD
600 CFM
20x20 RAG
530 CFM
140
160
16x16 SAD
315 CFM
16x16 RAG
I 315 CFM
14x8 TRANSFER =»JCT WITH (2)
16x16 RANSFER GRILLES
I 8x''8 SAD
O CFM •
18x12
18EAG-r
26x12
3/4" GAS DOWN TO DRYER
WITH SOC, RI&C
1/8"=1'-0"
Yard Box : Brooks Products Model No. 3—RT with the words "Water", "Gas", or "Sewer" cast in top of cover as required.
Expansion Tank — Item ET -1: Zurn Model No. •WXT-1 Q, 5 gallon tank, operating weight = 75 lbs.
Floor Sink — FS -1: J. R. Smith Fig. No. 3120 12" x 12" floor sink, cast iron flanged receptor with acid resistant coated interior and nick& bronze rim and secured grate, Aluminum dome bottom strainer.
Floor Drain — Item FD -1 : J. R. Smith Fig. 2O10 —A or Zurn Z415 —B adjustable floor drain with cast iron body, damping collar and 5" round polished nickel —bronze strainer with square holes.
Provide trap primer tapping.
Electric Water Cooler — Item EWC-1: Haws "Barrier --Free" No. HWCF8-2 heavy gauge stainless steel with No. 4 satin finish, heavy gauge galvanized steel mounting con with pre —drilled mounting holes and plumbing openings. One piece polished chrome —plated, shielded, anti —squirt angle stream bubbler. Self closing, polished chrome —plated push bars for water control. With automatic stream height regulator, all copper evaporator/chiller, positive sensing thermostat. Unit bearing self—lubricating fan motor, and copper/aluminum condenser.
Shower — Item SH-1: Bradley Corporation No. HN-20O-VL-SL-EF-CS preassembled wall unit to include No. 478 Equa--Flo pressure balancing valve with integral stops, hand held 60"hose shower head with bracket, diverter valve and soap container in panel with liquid soap valve. Barrier —free folding seat with 1-3/4? thick polyurethane foam cushion and 15 gauge vinyl cover. Include floor drain FD -1.
Sink — Item S-1: Elkay Model LRAD-1918-55-1, 18 gauge, Type 302 18-8 nickel bearing stainless steel single compartment sink, size 19" x 18" x 5-1/2" deep, with fitting ledge and Jiffy Clamps", single hole punch, LK-99 basket strainer with 1-1/2" tailpiece; L.A. Pattern cast brass "P" trap; "Speedway" supplies with loose key angle stops. Chicago Faucet Cornpany No. 50—E3 Hi—Lite combination sink faucet with No. GN-2A—E3 rigid/swing, convertible gooseneck spout, No. E3 Soft --Flo aerator and No, 317 4" wristblade handles.
Sink — Item S-2: Elkay Model LRAD-3319-55-3, 18 iauge, Type 302, 18-8 nickel bearing stainless steel double compartment sink, overall size 33 x 19" x 5—1/2" deep, 7/16" drop ledge with a raised faucet deck, three hole punch, (2) LK-99 basket strainers with 1-1/2" tailpiece; L A. Pattern cast "P" trap; Speedway supplies with loose key angle stops, Chicago Faucet Company No. 201 Hi—Lite concealed sink fitting No. L8 8" swing spout, No. E3 Soft —Flo Aerator and No. 317 4" wristblade handles. Waste King No. SS -5000, "Super Hush" garbage disposer, 115V, 1 phase, 1/2 HP,
Lavatory — item L-1: American Standard "Oval Horizon Countertop" lavatory No. 3303.013, acid --resisting enameled cast iron, front overflow, self —rimming. Chicago Faucets No. 802A Hi—Lite centerset lavatory fauoet with #317 handles, 4" wristblade handles, 4" spout and E12 Soft —Flo, No 327 P.O. Plug with 1-1/4" tailpiece and nonremovable strainer.
Water Closet — Item WC -1: American Standard "Water Saver Afwall 1.6" 2257.103 1.6 —gallon per flush, siphon jet, elongated bowl, vitreous china off the floor water closet with 1-1/2" top spud.
Beneke 527 —SS open front white seat with "Perma—Bumper" and self—sustaining check hinge, Sloan "Royal" 1 1 1--1.6—YO water saving flush valve with vacuum breaker, screwdriver stop and seat bumper. J. R. Smith or Zurn combined wall closet fitting and chair carrier. 14x8 TRANSFER DUCT WITH (2)
16x16 TRANSFER . GRILLES
18x18 RAG
460 CFM
20x20 SAD
460 CFM
16x16 SAD
90 CFM
TYP--2)
20x20
14x14 SAD
115 CFM
18x18 SAD
375 CFM
14x14 RAG
155 CFM
12x8
14x14 SAD
230 CFM
18x18 EAR
400 CFM ,---
TYP - 2) i !!I jrLW -_J
eL
04 18x18 EAR
400 CFM _.--
100 100
18x18 RAG
505 CFM
120 i 120
24x24
18x18 EAR
300 CFM
18x18 EAR
350 CFM
14x14 SAD
270 CFMI
18x12
126x12
18x12
18x18 SAD
370 CFM
CV\
2 /
HVAC FLOOR PT,AN
18x18 EA DUCT THRU
ROOF, TANSITION TO
14x14, CONNECT TO
14x14 EAG, 150 CFM
TIME CLOCK
12x8 TRANSFER DUCT
WITH (2) 14x14
TRANSFER GRILLES
18x18 EAG
10x6 TRANSFER DUCT
WITH (2) 12x12
TRANSFER GRILLES
12x6 TRANSFER DUCT
WITH (2) 14x14
TRANSFER GRILLES
14x14 SAD
410 CFM
12x8 TRANSFER DUCT
WITH (2) 14x14
TRANSFER GRILLES
18x18 EA DUCT THRU
ROOF, TANSITION TO
14x14, CONNECT TO
14x14 EAG, 150 CFM
1/8"=1'--0"
Urinal — Item U-1: American Standard "Ailbrook 1.0 Urinal", No. 6541.132 vitreous china water saver siphon jet urinal with flushing rim, 1-1/4" inlet spud, outlet connection threaded 2" inside, wall hanger. Sloan "Royal", No. 186—YB-1 Quiet Exposed Urinal Fiushometer, chrome plated, screwdriver Bak—Chek angle stop with protective cap, adjustable tailpiece, vacuum breaker flush connection and spud coupling. Install at handicap height where indicated on the architectural drawings.
Sink — Item S-3: (2) American Standard "Lake" No. 7602.055 24x20 single compartment, acid resistant, enameled cast iron laundry sinks No. 7602.030 single black angle iron supporting frame No. 4141.085 faucet for exposed back mount, renewable sterns and seats, 5-5/8" swing spout, aerator with 2.5 GPM flow restrictor, 1/2" union couplings, soap dish and 4" wristblade handles; chrome finish No. 4362.026 1-1/2" tailpiece,
E) BELL & GOSSETT SERIES "PR", 5 GPM, CIRCULATING PUMP, 15 FE HEAD, 50 LBS, 115V-10
A.O. SMITH BTC-250 WATER HEATER, 250 CFH INPUT, 100 GALLON STORAGE, 295 GPH 0807 RISE, 1200 LBS.
Drawn by DLN
Checked by DLN
Date APRIL Ieidl
Commission No.
A
Revisions Ali
LACK
ENGINEERING
1384 Wood* Court
Oceanside, CAw 92056
619) 940-9683
FAX (619) 941-7431
E—mail. dlnack®aoi.corr
Architects /Flames
i,4ASTE CIA I ER SE / l
VISTAC/I i OF Y I S' f f t
I T C !
Y 1 S! A, G,j... 1 w +N 1VISTA,
Es LJ I L I HVAC AN 17L .JM51. \
i Mt1
COSZ Sheet Number
Of Sheets
Rtit11116W aREIHNAU ASSOCIATES 'f'1/
r
3775 Tenth SVeat
939/ 681 1664
FAX 909/684-6276
9 5751 Palmer My. Sale
9 /4385699brcaryr sn
Fiat 619/931-8194
I ; l
11/10/2026 C6 183 of 357
BUILDING TIME
SWITCH (TS —HP)
24V CONTROL CIRCUIT
CONTROL. TRANSFORMER
BY MECHANICAL
ME
24V
Ei
120V-10
M
R -
FLOW SWITCH
TEMPERATURE SENSOR
TS —L0,23 ° RANGE)
TEMPERATURE SENSOR
TS --HI,12° RANGE)
BUILDING TIME SWITCH
NOT TO SCALE
120 V -- I
NT
ROOM THERMOSTAT
M
M
BY—PASS TIMER
0-1 HR.)
PACKAGE
M
SEE EQUIP. SCHEDULE
FOF VOLTAGE Sc PHASE
TIME SWITCH
THERMOSTAT POWER
FROM HEAT PUMP
QUANTITY AS REQ'D)
NOTES:
1. NIGHT THERMOSTAT (NT)= HONEYWELL MODEL T42A W/ KIT
FOR HORIZ MOUNTING W/ MODEL TG501A OFAQUE BEIGE
2. ROOM THERMOSTAT = HONEYWELL MODEL T874A1010 W/
0674E1049 (SYSTEM = OFF/ HEAT / COOL / AUTO -
FAN = ON / AUTO ) AND WITH MODEL TG504A1025
LOCKING GUARD WITH BLANK COVER.
UNIT CONTRO L
NOT TO SCALE
NOTE TO DESIGNER:
1. FOR A/C UNIT ABOVE 2000 CFM SEE DIAGRAM C-10.1.
2. CHECK AND CORRECT THE VOLTAGE .
TYP, FOR 120V, ONLY -
HIGHER VOLTAGES WILL.
REQUIRE A SEPERATE
SWITCH BY ELECT.
EXHAUST FAN INTER-
LOCKED W/ LIGHT
SWITCH UNLESS OTHER-
WISE NOTED
ROOM THERMOSTAT
HONEYWELL MODEL T40518
W/ 60 - 100 SCALE
RANGE SET 90 F.,
TG5O1A LOCKING GUARD
16 F.L.A. + 12OV.
STAT MAKES ON TEMT.
RISE)
GENERAL EXHAUST FAN
NOT TO SCALE
TOILET OR STORAGE
EXHAUST FAN
TYP I CAL)
CONFRENCE ROOM
EXHAUST FAN
TYPICAL)
ELECTRICAL ROOM
EXHAUST FAN
TYPICAL)
FIRE DAMPER (WHERE PENETRATING
A FIRE SEPERATION WALL)
ELBOW WITHOUT TURNING VANE
TYPICAL )
FOR ORIENTATION OF BOOTS
SEE FLOOR PLAN 2L
TRANSFER AIR GRILLE
FIRE RATED WALL (WHERE INDICATED
ON ARCHITECTIRAL PLANS)
3"ACOUSTIC LINING
TOP ONLY)
1 " ACOUSTIC LINING
CEILING OR WALL
NOT TO SCALE
TRANSFER DUCT
CONTROL LEGEND
ME
H
0 A
MOTOR
MOTOR STARTER
RELAY
FURNISHED AND INSTALLED IN ELECTRICAL WORK .
FURNISHED AND INSTALLED IN MECHANICAL WORK
FURNISHED & INSTALLED BY MECH. WIRED BY ELECT.
MANUAL. (H.O.A.) SWITCH .
OL OL OL
If OVERLOAD CONTACTOR
NORMALLY CLOSED CONTACTOR .
CONTROL DIAGRAM NOTES:
MS
OR NT
P
1 DUE TO THE VARIATION OF CONTROL WIRING REQUIRED BY DIFFERENT MFG'S.
OF THE SAME TYPE OF EQUIPMENT, ADDITIONAL CONTROL DEVICES AND / OR
WIRING NOT SHOWN ON THESE CONTROL DIAGRAMS MAY BE NECESSARY TO
CONTROL THE EQUIPMENT TO THE FULL INTENT OF BUILDING CONTROL DIAGRAMS SHOWN ON THIS SHEET. AND OUTLINED IN THE SPECIFICATIONS.
2. ALL LOCKING GUARDS ARE TO BE KEYED ALIKE
3. ALL CONTROL WIRING FURNISHED 8c INSTALLED BY MECHANICAL SHALL BE RUN IN METAL CONDUIT. FOR SPECIFIC TYPE OF METAL CONDUIT REQUIRED SEE
ELECTRICAL SECTION OF SPECIFICATIONS AND THE LATEST EDITION OF THE NATIONAL ELECTRIC CODE (N. EC.).
NORMALLY OPEN CONTACTOR .
AUXILIARY CONTACTORIN MOTOR STARTER P-1
BY PASS TIMER
SMOKE DETECTOR
NIGHT THERMOSTAT
LINE VOLTAGE WIRING
LOW VOLTAGE WIRING
ROOM/MANUAL ON -OFF SWITCH
PNEUMATIC PIPING
PNEUMATIC CONTROL AIR
12 GAUGE GALVANIZED
HANGER SUPPORT ONE
REQUIRED EACH CORNER FOR
4) FOUR TOTAL
PROVIDE DIAGONAL LATERAL _
RETENTION RESTRAIN-
12 GAUGE GALVANIZED
WIRE -- ONE REQUIRED EACH
CORNER FOR (4) FOUR TOTAL
PLENUM WITH 1" ACOUSTICAL
LINING (TYP.)
SCREW AT CORNER
TILE ON GYPSUM BOARD
SURFACE LAY -IN
1 TOP DUCT CONNECTION - SIDE
CONNECTION MAY BE USED ONLY
WHERE ATTIC SPACE WILL NOT
PERMIT TOP CONNECTION
CLAM PING STRAP (WIRE WILL
NOT BE ACCEPTED)
FLEXIBLE DUCT
SIDE DUCT CONNECTION
USE ONLY WHERE
ATTIC SPACE WILL NOT
PERMIT TOP CONNECT -
SON o
ar
N
w
w
LAY IN TILE
TEE" BAR (TYP. ) AT FOUR
SIDES
METAL FILLER PANEL.
NOT TO SCALE
CEILING DIFFUSER AND RETURN AIR GRILLE DETAIL
FAN OR VENTILATOR BASE
GASKET
1/2" 5-12 SHEET METAL
SCREW. 2 PER SIDE
FACTORY FABRICATED CURB
1/2"0 X 2 1/2" LONG LAG SCREW 2 PER SIDE
BUILT UP ROOFING
i SEE ARCH. DETAIL'S
FAN OR VENTILATOR BASE
GASKET
1/2" 5-12 SHEET METAL
SCREW. 2 PER SIDE
f - FACTORY FABRICATED CURB
BUILT UP ROOFING
SEE ARCH. DETAIL'S
H 4"MIN. H
DAMPER
AS SPECIFIED
WHERE DUCTS PIERCE A FIRE RATED
CEILING / ROOF ASSEMBLY ENCASE
ENTIRE RUN OF DUCT FROM CEILING
TO TOP OF ROOF SHEATHING W/ 5/8"
TYPE "X " GYP. BD.
DUCT
N0TE• :
1. ANCHOR BASE SECURELY TO THE CURB.
ROOF
NOT TO SCALE
ROOF MOUNTED FAN OR VENTILATOR DETAIL
ROOF TOP A/C UNIT
RETURN AIR DUCT
2" ACOUSTICAL DUCT
LINER INSULATION
ROOF
FOR ACOUSTICAL DUCT UNNER
REQUIREMENTS SEE SPECIFICAT-
IONS (TYP. )
V _
RUBBER SEALANT GASKET
RESILIENT GASKET BY
UNIT MANUFACTURER
FLEXIBLE CONNECTION
ATMOSPHERIC VENT
3/4"
l— CONDENSATE DRAIN
SEE PLUMBING
DWG'S
SUPPLY AIR DUCT
NOTE:
1. PROVIDE NECESSARY TRANSITION FROM THE UNIT
DISCHARGE AND RETURN OPENINGS TO THE DUCT WORK
SHOWN ON THE PLAN.
NOT TO SCALE
ROOF TOP PACKAGE UNIT
Drawn by 1?LN
Checked by 5,1-N
Date APRIL IQq-T
Commission No.
Revisions
A C K
ENGINEERING
1384 Woodview Court
Oceanside, CA 92056
619) 940-9683
619)FAX 941-7431
E—mail: dinack®noi.com
PVetYteGLS/Rar>rlers Iwl,AST I' A R S. ;V I C S SU i L ' I N611 ! Y V r`Girl' 0 r 7>At
VISTA, O © j
X ' ; I V I`i V
H Y .A IIA I L.Sheet Number
M-2.1
Of Sheets
RUHNAU RUHNAUASSOCIAVTES
5751 Pekr Way. Serge C 3775 Tech Sdeet
6Carlsbad,19/43 - 89zaeae7z AWN*, CA 925013669
619/4380899 909/694.4664
FAx:619/931-8194 FAX 909/684-6276
11/10/2026 C6 184 of 357
FLUE THRU ROOF
CAST IRON ACCESS COVER
WITH THE NAME OF THE
SERVICE CAST IN COVER
COLD WATER OR GAS TO
BLDG. SLEEVE FOOTING
OR GRADE BEAM AS RE-
QUIRED.
SUPPORT VALVE BOX WITH
4 2" X 2" REDWOOD STAKES
DRIVEN TO UNDISTURBED
EARTH.
UNION
PRE -CAST CONCRETE
ACCESS BOX
SHUTOFF VALVE OR
SHUTOFF COCK.
FINISHED GRADE
OFFSET AS REQUIRED
TO ME LI DIMENSION
SHOWN IN ACCESS BOX
MAIN
NOT TO SCALE
SHUT-OFF VALVE IN ACCESS BOX
SLAB FLOOR -\
STEM WALL
1)
GAS RISER AT BLDG.
MIN. DIMENSION THAT WILL ACCOMODATE
FOOTING CLEARANCE & INSTALATIONZ -
OF GAS SHUT-OFF COCK AND GAS
PRESSURE REGULATOR
FACE OF EXTERIOR BLDG. WALL
EXT. PAVING OR FIN. GRADE
LONG RADIUS TRANSITION F!I riNG
GAS PIPE - SEE PLBG.
PLANS FOR SIZE
4" OF COMPACTED EARTH CLEARANCE
FOOTING - SEE STRUCT. DWG'S.
NOT TO SCALE
RUN REGULATOR VENT
TO OUTSIDE BUILDING,
ELBOW DOWN
SUPPORT REGULATOR
AND PIPING FROM WALL
C
c
LOW PRESSURE GAS
UNION
GAS PRESSURE REGULATOR
UNION
MEDIUM PRESSURE
GAS SERVICE
GAS SHUTOFF COCK
NOT TO SCALE
GAS PRESSURE REGULATOR
HOT WATER PIPE
EXTEND AND CUT PIPE
FLUSH WITH WALL FOR
HOSE DRAIN
45' ELBOW IN WALL
STUB THRU WALL FOR
HOSE CONNECTION
3/4" PIPE TO
3/4" HOSE
2" STANDPIPE --
2" "P" TRAP
EED
COLD WATER
PIPE
EN
NOTE:
r
1-1/2" VENT 7
LONG SHANK LOOSE KEY
STOP AND ESCUTCHEON
T & S BRASS No. B-1027—UCP
LONG SHANK CROSS HANDLE
VALVE WITH ESCUTCHEON
T & S BRASS No. B-1025
FINISHED
FLOOR
ALL PIPING CONCEALED IN WALL
NOT TO SCALE
STANDPIPE FOR CLOTHES WASHER
HOT WATER OUTLET
THERMOMETER
SHUT—OFF VALVE
TYPICAL)
UNION (TYPICAL)
2" WIDE X 1/8" THICK STL.
FASTENED WITH 1 /2"Co BOLTSTOWALL
GAS WITH DIRT LEG
16 GA 2" HIGH METAL
DRAIN PAN
RUN 1"D TO FS -1
FLOOR
COLD WATER INLET
CHECK VALVE
HOT WATER RETURN
TIME SWITH & WIRING BY ELEC.
MOUNTED ON WALL)
AQUASTAT IN OVERSIZED TEE
CIRCULATING PUMP
T & P RELIEF VALVE
3/4" DRAIN TO
FLOOR SINK
3/4" HOSE DRAIN
2/3 HEIGHT OF WATER HEATER
SECURELY ANCHOR EACH
LEG TO FLOOR WITH 1/2"
HILTI-KWIK ANCHOR BOLTS
AND SHIELDS INTO CONCRi
6" CONCRETE PAD
6"
NOTE:
1. PIPE SIZE TO BE AS SHOWN ON PLANS & EXTENDED FULL SIZE TO WATER HEATER CONNECTION AND WITH UNE SIZE VALVES. FOR
EXACT LOCATIONS OF DROPS TO WATER HEATER, SEE FLOOR PLANS.
2. WATER HEATERS TO BE APPROVED BY CALIFORNIA ENERGY COMMISSION AND ASHRAE 90-70.
WATER HEATER
NOT TO SCALE
ROOF -,12" MIN
OVERSIZED BUCKET
METAL BESTOS TYPE "B" W/
DBL. WALL FOR ATMOSPHERIC
TYPE HEATERS TYPE "PS"
FOR POWER GAS TYPE
HEATERS
METAL BESTOS FLUE CAP
STORM COLLAR
ROOF FLASHING JACK
VENT THRU ROOF
SEE PLANS OR SECTION
FOR FLUE SIZE
FLUE THRU ROOF
Drawn by LN
Checked by ILN
Date APRIL. Iaa?
Commission No.
Revisions
NACKFAX
ENGINEERING
OceansldedYtew Court
CA 92056
619) 940-9633
619) 941-7431
dlnack ani.corra
Fri I a4
1A STEiATER SEI/j C!S { 11.
G I TY D VISTA
V , 'TA, j , , ; I f
i I N I- 1-U1"IE5I N ET,A 11.Sheet Number
M ®2.2
Of Sheets
NclettzU/1'E3nrE'IS
oRUHNAU RUHNAAUASSOGi7ES
C
72 S er3775TethE—mail:lee *C CA. 92501-3669
604'4664
FA* 909/684-6276
5751 Panrwey, s
61 3 C 92(X
619/* `
FAx 619/931.8194
11/10/2026 C6 185 of 357
PERFORMANCE CERTIFICATE OF COMPLIANCE
Project Name: Vista Wastwater Services Building
Address: 1 165 Taylor Street
Vista, CA 92084
Designer: Ruhnau Ruhnau Associates
Documentation: NACK ENGINEERING
Date: 5/8/1997
Building Permit No
Checked by / Date
COMPLY 24 User 3028
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the Building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a Building using the performance compliance approach.
The Principal Designers hereby certify that the proposed building design represented in the construction documents and modelled for this permit application are consistent with all other forms and worksheets, specifi— cations, and other calculations submitted with this permit application.
The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6, Chapter 1.
1. I hereby affirm that i am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect.
2. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section 5537.2 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform.
3. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code by Section of the
Code to sign this document as the person responsible for its preparation; and for the following reason:
SCOPE OF COMPLIANCE (Designers should circle applicable paragraph numbers) ENVELOPE —
Principal Designer
Ruhna.0 Ruhnau Associates
760-438--5899
LIGHTING —
Principal Designer
JRL
619-235-6620
MECHANICAL —
Principal Designer
Neck Engineering
760-940-9683
ANNUAL SOURCE ENERGY
Energy Component
USE SUMMARY
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps
Domestic Hot Water
Lighting
Receptacle
Process
TOTALS
GENERAL INFORMATION
Conditioned Floor Area:
Glass Area / Wall Area:
Front Orientation:
Number of Zones:
SERVICE WATER HEATING
System Type:
System Efficiency:
Pipe Insulation:
Signature)
1 2 3
Date) (Circle)
lS712197 Cr)2 3
Signature`) (Date) (Circle)
KBtu/sqft-yr)
Standard
Design
3.24 35.47
30.56 0.00
0.00 5.80
43.92 22.40
9.92 Proposed
Design
1.28 15.43
29.97 0.00
0.00 5.31
51.00 22.40
49.92 Compliance
Margin
1.97 20.05
0.59 0.00
0.00 0.49
7.08 o.00
0.00 191.32 175.30 16.02
3053
0.09 0 deg (N)
9 Electric Res
0.85 0
Average Ceiling Height:
Average Glazing U -Value:
Number of Stories:
Number of Occupancies:
9.0 1.19
1 2
A. BEFORE THE BUILDING MAY BE OCCUPIED, INSTALLATION CERTIFICATES FOR MANUFACTURERS REGULATED BY THE APPLIANCE STANDARDS OR PART 6, SHALL BE POSTED ADJACENT TO THE BUILDING PERMIT(S). CERTIFICATES SHALL:
1)
2)
3)
IDENTIFY FEATURES REQUIRED TO VERIFY COMPLIANCE WITH THE APPLIANCE AND PART 6.
INCLUDE A STATEMENT INDICATING THAT THE INSTALLED DEVICES CONFORM TO THE APPLIANCE STANDARDS AND PART 6 AND THE REQUIREMENTS FOR SUCH
DEVICES GIVEN IN THE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL ENFORCEMENT AGENCY.
STATE THE BUILDING PERMIT NUMBER UNDER WHICH THE CONSTRUCTION OR INSTALLATION WAS PERFORMED.
B. THE BUILDING SHALL PROVIDE THE BUILDING OWNER, MANAGER, AND ORIGINAL OCCUPANTS THE FOLLOWING:
1) A LIST OF THE HEATING, COOLING, WATER HEATING AND LIGHTING SYSTEMS
AND FEATURES, MATERIALS, COMPONENTS, AND MECHANICAL DEVICES,
CONSERVATION OR SOLAR DEVICES INSTALLED IN THE BUILDING, AND INSTALLATIONS ON HOW TO USE THEM EFFICIENTLY.
2) REQUIRED ROUTINE MAINTENANCE ACTION SHALL BE CLEARLY STATED AND INCORPORATED ON A READILY ACCESSIBLE LABEL. THE LABEL MAY BE LIMITED TO IDENTIFYING THE MAINTENANCE MANUAL.
A DESCRIPTION OF THE QUANTITIES OF OUTDOOR AND RECIRCULATED AIR THAT THE VENTILATION SYSTEM IS DESIGNED TO PROVIDE TO EACH AREA. 3)
C. AFTER INSTALLING WALL, CEILING, OR FLOOR INSULATION, THE INSTALLER SHALL
POST IN A CONSPICUOUS LOCATION IN THE BUILDING A CERTIFICATE SIGNED BY THE
INSTALLER STATING THAT THE INSTALLATION IS CONSISTENT WITH THE PLANS AND THE REQUIREMENTS OF SECTION 10-103(a)2.A. THE CERTIFICATE SHALL ALSO STATE THE MANUFACTURER'S NAME AND MATERIAL. IDENTIFICATION AND THE INSTALLED R -VALUE.
MANUFACTURED FENESTRATION PRODUCTS SHALL:
1) HAVE TEMPORARY LABEL, NOT TO BE REMOVED BEFORE INSPECTION BY THE
ENFORCEMENT AGENCY, LISTING THE CERTIFIED U -VALUE AND CERTIFYING THAT AIR INFILTRATION RATES DO NOT EXCEED THOSE SHOW IN TABLE NO. 1-E. 2) HAVE PERMANENT LABEL LISTING THE U -VALUE, CERTIFYING ORGANIZATION, AND RATING PROCEDURES.
E. SITE CONSTRUCTED DOORS, SKYLIGHTS, WINDOWS, INCLUDING BUT NOT LIMITED TO
FIELD MANUFACTURED DOORS, SKYLIGHTS AND WINDOWS, SHALL BE CAULKED
BETWEEN THE DOOR, SKYLIGHTS, OR WINDOWS AND THE BUILDING, AND SHALL BE WEATHERSTRIPPED.
EXCEPTION: UNFRAMED GLASS DOORS AND FIRE DOORS.
F JOINTS AND OTHER OPENINGS IN THE BUILDING ENVELOPE THAT ARE POTENTIAL
SOURCES OF AIR LEAKAGE SHALL BE CAULKED, CASKETED, WEATHERSTRIPPED, OR OTHERWISE SEALED TO LIMIT INFILTRATION AND EXFILTRATION.
G. ALL INSULATING MATERIAL SHALL BE INSTALLED IN COMPLIANCE WITH THE FLAME SPREAD RATING SMOKE DENSITY REQUIREMENTS OF SECTIONS 1712 AND 1713 OF THE UBC.
H. ALL ENCLOSED SPACES IN THE BUILDING THAT ARE NORMALLY USED BY HUMANS SHALL BE VENTILATED IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 121.
EFFICIENCY STANDARDS
ANY APPLIANCE FOR WHICH THERE IS A CALIFORNIA STANDARD ESTABLISHED IN THE
APPLIANCE EFFICIENCY STANDARDS MAY BE INSTALLED ONLY IF THE MANUFACTURER
HAS CERTIFIED TO THE COMMISSION, AS SPECIFIED IN THOSE REGULATIONS, THAT THE APPLIANCE COMPLIES WITH THE APPLICABLE STANDARD FOR THAT APPLIANCE.
INCLUDED ARE ROOM AIR CONDITIONERS, CENTRAL AIR CONDITIONING HEAT PUMPS
REGARDLESS OF CAPACITY, EXCEPT THAT REQUIRED FOR CENTRAL AIR CONDITIONING HEAT PUMPS WITH COOLING CAPACITY OF 135,000 BTU/HR OR MORE
APPLY TO HEATING PERFORMANCE BUT NOT COOLING PERFORMANCE), OTHER CENTRAL AIR CONDITIONERS WITH A COOLING CAPACITY LESS THAN 135,000 BTU/HR, FAN TYPE CENTRAL FURNACES WITH INPUT RATE LESS THAN 400,000 BTU/HR, BOILERS,
WALL FURNACES, FLOOR FURNACES, ROOM HEATERS, UNIT HEATERS, AND DUCT
FURNACES SHALL HAVE BEEN CERTIFIED TO THE CALIFORNIA ENERGY COMMISSION BY ITS MANUFACTURER TO COMPLY WITH THE APPLIANCE EFFICIENCY STANDARDS.
THE FOLLOWING SPACE CONDITIONING EQUIPMENT MAY BE INSTALLED ONLY IF THE
MANUFACTURER HAS CERTIFIED THAT THE EQUIPMENT MEETS OR EXCEEDS ALL APPLICABLE EFFICIENCY REQUIREMENTS LISTED IN STANDARD 112 OF THE ENERGY EFFICIENCY STANDARDS; ALL AIR CONDITIONERS, HEAT PUMPS AND CONDENSING UNITS > 135,000 BTU/HR, ALL WATER CHILLERS; ALL GAS -FIRED BOILERS > 300,000 BTU/HR, ALL OIL -FIRED BOILERS > 225,000 BTU/HR, AND ALL WARM AIR FURNACES AND COMBINATION WARM AIR FURNACES/AIR-CONDITIONING UNITS > 225,000 BTU/HR. FAN TYPE CENTRAL FURNACES SHALL NOT HAVE A PILOT LIGHT.
LO PIPING EXCEPT THOSE CONVEYING FLUIDS AT TEMPERATURES BETWEEN 6OOE. AND 105°F. OR WITHIN HVAC EQUIPMENT SHALL BE INSULATED IN ACCORDANCE WITH STANDARD 123.
AIR HANDLING DUCT SYSTEMS SHALL BE CONSTRUCTED, INSTALLED SEALED, AND INSULATED AS PROVIDED IN CHAPTER 10 OF THE UNIFORM MECHANICAL CODE.
CONTROLS
EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH AN AUTOMATIC TIME
SWITCH WITH AN ACCESSIBLE MANUAL OVERRIDE THAT ALLOWS OPERATION OF THE SYSTEM DURING OFF -HOURS FOR UP TO 4 HOURS. THE TIME SWITCH SHALL BE CAPABLE OF PROGRAMMING DIFFERENT SCHEDULES FOR WEEKDAYS AND WEEKENDS; INCORPORATE AN AUTOMATIC HOLIDAY "SHUT-OFF" FEATURE THAT TURNS OFF ALL LOADS FOR AT LEAST 24 HOURS, THEN RESUMES THE NORMALLY SCHEDULED OPERATION; AND HAS PROGRAM BACKUP CAPABILITIES THAT PREVENT THE LOSS OF THE DEVICE'S PROGRAM AND TIME SETTING FOR AT LEAST 10 HOURS IF POWER IS INTERRUPTED.
EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH AN OCCUPANCY SENSOR TO CONTROL THE OPERATING PERIOD OF THE SYSTEM.
EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH CONTROLS THAT
TEMPORARILY RESTART AND TEMPORARILY OPERATE THE SYSTEM AS REQUIRED TO MAINTAIN A SETBACK HEATING THERMOSTAT SETPOINT.
EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH CONTROLS THAT
TEMPORARILY RESTART AND TEMPORARILY OPERATE THE SYSTEM AS REQUIRED TO MAINTAIN A SETBACK COOLING THERMOSTAT SETPOINT.
EACH SPACE CONDITIONING SYSTEM SERVING MULTIPLE ZONES WITH A COMBINED CONDITIONED FLOOR AREA MORE THAN 25,000 SQUARE FEET SHALL BE PROVIDED WITH ISOLATION ZONES. EACH ZONE SHALL: NOT EXCEED 25,000 SQUARE FEET;
SHALL BE PROVIDED WITH ISOLATION DEVICES, SUCH AS VALVES OR DAMPERS, THAT
ALLOW THE SUPPLY OF HEATING OR COOLING TO BE SET BACK OR SHUT OFF INDEPENDENTLY OF OTHER ISOLATED AREAS; AND SHALL BE CONTROLLED BY A TIME CONTROL DEVICE AS DESCRIBED ABOVE.
EACH SPACE CONDITIONING ZONE SHALL BE CONTROLLED BY AN INDIVIDUAL THERMOSTATIC CONTROL THAT RESPONDS TO TEMPERATURE WITHIN THE ZONE.
WHERE USED TO CONTROL HEATING, THE CONTROL SHALL BE ADJUSTABLE DOWN TO 55oF. OR LOWER. FOR COOLING, THE CONTROL SHALL BE ADJUSTABLE UP TO 85°F. OR HIGHER. WHERE USED TO CONTROL BOTH HEATING AND COOLING, THE CONTROL SHALL BE CAPABLE OF PROVIDING A DEAD BAND OF AT LEAST 5°F. WITHIN WHICH THE SUPPLY OF HEATING AND COOLING IS SHUT OFF OR REDUCED TO A MINIMUM.
THERMOSTATS SHALL HAVE NUMERIC SETPOINTS IN F. (FAHRENHEIT).
D THERMOSTATS SHALL HAVE ADJUSTABLE SETPOINT STOPS ACCESSIBLE ONLY TO AUTHORIZED PERSONNEL.
HEAT PUMPS SHALL BE INSTALLED WITH CONTROLS TO PREVENT ELECTRIC
RESISTANCE SUPPLEMENTARY HEATER OPERATION WHEN THE HEATING LOAD CAN BE MET BY THE HEAT PUMP ALONE. ELECTRIC RESISTANCE SUPPLEMENTARY HEATER
OPERATION IS PERMITTED DURING TRANSIENT PERIODS, SUCH AS START-UPS AND
FOLLOWING ROOM THERMOSTAT SETPOINT ADVANCE, WHEN CONTROLS ARE
PROVIDED WHICH USE PREFERENTIAL RATE CONTROL, INTELLIGENT RECOVERY,
STAGING, RAMPING, OR SIMILAR CONTROL MECHANISMS DESIGNED TO PRECLUDE
THE UNNECESSARY OPERATION OF SUPPLEMENTARY HEATING DURING THE RECOVERY PERIOD. SUPPLEMENTARY HEATER OPERATION IS ALSO PERMITTED DURING DEFROST.
VENTILATION
CONTROLS SHALL BE PROVIDED TO ALLOW OUTSIDE AIR DAMPERS OR DEVICES TO BE OPERATED AT THE VENTILATION RATES AS SPECIFIED IN THESE PLANS.
GRAVITY OR AUTOMATIC DAMPERS INTERLOCKED AND CLOSED ON FAN SHUTDOWN
SHALL BE PROVIDED ON THE OUTSIDE AIR INTAKES AND DISCHARGES OF ALL SPACE CONDITIONING AND EXHAUST SYSTEMS.
ALL GRAVITY VENTILATING SYSTEMS SHALL BE PROVIDED WITH AUTOMATIC OR
READILY ACCESSIBLE MANUALLY OPERATED DAMPERS IN ALL OPENINGS TO THE
OUTSIDE, EXCEPT FOR THE COMBUSTION AIR OPENINGS
AIR BALANCING: ALL SPACE CONDITIONING AND VENTILATION SYSTEMS SHALL BE
BALANCED TO THE QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH
THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) PROCEDURAL STANDARDS (1983), OR ASSOCIATED AIR BALANCE COUNCIL (AABC) NATIONAL STANDARDS (1968).
OUTSIDE AIR CERTIFICATION: THE SYSTEM SHALL PROVIDE THE MINIMUM OUTSIDE
AIR AS SHOWN ON THE MECHANICAL DRAWINGS, AND SHALL BE MEASURED AND CERTIFIED BY THE INSTALLING LICENSED C-20 MECHANICAL CONTRACTOR:
No. M 28449
EXP. 6--30--97
Drawn by DLN
Checked - by. DLN
Dote ARIL 14111
Commission No.
Revisions
v A C K1
ENGINEERING
Oceanside d CA 92056
619) 940-9663
FAX (619) 941-7431
E —mil: dnack®aol.com
ASTE;AIATER SERVIC-ES U L I I I
CITYsi OF VISTA
CALIFORNIAVISTAIf ,
TITLE 24 Sheet Number
T.-,24
Of Sheets
AkctIIiesnPlaners
RUHNAI! =RUH AUASSOCt1TES
5CarkD CA 900P872 3
CA992250x3669
619/4385899 909/681166
Mk 619/931.8194 FAX 909/6845276
11/10/2026 C6 186 of 357
KEY NOTES
3 A
2/32
ADD ALTERNATE No. 1 FLAN
H
2 - ROOF MOUNTED -7
15O ON OUTLET BOX.
AC
2/32
AK3/32
A
3/32
S3a
A
3/32 ab
5 X14'-0°
100
TYPICAL OF 4
5 5
3 F /K:
Al
2/32
EA -I,3
1703
PANEL 'EA'
D
2/32/
F3
2/32
Al
2/32
EA -3,5
A
3/32
EXISTING PANEL '8A'
SEE SHEET -
E2.I FOR
CONTINUATION \
ADD ALTERNATE No. 2 - EliILDINCA "E" TIRE STORAGE 2
MOUNTING SURFACE P A EA " 10,000 A,I,C, SYM
120/208 VOLTS 3 PHASE 4 WIRE MAIN 225A BUS 225A
WATTAGE
DIRECTORY
R
E
C G E R R
L
T
P
n
B
K
C
I
C
I
R
B
K
R
P
0 E G C
L
T
R
E DIRECTORY
WATTAGE
PHASE A PHASE B PHASE C PHASE A PHASE B PHASE C
1141 23 I 20 1 2 20 2 r)/W, WTR. C.1500
1136 20 3 4 2 MICROW.1500
0-1192 16 5 6 4 120
II99 19 7 8 3 540
4100049 10 4 120
828 REFRIG.1 11 12 3 680
540 3 13 14 3 150
16 EF 1,2,3,4 1212860415
1000 4 17 18 DAMPERS 1495
1000 4 19 20 40 3 AC -I 2610
22 26101500521
24 2610120423
26 30 3 AC 2 21601000425
28 2160860427
30 2160500SPARE29
32 50 3 AC 3 35651008REFRIG.2 31
1000 VCR, TV 2 33 34 3565
1121 GARB. DISP 1 35 36 3565
1500 WASH/DRY 1 37 38 SPARE 500
1500 CIRC. P./vENCI 3 39 40 500
1200 vENDINCs 2 41 42 500
1988 8456 1161 WATTS/LINE 11685 12321 11190
PHASE A= 19613 PHASE B= 20183 PHASE C= 18951
TOTAL WATTS= 59413 AMPS/LINE= 113 LCL AMPS= 190
EASE EID ADMINISTRATION BUILDING "E" LIGI-4TINGI-4TING FLAN F
Drawn by
Checked by
Date
Commission No.
Revisions
rtr.raod ors
WASTEWATER S IRV 1
CITY OF VISTA ELI
cIwn /x CALIFORNIAVISTA,1 O/TJT V.IT'S I O N 1 1 1.
C E S E U 1 L D NG L(GkTIN
Shee#
C; FLA\S
Number
A S S O G /A T S
Consulti»g Elsctriccrl Enginssrs
emu• WHIM ASSOCIATES
NW raw a+rr. o WA a+rwe
i MN' OIL
rl1. Or1 feat
nib MI/#111404 FAA OOP /1944199 Sheets24455thAvenue * Suite 310 San Diego, CA 92101 * (619)235-662011/10/2026 C6 187 of 357
GENERAL NOTES
SYMBOL LIST LIGI-TING FIXTURE SCI-IEDULE
SYMBOL.DESCRIPTION
of
101
t3
t4
0 GFI
Q
rj
T
TV
D/T
0 AFF
C.O.
X'
XR
WP
A
2/34 _
3 RECESSED FLUORESCENT LIGHT FIXTURE.
SURFACE MOUNTED FLUORESCENT LIGHT FIXTURE.
SURFACE MOUNTED FLUORESCENT STRIP LIGHT FIXTURE.
UNDER -CABINET FLUORESCENT LIGHT FIXTURE.
HID, COMPACT FLUORESCENT, OR INCANDESCENT LIGHT FIXT., WALL MTD. ON FLUSH OUTLET BOX, RECESSED DOWNL IGHT.
EXIT LIGHT FIXTURE WITH DIRECTIONAL ARROWS INDICATED.
DACENED AREA(S) INDICATES FACE(5) LIT.
FLOODLIGHTFIXTURE.
PCT WALL SWITCH. LETTERS INDICATE THE NUMBER OF SWITCHES AND OUTLETS THEY CONTROL. MOUNTED FLUSH IN BOX AT +42' UNLESS NOTED OTHERWISE.
THREE-WAY WALL SWITCH, +42' UNLESS NOTED OTHERWISE.
FOUR-WAY WALL SWITCH, •42' UNLESS NOTED OTHERWISE.
DISCONNECT SWITCH, 'F' INDICATES FUSED TYPE, MOUNTED AT +54' UNLESS NOTED OTHERWISE.
DAMPER MOTOR IN CEILING SPACE. PROVIDED BY OTHERS.
OUTLET BOX, FLUSH MOUNTED WITH BLANK COVER PLATE AT +18' UNLESS NOTED OTHERWISE.
CEILING MOUNTED JUNCTION BOX.
JUNCTION BOX, FLUSH MOUNTED AT +18' UNLESS NOTED OTHERWISE.
JUNCTION BOX, SURFACE MOUNTED AT +18' UNLESS NOTED OTHERWISE.
JUNCTION BOX WITH FLEXIBLE CONDUIT CONNECTION.
DUPLEX CONVENIENCE OUTLET MOUNTED IN FLUSH BOX AT °+I8' UNLESS NOTED OTHERWISE.
DUPLEX CONVENIENCE OUTLET MOUNTED IN SURFACE BOX AT 418' UNLESS NOTED OTHERWISE.
DOUBLE DUPLEX CONVENIENCE OUTLET, +18' UNLESS NOTED OTHERWISE.
CONVENIENCE OUTLET W/INTEGRAL GROUND FAULT INTERRUPTER, +18' UNLESS NOTED OTHERWISE.
MOTOR OUTLET.
30A, 3P,4W. GROUNDING RECEPTACLE WITH MATCHING PLUG, NEMA LIF,-30, HUBBELL *2130 SERIES.
SURFACE MOUNTED BRANCH CIRCUIT PANELBOARD.
DISTRIBUTION SWITCHBOARD.
TERMINAL CABINET.
DATA SYSTEM OUTLET, +18" UNLESS NOTED OTHERWISE.
DATA/ TELEPHONE SYSTEM OUTLET, +I8' UNLESS NOTED OTHERWISE.
WALL MOUNTED VOLUME CONTROL, +42' UNLESS NOTED OTHERWISE.
SPEAKER BACKBOX PROVIDED BY OWNER, MOUNTED FLUSH IN CEILING.
BRANCH CIRCUIT CONDUIT, CONCEALED IN WALL OR CEILING.
BRANCH CIRCUIT CONDUIT, CONCEALED IN FLOOR OR UNDERGROUND.
BRANCH CIRCUIT CONDUIT, RUN EXPOSED.
2* 12,. I/2'C.
II 3* 12, 1/2°C.
51'12, I/2'C.
6°12, 1/2°C.
II 4* 12, I/2"C. I .I II 1°12, 3/4'C.
TELEPHONE SYSTEM CONDUIT, 3/4" C.D. UNLESS NOTED OTHERWISE.
TELEVISION SYSTEM CONDUIT, 3/4' C.O. UNLESS NOTED OTHERWISE.
DATA/ TELEPHONE SYSTEM CONDUIT.
CONDUIT RUN TUf2NED UP. •
CONDUIT RUN TURNED DOWN.
CONDUIT RUN STUBBED OUT.
BRANCH CIRCUIT HOMERUN WITH PANEL AND CIRCUIT DESIGNATED.
ABOVE FINISH FLOOR.
CONDUIT ONLY.
INDICATES EXISTING TO REMAIN.
INDICATES EXISTING TO BE REMOVED.
WEATHERPROOF.
LIGHTING FIXTURE DESIGNATION.
QUANTITY AND WATTAGE OF LAMPS.
WHEN USED ON LIGHTING PLANS ONLY)
MECHANICAL UNIT DESIGNATION.
WHEN USED ON POWER PLANS ONLY)
G
2/32
ITEM TYPE SIZE
LAMPS
TYPE COLOR
CIRCUIT
VOLTS
WATTAGE NOTES
A
32 RECESSED FLUORESCENT
TROFFER
L I THON I A*2 SP/G/3/32 /FLU/
A12125/I20/GEB OR EQUAL
2'X4'3-F32T8 WW 120 9l
1 ELECTRONIC
BALLAST.
AI
2/32
SAME AS 'A' EXCEPT
2 - LAMPS
L I THON I A*2SP/G/2/32/FW/
A12125/120/GEB OR EQUAL
21X4'2-F32T8 120 69
ELECTRONIC
BALLAST.
B
2/32/
SURFACE MOUNTED
FLUORESCENT
L ITHON IA'YC/232/A/I20/GEB
OR EQUAL
1'X4'2-F32T8 WU1 120 69
FLUORESCENT WALL
BRACKET
L I THON 'AU/2 32 /120/GEB
PRA -12O OR EQUAL
4'LONG 2-F32TS WW 120 69
ELECTRONIC
BALLAST.
0 ELECTRONIC
BALLAST.
D13)
RECESSED COMPACT
FLUORESCENT
PRESCOL ITE*CBXIC/TL -41/
HPF OR EQUAL
6'DIA.I-13WQUAD STANDARD 120 22
00 WALL MOUNTED HID
AREA L 16I -4T
QUAL ITY"NW-1/3/HPS/100/N/
12O/DBZ/TP OR EQUAL
l'WX12'HX5.25'D 100WHPS STANDARD 120 115
UNDER CABINET
FLUORESCENT
L ITHONIA*2UC/1/32/AR/120/
SSB OR EQUAL
4'LONG 1-F32T8 WW 120 34
FLUORESCENT STRIP
L ITHON IA*C/2/40/120/ES
OR EQUAL
4'LONG 2 -F32T8 WW 120 69
HK00)
OUTDOOR HID FLOOD
LIGHT
QUAL ITY"FL1/CT/1x1/MH/100/
12O/BLK/BLS OR EQUAL
NA 1-100011-1 STANDARD 120 115
THESE FIXTURES SHALL COMPLY WITH ALL STANDARDS SET FORTH BY THE STATE OF CALIFORNIA TITLE 24.
UNDERraROUND ", METER, MAIN CB
4 DISTRIBUTIONPULLSECTION
SINGLE LINE [DIAGRAM
EXISTING METER 4 MAIN
DISTRIBUTION SWITCHBOARD
8004, 120/208' ', 30, 4W BUS
2-(3"500 MCM)
225AT
225AF
3P
225AT
225AF
3P
225AT
225AF
3Prm
PANEL 'AA'
PANEL 'AB' I
PANEL 'BA'
EXISTING 8004, 3P, 208V, 30
AUTOMATIC TRANSFER SWITCH
m 3P
125AT
125AF
3Pn
METAL BUILDING
PANEL 'E'
2-(3'3/G)
EXISTING
LOADS
F -CA' 4'300 MCM, 2'C
225AT
225AF
3P(Th
30AT
100AF
NEW
PANEL
TRUCK
LIFT
400AT
400AF
EXISTING I00KW, 208/120V, 30, 4W
ENGINE GENERATOR
NO SCALE
4,FESSio
4R.(44
Q
9 - 98
4ECTR\ ''CAL1
Drown by
Checked by
Dote
Commission No. -
Revisions
C:onsulttng
ASSOCIATES
Elactrlcp! ErigTnaars
2445 5th Avenue * Suite 310 Son Diego, CA 92101 * (619)235-6620 Ar ab / Pfirstes
FIUHNAU• 9 4U ASSOCIATES
0701Pillage Waft Soft C WV Tea NNW
CIL 111100•4111711 Rhersido, CA. 1180146110
M / 48048101 i0! / 4118041114
PA* / 11014W FAIL OM
WASTEWATER SERVICES BUILDING
CIT1OF VISTA
VISTA CALIFORNIA
SYMBOL LIST, FIXT1J E
SC-4EDUL, ff SINGLE
LIN IAG4'
Sheet Number
Ci
Sheets
11/10/2026 C6 188 of 357
EXISTING
BUILDING B
X
ADD ALT.
NO. 3
EXISTING
BUILDING C
EXISTING PANEL 'E'
EXISTING TELEPHONE/DATA
BACKBOARD
EXISTING METER 4 MAIN SWITCHBOARD
EXISTING TELEPHONE BACKBOARD 'TB'
XR
X
XR
EXISTING
BUILDING D
DEMOLfTION SITE FLAN
1r" NO
PANEL 'EA" --- /
TELEPHONE/DATA
BACKBOARD 'TE'
NEW
ADMINISTRATION BUILDING
EXISTING
BUILDING B
EXISTING METER E MAIN SWITCHBOARD
EXISTING TELEPHONE BACKBOARD 'TB"
F -'EA'
ADD ALT.
NO. 3
ADD ALT. i
NO.2
EXISTING
BUILDING
NEUJ SITE PLAN
O REMOVE CONDUCTORS, CUT BACK STUB UPS, AND
ABANDON IN PLACE.
O REMOVE COPPER 4 FIBER OPTIC CABLE AND
STORE IN EXISTING BUILDING 'B' FOR FUTURE
REINSTALLATION.
03 PROVIDE 1-2' G.O. (TELEPHONE).
04 24' W. x 24° H. x8° D. PULLBOX.
05 PROVIDE 1-2° C.O. (TELEPHONE) I-2' G.O. (TV), AND
1-2' G.O. (DATA).
0 NEMA 3R PULLBOX.
0 10 20 40
SCALE: 1" = 20'
Drawn by
Checked by
Date
Commission No,
Revisions
Mmmir.
WASTEWATER
CITY OF VISTA
VISTA, CALIFORNIA
SERVICES E3UILIDINCB F' _
a
Sheet Number
0,2
Of Sheets
ssoc,, 7-ES ier
C.onsu/fing EtectrTccrt Englncasrs
RURAL' • Ott ASSOCIATES
ea armNal
afar /''WA SOS / M`4"
PAL 4O 1 NMw4 FAX. SOP /2445 5th Avenue * Suite 310 Son Diego, CA 92101 * (619)235-652011/10/2026 C6 189 of 357
29 10
1997
EXISTING GOOD ATS
EXISTING PANEL 'BA'
EXISTING METER
4 MAIN SWITCHBOARD
3'10, I/2' C. -
TO MAIN
SWITCHBOARD
WP
GFI
ADD ALTERNATE No. I - POWER 4 SIGNAL FLAN ADD ALTERNATE No. 3 - BUILDING B TIRE STORAGE 42'13
13 I
23 EA-20,2111
3"10, 1/2' C. -
r©6
GFI
EA -9,11,13'.
23 25 /4
8'x8'x4'
44'.19Q
54' u-1 t , w
L
EA -IS
WP
EA -19,21
19 EA -26,28,30
EA -10,12
WP
10 © +42'
21 EA -8
10 SEA -21
EA -31,33,35 -
EA -32,34,36
3 'S, 3/8' C.
10 ED/T
EA -16
PANEL'EA'
INTRUSION ALARM
12 / (
BY OTHERS)
TELEPHONES/ DATA
BACKBOARD
gg EA -6,8
EA -14 GFj
I/2' C.O.
TYPICAL) .
GFI+ GFI
42'8
g +
42'
EA -2,4
2i
60' {TVA
33 39
154•
39 41
12 42'
35 WP
I +12' ,
C .TC 39
EA -31,39,41
BASE BID - ADMINISTRATION BUILDING IIE' POWER 4 SIGNAL FLAN 2 XR
I EXISTING PANELBOARD
ADD ALTERNATE No. 3 - GARAGE DEMOLITION F OOR FLAN
0 CD
J
CD
3 Q
CD
CD
4-4 UTP, I' C. STUB INTO ACCCESSIBLE CEILING SPACE TYPICAL OF ALL DATA/TELEPHONE OUTLETS.
TIMECLOCK PROVIDED BY OTHERS.
2' G.O. TO WEATHER HEAD ON ROOF FOR ANTENNA CABLES. VERIFY EXACT LOCATION WITH OWNER.
2' C.O. STUBBED INTO ACCESSIBLE CEILING SPACE FOR SPEAKER SYSTEM
PROVIDED BY OWNER,
MICROWAVE OVEN.
GARBAGE DISPOSAL UNDER SINK.
CIRC. PUMP BY OTHERS. I-6 HP, I20v, 1C .
DEMOLISH EXISTING LIGHTING CONDUIT, CONDUCTORS, PANELBOARD, AND EQUIPMENT.
DISHWASHER.
STUB INTO ACCESSIBLE CEILING SPACE.
CONNECT TO STUB -OUT IN BASE BID.
TO TIME CLOCK LOCATED IN STORAGE RM. 102,
TO EXISTING PANEL 'BA' SPARE 2OA, IP. CIRCUIT BREAKER "38. 4 SCALE: 1 /8"-
c.)
0 ESS/©,,l
x\\..4R.(g1,
p• 9 98
eFCTR
Drawn by
Checked by
Commission Na.
Revisions
ASSOCIATESDote
Consulting Electric -cal EnginBer
POrmar.
WASTELJ,-ATE SERVICES 151.E I LD ill
1 !
Sty ! z
A !ltAi! • Atr1'NAU A884CaAiES CITY OF VISTA fi
I
OM r4 O
s.e.0 6776 Time Nowt
00Aso6A'r:: wM..w,, a+. 6aese0
6A / 4004000 600 / A6iNOt
PAL 6R 1 MOM FA* 000 / 0144170
VISTA, CAl...IrL/1! Y I f""1
2445 5th Avenue * Suite 310 San Diego, CA 92101 * (619)235-6620 ears11/10/2026 C6 190 of 357
APPENDIX E
Building A Plans
11/10/2026 C6 191 of 357
1165 E TAYLOR ST.
VISTA, CA 92084
PROJECT ADDRESS:
ASSESSOR'S PARCEL NO.
OWNER:
GOVERNING AGENCY:
SCOPE OF WORK:
GOVERNING CODES:
OCCUPANCY GROUP:
CONSTRUCTION TYPE:
1712-505-600
CITY OF VISTA PUBLIC WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
CITY OF VISTA BUILDING DEPARTMENT
200 CIVIC CENTER DRIVE
VISTA, CA 92084
2019 CALIFORNIA BUILDING CODE
2019 CALIFORNIA ENERGY CODE
2019 CALIFORNIA FIRE CODE
2019 CALIFORNIA ELECTRICAL CODE
2019 CALIFORNIA PLUMBING CODE
2019 CALIFORNIA MECHANICAL CODE
2019 CALIFORNIA GREEN BUILDING STANDARDS
DEMOLITION OF EXISTING BUILDINGS AND
CONSTRUCTION OF A NEW SINGLE-STORY
ADMINISTRATION BUILDING. ADDITION OF A
NEW PUBLIC DRIVEWAY ADJACENT TO A NEW
PUBLIC PARKING LOT. WORK ALSO INCLUDES:
SITE GRADING
IRRIGATION AND LANDSCAPING
UTILITY CONNECTIONS
FIRE IMPROVEMENTS
PHOTOVOLTAICS
B
TYPE VB, SPRINKLERED
BUILDING AREA:
SITE AREA:
NUMBER OF STORIES:
9,998 S.F.
142,877 S.F.
3.28 ACRES)
1 ALLOWABLE (G.F.A)ACTUAL
27,000 S.F.
SPRINKLERED)
BUILDING HEIGHT:
22'-6"
ALLOWABLE ACTUAL
60'-0"
SPRINKLERED)
PARKING:
1 10
11 REQUIRED ACTUAL
PUBLIC PARKING
ACCESSIBLE PARKING SPACES:
STANDARD PARKING SPACES:
TOTAL PUBLIC PARKING:
EXISTING PRIVATE PARKING
EXISTING ACCESSIBLE PARKING SPACES:
EXISTING STANDARD PARKING SPACES:
TOTAL EXISTING PRIVATE PARKING:
0 8
8 ARCHITECTURE
JEFF KATZ ARCHITECTURE
6353 Del Cerro Blvd
San Diego, CA 92120
619) 698-9177
Contact: Jeff Katz, AIA
[email protected]
PLUMBING
McPARLANE & ASSOCIATES
4830 Viewridge Avenue
San Diego, CA 92123
619) 277 -9721
Contact: Doug Isaaks, P.E.
[email protected]
ELECTRICAL
ELEN CONSULTING, INC.
9150 Chesapeake Dr., Suite 220
San Diego, CA 92123
619) 550-1085
Contact: Anton Nathanson
[email protected]
LANDSCAPE
ASR LANDSCAPE ARCHITECTURE
P.O. BOX 7314
Rancho Santa Fe, CA 92067
619) 992-8196
Contact: Andrew Reese, President
[email protected]
GEOTECHNICAL ENGINEER
GEOCON INCORPORATED
6960 Flanders Drive
858) 558-6900
Contact: Rod Mikesell, Vice
President/Senior Engineer
[email protected]
CIVIL
DELANE ENGINEERING
4909 Murphy Canyon Road,
Suite 330
San Diego, CA 92123
619) 787-5566
Contact: John Prince
[email protected]
STRUCTURAL
ORIE 2 ENGINEERING, INC.
9750 Miramar Road, Suite 310
San Diego, CA 92126
619) 335-7843
Contact: Don Orie
[email protected]
MECHANICAL
McPARLANE & ASSOCIATES
4830 Viewridge Avenue
San Diego, CA 92123
619) 277 -9721
Contact: Doug Isaaks, P.E.
[email protected]
PROJECT LOCATION:
CITY OF VISTA PUBLIC WORKS
PROJECT LOCATION:
CITY OF VISTA PUBLIC
WORKS
A REGISTERED CALIFORNIA ARCHITECT, CIVIL OR STRUCTURAL ENGINEER SHALL
OBSERVE THE WORK OF CONSTRUCTION AND SUBMIT AFFIDAVI TS ATTESTING TO
THE COMPLIANCE OF THE CONSTRUCTION WITH THE APPROVED CONTRACT DOCUMENTS.
NOTE:
THE FOLLOWING WORK SHALL BE APPROVED AS A DEFERRED SUBMITTAL AND IS NOT UNDER THIS REVIEW:
AUTOMATIC FIRE SPRINKLER SYSTEM
DEFERRED SUBMITTALS:
FOR SPECIAL INSPECTION SUMMARY, SEE SHEET S1.0.
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
TITLE SHEET
200102
T-1
BC
JK
MM
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
PROJECT DATA
PROJECT TEAM
VICINITYMAPLOCATIONMAP
CITY OF VISTA PUBLIC WORKS DEPARTMENT
ADMINISTRATION BUILDING
1165 E TAYLOR ST. VISTA, CA 92084
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 192 of 357
GRID
DETAIL
BUILDING SECTION
WALL TYPE
WINDOW TYPE
DOOR NUMBER
DATUM POINT
CORNER GUARD
FIRE EXTINGUISHER
CONTINUOUS, UNOBSTRUCTED AND
UNDIMINISHED PATH OF TRAVEL
ROOM NAME
ROOM NUMBER
INTERIOR ELEVATION
CG
FE
123
BUNK
AT LEAST ONE PORTABLE FIRE EXTINGUISHER WITH A MINI MUM RATING OF 2A10BC SHALL BE PROVIDED WITHIN 75' MAXIMUM TRAVEL DISTANCE FOR EACH 3,000 SQUARE FEET OR PORTION THEREOF ON EACH FLOOR (CFC 906, UFC STANDARD 10-1, TITLE 19, SECT. 3.29). SEE PLANS FOR LOCATIONS.
AT LEAST ONE FIRE EXTINGUISHER WITH A MINIMUM RATING OF 4A2OBC SHALL BE PROVIDED OUTSIDE OF EACH MECHANICAL, ELECTRICAL OR BOILER ROOM. (CFC 906, UFC STANDARD 10-1, TITLE 19, SECT. 3.29). SEE PLANS FOR LOCATIONS.
COMPLETE PLANS AND SPECIFICATIONS FOR FIRE-EXTINGUI SHING SYSTEMS,
INCLUDING AUTOMATIC SPRINKLERS AND WET AND DRY STANDPIPES, HALON
SYSTEMS AND OTHER SPECIAL TYPES OF AUTOMATIC FIRE-EXTINGUISHING SYSTEMS,
BASEMENT PIPE INLETS, AND OTHER FIRE-PROTECTION SYSTEMS AND
APPURTENANCES THERETO SHALL BE SUBMITTED BY THE CONTRACTOR TO FIRE AND LIFE SAFETY FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. (CFC 901.2)
FIRE-EXTINGUISHING SYSTEMS SHALL BE INSTALLED BY THE CONTRACTOR IN ACCORDANCE WITH CBC 903.
ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER
SYSTEMS AND WATER-FLOW SWITCHES ON ALL SPRINKLER SYSTEMS SHALL BE ELECTRICALLY MONITORED WHERE THE NUMBER OF SPRINKLERS IS 100 OR MORE.
CBC 904.3.1, CFC 903.4)
COMPLETE PLANS AND SPECIFICATIONS FOR FIRE ALARM SYSTEMS INCLUDING
AUTOMATIC SPRINKLERS SHALL BE SUBMITTED BY THE CONTRACTOR TO THE FIRE MARSHAL FOR REVIEW AND APPROVAL PRIOR TO INSTALLATI ON. (CFC 1001.3) INSTALLATION OF FIRE ALARM SYSTEMS SHALL BE IN ACCORDANCE WITH CFC 907.
AN APPROVED AUDIBLE SPRINKLER FLOW ALARM SHALL BE PROVIDED ON THE EXTERIOR OF THE BUILDING IN AN APPROVED LOCATION. AN APPROVED AUDIBLE
SPRINKLER FLOW ALARM TO ALERT THE OCCUPANTS SHALL BE PROVIDED IN THE INTERIOR OF THE BUILDING IN A NORMALLY OCCUPIED LOCATION.
ANY TIME A BUILDING IS OCCUPIED THE MEANS OF EGRESS SHALL BE ILLUMINATED AT AN INTENSITY OF NOT LESS THEN 1 FOOT-CANDLE AT THE FLOOR LEVEL.
EGRESS ILLUMINATION REQUIRES A SOURCE OF EMERGENCY POWER WHEN THE OCCUPANT LOAD IS 100 OR MORE.
1. 2.
3. 4.
5. 6.
7. 8.
9. 10.
DIMENSIONS SHOWN ON THE FLOOR PLANS, SECTIONS AND DETAILS ARE TO FACE OF
STUDS, COLUMN GRID LINES AND FACE OF CONCRETE AND BLOCK WALLS, UNLESS OTHERWISE NOTED OR SHOWN.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFORE PROCEEDING WITH CONSTRUCTION.
ALL ITEMS ARE BASE BID UNLESS OTHERWISE NOTED OR SPECIFIED.
ALL DRAIN LINES WITHIN WALLS ARE TO BE WRAPPED IN SOUND INSULATION BATTS.
EVERY EXIT DOOR SHALL BE OPERABLE FROM THE INSIDE WITHOUT USE OF A KEY OR ANY SPECIAL KNOWLEDGE.
CONTRACTOR SHALL PROVIDE ACCESS PANELS REQUIRED BY THE PLUMBING, AIR CONDITIONING AND OTHER INSTALLERS, AS REQUIRED BY CODE. ANY ACCESS PANEL IN A
FIRE RATED WALL OR CEILING SHALL HAVE THE SAME FIRE RATING AS THE WALL OR CEILING IN WHICH THEY OCCUR.
STRUCTURAL AND FIRE RESISTIVE INTEGRITY SHALL BE MAINTAINED AT PENETRATIONS FOR
MECHANICAL, PLUMBING, ELECTRICAL, AND COMMUNICATIONS PIPE, DUCT AND CONDUIT AS INDICATED.
PROVIDE FIRE BLOCKING AT FLOOR, CEILING AND MID HEI GHT OF WALLS OVER 10'-0".
STUCCO, PLASTER AND GYPSUM BOARD SHALL TERMINATE WI TH A "J" MOLDING WHERE THE EDGE IS EXPOSED UNLESS NOTED OR SPECIFIED OTHERWISE.
A FLOOR OR LANDING NOT MORE THE 1/4" BELOW THE THRESHOLD IS REQUIRED AT EACH SIDE OF AN EXIT DOOR.
BRAND OR TRADE NAME, SUBSTITUTIONS OF "EQUALS": REQUESTS FOR SUBSTITUTIONS OF AN ITEM AS AN "EQUAL" TO ANY ITEM INDICATED OR SPECIFIED MUST BE INCLUDED AS A PART OF THE CONTRACTOR'S BID PROPOSAL, AS SPECIFIED IN THE GENERAL CONDITIONS.
WRITTEN DIMENSIONS TAKE PRECEDENCE OVER GRAPHIC SCALE. DO NOT SCALE DRAWINGS.
IT SHOULD BE NOTED THAT WHILE EXISTING UTILITY DRAWINGS ARE AVAILABLE, THERE IS NO ASSURANCE THAT ALL UTILITIES ARE SHOWN. THE CONTRACTOR SHALL PROCEED WITH
CAUTION TO INSURE THAT ALL UTILITIES ENCOUNTERED, WHETHER OR NOT OF RECORD, SHALL BE PROTECTED FROM DAMAGE. THE CONTRACTOR SHALL ALSO TAKE PRECAUTIONS
NECESSARY TO PROTECT HIMSELF AND ALL EMPLOYEES FROM INJURY WHICH MAY BE CAUSED BY CONTACT WITH UTILITY SERVICES.
GYPSUM BOARD FOR FIRE RATED ASSEMBLIES SHALL BE INSTALLED IN ACCORDANCE WITH CBC CHAPTER 7.
DOOR HARDWARE SHALL BE LEVER TYPE.
MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 POUNDS FOR EXTERIOR DOORS AND 5 POUNDS FOR INTERIOR DOORS.
FIRE DAMPER ASSEMBLIES, INCLUDING SLEEVES AND INSTALLATION PROCEDURES SHALL BE APPROVED BY THE BUILDING INSPECTOR PRIOR TO INSTALLATION.
INTERIOR FINISHES SHALL COMPLY WITH THE PROVISIONS OF CBC CHAPTER 8.
ALL DECORATIVE MATERIALS SHALL BE MAINTAINED IN A FLAME-RETARDANT CONDITION.
ALL REQUIRED PERMITS MUST BE OBTAINED BEFORE BUILDI NG IS OCCUPIED.
BUILDING NUMBERS SHALL BE EASILY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY.
THE CONSTRUCTION, REMODEL, OR DEMOLITION OF A BUILDING SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY OF VISTA.
THESE PLANS AND ALL WORK SHALL COMPLY WITH THE CALI FORNIA BUILDING STANDARDS CODE FOUND IN THE STATE OF CALIFORNIA TITLE 24 CCR, AS AMENDED AND ADOPTED BY THE CITY OF VISTA.
CONTRACTOR SHALL THOROUGHLY COORDINATE ALL TRADES AS REQUIRED TO COMPLETE ALL WORK INDICATED AND NECESSARY FOR THE PROJECT.
CONTRACTOR SHALL PROTECT EXISTING SITE FEATURES AND SHALL REPAIR OR REPLACE ALL ITEMS DAMAGED DURING CONSTRUCTION.
EXIT SIGNS MUST BE INTERNALLY ILLUMINATED (UFC SEC. 1212.4 & CBC SEC.1006).
TWO SEPARATE POWER SUPPLIES SHALL BE PROVIDED FOR EXIT SIGNS PER(CBC SEC. 1006).
THE CONTRACTOR SHALL ENFORCE ALL SAFETY MEASURES. THE CONTRACTOR SHALL
DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING AND
SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATION.
CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY MONUMENTATION AND / OR BENCHMARKS WHICH WILL BE DISTURBED OR DESTROYED BY CONSTRUCTION. SUCH
POINTS SHALL BE REFERENCED AND REPLACED WITH APPROPRIATE MONUMENTATION BY A
LICENSED LAND SURVEY OR REGISTERED CIVIL ENGINEER AS REQUIRED BY THE LAND SURVEYOR'S ACT.
CONTRACTOR SHALL REPLACE IN KIND ANY TRAFFIC SENSORS DAMAGED DURING CONSTRUCTION.
PENETRATION OF FIRE RESISTIVE WALLS, FLOOR - CEILING ASSEMBLIES AND ROOF - CEILINGS SHALL BE PROTECTED AS REQUIRED IN CBC SECTION 712 AND 713.
NO HAZARDOUS MATERIALS WILL BE USED OR STORED WITHIN THE BUILDING WHICH EXCEED THE QUANTITIES SHOWN ON CBC TABLE 307.1.
WHEN SERVING MORE THAN 100 SPRINKLER HEADS, AUTOMATIC SPRINKLER SYSTEMS SHALL
BE SUPERVISED BY AN APPROVED CENTRAL PROGRAM OR REM OTE STATION SERVICE OR
SHALL BE PROVIDED WITH A LOCAL ALARM WHICH WILL GIVE AN AUDIBLE SIGNAL AT A CONSTANTLY ATTENDED LOCATION.
1. 2.
3. 4.
5. 6.
7. 8.
9. 10.
11. 12.
13. 14.
15. 16.
17. 18.
19. 20.
21. 22.
23. 24.
25. 26.
27. 28.
29. 30.
31. 32.
33. 34.
AND
ANGLE
AT
CENTERLINE
DIAMETER OR ROUND
POUND OR NUMBER
ACOUSTICAL
AREA DRAIN
ADJUSTABLE
AGGREGATE
ALUMINUM
APPROXIMATE
ARCHITECTURAL
ASPHALT
BOARD
BITUMINOUS
BUILDING
BLOCK
BLOCKING
BEAM
BOTTOM
CABINET
CATCH BASIN
CEMENT
CERAMIC
CORNER GUARD
CAST-IRON
CONTROL JOINT
CEILING
CAULKING
CLOSET
CLEAR
COLUMN
COMMUNICATION
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
CORRIDOR
COUNTERSUNK
CERAMIC TILE
DOUBLE
DETAIL
DIAMETER
DIMENSION
DISPENSER
DOWN
DRAWER
DOWNSPOUT
DRY STANDPIPE
DRAWING
EAST
EACH
EXPANSION JOINT
ELEVATION
ELECTRICAL
ELEVATION
EMERGENCY
ENCLOSURE
EQUAL
EQUIPMENT
EXISTING
EXPOSED
EXPANSION
EXTERIOR
FIRE ALARM
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FIRE HOSE CABINET
FINISH
FLOOR
FLASHING
FLUORESCENT
FACE OF BLOCK
FACE OF CONCRETE
FACE OF FINISH
FACE OF STUDS
FULL SIZE
FOOT OR FEET
FOOTING
FURRING
FINISHED FLOOR ELEVATION
GAUGE
GALVANIZED
GRAB BAR
GLASS
GRADE
GYPSUM
HOSE BIB
HOLLOW CORE
HARDWOOD
HARDWARE
HOLLOW METAL
HORIZONTAL
HEIGHT
L
@
I
ACOUS.
A.D.
ADJ.
AGGR.
ALUM.
APPROX.
ARCH.
ASPH.
BD.
BITUM.
BLDG.
BLK.
BLKG.
BM.
BOT.
CAB.
C.B.
CEM.
CER.
CG
C.I.
CJ
CLG.
CLKG.
CLO.
CLR.
COL.
COMM
CONC.
CONN.
CONSTR.
CONT.
CORR.
CTSK.
C.T.
DBL.
DET
DIA.
DIM.
DISP.
DN.
DWR.
DS.
D.S.P.
DWG.
E.
EA.
E.J.
ELE.
ELEC.
ELEV.
EMER.
ENCL.
EQ.
EQPT.
EXST.
EXPO.
EXP.
EXT
F.A.
F.D.
FDN
F.E.
F.E.C.
F.H.C.
FIN.
FL
FLASH
FLUOR.
F.O.B.
F.O.C.
F.O.F.
F.O.S.
F.S.
FT
FTG.
FURR.
F.F.E.
GA.
GALV.
G.B.
GLASS
GR
GYP.
H.B.
H.C.
HDWD.
HDW.
H.M.
HORIZ.
H
INSIDE DIAMETER
INSULATION
INTERIOR
IRRIGATION
JOINT
LAMINATED
LAVATORY
MAXIMUM
MEDICINE CABINET
MECHANICAL
METAL
MANUFACTURER
MINIMUM
MISCELLANEOUS
MASONRY OPENING
MOUNTED
NORTH
NOT IN CONTRACT
NOT TO SCALE
OVERALL
ON CENTER
OUTSIDE DIAMETER
OPENING
OPPOSITE
PRE-CAST
PLATE
PLASTIC LAMINATE
PLASTER
PLYWOOD
PAIR
POINT
PAPER TOWEL DISPENSER
RECEPTACLE
RADIUS
ROOF DRAIN
REFERENCE
REFRIGERATOR
REINFORCED
REQUIRED
ROOM
ROUGH OPENING
RE-SAWN
REDWOOD
RAIN WATER LEADER
SOUTH
SOLID CORE
SEAT COVER DISPENSER
SCHEDULE
SOAP DISPENSER
SECTION
SHELF OR SHEET
SHOWER
SIMILAR
SPECIFICATION
SQUARE
STAINLESS STEEL
STATION
STANDARD
STEEL
STORAGE
STRUCTURAL
SUSPENDED
SYMMETRICAL
SHEET METAL
TOP OF CURB
TELEPHONE
TERRAZZO
TEMPERED GLASS
TONGUE AND GROOVE
THICK
TOP OF PAVEMENT
TOILET PAPER DISPENSER
TELEVISION
TYPICAL
TOP OF
TOP OF FRAMING
TOP OF MASONRY
TOP OF PARAPET
TOP OF SHEATHING
UNLESS OTHERWISE NOTED
URINAL
VERTICAL
VESTIBULE
VERIFY IN FIELD
PLUMBING VENT THRU ROOF
WEST
WITH
WATER CLOSET
WOOD
WITHOUT
WATERPROOF
WEAKENED PLANE JOINT
WAINSCOT
WEIGHT
I.D.
INSUL.
INT.
IRRIG.
JT.
LAM.
LAV.
MAX.
M.C.
MECH.
MET.
MFR.
MIN.
MISC
M.O.
MTD.
NO.
N.I.C.
N.T.S.
O.A.
O.C.
O.D.
OPNG.
OPP.
PC.
PL.
P.LAM.
PLAS.
PLYWD
PR.
PT.
P.T.DISP.
RECP.
RAD.
R.D.
REF.
REFR.
REINF.
REQ.
RM.
R.O.
RS.
RWD.
R.W.L.
SO.
S.C.
S.C.DISP.
SCHD.
S.DISP.
SECT.
SH.
SHR.
SIM
SPEC.
SQ.
ST.STL.
STA.
STD.
STL.
STOR.
STRUC.
SUSP.
SYM.
S.M.
T.C.
TEL.
TER.
TG
T&G
THK.
T.P.
T.P.DISP.
T.V.
TYP.
T.O.
T.O.F.
T.O.M.
T.O.P.
T.O.S.
U.O.N.
UR
VERT.
VEST.
V.I.F.
V.T.R.
W
W/
W.C.
WD.
W/O
WP.
WPJ
WSCT
WT.
L
o
C
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
TITLE SHEET
200102
T-2
BC
JK
KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
No. Description
S1.0 STRUCTURAL NOTES
S1.1 STRUCTURAL NOTES
S1.2 TYPICAL STRUCTURAL DETAILS
S1.3 TYPICAL STRUCTURAL DETAILS
S1.4 TYPICAL STRUCTURAL DETAILS
S1.5 TYPICAL STRUCTURAL DETAILS
S1.6 TYPICAL STRUCTURAL DETAILS
S2.0 FOUNDATION PLAN
S2.1 ROOF FRAMING PLAN
S3.1 STRUCTURAL SECTIONS
S4.1 STRUCTURAL DETAILS
S4.2 STRUCTURAL DETAILS
S4.3 STRUCTURAL DETAILS
S4.4 STRUCTURAL DETAILS
S4.5 STRUCTURAL DETAILS
S4.6 STRUCTURAL DETAILS
S4.7 STRUCTURAL DETAILS
M0.1 MECHANICAL GENERAL NOTES AND LEGEND
M0.2 MECHANICAL SCHEDULES
M0.3 MECHANICAL SCHEDULES
M1.1 MECHANICAL THERMAL ZONING PLAN
M2.1 MECHANICAL FLOOR PLAN
M2.2 MECHANICAL PIPING FLOOR PLAN
M2.3 MECHANICAL ROOF PLAN
M3.1 MECHANICAL DETAILS
M3.2 MECHANICAL DETAILS
M3.3 MECHANICAL DETAILS
M4.1 MECHANICAL CONTROL DIAGRAMS
M5.1 TITLE 24 DOCUMENTATION
P0.1 PLUMBING GENERAL NOTES AND LEGEND
P0.2 PLUMBING SCHEDULES
P1.0 PLUMBING SITE PLAN
P2.1 PLUMBING FLOOR PLAN
P2.2 PLUMBING ROOF PLAN
P3.1 PLUMBING ENLARGED VIEWS
P3.2 PLUMBING ENLARGED VIEWS
P4.1 PLUMBING RISER DIAGRAMS
P4.2 PLUMBING RISER DIAGRAMS
P5.1 PLUMBING DETAILS
E0.1 LEGENDS NOTES AND ABBREVIATIONS
E0.2 SINGLE LINE DIAGRAM AND CALCULATIONS
E0.3 PANEL SCHEDULES
E1.0 ELECTRICAL SITE PLAN
E2.0 FIRST FLOOR PLAN - POWER
E2.1 FIRST FLOOR PLAN - LIGHTING
E2.2 FIRST FLOOR PLAN - MECH
E3.0 ELECTRICAL ROOF PLAN
E4.1 ELECTRICAL DETAILS
E4.2 ELECTRICAL DETAILS
E4.3 ELECTRICAL DETAILS
E5.1 TITLE 24
E5.2 TITLE 24
E5.3 TITLE 24
PV0.1 ELECTRICAL PV SYMBOLS
PV0.2 ELECTRICAL PV NOTES
PV0.3 ELECTRICAL PV LABELS
PV1.0 SOLAR LAYOUT
PV2.0 PV SINGLE LINE DIAGRAM
PV2.1 DC SCHEMATIC DIAGRAM
PV3.0 PV SPECIFICATIONS
PV4.0 PV CALCULATIONS
No. Description
T-1 TITLE SHEET
T-2 TITLE SHEET
T-3 ACCESSIBILITY DETAILS
T-4 ACCESSIBILITY DETAILS
T-5 ACCESSIBILITY DETAILS
T-6 SIGNAGE ACCESSIBILITY DETAILS
T-7 SITE ACCESSIBILITY DETAILS
T-8 CALGREEN COMPLIANCE
C1.0 GENERAL CIVIL NOTES
C1.1 GENERAL CIVIL NOTES
C2.0 TYPICAL DETAILS
C2.1 TYPICAL DETAILS
C2.2 R-TANK DETAILS
C2.3 SITE SECTIONS
C3.0 DEMOLITION PLAN
C4.0 GRADING AND DRAINAGE PLAN
C5.0 WET UTILITY PLAN
C6.0 FINE GRADING AND PAVING PLAN
C7.0 HORIZONTAL CONTROL PLAN
C8.0 DMA/BMP SITE PLAN
C8.1 BMP MAINTANANCE PLAN
C9.0 EROSION CONTROL NOTES
C9.1 EROSION CONTROL PLAN
LT-1 LANDSCAPE TITLE SHEET
LP-1 LANDSCAPE PLANTING & CONSTRUCTION LEGENDS
LP-2 LANDSCAPE CONSTRUCTION PLAN
LP-3 LANDSCAPE CONSTRUCTION DETAILS
LP-4 LANDSCAPE PLANTING PLAN
LP-5 LANDSCAPE PLANTING DETAILS
LP-6 LANDSCAPE PLANTING DETAILS
LP-7 LANDSCAPE ADDITIONAL PLANTING NOTES AND SPECIFICATIONS LI-1 LANDSCAPE IRRIGATION LEGEND AND NOTES
LI-2 LANDSCAPE IRRIGATION PLAN
LI-3 LANDSCAPE IRRIGATION DETAILS AND NOTES
LI-4 LANDSCAPE IRRIGATION DETAILS AND NOTES
LI-5 HYDROZONE IRRIGATION PLAN
A0.1 EGRESS PLAN
A1.0 DEMOLITION SITE PLAN
A1.1 SITE PLAN
A1.2 ENLARGED SITE PLAN
A1.3 PATIO DETAILS
A1.4 SITE DETAILS
A1.5 SITE DETAILS
A1.6 SITE DETAILS
A2.1 FLOOR PLAN
A2.2 DIMENSION PLAN
A2.3 REFLECTED CEILING PLAN
A2.4 ROOF PLAN
A2.5 SLAB PLAN
A3.1 EXTERIOR ELEVATIONS
A3.2 EXTERIOR ELEVATIONS
A4.1 BUILDING SECTIONS
A4.2 BUILDING SECTIONS
A4.3 WALL SECTIONS
A4.4 WALL SECTIONS
A4.5 WALL SECTIONS
A4.6 WALL SECTIONS
A4.7 WALL TYPES
A4.8 WALL TYPES
A4.9 WALL TYPES
A5.1 ENLARGED PLANS & INTERIOR ELEVATIONS
A5.2 ENLARGED PLANS & INTERIOR ELEVATIONS
A5.3 ENLARGED PLANS & INTERIOR ELEVATIONS
A5.4 ENLARGED PLANS & INTERIOR ELEVATIONS
A6.1 FINISH SCHEDULES
A6.2 DOOR AND WINDOW SCHEDULE
A6.3 STOREFRONT SCHEDULE
A7.1 DOOR & STOREFRONT DETAILS
A7.2 DOOR & STOREFRONT DETAILS
A7.3 STOREFRONT AND WINDOW DETAILS
A7.4 ROOFING DETAILS
A7.5 ROOF DETAILS
A7.6 CURB DETAILS
A7.7 DETAILS
A7.8 DETAILS
A7.9 DETAILS
A7.10 DETAILS
SYMBOLS
FIRENOTESGENERALNOTESABBREVIATIONS SHEET INDEX
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 193 of 357
36 M
A
X
A
C
C
ESSIB
LE
38 4
3 STA
N
D
IN
G
P
ER
SO
N
S
27 17 M
A
X
40 M
A
X
40 44
M
A
X
19 40
M
A
X
TO
R
EFLEC
TIV
E
SU
R
FA
C
E
IF
O
V
ER
C
O
U
N
TER
O
R
LA
V
A
TO
R
Y
3 5
M
A
X
E
LSEW
H
ER
E
SPOUT. SPOUT SHALL BE
LOCATED 15" MIN.
FROM VERTICAL
SUPPORT AND 5" MAX
FROM FRONT EDGE OF
THE UNIT
TOILET TISSUE
PAPER TOWEL DISPENSER
WITH WASTE CONTAINER
PRIVACY
COVERS
DRINKING FOUNTAIN
MIRROR
27 M
IN
36 40
M
A
X
TO
H
IG
H
EST
O
P
ER
A
B
LE
P
A
R
T
HAND DRYER
FINISHED FLOOR
4'-
0 M
A
X
TO
H
A
N
D
LE
BABY CHANGING
STATION
34 M
A
X
M
IN
M
A
X
M
IN
MIN.
13 1/2"
ENTRANCES AND DOORS
THE HEIGHT OF ACCESSIBLE WATER CLOSETS SHALL BE A M INIMUM OF 17" AND A MAXIMUM OF 19" MEASURED TO THE TOP OF THE TOILET SEAT.
PROVIDE 17" MINIMUM - 18" MAXIMUM FROM THE CENTERLINE OF THE WATER CLOSET TO THE ADJACENT WALL.
TOILET AND URINAL FLUSH CONTROLS SHALL BE OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. CONTROLS FOR THE FLUSH VALVES SHALL BE MOUNTED ON THE OPEN (WIDE) SIDE OF THE TOILET STALL.
TOILET AND URINAL FLUSH CONTROLS SHALL BE NO MORE THAN 44" ABOVE THE FLOOR.
THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5 LBS.
WHERE URINALS ARE PROVIDED, AT LEAST ONE SHALL HAVE A CLEAR SPACE 30" WIDE BY 48" LONG IN FRONT OF THE URINAL. AT LEAST ONE URINAL WI TH 13 1/ 2" MIN. RIM PROJECTION FROM THE WALL AND A MAXIMUM OF 17" ABOVE THE FLOOR SHALL BE INSTALLED.
AMBULATORY STALLS ARE REQUIRED WHERE 6 OR MORE STALLS ARE PROVIDED WITHIN A
MULTIPLE ACCOMODATION TOILET ROOM OR WHERE THE COMBINATION OF URINALS AND WATER CLOSETS TOTALS SIX OR MORE FIXTURES. AMBULATORY ACCESSIBLE COMPARTMENTS SHALL BE 60" DEEP MIN. AND 35"MIN - 37" MAX WIDE. COMPARTMENT DOORS SHALL NOT SWING INTO THE MINIMUM REQUIRED COM PARTMENT AREA.
A CLEAR FLOOR SPACE 30" WIDE BY 48" LONG SHALL BE PROVIDED IN FRONT OF A LAVATORY TO ALLOW FORWARD APPROACH. SUCH CLEAR SPACE SHALL ADJOIN OR
OVERLAP AN ACCESSIBLE ROUTE AND SHALL EXTEND INTO KNEE AND TOE SPACE UNDERNEATH LAVATORY.
LAVATORIES SHALL BE MOUNTED WITH A CLEARANCE OF AT LEAST 29" FROM THE FLOOR TO THE BOTTOM OF THE APRON WITH 27" MINIMUM KNEE CLEARANCE UNDER THE FRONT LIP EXTENDING A MINIMUM OF 30" IN WIDTH WITH 8" MINIMUM DEPTH AT THE TOP. TOE CLEARANCE SHALL BE SAME WIDTH AND A MINIMUM OF 9 INCHES HIGH FROM THE FLOOR AND A MINIMUM OF 17"-19"MAXIMUM DEEP FROM THE FRONT OF THE LAVATORY.
HOT WATER AND DRAIN PIPES UNDER LAVATORIES SHALL BE INSULATED OR OTHERWISE COVERED. THERE SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORIES.
MIRRORS LOCATED ABOVE LAVATORIES OR COUNTERTOPS SHALL HAVE BOTTOM OF REFLECTIVE SURFACE 40" MAX. ABOVE FINISHED FLOOR; MIRRORS MOUNTED ELSEWHERE SHALL HAVE BOTTOM EDGE OF REFLECTIVE SURFACE 35" MAX. ABOVE FINISHED FLOOR.
TOP EDGE OF MIRRORS SHOULD BE 74" HIGH TO BE USEABLE BY AMBULATORY PEOPLE,
LOCATE PAPER TOWEL DISPENSERS, SANITARY NAPKIN DISPENSERS, AND WASTE RECEPTACLES WITH ALL OPERABLE PARTS NOT MORE THAN 40" FROM THE FLOOR.
LOCATE TOILET TISSUE DISPENSERS ON THE WALL 7-9" FROM THE FRONT OF THE WATER CLOSET TO THE CENTERLINE OF THE DISPENSER. THE OUTLET OF THE DISPENSER SHALL BE 19" MIN. ABOVE FINISHED FLOOR AND SHALL NOT BE LOCATED BEHIND GRAB BARS.
DISPENSERS SHALL NOT BE OF A TYPE THAT CONTROLS DELIVERY OR THAT DOES NOT ALLOW CONTINIOUS PAPER FLOW.
DOORS CANNOT SWING INTO THE REQUIRED CLEAR FLOOR SPACE AT ANY FIXTURE OTHER
THAN THE DOOR TO THE ACESSIBLE WATER CLOSET COMPARTMENT, A DOOR, IN ANY POSITION, MAY ENCROACH INTO THE TURNING SPACE BY 12" MAX CLEARANCE AROUND WATER CLOSET SHALL BE 60" WIDE x 56" DEEP PROVIDED IN FRONT OF THE WATER CLOSET, NO OTHER FIXTURES CAN BE LOCATED WITHIN THIS AREA. A MIN. 60" WIDE AND 48" DEEP MANEUVERING SPACE SHALL BE PROVIDED IN FRONT OF THE WATER CLOSET.
SANITARY NAPKIN DISPOSAL UNITS, IF PROVIDED, SHALL COMPLY WITH SECTION 11B-309.4
AND SHALL BE WALL MOUNTED AND LOCATED ON THE SIDE WALL BETWEEN THE REAR WALL
OF THE TOILET AND THE TOILET PAPER DISPENSER, ADJACENT TO THE TOILET PAPER DISPENSER. THE DISPOSAL UNIT SHALL BE LOCATED BELOW THE GRAB BAR WITH THE OPENING OF THE DISPOSAL UNIT 19 INCHES MINIMUM ABOVE THE FINISH FLOOR.
TOILET ROOM FIXTURES AND ACCESSORIES
ALL DOORWAYS LEADING TO SANITARY FACILITIES SHALL HAVE 32" CLEAR, UNOBSTRUCTED OPENINGS.
ALL SINKS, FAUCET CONTROLS, AND OPERATING MECHANISM S SHALL BE OPERABLE WITH
ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL BE NO GREATER THAN 5 LBS.
LEVER-OPERATED, PUSH TYPE, AND ELECTRONICALLY CONTROLLED MECHANISMS ARE EXAMPLES OF ACCEPTABLE DESIGNS. SELF-CLOSING VALVES ARE ALLOWED IF THE FAUCET REMAINS OPEN FOR AT LEAST 10 SECONDS.
LAVATORIES SHALL BE MOUNTED WITH A MINIMUM DISTANCE OF 18" FROM A WALL OR PARTITION TO THE CENTER OF THE FIXTURE. ACCESSIBLE LAVATORIES SHALL BE MOUNTED WITH THE RIM AND/OR COUNTER SURFACE NO HIGHER THAN 34" ABOVE THE FLOOR.
SANITARY FACILITIES (GENERAL)
THE FLOOR OR LANDING LENGTH ON EACH SIDE OF AN ENTRANCE OR A PASSAGE DOOR SHALL BE LEVEL AND CLEAR AT LEAST 60" IN THE DIRECTION OF THE DOOR SWING AND AT LEAST 48" OPPOSITE THE DIRECTION OF THE DOOR SWING AS MEASURED AT RIGHT ANGLES TO THE FACE OF THE DOOR IN THE CLOSED POSITION. THE WIDTH OF THE LEVEL AND CLEAR AREA ON THE SIDE WHICH THE DOOR SWINGS SHALL EXTEND A MINIMUM OF 24" PAST THE STRIKE EDGE OF THE DOOR FOR DOORS WITH LATCH SIDE APPROACH AND 36" FOR DOORS REQUIRING HINGE SIDE APPROACH. REFER TO DETAIL B3 ON THIS DRAWING FOR ADDITIONAL CLEARANCE REQUIREMENTS.
THE FLOOR OR LANDING SHALL NOT BE MORE THAN 1/2" LOWER THAN THE THRESHOLD OF THE DOORWAY. CHANGES IN LEVEL BETWEEN 1/ 4" AND 1/ 2" SHALL BE BEVELED WITH A SLOPE NO GREATER THAN 1:2.
THE BOTTOM 10" OF ALL DOORS (EXCEPT SLIDING) SHALL HAVE A SMOOTH UNINTERRUPTED
SURFACE TO ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT
CREATING A TRAP OR HAZARDOUS CONDITION WHERE NARROW FRAME DOORS ARE USED, A 10" HIGH SMOOTH PANEL SHALL BE INSTALLED ON THE PUSH SIDE OF THE DOOR, WHICH WILL ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST. SURFACES ALONG THIS AREA MUST BE WITHIN 1/16" OF THE SAME PLANE AS THE OTHER. CAVITITES CREATED BY KICK PLATES MUST BE CAPPED.
THE MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 LBS. FOR EXTERIOR DOORS AND 5 LBS. FOR INTERIOR DOORS. SUCH PULL OR PUSH EFFORT BEING APPLIED AT RIGHT ANGLES TO HINGED DOORS AND AT THE CENTER PLANE OF SLIDING OR FOLDING DOORS.
COMPENSATING DEVICES OR AUTOMATIC DOOR OPERATORS MAY BE UTILIZED TO MEET THE ABOVE STANDARDS. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM EFFORT TO OPERATE THE DOOR MAY NOT EXCEED 15 LBS.
DOOR CLOSERS REQUIRE AT LEAST 5 SECONDS TO CLOSE FROM AN OPEN POSITION OF 90 DEGREES TO 12 DEGREES FROM THE LATCH
EACH GRADE-LEVEL EXTERIOR EXIT DOOR SHALL BE IDENTI FIED BY A TACTILE SIGN WITH THE WORD "EXIT". EACH EXIT DOOR THAT LEADS DIRECTLY TO GRADE-LEVEL EXTERIOR EXIT BY MEANS OF STAIRWAY OR RAMP IS IDENTIFIED BY A TACTILE SIGN THAT STATES "EXIT STAIR DOWN," "EXIT RAMP DOWN," "EXIT STAIR UP," OR "EXIT RAMP UP" AS APPROPRIATE. EACH EXIT
DOOR THAT LEADS DIRECTLY TO GRADE-LEVEL EXTERIOR EXIT BY MEANS OF AN EXIT
ENCLOSURE OR EXIT PASSAGEWAY IS IDENTIFIED BY A TACTILE EXIT SIGN WITH THE WORDS EXIT ROUTE". EACH ACCESS DOOR FROM AN INTERIOR ROOM OR AREA TO A CORRIDOR
OR HALLWAY THAT IS REQUIRED TO HAVE A VISUAL EXIT SIGN IS IDENTIFIED BY A TACTILE EXIT SIGN WITH THE WORDS "EXIT ROUTE". EACH DOOR THROUGH AN HORIZONTAL EXIT IS IDENTIFIED BY A TACTILE EXIT SIGN WITH THE WORDS "TO EXIT".
VISION LIGHTS MUST HAVE BOTTOM OF AT LEAST ONE GLAZED PANEL LOCATED 43" MAX.
ABOVE FLOOR FINISH.
6. 7.
8. 9.
10. 11.
12. 1.
2. 3.
GRAB BARS SHALL BE LOCATED ON ONE SIDE AND THE BACK OF THE PHYSICALLY DISABLED TOILET STALL OR COMPARTMENT AND SHALL BE SECURELY ATTACHED 33" MINIMUM-36"
MAXIMUM, MEASURED TO THE TOP OF GRIPING SURFACE, ABOVE AND PARALLEL TO THE FLOOR.
GRAB BARS AT THE SIDE SHALL BE AT LEAST 42" LONG WI TH THE FRONT END POSITIONED 54"MINIMUM FROM THE BACK OF THE STALL AND WITH THE FRONT END POSITIONED 24" MINIMUM IN FRONT OF THE WATER CLOSET. THE SIDE GRAB BAR SHALL BE LOCATED 12" MAXIMUM FROM THE REAR WALL. GRAB BARS AT THE BACK SHALL NOT BE LESS THAN 36" LONG AND SHALL EXTEND FROM THE CENTERLINE OF THE WATER CLOSET 12" MINIMUM ON ONE SIDE AND 24"MINIMUM ON THE OTHER SIDE.
THE DIAMETER OR WIDTH OF THE GRIPPING SURFACES OF A GRAB BAR WITH CIRCULAR CROSS SECTIONS SHALL HAVE AN OUTSIDE DIAMETER OF 1 1/4"MIN AND 2" MAXIMUM.
GRAB BARS WITH NON CIRCULAR CROSS SECTIONS SHALL HAVE A CROSS SECTION DIMENSION OF 2" MAXIMUM AND A PERIMETER DIMENSION OF 4" MIN AND 4.8" MAXIMUM.
IF THE GRAB BARS ARE MOUNTED ADJACENT TO A WALL, THE SPACE BETWEEN THE WALL AND THE GRAB BARS SHALL BE 1-1/2".
GRAB BARS, AND ANY WALL OR OTHER SURFACE ADJACENT TO IT, SHALL BE FREE OF ANY SHARP OR ABRASIVE ELEMENTS.
GRAB BARS SHALL NOT ROTATE WITHIN THEIR FITTINGS.
GRAB BARS SHALL BE DESIGNED TO SUPPORT A 250 POUND FORCE.
NO OBJECT TO BE MOUNTED WITHIN 1 1/2" BELOW OR 12" ABOVE ANY GRAB BAR.
A CLEAR SPACE, MEASURED FROM THE FLOOR TO A HEIGHT OF 27" ABOVE THE FLOOR,
WITHIN THE SANITARY FACILITY ROOM, OF SUFFICIENT SI ZE TO INSCRIBE A CIRCLE OF A DIAMETER NOT LESS THAN 60 INCHES, OR A T SHAPED SPACE IN ACCORDANCE WITH 11B-304.3.2 SHALL BE PROVIDED.
CLEARANCE AROUND A WATER CLOSET SHALL BE 60“ MIN. MEASURED PERPENDICULAR FROM THE SIDE WALL AND 56” MIN. MEASURED PERPENDICULAR FROM THE REAR WALL. A 48" LONG CLEAR SPACE IN FRONT OF WATER CLOSET SHALL BE PROVIDED IF THE COMPARTMENT HAS AN END OPENING DOOR (FACING THE WATER CLOSET). A 60" LONG
CLEAR SPACE SHALL BE PROVIDED IN COMPARTMENT WHEN DOOR IS LOCATED AT THE SIDE. GRAB BARS SHALL NOT PROJECT MORE THAN 3" INTO CLEAR SPACE SPECIFIED ABOVE.
WATER CLOSET COMPARTMENT SHALL BE EQUIPPED WITH DOOR THAT HAS AN AUTOMATIC CLOSING DEVICE, AND A CLEAR UNOBSTRUCTED OPENING WI DTH OF 32" WHEN LOCATED AT THE END, AND 34" WHEN LOCATED AT SIDE, WHEN THE DOOR IS POSITIONED AT AN ANGLE OF 90 DEGREES FROM ITS CLOSED POSITION.
EXCEPT FOR DOOR OPENINGS, A CLEAR UNOBSTRUCTED ACCESS NOT LESS THAN 44" SHALL BE PROVIDED TO ALL WATER CLOSET COMPARTMENTS DESIGNED FOR USE BY THE DISABLED.
THE SPACE IMMEDIATELY IN FRONT OF A WATER CLOSET COMPARTMENT SHALL BE NOT LESS THAN 48" AS MEASURED AT RIGHT ANGLES TO THE COMPARTMENT DOOR IN ITS CLOSED POSITION.
THE WATER CLOSET AND DOOR MANEUVERING CLEARANCE CANNOT OVERLAP IN THE ACCESSIBLE STALL.
STALL DOORS TO BE HINGED 4" MAXIMUM OPPOSITE THE WATER CLOSET FOR FRONT OR SIDE OPENING DOORS.
STALL DOORS CANNOT SWING INTO THE REQUIRED CLEAR AREA AT THE WATER CLOSET.
A DOOR PULL SHALL BE PLACED ON BOTH SIDES OF THE DOOR NEAR THE LATCH.
MULTIPLE ACCOMMODATION TOILET ROOMS
WALKS AND SIDEWALKS SHALL HAVE A CONTINUOUS COMMON SURFACE NOT INTERRUPTED BY STEPS OR BY ABRUPT CHANGES IN LEVEL WHICH EXCEED 1/4", AND SHALL BE A MINIMUM OF 48" IN WIDTH.
SURFACE CROSS SLOPES SHALL NOT EXCEED 2%. THE RUNNI NG SLOPE OF WALKING SURFACES SHALL NOT BE STEEPER THAN 5%.
OPENINGS IN FLOOR OR GROUND SURFACES SHALL NOT ALLOW PASSAGE OF A SPHERE MORE THAN 1/ 2" DIAMETER. ENLONGATED OPENINGS SHALL BE PLACED SO THAT THE LONG DIMENSION IS PERPENDICULAR TO THE DOMINANT DIRECTION OF TRAVEL.
WHEN THE SLOPE IN THE DIRECTION OF TRAVEL OF ANY WALK EXCEEDS 1 VERTICAL TO 20 HORIZONTAL, IT SHALL COMPLY WITH THE PROVISIONS OF RAMPS.
WHEN ABRUPT CHANGES IN LEVEL NOT EXCEEDING 1/2" OCCUR, THEY SHALL BE BEVELED WITH A SLOPE NO GREATER THE 1 UNIT VERTICAL TO 2 UNITS HORIZONTAL (50%), EXCEPT THAT LEVEL CHANGES NOT EXCEEDING 1/4" MAY BE VERTICAL.
ABRUPT CHANGES IN LEVEL ALONG ANY ACCESSIBLE ROUTE EXCEEDING 1/2" SHALL COMPLY WITH THE REQUIREMENTS FOR CURB RAMPS AND RAM PS.
WALKS SHALL BE PROVIDED WITH A LEVEL AREA NOT LESS THAN 60" x 60" AT A DOOR OR GATE THAT SWINGS TOWARD THE WALK, AND NOT LESS THAN 48" x 44" DEEP AT A DOOR OR GATE THAT SWINGS AWAY FROM THE WALK.
WALKS SHALL EXTEND A MINIMUM OF 24" TO THE SIDE OF THE STRIKE EDGE OF A DOOR OR GATE THAT SWINGS TOWARD THE WALK.
WALK AND SIDEWALK SURFACES SHALL BE STABLE, FIRM, AND SLIP-RESISTANT.
ABRUPT CHANGES IN LEVEL 4" OR MORE IN A VERTICAL DI MENSION BETWEEN WALKS,
SIDEWALKS OR OTHER PEDESTRIAN WAYS AND ADJACENT SURFACES OR FEATURES SHALL BE IDENTIFIED BY A 6" MIN. HIGH CURB ABOVE WALK SURFACE OR GUARDRAIL W/ 2"-4"
CENTERED HIGH GUIDE RAIL
ACCESSIBLE PARKING SPACES SHALL BE LOCATED ON THE SHORTEST ACCESSIBLE ROUTE TO AN ACCESSIBLE ENTRANCE.
SURFACE SLOPES OF PARKING SPACES FOR THE PHYSICALLY DISABLED SHALL NOT EXCEED 1/ 4 INCH PER FOOT (2% GRADIENT) IN ANY DIRECTION.
DISABLED PARKING SPACES SHALL BE LOCATED SO AS NOT TO REQUIRE USERS TO WHEEL
OR WALK BEHIND ANY OTHER NON-DISABLED OR DISABLED PARKING SPACE, OTHER THAN TO PASS BEHIND THE PARKING SPACE IN WHICH THEY PARKED.
IN EACH PARKING AREA, A BUMPER OR CURB SHALL BE PROVIDED AND LOCATED TO
PREVENT ENCROACHMENT OF CARS OVER THE REQUIRED WIDTH OF ADJACENT ACCESSIBLE ROUTES.
PARKING SPACES RESERVED FOR PERSONS WITH DISABILITI ES SHALL BE IDENTIFIED BY A
REFLECTORIZED SIGN PERMANENTLY POSTED IMMEDIATELY ADJACENT TO AND VISIBLE
FROM EACH STALL OR SPACE, CONSISTING OF A PROFILE VIEW OF A WHEELCHAIR WITH OCCUPANT, IN WHITE ON DARK BLUE BACKGROUND. THE SI GN SHALL NOT BE SMALLER THAN 70" IN AREA AND, WHEN IN THE PATH OF TRAVEL, SHALL BE POSTED AT A MINIMUM HEIGHT OF 80" FROM THE BOTTOM OF THE SIGN TO THE PARKING SPACE FINISHED GRADE. WHEN NOT IN THE PATH OF TRAVEL SIGNS MAY ALSO BE ON THE WALL AT THE INTERIOR END OF THE PARKING SPACE AT A MIN. HEIGHT OF 60" FROM THE PARKING
SPACE FINISHED GRADE, GROUND, OR SIDEWALK MEASURED TO THE BOTTOM OF THE SIGN.
ADDITIONAL LANGUAGE OR AN ADDITIONAL SIGN BELOW THE ISA SHALL STATE MINIMUM FINE $250"
VAN ACCESSIBLE SPACES SHOULD BE IDENTIFIED WITH THE ADDITIONAL WORDS "VAN ACCESSIBLE" ON THE SPACE IDENTIFICATION SIGN. ONE IN EVERY SIX ACCESSIBLE SPACES, BUT NEVER LESS THAN ONE, MUST BE VAN ACCESSIBLE.
OBJECTS WITH LEADING EDGES BETWEEN 27" AND 80" ABOV E THE FINISHED FLOOR SHALL PROTRUDE NO MORE THAN 4" INTO CIRCULATION PATH.
OBJECTS MOUNTED WITH THEIR LEADING EDGES AT OR BELOW 27" ABOVE THE FINISHED FLOOR MAY PROTRUDE ANY AMOUNT.
OBJECTS MOUNTED ON POSTS / PYLONS MAY OVERHANG 12" MAXIMUM FROM 27" TO 80" ABOVE THE GROUND OR FINISHED FLOOR.
PROTRUDING OBJECTS SHALL NOT REDUCE THE REQUIRED CLEAR WIDTH OF AN ACCESSIBLE ROUTE OR MANEUVERING SPACE.
ANY OBSTRUCTION OVERHANGING A PEDESTRIAN WAY SHALL BE A MINIMUM OF 80" ABOVE THE WALKING SURFACE AS MEASURED TO THE BOTTOM OF THE OBSTRUCTION.
GUARDRAILS OR OTHER BARRIERS SHALL BE PROVIDED WHERE THE VERTICAL CLEARANCE IS LESS THAN 80". SUCH GUARDRAILS SHALL BE LOCATED 27" MAX ABOVE FINISHED FLOOR.
WALKS AND SIDEWALKS
PARKING
HAZARDS AND PROTRUDING OBJECTS
MINIMUM CLEAR FLOOR OR GROUND SPACE REQUIRED TO ACCOMMODATE A SINGLE, STATIONARY WHEELCHAIR AND OCCUPANT IS 30" x 48". M INIMUM CLEAR FLOOR OR
GROUND SPACE FOR WHEELCHAIRS MAY BE POSITIONED FOR FORWARD OR PARALLEL APPROACH TO AN OBJECT. FLOOR OR GROUND SPACE FOR WHEEL CHAIRS MAY BE PART OF THE KNEE SPACE AND TOE CLEARANCE REQUIRED UNDER SOME OBJECTS. ONE
FULL UNOBSTRUCTED SIDE OF THE CLEAR FLOOR OR GROUND SPACE SHALL ADJOIN AN ACCESSIBLE ROUTE OR ADJOIN ANOTHER CLEAR FLOOR SPACE.
ALCOVES ARE TO BE 60" WIDE WHEN GREATER THAN 15" DEEP.
PROVIDE AN ADDITIONAL 6" WIDTH ON ONE SIDE FOR ALCOVES GREATER THAN 24" DEEP AND DESIGNED FOR FRONT APPROACH.
CLEAR FLOOR SPACE FOR WHEELCHAIRS
1. 2.
3. GRAB BARS
ALL PRIMARY ENTRANCES AND EXTERIOR GROUND FLOOR EXI T DOORS TO BUILDINGS AND FACILITIES SHALL BE MADE ACCESSIBLE TO THE PHYSICALLY DISABLED.
ALL ACCESSIBLE ENTRANCES SHALL BE IDENTIFIED WITH ONE STANDARD INTERNATIONAL
SYMBOL OF ACCESSIBILITY SIGN AND WITH ADDITIONAL DI RECTIONAL SIGNS IDENTIFYING
THE LOCATION OF NEAREST ACCESSIBLE ENTRANCE, AS REQUIRED, VISIBLE FROM APPROACHING PEDESTRIAN WAYS.
EVERY REQUIRED ENTRANCE OR PASSAGE DOORWAY SHALL BE OF A SIZE AS TO PERMIT THE INSTALLATION OF A DOOR NOT LESS THAN 36 INCHES IN WIDTH, AND NOT LESS THAN 80" IN HEIGHT. DOORS SHALL BE CAPABLE OF OPENING AT LEAST 90 DEGREES AND SHALL BE MOUNTED SO THAT THE CLEAR WIDTH OF THE DOORWAY I S NOT LESS THAN 32".
LATCHING AND LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN A
PATH OF TRAVEL, SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE,
PANIC BARS, PUSH-PULL ACTIVATING BARS, OR OTHER HARDWARE DESIGNED TO PROVIDE
PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP, PINCH OR TWIST THE OPENING HARDWARE AND MUST BE OPERABLE WITH ONE HAND.
THE OPERABLE PARTS OF LEVER HAND ACTIVATED DOOR OPENING HARDWARE SHALL BE MOUNTED BETWEEN 34" MINIMUM AND 44" MAXIMUM ABOVE THE FLOOR AND NOT REQUIRE MORE THAN 5 POUNDS OF FORCE TO OPERATE.
1. 2.
3. 4.
5. 1.
2. 3.
4. 5.
6. 7.
1. 2.
3. 4.
5. 6.
7. 8.
9. 10.
1. 2.
3. 4.
5. 1.
2. 3.
4. 5.
6. 7.
8. 9.
10. 11.
12. 13.
14. 1.
2. 3.
4. 5.
6. 7.
8. BASELINE OF THE HIGHEST LINE OF RAISED CHARACTER TO BE 60" MAXIMUM AND BASELINE OF THE LOWEST BRAILLE CELLS TO BE 48" MINIMUM ABOVE FINISHED FLOOR.
TACTILE ROOM IDENTIFICATION SIGNS SHALL BE LOCATED SO THAT A CLEAR FLOOR SPACE OF 18" MIN. x 18" MIN. CENTERED ON SIGN IS PROVIDED BEYOND THE ARC OF ANY DOOR SWING.
SIGNAGE
1. 2.
ADDITIONAL REQUIREMENTS
THE TOP OF THE BOX OF THE OPERATING HANDLE OF SWITCHES INTENDED TO BE USED BY
OCCUPANTS OF A ROOM OR AREA TO CONTROL LIGHTING AND RECEPTACLE OUTLETS,
APPLIANCES, OR COOLING, HEATING AND VENTILATING EQUIPMENT, SHALL COMPLY WITH SECTION 11B-308 EXCEPT THE LOW REACH SHALL BE MEASURED TO THE BOTTOM OF THE OUTLET BOX AND THE HIGH REACH SHALL BE MEASURED TO THE TOP OF THE OUTLET BOX.
ELECTRICAL RECEPTACLE OUTLETS ON BRANCH CIRCUITS OF 30 AMPERES OR LESS AND COMMUNICATION SYSTEM RECEPTACLES SHALL COMPLY WITH SECTION 11B-308 EXCEPT
THE LOW REACH SHALL BE MEASURED TO THE BOTTOM OF THE OUTLET BOX AND THE HIGH REACH SHALL BE MEASURED TO THE TOP OF THE OUTLET BOX.
HIGHEST OPERABLE PART OF FIRE ALARM INITIATING DEVI CES (BOXES) SHALL BE LOCATED NO LESS THAN 42" AND NOT MORE THAN 48" MEASURED VERTICALLY FROM ABOVE THE
LEVEL OF THE ADJACENT FLOOR, WORKING PLATFORM, GROUND SURFACE, OR SIDEWALK TO THE HIGHEST POINT OF THE ACTIVATING HANDLE OR LEVER OF THE BOTTOM.
INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL BE THE STANDARD USED TO IDENTIFY FACILITIES THAT ARE ACCESSIBLE TO AND USABLE BY PHYSICALLY DISABLED PERSONS. THE SYMBOL SPECIFIED ABOVE SHALL CONSIST OF A WHITE FIGURE ON BLUE BACKGROUND.
THE BLUE SHALL BE EQUAL TO COLOR NO. 15090 IN FEDERAL STANDARD 595C.
ALL CONTROLS TO BE 15" MIN. TO 48" MAX., REGARDLESS OF APPROACH. WHERE A HIGH
FORWARD REACH IS OVER AN OBSTRUCTION, THE CLEAR FLOOR SPACE SHALL EXTEND
BENEATH THE ELEMENT FOR A DISTANCE NOT LESS THAN THE REQUIRED REACH DEPTH OVER THE OBSTRUCTION. THE MAX. HIGH FORWARD REACH SHALL BE 48" MAX WHERE THE REACH DEPTH IS 20"MAX. WHERE THE REACH DEPTH EXCEEDS 20" THE HIGH FORWARD REACH SHALL BE 44" MAX. AND THE REACH DEPTH SHALL BE 25" MAX. WHERE A CLEAR FLOOR
SPACE ALLOWS FOR A PARALLEL APPROACH AND THE HIGH SIDE REACH IS OVER AN OBSTRUCTION THE HEIGHT OF THE OBSTRUCTION SHALL BE 34" MAX AND THE DEPTH SHALL BE 24" MAX. THE HIGH SIDE REACH SHALL BE 48" MAX FOR A REACH DEPTH OF 10" MAX.
WHERE THE REACH DEPTH EXCEEDS 10" THE HIGH SIDE REACH SHALL BE 46" MAX WITH A REACH DEPTH OF 24" MAX.
ACCESSIBLE PORTIONS OF SERVICE COUNTERS TO BE 28"-34" HIGH, 36" MIN. WIDE AND MUST EXTEND THE SAME DEPTH AS THE ADJACENT COUNTERSPACE.
WHERE LOCKERS ARE PROVIDED FOR THE PUBLIC, AT LEAST 5% BUT NO FEWER THAN 1 OF EACH TYPE SHALL BE ACCESSIBLE.
1. 2.
3. 4.
5. 6.
7. 1.
2. 3.
4. 5.
6. 7.
PROVIDE THIS
ADDITIONAL
SPACE IF DOOR IS
EQUIPPED WITH
BOTH A LATCH
AND A CLOSER
18" MIN. CLR
INT. DOORS
24" MIN. CLR
EXT. DOORS
M
IN
M
IN
48 6
0 CLEAR, LEVEL
FLOOR SPACE
1.5% MAX SLOPE
IN ANY DIRECTION
PUSH SIDE
PULL SIDE
MIN.
FRONT APPROACH
12"
HINGE SIDE APPROACH
MIN.
54"
MIN.
36"
LATCH SIDE APPROACH
M
IN
M
IN60
44 PUSH SIDE
PULL SIDE
M
IN
M
IN
60 44MIN.
24"
PUSH SIDE
PULL SIDE
48" MIN. WHEN
DOOR HAS A
LATCH &
CLOSER
MIN.
24"
48" MIN. WHEN
DOOR HAS A
CLOSER22" MIN.
CLEAR, LEVEL
FLOOR SPACE
1.5% MAX SLOPE
CLEAR, LEVEL
FLOOR SPACE
1.5% MAX SLOPE
17 1
9 24" MIN.
42" MIN. GRAB BAR
54" MIN.
7" - 9"
12"
MAX.
MOUNT TOILET PAPER DISPENSER WITHIN 7-9" OF SEAT FRONT TO CENTERLINE AND 19" MIN AFF. ALLOW AT LEAST 1 1/ 2" CLEAR BELOW GRAB BAR.
PROVIDE FLUSH CONTROLS ON WIDE SIDE OF TOILET.
FLUSH CONTROLS SHALL NOT OBSTRUCT GRAB BARS WITHIN 1 1/ 2" BELOW OR 12" ABOVE.
FLUSH CONTROLS SHALL NOT REQUIRE GRASPING, PINCHING OR TWISTING TO OPERATE AND SHALL NOT REQUIRE GREATER THAN 5# OF FORCE.
FLUSH CONTROLS SHALL BE OPERABLE WITH ONE HAND.
FAUCET CONTROLS SHALL NOT REQUIRE GRASPING, PINCHING OR TWISTING TO OPERATE AND SHALL NOT REQUIRE GREATER THAN 5# OF FORCE.
SELF CLOSING FAUCET VALVES SHALL REMAIN OPEN FOR A MIN OF 10 SECONDS.
RESTROOM ACCESSORIES - HIGHEST OPERABLE PART SHALL BE 40" MAX. AFF.
PROVIDE 5/ 8" U-SHAPED HANDLE ON INSIDE AND OUTSIDE OF TOILET COMPARTMENT DOOR NEAR THE LATCH.
COMPARTMENTS SHALL BE ARRANGED FOR LEFT-HAND OR RIGHT-HAND
APPROACH TO THE WATER CLOSET
33 36
TO
TO
P
19 M
IN
TOILET PAPER
HOLDER
1. 2.
3. 4.
5. 6.
7. 8.
9. 10.
FINISHED FLOOR
NOTES
GRAB BAR
42" MIN.
60" MIN.
32" MIN.
42" MIN.
CENTERLINE OF ROLL
PAPER HOLDER
WITHOUT STOPS
7"
9 60
M
IN
M
A
N
EU
V
ER
IN
G
SP
A
C
E
42 M
IN
54 M
IN
6" MAX
12 17" MIN
M
A
X
WALL, LAVATORY, OR
TOILET PARTITION
WHERE OCCURS)
CONTROLS FOR
WATER CLOSETS SHALL
BE ON THE OPEN SIDE
CLR. OPENING
2'-10"
24 M
IN48
M
IN
W
H
EN
D
O
O
R
SW
IN
G
S
IN
18" MIN
FOR 60"
DEEP
36" MIN.
12" MIN. 24" MIN.
4" MAX. AT TOILET
COMPARTMENT
WITHIN A MULTI-
ACCOMMODATION
FACILITY
18" MAX
ALTERNATE DOOR
LOCATION, FOR SIDE
OPENING DOOR,
SEE
T-4
C3
M
IN.
1 1/
2" .
95 M
IN
FO
R
FLO
O
R
M
O
U
N
TE
D
TO
ILETS
W
H
EN
D
O
O
R
SW
IN
G
S
IN
92 M
IN
FO
R
W
A
LL
M
O
U
N
TED
TO
ILETS
W
H
EN
D
O
O
R
SW
IN
G
S
IN
36 M
IN
W
H
E
N
D
O
O
R
SW
IN
G
S
IN
DOOR PERMITTED
TO SWING OVER
HATCHED
PORTION OF
MANEUVERING
SPACE
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ACCESSIBILITY
DETAILS
200102
T-3
BC
JK
MM
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3/ 4" = 1'-0"T-3
A3 MOUNTING HEIGHT REQUIREMENTS
SCALE:1/ 8" = 1'-0"T-3
D1 DISABLED ACCESS REQUIREMENTS
SCALE:1/ 2" = 1'-0"T-3
B3 REQUIRED CLEARANCES
SCALE:1" = 1'-0"T-3
D3 RESTROOM CLEARANCES
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 194 of 357
A U-SHAPED HANDLE
NOTE:
THE INSIDE AND OUTSIDE OF THE COMPARTMENT DOORS TO ACCESSIBLE STALLS MUST BE EQUIPPED WITH A LOOP OR U-SHAPED HANDLE NEAR THE LATCH. THE
LATCH MUST BE FLIP-OVER STYLE, SLIDING OR OTHER HARDWARE OPERABLE
W/ONE HAND AND NOT REQUIRING TIGHT GRASPING, PINCHING, OR TWISTING
TO OPERATE
B LOOP HANDLE
34 M
IN
44 M
A
X
NOTES:
1. 2.
3. 4.
5. 6.
DOORS TO THE ACCESSIBLE WATER, CLOSET COMPARTMENTS SHALL BE EQUIPPED WITH A SELF CLOSING DEVICE.
IF STANDARD COMPARTMENTS ARE USED, PROVIDE SELF CLOSING DEVICES. IF NON-STANDARD COMPARTMENT DOORS ARE USED, PROVIDE CLEARANCE AT THE STRIKE EDGE.
REQUIRED CLEAR OPENINGS FOR ACCESSIBLE STALL DOORS ARE AS FOLLOWS - SIDE ENTRY 34" CLEAR MIN - END ENTRY 32" CLEAR MIN.
PROVIDE 18x60 DOOR MANEUVERING CLEARANCE ON OUTSWINGING STALL DOORS.
U-SHAPED HARDWARE TO BE PROVIDED ON BOTH SIDES OF THE DOOR NEAR THE LATCH.
STALL DOOR CANNOT SWING INTO THE REQUIRED CLEAR FLOOR SPACE AT THE WATER CLOSET.
PILASTER
DOOR
HEADRAIL
FIN. FLOOR
9"
M
IN
CL
R SEE PLAN FOR HINGE SIDE
NOTES:
1. THE CONTROLS FOR THE FLUSH VALVE SHALL BE:
A. OPERABLE WITH ONE HAND.
B. NOT REQUIRE TIGHT GRASPING, PINCHING OR TWIST OF THE WRIST.
C. BE MOUNTED ON THE WIDE SIDE OF THE TOILET.
D. BE MOUNTED AT 44" A.F.F. MAXIMUM
E. ACTIVATED WITH A FORCE OF LESS THAN OR EQUAL TO 5 LBS.
F. ALLOW 1 1/2" CLEAR BELOW THE GRAB BAR TOPPING AND 12" CLEAR ABOVE GRAB BAR.
17"-18"
33 3
6 TO
TO
P
12"
MIN
36" MIN
12"
MIN
6"
MAX
19 M
IN
24" MIN
7"-9"
36" MAX
42" MIN12"
MAX
54" MIN.
17 TO
1933
3 6
TO
TO
P
FINISH SURFACE OF
WALL OR PARTITION
TOILET PAPER
HOLDER W/O STOPS
B SIDEVIEWAFRONTVIEW
MIRROR
SOLID SURFACE
BACKSPLASH
COUNTERTOP
BLOCKING
COUNTER MTD.
LAVATORY
INSULATE ALL
EXPOSED PIPING
NO SHARP OR
ABRASIVE
ELEMENTS UNDER
LAVATORY (COVER
ANGLE STOPS)
ROLLED EDGE
34" MAX. TO
HIGHEST
5"
M
A
X
8"
MIN
17"
MIN
6"
MAX
9"
M
IN
NOTE:
1.THE ACCESSIBLE LAVATORIES SHALL COMPLY WITH THE FOLLOWING:
A. THE FAUCETS CONTROLS, AND OPERATING MECHANISM ARE:
1. THE TYPE WHICH DOES NOT REQUIRE TIGHT GRASPING, PINCHING OR TWISTING OF THE WRIST & BE OPERABLE W/ONE HAND.
2. HAS AN OPERATING FORCE OF LESS THAN OR EQUAL TO 5 LBS.
B. IF SELF-CLOSING VALVES ARE USED, THEY SHALL REMAIN OPEN FOR GREATER THAN 10 SECONDS.
C. CLEAR FLOOR SPACE NOT TO EXTEND MORE THAN 19" UNDER LAVATORY.
EDGE OF
COUNTER
OR LAV RIM
29"
M
IN.
25" MAX.
17" MIN.
27"
M
IN.
ADJACENT
WALL
CLEAR
FLOOR
SPACE
30" MIN.
48"
M
IN.
17"
M
IN.
18" MIN.
60 M
IN
C
LR
36 M
IN
17 M
IN
1 8
M
A
X
6"
M
A
X12"
MAX
42" MIN.
24" MIN. CLR
32 M
IN
C
LR
42 M
IN
C
LR
36" MIN. CLR
WHEN DOOR SWINGS IN
34" MIN. CLR
60" MIN.
54" MIN.
4"
MAX
59" CLR WITH
FLOOR-MOUNTED TOILET
56" CLR WITH WALL-HUNG TOILET
WITH INSWING DOOR
18" MIN
FOR 60" DEEP
42 M
IN
C4-B
T-4
C4-A
T-4
B1
T-4
24 M
IN
12 M
IN
6" MAX.
TOE
CLEARANCE
8"
MIN.
KNEE
CLEARANCE
17"
MIN
34 M
A
X
29 M
IN
27 M
IN
MIRROR
WALL
INSULATE ALL
EXPOSED PIPING
NO SHARP OR
ABRASIVE
ELEMENTS UNDER
LAVATORY (COVER
ANGLE STOPS)
NOTE:
1. THE ACCESSIBLE LAVATORIES SHALL COMPLY WITH THE FOLLOWING:
A. THE FAUCETS CONTROLS, AND OPERATING MECHANISM ARE:
1. THE TYPE WHICH DOES NOT REQUIRE TIGHT GRASPI NG, PINCHING OR TWISTING OF THE WRIST.
2. HAS AN OPERATING FORCE OF LESS THAN OR EQUAL TO 5 LBS.
3. BE OPERABLE WITH ONE HAND
B. IF SELF-CLOSING VALVES ARE USED, THEY SHALL REMAIN OPEN FOR GREATER THAN 10
SECONDS
9"
M
IN
ADJACENT
WALL
CLEAR
FLOOR
SPACE
30" MIN.
48"
M
IN.
19"
M
AX.
17"
M
IN.
18" MIN.
60" MIN.
CLEAR
FLOOR SPACE
FOLDING
SEAT,
SEE
CL
1/ 2" MAX. THRESHOLD,
WITH MAX. 1:2 SLOPE
SID
E
SEA
T
W
A
LL
BACK / CONTROL WALL
FAC
E
O
F
FINISH
30"
M
IN.
36"
M
IN.
19" MIN.- 27" MAX.
CENTERLINE OF
CONTROLS OR HAND-
HELD SPRAYER
MOUNTING BRACKET
60" MIN. FACE OF FINISH
SID
E
W
A
LL
FOR SHOWER ELEVATION,
REFERENCE
T-4
A4
1"
1 1
2 1" - 1 1/ 2"
1/4" MAX. GRATE
OPENINGS, DRAINS
TO BE FLUSH WITH
FLOOR SURFACE
T-4
A2
BACK / CONTROL WALL
SINGLE LEVER MIXING
VALVE CONTROL
L
18"33"-
36"
TO
TO
P
FOLDING SEAT
C
39"-
41"
M
O
UNTING
BRAC
KET
48"
M
AX
TO
TO
P
O
F
27" MAX.
MAX 1:50 (2%) SLOPE IN ANY DIRECTION
FLEXIBLE HAND-HELD SPRAYER UNIT WITH
HOSE AT LEAST 59" LONG THAT CAN BE
USED BOTH AS A FIXED SHOWER HEAD AND
AS A HAND-HELD SHOWER
19" MIN.
27" MAX.
O
F
C
O
NTRO
LS
48"
M
AX
TO
TO
P
34"
MAX.
MAXIMUM HEIGHT
TO COUNTER OR RIM
27" MIN.
MINIMUM HEIGHT
OF KNEE
CLEARANCE AT
SINK
MINIMUM 30" X 48"
CLEAR SPACE FOR
FRONT APPROACH
19" ABSOLUTE DEPTH OF
KNEE / TOE CLEARANCE
6-1/2" MAX.
DEPTH OF SINK
27" MIN.
MINIMUM 30" X 48" CLEAR
SPACE FOR FRONT APPROACH.
CLEAR FLOOR SPACE ADJOINS
AN ACCESSIBLE ROUTE.
19"
MIN.
TABLE OR COUNTER
HEIGHT:
28" MIN. TO
34" MAX.
30" MIN.
NOTES:
1. WHERE FOOD OR DRINK IS SERVED AT COUNTERS EXCEEDING 34" IN HEIGHT FOR CONSUMPTION BY CUSTOMERS SEATED OR STANDING AT THE COUNTER, A PORTION OF THE MAIN COUNTER WHICH IS 60" MINIMUM IN LENGTH SHALL BE PROVIDED.
2. WHEN A PARALLEL APPROACH IS PROVIDED KNEE CLEARANCE IS NOT REQUIRED.
3. PARALLEL APPROACH IS ALLOWED AT SALES AND SERVICES COUNTERS, NOT DINING AND WORK SURFACES. SEE
T-4
D3
PROVIDE MINIMUM 27"
HIGH, 30" WIDE, 19" DEEP
KNEE CLEARANCE AT
FORWARD APPROACH (NOT
REQUIRED AT PARALLEL
APPROACH)
34" MAX.
HEIGHT
WHERE A SINGLE COUNTER
CONTAINS MORE THAN ONE
TRANSACTION STATION, SUCH
AS (BUT NOT LIMITED TO) A
BANK COUNTER WITH MULTIPLE
TELLER WINDOWS OR RETAIL
SALES COUNTER WITH MULTIPLE
CASH REGISTER STATIONS, AT
LEAST 5 PERCENT (5%), BUT
NEVER LESS THAN ONE, OF
EACH TYPE OF STATION SHALL BE
LOCATED AT A SECTION OF
COUNTER THAT IS AT LEAST 36"
LONG AND NO MORE THAN
28"-34" HIGH
36"
MIN.
WIDTH
48"
MIN.
30"
MIN.
THE ACCESSIBLE COUNTERS SHALL BE THE SAME DEPTH AS STANDARD COUNTERS
PARALLEL APPROACH IS NOT ALLOWED AT DINING AND WORK SURFACES NOTE:
1. 2.
MINIMUM 48" X 3-" CLEAR SPACE FOR
PARALLEL APPROACH. CLEAR FLOOR
SPACE ADJOINS AN ACCESSIBLE ROUTE.
MIN.
60" TURNING SPACE
60"
M
IN.
24" MAX.
20" MIN
4'-
0"
M
IN.
78"
TYP.
84" TYP.
DOOR TO SWING OUT.
MANEUVERING CLEARANCES:
12"X 48" AT PUSH SIDE,
18" X 60" AT PULL SIDE
30" x 48" CLEAR
FLOOR SPACE
BENCH
17"-19"
AFF)
COAT HOOK,
48" MAX HEIGHT AFF.
MIRROR 18" WIDE MIN BY 54" HIGH
MAX AND SHALL BE MOUNTED IN A
POSITION AFFORDING A VIEW TO A
PERSON ON THE BENCH AS WELL AS
TO A PERSON IN A STANDING
POSITION. MIRROR TO BE INSTALLED
SO THAT BOTTOM OF REFLECTING
SURFACE IS 20" MAX AFF.
NOTE:
DOOR CLOSERS, IF PRESENT, MUST BE SET SO
THAT IT TAKES THE DOOR AT LEAST 5
SECONDS FROM 90 DEGREES TO 12
DEGREES FROM THE LATCH
CLOSER NOTE:
INTERIOR DOOR / EXTERIOR DOOR 5 LBS.
MAX FIRE RATED DOOR 15 LBS. MAX FORCE
TO OPERATE
90 DEGREES
5 SECONDS
MIN.
12 D
EG
REES
34 4
4 FLOOR
OPERABLE PARTS
OF HARDWARE
24" MIN.
1 1/2" MAX
2 1/
2"
M
AX.
15"
M
IN -
16"
M
AX
SE
A
T
W
A
LL
2 1/ 2" MAX
1 1/
2"
M
AX.
23" MAX.
22" MIN.
15"
M
AX.
14"
M
IN.
FULL
DEPTH
O
F
STALL
16" MAX.
15" MIN.(A) FOLDING SEAT AT 30
x 60 ROLL-IN SHOWER
B) FOLDING SEAT AT 36 x 60
ROLL-IN SHOWER
NOTES:
1. WHEN FOLDED, THE SHOWER SEAT DOES NOT EXTEND MORE THAN 6" FROM THE MOUNTING WALL.
2. SHOWER SEAT PROVIDES MINIMUM STRUCTURAL STRENGTH TO SUPPORT A 250 LB. POINT LOAD.
3. GRAB BARS ARE LOCATED ON WALLS ADJACENT TO AND OPPOSITE THE SEAT.
4. CONTINUOUS L-SHAPED GRAB BAR IS PROVIDED ALONG THE WALLS OPPOSITE FROM AND ADJACENT TO THE SEAT (BUT NOT TO EXTEND TO INCLUDED THAT PORTION OF WALL OVER THE SEAT.
5. THE TOP OF THE SEAT SHALL BE 17" MIN. AND 19" MAX. ABOVE FINISH FLOOR.
6. THE SEAT SHALL BE INSTALLED SO THAT IT EXTENDS TO A POINT WITHIN 3" OF THE COMPARTMENT ENTRY.
SID
E
C
O
N
TR
O
L
W
A
LL
FRONT / SEAT WALL
BACK /
CONTROL WALL
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ACCESSIBILITY
DETAILS
200102
T-4
BC
JK
MM
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/ 4" = 1'-0"T-4
B2 TOILET DOOR STALL HARDWARE
SCALE:1/ 4" = 1'-0"T-4
B1 TOILET STALL DOOR
SCALE:1/4" = 1'-0"T-4
C4 WATER CLOSET REQUIREMENTS
SCALE:1/ 2" = 1'-0"T-4
C1 COUNTER MOUNTED LAVATORY
SCALE:1/2" = 1'-0"T-4
C3 TOILET STALL - SIDE OPENING
SCALE:1/ 2" = 1'-0"T-4
C2 WALL MOUNTED LAVATORY
SCALE:3/4" = 1'-0"T-4
A3 ACCESSIBLE 30 X 60 ROLL-IN SHOWER
SCALE:1/2" = 1'-0"T-4
A4 ACCESSIBLE 30 X 60 ROLL-IN SHOWER - ELEVATION
SCALE:N.T.S.T-4
D1 ACCESSIBLE SINK
SCALE:N.T.S.T-4
D2 ACCESSIBLE TABLE OR COUNTER WITH FORWARD APPROACH
SCALE:N.T.S.T-4
D3 ACCESSIBLE SALES COUNTER WITH PARALLEL APPROACH
SCALE:3/8" = 1'-0"T-4
D4 DRESSING ROOM DETAIL
SCALE:1/ 4" = 1'-0"T-4
A1 ACCESSIBLE HARDWARE REQUIREMENTS
SCALE:1" = 1'-0"T-4
A2 SHOWER SEAT
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 195 of 357
5/8" TYPE "X" GYP. BD.
BOTH SIDES
STUDS W/ INSULATION
RECESSED FIRE
EXTINGUISHER CABINET
2ND LAYER 5/ 8" TYPE "X" GYP. BD. LINING
EXCEPT AT FIRE RATED WALLS)
NOTE:
1. CONFORM TO ALL REQUIREMENTS
OF #10 NFPA. TITLE 19 CCR & LOCAL
FIRE MARSHALL REQUIREMENTS
2. OPERABLE PARTS SHALL BE
OPERABLE W/ ONE HAND AND SHALL
NOT REQUIRE TIGHT GRASPING,
PINCHING OR TWISTING OF THE
WRIST. THE FORCE REQUIRED TO
ACTIVATE OPERABLE PARTS SHALL BE
5LBS MAX.
48" MAX. A.F.F. TO TOP OF
HANDLE (OR HIGHEST OPERABLE
PART)
5/ 8" TYPE "X" GYP. BD.
BOTH SIDES
STUDS W/ INSULATION
FIRE EXTINGUISHER, MOUNT
48" MAX. A.F.F. TO TOP OF
HANDLE (OR HIGHEST
OPERABLE PART)
PROVIDE 4x4 BLOCKING W/
SIMPSON A34 CLIP T & B
EACH END
FLO
O
R
FINISH
27"
M
AX.
TO
MOUNTING BRACKETS PER
SPEC
4" MAX
CLEARANCE
8" MIN. - KNEE 6" MAX. TOE CLEARANCE
DEPTH
17" MIN.
18" TO 19"
9"
M
IN.
27"
M
IN.
36"
M
AX. ***
EQUIPMENT PERMITTED
IN SHADED AREA
SPOUT HEIGHT AND KNEE CLEARANCE AT DRINKING FOUNTAINS
48" MIN.
32"
M
IN.
C
LR
18" MIN. **
CLEAR FLOOR SPACE AT DRINKING
FOUNTAIN ALCOVES
AT ALL ALCOVES DEEPER THAN 24" ADDITIONAL 6" MANEUVERING CLEARANCE IS REQUIRED, SEE CBC 11B-305.75"MAX 15" MIN.
11"MIN 9"MIN
NOTE: THE FLOW OF WATER SHALL BE ACTIVATED BY A MANUALLY OPERATED SYSTEM THAT IS FRONT OR SIDE MOUNTED AND LOCATED WITHIN 6" OF THE FRONT EDGE OF THE FOUNTAIN. THE SPOUT SHALL PROVIDE A FLOW OF WATER 4" HIGH MIN. AND SHALL BE LOCATED 5"MAX FROM THE FRONT OF THE UNIT. THE ANGLE OF THE WATER STREAM SHALL BE MEASURED HORIZONTALLY FROM THE FRONT. WHERE SPOUTS ARE LESS THAN 3" FROM THE FRONT THE ANGLE OF WATER SHALL BE 30 DEGREES MAX. WHERE SPOUTS ARE BETWEEN 3"-5" FROM FRONT THE ANGLE OF WATER SHALL BE 15 DEGREES MAX.
SPOUT HEIGHT FOR STANDING PERSONS
SHALL BE 38"HIGH MIN. AND 43"HIGH MAX.
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ACCESSIBILITY
DETAILS
200102
T-5
BC
JK
MM
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1" = 1'-0"T-5
D4 FIRE EXTINGUISHER CABINET
SCALE:1/2" = 1'-0"T-5
D3 DRINKING FOUNTAIN
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 196 of 357
1/4" THICK SOLID PLASTIC SIGN -
ATTACH W/ ADHESIVE, COLOR TO
MATCH
12 BRAILLE: GRADE 2
TEXT:5/ 8" HIGH MINIMUM -2" MAXIMUM,
UPPERCASE SANSERIF 1/32" RAISED LETTERS
POSITIONED DIRECTLY BELOW PICTOGRAM
BUT NOT IN PICTOGRAM FIELD
1/ 4" - WIDE RAISED 1/32" (EQ
TRIANGLE AND CIRCLE FOR
ALL-GENDER RESTROOM),
COLOR TO MATCH:
EXTERIOR - PT-7
INTERIOR - PT-3
INSTALLATION: SIGNS TO BE INSTALLED SO THAT TACTILE CHARACTERS ON SIGNS SHALL BE LOCATED 48" MINIMUM ABOVE FINISH FLOOR MEASURED FROM THE BASELINE OF THE LOWEST BRAILLE CELLS AND 60"
MAXIMUM CENTERED ABOVE FINISH FLOOR MEASURED FROM THE
HIGHEST LINE OF RAISED CHARACTERS.
TEXT
INSTALLATION: 58-60" CENTERED ABOVE
FINISH FLOOR, CENTER OF DOOR
COLOR OF PICTOGRAM:PICTOGRAMS &
THEIR FIELD SHALL HAVE A NON-GLARE
FINISH. PICTOGRAMS SHALL CONTRAST W/
THEIR FIELD W/ EITHER A LIGHT PICTOGRAM
ON A DARK FIELD OR A DARK PICTOGRAM
ON A LIGHT FIELD.
1/ 4" THICK SOLID PLASTIC SIGN -
ATTACH W/ADHESIVE, COLOR TO
MATCH PT-1
RESTROOMS
58 6
0 AF
F
GRADE 2 BRAILLE
NOTES:
1. DOOR SYMBOL AND TEXT SHOWN IS FOR SINGLE OCCUPANCY ALL- GENDER RESTROOM.
2. EDGES OF SIGNS SHALL BE ROUNDED, CHAMFERED OR EASED.
CORNERS OF SIGNS SHALL HAVE A MINIMUM RADIUS OF 1/ 8 INCH.
CIRCLE TO CONTRAST
WITH DOOR. TRIANGLE TO
CONTRAST WITH CIRCLE
6"
6"
60 M
A
X
AF
F
48 M
IN
AF
F
NOTES:
1. DESIGNATION SIGNS ARE NOT REQUIRED, BUT IF PROVI DED MUST COMPLY WITH SIGNAGE REQUIREMENTS, SEE DETAIL C1/T-6
2. THE FOLLOWING SIGNS ILLUSTRATE ACCEPTABLE EXAMPLES FOR DESIGNATION SIGN TEXT:
MEN WOMEN
12"
58 6
0 A
F
F
TO
C
EN
TER
LIN
E
1/ 4" THICK 12" EQUILATERAL
TRIANGLE COLOR TO
CONTRAST W/ DOOR
LETTERS 1/32" RAISED.
CONTRASTING W/
BACKGROUND
COLOR TO CONTRAST W/
DOOR COLOR
LETTERS 1/32" RAISED.
CONTRASTING W/ BACKGROUND.
1/4" THICK 12" DIA. COLOR TO
CONTRAST W/ DOOR
12"
1"
1"
6"6"
58 6
0 A
F
F
TO
C
EN
TER
LIN
E
NOTES:
1. ALL SIGNAGE SHALL CONFORM TO CBC & ADAAG
SEE DOOR SCHEDULE FOR LOCATIONS AND TEXT
WHERE A TACTILE SIGN IS PROVIDED AT A DOOR, THE SIGN SHALL BE LOCATED ALONGSIDE THE DOOR AT THE LATCH SIDE. WHERE A TACTILE IS PROVIDED AT DOUBLE DOORS WITH ONE ACTIVE LEAF, THE SIGN SHALL BE LOCATED ON THE INACTIVE LEAF. WHERE A TACTILE SIGN IS PROVIDED AT DOUBLE DOORS WITH TWO ACTIVE LEAF, THE SIGN SHALL BE LOCATED TO THE RIGHT OF THE RIGHT HAND DOOR. WHERE THERE IS NO WALL SPACE AT THE LATCH SIDE OF A SINGLE DOOR OR AT THE RIGHT SIDE OF DOUBLE DOORS, SIGNS SHALL BE LOCATED ON THE NEAREST ADJACENT WALL. SIGNS CONTAINING TACTILE CHARACTERS SHALL BE LOCATED SO THAT A CLEAR FLOOR SPACE OF 18" MINIMUM BY 18" MINIMUM, CENTERED ON THE TACTILE CHARACTERS, IS PROVIDED BEYOND THE ARC OF ANY DOOR SWING BETWEEN THE CLOSED POSITION AND 45 DEGREE OPEN POSITION. SIGNS IDENTIFYING PERMANENT ROOMS AND SPACES SHALL BE LOCATED AT THE ENTRANCE TO, AND OUTSIDE OF THE ROOM OR SPACE. WHERE PROVIDED, SIGNS IDENTIFYI NG EXITS SHALL BE LOCATED AT THE EXIT DOOR WHEN APPROACHED IN THE DIRECTION OF EGRESS TRAVEL.
2. 3.
TOILET
ROOM
SIGNAGE
B DOOR MOUNTEDSIGNSAWALLMOUNTEDSIGNS
ACTIVE
LEAF
ACTIVE
LEAF
ACTIVE
LEAF
58"-
60"
TO
C
ENTERLINE
REQUIRED AT SIGN
18" WIDE x 18" DEEP
CLEAR FLOOR SPACE
SIGN SIGN
REQUIRED AT SIGN
18" WIDE x 18" DEEP
CLEAR FLOOR SPACE
B.
O
BRAILLE
48"
M
IN
TO
TO
P
LINE
O
F
TEXT
60"
M
AX
TO
B.
O
ROOM
NAME
ROOM
NAME
ROOM
NAME
B.
O
BRAILLE
48"
M
IN
TO
TO
P
LINE
O
F
TEXT
60"
M
AX
TO
B.
O
A) SYMBOL PROPORTIONS (B) DISPLAY CONDITIONS
6".
6".
NOTE: PROVIDE ACCESSIBILITY SIGN AT ALL ACCESSIBLE ENTRANCE DOORS
THE INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL CONSIST OF A WHITE FIGURE ON A BLUE BACKGROUND. THE BLUE SHALL BE COLOR NO.15090 IN FEDERAL STANDARD 595C.
WEST STAIR
2 NO ROOF ACCESS
NOTES:
1. TACTILE FLOOR IDENTIFICATION SIGNS SHALL BE LOCATED AT THE LANDING OF EACH FLOOR LEVEL,
PLACED ADJACENT TO THE DOOR ON THE LATCH SIDE, IN ALL ENCLOSED STAIRWAYS IN BUILDINGS TWO OR MORE STORIES IN HEIGHT TO IDENTIFY THE FLOOR LEVEL.
2. AT THE EXIT DISCHARGE LEVEL, THE SIGN SHALL INCLUDE A RAISED FIVE POINTED STAR LOCATED TO THE LEFT OF THE IDENTIFYING FLOOR LEVEL. THE OUTSIDE DIAMETER OF THE STAR SHALL BE THE SAME AS
THE HEIGHT OF THE RAISED CHARACTERS
3. FOR OTHER SIGNAGE REQUIREMENTS REFERENCE 2016 CBC SEC. 11B-703 12"
M
IN.
18" MIN.
M
IN.
1 1/
2"
5"
M
IN.
NUMBER DESIGNATING THE
FLOOR LEVEL SHALL BE LOCATED
IN THE CENTER OF THE SIGN. THE
MEZZANINE LEVELS SHALL HAVE
THE LETTER "M" PRECEDING THE
FLOOR LEVEL. BASEMENT LEVELS
SHALL HAVE THE LETTER "B"
PRECEDING THE FLOOR NUMBER
LETTERS DESIGNATING THE
IDENTIFICATION OF THE STAIR
ENCLOSURE SHALL BE PLACED
AT THE TOP OF THE SIGN
1"
THE STAIRWAY'S UPPER
TERMINUS SHALL BE PLACED
UNDER THE STAIRWAY
IDENTIFICATION
FOR BRAILLE AND OTHER
IDENTIFICATION SIGNAGE
REQUIREMENTS, SEE
T-6
C1
B1 THROUGH 4 1"
LOWER AND UPPER TERMINUS OF
THE STAIRWAY
WHEN SIGNS DIRECT TO OR GIVE INFORMATION ABOUT PERM ANENT ROOMS AND FUNCTIONAL SPACES OF A BUILDING OR SITE, THEY SHALL COMPLY WITH THE FOLLOWING:
1. FINISH AND CONTRAST. CHARACTERS AND THEIR BACKGROUND SHALL HAVE A NON-GLARE FINISH.
CHARACTERS SHALL CONTRAST WITH THEIR BACKGROUND, EITHER LIGHT ON A DARK BACKGROUND OR DARK ON A LIGHT BACKGROUND.
2. PROPORTIONS.CHARACTERS SHALL BE SELECTED FROM FONTS WHERE THE WIDTH OF THE UPPERCASE LETTER O" IS 60 PERCENT MINIMUM TO 110 PERCENT MAXI MUM OF THE HEIGHT OF THE UPPERCASE LETTER "I".
3. CHARACTER HEIGHT.MINIMUM CHARACTER HEIGHT SHALL COMPLY WITH TABLE 11B-703.5.5. VIEWING
DISTANCE SHALL BE MEASURED AS THE HORIZONTAL DISTANCE BETWEEN THE CHARACTER AND AN OBSTRUCTION PREVENTING FURTHER APPROACH TOWARDS THE SIGN. CHARACTER HEIGHT SHALL BE BASED ON THE UPPERCASE LETTER "I". SEE
T-6
C4
HEIGHT TO FINISH
FLOOR OR GROUND
FROM BASELINE OF
CHARACTER
HORIZONTAL
VIEWING
DISTANCE
MINIMUM
CHARACTER
HEIGHT
40 INCHES TO
LESS THAN OR
EQUAL TO
70 INCHES
GREATER THAN
70 INCHES TO
LESS THAN OR
EQUAL TO
120 INCHES
GREATER THAN
120 INCHES
LESS THAN 72 INCHES
LESS THAN 180 INCHES
LESS THAN 21 FEET
72 INCHES
AND GREATER
180 INCHES
AND GREATER
21 FEET
AND GREATER
5/ 8 INCH
5/ 8 INCH PLUS
1/ 8 INCH PER FOOT
OF VIEWING
DISTANCE ABOVE 72
INCHES
2 INCHES
2 INCHES PLUS
1/ 8 INCH PER FOOT
OF VIEWING
DISTANCE ABOVE 180
INCHES
3 INCHES
3 INCHES PLUS
1/ 8 INCH PER FOOT
OF VIEWING
DISTANCE ABOVE 21
FEET
NOTE: THE MINIMUM HEIGHT IS
MEASURED USING AN
UPPERCASE LETTER "I". LOWER
CASE CHARACTERS ARE
PERMITTED. VIEWING DISTANCE
SHALL BE MEASURED AS THE
HORIZONTAL DISTANCE
BETWEEN THE CHARACTER AND
AN OBSTRUCTION PREVENTING
FURTHER APPROACH TOWARDS
THE SIGN.
WHEN SIGNS IDENTIFY PERMANENT ROOMS AND SPACES OF A BUILDING, THEY SHALL COMPLY WITH THE FOLLOWING:
1. FINISH AND CONTRAST. CHARACTERS AND THEIR BACKGROUND SHALL HAVE A NON-GLARE FINISH. CHARACTERS
SHALL CONTRAST WITH THEIR BACKGROUND, EITHER LIGHT ON A DARK BACKGROUND OR DARK ON A LIGHT BACKGROUND.
2. PROPORTIONS.CHARACTERS SHALL BE SELECTED FROM FONTS WHERE THE WIDTH OF THE UPPERCASE LETTER "O" IS 60 PERCENT MINIMUM AND 110 PERCENT MAXIMUM OF THE HEIGHT OF THE UPPERCASE LETTER "I".
3. RAISED CHARACTERS AND PICTOGRAM SYMBOL SIGNS. WHEN RAISED CHARACTERS ARE REQUIRED OR WHEN PICTORIAL SYMBOLS (PICTOGRAMS) ARE USED ON SUCH SIGNS, THEY SHALL CONFORM TO THE FOLLOWING:
A. CHARACTER STYLE. CHARACTERS SHALL BE SANS SERIF. CHARACTERS SHALL NOT BE ITALIC, OBLIQUE, SCRIPT, HIGHLY DECORATIVE, OR OF OTHER UNUSUAL FORMS.
B. CHARACTER HEIGHT. CHARACTER HEIGHT MEASURED VERTICALLY FROM THE BASELINE OF THE CHARACTER SHALL BE 5/ 8” MIN. AND 2” MAX. BASED ON THE HEIGHT OF THE UPPERCASE LETTER “I”.
C. PICTORIAL SYMBOLS.PICTOGRAMS SHALL HAVE A FIELD HEIGHT OF 6" MIN. CHARACTERS AND BRAILLE SHALL NOT BE LOCATED IN THE PICTOGRAM FIELD.
D. CHARACTER PLACEMENT. BRAILLE SHALL BE POSITIONED BELOW CORRESPONDING TEXT IN A HORIZONTAL FORMAT, FLUSH LEFT OR CENTERED. IF TEXT IS MULTI-LINED, BRAILLE SHALL BE PLACED BELOW ENTIRE TEXT, AND SEPARATED 3/ 8" MIN. AND 1/2" MAX. FROM ANY OTHER TACTILE CHARACTERS AND 3/ 8" MIN. FROM RAISED BORDERS AND DECORATIVE ELEMENTS.
4. BRAILLE. CONTRACTED GRADE 2 BRAILLE SHALL BE PLACED A MIN. OF 3/ 8" AND A MAX. OF 1/2" DIRECTLY BELOW THE TACTILE CHARACTERS; FLUSH LEFT OR CENTERED. WHEN TACTILE TEXT IS MULTILINED, ALL BRAILLE IS PLACED BELOW ALL LINES OF TACTILE TEXT. DOTS SHALL BE 1/10" ON CENTER IN EACH CELL WITH 3/10" SPACE BETWEEN CELLS. DOTS SHALL BE RAISED 0.025" MIN.- 0.037"MAX. ABOVE THE BACKGROUND. BRAILLE DOTS SHALL BE DOMED OR ROUNDED. THE
INDICATION OF AN UPPERCASE LETTER OR LETTERS SHALL ONLY BE USED BEFORE THE FIRST WORD OF SENTENCES, PROPER NOUNS AND NAMES, INDIVIDUAL LETTERS OF THE ALPHABET, INITIALS, AND ACRONYMS.
5. MOUNTING LOCATION AND HEIGHT. SIGNS TO BE MOUNTED ON WALL ADJACENT TO THE LATCH SIDE OF THE DOOR.
MOUNTING HEIGHT TO BE 48" MINIMUM FROM THE BASELINE OF THE LOWEST BRAILLE CELLS TO 60" MAXIMUM AFF TO THE HIGHEST LINE OF RAISED CHARACTERS. SIGNS TO BE MOUNTED SO AS TO AVOID THE SWING OF A DOOR OR PROTRUDING OBJECT. SEE
T-6
B3
WHEN SIGNS IDENTIFY, DIRECT TO, OR GIVE INFORMATION ABOUT ACCESSIBLE ELEMENTS AND FEATURES OF A
BUILDING OR SITE, THEY SHALL INCLUDE THE APPROPRIATE SYMBOL OF ACCESSIBILITY AND SHALL COMPLY WITH THE FOLLOWING:
1.FINISH AND CONTRAST. CHARACTERS AND THEIR BACKGROUND SHALL HAVE A NON-GLARE FINISH.
CHARACTERS SHALL CONTRAST WITH THEIR BACKGROUND, EITHER LIGHT ON A DARK BACKGROUND OR DARK ON A LIGHT BACKGROUND.
2.SYMBOLS OF ACCESSIBILITY. THE INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL BE THE STANDARD USED TO IDENTIFY FACILITIES THAT ARE ACCESSIBLE TO AND USABLE BY PHYSICALLY DISABLED PERSONS. (2016 CBC SEC. 11B-703.7.2.1). SEE SYMBOL ON
T-6
B2
TACTILE LETTERS
TACTILE LETTERS
BRAILLE
BRAILLE
EXIT ROUTE
BACK PAINT
1/ 4" THICK CLEAR ACRYLIC,
BACKPAINTED
3"
6"
3"
1"
TYP
6"
PT
3 PT
1 PT
3 LEFT JUSTIFY SIGN TEXT AND BRAILLE
FOR ADDITIONAL IDENTIFICATION SIGNAGE
REQUIREMENTS, REFERENCE
T-6
C1
TACTILE EXIT SIGNS SHALL BE REQUIRED AT THE FOLLOWI NG LOCATIONS:
1. EACH GRADE-LEVEL EXTERIOR EXIT DOOR SHALL BE IDENTIFIED BY A TACTILE EXIT SIGN WITH THE WORD, "EXIT".
2. EACH EXIT DOOR THAT LEADS DIRECTLY TO A GRADE-LEVEL EXTERIOR EXIT BY MEANS OF A STAIRWAY OR RAMP SHALL BE IDENTIFIED BY A TACTILE EXIT SIGN WI TH THE FOLLOWING WORDS AS APPROPRIATE:
A. "EXIT STAIR DOWN" B. "EXIT RAMP DOWN"
C. "EXIT STAIR UP" D. "EXIT RAMP UP"
3. EACH EXIT DOOR THAT LEADS DIRECTLY TO A GRADE-LEVEL EXTERIOR EXIT BY MEANS OF AN EXIT ENCLOSURE OR AN EXIT PASSAGEWAY SHALL BE IDENTIFIED BY A TACTILE EXIT SIGN WITH THE WORDS, "EXIT ROUTE".
4. EACH EXIT ACCESS DOOR FROM AND INTERIOR ROOM OR AREA TO A CORRIDOR OR HALLWAY THAT IS REQUIRED TO HAVE A VISUAL EXIT SIGN, SHALL BE IDENTIFIED BY A TACTILE EXIT SIGN WITH THE WORDS, "EXIT ROUTE".
5. EACH EXIT DOOR THROUGH A HORIZONTAL EXIT SHALL BE IDENTIFIED BY A SIGN WITH THE WORDS, "TO EXIT".
6. BRAILLE SHALL BE POSITIONED BELOW THE CORRESPONDING TEXT IN A HORIZONTAL FORMAT, FLUSH LEFT OR CENTERED. IF TEXT IS MULTI-LINED, BRAILLE SHALL BE PLACED BELOW THE ENTIRE TEXT. BRAILLE SHALL BE SEPARATED 3/ 8 INCH (9.5 MM) MINIMUM AND 1/2 INCH (12.7 MM) MAXIMUM FROM ANY OTHER TACTILE CHARACTERS AND 3/ 8 INCH (9.5 MM) MINIMUM FROM RAISED BORDERS AND DECORATIVE ELEMENTS.
EXIT1" TYP.
100
NOTES:
1. REFER TO DOOR SCHEDULE FOR SIGN LOCATION AND VERBIAGE. VERIFY ALL TEXT WITH ARCHITECT PRIOR TO FABRICATION.
2. REFER TO SIGNAGE DETAIL ON ARCHITECTURAL SHEETS FOR SPECIFIC SIGN DESIGN, COLORS AND FINISHES.
AS
REQ
UIRED
HEIG
HT
LENGTH AS REQUIRED
CORRESPONDING
GRADE II BRAILLE
LETTERS AND NUMERALS SHALL
BE RAISED 1/32" MINIMUM,
UPPER CASE, SAN SERIF TYPE
AND SHALL BE ACCOMPANIED
WITH GRADE II BRAILLE.
RAISED CHARACTERS SHALL BE
AT LEAST 5/ 8" HIGH, BUT NO
HIGHER THAN 2"
FOR OTHER IDENTIFICATION SIGNAGE REQUIREMENTS, SEE
T-6
C1
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
SIGNAGE
ACCESSIBILITY
DETAILS
200102
T-6
BC
JK
MM
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1 1/ 2" = 1'-0"T-6
A1 RESTROOM SIGNAGE
SCALE:1 1/2" = 1'-0"T-6
A3 DOOR MOUNTED TOILET ROOM SIGNAGE
SCALE:1/4" = 1'-0"T-6
B3 SIGNAGE DETAIL
SCALE:NTST-6
B2 INTERNATIONAL SYMBOL OF ACCESSIBILTY SIGNAGE
SCALE:1 1/ 2" = 1'-0"T-6
B1 FLOOR IDENTIFICATION SIGNAGE
SCALE:NTST-6
C2 DIRECTIONAL AND INFORMATIONAL SIGNS
SCALE:NTST-6
C4 VISUAL CHARACTER HEIGHT TABLE
SCALE:NTST-6
C1 IDENTIFICATION SIGNS
SCALE:NTST-6
C3 ACCESSIBILITY SIGNS
SCALE:3" = 1'-0"T-6
D3 TACTILE EXIT SIGNS
SCALE:1 1/ 2" = 1'-0"T-6
D4 ROOM IDENTIFICATION SIGNAGE
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 197 of 357
1 10
10% MAX.
48"
MIN.
2%
MAX.8.33%
MAX.
48" MIN.
NOTE: SLOPE OF LANDING AREA DOES NOT
EXCEED 2% IN ANY DIRECTION
WALL
OR OTHER
OBSTRUCTION
NOTES:
1. THE CROSS SLOPE OF CURB RAMPS AND BLENDED TRANSITIONS SHALL BE 1:48 MAXIMUM.
2. FINISHED SURFACE OF RAMP IS STABLE, FIRM, AND SLIP RESISTANT.
3. TRANSITIONS FROM RAMPS TO WALKS, GUTTERS OR STREETS SHALL BE FLUSH AND FREE OF ABRUPT CHANGES.
COUNTER SLOPES SHALL NOT BE STEEPER THAN 1:20 WITHIN 24" OF CURB RAMP.
4. DETECTABLE WARNING SURFACE IS REQUIRED ON SHADED PORTION OF THE RAMP. DETECTABLE WARNINGS SHALL EXTEND 36" IN THE DIRECTION OF TRAVEL AND SHALL EXTEND THE FULL WIDTH OF THE RAMP RUN (EXCLUDING
FLARED SIDES) SEE
NOTE: COUNTER SLOPES
OF ADJOINING GUTTERS
ROAD SURFACES
ADJACENT TO AND
WITHIN 24" OF A CURB
RAMP SHALL NOT BE
STEEPER THAN 1:20
T-7
B1
8"
MAX
6"
MIN
48" MIN.
WALL
OR
OTHEROBSTRUCTION
48" MIN.
8.33% MAX
8. 33%
MAX
NOTE: SLOPE OF
LANDING AREAS DO NOT
EXCEED 2% IN ANY
DIRECTION
NOTE: SURFACE WILL REQUIRE 36" SECTION OF
TRUNCATED DOMES IF FLAT TRAVEL SURFACE
ADJOINS VEHICULAR TRAFFIC WAY, SEE
60"
MIN.
RECOMMENDED48"
MIN.
REQ'
D
NOTES:
1. THE CROSS SLOPE OF CURB RAMPS AND BLENDED TRANSITIONS SHALL BE 1:48 MAXIMUM.
2. FINISHED SURFACE OF RAMP IS STABLE, FIRM, AND SLIP RESISTANT.
3. TRANSITIONS FROM RAMPS TO WALKS, GUTTERS OR STREETS SHALL BE FLUSH AND FREE OF ABRUPT CHANGES.
COUNTER SLOPES SHALL NOT BE STEEPER THAN 1:20 WITHIN 24" OF CURB RAMP.
NOTE: COUNTER SLOPES OF
ADJOINING GUTTERS &
ROAD SURFACES ADJACENT
TO AND WITHIN 24" OF
CURB RAMP SHALL NOT BE
STEEPER THAN 1:20
T-7
B1
36"
36"
WHITE SYMBOL
OF
ACCESSIBILITY
BLUE BACKGROUND
THE CENTERLINE OF
INTERNATIONAL
SYMBOL OF
ACCESSIBILITY (ISA)
SHALL BE A MAX. OF 6"
FROM THE CENTERLINE
OF THE PARKING
SPACE, IT'S SIDES
PARALLEL TO THE
LENGTH OF THE
PARKING SPACE & THE
LOWERSIDE SHALL BE
ALIGNED WITH THE END
OF THE PARKING
SPACE LENGTH.
1 2
3 4
1 2
3 5
4 18
80 M
IN
AF
G
VAN
ACCESSIBLE
80 M
IN
AF
G
BLUEBACKGROUND1
2 3
4 REFLECTORIZED SIGN
CONSTRUCTED OR
PORCELAIN STEEL
WHITE SYMBOL
2" DIAMETER
GALVANIZED PIPE
BLUEBACKGROUND1
2 3
4 REFLECTORIZED SIGN
CONSTRUCTED OR
PORCELAIN STEEL
WHITE SYMBOL
2" DIAMETER
GALVANIZED PIPE
5 INDICATES STALL IS
VAN ACCESSIBLE
MINIMUM
FINE $250
MINIMUM
FINE $250
12"
18"18"
12"
1 2
4 80 M
IN
AF
G
BLUEBACKGROUND1
2 3
4 REFLECTORIZED SIGN
CONSTRUCTED OR
PORCELAIN STEEL
WHITE LETTERING AND
SYMBOL
2" DIAMETER
GALVANIZED PIPE
17"
22"
UNAUTHORIZED VEHICLES
PARKED IN DESIGNATED
ACCESSIBLE SPACES NOT
DISPLAYING
DISTINGUISHING
PLACARDS OR SPECIAL
LICENSE PLATES ISSUED FOR
PERSONS WITH DISABILITIES
WILL BE TOWED AWAY AT
THE OWNER'S EXPENSE.
TOWED VEHICLES MAY BE
RECLAIMED AT
OR BY TELEPHONING
3 5 TOW AWAY
INFORMATION TO BE
FILLED IN PERMANENTLY
AS PART OF SIGN PRIOR
TO INSTALLATION
AN ADDITIONAL SIGN SHALL BE POSTED IN A CONSPICUOUS PLACE AT EACH ENTRANCE
TO OFF-STREET PARKING FACILITIES OR IMMEDIATELY ADJACENT TO AND VISIBLE FROM EACH ACCESSIBLE STALL OR SPACE. THE SIGN SHALL NOT BE LESS THAN 17 INCHES BY 22
INCHES IN SIZE WITH LETTERING NOT LESS THAN ONE INCH IN HEIGHT, AND SHALL CLEARLY AND CONSPICUOUSLY STATE THE FOLLOWING:
UNAUTHORIZED VEHICLES PARKED IN DESIGNATED ACCESSIBLE SPACES NOT DISPLAYING
DISTINGUISHING PLACARDS OR SPECIAL LICENSE PLATES ISSUED FOR PERSONS WITH DISABILITIES WILL BE TOWED AWAY AT THE OWNER'S EXPENSE. TOWED VEHICLES MAY BE RECLAIMED AT _______OR BY TELEPHONING _____ ."
BLANK SPACES ARE TO BE FILLED IN WITH APPROPRIATE INFORMATION AS A PERMANENT PART OF THE SIGN. SEE
TYPICAL ACCESSIBLE PARKING SIGNAGE
SIGN SHALL NOT BE SMALLER THAN 70 SQUARE INCHES IN AREA, AND SHALL BE MOUNTED ON A POST SET IN CONCRETE, 80 INCHES FROM THE BOTTOM OF THE SIGN TO FINISHED GRADE. SIGN SHALL BE REFLECTORIZED WITH A PROFILE VIEW OF A WHEELCHAIR WITH OCCUPANT IN WHITE ON A DARK BLUE BACKGROUND. ADDITI ONAL LANGUAGE OR AN
ADDITIONAL SIGN BELOW THE INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL STATE Minimum Fine $250" SEE
TYPICAL VAN ACCESSIBLE PARKING SIGNAGE
SIGN SHALL BE SAME AS ABOVE, WITH ADDITIONAL SIGN "VAN ACCESSIBLE" MOUNTED BELOW THE SYMBOL OF ACCESSIBILITY. SEE
PARKING LOT ACCESSIBILITY SIGNAGE
T-7
D3
T-7
D3
T-7
D3
NOTE: A PARKING SPACE IDENTIFICATION SIGN SHALL BE VISIBLE FROM EACH PARKING SPACE. SIGNS
SHALL BE PERMANENTLY POSTED EITHER IMMEDIATELY ADJACENT TO THE PARKING SPACE OR WITHIN THE PROJECTED PARKING SPACE WIDTH AT THE HEAD END OF THE PARKING SPACE. SIGNS MAY ALSO BE PERMANENTLY POSTED ON A WALL AT THE INTERIOR END OF THE PARKING SPACE.
MINIMUM
FINE $250
VAN
ACCESSIBLE
UNAUTHORIZED VEHICLES
PARKED IN DESIGNATED
ACCESSIBLE SPACES NOT
DISPLAYING DISTINGUISHING
PLACARDS OR SPECIAL
LICENSE PLATES ISSUED FOR
PERSONS WITH DISABILITIES
WILL BE TOWED AWAY AT
THE OWNER'S EXPENSE.
TOWED VEHICLES MAY BE
RECLAIMED AT
OR BY TELEPHONING
MINIMUM
FINE $250
ISA PARKING STALL
EMBLEM, SEE
18'-
0"
M
IN.
3'-0"
3'-
0"
9'-0"
5'-0" REGULAR)
8'-0" VAN
CONCRETE CURB
PAINT BLUE
CONCRETE
WHEEL STOP,
SEE
ACCESSIBLE
PARKING SIGN,
SEE
T-7
D2
M
IN.
4'-
0".
DETECTABLE
WARNING, REFER TO
NOTE: ACCESS AISLE TO BE LOCATED
ON THE PASSENGER SIDE
4" WIDE STRIPES @ 36"
O.C. TYP. (BLUE)
4" PARKING STALL STRIPING
TYP. (FEDERAL BLUE)
NO
PARKING
12" HIGH LETTERS (WITHIN
ACCESS AISLE). COLOR = WHITE
1. 5
M
A
X
1.5%
MAX
FOR CURB RAMP
REQUIREMENTS, REFER TO
T-7
A4
T-7
B1
DIMENSION TO CENTERLINE OF STRIPE, TYP.
T-7
C3
T-7
D3
NOTE: THAT RAMPS ARE NOT ALLOWED TO ENCROACH INTO LOADING/ UNLOADING ZONES, PARKING SPACES OR VEHICULAR TRAFFI C LANES. CURB RAMPS ARE REQUIRED WHEN WALK IS AT A DIFFERENT LEVEL THAN PARKING ELEVATION.
1. 5
M
A
X
1.5%
MAX
T-7
B3
36"
O.
C
NOTE 1: DETECTABLE WARNINGS SHALL CONSIST OF RAISED TRUNCATED DOMES WITH A BASE DIAMETER OF 0.9" MIN-0.92" MAX, TAPERING TO 0.45" MIN-0.47" MAX AT THE TOP, A HEIGHT OF 0.2" AND A CENTER TO CENTER SPACING OF 2.3" MIN-2.4" MAX AND A BASE TO BASE SPACING OF 0.65" MIN MEASURED BETWEEN THE MOST ADJACENT DOMES ON A SQUARE GRID.
CENTER TO CENTER SPACING OF 1.6" MIN AND 2.4" MAX ACCEPTABLE FOR DOMES IN RADIAL PATTERN.
NOTE 2: THE DETECTABLE WARNINGS SHALL CONTRAST VISUALLY WITH ADJOINING SURFACES, WHETHER LIGHT ON DARK OR DARK ON LIGHT AND 70% MINIMUM WITH ADJACENT WALKING SURFACES. THE MATERIAL USED TO PROVIDE CONTRAST SHALL BE AN INTEGRAL PART OF THE WALKING SURFACE. CONTRAST SHALL BE DETERMINED BY: CONTRAST=[(B1- B2)/B1] X 100 PERCENT WHERE B1= LIGHT REFLECTANCE VALUE OF THE LIGHTER AREA, AND B2 = LIGHT REFLECTANCE VALUE OF THE DARKER AREA.
65"
MIN
APART
2. 3" -
2. 4"
APART
2.3" - 2.4"
AT BASE
0.9"-0.92"
AT TOP
45"-.47"
AA
TYPICAL PLAN
TYPICAL PLAN SECTION A-A
0.2" HT.
TAPERED EDGES
WHERE EXPOSED
NOTE 3: IF A WALK CROSSES OR ADJOINS A VEHICULAR WAY, AND THE
WALKING SURFACES ARE NOT SEPARATED BY CURBS, RAILINGS OR
OTHER ELEMENTS BETWEEN THE PEDESTRIAN AREAS AND THE VEHICULAR
AREAS, THE BOUNDARY BETWEEN THE AREAS SHALL BE DEFI NED BY A CONTINUOUS DETECTABLE WARNING WHICH IS 36" WIDE.
NOTE 4: DETECTABLE WARNING SURFACES SHALL BE YELLOW
CONFORMING TO FS33538 OF FEDERAL STANDARD 595C.
NOTE 5: DETECTABLE WARNINGS AT CURB RAMPS SHALL EXTEND 36 INCHES (914 MM) IN THE DIRECTION OF TRAVEL. DETECTABLE
WARNINGS SHALL EXTEND THE FULL WIDTH OF THE RAMP RUN LESS 2 INCHES (51 MM) MAXIMUM ON EACH SIDE, EXCLUDING ANY FLARED SIDES. DETECTABLE WARNINGS SHALL BE LOCATED SO THE EDGE NEAREST THE CURB IS 6 INCHES (152 MM) MINIMUM AND 8 INCHES 203 MM) MAXIMUM FROM THE LINE AT THE FACE OF THE CURB
MARKING THE TRANSITION BETWEEN THE CURB AND THE GUTTER, STREET OR HIGHWAY.
ACCESSIBLE ROUTE
FEDERAL BLUE
FEDERAL WHITE
SIGN TO BE REFLECTIVE
CONFIRM DIRECTION
WITH ARCHITECT
6"
REFERENCE FOR ADDITIONAL IDENTIFICATI ON SIGNAGE REQUIREMENTS.
T-6
C3
ISA PARKING STALL EMBLEM,
SEE
18'-
0"
M
IN.
9'-0"
5'-0" REGULAR)
8'-0" VAN 9'-0"
CONCRETE WHEEL STOP, SEE
ACCESSIBLE PARKING
SIGN AT EACH ACCESSIBLE
SPACE, SEE
T-7
D2
4" WIDE STRIPES @ 36"
O.C. TYP. (BLUE)
4" PARKING STALL STRIPING
TYP. (FEDERAL BLUE)
NO
PARKING
12" HIGH LETTERS (WITHIN
ACCESS AISLE). COLOR = WHITE
1. 5
M
A
X
1.5%
MAX
DIMENSION TO CENTERLINE
OF STRIPE, TYP.
T-7
C3
T-7
D3
3'-0"
3'-
0"
ACCESSIBLE AISLE
ACCESSIBLE ROUTE, MAX SLOPE 1:20, MAX CROSS SLOPE 1:48
4'-
0"
M
IN.
1. 5
M
A
X
1.5%
MAX
T-7
B3
36"
O.
C
7 1/ 2"
5"
2"
4'-0"
7 1/
2"
2"
PRECAST CONCRETE BUMPER
5/8" DIAM. x 24" DOWELS
NOTES:
1. WHERE NEW ELECTRICAL VEHICLE CHARGING STATIONS (EVCS) ARE ADDED TO A FACILITY WITH EXISTING, REQUIREMENTS SHALL APPLY ONLY TO EXISTING.
2. DETECTABLE WARNINGS SHALL NOT BE PERMITTED IN VEHICLE SPACES AND ACCESS AISLES
3. WHERE A VEHICLE SPACE SERVING EVCS STATION IS PARALLEL TO THE TRAFFIC FLOW THE LENGTH OF THE VEHICLE SPACE SHALL BE 20'-0" MINIMUM
4. VEHICLE SPACES SERVING STANDARD AND VAN EVCS SHALL HAVE AN ADJACENT ACCESS AISLE.
5. VEHICLE SPACES SERVING AMBULATORY EVCS SHALL BE 120" WIDE MINIMUM AND SHALL NOT BE REQUIRED TO
HAVE AN ADJACENT ACCESS AISLE
6. WHERE 5-25 EVCS ARE PROVIDED, ONE VAN ACCESSIBLE EVCS SHALL BE PROVIDED AND IDENTIFIED BY AN ISA
7. EV CHARGERS SHALL BE ADJACENT TO, AND WITHIN THE PROJECTED WIDTH OF, THE VEHICLE SPACE BEING SERVED. EXCEPTION: WHERE EV CHARGERS ARE SERVING MORE THAN ONE EVCS, THE EV SHALL BE ADJACENT TO, AND WITHIN THE COMBINED PROJECTED WIDTH OF, THE VEHICLE SPACES BEING SERVED. FOR ALTERATIONS
AT AN EXISTING FACILITY WHERE AN ACCESSIBLE ROUTE OR GENERAL CIRCULATION PATH IS NOT PROVIDED
ADJACENT TO THE HEAD END OF THE VEHICLE SPACE OR ACCESS AISLE, THE EV CHARGER MAY BE LOCATED WITHIN THE PROJECTED WIDTH OF THE ACCESS AISLE 36" MAXIMUM FROM THE HEAD END OF THE SPACE. WHERE VEHICLE SPACE IS PARALLEL TO TRAFFIC FLOW, THE EV CHARGER SHALL BE ADJACENT TO, AND 48" MAXIMUM
FROM THE HEAD END OR FOOT END OF THE VEHICLE SPACE OR ACCESS AISLE BEING SERVED
8.VEHICLE SPACES AND ACCESS AISLES SHALL BE DESIGNED SO THAT PERSONS USING THEM ARE NOT REQUIRED
TO TRAVEL BEHIND VEHICLE SPACES OR PARKING SPACES OTHER THAN THE VEHICLE SPACE IN WHICH THEIR VEHICLE HAS BEEN LEFT TO CHARGE.
ACCESSIBILITY
12'-0" VAN
ACCESS AISLE
60" MIN
ACCESSIBILITY
9'-0" STANDARD
ACCESSIBLE AISLE: 4" WIDE
STRIPES @ 36" O.C. TYP. COLOR
TO CONTRAST SURFACE
4" PARKING STALL STRIPING TYP.
1. 5
M
A
X
1.5%
MAX
DIMENSION TO
CENTERLINE OF
STRIPE, TYP.
ACCESSIBLE ROUTE, MAX
SLOPE 1:20, MAX CROSS
SLOPE 1:4860"
M
IN.
1. 5
M
A
X
1.5%
MAX
36"
O.
C
1. 5
M
A
X
1.5%
MAX
NO
PARKING
12" HIGH LETTERS
WITHIN ACCESS
AISLE). COLOR =
WHITE
EV
CHARGING
ONLY
EV
CHARGING
ONLY
18'-
0"
M
IN.
EV CHARGER TO BE
ADJACENT TO AND WITHIN
THE PROJECT WIDTH OF THE
ACCESSIBLE SPACE
THE CENTERLINE OF THE TEXT
SHALL BE A MAXIMUM OF 6
INCHES FROM THE CENTERLINE
OF THE VEHICLE SPACE AND
ITS LOWER CORNER AT, OR
LOWER SIDE ALIGNED WITH,
THE END OF THE PARKING
SPACE LENGTH.
CONCRETE WHEEL
STOP, SEE
T-7
B3
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
SITE
ACCESSIBILITY
DETAILS
200102
T-7
BC
JK
MM
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:N.T.S.T-7
A4 STANDARD CURB-CUT RAMP
SCALE:N.T.S.T-7
A3 STANDARD IN-LINE CURB RAMP
SCALE:1 1/2" = 1'-0"T-7
C3 INTERNATIONAL SYMBOL OF ACCESSIBILTY PARKING STALL EMBLEM SCALE:1" = 1'-0"T-7
D3 ACCESSIBLE PARKING SIGN
SCALE:3" = 1'-0"T-7
D2 PARKING SIGNAGE
SCALE:1/ 8" = 1'-0"T-7
D1 ACCESSIBLE PARKING SPACE - SINGLE
SCALE:NONET-7
B1 DETECTABLE WARNING DETAIL
SCALE:3" = 1'-0"T-7
D4 ACCESSIBLE ROUTE SIGN
SCALE:1/ 8" = 1'-0"T-7
C1 ACCESSIBLE PARKING SPACE - DOUBLE
SCALE:1" = 1'-0"T-7
B3 WHEEL STOP
SCALE:1/ 8" = 1'-0"T-7
B2 ELECTRICAL VECHILE CHARGING STATIONS
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 198 of 357
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
CALGREEN
COMPLIANCE
200102
T-8
BC
JK
MM
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
CalGreen Mandatory Measures Compliance Checklist
Number Description Compliance Reference
5.503 Fireplaces No
5.503.1 Fireplaces No
5.503.1 Fireplaces No
5.503.1.1 Woodstoves No
5.504 Pollutant control Yes M0.1, 01352
5.504.1 Pollutant control Yes M0.1, 01352
5.504.3 Covering of duct openings and protection of
mechanical equipment during construction
Yes M0.1, 01352
5.504.4 Finish material pollutant control Yes SPECS
5.504.4.1 Adhesives, sealants and caulks Yes SPECS
5.504.4.3 Paints and coatings Yes 09900
5.504.4.3.1 Aerosol paints and coatings Yes 09900
5.504.4.3.2 Verification Yes 09900
5.504.4.4 Carpet systems No
5.504.4.4.1 Carpet cushion No
5.504.4.4.2 Carpet adhesive No
5.504.4.5 Composite wood products Yes SPECS
5.504.4.5.3 Documentation Yes SPECS
5.504.4.6 Resiliant floor systems Yes 09650
5.504.4.6.1 Verification of compliance Yes 09650
5.504.5.3 Filters Yes M0.1
5.504.7 Environmental tobacco smoke (ETS) control No
5.505 Indoor moisture control Yes A4.3 - A4.9
5.505 Indoor air quality Yes M0.1
5.505.1 Indoor moisture control Yes A4.3 - A4.9
5.506.2 Outside air delivery Yes M0.1
5.507 Environmental comfort Yes A4.3 - A4.9
5.507.4 Acoustical control Yes A4.3 - A4.9
5.507.4.1 Exterior noise transmission, prescriptive method No
5.507.4.1.1 Noise exposure where noise contours are not readily available
No
5.507.4.2 Performance method No
5.507.4.2.1 Site features No
5.507.4.2.2 Documentation of compliance No
5.507.4.3 Interior sound transmission Yes A4.7 - A4.9
5.508 Outdoor air quality Yes M0.1
5.508.1 Ozone depletion and greenhouse gas reductions Yes M0.1
5.508.1.1 Chlorofluorocarbons (CFCs) Yes M0.1
5.508.1.2 Halons Yes M0.1
5.508.2 Supermarket refrigerant leak reduction No
5.508.2.1 Refrigerant piping Yes M0.1, 15800
5.508.2.1.1 Threaded pipe Yes M0.1, 15800
5.508.2.1.2 Copper pipe Yes M0.1, 15800
5.508.2.1.2.1 Anchorage Yes M0.1, 15800
5.508.2.1.3 Flared tubing connections Yes M0.1, 15800
5.508.2.1.4 Elbows Yes M0.1, 15800
5.508.2.2 Valves Yes M0.1, 15800
5.508.2.2.1 Pressure relief valves Yes M0.1, 15800
5.508.2.2.1.1 Pressure detection Yes M0.1, 15800
5.508.2.2.2 Access valves Yes M0.1, 15800
5.508.2.2.2.1 Valve caps Yes M0.1, 15800
5.508.2.2.2.2 Seal caps Yes M0.1, 15800
5.508.2.2.2.2.1 Chain tethers No
5.508.2.3 Refrigerated service cases No
5.508.2.3.1 Coil coating No
5.508.2.4 Refrigerant receivers No
5.508.2.5 Pressure testing Yes M0.1, 15800
5.508.2.5.1 Minimum pressure Yes M0.1, 15800
5.508.2.5.2 Leaks Yes M0.1, 15800
5.508.2.5.3 Allowable pressure change Yes M0.1, 15800
5.508.2.6 Evacuation Yes M0.1, 15800
5.508.2.6.1 First vacuum Yes M0.1, 15800
5.508.2.6.2 Second vacuum Yes M0.1, 15800
5.508.2.6.3 Third vacuum Yes M0.1, 15800
7 Installer and Special Inspector Qualifications
702 Qualifications Yes M0.1, 15800
702.1 Installer Training Yes M0.1, 15800
702.2 Special inspection [HCD] Yes M0.1, 15800
703 Verifications Yes M0.1, 15800
703.1 Documentation Yes M0.1, 15800
CalGreen Mandatory Measures Compliance Checklist
Number Description Compliance Reference
5.303.4.1 Food waste disposers Yes P0.2
5.303.5 Areas of addition or alteration No
5.303.6 Standards for plumbing fixtures and fittings Yes P0.1 / P0.2
5.304 Outdoor water use Yes PRESCRIPTIVE COMPLIANCE
APPLICATION
5.304.1 Scope Yes PRESCRIPTIVE COMPLIANCE
APPLICATION
5.304.2 Outdoor water use in landscape area equal to or greater than 500 square feet
Yes PRESCRIPTIVE COMPLIANCE
APPLICATION
5.304.3 Outdoor wateruse in rehabilitated landscape
projects equal to or greater than 2,500 square feet
No
5.304.4 Outdoor water use in landscape are of 2,500
square feet or less
Yes PRESCRIPTIVE COMPLIANCE
APPLICATION
5.304.5 Graywater or rainwater use in landscape areas No
5.304.6 Outdoor portable water use in landscape areas
DSA-SS]
No
5.304.6.1 Newly constructed landscape. [DSA-SS] No
5.304.6.2 Rehabilitated landscape. [DSA-SS] No
5.304.7 Irrigation Design Yes LI-1 - LI-4
5.304.7.1 Irrigation controllers Yes LI-1 - LI-4
5.4 Material Conservation and Resource Efficiency
5.401 General Yes A3.1 - A3.3
5.401.1 Scope No
5.402 Definitions No
5.402.1 Definitions No
5.407 Water Resistance and moisture management Yes A4.3 - A4.9
5.407.1 Weather protection Yes A4.3 - A4.9
5.407.2 Moisture control Yes A4.3 - A4.9
5.407.2.1 Sprinklers Yes LI-2
5.407.2.2 Interior door protection Yes A2.4
5.407.2.2.1 Exterior door protection Yes A2.4
5.407.2.2.2 Flashing Yes A7.1 - A7.3
5.408 Construction waste reduction, disposal and
recycling
Yes A1.1, 01351
5.408.1 Construction waste management Yes WMP
5.408.1.1 Construction waste management plan Yes WMP
5.408.1.2 Waste management company No
5.408.1.3 Waste stream reduction alternate No
5.408.1.4 Documentation Yes 01351
5.408.2 Universal waste No
5.408.3 Excavated soil and land clearing debris Yes 02200
5.408.3 Excavated soil and land clearing debris Yes 02200
5.410 Building maintenance and operations Yes A0.1/A1.1
5.410.1 Recycling by occupants Yes A1.2
5.410.1.1 Additions No
5.410.1.2 Sample ordinance No
5.410.2 Commissioning [N]No
5.410.2.1 Owner's or owner representive's project
requirements (OPR). [N]
Yes 15800
5.410.2.2 Basis of design (BOD). [N] Yes 15800
5.410.2.3 Commissioning plan. [N] Yes 15800
5.410.2.4 Functional performance testing. [N] Yes 15800
5.410.2.5 Documentation and training. [N] Yes 15800
5.410.2.5.1 Systems manual. [N] Yes 15800
5.410.2.5.2 Systems operations training. [N] Yes 15800
5.410.2.6 Commissioning report. [N] Yes 15800
5.410.4 Testing and adjusting Yes 15800
5.410.4.2 Systems Yes 15800
5.410.4.3 Procedures Yes 15800
5.410.4.3.1 HVAC balancing Yes 15800
5.410.4.4 Reporting Yes 15800
5.410.4.5 Operation and maintenance (O & M) manual Yes 15800
5.410.4.5.1 Inspections and reports Yes 15800
5.5 Environmental Quality
5.501 General No
5.501.1 Scope No
5.502 Definitions No
5.502.1 Definitions No
CalGreen Mandatory Measures Compliance Checklist
Number Description Compliance Reference
3 Green Building
301 General Yes T-1
301.1 Scope Yes T-1
301.3 Nonresidential additions and alterations. [BSC] No 301.3.1 Nonresidential additions and alterations that
cause updates to plumbing fixtures only
No
301.3.2 Waste Division Yes
301.4 Public schools and community colleges No
301.5 Health facilities No
302 Mixed Occupancy Buildings No
302.1 Mixed Occupancy Buildings No
303 Phased projects No
303.1 Phased projects No
303.1.1 Tenant improvements No
5.1 Planning and Design
5.101 General Yes T-1
5.101.1 Scope Yes T-1
5.102 Definitions No
5.102.1 Definitions No
5.106 Site development Yes CIVIL DRAWINGS
5.106.1 Storm water pollution prevention Yes SWPPP/CIVIL DRAWINGS
5.106.1.1 Local ordinance Yes SWPPP
5.106.1.2 Best management practices (BMP) Yes C8.0 / C8.1
5.106.4 Bicycle parking No
5.106.4.1 Bicycle parking. [BSC-CG] No
5.106.4.1.1 Short-term bicycle parking No
5.106.4.1.2 Long-term bicycle parking No
5.106.4.2 Bicycle parking. [DSA-SS] No
5.106.4.2.1 Student bicycle parking No
5.106.4.2.2 Staff bicycle parking No
5.106.5.2 Designated parking for clean air vehicles Yes A1.2
5.106.5.2.1 Parking stall marking (Clean Air Vehicle) Yes A1.2
5.106.5.3 Electric vehicle (EV) charging [N] Yes A1.2
5.106.5.3.1 Single charging space requirements [N] Yes ELECTRICAL DRAWINGS
5.106.5.3.2 Multiple charging space requirements [N] No
5.106.5.3.3 EV charging space calculations [N] No
5.106.5.3.4 Identification [N]Yes A1.2
5.106.5.3.5 [N]No
5.106.8 Light Pollution Reduction Yes E5.1 - E5.3
5.106.10 Grading and paving Yes C6.0
5.2 Energy Efficiency
5.201 General Yes E5.1 - E5.3
5.201.1 Scope [BSC-CG]. California Energy Code [DSA-SS] Yes E5.1 - E5.3
5.3 Water Efficiency + Conservation
5.301 General Yes P0.1
5.301.1 Scope Yes P0.1
5.302 Definitions No
5.302.1 Definitions No
5.303 Indoor water use Yes P0.1
5.303.1 Meters Yes P0.1
5.303.1.1 Building in excess of 50,000 square feet No
5.303.1.2 Excess consumption No
5.303.3 Water conserving plumbing fixtures and fittings Yes P0.1
5.303.3.1 Water closets Yes P0.1
5.303.3.2 Urinals No
5.303.3.3 Showerheads Yes P0.1
5.303.3.3.1 Single showerheads Yes P0.1
5.303.3.3.2 Multiple showerheads serving one shower No
5.303.3.4 Faucets and fountains Yes P0.1
5.303.3.4.1 Nonresidential lavetory faucets Yes P0.1
5.303.3.4.2 Kitchen faucets Yes P0.1
5.303.3.4.3 Wash fountains No
5.303.3.4.4 Metering faucets No
5.303.3.4.5 Metering faucets for wash fountains No
5.303.4 Commercial kitchen equipment Yes P0.1
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 199 of 357
400 CY
180 CY
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 200 of 357
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 201 of 357
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 202 of 357
STANDARD DETAIL
STORMWATER BIOFILTRATION SYSTEM
MWS-L-4-8-6'-2"-V
GENERAL NOTES
INSTALLATION NOTES
SITE SPECIFIC DATA
PLAN VIEW
ELEVATION VIEW RIGHT END VIEW
LEFT END VIEW
0.71"
PRELIMINARY SIZING TO BE
FINALIZED IN SHOP DRAWINGS
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 203 of 357
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 204 of 357
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 205 of 357
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 206 of 357
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 207 of 357
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 208 of 357
ALTERNATE BID ITEM #1:
PARKING LOT STRIPING AND
PARKING LOT SIGNAGE PER
ARCHITECTURAL PLANS
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 209 of 357
ALTERNATE BID ITEM #1:
PARKING LOT STRIPING AND
PARKING LOT SIGNAGE PER
ARCHITECTURAL PLANS
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 210 of 357
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 211 of 357
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 212 of 357
02/ 11/21
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 213 of 357
02/ 11/21
ALTERNATE BID ITEM #1:
PARKING LOT STRIPING AND
PARKING LOT SIGNAGE PER
ARCHITECTURAL PLANS
11/25/20
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 214 of 357
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
ISSUED FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619.992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR
ASR
1. 2.
3. 4.
5. 1.
2. 3.
4. 5.
6. 7.
8. 9.
10. 11.
12. 13.
DECLARATION OF RESPONSIBLE CHARGE
GENERAL NOTES
A CONSTRUCTION PERMIT IS REQUIRED FOR ALL CONTRACTORS PERFORMING ANY OF THE WORK SHOWN ON THESE PLANS. THE PERMIT CAN BE OBTAINED AT THE CITY OF VISTA DEVELOPMENT SERVICES COUNTER, 200 CIVIC CENTER DRIVE, VISTA, CA. A PERMIT WILL BE ISSUED ONLY TO THE CONTRACTOR WHO IS TO PERFORM THE WORK. THE PERMITEE
SHALL GIVE NOTICE TO THE CITY OF VISTA ENGINEERING INSPECTION DEPARTMENT FOR A PRECONSTRUCTION CONFERENCE AT LEAST 48 HOURS PRIOR TO COMMENCING THE WORK.
ANY WORK DONE WITHOUT PROPER INSPECTION WILL BE SUBJECT TO REJECTION. PHONE:
760)639-6113 FOR INSPECTION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL UTILITIES. FOR LOCATION OF UNDERGROUND UTILITIES, OR FOR EMERGENCY ASSISTANCE CALL:
UNDERGROUND SERVICE ALERT (800) 422-4133 UNDERGROUND SERVICE ALERT (SDG&E) (800) 227-2600 SAN DIEGO GAS & ELECTRIC (EMERGENCY) (800) 411-7343 PACIFIC BELL TELEPHONE CO. (EMERGENCY) (DIAL) 611 VISTA IRRIGATION DISTRICT (ENG. DEPT) (760) 597-3116 VISTA IRRIGATION DISTRICT (EMERGENCY) (760) 597-3131 COX CABLE (EMERGENCY) (760) 599-6063 ADELPHIA COMMUNICATIONS (EMERGENCY) (760) 438-7741 CITY OF VISTA (MAIN NUMBER) (760) 726-1340 CITY OF VISTA (ENG. DEPT. DIRECT LINE) (760) 639-6111
CITY OF VISTA AFTER HOURS EMERGENCY DISPATCH FOR SEWER
SPILLS OR STORM DRAIN CONTAMINATION CALL RHO. FIRE DISPATCH EMERGENCY) (858) 756-3006
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, AND THE SAN DIEGO SPECIAL
SUPPLEMENT TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, AS LAST AMENDED.
AS-BUILT" DRAWING(S) SHALL BE SUBMITTED BY THE ENGINEER OF WORK AND APPROVED BY THE CITY ENGINEER PRIOR TO THE ACCEPTANCE OF THE IMPROVEMENTS.
PRIOR TO CONSTRUCTION OF STREET LIGHTS, A PLAN [ON 24"x36" SHEET(S)] APPROVED
BY SAN DIEGO GAS & ELECTRIC SHOWING EXACT PLACEMENT OF ALL STREET LIGHTS,
PULL BOXES, SIZE AND LOCATION OF CONDUITS AND SOURCES OF POWER SHALL BE SUBMITTED TO THE CITY ENGINEER.
SPECIAL NOTES
THE FOLLOWING NOTES ARE PROVIDED TO GIVE INSTRUCTIONS TO THE CONTRACTOR BY THE ENGINEER OF WORK. THE CITY ENGINEER'S SIGNATURE ON THESE PLANS DOES NOT
CONSTITUTE APPROVAL OF ANY OF THESE NOTES, AND THE CITY WILL NOT BE RESPONSIBLE FOR THEIR ENFORCEMENT.
NEITHER THE OWNER NOR THE ENGINEER OF WORK WILL ENFORCE SAFETY MEASURES OR REGULATIONS. THE CONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL SAFETY
DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO
ALL LOCAL, STATE, AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS, AND REGULATIONS.
CONTRACTOR SHALL MAKE EXPLORATION EXCAVATIONS AND LOCATE EXISTING
UNDERGROUND FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS
TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION OF EXISTING FACILITIES. NOTIFY ENGINEER OF WORK OF ANY DISCREPANCIES BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS PRIOR TO STARTING CONSTRUCTION.
LOCATION AND ELEVATION OF IMPROVEMENTS TO BE MET BY WORK TO BE DONE SHALL BE CONFIRMED BY FIELD MEASUREMENTS PRIOR TO CONSTRUCTION OF NEW WORK.
BEFORE EXCAVATING FOR THIS CONTRACT, VERIFY LOCATION OF UNDERGROUND UTILITIES.
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES
SHOWN ON THESE PLANS HAS BEEN OBTAINED FROM AVAILABLE RECORDS ONLY AND MAY NOT REFLECT ALL EXISTING UTILITIES. LOCATIONS OF ALL EXISTING UTILITIES SHALL
BE CONFIRMED BY FIELD MEASUREMENTS BY CONTRACTOR PRIOR TO CONSTRUCTION OF WORK.
CONTRACTOR IS REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY
LINES SHOWN HEREON AND ANY OTHER EXISTING LINES NOT OF RECORD OR NOT SHOWN ON THESE PLANS.
WHERE TRENCHES ARE ADJACENT TO FUTURE BUILDING SITES, SOILS REPORTS WHICH
CERTIFY THAT TRENCH BACKFILL WAS COMPACTED AS DIRECTED BY THE SOILS
ENGINEER IN ACCORDANCE WITH THE ON-SITE EARTHWORK SPECIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER OF WORK BY A QUALIFIED SOILS ENGINEER.
SAFETY FENCES SHALL BE PROVIDED BY THE CONTRACTOR WHERE REQUIRED BY THE CITY ENGINEER.
DURING ACTIVE CONSTRUCTION, AREAS SHALL BE WATERED TO REDUCE FUGITIVE DUST.
CONTRACTOR SHALL ADJUST ALL PROPOSED AND EXISTING FACILITIES TO GRADE.
CONTRACTOR SHALL REMOVE/REPLACE/RELOCATE ALL EXISTING FACILITIES REQUIRED TO INSTALL PROPOSED IMPROVEMENTS.
CONTRACTOR SHALL REMOVE/REPLACE/RELOCATE ANY LANDSCAPING/HARDSCAPING
WHICH CONFLICTS IN ANY WAY WITH THE INSTALLATION OR PROPER FUNCTIONING OF THE PROPOSED IMPROVEMENTS.
CURB HEIGHT SHALL BE 6" FACE UNLESS OTHERWISE NOTED ON THE PLANS.
VID NOTES
LANDSCAPE PLANS FOR THE
CITY OF VISTA
PUBLIC WORKS DEPARTMENT
ADMINISTRATION BUILDING
I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HAVE
EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE CALIFORNIA BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT CITY OF VISTA STANDARDS. I AGREE THAT THE
WORK PERFORMED BY ME COMPLIES WITH GENERALLY ACCEPTED STANDARDS AND PRACTICES OF MY TRADE OR PROFESSION. I FURTHER AGREE THAT THE WORK PERFORMED
HEREIN IS IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF VISTA. I AGREE THAT PLAN CHECK OR REVIEW OF PROJECT DRAWINGS AND SPECIFICATIONS
BY THE CITY OF VISTA IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY
ME, IS CONFINED TO A REVIEW ONLY AND IS NOT A DETERMINATION BY THE CITY OF VISTA
OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND THEREFORE
DOES NOT RELIEVE ME, AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON.
CITY OF VISTA PUBLIC WORKS DEPARTMENT
1165 EAST TAYLOR STREET
VISTA, CA 92084
OWNER:
PROJECT DIRECTORY
LANDSCAPE ARCHITECTURE
ASR LANDSCAPE ARCHITECTURE
CONTACT: ANDREW REESE, PLA
P.O. BOX 7314
RANCHO SANTE FE, CA 92067
PH: (619) 992-8196
E: [email protected]
CONSULTANTS:
WORK TO BE DONE
THE IMPROVEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER:
1. VISTA DEVELOPMENT CODE
2. CITY OF VISTA STANDARD DRAWINGS
3. THIS SET OF PLANS
4. THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREENBOOK) AND THE SAN DIEGO
SPECIAL PROVISIONS
5. THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS AND MAY BE MODIFIED BY THE CITY OF VISTA STANDARDS
6. THE VID STANDARDS AND SPECIFICATIONS
SHEET INDEX
1 LT-1 LANDSCAPE TITLE SHEET
2 LP-1 LANDSCAPE PLANTING AND CONSTRUCTION LEGENDS
3 LP-2 LANDSCAPE CONSTRUCTION PLAN
4 LP-3 LANDSCAPE CONSTRUCTION DETAILS
5 LP-4 LANDSCAPE PLANTING PLAN
6 LP-5 LANDSCAPE PLANTING DETAILS
7 LP-6 LANDSCAPE PLANTING AND CONSTRUCTION DETAILS
8 LP-7 LANDSCAPE PLANTING ADDITIONAL NOTES AND SPECS
8 LI-0 IRRIGATION NOTES AND SCHEDULE
9 LI-1 IRRIGATION PLAN
10 LI-2 IRRIGATION DETAILS
11 LI-3 IRRIGATION DETAILS
VICINITY MAP
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION
PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY
FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD
CITY OF VISTA HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE
OF WORK ON THIS PROJECT, EXCEPT LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF CITY OF VISTA PROFESSIONAL.
THE CONSULTANT'S PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES AND USES OF THESE PLANS. ALL
CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
CONSULTANT'SNOTECONTRACTOR'S NOTE
S
W E
N
14. DUE TO THE POTENTIAL FOR UNCOVERING UNKNOWN SUB-SURFACE TRIBAL CULTURAL RESOURCES,
TRIBAL MONITORING SHALL BE UNDERTAKEN FOR ANY AND ALL ON-SITE AND OFF-SITE GROUND DISTURBING ACTIVITIES, INCLUDING DEMOLITION . IF GROUND DISTURBING ACTIVITIES (E.G.,
EXPLORATORY TRENCHING OR EXCAVATIONS) ARE REQUIRED FOR ANY FORMAL OR INFORMAL
SOLICITATION (WRITTEN OR SPOKEN) OF CONSTRUCTION BIDS OR TO LOCATE EXISTING
UNDERGROUND FACILITIES AHEAD OF ACTUAL CONTSTRUCTION, ALL APPLICABLE REQUIREMENTS IDENTIFIED IN GENERAL NOTES NUMBERS 19 TO 22 ON THE GRADING PLAN SHALL BE UNDERTAKEN BY THE CONTRACTOR.
DEFERRED SUBMITTALS
THE FOLLOWING ITEMS WILL BE SUBMITTED AS SHOP DRAWINGS AT A LATER DATE. NO
CONSTRUCTION OF DEFERRED ITEMS SHALL COMMENCE UNTIL APPROVED AND PERMITTED BY THE VISTA BUILDING OFFICIAL. ALL STRUCTURES OVER 7' IN HEIGHT SHALL BE DESIGNED BY A STRUCTURAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA.
THE INSTALLED SITE LIGHTING SHALL COMPLY WITH THE APPROVED PHOTOMETRIC PLAN REVIEWED BY CITY OF VISTA ENVIRONMENTAL PLANNER AND SECTION 18.58.260 OF THE VISTA DEVELOPMENT CODE.
CONDITION OF PROJECT APPROVAL
SEE CIVIL ENGINEERING PLANS
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
CAUTION: PLAN SIZE AND SCALE MAY HAVE BEEN REPRODUCED. IF SHEET SIZE IS LESS THAN 24"x36" IT MAY BE A REDUCED SIZE PRINT. DRAWINGS SIZES MAY BE INAPPROPRIATE FOR SCALING OFF PLANS. REFER TO WRITTEN DIMENSIONS WHERE APPLICABLE OR BAR SCALES ON PLANS. DO NOT SCALE DIMENSIONS FROM DRAWINGS.
LT-1
IRRIGATION DESIGN
AQUA COMMERCIAL IRRIGATION
CONTACT: DAVID BREZNICK, PLA
810 LOS VALLECITOS BLVD. SUITE 204
SAN MARCOS, CA 92069
PHONE: (760) 750-1999
EMAIL: [email protected]
PLANS AND SCALE NOTE
PUBLIC WORKS DEPARTMENT
ADMINISTRATION BUILDING
LANDSCAPE
TITLE SHEET
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 215 of 357
SYMBOL BOTANICAL NAME COMMON NAME QUANTITY / SIZE REMARKS WUCOLS
PLANT MATERIAL SCHEDULE
CERCIS OCCIDENTALIS
DOUBLESTAKEWESTERNREDBUD7 / 24 BOX
QUERCUS PALUSTRIS STANDARDTRUNKPINOAK5 / 36" BOX
SHRUBS
TREES
AEONIUM UBRICUM PERPLANSALADBOWLAEONIUM53/ 5 GAL
CAREX DIVULSA
60% COVERAGEBERKELEYSEDGEC.C. / 1 GAL. / 18" O.C.
TURF & GROUNDCOVER
ARTIFICIAL TURF BY XGRASS OVER 4" OF D.G. ST. AUGUSTINE PRO W/ C.C. / 566 S.F.
LOW
MED
LOW
LOW
N/APERMANF. SPECS.
18 / 15 GAL LOW
D
CERCIS CANADENSIS DOUBLESTAKEFORESTPANSY2 / 36" BOX
FOREST PANSY'
MED
REDBUD
DOUBLE STAKE
QUERCUS VIRGINIA SOUTHERN LIVE OAK 1 / 48" BOX LOW
MUHLENBERGIA RIGENS DEER GRASS
MUHLENBERGIA LINDHEIMERI AUTUMN GLOW MUHLY
MULTI - TRUNK
DOUBLE STAKE
MULTI TRUNK
LENI'
23 / 15 GAL PER PLAN LOW
SISYRINCHIUM BELLUM BLUE EYED GRASS
LOW
FREESIA x HYBRID 'UCHIDA'FEESIA LOW
40% COVERAGEC.C. / 6" POTS / 18" O.C.
C.C. / 6" CORMS 30% COVERAGE -
RANDOM DRIFTS
SALVIA LEUCANTHA PERPLANMEXICANSAGE53 / 5 GAL LOWLOW
PER PLAN
VINES
CRUSHED GRANITE INORGANIC MULCH (C.C.) / 4" DEEP N/AROCKMULCH3/8" MINUS (WASHED) CAREX FLACA BLUE SEDGE C.C. / 1 GAL . MEDF
PARTHENOCISSUS TRICUSPIDATA BOSTON IVY
VEITCHII'
2 / 15 GAL.
SANSEVIERIA TRIFASCIATA SNAKE PLANT C.C. / 1 GAL . VLS
SESLERIA AUTUMNALIS AUTUMN MOORE GRASS 220 / 5 GAL.LOW
AGAVE ATTENUATA MIXRANDOMFOXTAILAGAVE53 / 5 GAL LOW
ALOE VERA ALOE VERA 27 / 5 GAL.PER PLAN LOW
BOUTELOUA GRACILIS PERPLANBLUEGRAMMAGRASS89 / 5 GAL'BLONDE AMBITION'LOW LEUCOPHYLLUM LAEVIGATUM CHIHUAHUAN SAGE 12 / 15 GAL.PER PLAN LOW 12" O.C.
12" O.C.
PER PLAN
PITTOSPORUM TENUIFOLIUM SILVER SHEEN KOHUHU 2 / 15 GAL.PER PLAN LOW‘SILVER SHEEN'
ESPALIER LOW
PACHYCEREUS MARGINATUS MEXICAN FENCE CACTUS 4 / 24" BOX LOW6' TALL (MATCHING)
HEAT AND SHINE BLOCK
KURAPIA TILL 4" OFSOILKURAPIAGROUNDCOVERC.C. 430 S.F.N/APERMANF. SPECS. 75% BLACK /
25% CREAM
PLUGS 12" O.C.
PORTULACRIA AFRA ELEPHANT FOOD PLANT 10 / 24" BOX LOWPERPLANp u
JUNCUS PATENS "ELK BLUE"CALIFORNIA GRAY RUSH 18 / 5 GAL.LOWPERPLAN 30 / 15 GAL
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
ISSUED FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619.992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR
ASR
1 LANDSCAPE CONSTRUCTION LEGEND:
DESCRIPTION DETAIL / NOTES
SEE DETAIL A/ LP-3
RE: CIVIL ENGINEERING PLANS, DETAILS AND
SPECIFICATIONS.
SEE DETAIL A / LP-3.2
3 SEE CIVIL ENGINEERING PLANS AND
FOR DETAILS AND SPECIFICATIONS.
RE: MANUFACTURER'S DETAILS
AND RECOMMENDATIONS
SYMBOL
PLAIN GRAY CONCRETE
SEALER: MIRACLE 511 POROUS PLUS
INTEGRAL COLORED CONCRETE
MANUFACTURER: DAVIS or EQUAL
COLOR: DARK GRAY (IRON OXIDE) #860
FINISH: TOP CAST #5
SEALER: MIRACLE 511 POROUS PLUS
EXPANSION JOINT
SCORE JOIN
ROCK COBBLE W/ FILTER FABRIC
COLOR: SEE PLANT LEGEND
SUPPLIER: SAN DIEGO ROCK SUPPLY
www.sdrocksupply.com)
8" WIDE CONCRETE MOW CURB
6' TALL MASONARY WALL AND FOOTER
6' TALL METAL FENCE
ROOT BARRIERS
6" WIDE CONCRETE MOW CURB
ARTIFICIAL TURF
MANF: XGRASS - ST. AUGUSTINE PRO w/
HEAT AND SHINE BLOCK.
TRUNCATED DOMES
4 6
7 8
SEE DETAIL C / LP-3
9 SEE STRUCTURAL ENGINEERING PLANS, DETAILS
AND SPECIFICATIONS.
SEE ARCHITECTURAL PLANS
SEE DETAIL C,D & E / LP-5
5 LANDSCAPE
PLANTING &
CONSTRUCTION
LEGENDS
SEE DETAIL A / LP-3
RE: CIVIL ENGINEERING PLANS, DETAILS AND
SPECIFICATIONS.
SEE DETAIL B / LP-3
RE: CIVIL ENGINEERING PLANS, DETAILS AND
SPECIFICATIONS.
LP-1
10 SEE DETAIL D / LP-3
11 SEE CIVIL ENGINEERING PLANS, DETAILS AND
SPECIFICATIONS FOR DRAINAGE AND GRADING..
SEE DETAIL E / LP-3
INSTALL PER MANUFACTURER' DETAILS,
SPECIFICATIONS AND RECOMMENDATIONS.
12 SEE CIVIL ENGINEERING PLANS, DETAILS AND
SPECIFICATIONS FOR DRAINAGE AND GRADING..
CONSTRUCTION NOTES:
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 216 of 357
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
ISSUED FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619.992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR
ASR
LP-2GRAPHICSCALE: 1" = 8'
8' 4' 0'8'16'
S
W E
N
EAST TAYLOR STREET
LANDSCAPE
CONSTRUCTION
PLAN
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 217 of 357
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
ISSUED FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619.992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR
ASR
LP-3
1/8" WIDE SAW CUT MIN. 1/3 DEPTH
OF PAVEMENT
SAW CUT JOINT
ALTERNATE - HIDDEN
EXPANSION JOINT
EXPANSION JOINT
LANDSCAPE
CONSTRUCTION
DETAILS
FILTER FABRIC / WEED BARRIER BETWEEN D.G.
AND COMPACTED SUBGRADE.
EXISTING SOIL
ADJACENT HARDSCAPE, WALL
OR BUILDING WALL
IN-LINE IRRIGATION EMITTER TUBING
RE: IRRIGATION PLANS AND DETAILS.
INSTALL ABOVE FILTER FABRIC AND BELOW
LANDSCAPE EDGING (IF ANY).
4" THICK ROCK MULCH PLANTING AREA. FINISH
GRADE TO BE FLUSH WITH ADJACENT
HARDSCAPE (TYP.).
1 LEGEND:
2 3
4 5
1 45
2 3
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 218 of 357
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
ISSUED FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619.992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR
ASR
LP-4GRAPHICSCALE: 1" = 10'
10'5' 0'10'20'
S
W E
N
VISTA PLANTING PLAN NOTES:
1. ALL AREAS THAT ARE GRADED OR DISTURBED AS A RESULT OF THE PROJECT MUST BE RE-LANDSCAPED TO THE REQUIREMENTS OF THE CITY OF VISTA'S WATER EFFICIENT LANDSCAPING ORDINACE (CHAPTER 18.56) AND THE CITY OF VISTA'S LANDSCAPE MANUAL.
2. THE PROJECT LANDSCAPE ARCHITECT SHALL SUPERVISE THE INSTALLATION TO ENSURE THAT THE WORK IS INSTALLED PER THE PLANS APPROVED BY THE CITY. THIS SHALL INCLUDE AN OBSERVATION OF THE IRRIGATION SYSTEM OF ALL POINTS OF
CONNECTION (PRIOR TO BACKFILL), BACKFLOW PREVENTION DEVICES, MAINLINES, ELECTRICAL CONNECTIONS, AUTOMATIC
CONTROLLERS, CONTROL VALVES, AS WELL AS ALL SOIL AMENDMENTS, ROOT BARRIERS, EXISTING AND PROPOSED PLANTINGS, TREE STAKING AND MULCH. THE COMPLETED IRRIGATION SYSTEM MUST BE TESTED TO VERIFY ADEQUATE COVERAGE AND THAT NO OVERSPRAY OR RUNOFF IS OCCURRING.
3. PRIOR TO THE REQUEST OF THE APPLICANT FOR REVIEW AND APPROVAL BY THE CITY OF THE PROJECT'S COMPLETION,
PROVIDE AN IRRIGATION SCHEDULE SHOWING THE TIME PERIOD WHEN THE IRRIGATION WILL BE SCHEDULED AND CONFIRM THAT NO OVERHEAD IRRIGATION SHALL BE USED BETWEEN THE HOURS OF 10:00 A.M. AND 8:00 P.M. AND IN CONFORMANCE WITH CURRENT VISTA IRRIGATION DISTRICT'S RESTRICTIONS.
4. THE SUBMISSION BY THE PROJECT LANDSCAPE ARCHITECT'S CERTIFICATE OF COMPLETION SHALL SERVE AS FORMAL REQUEST FOR FINAL OBSERVATION BY THE CITY. THE CERTIFICATE OF COMPLETION SHALL INCLUDE:
4.1. CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS WITH ANY DEVIATIONS NOTED;
4.2. AN UPDATED IRRIGATION SCHEDULE';
4.3. SOILS MANAGEMENT REPORT.
LANDSCAPE
PLANTING
PLAN
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 219 of 357
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
ISSUED FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619.992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR
ASR
LP-5
RO
O
T
B
A
LL
DE
P
T
H
O
F
3X ROOTBALL WIDTH
TYP.
TY
P
PREVAILING
CU
T
6 B
E
LO
W
BR
A
N
C
H
C
A
N
O
P
Y
WIND
FINISH GRADE
12" MIN.
ALL SIDES
COLLAR
1"-2" ABOVE
4" DIA. PEFORATED RIGID PVC PIPE
WITH FILTER SOCK AND GRATE (TYP.),
IN TWO PLACES. DO NOT FILL PIPE
WITH GRAVEL.
UNDISTURBED SOIL
PLANTING BACKFILL (PER SPECS).
BACKFILL AND COMPACT IN 8" LIFTS
PUDDLE & SETTLE AFTER SETTING
TREE).
ROUGHEN SIDES & BOTTOM
OF PLANTING PIT
PLANTING TABLETS (PER SPECS)
BARK MULCH OR D.G. (PER SPECS.)
4" HIGH WATER BASIN (DURING THE
MAINTENANCE PERIOD).
OMIT IN TURF AREAS.
TREE STAKE-ALL STAKES CUT 12"
BELOW BRANCH CANOPY
4 CINCH-TIES MIN. (2 AT TOP
OF STAKE, OTHERS WHERE
NECESSARY TO SUPPORT TREE).
TIE IN FIGURE-8 FASHION.
GALVANIZED NAIL TYP.
FINISH GRADE
PREVAILING
WIND
8'-
0 4'-
0 12"
4"
MIN
BE
LO
W
BO
TT
O
M
O
F
RO
O
T
B
A
LL
BACKFILL HOLES
BELOW ROOTBALL
WITH GRAVEL.
SEE SPECS.
FLAT OR MINOR SLOPES)
2X ROOTBALL WIDTH (
SLOPES 4:1 OR GREATER)
CURB, WALL, OR EDGE OF
PAVING
10'
10'
10'
PROPOSED TREE
LIMITS OF ROOT
BARRIER TO BE 10'
FROM CENTER OF
TREE ON EITHER
SIDE
INSTALL ROOT
BARRIER ADJACENT TO
CURB, WALL, OR EDGE
OF PAVING
INSTALL ROOT BARRIER TO ALL
TREES WITHIN 10' OF CURB OR
PAVING
PLANTING AREA
TOP OF ROOT CONTROL BARRIER
4" (MIN.) IN SHRUB AREAS WITH BARK
GUIDES FACING TOWARDS THE
FLUSH WITH GRADE. PANELSSHALLBEINSTALLEDWITHROOT
TREE TRUNK.
BACKFILLED WITH CLEAN SITE
ROOT CONTROL BARRIER TRENCH
SIDEWALK, CURB, SWALE
24" X 24" ROOT CONTROL SYSTEM BY
20 LINEAR FEET OF BARRIER REQUIRED FOR
BIOBARRIER (1-877-642-9929) FOR TREES
OR PAVEMENT
3 5
1 4
5 4
SOIL.
3 2
1 D.G. AREAS AND TURF AREAS.
MULCH OR ROCK MULCH. FLUSH IN
NOTE:
REFER TO DETAIL "C" &"E" THIS SHEET
AND SHEET LP-7 FOR ADDITIONAL
INFORMATION AND SPECIFICATIONS.
EACH TREE (MIN.). 8 LINEAR FEET OF
BARRIER FOR REMAINING REQUIRED FOR
SMALL TREES AND LARGE SHRUBS (TYP.).
WITHIN 10' OF HARDSCAPE. CENTURY
OR EQUAL,MAY BE USED FOR ON SITE TREES.
DO NOT USE PANELED TYPE ROOT BARRIERS.
USE POLYETHYLENE CONTINUOUS .06 MIL
THICKNESS (MIN.) OR THICKER.
LANDSCAPE
PLANTING
DETAILS
NOTE:
REFER TO DETAIL "D" &"E" THIS SHEET
AND SHEET LP-7 FOR ADDITIONAL
INFORMATION AND SPECIFICATIONS.
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 220 of 357
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
ISSUED FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619.992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR
ASR
LP-6
MINIMUM PLANTING PIT WIDTHS
1 GAL. CONTAINER
15 GAL. CONTAINER
5 GAL. CONTAINER
SHRUB - CENTER IN PIT
18" DIAMETER
24" DIAMETER
30" DIAMETER
COLLAR 1" ABOVE
AMENDED PLANTING BACKFILL.
BACKFILL AND COMPACT IN
8" LIFTS (PUDDLE & SETTLE
AFTER SETTING SHRUB).
FINISH GRADE
BARK MULCH OR ROCK MULCH
PER SPECIFICATIONS
3" DEPTH WATERING BASIN
BERM 12" MIN. FROM TRUNK
SLOPE 1/4" / FT
GRADEFINISH
ROOTBALL
PLANTING TABLET (TYP.)
PLACE IN PIT 2/3 UP FROM PIT BOTTOM
PER SPECIFICATIONS
ROUGHEN SIDES AND BOTTOM OF
PLANTING PIT
UNDISTURBED SOIL
BARK MULCH AND/OR
EROSION-CONTROL
MATTING (PER SPECS.)
BARK MULCH
PER SPECIFICATIONS
UNDISTURBED SOIL
ROUGHEN SIDES AND
BOTTOM OF PLANTING PIT
PLANTING TABLET (TYP.)
PLACE IN PIT 2/3 UP FROM PIT BOTTOM
PER SPECIFICATIONS
COLLAR 1" ABOVE
AMENDED
PLANTING BACKFILL.
BACKFILL AND COMPACT IN
8" LIFTS (PUDDLE & SETTLE
AFTER SETTING SHRUB).
4" HEIGHT MOUNDED
PERMANENT WATERING BASIN
1 GAL. CONTAINER
15 GAL. CONTAINER
5 GAL. CONTAINER
MINIMUM PLANTING PIT WIDTHS
24" DIAMETER
30" DIAMETER
18" DIAMETER
BERM FIRMLY COMPACTED 12" MIN.
FROM TRUNK ON ALL SIDES
APPROX. LINE OF SLOPE
3:1 MAX ALLOWED
SHRUB - CENTER IN PIT
FINISH GRADE
SET TOP OF ROOTBALL 1" ABOVE SURROUNDING
GRADE AND SLOPE FOR DRAINAGE. DO NOT COVER
CROWNS OF PLANTS WITH EXCESS SLOPE SOIL
TO CREATE WATERING BASINS (TYP.).
SET TOP OF ROOTBALL 1" ABOVE SURROUNDING
GRADE AND SLOPE FOR DRAINAGE. DO NOT COVER
CROWNS OF PLANTS WITH EXCESS SLOPE SOIL
TO CREATE WATERING BASINS (TYP.).
PLANTS SHALL BE EQUAL
DISTANT APART (SEE PLANT
LIST AND PLANT SPACING
DETAIL FOR SPACING)
3" MIN. MULCH OVER
ENTIRE BED; DO NOT
COVER CROWNS OF
PLANTS - KEEP MULCH
2" MOUNDED SAUCER
CONTINUOUS
PLANTING BED
EXTENDING
UNDER PLANTS;
USE SPECIFIED
BACKFILL
SUBGRADE
2" TO 3" AWAY
FINISHED GRADE
LAWN FROM SOD
TILLED SUBGRADE - REMOVE ROCKS
SUBGRADE
AND DEBREE GREATER THAN 1"
IN SIZE. NOT APPLICABLE FORLAWNATBOTTOMOFSTORMDETENTION BASIN OR SOD OVER GEOTEXTILES.
LANDSCAPE
PLANTING
DETAILS
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 221 of 357
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
ISSUED FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619.992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR
ASR
LP-7
RECORD DRAWINGS:
1. BEFORE FINAL ACCEPTANCE OF WORK, THE CONTRACTOR SHALL PROVIDE A REDLINE AS-BUILT" SET OF DRAWINGS SHOWING THE SPRINKLER SYSTEM AS INSTALLED TO THE OWNER. INFORMATION SHALL BE IN A LEGIBLE FORMAT SUITABLE FOR REPRODUCTION PURPOSES.
2. ANY CHANGES IN LOCATION OF ITEMS OR TYPE OF INSTALLATIONS FROM THAT
SHOWN ON DRAWINGS SHALL BE SO INDICATED ON THE RECORD DRAWINGS AND DIMENSIONED FROM AT LEAST TWO FIXED POINTS.
3. VALVES SHALL BE NUMBERED AND CORRESPONDING NUMBERS SHALL BE SHOWN ON THE "AS-BUILT" DRAWINGS.
4. CONTROLLER, BACKFLOW ASSEMBLIES, REMOTE CONTROL VALVES, BALL VALVES, AND QUICK COUPLER VALVES SHALL BE LOCATED BY MEASURED DIMENSIONS. DIMENSIONS SHALL BE GIVEN TO PERMANENT OBJECTS AND SHALL BE TO THE NEAREST FOOT.
5. ON THE INSIDE SURFACE OF THE COVER OF THE AUTOMATIC CONTROLLER, PREPARE
AND MOUNT A COLOR-CODED CHART SHOWING THE VALVES, MAINLINE, AND SPRINKLER HEADS SERVICED BY THE CONTROLLER. ALL VALVES SHALL BE NUMBERED TO MATCH THE OPERATION SCHEDULE AND THE DRAWINGS. THIS CHART SHALL BE A PLOT PLAN, SHOWING BUILDING, WALKS, ROADS AND WALLS. A PHOTOSTATIC PRINT OF THIS PLAN, REDUCED AS
NECESSARY AND LEGIBLE IN ALL DETAILS, SHALL BE MADE TO A SIZE THAT WILL FIT INTO THE CONTROLLER COVER. THIS PRINT SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT AND SHALL BE HERMETICALLY SEALED IN PLASTIC. THIS PLAN SHALL THEN BE SECURED TO THE BACK OF THE ENCLOSURE DOOR.
6. ON THE LID OF EACH REMOTE CONTROL VALVE BOX, HEAT IMPRINT THE VALVE DESIGNATION NUMBER.
7. IMMEDIATELY UPON THE INSTALLATION OF ANY BURIED PIPE OR EQUIPMENT, THE CONTRACTOR SHALL INDICATE ON THE DRAWINGS THE LOCATIONS OF SAID EQUIPMENT.
DIMENSIONS SHALL BE GIVEN FROM PERMANENT OBJECTS SUCH AS BUILDINGS, SIDEWALKS, CURBS AND DRIVEWAYS.
PLANTING NOTES:
1. THE PLANTING PLANS ARE DIAGRAMMATIC. MINOR ADJUSTMENTS IN PLANT LOCATIONS AND TYPE MAY BE MADE AT THE DISCRETION OF LANDSCAPE ARCHITECT OR CITY.
2. DO NOT DAMAGE PLANT ROOTBALL, CANOPY OR TRUNK DURING TRANSPORTATION OR PLANTING PROCESS.
3. ALL PLANT MATERIAL SHALL BE SUBJECT TO THE REVIEW AND APPROVAL OF THE LANDSCAPE ARCHITECT. PLANT MATERIALS SHALL BE REPLACED UPON REQUEST OF THE LANDSCAPE ARCHITECT OR CITY BEFORE OR AFTER INITIAL PLANTING. THE
CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT A MINIMUM OF ONE WEEK IN ADVANCE BEFORE DELIVERY OF PLANT MATERIALS TO THE SITE. THE LANDSCAPE ARCHITECT MAY ELECT TO SELECT AND TAG NEW TREES AT A NURSERY OF THEIR CHOOSING BEFORE DELIVERY TO THE SITE. IF NOT, THEN ALL TREE SPECIES SELECTED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL BY PHOTO SUBMITTAL BEFORE DELIVERY TO THE SITE.
ALL REMAINING PLANT MATERIALS SHALL BE SUBMITTED AS PHOTO SUBMITTALS TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL BEFORE DELIVERY TO THE SITE.
4. PLANTS IN ANY PHOTO SUBMITTAL MUST BE SHOWN CLEARLY, TO SCALE AND SHALL CONTAIN THE NURSERY OF ORIGIN.
LANDSCAPE PHOTO SUBMITTALS SHALL CONTAIN ALL PLANTING MATERIALS PROPOSED FOR THE SITE AND/OR ANY SUBSTITUTIONS IE. (BE A COMPLETE SUBMITTAL). PARTIAL OR INCOMPLETE LANDSCAPE SUBMITTALS SHALL BE SUBJECT TO ADDITIONAL SERVICES REQUEST BY THE LANDSCAPE ARCHITECT.
5. THE LANDSCAPE CONTRACTOR SHALL REVIEW AND INSPECT ALL PLANT MATERIAL UPON DELIVERY TO THE PROJECT SITE.
DAMAGED, UNHEALTHY, NON-STANDARD SIZED AND POOR PLANTING MATERIALS SHALL BE REJECTED AND REMOVED FROM THE PROJECT SITE. NO PLANTING MATERIALS WITH DAMAGED BARK, PEST INFESTATIONS, TOPPED OR TRIMMED BRANCHES, ROOT BOUND OR OTHER ISSUES SHALL BE ACCEPTABLE FOR USE ON THE PROJECT.
6. PLANT MATERIALS DELIVERED TO THE SITE AND REJECTED BY THE CITY OR LANDSCAPE ARCHITECT SHALL BE REMOVED IMMEDIATELY FROM THE PROJECT SITE.
7. ALL TYING MATERIALS AND MARKING TAPES SHALL BE REMOVED AT THE TIME OF PLANTING.
8. ALL PLANTS SHALL BE INSTALLED IN A VERTICAL MANNER AND HAVE SUFFICIENT TIE-DOWNS TO ASSURE THEIR VERTICALITY DURING LIFE OF THE CONTRACT AND MAINTENANCE PERIOD.
9. THE CONTRACTOR SHALL NOT ALLOW CONCRETE DUST OR OTHER POTENTIALLY TOXIC CONSTRUCTION MATERIAL TO BE SWEPT OR DRAINED INTO PLANTING AREAS OR DRAINAGE INLETS.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING SOIL SAMPLES, OBTAINING SOIL ANALYSIS TESTS, PROVIDING A COPY OF RESULTS INCLUDING RECOMMENDATIONS TO THE CITY AND LANDSCAPE ARCHITECT. ADJUSTMENTS TO THE SPECIFIED SOIL AMENDMENTS HEREIN MAY BE REQUESTED BY THE CITY TO CONFORM TO THE ANALYSIS RECOMMENDATIONS. HOWEVER, ANY CHANGES MUST BE MADE AFTER THE CONTRACTOR RECEIVES WRITTEN AUTHORIZATION FROM THE CITY.
11. THE CONTRACTOR SHALL ENSURE THAT ALL EXISTING HARDSCAPE, SOFTSCAPE, UTILITIES AND OTHER SITE FURNISHINGS IN THE PUBLIC RIGHT-OF-WAY AND ADJACENT PROPERTY SHALL BE PROTECTED IN PLACE.
12. THE CONTRACTOR(S) SHALL COORDINATE BETWEEN HARDSCAPE AND DRAINAGE PLANS (CIVIL ENGINEERING PLANS) LANDSCAPE
CONSTRUCTION, AND PLANTING CONSTRUCTION TO ENSURE PLANTING BEDS, SCORE JOINTS, LANDSCAPE EDGING AND MOW CURBS ARE ALIGNED PER PLANS.
13. ALL LANDSCAPE PLANTING AREAS SHALL BE AMENDED WITH SOIL AMENDMENTS PER THE AGRONOMIC SOILS TEST RECOMMENDATIONS. ANY DISCREPANCIES WILL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT FOR RESOLUTION. ALL RECOMMENDATIONS AND FERTILIZERS SHALL BE ORGANIC AND TESTED WITH RECOMMENDATIONS FOR ORGANIC MATERIALS.
14. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR VERIFYING ALL PLANTING AREAS AND PLANT MATERIAL REQUIRED TO THE SATISFACTION OF THE LANDSCAPE ARCHITECT AND CITY. PROPOSED PLANTING Q UANTITIES ARE AN ESTIMATE ONLY FOR THE CONTRACTOR'S CONVENIENCE. PLAN SYMBOLS TAKE PRECEDENCE OVER QUANTITIES SHOWN .CONTRACTOR TO COMPUTE
QUANTITIES FOR PLANTS LISTED BY ON-CENTER SPACING AND SUBMIT TO THE LANDSCAPE ARCHITECT FOR APPROVAL BEFORE PROCEEDING WITH THEIR WORK.
15. ALL TREES WITHIN A SPECIES SHALL HAVE MATCHING FORM UNLESS OTHERWISE NOTED IN THE DRAWINGS. TREES ARE ALIGNED TO A PRECISE LAYOUT AS SHOWN ON PLAN. THE CONTRACTOR SHALL ENSURE TREES ARE TO BE PLACED EXACTLY AS SHOWN TO A TOLERANCE OF WITHIN 4" MEASURED IN THE HORIZONTAL PLANE.
16. ALL TREES PLANTED WITHIN 10' OF A HARDSCAPE CONDITION WITHIN THE PROJECT BOUNDARY AND 10' WITHIN THE PUBLIC RIGHT-OF-WAY SHALL HAVE ROOT BARRIERS INSTALLED PER NOTES, DETAILS AND SPECIFICATIONS.
17. CONTRACTOR SHALL INSTALL PLANT MATERIALS IN THE FOLLOWING SEQUENCE: A. TREES, B. SPECIMEN SHRUBS, C. SHRUBS, D.
GROUND COVER. FINAL LOCATION OF ALL PLANT MATERIALS SHALL BE SUBJECT TO THE REVIEW AND APPROVAL OF THE LANDSCAPE ARCHITECT. THE CONTRACTOR SHALL COMPLETE THE FOLLOWING TASKS BEFORE BEGINNING PLANTING OPERATIONS.
17.1. TREES - STAKE EACH LOCATION PRIOR TO DIGGING HOLES. ANY TREE PLANTED WITHOUT IT'S FINAL LOCATION APPROVED BY THE LANDSCAPE ARCHITECT SHALL BE RELOCATED / REPLACED AT THE SOLE EXPENSE OF THE CONTRACTOR.
17.2. SPECIMEN 5 GALLON SHRUBS - STAKE EACH LOCATION PRIOR TO DIGGING HOLES. ANY SPECIMEN SHRUB PLANTED WITHOUT
IT'S FINAL LOCATION APPROVED BY THE LANDSCAPE ARCHITECT SHALL BE RELOCATED / REPLACED AT THE SOLE EXPENSE OF THE CONTRACTOR.
17.3. SHRUBS - STAKE OUT ALL PLANTING BEDS AND LAYOUT ALL OF THE ACTUAL PLANTING CONTAINERS ON SITE PRIOR TO DIGGING HOLES.
18. ALL PLANTED (NON TURF) FLAT AREAS SHALL RECEIVE A MINIMUM 3" MEDIUM SHREDDED DECORATIVE MULCH LAYER UNLESS OTHER FORMS OF MULCH ARE NOTED. ALL PLANTED (NON TURF) SLOPE AREAS SHALL RECEIVE A MINIMUM OF 3" SHREDDED REDWOOD (GORILLA HAIR) MULCH LAYER UNLESS OTHER FORMS OF MULCH ARE NOTED. CONTRACTOR SHALL SUBMIT MULCH SAMPLES TO THE LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO BULK DELIVERY TO THE SITE.
19. PER THE 2015 UPDATE TO THE STATE OF CALIFORNIA MODEL WATER EFFICIENT LANDSCAPE ORDINANCE, THE SOIL SHALL BE AMENDED WITH A MINIMUM OF 4 CUBIC YARDS OF COMPOST PER 1000 S.F. AND INCORPORATED TO A DEPTH OF SIX INCHES. ALL OTHER AMENDMENTS SHALL BE PER THE AGRONOMIC SOILS REPORT.
20. ANY DISCREPANCIES BETWEEN THE PLANS, NOTES AND SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT IMMEDIATELY FOR RESOLUTION BEFORE THE CONTRACTOR PROCEEDS WITH THEIR WORK.
21. ALL LANDSCAPING AND IRRIGATION SHALL CONFORM TO THE DEVELOPMENT STANDARDS OF THE CITY OF VISTA IN ADDITION TO ALL OTHER LANDSCAPE RELATED CITY AND REGIONAL STANDARDS.
22. ALL NON PLANTED SOFTSCAPE PAVING AREAS INCLUDING ROCK MULCH AREAS AND DECOMPOSED GRANITE AREAS SHALL INCLUDE A COMMERCIAL GRADE (30 YEAR WARRANTY) FILTER FABRIC/ WEED BARRIER THAT SHALL SEPARATE THE EXISTING GRADE FROM ANY NEW MATERIALS. IRRIGATION LINES SHALL BE INSTALLED ABOVE THE FILTER FABRIC / WEED BARRIER WHERE REQUIRED.
SAMPLES SHALL BE SUBMITTED TO THE LANDSCAPE ARCHITECT FOR APPROVAL BEFORE PURCHASE AND INSTALLATION.
23. ALL REQUIRED LANDSCAPE AREAS SHALL BE MAINTAINED BY THE CONTRACTOR FOR 90 DAYS. THE MATERIAL SHALL BE MAINTAINED IN A HEALTHY GROWING CONDITION. DISEASED OR DEAD PLANT MATERIAL SHALL BE SATISFACTORILY TREATED OR REPLACED AT THE REQUEST OF THE LANDSCAPE ARCHITECT OR OWNER.
24. ALL LANDSCAPING AND IRRIGATION SHALL CONFORM TO THE STANDARD OF THE CITYWIDE LANDSCAPE REGULATIONS IN THE MUNICIPAL CODE PLUS ALL OTHER LANDSCAPE RELATED CITY AND REGIONAL STANDARDS.
SOILS REPORT:
1. AN AGRONOMIC SOIL REPORT AND SOIL ANALYSIS FROM A CERTIFIED, CITY APPROVED,
LABORATORY IS REQUIRED BY THE CONTRACTOR AND SHALL BE SUBMITTED TO THE
LANDSCAPE ARCHITECT AND CITY PRIOR TO COMMENCEMENT OF SOIL AMENDING FOR APPROVAL.
2. THE AGRONOMIC SOIL TESTING RESULTS AND RECOMMENDATIONS WILL BE PREPARED FOLLOWING GRADING AND PRIOR TO PLANTING.
3. THE SUBMITTED SOIL ANALYSIS SHALL INCLUDE THE FOLLOWING: SOIL TEXTURE,
PERCENTAGE OF ORGANIC MATTER, SOIL INFILTRATION RATE (MEASURED OR
DERIVED FROM SOIL
TEXTURE/INFILTRATION RATE), TABLES, PH AND TOTAL SOLUBLE SALTS,
MACRO-NUTRIENTS, MICRO-NUTRIENTS AND RECOMMENDATIONS FOR AMENDMENTS,
FERTILIZERS AND LONG-TERM MAINTENANCE FOR SLOPES, ORNAMENTAL PLANTING, TURF, AND NATIVE AREAS.
4. ALL PROPOSED SOIL AMENDMENT MATERIALS AND FERTILIZERS SHALL BE ORGANIC
ONLY AND DERIVED FROM COMPOSTED MATERIALS (NO SEWAGE SLUDGE ALLOWED) REQUIRED FOR PRE-PLANT / INSTALLATION / LONG-TERM MAINTENANCE.
5. REPORT RECOMMENDATIONS SHALL SUPERSEDE ANY PREVIOUSLY PUBLISHED SOIL PREPARATION INFORMATION.
23. GRAPHIC SYMBOLS ON THESE PLANS ARE DIAGRAMMATIC. GROUNDCOVER PLANTINGS SHALL INSTALLED WITHIN 12" OF LARGER PLANT MATERIALS AT TIME OF INSTALLATION.
24. SEE CIVIL ENGINEERING PLANS FOR HARDSCAPE DESIGN, DETAILS AND SPECIFICATIONS INCLUDING HORIZONTAL AND VERTICAL CONTROL (LAYOUT).
MAINTENANCE BY THE CONTRACTOR:
1. THE MAINTENANCE PERIOD SHALL BEGIN ON THE FIRST DAY AFTER ALL LANDSCAPE AND IRRIGATION WORK ON
THE PROJECT IS COMPLETE, CHECKED, ACCEPTED, AND WRITTEN APPROVAL FROM THE CITY AND LANDSCAPE ARCHITECT IS GIVEN TO BEGIN THE MAINTENANCE PERIOD. MAINTENANCE PERIOD SHALL CONTINUE THEREAFTER FOR NO LESS THAN 90 CONTINUOUS CALENDAR DAYS.
2. SOIL CONDITIONERS AND FERTILIZERS ARE TO BE USED ONLY WITH THE APPROVAL OF THE CITY'S ENVIRONMENTAL REVIEW STAFF TO PROTECT DOWNSTREAM WATERCOURSES.
3. CONTINUOUSLY MAINTAIN ALL INVOLVED AREAS DURING THE PROGRESS OF THE LANDSCAPING OPERATIONS AND DURING THE MAINTENANCE PERIOD UNTIL THE FINAL ACCEPTANCE OF THE WORK BY THE CITY.
4. REGULAR PLANTING MAINTENANCE OPERATIONS SHALL BEGIN IMMEDIATELY AFTER EACH PLANT IS PLANTED.
PLANTS SHALL BE KEPT IN A HEALTHY, GROWING CONDITION AND IN A VISUALLY PLEASING APPEARANCE BY
WATERING, PRUNING, TRIMMING, EDGING, FERTILIZING (WITH APPROVAL), RE-STAKING, PEST AND DISEASE CONTROLLING, SPRAYING, WEEDING, CLEANING-UP AND OTHER OPERATIONS OF MAINTENANCE. LANDSCAPE
AREAS SHALL BE KEPT FREE OF WEEDS, NOXIOUS GRASS, AND OTHER UNDESIRED VEGETATIVE GROWTH AND DEBRIS. PLANTS FOUND TO BE DEAD OR IN AN IMPAIRED CONDITION SHALL BE REPLACED IMMEDIATELY.
5. THE IRRIGATION SYSTEM SHALL REQUIRE CONTINUOUS MAINTENANCE, CLEANING, ADJUSTMENT, PART REPLACEMENT AND INSPECTION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE THESE
SERVICES ON A CONTINUAL AND REGULAR BASIS DURING THE MAINTENANCE PERIOD TO INSURE THE IRRIGATION SYSTEM IS PROPERLY OPERATED WITHOUT ANY PROBLEMS.
6. COMPLETION DATE OF THE CONTRACT MAINTENANCE PERIOD WILL BE EXTENDED, WHEN IN THE OPINION OF
THE LANDSCAPE ARCHITECT AND THE CITY, IMPROPER MAINTENANCE OR THE UNHEALTHY CONDITION OF PLANTED MATERIAL IS EVIDENT AT THE TERMINATION OF THE SCHEDULED MAINTENANCE PERIOD.
CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ADDITIONAL LANDSCAPE MAINTENANCE UNTIL LANDSCAPING IS COMPLETED AND ACCEPTABLE.
7. CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR MAINTAINING ADEQUATE PROTECTION OF LANDSCAPE AREAS. REPAIR DAMAGED AREAS IMMEDIATELY.
SPECIAL NOTES - EXISTING TREES TO REMAIN:
1. EXISTING TREES THAT ARE TO REMAIN ON SITE SHALL BE PROTECTED IN PLACE.
2. CONTRACTOR SHALL UTILIZE AN AIR SPADE TO EXCAVATE THE SOIL AROUND EACH EXISTING TREE TO
REMAIN INSIDE THE LIMIT OF WORK AND THAT SHALL BE IMPACTED BY NEWLY PROPOSED PLANTING AND IRRIGATION WITHIN THE PROJECT LIMITS OF WORK.
3. CONTRACTOR SHALL TAKE GREAT CARE IN PROTECTING THE EXISTING ROOTS OF EACH TREE AND SHALL PLACE AMENDED BACKFILL, PLANT AND LAYOUT THE IRRIGATION SYSTEM BY HAND .
4. THE CONTRACTOR SHALL USE THE DRIP LINE OF EACH TREE AS A GENERAL RULE WHEN ESTABLISHING
PLANTING AREAS OF IMPACT TO THE EXISTING TREE IN REGARDS TO AIR SPADING, HOWEVER, IMPACT
AREAS MAY EXTEND OUTSIDE THE DRIP LINE OF AN EXISTING TREE WHERE SHALL SURFACE ROOTS ARE VISIBLE (AT THE SURFACE).
ADDITIONAL IRRIGATION NOTES & SPECIFICATIONS
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN INDEPENDENT, THIRD PARTY IRRIGATION AUDIT OF THE ENTIRE IRRIGATION SYSTEM ONCE COMPLETE. THE CONTRACTOR SHALL SUBMIT THE THIRD PARTY'S IRRIGATION AUDIT TO THE LANDSCAPE ARCHITECT AND OWNER FOR THEIR REVIEW AND RECORDS BEFORE THE 90 DAY LANDSCAPE MAINTENANCE PERIOD SHALL BEGIN. ANY AND ALL DEFICIENCIES IDENTIFIED BY THE INDEPENDENT THIRD PARTY AUDIT AND/OR THE LANDSCAPE ARCHITECT SHALL BE COMPLETED BEFORE THE END OF THE 90 DAY MAINTENANCE PERIOD.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULL AND COMPLETE IRRIGATION COVERAGE OF ALL NEW PLANTING AREAS.
3. THE CONTRACTOR SHALL PROVIDE IRRIGATION DRIP LINE TUBING OVER (ON TOP OF) THE ROOT BALL OF EACH TREE IN ADDITION TO PROVIDING EACH TREE WITH A SEPARATE IRRIGATION BUBBLER (OR OTHER) SYSTEM.
4. THE CONTRACTOR SHALL ADJUST DRIP LINE TUBING AND SPRINKLERS (ROTATE SPRINKLERS) AT ALL VERTICAL OBSTRUCTIONS SUCH AS POLES, UTILITY BOXES, ETC.
5. THE CONTRACTOR SHALL SUBMIT A WRITTEN CONFIRMATION TO THE LANDSCAPE ARCHITECT AND OWNER UPON COMPLETION OF THE IRRIGATION SYSTEM STATING THAT THE CONTROLLER, MASTER VALVE AND FLOW SENSORS HAVE BEEN PROPERLY INSTALLED AND COMMUNICATE / COORDINATE WITH EACH OTHER. THIS CONFIRMATION SHOULD INCLUDE A WRITTEN STATEMENT THAT THE INSTALLED IRRIGATION SYSTEM HAS BEEN OWNER BEFORE THE 90 LANDSCAPE MAINTENANCE PERIOD SHALL BEGIN.
6. SEE CIVIL ENGINEERING PLANS FOR IRRIGATION METERS AND BACKFLOW PREVENTER ASSEMBLY(S). CONTRACTOR TO COORDINATE WITH THE COUNTY
OF SAN DIEGO AND OTHER APPLICABLE JURISDICTIONS HAVING AUTHORITY OVER THE PROJECT FOR THE TESTING AND CERTIFICATION OF THE BACKFLOW PREVENTERS. THE CONTRACTOR SHALL SUBMIT WRITTEN TEST RESULTS AND CERTIFICATION TO THE LANDSCAPE ARCHITECT, COUNTY OF SAN DIEGO AND OTHER APPLICABLE AGENCIES HAVING JURISDICTION OVER THE PROJECT.
LANDSCAPE
ADDITIONAL
PLANTING
NOTES AND
SPECIFICATIONSALTERNATEBIDITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 222 of 357
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619. 698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
668('FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619. 992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR / ACI
ASR / ACI
LANDSCAPE
IRRIGATION
LEGEND
AND NOTES
LI-1
IRRIGATION SCHEDULE:
A
SYMBOL
EFB-CPRAINBIRD
MODELNUMBERMANUFACTURER DESCRIPTION
GALLONS PER MINUTE
CONTROLLER & STATION NO.
ELECTRIC CONTROL VALVE SIZE
PLANT TYPE
HYDRO-ZONE
2"1 1/4"
1"
3/4"
LATERAL PIPE SIZING IS INDICATED BY THE FOLLOWING SYMBOLS:
DETAIL
NUMBER
OPERATING
PRESSURE
HEAD
SPACING
WHERE IRRIGATION PRESSURE SUPPLY LINE IS SHOWN WITHIN
SIDEWALK OR PAVED AREA IT IS FOR DRAWING CLARITY. ACTUAL LOCATION TO BE OFFSET 18" BACK OF CURB, WALK OR HARDSCAPE.
DO NOT RUN ANY IRRIGATION MAINLINE OR LATERAL LINES
BENEATH TREE ROOTBALLS.
E
D
APPROVED
1" QUICK COUPLING VALVE
SCH 40 PVC
NIBCO
44-LRCRAINBIRD
G
APPROVED G
T-113 GATE VALVE (LINE SIZE)
2" & SMALLER PVC PRESSURE
SUPPLY LINE
SCH 40 PVC
w/ SCH 40 FITTINGS
1 1/2"
ELECTRIC CONTROL VALVE
SIZE PER PLAN)
PER DETAIL DRIP LINE FLUSH VALVE
XFF-TEE, XFF-ELBOWRAINBIRD SURFACE MOUNTED ELL, TEE
OR CROSS CONNECTION
RAINBIRD XFS-CV-06-18-XX (SHRUB)IN LINE EMITTER TUBING 18" O.C.
EMITTERS 18" O.C. ROW SPACING
ASDETAILEDASDETAILED PVC INTAKE/EXHAUST HEADER W/
XFF-MA-050 ADAPTER FITTINGS
RAINBIRD XCZ-100-COM DRIP VALVE ASSEMBLY
K
I, J
B
NOTES:
J
K
RAIN BIRD TUBING SHALL BE INSTALLED BELOW MULCH LAYER AS DETAILED. SUPPLY AND EXHAUST HEADERS SHALL BE INSTALLED BELOW GRADE AT DEPTHS SHOWN.
1. 2.
3. 4.
IN-LINE DRIP TUBING NOTES:
TUBING TO BE LAID DOWN SO THAT EMITTER OUTLETS ARE STAGGERED ON A TRIANGULAR SPACING PATTERN.
INSTALL RAIN BIRD "XFS DRIPLINE" TUBING AS SHOWN ON PLANS AND AS DESCRIBED BY CONSTRUCTION DETAILS.
SECURE TUBING AT A CONSISTENT ROW SPACING WITH RAIN BIRD #TDS-050 TIE-DOWN STAKE. NO GREATER THAN 36" ALONG LENGTH OF "XFS DRIPLINE" TUBING. USE TWO STAPLES IN AN 'X' PATTERN OVER ANY CHANGES IN DIRECTION OF RAIN BIRD TUBING.
1" MASTERVALVEGRISWOLD
CALSENSE
2000 SERIES
CS3000
APPROVED
M
OC
EXISTING
PVC LATERAL LINE (SIZE PER PLAN)
ALL LATERAL LINES EXTENDING FROM
DRIP VALVE ASSEMBLIES TO BE 3/4")
PVC IRRIGATION SLEEVE (SEE NOTE #5)
PVC IRRIGATION SLEEVE (SEE NOTE #6)
24 STATION WALL MOUNTED
CONTROLLER ASSEMBLY
4. 3.
2. 1.
1-2" SDR 35 PVC
REQUIRED SLEEVE(S)
1-4" SDR 35 PVC
1-2" SDR 35 PVC
1-2" SDR 35 PVC
1-2" SDR 35 PVC
5. 1-20 CONTROL WIRES
1 1/4" PRESSURE SUPPLY LINE
PIPE SIZE OR WIRE QUANTITY
1" LATERAL
DRIP TUBING
3/4" LATERAL
AT THE POINT OF CONNECTION, SYSTEM HAS BEEN DESIGNED BASED ON MINIMUM STATIC WATER PRESSURE OF 60 PSI AT THE IRRIGATION STUB PROVIDED OFF THE BUILDING EXTERIOR .
CONTRACTOR SHALL FIELD VERIFY PRESSURE ON THE UPSTRAM SIDE BACKFLOW PREVENTER PRIOR
TO ORDERING MATERIALS OR STARTING ANY IRRIGATION INSTALLATION AND NOTIFY CONSULTANT OF ANY DIFFERENCE FROM STATED PRESSURE. IF CONTRACTOR FAILS TO NOTIFY CONSULTANT HE ASSUMES FULL RESPONSIBILITY FOR ANY SYSTEM ALTERATIONS AS DIRECTED BY THE CONSULTANT.
INSTALL 6" POP-UP SPRAY HEADS IN TURF AREAS. ADJUST ARC AND RADIUS OF MP-ROTATOR
NOZZLES TO PROVIDE HEAD TO HEAD COVERAGE AND PREVENT OVERSPRAY ONTO PAVED SURFACES.
REFER TO LANDSCAPE IMPROVEMENT STANDARDS AND IRRIGATION DETAILS FOR INSTALLATION PROCEDURES.
INSTALL IRRIGATION SLEEVES UNDER HARDSCAPE ELEMENTS PER THE FOLLOWING SCHEDULE:
1-2" SDR 35PVC1" PRESSURE SUPPLY LINE
CONTRACTOR TO FIELD VERIFY SIZE, LOCATION AND QUANTITY OF EXISTING STREET SLEEVES
INSTALLED UNDER STREET IMPROVEMENT PACKAGE PRIOR TO INSTALLATION OF IRRIGATION SYSTEM AND NOTIFY CONSULTANT OF ANY DIFFERENCES.
6. F 40PSIPROS-12-PRS40-CV
MP1000-90 & 360 NOZ.
12" POP-UP SPRAY HEAD
w/ MP ROTATOR SR SERIES NOZ.
HUNTER
1" FLOWSENSORCALSENSEFM2NF
T HHUNTERRZWS-SERIES-10-25-CV
APPROVED SCH 40 PVC PVC LATERAL LINE (TREE ONLY)
8' - 11'
7. 8.
CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE AND FULL IRRIGATION COVERAGE AT ALL NEW PLANTING AREAS.
9. CONTRACTOR SHALL ADJUST DRIP TUBING AND SPRAY HEADS AT ALL VERTICAL OBSTRUCTIONS SUCH AS POLES, UTILITY BOXES, ETC.
CONTRACTOR TO ARRANGE AND PAY FOR A 3RD PARTY IRRIGATION AUDIT AT COMPLETION OF
IRRIGATION INSTALLATION
DEEP WATERING BUBBLER
ASSEMBLY 2 PER TREE
APPROVED G1.5" & COPPER PRESSURE SUPPLY LINE
PRE-INSTALLED UNDER PAVING)
TYPE K COPPER
w/ COPPER FITTINGS
Aqua Commercial Irrigation
810 Los Vallecitos Blvd., Suite 204
San Marcos, CA 92078
Ph: (760)750-1900 Fax: (760)750-1999
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 223 of 357
40039528.14TCF1
40040527.47GFL1
40041527.61LIP1
40042528.
20LIP1
40043528.04GFL140044528.73TCF1
40045529.28TCF1
40046528.60GFL1
40047528.74LIP1
40048529.43LIP1
40049529.
26GFL140050529.93TCF1
40051530.47TCF1
40052529.77GFL1
40053529.92LIP1
40054530.75LIP1.PT
40055530.60GFL1.PT40056531.26TCF1.PT
40057531.62TCF1 CI1
40058530.85GFL1
40059531.11LIP140060531.
10DI1
40061530.79DI1
40062530.85DI1
40063531.17DI1.CS
40064531.21LIP1
40065531.67CI1
40066532.18CI1
40067532.
17TCF1 CI1
40068531.40GFL1
40069531.63LIP1
40070531.93LIP1.BC
40071531.83GFL1.BC40072532.47TCF1.BC
40073533.06TCF1
40074532.45GFL1
40075532.55LIP1
40076533.10LIP1
40077532.
96GFL140078533.60TCF1
40079533.87TCF1.PT
40080533.20GFL1.PT
40081533.35LIP1.PT
40082533.67TELPED
40083533.
73CLF1 CLF2
40084534.07CLF1.BC
40085533.36CLF1
40086532.
16CLF1
40087531.53CLF1
40089531.28CLF1
40090530.50CLF1
40091530.06CLF1.PT
40092529.91CLF1 GATE1
40093529.69CLF3 GATE1
40094529.
51CLF3.BC
40097529.
20CLF3
40098528.69CLF3
40100528.43STLT
40101528.40CLF3
40104528.56CLF3.PT
US
MAIL
40105528.24MAILBOX
40140527.80DI240141527.72DI2
40142527.71DI2
40143527.82DI2.CS
40144527.
84SDIN/-4.38FL CANT SEE SIZE
40145
527.75
SDOUT/-4.4FL CMP
40341528.81TSN
40342528.03POST/4iSQWOOD
40348529.
86ICV
40349530.09ICBX
40350529.91HOSEBIB
40351530.22GAS1/?/1.5iRSR
40359528.55POST/SDCOVERS
40360528.84SIGN1CL6iWOOD
40361529.03SIGN1CL6iWOOD
40362529.22TSN
40393529.
38TSN
40410529.
78SCO
40411529.
87SCO
PB 40412530.
08TSPB
40414530.29FF
40551529.29CVLT1
40552529.22CVLT1
40553529.
22CVLT1
40554529.36CVLT1.CS
40659531.68POST/4iSQWOD
40688530.62ACGB640689530.57ACGB6
40690530.66ACGB6
40691530.67ACGB6
40692530.
86ACGB6
40693530.
85ACGB6.CS
40696530.25DI8
40697530.25DI840698530.29DI8
40699530.
28DI8.CS
40700530.27SDMH
40707530.26POST/SDCOVERS
40710530.13POST/4iSQWOOD
40711
530.29
SDOUT/-1.45FL10iSQCONC
40721529.23DI11
40722529.22DI11
40723529.22DI1140724529.22
DI11.CS
40770533.50RETWAL1/EF10iKEYSTONE
40801535.73CLF2
40802535.
47CLF2
40803535.13CLF2
40804533.
28KRAIL1/TOP CL
40805533.
39KRAIL1/TOP CL
40808533.36RETWAL1
40810534.
52CLF2
40811534.20CLF2
40813533.
38RETWAL1
40814533.40RETWAL1
40815533.38RETWAL1/TW
40822530.
64TCF5
40823530.65TCF5
40824530.87TCF5
40825531.06TCF5
40833530.20POST/5iSQWOOD
40834530.17POST/5iSQWOOD
40835530.
15POST/5iSQWOOD
40836530.
06POST/5iSQWOOD
40837529.84POST/5iSQWOOD
40838529.
89POST/5iSQWOOD
40839530.65BOH240840530.08BOH2
40841530.12SDMH/COVERED
40856529.84ACGB16 40857530.02ACGB15
40859529.73WALL1/SF8iCONC
40860529.84WALL1
40871529.48VD1
40873529.
44VD2
40874529.
44VD2
40875529.
47VD2 40876529.
41DI25
40877529.41DI25
40878529.
41DI2540879529.
43DI25.CS
40881529.42SDOUT/-1.40FL6iPVC
40882529.41SDOUT/-1.40FL6iPVC
40883529.58VD1
40885529.57VD2
40886529.72VD2
40888529.70VD1
40889529.54VD1
40891529.54VD2
40892529.44VD2
40894529.
44VD1
40895529.
28VD1
40897529.27VD2
40898529.09VD2
40900529.10VD1 VD2
40901529.
19SCO
40964529.97WVLV
X
A
X
40039528.14TCF1
40040527.47GFL1
40041527.61LIP1
40042528.
20LIP1
40043528.04GFL140044528.73TCF1
40045529.28TCF1
40046528.60GFL1
40047528.74LIP1
40048529.43LIP1
40049529.
26GFL140050529.93TCF1
40051530.47TCF1
40052529.77GFL1
40053529.92LIP1
40054530.75LIP1.PT
40055530.60GFL1.PT40056531.26TCF1.PT
40057531.62TCF1CI1
40058530.85GFL1
40059531.11LIP140060531.
10DI1
40061530.79DI1
40062530.85DI1
40063531.17DI1.CS
40064531.21LIP1
40065531.67CI1
40066532.18CI1
40067532.
17TCF1 CI1
40068531.40GFL1
40069531.63LIP1
40070531.93LIP1.BC
40071531.83GFL1.BC40072532.47TCF1.BC
40073533.06TCF1
40074532.45GFL1
40075532.55LIP1
40076533.10LIP1
40077532.
96GFL140078533.60TCF1
40079533.87TCF1.PT
40080533.20GFL1.PT
40081533.35LIP1.PT
40082533.67TELPED
40083533.
73CLF1 CLF2
40084534.07CLF1.BC
40085533.36CLF1
40086532.
16CLF1
40087531.53CLF1
40089531.28CLF1
40090530.50CLF1
40091530.06CLF1.PT
40092529.91CLF1 GATE1
40093529.69CLF3 GATE1
40094529.
51CLF3.BC
40097529.
20CLF3
40098528.69CLF3
40100528.43STLT
40101528.40CLF3
40104528.56CLF3.PT
US
MAIL
40105528.24MAILBOX
40140527.80DI240141527.72DI2
40142527.71DI2
40143527.82DI2.CS
40144527.
84SDIN/-4.38FL CANT SEE SIZE
40145
527.75
SDOUT/-4.4FL CMP
40341528.81TSN
40342528.03POST/4iSQWOOD
40348529.
86ICV
40349530.09ICBX
40350529.91HOSEBIB
40351530.22GAS1/?/1.5iRSR
40359528.55POST/SDCOVERS
40360528.84SIGN1CL6iWOOD
40361529.03SIGN1CL6iWOOD
40362529.22TSN
40393529.
38TSN
40410529.
78SCO
40411529.
87SCO
PB 40412530.
08TSPB
40414530.29FF
40551529.29CVLT1
40552529.22CVLT1
40553529.
22CVLT1
40554529.36CVLT1.CS
40659531.68POST/4iSQWOD
40688530.62ACGB640689530.57ACGB6
40690530.66ACGB6
40691530.67ACGB6
40692530.
86ACGB6
40693530.
85ACGB6.CS
40696530.25DI8
40697530.25DI840698530.29DI8
40699530.
28DI8.CS
40700530.27SDMH
40707530.26POST/SDCOVERS
40710530.13POST/4iSQWOOD
40711
530.29
SDOUT/-1.45FL10iSQCONC
40721529.23DI11
40722529.22DI11
40723529.22DI1140724529.22
DI11.CS
40770533.50RETWAL1/EF10iKEYSTONE
40801535.73CLF2
40802535.
47CLF2
40803535.13CLF2
40804533.
28KRAIL1/TOP CL
40805533.
39KRAIL1/TOP CL
40808533.36RETWAL1
40810534.
52CLF2
40811534.20CLF2
40813533.
38RETWAL1
40814533.40RETWAL1
40815533.38RETWAL1/TW
40822530.
64TCF5
40823530.65TCF5
40824530.87TCF5
40825531.06TCF5
40833530.20POST/5iSQWOOD
40834530.17POST/5iSQWOOD
40835530.
15POST/5iSQWOOD
40836530.
06POST/5iSQWOOD
40837529.84POST/5iSQWOOD
40838529.
89POST/5iSQWOOD
40839530.65BOH240840530.08BOH2
40841530.12SDMH/COVERED
40856529.84ACGB16 40857530.02ACGB15
40859529.73WALL1/SF8iCONC
40860529.84WALL1
40871529.48VD1
40873529.
44VD2
40874529.
44VD2
40875529.
47VD2 40876529.
41DI25
40877529.41DI25
40878529.
41DI2540879529.
43DI25.CS
40881529.42SDOUT/-1.40FL6iPVC
40882529.41SDOUT/-1.40FL6iPVC
40883529.58VD1
40885529.57VD2
40886529.72VD2
40888529.70VD1
40889529.54VD1
40891529.54VD2
40892529.44VD2
40894529.
44VD1
40895529.
28VD1
40897529.27VD2
40898529.09VD2
40900529.10VD1VD2
40901529.
19SCO
40964529.97WVLV
X
A
X
F
C
T
T
T
T
T
T
T
T
T
A
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619. 698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
668(' FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619. 992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR / ACI
ASR / ACI
LANDSCAPE
IRRIGATION
PLAN
LI-2
WHERE IRRIGATION PRESSURE SUPPLY LINE IS SHOWN WITHIN
SIDEWALK OR PAVED AREA IT IS FOR DRAWING CLARITY. ACTUAL LOCATION TO BE OFFSET 18" BACK OF CURB, WALK OR HARDSCAPE.
DO NOT RUN ANY IRRIGATION MAINLINE OR LATERAL LINES
BENEATH TREE ROOTBALLS.
Aqua Commercial Irrigation
810 Los Vallecitos Blvd., Suite 204
San Marcos, CA 92078
Ph: (760)750-1900 Fax: (760)750-1999
2"1 1/4"
1"
3/4"
LATERAL PIPE SIZING IS INDICATED BY THE FOLLOWING SYMBOLS:
1 1/2"
GRAPHIC SCALE: 1" = 20'
20'10' 0'20'40'
S
W E
N
1 "41
1 "41
1 "41
1 "41
1 "41
1 "41
8 1"
1 TREE
9 1"
4 S-DRIP
7 1"
5 S-DRIP
3 1"
4 S-DRIP
2 1"
1 TREE
1 "41
1 1"
1 S-DRIP
1"
1"
1"
1"
1 "41
5 1"
4 S-DRIP
6 1"
3 SHRUB
1"1"
1"4
1"
4 S-DRIP
3/4" IRRIGATION DRIP LATERALS TO BE
INSTALLED PRIOR TO THE INSTALLATION
OF THE HARDSCAPE AROUND BUILDING.
3/4" IRRIGATION DRIP LATERALS TO BE
INSTALLED PRIOR TO THE INSTALLATION
OF THE HARDSCAPE AROUND BUILDING.
3/4" IRRIGATION DRIP LATERALS TO BE
INSTALLED PRIOR TO THE INSTALLATION
OF THE HARDSCAPE AROUND BUILDING.
1.25" PRESSURE SUPPLY LINE, CONTROL AND COMMON
WIRES TO BE INSTALLED WITHIN FENCED AREA WHERE
THERE IS NO AREA BETWEEN FENCE AND SIDEWALK.
3 1
1 2
4 1
1 4
1 CONTROLLER
INSTALL ONE (1) CALSENSE CS3-24/CS3-GR/GR-STUBBY/COMM-5YR 24 STATION PEDESTAL MOUNT CONTROLLER ON CONCRETE PAD AS DETAILED. 120 VOLT ELECTRICAL SERVICE TO BE PROVIDED FROM ELECTRICAL PULL BOX WITHIN 50' OF FIELD SATELLITE UNIT. CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL CONNECTION TO CONTROLLERS. CONTRACTOR ALSO RESPONSIBLE FOR CONNECTION OF FLOW SENSOR CABLE FROM P.O.C TO CONTROLLER. FINAL LOCATION OF CONTROLLER IS TO BE APPROVED BY OWNERS REPRESENTATIVE.
INSTALL 14 AWG IN CONDUIT BETWEEN THE FLOW METER AND THE CONTROLLER.
POINT OF CONNECTION
LOCATE AND CONNECT TO THE EXISTING IRRIGATION SUPPLY LINE STUB IN THIS APPROXIMATE LOCATION AND INSTALL MASTER VALVE AND FLOW SENSOR AS DETAILED.
CONTINUE EXTENSION OF PRESSURE SUPPLY LINE TO IRRIGATION SYSTEM AS SHOWN. 3/4" IRRIGATION DRIP LATERALS TO BE
INSTALLED PRIOR TO THE INSTALLATION
OF THE HARDSCAPE AROUND BUILDING.
1" COPPER PRESSURE SUPPLY TO
BE PRE-INSTALLED UNDER PAVING
TO SHRUB AREA WHERE SHOWN.
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 224 of 357
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619. 698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
668('FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619. 992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR / ACI
ASR / ACI
LANDSCAPE
IRRIGATION
DETAILS
AND NOTES
LI-3
I
IN-LINE DRIP TUBING LAYOUT N.T.S.
SECTION
H
TREE IRRIGATION-SUPPLEMENTAL N.T.S.
SECTION
RAIN BIRD XFF-MA-050 ADAPTER FITTING
RAIN BIRD TUBING TO PVC FITTING)
WALK OR CURB
3/4" END PIPE HEADER
DRIP VALVE ASSEMBLY
SEE DETAILS B &C SHEET LI-3)RAINBIRD XFS-CV-06-18-XXX IN-LINE EMITTER TUBING EMITTERS AT 18" INTERVALS (SHRUB)
LINE FLUSHING VALVE
SEE DETAIL #L THIS SHEET)
1" PVC SCH 40 SUPPLY HEADER
18" TUBE SPACING (SHRUB)
12" TUBE SPACINF (TURF).
CONTINUATION OF SYSTEM
INSTALL TUBING 4" FROM CURB OR
WALK
18" TYP. SHRUB
PVC EXHAUST HEADER ASSEMBLY &
FITTINGS
6"
RAINBIRD XFF-TEE OR XFF-ELBOW FOR SURFACE MOUNTED CONNECTIONS
CURB, WALK, WALL OR EDGE OF PLANTING AREA
8"
4"
12"
AMENDED SOIL
3/4" X 1/2" X 3/4", S x S x T
PVC SCH 40 TEE OR ELL
RAINBIRD XFS-CV-06-18-XXX IN-LINE
EMITTER TUBING EMITTERS AT 18"
INTERVALS
RAINBIRD XFF-MA-050 ADAPTER -
FITTING (RAINBIRD TUBING TO PVC
FITTING)
FINISH
GRADE
1/2" PVC SCH 40 SUPPLY RISER
TRENCH FOR SUPPLY &
EXHAUST HEADERS
3/4" PVC SCH 40 SUPPLY
OR EXAUST HEADER
1/2" SCH 40 FPT TEE (TYPICAL)
TRENCH
BOTTOM
J
IN-LINE DRIP HEADER MANIFOLD N.T.S.
SECTION K
DRIP FLUSH VALVE N.T.S.
SECTION
ELEVATION
PLAN
3"
FINISH GRADE
INSERTxMIP 90 ELL
1/2" PVC BALL VALVE (FxF)
MIPxFIP SCH. 40 PVC 90 ELL
SCH. 80 PVC NIPPLE- 1/2" x 6"
FIPxFIP SCH. 40 PVC 90 ELL
3/4" CRUSHED GRAVEL SUMP (1 CU. FT.)
PVC PIPING TO IN-LINE DRIP HEADER
MANIFOLD OR POLYTUBING AT END OF
POINT SOURCE DRIP SYSTEMS
18"x\" I.D. EXCALIBER IRR. FLEX HOSE THIN
WALLED
INSERT x MIP 90 ELL
10" VALVE BOX TO REST
ON GRAVEL SUMP.
PVC PIPING TO IN-LINE DRIP HEADER
MANIFOLD OR POLYTUBING AT END OF
POINT SOURCE DRIP SYSTEMS
CHECK VALVE
FINISH SOIL GRADE
GRATED CAP
BUBBLER
SWING JOINT
ASSEMBLY (PART OF
DEEP ROOT WATERING
ASSEMBLY
LATERAL; TEE OR
ELL/PIPE SCH. 40 PVC.
DEEP ROOT WATERING
SYSTEM ASSEMBLY
WITH SWING JOINT.
ROOTBALL
LATERAL PIPING
PLAN
PLANTING PIT
HUNTER
RZWS-10-25-CV 10"DEEP
ROOT WATERING SYSTEM
ASSEMBLY WITH SWING
JOINT.
1/2" SCH 40 PVC
LATERAL PIPE.
1/2" SCH 40 S x T ELL
FITTING
HUNTER RZWS-10-25-CV
10"DEEP ROOT WATERING
SYSTEM ASSEMBLY WITH
SWING JOINT.
PURPLE
12" TYP. TURF
18" TYP. SHRUB
12" TYP. TURF
RAINBIRD XFS-06-12-XXX IN-LINE EMITTER
TUBING EMITTERS AT 12" INTERVALS (TURF)
TUBING SHALL BE STAPLED TO THE SOIL SURFACE 3' O.C. ALONG EACH TUBING LENGTH WITH RAIN BIRD TDS-050 BEND GALVANIZED TIE-DOWN STAKES.
NOTES:
TUBING SHALL BE INSTALLED FOR SUBSURFACE TURF APPLICATIONS SUCH THAT TOP OF TUBING IS 4" DEEP.
TURF WILL REQUIRE HAND SURFACE WATERING UNTIL ESTABLISHED.
1. 2.
3. 10" ROUND VALVE BOX BRAND "BO" ON LID OF
VALVE BOX. REFER TO TECHNICAL SPECS.
A
CONTROL VALVE N.T.S.
SECTION
PRESSURE SUPPLY LINE (PURPLE)
STAINLESS STEEL CLAMP (2)
LOCKING RUBBER CAP
FINISH GRADE
QUICK COUPLING VALVE
3" MAX.
2" MIN.
10" ROUND VALVE BOX BRAND "QC" INTO VALVE
BOX LID. REFER TO TECHNICAL SPECIFICATIONS.
VALVE BOX TO REST ON GRAVEL SUMP.
SPEARS PRE-ASSEMBLED 1" SWING JOINT
RISER ASSEMBLY MODEL NUMBER
5807-01010 MIPT INLET x MIPT OUTLET
1/2" x 36" GALVANIZED STEEL
SUPPORT PIPE
3/4" SCREENED GRAVEL
SUMP - 1 CU. FT.
1" SCH.80 PVC NIPPLE LENGTH AS
REQUIRED
1" SCH. 40 PVC PIPE, LENGTH AS REQUIRED
3/4" PVC LATERAL DRIP HEADER LINE
STANDARD RECTANGULAR VALVE BOX W/
LOCKING LID. BRAND CONTROLLER
STATION NUMBER ON VALVE BOX LID.
REFER TO TECHNICAL SPECIFICATIONS .
VALVE BOX TO REST ON GRAVEL SUMP.
RAIN BIRD XCZ-PBR-100-COM CONTROL ZONE
KIT INCLUDES BALL VALVE, CONTROL VALVE,
AND PRESSURE REGULATING BASKET FILTER
1" FPT x SLIP COUPLING W/ 1" X 3/4" SLIP
REDUCER
1" STREET 90° SxT SCH 40
3/4" SCREENED GRAVEL SUMP - 2 CU. FT.
APPROVED GEOTEXTILE FILTER FABRIC.
EXTEND 10" UP VALVE BOX EXTERIOR
WALLS - ALL SIDES.
PVC SERVICE TEE
PVC PRESSURE SUPPLY LINE (PURPLE)
SERVICE TEE - SOLVENT WELD OR
GASKETED FITTING. REFER TO
TECHNICAL SPECIFICATIONS
NOTE:
VALVE INSTALL ASSEMBLY TO REST ON GRAVEL SUMP. SUMP TO BE LINED WITH ONE CONTINUOUS PIECE OF GEOTEXTILE FILTER FABRIC EXTENDING FABRIC 10" UP ALL EXTERIOR SIDES OF VALVE BOX. VALVE BOX TO BE SET FLUSH WITH FINISH GRADE. VALVE ASSEMBLY TO BE CONTAINED AND CENTERED WITHIN VALVE BOX. NO PART OF ASSEMBLY TO CONTACT BOX LID. DO NOT CUT BOX.
PROVIDE 12" DIAMETER LOOP (MIN.) OF SPARE WIRES FROM CONTROLLER INSIDE EACH VALVE BOX.
VALVE BOXES TO BE SPACED EVENLY FROM WALK OR CURB AND FROM EACH OTHER. 3/4" SCH. 40 PVC PIPE, LENGTH AS REQUIRED
3/4" PVC LATERAL DRIP HEADER LINE
RAIN BIRD XCZ-075-PRF CONTROL ZONE
KIT INCLUDES CONTROL VALVE, AND
PRESSURE REGULATING Y FILTER
3/4" FPT x SLIP COUPLING
3/4" STREET 90° SxT SCH 40
3/4" SCREENED GRAVEL SUMP - 2 CU. FT.
APPROVED GEOTEXTILE FILTER FABRIC.
EXTEND 10" UP VALVE BOX EXTERIOR
WALLS - ALL SIDES.
PVC SERVICE TEE
PVC PRESSURE SUPPLY LINE (PURPLE)
3/4" SPEARS PVC SCH. 80 BALL VALVE
NOTE: DIAMETERS OF RISER, FITTINGS, BALL VALVE AND NIPPLE SHALL EQUAL CONTROL VALVE DIAMETER.
PVC SERVICE TEE
APPROVED GEOTEXTILE FILTER FABRIC. EXTEND
10" UP VALVE BOX EXTERIOR WALLS - ALL SIDES.
PVC PRESSURE SUPPLY LINE (PURPLE)
SCH. 40 PVC PIPE, LENGTH AS REQUIRED
3/4" SCREENED GRAVEL SUMP - 2 CU. FT.
ELECTRIC CONTROL VALVE
SCH. 40 PVC 90 ELL SLIP X SLIP
VALVE SIZE X CLOSE SCH. 80 PVC NIPPLE (TYPICAL).
SPEARS PVC BALL VALVE
FINISH GRADE
PVC LATERAL - 45 ELL TO 12" DEPTH
B
DRIP VALVE (LOW FLOW)
3 GPM & LESS
N.T.S.
SECTION C
DRIP VALVE (MED. FLOW)
GREATER THAN 3 GPM
N.T.S.
SECTION D
GATE VALVE N.T.S.
SECTION
3"
4"
FINISH GRADE
10" ROUND VALVE BOX
BRAND "GV" ON LID OF
VALVE BOX. REFER TO TECHNICAL SPECS.
VALVE BOX TO REST ON GRAVEL SUMP.
6" CLASS 160PVC SLEEVE BOTTOM TO BE
FLARED AND CONTACT TOP OF PRESSURE
SUPPLY LINE
SLIPxMIPT SCH.40 PVC ADAPTER (2)
GATE VALVE W/BRASS CROSS HANDLE
PVC PRESSURE SUPPLY LINE (PURPLE)
VALVE INSTALL ASSEMBLY TO REST ON GRAVEL SUMP. SUMP TO BE LINED WITH ONE CONTINUOUS PIECE OF GEOTEXTILE FILTER FABRIC EXTENDING FABRIC 10" UP ALL EXTERIOR SIDES OF VALVE BOX. VALVE BOX TO BE SET FLUSH WITH FINISH GRADE. VALVE ASSEMBLY TO BE CONTAINED AND CENTERED WITHIN VALVE BOX. NO PART OF ASSEMBLY TO CONTACT BOX LID. DO NOT CUT BOX.
PROVIDE 12" DIAMETER LOOP (MIN.) OF SPARE WIRES FROM CONTROLLER INSIDE EACH VALVE BOX.
VALVE BOXES TO BE SPACED EVENLY FROM WALK OR CURB AND FROM EACH OTHER.
NOTE:
VALVE INSTALL ASSEMBLY TO REST ON GRAVEL SUMP. SUMP TO BE LINED WITH ONE CONTINUOUS PIECE OF GEOTEXTILE FILTER FABRIC EXTENDING FABRIC 10" UP ALL EXTERIOR SIDES OF VALVE BOX. VALVE BOX TO BE SET FLUSH WITH FINISH GRADE. VALVE ASSEMBLY TO BE CONTAINED AND CENTERED WITHIN VALVE BOX. NO PART OF ASSEMBLY TO CONTACT BOX LID. DO NOT CUT BOX.
PROVIDE 12" DIAMETER LOOP (MIN.) OF SPARE WIRES FROM CONTROLLER INSIDE EACH VALVE BOX.
VALVE BOXES TO BE SPACED EVENLY FROM WALK OR CURB AND FROM EACH OTHER. 3/4" SCREENED GRAVEL SUMP 1 CU. FT.
E
QUICK COUPLING VALVE N.T.S.
SECTION F
6" POP-UP SPRAY HEAD
3 GPM & LESS
N.T.S.
SECTION
HUNTER MP ROTATOR NOZZLE
USE TEFLON TAPE ON ALL THREADED CONNECTIONS UNLESS SPECIFICALLY INDICATED BY THE MANUFACTURER OF THE COMPONENT TO NOT USE TEFLON TAPE.
RAIN BIRD WC100 WIRE CONNECTOR.
2" MIN.
4" MAX.
CONTROL WIRES
RAIN BIRD WC100 WIRE CONNECTOR.
CONTROL WIRES
NOTE:
RAIN BIRD WC100 WIRE CONNECTOR.
CONTROL WIRES
STANDARD RECTANGULAR VALVE BOX W/
LOCKING LID. BRAND CONTROLLER
STATION NUMBER ON VALVE BOX LID.
REFER TO TECHNICAL SPECIFICATIONS .
VALVE BOX TO REST ON GRAVEL SUMP.
STANDARD RECTANGULAR VALVE BOX W/ LOCKING LID.
BRAND CONTROLLER STATION NUMBER ON VALVE BOX
LID. REFER TO TECHNICAL SPECIFICATIONS . VALVE
BOX TO REST ON GRAVEL SUMP.
L
DRIP TUBING AT EXISTING TREES
FOR EXISTING TREES ONLY WITHIN INLINE-DRIP TUBING LAYOUT N.T.S.
SECTION
EMITTER TUBING & FITTINGS
12"
12"
EXISTING TREE TRUNK
NOTE:
INSTALL EMITTER TUBING 12" AWAY FROM EXISTING TREE TRUNK.
Aqua Commercial Irrigation
810 Los Vallecitos Blvd., Suite 204
San Marcos, CA 92078
Ph: (760)750-1900 Fax: (760)750-1999
FINISHED GRADE
NOTES:
1. 2.
3. NATIVE SOIL AS APPROVED BACKFILL
W/ MINUS 1/4" MATERIAL
CONTROL WIRING BELOW PRESSURE
SUPPLY LINE
PRESSURE SUPPLY LINE
PVC LATERAL PIPING / POINT SOURCE
DRIP TUBING
ALL PLASTIC PIPING TO BE SNAKED IN TRENCHES
BUNDLE AND TAPE WIRING AT 10' INTERVALS.
INSTALL ALL CONTROL AND COMMON WIRING TO THE
SIDE AND BELOW THE PRESSURE SUPPLY LINE.
G
TRENCHING N.T.S.
SECTION
18"
MIN.
12"
MIN.
6"
MIN.
4.WHERE PIPING AND CONTROLL WIRE OCCURS BENEATH
PAVING, SLEEVING SHALL BE AT SAME DEPTH AS
SHOWN IN DETAIL
CURB AND GUTTER OR SIDEWALK
SET BOTTOM OF CAP AT GRADE
WHERE APPLICABLE
12" HI-POP SPRAY HEAD
LOCATE 6" AWAY FROM WALLS AND
OTHER VERTICAL SURFACES.
6"
1/2" X 8" SCH.80 PVC NIPPLE
1/2" MIPxFIP MARLEX 90 ELL (2)
1/2" X 4" SCH.80 PVC NIPPLE
1/2" MIPxFIP MARLEX 90 ELL
SOLVENT WELD SCH.40 PVC FITTING
PVC LATERAL - RECYCLED PURPLE
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 225 of 357
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619. 698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
668(' FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619. 992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR / ACI
ASR / ACI
LANDSCAPE
IRRIGATION
DETAILS
AND NOTES
LI-4
FINISH GRADE
RECTANGULAR VALVE BOX WITH
EXTENSION - BRAND "MV" INTO
VALVE BOX LID. REFER TO
TECHNICAL SPECIFICATIONS.
SLIPxMIPT SCH. 40 PVC ADAPTER (2)
APPROVED GEOTEXTILE FILTER
FABRIC
PRESSURE SUPPLY LINE
3/4" SCREENED GRAVEL SUMP
2 CU. FT.
ELECTRIC CONTROL VALVE
M
MASTER VALVE N.T.S.
SECTION N
FLOW SENSOR N.T.S.
SECTION
RAIN BIRD WC100 WIRE CONNECTOR.
CONTROLWIRES18"
MAX.
STANDARD RECTANGULER VALVE
BOX WITH EXTENSIONS - BRAND "FS"
INTO VALVE BOX LID. REFER TO
TECHNICAL SPECIFICATIONS.
UPSTREAM
10 x PIPE DIA. MIN.
TO MASTER VALVE TO IRRIGATION SYSTEM
DOWNSTREAM
5 x PIPE DIA. MIN.
FLOW
DIRECTION CHANGE
NO FITTINGSORNOFITTINGSOR
DIRECTION CHANGE
FINISH GRADE
SLIPxMIPT SCH. 40 PVC ADAPTOR (2)
3/4" SCREENED GRAVEL SUMP 2 CU. FT.
FLOW SENSOR (SEE IRRIGATION
SCHEDULE)
2) 14 GAUGE CONTROL WIRES FROM
FLOW SENSOR LEADS TO CONTROLLER
REFER TO PLANS FOR LOCATION.
WATER PROOF WIRE CONNECTORS -
3M SHOTCHLOK # 3570
APPROVED GEOTEXTILE FILTER FABRIC.
EXTEND 10" UP VALVE BOX EXTERIOR WALLS
ALL SIDES AND FOLD 2" OVER.
O
CONTROLLER ASSEMBLY N.T.S.
SECTION
Aqua Commercial Irrigation
810 Los Vallecitos Blvd., Suite 204
San Marcos, CA 92078
Ph: (760)750-1900 Fax: (760)750-1999
STAINLESS STEEL FLIP TOP
LID, SHOWN IN OPEN
POSITION
STAINLESS STEEL TOP-ENTRY
CONTROLLER ENCLOSURE NEMA 3R
RAINPROOF RATED W/ DOME
ANTENNA
TP-1 TRANSIENT PROTECTION BOARD
W/ TERMINALS FOR VALVE WIRES.
CALSENSE TP-110
SURGE ARRESTOR
POWER SWITCH AND RECEPTACLE
CONTROLLER, ENCLOSURE AND ALL
OF THE REQUIRED COMPONENTS
SHALL BE PART OF A PRE-ASSEMBLED
CONTROLLER ASSEMBLY
STAINLESS STEEL, U.L. LISTED,
PREDRILLED, REMOVABLE BACKBOARD
TERMINAL BLOCKS FOR
COMMUNICATION CABLE
6 SOLID COPPER GROUND WIRE
CONNECT TO GRD. TERMINAL
1 1/4" PVC CONDUIT/SWEEP
FOR ELECTRICAL SERVICE
TWO (2) 2" PVC CONDUITS FOR
CONTROL WIRES TO VALVES
5/8" DIA. x 8' COPPER GROUND ROD
W/#10 GROUND WIRE AND BRONZE
CLAMP W/IN PVC SLEEVE THRU SLAB
1" PVC CONDUIT/SWEEP FOR FLOW
SENSOR/MCV WIRES
120 VAC JUNCTION BOX
NOTES:
CS3000 CONTROLLER
POURED CONCRETE PAD
24" x 26" x 8" DEEP SLOPE
EDGES TO DRAIN
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 226 of 357
40039528.14TCF1
40040527.47GFL1
40041527.61LIP1
40042528.
20LIP1
40043528.04GFL140044528.73TCF1
40045529.28TCF1
40046528.60GFL1
40047528.74LIP1
40048529.43LIP1
40049529.
26GFL140050529.93TCF1
40051530.47TCF1
40052529.77GFL1
40053529.92LIP1
40054530.75LIP1.PT
40055530.60GFL1.PT40056531.26TCF1.PT
40057531.62TCF1 CI1
40058530.85GFL1
40059531.11LIP140060531.
10DI1
40061530.79DI1
40062530.85DI1
40063531.17DI1.CS
40064531.21LIP1
40065531.67CI1
40066532.18CI1
40067532.
17TCF1 CI1
40068531.40GFL1
40069531.63LIP1
40070531.93LIP1.BC
40071531.83GFL1.BC40072532.47TCF1.BC
40073533.06TCF1
40074532.45GFL1
40075532.55LIP1
40076533.10LIP1
40077532.
96GFL140078533.60TCF1
40079533.87TCF1.PT
40080533.20GFL1.PT
40081533.35LIP1.PT
40082533.67TELPED
40083533.
73CLF1 CLF2
40084534.07CLF1.BC
40085533.36CLF1
40086532.
16CLF1
40087531.53CLF1
40089531.28CLF1
40090530.50CLF1
40091530.06CLF1.PT
40092529.91CLF1 GATE1
40093529.69CLF3 GATE1
40094529.
51CLF3.BC
40097529.
20CLF3
40098528.69CLF3
40100528.43STLT
40101528.40CLF3
40104528.56CLF3.PT
US
MAIL
40105528.24MAILBOX
40140527.80DI240141527.72DI2
40142527.71DI2
40143527.82DI2.CS
40144527.
84SDIN/-4.38FL CANT SEE SIZE
40145
527.75
SDOUT/-4.4FL CMP
40341528.81TSN
40342528.03POST/4iSQWOOD
40348529.
86ICV
40349530.09ICBX
40350529.91HOSEBIB
40351530.22GAS1/?/1.5iRSR
40359528.55POST/SDCOVERS
40360528.84SIGN1CL6iWOOD
40361529.03SIGN1CL6iWOOD
40362529.22TSN
40393529.
38TSN
40410529.
78SCO
40411529.
87SCO
PB 40412530.
08TSPB
40414530.29FF
40551529.29CVLT1
40552529.22CVLT1
40553529.
22CVLT1
40554529.36CVLT1.CS
40659531.68POST/4iSQWOD
40688530.62ACGB640689530.57ACGB6
40690530.66ACGB6
40691530.67ACGB6
40692530.
86ACGB6
40693530.
85ACGB6.CS
40696530.25DI8
40697530.25DI840698530.29DI8
40699530.
28DI8.CS
40700530.27SDMH
40707530.26POST/SDCOVERS
40710530.13POST/4iSQWOOD
40711
530.29
SDOUT/-1.45FL10iSQCONC
40721529.23DI11
40722529.22DI11
40723529.22DI1140724529.22
DI11.CS
40770533.50RETWAL1/EF10iKEYSTONE
40801535.73CLF2
40802535.
47CLF2
40803535.13CLF2
40804533.
28KRAIL1/TOP CL
40805533.
39KRAIL1/TOP CL
40808533.36RETWAL1
40810534.
52CLF2
40811534.20CLF2
40813533.
38RETWAL1
40814533.40RETWAL1
40815533.38RETWAL1/TW
40822530.
64TCF5
40823530.65TCF5
40824530.87TCF5
40825531.06TCF5
40833530.20POST/5iSQWOOD
40834530.17POST/5iSQWOOD
40835530.
15POST/5iSQWOOD
40836530.
06POST/5iSQWOOD
40837529.84POST/5iSQWOOD
40838529.
89POST/5iSQWOOD
40839530.65BOH240840530.08BOH2
40841530.12SDMH/COVERED
40856529.84ACGB16 40857530.02ACGB15
40859529.73WALL1/SF8iCONC
40860529.84WALL1
40871529.48VD1
40873529.
44VD2
40874529.
44VD2
40875529.
47VD2 40876529.
41DI25
40877529.41DI25
40878529.
41DI2540879529.
43DI25.CS
40881529.42SDOUT/-1.40FL6iPVC
40882529.41SDOUT/-1.40FL6iPVC
40883529.58VD1
40885529.57VD2
40886529.72VD2
40888529.70VD1
40889529.54VD1
40891529.54VD2
40892529.44VD2
40894529.
44VD1
40895529.
28VD1
40897529.27VD2
40898529.09VD2
40900529.10VD1 VD2
40901529.
19SCO
40964529.97WVLV
X
A
X
40039528.14TCF1
40040527.47GFL1
40041527.61LIP1
40042528.
20LIP1
40043528.04GFL140044528.73TCF1
40045529.28TCF1
40046528.60GFL1
40047528.74LIP1
40048529.43LIP1
40049529.
26GFL140050529.93TCF1
40051530.47TCF1
40052529.77GFL1
40053529.92LIP1
40054530.75LIP1.PT
40055530.60GFL1.PT40056531.26TCF1.PT
40057531.62TCF1CI1
40058530.85GFL1
40059531.11LIP140060531.
10DI1
40061530.79DI1
40062530.85DI1
40063531.17DI1.CS
40064531.21LIP1
40065531.67CI1
40066532.18CI1
40067532.
17TCF1 CI1
40068531.40GFL1
40069531.63LIP1
40070531.93LIP1.BC
40071531.83GFL1.BC40072532.47TCF1.BC
40073533.06TCF1
40074532.45GFL1
40075532.55LIP1
40076533.10LIP1
40077532.
96GFL140078533.60TCF1
40079533.87TCF1.PT
40080533.20GFL1.PT
40081533.35LIP1.PT
40082533.67TELPED
40083533.
73CLF1 CLF2
40084534.07CLF1.BC
40085533.36CLF1
40086532.
16CLF1
40087531.53CLF1
40089531.28CLF1
40090530.50CLF1
40091530.06CLF1.PT
40092529.91CLF1 GATE1
40093529.69CLF3 GATE1
40094529.
51CLF3.BC
40097529.
20CLF3
40098528.69CLF3
40100528.43STLT
40101528.40CLF3
40104528.56CLF3.PT
US
MAIL
40105528.24MAILBOX
40140527.80DI240141527.72DI2
40142527.71DI2
40143527.82DI2.CS
40144527.
84SDIN/-4.38FL CANT SEE SIZE
40145
527.75
SDOUT/-4.4FL CMP
40341528.81TSN
40342528.03POST/4iSQWOOD
40348529.
86ICV
40349530.09ICBX
40350529.91HOSEBIB
40351530.22GAS1/?/1.5iRSR
40359528.55POST/SDCOVERS
40360528.84SIGN1CL6iWOOD
40361529.03SIGN1CL6iWOOD
40362529.22TSN
40393529.
38TSN
40410529.
78SCO
40411529.
87SCO
PB 40412530.
08TSPB
40414530.29FF
40551529.29CVLT1
40552529.22CVLT1
40553529.
22CVLT1
40554529.36CVLT1.CS
40659531.68POST/4iSQWOD
40688530.62ACGB640689530.57ACGB6
40690530.66ACGB6
40691530.67ACGB6
40692530.
86ACGB6
40693530.
85ACGB6.CS
40696530.25DI8
40697530.25DI840698530.29DI8
40699530.
28DI8.CS
40700530.27SDMH
40707530.26POST/SDCOVERS
40710530.13POST/4iSQWOOD
40711
530.29
SDOUT/-1.45FL10iSQCONC
40721529.23DI11
40722529.22DI11
40723529.22DI1140724529.22
DI11.CS
40770533.50RETWAL1/EF10iKEYSTONE
40801535.73CLF2
40802535.
47CLF2
40803535.13CLF2
40804533.
28KRAIL1/TOP CL
40805533.
39KRAIL1/TOP CL
40808533.36RETWAL1
40810534.
52CLF2
40811534.20CLF2
40813533.
38RETWAL1
40814533.40RETWAL1
40815533.38RETWAL1/TW
40822530.
64TCF5
40823530.65TCF5
40824530.87TCF5
40825531.06TCF5
40833530.20POST/5iSQWOOD
40834530.17POST/5iSQWOOD
40835530.
15POST/5iSQWOOD
40836530.
06POST/5iSQWOOD
40837529.84POST/5iSQWOOD
40838529.
89POST/5iSQWOOD
40839530.65BOH240840530.08BOH2
40841530.12SDMH/COVERED
40856529.84ACGB16 40857530.02ACGB15
40859529.73WALL1/SF8iCONC
40860529.84WALL1
40871529.48VD1
40873529.
44VD2
40874529.
44VD2
40875529.
47VD2 40876529.
41DI25
40877529.41DI25
40878529.
41DI2540879529.
43DI25.CS
40881529.42SDOUT/-1.40FL6iPVC
40882529.41SDOUT/-1.40FL6iPVC
40883529.58VD1
40885529.57VD2
40886529.72VD2
40888529.70VD1
40889529.54VD1
40891529.54VD2
40892529.44VD2
40894529.
44VD1
40895529.
28VD1
40897529.27VD2
40898529.09VD2
40900529.10VD1VD2
40901529.
19SCO
40964529.97WVLV
X
A
XC
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619. 698.9177 | www.jeffkatzarchitecture.com
Sheet Title:
668(' FOR
CONSTRUCTION
PROJECT:
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
Description: Date:
PO BOX 1088, RANCHO SANTA FE, CA 92067
619. 992.8196 | www.asrla.com
LANDSCAPE ARCHITECTURE
A S R
ANDR
EW S R E
ESE
Project Number:
Drawn By:
Checked By:
Approved By:
19-014-01
ASR
ASR / ACI
ASR / ACI
HYDROZONE
IRRIGATION
PLAN
LI-5
WHERE IRRIGATION PRESSURE SUPPLY LINE IS SHOWN WITHIN
SIDEWALK OR PAVED AREA IT IS FOR DRAWING CLARITY. ACTUAL LOCATION TO BE OFFSET 18" BACK OF CURB, WALK OR HARDSCAPE.
DO NOT RUN ANY IRRIGATION MAINLINE OR LATERAL LINES
BENEATH TREE ROOTBALLS.
Aqua Commercial Irrigation
810 Los Vallecitos Blvd., Suite 204
San Marcos, CA 92078
Ph: (760)750-1900 Fax: (760)750-1999
2"1 1/4"
1"
3/4"
LATERAL PIPE SIZING IS INDICATED BY THE FOLLOWING SYMBOLS:
1 1/2"
GRAPHIC SCALE: 1" = 20'
20'10' 0'20'40'
S
W E
N
1"
HYDRO-ZONE 1
HYDRO-ZONE CHART
HYDRO-ZONE 4
HYDRO-ZONE 3
DRIP SHRUB LOW
BUBBLER TREE MODERATE
SPRAY SHRUB
HYDRO-ZONE 2 DRIP SHRUB MOD
ALTERNATE BID ITEM #2: ALL PLANTING AND PLANTING AREAS, INCLUDING ARTIFICIAL TURF.
ALTERNATE BID ITEM #4: AUTOMATIC IRRIGATION SYSTEM AFTER (DOWNSTREAM) FROM P.O.C. WITH THE FOLLOWING EXCEPTIONS; ALL SLEEVING FOR THE ENTIRE PROJECT AND
NEW MAINLINE EXTENSION / CONNECTION TO THE NEWLY PROPOSED P.O.C. ON THE PLANS. CONTRACTOR TO CAP MAINLINE AT P.O.C. BACKFLOW PREVENTER, ALL LATERAL AND DRIP LINES, CLOCKS ETC. DOWNSTREAM OF P.O.C.
SHALL BE INCLUDED AS PART OF THIS BID ALTERNATE ITEM #4.
ADDITIONAL BID ALTERNATES BY OTHERS - SEE OTHER PLANS FO.
LANDSCAPE BID ALTERNATE(s)
FOR
CONSTRUCTION
05/ 18/21
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
11/ 25/20
BID SET 02/ 11/21
11/10/2026 C6 227 of 357
DW
2 G
E
J J
F
H
3 C C
A A
98764
10 10
1 1
B
5 D
1918 SF
117
150
19 B
O
P
EN
W
O
R
K
ST
A
TIO
N
S
136 SF
121
150
1 B
O
FFIC
E
D
1 138 SF
120
150
1 B
O
FFIC
E
D
1 141 SF
119
150
1 B
O
FFIC
E
D
1 SERVER
118145SF
115
150
1 B
CO
P
Y
M
A
IL
RO
O
M
87 SF
116
150
1 B
RE
C
EIV
IN
G
193 SF
112
15 13
B
M
U
LTI
P
U
R
P
O
SE
464 SF
125
15 31
B
BR
EA
K
R
O
O
M
841 SF
130
50 17
B
M
EN
S
LO
C
K
E
R
ELECTRICAL
132
JAN
124
STORAGE
123
MEN'S
129
WASH ROOM
131
WOMEN'S
128
699 SF
126
50 15
B
FIT
N
ESS
145 SF
111
150
1 B
O
FFIC
E
D
1 168 SF
110
150
2 B
O
FFIC
E
C
1 169 SF
109
150
2 B
O
FFIC
E
C
1 169 SF
108
150
2 B
O
FFIC
E
C
1 228 SF
107
150
2 B
O
FFIC
E
B
335 SF
106
15 23
B
CO
N
FER
EN
C
E
HALL
102
59 SF
105
150
1 B
CO
P
Y 124 SF
100
15 9
B
LO
B
B
Y
154 SF
103
150
2 B
RE
C
EP
TIO
N
RESTROOM
101
RESTROOM
104
STORAGE
113
STORAGE
114
B
HALL
122
HWH
127
O.L. = 9 OCC
1.8" EXIT WIDTH REQUIRED
36" EXIT WIDTH PROVIDED
O.L. = 9 OCC
1.8" EXIT WIDTH REQUIRED
36" EXIT WIDTH PROVIDED
O.L. = 33 OCC
6.6" EXIT WIDTH REQUIRED
36" EXIT WIDTH PROVIDED
O.L. = 24 OCC
4.8" EXIT WIDTH REQUIRED
36" EXIT WIDTH PROVIDED
O.L. = 10 OCC
2.0" EXIT WIDTH REQUIRED
36" EXIT WIDTH PROVIDED
PH
PH PH
PH
PH
FE
FE
FR
133
PH
PH
PH
O.L. = 31 OCC
6.2" EXIT WIDTH REQUIRED
72" EXIT WIDTH PROVIDED
O.L. = 15 OCC
3.0" EXIT WIDTH REQUIRED
72" EXIT WIDTH PROVIDED
O.L. = 17 OCC
3.4" EXIT WIDTH REQUIRED
36" EXIT WIDTH PROVIDED
110 SF
134
150
1 B
O
FFIC
E
E1
111 SF
135
150
1 B
O
FFIC
E
E1
111 SF
136
150
1 B
O
FFIC
E
E1
111 SF
137
150
1 B
O
FFIC
E
E1
111 SF
138
150
1 B
O
FFIC
E
E1
111 SF
139
150
1 B
O
FFIC
E
E1
113 SF
140
150
1 B
O
FFIC
E
E1
FE
PH
TACTILE EXIT SIGN, SEE
D3/T-6
TACTILE EXIT SIGN, SEE
D3/T-6
TACTILE EXIT SIGN, SEE
D3/T-6
TACTILE EXIT SIGN,
SEE D3/T-6
TACTILE EXIT ROUTE SIGN,
SEE D3/T-6
TACTILE EXIT SIGN, SEE
D3/T-6
TACTILE EXIT SIGN, SEE
D3/T-6
TACTILE EXIT SIGN, SEE
D3/T-6
PH
TACTILE EXIT ROUTE
SIGN, SEE D3/T-6
PH
TACTILE EXIT SIGN, SEE
D3/T-6
O.L. = 3 OCC
0.6" EXIT WIDTH REQUIRED
36" EXIT WIDTH PROVIDED
2A:10B:C
EXTINGUISHER
IN SEMI-RECESSED
CABINET
4A:20B:C
EXTINGUISHER
MOUNTED ON WALL
2A:10B:C
EXTINGUISHER IN
SEMI-RECESSED
CABINET
1. GRADE LEVEL AREAS DESIGNATED AS EXIT DISCHARGE
COMPONENTS FOR A BUILDING SHALL BE PERMANENTLY
MAINTAINED. SUCH AREAS SHALL NOT BE DEVELOPED OR
OTHERWISE ALTERED IN THEIR CAPACITY TO PROVIDE
CONTINUOUS, UNOBSTRUCTED AND UNDIMINISHED MEANS
OF EGRESS FOR THE BUILDING OCCUPANTS. IF SUCH AREAS
ARE SOLD INDEPENDENT OF THE BUILDING THEY SERVE AN EXIT
DISCHARGE COMPLYING WITH THE REQUIREMENTS OF
SECTION 1006 SHALL BE PROVIDED FOR THE BUILDING.
2. EGRESS DOORS SHALL BE READILY OPENABLE FROM THE
EGRESS SIDE WITHOUT THE USE OF A KEY OR SPECIAL
KNOWLEDGE OR EFFORT.
3. ROOMS LISTED WITH NO OCCUPANT LOAD ARE CONSIDERED
ACCESSORY USES.
4. MAXIMUM EXIT ACCESS DISTANCE SHALL BE NO FURTHER
THAN 300FT.
5. ACCESSIBLE ROUTES REQUIRED SHALL COMPLY WITH EACH
OF THE FOLLOWING:
A. COINCIDE WITH OR BE LOCATED IN THE SAME AREA
AS GENERAL CIRCULATION PATHS.
B. LOCATED WITHIN BUILDING INTERIOR WHERE
GENERAL CIRCULATION PATHS ARE INTERIOR.
C. NOT PASS THROUGH KITCHENS, STORAGE ROOMS,
RESTROOMS, CLOSETS, OR SIMILAR SPACES UNLESS
SERVING THOSE SPACES.
PATH OF TRAVEL
ILLUMINATED EXIT SIGN, SEE ELECTRICAL
PANIC HARDWARE, SEE DOORSCHEDULEPH
ROOM #
OCC. CLASS
NET SQ. FT.
OCC. LOAD FACTOR
OCCUPANTS
xxx
xxx
xxx
xxx
xxx
FIREEXTINGUISHERFE
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
EGRESS PLAN
200102
A0.1
BC
JK
CS, KD, KG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/8" = 1'-0"A0.1
D1 EGRESS PLAN
ROOM
NUMBER ROOM NAME SQ. FT.
LOAD
FACTOR OCCUP CLASS
100 LOBBY 124 SF 15 9 B
101 RESTROOM 68 SF B
102 HALL 535 SF B
103 RECEPTION 154 SF 150 2 B
104 RESTROOM 62 SF B
105 COPY 59 SF B
106 CONFERENCE 335 SF 15 23 B
107 OFFICE B 228 SF 150 2 B
108 OFFICE C1 169 SF 150 2 B
109 OFFICE C1 169 SF 150 2 B
110 OFFICE C1 168 SF 150 2 B
111 OFFICE D1 145 SF 150 1 B
112 MULTI-PURPOSE 193 SF 15 13 B
113 STORAGE 23 SF B
114 STORAGE 70 SF B
115 COPY/MAIL ROOM 145 SF 150 1 B
116 RECEIVING 87 SF 150 1 B
117 OPEN WORK
STATIONS
1918 SF 150 13 B
118 SERVER 89 SF B
119 OFFICE D1 141 SF 150 1 B
120 OFFICE D1 138 SF 150 1 B
121 OFFICE D1 136 SF 150 1 B
122 HALL 323 SF B
123 STORAGE 26 SF B
124 JAN 42 SF B
125 BREAK ROOM 464 SF 15 31 B
126 FITNESS 699 SF 50 14 B
127 HWH 23 SF B
128 WOMEN'S 385 SF B
129 MEN'S 267 SF B
130 MEN'S LOCKER 841 SF 50 17 B
131 WASH ROOM 91 SF B
132 ELECTRICAL 64 SF B
133 FR 29 SF B
134 OFFICE E1 110 SF 150 1 B
135 OFFICE E1 111 SF 150 1 B
136 OFFICE E1 111 SF 150 1 B
137 OFFICE E1 111 SF 150 1 B
138 OFFICE E1 111 SF 150 1 B
139 OFFICE E1 111 SF 150 1 B
140 OFFICE E1 113 SF 150 1 B
9185 SF 147
OCCUPANCY LOAD CALC
TOTAL AREA N.S.F.
CORE AREA:
TOTAL AREA G.S.F.:
9,191 SF
833 SF
10,074 SF
143
EGRESS NOTES
EGRESS LEGEND
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 228 of 357
PB
PB40100528.43
STLT
BOLLARD
PB
40414
530.29
FF
40804533.
28KRAIL1/TOPCL
40805533.
39KRAIL1/TOPCL
US
MAIL
EXISTING
BUILDING
E TAYLOR
ST.
EXISTING ADMINISTRATION BUILDING
D01
D07
D09
D10
D03
D07
D09
D12D12
D13
TYP.
D14
D09
D11
TYP.
D15
D05
D06
D16
EXISTING BUILDING B EXISTING BUILDING F
D17
D18
D09
D20
TYP.
D21
TYP.
D23
D12
D24
D26
D12
D27
D24
D20
D28
D29
D16
D30
EXISTING ASPHALT PAVING TO BE
REMOVED, SEE CIVIL
PROPERTY LINE
EXISTING TO REMAIN
REMOVE EXISTING
EXISTING CONCRETE PAVING TO BE
REMOVED, SEE CIVIL
1. PERFORM ALL DEMOLITION SO THAT EXISTING CONSTRUCTION THAT WILL REMAIN IS UNDAMAGED.
2. EXTENT OF REMOVAL AS INDICATED IS APPROXIMATE.
CONTRACTOR SHALL VERIFY THE EXTENT OF REMOVAL WORK
TO PROPERLY ACCOMMODATE THE CONSTRUCTION METHOD.
3. ADDITIONAL REMOVAL AND PATCHING REQUIRED TO
ACCOMMODATE NEW CONSTRUCTION SHALL BE
CONSIDERED INCIDENTAL TO NEW WORK.
4. SEE CIVIL, STRUCTURAL, MECHANICAL, PLUMBING AND
ELECTRICAL FOR ADDITIONAL DEMOLITION REQUIREMENTS.
5. EXTENT OF SAWCUTTING OF THE CONCRETE SLAB ON GRADE
AND EXCAVATION IS NOT DEPICTED. THE CONTRACTOR SHALL
DETERMINE THE ACTUAL EXTENT OF SAWCUTTING AND
EXCAVATION REQUIRED TO ACCOMMODATE THE NEW WORK.
6. CONTRACTOR SHALL TONE ALL AREAS OF THE SITE THAT WILL
BE AFFECTED BY THE WORK PRIOR TO SAWCUTTING,
TRENCHING, EXCAVATING, ETC. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR REPAIRING ANY DAMAGE TO ANY EXISTING
INFRASTRUCTURE.
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
DEMOLITION
SITE PLAN
200102
A1.0
BC
JK
KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1" = 10'-0"A1.0
D1 DEMOLITION SITE PLAN
LEGEND
DEMOLITION NOTES
D01 REMOVE EXISTING SECURITY GATE
D03 REMOVE EXISTING FENCE
D05 REMOVE EXISTING STORM DRAIN, SEE CIVIL
D06 REMOVE EXISTING CATCH BASIN, SEE CIVIL
D07 EXISTING BUILDING TO REMAIN
D09 REMOVE EXISTING BUILDING
D10 REMOVE EXISTING K-RAIL BARRIER, SEE CIVIL
D11 EXISTING VEHICULAR GATE TO REMAIN, PROTECT IN PLACE D12 REMOVE EXISTING SIGN
D13 REMOVE EXISTING BENCH
D14 REMOVE EXISTING WHEELSTOP
D15 REMOVE EXISTING TABLE/CHAIRS
D16 REMOVE PORTION OF EXISTING KEYSTONE RETAINING WALL, SEE CIVIL D17 EXISTING COMM VAULT TO REMAIN, SEE CIVIL
D18 EXISTING JUNCTION STRUCTURE TO REMAIN, SEE CIVIL
D20 REMOVE EXISTING CATCH BASIN, SEE CIVIL
D21 REMOVE EXISTING TREE
D23 REMOVE EXISTING HVAC EQUIPMENT
D24 REMOVE EXISTING WATER FIXTURE, SEE CIVIL
D26 EXISTING RIBBON GUTTER TO REMAIN, SEE CIVIL
D27 REMOVE MAILBOX
D28 REMOVE CURB
D29 EXISTING CHAIN LINK FENCE TO REMAIN, PROTECT IN PLACE D30 REMOVE EXISTING CONCRETE/ROCK FEATURE
DEMOLITION NOTES
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 229 of 357
GENERATOR
ADMINISTRATION BUILDING
EXISTING BUILDING B EXISTING BUILDING F
PATIO
102
226'-2"128'-9"± 68'-11"
2 5
1 9
E TAYLOR
ST.
24'-
11"
102
33'-2"± 33'-1"
EXISTING BUILDING C
EXISTING BUILDING D
EXISTING BUILDING G
EXISTING
BUILDING H
A1.2
D1
001
001001
SETBACK
20'-0"
SETBACK15'-
0"
SETBAC
K
15'-
0"
SETBACK20'-
0"
SETBACK
15'-0"
001
X
30 =
0 HR
FIRE
SEPARATIO
N
DISTANCE
31'-
1"
31'-
2"
34'-
2"
X 30 = 0 HR
FIRE SEPARATION DISTANCE
041
993993
040
040
A1.6
B1
A1.6
D1
906
043043045 044
1. 2.
3. 4.
5. 6.
AT ALL DOORWAYS, VERIFY SET LEVEL OF CONCRETE.
DIMENSIONS SHOWN ON THIS SHEET ARE FOR REFERENCE
ONLY. REFER TO CIVIL DRAWINGS FOR LOCATION
COORDINATES.
ACCESSIBLE ROUTE FROM PARKING AND PUBLIC RIGHT OF
WAY SHALL NOT EXCEED 1.5% CROSS SLOPE AND SHALL HAVE
MAXIMUM SLOPE IN THE DIRECTION OF TRAVEL OF LESS THAN
4.5%.
CONTRACTOR TO PROVIDE ALL REQUIRED TRENCHING AND
CONNECTIONS TO EXISTING UTILITIES U.O.N. SEE CIVIL,
PLUMBING, AND ELECTRICAL.
SEE ENLARGED PLANS FOR ADDITIONAL INFORMATION.
PATCH AND REPAIR EXISTING STREET AS REQUIRED AFTER
INSTALLATION OF NEW UTILITIES.
ASSESSOR'S PARCEL NO.1712-505-600
1165 E TAYLOR ST.
VISTA, CA 92084
SITE ADDRESS:
OWNER:CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
LEGAL DESCRIPTION SEC 17-11-3W*NWQ*3.28 AC
M/L IN SWQ OF SWQ OF SEC
8&IN N
LOT SIZE 142,877 S.F.
3.28 ACRES)
ASPHALT PAVING, SEE CIVIL
CONCRETE PAVING/WALKWAY,
SEE CIVIL AND LANDSCAPE
SETBACK LINE
PROPERTY LINE
COLORED CONCRETE PAVING,
SEE LANDSCAPE
ACCESSIBLE PATH OF TRAVEL
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
SITE PLAN
200102
A1.1
BC
JK
MM
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
CONSTRUCTION NOTES
001 EXISTING CITY PARKING LOT
040 EXISTING CARPORT
041 EXISTING GENERATOR, SEE ELECTRICAL
043 EXISTING ELECTRICAL PANELS
044 EXISTING AUTOMATIC TRANSFER SWITCH
045 EXISTING SWITCHBOARD
102 PUBLIC PARKING (11), SEE CIVIL
906 TRANSFORMER AND PAD, SEE ELECTRICAL
993 SWITCHBOARD AND AUTOMATIC TRANSFER SWITCH, SEE ELECTRICAL SCALE:1" = 20'-0"A1.1
D1 SITE PLAN
NOTES
LEGEND
EXISTING FUEL
STATIONS
DESIGNER HAS VERIFIED THE SUBJECT PROPERTY'S GRANT
DEED AND TITLE REPORT, AND HAVE FOUND NO
EASEMENTS IN THE AREA OF CONSTRUCTION. DESIGNER
ACKNOWLEDGES THAT THEY ARE RESPONSIBLE AND
ACCOUNTABLE FOR NOT APPROVING ANY
IMPROVEMENTS IN ANY EASEMENTS.
DESIGNER OF RECORD
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 230 of 357
ADMINISTRATION BUILDING
TOTAL BUILDING AREA: 10,074 G.S.F. (9,191 N.S.F.)
CONDITIONED SPACE: 9,998 S.F.
PATIO
102
104
001
104
TYP.
105
104
E TAYLOR
ST.
102
TYP.
106
053
001
TYP.
036
946
051
127
130
TYP.
137
138
TYP.
144
147
120
101
115
150
023
TYP.
125
TYP.
160
001001
EXISTING BUILDING B EXISTING BUILDING F
162
118
130
037
G
0 2
G
0 1
A1.3
C1
A1.5
A1
A1.4
B1
A1.4
B4
A1.4
C3
A1.4
D4
038
039
G-03
223
120
184
120
120
120
120
120
120 120
120120
120120
120
120120
120
164
989
120
120
120
994
134
189105
192
191
192
30'-0"
18'-4"
25'-
7"
3'-
6"
105
193
TYP.
179
163
163
TYP.
135
6'-
6"
194
920
920
920
920
920
920
TYP.
052
920
107
107
107
920
TYP.
052
TYP.
137
ASPHALT PAVING, SEE CIVIL
CONCRETE PAVING/WALKWAY,
SEE CIVIL AND LANDSCAPE
SETBACK LINE
PROPERTY LINE
COLORED CONCRETE PAVING,
SEE LANDSCAPE
ACCESSIBLE PATH OF TRAVEL
1. 2.
3. 4.
5. 6.
AT ALL DOORWAYS, VERIFY SET LEVEL OF CONCRETE.
DIMENSIONS SHOWN ON THIS SHEET ARE FOR REFERENCE
ONLY. REFER TO CIVIL DRAWINGS FOR LOCATION
COORDINATES.
ACCESSIBLE ROUTE FROM PARKING AND PUBLIC RIGHT OF
WAY SHALL NOT EXCEED 1.5% CROSS SLOPE AND SHALL HAVE
MAXIMUM SLOPE IN THE DIRECTION OF TRAVEL OF LESS THAN
4.5%.
CONTRACTOR TO PROVIDE ALL REQUIRED TRENCHING AND
CONNECTIONS TO EXISTING UTILITIES U.O.N. SEE CIVIL,
PLUMBING, AND ELECTRICAL.
SEE ENLARGED PLANS FOR ADDITIONAL INFORMATION.
PATCH AND REPAIR EXISTING STREET AS REQUIRED AFTER
INSTALLATION OF NEW UTILITIES.
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ENLARGED SITE
PLAN
200102
A1.2
BC
JK
MM, KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1" = 10'-0"A1.2
D1 SITE PLAN ENLARGED
CONSTRUCTION NOTES
001 EXISTING CITY PARKING LOT
023 EXISTING KEYSTONE RETAINING WALL, SEE CIVIL
036 LINE OF ROOF ABOVE
037 EXISTING COMM VAULT
038 EXISTING JUNCTION STRUCTURE
039 EXISTING STORAGE CONTAINER
051 ALTERNATE BID ITEM 1: FUTURE VAN ACCESSIBLE ELECTRIC VEHICLE CHARGING STALL, SEE ELECTRICAL AND B2/T-7
052 ALTERNATE BID ITEM 1: PARKING LOT STRIPING
053 ALTERNATE BID ITEM 1: PARKING LOT ACCESSIBILITY SIGNAGE, SEE D2/T-7 101 ALTERNATE BID ITEM 5: VEHICULAR ROLLING GATE, SEE ELECTRICAL AND B1/A1.5
102 PUBLIC PARKING (11), SEE CIVIL
104 ALTERNATE BID ITEM 4: PERSONNEL GATE
105 ALTERNATE BID ITEM 4: SECURITY FENCE, SEE LANDSCAPE AND A4/ A1.5 106 CONCRETE MOW CURB, SEE LANDSCAPE
107 CONCRETE PAD, SEE LANDSCAPE
115 ALTERNATE BID ITEM 5: VEHICULAR GATE OPERATOR, SEE ELECTRICAL 118 ALTERNATE BID ITEM 5: VEHICULAR GATE CONTROLLER, SEE D3/A1.5 AND
ELECTRICAL
120 ALTERNATE BID ITEM 2: PLANTING AREA, SEE LANDSCAPE
125 EXPANSION AND SAW CUT JOINTS, SEE LANDSCAPE
127 MODULAR WETLAND, SEE CIVIL
130 STORM DRAIN CLEANOUT, SEE CIVIL
134 MAILBOX
135 SEWER CLEANOUT, SEE CIVIL
137 OBSERVATION/MAINTENANCE PORT, SEE CIVIL
138 BACKFLOW PREVENTION DEVICE ON CONCRETE PAD, SEE CIVIL 144 CATCH BASIN, SEE CIVIL
147 CMU RETAINING WALL, SEE FINISH SCHEDULE, CIVIL AND STRUCTURAL 150 SEGMENTAL BLOCK WALL, SEE CIVIL
160 AREA DRAIN, SEE CIVIL
162 STORMWATER SUBSURFACE STORAGE TANK, SEE CIVIL
163 3'-0" DEEP DETECTABLE WARNING SURFACE FULL LENGTH OF ZERO CURB AREA
164 RIBBON GUTTER, SEE CIVIL
179 ALTERNATE BID ITEM 1: WHEEL STOP, SEE B3/T-7
184 ALTERNATE BID ITEM 2: ARTIFICIAL TURF, SEE LANDSCAPE 189 SPLASHBLOCK, SEE B4/A1.5
191 EXIT LOOP, SEE ELECTRICAL
192 REVERSE LOOP, SEE ELECTRICAL
193 CONCRETE PATCH, SEE CIVIL
194 EXISTING CHAIN LINK FENCE TO REMAIN, PROTECT IN PLACE 223 CONCRETE SIDEWALK, SEE CIVIL
920 POWER INFRASTRUCTURE INCLUDED IN BASE BID
946 ALTERNATE BID ITEM 3: PEDESTAL MOUNTED IRRIGATION CONTROLLER, SEE
LANDSCAPE AND ELECTRICAL
989 GAS METER, SEE PLUMBING AND CIVIL
994 HANDHOLE, SEE ELECTRICAL
LEGEND
NOTES
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 231 of 357
A
76 B
C1
A1.3
C3
B3
C4
A3
PATIO
FITNESS
126
BREAK ROOM
125
OFFICE D1
111
OFFICE C1
110
HALL
102
OFFICE C1
109
120
120
120
120
FINISH FLOOR
0' - 0"
MTL
3 MCM
1 932
FINISH FLOOR
0' - 0"
MTL
3 MCM
1 996
FINISH FLOOR
0' - 0"
MTL
3 FINISH FLOOR
0' - 0"
MTL
3 MCM
1 OPEN
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
PATIO DETAILS
200102
A1.3
BC
JK
KG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/ 4" = 1'-0"A1.3
C1 PATIO - ENLARGED PLAN
SCALE:1/4" = 1'-0"A1.3
B3 PATIO - EAST ELEVATION
SCALE:1/4" = 1'-0"A1.3
A3 PATIO - WEST ELEVATION
SCALE:1/4" = 1'-0"A1.3
C4 PATIO - SOUTH ELEVATION
SCALE:1/4" = 1'-0"A1.3
C3 PATIO - NORTH ELEVATION
CONSTRUCTION NOTES
120 ALTERNATE BID ITEM 2: PLANTING AREA, SEE LANDSCAPE
932 LIGHT FIXTURE, SEE ELECTRICAL
996 OUTLET, SEE ELECTRICAL
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 232 of 357
A1.4
C1
18'-0"16'-8"15'-4"17'-4"
1 223
120
184
120 120
120
120
120 12019
4 6'-
0 6'-
0 6'-
8 3'-
4 41
4 67'-4"
A1.4
D1
EJ
WPJ
EJ
WPJ
EJ
WPJ
EJ
WPJ
WPJ
WPJ
EJ
WPJ
EJ
W
P
J
EJ
W
P
J
W
P
J
W
P
J
W
P
J
W
P
J
W
P
J
W
P
J
EJ
WPJ
EJ
WPJ
WPJ
WPJ
189
WPJ
106106
106
106
9'-
6 9'-
0 8'-
0 9'-
0 4'-
0 1'-
0 3'-0"
3'-0"
163
TYP.
179
054
061
087
051
TYP.
052
920
9'-
0 19'-0"
TYP.
052
10 0
20'-0"
TYP.
052
FINISH FLOOR
0' - 0"
6'-
0 CMU
1 147 A1.4
D1
FINISH GRADE
CMU
2 1'-
6 2'-6"
4'-
8 2'-
0 CONCRETE FOOTING, SEE
STRUCTURAL
FINISH GRADE, SEE CIVIL AND
LANDSCAPE
CMU RETAINING WALL, SEE FINISH
SCHEDULE, CIVIL AND STRUCTURAL
CMU CAP, SEE FINISH SCHEDULE
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
SITE DETAILS
200102
A1.4
BC
JK
KG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/4" = 1'-0"A1.4
B1 PATIO WALL - ENLARGED PLAN
SCALE:1/4" = 1'-0"A1.4
B4 ACCESSIBLE PARKING STALL
SCALE:1/4" = 1'-0"A1.4
C3 TYPICAL PARKING STALL
SCALE:1/4" = 1'-0"A1.4
D4 LOADING STALL
SCALE:1/4" = 1'-0"A1.4
C1 PATIO WALL - SOUTH ELEVATION
CONSTRUCTION NOTES
051 ALTERNATE BID ITEM 1: FUTURE VAN ACCESSIBLE ELECTRIC VEHICLE CHARGING STALL, SEE ELECTRICAL AND B2/T-7
052 ALTERNATE BID ITEM 1: PARKING LOT STRIPING
054 ALTERNATE BID ITEM 1: ACCESS AISLE, SEE D1/T-7
061 ALTERNATE BID ITEM 1: ACCESSIBLE PARKING SIGNAGE, SEE D1/T-7 087 ALTERNATE BID ITEM 1: VAN ACCESSIBLE PARKING STALL, SEE D1/T-7 106 CONCRETE MOW CURB, SEE LANDSCAPE
120 ALTERNATE BID ITEM 2: PLANTING AREA, SEE LANDSCAPE
147 CMU RETAINING WALL, SEE FINISH SCHEDULE, CIVIL AND STRUCTURAL 161 FINISH GRADE, SEE CIVIL AND LANDSCAPE
163 3'-0" DEEP DETECTABLE WARNING SURFACE FULL LENGTH OF ZERO CURB AREA
179 ALTERNATE BID ITEM 1: WHEEL STOP, SEE B3/T-7
184 ALTERNATE BID ITEM 2: ARTIFICIAL TURF, SEE LANDSCAPE 185 CMU CAP, SEE FINISH SCHEDULE
189 SPLASHBLOCK, SEE B4/A1.5
210 CONCRETE FOOTING, SEE STRUCTURAL
223 CONCRETE SIDEWALK, SEE CIVIL
920 POWER INFRASTRUCTURE INCLUDED IN BASE BID
SCALE:1/4" = 1'-0"A1.4
D1 PATIO RETAINING WALL - SECTION
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 233 of 357
115
G
0 1
CLR
2'-0" MIN.105224
TYP.
166
TYP.
192
A1.5
B1
150
225225
25'-0"
118
194104
920
101
920
920
107
920
107
6'-
0 3
3 8
3'-
0 4"
1'-0"
528
326
327
328
329
529
530
ELEVATION SECTION
25'-0" PER PLAN
341
1'-
4 3"
5'-
9 8'-0"
TYP.
303
302
324
171
173
6'-
3 341
A1.5
D2
1'-0"
210
3'-2"
3'-10"
2'-
10 3"334 336
333
332
331
330
6'-
0 BOTH SIDES
3'-0" MIN. WIRE MESH
434
NOTE:
1. PROVIDE WIRE MESH OVER GATE PICKETS.
6'-0"
AFG
FINISH GRADE, SEE
CIVIL AND
LANDSCAPE
GUIDE ROLLER ASSEMBLY
SECURED TO SECURITY
FENCE
V-GROOVE TRACK AND
WHEEL
1"
M
A
X
1'-
4 1'-1" 11"
SECURITY FENCE, SEE A4/A1.5
1'-
0 2'-0"
ASPHALT PAVING, SEE CIVIL
CONCRETE CURB AND
PAVING, SEE CIVIL
2" SQUARE ALUMINUM
FRAME
2" SQUARE ALUMINUM
BARS @ 9" O.C.
6"1'-0"6"
2" HORIZONTAL ALUMINUM
EXTRUSIONS @ 3" O.C.
2" HORIZONTAL ALUMINUM
EXTRUSIONS @ 3" O.C.
3"
5'-
9 6'-
0 1'-
4 1'-
0 8"
4"
2" SQUARE ALUMINUM
POSTS @ 6'-0" O.C. MAX
SPACE EVENLY)
2" HORIZONTAL ALUMINUM
EXTRUSIONS @ 3" O.C.
FINISH GRADE, SEE CIVIL
AND LANDSCAPE
CONCRETE FOOTING, SEE
STRUCTURAL
CONCRETE WALKWAY
WHERE OCCURS, SEE CIVIL
CONDUIT THROUGH POST AND
FOOTING
3" DIAMETER TUBE STEEL POST
WELD AND GRIND SMOOTH
ALL JOINTS, PAINT
2'-
0 1'-4"
WEATHERPROOF ENCLOSURE
WITH DIGITAL KEYPAD AND
KEY OPERATED SWITCH
3'-
8 FINISH GRADE, SEE CIVIL
AND LANDSCAPE
ASPHALT PAVING, SEE CIVIL
2"
NOTE:
FIRE APPARATUS ACCESS ROAD OBSTRUCTION: AUTOMATIC GATES SHALL
BE PROVIDED WITH BOTH AN OPTICOM DETECTION SYSTEM AND A KNOX KEY SWITCH OVERRIDE. PROVISIONS SHALL BE TAKEN TO OPERATE THE GATE UPON THE LOSS OF POWER.
CONCRETE CURB, SEE CIVIL
COMPACTED FILL
ASPHALT PAVING, SEE CIVIL
EXPANSION JOINT AND SEALANT
18" DIAMETER CONCRETE FOOTING
6" DIAMETER STEEL PIPE
SLOPE 3%
FILL WITH CONCRETE SLOPE AWAY FROM
CENTER
3'-
0 1'-6" MIN.
3'-
6 M
IN
CONCRETE FOOTING, SEE STRUCTURAL
3"
2'-0"
1'-
0 2"
8"
2"
2"
PLAN
ELEVATION
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
SITE DETAILS
200102
A1.5
BC
JK
MM
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/4" = 1'-0"A1.5
A1 VEHICULAR ROLLING GATE - ENLARGED PLAN
SCALE:1/ 4" = 1'-0"A1.5
B1 VEHICULAR ROLLING GATE - SOUTH ELEVATION
SCALE:1/ 2" = 1'-0"A1.5
A4 SECURITY FENCE - ELEVATION
SCALE:1/2" = 1'-0"A1.5
B3 PERSONNEL GATE
CONSTRUCTION NOTES
101 ALTERNATE BID ITEM 5: VEHICULAR ROLLING GATE, SEE ELECTRICAL AND B1/A1.5
104 ALTERNATE BID ITEM 4: PERSONNEL GATE
105 ALTERNATE BID ITEM 4: SECURITY FENCE, SEE LANDSCAPE AND A4/ A1.5 107 CONCRETE PAD, SEE LANDSCAPE
115 ALTERNATE BID ITEM 5: VEHICULAR GATE OPERATOR, SEE ELECTRICAL 118 ALTERNATE BID ITEM 5: VEHICULAR GATE CONTROLLER, SEE D3/A1.5 AND
ELECTRICAL
150 SEGMENTAL BLOCK WALL, SEE CIVIL
161 FINISH GRADE, SEE CIVIL AND LANDSCAPE
166 STEEL PIPE BOLLARD, SEE C4/A1.5
171 TOP OF CURB, SEE CIVIL LANDSCAPE
173 FINISH GRADE, SEE CIVIL
186 GUIDE ROLLER ASSEMBLY SECURED TO SECURITY FENCE
188 SECURITY FENCE, SEE A4/ A1.5
192 REVERSE LOOP, SEE ELECTRICAL
194 EXISTING CHAIN LINK FENCE TO REMAIN, PROTECT IN PLACE 210 CONCRETE FOOTING, SEE STRUCTURAL
224 CONCRETE CURB, SEE CIVIL AND LANDSCAPE
225 ASPHALT PAVING, SEE CIVIL
228 CONCRETE CURB AND PAVING, SEE CIVIL
302 2" SQUARE ALUMINUM POSTS @ 6'-0" O.C. MAX (SPACE EVENLY) 303 2" SQUARE ALUMINUM (TOP AND BOTTOM) FRAME
324 BRACKET
326 2" SQUARE ALUMINUM FRAME
327 4" SQUARE ALUMINUM POST
328 2" X 4" ALUMINUM BOTTOM RAIL
329 V-GROOVE TRACK AND WHEEL
330 3" SQUARE ALUMINUM POST IN CONCRETE FOOTING
331 1" HORIZONTAL ALUMINUM PICKETS
332 PREP FOR LOCK HARDWARE
333 PANIC HARDWARE ON OPPOSITE SIDE
334 HEAVY DUTY SPRING HINGES WELDED TO FRAME
336 1 1/ 2" SQ. ALUMINUM FRAME
341 2" SQUARE ALUMINUM BARS @ 9" O.C.
434 KICKPLATE ON OPPOSITE SIDE
528 TOP GUIDE ROLLERS
529 6" V-GROOVE WHEEL
530 POST ENCASED IN CONCRETE, TYP.
920 POWER INFRASTRUCTURE INCLUDED IN BASE BID
SCALE:1" = 1'-0"A1.5
D1 VEHICULAR ROLLING GATE - SECTION
SCALE:1" = 1'-0"A1.5
D2 SECURITY FENCE - SECTION
SCALE:1" = 1'-0"A1.5
D3 GATE CONTROLLER
SCALE:3/ 4" = 1'-0"A1.5
C4 STEEL PIPE BOLLARD
SCALE:1 1/ 2" = 1'-0"A1.5
B4 SPLASH BLOCK
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 234 of 357
32'-
6"
TYP.
959
25'-6"
042
45'-
6"
45'-6"
TYP.
959
042
1.CONTRACTOR TO VERIFY DIMENSIONS AND CLEARANCE
REQUIREMENTS OF EXISTING CARPORTS AND NOTE ANY
DISCREPANCIES AS A PART OF THE SUBMITTAL REVIEW
PROCESS.
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
SITE DETAILS
200102
A1.6
Checker
Approver
Author
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/4" = 1'-0"A1.6
B1 CARPORT 1 - ENLARGED PLAN
SCALE:1/ 4" = 1'-0"A1.6
D1 CARPORT 2 - ENLARGED PLAN
CONSTRUCTION NOTES
042 EXISTING METAL ROOF DECK
959 PHOTOVOLTAIC PANELS, SEE STRUCTURAL AND ELECTRICAL
NOTES
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 235 of 357
DW
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG CG
CG
A3.1
B1
A3.2
B1
A3.2
D1
A3.1
D1
A4.2
A1
2 G
E
J J
F
H
3 C C
A A
98 764
10 10
1 1
BREAK ROOM
125
LOBBY
100
SERVER
118
OFFICE D1
119
OFFICE D1
120
MULTI-PURPOSE
112
RECEPTION
103
STORAGE
114
RECEIVING
116
OPEN WORK
STATIONS
117
COPY/MAIL
ROOM
115
WOMEN'S
128
OFFICE B
107
HALL
102
RESTROOM
104
CONFERENCE
106
RESTROOM
101
COPY
105
HWH
127
ELECTRICAL
132
MEN'S
129
OFFICE D1
121
MEN'S LOCKER
130
WASH ROOM
131
STORAGE
123
HALL
122
FITNESS
126
JAN
124
OFFICE D1
111
OFFICE C1
108
OFFICE C1
110
OFFICE C1
109
B
5 D
A4.1
D1
STORAGE
113
10 9
A
10 8
A
10 7
A
110A
111A
112A
10 4
A
10 6
B
10 3
A
102B
10 1
A
102A
12 5
A
114A 11
6 C
116B113A
118A
119A
120A121A
123A12
4A
12 9A
13 0A
13 2A
131A
13 1
B
122A
127A12
8 B
12 6
B
125B
12 6
A
A4.2
B1
A4.1
B1
502
518
A
AA
HH
HH
GG
FF
EE
A5.1
A1
A5.1
B1
A5.1
C1
A5.1
D1
A5.2
A1
A5.2
D1
A5.3
A1
A5.3
D1
A5.4
D1
525
078
TYP.
902
082
426
FR
133
13 3
A
10 6A
KK
MM
JJ
NN
079
426
426
079
917 934
426
128A
426
504
922922
426
080
8 8
6 6
8 88
99 8
6 8
8 10
5 6
8 8
149
19 14
11 8
8 16
14 14
14 14 14
14 14
14 18
14 15
15 15
14 910
14 16
16 1616
14 14
14 14
14 A4.2
D1
14 14
14 21
14 16
14 9
9 9
121499
99 14 15
15 19 22
229
10 10914
16 9
11 11
10 14
19 15
11 10
14 14
14 8
8 88
14 14
14 14
15 15
13 14
15 16
16 14
20 HH
901
19 18
A4.1
A1
14 9
7 7
2 2
2 2
2 2
LL
BB
CC
DDDD
080
116A
8 14
14 7
3 14
8 DD
991
991
OFFICE E1
134
OFFICE E1
135
OFFICE E1
136
OFFICE E1
137
OFFICE E1
138
OFFICE E1
139
OFFICE E1
140
16 14
14 14 14 14 14 14
11 7A
11 7
B
14 0
A
13 9
A
13 8
A
13 7
A
13 6
A
13 5
A
13 4
A
4 922
543
10 553552
373
373
6 079079
079
079
079
373
373
373
082
079
096
611
611611
934
8 OO
10 0A
A2.1
A4
1. 2.
3. 4.
5. 6.
7. 8.
9. 10.
SEE A2.2 FOR DIMENSION PLAN
SEE ENLARGED PLANS FOR ADDITIONAL INFORMATION
SEE A2.3 FOR REFLECTED CEILING PLANS
SEE A4.7, A4.8, A4.9 FOR WALL TYPES
SEE A6.1 FOR ROOM FINISH SCHEDULE
SEE A6.2 FOR DOOR AND WINDOW SCHEDULES
SEE A6.3 FOR STOREFRONT SCHEDULE
STAINLESS STEEL CORNER GUARDS, TYP. ALL EXTERIOR
CORNERS ON INTERIOR OF BUILDING, SEE D3 & D4/A7.9
FINISH FLOOR ELEVATION: 530.80, SEE CIVIL
WALL AND CEILING MATERIALS SHALL NOT EXCEED THE
FLAME SPREAD CLASSIFICATIONS IN CBC TABLE 803.13
2x4 STUD WALL
2x6 STUD WALL
2x8 STUD WALL
2x12 STUD WALL
C
98 LOBBY
100
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
FLOOR PLAN
200102
A2.1
BC
JK
MM, KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
CONSTRUCTION NOTES
078 ROOM IDENTIFICATION SIGN, VERIFY TEXT WITH OWNER, SEE D4/T-6 079 TACTILE EXIT SIGN, SEE D3/T-6
080 SEMI-RECESSED FIRE EXTINGUISHER. 5LB; UL RATING 2A: 10B:C; SEE D4/T-5
FOR MOUNTING REQUIREMENTS
082 TACTILE EXIT ROUTE SIGN, SEE D3/T-6
096 ISA SYMBOL, SEE B2/T-6
373 WALL MOUNTED TV, PROVIDE BLOCKING, SEE DETAIL A1/ A7.10 426 TOILET ROOM ISA SIGNAGE AND TEXT ON WALL ADJACENT TO DOOR, 502 EMERGENCY EYE WASH/SHOWER, SEE PLUMBING
504 ROOF ACCESS LADDER, SEE B2/A7.10
518 ICE MACHINE AND BIN, SEE PLUMBING AND ELECTRICAL
525 MOP SINK, SEE PLUMBING
543 WALL HUNG FIRE EXTINGUISHER. 5LB; UL RATING 4A: 20B:C; SEE D4/T-5 FOR
MOUNTING REQUIREMENTS
552 FIRE RISER
553 FIRE RISER PANEL
611 ACCENT PAINT, SEE FINISH SCHEDULE
901 DISTRIBUTION BOARD, SEE ELECTRICAL
902 FLOOR DRAIN, SEE PLUMBING
917 WATER HEATER, SEE ELECTRICAL AND PLUMBING
922 ELECTRICAL PANELS, SEE ELECTRICAL
934 FLOOR SINK, SEE PLUMBING
991 HYDRATION SYSTEM, SEE PLUMBING AND ELECTRICAL
SCALE:1/8" = 1'-0"A2.1
D1 FLOOR PLAN
NOTES
WALL LEGEND
SCALE:1/8" = 1'-0"A2.1
A4 FLOOR PLAN - LOBBY NORTH UPPER WALL
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 236 of 357
DW
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG CG
CG
2 G
11 0
10 0
40 6
25 3
6'-
9 2'-
3 E
J J
F
H
3 C C
A A
98 764
10 10
1 1
126'-8"
10'-0"29'-11"14'-5"53'-11"10'-5"8'-0"
95 9
B
5 D
3'-0"
1'-2"
8'-4"12'-6"14'-0"14'-11"
2'-6"6'-8"22'-5"95'-1"
14'-6"9'-0"6'-2"5'-6" 9'-2"
1'-9"
13 8
1'-
5 7'-
6 5'-
10 12
1 10
1 4'-
5 8'-
1 2'-
8 1'-0"5'-8"10'-11"11'-6"10'-5"5'-8"10'-5"10'-5"10'-5"10'-5"10'-5"10'-4"6'-1"10'-6" 1'-
2 5'-
10 6'-
1 0
5'-
6 5'-
0 7'-
6 6'-
0 6'-
3 BREAK ROOM
125
LOBBY
100
SERVER
118
OFFICE D1
119
OFFICE D1
120
MULTI-PURPOSE
112
RECEPTION
103
STORAGE
114
RECEIVING
116
OPEN WORK
STATIONS
117
COPY/MAIL
ROOM
115
WOMEN'S
128
OFFICE B
107
HALL
102
RESTROOM
104
CONFERENCE
106
RESTROOM
101
COPY
105
HWH
127
ELECTRICAL
132
MEN'S
129
OFFICE D1
121
MEN'S LOCKER
130
WASH ROOM
131
STORAGE
123
HALL
122
FITNESS
126
JAN
124
OFFICE D1
111
OFFICE C1
108
OFFICE C1
110
OFFICE C1
109
STORAGE
113
3'-7" 2'-9"
9'-4"7'-2"10"22'-7"
FR
133
2'-2"13'-8"2'-2"
1'-2"
8'-10"6'-10"1'-2"21'-11"
21 0
23 9
8'-
3 42
9 4'-
7 3'-
8 3'-
6 9'-
1 1'-
1 1
15 2
5'-
10 12
6 5'-
0 1'-
3 3'-
0 9"
3"3'-
0 9'-
3 7'-
2 2'-
1 0
9'-
3 5'-
1 0
4'-
0 3'-
6 13'-1"9'-8"
2'-0"
8'-6"7'-8"
14 1
0 3'-
0 12
1 4'-
3 2'-3"
10 4
3'-
0 1'-
10 2'-4"
3'-10"2'-4"
5'-1"2'-3"
5'-4"
3'-10"
1'-0"
R.O.
4'-0"
6"
12'-6"7'-3"10'-2"7'-11"
7'-
11 1'-
0 5'-
6 11
0 3'-
2 6'-0"
3'-
0 2'-11"8'-0"
9'-
7 8'-
5 OFFICE E1
140
OFFICE E1
139
OFFICE E1
138
OFFICE E1
137
OFFICE E1
136
OFFICE E1
135
OFFICE E1
134
10'-0"5'-10"
10'-9"
9"
1'-0"
1'-0"
2'-
1 2"
2"
10'-3"
1'-11"
1'-
11 17
6 1'-11"
4'-5"
8'-10"18'-4"3'-3" 3'-4"
1'-11"
3'-
5 3'-
3 6'-
0 7'-
2 4'-
8 4'-4"7'-2"
9'-
1 6'-
0 17
6 7'-
2 14'-8"11'-9"6'-0" 3'-0"
5'-
1 0
11 8
27 6
12 3
9'-
4 11
8 9'-
9 3"
14 11
1'-
2 14
1 5'-
6 3"
A2.2
A4
9'-
7 14
9 5'-
1 5'-3"
2x4 STUD WALL
2x6 STUD WALL
2x8 STUD WALL
2x12 STUD WALL
1. 2.
3. VERIFY ALL ROUGH OPENING SIZES PRIOR TO FRAMING
SEE ENLARGED PLANS FOR ADDITIONAL INFORMATION
CONTRACTOR SHALL COORDINATE FRAMING WITH
STOREFRONT AND METAL PANEL/COMPOSITE METAL MATERIALS
C
98 3"
2'-1"10'-5"
LOBBY
100
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
DIMENSION
PLAN
200102
A2.2
BC
JK
KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/8" = 1'-0"A2.2
D1 DIMENSION PLAN
WALL LEGEND
NOTES
SCALE:1/8" = 1'-0"A2.2
A4 DIMENSION PLAN - LOBBY NORTH UPPER WALL
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 237 of 357
M
M
MM
M
M
M
M
M
M
M
M
M M
M
M
M
M
M
M
M
M
MM
MM
DS
DS
M
DS
M
2 G
E
J
J
F
H
3 C C
A A
98764
101
1 B
5 D
BREAK ROOM
125
LOBBY
100
SERVER
118
OFFICE D1
119
OFFICE D1
120
MULTI-PURPOSE
112
RECEPTION
103
STORAGE
114
RECEIVING
116
OPEN WORK
STATIONS
117
COPY/MAIL
ROOM
115
WOMEN'S
128
OFFICE B
107
HALL
102
RESTROOM
104
CONFERENCE
106
RESTROOM
101
COPY
105
HWH
127
ELECTRICAL
132
MEN'S
129
OFFICE D1
121
MEN'S LOCKER
130
WASH ROOM
131
STORAGE
123
HALL
122
FITNESS
126
JAN
124
OFFICE D1
111
OFFICE C1
108
OFFICE C1
110
OFFICE C1
109
STORAGE
113
10' -0"
10' -0"
10' - 0"
10' - 0"
10' -0"
10' - 0"
9' - 1"
10' -0"
10' -0"
10' -0"
10' -0"
10' -0"
10' -0"
10' -0"10' -0"10' -0"
10' -0"
10' -0"
12' -0"
10' -0"
10' -0"
955955
955955
10' -0"
955955
10' -0"
FR
133
10' -0"
10' -0"
10' -0"
9' -1"
9' -0"
10' -0"
9' -1"
OFFICE E1
140
OFFICE E1
139
OFFICE E1
138
OFFICE E1
137
OFFICE E1
136
OFFICE E1
135
OFFICE E1
134
9' -0"
9' - 0"
9' - 0"
10' -0"
10' - 0"TYP.
684
683
683
891
955955
MCM
1 MTL
2 MTL
3 MCM
1 MCM
1 MCM
1 955
955
476
9' -0"
8' - 0"8' - 0"8' - 0"
9' -1"9' -1"9' -1"9' -1"9' -1"9' -1"
A7.8
D3
A7.8
D3
A7.8
D3
EQ 10'-6"EQ5'-
6 4'-
0 4'-
6 4'-
0 4'-
6 4'-
0 5'-
6 935
935
897
1. 2.
3. 4.
5. 6.
7. 8.
9. 10.
11. 12.
CONTRACTOR SHALL VERIFY DIMENSIONS AND LAYOUT OF ALL
FIXTURES AND EQUIPMENT WITH ARCHITECT PRIOR TO ROUGH IN.
REQUEST CLARIFICATION FOR ANY DIMENSIONS NOT SHOWN.
PROVIDE STAINLESS STEEL ACCESS PANELS AS REQUIRED FOR
MECHANICAL EQUIPMENT, SEE MECHANICAL.
CONTRACTOR MAY, AT HIS OPTION, USE METAL STUD FRAMI NG IN
LIEU OF SUSPENDED SYSTEM FOR GYPSUM BOARD CEILINGS,
CONTRACTOR TO SUBMIT CEILING LAYOUT PLANS FOR APPROVAL
PRIOR TO SUBSTITUTION ACCEPTANCE.
INSTALL R-30 BATT INSULATION ABOVE ALL CEILINGS IN RAFTER/ TRUSS SPACE.
SEE ROOM FINISH SCHEDULE FOR CEILING HEIGHTS NOT SHOWN.
SUSPENDED CEILING SHALL COMPLY WITH CBC.
EXIT SIGNS SHALL BE READILY VISIBLE FROM ANY DIRECTION OR APPROACH. EXIT SIGNS SHALL BE LOCATED AS NECESSARY TO
CLEARLY INDICATE THE DIRECTION OF EGRESS TRAVEL. NO ONE POINT SHOULD BE MORE THAN 100 FEET FROM THE NEAREST VISIBLE SIGN.
PAINT ALL EXPOSED PIPING, EXPOSED FRAMING AND EXHAUST
DUCT WORK.
SEE A2.1 FOR FLOOR PLAN.
SEE A2.2 FOR DIMENSION PLAN.
SEE ENLARGED PLANS FOR ADDITIONAL INFORMATION.
MATERIALS EXPOSED WITHIN THE PLENUM SHALL BE
NONCOMBUSTABLE PER CMC 602.2 (FLAME SPREAD INDEX NOT TO EXCEED 25 AND SMOKE DEVELOPED INDEX NOT TO EXCEED 50). SEE WALL SECTIONS AND A7.8.
GYPSUM BOARD CEILING, SEE FINISH SCHEDULE
SUPPLY AIR DIFFUSER DUCT, SEE MECHANICAL
ACCESS PANEL
ILLUMINATED EXIT SIGN, SEE ELECTRICAL
2'X2' ACOUSTIC CEILING TILE, SEE
FINISH SCHEDULE
RETURN AIR DIFFUSER, SEE MECHANICAL
STRIP LIGHT FIXTURE, SEE ELECTRICAL
LIGHT FIXTURE, SEE ELECTRICAL
LIGHT FIXTURE, SEE ELECTRICAL
LIGHT FIXTURE, SEE ELECTRICAL
TUBULAR SKYLIGHT DIFFUSER
ACT CEILING TUBULAR SKYLIGHT DIFFUSER
METAL SOFFIT (MTL-1), SEE FINISH SCHEDULE
EXHAUST AIR DIFFUSER, SEE MECHANICAL
EXHAUST AIR DIFFUSER, SEE MECHANICAL
WALL SCONCE, SEE ELECTRICAL
LIGHT FIXTURE, SEE ELECTRICAL
METAL SOFFIT (MTL-2), SEE FINISH SCHEDULE
SUPPLY AIR DIFFUSER, SEE MECHANICAL
METAL SOFFIT (MTL-3), SEE FINISH SCHEDULE
LIGHT FIXTURE, SEE ELECTRICAL
EMERGENCY LIGHT FIXTURE, SEE ELECTRICAL
OCCUPANCY SENSOR
DAYLIGHT SENSOR
M
DS
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
REFLECTED
CEILING PLAN
200102
A2.3
BC
JK
KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/8" = 1'-0"A2.3
D1 REFLECTED CEILING PLAN
CONSTRUCTION NOTES
476 ROOF ACCESS LADDER AND HATCH
683 ACOUSTICAL CLOUD KIT
684 ACOUSTICAL PANEL ATTACHED TO UNDERSIDE OF STRUCTURE, SEE FINISH
SCHEDULE
891 ACCESS PANEL, SEE MECHANICAL
897 ROOF/OVERFLOW DRAIN, SEE PLUMBING
935 WATER LINE, SEE PLUMBING
955 OPEN TO STRUCTURE ABOVE
NOTES
LEGEND
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 238 of 357
E
J J
H
C C
A A
98764
101
1 B
5 D
1/
2 12
1/
2 1
2 1/
2 1
2 1/
2 12
1/4" / 12"1/4" / 12"1/4" / 12"
1/4" / 12"1/4" / 12"
1/4" / 12"1/4" / 12"1/4" / 12"
SL DN SL DN
SL
D
N
SL DN
SL DN
SL
D
N
SLDNSLDN
SL
D
N
SL DN
SL DN
SL
D
N
SL DN SL DN SL DN SL DN SL DN SL DN
1/
2 1
2 SL
D
N
1/4" / 12"
1/4" / 12"1/4" / 12"
2"
12 1/4" / 12"1/4" / 12"1/4" / 12"
1/4" / 12"
1/4" / 12"1/4" / 12"1/4" / 12"
SLDNSLDN SL DN
SL DN
SL
D
N
A7.4
A3
A7.4
A4
A7.4
A2
A7.5
B1
A7.4
A3
G-04
986
835836
836 835
851852 851852
985
990
990
TYP.
833
TYP.
515
TYP.
515
TYP.
572
948 911 912 913
914
TYP.
909
910
908
911
914
915
A7.4
A3
A7.4
A4
A7.4
B2
A7.4
A3
A7.5
B1
A7.5
B3
A7.4
C4
A7.4
A2
A7.4
B2
A7.4
A2
A7.4
B2
A7.4
B2
A7.4
A2
A7.4
A4
A7.5
D3
A7.5
D3
A7.4
A4
A7.4
A4
A7.4
B4
A7.4
A2
A7.4
B2
A7.5
D2
TYP.
968
450
551
A7.5
D1
A7.5
D1
1. 2.
3. 4.
5. SEE ELECTRICAL, MECHANICAL, AND PLUMBING FOR
LOCATION OF EQUIPMENT, VENTS, DUCTS, ETC.
BATT INSULATION R-30 AT ROOF CAVITY.
DUCT AND CONDUIT PENETRATIONS THROUGH ROOF, SEE
A7.4 DETAILS, MECHANICAL, ELECTRICAL AND PLUMBING.
VAPOR BARRIER WILL BE PROVIDED ON WARM -IN WINTER
SIDE OF ATTIC INSULATION.
ALL ROOF COVERINGS SHALL HAVE A CLASS A FIRE RATING.
BUILT-UP ROOFING, SEE FINISH SCHEDULE
PHOTOVOLTAIC PANELS, SEE ELECTRICAL
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ROOF PLAN
200102
A2.4
BC
JK
KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/8" = 1'-0"A2.4
D1 ROOF PLAN
NOTES
LEGEND
CONSTRUCTION NOTES
361 2X BRACE, SEE STRUCTURAL
450 ROOF ACCESS HATCH AND SAFETY RAILING, SEE B1/A7.10 AND C1/A7.10 515 TUBULAR SKYLIGHT
551 ACCESS DOOR
572 VTR, SEE D4/A7.4 AND PLUMBING
833 BUILT-UP ROOF, SEE FINISH SCHEDULE
835 ROOF SCUPPER, C1/A7.5
836 ROOF OVERFLOW SCUPPER, C1/A7.5
851 ROOF SCUPPER, C2/A7.5
852 ROOF OVERFLOW SCUPPER, C2/A7.5
908 AIR INTAKE, SEE MECHANICAL
909 EXHAUST FAN, SEE D2/A7.4 AND MECHANICAL
910 DRYER EXHAUST, SEE D3/A7.4, MECHANICAL AND PLUMBING 911 ROOF RECEPTOR, SEE MECHANICAL
912 EXPANSION TANK, SEE MECHANICAL
913 AIR SEPARATOR, SEE MECHANICAL
914 PUMP, SEE MECHANICAL
915 SHUTOFF VALVE AND BACKFLOW PREVENTER, SEE PLUMBING
948 BOILER, SEE MECHANICAL
968 ROOF DRAIN AND OVER FLOW DRAIN, SEE CIVIL AND PLUMBING, SEE C2/A7.4
985 CONDENSING UNIT, SEE MECHANICAL
986 PACKAGED ROOFTOP UNIT, SEE MECHANICAL
990 HOSE BIBB, SEE PLUMBING
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 239 of 357
P
M
P
M
P
M
P
M
2 G
E
J J
F
H
3 C C
A A
98764
10 10
1 1
B
5 D
TYP.
902
934
A7.6
C2
A7.6
C2
A7.6
A2
A7.6
D2
A7.6
A2
A7.6
D1
A7.6
A2
A7.6
A2
A7.6
D2
A7.6
D2
A7.6
D1
A7.6
D2
A7.6
D2
A7.6
A2
TYP.
903
TYP.
904
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
A1
A7.6
D2
A7.6
D2
A7.6
A2
A7.6
A2
A7.6
A1
A7.6
D2
A7.6
D2
A7.6
A1
A7.6
D2
A7.6
A1
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2A7.6
D2
A7.6
A1
A7.6
A1
A7.6
A1
A7.6
A1
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
A3
A7.6
A1
A7.6
A3
A7.6
A3
A7.6
D3
A7.6
D2
A7.6
A4
A7.6
C1
A7.6
C3
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
D2
A7.6
A1
A7.6
A1
A7.6
A1
A7.6
C2
A7.6
D2
A7.6
A2
A7.6
A2
A7.6
A1
A7.6
B4
A7.6
A2
A7.6
B2
A7.6
B2
A7.6
B4
A7.6
B3
A7.6
D2
A7.6
D2
A7.6
C2
A7.6
B1
A7.6
B3
A7.6
A2
A7.6
A3
A7.6
A2
A7.6
A2
A7.6
A3
CONCRETE CURB, SEE STRUCTURAL AND
CURB DETAILS
RECESSED SLAB, SEE STRUCTURAL
1. VERIFY CURB WIDTH WITH ALL WALL SECTION AND WALL
TYPES
2. SACK AND PATCH CONCRETE CURB TO PROVIDE SMOOTH
FINISH WITH UNIFORM COLOR WHERE EXPOSED. SEAL
CONCRETE SLAB AND CURB.
3. FACE OF FOUNDATION DOES NOT ALIGN WITH FACE OF
STUD/GRID LINE. SEE DETAILS AND STRUCTURAL.
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
SLAB PLAN
200102
A2.5
BC
JK
KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/8" = 1'-0"A2.5
D1 CURB PLAN
CONSTRUCTION NOTES
902 FLOOR DRAIN, SEE PLUMBING
903 POWER FLOOR BOX AND VOICE/DATA OUTLET, SEE ELECTRICAL 904 POWER FLOOR BOX AND VOICE/DATA CONNECTION, SEE ELECTRICAL 934 FLOOR SINK, SEE PLUMBING
LEGEND
NOTES
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 240 of 357
T.O.P. 1
13' -6"
FINISH FLOOR
0' -0"
FINISH FLOOR
0' -0"
MAX HT.
22' -6"
T.O.P. 2
16' -6"
E
T.O.P. 3
21' -9"
J CAD
314MCM
1 MTL
3 MCM
1 077094905932
515
TYP.
944
MTL
2TYP.
832
918 918
T.O.P. 1
13' -6"
FINISH FLOOR
0' - 0"
FINISH FLOOR
0' - 0"
MAX HT.
22' -6"
T.O.P. 2
16' -6"
T.O.P. 3
21' -9"
9 8 7 641015
MTL
3 MTL
2 851 852
055
MCM
1 990
MTL
4 999
TYP.
832
918
918
918
905
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
EXTERIOR
ELEVATIONS
200102
A3.1
BC
JK
MM, KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/ 8" = 1'-0"A3.1
B1 EAST EXTERIOR ELEVATION
SCALE:1/8" = 1'-0"A3.1
D1 NORTH EXTERIOR ELEVATION
CONSTRUCTION NOTES
055 EXTERIOR BUILDING SIGNAGE, SEE C2/A7.10
077 KNOX BOX @ +60" AFF
094 BUILDING SEAL, SEE D2/A7.10
314 HORIZONTAL METAL SIDING OVER BUILDING PAPER, SEE FINISH SCHEDULE 515 TUBULAR SKYLIGHT
832 PREFINISHED PARAPET FLASHING
851 ROOF SCUPPER, C2/A7.5
852 ROOF OVERFLOW SCUPPER, C2/A7.5
905 WALL CLEAN OUT, SEE PLUMBING
918 JUNCTION BOX FOR SECURITY CAMERA, SEE ELECTRICAL
932 LIGHT FIXTURE, SEE ELECTRICAL
944 HVAC EQUIPMENT, SEE MECHANICAL
990 HOSE BIBB, SEE PLUMBING
999 OVERFLOW ROOF DRAIN NOZZLE, SEE PLUMBING
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 241 of 357
FINISH FLOOR
0' -0"
FINISH FLOOR
0' - 0"
MAX HT.
22' - 6"
T.O.P. 2
16' -6"
T.O.P. 3
21' - 9"
31015
518
MCM
1 MTL
2 MTL
3 MCM
1 315 999
MTL
4 999
TYP.
832
999
918 918
T.O.P. 1
13' -6"
FINISH FLOOR
0' -0"
FINISH FLOOR
0' -0"
MAX HT.
22' -6"
T.O.P. 2
16' -6"
T.O.P. 3
21' -9"
JHCABD
MTL
2 MTL
3 129995999
MTL
4 TYP.
952944551
TYP.
832
502 907
918
918
990
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
EXTERIOR
ELEVATIONS
200102
A3.2
BC
JK
MM, KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/ 8" = 1'-0"A3.2
B1 SOUTH EXTERIOR ELEVATION
SCALE:1/ 8" = 1'-0"A3.2
D1 WEST EXTERIOR ELEVATION
CONSTRUCTION NOTES
129 GAS METER LOCATION
315 VERTICAL METAL SIDING, SEE FINISH SCHEDULE
502 EMERGENCY EYE WASH/SHOWER, SEE PLUMBING
518 ICE MACHINE AND BIN, SEE PLUMBING AND ELECTRICAL
551 ACCESS DOOR
832 PREFINISHED PARAPET FLASHING
907 STUB OUT FOR COOLER FILLING STATION, SEE PLUMBING
918 JUNCTION BOX FOR SECURITY CAMERA, SEE ELECTRICAL
944 HVAC EQUIPMENT, SEE MECHANICAL
952 MECHANICAL EQUIPMENT, SEE MECHANICAL
990 HOSE BIBB, SEE PLUMBING
995 LIGHT FIXTURE WHERE OCCURS, SEE ELECTRICAL
999 OVERFLOW ROOF DRAIN NOZZLE, SEE PLUMBING
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 242 of 357
T.O.P. 1
13' -6"
FINISH FLOOR
0' - 0"
FINISH FLOOR
0' -0"
T.O.P. 2
16' -6"
T.O.P. 3
21' -9"
T.O.P. 3
21' -9"
JCB
FITNESS
126
HALL
122
MEN'S LOCKER
130
TYP.
812
674
TYP.
205
675
A4.3
D4
A4.4
D1
JAN
124
OFFICE D1
121
T.O.S.
12' -6"
382
T.O.P.
14' - 6"
T.O.S.
13' - 6 1/2"
FINISH FLOOR
0' - 0"
FINISH FLOOR
0' -0"
T.O.P. 2
16' -6"
T.O.P. 3
21' -9"
T.O.P. 3
21' -9"
JCD
OPEN WORK
STATIONS
117
BREAK ROOM
125
PATIO
676 674
676
952
A4.4
D2
OFFICE E1
139
T.O.P.
14' - 6"
683
T.O.S.
13' - 6 1/2"
T.O.S.
13' - 6 1/2"
1. 2.
3. 4.
5. 6.
NOTES AND DETAILS APPLY TO ALL SECTIONS U.N.O.
FOR FINISH SCHEDULE SEE A6.1.
PROVIDE R-30 BATT INSULATION AT ROOF CAVITY.
PROVIDE R-13 BATT INSULATION AT EXTERIOR WALLS.
PROVIDE SOUND ATTENUATION BATT INSULATION AT INTERI OR
WALLS.
MATERIALS EXPOSED WITHIN THE PLENUM SHALL BE
NONCOMBUSTABLE PER CMC 602.2 (FLAME SPREAD INDEX
NOT TO EXCEED 25 AND SMOKE DEVELOPED INDEX NOT TO
EXCEED 50). SEE WALL SECTIONS AND A7.8.
FINISH FLOOR
0' -0"
FINISH FLOOR
0' -0"
T.O.P. 2
16' -6"
T.O.P. 2
16' - 6"
GJC
MEN'S LOCKER
130
WASH ROOM
131
HALL
122
WOMEN'S
128
A4.3
D1
A4.3
D2
T.O.S.
13' - 6 1/2"
T.O.S.
13' - 9 1/2"
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
BUILDING
SECTIONS
200102
A4.1
BC
JK
KG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
CONSTRUCTION NOTES
205 CONCRETE SLAB ON GRADE, SEE STRUCTURAL
382 BEAM, SEE STRUCTURAL
674 EXPOSED STRUCTURE
675 ACOUSTICAL CEILING TILE AND GRID, SEE FINISH SCHEDULE 676 METAL SOFFIT, SEE FINISH SCHEDULE
683 ACOUSTICAL CLOUD KIT
812 BUILT-UP ROOFING
952 MECHANICAL EQUIPMENT, SEE MECHANICAL
SCALE:1/ 8" = 1'-0"A4.1
B1 BUILDING SECTION
SCALE:1/8" = 1'-0"A4.1
D1 BUILDING SECTION
NOTES
SCALE:1/ 8" = 1'-0"A4.1
A1 BUILDING SECTION
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 243 of 357
FINISH FLOOR
0' -0"
FINISH FLOOR
0' - 0"
T.O.P. 2
16' -6"
91 RESTROOM
101
RECEPTION
103
RESTROOM
104
HALL
102
FITNESS
126
WOMEN'S
128
PATIO
A4.5
D4
A4.6
D1
OFFICE D1
111
621675621675676621
952
120120
684674
908
FINISH FLOOR
0' -0"
FINISH FLOOR
0' -0"
T.O.P. 2
16' -6"
T.O.P. 3
21' -9"
T.O.P. 3
21' -9"
861
HALL
102
A4.6
D3
A4.6
D4
MULTI-PURPOSE
112
STORAGE
114
COPY/MAIL
ROOM
115
HALL
122
MEN'S
129
WASH ROOM
131
BREAK ROOM
125
986
1. 2.
3. 4.
5. 6.
NOTES AND DETAILS APPLY TO ALL SECTIONS U.N.O.
FOR FINISH SCHEDULE SEE A6.1.
PROVIDE R-30 BATT INSULATION AT ROOF CAVITY.
PROVIDE R-13 BATT INSULATION AT EXTERIOR WALLS.
PROVIDE SOUND ATTENUATION BATT INSULATION AT INTERI OR
WALLS.
MATERIALS EXPOSED WITHIN THE PLENUM SHALL BE
NONCOMBUSTABLE PER CMC 602.2 (FLAME SPREAD INDEX
NOT TO EXCEED 25 AND SMOKE DEVELOPED INDEX NOT TO
EXCEED 50). SEE WALL SECTIONS AND A7.8.
FINISH FLOOR
0' -0"
FINISH FLOOR
0' -0"
T.O.P. 2
16' -6"
T.O.P. 3
21' -9"
JCD
OPEN WORK
STATIONS
117
A4.5
D1
COPY/MAIL
ROOM
115
RECEIVING
116
RESTROOM
101
LOBBY
100
OFFICE E1
134
683 674
T.O.S.
13' - 6 1/2"
T.O.S.
10' - 2 1/4"
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
BUILDING
SECTIONS
200102
A4.2
BC
JK
KG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/8" = 1'-0"A4.2
B1 BUILDING SECTION
SCALE:1/8" = 1'-0"A4.2
D1 BUILDING SECTION
NOTES
SCALE:1/8" = 1'-0"A4.2
A1 BUILDING SECTION
CONSTRUCTION NOTES
120 ALTERNATE BID ITEM 2: PLANTING AREA, SEE LANDSCAPE
621 GYPSUM BOARD CEILING, SEE FINISH SCHEDULE
674 EXPOSED STRUCTURE
675 ACOUSTICAL CEILING TILE AND GRID, SEE FINISH SCHEDULE 676 METAL SOFFIT, SEE FINISH SCHEDULE
683 ACOUSTICAL CLOUD KIT
684 ACOUSTICAL PANEL ATTACHED TO UNDERSIDE OF STRUCTURE, SEE FINISH
SCHEDULE
908 AIR INTAKE, SEE MECHANICAL
952 MECHANICAL EQUIPMENT, SEE MECHANICAL
986 PACKAGED ROOFTOP UNIT, SEE MECHANICAL
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 244 of 357
T.O.P. 1
13' -6"
FINISH FLOOR
0' - 0"
B
T.O.S.
12' -6"
PLYWOOD CRICKET
PLYWOOD SHEATHING, SEE
STRUCTURAL
ROOF JOIST, SEE STRUCTURAL
CONCRETE FOOTING, SEE
STRUCTURAL
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL
VAPOR BARRIER
SAND, SEE STRUCTURAL
BUILT-UP ROOF, SEE FINISH
SCHEDULE
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
VERTICAL METAL SIDING,
SEE FINISH SCHEDULE
PREFINISHED PARAPET
FLASHING
2X WOOD STUD, PER
PLAN
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
STOREFRONT SYSTEM, SEE
STOREFRONT SCHEDULE
ALTERNATE BID ITEM 2:
PLANTING AREA, SEE
LANDSCAPE
FITNESSEXTERIOR
METAL PANEL SYSTEM, SEE
FINISH SCHEDULE
A7.4
A3
A7.7
B1
CONCRETE MOW
CURB, SEE
LANDSCAPE
PLYWOOD SHEATHING, SEE
STRUCTURAL
PLYWOOD SHEATHING, SEE
STRUCTURAL
J-MOLD AT UNFINISHED
CEILING STRUCTURE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
A7.8
D2
FINISH FLOOR
0' -0"
T.O.P. 2
16' - 6"
C
PREFINISHED PARAPET
FLASHING
WOMEN'S
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PLYWOOD CRICKET
GYPSUM BOARD
CEILING, SEE FINISH
SCHEDULE
HORIZONTAL METAL
SIDING OVER BUILDING
PAPER, SEE FINISH
SCHEDULE
2X WOOD STUD, PER
PLAN
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL
EXTERIOR
SAND, SEE STRUCTURAL
VAPOR BARRIER
CONCRETE FOOTING, SEE
STRUCTURAL
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
ALTERNATE BID ITEM 2:
PLANTING AREA, SEE
LANDSCAPE
FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
T.O.S.
13' - 6 1/2"
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
GYPSUMBOARDGYPSUMBOARD
PLYWOOD SHEATHING,
SEE STRUCTURAL
A7.4
A2
PLYWOOD SHEATHING, SEE
STRUCTURAL
A7.4
B2
BUILT-UP ROOF, SEE FINISH
SCHEDULE
FINISH FLOOR
0' -0"
T.O.P. 2
16' - 6"
G J
PREFINISHED PARAPET
FLASHING
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PLYWOOD CRICKET
PLYWOOD SHEATHING,
SEE STRUCTURAL
ROOF JOIST, SEE
STRUCTURAL
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
MEN'S LOCKER EXTERIOR
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL
GYPSUM BOARD
CEILING, SEE FINISH
SCHEDULE
2X FRAMING, SEE
STRUCTURAL
METAL SOFFIT, SEE FINISH
SCHEDULE
SAND, SEE STRUCTURAL
VAPOR BARRIER
CONCRETE FOOTING, SEE
STRUCTURAL
HORIZONTAL METAL
SIDING OVER BUILDING
PAPER, SEE FINISH
SCHEDULE
METAL PANEL SYSTEM, SEE
FINISH SCHEDULE
CONCRETE SLAB ON
GRADE, SEE CIVIL AND
LANDSCAPE
VERTICAL METAL SIDING
OVER BUILDING PAPER,
SEE FINISH SCHEDULE
T.O.S.
13' - 9 1/2"
GYPSUMBOARDGYPSUMBOARD
A7.4
A2
A7.7
B1
PLYWOOD SHEATHING, SEE
STRUCTURAL
PLYWOOD SHEATHING, SEE
STRUCTURAL
A7.7
A4
A7.4
B2
BUILT-UP ROOF, SEE FINISH
SCHEDULE
2X FRAMING, SEE
STRUCTURALA7.8
D1
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
WALL SECTIONS
200102
A4.3
BC
JK
GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3/4" = 1'-0"A4.3
D4 WALL SECTION
SCALE:3/4" = 1'-0"A4.3
D1 WALL SECTION
SCALE:3/4" = 1'-0"A4.3
D2 WALL SECTION
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 245 of 357
FINISH FLOOR
0' - 0"
T.O.P. 2
16' - 6"
T.O.P. 3
21' - 9"
C D
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL
SAND, SEE STRUCTURAL
VAPOR BARRIER
CONCRETE FOOTING, SEE
STRUCTURAL
BREAK ROOM
WOOD HEADER, SEE STRUCTURAL
METAL SOFFIT, SEE FINISH SCHEDULE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PREFINISHED PARAPET FLASHING
PREFINISHED PARAPET FLASHING
VERTICAL METAL SIDING, SEE FINISH
SCHEDULE
2X WOOD STUD, PER PLAN
HORIZONTAL METAL SIDING OVER
BUILDING PAPER, SEE FINISH
SCHEDULE
2X WOOD STUD, PER PLAN
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
EXTERIOR
VERTICAL METAL SIDING, SEE FINISH
SCHEDULE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
WOOD HEADER, SEE STRUCTURAL
T.O.S.
13' - 6"
PLYWOOD CRICKET
PLYWOOD SHEATHING,
SEE STRUCTURAL
A7.4
A2
A7.4
A4
PLYWOOD SHEATHING, SEE
STRUCTURAL
A7.7
A3
PLYWOOD SHEATHING,
SEE STRUCTURAL
J-MOLD AT UNFINISHED CEILING
STRUCTURE
A7.4
B2
A7.4
C4
BUILT-UP ROOF, SEE FINISH
SCHEDULE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
FINISH FLOOR
0' - 0"
T.O.P. 2
16' -6"
J
CONCRETE SLAB ON GRADE, SEE
STRUCTURAL
SAND, SEE STRUCTURAL
VAPOR BARRIER
CONCRETE FOOTING, SEE
STRUCTURAL
PLYWOOD CRICKET
PLYWOOD SHEATHING, SEE
STRUCTURAL
OFFICE D1 EXTERIOR
PREFINISHED PARAPET
FLASHING
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
ROOF JOIST, SEE STRUCTURAL
STOREFRONT SYSTEM, SEE
STOREFRONT SCHEDULE
HORIZONTAL METAL
SIDING OVER BUILDING
PAPER, SEE FINISH
SCHEDULE
2X FRAMING, SEE
STRUCTURAL
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
METAL PANEL EYEBROW, SEE FINISH
SCHEDULE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
T.O.S.
13' - 6 1/2"
ACOUSTICAL CEILING TILE AND
GRID, SEE FINISH SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
A7.4
A2
A7.8
C4
PLYWOOD SHEATHING, SEE
STRUCTURAL
CONCRETE SLAB ON
GRADE, SEE CIVIL
A7.4
B2
BUILT-UP ROOF, SEE FINISH
SCHEDULE
HORIZONTAL METAL SIDING, SEE
FINISH SCHEDULE
A7.7
B1
A7.8
D1
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
WALL SECTIONS
200102
A4.4
BC
JK
GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3/ 4" = 1'-0"A4.4
D2 WALL SECTION
SCALE:3/4" = 1'-0"A4.4
D1 WALL SECTION
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 246 of 357
FINISH FLOOR
0' - 0"
T.O.P. 3
21' -9"
C D
LOBBY RESTROOM RECEIVING
GYPSUM BOARD
CEILING, SEE FINISH
SCHEDULE
ACOUSTICAL CEILING
TILE AND GRID, SEE FINISH
SCHEDULE
DOOR AS SCHEDULED
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
2X WOOD STUD, PER
PLAN
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
2X WOOD STUD, PER
PLAN
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL
EXTERIOR
SAND, SEE STRUCTURAL
VAPOR BARRIER
CONCRETE FOOTING, SEE
STRUCTURAL
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
VERTICAL METAL SIDING,
SEE FINISH SCHEDULE
ALTERNATE BID ITEM 2:
PLANTING AREA, SEE
LANDSCAPE
MECHANICAL
DUCTWORK, SEE
MECHANICAL, TYP
FINISH AS OCCURS, SEE
INTERIOR ELEVATIONS
AND FINISH SCHEDULE
METAL PANEL SYSTEM, SEE
FINISH SCHEDULE
METAL PANEL SYSTEM, SEE
FINISH SCHEDULE
WOOD HEADER, SEE
STRUCTURAL
STOREFRONT SYSTEM, SEE
STOREFRONT SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
A7.4
A4
PLYWOOD SHEATHING, SEE
STRUCTURAL
PLYWOOD SHEATHING, SEE
STRUCTURAL2X6STUDPERPLAN
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
T.O.S.
22' - 0 1/2"
T.O.S.
20' - 0 1/2"
A7.4
C4
BUILT-UP ROOF, SEE FINISH
SCHEDULE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
FINISH FLOOR
0' -0"
T.O.P. 2
16' - 6"
1 WOMEN'S
2X WOOD STUD, PER PLAN
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
GYPSUM BOARD
CEILING, SEE FINISH
SCHEDULE
2X WOOD STUD, PER PLAN
EXTERIOR
PREFINISHED PARAPET
FLASHING
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL
METAL PANEL SYSTEM, SEE
FINISH SCHEDULE
HORIZONTAL METAL
SIDING OVER BUILDING
PAPER, SEE FINISH
SCHEDULE
FINISH AS OCCURS, SEE
ROOM FINISHSCHEDULECONCRETESLABONGRADE, SEE
CIVIL
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
A7.4
A2
PLYWOOD SHEATHING, SEE
STRUCTURAL
PLYWOOD SHEATHING, SEE
STRUCTURAL
PLYWOOD SHEATHING, SEE
STRUCTURAL
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
VAPOR BARRIER
SAND, SEE STRUCTURAL
CONCRETE
FOOTING, SEE
STRUCTURAL
A7.4
B2
BUILT-UP ROOF, SEE FINISH
SCHEDULE
A7.8
D4
SIM
A7.8
D1
A7.7
B1
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
WALL SECTIONS
200102
A4.5
BC
JK
GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3/4" = 1'-0"A4.5
D1 WALL SECTION
SCALE:3/4" = 1'-0"A4.5
D4 WALL SECTION
SIM
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 247 of 357
FINISH FLOOR
0' - 0"
9 RESTROOM
GYPSUM BOARD CEILING, SEE
FINISH SCHEDULE
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL
SAND, SEE STRUCTURAL
CONCRETE FOOTING, SEE
STRUCTURAL
STOREFRONT SYSTEM, SEE
STOREFRONT SCHEDULE
EXTERIOR
VAPOR BARRIER
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
A7.5
B3
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
METAL PANEL SYSTEM, SEE
FINISH SCHEDULE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
ROOF JOIST, SEE STRUCTURAL
METAL PANEL SYSTEM, SEE
FINISH SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
WOOD BEAM, SEE
STRUCTURAL
R-30 BATT INSULATION,
TYP.
2X6 ROOF JOIST, SEE
STRUCTURAL
HSS BEAM, SEE
STRUCTURAL
FINISH AS OCCURS, SEE ROOM
FINISH SCHEDULE
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
A7.5
B1
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
FINISH FLOOR
0' -0"
T.O.P. 2
16' - 6"
1 WASHROOMEXTERIOR
GYPSUM BOARD
CEILING, SEE FINISH
SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
VERTICAL METAL SIDING,
SEE FINISH SCHEDULE
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL
2X WOOD STUD, PER
PLAN
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
METAL PANEL SYSTEM, SEE
FINISH SCHEDULE
HORIZONTAL METAL
SIDING OVER BUILDING
PAPER, SEE FINISH
SCHEDULE
SAND, SEE STRUCTURAL
CONCRETE FOOTING, SEE
STRUCTURAL
VAPOR BARRIER
CONCRETE SLAB ON
GRADE, SEE CIVIL AND
LANDSCAPE
PREFINISHED PARAPET FLASHING
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
A7.4
A2
PLYWOOD SHEATHING,
SEE STRUCTURAL
FINISH AS OCCURS, SEE ROOM
FINISH SCHEDULE
A7.4
B2
BUILT-UP ROOF, SEE FINISH
SCHEDULE
A7.7
B1
A7.8
D1
FINISH FLOOR
0' -0"
T.O.P. 3
21' - 9"
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL
COPY/MAIL
ROOM
ACOUSTICAL CEILING
TILE AND GRID, SEE FINISH
SCHEDULE
EXTERIOR
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
2X WOOD STUD, PER
PLAN
VERTICAL METAL SIDING,
SEE FINISH SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
PREFINISHED PARAPET
FLASHING
CONCRETE SLAB ON
GRADE, SEE CIVIL AND
LANDSCAPE
SAND, SEE STRUCTURAL
VAPOR BARRIER
CONCRETE FOOTING, SEE
STRUCTURAL
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
A7.4
A4
PLYWOOD SHEATHING,
SEE STRUCTURAL
A7.5
D3
2X BRACING, SEE
STRUCTURAL
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
BUILT-UP ROOF, SEE
FINISH SCHEDULE
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
WALL SECTIONS
200102
A4.6
BC
JK
GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3/4" = 1'-0"A4.6
D1 WALL SECTION
SCALE:3/4" = 1'-0"A4.6
D3 WALL SECTION
SCALE:3/4" = 1'-0"A4.6
D4 WALL SECTION
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 248 of 357
4 HORIZONTAL METAL
SIDING OVER BUILDING
PAPER, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
2X6 STUD PER PLAN
BATT INSULATION
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
INTERIOREXTERIOR
VERTICAL METAL SIDING
OVER BUILDING PAPER,
SEE FINISH SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
PLYWOOD SHEATHING,
SEE STRUCTURAL
2X6 STUD PER PLAN
BATT INSULATION
8 INTERIOREXTERIOR
5 HORIZONTAL METAL
SIDING OVER BUILDING
PAPER, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
2X6 STUD PER PLAN
FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BATT INSULATION
INTERIOREXTERIOR
6 HORIZONTAL METAL
SIDING OVER BUILDING
PAPER, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
2X6 STUD PER PLAN
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BATT INSULATION
INTERIOREXTERIOR
1 8" CMU, SEE STRUCTURAL
EXTERIOREXTERIOR
2 METAL PANEL SYSTEM
OVER BUILDING PAPER,
SEE FINISH SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
PLYWOOD SHEATHING,
SEE STRUCTURAL
METAL PANEL SYSTEM
OVER BUILDING PAPER,
SEE FINISH SCHEDULE
2X12 STUD PER PLAN
EXTERIOREXTERIOR
7 VERTICAL METAL SIDING
OVER BUILDING PAPER,
SEE FINISH SCHEDULE
2X6 STUD PER PLAN
BATT INSULATION
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
INTERIOREXTERIOR
PLYWOOD SHEATHING,
SEE STRUCTURAL
3 BATT INSULATION
METAL PANEL SYSTEM
OVER BUILDING PAPER,
SEE FINISH SCHEDULE
2X12 STUD PER PLAN
INTERIOREXTERIOR
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
PLYWOOD SHEATHING, SEE
STRUCTURAL
PLYWOOD SHEATHING, SEE
STRUCTURAL
9 2X4 STUD PER PLAN
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BATT INSULATION
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
NOTE: NO BATT INSULATION AT
130 MEN'S LOCKER DOUBLE WALL
10 GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BATT INSULATION
2X4 STUD PER PLAN
NOTE: NO BATT INSULATION AT
DOUBLE WALL
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
WALL TYPES
200102
A4.7
BC
JK
MM, GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 249 of 357
11 2X4 STUD PER PLAN
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BATT INSULATION
FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
14 GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
2X6 STUD PER PLAN
BATT INSULATION
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
15 FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
2X6 STUD PER PLAN
BATT INSULATION
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
13 BATT INSULATION
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
2X6 STUD PER PLAN
FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BATT INSULATION
12 GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
PLYWOOD SHEATHING,
SEE STRUCTURAL
2X4 STUD PER PLAN
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
16 PLYWOOD SHEATHING,
SEE STRUCTURAL
2X6 STUD PER PLAN
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BATT INSULATION
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
18 GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
2X8 STUD PER PLAN
BATT INSULATION
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
19 FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
2X8 STUD PER PLAN
BATT INSULATION
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
20 GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
2X8 STUD PER PLAN
BATT INSULATION
PLYWOOD SHEATHING, SEE
STRUCTURAL
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
WALL TYPES
200102
A4.8
BC
JK
KG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
17 NOT USED
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 250 of 357
FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
2X8 STUD PER PLAN
PLYWOOD SHEATHING,
SEE STRUCTURAL
BATT INSULATION
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
21 2X6 STUD PER PLAN
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
FINISH AS OCCURS, SEE
ROOM FINISH SCHEDULE
22 ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
WALL TYPES
200102
A4.9
BC
JK
KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 251 of 357
CG
98 A1
A5.1
1 2
3 4
RESTROOM
101
TYP.
056
18 X
6 0
C
LR
30"X48"
CLR
902
ø
5' -
0"
753
762
760
546
763
752
TYP.
056
753
763
TYP.
056767759752635
620
638760
4'-
4"
B1
A5.1
5 6
7 8
RESTROOM
104
18 X
6 0
C
LR
30 X
4 8
CL
R
762
TYP.
056
760
902
ø
5' -
0"
753763
635
620
638
4'-
4"
760
753
TYP.
056763 767
TYP.
056759
8 D1
A5.1
10 CONFERENCE
106
618702 546
30"X48"
CLR
11 18
X
6 0
C
LR
18 X
6 0
C
LR
702
618
2 EQ)
3'-4"
W/ EQUIPMENT
VERIFY
764
638
620
1"
2'-
0"
3'-
6"
A7.9
A2
A7.9
TYP.
A3
650
546
638
620
932
TYP.
987
6 EQ)
8'-9"1"A7.9
TYP.
A3
A7.9
B3
EQ EQ
373
C1
A5.1
9 COPY
105
618 702
764
TYP.
932984
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ENLARGED
PLANS &
INTERIOR
ELEVATIONS
200102
A5.1
BC
JK
AS
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
CONSTRUCTION NOTES
056 GRAB BAR, SEE D3/T-3 AND T-4
373 WALL MOUNTED TV, PROVIDE BLOCKING, SEE DETAIL A1/ A7.10 546 SINK, SEE PLUMBING AND T-4
618 COUNTERTOP, SEE FINISH SCHEDULE
620 GYPSUM BOARD, SEE ROOM FINISH SCHEDULE FOR TYPE
635 WAINSCOT, SEE FINISH SCHEDULE
638 WALL BASE WHERE OCCURS, SEE ROOM FINISH SCHEDULE
650 COUNTERTOP AND BACKSPLASH, SEE FINISH SCHEDULE
702 BUILT-IN CASEWORK, SEE FINISH SCHEDULE
752 BABY CHANGING STATION, SEE T-3
753 MIRROR, SEE T-3
759 TOILET PAPER DISPENSER, SEE T-3
760 PAPER TOWEL DISPENSER AND WASTE RECEPTACLE, SEE T-3 762 TOILET, SEE PLUMBING AND T-3
763 SOAP DISPENSER
764 COPY MACHINE, OFOI
767 TOILET SEAT COVER DISPENSER, SEE T-3
902 FLOOR DRAIN, SEE PLUMBING
932 LIGHT FIXTURE, SEE ELECTRICAL
984 RETURN GRILLE, SEE MECHANICAL
987 DUCTWORK, SEE MECHANICAL
SCALE:1/ 4" = 1'-0"A5.1
A1 101 - RESTROOM - ENLARGED PLAN AND INTERIOR ELEVATIONS 2 341
SCALE:1/ 4" = 1'-0"A5.1
B1 104 - RESTROOM - ENLARGED PLAN AND INTERIOR ELEVATIONS 5 6 7 8
SCALE:1/4" = 1'-0"A5.1
D1 106 - CONFERENCE - ENLARGED PLAN AND INTERIOR ELEVATIONS 9 10
SCALE:1/ 4" = 1'-0"A5.1
C1 105 - COPY - ENLARGED PLAN AND INTERIOR ELEVATIONS
11 FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 252 of 357
CG
CG
CG
CG
E
8 A1
A5.2
1 2
COPY/MAIL
ROOM
115
TYP.
618
TYP.
702 764765
18"X60" CLR
18 X
6 0
C
LR
618
764765
2 EQ)
4'-0"
W/ EQUIPMENT
VERIFY
TYP.
638
702
620
1"
713
2'-
6"
3'-
0"
A7.9
B4
OPEN
5 EQ)
9'-2"1"
702 618
2'-
0"
3'-
6"
A7.9
A2
A7.9
TYP.
A3
6 D
D1
A5.2
6 5
4 BREAK ROOM
125
618
650
546
TYP.
514
702
10'-10"
620
650
TYP.
987
932
2 EQ)
1'-10"
TYP.
514
984
546
4 EQ)
6'-10"
A7.9
TYP.
A3
A7.9
B3
638
7 EQ)
14'-0"
EQEQ
373
A7.9
TYP.
A3
984
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ENLARGED
PLANS &
INTERIOR
ELEVATIONS
200102
A5.2
BC
JK
AS
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1/ 4" = 1'-0"A5.2
A1 115 - MAIL - ENLARGED PLAN AND INTERIOR ELEVATIONS
1 2
SCALE:1/4" = 1'-0"A5.2
D1 125 - BREAKROOM - ENLARGED PLAN AND INTERIOR ELEVATIONS 4 5
6 CONSTRUCTION NOTES
373 WALL MOUNTED TV, PROVIDE BLOCKING, SEE DETAIL A1/ A7.10 514 REFRIGERATOR, OFOI
546 SINK, SEE PLUMBING AND T-4
618 COUNTERTOP, SEE FINISH SCHEDULE
620 GYPSUM BOARD, SEE ROOM FINISH SCHEDULE FOR TYPE
638 WALL BASE WHERE OCCURS, SEE ROOM FINISH SCHEDULE
650 COUNTERTOP AND BACKSPLASH, SEE FINISH SCHEDULE
702 BUILT-IN CASEWORK, SEE FINISH SCHEDULE
713 BUILT-IN MAIL SLOTS
764 COPY MACHINE, OFOI
765 SHREDDER, OFOI
932 LIGHT FIXTURE, SEE ELECTRICAL
984 RETURN GRILLE, SEE MECHANICAL
987 DUCTWORK, SEE MECHANICAL
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 253 of 357
CG
CG
CG
CG
CG
6 B
A1
A5.3
1 2
3 4
FITNESS
126
18 X
6 0
C
LR
991
620
TYP.
932 987
TYP.
402
575
638
394
394
766
984 984
373
TYP.
766991
394 394
OPEN
978
634
8'-
0 056
620
TYP.
638
TYP.
601
3'-
4 786
TYP.
546
618
TYP.
753
TYP.
712
TYP.
711
635
6'-
6 A7.9
B2763
OPEN
767 056
4'-
4 759 538 978
974
6"
40 573
41 B
D1
A5.3
6 5
8 7
WOMEN'S
128
TYP.
546538
30"X48"
CLR
618
18 X
6 0
C
LR
18"X60"
CLR
30 X
48 C
LR
30"X48"
CLR
ø
5' -
0"
30"X48"
CLR
712
TYP.
711
TYP.
710
56"X60"
CLR
D1
A5.3
10 D1
A5.3
9 978
30"X60"
CLR
TYP.
056
759
30"X48"
CLR
095
TYP.
786
611611
611 611
611
611
611
611
611611
611
611
611 763
573
OPEN OPEN
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ENLARGED
PLANS &
INTERIOR
ELEVATIONS
200102
A5.3
BC
JK
AS
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
CONSTRUCTION NOTES
056 GRAB BAR, SEE D3/T-3 AND T-4
095 ACCESSIBLE PERSONNEL LOCKER, PROVIDE BLOCKING. SEE A1/ A7.10 373 WALL MOUNTED TV, PROVIDE BLOCKING, SEE DETAIL A1/ A7.10 394 WALL MOUNTED FAN, PROVIDE BLOCKING, SEE DETAIL A1/ A7.10 402 STOREFRONT, TYP.
538 TOILET PARTITION
546 SINK, SEE PLUMBING AND T-4
573 RECESSED SOLID SURFACE SHOWER SHELF
575 SEE RCP
601 CORNER GUARD
611 ACCENT PAINT, SEE FINISH SCHEDULE
618 COUNTERTOP, SEE FINISH SCHEDULE
620 GYPSUM BOARD, SEE ROOM FINISH SCHEDULE FOR TYPE
634 FULL HEIGHT PANEL, SEE ROOM FINISH SCHEDULE
635 WAINSCOT, SEE FINISH SCHEDULE
638 WALL BASE WHERE OCCURS, SEE ROOM FINISH SCHEDULE
710 SHOWER CURTAIN AND CURTAIN ROD
711 ACCESSIBLE BENCH
712 PERSONNEL LOCKER, PROVIDE BLOCKING. SEE DETAIL A1/ A7.10 753 MIRROR, SEE T-3
759 TOILET PAPER DISPENSER, SEE T-3
760 PAPER TOWEL DISPENSER AND WASTE RECEPTACLE, SEE T-3 763 SOAP DISPENSER
766 MIRROR, SEE B3/A7.10 AND B4/A7.10
767 TOILET SEAT COVER DISPENSER, SEE T-3
786 ROBE HOOK
932 LIGHT FIXTURE, SEE ELECTRICAL
974 ACCESSIBLE SHOWER HEAD, SEE PLUMBING AND A3/T-4
978 ACCESSIBLE SHOWER SEAT
984 RETURN GRILLE, SEE MECHANICAL
987 DUCTWORK, SEE MECHANICAL
991 HYDRATION SYSTEM, SEE PLUMBING AND ELECTRICAL
SCALE:1/4" = 1'-0"A5.3
A1 126 - FITNESS - ENLARGED PLAN AND INTERIOR ELEVATIONS 1 2
3 4
5 6
7 8
SCALE:1/4" = 1'-0"A5.3
D1 128 - WOMEN'S - ENLARGED PLAN AND INTERIOR ELEVATIONS 9 10
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 254 of 357
CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
538635
620
4'-
4 TYP.
767
TYP.
056 638
OPEN
OPEN
761
TYP.
056
TYP.
767
TYP.
760
G
F
3 6A1A5.4
3 1
24 A1
A5.4
5 MEN'S LOCKER
130
30"X48"
CLR
618
TYP.
546
ø
5' -
0"
978
MEN'S
129
18 X
6 0
C
LR
56"X60"
CLR
36"X60"
CLR
30"X48"
CLR
30"X60"
CLR
TYP.
767
TYP.
056
TYP.
759
18 X
60 C
LR
30"X48"
CLR
30"X48"
CLR
30"X48"
CLR
30"X48" CLR
095
TYP.
786
970
611
611611611
611
611
611611611
611611611
611611
611
611611
611
611
611
611
611611
611611
611761611
611
611
A1
A6.3
14 TYP.
763
573
573
TYP.
712
TYP.
753
618
TYP.
546 056 978 638
8'-
0 974 634970
786
3'-
4 A7.9
B2
TYP.
573
40 6"
6'-
6 TYP.
763 601
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ENLARGED
PLANS &
INTERIOR
ELEVATIONS
200102
A5.4
BC
JK
AS
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
1 2
3 4
SCALE:1/4" = 1'-0"A5.4
D1 130 - MEN'S LOCKER - ENLARGED PLAN AND INTERIOR ELEVATIONS 5 CONSTRUCTION NOTES
056 GRAB BAR, SEE D3/T-3 AND T-4
095 ACCESSIBLE PERSONNEL LOCKER, PROVIDE BLOCKING. SEE A1/ A7.10 538 TOILET PARTITION
546 SINK, SEE PLUMBING AND T-4
573 RECESSED SOLID SURFACE SHOWER SHELF
601 CORNER GUARD
611 ACCENT PAINT, SEE FINISH SCHEDULE
618 COUNTERTOP, SEE FINISH SCHEDULE
620 GYPSUM BOARD, SEE ROOM FINISH SCHEDULE FOR TYPE
634 FULL HEIGHT PANEL, SEE ROOM FINISH SCHEDULE
635 WAINSCOT, SEE FINISH SCHEDULE
638 WALL BASE WHERE OCCURS, SEE ROOM FINISH SCHEDULE
712 PERSONNEL LOCKER, PROVIDE BLOCKING. SEE DETAIL A1/ A7.10 753 MIRROR, SEE T-3
759 TOILET PAPER DISPENSER, SEE T-3
760 PAPER TOWEL DISPENSER AND WASTE RECEPTACLE, SEE T-3 761 URINAL SCREEN, SEE A3/T-3
763 SOAP DISPENSER
767 TOILET SEAT COVER DISPENSER, SEE T-3
786 ROBE HOOK
970 SHOWER HEAD, SEE PLUMBING
974 ACCESSIBLE SHOWER HEAD, SEE PLUMBING AND A3/T-4
978 ACCESSIBLE SHOWER SEAT
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 255 of 357
ABBR DESCRIPTION
ACT SUSPENDED ACOUSTICAL CEILING TILE
CONCRETECNC
CONCRETE MASONRYUNITCMU
CERAMICTILECT
EXPOSEDSTRUCTUREEXP
GYPSUM WALL BOARD (5/ 8" UON)GWB
GWB-2
GWBWR
PLASTICLAMINATEPL
PAINTPT
1/ 2" PLYWOOD, PAINTEDPLYWD
QUARTZCOUNTERTOPQTZ
RUBBERMATRM
WOODWD
GYPSUM WALL BOARD, SOUND ABSORBENT (5/ 8" UON)
GYPSUM WALL BOARD, WATER RESISTANT (5/8" UON)
MATERIAL LEGEND
SOLIDSURFACESSU
FIBERGLASS REINFORCEDPLASTICFRP
METALMTL
PHENOLIC TOILETCOMPARTMENTSPTC
RUBBERBASERB
GWBWR-2 GYPSUM WALL BOARD, WATER RESISTANT,
SOUND ABSORBANT (5/8" UON)
BUR BUILT UP ROOF
ACP ACOUSTICAL CEILING PANEL
GLAZINGGL
1 NOT USED
2 PAINT FINISH: SEMI-GLOSS
3 REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL
INFORMATION
4 OPEN TO SLOPING STRUCTURE ABOVE. PAINT EXPOSED
PIPING, DUCT WORK AND INSULATION
5 PROVIDE GWBWR AT ALL RESTROOM WALLS
6 PROVIDE GWBWR SUBSTRATE AT ALL SSU
7 PROVIDE PLYWOOD BACKBOARD, SEE ELECTRICAL
8 SOLID SURFACE 8'-0" FULL HEIGHT PANEL IN SHOWER
9 WAINSCOT TO BE 4'-4" AFF U.O.N ON INTERIOR
ELEVATIONS
10 PROVIDE 12" HIGH RUBBER MAT BASE
11 ACOUSTICAL CLOUD KIT, SEE A2.3 FOR REFLECTED
CEILING PLAN
12 ACOUSTICAL CEILING PANEL, SEE A2.3 FOR REFLECTED
CEILING PLAN
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
FINISH
SCHEDULES
200102
A6.1
BC
JK
GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
ROOM FINISH SCHEDULE
ROOMS FLOOR BASE WAINSCOT WALLS CEILING CASEWORK
REMARKSNUMBERDESCRIPTIONMATERIALCOLORMATERIALCOLORMATERIALCOLOR
NORTH EAST SOUTH WEST
MATERIAL COLOR HEIGHT COUNTERTOP COLOR CABINETCOLORMATERIALCOLORMATERIALCOLORMATERIALCOLORMATERIALCOLOR 100 LOBBY CNC CNC-1 RB RB-1 GL - GL - GWB PT-1 GWB PT-1 GWB PT-4 20' - 0" 101 RESTROOM CNC CNC-1 SSU SSU-2 SSU SSU-1 GWBWR-2 PT-2 GWBWR PT-2 GWBWR-2 PT-2 GWBWR PT-2 GWB PT-4 10' - 0"2, 3, 5, 6, 9 102 HALL CNC CNC-1 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ACT ACT-1 10' - 0" 103 RECEPTION CNC CNC-1 RB RB-1 GWB-2 PT-1 GWB-2 PT-1 GWB-2 PT-1 GWB-2 PT-1 ACT ACT-1 10' - 0" 104 RESTROOM CNC CNC-1 SSU SSU-2 SSU SSU-1 GWBWR-2 PT-2 GWBWR PT-2 GWBWR-2 PT-2 GWBWR-2 PT-2 GWB PT-4 10' - 0"2, 3, 5, 6, 9 105 COPY CNC CNC-1 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ACT ACT-1 10' - 0" QTZ QTZ-1 PL PL-1 3 106 CONFERENCE CNC CNC-1 RB RB-1 GWB / GL PT-1 GWB / GL PT-1 GWB PT-1 GWB PT-2 PT-5 10' - 0" QTZ QTZ-1 PL PL-1 3, 4, 11 107 OFFICE B CNC CNC-1 RB RB-1 GWB / GL PT-1 GWB-2 PT-1 GWB-2 PT-1 GWB-2 PT-1 ACT ACT-1 10' - 0" 108 OFFICE C1 CNC CNC-1 RB RB-1 GWB / GL PT-1 GWB PT-1 GWB-2 PT-1 GWB-2 PT-1 ACT ACT-1 10' - 0" 109 OFFICE C1 CNC CNC-1 RB RB-1 GWB / GL PT-1 GWB PT-1 GWB / GWB-2 PT-1 GWB PT-1 ACT ACT-1 10' - 0" 110 OFFICE C1 CNC CNC-1 RB RB-1 GWB / GWB-2 PT-1 GWB-2 PT-1 GWB-2 PT-1 GWB PT-1 ACT ACT-1 10' - 0" 111 OFFICE D1 CNC CNC-1 RB RB-1 GWB PT-1 GWB-2 PT-1 GWB-2 PT-1 GWB / GWB-2 PT-1 ACT ACT-1 10' - 0" 112 MULTI-PURPOSE CNC CNC-1 RB RB-1 GWB PT-1 GWB PT-2 GWB PT-1 GWB PT-1 ACT ACT-1 10' - 0" 113 STORAGE CNC CNC-2 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ACT ACT-1 10' - 0" 114 STORAGE CNC CNC-2 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ACT ACT-1 10' - 0" 115 COPY/MAIL ROOM CNC CNC-1 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ACT ACT-1 10' - 0" QTZ QTZ-1 PL PL-1 3 116 RECEIVING CNC CNC-1 RB RB-1 GWB PT-1 GL - GWB PT-1 GWB PT-1 ACT ACT-1 10' - 0" 117 OPEN WORK STATIONS CNC CNC-1 RB RB-1 GWB PT-1 GWB PT-1 / PT-2 GWB PT-1 / PT-2 GWB PT-1 / PT-2 PT-5 10' - 0"4, 11 118 SERVER CNC CNC-2 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ACT ACT-1 10' - 0"7 119 OFFICE D1 CNC CNC-1 RB RB-1 GWB-2 PT-1 GWB / GL PT-1 GWB-2 PT-1 GWB-2 PT-1 ACT ACT-1 9' - 1" 120 OFFICE D1 CNC CNC-1 RB RB-1 GWB PT-1 GWB / GL PT-1 GWB / GL PT-1 GWB-2 PT-1 ACT ACT-1 9' - 1" 121 OFFICE D1 CNC CNC-1 RB RB-1 GWB-2 PT-1 GWB-2 PT-1 GWB / GL PT-1 GWB / GWB-2 PT-1 ACT ACT-1 9' - 1" 122 HALL CNC CNC-1 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ACT ACT-1 10' - 0" 123 STORAGE CNC CNC-2 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 ACT ACT-1 10' - 0" 124 JAN CNC CNC-2 RB RB-1 FRP FRP-1 GWB PT-1 GWB PT-1 GWBWR PT-1 GWBWR PT-1 GWB PT-4 10' - 0"2, 9 125 BREAK ROOM CNC CNC-1 RB RB-1 GWB / GL PT-1 GWB PT-1 GWB PT-2 GWB PT-1 PT-5 10' - 0" QTZ QTZ-1 PL PL-1 3, 4 126 FITNESS RM RM-1 RM RM-1 GWB / GL PT-1 GWB / GL PT-1 GWB PT-1 GWB PT-1 PT-5 10' - 0"3, 4, 10, 12 127 HWH CNC CNC-2 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-4 10' - 0"2 128 WOMEN'S CNC CNC-1 SSU SSU-1, SSU-2 SSU SSU-1 GWBWR / SSU PT-1 GWBWR PT-1 GWBWR / SSU PT-1 GWBWR / SSU PT-1 GWB PT-4 10' - 0" QTZ QTZ-1 2, 3, 5, 6, 8, 9 129 MEN'S CNC CNC-1 SSU SSU-2 SSU SSU-1 GWBWR PT-1 GWBWR PT-1 GWBWR PT-1 GWBWR PT-1 GWB PT-4 10' - 0"2, 3, 5, 6, 9 130 MEN'S LOCKER CNC CNC-1 SSU SSU-1, SSU-2 SSU SSU-1 GWBWR / SSU PT-1 GWBWR / SSU PT-1 GWBWR / SSU PT-1 GWBWR PT-1 GWB PT-4 10' - 0" QTZ QTZ-1 2, 3, 5, 6, 8, 9 131 WASH ROOM CNC CNC-1 RB RB-1 FRP FRP-1 GWBWR PT-1 GWBWR PT-1 GWBWR PT-1 GWB PT-1 GWB PT-4 10' - 0"2, 9 132 ELECTRICAL CNC CNC-2 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 PT-5 10' - 0"2, 4, 7 133 FR CNC CNC-2 RB RB-1 GWB PT-1 GWB PT-1 GWB PT-1 GWB PT-1 PT-5 8' - 0"2, 4 134 OFFICE E1 CNC CNC-1 RB RB-1 GWB-2 PT-1 GWB-2 PT-1 GWB PT-1 GWB-2 PT-1 ACT ACT-1 9' - 1" 135 OFFICE E1 CNC CNC-1 RB RB-1 GWB-2 PT-1 GWB PT-1 GWB PT-1 GWB-2 PT-1 ACT ACT-1 9' - 1" 136 OFFICE E1 CNC CNC-1 RB RB-1 GWB-2 PT-1 GWB PT-1 GWB PT-1 GWB-2 PT-1 ACT ACT-1 9' - 1" 137 OFFICE E1 CNC CNC-1 RB RB-1 GWB-2 PT-1 GWB PT-1 GWB PT-1 GWB-2 PT-1 ACT ACT-1 9' - 1" 138 OFFICE E1 CNC CNC-1 RB RB-1 GWB-2 PT-1 GWB PT-1 GWB PT-1 GWB-2 PT-1 ACT ACT-1 9' - 1" 139 OFFICE E1 CNC CNC-1 RB RB-1 GWB-2 PT-1 GWB PT-1 GWB PT-1 GWB-2 PT-1 ACT ACT-1 9' - 1" 140 OFFICE E1 CNC CNC-1 RB RB-1 GWB-2 PT-1 GWB-2 PT-1 GWB-2 PT-1 GWB-2 PT-1 ACT ACT-1 9' - 0"
FINISH NOTES
FINISH SCHEDULE
MATERIAL TYPE
DESCRIPTION
LOCATIONNAMEMANUFACTURERSTYLECOLOR
ACP 1 ACOUSTIC CEILING PANEL ARMSTRONG TACTUM DIRECT-ATTACHED PT-5 ACOUSTIC CEILING PANEL, SEE REFLECTED CEILING PLAN ACT 1 ACOUSTIC CEILING TILE ARMSTRONG ULTIMA WHITE SEE ROOM FINISH SCHEDULE ACT 2 ACOUSTIC CEILING TILE ARMSTRONG OPTIMA WHITE ACOUSTICAL CLOUD KIT, SEE REFLECTED CEILING PLAN BUR 1 BUILT UP ROOF THE GARLAND COMPANY STRESSPLY IV MINERAL WHITE ROOF CMU 1 CONCRETE MASONRY UNIT (SEALED) RCP BLOCK & BRICK PRECISION (8x8x16) CHARCOAL PATIO WALL CMU 2 CONCRETE MASONRY UNIT CAP (SEALED) RCP BLOCK & BRICK PRECISION (2x8x16) CHARCOAL PATIO WALL CNC 1 CONCRETE (POLISHED)SMOOTH FINISH - INTERIOR STANDARD GREY FLOORING, SEE ROOM FINISH SCHEDULE CNC 2 CONCRETE (SEALED)SMOOTH FINISH - INTERIOR STANDARD GREY FLOORING, SEE ROOM FINISH SCHEDULE CNC 3 CONCRETE (COLORED) DAVIS COLORS - DARK GRAY (IRON OXIDE) 860 COLORED CONCRETE WALKWAY, SEE LANDSCAPE FF 1 FACTORY FINISH ARCADIA - STANDARD DARK BRONZE AB-7 STOREFRONT AND WINDOW FRP 1 FIBERGLASS REINFORCED PLASTIC MARLITE STANDARD FRP P470N - DARK GREY WAINSCOT, SEE ROOM FINISH SCHEDULE GL 1 STOREFRONT GLAZING VITRO SOLARBAN 70 GLASS OPTIGRAY + CLEAR SEE STOREFRONT SCHEDULE GL 2 INTERIOR STOREFRONT AND WINDOW GLAZING SEE WINDOW AND STOREFRONT SCHEDULES MCM 1 METAL COMPOSITE MATERIAL ALUCOBOND ALUCOBOND PLUS BEIGE EXTERIOR SOFFIT, SEE EXTERIOR ELEVATIONS MTL 2 METAL SIDING AEP SPAN FLEX SERIES 1.2FX20-12 ZINC GRAY EXTERIOR SOFFIT, SEE EXTERIOR ELEVATIONS MTL 3 METAL SIDING AEP SPAN FLEX SERIES 1.2FX10-12 REGAL BLUE EXTERIOR SOFFIT, SEE EXTERIOR ELEVATIONS MTL 4 METAL - FACTORY FINISH ARCADIA - STANDARD DARK BRONZE AB-7 WINDOW, STOREFRONTS, COVER CAP PL 1 PLASTIC LAMINATE WILSONART 60 MATTE MANITOBA MAPLE (7911-60) CASEWORK, SEE ROOM FINISH SCHEDULE PT 1 PAINT SHERWIN WILLIAMS EGGSHELL SW7656 - RHINESTONE INTERIOR FIELD PAINT, SEE ROOM FINISH SCHEDULE PT 2 PAINT SHERWIN WILLIAMS EGGSHELL SW2821 - DOWNING STONE INTERIOR ACCENT PAINT, SEE ROOM FINISH SCHEDULE AND FLOOR/ENLARGED PLANS PT 3 PAINT SHERWIN WILLIAMS EGGSHELL SW2848 - ROYCROFT PEWTER INTERIOR HOLLOW METAL DOORS AND FRAMES PT 4 PAINT SHERWIN WILLIAMS EGGSHELL SW7007 - CEILING BRIGHT WHITE LIGHT CEILING PAINT, SEE ROOM FINISH SCHEDULE PT 5 PAINT SHERWIN WILLIAMS EGGSHELL SW2848 - ROYCROFT PEWTER DARK CEILING PAINT, SEE ROOM FINISH SCHEDULE PT 6 PAINT SHERWIN WILLIAMS SEMI-GLOSS MATCH MTL-2 SEE DOOR SCHEDULE PT 7 PAINT SHERWIN WILLIAMS SEMI-GLOSS MATCH MTL-3 SEE DOOR SCHEDULE PTC 1 PHENOLIC TOILET COMPARTMENTS BRADLEY CORP PHENOLIC CORE COMPARTMENTS GRAPHITE GRAFIX RESTROOM PARTITIONS QTZ 1 QUARTZ COUNTERTOP WILSONART - Q1009 - GREY LAKE COUNTERTOPS, AND INTERIOR WINDOW SILL RB 1 RUBBER BASE TARKETT TOPSET 282 VAPORIZE WALL BASE, SEE ROOM FINISH SCHEDULE RM 1 RUBBER MAT MONDO SPORT IMPACT DARK GREY - S018 FITNESS FLOOR AND WALL BASE SSU 1 SOLID SURFACE AVONITE 1/4" THICK POLARIS - 8256 RESTROOM WAINSCOT, SHOWER FULL HEIGHT PANEL AND WALL BASE SSU 2 SOLID SURFACE AVONITE 1/2" THICK POLARIS - 8256 WALL BASE AT SSU WAINSCOT SSU 3 SOLID SURFACE SWANSTONE WHITE (010)SHOWER PAN
WD 1 WOOD DOOR MASONITE ARCHITECTURAL ASPIRO SERIES ROTARY CUT NATURAL BIRCH COCOA BEAN WOOD DOORS VARIES
VARIES
VARIES
VARIES
VARIES
VARIES
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 256 of 357
1 PROVIDE ISA SYMBOL ON DOOR, SEE B2/T-6
2 TOILET ROOM ISA SIGNAGE AND TEXT ON WALL
ADJACENT TO DOOR, SEE T-3
3 PROVIDE EXIT SIGNAGE, SEE D3/T-6
4 PROVIDE EXIT ROUTE SIGNAGE, SEE D3/T-6
5 PROVIDE EGRESS DECAL, SEE D1/A7.10
6 PROVIDE ROOM IDENTIFICATION SIGNAGE, VERIFY TEXT
WITH OWNER, SEE B3/T-6
7 FIRE CONTROL ROOM IDENTIFICATION SIGNAGE, VERIFY
TEXT WITH OWNER, SEE B3/T-6
8 PROVIDE ACCESS CONTROL, SEE ELECTRICAL
9 SEE STOREFRONT SCHEDULE ON A6.3
10 SEE MECHANICAL FOR DOOR LOUVER MINIMUM NET
FREE AREA REQUIREMENT
11 PROVIDE ELECTRIC LOCK SET, SEE ELECTRICAL
12 PROVIDE ELECTRIC STRIKE, SEE ELECTRICAL
13 PROVIDE 3/ 4" DOOR UNDERCUT, SEE MECHANICAL
14 PROVIDE GL-1
15 PROVIDE MOMENTARY SWITCH AT INTERIOR RECEPTION
COUNTER
A B C D
H
W W
H
W
6"6"
1'-
0"
H
W
E F G
FF
3'-
8"
6"6"
TG
H
TG
H
W
3'-
8"
9"
4"2'-1"
6"6"
TG
H
H
W
SC
HED.
SEE
DO
O
R
SCHED.
SEE DOOR
SCHED.
SEE DOOR
4" MIN.
TG
W
6"6"
H
1'-
0"
1'-
6"
6"
I
TG
SCHED.
SEE DOOR
SC
HED.
SEE
DO
O
RTG
H
W
9"
3'-
8"
6"
1'-
0"
1'-
0"
4"2'-1"
4" MIN.
J
W
H
H
W
A
FF
2'-
10"
TG TG
W
H
1'-
0"
1'-
6"
6"
6" 6"
TG TG
6"
6"6"
1 PROVIDE TEMPERED GLASS AT ROOM
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
DOOR AND
WINDOW
SCHEDULE
200102
A6.2
BC
JK
KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
DOOR SCHEDULE
DOOR FRAME DETAIL
HARDWARE
GROUPREMARKSMARKTYPEWIDTHHEIGHTELEVDEPTHMATERIALFINISH
COLOR
INT/EXT
LOUVER
SIZE HOUR MATERIAL FINISH
COLOR
INT/EXT HEAD JAMB THRESHOLD
100A SINGLE 3' - 0" 7' - 10" D 0' - 1 3/4" AL/GL MTL MTL-4 AL MTL MTL-4 A1/ A7.2 B1/A7.2 D1/A7.2 01A 1, 3, 5, 8, 9, 11, 14 101A SINGLE 3' - 0" 7' - 0" A 0' - 1 3/ 4" WD STN WD-1 HM PT PT-3 A3/ A7.1 B3/A7.1 C2/A7.1 05 2 102A SINGLE 3' - 0" 7' - 0" D 0' - 1 3/4" HM/GL HM PT-3/PT-7 HM PT PT-3/PT-7 A2/ A7.1 B2/A7.1 C1/A7.1 01B 3, 5, 8, 11, 14 102B SINGLE 3' - 0" 7' - 0" B 0' - 1 3/4" WD STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 01D 4, 8, 11, 15 103A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 18 104A SINGLE 3' - 0" 7' - 0" A 0' - 1 3/ 4" WD STN WD-1 HM PT PT-3 A3/ A7.1 B3/A7.1 C2/A7.1 05 2 106A SINGLE 3' - 0" 7' - 10" C 0' - 1 3/4" AL/GL MTL MTL-4 AL MTL MTL-4 A1/ A7.2 B1/A7.2, C1/A7.2 D1/A7.2 01C 8, 9, 11, 14 106B SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 18 107A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 17 8, 12 108A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 06 109A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 06 110A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 06 111A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 06 112A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 18 113A SINGLE 3' - 0" 7' - 0" A 0' - 1 3/ 4" WD STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 17 8, 12 114A SINGLE 3' - 0" 7' - 0" A 0' - 1 3/ 4" WD STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 15 116A SINGLE 3' - 0" 7' - 8" B 0' - 1 3/4" AL/GL MTL MTL-4 AL MTL MTL-4 B4/A7.1 C1/A7.2 D1/A7.2 01B 3, 5, 8, 11, 14 116B SINGLE 3' - 0" 7' - 0" B 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 17A 8, 12 116C SINGLE 3' - 0" 7' - 0" B 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 10 4, 8, 12 117A SINGLE 3' - 0" 7' - 8" D 0' - 1 3/4" AL/GL MTL MTL-4 AL MTL MTL-4 B4/A7.1 B1/A7.2 D1/A7.2 01C 3, 5, 8, 9, 11, 14 117B SINGLE 3' - 0" 7' - 8" D 0' - 1 3/4" AL/GL MTL MTL-4 AL MTL MTL-4 B4/A7.1 B1/A7.2 D1/A7.2 01C 3, 5, 8, 9, 11, 14 118A SINGLE 3' - 0" 7' - 0" A 0' - 1 3/ 4" WD STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 17 8, 12 119A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 06 120A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 06 121A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 06 122A SINGLE 3' - 0" 7' - 0" B 0' - 1 3/4" HM/GL PT PT-3/PT-7 HM PT PT-3/PT-7 A2/ A7.1 B2/A7.1 C1/A7.1 04B 3, 5, 8, 11, 14 123A PAIR 6' - 0" 7' - 0" F 0' - 1 3/ 4" WD STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 02A 124A SINGLE 3' - 0" 7' - 0" A 0' - 1 3/ 4" WD STN WD-1 HM PT PT-3 A3/ A7.1 B3/A7.1 C2/A7.1 11 13 125A PAIR 6' - 0" 7' - 10" G 0' - 1 3/4" AL/GL MTL MTL-4 AL MTL MTL-4 A1/ A7.2 B1/A7.2 D1/A7.2 01 3, 5, 8, 9, 11, 14 125B SINGLE 3' - 0" 7' - 0" B 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 18 126A PAIR 6' - 0" 7' - 10" G 0' - 1 3/4" AL/GL MTL MTL-4 AL MTL MTL-4 A1/ A7.2 B1/A7.2 D1/A7.2 01 3, 5, 8, 9, 11, 14 126B SINGLE 3' - 0" 7' - 0" E 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C3/A7.1 14 127A PAIR 6' - 0" 7' - 0" F 0' - 1 3/ 4" WD STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 02A 128A SINGLE 3' - 0" 7' - 0" A 0' - 1 3/ 4" HM PT PT-3/PT-7 HM PT PT-3/PT-7 A2/ A7.1 B2/A7.1 C1/A7.1 04D 2, 8, 11 128B SINGLE 3' - 0" 7' - 0" A 0' - 1 3/ 4" WD STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 10A 2 129A SINGLE 3' - 0" 7' - 0" A 0' - 1 3/ 4" WD STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 10A 2 130A SINGLE 3' - 0" 7' - 0" A 0' - 1 3/ 4" HM PT PT-3/PT-7 HM PT PT-3/PT-7 A2/ A7.1 B2/A7.1 C1/A7.1 04B 2, 8, 11 131A SINGLE 3' - 0" 7' - 0" E 0' - 1 3/4" HM PT PT-3/PT-7 HM PT PT-3/PT-7 A2/ A7.1 B2/A7.1 C1/A7.1 04A 8, 11, 14 131B SINGLE 3' - 0" 7' - 0" I 0' - 1 3/4" WD/GL STN WD-1 18"x12" HM PT PT-3 A3/ A7.1 B3/A7.1 C2/A7.1 10A 10 132A PAIR 6' - 0" 7' - 0" H 0' - 1 3/4" HM PT PT-3/PT-7 12"x12" HM PT PT-3/PT-7 A2/ A7.1 B2/A7.1 C1/A7.1 04C 6, 8, 10, 11 133A PAIR 6' - 0" 7' - 0" F 0' - 1 3/ 4" HM PT PT-3/PT-6 HM PT PT-3/PT-6 A1/ A7.1 B1/A7.1 C1/A7.1 04C 7, 8, 11 134A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 06 135A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 06 136A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 06 137A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 06 138A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 06 139A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A4/ A7.1 A4/ A7.1 C2/A7.1 06 140A SINGLE 3' - 0" 7' - 0" C 0' - 1 3/4" WD/GL STN WD-1 HM PT PT-3 A3/ A7.1 A3/ A7.1 C2/A7.1 06 G-01 GATE 3' - 2" 5' - 6" SEE B3/A1.5 0' - 1 1/2" STL STL G1 8, 11 G-02 GATE 3' - 2" 5' - 6" SEE B3/A1.5 0' - 1 1/2" STL STL G1 8, 11 G-03 GATE 3' - 2" 5' - 6" SEE B3/A1.5 0' - 1 1/2" STL STL G1 G-04 SINGLE 2' - 6" 5' - 0" J 0' - 2 1/ 8" STL AL A1/ A7.3 B1/A7.3 C1/A7.3
WINDOW SCHEDULE
WINDOW FRAME DETAILS GLAZING
REMARKSMARKWIDTHHEIGHTTYPEGLAZINGMATERIALFINISHCOLORHEADJAMBSILL MAX
SHGC
MIN
U-VALUE
A 4' - 0" 4' - 0" HORIZ SLIDER GL-2 AL MTL MTL-4 A4/ A7.3 B4/A7.3 C4/A7.3 1
DOOR NOTES
WINDOW NOTES
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 257 of 357
SEE DOOR
SCHEDULE
AA
9'-
0 10'-3 3/ 8"
3'-11 3/ 8" 3'-0"3'-4"
4'-
8 TG TG
TG
TG TG
TGTG1'-
2 3'-
2 GL
1 MTL
4 TYP.
TYP.
TG TG
SEE DOOR
SCHEDULE
TGTG
BB
TG
3'-
6 3'-
2 2 1/4"3'-0"6"4'-7 3/ 8"5'-1"5'-0"5'-1 3/ 4"
23'-6 3/8"
16 7
1 4
7 1
4 1'-
0 EQ
EQ
EQ
EQ
20 8
1 4
TG
TG
TG
TG
TG
STOREFRONT CAP, TYP.
4'-
1 0
7'-
8 TYP.
MTL
4 CC
5'-1"4'-8"4'-8"5'-1"4'-8"4'-10 3/ 8"
29'-0 3/ 8"
EQ
EQ
EQ
EQ
6'-
0 3'-
0 11
3 4
STOREFRONT CAP, TYP.
SEE DOOR
SCHEDULE
SEE DOOR
SCHEDULE
TG TG
TG TG
DD
TGTG
6'-
0 3'-
0 3'-0" 1'-11"5'-4"5'-1"5'-4"5'-1"5'-4"5'-1"5'-4"5'-1"5'-4"5'-1"5'-4"5'-0"2'-4"3'-0"5'-5"5'-10" TG
TG
TG
TG
TG
TG
TG
TG
11 3
4 5'-9"5'-6"
STOREFRONT CAP, TYP.
95'-2"
EQ
EQ
EQ
EQ
KK
5'-10"5'-7"3'-0"4'-11"4'-6"4'-7 1/ 2"4'-4"4'-1"4'-1"4'-6"4'-3 7/ 8" 49'-9 3/ 8"
3'-
2 4'-
8 1'-
2 9'-
0 TG TGTG TG TG TG TG TG TG TG
TGTG
TG
SEE DOOR
SCHEDULE
TG TG
HH
8'-
0 3'-0"
3'-
2 4'-
10 TG
SEE DOOR
SCHEDULE
GG
13'-8"
3'-10"6'-0"3'-10"
3'-
2 4'-
8 2'-
2 TG TG
TG
10 0
TG TG
TG TG
FF
9'-
0 4'-9 3/ 8"5'-0"
3'-
2 4'-
8 1'-
2 9'-9 3/ 8"
TG TG
EE
SEE DOOR
SCHEDULE
3'-
2 4'-
8 1'-
2 21'-11 3/8"
5'-9"6'-0"5'-0"5'-2 3/ 8"
9'-
0 TG TG TG
TG TG
TG TG TG
1 PROVIDE TEMPERED GLASS AT ROOM
2 WATERPROOFING AROUND WINDOW, SEE D1/A7.1
3 PROVIDE ROLLER SHADES
MM
8'-
0 3'-2"2'-10"
6'-0"
4'-
10 3'-
2 TG TG
GL
2 GL
2 GL
2 GL
2 10'-0"
EQ EQ
NN
3'-
8 4'-
4 GL
2 GL
2 LL
TG TG
1'-
2 4'-
8 3'-
2 9'-
0 9'-4 3/8"
4'-7"4'-9 3/ 8"
GLAZING - ACID ETCH
GLAZING
TG
JJ
8'-
0 4'-
10 3'-
2 3'-0"
GL
2 GL
2 OO
6'-
0 3'-
0 EQ
EQ
EQ
2'-1 3/ 8"
STOREFRONT CAP,
TYP.
11 3
4 EQ
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
STOREFRONT
SCHEDULE
200102
A6.3
BC
JK
MM, KG, KD
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
STOREFRONT SCHEDULE
MARK
STOREFRONT FRAME GLAZING DETAILS
REMARKSWIDTHHEIGHTMATERIALFINISHCOLORTYPEMIN. SHGC
MIN.
U-VALUE HEAD JAMB SILL MULLION
AA 10' - 3 3/8" 9' - 0" AL MTL MTL-4 GL-1 0.27 0.29 A3/ A7.2 B4/A7.2, D1/A7.3 D2/A7.2 C3/A7.2, D3/A7.2 1, 2, 3 BB 23' - 6 3/8" 20' - 9 1/2" AL MTL MTL-4 GL-1 0.27 0.29 A3/ A7.2 A4/ A7.2, B3/A7.2, B4/A7.2, C4/A7.2 D2/A7.2 C3/A7.2, C4/A7.2, D3/A7.2, D4/A7.2 1, 2, 3 CC 29' - 0 3/8" 6' - 0" AL MTL MTL-4 GL-1 0.27 0.29 A3/ A7.2 A4/ A7.2, B3/A7.2, B4/A7.2 C2/A7.2 C3/A7.2, D4/A7.2 2, 3 DD AL MTL MTL-4 GL-1 0.27 0.29 A3/ A7.2 C4/A7.1, A4/A7.2, B4/A7.2 C2/A7.2, D2/A7.2 C3/A7.2, D4/A7.2 1, 2, 3 EE 21' - 11 3/8" 9' - 0" AL MTL MTL-4 GL-1 0.27 0.29 A3/ A7.2 B3/A7.2, B4/A7.2 D2/A7.2 C3/A7.2, D3/A7.2 1, 2, 3 FF 9' - 9 3/8" 9' - 0" AL MTL MTL-4 GL-1 0.27 0.29 A3/ A7.2 B3/A7.2, B4/A7.2 D2/A7.2 C3/A7.2, D3/A7.2 1, 2, 3 GG 13' - 8" 10' - 0" AL MTL MTL-4 GL-1 0.27 0.29 A2/ A7.2 B2/A7.2 D2/A7.2 C3/A7.2, D3/A7.2 1, 2, 3 HH 3' - 0" 8' - 0" AL MTL MTL-4 GL-1 0.27 0.29 A2/ A7.2 B2/A7.2 D2/A7.2 D3/A7.2 1, 2, 3 JJ 3' - 0" 8' - 0" AL MTL MTL-4 GL-2 A2/ A7.3 B2/A7.3, C2/A7.3 D2/A7.3 D4/A7.3 1, 3 KK 49' - 9 3/8" 9' - 0" AL MTL MTL-4 GL-1 0.27 0.29 A3/ A7.2 B3/A7.2, B4/A7.2 D2/A7.2 C3/A7.2, D3/A7.2 1, 2, 3 LL 9' - 4 3/8" 9' - 0" AL MTL MTL-4 GL-1 0.27 0.29 A3/ A7.2 B2/A7.2, B4/A7.2, A4/ A7.2 D2/A7.2 C3/A7.2, D3/A7.2 1, 2, 3 MM 6' - 0" 8' - 0" AL MTL MTL-4 GL-2 A3/ A7.3 B3/A7.3, C2/A7.3 D2/A7.3 C3/A7.3, D4/A7.3 1, 3 NN 10' - 0" 3' - 8" AL MTL MTL-4 GL-2 A3/ A7.3 B3/A7.3 D3/A7.3 C3/A7.3 3 OO 2' - 1 3/8" 6' - 0" AL MTL MTL-4 GL-1 0.27 0.29 A3/ A7.2 B2/A7.2, B4/A7.2, D1/A7.3 (SIM) D2/A7.2 D4/A7.3 2, 3 FF
FF
STOREFRONT NOTES
FF
FF
95' - 2"
STOREFRONT LEGEND
9' - 0"
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 258 of 357
DOOR AS SCHEDULED
1/ 8" THICK ALUMINUM
DOOR FRAME
1" LONG STAINLESS
STEEL COUNTERSUNK
SCREWS, TYP
R1/
4"
1"1"
10"
1"
GLAZING
METAL VISION LITE FRAME, PAINT TO
MATCH DOOR FRAME
DOOR AS SCHEDULED
GLAZING
METAL VISION LITE FRAME PAINT TO
MATCH DOOR FRAME
DOOR AS SCHEDULED
EXTERIOR GLAZING
INTERIOR GLAZING
NOTE: FIRE GLAZING REQUIRED
AT RATED DOORS
INTERIOR EXTERIOR
1/2"
DOOR AS SCHEDULED
ALUMINUM THRESHOLD SET IN
MASTIC OVER SELF-ADHESIVE
MEMBRANE
CONCRETE SLAB ON GRADE, SEE
CIVIL
SEALANT AND BACKER ROD, TYP
DOOR FRAME BEYOND
RO
1/
2"
M
AX.1/
4"
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL.
FINISH AS SCHEDULED
WATERPROOF SEALER AT OPENING
AND 4" BEYOND OPENING
4 CORNER REINFORCEMENT AT ALL
CORNERS TYPICAL AT DOORS AND
WINDOWS
REFERENCE DOOR AND WINDOW SCHEDULE
SEE WALL TYPES
VARIES
RO
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
WOOD HEADER, SEE
STRUCTURAL
SEALANT, BOTH SIDES
DOOR FRAME AS SCHEDULED
DOOR ASSCHEDULEDDOORFRAMEBEYOND
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
SEE WALL TYPES
VARIES
RO
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
WOOD HEADER, SEE STRUCTURAL
SEALANT, BOTH SIDES
DOOR FRAME AS SCHEDULED
DOOR AS SCHEDULED
DOOR FRAME BEYOND
PLYWOOD SHEATHING, SEE
STRUCTURAL
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
DOOR AS SCHEDULED
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
DOOR FRAME AS SCHEDULED
SEALANT, BOTH SIDES
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
RO
WAINSCOT WHERE OCCURS,
SEE FINISH SCHEDULE
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
WOOD FRAMING, SEE
STRUCTURAL
DOOR ASSCHEDULEDDOORFRAMEBEYOND
RO
FINISH FLOOR, SEE ROOM
FINISH SCHEDULE
DOOR ASSCHEDULEDDOORFRAMEBEYOND
FINISH FLOOR, SEE ROOM
FINISH SCHEDULE
UNIVERSAL REDUCER,
NO.146
RO
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL.
FINISH AS SCHEDULED
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
INTERIOR EXTERIOR
RO
GYPSUM BOARD WHERE OCCURS,
SEE FINISH SCHEDULE FOR TYPE
SEALANT
DOOR FRAME AS SCHEDULED
DOOR FRAME BEYOND
DOOR AS SCHEDULED
PREFINISHED METAL FLASHING
PANEL CLIP PER MANUFACTURER'S
RECOMMENDATION
CLOSURE PER MANUFACTURER'S
RECOMMENDATION
WOOD HEADER, SEE STRUCTURAL
PLYWOOD SHEATHING, SEE
STRUCTURAL
BUILDING PAPER
METAL SIDING, SEE FINISH SCHEDULE
SEALANT AND BACKER ROD, TYP
FLASHING TAPE PER
MANUFACTURER'S
RECOMMENDATION
WATERPROOFING, SEE
D1/A7.1
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
INTERIOR EXTERIOR
RO
GYPSUM BOARD WHERE OCCURS,
SEE FINISH SCHEDULE FOR TYPE
SEALANT
DOOR FRAME AS SCHEDULED
DOOR FRAME BEYOND
DOOR AS SCHEDULED
PREFINISHED METAL FLASHING
SHIM PER MANUFACTURER'S
RECOMMENDATION
Z-METAL PER MANUFACTURER'S
RECOMMENDATION
WOOD HEADER, SEE STRUCTURAL
PLYWOOD SHEATHING, SEE
STRUCTURAL
BUILDING PAPER
METAL SIDING, SEE FINISH SCHEDULE
SEALANT AND BACKER ROD, TYP
FLASHING TAPE PER
MANUFACTURER'S
RECOMMENDATION
WATERPROOFING, SEE
D1/A7.1
RO
EXTERIOR
INTERIOR
PLYWOOD SHEATHING,
SEE STRUCTURAL
BUILDING PAPER
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
WOOD FRAMING, SEE STRUCTURAL
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
DOOR AS SCHEDULED
DOOR FRAME AS SCHEDULED
SEALANT AND BACKER ROD, TYP
SEALANT
PREFINISHED METAL TRIM
PANEL CLIP PER MANUFACTURER'S
RECOMMENDATION
METAL SIDING, SEE FINISH SCHEDULE
CLOSURE PER MANUFACTURER'S
RECOMMENDATION
SEALANT PER MANUFACTURER'S
RECOMMENDATION
WATERPROOFING, SEE
D1/A7.1
RO
EXTERIOR
INTERIOR
PLYWOOD SHEATHING,
SEE STRUCTURAL
BUILDING PAPER
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
WOOD FRAMING, SEE STRUCTURAL
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
DOOR AS SCHEDULED
DOOR FRAME AS SCHEDULED
SEALANT AND BACKER ROD, TYP
SEALANT
PREFINISHED METAL TRIM
METAL SIDING, SEE FINISH SCHEDULE
Z-METAL PER MANUFACTURER'S
RECOMMENDATION
SEALANT PER MANUFACTURER'S
RECOMMENDATION
WATERPROOFING, SEE
D1/A7.1
STOREFRONT SYSTEM
BEYOND, TYP
INTERIOR EXTERIOR
GLAZING, TYP
DOOR AS SCHEDULED
STOREFRONT AS
SCHEDULED
STOREFRONT COVER CAP
AS SCHEDULED
EXTERIOR
INTERIOR
STOREFRONT SYSTEM
BEYOND, TYP
GLAZING
STOREFRONT AS
SCHEDULED
INTERIOR
COMPRESSION GASKET,
TYP
DOOR FRAME AS
SCHEDULED
1/8" ALUMINUM BREAK
METAL TO MATCH
STOREFRONT SYSTEM
1/8" ALUMINUM BREAK
METAL TO MATCH
STOREFRONT SYSTEM
1/ 8" ALUMINUM BREAK
METAL TO MATCH
STOREFRONT SYSTEM
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
DOOR &
STOREFRONT
DETAILS
200102
A7.1
BC
JK
GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:1 1/2" = 1'-0"A7.1
D3 DOOR - KICK PLATE
SCALE:3" = 1'-0"A7.1
D4 DOOR - GLAZING
SCALE:3" = 1'-0"A7.1
C1 EXTERIOR DOOR - THRESHOLD
SCALE:3" = 1'-0"A7.1
D1 WATER PROOFING
SCALE:3" = 1'-0"A7.1
A3 INTERIOR DOOR - HEAD / JAMB
SCALE:3" = 1'-0"A7.1
A4 INTERIOR DOOR - HEAD / JAMB
SCALE:3" = 1'-0"A7.1
B3 INTERIOR DOOR - JAMB
SCALE:3" = 1'-0"A7.1
C2 INTERIOR DOOR - THRESHOLD
SCALE:3" = 1'-0"A7.1
C3 INTERIOR DOOR - THRESHOLD
SCALE:3" = 1'-0"A7.1
A2 EXTERIOR DOOR - HEAD AT MTL-3
SCALE:3" = 1'-0"A7.1
A1 EXTERIOR DOOR - HEAD AT MTL-2
SCALE:3" = 1'-0"A7.1
B1 EXTERIOR DOOR - JAMB AT MTL-2
SCALE:3" = 1'-0"A7.1
B2 EXTERIOR DOOR - JAMB AT MTL-3
SCALE:3" = 1'-0"A7.1
B4 STOREFRONT DOOR WITH CAP - HEAD
SCALE:3" = 1'-0"A7.1
C4 STOREFRONT - JAMB AT WALL
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 259 of 357
EXTERIORINTERIOR
GLAZING, TYP
STOREFRONT AS SCHEDULED
DOOR AS SCHEDULED
STOREFRONT SYSTEM
BEYOND, TYP
EXTERIOR
INTERIOR
STOREFRONT AS SCHEDULED
STOREFRONT SYSTEM
BEYOND, TYP
DOOR AS SCHEDULED
GLAZING, TYP
EXTERIORINTERIOR
GLAZING, TYP
STOREFRONT AS SCHEDULED
SEALANT AND BACKER
ROD, TYP
CONCRETE SLAB ON
GRADE/LANDSCAPE AREA, SEE
CIVIL AND LANDSCAPE
STOREFRONT SYSTEM
BEYOND, TYP
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL.
FINISH AS SCHEDULED
EXTERIORINTERIOR
STOREFRONT AS SCHEDULED
GLAZING, TYP
STOREFRONT SYSTEM
BEYOND, TYP
EXTERIORINTERIOR
STOREFRONT AS
SCHEDULED
STOREFRONT SYSTEM
BEYOND, TYP
STOREFRONT COVER CAP
AS SCHEDULED
GLAZING, TYP
EXTERIOR
INTERIOR
STOREFRONT AS SCHEDULED
STOREFRONT SYSTEM
BEYOND, TYP
DOOR AS SCHEDULED
GLAZING, TYP
SHIM AS REQUIRED, TYP
SEALANT AND BACKER
ROD, TYP
COLUMN, SEE
STRUCTURAL
1/ 8" ALUMINUM BREAK
METAL TO MATCH
STOREFRONT SYSTEM
EXTERIORINTERIOR
GLAZING, TYP
STOREFRONT AS SCHEDULED
SEALANT AND BACKER
ROD, TYP
STOREFRONT SYSTEM
BEYOND, TYP
METAL BEAM, SEE STRUCTURAL
1/ 8" ALUMINUM BREAK METAL TO
MATCH STOREFRONTSYSTEMSHIMASREQUIRED, TYP
EXTERIOR
INTERIOR
STOREFRONT AS SCHEDULED
STOREFRONT SYSTEM
BEYOND, TYPGLAZING, TYP
EXTERIOR
INTERIOR
PLYWOOD SHEATHING,
SEE STRUCTURAL
BUILDING PAPER
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
METAL SIDING, SEE FINISH
SCHEDULE
ZEE FLASHING PER
MANUFACTURER'S
RECOMMENDATION
SEALANT PER MANUFACTURER'S
RECOMMENDATION
SEALANT AND BACKER
ROD, TYP
WOOD BLOCKING
SHIM AS REQUIRED
STOREFRONT SYSTEM
BEYOND, TYP
STOREFRONT AS SCHEDULED
WATERPROOFING, SEE
D1/A7.1
PREFINISHED METAL TRIM
EXTERIOR
INTERIOR
STOREFRONT AS SCHEDULED
STOREFRONT SYSTEM
BEYOND, TYP
SHIM AS REQUIRED, TYP
SEALANT AND BACKER
ROD, TYP
COLUMN, SEE
STRUCTURAL
INTERIOR
GLAZING, TYP
1/ 8" ALUMINUM BREAK
METAL TO MATCH
STOREFRONT SYSTEM
NEOPRENE STRIP
EXTERIORINTERIOR
SHIM AS REQUIRED, TYP
SEALANT AND BACKER
ROD, TYP
COLUMN, SEE
STRUCTURAL
1/ 8" ALUMINUM BREAK
METAL TO MATCH
STOREFRONT SYSTEM
STOREFRONT SYSTEM
BEYOND, TYP
STOREFRONT AS SCHEDULED
GLAZING, TYP
EXTERIOR
BATT INSULATION, SEE BUILDING
SECTIONS AND WALL TYPES
INTERIOR EXTERIOR
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
WOOD BLOCKING
STOREFRONT AS SCHEDULED PREFINISHED METAL FLASHING
PANEL CLIP PER MANUFACTURER'S
RECOMMENDATION
CLOSURE PER MANUFACTURER'S
RECOMMENDATION
PLYWOOD SHEATHING, SEE
STRUCTURAL
BUILDING PAPER
METAL SIDING, SEE FINISH SCHEDULE
SEALANT AND BACKER ROD, TYP
FLASHING TAPE PER
MANUFACTURER'S
RECOMMENDATION
WATERPROOFING, SEE D1/A7.1
WOOD HEADER, SEE
STRUCTURAL
STOREFRONT SYSTEM
BEYOND, TYP
WALL BEYOND, TYP
GLAZING, TYP
EXTERIORINTERIOR
1/2"
1/
4"
CONCRETE SLAB ON
GRADE, SEE STRUCTURAL.
FINISH AS SCHEDULED CONCRETE SLAB ON
GRADE, SEE CIVIL
ALUMINUM THRESHOLD
SET IN MASTIC OVER
SELF-ADHESIVE
MEMBRANE
SEALANT AND BACKER
ROD
PEMKO DOOR SWEEP
DOOR AS SCHEDULED
STOREFRONT SYSTEM
BEYOND, TYP
GLAZING, TYP
FINISH FLOOR, SEE ROOM
FINISH SCHEDULE
EXTERIOR
INTERIOR
PLYWOOD SHEATHING,
SEE STRUCTURAL
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
SEALANT AND BACKER
ROD, TYP
WOOD BLOCKING
SHIM AS REQUIRED
STOREFRONT SYSTEM
BEYOND, TYP
STOREFRONT AS SCHEDULED
WATERPROOFING, SEE
D1/A7.1
BREAK METAL, COLOR TO
MATCH STOREFRONT
COLUMN, SEE STRUCTURAL
INTERIOR EXTERIOR
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
WOOD BLOCKING
STOREFRONT AS SCHEDULED SEALANT AND BACKER ROD, TYP
WOOD HEADER, SEE
STRUCTURAL
STOREFRONT SYSTEM
BEYOND, TYP
WALL BEYOND, TYP
GLAZING, TYP
WATERPROOFING, SEE D1/A7.1
BREAK METAL, COLOR TO MATCH
STOREFRONT
PLYWOOD SHEATHING, SEE
STRUCTURAL
WOOD FRAMING, SEE
STRUCTURAL
WOOD BLOCKING
EXTERIORINTERIOR
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
STOREFRONT SYSTEM
BEYOND, TYP
WALL BEYOND, TYP
METAL SIDING, SEE FINISH
SCHEDULE
GLAZING, TYP
STOREFRONT AS SCHEDULED
SEALANT AND BACKER
ROD, TYP
Z-METAL PER
MANUFACTURER'S
RECOMMENDATION
TRIM FASTENER PER
MANUFACTURER
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
DOOR &
STOREFRONT
DETAILS
200102
A7.2
BC
JK
HB
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3" = 1'-0"A7.2
A1 STOREFRONT DOOR - HEAD
SCALE:3" = 1'-0"A7.2
B1 STOREFRONT DOOR - JAMB
SCALE:3" = 1'-0"A7.2
D2 STOREFRONT - SILL
SCALE:3" = 1'-0"A7.2
D3 STOREFRONT - HORIZONTAL MULLION
SCALE:3" = 1'-0"A7.2
D4 STOREFRONT - HORIZONTAL MULLION WITH CAP
SCALE:3" = 1'-0"A7.2
C1 STOREFRONT DOOR - JAMB AT COLUMN
SCALE:3" = 1'-0"A7.2
C4 STOREFRONT - AT BEAM
SCALE:3" = 1'-0"A7.2
C3 STOREFRONT - VERTICAL MULLION
SCALE:3" = 1'-0"A7.2
B2 STOREFRONT - JAMB AT MTL-3
SCALE:3" = 1'-0"A7.2
A4 STOREFRONT - JAMB AT COLUMN
SCALE:3" = 1'-0"A7.2
B4 STOREFRONT - JAMB AT OUTSIDE CORNER
SCALE:3" = 1'-0"A7.2
A2 STOREFRONT - HEAD AT MTL-3
SCALE:3" = 1'-0"A7.2
D1 STOREFRONT DOOR - THRESHOLD
SCALE:3" = 1'-0"A7.2
B3 STOREFRONT - JAMB AT MCM-1
SCALE:3" = 1'-0"A7.2
A3 STOREFRONT - HEAD AT MCM-1
SCALE:3" = 1'-0"A7.2
C2 STOREFRONT - SILL
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 260 of 357
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
WOOD HEADER, SEE STRUCTURAL
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE, TYP
SHIM AS REQUIRED, TYP
SEALANT BOTH SIDES
GLAZING, TYP
STOREFRONT AS SCHEDULED
STOREFRONT SYSTEM BEYOND, TYP
WALL BEYOND
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
WOOD HEADER, SEE STRUCTURAL
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE, TYP
SHIM AS REQUIRED, TYP
SEALANT BOTH SIDES
GLAZING, TYP
STOREFRONT AS SCHEDULED
STOREFRONT SYSTEM BEYOND, TYP
WALL BEYOND
PLYWOOD SHEATHING, SEE
STRUCTURAL
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
WOOD HEADER, SEE STRUCTURAL
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE, TYP
SHIM AS REQUIRED, TYP
SEALANT AND BACKER ROD, TYP
GLAZING
WINDOW AS SCHEDULED
WINDOW FRAME BEYOND, TYP
WALL BEYOND
WOOD BLOCKING
STOREFRONT SYSTEM BEYOND, TYP
GLAZING, TYP
STOREFRONT AS SCHEDULED
CONCRETE SLAB ON GRADE, SEE
STRUCTURAL. FINISH ASSCHEDULEDSEALANTANDBACKERROD, TYP
SHIM AS REQUIRED
STOREFRONT SYSTEM BEYOND, TYP
GLAZING, TYP
STOREFRONT AS
SCHEDULED
STOREFRONT SYSTEM BEYOND, TYP
GLAZING, TYP
STOREFRONT AS SCHEDULED
STOREFRONT SYSTEM BEYOND, TYP
GLAZING, TYP
STOREFRONT AS SCHEDULED
STOREFRONT SYSTEM BEYOND, TYP
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE, TYP
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
PLYWOOD SHEATHING, SEE
STRUCTURAL
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE, TYP
WALL BEYOND
STOREFRONT AS
SCHEDULED
STOREFRONT SYSTEM
BEYOND, TYP
GLAZING, TYP
SHIM AS REQUIRED, TYP
SEALANT BOTH SIDES
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE, TYP
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
WALL BEYOND
STOREFRONT AS
SCHEDULED
STOREFRONT SYSTEM
BEYOND, TYP
GLAZING, TYP
SHIM AS REQUIRED, TYP
SEALANT BOTH SIDES
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE, TYP
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE, TYP
STOREFRONT AS SCHEDULED
STOREFRONT SYSTEM BEYOND, TYP
GLAZING, TYP
WOOD BLOCKING
SEALANT BOTH SIDES
PLYWOOD SHEATHING, SEE
STRUCTURAL
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE, TYP
BATT INSULATION, SEE
BUILDING SECTIONS FOR
TYPE
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE, TYP
WOOD BLOCKING
WINDOW FRAME
BEYOND, TYP
GLAZING
WINDOW AS SCHEDULED
SEALANT AND BACKER
ROD, TYP
QUARTZ WINDOW SILL,
TYP
1/
2 1/
2 GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
QUARTZ WINDOW SILL, TYP
WINDOW AS SCHEDULED
GLAZING
SHIM AS REQUIRED, TYP
SEALANT AND BACKER
ROD, TYP
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
1/2"
1/2"
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
WINDOW FRAME BEYOND, TYP
34" A.F.F.
WALL BEYOND
SEALANT BOTH SIDES
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
METAL SIDING, SEE FINISH
SCHEDULE
DOOR AS SCHEDULED
SEALANT
WALL BEYOND
BUILDING PAPER
FLASHING TAPE PER
MANUFACTURER'S
RECOMMENDATION
PANEL CLIP PER
MANUFACTURER'S
RECOMMENDATION
CLOSURE PER
MANUFACTURER'S
RECOMMENDATION
PREFINISHED METAL
FLASHING
WATERPROOFING, SEE
D1/A7.1
PLYWOOD SHEATHING,
SEE STRUCTURAL
PLYWOOD SHEATHING,
SEE STRUCTURAL
BUILDING PAPER
METAL SIDING, SEE FINISH
SCHEDULE
ZEE FLASHING PER
MANUFACTURER'S
RECOMMENDATION WATERPROOFING, SEE
D1/A7.1
PREFINISHED METAL TRIM
DOOR AS SCHEDULED
SEALANT
WALL BEYOND
BUILT-UP ROOF, SEE FINISH
SCHEDULE
BUILT-UP ROOF, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
METAL SIDING, SEE FINISH
SCHEDULE
DOOR AS SCHEDULED
SEALANT
WALL BEYOND
BUILDING PAPER
FLASHING TAPE PER
MANUFACTURER'S
RECOMMENDATION
PANEL CLIP PER
MANUFACTURER'S
RECOMMENDATION
CLOSURE PER
MANUFACTURER'S
RECOMMENDATION
PREFINISHED METAL TRIM
WATERPROOFING, SEE
D1/A7.1
EXTERIOR
INTERIOR
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
SEALANT AND BACKER
ROD, TYP
WOOD BLOCKING
SHIM AS REQUIRED
STOREFRONT SYSTEM
BEYOND, TYP
STOREFRONT AS SCHEDULED
WATERPROOFING, SEE
D1/A7.1
BREAK METAL, COLOR TO
MATCH STOREFRONT
METAL SIDING, SEE FINISH
SCHEDULE
INTERIOR
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
STOREFRONT
AND WINDOW
DETAILS
200102
A7.3
BC
JK
GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3" = 1'-0"A7.3
A2 INTERIOR STOREFRONT - HEAD
SCALE:3" = 1'-0"A7.3
A3 INTERIOR STOREFRONT - HEAD
SCALE:3" = 1'-0"A7.3
A4 INTERIOR SLIDER PASS-THROUGH WINDOW - HEAD
SCALE:3" = 1'-0"A7.3
D2 INTERIOR STOREFRONT - SILL
SCALE:3" = 1'-0"A7.3
C2 INTERIOR STOREFRONT - JAMB AT CORNER
SCALE:3" = 1'-0"A7.3
C3 INTERIOR STOREFRONT - VERTICAL MULLION
SCALE:3" = 1'-0"A7.3
D4 INTERIOR STOREFRONT - HORIZONTAL MULLION
SCALE:3" = 1'-0"A7.3
B3 INTERIOR STOREFRONT - JAMB
SCALE:3" = 1'-0"A7.3
B2 INTERIOR STOREFRONT - JAMB
SCALE:3" = 1'-0"A7.3
D3 INTERIOR STOREFRONT - SILL
SCALE:3" = 1'-0"A7.3
B4 INTERIOR SLIDER PASS-THROUGH WINDOW - JAMB
SCALE:3" = 1'-0"A7.3
C4 INTERIOR SLIDER PASS-THROUGH WINDOW - SILL
SCALE:3" = 1'-0"A7.3
A1 ROOF ACCESS DOOR - HEAD
SCALE:3" = 1'-0"A7.3
B1 ROOF ACCESS DOOR - JAMB
SCALE:3" = 1'-0"A7.3
C1 ROOF ACCESS DOOR - SILL
SCALE:3" = 1'-0"A7.3
D1 STOREFRONT - JAMB AT MTL-3
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 261 of 357
PLYWOOD SHEATHING,
SEE STRUCTURAL
EXHAUST FAN, SEE MECHANICAL
8"
M
IN.
METAL FLASHING
MEMBRANE FLASHING
BASE FLASHING
BUR MEMBRANE, SEE FINISH
SCHEDULE
BASE SHEET
CANT STRIP
PLYWOOD SHEATHING,
SEE STRUCTURAL 4" MIN.
SEALANT
MEMBRANE FLASHING
BASE FLASHING
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
HEAT STACK
UMBRELLA
STORM COLLAR SET IN
MASTIC PLYWOOD SHEATHING,
SEE STRUCTURAL
SEALANT
MEMBRANE FLASHING
BASE FLASHING
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
PLUMBING VENT STACK,
SEE PLUMBING
LEAD FLASHING
4"
12"
M
IN.
PLYWOOD SHEATHING,
SEE STRUCTURAL
FLASHING SET IN MASTIC
MEMBRANE
STRAINER BASKET
CLAMPING RING
BASE FLASHING
BASE SHEET
BUR MEMBRANE,
SEE FINISH
SCHEDULE
NOTE: OVERFLOW DRAIN LINE SHALL BE INDEPENDENT
OF MAIN ROOF DRAIN AND TERMINATE TO DAYLIGHT
OVERFLOWDRAINROOFDRAIN
METAL STRAINER TYP.
MEMBRANE, METAL AND
FLASHING EXTENDED UNDER
CLAMPING RING TYP.
LINE OF ROOF STRUCTURE
8" MIN
1'-0"
A7.4
C3
METAL FLASHING
ACT/ACOUSTICAL
CLOUD
OPENING
22 1/ 2"
ROOF FRAMING AS
OCCURS, SEE
STRUCTURAL
GYPSUM BOARD
BUILDING PAPER
PLYWOOD SHEATHING,
SEE STRUCTURAL
FASTENER AND SEALANT
PER MANUFACTURER,
TYP.
BLOCKING AS REQUIRED
PREFINISHED PARAPET
FLASHING
BASE FLASHING
MEMBRANE FLASHING
METAL SIDING, SEE FINISH
SCHEDULE
CANT STRIP
PLYWOOD SHEATHING,
SEE STRUCTURAL
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
BASE FLASHING
MEMBRANE FLASHING
BUILDING PAPER
PLYWOOD SHEATHING,
SEE STRUCTURAL
FASTENER AND SEALANT
PER MANUFACTURER,
TYP.
BLOCKING AS REQUIRED
PREFINISHED PARAPET
FLASHING
METAL SIDING, SEE FINISH
SCHEDULE
CANT STRIP
PLYWOOD SHEATHING,
SEE STRUCTURAL
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
BASE FLASHING
MEMBRANE FLASHING
SEALANT
TERMINATION BAR
BASE FLASHING
MEMBRANE FLASHING
BUILDING PAPER
METAL SIDING, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
FLASHING TAPE PER
MANUFACTURER
CLOSURE PER
MANUFACTURER'S
RECOMMENDATION
PANEL CLIP PER
MANUFACTURER'S
RECOMMENDATION
DRIP FLASHING,
PREFINISHED TO MATCH
VERTICAL METAL SIDING
CLIP FASTENER PER
MANUFACTURER
MEMBRANE FLASHING
BASE FLASHING
CANT STRIP
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
METAL FLASHING
METAL FLASHING
BUR MEMBRANE, SEE
FINISH SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
BASE SHEET
SEALANT
OPENING
14 1/2"
ROOF FRAMING AS
OCCURS, SEE
STRUCTURAL
PLYWOOD SHEATHING,
SEE STRUCTURAL
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
BASE FLASHING
MEMBRANE FLASHING
METAL FLASHING
FLASHING RECEIVER PER
MANUFACTURER
GYPSUM BOARD
METAL FLASHING
METAL FLASHING
BUR MEMBRANE, SEE
FINISH SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
BASE SHEET
SEALANT
GYPSUM BOARD
CEILING WHERE
OCCURS
ROOF FRAMING AS
OCCURS, SEE
STRUCTURAL
OPENING
14 1/2"
BUILDING PAPER
PLYWOOD SHEATHING,
SEE STRUCTURAL
FASTENER AND SEALANT
PER MANUFACTURER,
TYP.
BLOCKING AS REQUIRED
PREFINISHED PARAPET
FLASHING
BASE FLASHING
MEMBRANE FLASHING
METAL SIDING, SEE FINISH
SCHEDULE
CANT STRIP
PLYWOOD SHEATHING,
SEE STRUCTURAL
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
BASE FLASHING
MEMBRANE FLASHING
BUILDING PAPER
PLYWOOD SHEATHING,
SEE STRUCTURAL
METAL SIDING, SEE FINISH
SCHEDULE
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ROOFING
DETAILS
200102
A7.4
BC
JK
GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3" = 1'-0"A7.4
D2 BUR - EXHAUST FAN
SCALE:3" = 1'-0"A7.4
D3 BUR - HEAT STACK
SCALE:3" = 1'-0"A7.4
D4 BUR - PLUMBING STACK
SCALE:3" = 1'-0"A7.4
C3 BUR - ROOF DRAIN
SCALE:1" = 1'-0"A7.4
C2 BUR - ROOF AND OVERFLOW DRAINS
SCALE:1" = 1'-0"A7.4
D1 TUBULAR SKYLIGHT - 21" DIAMETER
SCALE:3" = 1'-0"A7.4
A2 PARAPET CAP AT MTL-2
SCALE:3" = 1'-0"A7.4
A3 PARAPET AT MTL-3
SCALE:3" = 1'-0"A7.4
C4 BASE TERMINATION
SCALE:1" = 1'-0"A7.4
A1 TUBULAR SKYLIGHT - 14" DIAMETER OPEN TO STRUCTURE
SCALE:3" = 1'-0"A7.4
B3 BUR - CURB
SCALE:1" = 1'-0"A7.4
B1 TUBULAR SKYLIGHT - 14" DIAMETER
SCALE:3" = 1'-0"A7.4
A4 PARAPET CAP AT MTL-3
SCALE:3" = 1'-0"A7.4
B2 BASE DETAIL
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 262 of 357
EXTRUSIONS AND CLIPS PER
MANUFACTURER, TYP.
REVEAL PER
MANUFACTURER, TYP.
REVEAL PER
MANUFACTURER, TYP.
MEMBRANE FLASHING
BASE FLASHING
BUR MEMBRANE, SEE
FINISH SCHEDULE
BASE SHEET
METAL PANEL, SEE FINISH
SCHEDULE, TYP.
BUILDING PAPER
MEMBRANE FLASHING
BASE FLASHING
EXTRUSIONS AND CLIPS PER
MANUFACTURER, TYP.
REVEAL PER
MANUFACTURER, TYP.
BUILDING PAPER
MEMBRANE FLASHING
BASE FLASHING
REVEAL PER
MANUFACTURER, TYP.
BUR MEMBRANE, SEE
FINISH SCHEDULE
BASE SHEET
METAL PANEL, SEE FINISH
SCHEDULE, TYP.
CANT STRIP
PLYWOOD SHEATHING,
SEE STRUCTURAL
PLYWOOD SHEATHING,
SEE STRUCTURAL
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
GYPSUM BOARD, SEE
ROOM FINISH SCHEDULE
FOR TYPE
BUILDING PAPER
METAL SIDING, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
FLASHING TAPE PER
MANUFACTURER
SHIM PER
MANUFACTURER'S
RECOMMENDATION
Z-METAL PER
MANUFACTURER'S
RECOMMENDATION
TRIM FASTENER PER
MANUFACTURER
Z-METAL PER
MANUFACTURER'S
RECOMMENDATION
MEMBRANE FLASHING
BASE FLASHING
TERMINATION BAR
SEALANT
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
ROOF SCUPPER, C2/A7.5
MEMBRANE FLASHING
BASE FLASHING
MEMBRANE FLASHING
BASE FLASHING
TERMINATION BAR
SEALANT
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
MEMBRANE FLASHING
BASE FLASHING
BUILDING PAPER
METAL SIDING, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
FLASHING TAPE PER
MANUFACTURER
PREFINISHED METAL
FLASHING
WATERPROOFING, SEE
D1/A7.1
CLOSURE PER
MANUFACTURER'S
RECOMMENDATION
PANEL CLIP PER
MANUFACTURER'S
RECOMMENDATION
ROOF SCUPPER, C2/A7.5
MEMBRANE FLASHING
BASE FLASHING
BUR MEMBRANE, SEE
FINISH SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
PLYWOOD SHEATHING,
SEE STRUCTURAL
2X BRACE, SEE
STRUCTURAL
BASE SHEET
SEE 4/S4.3
BUILDING PAPER
METAL SIDING, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
FLASHING TAPE PER
MANUFACTURER
CLOSURE PER
MANUFACTURER'S
RECOMMENDATION
PANEL CLIP PER
MANUFACTURER'S
RECOMMENDATION
DRIP FLASHING,
PREFINISHED TO MATCH
VERTICAL METAL SIDING
CLIP FASTENER PER
MANUFACTURER
MEMBRANE FLASHING
BASE FLASHING
CANT STRIP
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
CANT STRIP
PLYWOOD SHEATHING,
SEE STRUCTURAL
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
BASE FLASHING
MEMBRANE FLASHING
PLYWOOD SHEATHING,
SEE STRUCTURAL
BASE FLASHING
MEMBRANE FLASHING
METAL FLASHING SET IN
MASTIC OVER BASE
FLASHING, FASTEN @ 2"
O.C.
METAL SIDING, SEE FINISH
SCHEDULE
FLASHING TAPE PER
MANUFACTURER
DRIP FLASHING,
PREFINISHED TO MATCH
VERTICAL METAL SIDING
MEMBRANE FLASHING
BASE FLASHING
CANT STRIP
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
BUILDING PAPER
PLYWOOD SHEATHING,
SEE STRUCTURAL
Z-METAL PER MANUFACTURER'S
RECOMMENDATION
HORSESHOE SHIM PER
MANUFACTURER
TRIM FASTENER PER MANUFACTURER
BASE SHEET
BUR MEMBRANE, SEE
FINISH SCHEDULE
BASE FLASHING
MEMBRANE FLASHING
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
ROOF DETAILS
200102
A7.5
BC
JK
GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3" = 1'-0"A7.5
B3 PARAPET AT MCM-1
SCALE:3" = 1'-0"A7.5
B1 PARAPET AT MCM-1
SCALE:3" = 1'-0"A7.5
C1 SCUPPER AT MTL-2
SCALE:3" = 1'-0"A7.5
C2 SCUPPER AT MTL-3
SCALE:3" = 1'-0"A7.5
D3 PARAPET BRACE AT MTL-3
SCALE:3" = 1'-0"A7.5
D2 PARAPET BRACE END
SCALE:3" = 1'-0"A7.5
D1 BASE TERMINATION AT MTL-3
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 263 of 357
CONCRETE CURB, SEE STRUCTURAL
SOLID SURFACE, SEE FINISH
SCHEDULE
SHOWER PAN
FINISH AS OCCURS, SEE INTERIOR
ELEVATIONS AND FINISH SCHEDULE
FINISH FLOOR, SEE ROOM FINISH
SCHEDULE
GYPSUM BOARD WHERE OCCURS,
SEE FINISH SCHEDULE FOR TYPE
WALL BASE WHERE OCCURS, SEE
ROOM FINISH SCHEDULE
6"
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
BATT INSULATION
DEPRESSED SLAB, SEE STRUCTURAL
WATERPROOF MEMBRANE
WALL BASE WHERE OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD WHERE OCCURS,
SEE FINISH SCHEDULE FOR TYPE
CONCRETE CURB, SEE STRUCTURAL
WALL BASE WHERE OCCURS, SEE
ROOM FINISH SCHEDULE
BATT INSULATION
FINISH FLOOR, SEE ROOM FINISH
SCHEDULE
FINISH AS OCCURS, SEE INTERIOR
ELEVATIONS AND FINISH SCHEDULE
FINISH FLOOR, SEE ROOM FINISH
SCHEDULE
GYPSUM BOARD WHERE OCCURS,
SEE FINISH SCHEDULE FOR TYPE
FINISH AS OCCURS, SEE INTERIOR
ELEVATIONS AND FINISH SCHEDULE
6"
PLYWOOD SHEATHING WHERE
OCCURS, SEE STRUCTURAL
BATT INSULATION
WALL BASE WHERE OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD WHERE OCCURS,
SEE FINISH SCHEDULE FOR TYPE
PLYWOOD SHEATHING, SEE
STRUCTURAL
BUILDING PAPER
FINISH FLOOR, SEE ROOM FINISH
SCHEDULE
FINISH GRADE, SEE CIVIL
AND LANDSCAPE
CONCRETE CURB, SEE STRUCTURAL
INTERIOR EXTERIOR
6"
VERTICAL METAL SIDING,
SEE FINISH SCHEDULE
FINISH AS OCCURS, SEE INTERIOR
ELEVATIONS AND FINISH SCHEDULE
M
IN.4"
FLASHING TAPE PER
MANUFACTURER
PANEL CLIP PER
MANUFACTURER
CLIP FASTENER PER
MANUFACTURER
CLOSURE PER
MANUFACTURER
DRIP FLASHING,
PREFINISHED TO MATCH
VERTICAL METAL SIDING
BATT INSULATION
WALL BASE WHERE
OCCURS, SEE ROOM
FINISH SCHEDULE
GYPSUM BOARD WHERE
OCCURS, SEE FINISH
SCHEDULE FOR TYPE
FINISH FLOOR, SEE ROOM
FINISH SCHEDULE
6"
FINISH AS OCCURS, SEE
INTERIOR ELEVATIONS
AND FINISH SCHEDULE
CONCRETE CURB, SEE
STRUCTURAL
GYPSUM BOARD WHERE
OCCURS, SEE FINISH
SCHEDULE FOR TYPE
FINISH AS OCCURS, SEE
INTERIOR ELEVATIONS
AND FINISH SCHEDULE
WALL BASE WHERE
OCCURS, SEE ROOM
FINISH SCHEDULE
CONCRETE CURB, SEE
STRUCTURAL
FINISH FLOOR, SEE
ROOM FINISH
SCHEDULE
BATT INSULATION
WALL BASE WHERE OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD WHERE OCCURS,
SEE FINISH SCHEDULE FOR TYPE
FINISH FLOOR, SEE ROOM FINISH
SCHEDULE
CONCRETE SLAB ON
GRADE, SEE CIVIL AND
LANDSCAPE
SEALANT AND BACKER
ROD, TYP
INTERIOR EXTERIOR
6"
FINISH AS OCCURS, SEE INTERIOR
ELEVATIONS AND FINISH SCHEDULE
DRIP FLASHING,
PREFINISHED TO MATCH
VERTICAL METAL SIDING
CLOSURE PER
MANUFACTURER
PANEL CLIP PER
MANUFACTURER
CLIP FASTENER PER
MANUFACTURER
FLASHING TAPE PER
MANUFACTURER
BUILDING PAPER
VERTICAL METAL SIDING,
SEE FINISH SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
M
IN.2"
CONCRETE CURB, SEE STRUCTURAL
BATT INSULATION
WALL BASE WHERE OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD WHERE OCCURS,
SEE FINISH SCHEDULE FOR TYPE
PLYWOOD SHEATHING, SEE
STRUCTURAL
BUILDING PAPER
FINISH FLOOR, SEE ROOM FINISH
SCHEDULE
FINISH GRADE, SEE CIVIL AND
LANDSCAPE
CONCRETE CURB, SEE STRUCTURAL
INTERIOR EXTERIOR
6"
HORIZONTAL METAL SIDING, SEE
FINISH SCHEDULE
FINISH AS OCCURS, SEE INTERIOR
ELEVATIONS AND FINISH SCHEDULE
CONCRETE CURB, SEE STRUCTURAL
FLASHING TAPE PER
MANUFACTURER
HORSESHOE SHIM PER
MANUFACTURER
Z-METAL PER MANUFACTURER'S
RECOMMENDATION
TRIM FASTENER PER MANUFACTURER
DRIP FLASHING, PREFINISHED TO
MATCH HORIZONTAL METAL SIDING
M
IN.4"
BATT INSULATION
WALL BASE WHERE OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD WHERE OCCURS,
SEE FINISH SCHEDULE FOR TYPE
FINISH FLOOR, SEE ROOM FINISH
SCHEDULE
CONCRETE SLAB ON GRADE, SEE
CIVIL AND LANDSCAPE
SEALANT AND BACKER ROD, TYP
INTERIOR EXTERIOR
6"
FINISH AS OCCURS, SEE INTERIOR
ELEVATIONS AND FINISH SCHEDULE
DRIP FLASHING, PREFINISHED TO
MATCH HORIZONTAL METAL SIDING
FLASHING TAPE PER
MANUFACTURER
BUILDING PAPER
HORIZONTAL METAL SIDING, SEE
FINISH SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
Z-METAL PER MANUFACTURER'S
RECOMMENDATION
HORSESHOE SHIM PER
MANUFACTURER
TRIM FASTENER PER MANUFACTURER
M
IN.2"
CONCRETE CURB, SEE STRUCTURAL
BATT INSULATION
WALL BASE WHERE OCCURS, SEE
ROOM FINISH SCHEDULE
GYPSUM BOARD WHERE OCCURS,
SEE FINISH SCHEDULE FOR TYPE
FINISH FLOOR, SEE ROOM FINISH
SCHEDULE
INTERIOR EXTERIOR
6"
FINISH AS OCCURS, SEE INTERIOR
ELEVATIONS AND FINISH SCHEDULE
BUILDING PAPER
PLYWOOD SHEATHING,
SEE STRUCTURAL
Z-METAL PER MANUFACTURER'S
RECOMMENDATION
HORSESHOE SHIM PER
MANUFACTURER
TRIM FASTENER PER MANUFACTURER
DRIP FLASHING, PREFINISHED TO
MATCH HORIZONTAL METAL SIDING
HORIZONTAL METAL SIDING, SEE
FINISH SCHEDULE
FLASHING TAPE PER
MANUFACTURER
FINISH GRADE, SEE CIVIL AND
LANDSCAPE
M
IN.4"
CONCRETE CURB, SEE STRUCTURAL
BATT INSULATION
WALL BASE WHERE
OCCURS, SEE ROOM
FINISH SCHEDULE
GYPSUM BOARD WHERE
OCCURS, SEE FINISH
SCHEDULE FOR TYPE
FINISH FLOOR, SEE ROOM
FINISH SCHEDULE
CONCRETE SLAB ON
GRADE, SEE CIVIL AND
LANDSCAPE
SEALANT AND BACKER
ROD, TYP
INTERIOR EXTERIOR
6"
FINISH AS OCCURS, SEE
INTERIOR ELEVATIONS
AND FINISH SCHEDULE
EXTRUSIONS AND CLIPS
PER MANUFACTURER
BUILDING PAPER
METAL PANEL
SYSTEM, SEE FINISH
SCHEDULE
PLYWOOD SHEATHING,
SEE STRUCTURAL
THERMAL
SEPARATOR PER
MANUFACTURER
CONCRETE CURB,
SEE STRUCTURAL
M
IN.2"
BUILDING PAPER
METAL PANEL
SYSTEM, SEE FINISH
SCHEDULE
PLYWOOD
SHEATHING, SEE
STRUCTURAL
THERMAL
SEPARATOR PER
MANUFACTURER
EXTRUSIONS AND
CLIPS PER
MANUFACTURER
FINISH GRADE, SEE
CIVIL AND
LANDSCAPE
PLYWOOD
SHEATHING, SEE
STRUCTURAL
METAL PANEL
SYSTEM, SEE FINISH
SCHEDULE
BUILDING PAPER
THERMAL
SEPARATOR PER
MANUFACTURER
EXTRUSIONS AND
CLIPS PER
MANUFACTURER
CONCRETE SLAB
ON GRADE, SEE
CIVIL AND
LANDSCAPE
SEALANT AND BACKER ROD, TYP
CONCRETE CURB,
SEE STRUCTURAL
4"
M
IN.2"
M
IN.
CONCRETE CURB, SEE STRUCTURAL
SOLID SURFACE, SEE FINISH
SCHEDULE
SHOWER PAN
GYPSUM BOARD WHERE
OCCURS, SEE FINISH
SCHEDULE FORTYPEGYPSUMBOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
BATT INSULATION
DEPRESSED SLAB, SEE STRUCTURAL
WATERPROOF MEMBRANE
FINISH GRADE, SEE CIVIL AND
LANDSCAPE
DRIP FLASHING,
PREFINISHED TO MATCH
HORIZONTAL METAL
SIDING
TRIM FASTENER PER
MANUFACTURER
HORSESHOE SHIM PER
MANUFACTURER
Z-METAL PER MANUFACTURER'S
RECOMMENDATION
FLASHING TAPE PER
MANUFACTURER
HORIZONTAL METAL SIDING, SEE
FINISH SCHEDULE
BUILDING PAPER
INTERIOR EXTERIOR
M
IN.4"
PLYWOOD SHEATHING, SEE
STRUCTURAL
BUILDING PAPER
FINISH GRADE, SEE CIVIL AND
LANDSCAPE
CONCRETE CURB, SEE STRUCTURAL
INTERIOR EXTERIOR
6"
HORIZONTAL METAL SIDING, SEE
FINISH SCHEDULE
CONCRETE CURB, SEE STRUCTURAL
DRIP FLASHING, PREFINISHED TO
MATCH HORIZONTAL METAL SIDING
DEPRESSED SLAB, SEE STRUCTURAL
SHOWER PAN
WATERPROOF MEMBRANE
SOLID SURFACE, SEE FINISH
SCHEDULE
GYPSUM BOARD, SEE ROOM FINISH
SCHEDULE FOR TYPE
BATT INSULATION
M
IN.4"
TRIM FASTENER PER
MANUFACTURER
HORSESHOE SHIM PER
MANUFACTURER
Z-METAL PER
MANUFACTURER'S
RECOMMENDATION
FLASHING TAPE PER
MANUFACTURER
BUILDING PAPER
METAL PANEL
SYSTEM, SEE FINISH
SCHEDULE
PLYWOOD
SHEATHING, SEE
STRUCTURAL
THERMAL
SEPARATOR PER
MANUFACTURER
EXTRUSIONS AND
CLIPS PER
MANUFACTURER
PLYWOOD
SHEATHING, SEE
STRUCTURAL
METAL PANEL
SYSTEM, SEE FINISH
SCHEDULE
BUILDING PAPER
THERMAL
SEPARATOR PER
MANUFACTURER
EXTRUSIONS AND
CLIPS PER
MANUFACTURER
CONCRETE SLAB
ON GRADE, SEE
CIVIL AND
LANDSCAPE
SEALANT AND BACKER ROD, TYP SEALANT AND
BACKER ROD, TYP
CONCRETE SLAB
ON GRADE, SEE
CIVIL AND
LANDSCAPE
CONCRETE CURB,
SEE STRUCTURAL
2"
M
IN.
2"
M
IN.
BUILDING PAPER
METAL PANEL
SYSTEM, SEE FINISH
SCHEDULE
PLYWOOD
SHEATHING, SEE
STRUCTURAL
THERMAL
SEPARATOR PER
MANUFACTURER
EXTRUSIONS AND
CLIPS PER
MANUFACTURER
PLYWOOD
SHEATHING, SEE
STRUCTURAL
METAL PANEL
SYSTEM, SEE FINISH
SCHEDULE
BUILDING PAPER
THERMAL
SEPARATOR PER
MANUFACTURER
EXTRUSIONS AND
CLIPS PER
MANUFACTURER
CONCRETE CURB,
SEE STRUCTURAL
FINISH GRADE, SEE
CIVIL AND
LANDSCAPE
FINISH GRADE, SEE
CIVIL AND
LANDSCAPE
4"
M
IN.
4"
M
IN.
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
CURB DETAILS
200102
A7.6
BC
JK
MM
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3" = 1'-0"A7.6
C2 CURB AT SHOWER PAN
SCALE:3" = 1'-0"A7.6
D2 CURB AT INTERIOR
SCALE:3" = 1'-0"A7.6
A2 CURB AT VERTICAL METAL SIDING - FINISH GRADE
SCALE:3" = 1'-0"A7.6
D1 DOUBLE CURB AT INTERIOR
SCALE:3" = 1'-0"A7.6
A1 CURB AT VERTICAL METAL SIDING - CONCRETE
SCALE:3" = 1'-0"A7.6
D3 DOUBLE CURB AT HORIZONTAL METAL SIDING - FINISH GRADE SCALE:3" = 1'-0"A7.6
A3 CURB AT HORIZONTAL METAL SIDING - CONCRETE
SCALE:3" = 1'-0"A7.6
A4 CURB AT HORIZONTAL METAL SIDING - FINISH GRADE
SCALE:3" = 1'-0"A7.6
B1 CURB AT METAL PANEL - CONCRETE
SCALE:3" = 1'-0"A7.6
B2 CURB AT METAL PANEL - CONCRETE & FINISH GRADE
SCALE:3" = 1'-0"A7.6
C1 CURB AT HORIZONTAL METAL SIDING & SHOWER PAN - FINISH GRADE SCALE:3" = 1'-0"A7.6
C3 DOUBLE CURB AT HORIZONTAL METAL SIDING & SHOWER PAN -FINISH GRADE SCALE:3" = 1'-0"A7.6
B3 CURB AT METAL PANEL - CONCRETE
SCALE:3" = 1'-0"A7.6
B4 CURB AT METAL PANEL - FINISH GRADE
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 264 of 357
EXTERIOR
INTERIOR
SECTION VIEW
PLYWOOD SHEATHING,
SEE STRUCTURAL
CLOSURE PER
MANUFACTURER, TYP.
PREFINISHED CORNER TRIM TO
MATCH METAL SIDING
METAL SIDING, SEE FINISH
SCHEDULE, TYP.
PANEL CLIP PER MANUFACTURER,
TYP.
FASTENER PER MANUFACTURER, TYP.
BUILDING PAPER,
EXTEND AT LEAST
ONE LAYER OF
BUILDING PAPER
FROM EACH
DIRECTION
AROUND CORNER
12" MIN.
EXTERIOR INTERIOR
SECTION VIEW
PREFINISHED CORNER TRIM TO
MATCH METAL SIDING
METAL SIDING, SEE FINISH
SCHEDULE, TYP.
PANEL CLIP PER MANUFACTURER,
TYP.
FASTENER PER MANUFACTURER, TYP.
Z-METAL PER MANUFACTURER
METAL SOFFIT, SEE FINISH SCHEDULE
BUILDING PAPER,
EXTEND AT LEAST
ONE LAYER OF
BUILDING PAPER
FROM EACH
DIRECTION
AROUND CORNER
12" MIN.
2 3/ 4"
EXTERIOR INTERIOR
PLAN VIEW
PLYWOOD SHEATHING, SEE
STRUCTURAL
METAL SIDING, SEE FINISH
SCHEDULE, TYP.
SEALANT PER
MANUFACTURER, TYP.
PREFINISHED CORNER TRIM TO
MATCH METAL SIDING
STARTER CLEAT PER
MANUFACTURER, TYP.
Z-METAL PER
MANUFACTURER
FASTENER PER
MANUFACTURER,
TYP.
BUILDING PAPER,
EXTEND AT LEAST
ONE LAYER OF
BUILDING PAPER
FROM EACH
DIRECTION
AROUND CORNER
12" MIN.
EXTERIOR INTERIOR
PLAN VIEW
PLYWOOD SHEATHING, SEE
STRUCTURAL
METAL SIDING, SEE FINISH
SCHEDULE, TYP.
SEALANT PER
MANUFACTURER, TYP.
PREFINISHED CORNER TRIM TO
MATCH METAL SIDING Z-METAL PER
MANUFACTURER
FASTENER PER
MANUFACTURER,
TYP.
CLOSURE PER MANUFACTURER, TYP.
PANEL CLIP PER MANUFACTURER,
TYP.
BUILDING PAPER,
EXTEND AT LEAST
ONE LAYER OF
BUILDING PAPER
FROM EACH
DIRECTION
AROUND CORNER
12" MIN.
INTERIOR EXTERIOR
PLAN VIEW
PLYWOOD SHEATHING, SEE
STRUCTURAL
METAL SIDING, SEE FINISH
SCHEDULE, TYP.
SEALANT PER
MANUFACTURER, TYP.
PREFINISHED CORNER TRIM TO
MATCH METAL SIDING
STARTER CLEAT PER
MANUFACTURER, TYP.
FASTENER PER
MANUFACTURER,
TYP.
PANEL CLIP PER
MANUFACTURER,
TYP.
BUILDING PAPER, EXTEND
AT LEAST ONE LAYER OF
BUILDING PAPER FROM
EACH DIRECTION
AROUND CORNER 12"
MIN.
INTERIOR EXTERIOR
PLAN VIEW
PLYWOOD SHEATHING, SEE
STRUCTURAL
METAL SIDING, SEE FINISH
SCHEDULE, TYP.
PREFINISHED CORNER TRIM TO
MATCH METAL SIDING
FASTENER PER
MANUFACTURER,
TYP.
CLOSURE PER
MANUFACTURER,
TYP.
BUILDING PAPER, EXTEND
AT LEAST ONE LAYER OF
BUILDING PAPER FROM
EACH DIRECTION
AROUND CORNER 12"
MIN.
PLYWOOD SHEATHING, SEE
STRUCTURAL
PREFINISHED METAL FLASHING
SEALANT PER
MANUFACTURER,
TYP.
SEALANT PER
MANUFACTURER,
TYP.
PENETRATION
FASTENER PER
MANUFACTURER,
TYP.
CLOSURE PER
MANUFACTURER,
TYP.
EXTERIOR INTERIOR
SECTION VIEW
EXTERIOR
SECTION VIEW
PLYWOOD SHEATHING, SEE
STRUCTURAL
METAL PANEL, SEE FINISH
SCHEDULE, TYP.
WEEP AND BAFFLE PER
MANUFACTURER
BUILDING PAPER, EXTEND
AT LEAST ONE LAYER OF
BUILDING PAPER FROM
EACH DIRECTION
AROUND CORNER 12"
MIN.
EXTERIOR
PLAN VIEW
PLYWOOD SHEATHING, SEE
STRUCTURAL
METAL PANEL, SEE FINISH
SCHEDULE, TYP.
BUILDING PAPER, EXTEND
AT LEAST ONE LAYER OF
BUILDING PAPER FROM
EACH DIRECTION
AROUND CORNER 12"
MIN.
INTERIOR
EXTERIOR INTERIOR
PLAN VIEW
PLYWOOD
SHEATHING, SEE
STRUCTURAL
FASTENER PER
MANUFACTURER,
TYP.
CLOSURE PER
MANUFACTURER, TYP.
PANEL CLIP PER
MANUFACTURER, TYP.
METAL PANEL, SEE FINISH SCHEDULE,
TYP.
EXTRUSIONS AND
CLIPS PER
MANUFACTURER,
TYP.
FASTENER AND SEALANT PER
MANUFACTURER, TYP.
PREFINISHED TRIM TO MATCH METAL
SIDING
SEALANT AND BACKER ROD PER
MANUFACTURER, TYP.
BUILDING PAPER,
EXTEND AT LEAST
ONE LAYER OF
BUILDING PAPER
FROM EACH
DIRECTION
AROUND CORNER
12" MIN.
EXTERIOR INTERIOR
PLAN VIEW
PLYWOOD SHEATHING,
SEE STRUCTURAL
METAL PANEL, SEE FINISH SCHEDULE,
TYP.
EXTRUSIONS AND CLIPS PER
MANUFACTURER, TYP.
SEALANT AND BACKER ROD PER
MANUFACTURER, TYP.
PREFINISHED TRIM TO
MATCH METAL SIDING
FASTENER AND SEALANT PER
MANUFACTURER, TYP.
BUILDING PAPER,
EXTEND AT LEAST
ONE LAYER OF
BUILDING PAPER
FROM EACH
DIRECTION
AROUND CORNER
12" MIN.
EXTERIOR
INTERIOR
PLAN VIEW
EXTRUSIONS AND CLIPS PER
MANUFACTURER, TYP.
METAL PANEL, SEE FINISH SCHEDULE,
TYP.
REVEAL PER MANUFACTURER, TYP.
PLYWOOD SHEATHING, SEE
STRUCTURAL
BUILDING PAPER
INTERIOR EXTERIOR
SECTION VIEW
PLYWOOD SHEATHING, SEE
STRUCTURAL
METAL PANEL, SEE
FINISH SCHEDULE,
TYP.
EXTRUSIONS AND CLIPS PER
MANUFACTURER, TYP.
WEEP AND BAFFLE PER
MANUFACTURER
REVEAL PER
MANUFACTURER, TYP.
BUILDING PAPER
3 45/64"
PLYWOOD SHEATHING,
SEE STRUCTURAL
SEALANT PER
MANUFACTURER, TYP.
PENETRATION
FASTENER PER
MANUFACTURER, TYP.
CLOSURE PER
MANUFACTURER, TYP.
EXTERIOR INTERIOR
SECTION VIEW
EXTERIOR
INTERIOR
SECTION VIEW
PLYWOOD SHEATHING,
SEE STRUCTURAL
EXTRUSIONS AND CLIPS
PER MANUFACTURER,
TYP.
SEALANT
METAL SIDING, SEE FINISH
SCHEDULE, TYP.
PANEL CLIP PER MANUFACTURER,
TYP.
FASTENER PER MANUFACTURER, TYP.
BUILDING PAPER,
EXTEND AT LEAST
ONE LAYER OF
BUILDING PAPER
FROM EACH
DIRECTION
AROUND CORNER
12" MIN.
SECTION VIEW
PLYWOOD SHEATHING, SEE
STRUCTURAL
METAL PANEL, SEE FINISH
SCHEDULE, TYP.
BUILDING PAPER, EXTEND
AT LEAST ONE LAYER OF
BUILDING PAPER FROM
EACH DIRECTION
AROUND CORNER 12"
MIN.
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
DETAILS
200102
A7.7
BC
JK
KG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3" = 1'-0"A7.7
A3 MTL-2 SOFFIT AT MTL-3
SCALE:3" = 1'-0"A7.7
A4 MTL-2 SOFFIT AT MTL-3
SCALE:3" = 1'-0"A7.7
C4 MTL-3 INSIDE CORNER
SCALE:3" = 1'-0"A7.7
C3 MTL-2/MTL-3 INSIDE CORNER
SCALE:3" = 1'-0"A7.7
B4 MTL-3 OUTSIDE CORNER
SCALE:3" = 1'-0"A7.7
B3 MTL-2 OUTSIDE CORNER
SCALE:3" = 1'-0"A7.7
D4 PENETRATION AT MTL-3
SCALE:3" = 1'-0"A7.7
B1 MCM-1 EYEBROW
SCALE:3" = 1'-0"A7.7
B2 MCM-1 OUTSIDE CORNER
SCALE:3" = 1'-0"A7.7
C1 MCM-1/MTL-2 INSIDE CORNER
SCALE:3" = 1'-0"A7.7
C2 MCM-1/MTL-3 INSIDE CORNER
SCALE:3" = 1'-0"A7.7
D1 MCM-1 VERTICAL JOINT
SCALE:3" = 1'-0"A7.7
D2 MCM-1 HORIZONTAL JOINT
SCALE:3" = 1'-0"A7.7
D3 PENETRATION AT MTL-2
SCALE:3" = 1'-0"A7.7
A2 MTL-1 SOFFIT AT MTL-3
SCALE:3" = 1'-0"A7.7
A1 MCM-1 SOFFIT
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 265 of 357
FIRE SUPPRESSION OR FIRE
DETECTION DEVICE
LIGHT FIXTURE, PER
ELECTRICAL DWGS. REFER TO
ARCHITECTURAL RCP FOR
LAYOUT
EQ
EQ
EQ
EQ
EQ EQ
NOTE:
ALL CEILING DEVICES TO BE
CENTERED ON CEILING TILES U.N.O.
ON ARCHITECTURAL REFLECTED
CEILING PLAN.
CROSS RUNNERS, TYP.
HANGER WIRE, AS INDICATED
BELOW WITH MIN. 3 TIGHT TURNS
WITHIN THE FIRST 1-1/ 2" AT BOTH
ENDS OF WIRE, TYPICAL. ANCHOR
TO STRUCTURE PER DETAIL B2/A7.5
SEE FINISH SCHEDULE & SPECS FOR
TYPE OF CEILING TILE, TYPICAL
RIGID BRACING & COMPRESSION
STRUT. SEE DETAIL
MAIN RUNNERS, TYP.
CROSS RUNNER
MAIN RUNNER
ITEM
GALV. HANGER
WIRES (EA. WAY)
ACOUSTICAL PANEL CLG.
HEAVY DUTY" PER ASTM C635
12 GA. @ 4'-0" O.C.
RIGID BRACING
COMP. STRUT
PER @ 12'-0" O.C.
EA. WAY
HEAVY DUTY" PER ASTM C635
SECTION PROPERTIES FOR COLD ROLLED CHANNELS (CRC)
AND HAT CHANNELS SHALL BE IN COMPLIANCE WITH SSMA
ICC ER-4943P)
7/ 8"
8"
MAX.
3/ 4"
UNATTACHED WALL""ATTACHED WALL "
7/ 8"
BASIS-OF-DESIGN: PRODUCT/SYSTEM
IS COMPLIANT WITH ICC-ESR-1308
FOR SEISMIC DESIGN CATEGORY "D."HEAVY-DUTY RUNNERS, TYP.
PERIMETER WALL
MOLDING, TYP
MANUFACTURER'S
PROPRIETARY
ATTACHMENT
BERC-2" CLIP,
TYP.
MANUFACTURER'S
PROPRIETARY
ATTACHMENT
BERC-2" CLIP, TYP.
8"
MAX.
SUSPENSION
SYSTEM
1 3/
4"
HEAVY-DUTY
TEGULAR
RUNNERS, TYP. 9/16"
EDGE DETAIL
1 1
2 HANGER WIRE (TYP.)
MAIN OR CROSS RUNNER
MIN. 4 TIGHT TURNS
LAY-IN CLG. PANEL TYP.
CLOSURE ANGLE.
REFER TO NOTE 1.
NOTE 1. ONE END OF CEILING GRID SHALL BE POP RIVETED TO THE CLOSURE ANGLE. THE
OTHER END IN EACH HORIZONTAL DIRECTION SHALL BE ATTACHED BY SLOTTED CLIP, ESR-1308. AS SHOWN ABOVE DETAIL AND SEE LOCATION DI AGRAM 7/ 8"
CEILING GRID PLAN @ EDGE
TRACK CONNECTION TO WALL
POP RIVETS
PLAN VIEW
2" BEAM END
RETAINING
CLIP JOINS
BERC2), PER
ESR-1308
CAT 4
8" MAX.
12 GA. WIRE TYP
COMPRESSION STRUT TABLE
1 - 3 5/ 8" x 25 GA. MTL. STUD
2 - 1 5/ 8" x 25 GA. MTL STUDS W/ SHEET MTL. SCREWS @ 12" O.C. 2 - 2 1/ 2" x 25 GA. MTL. STUDS W/ SHEET MTL. SCREWS @ 12" O.C. 2 - 3 5/ 8" x 25 GA. MTL STUDS W/ SHEET MTL. SCREWS @ 12" O.C.
DESCRIPTION
PROVIDE VERTICAL
WIRE HANGERS @
4'-0" O.C. EA. WAY
TYP.)
VERTICAL METAL STUD COMPRESSION
STRUT @ 12'-0" EA. WAY MAX. SECURE TO
CEILING SYSTEM W/SHEET METAL SCREWS.
SEE BRACING DETAIL & TABLE BELOW.
A
LENGTH OF STRUT
0" TO 8'-0"
8'-1" TO 10'-0"
10'-1" TO 15'-0"
15'-1" TO 20'-0"
TYPE
A
B
B
B
METAL STUD
SHEET MTL. SCREW
SCHEDULED
CEILING SYSTEM
B
WALL
SECURE TO STRUCTURE W/
POWER DRIVEN FASTENERS
1. SUSPENDED CEILINGS SHALL COMPLY WITH ASCE 7 13.5.6.2.2
2. PERIMETER SUPPORT ON MINIMUM 2" CLOSURE ANGLES, 2 ADJACENT ENDS OF CEILING GRID SHALL BE ATTACHED TO CLOSURE ANGLES WHILE OTHER ENDS SHALL HAVE 3/4" CLEARANCE FROM WALLS AND REST UPON AND BE FREE TO SLIDE ON CLOSURE ANGLES. 8"
4'-0" MAX.
STRUT W/DIAGONAL WIRE BRACING
12'-0"O.C. EA. DIRECTION MAX. FOR
13'
M
AX.
VARIES
AFF
TYP
45°
NOTES:
MECHANICAL AND LIGHT FIXTURES SHALL BE CONNECTED TO (1) VERTICAL 12 GA. WIRE ATTACHED TO OPPOSING CORNERS ALONG FIXTURES DIAGONAL.
12 GA. SPLAYED BRACING WIRES AT 12 FEET
O.C. MAX WITHIN 6 FEET FROM EACH WALL
AND SHALL BE 6' MIN. FROM PIPES AND
DUCTWORK
18 GA WIRE TIE
CROSS-FURRING
7/8" GALV. HAT SECTION
FURRING CHANNEL AT
16" O.C. MAX. 25 GA. AT
INTERIOR, 20 GA. AT EXTERIOR
APPLICATIONS
COMPRESSION STRUT 25 GA.
METAL STUD WITH 7/8" FLANGE
12'-0" O.C. EACH WALL
MAIN RUNNER:
1-1/2" DEEP, 7/16" FLANGE X A75 LB./FT.
MIN. COLD ROLLED CHANNEL AT 48"
O.C. MAX. WITH 8 GA. VERT. HANGER
WIRE AT 48" O.C. WITH 3 TURNS IN
1'1/ 2"
NOTE: PERIMETER WIRES
TO BE 8" FROM WALL
2"
MAX.
2"
MAX.
C
90° MIN
45°
MAX.
45°
MAX.
L
45°
MAX.
90° MIN.
LATERAL FORCE BRACING MEMBERS SHALL BE A MINIMUM OF 6" FROM ALL HORIZONTAL PIPING OR DUCT
WORK NOT PROVIDED WITH BRACING RESTRAINTS FOR HORIZONTAL FORCES FOR STRUTS 4' TO 8' IN LENGTH, A MINIMUM 25 GA. METAL STUD WITH 1-5/ 8" FLANGE AND 1/ 2" LIP MAY BE USED.
PROVIDE CALS FOR STRUTS GREATER THAN 8' IN LENGTH
FACE OF FINISH
WALL
ACT, SEE FINISH
SCHEDULE
STOREFRONT AS
SCHEDULED
1"
ACT WHERE OCCURS GYPSUM BOARD CEILING WHERE
OCCURS
WOOD FRAMING, SEE STRUCTURAL
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
BATT INSULATION, SEE BUILDING
SECTIONS FOR TYPE
LOCKING CHANNEL
SECTION VIEW
6"
ACT WHERE OCCURS
FRAMING AS OCCURS, SEE
STRUCTURAL
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
8'-0"
ACT WHERE OCCURS
GYPSUM BOARD, SEE FINISH
SCHEDULE FOR TYPE
ROOF FRAMING, SEE
STRUCTURAL
GYPSUMBOARDGYPSUMBOARD
TRIM
HANGER WIRE
LAY-IN CLG. PANEL TYP.
EXTERIOR
INTERIOR
SECTION VIEW
Z-METAL PER
MANUFACTURER
METAL PANEL, SEE FINISH
SCHEDULE, TYP.
EXTRUSIONS AND CLIPS PER
MANUFACTURER, TYP.
BUILDING PAPER, EXTEND
AT LEAST ONE LAYER OF
BUILDING PAPER FROM
EACH DIRECTION
AROUND CORNER 12"
MIN.
PREFINISHED METAL
FLASHING TO MATCH
METAL PANEL
SEALANT AND BACKER
ROD
HORSESHOE SHIM PER
MANUFACTURER
TRIM FASTENER PER
MANUFACTURER
METAL PANEL, SEE FINISH
SCHEDULE, TYP.
EXTERIOR
INTERIOR
SECTION VIEW
METAL PANEL, SEE FINISH
SCHEDULE, TYP.
EXTRUSIONS AND CLIPS PER
MANUFACTURER, TYP.
BUILDING PAPER, EXTEND
AT LEAST ONE LAYER OF
BUILDING PAPER FROM
EACH DIRECTION
AROUND CORNER 12"
MIN.
PREFINISHED METAL
FLASHING TO MATCH
METAL PANEL
SEALANT AND BACKER
ROD
METAL SIDING, SEE FINISH
SCHEDULE, TYP.
FLASHING TAPE PER
MANUFACTURER
PANEL CLIP PER
MANUFACTURER
CLIP FASTENER PER
MANUFACTURER
CLOSURE PER
MANUFACTURER
ECKEFRAI
REN. 09/10/21
FEAT
ST
LFCAOI
L FEJ
C018223
OAINR
ATZ T
SNEC Y
DE CARTHI
Description: Date:
Project Number:
Drawn By:
Checked By:
Sheet Title:
Approved By:
ISSUED FOR
CONSTRUCTION
BLDG DEPT
SUBMITTAL
09/ 02/20
BLDG DEPT
RESUBMITTAL
BID SET
11/ 25/20
02/ 11/21
PROJECT:
6353 DEL CERRO BLVD., SAN DIEGO, CA 92120
619.698.9177 | www.jeffkatzarchitecture.com
DETAILS
200102
A7.8
BC
JK
GG
ADMINISTRATION
BUILDING
CITY OF VISTA PUBLIC
WORKS DEPARTMENT
1165 E TAYLOR ST.
VISTA, CA 92084
SCALE:3/ 4" = 1'-0"A7.8
B2 TYPICAL ACOUSTICAL PANEL CEILING
SCALE:12" = 1'-0"A7.8
B3 CEILING SUSPENSION DETAIL
SCALE:3" = 1'-0"A7.8
A2 CEILING SUSPENSION SYSTEM & EDGE
SCALE:6" = 1'-0"A7.8
B4 EDGE DETAIL
SCALE:1/ 2" = 1'-0"A7.8
B1 SUSPENDED CEILING DETAIL
SCALE:3" = 1'-0"A7.8
A4 SUSPENDED CEILING DETAIL
SCALE:3" = 1'-0"A7.8
C4 ACT AT STOREFRONT
SCALE:3" = 1'-0"A7.8
D4 TYPICAL GYPSUM BOARD WRAPPED WALL
SCALE:3" = 1'-0"A7.8
D3 SOFFIT
SCALE:3" = 1'-0"A7.8
C3 TYPICAL PLENUM
SCALE:3" = 1'-0"A7.8
C2 ACOUSTICAL CLOUD EDGE DETAIL
SCALE:3" = 1'-0"A7.8
D1 MCM-1/MTL-2 BASE
SCALE:3" = 1'-0"A7.8
D2 MCM-1/MTL-3 BASE
FOR
CONSTRUCTION
05/ 18/21
11/10/2026 C6 266 of 357
VARIES,
SEE
INTERIO
R
ELEVATIO
NS
1'-3"
3"
2"
ADJUSTABLE SHELF CLIPS AND
STANDARDS
3/ 4" THICK PLYWOOD ADJUSTABLE
SHELF WITH WHITE MELAMINE FINISH,
TYP.
WHITE MELAMINE FINISH, TYP.
PULLS, ALL PULLS SHALL ALIGN, TYP.
PLASTIC LAMINATE LIGHT VALANCE
LIGHT FIXTURE WHERE OCCURS, SEE
ELECTRICAL
3/ 4" THICK PLYWOOD WITH PLASTIC
LAMINATE, SEE FINISH SCHEDULE
MIRROR FRAME
MIRROR
FACE OF WALL
SEALANT
1 1/
2"
WALL MOUNTED MIRROR
COUNTERTOP, SEE FINISH SCHEDULE
CHAMFERED EDGE
APRON, SEE FINISH SCHEDULE
CONCEALED BRACKET AT OPEN
END AND 30" O.C. MAX
2" X 3" @ 16" O.C.
UNDERMOUNT SINK, SEE PLUMBING
AND T-4
FOUR (4) 1/ 2" - MACHINED BOLTS
PER STUD
KNEE AND TOE CLEARANCES PER
2019 CBC 11B-306.2 & 11B-306.3
9"
M
IN.
MAX.
6"
29"
M
IN.
BACKSPLASH
2'-
10"
1"
27"
M
IN.
2'-
10"
4"
3"
2'-1"
1"
1 1/
2"
PLASTIC LAMINATE BASE
CHAMFERED EDGE
ADJUSTABLE SHELF CLIPS AND
STANDARDS
3/ 4" THICK PLYWOOD ADJUSTABLE
SHELF WITH WHITE MELAMINE FINISH,
TYP.
3/ 4" THICK PLYWOOD WITH PLASTIC
LAMINATE, SEE FINISH SCHEDULE
WHITE MELAMINE FINISH, TYP.
DRAWERS WITH FULL EXTENSION
SLIDES
PULLS, ALL PULLS SHALL ALIGN, TYP.
COUNTERTOP, SEE FINISH SCHEDULE
BACKSPLASH WHERE OCCURS, SEE
FINSH SCHEDULE AND INTERIOR
ELEVATIONS
5"
1 1/
2"
2'-1"
MAX
6"
9"
M
IN.
29"
M
IN.
COUNTERTOP, SEE FINISH SCHEDULE
KNEE AND TOE CLEARANCES PER
2019 CBC 11B-306.2 & 11B-306.3
FOUR (4) 1/ 2" - MACHINED BOLTS
PER STUD
24"H X 21"W X 1 1/ 2" X 1/ 4" STEEL
ANGLE IRON AT ENDS AND 30" O.C.
WELD TO 18" X 2" X 1/8" BAR -
FASTEN WITH 3/ 4" FLAT HEAD WOOD
SCREW TO COUNTERTOP
PLYWOOD-SUB-SURFACE
CHAMFERED EDGE
2'-
10"
4"
2'-
10"
4"
3"
5"
2'-1"
6" MAX.
9"
M
IN.
17" MIN.
8" MIN.
27"
M
IN.
1 1/
2"
1"
BACKSPLASH WHERE OCCURS, SEE
FINSH SCHEDULE AND INTERIOR
ELEVATIONS
COUNTERTOP, SEE FINISH SCHEDULE
CHAMFERED EDGE
WHITE MELAMINE FINISH, TYP.
PULLS, ALL PULLS SHALL ALIGN, TYP.
3/ 4" THICK PLYWOOD WITH PLASTIC
LAMINATE DOOR WITH ATTACHED
PLASTIC LAMINATE BASE
3/ 4" THICK PLYWOOD WITH PLASTIC
LAMINATE TIP DRAWER, SEE FINISH
SCHEDULE
SINK, SEE PLUMBING
AND T-4
PLASTIC LAMINATE BASE
4"
3"
5"
2'-1"
1"
1 1/
2"
PLASTIC LAMINATE BASE
CHAMFERED EDGE
ADJUSTABLE SHELF CLIPS AND
STANDARDS
3/ 4" THICK PLYWOOD WITH PLASTIC
LAMINATE, SEE FINISH SCHEDULE
3/ 4" THICK PLYWOOD ADJUSTABLE
SHELF WITH WHITE MELAMINE FINISH,
TYP.
WHITE MELAMINE FINISH, TYP.
DRAWERS WITH FULL EXTENSION
SLIDES
PULLS, ALL PULLS SHALL ALIGN, TYP.
COUNTERTOP, SEE FINISH SCHEDULE
2'-
6"
3"
ADJUSTABLE SHELF CLIPS AND